WorldWideScience

Sample records for include gain scheduling

  1. Gain scheduling using the Youla parameterization

    DEFF Research Database (Denmark)

    Niemann, Hans Henrik; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector has been derived by using the Youla parameterization. The use of...

  2. Gain scheduling using the youla parameterization

    DEFF Research Database (Denmark)

    Niemann, H.H.; Stoustrup, Jakob

    1999-01-01

    Gain scheduling controllers are considered in this paper. The gain scheduling problem where the scheduling parameter vector theta cannot be measured directly, but needs to be estimated is considered. An estimation of the scheduling vector theta has been derived by using the Youla parameterization...

  3. Gain Scheduling for the Orion Launch Abort Vehicle Controller

    Science.gov (United States)

    McNamara, Sara J.; Restrepo, Carolina I.; Madsen, Jennifer M.; Medina, Edgar A.; Proud, Ryan W.; Whitley, Ryan J.

    2011-01-01

    One of NASAs challenges for the Orion vehicle is the control system design for the Launch Abort Vehicle (LAV), which is required to abort safely at any time during the atmospheric ascent portion of ight. The focus of this paper is the gain design and scheduling process for a controller that covers the wide range of vehicle configurations and flight conditions experienced during the full envelope of potential abort trajectories from the pad to exo-atmospheric flight. Several factors are taken into account in the automation process for tuning the gains including the abort effectors, the environmental changes and the autopilot modes. Gain scheduling is accomplished using a linear quadratic regulator (LQR) approach for the decoupled, simplified linear model throughout the operational envelope in time, altitude and Mach number. The derived gains are then implemented into the full linear model for controller requirement validation. Finally, the gains are tested and evaluated in a non-linear simulation using the vehicles ight software to ensure performance requirements are met. An overview of the LAV controller design and a description of the linear plant models are presented. Examples of the most significant challenges with the automation of the gain tuning process are then discussed. In conclusion, the paper will consider the lessons learned through out the process, especially in regards to automation, and examine the usefulness of the gain scheduling tool and process developed as applicable to non-Orion vehicles.

  4. Gain scheduled linear quadratic control for quadcopter

    Science.gov (United States)

    Okasha, M.; Shah, J.; Fauzi, W.; Hanouf, Z.

    2017-12-01

    This study exploits the dynamics and control of quadcopters using Linear Quadratic Regulator (LQR) control approach. The quadcopter’s mathematical model is derived using the Newton-Euler method. It is a highly manoeuvrable, nonlinear, coupled with six degrees of freedom (DOF) model, which includes aerodynamics and detailed gyroscopic moments that are often ignored in many literatures. The linearized model is obtained and characterized by the heading angle (i.e. yaw angle) of the quadcopter. The adopted control approach utilizes LQR method to track several reference trajectories including circle and helix curves with significant variation in the yaw angle. The controller is modified to overcome difficulties related to the continuous changes in the operating points and eliminate chattering and discontinuity that is observed in the control input signal. Numerical non-linear simulations are performed using MATLAB and Simulink to illustrate to accuracy and effectiveness of the proposed controller.

  5. Adaptive Gain Scheduled Semiactive Vibration Control Using a Neural Network

    Directory of Open Access Journals (Sweden)

    Kazuhiko Hiramoto

    2018-01-01

    Full Text Available We propose an adaptive gain scheduled semiactive control method using an artificial neural network for structural systems subject to earthquake disturbance. In order to design a semiactive control system with high control performance against earthquakes with different time and/or frequency properties, multiple semiactive control laws with high performance for each of multiple earthquake disturbances are scheduled with an adaptive manner. Each semiactive control law to be scheduled is designed based on the output emulation approach that has been proposed by the authors. As the adaptive gain scheduling mechanism, we introduce an artificial neural network (ANN. Input signals of the ANN are the measured earthquake disturbance itself, for example, the acceleration, velocity, and displacement. The output of the ANN is the parameter for the scheduling of multiple semiactive control laws each of which has been optimized for a single disturbance. Parameters such as weight and bias in the ANN are optimized by the genetic algorithm (GA. The proposed design method is applied to semiactive control design of a base-isolated building with a semiactive damper. With simulation study, the proposed adaptive gain scheduling method realizes control performance exceeding single semiactive control optimizing the average of the control performance subject to various earthquake disturbances.

  6. Gain Scheduling of Observer-Based Controllers with Integral Action

    DEFF Research Database (Denmark)

    Trangbæk, Klaus; Stoustrup, Jakob; Bendtsen, Jan Dimon

    2006-01-01

     This paper presents a method for continuous gain scheduling of  observer-based controllers with integral action. Given two stabilising controllers for a given system, explicit state space formulae are presented, allowing to change gradually from one  controller to the other while preserving...

  7. Design of Gain Scheduling Control Using State Derivative Feedback

    Directory of Open Access Journals (Sweden)

    Lázaro Ismael Hardy Llins

    2017-01-01

    Full Text Available In recent years, the study of systems subject to time-varying parameters has awakened the interest of many researchers. The gain scheduling control strategy guarantees a good performance for systems of this type and also is considered as the simplest to deal with problems of this nature. Moreover, the class of systems in which the state derivative signals are easier to obtain than the state signals, such as in the control for reducing vibrations in a mechanical system, has gained an important hole in control theory. Considering those ideas, we propose sufficient conditions via LMI for designing a gain scheduling controller using state derivative feedback. The D-stability methodology was used for improving the performance of the transitory response. Practical implementation in an active suspension system and comparison with other methods validates the efficiency of the proposed strategy.

  8. Gain scheduling controller for pitch control of a TRMS system

    Science.gov (United States)

    Bhagyalakshmi, R.; Rashmi, GP; Jaganatha Pandian, B.

    2017-11-01

    Gain scheduling is a control technique which is applied for the control of non-linear systems by using a family of linear controllers at different operating points so as to increase the range of operation of the process. The dynamics of any nonlinear system changes with respect to operating points. These operating points are characterized by one or more variables known as scheduling variables. In such cases, we linearize the system at different equilibrium points. Due to the high amount of non-linearities and complexity in the aerodynamic design, modelling of other unmanned aerial vehicles have been replaced here with twin rotor system. The linearized system is then controlled by using PID controllers which are designed with respect to the obtained operating points. Linearizing of the non-linear system, designing and tuning of PID are being implemented using different MATLAB functions.

  9. Robust, Gain-Scheduled Control of Wind Turbines

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck

    Wind turbines are today large and efficient machines, which are combined into wind farms operating on par with conventional power plants. When looking back, this is significantly different from the status only a few years ago, when wind turbines were sold mainly to private people. This change...... in turbine owners has resulted in a new focus on operational reliability instead of turbine size. This research deals with investigating model-based gain-scheduling control of wind turbines by use of linear parameter varying (LPV) methods. The numerical challenges grow quickly with the model size...

  10. A Gain-Scheduling PI Control Based on Neural Networks

    Directory of Open Access Journals (Sweden)

    Stefania Tronci

    2017-01-01

    Full Text Available This paper presents a gain-scheduling design technique that relies upon neural models to approximate plant behaviour. The controller design is based on generic model control (GMC formalisms and linearization of the neural model of the process. As a result, a PI controller action is obtained, where the gain depends on the state of the system and is adapted instantaneously on-line. The algorithm is tested on a nonisothermal continuous stirred tank reactor (CSTR, considering both single-input single-output (SISO and multi-input multi-output (MIMO control problems. Simulation results show that the proposed controller provides satisfactory performance during set-point changes and disturbance rejection.

  11. Structured, Gain-Scheduled Control of Wind Turbines

    DEFF Research Database (Denmark)

    Adegas, Fabiano Daher

    2013-01-01

    Improvements in cost-effectiveness and reliability of wind turbines is a constant in the industry. This requires new knowledge and systematic methods for analyzing and designing the interaction of structural dynamics, aerodynamics, and controllers. This thesis presents novel methods and theoretical...... control developments, which contributes to the analysis and design of wind turbines in an integrated aeroservoelastic process. From a control point of view, a wind turbine is a challenging system since the wind, which is the energy source driving the machine, is a poorly known disturbance. Additionally......, wind turbines inherently exhibit time-varying nonlinear dynamics along their nominal operating trajectory, motivating the use of advanced control techniques such as gain-scheduling, to counteract performance degradation or even instability problems by continuously adapting to the dynamics of the plant...

  12. Gain Scheduling Control of an Islanded Microgrid Voltage

    Directory of Open Access Journals (Sweden)

    Haritza Camblong

    2014-07-01

    Full Text Available The aim of this research study has been to design a gain scheduling (GS digital controller in order to control the voltage of an islanded microgrid in the presence of fast varying loads (FVLs, and to compare it to a robust controller. The inverter which feeds the microgrid is connected to it through an inductance-capacitor-inductance (LCL filter. The oscillatory and nonlinear behaviour of the plant is analyzed in the whole operating zone. Afterwards, the design of the controllers which contain two loops in cascade are described. The first loop concerns the current control, while the second is linked to the voltage regulation. Two controllers, one defined as Robust and another one as GS controller, are designed for the two loops, emphasizing in their robustness and their ability to damp the oscillatory plant behaviour. To finish, some simulations are carried out to study and compare the two kinds of controllers in different operating points. The results show that both controllers damp the oscillatory behaviour of the plant in closed loop (CL, and that the GS controller ensures a better rejection of current disturbances from FVLs.

  13. An application of gain-scheduled control using state-space interpolation to hydroactive gas bearings

    DEFF Research Database (Denmark)

    Theisen, Lukas Roy Svane; Camino, Juan F.; Niemann, Hans Henrik

    2016-01-01

    , it is possible to design a gain-scheduled controller using multiple controllers optimised for a single frequency. Gain-scheduling strategies using the Youla parametrisation can guarantee stability at the cost of increased controller order and performance loss in the interpolation region. This paper contributes...... with a gain-scheduling strategy using state-space interpolation, which avoids both the performance loss and the increase of controller order associated to the Youla parametrisation. The proposed state-space interpolation for gain-scheduling is applied for mass imbalance rejection for a controllable gas...... bearing scheduled in two parameters. Comparisons against the Youla-based scheduling demonstrate the superiority of the state-space interpolation....

  14. Gain and exposure scheduling to compensate for photorefractive neural-network weight decay

    Science.gov (United States)

    Goldstein, Adam A.; Petrisor, Gregory C.; Jenkins, B. Keith

    1995-03-01

    A gain and exposure schedule that theoretically eliminates the effect of photorefractive weight decay for the general class of outer-product neural-network learning algorithms (e.g., backpropagation, Widrow-Hoff, perceptron) is presented. This schedule compensates for photorefractive diffraction-efficiency decay by iteratively increasing the spatial-light-modulator transfer function gain and decreasing the weight-update exposure time. Simulation results for the scheduling procedure, as applied to backpropagation learning for the exclusive-OR problem, show improved learning performance compared with results for networks trained without scheduling.

  15. Pengaturan Kecepatan Motor Spindle pada Retrofit Mesin Bubut CNC Menggunakan Kontroler PID Gain Scheduling

    Directory of Open Access Journals (Sweden)

    Fikri Yoga Permana

    2013-03-01

    Full Text Available Pada mesin bubut Computerized Numerical Control (CNC, proses pemahatan benda kerja memerlukan kecepatan potong yang tetap agar hasil kerja memiliki tingkat presisi tinggi. Dalam prakteknya, ketika terjadi pemotongan, diameter benda kerja akan selalu berkurang dan tingkat kedalaman pahat berubah-ubah sesuai dengan proses yang dilakukan sehingga mempengaruhi kecepatan putar motor spindle sehingga mengakibatkan tingkat presisi hasil kerja menjadi berkurang. Pada penelitian ini, digunakan kontroler PI Gain Scheduling untuk mengatur kecapatan motor spindle. Hasil yang didapatkan berupa simulasi kontroler PI Gain Scheduling. Dari hasil simulasi didapatkan kontroler PI Gain Scheduling mampu membuat respon sistem sesuai dengan yang diinginkan.

  16. Gain Scheduling of PID Controller Based on Fuzzy Systems

    Directory of Open Access Journals (Sweden)

    Singh Sandeep

    2016-01-01

    Full Text Available This paper aims to utilize fuzzy rules and reasoning to determine the controller parameters and the PID controller generates the control signal. The objective of this study is to simulate the proposed scheme on various processes and arrive at results providing better response of the system when compared with best industrial auto-tuning technique: Ziegler-Nichols. The proposed scheme is based upon the Ultimate Gain (Ku and the Period (Tu of the system. The error and rate of change in error gains are tuned manually to get the desired response using LabVIEW. This can also be done with various optimization techniques. A thumb rule for choosing the ranges for Kc, Kd and Ki has been obtained experimentally.

  17. A Modified Gain Schedulling Controller by Considering the Sparseness Property of UAV Quadrotors

    Directory of Open Access Journals (Sweden)

    M Qodar Abdurrohman

    2015-06-01

    Full Text Available This work presented the gain scheduling based LQR for Quadrotor systems. From the original nonlinear model, the system is always controllable and observable in various equilibrium points. Moreover, the linearized systems have a unique property that is known as sparse system. Hence, in order to implement the most efficient state feedback controller, post-filter and pre-filter were introduced to transform the state coordinate to decrease coupling between states. Finally, the gain scheduling systems using these facts was proposed. The system behavior was tested using the proposed controller. The numerical studies showed the effectiveness of the controller to achieve desired altitude, attitude, and its ability during the disturbance

  18. Gain-Scheduled Model Predictive Control of Wind Turbines using Laguerre Functions

    DEFF Research Database (Denmark)

    Adegas, Fabiano Daher; Wisniewski, Rafal; Larsen, Lars Finn Sloth

    2014-01-01

    This paper presents a systematic approach to design gain-scheduled predictive controllers for wind turbines. The predictive control law is based on Laguerre functions to parameterize control signals and a parameter-dependent cost function that is analytically determined from turbine data....... The approach can be utilized to the design of new controllers and to represent existing gain-scheduled controllers as predictive controllers. The numerical example and simulations illustrate the design of a speed controller augmented with active damping of the tower fore-aft displacement....

  19. Analysis of nonlinear systems with time varying inputs and its application to gain scheduling

    Directory of Open Access Journals (Sweden)

    J.-T. Lim

    1996-01-01

    Full Text Available An analytical framework for analysis of a class of nonlinear systems with time varying inputs is presented. It is shown that the trajectories of the transformed nonlinear systems are uniformly bounded with an ultimate bound under certain conditions shown in this paper. The result obtained is useful for applications, in particular, analysis and design of gain scheduling.

  20. Throughput Gain Using Threshold-Based Multiuser Scheduling in WiMAX OFDMA

    Directory of Open Access Journals (Sweden)

    Sulyman AhmedIyanda

    2011-01-01

    Full Text Available This paper presents the analysis of the throughput enhancement possible using threshold-based multiuser scheduling in WiMAX OFDMA. We consider a point-to-multipoint (PMP WiMAX network where base station (BS schedules downlink packets for simultaneous transmissions to multiple users using the WiMAX OFDMA system. WiMAX OFDMA standard specifies several subcarrier permutation options, such as the partial usage of subcarriers (PUSC, full usage of subcarrier (FUSC, and the band adaptive modulation and coding (band-AMC among others, for mapping the physical subcarriers into logical subchannels assigned to users by the BS schedulers. In this paper, we propose the use of threshold testing prior to the process of subchannel assignment to users by the BS scheduler, as a means of throughput enhancement. In the proposed threshold-based multiuser scheduling scheme, the BS scheduler selects at any time instant users whose channel gains in the available subchannels equal or exceed a predetermined energy threshold. Thus, only users who can maximize BS throughput on the available subchannels are assigned data transmission opportunities which enhance the BS data rate, albeit at the expense of fairness to users. We quantify the throughput enhancement of the proposed system and illustrate its benefits by numerical simulations.

  1. Robust Model Predictive Control of a Nonlinear System with Known Scheduling Variable and Uncertain Gain

    DEFF Research Database (Denmark)

    Mirzaei, Mahmood; Poulsen, Niels Kjølstad; Niemann, Hans Henrik

    2012-01-01

    Robust model predictive control (RMPC) of a class of nonlinear systems is considered in this paper. We will use Linear Parameter Varying (LPV) model of the nonlinear system. By taking the advantage of having future values of the scheduling variable, we will simplify state prediction. Because...... of the special structure of the problem, uncertainty is only in the B matrix (gain) of the state space model. Therefore by taking advantage of this structure, we formulate a tractable minimax optimization problem to solve robust model predictive control problem. Wind turbine is chosen as the case study and we...... choose wind speed as the scheduling variable. Wind speed is measurable ahead of the turbine, therefore the scheduling variable is known for the entire prediction horizon....

  2. Gain-scheduled Linear Quadratic Control of Wind Turbines Operating at High Wind Speed

    DEFF Research Database (Denmark)

    Østergaard, Kasper Zinck; Stoustrup, Jakob; Brath, Per

    2007-01-01

    This paper addresses state estimation and linear quadratic (LQ) control of variable speed variable pitch wind turbines. On the basis of a nonlinear model of a wind turbine, a set of operating conditions is identified and a LQ controller is designed for each operating point. The controller gains...... are then interpolated linearly to get a control law for the entire operating envelope. A nonlinear state estimator is designed as a combination of two unscented Kalman filters and a linear disturbance estimator. The gain-scheduling variable (wind speed) is then calculated from the output of these state estimators...

  3. A wavelet neural network based on genetic algorithm and its application to gain scheduling flight control

    Science.gov (United States)

    Sun, Xun; Zhang, Weiguo; Yin, Wei; Li, Aijun

    2006-11-01

    As enlarging of the flight envelop, the aerodynamic derivative of the airplane varies enormous. The gain scheduling method is usually used to deal with it. But the workload is enormously and the stability is difficulty to be assured. To solve the above problem, a large envelope wavelet neural network gain scheduling flight control law design method based on genetic algorithm is presented in this paper. Wavelet has good time accuracy in high frequency-domain and the good frequency accuracy in low frequency-domain. Neural network has the self-learning character. In this method, wavelet function instead of Sigmoid function as the excitation function. So the two merits are merged and the high nonlinear function approximation capability could be achieved. In order to obtain higher accuracy and faster speed, genetic algorithm is used to optimize the parameters of the wavelet neural network. This method is used in design the large envelope gain scheduling flight control law. This simulation results show that good control capability could be achieved in large envelope and the system is still stable when modeling error is 20%. In the situation of 20% modeling error, the maximum overshoot is only 12m and it is 35% of the maximum overshoot using normal method.

  4. Two-user opportunistic scheduling using hierarchical modulations in wireless networks with heterogenous average link gains

    KAUST Repository

    Hossain, Md Jahangir

    2010-03-01

    Our contribution, in this paper, is two-fold. First, we analyze the performance of a hierarchical modulation-assisted two-best user opportunistic scheduling (TBS) scheme, which was proposed by the authors, in a fading environment where different users have different average link gains. Specifically, we present a new expression for the spectral efficiency (SE) of the users and using this expression, we compare the degrees of fairness (DOF) of the TBS scheme with that of classical single user opportunistic scheduling schemes, namely, absolute carrier-to-noise ratio (CNR) based single-best user scheduling (SBS) and normalized CNR based proportional fair scheduling (PFS) schemes. The second contribution is that we propose a new hybrid two-user opportunistic scheduling (HTS) scheme based on our earlier proposed TBS scheme. This HTS scheme selects the first user based on the largest absolute CNR value among all the users while the second user is selected based on the ratios of the absolute CNRs to the corresponding average CNRs of the remaining users. The total transmission rate i.e., the constellation size is selected according to the absolute CNR of the first best user. The total transmission rate is then allocated among these selected users by joint consideration of their absolute CNRs and allocated number of information bit(s) are transmitted to them using hierarchical modulations. Numerical results are presented for a fading environment where different users experience independent but non-identical (i.n.d.) channel fading. These selected numerical results show that the proposed HTS scheme can considerably increase the system\\'s fairness without any degradation of the link spectral efficiency (LSE) i.e., the multiuser diversity gain compared to the classical SBS scheme. These results also show that the proposed HTS scheme has a lower fairness in comparison to the PFS scheme which suffers from a considerable degradation in LSE. © 2010 IEEE.

  5. On the molluscan fauna of Lakshadweep included in various schedules of Wildlife (Protection Act of India

    Directory of Open Access Journals (Sweden)

    A. Bijukumar

    2015-05-01

    Full Text Available Out of the 24 species of marine molluscs included in Schedule I and IV of the Wildlife (Protection Act (WPA of India, 19 species were recorded from the coastal waters of Lakshadweep.  A recent survey conducted by the authors recorded the presence of 14 scheduled molluscs in Lakshadweep.  Scheduled species such as Placuna placenta (recorded from Kavaratti and Tudicla spirillus (recorded from Kalpeni are new records from Lakshadweep.  The paper provides details for taxonomic identification of scheduled molluscs and discusses strategies for conservation of scheduled molluscs of Lakshadweep. 

  6. Fuzzy gain scheduling of velocity PI controller with intelligent learning algorithm for reactor control

    International Nuclear Information System (INIS)

    Dong Yun Kim; Poong Hyun Seong; .

    1997-01-01

    In this research, we propose a fuzzy gain scheduler (FGS) with an intelligent learning algorithm for a reactor control. In the proposed algorithm, the gradient descent method is used in order to generate the rule bases of a fuzzy algorithm by learning. These rule bases are obtained by minimizing an objective function, which is called a performance cost function. The objective of the FGS with an intelligent learning algorithm is to generate gains, which minimize the error of system. The proposed algorithm can reduce the time and effort required for obtaining the fuzzy rules through the intelligent learning function. It is applied to reactor control of nuclear power plant (NPP), and the results are compared with those of a conventional PI controller with fixed gains. As a result, it is shown that the proposed algorithm is superior to the conventional PI controller. (author)

  7. Interpolating gain-scheduled H∞ loop shaping design for high speed ball screw feed drives.

    Science.gov (United States)

    Dong, Liang; Tang, WenCheng; Bao, DaFei

    2015-03-01

    This paper presents a method to design servo controllers for flexible ball screw drives with time-varying dynamics, which are mainly due to the time-varying table position and the workpiece mass. A gain-scheduled H∞ loop shaping controller is designed to achieve high tracking performance against the dynamic variations. H∞ loop shaping design procedure incorporates open loop shaping by a set of compensators to obtain performance/robust stability tradeoffs. The interpolating gain-scheduled controller is obtained by interpolating the state space model of the linear time-invariant (LTI) controllers estimated for fixed values of the scheduling parameters and a linear least squares problem can be solved. The proposed controller has been compared with P/PI with velocity and acceleration feedforward and adaptive backstepping sliding mode control experimentally. The experimental results indicate that the tracking performance has been improved and the robustness for time-varying dynamics has been achieved with the proposed scheme. Copyright © 2014 ISA. Published by Elsevier Ltd. All rights reserved.

  8. Nonlinear dynamic positioning of ships with gain-scheduled wave filtering

    DEFF Research Database (Denmark)

    Torsetnes, Guttorm; Jouffroy, Jerome; Fossen, Thor I.

    , slowly varying environmental disturbances (bias terms) and velocity. The estimates are automatically adjusted to the present sea state by gain-scheduling the wave model parameters in the observer. Finally, the estimates are used in a nonlinear PID control law and the stability proof of the observer-controller......This paper presents a globally contracting controller for regulation and dynamic positioning of ships, using only position measurements. For this purpose a globally contracting observer which reconstructs the unmeasured states is constructed. The observer produces accurate estimates of position...

  9. Gain-Scheduled ℋ2 Controller Synthesis for Continuous-Time Polytopic LPV Systems

    Directory of Open Access Journals (Sweden)

    Guangbin Cai

    2014-01-01

    Full Text Available This paper is concerned with the problem of gain-scheduled ℋ2 controller synthesis for continuous-time linear parameter-varying systems. In this problem, the system matrices in the state-space form are polytopic and patameterized and the admissible values of the parameters are assumed to be measurable on-line in a polytope space. By employing a basis-parameter-dependent Lyapunov function and introducing some slack variables to the well-established performance conditions, sufficient conditions for the existence of the desired gain-scheduled ℋ2 state feedback and dynamic output feedback controllers are established in terms of parameterized linear matrix inequalities. Based on the polytopic characteristic of the dependent parameters and a convexification method, the corresponding controller synthesis problem is then cast into finite-dimensional convex optimization problem which can be efficiently solved by using standard numerical softwares. Numerical examples are given to illustrate the effectiveness and advantage of the proposed methods.

  10. WGC Based Robust and Gain Scheduling PI Controller Design for Condensing Boilers

    Directory of Open Access Journals (Sweden)

    Cem Onat

    2014-05-01

    Full Text Available This paper addresses the water temperature PI control in condensing domestic boilers. The main challenge of this process under the controller design perspective is the fact that the dynamics of condensing boilers are strongly affected by the demanded water flow rate. First, a robust PI controller based on weighted geometrical center method is designed that stabilizes and achieves good performance for closed-loop system for a wide range of the water flow rate. Then, it is shown that if the water flow rate information is used to update the controller gains, through a technique known as gain scheduled control, the performance can be significantly improved. Important characteristics of these PI design approaches are that the resulting parameters are calculated numerically without using any graphical method or iterative optimization process and that it guarantees the stability of the closed-loop. Significantly, simulation results have demonstrated that the proposed tuning techniques can perform better for set point changes and load disturbance than other available methods in the literature.

  11. Effects of gain-scheduling methods in a classical wind turbine controller on wind turbine aeroservoelastic modes and loads

    DEFF Research Database (Denmark)

    Tibaldi, Carlo; Henriksen, Lars Christian; Hansen, Morten Hartvig

    2014-01-01

    The eects of dierent gain-scheduling methods for a classical wind turbine controller, operating in full load region, on the wind turbine aeroservoelastic modes and loads are investigated in this work. The dierent techniques are derived looking at the physical problem to take into account the chan......The eects of dierent gain-scheduling methods for a classical wind turbine controller, operating in full load region, on the wind turbine aeroservoelastic modes and loads are investigated in this work. The dierent techniques are derived looking at the physical problem to take into account...

  12. Desain Kontroler Fuzzy PID Gain Scheduling Untuk Pengaturan Kecepatan Motor DC Tanpa Sikat

    Directory of Open Access Journals (Sweden)

    Hudaibiy Hibban

    2015-12-01

    Full Text Available Motor DC, sebagai salah satu mesin listrik yang banyak digunakan di industri, penggunaannya banyak digantikan dengan Brushless DC Motor (BLDC. Penggunaan motor jenis ini hampir tidak menimbulkan polusi di jalan karena energi yang dipergunakan adalah energi listrik, sehingga selain kenyamanan karena nyaris tidak menimbulkan kebisingan motor ini juga ramah lingkungan. Di dalam tugas akhir ini, kita merancang sebuah sistem yang memberikan pembebanan pada motor BLDC menggunakan rem magnetik agar sistem menjadi tidak linear. Pada penelitian ini, digunakan kontroler Fuzzy PID Gain Scheduling untuk mengatur kecapatan motor BLDC. Dipilih kontroler PID karena pada kenyataannya kontrol yang paling sering dipakai adalah PID, dan Fuzzy digunakan sebagai pengatur nilai Kp, Ki, dan Kd. Setelah dilakukan implementasi pada kontroler didapatkan bahwa nilai rise time rata-rata respon motor sebesar 2,6 detik dan nilai settling time rata-rata sebesar 3,6 detik. Selain itu terdapat juga overshoot yang relatif kecil sekitar 1 persen. Hasil tugas akhir ini berupa motor BLDC dapat digunakan sebagai penelitian lebih lanjut untuk adik-adik kelas di jurusan Elektro maupun jurusan lain.

  13. Modeling and distributed gain scheduling strategy for load frequency control in smart grids with communication topology changes.

    Science.gov (United States)

    Liu, Shichao; Liu, Xiaoping P; El Saddik, Abdulmotaleb

    2014-03-01

    In this paper, we investigate the modeling and distributed control problems for the load frequency control (LFC) in a smart grid. In contrast with existing works, we consider more practical and real scenarios, where the communication topology of the smart grid changes because of either link failures or packet losses. These topology changes are modeled as a time-varying communication topology matrix. By using this matrix, a new closed-loop power system model is proposed to integrate the communication topology changes into the dynamics of a physical power system. The globally asymptotical stability of this closed-loop power system is analyzed. A distributed gain scheduling LFC strategy is proposed to compensate for the potential degradation of dynamic performance (mean square errors of state vectors) of the power system under communication topology changes. In comparison to conventional centralized control approaches, the proposed method can improve the robustness of the smart grid to the variation of the communication network as well as to reduce computation load. Simulation results show that the proposed distributed gain scheduling approach is capable to improve the robustness of the smart grid to communication topology changes. © 2013 ISA. Published by ISA. All rights reserved.

  14. Perancangan dan Implementasi Kontroler PID Gain Scheduling untuk Gerakan Lateral Way-to-Way Point pada UAV Quadcopter

    Directory of Open Access Journals (Sweden)

    Tri Awan Nusa Putra

    2013-09-01

    Full Text Available Quadcopter diharapkan dapat bergerak secara lincah dan efektif menyusuri lintasan horisontal. Berdasar hukum fisisnya, gerak lateral dapat terjadi karena adanya daya angkat dan terjadinya perubahan sudut dari quadcopter tersebut. Mengacu pada hal tersebut, sudut-sudut gerak pada quadcopterakan menjadi parameter untuk gerak maju atau menyamping yang secara langsung juga berpengaruh pada gerak vertikal. Pada saat proses hoveratau melayang, adalah saat yang paling riskan pada quadcopter. Sehinga pengaturan hover dari quadcopter menjadi prioritas pada riset ini, karena apabila terjadi kesalahan hoverakan menyebabkan perubahan gerak terhadap sumbu X, Y maupun Z. Pada tugas akhir ini digunakan kontroler PID dan metode gainscheduling dengan nilai parameter penguatan yang diperoleh secara eksperimental untuk pengaturan gerak lateral menyusuri lintasan. Apabila menggunakan metode PID biasa, maka diperoleh penurunan ketinggian yang drastis hingga 50% dari total ketinggian quadcopter, namun apabila menggunakan metode PID GainScheduling, pada simulasi hanya terjadi penurunan ketinggian sebesar 0,35% dan saat implementasi mengalami sekitar 10% dari total ketinggian yang dicapai.

  15. Power generation scheduling. A free market based procedure with reserve constraints included

    International Nuclear Information System (INIS)

    Huse, Einar Staale

    1998-01-01

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs

  16. Power generation scheduling. A free market based procedure with reserve constraints included

    Energy Technology Data Exchange (ETDEWEB)

    Huse, Einar Staale

    1998-12-31

    This thesis deals with the short-term scheduling of electric power generation in a competitive market. This involves determination of start-ups and shut-downs, and production levels of all units in all hours of the optimization period, considering unit characteristics and system restrictions. The unit characteristics and restrictions handled are minimum and maximum production levels, fuel cost function, start-up costs, minimum up time and minimum down time. The system restrictions handled are power balance (supply equals demand in all hours) and spinning reserve requirement. The thesis has two main contributions: (1) A new organization of an hourly electric power market that simultaneously sets the price of both energy and reserve power is proposed. A power exchange is used as a trading place for electricity. Its responsibility is to balance supply and demand bids and to secure enough spinning reserve. Routines for bidding and market clearing are developed. (2) A computer programme that simulates the proposed electricity market has been implemented. The program can also be used as a new method for solving the single owner generation scheduling problem. Simulations show that the performance of the program is excellent. Simulations also show that it is possible to obtain efficient schedules through the proposed electricity market. 37 refs., 20 figs., 15 tabs.

  17. Multiple time-scale optimization scheduling for islanded microgrids including PV, wind turbine, diesel generator and batteries

    DEFF Research Database (Denmark)

    Xiao, Zhao xia; Nan, Jiakai; Guerrero, Josep M.

    2017-01-01

    the adjustment of the day-ahead scheduling and giving priority to the use of renewable energy. According to the forecast of the critical and noncritical load, the wind speed, and the solar irradiation, mixed integer linear programming (MILP) optimization method is used to solve the multi-objective optimization......A multiple time-scale optimization scheduling including day ahead and short time for an islanded microgrid is presented. In this paper, the microgrid under study includes photovoltaics (PV), wind turbine (WT), diesel generator (DG), batteries, and shiftable loads. The study considers the maximum...... efficiency operation area for the diesel engine and the cost of the battery charge/discharge cycle losses. The day-ahead generation scheduling takes into account the minimum operational cost and the maximum load satisfaction as the objective function. Short-term optimal dispatch is based on minimizing...

  18. Radiation-included brachial plexus injury; Follow-up of two different fractionation schedules

    Energy Technology Data Exchange (ETDEWEB)

    Powell, S.; Cooke, J.; Parsons, C. (Royal Marsden Hospital, London (UK))

    1990-07-01

    All 449 breast cancer patients treated with post-operative radiotherapy to the breast and lymph nodes between 1982 and 1984 have been followed for 3-5.5 years. In this group two different fractionation schedules were used, one five times a fortnight and one daily, both over 6 weeks. The calculated dose to the brachial plexus was 45 Gy in 15 fractions or 5e Gy in 30 fractions. These schedules are equivalent doses using the standard NSD formula. The diagnosis of a brachial plexus injury was made clinically and computed tomography from recurrent disease. The actuarial incidence of a radiation-induced brachial plexus injury for the whole group was 4.9% at 5.5 years. No cases were seen in the first 10 months following radiotherapy. The incidence rises between 1 and 4 years and then starts to plateau. When the large fraction size group is compared with the small fraction size group the incidence at 5.5 years is 5.9% and 1.0%, respectively (p 0.09). Two different treatment techniques were used in this group but were not found to contribute to the probability of developing a brachial plexud injury. It is suggested that radiation using large doses per fraction are less well tolerated by the brachial plexus than small doses per fraction; a commonly used fractionation schedule such as 45 Gy in 15 fractions may give unacceptably high brachial plexus morbidity; and the of small doses per fraction or avoiding lymphatic irradiation is advocated. (author). 13 refs.; 6 figs.; 1 tab.

  19. Fuzzy-Logic-Based Gain-Scheduling Control for State-of-Charge Balance of Distributed Energy Storage Systems for DC Microgrids

    DEFF Research Database (Denmark)

    Aldana, Nelson Leonardo Diaz; Dragicevic, Tomislav; Vasquez, Juan Carlos

    2014-01-01

    -charge or deep-discharge in one of the energy storage units. Primary control in a microgrid is responsible for power sharing among units; and droop control is typically used in this stage. This paper proposes a modular and decentralized gain-scheduling control strategy based on fuzzy logic that ensures balanced...

  20. On the performance of two-way multiuser mixed RF/FSO relay networks with opportunistic scheduling & asymmetric channel gains

    KAUST Repository

    Al-Eryani, Yasser F.

    2017-07-20

    In this paper, the performance of two-way relaying (TWR) multiuser mixed radio frequency/free space optical (RF/FSO) relay networks with opportunistic user scheduling and asymmetric channel fading is studied. First, closed-form expressions for the exact outage probability, asymptotic (high signal-to-noise ration (SNR)) outage probability, and average ergodic channel capacity are derived assuming heterodyne detection (HD) scheme. Additionally, impacts of several system parameters including number of users, pointing errors, and atmospheric turbulence conditions on the overall network performance are investigated. All the theoretical results are validated by Monte-Carlo simulations. The results show that the TWR scheme almost doubles the network ergodic capacity compared to that of one-way relaying (OWR) scheme with the same outage performance. Additionally, the overall diversity order of the network is shown to be affected not only by the number of users, but it is also a function of the pointing error and atmospheric turbulence conditions.

  1. Comparing Pleasure and Pain: The Fundamental Mathematical Equivalence of Reward Gain and Shock Reduction under Variable Interval Schedules

    Science.gov (United States)

    Mallpress, Dave E. W.; Fawcett, Tim W.; McNamara, John M.; Houston, Alasdair I.

    2012-01-01

    The relationship between positive and negative reinforcement and the symmetry of Thorndike's law of effect are unresolved issues in operant psychology. Here we show that, for a given pattern of responding on variable interval (VI) schedules with the same programmed rate of food rewards (positive reinforcement VI) or electric shocks (negative…

  2. Vehicle dynamics control of four in-wheel motor drive electric vehicle using gain scheduling based on tyre cornering stiffness estimation

    Science.gov (United States)

    Xiong, Lu; Yu, Zhuoping; Wang, Yang; Yang, Chen; Meng, Yufeng

    2012-06-01

    This paper focuses on the vehicle dynamic control system for a four in-wheel motor drive electric vehicle, aiming at improving vehicle stability under critical driving conditions. The vehicle dynamics controller is composed of three modules, i.e. motion following control, control allocation and vehicle state estimation. Considering the strong nonlinearity of the tyres under critical driving conditions, the yaw motion of the vehicle is regulated by gain scheduling control based on the linear quadratic regulator theory. The feed-forward and feedback gains of the controller are updated in real-time by online estimation of the tyre cornering stiffness, so as to ensure the control robustness against environmental disturbances as well as parameter uncertainty. The control allocation module allocates the calculated generalised force requirements to each in-wheel motor based on quadratic programming theory while taking the tyre longitudinal/lateral force coupling characteristic into consideration. Simulations under a variety of driving conditions are carried out to verify the control algorithm. Simulation results indicate that the proposed vehicle stability controller can effectively stabilise the vehicle motion under critical driving conditions.

  3. A schedule of radiotherapy, including the use of the Cathetron for advanced carcinoma of the cervix. Chapter 3

    International Nuclear Information System (INIS)

    Ward, A.J.; Stubbs, B.; Dixon, B.; Firth, L.A.

    1980-01-01

    Since 1971, 78 patients with stage IIb and III carcinoma of the cervix have been treated in Leeds with the high-activity Cathetron afterloading device combined with external irradiation directed at the whole of the defined tumour volume. In four or more years of follow-up, no difference in the tumour response was found whether the external irradiation was given in an environment of air or hyperbaric oxygen. Although the results for all patients were satisfactory from the point of view of local control and survival, it was felt that an attempt should be made to devise a scheme which would reduce the level of morbidity, particularly in the bowel. Thus a modified treatment schedule has been adopted in the last two years in which the external irradiation component of the treatment is given by conventional fractionation and the volume treated is determined by lymphangiograms. (U.K.)

  4. Genetic gain and economic values of selection strategies including semen traits in three- and four-way crossbreeding systems for swine production.

    Science.gov (United States)

    González-Peña, D; Knox, R V; MacNeil, M D; Rodriguez-Zas, S L

    2015-03-01

    Four semen traits: volume (VOL), concentration (CON), progressive motility of spermatozoa (MOT), and abnormal spermatozoa (ABN) provide complementary information on boar fertility. Assessment of the impact of selection for semen traits is hindered by limited information on economic parameters. Objectives of this study were to estimate economic values for semen traits and to evaluate the genetic gain when these traits are incorporated into traditional selection strategies in a 3-tier system of swine production. Three-way (maternal nucleus lines A and B and paternal nucleus line C) and 4-way (additional paternal nucleus line D) crossbreeding schemes were compared. A novel population structure that accommodated selection for semen traits was developed. Three selection strategies were simulated. Selection Strategy I (baseline) encompassed selection for maternal traits: number of pigs born alive (NBA), litter birth weight (LBW), adjusted 21-d litter weight (A21), and number of pigs at 21 d (N21); and paternal traits: number of days to 113.5 kg (D113), backfat (BF), ADG, feed efficiency (FE), and carcass lean % (LEAN). Selection Strategy II included Strategy I and the number of usable semen doses per collection (DOSES), a function of the 4 semen traits. Selection Strategy III included Strategy I and the 4 semen traits individually. The estimated economic values of VOL, CON, MOT, ABN, and DOSES for 7 to 1 collections/wk ranged from $0.21 to $1.44/mL, $0.12 to $0.83/10 spermatozoa/mm, $0.61 to $12.66/%, -$0.53 to -$10.88/%, and $2.01 to $41.43/%, respectively. The decrease in the relative economic values of semen traits and DOSES with higher number of collections per wk was sharper between 1 and 2.33 collections/wk than between 2.33 and 7 collections/wk. The higher economic value of MOT and ABN relative to VOL and CON could be linked to the genetic variances and covariances of these traits. Average genetic gains for the maternal traits were comparable across strategies

  5. 75 FR 42831 - Proposed Collection; Comment Request for Form 1065, Schedule C, Schedule D, Schedule K-1...

    Science.gov (United States)

    2010-07-22

    .... Return of Partnership Income), Schedule D (Capital Gains and Losses), Schedule K-1 (Partner's Share of...' Capital Accounts), and Schedule M-3 (Net Income (Loss) Reconciliation for Certain Partnerships)). DATES... Partnership Income (Form 1065), Capital Gains and Losses (Schedule D), Partner's Share of Income, Credits...

  6. Program reference schedule baseline

    International Nuclear Information System (INIS)

    1986-07-01

    This Program Reference Schedule Baseline (PRSB) provides the baseline Program-level milestones and associated schedules for the Civilian Radioactive Waste Management Program. It integrates all Program-level schedule-related activities. This schedule baseline will be used by the Director, Office of Civilian Radioactive Waste Management (OCRWM), and his staff to monitor compliance with Program objectives. Chapter 1 includes brief discussions concerning the relationship of the PRSB to the Program Reference Cost Baseline (PRCB), the Mission Plan, the Project Decision Schedule, the Total System Life Cycle Cost report, the Program Management Information System report, the Program Milestone Review, annual budget preparation, and system element plans. Chapter 2 includes the identification of all Level 0, or Program-level, milestones, while Chapter 3 presents and discusses the critical path schedules that correspond to those Level 0 milestones

  7. 17 CFR 240.13d-101 - Schedule 13D-Information to be included in statements filed pursuant to § 240.13d-1(a) and...

    Science.gov (United States)

    2010-04-01

    ... securities. Item 2. Identity and Background. If the person filing this statement or any person enumerated in... disposition of securities of the issuer; (b) An extraordinary corporate transaction, such as a merger... corporate structure, including but not limited to, if the issuer is a registered closed-end investment...

  8. 17 CFR 240.15g-100 - Schedule 15G-Information to be included in the document distributed pursuant to 17 CFR 240.15g-2.

    Science.gov (United States)

    2010-04-01

    ... of investing in penny stocks. Please read it carefully before you agree to purchase or sell a penny... to accurately price. Investors in penny stock should be prepared for the possibility that they may... securities—including penny stocks—is available on the SEC's Web site at http://www.sec.gov/investor/pubs...

  9. Experience in scheduled maintenance

    International Nuclear Information System (INIS)

    Tsai, M.T.

    1985-01-01

    As outage management affects both the cost and reliability of a nuclear power plant, performance of a scheduled maintenance outage in an efficient and effective manner is an important task in the operation of nuclear power plant. This paper covers the experience gained in the past ten refueling outages for the two BWR units at the First Nuclear Power Station of Taipower. The key to optimizing both the cost and schedule of a refueling outage is to maintain a high level of quality workmanship. The outage management in planning, scheduling, preparation, coordination, and cooperation, accompanied by the qualified in-house capability and sufficient outside support, have placed the refueling outages at the FNPS in a well controlled situation and have established the capacity factors of these two BWR units at a level which is 20% higher than the world average in the past years

  10. CERN confirms LHC schedule

    CERN Multimedia

    2003-01-01

    The CERN Council held its 125th session on 20 June. Highlights of the meeting included confirmation that the LHC is on schedule for a 2007 start-up, and the announcement of a new organizational structure in 2004.

  11. Block Scheduling in High Schools.

    Science.gov (United States)

    Irmsher, Karen

    1996-01-01

    Block Scheduling has been considered a cure for a lengthy list of educational problems. This report reviews the literature on block schedules and describes some Oregon high schools that have integrated block scheduling. Major disadvantages included resistance to change and requirements that teachers change their teaching strategies. There is…

  12. Location-based Scheduling

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    the predominant scheduling method since it was introduced in the late 1950s. Over the years, CPM has proven to be a very powerful technique for planning, scheduling and controlling projects, which among other things is indicated by the development of a large number of CPM-based software applications available...... on the market. However, CPM is primarily an activity based method that takes the activity as the unit of focus and there is criticism raised, specifically in the case of construction projects, on the method for deficient management of construction work and continuous flow of resources. To seek solutions...... to the identified limitations of the CPM method, an alternative planning and scheduling methodology that includes locations is tested. Location-based Scheduling (LBS) implies a shift in focus, from primarily the activities to the flow of work through the various locations of the project, i.e. the building. LBS uses...

  13. CMS multicore scheduling strategy

    International Nuclear Information System (INIS)

    Yzquierdo, Antonio Pérez-Calero; Hernández, Jose; Holzman, Burt; Majewski, Krista; McCrea, Alison

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue 'Moore's Law' style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications, but also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multicore jobs on the GRID based on the glideinWMS submission infrastructure. The main component of the scheduling strategy, a pilot-based model with dynamic partitioning of resources that allows the transition to multicore or whole-node scheduling without disallowing the use of single-core jobs, is described. This contribution also presents the experiences made with the proposed multicore scheduling schema and gives an outlook of further developments working towards the restart of the LHC in 2015.

  14. Schedule Analytics

    Science.gov (United States)

    2016-04-30

    led several cost research initiatives in cloud computing, service-oriented architecture, and agile development and various independent schedule...and he supports DoD and federal acquisition efforts with a focus on rapid and agile practices to speed solutions with the lowest practical program...assessment, and risk management to control cost and deliver on time. A Government Accountability Office (GAO) assessment of 86 programs that made up the

  15. Scheduling theory, algorithms, and systems

    CERN Document Server

    Pinedo, Michael L

    2016-01-01

    This new edition of the well-established text Scheduling: Theory, Algorithms, and Systems provides an up-to-date coverage of important theoretical models in the scheduling literature as well as important scheduling problems that appear in the real world. The accompanying website includes supplementary material in the form of slide-shows from industry as well as movies that show actual implementations of scheduling systems. The main structure of the book, as per previous editions, consists of three parts. The first part focuses on deterministic scheduling and the related combinatorial problems. The second part covers probabilistic scheduling models; in this part it is assumed that processing times and other problem data are random and not known in advance. The third part deals with scheduling in practice; it covers heuristics that are popular with practitioners and discusses system design and implementation issues. All three parts of this new edition have been revamped, streamlined, and extended. The reference...

  16. Performance analysis of a large-grain dataflow scheduling paradigm

    Science.gov (United States)

    Young, Steven D.; Wills, Robert W.

    1993-01-01

    A paradigm for scheduling computations on a network of multiprocessors using large-grain data flow scheduling at run time is described and analyzed. The computations to be scheduled must follow a static flow graph, while the schedule itself will be dynamic (i.e., determined at run time). Many applications characterized by static flow exist, and they include real-time control and digital signal processing. With the advent of computer-aided software engineering (CASE) tools for capturing software designs in dataflow-like structures, macro-dataflow scheduling becomes increasingly attractive, if not necessary. For parallel implementations, using the macro-dataflow method allows the scheduling to be insulated from the application designer and enables the maximum utilization of available resources. Further, by allowing multitasking, processor utilizations can approach 100 percent while they maintain maximum speedup. Extensive simulation studies are performed on 4-, 8-, and 16-processor architectures that reflect the effects of communication delays, scheduling delays, algorithm class, and multitasking on performance and speedup gains.

  17. Construct validity and parent-child agreement of the six new or modified disorders included in the Spanish version of the Kiddie Schedule for Affective Disorders and Schizophrenia present and Lifetime Version DSM-5 (K-SADS-PL-5).

    Science.gov (United States)

    de la Peña, Francisco R; Rosetti, Marcos F; Rodríguez-Delgado, Andrés; Villavicencio, Lino R; Palacio, Juan D; Montiel, Cecilia; Mayer, Pablo A; Félix, Fernando J; Larraguibel, Marcela; Viola, Laura; Ortiz, Silvia; Fernández, Sofía; Jaímes, Aurora; Feria, Miriam; Sosa, Liz; Palacios-Cruz, Lino; Ulloa, Rosa E

    2018-06-01

    Changes to the Diagnostic and Statistical Manual of Mental Disorders fifth edition (DSM-5) incorporate the inclusion or modification of six disorders: Autism Spectrum Disorder, Social Anxiety Disorder, Intermittent Explosive Disorder, Disruptive Mood Dysregulation Disorder, Avoidant/Restrictive Food Intake Disorder and Binge Eating Disorder. The objectives of this study were to assess the construct validity and parent-child agreement of these six disorders in the Spanish language Schedule for Affective Disorders and Schizophrenia for School Age Children Present and Lifetime Version (K-SADS-PL-5) in a clinical population of children and adolescents from Latin America. The Spanish version of the K-SADS-PL was modified to integrate changes made to the DSM-5. Clinicians received training in the K-SADS-PL-5 and 90% agreement between raters was obtained. A total of 80 patients were recruited in four different countries in Latin America. All items from each of the six disorders were included in a factor analysis. Parent-child agreement was calculated for every item of the six disorders, including the effect of sex and age. The factor analysis revealed 6 factors separately grouping the items defining each of the new or modified disorders, with Eigenvalues greater than 2. Very good parent-child agreements (r>0.8) were found for the large majority of the items (93%), even when considering the sex or age of the patient. This independent grouping of disorders suggests that the manner in which the disorders were included into the K-SADS-PL-5 reflects robustly the DSM-5 constructs and displayed a significant inter-informant reliability. These findings support the use of K-SADS-PL-5 as a clinical and research tool to evaluate these new or modified diagnoses. Copyright © 2018. Published by Elsevier Ltd.

  18. Joint Scheduling for Dual-Hop Block-Fading Broadcast Channels

    KAUST Repository

    Zafar, Ammar

    2012-09-16

    In this paper, we propose joint user-and-hop scheduling over dual-hop block-fading broadcast channels in order to exploit multi-user diversity gains and multi-hop diversity gains all together. To achieve this objective, the first and second hops are scheduled opportunistically based on the channel state information and as a prerequisite we assume that the relay, which is half-duplex and operates using decode-and-forward, is capable of storing the received packets from the source until the channel condition of the destined user becomes good to be scheduled. We formulate the joint scheduling problem as maximizing the weighted sum of the long term achievable rates by the users under a stability constraint, which means that on the long term the rate received by the relay should equal the rate transmitted by it, in addition to constant or variable power constraints. We show that this problem is equivalent to a single-hop broadcast channel by treating the source as a virtual user with an optimal priority weight that maintains the stability constraint. We show how to obtain the source weight either off-line based on channel statistics or on real-time based on channel measurements. Furthermore, we consider special cases including the maximum sum rate scheduler and the proportional fair scheduler. We demonstrate via numerical results that our proposed joint scheduling scheme enlarges the rate region as compared with a scheme that employs multi-user scheduling alone.

  19. CMS Multicore Scheduling Strategy

    CERN Document Server

    Perez-Calero Yzquierdo, Antonio

    2014-01-01

    In the next years, processor architectures based on much larger numbers of cores will be most likely the model to continue Moores Law style throughput gains. This not only results in many more jobs in parallel running the LHC Run 1 era monolithic applications. Also the memory requirements of these processes push the workernode architectures to the limit. One solution is parallelizing the application itself, through forking and memory sharing or through threaded frameworks. CMS is following all of these approaches and has a comprehensive strategy to schedule multi-core jobs on the GRID based on the glideIn WMS submission infrastructure. We will present the individual components of the strategy, from special site specific queues used during provisioning of resources and implications to scheduling; to dynamic partitioning within a single pilot to allow to transition to multi-core or whole-node scheduling on site level without disallowing single-core jobs. In this presentation, we will present the experiences mad...

  20. An extended Intelligent Water Drops algorithm for workflow scheduling in cloud computing environment

    Directory of Open Access Journals (Sweden)

    Shaymaa Elsherbiny

    2018-03-01

    Full Text Available Cloud computing is emerging as a high performance computing environment with a large scale, heterogeneous collection of autonomous systems and flexible computational architecture. Many resource management methods may enhance the efficiency of the whole cloud computing system. The key part of cloud computing resource management is resource scheduling. Optimized scheduling of tasks on the cloud virtual machines is an NP-hard problem and many algorithms have been presented to solve it. The variations among these schedulers are due to the fact that the scheduling strategies of the schedulers are adapted to the changing environment and the types of tasks. The focus of this paper is on workflows scheduling in cloud computing, which is gaining a lot of attention recently because workflows have emerged as a paradigm to represent complex computing problems. We proposed a novel algorithm extending the natural-based Intelligent Water Drops (IWD algorithm that optimizes the scheduling of workflows on the cloud. The proposed algorithm is implemented and embedded within the workflows simulation toolkit and tested in different simulated cloud environments with different cost models. Our algorithm showed noticeable enhancements over the classical workflow scheduling algorithms. We made a comparison between the proposed IWD-based algorithm with other well-known scheduling algorithms, including MIN-MIN, MAX-MIN, Round Robin, FCFS, and MCT, PSO and C-PSO, where the proposed algorithm presented noticeable enhancements in the performance and cost in most situations.

  1. Planning and Scheduling of Airline Operations

    Directory of Open Access Journals (Sweden)

    İlkay ORHAN

    2010-02-01

    Full Text Available The Turkish Civil Aviation sector has grown at a rate of 53 % between the years 2002-2008 owing to countrywide economical developments and some removed restrictions in the aviation field. Successful international companies in the sector use advanced computer-supported solution methods for their planning and scheduling problems. These methods have been providing significant competitive advantages to those companies. There are four major scheduling and planning problems in the airline sector: flight scheduling, aircraft scheduling, crew scheduling and disruptions management. These aforementioned scheduling and planning problems faced by all airline companies in the airline sector were examined in detail. Studies reveal that companies using the advanced methods might gain significant cost reductions. However, even then, the time required for solving large scale problems may not satisfy the decision quality desired by decision makers. In such cases, using modern decision methods integrated with advanced technologies offer companies an opportunity for significant cost-advantages.

  2. Records Control Schedules Repository

    Data.gov (United States)

    National Archives and Records Administration — The Records Control Schedules (RCS) repository provides access to scanned versions of records schedules, or Standard Form 115, Request for Records Disposition...

  3. Vehicle and driver scheduling for public transit.

    Science.gov (United States)

    2009-08-01

    The problem of driver scheduling involves the construction of a legal set of shifts, including allowance : of overtime, which cover the blocks in a particular vehicle schedule. A shift is the work scheduled to be performed by : a driver in one day, w...

  4. Multiuser switched diversity scheduling schemes

    KAUST Repository

    Shaqfeh, Mohammad

    2012-09-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed, and ordered scheduling mechanism. The main idea behind these schemes is that slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we characterize the achievable rate region of multiuser switched diversity systems and compare it with the rate region of full feedback multiuser diversity systems. We propose also a novel proportional fair multiuser switched-based scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the feedback thresholds. We finally demonstrate by numerical examples that switched-diversity scheduling schemes operate within 0.3 bits/sec/Hz from the ultimate network capacity of full feedback systems in Rayleigh fading conditions. © 2012 IEEE.

  5. Intelligent control of diesel generators using gain-scheduling

    DEFF Research Database (Denmark)

    Mai, Christian; Jepsen, Kasper; Yang, Zhenyu

    2014-01-01

    The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic reco...... a controlled AC-motor is employed to emulate a diesel engine. The testing results clearly show that the proposed control solution can lead to a better overall system performance than most existing solutions do, especially subject to widely diverse operating conditions......The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic...... recognition procedure when it is plugged into a specific diesel generator, such that some extensive manual-tuning of the installed controller can be significantly reduced; (ii) The proposed control has an real-time adaptability by using the online external load estimation, such that the integrated system can...

  6. Decentralized controller gain scheduling using PSO for power ...

    African Journals Online (AJOL)

    For this reason, in this study the P and I control parameters are tuned based on Particle Swarm Optimization (PSO) algorithm for a better Load-Frequency Control in a Two-Area Two-Unit Thermal Reheat Power System (TATURIPS) with step load perturbation. To exemplify the optimum parameter search PSO is used as it is ...

  7. Decentralized controller gain scheduling using PSO for power ...

    African Journals Online (AJOL)

    user

    It gives approximately two-thirds of the total power output of a typical combined cycle plant (S. Barsali, et al 2008, M. Nagpal, et al,. 2001). When the load is suddenly increased the speed drops quickly, but the regulator reacts and increases the fuel flow to a maximum of 100% thereby improving the efficiency of the system.

  8. Generalized gain scheduling for deloaded wind turbine operation

    DEFF Research Database (Denmark)

    Venne, Philippe; Guillaud, X.; Teodorescu, Remus

    2010-01-01

    The ability to produce less power than what is available from a wind source, a condition known as deloaded operation, is needed for a wind turbine to reproduce synchronous machine behavior in terms of inertial response and frequency droop regulation. Deloaded operation requires the ability...

  9. Widening the Schedulability Hierarchical Scheduling Systems

    DEFF Research Database (Denmark)

    Boudjadar, Jalil; David, Alexandre; Kim, Jin Hyun

    2014-01-01

    This paper presents a compositional approach for schedula- bility analysis of hierarchical systems, which enables to prove more sys- tems schedulable by having richer and more detailed scheduling models. We use a lightweight method (statistical model checking) for design ex- ploration, easily ass...

  10. Learn and gain

    CERN Document Server

    Al-Alami, Suhair Eyad Jamal

    2013-01-01

    Initiating the slogan ""love it, live it"", Learn and Gain includes eight short stories, chosen to illustrate various modes of narration, as well as to provoke reflection and discussion on a range of issues. All texts utilized here illustrate how great writers can, with their insight and gift for words, help us to see the world we live in, in new probing and exciting ways. What characterises the book, the author believes, is the integration of the skills of literary competence, communicative c...

  11. Immunization Schedules for Adults

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Adults (19 Years of Age and ... diseases that can be prevented by vaccines . 2018 Immunization Schedule Recommended Vaccinations for Adults by Age and ...

  12. Instant Childhood Immunization Schedule

    Science.gov (United States)

    ... Recommendations Why Immunize? Vaccines: The Basics Instant Childhood Immunization Schedule Recommend on Facebook Tweet Share Compartir Get ... date. See Disclaimer for additional details. Based on Immunization Schedule for Children 0 through 6 Years of ...

  13. Overlapping 16p13.11 Deletion and Gain of Copies Variations Associated with Childhood Onset Psychosis Include Genes with Mechanistic Implications for Autism Associated Pathways: Two Case Reports

    Science.gov (United States)

    Brownstein, Catherine A.; Kleiman, Robin J.; Engle, Elizabeth C.; Towne, Meghan C.; D’Angelo, Eugene J.; Yu, Timothy W.; Beggs, Alan H.; Picker, Jonathan; Fogler, Jason M.; Carroll, Devon; Schmitt, Rachel C. O.; Wolff, Robert R.; Shen, Yiping; Lip, Va; Bilguvar, Kaya; Kim, April; Tembulkar, Sahil; O’Donnell, Kyle; Gonzalez-Heydrich, Joseph

    2016-01-01

    Copy number variability at 16p13.11 has been associated with intellectual disability, autism, schizophrenia, epilepsy and attention-deficit hyperactivity disorder. Adolescent/adult- onset psychosis has been reported in a subset of these cases. Here, we report on two children with CNVs in 16p13.11 that developed psychosis before the age of 7. The genotype and neuropsychiatric abnormalities of these patients highlight several overlapping genes that have possible mechanistic relevance to pathways previously implicated in Autism Spectrum Disorders, including the mTOR signaling and the ubiquitin-proteasome cascades. A careful screening of the 16p13.11 region is warranted in patients with childhood onset psychosis. PMID:26887912

  14. NASA scheduling technologies

    Science.gov (United States)

    Adair, Jerry R.

    1994-01-01

    This paper is a consolidated report on ten major planning and scheduling systems that have been developed by the National Aeronautics and Space Administration (NASA). A description of each system, its components, and how it could be potentially used in private industry is provided in this paper. The planning and scheduling technology represented by the systems ranges from activity based scheduling employing artificial intelligence (AI) techniques to constraint based, iterative repair scheduling. The space related application domains in which the systems have been deployed vary from Space Shuttle monitoring during launch countdown to long term Hubble Space Telescope (HST) scheduling. This paper also describes any correlation that may exist between the work done on different planning and scheduling systems. Finally, this paper documents the lessons learned from the work and research performed in planning and scheduling technology and describes the areas where future work will be conducted.

  15. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-01-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes cost and schedule data through June 1989

  16. Optimization of time–temperature schedule for nitridation of silicon ...

    Indian Academy of Sciences (India)

    weight gain. Green compact of density 66%, the nitridation schedule was maneuvered for complete nitridation. Iron promotes nitridation reaction. Higher weight loss during nitridation of iron doped compact is the main cause of lower ...

  17. Performance Evaluation of Proportional Fair Scheduling Algorithm with Measured Channels

    DEFF Research Database (Denmark)

    Sørensen, Troels Bundgaard; Pons, Manuel Rubio

    2005-01-01

    Motivated by the promising performance results of the proportional fair (PF) packet scheduling algorithm, often quoted in connection with WCDMA High Speed Downlink Packet Access (HSDPA), we have performed an evaluation of the PF gain in comparison to the simpler round robin (RR) scheduler when...

  18. Scheduling for decommissioning projects

    International Nuclear Information System (INIS)

    Podmajersky, O.E.

    1987-01-01

    This paper describes the Project Scheduling system being employed by the Decommissioning Operations Contractor at the Shippingport Station Decommissioning Project (SSDP). Results from the planning system show that the project continues to achieve its cost and schedule goals. An integrated cost and schedule control system (C/SCS) which uses the concept of earned value for measurement of performance was instituted in accordance with DOE orders. The schedule and cost variances generated by the C/SCS system are used to confirm management's assessment of project status. This paper describes the types of schedules and tools used on the SSDP project to plan and monitor the work, and identifies factors that are unique to a decommissioning project that make scheduling critical to the achievement of the project's goals. 1 fig

  19. Analysis of Issues for Project Scheduling by Multiple, Dispersed Schedulers (distributed Scheduling) and Requirements for Manual Protocols and Computer-based Support

    Science.gov (United States)

    Richards, Stephen F.

    1991-01-01

    Although computerized operations have significant gains realized in many areas, one area, scheduling, has enjoyed few benefits from automation. The traditional methods of industrial engineering and operations research have not proven robust enough to handle the complexities associated with the scheduling of realistic problems. To address this need, NASA has developed the computer-aided scheduling system (COMPASS), a sophisticated, interactive scheduling tool that is in wide-spread use within NASA and the contractor community. Therefore, COMPASS provides no explicit support for the large class of problems in which several people, perhaps at various locations, build separate schedules that share a common pool of resources. This research examines the issue of distributing scheduling, as applied to application domains characterized by the partial ordering of tasks, limited resources, and time restrictions. The focus of this research is on identifying issues related to distributed scheduling, locating applicable problem domains within NASA, and suggesting areas for ongoing research. The issues that this research identifies are goals, rescheduling requirements, database support, the need for communication and coordination among individual schedulers, the potential for expert system support for scheduling, and the possibility of integrating artificially intelligent schedulers into a network of human schedulers.

  20. Antidepressants and Weight Gain

    Science.gov (United States)

    Antidepressants and weight gain: What causes it? Can antidepressants cause weight gain? Answers from Daniel K. Hall- ... is a possible side effect of nearly all antidepressants. However, each person responds to antidepressants differently. Some ...

  1. A question of matching rather than scheduling

    NARCIS (Netherlands)

    van de Velde, S.L.

    1995-01-01

    Proper scheduling maintenance for Air Force C-130 aircraft involves the prevention of mismatches concerning the availability of the aircraft and a new wing kit which would prolong its use. Scheduling maintenance problems include the designation of wing kits in the production sequence to match for a

  2. The triangle scheduling problem

    NARCIS (Netherlands)

    Dürr, Christoph; Hanzálek, Zdeněk; Konrad, Christian; Seddik, Yasmina; Sitters, R.A.; Vásquez, Óscar C.; Woeginger, Gerhard

    2017-01-01

    This paper introduces a novel scheduling problem, where jobs occupy a triangular shape on the time line. This problem is motivated by scheduling jobs with different criticality levels. A measure is introduced, namely the binary tree ratio. It is shown that the Greedy algorithm solves the problem to

  3. Automated scheduling and planning from theory to practice

    CERN Document Server

    Ozcan, Ender; Urquhart, Neil

    2013-01-01

      Solving scheduling problems has long presented a challenge for computer scientists and operations researchers. The field continues to expand as researchers and practitioners examine ever more challenging problems and develop automated methods capable of solving them. This book provides 11 case studies in automated scheduling, submitted by leading researchers from across the world. Each case study examines a challenging real-world problem by analysing the problem in detail before investigating how the problem may be solved using state of the art techniques.The areas covered include aircraft scheduling, microprocessor instruction scheduling, sports fixture scheduling, exam scheduling, personnel scheduling and production scheduling.  Problem solving methodologies covered include exact as well as (meta)heuristic approaches, such as local search techniques, linear programming, genetic algorithms and ant colony optimisation.The field of automated scheduling has the potential to impact many aspects of our lives...

  4. Joint opportunistic scheduling and network coding for bidirectional relay channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-07-01

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users\\' transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited. © 2013 IEEE.

  5. Effects of Block Scheduling

    Directory of Open Access Journals (Sweden)

    William R. Veal

    1999-09-01

    Full Text Available This study examined the effects of a tri-schedule on the academic achievement of students in a high school. The tri-schedule consists of traditional, 4x4 block, and hybrid schedules running at the same time in the same high school. Effectiveness of the schedules was determined from the state mandated test of basic skills in reading, language, and mathematics. Students who were in a particular schedule their freshman year were tested at the beginning of their sophomore year. A statistical ANCOVA test was performed using the schedule types as independent variables and cognitive skill index and GPA as covariates. For reading and language, there was no statistically significant difference in test results. There was a statistical difference mathematics-computation. Block mathematics is an ideal format for obtaining more credits in mathematics, but the block format does little for mathematics achievement and conceptual understanding. The results have content specific implications for schools, administrations, and school boards who are considering block scheduling adoption.

  6. Physician Fee Schedule Search

    Data.gov (United States)

    U.S. Department of Health & Human Services — This website is designed to provide information on services covered by the Medicare Physician Fee Schedule (MPFS). It provides more than 10,000 physician services,...

  7. Project Schedule Simulation

    DEFF Research Database (Denmark)

    Mizouni, Rabeb; Lazarova-Molnar, Sanja

    2015-01-01

    Despite several attempts to accurately predict duration and cost of software projects, initial plans still do not reflect real-life situations. Since commitments with customers are usually decided based on these initial plans, software companies frequently fail to deliver on time and many projects...... overrun both their budget and time. To improve the quality of initial project plans, we show in this paper the importance of (1) reflecting features’ priorities/risk in task schedules and (2) considering uncertainties related to human factors in plan schedules. To make simulation tasks reflect features......’ priority as well as multimodal team allocation, enhanced project schedules (EPS), where remedial actions scenarios (RAS) are added, were introduced. They reflect potential schedule modifications in case of uncertainties and promote a dynamic sequencing of involved tasks rather than the static conventional...

  8. CMS Records Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The CMS Records Schedule provides disposition authorizations approved by the National Archives and Records Administration (NARA) for CMS program-related records...

  9. DMEPOS Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — The list contains the fee schedule amounts, floors, and ceilings for all procedure codes and payment category, jurisdication, and short description assigned to each...

  10. Childhood Vaccine Schedule

    Science.gov (United States)

    ... Navigation Bar Home Current Issue Past Issues Childhood Vaccine Schedule Past Issues / Spring 2008 Table of Contents ... please turn Javascript on. When to Vaccinate What Vaccine Why Birth (or any age if not previously ...

  11. Fee Schedules - General Information

    Data.gov (United States)

    U.S. Department of Health & Human Services — A fee schedule is a complete listing of fees used by Medicare to pay doctors or other providers-suppliers. This comprehensive listing of fee maximums is used to...

  12. Clinical Laboratory Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Outpatient clinical laboratory services are paid based on a fee schedule in accordance with Section 1833(h) of the Social Security Act. The clinical laboratory fee...

  13. Decentralized Ground Staff Scheduling

    DEFF Research Database (Denmark)

    Sørensen, M. D.; Clausen, Jens

    2002-01-01

    Typically, ground staff scheduling is centrally planned for each terminal in an airport. The advantage of this is that the staff is efficiently utilized, but a disadvantage is that staff spends considerable time walking between stands. In this paper a decentralized approach for ground staff...... scheduling is investigated. The airport terminal is divided into zones, where each zone consists of a set of stands geographically next to each other. Staff is assigned to work in only one zone and the staff scheduling is planned decentralized for each zone. The advantage of this approach is that the staff...... work in a smaller area of the terminal and thus spends less time walking between stands. When planning decentralized the allocation of stands to flights influences the staff scheduling since the workload in a zone depends on which flights are allocated to stands in the zone. Hence solving the problem...

  14. Economic and psychological burden of scheduled surgery ...

    African Journals Online (AJOL)

    Background: Cancellation of scheduled surgery creates a financial burden for hospitals, caregivers and patients. Cancellation ... management. High cancellation rates may indicate that rare health resources are being used ineffectively, thereby increasing costs. There are many reasons for surgery cancellation including.

  15. A reduced feedback proportional fair multiuser scheduling scheme

    KAUST Repository

    Shaqfeh, Mohammad

    2011-12-01

    Multiuser switched-diversity scheduling schemes were recently proposed in order to overcome the heavy feedback requirements of conventional opportunistic scheduling schemes by applying a threshold-based, distributed and ordered scheduling mechanism. A slight reduction in the prospected multiuser diversity gains is an acceptable trade-off for great savings in terms of required channel-state-information feedback messages. In this work, we propose a novel proportional fair multiuser switched-diversity scheduling scheme and we demonstrate that it can be optimized using a practical and distributed method to obtain the per-user feedback thresholds. We demonstrate by numerical examples that our reduced feedback proportional fair scheduler operates within 0.3 bits/sec/Hz from the achievable rates by the conventional full feedback proportional fair scheduler in Rayleigh fading conditions. © 2011 IEEE.

  16. On Multiple Users Scheduling Using Superposition Coding over Rayleigh Fading Channels

    KAUST Repository

    Zafar, Ammar

    2013-02-20

    In this letter, numerical results are provided to analyze the gains of multiple users scheduling via superposition coding with successive interference cancellation in comparison with the conventional single user scheduling in Rayleigh blockfading broadcast channels. The information-theoretic optimal power, rate and decoding order allocation for the superposition coding scheme are considered and the corresponding histogram for the optimal number of scheduled users is evaluated. Results show that at optimality there is a high probability that only two or three users are scheduled per channel transmission block. Numerical results for the gains of multiple users scheduling in terms of the long term throughput under hard and proportional fairness as well as for fixed merit weights for the users are also provided. These results show that the performance gain of multiple users scheduling over single user scheduling increases when the total number of users in the network increases, and it can exceed 10% for high number of users

  17. ATLAS construction schedule

    CERN Multimedia

    Kotamaki, M

    The goal during the last few months has been to freeze and baseline as much as possible the schedules of various ATLAS systems and activities. The main motivations for the re-baselining of the schedules have been the new LHC schedule aiming at first collisions in early 2006 and the encountered delays in civil engineering as well as in the production of some of the detectors. The process was started by first preparing a new installation schedule that takes into account all the new external constraints and the new ATLAS staging scenario. The installation schedule version 3 was approved in the March EB and it provides the Ready For Installation (RFI) milestones for each system, i.e. the date when the system should be available for the start of the installation. TCn is now interacting with the systems aiming at a more realistic and resource loaded version 4 before the end of the year. Using the new RFI milestones as driving dates a new summary schedule has been prepared, or is under preparation, for each system....

  18. Time and Learning: Scheduling for Success. Hot Topics Series.

    Science.gov (United States)

    Kennedy, Robert L., Ed.; Witcher, Ann E., Ed.

    This book provides information for educators considering ways to make the best use of time available for learning. Twenty-one articles are divided into 5 chapters. Chapter 1: "How Can We Make the Most of the School Day?" includes an overview and 6 articles: (1) "Block Scheduling" (Karen Irmsher); (2)"The Hybrid Schedule: Scheduling to the…

  19. User interface issues in supporting human-computer integrated scheduling

    Science.gov (United States)

    Cooper, Lynne P.; Biefeld, Eric W.

    1991-01-01

    The topics are presented in view graph form and include the following: characteristics of Operations Mission Planner (OMP) schedule domain; OMP architecture; definition of a schedule; user interface dimensions; functional distribution; types of users; interpreting user interaction; dynamic overlays; reactive scheduling; and transitioning the interface.

  20. Planning and scheduling - A schedule's performance

    International Nuclear Information System (INIS)

    Whitman, N.M.

    1993-01-01

    Planning and scheduling is a process whose time has come to PSI Energy. With an awareness of the challenges ahead, individuals must look for ways to enhance the corporate competitiveness. Working toward this goal means that each individual has to dedicate themselves to this more competitive corporate environment. Being competitive may be defined as the ability of each employee to add value to the corporation's economic well being. The timely and successful implementation of projects greatly enhances competitiveness. Those projects that do not do well often suffer from lack of proper execution - not for lack of talent or strategic vision. Projects are consumers of resources such as cash and people. They produce a return when completed and will generate a better return when properly completed utilizing proven project management techniques. Completing projects on time, within budget and meeting customer expectations is the way a corporation builds it's future. This paper offers suggestions on implementing planning and scheduling and provides a review of results in the form of management reports

  1. Routine environmental monitoring schedule, calendar year 1997

    Energy Technology Data Exchange (ETDEWEB)

    Markes, B.M., Westinghouse Hanford

    1996-12-10

    This document provides the Environmental Restorations Contractor (ERC) and the Project Hanford Management Contractor.(PHMC) a schedule in accordance with the WHC-CM-7-5, Environmental Compliance` and BHI- EE-02, Environmental Requirements, of monitoring and sampling routines for the Near-Field Monitoring (NFM) program during calendar year (CY) 1997. Every attempt will be made to consistently follow this schedule; any deviation from this schedule will be documented by an internal memorandum (DSI) explaining the reason for the deviation. The DSI will be issued by the scheduled performing organization and directed to Near-Field Monitoring. The survey frequencies for particular sites are determined by the technical judgment of Near- Field Monitoring and may depend on the site history, radiological status, use, and general conditions. Additional surveys may be requested at irregular frequencies if conditions warrant. All radioactive wastes sites are scheduled to be surveyed at least annually. Any newly discovered wastes sites not documented by this schedule will be included in the revised schedule for CY 1998. The outside perimeter road surveys of 200 East and West Area and the rail survey from the 300 Area to Columbia Center will be performed in the year 2000 per agreement with Department of Energy. Richland Field Office. This schedule does not discuss staffing needs, nor does it list the monitoring equipment to be used in completing specific routines. Personnel performing routines to meet this schedule shall communicate any need for assistance in completing these routines to Radiological Control management and Near-Field Monitoring. After each routine survey is completed, a copy of the survey record, maps, and data sheets will be forwarded to Near-Field Monitoring. These routine surveys will not be considered complete until this documentation is received. At the end of each month, the ERC and PHMC radiological control organizations shall forward a copy of the Routine

  2. Scheduling nurses’ shifts at PGI Cikini Hospital

    Science.gov (United States)

    Nainggolan, J. C. T.; Kusumastuti, R. D.

    2018-03-01

    Hospitals play an essential role in the community by providing medical services to the public. In order to provide high quality medical services, hospitals must manage their resources (including nurses) effectively and efficiently. Scheduling of nurses’ work shifts, in particular, is crucial, and must be conducted carefully to ensure availability and fairness. This research discusses the job scheduling system for nurses in PGI Cikini Hospital, Jakarta with Goal Programming approach. The research objectives are to identify nurse scheduling criteria and find the best schedule that can meet the criteria. The model has hospital regulations (including government regulations) as hard constraints, and nurses’ preferences as soft constraints. We gather primary data (hospital regulations and nurses’ preferences) through interviews with three Head Nurses and distributing questionnaires to fifty nurses. The results show that on the best schedule, all hard constraints can be satisfied. However, only two out of four soft constraints are satisfied. Compared to current scheduling practice, the resulting schedule ensures the availability of nurses as it satisfies all hospital’s regulations and it has a higher level of fairness as it can accommodate some of the nurses’ preferences.

  3. An Efficient Grid Scheduling Algorithm with Fault Tolerance and User Satisfaction

    Directory of Open Access Journals (Sweden)

    P. Keerthika

    2013-01-01

    Full Text Available Problem Statement. The advances in human civilization lead to more complications in problem solving. Grid computing serves as an efficient technology in solving those complicated problems. In computational grids, the grid scheduler schedules the task and finds the appropriate resource for each task. The scheduler must consider several factors such as user demand, communication time, failure handling mechanisms, and reduced makespan. Most of the existing algorithms do not consider user satisfaction. Thus a scheduling algorithm that handles failure of resources and achieves user satisfaction gains more importance. Approach. A new bicriteria scheduling algorithm (BSA that considers user satisfaction along with fault tolerance has been introduced. The main contribution of this paper includes achieving user satisfaction along with fault tolerance and minimizing the makespan of jobs. Results. The performance of this proposed algorithm is evaluated using GridSim based on makespan and number of jobs completed successfully within user deadline. Conclusions/Recommendations. The proposed BSA algorithm achieves reduced makespan and better hit rate with higher user satisfaction and fault tolerance.

  4. Optimal deployment schedule of an active twist rotor for performance enhancement and vibration reduction in high-speed flights

    Directory of Open Access Journals (Sweden)

    Young H. YOU

    2017-08-01

    Full Text Available The best active twist schedules exploiting various waveform types are sought taking advantage of the global search algorithm for the reduction of hub vibration and/or power required of a rotor in high-speed conditions. The active twist schedules include two non-harmonic inputs formed based on segmented step functions as well as the simple harmonic waveform input. An advanced Particle Swarm assisted Genetic Algorithm (PSGA is employed for the optimizer. A rotorcraft Computational Structural Dynamics (CSD code CAMRAD II is used to perform the rotor aeromechanics analysis. A Computation Fluid Dynamics (CFD code is coupled with CSD for verification and some physical insights. The PSGA optimization results are verified against the parameter sweep study performed using the harmonic actuation. The optimum twist schedules according to the performance and/or vibration reduction strategy are obtained and their optimization gains are compared between the actuation cases. A two-phase non-harmonic actuation schedule demonstrates the best outcome in decreasing the power required while a four-phase non-harmonic schedule results in the best vibration reduction as well as the simultaneous reductions in the power required and vibration. The mechanism of reduction to the performance gains is identified illustrating the section airloads, angle-of-attack distribution, and elastic twist deformation predicted by the present approaches.

  5. Schedule Matters: Understanding the Relationship between Schedule Delays and Costs on Overruns

    Science.gov (United States)

    Majerowicz, Walt; Shinn, Stephen A.

    2016-01-01

    This paper examines the relationship between schedule delays and cost overruns on complex projects. It is generally accepted by many project practitioners that cost overruns are directly related to schedule delays. But what does "directly related to" actually mean? Some reasons or root causes for schedule delays and associated cost overruns are obvious, if only in hindsight. For example, unrealistic estimates, supply chain difficulties, insufficient schedule margin, technical problems, scope changes, or the occurrence of risk events can negatively impact schedule performance. Other factors driving schedule delays and cost overruns may be less obvious and more difficult to quantify. Examples of these less obvious factors include project complexity, flawed estimating assumptions, over-optimism, political factors, "black swan" events, or even poor leadership and communication. Indeed, is it even possible the schedule itself could be a source of delay and subsequent cost overrun? Through literature review, surveys of project practitioners, and the authors' own experience on NASA programs and projects, the authors will categorize and examine the various factors affecting the relationship between project schedule delays and cost growth. The authors will also propose some ideas for organizations to consider to help create an awareness of the factors which could cause or influence schedule delays and associated cost growth on complex projects.

  6. A Comparison between Fixed Priority and EDF Scheduling accounting for Cache Related Pre-emption Delays

    Directory of Open Access Journals (Sweden)

    Will Lunniss

    2014-04-01

    Full Text Available In multitasking real-time systems, the choice of scheduling algorithm is an important factor to ensure that response time requirements are met while maximising limited system resources. Two popular scheduling algorithms include fixed priority (FP and earliest deadline first (EDF. While they have been studied in great detail before, they have not been compared when taking into account cache related pre-emption delays (CRPD. Memory and cache are split into a number of blocks containing instructions and data. During a pre-emption, cache blocks from the pre-empting task can evict those of the pre-empted task. When the pre-empted task is resumed, if it then has to re-load the evicted blocks, CRPD are introduced which then affect the schedulability of the task. In this paper we compare FP and EDF scheduling algorithms in the presence of CRPD using the state-of-the-art CRPD analysis. We find that when CRPD is accounted for, the performance gains offered by EDF over FP, while still notable, are diminished. Furthermore, we find that under scenarios that cause relatively high CRPD, task layout optimisation techniques can be applied to allow FP to schedule tasksets at a similar processor utilisation to EDF. Thus making the choice of the task layout in memory as important as the choice of scheduling algorithm. This is very relevant for industry, as it is much cheaper and simpler to adjust the task layout through the linker than it is to switch the scheduling algorithm.

  7. Technology for planning and scheduling under complex constraints

    Science.gov (United States)

    Alguire, Karen M.; Pedro Gomes, Carla O.

    1997-02-01

    Within the context of law enforcement, several problems fall into the category of planning and scheduling under constraints. Examples include resource and personnel scheduling, and court scheduling. In the case of court scheduling, a schedule must be generated considering available resources, e.g., court rooms and personnel. Additionally, there are constraints on individual court cases, e.g., temporal and spatial, and between different cases, e.g., precedence. Finally, there are overall objectives that the schedule should satisfy such as timely processing of cases and optimal use of court facilities. Manually generating a schedule that satisfies all of the constraints is a very time consuming task. As the number of court cases and constraints increases, this becomes increasingly harder to handle without the assistance of automatic scheduling techniques. This paper describes artificial intelligence (AI) technology that has been used to develop several high performance scheduling applications including a military transportation scheduler, a military in-theater airlift scheduler, and a nuclear power plant outage scheduler. We discuss possible law enforcement applications where we feel the same technology could provide long-term benefits to law enforcement agencies and their operations personnel.

  8. NRC comprehensive records disposition schedule. Revision 3

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    Title 44 US Code, ``Public Printing and Documents,`` regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ``Management and Use of Information and Records,`` and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ``Records Management,`` require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA`s General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ``NRC`s Comprehensive Records Disposition Schedule,`` and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA`s General Records Schedule (dated August 1995).

  9. NRC comprehensive records disposition schedule. Revision 3

    International Nuclear Information System (INIS)

    1998-02-01

    Title 44 US Code, ''Public Printing and Documents,'' regulations issued by the General Service Administration (GSA) in 41 CFR Chapter 101, Subchapter B, ''Management and Use of Information and Records,'' and regulations issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter 12, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 3, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 3 incorporates NARA approved changes and additions to the NRC schedules that have been implemented since the last revision dated March, 1992, reflects recent organizational changes implemented at the NRC, and includes the latest version of NARA's General Records Schedule (dated August 1995)

  10. Using icons to convey medication schedule information.

    Science.gov (United States)

    Morrow, D G; Leirer, V O; Andrassy, J M

    1996-08-01

    We examined older adult comprehension and memory for medication schedules conveyed by different types of visual icons as well as text. Three icons were compared: a timeline, a pair of 12 h clocks (one for AM and one for PM hours) and a 24 h clock. In Experiment 1, older and younger participants paraphrased and then recalled schedules that were conveyed by the three icons or by text. Text and timeline schedules were paraphrased more accurately than either clock icon. Paraphrase errors suggested that subjects had trouble integrating schedule information across the two 12 h clocks. Analysis of paraphrase times showed that the text schedule was paraphrased most quickly, followed by the timeline, the 24 h clock and the 12 h clock. No differences were found for the accuracy of recalling the icon and text schedules. Experiment 2 examined free and cued recall after limited study time by older adults. Because text superiority in Experiment 1 may have reflected greater familiarity with text than with icons, recall was examined across four trials in Experiment 2. Text was recalled most accurately, followed by the timeline, the 24 h clock and the 12 h clock. Study-test trials did not influence recall. Text schedules may have been generally more effective than the icons because of their greater familiarity. The timeline may have been the most effective icon because it was more compact and familiar than the clock icons used in the study. The findings suggest that including such icons in medication instructions requires training.

  11. Automated Scheduling Via Artificial Intelligence

    Science.gov (United States)

    Biefeld, Eric W.; Cooper, Lynne P.

    1991-01-01

    Artificial-intelligence software that automates scheduling developed in Operations Mission Planner (OMP) research project. Software used in both generation of new schedules and modification of existing schedules in view of changes in tasks and/or available resources. Approach based on iterative refinement. Although project focused upon scheduling of operations of scientific instruments and other equipment aboard spacecraft, also applicable to such terrestrial problems as scheduling production in factory.

  12. Fuzzy HRRN CPU Scheduling Algorithm

    OpenAIRE

    Bashir Alam; R. Biswas; M. Alam

    2011-01-01

    There are several scheduling algorithms like FCFS, SRTN, RR, priority etc. Scheduling decisions of these algorithms are based on parameters which are assumed to be crisp. However, in many circumstances these parameters are vague. The vagueness of these parameters suggests that scheduler should use fuzzy technique in scheduling the jobs. In this paper we have proposed a novel CPU scheduling algorithm Fuzzy HRRN that incorporates fuzziness in basic HRRN using fuzzy Technique FIS.

  13. Maritime wideband communication networks video transmission scheduling

    CERN Document Server

    Yang, Tingting

    2014-01-01

    This Springer Brief covers emerging maritime wideband communication networks and how they facilitate applications such as maritime distress, urgency, safety and general communications. It provides valuable insight on the data transmission scheduling and protocol design for the maritime wideband network. This brief begins with an introduction to maritime wideband communication networks including the architecture, framework, operations and a comprehensive survey on current developments. The second part of the brief presents the resource allocation and scheduling for video packet transmission wit

  14. Ada and cyclic runtime scheduling

    Science.gov (United States)

    Hood, Philip E.

    1986-01-01

    An important issue that must be faced while introducing Ada into the real time world is efficient and prodictable runtime behavior. One of the most effective methods employed during the traditional design of a real time system is the cyclic executive. The role cyclic scheduling might play in an Ada application in terms of currently available implementations and in terms of implementations that might be developed especially to support real time system development is examined. The cyclic executive solves many of the problems faced by real time designers, resulting in a system for which it is relatively easy to achieve approporiate timing behavior. Unfortunately a cyclic executive carries with it a very high maintenance penalty over the lifetime of the software that is schedules. Additionally, these cyclic systems tend to be quite fragil when any aspect of the system changes. The findings are presented of an ongoing SofTech investigation into Ada methods for real time system development. The topics covered include a description of the costs involved in using cyclic schedulers, the sources of these costs, and measures for future systems to avoid these costs without giving up the runtime performance of a cyclic system.

  15. Hybrid job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1995-01-01

    We consider the problem of scheduling jobs in a hybrid job shop. We use the term 'hybrid' to indicate that we consider a lot of extensions of the classic job shop, such as transportation times, multiple resources, and setup times. The Shifting Bottleneck procedure can be generalized to deal with

  16. Iterative robust multiprocessor scheduling

    NARCIS (Netherlands)

    Adyanthaya, S.; Geilen, M.; Basten, T.; Voeten, J.; Schiffelers, R.

    2015-01-01

    General purpose platforms are characterized by unpredictable timing behavior. Real-time schedules of tasks on general purpose platforms need to be robust against variations in task execution times. We define robustness in terms of the expected number of tasks that miss deadlines. We present an

  17. Practical job shop scheduling

    NARCIS (Netherlands)

    Schutten, Johannes M.J.

    1998-01-01

    The Shifting Bottleneck procedure is an intuitive and reasonably good approximation algorithm for the notoriously difficult classical job shop scheduling problem. The principle of decomposing a classical job shop problem into a series of single-machine problems can also easily be applied to job shop

  18. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L E

    1992-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. Samples for radiological analyses include Air-Particulate Filter, gases and vapor; Water/Columbia River, Onsite Pond, Spring, Irrigation, and Drinking; Foodstuffs/Animal Products including Whole Milk, Poultry and Eggs, and Beef; Foodstuffs/Produce including Leafy Vegetables, Vegetables, and Fruit; Foodstuffs/Farm Products including Wine, Wheat and Alfalfa; Wildlife; Soil; Vegetation; and Sediment. Direct Radiation Measurements include Terrestrial Locations, Columbia River Shoreline Locations, and Onsite Roadway, Railway and Aerial, Radiation Surveys.

  19. Relational Information Gain

    DEFF Research Database (Denmark)

    Lippi, Marco; Jaeger, Manfred; Frasconi, Paolo

    2011-01-01

    We introduce relational information gain, a refinement scoring function measuring the informativeness of newly introduced variables. The gain can be interpreted as a conditional entropy in a well-defined sense and can be efficiently approximately computed. In conjunction with simple greedy general......-to-specific search algorithms such as FOIL, it yields an efficient and competitive algorithm in terms of predictive accuracy and compactness of the learned theory. In conjunction with the decision tree learner TILDE, it offers a beneficial alternative to lookahead, achieving similar performance while significantly...

  20. Receiver Gain Modulation Circuit

    Science.gov (United States)

    Jones, Hollis; Racette, Paul; Walker, David; Gu, Dazhen

    2011-01-01

    A receiver gain modulation circuit (RGMC) was developed that modulates the power gain of the output of a radiometer receiver with a test signal. As the radiometer receiver switches between calibration noise references, the test signal is mixed with the calibrated noise and thus produces an ensemble set of measurements from which ensemble statistical analysis can be used to extract statistical information about the test signal. The RGMC is an enabling technology of the ensemble detector. As a key component for achieving ensemble detection and analysis, the RGMC has broad aeronautical and space applications. The RGMC can be used to test and develop new calibration algorithms, for example, to detect gain anomalies, and/or correct for slow drifts that affect climate-quality measurements over an accelerated time scale. A generalized approach to analyzing radiometer system designs yields a mathematical treatment of noise reference measurements in calibration algorithms. By treating the measurements from the different noise references as ensemble samples of the receiver state, i.e. receiver gain, a quantitative description of the non-stationary properties of the underlying receiver fluctuations can be derived. Excellent agreement has been obtained between model calculations and radiometric measurements. The mathematical formulation is equivalent to modulating the gain of a stable receiver with an externally generated signal and is the basis for ensemble detection and analysis (EDA). The concept of generating ensemble data sets using an ensemble detector is similar to the ensemble data sets generated as part of ensemble empirical mode decomposition (EEMD) with exception of a key distinguishing factor. EEMD adds noise to the signal under study whereas EDA mixes the signal with calibrated noise. It is mixing with calibrated noise that permits the measurement of temporal-functional variability of uncertainty in the underlying process. The RGMC permits the evaluation of EDA by

  1. Creative employee scheduling in the health information management department.

    Science.gov (United States)

    Hyde, C S

    1998-02-01

    What effect do schedules have on employees and department activities? Negative effects such as backlogs, poor employee morale, and absenteeism may be due to scheduling practices currently in place. The value of effective employee scheduling practices may be seen in areas of improved productivity. The process of developing schedules should include assessing department areas, understanding operational needs, choosing an option, and implementation. Finding a schedule that meets the needs of managers as well as those of the employees is rewarding. It is a win-win situation, and the benefits can yield increased productivity, decreased turnover, and higher morale.

  2. 76 FR 65424 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Science.gov (United States)

    2011-10-21

    ... cause. 21 U.S.C. 812. The initial schedules of controlled substances by statute are found at 21 U.S.C... substances such as alprazolam can range from mild dysphoria and insomnia to a major syndrome including...

  3. 78 FR 21818 - Schedules of Controlled Substances: Placement of Methylone Into Schedule I

    Science.gov (United States)

    2013-04-12

    ... hyperthermia, seizures, hyponatremia, bruxism, sweating, hypertension, tachycardia, headache, palpitations... departments of individuals exposed to methylone with symptoms that include tachycardia, headache, palpitations... medical use, classification of methylone as a Schedule I controlled substance was appropriate. Another...

  4. Routing and scheduling problems

    DEFF Research Database (Denmark)

    Reinhardt, Line Blander

    be that the objects routed have an availability time window and a delivery time window or that locations on the path have a service time window. When routing moving transportation objects such as vehicles and vessels schedules are made in connection with the routing. Such schedules represent the time for the presence......In today’s globalized society, transport contributes to our daily life in many different ways. The production of the parts for a shelf ready product may take place on several continents and our travel between home and work, vacation travel and business trips has increased in distance the last...... couple of decades. To deliver competitive service and price, transportation today needs to be cost effective. A company requiring for things to be shipped will aim at having the freight shipped as cheaply as possible while often satisfying certain time constraints. For the transportation company...

  5. The JFACC Planner/Scheduler

    National Research Council Canada - National Science Library

    2002-01-01

    ... (the JFACC Planner/Scheduler, or JPS) that supports generation of tightly linked air operations plans and schedules, as well as their adaptation in response to changing tasks and resource availability...

  6. Integrated test schedule for buried waste integrated demonstration

    International Nuclear Information System (INIS)

    Brown, J.T.; McDonald, J.K.

    1992-05-01

    The Integrated Test Schedule incorporates the various schedules the Buried Waste Integrated Demonstration (BWID) supports into one document. This document contains the Federal Facilities Agreement and Consent Order schedules for the Idaho National Engineering Laboratory, Hanford Reservation, Oak Ridge Reservation, and Fernald Environmental Materials Center. Included in the Integrated Test Schedule is the Buried Waste Integrated Demonstration ''windows of opportunity'' schedule. The ''windows of opportunity'' schedule shows periods of time in which Buried Waste Integrated Demonstration Program-sponsored technology demonstrations could support key decisions in the Federal Facilities Agreement and Consent Order. Schedules for the Buried Waste Integrated Demonstration-sponsored technology task plans are categorized by technology area and divided by current fiscal year and out-year. Total estimated costs for Buried Waste Integrated Demonstration-sponsored Technology Task Plans for FY-92 through FY-97 are $74.756M

  7. Measurement of Antenna Bore-Sight Gain

    Science.gov (United States)

    Fortinberry, Jarrod; Shumpert, Thomas H.

    2016-01-01

    The absolute or free-field gain of a simple antenna can be approximated using standard antenna theory formulae or for a more accurate prediction, numerical methods may be employed to solve for antenna parameters including gain. Both of these methods will result in relatively reasonable estimates but in practice antenna gain is usually verified and documented via measurements and calibration. In this paper, a relatively simple and low-cost, yet effective means of determining the bore-sight free-field gain of a VHF/UHF antenna is proposed by using the Brewster angle relationship.

  8. An introduction to optimal satellite range scheduling

    CERN Document Server

    Vázquez Álvarez, Antonio José

    2015-01-01

    The satellite range scheduling (SRS) problem, an important operations research problem in the aerospace industry consisting of allocating tasks among satellites and Earth-bound objects, is examined in this book. SRS principles and solutions are applicable to many areas, including: Satellite communications, where tasks are communication intervals between sets of satellites and ground stations Earth observation, where tasks are observations of spots on the Earth by satellites Sensor scheduling, where tasks are observations of satellites by sensors on the Earth. This self-contained monograph begins with a structured compendium of the problem and moves on to explain the optimal approach to the solution, which includes aspects from graph theory, set theory, game theory and belief networks. This book is accessible to students, professionals and researchers in a variety of fields, including: operations research, optimization, scheduling theory, dynamic programming and game theory. Taking account of the distributed, ...

  9. Quarterly report on program cost and schedule

    International Nuclear Information System (INIS)

    1989-07-01

    This report is intended to provide a summary of the cost and schedule performance for the Civilian Radioactive Waste Management Program. Performance data are presented for each of the major program elements. Also included in this report is the status of the Nuclear Waste Fund revenues and disbursements. This report includes project performance data reported through March 1989

  10. Determinants of rapid weight gain during infancy: baseline results from the NOURISH randomised controlled trial

    Directory of Open Access Journals (Sweden)

    Mihrshahi Seema

    2011-11-01

    Full Text Available Abstract Background Rapid weight gain in infancy is an important predictor of obesity in later childhood. Our aim was to determine which modifiable variables are associated with rapid weight gain in early life. Methods Subjects were healthy infants enrolled in NOURISH, a randomised, controlled trial evaluating an intervention to promote positive early feeding practices. This analysis used the birth and baseline data for NOURISH. Birthweight was collected from hospital records and infants were also weighed at baseline assessment when they were aged 4-7 months and before randomisation. Infant feeding practices and demographic variables were collected from the mother using a self administered questionnaire. Rapid weight gain was defined as an increase in weight-for-age Z-score (using WHO standards above 0.67 SD from birth to baseline assessment, which is interpreted clinically as crossing centile lines on a growth chart. Variables associated with rapid weight gain were evaluated using a multivariable logistic regression model. Results Complete data were available for 612 infants (88% of the total sample recruited with a mean (SD age of 4.3 (1.0 months at baseline assessment. After adjusting for mother's age, smoking in pregnancy, BMI, and education and infant birthweight, age, gender and introduction of solid foods, the only two modifiable factors associated with rapid weight gain to attain statistical significance were formula feeding [OR = 1.72 (95%CI 1.01-2.94, P = 0.047] and feeding on schedule [OR = 2.29 (95%CI 1.14-4.61, P = 0.020]. Male gender and lower birthweight were non-modifiable factors associated with rapid weight gain. Conclusions This analysis supports the contention that there is an association between formula feeding, feeding to schedule and weight gain in the first months of life. Mechanisms may include the actual content of formula milk (e.g. higher protein intake or differences in feeding styles, such as feeding to schedule

  11. 75 FR 65279 - Schedule for Rating Disabilities; AL Amyloidosis (Primary Amyloidosis)

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 4 RIN 2900-AN75 Schedule for Rating Disabilities; AL... document proposes to amend the Department of Veterans Affairs (VA) Schedule for Rating Disabilities (rating schedule) by updating the schedule of ratings for the hemic and lymphatic systems to include AL amyloidosis...

  12. Personnel scheduling using an integer programming model- an application at Avanti Blue-Nile Hotels.

    Science.gov (United States)

    Kassa, Biniyam Asmare; Tizazu, Anteneh Eshetu

    2013-01-01

    In this paper, we report perhaps a first of its kind application of management science in the Ethiopian hotel industry. Avanti Blue Nile Hotels, a newly established five star hotel in Bahir Dar, is the company for which we developed an integer programming model that determines an optimal weekly shift schedule for the Hotel's engineering department personnel while satisfying several constraints including weekly rest requirements per employee, rest requirements between working shifts per employee, required number of personnel per shift, and other constraints. The model is implemented on an excel solver routine. The model enables the company's personnel department management to develop a fair personnel schedule as needed and to effectively utilize personnel resources while satisfying several technical, legal and economic requirements. These encouraging achievements make us optimistic about the gains other Ethiopian organizations can amass by introducing management science approaches in their management planning and decision making systems.

  13. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1982-07-01

    Effective January 1, 1982, NRC will institute records retention and disposal practices in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 22 which apply to housekeeping or facilitative records. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  14. Gaining Relational Competitive Advantages

    DEFF Research Database (Denmark)

    Hu, Yimei; Zhang, Si; Li, Jizhen

    2015-01-01

    Establishing strategic technological partnerships (STPs) with foreign partners is an increasingly studied topic within the innovation management literature. Partnering firms can jointly create sources of relational competitive advantage. Chinese firms often lack research and development (R......&D) capabilities but are increasingly becoming preferred technological partners for transnational corporations. We investigate an STP between a Scandinavian and a Chinese firm and try to explore how to gain relational competitive advantage by focusing on its two essential stages: relational rent generation...... and appropriation. Based on an explorative case study, we develop a conceptual framework that consists of process, organizational alliance factors, and coordination modes that we propose lead to relational competitive advantage....

  15. The CHI 2013 interactive schedule

    DEFF Research Database (Denmark)

    Satyanarayan, Arvind; Strazzulla, Daniel; Klokmose, Clemens Nylandsted

    2013-01-01

    CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event is availa......CHI 2013 offers over 500 separate events including paper presentations, panels, courses, case studies and special interest groups. Given the size of the conference, it is no longer practical to host live summaries of these events. Instead, a 30-second Video Preview summary of each event...... is available. The CHI'13 Interactive Schedule helps attendees navigate this wealth of video content in order to identify events they would like to attend. It consists of a number of large display screens throughout the conference venue which cycle through a video playlist of events. Attendees can interact...

  16. RAMAN amplifier gain dynamics with ASE : Numerical analysis and ...

    African Journals Online (AJOL)

    DR OKE

    Raman fiber amplifier (RFA) has merit of arbitrary gain bandwidth, which were recently being recognized as an enabling ... has several advantages including lower noise figure (NF), flexibility on the selection of gain medium, and wide gain bandwidth ..... The Signal Gain (Gs) characteristic for varying Pump Power (Pp).

  17. Healthcare Scheduling by Data Mining: Literature Review and Future Directions

    Directory of Open Access Journals (Sweden)

    Maria M. Rinder

    2012-01-01

    Full Text Available This article presents a systematic literature review of the application of industrial engineering methods in healthcare scheduling, with a focus on the role of patient behavior in scheduling. Nine articles that used mathematical programming, data mining, genetic algorithms, and local searches for optimum schedules were obtained from an extensive search of literature. These methods are new approaches to solve the problems in healthcare scheduling. Some are adapted from areas such as manufacturing and transportation. Key findings from these studies include reduced time for scheduling, capability of solving more complex problems, and incorporation of more variables and constraints simultaneously than traditional scheduling methods. However, none of these methods modeled no-show and walk-ins patient behavior. Future research should include more variables related to patient and/or environment.

  18. Fundamentals of Shiftwork Scheduling

    Science.gov (United States)

    2006-04-01

    menstrual irregularities, colds, flu, weight gain, and cardiovascular problems than day workers. It is not known whether shiftwork-related stressors or...absorbed from the stomach, its half-life in the blood stream is about three to five hours. A cup (not a mug) of coffee provides about 100 mg of caffeine

  19. Analysis of crimes committed against scheduled tribes

    Science.gov (United States)

    Khadse, Vivek P.; Akhil, P.; Anto, Christopher; Gnanasigamani, Lydia J.

    2017-11-01

    One of the curses to the society is a crime which has a deep impact on the society. Victims of crimes are the one who is impacted the most. All communities in the world are affected by crime and the criminal justice system, but largely impacted communities are the backward classes. There are many cases reported of crime committed against scheduled tribes from the year 2005 till date. This paper states the analysis of Crimes Committed against Scheduled Tribes in the year 2015 in various states and union territories in India. In this study, Multiple Linear regression techniques have been used to analyze the crimes committed against scheduled tribes’ community in India. This study compares the number of cases reported to the police station and rate of crime committed in different states in India. It also states the future prediction of the crime that would happen. It will also predict the number of cases of crime committed against the scheduled tribe that can be reported in future. The dataset which has been used in this study is taken from official Indian government repository for crimes which include different information of crimes committed against scheduled tribes in different states and union territories measured under the population census of the year 2011. This study will help different Indian states and union territory government to analyze and predict the future crimes that may occur and take appropriate measures against it before the actual crime would occur.

  20. Integrated network design and scheduling problems :

    Energy Technology Data Exchange (ETDEWEB)

    Nurre, Sarah G.; Carlson, Jeffrey J.

    2014-01-01

    We consider the class of integrated network design and scheduling problems. These problems focus on selecting and scheduling operations that will change the characteristics of a network, while being speci cally concerned with the performance of the network over time. Motivating applications of INDS problems include infrastructure restoration after extreme events and building humanitarian distribution supply chains. While similar models have been proposed, no one has performed an extensive review of INDS problems from their complexity, network and scheduling characteristics, information, and solution methods. We examine INDS problems under a parallel identical machine scheduling environment where the performance of the network is evaluated by solving classic network optimization problems. We classify that all considered INDS problems as NP-Hard and propose a novel heuristic dispatching rule algorithm that selects and schedules sets of arcs based on their interactions in the network. We present computational analysis based on realistic data sets representing the infrastructures of coastal New Hanover County, North Carolina, lower Manhattan, New York, and a realistic arti cial community CLARC County. These tests demonstrate the importance of a dispatching rule to arrive at near-optimal solutions during real-time decision making activities. We extend INDS problems to incorporate release dates which represent the earliest an operation can be performed and exible release dates through the introduction of specialized machine(s) that can perform work to move the release date earlier in time. An online optimization setting is explored where the release date of a component is not known.

  1. Real-time systems scheduling 2 focuses

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc. Scheduling is a central problem for these computing/communication systems since it is responsible for software execution in a timely manner. This book, the second of two volumes on the subject, brings together knowledge on specific topics and discusses the recent advances for some of them.  It addresses foundations as well as the latest advances and findings in real-time scheduling, giving comprehensive references to important papers, but the chapters are short and not overloaded with co

  2. Real-time systems scheduling fundamentals

    CERN Document Server

    Chetto, Maryline

    2014-01-01

    Real-time systems are used in a wide range of applications, including control, sensing, multimedia, etc.  Scheduling is a central problem for these computing/communication systems since responsible of software execution in a timely manner. This book provides state of knowledge in this domain with special emphasis on the key results obtained within the last decade. This book addresses foundations as well as the latest advances and findings in Real-Time Scheduling, giving all references to important papers. But nevertheless the chapters will be short and not overloaded with confusing details.

  3. Planning and Scheduling for Environmental Sensor Networks

    Science.gov (United States)

    Frank, J. D.

    2005-12-01

    Environmental Sensor Networks are a new way of monitoring the environment. They comprise autonomous sensor nodes in the environment that record real-time data, which is retrieved, analyzed, integrated with other data sets (e.g. satellite images, GIS, process models) and ultimately lead to scientific discoveries. Sensor networks must operate within time and resource constraints. Sensors have limited onboard memory, energy, computational power, communications windows and communications bandwidth. The value of data will depend on when, where and how it was collected, how detailed the data is, how long it takes to integrate the data, and how important the data was to the original scientific question. Planning and scheduling of sensor networks is necessary for effective, safe operations in the face of these constraints. For example, power bus limitations may preclude sensors from simultaneously collecting data and communicating without damaging the sensor; planners and schedulers can ensure these operations are ordered so that they do not happen simultaneously. Planning and scheduling can also ensure best use of the sensor network to maximize the value of collected science data. For example, if data is best recorded using a particular camera angle but it is costly in time and energy to achieve this, planners and schedulers can search for times when time and energy are available to achieve the optimal camera angle. Planning and scheduling can handle uncertainty in the problem specification; planners can be re-run when new information is made available, or can generate plans that include contingencies. For example, if bad weather may prevent the collection of data, a contingent plan can check lighting conditions and turn off data collection to save resources if lighting is not ideal. Both mobile and immobile sensors can benefit from planning and scheduling. For example, data collection on otherwise passive sensors can be halted to preserve limited power and memory

  4. Scheduling drayage operations in synchromodal transport

    NARCIS (Netherlands)

    Rivera, Arturo E.Pérez; Mes, Martijn R.K.; Bektas, Tolga; Coniglio, Stefano; Martinez-Sykora, Antonio; Voss, Stefan

    2017-01-01

    We study the problem of scheduling drayage operations in synchromodal transport. Besides the usual decisions to time the pick-up and delivery of containers, and to route the vehicles that transport them, synchromodal transport includes the assignment of terminals for empty and loaded containers. The

  5. Intensive Scheduling: When Less Is More.

    Science.gov (United States)

    Ryan, Francis, J.

    1996-01-01

    Examines the potential benefits of intensive scheduling, an alternative to traditional school day structuring that allows students to take fewer classes but stay in them longer. Suggests that fewer and longer classes accommodate more cooperative learning styles and enhance student academic performance. Includes descriptions of several intensive…

  6. Rostering and Task Scheduling

    DEFF Research Database (Denmark)

    Dohn, Anders Høeg

    to scheduling problems with temporal dependencies between tasks. However, these problems appear in various contexts and with different properties. A group of the problems considered are related to vehicle routing problems, where transportation and time windows are important factors that must be accounted for....... Mathematical and logic-based models are presented for the problems considered. Novel components are added to existing models and the modeling decisions are justified. In one case, the model is solved by a simple, but efficient greedy construction heuristic. In the remaining cases, column generation is applied....... Column generation is an iterative exact solution method based on the theory of linear programming and is capable of providing provably optimal solutions. In some of the applications, the approach is modified to provide feasible solutions of high-quality in less time. The exceptional solution quality...

  7. Le Nordais on schedule

    International Nuclear Information System (INIS)

    Anon.

    1998-01-01

    The first phase of the Le Nordais wind farm project in the Gaspe Peninsula in Quebec is on schedule. It was announced that the project's first turbines will be turning by September 1998. Hydro-Quebec has agreed to buy power from the 100 MW wind farm. The Le Nordais consortium plans to have 76,750 kW turbines in service in Cap-Chat by December 1998. Many of the foundations for the towers are poured and a substation is under construction. The turbines that are currently in use come from Denmark, but 20 of the 76 turbines being slated for installation this year will come from NEG Micon Canada Inc.'s assembly plant in Quebec. The Quebec government is providing a $5.6 million grant for their production and for turbine assembly in Quebec. During phase two, an additional 57 turbines will be installed in Matane by the end of 1999. 1 fig

  8. Joint time-frequency domain proportional fair scheduler with HARQ for 3GPP LTE systems

    OpenAIRE

    Beh, KC; Doufexi, A; Armour, SMD

    2008-01-01

    This paper explores the potential gain of joint diversity in both frequency domain and time domain which can be exploited to achieve spectral efficiency gains whilst simultaneously facilitating QoS/ fairness in an OFDMA system particularly in 3GPP Long Term Evolution (LTE)). The performance of several joint time-frequency schedulers is investigated. Simulation results show that joint time frequency schedulers achieve significantly superior performance compared to a more conventional time doma...

  9. Effects of 4X4 Block Scheduling

    Directory of Open Access Journals (Sweden)

    R. Brian Cobb

    1999-02-01

    Full Text Available The effects of a 4 X 4 block scheduling program in a middle school on a variety of student measures were investigated. These measures included standardized achievement tests in mathematics, reading, and writing, cumulative and semester grades in middle school and high school, attendance rates, and enrollment rates in advanced high school courses (in mathematics only. The block scheduling program had been in effect for four years allowing analyses of current middle and high school students who had experienced a minimum of one and one-half years of block scheduling while in middle school. The primary research design was a post-test only, matched pairs design. Students were matched on school characteristics, gender, ethnicity, grade level, and 5th grade standardized reading scores. Results were relatively consistent with the extant literature and generally positive.

  10. Distributed Research Project Scheduling Based on Multi-Agent Methods

    Directory of Open Access Journals (Sweden)

    Constanta Nicoleta Bodea

    2011-01-01

    Full Text Available Different project planning and scheduling approaches have been developed. The Operational Research (OR provides two major planning techniques: CPM (Critical Path Method and PERT (Program Evaluation and Review Technique. Due to projects complexity and difficulty to use classical methods, new approaches were developed. Artificial Intelligence (AI initially promoted the automatic planner concept, but model-based planning and scheduling methods emerged later on. The paper adresses the project scheduling optimization problem, when projects are seen as Complex Adaptive Systems (CAS. Taken into consideration two different approaches for project scheduling optimization: TCPSP (Time- Constrained Project Scheduling and RCPSP (Resource-Constrained Project Scheduling, the paper focuses on a multiagent implementation in MATLAB for TCSP. Using the research project as a case study, the paper includes a comparison between two multi-agent methods: Genetic Algorithm (GA and Ant Colony Algorithm (ACO.

  11. PLAN-IT - Scheduling assistant for solar system exploration

    International Nuclear Information System (INIS)

    Dias, W. C.; Henricks, J. A.; Wong, J. C.; California Institute of Technology, Pasadena)

    1987-01-01

    A frame-based expert scheduling system shell, PLAN-IT, is developed for spacecraft scheduling in the Request Integration Phase, using the Comet Rendezvous Asteroid Flyby (CRAF) mission as a development base. Basic, structured, and expert scheduling techniques are reviewed. Data elements such as activity representation and resource conflict representation are discussed. Resource constraints include minimum and maximum separation times between activities, percentage of time pointed at specific targets, and separation time between targeted intervals of a given activity. The different scheduling technique categories and the rationale for their selection are also considered. 13 references

  12. Techniques for cash management in scheduling manufacturing operations

    Science.gov (United States)

    Morady Gohareh, Mehdy; Shams Gharneh, Naser; Ghasemy Yaghin, Reza

    2017-10-01

    The objective in traditional scheduling is usually time based. Minimizing the makespan, total flow times, total tardi costs, etc. are instances of these objectives. In manufacturing, processing each job entails a cost paying and price receiving. Thus, the objective should include some notion of managing the flow of cash. We have defined two new objectives: maximization of average and minimum available cash. For single machine scheduling, it is demonstrated that scheduling jobs in decreasing order of profit ratios maximizes the former and improves productivity. Moreover, scheduling jobs in increasing order of costs and breaking ties in decreasing order of prices maximizes the latter and creates protection against financial instability.

  13. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1992-03-01

    Title 44 United States Code, ''Public Printing and Documents,'' regulations cited in the General Services Administration's (GSA) ''Federal Information Resources Management Regulations'' (FIRMR), Part 201-9, ''Creation, Maintenance, and Use of Records,'' and regulation issued by the National Archives and Records Administration (NARA) in 36 CFR Chapter XII, Subchapter B, ''Records Management,'' require each agency to prepare and issue a comprehensive records disposition schedule that contains the NARA approved records disposition schedules for records unique to the agency and contains the NARA's General Records Schedules for records common to several or all agencies. The approved records disposition schedules specify the appropriate duration of retention and the final disposition for records created or maintained by the NRC. NUREG-0910, Rev. 2, contains ''NRC's Comprehensive Records Disposition Schedule,'' and the original authorized approved citation numbers issued by NARA. Rev. 2 totally reorganizes the records schedules from a functional arrangement to an arrangement by the host office. A subject index and a conversion table have also been developed for the NRC schedules to allow staff to identify the new schedule numbers easily and to improve their ability to locate applicable schedules

  14. Operational gain : measuring the capture of genetic gain ...

    African Journals Online (AJOL)

    Operational gain : measuring the capture of genetic gain : operational deployment of technology. ... The concept of operational gain is more than the weighted average of the genetic quality of planted hectares, and encompasses tree breeding efficiencies, propagation efficiencies, matching of species and genotype to site, ...

  15. Schedules of Controlled Substances: Temporary Placement of 4-Fluoroisobutyryl Fentanyl into Schedule I. Temporary scheduling order.

    Science.gov (United States)

    2017-05-03

    The Administrator of the Drug Enforcement Administration is issuing this temporary scheduling order to schedule the synthetic opioid, N-(4-fluorophenyl)-N-(1-phenethylpiperidin-4-yl)isobutyramide (4-fluoroisobutyryl fentanyl or para-fluoroisobutyryl fentanyl), and its isomers, esters, ethers, salts and salts of isomers, esters, and ethers, into schedule I pursuant to the temporary scheduling provisions of the Controlled Substances Act. This action is based on a finding by the Administrator that the placement of 4-fluoroisobutyryl fentanyl into schedule I of the Controlled Substances Act is necessary to avoid an imminent hazard to the public safety. As a result of this order, the regulatory controls and administrative, civil, and criminal sanctions applicable to schedule I controlled substances will be imposed on persons who handle (manufacture, distribute, reverse distribute, import, export, engage in research, conduct instructional activities or chemical analysis, or possess), or propose to handle, 4-fluoroisobutyryl fentanyl.

  16. 75 FR 16198 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2010-03-31

    ..., including such records as development files, planning files, audit records, records inventories, records... send a copy of the schedule. NARA staff usually prepare appraisal memorandums that contain additional... level as well as their disposition. If NARA staff has prepared an appraisal memorandum for the schedule...

  17. The Liner Shipping Routing and Scheduling Problem Under Environmental Considerations

    DEFF Research Database (Denmark)

    Dithmer, Philip; Reinhardt, Line Blander; Kontovas, Christos

    2017-01-01

    This paper deals with the Liner Shipping Routing and Scheduling Problem (LSRSP), which consists of designing the time schedule for a vessel to visit a fixed set of ports while minimizing costs. We extend the classical problem to include the external cost of ship air emissions and we present some ...

  18. The GBT Dynamic Scheduling System: Scheduling Applications of the Knapsack Problem and Sudoku

    Science.gov (United States)

    Sessoms, E.; Clark, M.; Marganian, P.; McCarty, M.; Shelton, A.

    2009-09-01

    We applied algorithmic approaches to both theoretical and practical aspects of scheduling the Robert C. Byrd Green Bank Telescope (GBT). When using a theoretical approach to scheduling, assigning a numerical value, or score, to a telescope period is only half of the problem. The other half consists of using the score to determine the best global arrangement of the telescope periods in order to maximize the scientific throughput of the telescope. The naive brute-force approach of trying all possible schedules is too computationally expensive. Instead we applied a well-studied approach from operations research, known as dynamic programming. Specifically, we found the so-called ``knapsack'' algorithm to be a good fit to this problem. On the other hand, we cannot actually achieve maximum theoretical efficiency due to many practical constraints on telescope scheduling. The most severe practical constraints are fixed periods that must be scheduled at a specific date and time regardless of possible score and windowed periods that must be scheduled in regular, recurring intervals. The primary difficulty in scheduling fixed and windowed sessions is that they have the potential to conflict and even to generate irresolvable conflicts (double booking). In working on this problem, we realized it shared many characteristics with the game of Sudoku. In Sudoku, there are many possible arrangements of the recurring numbers 1 through 9 (telescope sessions). Some of these are fixed (the hints) and the others must live in windows (distinct groups having one instance each of each digit). Sudoku puzzles are solved algorithmically using a heuristic-guided brute-force search. We followed a similar approach. A full brute-force search is, again, too computationally expensive, but we found ways to restrict the search enough to make it feasible. We used a number of heuristics but found the largest gains came from partitioning the problem into distinct subsets than can each be scheduled

  19. S-CHART - SCHEDULING CHART PROGRAM

    Science.gov (United States)

    Klinkner, E. R.

    1994-01-01

    The Scheduling Chart Program (S-Chart) uses simple menu choices to produce high quality Gantt type scheduling and production time-line charts with minimal data entry requirements. The software produces high quality charts (20, 40, and 80 day options) in 10-20 minutes including start up, data entry, and printing. Reprints take less than one minute. Some of the more significant features are as follows: speed and ease of use with menu driven selections from start to finish, storage and catalogs of all data sets for rapid access and manipulation, compact program size to permit storage of dozens of data sets on the program disc, and creation of ASCII text files of graphs for rapid printing. The final product of the plot routine is an extended ASCII character file which shows the events scheduled and actual work dates. This file may be printed from the program, from DOS, or imported to a word processor for customizing. S-Chart is not intended to take the place of commercial scheduling/project management software. However, it is a simple, somewhat limited Gantt chart plotter and scheduling tracking program with an emphasis on straightforward data entry. There is no complex relationship building between the scheduled events. Dates are entered as dates, not as algebraic functions. All the files of S-Chart, except for the graph picture and the stand-alone executable, were written in 100% dBASE III compatible code. The executable code was created with CLIPPER and the graph picture files are written in ASCII code. S-Chart was implemented on an IBM PC series machine under DOS and requires 215k bytes of memory. The program was developed in 1988.

  20. Understanding weight gain at menopause.

    Science.gov (United States)

    Davis, S R; Castelo-Branco, C; Chedraui, P; Lumsden, M A; Nappi, R E; Shah, D; Villaseca, P

    2012-10-01

    The aim of this review was to summarize the literature regarding the impact of the menopause transition on body weight and body composition. We conducted a search of the literature using Medline (Ovid, 1946-present) and PubMed (1966-2012) for English-language studies that included the following search terms: 'menopause', 'midlife', 'hormone therapy' or 'estrogen' combined with 'obesity', 'body weight' or 'body composition'. Whereas weight gain per se cannot be attributed to the menopause transition, the change in the hormonal milieu at menopause is associated with an increase in total body fat and an increase in abdominal fat. Weight excess at midlife is not only associated with a heightened risk of cardiovascular and metabolic disease, but also impacts adversely on health-related quality of life and sexual function. Animal and human studies indicate that this tendency towards central abdominal fat accumulation is ameliorated by estrogen therapy. Studies mostly indicate a reduction in overall fat mass with estrogen and estrogen-progestin therapy, improved insulin sensitivity and a lower rate of development of type 2 diabetes. The hormonal changes across the perimenopause substantially contribute to increased abdominal obesity which leads to additional physical and psychological morbidity. There is strong evidence that estrogen therapy may partly prevent this menopause-related change in body composition and the associated metabolic sequelae. However, further studies are required to identify the women most likely to gain metabolic benefit from menopausal hormone therapy in order to develop evidence-based clinical recommendations.

  1. Nontraditional work schedules for pharmacists.

    Science.gov (United States)

    Mahaney, Lynnae; Sanborn, Michael; Alexander, Emily

    2008-11-15

    Nontraditional work schedules for pharmacists at three institutions are described. The demand for pharmacists and health care in general continues to increase, yet significant material changes are occurring in the pharmacy work force. These changing demographics, coupled with historical vacancy rates and turnover trends for pharmacy staff, require an increased emphasis on workplace changes that can improve staff recruitment and retention. At William S. Middleton Memorial Veterans Affairs Hospital in Madison, Wisconsin, creative pharmacist work schedules and roles are now mainstays to the recruitment and retention of staff. The major challenge that such scheduling presents is the 8 hours needed to prepare a six-week schedule. Baylor Medical Center at Grapevine in Dallas, Texas, has a total of 45 pharmacy employees, and slightly less than half of the 24.5 full-time-equivalent staff work full-time, with most preferring to work one, two, or three days per week. As long as the coverage needs of the facility are met, Envision Telepharmacy in Alpine, Texas, allows almost any scheduling arrangement preferred by individual pharmacists or the pharmacist group covering the facility. Staffing involves a great variety of shift lengths and intervals, with shifts ranging from 2 to 10 hours. Pharmacy leaders must be increasingly aware of opportunities to provide staff with unique scheduling and operational enhancements that can provide for a better work-life balance. Compressed workweeks, job-sharing, and team scheduling were the most common types of alternative work schedules implemented at three different institutions.

  2. Scheduling in the operating theatre.

    OpenAIRE

    Rose, M. B.; Davies, D. C.

    1984-01-01

    The effect of scheduling on the use of operating theatre time has been studied. Scheduling involved determining the average length of common operations and fitting them into the calculated available operating time. The technique has been shown to reduce significantly the variation in length of operating sessions, and it ensures the best use of available operating time.

  3. TECHNICAL COORDINATION SCHEDULE & INTEGRATION

    CERN Multimedia

    W. Zeuner

    Introduction The endgame of CMS installation in the underground cavern is in full swing, with several major milestones having been passed since the last CMS week. The Tracker was installed inside the Vactank just before the CERN end-of-year shutdown. Shortly after the reopening in 2008, the two remaining endcap disks, YE-2 and YE-1, were lowered, marking the completion of eight years of assembly in the surface building SX5. The remaining tasks, before the detector can be closed for the Cosmic Run At Four Tesla (CRAFT), are the installation of the thermal shields, the cabling of the negative endcap, the cabling of the tracker and the beam pipe installation. In addition to these installation tasks, a test closure of the positive endcap is planned just before the installation of the central beam pipe. The schedule is tight and complicated but the goal to close CMS by the end of May for a cosmic test with magnetic field remains feasible. Safety With all large components now being underground, the shortage...

  4. Bulletin publication schedule

    CERN Multimedia

    Publications Section, DG-CO Group

    2011-01-01

    The final edition (Nos 51-52/2011 and 1-2-3/2012) of the Bulletin this year will be published on Friday 16 December and will cover events at CERN from 19 December 2011 to 19 January 2012. Announcements for publication in this issue should reach the Communication Group or the Staff Association, as appropriate, by noon on Tuesday 13 December. Bulletin publication schedule for 2012 The table below lists the 2012 publication dates for the paper version of the Bulletin and the corresponding deadlines for the submission of announcements. Please note that all announcements must be submitted by 12.00 noon on Tuesdays at the latest.   Bulletin No. Week number Submission of announcements (before 12.00 midday) Bulletin Web version Bulletin Printed version 4-5   Tuesday 17 January Fridays 20 and 27 January Wednesday25 January 6-7   Tuesday 31 January Fridays 3 and 10 February Wednesday 8 February 8-9 Tuesday 14 February Fridays 17 and 24 february Wednesday 22 Februa...

  5. Project schedule and cost estimate report

    International Nuclear Information System (INIS)

    1988-03-01

    All cost tables represent obligation dollars, at both a constant FY 1987 level and an estimated escalation level, and are based on the FY 1989 DOE Congressional Budget submittal of December 1987. The cost tables display the total UMTRA Project estimated costs, which include both Federal and state funding. The Total Estimated Cost (TEC) for the UMTRA Project is approximately $992.5 million (in 1987 escalated dollars). Project schedules have been developed that provide for Project completion by September 1994, subject to Congressional approval extending DOE's authorization under Public Law 95-604. The report contains site-specific demographic data, conceptual design assumptions, preliminary cost estimates, and site schedules. A general project overview is also presented, which includes a discussion of the basis for the schedule and cost estimates, contingency assumptions, work breakdown structure, and potential project risks. The schedules and cost estimates will be revised as necessary to reflect appropriate decisions relating to relocation of certain tailings piles, or other special design considerations or circumstances (such as revised EPA groundwater standards), and changes in the Project mission. 27 figs', 97 tabs

  6. Scheduling with Automatic Resolution of Conflicts

    Science.gov (United States)

    Clement, Bradley; Schaffer, Steve

    2006-01-01

    DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

  7. Performance of Downlink Frequency Domain Packet Scheduling for the UTRAN Long Term Evolution

    DEFF Research Database (Denmark)

    Pokhariyal, Akhilesh; Kolding, Troels E.; Mogensen, Preben

    2006-01-01

    -blind, but time-opportunistic scheduling, FDPS shows gain in both average system capacity and cell-edge data rates on the order of 40%. However, FDPS performance is shown to depend significantly on the frequency-domain scheduling resolution as well as the accuracy of the channel state reports. Assuming Typical...... Urban channel profile, studies show that the scheduling resolution should preferably be as low as 375 kHz to yield significant FDPS gain and the std. of the error of radio state reports need to be kept within 1.5-2 dB....

  8. PLACEMENT APPLICATIONS SCHEDULING LECTURE IN INTERNATIONAL PROGRAM UNIKOM BASED ANDROID

    Directory of Open Access Journals (Sweden)

    Andri Sahata Sitanggang

    2017-12-01

    Full Text Available One who determines life of a classroom namely mapping scheduling courses especially at college. The process scheduling has included time or schedule of a class of available, room available, lecture who is scheduled for, and schedule for lecturer going to teach. Hopefully with a scheduling it will facilitate the students and teachers in obtaining information lecture schedule. With the emergence of the android application ( is implanted in mobile phones , the public can now use the internet so fast that is based .So with that researchers give one a technology based solutions to build android application .This is because one of the technology has given the functions which may make it easier for students and university lecturers in terms of access to information. In building this application used method of the prototype consisting 2 access namely access user and admin , where module user consisting of modules register , login , scheduling module , while for admin given module login , register and arrangement information scheduling courses both the administration and lecturers .Application made will be integrated with internet so that this program is real-time application.

  9. Astronaut Office Scheduling System Software

    Science.gov (United States)

    Brown, Estevancio

    2010-01-01

    AOSS is a highly efficient scheduling application that uses various tools to schedule astronauts weekly appointment information. This program represents an integration of many technologies into a single application to facilitate schedule sharing and management. It is a Windows-based application developed in Visual Basic. Because the NASA standard office automation load environment is Microsoft-based, Visual Basic provides AO SS developers with the ability to interact with Windows collaboration components by accessing objects models from applications like Outlook and Excel. This also gives developers the ability to create newly customizable components that perform specialized tasks pertaining to scheduling reporting inside the application. With this capability, AOSS can perform various asynchronous tasks, such as gathering/ sending/ managing astronauts schedule information directly to their Outlook calendars at any time.

  10. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    Science.gov (United States)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  11. Joint Network Coding and Opportunistic Scheduling for the Bidirectional Relay Channel

    KAUST Repository

    Shaqfeh, Mohammad

    2013-05-27

    In this paper, we consider a two-way communication system in which two users communicate with each other through an intermediate relay over block-fading channels. We investigate the optimal opportunistic scheduling scheme in order to maximize the long-term average transmission rate in the system assuming symmetric information flow between the two users. Based on the channel state information, the scheduler decides that either one of the users transmits to the relay, or the relay transmits to a single user or broadcasts to both users a combined version of the two users’ transmitted information by using linear network coding. We obtain the optimal scheduling scheme by using the Lagrangian dual problem. Furthermore, in order to characterize the gains of network coding and opportunistic scheduling, we compare the achievable rate of the system versus suboptimal schemes in which the gains of network coding and opportunistic scheduling are partially exploited.

  12. Autonomous power system: Integrated scheduling

    Science.gov (United States)

    Ringer, Mark J.

    1992-01-01

    The Autonomous Power System (APS) project at NASA Lewis Research Center is designed to demonstrate the abilities of integrated intelligent diagnosis, control and scheduling techniques to space power distribution hardware. The project consists of three elements: the Autonomous Power Expert System (APEX) for fault diagnosis, isolation, and recovery (FDIR), the Autonomous Intelligent Power Scheduler (AIPS) to determine system configuration, and power hardware (Brassboard) to simulate a space-based power system. Faults can be introduced into the Brassboard and in turn, be diagnosed and corrected by APEX and AIPS. The Autonomous Intelligent Power Scheduler controls the execution of loads attached to the Brassboard. Each load must be executed in a manner that efficiently utilizes available power and satisfies all load, resource, and temporal constraints. In the case of a fault situation on the Brassboard, AIPS dynamically modifies the existing schedule in order to resume efficient operation conditions. A database is kept of the power demand, temporal modifiers, priority of each load, and the power level of each source. AIPS uses a set of heuristic rules to assign start times and resources to each load based on load and resource constraints. A simple improvement engine based upon these heuristics is also available to improve the schedule efficiency. This paper describes the operation of the Autonomous Intelligent Power Scheduler as a single entity, as well as its integration with APEX and the Brassboard. Future plans are discussed for the growth of the Autonomous Intelligent Power Scheduler.

  13. Sudden gains versus gradual gains in a psychotherapy training clinic.

    Science.gov (United States)

    Greenfield, Michael F; Gunthert, Kathleen C; Haaga, David A F

    2011-01-01

    Sudden gains are abrupt and substantial improvements in symptoms. This study used the Outcome Questionnaire-45 (OQ-45; Lambert et al., 1996) to characterize sudden gains occurring in a cognitive-behavioral therapy training clinic. Also, gradual gainers were identified and used as a comparison group. Sudden gains were identified in 23% of patients and in 29% of those who entered treatment in the clinical range on the OQ, within the range of prevalence established by previous sudden gain studies in the context of randomized controlled trials (RCT's). As in earlier research, sudden gains tended to occur early in therapy. However, sudden gains were more likely to be reversed than in RCT's. Gradual gains occurred for 54% of nonsudden gainers; they were of similar magnitude to sudden gains but occurred later in therapy. Sudden gainers showed significantly better outcomes at the end of treatment than did gradual gainers. Sudden gains have clear prognostic significance, but more research is needed to determine why they may be more transient in naturalistic studies or studies involving less experienced therapists than they are in RCT's. © 2010 Wiley Periodicals, Inc.

  14. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  15. Cost-efficient scheduling of FAST observations

    Science.gov (United States)

    Luo, Qi; Zhao, Laiping; Yu, Ce; Xiao, Jian; Sun, Jizhou; Zhu, Ming; Zhong, Yi

    2018-03-01

    A cost-efficient schedule for the Five-hundred-meter Aperture Spherical radio Telescope (FAST) requires to maximize the number of observable proposals and the overall scientific priority, and minimize the overall slew-cost generated by telescope shifting, while taking into account the constraints including the astronomical objects visibility, user-defined observable times, avoiding Radio Frequency Interference (RFI). In this contribution, first we solve the problem of maximizing the number of observable proposals and scientific priority by modeling it as a Minimum Cost Maximum Flow (MCMF) problem. The optimal schedule can be found by any MCMF solution algorithm. Then, for minimizing the slew-cost of the generated schedule, we devise a maximally-matchable edges detection-based method to reduce the problem size, and propose a backtracking algorithm to find the perfect matching with minimum slew-cost. Experiments on a real dataset from NASA/IPAC Extragalactic Database (NED) show that, the proposed scheduler can increase the usage of available times with high scientific priority and reduce the slew-cost significantly in a very short time.

  16. Towards a Fair and Efficient Packet Scheduling Scheme in Inter-Flow Network Coding

    Directory of Open Access Journals (Sweden)

    Jin Wang

    2014-11-01

    Full Text Available Network coding techniques are usually applied upon network-layer protocols to improve throughput in wireless networks. In scenarios with multiple unicast sessions, fairness is also an important factor. Therefore, a network coding-aware packet-scheduling algorithm is required. A packet-scheduling algorithm determines which packet to send next from a node’s packet backlog. Existing protocols mostly employ a basic round-robin scheduling algorithm to give “equal” opportunities to different packet flows. In fact, this “equal”-opportunity scheduling is neither fair, nor efficient. This paper intends to accentuate the importance of a coding-aware scheduling scheme. With a good scheduling scheme, we can gain more control over the per-flow throughput and fairness. Specifically, we first formulate a static scheduling problem and propose an algorithm to find the optimal scheduling scheme. We then extend the technique to a dynamic setting and, later, to practical routing protocols. Results show that the algorithm is comparatively scalable, and it can improve the throughput gain when the network is not severely saturated. The fairness among flows is drastically improved as a result of this scheduling scheme.

  17. Request-Driven Schedule Automation for the Deep Space Network

    Science.gov (United States)

    Johnston, Mark D.; Tran, Daniel; Arroyo, Belinda; Call, Jared; Mercado, Marisol

    2010-01-01

    The DSN Scheduling Engine (DSE) has been developed to increase the level of automated scheduling support available to users of NASA s Deep Space Network (DSN). We have adopted a request-driven approach to DSN scheduling, in contrast to the activity-oriented approach used up to now. Scheduling requests allow users to declaratively specify patterns and conditions on their DSN service allocations, including timing, resource requirements, gaps, overlaps, time linkages among services, repetition, priorities, and a wide range of additional factors and preferences. The DSE incorporates a model of the key constraints and preferences of the DSN scheduling domain, along with algorithms to expand scheduling requests into valid resource allocations, to resolve schedule conflicts, and to repair unsatisfied requests. We use time-bounded systematic search with constraint relaxation to return nearby solutions if exact ones cannot be found, where the relaxation options and order are under user control. To explore the usability aspects of our approach we have developed a graphical user interface incorporating some crucial features to make it easier to work with complex scheduling requests. Among these are: progressive revelation of relevant detail, immediate propagation and visual feedback from a user s decisions, and a meeting calendar metaphor for repeated patterns of requests. Even as a prototype, the DSE has been deployed and adopted as the initial step in building the operational DSN schedule, thus representing an important initial validation of our overall approach. The DSE is a core element of the DSN Service Scheduling Software (S(sup 3)), a web-based collaborative scheduling system now under development for deployment to all DSN users.

  18. 26 CFR 1.1247-3 - Treatment of capital gains.

    Science.gov (United States)

    2010-04-01

    ... portion of the excess capital gains were designated. The amount so includible by the partnership shall be... 26 Internal Revenue 11 2010-04-01 2010-04-01 true Treatment of capital gains. 1.1247-3 Section 1... (CONTINUED) INCOME TAXES Special Rules for Determining Capital Gains and Losses § 1.1247-3 Treatment of...

  19. Immunization Schedules for Infants and Children

    Science.gov (United States)

    ... ACIP Vaccination Recommendations Why Immunize? Vaccines: The Basics Immunization Schedule for Infants and Children (Birth through 6 ... any questions please talk to your doctor. 2018 Immunization Schedule Recommended Vaccinations for Infants and Children Schedule ...

  20. When greediness fails: examples from stochastic scheduling

    NARCIS (Netherlands)

    Uetz, Marc Jochen

    2003-01-01

    The purpose of this paper is to present examples for the sometimes surprisingly different behavior of deterministic and stochastic scheduling problems. In particular, it demonstrates some seemingly counterintuitive properties of optimal scheduling policies for stochastic machine scheduling problems.

  1. Immunization Schedules for Preteens and Teens

    Science.gov (United States)

    ... Vaccines: The Basics Immunization Schedule for Preteens and Teens (7 through 18 Years) Recommend on Facebook Tweet ... 2018 Immunization Schedule Recommended Vaccinations for Preteens and Teens Schedule for preteens and teens (7 through 18 ...

  2. An Efficient Scheduling Scheme to Enhance the Capacity of VoIP Services in Evolved UTRA Uplink

    Directory of Open Access Journals (Sweden)

    Kim Yong-Seok

    2008-01-01

    Full Text Available An efficient scheduling scheme is proposed to increase the available capacity of VoIP services over evolved UTRA uplink. On top of the advantages of persistent scheduling, the proposed scheme adaptively share the resources of two VoIP users to get early-termination gain of dynamic scheduler. Through system-level simulations, the performance of the proposed algorithm is evaluated in terms of the capacity enhancement of VoIP services. Comparisons with the original persistent scheduling and the HSUPA scheduler reveal that the proposed scheme increases the capacity of VoIP services up to 20%.

  3. Scheduling Spitzer: The SIRPASS Story

    Science.gov (United States)

    Mittman, David S.; Hawkins, Robert

    2013-01-01

    NASA's Spitzer Space Telescope was launched on August 25, 2003 from Florida's Cape Canaveral Air Force Base. Drifting in a unique Earth-trailing orbit around the Sun, Spitzer sees an optically invisible universe dominated by dust and stars. Since 1997, the Spitzer Integrated Resource Planning and Scheduling System (SIRPASS) has helped produce spacecraft activity plans for the Spitzer Space Telescope. SIRPASS is used by members of the Observatory Planning and Scheduling Team to plan, schedule and sequence the Telescope from data made available to them from the science and engineering community. Because of the volume of data that needs to be scheduled, SIRPASS offers a variety of automated assistants to aid in this task. This paper will describe the functional elements of the SIRPASS software system -- emphasizing the role that automation plays in the system -- and will highlight lessons learned for the software developer from a decade of Spitzer Space Telescope operations experience.

  4. Executive Schedule C System (ESCS)

    Data.gov (United States)

    Office of Personnel Management — Used to store information on Federal employees in the Senior Executive Service (SES) and appointed employees in the Schedule C System. Every four years, just after...

  5. Schedule Sales Query Raw Data

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  6. Multiagent scheduling models and algorithms

    CERN Document Server

    Agnetis, Alessandro; Gawiejnowicz, Stanisław; Pacciarelli, Dario; Soukhal, Ameur

    2014-01-01

    This book presents multi-agent scheduling models in which subsets of jobs sharing the same resources are evaluated by different criteria. It discusses complexity results, approximation schemes, heuristics and exact algorithms.

  7. Fundamentals of Shiftwork Scheduling

    National Research Council Canada - National Science Library

    Miller, James C

    2006-01-01

    ..., assessment tools and examples. Subjects discussed include fatigue, safety, calendar arithmetic, circadian stability, the Principles of Chronohygiene, shiftwork satisfaction, the numbers of workers needed, the basic structure...

  8. Future aircraft networks and schedules

    Science.gov (United States)

    Shu, Yan

    2011-07-01

    Because of the importance of air transportation scheduling, the emergence of small aircraft and the vision of future fuel-efficient aircraft, this thesis has focused on the study of aircraft scheduling and network design involving multiple types of aircraft and flight services. It develops models and solution algorithms for the schedule design problem and analyzes the computational results. First, based on the current development of small aircraft and on-demand flight services, this thesis expands a business model for integrating on-demand flight services with the traditional scheduled flight services. This thesis proposes a three-step approach to the design of aircraft schedules and networks from scratch under the model. In the first step, both a frequency assignment model for scheduled flights that incorporates a passenger path choice model and a frequency assignment model for on-demand flights that incorporates a passenger mode choice model are created. In the second step, a rough fleet assignment model that determines a set of flight legs, each of which is assigned an aircraft type and a rough departure time is constructed. In the third step, a timetable model that determines an exact departure time for each flight leg is developed. Based on the models proposed in the three steps, this thesis creates schedule design instances that involve almost all the major airports and markets in the United States. The instances of the frequency assignment model created in this thesis are large-scale non-convex mixed-integer programming problems, and this dissertation develops an overall network structure and proposes iterative algorithms for solving these instances. The instances of both the rough fleet assignment model and the timetable model created in this thesis are large-scale mixed-integer programming problems, and this dissertation develops subproblem schemes for solving these instances. Based on these solution algorithms, this dissertation also presents

  9. Digital automatic gain amplifier

    Science.gov (United States)

    Holley, L. D.; Ward, J. O. (Inventor)

    1978-01-01

    A circuit is described for adjusting the amplitude of a reference signal to a predetermined level so as to permit subsequent data signals to be interpreted correctly. The circuit includes an operational amplifier having a feedback circuit connected between an output terminal and an input terminal; a bank of relays operably connected to a plurality of resistors; and a comparator comparing an output voltage of the amplifier with a reference voltage and generating a compared signal responsive thereto. Means is provided for selectively energizing the relays according to the compared signal from the comparator until the output signal from the amplifier equals to the reference signal. A second comparator is provided for comparing the output of the amplifier with a second voltage source so as to illuminate a lamp when the output signal from the amplifier exceeds the second voltage.

  10. Artificial intelligence for the CTA Observatory scheduler

    Science.gov (United States)

    Colomé, Josep; Colomer, Pau; Campreciós, Jordi; Coiffard, Thierry; de Oña, Emma; Pedaletti, Giovanna; Torres, Diego F.; Garcia-Piquer, Alvaro

    2014-08-01

    The Cherenkov Telescope Array (CTA) project will be the next generation ground-based very high energy gamma-ray instrument. The success of the precursor projects (i.e., HESS, MAGIC, VERITAS) motivated the construction of this large infrastructure that is included in the roadmap of the ESFRI projects since 2008. CTA is planned to start the construction phase in 2015 and will consist of two arrays of Cherenkov telescopes operated as a proposal-driven open observatory. Two sites are foreseen at the southern and northern hemispheres. The CTA observatory will handle several observation modes and will have to operate tens of telescopes with a highly efficient and reliable control. Thus, the CTA planning tool is a key element in the control layer for the optimization of the observatory time. The main purpose of the scheduler for CTA is the allocation of multiple tasks to one single array or to multiple sub-arrays of telescopes, while maximizing the scientific return of the facility and minimizing the operational costs. The scheduler considers long- and short-term varying conditions to optimize the prioritization of tasks. A short-term scheduler provides the system with the capability to adapt, in almost real-time, the selected task to the varying execution constraints (i.e., Targets of Opportunity, health or status of the system components, environment conditions). The scheduling procedure ensures that long-term planning decisions are correctly transferred to the short-term prioritization process for a suitable selection of the next task to execute on the array. In this contribution we present the constraints to CTA task scheduling that helped classifying it as a Flexible Job-Shop Problem case and finding its optimal solution based on Artificial Intelligence techniques. We describe the scheduler prototype that uses a Guarded Discrete Stochastic Neural Network (GDSN), for an easy representation of the possible long- and short-term planning solutions, and Constraint

  11. Hanford Site Environmental Surveillance Master Sampling Schedule, January 2001

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2001-01-08

    This document contains the CY 2001 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed.

  12. Construction schedules slack time minimizing

    Science.gov (United States)

    Krzemiński, Michał

    2017-07-01

    The article presents two copyright models for minimizing downtime working brigades. Models have been developed for construction schedules performed using the method of work uniform. Application of flow shop models is possible and useful for the implementation of large objects, which can be divided into plots. The article also presents a condition describing gives which model should be used, as well as a brief example of optimization schedule. The optimization results confirm the legitimacy of the work on the newly-developed models.

  13. Workload Schedulers - Genesis, Algorithms and Comparisons

    OpenAIRE

    Sliwko, L.; Getov, Vladimir

    2015-01-01

    In this article we provide brief descriptions of three classes of schedulers: Operating Systems Process Schedulers, Cluster Systems, Jobs Schedulers and Big Data Schedulers. We describe their evolution from early adoptions to modern implementations, considering both the use and features of algorithms. In summary, we discuss differences between all presented classes of schedulers and discuss their chronological development. In conclusion, we highlight similarities in the focus of scheduling st...

  14. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  15. Underground storage tank - Integrated Demonstration Technical Task Plan master schedule

    International Nuclear Information System (INIS)

    Johnson, C.M.

    1994-08-01

    This document provides an integrated programmatic schedule (i.e., Master Schedule) for the U.S. Department of Energy (DOE) Underground Storage Tank-Integrated Demonstration (UST-ID) Program. It includes top-level schedule and related information for the DOE Office of Technology Development (EM-50) UST-ID activities. The information is based upon the fiscal year (FY) 1994 technical task plans (TTPS) and has been prepared as a baseline information resource for program participants. The Master Schedule contains Level 0 and Level 1 program schedules for the UST-ID Program. This document is one of a number of programmatic documents developed to support and manage the UST-ID activities. It is composed of the following sections: Program Overview - provides a summary background of the UST-ID Program. This summary addresses the mission, scope, and organizational structure of the program; Activity Description - provides a programmatic description of UST-ID technology development activities and lists the key milestones for the UST-ID systems. Master Schedules - contains the Level 0 and Level 1 programmatic schedules for the UST-ID systems. References - lists the UST-ID programmatic documents used as a basis for preparing the Master Schedule. The appendixes contain additional details related to site-specific technology applications

  16. Non-clairvoyant Scheduling Games

    Science.gov (United States)

    Dürr, Christoph; Nguyen, Kim Thang

    In a scheduling game, each player owns a job and chooses a machine to execute it. While the social cost is the maximal load over all machines (makespan), the cost (disutility) of each player is the completion time of its own job. In the game, players may follow selfish strategies to optimize their cost and therefore their behaviors do not necessarily lead the game to an equilibrium. Even in the case there is an equilibrium, its makespan might be much larger than the social optimum, and this inefficiency is measured by the price of anarchy - the worst ratio between the makespan of an equilibrium and the optimum. Coordination mechanisms aim to reduce the price of anarchy by designing scheduling policies that specify how jobs assigned to a same machine are to be scheduled. Typically these policies define the schedule according to the processing times as announced by the jobs. One could wonder if there are policies that do not require this knowledge, and still provide a good price of anarchy. This would make the processing times be private information and avoid the problem of truthfulness. In this paper we study these so-called non-clairvoyant policies. In particular, we study the RANDOM policy that schedules the jobs in a random order without preemption, and the EQUI policy that schedules the jobs in parallel using time-multiplexing, assigning each job an equal fraction of CPU time.

  17. Resource-Optimal Scheduling Using Priced Timed Automata

    DEFF Research Database (Denmark)

    Larsen, Kim Guldstrand; Rasmussen, Jacob Illum; Subramani, K.

    2004-01-01

    In this paper, we show how the simple structure of the linear programs encountered during symbolic minimum-cost reachability analysis of priced timed automata can be exploited in order to substantially improve the performance of the current algorithm. The idea is rooted in duality of linear progr......-80 percent performance gain. As a main application area, we show how to solve energy-optimal task graph scheduling problems using the framework of priced timed automata....

  18. High Gain Advanced GPS Receiver

    National Research Council Canada - National Science Library

    Brown, Alison; Zhang, Gengsheng

    2006-01-01

    NAVSYS High Gain Advanced GPS Receiver (HAGR) uses a digital beam-steering antenna array to enable up to eight GPS satellites to be tracked, each with up to 10 dBi of additional antenna gain over a conventional receiver solution...

  19. How to gain gain a reference book on triodes in audio pre-amps

    CERN Document Server

    Vogel, Burkhard

    2013-01-01

    The 34 chapters of the 2nd edition of How to Gain Gain give a detailed insight into a collection (54) of the most common gain producing, constant current generating possibilities, and electronic noise creation of triodes for audio pre-amplifier purposes. These chapters also offer complete sets of formulae to calculate gain, frequency and phase responses, and signal-to-noise ratios of certain building blocks built-up with this type of vacuum valve (tube). In all cases detailed derivations of the gain formulae are also presented. All what is needed are the data sheet valve characteristic figures of the triode's mutual conductance, the gain factor and the internal plate (anode) resistance. To calculate frequency and phase responses of gain stages the different data sheet based input and output capacitances have to be taken into account too. To calculate transfer functions and signal-to-noise ratios for any kind of triode driven gain stage, including all its bias setting, frequency, phase, and electronic noise in...

  20. 77 FR 6466 - Schedule for Rating Disabilities; AL Amyloidosis (Primary Amyloidosis)

    Science.gov (United States)

    2012-02-08

    ... DEPARTMENT OF VETERANS AFFAIRS 38 CFR Part 4 RIN 2900-AN75 Schedule for Rating Disabilities; AL... Department of Veterans Affairs (VA) is amending its Schedule for Rating Disabilities by updating the schedule of ratings for the hemic and lymphatic systems to include AL amyloidosis. This regulatory action is...

  1. Space station program phase B definition: Nuclear reactor-powered space station cost and schedules

    Science.gov (United States)

    1971-01-01

    Tabulated data are presented on the costs, schedules, and technical characteristics for the space station phases C and D program. The work breakdown structure, schedule data, program ground rules, program costs, cost-estimating rationale, funding schedules, and supporting data are included.

  2. The Savannah River Site`s groundwater monitoring program: 1990 sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, C.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1991-02-07

    This schedule provides a final record of the 1990 sampling schedule for the SRS groundwater monitoring program conducted by the Environmental Protection Department/Environmental Section (EPD/EMS). It includes all the wells monitored by EPD/EMS at SRS during 1990 and identifies the constituents sampled, the sampling frequency, and the reasons for sampling. Sampling requests are incorporated into the schedule throughout the year. Drafts of the schedule are produced and revised quarterly.

  3. Nature's loss, Immunologists gain?

    Science.gov (United States)

    Aluvihare

    2000-01-01

    a well-chosen selection of recent articles in the primary literature written by the three editors. These struck me as striking slightly too jokey a style. It is a terrible temptation and mistake in this kind of piece, I think, to equate lightheartedness with clarity. The sugar coating is more likely to irritate than enlighten. I would also question the wisdom, if it is indeed a policy, of only allowing editors to write in this section. I'm all for experienced writers writing, but I think I would prefer the variety of voice and authority evinced by the parental Nature News and Views. After the main reviews comes a section entitled 'perspectives', which include a 'Timeline' piece on Hayflick and his limit by Jerry Shay and Woodring Wright that I very much enjoyed, and a review (or Opinion) about cancer from Judah Folkman, Philip Hahnfeldt and Lynn Hlatky. In their own words, "the impetus for this Opinion article centres on the increasing awareness of the heterogeneity and instability of the cancer genome [. I]t is possible that suppressing this degenerative process may itself comprise an alternative constraint-based paradigm." The authors' fondness for portentous phrases of this kind rather spoiled their discussion for me. I also had trouble with an article on molecular computing. PCR reactions can solve the travelling salesman problem, it seems, but extremely slowly compared to a proper computer. The magazine has a nice heft to it, and is attractively designed and presented in glossy colour, although the main font is small enough to make reading difficult for your middle-aged reviewer in a particularly heavily overcast and rainy week in London. A first issue is supposed to be a kind of showcase, but if they can keep this up, the editors will surely have a success on their hands and you will probably be obliged to take out a personal subscription (£85), or persuade your library to part with £565. That's slightly cheaper than TiBS and a lot cheaper than Current

  4. The Offering, Scheduling and Maintenance of Elective Advanced Pharmacy Practice Experiences

    Directory of Open Access Journals (Sweden)

    Rex O. Brown

    2015-12-01

    Full Text Available The Accreditation Council for Pharmacy Education (ACPE provides standards for colleges of pharmacy to assist in the provision of pharmacy education to student pharmacists. An integral part of all college educational programs includes the provision of experiential learning. Experiential learning allows students to gain real-world experience in direct patient care during completion of the curriculum. All college of pharmacy programs provide several Advanced Pharmacy Practice Experiences (APPEs, which include a balance between the four required experiences and a number of other required or elective APPEs. Required APPEs include advanced community, advanced institutional, ambulatory care, and general medicine. The elective APPEs include a myriad of opportunities to help provide a balanced education in experiential learning for student pharmacists. These unique opportunities help to expose student pharmacists to different career tracks that they may not have been able to experience otherwise. Not all colleges offer enough elective APPEs to enable the student pharmacist to obtain experiences in a defined area. Such an approach is required to produce skilled pharmacy graduates that are capable to enter practice in various settings. Elective APPEs are scheduled logically and are based upon student career interest and site availability. This article describes the offering, scheduling and maintenance of different elective APPEs offered by The University of Tennessee College of Pharmacy.

  5. Automated Long - Term Scheduling for the SOFIA Airborne Observatory

    Science.gov (United States)

    Civeit, Thomas

    2013-01-01

    The NASA Stratospheric Observatory for Infrared Astronomy (SOFIA) is a joint US/German project to develop and operate a gyro-stabilized 2.5-meter telescope in a Boeing 747SP. SOFIA's first science observations were made in December 2010. During 2011, SOFIA accomplished 30 flights in the "Early Science" program as well as a deployment to Germany. The new observing period, known as Cycle 1, is scheduled to begin in 2012. It includes 46 science flights grouped in four multi-week observing campaigns spread through a 13-month span. Automation of the flight scheduling process offers a major challenge to the SOFIA mission operations. First because it is needed to mitigate its relatively high cost per unit observing time compared to space-borne missions. Second because automated scheduling techniques available for ground-based and space-based telescopes are inappropriate for an airborne observatory. Although serious attempts have been made in the past to solve part of the problem, until recently mission operations staff was still manually scheduling flights. We present in this paper a new automated solution for generating SOFIA long-term schedules that will be used in operations from the Cycle 1 observing period. We describe the constraints that should be satisfied to solve the SOFIA scheduling problem in the context of real operations. We establish key formulas required to efficiently calculate the aircraft course over ground when evaluating flight schedules. We describe the foundations of the SOFIA long-term scheduler, the constraint representation, and the random search based algorithm that generates observation and instrument schedules. Finally, we report on how the new long-term scheduler has been used in operations to date.

  6. Sharing data for production scheduling using the ISA-95 standard

    Directory of Open Access Journals (Sweden)

    Iiro eHarjunkoski

    2014-10-01

    Full Text Available In the development and deployment of production scheduling solutions one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment and other resources are necessary for producing a realistic short-term production plan. Currently, a widely-accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data-exchange for scheduling solutions.

  7. Sharing Data for Production Scheduling Using the ISA-95 Standard

    International Nuclear Information System (INIS)

    Harjunkoski, Iiro; Bauer, Reinhard

    2014-01-01

    In the development and deployment of production scheduling solutions, one major challenge is to establish efficient information sharing with industrial production management systems. Information comprising production orders to be scheduled, processing plant structure, product recipes, available equipment, and other resources are necessary for producing a realistic short-term production plan. Currently, a widely accepted standard for information sharing is missing. This often leads to the implementation of costly custom-tailored interfaces, or in the worst case the scheduling solution will be abandoned. Additionally, it becomes difficult to easily compare different methods on various problem instances, which complicates the re-use of existing scheduling solutions. In order to overcome these hurdles, a platform-independent and holistic approach is needed. Nevertheless, it is difficult for any new solution to gain wide acceptance within industry as new standards are often refused by companies already using a different established interface. From an acceptance point of view, the ISA-95 standard could act as a neutral data-exchange platform. In this paper, we assess if this already widespread standard is simple, yet powerful enough to act as the desired holistic data exchange for scheduling solutions.

  8. Hanford site environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1998-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1 open-quotes General Environmental Protection Program,close quotes and DOE Order 5400.5, open-quotes Radiation Protection of the Public and the Environment.close quotes The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 2, U.S. Department of Energy, Richland, Washington. This document contains the 1998 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section of this document describes the planned sampling schedule for a specific media (air, surface water, biota, soil and vegetation, sediment, and external radiation). Each section includes the sample location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be planned for 1998 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing sample locations

  9. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    2000-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program: and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling design is described in the Operations Office, Environmental Monitoring Plan, United States Department of Energy, Richland DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY 2000 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2000 in which case the anticipated year for collection is provided. In addition, a map showing approximate sampling locations is included for each media scheduled for collection

  10. Scheduling of resource-constrained projects

    CERN Document Server

    Klein, Robert

    2000-01-01

    Project management has become a widespread instrument enabling organizations to efficiently master the challenges of steadily shortening product life cycles, global markets and decreasing profit margins. With projects increasing in size and complexity, their planning and control represents one of the most crucial management tasks. This is especially true for scheduling, which is concerned with establishing execution dates for the sub-activities to be performed in order to complete the project. The ability to manage projects where resources must be allocated between concurrent projects or even sub-activities of a single project requires the use of commercial project management software packages. However, the results yielded by the solution procedures included are often rather unsatisfactory. Scheduling of Resource-Constrained Projects develops more efficient procedures, which can easily be integrated into software packages by incorporated programming languages, and thus should be of great interest for practiti...

  11. Multitasking Scheduling Problems with Deterioration Effect

    Directory of Open Access Journals (Sweden)

    Zhanguo Zhu

    2017-01-01

    Full Text Available Multitasking scheduling problems with a deterioration effect incurred by coexisting behavioral phenomena in human-related scheduling systems including deteriorating task processing times and deteriorating rate-modifying activity (DRMA of human operators are addressed. Under the assumption of this problem, the processing of a selected task suffers from the joint effect of available but unfinished waiting tasks, the position-dependent deterioration of task processing time, and the DRMA of human operators. Traditionally, these issues have been considered separately; herein, we address their integration. We propose optimal algorithms to solve the problems to minimize makespan and the total absolute differences in completion time, respectively. Based on the analysis, some special cases and extensions are also discussed.

  12. Net Photorefractive Gain In Gallium Arsenide

    Science.gov (United States)

    Liu, Tsuen-Hsi; Cheng, Li-Jen

    1990-01-01

    Prerequisite includes applied electric field. Electric field applied to GaAs crystal in which two infrared beams interfere. Depending on quality of sample and experimental conditions, net photorefractive gain obtained. Results offer possibility of new developments in real-time optical processing of signals by use of near-infrared lasers of low power.

  13. Automatic Choice of Scheduling Heuristics for Parallel/Distributed Computing

    Directory of Open Access Journals (Sweden)

    Clayton S. Ferner

    1999-01-01

    Full Text Available Task mapping and scheduling are two very difficult problems that must be addressed when a sequential program is transformed into a parallel program. Since these problems are NP‐hard, compiler writers have opted to concentrate their efforts on optimizations that produce immediate gains in performance. As a result, current parallelizing compilers either use very simple methods to deal with task scheduling or they simply ignore it altogether. Unfortunately, the programmer does not have this luxury. The burden of repartitioning or rescheduling, should the compiler produce inefficient parallel code, lies entirely with the programmer. We were able to create an algorithm (called a metaheuristic, which automatically chooses a scheduling heuristic for each input program. The metaheuristic produces better schedules in general than the heuristics upon which it is based. This technique was tested on a suite of real scientific programs written in SISAL and simulated on four different network configurations. Averaged over all of the test cases, the metaheuristic out‐performed all eight underlying scheduling algorithms; beating the best one by 2%, 12%, 13%, and 3% on the four separate network configurations. It is able to do this, not always by picking the best heuristic, but rather by avoiding the heuristics when they would produce very poor schedules. For example, while the metaheuristic only picked the best algorithm about 50% of the time for the 100 Gbps Ethernet, its worst decision was only 49% away from optimal. In contrast, the best of the eight scheduling algorithms was optimal 30% of the time, but its worst decision was 844% away from optimal.

  14. NRC comprehensive records disposition schedule

    International Nuclear Information System (INIS)

    1983-05-01

    Effective January 1, 1982, NRC will institute records retention and disposal practives in accordance with the approved Comprehensive Records Disposition Schedule (CRDS). CRDS is comprised of NRC Schedules (NRCS) 1 to 4 which apply to the agency's program or substantive records and General Records Schedules (GRS) 1 to 24 which apply to housekeeping or facilitative records. NRCS-I applies to records common to all or most NRC offices; NRCS-II applies to program records as found in the various offices of the Commission, Atomic Safety and Licensing Board Panel, and the Atomic Safety and Licensing Appeal Panel; NRCS-III applies to records accumulated by the Advisory Committee on Reactor Safeguards; and NRCS-IV applies to records accumulated in the various NRC offices under the Executive Director for Operations. The schedules are assembled functionally/organizationally to facilitate their use. Preceding the records descriptions and disposition instructions for both NRCS and GRS, there are brief statements on the organizational units which accumulate the records in each functional area, and other information regarding the schedules' applicability

  15. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons

  16. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1991-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Ground-Water Monitoring Project. The routine sampling plan for the SESP has been revised this year to reflect changing site operations and priorities. Some sampling previously performed at least annually has been reduced in frequency, and some new sampling to be performed at a less than annual frequency has been added. Therefore, the SESP schedule reflects sampling to be conducted in calendar year 1991 as well as future years. The ground-water sampling schedule is for 1991. This schedule is subject to modification during the year in response to changes in Site operation, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford evirons.

  17. Adapting immunisation schedules for children undergoing chemotherapy.

    Science.gov (United States)

    Fernández-Prada, María; Rodríguez-Martínez, María; García-García, Rebeca; García-Corte, María Dolores; Martínez-Ortega, Carmen

    2018-02-01

    Children undergoing chemotherapy for cancer have special vaccination needs after completion of the treatment. The aim of this study was to evaluate the adaptation of post-chemotherapy vaccination schedules. An observational study was performed on a retrospective cohort that included all children aged from 0 to 14 years, who completed chemotherapy in a tertiary hospital between 2009 and 2015. Inclusion and exclusion criteria were applied. Immunisation was administered in accordance with the guidelines of the Vaccine Advisory Committee of the Spanish Association of Paediatrics. Primary Care immunisation and clinical records of the Preventive Medicine and Public Health Department were reviewed. Of the 99 children who had received chemotherapy, 51 (70.6% males) were included in the study. As regards the type of tumour, 54.9% had a solid organ tumour, and 45.1% had a haematological tumour. Post-chemotherapy immunisation was administered to 70.6%. The most common vaccines received were: diphtheria-tetanus-pertussis or diphtheria-tetanus (54.9%), meningococcus C (41.2%), and seasonal influenza (39.2%). The rate of adaptation of the immunisation schedule after chemotherapy was 9.8%. The pneumococcal conjugate vaccine against 7v or 13v was administered to 21.6% of study subjects. However, only 17.6% received polysaccharide 23v. None received vaccination against hepatitis A. No statistically significant differences were observed between adherence to immunisation schedules and type of tumour (P=.066), gender (P=.304), or age (P=.342). Post-chemotherapy immunisation of children with cancer is poor. The participation of health professionals in training programs and referral of paediatric cancer patients to Vaccine Units could improve the rate of schedule adaptation and proper immunisation of this population. Copyright © 2016 Elsevier España, S.L.U. and Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  18. Improving the efficiency of patient throughput via centralized inpatient scheduling.

    Science.gov (United States)

    Steffen, Mark W

    2010-01-01

    Advocate Illinois Masonic Medical Center implemented a centralized scheduling system in order to increase efficiency and throughput, improve customer satisfaction, improve communication between departments,and create a single schedule (IP/ED/OP) per modality. Most resistance for the change came from technologists, so a formal design team was established for each modality, which included a core information systems (IS) team member,the lead technologist of the modality, and the technologist most able to influence the other technologists who might be resistant to change. Overall,throughput increased by 3.14% post-implementation of the inpatient scheduling software.

  19. Gain and Index Dynamics in Semiconductor Lasers

    DEFF Research Database (Denmark)

    Hvam, Jørn Märcher

    changed character from bulk semiconductor to quantum wells and most recently to quantum dots. By quantum confinement of the carriers, the light-matter interactions can be significantly modified and the optical properties, including dynamics, can be engineered to match the required functionalities...... and specifications. We have measured ultrafast gain and index dynamics of SOAs in pump-and-probe experiments applying 100 fs pulses and a heterodyne detection scheme, where both amplitude and phase of the probe pulses are determined. The gain depletion, and associated index change, and the subsequent recovery afte...

  20. Thermal-Aware Scheduling for Future Chip Multiprocessors

    Directory of Open Access Journals (Sweden)

    Pedro Trancoso

    2007-04-01

    Full Text Available The increased complexity and operating frequency in current single chip microprocessors is resulting in a decrease in the performance improvements. Consequently, major manufacturers offer chip multiprocessor (CMP architectures in order to keep up with the expected performance gains. This architecture is successfully being introduced in many markets including that of the embedded systems. Nevertheless, the integration of several cores onto the same chip may lead to increased heat dissipation and consequently additional costs for cooling, higher power consumption, decrease of the reliability, and thermal-induced performance loss, among others. In this paper, we analyze the evolution of the thermal issues for the future chip multiprocessor architectures and show that as the number of on-chip cores increases, the thermal-induced problems will worsen. In addition, we present several scenarios that result in excessive thermal stress to the CMP chip or significant performance loss. In order to minimize or even eliminate these problems, we propose thermal-aware scheduler (TAS algorithms. When assigning processes to cores, TAS takes their temperature and cooling ability into account in order to avoid thermal stress and at the same time improve the performance. Experimental results have shown that a TAS algorithm that considers also the temperatures of neighboring cores is able to significantly reduce the temperature-induced performance loss while at the same time, decrease the chip's temperature across many different operation and configuration scenarios.

  1. Recommended immunization schedule for children and adolescents: the Korean Pediatric Society, 2013

    Directory of Open Access Journals (Sweden)

    Dae Sun Jo

    2013-06-01

    Full Text Available This article contains the recommended immunization schedule by the Committee on Infectious Diseases of the Korean Pediatric Society, updated in March 2013, when Haemophilus influenzae type b vaccine is now included in the National Immunization Program in Korea. It also includes catchup immunization schedule for children and adolescents who are behind the recommended schedule. These schedules are a minor revision of the corresponding parts of Immunization Guideline, 7th edition, of the Korean Pediatric Society, released in 2012. Pediatricians should be aware of these schedules to provide adequate immunization to Korean children and adolescents.

  2. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1997-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL)(a) for the US Department of Energy (DOE). This document contains the planned 1997 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. In addition, Section 3.0, Biota, also reflects a rotating collection schedule identifying the year a specific sample is scheduled for collection. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, General Environmental Protection Program, and DOE Order 5400.5, Radiation Protection of the Public and the Environment. The sampling methods will be the same as those described in the Environmental Monitoring Plan, US Department of Energy, Richland Operations Office, DOE/RL91-50, Rev. 1, US Department of Energy, Richland, Washington

  3. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Søndergaard, Hans

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way....

  4. Optimal randomized scheduling by replacement

    Energy Technology Data Exchange (ETDEWEB)

    Saias, I.

    1996-05-01

    In the replacement scheduling problem, a system is composed of n processors drawn from a pool of p. The processors can become faulty while in operation and faulty processors never recover. A report is issued whenever a fault occurs. This report states only the existence of a fault but does not indicate its location. Based on this report, the scheduler can reconfigure the system and choose another set of n processors. The system operates satisfactorily as long as, upon report of a fault, the scheduler chooses n non-faulty processors. We provide a randomized protocol maximizing the expected number of faults the system can sustain before the occurrence of a crash. The optimality of the protocol is established by considering a closely related dual optimization problem. The game-theoretic technical difficulties that we solve in this paper are very general and encountered whenever proving the optimality of a randomized algorithm in parallel and distributed computation.

  5. Schedulability Analysis for Java Finalizers

    DEFF Research Database (Denmark)

    Bøgholm, Thomas; Hansen, Rene Rydhof; Ravn, Anders P.

    2010-01-01

    Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact ...... programs. Finally, we extend the SARTS tool for automated schedulability analysis of Java bytecode programs to handle finalizers in a fully automated way.......Java finalizers perform clean-up and finalisation of objects at garbage collection time. In real-time Java profiles the use of finalizers is either discouraged (RTSJ, Ravenscar Java) or even disallowed (JSR-302), mainly because of the unpredictability of finalizers and in particular their impact...... on the schedulability analysis. In this paper we show that a controlled scoped memory model results in a structured and predictable execution of finalizers, more reminiscent of C++ destructors than Java finalizers. Furthermore, we incorporate finalizers into a (conservative) schedulability analysis for Predictable Java...

  6. Come On! Using intervention mapping to help healthy pregnant women achieve healthy weight gain.

    Science.gov (United States)

    Merkx, Astrid; Ausems, Marlein; de Vries, Raymond; Nieuwenhuijze, Marianne J

    2017-06-01

    Gaining too much or too little weight in pregnancy (according to Institute of Medicine (IOM) guidelines) negatively affects both mother and child, but many women find it difficult to manage their gestational weight gain (GWG). Here we describe the use of the intervention mapping protocol to design 'Come On!', an intervention to promote adequate GWG among healthy pregnant women. We used the six steps of intervention mapping: (i) needs assessment; (ii) formulation of change objectives; (iii) selection of theory-based methods and practical strategies; (iv) development of the intervention programme; (v) development of an adoption and implementation plan; and (vi) development of an evaluation plan. A consortium of users and related professionals guided the process of development. As a result of the needs assessment, two goals for the intervention were formulated: (i) helping healthy pregnant women to stay within the IOM guidelines for GWG; and (ii) getting midwives to adequately support the efforts of healthy pregnant women to gain weight within the IOM guidelines. To reach these goals, change objectives and determinants influencing the change objectives were formulated. Theories used were the Transtheoretical Model, Social Cognitive Theory and the Elaboration Likelihood Model. Practical strategies to use the theories were the foundation for the development of 'Come On!', a comprehensive programme that included a tailored Internet programme for pregnant women, training for midwives, an information card for midwives, and a scheduled discussion between the midwife and the pregnant woman during pregnancy. The programme was pre-tested and evaluated in an effect study.

  7. Diversity Gain through Antenna Blocking

    Directory of Open Access Journals (Sweden)

    V. Dehghanian

    2012-01-01

    Full Text Available As part of the typical usage mode, interaction between a handheld receiver antenna and the operator's RF absorbing body and nearby objects is known to generate variability in antenna radiation characteristics through blocking and pattern changes. It is counterintuitive that random variations in blocking can result in diversity gain of practical applicability. This diversity gain is quantified from a theoretical and experimental perspective. Measurements carried out at 1947.5 MHz verify the theoretical predictions, and a diversity gain of 3.1 dB was measured through antenna blocking and based on the utilized measurement setup. The diversity gain can be exploited to enhance signal detectability of handheld receivers based on a single antenna in indoor multipath environments.

  8. Alternative schedules of levothyroxine administration.

    Science.gov (United States)

    Geer, Melanie; Potter, Donald Mark; Ulrich, Heather

    2015-03-01

    Published evidence on bedtime versus prebreakfast administration of levothyroxine is reviewed. Because levothyroxine absorption has been shown to increase when the drug is administered to patients in a fasted state, the standard recommendation is that levothyroxine be taken one half to one hour prior to breakfast and at least four hours before or after potentially interacting drugs. However, compliance with this recommendation may be problematic for patients with unpredictable or variable schedules. A literature search identified four published studies of bedtime levothyroxine dosing. Two of the studies demonstrated a significant decrease in levels of thyroid-stimulating hormone (TSH) with levothyroxine administration at bedtime versus 30 minutes before breakfast, one study showed an increase in TSH when levothyroxine was taken at bedtime versus one hour before breakfast, and one study found no significant differences in TSH levels or other thyroid function monitoring limitations with bedtime versus standard dosing in subjects naive to levothyroxine therapy. The inconsistent study findings may be attributable to a number of variables, including dietary differences among the study populations, the use of potentially interacting supplements in one study, and variable intervals between levothyroxine administration and food intake. Neither dosing method correlated with substantial changes in assessments of quality of life or symptom severity; in two of the studies, patients indicated a preference for bedtime levothyroxine administration. Based on the available literature, bedtime administration of levothyroxine is an option for patients with hypothyroidism who want to avoid taking their medication with food. Copyright © 2015 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  9. Flow-shop scheduling problem under uncertainties: Review and trends

    Directory of Open Access Journals (Sweden)

    Eliana María González-Neira

    2017-03-01

    Full Text Available Among the different tasks in production logistics, job scheduling is one of the most important at the operational decision-making level to enable organizations to achieve competiveness. Scheduling consists in the allocation of limited resources to activities over time in order to achieve one or more optimization objectives. Flow-shop (FS scheduling problems encompass the sequencing processes in environments in which the activities or operations are performed in a serial flow. This type of configuration includes assembly lines and the chemical, electronic, food, and metallurgical industries, among others. Scheduling has been mostly investigated for the deterministic cases, in which all parameters are known in advance and do not vary over time. Nevertheless, in real-world situations, events are frequently subject to uncertainties that can affect the decision-making process. Thus, it is important to study scheduling and sequencing activities under uncertainties since they can cause infeasibilities and disturbances. The purpose of this paper is to provide a general overview of the FS scheduling problem under uncertainties and its role in production logistics and to draw up opportunities for further research. To this end, 100 papers about FS and flexible flow-shop scheduling problems published from 2001 to October 2016 were analyzed and classified. Trends in the reviewed literature are presented and finally some research opportunities in the field are proposed.

  10. Artificial intelligence approaches to astronomical observation scheduling

    Science.gov (United States)

    Johnston, Mark D.; Miller, Glenn

    1988-01-01

    Automated scheduling will play an increasing role in future ground- and space-based observatory operations. Due to the complexity of the problem, artificial intelligence technology currently offers the greatest potential for the development of scheduling tools with sufficient power and flexibility to handle realistic scheduling situations. Summarized here are the main features of the observatory scheduling problem, how artificial intelligence (AI) techniques can be applied, and recent progress in AI scheduling for Hubble Space Telescope.

  11. Developmental gains in visuospatial memory predict gains in mathematics achievement.

    Directory of Open Access Journals (Sweden)

    Yaoran Li

    Full Text Available Visuospatial competencies are related to performance in mathematical domains in adulthood, but are not consistently related to mathematics achievement in children. We confirmed the latter for first graders and demonstrated that children who show above average first-to-fifth grade gains in visuospatial memory have an advantage over other children in mathematics. The study involved the assessment of the mathematics and reading achievement of 177 children in kindergarten to fifth grade, inclusive, and their working memory capacity and processing speed in first and fifth grade. Intelligence was assessed in first grade and their second to fourth grade teachers reported on their in-class attentive behavior. Developmental gains in visuospatial memory span (d = 2.4 were larger than gains in the capacity of the central executive (d = 1.6 that in turn were larger than gains in phonological memory span (d = 1.1. First to fifth grade gains in visuospatial memory and in speed of numeral processing predicted end of fifth grade mathematics achievement, as did first grade central executive scores, intelligence, and in-class attentive behavior. The results suggest there are important individual differences in the rate of growth of visuospatial memory during childhood and that these differences become increasingly important for mathematics learning.

  12. Developmental gains in visuospatial memory predict gains in mathematics achievement.

    Science.gov (United States)

    Li, Yaoran; Geary, David C

    2013-01-01

    Visuospatial competencies are related to performance in mathematical domains in adulthood, but are not consistently related to mathematics achievement in children. We confirmed the latter for first graders and demonstrated that children who show above average first-to-fifth grade gains in visuospatial memory have an advantage over other children in mathematics. The study involved the assessment of the mathematics and reading achievement of 177 children in kindergarten to fifth grade, inclusive, and their working memory capacity and processing speed in first and fifth grade. Intelligence was assessed in first grade and their second to fourth grade teachers reported on their in-class attentive behavior. Developmental gains in visuospatial memory span (d = 2.4) were larger than gains in the capacity of the central executive (d = 1.6) that in turn were larger than gains in phonological memory span (d = 1.1). First to fifth grade gains in visuospatial memory and in speed of numeral processing predicted end of fifth grade mathematics achievement, as did first grade central executive scores, intelligence, and in-class attentive behavior. The results suggest there are important individual differences in the rate of growth of visuospatial memory during childhood and that these differences become increasingly important for mathematics learning.

  13. Developmental Gains in Visuospatial Memory Predict Gains in Mathematics Achievement

    Science.gov (United States)

    Li, Yaoran; Geary, David C.

    2013-01-01

    Visuospatial competencies are related to performance in mathematical domains in adulthood, but are not consistently related to mathematics achievement in children. We confirmed the latter for first graders and demonstrated that children who show above average first-to-fifth grade gains in visuospatial memory have an advantage over other children in mathematics. The study involved the assessment of the mathematics and reading achievement of 177 children in kindergarten to fifth grade, inclusive, and their working memory capacity and processing speed in first and fifth grade. Intelligence was assessed in first grade and their second to fourth grade teachers reported on their in-class attentive behavior. Developmental gains in visuospatial memory span (d = 2.4) were larger than gains in the capacity of the central executive (d = 1.6) that in turn were larger than gains in phonological memory span (d = 1.1). First to fifth grade gains in visuospatial memory and in speed of numeral processing predicted end of fifth grade mathematics achievement, as did first grade central executive scores, intelligence, and in-class attentive behavior. The results suggest there are important individual differences in the rate of growth of visuospatial memory during childhood and that these differences become increasingly important for mathematics learning. PMID:23936154

  14. Design of Modified HRRN Scheduling Algorithm for Priority Systems Using Hybrid Priority Scheme

    OpenAIRE

    Varma, P. Surendra

    2013-01-01

    The basic aim of this paper is to design a scheduling algorithm which is suitable for priority systems and it should not suffer with starvation or indefinite postponement. Highest Response Ratio Next (HRRN) scheduling is a non-preemptive discipline, in which the priority of each job is dependent on its estimated run time, and also the amount of time it has spent waiting. Jobs gain higher priority the longer they wait, which prevents indefinite postponement (process starvation). In fact, the j...

  15. Pengaturan Kecepatan Motor Spindle pada Retrofit Mesin Bubut CNC Menggunakan Kontroler PID Gain Scheduling

    OpenAIRE

    Fikri Yoga Permana; Mochammad Rameli

    2013-01-01

    Pada mesin bubut Computerized Numerical Control (CNC), proses pemahatan benda kerja memerlukan kecepatan potong yang tetap agar hasil kerja memiliki tingkat presisi tinggi. Dalam prakteknya, ketika terjadi pemotongan, diameter benda kerja akan selalu berkurang dan tingkat kedalaman pahat berubah-ubah sesuai dengan proses yang dilakukan sehingga mempengaruhi kecepatan putar motor spindle sehingga mengakibatkan tingkat presisi hasil kerja menjadi berkurang. Pada penelitian ini, digunakan kontro...

  16. Gain-scheduling control of a monocular vision-based human-following robot

    CSIR Research Space (South Africa)

    Burke, Michael G

    2011-08-01

    Full Text Available trajectory and a traditional point-to-point controller. Our system is implemented on a terrestrial skid steering platform with two available control variables: angular and forward velocity. Only forward motion is discussed below, as the control law... typically been divided into two strategies: simple point- to-point positioning without control of orientation and ? This work was supported by funding from the Council for Scientific and Industrial Research (CSIR), South Africa. direction-based motion...

  17. Gain Scheduling Control of Gas Turbine Engines: Stability by Computing a Single Quadratic Lyapunov Function

    Science.gov (United States)

    2013-06-01

    the controller has the similar structure as (8) δ ẋc = Acv (α)δxc +Bcv(α)[δy−δ r], δv =Ccv(α)δxc +Dcv(α)[δy−δ r], ∀α ∈Ω, (23) where δv = v− ve(α), ∀α...Ω. (24) Now, since xce(α) = 0, ve(α) = 0, ∀α , the controller is ẋc = Acv (α)xc +Bcv(α)[δy−δ r], v =Ccv(α)xc +Dcv(α)[δy−δ r], ∀α ∈Ω, (25) rewriting...controller (25) with α(t) = p(y(t)), we obtain ẋc = Acv (p(y))x c +Bcv(p(y))[y− r], v =Ccv(p(y))x c +Dcv(p(y))[y− r]. (26) Linearization of (26) about

  18. LMI-based gain scheduled controller synthesis for a class of linear parameter varying systems

    DEFF Research Database (Denmark)

    Bendtsen, Jan Dimon; Anderson, Brian; Lanzon, Alexander

    2006-01-01

    of significant practical relevance to control designers. The control design presented in this paper has the properties that the system matrix of the closed loop is multi-affine in the various scalar parameters, and that the resulting controller ensures a certain degree of stability for the closed loop even when...... as a standard linear time-invariant (LTI) design combined with a set of linear matrix inequalities, which can be solved efficiently with software tools. The design procedure is illustrated by a numerical example....

  19. LMI-based Gain Scheduled Robust Flux Observer for Induction Motors

    DEFF Research Database (Denmark)

    Trangbæk, Klaus

    2000-01-01

    In this paper a robust flux observer for an induction motor is developed through an LMI approach. The observer is robust to changes in rotational speed and in rotor and stator resistances. The problem is formulated as complex-valued rank constrained LMIs and solved through alternating projections...

  20. Intelligent Control of Diesel Generators Using Gain-Scheduling Based on Online External-Load Estimation

    DEFF Research Database (Denmark)

    Mai, Christian; Jepsen, Kasper Lund; Yang, Zhenyu

    2014-01-01

    The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic reco...... a controlled AC-motor is employed to emulate a diesel engine. The testing results clearly show that the proposed control solution can lead to a better overall system performance than most existing solutions do, especially subject to widely diverse operating conditions.......The development of an intelligent control solution for a wide range of diesel generators is discussed. Compared with most existing solutions, the advantages of the proposed solution lie in two folds: (i) The proposed control has the plug-and-play capability which is reflected by an automatic...... recognition procedure when it is plugged into a specific diesel generator, such that some extensive manual-tuning of the installed controller can be significantly reduced; (ii) The proposed control has an real-time adaptability by using the online external load estimation, such that the integrated system can...

  1. Nonlinear dynamic positioning of ships with gain-scheduled wave filtering

    DEFF Research Database (Denmark)

    Torsetnes, Guttorm; Jouffroy, Jerome; Fossen, Thor I.

    This paper presents a globally contracting controller for regulation and dynamic positioning of ships, using only position measurements. For this purpose a globally contracting observer which reconstructs the unmeasured states is constructed. The observer produces accurate estimates of position...

  2. Graduate Program Scheduling Gains Flexibility through Container Courses: A Case Study

    Science.gov (United States)

    Rose, Richard

    2011-01-01

    Online course delivery makes possible one innovation which can provide each student with greater program flexibility as well as some personal ownership of the direction and pace of his degree progress. This concept can be called the "container course." A container course is the offering of more than one course simultaneously under a single course…

  3. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    Dynamic models of congestion so far rely on exogenous scheduling preferences of travelers, based for example on disutility of deviation from a preferred departure or arrival time for a trip. This paper provides a more fundamental view in which travelers derive utility just from consumption and le...

  4. Stochastic scheduling on unrelated machines

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    2013-01-01

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous machines/processors and a certain degree of uncertainty about the actual sizes of jobs. The first characteristic entails machine dependent processing times of jobs and is captured by the classical

  5. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1996-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the US Department of Energy (DOE). This document contains the planned 1996 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project

  6. The Vessel Schedule Recovery Problem

    DEFF Research Database (Denmark)

    Brouer, Berit Dangaard; Plum, Christian Edinger Munk; Vaaben, Bo

    Maritime transportation is the backbone of world trade and is accountable for around 3% of the worlds CO2 emissions. We present the Vessel Schedule Recovery Problem (VSRP) to evaluate a given disruption scenario and to select a recovery action balancing the trade off between increased bunker...

  7. Course Scheduling and Academic Performance

    Science.gov (United States)

    Dills, Angela K.; Hernandez-Julian, Rey

    2008-01-01

    This paper examines the relationship between course scheduling and student achievement, controlling for student and course characteristics. The literature in psychology recognizes that performance varies by time of day and that spacing learning out over time may foster greater long-term memory of items. We use student grades as a measure of…

  8. Job scheduling, cooperation and control

    NARCIS (Netherlands)

    Calleja, P.; Estevez Fernandez, M.A.; Borm, P.; Hamers, H.

    2006-01-01

    This paper studies one machine job scheduling situations where clients can have more than one job to be processed and where a job can be of interest for different players. Corresponding cooperative games are introduced and a result on balancedness is provided. © 2005 Elsevier B.V. All rights

  9. Endogenous scheduling preferences and congestion

    DEFF Research Database (Denmark)

    Fosgerau, Mogens; Small, Kenneth

    2010-01-01

    and leisure, but agglomeration economies at home and at work lead to scheduling preferences forming endogenously. Using bottleneck congestion technology, we obtain an equilibrium queuing pattern consistent with a general version of the Vickrey bottleneck model. However, the policy implications are different...

  10. Lifetime Improvement by Battery Scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Schmitt, Jens B.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of their batteries. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to

  11. Lifetime improvement by battery scheduling

    NARCIS (Netherlands)

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.

    The use of mobile devices is often limited by the lifetime of its battery. For devices that have multiple batteries or that have the option to connect an extra battery, battery scheduling, thereby exploiting the recovery properties of the batteries, can help to extend the system lifetime. Due to the

  12. Static Scheduling of Periodic Hardware Tasks with Precedence and Deadline Constraints on Reconfigurable Hardware Devices

    Directory of Open Access Journals (Sweden)

    Ikbel Belaid

    2011-01-01

    Full Text Available Task graph scheduling for reconfigurable hardware devices can be defined as finding a schedule for a set of periodic tasks with precedence, dependence, and deadline constraints as well as their optimal allocations on the available heterogeneous hardware resources. This paper proposes a new methodology comprising three main stages. Using these three main stages, dynamic partial reconfiguration and mixed integer programming, pipelined scheduling and efficient placement are achieved and enable parallel computing of the task graph on the reconfigurable devices by optimizing placement/scheduling quality. Experiments on an application of heterogeneous hardware tasks demonstrate an improvement of resource utilization of 12.45% of the available reconfigurable resources corresponding to a resource gain of 17.3% compared to a static design. The configuration overhead is reduced to 2% of the total running time. Due to pipelined scheduling, the task graph spanning is minimized by 4% compared to sequential execution of the graph.

  13. Master schedule for CY-1982 Hanford environmental surveillance routine program

    Energy Technology Data Exchange (ETDEWEB)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites. (ATT)

  14. Master schedule for CY-1982 Hanford environmental surveillance routine program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Sula, M.J.; Eddy, P.A.

    1981-12-01

    This report provides the current schedule of data collection for the routine environmental surveillance program at the Hanford Site. The environmental surveillance program objectives are to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5484.1. The routine sampling schedule provided does not include samples which are planned to be collected during FY-1982 in support of special studies or for quality control purposes. In addition, the routine program outlined in this schedule is subject to modification during the year in response to changes in Site operations, program requirements, or unusual sample results. Sampling schedules are presented for the following: air; Columbia River; sanitary water; surface water; ground water; foodstuffs; wildlife; soil and vegetation; external radiation measurements; portable instrument surveys; and surveillance of waste disposal sites

  15. Environmental monitoring master sampling schedule, January--December 1990

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1990-01-01

    Environmental monitoring of the Hanford Site is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). This document contains the planned schedule for routine sample collection for calendar year 1990 for the Environment Surveillance and Ground-Water Monitoring Projects. This schedule is subject to modification during the year in response to changes in Site operations, program requirements, and the nature of the observed results. Operational limitations such as weather, mechanical failures, sample availability, etc., may also require schedule modifications. Changes will be documented in the respective project files, but this plan will not be reissued. The purpose of these monitoring projects is to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs. This schedule includes ground-water sampling performed by PNL for environmental surveillance of the Hanford Site.

  16. Integrated scheduling of tasks and gynecologists to improve patient appointment scheduling : a case study

    NARCIS (Netherlands)

    van de Vrugt, Maartje; Luen-English, Samuel J.; Bastiaansen, W.A.P.; Kleinluchtenbeld, S.; Lardinois, W.T.P.; Pots, M.H.; Schoonbergen, D.H.; Hans, Erwin W.; Hurink, Johann L.; Boucherie, Richardus J.

    Like many hospital departments, the gynecology department of the Jeroen Bosch Hospital experienced difficulties with scheduling outpatient appointments at the medically preferred times. Despite the time invested in creating the schedule, the compliance of the achieved schedules with the preferences

  17. Project management with dynamic scheduling baseline scheduling, risk analysis and project control

    CERN Document Server

    Vanhoucke, Mario

    2013-01-01

    The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule's risk as preparation of the project control phase during project progress. This dynamic scheduling point of view implicitly assumes that the usability of a project's baseline schedule is rather limited and only acts as a point of reference in the project life cycle.

  18. Requested meals versus scheduled meals

    Directory of Open Access Journals (Sweden)

    Ciampolini M

    2012-04-01

    Full Text Available Mario CiampoliniPreventive Gastroenterology Unit, Department of Paediatrics, Università di Firenze, Florence, ItalyBackground: Scheduled meals are considered to be equivalent to those requested by the infant (null hypothesis. In adults, we have found high blood glucose before scheduled meals and low blood glucose after recognition of validated initial hunger. Low preprandial blood glucose is associated with a decrease in energy intake and body weight both in adults who are overtly overweight and in those who are of normal weight with insulin resistance (hidden overweight. In this study, we investigated the validity of the null hypothesis between scheduled and requested meals in 2-year-old infants with chronic nonspecific diarrhea.Methods: We trained a "recognizing request" meal pattern in 70 mother-infant pairs. The trained meal pattern consisted of administering food after a first request that we validated by blood glucose measurement in the hospital laboratory. Using a 7-day food diary, mothers reported preprandial blood glucose measurements for their infants three times a day. We assessed mean preprandial blood glucose, daily energy intake, days with diarrhea, blood parameters, and anthropometry before training and 4 months after training, and compared the results with measurements in 73 randomly selected untrained controls.Results: In the trained group, there was a decrease in mean blood glucose from 86.9 ± 9.4 mg/dL to 76.4 ± 6.7 mg/dL (P < 0.0001, as well as a decrease in energy intake and days with diarrhea in comparison with control infants who maintained scheduled meals. Only two of 21 infants who had a mean blood glucose lower than 81.2 mg/dL at recruitment showed a statistically significant decrease in mean blood glucose, whereas 36 of 49 infants above this cutoff level showed a statistically significant decrease after training (Chi-square test, P < 0.0001.Conclusion: Requested meals are associated with low preprandial blood

  19. Heritability of gestational weight gain

    DEFF Research Database (Denmark)

    Andersson, Elina Scheers; Silventoinen, Karri; Tynelius, Per

    2015-01-01

    Gestational weight gain (GWG) is a complex trait involving intrauterine environmental, maternal environmental, and genetic factors. However, the extent to which these factors contribute to the total variation in GWG is unclear. We therefore examined the genetic and environmental influences on the...

  20. Yield gains in leafy vegetables

    Science.gov (United States)

    Yield of all crops have increased during the past century through improved cultural practices and plant breeding. We reviewed gains in yield of lettuce and spinach in the U.S., principally California and Arizona. We proposed several genetic models for yield of lettuce based on the market type: whole...

  1. Gain Dependence of the Noise in the Single Electron Transistor

    OpenAIRE

    Starmark, B.; Henning, Torsten; Korotkov, A. N.; Claeson, T.; Delsing, P.

    1998-01-01

    An extensive investigation of low frequency noise in single electron transistors as a function of gain is presented. Comparing the output noise with gain for a large number of bias points, it is found that the noise is dominated by external charge noise. For low gains we find an additional noise contribution which is compared to a model including resistance fluctuations. We conclude that this excess noise is not only due to resistance fluctuations. For one sample, we find a record low minimum...

  2. CMS Planning and Scheduling System

    CERN Document Server

    Kotamaki, M

    1998-01-01

    The paper describes the procedures and the system to build and maintain the schedules needed to manage time, resources, and progress of the CMS project. The system is based on the decomposition of the project into work packages, which can be each considered as a complete project with its own structure. The system promotes the distribution of the decision making and responsibilities to lower levels in the organisation by providing a state-of-the-art system to formalise the external commitments of the work packages without limiting their ability to modify their internal schedules to best meet their commitments. The system lets the project management focus on the interfaces between the work packages and alerts the management immediately if a conflict arises. The proposed system simplifies the planning and management process and eliminates the need for a large, centralised project management system.

  3. Toward Realistic Acquisition Schedule Estimates

    Science.gov (United States)

    2016-04-30

    through, for example, Program Evaluation and Review Technique, Critical Path Method and Gantt Charts (Blanchard & Fabrycky, 2006, esp. Chap. 11...million lines in the F-15E. Lines of code in the F-35 vary with source and date. A 2014 CRS report estimates F- 35 software as containing...set of tasks (e.g., PERT, Gantt Charts) 4 SCHEDULE EST. RELATIONSHIPS Some Candidate Explanatory Variables • Risk Reduction Efforts • Contract

  4. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program

  5. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1995-02-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the U.S. Department of Energy (DOE). This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring onsite drinking water falls outside the scope of the SESP. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control, and reporting. The ground-water sampling schedule identifies ground-water sampling .events used by PNL for environmental surveillance of the Hanford Site. Sampling is indicated as annual, semi-annual, quarterly, or monthly in the sampling schedule. Some samples are collected and analyzed as part of ground-water monitoring and characterization programs at Hanford (e.g. Resources Conservation and Recovery Act (RCRA), Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), or Operational). The number of samples planned by other programs are identified in the sampling schedule by a number in the analysis column and a project designation in the Cosample column. Well sampling events may be merged to avoid redundancy in cases where sampling is planned by both-environmental surveillance and another program.

  6. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1993-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest Laboratory (PNL) for the US Department of Energy (DOE). Samples are routinely collected and analyzed to determine the quality of air, surface water, ground water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. This document contains the planned schedule for routine sample collection for the Surface Environmental Surveillance Project (SESP) and Drinking Water Project, and Ground-Water Surveillance Project.

  7. Issues in Locomotive Crew Management and Scheduling

    Science.gov (United States)

    1990-11-01

    This study explores matters related to the scheduling and management of locomotive crews, particularly as they : might contribute to fatigue and stress. It describes how crews are scheduled currently, why there is so much : unpredictability in schedu...

  8. DME Prosthetics Orthotics, and Supplies Fee Schedule

    Data.gov (United States)

    U.S. Department of Health & Human Services — Durable Medical Equipment, Prosthetics-Orthotics, and Supplies Fee Schedule. The list contains the fee schedule amounts, floors, and ceilings for all procedure codes...

  9. Pittsburgh International Airport - Scheduled Passenger Traffic

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Attached is Pittsburgh International Airport’s Monthly Scheduled Traffic Report. This report contains a year-over-year (YOY) analysis of scheduled flights and...

  10. 46 CFR 525.2 - Terminal schedules.

    Science.gov (United States)

    2010-10-01

    ... their own negligence, or that impose upon others the obligation to indemnify or hold-harmless the terminals from liability for their own negligence. (2) Enforcement of terminal schedules. Any schedule that...

  11. GSA eLibrary Schedules and Contracts

    Data.gov (United States)

    General Services Administration — GSA eLibrary (formerly Schedules e-Library) is the online source for the latest contract award information for: GSA Schedules; Department of Veterans Affairs (VA)...

  12. EVALUATION OF THE TRANSITION TO THE ORGANIZATION OF FREIGHT TRAINS TRAFFIC BY THE SCHEDULE

    Directory of Open Access Journals (Sweden)

    Dmitriy KOZACHENKO

    2016-03-01

    Full Text Available The paper considers the issues of bulk conveyance organization between industrial enterprises on schedule. Currently the movement of the main part of freight trains is performed on preparedness and occupation processes of separate schedule train paths by some terminals are not fixed. And, due to the lack of statistical material on the punctuality of the schedule for the movement of freight trains, research of the passenger trains movement with subsequent dissemination of results on freight movement were carried out by the authors. The values of the additional time reserves that should be included in the schedule of trains, and the schedule for the turnover of freight trains to provide conditional interaction of railroads and industrial enterprises in Ukraine were proposed. The obtained results can be used for the technical-and-economic calculations of transition effectiveness of industrial enterprises for maintenance on schedule as well as in the development of schedule on the initial stages of testing technology.

  13. Space network scheduling benchmark: A proof-of-concept process for technology transfer

    Science.gov (United States)

    Moe, Karen; Happell, Nadine; Hayden, B. J.; Barclay, Cathy

    1993-01-01

    This paper describes a detailed proof-of-concept activity to evaluate flexible scheduling technology as implemented in the Request Oriented Scheduling Engine (ROSE) and applied to Space Network (SN) scheduling. The criteria developed for an operational evaluation of a reusable scheduling system is addressed including a methodology to prove that the proposed system performs at least as well as the current system in function and performance. The improvement of the new technology must be demonstrated and evaluated against the cost of making changes. Finally, there is a need to show significant improvement in SN operational procedures. Successful completion of a proof-of-concept would eventually lead to an operational concept and implementation transition plan, which is outside the scope of this paper. However, a high-fidelity benchmark using actual SN scheduling requests has been designed to test the ROSE scheduling tool. The benchmark evaluation methodology, scheduling data, and preliminary results are described.

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2007

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2007-01-31

    This document contains the calendar year 2007 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2007 in which case the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2007.

  15. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2011

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2011-01-21

    This document contains the calendar year 2011 schedule for the routine collection of samples for the Surface Environmental Surveillance Project and the Drinking Water Monitoring Project. Each section includes sampling locations, sampling frequencies, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis. If a sample will not be collected in 2011, the anticipated year for collection is provided. Maps showing approximate sampling locations are included for media scheduled for collection in 2011.

  16. Agile Systems Engineering-Kanban Scheduling Subsection

    Science.gov (United States)

    2017-03-10

    Agile Systems Engineering – Kanban Scheduling Subsection Technical Report SERC-2017-TR-104 March 10, 2017 Principal Investigator: Dr...scheduling systems based on explicit, transparent, and continuously updated value of work [6], [7], [8]. This Kanban -based Scheduling System Network (KSSN...and literature searches. • RT-35/35A, Agile-Lean Software Engineering (ALSE) Evaluating Kanban in SE, focused on using pull scheduling techniques

  17. 75 FR 7411 - Schedule of Water Charges

    Science.gov (United States)

    2010-02-19

    ... DELAWARE RIVER BASIN COMMISSION 18 CFR Part 410 Schedule of Water Charges AGENCY: Delaware River... Administrative Manual--Part III--Basin Regulations--Water Supply Charges to revise the schedule of water charges... commenter and the subject line ``Schedule of Water Charges.'' FOR FURTHER INFORMATION, CONTACT: Please...

  18. 40 CFR 141.702 - Sampling schedules.

    Science.gov (United States)

    2010-07-01

    ... serving at least 10,000 people must submit their sampling schedule for the initial round of source water... submitting the sampling schedule that EPA approves. (3) Systems serving fewer than 10,000 people must submit... analytical result for a scheduled sampling date due to equipment failure, loss of or damage to the sample...

  19. An improved scheduling algorithm for linear networks

    KAUST Repository

    Bader, Ahmed

    2017-02-09

    In accordance with the present disclosure, embodiments of an exemplary scheduling controller module or device implement an improved scheduling process such that the targeted reduction in schedule length can be achieve while incurring minimal energy penalty by allowing for a large rate (or duration) selection alphabet.

  20. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  1. 7 CFR 283.29 - Scheduling conference.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Scheduling conference. 283.29 Section 283.29... Procedure for Appeals of QC Claims of Less Than $50,000 § 283.29 Scheduling conference. (a) Time and place. The ALJ shall direct the parties or their counsel to attend a scheduling conference following the...

  2. Hanford Site Environmental Surveillance Master Sampling Schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1999-01-01

    Environmental surveillance of the Hanford Site and surrounding areas is conducted by the Pacific Northwest National Laboratory (PNNL) for the U.S. Department of Energy (DOE). Sampling is conducted to evaluate levels of radioactive and nonradioactive pollutants in the Hanford environs, as required in DOE Order 5400.1, ''General Environmental protection Program,'' and DOE Order 5400.5, ''Radiation Protection of the Public and the Environment.'' The sampling methods are described in the Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office, DOE/RL-91-50, Rev.2, U.S. Department of Energy, Richland, Washington. This document contains the CY1999 schedules for the routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes the sampling location, sample type, and analyses to be performed on the sample. In some cases, samples are scheduled on a rotating basis and may not be collected in 1999 in which case the anticipated year for collection is provided. In addition, a map is included for each media showing approximate sampling locations

  3. Optimal scheduling for enhanced coal bed methane production through CO2 injection

    International Nuclear Information System (INIS)

    Huang, Yuping; Zheng, Qipeng P.; Fan, Neng; Aminian, Kashy

    2014-01-01

    Highlights: • A novel deterministic optimization model for CO 2 -ECBM production scheduling. • Maximize the total profit from both sales of natural gas and CO 2 credits trading in the carbon market. • A stochastic model incorporating uncertainties and dynamics of NG price and CO 2 credit. - Abstract: Enhanced coal bed methane production with CO 2 injection (CO 2 -ECBM) is an effective technology for accessing the natural gas embedded in the traditionally unmineable coal seams. The revenue via this production process is generated not only by the sales of coal bed methane, but also by trading CO 2 credits in the carbon market. As the technology of CO 2 -ECBM becomes mature, its commercialization opportunities are also springing up. This paper proposes applicable mathematical models for CO 2 -ECBM production and compares the impacts of their production schedules on the total profit. A novel basic deterministic model for CO 2 -ECBM production including the technical and chemical details is proposed and then a multistage stochastic programming model is formulated in order to address uncertainties of natural gas price and CO 2 credit. Both models are nonlinear programming problems, which are solved by commercial nonlinear programming software BARON via GAMS. Numerical experiments show the benefits (e.g., expected profit gain) of using stochastic models versus deterministic models

  4. Improved Gain Microstrip Patch Antenna

    Science.gov (United States)

    2015-08-06

    frequency selective structure (FSS) as a layer above a microstrip patch antenna. This is done to filter undesirable frequencies. For this purpose the FSS...is used for isolating the antenna from the filtered frequency, not improving the gain of the antenna. [0008] Thus, there is a need for microstrip...selective surface applied. The passband is generally indicated as the region where the curve passes below a VSWR of 3. These results indicate a

  5. Optical gain in silicon nanocrystals

    Czech Academy of Sciences Publication Activity Database

    Pelant, Ivan

    2011-01-01

    Roč. 208, č. 3 (2011), s. 625-630 ISSN 1862-6300 R&D Projects: GA AV ČR KAN400100701; GA AV ČR(CZ) IAA101120804; GA MŠk LC510 Institutional research plan: CEZ:AV0Z10100521 Keywords : experimental approach * luminescence * nanocrystals * optical gain * silicon Subject RIV: BM - Solid Matter Physics ; Magnetism Impact factor: 1.463, year: 2011

  6. L2-gain and passivity techniques in nonlinear control

    CERN Document Server

    van der Schaft, Arjan

    2017-01-01

    This standard text gives a unified treatment of passivity and L2-gain theory for nonlinear state space systems, preceded by a compact treatment of classical passivity and small-gain theorems for nonlinear input-output maps. The synthesis between passivity and L2-gain theory is provided by the theory of dissipative systems. Specifically, the small-gain and passivity theorems and their implications for nonlinear stability and stabilization are discussed from this standpoint. The connection between L2-gain and passivity via scattering is detailed. Feedback equivalence to a passive system and resulting stabilization strategies are discussed. The passivity concepts are enriched by a generalised Hamiltonian formalism, emphasising the close relations with physical modeling and control by interconnection, and leading to novel control methodologies going beyond passivity. The potential of L2-gain techniques in nonlinear control, including a theory of all-pass factorizations of nonlinear systems, and of parametrization...

  7. Contrast Gain Control Model Fits Masking Data

    Science.gov (United States)

    Watson, Andrew B.; Solomon, Joshua A.; Null, Cynthia H. (Technical Monitor)

    1994-01-01

    We studied the fit of a contrast gain control model to data of Foley (JOSA 1994), consisting of thresholds for a Gabor patch masked by gratings of various orientations, or by compounds of two orientations. Our general model includes models of Foley and Teo & Heeger (IEEE 1994). Our specific model used a bank of Gabor filters with octave bandwidths at 8 orientations. Excitatory and inhibitory nonlinearities were power functions with exponents of 2.4 and 2. Inhibitory pooling was broad in orientation, but narrow in spatial frequency and space. Minkowski pooling used an exponent of 4. All of the data for observer KMF were well fit by the model. We have developed a contrast gain control model that fits masking data. Unlike Foley's, our model accepts images as inputs. Unlike Teo & Heeger's, our model did not require multiple channels for different dynamic ranges.

  8. Progress in high gain inertial confinement fusion

    International Nuclear Information System (INIS)

    Sun Jingwen

    2001-01-01

    The author reviews the progress in laboratory high gain inertial confinement fusion (ICF), including ICF capsule physics, high-energy-density science, inertial fusion energy, the National Ignition Facility (NIF) and its design of ignition targets and the peta watt laser breakthrough. High power laser, particle beam, and pulsed power facilities around the world have established the new laboratory field of high-energy- density plasma physics and have furthered development of inertial fusion. New capabilities such as those provided by high-brightness peta watt lasers have enabled the study of matter feasible in conditions previously unachievable on earth. Science and technology developed in inertial fusion research have found near-term commercial use and have enabled steady progress toward the goal of fusion ignition and high gain in the laboratory, and have opened up new fields of study for the 21 st century

  9. Cure Schedule for Stycast 2651/Catalyst 9.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Emerson & Cuming technical data sheet (TDS) for Stycast 2651/Catalyst 9 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation uses one of the schedules within the TDS and adds a “post cure” to obtain full reaction.

  10. A System for Automatically Generating Scheduling Heuristics

    Science.gov (United States)

    Morris, Robert

    1996-01-01

    The goal of this research is to improve the performance of automated schedulers by designing and implementing an algorithm by automatically generating heuristics by selecting a schedule. The particular application selected by applying this method solves the problem of scheduling telescope observations, and is called the Associate Principal Astronomer. The input to the APA scheduler is a set of observation requests submitted by one or more astronomers. Each observation request specifies an observation program as well as scheduling constraints and preferences associated with the program. The scheduler employs greedy heuristic search to synthesize a schedule that satisfies all hard constraints of the domain and achieves a good score with respect to soft constraints expressed as an objective function established by an astronomer-user.

  11. Flux Gain for Next-Generation Neutron-Scattering Instruments Resulting From Improved Supermirror Performance

    International Nuclear Information System (INIS)

    Rehm, C.

    2001-01-01

    Next-generation spallation neutron source facilities will offer instruments with unprecedented capabilities through simultaneous enhancement of source power and usage of advanced optical components. The Spallation Neutron Source (SNS), already under construction at Oak Ridge National Laboratory and scheduled to be completed by 2006, will provide greater than an order of magnitude more effective source flux than current state-of-the-art facilities, including the most advanced research reactors. An additional order of magnitude gain is expected through the use of new optical devices and instrumentation concepts. Many instrument designs require supermirror (SM) neutron guides with very high critical angles for total reflection. In this contribution, they discuss how the performance of modern neutron scattering instruments depends on the efficiency of these supermirrors. They outline ideas for enhancing the performance of the SM coatings, particularly for improving the reflectivity at the position of the critical wave vector transfer. A simulation program has been developed which allows different approaches for SM designs to be studied. Possible instrument performance gains are calculated for the example of the SNS reflectometer

  12. Runway Scheduling Using Generalized Dynamic Programming

    Science.gov (United States)

    Montoya, Justin; Wood, Zachary; Rathinam, Sivakumar

    2011-01-01

    A generalized dynamic programming method for finding a set of pareto optimal solutions for a runway scheduling problem is introduced. The algorithm generates a set of runway fight sequences that are optimal for both runway throughput and delay. Realistic time-based operational constraints are considered, including miles-in-trail separation, runway crossings, and wake vortex separation. The authors also model divergent runway takeoff operations to allow for reduced wake vortex separation. A modeled Dallas/Fort Worth International airport and three baseline heuristics are used to illustrate preliminary benefits of using the generalized dynamic programming method. Simulated traffic levels ranged from 10 aircraft to 30 aircraft with each test case spanning 15 minutes. The optimal solution shows a 40-70 percent decrease in the expected delay per aircraft over the baseline schedulers. Computational results suggest that the algorithm is promising for real-time application with an average computation time of 4.5 seconds. For even faster computation times, two heuristics are developed. As compared to the optimal, the heuristics are within 5% of the expected delay per aircraft and 1% of the expected number of runway operations per hour ad can be 100x faster.

  13. GAIN Technology Workshops Summary Report

    International Nuclear Information System (INIS)

    Braase, Lori Ann

    2016-01-01

    National and global demand for nuclear energy is increasing and United States (U.S.) global leadership is eroding. There is a sense of urgency with respect to the deployment of the innovative nuclear energy technologies. The Gateway for Accelerated Innovation in Nuclear (GAIN) initiative is based on the simultaneous achievement of three strategic goals. The first is maintaining global technology leadership within the U.S. Department of Energy (DOE). The second is enabling global industrial leadership for nuclear vendors and suppliers. The third is focused on utility optimization of nuclear energy within the clean energy portfolio. An effective public-private partnership is required to achieve these goals. DOEs recognizes the recent sense of urgency new developers and investors have in getting their concepts to market. They know that time to market for nuclear technology takes too long and the facilities needed to conduct the necessary research, development and demonstration (RD&D) activities are very expensive to develop and maintain. Early technologies, in the lower technology readiness levels (TRL) need materials testing, analysis, modeling, code development, etc., most of which currently exists in the DOE national laboratory system. However, mature technologies typically need large component testing and demonstration facilities, which are expensive and long-lead efforts. By understanding the needs of advanced nuclear technology developers, GAIN will connect DOE national laboratory capabilities (e.g., facilities, expertise, materials, and data) with industry RD&D needs. In addition, GAIN is working with the Nuclear Regulatory Commission (NRC) to streamline processes and increase understanding of the licensing requirements for advanced reactors.

  14. GAIN Technology Workshops Summary Report

    Energy Technology Data Exchange (ETDEWEB)

    Braase, Lori Ann [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-08-01

    National and global demand for nuclear energy is increasing and United States (U.S.) global leadership is eroding. There is a sense of urgency with respect to the deployment of the innovative nuclear energy technologies. The Gateway for Accelerated Innovation in Nuclear (GAIN) initiative is based on the simultaneous achievement of three strategic goals. The first is maintaining global technology leadership within the U.S. Department of Energy (DOE). The second is enabling global industrial leadership for nuclear vendors and suppliers. The third is focused on utility optimization of nuclear energy within the clean energy portfolio. An effective public-private partnership is required to achieve these goals. DOEs recognizes the recent sense of urgency new developers and investors have in getting their concepts to market. They know that time to market for nuclear technology takes too long and the facilities needed to conduct the necessary research, development and demonstration (RD&D) activities are very expensive to develop and maintain. Early technologies, in the lower technology readiness levels (TRL) need materials testing, analysis, modeling, code development, etc., most of which currently exists in the DOE national laboratory system. However, mature technologies typically need large component testing and demonstration facilities, which are expensive and long-lead efforts. By understanding the needs of advanced nuclear technology developers, GAIN will connect DOE national laboratory capabilities (e.g., facilities, expertise, materials, and data) with industry RD&D needs. In addition, GAIN is working with the Nuclear Regulatory Commission (NRC) to streamline processes and increase understanding of the licensing requirements for advanced reactors.

  15. Performance improvement of per-user threshold based multiuser switched scheduling system

    KAUST Repository

    Nam, Haewoon

    2013-01-01

    SUMMARY This letter proposes a multiuser switched scheduling scheme with per-user threshold and post user selection and provides a generic analytical framework for determining the optimal feedback thresholds. The proposed scheme applies an individual feedback threshold for each user rather than a single common threshold for all users to achieve some capacity gain due to the flexibility of threshold selection as well as a lower scheduling outage probability. In addition, since scheduling outage may occur with a non-negligible probability, the proposed scheme employs post user selection in order to further improve the ergodic capacity, where the user with the highest potential for a higher channel quality than other users is selected. Numerical and simulation results show that the capacity gain by post user selection is significant when random sequence is used. Copyright © 2013 The Institute of Electronics, Information and Communication Engineers.

  16. The Location-Scheduled Control Methodology as Applied to Nanosatellites

    Science.gov (United States)

    Sorgenfrei, Matthew Charles

    . With the basic efficacy of the genetic algorithm established, in the next phase of the dissertation a novel controller optimization approach known as location-scheduled control is introduced. Under location-scheduled control, the use of the genetic algorithm is extended to not only optimize the gain parameters of a given control law but also the physical location of the control actuators within the spacecraft. This dual optimization of both controller gain parameters and physical properties of the spacecraft yields a catalog of design solutions that can be called upon from mission to mission, which significantly reduces the time required for control system design. The ability to easily relocate the hardware components of a spacecraft control system is enabled by a class of spacecraft known as CubeSats, which will be described in detail. In the final portion of this dissertation the location-scheduled control methodology is applied to a real-word testbed system and hardware results are compared to those obtained via simulation. This system makes use of a unique property of superconducting physics known as flux-pinned interfaces that allows CubeSat-scale test articles to be easily reconfigured. The location-scheduled control approach is used to simultaneously determine the optimal configuration of the reconfigurable spacecraft system and the appropriate gains for a single-axis reorientation maneuver. It is shown through hardware testing that the genetic algorithm once again yields a combination of system configuration and controller gain values that outperforms those found by a control systems engineer.

  17. 76 FR 65634 - Redetermination of the Consolidated Net Unrealized Built-In Gain and Loss

    Science.gov (United States)

    2011-10-24

    .... Under this rule, unrealized gain or loss with respect to the stock of a member of the loss group (an... unrecognized gain or loss on included subsidiary stock generally reflects the same economic gain or loss... eliminates the duplicative gain or loss reflected in stock basis. Conversely, if a member first recognizes...

  18. Environmental surveillance master sampling schedule

    International Nuclear Information System (INIS)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site

  19. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  20. Broadcast scheduling with data bundles

    Science.gov (United States)

    Chen, Fangfei; Pizzocaro, Diego; Johnson, Matthew P.; Bar-Noy, Amotz; Preece, Alun; La Porta, Thomas

    2011-06-01

    Broadcast scheduling has been extensively studied in wireless environments, where a base station broadcasts data to multiple users. Due to the sole wireless channel's limited bandwidth, only a subset of the needs may be satisfiable, and so maximizing total (weighted) throughput is a popular objective. In many realistic applications, however, data are dependent or correlated in the sense that the joint utility of a set of items is not simply the sum of their individual utilities. On the one hand, substitute data may provide overlapping information, so one piece of data item may have lower value if a second data item has already been delivered; on the other hand, complementary data are more valuable than the sum of their parts, if, for example, one data item is only useful in the presence of a second data item. In this paper, we define a data bundle to be a set of data items with possibly nonadditive joint utility, and we study a resulting broadcast scheduling optimization problem whose objective is to maximize the utility provided by the data delivered.

  1. Schedule optimization study implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed.

  2. Environmental surveillance master sampling schedule

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, L.E.

    1994-02-01

    This document contains the planned 1994 schedules for routine collection of samples for the Surface Environmental Surveillance Project (SESP), Drinking Water Project, and Ground-Water Surveillance Project. Samples are routinely collected for the SESP and analyzed to determine the quality of air, surface water, soil, sediment, wildlife, vegetation, foodstuffs, and farm products at Hanford Site and surrounding communities. The responsibility for monitoring the onsite drinking water falls outside the scope of the SESP. The Hanford Environmental Health Foundation is responsible for monitoring the nonradiological parameters as defined in the National Drinking Water Standards while PNL conducts the radiological monitoring of the onsite drinking water. PNL conducts the drinking water monitoring project concurrent with the SESP to promote efficiency and consistency, utilize the expertise developed over the years, and reduce costs associated with management, procedure development, data management, quality control and reporting. The ground-water sampling schedule identifies ground-water sampling events used by PNL for environmental surveillance of the Hanford Site.

  3. A study of the Bienstock-Zuckerberg algorithm, Applications in Mining and Resource Constrained Project Scheduling

    OpenAIRE

    Muñoz, Gonzalo; Espinoza, Daniel; Goycoolea, Marcos; Moreno, Eduardo; Queyranne, Maurice; Rivera, Orlando

    2016-01-01

    We study a Lagrangian decomposition algorithm recently proposed by Dan Bienstock and Mark Zuckerberg for solving the LP relaxation of a class of open pit mine project scheduling problems. In this study we show that the Bienstock-Zuckerberg (BZ) algorithm can be used to solve LP relaxations corresponding to a much broader class of scheduling problems, including the well-known Resource Constrained Project Scheduling Problem (RCPSP), and multi-modal variants of the RCPSP that consider batch proc...

  4. A gain-coefficient switched Alexandrite laser

    International Nuclear Information System (INIS)

    Lee, Chris J; Van der Slot, Peter J M; Boller, Klaus-J

    2013-01-01

    We report on a gain-coefficient switched Alexandrite laser. An electro-optic modulator is used to switch between high and low gain states by making use of the polarization dependent gain of Alexandrite. In gain-coefficient switched mode, the laser produces 85 ns pulses with a pulse energy of 240 mJ at a repetition rate of 5 Hz.

  5. Estimating the potential gains from mergers

    DEFF Research Database (Denmark)

    Bogetoft, Peter; Wang, Dexiang

    2005-01-01

    We introduce simple production economic models to estimate the potential gains from mergers. We decompose the gains into technical ef¿ciency, size (scale) and harmony (mix) gains, and we discuss alternative ways to capture these gains. We propose to approximate the production processes using...

  6. Dynamic and Noise Properties of Tunable Multielectrode Semiconductor Lasers Including Spatial Hole Burning and Nonlinear Gain

    Science.gov (United States)

    1993-03-01

    LASERS WITH UNIFORM INTENSITY :or instance, an increase in electron population due to DISTRIBUTION ýurrent modulation leads to an increase in the output...lasers 1281, the o the spontaneous emission results in a decrease of clcc- field intensity distribution is nearly uniform inside the :on population to...Optics (Academic. 1989). on optical fiber measuremcnts at the Guilin Insti- Dr. Agrawal is a fellow of the Optical Society of America and a member utuc

  7. Fold classification based on secondary structure – how much is gained by including loop topology?

    Directory of Open Access Journals (Sweden)

    Przytycka Teresa

    2006-03-01

    Full Text Available Abstract Background It has been proposed that secondary structure information can be used to classify (to some extend protein folds. Since this method utilizes very limited information about the protein structure, it is not surprising that it has a higher error rate than the approaches that use full 3D fold description. On the other hand, the comparing of 3D protein structures is computing intensive. This raises the question to what extend the error rate can be decreased with each new source of information, especially if the new information can still be used with simple alignment algorithms. We consider the question whether the information about closed loops can improve the accuracy of this approach. While the answer appears to be obvious, we had to overcome two challenges. First, how to code and to compare topological information in such a way that local alignment of strings will properly identify similar structures. Second, how to properly measure the effect of new information in a large data sample. We investigate alternative ways of computing and presenting this information. Results We used the set of beta proteins with at most 30% pairwise identity to test the approach; local alignment scores were used to build a tree of clusters which was evaluated using a new log-odd cluster scoring function. In particular, we derive a closed formula for the probability of obtaining a given score by chance.Parameters of local alignment function were optimized using a genetic algorithm. Of 81 folds that had more than one representative in our data set, log-odds scores registered significantly better clustering in 27 cases and significantly worse in 6 cases, and small differences in the remaining cases. Various notions of the significant change or average change were considered and tried, and the results were all pointing in the same direction. Conclusion We found that, on average, properly presented information about the loop topology improves noticeably the accuracy of the method but the benefits vary between fold families as measured by log-odds cluster score.

  8. Estimating the potential gains from mergers

    DEFF Research Database (Denmark)

    Bogetoft, Peter; Wang, Dexiang

    2005-01-01

    We introduce simple production economic models to estimate the potential gains from mergers. We decompose the gains into technical ef¿ciency, size (scale) and harmony (mix) gains, and we discuss alternative ways to capture these gains. We propose to approximate the production processes using...... the non-parametric. Data Envelopment Analysis (DEA) approach, and we use the resulting operational approach to estimate the potential gains from merging agricultural extension of¿ces in Denmark....

  9. A Heuristic Task Scheduling Algorithm for Heterogeneous Virtual Clusters

    Directory of Open Access Journals (Sweden)

    Weiwei Lin

    2016-01-01

    Full Text Available Cloud computing provides on-demand computing and storage services with high performance and high scalability. However, the rising energy consumption of cloud data centers has become a prominent problem. In this paper, we first introduce an energy-aware framework for task scheduling in virtual clusters. The framework consists of a task resource requirements prediction module, an energy estimate module, and a scheduler with a task buffer. Secondly, based on this framework, we propose a virtual machine power efficiency-aware greedy scheduling algorithm (VPEGS. As a heuristic algorithm, VPEGS estimates task energy by considering factors including task resource demands, VM power efficiency, and server workload before scheduling tasks in a greedy manner. We simulated a heterogeneous VM cluster and conducted experiment to evaluate the effectiveness of VPEGS. Simulation results show that VPEGS effectively reduced total energy consumption by more than 20% without producing large scheduling overheads. With the similar heuristic ideology, it outperformed Min-Min and RASA with respect to energy saving by about 29% and 28%, respectively.

  10. Optimization of Multiperiod Mixed Train Schedule on High-Speed Railway

    Directory of Open Access Journals (Sweden)

    Wenliang Zhou

    2015-01-01

    Full Text Available For providing passengers with periodic operation trains and making trains’ time distribution better fit that of passengers, the multiperiod mixed train schedule is first proposed in this paper. It makes each type of train having same origin, destination, route, and stop stations operate based on a periodic basis and allows different types of train to have various operation periods. Then a model of optimizing multiperiod mixed train schedule is built to minimize passengers generalized travel costs with the constraints of trains of same type operating periodically, safe interval requirements of trains’ departure, and arrival times, and so forth. And its heuristic algorithm is designed to optimize the multiperiod mixed train schedule beginning with generating an initial solution by scheduling all types of train type by type and then repeatedly improving their periodic schedules until the objective value cannot be reduced or the iteration number reaches its maximum. Finally, example results illustrate that the proposed model and algorithm can effectively gain a better multiperiod mixed train schedule. However, its passengers deferred times and advanced times are a little higher than these of an aperiodic train schedule.

  11. A Formal Product-Line Engineering Approach for Schedulers

    NARCIS (Netherlands)

    Orhan, Güner; Aksit, Mehmet; Rensink, Arend; Jololian, Leon; Robbins, David E.; Fernandes, Steven L.

    2017-01-01

    Scheduling techniques have been applied to a large category of software systems, such as, processor scheduling in operating systems, car scheduling in elevator systems, facility scheduling at airports, antenna scheduling in radar systems, scheduling of events, control signals and data in

  12. Content Analysis Schedule for Bilingual Education Programs: Proyecto PAL.

    Science.gov (United States)

    Gonzalez, Castor

    This content analysis schedule for "Proyecto PAL" in San Jose, California, presents information on the history, funding, and scope of the project. Included are sociolinguistic process variables such as the native and dominant languages of students and their interaction. Information is provided on staff selection and the linguistic…

  13. 77 FR 35065 - Records Schedules; Availability and Request for Comments

    Science.gov (United States)

    2012-06-12

    ... send a copy of the schedule. NARA staff usually prepare appraisal memorandums that contain additional... file unit level as well as their disposition. If NARA staff has prepared an appraisal memorandum for..., including general correspondence, reports, studies, plans, audits, case files, interagency...

  14. Irrigation scheduling research: South African experiences and future ...

    African Journals Online (AJOL)

    Many scheduling approaches have been developed with Water Research Commission funding over the past 4 decades and deployed with varying levels of success; 2 approaches have won prestigious international awards. Soil-based approaches which include measurement of matric potential (tensiometry), water content ...

  15. Interval algebra: an effective means of scheduling surveillance radar networks

    CSIR Research Space (South Africa)

    Focke, RW

    2015-05-01

    Full Text Available Interval Algebra provides an effective means to schedule surveillance radar networks, as it is a temporal ordering constraint language. Thus it provides a solution to a part of resource management, which is included in the revised Data Fusion...

  16. Heuristic algorithms for scheduling heat-treatment furnaces of steel ...

    Indian Academy of Sciences (India)

    on job-mixes in addition to the usual capacity and technical constraints associated with any industrial process. The benefits of effective scheduling of these batch processes include higher machine utilization, lower work-in-process (WIP) inventory, shorter cycle time, and greater customer satisfaction (Pinedo 1995). Recently ...

  17. Personnel Management Training Center: Course Schedule, Fiscal Year 1973.

    Science.gov (United States)

    Civil Service Commission, Washington, DC. Bureau of Training.

    The Personnel Management Training Center's Course Schedule for Fiscal Year 1973 lists all courses available to government employees. Interagency training programs include courses in employee relations, counseling, personnel management, and instructor training. Courses are also offered by the Equal Employment Opportunity Training Institute, and…

  18. A Principal Components Analysis of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Law, H. G.; And Others

    1979-01-01

    Investigated the adequacy of the Rathus Assertiveness Schedule (RAS) as a global measure of assertiveness. Analysis indicated that the RAS does not provide a unidimensional index of assertiveness, but rather measures a number of factors including situation-specific assertive behavior, aggressiveness, and a more general assertiveness. (Author)

  19. 14 CFR 420.55 - Scheduling of launch site operations.

    Science.gov (United States)

    2010-01-01

    ... procedures to schedule operations to ensure that each operation carried out by a customer at the launch site does not create the potential for a mishap that could result in harm to the public because of the proximity of the operations, in time or place, to operations of any other customer. A customer includes any...

  20. Do the Math: Course Redesign's Impact on Learning and Scheduling

    Science.gov (United States)

    Squires, John; Faulkner, Jerry; Hite, Carl

    2009-01-01

    The math department at Cleveland State Community College embarked upon course redesign in 2008. As a result of this project, student engagement, learning, and success rates have increased dramatically. By including both developmental and college level math courses in the redesign, the department has been able to implement innovative scheduling and…

  1. Scheduling Scholarship: Promoting Faculty Engagement in Two-Year Colleges

    Science.gov (United States)

    Lightner, Robin; Sipple, Susan

    2013-01-01

    Campuses can reinvigorate faculty by helping them make time for sustained, in-depth professional development. Scheduling scholarship in the form of on-going, long-term faculty learning communities (FLCs) link work in the classroom with research and reflection. The benefits of FLCs to two-year colleges include decreased isolation, intellectual…

  2. The ASDEX Upgrade discharge schedule

    International Nuclear Information System (INIS)

    Neu, G.; Engelhardt, K.; Raupp, G.; Treutterer, W.; Zasche, D.; Zehetbauer, T.

    2007-01-01

    ASDEX Upgrade's recently commissioned discharge control system (DCS) marks the transition from a traditional programmed system to a highly flexible 'data driven' one. The allocation of application processes (APs) to controllers, the interconnection of APs through uniquely named signals, and AP control parameter values are all defined as data, and can easily be adapted to the requirements of a particular discharge. The data is laid down in a set of XML documents which APs request via HTTP from a configuration server before a discharge. The use of XML allows for easy parsing, and structural validation through (XSD) schemas. The central input to the configuration process is the discharge schedule (DS), which embodies the dynamic behaviour of a planned discharge as reference trajectories grouped in segments, concatenated through transition conditions. Editing, generation and validation tools, and version control through CVS allow for efficient management of DSs

  3. The delivery commitment schedule process

    International Nuclear Information System (INIS)

    Vance, S.A.

    1991-01-01

    The Standard Contract for the Disposal of Spent Nuclear Fuel (SNF) and/or High-Level Radioactive Waste (HLW) (herein referred to as the Contract) tasked the U.S. Department of Energy (DOE) with the development of a transportation system adequate to service both utilities and the waste management system (WMS). Due to the nature of the Contract, this development must take place prior to the utilities' final determination of the specific SNF that they will deliver during each allocation period. The Delivery Commitment Schedule (DCS) process is designed to initiate the identification of the SNF that will be delivered at a given time in order to aid in the development of the transportation system

  4. Analysis of Feeder Bus Network Design and Scheduling Problems

    Directory of Open Access Journals (Sweden)

    Mohammad Hadi Almasi

    2014-01-01

    Full Text Available A growing concern for public transit is its inability to shift passenger’s mode from private to public transport. In order to overcome this problem, a more developed feeder bus network and matched schedules will play important roles. The present paper aims to review some of the studies performed on Feeder Bus Network Design and Scheduling Problem (FNDSP based on three distinctive parts of the FNDSP setup, namely, problem description, problem characteristics, and solution approaches. The problems consist of different subproblems including data preparation, feeder bus network design, route generation, and feeder bus scheduling. Subsequently, descriptive analysis and classification of previous works are presented to highlight the main characteristics and solution methods. Finally, some of the issues and trends for future research are identified. This paper is targeted at dealing with the FNDSP to exhibit strategic and tactical goals and also contributes to the unification of the field which might be a useful complement to the few existing reviews.

  5. Analysis of feeder bus network design and scheduling problems.

    Science.gov (United States)

    Almasi, Mohammad Hadi; Mirzapour Mounes, Sina; Koting, Suhana; Karim, Mohamed Rehan

    2014-01-01

    A growing concern for public transit is its inability to shift passenger's mode from private to public transport. In order to overcome this problem, a more developed feeder bus network and matched schedules will play important roles. The present paper aims to review some of the studies performed on Feeder Bus Network Design and Scheduling Problem (FNDSP) based on three distinctive parts of the FNDSP setup, namely, problem description, problem characteristics, and solution approaches. The problems consist of different subproblems including data preparation, feeder bus network design, route generation, and feeder bus scheduling. Subsequently, descriptive analysis and classification of previous works are presented to highlight the main characteristics and solution methods. Finally, some of the issues and trends for future research are identified. This paper is targeted at dealing with the FNDSP to exhibit strategic and tactical goals and also contributes to the unification of the field which might be a useful complement to the few existing reviews.

  6. Optimization of Hierarchically Scheduled Heterogeneous Embedded Systems

    DEFF Research Database (Denmark)

    Pop, Traian; Pop, Paul; Eles, Petru

    2005-01-01

    We present an approach to the analysis and optimization of heterogeneous distributed embedded systems. The systems are heterogeneous not only in terms of hardware components, but also in terms of communication protocols and scheduling policies. When several scheduling policies share a resource......, they are organized in a hierarchy. In this paper, we address design problems that are characteristic to such hierarchically scheduled systems: assignment of scheduling policies to tasks, mapping of tasks to hardware components, and the scheduling of the activities. We present algorithms for solving these problems....... Our heuristics are able to find schedulable implementations under limited resources, achieving an efficient utilization of the system. The developed algorithms are evaluated using extensive experiments and a real-life example....

  7. PRACTICAL IMPLICATIONS OF LOCATION-BASED SCHEDULING

    DEFF Research Database (Denmark)

    Andersson, Niclas; Christensen, Knud

    2007-01-01

    The traditional method for planning, scheduling and controlling activities and resources in construction projects is the CPM-scheduling, which has been the predominant scheduling method since its introduction in the late 1950s. Over the years, CPM has proven to be a very powerful technique...... for planning, scheduling and controlling projects. However, criticism has been raised on the CPM method, specifically in the case of construction projects, for deficient management of construction work and discontinuous flow of resources. Alternative scheduling techniques, often called repetitive or linear...... that will be used in this study. LBS is a scheduling method that rests upon the theories of line-of-balance and which uses the graphic representation of a flowline chart. As such, LBS is adapted for planning and management of workflows and, thus, may provide a solution to the identified shortcomings of CPM. Even...

  8. Enhanced OTSG economics optimizing CAPEX + OPEX + Schedule

    Energy Technology Data Exchange (ETDEWEB)

    Armstrong, Peter [KTI Engineered to Perform (Canada)

    2011-07-01

    This presentation gives an insight into the economics involved in producing once-through steam (OTSG) generators in Canada and it offers a proposal for improving returns in the industry. The objective of this presentation was to show the importance of developing OTSG manufacturing based on the future of this technology. The growing demand for OTSG by oil companies was presented, suggesting that this is a good time to put effort into developing more efficient designs. After the background of this technology was discussed, several economical aspects of the process were addressed; for instance, reducing capital expenditure (CAPEX) and operation expenditure (OPEX), outsourcing production, and project scheduling and execution. Initiatives proposed included: reducing plot size, producing larger OTSGs, reducing downtime, using alternative fuels, forming a global manufacturing network, and avoiding order blockage. Finally, the idea of designing a portable OTSG was proposed, showing its flexibility in oil extraction projects.

  9. Spent nuclear fuel project integrated schedule plan

    International Nuclear Information System (INIS)

    Squires, K.G.

    1995-01-01

    The Spent Nuclear Fuel Integrated Schedule Plan establishes the organizational responsibilities, rules for developing, maintain and status of the SNF integrated schedule, and an implementation plan for the integrated schedule. The mission of the SNFP on the Hanford site is to provide safe, economic, environmentally sound management of Hanford SNF in a manner which stages it to final disposition. This particularly involves K Basin fuel

  10. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors

    OpenAIRE

    Zilanawala, A.

    2017-01-01

    Objectives: Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9–5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Co...

  11. Rethinking the Clockwork of Work: Why Schedule Control May Pay Off at Work and at Home.

    Science.gov (United States)

    Kelly, Erin L; Moen, Phyllis

    2007-11-01

    Many employees face work-life conflicts and time deficits that negatively affect their health, well-being, effectiveness on the job, and organizational commitment. Many organizations have adopted flexible work arrangements but not all of them increase schedule control, that is, employees' control over when, where, and how much they work. This article describes some limitations of flexible work policies, proposes a conceptual model of how schedule control impacts work-life conflicts, and describes specific ways to increase employees' schedule control, including best practices for implementing common flexible work policies and Best Buy's innovative approach to creating a culture of schedule control.

  12. Gain attenuation of gated framing camera

    International Nuclear Information System (INIS)

    Xiao Shali; Liu Shenye; Cao Zhurong; Li Hang; Zhang Haiying; Yuan Zheng; Wang Liwei

    2009-01-01

    The theoretic model of framing camera's gain attenuation is analyzed. The exponential attenuation curve of the gain along the pulse propagation time is simulated. An experiment to measure the coefficient of gain attenuation based on the gain attenuation theory is designed. Experiment result shows that the gain follows an exponential attenuation rule with a quotient of 0.0249 nm -1 , the attenuation coefficient of the pulse is 0.00356 mm -1 . The loss of the pulse propagation along the MCP stripline is the leading reason of gain attenuation. But in the figure of a single stripline, the gain dose not follow the rule of exponential attenuation completely, instead, there is a gain increase at the stripline bottom. That is caused by the reflection of the pulse. The reflectance is about 24.2%. Combining the experiment and theory, which design of the stripline MCP can improved the gain attenuation. (authors)

  13. A customizable, scalable scheduling and reporting system.

    Science.gov (United States)

    Wood, Jody L; Whitman, Beverly J; Mackley, Lisa A; Armstrong, Robert; Shotto, Robert T

    2014-06-01

    Scheduling is essential for running a facility smoothly and for summarizing activities in use reports. The Penn State Hershey Clinical Simulation Center has developed a scheduling interface that uses off-the-shelf components, with customizations that adapt to each institution's data collection and reporting needs. The system is designed using programs within the Microsoft Office 2010 suite. Outlook provides the scheduling component, while the reporting is performed using Access or Excel. An account with a calendar is created for the main schedule, with separate resource accounts created for each room within the center. The Outlook appointment form's 2 default tabs are used, in addition to a customized third tab. The data are then copied from the calendar into either a database table or a spreadsheet, where the reports are generated.Incorporating this system into an institution-wide structure allows integration of personnel lists and potentially enables all users to check the schedule from their desktop. Outlook also has a Web-based application for viewing the basic schedule from outside the institution, although customized data cannot be accessed. The scheduling and reporting functions have been used for a year at the Penn State Hershey Clinical Simulation Center. The schedule has increased workflow efficiency, improved the quality of recorded information, and provided more accurate reporting. The Penn State Hershey Clinical Simulation Center's scheduling and reporting system can be adapted easily to most simulation centers and can expand and change to meet future growth with little or no expense to the center.

  14. BIM-BASED SCHEDULING OF CONSTRUCTION

    DEFF Research Database (Denmark)

    Andersson, Niclas; Büchmann-Slorup, Rolf

    2010-01-01

    The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...

  15. Taking the lag out of jet lag through model-based schedule design.

    Science.gov (United States)

    Dean, Dennis A; Forger, Daniel B; Klerman, Elizabeth B

    2009-06-01

    Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  16. Taking the lag out of jet lag through model-based schedule design.

    Directory of Open Access Journals (Sweden)

    Dennis A Dean

    2009-06-01

    Full Text Available Travel across multiple time zones results in desynchronization of environmental time cues and the sleep-wake schedule from their normal phase relationships with the endogenous circadian system. Circadian misalignment can result in poor neurobehavioral performance, decreased sleep efficiency, and inappropriately timed physiological signals including gastrointestinal activity and hormone release. Frequent and repeated transmeridian travel is associated with long-term cognitive deficits, and rodents experimentally exposed to repeated schedule shifts have increased death rates. One approach to reduce the short-term circadian, sleep-wake, and performance problems is to use mathematical models of the circadian pacemaker to design countermeasures that rapidly shift the circadian pacemaker to align with the new schedule. In this paper, the use of mathematical models to design sleep-wake and countermeasure schedules for improved performance is demonstrated. We present an approach to designing interventions that combines an algorithm for optimal placement of countermeasures with a novel mode of schedule representation. With these methods, rapid circadian resynchrony and the resulting improvement in neurobehavioral performance can be quickly achieved even after moderate to large shifts in the sleep-wake schedule. The key schedule design inputs are endogenous circadian period length, desired sleep-wake schedule, length of intervention, background light level, and countermeasure strength. The new schedule representation facilitates schedule design, simulation studies, and experiment design and significantly decreases the amount of time to design an appropriate intervention. The method presented in this paper has direct implications for designing jet lag, shift-work, and non-24-hour schedules, including scheduling for extreme environments, such as in space, undersea, or in polar regions.

  17. Day-ahead resource scheduling including demand response for electric vehicles

    DEFF Research Database (Denmark)

    Soares, Joao; Morais, Hugo; Sousa, Tiago

    2014-01-01

    the intensive use of distributed generation and V2G. The main focus is the comparison of different EV management approaches in the day-ahead energy resources management, namely uncontrolled charging, smart charging, V2G and Demand Response (DR) programs in the V2G approach. Three different DR programs...

  18. 17 CFR 210.5-04 - What schedules are to be filed.

    Science.gov (United States)

    2010-04-01

    ... ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Commercial and Industrial Companies... valuation and qualifying accounts included in each balance sheet but not included in Schedule VI. (See § 210...

  19. Pump apparatus including deconsolidator

    Energy Technology Data Exchange (ETDEWEB)

    Sonwane, Chandrashekhar; Saunders, Timothy; Fitzsimmons, Mark Andrew

    2014-10-07

    A pump apparatus includes a particulate pump that defines a passage that extends from an inlet to an outlet. A duct is in flow communication with the outlet. The duct includes a deconsolidator configured to fragment particle agglomerates received from the passage.

  20. Irrigation scheduling and controlling crop water use efficiency with Infrared Thermometry

    Science.gov (United States)

    Scientific methods for irrigation scheduling include weather, soil and plant-based techniques. Infrared thermometers can be used a non-invasive practice to monitor canopy temperature and better manage irrigation scheduling. This presentation will discuss the theoretical basis for monitoring crop can...

  1. Compositional schedulability analysis of real-time actor-based systems

    NARCIS (Netherlands)

    Jaghoori, Mohammad Mahdi; de Boer, Frank; Longuet, Delphine; Chothia, Tom; Sirjani, Marjan

    2017-01-01

    We present an extension of the actor model with real-time, including deadlines associated with messages, and explicit application-level scheduling policies, e.g.,"earliest deadline first" which can be associated with individual actors. Schedulability analysis in this setting amounts to checking

  2. Family Roles as Moderators of the Relationship between Schedule Flexibility and Stress

    Science.gov (United States)

    Jang, Soo Jung; Zippay, Allison; Park, Rhokeun

    2012-01-01

    Employer initiatives that address the spillover of work strain onto family life include flexible work schedules. This study explored the mediating role of negative work-family spillover in the relationship between schedule flexibility and employee stress and the moderating roles of gender, family workload, and single-parent status. Data were drawn…

  3. Choice between Single and Multiple Reinforcers in Concurrent-Chains Schedules

    Science.gov (United States)

    Mazur, James E.

    2006-01-01

    Pigeons responded on concurrent-chains schedules with equal variable-interval schedules as initial links. One terminal link delivered a single reinforcer after a fixed delay, and the other terminal link delivered either three or five reinforcers, each preceded by a fixed delay. Some conditions included a postreinforcer delay after the single…

  4. A Comparison between Fixed Priority and EDF Scheduling accounting for Cache Related Pre-emption Delays

    NARCIS (Netherlands)

    Lunniss, W.; Altmeyer, S.; Davis, R.I.

    2014-01-01

    In multitasking real-time systems, the choice of scheduling algorithm is an important factor to ensure that response time requirements are met while maximising limited system resources. Two popular scheduling algorithms include fixed priority (FP) and earliest deadline first (EDF). While they have

  5. 5 CFR 532.279 - Special wage schedules for printing positions.

    Science.gov (United States)

    2010-01-01

    ... the printing survey as follows: (1) The lead agency must include North American Industry... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Special wage schedules for printing... printing positions. (a) The lead agency in a special printing schedule area listed in paragraph (j) of this...

  6. Optical modulator including grapene

    Science.gov (United States)

    Liu, Ming; Yin, Xiaobo; Zhang, Xiang

    2016-06-07

    The present invention provides for a one or more layer graphene optical modulator. In a first exemplary embodiment the optical modulator includes an optical waveguide, a nanoscale oxide spacer adjacent to a working region of the waveguide, and a monolayer graphene sheet adjacent to the spacer. In a second exemplary embodiment, the optical modulator includes at least one pair of active media, where the pair includes an oxide spacer, a first monolayer graphene sheet adjacent to a first side of the spacer, and a second monolayer graphene sheet adjacent to a second side of the spacer, and at least one optical waveguide adjacent to the pair.

  7. Circuit Model of Gain in Metamaterials

    Science.gov (United States)

    Boardman, Allan D.; King, Neil; Rapoport, Yuriy

    Metamaterials embody exciting prospects for a new generation of novel photonic devices. From their initial emergence as a physical construct in the GHz domain at the start of the 21st century [1-3], they have attracted a significant amount of global interest [4-13] with considerable effort being undertaken to extend their operation into the THz window and even optical regimes [14,15]. However, as they stand, early theoretical indications are that losses will cause potential problems for all possible frequencies and, in particular, kill any opportunity [16] for a useful metamaterial operating around and above 30THz. Such losses are inevitably closely linked to the resonant behaviour of the metaparticles and is addressed here by the placement of active diodes onto a form of metallic split-ring. The use of diodes to create a nonlinear magnetic response [16] and to create tunability [17] has already been discussed but active diodes [18] not only promise means of reducing losses but they can be deployed to produce an overall gain [19]. This behaviour is readily scalable from GHz to THz and even to nanowire [20] and nanoparticle-based metamaterials [21] operating in the optical frequency window. Nevertheless, it is highlighted here that instabilities could present a serious issue. From an investigation of the dispersion relation for a plane wave, a number of conditions are derived that identify the limits placed upon the system parameters, in order to ensure stable overall gain. Any examination of loss, or gain, must, however, be conducted from the perspective of the entire metamaterial, including the permittivity. Depending on the level of sophistication required in the fabrication technique, split-rings may be engineered with different shapes and deployed in a number of different arrays. The most popular have either a circular, or square shape. The term "split-ring" is treated here as a generic name and is not necessarily indicative of a specific shape.

  8. National contingency plan product schedule data base

    International Nuclear Information System (INIS)

    Putukian, J.; Hiltabrand, R.R.

    1993-01-01

    During oil spills there are always proposals by the technical community and industry to use chemical agents to help in oil spill cleanups. Federal Clean Water Act regulations require that any chemical agents that the federal on-scene coordinator (FOSC) wants to use for oil cleanup be listed on the US Environmental Protection Agency (EPA) National Contingency Plan (NCP) Product Schedule. Chemical countermeasures are among the most controversial, complex, and time-critical issues facing decision-making officials choosing response methods to use on coastal oil spills. There are situations in which dispersants are likely to be one of the most appropriate counter-measure strategies. Dispersants are most effective when applied to fresh oil, and their effectiveness dramatically decreases as the oil weathers, which can begin in as little as 24 hours. To logistically implement dispersant use, a decision would need to be made within roughly the first 4 hours after the release. Most of the information that the FOSC needs to make the determination to use a specific chemical agent exists in manuals, EPA bulletins, and the published literature. This information is not in an easy-to-use format under field emergency conditions. Hence the need to collect and disseminate the information in an automated data base. The sources for the information in this data base are the following. Published results of tests performed by Environment Canada; EPA bulletins associated with the NCP Product Schedule; Published results of tests by the chemical industry. The data base resides on a Macintosh computer and contains information about 70 NCP products, including dispersants, surface collecting agents, and biological additives. It contains information on physical properties, toxicity, heavy metal content, safety precautions, use conditions, etc

  9. Can Beta Blockers Cause Weight Gain?

    Science.gov (United States)

    Beta blockers: Do they cause weight gain? Can beta blockers cause weight gain? Answers from Sheldon G. ... can occur as a side effect of some beta blockers, especially the older ones, such as atenolol ( ...

  10. Packet-Scheduling Algorithm by the Ratio of Transmit Power to the Transmission Bits in 3GPP LTE Downlink

    Directory of Open Access Journals (Sweden)

    Gil Gye-Tae

    2010-01-01

    Full Text Available Packet scheduler plays the central role in determining the overall performance of the 3GPP long-term evolution (LTE based on packet-switching operation. In this paper, a novel minimum transmit power-based (MP packet-scheduling algorithm is proposed that can achieve power-efficient transmission to the UEs while providing both system throughput gain and fairness improvement. The proposed algorithm is based on a new scheduling metric focusing on the ratio of the transmit power per bit and allocates the physical resource block (PRB to the UE that requires the least ratio of the transmit power per bit. Through computer simulation, the performance of the proposed MP packet-scheduling algorithm is compared with the conventional packet-scheduling algorithms by two primary criteria: fairness and throughput. The simulation results show that the proposed algorithm outperforms the conventional algorithms in terms of the fairness and throughput.

  11. 29 CFR 825.203 - Scheduling of intermittent or reduced schedule leave.

    Science.gov (United States)

    2010-07-01

    ... leave intermittently or on a reduced leave schedule for planned medical treatment, then the employee... 29 Labor 3 2010-07-01 2010-07-01 false Scheduling of intermittent or reduced schedule leave. 825... OF LABOR OTHER LAWS THE FAMILY AND MEDICAL LEAVE ACT OF 1993 Employee Leave Entitlements Under the...

  12. Designing cyclic appointment schedules for outpatient clinics with scheduled and unscheduled patient arrivals

    NARCIS (Netherlands)

    Kortbeek, Nikky; Zonderland, Maartje Elisabeth; Braaksma, Aleida; Vliegen, Ingrid M.H.; Boucherie, Richardus J.; Litvak, Nelli; Hans, Elias W.

    2014-01-01

    We present a methodology to design appointment systems for outpatient clinics and diagnostic facilities that offer both walk-in and scheduled service. The developed blueprint for the appointment schedule prescribes the number of appointments to plan per day and the moment on the day to schedule the

  13. Incremental Scheduling Engines: Cost Savings through Automation

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and ob.jectives are met and resources are not over-booked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper, presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks and those of their companion robots.

  14. Appointment scheduling with unscheduled arrivals and reprioritization

    NARCIS (Netherlands)

    Borgman, Nardo J.; Vliegen, Ingrid M.H.; Boucherie, Richard J.; Hans, Erwin W.

    2017-01-01

    Inspired by the real life problem of a radiology department in a Dutch hospital, we study the problem of scheduling appointments, taking into account unscheduled arrivals and reprioritization. The radiology department offers CT diagnostics to both scheduled and unscheduled patients. Of these

  15. Stochastic Online Scheduling on Unrelated Machines

    NARCIS (Netherlands)

    Gupta, Varun; Moseley, Benjamin; Uetz, Marc Jochen; Xie, Qiaomin

    2016-01-01

    We derive the first performance guarantees for a combinatorial online algorithm that schedules stochastic, nonpreemptive jobs on unrelated machines to minimize the expectation of the total weighted completion time. Prior work on unrelated machine scheduling with stochastic jobs was restricted to the

  16. Scheduling parameters in flexible manufacturing cells

    NARCIS (Netherlands)

    Slomp, J.; Gaalman, G.J.C.; Ahmad, M.M.; Sullivan, W.G.; Migliore, H.; Randhawa, S.

    1998-01-01

    The existence of a well-designed scheduling procedure is a major condition for an effective integration of a flexible manufacturing cell (FMC) in the material flow of a firm. This paper shows the presence and relative importance of three parameter types in the scheduling of operations on a flexible

  17. State Teacher Salary Schedules. Policy Analysis

    Science.gov (United States)

    Griffith, Michael

    2016-01-01

    In the United States most teacher compensation issues are decided at the school district level. However, a group of states have chosen to play a role in teacher pay decisions by instituting statewide teacher salary schedules. Education Commission of the States has found that 17 states currently make use of teacher salary schedules. This education…

  18. A Case Against Periodic Jukebox Scheduling

    NARCIS (Netherlands)

    Lijding, M.E.M.; Hanssen, F.T.Y.; Jansen, P.G.

    This paper presents the jukebox early quantum scheduler (JEQS). JEQS is a periodic jukebox scheduler for a Video-on-Demand system. JEQS uses the jukebox robots in a cyclic way and the time is divided in constant units called quanta. A quantum is the maximum time needed to unload and load all the

  19. Crew Scheduling for Netherlands Railways: "destination: customer"

    NARCIS (Netherlands)

    L.G. Kroon (Leo); M. Fischetti (Matteo)

    2000-01-01

    textabstract: In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer"

  20. DEVELOPMENT OF A MAINTENANCE SCHEDULING MODEL FOR ...

    African Journals Online (AJOL)

    The method is capable of stating the overhaul frequency of each machine within this time period. For convenience in the formulation of the model, maintenance schedule was divided into two parts, namely minor and major maintenance schedules. During a minor maintenance, an individual machine is checked and reset, ...

  1. A Heuristic Approach to Scheduling University Timetables.

    Science.gov (United States)

    Loo, E. H.; And Others

    1986-01-01

    Categories of facilities utilization and scheduling requirements to be considered when using a heuristic approach to timetabling are described together with a nine-step algorithm and the computerized timetabling system, Timetable Schedules System (TTS); TTS utilizes heuristic approach. An example demonstrating use of TTS and a program flowchart…

  2. 5 CFR 950.801 - Campaign schedule.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Campaign schedule. 950.801 Section 950... VOLUNTARY ORGANIZATIONS CFC Timetable § 950.801 Campaign schedule. (a) The Combined Federal Campaign will be.../International and International parts of the Charity List to all local campaigns by a date to be determined by...

  3. Unrelated Machine Scheduling with Stochastic Processing Times

    NARCIS (Netherlands)

    Skutella, Martin; Sviridenko, Maxim; Uetz, Marc Jochen

    Two important characteristics encountered in many real-world scheduling problems are heterogeneous processors and a certain degree of uncertainty about the processing times of jobs. In this paper we address both, and study for the first time a scheduling problem that combines the classical unrelated

  4. Machine scheduling with resource dependent processing times

    NARCIS (Netherlands)

    Grigoriev, A.; Sviridenko, M.; Uetz, Marc Jochen

    We consider machine scheduling on unrelated parallel machines with the objective to minimize the schedule makespan. We assume that, in addition to its machine dependence, the processing time of any job is dependent on the usage of a discrete renewable resource, e.g. workers. A given amount of that

  5. Agent-based scheduling for aircraft deicing

    NARCIS (Netherlands)

    Mao, X.; Ter Mors, A.W.; Roos, N.; Witteveen, C.

    2006-01-01

    The planning and scheduling of the deicing and anti-icing activities is an important and challenging part of airport departure planning. Deicing planning has to be done in a highly dynamic environment involving several autonomous and self-interested parties. Traditional centralized scheduling

  6. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction and Schedule After nearly seven months of concentrated effort, the installation of services on YB0 moved off the CMS critical path in late November. In line with v36 planning provisions, the additional time needed to finish this challeng¬ing task was accommodated by reducing sequential dependencies between assembly tasks, putting more tasks (especially heavy logistic movements) in parallel with activities on, or within, the central wheel. Thus the lowering of wheels YB-1 and YB -2 and of disk YE-3 is already complete, the latter made possible, in the shadow of YB0 work, by inverting the order of the 3 endcap disks in the surface building. Weather conditions permitting, the Tracker will be transported to point 5 during CMS week for insertion in EB before CERN closes. The lowering of the last two disks will take place mid- and end-of January, respectively. Thus central beampipe installation can be confidently planned to start in February as foreseen, allowing closure of CMS in time for CRA...

  7. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Multimedia

    A. Ball

    Introduction Despite the holiday season affecting available manpower, many key internal milestones have been passed over the summer, thanks to the dedication and commitment of the team at point 5. In particular, the installation on, and within, YB0 has progressed steadily through several potentially difficult phases. The v36 planning contingency of lowering YB-1 and YB-1 wheels on schedule in October, before Tracker installation, will be executed in order to give more time to complete YB0 services work, whilst still being consistent with completion of heavy lowering by the end of 2007. Safety In the underground areas the peak level of activity and parallel work has been reached and this will continue for the coming months. Utmost vigilance is required of everybody working underground and this must be maintained. However, it is encouraging to note that the compliance with safety rules is, in general, good. More and more work will be carried out from scaffolding and mobile access platforms. (cherry-picke...

  8. TECHNICAL COORDINATION, SCHEDULE AND INTEGRATION

    CERN Document Server

    A. Ball

    Introduction Since the lowering of YB0 in February, less spectacular but nonetheless crucial progress has been made along the critical path to CMS completion. The YB0 has been aligned with the beamline to a fraction of a mm, and the HCAL has been fully installed. Cabling scaffolding for YB0 services has been built and one half (-z end) of the ECAL barrel has been installed. The YB0 services installation has begun, with two of the major technical challenges delaying bulk installation, namely PP1 detailed design, manufacture and installation plus Tracker cooling pipe insulation, now apparently solved. Significant difficulties in detailed design, integration and procurement of cable ducts remain. Despite this, the design of the +end is close to complete, and Tracker power cable installation on two sectors of the +end is well advanced. A new master schedule, v36.0, is being prepared to account for the updated actual situation at point 5 and for the revised LHC machine planning. Safety The enormous amount of...

  9. Scheduling mammograms for asymptomatic women

    International Nuclear Information System (INIS)

    Gohagan, J.K.; Darby, W.P.; Spitznagel, E.L.; Tome, A.E.

    1988-01-01

    A decision theoretic model was used to investigate the relative importance of risk level, radiation hazard, mammographic accuracy, and cost in mammographic screening decision. The model uses woman-specific medical and family history facts and clinic-specific information regarding mammographic accuracy and practice to profile both woman and clinic, and to formulate periodic screening recommendations. Model parameters were varied extensively to investigate the sensitivity of screening schedules to input values. Multivariate risk was estimated within the program using published data from the Breast Cancer Detection Demonstration Project 5-year follow-up study. Radiation hazard estimates were developed from published radiation physics and radioepidemiologic risk data. Benchmark values for mammographic sensitivity and specificity under screening conditions were calculated from Breast Cancer Detection Demonstration Project data. Procedural costs used in the analysis were varied around values reflecting conditions at the Washington University Medical Center. Mortality advantages of early versus late breast cancer detection were accounted for using Health Insurance Plan of New York case survival rates. Results are compared with published screening policies to provide insight into implicit assumptions behind those policies. This analysis emphasizes the importance of accounting for variations in clinical accuracy under screening circumstances, in costs, in radiation exposure, and in woman-specific risk when recommending mammographic screening

  10. Multimodal processes scheduling in mesh-like network environment

    Directory of Open Access Journals (Sweden)

    Bocewicz Grzegorz

    2015-06-01

    Full Text Available Multimodal processes planning and scheduling play a pivotal role in many different domains including city networks, multimodal transportation systems, computer and telecommunication networks and so on. Multimodal process can be seen as a process partially processed by locally executed cyclic processes. In that context the concept of a Mesh-like Multimodal Transportation Network (MMTN in which several isomorphic subnetworks interact each other via distinguished subsets of common shared intermodal transport interchange facilities (such as a railway station, bus station or bus/tram stop as to provide a variety of demand-responsive passenger transportation services is examined. Consider a mesh-like layout of a passengers transport network equipped with different lines including buses, trams, metro, trains etc. where passenger flows are treated as multimodal processes. The goal is to provide a declarative model enabling to state a constraint satisfaction problem aimed at multimodal transportation processes scheduling encompassing passenger flow itineraries. Then, the main objective is to provide conditions guaranteeing solvability of particular transport lines scheduling, i.e. guaranteeing the right match-up of local cyclic acting bus, tram, metro and train schedules to a given passengers flow itineraries.

  11. 75 FR 63763 - Program Integrity: Gainful Employment

    Science.gov (United States)

    2010-10-18

    ... CFR Part 668 RIN 1840-AD04 Program Integrity: Gainful Employment AGENCY: Office of Postsecondary... Proposed Rulemaking on Program Integrity: Gainful Employment, published in the Federal Register on July 26... determining whether a postsecondary educational program provides training that leads to gainful employment in...

  12. Maternal Weight Gain Biosocial Characteristics And Perinatal ...

    African Journals Online (AJOL)

    Two perinatal deaths occurred, with a perinatal mortality rate of 9.52/ 1000.Their mother's weight gains were not attributable to the deaths. Conclusion The study has shown that parity and social class significantly affect maternal weight gain in pregnancy. Even though the mean weight gain in this study was 8.58 ± 3.61kg, ...

  13. The Flynn effect in Korea: Large gains

    NARCIS (Netherlands)

    te Nijenhuis, J.; Cho, S.H.; Murphy, R.; Lee, K.H.

    2012-01-01

    Secular gains in IQ test scores have been reported for many Western countries. This is the first study of secular IQ gains in South Korea, using various datasets. The first question is what the size of the Flynn effect in South Korea is. The gains per decade are 7.7 points for persons born between

  14. Improved utilization and responsiveness with gang scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Feitelson, D.G., [Institute of Computer Science, The Hebrew University of Jerusalem (IsraelL); Jette, M.A. [Lawrence Livermore National Lab., CA (United States)

    1996-10-01

    Most commercial multicomputers use space-slicing schemes in which each scheduling decision has an unknown impact on the future: should a job be scheduled, risking that it will block other larger jobs later, or should the processors be left idle for now in anticipation of future arrivals? This dilemma is solved by using gang scheduling, because then the impact of each decision is limited to its time slice, and future arrivals can be accommodated in other time slices. This added flexibility is shown to improve overall system utilization and responsiveness. Empirical evidence from using gang scheduling on a Cray T3D installed at Lawrence Livermore National Lab corroborates these results, and shows conclusively that gang scheduling can be very effective with current technology. 29 refs., 10 figs., 6 tabs.

  15. Gain Enhanced LTCC System-on-Package for UMRR Applications

    KAUST Repository

    Shamim, Atif

    2014-10-14

    An apparatus, system, and method for Gain Enhanced LTCC System-on-Package radar sensor. The sensor includes a substrate and an integrated circuit coupled to the substrate, where the integrated circuit is configured to transmit and receive radio frequency (RF) signals. An antenna may be coupled to the integrated circuit and a lens may be coupled to the antenna. The lens may be configured to enhance the gain of the sensor.

  16. A Case Study of Line-of-Balance based Schedule Planning and Control System

    OpenAIRE

    Seppänen, Olli; Aalto, Erno

    2005-01-01

    Line-of-Balance is a graphical technique which can be used to plan and manage work flow. It is suit-able for construction projects because of their large degree of repetition. Despite its strengths Line-of-Balance has not gained widespread use in construction industry internationally. However, it has been used as the principal scheduling tool in Finland since 1980s. As a result of two decades of research and use in industry, a comprehensive schedule planning and control system has been develo...

  17. Optimal load scheduling in commercial and residential microgrids

    Science.gov (United States)

    Ganji Tanha, Mohammad Mahdi

    Residential and commercial electricity customers use more than two third of the total energy consumed in the United States, representing a significant resource of demand response. Price-based demand response, which is in response to changes in electricity prices, represents the adjustments in load through optimal load scheduling (OLS). In this study, an efficient model for OLS is developed for residential and commercial microgrids which include aggregated loads in single-units and communal loads. Single unit loads which include fixed, adjustable and shiftable loads are controllable by the unit occupants. Communal loads which include pool pumps, elevators and central heating/cooling systems are shared among the units. In order to optimally schedule residential and commercial loads, a community-based optimal load scheduling (CBOLS) is proposed in this thesis. The CBOLS schedule considers hourly market prices, occupants' comfort level, and microgrid operation constraints. The CBOLS' objective in residential and commercial microgrids is the constrained minimization of the total cost of supplying the aggregator load, defined as the microgrid load minus the microgrid generation. This problem is represented by a large-scale mixed-integer optimization for supplying single-unit and communal loads. The Lagrangian relaxation methodology is used to relax the linking communal load constraint and decompose the independent single-unit functions into subproblems which can be solved in parallel. The optimal solution is acceptable if the aggregator load limit and the duality gap are within the bounds. If any of the proposed criteria is not satisfied, the Lagrangian multiplier will be updated and a new optimal load schedule will be regenerated until both constraints are satisfied. The proposed method is applied to several case studies and the results are presented for the Galvin Center load on the 16th floor of the IIT Tower in Chicago.

  18. Low-Bandwidth Channel Quality Indication for OFDMA Frequency Domain Packet Scheduling

    DEFF Research Database (Denmark)

    Kolding, Troels E.; Frederiksen, Frank; Pokhariyal, Akhilesh

    2007-01-01

     In this paper, we study methods for lowering the bandwidth needed for the UE to transmit channel quality indication (CQI) for time and frequency domain scheduling (FDPS) in OFDMA. We consider smart compression methods, such as threshold based indication, to only include scheduler-relevant inform...... In this paper, we study methods for lowering the bandwidth needed for the UE to transmit channel quality indication (CQI) for time and frequency domain scheduling (FDPS) in OFDMA. We consider smart compression methods, such as threshold based indication, to only include scheduler......-relevant information in the CQI. We find that a 60-70% CQI bandwidth reduction is possible with less than 5-10% impact on scheduling performance. Further, we consider the impact of lowering the CQI reporting rate on both mobility performance and increased measuring accuracy due to longer averaging interval. We find...

  19. Gain characteristics of erbium doped fiber amplifier

    Science.gov (United States)

    Zhang, Lihua; Du, Yungang; Xi, Ying; Li, Jijun; Zhao, Chunwang

    2008-12-01

    In the design of Erbium Doped Fiber Amplifier (EDFA), improving flat-gain has great important significance. The working principle and gain characteristics of EDFA are introduced briefly, the influence of the factors such as Erbium doped fiber (EDF) length and pump power on the gain of EDFA is analyzed in detail, and the simulation experiments were carried out with Optisystem software. The result shows that, when pump power is constant, with EDF length departing the optimal value, the gain of each channel decreases at different degrees; when EDF length is constant, with pump power departing the optimal value, the gain of each channel changes at different degrees. Moreover, Er3+ concentration has significant effect on the gain, and there is an optimal Er3+ concentration to get the largest gain.

  20. Joint optimization of production scheduling and machine group preventive maintenance

    International Nuclear Information System (INIS)

    Xiao, Lei; Song, Sanling; Chen, Xiaohui; Coit, David W.

    2016-01-01

    Joint optimization models were developed combining group preventive maintenance of a series system and production scheduling. In this paper, we propose a joint optimization model to minimize the total cost including production cost, preventive maintenance cost, minimal repair cost for unexpected failures and tardiness cost. The total cost depends on both the production process and the machine maintenance plan associated with reliability. For the problems addressed in this research, any machine unavailability leads to system downtime. Therefore, it is important to optimize the preventive maintenance of machines because their performance impacts the collective production processing associated with all machines. Too lengthy preventive maintenance intervals may be associated with low scheduled machine maintenance cost, but may incur expensive costs for unplanned failure due to low machine reliability. Alternatively, too frequent preventive maintenance activities may achieve the desired high reliability machines, but unacceptably high scheduled maintenance cost. Additionally, product scheduling plans affect tardiness and maintenance cost. Two results are obtained when solving the problem; the optimal group preventive maintenance interval for machines, and the assignment of each job, including the corresponding start time and completion time. To solve this non-deterministic polynomial-time problem, random keys genetic algorithms are used, and a numerical example is solved to illustrate the proposed model. - Highlights: • Group preventive maintenance (PM) planning and production scheduling are jointed. • Maintenance interval and assignment of jobs are decided by minimizing total cost. • Relationships among system age, PM, job processing time are quantified. • Random keys genetic algorithms (GA) are used to solve the NP-hard problem. • Random keys GA and Particle Swarm Optimization (PSO) are compared.

  1. MEDICAL STAFF SCHEDULING USING SIMULATED ANNEALING

    Directory of Open Access Journals (Sweden)

    Ladislav Rosocha

    2015-07-01

    Full Text Available Purpose: The efficiency of medical staff is a fundamental feature of healthcare facilities quality. Therefore the better implementation of their preferences into the scheduling problem might not only rise the work-life balance of doctors and nurses, but also may result into better patient care. This paper focuses on optimization of medical staff preferences considering the scheduling problem.Methodology/Approach: We propose a medical staff scheduling algorithm based on simulated annealing, a well-known method from statistical thermodynamics. We define hard constraints, which are linked to legal and working regulations, and minimize the violations of soft constraints, which are related to the quality of work, psychic, and work-life balance of staff.Findings: On a sample of 60 physicians and nurses from gynecology department we generated monthly schedules and optimized their preferences in terms of soft constraints. Our results indicate that the final value of objective function optimized by proposed algorithm is more than 18-times better in violations of soft constraints than initially generated random schedule that satisfied hard constraints.Research Limitation/implication: Even though the global optimality of final outcome is not guaranteed, desirable solutionwas obtained in reasonable time. Originality/Value of paper: We show that designed algorithm is able to successfully generate schedules regarding hard and soft constraints. Moreover, presented method is significantly faster than standard schedule generation and is able to effectively reschedule due to the local neighborhood search characteristics of simulated annealing.

  2. Schedule-Aware Workflow Management Systems

    Science.gov (United States)

    Mans, Ronny S.; Russell, Nick C.; van der Aalst, Wil M. P.; Moleman, Arnold J.; Bakker, Piet J. M.

    Contemporary workflow management systems offer work-items to users through specific work-lists. Users select the work-items they will perform without having a specific schedule in mind. However, in many environments work needs to be scheduled and performed at particular times. For example, in hospitals many work-items are linked to appointments, e.g., a doctor cannot perform surgery without reserving an operating theater and making sure that the patient is present. One of the problems when applying workflow technology in such domains is the lack of calendar-based scheduling support. In this paper, we present an approach that supports the seamless integration of unscheduled (flow) and scheduled (schedule) tasks. Using CPN Tools we have developed a specification and simulation model for schedule-aware workflow management systems. Based on this a system has been realized that uses YAWL, Microsoft Exchange Server 2007, Outlook, and a dedicated scheduling service. The approach is illustrated using a real-life case study at the AMC hospital in the Netherlands. In addition, we elaborate on the experiences obtained when developing and implementing a system of this scale using formal techniques.

  3. Maternal methadone dosing schedule and fetal neurobehavior

    Science.gov (United States)

    Jansson, Lauren M.; DiPietro, Janet A.; Velez, Martha; Elko, Andrea; Knauer, Heather; Kivlighan, Katie T.

    2008-01-01

    Objective Daily methadone maintenance is the standard of care for opiate dependency during pregnancy. Previous research has indicated that single-dose maternal methadone administration significantly suppresses fetal neurobehaviors. The purpose of this study was to determine if split-dosing would have less impact on fetal neurobehavior than single-dose administration. Methods Forty methadone-maintained women were evaluated at peak and trough maternal methadone levels on single- and split-dosing schedules. Monitoring sessions occurred at 36 and 37 weeks gestation in a counterbalanced study design. Fetal measures included heart rate, variability, accelerations, motor activity and fetal movement-heart rate coupling (FM-FHR). Maternal measures included heart period, variability, skin conductance, respiration and vagal tone. Repeated measure analysis of variance was used to evaluate within-subject changes between split- and single-dosing regimens. Results All fetal neurobehavioral parameters were suppressed by maternal methadone administration, regardless of dosing regimen. Fetal parameters at peak were significantly lower during single vs. split methadone administration. FM-FHR coupling was less suppressed from trough to peak during split-dosing vs. single-dosing. Maternal physiologic parameters were generally unaffected by dosing condition. Conclusion Split- dosed fetuses displayed less neurobehavioral suppression from trough to peak maternal methadone levels as compared to single-dosed fetuses. Split-dosing may be beneficial for methadone-maintained pregnant women. PMID:19085624

  4. GENETIC ALGORITHM APPLICATION FOR MULTI-CRITERIA SCHEDULING PROBLEM

    Directory of Open Access Journals (Sweden)

    I. V. Arkhipov

    2015-05-01

    Full Text Available The paper describes mathematical model and method of task solution for defining an enterprise work performance schedule. Two-stage feedstock processing is supposed to exist at the enterprise. At the first stage the sawing process into semimanufactured products is done. The second stage (finished products manufacturing stage includes durable processing of obtained semimanufactured products at one of the interchangeable work centers. The sawing process into semimanufactured products is carried out according to a plan, developed in advance and in compliance with technological charts. Scheduling consists of separate cutting calculation and planning of all feedstock cutting with the aim of the most effective specification task performance based on available reserves. Following the cutting plan, an enterprise work performance schedule is created. This schedule consists of the cutting sequence with volume, start and end time, and plan for loading of after-treatment. The solution to this problem becomes more involved due to the necessity of taking into account all features, limitations and parameters of process equipment, as well as of raw material and production orders. Special method based on genetic algorithm has been proposed for handling the problem. The algorithm has been tested on several different realproduction plans. Its efficiency estimation is given. The software systemimplemented on the proposed algorithm has been tested on real operating data of several sawmills. Reduction of machine idle time and incomplete production decrease has been confirmed by the enterprise specialists.

  5. Complete-block scheduling for advanced pharmacy practice experiences.

    Science.gov (United States)

    Hatton, Randy C; Weitzel, Kristin W

    2013-12-01

    An innovative approach to meeting increased student demand for advanced pharmacy practice experiences (APPEs) is described, including lessons learned during a two-year pilot project. To achieve more efficient allocation of preceptor resources, the University of Florida College of Pharmacy (UFCOP) adopted a new APPE rotation model in which 20 pharmacy students per year complete all required and elective APPEs at one practice site, an affiliated academic medical center. Relative to the prevailing model of experiential training for Pharm.D. students, the "complete-block scheduling" model offers a number of potential benefits to students, preceptors, and the pharmacy school. In addition to potentially reduced student housing expenses and associated conveniences, complete-block scheduling may enable (1) more efficient use of teaching resources, (2) increased collaboration among preceptors, (3) greater continuity and standardization of educational experiences, and (4) enhanced opportunities for students to engage in longer and more complex research projects. The single-site APPE rotation model also can provide value to the training site by enabling the extension of clinical pharmacy services; for example, UFCOP students perform anticoagulation monitoring and discharge medication counseling at the host institution. Despite logistical and other challenges encountered during pilot testing of the new scheduling model, the program has been well received by students and preceptors alike. Complete-block APPE scheduling is a viable model for some health systems to consider as a means of streamlining experiential education practices and helping to ensure high-quality clinical rotations for Pharm.D. students.

  6. Parents' concerns about vaccine scheduling in Shanghai, China.

    Science.gov (United States)

    Wagner, Abram L; Boulton, Matthew L; Sun, Xiaodong; Huang, Zhuoying; Harmsen, Irene A; Ren, Jia; Zikmund-Fisher, Brian J

    2017-08-03

    Several new vaccines have been introduced into China in recent years, but some parents in China have shown concerns about the scheduling of vaccinations for young infants. This study explores caregiver concerns about children receiving multiple vaccines during a single visit and about vaccine administration in infants vaccine information in Shanghai. Caregivers of children 8months to 7years presenting at immunization clinics in Shanghai completed a survey about vaccine co-administration and vaccine administration vaccine concerns using linear regression analyses that included these information sources after adjusting for socioeconomic variables. Among 618 caregivers, 64% were concerned about vaccine co-administration and 31% were concerned about vaccine administration to infants vaccine co-administration (95% CI: 0.04, 0.44). More trust in doctors and ratings of information from friends and family were not associated with vaccine concerns. Caregiver concerns about vaccine scheduling may limit China's flexibility to add vaccines to its official immunization schedule. Reporting information about vaccine safety on the Internet and bringing groups of parents together to discuss vaccines might help to ameliorate concerns about vaccine scheduling. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Adequacy of Prenatal Care and Gestational Weight Gain.

    Science.gov (United States)

    Yeo, SeonAe; Crandell, Jamie L; Jones-Vessey, Kathleen

    2016-02-01

    The goal of prenatal care is to maximize health outcomes for a woman and her fetus. We examined how prenatal care is associated with meeting the 2009 Institute of Medicine (IOM) guidelines for gestational weight gain. The study used deidentified birth certificate data supplied by the North Carolina State Center for Health Statistics. The sample included 197,354 women (≥18 years) who delivered singleton full-term infants in 2011 and 2012. A generalized multinomial model was used to identify how adequate prenatal care was associated with the odds of gaining excessive or insufficient weight during pregnancy according to the 2009 IOM guidelines. The model adjusted for prepregnancy body size, sociodemographic factors, and birth weight. A total of 197,354 women (≥18 years) delivered singleton full-term infants. The odds ratio (OR) for excessive weight gain was 2.44 (95% CI 2.37-2.50) in overweight and 2.33 (95% CI 2.27-2.40) in obese women compared with normal weight women. The OR for insufficient weight gain was 1.15 (95% CI 1.09-1.22) for underweight and 1.34 (95% CI 1.30-1.39) for obese women compared with normal weight women. Prenatal care at the inadequate or intermediate levels was associated with insufficient weight gain (OR: 1.32, 95% CI 1.27-1.38; OR: 1.15, 95% CI 1.09-1.21, respectively) compared with adequate prenatal care. Women with inadequate care were less likely to gain excessive weight (OR: 0.88, 95% CI 0.86-0.91). Whereas prenatal care was effective for preventing insufficient weight gain regardless of prepregnancy body size, educational background, and racial/ethnic group, there were no indications that adequate prenatal care was associated with reduced risk for excessive gestational weight gain. Further research is needed to improve prenatal care programs for preventing excess weight gain.

  8. NEWS OF THE NATIONAL IMMUNIZATION SCHEDULE

    Directory of Open Access Journals (Sweden)

    O. V. Shamsheva

    2014-01-01

    Full Text Available The article presents the changes Immunization Schedule Russia introduced in 2014. In new Schedule now is the vaccination against pneumococcal disease for all children of 2 months with revaccination at 4 and 15 months old; excluded from the Schedule second revaccination against tuberculosis. At risk groups to be vaccinated against the flu, entered pregnant women and persons subject to military conscription. Recommendations on use of vaccines containing relevant antigens for the Russian Federation, to provide maximum effectiveness of immunization and vaccines that do not contain preservatives in children under 1 year of age. Offered to create a council of experts in the field of vaccinology and vaccine prevention

  9. Simultaneous scheduling of machines and mobile robots

    DEFF Research Database (Denmark)

    Dang, Vinh Quang; Nielsen, Izabela Ewa

    2013-01-01

    This paper deals with the problem of simultaneously scheduling machines and a number of autonomous mobile robots in a flexible manufacturing system (FMS). Besides capability of transporting materials between machines, the considered mobile robots are different from other material handling devices...... in terms of their advanced ability to perform tasks at machines by using their manipulation arms. The mobile robots thus have to be scheduled in relation to scheduling of machines so as to increase the efficiency of the overall system. The performance criterion is to minimize time required to complete all...

  10. Weight gain after bariatric surgery as a result of a large gastric stoma: endotherapy with sodium morrhuate may prevent the need for surgical revision.

    Science.gov (United States)

    Catalano, Marc F; Rudic, Goran; Anderson, Alfred J; Chua, Thomas Y

    2007-08-01

    Obesity affects more than 30% of the U.S. population and is associated with the development of life-threatening complications. Numerous therapeutic approaches to the problem have been advocated, including low-calorie diets, anoretic drugs, behavior modifications, and exercise therapy. The only treatment proven to be effective in the long-term management of morbid obesity is surgical intervention. Complications of bariatric surgery include stomal stenosis and/or ulcer and stomal dilation (secondary to overeating). The latter complication can result in a gain of previously lost weight. To determine the effect of endoscopic injection by using a sclerosant (sodium morrhuate) to induce stomal stenosis in patients who present with stomal dilatation complicated by weight gain. Bariatric patients with a large gastric stoma were treated with sodium morrhuate stomal injection. Diameters of the stoma were followed at repeat endoscopy. Weight loss at scheduled clinic visits were compared with pretherapy weights. Twenty-eight patients (10 men, 18 women; age range, 27-58 years), after bariatric surgery with GI bypass, were referred with weight gain after initial weight loss. Weight gain was believed to be the result of a large gastric stoma. Treatment included injection of sodium morrhuate (1-2 mL circumferentially) surrounding the stoma. A total of 1 to 3 injection sessions were performed in an attempt to achieve a stoma diameter of 1.2 cm or smaller. Treatment success was defined as a decrease of stoma size to weight loss >or=75% of the weight the patient gained after establishing a steady state post bariatric surgery weight. A total of 2.3 injection sessions were performed. Successful endotherapy was achieved in 18 of 28 patients (64%). One patient developed symptoms of stomal stenosis, which required 2 separate balloon dilating sessions. No other complications were encountered. Retrospective case series. Endoscopic injection of sodium morrhuate surrounding the dilated

  11. Starshade Observation Scheduling for WFIRST

    Science.gov (United States)

    Soto, Gabriel; Garrett, Daniel; Delacroix, Christian; Savransky, Dmitry

    2018-01-01

    An exoplanet direct imaging mission can employ an external starshade for starlight suppression to achieve higher contrasts and potentially higher throughput than with an internal coronagraph. This separately-launched starshade spacecraft is assumed to maintain a single, constant separation distance from the space telescope—for this study, the Wide Field Infrared Survey Telescope (WFIRST)—based on a designated inner working angle during integration times. The science yield of such a mission can be quantified using the Exoplanet Open-Source Imaging Simulator (EXOSIMS): this simulator determines the distributions of mission outcomes, such as the types and amount of exoplanet detections, based on ensembles of end-to-end simulations of the mission. This study adds a starshade class to the survey simulation module of EXOSIMS and outlines a method for efficiently determining observation schedules. The new starshade class solves boundary value problems using circular restricted three-body dynamics to find fast, high-accuracy estimates of the starshade motion while repositioning between WFIRST observations. Fuel usage dictates the mission lifetime of the starshade given its limited fuel supply and is dominated by the Δv used to reposition the starshade between the LOS of different targets; the repositioning time-of-flight is kept constant in this study. A starshade burns less fuel to reach certain target stars based on their relative projected positions on a skymap; other targets with costly transfers can be filtered out to increase the starshade mission duration. Because the initial target list can consist of nearly 2000 stars, calculating the Δv required to move the starshade to every other star on the target list would be too computationally expensive and renders running ensembles of survey simulations infeasible. Assuming the starshade begins its transfer at the LOS of a certain star, a Δv curve is approximated for the remaining target stars based on their right

  12. SOFIA'S Challenge: Scheduling Airborne Astronomy Observations

    Science.gov (United States)

    Frank, Jeremy

    2005-01-01

    generate flights enables humans to assess and analyze complex tradeoffs between fuel consumption, estimated science quality and the percentage of scheduled observations. Due to the changing nature of SOFIA scheduling problems, this functionality will play a crucial role in optimizing science and minimizing costs during operations. In the full paper, we will summarize the technical challenges that have been met in order to build this system. These include: design of the search algorithm, design of appropriate heuristics and approximations, and reduction in the size of the search space. We will also describe technical challenges that are currently being addressed, including the extension of the existing approach to handle new solution criteria. Finally, we will describe a variety of cultural challenges that the astronomical community must address in order to successfully use SOFIA, and describe how the AFT can be used to address some of these challenges. Specifically, many of the intended science users are accustomed to using ground-based or space-based observatories; we will identify some differences that arise due to the nature of airborne observatories, and how the AFT can be extended to provide useful services to ease these cultural differences.

  13. Psychosocial influences on weight gain attitudes and behaviors during pregnancy.

    Science.gov (United States)

    Dipietro, Janet A; Millet, Sarah; Costigan, Kathleen A; Gurewitsch, Edith; Caulfield, Laura E

    2003-10-01

    To examine pregnant women's weight-related attitudes and behaviors in relation to a constellation of psychosocial characteristics, prepregnancy body habitus, and gestational weight gain. One hundred-thirty women with low-risk, normal pregnancies. Cross-sectional, observational study assessed attitudes about weight gain at 36 weeks' gestation. Psychosocial characteristics, including anxiety, depression, social support, emotionality, and pregnancy-specific and nonspecific stress appraisal were assessed between 28 and 36 weeks' gestation. Principal components factor analysis, Pearson correlations, t tests, and analysis of variance. A range of positive and negative attitudes about weight gain was expressed. Twenty-one percent (n=27) of the sample endorsed at least one weight-restrictive behavior during pregnancy. Women who reported more weight-restrictive behaviors were more anxious (r=.24, P<.01), depressed (r=.29,P<.001), angry (r=.29, P<.001), stressed (r=.23, P<.01), and felt less uplifted (r=-.21, P<.05) about their pregnancies in general. Higher Positive Pregnancy Body Image scores were associated with feeling better about the pregnancy in general (r=.35, P<.001), fewer depressive symptoms, and less anger (both r=.20, both P<.01). Women who were self conscious about their weight gain felt more hassled by their pregnancies (r=.21, P<.05), greater anger (r=.21, P<.05), and more support from partners (r=.22, P<.05). Prepregnancy body mass index was unrelated, but negative attitudes about weight gain existed even among women who gained within recommended ranges. Women's attitudes about weight gain in pregnancy are imbedded in their orientation toward pregnancy as well as their general psychological functioning. Effective nutrition counseling for pregnant women should include consideration of weight-restrictive behaviors, the degree to which the pregnancy is perceived as positive and uplifting, and whether weight gain attitudes may be associated with their

  14. Advisory Committee on Immunization Practices Recommended Immunization Schedules for Persons Aged 0 Through 18 Years--United States, 2016.

    Science.gov (United States)

    Robinson, Candice L

    2016-02-05

    Each year, the Advisory Committee on Immunization Practices (ACIP)* reviews the recommended immunization schedules for persons aged 0 through 18 years to ensure that the schedules reflect current recommendations for Food and Drug Administration-licensed vaccines. In October 2015, ACIP approved the recommended immunization schedules for persons aged 0 through 18 years for 2016; the 2016 schedules include several changes from the 2015 immunization schedules. For 2016, the figures, footnotes, and tables will be published on the CDC immunization schedule website (http://www.cdc.gov/vaccines/schedules/index.html). This provides readers electronic access to the most current version of the schedules and footnotes on the CDC website. Health care providers are advised to use figures, tables, and the combined footnotes together. Printable versions of the 2016 immunization schedules for persons aged 0 through 18 years in several formats (e.g., portrait, landscape, and pocket-sized versions) and ordering instructions for laminated versions and "parent-friendly" schedules are available at the immunization schedule website.

  15. Gain-P: A new strategy to increase furrow irrigation efficiency

    International Nuclear Information System (INIS)

    Schmitz, G.H.; Wohling, T.; Paly, M. D.; Schutze, N.

    2007-01-01

    The new methodology GAIN-P combines Genetic Algorithms, Artificial Intelligence techniques and rigorous Process modeling for substantially improving irrigation efficiency. The new strategy simultaneously identifies optimal values of both scheduling and irrigation parameters for an entire growing season and can be applied to irrigation systems with adequate or deficit water supply. In this contribution, GAIN-P is applied to furrow irrigation tackling the more difficult subject of the more effective deficit irrigation. A physically -based hydrodynamic irrigation model is iteratively coupled with a 2D subsurface flow model for generating a database containing all realistically feasible scenarios of water application in furrow irrigation. It is used for training a problem-adapted artificial neural network based on self-organized maps, which in turn portrays the inverse solution of the hydrodynamic furrow irrigation model and thus enormously speeds up the overall performance of the complete optimization tool. Global optimization with genetic algorithm finds the schedule with maximum crop yield for the given water volume. The impact of different irrigation schedules on crop yield is calculated by the coupled furrow irrigation model which also simulates soil evaporation, precipitation and root water uptake by the plants over the whole growing seasons, as well as crop growth and yield. First results with the new optimization strategy show that GAIN-P has a high potential to increase irrigation efficiency. (author)

  16. Efficient Academic Scheduling at the U.S. Naval Academy

    National Research Council Canada - National Science Library

    Zane, David

    2003-01-01

    This research project examined academic scheduling problems at the U.S. Naval Academy. The focus was on devising methods to construct good final exam schedules and improve existing course schedules by facilitation course changes...

  17. Models and Algorithms for Production Planning and Scheduling in Foundries – Current State and Development Perspectives

    Directory of Open Access Journals (Sweden)

    A. Stawowy

    2012-04-01

    Full Text Available Mathematical programming, constraint programming and computational intelligence techniques, presented in the literature in the field of operations research and production management, are generally inadequate for planning real-life production process. These methods are in fact dedicated to solving the standard problems such as shop floor scheduling or lot-sizing, or their simple combinations such as scheduling with batching. Whereas many real-world production planning problems require the simultaneous solution of several problems (in addition to task scheduling and lot-sizing, the problems such as cutting, workforce scheduling, packing and transport issues, including the problems that are difficult to structure. The article presents examples and classification of production planning and scheduling systems in the foundry industry described in the literature, and also outlines the possible development directions of models and algorithms used in such systems.

  18. Schedule Control and Nursing Home Quality: Exploratory Evidence of a Psychosocial Predictor of Resident Care.

    Science.gov (United States)

    Hurtado, David A; Berkman, Lisa F; Buxton, Orfeu M; Okechukwu, Cassandra A

    2016-02-01

    To examine whether nursing homes' quality of care was predicted by schedule control (workers' ability to decide work hours), independently of other staffing characteristics. Prospective ecological study of 30 nursing homes in New England. Schedule control was self-reported via survey in 2011-2012 (N = 1,045). Quality measures included the prevalence of decline in activities of daily living, residents' weight loss, and pressure ulcers, indicators systematically linked with staffing characteristics. Outcomes data for 2012 were retrieved from Medicare.gov. Robust Linear Regressions showed that higher schedule control predicted lower prevalence of pressure ulcers (β = -0.51, p job satisfaction, and turnover intentions. Higher schedule control might enhance the planning and delivery of strategies to prevent or cure pressure ulcers. Further research is needed to identify potential causal mechanisms by which schedule control could improve quality of care. © The Author(s) 2014.

  19. Energy Gaining Windows for Residental Buildings

    DEFF Research Database (Denmark)

    Kragh, Jesper; Laustsen, Jacob Birck; Svendsen, Svend

    2008-01-01

    This paper presents some of the research done during the last 8 years at the Technical University of Denmark developing improved low-energy window solutions. The focus has been on maximizing the net energy gain of windows for residential buildings. The net energy gain of windows is the solar gain...... minus the heat loss integrated over the heating season. It is assumed that in northern cold climates all of the solar gain during the heating season can be utilized for space heating. Problems with overheating in the summer period must be solved with overhang or moveable solar shading devices. Two...... and longer durability of the window. The glazing in these fiber reinforced polyester windows is both unsealed and sealed triple glazing units. To increase the net energy gain slim frame profiles have been developed to increase the glazing area and thereby the solar gain. The challenge when developing slim...

  20. TIME RESERVES DURING THE ORGANISATION OF FREIGHT TRAIN MOVEMENT ON SCHEDULE

    Directory of Open Access Journals (Sweden)

    D. M. Kozachenko

    2015-03-01

    Full Text Available Purpose. The article is devoted to the development of estimation methods of time reserves that should be formed at the train schedule and the schedule for the turnover of freight trains, required to ensure the sustained interaction of technological processes of industrial enterprises and railways for the transportation of freight on schedule. Methodology. The paper considers the issues of bulk conveyance organization between industrial enterprises on schedule. In order to ensure the arrival of trains at the destination station to the specified time, the schedules of rolling stocks turnover must have some time reserves. These reserves, in their turn, should be sufficient for correction action of destabilizing factors. The methods of mathematical statistics were used to study the schedule performance quality of separate trains. Currently the movement of the main part of freight trains is performed on preparedness and occupation processes of separate schedule train paths by some depots are not fixed. Therefore, the analyses of the schedule performance of freight trains do not allow receiving the material for research. And, due to the lack of statistical material on the punctuality of the schedule for the movement of freight trains, research of the passenger trains movement with subsequent dissemination of results on freight movement were carried out by the authors. Findings. The research proved that the trains arrival at the destination station according to the schedule should be ensured by permissible rating of delay as well as increase the operating time of trains and running intervals. The values of the additional time reserves that should be included in the schedule of trains, and the schedule for the turnover of freight trains to provide conditional interaction of railroads and industrial enterprises in Ukraine were proposed. Originality. On the basis of the research development graph methods of trains turnover, providing transportation of

  1. Dynamical model for retrieval of tram schedule

    Science.gov (United States)

    Nagatani, Takashi

    2007-04-01

    We present the dynamical model for retrieval of a tram schedule when trams arrive at stops slower or faster than the schedule. Trams speed up or stop shorter to retrieve the delay. The dynamics of the trams is expressed in terms of the nonlinear maps. We study the dynamical behavior of trams when they control the speed and stopping time to retrieve the schedule. The arrival times of trams exhibit the complex behavior with varying trips. The trams show the periodic and irregular (chaotic) motions even if there are no noises. The tram chaos is controlled by varying both stopping time and degree of speedup. The tram schedule is connected with the complex motions of trams. The region map (phase diagram) is shown to control the complex motions of trams.

  2. Home Appliance Load Scheduling with SEMIAH

    DEFF Research Database (Denmark)

    Jacobsen, Rune Hylsberg; Ghasem Azar, Armin; Zhang, Qi

    2015-01-01

    The European research project SEMIAH aims at designing a scalable infrastructure for residential demand response. This paper presents the progress towards a centralized load scheduling algorithm for controlling home appliances taking power grid constraints and satisfaction of consumers into account....

  3. Scheduling Network Traffic for Grid Purposes

    DEFF Research Database (Denmark)

    Gamst, Mette

    This thesis concerns scheduling of network traffic in grid context. Grid computing consists of a number of geographically distributed computers, which work together for solving large problems. The computers are connected through a network. When scheduling job execution in grid computing, data...... transmission has so far not been taken into account. This causes stability problems, because data transmission takes time and thus causes delays to the execution plan. This thesis proposes the integration of job scheduling and network routing. The scientific contribution is based on methods from operations...... research and consists of six papers. The first four considers data transmission in grid context. The last two solves the data transmission problem, where the number of paths per data connection is bounded from above. The thesis shows that it is possible to solve the integrated job scheduling and network...

  4. Efficient Load Scheduling Method For Power Management

    Directory of Open Access Journals (Sweden)

    Vijo M Joy

    2015-08-01

    Full Text Available An efficient load scheduling method to meet varying power supply needs is presented in this paper. At peak load times the power generation system fails due to its instability. Traditionally we use load shedding process. In load shedding process disconnect the unnecessary and extra loads. The proposed method overcomes this problem by scheduling the load based on the requirement. Artificial neural networks are used for this optimal load scheduling process. For generate economic scheduling artificial neural network has been used because generation of power from each source is economically different. In this the total load required is the inputs of this network and the power generation from each source and power losses at the time of transmission are the output of the neural network. Training and programming of the artificial neural networks are done using MATLAB.

  5. Strategic Gang Scheduling for Railroad Maintenance

    Science.gov (United States)

    2012-08-14

    We address the railway track maintenance scheduling problem. The problem stems from the : significant percentage of the annual budget invested by the railway industry for maintaining its railway : tracks. The process requires consideration of human r...

  6. Schedule Sales Query Report Generation System

    Data.gov (United States)

    General Services Administration — Schedule Sales Query presents sales volume figures as reported to GSA by contractors. The reports are generated as quarterly reports for the current year and the...

  7. Cure Schedule for Stycast 2651/Catalyst 11.

    Energy Technology Data Exchange (ETDEWEB)

    Kropka, Jamie Michael [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); McCoy, John D. [New Mexico Inst. of Mining and Technology, Socorro, NM (United States)

    2017-11-01

    The Henkel technical data sheet (TDS) for Stycast 2651/Catalyst 11 lists three alternate cure schedules for the material, each of which would result in a different state of reaction and different material properties. Here, a cure schedule that attains full reaction of the material is defined. The use of this cure schedule will eliminate variance in material properties due to changes in the cure state of the material, and the cure schedule will serve as the method to make material prior to characterizing properties. The following recommendation was motivated by (1) a desire to cure at a single temperature for ease of manufacture and (2) a desire to keep the cure temperature low (to minimize residual stress build-up associated with the cooldown from the cure temperature to room temperature) without excessively limiting the cure reaction due to vitrification (i.e., material glass transition temperature, Tg, exceeding cure temperature).

  8. Quantify Risk to Manage Cost and Schedule

    National Research Council Canada - National Science Library

    Raymond, Fred

    1999-01-01

    Too many projects suffer from unachievable budget and schedule goals, caused by unrealistic estimates and the failure to quantify and communicate the uncertainty of these estimates to managers and sponsoring executives...

  9. 40 CFR 52.626 - Compliance schedules.

    Science.gov (United States)

    2010-07-01

    ...) APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS Hawaii § 52.626 Compliance schedules. (a) (b) The.... Source Location Regulation sections involved Date of adoption Nanakuli Paving & Rock Co., Ltd Molokai 8...

  10. Enhancements to highway construction scheduling expert system.

    Science.gov (United States)

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  11. Schedule of average annual equipment ownership expense

    Science.gov (United States)

    2003-03-06

    The "Schedule of Average Annual Equipment Ownership Expense" is designed for use on Force Account bills of Contractors performing work for the Illinois Department of Transportation and local government agencies who choose to adopt these rates. This s...

  12. Congruent Validity of the Rathus Assertiveness Schedule.

    Science.gov (United States)

    Harris, Thomas L.; Brown, Nina W.

    1979-01-01

    The validity of the Rathus Assertiveness Schedule (RAS) was investigated by correlating it with the six Class I scales of the California Psychological Inventory on a sample of undergraduate students. Results supported the validity of the RAS. (JKS)

  13. Onboard Autonomous Scheduling Intelligence System, Phase I

    Data.gov (United States)

    National Aeronautics and Space Administration — Scheduling the daily activities of the crew on a human space mission is currently a cumbersome job performed by a large team of operations experts on the ground....

  14. Alternative Work Schedules Increase Employee Satisfaction.

    Science.gov (United States)

    Turney, John R.; Cohen, Stanley L.

    1983-01-01

    Facets of alternative work schedules (AWS) are discussed: importance of employee control, possible negative consequences, AWS handbook, time monitoring systems, and treatment of exceptions. AWS' effect on productivity and motivation is examined. (SK)

  15. Knowledge-based scheduling of arrival aircraft

    Science.gov (United States)

    Krzeczowski, K.; Davis, T.; Erzberger, H.; Lev-Ram, I.; Bergh, C.

    1995-01-01

    A knowledge-based method for scheduling arrival aircraft in the terminal area has been implemented and tested in real-time simulation. The scheduling system automatically sequences, assigns landing times, and assigns runways to arrival aircraft by utilizing continuous updates of aircraft radar data and controller inputs. The scheduling algorithms is driven by a knowledge base which was obtained in over two thousand hours of controller-in-the-loop real-time simulation. The knowledge base contains a series of hierarchical 'rules' and decision logic that examines both performance criteria, such as delay reduction, as well as workload reduction criteria, such as conflict avoidance. The objective of the algorithms is to devise an efficient plan to land the aircraft in a manner acceptable to the air traffic controllers. This paper will describe the scheduling algorithms, give examples of their use, and present data regarding their potential benefits to the air traffic system.

  16. Integrated Fractional Load and Packet Scheduling for OFDMA Systems

    DEFF Research Database (Denmark)

    Monghal, Guillaume Damien; Kumar, S.; Pedersen, Klaus I.

    2009-01-01

    . This type of situation should result in a global increase of signal to interference and noise ratio (SINR) conditions in the network. We propose different methods integrating the transmission pattern selection to the packet scheduling functionality of the enode-B depending only on the channel quality...... indicator (CQI) reports from the user equipments. Fractional load handling is operated without inter eNode-B coordination. We conclude that the system can operate under fractional load conditions if the CQI is calculated with wideband interference. Further gain can be obtained if the CQI is calculated...... with local interference, however, in that case, it is necessary to inject a certain time correlation in the transmission patterns due to reporting delay....

  17. A hybrid algorithm for unrelated parallel machines scheduling

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2016-09-01

    Full Text Available In this paper, a new hybrid algorithm based on multi-objective genetic algorithm (MOGA using simulated annealing (SA is proposed for scheduling unrelated parallel machines with sequence-dependent setup times, varying due dates, ready times and precedence relations among jobs. Our objective is to minimize makespan (Maximum completion time of all machines, number of tardy jobs, total tardiness and total earliness at the same time which can be more advantageous in real environment than considering each of objectives separately. For obtaining an optimal solution, hybrid algorithm based on MOGA and SA has been proposed in order to gain both good global and local search abilities. Simulation results and four well-known multi-objective performance metrics, indicate that the proposed hybrid algorithm outperforms the genetic algorithm (GA and SA in terms of each objective and significantly in minimizing the total cost of the weighted function.

  18. The role of the production scheduling system in rescheduling

    Science.gov (United States)

    Kalinowski, K.; Grabowik, C.; Kempa, W.; Paprocka, I.

    2015-11-01

    The paper presents the rescheduling problem in the context of cooperation between production scheduling system (PSS) and other units in an integrated manufacturing environment - decision makers and software systems. The main aim is to discuss the PSS functionality for maximizing automation of the rescheduling process, reducing the response time and improving the quality of generated solutions. PSSs operate in the meeting of tactical and operational level of planning and control, and play an important role in the production preparation and control. On the basis of information about orders, technology and production system state (e.g. resources availability) they prepare and/or update a detailed plan of production flow - a schedule. All necessary data for scheduling and rescheduling are usually collected in other systems both from organizational and technical production preparation, e.g. ERP, PLM, MES, CAPP or others, as well as they are entered directly by the decision- makers/operators. Data acquired in this way are often incomplete and inconsistent. Therefore the existing rescheduling software works according to interactive method - rather support but does not replace the human decision maker in tasks planning. When rescheduling, due to the limited amount of time to make a decision this interaction is particularly important. An additional problem arises in data acquisition, in the process of data exchanging between systems or in the identification of new data sources and their processing. Different approaches to rescheduling were characterized, including those solutions, where all these operations are carried out by an autonomous system and those in which scheduling is performed only upon request from the outside, for the newly created scheduling data representing the current state of the production system.

  19. Semi-online patient scheduling in pathology laboratories.

    Science.gov (United States)

    Azadeh, Ali; Baghersad, Milad; Farahani, Mehdi Hosseinabadi; Zarrin, Mansour

    2015-07-01

    Nowadays, effective scheduling of patients in clinics, laboratories, and emergency rooms is becoming increasingly important. Hospitals are required to maximize the level of patient satisfaction, while they are faced with lack of space and facilities. An effective scheduling of patients in existing conditions is vital for improving healthcare delivery. The shorter waiting time of patients improves healthcare service quality and efficiency. Focusing on real settings, this paper addresses a semi-online patient scheduling problem in a pathology laboratory located in Tehran, Iran, as a case study. Due to partial precedence constraints of laboratory tests, the problem is formulated as a semi-online hybrid shop scheduling problem and a mixed integer linear programming model is proposed. A genetic algorithm (GA) is developed for solving the problem and response surface methodology is used for setting GA parameters. A lower bound is also calculated for the problem, and several experiments are conducted to estimate the validity of the proposed algorithm. Based on the empirical data collected from the pathology laboratory, comparison between the current condition of the laboratory and the results obtained by the proposed approach is performed through simulation experiments. The results indicate that the proposed approach can significantly reduce waiting time of the patients and improve operations efficiency. The proposed approach has been successfully applied to scheduling patients in a pathology laboratory considering the real-world settings including precedence constraints of tests, constraint on the number of sites or operators for taking tests (i.e. multi-machine problem), and semi-online nature of the problem. Copyright © 2015 Elsevier B.V. All rights reserved.

  20. Controlling noise in plasmonic structures with gain

    Science.gov (United States)

    Vyshnevyy, A. A.; Fedyanin, D. Yu.

    2017-09-01

    Loss compensation by gain medium gives the possibility to exploit subwavelength confinement of light in plasmonic nanostructures and construct nanoscale plasmonic circuits. However, due to fundamentally unavoidable spontaneous emission from the gain medium, lossless waveguides suffer from strong photonic noise, which limits their practical applications. Here we demonstrate the possibility of significant decrease of the noise level while preserving physical dimensions of lossless plasmonic waveguides with gain. Our findings are aimed at extending the communication capabilities of on-chip plasmonic networks.

  1. Overcoming barriers to scheduling embedded generation to support distribution networks

    Energy Technology Data Exchange (ETDEWEB)

    Wright, A.J.; Formby, J.R.

    2000-07-01

    Current scheduling of embedded generation for distribution in the UK is limited and patchy. Some DNOs actively schedule while others do none. The literature on the subject is mainly about accommodating volatile wind output, and optimising island systems, for both cost of supply and network stability. The forthcoming NETA will lower prices, expose unpredictable generation to imbalance markets and could introduce punitive constraint payments on DNOs, but at the same time create a dynamic market for both power and ancillary services from embedded generators. Most renewable generators either run as base load (e.g. waste ) or according to the vagaries of the weather (e.g. wind, hydro), so offer little scope for scheduling other than 'off'. CHP plant is normally heat- led for industrial processes or building needs, but supplementary firing or thermal storage often allow considerable scope for scheduling. Micro-CHP with thermal storage could provide short-term scheduling, but tends to be running anyway during the evening peak. Standby generation appears to be ideal for scheduling, but in practice operators may be unwilling to run parallel with the network, and noise and pollution problems may preclude frequent operation. Statistical analysis can be applied to calculate the reliability of several generators compared to one; with a large number of generators such as micro-CHP reliability of a proportion of load is close to unity. The type of communication for generation used will depend on requirements for bandwidth, cost, reliability and whether it is bundled with other services. With high levels of deeply embedded, small-scale generation using induction machines, voltage control and black start capability will become important concerns on 11 kV and LV networks. This will require increased generation monitoring and remote control of switchgear. Examples of cost benefits from scheduling are given, including deferred reinforcement, increased exports on non

  2. Weight gain during pregnancy :the characteristics of women who experience excess weight gain /1990.

    OpenAIRE

    Ling, Carol Carlson

    1990-01-01

    Weight gain during pregnancy, relationships among body image, body weight standards, and attitudes toward weight gain were investigated. Weight gain recommendations, based on preconceptional weight status (PCWS) reflected current practices in prenatal care at Sentara Norfolk General Hospital, Norfolk, VA, and provided a basis on which to categorize weight gain as inadequate, appropriate, and excess. Women who experienced excess weight gain (EWG) were compared to those who ex...

  3. Maximizing System Lifetime by Battery Scheduling

    OpenAIRE

    Jongerden, M.R.; Haverkort, Boudewijn R.H.M.; Bohnenkamp, H.C.; Katoen, Joost P.

    2009-01-01

    The use of mobile devices is limited by the battery lifetime. Some devices have the option to connect an extra battery, or to use smart battery-packs with multiple cells to extend the lifetime. In these cases, scheduling the batteries over the load to exploit recovery properties usually extends the system lifetime. Straightforward scheduling schemes, like round robin or choosing the best battery available, already provide a big improvement compared to a sequential discharge of the batteries. ...

  4. A Program Master Schedule Can Improve Results

    Science.gov (United States)

    2014-02-01

    briefings, so PMOs often rely on static pictures and Gantt charts available on presentation software such as Microsoft PowerPoint. That’s fine—and...dependencies, current status and individual forecasts to be overlaid and projected in a program context. Commercial scheduling software is...uniquely capable of doing this in re- peatable and reliable fashion. However, scheduling software doesn’t always produce the “pretty” pictures preferred for

  5. Drug discrimination under a concurrent schedule.

    OpenAIRE

    Snodgrass, S H; McMillan, D E

    1996-01-01

    Three pigeons were trained to discriminate a 5.0 mg/kg dose of pentobarbital from saline under a two-key concurrent schedule with responding on the key associated with the presession injection, under both stimulus conditions, producing four times as many reinforcers as responding on the other key. This concurrent schedule resulted in approximately 70% responding to the higher reinforcement key under the pentobarbital stimulus and approximately 30% responding to that key under the saline stimu...

  6. Academic Meeting Scheduling Using an Antiferromagnetic Potts Model

    Science.gov (United States)

    Kudo, Kazue

    2017-07-01

    Scheduling parallel sessions of an academic meeting is a complicated task. If each presentation is assigned to an appropriate session, an antiferromagnetic Potts model can be used for semi-automatic timetabling. The timetabling method proposed here is based on graph coloring and includes additional constraints to be considered in a practical situation. We examine the feasibility of semi-automatic timetabling in some practical examples.

  7. Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

    Science.gov (United States)

    Kotegawa, Tatsuya; Cayabyab, Charlene Anne; Almog, Noam

    2013-01-01

    Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

  8. Prescribed Travel Schedules for Fatigue Management

    Science.gov (United States)

    Whitmire, Alexandra; Johnston, Smith; Lockley, Steven

    2011-01-01

    The NASA Fatigue Management Team is developing recommendations for managing fatigue during travel and for shift work operations, as Clinical Practice Guidelines for the Management of Circadian Desynchrony in ISS Operations. The Guidelines provide the International Space Station (ISS ) flight surgeons and other operational clinicians with evidence-based recommendations for mitigating fatigue and other factors related to sleep loss and circadian desynchronization. As much international travel is involved both before and after flight, the guidelines provide recommendations for: pre-flight training, in-flight operations, and post-flight rehabilitation. The objective of is to standardize the process by which care is provided to crewmembers, ground controllers, and other support personnel such as trainers, when overseas travel or schedule shifting is required. Proper scheduling of countermeasures - light, darkness, melatonin, diet, exercise, and medications - is the cornerstone for facilitating circadian adaptation, improving sleep, enhancing alertness, and optimizing performance. The Guidelines provide, among other things, prescribed travel schedules that outline the specific implementation of these mitigation strategies. Each travel schedule offers evidence based protocols for properly using the NASA identified countermeasures for fatigue. This presentation will describe the travel implementation schedules and how these can be used to alleviate the effects of jet lag and/or schedule shifts.

  9. Spiking Neural P Systems With Scheduled Synapses.

    Science.gov (United States)

    Cabarle, Francis George C; Adorna, Henry N; Jiang, Min; Zeng, Xiangxiang

    2017-12-01

    Spiking neural P systems (SN P systems) are models of computation inspired by biological spiking neurons. SN P systems have neurons as spike processors, which are placed on the nodes of a directed and static graph (the edges in the graph are the synapses). In this paper, we introduce a variant called SN P systems with scheduled synapses (SSN P systems). SSN P systems are inspired and motivated by the structural dynamism of biological synapses, while incorporating ideas from nonstatic (i.e., dynamic) graphs and networks. In particular, synapses in SSN P systems are available only at specific durations according to their schedules. The SSN P systems model is a response to the problem of introducing durations to synapses of SN P systems. Since SN P systems are in essence static graphs, it is natural to consider them for dynamic graphs also. We introduce local and global schedule types, also taking inspiration from the above-mentioned sources. We prove that SSN P systems are computationally universal as number generators and acceptors for both schedule types, under a normal form (i.e., a simplifying set of restrictions). The introduction of synapse schedules for either schedule type proves useful in programming the system, despite restrictions in the normal form.

  10. Data-oriented scheduling for PROOF

    International Nuclear Information System (INIS)

    Xu Neng; Guan Wen; Wu Sau Lan; Ganis, Gerardo

    2011-01-01

    The Parallel ROOT Facility - PROOF - is a distributed analysis system optimized for I/O intensive analysis tasks of HEP data. With LHC entering the analysis phase, PROOF has become a natural ingredient for computing farms at Tier3 level. These analysis facilities will typically be used by a few tenths of users, and can also be federated into a sort of analysis cloud corresponding to the Virtual Organization of the experiment. Proper scheduling is required to guarantee fair resource usage, to enforce priority policies and to optimize the throughput. In this paper we discuss an advanced priority system that we are developing for PROOF. The system has been designed to automatically adapt to unknown length of the tasks, to take into account the data location and availability (including distribution across geographically separated sites), and the {group, user} default priorities. In this system, every element - user, group, dataset, job slot and storage - gets its priority and those priorities are dynamically linked with each other. In order to tune the interplay between the various components, we have designed and started implementing a simulation application that can model various type and size of PROOF clusters. In this application a monitoring package records all the changes of them so that we can easily understand and tune the performance. We will discuss the status of our simulation and show examples of the results we are expecting from it.

  11. Vaccination schedules in small ruminant farms.

    Science.gov (United States)

    Lacasta, D; Ferrer, L M; Ramos, J J; González, J M; Ortín, A; Fthenakis, G C

    2015-12-14

    Development and implementation of health management plans is the cornerstone of profitable farms; prevention of microbial diseases by means of vaccination is an integral part of such a plan. In every production type and management system in small ruminants, microbial diseases have a major significance, hence their proper control must be based in good health management practices, including use of effective and safe vaccines. Development of various types of vaccines is evolving very quickly in recent years and the improvement of new type of vaccines offers prospects. The article reviews and discusses vaccination programs and latest advances in development of vaccines against diseases that cause major economic losses in small ruminants. Specifically, vaccination schedules for the following diseases are reviewed: bacterial abortion (abortion associated with Brucella melitensis, Campylobacter spp., Chlamydophila abortus, Coxiella burnetii, Salmonella abortus ovis or Salmonella brandenburg), caseous lymphadenitis, clostridial diseases, colibacillosis, contagious echtyma, epididymitis caused by Brucella ovis, footrot, mammary diseases (contagious agalactia, mastitis), paratuberculosis and respiratory diseases (respiratory disease caused by Mannheimia haemolytica or other Pasteurellaceae). Copyright © 2015 Elsevier B.V. All rights reserved.

  12. Gestational weight gain in women with systemic lupus erythematosus.

    Science.gov (United States)

    Eudy, A M; Siega-Riz, A M; Engel, S M; Franceschini, N; Howard, A G; Clowse, M E B; Petri, M

    2017-05-01

    Objective The objective of this study was to estimate the proportion of pregnant women with systemic lupus erythematosus meeting Institute of Medicine guidelines for gestational weight gain and determine correlates of adherence to guidelines. Methods Singleton, live births in the Hopkins Lupus Pregnancy Cohort 1987-2015 were included. Pre-pregnancy weight was the weight recorded 12 months prior to pregnancy/first trimester. Final weight was the last weight recorded in the third trimester. Adherence to Institute of Medicine guidelines (inadequate, adequate, or excessive) was based on pre-pregnancy body mass index. Fisher's exact test and analysis of variance determined factors associated with not meeting guidelines. Stepwise selection estimated predictors of gestational weight gain. Results Of the 211 pregnancies, 34%, 24% and 42% had inadequate, adequate and excessive gestational weight gain, respectively. In exploratory analyses, differences in Institute of Medicine adherence were observed by pre-pregnancy body mass index, race, elevated creatinine during pregnancy and pre-pregnancy blood pressure. Odds of inadequate and excessive gestational weight gain increased 12% with each 1 kg/m 2 increase in pre-pregnancy body mass index. Lower maternal education was associated with increased odds of inadequate and excessive gestational weight gain. Conclusions As in the general population, most women with systemic lupus erythematosus did not meet Institute of Medicine guidelines. Our results identified predictors of gestational weight gain to aid in targeted interventions to improve guideline adherence in this population.

  13. Advisory committee on immunization practices recommended immunization schedules for persons aged 0 through 18 years--United States, 2015.

    Science.gov (United States)

    Strikas, Raymond A

    2015-02-06

    Each year, the Advisory Committee on Immunization Practices (ACIP) reviews the recommended immunization schedules for persons aged 0 through 18 years to ensure that the schedules reflect current recommendations for Food and Drug Administration-licensed vaccines. In October 2014, ACIP approved the recommended immunization schedules for persons aged 0 through 18 years for 2015, which include several changes from the 2014 immunization schedules. For 2015, the figures, footnotes, and tables are being published on the CDC immunization schedule website (http://www.cdc.gov/vaccines/schedules/index.html). This provides readers electronic access to the most current version of the schedules and footnotes on the CDC website. Health care providers are advised to use figures, tables, and the combined footnotes together. Printable versions of the 2015 immunization schedules for persons aged 0 through 18 years also are available at the website in several formats, including portrait, landscape, and pocket-sized versions. Ordering instructions for laminated versions and "parent-friendly" schedules also are available at the immunization schedule website.

  14. Integrating Preventive Maintenance Scheduling As Probability Machine Failure And Batch Production Scheduling

    Directory of Open Access Journals (Sweden)

    Zahedi Zahedi

    2016-06-01

    Full Text Available This paper discusses integrated model of batch production scheduling and machine maintenance scheduling. Batch production scheduling uses minimize total actual flow time criteria and machine maintenance scheduling uses the probability of machine failure based on Weibull distribution. The model assumed no nonconforming parts in a planning horizon. The model shows an increase in the number of the batch (length of production run up to a certain limit will minimize the total actual flow time. Meanwhile, an increase in the length of production run will implicate an increase in the number of PM. An example was given to show how the model and algorithm work.

  15. Schedules of controlled substances: placement of 5-methoxy-N,N-dimethyltryptamine into Schedule I of the Controlled Substances Act. Final rule.

    Science.gov (United States)

    2010-12-20

    With the issuance of this final rule, the Deputy Administrator of the Drug Enforcement Administration (DEA) places the substance 5-methoxy-N,N-dimethyltryptamine (5-MeO-DMT), including its salts, isomers and salts of isomers whenever the existence of such salts, isomers, and salts of isomers is possible, into schedule I of the Controlled Substances Act (CSA). This action by the DEA Deputy Administrator is based on a scheduling recommendation from the Assistant Secretary for Health of the Department of Health and Human Services (DHHS) and a DEA review indicating that 5-MeO-DMT meets the criteria for placement in schedule I of the CSA. This final rule will impose the criminal sanctions and regulatory controls of schedule I substances under the CSA on the manufacture, distribution, dispensing, importation, exportation, and possession of 5-MeO-DMT.

  16. Refixation saccades with normal gain values

    DEFF Research Database (Denmark)

    Korsager, Leise Elisabeth Hviid; Faber, Christian Emil; Schmidt, Jesper Hvass

    2017-01-01

    Refixation saccades with normal gain value occur more frequently with increasing age. The phenomenon has also been observed in different vestibular disorders. In this case, we present a young male with normal gain value and refixation saccades tested with the video head impulse test (vHIT) the day...

  17. Gain Shift Corrections at Chi-Nu

    Energy Technology Data Exchange (ETDEWEB)

    Brown, Tristan Brooks [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Univ. of Massachusetts, Lowell, MA (United States). Dept. of Physics and Applied Physics; Devlin, Matthew James [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2016-08-30

    Ambient conditions have the potential to cause changes in liquid scintillator detector gain that vary with time and temperature. These gain shifts can lead to poor resolution in both energy as well as pulse shape discrimination. In order to correct for these shifts in the Chi-Nu high energy array, a laser system has been developed for calibration of the pulse height signals.

  18. Evaluating realized genetic gains from tree improvement.

    Science.gov (United States)

    J.B. St. Clair

    1993-01-01

    Tree improvement has become an essential part of the management of forest lands for wood production, and predicting yields and realized gains from forests planted with genetically-improved trees will become increasingly important. This paper discusses concepts of tree improvement and genetic gain important to growth and yield modeling, and reviews previous studies of...

  19. Enhanced Gain in Photonic Crystal Amplifiers

    DEFF Research Database (Denmark)

    Ek, Sara; Semenova, Elizaveta; Hansen, Per Lunnemann

    2012-01-01

    We experimentally demonstrate enhanced gain in the slow-light regime of quantum well photonic crystal amplifiers. A strong gain enhancement is observed with the increase of the group refractive index, due to light slow-down. The slow light enhancement is shown in a amplified spontaneous emission...

  20. Maximum gain of Yagi-Uda arrays

    DEFF Research Database (Denmark)

    Bojsen, J.H.; Schjær-Jacobsen, Hans; Nilsson, E.

    1971-01-01

    Numerical optimisation techniques have been used to find the maximum gain of some specific parasitic arrays. The gain of an array of infinitely thin, equispaced dipoles loaded with arbitrary reactances has been optimised. The results show that standard travelling-wave design methods are not optimum...

  1. Schedule goals for civilian radioactive waste management - Can we have confidence?

    International Nuclear Information System (INIS)

    Bartlett, John W.

    1992-01-01

    The schedule goals for the Civilian Radioactive Waste Management Program are to begin spent fuel receipt from reactors in 1998 and to begin waste disposal in 2010. Although there are various reasons for these goals, the most important is to set demanding goals and be responsible for achieving them. Meeting these goals requires taking into account an array of facilitators and potential inhibitors that affect schedule confidence. Facilitators include actions to prioritize the program, and make its operations efficient. These include actions to baseline activities, emphasize communications with constituencies, use help from others, and facilitate the licensing process. Inhibitors include problems in monitored storage facilities negotiations, obstruction by the State of Nevada, funding deficiencies, and technical uncertainties at Yucca Mountain. At the present time, the program can, in principle meet its schedule goals. In the near-term, the linchpin of schedule confidence is Congressional action to match the Administration's commitment to progress. (author)

  2. Gain control mechanisms in spinal motoneurons

    Directory of Open Access Journals (Sweden)

    Michael David Johnson

    2014-07-01

    Full Text Available Motoneurons provide the only conduit for motor commands to reach muscles. For many years, motoneurons were in fact considered to be little more than passive wires. Systematic studies in the past 25 years however have clearly demonstrated that the intrinsic electrical properties of motoneurons are under strong neuromodulatory control via multiple sources. The discovery of potent neuromodulation from the brainstem and its ability to change the gain of motoneurons shows that the passive view of the motor output stage is no longer tenable. A mechanism for gain control at the motor output stage makes good functional sense considering our capability of generating an enormous range of forces, from very delicate (e.g. putting in a contact lens to highly forceful (emergency reactions. Just as sensory systems need gain control to deal with a wide dynamic range of inputs, so to might motor output need gain control to deal with the wide dynamic range of the normal movement repertoire. Two problems emerge from the potential use of the brainstem monoaminergic projection to motoneurons for gain control. First, the projection is highly diffuse anatomically, so that independent control of the gains of different motor pools is not feasible. In fact, the system is so diffuse that gain for all the motor pools in a limb likely increases in concert. Second, if there is a system that increases gain, probably a system to reduce gain is also needed. In this review, we summarize recent studies that show local inhibitory circuits within the spinal cord, especially reciprocal and recurrent inhibition, have the potential to solve both of these problems as well as constitute another source of gain modulation.

  3. An EV Charging Scheduling Mechanism Based on Price Negotiation

    Directory of Open Access Journals (Sweden)

    Baocheng Wang

    2018-05-01

    Full Text Available Scheduling EV user’s charging behavior based on charging price and applying renewable energy resources are the effective methods to release the load pressure of power grids brought about by the large-scale popularity of electric vehicles (EVs. This paper presents a novel approach for EV charging scheduling based on price negotiation. Firstly, the EV charging system framework based on price negotiation and renewable energy resources is discussed. Secondly, the price negotiation model is presented, including the initial price models and the conditions of transactions. Finally, an EV charging scheduling mechanism based on price negotiation (CSM-PN, including the price adjustment strategies of both the operator and EV users is proposed to seek a final transaction during multi-round price negotiation. Simulation results show that this novel approach can effectively improve the charging station operator’s income, reduce the EV users’ costs, and balance the load of the power grid while improving the efficiency of the EV charging system.

  4. Efficient mixed integer programming models for family scheduling problems

    Directory of Open Access Journals (Sweden)

    Meng-Ye Lin

    Full Text Available This paper proposes several mixed integer programming models which incorporate optimal sequence properties into the models, to solve single machine family scheduling problems. The objectives are total weighted completion time and maximum lateness, respectively. Experiment results indicate that there are remarkable improvements in computational efficiency when optimal sequence properties are included in the models. For the total weighted completion time problems, the best model solves all of the problems up to 30-jobs within 5 s, all 50-job problems within 4 min and about 1/3 of the 75-job to 100-job problems within 1 h. For maximum lateness problems, the best model solves almost all the problems up to 30-jobs within 11 min and around half of the 50-job to 100-job problems within 1 h. Keywords: Family scheduling, Sequence independent setup, Total weighted completion time, Maximum lateness

  5. Interventions for preventing excessive weight gain during pregnancy

    Science.gov (United States)

    Muktabhant, Benja; Lumbiganon, Pisake; Ngamjarus, Chetta; Dowswell, Therese

    2014-01-01

    Background Excessive weight gain during pregnancy is associated with multiple maternal and neonatal complications. However, interventions to prevent excessive weight gain during pregnancy have not been adequately evaluated. Objectives To evaluate the effectiveness of interventions for preventing excessive weight gain during pregnancy and associated pregnancy complications. Search methods We searched the Cochrane Pregnancy and Childbirth Group’s Trials Register (20 October 2011) and MEDLINE (1966 to 20 October 2011). Selection criteria All randomised controlled trials and quasi-randomised trials of interventions for preventing excessive weight gain during pregnancy. Data collection and analysis We assessed for inclusion all potential studies we identified as a result of the search strategy. At least two review authors independently assessed trial quality and extracted data. We resolved discrepancies through discussion. We have presented results using risk ratio (RR) for categorical data and mean difference for continuous data. We analysed data using a fixed-effect model. Main results We included 28 studies involving 3976 women; 27 of these studies with 3964 women contributed data to the analyses. Interventions focused on a broad range of interventions. However, for most outcomes we could not combine data in a meta-analysis, and where we did pool data, no more than two or three studies could be combined for a particular intervention and outcome. Overall, results from this review were mainly not statistically significant, and where there did appear to be differences between intervention and control groups, results were not consistent. For women in general clinic populations one (behavioural counselling versus standard care) of three interventions examined was associated with a reduction in the rate of excessive weight gain (RR 0.72, 95% confidence interval 0.54 to 0.95); for women in high-risk groups no intervention appeared to reduce excess weight gain. There were

  6. Scheduling for dual-hop block-fading channels with two source-user pairs sharing one relay

    KAUST Repository

    Zafar, Ammar

    2013-09-01

    In this paper, we maximize the achievable rate region of a dual-hop network with two sources serving two users independently through a single shared relay. We formulate the problem as maximizing the sum of the weighted long term average throughputs of the two users under stability constraints on the long term throughputs of the source-user pairs. In order to solve the problem, we propose a joint user-and-hop scheduling scheme, which schedules the first or second hop opportunistically based on instantaneous channel state information, in order to exploit multiuser diversity and multihop diversity gains. Numerical results show that the proposed joint scheduling scheme enhances the achievable rate region as compared to a scheme that employs multi-user scheduling on the second-hop alone. Copyright © 2013 by the Institute of Electrical and Electronic Engineers, Inc.

  7. Distributed Hybrid Scheduling in Multi-Cloud Networks using Conflict Graphs

    KAUST Repository

    Douik, Ahmed

    2017-09-07

    Recent studies on cloud-radio access networks assume either signal-level or scheduling-level coordination. This paper considers a hybrid coordinated scheme as a means to benefit from both policies. Consider the downlink of a multi-cloud radio access network, where each cloud is connected to several base-stations (BSs) via high capacity links, and, therefore, allows for joint signal processing within the cloud transmission. Across the multiple clouds, however, only scheduling-level coordination is permitted, as low levels of backhaul communication are feasible. The frame structure of every BS is composed of various time/frequency blocks, called power-zones (PZs), which are maintained at a fixed power level. The paper addresses the problem of maximizing a network-wide utility by associating users to clouds and scheduling them to the PZs, under the practical constraints that each user is scheduled to a single cloud at most, but possibly to many BSs within the cloud, and can be served by one or more distinct PZs within the BSs’ frame. The paper solves the problem using graph theory techniques by constructing the conflict graph. The considered scheduling problem is, then, shown to be equivalent to a maximum-weight independent set problem in the constructed graph, which can be solved using efficient techniques. The paper then proposes solving the problem using both optimal and heuristic algorithms that can be implemented in a distributed fashion across the network. The proposed distributed algorithms rely on the well-chosen structure of the constructed conflict graph utilized to solve the maximum-weight independent set problem. Simulation results suggest that the proposed optimal and heuristic hybrid scheduling strategies provide appreciable gain as compared to the scheduling-level coordinated networks, with a negligible degradation to signal-level coordination.

  8. Soft measures and incremental gains in mines; Mesures douces et gains incrementaux : mines

    Energy Technology Data Exchange (ETDEWEB)

    Laliberte, P. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Mining and Mineral Sciences Laboratories

    2008-07-01

    This paper presented a variety of measures that mine operators can adopt to save energy. Researchers at the CANMET Mining and Mineral Sciences Laboratories of Natural Resources Canada have conducted a joint study with Hydro-Quebec to investigate the impact of alternate energy technologies and control systems on energy savings. The impacts of a range of technologies were evaluated and rates of energy efficiency were compared. Technologies included hybrid vehicles; fuel cell-powered vehicles; automated ventilation control systems; heat recovery; compressed air; and electrical mining equipment. Energy profiles for various industrial applications were included. This paper also provided details of computerized simulations currently being conducted to estimate the potential incremental gains associated with the use of technology innovations in mining applications. 9 tabs., 3 figs.

  9. Maternal Nonstandard Work Schedules and Breastfeeding Behaviors.

    Science.gov (United States)

    Zilanawala, Afshin

    2017-06-01

    Objectives Although maternal employment rates have increased in the last decade in the UK, there is very little research investigating the linkages between maternal nonstandard work schedules (i.e., work schedules outside of the Monday through Friday, 9-5 schedule) and breastfeeding initiation and duration, especially given the wide literature citing the health advantages of breastfeeding for mothers and children. Methods This paper uses a population-based, UK cohort study, the Millennium Cohort Study (n = 17,397), to investigate the association between types of maternal nonstandard work (evening, night, away from home overnight, and weekends) and breastfeeding behaviors. Results In unadjusted models, exposure to evening shifts was associated with greater odds of breastfeeding initiation (OR 1.71, CI 1.50-1.94) and greater odds of short (OR 1.55, CI 1.32-1.81), intermediate (OR 2.01, CI 1.64-2.47), prolonged partial duration (OR 2.20, CI 1.78-2.72), and prolonged exclusive duration (OR 1.53, CI 1.29-1.82), compared with mothers who were unemployed and those who work other types of nonstandard shifts. Socioeconomic advantage of mothers working evening schedules largely explained the higher odds of breastfeeding initiation and duration. Conclusions Socioeconomic characteristics explain more breastfeeding behaviors among mothers working evening shifts. Policy interventions to increase breastfeeding initiation and duration should consider the timing of maternal work schedules.

  10. Empirical results on scheduling and dynamic backtracking

    Science.gov (United States)

    Boddy, Mark S.; Goldman, Robert P.

    1994-01-01

    At the Honeywell Technology Center (HTC), we have been working on a scheduling problem related to commercial avionics. This application is large, complex, and hard to solve. To be a little more concrete: 'large' means almost 20,000 activities, 'complex' means several activity types, periodic behavior, and assorted types of temporal constraints, and 'hard to solve' means that we have been unable to eliminate backtracking through the use of search heuristics. At this point, we can generate solutions, where solutions exist, or report failure and sometimes why the system failed. To the best of our knowledge, this is among the largest and most complex scheduling problems to have been solved as a constraint satisfaction problem, at least that has appeared in the published literature. This abstract is a preliminary report on what we have done and how. In the next section, we present our approach to treating scheduling as a constraint satisfaction problem. The following sections present the application in more detail and describe how we solve scheduling problems in the application domain. The implemented system makes use of Ginsberg's Dynamic Backtracking algorithm, with some minor extensions to improve its utility for scheduling. We describe those extensions and the performance of the resulting system. The paper concludes with some general remarks, open questions and plans for future work.

  11. Interoceanic canal excavation scheduling via computer simulation

    International Nuclear Information System (INIS)

    Baldonado, Orlino C.

    1970-01-01

    The computer simulation language GPSS/360 was used to simulate the schedule of several nuclear detonation programs for the interoceanic canal project. The effects of using different weather restriction categories due to air blast and fallout were investigated. The effect of increasing the number of emplacement and stemming crews and the effect of varying the reentry period after detonating a row charge or salvo were also studied. Detonation programs were simulated for the proposed Routes 17A and 25E. The study demonstrates the method of using computer simulation so that a schedule and its associated constraints can be assessed for feasibility. Since many simulation runs can be made for a given set of detonation program constraints, one readily obtains an average schedule for a range of conditions. This provides a method for analyzing time-sensitive operations so that time and cost-effective operational schedules can be established. A comparison of the simulated schedules with those that were published shows them to be similar. (author)

  12. Realistic Scheduling Mechanism for Smart Homes

    Directory of Open Access Journals (Sweden)

    Danish Mahmood

    2016-03-01

    Full Text Available In this work, we propose a Realistic Scheduling Mechanism (RSM to reduce user frustration and enhance appliance utility by classifying appliances with respective constraints and their time of use effectively. Algorithms are proposed regarding functioning of home appliances. A 24 hour time slot is divided into four logical sub-time slots, each composed of 360 min or 6 h. In these sub-time slots, only desired appliances (with respect to appliance classification are scheduled to raise appliance utility, restricting power consumption by a dynamically modelled power usage limiter that does not only take the electricity consumer into account but also the electricity supplier. Once appliance, time and power usage limiter modelling is done, we use a nature-inspired heuristic algorithm, Binary Particle Swarm Optimization (BPSO, optimally to form schedules with given constraints representing each sub-time slot. These schedules tend to achieve an equilibrium amongst appliance utility and cost effectiveness. For validation of the proposed RSM, we provide a comparative analysis amongst unscheduled electrical load usage, scheduled directly by BPSO and RSM, reflecting user comfort, which is based upon cost effectiveness and appliance utility.

  13. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  14. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    Energy Technology Data Exchange (ETDEWEB)

    Bisping, Lynn E.

    2006-01-27

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12).

  15. Hanford Site Environmental Surveillance Master Sampling Schedule for Calendar Year 2006

    International Nuclear Information System (INIS)

    Bisping, Lynn E.

    2006-01-01

    This document contains the calendar year 2006 schedules for the routine and non-routine collection of samples for the Surface Environmental Surveillance Project (SESP) and Drinking Water Monitoring Project. Each section includes sampling locations, sample types, and analyses to be performed. In some cases, samples are scheduled on a rotating basis and may not be collected in 2006 in which case the anticipated year for collection is provided. The project document package (PDP) for Surface Environmental Surveillance contains the milestone control log for the issuing of CY06 Environmental Surveillance Master Sampling Schedule WBS 4.2.3.21.3.03, milestone: RL00430306 (4830106-12)

  16. Embedded multiprocessors scheduling and synchronization

    CERN Document Server

    Sriram, Sundararajan

    2009-01-01

    Techniques for Optimizing Multiprocessor Implementations of Signal Processing ApplicationsAn indispensable component of the information age, signal processing is embedded in a variety of consumer devices, including cell phones and digital television, as well as in communication infrastructure, such as media servers and cellular base stations. Multiple programmable processors, along with custom hardware running in parallel, are needed to achieve the computation throughput required of such applications. Reviews important research in key areas related to the multiprocessor implementation of multi

  17. Changes in job strain and subsequent weight gain

    DEFF Research Database (Denmark)

    Vesterlund, Gitte Kingo; Keller, Amélie Cléo; Heitmann, Berit Lilienthal

    2018-01-01

    as amount of influence. Setting: Employed nurses in Denmark. Subjects: We included a sub-sample of 6188 female nurses from the Danish Nurse Cohort, which consisted of the nurses who participated in surveys in 1993, 1999 and 2009. Results: A linear trend in weight gain was seen in nurses who were often busy...

  18. Maternal weight gain in second and third trimesters and their ...

    African Journals Online (AJOL)

    Multiple linear regression analysis was used to determine the relative contributions of some selected maternal variables. (independent variables) to the infant's birth weight. (dependent variable). The selected maternal variables included age, height, weight, gestational period and weight gain at second and third trimesters.

  19. Attitude shifts and knowledge gains: Evaluating men who have sex ...

    African Journals Online (AJOL)

    2017-03-31

    Mar 31, 2017 ... Attitude shifts and knowledge gains: Evaluating men who have sex with men sensitisation training for healthcare workers in the. Western Cape, South Africa. ... (including gender expression and sexual practices) may change over time (e.g. from adolescence ...... Alcohol and sexual risk behavior among.

  20. Gains of integrating sector-wise pollution regulation

    DEFF Research Database (Denmark)

    Jacobsen, Lars Bo; Nielsen, Max; Nielsen, Rasmus

    2016-01-01

    This paper extends the Orani-G Computable General Equilibrium model with an externality market. The externality market is modelled with a limited number of pollution permits that are traded between representative firms in different sectors. The model is applied to identify the gains of a common...... of introducing more coherent regulatory frameworks that include all polluters under the same regulatory system....

  1. Intrinsic gain modulation and adaptive neural coding.

    Directory of Open Access Journals (Sweden)

    Sungho Hong

    2008-07-01

    Full Text Available In many cases, the computation of a neural system can be reduced to a receptive field, or a set of linear filters, and a thresholding function, or gain curve, which determines the firing probability; this is known as a linear/nonlinear model. In some forms of sensory adaptation, these linear filters and gain curve adjust very rapidly to changes in the variance of a randomly varying driving input. An apparently similar but previously unrelated issue is the observation of gain control by background noise in cortical neurons: the slope of the firing rate versus current (f-I curve changes with the variance of background random input. Here, we show a direct correspondence between these two observations by relating variance-dependent changes in the gain of f-I curves to characteristics of the changing empirical linear/nonlinear model obtained by sampling. In the case that the underlying system is fixed, we derive relationships relating the change of the gain with respect to both mean and variance with the receptive fields derived from reverse correlation on a white noise stimulus. Using two conductance-based model neurons that display distinct gain modulation properties through a simple change in parameters, we show that coding properties of both these models quantitatively satisfy the predicted relationships. Our results describe how both variance-dependent gain modulation and adaptive neural computation result from intrinsic nonlinearity.

  2. Considerations for Using an Incremental Scheduler for Human Exploration Task Scheduling

    Science.gov (United States)

    Jaap, John; Phillips, Shaun

    2005-01-01

    As humankind embarks on longer space missions farther from home, the requirements and environments for scheduling the activities performed on these missions are changing. As we begin to prepare for these missions it is appropriate to evaluate the merits and applicability of the different types of scheduling engines. Scheduling engines temporally arrange tasks onto a timeline so that all constraints and objectives are met and resources are not overbooked. Scheduling engines used to schedule space missions fall into three general categories: batch, mixed-initiative, and incremental. This paper presents an assessment of the engine types, a discussion of the impact of human exploration of the moon and Mars on planning and scheduling, and the applicability of the different types of scheduling engines. This paper will pursue the hypothesis that incremental scheduling engines may have a place in the new environment; they have the potential to reduce cost, to improve the satisfaction of those who execute or benefit from a particular timeline (the customers), and to allow astronauts to plan their own tasks.

  3. Parents' Family Time and Work Schedules: The Split-Shift Schedule in Spain

    NARCIS (Netherlands)

    Gracia, P.; Kalmijn, M.

    2016-01-01

    This study used data on couples from the 2003 Spanish Time Use Survey (N = 1,416) to analyze how work schedules are associated with family, couple, parent–child, and non-family leisure activities. Spain is clearly an interesting case for the institutionalized split-shift schedule, a long lunch break

  4. A master surgical scheduling approach for cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, Jeroen M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    This paper addresses the problem of operating room (OR) scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time-consuming, tedious, and complex task. The stochasticity of the durations of surgical procedures

  5. A model for generating master surgical schedules to allow cyclic scheduling in operating room departments

    NARCIS (Netherlands)

    van Oostrum, J.M.; van Houdenhoven, M.; Hurink, Johann L.; Hans, Elias W.; Wullink, Gerhard; Kazemier, G.

    2005-01-01

    This paper addresses the problem of operating room scheduling at the tactical level of hospital planning and control. Hospitals repetitively construct operating room schedules, which is a time consuming tedious and complex task. The stochasticity of the durations of surgical procedures complicates

  6. The Probability of Small Schedule Values and Preference for Random-Interval Schedules

    Science.gov (United States)

    Soreth, Michelle Ennis; Hineline, Philip N.

    2009-01-01

    Preference for working on variable schedules and temporal discrimination were simultaneously examined in two experiments using a discrete-trial, concurrent-chains arrangement with fixed interval (FI) and random interval (RI) terminal links. The random schedule was generated by first sampling a probability distribution after the programmed delay to…

  7. 76 FR 77895 - Schedules of Controlled Substances: Placement of Ezogabine Into Schedule V

    Science.gov (United States)

    2011-12-15

    ... medical use, and the degree of dependence the substance may cause, 21 U.S.C. 812. The initial schedules of... with this finding of conditions of public health and of good cause to waive the 30 day period and... of Schedule IV substances such as alprazolam can range from mild dysphoria and insomnia to a major...

  8. Scheduling algorithms for rapid imaging using agile Cubesat constellations

    Science.gov (United States)

    Nag, Sreeja; Li, Alan S.; Merrick, James H.

    2018-02-01

    optimality of the dynamic programming solution for single satellites was within 10%, and find up to 5% more optimal solutions. The optimality gap for constellations was found to be 22% at worst, but the dynamic programming schedules were found at nearly four orders of magnitude better computational speed than integer programming. The algorithm can include cloud cover predictions, ground downlink windows or any other spatial, temporal or angular constraints into the orbital module and be integrated into planning tools for agile constellations.

  9. Integrated scheduled waste management system in Kuala Lumpur ...

    African Journals Online (AJOL)

    GREGORY

    2011-12-16

    Dec 16, 2011 ... requirements, packaging requirements, impact of scheduled wastes, recycling of scheduled wastes and recommendations. Besides ... specifically excludes municipal solid waste and municipal sewage. Scheduled wastes are ... scheduled waste generated in Kuala Lumpur (KL) and service provided for ...

  10. Topology-based hierarchical scheduling using deficit round robin

    DEFF Research Database (Denmark)

    Yu, Hao; Yan, Ying; Berger, Michael Stubert

    2009-01-01

    This paper proposes a topology-based hierarchical scheduling scheme using Deficit Round Robin (DRR). The main idea of the topology-based hierarchical scheduling is to map the topology of the connected network into the logical structure of the scheduler, and combine several token schedulers accord...... of malicious traffic. This is significant for IPTV services in Carrier Ethernet networks....

  11. A Priority-Based Budget Scheduler with Conservative Dataflow Model

    NARCIS (Netherlands)

    Steine, Marcel; Bekooij, Marco Jan Gerrit; Wiggers, M.H.

    2009-01-01

    Currently, the guaranteed throughput of a stream processing application, mapped on a multi-processor system, can be computed with a conservative dataflow model, if only time division multiplex (TDM) schedulers are applied. A TDM scheduler is a budget scheduler. Budget schedulers can be characterized

  12. Physician counseling of young adults with rapid weight gain: a retrospective cohort study

    Directory of Open Access Journals (Sweden)

    Thompson Jason

    2010-04-01

    Full Text Available Abstract Background The incidence of weight gain is highest during young adulthood. Our study aims to describe weight gain patterns among young adults and to evaluate physician recognition of and counseling for rapid weight gain. Methods This retrospective cohort study included patients ages 18-35 at an academic internal medicine clinic between 2004-2008. We conducted chart reviews to determine weight change over time, whether weight gain greater than 3 lbs/year was documented, whether counseling was provided, and whether patients became overweight. We categorized weight gain documentation by location on the problem list, encounter diagnosis, or note text. We categorized counseling as weight-specific or general diet and exercise counseling. We used Chi-square tests to evaluate the relationship between weight change over time and the following variables: gender, diagnosis of weight gain, and counseling for weight gain. Fisher's Exact test was used to test for an association between diagnosis and counseling category. Results The study included 365 patients. Weight gain was greater than 3 lbs/year for 24% (90/365 of patients, of whom 56 (15% gained 3-5.9 lbs/year, and 34 (9% gained more than 6 lbs/year. Among patients gaining more than 3 lbs/year, physicians documented weight gain as a problem in only 10% (9/90. Of the 9 patients for whom weight gain was documented, physicians provided weight-specific counseling in three, and general diet and exercise counseling in four. Of the 81 individuals with no documented diagnosis of weight gain, 63% had no documented counseling, but 34% received general diet and exercise counseling. Among patients with over 180 days of follow-up, 8% (10/126 became overweight. Conclusions Physicians infrequently recognize or counsel for weight gain among young adult patients. Improving identification of patients with rapid weight gain can provide an opportunity for tailored weight-related counseling.

  13. Cycle 24 COS FUV Detector Gain Maps

    Science.gov (United States)

    Sahnow, David

    2018-02-01

    Program 14519 used the onboard deuterium lamp to illuminate the LP3 region of the COS FUV detector immediately before and after the nominal high voltage on Segment B was changed on October 17, 2016. Exposures were also taken at LP2 approximately one year after the previous LP2 gain maps were obtained, and at LP3 using the G130M/1222 high voltage values. The pulse height information obtained was used to create gain maps in order to monitor the detector gain sag and to determine when high voltage changes and Lifetime Position changes were needed.

  14. Point Information Gain and Multidimensional Data Analysis

    Directory of Open Access Journals (Sweden)

    Renata Rychtáriková

    2016-10-01

    Full Text Available We generalize the point information gain (PIG and derived quantities, i.e., point information gain entropy (PIE and point information gain entropy density (PIED, for the case of the Rényi entropy and simulate the behavior of PIG for typical distributions. We also use these methods for the analysis of multidimensional datasets. We demonstrate the main properties of PIE/PIED spectra for the real data with the examples of several images and discuss further possible utilizations in other fields of data processing.

  15. Energy Gaining Windows for Residental Buildings

    DEFF Research Database (Denmark)

    Kragh, Jesper; Laustsen, Jacob Birck; Svendsen, Svend

    2008-01-01

    This paper presents some of the research done during the last 8 years at the Technical University of Denmark developing improved low-energy window solutions. The focus has been on maximizing the net energy gain of windows for residential buildings. The net energy gain of windows is the solar gain...... window is made of fiber-reinforced plastic (plastic reinforced by fine fibers made of glass). This composite material is a weatherproof material with very low thermal conductivity and high mechanical strength. These properties make the material very suitable for frame profiles due to lower heat loss...

  16. TCAD simulation of Low Gain Avalanche Detectors

    Energy Technology Data Exchange (ETDEWEB)

    Dalal, Ranjeet; Jain, Geetika; Bhardwaj, Ashutosh, E-mail: ashutosh.bhardwaj@cern.ch; Ranjan, Kirti

    2016-11-11

    In the present work, detailed simulation using Technology Computer Aided Design (TCAD) tool, Silvaco for non-irradiated and irradiated LGAD (Low Gain Avalanche Detector) devices has been carried out. The effects of different design parameters and proton irradiation on LGAD operation are discussed in detail. An already published effective two trap bulk damage model is used to simulate the radiation damage without implementing any acceptor removal term. The TCAD simulation for irradiated LGAD devices produce decreasing gain with increasing fluence, similar to the measurement results. The space charge density and electric field distribution are used to illustrate the possible reasons for the degradation of gain of the irradiated LGAD devices.

  17. TCAD simulation of Low Gain Avalanche Detectors

    International Nuclear Information System (INIS)

    Dalal, Ranjeet; Jain, Geetika; Bhardwaj, Ashutosh; Ranjan, Kirti

    2016-01-01

    In the present work, detailed simulation using Technology Computer Aided Design (TCAD) tool, Silvaco for non-irradiated and irradiated LGAD (Low Gain Avalanche Detector) devices has been carried out. The effects of different design parameters and proton irradiation on LGAD operation are discussed in detail. An already published effective two trap bulk damage model is used to simulate the radiation damage without implementing any acceptor removal term. The TCAD simulation for irradiated LGAD devices produce decreasing gain with increasing fluence, similar to the measurement results. The space charge density and electric field distribution are used to illustrate the possible reasons for the degradation of gain of the irradiated LGAD devices.

  18. User gains and PD aims

    DEFF Research Database (Denmark)

    Bossen, Claus; Dindler, Christian; Iversen, Ole Sejer

    2010-01-01

    We present a study of user gains from their participation in a participatory design (PD) project at Danish primary schools. We explore user experiences and reported gains from the project in relation to the multiple aims of PD, based on a series of interviews with pupils, teachers, administrators...... relationships among people, stretching across organizations and project groups. Moreover, we demonstrate how users' gains related to their acting within these networks. These results suggest a heightened focus on the indirect and distributed channels through which the long-term impact of PD emerges....

  19. TCAD simulation of Low Gain Avalanche Detectors

    Science.gov (United States)

    Dalal, Ranjeet; Jain, Geetika; Bhardwaj, Ashutosh; Ranjan, Kirti

    2016-11-01

    In the present work, detailed simulation using Technology Computer Aided Design (TCAD) tool, Silvaco for non-irradiated and irradiated LGAD (Low Gain Avalanche Detector) devices has been carried out. The effects of different design parameters and proton irradiation on LGAD operation are discussed in detail. An already published effective two trap bulk damage model is used to simulate the radiation damage without implementing any acceptor removal term. The TCAD simulation for irradiated LGAD devices produce decreasing gain with increasing fluence, similar to the measurement results. The space charge density and electric field distribution are used to illustrate the possible reasons for the degradation of gain of the irradiated LGAD devices.

  20. Nonunity gain minimal-disturbance measurement

    DEFF Research Database (Denmark)

    Sabuncu, Metin; Mišta, L.; Fiurášek, J.

    2007-01-01

    We propose and experimentally demonstrate an optimal nonunity gain Gaussian scheme for partial measurement of an unknown coherent state that causes minimal disturbance of the state. The information gain and the state disturbance are quantified by the noise added to the measurement outcomes and to...... and to the output state, respectively. We derive the optimal trade-off relation between the two noises and we show that the tradeoff is saturated by nonunity gain teleportation. Optimal partial measurement is demonstrated experimentally using a linear optics scheme with feedforward....

  1. Integrated Job Scheduling and Network Routing

    DEFF Research Database (Denmark)

    Gamst, Mette; Pisinger, David

    2013-01-01

    -Wolfe decomposition is presented. The pricing problem is the linear multicommodity flow problem defined on a time-space network. Branching strategies are presented for the branchand-price algorithm and three heuristics and an exact solution method are implemented for finding a feasible start solution. Finally......We consider an integrated job scheduling and network routing problem which appears in Grid Computing and production planning. The problem is to schedule a number of jobs at a finite set of machines, such that the overall profit of the executed jobs is maximized. Each job demands a number...... of resources which must be sent to the executing machine through a network with limited capacity. A job cannot start before all of its resources have arrived at the machine. The scheduling problem is formulated as a Mixed Integer Program (MIP) and proved to be NP-hard. An exact solution approach using Dantzig...

  2. A scheduling algorithm based on Clara clustering

    Science.gov (United States)

    Kuang, Ling; Zhang, Lichen

    2017-08-01

    Task scheduling is a key issue in cloud computing. A new algorithm for queuing task scheduling based on Clara clustering and SJF cloud computing is proposed to introduce the Clara clustering for the shortcomings of SJF algorithm load imbalance. The Clara clustering method prepares the task clustering based on the task execution time and the waiting time of the task, and then divides the task into three groups according to the reference point obtained by the clustering. Based on the number of tasks per group in the proportion of the total number of tasks assigned to the implementation of the quota. Each queue team will perform task scheduling based on these quotas and SJF. The simulation results show that the algorithm has good load balancing and system performance.

  3. Program cost and schedule baseline; Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-11-01

    The purpose of this document is to establish quantitative expressions of proposed costs and schedule to serve as a basis for measurement of the Radioactive Waste Management Program performance. It identifies the components of the Program Cost and Schedule Baseline (PCSB) that will be subject to change control by the Executive Level (Level 0) and Program (Level 1) Change Control Boards (CCBs) and establishes their baseline values. This document also details PCSB reporting, monitoring, and corrective action requirements. The Program technical baseline contained in the Waste Management System Description (WMSD) and the Waste Management System Requirements (WMSR) documents provides the technical basis for the PCSB. The PCSB establishes baseline values for the Yucca Mountain Site Characterization Project cost and schedule through submittal of the license application to the Nuclear Regulatory Commission (NRC).

  4. Optimal joint scheduling of electrical and thermal appliances in a smart home environment

    International Nuclear Information System (INIS)

    Shirazi, Elham; Zakariazadeh, Alireza; Jadid, Shahram

    2015-01-01

    Highlights: • Thermal appliances are scheduled based on desired temperature and energy prices. • A discomfort index has been introduced within the home energy scheduling model. • Appliances are scheduled based on activity probability and desired options. • Starting probability depends on the social random factor and consumption behavior. - Abstract: With the development of home area network, residents have the opportunity to schedule their power usage in the home by themselves aiming at reducing electricity expenses. Moreover, as renewable energy sources are deployed in home, a home energy management system needs to consider both energy consumption and generation simultaneously to minimize the energy cost. In this paper, a smart home energy management model has been presented in which electrical and thermal appliances are jointly scheduled. The proposed method aims at minimizing the electricity cost of a residential customer by scheduling various type of appliances considering the residents consumption behavior, seasonal probability, social random factor, discomfort index and appliances starting probability functions. In this model, the home central controller receives the electricity price information, environmental factors data as well as the resident desired options in order to optimally schedule appliances including electrical and thermal. The scheduling approach is tested on a typical home including variety of home appliances, a small wind turbine, photovoltaic panel, combined heat and power unit, boiler and electrical and thermal storages over a 24-h period. The results show that the scheduling of different appliances can be reached simultaneously by using the proposed formulation. Moreover, simulation results evidenced that the proposed home energy management model exhibits a lower cost and, therefore, is more economical.

  5. Gain in Alzheimer care INstrument--a new scale to measure caregiving gains in dementia.

    Science.gov (United States)

    Yap, Philip; Luo, Nan; Ng, Wai Yee; Chionh, Hui Ling; Lim, June; Goh, Jenny

    2010-01-01

    To describe and validate a new scale, Gain in Alzheimer care Instrument (GAIN), and to measure gains in dementia caregiving. Items in GAIN were derived through a qualitative study of family carers of persons with dementia (PWD). Content validity of GAIN was established by a team of dementia care experts (geriatrician, nurse, and social worker) and through focus group discussion with 15 family carers. Consecutive carers of PWD were administered a questionnaire containing GAIN and other measures. Ambulatory dementia clinic of a tertiary hospital and the local Alzheimer's Association. Family carers of PWD. The psychometric properties of GAIN were examined, in particular, exploratory factor analysis and construct validity through correlation with extant measures; Positive Aspects of Caregiving (PAC), Dementia Management Strategies Scale (DMSS), and Zarit Burden Interview (ZBI). Two hundred thirty-eight English-speaking carers completed the survey. Mean age of carers was 50.1 year (standard deviation [SD] 10.1) and females (68.1%) and child carers (81.3%) comprised the majority. Mean GAIN score was 30.5 (SD 6.5). Internal consistency of GAIN by Cronbach's alpha was 0.89 and test-retest reliability (2 weeks) by Intraclass Correlation Coefficient was 0.70. GAIN correlated strongly with PAC (r = 0.68, df = 236, p 1 at 5.28, accounting for 52.8% of the variance. GAIN is a psychometrically reliable and valid instrument for measuring gains in dementia caregiving. It adds an important dimension to carer assessment in dementia.

  6. Early Mucosal Reactions During and After Head-and-Neck Radiotherapy: Dependence of Treatment Tolerance on Radiation Dose and Schedule Duration

    International Nuclear Information System (INIS)

    Fenwick, John D.; Lawrence, Geoff P.; Malik, Zafar; Nahum, Alan E.; Mayles, W. Philip M.

    2008-01-01

    Purpose: To more precisely localize the dose-time boundary between head-and-neck radiotherapy schedules inducing tolerable and intolerable early mucosal reactions. Methods and Materials: Total cell-kill biologically effective doses (BED CK ) have been calculated for 84 schedules, including incomplete repair effects, but making no other corrections for the effect of schedule duration T. [BED CK ,T] scatterplots are graphed, overlying BED CKboundary (T) curves on the plots and using discriminant analysis to optimize BED CKboundary (T) to best represent the boundary between the tolerable and intolerable schedules. Results: More overlap than expected is seen between the tolerable and intolerable treatments in the 84-schedule [BED CK ,T] scatterplot, but this was largely eliminated by removing gap and tolerated accelerating schedules from the plot. For the remaining 57 predominantly regular schedules, the BED CKboundary (T) boundary increases with increasing T (p = 0.0001), curving upwards significantly nonlinearly (p = 0.00007) and continuing to curve beyond 15 days (p = 0.035). The regular schedule BED CKboundary (T) boundary does not describe tolerability well for accelerating schedules (p = 0.002), with several tolerated accelerating schedules lying above the boundary where regular schedules would be intolerable. Gap schedule tolerability also is not adequately described by the regular schedule boundary (p = 0.04), although no systematic offset exists between the regular boundary and the overall gap schedule tolerability pattern. Conclusions: All schedules analyzed (regular, gap, and accelerating) with BED CK values below BED CKboundary (T)=69.5x(T/32.2)/sin((T/32.2) (radians) )-3.5Gy 10 (forT≤50 days) are tolerable, and many lying above the boundary are intolerable. The accelerating schedules analyzed were tolerated better overall than are the regular schedules with similar [BED CK ,T] values.

  7. A heuristic approach to incremental and reactive scheduling

    Science.gov (United States)

    Odubiyi, Jide B.; Zoch, David R.

    1989-01-01

    An heuristic approach to incremental and reactive scheduling is described. Incremental scheduling is the process of modifying an existing schedule if the initial schedule does not meet its stated initial goals. Reactive scheduling occurs in near real-time in response to changes in available resources or the occurrence of targets of opportunity. Only minor changes are made during both incremental and reactive scheduling because a goal of re-scheduling procedures is to minimally impact the schedule. The described heuristic search techniques, which are employed by the Request Oriented Scheduling Engine (ROSE), a prototype generic scheduler, efficiently approximate the cost of reaching a goal from a given state and effective mechanisms for controlling search.

  8. Automated mixed traffic vehicle control and scheduling study

    Science.gov (United States)

    Peng, T. K. C.; Chon, K.

    1976-01-01

    The operation and the expected performance of a proposed automatic guideway transit system which uses low speed automated mixed traffic vehicles (AMTVs) were analyzed. Vehicle scheduling and headway control policies were evaluated with a transit system simulation model. The effect of mixed traffic interference on the average vehicle speed was examined with a vehicle pedestrian interface model. Control parameters regulating vehicle speed were evaluated for safe stopping and passenger comfort. Some preliminary data on the cost and operation of an experimental AMTV system are included. These data were the result of a separate task conducted at JPL, and were included as background information.

  9. Waiting for scheduled surgery: A complex patient experience.

    Science.gov (United States)

    Carr, Tracey; Teucher, Ulrich; Casson, Alan G

    2017-03-01

    The aim of this study was to understand experiences of wait time among patients awaiting scheduled orthopaedic or cardiac surgery. Using a qualitative approach, 32 patients completed two interviews each regarding their wait time experiences, including effects of waiting. Patient experiences of wait time varied regardless of actual wait time and included reports of restriction, uncertainty, resignation, coping and opportunity. Participants' waiting experiences indicate a complex relationship between greater symptom severity and less tolerance for wait time. We suggest healthcare resources focus on alleviating the deleterious effects of waiting for certain patients rather than reducing absolute wait times.

  10. Long-term home care scheduling

    DEFF Research Database (Denmark)

    Gamst, Mette; Jensen, Thomas Sejr

    In several countries, home care is provided for certain citizens living at home. The long-term home care scheduling problem is to generate work plans spanning several days such that a high quality of service is maintained and the overall cost is kept as low as possible. A solution to the problem...... provides detailed information on visits and visit times for each employee on each of the covered days. We propose a branch-and-price algorithm for the long-term home care scheduling problem. The pricing problem generates one-day plans for an employee, and the master problem merges the plans with respect...

  11. Crane Scheduling for a Plate Storage

    DEFF Research Database (Denmark)

    Hansen, Jesper; Clausen, Jens

    2002-01-01

    Odense Steel Shipyard produces the worlds largest container ships. The first process of producing the steel ships is handling arrival and storage of steel plates until they are needed in production. This paper considers the problem of scheduling two cranes that carry out the movements of plates...... into, around and out of the storage. The system is required to create a daily schedule for the cranes, but also handle possible disruptions during the execution of the plan. The problem is solved with a Simulated Annealing algorithm....

  12. Anesthesiology Nurse Scheduling using Particle Swarm Optimization

    Directory of Open Access Journals (Sweden)

    Leopoldo Altamirano

    2012-02-01

    Full Text Available In this article we present an approach designed to solve a real world problem: the Anesthesiology Nurse Scheduling Problem (ANSP at a public French hospital. The anesthesiology nurses are one of the most shared resources in the hospital and we attempt to find a fair/balanced schedule for them, taking into account a set of constraints and the nursesarsquo; stated preferences, concerning the different shifts. We propose a particle swarm optimization algorithm to solve the ANSP. Finally, we compare our technique with previous results obtained using integer programming.

  13. A New Software for Management, Scheduling, and Optimization for the Light Hydrocarbon Pipeline Network System of Daqing Oilfield

    Directory of Open Access Journals (Sweden)

    Yongtu Liang

    2014-01-01

    Full Text Available This paper presents the new software which specifically developed based on Visual Studio 2010 for Daqing Oilfield China includes the most complex light hydrocarbon pipeline network system in Asia, has become a powerful auxiliary tool to manage field data, makes scheduling plans for batching operation, and optimizes pumping plans. Firstly, DMM for recording and managing field data is summarized. Then, the batch scheduling simulation module called SSM for the difficult batch-scheduling issues of the multiple-source pipeline network system is introduced. Finally, SOM, that is Scheduling Optimization Module, is indicated for solving the problem of the pumps being started up/shut-down frequently.

  14. Amplifying mirrors with saturated gain without and with a resonator

    DEFF Research Database (Denmark)

    Skettrup, Torben

    2007-01-01

    An investigation of amplifying mirrors with a view to their use in resonator structures has been performed. Both non-saturated and saturated amplifying mirrors are demonstrated. It was found that relatively high values of gain (typical 5-10 times) can be obtained even when saturation is taken...... into account. Several resonator structures containing from two up to four mirrors, some including beamsplitters, are investigated. It was found that the gain to a first approximation depends only on the ratio between the pumping power and the input power on the amplifying mirror. It was also found...... that the configuration with four mirrors is well suited as an amplifier device working as an optical transistor since high values of gain up to 40 times could be obtained....

  15. Gain Stabilization of SiPMs

    CERN Document Server

    Cvach, Jaroslav; Kvasnicka, Jiri; Polak, Ivo; van der Kraiij, Erik; Zalieckas, Justas

    2014-01-01

    The gain of SiPMs depends both on bias voltage and on temperature. For stable operations, both need to be kept constant. In an ILC calorimeter with millions of channels, this is a challenging task. It is, therefore, desirable to compensate for temperature variations by automatically readjusting the bias voltage. We have designed a bias voltage regulator board to achieve this task. We anticipate an uncertainty on the gain stability at the level of $< 1\\%$. First, we present measurements of the gain dependence on temperature and bias voltage for several SiPMs from three different manufacturers and determine their dV/dT dependence. Next, we demonstrate the performance of the gain stability with the bias voltage regulator test board on four SiPMs.

  16. Transient optical gain in germanium quantum wells

    Energy Technology Data Exchange (ETDEWEB)

    Chatterjee, Sangam; Lange, Christoph; Koester, Niko S.; Schaefer, Martin; Kira, Mackillo; Koch, Stephan W. [Faculty of Physics and Materials Sciences Center, Philipps-Universitaet Marburg (Germany); Chrastina, Daniel; Isella, Giovanni; Kaenel, Hans von [CNISM, Como (Italy); L-NESS, Dipartimento di Fisica del Politecnico di Milano, Como (Italy); Sigg, Hans [Laboratory for Micro and Nanotecnology, Paul Scherrer Institut, Villigen PSI (Switzerland)

    2010-07-01

    One of today's most-sought goals in semiconductor technology is the monolithic integration of microelectronics and photonics on Si. Optical gain is, in general, not expected for Si and Ge or its alloys due to the indirect nature of the band gap in this material system. Here, we show that Ge/SiGe QWs show transient optical gain and may thus be used as an optically-pumped amplifier at room temperature. Further, the nonequilibrium effects which govern the relaxation dynamics of the optically injected carrier distributions in this material were observed and analyzed using a microscopic many-body theory. Strong non-equilibrium gain was obtained on a sub-100 fs time scale. Long-lived gain arising from {gamma}-point transitions is overcompensated by a process bearing the character of free carrier absorption.

  17. Scheduling algorithm for data relay satellite optical communication based on artificial intelligent optimization

    Science.gov (United States)

    Zhao, Wei-hu; Zhao, Jing; Zhao, Shang-hong; Li, Yong-jun; Wang, Xiang; Dong, Yi; Dong, Chen

    2013-08-01

    Optical satellite communication with the advantages of broadband, large capacity and low power consuming broke the bottleneck of the traditional microwave satellite communication. The formation of the Space-based Information System with the technology of high performance optical inter-satellite communication and the realization of global seamless coverage and mobile terminal accessing are the necessary trend of the development of optical satellite communication. Considering the resources, missions and restraints of Data Relay Satellite Optical Communication System, a model of optical communication resources scheduling is established and a scheduling algorithm based on artificial intelligent optimization is put forwarded. According to the multi-relay-satellite, multi-user-satellite, multi-optical-antenna and multi-mission with several priority weights, the resources are scheduled reasonable by the operation: "Ascertain Current Mission Scheduling Time" and "Refresh Latter Mission Time-Window". The priority weight is considered as the parameter of the fitness function and the scheduling project is optimized by the Genetic Algorithm. The simulation scenarios including 3 relay satellites with 6 optical antennas, 12 user satellites and 30 missions, the simulation result reveals that the algorithm obtain satisfactory results in both efficiency and performance and resources scheduling model and the optimization algorithm are suitable in multi-relay-satellite, multi-user-satellite, and multi-optical-antenna recourses scheduling problem.

  18. Group Elevator Peak Scheduling Based on Robust Optimization Model

    OpenAIRE

    ZHANG, J.; ZONG, Q.

    2013-01-01

    Scheduling of Elevator Group Control System (EGCS) is a typical combinatorial optimization problem. Uncertain group scheduling under peak traffic flows has become a research focus and difficulty recently. RO (Robust Optimization) method is a novel and effective way to deal with uncertain scheduling problem. In this paper, a peak scheduling method based on RO model for multi-elevator system is proposed. The method is immune to the uncertainty of peak traffic flows, optimal scheduling is re...

  19. Master schedule for CY-1984 Hanford environmental surveillance routine sampling program

    International Nuclear Information System (INIS)

    Blumer, P.J.; Price, K.R.; Eddy, P.A.; Carlile, J.M.V.

    1983-12-01

    This report provides the current schedule of data collection for the routine Hanford environmental surveillance and ground-water Monitoring Programs at the Hanford Site. The purpose is to evaluate and report the levels of radioactive and nonradioactive pollutants in the Hanford environs. The routine sampling schedule provided herein does not include samples that are planned to be collected during FY-1984 in support of special studies, special contractor support programs, or for quality control purposes

  20. Two-Stage Multi-Objective Collaborative Scheduling for Wind Farm and Battery Switch Station

    OpenAIRE

    Zhe Jiang; Xueshan Han; Zhimin Li; Wenbo Li; Mengxia Wang; Mingqiang Wang

    2016-01-01

    In order to deal with the uncertainties of wind power, wind farm and electric vehicle (EV) battery switch station (BSS) were proposed to work together as an integrated system. In this paper, the collaborative scheduling problems of such a system were studied. Considering the features of the integrated system, three indices, which include battery swapping demand curtailment of BSS, wind curtailment of wind farm, and generation schedule tracking of the integrated system are proposed. In additio...