WorldWideScience

Sample records for incident management plans

  1. Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-06-01

    Kentucky s Highway Incident Management Strategic Plan consists of a mission statement, 4 goals, 16 objectives, and 49 action strategies. The action strategies are arranged by priority and recommended time frame for implementation. When implemented...

  2. Incident Management Organization succession planning stakeholder feedback

    Science.gov (United States)

    Anne E. Black

    2013-01-01

    This report presents complete results of a 2011 stakeholder feedback effort conducted for the National Wildfire Coordination Group (NWCG) Executive Board concerning how best to organize and manage national wildland fire Incident Management Teams in the future to meet the needs of the public, agencies, fire service and Team members. Feedback was collected from 858...

  3. Development of Kentucky's highway incident management strategic plan.

    Science.gov (United States)

    2005-05-01

    ven though Kentucky has undertaken many initiatives to improve specific aspects of incident management, there has never been a plan that establishes an overall framework for a systematic, statewide, multi-agency effort to improve the management of hi...

  4. A management plan for hospitals and medical centers facing radiation incidents.

    Science.gov (United States)

    Davari, Fereshteh; Zahed, Arash

    2015-09-01

    Nowadays, application of nuclear technology in different industries has largely expanded worldwide. Proportionately, the risk of nuclear incidents and the resulting injuries have, therefore, increased in recent years. Preparedness is an important part of the crisis management cycle; therefore efficient preplanning seems crucial to any crisis management plan. Equipped with facilities and experienced personnel, hospitals naturally engage with the response to disasters. The main purpose of our study was to present a practical management pattern for hospitals and medical centers in case they encounter a nuclear emergency. In this descriptive qualitative study, data were collected through experimental observations, sources like Safety manuals released by the International Atomic Energy Agency and interviews with experts to gather their ideas along with Delphi method for polling, and brainstorming. In addition, the 45 experts were interviewed on three targeted using brainstorming and Delphi method. We finally proposed a management plan along with a set of practicality standards for hospitals and medical centers to optimally respond to nuclear medical emergencies when a radiation incident happens nearby. With respect to the great importance of preparedness against nuclear incidents adoption and regular practice of nuclear crisis management codes for hospitals and medical centers seems quite necessary.

  5. A management plan for hospitals and medical centers facing radiation incidents

    Directory of Open Access Journals (Sweden)

    Fereshteh Davari

    2015-01-01

    Full Text Available Background: Nowadays, application of nuclear technology in different industries has largely expanded worldwide. Proportionately, the risk of nuclear incidents and the resulting injuries have, therefore, increased in recent years. Preparedness is an important part of the crisis management cycle; therefore efficient preplanning seems crucial to any crisis management plan. Equipped with facilities and experienced personnel, hospitals naturally engage with the response to disasters. The main purpose of our study was to present a practical management pattern for hospitals and medical centers in case they encounter a nuclear emergency. Materials and Methods: In this descriptive qualitative study, data were collected through experimental observations, sources like Safety manuals released by the International Atomic Energy Agency and interviews with experts to gather their ideas along with Delphi method for polling, and brainstorming. In addition, the 45 experts were interviewed on three targeted using brainstorming and Delphi method. Results: We finally proposed a management plan along with a set of practicality standards for hospitals and medical centers to optimally respond to nuclear medical emergencies when a radiation incident happens nearby. Conclusion: With respect to the great importance of preparedness against nuclear incidents adoption and regular practice of nuclear crisis management codes for hospitals and medical centers seems quite necessary.

  6. Development of a Traffic Management Decision Support Tool for Freeway Incident Traffic Management (FITM) Plan Deployment

    Science.gov (United States)

    2017-12-01

    Traffic incidents have long been recognized as the main contributor to congestion in highway networks. Thus, contending with non-recurrent congestion has been a priority task for most highway agencies over the past decades. Under most incident scenar...

  7. Incident Management: Process into Practice

    Science.gov (United States)

    Isaac, Gayle; Moore, Brian

    2011-01-01

    Tornados, shootings, fires--these are emergencies that require fast action by school district personnel, but they are not the only incidents that require risk management. The authors have introduced the National Incident Management System (NIMS) and the Incident Command System (ICS) and assured that these systems can help educators plan for and…

  8. Application of Real-Time Automated Traffic Incident Response Plan Management System: A Web Structure for the Regional Highway Network in China

    Directory of Open Access Journals (Sweden)

    Yongfeng Ma

    2014-01-01

    Full Text Available Traffic incidents, caused by various factors, may lead to heavy traffic delay and be harmful to traffic capacity of downstream sections. Traffic incident management (TIM systems have been developed widely to respond to traffic incidents intelligently and reduce the losses. Traffic incident response plans, as an important component of TIM, can effectively guide responders as to what and how to do in traffic incidents. In the paper, a real-time automated traffic incident response plan management system was developed, which could generate and manage traffic incident response plans timely and automatically. A web application structure and a physical structure were designed to implement and show these functions. A standard framework of data storage was also developed to save information about traffic incidents and generated response plans. Furthermore, a conformation survey and case-based reasoning (CBR were introduced to identify traffic incident and generate traffic incident response plans automatically, respectively. Twenty-three traffic crash-related incidents were selected and three indicators were used to measure the system performance. Results showed that 20 of 23 cases could be retrieved effectively and accurately. The system is practicable to generate traffic incident response plans and has been implemented in China.

  9. Incident Information Management Tool

    CERN Document Server

    Pejovic, Vladimir

    2015-01-01

    Flaws of\tcurrent incident information management at CMS and CERN\tare discussed. A new data\tmodel for future incident database is\tproposed and briefly described. Recently developed draft version of GIS-­‐based tool for incident tracking is presented.

  10. Traffic incident management resource management.

    Science.gov (United States)

    2009-01-01

    The necessity of a multi-disciplinary approach involving law enforcement, fire and rescue, transportation, towing and recovery, and others has been well-recognized and integrated into incident management operations. This same multidisciplinar...

  11. Critical incident stress management.

    Science.gov (United States)

    Lim, J J; Childs, J; Gonsalves, K

    2000-10-01

    Recent studies have indicated implementation of the CISM Program has impacted and reduced the cost of workers' compensation claims for stress related conditions and the number of lost work days (Ott, 1997; Western Management Consultants, 1996). Occupational health professionals need to be ready to develop and implement a comprehensive critical incident stress management process in anticipation of a major event. The ability to organize, lead, or administer critical incident stress debriefings for affected employees is a key role for the occupational health professional. Familiarity with these concepts and the ability to identify a critical incident enhances value to the business by mitigating the stress and impact to the workplace. Critical Incident Stress Management Systems have the potential for decreasing stress and restoring employees to normal life function--a win/win situation for both the employees and the organization.

  12. Information Security Incident Management

    Directory of Open Access Journals (Sweden)

    D. I. Persanov

    2010-03-01

    Full Text Available The present report highlights the points of information security incident management in an enterprise. Some aspects of the incident and event classification are given. The author presents his view of the process scheme over the monitoring and processing information security events. Also, the report determines a few critical points of the listed process and gives the practical recommendations over its development and optimization.

  13. Emergency imaging after a mass casualty incident: role of the radiology department during training for and activation of a disaster management plan

    NARCIS (Netherlands)

    Berger, Ferco H.; Körner, Markus; Bernstein, Mark P.; Sodickson, Aaron D.; Beenen, Ludo F.; McLaughlin, Patrick D.; Kool, Digna R.; Bilow, Ronald M.

    2016-01-01

    In the setting of mass casualty incidents (MCIs), hospitals need to divert from normal routine to delivering the best possible care to the largest number of victims. This should be accomplished by activating an established hospital disaster management plan (DMP) known to all staff through prior

  14. Improving freight crash incident management.

    Science.gov (United States)

    2015-06-01

    The objective of this study was to determine the most effective way to mitigate the effect of freight : crash incidents on Louisiana freeways. Candidate incident management strategies were reviewed from : practice in other states and from those publi...

  15. Hospital planning for weapons of mass destruction incidents

    Directory of Open Access Journals (Sweden)

    Perry Ronald

    2006-01-01

    Full Text Available As terrorists attacks increase in frequency, hospital disaster plans need to be scrutinized to ensure that they take into account issues unique to weapons of mass destruction. This paper reports a review of the literature addressing hospital experiences with such incidents and the planning lessons thus learned. Construction of hospital disaster plans is examined as an ongoing process guided by the disaster planning committee. Hospitals are conceived as one of the components of a larger community disaster planning efforts, with specific attention devoted to defining important linkages among response organizations. This includes the public health authorities, political authorities, prehospital care agencies, and emergency management agencies. A review is completed of six special elements of weapons of mass destruction incidents that should be addressed in hospital disaster plans: incident command, hospital security, patient surge, decontamination, mental health consequences, and communications. The paper closes with a discussion of the importance of training and exercises in maintaining and improving the disaster plan.

  16. Energy planning and management plan

    International Nuclear Information System (INIS)

    1996-01-01

    This paper contains printed copies of 60FR 53181, October 12, 1995 and 60 FR 54151. This is a record of decision concerning the Western Area Power Administration's final draft and environmental impact statement, and Energy Planning and Management Program

  17. Information sharing for traffic incident management.

    Science.gov (United States)

    2009-01-01

    Traffic incident management focuses on developing procedures, implementing policies, and deploying technologies to more quickly identify incidents, improve response times, and more effectively and efficiently manage the incident scene. Because so man...

  18. Agency procedures for the NRC incident response plan. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    The NRC Incident Response Plan, NUREG-0728/MC 0502 describes the functions of the NRC during an incident and the kinds of actions that comprise an NRC response. The NRC response plan will be activated in accordance with threshold criteria described in the plan for incidents occurring at nuclear reactors and fuel facilities involving materials licensees; during transportation of licensed material, and for threats against facilities or licensed material. In contrast to the general overview provided by the Plan, the purpose of these agency procedures is to delineate the manner in which each planned response function is performed; the criteria for making those response decisions which can be preplanned; and the information and other resources needed during a response. An inexperienced but qualified person should be able to perform functions assigned by the Plan and make necessary decisions, given the specified information, by becoming familiar with these procedures. This rule of thumb has been used to determine the amount of detail in which the agency procedures are described. These procedures form a foundation for the training of response personnel both in their normal working environment and during planned emergency exercises. These procedures also form a ready reference or reminder checklist for technical team members and managers during a response

  19. Wildland Fire Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Schwager, K. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2017-09-30

    The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

  20. Fund management plan

    International Nuclear Information System (INIS)

    1984-08-01

    This revision of the Fund Management Plan updates the original plan published in May 1983. It is derived from and supplements the Mission Plan of the Office of Civilian Radioactive Waste Management. A major purpose in preparing this Plan is to inform the public about management of the Nuclear Waste Fund and the Interim Storage Fund. The purpose of the Interim Storage Fund is to finance the provision of the Federal interim storage capacity of up to 1900 metric tons of spent nuclear fuel. The Nuclear Waste Fund is a separate account for all revenues and expenditures related to the geological disposal and monitored retrieval storage of civilian radioactive waste

  1. US ITER Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    This US ITER Management Plan is the plan for conducting the Engineering Design Activities within the US. The plan applies to all design, analyses, and associated physics and technology research and development (R ampersand D) required to support the program. The plan defines the management considerations associated with these activities. The plan also defines the management controls that the project participants will follow to establish, implement, monitor, and report these activities. The activities are to be conducted by the project in accordance with this plan. The plan will be updated to reflect the then-current management approach required to meet the project objectives. The plan will be reviewed at least annually for possible revision. Section 2 presents the ITER objectives, a brief description of the ITER concept as developed during the Conceptual Design Activities, and comments on the Engineering Design Activities. Section 3 discusses the planned international organization for the Engineering Design Activities, from which the tasks will flow to the US Home Team. Section 4 describes the US ITER management organization and responsibilities during the Engineering Design Activities. Section 5 describes the project management and control to be used to perform the assigned tasks during the Engineering Design Activities. Section 6 presents the references. Several appendices are provided that contain detailed information related to the front material

  2. Natural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Green, T. [Brookhaven National Laboratory (BNL), Upton, NY (United States); Schwager, K. [Brookhaven National Laboratory (BNL), Upton, NY (United States)

    2016-10-01

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265-acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 15 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan works toward sound ecological management that not only benefits BNL’s ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text.

  3. Information Security Incident Management Practical Aspects

    Directory of Open Access Journals (Sweden)

    A. B. Kostina

    2010-03-01

    Full Text Available The information security incident management process model (ISIMP is developed; the role of this process in the information security management system is established. Input and output data of the process are determined. Key practical aspects of incident management are determined.

  4. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  5. Speed management program plan.

    Science.gov (United States)

    2014-05-01

    Changing public attitudes regarding speeding and speed management will require a comprehensive and concerted effort, involving a wide variety of strategies. This plan identifies six primary focus areas: : A. Data and Data-Driven Approaches, : B. Rese...

  6. Risk Management Plan Rule

    Science.gov (United States)

    RMP implements Section 112(r) of the 1990 Clean Air Act amendments, and requires facilities that use extremely hazardous substances to develop a Risk Management Plan and revise/resubmit every five years. Find guidance, factsheets, training, and assistance.

  7. Wilderness fire management planning guide

    Science.gov (United States)

    William C. Fischer

    1984-01-01

    Outlines a procedure for fire management planning for parks; wilderness areas; and other wild, natural, or essentially undeveloped areas. Discusses background and philosophy of wilderness fire management, planning concepts, planning elements, and planning methods.

  8. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Vogelsang, Stefan; Freudenberg, Peggy

    2015-01-01

    This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data.......This document describes the Data Management Plan (DMP) (first version), relating to RIBuild WP8, deliverable D8.1. The DMP include description of data sets, standards and metadata, data sharing and archiving and preservation of data....

  9. Bronchoaspiration: incidence, consequences and management.

    Science.gov (United States)

    Beck-Schimmer, Beatrice; Bonvini, John M

    2011-02-01

    Aspiration is defined as the inhalation of oropharyngeal or gastric contents into the lower respiratory tract. Upon injury, epithelial cells and alveolar macrophages secrete chemical mediators, attracting and activating neutrophils, which in turn release proteases and reactive oxygen species, degrading the alveolocapillary unit. Aspiration can lead to a range of diseases such as infectious pneumonia, chemical pneumonitis or respiratory distress syndrome with significant morbidity and mortality. It occurs in approximately 3-10 per 10 000 operations with an increased incidence in obstetric and paediatric anaesthesia. Patients are most at risk during induction of anaesthesia and extubation, in particular in emergency situations. The likelihood of significant aspiration can be reduced by fasting, pharmacological intervention and correct anaesthetic management using a rapid sequence induction. Treatment of acid aspiration is by suctioning after witnessed aspiration; antibiotics are indicated in patients with aspiration pneumonia only. Steroids are not proven to improve outcome or reduce mortality. Patients with acute lung injury requiring mechanical ventilation should be ventilated using lung protective strategies with low tidal volumes and low plateau pressure values, attempting to limit peak lung distension and end-expiratory collapse.

  10. Midwest regional management plan

    International Nuclear Information System (INIS)

    Paton, R.F.

    1986-01-01

    In response to the Low-Level Radioactive Waste Policy Act of 1980, the States of Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio and Wisconsin formed the Midwest Interstate Low-Level Radioactive Waste Compact. One of the top priorities of the Compact Commission is the development of a comprehensive regional waste management plan. The plan consists of five major elements: (1) waste inventory; (2) waste stream projections; (3) analysis of waste management and disposal options; (4) development of a regional waste management system; and (5) selection of a host state(s) for future low-level waste facilities. When completed, the Midwest Management Plan will serve as the framework for future low-level radioactive waste management and disposal decisions

  11. Systems engineering management plans.

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Tamara S.

    2009-10-01

    The Systems Engineering Management Plan (SEMP) is a comprehensive and effective tool used to assist in the management of systems engineering efforts. It is intended to guide the work of all those involved in the project. The SEMP is comprised of three main sections: technical project planning and control, systems engineering process, and engineering specialty integration. The contents of each section must be tailored to the specific effort. A model outline and example SEMP are provided. The target audience is those who are familiar with the systems engineering approach and who have an interest in employing the SEMP as a tool for systems management. The goal of this document is to provide the reader with an appreciation for the use and importance of the SEMP, as well as provide a framework that can be used to create the management plan.

  12. 49 CFR 1542.307 - Incident management.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Incident management. 1542.307 Section 1542.307 Transportation Other Regulations Relating to Transportation (Continued) TRANSPORTATION SECURITY ADMINISTRATION... Incident management. (a) Each airport operator must establish procedures to evaluate bomb threats, threats...

  13. Sewer System Management Plan.

    Energy Technology Data Exchange (ETDEWEB)

    Holland, Robert C. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2017-08-01

    A Sewer System Management Plan (SSMP) is required by the State Water Resources Control Board (SWRCB) Order No. 2006-0003-DWQ Statewide General Waste Discharge Requirements (WDR) for Sanitary Sewer Systems (General Permit). DOE, National Nuclear Security Administration (NNSA), Sandia Field Office has filed a Notice of Intent to be covered under this General Permit. The General Permit requires a proactive approach to reduce the number and frequency of sanitary sewer overflows (SSOs) within the State. SSMPs must include provisions to provide proper and efficient management, operation, and maintenance of sanitary sewer systems and must contain a spill response plan.

  14. Data Management Plan

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Sørensen, Nils Lykke

    2016-01-01

    This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period.......This document describes the Data Management Plan (DMP) (second version), relating to RIBuild WP8, deliverable D8.1. It draws the first lines for how data can be made findable, accessible, interoperable and re-usable after the project period....

  15. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  16. Management self assessment plan

    International Nuclear Information System (INIS)

    Debban, B.L.

    1998-01-01

    Duke Engineering and Services Hanford Inc., Spent Nuclear Fuel Project is responsible for the operation of fuel storage facilities. The SNF project mission includes the safe removal, processing and transportation of Spent Nuclear Fuel from 100 K Area fuel storage basins to a new Storage facility in the Hanford 200 East Area. Its mission is the modification of the 100 K area fuel storage facilities and the construction of two new facilities: the 100 K Area Cold Vacuum Drying Facility, and the 200 East Area Canister Storage Building. The management self assessment plan described in this document is scheduled to begin in April of 1999 and be complete in May of 1999. The management self assessment plan describes line management preparations for declaring that line management is ready to commence operations

  17. Integrating incident investigation into the management system

    International Nuclear Information System (INIS)

    Peterson, E.E.

    1992-01-01

    In the last 10 yr, the size and frequency of incidents affecting the communities and environment surrounding chemical processing facilities has increased. The chemical process industry, which has always concerned itself with the safety of its facilities, has responded by committing to stricter standards of operation and management. A critical element of these management practices is the use of a structured incident investigation program. Many facilities have implemented and disciplined themselves to perform good investigation of incidents. However, most of these facilities maintain incident investigation as part of their safety management programs. This allows the process to be disconnected from the management system that deals with the day-to-day business of the facility. The first step of integration is understanding the objectives and functions of the management system into which the integration is to occur. To begin, a common definition of management is needed. Management, for the purposes of this discussion, is defined as the system of activities used to control, coordinate, and improve the flow of work within a facility or organization. This definition refers to several concepts that need further development in order to understand how incident investigation can be integrated into a management system, including (a) flow of work, (b) control, and (c) improvement. Application can be made to the nuclear industry

  18. Comprehensive Environmental Management Plan

    International Nuclear Information System (INIS)

    Hjeresen, D.L.

    1994-01-01

    The Environmental Management Program at Los Alamos National Laboratory is in the process of initiating and then implementing a Comprehensive Environmental Management Plan (CEMP). There are several environmental impact and compliance drivers for this initiative. The Los Alamos CEMP is intended to be a flexible, long-range process that predicts, minimizes, treats, and disposes of any waste generated in execution of the Los Alamos mission - even if that mission changes. The CEMP is also intended to improve stakeholder and private sector involvement and access to environmental information. The total quality environmental management (TQEM) process will benchmark Los Alamos to private sector and DOE operations, identify opportunities for improvement, prioritize among opportunities, implement projects, measure progress, and spur continuous improvement in Environmental Management operations

  19. Region 7 Quality Management Plan

    Science.gov (United States)

    To document adherence to EPA Order 5360.1 A2, EPA requires each organizational unitto develop a quality management plan per the specifications in EPA Requirements for QualityManagement Plans, EPA QA R-2.

  20. Water resources management plan

    Directory of Open Access Journals (Sweden)

    Glauco Maia

    2011-12-01

    Full Text Available Water resources manageWith the mission of providing reliable data for water supply activities in medium and large firefighting operations, the Firefighting Water Supply Tactical Group (GTSAI represents an important sector of the Rio de Janeiro State Fire Departmentment plan strategic support. Acting proactively, the Tactical Group prepared a Water Resources Management Plan, aiming to set up water resources for each jurisdiction of firefighters in the City of Rio de Janeiro, in order to assist the Fire Department in its missions. This goal was reached, and in association with LAGEOP (Geoprocessing Laboratory, UFRJ, the Tactical Group started using GIS techniques. The plan provides for the register of existing operational structures within each group (troops, vehicles and special equipment, along with knowledge about the nature and operating conditions of fire hydrants, as well as a detailed survey of areas considered to be "critical". The survey helps to support actions related to environmental disasters involved in the aforementioned critical areas (hospital, churches, schools, and chemical industries, among others. The Caju neighborhood, in Rio de Janeiro, was defined as initial application area, and was the first jurisdiction to have the system implemented, followed by Copacabana, Leblon, Lagoa, and Catete districts.

  1. Strategic Planning and Financial Management

    Science.gov (United States)

    Conneely, James F.

    2010-01-01

    Strong financial management is a strategy for strategic planning success in student affairs. It is crucial that student affairs professionals understand the necessity of linking their strategic planning with their financial management processes. An effective strategic planner needs strong financial management skills to implement the plan over…

  2. Systems engineering management plan

    International Nuclear Information System (INIS)

    Conner, C.W.

    1985-10-01

    The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe the systems engineering procedures to be implemented at the Program level and the minimum requirements for systems engineering at the Program-element level. The Program level corresponds to the Director, OCRWM, or to the organizations within OCRWM to which the Director delegates responsibility for the development of the System and for coordinating and integrating the activities at the Program-element level. The Office of Policy and Outreach (OPO) and the Office of Resource Management (ORM) support the Director at the Program level. The Program-element level corresponds to the organizations within OCRWM (i.e., the Office of Geologic Repositories (OGR) and the Office of Storage and Transportation Systems (OSTS)) with overall responsibility for developing the System elements - that is, the mined geologic disposal system (MGDS), monitored retrievable storage (MRS) (if approved by Congress), and the transportation system

  3. Automated Generation of Traffic Incident Response Plan Based on Case-Based Reasoning and Bayesian Theory

    Directory of Open Access Journals (Sweden)

    Yongfeng Ma

    2014-01-01

    Full Text Available Traffic incident response plan, specifying response agencies and their responsibilities, can guide responders to take actions effectively and timely after traffic incidents. With a reasonable and feasible traffic incident response plan, related agencies will save many losses, such as humans and wealth. In this paper, how to generate traffic incident response plan automatically and specially was solved. Firstly, a well-known and approved method, Case-Based Reasoning (CBR, was introduced. Based on CBR, a detailed case representation and R5-cycle of CBR were developed. To enhance the efficiency of case retrieval, which was an important procedure, Bayesian Theory was introduced. To measure the performance of the proposed method, 23 traffic incidents caused by traffic crashes were selected and three indicators, Precision P, Recall R, and Indicator F, were used. Results showed that 20 of 23 cases could be retrieved effectively and accurately. The method is practicable and accurate to generate traffic incident response plans. The method will promote the intelligent generation and management of traffic incident response plans and also make Traffic Incident Management more scientific and effective.

  4. Project Management Plan

    International Nuclear Information System (INIS)

    1988-01-01

    The mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project is explicitly stated and directed in the Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, 42 USC 7901 (hereinafter referred to as the ''Act''). Title I of the Act authorizes the Department of Energy (DOE) to undertake remedial actions at 24 designated inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and other residual radioactive materials derived from the processing sites. The Act, amended in January 1983, by Public Law 97-415, also authorizes DOE to perform remedial actions at vicinity properties in Edgemont, South Dakota. Cleanup of the Edgemont processing site is the responsibility of the Tennessee Valley Authority. This document describes the plan, organization, system, and methodologies used to manage the design, construction, and other activities required to clean up the designated sites and associated vicinity properties in accordance with the Act. The plan describes the objectives of the UMTRA Project, defines participants' roles and responsibilities, outlines the technical approach for accomplishing the objectives, and describes the planning and managerial controls to be used in integrating and performing the Project mission. 21 figs., 21 tabs

  5. Risks management in project planning

    OpenAIRE

    Stankevičiūtė, Roberta

    2017-01-01

    Project management consists of two very important aspects – managing the right project and managing the project right. To know that you are managing the right project you need to ensure that your project is based on an actual requirement and that your project goal is relevant and beneficial. And professional project planning assists in managing project the right way. The project planning process is very time consuming and is one of the most important parts of the project management process. T...

  6. Computer Security Incident Response Planning at Nuclear Facilities

    International Nuclear Information System (INIS)

    2016-06-01

    The purpose of this publication is to assist Member States in developing comprehensive contingency plans for computer security incidents with the potential to impact nuclear security and/or nuclear safety. It provides an outline and recommendations for establishing a computer security incident response capability as part of a computer security programme, and considers the roles and responsibilities of the system owner, operator, competent authority, and national technical authority in responding to a computer security incident with possible nuclear security repercussions

  7. IT Security Vulnerability and Incident Response Management

    NARCIS (Netherlands)

    Hafkamp, W.H.M.; Paulus, S.; Pohlman, N.; Reimer, H.

    2006-01-01

    This paper summarises the results of a Dutch PhD research project on IT security vulnerability and incident response management, which is supervised by the University of Twente in the Netherlands and which is currently in its final stage. Vulnerabilities are ‘failures or weaknesses in computer

  8. Planning and Resource Allocation Management.

    Science.gov (United States)

    Coleman, Jack W.

    1986-01-01

    Modern scientific management techniques provide college administrators with valuable planning and resource allocation insights and enhances the decision process. The planning model should incorporate assessment, strategic planning, dynamic and long-term budgeting, operational planning, and feedback and control for actual operations. (MSE)

  9. Evaluating and improving incident management using historical incident data : case studies at Texas transportation management centers.

    Science.gov (United States)

    2009-08-01

    The companion guidebook (0-5485-P2) developed as part of this study provides the procedures and : methodologies for effective use of historical incident data at Texas Transportation Management Centers : (TMCs). This research report documents the resu...

  10. Project Management Plan Solution Stabilization

    Energy Technology Data Exchange (ETDEWEB)

    SATO, P.K.

    1999-08-31

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process.

  11. Project Management Plan Solution Stabilization

    International Nuclear Information System (INIS)

    SATO, P.K.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the Plutonium Finishing Plant (PFP) Solutions Stabilization subproject. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Integrated Project Management Plan (IPMP) for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617. This project plan is the top-level definitive project management document for the PFP Solution Stabilization subproject. It specifies the technical, schedule, requirements and the cost baselines to manage the execution of the Solution Stabilization subproject. Any deviations to the document must be authorized through the appropriate change control process

  12. Key Planning Factors for Recovery from a Radiological Terrorism Incident

    Science.gov (United States)

    2012-09-01

    is the radioactive source material specified in National Planning Scenario #11. Cs-137 has also been involved in several real-world accidents ...including a significant incident in 1987, where scavengers dismantled a metal canister from a radiotherapy machine at an abandoned cancer clinic in...report describing the Cs-137 accident in Goiania, Brazil. Lawrence Livermore National Laboratory September 2012Key Planning Factors for Radiological

  13. Waste Management Program management plan. Revision 1

    International Nuclear Information System (INIS)

    1997-02-01

    As the prime contractor to the Department of Energy Idaho Operations Office (DOE-ID), Lockheed Martin Idaho Technologies Company (LMITCO) provides comprehensive waste management services to all contractors at the Idaho National Engineering and Environmental Laboratory (INEEL) through the Waste Management (WM) Program. This Program Management Plan (PMP) provides an overview of the Waste Management Program objectives, organization and management practices, and scope of work. This document will be reviewed at least annually and updated as needed to address revisions to the Waste Management's objectives, organization and management practices, and scope of work. Waste Management Program is managed by LMITCO Waste Operations Directorate. The Waste Management Program manages transuranic, low-level, mixed low-level, hazardous, special-case, and industrial wastes generated at or transported to the INEEL

  14. Developing formal asset management plans

    Science.gov (United States)

    2014-06-01

    This report highlights key recommendations and best practices identified at the peer exchange on Transportation Asset Management Plans (TAMP), held on February 5 and 6, 2014, in Columbia, South Carolina. This event was sponsored by the Transportation...

  15. The World Trade Center attack. Helping the helpers: the role of critical incident stress management.

    Science.gov (United States)

    Hammond, J; Brooks, J

    2001-12-01

    Healthcare and prehospital workers involved in disaster response are susceptible to a variety of stress-related psychological and physical sequelae. Critical incident stress management, of which critical incident stress debriefing is a component, can mitigate the response to these stressors. Critical incident stress debriefing is a peer-driven, therapist-guided, structured, group intervention designed to accelerate the recovery of personnel. The attack on the World Trade Center, and the impact it may have on rescue, prehospital, and healthcare workers, should urge us to incorporate critical incident stress management into disaster management plans.

  16. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    1993-01-01

    Lawrence Berkeley Laboratory's Environment Department addresses its responsibilities through activities in a variety of areas. The need for a comprehensive management control system for these activities has been identified by the Department of Energy (DOE). The WM QA (Waste Management Quality Assurance) Plan is an integral part of a management system that provides controls necessary to ensure that the department's activities are planned, performed, documented, and verified. This WM QA Plan defines the requirements of the WM QA program. These requirements are derived from DOE Order 5700.6C, Quality Assurance, the LBL Operating and Assurance Program Plan (OAP, LBL PUB-3111), and other environmental compliance documents applicable to WM activities. The requirements presented herein, as well as the procedures and methodologies that direct the implementation of these requirements, will undergo review and revisions as necessary. The provisions of this QA Plan and its implementing documents apply to quality-affecting activities performed by and for WM. It is also applicable to WM contractors, vendors, and other LBL organizations associated with WM activities, except where such contractors, vendors, or organizations are governed by their own WM-approved QA programs. References used in the preparation of this document are (1) ASME NQA-1-1989, (2) ANSI/ASQC E4 (Draft), (3) Waste Management Quality Assurance Implementing Management Plan (LBL PUB-5352, Rev. 1), (4) LBL Operating and Assurance Program Plan (OAP), LBL PUB-3111, 2/3/93. A list of terms and definitions used throughout this document is included as Appendix A

  17. Construction Management: Planning Ahead.

    Science.gov (United States)

    Arsht, Steven

    2003-01-01

    Explains that preconstruction planning is essential when undertaking the challenges of a school building renovation or expansion, focusing on developing a detailed estimate, creating an effective construction strategy, conducting reviews and value-engineering workshops, and realizing savings through effective risk analysis and contingency…

  18. BUDGET PLANNING IN FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Nataliya Melnichuk

    2015-11-01

    Full Text Available The purpose of the paper is to determine the nature, targets, functions, principles and methods of budget planning and development of classifications due to its types. The essence of budget planning presented by various authors, is own interpretation (the process of developing a plan of formation, distribution and redistribution of financial funds according to budget system units during the reporting period based on budgetary purposes and targets defined by socio-economic development strategy is proposed. Methodology. The following methods such as cognition, induction, deduction, analysis and synthesis have been used in the process of survey. Results of the survey proves that budget planning plays an essential role in the financial management. On condition business environment changing even the best management system can become obsolete. The immediate reaction to the new trends in the financial system as a whole, in the industry is possible with budget planning as well. It also allows to make appropriate adjustments to the plans. Adjustment of long-term, medium-term and short-term plans makes it possible, without changing goals, to change ways of their achievement and thus to raise the level of efficiency of budget funds formation and use. It is necessary to revise the whole system plans, including their mission and goals in the case of global changes in the external and internal environment. Practical implications. The proposed approach to the classification of budget planning types allows to cope with the shortcomings of modern planning in the public sector (the development of the targets according to the state budget expenditures in Ukraine remains a formality and it rarely complies with realities. Value/originality is specified in the proposed interpretation which differs from existing ones that provides clarification of budget planning purpose in financial management; classification of budget planning principles, which differs from previous

  19. Computer incident response and forensics team management conducting a successful incident response

    CERN Document Server

    Johnson, Leighton

    2013-01-01

    Computer Incident Response and Forensics Team Management provides security professionals with a complete handbook of computer incident response from the perspective of forensics team management. This unique approach teaches readers the concepts and principles they need to conduct a successful incident response investigation, ensuring that proven policies and procedures are established and followed by all team members. Leighton R. Johnson III describes the processes within an incident response event and shows the crucial importance of skillful forensics team management, including when and where the transition to forensics investigation should occur during an incident response event. The book also provides discussions of key incident response components. Provides readers with a complete handbook on computer incident response from the perspective of forensics team management Identify the key steps to completing a successful computer incident response investigation Defines the qualities necessary to become a succ...

  20. Groundwater protection management program plan

    International Nuclear Information System (INIS)

    1992-06-01

    US Department of Energy (DOE) Order 5400.1 requires the establishment of a groundwater protection management program to ensure compliance with DOE requirements and applicable Federal, state, and local laws and regulations. The Uranium Mill Tailings Remedial Action (UMTRA) Project Office has prepared a ''Groundwater Protection Management Program Plan'' (groundwater protection plan) of sufficient scope and detail to reflect the program's significance and address the seven activities required in DOE Order 5400.1, Chapter 3, for special program planning. The groundwater protection plan highlights the methods designed to preserve, protect, and monitor groundwater resources at UMTRA Project processing and disposal sites. The plan includes an overview of the remedial action status at the 24 designated processing sites and identifies project technical guidance documents and site-specific documents for the UMTRA groundwater protection management program. In addition, the groundwater protection plan addresses the general information required to develop a water resources protection strategy at the permanent disposal sites. Finally, the plan describes ongoing activities that are in various stages of development at UMTRA sites (long-term care at disposal sites and groundwater restoration at processing sites). This plan will be reviewed annually and updated every 3 years in accordance with DOE Order 5400.1

  1. New York integrated incident management system evaluation project final report

    Science.gov (United States)

    2007-03-23

    The Integrated Incident Management System (IIMS) enables incident response personnel to transmit data about an incident to other responders and dispatchers on a real-time basis. When an incident is entered into IIMS, the system uses GPS to identify t...

  2. AVLIS production plant waste management plan

    International Nuclear Information System (INIS)

    1984-01-01

    Following the executive summary, this document contains the following: (1) waste management facilities design objectives; (2) AVLIS production plant wastes; (3) waste management design criteria; (4) waste management plan description; and (5) waste management plan implementation. 17 figures, 18 tables

  3. Underground storage tank management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations.

  4. Underground storage tank management plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Underground Storage Tank (UST) Management Program at the Oak Ridge Y-12 Plant was established to locate UST systems in operation at the facility, to ensure that all operating UST systems are free of leaks, and to establish a program for the removal of unnecessary UST systems and upgrade of UST systems that continue to be needed. The program implements an integrated approach to the management of UST systems, with each system evaluated against the same requirements and regulations. A common approach is employed, in accordance with Tennessee Department of Environment and Conservation (TDEC) regulations and guidance, when corrective action is mandated. This Management Plan outlines the compliance issues that must be addressed by the UST Management Program, reviews the current UST inventory and compliance approach, and presents the status and planned activities associated with each UST system. The UST Management Plan provides guidance for implementing TDEC regulations and guidelines for petroleum UST systems. (There are no underground radioactive waste UST systems located at Y-12.) The plan is divided into four major sections: (1) regulatory requirements, (2) implementation requirements, (3) Y-12 Plant UST Program inventory sites, and (4) UST waste management practices. These sections describe in detail the applicable regulatory drivers, the UST sites addressed under the Management Program, and the procedures and guidance used for compliance with applicable regulations

  5. Business Continuity Management Plan

    Science.gov (United States)

    2014-12-01

    and management style . The four main elements are (Protiviti, 2013): 1. Scoping—This includes IT and/or business functions which may be internally...based on the results of the BIA. In order to develop a solid recovery strategy, the capability leadership team must have a thorough understanding of...action would be needed if capacity at the second site is inadequate. Telecommuting is a strategy employed when staff can work from home through remote

  6. A reservoir management plan

    Energy Technology Data Exchange (ETDEWEB)

    Allis, R.G.

    1989-06-16

    There are numerous documented cases of extraction of fluids from the ground causing surface subsidence. The cases include groundwater, oil and gas, as well as geothermal fluid withdrawal. A recent comprehensive review of all types of man-induced land subsidence was published by the Geological Survey of America. At the early stages of a geothermal power development project it is standard practice in most countries for an environmental impact report to be required. The possibility of geothermal subsidence has to be addressed, and usually it falls on the geophysicists and/or geologists to make some predictions. The advice given is vital for planning the power plant location and the borefield pipe and drain layout. It is not so much the vertical settlement that occurs with subsidence but the accompanying horizontal ground strains that can do the most damage to any man-made structure.

  7. Incident Management in Academic Information System using ITIL Framework

    Science.gov (United States)

    Palilingan, V. R.; Batmetan, J. R.

    2018-02-01

    Incident management is very important in order to ensure the continuity of a system. Information systems require incident management to ensure information systems can provide maximum service according to the service provided. Many of the problems that arise in academic information systems come from incidents that are not properly handled. The objective of this study aims to find the appropriate way of incident management. The incident can be managed so it will not be a big problem. This research uses the ITIL framework to solve incident problems. The technique used in this study is a technique adopted and developed from the service operations section of the ITIL framework. The results of this research found that 84.5% of incidents appearing in academic information systems can be handled quickly and appropriately. 15.5% incidents can be escalated so as to not cause any new problems. The model of incident management applied to make academic information system can run quickly in providing academic service in a good and efficient. The incident management model implemented in this research is able to manage resources appropriately so as to quickly and easily manage incidents.

  8. Solid Waste Management Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Duncan, D.R.

    1990-08-01

    The objective of the Solid Waste Management Program Plan (SWMPP) is to provide a summary level comprehensive approach for the storage, treatment, and disposal of current and future solid waste received at the Hanford Site (from onsite and offsite generators) in a manner compliant with current and evolving regulations and orders (federal, state, and Westinghouse Hanford Company (Westinghouse Hanford)). The Plan also presents activities required for disposal of selected wastes currently in retrievable storage. The SWMPP provides a central focus for the description and control of cost, scope, and schedule of Hanford Site solid waste activities, and provides a vehicle for ready communication of the scope of those activities to onsite and offsite organizations. This Plan represents the most complete description available of Hanford Site Solid Waste Management (SWM) activities and the interfaces between those activities. It will be updated annually to reflect changes in plans due to evolving regulatory requirements and/or the SWM mission. 8 refs., 9 figs., 4 tabs.

  9. Research Data Management - Data Management Plans

    OpenAIRE

    Collins, Anna

    2012-01-01

    This presentation covers what a Data Management Plan (DMP) is, why they are important, how to write a DMP, key considerations for a DMP, understanding your data and documenting it as you go (and backing up), cloud based storage, selecting data to save into the future and where to get help

  10. Global Security Program Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Bretzke, John C. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-03-25

    The Global Security Directorate mission is to protect against proliferant and unconventional nuclear threats –regardless of origin - and emerging new threats. This mission is accomplished as the Los Alamos National Laboratory staff completes projects for our numerous sponsors. The purpose of this Program Management Plan is to establish and clearly describe the GS program management requirements including instructions that are essential for the successful management of projects in accordance with our sponsor requirements. The detailed information provided in this document applies to all LANL staff and their subcontractors that are performing GS portfolio work. GS management is committed to a culture that ensures effective planning, execution, and achievement of measurable results in accordance with the GS mission. Outcomes of such a culture result in better communication, delegated authority, accountability, and increased emphasis on safely and securely achieving GS objectives.

  11. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  12. [Second victim : Critical incident stress management in clinical medicine].

    Science.gov (United States)

    Schiechtl, B; Hunger, M S; Schwappach, D L; Schmidt, C E; Padosch, S A

    2013-09-01

    Critical incidents in clinical medicine can have far-reaching consequences on patient health. In cases of severe medical errors they can seriously harm the patient or even lead to death. The involvement in such an event can result in a stress reaction, a so-called acute posttraumatic stress disorder in the healthcare provider, the so-called second victim of an adverse event. Psychological distress may not only have a long lasting impact on quality of life of the physician or caregiver involved but it may also affect the ability to provide safe patient care in the aftermath of adverse events. A literature review was performed to obtain information on care giver responses to medical errors and to determine possible supportive strategies to mitigate negative consequences of an adverse event on the second victim. An internet search and a search in Medline/Pubmed for scientific studies were conducted using the key words "second victim, "medical error", "critical incident stress management" (CISM) and "critical incident stress reporting system" (CIRS). Sources from academic medical societies and public institutions which offer crisis management programs where analyzed. The data were sorted by main categories and relevance for hospitals. Analysis was carried out using descriptive measures. In disaster medicine and aviation navigation services the implementation of a CISM program is an efficient intervention to help staff to recover after a traumatic event and to return to normal functioning and behavior. Several other concepts for a clinical crisis management plan were identified. The integration of CISM and CISM-related programs in a clinical setting may provide efficient support in an acute crisis and may help the caregiver to deal effectively with future error events and employee safety.

  13. Performance Demonstration Program Management Plan

    International Nuclear Information System (INIS)

    2005-01-01

    To demonstrate compliance with the Waste Isolation Pilot Plant (WIPP) waste characterization program, each testing and analytical facility performing waste characterization activities participates in the Performance Demonstration Program (PDP). The PDP serves as a quality control check against expected results and provides information about the quality of data generated in the characterization of waste destined for WIPP. Single blind audit samples are prepared and distributed by an independent organization to each of the facilities participating in the PDP. There are three elements within the PDP: analysis of simulated headspace gases, analysis of solids for Resource Conservation and Recovery Act (RCRA) constituents, and analysis for transuranic (TRU) radionuclides using nondestructive assay (NDA) techniques. Because the analysis for TRU radionuclides using NDA techniques involves both the counting of drums and standard waste boxes, four PDP plans are required to describe the activities of the three PDP elements. In accordance with these PDP plans, the reviewing and approving authority for PDP results and for the overall program is the CBFO PDP Appointee. The CBFO PDP Appointee is responsible for ensuring the implementation of each of these plans by concurring with the designation of the Program Coordinator and by providing technical oversight and coordination for the program. The Program Coordinator will designate the PDP Manager, who will coordinate the three elements of the PDP. The purpose of this management plan is to identify how the requirements applicable to the PDP are implemented during the management and coordination of PDP activities. The other participants in the program (organizations that perform site implementation and activities under CBFO contracts or interoffice work orders) are not covered under this management plan. Those activities are governed by the organization's quality assurance (QA) program and procedures or as otherwise directed by CBFO.

  14. Strategic Management or Strategic Planning for Defense?

    Science.gov (United States)

    1989-02-01

    strategic management within DoD. Authors offer a series of suggested reforms to enhance mono-level planning and management within DoD, primarily by closer ties with industry planning groups, education, organizational structure, management information systems, and better integration. Additional sponsors are: OSD competitive Strategies Office, OSD Strategic Planning Branch, and the National Security Council Staff. Strategic management , Military organization, Education, Long range planning, Competitive strategies, DoD, Strategic planning, Curriculum

  15. Los Alamos National Laboratory emergency management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Ramsey, G.F.

    1998-07-15

    The Laboratory has developed this Emergency Management Plan (EMP) to assist in emergency planning, preparedness, and response to anticipated and actual emergencies. The Plan establishes guidance for ensuring safe Laboratory operation, protection of the environment, and safeguarding Department of Energy (DOE) property. Detailed information and specific instructions required by emergency response personnel to implement the EMP are contained in the Emergency Management Plan Implementing Procedure (EMPIP) document, which consists of individual EMPIPs. The EMP and EMPIPs may be used to assist in resolving emergencies including but not limited to fires, high-energy accidents, hazardous material releases (radioactive and nonradioactive), security incidents, transportation accidents, electrical accidents, and natural disasters.

  16. Planning and Managing Drupal Projects

    CERN Document Server

    Nordin, Dani

    2011-01-01

    If you're a solo website designer or part of a small team itching to build interesting projects with Drupal, this concise guide will get you started. Drupal's learning curve has thrown off many experienced designers, particularly the way it handles design challenges. This book shows you the lifecycle of a typical Drupal project, with emphasis on the early stages of site planning. Learn how to efficiently estimate and set up your own project, so you can focus on ways to make your vision a reality, rather than let project management details constantly distract you. Plan and estimate your projec

  17. Melanoma in Organ Transplant Recipients: Incidence, Outcomes and Management Considerations

    Directory of Open Access Journals (Sweden)

    Faisal R. Ali

    2012-01-01

    Full Text Available The incidence of melanoma continues to increase year on year. With better surgical techniques and medical management, greater numbers of organ transplants are being performed annually with much longer graft survival. The authors review our current understanding of the incidence of melanoma amongst organ transplant recipients, outcomes compared to the immunocompetent population, and management strategies in this burgeoning group.

  18. Melanoma in Organ Transplant Recipients: Incidence, Outcomes and Management Considerations

    International Nuclear Information System (INIS)

    Ali, F. R.; Lear, J. T.

    2012-01-01

    The incidence of melanoma continues to increase year on year. With better surgical techniques and medical management, greater numbers of organ transplants are being performed annually with much longer graft survival. The authors review our current understanding of the incidence of melanoma amongst organ transplant recipients, outcomes compared to the immunocompetent population, and management strategies in this burgeoning group

  19. Pro-active Management of Traffic Incidents Using Novel Technologies

    NARCIS (Netherlands)

    Nitsche, P.; Olstam, J.; Taylor, N.; Reinthaler, M.; Ponweiser, W.; Bernhardsson, V.; Mocanu, I.; Uittenbogaard, J.; Dam, E. van

    2016-01-01

    This paper presents the results of the assessment phase of the project PRIMA (Pro-Active Incident Management), where the benefits, costs and risks of novel traffic incident management techniques are investigated. The project targets the enhancement of current state-of-the-art measures for handling

  20. Current approaches to managing aggressive incidents among in ...

    African Journals Online (AJOL)

    Background: Aggressive behavior and incidents in psychiatric wards are commonplace and management approaches should be evidencebased. This audit aims to review the management of violent incidents and aggressive behaviour in the acute wards of the Federal Neuropsychiatric Hospital Calabar against the NICE ...

  1. Forest Resource Management Plans: A Sustainability Approach

    Science.gov (United States)

    Pile, Lauren S.; Watts, Christine M.; Straka, Thomas J.

    2012-01-01

    Forest Resource Management Plans is the capstone course in many forestry and natural resource management curricula. The management plans are developed by senior forestry students. Early management plans courses were commonly technical exercises, often performed on contrived forest "tracts" on university-owned or other public lands, with a goal of…

  2. Environmental Restoration Program Management Control Plan

    International Nuclear Information System (INIS)

    1991-09-01

    This Management Control Plan has been prepared to define the Energy Systems approach to managing its participation in the US DOE's Environmental Restoration (ER) Program in a manner consistent with DOE/ORO 931: Management Plan for the DOE Field Office, Oak Ridge, Decontamination and Decommissioning Program; and the Energy Systems Environmental Restoration Contract Management Plan (CMP). This plan discusses the systems, procedures, methodology, and controls to be used by the program management team to attain these objectives

  3. Development of the decision make supporting system on incident management

    International Nuclear Information System (INIS)

    Kasamatsu, Mizuki; Hanada, Satoshi; Noda, Eisuke

    2017-01-01

    Decision Make Supporting System is designed to support appropriate decision made by top management in the nuclear severe conditions. With crisis response in nuclear power plant (NPP), information entanglement between sites and control centers during intense situations interfere with prompt and accurate decision making. This research started with that kind of background. In order to solve the issue of the information entanglement, Mitsubishi Heavy Industries, Inc. (MHI) carried out the development of the Decision Make Supporting System and the system applies the technology combining the human factors engineering (HFE) and information and communication technology (ICT). During the crisis response, various commands, reactions and communications in a human system need to be managed. Therefore, the combined HFE method including detailed task analysis, user experience (UX), graphic user interface (GUI) and related human-system interface (HSI) design method is applied to the design of the system. These design results systematize the functions that prevent interference with decision-making in the headquarters for incident management. This new solution as a system enhances the safety improvement of the NPP and contributes to develop the skills and abilities of the resources in the NPP. The system has three key features for supporting emergency situations: 'understanding the situation', 'planning the next action', and 'managing resources'. The system helps commanders and responders to grasp the whole situation and allows them to share information in real time to get a whole picture, and the system accumulates the data of the past events in the chronological order to understand correctly how they happened and plan the next action by using a knowledge database that MHI has been developed. If the unexpected event happens which are not in the incident scenario, the system provides support to formulate alternative strategies and measures. With this

  4. Waste Management Quality Assurance Plan

    International Nuclear Information System (INIS)

    2006-01-01

    The WMG QAP is an integral part of a management system designed to ensure that WMG activities are planned, performed, documented, and verified in a manner that assures a quality product. A quality product is one that meets all waste acceptance criteria, conforms to all permit and regulatory requirements, and is accepted at the offsite treatment, storage, and disposal facility. In addition to internal processes, this QA Plan identifies WMG processes providing oversight and assurance to line management that waste is managed according to all federal, state, and local requirements for waste generator areas. A variety of quality assurance activities are integral to managing waste. These QA functions have been identified in the relevant procedures and in subsequent sections of this plan. The WMG QAP defines the requirements of the WMG quality assurance program. These requirements are derived from Department of Energy (DOE) Order 414.1C, Quality Assurance, Contractor Requirements Document, the LBNL Operating and Assurance Program Plan (OAP), and other applicable environmental compliance documents. The QAP and all associated WMG policies and procedures are periodically reviewed and revised, as necessary, to implement corrective actions, and to reflect changes that have occurred in regulations, requirements, or practices as a result of feedback on work performed or lessons learned from other organizations. The provisions of this QAP and its implementing documents apply to quality-affecting activities performed by the WMG; WMG personnel, contractors, and vendors; and personnel from other associated LBNL organizations, except where such contractors, vendors, or organizations are governed by their own WMG-approved QA programs

  5. Air quality management planning (AQMP

    Directory of Open Access Journals (Sweden)

    Sivertsen Bjarne

    2012-01-01

    Full Text Available In most urban areas of the world, particulate matter (PM levels pose severe problems, addressed in several policy areas (air quality, climate change, and human health. PM presents multiple challenges due to the multitude of its sources, spanning many sectors of economic activity as well as nature, and due to the complexity of atmospheric processes involved in its transport and secondary formation. For the authorities, the goal is to assure minimal impacts of atmospheric PM levels, in practice represented by compliance with existing regulations and standards. This may be achieved through an air quality management plan (AQMP. In Northern America and in parts of Europe, comprehensive research programs have guided development of AQMP over the last forty years. This cumulated experience can be utilized by others who face the same problems, but have yet to develop their own substantial research base. The main purpose of the AQMP development process is to establish an effective and sound basis for planning and management of air quality in a selected area. This type of planning will ensure that significant sources of impacts are identified and controlled in a most cost-effective manner. The choice of tools, methods and input information is often dictated by their availability, and should be evaluated against current best practices. Important elements of the AQMP are the identification of sources and development of a complete emission inventory, the development and operation of an air quality monitoring programme, and the development and application of atmospheric dispersion models. Major task is to collect the necessary input data. The development of the AQMP will take into account: - Air Quality Management System (AQMS requirements; - Operational and functional structure requirements; - Source identification through emission inventories; - Source reduction alternatives, which may be implemented; - Mechanisms for facilitating interdepartmental

  6. A New Model For Understanding Incident Management

    Science.gov (United States)

    2016-12-01

    emergency management agencies and practitioners. Additionally, NEMA seeks to improve and create “ strategic partnerships, innovative programs, and...formulated, and revised administrative responsibilities for emergency management .”33 Several scholarly journals , academic papers, and practitioner articles... management as a profession, David T. Crews states, “In their primary and ‘ strategic ’ roles, emergency managers must analyze the threat to economic

  7. Marine Spatial Planning: Norway´s management plans

    OpenAIRE

    Hoel, Alf Håkon; Olsen, Erik

    2010-01-01

    Since the adoption of a government white paper on ocean governance in 2001, Norway has worked on the development and implementation of marine spatial planning in the format of regional management plans. Management plans for the Barents Sea and the oceans off northern Norway and the Norwegian Sea were adopted in 2006 and 2009, respect...

  8. SDDOT transportation systems management & operations program plan.

    Science.gov (United States)

    2016-06-01

    The objective of this project is the development of a comprehensive Transportation Systems Management and : Operations (TSM&O) Program Plan for the South Dakota Department of Transportation. This plan guides : business planning and strategic decision...

  9. Necedah National Wildlife Refuge furbearer management plan

    Data.gov (United States)

    Department of the Interior — This Furbearer Management Plan for the Necedah National Wildlife Refuge is one of several step-down plans identified in the Refuge’s Comprehensive Conservation Plan...

  10. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    .... As a result, DoD has prepared the Financial Management Improvement Plan (the Plan), which is a strategic framework that includes the Departments financial management concept of operations for the future...

  11. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden about the plans for the final disposal of the radioactive waste products of the nuclear power. Part 1 describes the general background, the plans for research and development, including the necessary facilities. The time schedule and the calculated costs of the operations are presented. (G.B.)

  12. Planning and Nuclear Knowledge Management

    International Nuclear Information System (INIS)

    Grance Torales, V.L.; Lira, L.

    2016-01-01

    Full text: The present case aims to share the experience of the Intellectual Capital Section (ICS), part of Planning, Coordination and Control Department of the Argentine Atomic Energy Commission (CNEA) in its search for a sustainable knowledge management. Among the strategic objectives included in CNEA’s Strategic Plan (SP), is the development, preservation and transference of knowledge and experience. Under this framework, the role initially assumed by the ICS, consisted on the observation and diagnosis of the situation of the Institutional Human Capital (HC), through the study of the main characteristics of the staff of CNEA. The second stage of SP (2015–2025), which consisted of updating the HC data, the incorporation of the concept of “knowledge management” was approved by the authorities of the Institution. Based on this background, in 2016 the objectives of the ICS are aimed at organizing and coordinating a network of knowledge management that involves the entire organization. This new phase implies, among other things, the proposal of a knowledge management policy, interaction with other sectors of CNEA for implementation, analysis of the tools to be used, in order to determine a way and work style that suits the culture and structure of the organization. (author

  13. Liquidity management through financial planning

    Directory of Open Access Journals (Sweden)

    Kameníková Katarína

    2001-12-01

    Full Text Available One of the basic goals of financial management is to provide financial property and capital for running of the firm, as well as for its development, that means provide optimal firm´s liquidity.To improve liquidity is possible provide through various ways. In present time there is increasing importance of financial planning., where planning of liquidity presents one of its integral part. Therefore I deal in presented paper with possible liquidity improvement through calculation of financial planning in chosen slovac magnesite firm, exploitating and elaborating magnesite raw material.For creating of financial plann of liquidity I chosed to use one of the practical methods - method of financial indexes. Such method presents process of planning optimal liquidity with providing of required rentability. Such plann must provide balance between income and outcome, as well as secure achievment of expected profit.I used tools of financial planning for calculation of possible liquidity improvement in mentioned firm, where present financial situation is characterised by law liquidity, but high rentability. Such position presents transitive crisis situation, therefore firm must create new financial property or decrease liabilities, in order to overcome negative state of liquidity.Performed calculation showed, that change in balance sheet due to the growth of financial property will improve liquidity, rentability will be maintained, therefore firm will be able to transit from crisis situation.Providing of liquidity will present one of possible way how to care for financial health of firm. But such process is not simple, it must be done with connection to the changes of internal and external conditions of the firm.

  14. Sports Related Injuries: Incidence, Management and Prevention

    OpenAIRE

    Stanger, Michael A.

    1982-01-01

    The incidence of injury related to various sports is reviewed according to sport, area of injury, number of participants and hours per week spent at the sport. Organized sports accounted for fewer injuries than unsupervised recreational activities like tree climbing, skateboarding and running. The knee is the most commonly injured site. Sensitivity to patients' commitment to their sport is necessary: sometimes instead of rest, they can substitute a less hazardous form of exercise. Principles ...

  15. Safer travel, improved economic productivity : incident management systems

    Science.gov (United States)

    1999-01-01

    This brochure gives an overview of how incident management technologies can be used to reduce incident-related congestion and increase road safety. It focuses on the need for interagency cooperation and the benefits that can be derived from the coope...

  16. Wildfire incidence and management in the forest transition zone of ...

    African Journals Online (AJOL)

    A survey was conducted in eight communities in the forest transition zone to assess the perceptions of farmers on farming-related wildfire incidences, specific activities in farming associated with incidence of wildfires and coping measures being used by farmers to manage wildfires. Farmers in the studied settlements hold ...

  17. Defining Incident Management Processes for CSIRTs: A Work in Progress

    National Research Council Canada - National Science Library

    Alberts, Chris; Dorofee, Audrey; Killcrece, Georgia; Ruefle, Robin; Zajicek, Mark

    2004-01-01

    .... Workflow diagrams and descriptions are provided for each of these processes. One advantage of the model is that it enables examination of incident management processes that cross organizational boundaries, both internally and externally...

  18. Air quality evaluation of Rhode Island's incident management program

    Science.gov (United States)

    1997-09-01

    The objective of this preliminary air quality analysis was to assess the potential air quality benefits associated with the implementation of Providence's Metropolitan portion of Rhode Island's Incident Management Program. Specifically, the air quali...

  19. Overview of the Hanford risk management plan

    Energy Technology Data Exchange (ETDEWEB)

    Halverson, T.G.

    1998-03-26

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context.

  20. Assessment of LANL waste management site plan

    International Nuclear Information System (INIS)

    Black, R.L.; Davis, K.D.; Hoevemeyer, S.S.; Jennrich, E.A.; Lund, D.M.

    1991-04-01

    The objective of this report is to present findings from evaluating the Los Alamos National Laboratory (LANL) Waste Management Plan to determine if it meets applicable DOE requirements. DOE Order 5820.2A, Radioactive Waste Management, sets forth requirements and guidelines for the establishment of a Waste Management Plan. The primary purpose of a Waste Management Plan is to describe how waste operations are conducted, what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming year

  1. Overview of the Hanford risk management plan

    International Nuclear Information System (INIS)

    Halverson, T.G.

    1998-01-01

    The Project Hanford Management Contract called for the enhancement of site-wide decision processes, and development of a Hanford Risk Management Plan to adopt or develop a risk management system for the Hanford Site. This Plan provides a consistent foundation for Site issues and addresses site-wide management of risks of all types. It supports the Department of Energy planning and sitewide decision making policy. Added to this requirement is a risk performance report to characterize the risk management accomplishments. This paper presents the development of risk management within the context of work planning and performance. Also discussed are four risk elements which add value to the context

  2. Tank waste remediation system risk management plan

    International Nuclear Information System (INIS)

    Zimmerman, B.D.

    1998-01-01

    The purpose of the Tank Waste Remediation System (TWRS) Risk Management Plan is to describe a consistent approach to risk management such that TWRS Project risks are identified and managed to achieve TWRS Project success. The Risk Management Plan implements the requirements of the Tank Waste Remediation System Systems Engineering Management Plan in the area of risk management. Figure ES-1 shows the relationship of the TWRS Risk Management Plan to other major TWRS Project documents. As the figure indicates, the Risk Management Plan is a tool used to develop and control TWRS Project work. It provides guidance on how TWRS Project risks will be assessed, analyzed, and handled, and it specifies format and content for the risk management lists, which are a primary product of the risk management process. In many instances, the Risk Management Plan references the TWRS Risk Management Procedure, which provides more detailed discussion of many risk management activities. The TWRS Risk Management Plan describes an ongoing program within the TWRS Project. The Risk Management Plan also provides guidance in support of the TWRS Readiness To-Proceed (RTP) assessment package

  3. Radioactive waste management plan. Plan 82

    International Nuclear Information System (INIS)

    1982-06-01

    The report is the first account of the nuclear power utilities of Sweden concerning the plans for the final disposal of the radioactive waste products of the nuclear power. Part 2 describes the waste facilities in details. The layouts and estimated costs are presented. The decomissioning of nuclear power plants and the postponement of it is discussed. (G.B.)

  4. Hoshin Planning Applies Total Quality Management to the Planning Process.

    Science.gov (United States)

    Heverly, Mary Ann; Parker, Jerome S.

    1993-01-01

    Hoshin, or breakthrough, planning is the Total Quality Management method of integrating strategic planning into the daily work of organizational units. Delaware County (Pennsylvania) Community College's adaptation of the process and its use in daily management are described and presented in the form of a flow chart. (MSE)

  5. A Knowledge-based System for Estimating Incident Clearance Duration for Maryland : I-95 a Case Study for the Project of MD-17-SHA/UM/4-19 : “Development of a Traffic Management Decision Support Tool for Freeway Incident Traffic Management (FITM) Plan Deployment”

    Science.gov (United States)

    2017-12-01

    For the incident response operations to be appreciated by the general public, it is essential that responsible highway agencies be capable of providing the estimated clearance duration of a detected incident at the level sufficiently reliable for mot...

  6. The Barrow-in-Furness legionnaires' outbreak: qualitative study of the hospital response and the role of the major incident plan.

    Science.gov (United States)

    Smith, A F; Wild, C; Law, J

    2005-04-01

    To document the organisational response of Furness General Hospital to the large outbreak of legionnaire's disease in April 2002 and assess the contribution made by the hospital's major incident plan. Qualitative analysis of interview transcripts and written comments from some staff involved in the management of the incident. Documentary analysis of major incident plan and other written materials. The incident posed considerable managerial and clinical problems and this paper describes how they were overcome. In particular, strategies for dealing with supply (of staff, beds, and resources) and managing demand (by liaising with primary care and the public) seem to have been successful. Many functions necessary for managing the incident were poorly dealt with in the plan, especially procedures for handling the news media and liaison with agencies outside the hospital. Lack of explicit guidance appeared not to hinder the organisational response. There may have been an unspoken high level decision to allow staff to draw on their skills and experience in improvising a response to the initial challenge and learning adaptively as the incident unfolded. There was also evidence that staff disregarded existing job and role boundaries and focused instead on tasks, working flexibly to ensure that these tasks were completed. Protracted major incidents pose particular management challenges and may benefit from an approach different from that set out in typical major incident plans. Staff must be able to act flexibly and responsively. Some form of checklist or toolkit may be preferable to a detailed plan for some types of incident.

  7. Changing Incidence, Outcome and Management of Myelomeningocele

    Directory of Open Access Journals (Sweden)

    J Gordon Millichap

    2009-07-01

    Full Text Available Pediatric neurosurgeons at Children’s Memorial Hospital, Chicago, review their long-term experience and the evolution of the etiology, diagnosis and management of patients born with myelomeningocele (MM in 1975-1979 and followed for 25 years in a multi-disciplinary spina bifida clinic.

  8. Congenital clinical malaria: Incidence, management and outcome ...

    African Journals Online (AJOL)

    Objective: With paucity of documentation of congenital clinical malaria in the world literature, we therefore aimed to review its rates, presentation, management and out come of this problem in neonates at the Usmanu Danfodiyo University Teaching Hospital, Sokoto. Methodology: This prospective study was carried out in ...

  9. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution

    Directory of Open Access Journals (Sweden)

    GS DeFraia

    2016-04-01

    Full Text Available Background: Psychologically traumatic workplace events (known as critical incidents, which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. Objective: To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Methods: Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. Results: The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Conclusion: Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  10. Workplace Disruption following Psychological Trauma: Influence of Incident Severity Level on Organizations' Post-Incident Response Planning and Execution.

    Science.gov (United States)

    DeFraia, G S

    2016-04-01

    Psychologically traumatic workplace events (known as critical incidents), which occur globally, are increasing in prevalence within the USA. Assisting employers in their response is a growing practice area for occupational medicine, occupational social work, industrial psychology and other occupational health professions. Traumatic workplace events vary greatly in their level of organizational disruption. To explore whether extent of workplace disruption influences organizations' decisions for post-incident response planning and plan execution. Administrative data mining was employed to examine practice data from a workplace trauma response unit in the USA. Bivariate analyses were conducted to test whether scores from an instrument measuring extent of workplace disruption associated with organizational decisions regarding post-incident response. The more severe and disruptive the incident, the more likely organizations planned for and followed through to deliver on-site interventions. Following more severe incidents, organizations were also more likely to deliver group sessions and to complete follow-up consultations to ensure ongoing worker recovery. Increasing occupational health practitioners' knowledge of varying levels of organizational disruption and familiarity with a range of organizational response strategies improves incident assessment, consultation and planning, and ensures interventions delivered are consistent with the level of assistance needed on both worker and organizational levels.

  11. Interim Hanford Waste Management Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The September 1985 Interim Hanford Waste Management Plan (HWMP) is the third revision of this document. In the future, the HWMP will be updated on an annual basis or as major changes in disposal planning at Hanford Site require. The most significant changes in the program since the last release of this document in December 1984 include: (1) Based on studies done in support of the Hanford Defense Waste Environmental Impact Statement (HDW-EIS), the size of the protective barriers covering contaminated soil sites, solid waste burial sites, and single-shell tanks has been increased to provide a barrier that extends 30 m beyond the waste zone. (2) As a result of extensive laboratory development and plant testing, removal of transuranic (TRU) elements from PUREX cladding removal waste (CRW) has been initiated in PUREX. (3) The level of capital support in years beyond those for which specific budget projections have been prepared (i.e., fiscal year 1992 and later) has been increased to maintain Hanford Site capability to support potential future missions, such as the extension of N Reactor/PUREX operations. The costs for disposal of Hanford Site defense wastes are identified in four major areas in the HWMP: waste storage and surveillance, technology development, disposal operations, and capital expenditures

  12. Oak Ridge Reservation Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Turner, J.W. [ed.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year.

  13. Oak Ridge Reservation Waste Management Plan

    International Nuclear Information System (INIS)

    Turner, J.W.

    1995-02-01

    This report presents the waste management plan for the Oak Ridge Reservation facilities. The primary purpose is to convey what facilities are being used to manage wastes, what forces are acting to change current waste management systems, and what plans are in store for the coming fiscal year

  14. Waste management plan for the APT

    International Nuclear Information System (INIS)

    England, J.L.

    1997-01-01

    This revision of the APT Waste Management Plan details the waste management requirements and issues specific to the APT plant for design considerations, construction, and operation. The APT Waste Management Plan is by its nature a living document and will be reviewed at least annually and revised as required

  15. Spent Nuclear Fuel project, project management plan

    International Nuclear Information System (INIS)

    Fuquay, B.J.

    1995-01-01

    The Hanford Spent Nuclear Fuel Project has been established to safely store spent nuclear fuel at the Hanford Site. This Project Management Plan sets forth the management basis for the Spent Nuclear Fuel Project. The plan applies to all fabrication and construction projects, operation of the Spent Nuclear Fuel Project facilities, and necessary engineering and management functions within the scope of the project

  16. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  17. Oak Ridge National Laboratory Waste Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-01

    The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  18. FY 2015 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2014-04-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  19. Medicare Managed Care plan Performance, A Comparison...

    Data.gov (United States)

    U.S. Department of Health & Human Services — The study evaluates the performance of Medicare managed care, Medicare Advantage, Plans in comparison to Medicare fee-for-service Plans in three states with...

  20. FY 2016 - Stockpile Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-03-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  1. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  2. Fires in rooms containing electrical components - incident planning, fire fighting tactics, risks

    International Nuclear Information System (INIS)

    Magnusson, Tommy; Ottosson, Jan; Lindskog, BertiI; Soederquist Bende, Evy; Eriksson, Fredrik; Haffling, Stefan

    2006-12-01

    Officer has according to Swedish law a right and an obligation to make a decision in the case of a fire and rescue operation in a nuclear power plant. Are this responsibility in conflict with the responsibility of the operating managers duties who is responsible for the safe operation of the plant according to the nuclear legislation. The opinion of SKI is that the Nuclear Plant Operator and the Fire Authority must act as a team and that there is no conflict between the laws. In-depth discussions has been started between the involved parties and the mutual consensus is that the question can be removed from the agenda. 2. A nuclear power plant is classified according to the Swedish law as a hazardous plant due to the risk of a nuclear incident followed by leakage of radioactivity. The interpretation of SKI is that a co-ordination between the authorities must take place. The mutual opinion between SKI, Fire Authorities and the operators of the Nuclear Power Plants is that the mutual objective for the areas of fire protection and planning and awareness of undesired events are as follows: The Fire Authorities require that the licensees perform safety analyses and presents the details the outcome of the analyses within for example the area of emergency readiness. The result should also include analyses performed to date. The licensee should detail what measures has been taken, for example for incident plans, emergency readiness, safety equipment etc, necessary with respect to the result of the analyses. The Fire Authority and SSI/SKI consults with each other about the results of the analyses and the measures taken by the operators and evaluate the accuracy of the results and if the measures taken are sufficient. General recommendations in order to choose the appropriate extinguishing media are presented in tables within the report. The recommendations are based on the risk for reactor safety, spread of radioactive contamination and property protection

  3. Regional Management Plan: Summary report

    International Nuclear Information System (INIS)

    Drobny, N.L.

    1986-01-01

    This summary report describes the results of a 16-month project to develop a Regional Management Plan for low-level radioactive waste management in a seven-state area. The seven states are Indiana, Iowa, Michigan, Minnesota, Missouri, Ohio, and Wisconsin. These states have formed the Midwest Interstate Low-Level Radioactive Waste Commission in accord with Congressional requirements established in 1980. What is low-level radioactive waste? Low-level radioactive waste results from the use of radioactive materials in the treatment of disease, the production of consumer goods and industrial products, and from the generation of electricity at nuclear power plants. Low-level wastes, which are a responsibility of the states, are grouped into three classes, A, B, and C; this classification scheme is prescribed by Federal Regulations and represents different degrees of hazard associated with different concentrations of radioactive materials. Class A wastes are the least hazardous. Classes B and C represent higher hazard classes. 14 refs., 13 figs., 9 tabs

  4. Nurse manager succession planning: a concept analysis.

    Science.gov (United States)

    Titzer, Jennifer L; Shirey, Maria R

    2013-01-01

    The current nursing leadership pipeline is inadequate and demands strategic succession planning methods. This article provides concept clarification regarding nurse manager succession planning. Attributes common to succession planning include organizational commitment and resource allocation, proactive and visionary leadership approach, and a mentoring and coaching environment. Strategic planning, current and future leadership analysis, high-potential identification, and leadership development are succession planning antecedents. Consequences of succession planning are improved leadership and organizational culture continuity, and increased leadership bench strength. Health care has failed to strategically plan for future leadership. Developing a strong nursing leadership pipeline requires deliberate and strategic succession planning. © 2013 Wiley Periodicals, Inc.

  5. I-15 integrated corridor management system : project management plan.

    Science.gov (United States)

    2011-06-01

    The Project Management Plan (PMP) assists the San Diego ICM Team by defining a procedural framework for : management and control of the I-15 Integrated Corridor Management Demonstration Project, and development and : deployment of the ICM System. The...

  6. Lucas Heights buffer zone: plan of management

    International Nuclear Information System (INIS)

    1986-01-01

    This plan is being used by the Commission as a guide for its management of the Lucas Heights buffer zone, which is essentially a circular area having a 1-6 km radius around the HIFAR reactor. Aspects covered by this plan include past uses, current use, objectives for buffer zone land management, emergency evacuation, resource conservation, archaeology, fire, access, rehabilitation of disturbed areas, resource management and plan implementation

  7. Total quality management program planning

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, P.T.; Spence, K.

    1994-05-01

    As government funding grows scarce, competition between the national laboratories is increasing dramatically. In this era of tougher competition, there is no for resistance to change. There must instead be a uniform commitment to improving the overall quality of our products (research and technology) and an increased focus on our customers` needs. There has been an ongoing effort to bring the principles of total quality management (TQM) to all Energy Systems employees to help them better prepare for future changes while responding to the pressures on federal budgets. The need exists for instituting a vigorous program of education and training to an understanding of the techniques needed to improve and initiate a change in organizational culture. The TQM facilitator is responsible for educating the work force on the benefits of self-managed work teams, designing a program of instruction for implementation, and thus getting TQM off the ground at the worker and first-line supervisory levels so that the benefits can flow back up. This program plan presents a conceptual model for TQM in the form of a hot air balloon. In this model, there are numerous factors which can individually and collectively impede the progress of TQM within the division and the Laboratory. When these factors are addressed and corrected, the benefits of TQM become more visible. As this occurs, it is hoped that workers and management alike will grasp the ``total quality`` concept as an acceptable agent for change and continual improvement. TQM can then rise to the occasion and take its rightful place as an integral and valid step in the Laboratory`s formula for survival.

  8. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  9. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  10. Solid Waste Management Planning--A Methodology

    Science.gov (United States)

    Theisen, Hilary M.; And Others

    1975-01-01

    This article presents a twofold solid waste management plan consisting of a basic design methodology and a decision-making methodology. The former provides a framework for the developing plan while the latter builds flexibility into the design so that there is a model for use during the planning process. (MA)

  11. The United Kingdom's School Asset Management Plans.

    Science.gov (United States)

    Jones, Alan

    1999-01-01

    Examines the U.K.'s Asset Management Plans (AMPs) designed to help Local Education Authorities (LEAs) identify and address the most important priorities in their school capital programs, and to help in their longer term planning and management of the school estate. Discusses AMP objectives, the stages of developing an AMP, and how the Department…

  12. Managing Dualities in Planned Change Initiatives

    Science.gov (United States)

    Barge, J. Kevin; Lee, Michael; Maddux, Kristy; Nabring, Richard; Townsend, Bryan

    2008-01-01

    Dualities play an important role in creating the conditions for change and managing planned change initiatives. Building on Seo, Putnam, and Bartunek's (2003) work, this study focuses on the dualities associated with managing change processes. A case study of a planned change process called the Circle of Prosperity Initiative, a multi-stakeholder…

  13. Environmental Restoration Information Resource Management Program Plan

    International Nuclear Information System (INIS)

    1994-09-01

    The Environmental Restoration Information Resources Management (ER IRM) Program Plan defines program requirements, organizational structures and responsibilities, and work breakdown structure and to establish an approved baseline against which overall progress of the program as well as the effectiveness of its management will be measured. This plan will guide ER IRM Program execution and define the program's essential elements. This plan will be routinely updated to incorporate key decisions and programmatic changes and will serve as the project baseline document. Environmental Restoration Waste Management Program intersite procedures and work instructions will be developed to facilitate the implementation of this plan

  14. Management of adult spontaneous spondylodiscitis and its rising incidence.

    Science.gov (United States)

    Sur, A; Tsang, K; Brown, M; Tzerakis, N

    2015-09-01

    Spondylodiscitis refers to the infection of the intervertebral disc and osteomyelitis of the adjacent endplates, and it is uncommon in the developed world. Broad consensus indicates its incidence is on the rise. The aim of this retrospective study was twofold. First, we sought to give an up-to-date incidence estimate by comparing case presentation over two time periods (1995-1999 and 2008-2011). Data from the England and Wales census in 2001 and 2011 were used for incidence estimation. The second part of this study aimed to generate management guidance from data from medical and radiographic records of the 2008-2011 patient cohort. The incidence of adult spontaneous spondylodiscitis in the local region between 2008 and 2011 was 3.67/100,000 per year, representing a 150% increase from the incidence in 1995-1999. Our data demonstrate that methicillin sensitive Staphylococcus aureus remains the most common offending pathogen of spontaneous spondylodiscitis. The mean C-reactive protein (CRP) level remained at >30mg/l after a month of starting antibiotic treatment in both medically and surgically managed groups. Evidence suggests that the incidence of spondylodiscitis is on the rise. A review of our case series has demonstrated the effectiveness of intravenous antibiotic therapy. While no official guidance exists for when to switch from intravenous to oral antibiotics, our study shows that CRP at 1 month is >30mg/l and we recommend 6 weeks of intravenous therapy, followed by 6 further weeks of oral therapy.

  15. MANAGING BUILDING CHECKIST PLANS USING BUSCLIS

    Directory of Open Access Journals (Sweden)

    M. Zulfahmi Toh

    2016-02-01

    Full Text Available This paper presents the software namely Building Submission Checklist System (BUSCLIS. It has been developed to manage the submission of building checklist plans process in the construction industry. BUSCLIS helps to simplify the management for acquiescence data of building plan approval for the Local Authority (LA and Country Planning in Malaysia through the web based system. BUSCLIS facilitates user through the computerization forms, which provides fast, efficient and effective service to the engineer, architect and contractor. Relevant and timely information manage by sophisticated BUSCLIS with the database management system MySQL

  16. Early identification and management of critical incident stress.

    Science.gov (United States)

    Caine, Randy M; Ter-Bagdasarian, Levon

    2003-02-01

    Everyone experiences stress. That stress may be related to work (internal), community (external), or family; it may be cumulative or related to a particular critical incident. The cost related to treating acute stress is staggering, both to individuals and to organizations. Critical care nurses are well educated in the physiological responses to the stress of acute illness. Recognizing the emotional impact of stress and the techniques to manage it in themselves and in those with whom they work is equally as important. CISD is widely advocated as an intervention after critical incidents. Although debriefing in and of itself is effective, a single-session semistructured crisis intervention will not prevent posttraumatic stress; thus, the use of CISD as part of a comprehensive multifaceted approach to the management of acute stress related to a critical incident is recommended.

  17. A Planning Tool for Estimating Waste Generated by a Radiological Incident and Subsequent Decontamination Efforts - 13569

    International Nuclear Information System (INIS)

    Boe, Timothy; Lemieux, Paul; Schultheisz, Daniel; Peake, Tom; Hayes, Colin

    2013-01-01

    Management of debris and waste from a wide-area radiological incident would probably constitute a significant percentage of the total remediation cost and effort. The U.S. Environmental Protection Agency's (EPA's) Waste Estimation Support Tool (WEST) is a unique planning tool for estimating the potential volume and radioactivity levels of waste generated by a radiological incident and subsequent decontamination efforts. The WEST was developed to support planners and decision makers by generating a first-order estimate of the quantity and characteristics of waste resulting from a radiological incident. The tool then allows the user to evaluate the impact of various decontamination/demolition strategies on the waste types and volumes generated. WEST consists of a suite of standalone applications and Esri R ArcGIS R scripts for rapidly estimating waste inventories and levels of radioactivity generated from a radiological contamination incident as a function of user-defined decontamination and demolition approaches. WEST accepts Geographic Information System (GIS) shape-files defining contaminated areas and extent of contamination. Building stock information, including square footage, building counts, and building composition estimates are then generated using the Federal Emergency Management Agency's (FEMA's) Hazus R -MH software. WEST then identifies outdoor surfaces based on the application of pattern recognition to overhead aerial imagery. The results from the GIS calculations are then fed into a Microsoft Excel R 2007 spreadsheet with a custom graphical user interface where the user can examine the impact of various decontamination/demolition scenarios on the quantity, characteristics, and residual radioactivity of the resulting waste streams. (authors)

  18. Incidence and management of postoperative bile leaks: A ...

    African Journals Online (AJOL)

    Incidence and management of postoperative bile leaks: A prospective cohort analysis of 467 liver resections. A.J. Dell, J.E.J. Krige, E. Jonas, S.R. Thomson, S.J. Beningfield, U.K. Kotze, S.A. Tromp, S. Burmeister, M.M. Bernon, P.C. Bornman ...

  19. Land Management and Means of Planning Control

    DEFF Research Database (Denmark)

    Enemark, Stig

    2006-01-01

    or jurisdiction. The paper then identifies the different means of planning control such as a centralized versus a decentralized approach and planning led versus a market marked led approach. This is presented in a European context through a short overview of the various planning systems that reflect...... the historical and cultural developments of the European countries. Finally, the paper presents a short overview of the Danish approach to planning and landuse management as an example of a planning led approach placing the decision-making power especially at the local level. This concept of decentralization...... it shortly: “Planning is politics”....

  20. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  1. Regional coordination in medical emergencies and major incidents; plan, execute and teach

    Directory of Open Access Journals (Sweden)

    Hedelin Annika

    2009-07-01

    Full Text Available Abstract Background Although disasters and major incidents are difficult to predict, the results can be mitigated through planning, training and coordinated management of available resources. Following a fire in a disco in Gothenburg, causing 63 deaths and over 200 casualties, a medical disaster response centre was created. The center was given the task to coordinate risk assessments, disaster planning and training of staff within the region and on an executive level, to be the point of contact (POC with authority to act as "gold control," i.e. to take immediate strategic command over all medical resources within the region if needed. The aim of this study was to find out if the centre had achieved its tasks by analyzing its activities. Methods All details concerning alerts of the regional POC was entered a web-based log by the duty officer. The data registered in this database was analyzed during a 3-year period. Results There was an increase in number of alerts between 2006 and 2008, which resulted in 6293 activities including risk assessments and 4473 contacts with major institutions or key persons to coordinate or initiate actions. Eighty five percent of the missions were completed within 24 h. Twenty eight exercises were performed of which 4 lasted more than 24 h. The centre also offered 145 courses in disaster and emergency medicine and crisis communication. Conclusion The data presented in this study indicates that the center had achieved its primary tasks. Such regional organization with executive, planning, teaching and training responsibilities offers possibilities for planning, teaching and training disaster medicine by giving immediate feed-back based on real incidents.

  2. EAP-based critical incident stress management: utilization of a practice-based assessment of incident severity level in responding to workplace trauma.

    Science.gov (United States)

    DeFraia, Gary S

    2013-01-01

    Central to the field of trauma psychology is assessment of the impact of critical incidents on individuals, as measured by individual symptoms of stress. Accordingly, the trauma literature reflects a proliferation of clinical impact of event scales. Workplace incidents however, affect not only individual employees, but also work organizations, requiring a multi-level response. Critical incident stress management (CISM) is the most prevalent multi-level incident response strategy utilized by organizations, often through specialized CISM units operating within their employee assistance programs (EAPs). While EAP-based CISM units seeks to support both individuals and organizations, studies focused on individual stress dominate the literature, mirroring assessment scales that tend to emphasize clinical as opposed to organizational practice. This research contributes to less-prevalent studies exploring incident characteristics as disruptive to organizations, rather than clinical symptoms as disruptive to individuals. To measure incident disruption, an EAP-based CISM unit developed a critical incident severity scale. By analyzing this unit's extensive practice database, this exploratory study examines how critical incident severity level varies among various types of incidents. Employing the methodology of clinical data mining, this practice-based research generates evidence-informed practice recommendations in the areas of EAP-based CISM intake assessment, organizational consultation and incident response planning.

  3. [Evaluation model for municipal health planning management].

    Science.gov (United States)

    Berretta, Isabel Quint; Lacerda, Josimari Telino de; Calvo, Maria Cristina Marino

    2011-11-01

    This article presents an evaluation model for municipal health planning management. The basis was a methodological study using the health planning theoretical framework to construct the evaluation matrix, in addition to an understanding of the organization and functioning designed by the Planning System of the Unified National Health System (PlanejaSUS) and definition of responsibilities for the municipal level under the Health Management Pact. The indicators and measures were validated using the consensus technique with specialists in planning and evaluation. The applicability was tested in 271 municipalities (counties) in the State of Santa Catarina, Brazil, based on population size. The proposed model features two evaluative dimensions which reflect the municipal health administrator's commitment to planning: the guarantee of resources and the internal and external relations needed for developing the activities. The data were analyzed using indicators, sub-dimensions, and dimensions. The study concludes that the model is feasible and appropriate for evaluating municipal performance in health planning management.

  4. LLNL Site 200 Risk Management Plan

    International Nuclear Information System (INIS)

    Pinkston, D.; Johnson, M.

    2008-01-01

    It is the Lawrence Livermore National Laboratory's (LLNL) policy to perform work in a manner that protects the health and safety of employees and the public, preserves the quality of the environment, and prevents property damage using the Integrated Safety Management System. The environment, safety, and health are to take priority in the planning and execution of work activities at the Laboratory. Furthermore, it is the policy of LLNL to comply with applicable ES and H laws, regulations, and requirements (LLNL Environment, Safety and Health Manual, Document 1.2, ES and H Policies of LLNL). The program and policies that improve LLNL's ability to prevent or mitigate accidental releases are described in the LLNL Environment, Health, and Safety Manual that is available to the public. The laboratory uses an emergency management system known as the Incident Command System, in accordance with the California Standardized Emergency Management System (SEMS) to respond to Operational Emergencies and to mitigate consequences resulting from them. Operational Emergencies are defined as unplanned, significant events or conditions that require time-urgent response from outside the immediate area of the incident that could seriously impact the safety or security of the public, LLNL's employees, its facilities, or the environment. The Emergency Plan contains LLNL's Operational Emergency response policies, commitments, and institutional responsibilities for managing and recovering from emergencies. It is not possible to list in the Emergency Plan all events that could occur during any given emergency situation. However, a combination of hazard assessments, an effective Emergency Plan, and Emergency Plan Implementing Procedures (EPIPs) can provide the framework for responses to postulated emergency situations. Revision 7, 2004 of the above mentioned LLNL Emergency Plan is available to the public. The most recent revision of the LLNL Emergency Plan LLNL-AM-402556, Revision 11, March

  5. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  6. Safety Incident Management Team Report for NIMLT Case 50796

    LENUS (Irish Health Repository)

    2017-01-17

    This is a report on the management of a patient safety incident involving BowelScreen and symptomatic colonoscopy services at Wexford General Hospital (WGH). The patient safety incident relates to the work of a Consultant Endoscopist (referred to as Clinician Y) employed by WGH who undertook screening colonoscopies on behalf of the BowelScreen Programme since the commencement of the screening programme in WGH in March 2013. Clinician Y also performed non-screening colonoscopies for the diagnosis of symptomatic patients as part of routine surgical service provision at WGH.\\r\

  7. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software, as well as any custom developed software. This plan establishes requirements and processes for uniform documentation and coordination of HANDI 2000. This SCMP becomes effective as of this document's acceptance and will provide guidance through implementation efforts.

  8. Automated transportation management system (ATMS) software project management plan (SPMP)

    Energy Technology Data Exchange (ETDEWEB)

    Weidert, R.S., Westinghouse Hanford

    1996-05-20

    The Automated Transportation Management System (ATMS) Software Project Management plan (SPMP) is the lead planning document governing the life cycle of the ATMS and its integration into the Transportation Information Network (TIN). This SPMP defines the project tasks, deliverables, and high level schedules involved in developing the client/server ATMS software.

  9. Waste Isolation Pilot Plant, Land Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives.

  10. Waste Isolation Pilot Plant, Land Management Plan

    International Nuclear Information System (INIS)

    1993-01-01

    To reflect the requirement of section 4 of the Wastes Isolation Pilot Plant Land Withdrawal Act (the Act) (Public Law 102-579), this land management plan has been written for the withdrawal area consistent with the Federal Land Policy and Management Act of 1976. The objective of this document, per the Act, is to describe the plan for the use of the withdrawn land until the end of the decommissioning phase. The plan identifies resource values within the withdrawal area and promotes the concept of multiple-use management. The plan also provides opportunity for participation in the land use planning process by the public and local, State, and Federal agencies. Chapter 1, Introduction, provides the reader with the purpose of this land management plan as well as an overview of the Waste Isolation Pilot Plant. Chapter 2, Affected Environment, is a brief description of the existing resources within the withdrawal area. Chapter 3, Management Objectives and Planned Actions, describes the land management objectives and actions taken to accomplish these objectives

  11. Analytical framework for River Basin Management Planning

    DEFF Research Database (Denmark)

    Nielsen, Helle Ørsted; Pedersen, Anders Branth; Frederiksen, Pia

    This paper proposes a framework for the analysis of the planning approach, and the processes and procedures, which have been followed in the preparation of the River Basin District Management Plans (RBMPs). Different countries have different policy and planning traditions and -styles. Developed...... over a range of years, institutional set-up and procedures have been adapted to these. The Water Framework Directive imposes a specific ecosystem oriented management approach, which directs planning to the fulfilment of objectives linked to specific water bodies, and an emphasis on the involvement...... of stakeholders and citizens. Institutional scholars point out that such an eco-system based approach superimposed on an existing institutional set-up for spatial planning and environmental management may create implementation problems due to institutional misfit (Moss 2004). A need for adaptation of procedures...

  12. STRATEGIC PLANNING IN INFORMATION RESOURCES MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Cezar VASILESCU

    2013-10-01

    Full Text Available The field of strategic management has offered a variety of frameworks and concepts for the past years, many with the declared aim of “taking business and its management seriously”. Strategic planning can help an organization to build its sustained competitive advantage in the face of an uncertain marketplace, but it requires new ways of thinking in order to create feasible alternatives. This article examines how the Chief Information Officer (CIO can use strategy and planning as an enabler to meet the mission of an organization. The analysis focuses on some common problems that occur in strategic planning. Managers need to identify these potential issues, so that they can recognize and deal with them if they arise in their own strategic planning. A systems approach is taken which presents planning as an open inclusive process that seeks to produce flexible systems capable of growth and adaptation to meet changing needs and missions.

  13. Critical incident stress management in a school setting following police shooting of an adolescent.

    Science.gov (United States)

    Miller, Ronald L; Grueninger, Carl E

    2010-01-01

    Cincinnati Public Schools Critical Incident Stress Management Team responded when a teenager who was in possession of a pellet gun was killed by police. The themes that emerged had more to do with rage than typical bereavement or trauma responses. The primary objective was the prevention of school and community violence. Strategic planning was critical in preventing violence and responding to the changing needs of students, staff and families during the weeks following this tragedy. Team members had to consider cultural differences related to interpretation of events, grieving rituals, and expectations for appropriate behavior when planning and providing interventions.

  14. Checklist for Reviewing EPA Quality Management Plans

    Science.gov (United States)

    This checklist will be used to review the Quality Management Plans (QMPs) that are submitted to the Quality Staff of the Office of Environmental Information (OEI) for Agency review under EPA Order 5360.1 A2.

  15. Managing infrastructure and underpinning the planned environment

    CSIR Research Space (South Africa)

    Wall, K

    2008-04-01

    Full Text Available Planning the built environment is, or should be, also about providing and managing (i.e. operating and maintaining) this environment, viz. the engineering infrastructure (much of which is underground), structures and public amenities. However, never...

  16. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  17. BROOKHAVEN NATIONAL LABORATORY WILDLIFE MANAGEMENT PLAN.

    Energy Technology Data Exchange (ETDEWEB)

    NAIDU,J.R.

    2002-10-22

    The purpose of the Wildlife Management Plan (WMP) is to promote stewardship of the natural resources found at the Brookhaven National Laboratory (BNL), and to integrate their protection with pursuit of the Laboratory's mission.

  18. Introduction to Soil Fumigant Management Plans

    Science.gov (United States)

    Soil fumigant pesticide labels require users to prepare a site-specific fumigation management plan (FMP) before the application begins. EPA has developed templates that outline the elements required by the labels.

  19. MDOT Materials Laboratories : Environmental Management Plan

    Science.gov (United States)

    2012-06-01

    The goal of this EMP was to develop and implement a comprehensive Environmental : Management Plan for MDOT Materials Laboratories. This goal was achieved through : perfonnance of environmental audits to identify potential environmental impacts, and b...

  20. Special event planning for the emergency manager.

    Science.gov (United States)

    Gaynor, Peter T

    2009-11-01

    In the domain of emergency management and homeland security there is a lack of a formal planning process at the local level when it comes to special event planning. The unique nature of special event planning demands an understanding of the planning process for both traditional and non-traditional planning partners. This understanding will make certain that local governments apply due diligence when planning for the safety of the public. This paper offers a practical roadmap for planning at the local level. It will address those 'special events' that are beyond routine local events but not of a sufficient scale to be granted National Special Security Event status. Due to the infrequency of 'special events' in most communities, it is imperative that deliberate planning takes place. Upon conclusion, the reader will be able to construct a planning process tailored to the needs of their community, guide both traditional and non-traditional planning partners through the planning process, determine priorities, explore alternatives, plan for contingencies, conduct a confirmation brief, facilitate operations and assemble an after-action report and improvement plan.

  1. Sample Lesson Plans. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    This guide is part of the Management for Effective Teaching (MET) support kit, a pilot project developed by the Fairfax County (Virginia) Public Schools to assist elementary school teachers in planning, managaing, and implementing the county's curriculum, Program of Studies (POS). In this guide, a sample lesson plan of a teaching-learning activity…

  2. Time-Management Planning for Educational Facilities.

    Science.gov (United States)

    McIsaac, Donald N.; And Others

    Three conference papers concerned with systems analysis and time management planning. One paper is concerned with techniques, especially the application of the "critical path method" or PERT (Program Evaluation Review Technique) in planning construction activities. A second paper concerns problems associated with collecting and communicating…

  3. Draft of the PHENIX Management Plan

    International Nuclear Information System (INIS)

    1994-01-01

    The PHENIX Management Plan provides the baselines and controls that the PHENIX and RHIC Projects will follow to meet the technical, cost, and schedule goals for the PHENIX detector at RHIC. This plan will be reviewed and updated as required, with revisions made by agreement among the signed participants

  4. Project Management Plan for Material Stabilization

    International Nuclear Information System (INIS)

    SPEER, D.R.

    1999-01-01

    This plan presents the overall objectives, description, justification and planning for the plutonium Finishing Plant (PFP) Materials Stabilization project. The intent of this plan is to describe how this project will be managed and integrated with other facility stabilization and deactivation activities. This plan supplements the overall integrated plan presented in the Plutonium Finishing Plant Integrated Project Management Plan (IPMP), HNF-3617/Rev. 0. This is the top-level definitive project management document that specifies the technical (work scope), schedule, and cost baselines to manager the execution of this project. It describes the organizational approach and roles/responsibilities to be implemented to execute the project. This plan is under configuration management and any deviations must be authorized by appropriate change control action. Materials stabilization is designated the responsibility to open and stabilize containers of plutonium metal, oxides, alloys, compounds, and sources. Each of these items is at least 30 weight percent plutonium/uranium. The output of this project will be containers of materials in a safe and stable form suitable for storage pending final packaging and/or transportation offsite. The corrosion products along with oxides and compounds will be stabilized via muffle furnaces to reduce the materials to high fired oxides

  5. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  6. Louisiana Marsh Management Plan 1995

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — We sampled experimental research areas in the Barataria Basin of Louisiana during March and May, 1995, to examine the effects of structural marsh management on...

  7. 40 CFR 130.6 - Water quality management plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Water quality management plans. 130.6... QUALITY PLANNING AND MANAGEMENT § 130.6 Water quality management plans. (a) Water quality management (WQM... and certified and approved updates to those plans. Continuing water quality planning shall be based...

  8. Coordinating a multiple casualty Critical Incident Stress Management (CISM) response within a medical/surgical hospital setting.

    Science.gov (United States)

    Morrow, H E

    2001-01-01

    The medical/surgical hospital environment presents numerous challenges to a Critical Incident Stress Management (CISM) Team Coordinator responsible for implementing a psychological crisis intervention. Often this person is responsible for managing a response to a large in-house multiple-casualty incident, sometimes involving fatalities. Many mental health professionals have not had the opportunity to work in a medical/surgical healthcare facility and consequently are not familiar with the environment (and agency culture) that exists within these employment settings. This article will review important factors to be considered during the initial assessment of a critical incident in a hospital setting, logistical concerns that are unique to this setting, and the subsequent planning of the Critical Incident Stress Management Team crisis management response.

  9. Graduate Student Project: Operations Management Product Plan

    Science.gov (United States)

    Fish, Lynn

    2007-01-01

    An operations management product project is an effective instructional technique that fills a void in current operations management literature in product planning. More than 94.1% of 286 graduates favored the project as a learning tool, and results demonstrate the significant impact the project had in predicting student performance. The author…

  10. Teacher Plan Book. Management for Effective Teaching.

    Science.gov (United States)

    Fairfax County Public Schools, VA. Dept. of Instructional Services.

    Project MET (Management for Effective Teaching) is a pilot project that provides effective, practical ways of managing the Fairfax County (Virginia) Public School system's instructional Program of Studies (POS) for elementary school students. This planning booklet is a part of the support kit that is used by teachers as an aid to implementing…

  11. Planning, Designing and Managing Higher Education Institutions

    Science.gov (United States)

    Daigneau, William A.; Valenti, Mark S.; Ricciarini, Sylvana; Bender, Stephen O.; Alleyne, Nicole; Di Grappa, Michael; Duart, Josep M.; Lupianez, Francisco; Sanchez, Miguel Angel Ehrenzweig

    2005-01-01

    The OECD Programme on Educational Building, together with the Association of Higher Education Facilities Officers (APPA) and the OECD Programme on Institutional Management in Higher Education, organised an international conference on the planning, design and management of facilities for higher education institutions on April 24-27, 2005. The…

  12. Spent Nuclear Fuel Project Document Management Plan

    International Nuclear Information System (INIS)

    Connor, M.D.; Harizison, G.L.; Rice, W.C.

    1995-12-01

    The SNF Project Document Management Plan identifies and describes the currently available systems and processes for implementing and maintaining an effective document control and records management program. This program governs the methods by which documents are generated, released, distributed, maintained current, retired, and ultimately disposed

  13. How a major incident plan can be used in an acute healthcare setting.

    Science.gov (United States)

    Makin, Seth; Smith, L; McDevitt, K

    2018-04-06

    All NHS Trusts face a diverse range of potential threats and disruptions that can overwhelm the delivery of their routine healthcare services. Major incidents range from significant infrastructure failure to responding to significant casualty numbers from natural disasters and malicious incidents. Major incident plans are one of the body of documents that support trusts and in this instance acute NHS trusts in emergency preparedness. Major incident plans can be used as a reference point for staff of all disciplines, that is, clinical and non-clinical. Major incident plans incorporate the requirements of the Civil Contingencies Act 2004 for NHS-funded providers to ensure trusts conduct risk assessments, emergency planning, cooperating with other organisations, and internal and external communication. This paper summarises some of the key aspects in the construction and the use of major incident plans in acute care trusts. © Article author(s) (or their employer(s) unless otherwise stated in the text of the article) 2018. All rights reserved. No commercial use is permitted unless otherwise expressly granted.

  14. Management plan for the Nuclear Standards Program

    International Nuclear Information System (INIS)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy

  15. Management plan for the Nuclear Standards Program

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-01

    This Management Plan was prepared to describe the manner in which Oak Ridge National Laboratory will provide technical management of the Nuclear Standards Program. The organizational structure that has been established within ORNL for this function is the Nuclear Standards Management Center, which includes the Nuclear Standards Office (NSO) already in existence at ORNL. This plan is intended to support the policies and practices for the development and application of technical standards in ETN projects, programs, and technology developments as set forth in a standards policy memorandum from the DOE Program Director for Nuclear Energy.

  16. Conservation Management Plan as a cultural heritage protection methodology

    OpenAIRE

    Rafał, Trzaska

    2018-01-01

    In this paper author describe how important is conservation management plan. Conservation management plan do not have support in law articles, therefore authors which create documents (documents in meaning conservation management plans) have not defined what they should put in to it. In this case, wrong written conservation management plan often is harmful than helpful for conservation management process.

  17. Medical management of three workers following a radiation exposure incident

    International Nuclear Information System (INIS)

    House, R.A.; Sax, S.E.; Rumack, E.R.; Holness, D.L.

    1992-01-01

    The medical management of three individuals involved in an exposure incident to whole-body radiation at a nuclear generating plant of a Canadian electrical utility is described. The exposure incident resulted in the two highest whole-body radiation doses ever received in a single event by workers in a Canadian nuclear power plant. The individual whole-body doses (127.4 mSv, 92.0 mSv, 22.4 mSv) were below the threshold for acute radiation sickness but the exposures still presented medical management problems related to assessment and counseling. Serial blood counting and lymphocyte cytogenetic analysis to corroborate the physical dosimetry were performed. All three employees experienced somatic symptoms due to stress and one employee developed post-traumatic stress disorder. This incident indicates that there is a need in such radiation exposure accidents for early and continued counseling of exposed employees to minimize the risk of development of stress-related symptoms

  18. Medical management of three workers following a radiation exposure incident

    Energy Technology Data Exchange (ETDEWEB)

    House, R.A.; Sax, S.E.; Rumack, E.R.; Holness, D.L. (Department of Occupational and Environmental Health, St. Michael' s Hospital, Toronto, Ontario (Canada))

    1992-01-01

    The medical management of three individuals involved in an exposure incident to whole-body radiation at a nuclear generating plant of a Canadian electrical utility is described. The exposure incident resulted in the two highest whole-body radiation doses ever received in a single event by workers in a Canadian nuclear power plant. The individual whole-body doses (127.4 mSv, 92.0 mSv, 22.4 mSv) were below the threshold for acute radiation sickness but the exposures still presented medical management problems related to assessment and counseling. Serial blood counting and lymphocyte cytogenetic analysis to corroborate the physical dosimetry were performed. All three employees experienced somatic symptoms due to stress and one employee developed post-traumatic stress disorder. This incident indicates that there is a need in such radiation exposure accidents for early and continued counseling of exposed employees to minimize the risk of development of stress-related symptoms.

  19. Obstetric anal sphincter injury: incidence, risk factors, and management.

    Science.gov (United States)

    Dudding, Thomas C; Vaizey, Carolynne J; Kamm, Michael A

    2008-02-01

    Obstetric sphincter damage is the most common cause of fecal incontinence in women. This review aimed to survey the literature, and reach a consensus, on its incidence, risk factors, and management. This systematic review identified relevant studies from the following sources: Medline, Cochrane database, cross referencing from identified articles, conference abstracts and proceedings, and guidelines published by the National Institute of Clinical Excellence (United Kingdom), Royal College of Obstetricians and Gynaecologists (United Kingdom), and American College of Obstetricians and Gynecologists. A total of 451 articles and abstracts were reviewed. There was a wide variation in the reported incidence of anal sphincter muscle injury from childbirth, with the true incidence likely to be approximately 11% of postpartum women. Risk factors for injury included instrumental delivery, prolonged second stage of labor, birth weight greater than 4 kg, fetal occipitoposterior presentation, and episiotomy. First vaginal delivery, induction of labor, epidural anesthesia, early pushing, and active restraint of the fetal head during delivery may be associated with an increased risk of sphincter trauma. The majority of sphincter tears can be identified clinically by a suitably trained clinician. In those with recognized tears at the time of delivery repair should be performed using long-term absorbable sutures. Patients presenting later with fecal incontinence may be managed successfully using antidiarrheal drugs and biofeedback. In those who fail conservative treatment, and who have a substantial sphincter disruption, elective repair may be attempted. The results of primary and elective repair may deteriorate with time. Sacral nerve stimulation may be an appropriate alternative treatment modality. Obstetric anal sphincter damage, and related fecal incontinence, are common. Risk factors for such trauma are well recognized, and should allow for reduction of injury by proactive

  20. Hanford cultural resources management plan

    Energy Technology Data Exchange (ETDEWEB)

    Chatters, J.C. (ed.)

    1989-06-01

    As a federal agency, the US Department of Energy (DOE) has been directed by Congress and the President to provide leadership in the preservation of prehistoric, historical, and cultural resources on lands it administers, to manage these in a spirit of stewardship for future generations, and to protect and preserve the rights of Native Americans to religious freedom. The purpose of this document is to describe how the DOE-Richland Operations (DOE-RL) will meet those responsibilities on the Hanford Site, pursuant to guidelines for Agency Responsibilities under the Historic Preservation Act (FR 53:31, February 17, 1988). This document is intended for multiple uses. Among other things, the text is designed as a manual for cultural resource managers to follow and as an explanation of the process of cultural resource regulatory compliance for the DOE-RL and Site contractors. 10 refs., 17 figs., 11 tabs.

  1. Parking management : strategies, evaluation and planning

    International Nuclear Information System (INIS)

    Litman, T.A.

    2006-01-01

    Parking facilities are a major cost to society. Current planning practices are based on the assumption that parking should be abundant and provided free, with costs borne indirectly. This report examined parking management strategies related to integrated parking plans. Problems with current parking planning practices were reviewed. The costs of parking facilities were examined, as well as the savings that can accrue from improved management techniques. Strategies included shared parking; remote parking and shuttle services; walking and cycling improvements; improved enforcement and control; and increasing the capacity of existing parking facilities. Parking pricing methods, financial incentives and parking tax reforms were reviewed. Issues concerning user information and marketing were examined. Overflow parking plans were evaluated. Three illustrative examples of parking management programs were outlined, along with details of implementation, planning and evaluation procedures. It was concluded that cost-effective parking management programs can often reduce parking requirements by 20 to 40 per cent compared with conventional planning requirements, in addition to providing economic, social and environmental benefits. 32 refs., 7 tabs., 3 figs

  2. Technical assistance contractor Management Plan

    International Nuclear Information System (INIS)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins ampersand Beckwith Agra, Inc. (SHB Agra), and Geraghty ampersand Miller, Inc. (G ampersand M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC's groundwater technical breadth and depth, so G ampersand M was brought in to augment the team's capabilities. The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC's management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls

  3. Construction contractors involvement in disaster management planning

    Directory of Open Access Journals (Sweden)

    Peter Stringfellow

    2014-06-01

    Full Text Available Disasters, both natural and man-made, cause major damage and loss of life. Because of this, governments around the world are looking at building resilience to ensure communities can recover quickly and have minimal impact from a disaster. Part of building resilience is to plan for disaster management and recovery. Literature reveals that construction contractors can play a critical role within this process as they have control of resource supply chains and key knowledge and skills they are well suited to assist in disaster planning. However, as literature also reveals there is currently little involvement of construction contractors in the disaster planning process. This gap between what should be done and what is currently done is investigated. Representatives from industry bodies are interviewed to determine their understanding of the industry’s involvement in disaster planning and what capacity the industry might have to be involved. The interviewee’s responses agree with current literature that there is currently little or no involvement with disaster planning however there is interest in being involved with disaster management planning if there was a forum for this to occur. Based on the responses the researcher has proposed a model to engage construction contractors within state government disaster management planning.

  4. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  5. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  6. Persistent perineal sinus. Incidence, pathogenesis, risk factors, and management

    International Nuclear Information System (INIS)

    Lohsiriwat, V.

    2009-01-01

    This review discusses the incidence, pathogenesis, risk factors, diagnosis, and therapeutic options for persistent perineal sinus (PPS), defined as a perineal wound that remains unhealed more than 6 months after surgery. The incidence of PPS after surgery for inflammatory bowel disease (IBD) ranges from 3% to 70% and after abdominoperineal resection (APR) for Low rectal cancer, it can be up to 30%. These unhealed wounds are frequently related to perioperative pelvic or perineal sepsis. Crohn's disease (CD) and neoadjuvant radiation therapy are also important risk factors. The management of PPS is based on an understanding of pathogenesis and clinical grounds. The advantages and disadvantages of the current therapeutic approaches, including the topical administration of various drugs, vacuum-assisted closure, and perineal reconstruction with a muscle flap or a myocutaneous flap are also discussed. (author)

  7. Software configuration management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Software Configuration Management Plan (SCMP) describes the configuration management and control environment for HANDI 2000 for the PP and PS software as well as any custom developed software. This plan establishes requirements and processes for uniform documentation control, system change control, systematic evaluation and coordination of HANDI 2000. This SCMP becomes effective as this document is acceptance and will provide guidance through implementation efforts.

  8. Orbital cellulitis in Scotland: current incidence, aetiology, management and outcomes.

    Science.gov (United States)

    Murphy, C; Livingstone, I; Foot, B; Murgatroyd, H; MacEwen, C J

    2014-11-01

    Orbital cellulitis is a potentially blinding and life-threatening condition. There are little published data on the incidence of orbital cellulitis and little is known about the differences between children and adults affected. The purpose of this study was to identify the incidence, aetiology, management and outcome of orbital cellulitis in children and adults in Scotland. This study was a 1-year prospective observational study using the Scottish Ophthalmic Surveillance Unit reporting system among Scottish ophthalmologists. The response rate from ophthalmologists was 66.4%. There were 15 children and 5 adults reported giving an incidence of 1.6 per 100 000 and 0.1 per 100 000 in children and adults, respectively. 47% of children had a preceding upper respiratory tract infection with 87% having radiological evidence of sinus disease. Within the adult group, there was preceding immunosuppression and trauma. Streptococcus (66%) and Haemophilus (46%) species were the most commonly isolated pathogens in children. Respiratory pathogens were less predictable in adults. All patients were treated with intravenous antibiotics. All children with orbital and subperiosteal abscesses had surgery; one adult with orbital abscess did not have surgery. There were two cases of series morbidity: one intracranial spread of infection and one evisceration. The incidence of orbital cellulitis is higher in children than in adults. In children, it commonly follows upper respiratory infection and sinus disease; however, in adults, preceding illness and trauma are more common. Respiratory pathogens are common in affected children. Intravenous antibiotics and surgical treatment of abscesses remain the preferred management. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://group.bmj.com/group/rights-licensing/permissions.

  9. Healthcare logistics in disaster planning and emergency management: A perspective.

    Science.gov (United States)

    VanVactor, Jerry D

    2017-12-01

    This paper discusses the role of healthcare supply chain management in disaster mitigation and management. While there is an abundance of literature examining emergency management and disaster preparedness efforts across an array of industries, little information has been directed specifically toward the emergency interface, interoperability and unconventional relationships among civilian institutions and the US Department of Defense (US DoD) or supply chain operations involved therein. To address this imbalance, this paper provides US DoD healthcare supply chain managers with concepts related to communicating and planning more effectively. It is worth remembering, however, that all disasters are local - under the auspice of tiered response involving federal agencies, the principal responsibility for responding to domestic disasters and emergencies rests with the lowest level of government equipped and able to deal with the incident effectively. As such, the findings are equally applicable to institutions outside the military. It also bears repeating that every crisis is unique: there is no such thing as a uniform response for every incident. The role of the US DoD in emergency preparedness and disaster planning is changing and will continue to do so as the need for roles in support of a larger effort also continues to change.

  10. FY 2001 Hanford Waste Management Strategic Plan

    International Nuclear Information System (INIS)

    COLLINS, M.S.

    2001-01-01

    We are pleased to present the 2001 Hanford Waste Management Program Strategic Plan. This plan supports the newly developed U. S. Department of Energy Site outcomes strategy. The 2001 Plan reflects current and projected needs for Waste Management Program services in support of Hanford Site cleanup, and updates the objectives and actions using new waste stream oriented logic for the strategic goals: (1) waste treatment/processing, storage, and disposal; (2) interfaces; and (3) program excellence. Overall direction for the Program is provided by the Waste Management Division, Office of the Assistant Manager for Environmental Restoration and Waste Management, U. S. Department of Energy, Richland Operations Office. Fluor Hanford, Inc. is the operating contractor for the program. This Plan documents proactive strategies for planning and budgeting, with a major focus on helping meet regulatory commitments in a timely and efficient manner and concurrently assisting us in completing programs cheaper, better and quicker. Newly developed waste stream oriented logic was incorporated to clarify Site outcomes. External drivers, technology inputs, treatment/processing, storage and disposal strategies, and stream specific strategies are included for the six major waste types addressed in this Plan (low-level waste, mixed low-level waste, contact-handled transuranic waste, remote-handled transuranic waste, liquid waste, and cesium/strontium capsules). The key elements of the strategy are identification and quantification of the needs for waste management services, assessment of capabilities, and development of cost-effective actions to meet the needs and to continuously improve performance. Accomplishment of specific actions as set forth in the Plan depends on continued availability of the required resources and funding. The primary objectives of Plan are: (1) enhance the Waste Management Program to improve flexibility, become more holistic especially by implementing new

  11. Post-event reviews: Using a quantitative approach for analysing incident response to demonstrate the value of business continuity programmes and increase planning efficiency.

    Science.gov (United States)

    Vaidyanathan, Karthik

    2017-01-01

    Business continuity management is often thought of as a proactive planning process for minimising impact from large-scale incidents and disasters. While this is true, and it is critical to plan for the worst, consistently validating plan effectiveness against smaller disruptions can enable an organisation to gain key insights about its business continuity readiness, drive programme improvements, reduce costs and provide an opportunity to quantitatively demonstrate the value of the programme to management. This paper describes a post mortem framework which is used as a continuous improvement mechanism for tracking, reviewing and learning from real-world events at Microsoft Customer Service & Support. This approach was developed and adopted because conducting regular business continuity exercises proved difficult and expensive in a complex and distributed operations environment with high availability requirements. Using a quantitative approach to measure response to incidents, and categorising outcomes based on such responses, enables business continuity teams to provide data-driven insights to leadership, change perceptions of incident root cause, and instil a higher level of confidence towards disaster response readiness and incident management. The scope of the framework discussed here is specific to reviewing and driving improvements from operational incidents. However, the concept can be extended to learning and evolving readiness plans for other types of incidents.

  12. Oak Ridge National Laboratory Waste Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented

  13. Management of response to the polonium-210 incident in London

    International Nuclear Information System (INIS)

    Croft, John; Bailey, Michael; Tattersall, Phil; Morrey, Mary; McColl, Neil; Prosser, Lesley; Maguire, Helen; Fraser, Graham; Gross, Roger

    2008-01-01

    On the 23 November 2006, Alexander Litvinenko died in London allegedly from poisoning by 210 Po, an alpha particle emitter. The spread of radioactive contamination, arising from the poisoning and the events leading up to it, involved many locations in London. The potential for intakes of 210 Po arising from the contamination posed a public health risk and generated significant public concern. The scale of the event required a multi-agency response, including top level UK Government emergency response management arrangements. The Health Protection Agency (HPA) had a leading role in co-ordinating and managing the public health response. This paper reviews the management of the incident response and the issues involved. The fatal poisoning of Mr Litvinenko with 210 Po, and the associated public health hazard from the spread of contamination to many locations across London, was an unprecedented event. Fortunately, no one else is known to have suffered any acute effects. Results from the programme of individual monitoring showed that whilst more than 100 people had measurable intakes of 210 Po, only 17 had assessed doses in excess of 6 mSv. The highest dose of about 100 mSv gives rise to an increased risk of fatal cancer of about 0.5%, compared with the natural incidence of about 25%. The incident required a co-ordinated and sustained multi-agency emergency response. The Health Protection Agency, as the lead on public health matters played a significant role in this. Whilst inevitably some lessons have been identified, the response is considered to have been very effective and to have benefited from the wide spectrum of experience and expertise developed through normal work, together with the effort put into emergency preparedness and the various emergency response. (author)

  14. Energy management, planning, and program development

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-01-01

    The Ohio ERDA is statutorily required to maintain an energy-planning capability and to manage a programmatic effort to bring Ohio energy supply and demand into balance consistent with the state's growth and development needs. The Ohio Energy Information System is the major planning tool and it encompasses the Ohio Energy Data Base, the Energy Short-Term Emergency Evalution Model, and a capability to assess alternative-policy-action impacts. A discussion of the program is presented. (MCW)

  15. PFP Interface identification and management planning guide

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  16. Planning and management for reactor decommissioning

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko

    2001-01-01

    This report describes decommissioning strategy, planning process, regulation, management and organization, radiological characterization and safety. Planning is used to identify, define and organize the requirements for decommissioning including decommissioning options, items to be accomplished (objective, scope), to solve problems of how it is to be accomplished (methods, means and procedures), questions of who will execute it (resources, organization and responsibilities, interfacing), and time when it will be executed (schedule for meeting the objectives). A plan is highly dependent on the quality of the management team assembled to carry it out. Radiological characterization involves a survey of existing data, calculation, in situ measurements and/or sampling and analyses. Using this databases decommissioning planner may assess options, considering: decontamination processes, dismantling procedures, tools required, radiological protection of workers and public/environment, waste classification, and resulting costs. Comparison and optimization of these factors will lead to selection of a decommissioning strategy, i.e. typically, immediate or deferred dismantling. The planning and implementation of decommissioning for nuclear reactors should be referred both recent dismantling techniques and many decommissioning experiences. The technical lessons learned from many projects will help in the planning for future decommissioning projects. And systematic planning and management are essential to successful completion of a decommissioning project. (author)

  17. Form planning Control to growth management

    DEFF Research Database (Denmark)

    Enemark, Stig

    2016-01-01

    -right government decided to transfer national planning functions from the Ministry of the Environment (Miljøministeriet) to the Danish Business Authority (Erhvervsstyrelsen). This was done in the midst of an on-going political debate over ‘simplifying’ the Planning Act to facilitate more economic growth....... In this light, Danish spatial planning continues to align with prevailing neo-liberal minded government agendas and thereby ends up reflecting the ideologies and interests of the government in place. In contrast with the social welfarist objectives of the 1970s, these governmental preferences have indirectly...... caused that spatial planning be regarded more as a cost than an asset. Accordingly, it is evident that the Danish planning domain has progressively lost political clout and the focus is changed towards facilitation and management of economic growth....

  18. BUSINESS PLAN AS A MANAGEMENT TOOL

    Directory of Open Access Journals (Sweden)

    BRAG Ă FILOFTEIA VIORICA

    2013-02-01

    Full Text Available Most business people think of the business plans when they starting a new business or submitting documentation for accessing the funding source. The business plan involves a thinking perspective on the business, beginning from the set objectives, includes all the stages and resources they need to achieve them over a period of time. Therefore, in this article, we emphasize that they are equally useful for the daily management of a business, even if a business needs or not the new investment. Businesses need plans to optimize the growth and the development in accordance with the priorities.

  19. Solid waste management complex site development plan

    International Nuclear Information System (INIS)

    Greager, T.M.

    1994-01-01

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated

  20. Solid waste management complex site development plan

    Energy Technology Data Exchange (ETDEWEB)

    Greager, T.M.

    1994-09-30

    The main purpose of this Solid Waste Management Complex Site Development Plan is to optimize the location of future solid waste treatment and storage facilities and the infrastructure required to support them. An overall site plan is recommended. Further, a series of layouts are included that depict site conditions as facilities are constructed at the SWMC site. In this respect the report serves not only as the siting basis for future projects, but provides siting guidance for Project W-112, as well. The plan is intended to function as a template for expected growth of the site over the next 30 years so that future facilities and infrastructure will be properly integrated.

  1. Planning and Management - the Most Neglected Activities in ...

    African Journals Online (AJOL)

    Lexicography has a long history of ineffective planning and inefficient management. This article applies the methods of general planning and management to the planning and management of a lexicographic unit. Keywords: Planning, management, mission statement, strategic focus Areas, performance areas, situational ...

  2. Program for accident and incident management support, AIMS

    International Nuclear Information System (INIS)

    Putra, M.A.

    1993-12-01

    A prototype of an advisory computer program is presented which could be used in monitoring and analyzing an ongoing incident in a nuclear power plant. The advisory computer program, called the Accident and Incident Management Support (AIMS), focuses on processing a set of data that is to be transmitted from a nuclear power plant to a national or regional emergency center during an incident. The AIMS program will assess the reactor conditions by processing the measured plant parameters. The applied model of the power plant contains a level of complexity that is comparable with the simplified plant model that the power plant operator uses. A standardized decay heat function and a steam water property library is used in the integral balance equations for mass and energy. A simulation of the station blackout accident of the Borssele plant is used to test the program. The program predicts successively: (1) the time of dryout of the steam generators, (2) the time of saturation of the primary system, and (3) the onset of core uncovery. The coolant system with the actual water levels will be displayed on the screen. (orig./HP)

  3. Site management plan: Douglas Point Ecological Laboratory

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.

    1979-01-01

    A portion of the Douglas Point Site has been set aside for use as an ecological monitoring facility (DPEL). Plans call for it to provide for long-term scientific study and analysis of specific terrestrial and aquatic ecological systems representative of the coastal plain region of the mid-Atlantic United States. Discussion of the program is presented under the following section headings: goals and objectives; management and organization of DPEL; laboratory director; site manager; monitoring manager; research manager; and, organizational chart. The seven appendixes are entitled: detailed site description; supplemental land use plan; contract between Potomac Electric Power Company and Charles County Community Collge (CCCC); research and monitoring projects initiated at the Douglas Point Power Plant site; advisory committees; facilities and equipment; and CCCC personnel resumes

  4. Towards Incidence Management in 5G Based on Situational Awareness

    Directory of Open Access Journals (Sweden)

    Lorena Isabel Barona López

    2017-01-01

    Full Text Available The fifth generation mobile network, or 5G, moves towards bringing solutions to deploying faster networks, with hundreds of thousands of simultaneous connections and massive data transfer. For this purpose, several emerging technologies are implemented, resulting in virtualization and self-organization of most of their components, which raises important challenges related to safety. In order to contribute to their resolution, this paper proposes a novel architecture for incident management on 5G. The approach combines the conventional risk management schemes with the Endsley Situational Awareness model, thus improving effectiveness in different aspects, among them the ability to adapt to complex and dynamical monitoring environments, and countermeasure tracking or the role of context when decision-making. The proposal takes into account all layers for information processing in 5G mobile networks, ranging from infrastructure to the actuators responsible for deploying corrective measures.

  5. CONFLICT MANAGEMENT VIA SYSTEMICALLY PLANNED PEER MEDIATION

    OpenAIRE

    Evangelos C. Papakitsos; Konstantinos Karakiozis

    2016-01-01

    Conflicts and confrontations between students are a key-feature of school life. Especially in recent years, both the scientific and the educational community are particularly sensitive to bullying issues in the school context. Peer mediation (or school mediation) is an alternative way to manage conflicts at school. A critical evaluation of this practice is attempted, as well as its contribution to the formation of a positive attitude in school and to the decreasing of school-bullying incident...

  6. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  7. Incidence and Management of Bleeding Complications Following Percutaneous Radiologic Gastrostomy

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Nieun; Shin, Ji Hoon; Ko, Gi Young; Yoon, Hyun Ki; Gwon, Dong Il; Kim, Jin Hyoung; Sung, Kyu Bo [Asan Medical Center, Ulsan University College of Medicine, Seoul (Korea, Republic of)

    2012-03-15

    Upper gastrointestinal (GI) bleeding is a serious complication that sometimes occurs after percutaneous radiologic gastrostomy (PRG). We evaluated the incidence of bleeding complications after a PRG and its management including transcatheter arterial embolization (TAE). We retrospectively reviewed 574 patients who underwent PRG in our institution between 2000 and 2010. Eight patients (1.4%) had symptoms or signs of upper GI bleeding after PRG. The initial presentation was hematemesis (n = 3), melena (n = 2), hematochezia (n = 2) and bloody drainage through the gastrostomy tube (n = 1). The time interval between PRG placement and detection of bleeding ranged from immediately after to 3 days later (mean: 28 hours). The mean decrease in hemoglobin concentration was 3.69 g/dL (range, 0.9 to 6.8 g/dL). In three patients, bleeding was controlled by transfusion (n = 2) or compression of the gastrostomy site (n = 1). The remaining five patients underwent an angiography because bleeding could not be controlled by transfusion only. In one patient, the bleeding focus was not evident on angiography or endoscopy, and wedge resection including the tube insertion site was performed for hemostasis. The other four patients underwent prophylactic (n = 1) or therapeutic (n = 3) TAEs. In three patients, successful hemostasis was achieved by TAE, whereas the remaining one patient underwent exploration due to persistent bleeding despite TAE. We observed an incidence of upper GI bleeding complicating the PRG of 1.4%. TAE following conservative management appears to be safe and effective for hemostasis.

  8. 7 Mass casualty incidents: a review of triage severity planning assumptions.

    Science.gov (United States)

    Hunt, Paul

    2017-12-01

    Recent events involving a significant number of casualties have emphasised the importance of appropriate preparation for receiving hospitals, especially Emergency Departments, during the initial response phase of a major incident. Development of a mass casualty resilience and response framework in the Northern Trauma Network included a review of existing planning assumptions in order to ensure effective resource allocation, both in local receiving hospitals and system-wide.Existing planning assumptions regarding categorisation by triage level are generally stated as a ratio for P1:P2:P3 of 25%:25%:50% of the total number of injured survivors. This may significantly over-, or underestimate, the number in each level of severity in the case of a large-scale incident. A pilot literature review was conducted of the available evidence from historical incidents in order to gather data regarding the confirmed number of overall casualties, 'critical' cases, admitted cases, and non-urgent or discharged cases. This data was collated and grouped by mechanism in order to calculate an appropriate severity ratio for each incident type. 12 articles regarding mass casualty incidents from the last two decades were identified covering three main incident types: (1) Mass transportation crash, (2) Building fire, and (3) Bomb and related terrorist attacks and involving a total of 3615 injured casualties. The overall mortality rate was calculated as 12.3%. Table 1 summarises the available patient casualty data from each of the specific incidents reported and calculated proportions of critical ('P1'), admitted ('P2'), and non-urgent or ambulatory cases ('P3'). Despite the heterogeneity of data and range of incident type there is sufficient evidence to suggest that current planning assumptions are incorrect and a more refined model is required. An important finding is the variation in proportion of critical cases depending upon the mechanism. For example, a greater than expected proportion

  9. Water management planning guideline for waterpower

    International Nuclear Information System (INIS)

    2002-05-01

    Hydroelectric power has been used in Ontario for over 150 years, providing the impetus to economic development in the province. Currently, 83 hydroelectric utilities own the more than 200 hydro power facilities in Ontario, accounting for approximately 26 per cent of the total electrical generating capacity in the province. Flood control and the creation of recreational opportunities were added benefits derived from the construction of hydroelectric dams. The three ways of operating hydroelectric facilities are: run-of-the-river which involves minimal forebay storage, peaking which involves the operation of the dam for specific periods of high energy demand, and intermediate. The Ontario government plans to open the electricity market to competition, guided by four principles: (1) protecting consumers and offering more choice, (2) ensuring a strong business climate with a reliable supply of electricity, (3) protecting the environment, and (4) encouraging new ways of doing business and new sources of power. To address issues that arise from the operation of hydroelectric facilities, dam owners and hydroelectric facilities operators are required to develop Water Management Plans, outlining how the facility will be operated to balance environmental, social and economic objectives. The present document was developed to define goals and principles concerning planning, the scope of Water Management Plans, the criteria and the general planning process to be adopted for the preparation of the Plans. 1 tab., 4 figs

  10. Hanford emergency management plan - release 15

    Energy Technology Data Exchange (ETDEWEB)

    CARPENTER, G.A.

    1999-07-19

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety.

  11. The ANSTO waste management action plan

    International Nuclear Information System (INIS)

    Levins, D.

    1997-01-01

    ANSTO's Waste Management Action Plan is a five-year program which addresses legacy issues that have arisen from the accumulation of radioactive wastes at Lucas Heights over the last forty years. Following an extensive review of waste management practices, a detailed Action Plan was prepared involving seventeen projects in the areas of solid wastes, liquid wastes, control of effluents and emissions, spent reactor fuel and organisational issues. The first year of the Waste Management Action Plan has resulted in significant achievements, especially in the areas of improved storage of solid wastes, stabilisation of uranium scrap, commissioning and operation of a scanning system for low-level waste drums, treatment of intermediate-level liquid wastes and improvements in the methods for monitoring of spent fuel storage facilities. The main goal of the Waste Management Action Plan is to achieve consistency, by the year 2000, with best practice as identified in the Radioactive Waste Safety Standards and Guidelines currently under development by the IAEA

  12. A Course in Environmental Planning and Management.

    Science.gov (United States)

    Conacher, Arthur; And Others

    1993-01-01

    Describes a 13-week, third-year course in Environmental Planning and Management consisting of a mixture of lectures, seminars, workshop/laboratory sessions and field-based projects. Student objectives include awareness of the need for and complexities of environmental concerns; critiques of work done by environmental agencies and consultants; and…

  13. Hanford emergency management plan - release 15

    International Nuclear Information System (INIS)

    CARPENTER, G.A.

    1999-01-01

    The Hanford emergency management plan for the US Department of Energy Richland, WA and Office of River Protection. The program was developed in accordance with DOE Orders as well as Federal and State regulations to protect workers and public health and safety

  14. Outcomes Oriented Planning, Management, and Evaluation.

    Science.gov (United States)

    Kinnison, Charles J.

    An outcomes orientation is examined as the dominant focus for formulating improvements in a college's planning, management, and evaluation (PME) system. Outcomes are seen as individual (produced by college personnel or students), program related, or institutional. An outcomes orientation to PME has the advantages of relating to the quality of…

  15. Energy conservation: its planning and management

    International Nuclear Information System (INIS)

    Nanda, K.S.; Patra, K.C.

    1995-01-01

    Energy conservation, its planning and management and the development of renewable energy systems of proven design are very worthy challenges for all. Energy education at various levels is most important particularly in the development of renewable energy technology. 2 refs., 3 tabs

  16. Planning for and managing environmental restoration waste

    International Nuclear Information System (INIS)

    Miller, J.Q.

    1993-01-01

    This paper describes the approach used to support the management of environmental restoration (ER) waste. A general description is provided of the tools and techniques that have been developed and applied to produce waste generation forecast data and treatment, storage, and disposal capacity needs. The ER Program can now consistently manage ER waste streams from initial generation through ultimate disposal. Utilizing the valuable information that results from application of strategically planned systems and techniques demonstrates the ability to provide the necessary waste management support for the ER cleanup process

  17. Interim Hanford Waste Management Technology Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Interim Hanford Waste Management Technology Plan (HWMTP) is a companion document to the Interim Hanford Waste Management Plan (HWMP). A reference plan for management and disposal of all existing and certain projected future radioactive Hanford Site Defense Wastes (HSDW) is described and discussed in the HWMP. Implementation of the reference plan requires that various open technical issues be satisfactorily resolved. The principal purpose of the HWMTP is to present detailed descriptions of the technology which must be developed to close each of the technical issues associated with the reference plan identified in the HWMP. If alternative plans are followed, however, technology development efforts including costs and schedules must be changed accordingly. Technical issues addressed in the HWMTP and HWMP are those which relate to disposal of single-shell tank wastes, contaminated soil sites, solid waste burial sites, double-shell tank wastes, encapsulated 137 CsCl and 90 SrF 2 , stored and new solid transuranic (TRU) wastes, and miscellaneous wastes such as contaminated sodium metal. Among the high priority issues to be resolved are characterization of various wastes including early determination of the TRU content of future cladding removal wastes; completion of development of vitrification (Hanford Waste Vitrification Plant) and grout technology; control of subsidence in buried waste sites; and development of criteria and standards including performance assessments of systems proposed for disposal of HSDW. Estimates of the technology costs shown in this report are made on the basis that all identified tasks for all issues associated with the reference disposal plan must be performed. Elimination of, consolidation of, or reduction in the scope of individual tasks will, of course, be reflected in corresponding reduction of overall technology costs

  18. Lessons Learnt from the Improvement of Customer Support Processes: A Case Study on Incident Management

    Science.gov (United States)

    Jäntti, Marko

    IT Infrastructure Library (ITIL) is the most widely used IT service management framework that provides guidelines how to create, manage and support IT services. Service support processes, such as incident management and problem management, are among the first ITIL processes that organizations start to implement. However, several challenges may exist in the process implementation. The research question of this study is: which issues are important in establishing an ITIL-based incident management process? The main contribution of this paper is to present lessons learnt from an ITIL-based process improvement project that focused on establishing an incident management process in an IS department of a university hospital. Our results show that key issues in implementing incident management are to 1) define the basic concepts of incident management with concrete examples and 2) define process interfaces between incident management and other support processes.

  19. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  20. Management strategies in hospitals: scenario planning

    Directory of Open Access Journals (Sweden)

    Ghanem, Mohamed

    2015-06-01

    Full Text Available Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  1. NIF Operations Management Plan, August 2011

    Energy Technology Data Exchange (ETDEWEB)

    Van Wonterghem, Bruno M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States). National Ignition Facility (NIF)

    2014-01-30

    Lawrence Livermore National Laboratory’s (LLNL) National Ignition Facility (NIF) is a key component of the National Nuclear Security Administration’s (NNSA) Stockpile Stewardship Program, whose purpose is to maintain the safety, reliability, and effectiveness of our nation’s nuclear stockpile without underground nuclear testing. The NIF is crucial to the Stockpile Stewardship Program because it is the only facility that can create the conditions of extreme temperature and pressure—conditions that exist only in stars or in exploding nuclear weapons—that are relevant to understanding how our modern nuclear weapons operate. As such, the NIF’s primary mission is to attain fusion ignition in the laboratory. Fusion ignition not only supports Stockpile Stewardship needs, but also provides the basis for future decisions about fusion’s potential as a long-term energy source. Additionally, NIF provides scientists with access to high-energy-density regimes that can yield new insight and understanding in the areas of astrophysics, hydrodynamics, material properties, plasma physics, and radiative properties. The use of the NIF to support the Stockpile Stewardship Program and the advancement of basic high-energy-density science understanding is planned and managed through program-level execution plans and NIF directorate-level management teams. An example of a plan is the National Ignition Campaign Execution Plan. The NIF Operations Management Plan provides an overview of the NIF Operations organization and describes how the NIF is supported by the LLNL infrastructure and how it is safely and responsibly managed and operated. Detailed information on NIF management of the organization is found in a series of supporting plans, policies, and procedures. A list of related acronyms can be found in Appendix A of this document. The purpose of this document is to provide a roadmap of how the NIF Operations organization functions. It provides a guide to understanding the

  2. Nevada Test Site Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    The Nevada Test Site (NTS) Resource Management Plan (RMP) describes the NTS Stewardship Mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. The NTS Stewardship Mission is to manage the land and facilities at the NTS as a unique and valuable national resource. The RMP has defined goals for twelve resource areas based on the principles of ecosystem management. These goals were established using an interdisciplinary team of DOE/NV resource specialists with input from surrounding land managers, private parties, and representatives of Native American governments. The overall goal of the RMP is to facilitate improved NTS land use management decisions within the Great Basin and Mojave Desert ecoregions.

  3. Principal Experiences with Crisis Management Professional Development, Collaboration, and Implementation of the National Incident Management System Phases of Emergency Management

    Science.gov (United States)

    Naradko, Anthony M.

    2017-01-01

    The purpose of this qualitative single-subject case study was to identify the elements critical to crisis management professional development for school principals; the factors influencing the implementation of the National Incident Management System Phases of Emergency Management (2010) for principals; and the necessary elements for fostering…

  4. Strategic planning manager and management education in elementary education institutions

    Directory of Open Access Journals (Sweden)

    Kleeder José Bracho Pérez

    2013-10-01

    Full Text Available The purpose of this study was to determine the relationship between strategic planning and management of educational managers in primary schools of the parish municipality of Ricaurte Mara. The research was based on the theoretical bases of authors: Serna (2003, Chiavenato (2001, and Weihrich Koantz (2004, Pacheco, chestnut and Caicedo (2002 among others. The research was descriptive correlational design under a nonexperimental transactional field, the population consisted of 115 subjects between administrators and teachers, which the sample was taken and Tamayo Tamayo criterion; census. Data collection was conducted through two questionnaires (Brad for managers and (Brad for teachers each consisting of 42 items in Likert-type scale with four answer choices, which was validated by five experts and the reliability was calculated through Cronbach alpha coefficient was the result of which (0.95 for the questionnaire (Brad applied to directors and (0.90 for the questionnaire (Brad applied to teachers. The statistic used was descriptive using percentage tables. The results determined that the application of strategic planning by educational managers is low so there are weaknesses in management, we can say that there is a very high correlation (r = 0.89 between strategic planning and management of the educational manager in primary schools of the parish municipality of Ricaurte Mara. 

  5. Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase

    International Nuclear Information System (INIS)

    NSTec Environmental Restoration

    2007-01-01

    Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the NIMS

  6. Implementation of the National Incident Management System (NIMS)/Incident Command System (ICS) in the Federal Radiological Monitoring and Assessment Center(FRMAC) - Emergency Phase

    Energy Technology Data Exchange (ETDEWEB)

    NSTec Environmental Restoration

    2007-04-01

    Homeland Security Presidential Directive HSPD-5 requires all federal departments and agencies to adopt a National Incident Management System (NIMS)/Incident Command System (ICS) and use it in their individual domestic incident management and emergency prevention, preparedness, response, recovery, and mitigation programs and activities, as well as in support of those actions taken to assist state and local entities. This system provides a consistent nationwide template to enable federal, state, local, and tribal governments, private-sector, and nongovernmental organizations to work together effectively and efficiently to prepare for, prevent, respond to, and recover from domestic incidents, regardless of cause, size, or complexity, including acts of catastrophic terrorism. This document identifies the operational concepts of the Federal Radiological Monitoring and Assessment Center's (FRMAC) implementation of the NIMS/ICS response structure under the National Response Plan (NRP). The construct identified here defines the basic response template to be tailored to the incident-specific response requirements. FRMAC's mission to facilitate interagency environmental data management, monitoring, sampling, analysis, and assessment and link this information to the planning and decision staff clearly places the FRMAC in the Planning Section. FRMAC is not a mitigating resource for radiological contamination but is present to conduct radiological impact assessment for public dose avoidance. Field monitoring is a fact-finding mission to support this effort directly. Decisions based on the assessed data will drive public protection and operational requirements. This organizational structure under NIMS is focused by the mission responsibilities and interface requirements following the premise to provide emergency responders with a flexible yet standardized structure for incident response activities. The coordination responsibilities outlined in the NRP are based on the

  7. AVLIS Production Plant Project Management Plan

    International Nuclear Information System (INIS)

    1984-01-01

    The AVLIS Production Plant is designated as a Major System Acquisition (in accordance with DOE Order 4240.IC) to deploy Atomic Vapor Laser Isotope Separation (AVLIS) technology at the Oak Ridge, Tennessee site, in support of the US Uranium Enrichment Program. The AVLIS Production Plant Project will deploy AVLIS technology by performing the design, construction, and startup of a production plant that will meet capacity production requirements of the Uranium Enrichment Program. The AVLIS Production Plant Project Management Plan has been developed to outline plans, baselines, and control systems to be employed in managing the AVLIS Production Plant Project and to define the roles and responsibilities of project participants. Participants will develop and maintain detailed procedures for implementing the management and control systems in agreement with this plan. This baseline document defines the system that measures work performed and costs incurred. This plan was developed by the AVLIS Production Plant Project staff of Martin Marietta Energy Systems, Inc. and Lawrence Livermore National Laboratory in accordance with applicable DOE directives, orders and notices. 38 figures, 19 tables

  8. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1990-03-01

    The Nuclear Waste Policy Act of 1982 established the Office of Civilian Radioactive Waste Management (OCRWM) in the Department of Energy (DOE) to implement a program for the safe and permanent disposal of spent nuclear fuel and high-level radioactive waste. To achieve this objective, the OCRWM is developing an integrated waste-management system consisting of three elements: the transportation system, the monitored retrievable storage (MRS) facility, and the mined geologic disposal system (MGDS). The development of such a system requires management of many diverse disciplines that are involved in research, siting, design, licensing, and external interactions. The purpose of this Systems Engineering Management Plan (SEMP) is to prescribe how the systems-engineering process will be implemented in the development of the waste-management system. Systems engineering will be used by the OCRWM to manage, integrate, and document all aspects of the technical development of the waste-management system and its system elements to ensure that the requirements of the waste-management program are met. It will be applied to all technical activities of the OCRWM program. It will be used by the OCRWM to specify the sequence of technical activities necessary to define the requirements the waste-management system must satisfy, to develop the waste-management system, to relate system elements to each other, and to determine how the waste-management system can be optimized to most effectively satisfy the requirements. Furthermore, systems engineering will be used in the management of Program activities at the program, program-element, and project levels by specifying procedures, studies, reviews, and documentation requirements. 9 refs., 1 fig

  9. Environmental Restoration Project - Systems Engineering Management Plan

    International Nuclear Information System (INIS)

    Anderson, T.D.

    1998-06-01

    This Environmental Restoration (ER) Project Systems Engineering Management Plan (SEMP) describes relevant Environmental Restoration Contractor (ERC) management processes and shows how they implement systems engineering. The objective of this SEMP is to explain and demonstrate how systems engineering is being approached and implemented in the ER Project. The application of systems engineering appropriate to the general nature and scope of the project is summarized in Section 2.0. The basic ER Project management approach is described in Section 3.0. The interrelation and integration of project practices and systems engineering are outlined in Section 4.0. Integration with sitewide systems engineering under the Project Hanford Management Contract is described in Section 5.0

  10. Early Detection and Localization of Downhole Incidents in Managed Pressure Drilling

    DEFF Research Database (Denmark)

    Willersrud, Anders; Imsland, Lars; Blanke, Mogens

    2015-01-01

    Downhole incidents such as kick, lost circulation, pack-off, and hole cleaning issues are important contributors to downtime in drilling. In managed pressure drilling (MPD), operations margins are typically narrower, implying more frequent incidents and more severe consequences. Detection...

  11. Strategic plan for Hanford site information management

    International Nuclear Information System (INIS)

    1994-09-01

    The Hanford Site missions are to clean up the Site, to provide scientific knowledge and technology to meet global needs, and to partner in the economic diversification of the region. To achieve these long-term missions and increase confidence in the quality of the Site's decision making process, a dramatically different information management culture is required, consistent with US Department of Energy (DOE) mandates on increased safety, productivity, and openness at its sites. This plan presents a vision and six strategies that will move the Site toward an information management culture that will support the Site missions and address the mandates of DOE

  12. New Production Reactor project-management plan

    International Nuclear Information System (INIS)

    McCrosson, F.J.; Hibbard, L.; Buckner, M.R.

    1982-01-01

    This document provides a project management plan for the first phase of a project to design and build a new production reactor (NPR) at SRP. The design of the NPR is based upon proven SRP heavy water reactor design, with several enhancements such as full containment, moderator detritiation, improved cooling, and modernized control rooms and instrumentation. The first phase of the NPR project includes environmental and safety analyses, preparation of the technical data summary and basic data, site studies, engineering studies, and conceptual design. The project management plan was developed by a 14-member task force comprised of representatives from the Technical Division, the Manufacturing Division, the Departmental Engineer's Office, and the Engineering Department

  13. Fires in rooms containing electrical components - incident planning, fire fighting tactics, risks; Braender i driftrum - Insatsplaner, slaeckteknik, risker

    Energy Technology Data Exchange (ETDEWEB)

    Magnusson, Tommy; Ottosson, Jan; Lindskog, BertiI; Soederquist Bende, Evy; Eriksson, Fredrik; Haffling, Stefan

    2006-12-15

    Officer has according to Swedish law a right and an obligation to make a decision in the case of a fire and rescue operation in a nuclear power plant. Are this responsibility in conflict with the responsibility of the operating managers duties who is responsible for the safe operation of the plant according to the nuclear legislation. The opinion of SKI is that the Nuclear Plant Operator and the Fire Authority must act as a team and that there is no conflict between the laws. In-depth discussions has been started between the involved parties and the mutual consensus is that the question can be removed from the agenda. 2. A nuclear power plant is classified according to the Swedish law as a hazardous plant due to the risk of a nuclear incident followed by leakage of radioactivity. The interpretation of SKI is that a co-ordination between the authorities must take place. The mutual opinion between SKI, Fire Authorities and the operators of the Nuclear Power Plants is that the mutual objective for the areas of fire protection and planning and awareness of undesired events are as follows: The Fire Authorities require that the licensees perform safety analyses and presents the details the outcome of the analyses within for example the area of emergency readiness. The result should also include analyses performed to date. The licensee should detail what measures has been taken, for example for incident plans, emergency readiness, safety equipment etc, necessary with respect to the result of the analyses. The Fire Authority and SSI/SKI consults with each other about the results of the analyses and the measures taken by the operators and evaluate the accuracy of the results and if the measures taken are sufficient. General recommendations in order to choose the appropriate extinguishing media are presented in tables within the report. The recommendations are based on the risk for reactor safety, spread of radioactive contamination and property protection.

  14. Action Plan to Improve Customer Relationship Management

    OpenAIRE

    Laine, Antti

    2014-01-01

    This thesis concentrates on improving product recognisability and most critical Customer Relationship Management issues in the case company. The case company seeks to clarify the product recognizability and the customers’ knowledge of their product range in its whole diagnostic sector, and wanted to develop an action plan to improve them. To suggest improvements in these areas, this thesis investigates the current state of the product knowledge, and the customers’ opinions as for how ...

  15. Environmental development plan. LWR commercial waste management

    International Nuclear Information System (INIS)

    1980-08-01

    This Environmental Development Plan (EDP) identifies the planning and managerial requirements and schedules needed to evaluate and assess the environmental, health and safety (EH and S) aspects of the Commercial Waste Management Program (CWM). Environment is defined in its broadest sense to include environmental, health (occupational and public), safety, socioeconomic, legal and institutional aspects. This plan addresses certain present and potential Federal responsibilities for the storage, treatment, transfer and disposal of radioactive waste materials produced by the nuclear power industry. The handling and disposal of LWR spent fuel and processed high-level waste (in the event reprocessing occurs) are included in this plan. Defense waste management activities, which are addressed in detail in a separate EDP, are considered only to the extent that such activities are common to the commercial waste management program. This EDP addresses three principal elements associated with the disposal of radioactive waste materials from the commercial nuclear power industry, namely Terminal Isolation Research and Development, Spent Fuel Storage and Waste Treatment Technology. The major specific concerns and requirements addressed are assurance that (1) radioactivity will be contained during waste transport, interim storage or while the waste is considered as retrievable from a repository facility, (2) the interim storage facilities will adequately isolate the radioactive material from the biosphere, (3) the terminal isolation facility will isolate the wastes from the biosphere over a time period allowing the radioactivity to decay to innocuous levels, (4) the terminal isolation mode for the waste will abbreviate the need for surveillance and institutional control by future generations, and (5) the public will accept the basic waste management strategy and geographical sites when needed

  16. ATTENDING: Critiquing a Physician's Management Plan.

    Science.gov (United States)

    Miller, P L

    1983-05-01

    The ATTENDING system is designed to critique a physician's preoperative plan for anesthetic management. In undertaking to critique a physician's plan, ATTENDING differs from other medical decision making systems, which in effect attempt to tell a physician what to do. ATTENDING's approach may prove more acceptable clinically, and may avoid certain social, medical, and medicolegal drawbacks. To cri-tique a physician's plan, ATTENDING must confront three basic problems. 1) It must be able to explore flexibly all possible approaches for a patient's management. The formalism of an ``augmented decision network'' allows this. 2) It must be able to assess the relative risks and benefits of alternative approaches intelligently. A heuristic approach to risk analysis is outlined, based on three basic principles which are de-scribed in detail. 3) It must produce a potentially complex analysis which critiques the plan in focused, readable prose. This is facilitated by PROSENET, an approach which allows clean separation between the organization of the content of an analysis and its expression in English prose.

  17. River Protection Project (RPP) Project Management Plan

    International Nuclear Information System (INIS)

    NAVARRO, J.E.

    2001-01-01

    The Office of River Protection (ORP) Project Management Plan (PMP) for the River Protection Project (RPP) describes the process for developing and operating a Waste Treatment Complex (WTC) to clean up Hanford Site tank waste. The Plan describes the scope of the project, the institutional setting within which the project must be completed, and the management processes and structure planned for implementation. The Plan is written from the perspective of the ORP as the taxpayers' representative. The Hanford Site, in southeastern Washington State, has one of the largest concentrations of radioactive waste in the world, as a result of producing plutonium for national defense for more than 40 years. Approximately 53 million gallons of waste stored in 177 aging underground tanks represent major environmental, social, and political challenges for the U.S. Department of Energy (DOE). These challenges require numerous interfaces with state and federal environmental officials, Tribal Nations, stakeholders, Congress, and the US Department of Energy-Headquarters (DOE-HQ). The cleanup of the Site's tank waste is a national issue with the potential for environmental and economic impacts to the region and the nation

  18. Data management plans: the missing perspective.

    Science.gov (United States)

    Williams, Mary; Bagwell, Jacqueline; Nahm Zozus, Meredith

    2017-07-01

    The National Institutes of Health requires data sharing plans for projects with over five hundred thousand dollars in direct costs in a single year and has recently released a new guidance on rigor and reproducibility in grant applications. The National Science Foundation outright requires Data Management Plans (DMPs) as part of applications for funding. However, there is no general and definitive list of topics that should be covered in a DMP for a research project. We identified and reviewed DMP requirements from research funders. Forty-three DMP topics were identified. The review uncovered inconsistent requirements for written DMPs as well as high variability in required or suggested DMP topics among funder requirements. DMP requirements were found to emphasize post-publication data sharing rather than upstream activities that impact data quality, provide traceability or support reproducibility. With the emphasis equalized, the forty-three identified topics can aid Data Managers in systematically generating comprehensive DMPs that support research project planning and funding application evaluation as well as data management conduct and post-publication data sharing. Copyright © 2017. Published by Elsevier Inc.

  19. Field assessment of a model tuberculosis outbreak response plan for low-incidence areas

    Directory of Open Access Journals (Sweden)

    Pascopella Lisa

    2007-10-01

    Full Text Available Abstract Background For a regional project in four low-incidence states, we designed a customizable tuberculosis outbreak response plan. Prior to dissemination of the plan, a tuberculosis outbreak occurred, presenting an opportunity to perform a field assessment of the plan. The purpose of the assessment was to ensure that the plan included essential elements to help public health professionals recognize and respond to outbreaks. Methods We designed a semi-structured questionnaire and interviewed all key stakeholders involved in the response. We used common themes to assess validity of and identify gaps in the plan. A subset of participants provided structured feedback on the plan. Results We interviewed 11 public health and six community stakeholders. The assessment demonstrated that (1 almost all of the main response activities were reflected in the plan; (2 the plan added value by providing a definition of a tuberculosis outbreak and guidelines for communication and evaluation. These were areas that lacked written protocols during the actual outbreak response; and (3 basic education about tuberculosis and the interpretation and use of genotyping data were important needs. Stakeholders also suggested adding to the plan questions for evaluation and a section for specific steps to take when an outbreak is suspected. Conclusion An interactive field assessment of a programmatic tool revealed the value of a systematic outbreak response plan with a standard definition of a tuberculosis outbreak, guidelines for communication and evaluation, and response steps. The assessment highlighted the importance of education and training for tuberculosis in low-incidence areas.

  20. Management strategies in hospitals: scenario planning.

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a "Stakeholder Feedback". Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and "blind spots". This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management.

  1. Management strategies in hospitals: scenario planning

    Science.gov (United States)

    Ghanem, Mohamed; Schnoor, Jörg; Heyde, Christoph-Eckhard; Kuwatsch, Sandra; Bohn, Marco; Josten, Christoph

    2015-01-01

    Background: Instead of waiting for challenges to confront hospital management, doctors and managers should act in advance to optimize and sustain value-based health. This work highlights the importance of scenario planning in hospitals, proposes an elaborated definition of the stakeholders of a hospital and defines the influence factors to which hospitals are exposed to. Methodology: Based on literature analysis as well as on personal interviews with stakeholders we propose an elaborated definition of stakeholders and designed a questionnaire that integrated the following influence factors, which have relevant impact on hospital management: political/legal, economic, social, technological and environmental forces. These influence factors are examined to develop the so-called critical uncertainties. Thorough identification of uncertainties was based on a “Stakeholder Feedback”. Results: Two key uncertainties were identified and considered in this study: the development of workload for the medical staff the profit oriented performance of the medical staff. According to the developed scenarios, complementary education of the medical staff as well as of non-medical top executives and managers of hospitals was the recommended core strategy. Complementary scenario-specific strategic options should be considered whenever needed to optimize dealing with a specific future development of the health care environment. Conclusion: Strategic planning in hospitals is essential to ensure sustainable success. It considers multiple situations and integrates internal and external insights and perspectives in addition to identifying weak signals and “blind spots”. This flows into a sound planning for multiple strategic options. It is a state of the art tool that allows dealing with the increasing challenges facing hospital management. PMID:26504735

  2. OCRWM Systems Engineering Management Plan (SEMP)

    International Nuclear Information System (INIS)

    1994-06-01

    The Office of Civilian Radioactive Waste Management Systems Engineering Management Plan (OCRWM SEMP) specifies the technical management approach for the development of the waste management system, and specifies the approach for the development of each of the system elements -- the waste acceptance system, the transportation system, the Monitored Retrievable Storage (MRS) facility, and the mined geologic disposal system, which includes site characterization activity. The SEMP also delineates how systems engineering will be used by OCRWM to describe the system development process; it identifies responsibilities for its implementation, and specifies the minimum requirements for systems engineering. It also identifies the close interrelationship of system engineering and licensing processes. This SEMP, which is a combined OCRWM and M ampersand O SEMP, is part of the top-level program documentation and is prepared in accordance with the direction provided in the Program Management System Manual (PMSM). The relationship of this document to other top level documents in the CRWMS document hierarchy is defined in the PMSM. A systems engineering management plan for each project, which specifies the actions to be taken in implementing systems engineering at the project level, shall be prepared by the respective project managers. [''Program'' refers to the CRWMS-wide activity and ''project'' refers to that level responsible for accomplishing the specific activities of that segment of the program.] The requirements for the project level SEMPs are addressed in Section 4.2.2.2. They represent the minimum set of requirements, and do not preclude the broadening of systems engineering activities to meet the specific needs of each project

  3. Antipsychotic Drug-Induced Somnolence: Incidence, Mechanisms, and Management.

    Science.gov (United States)

    Fang, Fang; Sun, Hongwei; Wang, Zuowei; Ren, Ming; Calabrese, Joseph R; Gao, Keming

    2016-09-01

    Somnolence is a common side effect of antipsychotics. To assess the incidence of this side effect, we performed a MEDLINE search for randomized, double-blinded, placebo- or active-controlled studies of adult patients treated with antipsychotics for schizophrenia, mania, bipolar depression, or bipolar disorder. We extracted rates of somnolence from original publications and pooled them based on the dose of each antipsychotic in the same psychiatric condition, then estimated the absolute risk increase (ARI) and the number needed to harm (NNH) of an antipsychotic relative to placebo or an active comparator in the same psychiatric condition. According to the ARI in acute schizophrenia, bipolar mania, and bipolar depression, antipsychotics can be classified as high somnolence (clozapine), moderate somnolence (olanzapine, perphenazine, quetiapine, risperidone, ziprasidone), and low somnolence (aripiprazole, asenapine, haloperidol, lurasidone, paliperidone, cariprazine). The risk of somnolence with blonanserin, brexpiprazole, chlorpromazine, iloperidone, sertindole, and zotepine needs further investigation. The rates of somnolence were positively correlated to dose and duration for some antipsychotics, but not for others. Many factors, including antipsychotic per se, the method used to measure somnolence, patient population, study design, and dosing schedule, might affect the incidence of antipsychotic-induced somnolence. The mechanisms of antipsychotic-induced somnolence are likely multifactorial, although the blockade of histamine 1 receptors and α1 receptors may play a major role. The management of antipsychotic-induced somnolence should include sleep hygiene education, choosing an antipsychotic with a lower risk for somnolence, starting at a lower dose with a slower titration based on psychiatric diagnoses, adjusting doses when necessary, and minimizing concurrent somnolence-prone agents. Since most cases of somnolence were mild to moderate, allowing tolerance to

  4. STUDY OF INCIDENCE & MANAGEMENT OF PARA PHARYNGEAL TUMORS

    Directory of Open Access Journals (Sweden)

    Aruna Kumari

    2015-11-01

    Full Text Available INTRODUCTION: Parapharyngeal tumors are rare, comprising approximately 0.5% of all head and neck tumours. Most of them are benign. These tumors present with difficulties in diagnosis - complementary MRI and CT scanning are necessary for diagnosis, and Fine Needle Aspiration Cytology (FNAC is very specific in the histological diagnosis of these tumours. Open biopsy is not advisable due to bleeding, breaching of the capsule and seeding of the tumor. These tumors presents a challenge to the surgeon due to its anatomical complexities. This study deals with the incidence and management of various parapharyngeal tumors. OBJECTIVE OF THE STUDY: This study deals with the incidence of various tumors in the parapharyngeal space in different age and sex groups, role of sophisticated diagnostic modalities like CT, MRI, MR Angio. Colour Doppler along with FNAC and various surgical approaches to this space. This study also deals with intra-operative and post operative complications. In this series, a total of 25 cases has been studied retrospectively in a time period of 2 years from 2012 to 2014, presenting in our ENT and Head and Neck Dept., Gandhi hospital. RESULTS: According to this study, there is male preponderance (52% and highest incidence is seen in 3rd and 5th decade (24% each. Most common presenting symptoms are difficulty in swallowing (36% and swelling either intraoral or in the neck (28%. Least common symptoms being cranial nerve palsy (4%, difficulty in breathing/noisy breathing (4%, nasal regurgitation (4% and hard of hearing (8%. FNAC was done in 21 cases, in which 13 were correlating with the biopsy report. CT scan was required in all cases. MR Angiography was done in 4 cases and colour Doppler in 2 cases. Surgery is the mainstay of the treatment. Most common tumor in PPS is neurogenic (schwannoma/neurofibroma.i.e 44%. Next commonly occurring tumor in our study is of salivary origin-pleomorphic adenoma (24%, paragangliomas (12%. Other less

  5. Developing an incident management system to support Ebola response -- Liberia, July-August 2014.

    Science.gov (United States)

    Pillai, Satish K; Nyenswah, Tolbert; Rouse, Edward; Arwady, M Allison; Forrester, Joseph D; Hunter, Jennifer C; Matanock, Almea; Ayscue, Patrick; Monroe, Benjamin; Schafer, Ilana J; Poblano, Luis; Neatherlin, John; Montgomery, Joel M; De Cock, Kevin M

    2014-10-17

    The ongoing Ebola virus disease (Ebola) outbreak in West Africa is the largest and most sustained Ebola epidemic recorded, with 6,574 cases. Among the five affected countries of West Africa (Liberia, Sierra Leone, Guinea, Nigeria, and Senegal), Liberia has had the highest number cases (3,458). This epidemic has severely strained the public health and health care infrastructure of Liberia, has resulted in restrictions in civil liberties, and has disrupted international travel. As part of the initial response, the Liberian Ministry of Health and Social Welfare (MOHSW) developed a national task force and technical expert committee to oversee the management of the Ebola-related activities. During the third week of July 2014, CDC deployed a team of epidemiologists, data management specialists, emergency management specialists, and health communicators to assist MOHSW in its response to the growing Ebola epidemic. One aspect of CDC's response was to work with MOHSW in instituting incident management system (IMS) principles to enhance the organization of the response. This report describes MOHSW's Ebola response structure as of mid-July, the plans made during the initial assessment of the response structure, the implementation of interventions aimed at improving the system, and plans for further development of the response structure for the Ebola epidemic in Liberia.

  6. Role of strategic planning in engineering management

    Science.gov (United States)

    Krishen, Kumar

    1993-01-01

    Today, more than ever before, engineers are faced with uncertain and sometimes chaotic environments in which to function. The traditional roles of an engineer to design, develop, and streamline a manufacturing process for a product are still valued and relevant. However, the need for an engineer to participate in the process of identifying the product to be developed, the schedule and resources required, and the goal of satisfying the customer, has become paramount to achieving the success of the enterprise. When we include these endeavors in the functions of an engineer, management of 'engineering' takes on a new dimension. In this paper, the ramifications of the changing and increased functions of an engineer and consequent impacts on engineering management are explored. The basic principles which should be invoked in order to embrace the new environment for engineering management are outlined. The ultimate finding of this study is that the enterprise strategic plan should be developed in such a way as to allow engineering management to encompass the full spectrum of the responsibilities of engineers. A consequence of this is that the fundamental elements of the strategic process can best be implemented through a project team or group approach. The paper thus concentrates on three areas: evolving environment, strategic plan, and ways to achieve enterprise success.

  7. Site systems engineering: Systems engineering management plan

    Energy Technology Data Exchange (ETDEWEB)

    Grygiel, M.L. [Westinghouse Hanford Co., Richland, WA (United States)

    1996-05-03

    The Site Systems Engineering Management Plan (SEMP) is the Westinghouse Hanford Company (WHC) implementation document for the Hanford Site Systems Engineering Policy, (RLPD 430.1) and Systems Engineering Criteria Document and Implementing Directive, (RLID 430.1). These documents define the US Department of Energy (DOE), Richland Operations Office (RL) processes and products to be used at Hanford to implement the systems engineering process at the site level. This SEMP describes the products being provided by the site systems engineering activity in fiscal year (FY) 1996 and the associated schedule. It also includes the procedural approach being taken by the site level systems engineering activity in the development of these products and the intended uses for the products in the integrated planning process in response to the DOE policy and implementing directives. The scope of the systems engineering process is to define a set of activities and products to be used at the site level during FY 1996 or until the successful Project Hanford Management Contractor (PHMC) is onsite as a result of contract award from Request For Proposal DE-RP06-96RL13200. Following installation of the new contractor, a long-term set of systems engineering procedures and products will be defined for management of the Hanford Project. The extent to which each project applies the systems engineering process and the specific tools used are determined by the project`s management.

  8. Quality Management Plan for the Environmental Assessment and Innovation Division

    Science.gov (United States)

    Quality management plan (QMP) which identifies the mission, roles, responsibilities of personnel with regard to quality assurance and quality management for the environmental assessment and innovation division.

  9. Guide to Developing an Environmental Management System - Plan

    Science.gov (United States)

    This page takes you though the basic steps (Plan, Do, Check, Act) of building an Environmental Management System (EMS) as they are outlined in the 2001 Second Edition of Environmental Management Systems: An Implementation Guide. Plan section.

  10. NYC CV Pilot Deployment : Safety Management Plan : New York City.

    Science.gov (United States)

    2016-04-22

    This safety management plan identifies preliminary safety hazards associated with the New York City Connected Vehicle Pilot Deployment project. Each of the hazards is rated, and a plan for managing the risks through detailed design and deployment is ...

  11. National Ignition Facility Site Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, V.

    1997-09-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1{degree}C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  12. National Ignition Facility Site Management Plan

    International Nuclear Information System (INIS)

    Roberts, V.

    1997-01-01

    The purpose of the NIF Site Management Plan is to describe the roles, responsibilities, and interfaces for the major NIF Project organizations involved in construction of the facility, installation and acceptance testing of special equipment, and the NIF activation. The plan also describes the resolution of priorities and conflicts. The period covered is from Critical Decision 3 (CD3) through the completion of the Project. The plan is to be applied in a stepped manner. The steps are dependent on different elements of the project being passed from the Conventional Facilities (CF) Construction Manager (CM), to the Special Equipment (SE) CMs, and finally to the Activation/ Start-Up (AS) CM. These steps are defined as follows: The site will be coordinated by CF through Project Milestone 310, end of conventional construction. The site is defined as the fenced area surrounding the facility and the CF laydown and storage areas. The building utilities that are installed by CF will be coordinated by CF through the completion of Project Milestone 310, end of conventional construction. The building utilities are defined as electricity, compressed air, de-ionized water, etc. Upon completion of the CF work, the Optics Assembly Building/Laser and Target Area Building (OAB/LTAB) will be fully operational. At that time, an Inertial Confinement Fusion (ICF) Program building coordinator will become responsible for utilities and site activities. * Step 1. Mid-commissioning (temperature stable, +1 degree C) of an area (e.g., Laser Bay 2, OAB) will precipitate the turnover of that area (within the four walls) from CF to SE. * Step 2. Interior to the turned-over space, SE will manage all interactions, including those necessary by CF. * Step 3. As the SE acceptance testing procedures (ATPS) are completed, AS will take over the management of the area and coordinate all interactions necessary by CF and SE. For each step, the corresponding CMs for CF, SE, or AS will be placed in charge of

  13. Integrated Resource Planning for Urban Waste Management

    Directory of Open Access Journals (Sweden)

    Damien Giurco

    2015-01-01

    Full Text Available The waste hierarchy currently dominates waste management planning in Australia. It is effective in helping planners consider options from waste avoidance or “reduction” through to providing infrastructure for landfill or other “disposal”. However, it is inadequate for guiding context-specific decisions regarding sustainable waste management and resource recovery, including the ability for stakeholders to compare a range of options on an equal footing whilst considering their various sustainability impacts and trade-offs. This paper outlines the potential use of Integrated Resource Planning (IRP as a decision-making approach for the urban waste sector, illustrated using an Australian case study. IRP is well established in both the water and energy sectors in Australia and internationally. It has been used in long-term planning enabling decision-makers to consider the potential to reduce resource use through efficiency alongside options for new infrastructure. Its use in the waste sector could address a number of the current limitations experienced by providing a broader context-sensitive, adaptive, and stakeholder focused approach to planning not present in the waste hierarchy and commonly used cost benefit analysis. For both efficiency and new infrastructure options IRP could be useful in assisting governments to make decisions that are consistent with agreed objectives while addressing costs of alternative options and uncertainty regarding their environmental and social impacts. This paper highlights various international waste planning approaches, differences between the sectors where IRP has been used and gives a worked example of how IRP could be applied in the Australian urban waste sector.

  14. Enterprise Resource Planning, Operations and Management

    DEFF Research Database (Denmark)

    Hald, Kim Sundtoft; Mouritsen, Jan

    2013-01-01

    Purpose – This research aims to explore the enabling and constraining effects of enterprise resource planning (ERP) systems and speculate on how these can be linked to the four generic roles of operations management (OM) proposed by Slack et al. Design/methodology/approach – This research...... are linked conceptually. Based on the identified effects of ERP, the paper speculates on the managerial tasks of the production and operations manager (POM) in an ERP environment and lists a set of central concerns of potential relevance to POM and to future research. Research limitations...... for practicing POMs in managing the implementation and design of ERP to support the different domains of OM. Originality/value – Current studies of the effects of ERP and their link to the practice of OM tend to focus on one or a few roles of the emerging system. Such studies do not properly take into account...

  15. Hanford site ground water protection management plan

    International Nuclear Information System (INIS)

    1994-10-01

    Ground water protection at the Hanford Site consists of preventative and remedial measures that are implemented in compliance with a variety of environmental regulations at local, state, and federal levels. These measures seek to ensure that the resource can sustain a broad range of beneficial uses. To effectively coordinate and ensure compliance with applicable regulations, the U.S. Department of Energy has issued DOE Order 5400.1 (DOE 1988a). This order requires all U.S. Department of Energy facilities to prepare separate ground water protection program descriptions and plans. This document describes the Ground Water Protection Management Plan (GPMP) for the Hanford Site located in the state of Washington. DOE Order 5400.1 specifies that the GPMP covers the following general topical areas: (1) documentation of the ground water regime; (2) design and implementation of a ground water monitoring program to support resource management and comply with applicable laws and regulations; (3) a management program for ground water protection and remediation; (4) a summary and identification of areas that may be contaminated with hazardous waste; (5) strategies for controlling hazardous waste sources; (6) a remedial action program; and (7) decontamination, decommissioning, and related remedial action requirements. Many of the above elements are currently covered by existing programs at the Hanford Site; thus, one of the primary purposes of this document is to provide a framework for coordination of existing ground water protection activities. The GPMP provides the ground water protection policy and strategies for ground water protection/management at the Hanford Site, as well as an implementation plan to improve coordination of site ground water activities

  16. Acceptability and perceived utility of drone technology among emergency medical service responders and incident commanders for mass casualty incident management.

    Science.gov (United States)

    Hart, Alexander; Chai, Peter R; Griswold, Matthew K; Lai, Jeffrey T; Boyer, Edward W; Broach, John

    2017-01-01

    This study seeks to understand the acceptability and perceived utility of unmanned aerial vehicle (UAV) technology to Mass Casualty Incidents (MCI) scene management. Qualitative questionnaires regarding the ease of operation, perceived usefulness, and training time to operate UAVs were administered to Emergency Medical Technicians (n = 15). A Single Urban New England Academic Tertiary Care Medical Center. Front-line emergency medical service (EMS) providers and senior EMS personnel in Incident Commander roles. Data from this pilot study indicate that EMS responders are accepting to deploying and operating UAV technology in a disaster scenario. Additionally, they perceived UAV technology as easy to adopt yet impactful in improving MCI scene management.

  17. 40 CFR 35.2102 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... Administrator shall first determine that the project is: (a) Included in any water quality management plan being implemented for the area under section 208 of the Act or will be included in any water quality management plan...

  18. 40 CFR 60.55c - Waste management plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Waste management plan. 60.55c Section... Waste Incinerators for Which Construction is Commenced After June 20, 1996 § 60.55c Waste management plan. The owner or operator of an affected facility shall prepare a waste management plan. The waste...

  19. 33 CFR 151.57 - Waste management plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 2 2010-07-01 2010-07-01 false Waste management plans. 151.57... Treaty as it Pertains to Pollution from Ships Garbage Pollution and Sewage § 151.57 Waste management... follows the plan. (c) Each waste management plan under paragraph (b) of this section must be in writing...

  20. Adaptive Management Planning Projects as Conflict Resolution Processes

    OpenAIRE

    Greg Walkerden

    2006-01-01

    Adaptive management planning projects use multiparty, multidisciplinary workshops and simulation modeling to facilitate dialogue, negotiation, and planning. However, they have been criticized as a poor medium for conflict resolution. Alternative processes from the conflict resolution tradition, e.g., principled negotiation and sequenced negotiation, address uncertainty and biophysical constraints much less skillfully than does adaptive management. When we evaluate adaptive management planning...

  1. 33 CFR 385.24 - Project Management Plans.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  2. Terrestrial forest management plan for Palmyra Atoll

    Science.gov (United States)

    Hathaway, Stacie A.; McEachern, Kathryn; Fisher, Robert N.

    2011-01-01

    This 'Terrestrial Forest Management Plan for Palmyra Atoll' was developed by the U.S. Geological Survey (USGS) for The Nature Conservancy (TNC) Palmyra Program to refine and expand goals and objectives developed through the Conservation Action Plan process. It is one in a series of adaptive management plans designed to achieve TNC's mission toward the protection and enhancement of native wildlife and habitat. The 'Terrestrial Forest Management Plan for Palmyra Atoll' focuses on ecosystem integrity and specifically identifies and addresses issues related to assessing the status and distribution of resources, as well as the pressures acting upon them, most specifically nonnative and potentially invasive species. The plan, which presents strategies for increasing ecosystem integrity, provides a framework to implement and track the progress of conservation and restoration goals related to terrestrial resources on Palmyra Atoll. The report in its present form is intended to be an overview of what is known about historical and current forest resources; it is not an exhaustive review of all available literature relevant to forest management but an attempt to assemble as much information specific to Palmyra Atoll as possible. Palmyra Atoll is one of the Northern Line Islands in the Pacific Ocean southwest of the Hawai`ian Islands. It consists of many heavily vegetated islets arranged in a horseshoe pattern around four lagoons and surrounded by a coral reef. The terrestrial ecosystem consists of three primary native vegetation types: Pisonia grandis forest, coastal strand forest, and grassland. Among these vegetation types, the health and extent of Pisonia grandis forest is of particular concern. Overall, the three vegetation types support 25 native plant species (two of which may be extirpated), 14 species of sea birds, six shore birds, at least one native reptile, at least seven native insects, and six native land crabs. Green and hawksbill turtles forage at Palmyra Atoll

  3. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are...

  4. Prostate Cancer in Transgender Women: Incidence, Etiopathogenesis, and Management Challenges.

    Science.gov (United States)

    Deebel, Nicholas A; Morin, Jacqueline P; Autorino, Riccardo; Vince, Randy; Grob, Baruch; Hampton, Lance J

    2017-12-01

    To critically analyze the available evidence regarding the incidence, etiopathogenesis, and management of prostate cancer (CaP) in transgender women. In addition, this article aims to present a recent case report of a transgender woman with a unique presentation at the author's institution. An electronic nonsystematic literature search was performed to identify pertinent studies. PubMed search engine was queried by using the following search terms: "prostate cancer," "male to female transsexual," "transgender patient," "androgen + prostate cancer," "estrogen therapy + prostate cancer," and "health care barrier." In addition, a clinical case managed at our institution was reviewed and critically discussed. Including our case, there have been only 10 documented cases of CaP in transgender women. Additionally, an emerging body of literature has questioned the role of androgens in the development of CaP and suggested that estrogen therapy may not be as protective as initially thought. Therefore, the current evidence suggests that the transgender woman should be screened for CaP the same as a nontransgender men. Barriers to care in the transgender female population include accessing resources, medical knowledge deficits, ethics of transition-related medical care, diagnosing vs pathologizing transgender patients, financial restrictions of the patient, and health system determinants. Although rare, CaP in transgender women has been documented. Both the mechanism and the impact of receiving a bilateral orchiectomy on disease development are unclear. Future study is needed to examine these factors, and to further shape the treatment and screening regimen for these patients. Published by Elsevier Inc.

  5. Policies for managing emergency medical services in mass casualty incidents.

    Science.gov (United States)

    Adini, B; Bodas, M; Nilsson, H; Peleg, K

    2017-09-01

    Diverse decision-making is needed in managing mass casualty incidents (MCIs), by emergency medical services (EMS). The aim of the study was to review consensus among international experts concerning policies of EMS management during MCIs. Applicability of 21 EMS policies was tested through a 2-cycle modified e-Delphi process, in which 38 multi-disciplinary experts from 10 countries participated. Threshold for approving proposed solutions was defined as consensus of >80%. Policies that did not achieve the targeted consensus were reviewed to detect variability according to respondents' origin country. 16 policies were endorsed in the first cycle including collaboration between ambulance service providers; implementing a unified mode of operation; preparing criteria for ground versus aerial evacuation; and, developing support systems for caregivers exposed to violence. An additional policy which proposed that senior EMS officers should not necessarily act as on-site MCI commanders was endorsed in the second cycle. Demographic breakdown of views concerning non-consensual policies revealed differences according to countries of origin. Assigning ambulances to off-duty team members was highly endorsed by experts from Israel and South Africa and strongly rejected by European respondents. Avoiding entry to risk areas until declared safe was endorsed by European, Asian and Oceanic experts, but rejected by Israeli, South African and North American experts. Despite uniqueness of countries and EMS agencies, solutions to most dilemmas were applicable to all organizations, regardless of location or affiliation. Cultural diversity was found concerning readiness to implement military-civilian collaboration in MCIs and a rigid separation between work-leisure responsibilities. Copyright © 2017 Elsevier Ltd. All rights reserved.

  6. FY 2017 Stockpile Stewardship and Management Plan - Biennial Plan Summary

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2016-03-01

    This year’s summary report updates the Fiscal Year 2016 Stockpile Stewardship and Management Plan (FY 2016 SSMP), the 25-year strategic program of record that captures the plans developed across numerous NNSA programs and organizations to maintain and modernize the scientific tools, capabilities, and infrastructure necessary to ensure the success of NNSA’s nuclear weapons mission. The SSMP is a companion to the Prevent, Counter, and Respond: A Strategic Plan to Reduce Global Nuclear Threats (FY 2017-2021) report, the planning document for NNSA’s nuclear threat reduction mission. New versions of both reports are published each year in response to new requirements and challenges. Much was accomplished in FY 2015 as part of the program of record described in this year’s SSMP. The science-based Stockpile Stewardship Program allowed the Secretaries of Energy and Defense to certify for the twentieth time that the stockpile remains safe, secure, and effective without the need for underground nuclear explosive testing. The talented scientists, engineers, and technicians at the three national security laboratories, the four nuclear weapons production plants, and the national security site are primarily responsible for this continued success. Research, development, test, and evaluation programs have advanced NNSA’s understanding of weapons physics, component aging, and material properties through first-of-a-kind shock physics experiments, along with numerous other critical experiments conducted throughout the nuclear security enterprise. The multiple life extension programs (LEPs) that are under way made progress toward their first production unit dates. The W76-1 LEP is past the halfway point in total production, and the B61-12 completed three development flight tests. Critical to this success is the budget. The Administration’s budget request for NNSA’s Weapons Activities has increased for all but one of the past seven years, resulting in a total increase of

  7. Enhanced Chemical Incident Response Plan (ECIRP). Appendix F, remediation analysis with Decision Support Tools (DSTs) for wide-area chemical hazards.

    Energy Technology Data Exchange (ETDEWEB)

    Hassig, Nancy L. (Pacific Northwest National Laboratory, Richland, WA); Pulsipher, Brent A. (Pacific Northwest National Laboratory, Richland, WA); Foltz, Greg W.; Hoette, Trisha Marie

    2011-07-01

    The Defense Threat Reduction Agency (DTRA) commissioned an assessment of the Consequence Management (CM) plans in place on military bases for response to a chemical attack. The effectiveness of the CM plans for recovering from chemical incidents was modeled using a multiple Decision Support Tools (DSTs). First, a scenario was developed based on an aerial dispersion of a chemical agent over a wide-area of land. The extent of contamination was modeled with the Hazard Prediction and Assessment Capability (HPAC) tool. Subsequently, the Analyzer for Wide Area Restoration Effectiveness (AWARE) tool was used to estimate the cost and time demands for remediation based on input of contamination maps, sampling and decontamination resources, strategies, rates and costs. The sampling strategies incorporated in the calculation were designed using the Visual Sample Plan (VSP) tool. Based on a gaps assessment and the DST remediation analysis, an Enhanced Chemical Incident Response Plan (ECIRP) was developed.

  8. Analysis of eighty-four commercial aviation incidents - Implications for a resource management approach to crew training

    Science.gov (United States)

    Murphy, M. R.

    1980-01-01

    A resource management approach to aircrew performance is defined and utilized in structuring an analysis of 84 exemplary incidents from the NASA Aviation Safety Reporting System. The distribution of enabling and associated (evolutionary) and recovery factors between and within five analytic categories suggests that resource management training be concentrated on: (1) interpersonal communications, with air traffic control information of major concern; (2) task management, mainly setting priorities and appropriately allocating tasks under varying workload levels; and (3) planning, coordination, and decisionmaking concerned with preventing and recovering from potentially unsafe situations in certain aircraft maneuvers.

  9. Strategic and tactiocal planning for managing national park resources

    Science.gov (United States)

    Daniel L. Schmoldt; David L. Peterson

    2001-01-01

    Each National Park Service unit in the United States produces a resource management plan (RMP) every four years or less. These plans constitute a strategic agenda for a park. Later, tactical plans commit budgets and personnel to specific projects over the planning horizon. Yet, neither planning stage incorporates much quantitative and analytical rigor and is devoid of...

  10. Plan of environmental management, Metro (railway)

    International Nuclear Information System (INIS)

    Jaramillo Perez, Jorge A.

    1996-01-01

    The present article, tries to rescue and to put to the readers' consideration some of the most excellent aspects in the Plan of Environmental management of the Metro - PMAM. This study was carried out by a multidisciplinary group, in its majority professors of the Antioquia university, and summoned by the Center of Environmental Investigations of the Ability of Engineering. It is convenient to remember that in a Plan of Environmental management - PMA settles down the actions that are required to prevent, to mitigate, to control, to compensate and to correct the possible negative environmental impacts and potential the positive ones caused by the execution or operation of a project, it works or activity. A PMA also includes the pursuit plans, evaluation, monitored and contingency, and it is the result of the Study of Environmental Impact - EIA. It is of scoring that the EIA that possesses the METRO, on which it is supposed this PMA would consolidate, one carries out responding to conditions that, 10 years later, they were surpassed by the expectations of the time, and in some cases its considerations don't satisfy the current demands; however neither it is exactly to evaluate now, when there is a perception different from the reality, those conclusions that it tried to predict derived future events of the construction and the operation of the Metropolitan Train in their moment. Therefore, this studies it tries to rescue those recommendations that still have validity and it tries to contribute, starting from an interdisciplinary encounter some recommendations, translated to programs, projects and actions that guide the Management for the taking of decisions in the terminal phase and the Commercial Operation of the METRO, toward the future

  11. SEA of river basin management plans

    DEFF Research Database (Denmark)

    Larsen, Sanne Vammen; Kørnøv, Lone

    2009-01-01

    In, 2000 the European Parliament and the European Council passed the Water Framework Directive (WFD) to be implemented in all Member States. The consequence of the directive is that river basin management plans (RBMPs) shall be prepared which are legally subject to a strategic environmental...... assessment (SEA). An important environmental factor for the water sector is climate change, especially the changes it causes to the water environment. However, based on an argument of an inadequate knowledge base regarding climate change impacts, the prospect of Danish authorities including climate change...

  12. Mixed Waste Focus Area program management plan

    International Nuclear Information System (INIS)

    Beitel, G.A.

    1996-10-01

    This plan describes the program management principles and functions to be implemented in the Mixed Waste Focus Area (MWFA). The mission of the MWFA is to provide acceptable technologies that enable implementation of mixed waste treatment systems developed in partnership with end-users, stakeholders, tribal governments and regulators. The MWFA will develop, demonstrate and deliver implementable technologies for treatment of mixed waste within the DOE Complex. Treatment refers to all post waste-generation activities including sampling and analysis, characterization, storage, processing, packaging, transportation and disposal

  13. 300 Area Revitalization Project Management Plan

    International Nuclear Information System (INIS)

    Downey, H. D.

    1999-01-01

    The 300 Area Revitalization Team has been tasked with the responsibility to develop an integrated path forward for the 300 Area, as part of a commitment stemming from the 300 Area Disposition Workshop that was held on March 17, 1998. The integrated path forward that is needed must ensure that budget, schedule, and work scopes are complementary between the Programs that are involved in the 300Area. This Project Management Plan (PMP) defines the roles and responsibilities, and the overall approach, to development of a prioritized schedule for 300 Area activities that will achieve the end-state condition

  14. Management practices associated with the incidence rate of clinical mastitis.

    Science.gov (United States)

    Barkema, H W; Schukken, Y H; Lam, T J; Beiboer, M L; Benedictus, G; Brand, A

    1999-08-01

    Risk factors for the incidence rate of clinical mastitis were studied in 274 Dutch dairy herds. Variables that were associated with resistance to disease were the feeding, housing, and milking machine factors. Variables that were associated with exposure were grazing, combined housing of dry cows and heifers, and calving area hygiene. Postmilking teat disinfection in herds with a low bulk milk somatic cell count and years of practicing dry cow therapy were positively associated with the incidence rate of clinical mastitis. Herds with a low bulk milk somatic cell count and in which postmilking teat disinfection was not used had lower incidence rates of clinical mastitis than did other herds. The incidence rate of clinical mastitis caused by Escherichia coli was mostly related to housing conditions, hygiene, and machine milking. The incidence rate of clinical mastitis caused by Staphylococcus aureus was mostly related to factors associated with bulk milk somatic cell count and factors that might be due to cause and effect reversal. A strong positive correlation existed between the incidence rate of clinical mastitis caused by Streptococcus dysgalactiae and the incidence rate of clinical mastitis caused by Staph. aureus. The incidence rate of clinical mastitis caused by Streptococcus dysgalactiae was related to nutrition, milking technique, and machine milking. The incidence rate of clinical mastitis caused by Streptococcus uberis was associated with factors related to housing, nutrition, and machine milking.

  15. 18 CFR 740.4 - State water management planning program.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false State water management... STATE WATER MANAGEMENT PLANNING PROGRAM § 740.4 State water management planning program. (a) A State... major elements of the State water management program, which should address but not be limited to: (i...

  16. 25 CFR 163.11 - Forest management planning and sustained yield management.

    Science.gov (United States)

    2010-04-01

    ... Secretary will be applied, with a definite plan of silvicultural management, analysis of the short term and... 25 Indians 1 2010-04-01 2010-04-01 false Forest management planning and sustained yield management... GENERAL FORESTRY REGULATIONS Forest Management and Operations § 163.11 Forest management planning and...

  17. Incidence, diagnosis and management of eye affections in dogs ...

    African Journals Online (AJOL)

    A retrospective study of ocular affections in dogs was conducted at some selected clinics and hospitals in Southwest Nigeria between 2003 and, 2013 to determine the incidence, pattern of distribution, methods of diagnosis and treatment modalities using descriptive statistical tool. Overall incidence of eye affection in dogs ...

  18. How to Manage and Plan Terminology: Creating Management TDBs

    Directory of Open Access Journals (Sweden)

    Gordana Jakić

    2016-09-01

    Full Text Available Scientific and technical terminology represents a very topical issue in economically and technologically dependent countries with small languages such as Serbian. The current terminological problems in the Serbian language, especially in specialized areas that are experiencing dynamic development, are: Anglicization of the language for special purposes, underdeveloped and unstable terminology, and lack of adequate and modern terminological and lexical resources. On the one hand, the terminological problems listed above are of concern to subject-field specialists, since inadequate and non-existent terminology significantly affects the representation, transfer and management of specialized knowledge and information. On the other hand, terminology and language planners point to the growing need for immediate and systematic intervention aimed at terminology harmonization, consolidation and standardization. In spite of the awareness, there is no systematic approach to the solving of terminological problems in Serbian. In addition, practical activities regarding the collection and organization of terminology are few and reduced to individual initiatives. Under the paradigm of language planning (LP-oriented terminology management (2, this paper is going to address a practical activity of terminology management: the creation of a Serbian management terminology database (TDB with equivalent terms in English. The paper will discuss the methodology of terminology work, potential obstacles in termbase creation, as well as potential benefits that such a resource would have on all its potential users: management specialists and practitioners, professional translators, and language and terminology planners. A particular focus will be placed on the potential significance that this kind of a database would have for terminology policy and planning in the Serbian language, on the one hand, and knowledge transfer and management, on the other hand.

  19. Major incident medical management and support the practical approach at the scene

    CERN Document Server

    Advanced Life Support Group

    2012-01-01

    Major Incident Medical Management and Support (MIMMS) is the coursebook for the Advanced Life Support Group's internationally taught training for health care professionals responding to major incidents. The practical approach employed in MIMMS has proved an invaluable aid to both civilian and military doctors, nurses and paramedics working in disaster management worldwide.

  20. Use of Plan-Do-Study-Act cycles to decrease incidence of neonatal hypothermia in the labor room.

    Science.gov (United States)

    Shaw, Subhash Chandra; Devgan, Amit; Anila, Sushila; Anushree, Neha; Debnath, Himadri

    2018-04-01

    Body temperature of a neonate continues to be under-documented, under-recognized, and under-managed, even though studies have shown that neonatal hypothermia increases mortality and morbidity. We aimed to reduce neonatal hypothermia (body temperature improvement (QI) initiative using the rapid-cycle Plan-Do-Study-Act approach (PDSA) improvement model and the project was conducted from 15 Jan 2017 to 25 Feb 2017. All singleton neonates with gestational ages above 34 completed weeks born by vaginal delivery were targeted. Exclusion criteria included neonates needing any form of resuscitation, those developing respiratory distress after birth needing any form of respiratory support or observation in NICU. We ran PDSA cycles (including pre-warmed cloths, skin to skin care with mother, early breast feeding, delaying weight check by 1 h and checklist of planned steps), every week, after taking the baseline data in the first week. A total of 46 neonates were studied. After 4 PDSA cycles, incidence of neonatal hypothermia at 1 h of birth dropped to zero from 50% at baseline and we were able to sustain 100% normal temperature (36.5-37.5 °C) since then. This QI project has significantly reduced the incidence of hypothermia in term and late preterm neonates born by vaginal delivery in our institute.

  1. Tenneessee Valley Authority office of nuclear power management development plan

    International Nuclear Information System (INIS)

    Clements, L.L.

    1985-01-01

    The Tennessee Valley Authority's Management Development Plan is discussed and consists of an analysis of each managerial position, an analysis of each individual manager's and potential manager's qualifications and training and a comparison of the two. From this comparison two products are derived: a management replacement plan and an individual development plan for each nuclear employee. The process of the program is described in detail

  2. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  3. Principles of effective USA federal fire management plans

    Science.gov (United States)

    Meyer, Marc D.; Roberts, Susan L.; Wills, Robin; Brooks, Matthew L.; Winford, Eric M.

    2015-01-01

    Federal fire management plans are essential implementation guides for the management of wildland fire on federal lands. Recent changes in federal fire policy implementation guidance and fire science information suggest the need for substantial changes in federal fire management plans of the United States. Federal land management agencies are also undergoing land management planning efforts that will initiate revision of fire management plans across the country. Using the southern Sierra Nevada as a case study, we briefly describe the underlying framework of fire management plans, assess their consistency with guiding principles based on current science information and federal policy guidance, and provide recommendations for the development of future fire management plans. Based on our review, we recommend that future fire management plans be: (1) consistent and compatible, (2) collaborative, (3) clear and comprehensive, (4) spatially and temporally scalable, (5) informed by the best available science, and (6) flexible and adaptive. In addition, we identify and describe several strategic guides or “tools” that can enhance these core principles and benefit future fire management plans in the following areas: planning and prioritization, science integration, climate change adaptation, partnerships, monitoring, education and communication, and applied fire management. These principles and tools are essential to successfully realize fire management goals and objectives in a rapidly changing world.

  4. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Julie Braun Williams

    2013-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at Idaho National Laboratory in southeastern Idaho. The Idaho National Laboratory is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable, bear valuable physical and intangible legacies, and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through regular reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of appendices

  5. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2011-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  6. Idaho National Laboratory Cultural Resource Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Lowrey, Diana Lee

    2009-02-01

    As a federal agency, the U.S. Department of Energy has been directed by Congress, the U.S. president, and the American public to provide leadership in the preservation of prehistoric, historic, and other cultural resources on the lands it administers. This mandate to preserve cultural resources in a spirit of stewardship for the future is outlined in various federal preservation laws, regulations, and guidelines such as the National Historic Preservation Act, the Archaeological Resources Protection Act, and the National Environmental Policy Act. The purpose of this Cultural Resource Management Plan is to describe how the Department of Energy, Idaho Operations Office will meet these responsibilities at the Idaho National Laboratory. This Laboratory, which is located in southeastern Idaho, is home to a wide variety of important cultural resources representing at least 13,500 years of human occupation in the southeastern Idaho area. These resources are nonrenewable; bear valuable physical and intangible legacies; and yield important information about the past, present, and perhaps the future. There are special challenges associated with balancing the preservation of these sites with the management and ongoing operation of an active scientific laboratory. The Department of Energy, Idaho Operations Office is committed to a cultural resource management program that accepts these challenges in a manner reflecting both the spirit and intent of the legislative mandates. This document is designed for multiple uses and is intended to be flexible and responsive to future changes in law or mission. Document flexibility and responsiveness will be assured through annual reviews and as-needed updates. Document content includes summaries of Laboratory cultural resource philosophy and overall Department of Energy policy; brief contextual overviews of Laboratory missions, environment, and cultural history; and an overview of cultural resource management practices. A series of

  7. RESPONSE PROTOCOL TOOLBOX: PLANNING FOR AND RESPONDING TO DRINKING WATER CONTAMINATION THREATS AND INCIDENTS. MODULE 1: WATER UTILITIES PLANNING GUIDE - INTERIM FINAL - DECEMBER 2003

    Science.gov (United States)

    The interim final Response Protocol Toolbox: Planning for and Responding to Contamination Threats to Drinking Water Systems is designed to help the water sector effectively and appropriately respond to intentional contamination threats and incidents. It was produced by EPA, buil...

  8. Fresno/Clovis water management plan

    International Nuclear Information System (INIS)

    Burmeister, W.E.; Peterson, D.

    1993-01-01

    The Fresno/Clovis Metropolitan Area (FCMA) has historically relied solely on untreated undisinfected groundwater as a source of potable water to serve its 500,000 people. Contamination was discovered in some wells in the late 1970s, and cones of depression in areas of heavy pumping have caused contaminants to spread within the basin. Recent data indicate that at least 44 of the 352 public water agency wells in the FCMA have already been deactivated because of groundwater quality degradation. Major plumes of groundwater contamination occur throughout the study area. Most of the agricultural contaminants in the FCMA groundwater are the consequence of routine pesticide application over thousands of acres of surrounding farmland. Commercial and industrial contaminants are primarily due to poor storage and handling practices, careless or improper disposal, and leaking underground tanks. Recent and anticipated water quality regulations will probably require some form of wellhead treatment at every public water agency well in the FCMA. Such treatment may consist of disinfection, corrosion control, and the removal of radionuclides and organic chemicals. Many of the well sites are not sized, located, or configured to accommodate wellhead treatment. Potable water distribution systems in the FCMA were constructed based on dispersed wells and a local distribution network of relatively small water mains. A technical advisory committee (TAC) was formed in 1984 to promote a cooperative water planning effort. The TAC is composed of the five major water agencies in the metropolitan area: the Cities of Fresno and Clovis, Fresno County, the Fresno Metropolitan Flood Control District (FMFCD), and the Fresno Irrigation District (FID). The TAC prepared the work plan and, in August of 1991, selected CH2M HILL to develop the Fresno/Clovis Water Resources Management Plan

  9. 77 FR 38267 - Information Collection; Request for Comment; Objections to New Land Management Plans, Plan...

    Science.gov (United States)

    2012-06-27

    ... DEPARTMENT OF AGRICULTURE Forest Service Information Collection; Request for Comment; Objections to New Land Management Plans, Plan Amendments, and Plan Revisions AGENCY: Forest Service, USDA..., Ecosystem Management Coordination, at 202-205-0895 or email to: [email protected] . Individuals who use...

  10. The flood risk management plan: towards spatial water governance

    NARCIS (Netherlands)

    Hartmann, T.; Driessen, P.

    2017-01-01

    The flood risk management plan challenges both water engineers and spatial planners. It calls for a new mode of governance for flood risk management. This contribution analyses how this mode of governance distinguishes from prevalent approaches. Spatial planning and water management in Europe are

  11. Walk the talk: leaders' enacted priority of safety, incident reporting, and error management.

    Science.gov (United States)

    Van Dyck, Cathy; Dimitrova, Nicoletta G; de Korne, Dirk F; Hiddema, Frans

    2013-01-01

    The main goal of the current research was to investigate whether and how leaders in health care organizations can stimulate incident reporting and error management by "walking the safety talk" (enacted priority of safety). Open interviews (N = 26) and a cross-sectional questionnaire (N = 183) were conducted at the Rotterdam Eye Hospital (REH) in The Netherlands. As hypothesized, leaders' enacted priority of safety was positively related to incident reporting and error management, and the relation between leaders' enacted priority of safety and error management was mediated by incident reporting. The interviews yielded rich data on (near) incidents, the leaders' role in (non)reporting, and error management, grounding quantitative findings in concrete case descriptions. We support previous theorizing by providing empirical evidence showing that (1) enacted priority of safety has a stronger relationship with incident reporting than espoused priority of safety and (2) the previously implied positive link between incident reporting and error management indeed exists. Moreover, our findings extend our understanding of behavioral integrity for safety and the mechanisms through which it operates in medical settings. Our findings indicate that for the promotion of incident reporting and error management, active reinforcement of priority of safety by leaders is crucial. Social sciences researchers, health care researchers and health care practitioners can utilize the findings of the current paper in order to help leaders create health care systems characterized by higher incident reporting and more constructive error handling.

  12. Connected Vehicle Pilot Deployment Program Phase 2, Data Management Plan

    Science.gov (United States)

    2017-10-17

    This document represents a data management plan that delineates all of the data types and data treatment throughout the New York City Connected Vehicle Pilot Deployment (NYC CVPD). This plan includes an identification of the New York City connected v...

  13. Kirtland's Warbler Wildlife Management Area Comprehensive Conservation Plan

    Data.gov (United States)

    Department of the Interior — The Comprehensive Conservation Plan (CCP) for Kirtland’s Warbler Wildlife Management Area (WMA) was signed on September 10, 2009, completing a planning process that...

  14. FY 2014 - Stockpile and Stewardship and Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-06-01

    This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.

  15. Tank Waste Remediation System Characterization Project Programmatic Risk Management Plan

    International Nuclear Information System (INIS)

    Baide, D.G.; Webster, T.L.

    1995-12-01

    The TWRS Characterization Project has developed a process and plan in order to identify, manage and control the risks associated with tank waste characterization activities. The result of implementing this process is a defined list of programmatic risks (i.e. a risk management list) that are used by the Project as management tool. This concept of risk management process is a commonly used systems engineering approach which is being applied to all TWRS program and project elements. The Characterization Project risk management plan and list are subset of the overall TWRS risk management plan and list

  16. Technical Assistance Contractor management plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project.

  17. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-01-01

    This document provides a management tool for evaluating and designing the appropriate elements of a field sampling program. This document provides discussion of the elements of a program and is to be used as a guidance document during the preparation of project and/or function specific documentation. This document does not specify how a sampling program shall be organized. The HSQMP is to be used as a companion document to the Hanford Analytical Services Quality Assurance Plan (HASQAP) DOE/RL-94-55. The generation of this document was enhanced by conducting baseline evaluations of current sampling organizations. Valuable input was received from members of field and Quality Assurance organizations. The HSQMP is expected to be a living document. Revisions will be made as regulations and or Hanford Site conditions warrant changes in the best management practices. Appendices included are: summary of the sampling and analysis work flow process, a user's guide to the Data Quality Objective process, and a self-assessment checklist

  18. Technical Assistance Contractor management plan. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) as the prime contractor and three teaming partner subcontractors: Roy F. Weston, Inc. (RFW), AGRA Earth and Environmental, Inc. (AGRA), and Geraghty and Miller, Inc. (G and M). The TAC contract's scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both Surface and Ground Water Projects. The TAC team supports the DOE in completing surface remedial action and initiating ground water remediation work for start-up, characterization, compliance planning, design, construction oversight, and remedial operations. The TAC provides the DOE UMTRA Project Team with a dedicated management, scientific, and technical resource base in Albuquerque, New Mexico, which is supplemented by corporate resources. A carefully developed and maintained staff of technical experts is available to assess, analyze, develop, and execute cost-effective solutions to the demanding technical and institutional problems presented by the UMTRA Project

  19. LAND MANAGEMENT REGULATION AS AN INSTRUMENT FOR PLANNING IN UKRAINE

    OpenAIRE

    O. Dorosh; R. Buriak; I. Kupriyanchyk

    2017-01-01

    The presence of problems in the territorial management of land indicates that the system of state and municipal management does not meet the modern requirements of sustainable (balanced) development. The explanation is simple - if the planning of the development of territories of settlements takes place on the basis of approved urban planning documentation (master plans), then the territory of land tenure and land use outside their borders is notfully covered by development of land management...

  20. Planning and management of logistic cycle

    Directory of Open Access Journals (Sweden)

    V. N. Kudashkin

    2017-01-01

    Full Text Available We are considering planning and managing of logistic cycle, its impact on the content of the main processes that comprise the cycle to implement the order for the supply of material resources for industrial consumption, as well as its practical use, effectiveness, and prospects.This research paper is made on the basis of the information, received from textbooks and scientific literature of domestic and foreign authors, as well as from other sources. The main methods, used in this work are as follows: method of system analysis, method of the theory of operations’ research, prognostics. Application of these methods allows forecasting material flows, creating the integrated management systems and controlling their movements, developing systems of logistic service, to optimize supply stock and solve a number of other tasks.A logistic approach to form a modern system of logistics will save time, reduce costs for the purchase of material resources, their delivery and storage.In modern conditions of the market economy, the considered time parameters of the logistic chain are essential for manufacturing enterprises because their records significantly increase the efficiency of the logistical system.Logistics is equipped with a special complex of economic and mathematical models, the main feature of which is the adaptability, i.e. ability to solve complex optimization problems in the operational mode and in the process of the management of material flows. The primary role of these models in a market economy is to identify quickly points of compromise.Dynamics to functional cycles gives the necessity to align resource needs «input» and «output». «Input» functional cycle is an order that specifies requirements for a product or service. Logistical system, which is able to complete fully the order of any size, as a rule, needs in the «combined» functional cycles, including different transactions and operations at different stages. The «output» of

  1. Resource management plan for the Oak Ridge Reservation. Volume 27, Wildlife Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Parr, P.D. [Oak Ridge National Lab., TN (United States); Evans, J.W. [Tennessee Wildlife Resources Agency, Knoxville, TN (United States)

    1992-06-01

    A plan for management of the wildlife resources on the US Department of Energy`s Oak Ridge Reservation is outlined in this document. Management includes wildlife population control (hunts, trapping, and removal), handling specific problems with wildlife, restoration of species, coordination with researchers on wildlife studies, preservation and management of habitats, and law enforcement. Wildlife resources are divided into five categories, each with a specific set of objectives and procedures for obtaining these objectives. These categories are (1) species-richness management to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) featured species management to produce selected species in desired numbers on designated land units; (3) management of game species for research, education, recreation, and public safety, (4) endangered species management designed to preserve and protect both the species and habitats critical to the survival of those species; and (5) pest management. Achievement of the objectives is a joint effort between the Tennessee Wildlife Resources Agency and the Oak Ridge National Laboratory`s Environmental Sciences Division.

  2. Tank waste remediation system programmatic risk management plan

    International Nuclear Information System (INIS)

    Seaver, D.A.

    1995-01-01

    This risk management plan defines the approach to be taken to managing risks in the Tank Waste Remediation System (TWRS) program. It defines the actions to be taken at the overall program level, and the risk management requirements for lower-level projects and other activities. The primary focus of this plan is on ''programmatic'' risks, i.e., risks with respect to the cost, schedule, and technical performance of the program. The plan defines an approach providing managers with the flexibility to manage risks according to their specific needs, yet creates. The consistency needed for effectiveness across the program. The basic risk management approach uses a risk management list for the program, each project, and additional lower-level activities. The risk management list will be regularly reviewed and updated by appropriate level of management. Each list defines key risks, their likelihood and consequences, risk management actions to be taken, responsible individuals, and other management information

  3. Incidence and management of life-threatening adverse events during cardiac catheterization for congenital heart disease.

    Science.gov (United States)

    Lin, C Huie; Hegde, Sanjeet; Marshall, Audrey C; Porras, Diego; Gauvreau, Kimberlee; Balzer, David T; Beekman, Robert H; Torres, Alejandro; Vincent, Julie A; Moore, John W; Holzer, Ralf; Armsby, Laurie; Bergersen, Lisa

    2014-01-01

    Continued advancements in congenital cardiac catheterization and interventions have resulted in increased patient and procedural complexity. Anticipation of life-threatening events and required rescue measures is a critical component to preprocedural preparation. We sought to determine the incidence and nature of life-threatening adverse events in congenital and pediatric cardiac catheterization, risk factors, and resources necessary to anticipate and manage events. Data from 8905 cases performed at the 8 participating institutions of the Congenital Cardiac Catheterization Project on Outcomes were captured between 2007 and 2010 [median 1,095/site (range 133-3,802)]. The incidence of all life-threatening events was 2.1 % [95 % confidence interval (CI) 1.8-2.4 %], whereas mortality was 0.28 % (95 % CI 0.18-0.41 %). Fifty-seven life-threatening events required cardiopulmonary resuscitation, whereas 9 % required extracorporeal membrane oxygenation. Use of a risk adjustment model showed that age events. Using this model, standardized life-threatening event ratios were calculated, thus showing that one institution had a life-threatening event rate greater than expected. Congenital cardiac catheterization and intervention can be performed safely with a low rate of life-threatening events and mortality; preprocedural evaluation of risk may optimize preparation of emergency rescue and bailout procedures. Risk predictors (age < 1, hemodynamic vulnerability, and procedure risk category) can enhance preprocedural patient risk stratification and planning.

  4. Acute Appendicitis: Incidence and Management in Nigeria | Alatise ...

    African Journals Online (AJOL)

    Appendicitis is the leading cause of surgical emergency admission in most hospital in Nigeria. It accounts for about 15-40% of all emergency surgery done in most centers in the country. All age groups can develop the disease including the fetus in utero, but the incidence is higher in the second and third decade of life.

  5. The Critical Incident Technique in Library and Information Management Research.

    Science.gov (United States)

    Fisher, Shelagh; Oulton, Tony

    1999-01-01

    Focuses on the application of the Critical Incident Technique (CIT) in three studies at the Department of Information and Communications, Manchester Metropolitan University, United Kingdom. Examines staff-development needs as a key element in change in higher education; decision-making practices in small- to medium-size libraries; and development…

  6. Incidence, Pattern and Management of Ovarian Cancer at a Tertiary ...

    African Journals Online (AJOL)

    Department of Obstetrics and Gynecology, University of Nigeria Teaching Hospital, Ituku‑Ozalla 1Department of. Histopathology, University of ... ovarian cancer giving an incidence rate of 1/405 gynecological admissions per year or 0.3% (95% .... not found in the records. Follow up of patients was by clinical examination and.

  7. Health professional's role in disaster planning: a strategic management approach.

    Science.gov (United States)

    Meyer, M U; Graeter, C J

    1995-05-01

    1. The Strategic Management for Total Quality in Health Care model incorporates strategic management methods and total quality principles to enhance management of complex, interdisciplinary projects. 2. The purpose of disaster planning is to provide an effective and efficient plan to prevent personal injury and limit property damage and capital losses, as well as return to full production after a disaster. 3. Participation in disaster response planning provides health professionals with an opportunity to demonstrate the benefits they can provide for meeting their company's business needs. 4. Disaster planning is a complex, interdisciplinary project that requires a strategic management framework to facilitate development of high quality, cost effective programs.

  8. Project planning and project management of Baseball II-T

    International Nuclear Information System (INIS)

    Kozman, T.A.; Chargin, A.K.

    1975-01-01

    The details of the project planning and project management work done on the Baseball II-T experiment are reviewed. The LLL Baseball program is a plasma confinement experiment accomplished with a superconducting magnet in the shape of a baseball seam. Both project planning and project management made use of the Critical Path Management (CPM) computer code. The computer code, input, and results from the project planning and project management runs, and the cost and effectiveness of this method of systems planning are discussed

  9. Revisiting a programmatic planning approach: managing linkages between transport and land use planning

    NARCIS (Netherlands)

    Busscher, Tim; Tillema, Taede; Arts, Eric

    2013-01-01

    The body of knowledge on transport and land use planning shows considerable overlap with management theories and practices. Notable examples can be found in project management and strategic management. Recently, in the field of management theory, the idea of programme management has gained

  10. Tribal Decisions-Makers Guide to Solid Waste Management: Chapter 2 - Developing Solid Waste Management Plans

    Science.gov (United States)

    Solid waste management plans offer a host of benefits for tribes and Alaskan Native villages. Through the preparation of these plans, you can assess your cur-rent and future waste management needs, set priorities, and allocate resources accordingly.

  11. An empirical machine learning method for predicting potential fire control locations for pre-fire planning and operational fire management

    Science.gov (United States)

    Christopher D. O' Connor; David E. Calkin; Matthew P. Thompson

    2017-01-01

    During active fire incidents, decisions regarding where and how to safely and effectively deploy resources to meet management objectives are often made under rapidly evolving conditions, with limited time to assess management strategies or for development of backup plans if initial efforts prove unsuccessful. Under all but the most extreme fire weather conditions,...

  12. River Basin Management Plans - Institutional framework and planning process

    DEFF Research Database (Denmark)

    Frederiksen, Pia; Nielsen, Helle Ørsted; Pedersen, Anders Branth

    2011-01-01

    The report it a deliverable to the Waterpraxis project, based on research carried out in WP3. It is based on country reports from analyses of water planning in one river basin district in each of the countries Sweden, Finland, Latvia, Lithuania, Poland, Germany and Denmark, and it compares...... the institutional set-up, the public participation and the potentials and barriers for implementing the water plans....

  13. Guidelines for developing transportation management plans in Virginia.

    Science.gov (United States)

    2005-01-01

    A transportation management plan (TMP) is a comprehensive program of traffic control, communication, operation, and demand management strategies designed to maintain acceptable levels of traffic flow in work zones. A systematic procedure and/or check...

  14. AMADEUS Project Deliverable 1.2: Data Management Plan

    OpenAIRE

    Ana Belén Cristobal

    2018-01-01

    This document describes the initial Data Management Plan (DMP) for AMADEUS project. It addresses Project administration data collected as part of the execution and management of a disruptive research that could be in the market in the incoming years.

  15. Planned special events : cost management and cost recovery

    Science.gov (United States)

    2009-05-01

    This purpose of this primer is to aid jurisdictions and agencies, especially Departments of Transportation, with identifying and managing the costs of planned special events (PSEs) and forming policy for cost recovery. Cost management the effectiv...

  16. Cost accounting, management control, and planning in health care.

    Science.gov (United States)

    Siegrist, R B; Blish, C S

    1988-02-01

    Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)

  17. Link between traditional planning and energy management

    Energy Technology Data Exchange (ETDEWEB)

    Schweitzer, M.

    1981-01-01

    In simple terms, community energy planning is the process of envisioning a desired future state of energy supply and consumption for a local area and designing the appropriate measures to implement that future. While energy planning can be distinguished from other specialized concerns, such as housng or transportation planning, there are also major similarities which bind all these elements together. These similarities and differences are discussed. Community-level energy planning represents a natural extension of the comprehensive planning process. As the comprehensive plan has grown in the past to reflect new subjects of public concern such as environmental quality and economic development, so it can evolve further to address society's growing interest in energy use. Because the general purpose, process, and implementation devices associated with energy planning tie it closely with the comprehensive planning process as currently practiced, incorporating energy issues into the comprehensive plan should be a relatively simple matter.

  18. Wilderness management through voluntary behavior change: an evaluation of the Pemigewasset Wilderness Management Plan

    Science.gov (United States)

    John M. Halstead; Cindy M. Brown; Albert E. Luloff; Bruce E. Lindsay

    1992-01-01

    The management plan for the Pemigewasset Wilderness Area of New Hampshire represents a departure from traditional plans. Results of this study indicate limited evidence of the Pemigewasset Wilderness Management Plan (PWMP), as currently implemented, having a large direct impact on diverting hikers from their planned destinations and promoting dispersed usage and low...

  19. Early Detection and Localization of Downhole Incidents in Managed Pressure Drilling

    DEFF Research Database (Denmark)

    Willersrud, Anders; Imsland, Lars; Blanke, Mogens

    2015-01-01

    Downhole incidents such as kick, lost circulation, pack-off, and hole cleaning issues are important contributors to downtime in drilling. In managed pressure drilling (MPD), operations margins are typically narrower, implying more frequent incidents and more severe consequences. Detection and han...

  20. Using the Critical Incident Technique for Triangulation and Elaboration of Communication Management Competencies

    Science.gov (United States)

    Brunton, Margaret Ann; Jeffrey, Lynn Maud

    2010-01-01

    This paper presents the findings from research using the critical incident technique to identify the use of key competencies for communication management practitioners. Qualitative data was generated from 202 critical incidents reported by 710 respondents. We also present a brief summary of the quantitative data, which identified two superordinate…

  1. Chloropicrin Fumigant Management Plan Phase 2 Templates

    Science.gov (United States)

    These forms provide a framework for detailing the FMP elements of pesticide products containing the active ingredient chloropicrin, including application block, buffer zones, emergency response plan, tarp plan, soil conditions, and air monitoring.

  2. Dazomet Fumigant Management Plan Phase 2 Templates

    Science.gov (United States)

    These templates provide a framework for reporting application block information, buffer zones, emergency response plan, tarp plan, soil conditions, air monitoring, and more for pesticide products containing the active ingredient dazomet, such as Basamid G.

  3. IX Disposition Project - project management plan

    International Nuclear Information System (INIS)

    Choi, I.G.

    1994-01-01

    This report presents plans for resolving saving and disposal concerns for ion exchange modules, cartridge filters and columns. This plan also documents the project baselines for schedules, cost, and technical information

  4. Program Planning Concepts in Solid Waste Management

    Science.gov (United States)

    Brown, Sanford M., Jr.

    1972-01-01

    Presents a brief review of the program planning process, and uses the example of a solid waste program to illustrate what has or has not been accomplished through the use of the planning process. (LK)

  5. Simulation analysis of route diversion strategies for freeway incident management : final report.

    Science.gov (United States)

    1995-02-01

    The purpose of this project was to investigate whether simulation models could : be used as decision aids for defining traffic diversion strategies for effective : incident management. A methodology was developed for using such a model to : determine...

  6. Kaloko-Honokohau National Historical Park Air Tour Management Plan planning and NEPA scoping document

    Science.gov (United States)

    2004-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kaloko-Honokohau Historic Park pursuant to the National Parks Air Tour Management ...

  7. Kalaupapa National Historic Park Air Tour Management Plan planning and NEPA scoping study

    Science.gov (United States)

    2005-03-03

    The Federal Aviation Administration (FAA), in cooperation with the National Park Service (NPS), has initiated the development of an Air Tour Management Plan (ATMP) for Kalaupapa Historic Park pursuant to the National Parks Air Tour Management Act of ...

  8. Space-time variability of citrus leprosis as strategic planning for crop management.

    Science.gov (United States)

    Andrade, Daniel J; Lorençon, José R; Siqueira, Diego S; Novelli, Valdenice M; Bassanezi, Renato B

    2018-01-31

    Citrus leprosis is the most important viral disease of citrus. Knowledge of its spatiotemporal structure is fundamental to a representative sampling plan focused on the disease control approach. Such a well-crafted sampling design helps to reduce pesticide use in agriculture to control pests and diseases. Despite the use of acaricides to control citrus leprosis vector (Brevipalpus spp.) populations, the disease has spread rapidly through experimental areas. Citrus leprosis has an aggregate spatial distribution, with high dependence among symptomatic plants. Temporal variation in disease incidence increased among symptomatic plants by 4% per month. Use of acaricides alone to control the vector of leprosis is insufficient to avoid its incidence in healthy plants. Preliminary investigation into the time and space variation in the incidence of the disease is fundamental to select a sampling plan and determine effective strategies for disease management. © 2018 Society of Chemical Industry. © 2018 Society of Chemical Industry.

  9. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Science.gov (United States)

    2011-09-22

    ... Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY... the Criteria for Developing Refuge Water Management Plans (Refuge Criteria). Several entities have each developed a Refuge Water Management Plan (Refuge Plan), which Reclamation has evaluated and...

  10. Risk management plans as a tool for proactive pharmacovigilance

    DEFF Research Database (Denmark)

    Vermeer, N S; Duijnhoven, R G; Straus, S M J M

    2014-01-01

    Risk Management Plans (RMPs) have become a cornerstone in the pharmacovigilance of new drugs in Europe. The RMP was introduced in 2005 to support a proactive approach in gaining knowledge on safety concerns through early planning of pharmacovigilance activities. However, the rate at which...... of uncertainties, suggests that opportunities for optimization exist while ensuring feasible and risk-proportionate pharmacovigilance planning....

  11. The Marketing Plan: An Integrative Device for Teaching Marketing Management.

    Science.gov (United States)

    Berdine, W. R.; Petersen, James C.

    1980-01-01

    The importance of the marketing plan is stressed as an integrative device for teaching marketing management, and a structure is presented to assist students in designing a marketing plan. Components of this plan include marketing objectives, targeting market and buying motives, external environment and competition, product, price, and promotion.…

  12. 40 CFR 35.2023 - Water quality management planning.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Water quality management planning. 35... to the States to carry out water quality management planning including but not limited to: (1... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2023 Water quality...

  13. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in managing the implementation of its development plans. Using questionnaires and ...

  14. 14 CFR 136.39 - Air tour management plans (ATMP).

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Air tour management plans (ATMP). 136.39... management plans (ATMP). (a) Establishment. The Administrator, in cooperation with the Director, shall... of decision. (d) Procedure. In establishing an ATMP for a national park or tribal lands, the...

  15. Care planning for aggression management in a specialist secure mental health service: An audit of user involvement.

    Science.gov (United States)

    Hallett, Nutmeg; Huber, Jörg W; Sixsmith, Judith; Dickens, Geoffrey L

    2016-12-01

    This paper describes an audit of prevention and management of violence and aggression care plans and incident reporting forms which aimed to: (i) report the compliance rate of completion of care plans; (ii) identify the extent to which patients contribute to and agree with their care plan; (iii) describe de-escalation methods documented in care plans; and (iv) ascertain the extent to which the de-escalation methods described in the care plan are recorded as having been attempted in the event of an incident. Care plans and incident report forms were examined for all patients in men's and women's mental health care pathways who were involved in aggressive incidents between May and October 2012. In total, 539 incidents were examined, involving 147 patients and 121 care plans. There was no care plan in place at the time of 151 incidents giving a compliance rate of 72%. It was documented that 40% of patients had contributed to their care plans. Thematic analysis of de-escalation methods documented in the care plans revealed five de-escalation themes: staff interventions, interactions, space/quiet, activities and patient strategies/skills. A sixth category, coercive strategies, was also documented. Evidence of adherence to de-escalation elements of the care plan was documented in 58% of incidents. The reasons for the low compliance rate and very low documentation of patient involvement need further investigation. The inclusion of coercive strategies within de-escalation documentation suggests that some staff fundamentally misunderstand de-escalation. © 2016 Australian College of Mental Health Nurses Inc.

  16. The 2000 DOD Financial Management Improvement Plan

    National Research Council Canada - National Science Library

    2001-01-01

    The Federal Financial Management Improvement Act of 1996 requires DoD financial management systems to comply substantially with Federal financial management system requirements, Federal accounting standards, and the U.S...

  17. Application of Incident Command Structure to clinical trial management in the academic setting: principles and lessons learned.

    Science.gov (United States)

    Reynolds, Penny S; Michael, Mary J; Spiess, Bruce D

    2017-02-09

    Clinical trial success depends on appropriate management, but practical guidance to trial organisation and planning is lacking. The Incident Command System (ICS) is the 'gold standard' management system developed for managing diverse operations in major incident and public health arenas. It enables effective and flexible management through integration of personnel, procedures, resources, and communications within a common hierarchical organisational structure. Conventional ICS organisation consists of five function modules: Command, Planning, Operations, Logistics, and Finance/Administration. Large clinical trials will require a separate Regulatory Administrative arm, and an Information arm, consisting of dedicated data management and information technology staff. We applied ICS principles to organisation and management of the Prehospital Use of Plasma in Traumatic Haemorrhage (PUPTH) trial. This trial was a multidepartmental, multiagency, randomised clinical trial investigating prehospital administration of thawed plasma on mortality and coagulation response in severely injured trauma patients. We describe the ICS system as it would apply to large clinical trials in general, and the benefits, barriers, and lessons learned in utilising ICS principles to reorganise and coordinate the PUPTH trial. Without a formal trial management structure, early stages of the trial were characterised by inertia and organisational confusion. Implementing ICS improved organisation, coordination, and communication between multiple agencies and service groups, and greatly streamlined regulatory compliance administration. However, unfamiliarity of clinicians with ICS culture, conflicting resource allocation priorities, and communication bottlenecks were significant barriers. ICS is a flexible and powerful organisational tool for managing large complex clinical trials. However, for successful implementation the cultural, psychological, and social environment of trial participants must be

  18. Environmental Restoration Remedial Action Program records management plan

    International Nuclear Information System (INIS)

    Michael, L.E.

    1991-07-01

    The US Department of Energy-Richland Operations Office (DOE-RL) Environmental Restoration Field Office Management Plan [(FOMP) DOE-RL 1989] describes the plans, organization, and control systems to be used for management of the Hanford Site environmental restoration remedial action program. The FOMP, in conjunction with the Environmental Restoration Remedial Action Quality Assurance Requirements document [(QARD) DOE-RL 1991], provides all the environmental restoration remedial action program requirements governing environmental restoration work on the Hanford Site. The FOMP requires a records management plan be written. The Westinghouse Hanford Company (Westinghouse Hanford) Environmental Restoration Remedial Action (ERRA) Program Office has developed this ERRA Records Management Plan to fulfill the requirements of the FOMP. This records management plan will enable the program office to identify, control, and maintain the quality assurance, decisional, or regulatory prescribed records generated and used in support of the ERRA Program. 8 refs., 1 fig

  19. Savannah River Site Waste Management Program Plan, FY 1993

    International Nuclear Information System (INIS)

    1993-06-01

    The primary purpose of the Waste Management Program Plan is to provide an annual report on facilities being used to manage wastes, forces acting to change current waste management (WM) systems, and how operations are conducted. This document also reports on plans for the coming fiscal year and projects activities for several years beyond the coming fiscal year to adequately plan for safe handling and disposal of radioactive wastes generated at the Savannah River Site (SRS) and for developing technology for improved management of wastes

  20. Business continuity and disaster management within the public service in relation to a national development plan.

    Science.gov (United States)

    Ferguson, Cliff

    2018-01-01

    Within South Africa, few public service departments understand the concepts of business continuity management (BCM) and what it takes to implement a well-constructed business continuity plan. Likewise, few of these entities understand the purpose of designing and maintaining resilient systems that are immune to incidents. This paper discusses the integration of the South African Disaster Management Act 2002, the Disaster Management Framework and the National Development Plan, linking these to BCM, through a resilience period model, as a means for the implementation of resilience strategies. The goals of the National Development Plan are outlined with a view to how resilience can be achieved in each. A resilience period model has been advocated for the implementation of projects within the public sector in order to provide continuity and sustainability.

  1. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  2. Planning and management of cloud computing networks

    Science.gov (United States)

    Larumbe, Federico

    The evolution of the Internet has a great impact on a big part of the population. People use it to communicate, query information, receive news, work, and as entertainment. Its extraordinary usefulness as a communication media made the number of applications and technological resources explode. However, that network expansion comes at the cost of an important power consumption. If the power consumption of telecommunication networks and data centers is considered as the power consumption of a country, it would rank at the 5 th place in the world. Furthermore, the number of servers in the world is expected to grow by a factor of 10 between 2013 and 2020. This context motivates us to study techniques and methods to allocate cloud computing resources in an optimal way with respect to cost, quality of service (QoS), power consumption, and environmental impact. The results we obtained from our test cases show that besides minimizing capital expenditures (CAPEX) and operational expenditures (OPEX), the response time can be reduced up to 6 times, power consumption by 30%, and CO2 emissions by a factor of 60. Cloud computing provides dynamic access to IT resources as a service. In this paradigm, programs are executed in servers connected to the Internet that users access from their computers and mobile devices. The first advantage of this architecture is to reduce the time of application deployment and interoperability, because a new user only needs a web browser and does not need to install software on local computers with specific operating systems. Second, applications and information are available from everywhere and with any device with an Internet access. Also, servers and IT resources can be dynamically allocated depending on the number of users and workload, a feature called elasticity. This thesis studies the resource management of cloud computing networks and is divided in three main stages. We start by analyzing the planning of cloud computing networks to get a

  3. Transportation Demand Management Planning At Multi-Tenant Buildings, An Example Of Tdm Planning During Project

    Science.gov (United States)

    1988-09-01

    THIS GUIDE FOR DEVELOPERS, BUILDING OWNERS AND BUILDING MANAGERS IS ONE IN A SERIES OF SAMPLES OF TDM PLANS THAT ILLUSTRATE THE DESIGN AND PROPOSED APPLICATION OF TDM STRATEGIES. THIS SAMPLE PLAN WAS PREPARED FOR A FICTITIOUS BUILDING MANAGER NEAR DO...

  4. Incidence and management of biliary leakage after hepaticojejunostomy

    NARCIS (Netherlands)

    de Castro, Steve M. M.; Kuhlmann, Koert F. D.; Busch, Olivier R. C.; van Delden, Otto M.; Laméris, Johan S.; van Gulik, Thomas M.; Obertop, Hugo; Gouma, Dirk J.

    2005-01-01

    This study analyzes the change in the management of biliary leakage after hepaticojejunostomy. Between 1993 and 2003 all patients (n = 1033) were studied with a hepaticojejunostomv as part of a pancreatoduodenectomy (n = 486), proximal bile duct resection (without liver resection) (n = 35), and

  5. Adaptive Management Planning Projects as Conflict Resolution Processes

    Directory of Open Access Journals (Sweden)

    Greg Walkerden

    2006-06-01

    Full Text Available Adaptive management planning projects use multiparty, multidisciplinary workshops and simulation modeling to facilitate dialogue, negotiation, and planning. However, they have been criticized as a poor medium for conflict resolution. Alternative processes from the conflict resolution tradition, e.g., principled negotiation and sequenced negotiation, address uncertainty and biophysical constraints much less skillfully than does adaptive management. When we evaluate adaptive management planning using conflict resolution practice as a benchmark, we can design better planning procedures. Adaptive management planning procedures emerge that explore system structure, dynamics, and uncertainty, and that also provide a strong negotiation process, grounded in principled exploration of stakeholders' interests and needs. "Crossing" procedures in this manner is a fertile way of developing new forms of professional practice.

  6. Nurse manager succession planning: A cost-benefit analysis.

    Science.gov (United States)

    Phillips, Tracy; Evans, Jennifer L; Tooley, Stephanie; Shirey, Maria R

    2018-03-01

    This commentary presents a cost-benefit analysis to advocate for the use of succession planning to mitigate the problems ensuing from nurse manager turnover. An estimated 75% of nurse managers will leave the workforce by 2020. Many benefits are associated with proactively identifying and developing internal candidates. Fewer than 7% of health care organisations have implemented formal leadership succession planning programmes. A cost-benefit analysis of a formal succession-planning programme from one hospital illustrates the benefits of the programme in their organisation and can be replicated easily. Assumptions of nursing manager succession planning cost-benefit analysis are identified and discussed. The succession planning exemplar demonstrates the integration of cost-benefit analysis principles. Comparing the costs of a formal nurse manager succession planning strategy with the status quo results in a positive cost-benefit ratio. The implementation of a formal nurse manager succession planning programme effectively reduces replacement costs and time to transition into the new role. This programme provides an internal pipeline of future leaders who will be more successful than external candidates. Using an actual cost-benefit analysis equips nurse managers with valuable evidence depicting succession planning as a viable business strategy. © 2017 John Wiley & Sons Ltd.

  7. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  8. Developing Tribal Integrated Waste Management Plans

    Science.gov (United States)

    An IWMP outlines how the tribe will reduce, manage, and dispose of its waste. It identifies existing waste systems, assesses needs, and sets forth the ways to design, implement, and monitor a more effective and sustainable waste management program.

  9. 76 FR 61371 - All-Hazard Position Task Books for Type 3 Incident Management Teams

    Science.gov (United States)

    2011-10-04

    ...). 11. Division/Group Supervisor. 12. Unit Leader. 13. Strike Team/Task Force Leader. 14. Technical... Teams AGENCY: Federal Emergency Management Agency; DHS. ACTION: Notice of availability; request for comments. SUMMARY: The All-Hazard Position Task Books for Type 3 Incident Management Teams were developed...

  10. Tank waste remediation system tank waste retrieval risk management plan

    International Nuclear Information System (INIS)

    Klimper, S.C.

    1997-01-01

    This Risk Management Plan defines the approach to be taken to manage programmatic risks in the TWRS Tank Waste Retrieval program. It provides specific instructions applicable to TWR, and is used to supplement the guidance given by the TWRS Risk Management procedure

  11. [Preclinical and intrahospital management of mass casualties and terrorist incidents].

    Science.gov (United States)

    Franke, A; Bieler, D; Friemert, B; Kollig, E; Flohe, S

    2017-10-01

    Due to the recent terrorist attacks in Paris, Brussels, Ansbach, Munich, Berlin and more recently Manchester and London, terrorism is realized as a present threat to our society and social life, as well as a challenge for the health care system. Without fueling anxiety, there is a need for sensitization to this subject and to familiarize all concerned with the special kind of terrorist attack-related injuries, the operational priorities and tactics and the individual basic principles of preclinical and hospital care. There is a need to adapt the known established medical structure for a conventional mass casualty situation to the special requirements that are raised by this new kind of terrorist threat to our social life. It is the aim of this article, from a surgical point of view, to depict the tactics and challenges of preclinical care of the special kind of terrorist attack-related injuries from the site of the incident, via the advanced medical post or casualty collecting point, to the triage point at the hospital. The special needs of medical care and organizational aspects of the primary treatment in the hospital are highlighted and possible decisional options and different approaches are discussed.

  12. Finance and supply management project execution plan

    Energy Technology Data Exchange (ETDEWEB)

    BENNION, S.I.

    1999-02-10

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  13. Adoption of Building Information Modelling in project planning risk management

    Science.gov (United States)

    Mering, M. M.; Aminudin, E.; Chai, C. S.; Zakaria, R.; Tan, C. S.; Lee, Y. Y.; Redzuan, A. A.

    2017-11-01

    An efficient and effective risk management required a systematic and proper methodology besides knowledge and experience. However, if the risk management is not discussed from the starting of the project, this duty is notably complicated and no longer efficient. This paper presents the adoption of Building Information Modelling (BIM) in project planning risk management. The objectives is to identify the traditional risk management practices and its function, besides, determine the best function of BIM in risk management and investigating the efficiency of adopting BIM-based risk management during the project planning phase. In order to obtain data, a quantitative approach is adopted in this research. Based on data analysis, the lack of compliance with project requirements and failure to recognise risk and develop responses to opportunity are the risks occurred when traditional risk management is implemented. When using BIM in project planning, it works as the tracking of cost control and cash flow give impact on the project cycle to be completed on time. 5D cost estimation or cash flow modeling benefit risk management in planning, controlling and managing budget and cost reasonably. There were two factors that mostly benefit a BIM-based technology which were formwork plan with integrated fall plan and design for safety model check. By adopting risk management, potential risks linked with a project and acknowledging to those risks can be identified to reduce them to an acceptable extent. This means recognizing potential risks and avoiding threat by reducing their negative effects. The BIM-based risk management can enhance the planning process of construction projects. It benefits the construction players in various aspects. It is important to know the application of BIM-based risk management as it can be a lesson learnt to others to implement BIM and increase the quality of the project.

  14. Ground data system resource allocation planning to support mission management

    Science.gov (United States)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.; Taylor, Thomas M.

    1990-10-01

    Mission planning and manangement optimization using unique planning methodologies is described. The ground data system resource allocation process provides mission planners and managers with both short and long range visibility of resource loading. Launch dates, mission designs, and spacecraft sequencing can be planned to optimize science return despite limited resources. Periods of resource contention are identified for managers of flying missions in time for them to plan and implement alternatives rather than be forced to react hastily to unforeseen conflicts. Conflict resolution is by consensus, and a simple route of appeal is provided.

  15. Natural Resource Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    green, T.

    2011-08-15

    This comprehensive Natural Resource Management Plan (NRMP) for Brookhaven National Laboratory (BNL) was built on the successful foundation of the Wildlife Management Plan for BNL, which it replaces. This update to the 2003 plan continues to build on successes and efforts to better understand the ecosystems and natural resources found on the BNL site. The plan establishes the basis for managing the varied natural resources located on the 5,265 acre BNL site, setting goals and actions to achieve those goals. The planning of this document is based on the knowledge and expertise gained over the past 10 years by the Natural Resources management staff at BNL in concert with local natural resource agencies including the New York State Department of Environmental Conservation, Long Island Pine Barrens Joint Planning and Policy Commission, The Nature Conservancy, and others. The development of this plan is an attempt at sound ecological management that not only benefits BNL's ecosystems but also benefits the greater Pine Barrens habitats in which BNL is situated. This plan applies equally to the Upton Ecological and Research Reserve (Upton Reserve). Any difference in management between the larger BNL area and the Upton Reserve are noted in the text. The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is periodically reviewed and updated, typically every five years. This review and update was delayed to develop documents associated with a new third party facility, the Long Island Solar Farm. This two hundred acre facility will result in

  16. ACTDs: Management Plans as Predictors of Transition

    National Research Council Canada - National Science Library

    Phelps, Matthew; Wideman, Jeffrey S

    2007-01-01

    .... The methodology included case analysis of thirty-eight ACTD program business plans. Nineteen of the programs transitioned while the other nineteen were terminated either prior to the Military Unit Assessment (MUA...

  17. The relationship between the Municipal Master Plan and local Watershed Plans in water management

    Directory of Open Access Journals (Sweden)

    Denise Gallo Pizella

    2015-07-01

    Full Text Available The National Water Resources Policy has as one of its tools the drafting of local Water Resource Plans. In view of water resources planning and its relationship to land use planning, the aim of this work is to analyze the institutional and legal difficulties and the potential for an integrated system of water resources management. For this, we used the method of documentary and bibliographic research, beginning with the “Estatuto da Cidade”, a law for urban policy in Brazil, and literature on water management at the municipal and watershed levels. At the municipal level, the “Master Plan” (municipal plan of land use planning became the main instrument of territorial and municipal management, defining the parameters for the compliance of social, environmental and economic functions of real property. In this sense, the municipalities have a responsibility to protect water resources and, without local support, territorial and water management cannot be integrated in the context of the river basin. Despite the difficulties of including environmental variable in urban planning, the Master Plan has the potential to shape local water management systems that are environmentally sustainable and that progressively improve water quality and quantity within the watershed. Similarly, with more significant participation of the municipality in the Basin Committee, it is possible that the forms of municipal land use and occupation can be considered during the development and implementation of the Basin Plan. Thus, the management of water resources can occur integrally.

  18. Towards sustainable energy planning and management

    DEFF Research Database (Denmark)

    Østergaard, Poul Alberg; Sperling, Karl

    2014-01-01

    Rising energy costs, anthropogenic climate change, and fossil fuel depletion calls for a concerted effort within energy planning to ensure a sustainable energy future. This article presents an overview of global energy trends focusing on energy costs, energy use and carbon dioxide emissions....... Secondly, a review of contemporary work is presented focusing on national energy pathways with cases from Ireland, Denmark and Jordan, spatial issues within sustainable energy planning and policy means to advance a sustainable energy future....

  19. Soedra's ecological forest management plans. Effects on production and economy

    International Nuclear Information System (INIS)

    Viklund, E.

    1998-01-01

    In 1995 SOEDRA Skog, Sweden's largest forest owners association, started making ecological forest management plans, Groena skogsbruksplaner. The ecological forest management plans are divided into different compartments in which the management is adapted to the present ecological conditions. The stands are divided into four different categories depending on the different values of nature conservation. The object of this study was to find an easy method to quantify and describe the effects of nature conservation on economy and forest production in SOEDRA:s ecological forest management plans. The developed and purposed method, called PLAN-metoden, does not consider the interests, measures beyond the period of the plan, or losses due to snow or wind. It calculates the difference between the purposed measures in the ecological management plan and an alternative with management according to the requirements of the present Forestry Act. The economic effects of nature conservation varies between a net profit of 0,3% and a cost of 9,1% when calculated with the cash-flow method. The average decrease of possible cutting of merchantable timber was 11,3% and varies between 3,1 and 32,9%. The average decrease of cutting possibilities was 12,9% and varies between a decrease of 0,7% and a decrease of 28,3% when calculated with a present value method. Mainly mature, well-stocked compartments, which are considered not to be managed in the future, give rise to high costs. Properties with unprofitable thinnings and costly scarification, regeneration and cleaning seem to be favoured by the nature conservation in the plans. The Ecological management plans are expected to be of great importance to the members of SOEDRA. The interest in nature conservation is larger than that of economical issues. In order to avoid unsatisfactory results the planning should be accomplished in close personal contact with the forest owner Examination paper 1998-1. 21 refs, 2 figs, 39 tabs

  20. Preparing strategic information management plans for hospitals: a practical guideline SIM plans for hospitals: a guideline.

    Science.gov (United States)

    Brigl, B; Ammenwerth, E; Dujat, C; Gräber, S; Grosse, A; Häber, A; Jostes, C; Winter, A

    2005-01-01

    Systematic information management in hospitals demands for a strategic information management plan (SIM plan). As preparing a SIM plan is a considerable challenge we provide a practical guideline that is directly applicable when a SIM plan is going to be prepared. The guideline recommends a detailed structure of a SIM plan and gives advice about its content and the preparation process. It may be used as template, which can be adapted to the individual demands of any hospital. The guideline was used in several hospitals preparing a SIM plan. Experiences showed that the SIM plans could be prepared very efficiently and timely using the guideline, that the proposed SIM plan structure suited well, that the guideline offers enough flexibility to meet the requirements of the individual hospitals and that the specific recommendations of the guideline were very helpful. Nevertheless, we must strive for a more comprehensive theory of strategic information management planning which -- in the sense of enterprise architecture planning -- represents the intrinsic correlations of the different parts of a SIM plan to a greater extent.

  1. Control systems, personnel policies and management initiatives to limit pollution incidents

    International Nuclear Information System (INIS)

    Martin, B.F.

    1991-01-01

    After the regulatory requirements are met, an important collateral step in the continuing Hazardous Waste/Environmental Management cycle of activities is to minimize the possibility of a pollution incident, spill, contamination, mislabeling, mishandling or exposure, since this minimizes a major contingent liability of the company. Human failure accounts for 88% of accidents, 10% occur from mechanical failure and only 2% are unpreventable force majeure. This implies that fully 98% of all accidents can be prevented or minimized. Good engineering, production, management and educational practices can be formulated to minimize the occurrence and effects of accidental pollution incidents. Hazardous Material/Environmental Management tends to focus on technical and regulatory objectives, a reactionary mode caused in part by the rapidly changing regulatory environment and the need to continually adapt to these changes. Management functions such as personnel management and situational management get shortchanged in research and in practice. What is needed is a system that incorporates change readily, adapts personnel to change easily and mobilizes all the human resources of a company in meeting environmental and regulatory goals in the same way other goals of the company are met. Feedback Loop/Control System concepts have been applied to management practice in the popular Management By Objectives School as well as other schools of management practice. An Environmental Management program is proposed which incorporates feedback loop/ control systems to facilitate operations and training objectives and requirements. By incorporating Environmental and Hazardous Waste goals with other management goals in a system involving all levels of management and workers on the same team, the proposed system will reduce the probability of accidental pollution incidents and thus the contingent liability of a spill or other incident

  2. Air Force Critical Incident Stress Management outreach with Pentagon staff after the terrorist attack.

    Science.gov (United States)

    Rowan, Anderson B

    2002-09-01

    This article describes the Critical Incident Stress Management outreach to Pentagon staff conducted after the terrorist attack by a team of Air Force mental health and chaplain personnel. Also discussed are lessons learned from the author's experience while leading the mental health component and working in a larger tri-service outreach. Finally, the observed impacts of the outreach effort are examined along with recommendations for future postcritical incident outreach efforts.

  3. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  4. EPA Region 3 Quality Management Plans

    Science.gov (United States)

    Has links to resources that describe the Region's Quality Assurance Program, which is a collection of the Region's ongoing quality assurance (QA) policies, procedures, responsibilities and management systems.

  5. Peripartum cardiomyopathy: definition, incidence, etiopathogenesis, diagnosis, and management.

    Science.gov (United States)

    Garg, Jalaj; Palaniswamy, Chandrasekar; Lanier, Gregg M

    2015-01-01

    Peripartum cardiomyopathy (PPCM) is a serious pregnancy-associated disorder of unknown etiology. The precise cellular and molecular mechanisms underlying PPCM are unclear. A heightened awareness among health care providers can result in early diagnosis of heart failure in late pregnancy and the early postpartum period. Though the symptoms of dyspnea and fatigue can result from normal physiologic changes during pregnancy, an electrocardiogram and brain natriuretic peptide level should be obtained in these patients, in addition to baseline laboratory tests such as a complete blood count, and basic metabolic and hepatic function panels. If the electrocardiogram and brain natriuretic peptide level are abnormal, an echocardiogram should be obtained. The role of endomyocardial biopsy for the diagnosis of PPCM is controversial. Patients should be started on diuretics if volume overloaded, and beta-blockers (preferably metoprolol) if no contraindications exist; angiotensin-converting enzyme inhibitors and angiotensin receptor blockers should be avoided during pregnancy or lactation. There are no standard, universally accepted guidelines for the management of PPCM. Although experimental therapies like bromocriptine, pentoxifylline and immunoglobulins have shown promising results, large double-blind randomized trials are essential to confirm the results of smaller studies. In patients with persistent severe left ventricular (LV) dysfunction, advanced therapies like mechanical circulatory support and heart transplantation should be considered. Owing to recent data demonstrating deterioration of LV systolic function after initial recovery, it is essential to maintain long-term follow up of these patients regardless of initial recovery of LV function. We present a comprehensive review of the literature etiopathogenesis, diagnosis, and management of PPCM.

  6. Nurse manager residency program: an innovative leadership succession plan.

    Science.gov (United States)

    Watkins, Amy; Wagner, Jennifer; Martin, Christina; Grant, Brandy; Maule, Katrina; Resh, Kimberly; King, Lisa; Eaton, Holly; Fetter, Katrina; King, Stacey L; Thompson, Elizabeth J

    2014-01-01

    To ensure succession planning within the ranks of nurse managers meet current and projected nursing management needs and organizational goals, we developed and implemented a nurse manager residency program at our hospital. By identifying, supporting, and mentoring clinical experts who express a desire and display an aptitude for nursing leadership, we are graduating individuals who can transition to a nurse manager position with greater ease and competence.

  7. Software Configuration Management Plan for the Sodium Removal System

    Energy Technology Data Exchange (ETDEWEB)

    HILL, L.F.

    2000-03-06

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test.

  8. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    International Nuclear Information System (INIS)

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan

  9. Fact Sheet: Risk Management Plan (RMP) Audit Program

    Science.gov (United States)

    Risk management programs, which consist of a hazard assessment, a prevention program, and an emergency response program; must be periodically audited to assess whether the plans are adequate or need to be revised to comply with the regulation.

  10. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    International Nuclear Information System (INIS)

    Fritz, R.L.

    1995-01-01

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities

  11. Towards Data Management Planning Support for Research Data

    NARCIS (Netherlands)

    Görzig, Heike; Engel, Felix; Brocks, Holger; Vogel, Tobias; Hemmje, Matthias

    2015-01-01

    Görzig, H., Engel, F., Brocks, H., Vogel, T. & Hemmje, M. (2015, August). Towards Data Management Planning Support for Research Data. Paper presented at the ASE International Conference on Data Science, Stanford, United States of America.

  12. Comparison of the NCRA and NAACCR Strategic Management Plans.

    Science.gov (United States)

    Menck, Herman R

    2012-01-01

    The Strategic Management Plans of the National Cancer Registrars Association (NCRA) and the North American Association of Central Cancer Registries (NAACCR) were compared, and differences noted. No uncovered subject areas were found.

  13. Grout Treatment Facility Land Disposal Restriction Management Plan

    International Nuclear Information System (INIS)

    Hendrickson, D.W.

    1991-01-01

    This document establishes management plans directed to result in the land disposal of grouted wastes at the Hanford Grout Facilities in compliance with Federal, State of Washington, and Department of Energy land disposal restrictions. 9 refs., 1 fig

  14. Endocrine Disruptor Screening Program (EDSP) Comprehensive Management Plans

    Science.gov (United States)

    The EDSP Comprehensive Management Plan describes the technical review processes that will be used in implementing this program and how the agency intends to factor technology advancements into the program.

  15. Management plan -- Multi-Function Waste Tank Facility. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Fritz, R.L.

    1995-01-11

    This Westinghouse Hanford Company (WHC) Multi-Function Waste Tank Facility (MWTF) Management Plan provides guidance for execution WHC MWTF Project activities related to design, procurement, construction, testing, and turnover. This Management Plan provides a discussion of organizational responsibilities, work planning, project management systems, quality assurance (QA), regulatory compliance, personnel qualifications and training, and testing and evaluations. Classified by the US Department of Energy (DOE) as a major systems acquisition (MSA), the MWTF mission is to provide a safe, cost-effective, and environmentally sound method for interim storage of Hanford Site high-level wastes. This Management Plan provides policy guidance and direction to the Project Office for execution of the project activities.

  16. Nevada Test Site Resource Management Plan: Annual summary, January 2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-01-01

    The Nevada Test Site Resource Management Plan published in December of 1998 (DOE/NV--518) describes the Nevada Test Site stewardship mission and how its accomplishment will preserve the resources of the ecoregion while accomplishing the objectives of the mission. As part of the Nevada Test Site Resource Management Plan, DOE Nevada Operations Office has committed to perform and publish an annual summary review of DOE Nevada Operations' stewardship of the Nevada Test Site. This annual summary includes a description of progress made toward the goals of the Nevada Test Site Resource Management Plan, pertinent monitoring data, actions that were taken to adapt to changing conditions, and any other changes to the Nevada Test Site Resource Management Plan.

  17. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  18. Characterization of post-disaster environmental management for Hazardous Materials Incidents: Lessons learnt from the Tianjin warehouse explosion, China.

    Science.gov (United States)

    Zhang, Hui; Duan, Huabo; Zuo, Jian; Song, MingWei; Zhang, Yukui; Yang, Bo; Niu, Yongning

    2017-09-01

    Hazardous Materials Incidents (HMIs) have attracted a growing public concern worldwide. The health risks and environmental implications associated with HMIs are almost invariably severe, and underscore the urgency for sound management. Hazardous Materials Explosion incidents (HMEIs) belong to a category of extremely serious HMIs. Existing studies placed focuses predominately on the promptness and efficiency of emergency responses to HMIs and HMEIs. By contrast, post-disaster environmental management has been largely overlooked. Very few studies attempted to examine the post-disaster environmental management plan particularly its effectiveness and sufficiency. In the event of the Tianjin warehouse explosion (TWE), apart from the immediate emergency response, the post-disaster environmental management systems (P-EMSs) have been reported to be effective and sufficient in dealing with the environmental concerns. Therefore, this study aims to critically investigate the P-EMSs for the TWE, and consequently to propose a framework and procedures for P-EMSs in general for HMIs, particularly for HMEIs. These findings provide a useful reference to develop P-EMSs for HMIs in the future, not only in China but also other countries. Copyright © 2017. Published by Elsevier Ltd.

  19. Smallholder integrated crop management (ICM) research planning ...

    African Journals Online (AJOL)

    Mo

    farmers about their smallholder farm management practices. The results of the workshop would guide us in our effort to work with farmers to improve and sustain the land and crop management strategies used in Kayunga and Mukono districts. Approaches and Methods. Project core team. Scientists of Mukono ARDC and a ...

  20. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  1. Residuals Management and Water Pollution Control Planning.

    Science.gov (United States)

    Environmental Protection Agency, Washington, DC. Office of Public Affairs.

    This pamphlet addresses the problems associated with residuals and water quality especially as it relates to the National Water Pollution Control Program. The types of residuals and appropriate management systems are discussed. Additionally, one section is devoted to the role of citizen participation in developing management programs. (CS)

  2. Using management action plans to integrate program improvement efforts

    International Nuclear Information System (INIS)

    Meador, S.W.; Kidwell, R.J.; Shangraw, W.R.; Cardamone, E.N.

    1994-01-01

    The Department of Energy's (DOE's) Environmental Management Program is the country's largest and most sophisticated environmental program to date. The rapid expansion of the DOE's environmental restoration efforts has led to increased scrutiny of its management processes and systems. As the program continues to grow and mature, maintaining adequate accountability for resources and clearly communicating progress will be essential to sustaining public confidence. The Office of Environmental Management must ensure that adequate processes and systems are in place at Headquarters, Operation Offices, and contractor organizations. These systems must provide the basis for sound management, cost control, and reporting. To meet this challenge, the Office of Environmental Restoration introduced the Management Action Plan process. This process was designed to serve three primary functions: (1) define the program's management capabilities at Headquarters and Operations Offices; (2) describe how management initiatives address identified program deficiencies; and (3) identify any duplication of efforts or program deficiencies. The Environmental Restoration Management Action Plan is a tracking, reporting, and statusing tool, used primarily at the Headquarters level, for assessing performance in key areas of project management and control. BY DOE to communicate to oversight agencies and stakeholders a clearer picture of the current status of the environmental restoration project management system. This paper will discuss how Management Action Plans are used to provide a program-wide assessment of management capabilities

  3. Leadership and management curriculum planning for Iranian general practitioners

    OpenAIRE

    KHOSRAVAN, SHAHLA; KARIMI MOONAGHI, HOSSEIN; YAZDANI, SHAHRAM; AHMADI, SOLEIMAN; MANSOORIAN, MOHAMMAD REZA

    2015-01-01

    Introduction: Leadership and management are two expected features and competencies for general practitioners (GPs). The purpose of this study was leadership and management curriculum planning for GPs which was performed based on Kern’s curriculum planning cycle. Methods: This study was conducted in 2011-2012 in Iran using an explanatory mixed-methods approach. It was conducted through an initial qualitative phase using two focus group discussions and 28 semi-structured in...

  4. Groundwater/Vadose Zone Integration Project Management Plan

    International Nuclear Information System (INIS)

    Hughes, M. C.

    1999-01-01

    This Project Management Plan (PMP) defines the authorities, roles, and responsibilities of the US Department of Energy (DOE), Richland Operations Office (RL) and those contractor organizations participating in the Hanford Site' s Groundwater/Vadose Zone (GW/VZ) Integration Project. The PMP also describes the planning and control systems, business processes, and other management tools needed to properly and consistently conduct the Integration Project scope of work

  5. QUALITY MANAGEMENT PLAN FOR THE NATIONAL CHILDREN'S STUDY

    Science.gov (United States)

    EPA has taken the lead, in consort with NIH, in developing the Quality Management Plan (QMP) for the National Children's Study (NCS); the QMP will delineate a systematic planning process for the implementation of the NCS. The QMP will state the goals and objectives of the NCS, th...

  6. Strategic planning features of subsurface management in Kemerovo Oblast

    Science.gov (United States)

    Romanyuk, V.; Grinkevich, A.; Akhmadeev, K.; Pozdeeva, G.

    2016-09-01

    The article discusses the strategic planning features of regional development based on the production and subsurface management in Kemerovo Oblast. The modern approach - SWOT analysis was applied to assess the regional development strategy. The estimation of regional development plan implementation was given for the foreseeable future.

  7. Evaluating spatially explicit burn probabilities for strategic fire management planning

    Science.gov (United States)

    C. Miller; M.-A. Parisien; A. A. Ager; M. A. Finney

    2008-01-01

    Spatially explicit information on the probability of burning is necessary for virtually all strategic fire and fuels management planning activities, including conducting wildland fire risk assessments, optimizing fuel treatments, and prevention planning. Predictive models providing a reliable estimate of the annual likelihood of fire at each point on the landscape have...

  8. Information security management system planning for CBRN facilities

    Energy Technology Data Exchange (ETDEWEB)

    Lenaeu, Joseph D. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); O' Neil, Lori Ross [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Leitch, Rosalyn M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Glantz, Clifford S. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Landine, Guy P. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Bryant, Janet L. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Lewis, John [National Nuclear Lab., Workington (United Kingdom); Mathers, Gemma [National Nuclear Lab., Workington (United Kingdom); Rodger, Robert [National Nuclear Lab., Workington (United Kingdom); Johnson, Christopher [National Nuclear Lab., Workington (United Kingdom)

    2015-12-01

    The focus of this document is to provide guidance for the development of information security management system planning documents at chemical, biological, radiological, or nuclear (CBRN) facilities. It describes a risk-based approach for planning information security programs based on the sensitivity of the data developed, processed, communicated, and stored on facility information systems.

  9. Forest management planning for timber production: a sequential approach

    Science.gov (United States)

    Krishna P. Rustagi

    1978-01-01

    Explicit forest management planning for timber production beyond the first few years at any time necessitates use of information which can best be described as suspect. The two-step approach outlined here concentrates on the planning strategy over the next few years without losing sight of the long-run productivity. Frequent updating of the long-range and short-range...

  10. Land management planning: a method of evaluating alternatives

    Science.gov (United States)

    Andres Weintraub; Richard Adams; Linda Yellin

    1982-01-01

    A method is described for developing and evaluating alternatives in land management planning. A structured set of 15 steps provides a framework for such an evaluation. when multiple objectives and uncertainty must be considered in the planning process. The method is consistent with other processes used in organizational evaluation, and allows for the interaction of...

  11. Managing shoreline assessment data during the Lake Wabamun incident

    Energy Technology Data Exchange (ETDEWEB)

    Lamarche, A. [Environmental Performance and Decision Support, Montreal, PQ (Canada); Martin, V. [Eastern Canada Response Corp. Ltd., Vercheres, PQ (Canada)

    2009-07-01

    A freight train derailed near the shore of Lake Wabamun near Edmonton in August 2003, spilling about 750 m{sup 3} of heavy Bunker C oil on the lakeshore. The nature and extent of oiling was assessed over a period of 3 consecutive summers using a variety of techniques. Surface oiling along the shore was evaluated using the Shoreline Cleanup Assessment Team (SCAT) approach, with some modifications to consider local conditions. Oiling conditions of the submerged tar ball oil in the shallow near shore waters was evaluated in the summer of 2006. Several computerized functions were developed in order to provide reports and maps of the submerged oil conditions, so that the treatment team could remove most of the oil before the next reed growing season. The location of all observations were recorded using GPS. Lake Wabamun includes the following along its shores: industry which uses the lake water for cooling purposes; a provincial park; a First-nations reservation; and private residences. Since all survey data was made available to the general public, it had to be detailed and easy to understand. This paper described how some of the data management issues were addressed within the framework of the shoreline assessment organization. 6 refs., 3 tabs., 13 figs.

  12. Principles of Emergency Department facility design for optimal management of mass-casualty incidents.

    Science.gov (United States)

    Halpern, Pinchas; Goldberg, Scott A; Keng, Jimmy G; Koenig, Kristi L

    2012-04-01

    The Emergency Department (ED) is the triage, stabilization and disposition unit of the hospital during a mass-casualty incident (MCI). With most EDs already functioning at or over capacity, efficient management of an MCI requires optimization of all ED components. While the operational aspects of MCI management have been well described, the architectural/structural principles have not. Further, there are limited reports of the testing of ED design components in actual MCI events. The objective of this study is to outline the important infrastructural design components for optimization of ED response to an MCI, as developed, implemented, and repeatedly tested in one urban medical center. In the authors' experience, the most important aspects of ED design for MCI have included external infrastructure and promoting rapid lockdown of the facility for security purposes; an ambulance bay permitting efficient vehicle flow and casualty discharge; strategic placement of the triage location; patient tracking techniques; planning adequate surge capacity for both patients and staff; sufficient command, control, communications, computers, and information; well-positioned and functional decontamination facilities; adequate, well-located and easily distributed medical supplies; and appropriately built and functioning essential services. Designing the ED to cope well with a large casualty surge during a disaster is not easy, and it may not be feasible for all EDs to implement all the necessary components. However, many of the components of an appropriate infrastructural design add minimal cost to the normal expenditures of building an ED. This study highlights the role of design and infrastructure in MCI preparedness in order to assist planners in improving their ED capabilities. Structural optimization calls for a paradigm shift in the concept of structural and operational ED design, but may be necessary in order to maximize surge capacity, department resilience, and patient and

  13. Planning, Management, and Economics of Airport Operation

    Science.gov (United States)

    Wiley, J.

    1972-01-01

    An overview of the role of the airport in the transportation complex and in the community is presented. The establishment of the airport including its requirements in regional planning and the operation of the airport as a social and economic force are discussed.

  14. Integrating Risk Management and Strategic Planning

    Science.gov (United States)

    Achampong, Francis K.

    2010-01-01

    Strategic planning is critical to ensuring that institutions of higher education thoughtfully and systematically position themselves to accomplish their mission, vision, and strategic goals, particularly when these institutions face a myriad of risks that can negatively impact their continued financial viability and compromise their ability to…

  15. BUSINESS PLAN - MANAGEMENT TOOL OF THE ENTREPRENEUR

    Directory of Open Access Journals (Sweden)

    Nicoleta Ciucescu

    2016-06-01

    Full Text Available This paper proposes to highlight the importance of developing of a business plan, which is an indispensable tool for any entrepreneur, aims to reduce the degree of uncertainty in entrepreneurial activity, to reduce the company's environmental vulnerability. Thus the objectives of the paper consist on presentation of the concept define, the role, the functions of the business plan, also the typology, the stages concerning the preparation and the content. of it. The research method was to use a comparative study of the specialty literature. The business plan represents a logical flowchart of action, which involves perspective on thinking on a business, starting from certain objectives, helping to create an overall picture of the whole business. Basically it covers all stages and resources which will be necessary to an entrepreneur to achieve the proposed objectives in a predetermined time period. The business plan offers the possibility to assess the chances of success of businesses, representing a means to control for the entrepreneur on profitability and business viability through a systemic analysis of a comprehensive set of rigorously structured informations, providing thereby the knowing of all aspects involved in business and the effective and in depth preparing.

  16. EP&R Standards Project Report: Technical Review of National Incident Management Standards

    Energy Technology Data Exchange (ETDEWEB)

    Stenner, Robert D.

    2007-04-24

    The importance and necessity for a fully developed and implemented National Incident Management System (NIMS) has been demonstrated in recent years by the impact of national events such as Hurricane Katrina in 2005. Throughout the history of emergency response to major disasters, especially when multiple response organizations are involved, there have been systemic problems in the consistency and uniformity of response operations. Identifying national standards that support the development and implementation of NIMS is key to helping solve these systemic problems. The NIMS seeks to provide uniformity and consistency for incident management by using common terminology and protocols that will enable responders to coordinate their efforts to ensure an efficient response.

  17. Incidents in Czechoslovakian "Socialist Management" between 1956 and 1989. Conflict and Reconciliation

    Czech Academy of Sciences Publication Activity Database

    Vilímek, Tomáš; Tůma, Oldřich

    42/43, Spring-Summer (2016), s. 187-240 ISSN 1310-9456 Institutional support: RVO:68378114 Keywords : socialist management * centrally planned economy * Czechoslovakia 1956-1989 Subject RIV: AB - History

  18. NATURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    GREEN,T.ET AL.

    2003-12-31

    Brookhaven National Laboratory (BNL) is located near the geographic center of Long Island, New York. The Laboratory is situated on 5,265 acres of land composed of Pine Barrens habitat with a central area developed for Laboratory work. In the mid-1990s BNL began developing a wildlife management program. This program was guided by the Wildlife Management Plan (WMP), which was reviewed and approved by various state and federal agencies in September 1999. The WMP primarily addressed concerns with the protection of New York State threatened, endangered, or species of concern, as well as deer populations, invasive species management, and the revegetation of the area surrounding the Relativistic Heavy Ion Collider (RHIC). The WMP provided a strong and sound basis for wildlife management and established a basis for forward motion and the development of this document, the Natural Resource Management Plan (NRMP), which will guide the natural resource management program for BNL. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL. The appendices provide specific management requirements for threatened and endangered amphibians and fish (Appendices A and B respectively), lists of actions in tabular format (Appendix C), and regulatory drivers for the Natural Resource Program (Appendix D). The purpose of the Natural Resource Management Plan is to provide management guidance, promote stewardship of the natural resources found at BNL, and to integrate their protection with pursuit of the Laboratory's mission. The philosophy or guiding principles of the NRMP are stewardship, adaptive ecosystem management, compliance, integration with other plans and requirements, and incorporation of community involvement, where applicable.

  19. Quality Management Plan for EPA Region 1

    Science.gov (United States)

    The QMP describes policies, procedures & management systems within EPA NE that govern quality assurance & quality control activities supporting the transparency & scientific defensibility of environmental data collected, used & disseminated by the Region.

  20. REGINALT - a tool for management planning

    International Nuclear Information System (INIS)

    Loughead, J.S.C.

    1987-01-01

    REGINALT is a computer-based decision support system that can be used by non-programmers to evaluate a comprehensive approach to commercial low-level radioactive waste (LLRW) management. REGINALT allows a waste management person to consider technical, financial, and scheduling differences between possible scenarios. This paper explains the type of data which are needed, how these data are processed, and the type of reports available from the REGINALT system. 2 figures, 3 tables

  1. 75 FR 71730 - General Management Plan/Wilderness Study/Off-Road Vehicle Management Plan, Final Environmental...

    Science.gov (United States)

    2010-11-24

    ... used to keep the public informed and involved throughout the planning process for the Addition. The...--the continuation of current management practices and trends. The enabling legislation would be the...

  2. Oak Ridge National Laboratory Environmenal, Safety, and Health Management Plan

    International Nuclear Information System (INIS)

    1991-12-01

    The 1990 Tiger Team Appraisal of Oak Ridge National Laboratory (ORNL) revealed that neither Martin Marietta Energy Systems, Inc. (Energy Systems) nor ORNL had a strategic plan for Environmental, Safety, and Health (ES ampersand H) activities. There were no detailed plans describing ORNL's mission, objectives, and strategies for ES ampersand H activities. A number of plans do exist that cover various aspects of ES ampersand H. Their scope ranges from multiyear program plans to annual audit schedules to compliance plans to action plans from specific audits. However, there is not a single document that identifies the plans and the objectives they are to address. This document describes the strategic plan for ORNL and provides the linkage among existing plans. It gives a brief description of the organization and management of ES ampersand H activities at ORNL. The plan identifies the general strategies to be taken by ORNL, using the overall guidance from Energy Systems in its corporate ES ampersand H Strategic Plan. It also identifies more detailed plans for implementation of these strategies, where appropriate

  3. Financial performance of health plans in Medicaid managed care.

    Science.gov (United States)

    McCue, Mike

    2012-01-01

    This study assesses the financial performance of health plans that enroll Medicaid members across the key plan traits, specifically Medicaid dominant, publicly traded, and provider-sponsored. National Association of Insurance Commissioners (NAIC) financial data, coupled with selected state financial data, were analyzed for 170 Medicaid health plans for 2009. A mean test compared the mean values for medical loss, administrative cost, and operating margin ratios across these plan traits. Medicaid dominant plans are plans with 75 percent of their total enrollment in the Medicaid line of business. Plans that are Medicaid dominant and publicly traded incurred a lower medical loss ratio and higher administrative cost ratio than multi-product and non-publicly traded plans. Medicaid dominant plans also earned a higher operating profit margin. Plans offering commercial and Medicare products are operating at a loss for their Medicaid line of business. Health plans that do not specialize in Medicaid are losing money. Higher medical cost rather than administrative cost is the underlying reason for this financial loss. Since Medicaid enrollees do not account for their primary book of business, these plans may not have invested in the medical management programs to reduce inappropriate emergency room use and avoid costly hospitalization.

  4. Managing minor incidents - Providing information for the public

    International Nuclear Information System (INIS)

    Joukovskaia, O.

    1999-01-01

    banks reachable for population, specialists, organisations; 3. organise and conduct briefings for mass media representatives (permanent seminar or workshop for mass media representatives); 4. conduct permanent monitoring of situation in the information sector and informing of population on the questions of overcoming of the Chernobyl NPP catastrophe consequences and safety life style provision; 5. begin educational work among the population on radiation and ecological safety. The exposed facts must be taken into consideration during planning and implementation of actions aimed at provision of safe activity of population

  5. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  6. Disruption management - operations research between planning and execution

    DEFF Research Database (Denmark)

    Clausen, Jens; Larsen, Jesper; Larsen, Allan

    2001-01-01

    For a large number of applications Operations Research has a proven track record: it can deliver high quality solutions for planning problems. Important examples can be found in the airline industry, logistics and production management. This report will describe real-world examples of a novel way...... of applying Operations Research: As plans have to be adjusted to take last minute changes into consideration, OR can play an active role in such a situation by producing, maybe even in a pro-actively role, alternative plans. This type of activity is called Disruption Management....

  7. 40 CFR 60.2899 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Preconstruction Siting Analysis Waste Management Plan § 60.2899 What is a waste management plan? A waste management plan is a written plan that...

  8. 40 CFR 60.2055 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Which Modification or Reconstruction Is Commenced on or After June 1, 2001 Waste Management Plan § 60.2055 What is a waste management plan? A waste management plan is a written plan that identifies both...

  9. 40 CFR 62.14580 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What is a waste management plan? 62... Construction On or Before November 30, 1999 Waste Management Plan § 62.14580 What is a waste management plan? A waste management plan is a written plan that identifies both the feasibility and the methods used to...

  10. 76 FR 38672 - Order of Succession for the Office of Strategic Planning and Management

    Science.gov (United States)

    2011-07-01

    ... Office of Strategic Planning and Management AGENCY: Office of Strategic Planning and Management, HUD... Planning and Management, designates the Order of Succession for the Office of Strategic Planning and..., 2011. FOR FURTHER INFORMATION CONTACT: Nina M. Coward, Office of Strategic Planning and Management...

  11. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-06-05

    ... Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Contra Costa Water District. City of Santa... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans...

  12. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2010-11-16

    ... Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The following Water Management Plans are available for review: Orland-Artois Water District Kern Tulare Water... Water Management Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans...

  13. Two incidents that changed quality management in the Australian livestock export industry

    Directory of Open Access Journals (Sweden)

    Peter R. Stinson

    2008-03-01

    Full Text Available Quality assurance in Australia's livestock export industry arose from a need to address animal welfare concerns. It was initially instigated by industry in the form of an accreditation scheme which contained standards, auditing requirements and training requirements. Two major incidents in long haul shipping of livestock demonstrated that risk management in the industry cannot be achieved through compliance with standards alone. A thorough investigation of the first incident recommended the introduction of formal risk management to complement a standards regime. This approach is applicable to the management of major risks, such as heat stress and disease. It is also especially suited to commercial risks, such as the rejection of cargo and where voyage or market specific treatments are needed and depend upon the expertise of the exporter. However, before these recommendations on risk management could be fully implemented, a significant public incident occurred which altered the direction of quality assurance in industry. The Australian response was to transfer authority to government regulators with a tightening of standards. This focuses on the need to ensure ownership of quality assurance programmes by the exporter. Formal risk management has been a casualty of the second incident and, unfortunately, has not been introduced.

  14. WILDLAND FIRE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION

    2003-09-01

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP that details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and

  15. Critical Incident Stress Management (CISM) in complex systems: cultural adaptation and safety impacts in healthcare.

    Science.gov (United States)

    Müller-Leonhardt, Alice; Mitchell, Shannon G; Vogt, Joachim; Schürmann, Tim

    2014-07-01

    In complex systems, such as hospitals or air traffic control operations, critical incidents (CIs) are unavoidable. These incidents can not only become critical for victims but also for professionals working at the "sharp end" who may have to deal with critical incident stress (CIS) reactions that may be severe and impede emotional, physical, cognitive and social functioning. These CIS reactions may occur not only under exceptional conditions but also during every-day work and become an important safety issue. In contrast to air traffic management (ATM) operations in Europe, which have readily adopted critical incident stress management (CISM), most hospitals have not yet implemented comprehensive peer support programs. This survey was conducted in 2010 at the only European general hospital setting which implemented CISM program since 2004. The aim of the article is to describe possible contribution of CISM in hospital settings framed from the perspective of organizational safety and individual health for healthcare professionals. Findings affirm that daily work related incidents also can become critical for healthcare professionals. Program efficiency appears to be influenced by the professional culture, as well as organizational structure and policies. Overall, findings demonstrate that the adaptation of the CISM program in general hospitals takes time but, once established, it may serve as a mechanism for changing professional culture, thereby permitting the framing of even small incidents or near misses as an opportunity to provide valuable feedback to the system. Copyright © 2014 Elsevier Ltd. All rights reserved.

  16. Planning and Management Guidelines for Inland Lake Property Owners.

    Science.gov (United States)

    Van Dusen, Peter; Marsh, William M.

    This booklet is designed to assist prospective and established property owners in the selection, planning, and management of lake lands. It is organized into three parts: (1) selection and preparation of a building site; (2) property management; and (3) community development. These sections outline some basic guidelines for land development and…

  17. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... harvest levels based on intensified management practices, such as reforestation, thinning, and tree... have any substantive legal effect but it simply makes clear that the planning rule complies with the... consider the effects of an explicit intensified-management-practices provision among alternatives, because...

  18. Department of Defense Strategic Management Plan FY 2012 - FY 2013

    Science.gov (United States)

    2011-09-20

    contingencies; preserve and enhance the All-Volunteer Force; and reform the business and support functions of the Defense enterprise. This Strategic ... Management Plan (SMP) establishes management goals for business operations linked to the DoD’s overarching strategic goals and objectives. Amplifying the

  19. Perception of scale in forest management planning: Challenges and implications

    Science.gov (United States)

    Swee May Tang; Eric J. Gustafson

    1997-01-01

    Forest management practices imposed at one spatial scale may affect the patterns and processes of ecosystems at other scales. These impacts and feedbacks on the functioning of ecosystems across spatial scales are not well understood. We examined the effects of silvicultural manipulations simulated at two spatial scales of management planning on landscape pattern and...

  20. Presentation of Coastal Environmental Management Plan by using ...

    African Journals Online (AJOL)

    The provision of environment management plan and formulating the environmental strategies of coastal regions are the most essential measures required for the integrated management of coastal regions. For this purpose, this research has been conducted using two goal-oriented and problem-oriented approaches in ...

  1. A Model for Understanding Management Manpower: Forecasting and Planning

    Science.gov (United States)

    Deckard, Noble S.; Lessey, Kenneth W.

    1975-01-01

    The authors, realizing the importance of continuous organizational reappraisal of manpower needs and strengths, have developed a model based on supply of management manpower and demand for management manpower. Without a manpower forecasting/planning program, the future needs of the organization are reduced to guesswork. (EA)

  2. Best management practices for creating a community wildfire protection plan

    Science.gov (United States)

    Pamela J. Jakes; Christine Esposito; Sam Burns; Antony S. Cheng; Kristen C. Nelson; Victoria E. Sturtevant; Daniel R. Williams

    2012-01-01

    A community wildfire protection plan (CWPP) is a means of bringing local solutions to wildland fire management. In developing and implementing CWPPs, communities assume a leadership role in reducing wildfi re risk on federal and nonfederal land. In this publication, we identify best management practices for CWPP development and implementation based on the experiences...

  3. Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994

    International Nuclear Information System (INIS)

    Turner, J.W.

    1993-12-01

    US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, open-quotes Waste Management Plan Outline.close quotes These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES ampersand H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY) 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are

  4. Wildland Fire Management Plan for Brookhaven National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Green,T.

    2009-10-23

    This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policy for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the

  5. Crisis management: Planning for the inevitable

    Directory of Open Access Journals (Sweden)

    Niyaz Aboudzadeh

    2014-06-01

    Full Text Available The aim of this study is to identify important factors influencing organizational readiness to deal with the crisis in business organizations. The study designs a questionnaire in Likert scale and distributes it among some experts who work for Mapna company in Iran. The study uses the method developed by Mitroff (2005 [Mitroff, I. I. (2005. Why some companies emerge stronger and better from a crisis: 7 essential lessons for surviving disaster. AMACOM Div American Mgmt Assn.], which investigates the effects of four factors including job satisfaction, increase in income, cost reduction and change in strategies on crisis management. Using Pearson correlation ratio, the study has confirmed a positive and meaningful relationship between crisis management and three factors including increase in income, cost reduction and change in strategies. However, the study did not find any evidence to support the relationship between job satisfaction and crisis management.

  6. Causal Factors and Adverse Events of Aviation Accidents and Incidents Related to Integrated Vehicle Health Management

    Science.gov (United States)

    Reveley, Mary S.; Briggs, Jeffrey L.; Evans, Joni K.; Jones, Sharon M.; Kurtoglu, Tolga; Leone, Karen M.; Sandifer, Carl E.

    2011-01-01

    Causal factors in aviation accidents and incidents related to system/component failure/malfunction (SCFM) were examined for Federal Aviation Regulation Parts 121 and 135 operations to establish future requirements for the NASA Aviation Safety Program s Integrated Vehicle Health Management (IVHM) Project. Data analyzed includes National Transportation Safety Board (NSTB) accident data (1988 to 2003), Federal Aviation Administration (FAA) incident data (1988 to 2003), and Aviation Safety Reporting System (ASRS) incident data (1993 to 2008). Failure modes and effects analyses were examined to identify possible modes of SCFM. A table of potential adverse conditions was developed to help evaluate IVHM research technologies. Tables present details of specific SCFM for the incidents and accidents. Of the 370 NTSB accidents affected by SCFM, 48 percent involved the engine or fuel system, and 31 percent involved landing gear or hydraulic failure and malfunctions. A total of 35 percent of all SCFM accidents were caused by improper maintenance. Of the 7732 FAA database incidents affected by SCFM, 33 percent involved landing gear or hydraulics, and 33 percent involved the engine and fuel system. The most frequent SCFM found in ASRS were turbine engine, pressurization system, hydraulic main system, flight management system/flight management computer, and engine. Because the IVHM Project does not address maintenance issues, and landing gear and hydraulic systems accidents are usually not fatal, the focus of research should be those SCFMs that occur in the engine/fuel and flight control/structures systems as well as power systems.

  7. Danish risk management plans of the EU Floods Directive

    DEFF Research Database (Denmark)

    Jebens, Martin; Sørensen, Carlo Sass; Piontkowitz, Thorsten

    2016-01-01

    We evaluate the impact and effect of the EU Flood’s Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation. In a qualitative research approach, the flood risk management plans published by 22 Danish municipalities are reviewed...... and analyzed regarding main objectives and structural and non-structural mitigation measures. From the analyses conclusions are drawn on the non-structural risk management measures still to be improved to obtain the full benefits from the Directive. Conclusions point to the need of introducing better decision...

  8. Strategy plan for management of Hanford tank wastes

    International Nuclear Information System (INIS)

    Humphreys, L.L.; Morgan, S.R.

    1993-01-01

    The Secretary of Energy in 1992 directed Hanford to plan for the retrieval and processing of all stored high level waste at Hanford for disposal at an offsite repository. This substantial change in the tank disposal program's assignment has resulted in a reevaluation of the entire Tank Waste Remediation System (TWRS) strategy. This strategic plan covers that portion of the TWRS strategy related to management of stored tank waste until it is retrieved, processed, and disposed by the disposal program and covers the responsibilities assigned to the ''manage tank waste'' function. The ''manage tank waste'' function is one of the level 2 functions as set forth in the Tank Waste Remediation System Mission Analysis Report (Baynes et al. 1993) and depicted in Figure 1. The following level 3 functions have been developed below the level 2, ''manage tank waste'' function: (1) Store waste; (2) Transfer waste; (3) Characterize, surveil and monitor waste; (4) Restore and upgrade systems; (5) Manage tank waste management system

  9. 49 CFR 633.25 - Contents of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  10. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  11. Management Planning Requirements for Implementing Office Automation.

    Science.gov (United States)

    McDole, Thomas L.

    To be successful in implementing office automation, office managers must consider more than the obvious question of which system to purchase. They must consider whether automation of their particular office and operations will yield benefits of a significant magnitude to warrant the expense of money, time, and energy needed to install and operate…

  12. An integrative methodological framework for sustainable environmental planning and management

    Science.gov (United States)

    Armitage, Derek

    1995-07-01

    Sustainable environmental planning and management require effective integration of ecological, socioeconomic, and institutional elements. This paper presents an integrative methodological framework for sustainable environmental planning and management. The development of this integrative framework is accomplished by combining two complementary analytical approaches—Hufschmidt's conceptual framework for watershed planning and management and the ABC resource survey method. The combined methodological framework seeks to delineate and synthesize essential ecological information utilizing an integrative resource survey method. This method generates classifications of environmental significance and constraint. Areas of environmental significance and constraint are then linked to appropriate and acceptable resource management actions, implementation tools (e.g., education, technical assistance), and institutional and organizational arrangements. The integrative methodological framework was developed for application in the Rio Fortuna watershed in Costa Rica's Arenal Conservation Area. The watershed is characterized by a variety of land and resource uses, including biologically diverse and ecologically fragile protected areas, small-parcel agriculture, cattle ranching, and tourism.

  13. Project Management Plan for the INEL technology logic diagrams

    International Nuclear Information System (INIS)

    Rudin, M.J.

    1992-10-01

    This Project Management Plan (PjMP) describes the elements of project planning and control that apply to activities outlined in Technical Task Plan (TTP) ID-121117, ''Technology Logic Diagrams For The INEL.'' The work on this project will be conducted by personnel in EG ampersand G Idaho, Inc.'s Waste Technology Development Program. Technology logic diagrams represent a formal methodology to identify technology gaps or needs within Environmental Restoration/Waste Management Operations, which will focus on Office of Environmental Restoration and Waste Management (EM-50) research and development, demonstration, test, and evaluation efforts throughout the US Department of Energy complex. This PjMP describes the objectives, organization, roles and responsibilities, workscope and processes for implementing and managing the technology logic diagram for the Idaho National Engineering Laboratory project

  14. TWRS safety and technical integration risk management plan

    International Nuclear Information System (INIS)

    Fordham, R.A.

    1996-01-01

    The objectives of the Tank Waste Remediation System (TWRS) Safety and Technical Integration (STI) programmatic risk management program are to assess, analyze, and handle risks associated with TWRS STI responsibilities and to communicate information about the actions being taken and the results to enable decision making. The objective of this TWRS STI Risk Management Plan is to communicate a consistent approach to risk management that will be used by the organization

  15. Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective

    OpenAIRE

    T?rkay, Metin; Sara?o?lu, ?zt?rk; Arslan, Mehmet Can

    2016-01-01

    Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor us...

  16. Spent Nuclear Fuel project systems engineering management plan

    International Nuclear Information System (INIS)

    Womack, J.C.

    1995-01-01

    The purpose of the WHC Systems Engineering Management Plan (SEMP) is to describe the systems engineering approach and methods that will be integrated with established WHC engineering practices to enhance the WHC engineering management of the SNF Project. The scope of the SEMP encompasses the efforts needed to manage the WHC implementation of systems engineering on the SNF Project. This implementation applies to, and is tailored to the needs of the SNF project and all its subprojects, including all current and future subprojects

  17. 78 FR 19523 - General Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation...

    Science.gov (United States)

    2013-04-01

    ... Management Plan, Draft Environmental Impact Statement, Lake Meredith National Recreation Area and Alibates... Management Plan, Lake Meredith National Recreation Area and Alibates Flint Quarries National Monument, Texas... management alternatives for Lake Meredith National Recreation Area and three management alternatives for...

  18. Applying the concept of network enabled capabilities to incident management in the Netherlands

    NARCIS (Netherlands)

    Immers, L.H.; Huisken, G.

    2008-01-01

    The application of Incident Management to the Dutch road network suffers from serious problems in terms of availability of accurate and up-to-date information. In this paper we present an approach aimed at diminishing the occurrence of misunderstandings. This approach is based on the concept of

  19. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  20. Smothering in UK free-range flocks. Part 1: incidence, location, timing and management.

    Science.gov (United States)

    Barrett, J; Rayner, A C; Gill, R; Willings, T H; Bright, A

    2014-07-05

    Smothering in poultry is an economic and welfare-related concern. This study presents the first results from a questionnaire addressing the incidence, location, timing and management of smothering of free-range farm managers from two commercial egg companies (representing 35 per cent of the UK free-range egg supply). Overall, nearly 60 per cent of farm mangers experienced smothering in their last flock, with an average of 25.5 birds lost per incidence, although per cent mortality due to smothering was low (x̄=1.6 per cent). The majority of farm managers also reported that over 50 per cent of all their flocks placed had been affected by smothering. The location and timing of smothering (excluding smothering in nest boxes) tended to be unpredictable and varied between farms. Blocking off corners/nest boxes and walking birds more frequently were identified as popular smothering reduction measures, although there was a wide variety of reduction measures reported overall. The motivation to implement reduction measures was related to a farm manager's previous experience of smothering. To our knowledge, this is the first study to provide a representative industry estimate on the incidence, location, timing and management of smothering. The results suggest that smothering is a common problem, unpredictable between flocks with no clear, effective reduction strategies. A follow-up study will investigate the correlations among smothering, disease and other welfare problems and may shed further light on management solutions. British Veterinary Association.

  1. Errors in the management of cardiac arrests: an observational study of patient safety incidents in England.

    Science.gov (United States)

    Panesar, Sukhmeet S; Ignatowicz, Agnieszka M; Donaldson, Liam J

    2014-12-01

    The aim of this qualitative study is to better understand the types of error occurring during the management of cardiac arrests that led to a death. All patient safety incidents involving management of cardiac arrests and resulting in death which were reported to a national patient safety database over a 17-month period were analysed. Structured data from each report were extracted and these together with the free text, were subjected to content analysis which was inductive, with the coding scheme emerged from continuous reading and re-reading of incidents. There were 30 patient safety incidents involving management of cardiac arrests and resulting in death. The reviewers identified a main shortfall in the management of each cardiac arrest and this resulted in 12 different factors being documented. These were grouped into four themes that highlighted systemic weaknesses: miscommunication involving crash number (4/30, 13%), shortfalls in staff attending the arrest (4/30, 13%), equipment deficits (11/30, 36%), and poor application of knowledge and skills (11/30, 37%). The factors identified represent serious shortfalls in the quality of response to cardiac arrests resulting in death in hospital. No firm conclusion can be drawn about how many deaths in the study population would have been averted if the emergency had been managed to a high standard. The effective management of cardiac arrests should be considered as one of the markers of safe care within a healthcare organisation.

  2. River Protection Project (RPP) Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    SEEMAN, S.E.

    2000-04-01

    The U.S. Department of Energy (DOE), in accordance with the Strom Thurmond National Defense Authorization Act for Fiscal Year 1999, established the Office of River Protection (ORP) to successfully execute and manage the River Protection Project (RPP), formerly known as the Tank Waste Remediation System (TWRS). The mission of the RPP is to store, retrieve, treat, and dispose of the highly radioactive Hanford tank waste in an environmentally sound, safe, and cost-effective manner. The team shown in Figure 1-1 is accomplishing the project. The ORP is providing the management and integration of the project; the Tank Farm Contractor (TFC) is responsible for providing tank waste storage, retrieval, and disposal; and the Privatization Contractor (PC) is responsible for providing tank waste treatment.

  3. Double Shell Tanks (DST) and Waste Feed Delivery Project Management Quality Affecting Procedures Management Plan

    International Nuclear Information System (INIS)

    LUND, D.P.

    2000-01-01

    The purpose of the Double Shell Tanks (DST) and Waste Feed Delivery (WFD) Management Assessment Plan is to define how management assessments within DST h WFD will be conducted. The plan as written currently includes only WFD Project assessment topics. Other DST and WFD group assessment topics will be added in future revisions

  4. Hanford Sampling Quality Management Plan (HSQMP)

    International Nuclear Information System (INIS)

    Hyatt, J.E.

    1995-06-01

    HSQMP establishes quality requirements in response to DOE Order 5700. 6C and to 10 Code of Federal Regulations 830.120. HSQMP is designed to meet the needs of Richland Operations Office for controlling the quality of services provided by sampling operations. It is issued through the Analytical Services Program of the Waste Programs Division. This document describes the Environmental Sampling and Analysis Program activities considered to represent the best management activities necessary to achieve a sampling program with adequate control

  5. State planning council on radioactive waste management

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This report contains the findings and policy resolutions resulting from the Council's meeting. The texts of policy resolutions on radioactive waste transport, spent fuel storage, and high-level radioactive waste disposal test facilities are included. A draft legislation statement is presented in support of the establishment of a clear national policy for high-level radioactive waste disposal and management. A status report containing a summary of regional activities in the field of low-level radioactive wastes is presented

  6. Evaluation of participatory planning: Lessons from Hungarian Natura 2000 management planning processes.

    Science.gov (United States)

    Kovács, Eszter; Kelemen, Eszter; Kiss, Gabriella; Kalóczkai, Ágnes; Fabók, Veronika; Mihók, Barbara; Megyesi, Boldizsár; Pataki, György; Bodorkós, Barbara; Balázs, Bálint; Bela, Györgyi; Margóczi, Katalin; Roboz, Ágnes; Molnár, Dániel

    2017-12-15

    Stakeholder participation in nature conservation policies and especially in the management of protected areas has gained importance in the last decades. These changes are underlined by democratic principles and the perceived contribution of stakeholder involvement to the effectiveness of conservation management. Evaluating participatory processes is essential to learn about the past and thus increase the quality of future processes. The evaluation can be useful for the organisations responsible for planning and management, stakeholders and policy makers as well. The present paper shows the results of a systematic evaluation of 25 participatory processes related to the development of management plans for Natura 2000 sites in Hungary between 2007 and 2015. A conceptual framework was developed to evaluate the process and outcome of participatory management planning processes. Criteria were based on the scientific literature on public participation and tailored to conservation-related management planning and stakeholder involvement. Evaluated processes were grouped in three cases based on their time range and financial sources. Overall, the analysed processes scored at a medium level, showing better performance in the process criteria than in the outcome criteria. The best case scored significantly higher in four criteria compared to the other cases: representativeness, resource availability for facilitation, new, creative ideas and impact on the plan. The main factors behind the success were (1) embeddedness of the planning process in a larger project, where the plan was a tool for conservation, (2) carrying out only one process at a time, (3) previous experience of facilitators and planners with participatory planning and (4) the opportunity and capacity to propose a payment scheme as an incentive. But even this case received low scores in some criteria: conflict resolution, early involvement and well defined goals. Based on the results we suggest that more data is

  7. Pandemic planning as risk management: how fared the Australian federation?

    Science.gov (United States)

    Carney, Terry; Bailey, Richard; Bennett, Belinda

    2012-03-01

    The role of law in managing public health challenges such as influenza pandemics poses special challenges. This article reviews Australian plans in the context of the H1N1 09 experience to assess whether risk management was facilitated or inhibited by the "number" of levels or phases of management, the degree of prescriptive detail for particular phases, the number of plans, the clarity of the relationship between them, and the role of the media. Despite differences in the content and form of the plans at the time of the H1N1 09 emerging pandemic, the article argues that in practice, the plans proved to be responsive and robust bases for managing pandemic risks. It is suggested that this was because the plans proved to be frameworks for coordination rather than prescriptive straitjackets, to be only one component of the regulatory response, and to offer the varied tool box of possible responses, as called for by the theory of responsive regulation. Consistent with the principle of subsidiarity, it is argued that the plans did not inhibit localised responses such as selective school closures or rapid responses to selected populations such as cruise ship passengers.

  8. Technical assistance contractor Management Plan. Final [report

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The Technical Assistance Contractor (TAC) for the Uranium Mill Tailings Remedial Action (UMTRA) Project comprises Jacobs Engineering Group Inc. (JEG) and its major teaming partners [Roy F. Weston, Inc. (RFW), Sergent, Hauskins & Beckwith Agra, Inc. (SHB Agra), and Geraghty & Miller, Inc. (G&M)]. The first three companies have worked together effectively on the UMTRA Project for more than 10 years. With the initiation of the UMTRA Groundwater Project in April 1991, a need arose to increase the TAC`s groundwater technical breadth and depth, so G&M was brought in to augment the team`s capabilities. The TAC contract`s scope is to provide technical, analytical, environmental, engineering, design, inspection, and management support services to the US Department of Energy (DOE) for both surface and groundwater projects. The TAC team continues to support the DOE in completing surface remedial actions and initiating groundwater remediation work for start-up, characterization, design, construction oversight, and remedial operations. A key feature of the TAC`s management approach is the extensive set of communication systems implemented for the UMTRA Project. These systems assist all functional disciplines in performing UMTRA Project tasks associated with management, technical support, administrative support, and financial/project controls.

  9. 24 CFR 570.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... environmental design and policy-planning-management-capacity building activities. 570.205 Section 570.205..., urban environmental design and policy-planning-management-capacity building activities. (a) Planning...-oriented planning related to properties with known or suspected environmental contamination. However, costs...

  10. 24 CFR 1003.205 - Eligible planning, urban environmental design and policy-planning-management-capacity building...

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Eligible planning, urban environmental design and policy-planning-management-capacity building activities. 1003.205 Section 1003.205... planning, urban environmental design and policy-planning-management-capacity building activities. (a...

  11. TECHNIQUE OF OPTIMAL AUDIT PLANNING FOR INFORMATION SECURITY MANAGEMENT SYSTEM

    Directory of Open Access Journals (Sweden)

    F. N. Shago

    2014-03-01

    Full Text Available Complication of information security management systems leads to the necessity of improving the scientific and methodological apparatus for these systems auditing. Planning is an important and determining part of information security management systems auditing. Efficiency of audit will be defined by the relation of the reached quality indicators to the spent resources. Thus, there is an important and urgent task of developing methods and techniques for optimization of the audit planning, making it possible to increase its effectiveness. The proposed technique gives the possibility to implement optimal distribution for planning time and material resources on audit stages on the basis of dynamics model for the ISMS quality. Special feature of the proposed approach is the usage of a priori data as well as a posteriori data for the initial audit planning, and also the plan adjustment after each audit event. This gives the possibility to optimize the usage of audit resources in accordance with the selected criteria. Application examples of the technique are given while planning audit information security management system of the organization. The result of computational experiment based on the proposed technique showed that the time (cost audit costs can be reduced by 10-15% and, consequently, quality assessments obtained through audit resources allocation can be improved with respect to well-known methods of audit planning.

  12. FEMA's Earthquake Incident Journal: A Web-Based Data Integration and Decision Support Tool for Emergency Management

    Science.gov (United States)

    Jones, M.; Pitts, R.

    2017-12-01

    For emergency managers, government officials, and others who must respond to rapidly changing natural disasters, timely access to detailed information related to affected terrain, population and infrastructure is critical for planning, response and recovery operations. Accessing, analyzing and disseminating such disparate information in near real-time are critical decision support components. However, finding a way to handle a variety of informative yet complex datasets poses a challenge when preparing for and responding to disasters. Here, we discuss the implementation of a web-based data integration and decision support tool for earthquakes developed by the Federal Emergency Management Agency (FEMA) as a solution to some of these challenges. While earthquakes are among the most well- monitored and measured of natural hazards, the spatially broad impacts of shaking, ground deformation, landslides, liquefaction, and even tsunamis, are extremely difficult to quantify without accelerated access to data, modeling, and analytics. This web-based application, deemed the "Earthquake Incident Journal", provides real-time access to authoritative and event-specific data from external (e.g. US Geological Survey, NASA, state and local governments, etc.) and internal (FEMA) data sources. The journal includes a GIS-based model for exposure analytics, allowing FEMA to assess the severity of an event, estimate impacts to structures and population in near real-time, and then apply planning factors to exposure estimates to answer questions such as: What geographic areas are impacted? Will federal support be needed? What resources are needed to support survivors? And which infrastructure elements or essential facilities are threatened? This presentation reviews the development of the Earthquake Incident Journal, detailing the data integration solutions, the methodology behind the GIS-based automated exposure model, and the planning factors as well as other analytical advances that

  13. Master plan: Guntersville Reservoir Aquatic Plant Management. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    In 1989, Congress provided funding to start a five-year comprehensive project to manage aquatic plants in Guntersville Reservoir, to be jointly implemented by the US Army Corps of Engineers (Corps) and Tennessee Valley Authority (TVA). TVA serves as the overall project coordinator and is the lead agency for this project. Known as the Joint Agency Guntersville Project (JAGP), the project will test and demonstrate innovative management technologies, and incorporate the most effective technologies into a comprehensive aquatic plant management plan for Guntersville Reservoir. The JAGP is intended to serve as a National Demonstration Project for aquatic plant management. As part of this JAGP, the Master Plan for Aquatic Plant Management for the Guntersville Reservoir Project, Alabama-Tennessee is authorized by Corps Contract Number DACW62-90-C-0067.

  14. Data Management Plan: HarassMap

    Directory of Open Access Journals (Sweden)

    Reem Wael

    2017-07-01

    Full Text Available HarassMap is an Egyptian organisation that works to create an environment where sexual harassment is not tolerated, and where individuals and institutions take action against it. For the purpose of this project, the project team cleaned up, organised, and made openly available for the public to access and use through a web portal, three main types of data: Crowdsourced reports of sexual harassment incidents (reports on HarassMap’s online reporting and mapping system - CSV and XLS Field data from HarassMap’s research on sexual harassment using traditional qualitative and quantitative research methods - DOCX, PDF, SAV, MP3 Social media conversations (comment threads and messages related to sexual harassment on harassMap’s Facebook page - XLS The social media data was collected retrospectively from our Facebook page during the project period and covers the period 2010-2016. The crowdsourced data and the research data was cleaned and organised to make sure it is usable for the public but still kept in its raw format. During the collection and organisation period, we also made sure to clear out all personal identifiers from the data to ensure anonymity and confidentiality, and prepared descriptions of each dataset that will help the public understand how the data was collected and how it can and cannot be used. The data is stored online on a web portal that we built together with a web developer during the project period. On the web portal, the data is available for the public to view, search and download for research or other purposes. The data is also backed up on a hard drive and the cloud. The web portal and HarassMap open data will be advertised on our website, and the direct link shared with our contacts and others who approach us with interest in our data.

  15. Crawler Acquisition and Testing Demonstration Project Management Plan

    International Nuclear Information System (INIS)

    DEFIGH-PRICE, C.

    2000-01-01

    If the crawler based retrieval system is selected, this project management plan identifies the path forward for acquiring a crawler/track pump waste retrieval system, and completing sufficient testing to support deploying the crawler for as part of a retrieval technology demonstration for Tank 241-C-104. In the balance of the document, these activities will be referred to as the Crawler Acquisition and Testing Demonstration. During recent Tri-Party Agreement negotiations, TPA milestones were proposed for a sludge/hard heel waste retrieval demonstration in tank C-104. Specifically one of the proposed milestones requires completion of a cold demonstration of sufficient scale to support final design and testing of the equipment (M-45-03G) by 6/30/2004. A crawler-based retrieval system was one of the two options evaluated during the pre-conceptual engineering for C-104 retrieval (RPP-6843 Rev. 0). The alternative technology procurement initiated by the Hanford Tanks Initiative (HTI) project, combined with the pre-conceptual engineering for C-104 retrieval provide an opportunity to achieve compliance with the proposed TPA milestone M-45-03H. This Crawler Acquisition and Testing Demonstration project management plan identifies the plans, organizational interfaces and responsibilities, management control systems, reporting systems, timeline and requirements for the acquisition and testing of the crawler based retrieval system. This project management plan is complimentary to and supportive of the Project Management Plan for Retrieval of C-104 (RPP-6557). This project management plan focuses on utilizing and completing the efforts initiated under the Hanford Tanks Initiative (HTI) to acquire and cold test a commercial crawler based retrieval system. The crawler-based retrieval system will be purchased on a schedule to support design of the waste retrieval from tank C-104 (project W-523) and to meet the requirement of proposed TPA milestone M-45-03H. This Crawler

  16. Quality assurance management plan special analytical support

    Energy Technology Data Exchange (ETDEWEB)

    Myers, M.L.

    1997-01-30

    It is the policy of Special Analytical Support (SAS) that the analytical aspects of all environmental data generated and processed in the laboratory, subject to the Environmental Protection Agency (EPA), U.S. Department of Energy (DOE), WDOE or other project specific requirements, be of known and acceptable quality. It is the intention of this QAPP to establish and assure that an effective quality controlled management system is maintained in order to meet the quality requirements of the intended use(s) of the data.

  17. Savannah River Waste Management Program Plan - FY 1982

    International Nuclear Information System (INIS)

    1981-12-01

    This document provides the program plan as requested by the Savannah River Operations Office of the Department of Energy. The plan was developed to provide a working knowledge of the nature and extent of the waste management programs being undertaken by Savannah River (SR) contractors for the Fiscal Year 1982. In addition, the document projects activities for several years beyond 1982 to adequately plan for safe handling and storage of radioactive wastes generated at Savannah River, for developing technology to immobilize high-level radioactive wastes generated and stored at SR, and for developing technology for improved management of low-level solid wastes. A revised plan will be issued prior to the beginning of the first quarter of each fiscal year. In this document, work descriptions and milestone schedules are current as of the date of publication. Budgets are based on available information as of October 1, 1981

  18. Danish risk management plans of the EU floods directive

    DEFF Research Database (Denmark)

    Sørensen, Carlo Sass; Jebens, Martin; Piontkowitz, Thorsten

    2017-01-01

    The paper evaluates the impact and effect of the EU Flood's Directive (2007/60/EC) in Denmark and the flood risk management plans that are the result of the national implementation in the first plan period (2010-2015). Twenty flood risk management plans have been elaborated and published by the 22...... Danish municipalities included in 10 risk areas appointed due to a risk of floods from rivers, the sea, or both. For the municipal work, the national government has provided hazard, vulnerability, and risk assessments and maps as well as guidelines to fulfil the legal binding of the Directive. The plans...... are reviewed and analysed regarding main objectives and structural and non-structural mitigation measures. Conclusions point to the need of introducing better decision support systems, a need to define acceptable risks, and a need to enhance coordination between municipal and cross-sectorial actors as well...

  19. Energy management information systems - planning manual and tool

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    An Energy Management Information System (EMIS) provides relevant information that makes energy, performance visible to various levels of an organization, enabling individuals and departments to plan, make decisions and take effective action to manage energy. This manual has two objectives: 1. To enable companies to conduct EMIS audits and prepare EMIS implementation plans; 2. To provide companies with the tools to prepare a financial business case for EMIS implementation. This manual consists of four parts: 1. EMIS Audit is theoretical and provides the methodology to be used by outside or in-house engineers and consultants to do a thorough EMIS Audit. 2. Implementation Plan is to help industry do the work themselves. 3. Appendices is to help the user develop an EMIS Audit, gather data and score their company, prepare a conceptual and detailed design, as well as a business and financial plan for implementation.

  20. Analysis of Incident and Accident Reports and Risk Management in Spine Surgery.

    Science.gov (United States)

    Kobayashi, Kazuyoshi; Imagama, Shiro; Ando, Kei; Hida, Tetsuro; Ito, Kenyu; Tsushima, Mikito; Ishikawa, Yoshimoto; Matsumoto, Akiyuki; Morozumi, Masayoshi; Nishida, Yoshihiro; Nagao, Yoshimasa; Ishiguro, Naoki

    2017-08-01

    A review of accident and incident reports. To analyze prevalence, characteristics, and details of perioperative incidents and accidents in patients receiving spine surgery. In our institution, a clinical error that potentially results in an adverse event is usually submitted as an incident or accident report through a web database, to ensure anonymous and blame-free reporting. All reports are analyzed by a medical safety management group. These reports contain valuable data for management of medical safety, but there have been no studies evaluating such data for spine surgery. A total of 320 incidents and accidents that occurred perioperatively in 172 of 415 spine surgeries were included in the study. Incidents were defined as events that were "problematic, but with no damage to the patient," and accidents as events "with damage to the patient." The details of these events were analyzed. There were 278 incidents in 137 surgeries and 42 accidents in 35 surgeries, giving prevalence of 33% (137/415) and 8% (35/415), respectively. The proportion of accidents among all events was significantly higher for doctors than non-doctors [68.0% (17/25) vs. 8.5% (25/295), P < 0.01] and in the operating room compared with outside the operating room [40.5% (15/37) vs. 9.5% (27/283), P < 0.01]. There was no significant difference in years of experience among personnel involved in all events. The major types of events were medication-related, line and tube problems, and falls and slips. Accidents also occurred because of a long-term prone position, with complications such as laryngeal edema, ulnar nerve palsy, and tooth damage. Surgery and procedures in the operating room always have a risk of complications. Therefore, a particular effort is needed to establish safe management of this environment and to provide advice on risk to the doctor and medical care team. 4.

  1. Data management plan for HANDI 2000 business management system

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, D.

    1998-08-25

    The Hanford Data Integration 2000 (HANDI 2000) Project will result in an integrated and comprehensive set of functional applications containing core information necessary to support the Project Hanford Management Contract (PHMC). It is based on the Commercial-Off-The-Shelf (COTS) product solution with commercially proven business processes. The COTS product solution set, of PassPort (PP) and PeopleSoft (PS) software, supports finance, supply and chemical management/Material Safety Data Sheet.

  2. Oak Ridge National Laboratory Waste Management Plan. Rev. 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-12-01

    The goal of the Oak Ridge National Laboratory (ORNL) Waste Management Program is the protection of workers, the public, and the environment. A vital aspect of this goal is to comply with all applicable state, federal, and DOE requirements. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation (TDEC) and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of the Oak Ridge National Laboratory Waste Management Plan is to compile and to consolidate information annually on how the ORNL Waste Management is to compile and to consolidate information annually on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what forces are acting to change current waste management systems, what activities are planned for the forthcoming fiscal year (FY), and how all of the activities are documented.

  3. [Incidence and management of ectopic pregnancy in Iceland 2000-2009].

    Science.gov (United States)

    Baldvinsdottir, Áslaug; Gudmundsson, Jens A; Geirsson, Reynir Tómas

    2013-12-01

    Ectopic pregnancy can be life-threatening. Its treatment has changed radically during the last two decades. The study objective was to evaluate incidence and treatment of ectopic pregnancy in the Icelandic population during the decade 2000-2009. Information was collected about all diagnosed cases, place and method of treatment and admissions. The annual incidence was calculated with reference to number of pregnancies (n/1000), number of women aged 15-44 years (n/10 000) and by 5-year age groups, comparing the periods 2000-2004 and 2005-2009. The number of ectopic pregnancies during these 10 years was 836, or 444 during the years 2000-2004 and 392 during 2005-2009. The average annual incidence was 15.6/1000 pregnancies and 12.9/10 000 women. There was an annual incidence reduction from 17.3 to 14.1/1000 pregnancies (ptreatment for 94.9% of women, methotrexate in 3.2% and expectant management in 1.9%. Surgical management decreased from 98.0% to 91.3% between 5-year periods as medical treatment increased (0.4% to 6.4%; pectopic pregnancy is comparable to the development in neighbouring countries. Management has changed with increased use of laparoscopic surgery, medical and expectant treatment.

  4. On Planning and Managing the Preservation of Historical Buildings

    Directory of Open Access Journals (Sweden)

    Č. Jarský

    2003-01-01

    Full Text Available The process of preserving and reconstructing historical buildings poses several specific questions and raises problems which must be solved in the planning and management stage of the building process - from questions of architectural and art-historical significance, via the future purpose of use of the building, links to the surrounding buildings, environmental questions, questions of cost, time analysis, and quality assurance problems. Many of these problems can be solved with the help of a computer model of the course of the rehabilitation and reconstruction of the building created by a construction technology network diagram. The CONTEC integrated project planning, management and quality control system based on these diagrams has been used for bidding, planning and managing the reconstruction process of several significant historical buildings in Prague and other cities.

  5. Preventive distribution and plans of iodine tablets stocks management

    International Nuclear Information System (INIS)

    2002-01-01

    This official note includes two parts: one concerns the new preventive distribution of iodine tablets on the areas defined by the Particular Intervention Plans (P.P.I.) around nuclear facilities and the other one the setting up of iodine tablets stocks beyond the P.P.I. areas. In annexe is a guide for the elaboration of stocks management plans for steady iodine tablets. (N.C.)

  6. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Science.gov (United States)

    2012-10-22

    ... Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Orange Vale Water District City of Folsom Santa... Plans (Criteria). For the purpose of this announcement, Water Management Plans (Plans) are considered...

  7. LAND MANAGEMENT REGULATION AS AN INSTRUMENT FOR PLANNING IN UKRAINE

    Directory of Open Access Journals (Sweden)

    O. Dorosh

    2017-05-01

    Full Text Available The presence of problems in the territorial management of land indicates that the system of state and municipal management does not meet the modern requirements of sustainable (balanced development. The explanation is simple - if the planning of the development of territories of settlements takes place on the basis of approved urban planning documentation (master plans, then the territory of land tenure and land use outside their borders is notfully covered by development of land management documentation. In this regard, the importance of the development and implementation of land management regulations at the practical level as an important land-use planning tool is substantiated. Essential and meaningful signs of the concepts of "urban planning regulations", "land management regulations" for conducting researchesare found. The National Standard defines the concept of urban planning regulations, such as the use of land plots, established within the respective territorial zones and defines the types of preferential and related use of land, the limits of permitted construction, reconstruction of construction objects and is used in the design, construction and subsequent operation of Objects. The draft law of Ukraine "On zoning of land" proposed the definition of land management regulations as approved in accordance with the established procedure text materials, that determine the parameters of the permitted use of land (land use regime and acceptable changes in these parameters. However, this draft law is not harmonized during the 10-year period at the state level, therefore the proposed terms and definitions do not fully comply with modern requirements. Therefore, it is proposed to supplement them with other terms and definitions. Based on the research carried out, the author's definition of land management regulations should be understood as the procedure for land use, which is established within the respective territorial zones, with the

  8. Optical Networks Solutions planning - performances - management

    DEFF Research Database (Denmark)

    Fenger, Christian

    2002-01-01

    are kept optical and not converted into the optical domain. The focus is on the scientific results achieved throughout the Ph.D. period. Five subjects – all increasing the understanding of optical networks – are studied. Static wavelength routed optical networks are studied. Management on terms...... of lightpath allocation and design is considered. By using statistical models (simultaneous analysis of many networks) the correspondence between parameters determining the network topology and the performance of the optical network is found. These dependencies are important knowledge in the process...... of designing a network. It is also seen (statistically) found that the effect of wavelength converters on the performance of static wavelength routed optical networks is negligible. Dynamic wavelength routed optical networks are simulated and analyzed. Manangement of dynamic networks is a more complex task...

  9. Planning and Management of Technology Deployment Center

    International Nuclear Information System (INIS)

    Park, Jae Won; Joo, Po Kook; Kim, Jun Yeon and others

    2005-08-01

    The R and D contents are summarized as follows ; Models were set-up for transferring the developed technologies to the industry and managing technology deployment center to vitalize the commercialization and then the set-up model was tried to apply for transferring technologies for commercialization and to define interfaces between the R and D and industrial applications In this project, new products and processes were developed for promoting the commercialization. Infra-structures were firmly set-up for the venture company promotion and technology deployment developed during executing the proton Engineering frontier Project. Commercialization methodology connection with industrial companies were studied by outside specializing institute. Development of gem-stone coloring and new photo catalyst producing techniques are very high value-adding technologies, therefore, experimental and theoretical R and D were transacted simultaneously to obtain the originality of the technology. The theoretical R and D was committed to a specialist outside

  10. PFP Interface identification and management planning guide; TOPICAL

    International Nuclear Information System (INIS)

    SINCLAIR, J.C.

    1999-01-01

    The purpose of-this planning guide is to present the process used to identify, document, and control PFP Stabilization and Deactivation Project interfaces. Revisions to this document will include, as attachments, the most recent version of the Project Interface Management List. A preliminary Interface Management List is included in Appendix A. This document is intended be a Project owned management tool. As such, this document will periodically require revisions resulting from improvements of the information, processes, and techniques as now described. For most revisions that suggest improved processes, PFP management approval is all that will be required

  11. Knowledge Management Platform in Advanced Product Quality Planning

    Science.gov (United States)

    Chiliban, Bogdan; Baral, Lal Mohan; Kifor, Claudiu

    2014-12-01

    Knowledge is an essential part of organizational competitiveness. This vital resource must be managed correctly within organizations in order to achieve desired performance levels within all undertakings. The process of managing knowledge is a very difficult one due to the illusive nature of the resource itself. Knowledge is stored within every aspect of an organization starting from people and ending with documents and processes. The Knowledge Management Platform is designed as a facilitator for managers and employees in all endeavours knowledge related within the Advanced Product Quality Planning Procedure

  12. ORNL long-range environmental and waste management plan

    Energy Technology Data Exchange (ETDEWEB)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs.

  13. ORNL long-range environmental and waste management plan

    International Nuclear Information System (INIS)

    Baldwin, J.S.; Bates, L.D.; Brown, C.H.; Easterday, C.A.; Hill, L.G.; Kendrick, C.M.; McNeese, L.E.; Myrick, T.E.; Payne, T.L.; Pepper, C.E.; Robinson, S.M.; Rohwer, P.S.; Scanlan, T.F.; Smith, M.A.; Stratton, L.E.; Trabalka, J.R.

    1989-09-01

    This report, the ORNL Long-Range Environmental and Waste Management Plan, is the annual update in a series begun in fiscal year 1985. Its primary purpose is to provide a thorough and systematic planning document to reflect the continuing process of site assessment, strategy development, and planning for the current and long-term control of environmental issues, waste management practices, and remedial action requirements. The document also provides an estimate of the resources required to implement the current plan. This document is not intended to be a budget document; it is, however, intended to provide guidance to both Martin Marietta Energy Systems, Inc., and the US Department of Energy (DOE) management as to the near order of magnitude of the resources (primarily funding requirements) and the time frame required to execute the strategy in the present revision of the plan. As with any document of this nature, the near-term (one to three years) part of the plan is a pragmatic assessment of the current program and ongoing capital projects and reflects the efforts perceived to be necessary to comply with all current state and federal regulations and DOE orders. It also should be in general agreement with current budget (funding) requests and obligations for these immediate years. 55 figs., 72 tabs

  14. Planning analysis and political steering with New Public Management

    DEFF Research Database (Denmark)

    Sager, Tore Øivin; Sørensen, Claus Hedegaard

    2011-01-01

    of interviews sheds light on the apparent paradox that parliamentarians accept delegation of highway investment decisions despite their profound scepticism to the cost-benefit analyses and impact calculations that are essential to management by objectives and results, which was to give them continued political......Interviews with members of the Norwegian national assembly’s Standing Committee for Transport and Communications were conducted in 1995, 1997, 2001, and 2004. The politicians were asked about the usefulness of analytic input that planners contribute to national plans, first the Norwegian Road...... and Road Traffic Plan and later the National Transport Plan. Questions related to steering, coordination, delegation, and the inclusiveness of the planning process were also posed. Changes in the politicians’ attitudes to types of analytic planning input are outlined. Furthermore, the last round...

  15. Planning and management of science programs on Skylab

    Science.gov (United States)

    Parker, R. A. R.; Sevier, J. R.

    1974-01-01

    Discussion of the experience gained in experiment operation planning during the Skylab mission. The Skylab flight planning activity allowed the experimenters to interact with the system and provided the flexibility to respond to contingencies both major and minor. Both these aspects contributed to make efficient use of crew time thus helping to increase the science return from the mission. Examples of the need for real time scheduling response and of the tradeoffs considered between conflicting experiment requirements are presented. General management principles derived from this experience are developed. The Skylab mission experiences, together with previous Apollo mission experiences, are shown to provide a good background for Shuttle flight planning.

  16. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  17. Association between osteoporosis treatment change and adherence, incident fracture, and total healthcare costs in a Medicare Advantage Prescription Drug plan.

    Science.gov (United States)

    Ward, M A; Xu, Y; Viswanathan, H N; Stolshek, B S; Clay, B; Adams, J L; Kallich, J D; Fine, S; Saag, K G

    2013-04-01

    We examined the association between osteoporosis treatment change and adherence, incident fractures, and healthcare costs among Medicare Advantage Prescription Drug (MAPD) plan members. Treatment change was associated with a small but significant increase in adherence, but was not associated with incident fracture or total healthcare costs. Overall adherence remained low. We examined the association between osteoporosis treatment change and adherence, incident fractures, and healthcare costs among MAPD plan members in a large US health plan. We conducted a retrospective cohort study of MAPD plan members aged≥50 years newly initiated on an osteoporosis medication between 1 January 2006 and 31 December 2008. Members were identified as having or not having an osteoporosis treatment change within 12 months after initiating osteoporosis medication. Logistic regression analyses and difference-in-difference (DID) generalized linear models were used to investigate the association between osteoporosis treatment change and (1) adherence to treatment, (2) incident fracture, and (3) healthcare costs at 12 and 24 months follow-up. Of the 33,823 members newly initiated on osteoporosis treatment, 3,573 (10.6%) changed osteoporosis treatment within 12 months. After controlling for covariates, osteoporosis treatment change was associated with significantly higher odds of being adherent (medication possession ratio [MPR]≥0.8) at 12 months (odds ratio [OR]=1.18) and 24 months (OR=1.13) follow-up. However, overall adherence remained low (MPR=0.59 and 0.51 for the change cohort and MPR=0.51 and 0.44 for the no-change cohort at 12 and 24 months, respectively). Osteoporosis treatment change was not significantly associated with incident fracture (OR=1.00 at 12 months and OR=0.98 at 24 months) or total direct healthcare costs (p>0.4) in the DID analysis, but was associated with higher pharmacy costs (p<0.004). Osteoporosis treatment change was associated with a small but significant

  18. 40 CFR 62.14590 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... Commenced Construction On or Before November 30, 1999 Waste Management Plan § 62.14590 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or... use of recyclable materials. The plan must identify any additional waste management measures, and the...

  19. 40 CFR 60.3010 - What is a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false What is a waste management plan? 60... Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Waste Management Plan § 60.3010 What is a waste management plan? A waste management plan is a...

  20. 40 CFR 62.14431 - What must my waste management plan include?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false What must my waste management plan... Before June 20, 1996 Waste Management Plan § 62.14431 What must my waste management plan include? Your waste management plan must identify both the feasibility of, and the approach for, separating certain...

  1. 40 CFR 60.3012 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ..., 2004 Model Rule-Waste Management Plan § 60.3012 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation of waste-stream elements.... The plan must identify any additional waste management measures and implement those measures the...

  2. 40 CFR 60.2630 - What should I include in my waste management plan?

    Science.gov (United States)

    2010-07-01

    ... or Before November 30, 1999 Model Rule-Waste Management Plan § 60.2630 What should I include in my waste management plan? A waste management plan must include consideration of the reduction or separation... of recyclable materials. The plan must identify any additional waste management measures, and the...

  3. 40 CFR 62.14430 - Must I prepare a waste management plan?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Must I prepare a waste management plan... 20, 1996 Waste Management Plan § 62.14430 Must I prepare a waste management plan? Yes. All HMIWI owners or operators must have a waste management plan. ...

  4. 78 FR 65962 - Revision of the Land Management Plan for the Flathead National Forest

    Science.gov (United States)

    2013-11-04

    ... results in a Forest Land Management Plan which describes the strategic direction for management of forest... and implementing their land management plans. Forest plans describe the strategic direction for... DEPARTMENT OF AGRICULTURE Forest Service Revision of the Land Management Plan for the Flathead...

  5. 40 CFR 62.14432 - When must my waste management plan be completed?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false When must my waste management plan be... Before June 20, 1996 Waste Management Plan § 62.14432 When must my waste management plan be completed? As specified in §§ 62.14463 and 62.14464, you must submit your waste management plan with your initial report...

  6. A systematic process for developing and assessing accident management plans

    International Nuclear Information System (INIS)

    Hanson, D.J.; Blackman, H.S.; Meyer, O.R.; Ward, L.W.

    1991-04-01

    This document describes a four-phase approach for developing criteria recommended for use in assessing the adequacy of nuclear power plant accident management plans. Two phases of the approach have been completed and provide a prototype process that could be used to develop an accident management plan. Based on this process, a preliminary set of assessment criteria are derived. These preliminary criteria will be refined and improved when the remaining steps of the approach are completed, that is, after the prototype process is validated through application. 9 refs., 10 figs., 7 tabs

  7. Light Duty Utility Arm computer software configuration management plan

    International Nuclear Information System (INIS)

    Philipp, B.L.

    1998-01-01

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software

  8. Data Management and Preservation Planning for Big Science

    Directory of Open Access Journals (Sweden)

    Juan Bicarregui

    2013-06-01

    Full Text Available ‘Big Science’ - that is, science which involves large collaborations with dedicated facilities, and involving large data volumes and multinational investments – is often seen as different when it comes to data management and preservation planning. Big Science handles its data differently from other disciplines and has data management problems that are qualitatively different from other disciplines. In part, these differences arise from the quantities of data involved, but possibly more importantly from the cultural, organisational and technical distinctiveness of these academic cultures. Consequently, the data management systems are typically and rationally bespoke, but this means that the planning for data management and preservation (DMP must also be bespoke.These differences are such that ‘just read and implement the OAIS specification’ is reasonable Data Management and Preservation (DMP advice, but this bald prescription can and should be usefully supported by a methodological ‘toolkit’, including overviews, case-studies and costing models to provide guidance on developing best practice in DMP policy and infrastructure for these projects, as well as considering OAIS validation, audit and cost modelling.In this paper, we build on previous work with the LIGO collaboration to consider the role of DMP planning within these big science scenarios, and discuss how to apply current best practice. We discuss the result of the MaRDI-Gross project (Managing Research Data Infrastructures – Big Science, which has been developing a toolkit to provide guidelines on the application of best practice in DMP planning within big science projects. This is targeted primarily at projects’ engineering managers, but intending also to help funders collaborate on DMP plans which satisfy the requirements imposed on them.

  9. The EPA-Wide Plan to Provide Solid Waste Management Capacity Assistance to Tribes

    Science.gov (United States)

    This Plan is a strategy for building tribal capacity to manage solid waste. The Plan promotes the development and implementation of integrated waste management plans and describes how EPA will prioritize its resources to maximize environmental benefits.

  10. CULTURAL RESOURCE MANAGEMENT PLAN FOR BROOKHAVEN NATIONAL LABORATORY.

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, M.

    2005-04-01

    The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references all facets and interrelationships of cultural resources at BNL. This document specifically follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9-22-04[m1]). Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a ''living document.'' Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation.

  11. Waste Isolation Pilot Plant land management plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands {open_quotes}{hor_ellipsis}are withdrawn from all forms of entry, appropriation, and disposal under the public land laws{hor_ellipsis}{close_quotes}and are reserved for the use of the Secretary of Energy {open_quotes}{hor_ellipsis}for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.{close_quotes}. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW).

  12. Waste Isolation Pilot Plant land management plan

    International Nuclear Information System (INIS)

    1996-01-01

    On October 30, 1992, the WIPP Land Withdrawal Act became law. This Act transferred the responsibility for the management of the WIPP Land Withdrawal Area (WILWA) from the Secretary of the Interior to the Secretary of Energy. In accordance with sections 3(a)(1) and (3) of the Act, these lands open-quotes hor-ellipsis are withdrawn from all forms of entry, appropriation, and disposal under the public land laws hor-ellipsis close quotesand are reserved for the use of the Secretary of Energy open-quotes hor-ellipsis for the construction, experimentation, operation, repair and maintenance, disposal, shutdown, monitoring, decommissioning, and other activities, associated with the purposes of WIPP as set forth in the Department of Energy National Security and Military Applications of Nuclear Energy Act of 1980 and this Act.close quotes. As a complement to this LMP, a MOU has been executed between the DOE and the BLM, as required by section 4(d) of the Act. The state of New Mexico was consulted in the development of the MOU and the associated Statement of Work (SOW)

  13. Key Customer Relationship Management and Service Delivery Plan : case: Service Methodology Plan

    OpenAIRE

    Toikka, Minna

    2012-01-01

    This thesis was commissioned by Company X. The purpose of this thesis was to study the usage of a service process plan, Service Methodology, a globally consistent value and service delivery methodology used throughout Company X Corporation. More specifically, this study focused on investigating the usage of Service Methodology in Company X and how well the account managers using it were adapting to the new service plan. The study is divided into two parts. The first part deals with resear...

  14. Systems engineering management plan for the Salt Repository Project

    International Nuclear Information System (INIS)

    Neff, J.O.

    1986-08-01

    This document presents the plan for using systems engineering in conducting and managing the technical work of the Salt Repository Project (SRP) of the US Department of Energy's Civilian Radioactive Waste Management Program. The need for preparing a Systems Engineering Management Plan (SEMP) is traced back to relevant DOE directives. These directives are interpreted as SRP requirements in the context of the Mined Geologic Disposal System. The strategy for conducting systems engineering on the SRP, including the role of the systems engineering process, is then described. The SEMP also designates who in the project organization will be responsible for carrying out the activities. Finally, the management tools that are used to implement the systems engineering process, including associated documentation on the SRP, are described

  15. Therapeutic risk management of the suicidal patient: safety planning.

    Science.gov (United States)

    Matarazzo, Bridget B; Homaifar, Beeta Y; Wortzel, Hal S

    2014-05-01

    This column is the fourth in a series describing a model for therapeutic risk management of the suicidal patient. Previous columns presented an overview of the therapeutic risk management model, provided recommendations for how to augment risk assessment using structured assessments, and discussed the importance of risk stratification in terms of both severity and temporality. This final column in the series discusses the safety planning intervention as a critical component of therapeutic risk management of suicide risk. We first present concerns related to the relatively common practice of using no-suicide contracts to manage risk. We then present the safety planning intervention as an alternative approach and provide recommendations for how to use this innovative strategy to therapeutically mitigate risk in the suicidal patient.

  16. Investigation-Derived Waste Management Plan. Revision 2

    International Nuclear Information System (INIS)

    Molen, G.

    1995-01-01

    SRS has implemented a comprehensive environmental program to maintain compliance with environmental regulations and mitigate impacts to the environment. One element of the environmental program is the investigation of inactive waste units. Environmental Investigation-Derived Waste (IDW). IDW may include purge water , soil cuttings, drilling fluids, well pumping test and development water, decontamination solutions, contaminated equipment, and personal protection equipment (PPE). In cases where investigations confirm the presence of contamination and the IDW contains waste constituents in concentrations high enough to be of environmental or health concern, special management procedures are warranted. This IDW Management Plan describes specific SRS initiatives for IDW management. The goal is the development of a plan for prudent management of IDW from environmental investigations that is protective of human health and the environment

  17. Screening criteria for siting waste management facilities: Regional Management Plan

    International Nuclear Information System (INIS)

    1986-01-01

    The Midwest Interstate Low-Level Radioactive Waste Commission (Midwest Compact) seeks to define and place into operation a system for low-level waste management that will protect the public health and safety and the environment from the time the waste leaves its point of origin. Once the system is defined it will be necessary to find suitable sites for the components of that waste management system. The procedure for siting waste management facilities that have been chosen by the compact is one in which a host state is chosen for each facility. The host state is then given the freedom to select the site. Sites will be needed of low-level waste disposal facilities. Depending on the nature of the waste management system chosen by the host state, sites may also be needed for regional waste treatment facilities, such as compactors or incinerators. This report provides example criteria for use in selecting sites for low-level radioactive waste treatment and disposal facilities. 14 refs

  18. Project management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    Science.gov (United States)

    2010-12-01

    The Dallas Integrated Corridor Management System Demonstration Project is a multi-agency, de-centralized operation which will utilize a set of : regional systems to integrate the operations of the corridor. The purpose of the Dallas ICM System is to ...

  19. Advanced Hybrid Particulate Collector Project Management Plan

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.J.

    1995-11-01

    As the consumption of energy increases, its impact on ambient air quality has become a significant concern. Recent studies indicate that fine particles from coal combustion cause health problems as well as atmospheric visibility impairment. These problems are further compounded by the concentration of hazardous trace elements such as mercury, cadmium, selenium, and arsenic in fine particles. Therefore, a current need exists to develop superior, but economical, methods to control emissions of fine particles. Since most of the toxic metals present in coal will be in particulate form, a high level of fine- particle collection appears to be the best method of overall air toxics control. However, over 50% of mercury and a portion of selenium emissions are in vapor form and cannot be collected in particulate control devices. Therefore, this project will focus on developing technology not only to provide ultrahigh collection efficiency of particulate air toxic emissions, but also to capture vapor- phase trace metals such as mercury and selenium. Currently, the primary state-of-the-art technologies for particulate control are fabric filters (baghouses) and electrostatic precipitators (ESPs). However, they both have limitations that prevent them from achieving ultrahigh collection of fine particulate matter and vapor-phase trace metals. The objective of this project is to develop a highly reliable advanced hybrid particulate collector (AHPC) that can provide > 99.99 % particulate collection efficiency for all particle sizes between 0.01 and 50 14m, is applicable for use with all U.S. coals, and is cost-0443competitive with existing technologies. Phase I of the project is organized into three tasks: Task I - Project Management, Reporting, and Subcontract Consulting Task 2 - Modeling, Design, and Construction of 200-acfm AHPC Model Task 3 - Experimental Testing and Subcontract Consulting

  20. Integrating fire management into land management planning for west-side forests

    Science.gov (United States)

    Peter D. Teensma

    1996-01-01

    Fire management's integration into land management planning is critical to the successful management of nearly all wildland ecosystems, including westside forests, which lie west of the Cascade crest in Oregon and the northern coastal ranges in California. Restoration and maintenance of fire as an ecosystem process is critical to retention of biological diversity...