WorldWideScience

Sample records for infantry brigade installation

  1. Unintended Relevance: The Role of the Stryker Brigade Combat Team in the Decisive Action Environment

    Science.gov (United States)

    2017-05-25

    its_time_to_create_a_megacities_combat_unit_110717.html. 47 Steve Krippel and Chris Ricci, “The Stryker Brigade Combat Team: America’s Early Entry Force,” Infantry, July...vehicles to transport the large amounts of equipment to do their job , which is to fight dismounted in complex terrain. Light infantry is necessary...2015_National_Military_Strategy.pdf. Krippel, Steve , and Chris Ricci. “The Stryker Brigade Combat Team: America’s Early Entry Force.” Infantry, July-September 2014

  2. Evaluation of the Performance of Females as Light Infantry Soldiers

    Directory of Open Access Journals (Sweden)

    Aharon S. Finestone

    2014-01-01

    Full Text Available A few countries permit women to serve in combat roles, but their long term performance in these positions has not been reported. The incidences of overuse injuries and attrition of 85 male and 235 female recruits in a light infantry brigade was followed in a three-year prospective study. Females were shorter (162 cm, CI 161–163 cm than males (174 cm, CI 173–176, had more body fat (18.9 kg, CI 18.2–19.6 kg than males (12.6 kg, 11.3–13.8 kg, had lower V˙O2max (36.8 mL·min−1·kg−1, CI 35.8–37.78 mL·min−1·kg−1 than males (50.48 mL·min−1·kg−1, CI 48.4 to 52.48 mL·min−1·kg−1, had more stress fractures (21.0%, 95% CI 16.2–26.5% than males (2.3%, CI 0.3–8.2%, and had more anterior knee pain (41.2%, CI 34.9–47.7% than males (24.7%, CI 16.0–35.2%. Three-year attrition was 28% CI 22–34% for females and 37% CI 26–48% for males. The females in this study successfully served as light infantry soldiers. Their lower fitness and high incidence of overuse injuries might impede service as regular infantry soldiers.

  3. Nato Multinational Brigade Interoperability: Issues, Mitigating Solutions and is it Time for a Nato Multinational Brigade Doctrine?

    Directory of Open Access Journals (Sweden)

    Schiller Mark

    2016-06-01

    Full Text Available Multinational Brigade Operations involving NATO and its European Partners are the norm in the post-Cold War Era. Commonplace today are Multinational Brigades, composed of staffs and subordinate units representing almost every NATO Country and Partner, participating in training exercises or actual operations in both the European and Southwest Asian Theatres. Leadership challenges are prevalent for the Multinational Brigade Commander and his staff, especially those challenges they face in achieving an effective level of brigade interoperability in order to conduct successful operations in NATO’s present and future operating environments. The purpose of this paper is twofold: to examine the major interoperability obstacles a multinational brigade commander and his staff are likely to encounter during the planning and execution of brigade operations; and, to recommend actions and measures a multinational brigade commander and his staff can implement to facilitate interoperability in a multinational brigade operating environment. Several key interoperability topics considered integral to effective multinational brigade operations will be examined and analysed to include understanding partner unit capabilities and limitations facilitated by an integration plan, appropriate command and support relationships, compatible communications, synchronized intelligence and information collection, establishing effective liaison, and fratricide prevention. The paper conclusion will urge for a NATO land brigade doctrine considering doctrine’s critical importance to effective brigade command and control interoperability and the expected missions a land brigade will encounter in future NATO operating environments as part of the NATO Very High Readiness Joint Task Force (VJTF.

  4. Development of Brigade Staff Tasks for the COBRAS II Brigade Staff Exercise

    National Research Council Canada - National Science Library

    Deter, Daniel

    1998-01-01

    ... and development of simulation-based training for the conventional mounted brigade staff. The work was performed under a project called Combined Arms Operations at Brigade Level, Realistically Achieved Through Simulation (COBRAS).

  5. The Combined Arms Role of Armored Infantry.

    Science.gov (United States)

    1985-01-01

    imbalance of its mechanized formations. It lacked the capability of bringing infantry to battle under armor . [57] Without mobile means for its...equipped with firing ports, permitting mounted infantry to deliver fires while under armor . These fires are primarily burst-on-target, limited range, small...infantry with tanks under armor . Although Bradley-equipped forces may take on limited independent -* missions, they can do so only when the general

  6. A Learning Organization Born in the Crucible of Combat: The 3rd Infantry Brigade, 2nd Division, in World War I

    Science.gov (United States)

    2016-06-10

    infantrymen were massacred by artillery and machine guns every few months, American officers continued to focus on the weapons they knew and loved ...machine guns was excellent. The best relationship and spirit existed between the marines, the 9th Infantry, and the regiment.106...68 level had to exert great effort to restart forward movement.”135 Again Burress, the 23rd operations officer, paints a vivid picture of the night

  7. CERN Fire Brigade rescue simulation

    CERN Multimedia

    Maximilien Brice

    2004-01-01

    The CERN Fire Brigade is made up of experienced firemen from all of the 20 Member States. In these images they are seen at a 'Discovery Monday' held at the Microcosm exhibition. Here visitors learn how the Fire Brigade deal with various situations, including a simulated cave rescue performed by the Hazardous Environments Response Team.

  8. Report to Congress on Sustainable Ranges, 2012

    Science.gov (United States)

    2012-05-01

    4ID AVN BDE HQ, 41st Fires BDE, 4th Sustainment BDE, 7-158 AVN (-), 6-52 AVN (-), 11th MP BN, 308th MI BDE, 21st Cavalry BDE (Air Combat), TF Odin, 1st...Army Division West HQ, 120 Infantry BDE, 166th AVN , 479 FA BDE, 407 AFSB, 901 SPT BN, 15th Sustainment BDE, 36th EN BDE, 89th MP BDE, 57th SIG BDE...1st Maneuver Enhancement Brigade; 162nd Infantry Training Brigade; the JRTC Operations Group; the 115th CSH and the 5th AVN BN. Home station unit

  9. Army Instructors’ Use of Mobile Devices in the Infantry Advanced Leaders Course

    Science.gov (United States)

    2014-08-01

    attenuate 3G /4G signal strength. When network access is inhibited, so too is the usefulness of the mobile device. Therefore, if cellular service is...Benning? Do you have 2G , 3G , or 4G connectivity? Do you have the same connectivity at the other installations where MTTs are usually conducted? Are there...Research Report 1975 Army Instructors’ Use of Mobile Devices in the Infantry Advanced Leaders Course Richard L

  10. Assessment of Psychophysiological Response and Specific Fine Motor Skills in Combat Units.

    Science.gov (United States)

    Sánchez-Molina, Joaquín; Robles-Pérez, José J; Clemente-Suárez, Vicente J

    2018-03-02

    Soldiers´ training and experience can influence the outcome of the missions, as well as their own physical integrity. The objective of this research was to analyze the psycho-physiological response and specific motor skills in an urban combat simulation with two units of infantry with different training and experience. psychophysiological parameters -Heart Rate, blood oxygen saturation, glucose and blood lactate, cortical activation, anxiety and heart rate variability-, as well as fine motor skills were analyzed in 31 male soldiers of the Spanish Army, 19 belonging to the Light Infantry Brigade, and 12 to the Heavy Forces Infantry Brigade, before and after an urban combat simulation. A combat simulation provokes an alteration of the psycho-physiological basal state in soldiers and a great unbalance in the sympathetic-vagal interaction. The specific training of Light Infantry unit involves lower metabolic, cardiovascular, and anxiogenic response not only previous, but mainly after a combat maneuver, than Heavy Infantry unit's. No differences were found in relation with fine motor skills, improving in both cases after the maneuver. This fact should be taken into account for betterment units´ deployment preparation in current theaters of operations.

  11. The Fire Brigade is training for the LHC

    CERN Multimedia

    2007-01-01

    Rescue exercise at Point 8: the CERN Fire Brigade works to save a virtual victim trapped under scaffolding in the LHCb cavern.The CERN Fire Brigade really is unique. Its mission is made even more difficult by the fact that it must be capable of responding to situations underground, in many kilometres of tunnels and dozens of shafts. These specialist skills have to be honed in preparation for LHC commissioning. With a view to meeting these requirements, the "Preparing for the LHC" training course was held for the second time on 23 and 24 May. "The aim of the course is to allow the Fire Brigade to familiarise itself with and use all the resources available in the event of a problem in the tunnel", explains Gilles Colin, who is in charge of training for the CERN Fire Brigade. The two-day programme is designed to train fire Brigade members in the techniques used to free and release trapped victims. Through a series of theoretical sess...

  12. 77 FR 31909 - The Designation of Abdallah Azzam Brigades, Also Known as Abdullah Azzam Brigades, Also Known as...

    Science.gov (United States)

    2012-05-30

    ... DEPARTMENT OF STATE [Public Notice 7899] The Designation of Abdallah Azzam Brigades, Also Known as... Abdullah Azzam Brigades, committed, or poses a significant risk of committing, acts of terrorism that... States. Consistent with the determination in section 10 of Executive Order 13224 that ``prior notice to...

  13. News from the Fire Brigade

    CERN Multimedia

    Gunther Schoenwerth

    2010-01-01

    During the two weeks before the Christmas shutdown, the members of the Fire Brigade’s Social Club managed to sell nearly 900 Fire Brigade calendars for 2010. We would like to thank all of you who bought one. Thanks to your generosity, we will be able to donate about 5000 Swiss francs to the children of Kanji, one of the Staff Association’s long-term fund-raising projects. Thank you again for your support, and best wishes for 2010. President of the CERN Fire Brigade Social Club

  14. The Effects of Posture, Body Armor and Other Equipment on Rifleman Lethality

    National Research Council Canada - National Science Library

    Kramlich, Gary R., II

    2005-01-01

    ...? This study quantifies the effects of Soldier equipment on lethality through multi-factor logistic regression using data from range experiments with the 1st Brigade, 1st Infantry Division (Mechanized...

  15. Fire brigade organization and training at nuclear power plants

    International Nuclear Information System (INIS)

    Currie, J.L.

    1977-01-01

    Management support necessary for the successful organization and training of a fire brigade is outlined. Brigade staffing is discussed and elements of the training program are outlined. The importance of a complete emergency plan is also discussed

  16. One Among Many: Building Partner Capacity in a Multinational Command

    Science.gov (United States)

    2012-03-20

    initiative-life/ (accessed March 10, 2012). UNESCO defines literacy as “The ability to read and write with understanding a simple statement related...Nations Educational, Scientific, and Cultural Organization, “ UNESCO Institute for Statistics Glossary,” 2006, http://glossary.uis.unesco.org/glossary...Command Brief, briefing slides, Fort Polk, LA , February 8, 2012 and MAJ John A. Redford, Brigade Operations Officer, 162d Infantry Brigade, Fort

  17. Staff Performance Analysis: A Method for Identifying Brigade Staff Tasks

    National Research Council Canada - National Science Library

    Ford, Laura

    1997-01-01

    ... members of conventional mounted brigade staff. Initial analysis of performance requirements in existing documentation revealed that the performance specifications were not sufficiently detailed for brigade battle staffs...

  18. The Effects of Terrain on a System of Systems

    Science.gov (United States)

    2008-12-01

    31 d. Obstacle Clearance Rates .......................................................31 e. Armor – Number of Hits to Kill ...Infantry Soldiers 4 x detachments 3 x Mine Ploughs 3 x Tractors UAV section 1 x UAV 11 c. Scenario Defender’s (RED) Basic Deployment: At the...x Mine Ploughs 3 x Tractors MECHANIZED INFANTRY BRIGADE ARMR BN MI BN UAV section 1 x UAV 15 INF BN ARMR BNARMR BNINF COY MORTAR PL ARMR

  19. Identifying British Army infantry recruit population characteristics using biographical data.

    Science.gov (United States)

    Kiernan, M D; Arthur, A; Repper, J; Mukhuty, S; Fear, N T

    2016-04-01

    The infantry accounts for more than a quarter of the British Army but there is a lack of data about the social and educational background of its recruits. To provide an insight into British Army infantry recruits' personal, social and educational background prior to enlistment. The study sample consisted of infantry recruits who enlisted into the British Army School of Infantry. Each recruit completed a 95-item biographical questionnaire. Descriptive statistics were used to describe the sample in terms of demographic, physical, personal, social and educational attributes. The study sample consisted of 1000 male recruits. Over half of the recruits were consuming alcohol at a hazardous or harmful level prior to enlistment and 60% of recruits had used cannabis prior to joining the Army. Academic attainment was low, with the majority of recruits achieving GCSE grade C and below in most subjects, with 15% not taking any examinations. Over half the recruits had been in trouble with the police and either been suspended or expelled from school. Substance misuse and poor behaviour are highly prevalent among recruits prior to enlistment. Taken alongside existing evidence that some of these problems are commonplace among personnel in regular service, the assumption that the British Army infantry is, in itself, a cause of these behaviours should be questioned. © The Author 2015. Published by Oxford University Press on behalf of the Society of Occupational Medicine. All rights reserved. For Permissions, please email: journals.permissions@oup.com.

  20. Rapid Wall-Breaching Kit, Ingress Hole Determination Experiment

    National Research Council Canada - National Science Library

    Turner, Daniel D; Carstens, Christian B; Redden, Elizabeth S; Whalen, Joseph B

    2003-01-01

    .... The experiment was conducted at McKenna Military Operations in Urban Terrain (MOUT) site Ft. Benning, Georgia. Soldiers from the Ranger Training Brigade and Headquarters Company 3/11th Infantry participated in the experiment...

  1. The Military Decision-Making Process (MDMP): A Prototype Training Product

    National Research Council Canada - National Science Library

    Wampler, Richard

    1998-01-01

    ...): A Prototype Training Product. The MDMP product is a computer-based, stand alone training support package to assist individuals and staffs of light infantry brigades in learning to participate in the military decision-making process...

  2. The Brigade Combat Team - Stability and Security Force Assistance Operations

    Science.gov (United States)

    2010-02-22

    it makes absolute sense to embed these transition teams within the brigade, assigned within the brigade. The beauty of this is that it allows the...accessed October 19, 2009). 22 COL Peter Newell, “Department of Defense Bloggers Roundtable with COL Peter Newell, Subject: Completion of Advise and

  3. The radiation protection units of the Austrian fire brigades

    International Nuclear Information System (INIS)

    Aspek, W.; Schoenhacker, S.

    2009-01-01

    Since the 1960s, Austrian fire brigades have been involved in radiation protection. With the preparations for the NPP Zwentendorf and the building of the research reactor in Seibersdorf, the first radiation protection units of the fire brigade were founded. 45 years later: The NPP Zwentendorf never saw its start-up, the use of nuclear energy for the production of electricity is prohibited by a constitutional law, and the research reactor is being decommissioned. What's left are the radiation protection units of the fire brigades. The contribution gives an overview of similarities and differences of the radiation protection units in the nine federal states of Austria, with a special focus on equipment, training and organisation. Nation-wide guidelines and regulations for the tactics of first responders at radiological emergencies are presented and a couple of incidents will be analysed. (orig.)

  4. On the robustness of bucket brigade quantum RAM

    Science.gov (United States)

    Arunachalam, Srinivasan; Gheorghiu, Vlad; Jochym-O'Connor, Tomas; Mosca, Michele; Varshinee Srinivasan, Priyaa

    2015-12-01

    We study the robustness of the bucket brigade quantum random access memory model introduced by Giovannetti et al (2008 Phys. Rev. Lett.100 160501). Due to a result of Regev and Schiff (ICALP ’08 733), we show that for a class of error models the error rate per gate in the bucket brigade quantum memory has to be of order o({2}-n/2) (where N={2}n is the size of the memory) whenever the memory is used as an oracle for the quantum searching problem. We conjecture that this is the case for any realistic error model that will be encountered in practice, and that for algorithms with super-polynomially many oracle queries the error rate must be super-polynomially small, which further motivates the need for quantum error correction. By contrast, for algorithms such as matrix inversion Harrow et al (2009 Phys. Rev. Lett.103 150502) or quantum machine learning Rebentrost et al (2014 Phys. Rev. Lett.113 130503) that only require a polynomial number of queries, the error rate only needs to be polynomially small and quantum error correction may not be required. We introduce a circuit model for the quantum bucket brigade architecture and argue that quantum error correction for the circuit causes the quantum bucket brigade architecture to lose its primary advantage of a small number of ‘active’ gates, since all components have to be actively error corrected.

  5. Religious Support in the Division XXI Heavy Brigade

    National Research Council Canada - National Science Library

    Keller, Eric

    2001-01-01

    Force XXI technology changes the war-fighting doctrine of the US Army. The new digital technology combined with changes in the design of the force structure created a new mechanized infantry or armor division...

  6. L-026: EPR-First Responders: Action Guides Extinguishing Fire Brigades

    International Nuclear Information System (INIS)

    2011-01-01

    This conference will cover how and when to apply the Fire Brigades. Instructions and guidelines within the IAEA-EPR-First Responders to be used to guide the fire fighting brigade in a radiological emergency response to radioactive material in a manner that will minimize risks while performing the task. It will take into consideration the use of several types of monitoring equipment such as oxygen level meters, sight explosive, chemical meters and radiation detectors

  7. How to call the Fire Brigade

    CERN Multimedia

    2003-01-01

    The telephone numbers for the CERN Fire Brigade are: 74444 for emergency calls 74848 for other calls Note The number 112 will stay in use for emergency calls from "wired" telephones, however, from mobile phones it leads to non-CERN emergency services.

  8. Enhancing Brigade Combat Team Adaptability

    Science.gov (United States)

    2010-06-11

    Developing Learning Infrastructures (Training, Education , Practice, Research, Doctrine) -Create a shared vision -Build the business case (assess/Buy...To effectively respond to the characteristics of the operational environment, Brigade Combat Teams must be able to learn constantly from experience...behavior. Organizational adaptive behavior consists of three supporting emergent behaviors which are: self-organization, learning , and organizational

  9. A study of operation of station fire brigade with comparison for Japan and the U.S

    International Nuclear Information System (INIS)

    Ichiki, Kuniyasu

    2011-01-01

    With the occurrence of a fire at Kashiwazaki Kariwa No. 3 unit on a site transformer when Niigata Chuetsu Offshore Earthquake occurred in 2007, the movement of establishing station fire brigade broke out all over Japan. Fire brigade of U.S. power stations is an organization structured with the standards of clear requirements. Some of station fire event reports include examples of activation of station fire brigade. Preparing station fire brigade with good expertise is quite meaningful on the viewpoint of ruling out significant threats of fire against nuclear safety, such as Browns Ferry station fire occurred in 1975. The purpose of this study is to extract useful knowledge through making research on examples of operations of station fire brigade of both Japan and the U.S. As for fire occurrence, relatively frequent fires are seen at Japanese stations with miscellaneous components or some material for works. In the U.S., on the other hand, we can identify relatively frequent fires occurred with important equipment. This might make fire brigades of the U.S. well-prepared for fire fighting by establishing fire-coping strategies for every location in the station. Also, in some stations, fire brigade is continuously trained to enhance its firefighting and rescuing abilities. With the aspect of training of brigades, they are often assembled with devoted staff, which enable them acquiring frequent training and educations to improve their skills further. Fire fighting and rescuing are inevitably dangerous task. This is why frequent training is essential in order to prevent injuries and to keep up their motivation. Unfortunately, the circumstance for brigades in Japan is not helpful enough in experiencing special training needed for them. We have to figure out some way to get over such disadvantages. (author)

  10. The European Union’s Headline Goal: An Operational Assessment

    Science.gov (United States)

    2002-09-01

    strong between the United States and the rest of Europe. The 1956 Suez Crisis did not scar relations between the UK and the United States to the...Support Logistics UK 6 Light Infantry Brigade HQ & Augmentees 7 Light/Medium Armoured Companies UK 8 Medical Collective Protection Role 3

  11. Strategic Airlift and the Objective Force Brigade

    National Research Council Canada - National Science Library

    Waters, Jeffrey J

    2003-01-01

    ... to support the Army goal of deployment anywhere in the world within 96 hours. Background information describing the Army Transformation Program will present a framework for understanding the crucial role of the Objective Force brigade...

  12. The Fire Brigade acquires a new ambulance with all the bells and whistles!

    CERN Multimedia

    Anaïs Schaeffer

    2012-01-01

    On 19 April the Fire Brigade unveiled its latest acquisition: a brand-new ambulance specially designed for CERN.   One of the Fire Brigade's two ambulances has just been replaced by a state-of-the-art vehicle tailor-made to meet CERN's unique requirements. At 4.6 metres long it's much more spacious than its predecessors, providing plenty of room for patient, doctor and paramedic. The ambulance's design and manufacture are the result of a successful collaboration between the Fire Brigade and the technicians from Profile Vehicles, the Finnish company that won the contract following a call for tenders launched in June 2011. "It took us six months to finalise the specification for our new ambulance," explains Patrick Berlinghi, who is responsible for the Fire Brigade's logistics. "We wanted it to be spacious enough for us to be able to work comfortably and to have the latest safety and patient care equipment.  We also reques...

  13. HOW TO CALL THE CERN FIRE BRIGADE

    CERN Multimedia

    2002-01-01

    The telephone numbers of the CERN Fire Brigade are: 74444 for emergency calls 74848 for other calls Note The number 112 will stay in use for emergency calls from 'wired' telephones, however, from mobile phones it leads to non-CERN emergency services.  

  14. HOW TO CALL THE CERN FIRE BRIGADE

    CERN Multimedia

    2002-01-01

    The telephone numbers of the CERN Fire Brigade are: 74444 for emergency calls 74848 for other calls Note The number 112 will stay in use for emergency calls from 'wired' telephones, however, from mobile phones it leads to non-CERN emergency services.

  15. HOW TO CALL THE CERN FIRE BRIGADE

    CERN Multimedia

    2001-01-01

    The telephone numbers of the CERN Fire Brigade are: 74444 for emergency calls 74848 for other calls Note The number 112 will stay in use for emergency calls from 'wired' telephones, however, from mobile phones it leads to non-CERN emergency services.

  16. HOW TO CALL THE CERN FIRE BRIGADE

    CERN Multimedia

    2001-01-01

    The telephone numbers of the CERN Fire Brigade are: 74444 for emergency calls 74848 for other calls Note: the number 112 will stay in use for emergency calls from 'wired' telephones, however, from mobile phones it leads to non-CERN emergency services.

  17. Extreme conditioning programs and injury risk in a US Army Brigade Combat Team.

    Science.gov (United States)

    Grier, Tyson; Canham-Chervak, Michelle; McNulty, Vancil; Jones, Bruce H

    2013-01-01

    Brigades and battalions throughout the US Army are currently implementing a variety of exercise and conditioning programs with greater focus on preparation for mission-specific tasks. An Army physical therapy clinic working with a light infantry brigade developed the Advanced Tactical Athlete Conditioning (ATAC) program. The ATAC program is a unique physical training program consisting of high-intensity aquatic exercises, tactical agility circuits, combat core conditioning, and interval speed training. Along with ATAC, battalions have also incorporated components of fitness programs such as the Ranger Athlete Warrior program and CrossFit (Crossfit, Inc, Santa Monica, CA) an extreme conditioning program (ECP). To determine if these new programs (ATAC, ECP) had an effect on injury rates and physical fitness. Surveys were administered to collect personal characteristics, tobacco use, personal physical fitness training, Army physical fitness test results, and self-reported injuries. Medical record injury data were obtained 6 months before and 6 months after the implementation of the new program. Predictors of injury risk were assessed using multivariate logistic regression. Odds ratios (OR) and 95% confidence intervals (CI) were reported. Injury incidence among Soldiers increased 12% for overall injuries and 16% for overuse injuries after the implementation of the ATAC/ECPs. However, injury incidence among Soldiers not participating in ATAC/ECPs also increased 14% for overall injuries and 10% for overuse injuries. Risk factors associated with higher injury risk for Soldiers participating in ATAC/ECPs included: greater mileage run per week during unit physical training (OR (>16 miles per week÷≤7 miles per week)=2.24, 95% CI, 1.33-3.80); higher body mass index (BMI) (OR (BMI 25-29.9÷BMI<25)=1.77, 95% CI, 1.29-2.44), (OR (BMI =30÷BMI<25)=2.72, 95% CI, 1.67-4.43); cigarette use (OR (smoker÷nonsmoker)=1.80, 95% CI, 1.34-2.42); poor performance on the 2-mile run during

  18. State Websites - The National Guard

    Science.gov (United States)

    , 5/19th Special Forces Group (A) Company B, 1-184th Infantry Regiment JFHQ, Headquarters and Brigade Combat Team (IBCT) 115th Regional Support Group 118th Maintenance Company 129th Rescue Wing 144th Fighter Wing 146th Airlift Wing 147th Combat Communications Squadron 149th Chemical Company 149th Combat

  19. The Armored Infantry in the US Force Structure.

    Science.gov (United States)

    1985-12-02

    armored infantry and tank integration occurred during the capture of the town of Troyes , France, in 1944, by Task Force West of the 4th Armored...Singling and Troyes . The same can not be said of the foot infantryman because normally he was not associated with tanks. Such was the case in the previously

  20. Intervention in radiological emergency situations - the missions of the French fire brigades

    International Nuclear Information System (INIS)

    Giordan, D.

    2006-01-01

    The radioactive risks listed in France are: the use of sources in industry, education, research and medical environment, transport, by railways and road, of radioactive sources, and, of course, nuclear installations September 11. brought to attention the possible consequences of a hostile act using radioactive sources. The radiological units, created in 1980, are teams of 7 firemen able to cope with and overcome an incident or an accident of a radioactive nature. According to the level of responsibility, there are 4 levels of competency. Experience is essential to these small teams. The radioactivity engine has numerous materials, in particular radioactivity detectors, adapted for each specific task within the assignments of the C.M.I.R.: marking out of the irradiant and contaminated zones, search for sealed sources, search for contamination in the soiled zone, contamination inspection of persons. There are two radioactive engine in the County of the Yvelines: the first one is a C.M.I.R., the second one is radioactive support engine with: a photon spectrometry lab, a dosimetry headquarters, a decontamination unit. Some fire brigades have been equipped with decontamination units insuring the treatment of twenty contaminated people per hour. This year, we tested the contamination unit with radioactive contamination three times. The technetium 99 m has a half life of six hours. Contaminated victims were dummies. We gained much logical knowledge from these experiments and as a result have revised our operational doctrine and techniques: by example, to gain time in decontamination operation, it is necessary to undress contaminated people precociously, even the shower will be deferred, it is impossible to evaluate good decontamination, in the third part of the unit of account of count rate (doctrine says it is the right place), without special stretcher, who do not fixed contamination, without remove the soiled water tanks, decontamination will take a long time, then it

  1. The Broken Machine: The US Army Division in the Age of Brigade Modularity

    Science.gov (United States)

    2017-05-15

    The Broken Machine: The US Army Division in the Age of Brigade Modularity A Monograph By MAJ James P. Kane Jr. US Army...Division in the Age of Brigade Modularity 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) MAJ James P. Kane Jr...doctrine, organization, and training, form no longer follows function. The transition to modularity in the early 2000s shifted the primary element of

  2. Improving the Marine Corps Reserve Infantry Battalion: Manning, Training, Integration, and Retention

    National Research Council Canada - National Science Library

    Parrish, Ross A

    2008-01-01

    .... Recognizing that all Marine Corps reserve infantry battalions have deployed at least once in support of the GWOT, further improvements in the manning, training, integration, and retention within...

  3. Primary care provision by volunteer medical brigades in Honduras: a health record review of more than 2,500 patients over three years.

    Science.gov (United States)

    Martiniuk, Alexandra L C; Adunuri, Nikesh; Negin, Joel; Tracey, Patti; Fontecha, Claudio; Caldwell, Paul

    2012-01-01

    The weak health system in Honduras contributes to poor health indicators. To improve population health, a number of volunteer medical brigades from developed countries provide health services in Honduras. To date, there is little information on the brigades' activities and impact. The primary objective of this article is to increase understanding of the type of health care provided by voluntary medical brigades by evaluating and presenting data on patients' presenting symptoms, diagnoses, and care outcomes. The article focuses on an ongoing medical brigade organized by Canadian health professionals in conjunction with Honduras' largest national non-governmental organization. This is a descriptive study of data that are routinely collected by volunteer Canadian health care professionals. Data on all patients presenting to temporary primary health care facilities across Honduras between 2006 and 2009 were analyzed. The data were used to analyze patient demographics, presenting symptoms, diagnoses, and treatments. We found that the brigades provide additional human resources to the relatively weak Honduran health care system. However, while brigades may increase solidarity between Hondurans and Canadians, concerns persist regarding cost-effectiveness and continuity of care for conditions treated by short-term brigade volunteers. Greater scrutiny is needed to increase brigades' effectiveness and ensure they are supportive of domestic health systems.

  4. Changing Attitudes among South African Prisoners of War towards ...

    African Journals Online (AJOL)

    The Battle of Sidi Rezegh in November 1941 and the fall of Tobruk in June 1942 were disastrous for South Africa. At Sidi Rezegh, the entire 5th South African Infantry Brigade was lost and at Tobruk the following year more than 10 000 South Africans were captured by German forces. As if the shock of becoming prisoners of ...

  5. fireforce - one man's war in the rhodesian light infantry

    African Journals Online (AJOL)

    "They have the faces of boys but they fight like lions". The history of the Rhodesian Light Infantry is an illustrious one. The. RLI produced many of the senior brass who led the Rhodesian Army including Gen Peter Walls. It was arguably Rhodesia's premier fighting unit (if one excludes Rhodesia's two special forces outfits, the ...

  6. Risk factors for injury associated with low, moderate, and high mileage road marching in a U.S. Army infantry brigade.

    Science.gov (United States)

    Schuh-Renner, Anna; Grier, Tyson L; Canham-Chervak, Michelle; Hauschild, Veronique D; Roy, Tanja C; Fletcher, Jeremy; Jones, Bruce H

    2017-11-01

    Road marching is an important physical training activity that prepares soldiers for a common occupational task. Continued exploration of risk factors for road marching-related injuries is needed. This analysis has assessed the association between modifiable characteristics of physical training and injury risk. Injuries in the previous 6 months were captured by survey from 831 U.S. Army infantry soldiers. Road marching-related injuries were reported as those attributed to road marching on foot for specified distances while carrying equipment. Frequencies, means, and relative risk ratios (RR) for road marching-related injury with 95% confidence intervals (CI) were calculated. Adjusted odds ratios (OR) and 95% CI were calculated for leading risk factors using multivariable logistic regression. Retrospective cohort study. Half (50%) of reported injuries were attributed to road marching or running. When miles of exposure were considered, injury risk during road marching was higher than during running (RR road marching/running =1.8, 95% CI: 1.38-2.37). A higher product of road marching distance and weight worn (pound-miles per month) resulted in greater injury risk (RR ≥1473 pound-miles/Road marching-related injuries were associated with carrying a load >25% of one's body weight (OR >25%/1-20% =2.09, 95% CI: 1.08-4.05), having high occupational lifting demands (OR 50-100+lbs/25-50lbs =3.43, 95% CI: 1.50-7.85), road marching ≥5 times per month (OR ≥5 times/4 times =2.11, 95% CI: 1.14-3.91), and running road marching-related injuries. Since this is not always operationally feasible, reducing the cumulative overloading from both physical training and occupational tasks may help prevent injury. Published by Elsevier Ltd.

  7. The Light Infantry Division Regionally Focused for Low Intensity Conflict

    Science.gov (United States)

    1990-06-01

    Infantry: Indispensable Element of a Balanced Force." AM (June 1985): 26-41. Dodd, Norman L. "Counter Insurgency and Internal Security perations...5410 LTC Smallwood Major Kerry Abington USACGSC USACGSC ATTN: DJCO ATrN: CTAC Ft. Leavenworth, KS Ft. Leavenworth, KS 303 Dr. Harold R. Winton Army-Air

  8. Design Considerations of a Lower Limb Exoskeleton System to Assist walking and Load-Carrying of Infantry Soldiers

    OpenAIRE

    Yu, Seungnam; Han, Changsoo; Cho, Ilje

    2014-01-01

    This paper describes the development of a wearable exoskeleton system for the lower extremities of infantry soldiers and proposes appropriate design criteria based on existing case studies. Because infantry soldiers carry a variety of equipment, the interference with existing equipment and additional burden of the exoskeleton support system should be minimized. Recent studies have shown that a user only needs to be supported in the gravitational direction when walking on flat terrain; however...

  9. Counter-Improvised Explosive Device Fusion Cells and the Brigade Combat Team: A Modern Day Imperative

    Science.gov (United States)

    2013-12-10

    Center Observer Controller/Trainer Mentors. Lieutenant Colonel Kevin Brown , Brigade Special Troop Battalion Lead Observer Controller/Trainer Mentor...December 2010): 13-19. Joint Readiness Training C-IED Lead Observer Controller/Trainer Mentors. Lieutenant Colonel Kevin S. Brown , Brigade Special... Gareth . “How the U.S. Quietly Lost the IED War in Afghanistan.” Inter Press Service News Agency (10 June 2013). Powledge, Timothy R. “Beating the

  10. Sensor data fusion for automated threat recognition in manned-unmanned infantry platoons

    Science.gov (United States)

    Wildt, J.; Varela, M.; Ulmke, M.; Brüggermann, B.

    2017-05-01

    To support a dismounted infantry platoon during deployment we team it with several unmanned aerial and ground vehicles (UAV and UGV, respectively). The unmanned systems integrate seamlessly into the infantry platoon, providing automated reconnaissance during movement while keeping formation as well as conducting close range reconnaissance during halt. The sensor data each unmanned system provides is continuously analyzed in real time by specialized algorithms, detecting humans in live videos of UAV mounted infrared cameras as well as gunshot detection and bearing by acoustic sensors. All recognized threats are fused into a consistent situational picture in real time, available to platoon and squad leaders as well as higher level command and control (C2) systems. This gives friendly forces local information superiority and increased situational awareness without the need to constantly monitor the unmanned systems and sensor data.

  11. Effectiveness Of The Individual Riflemen In An Infantry Squad

    Science.gov (United States)

    2017-12-01

    2017 3. REPORT TYPE AND DATES COVERED Master’s thesis 4. TITLE AND SUBTITLE EFFECTIVENESS OF THE INDIVIDUAL RIFLEMEN IN AN INFANTRY SQUAD 5...STATEMENT Approved for public release. Distribution is unlimited. 12b. DISTRIBUTION CODE 13. ABSTRACT (maximum 200 words) Our research ...part of the model is a qualitative approach that examines other potential risk factors. We analyze, normalize, and weigh the performance factors for

  12. Re-forging the Iron Division: The Reconstitution of the 28th Infantry Division between the Huertgen and the Ardennes

    Science.gov (United States)

    2015-05-21

    twisting forest road, the Kall Trail, as the Division’s main supply route. These factors, among others, eventually led to a tragedy of catastrophic...carl.army.mil/eto/eto-003.pdf. 8 The GI Offensive in Europe: The Triumph of American Infantry Divisions, 1941-1945, published in 1999. Robert Rush...The Ordeal and Triumph of an American Infantry Regiment (Lawrence: University Press of Kansas, 2001), 302, 304; Drea. 15 Weaver; Holt; Harry M. Kemp

  13. The influence of the Ratel infantry fighting vehicle on mobile warfare ...

    African Journals Online (AJOL)

    This article traces the story of how the author and a number of daring young commanders and soldiers had cast aside military textbooks in developing their own military doctrine for mobile warfare, South African style. It is clear that the Ratel infantry fighting vehicle had wielded huge influence on the development and ...

  14. Engineer Analysis of the Light Infantry Division (ELID). Volume 1

    Science.gov (United States)

    1986-12-01

    m 5. Forward logistics protection a. FARP b. Brigade petroleum, oil , and lubricant (POL) berms P P *Positlon may not be dug in if...battalion in order to complete all of the squad and equipment corabat- essencial requirements. With Che adrittion of the EAD force, there is a large

  15. Hunting The Ghost Gun: An Analysis Of The U.S. Army Infantry Rifle

    Science.gov (United States)

    2016-03-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT HUNTING THE GHOST GUN : AN ANALYSIS OF THE U.S. ARMY......LEFT BLANK iii Approved for public release; distribution is unlimited HUNTING THE GHOST GUN : AN ANALYSIS OF THE U.S. ARMY INFANTRY

  16. The 91st Infantry in World War I -- Analysis of an AEF Division’s Efforts to Achieve Battlefield Success

    Science.gov (United States)

    2013-06-13

    collaboration with John J. Pershing, “Who Won the War” ( Typescript copy held in the Duane N. Diedrich Collection, Clements Library, University of...trusted to luck.”74 73The Training and Employment of Divisions, 1918, 71. 74Diary of Lieutenant Charles H. Paul, 364th Infantry, 91st Division ( typescript ...accessed 19 May 2013). Diary of Gaylen Snow, 362nd Infantry, 91st Division. Typescript held at Brigham Young University, UT. 79 Diary of Lieutenant

  17. The Simulation Operations Officer in a Sustainment Brigade

    Science.gov (United States)

    2016-05-17

    exercise . FA57 core competencies (sim- ulation supported training, battle command systems integration, and operational KM) range across all six warfi...want to assist FA57s who will be assigned to sustain- ment brigades in the future and to describe the training exercises and road to war (RTW) that...bomb during a convoy live-fire exercise at Peason Ridge, north of Fort Polk, Louisiana. (Photo by Sgt. 1st Class Clinton Wood) July–August 2015

  18. ARMY NATIONAL GUARD: Enhanced Brigade Readiness Improved but Personnel and Workload Are Problems

    National Research Council Canada - National Science Library

    2000-01-01

    .... Reserve units such as the National Guard's 15 Enhanced Separate Brigades, the Guard's highest priority combat units, provide fighting forces at about 2530 percent of the cost of active units due...

  19. Assessing the Army National Guard's Enhanced Brigade Concept: Searching for Readiness and Relevance

    National Research Council Canada - National Science Library

    Greene, Richard

    2003-01-01

    The Army's Enhanced Brigades were created in the early 1990s to correct readiness deficiencies discovered in the unsuccessful mobilization of Army National Guard combat units for the Persian Gulf War...

  20. The Urban Warrior: What are the Dismounted Infantry Skills Necessary to Survive in Today's Urban Fighting

    National Research Council Canada - National Science Library

    Glaze, George

    2000-01-01

    The topic of this thesis is Military Operations on Urbanized Terrain (MOUT). Specifically, certain essential skills for the dismounted infantry soldier are lacking in today's training, doctrine, and skills...

  1. Discovery Mondays - Men of fire: the fire brigade show their mettle

    CERN Multimedia

    2004-01-01

    Flashover and backdraught, these technical terms refer to two of the most dangerous phenomena associated with fires. In order to train in dealing with them, in the course of their fire fighting duties the CERN fire brigade use special simulation equipment. The demonstrations are rather spectacular... Thrills are therefore guaranteed at the next Discovery Monday on 2 February! In the course of the evening, you will see fire-fighters demonstrate climbing techniques including abseiling, a method they would have to use to access underground structures on the CERN site in the event of an accident. The accomplished climbers (the Hazardous Environments Response Team) will provide detailed explanations of the rescue techniques and procedures they use in tunnels and hazardous environments. CERN firemen simulate the backdraft phenomena for training. The demonstration, which you will have the opportunity to observe, on the next Discovery Monday, is spectacular. However, the remit of the CERN fire brigade goes well b...

  2. Discovery Mondays - Men of fire: the fire brigade show their mettle

    CERN Multimedia

    2004-01-01

    Flashover and backdraught, these technical terms refer to two of the most dangerous phenomena associated with fires. In order to train in dealing with them, in the course of their fire fighting duties the CERN fire brigade use special simulation equipment. The demonstrations are rather spectacular... Thrills are therefore guaranteed at the next Discovery Monday on 2 February! In the course of the evening, you will see fire-fighters demonstrate climbing techniques including abseiling, a method they would have to use to access underground structures on the CERN site in the event of an accident. The accomplished climbers (the Hazardous Environments Response Team) will provide detailed explanations of the rescue techniques and procedures they use in tunnels and hazardous environments. However, the remit of the CERN fire brigade goes well beyond fire-fighting. It ranges from monitoring confined spaces to dealing with flooding and preventing chemical hazards. A wide range of equipment enables them to fulfil thei...

  3. Relevance of Army National Guard Infantry Units in the Force Structure and Their Role in Combat

    National Research Council Canada - National Science Library

    Harris, Brian

    2004-01-01

    ...% of a total force of 346,848 assigned. Such large numbers are staggering considering that National Guard infantry units are not being utilized according to their organization training and equipment...

  4. Training in Information Management for Army Brigade and Battalion Staff: Methods and Preliminary Findings

    National Research Council Canada - National Science Library

    Freeman, Jared

    1997-01-01

    Training, training Support software, and measurement instruments were developed to help Army brigade and below staff manage information and overcome information overload in a digital messaging environment...

  5. 30 Brigade Combat Teams: Is the Army too Small

    Science.gov (United States)

    2016-12-01

    brigade combat teams, Army end strength, boots on the ground to dwell time ratio 15. NUMBER OF PAGES 57 16. PRICE CODE 17. SECURITY CLASSIFICATION...into contingency operations (Bonds, Baiocchi, and McDonald 2010). Consequently, such a significant change in end strength has had an equally...Baiocchi and McDonald 2010). 11 The reason behind these findings was the increase in operational tempo attributed to the increased demand in both

  6. Fit for the frontline? A focus group exploration of auditory tasks carried out by infantry and combat support personnel

    Directory of Open Access Journals (Sweden)

    Zoë L Bevis

    2014-01-01

    Full Text Available In order to preserve their operational effectiveness and ultimately their survival, military personnel must be able to detect important acoustic signals and maintain situational awareness. The possession of sufficient hearing ability to perform job-specific auditory tasks is defined as auditory fitness for duty (AFFD. Pure tone audiometry (PTA is used to assess AFFD in the UK military; however, it is unclear whether PTA is able to accurately predict performance on job-specific auditory tasks. The aim of the current study was to gather information about auditory tasks carried out by infantry personnel on the frontline and the environment these tasks are performed in. The study consisted of 16 focus group interviews with an average of five participants per group. Eighty British army personnel were recruited from five infantry regiments. The focus group guideline included seven open-ended questions designed to elicit information about the auditory tasks performed on operational duty. Content analysis of the data resulted in two main themes: (1 the auditory tasks personnel are expected to perform and (2 situations where personnel felt their hearing ability was reduced. Auditory tasks were divided into subthemes of sound detection, speech communication and sound localization. Reasons for reduced performance included background noise, hearing protection and attention difficulties. The current study provided an important and novel insight to the complex auditory environment experienced by British infantry personnel and identified 17 auditory tasks carried out by personnel on operational duties. These auditory tasks will be used to inform the development of a functional AFFD test for infantry personnel.

  7. Fit for the frontline? A focus group exploration of auditory tasks carried out by infantry and combat support personnel.

    Science.gov (United States)

    Bevis, Zoe L; Semeraro, Hannah D; van Besouw, Rachel M; Rowan, Daniel; Lineton, Ben; Allsopp, Adrian J

    2014-01-01

    In order to preserve their operational effectiveness and ultimately their survival, military personnel must be able to detect important acoustic signals and maintain situational awareness. The possession of sufficient hearing ability to perform job-specific auditory tasks is defined as auditory fitness for duty (AFFD). Pure tone audiometry (PTA) is used to assess AFFD in the UK military; however, it is unclear whether PTA is able to accurately predict performance on job-specific auditory tasks. The aim of the current study was to gather information about auditory tasks carried out by infantry personnel on the frontline and the environment these tasks are performed in. The study consisted of 16 focus group interviews with an average of five participants per group. Eighty British army personnel were recruited from five infantry regiments. The focus group guideline included seven open-ended questions designed to elicit information about the auditory tasks performed on operational duty. Content analysis of the data resulted in two main themes: (1) the auditory tasks personnel are expected to perform and (2) situations where personnel felt their hearing ability was reduced. Auditory tasks were divided into subthemes of sound detection, speech communication and sound localization. Reasons for reduced performance included background noise, hearing protection and attention difficulties. The current study provided an important and novel insight to the complex auditory environment experienced by British infantry personnel and identified 17 auditory tasks carried out by personnel on operational duties. These auditory tasks will be used to inform the development of a functional AFFD test for infantry personnel.

  8. Evaluating the Effectiveness of Game-Based Training: A Controlled Study with Dismounted Infantry Teams

    Science.gov (United States)

    2013-01-01

    use of a multiplayer game to train infantry company commanders. Proceedings of the 2009 Interservice/Industry Training, Simulation, and Education...Gigabyte RAM Video/Graphics Card NVIDIA Geforce 7900 GTX Audio Legacy audio; stereo sound (non-3D) Software Version VBS2 VTK Release 1.4 - BIA

  9. Organizing cross-border fire brigade response in the Dutch-German border region

    NARCIS (Netherlands)

    Boersma, F.K.; Engelman, E.

    2012-01-01

    This article addresses the opportunities and problems with cross-border collaboration between the Dutch and German fire brigades. The following are the main problems: 1) no uniformity in concluding and using the cross-border agreements for emergency assistance, 2) the language problem, 3) the

  10. Inventari del Fons SIDBRINT (Memòria Històrica de les Brigades Internacionals) CRAI Biblioteca del Pavelló de la República (Universitat de Barcelona)

    OpenAIRE

    Universitat de Barcelona. CRAI Biblioteca del Pavelló de la República; Giralt i Esteve, Olga

    2017-01-01

    Fons del Portal sobre les Brigades Internacionals SIDBRINT (Sistema d’Informació Digital sobre les Brigades Internacionals) s’inicià l’any 2010 com a projecte de recerca del Ministerio de Ciencia e Innovación (HAR2010-20983) i actualment és un portal institucional de la Universitat de Barcelona. Es el primer i únic web que tracta de la recuperació de la memòria històrica de les Brigades Internacionals.

  11. Reorganizing for Global War: General Malin Craig and the Triangular Infantry Division, 1935-1939

    Science.gov (United States)

    2014-05-22

    reduced to a battalion and the signal battalion to a company. The assets that were formerly pooled in the square division’s sanitary trains were...BIBLIOGRAPHY “Arms Before Men,” Time. Army and Navy. August 22, 1938. Clay , Lieutenant Colonel (Ret.) Steven E. The Arms: Major Commands and Infantry

  12. Spontaneous cure of American cutaneous leishmaniasis due to Leishmania naiffi in two Dutch infantry soldiers

    NARCIS (Netherlands)

    van der Snoek, E. M.; Lammers, A. M.; Kortbeek, L. M.; Roelfsema, J. H.; Bart, A.; Jaspers, C. A. J. J.

    2009-01-01

    We report two Dutch infantry soldiers who acquired American cutaneous leishmaniasis (ACL) during military jungle training in Surinam. The lesions had existed for 3 and 5 months, respectively, before the soldiers presented for treatment. The lesions occurred on the head and right thigh, and were

  13. The fire brigade renovates

    CERN Multimedia

    2002-01-01

    The new fire engine at CERN's Fire Station. A shiny brand-new fire engine is now attracting all the attention of the members of CERN's fire brigade. Since the beginning of last week this engine has taken over from an 18-year-old one, which has now been 'retired' from service. This modern vehicle, built in Brescia, Italy, is much lighter and more powerful than the old one and is equipped to allow the fire service to tackle most call-outs without the support of at least one other vehicle, as is currently necessary. The new fire engine is designed to transport six fire-fighters, 2000 litres of water, and is equipped not only for fire fighting actions but also to respond initially to any other kind of call-out, such as traffic accidents, chemical incidents, pollution, lightning, etc. It goes almost without saying that it is provided with the most modern safety measures, a low centre of gravity, as well as a special chassis and a combination pump (low and high pressure), which improve the safety and performance ...

  14. U. S. Army Chemical Corps Historical Studies, Gas Warfare in World War I: The 32nd Division Advances to Fismes, August 1918

    Science.gov (United States)

    1959-04-01

    ithdrawing tc ards the Bois de la Planchette . At once enemy artillery opened up on Cierges and the area to the south and for almost four hours...take the Bois de la Planchette , while the 64th Brigade advanced to Hill 230 to turn the strong point at Bellevue Farm. Planchette was to be directly...through the western edge of the Bois Meuniere and Patis de Chamery in the French sector. 4 3 For the attack on Planchette , the 126th Infantry replaced the

  15. JPRS Report, Soviet Union, Political Affairs, Volkogonov’s Political Portrait of Stalin

    Science.gov (United States)

    1990-11-09

    paneled with treated oak. Stalin continued to pace up and down along the long table draped in green cloth, with a large map showing the operational...tank and two mechanized corps, 20 infantry and 46 Armour brigades were moved in Stalingrad’s direction at the Stavka’s order between July 1 and...body, a squat torso and rather long arms and legs. The military tunic showed a pouch draped in the Marshall’s uniform. He had thin hair and a pock

  16. Cooperation between regional fire brigades and EDF's power plants

    International Nuclear Information System (INIS)

    Gaudin, B.; Pigeon, M.

    2000-01-01

    An emergency plan has been worked out at each nuclear power plant. This plan involves public authorities, regional fire brigades, hospitals, and EDF's own emergency means. This organization implies that in case of emergency both outside help and intern means have to cooperate efficiently on the site. In order to clarify roles and order hierarchy, common intervention protocols have been written and tested. Joint exercises involving outside help and intern means are regularly organized to test the emergency organization and train the staff. (A.C.)

  17. 77 FR 6865 - Pricing for 2012 Infantry Soldier Silver Dollar and 2012 Star-Spangled Banner Commemorative Coin...

    Science.gov (United States)

    2012-02-09

    ... DEPARTMENT OF THE TREASURY United States Mint Pricing for 2012 Infantry Soldier Silver Dollar and... Treasury. ACTION: Notice. SUMMARY: The United States Mint is announcing adjusted pricing for the 2012...-Spangled Banner Bicentennial Silver N/A 53.95 Dollar Set The introductory pricing period for the 2012...

  18. Reactor accidents and the actions of fire brigades. Plea for nuclear phaseout. An analytic report on Leipzig, Windscale, Chernobyl and Fukushima; Reaktorunfaelle und die Handlungen der Feuerwehr. Plaedoyer fuer den Atomausstieg. Ein Analysebericht zu Leipzig, Windscale, Tschernobyl und Fukushima

    Energy Technology Data Exchange (ETDEWEB)

    Steffler, Reinhard

    2016-11-01

    The report covers the historically first fire brigade action at the ''uranium machine'' on June 23th 1942 in Leipzig, and the fire brigade actions in Windscale (October 11, 1957), Chernobyl and Fukushima Daiichi. Further issues are the behavior of the media, selected features of the fire brigade actions, and a discussion of questions concerning the preparedness of the fire brigades.

  19. Design Considerations of a Lower Limb Exoskeleton System to Assist walking and Load-Carrying of Infantry Soldiers

    Directory of Open Access Journals (Sweden)

    Seungnam Yu

    2014-01-01

    Full Text Available This paper describes the development of a wearable exoskeleton system for the lower extremities of infantry soldiers and proposes appropriate design criteria based on existing case studies. Because infantry soldiers carry a variety of equipment, the interference with existing equipment and additional burden of the exoskeleton support system should be minimized. Recent studies have shown that a user only needs to be supported in the gravitational direction when walking on flat terrain; however, active joints are necessary to support walking over rough and sloped terrain such as mountains. Thus, an underactuated exoskeleton system was considered: passive joints are applied to the hip and ankle joints, and active joints are applied to the knee joints to exploit the dynamic coupling effect of the link structure and muscular activation patterns when the user is going up and down stairs. A prototype of the exoskeleton system was developed and validated through a simple stair-climbing experiment.

  20. Plan for Combat Operations (Battlefield Function 18) as Accomplished by a Heavy Brigade. Volume 2: Assessment Package

    National Research Council Canada - National Science Library

    Mullen, William

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade, to include combat support and combat service support units...

  1. Dental health status and treatment needs in the infantry regiment of the Malaysian Territorial Army.

    Science.gov (United States)

    Jasmin, Borhan; Jaafar, Nasruddin

    2011-04-01

    The aim of this study was to determine the dental health status and treatment needs of personnel in the Infantry Regiment of the Malaysian Territorial Army (TA).This cross-sectional study involved stratified and systematic random sampling with a total sample size of 300. Dental health status and treatment needs were assessed using the standard WHO oral assessment criteria (1997). The prevalence of caries experience was 96% (mean ± SD DMFT [decayed, missing, filled teeth] = 8.0 ± 5.5). Active decay prevalence was high (85%; mean ± SD = 3.6 ± 3.1) indicating high unmet treatment need. Missing teeth prevalence was high (69%; mean ± SD = 2.8 ± 3.7). Filled teeth prevalence was low (56%, mean ± SD = 1.5 ± 2.0). In all, 90% of participants required some form of dental treatment, of whom 85% required restorative treatment, 5% advanced restorative treatment, 36.7% extractions, and 45.3% prosthetic treatment. These findings suggest that there was a high need for dental treatment in the Infantry Battalions of Malaysian TA Regiments and the service must be made available to cater to the needs.

  2. 78 FR 50050 - Record of Decision for the Construction and Operation of an Infantry Platoon Battle Course at...

    Science.gov (United States)

    2013-08-16

    ... (group) tactical movement techniques, and to detect, identify, engage, and defeat stationary and moving... of an Infantry Platoon Battle Course at P[omacr]hakuloa Training Area, Hawai`i AGENCY: Department of... Course (IPBC) and associated infrastructure at P[omacr]hakuloa Training Area (PTA), Hawai`i. This...

  3. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  4. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  5. Integrated system of occupational safety and health and fire protection of the fire rescue brigades members.

    Science.gov (United States)

    Božović, Marijola; Živković, Snežana; Mihajlović, Emina

    2018-06-01

    The objective of the conducted research is the identification and determination of requirements of members of fire rescue brigades during operations in the conditions of high risk in order to minimize the possibilities for injury incidence during the intervention. The research is focused on examination, determination and identification of factors affecting the increasing number of occupational injuries of members of fire rescue brigades during interventions. Hypothetical framework of the research problem consists of general hypothesis and six special hypotheses. Results suggest that almost all respondents believe that their skills and abilities are applicable in the intervention phase, but less than a half believe that their skills are applicable in prevention phase. Two-thirds of respondents stated that in their organization they have support for further education and upgrading while a half of respondents stated that they need education concerning identification, assessment and management of risks that can lead to emergency situations.

  6. The Quality of Quantity: Mini-UAVS As An Alternative UAV Acquisition Strategy at the Army Brigade Level

    National Research Council Canada - National Science Library

    Weed, Shawn

    2002-01-01

    This monograph asks should the U.S. Army alter its current UAV acquisition strategy for maneuver brigades from one in which limited numbers of high capability systems are acquired, in favor of another that fields a large quantity...

  7. Dispersion modeling of accidental releases of toxic gases - utility for the fire brigades.

    Science.gov (United States)

    Stenzel, S.; Baumann-Stanzer, K.

    2009-09-01

    Several air dispersion models are available for prediction and simulation of the hazard areas associated with accidental releases of toxic gases. The most model packages (commercial or free of charge) include a chemical database, an intuitive graphical user interface (GUI) and automated graphical output for effective presentation of results. The models are designed especially for analyzing different accidental toxic release scenarios ("worst-case scenarios”), preparing emergency response plans and optimal countermeasures as well as for real-time risk assessment and management. The research project RETOMOD (reference scenarios calculations for toxic gas releases - model systems and their utility for the fire brigade) was conducted by the Central Institute for Meteorology and Geodynamics (ZAMG) in cooperation with the Viennese fire brigade, OMV Refining & Marketing GmbH and Synex Ries & Greßlehner GmbH. RETOMOD was funded by the KIRAS safety research program of the Austrian Ministry of Transport, Innovation and Technology (www.kiras.at). The main tasks of this project were 1. Sensitivity study and optimization of the meteorological input for modeling of the hazard areas (human exposure) during the accidental toxic releases. 2. Comparison of several model packages (based on reference scenarios) in order to estimate the utility for the fire brigades. For the purpose of our study the following models were tested and compared: ALOHA (Areal Location of Hazardous atmosphere, EPA), MEMPLEX (Keudel av-Technik GmbH), Trace (Safer System), Breeze (Trinity Consulting), SAM (Engineering office Lohmeyer). A set of reference scenarios for Chlorine, Ammoniac, Butane and Petrol were proceed, with the models above, in order to predict and estimate the human exposure during the event. Furthermore, the application of the observation-based analysis and forecasting system INCA, developed in the Central Institute for Meteorology and Geodynamics (ZAMG) in case of toxic release was

  8. Combat Operations in Mountainous Terrain: Are United States Army Light Infantry Divisions Preparing Properly?

    Science.gov (United States)

    1987-06-05

    Mountain Division, Charles Hauptman, Comeany I. 97th Mountain Infantry Regiment by CPT George Earle, and PFC Hugh Graves (1945), and 10th Mountain...training in this country is believed to depend primarily ’Albert H. Jackman , "The Tenth Mountain Division, A Successful Experiment," The Algine Journal...44-48. Houston, Charles S., Dr. "Altitude Sickness and the Army," 112zard. 2d Qtr 1986: n.p. Jackman , Albert H. "The Tenth Mountain Division, A

  9. The Marine Corps' infantry selection and assignment process: is it ready for gender neutrality?

    OpenAIRE

    Stooksbury, William Thorpe.

    1994-01-01

    Approved for public release; distribution is unlimited Opportunities for women in the military continue to expand. At some point in the future, the Marine Corps may be compelled to address the assimilation of women into combat arms occupational specialties. Existing high attrition rates in the Marine Corps' infantry specialties indicate a flawed selection and assignment process resulting in a poor fit of the person to the job. Because of gender differences, this problem will be magnified i...

  10. The Big Five personality and temperamental traits and its correlation with styles of coping with stress in the fire brigade officers

    Directory of Open Access Journals (Sweden)

    Justyna Szrajda

    2017-09-01

    Full Text Available Selecting specific professional activities (e.g. a brigade officer and methods for coping with difficult situations may result from personal predispositions of a given person. Personality is founded on the innate temperament. The way of dealing with stress depends on personality traits whose influence is manifested, amongst other things, in the selection of specific coping styles. The current study aim to examine the level of correlation between personality and temperamental traits with manifested coping styles. The study covered 58 volunteers – male fire brigade officers. The following tools were used: Personality Inventory, NEO-FFI, Formal Characteristics of Behaviour: Temperament Inventory – Revised Version, FCZ-KT (R and Coping Inventory for Stressful Situations, CISS. Emotion-focused coping style for stressful situations correlates with the following traits: positively, with perseveration (r=0.5115 and with emotional reactivity (r=0.4927, and negatively, with briskness (r=-0.3926 and endurance (r=-0.5408. The task-oriented coping style for stressful situations correlates positively with extraversion (r=0.3236 and conscientiousness (r=0.3088, and negatively with neuroticism (r=-0.3368 in the NEO-FFI. The emotion-focused coping style for stressful situations is positively correlated with neuroticism (NEO-FFI (r=0.4150. In fire brigade officers, As far as personality traits were concerned, fire brigade officers scored relatively high in extraversion, conscientiousness and low in neuroticism and were likely to demonstrate the task-oriented coping style for stressful situations. Lower level of perseveration and high level of briskness and endurance were associated with emotion-focused coping style for stressful situations. Similarly, the tendency to focus on emotions experienced in stressful situations were associated with high level of neuroticism in the study group.

  11. Physical Training Programs in Light Infantry Units: Are They Preparing Soldiers for the Rigors of Combat?

    Science.gov (United States)

    2001-01-01

    selection is made which ensure further injury is not incurred during evacuation. As a result, the basic task identified is carry. Demanding Physical Tasks...greatest amount of force a muscle or muscle group can exert in a single effort.3 An example, in very simple terms, would be an Olympic weightlifter ...Olympic weightlifters lift as much as possible in one lift. This requires a great amount of strength. A need for strength in light infantry soldiers is

  12. Direct and Lead Units in Execution of Battle (Battlefield Function 20) as Accomplished by a Heavy Brigade. Volume 2: Assessment Package

    National Research Council Canada - National Science Library

    Mullen, William

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade, to include combat support and combat service support units...

  13. Plan for Combat Operations (Battlefield Function 18) as Accomplished by an Engineer Battalion Supporting a Heavy Brigade. Volume 1: Function Analysis

    National Research Council Canada - National Science Library

    Anderson, Martin

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade, to include combat support and combat service support units...

  14. Plan for Combat Operations (Battlefield Function 18) as Accomplished by an Engineer Battalion Supporting a Heavy Brigade. Volume 2: Assessment Package

    National Research Council Canada - National Science Library

    Mullen, William

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade to include combat support and combat service support units...

  15. Effect of Mandatory Unit and Individual Physical Training on Fitness in Military Men and Women.

    Science.gov (United States)

    Anderson, Morgan K; Grier, Tyson; Canham-Chervak, Michelle; Bushman, Timothy T; Nindl, Bradley C; Jones, Bruce H

    2017-09-01

    The purpose of this study was to look at the effect of additional individual physical training (PT) in addition to mandatory unit PT as well as other risk factors on physical fitness. A cross-sectional design. This study was conducted on a US military installation. Participants were 6290 male and 558 female active duty US Army soldiers in 3 light infantry brigades. Participants completed self-administered questionnaires asking about individual characteristics, PT, and physical fitness. Cut points were established for soldiers scoring within the top 33% for each of the 3 Army Physical Fitness Test events (2-mile run, sit-ups, and push-ups) and top 50% in each of the tests combined for overall performance. Odds ratios and 95% confidence intervals from multivariate analyses were calculated. Variables impacting physical fitness performance of men and women included increased body mass index, leading unit PT sessions, and individual distance running mileage. Other variables impacting physical performance for men included increased age, smoking, and individual resistance training. Soldiers performing additional individual PT demonstrated a positive influence on fitness compared to unit PT participation alone. Increased age and being overweight/obese negatively influenced physical fitness. To enhance fitness performance through unit PT, running by ability groups and resistance training should be encouraged by leadership.

  16. The Effect of Personnel Stability on Marine Corps Readiness: Are Infantry Battalions Ready to Respond to Future Conflicts?

    Science.gov (United States)

    2015-12-01

    shortages below 85% of structure ( McHugh et al., 2006). The primary finding in the CNA report relating to officer staffing within infantry battalions...was a systemic shortage for MAGTF intelligence officers ( McHugh et al., 2006). Shortages will likely continue to occur in high demand/low density...This issue was also addressed by McHugh et al. (2006), a CNA study that proposes including the number a PMOS is over or under structure in

  17. The effect of stress fracture interventions in a single elite infantry training unit (1983-2015).

    Science.gov (United States)

    Milgrom, Charles; Finestone, Aharon S

    2017-10-01

    Stress fractures can be seen as an undesired byproduct of demanding physical training. The threshold value of stress that places an individual bone at high risk for stress fracture has not been identified. In a prospective study of stress fractures in 1983, a 31% incidence was found during demanding Israeli infantry basic training by bone scan criteria. Within a subgroup of these recruits, an elite infantry unit was found to have a 40% incidence. Since then and until 2015, eight additional induction companies of the same elite infantry unit were prospectively monitored for stress fractures during their basic training. In all of the studies, stress fracture surveillance and the examining orthopedist were the same. A retrospective review of all nine studies and of eight training changes was performed to look for a temporal trend in stress fracture incidence and to see if these might be related to training changes. There was a statistically significant trend for lower radiological proven stress fractures (p=0.0001) and radiological proven stress fractures plus clinical stress fractures (p=0.0013), as well as lower stress fracture severity by radiological criteria (p=0.0001) between 1983 and 2015. The only training change that was associated, by multivariate logistic regression, with a decreased incidence of stress fracture was restricting training to the authorized training protocol (odds ratio, 3874; 95% CI, 1.526 to 9.931; p=0.004). Increased recruit weight was found by multivariate analysis to be associated with lower stress fracture incidence (odds ratio 1.034; 95% CI, 1.00 to 1.070; p=0.051). Moving the training to a base with flatter terrain and reducing the formal marching distance by 1/3 was associated with a decrease in high grade stress fractures (odds ratio, 10.03; 95% CI, 3.5 to 28.4; p=0.0001). Neither the combined changes of enforcing a seven hour a night sleep regimen, training in more comfortable boots and adding a physical therapist to the unit nor

  18. Direct and Lead Units in Execution of Battle (Battlefield Function 20) as Accomplished by an Engineer Battalion Supporting a Heavy Brigade. Volume 2: Assessment Package

    National Research Council Canada - National Science Library

    Mullen, William

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade to include combat support and combat service support units...

  19. Take Active Air Defense Measures (Battlefield Function 16) as Accomplished by a Heavy Brigade with a Subordinate Air Defense Artillery Battery. Volume 1: Function Analysis

    National Research Council Canada - National Science Library

    Whitley, Allen

    1997-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade, to include combat support and combat service support units...

  20. [The organizational characteristics of the medical support for the troops in the first operations at the start of a war (based on the experience of exercises)].

    Science.gov (United States)

    Iziumtsev, I S

    1995-03-01

    The article summarized the experience of an explorative tactical-special exercise on medical support of Mobile Forces in first military operations of the initial period of war which has studied the following questions: the organic structure and organization of work of the medical service of a motorized infantry brigade in defense; joint direction of organic hospital facilities and field traumatological hospital. The author also studies the deployment peculiarities of a military multipurpose hospital on the basis of a garrison hospital. The experience of these exercises has proved the necessity to update the organic structure and principles of the employment of medical assets in accordance with the requirements of new military doctrine, as well as realize the technical re-equipment of medical service.

  1. Heavy precipitation and the responses within emergency management - a new approach for emergency planning and disaster prevention by utilizing fire brigade operation data

    Science.gov (United States)

    Kutschker, Thomas; Glade, Thomas

    2015-04-01

    An increase of intense rainfall events in the center regions of Europe is one of the assumed effects of climate change. Climate scenarios indicate also large seasonal and regional differences concerning the magnitude. Structural damages and financial loss resulting from heavy precipitation depend on natural parameters such as topography and vegetation cover of the specific area, but also on socio-economic parameters such as urbanized and industrialized areas, population density and the presence of critical infrastructure. In particular mudflows and floods cause damages such as flooded basements and streets, undercutting of roads or spilled sewage drains. The emergency management has to consider these effects appropriately. Commonly, this is the responsibilities is taken by the fire brigades and civil protection units. Within their daily routines, numerous data is collected, but commonly not utilized for scientific purposes. In particular fire brigade operation data can be used accordingly to describe the intensity of the aftermath when heavy precipitation strikes a certain area. One application is described in this study based on a example in Offenbach, Germany. The civil protection in Germany is based on a federal system with a bottom-up command-structure and responsibility to the local community. Therefore it is not easy to collect the overall incident data for a widespread affected area. To examine particular local effects of heavy precipitation events it is necessary to match the meteorological data provided by the German Meteorological Service (DWD) with the incident data of all effected fire brigades, which sometimes is impeded by the usual resolution of meteorological data. In this study, a method of comprehensive evaluation of meteorological data and the operation data from local fire brigades has been developed for the Rhine-Main-Area. This area is one of the largest metropolitan regions in Germany with a very high density in population as well as

  2. Detection and Avoidance of Mines and Boobytraps in South Vietnam -- Training and Tactical Procedures of the 1st Infantry Division

    Science.gov (United States)

    1968-03-01

    Persons intervieý!ed included engineer and infantry personnel, both officers and enlisted imen. Interviews were conducted in five different major...1󈨈 *1 The George Washiingion iniversity HUlMAN RES•OURCIES IRESEARCH’I OFFI’CE oileraling tinder rontract with THE’ i•E•AIITMENT 9F THlE AIIMV 80 6...frotm one of the five major commands furnishing data. It is divided into two sections. The first section consists of interview suimmiaries which

  3. Direct and Lead Units During Preparation for the Battle (Battlefield Function 19) as Accomplished by an Engineer Battalion Supporting a Heavy Brigade. Volume 1: Function Analysis

    National Research Council Canada - National Science Library

    Clagg, Robert

    1998-01-01

    The purpose of the overall research program was to document the synchronization required by command and control tasks performed within the armored brigade, to include combat support and combat service support units...

  4. Division and Brigade Stationing System: Installation Data Book.

    Science.gov (United States)

    1988-04-01

    composed of 0 partly decomposed moss, leaves , and twigs, matted together with many fine rootlets. In permafrost areas, destruction of this mat...Valley desert drainage basin and only about 10 percent of the drainage leaves the reservation. Most of the runoff flows into the basin from all...and Dillingham are in the lantana-koa- haole shrub zone. Wheeler.AAF and much of Schofield Barracks are in a zone of open guava forest and shrubs

  5. Proposal of a concept of the land brigade C4ISR system

    Directory of Open Access Journals (Sweden)

    Mladen M.Manjak

    2011-04-01

    Full Text Available This paper describes the structure of a concept of the land brigade command information system that is a product of the research work of numerous experts throughout the years done in the then-Yugoslav Army, Army of Serbia and Montenegro and today's Army of the Republic of Serbia. The institution formed for this purpose is the Centre for Command Information Systems and Information Support where command information systems are studied continuously and systematically. Today the KIS represents a primary source needed to obtain an efficient military command management system and an instrument for multiplying combat power without increasing the number of units and combat resources. The KIS is a complex multidisciplinary system requiring the implementation of prototype evolution methodology. Due to its complexity, importance end sensitivity, the KIS has to be realized in one's own military R&D institutions belonging to the Ministry of defense, because only these institutions have adequate knowledge and facilities. Fast and ad-hoc solutions in this area are unacceptable from the military, specialized and economic point of view. The primary KIS br KoV structure concept relies on six types of KIS, five technical subsystems and a number of adequate information systems. The key segment are technical systems that represent one open technical and technological (hardware and software platform in the realization of any KIS type. The KIS is a dynamic permanent system following the users' needs and technical technology changes. It is not, therefore, a closed and finally defined system, it is the system in continuous evolution, under construction and implementations. Introduction The concept described in this paper is the result of work of numerous people, authors included, engaged in the last twenty years of KIS research. The real balance of forces in combat does not depend so much on the potentials of warring parties but rather on the efficiency of command of

  6. Let's keep in touch

    CERN Document Server

    Anaïs Schaeffer

    2012-01-01

    The GS, IT and PH Departments are currently finalising the installation of a new digital radio communication system. Known as TETRA, the system has been specially designed to meet emergency communication needs and will be used by the CERN Fire Brigade from next January.   A delicate operation: one of the three radio antennae of the TETRA communication system is installed on top of the water tower on the Meyrin site. Photo: Anthony Grossir. A blurred image followed by a blank screen. Marc has collapsed while carrying out maintenance work on technical equipment. It's 6.00 a.m., he's on his own and there's little chance of the firemen being alerted in time to save him. This scenario, although already unlikely today, will be impossible with the arrival of the new TETRA communication system. TETRA is a digital radio communication system already in service in many fire brigades across Europe. It will soon be used by the CERN Fire Brigade, as well as by hundreds of CERN pers...

  7. Dispersion modeling of accidental releases of toxic gases - Comparison of the models and their utility for the fire brigades.

    Science.gov (United States)

    Stenzel, S.; Baumann-Stanzer, K.

    2009-04-01

    Dispersion modeling of accidental releases of toxic gases - Comparison of the models and their utility for the fire brigades. Sirma Stenzel, Kathrin Baumann-Stanzer In the case of accidental release of hazardous gases in the atmosphere, the emergency responders need a reliable and fast tool to assess the possible consequences and apply the optimal countermeasures. For hazard prediction and simulation of the hazard zones a number of air dispersion models are available. The most model packages (commercial or free of charge) include a chemical database, an intuitive graphical user interface (GUI) and automated graphical output for display the results, they are easy to use and can operate fast and effective during stress situations. The models are designed especially for analyzing different accidental toxic release scenarios ("worst-case scenarios"), preparing emergency response plans and optimal countermeasures as well as for real-time risk assessment and management. There are also possibilities for model direct coupling to automatic meteorological stations, in order to avoid uncertainties in the model output due to insufficient or incorrect meteorological data. Another key problem in coping with accidental toxic release is the relative width spectrum of regulations and values, like IDLH, ERPG, AEGL, MAK etc. and the different criteria for their application. Since the particulate emergency responders and organizations require for their purposes unequal regulations and values, it is quite difficult to predict the individual hazard areas. There are a quite number of research studies and investigations coping with the problem, anyway the end decision is up to the authorities. The research project RETOMOD (reference scenarios calculations for toxic gas releases - model systems and their utility for the fire brigade) was conducted by the Central Institute for Meteorology and Geodynamics (ZAMG) in cooperation with the Vienna fire brigade, OMV Refining & Marketing GmbH and

  8. Breaching the Devil’s Garden: The 6th New Zealand Brigade in Operation Lightfoot. The Second Battle of El Alamein

    Science.gov (United States)

    2005-01-01

    Civitavecchia. This school had been established at the end of March 1940 and organized by an Oberst Steiner of the German Army. The Guastatori were taught to...Jallschirmpioniere (airborne combat engineers), detached from Major Rudolf Witzig’s I 11 (Korps) Fallschirmpioniere Battalion to Ramcke’s brigade...F, Annex 2. Major Rudolf Witzig, Knight’s Cross winner for leading the famous reduction of Fort Eben Emael, later commanded the 21" tallschirmpionier

  9. Fiscal Law Course (76th)

    National Research Council Canada - National Science Library

    2007-01-01

    This course prepares students to meet the needs of a general military attorney, contracting officer, resource manager, or practitioner serving a Brigade Combat Team or higher echelon, installation, or agency...

  10. Determination of the capabilities of a detachment for neutralizing chemical attack effects in the brigade defense zone

    Directory of Open Access Journals (Sweden)

    Dejan R. Inđić

    2012-04-01

    Full Text Available This paper presents one possible way of deploying detachments for neutralizing the effects of chemical attacks in a brigade defense zone. The detachment composition is provisional and depends on the assessment of whether the enemy in the incoming combat will use weapons of mass destruction. A detachment consists of several organizational units: medical care forces, chemical reconnaissance forces, forces for the establishment of combat efficiency and chemical decontamination forces. The capabilities of the mentioned forces depend on their size, equipment, training level, extent of effects and combat conditions. The paper indicates a potential to overcome the gap in the provisions after disbanding the Army Corps.

  11. Bucket Brigades to Increase Productivity in a Luxury Assembly Line

    Directory of Open Access Journals (Sweden)

    Filippo De Carlo

    2013-08-01

    Full Text Available One of the most challenging issues in manual assembly lines is to achieve the best balance of workloads. There are many analytic approaches to solve this problem, but they are often neglected, since they are time-consuming and require high level engineering skills. Fashion bags packaging lines must comply with a number of different products with low production volumes, while the organization of the line is often under the mere responsibility of the foreman, who balances workloads in an empirical way. The aim of this work is to evaluate the effectiveness of the arrangement of bucket brigades (BBs for an assembly line of luxury handbags. To do this, it was decided to perform a testing activity in a company producing fashion handbags in order to compare the self-made design with the BBs and with a simple assembly line balancing problem algorithm. The originality of this research lies in the fact that there are no studies in the literature on BBs applied to the packaging of highly variable small batches. The results were excellent, showing the advantages of BBs in terms of flexibility, the reduction of work in the process and the ability to handle small anomalies.

  12. The Applicability of 360 Degree Feedback Performance Appraisal System: A Brigade Sample

    Directory of Open Access Journals (Sweden)

    Hakan TURGUT

    2012-03-01

    Full Text Available On the subject of measuring individual performances, which considered to be one of the fundamental functions of the human resources management process, 360 Degree Feedback Performance Appraisal System (360 DFPAS preferred for taking into account more than one aspect while providing opportunities in order to achieve more objective results. It’s been thought that the applicability of the above mentioned method is not investigated enough in the public sector where most of the employments take place in Turkey. The purpose of this study is to probe into the applicability of the 360 DFPAS on low and mid-level managers in a brigade. Within this framework, differences between the raters (manager, subordinate, peer, client, self-evaluation have been examined and comparisons made between traditional performance appraisal and 360 DFPAS. There are meaningful differences only inner client between two different evaluation methods (Traditional manager evalution-360 DFPAS within evaluation raters. But there aren’t any meaningful differences between traditional performance appraisal and 360 DFPAS as whole method.

  13. Resiliency in the Rear Detachment: Using the Rear Detachment (Provisional) as an Integral Part of Building Resiliency in Units at the Brigade and Below for Current and Future Deployments

    Science.gov (United States)

    2010-12-10

    combat, thereby reducing combat stress reactions and symptoms .”4 Brigade Combat Team. A unit usually smaller than a division to which are...conflict and most importantly into the foreseeable future.”30 Training soldiers to be master resiliency trainers is a gigantic step in getting the concept

  14. Infantry Small-Unit Mountain Operations

    Science.gov (United States)

    2011-02-01

    should be on the uphill side of grass tussocks, small talus, and other level spots to avoid twisting an ankle or straining an Achilles tendon...should be extremely cautious while traveling on the side of a hill. During side-hill travel personnel are more vulnerable to twisted ankles , back injury...installation in the mountains is the fixed rope system. A fixed rope is a rope anchored in place to assist Soldiers in movement over difficult terrain

  15. Transformational leadership and group interaction as climate antecedents: a social network analysis.

    Science.gov (United States)

    Zohar, Dov; Tenne-Gazit, Orly

    2008-07-01

    In order to test the social mechanisms through which organizational climate emerges, this article introduces a model that combines transformational leadership and social interaction as antecedents of climate strength (i.e., the degree of within-unit agreement about climate perceptions). Despite their longstanding status as primary variables, both antecedents have received limited empirical research. The sample consisted of 45 platoons of infantry soldiers from 5 different brigades, using safety climate as the exemplar. Results indicate a partially mediated model between transformational leadership and climate strength, with density of group communication network as the mediating variable. In addition, the results showed independent effects for group centralization of the communication and friendship networks, which exerted incremental effects on climate strength over transformational leadership. Whereas centralization of the communication network was found to be negatively related to climate strength, centralization of the friendship network was positively related to it. Theoretical and practical implications are discussed.

  16. The Politics of US Feminist Internationalism and Cuba: Solidarities and Fractures on the Venceremos Brigades, 1969-89

    Directory of Open Access Journals (Sweden)

    Karen W. Tice

    2018-03-01

    Full Text Available Despite US travel bans to Cuba, a wide spectrum of US feminist and radical activists defied and crossed geo-political borders to participate in unique modes of solidarity activism and alliances with Cuba revolutionaries. Based on the narratives of US feminist political travellers who joined the Venceremos Brigades, an anti-imperialist radical education project, this article analyses the difficult conversations about feminism, gender politics, homophobia, racism, cultural imperialism, revolutionary priorities, social change strategies, and intersectionality as well as the productive organisational linkages that were generated by this political travel. This article highlights how political differences were both managed and/or silenced within transnational activist encounters, and concludes by suggesting the import of these debates for building and sustaining multi-issue and coalitional affinities within contemporary transnational feminist organising and solidarity delegations.

  17. Effectiveness of battlefield-ethics training during combat deployment: a programme assessment.

    Science.gov (United States)

    Warner, Christopher H; Appenzeller, George N; Mobbs, Angela; Parker, Jessica R; Warner, Carolynn M; Grieger, Thomas; Hoge, Charles W

    2011-09-03

    Breakdowns in the ethical conduct of soldiers towards non-combatants on the battlefield are of grave concern in war. Evidence-based training approaches to prevent unethical conduct are scarce. We assessed the effectiveness of battlefield-ethics training and factors associated with unethical battlefield conduct. The training package, based on movie vignettes and leader-led discussions, was administered 7 to 8 months into a 15-month high-intensity combat deployment in Iraq, between Dec 11, 2007, and Jan 30, 2008. Soldiers from an infantry brigade combat team (total population about 3500) were randomly selected, on the basis of company and the last four digits of each soldier's social security number, and invited to complete an anonymous survey 3 months after completion of the training. Reports of unethical behaviour and attitudes in this sample were compared with a randomly selected pre-training sample from the same brigade. The response patterns for ethical behaviour and reporting of ethical violations were analysed with chi-square analyses. We developed two logistic regression models using self-reported unethical behaviours as dependent variables. Factors associated with unethical conduct, including combat experiences and post-traumatic stress disorder (PTSD), were assessed with validated scales. Of 500 randomly selected soldiers 421 agreed to participate in the anonymous post-training survey. A total of 397 soldiers of the same brigade completed the pre-training survey. Training was associated with significantly lower rates of unethical conduct of soldiers and greater willingness to report and address misconduct than in those before training. For example, reports of unnecessary damage or destruction of private property decreased from 13·6% (54 of 397; 95% CI 10·2-17·0) before training to 5·0% (21 of 421; 2·9-7·1) after training (percent difference -63·2%; pethics training positively influenced soldiers' understanding of how to interact with and treat non

  18. Take heart!

    CERN Multimedia

    Alizée Dauvergne

    2010-01-01

    Recently, ten new semi-automatic defibrillators were installed at various locations around CERN. This is a preventive measure intended to provide cardiac arrest victims with the best possible response. The first responder could be you!   The Director-General has welcomed the initiative of the Medical Service and Fire Brigade for the installation of ten new semi-automatic defibrillators. You have probably seen them on your way to the restaurant, for example:  brand new semi-automatic defibrillators, ready for an emergency. Housed in a white wall-mounted case, the bright red defibrillators are marked with a white heart symbol crossed by a lightning bolt (see photo). The defibrillator is designed so that anyone can use it. “Anyone can use it, you don’t need to be a health professional,” says Dr Reymond from CERN's Medical Service. Together with the CERN Fire Brigade, he is behind the initiative to have these units put in place. And with good reason, as the unit...

  19. Prevalence and impact of short sleep duration in redeployed OIF soldiers.

    Science.gov (United States)

    Luxton, David D; Greenburg, David; Ryan, Jenny; Niven, Alexander; Wheeler, Gary; Mysliwiec, Vincent

    2011-09-01

    Short sleep duration (SSD) is common among deployed soldiers. The prevalence of SSD during redeployment, however, is unknown. Cross-sectional study of a brigade combat team (n = 3152 US Army soldiers) surveyed 90-180 days after completing a 6-15 month deployment to Iraq as part of Operation Iraqi Freedom (OIF). Survey items targeted sleep habits and comorbid medical conditions. Multivariate logistic regression analyses were performed to calculate adjusted odds ratios of medical comorbidities associated with SSD. US Army Infantry Post. All soldiers from a redeploying brigade combat team participated in a health assessment between 90 and 180 days upon return to Ft. Lewis from Iraq. None. A total of 2738 (86.9%) soldiers answered questions regarding self-perceived sleep and were included in the analysis. Mean sleep duration was 5.8 ± 1.2 hours. Nineteen hundred fifty-nine (72%) slept ≤ 6 h, but only 16% reported a daytime nap or felt their job performance was affected due to lack of sleep. Short sleep was more common among soldiers who reported combat exposure. After controlling for combat exposure, short sleep duration (SSD) was associated with symptoms of depression, posttraumatic stress disorder, panic syndrome, and with high-risk health behaviors such as abuse of tobacco and alcohol products, and suicide attempts. SSD is common among redeployed soldiers. Soldiers who experienced combat are at increased risk for persistent SSD and comorbidities associated with SSD. Efforts to reestablish good sleep habits and aggressive evaluation of soldiers with persistent SSD following deployment may aid in the prevention and management of associated medical conditions.

  20. Do Australian Fire Brigades Owe a Common Law Duty of Care? A Review of Three Recent Cases

    Directory of Open Access Journals (Sweden)

    Michael Eburn

    2013-12-01

    Full Text Available The law regarding the fire service’s liability for alleged negligence in the way they plan for or respond to a fire is reasonably untested. This paper reports on three cases that were decided in 2012 by the Supreme Courts of New South Wales, Tasmania and the Australian Capital Territory. It is argued that the weight of authority is that the fire brigades are established to provide fire services for the common good, not for individual benefit, and the financial burden of unfortunate operational decisions should be borne by insurers or by the uninsured. Even so, two Supreme Courts have arrived at different conclusions with respect to the question of whether or not the NSW Rural Fire Service owes a common law duty of care to those at risk from bushfire. It is therefore argued that the issue of duty of care would benefit from a determination by the High Court of Australia.

  1. Fire under control, operating cost too. Wood pellets heating system for the fire brigade building at Gaienhofen on Lake Constance; Feuer unter Kontrolle, Betriebskosten im Griff. Die Feuerwehr in Gaienhofen/Bodensee heizt mit Holzpellets

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, Klaus W.

    2008-11-15

    The fire equipment building of Gaienhofen is a new building on the edge of town, neighbouring the buildings of the local soccer and tennis clubs. All three buildings are serviced by a heating station in the basement of the fire brigade building. A solar system for water heating reduces fuel consumption and minimizes the operating cost. (orig.)

  2. Evaluation of the Mountain Athlete Warrior (MAW) Program in a Light Infantry Brigade, March 2011 February 2012

    Science.gov (United States)

    2016-06-15

    repeatedly pitching a softball . 73. With these definitions in mind, have you had an injury during the past 12 months? If so, how many different times...pulling/pushing objects, or repeatedly pitching a softball . Technical Report No. S.0032423.3-11 D-18 O 13 Pelvic area O 14 Upper leg (thigh

  3. Knee bioelectric impedance assessment in healthy/with osteoarthritis subjects

    International Nuclear Information System (INIS)

    Neves, Eduardo Borba; Pino, Alexandre Visintainer; De Almeida, Renan Moritz Varnier Rodrigues; De Souza, Márcio Nogueira

    2010-01-01

    The present study analyzes parameters estimated by bioelectric impedance spectroscopy (BIS) in subjects with healthy and with osteoarthritis (OA) knees. Thirty-two male volunteers, members of the Parachute Military Infantry Brigade of Rio de Janeiro, Brazil, participated in the study (62 knee joints). Clinical specialists used the Dejour scale for OA classification and divided the subjects into a control (without OA) and a pathological group (with different degrees of OA). BIS data were obtained in a standing position using a BIS technique based on the current response to a step voltage excitation. Differences between groups were measured by means of a Wilcoxon–Mann–Whitney test. Results indicate that raw bioimpedance parameters seem to be sensitive to the physiological changes associated with OA. Thus, data indicate that extra-cellular resistance (Re) and reactance of the equivalent capacitance (Xcx) increase according to the disease intensity (p < 0.001). In conclusion, the BIS technique seems to be able to provide the objective and non-invasive basis for helping the diagnosis of knee OA

  4. Integrated approach to fire safety at the Krsko nuclear power plant - fire protection action plan

    International Nuclear Information System (INIS)

    Lambright, J.A.; Cerjak, J.; Spiler, J.; Ioannidi, J.

    1998-01-01

    Nuclear Power Plant Krsko (NPP Krsko) is a Westinghouse design, single-unit, 1882 Megawatt thermal (MWt), two-loop, pressurized water nuclear power plant. The fire protection program at NPP Krsko has been reviewed and reports issued recommending changes and modifications to the program, plant systems and structures. Three reports were issued, the NPP Krsko Fire Hazard Analysis (Safe Shout down Separation Analysis Report), the ICISA Analysis of Core Damage Frequency Due to Fire at the NPP Krsko and IPEEE (Individual Plant External Event Examination) related to fire risk. The Fire Hazard Analysis Report utilizes a compliance - based deterministic approach to identification of fire area hazards. This report focuses on strict compliance from the perspective of US Nuclear Regulatory Commission (USNRC), standards, guidelines and acceptance criteria and does not consider variations to comply with the intent of the regulations. The probabilistic analysis methide used in the ICISA and IPEEE report utilizes a risk based nad intent based approach in determining critical at-risk fire areas. NPP Krsko has already completed the following suggestions/recommendations from the above and OSART reports in order to comply with Appendix R: Installation of smoke detectors in the Control Room; Installation of Emergency Lighting in some plant areas and of Remote Shout down panels; Extension of Sound Power Communication System; Installation of Fire Annunciator Panel at the On-site Fire Brigade Station; Installation of Smoke Detection System in the (a) Main Control Room Panels, (b) Essential Service Water Building. (c) Component Cooling Building pump area, chiller area and HVAC area, (d) Auxiliary Building Safety pump rooms, (e) Fuel Handling room, (f) Intermediate Building AFFW area and compressor room, and (g) Tadwaste building; inclusion of Auxiliary operators in the Fire Brigade; training of Fire Brigade Members in Plant Operation (9 week course); Development of Fire Door Inspection and

  5. Installing Omeka

    Directory of Open Access Journals (Sweden)

    Jonathan Reeve

    2016-07-01

    Full Text Available Omeka.net is a useful service for Omeka beginners, but there are a few reasons why you might want to install your own copy of Omeka. Reasons include: * Upgrades. By installing Omeka yourself, you can use the latest versions of Omeka as soon as they’re released, without having to wait for Omeka.net to upgrade their system. * Plugins and themes. You can install any plugin or theme you want, without being restricted to those provided by Omeka.net. * Customizations. You can buy a custom domain name, and customize your code to achieve your desired functionality. * Control. You have control over your own backups, and you can update the server yourself so that its security is always up-to-date. * Price. There are many low-cost Virtual Private Servers (VPSs now, some of which cost only $5 per month. * Storage. Many shared hosting providers now offer unlimited storage. This is useful if you have a large media library. In this tutorial, we’ll be entering a few commands on the command line. This tutorial assumes no prior knowledge of the command line, but if you want a concise primer, consult the Programming Historian introduction to BASH. There are other ways of installing Omeka, of course, some using exclusively GUI tools. Some hosting providers even offer “one-click installs” via their control panels. Many of those methods, however, will install older versions of Omeka which are then harder to upgrade and maintain. The method outlined below may not be the easiest way to install Omeka, but it will give you some good practice with using the command line, which is a skill that will be useful if you want to manually upgrade your install, or manually install other web frameworks. (For example, this installation method is very similar to WordPress’s “Five-Minute Install”. There are four steps to this process, and it should take about an hour.

  6. Installation report - Lidar

    DEFF Research Database (Denmark)

    Georgieva Yankova, Ginka; Villanueva, Héctor

    The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project.......The report describes the installation, configuration and data transfer for the ground-based lidar. The unit is provided by a customer but is installed and operated by DTU while in this project....

  7. LHC installation planning

    CERN Document Server

    Weisz, S

    2005-01-01

    installation of the general services, the installation of the cryogenic line (QRL), the installation of the machine elements and the hardware commissioning. While the installation of the general services is now almost finished (see presentation by Katy Foraz and Serge Grillot), several problems and delays with the QRL made it unavoidable to revise the installation strategy and to schedule a number tasks in parallel. A new compressed installation planning has been issued, that fulfils the strategic objectives and allows starting new activities with minimal delays in sectors 7-8 and 8-1. However, the shortcuts that are introduced increase the level of risk that we will have to face and the coordination of such a large and complex variety of simultaneous activities makes the project even more challenging. The document will describe how the input from the different equipment groups is taken into account by the master schedule planning team with respect to equipment availability and production as well as logistics...

  8. Decree 53/1963 of 10 January on the establishment of a radioactivity alarm network

    International Nuclear Information System (INIS)

    1963-01-01

    This Decree provides for the setting up of a radioactivity alarm network by the Directorate General for Public Protection to prevent hazards arising from possible incidents originating in nuclear installations. The Duty stations are located in specified police stations and with fire brigades within a radius ranging from 15 to 20 km from planned reactors or nuclear power plants. (NEA) [fr

  9. USSR Report, Science and Technology Policy, No. 12.

    Science.gov (United States)

    1983-05-09

    association; Kanashchenkov, Vladimir Sergeyevich, fitter brigade leader of the Shatlykgazstroy [ Shatlyk Gas Construction] Trust in the above...director of the production association of Shatlykgazdobycha [ Shatlyk Gas Extraction Trust]; Leshchinskiy, Yuriy Yevgen’yevich, head of a section of...installation of the large Shatlyk gas extraction complex on the basis of progressive technology and native equipment of large unit capacity. 12 19

  10. The Upgraded Plasma Focus Installation > - The Installation >

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Babenko, B.A.; Gorbunov, D.N.; Gurei, A.E.; Kalachev, N.V.; Kozlova, T.A.; Malafeev, Yu.S.; Polukhin, S.N.; Sychev, A.A.; Tikhomirov, A.A.; Tsybenko, S.P.; Volobuev, I.V.

    1999-01-01

    The paper presents the upgraded plasma focus installation > - the installation > and some preliminary experimental results. The total energy stored in capacity bank is now 400 kJ, current - 5 MA with the rise time 3.5 μs. The investigation is targeted on the study of near electrode processes and its influence on plasma dynamics in a special operating regime of Filippov type PF - Hard X-ray regime. (author)

  11. The latest electrical installation (I)

    International Nuclear Information System (INIS)

    Won, Jong Su

    1976-04-01

    This book deals with the latest electrical installation. The contents of this book are construction electrical installation, regulations related electrical installation, foundation and principle of wiring, main line feeder, lighting installation, power of wiring, main line feeder, lighting installation, power installation, method to read structure drawing for electrical construct drawing electric lamp wiring diagram, working drawing, material and tools and method of construction of electrical installation on types of wiring construction, metallic conduit, rigid poly-vinyl conduit wiring, bus duct work, cable work and insulation out of metal lathed.

  12. Structural considerations for solar installers : an approach for small, simplified solar installations or retrofits.

    Energy Technology Data Exchange (ETDEWEB)

    Richards, Elizabeth H.; Schindel, Kay (City of Madison, WI); Bosiljevac, Tom; Dwyer, Stephen F.; Lindau, William (Lindau Companies, Inc., Hudson, WI); Harper, Alan (City of Madison, WI)

    2011-12-01

    Structural Considerations for Solar Installers provides a comprehensive outline of structural considerations associated with simplified solar installations and recommends a set of best practices installers can follow when assessing such considerations. Information in the manual comes from engineering and solar experts as well as case studies. The objectives of the manual are to ensure safety and structural durability for rooftop solar installations and to potentially accelerate the permitting process by identifying and remedying structural issues prior to installation. The purpose of this document is to provide tools and guidelines for installers to help ensure that residential photovoltaic (PV) power systems are properly specified and installed with respect to the continuing structural integrity of the building.

  13. Capping off installation

    CERN Multimedia

    2006-01-01

    Installation of the cathode strip chambers for the muon system on the CMS positive endcap has been completed. Technicians install one of the last muon system cathode strip chambers on the CMS positive endcap. Like successfully putting together the pieces of a giant puzzle, installation of the muon system cathode strip chambers on one of the CMS endcaps has been completed. Total installation of the cathode strip chambers (CSC) is now 91 percent complete; only one ring of chambers needs to be mounted on the remaining endcap to finish installation of the entire system. To guarantee a good fit for the 468 total endcap muon system CSCs, physicists and engineers from the collaboration spent about 10 years carefully planning the design. The endcap muon system's cables, boxes, pipes and other parts were designed and integrated using a 3D computerized model. 'It took a long time to do all the computer modelling, but in the long run it saved us an enormous amount of time because it meant that everything fit together,...

  14. Electrical installation calculations basic

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for basic electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practice. A step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3Fo

  15. Nuclear Installations Act 1965

    International Nuclear Information System (INIS)

    1965-01-01

    This Act governs all activities related to nuclear installations in the United Kingdom. It provides for the licensing procedure for nuclear installations, the duties of licensees, the competent authorities and carriers of nuclear material in respect of nuclear occurrences, as well as for the system of third party liability and compensation for nuclear damage. The Act repeals the Nuclear Installations (Licensing and Insurance) Act 1959 and the Nuclear Installations (Amendment Act) 1965 except for its Section 17(2). (NEA) [fr

  16. Who Blew the Balaklava Bugle?: The Charge of the Light Brigade and the Afterlife of the Crimean War

    Directory of Open Access Journals (Sweden)

    Lara Kriegel

    2015-05-01

    Full Text Available The signal event of the Crimean War, the Charge of the Light Brigade, transpired on 25 October 1854. Its reverberations would, however, last long after, as a battle that was waged in the popular press and in auction rooms across the twentieth century attests. The battle involved a bugle and its provenance. In question were two competing claims to have sounded the charge at the Battle of Balaklava, fought at the height of the Crimean War. Did the distinction belong to Trumpet Major William Brittain or to Trumpet Major Henry Joy? The case, which preoccupied family members and interested parties, was closed some fifty years ago in favour of Brittain’s partisans. Why did the contest attain such longevity? Why did it rage with such fervour? This article offers an answer beyond the simple question of provenance as it charts the twists and turns in the dispute, from the mid-nineteenth century through the moment of resolution in the 1960s. In the process, it attests to the politics of presence on the field of battle. It points, too, to the long afterlife of the Crimean War and the lingering shadow of the Victorian Age.

  17. Electrical installation calculations advanced

    CERN Document Server

    Kitcher, Christopher

    2013-01-01

    All the essential calculations required for advanced electrical installation workThe Electrical Installation Calculations series has proved an invaluable reference for over forty years, for both apprentices and professional electrical installation engineers alike. The book provides a step-by-step guide to the successful application of electrical installation calculations required in day-to-day electrical engineering practiceA step-by-step guide to everyday calculations used on the job An essential aid to the City & Guilds certificates at Levels 2 and 3For apprentices and electrical installatio

  18. Electrical installations and regulations

    CERN Document Server

    Whitfield, J F

    1966-01-01

    Electrical Installations and Regulations focuses on the regulations that apply to electrical installations and the reasons for them. Topics covered range from electrical science to alternating and direct current supplies, as well as equipment for providing protection against excess current. Cables, wiring systems, and final subcircuits are also considered, along with earthing, discharge lighting, and testing and inspection.Comprised of 12 chapters, this book begins with an overview of electrical installation work, traits of a good electrician, and the regulations governing installations. The r

  19. TESLA accelerator installation

    International Nuclear Information System (INIS)

    Neskovic, N.; Ostojic, R.; Susini, A.; Milinkovic, Lj.; Ciric, D.; Dobrosavljevic, A.; Brajuskovic, B.; Cirkovic, S.; Bojovic, B.; Josipovic, M.

    1992-01-01

    The TESLA accelerator Installation is described. Its main parts are the VINCY Cyclotron, the multiply charged heavy-ion mVINIS Ion Source, and the negative light-ion pVINIS Ion Source. The Installation should be the principal installation of a regional center for basic and applied research in nuclear physics, atomic physics, surface physics and solid state physics, for production of radioisotopes, for research and therapy in nuclear medicine. The first extraction of the ion beam from the Cyclotron is planned for 1995. (R.P.) 3 refs.; 1 fig

  20. Planning and installing micro-hydro systems a guide for designers, installers and engineers

    CERN Document Server

    Elliott, Chris

    2014-01-01

    An essential addition to the Earthscan Planning & Installing series, Planning and Installing Micro-Hydro Systems provides vital diagrams, pictures and tables detailing the planning and installing of a micro-hydro system, including information on the maintenance and economics once an installation is running. The book covers subjects such as measuring head and flow, ecological impacts, scheme layouts, practical advice, calculations and turbine choice. Archimedes screws are also covered in detail, as well as the main conventional choices relevant to small sites.Micro-hydro refers to hydropower sy

  1. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    . In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic......Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  2. Installation Art

    DEFF Research Database (Denmark)

    Petersen, Anne Ring

    Despite its large and growing popularity – to say nothing of its near-ubiquity in the world’s art scenes and international exhibitions of contemporary art –installation art remains a form whose artistic vocabulary and conceptual basis have rarely been subjected to thorough critical examination....... In Installation Art: Between Image and Stage, Anne Ring Petersen aims to change that. She begins by exploring how installation art developed into an interdisciplinary genre in the 1960s, and how its intertwining of the visual and the performative has acted as a catalyst for the generation of new artistic...... phenomena. It investigates how it became one of today’s most widely used art forms, increasingly expanding into consumer, popular and urban cultures, where installation’s often spectacular appearance ensures that it meets contemporary demands for sense-provoking and immersive cultural experiences. The main...

  3. The role of installers for thermo-technical installations when buying gas boilers

    Directory of Open Access Journals (Sweden)

    Jovičić Dragoljub

    2013-01-01

    Full Text Available This study presents the research of role installers for thermo-technical installations when buying gas boilers in the Serbian market. Considering the fact that installers are significantly different, they are grouped by specific, relevant characteristics. The research is focused on the evaluation of marketing mix instruments by nine identified segments of installers. Moreover, research has been explored deeper through conclusion installers about the most important and most credible sources of information on gas boilers. During the research were used secondary and primary data sources. Besides the research at the table, field research has been also done by unstructured personal communication. All collected data were analyzed in details and both hypothesis were tested, where one of them is partially confirmed, and another one fully confirm. Given results can be useful for marketers and their anticipation of demand. Also these results can be used for creating optimal marketing strategy in the Serbian market of gas boilers.

  4. Automated installation methods for photovoltaic arrays

    Science.gov (United States)

    Briggs, R.; Daniels, A.; Greenaway, R.; Oster, J., Jr.; Racki, D.; Stoeltzing, R.

    1982-11-01

    Since installation expenses constitute a substantial portion of the cost of a large photovoltaic power system, methods for reduction of these costs were investigated. The installation of the photovoltaic arrays includes all areas, starting with site preparation (i.e., trenching, wiring, drainage, foundation installation, lightning protection, grounding and installation of the panel) and concluding with the termination of the bus at the power conditioner building. To identify the optimum combination of standard installation procedures and automated/mechanized techniques, the installation process was investigated including the equipment and hardware available, the photovoltaic array structure systems and interfaces, and the array field and site characteristics. Preliminary designs of hardware for both the standard installation method, the automated/mechanized method, and a mix of standard installation procedures and mechanized procedures were identified to determine which process effectively reduced installation costs. In addition, costs associated with each type of installation method and with the design, development and fabrication of new installation hardware were generated.

  5. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, Koen

    1988-01-01

    Border installations cover all nuclear plants located near the border with a neighbouring state. However, the actual distance depends on the context. The distance can vary considerably. Also the prohibition on siting near a heavily populated area also defines the actual distance variably. The distance criteria may be modified by other factors of topography, prevailing climate and so on. Various examples which illustrate the problems are given. For example, the Creys-Melville nuclear power plant is 80km from Geneva and the Cattonam installation is 12km from the French border with Luxembourg and Germany. The Cattenom case is explained and the legal position within the European Institutions is discussed. The French licensing procedures for nuclear power stations are described with special reference to the Cattenom power plant. Border installations are discussed in the context of European Community Law and Public International Law. (U.K.)

  6. The principles of protection against fires in nuclear facilities

    International Nuclear Information System (INIS)

    Dupuy, Ph.; Gupta, O.

    2000-01-01

    Because of the presence of fissile or radioactive materials in nuclear facilities, their protection against fires is different from that of classical industrial installations. 3 priorities have been defined, in importance order: 1) maintaining nuclear safety in order to protect public and environment, 2) protection of workers, and 3) limiting the damages on the installation. The prevention of fires is based on 4 rules: 1) limiting as much as possible the quantity of inflammable materials and imposing a strict control of any use of igniting source, 2) assuring a permanent monitoring of the installation by means of reliable devices able to detect any fire starting, 3) designing the sectorization of the installation in order to keep fire in delimited zones and prevent its extension, and 4) enhancing the efficiency of the fire brigade intervention. (A.C.)

  7. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Hayoun, C [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  8. Installation for producing sealed radioactive sources; Installation de fabrication de sources radioactives scellees

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J.; Hayoun, C. [Commissariat a l' Energie Atomique, 91 - Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [French] Cette installation a ete concue et realisee pour effectuer des fabrications de sources scellees d'elements de fission: caesium 137 - strontium 90 - promethium 147 - ruthenium 106 - cerium 144 en particulier. L'installation est composee de cellules etanches et protegees, chacune d'elles etant affectee a une fabrication particuliere. La securite et la surete de fonctionnement de l'ensemble sont parmi les elements principaux qui ont guide l'etude. Le rapport decrit l'installation et plus particulierement l'appareillage utilise ainsi que les divers controles et commandes. Le bilan de fonctionnement apres 6 ans d'exploitation sert de conclusion. (auteurs)

  9. Sizewell 'B' cable installation

    International Nuclear Information System (INIS)

    Gemmell, D.R.

    1992-01-01

    N G Bailey and Co. Ltd., UK were awarded the contract for the procurement, manufacture, works testing, works finishing, supply, delivery, off-loading, storage, installation, site finishing, preservation, setting to work and site testing of the following; the main cable installation throughout the Station including the addition of the Radioactive Waste Building, earthing and lightning protection installation, cable supporting steelwork and carriers and glanding and termination of cables. The cabling installation comprises power distribution, control and instrumentation cabling including all the associated cabling accessories, terminal boxes and similar components. The way that the contract was set-up, awarded and is now being carried out is described. Planning and industrial relations have been key features of the contract. (Author)

  10. Geographical modelling based on spatial differentiation of fire brigade actions: A case study of Brno, Czech Republic

    Directory of Open Access Journals (Sweden)

    Popelínský Jan

    2017-03-01

    Full Text Available The paper analyzes crisis situations solved by The Fire Rescue Service of the South Moravian Region (FRS in the city of Brno during 24 weeks between 7th April 2013 and 20th September 2013. The article deals briefly with all FRS actions and then focuses on fires. The open-access database of FRS is used for analysis. It is accessed from a database of the innovative web application StreetAlert, which allows users to learn about current fire brigade actions in the specified distance from the mobile phone. The data are processed in PostgreSQL and then spatial analysis is performed using the most detailed administrative division of the city – basic settlement units. As this division of urban space is used also in the most recent Czech census (2011, it is possible to use sociodemographic statistical data for comparison. The article identifies spatial regularities in the distribution of fires, describes the structure of the fires in terms of the type of event (fires of waste, fires of grass and forest, fires of buildings, discovers their possible dependence on the specific characteristics of urban space, finds potentially dangerous places (kernel density analysis, draws valid conclusions applicable to similar settlements, and shows the possible use of the data for local government. The main benefit of the research lies in revealing the spatial distribution of the examined phenomena.

  11. 30 CFR 57.4504 - Fan installations.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Fan installations. 57.4504 Section 57.4504... Control Installation/construction/maintenance § 57.4504 Fan installations. (a) Fan houses, fan bulkheads... of combustible materials, except installed wiring, ground and track support, headframes, and direct...

  12. Associations of age, aerobic fitness, and body mass index with injury in an operational Army brigade.

    Science.gov (United States)

    Rappole, Catherine; Grier, Tyson; Anderson, Morgan K; Hauschild, Veronique; Jones, Bruce H

    2017-11-01

    To investigate the effects of age, aerobic fitness, and body mass index (BMI) on injury risk in operational Army soldiers. Retrospective cohort study. Male soldiers from an operational Army brigade were administered electronic surveys regarding personal characteristics, physical fitness, and injuries occurring over the last 12 months. Injury risks were stratified by age, 2-mile run time, and BMI. Analyses included descriptive incidence, a Mantel-Haenszel χ 2 test to determine trends, a multivariable logistic regression to determine factors associated with injury, and a one-way analysis of variance (ANOVA). Forty-seventy percent of 1099 respondents reported at least one injury. A linear trend showed that as age, 2-mile run time, and BMI increased, so did injury risk (p<0.01). When controlling for BMI, the most significant independent injury risk factors were older age (odd ratio (OR) 30years-35years/≤24years=1.25, 95%CI: 1.08-2.32), (OR≥36years/≤24years=2.05, 95%CI: 1.36-3.10), and slow run times (OR≥15.9min/≤13.9min=1.91, 95%CI: 1.28-2.85). An ANOVA showed that both run times and BMI increased with age. The stratified analysis and the multivariable logistic regression suggested that older age and poor aerobic fitness are stronger predictors of injury than BMI. Copyright © 2017 Sports Medicine Australia. All rights reserved.

  13. 3D Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Johansen, Stine Liv; Bach Mikkelsen, Michelle

    2014-01-01

    Three-dimensional projection installations are particular kinds of augmented spaces in which a digital 3-D model is projected onto a physical three-dimensional object, thereby fusing the digital content and the physical object. Based on interaction design research and media studies, this article ...... Fingerplan to Loop City, is a 3-D projection installation presenting the history and future of city planning for the Copenhagen area in Denmark. The installation was presented as part of the 12th Architecture Biennale in Venice in 2010....

  14. Y2K INTERVENTIONS AT CERN

    CERN Multimedia

    Peter Sollander/ST

    1999-01-01

    Although the laboratory will be closed from December 18th to January 3rd, several services will still be running: gates will be manned by the guards, the fire brigade will be ready for interventions and the operators of the technical control room (TCR)will be supervising CERN's technical infrastructure.Despite the thorough Y2K testing performed, remote supervision by the TCR may be unavailable on January 1st. To cope with this situation, the TCR and equipment groups concerned have prepared special Y2K instructions for important installations.Special instructions exist for High Voltage electricity distribution, LEP flood pumps, fire and gas detection, reject water monitoring and for the control system that relays information from the equipment sensors to the TCR and fire brigade.On-call personnel for different technical infrastructure systems will visit CERN on the first of January to verify that their systems are functioning correctly and report on the status in a meeting organised in the TCR during the after...

  15. Risk Factors for Injury Associated with Low, Moderate, and High Mileage Road Marching in a U.S. Army Infantry Brigade

    Science.gov (United States)

    2017-03-24

    and football ) as activities that are commonly associated with injury (Grier et al. 2017; Hauret et al. 2015; Jones and Hauschild 2015). Likewise...temporary emergency loads (Department of the Army 1990). The results of this study support the lowest range of these recommended weights, so reducing the

  16. Evaluation of the Iron Horse Peformance Optimization Physical Training Program (IHPOP) in a Light Infantry Brigade, October 2010-April 2011

    Science.gov (United States)

    2014-06-19

    activities like excessive exercise or running long distances, r epetitive lifting/pulling/pushing objects, or repeatedly pitching a softball . 75... softball . 72. With these definitions in mind, have you had an injury during the past 6 months? If so, how many different times did you have an injury where

  17. Installation of the LHC experimental insertions

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the low-beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  18. INSTALLATION OF THE LHC EXPERIMENTAL INSERTIONS

    CERN Document Server

    Bartolome-Jimenez, S

    2004-01-01

    The installation of the LHC experimental insertions, and particularly the installation of the Low-Beta quadrupoles, raises many technical challenges due to the stringent alignment specifications and to the difficulty of access in very confined areas. The compact layout with many lattice elements, vacuum components, beam control instrumentation and the presence of shielding does not allow for any improvisation in the installation procedure. This paper reviews all the constraints that need to be taken into account when installing the experimental insertions. It describes the chronological sequence of installation and discusses the technical solutions that have been adopted.

  19. Installing Python Modules with pip

    OpenAIRE

    Fred Gibbs

    2013-01-01

    This lesson shows you how to download and install Python modules. There are many ways to install external modules, but for the purposes of this lesson, we’re going to use a program called pip. As of Python 2.7.9 and newer, pip is installed by default. This tutorial will be helpful for anyone using older versions of Python (which are still quite common).

  20. Displacement pile installation effects in sand

    NARCIS (Netherlands)

    Beijer-Lundberg, A.

    2015-01-01

    Installation effects govern the post-installation behaviour of displacement piles in sand. These effects are currently not completely understood. Suitable experimental techniques to model these installation effects include field, laboratory and experimental models. In the current thesis a

  1. New fast reactor installation concept

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The large size and complexity of fast reactor installations are emphasised and these difficulties will be increased with the advent of fast reactors of higher power. In this connection a new concept of fast reactor installation is described with a view to reducing the size of the installation and enabling most components, including even the primary vessel, to be constructed within the confines of a workshop. Full constructional details are given. (U.K.)

  2. DAQ INSTALLATION IN USC COMPLETED

    CERN Multimedia

    A. Racz

    After one year of work at P5 in the underground control rooms (USC55-S1&S2), the DAQ installation in USC55 is completed. The first half of 2006 was dedicated to the DAQ infrastructures installation (private cable trays, rack equipment for a very dense cabling, connection to services i.e. water, power, network). The second half has been spent to install the custom made electronics (FRLs and FMMs) and place all the inter-rack cables/fibers connecting all sub-systems to central DAQ (more details are given in the internal pages). The installation has been carried out by DAQ group members, coming from the hardware and software side as well. The pictures show the very nice team spirit !

  3. Planning of installations in prefabricated buildings

    Directory of Open Access Journals (Sweden)

    Stanojević Ana D.

    2014-01-01

    Full Text Available Planning installations is becoming an increasing problem in construction, because the number of devices for technical supply is constantly increasing with continual progress in science and technology. Since the installations of the building can not be viewed unrelated of the construction, problem of its planning is more complicated in prefabricated buildings because the elements of construction are prefabricated. Planning was formerly performed by embedding the installation in prefabricated elements. This method had a lot of flaws, and modern approach tends setting installation out of prefabricated elements except when the traditional approach proves as economical. Although the hot water heating with radiators is the most practical way of heating in prefabricated buildings, the under floor heating systems have greater and greater use. Today, prefabricated sanitary cabins have a huge use and they are much more economical in comparison to special panels for bathrooms that were once create. Approaches in terms of planning electrical installation are different, but for conventional constructed buildings, as well as prefabricated buildings, the use of lightweight prefabricated walls with embedded installations, today is recommended, when the room is loaded with a large number of this installations and if it is possible.

  4. Electrical installations technology

    CERN Document Server

    Whitfield, J F

    1968-01-01

    Electrical Installations Technology covers the syllabus of the City and Guilds of London Institute course No. 51, the "Electricians B Certificate”. This book is composed of 15 chapters that deal with basic electrical science and electrical installations. The introductory chapters discuss the fundamentals and basic electrical principles, including the concept of mechanics, heat, magnetic fields, electric currents, power, and energy. These chapters also explore the atomic theory of electric current and the electric circuit, conductors, and insulators. The subsequent chapter focuses on the chemis

  5. Flat-plate solar collector - installation package

    Science.gov (United States)

    1978-01-01

    Package includes installation, operation and maintenance manual for collector, analysis of safety hazards, special handling instructions, materials list, installation drawings, and warranty and certification statement. Manual includes instructions for roof preparation and for preparing collector for installation. Several pages are devoted to major and minor repairs.

  6. Safety of nuclear installations in Slovakia

    International Nuclear Information System (INIS)

    1998-01-01

    In this part next aspects are described: (1) Site selection (Legislation related to site selection; Meeting criteria at Bohunice and Mochovce sites; International agreements); (2) Design preparation and construction (Designing and construction-relevant legislation; Nuclear installation project preparation of nuclear installation at Mochovce site); (3) Operation (Operator licensing procedure; Operation limits and conditions; Maintenance testing and control documentation for management and operation; Technical support of operation; Analysis of events at nuclear installations and Radioactive waste production); (4) Planned safety upgrading activities at nuclear installations

  7. Python Introduction and Installation

    Directory of Open Access Journals (Sweden)

    William J. Turkel

    2012-07-01

    Full Text Available This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo Edit, but you can use any text editor capable of working with Python. Here’s a list of other options: Python Editors. Once everything is installed, you will write your first programs, “Hello World” in Python and HTML.

  8. 46 CFR 111.60-5 - Cable installation.

    Science.gov (United States)

    2010-10-01

    ... REQUIREMENTS Wiring Materials and Methods § 111.60-5 Cable installation. (a) Each cable installation must meet... 46 Shipping 4 2010-10-01 2010-10-01 false Cable installation. 111.60-5 Section 111.60-5 Shipping... incorporated by reference; see 46 CFR 110.10-1), including clause 8. (b) Each cable installation made in...

  9. Performance of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters : characterizing the soil structure interaction developed in a buried pipe installation located under : roads/highways. The drainage pipes or culverts instal...

  10. The Military Route of 24 th Infantry Division within the Troops of North-Western, Western and Northern Fronts. 1914–1917

    Directory of Open Access Journals (Sweden)

    Mikhaylov Andrey

    2014-11-01

    Full Text Available The article presents the operational record of 24th infantry division during the First World War within the troops of three fronts (North-Western, Northern and Western. This division was formed in 1863, and in 1892-1895 three of its four regiments were located in Pskov, an old city in the North-West of Russia. The officer staff (their social origin and education by the eve of the First World War as well as the mobilization course at the beginning of the War have been reviewed in the article. On the example of one military unit, typical of the Russian Army, the author analyzes the peculiar features of military operations during the First World War and the role of the division’s participation in several major operations in 1914-1917. They include the Russian Army’s dramatic offensive in East Prussia (summer and autumn 1914, the defensive fighting on the Ravca river (in the beginning of 1915, the offensive of the Russian army in Galicia in 1916 (known as Brusilov Offensive. The article has been finished with the story about the division’s way during the Russian Army’s disintegration in the period of the revolution of 1917. The article is based on the unpublished documents from Russian Military and Historic Archive (Moscow as well as on the press materials.

  11. Professional operation and management of nuclear island installation

    International Nuclear Information System (INIS)

    Ma Limin

    2011-01-01

    As an important part of nuclear power plant construction, nuclear island installation mainly involves main equipment installation, pipeline installation, associated procedure examination and other important tasks. However, due to the nuclear island installation management changing from single project to multi-projects, the problems such as professional management of nuclear island installation and the lack of technical staff become more and more prominent and become one of the key restricts to the work of nuclear island installation. Based on analysis of the single project, single-base nuclear island installation management and practice, combined with the current situation that multi-project and multi-base construction of nuclear power are carrying out at the same time, this paper proposes a new management model of nuclear island installation. (author)

  12. Planning and installing photovoltaic systems a guide for installers, architects and engineers

    CERN Document Server

    Deutsche Gesellschaft für Sonnenenergie (DGS)

    2013-01-01

    New third edition of the bestselling manual from the German Solar Energy Society (DGS), showing you the essential steps to plan and install a solar photovoltaic system. With a global focus, it has been updated to include sections on new technology and concepts, new legislation and the current PV market.Updates cover:new developments in inverter and module technologymarket situation worldwide and outlookintegration to the grid (voltage stabilization, frequency, remote control)new legal requirements for installation and planningoperational costs for dismantling and recyclingfeed-in managementnew requirements for fire protectionnew requirements in Europe for electric waste (Waste Electrical and Electronic Equipment, WEEE) and the restriction of the use of certain hazardous substances (RoHS).Also providing information on current developments in system design, economic analysis, operation and maintenance of PV systems, as well as new software tools, hybrid and tracking systems.An essential manual for installers, e...

  13. A General Purpose High Performance Linux Installation Infrastructure

    International Nuclear Information System (INIS)

    Wachsmann, Alf

    2002-01-01

    With more and more and larger and larger Linux clusters, the question arises how to install them. This paper addresses this question by proposing a solution using only standard software components. This installation infrastructure scales well for a large number of nodes. It is also usable for installing desktop machines or diskless Linux clients, thus, is not designed for cluster installations in particular but is, nevertheless, highly performant. The infrastructure proposed uses PXE as the network boot component on the nodes. It uses DHCP and TFTP servers to get IP addresses and a bootloader to all nodes. It then uses kickstart to install Red Hat Linux over NFS. We have implemented this installation infrastructure at SLAC with our given server hardware and installed a 256 node cluster in 30 minutes. This paper presents the measurements from this installation and discusses the bottlenecks in our installation

  14. Buckling of Bucket Foundations During Installation

    DEFF Research Database (Denmark)

    Madsen, Søren

    There is a great politically will to expand the green energy market in these times. A proven green technology is wind turbines. Wind turbines have been installed in great numbers on land over the last decades. However, the current development in wind turbine design leads to larger turbine sizes...... in order to reduce the cost of energy. This limits the on land application due to transportation limitations and unwillingness from prospect neighbours. Thus, offshore wind energy started developing over the last couple of years. Although installing the wind turbines offshore resolves the before men tioned...... issues, it brings up the cost of energy mainly due to increased installation and maintenance costs. A very large part—up to 30–50% using current technology—of the installation cost origins from the expenses related to the installation of foundations. A new foundation concept—the bucket foundation...

  15. Use a defibrillator, save a life

    CERN Multimedia

    Joannah Caborn Wengler

    2012-01-01

    With the work for Long Shutdown 1 looming on the horizon, the CERN Fire Brigade is anticipating a heavy workload: more people working at CERN means more call-outs. So the more trained first-aiders around to help out before the paramedics arrive, the better. Would you know what to do in a medical emergency?   It could happen at any time: two colleagues are having a coffee at work, when one suddenly clutches his or her chest and falls to the floor unconscious. What would you do? Run to find a first-aider? Call the ambulance and wait, finishing your coffee? Neither response is entirely correct. On Monday 11 June in Building 40 the CMS safety group, in collaboration with the Fire Brigade and the Medical Service, demonstrated the recommended, potentially life-saving response to cardiac arrest (see the video), including the correct use of a defibrillator, ten of which were recently installed in key CERN locations (the Bulletin reported).     “In countries where...

  16. Current status and installation of dental PACS

    International Nuclear Information System (INIS)

    Park, Chang Seo; Kim, Kee Deog; Park, Hyok; Jeong, Ho Gul

    2004-01-01

    Picture Archiving and Communication System (PACS) is difficult to implement in the best of situations, but evidence is growing that the benefits are significant. The aims of this study are to analyze the current status of full PACS and establish successful installation standard of dental PACS. Materials and Methods were based on the investigation of current working status and installation standard of PACS, and observation of variable issues to installation of dental PACS. By September 30, 2004, full PACS implementations in their facilities were 88.1% in specialized general hospitals (37 installations out of total 42 hospitals), 59.8% in general hospitals (144 installations out of total 241 hospitals), 12.3% in medical hospitals (116 installations out of total 941 hospitals) and 3.6% in dental hospitals (4 installations out of total 110 hospitals). Only 4 university dental hospitals currently have installed and are operating full PACS. Major obstacle to wide spread of dental PACS is initial high investments. Clinical environments of dental PACS differed from medical situation. Because of characteristic dental practice, the initial investments for dental PACS are generally much greater than those of medical PACS. Also new economic crisis makes users scruple. The best way to overcome these limitations is to establish an economic installation standard for dental PACS. Also the clear technical communication between the customer and the supplier before both sides are committed to the obstacles are critical to its success.

  17. Does drywall installers' innovative idea reduce the ergonomic exposures of ceiling installation: A field case study.

    Science.gov (United States)

    Dasgupta, Priyadarshini Sengupta; Punnett, Laura; Moir, Susan; Kuhn, Sarah; Buchholz, Bryan

    2016-07-01

    The study was conducted to assess an intervention suggested by the workers to reduce the physical or ergonomic exposures of the drywall installation task. The drywall installers were asked to brainstorm on innovative ideas that could reduce their ergonomic exposures during the drywall installation work. The workers proposed the idea of using a 'deadman' (narrow panel piece) to hold the panels to the ceiling while installing them. The researcher collected quantitative exposure data (PATH, 3DSSPP) at the baseline and intervention phases and compared the phases to find out any change in the exposure while using the 'deadman'. Results showed that ergonomic exposures (such as overhead arm and awkward trunk postures and heavy load handling) were reduced at the intervention phase while using the 'deadman' with an electrically operated lift. The concept of the 'deadman', which was shown to help reduce musculoskeletal exposures during ceiling installation, can be used to fabricate a permanent ergonomic tool to support the ceiling drywall panel. Copyright © 2016 Elsevier Ltd and The Ergonomics Society. All rights reserved.

  18. Installations solaires photovoltaïques

    CERN Document Server

    2014-01-01

    Cet ouvrage présente les règles de conception et de mise en œuvre des installations photovoltaïques raccordées au réseau public de distribution à basse tension. Il s’applique aux bâtiments neufs et existants et concerne non seulement les petites installations résidentielles, d’une puissance de l’ordre de quelques kWc, mais aussi celles des bâtiments collectifs, tertiaires ou agricoles. Il traite successivement : - des fondamentaux de l'énergie solaire photovoltaïque (gisement solaire, principe de la conversion, composants d'une installation...) ; - du dimensionnement de l'installation (choix des matériels, règles de conception, estimation de l'énergie récupérable...) ; - de sa mise en oeuvre (travail en hauteur, habilitation électrique, mise en service, maintenance...) ; - des démarches administratives nécessaires (aides financières, accès au réseau de distribution, vente de l'électricité produite...).

  19. Solar Installation Labor Market Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Friedman, B.; Jordan, P.; Carrese, J.

    2011-12-01

    The potential economic benefits of the growing renewable energy sector have led to increased federal, state, and local investments in solar industries, including federal grants for expanded workforce training for U.S. solar installers. However, there remain gaps in the data required to understand the size and composition of the workforce needed to meet the demand for solar power. Through primary research on the U.S. solar installation employer base, this report seeks to address that gap, improving policymakers and other solar stakeholders understanding of both the evolving needs of these employers and the economic opportunity associated with solar market development. Included are labor market data covering current U.S. employment, expected industry growth, and employer skill preferences for solar installation-related occupations. This study offers an in-depth look at the solar installation sectors. A study published by the Solar Foundation in October 2011 provides a census of labor data across the entire solar value chain.

  20. 46 CFR 58.10-5 - Gasoline engine installations.

    Science.gov (United States)

    2010-10-01

    ... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-5 Gasoline engine installations. (a) Engine design. All installations shall be of marine type engines suitable for the intended... of such protection. (d) Exhaust pipe. (1) Exhaust pipe installations must conform to the requirements...

  1. Installation for analytic chemistry under irradiation; Installation de chimie analytique sous rayonnement

    Energy Technology Data Exchange (ETDEWEB)

    Fradin, J; Azoeuf, P; Guillon, A [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1966-07-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [French] L'installation a ete realisee pour effectuer des manipulations et des analyses chimiques sur des produits radioactifs. Elle est totalement telecommandee et se presente sous une forme lineaire de 15 metres de longueur et comporte trois zones: - une zone active d'appareillage, - une zone arriere d'intervention, - une zone avant independante des deux premieres et totalement protegee, ou s'operent les telecommandes de l'appareillage. L'ensemble a ete concu de facon a ce que chaque appareillage correspondant a une technique d'analyse soit implante dans une enceinte etanche. Les enceintes etanches sont reliees entre elles par un convoyeur. Apres trois annees de fonctionnement nous faisons le bilan et les critiques de l'installation. (auteurs)

  2. Nuclear installations

    International Nuclear Information System (INIS)

    1998-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  3. Nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the fulfilling of the Brazilian obligations under the Convention on Nuclear Safety. The Chapter 2 of the document contains some details about the existing Brazilian nuclear installations. Also, safety improvements at Angra 1 and aspects of Angra 2 and 3 are reported

  4. Competent person for radiation protection. Practical radiation protection for base nuclear installations and installations classified for the environment protection

    International Nuclear Information System (INIS)

    Pin, A.; Perez, S.; Videcoq, J.; Ammerich, M.

    2008-01-01

    This book corresponds to the practical module devoted to the base nuclear installations and to the installations classified for the environment protection, that is to say the permanent nuclear installations susceptible to present risks for the public, environment or workers. Complied with the legislation that stipulates this module must allow to apply the acquired theoretical training to practical situations of work, it includes seven chapters as follow: generalities on access conditions in regulated areas of nuclear installation,s or installations classified for environment protection and clothing against contamination; use of control devices and management of damaged situations; methodology of working place studies, completed by the application to a real case of a study on an intervention on a containment wall; a part entitled 'take stock of the situation' ends every chapter and proposes to the reader to check its understanding and acquisition of treated knowledge. (N.C.)

  5. 24 CFR 3280.709 - Installation of appliances.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Installation of appliances. 3280... Fuel Burning Systems § 3280.709 Installation of appliances. (a) The installation of each appliance... the manufacturer's instructions attached to the appliance. Every appliance shall be secured in place...

  6. 14 CFR 171.159 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ... Installation requirements. (a) The facility must be installed according to accepted good engineering practices... must have a reliable source of suitable primary power, either from a power distribution system or...

  7. Successful pipeline installation for Parque das Conchas development; Subsea installation

    Energy Technology Data Exchange (ETDEWEB)

    Bartz, Cesar

    2010-07-01

    Subsea 7 has successfully delivered again in Brazilian deep-waters. The subsea engineering and construction company has recently completed pipeline installation activities for the Parque das Conchas (BC-10) development, offshore Brazil. (AG)

  8. 24 CFR 3286.203 - Installation license required.

    Science.gov (United States)

    2010-04-01

    ... performance of the installation work in compliance with the requirements of this part. (3) A license is not required for individuals working as direct employees of a licensed installer or for the company that... and competent performance of all employees working under the licensed installer's supervision and for...

  9. 46 CFR 181.520 - Installation and location.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation and location. 181.520 Section 181.520... TONS) FIRE PROTECTION EQUIPMENT Portable Fire Extinguishers § 181.520 Installation and location... the space being protected. The installation and location must be to the satisfaction of the Officer in...

  10. BROOKHAVEN: RHIC installation

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This summer, the first superconducting magnet was installed in 3.8 kilometre tunnel for Brookhaven's RHIC heavy ion collider (October, page 31). Manufactured by Northrop Grumman's Electronics and System Integration Division, the magnet is the first of RHIC's 373 dipoles. In addition to the dipoles, Northrop Grumman will also provide 432 RHIC quadrupoles. The first quadrupole was delivered on 8 April, a month before the first dipole arrived for onsite testing prior to installation. RHIC will need 1,700 superconducting magnets - dipoles, quadrupoles, sextupoles and correcting magnets, 1,200 of which will be built by industry and the rest built at Brookhaven. The 300 sextupoles are being supplied by Everson Electric

  11. 46 CFR 58.10-10 - Diesel engine installations.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 2 2010-10-01 2010-10-01 false Diesel engine installations. 58.10-10 Section 58.10-10... MACHINERY AND RELATED SYSTEMS Internal Combustion Engine Installations § 58.10-10 Diesel engine installations. (a) The requirements of § 58.10-5 (a), (c), and (d) shall apply to diesel engine installations...

  12. 32 CFR 634.25 - Installation traffic codes.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Installation traffic codes. 634.25 Section 634.25 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY (CONTINUED) LAW ENFORCEMENT AND CRIMINAL INVESTIGATIONS MOTOR VEHICLE TRAFFIC SUPERVISION Traffic Supervision § 634.25 Installation traffic codes. (a) Installation or activit...

  13. Fire protection programme during construction of the Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Mian Umer, M.

    1998-01-01

    A clear view is given of several measures that have been taken with regard to fire prevention, protection and fire fighting during all phases of the construction, installation and commissioning of the Chasma nuclear power plant to protect personnel and equipment so that any delays in plant operation as a result of fire incident can be avoided. These measures include the precautions taken, the provisions made for fire extinguishers and hydrants, and the setting up of a fire brigade. An overview is also given of the fire incidents that have occurred. (author)

  14. Modern electrical installation for craft students

    CERN Document Server

    Scaddan, Brian

    2013-01-01

    Modern Electrical Installation for Craft Students, Volume 2, Third Edition discusses several topics concerning electrical installations. The book is comprised of eight chapters that deal with craft theory, associated subjects, and electrical industries. Chapter 1 covers inductors and inductance, while Chapter 2 tackles capacitors and capacitance. Chapter 3 deals with inductance and capacitance in installation work. The book also discusses cells, batteries, and transformers. The electrical industries, control and earthing, and testing are also dealt with. The last chapter discusses the basic el

  15. A novel method for coiled tubing installation

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, Peter J. [2H Offshore, Houston, TX (United States); Tibbetts, David [Aquactic Engineering and Construction Ltd., Aberdeen (United Kingdom)

    2009-12-19

    Installation of flexible pipe for offshore developments is costly due to the physical cost of the flexible pipe, expensive day rates and the availability of suitable installation vessels. Considering the scarcity of flexible pipe in today's increasingly demanding and busy market, operators are seeking a cost effective solution for installing piping in a range of water depths using vessels which are readily on hand. This paper describes a novel approach to installing reeled coiled tubing, from 1 inch to 5 inch diameter, from the back of a small vessel in water depths from 40 m up to around 1000 m. The uniqueness of the system is the fact that the equipment design is modular and compact. This means that when disassembled, it fits into standard 40 ft shipping containers, and the size allows it to be installed on even relatively small vessels of opportunity, such as anchor handling or installation vessels, from smaller, and cheaper quay side locations. Such an approach is the ideal solution to the problem faced by operators, in that it allows the installation of cheaper, readily available coiled tubing, from cost-effective vessels, which do not need to transit to a pick up the system. (author)

  16. Towards a Framework for Projection Installations

    DEFF Research Database (Denmark)

    Halskov, Kim; Falck, Hans William

    2013-01-01

    Projection installations are part of Spatially Augmented Reality, where the projection medium is used to enrich a fixed, bounded physical space with digital content. Projection technology enables us to turn many kinds of physical objects into displays. In this paper we develop and present...... a conceptual framework that addresses three aspects of a projection installation: the contentassociated with the object, the digital content, and the relation between the two. We conclude the paper with a set of strategies commonly used in projection installations: Enhancing or emphasizing physical aspects......; Transforming materiality; Adding virtual objects; 3D effects; Complex content on simple objects or simple content on complex; Strong versus loose connections between the physical object and the digital content. This paper is based on four cases, two of which concern cultural heritage installations, the others...

  17. Lean Office em organizações militares de saúde: estudo de caso do Posto Médico da Guarnição Militar de Campinas Lean Office in health military organizations: case study in the health center of Campinas

    Directory of Open Access Journals (Sweden)

    Everton Cesar Seraphim

    2010-01-01

    Full Text Available O presente artigo apresenta uma aplicação dos conceitos de escritório enxuto no nível institucional na área da prestação de serviços, particularmente no segmento de saúde. Dessa forma será apresentado o caso do posto médico militar da guarnição de Campinas, estado de São Paulo, o qual é subordinado ao Comando da 11ª Brigada de Infantaria Leve. Para tanto será mostrado inicialmente um panorama da organização e sua situação gerencial, destacando-se os conflitos existentes. Na sequência será vista a metodologia de Lean Office (Escritório Enxuto aplicada à solução dos problemas e os resultados obtidos.This article presents an aplication of the concepts of lean office at the institutional level in the area of services, particularly in the segment of health. Thus, the case study is the Military Treatment Facility in Campinas, state of São Paulo, which is subordinate to the Command of 11th Light Infantry Brigade. Firstly, an organizational and managerial chart is presented highlighting the existing conflicts. Next, the lean office methodology applied to the solution of those problems and the results obtained are presented.

  18. Python Introduction and Installation

    OpenAIRE

    William J. Turkel; Adam Crymble

    2012-01-01

    This first lesson in our section on dealing with Online Sources is designed to get you and your computer set up to start programming. We will focus on installing the relevant software – all free and reputable – and finally we will help you to get your toes wet with some simple programming that provides immediate results. In this opening module you will install the Python programming language, the Beautiful Soup HTML/XML parser, and a text editor. Screencaps provided here come from Komodo ...

  19. Lietojumprogrammu instalāciju izveides risinājumi

    OpenAIRE

    Zālītis, Mārtiņš

    2010-01-01

    Bakalaura darbā „Lietojumprogrammu instalāciju izveides risinājumi” mērķis ir izanalizēt lietotājam draudzīgas un nedraudzīgas instalācijas, kā arī salīdzināt instalāciju veidošanas rīkus, norādot uz to stiprajām un vājajām pusēm. Lai izpētītu instalāciju izveides iespējas tiek izmantota tīmeklī pieejamā informācija, autora darbs ar instalāciju rīkiem un to novērtējums. Parādīta sarežģītas instalācijas uzbūve, kas izveidota ar NSIS instalāciju rīku, kuru arī autors atzīst par labāko risinājum...

  20. On-Demand Interactive Simulation-Centered Training for Small Unit Tactics

    National Research Council Canada - National Science Library

    Munro, Allen

    2003-01-01

    Training on small unit infantry tactics in both the context of present-day infantry operations and in Objective Force Warrior contexts may benefit from the use of interactive graphics with behavioral...

  1. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  2. Importance of human factors on nuclear installations safety

    International Nuclear Information System (INIS)

    Caruso, G.J.

    1990-01-01

    Actually, installations safety and, in particular the nuclear installations infer a strong incidence in human factors related to the design and operation of such installations. In general, the experience aims to that the most important accidents have happened as result of the components' failures combination and human failures in the operation of safety systems. Human factors in the nuclear installations may be divided into two areas: economy and human reliability. Human factors treatments for the safety evaluation of the nuclear installations allow to diagnose the weak points of man-machine interaction. (Author) [es

  3. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel.Pho...

  4. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. Th...

  5. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. The first installation phase will continue until mid-April. In addition to the magnets, a beam dump facility also has to be installed. The second installation phase will take place later this year and should be completed in 2004, when the TI 8 transfer line is due to be tested. The second transfer line, in tunnel TI 2, should be ready in April 2007, once the LHC magnets have been transported through the downstream section of this tunnel. We...

  6. Performance evaluation of buried pipe installation.

    Science.gov (United States)

    2010-05-01

    The purpose of this study is to determine the effects of geometric and mechanical parameters characterizing the soil structure interaction developed in a buried pipe installation located under roads/highways. The drainage pipes or culverts installed ...

  7. Fuel followed control rod installation at AFRRI

    International Nuclear Information System (INIS)

    Moore, Mark; Owens, Chris; Forsbacka, Matt

    1992-01-01

    Fuel Followed Control Rods (FFCRs) were installed at the Armed Forces Radiobiology Research Institute's 1 MW TRIGA Reactor. The procedures for obtaining, shipping, and installing the FFCRs is described. As part of the FFCR installation, the transient rod drive was relocated. Core performance due to the addition of the fuel followed control rods is discussed. (author)

  8. The insurance of nuclear installations

    International Nuclear Information System (INIS)

    Francis, H.W.

    1977-01-01

    A brief account is given of the development of nuclear insurance. The subject is dealt with under the following headings: the need for nuclear insurance, nuclear insurance pools, international co-operation, nuclear installations which may be insured, international conventions relating to the liability of operators of nuclear installations, classes of nuclear insurance, nuclear reactor hazards and their assessment, future developments. (U.K.)

  9. VERA 3.5 Installation Guide

    Energy Technology Data Exchange (ETDEWEB)

    Bartlett, Roscoe A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Baird, Mark L. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Berrill, Mark A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kulesza, Joel A. [Univ. of Michigan, Ann Arbor, MI (United States); Mervin, Brenden T. [Electric Power Research Inst. (EPRI), Charlotte, NC (United States)

    2016-08-16

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  10. VERA 3.5 Installation Guide

    International Nuclear Information System (INIS)

    Bartlett, Roscoe A.; Baird, Mark L.; Berrill, Mark A.; Kulesza, Joel A.; Mervin, Brenden T.

    2016-01-01

    This guide describes the structure and setup of the standard VERA development environment (VERA Dev Env) and standard VERA Third Party Libraries (TPLs) that need to be in place before installing many of the VERA simulation components. It describes everything from the initial setup on a new machine to the final build, testing, and installation of VERA components. The goal of this document is to describe how to create the directories and contents outlined in Standard VERA Dev Env Directory Structure and then obtain the remaining VERA source and build, test, and install any of the necessary VERA components on a given system. This document describes the process both for a development version of VERA and for a released tarball of the VERA sources.

  11. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  12. Seismic studies for nuclear installations sites

    International Nuclear Information System (INIS)

    Mohammadioun, B.; Faure, J.

    1988-01-01

    The french experience in seismic risks assessment for french nuclear installations permits to set out the objectives, the phases the geographic extensions of workings to be realized for the installation safety. The data to be collected for the safety analysis are specified, they concern the regional seismotectonics, the essential seismic data for determining the seism level to be taken into account and defining the soil movement spectra adapted to the site. It is necessary to follow up the seismic surveillance during the installation construction and life. 7 refs. (F.M.)

  13. Installation for producing sealed radioactive sources

    International Nuclear Information System (INIS)

    Fradin, J.; Hayoun, C.

    1969-01-01

    This installation has been designed and built for producing sealed sources of fission elements: caesium 137, strontium 90, promethium 147, ruthenium 106 and cerium 144 in particular. The installation consists of sealed and protected cells, each being assigned to a particular production. The safety and the operational reliability of the equipment are the principal considerations which have governed this work. The report describes the installation and, in particular, the apparatus used as well as the various control devices. In conclusion, a review as presented of six years operation. (authors) [fr

  14. Biggest semiconductor installed

    CERN Multimedia

    2008-01-01

    Scientists and technicians at the European Laboratory for Particle Physics, commonly known by its French acronym CERN (Centre Europen pour la Recherche Nuclaire), have completed the installation of the largest semiconductor silicon detector.

  15. First ALICE detectors installed!

    CERN Multimedia

    2006-01-01

    Detectors to track down penetrating muon particles are the first to be placed in their final position in the ALICE cavern. The Alice muon spectrometer: in the foreground the trigger chamber is positioned in front of the muon wall, with the dipole magnet in the background. After the impressive transport of its dipole magnet, ALICE has begun to fill the spectrometer with detectors. In mid-July, the ALICE muon spectrometer team achieved important milestones with the installation of the trigger and the tracking chambers of the muon spectrometer. They are the first detectors to be installed in their final position in the cavern. All of the eight half planes of the RPCs (resistive plate chambers) have been installed in their final position behind the muon filter. The role of the trigger detector is to select events containing a muon pair coming, for instance, from the decay of J/ or Y resonances. The selection is made on the transverse momentum of the two individual muons. The internal parts of the RPCs, made o...

  16. 49 CFR 393.30 - Battery installation.

    Science.gov (United States)

    2010-10-01

    ... NECESSARY FOR SAFE OPERATION Lamps, Reflective Devices, and Electrical Wiring § 393.30 Battery installation... 49 Transportation 5 2010-10-01 2010-10-01 false Battery installation. 393.30 Section 393.30 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL MOTOR CARRIER SAFETY...

  17. Demographic characteristics of nuclear installations sites

    International Nuclear Information System (INIS)

    Doumenc, A.; Faure, J.

    1988-01-01

    The selection of a nuclear installations sites can not be conceived without a deep analysis of demographic context. This analysis permits to define the critical populations around the installation and is an essential element of emergency plans. 1 tab., 2 refs. (F.M.)

  18. The safety of nuclear installations

    International Nuclear Information System (INIS)

    1993-01-01

    This Safety Fundamental publication sets out basic objectives, concepts and principles for ensuring safety that can be used both by the IAEA in its international assistance operations and by Member States in their national nuclear programmes. These Safety Fundamentals apply primarily to those nuclear installations in which the stored energy developed in certain situations could potentially results in the release of radioactive material from its designated location with the consequent risk of radiation exposure of people. These principles are applicable to a broad range of nuclear installations, but their detailed application will depend on the particular technology and the risks posed by it. In addition to nuclear power plants, such installations may include: research reactors and facilities, fuel enrichment, manufacturing and reprocessing plants; and certain facilities for radioactive waste treatment and storage

  19. Logistics of LEP installation

    International Nuclear Information System (INIS)

    Genier, C.; Capper, S.

    1988-01-01

    The size of the LEP project, coupled with the tight construction schedules, calls for organized planning, logistics, monitoring and control. This is being carried out at present using tools such as ORACLE the Relational Database Management System, running on a VAX cluster for data storage and transfer, micro-computers for on-site follow-up, and PC's running Professional ORACLE, DOS and XENIX linked to a communications network to receive data feedback concerning transport and handling means. Following over 2 years of installations, this paper presents the methods used for the logistics of installation and their results

  20. Nuclear installations and their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October 15, 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (authors)

  1. Suitcase to Audit Solar Installations

    Energy Technology Data Exchange (ETDEWEB)

    Alberdi, J.; Barcala, J.M.; Blas de, J.; Molinero, A.; Navarrete, J.J.; Yuste, C.

    2001-07-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  2. Suitcase to Audit Solar Installations

    International Nuclear Information System (INIS)

    Alberdi, J.; Barcala, J. M.; Blas, J. de; Molinero, A.; Navarrete, J. J.; Yuste, C.

    2001-01-01

    The audit suitcase was proposed by BESEL to introduce in the solar energy market a new tool which can make an evaluation of solar installation efficiency. Non-invasive sensors and low power components permit both easy installation of the devices and data storage for a period as long as ten days. This project was funded by the contract JOR3-CT98-7030 of the European Union JOULE III program. (Author)

  3. Improving Energy Security for Air Force Installations

    Science.gov (United States)

    Schill, David

    Like civilian infrastructure, Air Force installations are dependent on electrical energy for daily operations. Energy shortages translate to decreased productivity, higher costs, and increased health risks. But for the United States military, energy shortages have the potential to become national security risks. Over ninety-five percent of the electrical energy used by the Air Force is supplied by the domestic grid, which is susceptible to shortages and disruptions. Many Air Force operations require a continuous source of energy, and while the Air Force has historically established redundant supplies of electrical energy, these back-ups are designed for short-term outages and may not provide sufficient supply for a longer, sustained power outage. Furthermore, it is the goal of the Department of Defense to produce or procure 25 percent of its facility energy from renewable sources by fiscal year 2025. In a government budget environment where decision makers are required to provide more capability with less money, it is becoming increasingly important for informed decisions regarding which energy supply options bear the most benefit for an installation. The analysis begins by exploring the field of energy supply options available to an Air Force installation. The supply options are assessed according to their ability to provide continuous and reliable energy, their applicability to unique requirements of Air Force installations, and their costs. Various methods of calculating energy usage by an installation are also addressed. The next step of this research develops a methodology and tool which assesses how an installation responds to various power outage scenarios. Lastly, various energy supply options are applied to the tool, and the results are reported in terms of cost and loss of installation capability. This approach will allow installation commanders and energy managers the ability to evaluate the cost and effectiveness of various energy investment options.

  4. Development regulation regarding with licensing of nuclear installation

    International Nuclear Information System (INIS)

    Bambang Riyono; Yudi Pramono; Dahlia Cakrawati Sinaga

    2011-01-01

    Provisions of Article 17 paragraph (3) of Law Number 10 Year 1997 on Nuclear cleary mandates for the establishment of government regulations (GR) on Nuclear licensing containing the requirements and procedure, both from the standpoint of their utilization and installation. To use has been rising GR No.29 Year 2008 on the Use of Ionizing Radiation Sources and Nuclear Materials, while for the installation has been published PP No.43 Year 2006 on Nuclear Reactor Licensing, and BAPETEN Chairman Decree No.3 Year 2006 on Non-reactor Nuclear Installation Licensing. Based on the background of the preparation of both the aforementioned are just regulate the reactor and utilization, not yet fully meet the mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear, including other nuclear installations. For these reasons, it initiated the need for a separate regulation containing provisions concerning licensing of non-reactor nuclear installations. On the other side from the understanding the legal aspects and interpretations of the Law No.10 of 2004 on the Establishment Regulation Legislation, should be in single mandate of Article 17 paragraph (3) of Law No.10 of 1997 on Nuclear would only produce one of the requirements and procedure for the use or installation, or a maximum of two (2) GR related licensing the use and installation. This is encourages conducted the assessing or studies related to how possible it is according to the legal aspect is justified to combine in one Nuclear licensing regulations regarding both the use and installation, by looking at the complexity of installation and wide scope of utilization of nuclear energy in Indonesia. The results of this paper is expected to provide input in the preparation of GR on licensing of nuclear installations. (author)

  5. Decommissioning and dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Pelzer, N.

    1993-01-01

    The German law governing decommissioning and dismantling of nuclear installations can be called to be embryonic as compared to other areas of the nuclear regulatory system, and this is why the AIDN/INLA regional meeting organised by the German national committee in July 1992 in Schwerin has been intended to elaborate an assessment of the current legal situation and on this basis establish proposals for enhancement and development, taking into account the experience reported by experts from abroad. The proceedings comprise the paper of the opening session, 'Engineering and safety aspects of the decommissioning of nuclear installations', and the papers and discussions of the technical sessions entitled: - Comparative assessment of the regulatory regimes. - Legislation governing the decommissioning of nuclear installations in Germany. - Analysis of the purpose and law making substance of existing regulatory provisions for the decommissioning of nuclear installations. All seventeen papers of the meeting have been prepared for separate retrieval from the database. (orig./HSCH) [de

  6. Culture safety in the nuclear installation

    International Nuclear Information System (INIS)

    Benar Bukit

    2008-01-01

    Culture safety is aimed to empower all the personnel to contribute and responsible to the installation safety where they work in. Culture safety is important as there were so many accidents happened due to the little attention given to the safety, take as examples of what happened in Three Mille Island installation (1979) and Chernobyl (1986). These remind us that human factor gives a significant contribution to the failure of operational system which influences the safety. Therefore, as one of institutions which has nuclear installation. National Nuclear Energy Agency must apply the culture safety to guarantee the safety operation of nuclear installation to protect the personnel, community and environment from the hazard of radioactive radiation. Culture safety has two main components. The first component under the management responsibility is a framework needed in an organisation. The second component is the personnel attitude in al/ levels to respond and optimize those framework. (author)

  7. Notes on LED Installations in Street Illumination

    Directory of Open Access Journals (Sweden)

    Elisabeta Spunei

    2014-09-01

    Full Text Available The paper presents a study made on choosing LED street lighting installations, such that the quality requirements for exterior artificial lighting are fulfilled. We analyze two types of LED street lighting installations from a technical point of view, together with lighting level and brightness values obtained during the measurements. Following on the field measurements, the lighting quality parameters are calculated, and, for the lighting installation with the best performance, optimal mounting suggestions are made. The optimal quality parameters are calculated by simulations using the Dialux software. The same software and the same light sources we also compute an optimal street lighting by determining the size of the installation that provides the best lighting parameter values.

  8. Civilian protection and Britain's commercial nuclear installations

    International Nuclear Information System (INIS)

    1981-01-01

    The subject is treated as follows: initial conclusions (major nuclear attack on military installations; nuclear attack including civil nuclear targets; conventional attack on civil nuclear installations); nature of nuclear weapons explosions and power reactor releases (general; dose effects and biologically significant isotopes; nuclear weapon effects; effect of reactors and other fuel-cycle installations in a thermonuclear area; implications of reactor releases due to conventional attack, sabotage, civil disorder or major accident). (U.K.)

  9. 14 CFR 25.1703 - Function and installation: EWIS.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Function and installation: EWIS. 25.1703... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Electrical Wiring Interconnection Systems (EWIS) § 25.1703 Function and installation: EWIS. (a) Each EWIS component installed in any area of the...

  10. Offshore Cable Installation - Lillgrund. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Unosson, Oscar [Vattenfall Vindkraft AB, Stockholm (Sweden)

    2009-01-15

    This report describes the installation method and the experiences gained during the installation of the submarine cables for the offshore wind farm at Lillgrund. The wind farm consists of 48 wind turbines and is expected to produce 0.33 TWh annually. Different aspects of the installation, such as techniques, co-operation between the installation teams, weather conditions and regulatory and environmental issues are described in this report. In addition, recommendations and guidelines are provided, which hopefully can be utilised in future offshore wind projects. The trenches, in which the submarine cables were laid, were excavated weeks before the cable laying. This installation technique proved to be successful for the laying of the inter array cables. The export cable, however, was laid into position with difficulty. The main reason why the laying of the export cable proved more challenging was due to practical difficulties connected with the barge entrusted with the cable laying, Nautilus Maxi. The barge ran aground a number of times and it had difficulties with the thrusters, which made it impossible to manoeuvre. When laying the inter array cables, the method specification was closely followed, and the laying of the cables was executed successfully. The knowledge and experience gained from the offshore cable installation in Lillgrund is essential when writing technical specifications for new wind plant projects. It is recommended to avoid offshore cable installation work in winter seasons. That will lower the chances of dealing with bad weather and, in turn, will reduce the risks

  11. Survey of Injuries and Injury Risk Factors in the 2nd Brigade Combat Team, 3rd Infantry Division, November 2014 - January 2015

    Science.gov (United States)

    2017-07-10

    physical training programs, health behaviors, and perceptions of leadership and medical support related to injury. Survey responses were received...illness, and health behavior data is recommended for monitoring of physical training program effects and collection of data necessary to inform future...calculated for demographics, personal characteristics, physical fitness and occupational demands, leadership and medical support, health behaviors

  12. Risk assessment techniques for industrial installations

    International Nuclear Information System (INIS)

    Croitoru, C.; Dumitrescu, M.; Preda, I.; Stefanescu, I.; Titescu, G.

    1995-01-01

    This paper presents a risk analysis which concerns the following stages: identification of the initiation events, evaluation of the occurrence frequency of different accident sequences, assessment of human, economical, and environmental consequences, risk assessment and management. The study of the accident sequences subsequent to an initiation event was achieved by the event tree method. Also, there were developed methods based on mathematical models of installations which take into account reliability data, data concerning the exploitation history, and data referring to the human factor effects in the installation operation. These methods were used for the determination of occurrence frequencies of hydrogen sulfide emission accidents in the heavy water production installations

  13. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P. [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines

  14. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations; Rapport de surete du reacteur pegase - tome 1 - Description des installations - tome 2 - Surete des installations

    Energy Technology Data Exchange (ETDEWEB)

    Lacour, J [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Legoin, P [S.E.M. Hispano-Suiza, 92 - Colombes (France)

    1964-07-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [French] Dans le volume 1: Ce rapport est une description du reacteur Pegase, afin d'examiner la surete des installations. Le site de CADARACHE ou elles sont situees, a ete sommairement decrit, en particulier, a cause des consequences sur les techniques mises en oeuvre pour la realisation de Pegase. Nous nous sommes egalement attache a decrire les aspects originaux du reacteur. Les boucles autonomes destinees a tester en vraie grandeur des elements combustibles de la filiere uranium naturel graphite-gaz, ainsi que leurs dispositifs de controle et d'exploitation, figurent egalement dans ce rapport. Dans le volume 2: Dans le present rapport, nous examinons des accidents pouvant endommager des installations du reacteur Pegase. Les origines d'accidents examines comprennent la seismicite

  15. Installation of beam screens in LHC arc cryomagnets

    CERN Document Server

    Cruikshank, P; Schneider, G; Veness, R J M

    1999-01-01

    Beam screens will be installed in the cold bores of the LHC arc cryodipoles and Short Straight Sections (SSS). This note describes the constraints on the beam screen installation imposed by the beam vacuum interconnects and Beam Position Monitors (BPM), and explains the installation scenario which has been adopted.

  16. 77 FR 2118 - In the Matter of the Designation of al-Qa'ida Kurdish Battalions (AQKB), Also Known as Kurdistan...

    Science.gov (United States)

    2012-01-13

    ... Battalions (AQKB), Also Known as Kurdistan Brigades, Also Known as Kurdistan Battalion of Islamic State in Iraq, Also Known as Kurdistan Brigade of al-Qaeda in Iraq, as a Specially Designated Global Terrorist... known as al-Qa'ida Kurdish Battalions (AQKB), also known as Kurdistan Brigades, also known as, Kurdistan...

  17. Site evaluation for nuclear installations. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Siting, which was issued in 1988 as Safety Series No. 50-C-S (Rev. 1). It takes account of developments relating to site evaluations for nuclear installations since the Code on Siting was last revised. These developments include the issuing of the Safety Fundamentals publication on The Safety of Nuclear Installations, and the revision of various safety standards and other publications relating to safety. Requirements for site evaluation are intended to ensure adequate protection of site personnel, the public and the environment from the effects of ionizing radiation arising from nuclear installations. It is recognized that there are steady advances in technology and scientific knowledge, in nuclear safety and in what is considered adequate protection. Safety requirements change with these advances and this publication reflects the present consensus among States. This Safety Requirements publication was prepared under the IAEA programme on safety standards for nuclear installations. It establishes requirements and provides criteria for ensuring safety in site evaluation for nuclear installations. The Safety Guides on site evaluation listed in the references provide recommendations on how to meet the requirements established in this Safety Requirements publication. The objective of this publication is to establish the requirements for the elements of a site evaluation for a nuclear installation so as to characterize fully the site specific conditions pertinent to the safety of a nuclear installation. The purpose is to establish requirements for criteria, to be applied as appropriate to site and site-installation interaction in operational states and accident conditions, including those that could lead to emergency measures for: (a) Defining the extent of information on a proposed site to be presented by the applicant; (b) Evaluating a proposed site to ensure that the site

  18. Installation Service - Changes in opening hours

    CERN Multimedia

    GS Department

    2010-01-01

    For organizational matters, please note that, as from 15 March 2010, the Installation Service will have wen opening hours. The new schedule will be from 14:00 to 17:00 (Monday to Friday). Contact persons are: Martine Briant, Karine Robert and Claudia Bruggmann. The office address remains 73-3-014. Installation Service

  19. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photo 01: Pictured with the newly installed magnet and transport system in the transfer line tunnel are (left to right) Volker Mertens, responsible for the LHC injection and transfer lines; personnel involved in tr...

  20. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system.Photos 01, 02: Pictured with the newly installed magnet and transport system in the transfer line tunnel are LHC project leader Lyn Evans (second left, white helmet); Volker Mertens, responsible for the LHC injecti...

  1. Update of the database of photovoltaic installations in the UK

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, D.; Bruhns, H.

    1999-07-01

    The article describes an updated database of photovoltaic (PV) installations in the UK. The database contains more than 300 records representing over 40,000 photovoltaic installations with more than 100 buildings that use photovoltaic arrays. Figures show: (i) a chart of cumulative PV applications to date; (ii) a chart of cumulative installations in the database; (iii) the growth of Building Integrated PV installed to date; (iv) the cumulative growth of peak power of PV for buildings installed every year since 1985; (v) the distribution by application of all PV installations in the database and (vi) the various applications of PV installations.

  2. Proper Installation of Replacement Windows | Efficient Windows

    Science.gov (United States)

    Collaborative Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring

  3. Installation, operation, and maintenance for the pyramidal optics solar system installed at Yacht Cover, Columbia, South Carolina

    Science.gov (United States)

    1980-09-01

    Information concerning the installation, operation, and maintenance of the pyramidal Solar System for space heating and domestic hot water is presented. Principles of operation, sequence of installation, and procedures for the operation and maintenance of each subsystem making up the solar system are presented. Troubleshooting charts and maintenance schedules are presented.

  4. 46 CFR 119.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 119.430 Section 119... INSTALLATION Specific Machinery Requirements § 119.430 Engine exhaust pipe installation. (a) The design of all... an exhaust pipe. (b) Exhaust gas must not leak from the piping or any connections. The piping must be...

  5. Deutscher Wetterdienst (DWD). Annual report 2004; Deutscher Wetterdienst (DWD). Jahresbericht 2004

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    Today, the Deutscher Wetterdienst (DWD) with its measuring and observation networks is already an important component in the planned world-spanning Earth observation system. The exchange of data as well as the harmonisation and further development of the networks on a partnership basis have also been a matter of course of the National Meteorological Services for decades now. With its experience and expertise the DWD will be taking an active part in Germany's contributions to the global Earth observation. On a national level, the major tasks of the Deutscher Wetterdienst include the monitoring of the environment, the weather, and the climate change in Germany. In 2004, too, the DWD was able to reinforce its position as an innovative, efficient, and customer-oriented National Meteorological Service and as a reference for meteorology. For example, the radar-supported FEWIS weather information system for fire brigades was installed throughout Germany in almost all professional fire brigade units and numerous other disaster relief organisations. This is an important contribution to improving the warning management in the case of severe weather events in Germany. The cooperation between the DWD as a federal authority and the Laender was further intensified. (orig.)

  6. 30 CFR 57.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or... wiring. ...

  7. Installations of SNCR on bark-fired boilers

    International Nuclear Information System (INIS)

    Hjalmarsson, A.K.; Hedin, K.; Andersson, Lars

    1997-01-01

    Experience has been collected from the twelve bark-fired boilers in Sweden with selective non catalytic reduction (SNCR) installations to reduce emissions of nitrogen oxides. Most of the boilers have slope grates, but there are also two boilers with cyclone ovens and two fluidized bed boilers. In addition to oil there are also possibilities to burn other fuel types in most boilers, such as sludge from different parts of the pulp and paper mills, saw dust and wood chips. The SNCR installations seems in general to be of simple design. In most installations the injection nozzles are located in existing holes in the boiler walls. The availability is reported to be good from several of the SNCR installations. There has been tube leakage in several boilers. The urea system has resulted in corrosion and in clogging of one oil burner. This incident has resulted in a decision not to use SNCR system with the present design of the system. The fuel has also caused operational problems with the SNCR system in several of the installations due to variations in the moisture content and often high moisture content in bark and sludge, causing temperature variations. The availability is presented to be high for the SNCR system at several of the plants, in two of them about 90 %. The results in NO x reduction vary between the installations depending on boiler, fuel and operation. The emissions are between 45 and 100 mg NO 2 /MJ fuel input and the NO x reduction rates are in most installations between 30 and 40 %, the lowest 20 and the highest 70 %. 13 figs, 3 tabs

  8. The Swiss nuclear installations annual report 1992

    International Nuclear Information System (INIS)

    1993-06-01

    This report concerns the safety of the Swiss nuclear installations in the period of 1992. Surveillance of these installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). In Switzerland five nuclear power plants are operational: Beznau I and II, Muehleberg, Goesgen and Leibstadt. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basle. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut down experimental reactor of Lucens, the exploration in Switzerland of final disposal facilities for radwaste and the interim radwaste storage facilities. The present report first deals with the nuclear power plants and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK (chapters 1-4). In chapter 5, the corresponding information is given for the research installations. Chapter 6 on radwaste disposal is dedicated to the waste treatment, waste from reprocessing, interim storage and exploration by the NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' vicinity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into some general questions relating to the safety of nuclear installations, and in particular covers important events in nuclear installations abroad. In all, the operation of the Swiss nuclear installations in the period of 1992 is rated safe by HSK. (author) 7 figs., 13 tabs

  9. 562,3 MWP installed in european union

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    In the end, the growth problems that were announced for the European photovoltaic market did not happen. With 170 MWp of additional capacity installed in the European Union 2003 has marked a new record high in installations bringing European installed capacity up to the neighbourhood of 562 MWp. While this sector's expansion has been remarkable (+ 43.4 % with respect to 2002), a lot of questions still remain with respect to the true will of certain countries to develop this form of energy. (author)

  10. 49 CFR 192.321 - Installation of plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Installation of plastic pipe. 192.321 Section 192... Transmission Lines and Mains § 192.321 Installation of plastic pipe. (a) Plastic pipe must be installed below ground level except as provided by paragraphs (g) and (h) of this section. (b) Plastic pipe that is...

  11. Evaluation of Installation Time for SMASHmount by SMASHsolar

    Energy Technology Data Exchange (ETDEWEB)

    2017-04-05

    The Department of Energy SunShot Incubator program provides early-stage assistance to help startup companies cross technological barriers to commercialization while encouraging private sector investment. The SunShot Incubator program aims to shorten the time it takes for a young business or company to develop an innovative product concept and make it commercially available, which includes product prototyping, deployment, and, potentially, manufacturing. SMASHsolar was selected as an Incubator awardee to develop a simple, snap-together, module-integrated photovoltaic (PV) mounting system in attempts to dramatically reduce the time, effort and skill needed to install rooftop solar. In support of this award, the National Renewable Energy Laboratory worked with SMASHsolar to develop a procedure for evaluating the installation time required for the SMASHmount system vs. widely-available rail systems. Amongst several installations, NREL measured the following installation times, subject to the qualifications and conditions described later in this report. NREL found that the SMASHsolar SMASHmount system was installed between 15% and 37% faster than tested competing systems after one or two installations of the system.

  12. Canberra Alpha Sentry Installation Functional Design Criteria (FDC)

    International Nuclear Information System (INIS)

    WHITE, W.F.

    1999-01-01

    This document provides the functional design criteria for the installation of the Canberra Alpha Sentry System at selected locations within the Plutonium Finishing Plant (PFP). The equipment being installed is identified by part number in Section 3 and the locations are given in Section 5. The design, procurement and installation are assigned to Fluor Federal Services

  13. An earth anchor system: installation and design guide.

    Science.gov (United States)

    R.L. Copstead; D.D. Studier

    1990-01-01

    A system for anchoring the guylines and skylines of cable yarding equipment is presented. A description of three types of tipping plate anchors is given. Descriptions of the installation equipment and methods specific to each type are given. Procedures for determining the correct number of anchors to install are included, as are guidelines for installing the anchors so...

  14. Killing Range

    Science.gov (United States)

    Asal, Victor; Rethemeyer, R. Karl; Horgan, John

    2015-01-01

    This paper presents an analysis of the Provisional Irish Republican Army's (PIRA) brigade level behavior during the Northern Ireland Conflict (1970-1998) and identifies the organizational factors that impact a brigade's lethality as measured via terrorist attacks. Key independent variables include levels of technical expertise, cadre age, counter-terrorism policies experienced, brigade size, and IED components and delivery methods. We find that technical expertise within a brigade allows for careful IED usage, which significantly minimizes civilian casualties (a specific strategic goal of PIRA) while increasing the ability to kill more high value targets with IEDs. Lethal counter-terrorism events also significantly affect a brigade's likelihood of killing both civilians and high-value targets but in different ways. Killing PIRA members significantly decreases IED fatalities but also significantly decreases the possibility of zero civilian IED-related deaths in a given year. Killing innocent Catholics in a Brigade's county significantly increases total and civilian IED fatalities. Together the results suggest the necessity to analyze dynamic situational variables that impact terrorist group behavior at the sub-unit level. PMID:25838603

  15. New technique for landfill leachate well installation

    International Nuclear Information System (INIS)

    Hornsby, R.G.; Miller, M.S.

    1991-01-01

    The installation method fulfilled our expectations. The entire well installation took eight writing days to complete, for an average of two wells per day. It met our Health and Safety, waste volume, environmental risk and uniform sandpack expectations. Health and Safety concerns were minimal. We found that virtually all work could be completed using Level D protection. The volume of waste produced by the well installation was extremely low. The core samples and casing scrapings were the only well installation wastes directly produced. The waste containers which required sampling prior to disposal were: Decontaminated water (330 gallons), Personnel protective equipment and water (715 gallons), Soil cores (25 gallons), Land leachate (440 gallons). Each waste type was sampled and submitted to a laboratory for analyses of full Appendix 3 plus U.S. EPA toxicity parameters. The results verified that all of the wastes could be disposed of on-site. Since the only drilling wastes were the clay core samples and the very small amount of material adhering to the casing, contamination of the new clay cap did not occur. A uniform sandpack was guaranteed through the use of a presanded well screen. The loose sand added when the casing was removed served to fill any voids. All the leachate wells have water in them, and it appears that they will function adequately. We are in the process of constructing a treatment and storage facility to manage the liquids to be extracted for off-site disposal. The long-term effectiveness of the wells will be quantified. This well installation method should be considered in situations requiring the following: expedited installation; reduced Health and Safety concerns; reduced disposal costs; reduced potential for adverse environmental impact; and comparable installation costs. The choice of this method must include considerations of the subsurface geology and the nature of any manmade materials

  16. Safety of nuclear installations

    International Nuclear Information System (INIS)

    1991-01-01

    In accordance with the Nuclear Energy Act, a Licence may only be issued if the precautions required by the state of the art have been taken to prevent damage resulting from the construction and operation of the installation. The maximum admissible body doses in the area around the installation which must be observed in planning constructional and other technical protective measures to counter accidents in or at a nuclear power station (accident planning values, are established). According to the Radiological Protection Ordinance the Licensing Authority can consider these precautions to have been taken if, in designing the installation against accidents, the applicant has assumed the accidents which, according to the Safety Criteria and Guidelines for Nuclear Power Stations published in the Federal Register by the Federal Minister of the Interior after hearing the competent senior state authorities, must determine the design of a nuclear power station. On the basis of previous experience from safety analysis, assessment and operation of nuclear power stations, the accident guidelines published here define which accidents are determinative for the safety-related design of PWR power stations and what verification -particularly with regard to compliance with the accident planning values of the Radiological Protection Ordinance -must be provided by the applicant. (author)

  17. The Impact of Racial Integration on the Combat Effectiveness of Eighth (US) Army during the Korean War

    Science.gov (United States)

    2011-12-01

    voting.”265 Integration combatted this cognitive dissonance , creating a sense of equality and pride in many African-American soldiers. Many found...180 Both Generals Bradley and Hodges expressed satisfaction with the African-American infantry soldiers. The 78th Infantry Division commanding

  18. Department of the Army Installation Restoration Program

    International Nuclear Information System (INIS)

    Anderson, A.W.

    1988-01-01

    The Army's Installation Restoration Program (IRP) was established in 1975 in response to regulatory action at several installations where past disposal practices had caused contamination of streams and groundwater. The need to decontaminate excess Army-owned real estate also was considered in early IRP activities. A variety of site types have been discovered on Army installations. The major site types evaluated to date include: contaminated soil areas, landfills, lagoons, buildings, burning grounds, sumps, pits, storage tanks, sewage treatment plants, storage pads, industrial wastewater treatment plants, and salvage yards. Twenty Army installations have been proposed for or listed on the National Priorities List (NPL). The need for taking action at hazardous waste sites, however, is based on threats they pose to human health, welfare or the environment. Sites do not have to be on the SPL in order to be cleaned up through IRP activities. All of the sites that caused Army installations to be proposed for the NPL are being evaluated and cleaned up. In addition, all Army properties have been or will be assessed and where needed they will be addressed by the IRP

  19. Design and installation of earth energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Loggia, S; Adragna, M; Coyle, S; Foley, C; Hawryn, S; Martin, A; McConnell, J [eds.

    2002-07-01

    This first edition of the Canadian Standards Association (CSA) Standard C448 Series, replaces CSA Standards CAN/CSA-C445-M92 entitled Design and Installation of Earth Energy Heat Pump Systems for Residential and Other Small Buildings, as well as C447-94 entitled Design and Installation of Earth Energy Heat Pump Systems for Commercial and Institutional Buildings. This standard document consists of three parts: (C448.1) Design and installation of earth energy systems for commercial and institutional buildings; (C448.2) Design and installation of earth energy systems for residential and small buildings; and, (C448.3) Design and installation of underground thermal energy storage systems for commercial and institutional buildings. In C448.1, the requirements applicable to any system falling within the scope of the C448 series were included. Alternative requirements for houses and small buildings were added in C448.2. It was noted that either standard may be implemented. The standards applicable to the intentional storage of energy in the earth for later use were presented in C448.3. This latter section includes a brief introduction on underground thermal energy storage (UTES). tabs.

  20. Data Acquisition System On Beta Installation

    International Nuclear Information System (INIS)

    Abtokhi, Ahmad; Nurhanan; Sudarno; Sumarno, Edy

    2000-01-01

    Data acquisition system is needed on every installation. This is important used to monitoring and processing data to get information desired. This system applied to β installation which is facility to carry out experiments on accident condition like as reflooding phenomena in test section. The 16 exp.th channel data acquisition system is drived by ADC 0804 and programme application DELPHI

  1. Performance of cooling installation for cyclotron Decy-13

    International Nuclear Information System (INIS)

    Edi Trijono Budisantoso; Suprapto; Sutadi

    2015-01-01

    Has been calculated the cooling installation performance of Decy-13 cyclotron. The cooling installation is analysed based on the technical specifications of each cooling component to proof the results of the design and implementation of installations meet the cooling requirement. Analysis of loss of pressure and flow rate in the piping installation is done empirically using Hazen-Williams equation while the analysis of heat transfer processes in the cooling tower is done using the help of psychometric charts that available. Cooling component consists of a condenser and associated piping systems with cooling towers and equipped with a pump to push the circulation of cooling. The calculations show that the installation of the condenser cooler uses the cooling tower LiangChi LBC-30 with a booster pump Grundfos 4 kW NF30-36T powered 47kW able to transfer heat with the coolant flow rate 136 lpm, input to output coolant pressure difference 2.1atm and the cooling temperature difference 5 °C. Conclusion of the calculation is the technical specifications of cooling components and installation already meets the needs of the cooling expected. (author)

  2. Installing Ubuntu Enterprise Cloud in a Physical Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to “Guidelines for Building a Private Cloud Infrastructure.” This supplemental material provides guidance on how to install Ubuntu Enterprise Cloud in a physical environment. The purpose of this document is to provide a practical, step......-by-step, detailed guide on how to pre-configure and install the machines and network. For more detailed description of the steps, a reader is advised to refer to another supplemental book named “Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment.” There are a few more details, accompanied...... with screenshots. The material included in this supplemental document is based on the installation that was performed in a physical environment based on HP ProLiant DL380 G4 servers, 100 Mbit/s witches, and a firewall/router that isolated the whole solution. The cloud installation was performed using the (for...

  3. Installation of an accelerator from theory to practice

    CERN Document Server

    Foraz, K; Weisz, S; CERN. Geneva. TS Department

    2004-01-01

    The size and complexity of the LHC project at CERN calls for a strong co-ordination of all installation activities. The detailed installation planning has to take into account many constraints such as the component production rates, the installation contracts or the transport and handling requirements in a narrow tunnel with limited access points. The planning also needs to be flexible enough to cope with aleas that are unavoidable in such a large project that spans over many years. This paper describes the follow-up methodology, both in the field and in the office, adopted by the IC team to assist the groups involved in the installation of the LHC machine.

  4. Entropy and Digital Installation

    Directory of Open Access Journals (Sweden)

    Susan Ballard

    2005-01-01

    Full Text Available This paper examines entropy as a process which introduces ideas of distributed materiality to digital installation. Beginning from an analysis of entropy as both force and probability measure within information theory and it’s extension in Ruldof Arnheim’s text ‘Entropy and Art” it develops an argument for the positive rather thannegative forces of entropy. The paper centres on a discussion of two recent works by New Zealand artists Ronnie van Hout (“On the Run”, Wellington City Gallery, NZ, 2004 and Alex Monteith (“Invisible Cities”, Physics Room Contemporary Art Space, Christchurch, NZ, 2004. Ballard suggests that entropy, rather than being a hindrance to understanding or a random chaotic force, discloses a necessary and material politics of noise present in digital installation.

  5. Offshore wind transport and installation vessel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    The initial objective of the project was to complete a feasibility study to determine the viability of an innovative transportation vessel to be deployed in the installation of offshore wind farms. This included the feasibility of providing a stable-working platform that can be used in harsh offshore environments. A study of current installation contractors and their installation equipment was used to provide a preliminary specification for the installation vessel. A typical barge was selected and a number of hydrodynamic analyses were carried out in order to establish it's on course and operational stability. The analysis proved the stability of the vessel during operation was critical and that in order to utilise the crane's full potential a stabilisation system must be employed. The main aim of the work to date was to establish whether it was feasible to use a stabilisation system on the installation vessel. The spud leg FEED study established that it was feasible to use spud legs to stabilise the vessel. In order to achieve the degree of stability required it is necessary to lift the vessel completely out of the water. This was not the original aim of the study but due to the external loads on the hull it was the only viable option. Lifting the vessel out of the water results in the legs and leg casings becoming very large. This has a number of consequences for the final design. Due to large loads on the legs spud cans must be used to avoid bottom penetration, the spud cans increase the draft of the vessel by 2m. The large loads require larger winches and more reeving to be used, this results in larger pumps and motors, all of which have to be housed. The stabilisation system has been proved to be feasible for a large installation vessel, the cost and physical size are however more excessive than first anticipated. (Author)

  6. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  7. 14 CFR 27.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 27.967 Section 27.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.967 Fuel tank installation. (a...

  8. 14 CFR 29.967 - Fuel tank installation.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installation. 29.967 Section 29.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.967 Fuel tank installation...

  9. 14 CFR 25.967 - Fuel tank installations.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel tank installations. 25.967 Section 25.967 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.967 Fuel tank installations...

  10. Installed water resource modelling systems for catchment ...

    African Journals Online (AJOL)

    Following international trends there are a growing number of modelling systems being installed for integrated water resource management, in Southern Africa. Such systems are likely to be installed for operational use in ongoing learning, research, strategic planning and consensus-building amongst stakeholders in the ...

  11. Evaluation Of RSG-GAS Power Installed After 12 Years

    International Nuclear Information System (INIS)

    Mrsahala, Yan Bony

    2001-01-01

    The total power installed in RSG-GAS electric system less then 3 x 2500 KVA. Some of powers installed included are the never used loads, so the operationally total load installed that regularly operational and incidental are amount about 3700 KVA. In this condition, the capacity of power transformer installed 3 x 2500 KVA becomes larger. The influences of the numinous power are electric bill payment by RSG-GAS. The reduces power installed may be done as well as remember that some of the load not be operation so that the power consume for that facility could be cut off. The evaluation and calculation result gives some alternatively can be selected to minimize the electric bill payment

  12. An application of residual current protective device at electrical installation

    International Nuclear Information System (INIS)

    Firman Silitonga

    2008-01-01

    In an electrical installation, a protection for overload and short circuit are always to be installed. In addition to the installation, it is necessary to be installed a protection device for residual current because both the short circuit and the overload device protection will not work for the residual current. The quantity of the residual current must be defined first at any electrical installation to define an appropriate residual current protection so that not every residual current will break the circuit down. This paper will explain a method how to install a residual protection device for 3500 VA or more at TN and TT of earthing system. (author)

  13. 30 CFR 77.212 - Draw-off tunnel ventilation fans; installation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Draw-off tunnel ventilation fans; installation... UNDERGROUND COAL MINES Surface Installations § 77.212 Draw-off tunnel ventilation fans; installation. When fans are used to ventilate draw-off tunnels the fans shall be: (a) Installed on the surface; (b...

  14. Installing and Testing a Server Operating System

    Directory of Open Access Journals (Sweden)

    Lorentz JÄNTSCHI

    2003-08-01

    Full Text Available The paper is based on the experience of the author with the FreeBSD server operating system administration on three servers in use under academicdirect.ro domain.The paper describes a set of installation, preparation, and administration aspects of a FreeBSD server.First issue of the paper is the installation procedure of FreeBSD operating system on i386 computer architecture. Discussed problems are boot disks preparation and using, hard disk partitioning and operating system installation using a existent network topology and a internet connection.Second issue is the optimization procedure of operating system, server services installation, and configuration. Discussed problems are kernel and services configuration, system and services optimization.The third issue is about client-server applications. Using operating system utilities calls we present an original application, which allows displaying the system information in a friendly web interface. An original program designed for molecular structure analysis was adapted for systems performance comparisons and it serves for a discussion of Pentium, Pentium II and Pentium III processors computation speed.The last issue of the paper discusses the installation and configuration aspects of dial-in service on a UNIX-based operating system. The discussion includes serial ports, ppp and pppd services configuration, ppp and tun devices using.

  15. The ATLAS software installation system for LCG/EGEE

    Energy Technology Data Exchange (ETDEWEB)

    Salvo, A D [Istituto Nazionale di Fisica Nucleare, sez. Roma 1 (Italy); Barchiesi, A [Universita di Roma I ' La Sapienza' (Italy); Gnanvo, K [Queen Mary and Westfield College (United Kingdom); Gwilliam, C [University of Liverpool (United Kingdom); Kennedy, J; Krobath, G [Ludwig-Maximilians-Universitaet Muenchen (Germany); Olszewski, A [Henryk Niewodniczanski Institute of Nuclear Physics, Polish Academy of Sciences (Poland); Rybkine, G [Royal Holloway College (United Kingdom)

    2008-07-15

    The huge amount of resources available in the Grids, and the necessity to have the most up-to-date experimental software deployed in all the sites within a few hours, have driven the need for an automatic installation system for the LHC experiments. In this work we describe the ATLAS system for the experiment software installation in LCG/EGEE, based on the Light Job Submission Framework for Installation (LJSFi), an independent job submission framework for generic submission and job tracking in EGEE. LJSFi is able to automatically discover, check, install, test and tag the full set of resources made available in LCG/EGEE to the ATLAS Virtual Organization in a few hours, depending on the site availability.

  16. 16 CFR 460.17 - What installers must tell their customers.

    Science.gov (United States)

    2010-01-01

    ... 16 Commercial Practices 1 2010-01-01 2010-01-01 false What installers must tell their customers... AND ADVERTISING OF HOME INSULATION § 460.17 What installers must tell their customers. If you are an installer, you must give your customers a contract or receipt for the insulation you install. For all...

  17. 29 CFR 1910.306 - Specific purpose equipment and installations.

    Science.gov (United States)

    2010-07-01

    ...) Cranes and hoists. This paragraph applies to the installation of electric equipment and wiring used in..., and similar events. This paragraph covers the installation of portable wiring and equipment, including... 29 Labor 5 2010-07-01 2010-07-01 false Specific purpose equipment and installations. 1910.306...

  18. Using game engines in mixed reality installations

    NARCIS (Netherlands)

    Nakevska, M.; Vos, E.C.; Juarez, Alex; Hu, J.; Langereis, G.R.; Rauterberg, G.W.M.; Anacleto, J.; Fels, S.; Graham, N.; et al., xx

    2011-01-01

    In a mixed reality installation, a variety of technologies is integrated such as virtual reality, augmented reality, and animated virtual agents and robotic agents. One of the main challenges is how to design and implement a mixed reality installation that integrates a heterogeneous array of sensors

  19. Installation of the LHC transfer lines begins

    CERN Multimedia

    Patrice Loïez

    2003-01-01

    The first of 700 magnets has been installed in one of the two transfer tunnels built to transfer the SPS beam into the LHC. The start of this first installation phase of the LHC transfer lines provides the opportunity to launch a new and highly original modular system for transporting and installing all kinds of magnets in very narrow tunnels. The system is based on very compact bogies, up to four of which can be coupled together to form a convoy. The wheels are fitted with individual motors enabling them to swivel through an angle of 90° and the convoy to move laterally. In this way the magnet is delivered directly to its installation point, but beneath the beamline. It is then raised into its final position in the beamline using air cushions, which form an integrated part of the transport system. Here we see the transport vehicle alongside the magnet supports. Visible in the background is the first magnet in place.

  20. Design, fabrication and installation of irradiation facilities

    International Nuclear Information System (INIS)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C.

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs

  1. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Yong Sung; Lee, C. Y.; Kim, J. Y.; Chi, D. Y.; Kim, S. H.; Ahn, S. H.; Kim, S. J.; Kim, J. K.; Yang, S. H.; Yang, S. Y.; Kim, H. R.; Kim, H.; Lee, K. H.; Lee, B. C.; Park, C.; Lee, C. T.; Cho, S. W.; Kwak, K. K.; Suk, H. C. [and others

    1997-07-01

    The principle contents of this project are to design, fabricate and install the steady-state fuel test loop and non-instrumented capsule in HANARO for nuclear technology development. This project will be completed in 1999, the basic and detail design, safety analysis, and procurement of main equipment for fuel test loop have been performed and also the piping in gallery and the support for IPS piping in reactor pool have been installed in 1994. In the area of non-instrumented capsule for material irradiation test, the fabrication of capsule has been completed. Procurement, fabrication and installation of the fuel test loop will be implemented continuously till 1999. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and safety analysis report has been submitted to KINS to get a license and review of HANARO interface have been performed respectively. (author). 39 refs., 28 tabs., 21 figs.

  2. Use and regulatory control of dental X-ray installations

    International Nuclear Information System (INIS)

    1999-01-01

    In the guide the safety requirements concerning dental X-ray installations and their use, prerequisities for exemption from a safety licence, and regulatory control are presented. The guide applies to conventional dental X-ray installations, by which an image is created on an X-ray film or other image receptor placed inside the mouth, and panorama tomography installations for dentition and the cephalostats associated with these. The guide does not apply to multitechnique tomography installations intended for the special imaging of the skull or jaws

  3. Experience of attaining high labor productivity in a stoping face using mechanized complex 110PK-70

    Energy Technology Data Exchange (ETDEWEB)

    Reshetnikov, M N

    1982-01-01

    In 1979 when the first 1 million T of coal was produced at the mine ''Zyryanovskaya'' high volumes of coal extraction were attained in individual months: in January 102,300 T, in July 122,200 T. In 1980, high results were also attained. In January 106,000 T were extracted and in November 108,500 T of coal. The brigade has accumulated experience for introducing scientific organization of labor and improving labor productivity. In 1977 labor productivity of the workers in the stoping face was 31.5 T per shift, in 1978 variable productivity was elevated to 48.2 T. In 1979 labor productivity reached 67.3 T per shift. The best results for productivity was reached in June 1979, 90 T at the outlet, in February 1980--81.1 T per shift. The success of the brigade is formed of many factors, technical, organizational, economic. The basis for high labor productivity of the workers is timely preparation of new longwalls, normal production conditions for fulfillment of plans and the adopted socialist commitments. An important factor in the work of the extraction brigade is the type and condition of mining equipment. The level of work organization as a whole depends on the brigade, directly on the miners and the section leaders themselves. High conscientiousness of all the brigade members also is important for improving labor productivity. The majority of workers in the brigade (about 70%) are members of the party. Mass technical creativity of all the brigade members is also a great reserve for improving labor efficiency. The brigade has 24 efficiency experts who annually introduce 20-30 suggestions each aimed at improving work efficiency.

  4. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  5. 49 CFR 192.193 - Valve installation in plastic pipe.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Valve installation in plastic pipe. 192.193... Components § 192.193 Valve installation in plastic pipe. Each valve installed in plastic pipe must be designed so as to protect the plastic material against excessive torsional or shearing loads when the valve...

  6. The Management System for Nuclear Installations (Russian Edition)

    International Nuclear Information System (INIS)

    2014-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  7. The Management System for Nuclear Installations Safety Guide

    International Nuclear Information System (INIS)

    2009-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a)To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b)As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c)To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a)Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b)Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c)Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d)Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e)Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear installation. (f

  8. CNGS Reflector installed

    CERN Multimedia

    2006-01-01

    A major component that will help target the CNGS neutrino beam for its 732km journey through the earth's crust, from CERN to the Gran Sasso laboratory in Italy, has been installed in its final position. The transport of the huge magnetic horn reflector through the CNGS access gallery. A team from CNGS and TS/IC, and the contractors DBS, transported the magnetic horn reflector on 5th December, in a carefully conducted operation that took just under two hours. The reflector is 7m long, 1.6m in diameter and 1.6 tonnes in weight. With only a matter of centimetres to spare on either side, the reflector was transported through the CNGS access gallery, before being installed in the experiment's target chamber. The larger of two magnetic horns, the reflector will help refocus sprays of high energy pions and kaons emitted after a 0.5MW stream of protons from the Super Proton Synchrotron (SPS) strikes nucleons in a graphite target. The horns are toroidal magnetic lenses and work with high pulsed currents: 150 kA f...

  9. Solar Panel Installations on Existing Structures

    OpenAIRE

    Tim D. Sass; Pe; Leed

    2013-01-01

    The rising price of fossil fuels, government incentives and growing public aware-ness for the need to implement sustainable energy supplies has resulted in a large in-crease in solar panel installations across the country. For many sites the most eco-nomical solar panel installation uses existing, southerly facing rooftops. Adding solar panels to an existing roof typically means increased loads that must be borne by the building-s structural elements. The structural desig...

  10. 30 CFR 56.12067 - Installation of transformers.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at... at least 6 feet high and at least 3 feet from any energized parts, casings, or wiring. ...

  11. Installation package for the Solaron solar subsystem

    Science.gov (United States)

    1979-01-01

    Information that is intended to be a guide for installation, operation, and maintenance of the various solar subsystems is presented. The subsystems consist of the following: collectors, storage, transport (air handler) and controller for heat pump and peak storage. Two prototype residential systems were installed at Akron, Ohio, and Duffield, Virginia.

  12. 46 CFR 176.702 - Installation tests and inspections.

    Science.gov (United States)

    2010-10-01

    ..., machinery, fuel tank, or pressure vessel is installed aboard a vessel after completion of the initial... 100 GROSS TONS) INSPECTION AND CERTIFICATION Repairs and Alterations § 176.702 Installation tests and...

  13. Visiting the SPS installation

    CERN Multimedia

    1975-01-01

    ...., Guenther Loehr, Hans Horisberger walk along the SPS tunnel: here, on the right, an absorber block of 22 tons for beam dumping in the external beam lines. The chariot serves for the installation of the block.

  14. Licensing of away-from-reactor (AFR) installations

    International Nuclear Information System (INIS)

    Gray, P.L.

    1980-01-01

    Storage of spent fuel at Away-From-Reactor (AFR) installations will allow reactors to continue to operate until reprocessing or other fuel disposal means are available. AFR installations must be licensed by the Nuclear Regulatory Commission (NRC). Although wide experience in licensing reactors exists, the licensing of an AFR installation is a relatively new activity. Only one has been licensed to date. This paper delineates the requirements for licensing an AFR installation and projects a licensing schedule. Because the NRC is developing specific AFR requirements, this schedule is based primarily on draft NRC documents. The major documents needed for an AFR license application are similar to those for a reactor. They include: a Safety Analysis Report (SAR), and Environmental Report (ER), safeguards and security plans, decommissioning plans, proposed technical specifications, and others. However, the licensing effort has one major difference in that for AFR installations it will be a one-step effort, with follow-up, rather than the two-step process used for reactors. The projected licensing schedule shows that the elapsed time between filing an application and issuance of a license will be about 32 months, assuming intervention. The legal procedural steps will determine the time schedule and will override considerations of technical complexity. A license could be issued in about 14 months in the absence of intervention

  15. Proper Installation of New Windows | Efficient Windows Collaborative

    Science.gov (United States)

    Foundry Foundry New Construction Windows Window Selection Tool Selection Process Design Guidance Installation Replacement Windows Window Selection Tool Assessing Options Selection Process Design Guidance Installation Understanding Windows Benefits Design Considerations Measuring Performance Performance Standards

  16. Solar system installation at Louisville, Kentucky

    Science.gov (United States)

    1978-01-01

    The installation of a solar space heating and domestic hot water system is described. The overall philosophy used was to install both a liquid and a hot air system retrofitted to existing office and combined warehouse building. The 1080 sq. ft. office space is heated first and excess heat is dumped into the warehouse. The two systems offer a unique opportunity to measure the performance and compare results of both air and liquid at one site.

  17. Installing fonts in LaTeX a user's experience

    NARCIS (Netherlands)

    Hanssen, F.T.Y.

    2003-01-01

    This paper presents a user's experience with installing fonts for use in LaTeX. It will be shown that it is not hard to make a standard Type 1 font work, if you use modern font installation software for LaTeX. All the steps necessary to install the example fonts will be shown. The example fonts used

  18. ATLAS semiconductor tracker installed into its barrel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The ATLAS silicon tracker is installed in the silicon tracker barrel. Absolute precision was required in this operation to ensure that the tracker was inserted without damage through minimal clearance. The installation was performed in a clean room on the CERN site so that no impurities in the air would contaminate the tracker's systems.

  19. First detector installed inside the ALICE solenoid...

    CERN Multimedia

    2006-01-01

    ALICE's emblematic red magnet welcomed its first detector on 23 September, when the array of seven Cherenkov detectors, named HMPID, was successfully installed. ALICE team members standing in front of the completed HMPID detector.The red magnet, viewed from its front opening. The HMPID unit, seen from the back (top right corner of photo) is placed on a frame and lifted onto a platform during the installation. After the installation of the ACORDE scintillator array and the muon trigger and tracking chambers, the ALICE collaboration fitted the first detector inside the solenoid. The HMPID, for High Momentum Particle Identification, was installed at the 2 o'clock position in the central and most external region of the space frame, just below the solenoid yoke. It will be used to extend the hadron identification capability of the ALICE experiment up to 5 GeV/c, thus complementing the reach of the other particle identification systems (ITS, TPC and TOF). The HMPID is a Ring Imaging Cherenkov (RICH) detector in a...

  20. Piezometer installation and monitoring procedure: Revision 1

    International Nuclear Information System (INIS)

    1987-04-01

    The Deaf Smith County (Texas) site has been selected by the US Department of Energy as one of three candidate sites for characterization to determine its suitability as a geologic repository for high-level nuclear waste. The installation and monitoring of piezometers has been identified as one of the tasks required during the development of an underground Exploratory Shaft Facility to satisfy specific information needs through a program of in situ testing, instrumentation and monitoring. The scope of piezometer installation and monitoring encompasses the installation of fluid pressure measuring equipment and the subsequent collection, presentation and interpretation of piezometric data from strata surrounding the Exploratory Shaft Facility (ESF) prior to, during and following construction of the ESF, and as part of geohydrologic testing within the ESF. This procedure describes the required instrumentation, equipment, and sequence of activities for piezometer installation in the ESF. The procedure also includes details on the data recording and presentation requirements, personnel responsibilities, test management and quality assurance. 16 refs., 12 figs., 2 tabs

  1. Industrial installation surveillance acoustic device

    International Nuclear Information System (INIS)

    Marini, Jean; Audenard, Bernard.

    1981-01-01

    The purpose of this invention is the detection of possible impacts of bodies migrating inside the installation, using acoustic sensors of the waves emitted at the time of impact of the migrating bodies. This device makes it possible to take into account only those acoustic signals relating to the impacts of bodies migrating in the area under surveillance, to the exclusion of any other acoustic or electric perturbing phenomenon. The invention has a preferential use in the case of a linear shape installation in which a fluid flows at high rate, such as a section of the primary system of a pressurized water nuclear reactor [fr

  2. Wind power installations in Switzerland - Checklist for investors in large-scale installations; Eoliennes en Suisse. Liste de controle pour investisseurs de grandes installations

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Kaufmann, Y.; Steiner, P. [Econcept AG, Zuerich (Switzerland); Gilgen, K.; Sartoris, A. [IRAP-HSR, Institut fuer Raumentwicklung an der Hochschule fuer Technik Rapperswil, Rapperswil (Switzerland)

    2008-07-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at a checklist for investors in large-scale wind-power installations. The authors state that the same questions are often posed in the course of the planning and realisation of wind turbine installations. This document presents a checklist that will help achieve the following goals: Tackling the steps involved in the planning and implementation phases, increasing planning security, systematic implementation in order to reduce risks for investors and to shorten time-scales as well as the reduction of costs. Further, participative processes can be optimised by using comprehensively prepared information in order to reduce the risk of objections during project approval. The structure of the check-list is described and discussed.

  3. You're a What? Solar Photovoltaic Installer

    Science.gov (United States)

    Torpey, Elka Maria

    2009-01-01

    This article talks about solar photovoltaic (PV) installer and features Rebekah Hren, a solar PV installer who puts solar panels on roofs and in other sunny places to turn the sun's power into electricity. Hren enjoys promoting renewable energy, in part because it's an emerging field. In solar PV systems, solar cells--devices that convert sunlight…

  4. Translations From Red Flag, Number 6, 3 June 1978

    Science.gov (United States)

    1978-08-07

    cooperative movement began, the Liming Brigade has for more than 20 years consistently insisted on managing the brigade thriftily, practicing democratic...leadership consisted of mostly old cadres of the Land Reform period and Farm Cooperative Movement . They maintained the spirit of thriftiness, insisted on... cooperative movement . It has been in use for over 20 years. Some commune members said: "At present our brigade has an annual income of over a

  5. Physical installation of Pelletron and electron cooling system

    International Nuclear Information System (INIS)

    Hurh, P.

    1997-01-01

    Bremsstrahlung of 5 MeV electrons at a loss current of 50 microamp in the acceleration region is estimated to produce X-ray intensities of 7 Rad/sec. Radiation losses due to a misteer or sudden obstruction will of course be much higher still (estimated at 87,500 Rad/hr for a 0.5 mA beam current). It is estimated that 1.8 meters of concrete will be necessary to adequately shield the surrounding building areas at any possible Pelletron installation site. To satisfy our present electron cooling development plan, two Pelletron installations are required, the first at our development lab in the Lab B/NEF Enclosure area and the second at the operational Main Injector service building, MI-30, in the main Injector ring. The same actual Pelletron and electron beam-line components will be used at both locations. The Lab B installation will allow experimentation with actual high energy electron beam to develop the optics necessary for the cooling straight while Main Injector/Recycler commissioning is taking place. The MI-30 installation is obviously the permanent home for the Pelletron when electron cooling becomes operational. Construction plans for both installations will be discussed here

  6. Installation Test of Cold Neutron Soruce In-pool Assembly

    International Nuclear Information System (INIS)

    Lee, Kye Hong; Choi, J.; Wu, S. I.; Kim, Y. K.; Cho, Y. G.; Lee, C. H.; Kim, K. R.

    2006-04-01

    Before installation of the final cold neutron source in-pool assembly (IPA) in the vertical CN hole at the HANARO, the research reactor, the installation test of IPA has been conducted in the CN hole of the reactor using a full-scaled mock-up in-pool assembly. The well-known cold neutron sources, being safely operated or being now constructed, had been constructed together with each research reactor; therefore, there was little limitation to obtain the optimal cold neutron source since a cold neutron source had been decided to be installed in the reactor from the beginning of the design for the reactor construction. Unlikely, the HANARO has been operated for 10 years so that we have got lots of design limitation in terms of the decisions in the optimal shape, size, minimal light-water gap, and adhesion degree to the CN beam tube, IPA installation tools, etc. for the construction of the CNS. Accordingly, the main objective of this test is to understand any potential problem or interference happened inside the reactor by installing the mock-up IPA and installation bracket. The outcomes from this test is reflected on the finalizing process of the IPA detail design

  7. AWAKE starts the equipment installation phase

    CERN Multimedia

    Antonella Del Rosso

    2015-01-01

    AWAKE is the proof-of-principle experiment whose aim is to use protons to generate powerful wakefields to accelerate an electron beam. With accelerator gradients hundreds of times higher than those used in current systems, this technique could revolutionise the field of particle acceleration. Installed in the tunnel previously used by the CNGS facility, AWAKE is completing the service installation phase and will receive the plasma cell in the coming months.   The AWAKE proton line with all the magnets installed. (Image: AWAKE collaboration.) AWAKE is the world’s first proton-driven plasma wakefield acceleration experiment. In AWAKE, a beam of protons from the SPS will be travelling through a plasma cell and this will generate a wakefield that, in turn, will accelerate an electron beam. A laser will ionise the gas in the plasma cell and seed the self-modulation instability that will trigger the wakefield in the plasma. The project aims to prove that the plasma wakefield can be driv...

  8. Civil War Logistics: Effects of Logistics on the Pea Ridge Campaign

    Science.gov (United States)

    2015-06-12

    twelve ounces of pork or bacon , or twenty ounces of fresh or salt beef; eighteen ounces bread or flour, or twelve ounces hard bread, or twenty ounces of......Vandever 9th Iowa Infantry Lieutenant Colonel Francis J. Herron 25th Missouri Infantry Colonel John S. Phelps 3rd Independent Battery, Iowa Light

  9. Operational Art and the Sustainment Warfighting Function

    Science.gov (United States)

    2011-12-01

    Infantry Division (ID) a continuous sustainment line of operation. The leap- frogging of Forward Logisitics Bases provided 3rd Infantry Division (ID...victims. A C-17 Globemaster III departed North Carolina and delivered 14,000 Meals Ready-to- Eat , or MREs, and 14,000 quarts of water in a 7-hour round

  10. Rules and regulations on ionizing radiations sources installations

    International Nuclear Information System (INIS)

    1980-01-01

    The finality of this legislative text is to establish the standards and procedures for site, design, building, operation and decommissioning of nuclear installations, radioactive installations and ionizing radiations sources. This text include the commercialization of radioactive substances and equipment fabrication

  11. Preliminary project of installation for separation tubes tests-ITTS

    International Nuclear Information System (INIS)

    Rocha, Z.

    1984-01-01

    A consolidation of actual ideas about installation, entitled ''Installation to separation tubes tests-ITTS'', expected to CDTN is presented. The project bases, the testing to be realized, the procedures to be obeyed during the operation, the components and the space required by installation and auxiliary equipments, the presumable origin of components (nacional and international), including a preliminary list of building and operation costs are described. (author) [pt

  12. Classified installations for environmental protection subject to declaration. Tome 2

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Legislation concerning classified installations govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation, air pollution, water pollution, noise, wastes produced by installations, even aesthetic bad effects. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the secretary of state for the environment are listed in tome 2

  13. Samus Toroid Installation Fixture

    Energy Technology Data Exchange (ETDEWEB)

    Stredde, H.; /Fermilab

    1990-06-27

    The SAMUS (Small Angle Muon System) toroids have been designed and fabricated in the USSR and delivered to D0 ready for installation into the D0 detector. These toroids will be installed into the aperture of the EF's (End Toroids). The aperture in the EF's is 72-inch vertically and 66-inch horizontally. The Samus toroid is 70-inch vertically by 64-inch horizontally by 66-inch long and weighs approximately 38 tons. The Samus toroid has a 20-inch by 20-inch aperture in the center and it is through this aperture that the lift fixture must fit. The toroid must be 'threaded' through the EF aperture. Further, the Samus toroid coils are wound about the vertical portion of the aperture and thus limit the area where a lift fixture can make contact and not damage the coils. The fixture is designed to lift along a surface adjacent to the coils, but with clearance to the coil and with contact to the upper steel block of the toroid. The lift and installation will be done with the 50 ton crane at DO. The fixture was tested by lifting the Samus Toroid 2-inch off the floor and holding the weight for 10 minutes. Deflection was as predicted by the design calculations. Enclosed are sketches of the fixture and it relation to both Toroids (Samus and EF), along with hand calculations and an Finite Element Analysis. The PEA work was done by Kay Weber of the Accelerator Engineering Department.

  14. 46 CFR 11.470 - Officer endorsements as offshore installation manager.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Officer endorsements as offshore installation manager... Officer endorsements as offshore installation manager. (a) Officer endorsements as offshore installation manager (OIM) include: (1) OIM Unrestricted; (2) OIM Surface Units on Location; (3) OIM Surface Units...

  15. Heavy Precipitation impacts and emergency planning - developing applicable strategies for a metropolitan area

    Science.gov (United States)

    Kutschker, Thomas; Glade, Thomas

    2016-04-01

    Heavy rainfall in central Europe is one of the assumed effects of climate change, which occurs with large seasonal and regional differences in its magnitude. The extent of loss depends on natural parameters (e.g. topography and vegetation) as well as on socio-economic factors like urbanized and industrialized areas and population density. Dangerous cascade effects appear, if critical infrastructure like the electrical power supply is affected. In some cases mudflows and flash floods cause inundated or undercut roads and cause a high demand for fast and effective assistance of the authorities. The civil protection in Germany is based on a federal system with a bottom-up command-structure and responsibility to the local community. Commonly this responsibility is taken by the fire brigades and civil protection units of the community or district. After heavy rainfall in an urban area, numerous incidents and emergency calls appearing at a time are overstressing the human and technical resources of the fire brigades within the local authority frequently. In this study, a method of comprehensive evaluation of meteorological data and the operation data from local fire brigades shall be developed for the Rhine-Main-Area in order to identify particular affected spots of heavy rain and bundle resources of the fire brigades. It is to be found out if the study area contains regions with a particularly high exposure to heavy rain and high application numbers of the fire department and whether there is a relationship of rainfall and frequency of use. To evaluate particular local effects on the fire brigades capability, a brief analysis of the meteorological data provided by the German Meteorological Service (DWD) as well as the evaluation of the incident data of the affected fire brigades, is used to frame a realistic approach. In particular fire brigade operation data can be used accordingly to describe the intensity of the aftermath when heavy precipitation strikes a certain

  16. Offshore Wind Energy Cost Modeling Installation and Decommissioning

    CERN Document Server

    Kaiser, Mark J

    2012-01-01

    Offshore wind energy is one of the most promising and fastest growing alternative energy sources in the world. Offshore Wind Energy Cost Modeling provides a methodological framework to assess installation and decommissioning costs, and using examples from the European experience, provides a broad review of existing processes and systems used in the offshore wind industry. Offshore Wind Energy Cost Modeling provides a step-by-step guide to modeling costs over four sections. These sections cover: ·Background and introductory material, ·Installation processes and vessel requirements, ·Installation cost estimation, and ·Decommissioning methods and cost estimation.  This self-contained and detailed treatment of the key principles in offshore wind development is supported throughout by visual aids and data tables. Offshore Wind Energy Cost Modeling is a key resource for anyone interested in the offshore wind industry, particularly those interested in the technical and economic aspects of installation and decom...

  17. Installed capacity in New York

    International Nuclear Information System (INIS)

    Charlton, J.

    2006-01-01

    This presentation discussed capacity issues related to the New York Independent System Operator (NYISO). The NYISO's market volume was approximately $11 billion in 2005, and it was responsible for providing 32,075 MW of electricity at peak load to its users. Regulatory uncertainty is currently discouraging investment in new generating resources. All load serving entities are required to contract for sufficient capacity in order to meet their capacity obligations. Market participants currently determine capacity and energy revenues. The NYISO market allows suppliers to recover variable costs for providing ancillary services, and the economic value of the revenue source governs decisions made in the wholesale electricity market. The installed capacity market was designed as a spot auction deficiency auction. Phased-in demand curves are used to modify the installed capacity market's design. A sloped demand curve mechanism is used to value capacity above the minimum requirement for both reliability and competition. Participation in the day-ahead market enhances competition and exerts downward pressure on energy and ancillary service market prices. It was concluded that the market structures and design features of the installed capacity markets recognize the need for system reliability in addition to encouraging robust competition and recognizing energy price caps and regulatory oversights. tabs., figs

  18. Installation of foundation fieldbus to KUR

    International Nuclear Information System (INIS)

    Ishihara, Shinji; Fujita, Yoshiaki

    1999-11-01

    The instrumentation and control system for the research reactor in Research Reactor Institute, Kyoto University has been used for the safe and steady operation since the initial critical attainment in 1964. It has been modified and added many devices in the chance of increasing the reactor power from 1 MW to 5 MW, installing new experimental facilities or fitting to modified nuclear regulations. In order to avoid the unscheduled shutdown of the research reactor by cause the failure of the devices, most of instrumentation system was renewed in 1999. Operating the research reactor more safely and reliably, Supervisory Control Automation and Data Acquisition System which employed personal computers with the Windows NT operating system was added to the conventional instrumentation system, and the fieldbus system called Foundation Fieldbus was installed. Compared with conventional instrumentation system, each fieldbus system has some advantages. Many kinds of fieldbus systems have been developed and sold on the markets in some countries. Foundation Fieldbus standardizing international, which was able to use the devices made by multi-vendor was tentatively installed to study particular techniques about Foundation Fieldbus. The primary coolant flow rate, the temperature difference between the reactor tank inlet and outlet temperatures, the calorimetric power and the reactor power in nuclear instrumentation are monitored on human-machine interface devices on the fieldbus. The programmable logic controller is employed to control the information system for the reactor. This paper introduces Foundation Fieldbus installed. (author)

  19. Decommissioning and abandonment of offshore installations

    International Nuclear Information System (INIS)

    Side, J.C.

    1992-01-01

    To the onlooker surprising little thought was given at the project planning stage to the fate of offshore facilities once their production lifetimes had come to an end. Throughout the 1970s at least, international law required the complete removal of all structures and installations one disused or abandoned. Fishermen's organisations were led to believe that such installations would be entirely removed yet many of the designs of these show that removal was not much in the minds of the engineers or project management during the design stages. Changes in the text of the United Nations' Convention on the Law of the Sea and (by their widespread legal adoption) in customary international law may now permit partial removal of installations subject to important safeguards for navigation, the environment and other users of the sea. Of the North Sea states at least one has adopted policies that will minimise the cost associated with offshore decommissioning and abandonment and both the UK and Norway are adopting legislation which will provide for a case by case approach to the decommissioning and abandonment of offshore facilities and allow partial removal options. There has thus been a recent and significant change in approach to the abandonment of offshore oil and gas installations. This chapter reviews the development of abandonment laws and policies, outlines the available removal options, and provides a consideration of the environmental and fishery implications of these for the North Sea. (Author)

  20. Changes in Temporary Disability Reporting Following the Implementation of the Army Medical Readiness Transformation.

    Science.gov (United States)

    Sapp, Jason E; Cody, Matthew J; Douglas, Kevin M

    2018-02-07

    In November 2014, the U.S. Army held a readiness summit to address concerns about the accuracy of medical reporting systems. At the time, soldiers on temporary disability were tracked as a medical readiness classification (MRC) 3A or 3B. MRC 3A soldiers had a medical condition with recovery expected within 30 d and MRC 3B soldiers were expected to take longer than 30 d to recover. Both groups were considered "non-available" and presumably non-deployable. Starting June 1, 2016, with the implementation of the Army Medical Readiness Transformation, soldiers on temporary disability longer than 14 d began to be reported as MRC 3s and are considered "non-deployable." The purpose of this study is to compare the number of soldiers on temporary disability previously reported as MRC 3A and 3B to the number listed as MRC 3 under the new reporting system for a light infantry brigade and to quantify the types and relative percentage of medical conditions leading to temporary disability under the new system. This cross-sectional analysis was conducted between January 1 and December 31, 2016 at Fort Carson, Colorado and included all soldiers assigned to Second Brigade, Fourth Infantry Division. We calculated the average number and proportion of soldiers on temporary disability at any one time for the period prior to implementation of the new reporting system (January 1 through May 31, 2016) and compared this to the period after implementation on June 1, 2016. The difference between the two independent proportions was calculated along with the lower and upper limits of the 95% confidence interval for the difference. Between January 1 and May 31, 2016, the average number of soldiers on temporary disability at any one time was 186, accounting for 4.3% of the authorized unit strength. After June 1, 2016, the average number increased to 244 or 5.7%. The difference in the proportion of temporary profiles was 1.4% (95% confidence interval 0.43-2.3%). From June 1 through December 31

  1. Y2K bug and nuclear installations; Le passage a l'an 2000 sur les installations nucleaires

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    1999-10-01

    Most nuclear installations except power plants, will be shut down on the eve of new year. By september 1999, EDF will have realized all the corrective and preventive actions that are necessary to pass Y2K. CEA has committed to present to safety authorities a complete report concerning preventive actions in its own basic nuclear installations. Safety authorities plan to organize a crisis center in order to face any problem. (A.C.)

  2. The installation and dismantling of electrolytic cells

    International Nuclear Information System (INIS)

    Galushkin, N.V.

    1995-01-01

    This chapter of monograph is devoted to construction of aluminium electrolytic cells, their installation and dismantling. Therefore, the general characteristic and classification of aluminium electrolytic cells was considered. The anode and cathode structure was studied. The lining of cathode casing, the process of collection of anode gases, electrolytic cell cover, and electrical insulation was studied as well. The installation and dismantling of aluminium electrolytic cells was described.

  3. 30 CFR 77.509 - Transformers; installation and guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a... feet from any energized parts, casings, or wiring. (b) Transformer stations shall be enclosed to...

  4. 47 CFR 80.903 - Inspection of radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... ship passes the inspection, the technician will issue a Communications Act Safety Radiotelephony... 47 Telecommunication 5 2010-10-01 2010-10-01 false Inspection of radiotelephone installation. 80... Passenger Boats § 80.903 Inspection of radiotelephone installation. Every vessel subject to Part III of...

  5. Construction of a differential thermal analysis installation; Realisation d'une installation d'analyse thermique differentielle

    Energy Technology Data Exchange (ETDEWEB)

    Branche, G; Chantret, F [Commissariat a l' Energie Atomique, Saclay (France).Centre d' Etudes Nucleaires

    1959-07-01

    The authors are indicating the characteristics of a D.T.A. installation they built. Experimental rooms, ovens, thermal regulation, recording methods are thoroughly described, with outlining of the requirements to obtain a high sensitivity. Numerous D.T.A. curves relating to argillaceous substances, bituminous shales, and uraniferous compounds are given. (author) [French] Les auteurs donnent les caracteristiques de l'installation d'Analyse Thermique Differentielle qu'ils ont construits. Ils decrivent en detail les chambres d'experiences, les fours, la regulation thermique, l'enregistrement, en insistant sur les conditions necessaires pour obtenir une sensibilite elevee. Ils donnent de nombreuses courbes differentielles relatives des produits argileux, des schistes bitumineux et des composes uraniferes. (auteur)

  6. 30 CFR 57.4131 - Surface fan installations and mine openings.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Surface fan installations and mine openings. 57... Fire Prevention and Control Prohibitions/precautions/housekeeping § 57.4131 Surface fan installations... stored within 100 feet of mine openings or within 100 feet of fan installations used for underground...

  7. RADAR 2020. Outline of important future developments for installation businesses

    International Nuclear Information System (INIS)

    Pleijster, F.; Braaksma, R.; Van Hoorik, P.; Pikaart, A.; Zwinkels, A.; Muizer, A.

    2010-11-01

    This RADAR focuses on future trends in the broad field of the installation industry with the aim of developing supporting policy for the installation businesses based on the objectives of UNETO-NVO and OTIB. Trends that can be earmarked as relevant for the installation industry are: Social development, Economic development, Technological development, Organizational development, Economic development, and Political development. In this framework, attention is mainly paid to the developments in the following working areas of the installation industry: Climate Engineering, Electrical Engineering, Sanitary engineering, and ICT. [nl

  8. Installation Strategy for the LHC Main Dipoles

    CERN Multimedia

    Fartoukh, Stephane David

    2004-01-01

    All positions in the LHC machine are not equivalent in terms of beam requirements on the geometry and the field quality of the main dipoles. In the presence of slightly or strongly out-of tolerance magnets, a well-defined installation strategy will therefore contribute to preserve or even optimize the performance of the machine. Based on the present status of the production, we have anticipated a list of potential issues (geometry, transfer function, field direction and random b3) which, combined by order of priority, have been taken into account to define a simple but efficient installation algorithm for the LHC main dipoles. Its output is a prescription for installing the available dipoles in sequence while reducing to an absolute minimum the number of holes required by geometry or FQ issues.

  9. IPPC installations in France and limit values of emission

    International Nuclear Information System (INIS)

    Soleille, S.

    2004-05-01

    The IPPC directive of the 24 September 1996 asked for the main european industrial installations an authorization. This authorization fixes limit values for pollutant emissions. In France, the main industrial installations are controlled since many years in the framework of the regulation on classified installations for the environment protection (ICPE). This report compares the limit values of emissions for the national and prefectorial orders and for the IPPC directive. (A.L.B.)

  10. Analysis of Army Transformation and the Effects on Customer Ordering Behavior

    National Research Council Canada - National Science Library

    Colacicco, Joseph M

    2007-01-01

    ... behavior, and other potential sources of variance in ordering behavior. The subproblems were answered through an examination of the supply document histories of two Brigades, one legacy Brigade (Unit 1...

  11. The dismantling of nuclear installations

    International Nuclear Information System (INIS)

    Lacoste, A.C.; Duthe, M.; Mignon, H.; Lambert, F.; Pradel, Ph.; Hillewaere, J.P.; Dupre la Tour, St.; Mandil, C.; Weil, L.; Eickelpasch, N.; Finsterwalder, L.

    1997-01-01

    for nuclear installations, the dismantling is an important part of their exploitation. The technology of dismantling is existing and to get a benefit from the radioactive decay, it seems more easy for operating company such E.D.F. to wait for fifty years before dismantling. But in order to get the knowledge of this operation, the Safety Authority wanted to devote this issue of 'Controle'to the dismantling method. This issue includes: the legal aspects, the risks assessment, the dismantling policy at E.D.F., the site of Brennilis (first French experience of dismantling), the dismantling techniques, the first dismantling of a fuel reprocessing plant, comparison with classical installations, economic aspect, some German experiences, the cleansing of the american site of Handford. (N.C.)

  12. The nuclear installations face to their environment

    International Nuclear Information System (INIS)

    Rieu, Ch.; Berge-Thierry, C.; Duval, C.; Bonnet, Ch.; Gaubert, B.; Riffard, Th.; Greffier, G.; Cervantes, J.C.; Le Breton, F.; Clement, C.; Charbonnier, R.; Andreani, A.M.; Maubert, H.; Maisonneuve, A.

    2002-01-01

    This dossier deals with protection of nuclear installations against external risks. The articles come from the presentations of the Conference on 'Nuclear installations and their environment', held by the 'Safety and Environment Protection' Section of the French Nuclear Energy Society on October fifteenth 2002. Floods, earthquakes, winter cold, snow-falls, wind, fires are the main natural risks taken into account. Risks from industrial environment and communication lines are also considered. (author)

  13. DOD low energy model installation program

    International Nuclear Information System (INIS)

    Fournier, D.F. Jr.

    1993-01-01

    The Model Low Energy Installation Program is a demonstration of an installation-wide, comprehensive energy conservation program that meets the Department of Defense (DoD) energy management goals of reducing energy usage and costs by at least 20%. It employs the required strategies for meeting these goals, quantifies the environmental compliance benefits resulting from energy conservation and serves as a prototype for DoD wide application. This project will develop both analysis tools and implementation procedures as well as demonstrate the effectiveness of a comprehensive, coordinated energy conservation program based on state-of-the-art technologies. A military installation is in reality a small to medium sized city. It generally has a complete utilities infrastructure including water supply and distribution, sewage collection and treatment, electrical supply and distribution, central heating and cooling plants with thermal distribution, and a natural gas distribution system. These utilities are quite extensive and actually consume about 10-15% of the energy on the facility not counting the energy going into the central plants

  14. Some suggestions based on the instrumentation installation experience at RAPP

    International Nuclear Information System (INIS)

    Raghunath, M.R.; Singh, S.; Jain, V.K.

    1977-01-01

    Suggestions regarding installation of reactor instrumentation have been made based on the instrumentation installation experience at the Rajasthan Atomic Power Plant. It has been mentioned that the instrumentation installation work has to proceed simultaneously with that of the heavy equipment and piping errection work, to meet the commissioning target dates. (S.K.K.)

  15. A dynamic system for ATLAS software installation on OSG grid sites

    International Nuclear Information System (INIS)

    Zhao, X; Maeno, T; Wenaus, T; Leuhring, F; Youssef, S; Brunelle, J; De Salvo, A; Thompson, A S

    2010-01-01

    A dynamic and reliable system for installing the ATLAS software releases on Grid sites is crucial to guarantee the timely and smooth start of ATLAS production and reduce its failure rate. In this paper, we discuss the issues encountered in the previous software installation system, and introduce the new approach, which is built upon the new development in the areas of the ATLAS workload management system (PanDA), and software package management system (pacman). It is also designed to integrate with the EGEE ATLAS software installation framework. In the new system, ATLAS software releases are packaged as pacball, a uniquely identifiable and reproducible self-installing data file. The distribution of pacballs to remote sites is managed by ATLAS data management system (DQ2) and PanDA server. The installation on remote sites is automatically triggered by the PanDA pilot jobs. The installation job payload connects to a central ATLAS software installation portal, making the information of installation status easily accessible across OSG and EGEE Grids. The issues encountered in running the new system in production, and our future plan for improvement, will also be discussed.

  16. Intelligence Support to Urban Operations

    Science.gov (United States)

    2015-12-01

    one Russian brigade in Chechnya in 1995 show that 15 percent of the brigade was down with hepatitis at one time. Dirty water was the main culprit in...Historical Series), Washington, DC: U.S. Government Printing Office, 1972. “Medical records of one Russian Brigade in Chechnya show that 15 percent of...Jorgensen, “Viral Hepatitis and the Russian War in Chechnya ,” Army Medical Department Journal, May–June 1997, 2–4. Available online at the Foreign

  17. Advanced Measuring (Instrumentation Methods for Nuclear Installations: A Review

    Directory of Open Access Journals (Sweden)

    Wang Qiu-kuan

    2012-01-01

    Full Text Available The nuclear technology has been widely used in the world. The research of measurement in nuclear installations involves many aspects, such as nuclear reactors, nuclear fuel cycle, safety and security, nuclear accident, after action, analysis, and environmental applications. In last decades, many advanced measuring devices and techniques have been widely applied in nuclear installations. This paper mainly introduces the development of the measuring (instrumentation methods for nuclear installations and the applications of these instruments and methods.

  18. Optimal installation program for reprocessing plants

    International Nuclear Information System (INIS)

    Kubokawa, Toshihiko; Kiyose, Ryohei

    1976-01-01

    Optimization of the program of installation of reprocessing plants is mathematically formulated as problem of mixed integer programming, which is numerically solved by the branch-and-bound method. A new concept of quasi-penalty is used to obviate the difficulties associated with dual degeneracy. The finiteness of the useful life of the plant is also taken into consideration. It is shown that an analogous formulation is possible for the cases in which the demand forecasts and expected plant lives cannot be predicted with certainty. The scale of the problem is found to have kN binary variables, (k+2)N continuous variables, and (k+3)N constraint conditions, where k is the number of intervals used in the piece-wise linear approximation of a nonlinear objective function, and N the overall duration of the period covered by the installation program. Calculations are made for N=24 yr and k=3, with the assumption that the plant life is 15 yr, the plant scale factor 0.5, and the maximum plant capacity 900 (t/yr). The results are calculated and discussed for four different demand forecasts. The difference of net profit between optimal and non-optimal installation programs is found to be in the range of 50 -- 100 M$. The pay-off matrix is calculated, and the optimal choice of action when the demand cannot be forecast with certainty is determined by applying Bayes' theory. The optimal installation program under such conditions of uncertainty is obtained also with a stochastic mixed integer programming model. (auth.)

  19. The dismantling of CEA nuclear installations

    International Nuclear Information System (INIS)

    Piketty, Laurence

    2016-03-01

    After having indicated locations of French nuclear installations which are currently being dismantled (about 30 installations), and recalled the different categories of radioactive wastes with respect to their activity level and the associated storage options, this article gives an overview of various aspects of dismantling, more precisely in the case of installations owned and managed by the CEA. These operations comprise the dismantling itself, the recovery and packaging of wastes, old effluents and spent fuels. The organisation and responsible departments within the CEA are presented, and the author outlines some operational problematic issues met due to the age of installations (traceability of activities, regulation evolutions). The issue of financing is then discussed, and its uncertainties are outlined. The dismantling strategy within the CEA-DEN is described, with reference to legal and regulatory frameworks. The next parts of the article address the organisation and the economic impact of these decontamination and dismantling activities within the CEA-DEN, highlight how R and D and advanced technology are a support to this activities as R and D actions address all scientific and technical fields of nuclear decontamination and dismantling. An overview of three important dismantling works is proposed: Fontenay-aux-Roses, the Marcoule CEA centre (a reference centre in the field of nuclear dismantling and decontamination) and the Grenoble CEA centre (reconversion in R and D activities in the fields of technologies of information, of communication, technologies, for health, and in renewable energies). The last part addresses the participation to the Strategic Committee of the Nuclear Sector (CSFN)

  20. Design and installation package for a solar powered pump

    Science.gov (United States)

    1978-01-01

    The design and installation procedures of a solar powered pump developed by Calmac Manufacturing Company are presented. Subsystem installation, operation and maintenance requirements, subsystem performance specifications, and detailed design drawings are included.

  1. 46 CFR 76.27-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.27-15 Section 76.27-15... EQUIPMENT Electric Fire Detecting System, Details § 76.27-15 Operation and installation. (a) The system... system. (e) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  2. Listed installations for environmental protection in hospitals

    International Nuclear Information System (INIS)

    Mullot, J.U.; Chaulet, J.F.; Thual, A.; Lafon, M.

    1999-01-01

    This work deals with the implications of different French rules and regulations concerning the environmental protection in hospitals. A special place is given to listed installations for environmental protection, because of their importance. A summary of important regulatory texts is presented concerning these installations, and also an inventory of installations or activities concerned, and the definition of the necessary procedures. Some ideas are also given about the much needed creation of an 'environmental network' inside hospitals, in order to cope with these concerns. Then, we briefly deal with more recent developments concerning the environmental protection, which will, no doubt, extend to hospitals, such as the French water law, air law, and procedures for the management of medical waste. Finally, the stakes of environmental decisions in hospitals and the chemist's place in these decisions are debated. (authors)

  3. Leukaemia near british nuclear installations

    International Nuclear Information System (INIS)

    Hubert, D.

    1991-01-01

    An excess of childhood leukaemia has been seen near some British nuclear installations, especially near the Sellafield reprocessing plant. The same result was found in a more general study including a large number of nuclear sites. Similar studies made in USA, Canada and France have been negative. Moreover, epidemiological studies made in England have discovered other childhood leukaemia clusters in areas far from nuclear facilities, and especially near potential sites of nuclear installations. Several explanations are suggested but no definite conclusion is yet possible. Doses from radioactive releases seem to be too low to account for the additional deaths from leukaemia by environmental contamination. A virus activation, which might be associated with population influx into rural isolated areas, has been considered. The hypothesis of genetic mutation induced by ionising radiation in the fathers of children with leukaemia has been made because a higher risk of leukaemia was observed for children of fathers employed at Sellafield. No firm conclusion is possible considering the small number of observed cases and the lack of excess leukaemias in the offspring of Hiroshima and Nagasaki survivors. The possibility of internal contamination, chemicals or even radon is discussed as other causes. Studies in progress might allow to find an answer to the problem of leukaemia in the vicinity of British nuclear installations [fr

  4. Nuclear Installations Act 1969

    International Nuclear Information System (INIS)

    1969-01-01

    The purpose of this Act is to amend the Nuclear Installations Act 1965 to bring it into full compliance with the international conventions on nuclear third party liability to which the United Kingdom is a Signatory, namely, the Paris Convention, the Brussels Supplementary Convention and the Vienna Convention. (NEA) [fr

  5. Questions for the nuclear installations inspectorate

    International Nuclear Information System (INIS)

    Conroy, C.; Flood, M.; MacRory, R.; Patterson, W.C.

    1976-01-01

    The responsibilities of the Nuclear Installations Inspectorate are considered, and the responsibilities of other bodies for (a) reprocessing and enrichment, and (b) security. Questions for the Nuclear Installations Inspectorate are then set out under the following heads: general (on such topics as vandalism, sabotage, threats, security, reactor incidents); magnox reactors; corrosion; advanced gas-cooled reactor; steam generating heavy water reactor; fast breeder reactor; reproces-sing and waste. Most of the questions are concerned with technical problems that have been reported or might possibly arise during construction or operation, affecting the safety of the reactor or process. (U.K.)

  6. First DT+RPC chambers installation round in the UX5 cavern

    CERN Multimedia

    Jesus Puerta-Pelayo

    2007-01-01

    DT+RPC packages corresponding to sectors 1 and 7 of the barrel region cannot be installed on surface, since the lowering gantry from SX5 to UX5 uses their gaps to hold the wheels. Therefore this installation has to be carried out in the cavern. These pictures illustrate the first installation round on YB+2 right after the lowering. A total of 8 chambers were successfully installed in 2 days.

  7. Professional installation of overvoltage protection devices. The most common installation errors; Fachgerechte Installation von Ueberspannungsschutzgeraeten. Die haeufigsten Installationsfehler

    Energy Technology Data Exchange (ETDEWEB)

    Gmelch, L. [Dehn und Soehne GmbH und Co. KG, Neumarkt (Germany)

    2007-07-01

    Increasingly sensitive electronic equipment and high demands on plant and system availability necesstate effective protection against lightning and overvoltage. Apart from the measures that must be taken already in the projecting phase in order to minimize the risk of interferences, disturbances and destruction of plants and systems, there are also some basic principles that must be observed when installing overvoltage protection equipment. If these are neglected, the protective function of overvoltage protection systems may be seriously impaired. (orig.)

  8. 46 CFR 76.35-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.35-15 Section 76.35-15... EQUIPMENT Manual Alarm System, Details § 76.35-15 Operation and installation. (a) The system shall be so... system. (d) All wiring and electrical circuits and equipment shall meet the applicable requirements of...

  9. 46 CFR 76.25-35 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.25-35 Section 76.25-35... EQUIPMENT Automatic Sprinkling System, Details § 76.25-35 Operation and installation. (a) The system shall... all its components shall be used for no other purpose. (h) All wiring and electrical circuits and...

  10. 46 CFR 76.30-15 - Operation and installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 3 2010-10-01 2010-10-01 false Operation and installation. 76.30-15 Section 76.30-15... EQUIPMENT Pneumatic Fire Detecting System, Details § 76.30-15 Operation and installation. (a) The system... that it may be incorporated with the manual alarm system. (e) All wiring and electrical circuits and...

  11. 46 CFR 182.430 - Engine exhaust pipe installation.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Engine exhaust pipe installation. 182.430 Section 182... 100 GROSS TONS) MACHINERY INSTALLATION Specific Machinery Requirements § 182.430 Engine exhaust pipe... equipment might come in contact with an exhaust pipe. (b) Exhaust gas must not leak from the piping or any...

  12. Installation of a second superconducting wiggler at SAGA-LS

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyasu, T., E-mail: kaneyasu@saga-ls.jp; Takabayashi, Y.; Iwasaki, Y.; Koda, S. [SAGA Light Source, 8-7 Yayoigaoka, Tosu 841-0005 (Japan)

    2016-07-27

    The SAGA Light Source is a synchrotron radiation facility consisting of a 255 MeV injector linac and a 1.4 GeV storage ring with a circumference of 75.6 m. A superconducting wiggler (SCW) with a peak magnetic field of 4 T has been routinely operating for generating hard X-rays since its installation in 2010. In light of this success, it was decided to install a second SCW as a part of the beamline construction by Sumitomo Electric Industries. To achieve this, machine modifications including installation of a new magnet power supply, improvement of the magnet control system, and replacement of the vacuum chambers in the storage ring were carried out. Along with beamline construction, installation and commissioning of the second SCW are scheduled to take place in 2015.

  13. Physical protection of nuclear installations

    International Nuclear Information System (INIS)

    Toepfer, K.

    1989-01-01

    This contribution investigates the possible danger and the legal basis of physical protection and explains the current, integrated system provided for, as well as the underlying possible scenarios of an assault: (1) by a violent crowd of aggressors outside the installation, (2) by a small group of aggressors outside the installation, (3) by a person allowed to enter (internal assault). The physical protection system supplements the internal safety measures to enhance protection against hypothetical and possible acts of terrorism or other criminal assault. The system covers external and internal controlled areas, access monitoring, physical protection control room and service, security checks of the personnel, and activities to disclose sabotage. Some reflections on the problem field between security controls and the constitutional state conclude this contribution. (orig./HSCH) [de

  14. Installation package for a sunspot cascade solar water heating system

    Science.gov (United States)

    1980-01-01

    Solar water heating systems installed at Tempe, Arizona and San Diego, California are described. The systems consist of the following: collector, collector-tank water loop, solar tank, conventional tank, and controls. General guidelines which may be utilized in development of detailed installation plans and specifications are provided along with instruction on operation, maintenance, and installation of solar hot water systems.

  15. Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations

    Science.gov (United States)

    2016-04-04

    still slightly more expensive to install than utility-scale PV, distributed solar installation costs decreased in half since 2008, and this power source...has been privately purchased and installed . However, utility companies are beginning to purchase and install solar panel systems on homes and...front installation and hardware costs. This new initiative accounted for more than 72 % of U.S. residential solar installations in 2Ol4. Over the past

  16. Laser ionization installation for measurement of atomic beam parameters

    CERN Document Server

    Tukhlibaev, O; Khalilov, E E; Alimov, U Z

    2002-01-01

    The design of the laser ionization installation for determination of the atomic beam intensity, density and spatial structure is described. The method of the atoms laser resonance staged photoionization is applied in the installation. The above installation consists of two lasers on the dyestuffs, the atomizer, the ionization system and the ion signals registration system. The results of studies on the spatial structure of the In atoms beam are presented. The proposed method provides for the spatial resolution at the level of 10-100 mu m

  17. Volcanic Hazards in Site Evaluation for Nuclear Installations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2012-10-15

    This publication provides comprehensive and updated guidance for site evaluation in relation to volcanic hazards. It includes recommendations on assessing the volcanic hazards at a nuclear installation site, in order to identify and characterize, in a comprehensive manner, all potentially hazardous phenomena that may be associated with future volcanic events. It describes how some of these volcanic phenomena may affect the acceptability of the selected site, resulting in exclusion of a site or determining the corresponding design basis parameters for the installation. This Safety Guide is applicable to both existing and new sites, and a graded approach is recommended to cater for all types of nuclear installations. Contents: 1. Introduction; 2. Overview of volcanic hazard assessment; 3. General recommendations; 4. Necessary information and investigations (database); 5. Screening of volcanic hazards; 6. Site specific volcanic hazard assessment; 7. Nuclear installations other than nuclear power plants; 8. Monitoring and preparation for response; 9. Management system for volcanic hazard assessment; Annex I: Volcanic hazard scenarios; Annex II: Worldwide sources of information.

  18. Safety requirements and radiological protection for ore installations

    International Nuclear Information System (INIS)

    2003-06-01

    This norm establishes the safety and radiological protection requirements for mining installations which manipulates, process and storing ores, raw materials, steriles, slags and wastes containing radionuclides of the uranium and thorium natural series, simultaneously or separated, and which can cause undue exposures to the public and workers, at anytime of the functioning or pos operational stage. This norm applies to the mining installations activities, suspended or which have ceased their activities before the issue date of this norm, destined to the mining, physical, chemical and metallurgical processing, and the industrialization of raw materials and residues containing associated radionuclides from the natural series of uranium and thorium, including the stages of implantation, operation and decommissioning of the installation

  19. A method of installing a reactor container

    International Nuclear Information System (INIS)

    Hayashi, Kenji; Murakawa, Hisao.

    1975-01-01

    Object: To achieve exact installation of a reactor container at a site. Structure: A pole is set upright at the center of a cylindrical base portion, a plurality of beams are disposed around the pole in a radial fashion to form a cone, a plurality of steel plates are mounted successively around the cone through a ring, and the steel plates are welded to each other to assemble and install a reactor container at the same time. (Kamimura, M.)

  20. Study on installation of the submersible mixer

    International Nuclear Information System (INIS)

    Tian, F; Shi, W D; He, X H; Xu, Y H; Jiang, H

    2013-01-01

    Study on installation of the submersible mixer for sewage treatment has been limited. In this article, large-scale computational fluid dynamics software FLUENT6.3 was adopted. ICEM software was used to build an unstructured grid of sewage treatment pool. After that, the sewage treatment pool was numerically simulated by dynamic coordinate system technology and RNG k-ε turbulent model and PIOS algorithm. Agitation pools on four different installation location cases were simulated respectively, and the external characteristic of the submersible mixer and the velocity cloud of the axial section were respectively comparatively analyzed. The best stirring effect can be reached by the installation location of case C, which is near the bottom of the pool 600 mm and blade distance the bottom at least for 200 mm wide and wide edge and narrow edge distance by 4:3. The conclusion can guide the engineering practice

  1. Decommissioning of offshore installations

    Energy Technology Data Exchange (ETDEWEB)

    Oeen, Sigrun; Iversen, Per Erik; Stokke, Reidunn; Nielsen, Frantz; Henriksen, Thor; Natvig, Henning; Dretvik, Oeystein; Martinsen, Finn; Bakke, Gunnstein

    2010-07-01

    New legislation on the handling and storage of radioactive substances came into force 1 January 2011. This version of the report is updated to reflect this new regulation and will therefore in some chapters differ from the Norwegian version (see NEI-NO--1660). The Ministry of the Environment commissioned the Climate and Pollution Agency to examine the environmental impacts associated with the decommissioning of offshore installations (demolition and recycling). This has involved an assessment of the volumes and types of waste material and of decommissioning capacity in Norway now and in the future. This report also presents proposals for measures and instruments to address environmental and other concerns that arise in connection with the decommissioning of offshore installations. At present, Norway has four decommissioning facilities for offshore installations, three of which are currently involved in decommissioning projects. Waste treatment plants of this kind are required to hold permits under the Pollution Control Act. The permit system allows the pollution control authority to tailor the requirements in a specific permit by evaluating conditions and limits for releases of pollutants on a case-to-case basis, and the Act also provides for requirements to be tightened up in line with the development of best available techniques (BAT). The environmental risks posed by decommissioning facilities are much the same as those from process industries and other waste treatment plants that are regulated by means of individual permits. Strict requirements are intended to ensure that environmental and health concerns are taken into account. The review of the four Norwegian decommissioning facilities in connection with this report shows that the degree to which requirements need to be tightened up varies from one facility to another. The permit for the Vats yard is newest and contains the strictest conditions. The Climate and Pollution Agency recommends a number of measures

  2. The Swiss nuclear installations. Annual report 1993

    International Nuclear Information System (INIS)

    1994-08-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK's supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration of final disposal facilities for radwaste and the interim radwaste storage facilities in Switzerland. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants' proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1993, is judged as good by HSK. (author) 10 figs., 11 tabs

  3. The Swiss nuclear installations. Annual report 1994

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-06-01

    Surveillance of the Swiss nuclear installations with regard to nuclear safety, including radiation protection, is among the tasks of the Swiss Federal Nuclear Safety Inspectorate (HSK). Five nuclear power plants are operational in Switzerland: the three units Beznau I and II and Muehleberg with electrical capacities in the range of 300 to 400 MWe, and the two units Goesgen and Leibstadt with capacities between 900 and 1200 MWe. These are light water reactors; at Beznau and Goesgen of the PWR type, and at Muehleberg and Leibstadt of the BWR type. Research reactors of thermal capacities below 10 MWth are operational at the Paul Scherrer Institute (PSI), at the Swiss Federal Institute of Technology Lausanne and at the University of Basel. Further subject to HSK`s supervision are all activities at PSI involving nuclear fuel or ionizing radiation, the shut-down experimental reactor of Lucens, the exploration, in Switzerland, of final disposal facilities for radwaste and the interim radwaste storage facilities. The report first deals with the nuclear power and covers, in individual sections, the aspects of installation safety, radiation protection as well as personnel and organization, and the resulting overall impression from the point of view of HSK. In chapter 5, the corresponding information is given for research installations. Chapter 6, on radwaste disposal, is dedicated to the treatment of waste, waste from reprocessing, interim storage and exploration by NAGRA. In chapter 7, the status of emergency planning in the nuclear power plants` proximity is reported. Certificates issued for the transport of radioactive materials are dealt with in chapter 8. Finally chapter 9 goes into general questions relating to the safety of nuclear installations. All in all, the safety of operation of the Swiss nuclear installations, in the period of 1994, is judged as good by HSK. (author) 11 figs., 13 tabs.

  4. Colonel Stefan Ilieff [In Bulgarian

    Directory of Open Access Journals (Sweden)

    V. Dimov

    2013-06-01

    Full Text Available On 26 March 1917 colonel Stefan Ilieff, a commander of the 15th Infantry Lom regiment (Belogradchik, was killed on the battlefield at Pelister, near Bitolja (Macedonia. The text of V. Dimov, a war correspondent at the 6th Infantry Bdin division, was published in the magazine “Otechestvo” (Homeland, Volume 4, Number 45, 11 November 1917.

  5. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    Science.gov (United States)

    De Salvo, A.; Kataoka, M.; Sanchez Pineda, A.; Smirnov, Y.

    2015-12-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original Workload Management Service (WMS) and the new PanDA modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over Wide Area Network. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation Database is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system is in production for ATLAS since 2013, having as main sites in HA the INFN Roma Tier 2 and the CERN Agile Infrastructure. The Light Job Submission Framework for Installation (LJSFi) v2 engine is directly interfacing with PanDA for the Job Management, the Atlas Grid Information System (AGIS) for the site parameter configurations, and CVMFS for both core components and the installation of the software itself. LJSFi2 is also able to use other plugins, and is essentially Virtual Organization (VO) agnostic, so can be directly used and extended to cope with the requirements of any Grid or Cloud enabled VO. In this work we will present the architecture, performance, status and possible evolutions to the system for the LHC Run2 and beyond.

  6. Installing and Scaling out Ubuntu Enterprise Cloud in Virtual Environment

    DEFF Research Database (Denmark)

    Pantić, Zoran; Ali Babar, Muhammad

    This document contains the supplemental material to the book “Guidelines for Building a Private Cloud Infrastructure”. This document provides guidance on how to install Ubuntu Enterprise Cloud in virtual environment, and afterwards how to scale out when needed. The purpose of this supplemental book...... is to provide a practical, step-by-step, detailed guide on how to dimension and install the machines and network. Some initial steps of configuring the cloud are also covered. The installation is performed in a virtual environment based on Windows 7 and VMware Workstation 7. The cloud installation is performed...... cloud, both using the command line tools, and GUI based tool HybridFox....

  7. Improved gas installations and services. Phase 1: Analysis project. Part report

    International Nuclear Information System (INIS)

    Nielsen, K.J.

    1996-05-01

    As Danish gas companies receive a large number of complaints related to the installation and operation of gas installations it was suggested that a course for personnel should be established in order to raise the standard of services and installation requirements. The first phase of the described project was to evaluate the quality of the gas installers' services so as to determine which aspects of installation and services should be emphasized during such a course. Interviews were carried out and questionnaires (illustrated within the document) sent out to installaters etc. Recommendations include that the level of information given to customers should be raised, also in relation to maintenance, and that installation should be improved. Analyses of the degree of customers' satisfaction, of the nature of the quality of services etc. expected, subjects for further training in this area and details of the training system are dealt with

  8. The ATLAS Software Installation System v2: a highly available system to install and validate Grid and Cloud sites via Panda

    CERN Document Server

    De Salvo, Alessandro; The ATLAS collaboration; Sanchez, Arturo; Smirnov, Yuri

    2015-01-01

    The ATLAS Installation System v2 is the evolution of the original system, used since 2003. The original tool has been completely re-designed in terms of database backend and components, adding support for submission to multiple backends, including the original WMS and the new Panda modules. The database engine has been changed from plain MySQL to Galera/Percona and the table structure has been optimized to allow a full High-Availability (HA) solution over WAN. The servlets, running on each frontend, have been also decoupled from local settings, to allow an easy scalability of the system, including the possibility of an HA system with multiple sites. The clients can also be run in multiple copies and in different geographical locations, and take care of sending the installation and validation jobs to the target Grid or Cloud sites. Moreover, the Installation DB is used as source of parameters by the automatic agents running in CVMFS, in order to install the software and distribute it to the sites. The system i...

  9. Licensing system for primary category radioactive installations

    International Nuclear Information System (INIS)

    Ramirez Riquelme, Angelica Beatriz

    1997-01-01

    The development of a licensing system for primary category radioactive installations is described, which aims to satisfy the needs of the Chilean Nuclear Energy Commission's Department of Nuclear and Radiological Safety, particularly the sections for Licensing Outside Radioactive Installations and Safety Control. This system involves the identification, control and inspection of the installations, their personnel and connected activities, for the purpose of protecting the population's health and the environment. Following the basic cycle methodology, a systems analysis and engineering stage was prepared, establishing the functions of the system's elements and defining the requirements, based on interviews with the users. This stage was followed by the design stage, focusing on the data structure, the software architecture and the procedural detail. The codification stage followed, which translated the design into legible machine-readable format. In the testing stage, the entries that were defined were proven to produce the expected data. Finally and operational and maintenance stage was developed, when the system was installed and put to use. All the above generated a useful system for the Licensing section of the Department of Nuclear and Radiological Safety, since it provides faster and easier access to information. A project is described that introduces new development tools in the Computer department following standards established by the C.CH.E.N. (author)

  10. Using the Spatial Distribution of Installers to Define Solar Photovoltaic Markets

    Energy Technology Data Exchange (ETDEWEB)

    O' Shaughnessy, Eric [National Renewable Energy Lab. (NREL), Golden, CO (United States); Nemet, Gregory F. [Univ. of Wisconsin, Madison, WI (United States); Darghouth, Naim [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-01

    Solar PV market research to date has largely relied on arbitrary jurisdictional boundaries, such as counties, to study solar PV market dynamics. This paper seeks to improve solar PV market research by developing a methodology to define solar PV markets. The methodology is based on the spatial distribution of solar PV installers. An algorithm is developed and applied to a rich dataset of solar PV installations to study the outcomes of the installer-based market definitions. The installer-based approach exhibits several desirable properties. Specifically, the higher market granularity of the installer-based approach will allow future PV market research to study the relationship between market dynamics and pricing with more precision.

  11. Managing for safety at nuclear installations

    International Nuclear Information System (INIS)

    1996-01-01

    This publication, by the Health and Safety Executive's (HSE's) Nuclear Safety Division (NSD), provides a statement of the criteria the Nuclear Installations Inspectorate (NII) uses to judge the adequacy of any proposed or existing system for managing a nuclear installation in so far as it affects safety. These criteria have been developed from the basic HSE model, described in the publication Successful health and safety management that applies to industry generally, in order to meet the additional needs for managing nuclear safety. In addition, the publication identifies earlier studies upon which this work was based together with the key management activities and outputs. (Author)

  12. Natural gas fuelling stations installation code

    Energy Technology Data Exchange (ETDEWEB)

    Barrigar, C; Burford, G; Adragna, M; Hawryn, S

    2004-07-01

    This Canadian Standard applies to natural gas fuelling stations that can be used for fleet and public dispensing operations. This document is divided into 11 sections that address the scope of the Standard; definitions and reference publications; general requirements; compressors; storage; dispensing; flow control devices; storage vessel dispatch and receiving; design, installation and testing of piping, tubing and fittings; and installation of vehicle refuelling appliances (VRAs) connected to storage piping. The most recent revision to the Standard includes requirements for indoor fuelling of natural gas vehicles. This Standard, like all Canadian Standards, was subject to periodic review and was most recently reaffirmed in 2004. tabs., figs.

  13. Poultry farming buildings. Natural gas heating. Guidebook of installation rules; Batiments d`elevage avicole. Chauffage au gaz. Guide des regles d`installation

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The technical and economical performances of a poultry farm are greatly influenced by the mastery of ambient temperature during the first days of husbandry. The natural gas space heating installation must answer these requirements and also respect all safety rules concerning the personnel and the animals. In order to answer the questions of poultry farming professionals, the technical association of the natural gas industry (ATG) in France and the Groupama insurance company have redefined the new version of this brochure which integrates the recent technological advances and defines the minimum quality and safety rules required to achieve a natural gas heating installation. The different topics presented are: the gas supply (aerial fixed reservoirs), the general distribution panel (location, command systems, regulation systems for LPG installations, electrical equipments), the distribution pipes (general supply, indoor pipes, flexible pipes, pipe fittings), the heating systems (power, choice, power supply, fastening, air renewal), the check and sign and the start-up of the installation, the periodical control and maintenance operations. (J.S.)

  14. Nuclear installations abroad the accident risks and their potential consequences

    Energy Technology Data Exchange (ETDEWEB)

    Turvey, F J [Radiological Protection Inst. of Ireland (Ireland)

    1996-10-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of `tolerable` risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid.

  15. Nuclear installations abroad the accident risks and their potential consequences

    International Nuclear Information System (INIS)

    Turvey, F.J.

    1996-01-01

    This paper endeavors to assess the threat to Ireland from severe accidents at civil nuclear installations. Among the various types of nuclear installations worldwide, reactors and reprocessing plants are considered to be the most threatening and so the paper focuses on these. The threat is assumed to be a function of the risk of severe accidents at the above types of installations and the probability of unfavourable weather conditions carrying the radioactive releases to Ireland. Although nuclear installations designed in eastern Europe and Asia are less safe than others, the greatest threat to Ireland arises from nearby installations in the UK. The difficulty of measuring the probabilities and consequences of severe nuclear accidents at nuclear installations in general is explained. In the case of the UK installations, this difficulty is overcome to some degree by using values of 'tolerable' risk adopted by the national nuclear regulator to define the radiotoxic releases from nuclear accidents. These are used as input to atmospheric dispersion models in which unfavourable weather conditions for Ireland are assumed and radiation doses are calculated to members of the Irish public. No countermeasures, such as sheltering, are assumed. In the worst cast scenario no deaths would be expected in Ireland in the immediate aftermath of the accident however, an increase in cancers over a period of 25 years or so would be expected assuming present-day models for the effect of low level radiation are valid

  16. Installation of the Gbar LINAC

    CERN Multimedia

    Maximilien, Brice

    2017-01-01

    Installation of the GBAR linac in its shielding bunker. The electrons accelerated to 10 MeV toward a target will produce the positrons that are necessary to form anti hydrogen with the antiprotons coming from the ELENA decelerator.

  17. Environmental assessment [of nuclear installations

    International Nuclear Information System (INIS)

    Townsley, M.

    1989-01-01

    The European Community has introduced a directive which instructs that for all projects likely to have a significant effect on the environment consent should only be given after a rigorous assessment of such effects has been carried out and presented as an environmental statement. Projects requiring environmental assessment include nuclear power stations, any thermal power station over 300MW, any radioactive waste storage or disposal facility, any installation which produces electricity, power lines, installations for fuel production, fuel reprocessing, radioactive waste processing and fuel enrichment. The statement must include a description of the likely effects, direct and indirect, on the environment of the development, with reference to human beings, flora, fauna, soil, water, air, climate, landscape, interactions of two or more of these, material assets and cultural heritage. Measures to avoid or remedy the impact must be included. (U.K.)

  18. Bridging interpersonal installation art with tangible business modeling

    DEFF Research Database (Denmark)

    Mitchell, Robb

    2012-01-01

    This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction.......This position paper introduces an exploration of what deploying physical artefacts to enliven discussions about business innovation has in common with building room sized mechanical installations to provoke social interaction....

  19. Childhood cancer and nuclear installations: a review

    International Nuclear Information System (INIS)

    Muirhead, C.R.

    1998-01-01

    Many epidemiological studies of childhood cancer around nuclear installations have been conducted in recent years. This article reviews results from Great Britain and elsewhere. Geographical studies have indicated raised risks of childhood leukaemia around some British nuclear installations. However, environmental assessments suggest that the findings are unlikely to be due to radioactive releases from the sites. Case-control studies have allowed more detailed investigation of putative risk factors than is possible from geographical studies. In particular, a recent national study in Britain does not support the hypothesis raised by an earlier study in West Cumbria that paternal radiation exposure prior to conception may increase the risk of leukaemia and non-Hodgkin's lymphoma in offspring. Other studies suggest that childhood leukaemia may have an infective basis, although there is still uncertainty about whether this would explain the findings around nuclear installations. The UK Childhood Cancer Study may provide more information on the causes of these diseases. (author)

  20. Update on Geothermal Direct-Use Installations in the United States

    Energy Technology Data Exchange (ETDEWEB)

    Beckers, Koenraad J [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Young, Katherine R [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Snyder, Diana M. [Georgia State University

    2017-02-15

    Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others; power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.

  1. 49 CFR 192.359 - Customer meter installations: Operating pressure.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meter installations: Operating pressure... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.359 Customer meter installations: Operating pressure...

  2. Rapid installation of numerical models in multiple parent codes

    Energy Technology Data Exchange (ETDEWEB)

    Brannon, R.M.; Wong, M.K.

    1996-10-01

    A set of``model interface guidelines``, called MIG, is offered as a means to more rapidly install numerical models (such as stress-strain laws) into any parent code (hydrocode, finite element code, etc.) without having to modify the model subroutines. The model developer (who creates the model package in compliance with the guidelines) specifies the model`s input and storage requirements in a standardized way. For portability, database management (such as saving user inputs and field variables) is handled by the parent code. To date, NUG has proved viable in beta installations of several diverse models in vectorized and parallel codes written in different computer languages. A NUG-compliant model can be installed in different codes without modifying the model`s subroutines. By maintaining one model for many codes, MIG facilitates code-to-code comparisons and reduces duplication of effort potentially reducing the cost of installing and sharing models.

  3. Decommissioning nuclear installations

    International Nuclear Information System (INIS)

    Dadoumont, J.

    2010-01-01

    When a nuclear installation is permanently shut down, it is crucial to completely dismantle and decontaminate it on account of radiological safety. The expertise that SCK-CEN has built up in the decommissioning operation of its own BR3 reactor is now available nationally and internationally. Last year SCK-CEN played an important role in the newly started dismantling and decontamination of the MOX plant (Mixed Oxide) of Belgonucleaire in Dessel, and the decommissioning of the university research reactor Thetis in Ghent.

  4. Order of 27 October 1971 on exemptions from classification as radioactive installations

    International Nuclear Information System (INIS)

    1971-01-01

    This Order was made in implementation of Section 2 of the 1964 Act on nuclear activities which provides that installations where the level of radiation produced entails no significant hazard shall be excluded from the classification of radioactive installations. Consequently, the Order specifies the activity thresholds for radionuclides below which installations containing them are not considered as radioactive installations. (NEA) [fr

  5. Construction for Nuclear Installations. Specific Safety Guide

    International Nuclear Information System (INIS)

    2015-01-01

    This Safety Guide provides recommendations and guidance based on international good practices in the construction of nuclear installations, which will enable construction to proceed with high quality. It can be applied to support the development, implementation and assessment of construction methods and procedures and the identification of good practices for ensuring the quality of the construction to meet the design intent and ensure safety. It will be a useful tool for regulatory bodies, licensees and new entrant countries for nuclear power plants and other nuclear installations

  6. Statement of nuclear incidents at nuclear installations

    International Nuclear Information System (INIS)

    2002-07-01

    A statement of nuclear incidents at nuclear installations in Britain during the first quarter of 2002 is published today by the Health and Safety Executive. It covers the period 1 January to 31 March 2002. There are two installations mentioned in the statement: Dungeness B and Heysham 1. The statement is published under arrangements that came into effect from the first quarter of 1993, derived from the Health and Safety Commission's powers under section 11 of the Health and Safety at Work, etc. Act 1974

  7. 49 CFR 192.357 - Customer meters and regulators: Installation.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Customer meters and regulators: Installation. 192... SAFETY TRANSPORTATION OF NATURAL AND OTHER GAS BY PIPELINE: MINIMUM FEDERAL SAFETY STANDARDS Customer Meters, Service Regulators, and Service Lines § 192.357 Customer meters and regulators: Installation. (a...

  8. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  9. Installation for fatigue testing of materials at cryogenic temperatures

    International Nuclear Information System (INIS)

    Abushenkov, I.D.; Chernetskij, V.K.; Il'ichev, V.Ya.

    1986-01-01

    A new installation for mechanical fatigue tests of structural material samples is described, in which the possibility to conduct tests in the range of lower temperatures (4.2-300 K) is ensured. The installation permits to carry out fatigue tests using the method of axial loading of annular (up to 6 mm in diameter) and plane (up to 12 mm wide) samples during symmetric, asymmetric and pulsing loading cycles. It is shown that the installation suggested has quite extended operation possibilities and, coincidentally, it is characterized by design simplicity, compactness, comparatively low metal consumption and maintenance convenience

  10. Universal smoking installation of rotary type

    Directory of Open Access Journals (Sweden)

    Aminov V. A.

    2017-11-01

    Full Text Available According to the research carried out by the authors the most technological installations for producing meat and fish products are oriented only on one type of raw material (meat or fish, as well as the kind of smoking (cold or hot. Limitations are related to the maximum temperature of the drying agent that affects the product; presence of the system for maintaining the relative humidity of the air mixture; presence of the smoke cooling system coming from the smoke generator and a number of other factors. Enterprises expanding the range of products are forced to purchase new equipment. With a limited production area especially for small businesses this is not convenient. In the paper, a universal smoking installation of the rotor type (USIRT is considered for the production of both meat and fish products using cold or hot smoking. The installation is oriented to a wide range of products. The presence of the smoke cooling system will allow the production of cold smoking products, the presence of the dehumidification and humidification system for the smoke-air mixture will ensure the maintenance of the required technological regime for producing fish and meat products. Based on the example of cold smoking studies have shown that the duration of the process should be reduced while maintaining the quality of the product. For this purpose, ultrasonic (US vibrations have been applied to the smoke-air mixture in USIRT. The studies have been carried out to identify the best type of ultrasound radiators capable of transmitting vibrations of the installation metal surface and from it to pass into the smoke-air mixture in order to intensify the process of cold smoking. The necessary power of ultrasonic generators has been determined. Comparative results of technological processes with the application of ultrasound in the production of fish products have been presented.

  11. Parametric Design and Rapid Prototyping of Installation Box for Vehicle Terminal PCB

    Directory of Open Access Journals (Sweden)

    Wang Xingxing

    2016-01-01

    Full Text Available Installation box for vehicle terminal PCB (Printed Circuit Board was took as research object, which is encountered in the process of project developing. Vehicle terminal PCB in actual development process was set as an example, point cloud data were acquired by three coordinate measuring method; Imageware software was used to reconstruct the vehicle terminal PCB model, basic size parameters of vehicle terminal PCB can be got and then design parameters of installation box for vehicle terminal PCB can be determined. Design of the installation box for vehicle terminal PCB was completed based on Solidworks software, then 3D modeling and 2D drawing of installation box for vehicle terminal PCB was gained. Up Plus 2 rapid prototype machine was used to manufacture installation box for vehicle terminal PCB rapidly based on 3D printing technology, then prototype of installation box for vehicle terminal PCB was obtained. It is of certain engineering significant for single (small amount manufacturing of installation box for general PCB.

  12. Toroid field coil shear key installation study, DOE task No. 22

    International Nuclear Information System (INIS)

    Jones, C.E.; Meier, R.W.; Yuen, J.L.

    1995-01-01

    Concepts for fitting and installation of the scissor keys, triangular keys, and truss keys in the ITER Toroidal Field (TF) Coil Assembly were developed and evaluated. In addition, the process of remote removal and replacement of a failed TF coil was considered. Two concepts were addressed: central solenoid installed last (Naka Option 1) and central solenoid installed first (Naka Option 2). In addition, a third concept was developed which utilized the favorable features of both concepts. A time line for installation was estimated for the Naka Option 1 concept

  13. Will the Current Solution Survive the Future Battlespace? An examination of the Combatant Role of the Australian Army’s Protected mobility capability

    Science.gov (United States)

    2010-12-10

    Interim Infantry Mobility Vehicle IMV Infantry Mobility Vehicle INTERFET International Force East Timor LOE Lines of Effort LWD -1 Land Warfare...produce strategically relevant and combat ready forces.”39 This doctrinal publication, Land Warfare Doctrine 1 ( LWD 1), echoes the difficulties outlined...time. The acknowledgement of this concern is further underlined in LWD 1 which enunciates that “while the strategic situation can change quickly

  14. Installation for analytic chemistry under irradiation

    International Nuclear Information System (INIS)

    Fradin, J.; Azoeuf, P.; Guillon, A.

    1966-01-01

    An installation has been set up for carrying out manipulations and chemical analyses on radioactive products. It is completely remote-controlled and is of linear shape, 15 metres long; it is made up of three zones: - an active zone containing the apparatus, - a rear zone giving access to the active zone, - a forward zone independent of the two others and completely protected from which the remote-control of the apparatus is effected. The whole assembly has been designed so that each apparatus corresponding to an analytical technique is set up in a sealed enclosure. The sealed enclosures are interconnected by a conveyor. After three years operation, a critical review is now made of the installation. (authors) [fr

  15. Seismic Hazards in Site Evaluation for Nuclear Installations. Specific Safety Guide

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-08-15

    This Safety Guide was prepared under the IAEA programme for safety standards for nuclear installations. It supplements the Safety Requirements publication on Site Evaluation for Nuclear Installations. The present publication provides guidance and recommends procedures for the evaluation of seismic hazards for nuclear power plants and other nuclear installations. It supersedes Evaluation of Seismic Hazards for Nuclear Power Plants, IAEA Safety Standards Series No. NS-G-3.3 (2002). In this publication, the following was taken into account: the need for seismic hazard curves and ground motion spectra for the probabilistic safety assessment of external events for new and existing nuclear installations; feedback of information from IAEA reviews of seismic safety studies for nuclear installations performed over the previous decade; collective knowledge gained from recent significant earthquakes; and new approaches in methods of analysis, particularly in the areas of probabilistic seismic hazard analysis and strong motion simulation. In the evaluation of a site for a nuclear installation, engineering solutions will generally be available to mitigate, by means of certain design features, the potential vibratory effects of earthquakes. However, such solutions cannot always be demonstrated to be adequate for mitigating the effects of phenomena of significant permanent ground displacement such as surface faulting, subsidence, ground collapse or fault creep. The objective of this Safety Guide is to provide recommendations and guidance on evaluating seismic hazards at a nuclear installation site and, in particular, on how to determine: (a) the vibratory ground motion hazards, in order to establish the design basis ground motions and other relevant parameters for both new and existing nuclear installations; and (b) the potential for fault displacement and the rate of fault displacement that could affect the feasibility of the site or the safe operation of the installation at

  16. Border installations

    International Nuclear Information System (INIS)

    Lenaerts, K.

    1988-01-01

    This chapter highlights the legal problems raised by the concept of a border installation. Using the Cattenom nuclear power plant as an example, the author describes the different stages of the legal conflict raised by construction of the plant and analyses the relationship between French administrative law and some provisions of the Euratom Treaty. Based on the Treaty, the Community institutions have adopted directives to strengthen inter-State co-operation and consultation between neighbouring countries. He observes that these principles of co-operation, consultation and vigilance already exist in public international law; however, international case law has not yet made it possible to establish the strict liability of the constructing state in case of a nuclear accident (NEA) [fr

  17. 32 CFR 643.121 - Private organizations on DA installations.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true Private organizations on DA installations. 643.121 Section 643.121 National Defense Department of Defense (Continued) DEPARTMENT OF THE ARMY... DA installations. (a) AR 210-1 defines and classifies private organizations, such as thrift shops and...

  18. Completion of installation of DT and RPC chambers before Cosmic Challenge

    CERN Multimedia

    Mimmo Dattola

    2006-01-01

    All the drift tube ("DT") and resistive plate chambers ("RPC") packages foreseen to be installed in the central barrel ring ("YB0") before the magnet test have been installed (some are missing in the photograph but have since been installed). These silver-coloured rectangular boxes in the gaps between the steel of the rings (red in the image) detect muons. Chambers for Sectors 4 and 5 (sector 1 is at the 9 o'clock position and the counting is clockwise) as well as a couple of chambers in the support "feet" (sectors 9 and 11) will be installed after the magnet test. Chambers for sectors 1 and 7 will be installed in the underground cavern ("UXC") - the latter will be in the places used for the lifting and lowering of the ring.

  19. Accuracy of computer-assisted cervicle pedicle screw installation

    International Nuclear Information System (INIS)

    Zhang Honglei; Zhou Dongsheng; Jang Zhensong

    2009-01-01

    Objective: To investigate the accuracy of computer-assisted cervical pedicle screw installation and the reason of screw malposition. Methods: A total of 172 cervical pedicle screws were installed by computer-assisted navigation for 30 patients with lower cervical spinal diseases. All the patients were examined by X-ray and CT after operation. Screw's position and direction were measured on the sagittal and transectional images of intraoperative navigation and post-operative CT. Then linear regression analysis was taken between navigational and post-operative CT's images. Results: Two screws perforated the upper pedicle wall, 3 perforated the lateral pedicle wall.There was a positive linear correlation between navigational and post-operative CT's images. Conclusion: Computer-assisted navigation can provide the high accuracy of cervical pedicle screw installation and excursion phenomenon is reason of screw malposition. (authors)

  20. The Management System for Nuclear Installations. Safety Guide (Spanish Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This Safety Guide is applicable throughout the lifetime of a nuclear installation, including any subsequent period of institutional control, until there is no significant residual radiation hazard. For a nuclear installation, the lifetime includes site evaluation, design, construction, commissioning, operation and decommissioning. These stages in the lifetime of a nuclear installation may overlap. This Safety Guide may be applied to nuclear installations in the following ways: (a) To support the development, implementation, assessment and improvement of the management system of those organizations responsible for research, site evaluation, design, construction, commissioning, operation and decommissioning of a nuclear installation; (b) As an aid in the assessment by the regulatory body of the adequacy of the management system of a nuclear installation; (c) To assist an organization in specifying to a supplier, via contractual documentation, any specific element that should be included within the supplier's management system for the supply of products. This Safety Guide follows the structure of the Safety Requirements publication on The Management System for Facilities and Activities, whereby: (a) Section 2 provides recommendations on implementing the management system, including recommendations relating to safety culture, grading and documentation. (b) Section 3 provides recommendations on the responsibilities of senior management for the development and implementation of an effective management system. (c) Section 4 provides recommendations on resource management, including guidance on human resources, infrastructure and the working environment. (d) Section 5 provides recommendations on how the processes of the installation can be specified and developed, including recommendations on some generic processes of the management system. (e) Section 6 provides recommendations on the measurement, assessment and improvement of the management system of a nuclear

  1. PUREX exhaust ventilation system installation test report

    International Nuclear Information System (INIS)

    Blackaby, W.B.

    1997-01-01

    This Acceptance Test Report validates the testing performed, the exceptions logged and resolved and certifies this portion of the SAMCONS has met all design and test criteria to perform as an operational system. The proper installation of the PUREX exhaust ventilation system components and wiring was systematically evaluated by performance of this procedure. Proper operation of PUREX exhaust fan inlet, outlet, and vortex damper actuators and limit switches were verified, using special test equipment, to be correct and installed wiring connections were verified by operation of this equipment

  2. High voltage electricity installations a planning perspective

    CERN Document Server

    Jay, Stephen Andrew

    2006-01-01

    The presence of high voltage power lines has provoked widespread concern for many years. High Voltage Electricity Installations presents an in-depth study of policy surrounding the planning of high voltage installations, discussing the manner in which they are percieved by the public, and the associated environmental issues. An analysis of these concerns, along with the geographical, environmental and political influences that shape their expression, is presented. Investigates local planning policy in an area of the energy sector that is of highly topical environmental and public concern Cover

  3. Tolley's industrial and commercial gas installation practice

    CERN Document Server

    Hazlehurst, John

    2010-01-01

    This is the third of three essential reference volumes for those concerned with the installation and servicing of domestic and industrial gas equipment. This volume explains the basic principles underlying the practical and theoretical aspects of installing and servicing gas appliances and associated equipment, from the basics of combustion, to burners, pressure and flow, transfer of heat, controls, as well as materials and processes, electrical aspects, and metering and measuring devices. Covering both Natural Gas and Liquefied Petroleum Gas, the many illustrations and worked examples include

  4. Seal of quality for planners of geothermal energy installations, prize for geothermal installations; Guetesiegel fuer Planer von Geothermieanlagen, Geothermiepreis Phase I (2002)

    Energy Technology Data Exchange (ETDEWEB)

    Eugster, W. J. [Polydynamics Engineering Zuerich, Zuerich (Switzerland); Eberhard, M. [Eberhard and Partner AG, Aarau (Switzerland); Koschenz, M. [EMPA, Duebendorf (Switzerland); Morath, M. [Lippuner and Partner AG, Grabs (Switzerland); Rohner, E. [Engeo AG, Arnegg (Switzerland)

    2003-07-01

    This final report for the Swiss Federal Office for Energy describes a project that aimed to improve the awareness of planners and installers involved in geothermal energy projects for the problems encountered when dimensioning both large and small geothermal installations, and to provide the basic knowledge necessary for a correct sizing of such plants. The report's main emphasis is placed on three types of geothermal plant, bore-hole heat exchangers, groundwater use and energy pile installations. The concept of the training programme involved is described, which is to issue certificates and labels for the attainment of three levels of ability. These three levels (Labels A, B and C) cover simple, small plants for heating operation, medium sized plants within a heating capacity range of 30 to approximately 100 kW and large plants for heating and cooling operation with heat capacities greater than 100 kW, respectively. The report also includes details of the time-line aimed for and costs. Also, the idea of an annual prize for geothermal installations is briefly discussed.

  5. 40 CFR 1042.130 - Installation instructions for vessel manufacturers.

    Science.gov (United States)

    2010-07-01

    ...) AIR POLLUTION CONTROLS CONTROL OF EMISSIONS FROM NEW AND IN-USE MARINE COMPRESSION-IGNITION ENGINES...-speed operation, tell vessel manufacturers not to install the engines in variable-speed applications or... vessel manufacturers. (a) If you sell an engine for someone else to install in a vessel, give the engine...

  6. 7 CFR 58.214 - General construction, repair and installation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false General construction, repair and installation. 58.214... Service 1 Equipment and Utensils § 58.214 General construction, repair and installation. All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device...

  7. 14 CFR 171.9 - Installation requirements.

    Science.gov (United States)

    2010-01-01

    ...) The facility must be installed according to accepted good engineering practices, applicable electric... a power distribution system or locally generated, with a supplemental standby system, if needed. (c...

  8. Decommissioning of nuclear installations - regulations - financing - responsibility - insurance

    International Nuclear Information System (INIS)

    Hubert, E.H.; Andersson, C.; Deprimoz, J.; Mayoux, J.C.; Richard, M.; Sartorelli, C.; Nocera, F.

    1983-01-01

    This paper highlights three aspects of decommissioning of nuclear installations which relate, more or less directly, to legal options already applied or advocated. It reviews the regulatory conditions for decommissioning a nuclear installation and indicates legal provisions for financing decommissioning expenditures. It also describes the legal provisions to determine liabilities in case of nuclear damage and the assistance which insurers may provide to cover the consequences of such liabilities. (NEA) [fr

  9. Designing Software-Based Interactive Installations

    DEFF Research Database (Denmark)

    Andreasen, Troels; Juul, Niels Christian; Rosendahl, Mads

    2014-01-01

    of the installation using tools like sketching or storyboarding. The design involves a clarification of available and appropriate building blocks, as well as the linking of these blocks to provide an architectural framework comprising the intended external behavior. The construction phase takes a component...

  10. Development of a quality management system for Brazilian nuclear installations

    International Nuclear Information System (INIS)

    Kibrit, Eduardo; Zouain, Desiree Moraes

    2005-01-01

    The present work is a proposal for developing a quality management system for Brazilian nuclear installations, based on applicable standards. The standard ISO 9001:2000 [4] establishes general requirements for the implementation of a quality management system in all kinds of organizations. The standard IAEA 50-C/SG-Q [1] establishes general requirements for the implementation of a quality assurance system in nuclear installations. The standard CNEN-NN- 1.16 [5] establishes the regulating requirements for the quality assurance systems and programs of nuclear installations, for licensing and authorization for operation of these installations in Brazil. The revision of standard IAEA 50-C/SG-Q [1], to be replaced by IAEA DS 338 [2] and IAEA DPP 349 [3], introduces the concept of 'Integrated Management System' for the nuclear area, in preference to the concept of 'Quality Assurance'. This approach is incorporated with the current tendency, because it guides the system to manage, in an integrated way, the requirements of quality, safety, health, environment, security and economics of the installation. The results of the characterization of the quality management systems established in the applicable standards are presented, with the determination of the common and conflicting points among them. Referring data to quality assurance program/quality management system in some nuclear installations of IAEA Member States are also presented. (author)

  11. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey; Le plutonium: mise en suspension d'aerosols dans les installations nucleaires: synthese bibliographique

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph; Monfort, M; Armand, P [CEA Bruyeres-le-Chatel, Dept. Analyse Surveillance Environnement, Service Radioanalyse Chimie Environnement, 91 (France); Alloul-Marmor, L [Societe APTUS, 78 - Versailles (France)

    2006-07-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  12. Nuclear installations safety in France. Compilation of regulatory guides

    International Nuclear Information System (INIS)

    1988-01-01

    General plan: 1. General organization of public officials. Procedures 1.1. Texts defining the general organization and the procedures 1.2. Interventing organisms; 2. Texts presenting a technical aspect other than basic safety rules and associated organization texts; 2.1. Dispositions relating to safety of nuclear installations 2.2. Dispositions relating to pressure vessels 2.3. Dispositions relating to quality 2.4. Dispositions relating to radioactive wastes release 2.5. Dispositions relating to activities depending of classified installations; 3. Basic Safety Rules (BSR) 3.1. BSR relating to PWR 3.2. BSR relating to nuclear installations other than PWR 3.3. Other BSR [fr

  13. 30 CFR 77.1605 - Loading and haulage equipment; installations.

    Science.gov (United States)

    2010-07-01

    ... UNDERGROUND COAL MINES Loading and Haulage § 77.1605 Loading and haulage equipment; installations. (a) Cab... railroads shall be designed, installed, and maintained in a safe manner consistent with the speed and type... projection of moving railroad equipment shall be provided on at least one side of the tracks; all places...

  14. Authorization for the functioning of installations for food irradiation

    International Nuclear Information System (INIS)

    1980-09-01

    The conditions for the functioning of nuclear installations destinated to food irradiation are established according to the decree n 0 72718 of August, 29, 1973. These conditions are applied to any nuclear installations that uses food irradiation aiming to research or production of food in industrial scale. (E.G.) [pt

  15. Annual report 1 January - 31 December 1978 computer installation

    International Nuclear Information System (INIS)

    1979-05-01

    The computer installation of Risoe National Laboratory functions as an internal service bureau. The staff is concentrated around operating the computer and providing expertise in the fields of numerical mathematics, statistics, operation research, systems software, and software engineering. Selected parts of the activities at the Computer Installation are described. (B.P.)

  16. 26 CFR 1.381(c)(8)-1 - Installment method.

    Science.gov (United States)

    2010-04-01

    ... 26 Internal Revenue 4 2010-04-01 2010-04-01 false Installment method. 1.381(c)(8)-1 Section 1.381(c)(8)-1 Internal Revenue INTERNAL REVENUE SERVICE, DEPARTMENT OF THE TREASURY (CONTINUED) INCOME TAX (CONTINUED) INCOME TAXES Insolvency Reorganizations § 1.381(c)(8)-1 Installment method. (a) Carryover...

  17. Installation Strategic Planning Guidebook

    Science.gov (United States)

    2012-05-01

    Installation natural resource concerns (for example, wetlands , number of endangered species, water use restrictions, encroachment on training lands...Koehler Publishing, 1994 7. Strategy Safari – A Guided Tour Through the Wilds of Strategic Management by Henry Mintzberg, Bruce Ahlstrand, and...T. (1987). NY: Knopf 36. Shaping Strategic Planning: Frogs, Dragons, Bees and Turkey Tails. Pfeiffer, J. W., Goodstein, L. D. & Nolan, T. M. (1989

  18. Design of the Los Alamos generator installation

    International Nuclear Information System (INIS)

    Boenig, H.J.; Schillig, J.B.; Rogers, J.D.; Huddleston, S.W.; Konkel, H.E.; Rosev, B.J.

    1989-01-01

    A 1430 MVA synchronous generator from a cancelled nuclear power plant is being installed at Los Alamos to be used as the pulsed power generator for the Confinement Physics Research Facility. The generator is mounted on a spring foundation to avoid dynamic forces from being transmitted to the substructure and the ground. A 6 MW load-commutated inverter drive will accelerate the machine from standstill to the maximum operating speed of 1800 rpm and from 1260 rpm to 1800 rpm between load pulses. The generator cooling method is being changed from hydrogen to air cooling. A current limiting fuse, with a fuse clearing current of 80 kA, will protect the generator output against short circuit currents. Changes in the excitation system are described. A status report of the installation and an approximate schedule for completing the installation are presented. The paper also addresses results of special studies and tests undertaken to evaluate the condition of the generator and to predict the behavior of some critical mechanical generator components under pulsed loading conditions. 1 ref., 4 figs., 2 tabs

  19. Renewable Energy Assessment Methodology for Japanese OCONUS Army Installations

    Energy Technology Data Exchange (ETDEWEB)

    Solana, Amy E.; Horner, Jacob A.; Russo, Bryan J.; Gorrissen, Willy J.; Kora, Angela R.; Weimar, Mark R.; Hand, James R.; Orrell, Alice C.; Williamson, Jennifer L.

    2010-08-30

    Since 2005, Pacific Northwest National Laboratory (PNNL) has been asked by Installation Management Command (IMCOM) to conduct strategic assessments at selected US Army installations of the potential use of renewable energy resources, including solar, wind, geothermal, biomass, waste, and ground source heat pumps (GSHPs). IMCOM has the same economic, security, and legal drivers to develop alternative, renewable energy resources overseas as it has for installations located in the US. The approach for continental US (CONUS) studies has been to use known, US-based renewable resource characterizations and information sources coupled with local, site-specific sources and interviews. However, the extent to which this sort of data might be available for outside the continental US (OCONUS) sites was unknown. An assessment at Camp Zama, Japan was completed as a trial to test the applicability of the CONUS methodology at OCONUS installations. It was found that, with some help from Camp Zama personnel in translating and locating a few Japanese sources, there was relatively little difficulty in finding sources that should provide a solid basis for conducting an assessment of comparable depth to those conducted for US installations. Project implementation will likely be more of a challenge, but the feasibility analysis will be able to use the same basic steps, with some adjusted inputs, as PNNL’s established renewable resource assessment methodology.

  20. Wireless installation standard

    International Nuclear Information System (INIS)

    Lim, Hwang Bin

    2007-12-01

    This is divided six parts which are radio regulation law on securing of radio resource, use of radio resource, protection of radio resource, radio regulation enforcement ordinance with securing, distribution and assignment of radio regulation, radio regulation enforcement regulation on utility of radio resource and technical qualification examination, a wireless installation regulation of technique standard and safety facility standard, radio regulation such as certification regulation of information communicative machines and regulation of radio station on compliance of signal security, radio equipment in radio station, standard frequency station and emergency communication.

  1. Installation package - home solar heater

    Science.gov (United States)

    1980-01-01

    Installation of commerical solar-heating system at two story, three bedroom house in New Hampshire is described in 65 page report. System collectors are integrated part of building replacing conventional roofing or siding. Report also includes general description of system, its operation and guidelines, orientation and references.

  2. Safety report concerning the reactor Pegase - volume 1 - Description of the installation - volume 2 - Safety of the installations

    International Nuclear Information System (INIS)

    Lacour, J.

    1964-01-01

    In the first volume: This report is a description of the reactor Pegase, given with a view to examine the safety of the installations. The Cadarache site at which they are situated is briefly described, in particular because of the consequences on the techniques employed for building Pegase. A description is also given of the original aspects of the reactor. The independent loops which are designed for full-scale testing of fuel elements used in natural uranium-gas-graphite reactor systems are described in this report, together with their operational and control equipment. In the second volume: In the present report are examined the accidents which could cause damage to the Pegase reactor installation. Among possible causes of accidents considered are the seismicity of the region, an excessive power excursion of the reactor and a fracture in the sealing of an independent loop. Although all possible precautions have been taken to offset the effects of such accidents, their ultimate consequences are considered here. The importance is stressed of the security action and regulations which, added to the precautions taken for the construction, ensure the safety of the installations. (authors) [fr

  3. Philosophy and safety requirements for land-based nuclear installations

    International Nuclear Information System (INIS)

    Kellermann, Otto

    1978-01-01

    The main ideas of safety philosophy for land-based nuclear installations are presented together with their background of protection goals. Today's requirements for design and quality assurance are deductively shown. Finally a proposition is made for a new balancing of safety philosophy according to the high safety level that nuclear installations have reached

  4. ATLAS Software Installation on Supercomputers

    CERN Document Server

    Undrus, Alexander; The ATLAS collaboration

    2018-01-01

    PowerPC and high performance computers (HPC) are important resources for computing in the ATLAS experiment. The future LHC data processing will require more resources than Grid computing, currently using approximately 100,000 cores at well over 100 sites, can provide. Supercomputers are extremely powerful as they use resources of hundreds of thousands CPUs joined together. However their architectures have different instruction sets. ATLAS binary software distributions for x86 chipsets do not fit these architectures, as emulation of these chipsets results in huge performance loss. This presentation describes the methodology of ATLAS software installation from source code on supercomputers. The installation procedure includes downloading the ATLAS code base as well as the source of about 50 external packages, such as ROOT and Geant4, followed by compilation, and rigorous unit and integration testing. The presentation reports the application of this procedure at Titan HPC and Summit PowerPC at Oak Ridge Computin...

  5. Improvement of an installation to generate shock waves

    Energy Technology Data Exchange (ETDEWEB)

    1974-04-29

    An installation to generate a shock wave in a fluid layer is described. A water projectile is moved at a high velocity. It leaves behind an underpressure in which the adjacent water implodes, therby generating the desired shock wave. The installation is characterized by a tube-shaped hull in which a piston can move freely. One side of the hull is connected to the pressure-generator chamber of the piston. (6 claims)

  6. Facebook Applications' Installation and Removal: A Temporal Analysis

    OpenAIRE

    Kagan, Dima; Fire, Michael; Elyashar, Aviad; Elovici, Yuval

    2013-01-01

    Facebook applications are one of the reasons for Facebook attractiveness. Unfortunately, numerous users are not aware of the fact that many malicious Facebook applications exist. To educate users, to raise users' awareness and to improve Facebook users' security and privacy, we developed a Firefox add-on that alerts users to the number of installed applications on their Facebook profiles. In this study, we present the temporal analysis of the Facebook applications' installation and removal da...

  7. Radiation protection systems on the TESLA Accelerator Installation

    International Nuclear Information System (INIS)

    Pavlovic, R.

    1996-01-01

    In the Institute of Nuclear sciences VINCA, the Accelerator Installation TESLA which is an medium energy ion accelerator facility consisting of an isochronous cyclotron VINCY, a heavy ion source, a D/H ion source, three low energy and five high energy experimental channels is now under construction. Some problems in defining radiation protection and safety programme, particularly problems in construction appropriate shielding barriers at the Accelerator Installation TESLA are discussed in this paper. (author

  8. Chapter 4. Assessment and inspection of nuclear installations

    International Nuclear Information System (INIS)

    2001-01-01

    Supervisory activity of Nuclear Regulatory Authority of the Slovak Republic (UJD) upon the safety of nuclear installations in compliance with the 'Atomic Act' and other legal regulations includes also inspection and assessment activities of UJD. Assessment activity of UJD in relation to nuclear installations lies in assessment of safety documentation for constructions realised as nuclear installations, or constructions through which changes are realised on nuclear installations. The scope of safety documentation required for the assessment is stipulated in the Atomic Act. In 2000 the assessment activity focused first of all on Unit 1 of NPP Bohunice after completing its Gradual Reconstruction Programme, on National Repository of Radioactive waste in Mochovce and on radioactive waste conditioning and treatment technology in Jaslovske Bohunice. Activities of UJD in assessment focused mainly on control of compliance with requirements for nuclear safety, assessment of commissioning programmes, operating procedures, limits and conditions, etc. The assessment of changes, which influence nuclear safety of nuclear installations in operation, realisation of which is conditioned by the approval from UJD, is a significant part of the assessment activity of UJD. Mainly it is the assessment of design changes, changes in limits and conditions, operating procedures, changes in programmes of periodical testing of equipment important in terms of nuclear safety, changes in physical protection of nuclear equipment, etc. The assessment of nuclear installations operational safety, based on assessment of operational events, on maintaining limits and conditions of safe operation, on operational safety performance indicators and on inspection results is a separate category in the assessment activity of UJD. Inspection activity specified in the 'Atomic Act' is governed by an internal guideline, an important part of which is an annual inspection plan that considers the following types of

  9. Swarming and the Future of Warfare

    Science.gov (United States)

    2005-01-01

    and Plans DIVARTY Division Artillery DoD Department of Defense EO Electro-Optical EXFOR Experimental Force FLIR Forward-Looking Infrared FOFA Follow-on...HUMINT Human Intelligence xiii IED Improvised Explosive Device IFV Infantry Fighting Vehicle 10 Information Operations IR Infrared ISR Intelligence...and the rifles of WW2 (9 out of 1,000). 37 No longer could artillery unlimber within 300 yards and shoot at infantry with relative impunity since

  10. The City’s Many Faces: Proceedings of the RAND Arroyo-MCWL-J8 UWG Urban Operations Conference, April 13-14 1999

    Science.gov (United States)

    1999-04-14

    FBI Headquarters FCU Future Combat Vehicle FDA Food and Drug Administration FEMA Federal Emergency Management Agency FLIR Forward Looking Infrared ...Infantry IN (L) Infantry (Light) 10 Information Operations IPB Intelligence Preparation of the Battlefield IPSF Interim Public Security Forces IR Infrared ...Acquisition Program WSO Weapons System Officer vi The City’s Many Faces WTI Weapons and Tactics Instructor WW2 World War Two Y2K Year 2000, often used

  11. Monitoring and evaluation of Blyth Offshore Wind Farm. Installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L.

    2001-07-01

    The principle aim of this report is to appraise the practical aspects of installation and commissioning of the offshore wind farm. The construction and installation activities of the project were monitored and reviewed by the project team to enable recommendations for future larger projects to be made. This report particularly looks at how the project progressed against the construction and installation schedule with regard to weather conditions and operational procedures. The document not only describes the methods of installation, assembly and cable laying, but also reviews the effectiveness of those methods including any difficulties that were encountered and the solutions that were found. (author)

  12. Dismounted Infantry Visualization Research: The Dismounted Infantry Simulation (DISim)

    National Research Council Canada - National Science Library

    Thomas, Mark

    2002-01-01

    .... Targeted to the simulation needs of the ground warfighter, the algorithms developed using the DISim test-bed are high-resolution real-time effects for simulation, training, and mission rehearsal. C++...

  13. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  14. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey

    International Nuclear Information System (INIS)

    Guetat, Ph.; Monfort, M.; Armand, P.; Alloul-Marmor, L.

    2006-01-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  15. 30 CFR 75.310 - Installation of main mine fans.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of main mine fans. 75.310 Section... mine fans. (a) Each main mine fan shall be— (1) Installed on the surface in an incombustible housing... that gives a signal at the mine when the fan either slows or stops. A responsible person designated by...

  16. Practical methods for radiation survey in nuclear installations

    International Nuclear Information System (INIS)

    Shweikani, R.

    2001-12-01

    This study is placed to those who are responsible to perform radiation survey in the nuclear installations, especially the beginners. Therefore, it gives a comprehensive view to all-important aspects related to their work starting from the structure of atoms to the practical steps for radiation survey works. So, it clarify how to perform personal monitoring, methods for monitoring surface contamination, methods for measuring radioactivity of gases and radioactive aerosols in air, monitoring radiation doses, measuring radiation influences in workplaces and finally measuring internal exposure of radiation workers in nuclear installations. Finally, The study shows some cases of breaches of radiation protection rules in some American nuclear installations and describes the final results of these breaches. The aim of this is to assure that any breach or ignore to radiation protection principles may produce bad results, and there is no leniency in implementing environmental radiation protection principles. (author)

  17. 16 CFR 460.15 - How installers must handle fact sheets.

    Science.gov (United States)

    2010-01-01

    ... ADVERTISING OF HOME INSULATION § 460.15 How installers must handle fact sheets. If you are an installer, you... from you, you must show them the fact sheet(s) for the type(s) of insulation they want. You can decide...

  18. LHC: installation du plus grand trajectographe au silicium du monde

    CERN Multimedia

    2008-01-01

    The installation of the largest silicon trajectograph of the world was concluded at CERN. Thursday December 13 at dawn, the silicon trajectograph with ribbons of CMS (*) began its trip from the principal site of CERN to its installation of experimentation.

  19. Approach and organisation of radiation sources safety and security of installations

    International Nuclear Information System (INIS)

    Al-Hilali, S.

    1998-01-01

    Development of application of techniques using radiation sources was fact in all public domains. Although all these techniques were meant for so called peaceful uses they should respect safety regulations in order to ensure safety of personnel, public and the environment. Security system for installations adopted by CNESTEN is based on establishing administrative and technical protection of the installation against external or internal aggression on one hand and protection of the environment by confining radioactivity, on the other hand. Application of Methode Organisee et Systematique d'analyse de risque (MOSAR) at the installations of CNESTEN showed weak points in order to define barriers for prevention and means necessary for management and dealing with accidental situations. At the first stage this attitude was limited to qualitative considerations adopting macroscopic analysis of each installation. Experience obtained from operation of these installation, which have started operation hardly a few months ago, would establish a real database indispensable for complete risk analysis including quantification of possible risks

  20. Completed installations and the individual commissioning of the KSTAR MG system

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Chang-Hwan, E-mail: kch2004@nfri.re.kr [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Eom, Dae-young; Lee, Woo-Jin; Kong, Jong-Dea; Joung, Nam-Young; Kim, Yang-Soo; Kwon, Myeun [National Fusion Research Institute, 169-148 Gwahangno, Yusung-gu, Daejeon 305-333 (Korea, Republic of); Jang, Eun; Han, Chul-Woo; Lee, Sel-Ki; Kim, Gwang-Seon; Maeng, Jae-Hoon [Vitzrotech Co., Ltd, 605-2 Seonggok-dong, Danwon-gu, Ansan, Gyeonggi-do 425-833 (Korea, Republic of)

    2014-04-15

    Highlights: • All components of the MG system were made from each professional supplier and installed completely in the NFRI site. • The building and the overhead crane which need to install the MG system, were built in two sections. One is for the bearing, rotor and stator and the other section is for the VVVF and excitation system. • The dummy coil testing will commence in July 2013 and the comprehensive performance test of MG will be tested from August when the MPS commissioning is processing with superconducting coil. - Abstract: Peak power of 200 MVA is required in order to achieve the goal within a long pulse scenario for the final operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The available grid power is only 100 MVA at the National Fusion Research Institute (NFRI) site. Motor generator (MG) was considered as a method of resolving such problems. The design of the KSTAR MG system was completed in July 2010 and individual devices were produced by relevant manufacturers. The installation of individual devices was completed in December 2012. Specifically, the stator and rotor were assembled at the site due to their large size and weight. The bearings, variable voltage variable frequency (VVVF) and excitation systems were transported and installed on site after being manufactured externally. The building used for MG installation was built in 2011. With the building designed for ease of installation, an overhead crane was designed to allow access to the loading bay. In this paper, we discuss the installation of the MG system and the construction of the building suitable for installation of individual devices. In addition, performance on the test results of individual devices is also discussed.

  1. Classified installations for environmental protection: Tome 3. Departmental orders, memorandum, technical instructions

    International Nuclear Information System (INIS)

    Anon.

    1993-06-01

    Legislation about classified installations or plants govern most of industries or dangerous or pollutant activities. This legislation aims to prevent risks and harmful effects coming from an installation or equipments : air pollution, water pollution, noise, wastes produced by installation, even aesthetic bad effects are taken in account. Pollutant or dangerous activities are defined in a list called nomenclature which obliged installations to a rule of declaration or authorization. Technical regulations ordered by the prefect (administrator of a french department) are listed in tome 3

  2. Funding Site Cleanup at Closing Army Installations: A Stochastic Optimization Approach

    National Research Council Canada - National Science Library

    Ardic, Sureyya

    2001-01-01

    ...) to help determine how to allocate limited yearly funding to installations for environmental cleanup, Considering environmental policies and yearly installation funding requests from 2002 to 2015...

  3. Plutonium: resuspension of aerosols in nuclear installations: bibliographic survey; Le plutonium: mise en suspension d'aerosols dans les installations nucleaires: synthese bibliographique

    Energy Technology Data Exchange (ETDEWEB)

    Guetat, Ph.; Monfort, M.; Armand, P. [CEA Bruyeres-le-Chatel, Dept. Analyse Surveillance Environnement, Service Radioanalyse Chimie Environnement, 91 (France); Alloul-Marmor, L. [Societe APTUS, 78 - Versailles (France)

    2006-07-01

    This document presents an analysis and a bibliographical synthesis of the studies on resuspension factors for plutonium. It aims at helping the engineers of safety to specify the scenarios of accidents which relate to their activities and to bring elements justified for the definition of their term-source 'installation' in the safety reports of the installations. (authors)

  4. Heating equipment installation system

    International Nuclear Information System (INIS)

    Meuschke, R.E.; Pomaibo, P.P.

    1991-01-01

    Disclosed is a method for installing a heater unit assembly in a reactor pressure vessel for performance of an annealing treatment on the vessel, the vessel having a vertical axis, being open at the top, being provided at the top with a flange having a horizontal surface, and being provided internally, at a location below the flange, with orientation elements which are asymmetrical with respect to the vertical axis, by the steps of: providing an orientation fixture having an upwardly extending guide member and orientation elements and installing the orientation fixture in the vessel so that the orientation elements of the orientation fixture mate with the orientation elements of the pressure vessel in order to establish a defined position of the orientation fixture in the pressure vessel, and so that the guide member projects above the pressure vessel flange; placing a seal ring in a defined position on the pressure vessel flange with the aid of the guide member; mounting at least one vertical, upwardly extending guide stud upon the seal ring; withdrawing the orientation fixture from the pressure vessel; and moving the heater unit assembly vertically downwardly into the pressure vessel while guiding the heater unit assembly along a path with the aid of the guide stud. 5 figures

  5. TFTR Inner Support Structure final assembly and installation

    International Nuclear Information System (INIS)

    Rocco, R.E.; Brown, G.; Carglia, G.; Heitzenroeder, P.; Koenig, F.; Mookerjee, S.; Raugh, J.

    1983-01-01

    The Inner Support Structure (ISS) of the TFTR provides a specific level of restraint to the net centering force and overturning moment produced by the Toroidal Field (TF) coils and to the vertical forces produced by the Inner Poloidal Field (PF) coils. This is accomplished consistent with the need for four radial dielectric breaks running the entire length of the ISS to prevent eddy current loops. A brief description of the major components, method of manufacture and material selection of the ISS and PF coils is presented. Particular attention is given to the integration of the PF coils and the ISS components into the total assembly and the installation of strain gauges and crack monitors on the ISS. The requirements of no gaps at the interfaces of the ISS teeth at all three horizontal planes is discussed. The problem encountered with achieving the no gap requirement and the successful resolution of this problem, including its impact on installation of the ISS, is also discussed. The installation of the ISS, including setting in position, preloading with TF coil clips, and final tensioning of the tension bars is discussed. A brief description of the lower and upper lead stem splicing operation is presented. Subsequent to the final assembly, electrical tests were performed prior to and after installation on the TFTR machine. An overview of the tests and their results is presented

  6. Installation of wireless LAN system into the SuperKEKB accelerator tunnel

    International Nuclear Information System (INIS)

    Iwasaki, Masako; Satoh, Masanori

    2014-01-01

    We have installed a wireless LAN system of the accelerator control network into the accelerator tunnel for SuperKEKB, which is the upgrade plan of the KEKB B-factory project. The wireless LAN system is used for the construction and maintenance of the accelerator components. The leaky coaxial cable (LCX) antennas are installed into the arc sections of SuperKEKB tunnel, and the collinear antennas are installed into the straight sections and the injector Linac. We have selected the LCX and collinear antennas with good radiation hardness of more than 1 MGy. After the installation, we evaluated the wireless LAN system and obtained the good network speed performance in the whole tunnel area. (author)

  7. Inventory of chemical releases of nuclear installations in the North-Cotentin; Inventaire des rejets chimiques des installations nucleaires du Nord-Cotentin

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-05-15

    The nuclear installations concerned by this study are Cogema La Hague, the Flamanville nuclear power plant, the Manche plant and the National Navy of Cherbourg.The objective followed by the ' source term ' work group has consisted in counting and examining the whole of existing measures relative to the releases of chemical substances in the liquid and gaseous effluents. Then because of the lack of measures for the operation first years of installations, the work group has estimated the order of magnitude of these chemical releases (essentially for Cogema La Hague). This report presents a review of the literature looking at the background levels of chemicals in different environmental compartments: air, soil, plants and animals products. these values have been summarized here to be available for comparisons with concentrations input by the North Cotentin nuclear installations, calculated by the G.R.N.C. (radioecology group of Nord Cotentin)

  8. 46 CFR 169.680 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of 50 Volts Or More on Vessels of Less Than 100 Gross Tons § 169.680 Installation of wiring for power...

  9. 46 CFR 169.673 - Installation of wiring for power and lighting circuits.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Installation of wiring for power and lighting circuits... SCHOOLS SAILING SCHOOL VESSELS Machinery and Electrical Electrical Installations Operating at Potentials of Less Than 50 Volts on Vessels of Less Than 100 Gross Tons § 169.673 Installation of wiring for...

  10. Treasure Transformers: Novel Interpretative Installations for the National Palace Museum

    Science.gov (United States)

    Hsieh, Chun-Ko; Liu, I.-Ling; Lin, Quo-Ping; Chan, Li-Wen; Hsiao, Chuan-Heng; Hung, Yi-Ping

    Museums have missions to increase accessibility and share cultural assets to the public. The National Palace Museum intends to be a pioneer of utilizing novel interpretative installations to reach more diverse and potential audiences, and Human-Computer Interaction (HCI) technology has been selected as the new interpretative approach. The pilot project in partnership with the National Taiwan University has successfully completed four interactive installations. To consider the different nature of collections, the four systems designed against different interpretation strategies are uPoster, i-m-Top, Magic Crystal Ball and Virtual Panel. To assess the feasibility of the project, the interactive installations were exhibited at the Taipei World Trade Center in 2008. The purpose of this paper is to present the development of the "Treasure Transformers" exhibition, design principles, and effectiveness of installations from the evaluation. It is our ambition that the contributions will propose innovative media approaches in museum settings.

  11. Nuclear reactor installation

    International Nuclear Information System (INIS)

    Keller, W.

    1976-01-01

    A nuclear reactor installation includes a pressurized-water coolant reactor vessel and a concrete biological shield surrounding this vessel. The shield forms a space between it and the vessel large enough to permit rapid escape of the pressurized-water coolant therefrom in the event the vessel ruptures. Struts extend radially between the vessel and shield for a distance permitting normal radial thermal movement of the vessel, while containing the vessel in the event it ruptures, the struts being interspaced from each other to permit rapid escape of the pressurized-water coolant from the space between the shield and the vessel

  12. Règle d'installation vidéosurveillance

    CERN Document Server

    2011-01-01

    Ce référentiel définit les exigences techniques minimales applicables aux systèmes de vidéosurveillance, avec des caméras implantées à l’intérieur ou l’extérieur. Il donne des recommandations pour concevoir, installer et maintenir des systèmes de vidéosurveillance dans des applications de sécurité. Pour une vidéosurveillance efficace, on pourra appliquer la méthodologie proposée : comment réaliser l’analyse de risque ? Quel rôle attribuer au système de vidéosurveillance ? quel système mettre en place, avec quelles fonctions et quelles caractéristiques techniques ? comment réaliser l’installation ? comment assurer la maintenance du système ? Cette nouvelle édition a notamment pour objectifs de : compléter les rôles de la vidéosurveillance (gestion d'activité) ; clarifier la définition des objectifs de prise de vue ; inclure l'utilisation d'une cible normalisée pour la réception de l'installation ; mettre à disposition un outil d'aide pour les petits systèmes ;...

  13. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    OpenAIRE

    Petru Chioncel; Cristian Paul Chioncel; Nicoleta Gillich

    2013-01-01

    This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  14. Installing the ALICE detector

    CERN Multimedia

    Maximilien Brice

    2006-01-01

    The huge iron yoke in the cavern at Point 2 in the LHC tunnel is prepared for the installation of the ALICE experiment. The yoke is being reused from the previous L3 experiment that was located at the same point during the LEP project from 1989 to 2000. ALICE will be inserted piece by piece into the cradle where it will be used to study collisions between two beams of lead ions.

  15. Measurements of image characteristics of DSA installations

    International Nuclear Information System (INIS)

    Busch, H.P.; Strauss, L.G.; Freimarck, R.D.

    1984-01-01

    Measurements for quantifying the image characteristics were carried out on three DSA installations (DVI 1 - Philips, Angiotron - Siemens and DF 3000 - General Eletric). Contrast resolution was measured with a vessel phantom (General Electric) and spatial resolution with a lead grid. A further parameter was the dose entering the image intensifier. The Angiotron was used with an intensifier with 53 cm. diameter and the DF 3000 with temporal subtraction of the video images and the subtraction of dual energy images (hybrid technique). These measurements can be carried out quickly and easily and are a step towards standardisation of measurements of image characteristics of DSA installations. (orig.) [de

  16. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  17. Electro magnetic compatibility of cabling and wiring in buildings and installations

    OpenAIRE

    Steenstra, H.T.

    2008-01-01

    The thesis deals with the behaviour, with respect to EMC (Electro Magnetic Compatibility), of cabling and wiring in buildings and installations. Measurement and calculation methods are developed and applied to cabling in a large scale installation as well as to individual cables. Besides, the location and interconnection of conductors, especially concrete reinforcement, in a building is investigated. Finally a procedure is developed that is used to deal with EMC issues in a large installation...

  18. Abstracts of ARI Research Publications FY 1980

    Science.gov (United States)

    1983-05-01

    personnel, Lasswell projected that .- • "specialists in violence ," i.e., military elites, would add management to their repertoire of skills and would become...techniques: Rules of play for two-player/ multiplayer infantry mapboard gaxu&s. January 1979. (AD A077 476) The objective of this project was to...two-player or multiplayer use, (b) an infantry squad/platoon level field opposition exercise, and (c) a combined arms platoon/company level mapboard

  19. There Shall We Be Also: Tribal Fractures and Auxiliaries in the Indian Wars of the Northern Great Plains

    Science.gov (United States)

    2008-11-20

    Director ~ Thomas A. BrUS ~h.D. Monograph Reader MiCh~~--- Director, School of Advanced Military Studies ~~~M ___ ’" Director, Robert F. Bau , Ph.D...Indians, Infants, and Infantry: Andrew and Elizabeth Burt on the Frontier (Lincoln, NE: University of Nebraska Press, 1988), 130-132; Dunlay, Wolves for...Indians, Infants, and Infantry: Andrew and Elizabeth Burt on the Frontier. Lincoln, NE: University of Nebraska Press, 1988. Morgan, Patrick. "How

  20. Mineral insulated thermocouples - installation in steam generating plant

    International Nuclear Information System (INIS)

    Bridges, W.J.; Brown, J.F.

    1980-01-01

    The main areas of interest considered are Central Station Fossil Fuel fired boilers of around 500 MW capacity, AGR Boilers, and Industrial and Research Development projects. While the requirement for temperature measurement in each of these areas may vary the techniques adopted to overcome installation and protection problems created by thermal, chemical and mechanical hazards remain basically the same. The reasons for temperature measurement are described together with methods of attachment development and procedures for protection of the thermocouple along its route length until its exit from the hazardous environment. These relative accuracies of the different attachments are discussed along with factors influencing the life of the thermocouple. In many instances thermocouple installation is either a once only opportunity and/or an expensive exercise. It is therefore essential to develop and apply an effective quality control system during the installation phase. An effective system is described. Finally, a brief outline of possible future trends is given. (author)

  1. Reduction of Dynamic Loads in Mine Lifting Installations

    Science.gov (United States)

    Kuznetsov, N. K.; Eliseev, S. V.; Perelygina, A. Yu

    2018-01-01

    Article is devoted to a problem of decrease in the dynamic loadings arising in transitional operating modes of the mine lifting installations leading to heavy oscillating motions of lifting vessels and decrease in efficiency and reliability of work. The known methods and means of decrease in dynamic loadings and oscillating motions of the similar equipment are analysed. It is shown that an approach based on the concept of the inverse problems of dynamics can be effective method of the solution of this problem. The article describes the design model of a one-ended lifting installation in the form of a two-mass oscillation system, in which the inertial elements are the mass of the lifting vessel and the reduced mass of the engine, reducer, drum and pulley. The simplified mathematical model of this system and results of an efficiency research of an active way of reduction of dynamic loadings of lifting installation on the basis of the concept of the inverse problems of dynamics are given.

  2. Nuclear medicine installations supervisors interactive course (CD-ROM)

    International Nuclear Information System (INIS)

    Williart, A.; Shaw, M.; Tellez, M.

    2000-01-01

    The professionals who work as Nuclear Medicine Installations Supervisors need a suitable training. This training must be based on the guidelines of the C.S.N. (the Spanish Agency for Nuclear Safety). The traditional training courses must comply with a set of requirements, that not always is possible to get: They are given in a settled place. They are developed during a time, more or less lengthy. This time is pre-established. However, the persons willing to follow these courses have some difficulties with the place and the time. Many of them do not live near the places where the courses are given, in general in big cities, while there are Nuclear Medicine Installations scattered through all Spain. Moreover in some occasions they have not available time to attend the courses. Many times, faced with so many obstacles, the option is not to do the suitable training course. In order to solve this kind of problems we offer an Interactive Training Course (supported by CD-ROM). The course contents are based on Spanish Regulations and on the Safety Guide, established by C.S.N., for approval Radioactive Installations Supervisors Training Courses. This guide includes General Topics for Radioactive Installations and Specific Subjects for Nuclear Medicine. (General topics) Basic knowledge on the fundamental concepts on the action and nature of Ionizing Radiations, their risks and preventions. The ionizing radiations. Biological effects of ionizing radiations. Radiological protection. Legislation on radioactive installations. (Specific Subjects) Knowledge on the radiological risks associated to the proper techniques in the specific field of application. In our case the specific field is Nuclear Medicine Installations, where the radioactive sources are used for diagnostic or for therapy. Specific legal and administrative aspects. Non-encapsulated radioactive sources. Associated radiological risks to the use of non-encapsulated sources. Installations design. Operative procedures

  3. Remote installation of risers on underground nuclear waste storage tanks

    International Nuclear Information System (INIS)

    Jackson, J.P.; Gessner, R.F.

    1988-03-01

    The West Valley Demonstration Project was established to solidify 2120 m 3 (560,000) gallons of high-level nuclear waste generated during six years of commercial nuclear fuel reprocessing. This liquid will be processed to remove radioactive elements which, with the remaining sludge, will be combined with glass formers and be converted into borosilicate glass. Risers were installed on the high-level tank for installation of pumps which will be used to remove the liquid and sludge. The extensive use of remote technology was required to install the risers and to minimize operator exposure to high levels of radiation and contamination. The riser installation required remotely: drilling through two feet of concrete shielding; installing pump access pipes which are welded to the tank top; and cutting holes in tanks located 3658 mm (12) feet below ground. These operations were successfully completed 13 times without exposing personnel to high-level radiation or contamination. Specially designed remote equipment was developed for each step of this operation. Extensive operator training in the use of this equipment was performed on a tank with low radiation prior to work on the high-level tank. This paper discusses the application of remote technology that assured a quality job was safely accomplished. 3 refs., 18 figs., 2 tabs

  4. Remote handling installation of diagnostics in the JET Tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Allan, P., E-mail: Peter.Allan@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Loving, A.B. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Omran, H. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom); Collins, S.; Thomas, J. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); CCFE, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Parsloe, A.; Merrigan, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); British Nuclear Services, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Hassall, I. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Oxford Technologies Ltd, 7 Nuffield Way, Abingdon OX14 1RJ (United Kingdom)

    2011-10-15

    The requirement for an upgrade of the diagnostics for the JET ITER Like Wall (ILW) while maintaining personnel exposure to contamination as low as reasonably practicable or ALARP, has necessitated the development of a bespoke set of diagnostic components. These components, by virtue of their design and location, require a versatile yet comprehensive suite of remote handling tools to undertake their in-vessel installation. The installation of the various diagnostic components is covered in multiple tasks. Each task requires careful assessment and design of tools that can successfully interface with the components and comply with the handling and installation requirements. With remote maintenance a requirement, the looms/conduits were designed to be modular with connections which are electrically connected when the module is fitted or conversely disconnected when removed. The shape of each complex and often bulky component is verified during the design phase, to ensure that it can be delivered and installed to its specified location in the torus. This is done by matching the kinematic capabilities of the remote handling system and the path of the component through the torus by using a state of the art virtual reality system.

  5. CERN firefighters have got your back covered

    CERN Multimedia

    The Fire Brigade

    2011-01-01

    There’s not much room in the centre of a detector. Ensuring the safety of technicians who have to work on components close to the collision point is an absolute priority. With this firmly in mind, the Fire Brigade has recently acquired a back immobilisation device known as a spine splint.   CERN firefighters show off their new spine splint. Conscious of the potential safety hazards for personnel working on ALICE’s inner detectors, the collaboration’s GLIMOS, Fernando Pedrosa, asked the Fire Brigade to organise an exercise in March to simulate the emergency evacuation of a person from the centre of the detector. Despite the exceptionally limited space available in the centre of ALICE, the Fire Brigade successfully met the challenge. However, although specially designed for emergency evacuations, the cumbersome dimensions of the stretcher used in this first exercise caused many problems.   Following the exercise, the Fire Brigade therefore inves...

  6. Full metal jacket!

    CERN Document Server

    Laëtitia Pedroso

    2011-01-01

    Ten years ago, standard issue clothing only gave CERN firemen partial protection but today our fire-fighters are equipped with state-of-the-art, full personal protective equipment.   CERN's Fire Brigade team. For many years, the members of CERN's Fire Brigade went on call-outs clad in their work trousers and fire-rescue coats, which only afforded them partial protection. Today, textile manufacturing techniques have moved on a long way and CERN's firemen are now kitted out with state-of-the-art personal protective equipment. The coat and trousers are three-layered, comprising fire-resistant aramide, a protective membrane and a thermal lining. The CERN Fire Brigade' new state-of-the-art personal protection equipment. "This equipment is fully compliant with the standards in force and is therefore resistant to cuts, abrasion, electrical arcs with thermal effects and, of course, fire," explains Patrick Berlinghi, the CERN Fire Brigade's Logistics Officer. You might think that su...

  7. Topographic map analysis to determine Arjuno-Welirang volcanostratigraphy and implication for geothermal exploration

    Science.gov (United States)

    Apriani, Lestari; Satriana, Joshua; Aulian Chalik, Citra; Syahputra Mulyana, Reza; Hafidz, Muhammad; Suryantini

    2017-12-01

    Volcanostratigraphy study is used for supporting geothermal exploration on preliminary survey. This study is important to identify volcanic eruption center which shows potential area of geothermal heat source. The purpose of volcanostratigraphy study in research area is going to distinguish the characteristics of volcanic eruption product that construct the volcanic body. The analysis of Arjuno-Welirang volcanostratigraphy identification are based on topographic maps of Malang sheet with 1:100.000 scale, 1:50.000 scale, and a geological map. Regarding to the delineation of ridge and river, we determine five crowns, three hummocks, one brigade and one super brigade. The crowns consist of Ringgit, Welirang, Arjuno, Kawi, and Penanggungan, the hummocks comprise of Kembar III, Kembar II, and Kembar I, the brigade is Arjuno-Welirang, and the super brigade is Tengger. Based on topographic map interpretation and geothermal prospect evaluation method analysis, shows that Arjuno-Welirang prospect area have good geothermal resource potential.

  8. A statistical evaluation of formation disturbance produced by well- casing installation methods

    Science.gov (United States)

    Morin, R.H.; LeBlanc, D.R.; Teasdale, W.E.

    1988-01-01

    Water-resources investigations concerned with contaminant transport through aquifers comprised of very loose, unconsolidated sediments have shown that small-scale variations in aquifer characteristics can significantly affect solute transport and dispersion. Commonly, measurement accuracy and resolution have been limited by a borehole environment consisting of an annulus of disturbed sediments produced by the casing-installation method. In an attempt to quantify this disturbance and recognize its impact on the characterization of unconsolidated deposits, three installation methods were examined and compared in a sand-and-gravel outwash at a test site on Cape Cod, Massachusetts. These installation methods were: 1) casing installed in a mud-rotary hole; 2) casing installed in an augered hole; and 3) flush-joint steel casing hammer-driven from land surface. Fifteen wells were logged with epithermal neutron and natural gamma tools. Concludes that augering is the most disruptive of the three casing-installation methods and that driving casing directly, though typically a more time-consuming operation, transmits the least amount of disturbance into the surrounding formation. -from Authors

  9. Nuclear installations and childhood cancer in the U.K

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1990-01-01

    The report in November 1983 of a cluster of childhood leukemia cases in the vicinity of the Sellafield (Windscale) nuclear facility on the west coast of England has led to a substantial effort to study possible excess cancer in the vicinity of British nuclear installations. Although some additional excesses were found, the causal relationship with radionuclides was thought unlikely because the estimated doses were below those established as causal of increase in human leukemia. Since 1956, we have known that diagnostic x-rays during pregnancy are associated with increased risks from childhood cancer, especially leukemia. Gardner et al. showed that excess cases near Sellafield were in children born there, and no excess occurred among in-migrants. Roman et al. showed that significant elevations in leukemia among children living near three nuclear installations in the Midlands were only at 0-5 y, suggesting that the relevant exposure was prenatal. We identify and discuss a set of epidemiological, dosage estimation, and modeling problems relevant to interpretation of such data. We conclude that: (1) a red bone marrow-based model for brief, high-level exposures of adults associated with myelogenous leukemia is inappropriate for evaluating the impact of internal emitters, relatively continuous exposures in perinatal periods in association with acute lymphatic leukemia; (2) incidence of mortality rates of childhood leukemia should be evaluated in the vicinity of nuclear installations in many countries; and (3) in contrast to nuclear reprocessing and nuclear weapons installations, there is little evidence of excess childhood leukemia among residents in areas adjacent to nuclear power installations in the U.K

  10. Installation of concrete expansion anchors at the Fast Flux Test Facility

    International Nuclear Information System (INIS)

    Clark, G.L.

    1980-01-01

    Installation criteria utilized at the Fast Flux Test Facility for concrete expansion anchors are presented. Static and dynamic load capabilities of various anchor types are discussed in relation to design loads, with particular emphasis placed on the yield load (the proportional limit). Effects of several variables (i.e., installation torque, hole diameter) are also investigated. Resolution and documentation of field problems (e.g., improper spacing, embedment, angularity) are also described. Recommendations for improving and controlling future installations are given

  11. Development of cryogenic installations for large liquid argon neutrino detectors

    CERN Document Server

    Adamowski, M; Geynisman, M; Hentschel, S; Montanari, D; Nessi, M; Norris, B

    2015-01-01

    A proposal for a very large liquid argon (68,000 kg) based neutrino detector is being studied. To validate the design principles and the detector technology, and to gain experience in the development of the cryostats and the cryogenic systems needed for such large experiments, several smaller scale installations will be developed and implemented, at Fermilab and CERN. The cryogenic systems for these installations will be developed, constructed, installed and commissioned by an international engineering team. These installations shall bring the required cooling power under specific conditions to the experiments for the initial cool-down and the long term operation, and shall also guarantee the correct distribution of the cooling power within the cryostats to ensure a homogeneous temperature distribution within the cryostat itself. The cryogenic systems shall also include gaseous and liquid phase argon purification devices to be used to reach and maintain the very stringent purity requirements needed for these...

  12. Solution for Improve the Efficiency of Solar Photovoltaic Installation

    Directory of Open Access Journals (Sweden)

    Petru Chioncel

    2013-01-01

    Full Text Available This paper present a solution for improving efficiency of solar photovoltaic installation, realized with fixed solar photovoltaic modules, placed in solar parks or individual installations. The proposed solution to increase the radiation on the solar photovoltaic panels is to use some thin plates covered with a reflective blanket, mounted in front of the solar photovoltaic modules, with the possibility of their adjustment.

  13. Drones and safety of nuclear installations

    International Nuclear Information System (INIS)

    Tourneur, Jean-Claude

    2015-01-01

    Recent flyovers of French nuclear power plants by drones or UAVs (the owners of these drones could not be identified) has made the safety of these nuclear installations a matter of concern. These events also raised the question of balance between secret and information about these installations. The French Parliamentary Office for the Assessment of Scientific and Technological Choices (OPECST) organised two sets of hearings, a confidential one with people in charge of information related to national defence and security, and a public one opened to all stakeholders. This article briefly reports and discusses the results of these hearings. It appeared that these flyovers are not really a threat, are more a communication action than anything else. Suggestions have been made for the development of researches in the field of drone detection, and also for evolutions of French legislation on drones

  14. Integrated installation for offshore wind turbines

    Energy Technology Data Exchange (ETDEWEB)

    Way, J.; Bowerman, H.

    2003-07-01

    A project to investigate the feasibility of integrating the offshore installation of foundation, turbine and tower for offshore wind turbines into one operation is described. Three separate objectives are listed. They are: (1) Telescopic tower study - reversible process incorporating lift and lock mechanisms; (2) Transportation study - technical and economic feasibility of transporting and installing a wind turbine unit via a standard barge with minimal conversion and (3) Self-burial system study - to demonstrate the feasibility of self burial of a slab foundation via controlled jetting beneath the slab. The background to the study and the proposed concepts are discussed. The work carried out to date and the costs are reported together with the findings. Recommendations for future work are listed. The work was carried out by Corus UK Ltd and is managed by Future Energy Solutions for the DTI.

  15. Influence of matrix attachment installation load on movement and resultant forces in implant overdentures.

    Science.gov (United States)

    Goto, Takaharu; Nagao, Kan; Ishida, Yuichi; Tomotake, Yoritoki; Ichikawa, Tetsuo

    2015-02-01

    This in vitro study investigated the effect of attachment installation conditions on the load transfer and denture movements of implant overdentures, and aims to clarify the differences among the three types of attachments, namely ball, Locator, and magnet attachments. Three types of attachments, namely ball, Locator, and magnetic attachments were used. An acrylic resin mandibular edentulous model with two implants placed in the bilateral canine regions and removable overdenture were prepared. The two implants and bilateral molar ridges were connected to three-axis load-cell transducers, and a universal testing machine was used to apply a 50 N vertical force to each site of the occlusal table in the first molar region. The denture movement was measured using a G(2) motion sensor. Three installation conditions, namely, the application of 0, 50, and 100 N loads were used to install each attachment on the denture base. The load transfer and denture movement were then evaluated. The resultant force decreased with increasing installation load for all attachments. In particular, the resultant force on implants on the loading side of the Locator attachment significantly decreased when the installation load was increased from 0 to 50 N, and that for magnetic attachment significantly decreased when the installation load was increased from 50 to 100 N. For the residual ridges on the loading side, the direction of the forces for all attachments changed to downward with increasing installation load. Furthermore, the yaw Euler angle increased with increasing installation load for the magnetic attachment. Subject to the limitations of this study, the use of any installation load greater than 0 N is recommended for the installation of ball and Locator attachments on a denture base. Regarding magnetic attachments, our results also recommend installation on a denture base using any installation load greater than 0 N, and suggest that the resultant force acting on the implant can be

  16. ELABORATION OF NOT LARGE MOBILE MODULAR INSTALLATION ''AQUA - EXPRESS'' (300 L/H) FOR LRW CLEANING

    International Nuclear Information System (INIS)

    Karlin, Yurii; Dmitriev, Sergey; Iljin, Vadim; Ojovan, Mihail; Burcl, Rudolf

    2003-01-01

    Mobile modular installation ''Aqua-Express'' is a liquid low level and intermediate level radioactive waste (LL and ILRW) treatment facility, intended for not large research centers and other organizations, which activity causes the formation of a few quantity (up to 500 m3/year) of low and intermediate level radioactive waste water. Mobile modular installation ''Aqua-Express'' has the following features: (1) filtration, sorption and ultrafiltration units are used for LL and ILRW purification; (2) installation ''Aqua-Express'' consists of a cascade of three autonomous aqueous liquid waste-purifying installations; (3) installation ''Aqua-Express'' is a mobile installation; the installation can be transported by car, train, ship, or plane, as well as placed in a standard transport (sea or railway) container; (4) installation ''Aqua-Express'' does not includes any technological equipment for conditioning the secondary radioactive waste. Productivity of the installation ''Aqua-Express'' by purified water depends on composition of the initial liquid waste and makes up to 300 l/h. In present report is described the design of installation ''Aqua-Express'', theory of LRW purification in the installation ''Aqua-Express'' and some results of its use at cleaning real radioactive waters at State unitary enterprise - MosNPO ''Radon''

  17. Design basis and requirements for 241-SY modular exhauster mechanical installation

    International Nuclear Information System (INIS)

    Kriskovich, J.R.

    1994-01-01

    A new ventilation system is being installed to serve as the K-1 primary exhauster. The existing K-1 primary exhauster will then become the backup. This ventilation system services waste tanks 241-SY-101, 102 and 103. The nominal flow rate through the ventilation system is 1,000 cfm. The new ventilation system will contain a moisture eliminator, a heater, a prefilter, two stages of HEPA filtration, an exhaust fan, a stack and stack sampling system. The purpose of this document is to serve as the design and functional requirements for the mechanical installation of the new 241-SY modular exhauster. The mechanical installation will include modifying the existing ductwork (i.e., installing a ''T'' to connect the new exhauster to the existing system), modifying the existing condensate drain lines to accommodate the new lines associated with the new exhauster, a maintenance platform near the stack of the new exhauster, guy wires and guy wire footings to support the stack of the new exhauster, as well as other miscellaneous tasks associated with the mechanical installation design effort

  18. Programmable DSP-based multi-bunch feedback--operational experience from six installations

    International Nuclear Information System (INIS)

    Fox, J.; Prabhakar, S.; Teytelman, D.; Young, A.; Stover, G.; Drago, A.; Serio, M.; Khan, S.; Knuth, T.; Kim, Y.; Park, M.

    2000-01-01

    A longitudinal instability control system, originally developed for the PEP-II, DAΦNE and ALS machines has in the last two years been commissioned for use at the PLS and BESSY-II light sources. All of the installations are running identical hardware and use a common software distribution package. This common structure is beneficial in sharing expertise among the labs, and allows rapid commissioning of each new installation based on well-understood diagnostic and operational techniques. While the installations share the common instability control system, there are significant differences in machine dynamics between the various colliders and light sources. These differences require careful specification of the feedback algorithm and system configuration at each installation to achieve good instability control and useful operational margins. This paper highlights some of the operational experience at each installation, using measurements from each facility to illustrate the challenges unique to each machine. Our experience on the opportunities and headaches of sharing development and operational expertise among labs on three continents is also offered

  19. Design, Fabrication and Installation of the Charcoal Filter Housing in RIPF

    International Nuclear Information System (INIS)

    Kim, Min Jin; Lim, I. C.; Bang, H. S.

    2008-05-01

    In the Hot Cell Bank 3 of the Radioisotope Production Facility, production and dispense of I-131 solution and capsule that are used for the diagnosis and treatment of thyroid cancer are made. The original charcoal filter housings installed in 1994 and were utilized until the leakage of a very small amount of radio-iodine was found due to the erroneous installation of the charcoal filter in the filter housing. Thus the production of I-131 was discontinued until the repair and performance testing of the filter housing and the inspection by the regulatory body were finished. Although the production of I-131 was resumed, there was a desire for installing the brand-new charcoal filter housing which has an intrinsically safe design and no possibility of leakage. This report describes the design, fabrication and installation of brand-new charcoal filter housing. And also were described the dismantlement of the old housings, the assessment of the structural integrity of the shielding concrete wall and the installation of the shielding doors

  20. SNRIU nuclear installation modifications

    International Nuclear Information System (INIS)

    Goroshanskyi, Andrii

    2013-01-01

    Design stages of Nuclear Instalations (NI): NI design is performed in three stages: • Feasibility study: - Feasibility study is developed on the basis of the customer task for production facilities and linear facilities engineering and transport infrastructure that require detailed study of relevant decisions and identify options for and feasibility of construction. • Design: - The design is developed on the basis of design task, initial data and approved the previous stage under three-stage design. • Detailed documentation

  1. Memorandum of Understanding on cooperation and consultation on nuclear installations near borders

    International Nuclear Information System (INIS)

    1977-01-01

    This Agreement signed on 27 September 1977 lays down that the Contracting Parties will inform each other about all nuclear installations constructed along the common border. Nuclear installations within the meaning of the Agreement are installations for the production, processing, reprocessing, manufacture or fission of nuclear fuels and radioactive waste storage. The information to be communicated includes plans and decisions on siting, construction and operation of such installations and relevant documents. The Agreement provides for consultation between the Parties on safety aspects and lays down in detail all the conditions for communication of information. (NEA) [fr

  2. Compact activation detectors for measuring of neutron emission on plasma focus installations

    International Nuclear Information System (INIS)

    Krokhin, O.N.; Nikulin, V.Ya.; Peregudova, E.V.; Volobuev, I.V.

    2005-01-01

    The paper presents the two compact simple systems for the measurement of the absolute neutron yield in the range 10 6 - 10 12 neutrons/pulse and higher and spatial anisotropy of neutron radiation. The systems are destined for the registration of the short duration neutron radiation of the pulsed plasma installations, such as Plasma Focus (PF), z-pinches and others plasma installations. This paper also includes the results of the neutron emission measurements on different PF installations: 'Tulip' (P.N. Lebedev Physical Institute, Moscow Russia), the PF-1000 and PF-150 installations (Institute of Plasma Physics and Laser Microfusion, Warsaw, Poland)

  3. Horn installed in CNGS tunnel

    CERN Multimedia

    Maximilien Brice

    2005-01-01

    The horn is installed for the CERN Neutrinos to Gran Sasso (CNGS) project. Protons collide with a graphite target producing charged particles that are focussed by the magnetic field in the horn. These particles will then pass into a decay tube where they decay into neutrinos, which travel towards a detector at Gran Sasso 732 km away in Italy.

  4. Solar Water Heater Installation Package

    Science.gov (United States)

    1982-01-01

    A 48-page report describes water-heating system, installation (covering collector orientation, mounting, plumbing and wiring), operating instructions and maintenance procedures. Commercial solar-powered water heater system consists of a solar collector, solar-heated-water tank, electrically heated water tank and controls. Analysis of possible hazards from pressure, electricity, toxicity, flammability, gas, hot water and steam are also included.

  5. Installation, care, and maintenance of wood shake and shingle siding

    Science.gov (United States)

    Jack Dwyer; Tony Bonura; Arnie Nebelsick; Sam Williams; Christopher G. Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shakes and shingles. The authors gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle siding, and interviews with experts having...

  6. Training and certification of PV installers in Europe

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Tournaki, Stavroula; Gkouskos, Zacharias; Masson, Gaetan; Holden, John; Huidobro, Ana; Stoykova, Evelina; Rata, Camelia; Bacan, Andro; Maxoulis, Christos; Charalambous, Anthi

    2013-01-01

    The European strategy for the coming decades sets specific targets for a sustainable growth, including reaching a 20% share of renewables in final energy consumption till 2020. To achieve this target, a number of initiatives and measures have been in force. Europe, is currently the largest market for PV systems with more than 75% of the annual worldwide installations in 2011. The favourable European policies as well as the Member States’ supporting legislations have resulted in high market growth for photovoltaics. Applying PV technologies however, requires high qualified technicians to install, repair and maintain them. Until today, national markets have been growing faster than the skilled PV installers force can satisfy. The PVTRIN, an Intelligent Energy Europe action, addresses these issues by developing a training and certification scheme for technicians active in the installation and maintenance of small scale PV systems. During the implementation of the action, a market research was conducted in the six participating countries in order to record the stakeholders’ attitudes, perceptions and considerations and to adapt the training methods, tools and materials to the national PV industry requirements and markets’ needs. Indicative results of this analysis as well as the current situation regarding relevant training and certification schemes are presented in this paper. - Highlights: ► Market research in six EU countries on PV professional Training and Certification needs. ► PVTRIN scheme integrates the national legislations and the market's needs. ► The different aspects (technical, institutional, financial) are presented

  7. Nuclear installations and childhood cancer in the UK

    International Nuclear Information System (INIS)

    Goldsmith, J.R.

    1992-01-01

    Data on cancer incidence and mortality near nuclear installations in England and Wales have been published, covering the period 1959-1980. Several age classes and a number of cancer sites have been included. Systematic analysis has so far been limited to cancer mortality. This suggests that childhood leukemia is unusually frequent near some types of installations and the excess is greater for years 0-9 than for later ages. In the earlier decade, 1959-1969, there was questionable consistency of incidence reporting. This report uses the incidence and mortality data only for the period 1971-1980; leukemia and non-leukemia cancer data for those 0-9 years are analyzed, and consistency of incidence reporting is evaluated by comparing incidence and mortality. For comparison with reported data for grouped local authority areas (LAAs) near to 21 different installations, 2 sources of expected incidence are used. The first is based on regional data, and the second is based on a group of LAAs similar in location, urban/rural character and population size. The results of this study confirm Cook-Mozaffari et al.'s findings by mortality analysis for the group of installations involved in non-power producing nuclear technology. This study sheds no light on the possible basis for the association, which remains to be clarified. Initial steps have been taken by Gardner et al. using case-referent methods. (author). 15 refs., 3 figs., 7 tabs

  8. Installation of a Roof Mounted Photovoltaic System

    Science.gov (United States)

    Lam, M.

    2015-12-01

    In order to create a safe and comfortable environment for students to learn, a lot of electricity, which is generated from coal fired power plants, is used. Therefore, ISF Academy, a school in Hong Kong with approximately 1,500 students, will be installing a rooftop photovoltaic (PV) system with 302 solar panels. Not only will these panels be used to power a classroom, they will also serve as an educational opportunity for students to learn about the importance of renewable energy technology and its uses. There were four different options for the installation of the solar panels, and the final choice was made based on the loading capacity of the roof, considering the fact that overstressing the roof could prove to be a safety hazard. Moreover, due to consideration of the risk of typhoons in Hong Kong, the solar panel PV system will include concrete plinths as counterweights - but not so much that the roof would be severely overstressed. During and after the installation of the PV system, students involved would be able to do multiple calculations, such as determining the reduction of the school's carbon footprint. This can allow students to learn about the impact renewable energy can have on the environment. Another project students can participate in includes measuring the efficiency of the solar panels and how much power can be produced per year, which in turn can help with calculate the amount of money saved per year and when we will achieve economic parity. In short, the installation of the roof mounted PV system will not only be able to help save money for the school but also provide learning opportunities for students studying at the ISF Academy.

  9. DefenseLink.mil - Special Report - Soldiers Train with Non-lethal Weapons

    Science.gov (United States)

    Spc. Yevgeniy Popov, a chemical warfare specialist with Headquarters and Headquarters Company, 3rd warfare specialist with Headquarters and Headquarters Company, 3rd Special Troops Battalion, 3rd Brigade , center, a combat engineer with Company A, 3rd Special Troops Battalion, 3rd Brigade Combat Team, 10th

  10. 30 CFR 817.180 - Utility installations.

    Science.gov (United States)

    2010-07-01

    ... PERMANENT PROGRAM PERFORMANCE STANDARDS PERMANENT PROGRAM PERFORMANCE STANDARDS-UNDERGROUND MINING ACTIVITIES § 817.180 Utility installations. All underground mining activities shall be conducted in a manner...; oil, gas, and coal-slurry pipelines, railroads; electric and telephone lines; and water and sewage...

  11. Protection of civilian nuclear installations in time of armed conflict

    International Nuclear Information System (INIS)

    Lamm, V.

    2003-01-01

    The inclusion of article 56 in Protocol 1 of the Geneva convention of 12 August 1949 represents a significant achievement in the development of international humanitarian law. Article 56 of protocol 1 reads as follow: firstly, works or installations containing dangerous forces, namely dams, dykes and nuclear electrical generating stations, shall not not be made the object of attack, even where these objects are military objectives, if such attack may cause the release of dangerous forces and consequent severe losses among the civilian population. Other military objectives located at or in the vicinity of these works or installations shall not be made the object of attack if such attack may cause the release of dangerous forces from the works or installations and consequent severe losses among the civilian population. Secondly, the special protection against attack provided by paragraph 1 shall cease: for a dam or a dyke only if it is used for other than its normal function and in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support; for a nuclear electrical generating station only if it provides electric power in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support;for other military objectives located at or in the vicinity of these works or installations only if they are used in regular, significant and direct support of military operations and if such attack is the only feasible way to terminate such support. Thirdly, in all cases, the civilian population and individual civilians shall remain entitled to all the protection accorded them by international law, including the protection of the precautionary measures provided for in article 57. If the protection ceases and any of the works, installations or military objectives mentioned in paragraph 1 is attacked, all practical precautions shall be taken to

  12. Transport and installation of the LHC cryo-magnets

    CERN Document Server

    Artoos, K; Capatina, O; Chevalley, JM; Foraz, K; Guinchard, M; Hauviller, Claude; Kershaw, K; Prodon, S; Rühl, Ingo; Trinquart, G; Weisz, S; Ponsot, P

    2007-01-01

    Eleven years have passed between the beginning of transport and handling studies in 1996 and the completion of the LHC cryo-magnets installation in 2007. More than 1700 heavy, long and fragile cryo-magnets had to be transported and installed in the 27 km long LHC tunnel with very restricted available space. The size and complexity of the project involved challenges in the field of equipment design and manufacturing, maintenance, training and follow-up of operators and logistics. The paper presents the milestones, problems to be overcome and lessons learned during this project.

  13. Thermal solar energy. Collective domestic hot water installations

    International Nuclear Information System (INIS)

    Garnier, Cedric; Chauvet, Chrystele; Fourrier, Pascal

    2016-01-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic outlook on the way to complete the installation of a collective domestic water solar heating system. After some recall of what is solar energy, the thermal solar technology and the energy savings it may induce, this document presents the main hydraulic configurations of a solar heating system with water storage, the dimensioning of a solar water heating system and its cost estimation, the installation and the commissioning of the system, the monitoring and maintenance operations

  14. Basis of conception for emergency plans of fuel cycle installations; Bases de conception des plans particuliers d`intervention des installations du cycle du combustible

    Energy Technology Data Exchange (ETDEWEB)

    Charles, T.; Mercier, J.P. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. d`Evaluation de Surete; Rzepka, J.P.; Dubiau, P.; Jouve, A.C. [CEA Centre d`Etudes de Fontenay-aux-Roses, 92 (France). Dept. de Protection de l`Environnement et des Installations

    1994-12-31

    In this text we give the principles on which the fuel cycle installations emergency plans are based. The bases are the inventory of toxic and radioactive materials contained in the installation, the credible accident and the source term, the atmospheric diffusion. On these terms the risk for population is evaluated and relocation or confinement of population is taken.

  15. Defense Infrastructure: DOD Efforts to Prevent and Mitigate Encroachment at Its Installations

    Science.gov (United States)

    2016-11-01

    installation size and projected population growth . What GAO Recommends GAO is not making recommendations in this report. DOD provided technical...Projected Population Growth at 33 Selected Installations (2015 to 2020) 32 Table 4: Summary of Benefits Reported by Readiness and Environmental...installation of interest because of the existence of or potential for future incompatible land use, and (4) projected population growth in adjacent

  16. Installation and validation of MCNP-4A

    International Nuclear Information System (INIS)

    Marks, N.A.

    1997-01-01

    MCNP-4A is a multi-purpose Monte Carlo program suitable for the modelling of neutron, photon, and electron transport problems. It is a particularly useful technique when studying systems containing irregular shapes. MCNP has been developed over the last 25 years by Los Alamos, and is distributed internationally via RSIC at Oak Ridge. This document describes the installation of MCNP-4A (henceforth referred to as MCNP) on the Silicon Graphics workstation (bluey.ansto.gov.au). A limited number of benchmarks pertaining to fast and thermal systems were performed to check the installation and validate the code. The results are compared to deterministic calculations performed using the AUS neutronics code system developed at ANSTO. (author)

  17. Idaho National Engineering Laboratory installation roadmap document

    International Nuclear Information System (INIS)

    1993-01-01

    The roadmapping process was initiated by the US Department of Energy's office of Environmental Restoration and Waste Management (EM) to improve its Five-Year Plan and budget allocation process. Roadmap documents will provide the technical baseline for this planning process and help EM develop more effective strategies and program plans for achieving its long-term goals. This document is a composite of roadmap assumptions and issues developed for the Idaho National Engineering Laboratory (INEL) by US Department of Energy Idaho Field Office and subcontractor personnel. The installation roadmap discusses activities, issues, and installation commitments that affect waste management and environmental restoration activities at the INEL. The High-Level Waste, Land Disposal Restriction, and Environmental Restoration Roadmaps are also included

  18. Installation, care, and maintenance of wood shake and shingle roofs

    Science.gov (United States)

    Tony Bonura; Jack Dwyer; Arnie Nebelsick; Brent Stuart; R. Sam Williams; Christopher Hunt

    2011-01-01

    This article gives general guidelines for selection, installation, finishing, and maintenance of wood shake and shingle roofs. The authors have gathered information from a variety of sources: research publications on wood finishing, technical data sheets from paint manufacturers, installation instructions for shake and shingle roofs, and interviews with experts having...

  19. Net Zero Energy Military Installations: A Guide to Assessment and Planning

    Energy Technology Data Exchange (ETDEWEB)

    Booth, S.; Barnett, J.; Burman, K.; Hambrick, J.; Westby, R.

    2010-08-01

    The U.S. Department of Defense (DoD) recognizes the strategic importance of energy to its mission, and is working to reduce energy consumption and enhance energy self-sufficiency by drawing on local clean energy sources. A joint initiative formed between DoD and the U.S. Department of Energy (DOE) in 2008 to address military energy use led to a task force to examine the potential for net zero energy military installations, which would produce as much energy on site as they consume in buildings, facilities, and fleet vehicles. This report presents an assessment and planning process to examine military installations for net zero energy potential. Net Zero Energy Installation Assessment (NZEIA) presents a systematic framework to analyze energy projects at installations while balancing other site priorities such as mission, cost, and security.

  20. VG-400 atomic power and technological installation. Possible core design

    International Nuclear Information System (INIS)

    Komarov, E.V.; Laptev, F.V.; Lyubivyj, A.G.; Mitenkov, F.M.; Samojlov, O.B.; Sukhachevskij, Yu.B.

    1979-01-01

    The main characteristics, basic circuit and configuration of equipment of the VG-400 atomic power and technological installation are considered. This installation is intended for supplying with highly-potential heat of thermal electrochemical hydrogen production and for power generation in the steam-turbine cycle. The main installation characteristics: HTGR reactor heat power 1100 MW, electric power 300 MW, helium coolant pressure 50 atm, output temperature 950 deg C, steam pressure in the second contour 175 atm, temperature 535 deg C, core diameter and height 6.4 m and 4 m, respectively, number of spherical fuel elements 8.5x10 5 . The installation can ensure hydrogen production of 10 5 Nxm 3 /h. For the VG-400 reactor block the integral arrangement of the first circuit equipment in the reinforced concrete is chosen. Two versions of the reactor core with prismatic and spherical fuel elements are compared. It is shown that taking into account great potentialities of the spherical zone in a case of further temperature increase and its positive qualities with respect to construction and processing of fuel elements and graphite blocks, the utilization of simplier units and mechanisms in the overloading system and in the process of profiling of energy distribution the choice of the spherical configuration for the VG-400 pilot plant installation seems to be valid