  1. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites (EPA, 1987). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 Public Law (PL) 95-604 (PL 95-604), the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined that for Slick Rock, this assessment shall include hydrogeologic site characterization for two separate uranium processing sites, the Union Carbide (UC) site and the North Continent (NC) site, and for the proposed Burro Canyon disposal site

  2. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites (40 CFR 192). The US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. This document contains appendices to Attachment 3, Groundwater Hydrology Report included are calculations

  3. Revegetation and rock cover for stabilization of inactive uranium mill tailings disposal sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Beedlow, P.A.

    1984-05-01

    Guidelines for using vegetation and rock to protect inactive uranium mill tailings from erosion were developed by Pacific Northwest Laboratory as part of the Department of Energy's Uranium Mill Tailings Remedial Action Project (UMTRAP) Technology Development program. Information on soils, climate, and vegetation were collected for 20 inactive tailings sites in the western United States. Sites were grouped according to similarities in climate and vegetation. Soil loss for those sites was characterized using the Universal Soil Loss Equation. Test plots were used to evaluate (1) the interaction between vegetation and sealant barrier systems and (2) the effects of surface rock on soil water and vegetation. Lysimeter and simulation studies were used to direct and support field experiments. 49 references, 17 figures, 16 tables.

  4. Revegetation and rock cover for stabilization of inactive uranium mill tailings disposal sites. Final report

    International Nuclear Information System (INIS)

    Beedlow, P.A.

    1984-05-01

    Guidelines for using vegetation and rock to protect inactive uranium mill tailings from erosion were developed by Pacific Northwest Laboratory as part of the Department of Energy's Uranium Mill Tailings Remedial Action Project (UMTRAP) Technology Development program. Information on soils, climate, and vegetation were collected for 20 inactive tailings sites in the western United States. Sites were grouped according to similarities in climate and vegetation. Soil loss for those sites was characterized using the Universal Soil Loss Equation. Test plots were used to evaluate (1) the interaction between vegetation and sealant barrier systems and (2) the effects of surface rock on soil water and vegetation. Lysimeter and simulation studies were used to direct and support field experiments. 49 references, 17 figures, 16 tables

  5. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas

    International Nuclear Information System (INIS)

    Chernoff, A.R.; Lacker, D.K.

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  6. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1991-12-01

    The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose. First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado

  7. Radiation pathways and potential health impacts from inactive uranium mill tailings

    International Nuclear Information System (INIS)

    1978-07-01

    Radiation exposure pathways and potential health impacts were estimated as part of the evaluation of radioactive uranium mill tailings at the sites of inactive mills in eight western states. The purpose of this report is to describe in detail the methodology used in performing the pathway analysis and health effects estimations. In addition, specific parameters are presented for each of the 22 uranium mill sites that were evaluated. A computer program, RADAD, developed as part of this program, is described and listed

  8. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report

    International Nuclear Information System (INIS)

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources

  9. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  10. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 3, Groundwater hydrology report. Revised final report

    Energy Technology Data Exchange (ETDEWEB)

    1991-12-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites. According to the Uranium Mill Tailings Radiation Control Act of 1978, (UMTRCA) the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined this assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Characterization of the hydrogeologic environment; characterization of existing groundwater quality; definition of physical and chemical characteristics of the potential contaminant source; and description of local water resources.

  11. Comment and response document for the final remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-05-01

    This document for the final remedial action plan and site design has been prepared for US Department of Energy Environmental Restoration Division as part of the Uranium Mill Tailings Remedial Action plan. Comments and responses are included for the site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

  12. Implications of an assessment of potential organic contamination of ground water at an inactive uranium mill

    International Nuclear Information System (INIS)

    Price, J.B.

    1986-01-01

    Laws and regulations concerning remedial actions at inactive uranium mills explicitly recognize radiological and nonradiological hazards and may implicitly recognize the potential presence of hazardous wastes at these mill sites. Ground-water studies at the sites have placed an increasing emphasis on screening for priority pollutants. The Grand Junction, Colorado, mill site was deemed to have a high potential for the presence of organic compounds in ground water, and was chosen as a prototype for assessing the presence of organic compounds in ground water at inactive sites. Lessons learned from the assessment of organics at the Grand Junction site were used to develop a screening procedure for other inactive mill sites

  13. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho

    International Nuclear Information System (INIS)

    1991-09-01

    The US Environmental Protection Agency (EPA) has established health and environmental regulations to correct and prevent groundwater contamination resulting from former uranium processing activities at inactive uranium processing sites (40 CFR 192). According to the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has decided that each assessment shall include information on hydrogeologic site characterization. The water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards is presented in Attachment 4. Site characterization activities discussed in this section include: Definition of the hydrogeologic characteristics of the environment, including hydrostratigraphy, aquifer parameters, areas of aquifer recharge and discharge, potentiometric surfaces, and groundwater velocities. Definition of background groundwater quality and comparison with the proposed EPA groundwater protection standards. Evaluation of the physical and chemical characteristics of the contaminant source and/or residual radioactive materials. Definition of existing groundwater contamination by comparison with the EPA groundwater protection standards. Description of the geochemical processes that affect the downward migration of the source contaminants at the processing site. Description of water resource utilization, including availability, current and future use and value, and alternate water supplies

  14. Comments and responses on the Remedial Action Plan and site design for stabilization of the Inactive Uranium Mill Tailings Site, Grand Junction, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report contains information concerning public comments and responses on the remedial action plan and site design for stabilization of the inactive uranium mill tailings site in Grand Junction, Colorado

  15. Summary of the engineering assessment of inactive uranium mill tailings. Vitro site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1981-04-01

    This report is a summary of a parent report (issued under separate cover) entitled Engineering Assessment of Inactive Uranium Mill Tailings for Vitro Site, Salt Lake City, Utah. Bacon and Davis Utah Inc. has reevaluated the Vitro site in order to revise the April 1976 assessment of the problems resulting from the existence of radioactive uranium mill tailings at Salt Lake City, Utah. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Vitro site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option 1), to removal of the tailings to remote disposal sites, and decontamination of the tailings site (Options II through IV). Cost estimates for the four options range from about $36,400,000 for stabilization in-place, to about $91,000,000 for disposal at a distance of about 85 mi. Three principal alternatives for the reprocessing of the Vitro tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $130/lb by conventional plant processes. Spot market price for uranium was $28.00 in November 1980. Therefore, reprocessing the tailings for uranium recovery appears to be economically unattractive at present

  16. Radium-226 in vegetation and substrates at inactive uranium mill sites

    Energy Technology Data Exchange (ETDEWEB)

    Marple, M.L.

    1980-01-01

    Results of a study of the content of radium-226 in plants growing on inactive uranium mill tailings sites in the Four Corners Region of the southwestern United States and in plants grown under greenhouse conditions with minimal surficial contamination are reported. Field plant samples and associated substrates were analyzed from two carbonate tailings sites in the Grants Mineral Belt of New Mexico. Radium activities in air-cleaned samples ranged from 5 to 368 pCi/g (dry weight) depending on species and location: activities in plants growing on local soils averaged 1.0 pCi/g. The talings and local soils contain 140 to 1400 pCi/g and 2.1 pCi/g, respectively. An evaluation of cleaning methods on selected samples showed that from 17 to 79% of the radium activity measured in air-cleaned samples was due to surficial contamination, which varied with species and location. A survey of 18 inactive uranium mill sites in the Four Corners Region was performed. Radium activity in plant tissues from nine species ranged from 2 to 210 pCi/g on bare tailings and from 0.3 to 30 pCi/g on covered tailings The radium content in most of the soil overburdens on the covered tailings piles was 10 to 17 pCi/g. An experiment was performed to measure radium-226 uptake by two species grown on tailings covered with a shallow (5 cm) soil layer. A grass, Sporobolus airoides (alkali sacaton) and a shrub, Atriplex canescens (four-wing saltbush), were studied. The tailings were a mixture of sands and slimes from a carbonate pile. The tailings treatments were plants grown in a soil cover over tailings; the controls were plants grown only in soil. Three soil types, dune sand, clay loam, and loam, were used. The radium activity of the plant tissue from the tailings treatment compared to that of the appropriate control was 1 to 19 times greater for the grass and 4 to 27 times greater for the shrub.

  17. Radium-226 in vegetation and substrates at inactive uranium mill sites

    International Nuclear Information System (INIS)

    Marple, M.L.

    1980-01-01

    Results of a study of the content of radium-226 in plants growing on inactive uranium mill tailings sites in the Four Corners Region of the southwestern United States and in plants grown under greenhouse conditions with minimal surficial contamination are reported. Field plant samples and associated substrates were analyzed from two carbonate tailings sites in the Grants Mineral Belt of New Mexico. Radium activities in air-cleaned samples ranged from 5 to 368 pCi/g (dry weight) depending on species and location: activities in plants growing on local soils averaged 1.0 pCi/g. The talings and local soils contain 140 to 1400 pCi/g and 2.1 pCi/g, respectively. An evaluation of cleaning methods on selected samples showed that from 17 to 79% of the radium activity measured in air-cleaned samples was due to surficial contamination, which varied with species and location. A survey of 18 inactive uranium mill sites in the Four Corners Region was performed. Radium activity in plant tissues from nine species ranged from 2 to 210 pCi/g on bare tailings and from 0.3 to 30 pCi/g on covered tailings The radium content in most of the soil overburdens on the covered tailings piles was 10 to 17 pCi/g. An experiment was performed to measure radium-226 uptake by two species grown on tailings covered with a shallow (5 cm) soil layer. A grass, Sporobolus airoides (alkali sacaton) and a shrub, Atriplex canescens (four-wing saltbush), were studied. The tailings were a mixture of sands and slimes from a carbonate pile. The tailings treatments were plants grown in a soil cover over tailings; the controls were plants grown only in soil. Three soil types, dune sand, clay loam, and loam, were used. The radium activity of the plant tissue from the tailings treatment compared to that of the appropriate control was 1 to 19 times greater for the grass and 4 to 27 times greater for the shrub

  18. Description of radiological problems at inactive uranium mill sites and formerly utilized MED/AEC sites

    International Nuclear Information System (INIS)

    Jacobs, D.G.; Dickson, H.W.

    1979-02-01

    During the early years of development of the nuclear program in the United States, more than a hundred sites were used by the Manhattan Engineer District (MED), and the U.S. Atomic Energy Commission (AEC), and/or its uranium suppliers. Many of these sites are no longer used for such activities, but in many cases, the real estate remains contaminated with radioactivity and can be a potential source of exposure to members of the general public. In addition, 22 inactive uranium mill tailings sites exist in the western part of the United States. Radioactive contamination conditions range from slight contamination on the surfaces of buildings and equipment to extensive contamination of the subsoil. The Department of Energy is conducting a program to assure that adequate precautions are taken in the management of these properties to provide the cost-effective protection of public health while permitting further use of land and other resources. Several issues which should be considered in the development of an effective policy for long-term management of such properties are identified

  19. Description of radiological problems at inactive uranium mill sites and formerly utilized MED/AEC sites

    Energy Technology Data Exchange (ETDEWEB)

    Jacobs, D.G.; Dickson, H.W.

    1979-02-01

    During the early years of development of the nuclear program in the United States, more than a hundred sites were used by the Manhattan Engineer District (MED), and the U.S. Atomic Energy Commission (AEC), and/or its uranium suppliers. Many of these sites are no longer used for such activities, but in many cases, the real estate remains contaminated with radioactivity and can be a potential source of exposure to members of the general public. In addition, 22 inactive uranium mill tailings sites exist in the western part of the United States. Radioactive contamination conditions range from slight contamination on the surfaces of buildings and equipment to extensive contamination of the subsoil. The Department of Energy is conducting a program to assure that adequate precautions are taken in the management of these properties to provide the cost-effective protection of public health while permitting further use of land and other resources. Several issues which should be considered in the development of an effective policy for long-term management of such properties are identified.

  20. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    International Nuclear Information System (INIS)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions

  1. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Appendix D, Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two designated inactive uranium mill tailings sites near Rifle, Colorado, and the proposed disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  2. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lowman, Idaho: Remedial action selection report for the Lowman UMTRA project site, Idaho

    International Nuclear Information System (INIS)

    Matthews, M.L.; Nagel, J.

    1991-09-01

    The inactive uranium mill tailings site near Lowman, Idaho, was designated as one of 24 abandoned uranium tailings sites to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan and certify that the remedial action complies with the standards promulgated by the US Environmental Protection Agency (EPA). The remedial action plan (RAP), which includes this remedial action selection report (RAS), has been developed to serve a two-fold purpose. First, it describes the activities that are proposed by the DOE to accomplish long-term stabilization and control of residual radioactive materials at the inactive uranium processing site near Lowman, Idaho. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Idaho, and the NRC, becomes Appendix B of the Cooperative Agreement (No. DE-FC04-85AL20535) between the DOE and the State of Idaho

  3. Radiological survey of the inactive uranium-mill tailings at Rifle, Colorado

    International Nuclear Information System (INIS)

    Haywood, F.F.; Jacobs, D.J.; Ellis, B.S.; Hubbard, H.M. Jr.; Shinpaugh, W.H.

    1980-06-01

    Results of radiological surveys of two inactive uranium-mill sites near Rifle, Colorado, in May 1976 are presented. These sites are referred to as Old Rifle and New Rifle. The calculated 226 Ra inventory of the latter site is much higher than at the older mill location. Data on above-ground measurements of gamma exposure rates, surface and near-surface concentration of 226 Ra in soil and sediment samples, concentration of 226 Ra in water, calculated subsurface distribution of 226 Ra, and particulate radionuclide concentrations in air samples are given. The data serve to define the extent of contamination in the vicinity of the mill sites and their immediate surrounding areas with tailings particles. Results of these measurements were utilized as technical input for an engineering assessment of these two sites

  4. Annual status report on the inactive uranium mill tailings sites remedial action program

    Energy Technology Data Exchange (ETDEWEB)

    1979-12-01

    Assessments of inactive uranium mill tailings sites in the United States led to the designation of 25 processing sites for remedial action under the provisions of Section 102(a) Public Law 95-604. The Department of Energy assessed the potential health effects to the public from the residual radioactive materials on or near the 25 sites; and, with the advice of the Environmental Protection Agency, the Secretary established priorities for performing remedial action. In designating the 25 sites and establishing the priorities for performing remedial action, the Department of Energy consulted with the Environmental Protection Agency, Nuclear Regulatory Commission, Department of the Interior, governors of the affected States, Navajo Nation, and appropriate property owners. Public participation in this process was encouraged. During Fiscal Year 1980, Department of Energy will be conducting surveys to verify the radiological characterization at the designated processing sites; developing cooperative agreements with the affected States; and initiating the appropriate National Environmental Policy Act documentation prior to conducting specific remedial actions.

  5. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent groundwater contamination resulting from processing activities at inactive uranium milling sites (40 CFR 192). The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 designated responsibility to the US Department of Energy (DOE) for assessing the inactive uranium milling sites. The DOE has determined that each assessment shall include information on site characterization, a description of the proposed action, and a summary of the water resources protection strategy that describes how the proposed action will comply with the EPA groundwater protection standards. To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards, the US Department of Energy (DOE) proposes that supplemental standards be applied at the Dry Flats disposal site because of Class III (limited use) groundwater in the uppermost aquifer (the basal sandstone of the Cretaceous Burro Canyon Formation) based on low yield. The proposed remedial action will ensure protection of human health and the environment

  6. Radiological survey of the inactive uranium-mill tailings at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    Haywood, F.F.; Perdue, P.T.; Chou, K.D.; Ellis, B.S.

    1980-06-01

    Results of a radiological survey of two inactive mill sites near Slick Rock, Colorado, in April 1976 are presented. One mill, referred to in this report as North Continent (NC), was operated primarily for recovery of radium and vanadium and, only briefly, uranium. The Union Carbide Corporation (UCC) mill produced a uranium concentrate for processing elsewhere and, although low-level contamination with 226 Ra was widespread at this site, the concentration of this nuclide in tailings was much lower than at the NC site. The latter site also has an area with a high above-ground gamma dose rate (2700 μR/hr) and a high-surface 226 Ra concentration (5800 pCi/g). This area, which is believed to have been a liquid disposal location during plant operations, is contained within a fence. A solid disposal area outside the present fence contains miscellaneous contaminated debris. The estimated concentration of 226 Ra as a function of depth, based on gamma hole-logging data, is presented for 27 holes drilled at the two sites

  7. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado. Volume 2, Appendices D and E: Final report

    Energy Technology Data Exchange (ETDEWEB)

    1992-02-01

    This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.

  8. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Attachment 3, Ground water hydrology report: Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-04

    The US Environmental Protection Agency (EPA) has established health and environmental protection regulations to correct and prevent ground water contamination resulting from processing activities at inactive uranium milling sites (52 FR 36000 (1987)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, 42 USC {section}7901 et seq., the US Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has determined that for Slick Rock, this assessment shall include hydrogeologic site characterization for two separate uranium processing sites, the Union Carbide (UC) site and the North Continent (NC) site, and for the proposed Burro Canyon disposal site. The water resources protection strategy that describes how the proposed action will comply with the EPA ground water protection standards is presented in Attachment 4. The following site characterization activities are discussed in this attachment: Characterization of the hydrogeologic environment, including hydrostratigraphy, ground water occurrence, aquifer parameters, and areas of recharge and discharge. Characterization of existing ground water quality by comparison with background water quality and the maximum concentration limits (MCL) of the proposed EPA ground water protection standards. Definition of physical and chemical characteristics of the potential contaminant source, including concentration and leachability of the source in relation to migration in ground water and hydraulically connected surface water. Description of local water resources, including current and future use, availability, and alternative supplies.

  9. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1993-08-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this document and the rest of the RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the State of Colorado

  10. Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U 3 O 8 by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado. Final report

    International Nuclear Information System (INIS)

    1996-08-01

    This document contains the page changes for Attachment 3, Ground Water Hydrology Report dated August, 1996 for the Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings at Slick Rock, Colorado. This portion of Attachment 3 contains the Table of Contents pages i and ii, and pages numbered 3-3 through 3-56 of the Ground Water Hydrology Report. Also included are the cover sheets for Appendix A, B, and C to Attachment 3

  12. An ecological approach to the assessment of vegetation cover on inactive uranium mill tailings sites

    International Nuclear Information System (INIS)

    Kalin, M.; Caza, C.

    1982-01-01

    Vascular plants have been collected from abandoned or inactive uranium mill tailings in three mining areas in Canada. The collection was evaluated to determine some characteristics of vegetation development and to identify the plants which will persist on the sites. A total of 170 species were identified. Many of the species are widely distributed in North America, none has been reported as rare in any of the locations from which they were collected. Species richness was highest on Bancroft sites and lowest on Uranium City sites, though values were variable between sites. Forty-four per cent of the total number of species were found on only a single site. Only seven species occurred on more than half of the tailings sites and in all three mining areas. There was no difference between amended and unamended sites in terms of either species richness or species composition. There was no apparent relationship between species richness and either site size, site age or amendment history. The results of this survey suggest that the uranium mill tailings sites are at an early stage of colonization where the seed input from surrounding areas and the heterogeneity of the sites are factors determining species composition and species richness. The fate of an individual once it has reached the site will be determined by its ability to establish on the sites. A perennial growth habit and the ability to expand clonally are important characteristics of the species on the tailings. The species on the tailings are commonly found in a variety of habitats. Consistent with the observation that the tailings sites are at a stage of early colonization, we find that the few species widely distributed across sites are all characteristic pioneering species with wide environmental tolerances. These species included Populus tremuloides, P. balsamifera, Scirpus cyperinus, Equisetum arvense, Betula papyrifera, Achillea millefolium and Typha spp. The vegetation on the tailings is likely to be

  13. Remedial action standards for inactive uranium processing sites (40 cfr 192). Draft environmental impact statement

    International Nuclear Information System (INIS)

    1980-12-01

    The Environmental Protection Agency is proposing standards for disposing of uranium mill tailings from inactive processing sites and for cleaning up contaminated open land and buildings. These standards were developed pursuant to the Uranium Mill Tailings Radiation Control Act of 1978 (Public Law 95-604). This Act requires EPA to promulgate standards to protect the environment and public health and safety from radioactive and nonradioactive hazards posed by uranium mill tailings at designated inactive processing sites. The Draft Environmental Impact Statement examines health, technical, cost, and other factors relevant to determining standards. The proposed standards for disposal of the tailings piles cover radon emissions from the tailings to the air, protection of surface and ground water from radioactive and nonradioactive contaminants, and the length of time the disposal system should provide a reasonable expectation of meeting these standards. The proposed cleanup standards limit indoor radon decay product concentrations and gamma radiation levels and the residual radium concentration of contaminated land after cleanup

  14. Engineering assessment of inactive uranium mill tailings, Shiprock site, Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1981-07-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Shiprock site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.5 million dry tons of tailings at the Shiprock site constitutes the most significant environental impact, although windblown tailings and external gamma radiation also are factors. The eight alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $13,400,000 for stabilization in place to about $37,900,000 for disposal at a distance of about 16 miles. Three principal alternatives for the reprocessing of the Shiprock tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $230/lb by heap leach and $250/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive

  15. Evaluation of health risks associated with proposed ground water standards at selected inactive uranium mill-tailings sites

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Medeiros, W.H.; Meinhold, A.; Morris, S.C.; Moskowitz, P.D.; Nagy, J.; Lackey, K.

    1989-04-01

    The US Environmental Protection Agency (EPA) has proposed ground water standards applicable to all inactive uranium mill-tailings sites. The proposed standards include maximum concentration limits (MCL) for currently regulated drinking water contaminants, as well as the addition of standards for molybdenum, uranium, nitrate, and radium-226 plus radium-228. The proposed standards define the point of compliance to be everywhere downgradient of the tailings pile, and require ground water remediation to drinking water standards if MCLs are exceeded. This document presents a preliminary description of the Phase 2 efforts. The potential risks and hazards at Gunnison, Colorado and Lakeview, Oregon were estimated to demonstrate the need for a risk assessment and the usefulness of a cost-benefit approach in setting supplemental standards and determining the need for and level of restoration at UMTRA sites. 8 refs., 12 tabs

  16. Evaluation of health risks associated with proposed ground water standards at selected inactive uranium mill-tailings sites

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Medeiros, W.H.; Meinhold, A.; Morris, S.C.; Moskowitz, P.D.; Nagy, J.; Lackey, K.

    1989-04-01

    The US Environmental Protection Agency (EPA) has proposed ground water standards applicable to all inactive uranium mill-tailings sites. The proposed standards include maximum concentration limits (MCL) for currently regulated drinking water contaminants, as well as the addition of standards for molybdenum, uranium, nitrate, and radium-226 plus radium-228. The proposed standards define the point of compliance to be everywhere downgradient of the tailings pile, and require ground water remediation to drinking water standards if MCLs are exceeded. This document presents a preliminary description of the Phase 2 efforts. The potential risks and hazards at Gunnison, Colorado and Lakeview, Oregon were estimated to demonstrate the need for a risk assessment and the usefulness of a cost-benefit approach in setting supplemental standards and determining the need for and level of restoration at UMTRA sites. 8 refs., 12 tabs.

  17. Assessment of the radiological impact of the inactive uranium-mill tailings at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Haywood, F.F.; Goldsmith, W.A.; Jacobs, D.G.; Perdue, P.T.; Ellis, B.S.; Hubbard, H.M. Jr.; Shinpaugh, W.H.

    1980-04-01

    Results of a radiological survey of the inactive uranium-mill site at Grand Junction, Colorado, made in May and June 1976, are presented along with descriptions of techniques and equipment used to obtain the data and an assessment of increased risk of health effects attributable to radiation and radionuclides from the tailings. An estimate of potential health effects of exposure to gamma rays around a former mill building and to radon daughters produced by radon dispersed from the tailings has been made for occupants of the site

  18. Engineering assessment of inactive uranium mill tailings: Maybell Site, Maybell, Colorado. Summary

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Maybell site in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The two alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to disposal of the tailings in a nearby open pit mine and decontamination of the tailings site (Option II). Cost estimates for the two options are about $11,700,000 for stabilization in-place and about $22,700,000 for disposal within a distance of 2 mi. Three principal alternatives for the reprocessing of the Maybell tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $125 and $165/lb of U 3 O 8 by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present

  19. Engineering assessment of inactive uranium mill tailings, Durango Site, Durango, Colorado

    International Nuclear Information System (INIS)

    1981-06-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Durango site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the nearly 1.6 million tons of tailings at the Durango site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the seven options range from about $10,700,000 for stabilization in-place, to about $21,800,000 for disposal at a distance of about 10 mi. Three principal alternatives for the reprocessing of the Durango tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $30/lb U 3 O 8 by either heap leach or conventional plant processes

  20. Engineering assessment of inactive uranium mill tailings, Gunnison Site, Gunnison, Colorado: summary

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Gunnison site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Gunnison, Colorado. This evaluation has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the ivnvestigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the combined 540,000 dry tons of tailings and the 435,400 tons of contaminated waste at the Gunnison site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The 10 alternative actions presented in this engineering assessment range from stabilization of the site in its present location with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to disposal sites along with decontamination of the Gunnison site (Options II through X). Cost estimates for the 10 options range from about $8,900,000 for stabilization in-place, to about $14,000,000 for disposal in the North Alkali Creek area at a distance of about 18 mi. Truck haulage would be used to transport the tailings and contaminated materials from the Gunnison site to the selected disposal site. Three principal alternatives for the reprocessing of the Gunnison tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocesssing. The cost of the uranium recovered would be about $250 and $230/lb of U 3 O 8 by heap leach and conventional plant processes, respectively. The spot market price for uranium was $25/lb early in 1981

  1. Engineering assessment of inactive uranium mill tailings. Vitro site, Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1981-04-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Vitro site in order to revise the April 1976 assessment of the problems resulting from the existence of radioactive uranium mill tailings at Salt Lake City, Utah. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Vitro site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites, and decontamination of the tailings site (Options II through IV). Cost estimates for the four options range from about $36,400,000 for stabilization in-place, to about $91,000,000 for disposal at a distance of about 85 mi. Three principal alternatives for the reprocessing of the Vitro tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $130/lb by conventional plant processes. Spot market price for uranium was $28.00 in November 1980. Therefore, reprocessing the tailings for uranium recovery appears to be economically unattractive at present

  2. Reclamation plans at uranium mill tailings sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.

    1990-01-01

    Long-term stability of waste impoundments is of concern because of the long time periods over which various types of waste may remain active. Over the past decade much technology has been developed specifically for reclamation of uranium mill tailings impoundments. Aspects of this technology will be discussed here and is presented as also being directly applicable to reclamation of industrial waste impoundments in general. The paper discusses Title I and Title II sites which represent two different generations in uranium tailings impoundment construction. The comparison between the two represent differences in philosophies as well as in impoundment type. Reclamation of uranium mill tailings impoundments in the U.S. is controlled by Federal legislation, which has set forth the regulatory framework for reclamation plan approval. Title I requirements govern government owned inactive sites and Title II requirements govern active tailings impoundments or those operated by private industries. While the Title I and Title II designation may result in a slightly different regulatory process, reclamation of uranium tailings sites has the same. Differences between Title I and Title II reclamation plans to achieve surface stability relate primarily to the embankment and surface covers. The differences in the cover designs result from site-specific conditions, rather than from differences in engineering approaches or the regulatory process. This paper discusses the site-specific conditions that affect the selection of cover designs, and provides a comparative example to illustrate the effect of this condition

  3. Contaminant transport, revegetation, and trace element studies at inactive uranium mill tailings piles

    International Nuclear Information System (INIS)

    Dreesen, D.R.; Marple, M.L.; Kelley, N.E.

    1978-01-01

    The stabilization of inactive uranium mill tailings piles is presently under study. These studies have included investigations of stabilizing tailings by attempting to establish native vegetation without applying irrigation. Examination of processes which transport tailings or associated contaminants into the environment has been undertaken to better understand the containment provided by various stabilization methods. The uptake of toxic trace elements and radionuclides by vegetation has been examined as a mechanism of contaminant transport. The source terms of 222 Rn from inactive piles have been determined as well as the attenuation of radon flux provided by shallow soil covers. The possibility of shallow ground water contamination around an inactive pile has been examined to determine the significance of ground water transport as a mode of contaminant migration. The rationale in support of trace element studies related to uranium milling activities is presented including the enrichment, migration, and toxicities of trace elements often associated with uranium deposits. Some concepts for the stabilization of inactive piles are presented to extrapolate from research findings to practical applications. 25 references, 8 tables

  4. Engineering assessment of inactive uranium mill tailings: Slick Rock sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah, Inc., has reevaluated the Slick Rock sites in order to revise the October 1977 engineering radioactive uranium mill tailings at Slick Rock, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 387,000 tons of tailings at the Slick Rock sites constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The five alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material, consolidation of the piles, and removal of the tailings to remote disposal sites and decontamination of the tailings sites. Cost estimates for the five options range from about $6,800,000 for stabilization in-place, to about $11,000,000 for disposal at a distance of about 6.5 mi. Three principal alternatives for the reprocessing of the Slick Rock tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be over $800/lb of U 3 O 8 whether by conventional or heap leach plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present, nor for the foreseeable future

  5. Engineering assessment of inactive uranium mill tailings: Slick Rock sites, Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-09-01

    Ford, Bacon and Davis Utah, Inc., has reevaluated the Slick Rock sites in order to revise the October 1977 engineering radioactive uranium mill tailings at Slick Rock, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 387,000 tons of tailings at the Slick Rock sites constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The five alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material, consolidation of the piles, and removal of the tailings to remote disposal sites and decontamination of the tailings sites. Cost estimates for the five options range from about $6,800,000 for stabilization in-place, to about $11,000,000 for disposal at a distance of about 6.5 mi. Three principal alternatives for the reprocessing of the Slick Rock tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be over $800/lb of U/sub 3/O/sub 8/ whether by conventional or heap leach plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present, nor for the foreseeable future.

  6. Engineering assessment of inactive uranium mill tailings: Mexican Hat Site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Mexican Hat site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Mexican Hat, Utah. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.2 million tons of tailings at the Mexican Hat site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $15,200,000 for stabilization in place, to about $45,500,000 for disposal at a distance of about 16 mi. Three principal alternatives for the reprocessing of the Mexican Hat tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $115/lb of U 3 O 8 whether by heap leach or conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Mexican Hat tailings for uranium recovery is not economically attractive under present conditions

  7. Background report for the uranium-mill-tailings-sites remedial-action program

    International Nuclear Information System (INIS)

    1981-04-01

    The Uranium Mill Tailings Radiation Control Act of 1978, Public Law 95-604, mandates remedial action responsibilities to the Department of Energy for designated inactive uranium processing sites. To comply with the mandates of the Act, a program to survey and evaluate the radiological conditions at inactive uranium processing sites and at vicinity properties containing residual radioactive material derived from the sites is being conducted; the Remedial Action Program Office, Office of the Assistant Secretary for Nuclear Energy is implementing remedial actions at these processing sites. This report provides a brief history of the program, a description of the scope of the program, and a set of site-specific summaries for the 22 locations specified in the Act and three additional locations designated in response to Federal Register notices issued on August 17 and September 5, 1979. It is designed to be a quick source of background information on sites covered by the implementation program for Public Law 95-604

  8. Engineering assessment of inactive uranium mill tailings

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    The Grand Junction site has been reevaluated in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented herein range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $10,200,000 for stabilization in-place to about $39,500,000 for disposal in the DeBeque area, at a distance of about 35 mi, using transportation by rail. If transportation to DeBeque were by truck, the cost estimated to be about $41,900,000. Three principal alternatives for the reprocessing of the Grand Junction tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $150/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery appears not to be economically attractive.

  9. Engineering assessment of inactive uranium mill tailings

    International Nuclear Information System (INIS)

    1981-07-01

    The Grand Junction site has been reevaluated in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented herein range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $10,200,000 for stabilization in-place to about $39,500,000 for disposal in the DeBeque area, at a distance of about 35 mi, using transportation by rail. If transportation to DeBeque were by truck, the cost estimated to be about $41,900,000. Three principal alternatives for the reprocessing of the Grand Junction tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $150/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery appears not to be economically attractive

  10. Summary report on reprocessing evaluation of selected inactive uranium mill tailings sites

    International Nuclear Information System (INIS)

    1983-09-01

    Sandia National Laboratories has been assisting the Department of Energy in the Uranium Mill Tailings Remedial Actions Program (UMTRAP) the purpose of which is to implement the provisions of Title I of Public Law 95-604, ''Uranium Mill Tailings Radiation Control Act of 1978.'' As part of this program, there was a need to evaluate the mineral concentration of the residual radioactive materials at some of the designated processing sites to determine whether mineral recovery would be practicable. Accordingly, Sandia contracted Mountain States Research and Development (MSRD), a division of Mountain States Mineral Enterprises, to drill, sample, and test tailings at 12 sites to evaluate the cost of and the revenue that could be derived from mineral recovery. UMTRAP related environmental and engineering sampling and support activities were performed in conjunction with the MSRD operations. This summary report presents a brief description of the various activities in the program and of the data and information obtained and summarizes the results. 8 refs., 9 tabs

  11. Radiological survey of the inactive uranium-mill tailings at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    Haywood, F.F.; Christian, D.J.; Ellis, B.S.; Hubbard, H.M. Jr.; Lorenzo, D.; Shinpaugh, W.H.

    1980-06-01

    The inactive uranium-mill tailings pile at Ambrosia Lake, New Mexico, contains approximately 1520 Ci of 226 Ra in 2.4 million metric tons of tailings covering an area of 43 hectares. All of the former mill buildings were intact and, at the time of this survey, several were in use. The tailings have not been stabilized, but the crusty surface is reported to be resistant to wind erosion. The average gamma-ray exposure rate 1 m above the tailings is 720 μR/h while the average rate in the former mill area is 150 μR/h. The adjacent area, between the mill site, ponds, and tailings pile, has an average exposure rate of 230 μR/h. Gamma radiation measurements outside these areas, as well as the results of analyses of surface or near-surface sediment and soil samples, show fairly wide dispersion of contamination around the site. The subsurface distribution of 226 Ra in 18 holes drilled at the site, calculated from gamma-ray monitoring data, is presented graphically and compared with measured concentrations in two holes

  12. Engineering assessment of inactive uranium mill tailings: Mexican Hat site, Mexican Hat, Utah. Summary

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Mexican Hat site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Mexican Hat, Utah. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.2 million tons of tailings at the Mexican Hat site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $15,200,000 for stabilization in place, to about $45,500,000 for disposal at a distance of about 16 mi. Three principal alternatives for the reprocessing of the Mexican Hat tailings were examined: (a) heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $115/lb of U 3 O 8 whether by heap leach or conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Mexican Hat tailings for uranium recovery is not economically attractive under present conditions

  13. Engineering assessment of inactive uranium mill tailings: Monument Valley Site, Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevalated the Monument Valley site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Monument Valley, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposure of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.1 million tons of tailings at the Monument Valley site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the four options range from about $6,600,000 for stabilization in-place, to about $15,900,000 for disposal at a distance of about 15 mi. Three principal alternatives for reprocessing the Monument Valley tailings were examined: heap leaching; Treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovery is economically unattractive.

  14. Engineering assessment of inactive uranium mill tailings: Monument Valley Site, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevalated the Monument Valley site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Monument Valley, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposure of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.1 million tons of tailings at the Monument Valley site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the four options range from about $6,600,000 for stabilization in-place, to about $15,900,000 for disposal at a distance of about 15 mi. Three principal alternatives for reprocessing the Monument Valley tailings were examined: heap leaching; Treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovery is economically unattractive

  15. Guidelines for cleanup of uranium tailings from inactive mills

    International Nuclear Information System (INIS)

    Goldsmith, W.A.; Haywood, F.F.; Jacobs, D.G.

    1975-01-01

    Recent experiences in Grand Junction, Colorado, have indicated the significance of uranium tailings as sources of nonoccupational exposure and suggest that current methods for perpetual care and isolation of the large areas covered by tailings piles at inactive mill locations may be inadequate for minimizing human exposure. This paper presents the rationale and the procedures used in reviewing the adequacy of proposed criteria for remedial action at these sites. Exposures due to aquatic, terrestrial, airborne, and direct contamination pathways were compared to determine the most important radionuclides in the pile and their pathways to man. It is shown that the most hazardous components of the tailings are 226 Ra and 230 Th. The long half-lives of these radionuclides require the consideration of continuous occupancy of the vacated site at some future time, even if the immediately projected land use does not anticipate maximum exposure

  16. Summary of the engineering assessment of inactive uranium mill tailings, Riverton Site, Riverton, Wyoming

    International Nuclear Information System (INIS)

    1981-08-01

    Ford, Bacon, and Davis Utah Inc. has reevaluated the Riverton site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Riverton, Wyoming. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 900,000 tons of tailings materials at the Riverton site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The nine alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontaminations of the tailings site (Options II through IX). Cost estimates for the nine options range from about $16,600,000 for stabilization in-place, to about $23,200,000 for disposal at a distance of 18 to 25 mi. Three principal alternatives for the reprocessing of the Riverton tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $260 and $230/lb of U 3 O 8 by heap leach and conventional plant processes respectively. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery does not appear to be economically attractive

  17. Engineering assessment of inactive uranium mill tailings. Canonsburg Site, Canonsburg, Pennsylvania

    International Nuclear Information System (INIS)

    1982-04-01

    Ford, Bacon and Davis Utah Inc. has evaluated the Canonsburg site in order to assess the problems resulting from the existence of radioactive residues at Canonsburg, Pennsylvania. This engineering assessment has included the preparation of topographic maps, radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the approximately 300,000 tons of tailings and contaminated soil at the Canonsburg site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings and contaminated materials to a remote disposal site and decontamination of the Canonsburg site (Options II through IV). Cost estimates for the four options range from $23,244,000 for stabilization in-place, to $27,052,000 for disposal at a distance of about 17 mi. Three principal alternatives for the reprocessing of the Canonsburg tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. As required by Public Law 95-604, under whose auspices this project is conducted, the US Department of Energy has solicited expressions of interest in reprocessng the tailings and residues at the Canonsburg site for uranium recovery. Since no such interest was demonstrated, no effort has been made to estimate the value of the residual uranium resource at the Canonsburg site

  18. Remedial action plan and site design for stabilization of the inactive uranium processing site at Naturita, Colorado

    International Nuclear Information System (INIS)

    1994-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which describes the proposed remedial action for the Naturita site. An extensive amount of data and supporting information has been generated and evaluated for this remedial action. These data and supporting information are not incorporated into this single document but are included or referenced in the supporting documents. The RAP consists of this RAS and four supporting documents or attachments. This Attachment 2, Geology Report describes the details of geologic, geomorphic, and seismic conditions at the Dry Flats disposal site

  19. Engineering assessment of inactive uranium mill tailings, Spook site, Converse County, Wyoming. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings was performed at the Spook Site, Converse County, Wyoming. Data are presented from soil, water and other sample analyses, radiometric measurements to determine areas with radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site geology, hydrology, and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 187,000 tons of tailings at the Spook Site constitutes the main environmental impact, which is negligible. The two alternative actions presented are better fencing of the site in its present state and placing tailings and contaminated on-site materials and soil in the open-pit mine and covering the resulting pile with 2 ft of overburden material. The cost estimates for the options are $81,000 and $142,000, respectively. Reprocessing the tailings for uranium at a nearby operating uranium mill is worthy of economic consideration at this time

  20. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    International Nuclear Information System (INIS)

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas

  1. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Falls City, Texas. Remedial action selection report, attachment 2, geology report; attachment 3, groundwater hydrology report; and attachment 4, water resources protection strategy. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-09-01

    The uranium processing site near Falls City, Texas, was one of 24 inactive uranium mill sites designated to be remediated by the U.S. Department of Energy (DOE) under Title I of the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). The UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). The RAP, which includes this summary remedial action selection report (RAS), serves a two-fold purpose. First, it describes the activities proposed by the DOE to accomplish long-term stabilization and control of the residual radioactive materials at the inactive uranium processing site near Falls City, Texas. Second, this document and the remainder of the RAP, upon concurrence and execution by the DOE, the State of Texas, and the NRC, becomes Appendix B of the Cooperative Agreement between the DOE and the State of Texas.

  2. Engineering assessment of inactive uranium mill tailings: Lakeview site, Lakeview, Oregon

    International Nuclear Information System (INIS)

    1981-10-01

    This assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The three alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material (Option I) and removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II and III). Cost estimates range from about $6,000,000 for stabilization in-place, to about $7,500,000 for disposal at a distance of about 10 miles. Three alternatives for reprocessing the Lakeview tailings were examined: heap leaching, treatment at an existing mill, and reprocessing at a new conventional mill. The cost of the uranium recovered would be over $450/lb of U 3 O 8 and hence reprocessing is not economical

  3. Engineering assessment of inactive uranium mill tailings: Lakeview site, Lakeview, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-10-01

    This assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The three alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material (Option I) and removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II and III). Cost estimates range from about $6,000,000 for stabilization in-place, to about $7,500,000 for disposal at a distance of about 10 miles. Three alternatives for reprocessing the Lakeview tailings were examined: heap leaching, treatment at an existing mill, and reprocessing at a new conventional mill. The cost of the uranium recovered would be over $450/lb of U/sub 3/O/sub 8/ and hence reprocessing is not economical.

  4. Radiological survey of the inactive uranium-mill tailings at Gunnison, Colorado

    International Nuclear Information System (INIS)

    Haywood, F.F.; Jacobs, D.G.; Hubbard, H.M. Jr.; Ellis, B.S.; Shinpaugh, W.H.

    1980-03-01

    The findings of a radiological survey of the inactive uranium-mill site at Gunnison, Colorado, conducted in May 1976, are presented. Results of surface soil sample analyses and direct gamma radiation measurements indicate limited spread of tailings off the site. The only significant above background measurements off the site were obtained in an area previously covered by the tailings pile. There was little evidence of contamination of the surface or of unconfined groundwater in the vicinity of the tailings pile; however, the hydrologic conditions at the site indicate a potential for such contamination. The concentration of 226 Ra in all water samples except one from the tailings pile was well below the concentration guide for drinking water. The subsurface distribution of 226 Ra in 14 bore holes located on and around the tailings pile was calculated from gamma ray monitoring data obtained jointly with Ford, Bacon and Davis Utah Inc

  5. Information for consideration in reviewing groundwater protection plans for uranium mill tailings sites

    International Nuclear Information System (INIS)

    Thorne, P.D.

    1992-05-01

    Guidelines and acceptance criteria were developed for reviewing certain aspects of groundwater protection plans for uranium mill tailing sites. The aspects covered include: (1) leaching and long-term releases of hazardous and radioactive constituents from tailings and other contaminated materials, (2) attenuation of hazardous and radioactive constituents in groundwater under saturated and unsaturated conditions, (3) design and implementation of groundwater monitoring programs, (4) design and construction of groundwater protection barriers, and (5) efficiency and effectiveness of groundwater cleanup programs. The objective of these guidelines is to assist the US Nuclear Regulatory Commission staff in reviewing Remedial Action Plans for inactive waste sites and licensing application documents for active commercial uranium and thorium mills

  6. Summary of the engineering assessment of inactive uranium mill tailings, Shiprock Site, Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1981-07-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Shiprock site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.5 million dry tons of tailings at the Shiprock site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The eight alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of the stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through VIII). Cost estimates for the eight options range from about $13,400,000 for stabilization in place to about $37,900,000 for disposal at a distance of about 16 miles. Three principal alternatives for the reprocessing of the Shiprock tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and(c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $230/lb by heap leach and $250/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive

  7. Engineering assessment of inactive uranium mill tailings: Phillips/United Nuclear site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah, Inc., has reevaluated the Phillips/United Nuclear site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ambrosia Lake, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from 2.6 million dry tons of tailings at the Phillips/United Nuclear site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,500,000 for stabilization in-place, to about $45,200,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Phillips/United Nuclear tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing.The cost of the uranium recovered would be about $87/lb of U 3 O 8 by either heap leach or conventional plant process. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Phillips/United Nuclear tailings for uranium recovery does not appear to be economically attractive under present or foreseeable market conditions

  8. Summary of the engineering assessment of inactive uranium mill tailings: Monument Valley site, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Monument Valley site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Monument Valley, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.1 million tons of tailings at the Monument Valley site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $6,600,000 for stabilization in-place, to about $15,900,000 for disposal at a distance of about 15 mi. Three principal alternatives for reprocessing the Monument Valley tailings were examined: heap leaching, treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be more than $500/lb of U 3 O 8 by heap leach or conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is economically unattractive

  9. Uranium Mill Tailings Remedial Action Project surface project management plan

    International Nuclear Information System (INIS)

    1994-09-01

    This Project Management Plan describes the planning, systems, and organization that shall be used to manage the Uranium Mill Tailings Remedial Action Project (UMTRA). US DOE is authorized to stabilize and control surface tailings and ground water contamination at 24 inactive uranium processing sites and associated vicinity properties containing uranium mill tailings and related residual radioactive materials

  10. Colorado's prospectus on uranium milling

    International Nuclear Information System (INIS)

    Hazle, A.J.; Franz, G.A.; Gamewell, R.

    1982-01-01

    The first part of this paper will discuss Colorado's control of uranium mill tailings under Titles I and II of the Uranium Mill Tailings Radiation Control Act of 1978. Colorado has a legacy of nine inactive mill sites requiring reclamation under Title I, and two presently active plus a number of new mill proposals which must be regulated in accordance with Title II. Past failures in siting and control on the part of federal jurisdictions have left the state with a heavy legacy requiring extensive effort to address impacts to the state's environment and population. The second part of this paper will discuss the remedial action programme authorized under Public Law 92-314 for Mesa Country, where lack of federal control led to the dispersal of several hundred thousand tons of uranium mill tailings on thousands of properties, including hundreds of homes, schools and other structures. Successful completion of the State efforts under both programmes will depend on a high level of funding and on the maintenance of adequate regulatory standards. (author)

  11. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Rifle, Colorado: Final report

    International Nuclear Information System (INIS)

    1990-02-01

    This radiologic characterization of tho two inactive uranium millsites at Rifle, Colorado, was conducted by Bendix Field Engineering Corporation (Bendix) for the US Department of Energy (DOE), Grand Junction Projects Office, in accord with a Statement of Work prepared by the DOE Uranium Mill Tailings Remedial Action (UMTRA) Project Technical Assistance Contractor, Jacobs Engineering Group, Inc. (Jacobs). The purpose of this project is to define the extent of radioactive contamination at the Rifle sites that exceeds US Environmental Protection Agency, (EPA) standards for UMTRA sites. The data presented in this report are required for characterization of the areas adjacent to the tailings piles and for the subsequent design of cleanup activities. An orientation visit to the study area was conducted on 31 July--1 August 1984, in conjunction with Jacobs, to determine the approximate extent of contaminated area surrounding tho piles. During that visit, survey control points were located and baselines were defined from which survey grids would later be established; drilling requirements were assessed; and radiologic and geochemical data were collected for use in planning the radiologic fieldwork. The information gained from this visit was used by Jacobs, with cooperation by Bendix, to determine the scope of work required for the radiologic characterization of the Rifle sites. Fieldwork at Rifle was conducted from 1 October through 16 November 1984

  12. Summary of the engineering assessment of inactive uranium mill tailings: Slick Rock sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah, Inc., has reevaluated the Slick Rock sites in order to revise the October 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Slick Rock, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 387,000 tons of tailings at the Slick Rock sites constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The five alternative actions presented in this engineering assessment include millsite decontamination with the addition of 3 m of stabilization cover material, consolidation of the piles, and removal of the tailings to remote disposal sites and decontamination of the tailings sites. Cost estimates for the five options range from about $6,800,000 for stabilization in-place, to about $11,000,000 for disposal at a distance of about 6.5 mi. Three principal alternatives for the reprocessing of the Slick Rock tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be over $800/lb of U 3 O 8 whether by conventional or heap leach plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery is not economically attractive at present, nor for the foreseeable future

  13. Uranium Mill Tailings Management

    International Nuclear Information System (INIS)

    Nelson, J.D.

    1982-01-01

    This book presents the papers given at the Fifth Symposium on Uranium Mill Tailings Management. Advances made with regard to uranium mill tailings management, environmental effects, regulations, and reclamation are reviewed. Topics considered include tailings management and design (e.g., the Uranium Mill Tailings Remedial Action Project, environmental standards for uranium mill tailings disposal), surface stabilization (e.g., the long-term stability of tailings, long-term rock durability), radiological aspects (e.g. the radioactive composition of airborne particulates), contaminant migration (e.g., chemical transport beneath a uranium mill tailings pile, the interaction of acidic leachate with soils), radon control and covers (e.g., radon emanation characteristics, designing surface covers for inactive uranium mill tailings), and seepage and liners (e.g., hydrologic observations, liner requirements)

  14. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Lakeview, Oregon: Volume 1, Text and appendices A through D

    International Nuclear Information System (INIS)

    Chernoff, A.R.

    1992-07-01

    The Lakeview inactive uranium processing site is in Lake County, Oregon, approximately one mile northwest of the town of Lakeview, sixteen miles north of the California-Oregon border, and 96 miles east of Klamath Falls. The total designated site covers an area of 258 acres consisting of a tailings pile (30 acres). seven evaporation ponds (69 acres), the mill buildings, and related structures. The mill buildings and other structures have been decontaminated and are currently being used by Goose Lake Lumber Company. The tailings pile at the processing site was originally stabilized by Atlantic Richfield with an earthen cover 18--24 inches thick. The average depth of the tailings, including the cover, varied from six to eight feet. There were estimated to be 662,000 cubic yards of tailings, windblown contaminated materials, and vicinity property materials. During remedial action under the Uranium Mill Tailings Remedial Action (UMTRA) Project, approximately 264,000 cubic yards of additional contaminated materials were identified from excavations required to remove thorium- and arsenic-contaminated soils. The remedial action for the Lakeview site consisted of the cleanup, relocation, consolidation, and stabilization of all residual radioactive materials and thorium- and arsenic-contaminated materials in a partially below-grade disposal cell at a location approximately seven miles northwest of the tailings site, identified as the Collins Ranch site. A cover, including a radon/infiltration barrier and rock layer for protection from erosion, was Placed on top of the tailings. A rock-soil matrix covers the topslope and provides a growth medium for vegetation. The US Department of Energy (DOE) will retain the license and surveillance and maintenance responsibilities for the final restricted site of 13 acres

  15. Revegetation/rock cover for stabilization of inactive uranium mill tailings disposal sites

    International Nuclear Information System (INIS)

    Beedlow, P.A.; McShane, M.C.; Cadwell, L.L.

    1982-07-01

    Pacific Northwest Laboratory is developing design and performance guidelines for surface stabilization of inactive uranium mill tailings. In this work, vegetation and rock covers are being evaluated for maintaining long-term integrity of impoundment systems. Methods are being developed to estimate erosion rates associated with rock and/or vegetation covers, and to determine the effects of surface treatments on soil moisture. Interactions between surface treatments and barriers (radon and biological) are being studied as well. The product will be a set of guidelines to aid in designing surface covers. This report presents the status of this program and a discussion of considerations pertinent to the application of surface covers to tailings. Test plots located in Grand Junction, Colorado and Waterflow, New Mexico are being used to study: (1) the interactions between vegetation and radon and biological barriers, (2) the effects of surface covers on soil moisture, and (3) the effects of rock covers on vegetation

  16. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA)

  17. Annual status report on the Uranium Mill Tailings Remedial Action Program

    Energy Technology Data Exchange (ETDEWEB)

    1989-12-01

    This eleventh annual status report summarizes activities of the Uranium Mill Tailings Remedial Action (UMTRA) Project undertaken during Fiscal Year (FY) 1989 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1990 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95--604. The DOE will continue to submit an annual report through project completion in order to inform the public of yearly project status. Title I of the UMTRCA authorizes the DOE, in cooperation with affected states and Indian tribes within whose boundaries designated uranium processing sites are located, to provide a program of assessment and remedial action at such sites. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive materials located on the inactive uranium processing sites in a safe and environmentally sound manner and to minimize or eliminate potential radiation health hazards. Commercial and residential properties in the vicinity of designated processing sites that are contaminated with material from the sites, herein referred to as vicinity properties,'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated vicinity properties located in 10 states, and the vicinity properties associated with Edgemont, South Dakota, an inactive uranium mill currently owned by the Tennessee Valley Authority (TVA).

  18. The U.S. regulatory framework for long-term management of uranium mill tailings

    International Nuclear Information System (INIS)

    Smythe, C.; Bierley, D.; Bradshaw, M.

    1995-01-01

    The US established the regulatory structure for the management, disposal, and long-term care of uranium mill tailings in 1978 with the passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Pub. L. 95-604). This legislation has governed the cleanup and disposal of uranium tailings at both inactive and active sites. The passage of the UMTRCA established a federal regulatory program for the cleanup and disposal of uranium mill tailings in the US. This program involves the DOE, the NRC, the EPA, various states and tribal governments, private licensees, and the general public. The DOE has completed surface remediation at 14 sites, with the remaining sites either under construction or in planning. The DOE's UMTRA Project has been very successful in dealing with public and agency demands, particularly regarding disposal site selection and transportation issues. The active sites are also being cleaned up, but at a slower pace than the inactive sites, with the first site tentatively scheduled for completion in 1996

  19. 10 CFR 40.2a - Coverage of inactive tailings sites.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Coverage of inactive tailings sites. 40.2a Section 40.2a... Coverage of inactive tailings sites. (a) Prior to the completion of the remedial action, the Commission..., if the site is covered by the remedial action program of title I of the Uranium Mill Tailings...

  20. Annual status report on the Uranium Mill Tailings Remedial Action Program

    International Nuclear Information System (INIS)

    1992-12-01

    This fourteenth annual status report for the Uranium Mill Tailings Remedial Action (UMTRA) Project Office summarizes activities of the Uranium Mill Tailings Remedial Action Surface (UMTRA-Surface) and Uranium Mill Tailings Remedial Action Groundwater (UMTRA-Groundwater) Projects undertaken during fiscal year (FY) 1992 by the US Department of Energy (DOE) and other agencies. Project goals for FY 1993 are also presented. An annual report of this type was a statutory requirement through January 1, 1986, pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604. The DOE will continue to submit annual reports to DOE-Headquarters, the states, tribes, and local representatives through Project completion in order to inform the public of the yearly Project status. The purpose of the remedial action is to stabilize and control the tailings and other residual radioactive material (RRM) located on the inactive uranium processing sites in a safe and environmentally sound manner, and to minimize or eliminate potential health hazards. Commercial and residential properties near designated processing sites that are contaminated with material from the sites, herein referred to as ''vicinity properties (VP),'' are also eligible for remedial action. Included in the UMTRA Project are 24 inactive uranium processing sites and associated VPs located in 10 states, and the VPs associated with the Edgemont, South Dakota, uranium mill currently owned by the Tennessee Valley Authority (TVA) (Figure A.1, Appendix A)

  1. Remedial action plan and site design for stabilization of the inactive Uranium Mill Tailing site Maybell, Colorado. Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final report

    International Nuclear Information System (INIS)

    1994-06-01

    The U.S. Environmental Protection Agency (EPA) has established health and environmental regulations to correct and prevent ground water contamination resulting from former uranium processing activities at inactive uranium processing sites (40 CFR Part 192 (1993)) (52 FR 36000 (1978)). According to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (42 USC section 7901 et seq.), the U.S. Department of Energy (DOE) is responsible for assessing the inactive uranium processing sites. The DOE has decided that each assessment will include information on hydrogeologic site characterization. The water resources protection strategy that describes the proposed action compliance with the EPA ground water protection standards is presented in Attachment 4, Water Resources Protection Strategy. Site characterization activities discussed in this section include the following: (1) Definition of the hydrogeologic characteristics of the environment, including hydrostratigraphy, aquifer parameters, areas of aquifer recharge and discharge, potentiometric surfaces, and ground water velocities. (2) Definition of background ground water quality and comparison with proposed EPA ground water protection standards. (3) Evaluation of the physical and chemical characteristics of the contaminant source and/or residual radioactive materials. (4) Definition of existing ground water contamination by comparison with the EPA ground water protection standards. (5) Description of the geochemical processes that affect the migration of the source contaminants at the processing site. (6) Description of water resource use, including availability, current and future use and value, and alternate water supplies

  2. Finding and evaluating potential radiological problems in the vicinity of uranium milling sites

    International Nuclear Information System (INIS)

    Goldsmith, W.A.; Yates, W.G.

    1982-01-01

    The Oak Ridge National Laboratory (ORNL) has been performing radiological surveys at former uranium and thorium milling and processing sites since 1975. Tailings at inactive milling sites usually have a low frequency of human occupancy but continuously generate 222 Rn into the atmosphere. Thus, independent 222 Rn surveys are conducted at the inactive mill sites and their environs by the Mound Facility. Measurements of airborne 222 Rn and 222 Rn flux are made on the sites to define the tailings source term. Concurrently with these measurements, an ambient 222 Rn monitoring network is established off-site and a meteorological station is established at or near the mill site. Unfortunately, tailings are not always confined to the milling site. Radioactivity can migrate to areas outside of site boundaries by wind and water erosion, groundwater transport, spillage of incoming ore, and removal of tailings or other material for private purposes. In order to identify and assess off-site radioactivity on properties in the vicinity of milling sites, a combination of aerial and ground-level radiological monitoring techniques are used. The ground mobile gamma-ray scan is conducted using a vehicle equipped with sensitive gamma-ray detectors. The detectors are shielded so that gamma radiation input is viewed through only one side of the vehicle. This system is capable of precisely locating properties which have anomalously high gamma radiation levels caused by the presence of tailings. Subsequently, these properties are identified as candidate vicinity properties and are scheduled for radiological surveys subject to the property owner's consent. The comprehensive radiological surveys conducted at these vicinity properties determine the amount, type, and location of tailings materials

  3. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA

  4. Uranium Mill Tailings Remedial Action Project, Surface Project Management Plan. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) authorizes the US Department of Energy (DOE) to undertake remedial action at 24 designated inactive uranium processing sites and associated vicinity properties (VP) containing uranium mill tailings and related residual radioactive materials. The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Surface Project is to minimize or eliminate radiation health hazards to the public and the environment at the 24 sites and related VPs. This document describes the management organization, system, and methods used to manage the design, construction, and other activities required to clean up the designated sites and associated VPs, in accordance with the UMTRCA.

  5. Summary of the engineering assessment of inactive uranium mill tailings: Falls City site, Falls City, Texas

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Falls City site in order to update the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranum mill tailings at Falls City, Texas. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrolgy and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,700,000 for stabilization in place, to about $35,100,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Falls City tailings were examined: heap leaching; treatment at an existing mill; reprocessing at a new conventional mill constructed for tailings reprocessing. The tailings piles are presently being rewashed for uranium recovery by Solution Engineering, Inc. The cost for further reprocessing would be about $250/lb of U 3 O 8 . The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery does not appear to be economically attractive for the foreseeable future

  6. Radiological survey of the inactive uranium-mill tailings at Durango, Colorado

    International Nuclear Information System (INIS)

    Haywood, F.F.; Perdue, P.T.; Shinpaugh, W.H.; Ellis, B.S.; Chou, K.D.

    1980-03-01

    Results of a radiological survey of the inactive uranium-mill site at Durango, Colorado, conducted in April 1976, in cooperation with a team from Ford, Bacon and Davis Utah Inc., are presented together with descriptions of the instruments and techniques used to obtain the data. Direct above-ground gamma measurements and analysis of surface soil and sediment samples indicate movement of tailings from the piles toward Lightner Creek on the north and the Animas River on the east side of the piles. The concentration of 226 Ra in the former raffinate pond area is only slightly above the background level. Two structures in Durango were found to contain high concentrations of airborne radon daughters, where tailings are known to have been utilized in construction. Near-background concentrations of radon daughters were found in a well-ventilated building close to the tailings

  7. Summary of the engineering assessment of inactive uranium mill tailings

    International Nuclear Information System (INIS)

    1981-07-01

    The Grand Junction site has been reevaluated in order to revise the october 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented herein range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Option II through VIII). Cost estimates for the eight options range from about $10,200,000 for stabilization in-place to about $39,500,000 for disposal in the DeBeque area, at a distance of about 35 mi, using transportation by rail. If transportation to DeBeque were by truck, the cost is estimated to be about $41,900,000. Three prinicpal alternatives for the reprocessing of the Grand Junction tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $200/lb by heap leach and $150/lb by conventional plant processes. The spot market price for uranium was $25/lb early in 1981. Therefore, reprocessing the tailings for uranium recovery appears not to be economically attractive

  8. Engineering assessment of inactive uranium mill tailings, Green River Site, Green River, Utah

    International Nuclear Information System (INIS)

    1981-08-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Green River site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Green River, Utah. This evaluation has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the 123,000 tons of tailings at the Green River site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors

  9. Assessment of the radiological impact of the inactive uranium-mill tailings at Shiprock, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Haywood, F.F.; Goldsmith, W.A.; Lantz, P.M.; Fox, W.F.; Shinpaugh, W.H.; Hubbard, H.M. Jr.

    1979-12-01

    Uranium-mill tailings at an inactive site near Shiprock, New Mexico, contain an estimated 950 curies (Ci) of /sup 226/Ra together with its radioactive daughters. A radiological survey was conducted at this site in February 1976. Decontamination work and tailings stabilization performed at the site since that time have greatly changed conditions there and little effort was applied to quantification of potential health effects in comparison to the earlier consideration of the site at Salt Lake City. The present report delineates the radiological conditions that existed at the time of the survey including information on the surface and below-surface distribution of /sup 226/Ra. The data presented support the conclusion that diffusion of radon and inhalation of radon daughters is the principal mode of exposure of offsite population groups.

  10. Assessment of the radiological impact of the inactive uranium-mill tailings at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    Haywood, F.F.; Goldsmith, W.A.; Lantz, P.M.; Fox, W.F.; Shinpaugh, W.H.; Hubbard, H.M. Jr.

    1979-12-01

    Uranium-mill tailings at an inactive site near Shiprock, New Mexico, contain an estimated 950 curies (Ci) of 226 Ra together with its radioactive daughters. A radiological survey was conducted at this site in February 1976. Decontamination work and tailings stabilization performed at the site since that time have greatly changed conditions there and little effort was applied to quantification of potential health effects in comparison to the earlier consideration of the site at Salt Lake City. The present report delineates the radiological conditions that existed at the time of the survey including information on the surface and below-surface distribution of 226 Ra. The data presented support the conclusion that diffusion of radon and inhalation of radon daughters is the principal mode of exposure of offsite population groups

  11. Summary of the engineering assessment of inactive uranium-mill tailings: Canonsburg Site, Canonsburg, Pennsylvania

    International Nuclear Information System (INIS)

    1982-04-01

    Ford, Bacon and Davis Utah Inc. has evaluated the Canonsburg site in order to assess the problems resulting from the existence of radioactive residues at Canonsburg, Pennsylvania. This engineering assessment has included the preparation of topographic maps, radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative remedial actions. Radon gas released from the approximately 300,000 tons of tailings and contaminated soil at the Canonsburg site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings and contaminated materials to a remote disposal site and decontamination of the Canonsburg site (Options II through IV). Cost estimates for the four options range from $23,244,000 for stabilization in-place, to $27,052,000 for disposal at a distance of about 17 mi. Three principal alternatives for the reprocessing of the Canonsburg tailings were examined: heap leaching; treatment at an existing mill; and reprocessing at a new conventional mill constructed for tailings reprocessing. As required by Public Law 95-604, under whose auspices this project is conducted, the US Department of Energy has solicited expressions of interest in reprocessing the tailings and residues at the Canonsburg site for uranium recovery. Since no such interest was demonstrated, no effort has been made to estimate the value of the residual uranium resource at the Canonsburg site

  12. Summary of the engineering assessment of inactive uranium mill tailings, Durango Site, Durango, Colorado

    International Nuclear Information System (INIS)

    1981-06-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Durango site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. This engineering assessment has included the preparation of topographic measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the nearly 1.6 million tons of tailings at the Durango site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II through IV). Cost estimates for the seven options range from about $10,700,000 for stabilization in-place, to about $21,800,000 for disposal at a distance of about 10 mi. Three principal alternatives for the reprocessing of the Durango tailings were examined: (a) heap leaching; (b) treatment at an existing mill; and (c) reprocessing at a new conventional mill constructed for tailings reprocessing

  13. Remedial action plan for the inactive Uranium Processing Site at Naturita, Colorado. Remedial action plan: Attachment 2, Geology report, Attachment 3, Ground water hydrology report: Working draft

    International Nuclear Information System (INIS)

    1994-09-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, become Appendix B of the cooperative agreement between the DOE and the state of Colorado

  14. Radiological survey of the inactive uranium-mill tailings at Green River, Utah

    International Nuclear Information System (INIS)

    Haywood, F.F.; Christian, D.J.; Ellis, B.S.; Hubbard, H.M. Jr.; Lorenzo, D.; Shinpaugh, W.H.

    1980-03-01

    The uranium-mill tailings at Green River, Utah, are relatively low in 226 Ra content and concentration (20 Ci and 140 pCi/g, respectively) because the mill was used to upgrade the uranium ore by separating the sand and slime fractions; most of the radium was transported along with the slimes to another mill site. Spread of tailings was observed in all directions, but near-background gamma exposure rates were reached at distances of 40 to 90 m from the edge of the pile. Water erosion of the tailings is evident and, since a significant fraction of the tailings pile lies in Brown's Wash, the potential exists for repetition of the loss of a large quantity of tailings such as occurred during a flood in 1959. In general, the level of surface contamination was low at this site, but some areas in the mill site, which were being used for nonuranium work, have gamma-ray exposure rates up to 143 μR/hr

  15. Radiological survey of the inactive uranium-mill tailings at Lakeview, Oregon

    International Nuclear Information System (INIS)

    Haywood, F.F.; Burden, J.E.; Ellis, B.S.; Loy, E.T.; Shinpaugh, W.H.

    1980-06-01

    The results of the radiological survey of the inactive uranium-mill site at Lakeview, Oregon, show that the average gamma-ray exposure rate 1 m above the tailings pile and the evaporation pond area (now dry) is close to the average background level for the area (11 μR/hr). The 226 Ra concentration in most of the surface soil and sediment samples is also at or below the average background value for surface soil samples in the area (0.8 pCi/g). Calculated 226 Ra concentrations, based on gamma radiation measurements in shallow (1-m-deep) holes, are in agreement with the results of surface soil and sediment analyses and with gamma-ray exposure rate measurements. The tailings at this site have been stabilized by the addition of 46 to 60 cm (18 to 24 in.) of soil that supports vigorous growth of vegetation. This treatment, coupled with a low-level inventory of 226 Ra in the tailings (50 Ci), has resulted in limited spread of tailings by wind and water

  16. Engineering assessment of inactive uranium mill tailings, Ray Point Site, Ray Point, Texas. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    Results are reported from an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ray Point, Texas. The Phase II--Title I services generally include the preparation of topographic maps, the performance of soil sampling and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. About 490,000 tons of ore were processed at this mill with all of the uranium sold on the commercial market. None was sold to the AEC; therefore, this report focuses on a physical description of the site and the identification of radiation pathways. No remedial action options were formulated for the site, inasmuch as none of the uranium was sold to the AEC and Exxon Corporation has agreed to perform all actions required by the State of Texas. Radon gas release from the tailings at the Ray Point site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. Exxon is also studying the feasibility of reprocessing the tailings

  17. Bioremediation of ground water contaminants at a uranium mill tailings site

    International Nuclear Information System (INIS)

    Barton, L.L.; Nuttall, H.E.; Thomson, B.M.; Lutze, W.

    1995-01-01

    Ground water contaminated with uranium from milling operations must be remediated to reduce the migration of soluble toxic compounds. At the mill tailings site near Tuba City, Arizona (USA) the approach is to employ bioremediation for in situ immobilization of uranium by bacterial reduction of uranyl, U(VI), compounds to uraninite, U(IV). In this initial phase of remediation, details are provided to indicate the magnitude of the contamination problem and to present preliminary evidence supporting the proposition that bacterial immobilization of uranium is possible. Additionally, consideration is given to contaminating cations and anions that may be at toxic levels in ground water at this uranium mill tailing site and detoxification strategies using bacteria are addressed. A model concept is employed so that results obtained at the Tuba City site could contribute to bioremediation of ground water at other uranium mill tailings sites

  18. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    The Slick Rock uranium mill tailings sites are located near the small town of Slick Rock, in San Miguel County, Colorado. There are two designated UMTRA sites at Slick Rock, the Union Carbide (UC) site and the North Continent (NC) site. Both sites are adjacent to the Dolores River. The UC site is approximately 1 mile (mi) [2 kilometers (km)] downstream of the NC site. Contaminated materials cover an estimated 55 acres (ac) [22 hectares (ha)] at the UC site and 12 ac (4.9 ha) at the NC site. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 620, 000 cubic yards (yd 3 ) [470,000 cubic meters (m 3 )]. In addition to the contamination at the two processing site areas, four vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into groundwater

  19. Summary of the engineering assessment of inactive uranium mill tailings: Phillips/United Nuclear site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah, Inc., has reevaluated the Phillips/United Nuclear site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Ambrosia Lake, New Mexico. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 2.6 million dry tons of tailings at the Phillips/United Nuclear site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the four options range from about $21,500,000 for stabilization in-place, to about $45,200,000 for disposal at a distance of about 15 mi. Three principal alternatives for the reprocessing of the Phillips/United Nuclear tailings were examined: heap leaching; treatment at an existing mill; reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $87/lb of U 3 O 8 by either heap leach or conventional plant process. The spot market price for uranium was $25/lb early in 1981. Reprocessing the Phillips/United Nuclear tailings for uranium recovery does not appear to be economically attractive under present or foreseeable market conditions

  20. Engineering assessment of inactive uranium mill tailings, Spook site, Converse County, Wyoming

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Spook site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings 48 mi northeast of Casper, in Converse County, Wyoming. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 187,000 tons of tailings at the Spook site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover makes and gamma densitometers for measuring cross-sectionally averaged mass velocity in steady steam-water flow are presented. The results are interpreted ntation

  1. Engineering assessment of inactive uranium mill tailings, Spook site, Converse County, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1981-10-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Spook site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings 48 mi northeast of Casper, in Converse County, Wyoming. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 187,000 tons of tailings at the Spook site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover makes and gamma densitometers for measuring cross-sectionally averaged mass velocity in steady steam-water flow are presented. The results are interpreted ntation.

  2. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    International Nuclear Information System (INIS)

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC section 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE's remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado

  3. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. Remedial action selection report: Attachment 2, geology report; Attachment 3, ground water hydrology report; Attachment 4, supplemental information

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    The uranium processing site near Naturita, Colorado, is one of 24 inactive uranium mill sites designated to be cleaned up by the U.S. Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), 42 USC {section} 7901 et seq. Part of the UMTRCA requires that the U.S. Nuclear Regulatory Commission (NRC) concur with the DOE`s remedial action plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the U.S. Environmental Protection Agency (EPA). This RAP serves two purposes. First, it describes the activities that are proposed by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium processing site near Naturita, Colorado. Second, this RAP, upon concurrence and execution by the DOE, the state of Colorado, and the NRC, becomes Appendix B of the cooperative agreement between the DOE and the state of Colorado.

  4. Engineering assessment of inactive uranium mill tailings, Naturita Site, Naturita, Colorado

    International Nuclear Information System (INIS)

    1981-07-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Naturita site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive contamination at the former uranium mill tailings site at Naturita, Colorado. This evaluation has included the preparation of topographic maps, the drilling of boreholes and radiometric measurements sufficient to determine areas and volumes of contaminated materials and radiation exposures of individuals and nearby populations, and the evaluation and costing of alternative remedial actions. Radon gas released from the estimated 344,000 tons of contaminated materials that remain at the Naturita site constitutes the most significant environmental impact, although external gamma radiation also is a factor. The two alternative actions presented in this engineering assessment are stabilization of the site in its present location with the addition of 3 m of stabilization cover material (Option I), and removal of residual radioactive materials to a disposal site and decontamination of the Naturita site (Option II). Cost estimates for the two options are about $7,200,000 for stabilization in-place, and about $8,200,000 for disposal at the Ranchers Exploration and Development Corporations's reprocessing site. Truck haulage would be used to transport the contaminated materials from the Naturita site to the selected disposal site.Ranchers Exploration and Development Corporation removed the tailings from the site, reprocessed them, and disposed of them from 1977 to 1979. There is no noteworthy mineral resource remaining at the former tailings site; therefore, recovery of residual mineral values was not considered in this assessment

  5. Sandia's activities in uranium mill tailings remedial action

    International Nuclear Information System (INIS)

    Neuhauser, S.

    1980-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 requires that remedial action be taken at over 20 inactive uranium mill tailings sites in the United States. Standards promulgated by the EPA under this act are to be the operative standards for this activity. Proposed standards must still undergo internal review, public comment, and receive Nuclear Regulatory Commission concurrence before being finalized. Briefly reviewed, the standards deal separately with new disposal sites (Part A) and cleanup of soil and contaminated structures at existing locations (Part B). In several cases, the present sites are felt to be too close to human habitations or to be otherwise unacceptably located. These tailings will probably be relocated. New disposal sites for relocated tailings must satisfy certain standards. The salient features of these standards are summarized

  6. System for the hydrogeologic analysis of uranium mill waste disposal sites

    International Nuclear Information System (INIS)

    Osiensky, J.L.

    1983-01-01

    Most of the uranium mill wastes generated before 1977 are stored in unlined tailings ponds. Seepage from some of these ponds has been of sufficient severity that the US Nuclear Regulatory Commission (NRC) has required the installation of withdrawal wells to remove the contaminated groundwater. Uranium mill waste disposal facilities typically are located in complex hydrogeologic environments. This research was initiated in 1980 to analyze hydrogeologic data collected at seven disposal sites in the US that have experienced problems with groundwater contamination. The characteristics of seepage migration are site specific and are controlled by the hydrogeologic environment in the vicinity of each tailings pond. Careful monitoring of most seepage plumes was not initiated until approximately 1977. These efforts were accelerated as a consequence of the uranium Mill Tailings Act of 1979. Some of the data collected at uranium mill waste disposal sites in the past are incomplete and some were collected by methods that are outdated. Data frequently were collected in sequences which disrupted the continuity of the hydrogeologic analysis and decreased the effectiveness of the data collection programs. Evaluation of data collection programs for seven uranium mill waste disposal sites in the US has led to the development and presentation herein of a system for the hydrogeologic analysis of disposal sites

  7. UMTRA -- The US Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Lightner, R.; Cormier, C.; Bierley, D.

    1995-01-01

    In the late 1970s, the United States (US) established the first comprehensive regulatory structure for the management, disposal, and long-term care of wastes produced from its domestic uranium processing industry. This regulatory framework was established through the passage of the Uranium Mill Tailings Radiation Control Act of 1978, often referred to as UMTRCA. This legislation created the Uranium Mill Tailings Remedial Action (UMTRA) Project and assigned the US Department of Energy (DOE) the lead in conducting the required remedial action at 24 designated inactive uranium ore processing sites. With the majority of these 22 sites complete, the DOE's UMTRA Project has established a distinguished reputation for safely and effectively remediating these low-level waste sites in a complex regulatory and socioeconomic environment. This paper describes the past accomplishments and current status of the UMTRA Project and discusses the DOE's plans for addressing ground water contamination associated with these sites and its commitment to continuing the long-term care and management of these disposal cells

  8. Engineering assessment of inactive uranium mill tailings, Gunnison Site, Gunnison, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Gunnison, Colorado. The Phase II - Title I services include the preparation of topographic measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 0.5 million tons of tailings at the Gunnison site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The nine alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through IX). Cost estimates for the nine options range from $480,000 to $5,890,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present

  9. Site selection and general layout of heap leaching uranium mill

    International Nuclear Information System (INIS)

    Zhang Chunmao; Rongfeng

    2011-01-01

    The site selection and general layout of uranium mill is an important work in the design and consultation stage of uranium mining and metallurgy's engineering construction. Based on the design practices, the principles and methods for the site selection and general layout of heap leaching uranium mill are analyzed and studied. Some problems which should be paid much attention to in the design are discussed in hopes of providing a useful reference for the design and consultation of similar projects. (authors)

  10. 40 CFR 61.151 - Standard for inactive waste disposal sites for asbestos mills and manufacturing and fabricating...

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 8 2010-07-01 2010-07-01 false Standard for inactive waste disposal sites for asbestos mills and manufacturing and fabricating operations. 61.151 Section 61.151 Protection... inactive waste disposal sites for asbestos mills and manufacturing and fabricating operations. Each owner...

  11. Radiological survey of the inactive uranium-mill tailings at Tuba City, Arizona

    International Nuclear Information System (INIS)

    Haywood, F.F.; Jones, T.D.; Hubbard, H.M. Jr.; Ellis, B.S.; Shinpaugh, W.H.

    1980-01-01

    Results of a radiological survey of the inactive uranium-mill site at Tuba City, Arizona, conducted in March 1976, are presented. Spread of tailings was detected in all directions by means of direct gamma measurements at 1 m above the ground and by determinations of the 226 Ra concentration in surface soil and sediment samples. In the direction toward which prevailing winds blow, the northeast, evidence of transportation of tailings was found at least 3.2 km from the tailings pile. Toward the north, south, and west, the spread was 300 to 400 m. Evidence of movement of tailings by water to offsite locations was also found. The concentration of 226 Ra in all water samples was well below the concentration guide for drinking water. The calculated subsoil distribution of 226 Ra in 14 holes, based on gamma monitoring data obtained by Ford, Bacon and Davis Utah Inc., is presented graphically and compared with available analytical data

  12. Summary of the engineering assessment of inactive uranium mill tailings, Green River site, Green River, Utah

    International Nuclear Information System (INIS)

    1981-08-01

    Radon gas released from the 123,000 tons of tailings at the Green River site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The five alternative actions range from millsite decontamination with the addition of 3 m of stabilization cover material, to removal of the tailings to remote disposal sites and decontamination of the tailings site. Cost estimates for the five options range from about $4,300,000 for stabilization in-place, to about $9,600,000 for disposal at a distance of about 30 miles. Three principal alternatives for the reprocessing of the Green River tailings were examined: heap leaching, treatment at an existing mill, and reprocessing at a new conventional mill constructed for tailings reprocessing. The cost of the uranium recovered would be about $1,800/lb by heap leach and $1,600/lb by conventional plant processes

  13. Remedial action at the Green River uranium mill tailings site, Green River, Utah: Environmental assessment

    International Nuclear Information System (INIS)

    1988-07-01

    The inactive Green River uranium mill tailings site is one mile southeast of Green River, Utah. The existing tailings pile is within the floodplain boundaries of the 100-year and 500-year flood events. The 48-acre designated site contains eight acres of tailings, the mill yard and ore storage area, four main buildings, a water tower, and several small buildings. Dispersion of the tailings has contaminated an additional 24 acres surrounding the designated site. Elevated concentrations of molybdenum, nitrate, selenium, uranium, and gross alpha activity exceed background levels and the proposed US Environmental Protection Agency (EPA) maximum concentration limits in the groundwater in the unconsolidated alluvium and in the shallow shales and limestones beneath the alluvium at the mill tailings site. The contamination is localized beneath, and slightly downgradient of, the tailings pile. The proposed action is to relocate the tailings and associated contaminated materials to an area 600 feet south of the existing tailings pile where they would be consolidated into one, below-grade disposal cell. A radon/infiltration barrier would be constructed to cover the stabilized pile and various erosion control measures would be taken to ensure the long-term stability of the stabilized pile. 88 refs., 12 figs., 20 tabs

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer at the point of compliance (POC) at the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site near Gunnison, Colorado. The proposed remedial action will ensure protection of human health and the environment. A summary of the principal features of the water resources protection strategy for the Gunnison disposal site is included in this report

  15. Health physics program for the Edgemont Uranium Mill decommissioning project

    International Nuclear Information System (INIS)

    Polehn, J.L.; Wallace, R.G.; Reed, R.P.; Wilson, G.T.

    1986-01-01

    The Tennessee Valley Authority (TVA) is actively involved in decommissioning a uranium mill located near the town of Edgemont, South Dakota. The Edgemont Mill Decommissioning Project, which is unique in many respects, will involve dismantlement of the old inactive mill building and excavation and transportation of several million tons of uranium mill tailings to a permanent disposal site. To ensure that workers are adequately protected from radiation exposure during decommissioning operations, a health physics program appropriate for the decommissioning situation was developed. The Edgemont Mill Decommissioning Project Health Physics Manual (HPM) gives the programmatic requirements for worker radiation protection. The requirements of the HPM are implemented by means of detailed onsite operating procedures. The Edgemont project health physics program was developed using currently available regulations and guidance for an operating uranium mill with appropriate modifications for decommissioning. This paper discusses the development, implementation, and documentation of that program

  16. Uranium Mill Tailings Remedial Action Project: technical approach document

    International Nuclear Information System (INIS)

    1986-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978, PL95-604, grants the Secretary of Energy authority and responsibility to perform such actions as are necessary to minimize radiation health hazards and other environmental hazards from inactive uranium mill sites. These cleanup actions are to be performed in compliance with the EPA standards (40 CFR Part 192) which became final on March 7, 1983. This document describes the general technical approaches and design criteria that are adopted by the US Department of Energy (DOE) in order to implement Remedial Action Plans (RAPs) and final designs that comply with EPA standards

  17. Overview of uranium mill tailings remedial action project of the United States of America 1995-1996

    International Nuclear Information System (INIS)

    Edge, R.

    1997-01-01

    From the early 1940's through the 1960's the United States federal government contracted for processed uranium ore for national defense research, weapons development and commercial nuclear energy. When these contracts were terminated, the mills ceased operation leaving large uranium tailings on the former mill sites. The purpose of the Uranium Remedial Action Project (UMTRA) is to minimize or eliminate potential health hazards resulting from exposure of the public to the tailings at these abandons sites. There are 24 inactive uranium mill tailings sites, in 10 states and an Indian reservation lands, included for clean up under the auspices of UMTRA. Presently the last 2 sites are under remediation. This paper addresses the progress of the project over the last two years. (author)

  18. Management and control of radioactive wastes from uranium-milling operations

    International Nuclear Information System (INIS)

    Kennedy, R.H.; Deal, L.J.; Haywood, F.F.; Goldsmith, W.A.

    1977-01-01

    Of the 39 privately owned mills that produced and sold uranium to the U.S. Government during 1948 to 1971, 22 have closed down either due to exhaustion of reserves or lack of market. On the inactive mill sites there remains 24 million metric tons of tailings containing 14,000 curies of radium. Success in stabilization has been variable. In the past, theoretical models have had to be used in estimation of the environmental effects of uranium milling for lack of a sufficient factual base. ERDA in cooperation with the Environmental Protection Agency and the states involved is undertaking a comprehensive radiological assessment at each site. The results of this assessment should provide valuable basic information on the environmental impact of uranium ore processing. The current studies reveal that the inactive sites are a cause of small public exposure to radiation, primarily from radon-222 from the tailings piles. This paper reviews radioactivity management in uranium ore processing to control spread of radioactive materials, including methods used for stabilization to prevent wind and water erosion. Recent measurements of radioactivity levels in soils, ground and surface waters, and in air near tailings piles are summarized, and public health implications are evaluated. Guidelines have been developed for land decontamination, and procedures evaluated for long-term management of contaminated material to minimize future human exposure. Alternative methods for long-term tailings stabilization, their costs and benefits in terms of serious health effects avoided are presented

  19. Completion of the uranium mill tailings remedial project and cleanup of the former mill site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    Rael, G.J.; Cox, S.W.; Artiglia, E.W.

    2000-01-01

    The United States Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Surface Project has successfully completed the cleanup of 22 former uranium mill sites, more than 5400 vicinity properties, and has constructed 18 entombment cells. The Project has recently received the United States Nuclear Regulatory Commission's approval and certification for the last two disposal sites, with these sites being placed under the general license for long term custodial care of residual radioactive material. The UMTRA site located at Grand Junction, Colorado is a good example of the technical, political, economic, and public relations challenges that were overcome in achieving success. The UMTRA Team discussed, negotiated, planned, and eventually acted on this uranium mill tailings problem and brought the project to a successful conclusion for the community. From the early 1940s through the 1970s, uranium ore was mined in significant quantities under United States federal contracts for the government's national defence programmes, i.e. the Manhattan Engineering District and Atomic Energy Commission programmes. The problem started as the need for uranium decreased in the late 1960s, resulting in mills shutting down, leaving behind large quantities of process waste tailings and contaminated mill buildings. The former Climax Uranium Company mill site in Grand Junction was one of the largest of these sites. (author)

  20. Programmatic Environmental Report for remedial actions at UMTRA [Uranium Mill Tailings Remedial Action] Project vicinity properties

    International Nuclear Information System (INIS)

    1985-03-01

    This Environmental Report (ER) examines the environmental consequences of implementing a remedial action that would remove radioactive uranium mill tailings and associated contaminated materials from 394 vicinity properties near 14 inactive uranium processing sites included in the Uranium Mill Tailings Remedial Action (UMTRA) Project pursuant to Public Law 95--604, the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Vicinity properties are those properties in the vicinity of the UMTRA Project inactive mill sites, either public or private, that are believed to be contaminated by residual radioactive material originating from one of the 14 inactive uranium processing sites, and which have been designated under Section 102(a)(1) of UMTRCA. The principal hazard associated with the contaminated properties results from the production of radon, a radioactive decay product of the radium contained in the tailings. Radon, a radioactive gas, can diffuse through the contaminated material and be released into the atmosphere where it and its radioactive decay products may be inhaled by humans. A second radiation exposure pathway results from the emission of gamma radiation from uranium decay products contained in the tailings. Gamma radiation emitted from contaminated material delivers an external exposure to the whole body. If the concentration of radon and its decay products is high enough and the exposure time long enough, or if the exposure to direct gamma radiation is long enough, cancers (i.e., excess health effects) may develop in persons living and working at the vicinity properties. 3 refs., 7 tabs

  1. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, M L [USDOE Albuquerque Operations Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Sullivan, M [Wyoming State Government, Cheyenne, WY (United States)

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement.

  2. Remedial Action Plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Spook, Wyoming

    International Nuclear Information System (INIS)

    Matthews, M.L.

    1990-04-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at an inactive uranium processing site northeast of Casper, Wyoming, and referred to as the Spook site. It provides a characterization of the present conditions at the site and also serves to document the concurrence of the State of Wyoming and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the State of Wyoming, and concurrence by the NRC, becomes Appendix B of the Cooperative Agreement

  3. Phase II, Title I engineering assessment of inactive uranium mill tailings, Mexican Hat site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1977-01-01

    An engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Mexican Hat millsite in Utah is presented. Topographic maps, data on core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions are presented. Radon gas release from the 2,200,000 tons of tailings on the site constitutes the most significant environmental impact. T he six alternative actions presented are directed towards restricting access to the site, returning the windblown tailings to the piles and stabilizing the piles with cover material, and consolidating the two piles into one pile and stabilizing it with cover material. Fencing around the site or the tailings and the decontamination of mill buildings is included in all options. Costs of the options range from $370,000 to $4,390,000

  4. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado: Remedial action selection report

    International Nuclear Information System (INIS)

    1992-10-01

    The Gunnison uranium mill tailings site is just south of the city limits of Gunnison, Colorado, in the south-central part of the state. The entire site covers 61 acres in the valley of the Gunnison River and Tomichi Creek. Contaminated materials at the Gunnison processing site include the tailings pile, covering about 35 acres to an average depth of nine feet and containing 459,000 cubic yards. Ore storage areas and the former mill processing area cover about 20 acres on the south side of the site. The volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 718,900 cubic yards. An interim action was approved by the US Department of Energy to eliminate existing safety hazards to the Gunnison community. These actions, started in September 1991, included demolition of mill buildings and related processing facilities, excavation of two underground storage tanks, removal of asbestos and other hazardous materials from buildings, storage of those materials in a secured area on the site, and improvements of site security

  5. Key programmatic steps and activities for implementing the Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1985-07-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) was enacted based upon findings by Congress ''that uranium mill tailings located at active and inactive hazard to the public, and that protection of the public health, safety and welfare, and the regulations of interstate commerce, require that every reasonable effort be made to provide for the stabilization, disposal, and control in a safe and environmentally sound manner of such tailings in order to prevent or minimize radon diffusion into the environment and to prevent or minimize other environmental hazards from such tailings.'' A general understanding of the steps leading to elimination of the hazards associated with designated uranium mill tailings sites, and the parties involved in that effort, are presented in this document. A representative schedule is also presented in this document to show both program sequence and activity interdependence. Those activities that have the most potential to influence program duration, because of the significant amount of additional time that may be required, include identification and selection of a suitable site, field data collection delays due to weather, actual acquisition of the designated or alternate disposal site, construction delays due to weather, and site licensing. This document provides an understanding of the steps, the sequence, the parties involved, and a representative duration of activities leading to remedial action and cleanup at the designated inactive uranium mill tailings sites. 10 refs., 5 figs., 1 tab

  6. Engineering assessment of inactive uranium mill tailings, Tube City site, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Tuba City site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Tuba City, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 0.8 million tons of tailings at the Tuba City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to rterial (Option I), to rema densitometers for measuring cross-sectionally averaged mass velocity in steady steam-water flow are presented. The results are interpreted ntation

  7. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    None

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required.

  8. Environmental Assessment of Remedial Action at the Riverton Uranium Mill Tailings Site, Riverton, Wyoming

    International Nuclear Information System (INIS)

    1987-06-01

    The US Department of Energy (DOE) has prepared an environmental assessment (DOE/EA-0254) on the proposed remedial action at the inactive uranium milling site near Riverton, Wyoming. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969 (42 U.S.C. 4321, et seq.). Therefore, the preparation of an environmental impact statement (EIS) is not required

  9. Engineering assessment of inactive uranium mill tailings, Maybell site, Maybell, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. The Phase II--Title I services include the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings and radiometric measurements to determine radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.6 million tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The three alternative actions presented range from fencing and maintenance (Option I), to placing the tailings in an open-pit mine and adding 2 ft of stabilization cover material (Option III). Cost estimates for the three options range from $250,000 to $4,520,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present

  10. Engineering assessment of inactive uranium mill tailings, Shiprock site, Shiprock, New Mexico. Phase II, Title I

    Energy Technology Data Exchange (ETDEWEB)

    1977-03-31

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.7 million tons of tailings at the Shiprock site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The 11 alternative actions presented range from completion of the present ongoing EPA site decontamination plan (Option I), to stabilizing in-place with varying depths of cover material (Options II-IV), to removal to an isolated long-term disposal site (Options V-XI). All options include remedial action costs for off-site locations where tailings have been placed. Costs estimates for the 11 options range from $540,000 to $12,500,000. Reprocessing the tailings for uranium is not economically feasible.

  11. Engineering assessment of inactive uranium mill tailings, Shiprock site, Shiprock, New Mexico. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-01-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Shiprock, New Mexico. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.7 million tons of tailings at the Shiprock site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The 11 alternative actions presented range from completion of the present ongoing EPA site decontamination plan (Option I), to stabilizing in-place with varying depths of cover material (Options II-IV), to removal to an isolated long-term disposal site (Options V-XI). All options include remedial action costs for off-site locations where tailings have been placed. Costs estimates for the 11 options range from $540,000 to $12,500,000. Reprocessing the tailings for uranium is not economically feasible

  12. Phase II, Title I, engineering assessment of inactive uranium mill tailings, Riverton Site, Riverton, Wyoming

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Spook Site, Converse County, Wyoming. Services include the performance of core drillings, soil, water and other sample analyses, radiometric measurements to determine areas with radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site geology, hydrology, and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 187,000 tons of tailings at the Spook Site constitutes the main environmental impact, which is negligible. The two alternative actions presented are better fencing of the site in its present state, and placing tailings and contaminated on-site materials and soil in the open-pit mine and covering the resulting pile with 2 ft of overburden materials. The cost estimates for the options are $81,000 and $142,000, respectively

  13. Environmental conditions of two abandoned uranium mill tailings sites in northern Saskatchewan

    International Nuclear Information System (INIS)

    Kalin, M.

    Two abandoned uranium mill tailings sites near Uranium City, Saskatchewan, have been studied in an attempt to follow the natural rehabilitation processes. The Gunnar site is a largely terrestrial environment while the Lorado mill tailings were discharged mainly into Nero Lake. This report describes the ecological conditions of both sites, potential long-term environmental degradation, and possible measures to assist the recovery of both areas

  14. Engineering assessment of inactive uranium mill tailings, Lakeview Site, Lakeview, Oregon. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    Results are reported from an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Lakeview, Oregon site. Results are included from the analyses of soil, water, and other samples; radiometric measurements to determine areas with radium-contaminated materials; evaluation of resulting radiation exposures of individuals and nearby populations; investigation of site geology, hydrology, and meteorology; and evaluation and costing of alternative corrective actions. Radon gas release from the 130,000 tons of tailings at the Lakeview site constitutes the main environmental impact, which is minimal. The two alternative actions presented are maintenance of the site now that the ARCO reclamation program has been completed (Option I); and addition of stabilization cover to a minimum depth of 2 ft, improved fencing, and removal of a few isolated spots of contamination (Option II). The cost estimates for these options are $40,000 and $290,000, respectively

  15. Uranium Mill Tailings Radiation Control Act of 1978

    International Nuclear Information System (INIS)

    Magee, J.

    1980-01-01

    The long-term environmental effects of the Uranium Mill Tailings Radiation Control Act of 1978 address the public health hazards of radioactive wastes and recognize the significance of this issue to public acceptance of nuclear energy. Title I of the Act deals with stabilizing and controlling mill tailings at inactive sites and classifies the sites by priority. It represents a major Federal commitment. Title II changes and strengthens Nuclear Regulatory Commission authority, but it will have little overall impact. It is not possible to assess the Act's effect because there is no way to know if current technology will be adequate for the length of time required. 76 references

  16. Engineering assessment of inactive uranium mill tailings, Durango site, Durango, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.555 million tons of tailings at the Durango site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from vegetative stabilization (Option I), to contouring and stabilizing in-place with varying depths of cover material (Options II and III), to removal to an isolated long-term disposal site (Options V to VIII). All options include remedial action costs for offsite locations where tailings have been placed. Costs estimated for the eight options range from $4,340,000 to $13,590,000. Reprocessing the tailings for uranium is sufficiently economically attractive to justify reprocessing in conjunction with each of the options

  17. Assessment of the radiological impact of the inactive uranium-mill tailings at Mexican Hat, Utah

    Energy Technology Data Exchange (ETDEWEB)

    Haywood, F.F.; Goldsmith, W.A.; Ellis, B.S.; Hubbard, H.M. Jr.; Fox, W.F.; Shinpaugh, W.H.

    1980-03-01

    High surface soil concentrations of /sup 226/Ra and high above-ground measurements of gamma-ray intensity in the vicinity of the inactive uranium-mill tailings at Mexican Hat show both wind and water erosion of the tailings. The former mill area, occupied by a trade school at the time of this survey, shows a comparatively high level of contamination, probably from unprocessed ore on the surface of the ore storage area near the location of the former mill buildings. However, the estimated health effect of exposure to gamma rays during a 2000-hr work year in the area represents an increase of 0.1% in the risk of death from cancer. Exposure of less than 600 persons within 1.6 km of the tailings to radon daughters results in an estimated 0.2%/year increase in risk of lung cancer.

  18. Assessment of the radiological impact of the inactive uranium-mill tailings at Mexican Hat, Utah

    International Nuclear Information System (INIS)

    Haywood, F.F.; Goldsmith, W.A.; Ellis, B.S.; Hubbard, H.M. Jr.; Fox, W.F.; Shinpaugh, W.H.

    1980-03-01

    High surface soil concentrations of 226 Ra and high above-ground measurements of gamma-ray intensity in the vicinity of the inactive uranium-mill tailings at Mexican Hat show both wind and water erosion of the tailings. The former mill area, occupied by a trade school at the time of this survey, shows a comparatively high level of contamination, probably from unprocessed ore on the surface of the ore storage area near the location of the former mill buildings. However, the estimated health effect of exposure to gamma rays during a 2000-hr work year in the area represents an increase of 0.1% in the risk of death from cancer. Exposure of less than 600 persons within 1.6 km of the tailings to radon daughters results in an estimated 0.2%/year increase in risk of lung cancer

  19. Engineering assessment of inactive uranium mill tailings, Grand Junction site, Grand Junction, Colorado. Phase II, Title I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through VIII). Cost estimates for the eight options range from $470,000 to $18,130,000. Reprocessing the tailings for uranium recovery does not appear to be economically attractive at present.

  20. Engineering assessment of inactive uranium mill tailings, Grand Junction site, Grand Junction, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through VIII). Cost estimates for the eight options range from $470,000 to $18,130,000. Reprocessing the tailings for uranium recovery does not appear to be economically attractive at present

  1. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    Matthews, M.L.; Mitzelfelt, R.

    1991-11-01

    This Remedial Action Plan (RAP) has been developed to serve a dual purpose. It presents the series of activities that is proposed by the US Department of Energy (DOE) to stabilize and control radioactive materials at the inactive Phillips/United Nuclear uranium processing site designated as the Ambrosia Lake site in McKinley County, New Mexico. It also serves to document the concurrence of both State of New Mexico and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state and concurrence by NRC, becomes Appendix B of the Cooperative Agreement

  2. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    International Nuclear Information System (INIS)

    1988-01-01

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project, as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs

  3. Engineering assessment of inactive uranium mill tailings, Tuba City site, Tuba City, Arizona. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-01-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Tuba City millsite in Arizona. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the tailings on the site constitutes the most significant environmental impact to the inhabited area near the site. In the downwind direction, to the northeast of the site, airborne radioactivity is greater than Federal guidelines but there are no dwellings in that direction in the area of concern. Gamma radiation is significant over the tailings but is near background levels in the housing area. The sparse population and relatively low radiation levels yield minimal immediate environmental impact; hence, the four alternative actions presented are directed towards restricting access to the site (Option I), and returning the windblown tailings to the pile and stabilizing the pile with cover material (Options II, III, and IV). Fencing around the site or the tailings pile and the removal or decontamination of mill buildings is included in all options. Option II provides 2 ft of cover material on the tailings, Option III provides 4 ft of cover, and Option IV provides 13 ft of cover. Costs of the options range from $671,000 to $2,904,000. Reprocessing the tailings for uranium is only marginally feasible and would require a more detailed economic evaluation before any action was taken

  4. Assessment of the radiological impact of the inactive uranium-mill tailings at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    Haywood, F.F.; Goldsmith, W.A.; Hubbard, H.M. Jr.; Fox, W.F.; Shinpaugh, W.H.

    1979-12-01

    Results of a radiological survey that was conducted at the inactive uranium-mill site at Monument Valley, Arizona, in March 1976, in cooperation with a team from Ford, Bacon and Davis Utah Inc., are presented. Consideration of these data and of previously published information on radiological conditions at the site lead to the conclusion that potential health effects from exposure to radionuclides in the mill tailings are relatively small. The occupants of three residences within 0.8 km (0.5 mile) of the tailings constitute the principal population at risk, but direct gamma-exposure rate measurements near the two residences closest to the tailings and calculations of radon dispersion indicate that the tailings do not raise either pathway of radiation exposure significantly above the background level. Data are not available to evaluate fully other possible exposure pathways, but the available information indicates that it is unlikely that doses through these pathways will add significantly to the total population dose. The low estimates of potential health effects from exposure to direct radiation and to exposure to radionuclides in the Monument Valley tailings piles are ascribed to the low 226 Ra inventory, to almost complete absence of small particles that are readily moved by wind and water, and to a small population in the vicinity of the tailings

  5. Summary of the engineering assessment of inactive uranium mill tailings, Spook Site, Converse County, Wyoming

    International Nuclear Information System (INIS)

    1981-10-01

    Ford, Bacon, Davis Utah Inc. has reevaluated the Spook site in order to revise the December 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings 48 mi northeast of Casper, in Converse County, Wyoming. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 187,000 tons of tailings at the Spook site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover materI), to rema densitometers for measuring cross-sectionally averaged mass velocity in steady steam-water flow are presented. The results are interpreted ntation

  6. Long-term ecological behaviour of abandoned uranium mill tailings. 1

    International Nuclear Information System (INIS)

    Kalin, M.

    1983-03-01

    Inactive uranium mill tailings were surveyed in the Province of Ontario to describe their surface characteristics, identify naturally invading biota, and determine essential chemical and physical parameters associated with the tailings. Inactive tailings sites can have wet areas, tailings completely covered with water, and dry areas. In the wet areas of most sites, wetland vegetation stands were found which were dominated by species of cattails (Typhaceae), along with some species of rushes (Juncaceae) and sedges (Cyperceae). Dry areas of the tailings exhibited a variety of surface features which are often a reflection of different amelioration efforts. Most of the indigenous species of vascular plants identified on dry areas of the tailings occurred only sporadically. Invading plants found on most sites were the tree species, trembling aspen (Populus tremuloides) and paper birch (Betula papyrifera). Elemental concentration and some physical characteristics of the tailings collected from a depth of 0-20 cm were determined. Uptake of heavy metals and radionuclides were evaluated in trees found in the dry areas and in cattails (Typha latifolia) in the wetland areas. Water bodies on tailings and surface water leaving the tailings, before and after treatment, were characterized in this survey. Aquatic bryophytes have invaded some water bodies on the tailings, and acid tolerant algae were evident in most of the water associated with the tailings. Ecological processes occurring on inactive uranium mill tailings which were identified in this survey are essential in evaluating the long-term fate of these waste sites

  7. Evaluation of inactive uranium mill tailings sites for liner requirements: Characterization and interaction of tailings, soil, and liner materials

    International Nuclear Information System (INIS)

    Relyea, J.F.; Martin, W.J.

    1982-01-01

    This paper summarizes the results of laboratory experiments using soils from Clive, Utah and tailings samples from three inactive uranium processing sites. The results are to be used to predict contaminant behavior for comparison with the regulatory criteria to decide whether a liner is needed. The interactions of leachates with soils and liner material were studied using both batch and column methods. It is determined that batch leaching tests are suitable for screening a large number of tailings samples for relative contaminant concentrations between samples but not for determining contaminant concentrations and release rates in tailings leachate. The results of column leaching tests on samples of tailings from inactive sites indicate that contaminant concentrations are highest in initial leachate from the columns and that concentrations decrease by an order of magnitude or more after one pore volume

  8. Liner evaluation for uranium mill tailings. Final report

    International Nuclear Information System (INIS)

    Buelt, J.L.

    1983-09-01

    The Liner Evaluation for Uranium Mill Tailings Program was conducted to evaluate the need for and performance of prospective lining materials for the long-term management of inactive uranium mill tailings piles. On the basis of program results, two materials have been identified: natural foundation soil amended with 10% sodium bentonite; catalytic airblown asphalt membrane. The study showed that, for most situations, calcareous soils typical of Western US sites adequately buffer tailings leachates and prevent groundwater contamination without additional liner materials or amendments. Although mathematical modeling of disposal sites is recommended on a site-specific basis, there appears to be no reason to expect significant infiltration through the cover for most Western sites. The major water source through the tailings would be groundwater movement at sites with shallow groundwater tables. Even so column leaching studies showed that contaminant source terms were reduced to near maximum contaminant levels (MCL's) for drinking water within one or two pore volumes; thus, a limited source term for groundwater contamination exists. At sites where significant groundwater movement or infiltration is expected and the tailings leachates are alkaline, however, the sodium bentonite or asphalt membrane may be necessary

  9. Summary of the Phase II, Title I, engineering assessment of inactive uranium mill tailings, Gunnison Site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Gunnison, Colorado. The Phase II--Title I services include the preparation of topographic measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 0.5 million tons of tailings at the Gunnison site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The nine alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through IX). Cost estimates for the nine options range from $480,000 to $5,890,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Appendix B to Attachment 3, lithologic logs

    International Nuclear Information System (INIS)

    1994-03-01

    This appendix contains the lithologic logs and monitor well construction information for the remedial action plan for uranium mill tailings sites at Slick Rock, CO. Data from each borehole is presented graphically and a stratigraphic description is given

  11. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1995-04-01

    The US Department of Energy (DOE) is responsible for performing remedial action to bring surface and ground water contaminant levels at 24 inactive uranium processing sites into compliance with the US Environmental Protection Agency (EPA) standards. DOE is accomplishing this through the Uranium Mill Tailings Remedial Action (UMTRA) Surface and Ground Water Projects. Remedial action will be conducted with the concurrence of the US Nuclear Regulatory Commission (NRC) and the full participation of affected states and Indian tribes. Uranium processing activities at most of 24 the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as uranium and nitrate. The purpose of the UMTRA Ground Water Project is to eliminate, or reduce to acceptable levels, the potential health and the environmental consequences of milling activities by meeting the EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance strategies. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently

  12. International developments in uranium mining and mill site remediation

    International Nuclear Information System (INIS)

    Quarch, H.; Kuhlmann, J.; Daroussin, J.L.; Poyser, R.W.

    1993-01-01

    At the end of production, mine sites, mill sites, tailings ponds, heap leaching residues in uranium mining districts world-wide have to be remediated in a responsible and sustainable manner in order to minimize long term environmental impacts. Current practice, regulatory environments and rehabilitation objectives in some of the most important uranium producing countries are briefly characterized as well as applicable radioprotection and geotechnical criteria. Important local and regional variables are outlined which determine optimal site specific solutions. Examples from Europe and North America are shown. Monitoring and control requirements as well as areas of current and necessary research and development are identified

  13. Summary of the engineering assessment of inactive uranium mill tailings, Naturita site, Naturita, Colorado

    International Nuclear Information System (INIS)

    1981-07-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Naturita site in order to revise the November 1977 engineering assessment of the problems resulting from the existence of radioactive contamination at the former uranium mill tailings site at Naturita, Colorado. This evaluation has included the preparation of topographic maps, the drilling of boreholes and radiometric measurements sufficient to determine areas and volumes of contaminated materials and radiation exposures of individuals and nearby populations, and the evaluation and costing of alternative remedial actions. Radon gas released from the estimated 344,000 tons of contaminated materials that remain at the Naturita site constitutes the most significant environmental impact, although external gamma radiation also is a factor. The two alternative actions presented in this engineering assessment are stabilization of the site in its present location with the addition of 3 m of stabilization cover material (Option I), and removal of residual radioactive materials to a disposal site and decontamination of the Naturita site (Option II). Cost estimates for the two options are about $7,200,000 for stabilization in-place, and about $8,200,000 for disposal at the Ranchers Exploration and Development Corporation's reprocessing site. Truck haulage would be used to transport the contaminated materials from the Naturita site to the selected disposal site.Ranchers Exploration and Development Corporation removed the tailings from the site, reprocessed them, and disposed of them from 1977 to 1979. There is no noteworthy mineral resource remaining at the former tailings site; therefore, recovery of residual mineral values was not considered in this assessment

  14. Bioassay for uranium mill tailings

    International Nuclear Information System (INIS)

    Tschaeche, A.N.

    1986-01-01

    Uranium mill tailings are composed of fine sand that contains, among other things, some uranium (U/sup 238/ primarily), and all of the uranium daughters starting with /sup 230/Th that are left behind after the usable uranium is removed in the milling process. Millions of pounds of tailings are and continue to be generated at uranium mills around the United States. Discrete uranium mill tailings piles exist near the mills. In addition, the tailings materials were used in communities situated near mill sites for such purposes as building materials, foundations for buildings, pipe runs, sand boxes, gardens, etc. The Uranium Mill Tailings Remedial Action Project (UMTRAP) is a U.S. Department of Energy Program designed with the intention of removing or stabilizing the mill tailings piles and the tailings used to communities so that individuals are not exposed above the EPA limits established for such tailings materials. This paper discusses the bioassay programs that are established for workers who remove tailings from the communities in which they are placed

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site in Lakeview, Oregon

    International Nuclear Information System (INIS)

    1994-10-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site in Lake view, Oregon evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site

  16. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site in Lakeview, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site in Lake view, Oregon evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site.

  17. Engineering assessment of inactive uranium mill tailings, Naturita site, Naturita, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Naturita, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings, the performance of radiometric measurements to determine the extent of radium contamination, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the costing of alternative corrective actions. Radon gas release from the 704,000 tons of tailings at the Naturita site constitutes the most significant environmental impact although windblown tailings and external gamma radiation are also factors. Ranchers Exploration and Development Company has been licensed by the State of Colorado to reprocess the tailings at a location 3 mi from the present site where they will be stabilized for long-term storage. The remedial action options include remedial action for structures in Naturita and Nucla (Option I) at an estimated cost of $270,000 and remedial action for structures and open land adjacent to the tailings site (Option II) at an estimated cost of $950,000

  18. Summary of the engineering assessment of inactive uranium mill tailings, Tuba City site, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1981-09-01

    Ford, Bacon and Davis Utah Inc. has reevaluated the Tuba City site in order to revise the March 1977 engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Tuba City, Arizona. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 0.8 million tons of tailings at the Tuba City site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to rema densitometers for measuring cross-sectionally averaged mass velocity in steady steam-water flow are presented. The results are interpreted ntation

  19. Engineering assessment of inactive uranium mill tailings, Lakeview Site, Lakeview, Oregon. Summary of Phase II, Title I

    International Nuclear Information System (INIS)

    1977-12-01

    Results are reported from an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Lakeview, Oregon site. Data ore included from the analyses of soil, water, and other samples; radiometric measurements to determine areas with radium-contaminated materials; evaluation of resulting radiation exposures of individuals and nearby populations; investigation of site geology, hydrology, and meteorology; and evaluation and costing of alternative corrective actions. Radon gas release from the 130,000 tons of tailings at the Lakeview site constitutes the main environmental impact, which is minimal. The two alternative actions presented are maintenance of the site now that the ARCO reclamation program has been completed (Option I); and addition of stabilization cover to a minimum depth of 2 ft, improved fencing, and removal of a few isolated spots of contamination (Option II). The cost estimates for these options are $40,000 and $290,000, respectively

  20. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  1. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1993-12-01

    This Baseline Risk Assessment of Groundwater Contamination at the Uranium Mill Tailings Site Near Gunnison, Colorado evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells. This risk assessment evaluates the most contaminated monitor wells at the processing site. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  2. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Tuba City site, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1977-01-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Tuba City millsite in Arizona. Services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the tailings on the site constitutes the most significant environmental impact to the inhabited area near the site

  3. Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring, and in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million for Option I and $2.45 million for Option II

  4. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    Energy Technology Data Exchange (ETDEWEB)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future.

  5. Status of activities on the inactive uranium mill tailings sites remedial action program. Office of the Assistant Secretary for Environment

    International Nuclear Information System (INIS)

    1981-04-01

    This report on the status of the Office of Environment's program for inactive uranium mill tailings sites is an analysis of the current status and a forecast of future activities of the Office of Environment. The termination date for receipt of information was September 30, 1980. Aerial radiological surveys and detailed ground radiological assessments of properties within the communities in the vicinity of the designated processing sites in Canonsburg, Pennsylvania, Salt Lake City, Utah, and Boise, Idaho led to the designation of an initial group of vicinity properties for remedial action. The potential health effects of the residual radioactive materials on or near these properties were estimated, and the Assistant Secretary for Environment recommended priorities for performing remedial action to the Department's Assistant Secretary for Nuclear Energy. In designating these properties and establishing recommended priorities for performing remedial action, the Office of Environment consulted with the Environmental Protection Agency, the Nuclear Regulatory Commission, representatives from the affected State and local governments, and individual property owners. After notifying the Governors of each of the affected States and the Navajo Nation of the Secretary of Energy's designation of processing sites within their areas of jurisdiction and establishment of remedial action priorities, a Sample Cooperative Agreement was developed by the Department in consultation with the Nuclear Regulatory Commission and provided to the affected States and the Navajo Nation for comments. During September 1980, a Cooperative Agreement with the Commonwealth of Pennsylvania for the designated Canonsburg processing site was executed by the Department. It is anticipated that a Cooperative Agreement between the State of Utah and the Department to perform remedial actions at the designated Salt Lake City site will be executed in the near future

  6. Engineering assessment of inactive uranium mill tailings, Maybell Site, Maybell, Colorado. Summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Maybell, Colorado. The Phase II-Title I services include the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings and radiometric measurements to determine radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.6 million tons of tailings at the Maybell site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The three alternative actions presented range from fencing and maintenance (Option I), to placing the tailings in an open-pit mine and adding 2 ft of stabilization cover material (Option III). Cost estimates for the three options range from $250,000 to $4,520,000. Reprocessing the tailings for uranium does not appear to be economically attractive at present

  7. Engineering assessment of inactive uranium mill tailings, Mexican Hat site, Mexican Hat, Utah. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-01-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Mexican Hat millsite in Utah. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 2,200,000 tons of tailings on the site constitutes the most significant environmental impact. The six alternative actions presented are directed towards restricting access to the site (Option I), returning the windblown tailings to the piles and stabilizing the piles with cover material (Options II, III, and IV), and consolidating the two piles into one pile and stabilizing it with cover material (Options V and VI). Fencing around the site or the tailings and the decontamination of mill buildings is included in all options. Options II and V provide 2 ft of cover material on the tailings, Options III, IV, and VI provide 4 ft, 13 ft, and 10 ft of cover, respectively. Costs of the options range from $370,000 to $4,390,000. Reprocessing the tailings for uranium is not feasible at present

  8. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailing, Riverton Site, Riverton, Wyoming

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Riverton, Wyoming site. The soil, water and other sample analyses; radiometric measurements to determine areas with radium-contaminated materials; the evaluation of resulting radiation exposures of individuals and nearby populations; the investigation of site geology, hydrology, and meteorology; and the evaluation and costing of alternative corrective actions. Radon gas release from the 900,000 tons of tailings at the Riverton site constitutes the main environmental impact. The two alternative actions presented are fencing and maintenance of the site and off-site remedial action, and decontamination of the millsite and ore storage areas and additional stabilization cover to a minimum of 2 ft. The cost estimates for the options are $460,000 and $1,140,000, respectively. Estimated costs for moving the tailings and all contaminated materials to unspecified sites 5 and 10 mi from the present location are $6,000,000 and $6,400,000, respectively

  9. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-10-01

    Diffusion coefficients for radon gas in earthen materials are required to design suitable radon-barrier covers for uranium tailings impoundments and other materials that emit radon gas. Many early measurements of radon diffusion coefficients relied on the differences in steady-state radon fluxes measured from radon source before and after installation of a cover layer of the material being tested. More recent measurements have utilized the small-sample transient (SST) technique for greater control on moistures and densities of the test soils, greater measurement precision, and reduced testing time and costs. Several of the project sites for the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Program contain radiologically contaminated subsurface material composed predominantly of cobbles, gravels andsands. Since remedial action designs require radon diffusion coefficients for the source materials as well as the cover materials, these cobbly and gravelly materials also must be tested. This report contains the following information: a description of the test materials used and the methods developed to conduct the SST radon diffusion measurements on cobbly soils; the protocol for conducting radon diffusion tests oncobbly soils; the results of measurements on the test samples; and modifications to the FITS computer code for analyzing the time-dependent radon diffusion data

  10. Critical management issues for the Uranium Mill Tailings Remedial Action (UMTRA) Project

    International Nuclear Information System (INIS)

    Themelis, J.G.; Krishnan, K.R.

    1985-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (PL95-604) authorized the Secretary of Energy to enter into cooperative agreements with certain states and Indian Tribes to clean up 24 inactive uranium mill tailing sites and associated vicinity properties. The Uranium Mill Tailings Remedial Action (UMTRA) Project includes the three Federal agencies (EPA, DOE, and NRC), eleven state, Indian Tribes, and at least four major contractors. The UMTRA Project extends over a period of ten years. The standards for the Project require a design life of 1000 years with a minimum performance period of 200 years. This paper discusses the critical management issues in dealing with the UMTRA Project and identifies the development of solutions for many of those issues. The highlights to date are promulgation of EPA standards, continued support from Congress and participating states and Indian Tribes, significant leadership shown at all levels, establishment of credibility with the public, and continued motivation of the team. The challenge for tomorrow is making certain NRC will license the sites and maintaining the high level of coordination exhibited to date to assure Project completion on schedule

  11. Denitrification in groundwater at uranium mill tailings sites

    International Nuclear Information System (INIS)

    Goering, Timothy J.; Groffman, Armando; Thomson, Bruce

    1992-01-01

    Nitrates are a major contaminant in groundwater at many Uranium Mill Tailings Remedial Action (UMTRA) sites. Microbial denitrification, the transformation of nitrate to nitrogen gas, may be occurring in groundwater at several UMTRA sites. Denitrification is a biologically mediated process whereby facultative anaerobes use nitrate for respiration under anaerobic conditions. Denitrifying bacteria are ubiquitous in soils, sediments, and water. Denitrification requires nitrate, organic carbon, oxygen-limiting conditions, and trace nutrients, especially phosphorus. The lack of organic carbon is the most common limiting factor for denitrification. Denitrification occurs under a limited range of temperature and pH. The uranium milling processes used at UMTRA sites provided a readily available source of carbon and nitrates for denitrifying bacteria. At the Maybell, Colorado, site, the denitrifying organisms Pseudomonas, Flavobacterium and Acinetobacter were identified in core samples of materials from beneath the tailings. In addition, microcosm experiments simulating aquifer conditions beneath the tailings pile showed an average 40 percent decrease in nitrate concentrations over 13 days. At the New Rifle, Colorado, site, aquifer conditions appear favorable for denitrification. Nitrate and organic carbon are readily available in the groundwater, and redox conditions beneath and downgradient of the tailings pile are relatively anoxic. Downgradient from the tailings, total nitrogen is being removed from the groundwater system at a greater rate than the geochemically conservative anion, chloride. This removal may be due to denitrification and adsorption of ammonium onto clay and silt particles. (author)

  12. Denitrification in groundwater at uranium mill tailings sites

    Energy Technology Data Exchange (ETDEWEB)

    Goering, Timothy J [Jacobs Engineering Group, Inc., Albuquerque, NM (United States); Groffman, Armando [Roy F. Weston, Inc., Albuquerque, NM (United States); Thomson, Bruce [University of New Mexico, Albuquerque, NM (United States)

    1992-07-01

    Nitrates are a major contaminant in groundwater at many Uranium Mill Tailings Remedial Action (UMTRA) sites. Microbial denitrification, the transformation of nitrate to nitrogen gas, may be occurring in groundwater at several UMTRA sites. Denitrification is a biologically mediated process whereby facultative anaerobes use nitrate for respiration under anaerobic conditions. Denitrifying bacteria are ubiquitous in soils, sediments, and water. Denitrification requires nitrate, organic carbon, oxygen-limiting conditions, and trace nutrients, especially phosphorus. The lack of organic carbon is the most common limiting factor for denitrification. Denitrification occurs under a limited range of temperature and pH. The uranium milling processes used at UMTRA sites provided a readily available source of carbon and nitrates for denitrifying bacteria. At the Maybell, Colorado, site, the denitrifying organisms Pseudomonas, Flavobacterium and Acinetobacter were identified in core samples of materials from beneath the tailings. In addition, microcosm experiments simulating aquifer conditions beneath the tailings pile showed an average 40 percent decrease in nitrate concentrations over 13 days. At the New Rifle, Colorado, site, aquifer conditions appear favorable for denitrification. Nitrate and organic carbon are readily available in the groundwater, and redox conditions beneath and downgradient of the tailings pile are relatively anoxic. Downgradient from the tailings, total nitrogen is being removed from the groundwater system at a greater rate than the geochemically conservative anion, chloride. This removal may be due to denitrification and adsorption of ammonium onto clay and silt particles. (author)

  13. Engineering assessment of inactive uranium mill tailings, Rifle Site, Rifle, Colorado. Summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Rifle, Colorado. The Phase II - Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 3.1 million tons of tailings at the two Rifle sites, constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The 15 alternative remedial action options presented range from millsite decomtamination and off-site remedial action (Options I and IV), to adding various depths of stabilization cover material (Options II, V, VI, and VII), to removal of the tailings to long-term storage sites and decontamination of the present sites (Options III and VIII through XV). Cost estimates for the first 14 options range from $224,000 to $20,300,000. Option XV, estimated at $32,200,000, includes the cost for moving both Rifle tailings piles and the Grand Junction tailings pile to DeBeque for long-term storage and site decontamination after removal of the piles. Reprocessing of the tailings for uranium appears to be economically attractive at present

  14. Engineering assessment of inactive uranium mill tailings new and old Rifle site, Rifle, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Rifle, Colorado. The Phase II--Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 3.1 million tons of tailings at the two Rifle sites, constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The 15 alternative remedial action options presented range from millsite decontamination and off-site remedial action (Options I and IV), to adding various depths of stabilization cover material (Options II, V, VI and VII), to removal of the tailings to long-term storage sites and decontamination of the present sites (Options III and VIII through XV). Cost estimates for the first 14 options range from $224,000 to $20,300,000. Option XV, estimated at $32,200,000, includes the cost for moving both Rifle tailings piles and the Grand Junction tailings pile to DeBeque for long-term storage and site decontamination after removal of the piles. Reprocessing of the tailings for uranium appears to be economically attractive at present

  15. Engineering assessment of inactive uranium mill tailings new and old Rifle site, Rifle, Colorado. Phase II, Title I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Rifle, Colorado. The Phase II--Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 3.1 million tons of tailings at the two Rifle sites, constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The 15 alternative remedial action options presented range from millsite decontamination and off-site remedial action (Options I and IV), to adding various depths of stabilization cover material (Options II, V, VI and VII), to removal of the tailings to long-term storage sites and decontamination of the present sites (Options III and VIII through XV). Cost estimates for the first 14 options range from $224,000 to $20,300,000. Option XV, estimated at $32,200,000, includes the cost for moving both Rifle tailings piles and the Grand Junction tailings pile to DeBeque for long-term storage and site decontamination after removal of the piles. Reprocessing of the tailings for uranium appears to be economically attractive at present.

  16. Phase II, Title I engineering assessment of inactive uranium mill tailings, Green River Site, Green River, Utah

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Green River site, Utah. Services included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations , the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 123 thousand tons of tailings at the Green River site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The three alternative actions presented are dike stabilization, fencing, on- and off-site decontamination and maintenance (Option I); improvements in the stabilization cover and diking plus cleanup of the site and Browns Wash, and realignment of Browns Wash (Option II); and addition of stabilization cover to a total of 2 ft, realignment of Browns Wash and placement of additional riprap, on-site cleanup and drainage improvements (Option III). All options include remedial action at off-site structures. Cost estimates for the three options range from $700,000 to $926,000

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    International Nuclear Information System (INIS)

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protection strategy for the Bodo Canyon disposal site are presented in this document

  18. Engineering assessment of inactive uranium mill tailings, Slick Rock sites, Slick Rock, Colorado. Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the two millsites in Slick Rock, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. The Union Carbide site has 350,000 tons of tailings and the North Continent site now owned by Union Carbide has 37,000 tons of tailings. Both tailings piles have been stabilized in accordance with regulations of the State of Colorado. Radon gas release from the tailings on the sites constitute the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The sparse population and relatively low radiation levels yield minimal immediate environmental impact. Hence the three alternative actions presented are directed towards restricting access to the sites (Option I), and returning the windblown tailings to the piles and stabilizing the piles with cover material (Option II), and consolidating the two piles on the UC site and stabilizing with 2 ft of cover (Option III). Fencing around the tailings piles is included in all options. Options II and III provide 2 ft of cover material on the tailings. Costs of the options range from $370,000 to $1,100,000. Reprocessing the tailings for uranium is not economically feasible

  19. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project

  20. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978, hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the processing sites and on vicinity properties (VPs) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the ground water from further degradation. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the processing sites on land administered by the US Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project.

  1. Baseline risk assessment of ground water contamination at the uranium mill tailings site Salt Lake City, Utah

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site.

  2. Baseline risk assessment of ground water contamination at the uranium mill tailings site Salt Lake City, Utah

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment of groundwater contamination at the uranium mill tailings site near Salt Lake City, Utah, evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium ore processing site. The tailings and other contaminated material at this site were placed in a disposal cell located at Clive, Utah, in 1987 by the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate residual ground water contamination at the former uranium processing site, known as the Vitro processing site. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine the appropriate remedial action for contaminated ground water at the site

  3. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This document evaluates potential impacts to public health and the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1989 by the US DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, UMTRA Project is evaluating ground water contamination in this risk assessment.

  4. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah

    International Nuclear Information System (INIS)

    1994-09-01

    This document evaluates potential impacts to public health and the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1989 by the US DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, UMTRA Project is evaluating ground water contamination in this risk assessment

  5. UMTRA [Uranium Mill Tailings Remedial Action] Project site management manual

    International Nuclear Information System (INIS)

    1990-10-01

    The purpose of this manual is to summarize the organizational interfaces and the technical approach used to manage the planning, design development, National Environmental Policy Act (NEPA) compliance, engineering, and remedial action required to stabilize and control the designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites. This manual describes the Project's objective, participants' roles and responsibilities, technical approach for accomplishing the objective, and planning and managerial controls to be used in performing the site work. The narrative follows the flow of activities depicted in Figure 1.1, which provides the typical sequence of key Project activities. A list of acronyms used is presented at the end of the manual. The comparable manual for UMTRA Project vicinity properties is the ''Vicinity Properties Management and Implementation Manual'' (VPMIM) (UMTRA-DOE/AL-050601). Together, the two manuals cover the remedial action activities associated with UMTRA Project sites. The UMTRA Project's objective is to stabilize and control the uranium mill tailings, vicinity property materials, and other residual radioactive materials at the designated sites (Figure 1.2) in a safe and environmentally sound manner in order to minimize radiation health hazards to the public. 26 figs., 6 tabs

  6. Alternative management techniques for the uranium mill tailings site at Salt Lake City, UT

    International Nuclear Information System (INIS)

    Rogers, V.C.; Goldsmith, W.A.; Haywood, F.F.; Gantner, G.K.

    1976-01-01

    The concentrations of 226 Ra and other uranium-chain radionuclides present in tailings piles at uranium-milling sites are on the order of 10 3 times higher than those usually found in soil-surface minerals. The public radiation exposure attributable to these sites is primarily due to inhalation of 222 Rn progeny. This paper presents the radiological assessment of the uranium-milling site at Salt Lake City, Utah. Adverse health effects are estimated from present and projected public radiation exposures. Three alternative remedial action measures can be used to reduce radiation exposures: (1) decontamination of offsite areas contaminated by tailings materials; (2) covering the tailings with contamination-free material; and (3) removal of the tailings to a more remote location. These three measures are examined in terms of costs incurred and serious health effects avoided

  7. Project licensing plan for UMTRA [Uranium Mill Tailings Remedial Action] sites

    International Nuclear Information System (INIS)

    1984-07-01

    The purpose of the Uranium Mill Tailings Remedial Action (UMTRA) Project Licensing Plan is to establish how a disposal site will be licensed, and to provide responsibilities of participatory agencies as legislated by the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 (Public Law 95-604). This Plan has been developed to ensure that the objectives of licensing are met by identifying the necessary institutional controls, participatory agency responsibilities, and key milestones in the licensing process. The Plan contains the legislative basis for and a description of the licensing process (''Process'') for UMTRA sites. This is followed by a discussion of agency responsibilities, and milestones in the Process. The Plan concludes with a generic timeline of this Process. As discussed in Section 2.1, a custodial maintenance and surveillance plan will constitute the basis for a site license. The details of maintenance and surveillance are discussed in the Project Maintenance and Surveillance Plan (AL-350124.0000). 5 refs., 4 figs

  8. Information needs for demonstrating compliance with groundwater aspects of 40 CFR 192 for uranium mill tailings remedial action programs

    International Nuclear Information System (INIS)

    Logsdon, M.J.; Verma, T.R.; Martin, D.E.

    1984-01-01

    Public Law 95-604, the Uranium Mill Tailings Radiation Control Act of 1978, provides the Department of Energy with authority to perform remedial actions at designated inactive uranium-mill sites. The Environmental Protection Agency promulgated radiological and non-radiological standards (40 CFR 192) for remedial actions at inactive uranium-mill sites. All remedial actions require the concurrence of the Nuclear Regulatory Commission. Subpart C of 40 CFR 192 addresses the control of pollutants in groundwater at sites for which remedial action is proposed pursuant to P.L 95-604. As the authors interpret the regulation, it is essentially an admonition to carefully evaluate what is useful and practicable to deal with existing contamination and to control potential future contamination. In reviewing groundwater aspects of Uranium Mill Tailings Remedial Action documents, current NRC experience shows that the reports should address the following information needs: (1) The need to identify the physical and chemical nature of the present groundwater flow system in sufficient detail to provide a reasonable expectation that the extent and value of the groundwater resource to be protected is understood adequately; (2) The need to identify reasonable foreseeable events, both natural and man-made, that could alter the present groundwater flow system and the effects of such changes on the definition of the protected zone; (3) The need to identify current groundwater use within the protected zone; (4) The need to identify site-specific models, boundary conditions, and representative values of system parameters to predict with reasonable assurance that the proposed actions will protect groundwater and surface water resources for the design period of 200 - 1000 years

  9. Phase II, Title I engineering assessment of inactive uranium mill tailings, Monument Valley site, Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1977-01-01

    An engineering assessment was made of the problems resulting from the existence of radioactive uranium mill tailings at the Monument Valley millsite in Arizona. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the tailings on the site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The sparse population and relatively low radiation levels yield minimal immediate environmental impact; hence, the two alternative actions presented are directed towards restricting access to the site and returning the windblown tailings to the pile and stabilizing the pile. Both options include remedial action costs for offsite locations where tailings have been placed. Cost estimates for the two options are $585,000 and $1,165,000

  10. Remedial action plan and site design for stabilization of the inactive uranium mill tailings site at Tuba City, Arizona

    International Nuclear Information System (INIS)

    1989-08-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities which are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site near Tuba City, Arizona. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the Navajo Nation, the Hopi Tribe, US Bureau of Indian Affairs (BIA), and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by DOE, the Navajo Nation, and the Hopi Tribe, and concurrence by NRC, becomes Appendix B of the Cooperative Agreement. Following the introduction, contents are as follows: Section 2.0 presents the EPA standards, including a discussion of their objectives. Section 3.0 summarizes the present site characteristics and provides a definition of site-specific problems. Section 4.0 is the site design for the proposed action. Section 5.0 summarizes the plan for ensuring environmental, health, and safety protection for the surrounding community and the on-site workers. Section 6.0 presents a detailed listing of the responsibilities of the project participants. Section 7.0 describes the features of the long-term surveillance and maintenance plan. Section 8.0 presents the quality assurance aspects of the project. Section 9.0 documents the ongoing activities to keep the public informed and participating in the project

  11. Engineering assessment of inactive uranium mill tailings, Grand Junction site, Grand Junction, Colorado. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Grand Junction, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.9 million tons of tailings at the Grand Junction site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from millsite decontamination (Option I), to adding various depths of stabilization cover material (Options II and III), to removal of the tailings to long-term storage sites and decontamination of the present site (Options IV through VIII). Cost estimates for the eight options range from $470,000 to $18,130,000. Reprocessing the tailings for uranium recovery does not appear to be economically attractive at present

  12. Long-term ecological behaviour of abandoned uranium mill tailings

    International Nuclear Information System (INIS)

    Kalin, Margarete

    1984-12-01

    Semi-aquatic and terrestrial areas on abandoned or inactive uranium mill tailings in Ontario were studied in order to identify the growth characteristics of the naturally invading species dominating these areas. Semi-aquatic areas of tailings sites have been invaded by cattails. These species formed wetland communities which varied in size, but all were essentially monocultures of Typha latifolia, T. angustifolia, or of the hybrids T. glauca. Sedges, Scripus cyperinus (wool-grass) and Phragmites australis (reed-grass), were found in transition zones between the cattail stand and the dry section of the tailings site. The expansion of the cattail stands appeared to be controlled by the hydrological conditions on the site, rather than the chemical characteristics of the tailings

  13. Engineering assessment of inactive uranium mill tailings, Durango site, Durango, Colorado. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Durango, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 1.555 million tons of tailings at the Durango site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The eight alternative actions presented range from vegetative stabilization (Option I), to contouring and stabilizing in-place with varying depths of cover material (Options II and III), to removal to an isolated long-term disposal site (Options V to VIII). All options include remedial action costs for offsite locations where tailings have been placed. Costs estimated for the eight options range from $4,340,000 to $13,590,000. Reprocessing the tailings for uranium is sufficiently economically attractive to justify reprocessing in conjunction with each of the options

  14. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1994-11-01

    This baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado, evaluates potential public health and environmental impacts resulting from ground water contamination at the former North Continent (NC) and Union Carbide (UC) uranium mill processing sites. The tailings at these sites will be placed in a disposal cell at the proposed Burro Canyon, Colorado, site. The US Department of Energy (DOE) anticipates the start of the first phase remedial action by the spring of 1995 under the direction of the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project will evaluate ground water contamination. This baseline risk assessment is the first site-specific document for these sites under the Ground Water Project. It will help determine the compliance strategy for contaminated ground water at the site. In addition, surface water and sediment are qualitatively evaluated in this report

  15. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This baseline risk assessment of ground water contamination at the uranium mill tailings sites near Slick Rock, Colorado, evaluates potential public health and environmental impacts resulting from ground water contamination at the former North Continent (NC) and Union Carbide (UC) uranium mill processing sites. The tailings at these sites will be placed in a disposal cell at the proposed Burro Canyon, Colorado, site. The US Department of Energy (DOE) anticipates the start of the first phase remedial action by the spring of 1995 under the direction of the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project will evaluate ground water contamination. This baseline risk assessment is the first site-specific document for these sites under the Ground Water Project. It will help determine the compliance strategy for contaminated ground water at the site. In addition, surface water and sediment are qualitatively evaluated in this report.

  16. Remedial Action Plan and Site design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Revision 1. Remedial action selection report, Attachment 2, geology report, Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC {section}7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management.

  17. Remedial Action Plan and Site design for stabilization of the inactive Uranium Mill Tailings sites at Slick Rock, Colorado: Revision 1. Remedial action selection report, Attachment 2, geology report, Attachment 3, ground water hydrology report, Attachment 4, water resources protection strategy. Final

    International Nuclear Information System (INIS)

    1995-09-01

    The Slick Rock uranium mill tailings sites are located near the small community of Slick Rock, in San Miguel County, Colorado. There are two designated Uranium Mill Tailings Remedial Action (UMTRA) Project sites at Slick Rock: the Union Carbide site and the North Continent site. Both sites are adjacent to the Dolores River. The sites contain former mill building concrete foundations, tailings piles, demolition debris, and areas contaminated by windblown and waterborne radioactive materials. The total estimated volume of contaminated materials is approximately 621,000 cubic yards (475,000 cubic meters). In addition to the contamination at the two processing site areas, 13 vicinity properties were contaminated. Contamination associated with the UC and NC sites has leached into ground water. Pursuant to the requirements of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC section 7901 et seq.), the proposed remedial action plan (RAP) will satisfy the final US Environmental Protection Agency (EPA) standards in 40 CFR Part 192 (60 FR 2854) for cleanup, stabilization, and control of the residual radioactive material (RRM) (tailings and other contaminated materials) at the disposal site at Burro Canyon. The requirements for control of the RRM (Subpart A) will be satisfied by the construction of an engineered disposal cell. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/weaterborne materials to a permanent repository at the Burro Canyon disposal site. The site is approximately 5 road mi (8 km) northeast of the mill sites on land recently transferred to the DOE by the Bureau of Land Management

  18. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Canonsburg, Pennsylvania. Revision 1

    International Nuclear Information System (INIS)

    1995-11-01

    For the UMTRA Project site located near Canonsburg, Pennsylvania (the Canonsburg site), the Surface Project cleanup occurred from 1983 to 1985, and involved removing the uranium processing mill tailings and radioactively contaminated soils and materials from their original locations and placing them in a disposal cell located on the former Canonsburg uranium mill site. This disposal cell is designed to minimize radiation emissions and further contamination of ground water beneath the site. The Ground Water Project will evaluate the nature and the extent of ground water contamination resulting from uranium processing at the former Canonsburg uranium mill site, and will determine a ground water strategy for complying with the US Environmental Protection Agency's (EPA) ground water standards established for the UMTRA Project. For the Canonsburg site, an evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people's health. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Canonsburg site. The results of this report and further site characterization of the Canonsburg site will be used to determine how to protect public health and the environment, and how to comply with the EPA standards

  19. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Canonsburg, Pennsylvania. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    For the UMTRA Project site located near Canonsburg, Pennsylvania (the Canonsburg site), the Surface Project cleanup occurred from 1983 to 1985, and involved removing the uranium processing mill tailings and radioactively contaminated soils and materials from their original locations and placing them in a disposal cell located on the former Canonsburg uranium mill site. This disposal cell is designed to minimize radiation emissions and further contamination of ground water beneath the site. The Ground Water Project will evaluate the nature and the extent of ground water contamination resulting from uranium processing at the former Canonsburg uranium mill site, and will determine a ground water strategy for complying with the US Environmental Protection Agency`s (EPA) ground water standards established for the UMTRA Project. For the Canonsburg site, an evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Canonsburg site. The results of this report and further site characterization of the Canonsburg site will be used to determine how to protect public health and the environment, and how to comply with the EPA standards.

  20. Remedial action plan and site conceptual design for stabilization of the inactive uranium mill tailings site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1991-11-01

    This volume deals with the main construction subcontract for the uranium mill tailings remedial action of Ambrosia Lake, New Mexico. Contents of subcontract documents AMB-4 include: bidding requirements; terms and conditions; specifications which cover general requirements and sitework; and subcontract drawings

  1. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Spook Site, Converse County, Wyoming

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Riverton, Wyoming site. The services include: the performance of core drillings; soil, water and other sample analyses; radiometric measurements to determine areas with radium-contaminated materials; the evaluation of resulting radiation exposures of individuals and nearby populations; the investigation of site geology, hydrology, and meteorology; and the evaluation and costing of alternative corrective actions. Radon gas release from the 900,000 tons of tailings at the Riverton site constitutes the main environmental impact. The two alternative actions presented are fencing and maintenance of the site and off-site remedial action and decontamination of the millsite and ore storage areas and additional stabilization cover to a minimum of 2 ft. The cost estimates for the options are $460,000 and $1,140,000, respectively. Estimated costs for moving the tailings and all contaminated materials to unspecified sites 5 and 10 mi from the present location are $6,000,000 and $6,400,000, respectively

  2. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd{sup 3}) (2.1 million cubic meters [m{sup 3}]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd{sup 3} (15,000 m{sup 3}) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd{sup 3} (420,000 m{sup 3}). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd{sup 3} (2.58 million m{sup 3}). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations.

  3. Remedial Action Plan and Site Design for Stabilization of the Inactive Uranium Mill Tailings Site, Maybell, Colorado. Remedial action selection report: Attachment 2, Geology report, Final

    International Nuclear Information System (INIS)

    1994-06-01

    The Maybell uranium mill tailings site is 25 miles (mi) (40 kilometers [km]) west of the town of Craig, Colorado, in Moffat County, in the northwestern part of the state. The unincorporated town of Maybell is 5 road mi (8 km) southwest of the site. The designated site covers approximately 110 acres (ac) (45 hectares [ha]) and consists of a concave-shaped tailings pile and rubble from the demolition of the mill buildings buried in the former mill area. Contaminated materials at the Maybell processing site include the tailings pile, which has an average depth of 20 feet (ft) (6 meters [m]) and contains 2.8 million cubic yards (yd 3 ) (2.1 million cubic meters [m 3 ]) of tailings. The former mill processing area is on the north side of the site and contains 20,000 yd 3 (15,000 m 3 ) of contaminated demolition debris. Off-pile contamination is present and includes areas adjacent to the tailings pile, as well as contamination dispersed by wind and surface water flow. The volume of off-pile contamination to be placed in the disposal cell is 550,000 yd 3 (420,000 m 3 ). The total volume of contaminated materials to be disposed of as part of the remedial action is estimated to be 3.37 million yd 3 (2.58 million m 3 ). Information presented in this Final Remedial Action Plan (RAP) and referenced in supporting documents represents the current disposal cell design features and ground water compliance strategy proposed by the US Department of Energy (DOE) for the Maybell, Colorado, tailings site. Both the disposal cell design and the ground water compliance strategy have changed from those proposed prior to the preliminary final RAP document as a result of prudent site-specific technical evaluations

  4. Phase II, Title I engineering assessment of inactive uranium mill tailings, Phillips/United Nuclear Site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Phillips/United Nuclear site at Ambrosia Lake, New Mexico. Services included the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings, and radiometric measurements to determine radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.6 million tons of tailings at the Phillips/United Nuclear site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The estimated radiological health effects to the general population are considered to be minimal. The two alternative actions presented are: dike stabilization, fencing, and maintenance; and adding 2 ft of stabilization cover material. Both options include remedial action at off-site structures and on-site decontamination around the tailings pile. Cost estimates for the two options are $920,000 and $2,230,000, respectively

  5. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Falls City Site, Falls City, Texas

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at Falls City, Texas. Services included taking soil samples, the performance of radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.5 million tons of tailings at the Falls City site constitutes the most significant environmental impact. Windblown tailings, external gamma radiation and localized contamination of surface waters are other environmental effects. The two alternative remedial action options presented include on-site and off-site cleanup, fencing, and hydrological monitoring and, in addition, stabilization of pile 2 with 2 ft of cover material. The costs are $1.84 million and $2.45 million

  6. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Tuba City, Arizona

    International Nuclear Information System (INIS)

    1994-06-01

    This document evaluates potential public health or environmental impacts resulting from ground water contamination at the former uranium mill site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1990 by the US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document under the Ground Water Project. It will help determine what remedial actions are necessary for contaminated ground water at the site

  7. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers.

  8. Environmental assessment of remedial action at the Naturita uranium processing site near Naturita, Colorado: Revision 5

    International Nuclear Information System (INIS)

    1994-10-01

    Title 1 of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law (PL) 95-604, authorized the US Department of Energy (DOE) to perform remedial action at the inactive Naturita, Colorado, uranium processing site to reduce the potential health effects from the radioactive materials at the site and at vicinity properties associated with the site. Title 2 of the UMTRCA authorized the US Nuclear Regulatory Commission (NRC) or agreement state to regulate the operation and eventual reclamation of active uranium processing sites. The uranium mill tailings at the site were removed and reprocessed from 1977 to 1979. The contaminated areas include the former tailings area, the mill yard, the former ore storage area, and adjacent areas that were contaminated by uranium processing activities and wind and water erosion. The Naturita remedial action would result in the loss of 133 acres (ac) of contaminated soils at the processing site. If supplemental standards are approved by the NRC and the state of Colorado, approximately 112 ac of steeply sloped contaminated soils adjacent to the processing site would not be cleaned up. Cleanup of this contamination would have adverse environmental consequences and would be potentially hazardous to remedial action workers

  9. Decision-tree approach to evaluating inactive uranium-processing sites for liner requirements

    International Nuclear Information System (INIS)

    Relyea, J.F.

    1983-03-01

    Recently, concern has been expressed about potential toxic effects of both radon emission and release of toxic elements in leachate from inactive uranium mill tailings piles. Remedial action may be required to meet disposal standards set by the states and the US Environmental Protection Agency (EPA). In some cases, a possible disposal option is the exhumation and reburial (either on site or at a new location) of tailings and reliance on engineered barriers to satisfy the objectives established for remedial actions. Liners under disposal pits are the major engineered barrier for preventing contaminant release to ground and surface water. The purpose of this report is to provide a logical sequence of action, in the form of a decision tree, which could be followed to show whether a selected tailings disposal design meets the objectives for subsurface contaminant release without a liner. This information can be used to determine the need and type of liner for sites exhibiting a potential groundwater problem. The decision tree is based on the capability of hydrologic and mass transport models to predict the movement of water and contaminants with time. The types of modeling capabilities and data needed for those models are described, and the steps required to predict water and contaminant movement are discussed. A demonstration of the decision tree procedure is given to aid the reader in evaluating the need for the adequacy of a liner

  10. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site.

  11. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Riverton, Wyoming

    International Nuclear Information System (INIS)

    1994-09-01

    This Risk Assessment evaluated potential impacts to public health or the environment caused by ground water contamination at the former uranium mill processing site. In the first phase of the U.S. Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project, the tailing and other contaminated material at this site were placed in a disposal cell near the Gas Hills Plant in 1990. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first site-specific document to evaluate potential health and environmental risks for the Riverton site under the Ground Water Project; it will help determine whether remedial actions are needed for contaminated ground water at the site

  12. Waste minimization opportunities at the U.S. Uranium Mill Tailings Remedial Action (UMTRA) Project, Rifle, Colorado, site

    International Nuclear Information System (INIS)

    Hartmann, G.L.; Arp, S.; Hempill, H.

    1993-01-01

    At two uranium mill sites in Rifle, Colorado, the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is removing uranium mill tailings and contaminated subgrade soils. This remediation activity will result in the production of groundwater contaminated with uranium, heavy metals, ammonia, sulfates, and total dissolved solids (TDS). The initial remediation plan called for a wastewater treatment plant for removal of the uranium, heavy metals, and ammonia, with disposal of the treated water, which still includes the sulfates and TDSS, to the Colorado River. The National Pollutant Discharge Elimination (NPDES) permit issued by the Colorado Department of Health for the two Rifle sites contained more restrictive discharge limits than originally anticipated. During the detailed review of alternate treatment systems to meet these more restrictive limits, the proposed construction procedures were reviewed emphasizing the methods to minimize groundwater production to reduce the size of the water treatment facility, or to eliminate it entirely. It was determined that with changes to the excavation procedures and use of the contaminated groundwater for use in dust suppression at the disposal site, discharge to the river could be eliminated completely

  13. Pollution of ground water due to inactive uranium mill tailings. Summary of progress, October 1, 1979-September 30, 1981

    International Nuclear Information System (INIS)

    1980-01-01

    An extensive program of characterization of several inactive uranium tailings piles has been carried out in the past year. The geotechnical engineering program conducted a drilling program at the Salt Lake City and Grand Junction sites. The locations of slimes and sands in these sites hve been characterized. In general, it was found that slimes exist in the impoundments in lower percentages than normally produced from mill tailings. Permeability tests were conducted yielding values ranging from 10 -3 cm/sec to 10 -6 cm/sec. The geochemical studies made considerable progress in the past year. Extensive sampling of several sites was conducted. Sampling programs have been completed for seven sites and are underway for nine other sites. The work to date has indicated the importance of salts in controlling the direction and rate of movement of contaminants. The work has also indicated that a number of non-radioactive elements such as As are of environmental importance. The work also indicates the importance of the fact that the tailings piles are out of chemical equilibrium with their environment. Computer software was developed and implemented for data storage and retrieval. Automation hardware was installed and tested for the Inductively Coupled Plasma Emission Spectrometer. A number of analytical protocols were developed for routine analyses. A comprehensive quality control program was implemented. More than 18,000 chemical analyses were performed

  14. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas.

  15. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Falls City, Texas: Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment of ground water contamination of the uranium mill tailings site near Falls City, Texas, evaluates potential impact to public health and the environment resulting from ground water contamination at the former Susquehanna Western, Inc. (SWI), uranium mill processing site. This document fulfills the following objectives: determine if the site presents immediate or potential future health risks, determine the need for interim institutional controls, serve as a key input to project planning and prioritization, and recommend future data collection efforts to more fully characterize risk. The Uranium Mill Tailings Remedial Action (UMTRA) Project has begun its evaluation of ground water contamination at the Falls City site. This risk assessment is one of the first documents specific to this site for the Ground Water Project. The first step is to evaluate ground water data collected from monitor wells at or near the site. Evaluation of these data show the main contaminants in the Dilworth ground water are cadmium, cobalt, fluoride, iron, nickel, sulfate, and uranium. The data also show high levels of arsenic and manganese occur naturally in some areas

  16. Cleanup protocols when encountering thorium-230 at U.S. DOE Uranium Mill Tailings Remedial Action (UMTRA) Project sites

    International Nuclear Information System (INIS)

    Miller, M.L.; Hylko, J.M.; Cornish, R.E.

    1995-01-01

    The passage of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, established the regulatory framework, under which the US EPA charged with developing standards for the cleanup and disposal of tailings at 24 designated inactive uranium processing sites located in 10 states. 40 CFR 192.12 requires that the concentration of Ra-226 in land averaged over any area of 100 square meters shall not exceed the background level by more than 5 pCi/g, averaged over the first 15 cm of soil below the surface, 15 pCi/g, averaged over 15-cm-thick layers of soils more than 15 cm below the surface. However, Th-230 is not specifically addressed by the EPA in 40 CFR 192.12, which naturally decays with a half-life of 77,000 years to form Ra-226. Consequently, the cleanup of the initial Ra-226 contamination according to the standards will not necessarily mitigate against the eventual ingrowth of residual Ra-226 with time, due to the radioactive decay of residual Th-230. Therefore, to direct the excavation of residual Th-230, four generic protocols are being used at Uranium Mill Tailings Remedial Action (UMTRA) Project sites, as follows: Determining the allowable remaining concentration of Th-230 in surface and subsurface soils; Encountering Th-230 contamination in the unsaturated subsurface soil; Encountering Th-230 contamination in the saturated zone; and Verification sampling. The four generic protocols, developed in conjunction with the supplemental standards provision, ensure protection of the general public by reducing exposures to levels that are As Low As Reasonably Achievable, while considering practical measures necessary to excavate Th-230 under conditions encountered at the UMTRA Project site

  17. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC)

  18. Recycling and disposal of FUSRAP materials from the Ashland 2 site at a licensed uranium mill

    International Nuclear Information System (INIS)

    Howard, B.; Conboy, D.; Rehmann, M.; Roberts, H.

    1999-01-01

    During World War II the Manhattan Engineering District (MED) used facilities near Buffalo, N.Y. to extract natural uranium from ores. Some of the byproduct material left from the ores (MED byproduct), containing low levels of uranium, thorium, and radium, was deposited on a disposal site known as Ashland 2, located in Tonawanda, NY. On behalf of the United States Army Corps of Engineers (USACE, or the Corps), ICF Kaiser Engineers (ICFKE) was tasked to provide the best value clean-up results that meet all of the criteria established in the Record of Decision for the site. International Uranium (USA) Corporation (IUC), the operator of the White Mesa Uranium Mill, a Nuclear Regulatory Commission (NRC)-licensed mill near Blanding, Utah, was selected to perform uranium extraction on the excavated materials, therefore giving the best value as it provided beneficial use of the material consistent with the Resource Conservation and Recovery Act (RCRA) intent to encourage recycling and recovery, while also providing the most cost-effective means of disposal. Challenges overcome to complete this project included (1) identifying the best-value location to accept the material; (2) meeting regulatory requirements with IUC obtaining an NRC license amendment to accept and process the material as an alternate feed; (3) excavating and preparing the material for shipment, then shipping the material to the Mill for uranium recovery; and (4) processing the material, followed by disposal of tailings from the process in the Mill's licensed uranium tailings facility. Excavation from Ashland 2 and processing of the Ashland 2 material at the White Mesa Mill resulted in a cleaner environment at Tonawanda, a cost avoidance of up to $16 million, beneficial recovery of source material, and environmentally protective disposal of byproduct material. (author)

  19. Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1993-09-01

    This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site

  20. Geotechnical engineering considerations in the NRC's review of uranium mill tailings remedial action plans

    International Nuclear Information System (INIS)

    Gillen, D.M.

    1985-01-01

    To reduce potential health hazards associated with inactive uranium mill tailings sites, the Department of Energy (DOE) is presently investigating and implementing remedial actions at 24 sites in the Uranium Mill Tailings Remedial Action Program (UMTRAP). All remedial actions must be selected and performed with the concurrence of the Nuclear Regulatory Commission (NRC). This paper provides a discussion of geotechnical engineering considerations during the NRC's preconcurrence review of proposed remedial action plans. In order for the NRC staff to perform an adequate geotechnical engineering review, DOE documents must contain a presentation of the properties and stability of all in-situ and engineered soil and rock which may affect the ability of the remedial action plans to meet EPA standards for long-term stability and control. Site investigations, laboratory testing, and remedial action designs must be adequate in scope and technique to provide sufficient data for the NRC staff to independently evaluate static and dynamic stability, settlement, radon attenuation through the soil cover, durability of rock for erosion protection, and other geotechnical engineering factors

  1. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determine what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.

  2. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium

  3. Uranium mills and mines environmental restoration in Spain

    International Nuclear Information System (INIS)

    Perez Estevez, C.; Lozano Martinez, F.

    2000-01-01

    ENRESA and ENUSA have dismantled and restored a uranium mill in Andujar (Andalucia), a uranium facility based on open pit mining and plant in La Haba (Extremadura) and 19 old uranium mines in Andalucia and Extremadura. The Andujar Uranium Mill was operated from 1959 to 1981 and has been restorated between 1991 and 1994. The site included the tailings pile and the processing plant. The Haba Uranium Site included the Plant (operating from 1976 to 1999), four open-pit mines (operating from 1966 to 1990), the heaps leaching and the tailings dam and has been restorated between 1992 and 1997. The 19 abandoned uranium mines were developed by underground mining with the exception of two sites, which were operated by open pit mining. Mining operations started around 1959 and were shutdown in 1981. There was a great diversity among the mines, in terms of site conditions. Whereas in some sites there was little trace of the mining works, in other sites large excavations, mining debris piles, abandoned shafs and galeries and remaining surface structures and equipment were encountered. (author)

  4. 77 FR 35431 - Final Alternative Soils Standards for the Uravan, CO, Uranium Mill

    Science.gov (United States)

    2012-06-13

    ..., Uranium Mill AGENCY: Nuclear Regulatory Commission. ACTION: Notice of Uranium milling alternative... amend their agreements to regulate uranium mill tailings (11e.(2) byproduct material). Six Agreement... transferring the Uravan uranium mill site to the U.S. Department of Energy. The NRC staff found no deficiencies...

  5. Engineering assessment of inactive uranium mill tailings, Monument Valley site, Monument Valley, Arizona. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-01-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the Monument Valley millsite in Arizona. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the tailings on the site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The sparse population and relatively low radiation levels yield minimal immediate environmental impact; hence, the two alternative actions presented are directed towards restricting access to the site (Options I and II), and returning the windblown tailings to the pile and stabilizing the pile with 2 ft of cover material (Option II). Both options include remedial action costs for offsite locations where tailings have been placed. Cost estimates for the two options are $585,000 and $1,165,000. Reprocessing the tailings for uranium is not economically feasible

  6. Engineering assessment of inactive uranium mill tailings, Naturita site, Naturita, Colorado. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at Naturita, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings, the performance of radiometric measurements to determine the extent of radium contamination, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the costing of alternative corrective actions. Radon gas release from the 704,000 tons of tailings at the Naturita site constitutes the most significant environmental impact although windblown tailings and external gamma radiation are also factors. Ranchers Exploration and Development Company has been licensed by the State of Colorado to reprocess the tailings at a location 3 mi from the present site where they will be stabilized for long-term storage. The remedial action options include remedial action for structures in Naturita and Nucla (Option I) at an estimated cost of $270,000 and remedial action for structures and open land adjacent to the tailings site (Option II) at an estimated cost of $950,000

  7. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Green River Site, Green River, Utah

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Green River site, Utah. The services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology and the evaluation and costing of alternative corrective actions. Radon gas release from the 123 thousand tons of tailings at the Green River site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The three alternative actions presented are dike stabilization, fencing, on- and off-site decontamination and maintenance; improvements in the stabilization cover and diking plus cleanup of the site and Browns Wash, and realignment of Browns Wash; and addition of stabilization cover to a total of 2 ft, realignment of Browns Wash and placement of additional riprap, on-site cleanup and drainage improvements. All options include remedial action at off-site structures. Cost estimates for the three options range from $700,000 to $926,000

  8. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    International Nuclear Information System (INIS)

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site's contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determine what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination

  9. Radiologic characterization of the Mexican Hat, Utah, uranium mill tailings remedial action site: Appendix D, Addenda D1--D7

    Energy Technology Data Exchange (ETDEWEB)

    Ludlam, J.R.

    1985-01-01

    This radiologic characterization of the inactive uranium millsite at Mexican Hat, Utah, was conducted by Bendix Field Engineering Corporation foe the US Department of Energy (DOE), Grand Junction Project Office, in response to and in accord with a Statement of Work prepared by the DOE Uranium Mill tailings Remedial Action Project (UMTRAP) Technical Assistance Contractor, Jacobs Engineering Group, Inc. the objective of this project was to determine the horizontal and vertical extent of contamination that exceeds the US Environmental Protection Agency (EPA) standards at the Mexican Hat site. The data presented in this report are required for characterization of the areas adjacent to the Mexican Hat tailings piles and for the subsequent design of cleanup activities. Some on-pile sampling was required to determine the depth of the 15-pCi/g Ra-226 interface in an area where wind and water erosion has taken place.

  10. Continued care of uranium mill sites: some economic considerations

    International Nuclear Information System (INIS)

    Harrington, W.; Sawyer, J.W. Jr.

    1978-01-01

    A critique of recently enacted legislation authorizing the New Mexico Environmental Improvement Agency to regulate uranium mills in the state is presented. Under this new legislation, the Agency is authorized to require payment of up to 10 cents per pound of yellowcake from each licensed mill in the state until a total of $1 million has been deposited by that mill. The continued care fund thus created will provide for maintenance in perpetuity of mill sites after being decommissioned. Arguments are presented, based on calculations for a typical 5,000 ton per day mill, that even the maximum amount is not likely to generate sufficient income to support an adequate maintenance program. The matter is further aggravated by the rate of inflation which will increase costs beyond the coverage provided by a fixed funding system. To correct this situation, it is proposed that (1) the fund should generate an income stream sufficient to meet all maintenance costs based on currently available information on costs, interest, and inflation rates, and (2) the terms of the continued care contribution should be readily alterable as new information becomes available. The latter condition should be coupled with removal of the upper statutory limit now established for the fund

  11. Engineering assessment of inactive uranium mill tailings, Belfield Site, Belfield, North Dakota

    International Nuclear Information System (INIS)

    1981-11-01

    Ford, Bacon and Davis Utah Inc. has evaluated the Belfield site in order to assess the problems resulting from the existence of radiactive ash at Belfield, South Dakota. This engineering assessment has included drilling of boreholes and radiometric measurements sufficient to determine areas and volumes of ash and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actons. Radon gas released from the 55,600 tons of ash and contaminated material at the Belfield site constitutes a significant environmental impact, although external gamma radiation also is a factor. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material, to removal of the ash and contaminated materials to remote disposal sites, and decontamination of the Belfield site. Cost estimates for the four options range from about $1,500,000 for stabilization in-place, to about $2,500,000 for disposal at a distance of about 17 mi from the Belfield site. Reprocessing the ash for uranium recovery is not feasible because of the extremely small amount of material available at the site and because of its low U 3 O 8 content

  12. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites Slick Rock, Colorado. Draft

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-06-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA) authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VP) associated with the sites. The US Environmental Protection Agency (EPA) promulgated standards for the UMTRCA that contained measures to control the contaminated materials and to protect the groundwater from further degradation. Remedial actions at the Slick Rock sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC).

  13. Preliminary evaluation of uranium mill tailings conditioning as an alternative remedial action technology

    International Nuclear Information System (INIS)

    Dreesen, D.R.; Cokal, E.J.; Thode, E.F.; Wangen, L.E.; Williams, J.M.

    1981-01-01

    Conditioning of uranium mill tailings is being investigated as an alternative remedial action for inactive tailings piles to be stabilized by the US Department of Energy. Tailings from high priority sites have been characterized for elemental composition, mineralogy, aqueous leachable contaminants, and radon emanation power to provide a baseline to determine the environmental hazard control produced by conditioning. Thermal stabilization of tailings at high temperatures and removal of contaminants by sulfuric acid leaching are being investigated for technical merit as well as economic and engineering feasibility

  14. Hydrology and geochemistry of the uranium mill tailings pile at Riverton, Wyoming. Part II. History matching

    International Nuclear Information System (INIS)

    Narasimhan, T.N.; White, A.F.; Tokunaga, T.

    1985-02-01

    In Part I of this series of two reports the observed fluid potential and geochemical characteristics in and around the inactive uranium mill tailings pile at Riverton, Wyoming were presented. The prupose of the present work is to attempt to simulate field observations using mathematical models. The results of the studies have not only helped identify the physicochemical mechanisms govering contaminant migration around the inactive mill tailings pile in Riverton, but also have indicated the feasibility of quantifying these mechanisms with the help of newly developed mathematical models. Much work needs to be done to validate and benchmark these models. The history-matching effort on hand involves the mathematical simulation of the observed fluid potentials within the tailings, and the observed distribution of various chemical species within and around the inactive uranium mill tailings. The simulation problem involves consideration of transient fluid flow and transient, reactive chemical transport in a variably saturated ground water system with time-dependent boundary conditions. 15 refs., 30 figs., 3 tabs

  15. Baseline risk assessment for groundwater contamination at the uranium mill tailings site near Monument Valley, Arizona. Draft

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This baseline risk assessment evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site near Monument Valley, Arizona. The tailings and other contaminated material at this site are being relocated and stabilized in a disposal cell at Mexican Hat, Utah, through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The tailings removal is planned for completion by spring 1994. After the tailings are removed, groundwater contamination at the site will continue to be evaluated. This risk assessment is the first document specific to this site for the Groundwater Project. It will be used to assist in determining what remedial action is needed for contaminated groundwater at the site.

  16. 76 FR 70170 - Proposed Alternative Soils Standards for the Uravan, Colorado Uranium Mill

    Science.gov (United States)

    2011-11-10

    ..., Colorado Uranium Mill AGENCY: Nuclear Regulatory Commission. ACTION: Uranium milling alternative standards... Agreements to regulate uranium mill tailings (11e.(2) byproduct material). Six Agreement States have this... in Colorado are acceptable. Discussion The Uravan site began operations in 1912 as a radium mill and...

  17. Uranium mill tailings and radon

    International Nuclear Information System (INIS)

    Hanchey, L.A.

    1981-01-01

    The major health hazard from uranium mill tailings is presumed to be respiratory cancer resulting from the inhalation of radon daughter products. A review of studies on inhalation of radon and its daughters indicates that the hazard from the tailings is extremely small. If the assumptions used in the studies are correct, one or two people per year in the US may develop cancer as a result of radon exhaled from all the Uranium Mill Tailings Remedial Action Program sites. The remedial action should reduce the hazard from the tailings by a factor of about 100

  18. Uranium mill tailings and radon

    Energy Technology Data Exchange (ETDEWEB)

    Hanchey, L A

    1981-04-01

    The major health hazard from uranium mill tailings is presumed to be respiratory cancer resulting from the inhalation of radon daughter products. A review of studies on inhalation of radon and its daughters indicates that the hazard from the tailings is extremely small. If the assumptions used in the studies are correct, one or two people per year in the United States may develop cancer as a result of radon exhaled from all the Uranium Mill Tailings Remedial Action program sites. The remedial action should reduce the hazard from the tailings by a factor of about 100.

  19. Uranium mill tailings and radon

    Energy Technology Data Exchange (ETDEWEB)

    Hanchey, L A

    1981-01-01

    The major health hazard from uranium mill tailings is presumed to be respiratory cancer resulting from the inhalation of radon daughter products. A review of studies on inhalation of radon and its daughters indicates that the hazard from the tailings is extremely small. If the assumptions used in the studies are correct, one or two people per year in the US may develop cancer as a result of radon exhaled from all the Uranium Mill Tailings Remedial Action Program sites. The remedial action should reduce the hazard from the tailings by a factor of about 100.

  20. Remedial action and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1993-07-01

    This report presents geologic considerations that are pertinent to the Remedial Action Plan for Slick Rock mill tailings. Topics covered include regional geology, site geology, geologic stability, and geologic suitability

  1. Quality assurance program plan for the radiological survey activities program: Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-08-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  2. Quality assurance program plan for the Radiological Survey Activities Program - Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Ramos, S.J.; Berven, B.A.; Little, C.A.

    1986-01-01

    The Radiological Survey Activities (RASA) program at Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude the site from UMTRAP based on whether the onsite residual radioactive material (if any) originated from the former mill sites, and radiation levels onsite are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the quality assurance program plan for the RASA program in conducting all activities related to the UMTRA project. All quality assurance provisions given by the DOE, DOE/UMTRA, and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the RASA/UMTRAP QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups

  3. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site.

  4. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1994-06-01

    This Baseline Risk Assessment of Ground Water Contamination at the Uranium Mill Tailings Site Near Grand Junction, Colorado evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site. This risk assessment follows an approach outlined by the EPA. the first step is to evaluate ground water data collected from monitor wells at the site. Evaluation of these data showed that the contaminants of potential concern in the ground water are arsenic, cadmium, cobalt, fluoride, iron, manganese, molybdenum, nickel, sulfate, uranium, vanadium, zinc, and radium-226. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if they drank from a well installed in the contaminated ground water at the former processing site

  5. Baseline risk assessment of groundwater contamination at the uranium mill tailings site near Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1993-09-01

    This report evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1986 by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This risk assessment is the first document specific to this site for the Groundwater Project. This risk assessment follows the approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the floodplain groundwater are arsenic, magnesium, manganese, nitrate, sodium, sulfate, and uranium. The complete list of contaminants associated with the terrace groundwater could not be determined due to the lack of the background groundwater quality data. However, uranium, nitrate, and sulfate are evaluated since these chemicals are clearly associated with uranium processing and are highly elevated compared to regional waters. It also could not be determined if the groundwater occurring in the terrace is a usable water resource, since it appears to have originated largely from past milling operations. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if a drinking well were installed in the contaminated groundwater or if there were exposure to surface expressions of contaminated water. Potential exposures to surface water include incidental contact with contaminated water or sediments by children playing on the floodplain and consumption of meat and milk from domestic animals grazed and watered on the floodplain

  6. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-04-01

    This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan River floodplain below the site. For these reasons, this risk assessment evaluates potential exposure to contaminated surface water and seeps as well as potential future use of contaminated ground water

  7. Analysis of expert opinion on uranium mill tailings remedial action project (UMTRAP) alternatives: a decision-support-system pilot study

    International Nuclear Information System (INIS)

    Thode, E.F.

    1983-01-01

    The Uranium Mill Tailings Remedial Action Project requires a specific remedial action individually chosen for each site. A panel of professionals was asked to rate objectives for remedial action and to rank alternatives for meeting the objectives. Responses were statistically analyzed. The panel's preference was earth cover in place at the Salt Lake City, Utah, and Shiprock, New Mexico, sites. Asphalt cover was next at Salt Lake City. This decision support system is appropriate for use with other inactive and active tailings sites

  8. Uranium mill decommissioning - an update on the Edgemont experience

    International Nuclear Information System (INIS)

    Donovan, Th.K.; Chart, E.J.; Cummings, G.W.; Tappan, J.T.

    1983-01-01

    This paper describes the Edgemont Uranium Mill Decommissioning Project. An estimated 5.4 million tons of contaminated material including approximately 2.5 million tons of uranium mill tailings will be moved to a disposal site approved by the Nuclear Regulatory Commission (NRC). The decommissioning activities will be carried out by Silver King Mines, Inc., under a management services contract to the Tennessee Valley Authority. The primary advantages of the disposal site chosen are the short distance from the existing site and the approximately 650 feet of relatively dense impermeable shales above the shallowest known aquifer. Three large ore stockpiles containing about 100,000 pounds of uranium have been moved from the mill site to a proposed mine site. The decommissioning project will be carried out by using the existing labor force to the maximum extent possible thus preventing a population influx and the accompanying socioeconomic input to the city of Edgemont, SD

  9. Radiological survey of the inactive uranium-mill tailings at the Spook site, Converse County, Wyoming

    International Nuclear Information System (INIS)

    Haywood, F.F.; Christian, D.J.; Chou, K.D.; Ellis, B.S.; Lorenzo, D.; Shinpaugh, W.H.

    1980-05-01

    Results of a radiological survey performed at the Spook site in Converse County, Wyoming, in June 1976, are presented. The mill at this site was located a short distance from the open-pit mine where the ore was obtained and where part of the tailings was dumped into the mine. Several piles of overburden or low-grade ore in the vicinity were included in the measurements of above-ground gamma exposure rate. The average exposure rate over these piles varied from 14 μR/hr, the average background exposure rate for the area, to 140 μR/hr. The average exposure rate for the tailings and former mill area was 220 μR/hr. Movement of tailings particles down dry washes was evident. The calculated concentration of 226 Ra in ten holes as a function of depth is presented graphically

  10. Uranium mining and milling sites in Argentina: environmental radiological monitoring (1980-1994)

    International Nuclear Information System (INIS)

    Bomben, A.M.; Gomez, J.C.; Oliveira, A.A.

    1995-01-01

    Environmental radiological monitoring in the vicinity of uranium mining and milling plants in Argentina is performed on a routine basis, in order to assess the possibility of significant environmental contamination due to uranium mill wastes and mill tailings of plants still operating or those where the exploitation have concluded. Dissolved natural uranium and 226 Ra concentrations in surface waters are measured in samples taken from rivers near the mills, according to a special monitoring plan set up for each facility. In addition, 222 Rn emanation rates from ore tailings are measured at times. In this paper the environmental radiological monitoring program results obtained for the 1980-1994 period are shown. From the data analyses it can be concluded that there are not significant differences for the concentrations of the radionuclides of interest, between the surface water samples taken from river location above and below the plants discharge points. Besides, no significant exposure results for the population living in the surrounding areas due to the uranium mining and milling plants operation or their wastes. (author). 2 refs., 5 figs

  11. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    Bachrach, A.; Hoopes, J.; Morycz, D.; Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P.; Rice, G.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated [vicinity] properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed

  12. Comparative evaluation of liner materials for inactive uranium-mill-tailings piles

    International Nuclear Information System (INIS)

    Buelt, J.L.; Barnes, S.M.

    1981-01-01

    Under the funding of the Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Program, Pacific Northwest Laboratory (PNL) has completed the initial accelerated testing phase of eight candidate liner materials. The tests were designed to comparatively evaluate the long term effectiveness of liner materials as a radionuclide and hazardous chemical leachate barrier. The eight materials tested were selected from a technical review of published literature and industrial specialists. Conditions were then identified that would accelerate the aging processes expected in a uranium tailings environment for 1000 years. High calcium leachates were forced through thin layers of clay liners to accelerate the ion exchange rate of sodium and calcium. Asphalt and synthetic materials were accelerated by exposure to elevate temperatures, high concentrations of oxygen, and increased strengths of aqueous oxidizing agents. By comparing the changes of permeability with time of exposure, the most acceptable materials were then identified. These materials are a catalytically airblown asphalt membrane and natural soil amended with sodium bentonite. Both materials showed an increased resistance to leachate penetration throughout the exposure period with final permeabilities less than 10 -7 cm/s. In addition, the asphalt membrane and sodium bentonite are among the least expensive materials to install at a disposal site. Therefore based on their economic and technical merits, these two materials are being evaluated further in field tests at Grand Junction, Colorado

  13. Quality Assurance Program Plan for the radiological survey activities program --- Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    Knott, R.R.; Little, C.A.

    1991-08-01

    The Pollutant Assessments Group (PAG) at the Grand Junction Office (GJO), Colorado, of Oak Ridge National Laboratory (ORNL) is responsible for surveying designated sites in the vicinity of 24 inactive mill sites involved in the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). The purpose of these surveys is to provide a recommendation to DOE whether to include or exclude these sites from UMTRAP based on whether the on-site residual radioactive material (if any) originated from the former mill sites, and radiation levels on-site are in excess of appropriate Environmental Protection Agency (EPA) criteria. This report describes the Quality Assurance Plan (QAP) for the PAG in conducting all activities related to UMTRAP. All quality assurance provisions given by the DOE, DOE/UMTRA and ORNL organizations are integrated into this plan. Specifically, this report identifies the policies and procedures followed in accomplishing the PAG/UMTRA QA program, identifies those organizational units involved in the implementation of these procedures, and outlines the respective responsibilities of those groups. 11 refs., 6 figs., 3 tabs

  14. Engineering assessment of inactive uranium mill tailings, Slick Rock sites, Slick Rock, Colorado. A summary of the Phase II, Title I

    International Nuclear Information System (INIS)

    1977-10-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive uranium mill tailings at the two millsites in Slick Rock, Colorado. The Phase II, Title I services include the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting radiation exposures of individuals residing nearby, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. The Union Carbide site has 350,000 tons of tailings and the North Continent site now owned by Union Carbide has 37,000 tons of tailings. Both tailings piles have been stabilized in accordance with regulations of the State of Colorado. Radon gas release from the tailings on the sites constitute the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The sparse population and relatively low radiation levels yield minimal immediate environmental impact. Hence the three alternative actions presented are directed towards restricting access to the sites (Option I), and returning the windblown tailings to the piles and stabilizing the piles with cover material (Option II), and consolidating the two piles on the UC site and stabilizing with 2 ft of cover (Option III). Fencing around the tailings piles is included in all options. Options II and III provide 2 ft of cover material on the tailings. Costs of the options range from $370,000 to $1,100,000. Reprocessing the tailings for uranium is not economically feasible

  15. Biota of uranium mill tailings near the Black Hills

    Science.gov (United States)

    Mark A. Rumble

    1982-01-01

    Reclamation" often implies the enhancement of the land as wildlife habitat or for other productive uses. However, there are situations where revegetation to stabilize erosion is the only desired goal. Uranium mining and mill sites may fall into this later category. Data pertaining to plant and animal components on revegetated uranium mill tailings was collected....

  16. Baseline risk assessment of groundwater contamination at the uranium mill tailings site near Shiprock, New Mexico. Draft

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This report evaluates potential impact to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in a disposal cell on the site in 1986 by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This risk assessment is the first document specific to this site for the Groundwater Project. This risk assessment follows the approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the floodplain groundwater are arsenic, magnesium, manganese, nitrate, sodium, sulfate, and uranium. The complete list of contaminants associated with the terrace groundwater could not be determined due to the lack of the background groundwater quality data. However, uranium, nitrate, and sulfate are evaluated since these chemicals are clearly associated with uranium processing and are highly elevated compared to regional waters. It also could not be determined if the groundwater occurring in the terrace is a usable water resource, since it appears to have originated largely from past milling operations. The next step in the risk assessment is to estimate how much of these contaminants people would be exposed to if a drinking well were installed in the contaminated groundwater or if there were exposure to surface expressions of contaminated water. Potential exposures to surface water include incidental contact with contaminated water or sediments by children playing on the floodplain and consumption of meat and milk from domestic animals grazed and watered on the floodplain.

  17. Baseline risk assessment of groundwater contamination at the Uranium Mill Tailings Site near Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This report evaluates potential impacts to public health or the environment resulting from groundwater contamination at the former uranium mill processing site. The tailings and other contaminated material at this site are being placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating groundwater contamination. This is the second risk assessment of groundwater contamination at this site. The first risk assessment was performed primarily to evaluate existing domestic wells to determine the potential for immediate human health and environmental impacts. This risk assessment evaluates the most contaminated groundwater that flows beneath the processing site towards the Gunnison River. The monitor wells that have consistently shown the highest concentration of most contaminants are used in this risk assessment. This risk assessment will be used in conjunction with additional activities and documents to assist in determining what remedial action is needed for contaminated groundwater at the site after the tailings are relocated. This risk assessment follows an approach outlined by the US Environmental Protection Agency (EPA). The first step is to evaluate groundwater data collected from monitor wells at the site. Evaluation of these data showed that the main contaminants in the groundwater are cadmium, cobalt, iron, manganese, sulfate, uranium, and some of the products of radioactive decay of uranium.

  18. Summary of the engineering assessment of inactive uranium mill tailings: Lakeview Site, Lakeview, Oregon

    International Nuclear Information System (INIS)

    1981-10-01

    Radon gas released from the 130,000 tons of tailings at the Lakeview site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation also are factors. The three alternative actions include millsite decontamination with the addition of 3 m of stabilization cover material (Option I) and removal of the tailings to remote disposal sites and decontamination of the tailings site (Options II and III). Cost estimates range from $6,000,000 for stabilization in-place, to $7,500,000 for disposal at a distance of about 10 miles. Three alternatives for reprocessing the Lakeview tailings were examined. Results show that uranium recovery is not economical

  19. A thick homogeneous vegetated cover design proves cost - and schedule-effective for the reclamation of uranium mills sites near Spokane, Washington

    Energy Technology Data Exchange (ETDEWEB)

    Blacklaw, J.; Robertson, G.; Stoffel, D.; Ahmad, J.; Fordham, E. [Washington State Dept. of Health, Olympia, WA (United States)] [and others

    1997-08-01

    The Washington State Department of Health (WDOH) has licensed two medium sized uranium mills with tailings impoundments covering 28 and 40 hectares (70 and 100 acres), respectively, The uranium mill licensees have submitted closure and reclamation plans to the state, and site-specific conditions have determined the closure design features, Conventional uranium mill cover designs usually incorporate an overall cap of one to three meters, which includes a low-permeability clay barrier layer. A technical evaluation of several uranium mill facilities that used this design was published in the fall of 1994 and reported that unexpected vegetation root damage had occurred in the low-permeability clay (or bentonite amended) barrier layers. The technical report suggested that the low-permeability design feature at some sites could be compromised within a very short time and the regulatory goal of 1,000 years performance might not be achieved. In October 1994, WDOH sponsored a technical forum meeting to consider design alternatives to address these reliability concerns. Representatives from the federal government, nuclear industry, licensees, engineering firms, and state regulatory agencies attended the workshop. Risk factors considered in the evaluation of the uranium mill reclamation plans include: (1) radon gas emanation through the cover (the air pathway), and (2) migration of hazardous and/or radioactive constituents (the groundwater pathway). Additional design considerations include site structural stability, longevity of 1,000 years, and no active (ongoing) maintenance. 9 refs.

  20. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Phillips/United Nuclear Site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium mill tailings at the Phillips/United Nuclear site at Ambrosia Lake, New Mexico. Services included the preparation of topographic maps, the performance of core drillings sufficient to determine areas and volumes of tailings and radiometric measurements to determine radium-contaminated materials, the evaluation of resulting radiation exposures of individuals and nearby populations, the investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 2.6 million tons of tailings at the Phillips/United Nuclear site constitutes the most significant environmental impact, although windblown tailings and external gamma radiation are also factors. The estimated radiological health effects to the general population are considered to be minimal. The two alternative actions presented are: dike stabilization, fencing, and maintenance; and adding 2 ft of stabilization cover material. Both options include remedial action at off-site structures and on-site decontamination around the tailings pile. Cost estimates for the two options are $920,000 and $2,230,000, respectively

  1. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1994-05-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC section 7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd 3 ). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM)

  2. Environmental assessment of remedial action at the inactive uraniferous lignite ashing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978 authorized the US Department of Energy (DOE) to perform remedial actions at Belfield and Bowman inactive lignite ashing sites in southwestern North Dakota to reduce the potential public health impacts from the residual radioactivity remaining at the sites. The US Environmental Protection Agency (EPA) promulgated standards (40 CFR 192) that contain measures to control the residual radioactive materials and other contaminated materials, and proposed standards to protect the groundwater from further degradation. Remedial action at the Belfield and Bowman sites must be performed in accordance with these standards and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The Belfield and Bowman designated sites were used by Union Carbide and Kerr-McGee, respectively, to process uraniferous lignite in the 1960s. Uranium-rich ash from rotary kiln processing of the lignite was loaded into rail cars and transported to uranium mills in Rifle, Colorado, and Ambrosia Lake, New Mexico, respectively. As a result of the ashing process, there is a total of 158,400 cubic yards (yd 3 ) [121,100 cubic meters (m 3 )] of radioactive ash-contaminated soils at the two sites. Windblown ash-contaminated soil covers an additional 21 acres (8.5 ha) around the site, which includes grazing land, wetlands, and a wooded habitat

  3. Finding of No Significant Impact, proposed remediation of the Maybell Uranium Mill Processing Site, Maybell, Colorado

    International Nuclear Information System (INIS)

    1995-01-01

    The U.S. Department of Energy (DOE) has prepared an environmental assessment (EA) (DOE/EA-0347) on the proposed surface remediation of the Maybell uranium mill processing site in Moffat County, Colorado. The mill site contains radioactively contaminated materials from processing uranium ore that would be stabilized in place at the existing tailings pile location. Based on the analysis in the EA, DOE has determined that the proposed action does not constitute a major federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, Public Law 91-190 (42 U.S.C. section 4321 et seq.), as amended. Therefore, preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI)

  4. Remedial action plan and site design for stabilization of the inactive uranium mill tailings sites at Slick Rock, Colorado: Remedial Action Selection Report. Preliminary final

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This proposed remedial action plan incorporates the results of detailed investigation of geologic, geomorphic, and seismic conditions at the proposed disposal site. The proposed remedial action will consist of relocating the uranium mill tailings, contaminated vicinity property materials, demolition debris, and windblown/waterborne materials to a permanent repository at the proposed Burro Canyon disposal cell. The proposed disposal site will be geomorphically stable. Seismic design parameters were developed for the geotechnical analyses of the proposed cell. Cell stability was analyzed to ensure long-term performance of the disposal cell in meeting design standards, including slope stability, settlement, and liquefaction potential. The proposed cell cover and erosion protection features were also analyzed and designed to protect the RRM (residual radioactive materials) against surface water and wind erosion. The location of the proposed cell precludes the need for permanent drainage or interceptor ditches. Rock to be used on the cell top-, side-, and toeslopes was sized to withstand probable maximum precipitation events.

  5. Control and prevention of seepage from uranium mill waste disposal facilities

    International Nuclear Information System (INIS)

    Williams, R.E.

    1978-01-01

    This paper constitutes an analysis of the technologies which are available for the prevention of movement of waste waters out of uranium mill waste disposal facilities via sub-surface routes. Hydrogeologic criteria for potential uranium mill waste disposal sites and mathematical modeling of contaminant migration in ground water are presented. Methods for prevention of seepage from uranium mill waste disposal facilities are investigated: liners, clay seals, synthetic polymeric membranes (PVC, polyethylene, chlorinated polyethylene, hypalon, butyl rubber, neoprene, elasticized polyolefin)

  6. Grouting of uranium mill tailings piles

    International Nuclear Information System (INIS)

    Boegly, W.J. Jr.; Tamura, T.; Williams, J.D.

    1984-03-01

    A program of remedial action was initiated for a number of inactive uranium mill tailings piles. These piles result from mining and processing of uranium ores to meet the nation's defense and nuclear power needs and represent a potential hazard to health and the environment. Possible remedial actions include the application of covers to reduce radon emissions and airborne transport of the tailings, liners to prevent groundwater contamination by leachates from the piles, physical or chemical stabilization of the tailings, or moving the piles to remote locations. Conventional installation of liners would require excavation of the piles to emplace the liner; however, utilization of grouting techniques, such as those used in civil engineering to stabilize soils, might be a potential method of producing a liner without excavation. Laboratory studies on groutability of uranium mill tailings were conducted using samples from three abandoned piles and employing a number of particulate and chemical grouts. These studies indicate that it is possible to alter the permeability of the tailings from ambient values of 10 -3 cm/s to values approaching 10 -7 cm/s using silicate grouts and to 10 -8 cm/s using acrylamide and acrylate grouts. An evaluation of grouting techniques, equipment required, and costs associated with grouting were also conducted and are presented. 10 references, 1 table

  7. Costs and benefits of alternatives for mill-tailings management: a perspective

    International Nuclear Information System (INIS)

    Chee, P.C.; Yuan, Y.C.; Roberts, C.J.

    1983-01-01

    Past milling of uranium and thorium ore in the United States has produced tailings that are stored at numerous sites around the country. Some of these storage sites are located near towns and cities, and the local populations are exposed to radiation and radioactive materials migrating off the sites. The federal government has initiated remedial action programs (for example the Uranium Mill Tailings Remedial Action Program and the Formerly Utilized Sites Remedial Action Program) to clean up land and buildings that have become contaminated with radioactive material and thus eliminate or reduce population exposure to radiation. The degree of long-term benefit from any reduction of the population dose will be different for each remedial action, as will the cost. To gain a perspective on the cost-benefit ratios of various alternatives (remedial actions), estimates are made of the potential radiation doses to affected populations near two inactive sites and of the costs associated with (1) onsite stabilization of radioactive tailings, and (2) transportation of tailings to remote locations for stabilization. The calculations presented in this paper were based on actual conditions at an inactive uranium mill tailings site (the Vitro site in Salt Lake City, Utah) and at a former thorium-processing facility (Kerr-McGee site in West Chicago, Illinois)

  8. The progress in the researches for uranium mill tailings cleaning treatment and no-waste uranium ore milling processes

    International Nuclear Information System (INIS)

    Wang Jintang

    1990-01-01

    The production of uranium mill tailings and their risk assessment are described. The moethods of uranium mill tailings disposal and management are criticized and the necessity of the researches for uranium mill tailings cleaning treatment and no-wasle uranium ore milling process are demonstrated. The progress for these researches in China and other countries with uranium production is reviewed, and the corresponding conclusions are reported

  9. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site`s tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site.

  10. Summary of the engineering assessment of inactive uranium-mill tailings, Bowman Site, Bowman, North Dakota

    International Nuclear Information System (INIS)

    1981-11-01

    Ford, Bacon and Davis Utah Inc. has performed an engineering assessment of the problems resulting from the existence of radioactive residues from the burning of uranium-bearing lignite at Bowman, North Dakota. This engineering assessment has included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of ash residues and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 97,000 tons of ash and contaminated materials at the Bowman site constitutes a significant environmental impact, although windblown ash and external gamma radiation also are factors. The four alternative actions presented in this engineering assessment range from millsite decontamination with the addition of 3 m of stabilization cover material (Option I), to removal of the contaminated materials to remote disposal sites and decontamination of the ashing site (Options II through IV). Cost estimates for the four options range from about $1,740,000 for stabilization in-place, to about $3,060,000 for disposal at a distance of about 4 mi. Reprocessing the ash for uranium recovery is not feasible because of the extremely small amount of material available at the site and because of its low U 3 O 8 content

  11. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), authorizes the Department of Energy (DOE) to undertake remedial actions at 24 DOE designated processing sites. The term ''processing site,'' by statutory definition, means the inactive uranium mill or processing site and any other real property or improvement which is in the vicinity of the mill or processing site and is determined to be contaminated with residual radioactive materials derived from the mill or processing site. For purposes of this document, the inactive mill or processing site is referred to as the ''processing site'' and the other real property or improvement in the vicinity of such site is referred to as a 'vicinity property.'' The purpose of the remedial actions is to stabilize and control the uranium mill tailings and other residual radioactive materials in a safe and environmentally sound manner. Remedial actions undertaken by DOE are to be accomplished: With the full participation of the affected states and Indian tribes, in accordance with standards issued by the Environmental Protection Agency (EPA), and with the concurrence of the Nuclear Regulatory Commission (NRC). This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. 5 refs., 1 tab

  12. Long-Term Stewardship at a Former Uranium Mill Tailings Site in Riverton, Wyoming WM2017-17090

    Energy Technology Data Exchange (ETDEWEB)

    Dam, William [USDOE Office of Legacy Management, Washington, DC (United States); Gil, Dr. April [USDOE Office of Legacy Management, Washington, DC (United States); Johnson, Raymond H. [Navarro Research and Engineering, Oak Ridge, TN (United States); Campbell, Sam [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2017-03-01

    The US Department of Energy Office of Legacy Management (LM) is responsible for maintaining protective public health and environmental conditions at former uranium mill tailings sites nationwide via long-term stewardship. One of these sites, a former uranium mill near Riverton, Wyoming, is within the boundary of the Wind River Indian Reservation and operated from 1958 to 1963. Tailings and contaminated material associated with mill operations were removed and transported to an offsite disposal cell in 1989. The remedial action was completed under Title I of the Uranium Mill Tailings Radiation Control Act of 1978. Milling operations, which included an unlined tailings impoundment and an unlined evaporation pond, contaminated the shallow groundwater, resulting in a downgradient groundwater plume that discharges to the Little Wind River. A natural flushing compliance strategy was implemented in 1998. This strategy allows contaminants of concern to naturally flush from the groundwater, provided that contaminants flush below US Environmental Protection Agency maximum concentration limits within 100 years. As part of the compliance strategy, LM has implemented a groundwater monitoring program along with institutional controls that include the installation of an alternate water supply, continued sampling of private wells, and restrictions on well drilling and gravel pit construction. LM works closely with local stakeholders and community members to ensure that these institutional controls are in place and maintained. The Riverton site provides an interesting case study where contaminant remobilization due to river flooding prompted a reevaluation of the conceptual site model to verify if the current compliance strategy would remain protective of human health and the environment. Concentrations of groundwater contaminants, which include sulfate, molybdenum, and uranium, were transiently elevated following flooding of the Little Wind River in 2010 and 2016. These flood

  13. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Shiprock, New Mexico. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This baseline risk assessment at the former uranium mill tailings site near Shiprock, New Mexico, evaluates the potential impact to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an on-site disposal cell in 1986 through the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project. There are no domestic or drinking water wells in the contaminated ground water of the two distinct ground water units: the contaminated ground water in the San Juan River floodplain alluvium below the site and the contaminated ground water in the terrace alluvium area where the disposal cell is located. Because no one is drinking the affected ground water, there are currently no health or environmental risks directly associated with the contaminated ground water. However, there is a potential for humans, domestic animals, and wildlife to the exposed to surface expressions of ground water in the seeps and pools in the area of the San Juan River floodplain below the site. For these reasons, this risk assessment evaluates potential exposure to contaminated surface water and seeps as well as potential future use of contaminated ground water.

  14. A plant taxonomic survey of the Uranium City region, Lake Athabasca north shore, emphasizing the naturally colonizing plants on uranium mine and mill wastes and other human-disturbed sites

    International Nuclear Information System (INIS)

    Harms, V.L.

    1982-07-01

    A goal of this study was to acquire more complete baseline data on the existing flora of the Uranium City region, both in natural and human-disturbed sites. Emphasis was given to determining which plant species were naturally revegetating various abandoned uranium mine and mill waste disposal areas, other human-disturbed sites, and ecologically analogous sites. Another goal was to document the occurrence and distribution in the study region of rare and possibly endangered species. A further objective was to suggest regionally-occurring species with potential value for revegetating uranium mine and mill waste sites. Field investigations were carried out in the Uranium City region during August, 1981. During this time 1412 plant collections were made; a total of 366 plant species - trees, shrubs, forbs, graminoids, lichens, and bryophytes were recorded. The report includes an annotated checklist of plant species of the Uranium City region and a reference index of plant taxa indicating species that have high revegetation potential

  15. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    International Nuclear Information System (INIS)

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC section 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE's Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use

  16. Environmental assessment of remedial action at the slick rock Uranium Mill Tailings sites Slick Rock, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section} 7901 et seq.), hereafter referred to as the UMTRCA, authorized the U.S. Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miguel County. The purpose of the cleanup is to reduce the potential health effects associated with the radioactive materials remaining on the sites and on vicinity properties (VPs) associated with the sites. Contaminated materials cover an estimated 55 acres of the Union Carbide (UC) processing site and 12 ac of the North Continent (NC) processing site. The total estimated volume of contaminated materials is approximately 61 8,300 cubic yards. In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designated site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi (8 km) northeast of the sites on land administered by the Bureau of Land Management (BLM). Remediation would be performed by the DOE`s Uranium Mill Tailings Remedial Action (UMTRA) Project. All solid contaminated materials would be buried under 5 feet (ft) of rock and soil materials. The proposed disposal site area is currently used by ranchers for cattle grazing over a 7-month period. The closest residence to the proposed disposal site is 2 air mi. An estimated 44 ac of land would be permanently transferred from the BLM to the DOE and restricted from future use.

  17. Uranium-mill appraisal program

    International Nuclear Information System (INIS)

    Everett, R.J.; Cain, C.L.

    1982-08-01

    The results of special team appraisals at NRC-licensed uranium mills in the period May to November 1981 are reported. Since the Three Mile Island accident, NRC management has instituted a program of special team appraisals of radiation protection programs at certain NRC-licensed facilities. These appraisals were designed to identify weaknesses and strengths in NRC-licensed programs, including those areas not covered by explicit regulatory requirements. The regulatory requirements related to occupational radiation protection and environmental monitoring at uranium mills have been extensively upgraded in the past few years. In addition, there was some NRC staff concern with respect to the effectiveness of NRC licensing and inspection programs. In response to this concern and to changes in mill requirements, the NRC staff recommended that team appraisals be conducted at mills to determine the adequacy of mill programs, the effectiveness of the new requirements, and mill management implementation of programs and requirements. This report describes the appraisal scope and methodology as well as summary findings and conclusions. Significant weaknesses identified during the mill appraisals are discussed as well as recommendations for improvements in uranium mill programs and mill licensing and inspection

  18. Baseline risk assessment of ground water contamination at the Monument Valley Uranium Mill Tailings Site, Cane Valley, Arizona. Revision 1

    International Nuclear Information System (INIS)

    1994-08-01

    This baseline risk assessment evaluates potential impact to public health or the environment from ground water contamination at the former uranium mill processing site in Cane Valley near Monument Valley, Arizona. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project has relocated and stabilized this site's tailings and other contaminated material in a disposal cell at Mexican Hat, Utah. The second phase of the UMTRA Project is to evaluate ground water contamination. This risk assessment is the first document specific to this site for the Ground Water Project that evaluates potential health and environmental risks. It will help determine the approach required to address contaminated ground water at the site

  19. A guide to ventilation requirements for uranium mines and mills. Regulatory guide G-221

    International Nuclear Information System (INIS)

    2003-06-01

    The purpose of G-221 is to help persons address the requirements for the submission of ventilation-related information when applying for a Canadian Nuclear Safety Commission (CNSC) licence to site and construct, operate or decommission a uranium mine or mill. This guide is also intended to help applicants for a uranium mine or mill licence understand their operational and maintenance obligations with respect to ventilation systems, and to help CNSC staff evaluate the adequacy of applications for uranium mine and mill licences. This guide is relevant to any application for a CNSC licence to prepare a site for and construct, operate or decommission a uranium mine or mill. In addition to summarizing the ventilation-related obligations or uranium mine and mill licensee, the guide describes and discusses the ventilation-related information that licence applicants should typically submit to meet regulatory requirements. The guide pertains to any ventilation of uranium mines and mills for the purpose of assuring the radiation safety of workers and on-site personnel. This ventilation may be associated with any underground or surface area or premise that is licensable by the CNSC as part of a uranium mine or mill. These areas and premises typically include mine workings, mill buildings, and other areas or premises involving or potentially affected by radiation or radioactive materials. Some examples of the latter include offices, effluent treatment plants, cafeterias, lunch rooms and personnel change-rooms. (author)

  20. Restoration activities in uranium mining and milling facilities in Spain

    International Nuclear Information System (INIS)

    Garcia Quiros, J.M.

    1997-01-01

    From the end of the 80's up to now, several tasks have been carried out in Spain on restoration in the field of uranium mining and milling, significant among them being Andujar Uranium Mill (FUA) closure and La Haba closure. Also, a study has been carried out on restoration of inoperative and abandoned uranium mine sites. At present, detailed plans are being worked out for the project on the closure of the Elefante plant. All activities have been developed in the common framework of national standards and regulations which are generally in compliance with the standards, regulations and recommendations of international organizations. This paper describes briefly the standards and the criteria applied to the restoration tasks at various sites of the uranium mining and milling facilities in Spain. The restoration activities have different characteristics La Haba facility is an isolated and conventional facility to produce uranium concentrate; in the case of old and abandoned uranium mines the intervention criteria is more relevant than the activities to be carried out; the closure (the first phase of licensing) and restoration activities of Elefante plant have to be developed taking into account that it is sited within the area of Quercus plant which is currently in operation. (author)

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site at Grand Junction, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This risk assessment evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site.

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site at Grand Junction, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-09-01

    This risk assessment evaluates potential impacts to public health or the environment resulting from ground water contamination at the former uranium mill processing site. The tailings and other contaminated material at this site were placed in an off-site disposal cell by the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The remedial activities at the site were conducted from 1989 to 1993. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment evaluates the most contaminated ground water that flows beneath the processing site toward the Colorado River. The monitor wells that have consistently shown the highest concentrations of most contaminants are used to assess risk. This risk assessment will be used in conjunction with additional activities and documents to determine what remedial action may be needed for contaminated ground water at the site

  3. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    International Nuclear Information System (INIS)

    2013-01-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  4. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    2013-11-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

  5. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah

    International Nuclear Information System (INIS)

    Matthews, M.L.; Alkema, K.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement

  6. Environmental assessment of ground-water compliance activities at the Uranium Mill Tailings Site, Spook, Wyoming

    International Nuclear Information System (INIS)

    1997-02-01

    This report assesses the environmental impacts of the Uranium Mill Tailings Site at Spook, Wyoming on ground water. DOE previously characterized the site and monitoring data were collected during the surface remediation. The ground water compliance strategy is to perform no further remediation at the site since the ground water in the aquifer is neither a current nor potential source of drinking water. Under the no-action alternative, certain regulatory requirements would not be met

  7. 77 FR 14837 - Bioassay at Uranium Mills

    Science.gov (United States)

    2012-03-13

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0057] Bioassay at Uranium Mills AGENCY: Nuclear Regulatory..., ``Bioassay at Uranium Mills.'' This guide describes a bioassay program acceptable to the NRC staff for uranium mills and applicable portions of uranium conversion facilities where the possibility of exposure...

  8. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    Energy Technology Data Exchange (ETDEWEB)

    Bachrach, A.; Hoopes, J.; Morycz, D. (Jacobs Engineering Group, Inc., Pasadena, CA (USA)); Bone, M.; Cox, S.; Jones, D.; Lechel, D.; Meyer, C.; Nelson, M.; Peel, R.; Portillo, R.; Rogers, L.; Taber, B.; Zelle, P. (Weston (Roy F.), Inc., Washington, DC (USA)); Rice, G. (Sergent, Hauskins and Beckwith (USA))

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.

  9. Suitability of vegetation for erosion control on uranium mill tailings: a regional analysis

    International Nuclear Information System (INIS)

    Beedlow, P.A.; McShane, M.C.

    1983-11-01

    Inactive uranium mill tailings (UMTRAP sites) in the West were grouped into three major climatic regions to evaluate the adequacy of vegetation for long-term stabilization: the Colorado Plateau, the West Slope of the Rocky Mountains, and the Northern Great Plains. Four general vegetation types were found at western sites: grasslands, shrub-steppe, and saltshrub and woodland. Soil-loss rates, calculated using the Universal Soil Loss Equation, were variable within regions and vegetation types, but trends were apparent. Calculations indicated that vegetation or vegetation plus a layer of surface rock provided adequate stabilization against long-term average soil loss for slopes less than 10% at the UMTRAP sites evaluated. However, detailed analyses of erosion due to severe storm events, gully formation and channel cutting is necessary for designing protective covers at each site. 11 references, 3 figures, 3 tables

  10. Environmental assessment of remedial action at the Tuba City uranium mill tailings site, Tuba City, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-11-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The site covers 105 acres and contains 25 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR Part 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at a more remote location. The no action alternative is also assessed in this document.

  11. Environmental assessment of remedial action at the Tuba City uranium mill tailings site, Tuba City, Arizona

    International Nuclear Information System (INIS)

    1986-11-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Tuba City uranium mill tailings site located approximately six miles east of Tuba City, Arizona. The site covers 105 acres and contains 25 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR Part 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at a more remote location. The no action alternative is also assessed in this document

  12. Programmatic Environmental Impact Statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1993-09-01

    Public concern regarding the potential human health and environmental effects from uranium mill tailings led Congress to pass the Uranium Mill Tailings Radiation Control Act (UMTRCA) (Public Law 95-604) in 1978. In the UMTRCA, Congress acknowledged the potentially harmful health effects associated with uranium mill tailings at 24 abandoned uranium mill processing sites needing remedial action. Uranium processing activities at most of the 24 mill processing sites resulted in the formation of contaminated ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of hazardous constituents such as uranium and nitrate. The purpose of the Ground Water Project is to protect human health and the environment by meeting EPA-proposed standards in areas where ground water has been contaminated with constituents from UMTRA Project sites. A major first step in the UMTRA Ground Water Project is the preparation of this Programmatic Environmental Impact Statement (PEIS). This document analyzes potential impacts of the alternatives, including the proposed action. These alternatives are programmatic in that they are plans for conducting the UMTRA Ground Water Project. The alternatives do not address site-specific ground water compliance. This PEIS is a planning document that will provide a framework for conducting the Ground Water Project; assess the potential programmatic and environmental impacts of conducting the UMTRA Ground Water Project; provide a method for determining the site-specific ground water compliance strategies; and provide data and information that can be used to prepare site-specific environmental impacts analyses documents more efficiently

  13. Site-specific analysis of radiological and physical parameters for cobbly soils at the Gunnison, Colorado, processing site

    International Nuclear Information System (INIS)

    1994-01-01

    The remedial action at the Gunnison, Colorado, processing site is being performed under the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. Under UMTRCA, the US Environmental Protection Agency (EPA) is charged with the responsibility of developing appropriate and applicable standards for the cleanup of radiologically contaminated land and buildings at 24 designated sites, including the Gunnison, Colorado, inactive processing site. Section 108 of Public Law 95-604 states that the US Department of Energy (DOE) shall ''select and perform remedial actions at the designated processing sites and disposal sites in accordance with the general standards'' prescribed by the EPA. Regulations governing the required remedial action at inactive uranium processing sites were promulgated by the EPA in 1983 and are contained in 40 CFR Part 192 (1993), Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings. This document describes the radiological and physical parameters for the remedial action of the soil

  14. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    Energy Technology Data Exchange (ETDEWEB)

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document.

  15. Environmental Assessment of remedial action at the Ambrosia Lake uranium mill tailings site, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1987-06-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Ambrosia Lake uranium mill tailings site located near Ambrosia Lake, New Mexico. The designated site covers 196 acres and contains 111 acres of tailings and some of the original mill structures. The Uranium Mill Tailings Radiation Control Act (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for th remedial action (40 CFR Part 192). Remedial action must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated materials into a recontoured pile. A radon barrier would be constructed over the pile and various erosion protection measures would be taken to assure the long-term stability of the pile. Another alternative which would involve moving the tailings to a new location is also assessed in this document. This alternative would generally involve greater short-term impacts and costs but would result in stabilization of the tailings at an undeveloped location. The no action alternative is also assessed in this document

  16. The suitability of vegetation for erosion control on uranium mill tailings: A regional analysis

    International Nuclear Information System (INIS)

    Beedlow, P.A.; McShane, M.C.

    1984-01-01

    Inactive uranium mill tailings (UMTRAP sites) in the West were grouped into three major climatic regions to evaluate the suitability of vegetation for long-term stabilization: the Colorado Plateau, the West Slope of the Rocky Mountains, and the Northern Great Plains. Four general vegetation types were found at western sites: grassland, shrub, salt shrub and woodland. Soil-loss rates, calculated using the Universal Soil Loss Equation, were variable within regions and vegetation types, but trends were apparent. Calculations indicated that vegetation or vegetation plus a layer of surface rock provided adequate stabilization against long-term average soil loss on slopes of less than 10%. However, at each site, detailed analyses of erosion caused by severe storm events, gully formation and channel cutting is necessary for designing protective covers

  17. Uranium mill tailings management

    International Nuclear Information System (INIS)

    1982-01-01

    Facilities for the disposal of uranium mill tailings will invariably be subjected to geomorphological and climatological influences in the long-term. Proceedings of a workshop discuss how the principles of geomorphology can be applied to the siting, design, construction, decommissioning and rehabilitation of disposal facilities in order to provide for long-term containment and stability of tailings. The characteristics of tailings and their behaviour after disposal influence the potential impacts which might occur in the long-term. Proceedings of another workshop examine the technologies for uranium ore processing and tailings conditioning with a view to identifying improvements that could be made in such characteristics

  18. Environmental activities in uranium mining and milling. A Joint NEA/IAEA report

    International Nuclear Information System (INIS)

    1999-01-01

    This report on 'Environmental Activities in Uranium Mining and Milling' presents an overview of environmental activities related to uranium production. The profile of activities and concerns are based on survey responses from 29 countries and a review of relevant activities of the International Atomic Energy Agency and the OECD Nuclear Energy Agency. It also provides an overview of the reported interests of specialists working in the field, including environmental impact assessment, emissions to air and water, work environment, radiation safety, waste handling and disposal, mine and mill decommissioning and site restoration, and the regulation of these activities. The report reflects the increasing awareness in all countries of the need for environmental protection. For several years large programmes have been underway in several countries to clean up wastes from closed mines and mills. Many of these sites, particularly the older ones, were brought into production, operated and closed when little was known about environmental effects. At the time, little concern was given to the resulting environmental impacts. Currently, planning for and conducting uranium mine closure and mill decommissioning, together with site clean-up and restoration, are of almost universal concern. Mine closure and mill decommissioning activities have been or are being conducted in most of the countries with a history of uranium production. Information about several mine closures and mill decommissioning projects is included in this report

  19. Environmental assessment of remedial action at the Slick Rock uranium mill tailings sites, Slick Rock, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (42 USC {section}7901 et seq.), hereafter referred to as the UMTRCA, authorized the US Department of Energy (DOE) to clean up two uranium mill tailings processing sites near Slick Rock, Colorado, in San Miquel County. Contaminated materials cover an estimated 63 acres of the Union Carbide (UC) processing site and 15 ac of the North Continent (NC) processing site. The sites are within 1 mile of each other and are adjacent to the Dolores River. The sites contain concrete foundations of mill buildings, tailings piles, and areas contaminated by windblown and waterborne radioactive tailings materials. The total estimated volume of contaminated materials is approximately 621,300 cubic yards (yd{sup 3}). In addition to the contamination in the two processing site areas, four VPs were found to contain contamination. As a result of the tailings being exposed to the environment, contamination associated with the UC and NC sites has leached into shallow ground water. Surface water has not been affected. The closest residence is approximately 0.3 air mi from either site. The proposed action is to remediate the UC and NC sites by removing all contaminated materials within the designing site boundaries or otherwise associated with the sites, and relocating them to, and stabilizing them at, a location approximately 5 road mi northeast of the sites on land administered by the Bureau of Land Management (BLM).

  20. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are

  1. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    International Nuclear Information System (INIS)

    1996-01-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings ' ... may pose a potential and significant radiation health hazard to the public, and that every reasonable effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings.' Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  3. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado

    International Nuclear Information System (INIS)

    1995-08-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase I), and the Ground Water Project (phase II). For the UMTRA Project site located near Naturita, Colorado (the Naturita site), phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation's Upper Burbank Repository at Uravan, Colorado, about 13 road miles (mi) (21 kilometers [km]) to the northwest. No uranium mill tailings are involved because the tailings were removed from the Naturita site and placed at Coke Oven, Colorado, during 1977 to 1979. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health or the environment; and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has received contaminated ground water. Therefore, a risk assessment is conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment

  4. Measurements of uranium in soils and small mammals

    International Nuclear Information System (INIS)

    Miera, F.R. Jr.

    1980-12-01

    The objective of this study was to evaluate the bioavailability of uranium to a single species of small mammal, Peromyscus maniculatus rufinus (Merriam), white-footed deer mouse, from two different source terms: a Los Alamos National Laboratory dynamic weapons testing site in north central New Mexico, where an estimated 70,000 kg of uranium have been expended over a 31-y period; and an inactive uranium mill tailings pile located in west central New Mexico near Grants, which received wastes over a 5-y period from the milling of 2.7 x 10 9 kg of uranium ore

  5. Measurements of uranium in soils and small mammals

    Energy Technology Data Exchange (ETDEWEB)

    Miera, F.R. Jr.

    1980-12-01

    The objective of this study was to evaluate the bioavailability of uranium to a single species of small mammal, Peromyscus maniculatus rufinus (Merriam), white-footed deer mouse, from two different source terms: a Los Alamos National Laboratory dynamic weapons testing site in north central New Mexico, where an estimated 70,000 kg of uranium have been expended over a 31-y period; and an inactive uranium mill tailings pile located in west central New Mexico near Grants, which received wastes over a 5-y period from the milling of 2.7 x 10/sup 9/ kg of uranium ore.

  6. Airborne effluent control at uranium mills

    International Nuclear Information System (INIS)

    Sears, M.B.

    1976-01-01

    The Oak Ridge National Laboratory has made an engineering cost--environmental benefit study of radioactive waste treatment systems for decreasing the amount of radioactive materials released from uranium ore processing mills. This paper summarizes the results of the study which pertain to the control and/or abatement of airborne radioactive materials from the mill processes. The tailings area is not included. Present practices in the uranium milling industry, with particular emphasis on effluent control and waste management, have been surveyed. A questionnaire was distributed to each active mill in the United States. Replies were received from about 75 percent of the mill operators. Visits were made to six operating uranium mills that were selected because they represented the different processes in use today and the newest, most modern in mill designs. Discussions were held with members of the Region IV Office of NRC and the Grand Junction Office of ERDA. Nuclear Science Abstracts, as well as other sources, were searched for literature pertinent to uranium mill processes, effluent control, and waste management

  7. Uranium mining and milling

    International Nuclear Information System (INIS)

    Floeter, W.

    1976-01-01

    In this report uranium mining and milling are reviewed. The fuel cycle, different types of uranium geological deposits, blending of ores, open cast and underground mining, the mining cost and radiation protection in mines are treated in the first part of this report. In the second part, the milling of uranium ores is treated, including process technology, acid and alkaline leaching, process design for physical and chemical treatment of the ores, and the cost. Each chapter is clarified by added figures, diagrams, tables, and flowsheets. (HK) [de

  8. Evaluation of chemical stabilizers and windscreens for wind erosion control of uranium mill tailings

    International Nuclear Information System (INIS)

    Elmore, M.R.; Hartley, J.N.

    1984-08-01

    Potential wind erosion of uranium mill tailings is a concern for the surface disposal of tailings at uranium mills. Wind-blown tailings may subsequently be redeposited on areas outside the impoundment. Pacific Northwest Laboratory (PNL) is investigating techniques for fugitive dust control at uranium mill tailings piles. Laboratory tests, including wind tunnel studies, were conducted to evaluate the relative effectiveness of 43 chemical stabilizers. Seventeen of the more promising stabilizers were applied to test plots on a uranium tailings pile at the American Nuclear Corporation-Gas Hills Project mill site in central Wyoming. The durabilities of these materials under actual site conditions were evaluated over time. In addition, field testing of commercially available windscreens was conducted. Test panels were constructed of eight different materials at the Wyoming test site to compare their durability. A second test site was established near PNL to evaluate the effectiveness of windscreens at reducing wind velocity, and thereby reduce the potential for wind erosion of mill tailings. Results of the laboratory land field tests of the chemical stabilizers and windscreens are presented, along with costs versus effectiveness of these techniques for control of wind erosion at mill tailings piles. 12 references, 4 figures, 6 tables

  9. Uptake of uranium by aquatic plants growing in fresh water ecosystem around uranium mill tailings pond at Jaduguda, India

    Energy Technology Data Exchange (ETDEWEB)

    Jha, V.N., E-mail: jhavn1971@gmail.com; Tripathi, R.M., E-mail: tripathirm@yahoo.com; Sethy, N.K., E-mail: sethybarc@rediffmail.com; Sahoo, S.K., E-mail: sksbarc@gmail.com

    2016-01-01

    Concentration of uranium was determined in aquatic plants and substrate (sediment or water) of fresh water ecosystem on and around uranium mill tailings pond at Jaduguda, India. Aquatic plant/substrate concentration ratios (CRs) of uranium were estimated for different sites on and around the uranium mill tailings disposal area. These sites include upstream and downstream side of surface water sources carrying the treated tailings effluent, a small pond inside tailings disposal area and residual water of this area. Three types of plant groups were investigated namely algae (filamentous and non-filamentous), other free floating & water submerged and sediment rooted plants. Wide variability in concentration ratio was observed for different groups of plants studied. The filamentous algae uranium concentration was significantly correlated with that of water (r = 0.86, p < 0.003). For sediment rooted plants significant correlation was found between uranium concentration in plant and the substrate (r = 0.88, p < 0.001). Both for other free floating species and sediment rooted plants, uranium concentration was significantly correlated with Mn, Fe, and Ni concentration of plants (p < 0.01). Filamentous algae, Jussiaea and Pistia owing to their high bioproductivity, biomass, uranium accumulation and concentration ratio can be useful for prospecting phytoremediation of stream carrying treated or untreated uranium mill tailings effluent. - Highlights: • Uranium mill tailings pond. • Jaduguda, India. • Fresh water plants. • Uranium uptake. • Relationship of uranium with stable elements.

  10. Training manual for uranium mill workers on health protection from uranium

    International Nuclear Information System (INIS)

    McElroy, N.; Brodsky, A.

    1986-01-01

    This report provides information for uranium mill workers to help them understand the radiation safety aspects of working with uranium as it is processed from ore to yellowcake at the mills. The report is designed to supplement the radiation safety training provided by uranium mills to their workers. It is written in an easily readable style so that new employees with no previous experience working with uranium or radiation can obtain a basic understanding of the nature of radiation and the particular safety requirements of working with uranium. The report should be helpful to mill operators by providing training material to support their radiation safety training programs

  11. Finding and evaluating potential radiological problems in the vicinity of uranium milling sites

    International Nuclear Information System (INIS)

    Goldsmith, W.A.; Yates, W.G.

    1982-01-01

    Tailings at inactive milling sites usually have a low frequency of human occupancy but continuously generate 222 Rn into the atmosphere. Measurements of airborne 222 Rn and 222 Rn flux are made on the sites to define the tailings source term. Concurrently with these measurements, an ambient 222 Rn monitoring network is established off-site and a meteolrololgical station is established at or near the mill site. Radioactivity can migrate to areas outside of site boundaries by wind and water erosion, groundwater transport, spillage of incoming purposes. In order to identify and assess off-site radioactivity on properties in the vicinity of milling sites, a combination of aerial and ground-level radiological monitoring techniques are used. The ground mobile gamma-ray scan is conducted using a vehicle equipped with sensitive gamma-ray detectors. The detectors are shielded so that gamma radiation input is viewed through only one side of the vehicle. This system is capable of precisely locating properties which have anomalously high gamma radiation levels caused by the presence of tailings. Subsequently, these properties are identified as candidate vicinity properties and are scheduled for radiological surveys subject to the property owner's consent. The comprehensive radiological surveys conducted at these vicinity properties determine the amount, type, and location of tailings materials. Structures on a vicinity property are carefully surveyed to determine the presence or absence of construction-related uses of tailings. If structural uses of tailings are found, air samples are analyzed for 222 Rn progeny, short-term continuous 222 Rn monitoring is instituted, and 222 Rn flux rate from tailings are estimated. If warranted, long-term 222 Rn and progeny measurements are made

  12. Remediation of uranium mill tailings wastes in Australia: a critical review

    International Nuclear Information System (INIS)

    Mudd, G.M.

    2000-01-01

    Australia has been an active participant in the global uranium mining industry since its inception in the 1940s. By the late 1950s five major mining and milling projects were operating, several small mines supplied custom ores. All of these projects were closed by the early 1960s, except for Rum Jungle which continued under government subsidy. Most sites have had lasting Environmental impacts. The advances in nuclear power in the 1960s saw increasing demand for uranium and Australia again explored with remarkable success in the Northern Territory, South Australia and Western Australia. After several government inquiries in the 1970s, Ranger, Nabarlek and Olympic Dam were operating by the mid 1980s. The principal risks from uranium mill tailings wastes arise from their radioactive nature and often their chemical toxicities. A critical review of the rehabilitation of abandoned uranium mines and mill tailings as a comparison for current projects is presented. It is concluded that the management of uranium mill tailings wastes is a complex task, requiring a sound multi-disciplinary approach. The problems include groundwater contamination, erosion, radon emanation and gamma radiation. evidence to data from the remediation of old and modern sites does not demonstrate effective long-term closure and safety

  13. Elemental characterization of Tummalapalle uranium mill tailing

    International Nuclear Information System (INIS)

    Patra, A.C.; Sahoo, S.K.; Thakur, V.K.; Dubey, J.S.; Jha, S.K.; Tripathi, R.M.; Sharma, D.B.

    2018-01-01

    Elements are present in environmental matrices at varying concentrations. Their levels may increase due to anthropogenic activities like transportation, industrial activities, agriculture, urbanization and human activities. Trace elements can be classified as potentially toxic (eg. cadmium, arsenic, mercury, lead, nickel), probably essential (eg. cobalt, vanadium) and essential (eg. iron, zinc, copper, selenium, manganese). Due to the expansion of the Indian Nuclear Power Programme, new uranium mining sites are coming up. Mining and milling produce large quantities of low active mill tailings contained in engineered Tailings Ponds. The tailings are amenable for interaction with the geochemical forces and can act as potential sources of contamination. Thus it is necessary to ascertain the concentrations of elements that are present therein. In this paper we aim to characterize the uranium tailings generated from Tummalapalle uranium mining facility in Kadappa district, Andhra Pradesh, India

  14. Uranium mill tailings remedial action technology

    International Nuclear Information System (INIS)

    Hartley, J.N.; Gee, G.W.

    1984-01-01

    The uranium milling process involves the hydrometallurgical extraction of uranium from ores and the resultant generation of large quantities of waste referred to as tailings. Uranium mill tailings have been identified as requiring remediation because they contain residual radioactive material that is not removed in the milling process. Potential radiation exposure can result from direct contact with the tailings, from radon gas emitted by the tailings, and from radioactive contamination of groundwater. As a result, the technology developed under the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) and the US Nuclear Regulatory Commission (NRC) Uranium Recovery Program have focused on radon control, groundwater contamination and the long-term protection of the containment system. This paper briefly summarizes the UMTRAP and NRC remedial action technology development. 33 references, 9 figures, 5 tables

  15. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground water at the Bowman site.

  16. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota

    International Nuclear Information System (INIS)

    1994-11-01

    This baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Bowman, North Dakota, evaluates the potential impacts to public health or the environment from contaminated ground water at this site. This contamination is a result of the uraniferous lignite ashing process, when coal containing uranium was burned to produce uranium. Potential risk is quantified only for constituents introduced by the processing activities and not for the constituents naturally occurring in background ground water in the site vicinity. Background ground water, separate from any site-related contamination, imposes a percentage of the overall risk from ground water ingestion in the Bowman site vicinity. The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project is developing plans to address soil and ground water contamination at the site. The UMTRA Surface Project involves the determination of the extent of soil contamination and design of an engineered disposal cell for long-term storage of contaminated materials. The UMTRA Ground Water Project evaluates ground water contamination. Based on results from future site monitoring activities as defined in the site observational work plan and results from this risk assessment, the DOE will propose an approach for managing contaminated ground water at the Bowman site

  17. Integrated assessmet of the impacts associated with uranium mining and milling

    Energy Technology Data Exchange (ETDEWEB)

    Parzyck, D.C.; Baes, C.F. III; Berry, L.G.

    1979-07-01

    The occupational health and safety impacts are assessed for domestic underground mining, open pit mining, and milling. Public health impacts are calculated for a population of 53,000 located within 88 km (55 miles) of a typical southwestern uranium mill. The collective annual dose would be 6.5 man-lung rem/year, 89% of which is from /sup 222/Rn emitted from mill tailings. The dose to the United States population is estimated to be 6 x 10/sup 4/ man-lung rem from combined mining and milling operations. This may be comparedd with 5.7 x 10/sup 5/ man-lung rem from domestic use of natural gas and 4.4 x 10/sup 7/ man-lung rem from building interiors. Unavoidable adverse environmental impacts appear to be severe in a 250 ha area surrounding a mill site but negligible in the entire potentially impacted area (500,000 ha). The contemporary uranium resource and supply industry and its institutional settings are described in relation to the socio-economic impacts likely to emerge from high levels of uranium mining and milling. Radon and radon daughter monitoring techniques associated with uranium mining and milling are discussed.

  18. Integrated assessmet of the impacts associated with uranium mining and milling

    International Nuclear Information System (INIS)

    Parzyck, D.C.; Baes, C.F. III; Berry, L.G.

    1979-07-01

    The occupational health and safety impacts are assessed for domestic underground mining, open pit mining, and milling. Public health impacts are calculated for a population of 53,000 located within 88 km (55 miles) of a typical southwestern uranium mill. The collective annual dose would be 6.5 man-lung rem/year, 89% of which is from 222 Rn emitted from mill tailings. The dose to the United States population is estimated to be 6 x 10 4 man-lung rem from combined mining and milling operations. This may be comparedd with 5.7 x 10 5 man-lung rem from domestic use of natural gas and 4.4 x 10 7 man-lung rem from building interiors. Unavoidable adverse environmental impacts appear to be severe in a 250 ha area surrounding a mill site but negligible in the entire potentially impacted area (500,000 ha). The contemporary uranium resource and supply industry and its institutional settings are described in relation to the socio-economic impacts likely to emerge from high levels of uranium mining and milling. Radon and radon daughter monitoring techniques associated with uranium mining and milling are discussed

  19. Determination of aerosol size distributions at uranium mill tailings remedial action project sites

    International Nuclear Information System (INIS)

    Newton, G.J.; Reif, R.H.; Hoover, M.D.

    1994-01-01

    The U.S. Department of Energy (DOE) has an ongoing program, the Uranium Mill Tailings Remedial Action (UMTRA) Project, to stabilize piles of uranium mill tailings in order to reduce the potential radiological hazards to the public. Protection of workers and the general public against airborne radioactivity during remedial action is a top priority at the UMTRA Project. The primary occupational radionuclides of concern are 230 Th, 226 Ra, 210 Pb, 210 Po, and the short-lived decay products of 222 Rn with 230 Th causing the majority of the committed effective dose equivalent (CEDE) from inhaling uranium mill tailings. Prior to this study, a default particle size of 1.0 μm activity median aerodynamic diameter (AMAD) was assumed for airborne radioactive tailings dust. Because of recent changes in DOE requirements, all DOE operations are now required to use the CEDE methodology, instead of the annual effective dose equivalent (AEDE) methodology, to evaluate internal radiation exposures. Under the transition from AEDE to CEDE, with a 1.0 μm AMAD particle size, lower bioassay action levels would be required for the UMTRA Project. This translates into an expanded internal dosimetry program where significantly more bioassay monitoring would be required at the UMTRA Project sites. However, for situations where the particle size distribution is known to differ significantly from 1.0 μm AMAD, the DOE allows for corrections to be made to both the estimated dose to workers and the derived air concentration (DAC) values. For particle sizes larger than 1.0 μm AMAD, the calculated CEDE from inhaling tailings would be relatively lower

  20. Current practices and options for confinement of uranium mill tailings

    International Nuclear Information System (INIS)

    1981-01-01

    At the United Nations Conference on the Human Environment, which took place in Stockholm from 4 to 6 June 1972, national governments were asked to explore, with the International Atomic Energy Agency and other appropriate international organizations, international co-operation on radioactive waste matters including those of mining and tailings disposal. Since that time the IAEA has been active in the field of uranium and thorium mill tailings management. As part of this activity, the present report describes current practices and options for confinement of uranium mill tailings. It is addressed to technical and administrative personnel who are involved in planning and implementing national and industrial programmes on the management of such tailings. In 1974 and 1975 the IAEA convened meetings of experts to review matters of interest and importance in the management of uranium and thorium mine and mill tailings. These activities led to the publication in 1976 of Management of Wastes from the Mining and Milling of Uranium and Thorium Ores, a Code of Practice and Guide to the Code, IAEA Safety Series No. 44. As a continuation of this activity, the IAEA is here dealing more specifically with the design and siting considerations for the management of uranium mill tailings

  1. Correlation between gamma radiation levels and soil radium concentrations at the Edgemont uranium mill site

    International Nuclear Information System (INIS)

    Wallace, R.G.; Reed, R.P.; Polehn, J.L.; Wilson, G.T.

    1985-01-01

    The Tennessee Valley Authority's uranium mill in Edgemont, South Dakota, is being decommissioned. Approximately 4 million tons of contaminated tailings, building equipment, and contaminated soil and debris on the mill site will be removed to the disposal site located approximately 3 kilometers to the southeast. To minimize recontamination of cleaned areas, tailings removal will progress from the northwest corner to the southeast corner of the mill site. As specific areas are cleaned, surveys will be conducted to determine if the concentrations of radium-226 in soil are within the limits outlined in 40 CFR, Part 192. Conformance with the criteria will be demonstrated by a gamma survey of the area employing the differential, or delta-measurement, technique. This technique involves fitting the detector with a base and a receptacle for a removable high-density filter. By making measurements with and without the filter in place, a gamma radiation level proportional to the radium-226 concentration in soil can be determined. This paper describes the results obtained in the development of the correlation between the gamma survey measurements and the soil radium concentrations

  2. Correlation between gamma radiation levels and soil radium concentrations at the Edgemont uranium mill site

    International Nuclear Information System (INIS)

    Wallace, R.G.; Reed, R.P.; Polehn, J.L.; Wilson, G.T.

    1986-01-01

    The Tennessee Valley Authority's uranium mill in Edgemont, South Dakota is being decommissioned. Approximately 4 million tons of contaminated tailings, building equipment, and contaminated soil and debris on the mill site will be removed to the disposal site located approximately 3 kilometers to the southeast. To minimize recontamination of cleaned areas, tailings removal will progress from the northwest corner to the southeast corner of the mill site. As specific areas are cleaned, surveys will be conducted to determine if the concentrations of radium-226 in soil are within the limits outlined in 40 CFR, Part 192. Conformance with the criteria will be demonstrated by a gamma survey of the area employing the differential, or delta-measurement, technique. This technique involves fitting the detector with a base and a receptacle for a removable high-density filter. By making measurements with and without the filter in place, a gamma radiation level proportional to the radium-226 concentration in soil can be determined. This paper describes the results obtained in the development of the correlation between the gamma survey measurements and the soil radium concentrations

  3. Molecular analysis of the bacterial diversity in uranium mill tailings

    International Nuclear Information System (INIS)

    Geissler, A.

    2003-04-01

    A culture-independent molecular approach has been applied to investigate the bacterial diversity in three uranium contaminated sites. The three analysed soil samples have been collected from the uranium waste pile Haberland near Johanngeorgenstadt (Germany), from the uranium mill tailings in Gunnison, Colorado (USA) and from the uranium mill tailings in Shiprock, New Mexico (USA). The 16S rDNA fragments which has been isolated through direct lysis of the whole-DNA were amplified by the use of the universal primers 16S 43f and 16S 1404r and cloned. With restriction fragment length polymorphismus (RFLP) were the clones screened and one representative of all RFLP types that occurred more than once in the clone library was sequenced and analysed. In spite of the contamination a considerable diversity and significant differences in the composition of the natural bacterial communities in these three sites have been found. In the sample collected from the waste pile Haberland near Johanngeorgenstadt α-Proteobacteria and representatives of the Holophaga/Acidobacterium were numerically predominant. The distribution of bacteria in the sample collected from uranium mill tailings Gunnison was very similar to those found in the Haberland waste pile, but there were found besides α-Proteobacteria and representatives of Holophaga/Acidobacterium a lot of γ-Proteobacteria. The structure of the bacterial community in the sample collected from the uranium mill tailings Shiprock was significantly different. Only some representatives of the Holophaga/Acidobacterium and α-Proteobacteria were represented. Large populations of Bacilli, γ-Proteobacteria and green non sulfur bacteria were dominant in this sample. (orig.)

  4. Uptake of uranium by aquatic plants growing in fresh water ecosystem around uranium mill tailings pond at Jaduguda, India.

    Science.gov (United States)

    Jha, V N; Tripathi, R M; Sethy, N K; Sahoo, S K

    2016-01-01

    Concentration of uranium was determined in aquatic plants and substrate (sediment or water) of fresh water ecosystem on and around uranium mill tailings pond at Jaduguda, India. Aquatic plant/substrate concentration ratios (CRs) of uranium were estimated for different sites on and around the uranium mill tailings disposal area. These sites include upstream and downstream side of surface water sources carrying the treated tailings effluent, a small pond inside tailings disposal area and residual water of this area. Three types of plant groups were investigated namely algae (filamentous and non-filamentous), other free floating & water submerged and sediment rooted plants. Wide variability in concentration ratio was observed for different groups of plants studied. The filamentous algae uranium concentration was significantly correlated with that of water (r=0.86, puranium concentration in plant and the substrate (r=0.88, puranium concentration was significantly correlated with Mn, Fe, and Ni concentration of plants (puranium accumulation and concentration ratio can be useful for prospecting phytoremediation of stream carrying treated or untreated uranium mill tailings effluent. Copyright © 2015 Elsevier B.V. All rights reserved.

  5. Uranium resource technology, Seminar 3, 1980

    International Nuclear Information System (INIS)

    Morse, J.G.

    1980-01-01

    This conference proceedings contains 20 papers and 1 panel discussion on uranium mining and ore treatment, taking into account the environmental issues surrounding uranium supply. Topics discussed include: the US uranium resource base, the technology and economics of uranium recovery from phosphate resources, trends in preleash materials handling of sandstone uranium ores, groundwater restoration after in-situ uranium leaching, mitigation of the environmental impacts of open pit and underground uranium mining, remedial actions at inactive uranium mill tailings sites, environmental laws governing in-situ solution mining of uranium, and the economics of in-situ solution mining. 16 papers are indexed separately

  6. Summary of the engineering assessment of inactive uranium mill tailings: Belfield Site, Belfield, North Dakota

    International Nuclear Information System (INIS)

    1981-11-01

    Ford, Bacon and Davis Utah Inc. has evaluated the Belfield site in order to assess the problems resulting from the existence of radioactive ash at Belfield, South Dakota. This engineering assessment has included drilling of boreholes and radiometric measurements sufficient to determine areas and volumes of ash and radiation exposures of individuals and nearby populations, the investigations of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas released from the 55,600 tons of ash and contaminated material at the Belfield site constitutes a significant environmental impact, although external gamma radiation also is a factor. The four alternative actions presented in this engineering assessment range from millsite and off-site decontamination with the addition of 3 m of stabilization cover material, to removal of the ash and contaminated materials to remote disposal sites, and decontamination of the Belfield site. Cost estimates for the four options range from about $1,500,000 for stabilization in-place, to about $2,500,000 for disposal at a distance of about 17 mi from the Belfield site. Reprocessing the ash for uranium recovery is not feasible because of the extremely small amount of material available at the site and because of its low U 3 O 8 content

  7. Diversity and characterization of sulfate-reducing bacteria in groundwater at a uranium mill tailings site

    International Nuclear Information System (INIS)

    Chang, Yun-Juan; Peacock, A D.; Long, Philip E.; Stephen, John R.; McKinley, James P.; Mcnaughton, Sarah J.; Hussain, A K M A.; Saxton, A M.; White, D C.

    2000-01-01

    Microbially mediated reduction and immobilization of U(VI) to U(TV) plays a role in both natural attenuation and accelerated bioremediation of uranium contaminated sites. To realize bioremediation potential and accurately predict natural attenuation, it is important to first understand the microbial diversity of such sites. In this paper, the distribution of sulfate-reducing bacteria (SRB) in contaminated groundwater associated with a uranium mill tailings disposal site at Shiprock, N.Mex,, was investigated. Two culture-independent analyses were employed: sequencing of clone libraries of PCR-amplified dissimilatory sulfite reductase (DSR) gene fragments and phospholipid fatty acid (PLFA) biomarker analysis. A remarkable diversity among the DSR sequences was revealed, including sequences from F-Proteobacteria, gram-positive organisms, and the Nitrospira division. PLFA analysis detected at least,52 different mid-chain-branched saturate PLFA and included a high proportion of 10me16:0, Desulfotomaculum and Desulfotomaculum-like sequences were the most dominant DSR genes detected. Those belonging to SRB within F-Proteobacteria were mainly recovered from low-uranium (less than or equal to 302 ppb) samples. One Desulfotomaculum like sequence cluster overwhelmingly dominated high-U (> 1,500 ppb) sites. Logistic regression showed a significant influence of uranium concentration over the dominance of this cluster of sequences (P= 0.0001), This strong association indicates that Desulfotomaculum has remarkable tolerance and adaptation to high levels of uranium and suggests the organism's possible involvement in natural attenuation of uranium. The in situ activity level of Desulfotomaculum in uranium-contaminated environments and its comparison to the activities of other SRB and other functional groups should be an important area for future research

  8. Environmental design of a uranium mill

    International Nuclear Information System (INIS)

    Quan, C.H.; Ring, R.J.; McNaughton, S.J.

    2002-01-01

    In the frame work of the Cleaner Technology Project for Uranium Mining and Milling, Australian Nuclear and Technology Organization (ANSTO), Environment Division of ANSTO has carried out a programme of research which seeks to identify, investigate and develop cleaner technologies that have the potential to minimize the environmental impact of uranium mining and milling. This paper describes three design options of a new uranium mill that can meet environmental, technical and economical objectives. The feasibility of such an approach was examined in the laboratory and in a pilot plant study. (author)

  9. The source of groundwater and solutes to Many Devils Wash at a former uranium mill site in Shiprock, New Mexico

    Science.gov (United States)

    Robertson, Andrew J.; Ranalli, Anthony J.; Austin, Stephen A.; Lawlis, Bryan R.

    2016-04-21

    The Shiprock Disposal Site is the location of the former Navajo Mill (Mill), a uranium ore-processing facility, located on a terrace overlooking the San Juan River in the town of Shiprock, New Mexico. Following the closure of the Mill, all tailings and associated materials were encapsulated in a disposal cell built on top of the former Mill and tailings piles. The milling operations, conducted at the site from 1954 to 1968, created radioactive tailings and process-related wastes that are now found in the groundwater. Elevated concentrations of constituents of concern—ammonium, manganese, nitrate, selenium, strontium, sulfate, and uranium—have also been measured in groundwater seeps in the nearby Many Devils Wash arroyo, leading to the inference that these constituents originated from the Mill. These constituents have also been reported in groundwater that is associated with Mancos Shale, the bedrock that underlies the site. The objective of this report is to increase understanding of the source of water and solutes to the groundwater beneath Many Devils Wash and to establish the background concentrations for groundwater that is in contact with the Mancos Shale at the site. This report presents evidence on three working hypotheses: (1) the water and solutes in Many Devils Wash originated from the operations at the former Mill, (2) groundwater in deep aquifers is upwelling under artesian pressure to recharge the shallow groundwater beneath Many Devils Wash, and (3) the groundwater beneath Many Devils Wash originates as precipitation that infiltrates into the shallow aquifer system and discharges to Many Devils Wash in a series of springs on the east side of the wash. The solute concentrations in the shallow groundwater of Many Devils Wash would result from the interaction of the water and the Mancos Shale if the source of water was upwelling from deep aquifers or precipitation.In order to compare the groundwater from various wells to groundwater that has been

  10. Evaluation of liners for a uranium-mill tailings disposal site: a status report

    International Nuclear Information System (INIS)

    Buelt, J.L.; Hale, V.Q.; Barnes, S.M.; Silviera, D.J.

    1981-05-01

    The United States Department of Energy is conducting a program designed to reclaim or stabilize inactive uranium-mill tailings sites. This report presents the status of the Liner Evaluation Program. The purpose of the study was to identify eight prospective lining materials or composites for laboratory testing. The evaluation was performed by 1) reviewing proposed regulatory requirements to define the material performance criteria; 2) reviewing published literature and communicating with industrial and government experts experienced with lining materials and techniques; and 3) characterizing the tailings at three of the sites for calcium concentration, a selection of anions, radionuclides, organic solvents, and acidity levels. The eight materials selected for laboratory testing are: natural soil amended with sodium-saturated montmorillonite (Volclay); locally available clay in conjunction with an asphalt emulsion radon suppression cover; locally available clay in conjunction with a multibarrier radon suppression cover; rubberized asphalt membrane; hydraulic asphalt concrete; chlorosulfonated polyethylene (hypalon) or high-density polyethylene; bentonite, sand and gravel mixture; and catalytic airblown asphalt membrane. The materials will be exposed in test units now being constructed to conditions such as wet/dry cycles, temperature cycles, oxidative environments, ion-exchange elements, etc. The results of the tests will identify the best material for field study. The status report also presents the information gathered during the field studies at Grand Junction, Colorado. Two liners, a bentonite, sand and gravel mixture, and a catalytic airblown asphalt membrane, were installed in a prepared trench and covered with tailings. The liners were instrumented and are being monitored for migration of moisture, radionuclides, and hazardous chemicals. The two liner materials will also be subjected to accelerated laboratory tests for a comparative assessment

  11. 2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title I Disposal Sites

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2014-03-01

    This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) in 2013 at 19 uranium mill tailings disposal sites established under Title I of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978.1 These activities verified that the UMTRCA Title I disposal sites remain in compliance with license requirements. DOE operates 18 UMTRCA Title I sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) in accordance with Title 10 Code of Federal Regulations Part 40.27 (10 CFR 40.27). As required under the general license, a long-term surveillance plan (LTSP) for each site was prepared by DOE and accepted by NRC. The Grand Junction, Colorado, Disposal Site, one of the 19 Title I sites, will not be included under the general license until the open, operating portion of the cell is closed. The open portion will be closed either when it is filled or in 2023. This site is inspected in accordance with an interim LTSP. Long-term surveillance and maintenance services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective actions; and performing administrative, records, stakeholder relations, and other regulatory stewardship functions. Annual site inspections and monitoring are conducted in accordance with site-specific LTSPs and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up or contingency inspections, or corrective action in accordance with the LTSP. LTSPs and site compliance reports are available on the Internet at http://www.lm.doe.gov/.

  12. Environmental assessment of remedial action at the Mexican Hat uranium mill tailings site, Mexican Hat, Utah

    International Nuclear Information System (INIS)

    1987-10-01

    This document assesses the environmental impacts of the proposed remedial action at the Mexican Hat uranium mill tailings site located on the Navajo Reservation in southern Utah. The site covers 235 acres and contains 69 acres of tailings and several of the original mill structures. Remedial action must be performed in accordance with standards and with the concurrence of the US Nuclear Regulatory Commission and the Navajo Nation. The proposed action is to stabilize the tailings within the present tailings site by consolidating the tailings and associated contaminated soils into a recontoured pile. A radon barrier of compacted earth would be constructed over the pile, and various erosion control measures would be taken to assure the long-term stability of the pile. The no action alternative is also assessed in this document. 240 refs., 12 figs., 20 tabs

  13. Revegetation/rock cover for stabilization of inactive U-tailings sites

    International Nuclear Information System (INIS)

    Beedlow, P.A.; Cadwell, L.L.

    1982-01-01

    Soil placed over any sealant/barrier system can provide a protective mantle if the soil is not lost by erosion. Vegetation is an attractive choice for controlling erosion because it can provide an economic self-renewing cover that serves to reduce erosion by both wind and water. Vegetation alone, however, may not adequately stabilize the surface in extremely arid areas. In those areas, a properly designed surface treatment of rock cover, perhaps in conjunction with vegetation, may be necessary to stabilize the tailings surfaces. The objective of this program is to establish guidelines for surface stabilization that are compatible with sealant/barrier systems and that are suited to soils and climates at inactive uranium mill tailings sites. These guidelines will provide the means to estimate potential vegetation cover, potential erosion, effects of surface treatments on sealant/barrier systems, and costs of vegetation and rock covers. Methods for establishing vegetation on sealed tailings will also be provided

  14. Radium, uranium and metals in acidic or alkaline uranium mill

    International Nuclear Information System (INIS)

    Somot, St.

    1997-01-01

    Uranium mill study sites have been chosen in function of their different characteristics: deposits age, treatment nature (alkaline or acid), mill origin. The realization of specific drilling allowed the simultaneous study of the interstitial water and the solid fraction of samples, cut at determined deep. A radiation imbalance between 230 Th and 226 Ra is observed in the acid treatment residues. The trace elements concentration spectrum is directly bound to the nature of the ore. Diamagnetic evolutions are observed in residues. The uranium concentrations are higher in carbonated waters than in calcic sulfated waters. The selective sequential lixiviation showed that the 226 Ra activity of the interstitial water is controlled by the Gypsum in acid treatment residues. In other hand in the alkaline treatment waters, the carbonates occur. The Ra retention is largely bound to the Fe and Mn oxy-hydroxides. (A.L.B.)

  15. Environmental monitoring report on the US Department of Energy's inactive millsite facility, Monticello, Utah, for calendar year 1987

    International Nuclear Information System (INIS)

    1988-05-01

    The inactive Monticello Millsite is located in San Juan County, Utah, just south of the town of Monticello. Environmental monitoring at the site is funded by the Surplus Facilities Management Program (SFMP) and focuses on releases due to preexistent mill tailings. All contaminant discharges result from the leaching of uranium-mill-tailings-related elements by ground water and surface water, and from the release of radon gas and particulate matter into the atmosphere. Pathways facilitating the migration of contaminants from the Monticello site include ground water in the shallow alluvial aquifer underlying the inactive facility, surface water running across the site, and the surrounding atmosphere. Extensive measurement of radon contamination from the tailings piles was conducted during 1984, 1985, and to a lesser extent during 1986 and 1987. On-pile, site-boundary, and off-site atmospheric radon measurements, as well as on- and off-pile radon-flux measurements, were taken. Results of these measurements demonstrate that the EPA standard for radon emissions from inactive uranium processing sites is exceeded at all four tailings piles at the Monticello site. Air particulate monitoring was conducted during 1987 at two on-site locations and at one background location using high-volume Sierra-Anderson model 300 air particulate samplers. So that only the inhalable particles would be collected, 10-micron-size screens were added to the samplers. The maximum airborne concentrations of radium-226, thorium-230, and uranium were all several orders of magnitude below the regulatory limits specified by DOE Order 5480.1. 22 refs., 5 figs., 9 tabs

  16. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Canonsburg, Pennsylvania

    International Nuclear Information System (INIS)

    1994-09-01

    This baseline risk assessment evaluates potential impacts to public health and the environment resulting from ground water contamination from past activities at the former uranium processing site in Canonsburg, Pennsylvania. The US Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Project has placed contaminated material from this site in an on-site disposal cell. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the UMTRA Ground Water Project. Currently, no domestic or drinking water well tap into contaminated ground water of the two distinct ground water units: the unconsolidated materials and the bedrock. Because there is no access, no current health or environmental risks are associated with the direct use of the contaminated ground water. However, humans and ecological organisms could be exposed to contaminated ground water if a domestic well were to be installed in the unconsolidated materials in that part of the site being considered for public use (Area C). The first step is evaluating ground water data collected from monitor wells at the site. For the Canonsburg site, this evaluation showed the contaminants in ground water exceeding background in the unconsolidated materials in Area C are ammonia, boron, calcium, manganese, molybdenum, potassium, strontium, and uranium

  17. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Canonsburg, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    1994-09-01

    This baseline risk assessment evaluates potential impacts to public health and the environment resulting from ground water contamination from past activities at the former uranium processing site in Canonsburg, Pennsylvania. The US Department of Energy Uranium Mill Tailings Remedial Action (UMTRA) Project has placed contaminated material from this site in an on-site disposal cell. Currently, the UMTRA Project is evaluating ground water contamination. This risk assessment is the first document specific to this site for the UMTRA Ground Water Project. Currently, no domestic or drinking water well tap into contaminated ground water of the two distinct ground water units: the unconsolidated materials and the bedrock. Because there is no access, no current health or environmental risks are associated with the direct use of the contaminated ground water. However, humans and ecological organisms could be exposed to contaminated ground water if a domestic well were to be installed in the unconsolidated materials in that part of the site being considered for public use (Area C). The first step is evaluating ground water data collected from monitor wells at the site. For the Canonsburg site, this evaluation showed the contaminants in ground water exceeding background in the unconsolidated materials in Area C are ammonia, boron, calcium, manganese, molybdenum, potassium, strontium, and uranium.

  18. Wind erosion research at an uranium mill tailings site

    International Nuclear Information System (INIS)

    Sehmel, G.A.

    1977-07-01

    A uranium mill tailings pile at Grants, New Mexico, was selected for wind erosion research since the configuration provides flat area containing fine sand and made up of larger particles. The wind erosion experiment is discussed. Experimental equipment consists of meteorological instrumentation to automatically activate air samplers as a function of wind speed increments and direction, particle cascade impactors to measure airborne respirable concentrations as a function of particle size, inertial impaction devices to measure nonrespirable fluxes of airborne particles, a virtual particle cascade impactor to measure airborne concentrations of toxic trace elements, and soil depth gauges to measure changes in surface soil elevations as a function of time. Both radioactive particles as well as toxic trace element concentrations are measured. Radioactive particles are measured with both particle cascade impactors as well as high-volume air samplers. In contrast, toxic trace element airborne concentrations are measured only with a two-stage virtual particle cascade impactor. Fluxes of nonrespirable airborne particles are measured with inertial impaction devices. At particle cascade impactor sites, a rotating cyclone preseparator collects nonrespirable particles. In addition at all sites, fluxes of nonrespirable particles are measured using an open cavity inertial impaction device

  19. EPA's role in uranium mining and milling

    International Nuclear Information System (INIS)

    Smith, P.B.

    1980-01-01

    EPA's role and actions in regulating uranium mining and milling are reviewed and updated. Special emphasis is given to EPA's current activities under the Uranium Mill Tailings Radiation Control Act of 1978

  20. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS)

  1. Reclamation of uranium mining and milling disturbances

    International Nuclear Information System (INIS)

    Farmer, E.E.; Schuman, G.E.

    1987-01-01

    Since 1945 the history of uranium mining and milling in the US has been a story of wide fluctuations in market prices and in mining and milling capacity. The late 1960's and the 1970's saw a sizeable reduction in the production of yellowcake because of an earlier over-supply, a leveling off of the military demand, and a failure of the nuclear electric power industry to create the anticipated commercial demand. The decline in the domestic production of yellowcake has continued through the early 1980's to the present. Today, there are five operating uranium mills in the US: one in Wyoming, two in Utah, one in New Mexico, and one in Texas. Of these five mills, three are operating on a reduced schedule, as little as three days a month. A significant portion of the current US production of uranium goes overseas to fulfill Japanese, French, and other European contracts. There is still a sizeable reclamation job to be accomplished on old uranium wastes, both tailings impoundments and overburden embankments. Before the Uranium Mill Tailings Control Act of 1978 (PL 95-604), reclamation was frequently omitted altogether, or else done in a haphazard fashion. We do not know the total area of unreclaimed, radioactive, uranium overburden wastes in the western US, but the area is large, probably several thousand hectares. Fortunately, these overburden wastes are almost entirely located in remote areas. Mill tailings are more difficult to reclaim than overburden, and tailings represent a more serious health hazards. There are approximately 25 million metric tons of unreclaimed uranium mill tailings, with variable health hazards, located in the US

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Lakeview, Oregon. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the UMTRA Project site near Lakeview, Oregon, was completed in 1989. The mill operated from February 1958 to November 1960. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  3. Long-term stabilization of uranium mill tailings

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Sale, M.J.; Webb, J.W.; Mulholland, P.J.

    1983-01-01

    The primary hazard associated with uranium mill tailings is exposure to a radioactive gas, radon-222, the concentration of which has been correlated with the occurrence of lung cancer. Previous studies on radon attenuation conclude that the placement of earthen cover materials over the tailings is the most effective technique for reducing radioactive emissions and dispersal of tailings. The success of such a plan, however, is dependent on ensuring the long-term integrity of these cover materials. Soil erosion from water and wind is the major natural cause of destabilizing earthen cover materials. Field data related to the control of soil loss are limited and only indirectly apply to the problem of isolation of uranium mill tailings over very long time periods (up to 80,000 a). However, sufficient information is available to determine benefits that will result from the changes in specific design variables and to evaluate the need for different design strategies among potential disposal sites. The three major options available for stabilization of uranium mill tailings are: rock cover, soil and revegetation, or a combination of both on different portions of the tailings cover. The optimal choice among these alternatives depends on site-specific characteristics such as climate and local geomorphology and soils, and on design variables such as embankment, heights and slopes, modification of upstream drainage, and revegetation practices. Generally, geomorphic evidence suggests that use of soil and vegetation alone will not be adequate to reduce erosion on slopes greater than about 5 to 9%

  4. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs.

  5. Environmental assessment of remedial action at the Shiprock uranium mill tailings site, Shiprock, New Mexico: Volume 1, Text

    International Nuclear Information System (INIS)

    1984-05-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the shiprock uranium mill tailings site located on the Navajo Indian Reservation, one mile south of Shiprock, New Mexico. The site contains 72 acres of tailings and four of the original mill buildings. The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated properties off the site. The US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the concurrence of the Nuclear Regulatory Commission. The proposed action is to stabilize the tailings at their present location by consolidating the tailings and associated contaminated soils into a recontoured pile. A seven-foot-thick radon barrier would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Three other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a more remote location. The no action alternative is also assessed. 99 refs., 40 figs., 58 tabs

  6. Radionuclides in the terrestrial ecosystem near a Canadian uranium mill -- Part 2: Small mammal food chains and bioavailability

    Energy Technology Data Exchange (ETDEWEB)

    Thomas, P.A.

    2000-06-01

    Food chain transfer through the soil-vegetation-small mammal food chain was measured by concentration ratios (CRs) for uranium, {sup 226}Ra, {sup 210}Pb, and {sup 210}Po at three sites near the Key Lake uranium mill in northern Saskatchewan. Plant/soil CRs, animal carcass/GI tract CRs, and animal/soil CRs were depressed at sites impacted by mill and tailings dusts relative to a nearby control site. Thus, radionuclides associated with large particulates in tailings and/or ore dusts may be less bioavailable to terrestrial plants and animals than natural sources of radioactive dust. These results show that reliance on default food chain transfer parameters, obtained from uncontaminated terrestrial ecosystems, may overpredict impacts at uranium mine and mill sites. Given the omnivorous diet of small mammals and birds, animal/soil CRs are recommended as the most cost-effective and robust means of predicting animal concentrations from environmental monitoring data at uranium mill facilities.

  7. Radionuclides in the terrestrial ecosystem near a Canadian uranium mill -- Part 2: Small mammal food chains and bioavailability

    International Nuclear Information System (INIS)

    Thomas, P.A.

    2000-01-01

    Food chain transfer through the soil-vegetation-small mammal food chain was measured by concentration ratios (CRs) for uranium, 226 Ra, 210 Pb, and 210 Po at three sites near the Key Lake uranium mill in northern Saskatchewan. Plant/soil CRs, animal carcass/GI tract CRs, and animal/soil CRs were depressed at sites impacted by mill and tailings dusts relative to a nearby control site. Thus, radionuclides associated with large particulates in tailings and/or ore dusts may be less bioavailable to terrestrial plants and animals than natural sources of radioactive dust. These results show that reliance on default food chain transfer parameters, obtained from uncontaminated terrestrial ecosystems, may overpredict impacts at uranium mine and mill sites. Given the omnivorous diet of small mammals and birds, animal/soil CRs are recommended as the most cost-effective and robust means of predicting animal concentrations from environmental monitoring data at uranium mill facilities

  8. Environmental assessment of remedial action at the Lowman Uranium Mill Tailings Site near Lowman, Idaho

    International Nuclear Information System (INIS)

    1991-01-01

    This document assesses the environmental impacts of stabilization on site of the contaminated materials at the Lowman uranium mill tailings site. The Lowman site is 0.5 road mile northeast of the unincorporated village of Lowman, Idaho, and 73 road miles from Boise, Idaho. The Lowman site consists of piles of radioactive sands, an ore storage area, abandoned mill buildings, and windblown/waterborne contaminated areas. A total of 29.5 acres of land are contaminated and most of this land occurs within the 35-acre designated site boundary. The proposed action is to stabilize the tailings and other contaminated materials on the site. A radon barrier would be constructed over the consolidated residual radioactive materials and various erosion control measures would be implemented to ensure the long-term stability of the disposal cell. Radioactive constituents and other hazardous constituents were not detected in the groundwater beneath the Lowman site. The groundwater beneath the disposal cell would not become contaminated during or after remedial action so the maximum concentration limits or background concentrations for the contaminants listed in the draft EPA groundwater protection standards would be met at the point of compliance. No significant impacts were identified as a result of the proposed remedial action at the Lowman site

  9. French uranium mining sites remediation

    International Nuclear Information System (INIS)

    Roche, M.

    2002-01-01

    Following a presentation of the COGEMA's general policy for the remediation of uranium mining sites and the regulatory requirements, the current phases of site remediation operations are described. Specific operations for underground mines, open pits, milling facilities and confining the milled residues to meet long term public health concerns are detailed and discussed in relation to the communication strategies to show and explain the actions of COGEMA. A brief review of the current remediation situation at the various French facilities is finally presented. (author)

  10. Mathematical simulation of contaminant distribution in and around the uranium mill tailing piles, Riverton, Wyoming

    International Nuclear Information System (INIS)

    Narasimhan, T.N.; Tokunaga, T.; White, A.F.; Smith, A.R.

    1984-01-01

    The ultimate objective of the Uranium Mill Tailings Remedial Action Project (UMTRAP) is to minimize the potential environmental hazards due to the existing inactive uranium mill tailing piles. One of these sites, at Riverton, Wyoming, is located on the flood plain of the Wind River, with the water table lying within a few meters of the bottom of the tailings. Field data clearly indicates that contaminants, both radioactive and non-radioactive, are mobile within the tailings as well as in the adjacent ground water system. From the point of view of remedial action, the following important questions arise: At what rates and quantities will the contaminants continue to migrate in the ground water system over the next several hundred years. What will be the soil-water regime in the upper part of the tailings which controls the migration of radon gas to the atmosphere. In view of the projected system behavior, what are the economically viable and environmentally acceptable engineering solutions for remedy. The purpose of the mathematical modeling efforts at the Riverton site is to address the question of prediction; the transport of contaminants in the ground water system as well as the dynamic soil-water regime near the upper boundary. The use of mathematical models for the above purpose is dictated by the following questions: Do adequate computational models exist that can simulate the physico-chemical processes that characterize the mill tailings. Can these models reasonably explain the chemical evolution of the system since the beginning of the tailings emplacement. If so, can the historical behavior be used as the basis for predicting the behavior over the next several hundred years

  11. Process for Transition of Uranium Mill Tailings Radiation Control Act Title II Disposal Sites to the U.S. Department of Energy Office of Legacy Management for Long-Term Surveillance and Maintenance

    Energy Technology Data Exchange (ETDEWEB)

    None

    2012-03-01

    This document presents guidance for implementing the process that the U.S. Department of Energy (DOE) Office of Legacy Management (LM) will use for assuming perpetual responsibility for a closed uranium mill tailings site. The transition process specifically addresses sites regulated under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) but is applicable in principle to the transition of sites under other regulatory structures, such as the Formerly Utilized Sites Remedial Action Program.

  12. Transport and fate of ammonium and its impact on uranium and other trace elements at a former uranium mill tailing site

    International Nuclear Information System (INIS)

    Miao, Ziheng; Akyol, Hakan N.; McMillan, Andrew L.; Brusseau, Mark L.

    2013-01-01

    Highlights: • Nitrification of ammonium evidenced by stable isotopes of nitrate at a mining site. • Concentrations of uranium and other trace elements related to ammonium conc. • Observed impact of ammonium on redox, pH, and possibly complexation. • Proposed impact of transformation of NO 3 and NH 4 on trace elements. - Abstract: The remediation of ammonium-containing groundwater discharged from uranium mill tailing sites is a difficult problem facing the mining industry. The Monument Valley site is a former uranium mining site in the southwest US with both ammonium and nitrate contamination of groundwater. In this study, samples collected from 14 selected wells were analyzed for major cations and anions, trace elements, and isotopic composition of ammonium and nitrate. In addition, geochemical data from the U.S. Department of Energy (DOE) database were analyzed. Results showing oxic redox conditions and correspondence of isotopic compositions of ammonium and nitrate confirmed the natural attenuation of ammonium via nitrification. Moreover, it was observed that ammonium concentration within the plume area is closely related to concentrations of uranium and a series of other trace elements including chromium, selenium, vanadium, iron, and manganese. It is hypothesized that ammonium–nitrate transformation processes influence the disposition of the trace elements through mediation of redox potential, pH, and possibly aqueous complexation and solid-phase sorption. Despite the generally relatively low concentrations of trace elements present in groundwater, their transport and fate may be influenced by remediation of ammonium or nitrate at the site

  13. The use of atomic absorption spectroscopy to measure arsenic, selenium, molybdenum, and vanadium in water and soil samples from uranium mill tailings sites

    International Nuclear Information System (INIS)

    Hollenbach, M.H.

    1988-01-01

    The Technical Measurements Center (TMC) was established to support the environmental measurement needs of the various DOE remedial action programs. A laboratory intercomparison study conducted by the TMC, using soil and water samples from sites contaminated by uranium mill tailings, indicated large discrepancies in analytical results reported by participating laboratories for arsenic, selenium, molybdenum, and vanadium. The present study was undertaken to investigate the most commonly used analytical techniques for measuring these four elements, ascertain routine and reliable quantification, and assess problems and successes of analysts. Based on a survey of the technical literature, the analytical technique of atomic absorption spectroscopy was selected for detailed study. The application of flame atomic absorption, graphite furnace atomic absorption, and hydride generation atomic absorption to the analysis of tailings-contaminated samples is discussed. Additionally, laboratory sample preparation methods for atomic absorption spectroscopy are presented. The conclusion of this report is that atomic absorption can be used effectively for the determination of arsenic, selenium, molybdenum, and vanadium in water and soil samples if the analyst understands the measurement process and is aware of potential problems. The problem of accurate quantification of arsenic, selenium, molybdenum, and vanadium in water and soil contaminated by waste products from uranium milling operations affects all DOE remedial action programs [Surplus Facilities Management Program (SFMP), Formerly Utilized Site Remedial Action Program (FUSRAP), and Uranium Mill Tailings Remedial Action Program (UMTRAP)], since all include sites where uranium was processed. 96 refs., 9 figs

  14. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Slick Rock, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    Two UMTRA (Uranium Mill Tailings Remedial Action) Project sites are near Slick Rock, Colorado: the North Continent site and the Union Carbide site. Currently, no one uses the contaminated ground water at either site for domestic or agricultural purposes. However, there may be future land development. This risk assessment evaluates possible future health problems associated with exposure to contaminated ground water. Since some health problems could occur, it is recommended that the contaminated ground water not be used as drinking water

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Slick Rock, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    Two UMTRA (Uranium Mill Tailings Remedial Action) Project sites are near Slick Rock, Colorado: the North Continent site and the Union Carbide site. Currently, no one uses the contaminated ground water at either site for domestic or agricultural purposes. However, there may be future land development. This risk assessment evaluates possible future health problems associated with exposure to contaminated ground water. Since some health problems could occur, it is recommended that the contaminated ground water not be used as drinking water.

  16. Radiological characteristics and radiation protection requirements in the remediation of uranium mining and milling sites in Hungary

    International Nuclear Information System (INIS)

    Juhasz, L.; Szerbin, P.; Lendvai, Z.; Csoevari, M.; Benkovics, I.; Varhegyi, A.

    2002-01-01

    After more than 35 years of operation the uranium mining and milling facilities located near the city of Pecs in the south of Hungary were finally shut down by the end of 1997. Appropriate strategies and complex plans have been prepared for the implementation of remedial action. The main principle involved in the planning of site restoration work is the application of a step-by-step approach, taking into account local conditions in the given area to the maximum extent possible. As every site considered for restoration has its own particular specifications, different solutions are, in effect, needed for each individual mining and milling site. Due to the lack of approved national regulations, a written authorisation must be obtained in relation to specific issues affecting remedial action. The radiological requirements affecting both the reuse and restoration of affected areas call for the establishment of radiation limits. (orig.)

  17. Regulatory Oversight of the Legacy Gunner Uranium Mine and Mill Site in Northern Saskatchewan, Canada - 13434

    Energy Technology Data Exchange (ETDEWEB)

    Stenson, Ron; Howard, Don [Canadian Nuclear Safety Commission, P.O. Box 1046, Station B, 280 Slater Street, Ottawa ON K1P 5S9 (Canada)

    2013-07-01

    As Canada's nuclear regulator, the Canadian Nuclear Safety Commission (CNSC) is responsible for licensing all aspects of uranium mining, including remediation activities at legacy sites. Since these sites already existed when the current legislation came into force in 2000, and the previous legislation did not apply, they present a special case. The Nuclear Safety and Control Act (NSCA), was written with cradle-to- grave oversight in mind. Applying the NSCA at the end of a 'facilities' life-cycle poses some challenges to both the regulator and the proponent. When the proponent is the public sector, even more challenges can present themselves. Although the licensing process for legacy sites is no different than for any other CNSC license, assuring regulatory compliance can be more complicated. To demonstrate how the CNSC has approached the oversight of legacy sites the history of the Commission's involvement with the Gunnar uranium mine and mill site provides a good case study. The lessons learned from the CNSC's experience regulating the Gunnar site will benefit those in the future who will need to regulate legacy sites under existing or new legislation. (authors)

  18. Baseline risk assessment for groundwater contamination at the uranium mill tailings site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1990-11-01

    The Gunnison Baseline Risk Assessment for Groundwater Contamination at the Uranium Mill Tailings Site was performed to determine if long-term use of groundwater from domestic wells near the site has a potential for adverse health effects. The risk assessment was based on the results of sampling domestic wells during 1989--1990. A risk assessment evaluates health risks by comparing the amount of a contaminant taken in by a person with the amount of the contaminant that may be toxic. The Gunnison Risk Assessment used high intake values to estimate the maximum levels a person might be exposed to. The results of the risk assessment are divided into cancer (carcinogenic) risks and non-carcinogenic risks. Five key contaminants were evaluated for adverse health risks: uranium, manganese, lead antimony, and cadmium. Due to the potential health risks and the unavoidable uncertainties associated with limited groundwater and toxicity data, it is prudent public health policy to provide a permanent alternate water supply. Additionally, providing a permanent alternate water supply is cost-effective compared to long-term routine monitoring

  19. Radon releases from Australian uranium mining and milling projects: assessing the UNSCEAR approach.

    Science.gov (United States)

    Mudd, Gavin M

    2008-02-01

    The release of radon gas and progeny from the mining and milling of uranium-bearing ores has long been recognised as a potential radiological health hazard. The standards for exposure to radon and progeny have decreased over time as the understanding of their health risk has improved. In recent years there has been debate on the long-term releases (10,000 years) of radon from uranium mining and milling sites, focusing on abandoned, operational and rehabilitated sites. The primary purpose has been estimates of the radiation exposure of both local and global populations. Although there has been an increasing number of radon release studies over recent years in the USA, Australia, Canada and elsewhere, a systematic evaluation of this work has yet to be published in the international literature. This paper presents a detailed compilation and analysis of Australian studies. In order to quantify radon sources, a review of data on uranium mining and milling wastes in Australia, as they influence radon releases, is presented. An extensive compilation of the available radon release data is then assembled for the various projects, including a comparison to predictions of radon behaviour where available. An analysis of cumulative radon releases is then developed and compared to the UNSCEAR approach. The implications for the various assessments of long-term releases of radon are discussed, including aspects such as the need for ongoing monitoring of rehabilitation at uranium mining and milling sites and life-cycle accounting.

  20. Radon releases from Australian uranium mining and milling projects: assessing the UNSCEAR approach

    International Nuclear Information System (INIS)

    Mudd, Gavin M.

    2008-01-01

    The release of radon gas and progeny from the mining and milling of uranium-bearing ores has long been recognised as a potential radiological health hazard. The standards for exposure to radon and progeny have decreased over time as the understanding of their health risk has improved. In recent years there has been debate on the long-term releases (10,000 years) of radon from uranium mining and milling sites, focusing on abandoned, operational and rehabilitated sites. The primary purpose has been estimates of the radiation exposure of both local and global populations. Although there has been an increasing number of radon release studies over recent years in the USA, Australia, Canada and elsewhere, a systematic evaluation of this work has yet to be published in the international literature. This paper presents a detailed compilation and analysis of Australian studies. In order to quantify radon sources, a review of data on uranium mining and milling wastes in Australia, as they influence radon releases, is presented. An extensive compilation of the available radon release data is then assembled for the various projects, including a comparison to predictions of radon behaviour where available. An analysis of cumulative radon releases is then developed and compared to the UNSCEAR approach. The implications for the various assessments of long-term releases of radon are discussed, including aspects such as the need for ongoing monitoring of rehabilitation at uranium mining and milling sites and life-cycle accounting

  1. Environmental analysis and data report prepared for the environmental assessment of remedial action at the inactive uranium mill tailings site near Falls City, Texas

    International Nuclear Information System (INIS)

    1991-12-01

    This document contains information and data gathered in support of the preparation of the environmental assessment (EA) of the proposed remedial action at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Falls City, Texas. The Falls City EA was prepared pursuant to the National Environmental Policy Act (NEPA), which requires Federal agencies to assess the impacts of their actions on the environment. It examines the short- and long-term effects of the US Department of Energy's (DOE) remedial action for the Falls City site as well as the no action alternative. The DOE will use the information and analyses presented in the EA to determine whether the proposed action would have a significant impact on the environment. If the impacts are determined to be significant, an environmental impact statement (EIS) will be prepared. If the impacts are not determined to be significant, the DOE may issue a Finding of No Significant Impact (FONSI) and implement the proposed action. The information and data presented in this report are for background purposes only and are not required as part of the NEPA decision-making process

  2. Implementation of the Additional Protocol: Verification activities at uranium mines and mills

    International Nuclear Information System (INIS)

    Bragin, V.; Carlson, J.; Leslie, R.

    2001-01-01

    Full text: The mining and milling of uranium is the first in a long chain of processes required to produce nuclear materials in a form suitable for use in nuclear weapons. Misuse of a declared uranium mining/milling facility, in the form of understatement of production, would be hard to detect with the same high level of confidence as afforded by classical safeguards on other parts of the nuclear fuel cycle. For these reasons, it would not be cost-effective to apply verification techniques based on classical safeguards concepts to a mining/milling facility in order to derive assurance of the absence of misuse. Indeed, these observations have been recognised in the Model Protocol (INFCIRC/540): 'the Agency shall not mechanistically or systematically seek to verify' information provided to it by States (Article 4.a.). Nevertheless, complementary access to uranium mining/milling sites 'on a selective basis in order to assure the absence of undeclared nuclear material and activities' (Article 4.a.(i)) is provided for. On this basis, therefore, this paper will focus predominantly on options other than site access, which are available to the Agency for deriving assurance that declared mining/milling operations are not misused. Such options entail the interpretation and analysis of information provided to the Agency including, for example, from declarations, monitoring import/export data, open source reports, commercial satellite imagery, aerial photographs, and information provided by Member States. Uranium mining techniques are diverse, and the inventories, flows and uranium assays which arise at various points in the process will vary considerably between mines, and over the operating cycle of an individual mine. Thus it is essentially impossible to infer any information, which can be used precisely to confirm, or otherwise, declared production by measuring or estimating any of those parameters at points within the mining/milling process. The task of attempting to

  3. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service.

  4. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado

    International Nuclear Information System (INIS)

    1993-09-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands assessment (Assessment 2) are included as part of this EA. The following sections and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service

  5. Update of NRC uranium mill licensing activities

    International Nuclear Information System (INIS)

    Martin, J.B.

    1978-01-01

    Increased vigilance must be given to controlling emissions from active milling operations, particularly windblown tailings, to assure that the soon-to-be-effective EPA Fuel Cycle Standard is met. Comprehensive environmental monitoring programs will have to be developed to confirm that, in fact, the limit is met. Just as was the case last year, tailings management and disposal is still the major item of concern relating to uranium milling operations. As stated earlier, the NRC feels that below-grade disposal is the preferred method of tailings disposal in that it provides the greatest assurances of long-term isolation. In any event, tailings must be disposed of in such a way that no active care is required of disposal sites, to avoid committing future generations to a significant, lingering obligation to care for wastes generated to produce benefits which they will only indirectly receive, if at all. While the primary means of providing long-term isolation of tailings must be by physical barriers, as a prudent, supplementary measure of control, we are concluding in the GEIS on Uranium Milling that ownership of disposal sites by a Government agency is desirable. We expect a low level of continued surveillance at disposal sites with small expense involved. We are concluding that requiring operators to contribute on the order of $100,000 per disposal site to cover ongoing expenses would be the most apropriate means of conforming to the principle that the waste generator should pay full costs of waste disposal. We feel such an arrangement would be fair, simple, and efficient, favoring it over complicated schemes involving such things as taxes on product or tailings generated and continued management of ear-marked funds. Legislation is now pending in the Congress which would give NRC direct regulatory control over mill tailings and put into place the authorities needed to implement the long-term control and funding arrangements discussed above

  6. Experience in the transport and disposal of uranium mill tailings from Aldama City to Sierra Pena Blanca in Chihuahua, Mexico

    International Nuclear Information System (INIS)

    Ruiz, M.; Molina, G.; Angeles C, A.; Cruz G, S.; Lizacano C, D.; Reyes, J.; Rojas, V.

    1996-01-01

    In the process of decontamination, transport and disposal of uranium mill tailings, in the state of Chihuahua, Mexico, was necessary the multidisciplinary and multi institutional task to select mainly the site for the final disposal. The uranium mill tailings content Ra-226 which half live time is 1600 years, therefore the site should be adequately stable, a remote place of population, and which containment will survive for thousand of years. The decontamination of site where the uranium mill tailings were 25 years ago, required the application of norms from regulator organism. For the transport of uranium mill tailings was necessary that the vehicles had devices to reduce the dispersion of material in the road. The selection of the site was product of balance between the cost of transport and the final disposal. To typify the site, studies of hydrology, meteorology, ecology, geology and seismology were performed. On the other hand, the decision to locate the deposit in the site was due to dispersion of material by the rain, wind and bowls. (authors). 3 refs., 1 fig., 1 tab

  7. Radiation health and safety aspects in uranium milling

    International Nuclear Information System (INIS)

    Smart, B.C.

    1982-01-01

    This presentation deals mainly with radiation levels associated with the uranium milling operations, including yellowcake production. The regulation of uranium mills has not received much attention in the past because radiation levels have been generally low, and uranium milling has been substantially free of occupational illness. More attention is being directed towards minimizing exposures, and the Canadian Atomic Energy Control Board is working on new regulations which will reflect the recommendations of various hearings and the International Commission on Radiological Protection. Emphasis is now being placed on improving monitoring methods. At the beginning of 1982 a gamma dosimetry program will be put into effect for all uranium mine and mill workers. An improved method is also being sought to determine radon daughter exposures more accurately. It is expected that a better knowledge of monitoring and assessing thoron daughter levels in mine and mill facilities will be obtained soon. This radiation contribution will be included when calculating a combined radiation exposure factor for individual workers. Programs are underway to better monitor and assess uranium dust inhalation. Initial studies indicate that the present precautions taken to avoid dust inhalation at the mills are effective. A more complete study will be undertaken in 1982

  8. Romanian regulatory framework for uranium mining and milling (present and future)

    International Nuclear Information System (INIS)

    Rodna, A.L.; Dumitrescu, N.

    2002-01-01

    In Romania, all operations in the nuclear field, including uranium mining and milling, are regulated by Law no. 111/1996 (republished in 1998), regarding the safe conduct of nuclear activities. These activities can be performed only on the basis of an authorization released by the national regulatory authority, i.e. the National Commission for Nuclear Activities Control. The specific requirements which must be carried out by the owner of an operating licence for a uranium mining and milling operation are stipulated by the Republican Nuclear Safety Norms for Geological Research, Mining and Milling of Nuclear Raw Materials. These regulatory requirements have been in force since 1975. The regulatory norms include provisions that the effective dose limit for workers should not exceed 50 mSv/year and also that liquid effluents released into surface waters must have a content of natural radioactive elements that meets the standards for drinking water. The norms do not contain provisions concerning the conditions under which the mining sites and the uranium processing facilities can be shut down and decommissioned. The norms also do not contain requirements regarding either the rehabilitation of environments affected by abandoned mining and milling activities, nor criteria for the release of the rehabilitated sites for alternative uses. To implement the provisions of Council Directive 96/29 EURATOM in Romania, new Fundamental Radiological Protection Norms have been approved and will soon be published in the 'Monitorul Official' (Official Gazette of Romania). One of the main provisions of these norms is the reduction of the effective dose limit for the workers to 20 mSv/year. Changes in the Republican Nuclear Safety Norms for Geological Research, Mining and Milling of Nuclear Raw Materials, are also planned; these changes will be consistent with the Fundamental Radiological Protection Norms. To cover existing gaps, the new norms for uranium mining and milling will include

  9. Long-term stabilization of uranium mill tailings

    International Nuclear Information System (INIS)

    Voorhees, L.D.; Sale, M.J.; Webb, J.W.; Mulholland, P.J.

    1984-01-01

    The primary hazard associated with uranium mill tailings is exposure to a radioactive gas, radon-222, the concentration of which has been correlated with the occurrence of lung cancer. Previous studies on radon attenuation conclude that the placement of earthen cover materials over the tailings is the most effective technique for reducing radioactive emissions and dispersal of tailings. The success of such a plan, however, is dependent on ensuring the long-term integrity of these cover materials. Soil erosion from water and wind is the major natural cause of destabilizing earthen cover materials. Field data related to the control of soil loss are limited and only indirectly apply to the problem of isolation of uranium mill tailings over very long time periods (up to 80,000 a). However, sufficient information is available to determine benefits that will result from changes in specific design variables and to evaluate the need for different design strategies among potential disposal sites. The three major options available for stabilization of uranium mill tailings are (1) rock cover, (2) soil and revegetation, or (3) a combination of both on different portions of the tailings cover. The optimal choice among these alternatives depends on site-specific characteristics such as climate and local geomorphology and soils, and on design variables such as embankment heights and slopes, modification of upstream drainage, and revegetation practices. Generally, geomorphic evidence suggests that use of soil and vegetation alone will not be adequate to reduce erosion on slopes greater than about 5 to 9%. For these steeper slopes, the use of rock talus or riprap will be necessary to maximize the probability of long-term stability. The use of vegetation to control erosion on the flatter portions of the site may be practicable in regions of the USA with sufficient rainfall and suitable soil types, but revegetation practices must be carefully evaluated to ensure that long

  10. Baseline risk assessment of ground water contamination at the inactive uriniferous lignite ashing site near Belfield, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-08-01

    This Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Belfield, North Dakota, evaluates potential impacts to public health or the environment resulting from ground water contamination at the site where coal containing uranium was burned to produce uranium. The US Department of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project is evaluating plans to remedy soil and ground water contamination at the site. Phase I of the UMTRA Project consists of determining the extent of soil contamination. Phase II of the UMTRA Project consists of evaluating ground water contamination. Under Phase II, results of this risk assessment will help determine what remedial actions may be necessary for contaminated ground water at the site. This risk assessment evaluates the potential risks to human health and the environment resulting from exposure to contaminated ground water as it relates to historic processing activities at the site. Potential risk is quantified for constituents introduced from the processing activities, and not for those constituents naturally occurring in water quality in the site vicinity. Background ground water quality has the potential to cause adverse health effects from exposure through drinking. Any risks associated with contaminants attributable to site activities are incremental to these risks from background ground water quality. This incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition.

  11. Baseline risk assessment of ground water contamination at the inactive uraniferous lignite ashing site near Belfield, North Dakota

    International Nuclear Information System (INIS)

    1994-08-01

    This Baseline Risk Assessment of Ground Water Contamination at the Inactive Uraniferous Lignite Ashing Site Near Belfield, North Dakota, evaluates potential impacts to public health or the environment resulting from ground water contamination at the site where coal containing uranium was burned to produce uranium. The US Department of Energy's Uranium Mill Tailings Remedial Action (UMTRA) Project is evaluating plans to remedy soil and ground water contamination at the site. Phase I of the UMTRA Project consists of determining the extent of soil contamination. Phase II of the UMTRA Project consists of evaluating ground water contamination. Under Phase II, results of this risk assessment will help determine what remedial actions may be necessary for contaminated ground water at the site. This risk assessment evaluates the potential risks to human health and the environment resulting from exposure to contaminated ground water as it relates to historic processing activities at the site. Potential risk is quantified for constituents introduced from the processing activities, and not for those constituents naturally occurring in water quality in the site vicinity. Background ground water quality has the potential to cause adverse health effects from exposure through drinking. Any risks associated with contaminants attributable to site activities are incremental to these risks from background ground water quality. This incremental risk from site-related contaminants is quantified in this risk assessment. The baseline risk from background water quality is incorporated only into the assessment of potential chemical interactions and the definition of the overall site condition

  12. Evaluation of the mill tailings disposal site at the Zirovski vrh uranium mine in Slovenia

    International Nuclear Information System (INIS)

    Begus, T.; Kocevar, M.; Brencic, M.; Likar, B.; Logar, Z.

    2002-01-01

    Uranium mine Zirovski vrh in Slovenia was closed due to economic reasons. After that extensive work on decommission was done. The results of the comparison between three potential sites for mill tailings are presented. The results of the probabilistic approach to the factors of safety and confidence, seismic hazard analysis, hydrogeological models and in the economic evaluation are given. For the common evaluation they were interpreted in the way of UMTRA decision matrix. On the basis of the engineering judgement calculations for the recent status and the status after 1000 years was performed. (author)

  13. Environmental assessment of remedial action at the Maybell Uranium Mill Tailings Site near Maybell, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment (Attachment 1) and a floodplain/wetlands attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  14. Management of wastes from uranium mines and mills

    International Nuclear Information System (INIS)

    Thomas, K.T.

    1981-01-01

    Uranium mining and milling operations have not given rise to much concern about their hazards, and with advancing technologies for mill processing and waste management, the situation will continue to improve. However, the disposal of large quantities of waste produced in mining and milling does have an environmental impact, owing to the long half-lives and the ready availability of the toxic radionuclides Ra-226 and Rn-222. This article deals with the management of wastes from uranium mines and mills

  15. Long-term stabilization considerations for decommissioned and reclaimed uranium sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.; Johnson, T.L.

    1988-01-01

    The long-term stabilization of decommissioned uranium mill sites and of reclaimed uranium mill tailings sites encompass a broad spectrum of design capabilities. This paper presents a few of the quantitative methodologies recently developed or refined to evaluate physical factors (i.e. precipitation, fluvial geomorphology, stable slope, slope stabilization with riprap and riprap selection) that influence long-term stabilization of uranium mill and mill tailings sites. It is acknowledged that the degree of refinement of these methodologies are in their infancy and that extensive research and development are warranted to increase the level of assurance. However, these methodologies provide an initial guideline for evaluating long-term stabilization that has not been previously existed. The purpose of this paper is to present a review of currently available state-of-the-art engineering techniques and methodologies for the evaluation of reclamation plans designed to provide long-term stability against potential failure modes. In some cases, evaluative techniques have been developed for long-term stabilization where methodologies have not previously existed. Each methodology to be presented represents a starting point upon which additional research and/or development may be warranted

  16. Summary of the Phase II, Title I engineering assessment of inactive uranium mill tailings, Lowman Site, Lowman, Idaho

    International Nuclear Information System (INIS)

    1977-12-01

    An engineering assessment was performed of the problems resulting from the existence of radioactive uranium sand residues at the Lowman, Idaho site. Services included the preparation of topographic maps, the performance of core drillings and radiometric measurements sufficient to determine areas and volumes of tailings and other radium-contaminated materials, the evaluation of resulting investigation of site hydrology and meteorology, and the evaluation and costing of alternative corrective actions. Radon gas release from the 90,000 tons of sand residues at the Lowman site constitutes the most significant environmental impact, although external gamma radiation is also a factor. The two alternative actions presented are dike construction, fencing, and maintenance; and consolidation of the piles, addition of a 2-ft-thick stabilization cover, and on-site cleanup. Both options include remedial action at off-site structures. Cost estimates for the two options are $393,000 and $590,000

  17. Current uranium mill licensing issues

    International Nuclear Information System (INIS)

    Scarano, R.A.

    1977-01-01

    The problems encountered to insure environmentally safe mining and milling of uranium ores are reviewed. Emphasis is placed on the management of tailings resulting from milling operations. It is pointed out that although the concentration of radioactivity in the tailings is relatively low, control measures are necessary because of the large quantities involved and because of the long half-life of the parent radionuclides present. The major concerns with mill tailings are radon release to the atmosphere and isolation of the tailings from the human environment. Since it is anticipated that the amount of tailings created by the year 2000 will be more than an order of magnitude greater than the quantities that have been generated during the past 30 years, it is recommended that all mill tailings storage areas be located remote from public contact and in areas such that disruption and dispersion by natural forces and seepage of toxic materials into ground water systems are reduced to the maximum extent achievable. Technical issues that receive attention during the NRC licensing process for uranium mills and the preparation of environmental impact statements are discussed briefly

  18. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    Energy Technology Data Exchange (ETDEWEB)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  19. Uranium Mill Tailings Remedial Action Project 1993 Environmental Report

    International Nuclear Information System (INIS)

    1994-10-01

    This annual report documents the Uranium Mill Tailing Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1993, surface remedial action was complete at 10 of the 24 designated UMTRA Project processing sites. In 1993 the UMTRA Project office revised the UMTRA Project Environmental Protection Implementation Plan, as required by the US DOE. Because the UMTRA Project sites are in different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  20. Uranium mill tailings remediation in the USA. A history and lessons learned - 59407

    International Nuclear Information System (INIS)

    Rima, Steve

    2012-01-01

    Document available in abstract form only. Full text of publication follows: Since the 1940's uranium ores have been processed at various locations in the United States to extract and produce uranium and other concentrated materials, first for government (weapons) research and production, and then for nuclear power production. The tailings residue from the uranium milling process contained radioactive (primarily Ra-226) and hazardous chemicals. Large volumes of tailings were produced during the milling process. In the early history of this process the tailings were not recognized as hazardous and were released to the general public for a wide variety of uses, resulting in significant spread of contamination in the vicinity of many operating mills. In the late 1960's and early 1970's laws were enacted at the state and federal level to begin to deal with the legacy of this contamination. Over the course of the next several decades various regulatory agencies were responsible for remediating these sites. Different approaches were used, different end points and definitions of clean were used, and very large sums of public funding were spent on remediating these sites. Rarely was the cost commensurate with the risk reduction obtained through remediation. This paper will present an overview of the history of the uranium mill tailings regulatory and remediation program in the United States, the cost of the program compared to risk reduction, successes and failures, and important lessons learned that should be applied to future efforts in this area. (author)

  1. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment

  2. Baseline risk assessment of ground water contamination at the uranium mill tailings sites near Rifle, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    The US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase 1) and the Ground Water Project (Phase 2). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment.

  3. Radiation protection in uranium mining and milling industry

    International Nuclear Information System (INIS)

    Raghavayya, M.

    2005-01-01

    The first phase of the Nuclear Fuel Cycle is exploration for uranium and the next is mining and milling of uranium ore. This phase is mostly characterised by low levels of radioactivity and radiation exposure of the workers involved. Yet it is a paradoxical truth that incidence of cancer among the work force, especially miners, due to occupational radiation exposure (from radon and decay products) has been proved only in uranium mines in the entire Nuclear Fuel Cycle. Of course such incidence occurred before the detrimental effect of radiation exposure was realised and understood. Therefore it is important to familiarise oneself with the radiation hazards prevalent in the uranium mining and milling facilities so as to take appropriate remedial measures for the protection of not only the workers but also the public at large. There are both open cast and underground uranium mines around the world. Radiation hazards are considerably less significant in open cast mines than in underground mines unless the ore grade is very high. By default therefore the discussion which ensues relates mainly to radiation hazards in underground uranium mines and associated milling operations. The discussion gives a brief outline of typical uranium mine and mining and milling operations. This is followed by a description of the radiation hazards therein and protection measures that are to be taken to minimise radiation exposure. (author)

  4. Handbook for the design, selection, and construction of a rock cover for retired uranium-mill tailings

    International Nuclear Information System (INIS)

    Parker, G.B.

    1982-09-01

    As part of a Nuclear Regulatory Commission (NRC) study to assess the long-term protection of retired uranium mill tailings, the Pacific Northwest Laboratory (PNL) is developing a Handbook to guide the design, selection, and construction of a rock cover (riprap) for decommissioned and reclaimed uranium-mill tailings. The rock cover is designed for long-term protection of mill tailings from wind and water erosion. The purpose of the Handbook is twofold. First, it can be used as a manual by the uranium mill operators for designing, selecting, and constructing a rock cover. Second, the Handbook can be used as a guide to help the NRC evaluate the decommissioning and reclamation plans submitted to them by mill operators. Although the Handbook is not site-specific, it is structured to allow the design of a rock cover for any NRC-licensed tailings impoundment

  5. Restoration of the Nabarlek uranium mine and mill site, Australia

    International Nuclear Information System (INIS)

    Waggitt, P.

    2000-01-01

    The Nabarlek Uranium Mine site is located in northern Australia, about 300 km east of Darwin. The mine operated from 1979 until 1989, at which time the plant was mothballed pending the discovery of a new ore body. In 1994 the Supervising Authorities determined that the facility should be decommissioned and the site rehabilitated, with all site work to be completed by 31 December 1995. The site was dismantled and rehabilitated. These were tasks that presented particular challenges due to the remoteness of the site, the extremes of the climate and the need to meet the requirements of regulators and the traditional landowners. The rehabilitation was assisted by the fact that tailings had been placed directly from the mill into the pit. Contaminated sediments from evaporation ponds, small amounts of process residues, contaminated scrap and other wastes were also contained in the pit at a suitable depth. The final landform was established taking into account the pre-mining landform, the preferred final land use and the need to allow for the erosive forces present in the environment. Radiological conditions were required to meet standards set by the Supervising Authorities in consultation with other stakeholders, including representatives of the traditional landowners. The paper explains how the challenges were overcome at all stages of the process and describes the outcomes to date of post-closure research and monitoring. Particular emphasis is given to radiological issues. The status of the site is currently being assessed for final close-out certification in respect of ecological as well as radiological issues. To date the programme is considered to have been successful. (author)

  6. Geology and hydrology in the vicinity of the inactive uranium mill tailings pile, Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    Purtymun, W.D.; Wienke, C.L.; Dreesen, D.R.

    1977-06-01

    A study was made of the geology and hydrology of the immediate area around a uranium mill at Ambrosia Lake, New Mexico. The mill was in operation from June 1958 through April 1963 and produced 2.7 x 10 9 kg of tailings. The possible environmental consequences of this inactive tailings pile must first be delineated so that stabilization needs and future stabilization success can be properly assessed. The Ambrosia Lake area is underlain by over 1000 m of alternating shales, siltstones, and sandstones that dip gently to the northeast into the San Juan Basin. Water-bearing sandstones make up less than 25 percent of this sedimentary section. Water quality in the sandstones is fair to poor, with total dissolved solids ranging from 500 to 2000 mg/l. The present total volume of tailings is estimated at 1.5 x 10 6 m 3 and ranges in thickness from about 1 to 10 m. The tailings pile is underlain by the Mancos shale which dips to the northeast. The shale is about 120 m thick with three interbedded silty sandstones that are about 9 m in thickness. One of these sandstones outcrops beneath the western part of the pile; the eastern part of the pile is underlain by shale. Ground water in the shales and sandstones beneath the pile is recharged by runoff north of the pile and from three ponds located north, northeast, and east of the pile. The movement of water in shale and sandstones is to the southwest. Secondary recharge to the water in the shales and sandstone is from the basin within the tailings pile. Water in the southeast part of the tailings basin is forming a ground water mound above the underlying sediments. The major transport mechanisms of tailings and possible contaminants from the pile include wind erosion, surface water runoff, movement of ground water beneath the pile, and gaseous diffusion from the pile

  7. Uranium Mill Tailings Remedial Action Program. Annual status report

    International Nuclear Information System (INIS)

    1983-12-01

    The FY 1983 project accomplishments are: completed the Remedial Action Plan and Phase I engineering design for the Canonsburg processing site; completed remedial action on an additional 52 vicinity properties and the inclusion of an additional 303 properties in the Uranium Mill Tailings Remedial Action Project; executed cooperative agreements with four states and the Navajo Nation; published the draft environmental impact statement for Salt Lake City site; and issued the approved Project Plan

  8. Study of the Utah uranium-milling industry. Volume I. A policy analysis

    International Nuclear Information System (INIS)

    Turley, R.E.

    1980-05-01

    This is the first volume of a two volume study of the Utah Uranium Milling Industry. The study was precipitated by a 1977 report issued by the Western Interstate Nuclear Board entitled Policy Recommendations on Financing Stabilization. Perpetual Surveillance and Maintenance of Uranium Mill Tailings. Volume I of this study is a policy analysis or technology assessment of the uranium milling industry in the state of Utah; specifically, the study addresses issues that deal with the perpetual surveillance, monitoring, and maintenance of uranium tailings piles at the end of uranium milling operations, i.e., following shutdown and decommissioning. Volume II of this report serves somewhat as an appendix. It represents a full description of the uranium industry in the state of Utah, including its history and statements regarding its future. The topics covered in volume I are as follows: today's uranium industry in Utah; management of the industry's characteristic nuclear radiation; uranium mill licensing and regulation; state licensing and regulation of uranium mills; forecast of future milling operations; policy needs relative to perpetual surveillance, monitoring, and maintenance of tailings; policy needs relative to perpetual oversight; economic aspects; state revenue from uranium; and summary with conclusions and recommendations. Appendices, figures and tables are also presented

  9. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Riverton, Wyoming. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the Surface Project and the Ground Water Project. At the UMTRA Project site near Riverton, Wyoming, Surface Project cleanup occurred from 1988 to 1990. Tailings and radioactively contaminated soils and materials were taken from the Riverton site to a disposal cell in the Gas Hills area, about 60 road miles (100 kilometers) to the east. The surface cleanup reduces radon and other radiation emissions and minimizes further ground water contamination. The UMTRA Project`s second phase, the Ground Water Project, will evaluate the nature and extent of ground water contamination at the Riverton site that has resulted from the uranium ore processing activities. Such evaluations are used at each site to determine a strategy for complying with UMTRA ground water standards established by the US Environmental Protection Agency (EPA) and if human health risks could result from exposure to ground water contaminated by uranium ore processing. Exposure could hypothetically occur if drinking water were pumped from a well drilled in an area where ground water contamination might have occurred. Human health and environmental risks may also result if people, plants, or animals are exposed to surface water that has mixed with contaminated ground water.

  10. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Riverton, Wyoming. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the Surface Project and the Ground Water Project. At the UMTRA Project site near Riverton, Wyoming, Surface Project cleanup occurred from 1988 to 1990. Tailings and radioactively contaminated soils and materials were taken from the Riverton site to a disposal cell in the Gas Hills area, about 60 road miles (100 kilometers) to the east. The surface cleanup reduces radon and other radiation emissions and minimizes further ground water contamination. The UMTRA Project's second phase, the Ground Water Project, will evaluate the nature and extent of ground water contamination at the Riverton site that has resulted from the uranium ore processing activities. Such evaluations are used at each site to determine a strategy for complying with UMTRA ground water standards established by the US Environmental Protection Agency (EPA) and if human health risks could result from exposure to ground water contaminated by uranium ore processing. Exposure could hypothetically occur if drinking water were pumped from a well drilled in an area where ground water contamination might have occurred. Human health and environmental risks may also result if people, plants, or animals are exposed to surface water that has mixed with contaminated ground water

  11. Environmental impact of uranium mining and milling in Australia

    International Nuclear Information System (INIS)

    Levins, D.M.

    1980-01-01

    Australia has almost twenty per cent of the Western World's low-cost uranium reserves, located mostly in the Alligator Rivers region of the Northern Territory. At present, only one uranium mill is operating in Australia, but a number of new mills are planned for the early 1980s. Details are given of Australian uranium mining and milling proposals and the measures taken to minimize their environmental impact. Major factors affecting environmental impact are discussed, including treatment of liquid wastes, water management, control of radon and other airborne releases, and disposal of tailings. (auth)

  12. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS).

  13. Environmental assessment of remedial action at the Maybell uranium mill tailings site near Maybell, Colorado: Revision 2

    International Nuclear Information System (INIS)

    1994-11-01

    The purpose of this environmental assessment (EA) is to evaluate the environmental impacts resulting from remedial action at the Maybell uranium mill tailings site near Maybell, Colorado. A biological assessment and a floodplain/wetlands assessment are included as part of this EA. This report and attachments describe the proposed action, affected environment, and environmental impacts associated with the proposed remedial action, including impacts to threatened and endangered species listed or proposed for listing by the US Fish and Wildlife Service (FWS)

  14. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2

    International Nuclear Information System (INIS)

    1996-02-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment. Human health risk may result from exposure to ground water contaminated from uranium ore processing. Exposure could occur from drinking water obtained from a well placed in the areas of contamination. Furthermore, environmental risk may result from plant or animal exposure to surface water and sediment that have received contaminated ground water

  15. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Sites near Rifle, Colorado. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to prevent further ground water contamination. The Ground Water Project evaluates the nature and extent of ground water contamination resulting from the uranium ore processing activities. Two UMTRA Project sites are near Rifle, Colorado: the Old Rifle site and the New Rifle site. Surface cleanup at the two sites is under way and is scheduled for completion in 1996. The Ground Water Project is in its beginning stages. A risk assessment identifies a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the environment may be exposed, and the health or environmental effects that could result from that exposure. This report is a site-specific document that will be used to evaluate current and future impacts to the public and the environment from exposure to contaminated ground water. This evaluation and further site characterization will be used to determine if action is needed to protect human health or the environment. Human health risk may result from exposure to ground water contaminated from uranium ore processing. Exposure could occur from drinking water obtained from a well placed in the areas of contamination. Furthermore, environmental risk may result from plant or animal exposure to surface water and sediment that have received contaminated ground water.

  16. Plans for environmental restoration of uranium mining and milling sites in Bulgaria

    International Nuclear Information System (INIS)

    Nedyalkov, K.

    1997-01-01

    In 1992, uranium mining and milling industry in Bulgaria was closed down by Decree No. 163 of the Council of Ministers of the Republic of Bulgaria which defined the procedure for development of liquidation plans, their approval and the procedure for funding from the national budget. The 1994 Decree No. 56 of the Council of Ministers assigned the organization of the liquidation and rehabilitation activities to the Committee of Energy (later, in 1996, transformed to the Ministry of Energy and Energy Resources). An Interdepartmental Board of Experts including representatives of all concerned ministries and agencies was established to coordinate the above activities and to approve work plans. The main stages of liquidation of the uranium industry and its after-effects were defined as follows: (1) environmental status (maintenance of a minimized service mode in order to preserve the state of the site- environment system); (2) technical liquidation; (3) technical recultivation; (4) biological recultivation; (5) purification of contaminated waters; and (6) monitoring. In 1992 and 1993, preparation for the above activities was carried out by development of detailed preliminary studies and work plans for the first stage - the stage of technical liquidation. Their implementation was launched by evacuation of mining and drilling machinery, haulage and processing of finished products etc. (author)

  17. Bridging the gap between tribal risk perceptions and scientific decision-making for uranium legacy sites located in Native American communities

    Science.gov (United States)

    Joseph, C.; Waugh, W.; Glenn, E.; Chief, K.

    2017-12-01

    There are approximately 15,000 abandoned uranium mines (AUM) in the western United States, of which 500 AUMs are located in the Colorado Plateau Four-Corners region. Uranium mill tailings, referred to as legacy waste, compromise the largest volume of any category of radioactive waste in the nation. Today, the Department of Energy Legacy Management is responsible for long-term stewardship and maintenance of inactive uranium processing sites that have been remediated to prevent further migration and exposure of tailings to the environment and surrounding communities. In collaboration with the DOE-LM, I am investigating the impact of climate change and community adaptation on the long-term performance of disposal cell covers for uranium mill tailings located in Native American communities, as well as how these communities have adapted to and perceive these areas. I am interested in how abiotic engineered cell covers may be candidate sites for future conversion to vegetated evapotranspirative caps for arid to semi-arid climates. The objectives are to: 1) assess above-ground tissue of plants encroaching engineered cell covers for concentrations of uranium, radium, selenium, molybdenum, thorium, arsenic, lead, and manganese and compare them to control sites; 2) determine if above-cell plant tissue is accumulating to toxic levels that may create an exposure pathway, 3) identify climate scenarios for site locations and determine how short-and long-scale climate projections will influence spatial and temporal plant distribution for specific woody species; and 4) evaluate the risk perceptions of Hopi villages located five miles downstream of one site location. To date, risk perception and stakeholder outreach to the Hopi communities has been absent. This study will help inform how land use, water use, and sustenance practices may contribute to environmental health disparities for one of the few tribes that has maintained physical continuity within their ancestral homeland.

  18. Remedial actions at the former Climax Uranium Company, Uranium Mill site, Grand Junction, Mesa County, Colorado. Volume 1, Text: Final environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    None

    1986-12-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. This statement is also intended to aid the BLM in amending their management framework plans and final resource management plan, as well as assisting in compliance with the withdrawal application as appropriate. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. The tailings were produced by the former Climax Uranium Company which processed uranium ore, which it sold to the US Atomic Energy Commission from 1951 to 1966 and to private sources from 1966 to 1970. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: (1) No action. (2) Stabilization at the Grand Junction site. (3) Disposal at the Cheney Reservoir site with truck transport. (4) Disposal at the Cheney Reservoir site with train and truck transport. (5) Disposal at the Two Road site with truck transport. (6) Disposal at the Two Road site with train and truck transport. All of the alternatives except no action include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE`s preferred alternative.

  19. Uranium mill tailings

    International Nuclear Information System (INIS)

    McLaren, L.H.

    1982-11-01

    This bibliography contains information on uranium mill tailings included in the Department of Energy's Energy Data Base from January 1981 through October 1982. The abstracts are grouped by subject category as shown in the table of contents. Entries in the subject index also facilitate access by subject, e.g., Mill Tailings/Radiation Hazards. Within each category the arrangement is by report number for reports, followed by nonreports in reverse chronological order. These citations are to research reports, journal articles, books, patents, theses, and conference papers from worldwide sources. Five indexes, each preceded by a brief description, are provided: Corporate Author, Personal Author, Subject, Contract Number, and Report Number. (335 abstracts)

  20. The Canadian Nuclear Safety Commission Compliance Program for Uranium Mines and Mills

    Energy Technology Data Exchange (ETDEWEB)

    Schryer, D., E-mail: denis.schryer@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Saskatoon, Saskatchewan (Canada)

    2014-05-15

    The Canadian Nuclear Safety Commission (CNSC) is the principal nuclear regulator in Canada. The CNSC is empowered through the Nuclear Safety and Control Act (NSCA) and its associated regulations, to regulate the entire nuclear cycle which includes: uranium mining and milling, uranium refining and processing, fuel fabrication, power generation and nuclear waste management. A CNSC uranium mine licence is required by a proponent to site, prepare, construct, operate, decommission and abandon this nuclear facility. The CNSC licence is the legal instrument that authorizes the regulated activities and incorporates conditions and regulatory controls. Following a favourable Commission Tribunal decision to issue a licence to authorize the licensed activities, CNSC develops and executes a compliance plan of the licensee’s programs and procedures. The CNSC compliance plan is risk-informed and applies its resources to the identified higher risk areas. The compliance program is designed to encourage compliance by integrating three components: promotion, verification and enforcement and articulates the CNSC expectations to attain and maintain compliance with its regulatory requirements. The licensee performance is assessed through compliance activities and reported to the Commission to inform the licensing process during licence renewal. The application of the ongoing compliance assessment and risk management model ensures that deviations from impact predictions are addressed in a timely manner. The Uranium Mines and Mills Division of the CNSC are preparing to meet the challenges of the planned expansion of their Canadian uranium mining industry. The presentation will discuss these challenges and the measures required to address them. The Uranium Mines and Mills Division (UMMD) have adopted a structured compliance framework which includes formal procedures to conduct site inspections. New UMMD staff are trained to apply the regulations to licensed sites and to manage non

  1. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase 1) and the Ground Water Project (phase 2). For the UMTRA Project site located near Green River, Utah, the Surface Project cleanup occurred from 1988 to 1989. The tailings and radioactively contaminated soils and materials were removed from their original locations and placed into a disposal cell on the site. The disposal cell is designed to minimize radiation emissions and minimize further contamination of ground water beneath the site. The UMTRA Project`s second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. For the Green River site, the risk assessment helps determine whether human health risks result from exposure to ground water contaminated by uranium processing. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Green River site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards.

  2. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Green River, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (phase 1) and the Ground Water Project (phase 2). For the UMTRA Project site located near Green River, Utah, the Surface Project cleanup occurred from 1988 to 1989. The tailings and radioactively contaminated soils and materials were removed from their original locations and placed into a disposal cell on the site. The disposal cell is designed to minimize radiation emissions and minimize further contamination of ground water beneath the site. The UMTRA Project's second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. For the Green River site, the risk assessment helps determine whether human health risks result from exposure to ground water contaminated by uranium processing. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Green River site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards

  3. Uranium mill tailings storage, use, and disposal problems

    International Nuclear Information System (INIS)

    Hendricks, D.W.

    1977-01-01

    Solid and liquid residues (tailings) containing substantial quantities of naturally occurring radionuclides are produced and stored at all US uranium mill sites. These radioactive wastes are a potential health hazard with the degree of hazard depending largely on the tailings management practices at the individual sites. The principal pathways of potential radiation exposure to man are discussed. A description is presented of some past and current tailings storage practices together with a description of some of the possible problems associated with various stabilization and disposal options. 16 figures

  4. Current practices for the management and confinement of uranium mill tailings

    International Nuclear Information System (INIS)

    1992-01-01

    This report discusses the current practices used in the design siting, construction and closeout of impoundment facilities for uranium mill tailings. The objective is to present an integrated overview of the technological, safety and radiation protection aspects of these topics in order to ensure that the potential radiological and non-radiological risks associated with the management of uranium mill tailings are minimized now and in the future. The report: identifies the nature and source of radioactive and non-radioactive pollutants in uranium mill tailings; identifies the important mechanisms by which pollutants can be released from the tailings impoundment; reviews radiation protection aspects of these mechanisms; describes the pathways by which the pollutants may reach humans; describes some of the site selection and design options and considerations for final stabilization and rehabilitation of tailings impoundments; describes the methods of assessing closure strategies; describes long term responsibilities for tailings management and financial assurance to ensure these responsibilities; and reviews the magnitude and probability of occurrence of the hazards arising, with the aim of ensuring that the risks presented are acceptable. Because of the complexity of the pollutant release mechanisms and the site specific nature of the design and management controls that can be used, it is not possible for a report of this nature to be either exhaustive or detailed in all respects. The methods of confinement employed for any particular tailings impoundment will depend on the country, its climate, demography and its site specific performance criteria which should be defined by the relevant competent authorities. Both operating and post-operating conditions are considered. After shutdown of the mill and stabilization of the tailings, continuing surveillance and maintenance should be considered until the integrity and durability of the tailings impoundment have been

  5. Annual report on the U.S. Department of Energy's Cultural Resource Activities at Colorado UMTRA Project Sites for October 1993 through September 1994

    International Nuclear Information System (INIS)

    1994-11-01

    This report summarizes the results of cultural resource activities conducted by the U.S. Department of Energy (DOE) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites in Colorado for the period of October 1, 1993, through September 30, 1994. The UMTRA Project is a cooperative (state and federal) program mandated by the Uranium Mill Tailings Radiation Control Act, Public Law 95-604 (42 USC section 7901 et seq.). This law requires the timely cleanup of 24 inactive uranium mill tailings sites throughout the United States. Nine of these inactive uranium mill tailings sites are in Colorado at Durango, Grand Junction, Gunnison, Maybell, Naturita, Rifle, and Slick Rock. On December 6, 1984, the DOE, Advisory Council on Historic Preservation, and Colorado State Historic Preservation Officer (SHPO) entered into a programmatic memorandum of agreement (PMOA) (DOE, 1984). This PMOA specifies requirements for the DOE's fulfillment of its obligations under various state and federal regulations for the protection and preservation of cultural resources. This report fulfills the requirement for the DOE to provide the state of Colorado with an annual report on the cultural resource activities performed for all of the UMTRA Project sites in Colorado. This report is organized by UMTRA Project site. For each site, the general remedial action activities and cultural resource activities performed during the period of record are summarized. When known, the DOE's plans for future cultural resource activities at the site are summarized

  6. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project, and the Ground Water Project. For the UMTRA Project site located near Naturita, Colorado, phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation`s Upper Burbank Repository at Uravan, Colorado. The surface cleanup will reduce radon and other radiation emissions from the former uranium processing site and prevent further site-related contamination of ground water. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health and the environment, and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water or surface water that has mixed with contaminated ground water. Therefore, a risk assessment was conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment.

  7. Baseline risk assessment of ground water contamination at the Uranium Mill Tailings Site near Naturita, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1995-11-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project, and the Ground Water Project. For the UMTRA Project site located near Naturita, Colorado, phase I involves the removal of radioactively contaminated soils and materials and their transportation to a disposal site at Union Carbide Corporation's Upper Burbank Repository at Uravan, Colorado. The surface cleanup will reduce radon and other radiation emissions from the former uranium processing site and prevent further site-related contamination of ground water. Phase II of the project will evaluate the nature and extent of ground water contamination resulting from uranium processing and its effect on human health and the environment, and will determine site-specific ground water compliance strategies in accordance with the US Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. Human health risks could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. Environmental risks may result if plants or animals are exposed to contaminated ground water or surface water that has mixed with contaminated ground water. Therefore, a risk assessment was conducted for the Naturita site. This risk assessment report is the first site-specific document prepared for the Ground Water Project at the Naturita site. What follows is an evaluation of current and possible future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will be used to determine whether any action is needed to protect human health or the environment

  8. Jaduguda uranium mill : rich experiences for future challenges

    International Nuclear Information System (INIS)

    Beri, K.K.

    1991-01-01

    India's only uranium milling plant at Jaduguda was commissioned in 1967-68 utilising low grade uranium ore. The flowsheet of the mill and controlling parameters were based on studies done on laboratory and pilot plant scale tests at the Bhabha Atomic Research Centre, Bombay. The mill has worked upto expectation except in few areas where modifications had to be done for smooth production. Apart from this improvements in operating practices have been done based on experience gained in operating the mill, incorporating the recent technological advances. In the recent past, the mill was expanded to increase the installed capacity by 40% and was commissioned in October 1987. The expanded mill has given the desired capacity and is working smoothly. The present paper deals with the experience gained in running the plant for the last 20 years and changes incorporated (author). 4 figs

  9. Descriptive documentation for New Mexico uranium milling model

    International Nuclear Information System (INIS)

    Bonem, G.; Livevano, R.J.

    1981-01-01

    The New Mexico Uranium Milling Model is a linear programming model. It can demonstrate how cost minimizing management can reduce the costs of milling uranium subject to a series of environmental, resource, and technological constraints. For example, if 15,000 tons were the targeted level of milling output, the model would provide the minimum cost of this production level, given certain levels of environmental, fuel, water, and technological constraints. The model was developed to allow state policymakers to assess the uranium industry from various standpoints. Through the use of the model, state policymakers can determine the effects of air and water discharge standards and limited capital availability on: milling costs of production; uses of electricity, fuel, and water; and levels of air and water emissions. The model covers the following: process technologies which are acid leach and carbonate leach; raw materials mix; air and water discharges; residual treatment process; and plant types

  10. Mortality patterns among a retrospective cohort of uranium mill workers

    International Nuclear Information System (INIS)

    Waxweiler, R.J.; Archer, V.E.; Roscoe, R.J.; Watanabe, A.; Thun, M.J.

    1983-01-01

    The long-term health effects associated with the milling of uranium ore are of interest particularly because of exposures to uranium and thorium-230. Excess risks of pulmonary and lymphatic malignancies have been suggested by previous epdiemiologic studies of persons milling or smelting uranium ores, and nephrotoxic effects of uranium have been reported in both man and animals. To test these three previously reported associations and to assess all cause-specific mortality patterns among uranium mill workers, we carried out a retrospective cohort study of 2002 uranium millers employed in any of seven mills at least one year before 1972. Ninety-eight percent (98%) followup of the cohort through 1977 resulted in 533 deaths observed versus 605 expected from US White male mortality rates. Mortality from most causes was lower than expected. Significant excess risks were found only for nonmalignant respiratory disease and miscellaneous accidents but not for any of the three diseases of a priori interest. However, nonsignificant excesses were found for lymphatic malignancies after 20 years latency and for death due to chronic nephritis among short-term workers

  11. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Lakeview, Oregon. Revision 1

    International Nuclear Information System (INIS)

    1995-12-01

    Surface cleanup at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Lakeview, Oregon was completed in 1989. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment

  12. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Lakeview, Oregon. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    Surface cleanup at the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Lakeview, Oregon was completed in 1989. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Ecological risks to plants or animals may result from exposure to surface water and sediment that have received contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site characterization will determine whether any action is needed to protect human health or the ecological environment.

  13. Remedial action plan for the inactive uranium processing site at Naturita, Colorado. DOE responses to comments from U.S. Nuclear Regulatory Commission and Colorado Department of Public Health and Environment

    International Nuclear Information System (INIS)

    1998-01-01

    This report contains responses by the US Department of Energy to comments from the US Nuclear Regulatory Commission and the Colorado Department of Public Health and Environment on the Naturita remedial action plan. This was done in an attempt to clarify information. The site is an inactive uranium processing site at Naturita, Colorado

  14. Management of wastes containing radioactivity from mining and milling uranium ores in Northern Australia

    International Nuclear Information System (INIS)

    Costello, J.M.

    1977-01-01

    The procedures and controls to achieve safe management of wastes containing radioactivity during the mining and processing of uranium ores are mainly site-specific depending on the nature, location and distribution of the ore and gangue material. Waste rock and below-ore-grade material containing low levels of radioactivity require disposal at the mine site. In open-cut mining the material is generally stockpiled above ground, with revegetation and collection of run-off water. Some material may be used to backfill open cuts. Management of these wastes requires a thorough investigation of groundwater hydrology and surface soil characteristics to control dissipation of radioactive material. Dust containing radon and radioactive particulate is produced during ore milling, and dusts of ore concentrate are generated during calcination and packaging of the yellowcake product. These dusts are managed by ventilation and filtration systems; working conditions and discharges to atmosphere will be according to the Australian Code of Practice on Radiation Protection during Mining and Milling of Uranium Ores. The chemical waste stream from leaching and processing of the uranium ores contains most of the radioactivity resulting from radium and its decay products. Neutralized effluent is discharged into holding ponds for settling solids. The paper describes the nature of wastes containing radioactivity resulting from the mining and milling of uranium, and illustrates modern engineering practices and monitoring procedures to manage the wastes, as described in the Environmental Impact Statement produced by Ranger Uranium Mines Pty Ltd (RUM) for public hearings. (author)

  15. Predicting radon flux from uranium mill tailings

    International Nuclear Information System (INIS)

    Freeman, H.D.; Hartley, J.N.

    1983-11-01

    Pacific Northwest Laboratory (PNL), under contract to the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP) office, is developing technology for the design of radon barriers for uranium mill tailings piles. To properly design a radon cover for a particular tailings pile, the radon flux emanating from the bare tailings must be known. The tailings characteristics required to calculate the radon flux include radium-226 content, emanating power, bulk density, and radon diffusivity. This paper presents theoretical and practical aspects of estimating the radon flux from an uranium tailings pile. Results of field measurements to verify the calculation methodology are also discussed. 24 references, 4 figures, 4 tables

  16. Assessment of a Hydroxyapatite Permeable Reactive Barrier to Remediate Uranium at the Old Rifle Site Colorado

    International Nuclear Information System (INIS)

    Moore, Robert C.; Szecsody, James; Rigali, Mark J.; Vermuel, Vince; Leullen, Jon

    2016-01-01

    We have performed an initial evaluation and testing program to assess the effectiveness of a hydroxyapatite (Ca10(PO4)6(OH)2) permeable reactive barrier and source area treatment to decrease uranium mobility at the Department of Energy (DOE) former Old Rifle uranium mill processing site in Rifle, western Colorado. Uranium ore was processed at the site from the 1940s to the 1970s. The mill facilities at the site as well as the uranium mill tailings previously stored there have all been removed. Groundwater in the alluvial aquifer beneath the site still contains elevated concentrations of uranium, and is currently used for field tests to study uranium behavior in groundwater and investigate potential uranium remediation technologies. The technology investigated in this work is based on in situ formation of apatite in sediment to create a subsurface apatite PRB and also for source area treatment. The process is based on injecting a solution containing calcium citrate and sodium into the subsurface for constructing the PRB within the uranium plume. As the indigenous sediment micro-organisms biodegrade the injected citrate, the calcium is released and reacts with the phosphate to form hydroxyapatite (precipitate). This paper reports on proof-of-principle column tests with Old Rifle sediment and synthetic groundwater.

  17. Assessment of a Hydroxyapatite Permeable Reactive Barrier to Remediate Uranium at the Old Rifle Site Colorado.

    Energy Technology Data Exchange (ETDEWEB)

    Moore, Robert C.; Szecsody, James (PNNL); Rigali, Mark J.; Vermuel, Vince (PNNL); Leullen, Jon (AECOM)

    2016-02-01

    We have performed an initial evaluation and testing program to assess the effectiveness of a hydroxyapatite (Ca10(PO4)6(OH)2) permeable reactive barrier and source area treatment to decrease uranium mobility at the Department of Energy (DOE) former Old Rifle uranium mill processing site in Rifle, western Colorado. Uranium ore was processed at the site from the 1940s to the 1970s. The mill facilities at the site as well as the uranium mill tailings previously stored there have all been removed. Groundwater in the alluvial aquifer beneath the site still contains elevated concentrations of uranium, and is currently used for field tests to study uranium behavior in groundwater and investigate potential uranium remediation technologies. The technology investigated in this work is based on in situ formation of apatite in sediment to create a subsurface apatite PRB and also for source area treatment. The process is based on injecting a solution containing calcium citrate and sodium into the subsurface for constructing the PRB within the uranium plume. As the indigenous sediment micro-organisms biodegrade the injected citrate, the calcium is released and reacts with the phosphate to form hydroxyapatite (precipitate). This paper reports on proof-of-principle column tests with Old Rifle sediment and synthetic groundwater.

  18. Biogeochemical aspects of uranium mineralization, mining, milling, and remediation

    Science.gov (United States)

    Campbell, Kate M.; Gallegos, Tanya J.; Landa, Edward R.

    2015-01-01

    Natural uranium (U) occurs as a mixture of three radioactive isotopes: 238U, 235U, and 234U. Only 235U is fissionable and makes up about 0.7% of natural U, while 238U is overwhelmingly the most abundant at greater than 99% of the total mass of U. Prior to the 1940s, U was predominantly used as a coloring agent, and U-bearing ores were mined mainly for their radium (Ra) and/or vanadium (V) content; the bulk of the U was discarded with the tailings (Finch et al., 1972). Once nuclear fission was discovered, the economic importance of U increased greatly. The mining and milling of U-bearing ores is the first step in the nuclear fuel cycle, and the contact of residual waste with natural water is a potential source of contamination of U and associated elements to the environment. Uranium is mined by three basic methods: surface (open pit), underground, and solution mining (in situ leaching or in situ recovery), depending on the deposit grade, size, location, geology and economic considerations (Abdelouas, 2006). Solid wastes at U mill tailings (UMT) sites can include both standard tailings (i.e., leached ore rock residues) and solids generated on site by waste treatment processes. The latter can include sludge or “mud” from neutralization of acidic mine/mill effluents, containing Fe and a range of coprecipitated constituents, or barium sulfate precipitates that selectively remove Ra (e.g., Carvalho et al., 2007). In this chapter, we review the hydrometallurgical processes by which U is extracted from ore, the biogeochemical processes that can affect the fate and transport of U and associated elements in the environment, and possible remediation strategies for site closure and aquifer restoration.This paper represents the fourth in a series of review papers from the U.S. Geological Survey (USGS) on geochemical aspects of UMT management that span more than three decades. The first paper (Landa, 1980) in this series is a primer on the nature of tailings and radionuclide

  19. Radiological health aspects of uranium milling

    International Nuclear Information System (INIS)

    Fisher, D.R.; Stoetzel, G.A.

    1983-05-01

    This report describes the operation of conventional and unconventional uranium milling processes, the potential for occupational exposure to ionizing radiation at the mill, methods for radiological safety, methods of evaluating occupational radiation exposures, and current government regulations for protecting workers and ensuring that standards for radiation protection are adhered to. In addition, a survey of current radiological health practices is summarized

  20. Radiological health aspects of uranium milling

    Energy Technology Data Exchange (ETDEWEB)

    Fisher, D.R.; Stoetzel, G.A.

    1983-05-01

    This report describes the operation of conventional and unconventional uranium milling processes, the potential for occupational exposure to ionizing radiation at the mill, methods for radiological safety, methods of evaluating occupational radiation exposures, and current government regulations for protecting workers and ensuring that standards for radiation protection are adhered to. In addition, a survey of current radiological health practices is summarized.

  1. Conclusions and recommendations of the SCOPE-RADSITE workshop on remediation achievements after uranium mining and milling

    International Nuclear Information System (INIS)

    Vandenhove, H.; Vandecasteele, C.M.; Collard, G.

    2002-01-01

    The SCOPE-RADSITE Project provides a unique international scientific forum where the radioactive wastes generated in the development of nuclear weapons, including their potential impact on the environment and human populations, are studied and reviewed. At the present SCOPE-RADSITE workshop a team of experts presented the current status of uranium mining and milling operations in the United States, in the former Soviet Union (FSU) and in Central and Eastern Europe. The effect of radiocontaminants resulting from the uranium mining and milling operations to species other than humans and the combined effects of environmental radiation and other agents were discussed. Finally, three cases of remediation projects were presented: remediation at COGEMA sites in France, the WISMUT rehabilitation project in Germany and uranium mine reclamation in Texas and remediation achievements were described. Finally the workshop discussed important issues and recommendations to be considered when approaching remediation of past legacies resulting from uranium mining and milling. (author)

  2. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards.

  3. Baseline risk assessment of ground water contamination at the Monument Valley uranium mill tailings site Cane Valley, Arizona

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project consists of the Surface Project (Phase I) and the Ground Water Project (Phase II). Under the UMTRA Surface Project, tailings, radioactive contaminated soil, equipment, and materials associated with the former uranium ore processing at UMTRA Project sites are placed into disposal cells. The cells are designed to reduce radon and other radiation emissions and to minimize further contamination of ground water. Surface cleanup at the Monument Valley UMTRA Project site near Cane Valley, Arizona, was completed in 1994. The Ground Water Project evaluates the nature and extent of ground water contamination that resulted from the uranium ore processing activities. The Ground Water Project is in its beginning stages. Human health may be at risk from exposure to ground water contaminated by uranium ore processing. Exposure could occur by drinking water pumped out of a hypothetical well drilled in the contaminated areas. Adverse ecological and agricultural effects may also result from exposure to contaminated ground water. For example, livestock should not be watered with contaminated ground water. A risk assessment describes a source of contamination, how that contamination reaches people and the environment, the amount of contamination to which people or the ecological environment may be exposed, and the health or ecological effects that could result from that exposure. This risk assessment is a site-specific document that will be used to evaluate current and potential future impacts to the public and the environment from exposure to contaminated ground water. The results of this evaluation and further site investigations will be used to determine a compliance strategy to comply with the UMTRA ground water standards

  4. Mineralogy and geochemistry of uranium mill tailings

    International Nuclear Information System (INIS)

    Pagel, M.; Somot, S.

    2002-01-01

    We have investigated three main types of uranium mill tailings: (1) acid mill tailings (Mounana, Gabon), (2) neutralized acid mill tailings (Ecarpiere and Jouac, France) and (3) alkaline mill tailings (Lodeve, France). We have focused especially on radium behaviour which is of major environmental concern in these tailings, but other metals were also studied. It is shown that in type 1 , trapping of 226 Ra by anglesite and barite is dominant whereas in types 2 and 3, 226 Ra is mainly or significantly scavenged by Fe- Mn oxyhydroxides. This study points out the importance of keeping conditions in which these oxyhydroxides will be stable for the long-term. Uranium would be also released during acidification of the tailings. This shows the importance to know more about the behavior of Ra during the crystallization of oxyhydroxides and during tailings diagenesis. Therefore, it is very important to study the sorption of Ra by clay minerals or late authigeneous minerals such as barite. (author)

  5. Surface water contamination by uranium Mining/Milling activities in Northern guangdong province, China

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jin; Song, Gang; Chen, Yongheng; Zhu, Li [Key Laboratory of Waters Safety and Protection in the Pearl River Delta, Ministry of Education, Guangzhou University, Guangzhou (China); Liu, Juan [Key Laboratory of Waters Safety and Protection in the Pearl River Delta, Ministry of Education, Guangzhou University, Guangzhou (China); Department of Geosciences, National Taiwan University, Taipei (China); Li, Hongchun [Department of Geosciences, National Taiwan University, Taipei (China); Xiao, Tangfu [State Key Laboratory of Environmental Geochemistry, Institute of Geochemistry, Chinese Academy of Sciences, Guiyang (China); Qi, Jianying [South China Institute of Environmental Science, Ministry of Environmental Protection, Guangzhou (China)

    2012-12-15

    The northern region of Guangdong Province, China, has suffered from the extensive mining/milling of uranium for several decades. In this study, surface waters in the region were analyzed by inductively coupled plasma optical emission spectrometry (ICP-OES) for the concentrations of uranium (U), thorium (Th), and non-radioactive metals (Fe, Mn, Mg, Li, Co, Cu, Ni, and Zn). Results showed highly elevated concentrations of the studied radionuclides and metals in the discharged effluents and the tailing seepage of the U mining/milling sites. Radionuclide and heavy metal concentrations were also observed to be overall enhanced in the recipient stream that collected the discharged effluents from the industrial site, compared to the control streams, and rivers with no impacts from the U mining/milling sites. They displayed significant spatial variations and a general decrease downstream away from upper point-source discharges of the industrial site. In addition, obvious positive correlations were found between U and Th, Fe, Zn, Li, and Co (R{sup 2} > 0.93, n = 28) in the studied water samples, which suggest for an identical source and transport pathway of these elements. In combination with present surface water chemistry and chemical compositions of uraniferous minerals, the elevation of the analyzed elements in the recipient stream most likely arose from the liquid effluents, processing water, and acid drainage from the U mining/milling facilities. The dispersion of radionuclides and hazardous metals is actually limited to a small area at present, but some potential risk should not be negligible for local ecosystem. The results indicate that environmental remediation work is required to implement and future cleaner production technology should be oriented to avoid wide dispersion of radioactivity and non-radioactive hazards in U mining/milling sites. (Copyright copyright 2012 WILEY-VCH Verlag GmbH and Co. KGaA, Weinheim)

  6. Several issues on the decommissioning of uranium mining/milling facilities

    International Nuclear Information System (INIS)

    Xu Lechang; Xu Jianxin; Gao Shangxiong

    2007-01-01

    Several issues on the decommissioning of uranium mining/milling facilities are discussed at the national and international level of decommissioning, including radiation, monitoring, dose evaluation, covering, water treatment and stabilization of uranium tailings impoundment, etc. Some suggestions are made: drawing international lessons on decommissioning of uranium mining/milling facilities; enhancing monitoring and database construction in decommissioning management; stressing utilization of measured dose data; using the experience of other countries for reference on covering designs for uranium tailings impoundment and water treatment; strengthening decommissioning management, etc. (authors)

  7. Geomorphological assessment of sites and impoundments for the long term containment of uranium mill tailings in the Alligator Rivers Region

    International Nuclear Information System (INIS)

    East, T.J.

    1986-01-01

    This paper presents a program of current and future research into those geomorphological processes likely to affect the long term containment of uranium mill tailings in the Alligator Rivers Region of the Northern Territory. Research is directed at three main areas: identification of geomorphic hazards at proposed impoundment sites; determination of erosion rates on impoundment slopes; and prediction of patterns of fluvial dispersal of released tailings. Each necessitates consideration of present and future geomorphic processes

  8. Management of wastes containing radioactivity from mining and milling of uranium ores in Northern Australia

    International Nuclear Information System (INIS)

    Costello, J.M.

    1977-01-01

    The procedures and controls to achieve safe management of wastes containing radioactivity during the mining and processing of uranium ores are mainly site specific depending on the nature, location and distribution of the ore and gangue material. Waste rock and below-ore-grade material containing low levels of radioactivity require disposal at the mine site. In open cut mining the material is generally stockpiled above ground, with revegetation and collection of run-off water. Some material may be used to backfill open cuts. Management of these wastes requires a thorough investigation of ground water hydrology and surface soil characteristics to control dissipation of radioactive material. Dust containing radon and radioactive particulate is produced during ore milling, and dusts of ore concentrate are generated during calcination and packaging of the yellowcake product. These dusts are managed by ventilation and filtration systems, working conditions, and discharges to atmosphere will be according to the Australian Code of Practice on Radiation Protection during Mining and Milling of Uranium Ores. The chemical waste stream from leaching and processing of the uranium ores contains the majority of the radioactivity resulting from radium and its decay products. Neutralised effluent is discharged into holding ponds for settling of solids. This paper describes the nature of wastes containing radioactivity resulting from the mining and milling of uranium, and illustrates modern engineering practices and monitoring procedures to manage the wastes, as described in the Environmental Impact statement produced by Ranger Uranium Mines Proprietary Limited for public hearings

  9. Thermal stabilization of uranium mill tailings

    International Nuclear Information System (INIS)

    Dreesen, D.R.; Williams, J.M.; Cokal, E.J.

    1981-01-01

    The sintering of tailings at high temperatures (1200 0 C) has shown promise as a conditioning approach that greatly reduces the 222 Rn emanation of uranium mill tailings. The structure of thermally stabilized tailings has been appreciably altered producing a material that will have minimal management requirements and will be applicable to on-site processing and disposal. The mineralogy of untreated tailings is presented to define the structure of the original materials. Quartz predominates in most tailings samples; however, appreciable quantities of gypsum, clay, illite, or albites are found in some tailings. Samples from the Durango and Shiprock sites have plagioclase-type aluminosilicates and non-aluminum silicates as major components. The iron-rich vanadium tailings from the Salt Lake City site contain appreciable quantities of α-hematite and chloroapatite. The reduction in radon emanation power and changes in mineralogy as a function of sintering temperature are presented

  10. Uranium ore mill at Dolni Rozinka: 40 years of operation

    International Nuclear Information System (INIS)

    Toman, F.; Jezova, V.

    2007-01-01

    Uranium ore mined in the Rozna deposit is treated at a chemical treatment plant (a mill) situated in the close vicinity of the Rozna mine. In the mill, uranium is extracted from the crushed and ground-up ore by alkaline leaching. Uranium is then recovered from the solution by sorption on ion exchange resin; the next steps are precipitation and drying. Alkaline leaching is applied at the atmospheric pressure and the temperature of 80 deg C; the recovery factor is moving around 93%. The final product of the milling is uranium concentrate, ammonium diuranate (NH 4 ) 2 U 2 O 7 ), a so-called 'yellow cake' which is treated into a fuel for nuclear power plants in conversion facilities abroad. The milling is carried on under the condition of the closed cycle of technology water. Due to the positive annual precipitation balance, the over balance of technology water in tailings pond has to be purified before discharging into a river. Evaporation and membrane processes (electrodialysis and reverse osmosis) are used to purify the water. The mill at Dolni Rozinka has been in operation since 1968. It has processed 13.2 million tons of uranium ore which is about 14000 tons of uranium and purified more than 6 million m 3 of the over balanced technology water during 40 years. From the organizational point of view, the mine and the chemical treatment plant form the branch plant GEAM, which is a part of the state enterprise DIAMO. (author)

  11. Environmental factors affecting long-term stabilization of radon suppression covers for uranium mill tailings

    International Nuclear Information System (INIS)

    Young, J.K.; Long, L.W.; Reis, J.W.

    1982-04-01

    Pacific Northwest Laboratory is investigating the use of a rock armoring blanket (riprap) to mitigate wind and water erosion of an earthen radon suppression cover applied to uranium mill tailings. To help determine design stresses for the tailings piles, environmental parameters are characterized for the five active uranium-producing regions on a site-specific basis. Only conventional uranium mills that are currently operating or that are scheduled to open in the mid 1980s are considered. Available data indicate that flooding has the most potential for disrupting a tailings pile. The arid regions of the Wyoming Basins and the Colorado Plateau are subject to brief storms of high intensity. The Texas Gulf Coast has the highest potential for extreme precipitation from hurricane-related storms. Wind data indicate average wind speeds from 3 to 6 m/sec for the sites, but extremes of 40 m/sec can be expected. Tornado risks range from low to moderate. The Colorado Plateau has the highest seismic potential, with maximum acceleration caused by earthquakes ranging from 0.2 to 0.4 g. Any direct effect from volcanic eruption is negligible, as all mills are located 90 km or more from an igneous or hydrothermal system

  12. Methods for Measuring Effects of Changes in Tamarisk Evapotranspiration on Groundwater at Southwestern Uranium Mill Tailings Sites

    Science.gov (United States)

    Waugh, W.; Nagler, P. L.; Vogel, J.; Glenn, E.; Nguyen, U.; Jarchow, C. J.

    2016-12-01

    Tamarisk (Tamarix spp.) is a non-native tree that competes with native species for water in riparian corridors of the southwestern U.S. The beetle, Diorhabda carinulata, which was released as a biocontrol agent, may be affecting tamarisk health. After several years of defoliation, tamarisk is now coming back along many southwestern rivers because of dwindling beetle numbers. We studied effects of changes in riparian plant communities dominated by tamarisk on evapotranspiration (ET) at uranium mill tailings sites. We used an unmanned aerial system (UAS) to acquire high resolution spectral data needed to estimate spatial and temporal variability in ET in riparian ecosystems at uranium mill tailings sites adjacent to the San Juan River near Shiprock, New Mexico, and the Colorado River near Moab, Utah. UAS imagery allowed us to monitor changes in phenology, fractional greenness, ET, and effects on water resources at these sites. We timed ground data and UAS image acquisition with an August 2016 Landsat image to assist with spatiotemporal scaling techniques. We measured leaf area index (LAI) and sampled biomass on tamarisk, cottonwood (Populus spp.), and willow (Salix spp.) within the UAS acquisition areas to scale leaf area on individual branches to LAI of whole trees. UAS cameras included a Sony Alpha A5100 for species-level vegetation mapping and a MicaSense Red Edge five-band multispectral camera to map Normalized Difference Vegetation Index (NDVI) and Enhanced Vegetation Index (EVI). The UAS products were correlated with satellite imagery. Our goal was to scale plant water use acquired from UAS imagery to Landsat and/or MODIS to provide a time-series documenting long-term trends and relationships of ET and groundwater elevation. NDVI and EVI were calibrated across UAS, MODIS and Landsat images using regression and ET was calculated using NDVI, EVI, ground meteorological data, and an existing empirical algorithm.

  13. Environmental impact of uranium mining and milling

    International Nuclear Information System (INIS)

    Dory, A.B.

    1981-08-01

    The author introduces the subject with an overview of the regulatory requirments and philosophy applied to uranium mines and mills. The special attention given to tailings management is highlighted, and a discussion of the basic environmental concerns is concluded with an itemizing of the main tasks facing the AECB. The extent of the environmental impact of uranium mining, milling and waste management is illustrated with specific details pertaining to mines in the Elliot Lake area. The author concludes that the impact on the ground and surface water system is not alarming, and the impact on air quality is not significant beyond a few hundred metres from the mining facilities. The publicly perceived impact is discussed, followed by a rationale for the continued licensing of new uranium mining operations complete with tailings management facilities

  14. Post Audit of a Field Scale Reactive Transport Model of Uranium at a Former Mill Site

    Science.gov (United States)

    Curtis, G. P.

    2015-12-01

    Reactive transport of hexavalent uranium (U(VI)) in a shallow alluvial aquifer at a former uranium mill tailings site near Naturita CO has been monitored for nearly 30 years by the US Department of Energy and the US Geological Survey. Groundwater at the site has high concentrations of chloride, alkalinity and U(VI) as a owing to ore processing at the site from 1941 to 1974. We previously calibrated a multicomponent reactive transport model to data collected at the site from 1986 to 2001. A two dimensional nonreactive transport model used a uniform hydraulic conductivity which was estimated from observed chloride concentrations and tritium helium age dates. A reactive transport model for the 2km long site was developed by including an equilibrium U(VI) surface complexation model calibrated to laboratory data and calcite equilibrium. The calibrated model reproduced both nonreactive tracers as well as the observed U(VI), pH and alkalinity. Forward simulations for the period 2002-2015 conducted with the calibrated model predict significantly faster natural attenuation of U(VI) concentrations than has been observed by the persistent high U(VI) concentrations at the site. Alternative modeling approaches are being evaluating evaluated using recent data to determine if the persistence can be explained by multirate mass transfer models developed from experimental observations at the column scale(~0.2m), the laboratory tank scale (~2m), the field tracer test scale (~1-4m) or geophysical observation scale (~1-5m). Results of this comparison should provide insight into the persistence of U(VI) plumes and improved management options.

  15. Progress report on a study of contamination of the human food chain by uranium mill tailings piles

    International Nuclear Information System (INIS)

    Holtzman, R.B.; Urnezis, P.W.; Padova, A.; Bobula, C.M. III.

    1978-01-01

    A study is in progress to estimate the contamination of the human food chain by uranium, 230 Th, 226 Ra, 210 Pb, and 210 Po originating from tailing piles associated with uranium ore processing mills. Rabbits, cattle, vegetables, and grass were collected on or near two uranium mill sites. For controls, similar samples were obtained from areas 20 km or more from the mining and milling operations. For the on-site rabbits the mean 226 Ra concentrations in muscle, lung, and kidney of 5.5, 14, and 15 pCi/kg wet, respectively, were substantially higher than those in the respective tissues of control animals (0.4, 1.5, and 0.2 pCi/kg). The levels in liver did not differ significantly between the groups. The concentrations in bone (femur and vertebra) were about 9000 and 350 pCi/kg ash for the on- and off-site animals, respectively. The levels of 210 Pb and 210 Po did not differ significantly for a given tissue between the two groups. For cattle the existing data indicate that the concentrations of radionuclides do not differ greatly between those grazed near the pile and the controls, except that the 210 Pb concentration in the liver of an exposed animal is greater than that of the control. Vegetables from a residential area on a mill site contained substantially greater concentrations of 226 Ra and 210 Pb than those reported for standard New York City diets

  16. Environmental Development Plan: uranium mining, milling, and conversion

    International Nuclear Information System (INIS)

    1979-08-01

    This Environmental Development Plan (EDP) identifies the planning and management requirements and schedules needed to evaluate and assess the environmental, health, and safety (EH and S) aspects of the uranium mining, milling, and conversion technologies. The plan represents the collective perceptions of EH and S concerns and requirements and knowledge of ongoing research programs of most of the Federal agencies involved in significant EH and S R and D program management, standards setting, or regulatory activities associated with uranium mining, milling, and conversion

  17. Environmental radioactivity and mitigation of radiological impact at legacy uranium sites in Portugal

    International Nuclear Information System (INIS)

    Carvalho, F.

    2014-01-01

    Uranium legacy sites in the country contain large amounts of milling tailings, mining waste, old infrastructures and acid mine drainage with high radioactivity concentrations. Radioactivity surveillance of these sites has been maintained for many years and institutional control kept beyond cessation of Portuguese uranium mining in 2001. A research programme (2003-2006) requested by the government to assess environmental contamination and public health risks in these regions advised implementing environmental remediation measures. A national programme was approved for remediation of abandoned mine sites, including radioactive and non-radioactive mines, that started in 2005 and since has completed significant remediation works in several old uranium mines. One amongst these sites, the Urgeiriça mine and milling site, was re-engineered, tailings were covered, the mine was closed, the area of mine and milling facilities cleaned, and an automated contaminated water treatment plant installed. Environmental radioactivity surveys carried out in this region showed reduced ambient radiation doses, lower radon concentrations in surface air, return to background radioactivity in surface air aerosols, and decrease of radionuclide concentrations in the river receiving water discharges from the mine site, resulting in a reduced radiation exposure to members of the public. Other legacy uranium mines without milling tailings, were mainly remediated for landscape engineering and the adopted solutions included, for example, preservation of non-contaminated ponds for public leisure. Although not completed yet in many sites, the remediation works implemented contributed already to a significant abatement of radiation exposure allowing for safer implementation of activities, such as agriculture and cattle grazing, in the surroundings of legacy sites. Environmental remediation and abatement of radiation exposure contributed to revitalize socio-economic activities of the region and

  18. Uranium milling: Volume 1, Summary and text: Generic environmental impact statement: Draft

    International Nuclear Information System (INIS)

    1979-04-01

    This generic environmental impact statement on uranium milling has been prepared in accordance with a notice of intent published by the Nuclear Regulatory Commission (NRC). The purpose of the statement is to assess the potential environmental impacts of uranium milling operations, in a programmatic context, including the management of uranium mill tailings, and to provide an opportunity for public participation in decisions on any proposed changes in NRC regulations based on this assessment. The principal objectives of the statement are to assess the nature and extent of the environmental impacts of uranium milling in the United states from local, regional, and national perspectives on both short- and long-term bases, to determine what regulatory actions are needed; to provide information on which to determine what regulatory requirements for management and disposal of mill tailings and mill decommissioning should be; and to support any rule makings that may be determined to be necessary. 39 figs., 130 tabs

  19. Distribution of uranium-238 in environmental samples from a residential area impacted by mining and milling activities

    International Nuclear Information System (INIS)

    McConnell, M.A.; Ramanujam, V.M.S.; Alcock, N.W.; Gabehart, G.J.; Au, W.W.

    1998-01-01

    The northern region of Karnes County, Texas, USA, has been the site of extensive mining/milling of uranium for over 30 years. A previous study in their laboratory indicates that residents living near these facilities have increased chromosomal aberrations and a reduced DNA repair capacity. In this study, the long-lived radionuclides uranium-238 ( 238 U) and thorium-232 ( 232 Th) were measured in order to evaluate the extent of contamination from mining/milling facilities. 232 Th was quantified simultaneously and served as a reference. Soil samples were collected from the yards of previously studied households and adjacent areas near former mining and mining/milling sites at the surface and 30 cm subsurface. Additionally, samples from drinking water wells were collected from selected households. Sites located over 14 km from the study area with no known history of mining/milling served as the control. In the control area, 238 U concentrations in soil were consistent between surface (0.13--0.26 mg/kg) and subsurface samples. Near mining/milling sites, 238 U in surface soil was found to be consistently and statistically higher than corresponding subsurface samples. Near mining-only areas, 238 U in surface soil, however, was not significantly increased over subsurface soil. As expected, 238 U was much higher overall in the mining/milling and mining-only areas compared to the control sites. No trends were detected in the distribution of 232 Th. The concentration of 238 U was up to six times higher in a drinking water well near a former mining/milling operation, indicating possible leaching into the groundwater, while 232 Th concentrations were low and uniform. Furthermore, lead isotope ratio analysis indicates contamination from the interstate shipping of ore by rail to and from a mining/milling facility. These data indicate contamination of the environment by the mining/milling activities in a residential area

  20. Health risks from uranium mill tailings

    International Nuclear Information System (INIS)

    Russell, J.L.

    1992-01-01

    This paper reviews the risk to public health and the environment from uranium mill tailings. The steps taken by the Environmental Protection Agency (EPA) to reduce this risk from tailing are summarized

  1. Optimization of uranium mill tailings disposal practices

    International Nuclear Information System (INIS)

    Richardson, Allan C.B.; Rowe, William D.

    1984-01-01

    So far as we have been to discern, no uranium mill tailings pile has yet been properly stabilized for long-term disposal. And although considerable effort is now being directed at developing practical solutions and at establishing standards for permanent disposal, the difficulties in application are diverse. They arise from the variety of environments in which milling is conducted, the significant costs associated with disposing of the large volumes of materials involved, the diverse nature of the hazards to be protected against, and uncertainties in both performance of controls and in how to determine societal responsibilities for management of the long term hazards to human populations from uranium tailings. There are 24 uranium tailings piles in the United States which no longer have responsible owners, and must now be disposed of by the U.S. Government in order to protect public health

  2. The paradox of uranium development: A Polanyian analysis of social movements surrounding the Pinon Ridge Uranium Mill

    Science.gov (United States)

    Malin, Stephanie A.

    Renewal of nuclear energy development has been proposed as one viable solution for reducing greenhouse gas emissions and impacts of climate change. This discussion became concrete as the first uranium mill proposed since the end of the Cold War, the Pinon Ridge Uranium Mill, received state permits in January 2011 to process uranium in southwest Colorado's Paradox Valley. Though environmental contamination from previous uranium activity caused one local community to be bulldozed to the ground, local support for renewed uranium activity emerges among local residents in communities like Nucla, Naturita, and Bedrock, Colorado. Regionally, however, a coalition of organized, oppositionbased grassroots groups fights the decision to permit the mill. Combined, these events allow social scientists a natural laboratory through which to view social repercussions of nuclear energy development. In this dissertation, I use a Polanyian theoretical framework to analyze social, political-economic, and environmental contexts of social movements surrounding PR Mill. My overarching research problem is: How might Polanyian double movement theory be applied to and made empirically testable within the social and environmental context of uranium development? I intended this analysis to inform energy policy debates regarding renewable energy. In Chapter 1, I found various forms of social dislocation lead to two divergent social movement outcomes. Economic social dislocation led to strong mill support among most local residents, according to archival, in-depth interview, and survey data. On the other hand, residents in regional communities experienced two other types of social dislocation -- another kind of economic dislocation, related to concern over boom-bust economies, and environmental health dislocations related to uranium exposure, creating conditions for a regional movement in opposition to PR Mill. In Chapter 2, I focus on regulations and find that two divergent social movements

  3. Radon emanation characteristics of uranium mill tailings

    International Nuclear Information System (INIS)

    Nielson, K.K.; Freeman, H.D.; Hartley, J.N.; Mauch, M.L.; Rogers, V.C.

    1982-01-01

    Radon emanation from uranium mill tailings was examined with respect to the mechanisms of emanation and the physical properties of the tailings which affect emanation. Radon emanation coefficients were measured at ambient moisture on 135 samples from the 1981 field test site at the Grand Junction tailings pile. These coefficients showed a similar trend with moisture to those observed previously with uranium ores, and averaged 0.10 + or - 0.02 at dryness and 0.38 + or - 0.04 for all samples having greater than five weight-percent moisture. Small differences were noted between the maximum values of the coefficients for the sand and slime fractions of the tailings. Separate measurements on tailings from the Vitro tailings pile exhibited much lower emanation coefficients for moist samples, and similar coefficients for dry samples. Alternative emanation measurement techniques were examined and procedures are recommended for use in future work

  4. Recycling and reuse of wastewater from uranium mining and milling

    International Nuclear Information System (INIS)

    Xu Lechang; Gao Jie; Zhang Xueli; Wei Guangzhi; Zhang Guopu

    2010-01-01

    Uranium mining/milling process, and the sources, recycling/reuse approach and treatment methods of process wastewater are introduced. The wastewater sources of uranium mining and milling include effluent, raffinate, tailings water, mine discharge, resin form converted solution, and precipitation mother liquor. Wastewater can be recycled/reused for leachant, eluent, stripping solution,washing solution and tailings slurry. (authors)

  5. Overview of IAEA activities in restoration of former uranium mining and milling sites

    International Nuclear Information System (INIS)

    Falck, W.E.

    2000-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognised that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure world-wide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  6. Overview of IAEA activities in restoration of former uranium mining and milling sites

    International Nuclear Information System (INIS)

    Falck, W.E.

    2002-01-01

    The IAEA has increasingly become concerned with the radiological and environmental impact of closed uranium mining and milling facilities. It is recognized that inappropriate practices in waste management and the lack of closeout plans have lead to environmental hazards and the potential for human exposure worldwide. In many instances the operators or those responsible for radiation and environmental protection lacked the experience in planning and executing remediation and restoration projects. Through a series of technical documents and other means, which are reviewed briefly in this paper, the IAEA strives to provide guidance and examples for the selection and application of adequate remediation technologies and restoration practices. Emphasis is put upon a comprehensive planning process leading to technology selection. This process commences with proper site characterisation on the basis of which a strategy is to be developed and finishes with post-closure monitoring as an integral instrument of quality control and quality assurance. (author)

  7. Environmental assessment of remedial action at the inactive uraniferous lignite processing sites at Belfield and Bowman, North Dakota

    International Nuclear Information System (INIS)

    Beranich, S.; Berger, N.; Bierley, D.; Bond, T.M.; Burt, C.; Caldwell, J.A.; Dery, V.A.; Dutcher, A.; Glover, W.A.; Heydenburg, R.J.; Larson, N.B.; Lindsey, G.; Longley, J.M.; Millard, J.B.; Miller, M.; Peel, R.C.; Persson-Reeves, C.H.; Titus, F.B.; Wagner, L.

    1989-09-01

    The Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA), to clean up the Belfield and Bowman, North Dakota, uraniferous lignite processing sites to reduce the potential health impacts associated with the residual radioactive materials remaining at these sites. Remedial action at these sites must be performed in accordance with the US Environmental Protection Agency's (EPA) standards promulgated for the remedial action and with the concurrence of the US Nuclear Regulatory Commission (NRC) and the state of North Dakota. The inactive Belfield uraniferous lignite processing site is one mile southeast of Belfield, North Dakota. The inactive Bowman uraniferous lignite processing site at the former town of Griffin, is seven miles northwest of Bowman, North Dakota and 65 road miles south of Belfield. Lignite ash from the processing operations has contaminated the soils over the entire 10.7-acre designated Belfield site and the entire 12.1-acre designated Bowman site. Dispersion of the ash has contaminated an additional 20.6 acres surrounding the Belfield processing site and an additional 59.2 acres surrounding the Bowman processing site. The proposed remedial action is to relocate the contaminated materials at the Belfield processing site to the Bowman processing/disposal site for codisposal with the Bowman contaminated soils. The environmental impacts assessed in this EA were evaluated for the proposed remedial action and the no action alternative and demonstrate that the proposed action would not significantly affect the quality of the human environment and would be performed in compliance with applicable environmental laws. The no action alternative would not be consistent with the intent of Public Law 95-604 and would not comply with the EPA standards. 48 refs., 10 figs., 7 tabs

  8. Radiological survey of the inactive uranium-mill tailings at Riverton, Wyoming

    International Nuclear Information System (INIS)

    Haywood, F.F.; Lorenzo, D.; Christian, D.J.; Chou, K.D.; Ellis, B.S.; Shinpaugh, W.H.

    1980-03-01

    Results of a radiological survey performed at the Riverton, Wyoming site in July 1976, are presented. The average external gamma exposure rate at 1 m over the tailings pile was 56 μR/hr. The corresponding rate for the former mill area was 97 μR/hr. Movement of tailings particles in a dry wash is evident; but it appears that, in general, the earth cover over the tailings pile has been effective in limiting both wind and water erosion of the tailings. The calculated concentration of 226 Ra as a function of depth in 15 augered holes is presented graphically. A survey of the Teton Division Lumber Company property in Riverton showed a maximum external gamma exposure rate of 270 μR/hr

  9. Remedial Action Plan and final design for stabilization of the inactive uranium mill tailings at Green River, Utah. Volume 1, Text, Appendices A, B, and C: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Matthews, M.L. [USDOE Albuquerque Operations Office, NM (United States). Uranium Mill Tailings Remedial Action Project Office; Alkema, K. [Utah Dept. of Health, Salt Lake City, UT (United States). Environmental Health Div.

    1991-03-01

    This Remedial Action Plan (RAP) has been developed to serve a threefold purpose. It presents the series of activities that are proposed by the US Department of Energy (DOE) to accomplish long-term stabilization and control of radioactive materials at the inactive uranium processing site located near Green River, Utah. It provides a characterization of the present conditions of the site. It also serves to document the concurrence of the state of Utah and the US Nuclear Regulatory Commission (NRC) in the remedial action. This agreement, upon execution by the DOE and the state of Utah, and concurrence by the NRC, becomes Appendix 8 of the Cooperative Agreement.

  10. Final environmental statement related to the Western Nuclear, Inc., Split Rock Uranium Mill (Fremont County, Wyoming)

    International Nuclear Information System (INIS)

    1980-02-01

    The proposed action is the renewal of Source Material License SUA-56 (with amendments) issued to Western Nuclear, Inc. (WNI), for the operation of the Split Rock Uranium Mill near Jeffrey City and the Green Mountain Ion-Exchange Facility, both in Fremont County, Wyoming. The license also permits possession of material from past operations at four ancillary facilities in the Gas Hills mining area - the Bullrush, Day-Loma, Frazier-Lamac, and Rox sites (Docket No. 40-1162). However, although heap leaching operations were previously authorized at Frazier-Lamac, there has never been any processing of material at this site. The Split Rock mill is an acid-leach, ion-exchange and solvent-extraction uranium-ore processing mill with a design capacity of 1540 MT (1700 tons) of ore per day. WNI has proposed by license amendment request to increase the storage capacity of the tailings ponds in order to permit the continuation of present production rates of U 3 O 8 through 1996 using lower-grade ores

  11. Uranium mill tailings management practices in Saskatchewan, Canada

    International Nuclear Information System (INIS)

    Clifton, A.W.; Barsi, R.G.; Melis, L.A.

    1984-01-01

    Uranium was discovered in Saskatchewan in 1934. The first major mill began operating at Beaverlodge in 1953; two other mills began production in the same area in 1955 and 1957. Waste management measures were limited at the early mills. A new generation of mills was brought into production beginning in 1975 utilizing engineered waste management systems. The paper presents a brief description of the geography and physical environment of northern Saskatchewan, Canada; reviews milling operations and waste managements systems; describes the evolution of waste management systems; and, comments on environmental control measures regulating the industry

  12. Uranium Mill Tailings Remedial Action Project fiscal year 1997 annual report to stakeholders

    International Nuclear Information System (INIS)

    1997-01-01

    The fiscal year (FY) 1997 annual report is the 19th report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction or landscaping. Cleanup has been undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the groundwater project. This report addresses specifics about the UMTRA surface project

  13. Fiscal year 1996 annual report to stakeholders, Uranium Mill Tailings Remedial Action Project

    International Nuclear Information System (INIS)

    1996-01-01

    This is the Fiscal Year (FY) 1996 annual report on the status of the US Department of Energy's (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. In 1978, Congress directed the DOE to assess and clean up contamination at 24 designated former uranium processing sites. The DOE is also responsible for cleaning up properties in the vicinity of the sites where wind and water erosion deposited tailings or people removed them from the site for use in construction of landscaping. Cleanup is being undertaken in cooperation with state governments and Indian tribes within whose boundaries the sites are located. It is being conducted in two phases: the surface project and the ground water project. This report addresses specifics about the surface phase of the UMTRA Project

  14. Biological assessment of remedial action at the abandoned uranium mill tailings site near Naturita, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Pursuant to the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, the U.S. Department of Energy (DOE) is proposing to conduct remedial action to clean up the residual radioactive materials (RRM) at the Naturita uranium processing site in Colorado. The Naturita site is in Montrose County, Colorado, and is approximately 2 miles (mi) (3 kilometer [km]) from the unincorporated town of Naturita. The proposed remedial action is to remove the RRM from the Naturita site to the Upper Burbank Quarry at the Uravan disposal site. To address the potential impacts of the remedial action on threatened and endangered species, the DOE prepared this biological assessment. Informal consultations with the U.S. Department of the Interior, Fish and Wildlife Service (FWS) were initiated in 1986, and the FWS provided a list of the threatened and endangered species that may occur in the Naturita study area. This list was updated by two FWS letters in 1988 and by verbal communication in 1990. A biological assessment was included in the environmental assessment (EA) of the proposed remedial action that was prepared in 1990. This EA addressed the impacts of moving the Naturita RRM to the Dry Flats disposal site. In 1993, the design for the Dry Flats disposal alternative was changed. The FWS was again consulted in 1993 and provided a new list of threatened and endangered species that may occur in the Naturita study area. The Naturita EA and the biological assessment were revised in response to these changes. In 1994, remedial action was delayed because an alternate disposal site was being considered. The DOE decided to move the FIRM at the Naturita site to the Upper Burbank Quarry at the Uravan site. Due to this delay, the FWS was consulted in 1995 and a list of threatened and endangered species was provided. This biological assessment is a revision of the assessment attached to the Naturita EA and addresses moving the Naturita RRM to the Upper Burbank Quarry disposal site.

  15. Remedial actions at the former Climax Uranium Company Uranium Mill Site, Grand Junction, Mesa County, Colorado. Volume 1. Text. Draft environmental impact statement

    International Nuclear Information System (INIS)

    1986-03-01

    This statement evaluates and compares the environmental impacts associated with the remedial actions of the residual radioactive materials remaining at the inactive uranium processing site and associated vicinity properties at Grand Junction, Mesa County, Colorado. The site is a 114-acre tract of private and state owned land which contains approximately 3.1 million cubic yards of tailings and associated contaminated soils. The vicinity properties are homes, businesses, public buildings, and vacant lots which may have been contaminated during construction by the use of tailings as building material. An estimated 3465 vicinity properties would be cleaned up during remedial action of the tailings pile. This statement evaluates six alternatives for stabilization and disposal of the tailings and other contaminated materials: no action; stabilization at the Grand Junction site; disposal at the Cheney Reservoir site with truck transport; disposal at the Cheney Reservoir site with train and truck transport; disposal at the Two Road site with truck transport; disposal at the Two Road site with train and truck transport. All of the alternatives except include remedial action at an estimated 3465 vicinity properties. Alternative 3 is DOE's preferred alternative. 29 figs., 25 tabs

  16. Milling uranium silicide powder for dispersion nuclear fuels

    Energy Technology Data Exchange (ETDEWEB)

    Vieira, E.; Silva, D.G.; Souza, J.A.B.; Durazzo, M. [Instituto de Pesquisas Energeticas e Nucleares (IPEN/CNEN-SP), Sao Paulo, SP (Brazil); Riella, H.G. [Universidade Federal de Santa Catarina (UFSC), Florianopolis, SC (Brazil)

    2009-07-01

    Full text: Uranium silicide (U3Si2) is presently considered the best fuel qualified so far in terms of uranium loading and performance. Stability of the U3Si2 fuel with uranium density of 4.8 g/cm3 was confirmed by burnup stability tests performed during the Reduced Enrichment for Research and Test Reactors (RERTR) program. This fuel was chosen to compose the first core of the new Brazilian Multipurpose Research Reactor (RMB), planned to be constructed in the next years. This new reactor will consume bigger quantities of U3Si2 powder, when compared with the small consumption of the IEA-R1 research reactor of IPEN-CNEN/SP, the unique MTR type research reactor operating in the country. At the present time, the milling operation of U3Si2 ingots is made manually. In order to increase the powder production capacity, the manual milling must be replaced by an automated procedure. This paper describes a new milling machine and procedure developed to produce U3Si2 powder with higher efficiency. (author)

  17. Radioecological surveillance around an old mining and milling site during environmental remediation works

    International Nuclear Information System (INIS)

    Carvalho, Fernando P.; Oliveira, Joao M.; Malta, Margarida

    2008-01-01

    The main site of historic uranium mining and milling in Portugal, near the town of Canas de Senhorim, contains around 2.5 million tones of solid waste containing radioactivity in various mill tailings and spoil heaps. Approval of an environmental remediation plan for this area was followed by the start of engineering works, including the transportation of milling waste to the main milling pile and re shaping and contouring the waste heap to put a cap layer. These works were mostly performed in 2006 and 2007. During part of this period monitoring of radioactivity, including radon, was performed in the surface air, surface waters from the area, including the monitoring of the small river that receives drainage from the mill tailings area, and agriculture products. This paper presents the results of measurements of the main alpha emitting radionuclides of uranium series and compares them with previous data from the region. Implications for the radiological protection of the population are discussed. (author)

  18. Underground Milling of High-Grade Uranium Ore

    Energy Technology Data Exchange (ETDEWEB)

    Edwards, C., E-mail: chuck.edwards@amec.com [AMEC Americas Limited, Saskatoon, Saskatchewan (Canada)

    2014-05-15

    There are many safety and technical issues involved in the mining and progressing of high grade uranium ores such as those exploited in Northern Canada at present. With more of this type of mine due to commence production in the near future, operators have been looking at ways to better manage the situation. The paper describes underground milling of high-grade uranium ore as a means of optimising production costs and managing safety issues. In addition the paper presents some examples of possible process flowsheets and plant layouts that could be applicable to such operations. Finally an assessment of potential benefits from underground milling from a variety of viewpoints is provided. (author)

  19. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Salt Lake City, Utah. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the first is the Surface Project, and the second is the Ground Water Project. For the UMTRA Project site known as the Vitro site, near Salt Lake City, Utah, Surface Project cleanup occurred from 1985 to 1987. The UMTRA Project`s second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. A risk assessment is the process of describing a source of contamination and showing how that contamination may reach people and the environment. The amount of contamination people or the environment may be exposed to is calculated and used to characterize the possible health or environmental effects that may result from this exposure. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Vitro site. The results of this report and further site characterization of the Vitro site will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards.

  20. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Salt Lake City, Utah. Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project consists of two phases: the first is the Surface Project, and the second is the Ground Water Project. For the UMTRA Project site known as the Vitro site, near Salt Lake City, Utah, Surface Project cleanup occurred from 1985 to 1987. The UMTRA Project's second phase, the Ground Water Project, evaluates the nature and extent of ground water contamination resulting from uranium processing and determines a strategy for ground water compliance with the Environmental Protection Agency (EPA) ground water standards established for the UMTRA Project. A risk assessment is the process of describing a source of contamination and showing how that contamination may reach people and the environment. The amount of contamination people or the environment may be exposed to is calculated and used to characterize the possible health or environmental effects that may result from this exposure. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Project at the Vitro site. The results of this report and further site characterization of the Vitro site will be used to determine what is necessary, if anything, to protect human health and the environment while complying with EPA standards

  1. Radon-222 emissions and control practices for licensed uranium mills and their associated tailings piles. Final report

    International Nuclear Information System (INIS)

    1985-06-01

    The report is organized into five main sections. The conclusions of the effort are summarized in Chapter 2. A general description of current milling and tailings management practices and a summary of the site-specific characteristics of operating and standby uranium mills are contained in Chapter-3. The sources and emission rates of radon-222 at licensed mills and their associated tailings piles are contained in Chapter 4 along with the results of an effort to develop generic procedures to estimate radon-222 emissions for milling operations and tailings disposal. Control practices that are being or could be applied to the milling operation and tailings disposal areas and their estimated cost and effectiveness in reducing radon-222 emissions are presented in Chapter 5. The appendices contain detailed information on mill site data and emission estimates

  2. Decommissioning of the Zirovski Vrh Uranium Mill

    International Nuclear Information System (INIS)

    Zabukovec, I.; Logar, Z.; Arh, S.

    1996-01-01

    First of the inventions, which will ensure the beginning of the permanent closure of uranium ore exploitation and prevent the consequences of mining in the Zirovski Vrh Uranium Mine, abandoned according to the law from July 1992, will be soon realized. After obtaining the location permit for dismantling the equipment, foundations and installations in four main buildings of the uranium mill, current procedures are carried out in order to obtain the permission for performing the mentioned activities and to make contracts with acting organizations. Those buildings contain sources of radiation, which were considered within the legal procedures and design of technical documentation. Instructions for decontamination and protection against radiation, both issued with those projects, highly contribute to the Slovenian experience in the field of practical management of radiation sources. Additional requirement, which enters difference between decommissioning of similar mills worldwide and the one mentioned, is preservation of buildings in order to change their purpose. (author)

  3. Health concerns in uranium mining and milling

    International Nuclear Information System (INIS)

    Archer, V.E.

    1981-01-01

    Mortality of uranium miners from both lung cancer and other respiratory diseases is strongly dependent on exposure to radon daughters, cigarette smoking and height. Lung cancer among 15 different mining groups (uranium, iron, lead, zinc) was analyzed to determine what factors influence incidence and the induction-latent period. At low exposure or exposure rates, alpha radiation is more efficient in inducing lung cancer, producing an upward convex exposure-response curve. The induction-latent period is shortened by increased age at start of mining, by cigarette smoking and by high exposure rates. Instead of extrapolating downward from high exposures to estimate risk at low levels, it is suggested that it might be more appropriate to use cancer rates associated with background radiation as the lowest point on the exposure-response curve. Although health risks are much greater in uranium mines than mills, there is some health risk in the mills from long-lived radioactive materials

  4. Measurement and calculation of radon releases from uranium mill tailings

    International Nuclear Information System (INIS)

    1992-01-01

    The mining and milling of uranium ores produces large quantities of radioactive wastes. Although relatively small in magnitude compared to tailings from metal mining and extraction processes, the present worldwide production of such tailings exceeds 20 million tonnes annually. There is thus a need to ensure that the environmental and health risks from these materials are reduced to an acceptable level. This report has been written as a complement to another publication entitled Current Practices for the Management and Confinement of Uranium Mill Tailings, IAEA Technical Reports Series No. 335, which provides a general overview of all the important factors in the siting, design and construction of tailings impoundments, and in the overall management of tailings with due consideration give to questions of the release of pollutants from tailings piles. The present report provides a comprehensive overview of the release, control and monitoring of radon, including computational methods. The report was first drafted in 1989 and was then reviewed at an Advisory Group meeting in 1990. 42 refs, 9 figs, 3 tabs

  5. Development of uranium milling and conversion

    International Nuclear Information System (INIS)

    Takada, Shingo; Hirono, Shuichiro.

    1983-11-01

    The development and improvement of uranium milling and refining producing uranium tetrafluoride from ores by the wet process, without producing yellowcake as an intermediate product, have been carried out for over ten years with a small pilot plant (50 t-ore/day). In the past several years, a process for converting uranium tetrafluoride into hexafluoride has been developed successfully. To develop the process further, the construction of an integrated milling and conversion pilot plant (200 t-U/year) started in 1979 and was completed in 1981. This new plant has two systems of solvent extraction using tri-noctylamine: one of the systems treats the pregnant solution (uranyl sulphate) by heap-leaching followed by ion exchange, and the other treats the uranyl sulphate solution by dissolving imported yellowcake. The uranium loading solvents from the two systems are stripped with hydrochloric acid solution to obtain the concentrated uranium solution containing 100 g-U/1. Uranyl sulphate solution from the stripping circuit is reduced to a uranous sulphate solution by the electrolytic method. In a reduction cell, uranyl sulphate solution and dilute sulphuric acid are used respectively as catholyte and anolyte, and a cation exchange membrane is used to prevent re-oxidation of the uranous sulphate. In the following hydrofluorination step, uranium tetrafluoride, UF 4 .1-1.2H 2 O (particle size: 50-100μ), is produced continuously as the precipitate in an improved reaction vessel, and this makes it possible to simplify the procedures of liquid-solid separation, drying and granulation. The uranium tetrafluoride is dehydrated by heating to 350 0 C in an inert gas flow. The complete conversion from UF 4 into UF 6 is achieved by a fluidized-bed reactor and a high value of utilization efficiency of fluorine, over 99.9 percent, is attained at about 400 0 C. (author)

  6. Intrusion of soil covered uranium mill tailings by whitetail prairie dogs and Richardson's ground squirrels

    International Nuclear Information System (INIS)

    Shuman, R.

    1984-01-01

    The primary objective of the reclamation of uranium mill tailings is the long-term isolation of the matrial from the biosphere. Fossorial and semi-fossorial species represent a potentially disruptive influence as a result of their burrowing habits. The potential for intrusion was investigated with respect to two sciurids, the whitetail prairie dog (Cynomys leucurus) and Richardson's ground squirrel (Spermophilus richardsonii). Populations of prairie dogs were established on a control area, lacking a tailings layer, and two experimental areas, underlain by a waste layer, in southeastern Wyoming. Weekly measurements of prairie dog mound surface activities were conducted to demonstrate penetration, or lack thereof, of the tailings layer. Additionally, the impact of burrowing upon radon flux was determined. Limited penetration of the waste layer was noted after which frequency of inhabitance of the intruding burrow system declined. No significant changes in radon flux were detected. In another experiment, it was found that Richardson's ground squirrels burrowed to less extreme depths when confronted by mill tailings. Additional work at an inactive tailings pile in western Colorado revealed repeated intrusion through a shallow cover, and subsequent transport of radioactive material to the ground surface by prairie dogs. Radon flux from burrow entrances was significantly greater than that from undisturbed ground. Data suggested that textural and pH properties of tailings material may act to discourage repeated intrusion at some sites. 58 references

  7. Reconnaissance soil geochemistry at the Riverton Uranium Mill Tailings Remedial Action Site, Fremont County, Wyoming

    Science.gov (United States)

    Smith, David B.; Sweat, Michael J.

    2012-01-01

    Soil samples were collected and chemically analyzed from the Riverton Uranium Mill Tailings Remedial Action Site, which lies within the Wind River Indian Reservation in Fremont County, Wyoming. Nineteen soil samples from a depth of 0 to 5 centimeters were collected in August 2011 from the site. The samples were sieved to less than 2 millimeters and analyzed for 44 major and trace elements following a near-total multi-acid extraction. Soil pH was also determined. The geochemical data were compared to a background dataset consisting of 160 soil samples previously collected from the same depth throughout the State of Wyoming as part of another ongoing study by the U.S. Geological Survey. Risk from potentially toxic elements in soil from the site to biologic receptors and humans was estimated by comparing the concentration of these elements with soil screening values established by the U.S. Environmental Protection Agency. All 19 samples exceeded the carcinogenic human health screening level for arsenic in residential soils of 0.39 milligrams per kilogram (mg/kg), which represents a one-in-one-million cancer risk (median arsenic concentration in the study area is 2.7 mg/kg). All 19 samples also exceeded the lead and vanadium screening levels for birds. Eighteen of the 19 samples exceeded the manganese screening level for plants, 13 of the 19 samples exceeded the antimony screening level for mammals, and 10 of 19 samples exceeded the zinc screening level for birds. However, these exceedances are also found in soils at most locations in the Wyoming Statewide soil database, and elevated concentrations alone are not necessarily cause for alarm. Uranium and thorium, two other elements of environmental concern, are elevated in soils at the site as compared to the Wyoming dataset, but no human or ecological soil screening levels have been established for these elements.

  8. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.` different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments.

  9. Uranium Mill Tailings Remedial Action Project 1994 environmental report

    International Nuclear Information System (INIS)

    1995-08-01

    This annual report documents the Uranium Mill Tailings Remedial Action (UMTRA) Project environmental monitoring and protection program. The UMTRA Project routinely monitors radiation, radioactive residual materials, and hazardous constituents at associated former uranium tailings processing sites and disposal sites. At the end of 1994, surface remedial action was complete at 14 of the 24 designated UMTRA Project processing sites: Canonsburg, Pennsylvania; Durango, Colorado; Grand Junction, Colorado; Green River Utah, Lakeview, Oregon; Lowman, Idaho; Mexican Hat, Utah; Riverton, Wyoming; Salt Lake City, Utah; Falls City, Texas; Shiprock, New Mexico; Spook, Wyoming, Tuba City, Arizona; and Monument Valley, Arizona. Surface remedial action was ongoing at 5 sites: Ambrosia Lake, New Mexico; Naturita, Colorado; Gunnison, Colorado; and Rifle, Colorado (2 sites). Remedial action has not begun at the 5 remaining UMTRA Project sites that are in the planning stage. Belfield and Bowman, North Dakota; Maybell, Colorado; and Slick Rock, Colorado (2 sites). The ground water compliance phase of the UMTRA Project started in 1991. Because the UMTRA Project sites are.' different stages of remedial action, the breadth of the UMTRA environmental protection program differs from site to site. In general, sites actively undergoing surface remedial action have the most comprehensive environmental programs for sampling media. At sites where surface remedial action is complete and at sites where remedial action has not yet begun, the environmental program consists primarily of surface water and ground water monitoring to support site characterization, baseline risk assessments, or disposal site performance assessments

  10. Review of environmental aspects of uranium mill operations: industry's view

    International Nuclear Information System (INIS)

    Beverly, R.G.

    1977-01-01

    Problems faced by uranium mill operators in complying with new environmental regulations and guidelines are discussed. It is pointed out that valid data must be available in order to evaluate impacts on the environment, to determine background radiation levels, to measure the effectiveness of control techniques, and to determine compliance with standards and regulations. Specific problem areas facing mill operators today and some of the unresolved questions include: sampling methods and equipment for radon in ambient air, measurements of radon and radon daughter exposures of people, radon emanation rate meaurements applicable to monitoring mill tailings, the calibration of γ counters, measurements of population doses, regulations concerning mill tailings reclamation nd stabilization, and the comparative value of in-vivo counting and uranium urinary excretion measurements for monitoring personnel

  11. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    International Nuclear Information System (INIS)

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs

  12. Environmental Audit, Rifle, Gunnison and Grand Junction UMTRA Project Sites

    Energy Technology Data Exchange (ETDEWEB)

    None

    1991-08-01

    This report documents the results of the comprehensive baseline Environmental Audit completed for the Uranium Mill Tailings Remedial Action (UMTRA) sites at Grand Junction, Rifle, and Gunnison, Colorado. Included in the Audit were the actual abandoned mill sites, associated transportation and disposal cell facilities, and representative examples of the more than 4,000 known vicinity properties. Sites investigated include: Climax Mill Site, Truck/Train Haul Route, Cotter Transfer Station, Cheney Disposal Cell, Rifle Mill Sites (Old and New Rifle), Gunnison Mill Site, Vicinity Properties, and Estes Gulch and Proposed Landfill Site No. 1 Disposal Cells. The UMTRA Audit was a comprehensive baseline audit which considered all environmental programs and the activities associated with ongoing and planned remediation at the UMTRA sites listed above. Compliance with the National Environmental Policy Act (NEPA) was not considered during this investigation. The Audit Team looked at the following technical disciplines: air, surface water/drinking water, groundwater, soil/sediment/biota, waste management, toxic and chemical materials, quality assurance, radiation, inactive waste sites, and environmental management. 6 figs., 12 tabs.

  13. Domestic uranium mining and milling industry 1991

    International Nuclear Information System (INIS)

    1992-12-01

    This report was prepared by the Energy Information Administration to provide the Secretary of Energy with basic data and analyses for ninth annual determination of the viability of the domestic uranium mining and milling industry. A viability determination is required annually, for the years 1983 through 1992, by Section 170B of the Nuclear Regulatory Commission (NRC) Authorization Act of 1983, Public Law 97-415, which amend the Atomic Energy Act of 1954. Topics include: evolution of the U.S. uranium industry; nuclear power requirements and uranium industry projections; and attributes of industry viability

  14. Cap stabilization for reclaimed uranium sites

    International Nuclear Information System (INIS)

    Abt, S.R.; Nelson, J.D.; Johnson, T.L.; Hawkins, E.F.

    1989-01-01

    The reclamation and stabilization of uranium-mill tailings sites requires engineering designs to protect against the disruption of tailings and the potential release of radioactive materials. The reclamation design is to be effective for 200-1000 years. This paper presents recently developed or refined techniques and methodologies used to evaluate uranium-tailings-reclamation plans designed to provide long-term stability against failure modes. Specific cap-design aspects presented include design flood selection, influence of fluvial geomorphology on site stabilization, stable slope prediction, slope stabilization using riprap, and riprap selection relative to rock quality and durability. Design relationships are presented for estimating flow through riprap, sizing riprap, and estimating riprap flow resistance for overtopping conditions. Guidelines for riprap-layer thickness and gradation are presented. A riprap-rating procedure for estimating rock quality and durability is also presented

  15. 226Ra and 210Pb relationship in solid wastes and plants at Uranium mill tailing

    International Nuclear Information System (INIS)

    Madruga, M.J.; Faria, I.; Brogueira, A.

    2002-01-01

    After the uranium extraction from the ore, the waste residues (tailings) contain several radionuclides in elevated levels comparing to normal soils. Nearly all of the uranium progenies (2 30T h, 2 26R a, 2 10P b and 2 10P o) and the unextracted uranium fraction are present in tailings. These large quantities of tailings may provide a significant source of environmental and food chain contamination. The transfer of radioisotopes between different ecological compartments is frequently evaluated using ratios which relate the radionuclide content in one ecosystem compartment to that of another. For instance, the concentration ratio (CR), i.e., the ratio between radionuclide concentrations in tailings and plants can be evaluated. Radium-226, a long-lived alfa emitter, is a chemical analog of calcium. The 2 26R a uptake is similar to calcium in biological and ecological systems. The uptake of 2 10P b will follow the same pattern as natural lead. Plants do not require lead but in contrast they require the Ra/Ca group elements. The uptake of lead is mainly a function of the lead tolerance of the plant and the hydrogen ion concentration of the soil. Kalin and Sharma (1982) reported that 2 26R a and 2 10P b uptake by indigenous species from inactive uranium mill tailings in Canada differ from the uptake of the elements by the same plants growing in soil. Ibrahim and Whicker (1992) reported that tailing acidity tends to enhance radionuclide availability for plant uptake. The transport of radionuclides to foliage and subsequent retention and absorption may play a role in plant contamination. The main goal of this study is to evaluate the 2 26R a and 2 10P b relationship in tailings and plants growing at uranium mill tailings

  16. Releases of radioactivity from uranium mills and effluent treatment costs

    International Nuclear Information System (INIS)

    Witherspoon, J.P.; Sears, M.B.; Blanco, R.E.

    1977-01-01

    Airborne releases of radioactive materials from uranium milling to the environment consist of ore dust, yellowcake dust, tailings dust, and radon gas while the mill is active. After a mill has ceased operations, tailings may be stabilized to minimize or prevent airborne releases of radioactive particulates. However, radon gas will continue to be released in amounts inversely proportional to the degree of stabilization treatment (and expense). Liquid waste disposal is by evaporation and natural seepage to the ground beneath the tailings impoundment area. The release of radioactive materials (and potential radiation exposures) determines the majority of costs associated with minimizing the environmental impact of uranium milling. Radwaste treatments to reduce estimated radiation doses to individuals to 3 to 5% of those received with current milling practices are equivalent to $0.66 per pounds of U 3 O 8 and 0.032 mill per kWhr of electricity. This cost would cover a high efficiency reverse jet bag filter and high energy venturi scrubbers for dusts, neutralization of liquids, and an asphalt-lined tailings basin with a clay core dam to reduce seepage. In addition, this increased cost would cover stabilization of tailings, after mill closure, with a 1-in. asphalt membrane topped by 2 ft of earth and 0.5 ft of crushed rock to provide protection against future leaching and wind erosion. The cost of reducing the radiological hazards associated with uranium milling to this degree would contribute about 0.4% to the current total cost of nuclear power

  17. Decommissioning of uranium mines and mills - Canadian regulatory approach and experience

    International Nuclear Information System (INIS)

    Whitehead, W.

    1986-09-01

    At the time of the recent closures of the Agnew Lake, Beaverlodge and Madawaska Mines Limited uranium mining and milling facilities, several relevant regulatory initiatives, including the development of decommissioning criteria, were underway, or contemplated. In the absence of precedents, the regulatory agencies and companies involved adopted approaches to the decommissioning of these facilities that reflected site specific circumstances, federal and provincial regulatory requirements, and generally accepted principles of good engineering practice and environmental protection. This paper summarizes related historical and current regulatory policies, requirements and guidelines; including those implemented at the three decommissioned sites

  18. Remediation of the Gunnar uranium mine site, northern Saskatchewan

    International Nuclear Information System (INIS)

    Calvert, H.T.; Brown, J.L.

    2011-01-01

    The Gunnar uranium mine, located in northern Saskatchewan, operated from 1955 to 1963. When the mine was closed, the site was not remediated to the standards that are in place for today's uranium mines. Waste rock and mill tailings were left un-covered and water quality issues were not addressed. As a result, the current state of the site impacts the local environment. The company that operated the Gunnar Mine no longer exists. In 2006, the Government of Saskatchewan and the Government of Canada entered into an agreement to share the costs for remediating the site. An environment assessment of the project to remediate the site is currently underway. This paper provides an update of the issues and the progress being made. (author)

  19. Analysis of uranium urinalysis and in vivo measurement results from eleven participating uranium mills

    International Nuclear Information System (INIS)

    Spitz, H.B.; Simpson, J.C.; Aldridge, T.L.

    1984-05-01

    Uranium urinalysis and in vivo examination results obtained from workers at eleven uranium mills between 1978 and 1980 were evaluated. The main purpose was to determine the degree of the mills' compliance with bioassay monitoring recommendations given in the draft NRC Regulatory Guide 8.22 (USNRC 1978). The effect of anticipated changes in the draft regulatory guidance, as expressed to PNL in May 1982, was also studied. Statistical analyses of the data showed that the bioassay results did not reliably meet the limited performance criteria given in the draft regulatory guide. Furthermore, quality control measurements of uranium in urine indicated that detection limits at α = β = 0.05 ranged from 13 μg/l to 29 μg/l, whereas the draft regulatory guidance suggests 5 μg/l as the detection limit. Recommendations for monitoring frequencies given in the draft guide were not followed consistently from mill to mill. The results of these statistical analyses indicate a need to include performance criteria for accuracy, precision, and confidence in revisions of the draft Regulatory Guide 8.22. Revised guidance should also emphasize the need for each mill to continually test the laboratory performing urinalyses by submitting quality control samples (i.e., blank and spiked urine samples as open and blind test) to insure that the performance criteria are being met. Recommendations for a bioassay audit program are also given. 25 references, 15 figures, 17 tables

  20. Nuclear-fuel-cycle education: Module 2. Exploration, reserve estimation, mining, milling, conversion, and properties of uranium

    International Nuclear Information System (INIS)

    Brookins, D.G.

    1981-12-01

    In this module geological and geochemical data pertinent to locating, mining, and milling of uranium are examined. Chapters are devoted to: uranium source characteristics; uranium ore exploration methods; uranium reserve estimation for sandstone deposits; mining; milling; conversion processes for uranium; and properties of uranium, thorium, plutonium and their oxides and carbides

  1. Radionuclides distribution, properties, and microbial diversity of soils in uranium mill tailings from southeastern China

    International Nuclear Information System (INIS)

    Yan, Xun; Luo, Xuegang

    2015-01-01

    Objective: To collect the radioactive contamination data for environmental rehabilitation in uranium mill tailings in southeastern China. Method: The sample areas were divided into high, moderate and low concentration areas, according to the uranium concentration. For every area, 3 soil samples were collected at 0–15 cm, 15–30 cm and 30–45 cm depth respectively, with 5 repetitions for each. Total 45 (3 × 5 × 3) soil samples were collected. Physicochemical properties and enzyme activities of soils were determined as described by references. The concentrations of the radionuclides 238 U, 232 Th, 226 Ra and 40 K in soils were determined by using HPGe gamma-ray spectrometer. Soil microbial diversity was analyzed via denaturing gradient gel electrophoresis (DGGE). Results: Soil samples were all acidic. Physicochemical properties, like pH, content of total/available N, P and K, as well as enzyme activities were all increased along with decreased uranium concentration. The 232 Th concentration was increased with the decreased uranium concentration and was not influenced by the depth of sample sites. However, uranium concentration and depth of sample showed no significant influence on the concentrations of 226 Ra and 40 K. The concentration of 232 Th was significantly correlated with that of 226 Ra and 40 K, while the concentrations of 226 Ra and 40 K were significantly correlated. However, Pearson correlation coefficients between 238 U and other radionuclides were not significant. The microbial population in different concentration areas was different with four domain strains in low area, and two for both moderate and high areas. Furthermore, in each sample site, Proteobacteria was the most dominant flora, while environmental samples were the second according to GenBank database. Moreover, Serratia sp. of Proteobacteria was the dominant strain. Conclusion: Radionuclides distribution in the uranium mill tailing showed a profound influence on soil properties and

  2. Geochemical behavior of uranium mill tailings leachate in the subsurface

    International Nuclear Information System (INIS)

    Brookins, D.G.

    1993-01-01

    Leachate generated from surface disposal of acidic uranium mill tailings at Maybell, CO has impacted groundwater quality within the underlying mineralized Browns Park Formation. The extent of groundwater contamination, however, is located directly beneath the tailings impoundment. The milling process consisted of sulfuric acid extraction of uranium from the feed ore by a complex chemical leaching and precipitation process. Tailings leachate at the site contains elevated concentrations of Al, As, Cd, Mo, Ni, NO 3 , Se, U, and other solutes. From column leach tests, the concentrations of contaminants within tailings pore fluid are SO 4 >NH 4 >NO 3 >U>Se>Ni>As>Cd at pH 4.0. The carbonate buffering capacity of the tailings subsoil has decreased because of calcite dissolution in the presence of acidic leachate. Groundwater quality data, mineralogical and microbiological studies, and geochemical modeling suggest that As, NO 3 , Se, U and other solutes are being removed from solution through precipitation, adsorption, and denitrification processes under reducing conditions. Presence of hydrogen sulfide, liquid and gaseous hydrocarbons, dissolved organic, and abundant pyrite within the Browns Park Formations have maintained reducing conditions subjacent to the tailings impoundment. Groundwater is in close equilibrium with coffinite and uraninite, the primary U(IV) minerals extracted from the Browns Parks Formation. Denitrifying bacteria identified in this study catalyze redox reactions involving NO 3 . Subsequently, contaminant distributions of NO 3 decrease 1000 times beneath the tailings impoundment. Applying geochemical and biochemical processes occurring at Maybell provides an excellent model for in situ aquifer restoration programs considered at other uranium tailings and heavy-metal-mixed waste contaminated sites. (author) 4 figs., 4 tabs., 27 refs

  3. Health concerns in uranium mining and milling

    International Nuclear Information System (INIS)

    Archer, V.E.

    1981-01-01

    Mortality of uranium miners form both lung cancer and other respiratory diseases is strongly dependent on exposure to radon daughters, cigarette smoking and height. Lung cancer among 15 different mining groups (uranium, iron, led, zinc) was analyzed to determine what factors influence incidence and the induction-latent period. At low exposure or exposure rates, alpha radiation is more efficient in inducing lung cancer, producing an upward convex exposure-response curve. The induction-latent period is shortened by increased age at start of mining, by cigarette smoking and by high exposure rates. For a follow-up period of 20 to 25 years, the incidence increases with age at start of mining, with magnitude of exposure and with amount of cigarette smoking. Instead of extrapolating downward from high exposures to estimate risk at low levels, it is suggested that it might be more appropriate to use cancer rates associated with background radiation as the lowest point on the exposure-response curve. Although health risks are much greater in uranium mines than mills, there is some health risk in the mills from long-lived radioactive materials

  4. Uranium exploration, mining and milling proposal, Navajo Indian Reservation, New Mexico

    International Nuclear Information System (INIS)

    Babby, W.D.

    1974-01-01

    The Secretary of the Interior has been requested to approve an exploration permit and mining lease which are part of a uranium exploration, mining, and milling Agreement, negotiated between the Navajo Tribe and the Exxon Corporation. The exploration area is a 400,000 acre tract located on the Navajo Reservation in San Juan County, New Mexico. If uranium ore in sufficient quantities to warrant development is discovered, Exxon is authorized to take a total of 51,200 acres to lease for mining, of which only 5,120 surface acres may be used for mining and milling purposes. While all exploration and predevelopment costs prior to mining must be borne by Exxon, the Navajo Tribe has reserved the right to participate in the venture on either a royalty basis or as a partner holding up to a 40 percent working interest. Impacts resulting from exploration will include disturbance of soils and vegetation and air quality degradation resulting from the vehicular movement and the operation of drilling equipment. If mining and milling takes place significant environmental impacts include: sub-surface water depletion, soils and vegetation disturbance, air quality degradation, interruption of the wildlife habitat, population increases, increased demands on community services and facilities, and disruption of established lifestyles and social patterns. Low levels of radioactive emissions will be found at mine and mill sites. Income and employment opportunities from the project to the Navajo Tribe, Navajo people, and the entire San Juan County community will be significant

  5. Systematic approach to designing surface covers for uranium-mill tailings

    International Nuclear Information System (INIS)

    Beedlow, P.A.; Cadwell, L.L.; McShane, M.C.

    1982-01-01

    The wide range of environmental conditions present at uranium mill tailings sites precludes the use of a single type of surface cover. Surface covers must be designed on a site-specific basis. To facilitate site specific designs the UMTRA program is developing guidelines for designing surface covers. This paper presents a systematic approach to designing surface covers for tailings that can be applied under any site condition. The approach consists of three phases: (1) An assessment during which the degree of surface protection is determined. (2) A preliminary design that facilitates interaction with those designing other containment system elements. (3) A final design where the cost and effectiveness of the surface cover are determined. The types of information required to apply this approach are discussed

  6. Radiation protection on uranium mine and mill in China: past, present and future

    International Nuclear Information System (INIS)

    Li Xianjie; Wang Tingxue

    2009-01-01

    The future development of radiation protection on uranium mine and mill in China is discribed based on the history and existing state in China and the state of arts of radiation protection on uranium mine and mill in the world. (authors)

  7. Environmental assessment of remedial action at the Lakeview Uranium Mill Tailings Site, Lakeview, Oregon: Volume 2, Appendices

    International Nuclear Information System (INIS)

    1985-04-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Lakeview uranium mill tailings site located one mile north of Lakeview, Oregon. The site covers 256 acres and contains 30 acres of tailings, 69 acres of evaporation ponds, and 25 acres of windblown materials. Remedial actions must be performed in accordance with standards and with the concurrence of the Nuclear Regulatory Commission. Three alternatives have been addressed in this document. The first alternative (the proposed action) is relocation of all contaminated materials to the Collins Ranch site. The contaminated materials would be consolidated into an embankment constructed partially below grade and covered with radon protection and erosion protection covers. A second alternative would relocate the tailings to the Flynn Ranch site and dispose of the contaminated materials in a slightly below grade embankment. A radon protection and erosion protection cover system would also be installed. The no-action alternative is also assessed. Stabilization in place is not considered due to potential seismic and geothermal hazards associated with the current tailings site, and the inability to meet EPA standards. Volume 2 contains 11 appendices

  8. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  9. Humeca Uranium Mill. Nuclear Regulatory Commission's final environmental statement

    International Nuclear Information System (INIS)

    1976-04-01

    The Humeca Uranium Mill is a carbonate-leach uranium ore refining plant with a capacity of about 500 tons of ore per day. Although the present licensing action does not extend to mining, the statement considers the environmental impact of the combined mining and milling project to be conducted by Rio Algom Corporation. The environmental impact, including adverse and beneficial environmental effects of the Rio Algom Uranium Mill, is as follows. (1) Temporary (about 10 years) reassignment of use of about 120 acres of land out of the total 2,573 acres controlled by Rio Algom Corporation. (2) The removal of an estimated 8.4 million pounds of uranium concentrates as a natural resource. This material will eventually be used to produce approximately 6.09 x 10 6 megawatt-days of electricity. (3) Removal and diversion of approximately 100 gallons per minute of local groundwater. (4) Stimulation of the local economy through payment of taxes and direct employment of about 200 persons in San Juan County over the next 10 years. Rio Algom estimates they will pay out over $11 million in salaries over this period of time. (5) The creation of stabilized tailings piles covering about 45 acres involving approximately 1,850,000 tons of solids containing solidified waste chemical and radioactive uranium and its daughter products. (6) Discharge of small quantities of chemicals and radioactive materials (that are not expected to produce discernible effects) into the local environs

  10. Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

    Energy Technology Data Exchange (ETDEWEB)

    Nguyen, Jason [USDOE Office of Legacy Management (LM), Washington, DC (United States); Smith, Fred [Navarro Research and Engineering, Oak Ridge, TN (United States)

    2016-10-01

    This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of

  11. Cleaning up commingled uranium mill tailings: is Federal assistance necessary

    International Nuclear Information System (INIS)

    1979-01-01

    GAO was asked to determine whether Federal assistance should be given to operating mill owners that have processed uranium for sale to both government and industry and, thus, generated residual radioactive wastes. The wastes generated for both government and commercial use are called commingled uranium mill tailings. GAO recommends that the Congress provide assistance to active mill owners to share in the cost of cleaning up that portion of the tailings which were produced under Federal contract. Further, GAO believes that the Congress should also consider having the Federal government assist those mills who acted in good faith in meeting all legal requirements pertaining to controlling the mill tailings that were generated for commercial purposes and for which the Federal government is now requiring retroactive remedial action. At the same time, the Congress should make sure that this action establishes no precedent for the Federal government assuming the financial responsibility of cleaning up other non-Federal nuclear facilities and wastes, including those mill tailings generated after the date when the Federal government notified industry that the failings should be controlled

  12. Uranium Mill Tailings Remedial Action Amendments Act of 1988. Introduced in the Senate, One Hundredth Congress, Second Session, Report 100-543, September 23, 1988

    International Nuclear Information System (INIS)

    Anon.

    1988-01-01

    The Committee on Energy and Natural Resources reported favorably on the Uranium Mill Tailings Remedial Action Amendments Act of 1987 (S.1991) with some amendments, the principal one being to change the 1987 date to 1988. The purpose of this bill is to authorize the Secretary of the Interior to transfer lands under the jurisdiction of the Bureau of Land Management to the Department of Energy for permanent surveillance and maintenance of remediated mill tailings as required by the Uranium Mill Tailings Radiation Control Act of 1978. The bill also extends the authority of the Secretary of Energy to perform remedial action at designated uranium mill tailings sites and vicinity properties until 30 September 1994. The authority to perform groundwater restoration activities is extended without limitation

  13. Russian Experience in the Regulatory Supervision of the Uranium Legacy Sites - 12441

    Energy Technology Data Exchange (ETDEWEB)

    Kiselev, M.F.; Romanov, V.V. [Federal Medical Biological Agency, Moscow (Russian Federation); Shandala, N.K.; Titov, A.V.; Kiselev, S.M.; Seregin, V.A.; Metlyaev, E.G.; Novikova, N. [Burnasyan Federal Medical Biophysical Centre, Moscow (Russian Federation); Khokhlova, E.A. [Regional Management-107 under FMBA of Russia, Krasnokamensk (Russian Federation)

    2012-07-01

    Management of the uranium legacy is accompanied with environmental impact intensity of which depends on the amount of the waste generated, the extent of that waste localization and environmental spreading. The question is: how hazardous is such impact on the environment and human health? The criterion for safety assurance is adequate regulation of the uranium legacy. Since the establishment of the uranium industry, the well done regulatory system operates in the FMBA of Russia. Such system covers inter alia, the uranium legacy. This system includes the extent laboratory network of independent control and supervision, scientific researches, regulative practices. The current Russian normative and legal basis of the regulation and its application practice has a number of problems relating to the uranium legacy, connected firstly with the environmental remediation. To improve the regulatory system, the urgent tasks are: -To introduce the existing exposure situation into the national laws and standards in compliance with the ICRP system. - To develop criteria for site remediation and return, by stages, to uncontrolled uses. The similar criteria have been developed within the Russian-Norwegian cooperation for the purpose of remediation of the sites for temporary storage of SNF and RW. - To consider possibilities and methods of optimization for the remediation strategies under development. - To separate the special category - RW resulted from uranium ore mining and dressing. The current Russian RW classification is based on the waste subdivision in terms of the specific activities. Having in mind the new RW-specific law, we receive the opportunity to separate some special category - RW originated from the uranium mining and milling. Introduction of such category can simplify significantly the situation with management of waste of uranium mining and milling processes. Such approach is implemented in many countries and approved by IAEA. The category of 'RW originated

  14. Guide to the bioassay of uranium at uranium mine-mill facilities

    International Nuclear Information System (INIS)

    1981-01-01

    As a result of occupational exposure, uranium may be taken into the body by inhalation, ingestion or absorption through skin wounds. The organs at risk are the lung, kidney, and bones. Analysis of urine samples for uranium is recommended on a regular monthly basis, before and after a rest period, and it is suggested that a worker be removed from a working area if a level above 300 μg/l is found before a rest period, or 150 μg/l after a rest period. Background information on the development of a bioassay program is given, and a recommended program for uranium mine and mill facilities is included. (L.L.)

  15. Research on the characterization and conditioning of uranium mill tailings. III. Summary of uranium mill tailings conditioning research and implications regarding remedial actions

    International Nuclear Information System (INIS)

    Dreesen, D.R.; Cokal, E.J.; Thode, E.F.; Williams, J.M.

    1983-06-01

    This report summarizes the findings of research on uranium mill tailings conditioning technology development performed for the Department of Energy's (DOE) Uranium Mill Tailings Remedial Action Project (UMTRAP). Hazards and risks posed by tailings piles are discussed in relation to the goal of conditioning the tailings to reduce these hazards. The results of our efforts regarding characterization of tailings, removal of radionuclides, mineral recovery, thermal stabilization, and engineering/economic analysis of conditioning are presented. The implications of these results for remedial action plans are discussed and conclusions regarding the applicability of these technologies are also presented

  16. Physico chemical characterization of mill tailings and speciation studies of uranium a Jaduguda, India

    International Nuclear Information System (INIS)

    Sarjan Singh; Jha, V.N.; Sethy, N.K.; Rout, S.; Ravi, P.M.; Jha, S.K.; Tripathi, R.M.

    2018-01-01

    After recovery of economically viable portion of the ore remaining solid slurry or tailings from uranium ore processing industry is discharged into an engineered system called tailings pond. Among the radio-nuclides quantitative content of residual uranium is highest in the tailings pond and various environmental interactions such as precipitation, change in pH, redox potential, microbial activities, organic associations has a potential to fix (precipitate) or solubilise it. The chemical fractionation of 'U' in mill tailings of both operational and non operational tailing ponds of Jaduguda uranium mining and ore processing site has been part of present study. Also, the role of various physicochemical parameters (pH, Eh, TC etc) on the mobility of uranium has been investigated

  17. Experience Gained from the Former Uranium Ore Processing and the Remediation of the Legacy Site in Hungary

    Energy Technology Data Exchange (ETDEWEB)

    Csövári, M.; Földing, G.; Berta, Zs.; Németh, G., E-mail: csovarimihaly@mecsekoko.hu [MECSEK-ÖKO Zrt, Pécs (Hungary)

    2014-05-15

    Uranium explorations in Hungary started 1953. By 1957 the uranium ore reserves were confirmed and the feasibility of mining in the Mecsek Mountains demonstrated by opening the first shaft. In 1962 the mill was built. The mining and processing of the uranium ore were terminated in 1997 mainly on economical reasons. The remediation of the site has started immediately and had been practically finished in 2008. The paper summarises the remediation work, and some lessons learned from the former mill practice, and from the remediation activity. (author)

  18. Groundwater leaching of neutralized and untreated acid-leached uranium-mill tailings

    International Nuclear Information System (INIS)

    Gee, G.W.; Begej, C.W.; Campbell, A.C.; Sauter, N.N.; Opitz, B.E.; Sherwood, D.R.

    1981-01-01

    Tailings neutralization was examined to determine the effect of neutralization on contaminant release. Column leaching of acid extracted uranium mill tailings from Exxon Highland Mill, Wyoming, Pathfinder Gas Hills Mill, Wyoming, and the Dawn Midnite Mill, Washington, resulted in the flushing of high concentrations of salts in the first four pore volumes of leachate, followed by a steady decrease to the original groundwater salt concentrations. Neutralization decreased the concentration of salts and radionuclides leaching from the tailings and decreased the volume of solution required to return the solution to the groundwater pH and EC. Radium-226 and uranium-238 leached quickly from the tailings in the initial pore volumes of both neutralized and unneutralized tailings, and then decreased significantly. 6 figures, 5 tables

  19. Technico-economic analysis of uranium-mill-tailings conditioning alternatives

    International Nuclear Information System (INIS)

    Thode, E.F.; Dreesen, D.R.

    1981-01-01

    An analysis of practicable conditioning technologies for uranium mill tailings and their estimated costs has been conducted for two conditioning alternatives, thermal stabilization and leaching (sulfuric acid). Among the four high priority remedial action sites, Canonsburg, Pennsylvania, and Shiprock, New Mexico appear to be very good candidates for thermal stabilization. At Shiprock, thermal stabilization appears to be less expensive ($16.01/ton) than moving the pile more than five miles and covering with 15 feet of earth. At Canonsburg costs of other alternatives are not presently available. Given the radiological monitoring and protection expenses attendant upon moving these tailings in a highly populated area, it is likely that thermal stabilization, on site, at $41.25/ton would be an attractive remedial action approach. Cost data on the Salt Lake City, Utah site are presented for comparison purposes. Thermal stabilization is not favorable at this site because of high fuel and labor costs, as well as other factors. A conceptual design for a thermal stabilization operation is described. Sufficient information to assess the leaching alternative is available only for the Durango, Colorado site. Because of the large amount of vanadium and uranium in the pile, the income from the sale of these strategic minerals could pay for as much as 58% of the expense of removing, transporting, and covering the pile

  20. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site near Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-02-01

    The presence of contaminated uranium mill tailings adjacent to the city of Gunnison has been a local concern for many years. The following issues were identified during public meetings that were held by the DOE prior to distribution of an earlier version of this EA. Many of these issues will require mitigation. Groundwater contamination; in December 1989, a herd of 105 antelope were introduced in an area that includes the Landfill disposal site. There is concern that remedial action-related traffic in the area would result in antelope mortality. The proposed Tenderfoot Mountain haul road may restrict antelope access to their water supply; a second wildlife issue concerns the potential reduction in sage grouse use of breeding grounds (leks) and nesting habitat; the proposed Tenderfoot Mountain haul road would cross areas designated as wetlands by US Army Corps of Engineers (COE); the proposed disposal site is currently used for grazing by cattle six weeks a year in the spring. Additional concerns were stated in comments on a previous version of this EA. The proposed action is to consolidate and remove all contaminated materials associated with the Gunnison processing site to the Landfill disposal site six air miles east of Gunnison. All structures on the site (e.g., water tower, office buildings) were demolished in 1991. The debris is being stored on the site until it can be incorporated into the disposal cell at the disposal site. All contaminated materials would be trucked to the Landfill disposal site on a to-be-constructed haul road that crosses BLM-administered land