Sample records for important power constructions

  1. Advanced methods on the evaluation of design earthquake motions for important power constructions

    International Nuclear Information System (INIS)

    Higashi, Sadanori; Shiba, Yoshiaki; Sato, Hiroaki; Sato, Yusuke; Nakajima, Masato; Sakai, Michiya; Sato, Kiyotaka

    2009-01-01

    In this report, we compiled advanced methods on the evaluation of design earthquake motions for important power constructions such as nuclear power, thermal power, and hydroelectric power facilities. For the nuclear and hydroelectric power facilities, we developed an inversion method of broad-band (0.1-5Hz) source process and obtained valid results from applying the method to the 2007 Niigata-ken Chuetsu-oki earthquake (M6.8). We have also improved our modeling techniques of thick sedimentary layered structure such as the S-wave velocity modeling by using microtremor array measurement and the frequency dependent damping factor with a lower limit. For seismic isolation design for nuclear power facilities, we proposed a design pseudo-velocity response spectrum. For the thermal power facilities, we performed three-dimensional numerical simulation of Kanto Basin for a prediction relation of long-period ground motion. We also proposed the introduction of probabilistic approach into the deterministic evaluation flow of design earthquake motions and evaluated the effect of a great earthquake with a short return period on the seismic hazard in Miyagi Prefecture, Japan. (author)

  2. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  3. Strengthening of nuclear power plant construction safety management

    International Nuclear Information System (INIS)

    Yu Jun

    2012-01-01

    The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)

  4. A probabilistic model for US nuclear power construction times

    International Nuclear Information System (INIS)

    Shash, A.A.H.

    1988-01-01

    Construction time for nuclear power plants is an important element in planning for resources to meet future load demands. Analysis of actual versus estimated construction times for past US nuclear power plants indicates that utilities have continuously underestimated their power plants' construction durations. The analysis also indicates that the actual average construction time has been increasing upward, and the actual durations of power plants permitted to construct in the same year varied substantially. This study presents two probabilistic models for nuclear power construction time for use by the nuclear industry as estimating tool. The study also presents a detailed explanation of the factors that are responsible for increasing and varying nuclear power construction times. Observations on 91 complete nuclear units were involved in three interdependent analyses in the process of explanation and derivation of the probabilistic models. The historical data was first utilized in the data envelopment analysis (DEA) for the purpose of obtaining frontier index measures for project management achievement in building nuclear power plants

  5. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  6. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  7. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  8. Construction of special structures for nuclear power projects

    International Nuclear Information System (INIS)

    Raghavan, N.

    2003-01-01

    Construction is a very important stage in the course of realization of Nuclear Power Projects and as much care has be devoted to this stage as to the planning and engineering stages. While the setting up of nuclear power projects used to take over seven years in the past, the time period has now been considerably reduced to about five years with advancements in construction engineering, project management and design techniques, on the basis of new initiatives from the owner agency, Nuclear Power Corporation of India. In this article, the constructional aspects of the specialized structures for nuclear power generation are looked into. (author)

  9. Construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Jicha, J.

    1989-01-01

    The Temelin nuclear power plant with four WWER-1000 reactors is designed to supply electricity in an amount of 23 TWh/yr and heat in an amount of 8000 TJ/yr in the first stage. The maximum heat extraction should be 922 MW. The plant construction includes the building of 10 buildings, the total cost being 52 thousand million Czechoslovak crowns. Another 41 investment items are associated with the plant construction. The most important of them include constructions for leading out the electric power, for standby electricity supply for the power plant, and for the extraction of heat from the plant and its supply to the town of Ceske Budejovice. The first unit should be started up for test performance in November 1992, the second in 1994 and the whole power plant should be complete by 1998. The state of the construction by February 1989 is described in detail. Attention is also paid to the preparatory activity for the operation and to social welfare of the personnel. (Z.M.)

  10. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  11. Pipework in power plant construction

    International Nuclear Information System (INIS)

    Schwarzbach, K.

    1984-01-01

    With the development of conventional power plant construction to large unit sizes and because of the stringent safety requirements in nuclear poer stations, pipework installation has developed into a difficult operation closely inter-related with safety engineering. It is an important factor as far as completion dates and costs are concerned during the timely implementation of a subsequent construction phase which is characterized by high capital intensiveness. In order to keep both under control, prior planning and execution supported by electronic data processing are essential. (orig.) [de

  12. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  13. Nuclear power project construction quality acceptance standards Implementation and discussion

    International Nuclear Information System (INIS)

    Lai Shifu

    2013-01-01

    Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)

  14. [Risk communication in construction of new nuclear power plant].

    Science.gov (United States)

    He, Gui-Zhen; Lü, Yong-Long

    2013-03-01

    Accompanied by construction of new nuclear power plants in the coming decades in China, risk management has become increasingly politicized and contentious. Nuclear risk communication is a critical component in helping individuals prepare for, respond to, and recover from nuclear power emergencies. It was discussed that awareness of trust and public attitudes are important determinants in nuclear power risk communication and management. However, there is limited knowledge about how to best communicate with at-risk populations around nuclear power plant in China. To bridge this gap, this study presented the attitudinal data from a field survey in under-building Haiyang nuclear power plant, Shandong Province to measure public support for and opposition to the local construction of nuclear power plant. The paper discussed the structure of the communication process from a descriptive point of view, recognizing the importance of trust and understanding the information openness. The results showed that decision-making on nuclear power was dominated by a closed "iron nuclear triangle" of national governmental agencies, state-owned nuclear enterprises and scientific experts. Public participation and public access to information on nuclear constructions and assessments have been marginal and media was a key information source. As information on nuclear power and related risks is very restricted in China, Chinese citizens (51%) tend to choose the government as the most trustworthy source. More respondents took the negative attitudes toward nuclear power plant construction around home. It drew on studies about risk communication to develop some guidelines for successful risk communication. The conclusions have vast implications for how we approach risk management in the future. The findings should be of interest to state and local emergency managers, community-based organizations, public health researchers, and policy makers.

  15. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  16. Applicability of the 'constructional fire prevention for industrial plants' to power plants

    International Nuclear Information System (INIS)

    Hammacher, P.

    1978-01-01

    Power plants, especially nuclear power plants, are considered because of their high value and large construction volume to be among the most important industrial constructions of our time. They have a very exposed position from the point of view of fire prevention because of their constructional and operational concept. The efforts in the Federal Republic of Germany to standardize laws and regulations for fire prevention in industrial plants (industrial construction code, DIN 18230) must be supported if only because they would simplify the licensing procedure. However these regulations cannot be applied in many cases and especially in the main buildings of thermal power plants without restricting or even endangering the function or the safety of such plants. At the present state of the art many parts of the power plant can surely be defined as 'fire safe'. Fire endangered plant components and rooms are protected according to their importance by different measures (constructional measures, fire-fighting equipments, extractors for flue gases and for heat, fire-brigade of the plant). (orig.) [de

  17. Construction and application research of Three-dimensional digital power grid in Southwest China

    Science.gov (United States)

    Zhou, Yang; Zhou, Hong; You, Chuan; Jiang, Li; Xin, Weidong

    2018-01-01

    With the rapid development of Three-dimensional (3D) digital design technology in the field of power grid construction, the data foundation and technical means of 3D digital power grid construction approaches perfection. 3D digital power grid has gradually developed into an important part of power grid construction and management. In view of the complicated geological conditions in Southwest China and the difficulty in power grid construction and management, this paper is based on the data assets of Southwest power grid, and it aims at establishing a 3D digital power grid in Southwest China to provide effective support for power grid construction and operation management. This paper discusses the data architecture, technical architecture and system design and implementation process of the 3D digital power grid construction through teasing the key technology of 3D digital power grid. The application of power grid data assets management, transmission line corridor planning, geological hazards risk assessment, environmental impact assessment in 3D digital power grid are also discussed and analysed.

  18. Engineering development in nuclear power plant construction

    International Nuclear Information System (INIS)

    Guenther, P.

    1979-01-01

    Proceeding from the up-to-now experience in the erection of nuclear power stations, especially of the first and second unit of the Greifswald nuclear power plant, the following essential aspects of the development of constructional engineering are discussed: (1) constructional features and criteria, (2) organizational management, (3) current status and problems in prelimary operations, and (4) possibilities of further expenditure reductions in constructing nuclear power stations

  19. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  20. Power plant construction lead times: The value of contingency planning

    International Nuclear Information System (INIS)

    Rubin, L.J.

    1985-01-01

    In this paper an analysis of two different approaches to the construction of a major power plant (nuclear) is presented. The analysis compares an accelerated, ''go-for-broke'' strategy-which has some risk of being delayed-with a more deliberate contingency construction schedule in terms of revenue requirements and costs of electricity. It is demonstrated that under a wide variety of circumstances there are important advantages to the contingency strategy, but that the magnitude of those advantages is sensitive to the character of the power system being examined and to the flexibility of the contingency approach

  1. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    There is no single satisfactory way to measure productivity in the construction industry. The industry is too varied, too specialized and too dependent upon vast numbers of interrelations between trades, contractors, designers and owners. Hence, no universally reliable indices for measuring construction productivity has been developed. There are problems that are generic to all large union-built nuclear power plants. The actions of any one owner cannot rectify the shortcomings of the construction industry. The generic problems are being identified, and many national organizations are attempting to make the construction industry more productive by recommending various changes

  2. Improvement of design and construction technology in Japanese nuclear power plants

    International Nuclear Information System (INIS)

    Yomei Kato; Kiyoshi Shmizu

    1987-01-01

    Nuclear power generation currently offers economic merits superior to those of other methods dependant on such thermal power ganeration as petroleum, LNG, or coal. However, it is essential for the nuclear power generation continuously to retain economic superiority through concurently maintaining its high safety features and outstanding reliability. For achieving this purpose, taking into account of importance explained above, we have been developing and improving those of technologies such as design, engineering, and construction regarding the both field of management and techniques useful for plant construction. This paper covers the several instructive matters which Hitachi has accomplished throughout having had his hand in the project jobs. (author)

  3. Risk factors during construction of power plants using renewable energy sources

    Directory of Open Access Journals (Sweden)

    Nefedova Lyudmila Veniaminovna

    2016-12-01

    Full Text Available The authors consider main characteristics of modern development of renewable energy sources (RES. It is dedicated that there are some technical and economic barriers to the widespread use of renewable energy. For example, RES are inconstancy in time and space and have low density of energy flow. High capital intensity and cost price, long-term construction, a considerable degree of different kinds of risk, lack of competitiveness with hydrocarbon species generation in the existing regulatory environment are also inherent to RES. The role of the regulatory framework is shown according to perspective plans of construction of power plants using renewable energy sources. The main requirements which are applied to measures of state support of construction industry of renewable energy development are formulated. Current condition of construction industry of RES in Russia is assessed. The problems of risks which arise during construction of renewable energy facilities according to results of practical use of RES are discussed. And it is rather important to use stage assessment for the construction phase of the project during risk analysis of construction of alternative energy sources. The main groups of RES risks are described. The importance of regulatory and resource risks for effective development of renewable energy in Russia according to the method of strategic planning with the identification of the adverse effects of gradation factors are determined. The analysis of financial risks types and methods of its management during construction power generation projects based on different types of renewable energy resources are made. In the end of the article the authors make a conclusion, that the development of projects for the construction of power plants with the use of innovative technical solutions to ensure minimal risks to the environment and safe operation in various climatic conditions is a priority.

  4. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    This issue contains papers, which reflect the most important achievements of new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International Scientific and Technical Conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of Engineering Institutes of Islamic Countries (FEIIC). (author)

  5. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    International Nuclear Information System (INIS)

    Kim, Woojoong; Ryu, Dongsoo; Jung, Youngsoo

    2014-01-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation

  6. Application of linear scheduling method (LSM) for nuclear power plant (NPP) construction

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Woojoong, E-mail: minidung@nate.com [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Ryu, Dongsoo, E-mail: energyboy@khnp.co.kr [Central Research Institute, Korea Hydro and Nuclear Power Co., Ltd, Daejeon 305-343 (Korea, Republic of); Jung, Youngsoo, E-mail: yjung97@mju.ac.kr [College of Architecture, Myongji University, Yongin 449-728 (Korea, Republic of)

    2014-04-01

    Highlights: • Mixed use of linear scheduling method with traditional CPM is suggested for NPP. • A methodology for selecting promising areas for LSM application is proposed. • A case-study is conducted to validate the proposed LSM selection methodology. • A case-study of reducing NPP construction duration by using LSM is introduced. - Abstract: According to a forecast, global energy demand is expected to increase by 56% from 2010 to 2040 (EIA, 2013). The nuclear power plant construction market is also growing with sharper competition. In nuclear power plant construction, scheduling is one of the most important functions due to its large size and complexity. Therefore, it is crucial to incorporate the ‘distinct characteristics of construction commodities and the complex characteristics of scheduling techniques’ (Jung and Woo, 2004) when selecting appropriate schedule control methods for nuclear power plant construction. However, among various types of construction scheduling techniques, the traditional critical path method (CPM) has been used most frequently in real-world practice. In this context, the purpose of this paper is to examine the viability and effectiveness of linear scheduling method (LSM) applications for specific areas in nuclear power plant construction. In order to identify the criteria for selecting scheduling techniques, the characteristics of CPM and LSM were compared and analyzed first through a literature review. Distinct characteristics of nuclear power plant construction were then explored by using a case project in order to develop a methodology to select effective areas of LSM application to nuclear power plant construction. Finally, promising areas for actual LSM application are suggested based on the proposed evaluation criteria and the case project. Findings and practical implications are discussed for further implementation.

  7. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  8. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  9. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  10. High voltage power network construction

    CERN Document Server

    Harker, Keith

    2018-01-01

    This book examines the key requirements, considerations, complexities and constraints relevant to the task of high voltage power network construction, from design, finance, contracts and project management to installation and commissioning, with the aim of providing an overview of the holistic end to end construction task in a single volume.

  11. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  12. Power Grid Construction Project Portfolio Optimization Based on Bi-level programming model

    Science.gov (United States)

    Zhao, Erdong; Li, Shangqi

    2017-08-01

    As the main body of power grid operation, county-level power supply enterprises undertake an important emission to guarantee the security of power grid operation and safeguard social power using order. The optimization of grid construction projects has been a key issue of power supply capacity and service level of grid enterprises. According to the actual situation of power grid construction project optimization of county-level power enterprises, on the basis of qualitative analysis of the projects, this paper builds a Bi-level programming model based on quantitative analysis. The upper layer of the model is the target restriction of the optimal portfolio; the lower layer of the model is enterprises’ financial restrictions on the size of the enterprise project portfolio. Finally, using a real example to illustrate operation proceeding and the optimization result of the model. Through qualitative analysis and quantitative analysis, the bi-level programming model improves the accuracy and normative standardization of power grid enterprises projects.

  13. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  14. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  15. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    Science.gov (United States)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  16. The Importance of Reliable Nuclear Power For Energy Supply

    International Nuclear Information System (INIS)

    Blix, Hans

    1989-01-01

    The severe accident at Chernobyl in 1986 caused a setback in public acceptance of nuclear power practically everywhere in the world. In some countries, the media even give the impression that nuclear power is on the way out worldwide, because of concerns about safety, radioactive waste disposal, and the risk of proliferation of nuclear weapons. Let me give you a more accurate picture of the situation. At the beginning of this year there were about 430 nuclear power reactors in operation in 26 countries around the world and they produced more than 16% of the world's electric energy. That amount of electricity is equal to the total amount of electric energy that was produced in the world in 1956. I mention this because, when we concentrate on the problems which nuclear power is facing, we tend to forget that among all the major energy sources? coal, oil, gas, hydro and nuclear- it is nuclear which has experienced the fastest rise in relative importance for the global energy supply. Its contribution to global energy supply has increased from just under 1% in 1974 to about 5% in 1987. On the positive side we can note the continuation of strong nuclear power programmes with construction starts in France and Japan, the start of construction at Sizewell B, which marks a new departure for nuclear power in the United Kingdom, and the orders for the Korean units 11 and 12

  17. Problems and prospects of nuclear power plants construction

    Directory of Open Access Journals (Sweden)

    Pergamenshhik Boris Klimentyevich

    2014-02-01

    Full Text Available 60 years ago, in July 1954 in the city of Obninsk near Moscow the world's first nuclear power plant was commissioned with a capacity of 5 MW. Today more than 430 nuclear units with a total capacity of almost 375000 MW are in operation in dozens of the countries worldwide. 72 electrical power units are currently under construction, 8 of them are located in the Russian Federation. There will be no alternative to nuclear energy in the coming decades. Among the factors contributing to the construction of nuclear power plants reckon limited fossil fuel supply, lack of air and primarily carbon dioxide emissions. The holding back factors are breakdown, hazard, radioactive wastes, high construction costs and long construction period. Nuclear accidents in the power plant of «Three-Mile-Island» in the USA, in Chernobyl and in Japan have resulted in termination of construction projects and closure of several nuclear power plants in the Western Europe. The safety systems have become more complex, material consumption and construction costs have significantly increased. The success of modern competing projects like EPR-1600, AP1000, ABWR, national ones AES-2006 and VVER-TOI, as well as several others, depends not only on structural and configuration but also on construction and technological solutions. The increase of the construction term by one year leads to growth of estimated total costs by 3—10 %. The main improvement potentials include external plate reinforcement, pre-fabricated large-block assembly, production and installation of the equipment packages and other. One of the crucial success factors is highly skilled civil engineers training.

  18. Construction-man hour estimation for nuclear power plants

    International Nuclear Information System (INIS)

    Paek, J.H.

    1987-01-01

    This study centers on a statistical analysis of the preliminary construction time, main construction time, and total construction man hours of nuclear power plants. The use of these econometric techniques allows the major man hour driving variables to be identified through multivariate analysis of time-series data on over 80 United States nuclear power plants. The analysis made in this study provides a clearer picture of the dynamic changes that have occurred in the man hours of these plants when compared to engineering estimates of man hours, and produces a tool that can be used to project nuclear power plant man hours

  19. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  20. Risks and challenges associated with the design and construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-01-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  1. The technological construction of social power.

    NARCIS (Netherlands)

    Brey, Philip A.E.

    2007-01-01

    This essay presents a theory of the role of technology in the distribution and exercise of social power. The paper studies how technical artefacts and systems are used to construct, maintain or strengthen power relations between agents, whether individuals or groups, and how their introduction and

  2. Nuclear power plant containment construction

    International Nuclear Information System (INIS)

    Schabert, H.P.; Danisch, R.; Strickroth, E.

    1975-01-01

    The Nuclear Power Plant Containment Construction includes the spherical steel safety enclosure for the reactor and the equipment associated with the reactor and requiring this type of enclosure. This steel enclosure is externally structurally protected against accident by a concrete construction providing a foundation for the steel enclosure and having a cylindrical wall and a hemispherical dome, these parts being dimensioned to form an annular space surrounding the spherical steel enclosure, the latter and the concrete construction heretofore being concentrically arranged with respect to each other. In the disclosed construction the two parts are arranged with their vertical axis horizontally offset from each other so that opposite to the offsetting direction of the concrete construction a relatively large space is formed in the now asymmetrical annular space in which reactor auxiliary equipment not requiring enclosure by the steel containment vessel or safety enclosure, may be located outside of the steel containment vessel and inside of the concrete construction where it is structurally protected by the latter

  3. Simulation of power plant construction in competitive Korean electricity market

    International Nuclear Information System (INIS)

    Ahn, Nam Sung; Huh, Sung Chul

    2001-01-01

    power plant. Under these postulations, there is the potential for power plant construction to appear in waves causing alternating periods of over and under supply of electricity like commodity production or real estate construction. A computer model was developed to study the possibility that construction will appear in waves of boom and burst in Korean electricity market. This model was constructed using System Dynamics method pioneered by Forrester (MIT, 1961) and explained in recent text by Sternman (Business Dynamics, MIT, 2000) and the recent work by Andrew Ford (Energy Policy, 1999). This model was designed based on the Energy Policy results (Ford, 1999) with parameters for loads and resources in Korea. This Korea Market Model was developed and tested in a small scale project to demonstrate the usefulness of the System Dynamics approach, Korea electricity market is isolated and not allowed to import electricity from outsides. In this model, the base load such as nuclear and large coal power plant are assumed to be user specified investment and only CCGT is selected for new investiment by investors in the market. This model may be used to learn if government investment in new nuclear plants could compensate for the unstable actions of private developers. This model can be used to test the policy focused on the role of nuclear investments over time. This model also can be used to test whether the future power plant construction can meet the government targets for the mix of generating resources and to test whether to maintain stable price in the spot market

  4. A Study on Nonconformance and Construction Method Improvement for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jong Yeob; Roh, Myung Sub

    2014-01-01

    Advanced power reactor was developed by domestic technology, and finally exported to abroad. In order to place the current nuclear power industrial base, construction has played a big role. Without magnificent construction technology, it would have been impossible to get a safe nuclear power plant on time and in budget. Construction industry occupies very large portion of the economy in South Korea and it has been a core of South Korea's economic growth. With a competitive construction industry and advanced nuclear power plant construction know-how, South Korea could provide safe and reliable nuclear power plants in domestic and world. However there are many repairs and number of corrective actions are in actual construction. Thus, this paper suggested the result of nonconformance and construction method improvement for nuclear power plant. Constructional engineering is a kind of science that has a variety of disciplines including structure, geology, mechanical equipment and other fields. Thus, the development of constructional engineering is closely associated with experience from failure and application advanced construction method. The recent experience in nuclear power plants construction has shown that those improved methods are fully applicable and can help shorten the construction schedule. The future of nuclear power plant construction seems to be more encouraged, even though it has many obstacles

  5. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  6. Design And Construction Of 300W Audio Power Amplifier For Classroom

    Directory of Open Access Journals (Sweden)

    Shune Lei Aung

    2015-07-01

    Full Text Available Abstract This paper describes the design and construction of 300W audio power amplifier for classroom. In the construction of this amplifier microphone preamplifier tone preamplifier equalizer line amplifier output power amplifier and sound level indicator are included. The output power amplifier is designed as O.C.L system and constructed by using Class B among many types of amplifier classes. There are two types in O.C.L system quasi system and complementary system. Between them the complementary system is used in the construction of 300W audio power amplifier. The Multisim software is utilized for the construction of audio power amplifier.

  7. Power relations and reciprocity: dialectics of knowledge construction.

    Science.gov (United States)

    Ben-Ari, Adital; Enosh, Guy

    2013-03-01

    In this article we suggest a theoretical framework of knowledge construction by employing the concept of dialectics to power relationships between researcher and participants. Power distribution in research is perceived as dichotomous and asymmetrical in favor of the researcher, creating unequal power relations that make exploitation possible. Acknowledging such exploitation has led to a critical stance and attempts to bridge gaps through egalitarianism and empowerment of participants. Some scholars have focused on shifting expert knowledge differentials between researcher and participants throughout the research project. Others have evaluated such gaps as a source of knowledge construction. In the present work we applied a dialectical approach to understanding research relationships, suggesting reciprocity as their defining attribute, regardless of symmetry or asymmetry and as a source of knowledge construction. In this article we recommend avoiding a taken-for-granted attitude, because we see it as a direct obstacle to the construction of knowledge.

  8. The innovation and application of the nuclear power construction management information system MISNPC

    International Nuclear Information System (INIS)

    Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua

    2009-01-01

    This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)

  9. Construction times and the decommissioning of nuclear power plants

    International Nuclear Information System (INIS)

    Erramuspe, H.J.

    1988-01-01

    The construction and the decommissioning periods of nuclear power plants (NPP), are studied, due to their importance in the generation costs. With reference to the construction periods of these plants, a review is made of the situation and technical improvements made in different countries, with the purpose of shortening them. In regard to the decommissioning of NPP, the present and future situations are reviewed in connection with different stages of decommissioning and their related problems, as the residual radioactivity of different components, and the size of the final wastes to be disposed of. The possibilities of plant life extensions are also revised in connection with these problems. Finally, the expected decommissioning costs are analyzed. (Author) [es

  10. Improvement of QA/QC activities in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    Jinji Tomita; Shigetaka Tomaru

    1987-01-01

    Construction of commercial nuclear power plants in Japan started at around 1965. In this presentation are described quality assurance (QA) activities of a plant supplier who is a manufacturer of the key components as well. The QA activities until now are divided into several periods of the construction history in Japan. First term is 1960's when the QA activities are featured as the study and implementation through the construction of imported plants. Since then technologies and procedures of our own have been established and improved for the construction of high reliability plants. Our present QA activities are based on the active reflection of those lessons learned of past experiences. (author)

  11. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  12. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  13. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  14. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  15. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    International Nuclear Information System (INIS)

    Chen Heling; Zou Xiaoshun

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.)

  16. Quality assurance in the construction phase of the Guangdong Daya Bay Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Heling, Chen; Xiaoshun, Zou [Guangdong Nuclear Power Joint Venture Company (China)

    1994-11-01

    The quality assurance system of Guangdong Daya Bay Nuclear Power Plant during construction phase is briefly introduced. It includes the quality assurance organization and multiple quality control system of the owner (GNPJVC) and contractors. The status of the programmes implementation has been also described through presenting of some important quality assurance activities such as quality surveillance, QA audit and nonconformance control. In addition, the effectiveness of GNPP Construction QA Program has been analyzed and evaluated and both positive and negative experience have been summarized which could be used for reference by the nuclear power constructors. (6 figs.).

  17. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  18. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2010-05-15

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  19. A Study on the Approach to Quality Management in Construction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Pingish, Panupong; Choi, Kwang Sik

    2010-01-01

    The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system

  20. Construct ability Improvement for Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Dae Soo; Lee, Jong Rim; Kim, Jong Ku [Korea Electric Power Research Institute, Taejon (Korea, Republic of)

    1997-12-31

    The purpose of this study was to identify methods for improving the construct ability of nuclear power plants. This study reviewed several references of current construction practices of domestic and overseas nuclear plants in order to identify potential methods for improving construct ability. The identified methods for improving construct ability were then evaluated based on the applicability to domestic nuclear plant construction. The selected methods are expected to reduce the construction period, improve the quality of construction, cost, safety, and productivity. Selection of which methods should be implemented will require further evaluation of construction modifications, design changes, contract revisions. Among construction methods studied, platform construction methods can be applied through construction sequence modification without significant design changes, and Over the Top construction method of the NSSS, automatic welding of RCL pipes, CLP modularization, etc., are considered to be applied after design modification and adjustment of material lead time. (author). 49 refs., figs., tabs.

  1. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  2. Construction of overseas nuclear power plants for first time by Japanese industry

    International Nuclear Information System (INIS)

    Maruyama, Tohru; Naruse, Yoshihiro; Yabuta, Hitoshi

    2010-01-01

    In response to the worldwide demand for stable energy supplies and the reduction of greenhouse gas emissions, nuclear power plant construction projects have been expanding on a global scale. Even in the United States, where no nuclear power plants have been constructed over the past 30 years, there are plans for the construction of more than 30 plants. Toshiba has been awarded a contract for a nuclear power plant construction project in the U.S., the first case of overseas nuclear power plant construction by Japanese industry. Toshiba America Nuclear Energy Corporation (TANE), the first U.S. subsidiary in our nuclear business, located in Charlotte, North Carolina, is engaged in this globally prominent project, applying various technologies and know-how that we have cultivated over many years of experience in developing and constructing nuclear power plants in Japan and adapting them to U.S. business practices, laws, and regulations. (author)

  3. Geodesy problems in nuclear power plant construction

    International Nuclear Information System (INIS)

    Eory, K.

    1981-01-01

    The special geodetic problems encountered during the construction of the Paks nuclear power plants are treated. The main building with its hermetically connected components including the reactor, the steam generators, the circulation pumps etc. impose special requirements on the control net of datum points. The geodesy tasks solved during the construction of the main building are presented in details. (R.P.)

  4. Improved monolithic reinforced concrete construction for nuclear power stations

    International Nuclear Information System (INIS)

    Guenther, P.; Fischer, K.

    1983-01-01

    Experience has shown that in applying monolithic reinforced concrete in nuclear power plant construction the following auxiliary means are useful: measuring sheets in assembling, welding gauges for reaching high tolerance accuracies of prefabricated reinforced concrete members, suitable lining materials, formwork anchorage and formwork release agents, concrete workability agents, mechanized procedures for finishing and assembling. These means were successfully tested in constructing the Greifswald nuclear power station

  5. Constructing (IlLegitimate Democracy: Populism and Power Concentration in Newspaper Discourse on Venezuela

    Directory of Open Access Journals (Sweden)

    Ernesto Abalo

    2014-10-01

    Full Text Available Despite scholarly consensus about the importance of the media for democracy, scant attention has been paid to what democracy means to journalistic discourse and how discourses on democracy are interrelated with legitimacy. The aim of this paper is to explore how (illegitimate democracy is constructed in newspaper discourse. By using critical discourse analysis, this paper examines foreign news items about Venezuela, a country that under the presidency of Hugo Chávez has challenged the hegemonic global political and economic orders. The analysis section focuses on two main findings about the Venezuelan government: the constructions of populism and power concentration, which serve to mark deviance from what is perceived as legitimate democracy. This paper argues that a liberal perception of democracy constitutes a central framework for the construction of (illegitimate democracy, which is revealed not least by news discourse’s focus on what is morally unacceptable political conduct according to liberal democratic norms. In this sense, such constructions serve to denounce potential governmental power abuses but also to legitimize the hegemonic economic and political orders.

  6. Design and construction of tetrode tube modulator for high power electron accelerator

    Directory of Open Access Journals (Sweden)

    A M Poursaleh

    2015-09-01

    Full Text Available In this paper, a high power tetrode tube (TH781-200kW, cw modulator is designed and implemented. This modulator is used for a part of RF system of the first Iranian high power electron accelerator project with similar structure to Rhodotron accelerator. Regarding to the level of sensitive and importance of TH781 tube the modulator system designed with high accuracy. So beside of power supplies design the control circuits for protection of the tube have been considered. The results of test and operation of this system that have been constructed in Iran for fist time is very satisfactory

  7. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  8. Modularization Technology in Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Kouichi Murayama; Miki Yoshida; Junichi Kawahata

    2002-01-01

    Since the early 1980's, Hitachi has been developing and applying modularization technology to domestic nuclear power plant construction, and has achieved great rationalization. Modularization is one of the plant construction techniques which enables us to reduce site labor by pre-assembling components like equipment, pipes, valves and platforms in congested areas and installing them using large capacity cranes for cost reduction, better quality, safety improvement and shortening of construction time. In this paper, Hitachi's modularization technologies are described especially from with respect to their sophisticated design capabilities. The application of 3D-CAD at the detailed layout design stage, concurrent design environment achieved by the computer network, module design quantity control and the management system are described. (authors)

  9. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H; Ito, M; Sakata, M [The Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  10. Construction of APR1000 nuclear power information management system based on international standards

    International Nuclear Information System (INIS)

    Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang

    2010-01-01

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  11. Construction of APR1000 nuclear power information management system based on international standards

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)

    2010-10-15

    In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model

  12. Import of electric power increased by 19 %

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The import of electric power increased by 19% in 1999. Due to the decrease in the electric power export the net import of electric power increased even more. Electric power import from Sweden was 6000 GWh, import from Russia 5200 GWh and import from Norway 100 GWh. The electric power export in 1999 was only 200 GWh. The generation of nuclear power increased 5% and the consumption of wood-based fuels by 3%. The increase in nuclear power generation is based on increment of the power output capacities of the power plants. The consumption of peat decreased by 12% and the production of hydroelectric power by 15%. The decrement of the peat consumption is based on the changes in energy taxation. The production of hydroelectric power decreased to the normal level after the rainy year 1998. Oil consumption remained nearly the same as in 1998 even though the national product increased in 1999 by 3.5%. The wind power generation was doubled in 1999. The share of it is still only about 0.01% of the total energy consumption. Carbon dioxide emissions from coal and peat, decreased by 1.0 million tons, down to 56 million tons. The present emissions are now only about 2 million tons higher than during the reference year 1990. The emissions have decreased by 5 million tons since 1996 when they were at their highest

  13. Important statistics on engineering and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Budwani, R.N.

    1976-01-01

    During the past seven years, a study was made of the engineering and craft manpower/manhour requirements, craft breakdowns by totals and peaks, material requirements, unit man-hours, rate of manhour/capital expenditures, and schedule requirements of representative nuclear power plants across the United States. The study is based on information received from electric utilities, engineer-constructors, site visits, the Nuclear Regulatory Commission (NRC), personal contacts, and the exchange of information with knowledgeable people. Preliminary data in the form of tables and figures are presented. Factors which have and will influence manpower, manhours, material requirements, building volumes, and schedules are outlined, and a list of recommendations is presented. The objective of this study has been to show in a concise fashion what the trend has been and what may be anticipated for future nuclear power plants

  14. Quality assurance in the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Bernsen, S.A.

    1975-01-01

    A general survey of quality-assurance (QA) practices as they relate to the construction phase of nuclear power plants is presented. The article briefly outlines the evolution of construction QA requirements, describes construction practices and organizational relations that help identify the unique construction-phase features that affect QA practices, identifies some of the principal requirements and programmatic problems involving construction, and discusses potential trends and suggested guidelines for the implementation of particular practices. (U.S.)

  15. Study on nuclear power plant project construction and management mode in China

    International Nuclear Information System (INIS)

    Wang Kai; Chen Lian

    2009-01-01

    Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)

  16. International comparison of economic and technical indexes of nuclear power plant construction

    International Nuclear Information System (INIS)

    Majer, P.; Fialova, H.

    1988-01-01

    The comparison of capital costs of the construction of nuclear power plants takes into consideration the following aspects: the delineation of the installation, the determination of costs and their break-down, the impact of the time factor, the conversion of the costs to a comparable unit. Power plants are always compared with roughly the same power capacity, this even when conditions for construction are not fully comparable. Construction costs may be divided into, e.g., pre-construction costs, direct capital costs, indirect capital costs, interest during construction. The time factor is manifest in the duration of construction and in the concrete year of construction for which the comparison is being made. The inflationary rise in prices and interests are increasing capital costs by roughly 5 - 8% per annum. The comparison of costs expressed in different currencies is made either by conversion using the rate of exchange or by comparing the time expended for the construction of the power plant. Various methods of comparison are discussed. (J.B.). 7 refs

  17. Special issue on start of construction of the Ohma nuclear power plant of J-Power

    International Nuclear Information System (INIS)

    Takahashi, Taizo

    2008-01-01

    The Electric Power Development Co., Ltd. (J-Power) started construction of its Ohma nuclear power plant - a 1383 MWe Advanced Boiling Water Reactor (ABWR) - in Aomori prefecture on May 2008. The reactor of the Ohma plant will be the first to load MOX fuels in all of its reactor cores. It will be able to consume a quarter of all the recycled MOX fuels produced at Rokkasho reprocessing plant and hence make a major contribution to Japan's policy of recycling plutonium recovered from spent fuels. Special issue reviewed history and overview of the Ohma plant as well as its significance to enhance power generation portfolio in corresponding with national interests. Local governor's expectations and present state of the Ohma plant were also described. After preparation works, construction began on excavation of foundation for the service building, proceeding as always with safety the foremost priority during construction. (T. Tanaka)

  18. Risk Evaluation on UHV Power Transmission Construction Project Based on AHP and FCE Method

    OpenAIRE

    Huiru Zhao; Sen Guo

    2014-01-01

    Ultra high voltage (UHV) power transmission construction project is a high-tech power grid construction project which faces many risks and uncertainty. Identifying the risk of UHV power transmission construction project can help mitigate the risk loss and promote the smooth construction. The risk evaluation on “Zhejiang-Fuzhou” UHV power transmission construction project was performed based on analytic hierarchy process (AHP) and fuzzy comprehensive evaluation (FCE) method in this paper. Afte...

  19. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  20. Preassembly method for construction of nuclear power station

    International Nuclear Information System (INIS)

    Shimazaki, Yasuyoshi

    1986-01-01

    Recently preassembly method for construction are generally popular in Japan and this trend is prevailing all over the world. They provide good solutions to the problems that the Japanese construction industry faces and also they meet the needs for construction of nuclear power plants having heavily reinforced concrete structures. We have already established basic technologies for the methods, developing more advanced methods (more systematic, larger sized, more applicable, etc.). In the near future, they will be further developed up to a complete system called 'Industrialized construction method'. This system will include the use of precast concrete component, steel concrete composit structures and construction robots. (author)

  1. Rationalizing of construction engineering of nuclear power plants with pressurized water reactors

    International Nuclear Information System (INIS)

    Schmidt, S.

    1977-01-01

    Construction of large power plants requires further reduction of construction efforts and the construction period. A new constructional and technological solution has been developed with the steel-cell composite structure applied in the Greifswald nuclear power plant 'Bruno Leuschner' for the first time. Principles of design, fabrication, transport, and mounting are described. The benefits of the method are indicated. (author)

  2. The supply chain of civil construction industries for support the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana; Moch-Djoko Birmano; Sahala Lumbanraja; Nurlaila

    2013-01-01

    The use of domestic products for electricity infrastructure has been set out in the Ministerial Decree number: 54/M-IND/PER/3/2012, but the infrastructure of nuclear power plants (NPP) construction has not been included. Therefore, the potential of the local industries needs to be mapped it especially supply chain of civil construction industries to estimate the capability of the local component level (DCL) at the nuclear power plant project in Indonesia. NPP is a high-technology so that if NPP will be constructed, it is necessary to involve the national capability as media technology transfer, especially for EPC (Engineering, Procurement and Construction) services. Civil construction (civil part) play role is very large, about 21%. Therefore it is necessary in particular the role of the national civil construction industry to increase the capability of local content. Preparation of Civil construction infrastructure are depend on the supply chain of raw materials. The aim of the research was to map the supply chain of the civil construction industries. Methodology this study is a survey of national industries, literature review, and searching web site. The result study is a map of civil construction industries with raw material supply chain. (author)

  3. The importance of nuclear power to energy supply in Switzerland

    International Nuclear Information System (INIS)

    Kiener, E.

    2001-01-01

    The use of nuclear power is a matter of dispute also in Switzerland. The first opposition to plans for the Kaiseraugst nuclear power station near Basel sprang up in the seventies. In Switzerland, referenda are a popular expression of political disputes. On a federal level, a total of six referenda have been conducted about nuclear power since 1979. As a rule, antinuclear projects were rejected by a slim majority, except for the 1990 moratorium initiative. As a consequence, there was a ten-year ban on the construction of new nuclear power plants. Despite efforts by many parties it was not possible to develop a general consensus on an energy supply strategy. Because of the considerable importance to the power economy, and the economy at large, of nuclear power in Switzerland, where the five nuclear power plants in operation generate approx. 38% of the country's electricity, while 58% is produced in hydroelectric plants, a new Nuclear Power Act was adopted by Parliament in late February 2001. It constitutes the framework for the continued safe operation of nuclear power plants, keeps the nuclear option open for future planning, and handles spent fuel and waste management, final storage, and decommissioning. Also possible international solutions of final storage outside of Switzerland are taken into account. In this way, the Swiss government and parliament have advocated the continued use of nuclear power as one element of energy supply. (orig.) [de

  4. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  5. Quality control during construction of power plants

    International Nuclear Information System (INIS)

    Hartstern, R.F.

    1982-01-01

    This paper traces the background and examines the necessity for a program to control quality during the construction phase of a power plant. It also attempts to point out considerations for making these programs cost effective

  6. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  7. Application of ABWR construction database to nuclear power plant project

    International Nuclear Information System (INIS)

    Takashima, Atsushi; Katsube, Yasuhiko

    1999-01-01

    Tokyo Electric Power Company (TEPCO) completed the construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and No. 7 (K-6/7) as the first advanced boiling water reactors (ABWR) in the world successfully. K-6 and K-7 started their commercial operations in November, 1996 and in July, 1997 respectively. We consider ABWR as a standard BWR in the world as well as in Japan because ABWR is highly reputed. However, because the interval of our nuclear power plant construction is going to be longer, our engineering level on plant construction will be declining. Hence it is necessary for us to maintain our engineering level. In addition to this circumstance, we are planning to wide application of separated purchase orders for further cost reduction. Also there is an expectation for our contribution to ABWR plant constructions overseas. As facing these circumstances, we have developed a construction database based on our experience for ABWR construction. As the first step of developing the database for these use, we analyzed our own activities in the previous ABWR construction. Through this analysis, we could define activity units of which the project consists. As the second step, we clarified the data which are treated in each activity unit and the interface among them. By taking these steps, we could develop our database efficiently. (author)

  8. Application and development analysis of nuclear power plant modular construction

    International Nuclear Information System (INIS)

    Fang Xiaopeng

    2015-01-01

    Modular Construction is currently one of the major development trends for the nuclear power plant construction technology worldwide. In the first-of-a-kind AP1000 Nuclear Power Project practiced in China, the large-scale structural modules and mechanical modules have been successfully fabricated, assembled and installed. However, in the construction practice of the project, some quality issues are identified with the assembly and installation process of large-scale structural modules in addition to the issue of incomplete supply of mechanical modules, which has failed to fully demonstrate the features and merits of modular construction. This paper collects and consolidates the issues of modular construction of AP1000 first of a kind reactor, providing root cause analysis in the aspects of process design, quality control, site construction logic, interface management in the process of module fabrication, assembly and installation; modular construction feasibility assessment index is proved based on the quantification and qualitative analysis of the impact element. Based on the modular construction feasibility, NPP modular construction improvement suggestions are provided in the aspect of modular assembly optimization definition, tolerance control during the fitting process and the construction logic adjustment. (author)

  9. Discussion on several important safety requirements for the new nuclear power plant

    International Nuclear Information System (INIS)

    Yan Tianwen; Li Jigen; Zhang Lin; Feng Youcai; Jia Xiang; Li Wenhong

    2013-01-01

    Post the Fukushima nuclear accident, the Chinese government raised higher safety goals and safety requirements for the new nuclear power plant to be constructed. The paper expounded the important indicators of safety requirements and the aspects of safety modification that had been developed for the new NPPs. It also discussed and analyzed the main fields required by the new NPPs safety requirements in the safety goals, safety evaluation of sites, defenses of internal and external events, severe accident prevention and mitigation, design of reactor core, containment system and I and C system, and optimization of engineering measure, which gave some references to the design, construction and safety modifications of new NPPs in China. (authors)

  10. Power import or domestic power generation using gas?

    International Nuclear Information System (INIS)

    Saettler, M.; Bohnenschaefer, W.; Schlesinger, M.

    2001-01-01

    This report for the Swiss Federal Office of Energy (SFOE) presents expert opinion on the question of how Switzerland could meet its demands for power in the future. The results of the analysis of two options - the import of electrical power or its generation using natural-gas-fired power stations - made in the light of gas market liberalisation are presented. These include the assessment of the use of 'GuD' (combined gas and steam-turbine) power stations in the 100 MW e l to 400 MW e l class regarding their cost, their emissions and primary energy consumption. The authors discuss the assessments from the political and economic points of view. An appendix supplies characteristic data for 'GuD' power stations and an example of a model calculation for a 400 MW e l 'GuD' power station

  11. A study of public acceptance of construction of atomic power plant

    International Nuclear Information System (INIS)

    Harada, Kazunori; Matsuhashi, Ryuji; Yoshida, Yoshikuni

    2011-01-01

    In June 2010, Basic Energy Plan was approved in a Cabinet meeting. It says that Japan aims to construct more than 14 atomic power plants by 2030. Today, there are 12 plans of construction of atomic power plant, but it is hard to say that their plans easily come off. That's because public acceptance of atomic power plant is low in Japan, for example local residents wage opposition campaigns. This study conducts a survey in the form of a questionnaire and analyzes it by Analytical Hierarchical Process (AHP). Analytic Hierarchy Process is a structured technique for dealing with complex decisions. A questionnaire using AHP is very easy to answer and analyze. This survey was conducted in 2 areas. First area is Hohoku-cho, Yamaguchi Pref. that had a plan of construction of atomic power plant and the plan was demolished by opposition campaigns. Second area is Kaminoseki-cho, Yamaguchi Pref. that has a plan of construction of atomic power plant now and the plan is working order. Public acceptance can be calculated from survey data of 2 areas, and it helps to understand why first area disapproved a plan of atomic power plant and second area approves it. We consider a model to analyze public acceptance. (author)

  12. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  13. The construction of a PWR power station reactor building liner

    International Nuclear Information System (INIS)

    Skirving, N.; Goulding, J.S.; Gibson, J.A.

    1991-01-01

    Cleveland Bridge and Engineering Co Ltd (CBE) are constructing the Reactor Building Liner Plate containment of the Sizewell 'B' Power Station for Nuclear Electric Ltd. This has entailed extensive offsite prefabrication of components and their subsequent erection at Sizewell. It has been necessary to engineer temporary supporting mechanisms to enable manufacture and erection to proceed, yet also to withstand wet concrete forces during the progressive construction. The Reactor Building Liner Plate is a safety related system and as such, in addition to strict compliance with the ASME code, the Quality Assurance (QA) requirements of BS 5882 are applicable. A dedicated Project Team was established by CBE to control and direct the work. Equally important as satisfying the rigorous Q.A. requirements has been the need to meet programme and budget. This paper details CBE execution of the Project. (author)

  14. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  15. Delays in nuclear power plant construction. Volume II. Final report

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.; Borcherding, J.D.; Okes, S.R. Jr.; Rad, P.F.

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  16. Delays in nuclear power plant construction. Volume I. Final report

    International Nuclear Information System (INIS)

    1977-01-01

    The report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts which should minimize or eliminate the identified barriers. The identified barriers include: (1) Design and Construction Interfacing Problems; (2) Problems Relating to the Selection and Use of Permanent Materials and Construction Methods; (3) Construction Coordination and Communication Problems; and (4) Problems Associated with Manpower Availability and Productivity

  17. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  18. Role of civil engineers in design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Sivathanu Pillai, C.

    2015-01-01

    Nuclear energy remains an important element in India's energy mix for sustaining rapid economic growth. In the Indian energy scenario projections for the future, nuclear power through fast reactors has been considered as an important component. Fast reactors are also planned to be built in the medium term to burn minor actinides as means of reducing the burden of radioactive waste management. Nuclear power in India provides 3% of the electricity generated in the country now; it is estimated to go up to 25% by 2050. India has a special interest in developing fast breeder reactors and use of thorium as a source of energy as it has one of the largest reserves of thorium. Nuclear industry always provides challenging works to civil engineers. From geotechnical investigation, structural analysis, design, construction and to material developments and provides unique opportunity for excellence

  19. Notes on organization of nuclear power station construction

    International Nuclear Information System (INIS)

    Marsicanin, B.

    1977-01-01

    After a visite to some european nuclear power stations under construction and in operation, in this report a short general view on this subject is given. The progress in this in large, industrialised countries is considered as well as the relevant experience in developing countries. The new role of nuclear research institutes during construction and operation is pointed out and prospects of this cooperation evaluated. (author)

  20. Construction works of large scale impervious wall in construction of No.2 plant in Onagawa Nuclear Power Station, Tohoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ueda, Kozaburo; Sugeno, Yoshisada; Takahashi, Hitoshi

    1991-01-01

    The main buildings for No. 2 plant in Onagawa Nuclear Power Station are constructed on the bedrocks about 14 m below the sea surface. Therefore, for the purpose of executing the works by shutting seawater off and dry work, the large scale impervious wall of about 500 m extension was installed underground. The feature of this impervious wall is the depth of embedment of about 3 m into the hard bedrocks having the uniaxial compressive strength of 2000 kg/cm 2 at maximum, carried out with the newly developed hard rock excavator. The outline of these construction works is reported. No. 2 plant in Onagawa Nuclear Power Station is the BWR plant of 825 MWe output. The construction works of the power station were began in August, 1989, and the rate of progress in civil engineering works as of the end of September, 1990 was 21.3%. The planning of the impervious wall, the geological features at the site, the method of shutting seawater off, the selection of wall materials, the design of the wall body, the investigation of the quantity of spring water, the execution of the construction and execution management, and the confirmation of the effect of the wall are reported. (K.I.)

  1. Economics of power generation from imported biomass

    International Nuclear Information System (INIS)

    Lako, P.; Van Rooijen, S.N.M.

    1998-02-01

    Attention is paid to the economics of import of biomass to the Netherlands, and subsequent utilisation for power generation, as a means to reduce dependence on (imported) fossil fuels and to reduce CO2 emission. Import of wood to the extent of 40 PJ or more from Baltic and South American states seems to be readily achievable. Import of biomass has various advantages, not only for the European Union (reduced CO2 emissions) but also for the countries of origin (employment creation). However, possible disadvantages or risks should be taken into account. With that in mind, import of biomass from Baltic states seems very interesting, although it should be noted that in some of those countries the alternative of fuel-switching to biomass seems to be more cost-effective than import of biomass from those countries. Given the expected increase in inland biomass consumption in the Baltic countries and the potential substantial future demand for biomass in other Western European countries it is expected that the biomass supply from Baltic countries will not be sufficient to fulfill the demand. An early focus on import from other countries seems advisable. Several power generation options are available with short to medium term potential and long term potential. The margin between costs of biomass-fuelled power and of coal fired power will be smaller, due to substantial improvements in power generating efficiency and reductions of investment costs of options for power generation from biomass, notably Biomass Gasification Combined Cycle. 18 refs

  2. Testing in power plant construction as well as in the petrochemical and chemical industry

    International Nuclear Information System (INIS)

    Riess, N.; Schittko, H.

    1978-01-01

    In general, the upgrading of requirements for the most different fields of engineering is also characterized by a corresponding effort in testing. In this context especially nondestructive tests of materials are of outstanding importance. In the fields of power plant construction (among others, components for nuclear power plants) as well as petrochemical and chemical industry considered here, almost all nondestructive test methods are applied. This paper discusses not so much theoretical testing problems, but rather test objects as well as specifications and testing equipment. (orig./HP) [de

  3. Wind Power Plants Fundamentals, Design, Construction and Operation

    CERN Document Server

    Twele, Jochen

    2012-01-01

    Wind power plants teaches the physical foundations of usage of Wind Power. It includes the areas like Construction of Wind Power Plants, Design, Development of Production Series, Control, and discusses the dynamic forces acting on the systems as well as the power conversion and its connection to the distribution system. The book is written for graduate students, practitioners and inquisitive readers of any kind. It is based on lectures held at several universities. Its German version it already is the standard text book for courses on Wind Energy Engineering but serves also as reference for practising engineers.

  4. A nuclear power enterprise debt management system construction Based on Sanmen Nuclear Power Co., LTD, debt risk management case analysis

    International Nuclear Information System (INIS)

    Wu Yan; Liu Shuqing

    2010-01-01

    Building nuclear power enterprises need huge investment , often tens of billions RMB. How to do a good job in corporate debt risk management, becoming powerful large-scale development of nuclear power ,ensuring the supply of funds and existing debt service in the process of large-scale development of nuclear power ,is an important task. In this paper, managing the company's debt is very urgent and necessary through analysis of SMNPC financing and debt structure; through the analysis of SMNPC's debt risk management , the authors would like to explore how to build up the framework of the debt management under the large-scale development of nuclear power construction . Nuclear power enterprises need to strengthen supervision mechanism and internal control,build-up and perfect all-round debt risk manage system, keep watch on debt risk in order to ensure preservation and increment of the value of state assets. (authors)

  5. Design and construction of nuclear power plants

    CERN Document Server

    Schnell, Jürgen; Meiswinkel, Rüdiger; Bergmeister, Konrad; Fingerloos, Frank; Wörner, Johann-Dietrich

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply.Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overv

  6. Power supply for the Spanish stellarator TJ-II, design, construction, and tests

    Energy Technology Data Exchange (ETDEWEB)

    Perez, A.; Lucia, C.; Alberdi, B.; Del Rio, J.M. [JEMA SA, Lasarte-Oria (Spain); Almoguera, L.; Blaumoser, M.; Kirpitchev, I.; Mendez, P. [Asociacion EURATOM-CIEMAT para Fusion, Madrid (Spain)

    1995-12-31

    Most of the components of the electrical power supply system of the new TJ-II stellarator, which is under construction in Madrid (Spain), are now constructed and tested. The flywheel synchronous generator is still under construction and its tests are planned for the end of 1995. The power plant is described in detail as well as the tests which have been carried out and their results.

  7. Main problems of increasing labour productivity in the power plant construction

    International Nuclear Information System (INIS)

    Falaleev, P.P.

    1984-01-01

    The reserve for labour productivity growth in power-, industrial- and civil engineering in the USSR Minenergo system are discussed. Such reserve comprises: introduction of effective designs, increase of technological readiness of structures; a higher mechanization level in construction, improvement of industrial organization, economical and social aspects. Decrease of labour inputs in NPP construction will be attained by using unified designs of serial WWER-1000, RBMK-1000- and RBMK-1500 reactors as well as by developing nuclear power construction complexes-industrial-construction enterprises for manufacturing and transport of special structures as well as for performing civil engineering and installation work on the ground part of the reactor building and special structure. Other potentialities for increasing labour productivity in NPP construction are considered

  8. Development of new construction technologies for nuclear power plant

    International Nuclear Information System (INIS)

    Kawamata, Susumu; Itoh, Daisuke; Ichizono, Katsuyuki

    1995-01-01

    In order to proceed rationally with the construction of a nuclear power station, the followings are the subject to solve beside reducing the construction cost: shortening the construction period, improving the quality, and securing safety in the construction work. As a measure to solve the matters, we correctly construct the plant mainly applying 'all-weather proof construction method' and 'pre-assembled large-block construction method'. Furthermore, as the plant construction control system, we perform a construction work applying the design change management system, pre-assessment for safety, and the whole facility check. As a result of our effort, it was attained that when we compare the matured plant with the first unit, the construction cost is reduced by 30%, the construction period is shortened by 12 months, site manpower is decreased by 30%, and the plant had no sudden shutdowns even during the trial operation period. (author)

  9. Beyond Design: The Importance of Construction and Post-Construction Phases in Green Developments

    Directory of Open Access Journals (Sweden)

    Mark Hostetler

    2010-04-01

    Full Text Available Green developments are becoming a popular land use planning concept that attempts to accommodate growth while minimizing impacts on natural resources. Various policies encourage conservation designs that usually translate into the clustering of homes and the conservation of some percentage of open space. However, the success of a design is determined by what happens during the construction and post-construction phases of a subdivision project. These two phases are often ignored in land use planning and given only minimal attention by built environment professionals. As a result, green developments may not be functioning as originally intended. This essay discusses the importance of construction and post-construction and a way forward to create functional, sustainable communities. Construction activities and decisions, such as impacts from earthwork machines, improper protection of conserved open spaces and trees, the choice of plants used for yards and common areas, and the storage of construction material all can lead to severe impacts on natural areas both within and surrounding a development site. During post-construction, a variety of improper management practices by homeowners can compromise the sustainability of a development. Developers and associated environmental consultant teams could implement approaches that would engage contractors and residents, such as environmental construction covenants and the installment of a neighborhood, environmental education program. To increase the adoption of relevant construction and post-construction practices, appropriate policies need to be created. However, the shift will only occur once the planning and built environment community acknowledges that design is only the first step towards sustainability. Academic design studios and continuing education courses can help with this culture shift by including construction and post-construction considerations within their curriculum.

  10. Application of RFID to High-Reliability Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Masayuki Ishiwata; Kenji Araki; Jun-ichi Kawahata

    2006-01-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  11. Application of RFID to High-Reliability Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Akagi, Kenji; Ishiwata, Masayuki; Araki, Kenji; Kawahata, Jun-ichi [Hitachi, Ltd. (Japan)

    2006-07-01

    In nuclear power plant construction, countless variety of parts, products, and jigs more than one million are treated under construction. Furthermore, strict traceability to the history of material, manufacturing, and installation is required for all products from the start to finish of the construction, which enforce much workforce and many costs at every project. In an addition, the operational efficiency improvement is absolutely essential for the effective construction to reduce the initial investment for construction. As one solution, RFID (Radio Frequent Identification) application technology, one of the fundamental technologies to realize a ubiquitous society, currently expands its functionality and general versatility at an accelerating pace in mass-production industry. Hitachi believes RFID technology can be useful of one of the key solutions for the issues in non-mass production industry as well. Under this situation, Hitachi initiated the development of next generation plant concept (ubiquitous plant construction technology) which utilizes information and RFID technologies. In this paper, our application plans of RFID technology to nuclear power is described. (authors)

  12. The construction of power in family medicine bedside teaching: a video observation study.

    Science.gov (United States)

    Rees, Charlotte E; Ajjawi, Rola; Monrouxe, Lynn V

    2013-02-01

    Bedside teaching is essential for helping students develop skills, reasoning and professionalism, and involves the learning triad of student, patient and clinical teacher. Although current rhetoric espouses the sharing of power, the medical workplace is imbued with power asymmetries. Power is context-specific and although previous research has explored some elements of the enactment and resistance of power within bedside teaching, this exploration has been conducted within hospital rather than general practice settings. Furthermore, previous research has employed audio-recorded rather than video-recorded observation and has therefore focused on language and para-language at the expense of non-verbal communication and human-material interaction. A qualitative design was adopted employing video- and audio-recorded observations of seven bedside teaching encounters (BTEs), followed by short individual interviews with students, patients and clinical teachers. Thematic and discourse analyses of BTEs were conducted. Power is constructed by students, patients and clinical teachers throughout different BTE activities through the use of linguistic, para-linguistic and non-verbal communication. In terms of language, participants construct power through the use of questions, orders, advice, pronouns and medical/health belief talk. With reference to para-language, participants construct power through the use of interruption and laughter. In terms of non-verbal communication, participants construct power through physical positioning and the possession or control of medical materials such as the stethoscope. Using this paper as a trigger for discussion, we encourage students and clinical teachers to reflect critically on how their verbal and non-verbal communication constructs power in bedside teaching. Students and clinical teachers need to develop their awareness of what power is, how it can be constructed and shared, and what it means for the student

  13. Development of construction technology for nuclear power plants

    International Nuclear Information System (INIS)

    Schnellenbach, G.

    1975-01-01

    Stringent safety requirements for nuclear power plants create new technological problems in their construction. The development is influenced by the mode of operation of the respective reactors which leads to different construction styles of the reactor buildings. Accomodation of extraordinary load cases such as earthquake, airplane crash, and blast due to chemical explosions, requires additional treatment. Significant new problems arise for the prestressed concrete reactor pressure vessels and concrete containments, prestressed or reinforced. (orig.) [de

  14. Outline of construction and facility features of Onagawa nuclear power station Unit No. 2

    International Nuclear Information System (INIS)

    Umimura, Yoshiharu; Tsunoda, Ryohei; Watanabe, Kazunori

    1996-01-01

    Tohoku Electric Power Company promotes development of various power sources to provide a stable supply of electricity in the future, and nuclear power takes a leading part. In August 1989, construction of Onagawa nuclear power plant Unit No. 2 (825MW) was started, following Unit No. 1 (524MW) which went on line in 1984 as Tohoku Electric's first nuclear power plant unit. Unit No. 2 began commercial operation in July 1995 through satisfactory construction work such as RPV hydraulic test in March 1994, fuel loading in October 1994, and various startup tests in each power stage. The design and construction of Unit No. 2 reflect construction and operation experience gained from Unit No. 1, and the latest technology, including that of the LWR Improvement and Standardization Program, was adopted to enhance facility reliability, improve operation and maintenance performance, and reduce worker dosage. Features of the facility, construction techniques, and a description of preoperation of Onagawa nuclear power plant Unit No. 2 are described in this paper. (author)

  15. AC power flow importance measures considering multi-element failures

    International Nuclear Information System (INIS)

    Li, Jian; Dueñas-Osorio, Leonardo; Chen, Changkun; Shi, Congling

    2017-01-01

    Quantifying the criticality of individual components of power systems is essential for overall reliability and management. This paper proposes an AC-based power flow element importance measure, while considering multi-element failures. The measure relies on a proposed AC-based cascading failure model, which captures branch overflow, bus load shedding, and branch failures, via AC power flow and optimal power flow analyses. Taking the IEEE 30, 57 and 118-bus power systems as case studies, we find that N-3 analyses are sufficient to measure the importance of a bus or branch. It is observed that for a substation bus, its importance is statistically proportional to its power demand, but this trend is not observed for power plant buses. While comparing with other reliability, functionality, and topology-based importance measures popular today, we find that a DC power flow model, although better correlated with the benchmark AC model as a whole, still fails to locate some critical elements. This is due to the focus of DC-based models on real power that ignores reactive power. The proposed importance measure is aimed to inform decision makers about key components in complex systems, while improving cascading failure prevention, system backup setting, and overall resilience. - Highlights: • We propose a novel importance measure based on joint failures and AC power flow. • A cascading failure model considers both AC power flow and optimal power flow. • We find that N-3 analyses are sufficient to measure the importance of an element. • Power demand impacts the importance of substations but less so that of generators. • DC models fail to identify some key elements, despite correlating with AC models.

  16. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  17. Nuclear power plants in Europe 1995. Report about operation, construction, and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Report about Operation, Construction, and Planning in 18 European Countries Eighteen European countries operate and build, respectively, nuclear power plants in 1995. The ''Nuclear Power Plants in Europe 1995'' atw report singles out the main events and lines of development. As per August 1995, 214 (1994: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,010 (176,322) MWe installed gross capacity are in operation in seventeen countries, and 26 (30) units with 24,786 (28,086) MWe are under construction in seven countries. This adds up to a total of 240 (245) nuclear generating units with an aggregate 201,796 (204,408) MWe. In the nuclear power plants in Europe, some 1048 TWh of nuclear power was converted into electric power in 1994; 792 TWh of this aggregate was converted in 137 units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 77%, has the highest share of nuclear power in Europe, followed by France with 75% and Belgium with 56%. The lowest percentage, only 5%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power plants are operated, such as Italy or Austria. (orig.) [de

  18. Quality control of three main materials for civil construction of nuclear power plant

    International Nuclear Information System (INIS)

    Wang Feng

    2011-01-01

    The construction and operation of nuclear power plant is a systematic engineering. To ensure quality and safety of nuclear power plants, each work from design to operation can have certain impact on the quality and safety of the project. The quality of each related work shall be controlled. Starting from the quality control over raw materials for the civil construction of nuclear power plant, this article mainly analyzes how to control the quality and manage the three main materials of steel, concrete and modular parts in the civil construction. (author)

  19. Design, Construction and Testing of an Uninterruptible Power ...

    African Journals Online (AJOL)

    Design, Construction and Testing of an Uninterruptible Power Supply of 300 Watts Capacity. ... is transformed using the transformer to 240v a.c., 50Hz. The system also has in-built voltage reversal protection, automatic change-over and battery ...

  20. Experience with construction and assembly of V-1 nuclear power plant

    International Nuclear Information System (INIS)

    Prochazka, J.; Stepanek, S.; Drahy, J.

    1981-01-01

    The model is discussed of the constructions of the V-1 nuclear power plant at Jaslovske Bohunice with SKODA Trust fulfilling the role of the general supplier of the secondary part technology and the chief and special assembly contractor. The SKODA Trust mediated the Soviet supplies of technology, Soviet assembly and special assembly, and the mounting of the primary part according to Soviet projects. Plant start-up was safeguarded by the investor through Bohunice power plant staff and Soviet experts. The assembly of the primary circuit and the test assembly of reactor parts are described and the experience gained is discussed. The technological requirements are illustrated by the most important characteristics of the individual parts of the primary circuit. Also described are the design specifications of the 220 MW saturated steam turbine and the experience with its assembly and start-up. (B.S.)

  1. 4D Simulation for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Jeong, Seo G.; Suh, Kune Y.

    2006-01-01

    For the timely and competitive response to rapidly changing energy environment at the turn of millennium, there is a desperate need to build the nuclear power plant (NPP) in the virtual reality of digital engineering prior to commissioning. To construct a NPP is a highly integrated, voluminous project. Verification of design and initial planning is prerequisite to construction to confirm optimal fabrication and high productivity. This paper presents the design feasibility by simulating the initial construction plan of NPP using four-dimensional (4D) simulation. The virtual reality method, using three dimensional (3D) computer-aided design (CAD) model, enables various designs in the project launching stage to be promptly and exactly previewed

  2. Nuclear Power Plants. Construction status report, data as of February 28, 1978

    International Nuclear Information System (INIS)

    1978-03-01

    Data on the construction status of nuclear power plants in the US as of February 28, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  3. Design and construction of nuclear power plants

    International Nuclear Information System (INIS)

    Meiswinkel, Ruediger; Meyer, Julian; Schnell, Juergen

    2013-01-01

    Despite all the efforts being put into expanding renewable energy sources, large-scale power stations will be essential as part of a reliable energy supply strategy for a longer period. Given that they are low on CO2 emissions, many countries are moving into or expanding nuclear energy to cover their baseload supply. Building structures required for nuclear installations whose protective function means they are classified as safety-related, have to meet particular construction requirements more stringent than those involved in conventional construction. This book gives a comprehensive overview from approval aspects given by nuclear and construction law, with special attention to the interface between plant and construction engineering, to a building structure classification. All life cycle phases are considered, with the primary focus on execution. Accidental actions on structures, the safety concept and design and fastening systems are exposed to a particular treatment. Selected chapters of the German concrete yearbook ''Beton-Kalender'' are now available in English. The new English BetonKalender Series delivers internationally useful engineering expertise and industrial know-how from Germany.

  4. Stages in planning and construction of the Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Pracht, F.

    1975-01-01

    On October 23, 1972, RWE gave a letter of intent and on January 9, 1973 an order for the construction of a nuclear power plant on a turn-key basis to the consortium of BBC, BBR and Hochtief. The power plant in question was the Muelheim-Kaerlich nuclear power station with a pressurized-water reactor of a gross efficiency of 1,295 MWe. After considerable delay of the project, the first building permit was issued to the builder-owner on January 15, 1975, and the constructional work on the building site started immediately afterwards. As the planning and constructional work has so far been carried out according to schedule and the consortium intends to keep the effects of the belated license as small as possible, the start-off of the plant will probably be in summer 1979 if the constructional work is not interrupted. (orig./AK) [de

  5. The Brazilian participation in the nuclear power plant construction

    International Nuclear Information System (INIS)

    Fabricio, R.A.C.

    1981-01-01

    A brief review about the origin of the brazilian nuclear power program and the strategy adopted for its implementation in Brazil is presented. The creation of the Nuclebras Engineering S/A, the Germany technology transfer and the personell job-training in Brasil are discussed. Some management models used for nuclear power plant construction in the world are still presented. (E.G.) [pt

  6. Nuclear power plants. Construction status report, data as of April 30, 1978

    International Nuclear Information System (INIS)

    1978-05-01

    Data on the construction status of nuclear power plants in the U.S. as of April 30, 1978 are presented. The data include licensing activities affecting the construction as well as detailed information on construction activities and schedules

  7. Big five general contractors dominate civil construction market of nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    The Japanese construction industry is a key industry accounting for about 20 % of the GNP, and the investment in construction amounted to 51,200 billion yen in fiscal 1984. 515,000 firms employing about 5.5 million workers belong to the industry. 99.4 % of these firms is the enterprises capitalized at less than 100 million yen, and most of them are small self-employment enterprises. The Construction Business Law provides that those who wish to engage in construction are required to obtain a permit from the Construction Ministry or from a local prefectural governor. There are big five and seven sub-major construction companies in Japan. The big five formed the tie-up relations with three nuclear reactor manufacturers. 76 civil engineering and construction companies recorded the sales related to nuclear power in 1983 amounting to 330.9 billion yen, equivalent to 21 % of the total nuclear-related sales. The construction of nuclear power plants and the characteristics of the construction, and the activities of the big five in the field of nuclear industry are reported. (Kako, I.)

  8. The de-construction programme for EDF'S first generation power plants

    International Nuclear Information System (INIS)

    Zask, G.; Corcuff, A.

    2003-01-01

    Before 2001 EDF had adopted a 'long wait' scenario for the de-construction of nuclear power plants, consisting of waiting for a period of 5 to 10 years for IAEA level 2 (partial release of the site), then postponing the total de-construction of the facility for 25 to 50 years, in order to benefit from the natural decay of the radioactivity and thereby reduce the dosimetry of the personnel and the costs. Today, as regards the 8 power plants of the first generation and Creys-Malville, EDF has decided to undertake the total de-construction over a period of 25 years of all its reactors that have ceased commercial operation. The forecast cost of this programme amounts to Euro 3 billion. It thus intends to demonstrate its capacity to control, within the scale of the human lifespan, the entire life cycle of its nuclear power plants, while minimising the impact on man and the environment. This choice of immediate dismantling for the power plants of the first generation does not prejudge what will be done, when the time comes, for the PWR plants currently in operation. The paper has the following contents: 1. General; 2.The facilities concerned; 3. Chronological sequence adopted for de-construction; 4. Milestones and critical paths; 4.1. Simplification of the administrative procedures; 4.2. The waste channels; 4.3. Industrial organisation; 4.3.1. Creation of Centre d'Ingenierie De-construction et Environnement (CIDEN); 4.3.2. Responsibilities, interfaces and co-ordination of the various departments concerned (Role of owner: Responsibility as nuclear operator; Overall co-ordination; Operational steering of projects); 4.3.3. Internal authorization process; 4.3.4. Obtaining and maintaining skills (Training; Environment; De-construction; Radiological protection, radiology, radioecology; Processing of waste and approval of the cycle); 4.3.5. Monitoring of works and surveillance of service providers; 4.3.6. Radiological protection, environment; 4.3.7. Control of conventional

  9. EVMS for nuclear power plant construction: status and implementation

    International Nuclear Information System (INIS)

    Roh, M. S.; Kwak, J. K.; Park, S. Y.

    2012-01-01

    The Earned Value Management System (EVMS) method integrates three critical elements of project management scope, cost and time management. It requires the periodic monitoring of actual expenditures and physical scope accomplishments and allows calculation of cost and schedule variances along with performance indices. It allows for casting of project cost and schedule at completion and highlights the possible need for corrective action. It is anticipated that there will be intense competition in the nuclear industry as the cost and time for nuclear power plant construction. In order to attain competitive advantages, utilizing advanced project control systems by integrating cost and time management is of great concern for practitioners. This paper is to review the status of EVMS and its effective implementation to nuclear power plant construction

  10. Popularization of the role of nuclear power construction

    International Nuclear Information System (INIS)

    Zhang Ying

    2010-01-01

    Scientific popularization shall be promoted in advance before nuclear power development. Since it was founded, Jiangsu Nuclear Power Corporation (JNPC) has always focused on the popularization of nuclear power knowledge to enable the public understand and access to nuclear power. Adhering to the center 'Popularizing nuclear power knowledge, correct steering of the public, serving the construction of TNPS and promoting the corporation development', the way of 'going out and coming in' for publicizing nuclear power knowledge has been gradually formed in line with the principle of 'close to the society, close to the people and close to the life'. The scientific popularization resources have been deeply dug out, and the education mode innovated. The healthy and continuous development of scientific popularization and education work are recognized and appraised highly by all circles of the society. Nowadays, a good atmosphere of 'everyone contends to popularize nuclear power knowledge' has formed in JNPC, and internal and external popularization and education work have yielded good results, which have created favorable social environment for the safe, proper and fast development of Tianwan Nuclear Power Station. (author)

  11. The research on the material management system in nuclear power plant construction process

    International Nuclear Information System (INIS)

    Liu Xuegeng; Huang Zhongping

    2010-01-01

    According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)

  12. Increase in the import of the electric power

    International Nuclear Information System (INIS)

    Kangas, H.

    2000-01-01

    Exceptionally large amounts of electric power were imported in Finland from Sweden during the spring and early summer. The reason for this was the good conditions for production of hydroelectric power. Because of the imports it has been possible to reduce the generation of the expensive domestic condensing power. The consumption of electric power increased, compared to May 1998, by 1.7%. The private consumption of electric power was 7-8% due to the lower average temperature of the year 1999. May 1999 has been about two deg C lower than the long-term average. About 6.1 TWh of power was consumed in Finland in May 1999, while the consumption in May 1998 was about 100 GWh lower. The power consumption of the past 12 months was 76.9 TWh, which is about 2.1% higher than the value of the previous 12 months. The long lasting increase in production of hydroelectric power started to cease. The hydroelectric power generated in May-June 1999 exceeded 1.2 TWh, the reduction, compared to the previous year, was only a little over 5%. The production of hydroelectric power during the past 12 months was 15.4 TWh. This corresponds to 20% of the total power demand in Finland. The corresponding value of the previous year was nearly 22%. The generation of wind power in May-June 1999 was about 5 GWh, the amount of the previous 12 months being 29 GWh. Both of these values are about twice higher than the figures of the 12 months before that. The power generation capacity of Finnish nuclear power plants in May-June 1999 less than 3.4 TWh, which are about 15% higher than the value of the previous year. The share of nuclear power during May-June 1999 of the total amount of power consumption was 30%. The amount of nuclear power generated during the first half of the year in Finland was more than 11 TWh. The nuclear power generation capacity of the previous 12 months was 21.8 TWh. Cogeneration of power and heat has been nearly the same both in 1998 and 1999, the growth being only 1.4%. The

  13. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  14. Managing risks during the construction of a power generation facility

    International Nuclear Information System (INIS)

    Loulakis, M.C.

    1992-01-01

    The construction of a power generation facility is a substantial undertaking that involves considerable risks to all parties involved. While contractors are accustomed to dealing with risks, construction owners are typically more naive about not only the risks they are assuming in the construction of a project, but also about the role they play on the project itself. Owners and developers of power facilities must understand at the outset that their role during the construction of a project is as integral to the success of the project as that of the designer and contractor. In addition, owners should also understand that there are virtually no risks on a construction project that cannot be shifted among the contracting parties as part of the business deal. Consequently, an owner may contractually be assuming the risks of (1) unusually severe weather, (2) unexpected subsurface conditions, (3) strikes at the turbine supplier's plant or (4) changes in law - as well as the increases in price and delays to project completion associated with such risks. In light of this, a prudent owner will evaluate more than just whether there is sufficient financing to complete the construction of a contemplated project. Prudent owners will conduct a risk management review of the project structure and the contracting terms, with the primary focus being (1) the identification and analysis of the most significant risks faced, (2) a determination of how such risks can be either mitigated or eliminated, and (3) the assessment of the financial exposure to the owner should the potential risk become a reality. This paper will present the framework that owners and developers of power generation projects can use in undertaking such a risk management review

  15. Sustainability Evaluation of Power Grid Construction Projects Using Improved TOPSIS and Least Square Support Vector Machine with Modified Fly Optimization Algorithm

    Directory of Open Access Journals (Sweden)

    Dongxiao Niu

    2018-01-01

    Full Text Available The electric power industry is of great significance in promoting social and economic development and improving people’s living standards. Power grid construction is a necessary part of infrastructure construction, whose sustainability plays an important role in economic development, environmental protection and social progress. In order to effectively evaluate the sustainability of power grid construction projects, in this paper, we first identified 17 criteria from four dimensions including economy, technology, society and environment to establish the evaluation criteria system. After that, the grey incidence analysis was used to modify the traditional Technique for Order Preference by Similarity to an Ideal Solution (TOPSIS, which made it possible to evaluate the sustainability of electric power construction projects based on visual angle of similarity and nearness. Then, in order to simplify the procedure of experts scoring and computation, on the basis of evaluation results of the improved TOPSIS, the model using Modified Fly Optimization Algorithm (MFOA to optimize the Least Square Support Vector Machine (LSSVM was established. Finally, a numerical example was given to demonstrate the effectiveness of the proposed model.

  16. Innovation in civil construction system of nuclear power plant

    International Nuclear Information System (INIS)

    Takami, Masahiro

    1996-01-01

    Nowadays, the computer-aided production systems have been already introduced to almost all kinds of industries. The construction industry, which has been said to be conservative for the modernization of production system, now expects the CIC (Computer Integrated Construction) as the means to innovate the construction production process. Shimizu Corporation has developed the new computer-aided production system, 'SIPS: Shimizu Integrated Production System', and has used it in the actual construction projects. In the system, the computer supports every phase of construction projects like market researching, design, material purchase, construction work, and maintenance. The project of Kashiwazaki-kariwa Nuclear Power Station Unit No.7 is one of the model cases. Here we applied following three concepts, (1) the full use and integration of 3D-CAD data-base through all phases of construction, (2) the setting-up of the information network system among the site office, the head office, and the mechanical and electrical manufacturer, (3) the introduction of advanced construction technologies such as large block prefabrication method. (author)

  17. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  18. Delay consequencies in the construction time-schedule of nuclear power plants in relation to its safety and quality

    International Nuclear Information System (INIS)

    Recalde, J.A.

    1991-01-01

    An important delay in the construction time-schedule of a Nuclear Power Plant affects its safety and quality. This mainly occurs as a consequence of four reasons: discontinuity of the personnel working for the project; discontinuities of project suppliers; new safety and quality concepts; long-term storage. This work analyses each of the above reasons so as to foresee countermeasures to garantee the non deterioration of a Nuclear Power Plant. (author)

  19. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  20. Construction risks of nuclear power plants for use in cost-effectiveness considerations

    International Nuclear Information System (INIS)

    Bock-Werthmann, W.

    1986-08-01

    The construction risk study is concerned with a nuclear power station of 1300 MW(e) design output. The risk figures obtained demonstrate that construction risks of nuclear power plants form a substantial share of the total risk from all steps of the nuclear fuel cycle. When compared with other risk figures it is apparent that only the fatalities caused by the extraction of uranium are of similar magnitude. (55 references). (DG)

  1. Socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    1984-01-01

    The proceedings contain 10 papers of which 9 have been inputted in INIS. The papers deal with the economic, social and ecological consequences of the construction of nuclear power plants. Various approaches are listed to the economic evaluation of the said consequences. The question is discussed of the efficiency of investments for the construction of nucliear power plants as are the probiems of sitting large projects. (E.S.)

  2. Planning construction of integrative schedule management for nuclear power project

    International Nuclear Information System (INIS)

    Zeng Zhenglin; Wang Wenying; Peng Fei

    2012-01-01

    This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)

  3. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  4. Construction of Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamanari, Shozo; Miyahara, Ryohei; Umezawa, Takeshi; Teshiba, Ichiro

    2006-01-01

    Construction of the Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Co., Inc. (advanced boiling-water reactor; output: 1.358 mega watts) was begun in August 1999 and it will resume commercial operation in March 2006 as scheduled. Hitachi contributed effectually toward realizing the project with supply of a complete set of the advanced nuclear reactor and turbine-generator system with the latest design and construction technology in harmony. Large-scale modular structures for installation and a computer-aided engineering system for work procedure and schedule management were applied with the utmost priority placed on work efficiency, safety and quality assurance. (T.Tanaka)

  5. Evaluation of the energy required for constructing and operating a fusion power plant

    International Nuclear Information System (INIS)

    Buende, R.

    1982-09-01

    The energy required for constructing and operating a tokamak fusion power plant is appraised with respect to the energy output during the lifetime of the plant. A harvesting factor is deduced as a relevant figure of energetic merit and is used for a comparison between fusion, fission, and coal-fired power plants. Because fusion power plants involve considerable uncertainties the comparison is supplemented by a sensitivity analysis. In comparison with Light Water Reactor plants fusion power plants appear to be rather favourable in this respect. The energy required for providing the fuel is relatively low for fusion plants, thus overcompensating the considerable higher amount of energy necessary for constructing the fusion power plant. (orig.)

  6. Current status of construction of nuclear power plants No. 7, No. 8 in Korea

    International Nuclear Information System (INIS)

    Sug, S.H.

    1979-01-01

    The up-to-date accomplishment and future work in the construction of nuclear power plants in Korea are outlined. The scope of the construction project of the No. 7 and No. 8 power plants, selection of the suppliers of the main instruments, assessment of the planning, architecture, engineering, construction fund, procurement of nuclear fuel, and the necessities of home production of various nuclear materials are briefly summarized. (author)

  7. Computer aided construction engineering system for nuclear power plants

    International Nuclear Information System (INIS)

    Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun

    1990-01-01

    The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)

  8. Optimalisation of national industry participation in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sriyana

    2008-01-01

    A study of national industry participation based on recent data has already been conducted. The current industry data is used to estimate the optimum level of national industry participation in nuclear power plant (NPP) construction based on the prior study. The purpose of the study is to give a figure of the optimum level of national industry participation in NPP construction. The scope of the study is the NPP construction project in related to the potency of national industry to participate in the project. The methodology used in the study are literature study, web surfing for industrial data, and on-the-spot industry survey that are potential to participate in NPP construction. In addition to that, discussion with expertise of industrial practitioner was also conducted. The study concludes that (1) based on the recent national industry capability provided and compared to prior similar study, it is estimated that the level of national industry participation in the first NPP construction with the capacity of 1000 MWe PWR is about 40%. (2) to accelerate NPP technology transfer, we need to build a small size NPP. The nuclear island will be developed by BATAN in cooperation with national industry and the non-nuclear island will be developed by national industry. Universities and other academicians should be involved to support and keep the sustainability of man power availability in developing the NPP technology. (author)

  9. Technology transfer by industry for the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Frewer, H.; Altvater, W.

    1977-01-01

    The construction of nuclear power plants call for a wide sphere of industrial activities, nuclear as well as conventional. For a specific country the ways and methods of developing an industrial nuclear power program and reaching the target of independence, will widely differ, depending on the size of the country, the economic situation, the already existing industrial manufacturing and engineering capacities, the time schedule of the program and the type of contracting. The experience in effective technology transfer for the strengthening and setting up the national industry, and the engineering capacities, needed for the construction of nuclear power plants up to the largest size existing today are considered. The German nuclear power industry gained this experience in connection with the turn-key supply of the first units in various countries. The prerequisites and national nuclear power programs were different. Based on a successful technological development, including standardization, the German nuclear power industry could meet the demand and different approaches in these countries. The main features and practices followed for the transfer of technology is described for three different cases, namely Argentina, Brazil and Iran. (author)

  10. The analysis of energy-time sequences in the nuclear power plants construction

    International Nuclear Information System (INIS)

    Milivojevic, S.; Jovanovic, V.; Riznic, J.

    1983-01-01

    The current nuclear energy development pose many problems; one of them is nuclear power plant construction. They are evaluated energy and time features of the construction and their relative ratios by the analysis of available data. The results point at the reached efficiency of the construction and, in the same time, they are the basis for real estimation of energy-time sequences of the construction in the future. (author)

  11. Measuring the environmental costs of tidal power plant construction: A choice experiment study

    International Nuclear Information System (INIS)

    Lee, Joo-Suk; Yoo, Seung-Hoon

    2009-01-01

    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.

  12. Measurements of the radioactivity of power plant by-products processed into construction materials

    International Nuclear Information System (INIS)

    Marcinkowski, S.A.; Dudelewski, H.A.

    1992-01-01

    The subject of the recycling of residual products comprising, inter alia, fly ash and slags accuring from the combustion of black and brown coal in modern coal dust boilers in the power industry has been topical for a number of years. Numerous discussions and articles in technical periodicals and the daily press have revolved around the problem of the radioactivity of construction materials or construction elements obtained from fly ash or slags of power plant. In Poland, this was a forbidden subject until the publication in 1980 by the Warsaw institute of construction technology of standard no. 234 entitled: 'Recommendations for establishing the natural radioactivity of products processed into construction materials'. (orig.) [de

  13. Country Report Summary: Japan [Project Management in Nuclear Power Plant Construction: Guidelines and Experience

    International Nuclear Information System (INIS)

    2012-01-01

    The Hokkaido Electric Power Company (HEPCO) is the owner of the Tomari NPP comprising three operating PWR units. The latest unit to be connected to the grid, Tomari Unit 3, is a 3-loop PWR power plant with an electric output of 912 MW(e) supplied by Mitsubishi Heavy Industries (MHI). This is the newest unit in HEPCO and it is the newest PWR unit in Japan as well. The first concrete at Tomari Unit 3 was poured at the end of summer in 2004. The unit entered into commercial operation in December 2009. The Tomari site is located on a northern Japanese island. It is battered by strong winds and receives much snow in the winter. Therefore, civil works and building construction were temporarily suspended every year from the beginning of December until the end of March. This increased construction duration by one year compared to other sites. Consequently from first concrete to the start of commercial operation construction at Tomari lasted 64 months. There are specific factors in the approach to construction of nuclear power plants in Japan. (1) Japanese legislation defines that the sole licensee must be the electric power company. This implies that the electric power company is responsible for the safety of the plant and in that capacity it must submit for approval the Safety Analysis Report (SAR) but it is also responsible for the design and reliability of the plant; hence it must also submit for approval the Construction Plan (CP), containing all necessary detailed design information. Consequently, the electric power company becomes the sole counterpart to the regulatory body on all aspects of the project. (2) All Japanese electric power companies are considerably large and have the tradition to do the engineering of their power plant themselves, and this not only for nuclear but also for conventional power plant. Therefore, the owner/utilities in Japan carry themselves the burden of major portions of the engineering, procurement and construction (EPC) of their NPPs

  14. New technologies in Islamic countries. Power engineering, transport, oil industry, machinery construction, building construction and information technologies problems

    International Nuclear Information System (INIS)

    Sharipova, N.S.

    1999-01-01

    The published proceedings contain brief presentations concerning new technologies in power engineering, transport, oil industry, machinery construction, building construction and information technologies presented to the International scientific and technical conference: New technologies in Islamic countries, which was organized within frame work of 6 General Assembly of Federation of engineering Institutes of Islamic countries (FEIIC). (author)

  15. Abstract of articles presented at the seminar of investigating the construction of nuclear power plant in Iran

    International Nuclear Information System (INIS)

    Hariri, A.; Khonsari Moosavi, R.; Shoai-Naini, J.; Motamedi, M.A.

    1982-01-01

    Under five subtitles papers had been presented to the seminar of investigating the construction of nuclear power plant held at Isfahan by Atomic Energy Organization of Iran (AEOI). 1.The necessity of constructing nuclear power plants in Iran with relation to the development of nuclear technology. 2.Seven articles survey the problem of fuel cycling and the potentiallity of AEOI in this field. 3. Four papers allocate to the technology of nuclear safety and radiation protection. 4.Three papers evaluate technical and scientific capabitities of AEOI for constructing nuclear power plants, and two paper about planning and training man power with an aim toward construction of nuclear power plants

  16. Needs for Constructing and Possibilities of Nuclear Power Plants Interconnection to the Croatian Electricity Grid

    International Nuclear Information System (INIS)

    Zeljko, M.; Bajs, D.

    1998-01-01

    Due to development of electric power system and considering an increase of electrical energy consumption, needs for larger units in new power plants are obvious. Connection of large nuclear power plants to the grid, depending on their power and location, usually requires significant investments in transmission network development and construction. Considering the capacity of the 400 kV transmission network in Croatia, this problem is evident. This paper deals with the possibilities of nuclear power plants construction, as one possible option in electric power system development, and their interconnection to the electricity grid. (author)

  17. Housekeeping during the construction phase of nuclear power plants - approved 1973

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    Housekeeping requirements are presented for the control of work activities, conditions, and environments that can affect the quality of important parts of a nuclear power plant during the construction phase. These parts include the structures, systems, and components whose satisfactory performance is required for the plant to operate reliably, to prevent accidents that cause undue risk to the health and safety of the public, or to mitigate the consequences of such accidents if they were to occur. Housekeeping encompasses all activities related to control of cleanness of facilities, cleanness of material and equipment, fire prevention and fire protection including disposal of combustible materials and debris, control of access, and protection of equipment not denoted in other Standards

  18. Possibilities for construction of small hydroelectric power plants in the Republic of Bulgaria

    International Nuclear Information System (INIS)

    Iliev, S.; Angelov, M.; Stojkov, S.; Lefterov, B.

    2001-01-01

    The hydroenergy potential of Bulgaria and its utilization until 2000 is discussed. An assessment is made of the possibilities of the use of additional micro-hydroenergy potential (the preliminary evaluation gives about 1.3 bill. kWh/y with total power 250 MW). In the National Strategy for the development, use and preservation of water in Bulgaria till 2020 it is envisioned 60 micro HPP with power of 36 MW power to be constructed. The Program for hydro energy to 2010 envisioned including of private investments if the construction, buying up the electric energy by the National Electric Company and two-stage construction of the cascade 'Sreden Iskyr' with 10 small NPPs. The necessity of the development of a Manual of express investigation and design of small NPP is substantiated

  19. Concerning the structure of occupational accidents involving construction workers in the erection of nuclear power plants

    International Nuclear Information System (INIS)

    Nowak, B.; Roebenack, K.D.

    1991-01-01

    An investigation of 561 occupational accidents involving construction workers which took place during the construction of nuclear power plants failed to show any significant deviation in comparison with general construction as regards process classification, classification of accidents according to occupation and situation, and accidents severity. Occupational accidents which are typial for nuclear power plant construction are a rare exception. (orig.) [de

  20. Quality assurance during site construction of nuclear power plants

    International Nuclear Information System (INIS)

    1981-01-01

    This Safety Guide provides requirements and recommendations related to the establishment and implementation of a quality assurance programme for the site construction activities at nuclear power plants. These include activities such as fabricating, erecting, installing, handling, storing, cleaning, flushing, inspecting, testing, modifying, repairing, and maintaining

  1. Building technology on construction site of nuclear power plant at Zaporozh'e

    Energy Technology Data Exchange (ETDEWEB)

    Dusek, R; Matyas, V [Vodni Stavby, Prague (Czechoslovakia)

    1981-12-01

    Basic data and technical and economic indexes are shown for a WWER 1000 nuclear power plant being built 120 km off Zaporozh'e (USSR). The schedule of construction and the choice of the means of mechanization used for building work are reported. Discussed are building machines used, the location of assembly cranes of the main unit, the design and the building technology of the reactor part, the engine house, deisel generator station, the special operations building, the use of concrete and steel units in the building, and the procurement of materials for the construction. The knowledge gained from the building of the power plant will be applied in the CSSR in the building of 1000 MW unit power plants.

  2. Risk Evaluation of a UHV Power Transmission Construction Project Based on a Cloud Model and FCE Method for Sustainability

    Directory of Open Access Journals (Sweden)

    Huiru Zhao

    2015-03-01

    Full Text Available In order to achieve the sustainable development of energy, Ultra High Voltage (UHV power transmission construction projects are being established in China currently. Their high-tech nature, the massive amount of money involved, and the need for multi-agent collaboration as well as complex construction environments bring many challenges and risks. Risk management, therefore, is critical to reduce the risks and realize sustainable development of projects. Unfortunately, many traditional risk assessment methods may not perform well due to the great uncertainty and randomness inherent in UHV power construction projects. This paper, therefore, proposes a risk evaluation index system and a hybrid risk evaluation model to evaluate the risk of UHV projects and find out the key risk factors. This model based on a cloud model and fuzzy comprehensive evaluation (FCE method combines the superiority of the cloud model for reflecting randomness and discreteness with the advantages of the fuzzy comprehensive evaluation method in handling uncertain and vague issues. For the sake of proving our framework, an empirical study of “Zhejiang-Fuzhou” UHV power transmission construction project is presented. As key contributions, we find the risk of this project lies at a “middle” to “high” level and closer to a “middle” level; the “management risk” and “social risk” are identified as the most important risk factors requiring more attention; and some risk control recommendations are proposed. This article demonstrates the value of our approach in risk identification, which seeks to improve the risk control level and the sustainable development of UHV power transmission construction projects.

  3. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  4. Power and LPG production with LNG import

    International Nuclear Information System (INIS)

    Mak, J.Y.

    2004-01-01

    When used in power cogeneration, Liquefied Natural Gas (LNG) is both energy efficient and can eliminate seawater or fuel gas consumption as well as the associated environmental impacts of conventional regasification processes. However, some liquefied natural gas (LNG) sources have heating values higher than current North American natural gas pipelines can allow for. LNG from these cannot be injected into gas pipelines without several heating control processing steps. This paper outlines two new technologies developed to address this issue. The first is a power cogeneration process using LNG as a heat sink. The second technology involves a fractionation process removing Liquid Propane Gas (LPG) components from imported LNG, thereby controlling heat value. Both technologies are applicable in grassroots installations as well as being suitable for retrofitting to existing LNG regasification for power generation and LPG production. It was concluded that power cogeneration with a mixed fluid power cycle recovered a significant portion of energy in LNG liquefaction plants. Additionally, it was also possible to fractionate high quality LPG from LNG at a low cost, with the residue being further re-condensed and re-utilized for power generation. It was also concluded that the LNG fractionation process would add flexibility to the LNG receiving terminals, allowing the import of lower quality LNG to North America, while also generating additional revenues from LPG production. 3 refs., 5 tabs., 6 figs

  5. International construction trends for power plants

    International Nuclear Information System (INIS)

    Armor, A.F.

    1991-01-01

    In this review of trends in new, worldwide plant construction it is apparent that the technologies being applied are often geared to the cost of money issue. In an era when interest rates can fluctuate widely, particularly in Third World countries, the need to put new power plants on-line quickly has become a key issue. For example, this has largely triggered the move to smaller, more dispersed plants, with unit sizes 400 MW and below, compared with the 1,000 MW + sizes of 10-20 years ago. It has also renewed the emphasis on modular methods of building components, and on innovative transportation procedures. It has given support to the packaged power plants, such as PFBC, which can be largely pre-assembled. In the US, it has spawned a new infrastructure of independent constructors and power generators, who have partially lifted the burden of new plant financing from the shoulders of the utilities. Yet, national needs are not always the same. Fuels may or may not be indigenous. Environmental restrictions are nationally, or even locally, imposed. Government subsidies and strategic needs can override the short-term objectives. This paper briefly surveys current approaches to new generating plants in some key areas of the world. One aspect of electric power generation seems clear. In terms of power consumption, the world is on the move again - not only in third world countries, but also in the developed nations as the memories of the oil embargo of 15 years ago fade. Trends are discussed for the US, Japan, the rest of Asia, South Africa, Western Europe, Russia, and Eastern Europe

  6. Safety awareness educational topics for the construction of power transmission systems with smart grid technologies

    Directory of Open Access Journals (Sweden)

    Bryan Hubbard

    2013-09-01

    Full Text Available Power transmission facilities in the U.S. are undergoing a transformation due to the increased use of distributed generation sources such as wind and solar power.  The current power grid system is also antiquated and in need of substantial retrofits to make it more efficient and reliable.  The new energy transmission system being designed and built to optimize power delivery is known as “Smart Grid”.  The increased activity in the construction of power transmission facilities and installation of new technologies into the current power system raises potential safety concerns.  Existing construction management curriculum may include general information about safety training, but does not typically include information about this specialized sector.  The objective of this study was to work with industry to identify key safety topics appropriate for inclusion in an introductory industrial construction course.  Results of interviews with industry identified numerous hazards that are not typically covered in typical construction curricula.  A joint undergraduate and graduate course in industrial construction was created to address these and additional concepts. A survey of the students was performed to determine the effectiveness of the course and also to determine their thoughts about the smart grid technologies and safety training. Information on electrical system hazards is presented along with results of the student surveys.

  7. Self-reliance and innovation to improve the localization ability of nuclear power construction

    International Nuclear Information System (INIS)

    Wu Chongming

    2008-01-01

    Construction is a crucial link in the course of design, site selection, construction and operation for a nuclear power plant. The quality during construction directly affects the nuclear safety. And the construction quality involves various aspects including quality culture, feasibility of construction technique, quality assurance, and quality control. Through technical management innovation, great achievements have been made in the civil construction of Unit 3 of Qinshan II Extension Project. As a result, the construction period was shortened and the concrete quality reached the fairfaced concrete standard. (authors)

  8. The licensing procedure for the construction of power utilities

    International Nuclear Information System (INIS)

    Sturm, C.

    1987-01-01

    The requirement to obtain licences for plants constitutes a form of state control over the construction of power utilities. Under the Federal Pollution Law and the Atomic Energy Law, only the environmental compatibility of the planned plant is verified. Verifications according to the Law on the Fuel and Electricity Industries and the Federal Pollution Law, respectively the Atomic Energy Law and the Law on Power Generation from Coal are effected independently of one another by the different authorities. The granting of licences for the individual power plants may be subject to different laws in each instance. This paper covers only the licensing procedure under the Federal Pollution Law and the Atomic Energy Law. (orig./HSCH) [de

  9. Future plans for the design and construction of fast reactor power stations in the Federal Republic of Germany

    International Nuclear Information System (INIS)

    Kempken, M.; Koehler, M.; Wolff, M.

    1978-01-01

    Some important design features of future fast reactors in the Federal Republic of Germany (FRG) are presented, in particular for the demonstration plant SNR 2 which is to follow the prototype SNR 300, presently under construction in Kalkar. The SNR 2 conceptual design will be based on the SNR 300 design as far as possible. Programmes for the introduction of fast breeder reactor power stations on the part of the governments, the utilities and suppliers are based on broad international co-operation. The FRG is a country which imports a high proportion of its primary energy and it has rather small resources of natural uranium. The natural uranium realistically available to the FRG will allow nuclear energy to play a substantial role in the long-term energy supply only if present uranium utilization based on LWRs is supplemented and replaced by breeder reactor utilization later. To maintain this option, efforts towards the development, design and construction of fast breeder reactors have to be intensively continued in the FRG. The construction of the first large power station with a fast breeder reactor, SNR 2, will, according to present planning, start in the middle of the 80s. Operation can be expected to start at the beginning of the 90s. The present fast breeder programme in the FRG promises to develop reactors, reprocessing and fuel manufacturing plants to such a degree that by the end of this century the introduction of a substantial number of fast reactor power stations will be possible. (author)

  10. Improving quality and the assurance of quality in the design and construction of nuclear power plants: a report to Congress

    International Nuclear Information System (INIS)

    Altman, W.; Ankrum, T.; Brach, W.

    1984-05-01

    A study was conducted of existing and alternative programs for improving quality and the assurance of quality in the design and construction of commercial nuclear power plants. A primary focus of the study was to determine the underlying causes of major quality-related problems in the construction of some nuclear power plants and the untimely detection and correction of these problems. The study concluded that the root cause for major quality-related problems was the failure or inability of some utility managements to effectively implement a management system that ensured adequate control over all aspects of the project. These management shortcoming arose in part from inexperience on the part of some project teams in the construction of nuclear power plants. NRC's past licensing and inspection practices did not adequately screen construction permit applicants for overall capability to manage or provide effective management oversight over the construction project. The study recommends a number of improvements in industry and NRC programs. For industry, the study recommends self-imposed rising standards of excellence, treatment of quality assurance as a management tool, not a substitute for management, improved trend analysis and identification of root causes of quality problems, and a program of comprehensive third party audits of present and future construction projects. To improve NRC programs, the study recommends a heavier emphasis on team inspections and resident inspectors, an enhanced review of new applicant's capabilities to construct commercial nuclear power plants, more attention to management issues, improved diagnostic and trending capabilities, improved quality and quality assurance for operating reactors, and development of guidance to facilitate the prioritization of quality assurance measures commensurate with the importance of plant structures, systems, and components to the achievement of safety

  11. The management of design interfaces in the nuclear power construction

    International Nuclear Information System (INIS)

    Lv Shubao

    2005-01-01

    This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)

  12. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  13. Constructing a sustainable power sector in China: current and future emissions of coal-fired power plants from 2010 to 2030

    Science.gov (United States)

    Tong, D.; Zhang, Q.

    2017-12-01

    As the largest energy infrastructure in China, power sector consumed more coal than any other sector and threatened air quality and greenhouse gas (GHG) abatement target. In this work, we assessed the evolution of coal-fired power plants in China during 2010-2030 and the evolution of associated emissions for the same period by using a unit-based emission projection model which integrated the historical power plants information, turnover of the future power plant fleet, and the evolution of end-of-pipe control technologies. We found that, driven by the stringent environmental legislation, SO2, NOx, and PM2.5 emissions from China's coal-fired power plants decreased by 49%, 45%, and 24% respectively during 2010-2015, comparing to 14% increase of coal consumption and 15% increase in CO2 emissions. We estimated that under current national energy development planning, coal consumption and CO2 emissions from coal-fired power plants will continue to increase until 2030, in which against the China's Intended Nationally Determined Contributions (INDCs) targets. Early retirement of old and low-efficient power plants will cumulatively reduce 2.2 Pg CO2 emissions from the baseline scenario during 2016-2030, but still could not curb CO2 emissions from the peak before 2030. Owing to the implementation of "near zero" emission control policy, we projected that emissions of air pollutants will significantly decrease during the same period under all scenarios, indicating the decoupling trends of air pollutants and CO2 emissions. Although with limited direct emission reduction benefits, increasing operating hours of power plants could avoid 236 GW of new power plants construction, which could indirectly reduce emissions embodied in the construction activity. Our results identified a more sustainable pathway for China's coal-fired power plants, which could reduce air pollutant emissions, improve the energy efficiency, and slow down the construction of new units. However, continuous

  14. Analysis of floor technology scheme in open-top construction of nuclear power project

    International Nuclear Information System (INIS)

    Zhang Shuxia; Lu Qinwu; Han Xiaoping

    2014-01-01

    Open-top construction is general technology in Ⅲ generation in nuclear power project. Because traditional floor structure and its form board upholding doesn't meet open-top construction, four floor scheme are presented, whose characters, advantages and disadvantages, and its application are summarized. The research results will help to the application of open-top construction. (authors)

  15. Nuclear power plants: construction status report, data as of 6/30/82

    International Nuclear Information System (INIS)

    1982-10-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  16. Nuclear power plants: construction status report, data as of 03/31/82

    International Nuclear Information System (INIS)

    1982-06-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  17. Electric power and the global economy: Advances in database construction and sector representation

    Science.gov (United States)

    Peters, Jeffrey C.

    The electricity sector plays a crucial role in the global economy. The sector is a major consumer of fossil fuel resources, producer of greenhouse gas emissions, and an important indicator and correlate of economic development. As such, the sector is a primary target for policy-makers seeking to address these issues. The sector is also experiencing rapid technological change in generation (e.g. renewables), primary inputs (e.g. horizontal drilling and hydraulic fracturing), and end-use efficiency. This dissertation seeks to further our understanding of the role of the electricity sector as part of the dynamic global energy-economy, which requires significant research advances in both database construction and modeling techniques. Chapter 2 identifies useful engineering-level data and presents a novel matrix balancing method for integrating these data in global economic databases. Chapter 3 demonstrates the relationship between matrix balancing method and modeling results, and Chapter 4 presents the full construction methodology for GTAP-Power, the foremost, publicly-available global computable general equilibrium database. Chapter 5 presents an electricity-detailed computational equilibrium model that explicitly and endogenously captures capacity utilization, capacity expansion, and their interdependency - important aspects of technological substitution in the electricity sector. The individual, but interrelated, research contributions to database construction and electricity modeling in computational equilibrium are placed in the context of analyzing the US EPA Clean Power Plan (CPP) CO 2 target of 32 percent reduction of CO2 emissions in the US electricity sector from a 2005 baseline by 2030. Assuming current fuel prices, the model predicts an almost 28 percent CO2 reduction without further policy intervention. Next, a carbon tax and investment subsidies for renewable technologies to meet the CPP full targets are imposed and compared (Chapter 6). The carbon tax

  18. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  19. Construction quality assurance for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs.

  20. Construction quality assurance for nuclear power plants

    International Nuclear Information System (INIS)

    1983-10-01

    This Standard contains the requirements for the quality assurance program applicable to the construction phase of a nuclear power plant. This Standard covers all activities carried out for and by the owner from the receipt of components or materials on the site to their incorporation in systems or structures as required by drawings or other formal engineering information. It also covers the provision of required support activities and equipment and applies at all stages on the site as far as the testing of components or systems before they are submitted for commissioning. 2 figs

  1. Assessment of modular construction for safety-related structures at advanced nuclear power plants

    International Nuclear Information System (INIS)

    Braverman, J.; Morante, R.; Hofmayer, C.

    1997-03-01

    Modular construction techniques have been successfully used in a number of industries, both domestically and internationally. Recently, the use of structural modules has been proposed for advanced nuclear power plants. The objective in utilizing modular construction is to reduce the construction schedule, reduce construction costs, and improve the quality of construction. This report documents the results of a program which evaluated the proposed use of modular construction for safety-related structures in advanced nuclear power plant designs. The program included review of current modular construction technology, development of licensing review criteria for modular construction, and initial validation of currently available analytical techniques applied to concrete-filled steel structural modules. The program was conducted in three phases. The objective of the first phase was to identify the technical issues and the need for further study in order to support NRC licensing review activities. The two key findings were the need for supplementary review criteria to augment the Standard Review Plan and the need for verified design/analysis methodology for unique types of modules, such as the concrete-filled steel module. In the second phase of this program, Modular Construction Review Criteria were developed to provide guidance for licensing reviews. In the third phase, an analysis effort was conducted to determine if currently available finite element analysis techniques can be used to predict the response of concrete-filled steel modules

  2. Welding Metallurgy of Nickel-Based Superalloys for Power Plant Construction

    Science.gov (United States)

    Tung, David C.

    Increasing the steam temperature and pressure in coal-fired power plants is a perpetual goal driven by the pursuit of increasing thermal cycle efficiency and reducing fuel consumption and emissions. The next target steam operating conditions, which are 760°C (1400°F) and 35 MPa (5000 psi) are known as Advanced Ultra Supercritical (AUSC), and can reduce CO2 emissions up to 13% but this cannot be achieved with traditional power plant construction materials. The use of precipitation-strengthened Nickel-based alloys (superalloys) is required for components which will experience the highest operating temperatures. The leading candidate superalloys for power plant construction are alloys 740H, 282, and 617. Superalloys have excellent elevated temperature properties due to careful microstructural design which is achieved through very specific heat treatments, often requiring solution annealing or homogenization at temperatures of 1100 °C or higher. A series of postweld heat treatments was investigated and it was found that homogenization steps before aging had no noticeable effect on weld metal microhardness, however; there were clear improvements in weld metal homogeneity. The full abstract can be viewed in the document itself.

  3. New record in import of electric power in 2000

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    In spite of the mild weather in the year 2000 the electric power consumption in Finland increased by nearly 2%. The electric power consumption would be twice as high if the temperatures would have been the same as usually. Hydroelectric power generation in Norway, Sweden and Finland in 2000 was about 40 TWh higher than in 1999. The retained import of electric power in the year 2000 reached a new record, being 11.9 TWh, corresponding to 15% of the annual power consumption in Finland. The GNP in Finland increased in 2000 by 5.7%, and the estimate for 2001 is 4.5%. Total power consumption in Finland in 2000 was 79.1 TWh, which is 1.7% higher than in 1999. About 60% of the increase were covered by import of electric power and 40 % by increasing own power generation. The share of CHP production was 31% of the total power consumption, the share of nuclear power being 27%, the share of hydroelectric power 18% and that of coal and other common condensing power about 8%. The share of retained electric power import was 15%. The Finnish hydroelectric power plants generated 14.4 TWh electric power, which is nearly 15% more than in 1999. Due to the increased production of hydroelectric power and power import the production of coal and other condensing power decreased nearly 9%. The wind power generation increased rapidly being, however, only about 0.1% of the electric power consumption. Industrial power consumption was about 55% of the total, the share of households and agriculture being nearly 24%, and those of services and public sector over 17%. Power transmission and delivery losses were less than 4%. The electric power consumption of households decreased by nearly 2% due to the worm end of the year. The share of other consumers increased by nearly 3%. About 13 000 households acquired electric heating, so the number of electrically heated houses in Finland is 593 000 households. The industrial electric power consumption increased in 2000 by 2.7% up to 43.2 TWh. The share of

  4. Design, construction and test of RF solid state power amplifier for IRANCYC-10

    Science.gov (United States)

    Azizi, H.; Dehghan, M.; Abbasi Davani, F.; Ghasemi, F.

    2018-03-01

    In this paper, design, simulation and construction of a high power amplifier to provide the required power of a cyclotron accelerator (IRANCYC-10) is presented step-by-step. The Push-Pull designed amplifier can generate 750 W at the operating frequency of 71 MHz continous wave (CW). In this study, achieving the best efficiency of the amplifier, as well as reducing overall volume using baluns, were two important goals. The new offered water-cooled heat sink was used for cooling the amplifier which increases the operating life of the transistor. The gain and PAE of the SSPA were obtained 20 dB and 77.7%, respectively. The simulated and measured RF results are in good agreement with each other. The results show that, using an RF transformer in matching impedance of matching networks, it causes a smaller size and also a better amplifier performance.

  5. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  6. Major factors influencing craft productivity in nuclear power plant construction

    International Nuclear Information System (INIS)

    Borcherding, J.D.; Sebastian, S.J.

    1980-01-01

    This paper reports on a research study whose objective was to determine the most influential factors adversely affecting craft productivity in nuclear power plant construction from the perspective of the tradesmen employed at the sites. Data were collected through the use of a questionnaire survey and group interview sessions, predominantly with workmen, at six nuclear power plant construction projects. Craftsmen were chosen as the major data base because of their awareness of how their time would actually be spent on the project. Topics considered include the factors influencing craft productivity, material availability, redoing work, crew interfacing, overcrowded work areas, instruction time, inspection delays, craft turnover, craft absenteeism, foreman changes, foreman incompetence, engineering design lead time, comprehensive scheduling of the design function, the responsibility of the utility, value engineering, plant standardization, the effective utilization of the planning and scheduling system, and the labor-management committee

  7. Delays in nuclear power plant construction. Progress report, September 15, 1976--September 14, 1977

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.

    1977-01-01

    This report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts that should minimize or eliminate the identified barriers. The identified barriers include: (1) design and construction interfacing problems; (2) problems relating to the selection and use of permanent materials and construction methods; (3) construction coordination and communication problems; and (4) problems associated with manpower availability and productivity;

  8. The importance of building construction materials relative to other factors affecting structure survival during wildfire

    Science.gov (United States)

    Syphard, Alexandra D.; Brennan, Teresa J.; Keeley, Jon E.

    2017-01-01

    Structure loss to wildfire is a serious problem in wildland-urban interface areas across the world. Laboratory experiments suggest that fire-resistant building construction and design could be important for reducing structure destruction, but these need to be evaluated under real wildfire conditions, especially relative to other factors. Using empirical data from destroyed and surviving structures from large wildfires in southern California, we evaluated the relative importance of building construction and structure age compared to other local and landscape-scale variables associated with structure survival. The local-scale analysis showed that window preparation was especially important but, in general, creating defensible space adjacent to the home was as important as building construction. At the landscape scale, structure density and structure age were the two most important factors affecting structure survival, but there was a significant interaction between them. That is, young structure age was most important in higher-density areas where structure survival overall was more likely. On the other hand, newer-construction structures were less likely to survive wildfires at lower density. Here, appropriate defensible space near the structure and accessibility to major roads were important factors. In conclusion, community safety is a multivariate problem that will require a comprehensive solution involving land use planning, fire-safe construction, and property maintenance.

  9. Reactivation of nuclear power plant construction projects. Plant status, policy issues and regulatory options

    International Nuclear Information System (INIS)

    Spangler, M.B.

    1986-07-01

    Prior to the TMI-2 accident on March 28, 1979, four nuclear power plant units that had previously been issued a construction permit were cancelled, principally because of reduced projections of regional power demand. Since that time, an additional 31 units with CPs have been cancelled and eight units deferred. On December 23, 1985 one of the deferred units (Limerick-2) was reactivated and construction resumed. The primary objective of this policy study is to identify the principal issues requiring office-level consideration in the event of reactivation of the construction of one or more of the nuclear power plants falling into two categories: (1) LWR units issued a construction permit whose construction has been cancelled, and (2) LWR units whose construction has been deferred. The study scope is limited to identifying regulatory issues or questions deserving analysis rather than providing, at this time, answers or recommended actions. Five tasks are addressed: a tabulation and discussion of the status of all cancelled and deferred LWR units; and identification of potential safety and environmental issues; an identification of regulatory or policy issues and needed information to determine the desirability of revising certain rules and policies; and identification of regulatory options and decision criteria; and an identification of decision considerations in determining staff requirements and organizational coordination of LWR reactivation policy and implementation efforts. 41 refs

  10. 150 years of electrical engineering. A review and future prospects for power plant construction; 150 Jahre Elektrotechnik. Rueckblick und Vision im Kraftwerksbau

    Energy Technology Data Exchange (ETDEWEB)

    Boehm, H. [Siemens AG Unternehmensbereich KWU, Erlangen (Germany). Bereich Energieerzeugung

    1997-12-01

    The development of power plant construction both in the last 150 years and also relative to the deduced major trends for the future is illustrated by the important milestones. In this respect, the important role of modern power stations is very prominent in ensuring enduring economic development. (orig.) [Deutsch] Anhand von wichtigen Meilensteinen wird die Entwicklung im Kraftwerksbau sowohl in den letzten 150 Jahren als auch entsprechend den sich abzeichnenden grossen Trends fuer die Zukunft beleuchtet. Dabei steht die wichtige Rolle moderner Kraftwerke fuer eine nachhaltige Entwicklung im Vordergrund. (orig.)

  11. Case study: Proposed application of project management techniques for construction of nuclear power plant in Malaysia

    International Nuclear Information System (INIS)

    Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli

    2010-01-01

    This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)

  12. Credit Risk Evaluation of Large Power Consumers Considering Power Market Transaction

    Science.gov (United States)

    Fulin, Li; Erfeng, Xu; ke, Sun; Dunnan, Liu; Shuyi, Shen

    2018-03-01

    Large power users will participate in power market in various forms after power system reform. Meanwhile, great importance has always attached to the construction of the credit system in power industry. Due to the difference between the awareness of performance and the ability to perform, credit risk of power customer will emerge accordingly. Therefore, it is critical to evaluate credit risk of large power customers in the new situation of power market. Firstly, this paper constructs index system of credit risk of large power customers, and establishes evaluation model of interval number and AHP-entropy weight method.

  13. Progressive building methods in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sikura, V.

    1980-01-01

    A detailed description is given of the new prospective technologies used in the construction of the Bohunice V-1 nuclear power plant. They include the use of steel and large-area forms, the use of profile sheets as a substitute for forms, assembled raw partitions, wall shells consisting of clamped porous concrete slabs, assembled roof shells, special finish of concrete walls, bearing wall deep foundation, the use of modern building machinery for concreting, reinforcing and welding works. (M.S.)

  14. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  15. Projecting labor demand and worker immigration at nuclear power plant construction sites: an evaluation of methodology

    International Nuclear Information System (INIS)

    Herzog, H.W. Jr; Schlottmann, A.M.; Schriver, W.R.

    1981-12-01

    The study evaluates methodology employed for the projection of labor demand at, and worker migration to, nuclear power plant construction sites. In addition, suggestions are offered as to how this projection methodology might be improved. The study focuses on projection methodologies which forecast either construction worker migration or labor requirements of alternative types of construction activity. Suggested methodological improvements relate both to institutional factors within the nuclear power plant construction industry, and to a better use of craft-specific data on construction worker demand/supply. In addition, the timeliness and availability of the regional occupational data required to support, or implement these suggestions are examined

  16. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  17. Construction Technologies for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2011-01-01

    One of the IAEA's statutory objectives is to 'seek to accelerate and enlarge the contribution of atomic energy to peace, health and prosperity throughout the world'. One way this objective is achieved is through the publication of a range of technical series. Two of these are the IAEA Nuclear Energy Series and the IAEA Safety Standards Series. According to Statute Article III, A.6, the IAEA safety standards establish 'standards of safety for protection of health and minimization of danger to life and property.' The safety standards include the Safety Fundamentals, Safety Requirements and Safety Guides. These standards are written primarily in a regulatory style, and are binding on the IAEA for its own programmes. The principal users are the regulatory bodies in Member States and other national authorities. The IAEA Nuclear Energy Series comprises reports designed to encourage and assist R and D on and practical application of, nuclear energy for peaceful uses. This includes practical examples to be used by owners and operators of utilities in Member States, implementing organizations, academia, and government officials, among others. This information is presented in guides, reports on technology status and advances, and best practices for peaceful uses of nuclear energy based on inputs from international experts. The IAEA Nuclear Energy Series complements the IAEA Safety Standards Series. There are three distinct significant phases in a nuclear power plant (NPP) project after the signing of a contract; engineering, procurement, and construction and commissioning. Experience gained over the last forty years has shown that the construction phase is one of the most critical phases for the success of a project. Success is defined as completing the project with the specified quality, and within budget and schedule. The key to a successful construction project is to have an established programme that integrates the critical attributes into the overall project. Some of

  18. Licensing for the construction of 'Almirante Alvaro Alberto' nuclear power plant

    International Nuclear Information System (INIS)

    1974-09-01

    The BRAZILIAN NUCLEAR ENERGIA COMMISSION (Comissao Nacional de Energia Nuclear - CNEN) presents in Report n 0 51 of its Reactors Department all the requirements for the construction permit of 'Almirante Alvaro Alberto' Nuclear Power Plant [pt

  19. Cyber-physical-social systems and constructs in electric power engineering

    CERN Document Server

    Suryanarayanan, Siddharth; Roche, Robin

    2016-01-01

    Cyber-physical-social systems (CPSS) integrate computing, physical assets and human networks. Divided into four application areas to the electric grid, this book describes state-of-the-art CPSS in electric power systems, including detailed approaches on social constructs which are a critical aspect of the end-user realm.

  20. Financing aspects of nuclear power plant construction under Polish economic conditions

    International Nuclear Information System (INIS)

    Besant-Jones, John E.

    1999-01-01

    Within the framework of the new Polish Energy Law the different issues important far financing a programme to develop nuclear power power in Poland such as: economic competitiveness of nuclear power, financing options for nuclear power projects, managing the various risks for financing nuclear power as well as nuclear and business liability are considered. The importance of policy issues is stressed

  1. Construction of Kashiwazaki-Kariwa Nuclear Power Station Results of manufacturing concrete

    International Nuclear Information System (INIS)

    Morishita, Hideki; Tsuchiya, Yoshimasa; Eguchi, Kiyoshi; Hosaka, Hiroshi

    1998-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station of Tokyo Electric Power Co., Inc. was completed in July, 1997. Seven nuclear power plants generate about 8.2 million kW, and it is the largest nuclear power station in the world. In the construction, from May, 1980 to August, 1996, the concrete of 2.42 million m 3 for architecture and 1.04 million m 3 for civil engineering, 3.46 million m 3 in total, and the mortar for artificial rock bed of 430,000 m 3 were manufactured and placed. The results of manufacturing concrete from beginning to finish are shown. The specification of concrete was different for No. 1 plant, No. 2 and 5 plants, No. 3 and 4 plants and No. 6 and 7 plants. As to the mixing of concrete, the specification and the materials used are reported. The features of the facilities for manufacturing concrete are explained. The flowchart of the quality control of materials and concrete is shown. The material testing of cement and aggregate, the test of water quality and the material testing of admixtures were carried out. As for concrete, the weight of unit volume, slump, air quantity, concrete temperature, chloride content, strength and alkali reactivity were examined. (K.I.)

  2. Construction status report: nuclear power plants, data for decisions. Status report

    International Nuclear Information System (INIS)

    1976-01-01

    The document is the 28th edition summarizing the results of a management information system established by the Executive Director for Operations on the construction/fuel load activities of nuclear power plants. The report uses data collected from applicants sponsoring these projects, Office of Inspection and Enforcement, and the Office of Standards Development; and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of 87 plants authorized to engage in construction in Region I through V is summarized in this document. This total includes (4) plants with construction exemptions, and (14) plants with an LWA

  3. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  4. Nuclear power plant construction and financial assistance - as regards subsidies for promotion of power plant siting

    International Nuclear Information System (INIS)

    Shindo, M.

    1983-01-01

    This paper describes the institutional framework for the granting of subsidies in particular to promote nuclear power plant construction in Japan. It also analyses the technical criteria applied and lists the type of improvements to various facilities and equipment made with such subsidies. (NEA) [fr

  5. Examining “Elite” Power Dynamics in Informant–Research Relations and Its Impact on Ethnographic Data Construction

    Directory of Open Access Journals (Sweden)

    Jana Declercq

    2017-04-01

    Full Text Available This article explores how power dynamics between informants and field researchers shape ethnographic data construction, drawing on fieldwork at a pharmaceutical company. Pharmaceutical companies are considered elite settings, and often assumed to be powerful in relation to the researcher and dominating the data construction. However, such a view conceptualizes power in terms of fixed categories, in which there is a superior and subordinate position. We reconsider the impact of elite informants in the light of a constructivist, interactionist view on power, in which power is dynamic and not necessarily entailing domination. We answer the following research questions: (1 How can we observe power dynamics, as conceptualized in a constructionist and interaction orientation, in ethnographic research? and (2 How can we reflect on what these power dynamics mean for data construction, based on our experiences in elite settings? To do so, we make use of discursive and interactional analytic methods and propose three levels of analysis: (1 the level of conversation, (2 the level of ethnography, and (3 the level of the organization in society. They respectively shed light on power in relation to (1 what is said and how, (2 the meanings attached to the ethnographic events, and (3 the meaning of the ethnography in relation to the discourses on the organization in society. With this article, we aim to provide researchers with a methodological tool to approach and to reflect on the significance of power relations in the context of ethnography and interviewing and its impact on data construction.

  6. Nuclear power plants. Construction status report, data as of September 30, 1977

    International Nuclear Information System (INIS)

    1977-10-01

    The report provides information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. T he status of 93 plants authorized to engage in construction activities is summarized. This total includes (4) plants with construction exemptions, and (11) plants with Limited Work Authorization Permits

  7. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  8. Rock cavity construction of a nuclear power plant: a case study

    International Nuclear Information System (INIS)

    Loken, P.C.; Bakke, J.; Gloersen, I.

    1979-01-01

    The major findings of a comprehensive study of the major aspects of rock cavity construction of a large nuclear power plant are: (1) current technology is adequate for the realization of such construction; (2) a method for estimating the probability of rock fallout and gross cavity instability is presently not available; (3) certain design modifications and amplifications must be made to prevent dependent failures; (4) no significant reduction in the immediate radiological effects of Class 9 accidents will result unless special design measures are made for this purpose; (5) the vulnerability of the plant to certain external effects is significantly reduced; (6) the total time for the realization of such construction will be significantly longer than that for a traditionally constructed plant; and (7) the extra cost will be substantial

  9. Forecasting manpower requirements for nuclear power plant construction

    International Nuclear Information System (INIS)

    Seltzer, N.; Schriver, W.R.

    1978-01-01

    This paper presents both the methodology and results of a segment of a comprehensive construction manpower demand forecasting system aimed at forecasting virtually all construction manpower requirements in the United States of America. The part of the system dealing with the demand for construction workers needed to build nuclear powered electricity generating plants is discussed here. The object of the system is to forecast manpower construction needs for each of 29 construction crafts on a monthly basis in each of 10 geographical regions of the United States. The method used is to establish profiles of the types of workers and time phasing required in the past. Profiling was done for different types of plants, different capacity classes, and different geographical locations. An appropriate worker profile matrix cannot simply be multiplied by the capacity of the proposed plant if the number of man-hours required per kilowatt of generating capacity is not constant. The value of this latter variable has changed considerably recently - presumably because of an increased awareness of environmental and safety considerations. Econometric techniques are used to forecast values for man-hours per kilowatt which are then multiplied by projected new capacity to be put in place. The resulting total man-hour requirement is then allocated over time and by craft through use of a worker profile matrix. The summary results indicate that 20 percent increases in man-hours required per kilowatt of capacity can be expected between 1977 and 1981. Total construction labour demand will rise from 65,700 work-years in 1977 to nearly 96,600 work-years in 1981. Forecasts of the actual number of different types of workers to be demanded in each month and in each region are available from the system. (author)

  10. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  11. The quality control for biological-shield heavy concrete construction of nuclear power project

    International Nuclear Information System (INIS)

    Sun Hongjun; Ma Xinchao

    2012-01-01

    The paper introduces the function and characteristics of biological protective heavy-concrete, and its main application scope and role in Fangjiashan nuclear power project. From the aspects of raw material selection, mixing ratio test, heavy concrete production, the paper discusses the main control points of heavy concrete construction process, points out the basic characteristics of heavy concrete construction, and put forward measures to prevent density non-uniformity during heavy concrete construction and to control slump during transportation. Results prove that reasonable construction process control can assure the engineering quality. (authors)

  12. State of the art and further development of reinforced concrete wall cells for nuclear power plant construction

    International Nuclear Information System (INIS)

    Uhlemann, E.; Wartenberg, J.

    1985-01-01

    Reinforced concrete wall cells have been developed for nuclear power plant construction by the USSR and GDR. In this article, a new type of these cells, which will be used for constructing auxiliary equipment of the Stendal nuclear power plant, is described

  13. 'Concrete shell formwork' technology applied to the construction of the Paks Nuclear Power Plant

    International Nuclear Information System (INIS)

    Fejes, A.

    1982-01-01

    The conventional formworking technology could not meet the unusual requirements needed in constructing the concrete walls of the nuclear power plant building. A new concrete shell formworking developed in the Soviet Union has been adapted to meet the criteria. Prefabricated concrete shells are mounted separately during construction on separated parts of the reinforcing structure. The steps of the construction process are described with the economic evaluation of this new construction technology. (R.P.)

  14. C.A.R. insurance and its significance in the construction of power plants

    International Nuclear Information System (INIS)

    Friedrich, J.

    1975-01-01

    The construction of a power lant entails a multitude of risks for the operator and for all parties participating in the construction. The progress of construction technology, reduced manufacturing times and new construction materials and methods result in greater risks. As a property insurance, C.A.R. insurance covers unforeseen destruction of or damage to the construction works from commencement of construction until handling over. It is thereby irrelevant whether such loss or damage falls to the burden of the principal or the contractors and craftsmen. In the event of loss or damage occurring, the search for those responsible is thus eliminated. Rectification of the loss or damage and continuation of the work is not delayed. (orig.) [de

  15. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience-Factor Model for civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (Author) [pt

  16. The Brazilian experience in the civil construction of nuclear power plants

    International Nuclear Information System (INIS)

    Gonzaga, L.A.

    1985-01-01

    The processes and phases of technology absorption, together with the resultant Experience Factor Model for Civil Works, considering philosophy of operation of the civil contractor, design aspects and some structural influences for constructing nuclear power plants are presented. (author) [pt

  17. Privatisation electric power sector in Pakistan: some important issues

    International Nuclear Information System (INIS)

    Ghafoor, A.; Weiss, J.

    1998-01-01

    This discussion paper highlights important issues relating to the privatisation of Pakistan's electric power sector. Salient features of the electric power sector in Pakistan, factors affecting the economic performance of this sector, the partial privatisation policy adopted by Pakistan, ongoing private power projects, and current privatisation policy are examined. The arguments for competition are raised, and alternative policy reforms the are considered

  18. Facilitating Constructive Alignment in Power Systems Engineering Education Using Free and Open-Source Software

    Science.gov (United States)

    Vanfretti, L.; Milano, F.

    2012-01-01

    This paper describes how the use of free and open-source software (FOSS) can facilitate the application of constructive alignment theory in power systems engineering education by enabling the deep learning approach in power system analysis courses. With this aim, this paper describes the authors' approach in using the Power System Analysis Toolbox…

  19. Construction and evaluation of photovoltaic power generation and power storage system using SiC field-effect transistor inverter

    International Nuclear Information System (INIS)

    Oku, Takeo; Matsumoto, Taisuke; Ohishi, Yuya; Hiramatsu, Koichi; Yasuda, Masashi; Shimono, Akio; Takeda, Yoshikazu; Murozono, Mikio

    2016-01-01

    A power storage system using spherical silicon (Si) solar cells, maximum power point tracking charge controller, lithium-ion battery and a direct current-alternating current (DC-AC) inverter was constructed. Performance evaluation of the DC-AC inverter was carried out, and the DC-AC conversion efficiencies of the SiC field-effect transistor (FET) inverter was improved compared with those of the ordinary Si-FET based inverter

  20. Construction and evaluation of photovoltaic power generation and power storage system using SiC field-effect transistor inverter

    Energy Technology Data Exchange (ETDEWEB)

    Oku, Takeo, E-mail: oku@mat.usp.ac.jp; Matsumoto, Taisuke; Ohishi, Yuya [Department of Materials Science, The University of Shiga Prefecture, 2500 Hassaka, Hikone, Shiga 522-8533 (Japan); Hiramatsu, Koichi; Yasuda, Masashi [Collaborative Research Center, The University of Shiga Prefecture, 2500 Hassaka, Hikone, Shiga 522-8533 (Japan); Shimono, Akio; Takeda, Yoshikazu [Kyoshin Electric Co. Ltd., 18, Goshonouchi-Nishimachi, Shichijo, Shimogyou-ku, Kyoto 600-8865 (Japan); Murozono, Mikio [Clean Venture 21 Co., 38 Ishihara Douno-Ushirocho, Kissyouin, Minami-ku, Kyoto 601-8355 (Japan)

    2016-02-01

    A power storage system using spherical silicon (Si) solar cells, maximum power point tracking charge controller, lithium-ion battery and a direct current-alternating current (DC-AC) inverter was constructed. Performance evaluation of the DC-AC inverter was carried out, and the DC-AC conversion efficiencies of the SiC field-effect transistor (FET) inverter was improved compared with those of the ordinary Si-FET based inverter.

  1. Risks and challenges associated with the design and construction of a nuclear power plant; Control de riesgos y retos asociados al diseno y construccion de una central nuclear

    Energy Technology Data Exchange (ETDEWEB)

    Liebana Martinez, B.; Armas Garcia, A.; Martinez Gozalo, I.

    2011-07-01

    The construction of a nuclear power plant project, considering the period prior to the operation of the plant, requires a very strict risk control to ensure compliance with a series of challenges. The present paper identifying the most important challenges facing the construct ability and license requirements of the process, identifying the interfaces and proposing a methodology of construction to meet the challenge of a construction process in 5 years.

  2. Nuclear power plants in Europe 1996. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1996. The 'Nuclear Power Plants in Europe 1996' atw report singles out the main events and lines of development. As per August 1996, 216 (1995: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,916 (177,010) MWe installed gross capacity are in operation and 24 (26) units with 23,086 (24,786) MWe are under construction in seven countries. This adds up to a total of 240 (241) nuclear generating units with an aggregate 201,002 (201,796) MWe. In the nuclear power plants in Europe, some 1067 (1048) TWh of nuclear power was converted into electric power in 1995; 802 (792) TWh of this aggregate was converted in 142 (137) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 86 (77)% has the highest share of nuclear power in Europe, followed by France with 76 (75)% and Belgium with 56%. The lowest percentage, only 4 (5)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power are operated, such as Italy or Austria. (orig.) [de

  3. Will nuclear power plant standardization reduce the licensing impact on construction

    International Nuclear Information System (INIS)

    Allen, J.M.; Bingham, W.G.; Keith, D.G.

    1976-01-01

    The NRC and the nuclear industry have been pursuing standardization quite vigorously in an effort to reduce the cost and schedule for the design and construction of nuclear power plants. The NRC is currently reviewing standard plant applications submitted under each of four standardization options. In addition, the NRC has published Standard Review Plans and Standard Technical Specifications. Although problems exist in the implementation of standardization and in areas unaffected by standardization, each of these standardization methods has the potential to reduce the licensing impact on construction

  4. Outline of preparation construction of Shimane Nuclear Power Station No.3

    International Nuclear Information System (INIS)

    Oda, Yasuhiro; Sasaki, Yutaka; Matsukage, Shigeo; Kawahara, Kazufumi

    2004-01-01

    The preparation construction of Shimane Nuclear Power Station No.3 (No.3) started on 15th March in 2004. The main preparation construction consist of the site preparation, revetment works, breakwater works, production of blocks, flood-way and outlet works. The outline of the project is described by the time schedule of work, the cross section of site preparation, site, the revetment method used, the cross section of representative breakwater, structure style and improvement works of flood-way and outlet and content of each works. (S.Y.)

  5. Long-term prospects of capital demands of nuclear power sources construction in Czechoslovakia

    International Nuclear Information System (INIS)

    Sladek, V.; Kysel, J.

    1988-01-01

    The capital demands are compared for four variants of nuclear power plant construction projects to be implemented in Czechoslovakia by the year 2030. By the year 2000, all variants are expected to achieve the total installed capacity of 11,280 MW. Construction in the following period then differs: by the year 2030 total installed nuclear capacity is to reach the following values: 1st variant - 30,000 MW; 2nd variant - 35,000 MW, 3rd variant - 36,500 MW and 4th variant - 27,760 MW. WWER-1000, WWER-1500 and WWER-500 reactors are expected to be installed in the variant projects which differ in speed of construction and life of the units. They are designed such as to provide for the smooth transfer of building workers from one site to the next. The comparison of capital demands shows that a suitable siting strategy and site preparation can save costs and preclude serious sociological problems. The possible extension of the life of nuclear power plants will provide for a better use of primary investments and improve the economic efficiency of nuclear power plants. (Z.M.). 2 figs., 4 tabs., 6 refs

  6. Psychologization, constituent power and autonomy: Rethinking subjectivity construction in post-modernity

    Directory of Open Access Journals (Sweden)

    Jorquera Fariñas, Víctor

    2007-11-01

    Full Text Available According to influential theories of identity in post-modernity, as community bonds loosen, individuals have increasing discretion in the construction of their own identity. In this article we argue for seeing modernization as the progressive psychologization of subjectivity. That reveals the mechanisms of what we can call, following Foucault, "constituent power": a power that turns the psychological subject's conflicts away from external objects and towards an inner world. It is that inner conflict that promotes the modern preoccupation with identity.

  7. Rationalization of design and construction of buildings for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-02-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.).

  8. Rationalization of design and construction of buildings for nuclear power plants

    International Nuclear Information System (INIS)

    Satoh, Shunsaku; Mitsumatsu, Kazuo

    1987-01-01

    This article presents various rationalization methods introduced in the past few years for design and construction of BWR nuclear power plant buildings. When the site for a nuclear power plant has been decided, investigation is made on various aspects of possible earthquakes, based on which anti-earthquake design for the plant site is established. The next step is to examine the displacements and stresses that may occur to various parts of the bulding from a postulated earthquake. This is normally called the earthquake response analysis and consists of calculating the behaviors of the buildings using large computers. A seismic controlled structure system has recently proposed, aiming to reduce the displacements and stresses of the building itself by controlling the flexibility of the installed seismic apparatus against the input of external loads. Lately, high strength concrete and high strength reinforcing steel bars (rebars) are being considered for practical application. If advanced computers and related accessories are utilized to the maximum, it will lead not only to efficiency in the design work but to the possibility of optimized design. For rational construction, a combined scaffolding and temporary support has been devised to reduce the time and volume of required temporary work. What have been developed for rationalization of construction work also include robots for heavy weight rebar fabrication, horizontal reed blind type rebars, portable concrete distributor, all weather environment facilities, and construction materials conveyance system. (Nogami, K.)

  9. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  10. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  11. Construction of a power plant with prototype DLN combustion turbines

    Energy Technology Data Exchange (ETDEWEB)

    Wilkinson, M.L. [CSW Energy, Dallas, TX (United States); Drummond, L.J. [Zurn NEPCO, Redmond, WA (United States)

    1996-12-31

    Design and construction of a power plant is always a difficult process and this is especially true when the main keystone, the combustion turbine engine, is being modified by the manufacturer resulting in numerous changes in the design interfaces. The development of the design and construction of the Orange Cogeneration Facility has been in parallel with major modification of the LM6000 to DLE technology (a Dry Low NO{sub x} combustion system). The Dry Low NO{sub x} Combustion System for a combustion turbine offered a means to reduce water usage, lower Zero Liquid Discharge System operating costs and reduce emissions to meet Florida Department of Environmental Protection requirements. This development was successfully accomplished by Owner, EPC contractor and Combustion Turbine Manufacturer by maintaining flexibility in the design and construction while the design interfaces and performance of the combustion turbines were being finalized.

  12. Economical and industrial impact of nuclear power stations construction in Belgium

    International Nuclear Information System (INIS)

    Labrique, J.; Klees, P.

    1981-01-01

    After a brief introduction the paper analyses the employment in the Belgian nuclear sector with regard to construction, the operation, the engineering of nuclear power plants as well as fuel reprocessing. In the economical section a comparison of the kWh cost of different sources is presented as well as the seasibility of this cost to the raw material price. The future installation of nuclear power plants is discussed and the impact of its delay on the Belgian economy by an absence of decision is analyzed. (AF)

  13. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  14. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  15. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  16. A majority in favour of the construction of further nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1978-01-01

    The results of an opinion poll of 5000 German-speaking persons in Bern Canton, Switzerland are summarised and commented on. 54% of those questioned expressed approval of further nuclear power station construction in Switzerland. (F.Q.)

  17. Management self-assessment in construction phase of nuclear power station

    International Nuclear Information System (INIS)

    Shao Bixiu

    2004-01-01

    Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective

  18. Pretension construction of safety shell in Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Gong Zhenbin; Li Yinong; Ni Shaowen

    1999-01-01

    19T16 post-tension grouped anchor system is applied to the safety shell pretension in Chashma Nuclear Power Plant. The stretching force of each bundle is about 3800 kN and the prestressed reinforcement is stretched in five stages. The double-control measurement of stress controlling and extension checking is applied in strict accordance with the principle of symmetrical construction

  19. Site infrastructure as required during the construction and erection of nuclear power plants

    International Nuclear Information System (INIS)

    Haas, K.F.; Wagner, H.

    1978-01-01

    In general, in an exchange of experience on constructing nuclear power plants priority is given to design and lay-out, financing, quality assurance etc., but in this paper an attempt has been made to describe range and type of site infrastructure required during construction and erection. Site infrastructure will make considerable demands on the planning, supply of material and maintenance that may result from the frequently very isolated location of power plant sites. Examples for specific values and experiences are given for a nuclear power plant with two units on the 1300-MW type at present under construction of the Persian Gulf in Iran. Data concerning the site infrastructure, including examples, are given and explained on the basis of graphs. The site is split up into a technical and a social infrastructure. The main concern of the technical site infrastructure is the timely provision and continuous availability of electric energy, water, communication grids, workshops, warehouses, offices, transport and handling facilities, as well as the provision of heavy load roads, harbour facilities, etc. The social site infrastructure in general comprises accommodation, food supplies and the care and welfare of all site personnel, which includes a hospital, school, self-service shop, and sport and recreation facilities. (author)

  20. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  1. 1997: Nuclear power plants in Europe. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1997. The '1997: Nuclear Power Plants in Europe' atw report singles out the main events and lines of development. As per August 1997, 216 (1996: 216) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 180, 184 (177, 916) MWe installed gross capacity are in operation and 22 (24) units with 20,054 (23,086) MWe are under construction in seven countries. This adds up to a total of 238 (240) nuclear generating units with an aggregate 200,238 (201,002) MWe. In the nuclear power plants in Europe, some 1138 (1067) TWh of nuclear power was converted into electric power in 1996: 806 (802) TWh of this aggregate was converted in 142 (142) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 35,4 (36,0)%. Lithuania, with 83,4 (85,6)% has the highest share of nuclear power in Europe, followed by France with 77,4 (76,0)% and Belgium with 57,2 (55,5)%. The lowest percentage, only 4,8 (3,8)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power is operated, such as Italy or Austria. (orig.) [de

  2. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  3. The atmospheric corrosion, important technical and economic factor in the construction of nuclear power plants

    International Nuclear Information System (INIS)

    Rodriguez, R.; Diaz, J.; Gomez, J.; Rodriguez, J.

    1995-01-01

    In order to determine the atmospheric effects of the construction of the Juragua NPP some experiments were performed in the reactor site. Samples of carbon steel were placed in experimental stations and the consequent oxidation was measured. The results show that the region's atmosphere aggressiveness may be classified from low to median. 11 refs

  4. Psychologization, constituent power and autonomy: Rethinking subjectivity construction in post-modernity

    Directory of Open Access Journals (Sweden)

    Víctor Jorquera Fariñas

    2007-11-01

    Full Text Available According to influential  theories of identity in post-modernity,  as community bonds loosen, individuals  have increasing discretion in the construction of their own identity.  In this article we argue for seeing modernization as the progressive psychologization of subjectivity. That reveals the mechanisms of what we can call, following Foucault, "constituent power": a power that turns the psychological subject's conflicts  away from external objects and towards an inner world. It is that inner conflict that promotes the modern preoccupation with identity.

  5. Approaches to assessment of socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The paper informs of solving the task of economic evaluation of transient and permanent social consequences of the construction and operation of nuclear power plants. The solution takes place in three stages: 1. drafting of methodology, 2. trial of methodology in localities of current nuclear power plant construction, 3. analysis of results and finalizing of methodology. The task is aimed at studying the questions of the return and profitability of investments, the evaluation of optimal economic lifetime, and the effective restoration of basic funds. Its model solution shows the national economy relations of nuclear power. Also discussed is the question of the use of non-balance heat from nuclear power plants. (E.S.)

  6. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  7. Effects of power-line construction on wetland vegetation in Massachusetts, USA

    Science.gov (United States)

    Nickerson, Norton H.; Dobberteen, Ross A.; Jarman, Nancy M.

    1989-07-01

    Utility rights-of-way corridors through wetland areas generate long-term impacts from construction activities to these valuable ecosystems. Changes to and recovery of the vegetation communities of a cattail marsh, wooded swamp, and shrub/bog wetland were documented through measurements made each growing season for two years prior, five years following, and again on the tenth year after construction of a 345-kV transmission line. While both the cattail marsh and wooded swamp recovered within a few years, measures of plant community composition in the shrub/bog wetland were still lower, compared to controls, after ten years. Long-term investigations such as the one reported here help decrease uncertainty and provide valuable information for future decision making regarding construction of power utility lines through valuable and dwindling wetland resources.

  8. Business data processing in the service of quality and safety in nuclear power plant construction

    International Nuclear Information System (INIS)

    Chassignet, C.

    1980-01-01

    Construction of a nuclear power plant implies collection and correlation of several thousand items of information which must be identified and which must remain retrievable throughout the service life of the plant. The Framatome Corporation, which has one of the largest nuclear power plant construction programs in the world, therefore set up a processing and checking system for the documents containing this information. The author describes the functions and principles of this system (known as SHARAD), together with its technical data and its operation [fr

  9. Fostering of Innovative Talents Based on Disciplinary Construction: HRD Strategy of Chinese Nuclear Power Industry

    International Nuclear Information System (INIS)

    Ye Yuanwei

    2014-01-01

    Workforce challenge to nuclear power industry: • We are facing the aging workforce and talent loss since the tough time of nuclear power industry. • Professional workforce fostering in nuclear power industry always needs a long period of time. • Professional workforce fostering in nuclear power industry is a systematic and interdisciplinary work. Talents fostering in nuclear power industry: Major measures → national overall planning; engineering practice; knowledge management; disciplinary construction; cooperation and communication

  10. Construction of an experimental plot seeder of wheat planting and compare it by imported one

    Directory of Open Access Journals (Sweden)

    I Eskandari

    2016-09-01

    spinner can be equipped with a 4 or 6 outlet delivery head, depending on row spacing. The planter is fitted with hoe openers. Alternatively, spear-point openers have sometimes been used under conventional tillage systems. Seeding depth control was achieved by an adjustment screw handle. The plot seeder is being moved by a 9.6 kW engine, and has been successfully used in applications. Field experiment established by using 4 plot length (2, 3, 4 and 6 with 4 replication by the constructed plot seeder and imported plot seeder. Crop measurements were planted height, spike m-2, seeds/spike, Thousand kernel weight, Biological and grain yield, harvest index and drill measurements were seeding depth, uniformity of row spacing in action, seed counter performance, power requirement, slippage evenly of rows after planting. Results and Discussion Results showed that there were significant differences between the plant emergences. The emergencies were higher in plots, which planted by the new plot seeder. The differences between seed distribution of openers were insignificant, but the variances of new plot seeder and imported plot seeder were 0.267 and 1.05 respectively. Mean planting depth of plots planted by the Wintersteiger plot seeder was 0.8 cm shallower than the adjusted planting depth while mean planting depth in plots planted by constructing machine had only 0.01 cm variation. Results of variance analysis revealed that effect of treatments on wheat grain yield and yield components was significant. So that, highest grain yield (4216 kgha-1, biological yield (8704 kgha-1, number of spikes per square meter (649spike, obtained from a plot which planted by constructed plot seeder. Increasing yield of treatments which planted by constructed plot seeder might be because of increasing the number of spikes per square meter in those treatments. The mean of spike per square meter in plots of new planter was 691 spikes which were116 spike more than plots planted by imported plot seeder

  11. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  12. The Import-Substitution Adaptation of Power Engineering Programs

    Directory of Open Access Journals (Sweden)

    Aleksandr N. Kuzminov

    2017-03-01

    Full Text Available The realization problem of the import substitution policy in the context of existing programs for the individual branches development is considered in the paper on the example of power engineering. There is a contradiction to the objective of programs reflected in the process of alignment, which consists in stabilizing on the one hand and on the development of innovative on the other hand. In addition, the analysis of the implementation of power engineering of the Russian Federation for 2010-2020 and up to 2030 revealed significant shortcomings and deficiencies that reinforce the negative trends of this pairing. Classification of problems and purpose allowed choosing the most significant conceptual directions, methodologically based on the ideas of self-organization and balance, which can get instrumentality software by adapting programs for the development of power engineering in the system of the European model of Industry 4.0. As a fundamental position addresses the need for such a project, which would ensure the greatest impact with limited resources, including public funding, which lags far behind foreign. It is proposed to transform the efforts to implement the existing strategies of industry development in view of the policy of import substitution based on the implementation of the program of production of a balanced range of innovative products and providing replacement of imported equipment and the formation of the technological basis for the development of the industry

  13. Big Data is a powerful tool for environmental improvements in the construction business

    Science.gov (United States)

    Konikov, Aleksandr; Konikov, Gregory

    2017-10-01

    The work investigates the possibility of applying the Big Data method as a tool to implement environmental improvements in the construction business. The method is recognized as effective in analyzing big volumes of heterogeneous data. It is noted that all preconditions exist for this method to be successfully used for resolution of environmental issues in the construction business. It is proven that the principal Big Data techniques (cluster analysis, crowd sourcing, data mixing and integration) can be applied in the sphere in question. It is concluded that Big Data is a truly powerful tool to implement environmental improvements in the construction business.

  14. Enhanced Matrix Power Function for Cryptographic Primitive Construction

    Directory of Open Access Journals (Sweden)

    Eligijus Sakalauskas

    2018-02-01

    Full Text Available A new enhanced matrix power function (MPF is presented for the construction of cryptographic primitives. According to the definition in previously published papers, an MPF is an action of two matrices powering some base matrix on the left and right. The MPF inversion equations, corresponding to the MPF problem, are derived and have some structural similarity with classical multivariate quadratic (MQ problem equations. Unlike the MQ problem, the MPF problem seems to be more complicated, since its equations are not defined over the field, but are represented as left–right action of two matrices defined over the infinite near-semiring on the matrix defined over the certain infinite, additive, noncommuting semigroup. The main results are the following: (1 the proposition of infinite, nonsymmetric, and noncommuting algebraic structures for the construction of the enhanced MPF, satisfying associativity conditions, which are necessary for cryptographic applications; (2 the proof that MPF inversion is polynomially equivalent to the solution of a certain kind of generalized multivariate quadratic (MQ problem which can be reckoned as hard; (3 the estimation of the effectiveness of direct MPF value computation; and (4 the presentation of preliminary security analysis, the determination of the security parameter, and specification of its secure value. These results allow us to make a conjecture that enhanced MPF can be a candidate one-way function (OWF, since the effective (polynomial-time inversion algorithm for it is not yet known. An example of the application of the proposed MPF for the Key Agreement Protocol (KAP is presented. Since the direct MPF value is computed effectively, the proposed MPF is suitable for the realization of cryptographic protocols in devices with restricted computation resources.

  15. Quality control for the construction of Ikata Nuclear Power Station No. 2 Unit

    International Nuclear Information System (INIS)

    Onishi, Akiyoshi

    1983-01-01

    In the construction of No. 2 unit in Ikata Nuclear Power Station, Shikoku Electric Power Co., the quality control was practiced making effective use of the experience in preceding stations including the Three Mile Island station, U.S., and improving those. The construction works were also performed in consideration of ensuring the safe running of No. 1 unit in commercial operation. In this report, first the outline of No. 2 unit facility and the quality control in the construction processes are described sequentially. For the comprehensive quality control activity over a series of plant design, manufacturing, installation and commissioning processes, the quality control policy was fixed, the system was established, the plan was prepared, and the quality control was promoted as planned and systematically. The outline of the quality control in each stage is described as follows. Design stage: It was implemented for the confirmation of applicable standards and references, the management of drawings submitted for approval, the selection of materials used, the coordination among sub-contractors, design change and the reflection of experience in preceding stations. Manufacturing stage. It was performed for material control, manufacturing management, factory test and control. Installation stage. It was practiced for the management of installation works, the inspection during the installation, and the check-up and control after the installation. Several quality control items were implemented also in the method of construction works and construction management. (Wakatsuki, Y.)

  16. Outline of principle of design construction of demolished concrete from electric power plant

    International Nuclear Information System (INIS)

    Takahashi, Tomohiko; Sakagami, Takeharu; Inagaki, Hirokazu; Morozumi, Hironori; Muranaka, Kenji

    2005-01-01

    'The principle of design construction of recycled demolished concrete from electric power plant' (a plan) is going to be published by TSCE Concrete Committee in 2005. The abstract of the above principle is described. A large amount of demolished concrete is generated by decommissioning of atomic power plant. About 450,000 to 500,000t of concrete with small radiation level per an atomic power plant will be generated. This report included decommissioning of Tokai power plant, characteristics of subject of demolished concrete, the recycled demolished concrete, fresh conditions of the recycled demolished concrete, the strength, deformation properties, durability, alkali silica reactivity of them and control measurement. (S.Y.)

  17. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  18. Construction of a 500 kV aerial power line in East Java

    Energy Technology Data Exchange (ETDEWEB)

    Kaeufl, O; Paschen, R; Kummermehr, R

    1987-10-12

    The authors report on the technical preparations and the construction of a 500 kv, four-bundle power line with a pylon tonnage of approximately 10,000 t of steel and a route length of 251 km in Indonesia. Due to the difficult terrain conditions, the sensitive infrastructure and the extremely short construction period, this project was a special technological challenge. Initially, the authors explain the technical planning of Brown Boveri with emphasis on foundations and assembly. As part of this tailor-made concept new technological solutions were used. They were instrumental in the successful completion of the project in only 19 months by the end of 1986 to the complete satisfaction of the customer. The authors also comment on the pracitcal experiences gained during the construction.

  19. A Continuing Education Short Course and Engineering Curriculum to Accelerate Workforce Development in Wind Power Plant Design, Construction, and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Tinjum, James [Univ. of Wisconsin, Madison, WI (United States)

    2012-11-29

    Significant advances in wind turbine technology and wind turbine power plant capabilities are appearing in the U.S. Sites that only 10 years ago might have been overlooked are being considered for build out. However, the development of a skilled workforce in the engineering fields and construction trades lags the potential market, especially if the industry is expected to site, design, construct, and operate sufficient wind power plant sites to meet the potential for 20% wind energy by 2030. A select few firms have penetrated the engineer-procure-construction (EPC) market of wind power plant construction. Competition and know-how in this market is vital to achieve cost-effective, design-construct solutions. The industry must produce or retrain engineers, contractors, and technicians to meet ambitious goals. Currently, few universities offer undergraduate or graduate classes that teach the basics in designing, building, and maintaining wind power plants that are safe, efficient, and productive.

  20. The importance of high vehicle power for passenger car emissions

    Science.gov (United States)

    Carslaw, David C.; Williams, Martin L.; Tate, James E.; Beevers, Sean D.

    2013-04-01

    In this paper we use a quantile regression technique to explore the emissions characteristics of petrol and diesel passenger cars to reveal the importance of high vehicle power on exhaust emissions. A large database of ≈67,000 passenger cars from vehicle emission remote sensing data was used from surveys from several campaigns around the UK. Most previous remote sensing studies have focused on presenting mean emission estimates by vehicle type over time. However, as shown in the current work, considerably more insight can be gained into vehicle emission characteristics if techniques are used that can describe and model the full distribution of vehicle emissions as a function of important explanatory variables. For post-2000 model year (Euro 3-5) diesel cars it is shown that there is a strong dependence of vehicle specific power for emissions of NOx that was absent in earlier models and is absent for other pollutants such as CO, hydrocarbons and 'smoke'. Furthermore, we also find a stronger dependence on vehicle specific power for older catalyst-equipped petrol vehicles (Euro 1/2) on emissions of NOx that is less important for other emissions such as CO and hydrocarbons. Moreover, it is shown that while the rated maximum power output of petrol cars has remained almost constant over the past 15-20 years, the power output from diesel cars has increased markedly by about 50%. These results suggest that changes to vehicle technology, driving conditions and driver behaviour have become more important determinants of passenger car NOx emissions in recent years and may help explain why urban ambient concentrations of NOx have not decreased as much as anticipated.

  1. Brokdorf nuclear power station: Construction scheduling and deadline control

    International Nuclear Information System (INIS)

    Lembcke, U.D.F.

    1986-01-01

    Scheduling, especially deadline control, for all installations of the Brokdorf nuclear power station was carried out centrally by the Project Management of Kraftwerk Union AG. 130 timetables encompassing some 13,000 activities were handled, which were interconnected and linked to 189 timetables (approx. 18,000 activities) from various specialized sections by means of data processing systems. Much space in time scheduling was taken by controls of software processing, especially of the preliminary inspection documents in the piping sector and of working documents for construction management in the control systems area. (orig.) [de

  2. Inspection of nuclear power plants under construction in Spain

    International Nuclear Information System (INIS)

    Santoma, L.

    1977-01-01

    Brief summary of the situation of the nuclear industry in Spain, in order to better understand the questions involved in the inspection of the Spanish nuclear power plants, as well as the experience acquired, followed by a description of some of the problems which have arisen during the construction phase. Also the problems faced by the Inspection of the Junta de Energia Nuclear are described in order to fulfill the missions entrusted to it. Finally, some recommendations are made in light of the experience had by Spain.(author) [es

  3. Modelling, Simulation and Construction of a DC/DC Boost Power Converter: A School Experimental System

    Science.gov (United States)

    Silva-Ortigoza, R.; Silva-Ortigoza, G.; Hernandez-Guzman, V. M.; Saldana-Gonzalez, G.; Marcelino-Aranda, M.; Marciano-Melchor, M.

    2012-01-01

    We introduce a dc/dc boost power converter as a didactic prototype intended to support courses on electric circuit analysis experimentally. The corresponding mathematical model is obtained, the converter is designed and an experimental setup is described, constructed and tested. Simplicity of construction as well as low cost of components renders…

  4. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  5. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  6. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume I

    International Nuclear Information System (INIS)

    1985-01-01

    This Record of Decision (ROD) sets forth the Bonneville Power Administration's (BPA) reasons for settling litigation over the delay in constructing Washington Public Power Supply System (Supply System) Nuclear Project No. 3 (WNP-3). The litigation concerns the decision in May 1983 to defer construction until financing becomes available to the Supply System and a demonstrable need for the Project is established. The construction deferral was made at the request of the Administrator of BPA, a federal power marketing agency in the Pacific Northwest. BPA is obligated to pay principal and interest on bonds sold by the Supply System to finance 70 percent of the project. The construction delay was opposed by the project's minority owners, four Northwest investor-owned utilities (companies) which collectively own 30 percent of the project

  7. The power paradox : Implicit and explicit power motives, and the importance attached to prosocial organizational goals in SMEs

    NARCIS (Netherlands)

    Hermans, Julie; Slabbinck, Hendrik; Vanderstraeten, Johanna; Brassey, Jacqueline; Dejardin, Marcus; Ramdani, Dendi; van Witteloostuijn, Arjen

    2017-01-01

    We examine the fundamental tension between explicit and implicit power motives; and their combined impact on the importance attached to prosocial organizational goals in small businesses (SMEs). We show that key decision-makers with a dominant implicit power motive attach more importance to the

  8. Assessing the effect of nuclear power installation construction and operation on the socio-economic sphere

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    A demographic analysis is made of the area within 25 km from the Dukovany nuclear power plant. The problem is discussed of sources and requirements for manpower for the construction and operation of the power plant. It was found that the capacity of creches and nursery schools for children of power plant employees is inadequate, as are health care facilities for personnel. (E.S.)

  9. INFLUENCE CONSTRUCTION OF THE ROLLER ON THE POWER OF THE DRIVE SYSTEM OF THE BELT CONVEYOR

    Directory of Open Access Journals (Sweden)

    Tadeusz OPASIAK

    2014-09-01

    Full Text Available The paper presents a study of new design of rollers. The study focused on the measurement of static and dynamic resistance of rotating rollers and the impact of new construction on the power consumption of the belt conveyor. Rollers have been modified through the use of class C4 bearing seals and labyrinth seal U4Exp 62/65 with a cover 2LU4 of runner construction. Measurements of static and dynamic resistance of rotating rollers were made on a universal rollers stand and power measurements were carried out on a belt conveyor power supply system Gwarek 1200 No. TW in mine KWK Mysłowice–Wesoła.

  10. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  11. Construction, start-up and operation of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Hornicek, Z.

    1989-01-01

    The Labor Safety Inspectorate have been supervising the construction of the Dukovany nuclear power plant since the construction start in 1977. It was found that in concreting the reactor building walls with concrete mixes, the regulations were not observed on the highest level for the concrete mix drop, and on the gap processing and concrete treatment when concreting was interrupted. Thus, concreting was halted until the conditions for concreting were met. Attention was focused on the protection of the hermetic casing from damage, which had very often happened. A number of shortcomings were detected in storing technology parts. The cleanliness was inspected of the facilities being assembled. The inspections also revealed shortcomings in sealed space tightness. The inspections of assembly and testing of facilities showed failures of the facilities themselves (control valves, electric motors, filter and pump sealing) and of the assembly process. Faults were also detected in electrical equipment. Only a very small part of the installation showed lifetime as specified by Decree 105/1982 Coll. laws on safety assurance in the nuclear power industry. Missing data in documentation led to delays in the start-up stages. The State Surveillance Body also inspected the results of equipment testing. Prior to physical start-up, all production facilities and buildings were inspected, labor safety was inspected for all personnel in communicating corridors, staircases, manholes and onservice and handling posts. Shortcomings were removed. The organization of assembly work was a considerable problem if staff from more organizations had to work together in the same workplace. A list of tasks is presented of State Surveillance Body in operation, maintenance, outages, repairs, and troubleshooting in a nuclear power plant. (J.B.)

  12. Purchasing management experience of Haiyang nuclear power project construction period

    International Nuclear Information System (INIS)

    Ma Yuqin

    2013-01-01

    Purchasing is one of the important aspects to ensure the safety and quality of the nuclear power plant. This paper, combining the purchasing peculiarity and purchasing process of Haiyang nuclear power project, summarizes experiences of Haiyang nuclear power project in promoting its purchasing management level in aspects of purchasing method choosing, purchasing plan management, purchasing process optimization, purchasing contract implementation and purchasing surveillance, etc. (author)

  13. A brief introduction on enterprise youth culture construction

    International Nuclear Information System (INIS)

    Yin Chunmei

    2010-01-01

    From the development tendency of modern enterprise in combination with practical experience, the paper discusses the importance of youth culture construction in modern enterprise and how to bring the Communist Youth League into full play i the enterprise youth culture construction and presents the initial in the enterprise youth culture construction by the Communist Youth League of Jiangsu Nuclear Power Corporation. (author)

  14. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  15. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  16. Modular construction of nuclear power plants in Korea and technical issues - 15051

    International Nuclear Information System (INIS)

    Kim, T.I.; Kim, K.K.; Yoon, J.J.; Han, G.E.

    2015-01-01

    The construction of nuclear power plants (NPPs) is the process of installing structures, systems and components (SCCs) of NPPs within a targeted time and a budget while ensuring quality and safety. Recently various efforts have been made in the nuclear industry to construct NPPs more effectively and modular construction has been highlighted as one of the most effective methods. Modular construction has been known to be effective in reducing construction time, allocating labor and equipment more efficiently while ensuring quality. The installation of structures and systems requires stable provision of labor force which is essential to keep the installation work of bulk materials such as re-bars, pipes and so forth in a construction site over a long period. Especially, in the case of the structure work, it is greatly affected by weather conditions such as rainfall, snow and wind, and discontinuity of installation work due to weather is directly related with success of a construction project. The most significant feature of modular construction is that SSCs could be pre-fabricated at an off-site factory or an assembly shop near a construction site, which provides stable labor force and favorable work condition impervious to weather. Reinforced concrete is largely used in NPPs and re-bar and form works are time consuming requiring lots of labor force at a construction site. Various efforts have been made to install re-bars and forms at the same time, which led to the development of SC structures. SC structures are composed of face steel plates which work as forms for concrete pouring as well as reinforcement for concrete. In this paper, we are going to introduce module types applicable to construction of NPPs and the status of modular construction in Korea. In addition, several issues will be addressed for the successful application of modular construction

  17. Construction and qualification of the Power Supply system of the AMS-02 Tracker detector

    International Nuclear Information System (INIS)

    Menichelli, M.; Accardo, L.; Ambrosi, G.; Battiston, R.; Bizzarri, M.; Blasko, S.; Cosson, D.; Fiori, E.M.; Maris, O.; Papi, A.; Scolieri, G.

    2007-01-01

    The AMS-02 Tracker power supply system, described in this paper, has been designed optimizing noise performances, modularity and efficiency. The power is distributed starting from a 28V line coming from the power distribution system is converted into the needed voltages by means of DC-DC converters, and for bias supply and front-end voltages is post-regulated by means of linear regulators. Components Off The Shelf (COTS) have been extensively used in the construction of this power supply, however various radiation test campaigns have been performed in order to verify the reliability of these components. The power supply architecture developed for the tracker detector has been used as a guideline for the development of the power supplies for the other detectors in the experiment

  18. Introduction of characteristics and construction methods for Lungmen NPP

    International Nuclear Information System (INIS)

    Hur, Kyung Phil; Manager, General

    2007-01-01

    Daewoo Engineering and Construction Co., Ltd. has taken part in the construction of ABWR (Advance Boiling Water Reactor of capacity of 1,350MW) at Lungmen site in Taiwan since 1999 as a member of Joint Company for the Nuclear Island Civil Work and Nuclear Island Equipment and Piping Work. This paper discusses the introduction of NSSS of ABWR and the major construction methods applied to Lungmen Nuclear Power Plants. Even though there is no BWR or ABWR type of Nuclear Power Plants built in Korea, the information and data related to the newly advanced construction technologies which has been already applied successfully is very important for the future overseas expansion

  19. Problems of economic assessment of social impacts of construction anO operation of nuctear power plant in the area

    International Nuclear Information System (INIS)

    Koudelka, F.

    1984-01-01

    The impacts of nuclear power plant construction and operation are divided into economic, demographic, on town planning, historic, etc. Further subdivision is performed according to the intensity of construction impacts, to the sequence and quality of impact and to the effects in space and time. The area of environmental impacts is classified into the protective area and the areas of immediate, limited and broad impact. The methods of the evaluation of nuclear power plant construction and operation impacts are discussed. (E.S.)

  20. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  1. Concrete containments in Swedish nuclear power plants. A review of construction and material

    International Nuclear Information System (INIS)

    Roth, Thomas; Silfwerbrand, Johan; Sundquist, Haakan

    2002-12-01

    The purpose of project is the long-term accumulation of knowledge related to the status of existing structures in order to facilitate answers to questions that may arise in the future. We have visited all the power stations in Sweden and in conjunction with these visits we have gone through all the relevant documents relating to the constructional concrete. An assessment of the structural integrity, related to the question of cracking and hence seepage, has been conducted. Currently, the work has only been done on a random sampling basis as in many cases important information is still missing. Generally, it can be said that the relevant constructions are, from a structural integrity point-of-view, correctly designed and detailed and have very high safety margins for the load cases which constitute the functional demands placed upon the installation. Each containment structure (vessel) appears to have been designed and built using the best available knowledge at the time of construction. It may be of interest to note that when these structures were built there was a very high level of competence and experience of how to design, detail, and construct large concrete structures. The cement used for the majority of these large concrete structures forming nuclear power stations, namely a slowly hardening cement (LH cement), had very good properties, perhaps even better than those available today. Later structures were built with other cements and concrete mixes, although this has been partly compensated for by a choice of a higher nominal quality. The environment is favourable regarding potential degradation of the concrete, the reinforcement steel and the steel liner. Questions remain regarding the uncertainties of the methods used for continuous inspection of the cement injected prestressing steel. This is even the case for possibly insufficient injection around grouting mounting parts for manholes and other openings. Assessment of prestressing losses may also require

  2. Construction of a dynamic model for a PEM power module with applications to distributed power generation. Paper no. IGEC-1-086

    International Nuclear Information System (INIS)

    Zhang, Z.; Jiang, J.; Wu, B.

    2005-01-01

    This paper deals with dynamic model construction for a PEM fuel cell power module with potential applications for distributed power generation. In particular, the effects of temperature and variations in the internal impedance as load changes have been considered. Analytical models are synthesized first by using the measurements taken at different operating conditions, and then these models are validated by performing static as well as dynamic tests on the fuel cells. The results have indicated that the models indeed represent the dynamic behaviour of the fuel cell power module accurately. (author)

  3. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  4. Constructing and Contesting City of London Power

    DEFF Research Database (Denmark)

    Baker, Andrew; Wigan, Duncan

    2017-01-01

    Existing literature on the City of London has tended to focus on its ‘structural power’, while neglecting political and narrative agency. This paper acts as a corrective by presenting evidence to show that since the financial crash of 2008 the political terrain the City operates on has become more...... contested, crowded and noisier. The contribution develops a middle course between a positive assessment of the role of civil society in relation to global finance, and a more pessimistic reading. We demonstrate how macro-narratives and public story-telling both construct and contest City and financial...... sector power. In a new pattern since the financial crash, NGOs have moved from campaigns of limited duration and narrow focus, to a more sustained presence on macro-structural issues. Adopting a supply–demand framework for assessing governance and regulatory change, we look at the emergence of TheCity...

  5. Modelling, simulation and construction of a dc/dc boost power converter: a school experimental system

    International Nuclear Information System (INIS)

    Silva-Ortigoza, R; Marciano-Melchor, M; Silva-Ortigoza, G; Hernández-Guzmán, V M; Saldaña-González, G; Marcelino-Aranda, M

    2012-01-01

    We introduce a dc/dc boost power converter as a didactic prototype intended to support courses on electric circuit analysis experimentally. The corresponding mathematical model is obtained, the converter is designed and an experimental setup is described, constructed and tested. Simplicity of construction as well as low cost of components renders the feasible introduction of this equipment in undergraduate laboratories. (paper)

  6. Construction of a self-powered neutron detector prototype

    International Nuclear Information System (INIS)

    Pombo, J.B.S.M.; Correa, R.F.

    1986-01-01

    Description and testing of a self-powered neutron detector and related current measurement electronics, in construction at Centro de Desenvolviemnto da Tecnologia Nuclear (CDTN), are presented. The cylindrical detector has a 9-wires cobalt emitter, Inconel 600 tubing collector and sinterized alumina electrical insulation. The bifilar signal cable is plugged to the detector through a SHV connector. Preliminary testing has giving information about dielectrical properties of the set and impurities of the materials (by means of activation analysis). The main tests, done in a 100 KW Triga Reactor, allowed the verification of the detector response to the neutron flux, the stability and reproducibility of this response, and also the evaluation of sensitivity to gamma radiation. The detector performance is considered good. (Author) [pt

  7. The use of fly ash the thermal power plants in the construction

    Science.gov (United States)

    Fediuk, R. S.; Yushin, A. M.

    2015-10-01

    The problems of ecological and radiation safety of the construction of man-made waste like fly ash thermal power plants were researched. The chemical composition of TPPs ashes of Primorsky Territory was studied, defined their specific effective activity of natural radionuclides. The most modern research methods were used - differential thermal analysis, thermogravimetry, X-ray analysis. It was revealed that the ash of the Primorskaya TPP and Partizanskaya TPP has exceed the permissible parameters of radioactivity, so not suitable for use in construction. Ashes of Vladivostok TPP-2 and Artem TPP of Primorsky Region on parameters radioactivity and chemical composition have suitable for use as a filler in the concrete.

  8. Nuclear power plants. Construction status report, data as of June 30, 1977. Data for decisions

    International Nuclear Information System (INIS)

    1977-07-01

    The report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 92 plants authorized to engage in construction activities is summarized. This total includes 4 plants with construction exemptions, and 18 plants with Limited Work Authorization Permits

  9. Nuclear power: status and outlook

    International Nuclear Information System (INIS)

    Rogner, H.H.; Langlois, L.M.; McDonald, A.

    2002-01-01

    Current state of the world nuclear energetics is reviewed; data on operating and nuclear power blocks under construction in different countries, data on electric power output, practice of operation are presented. New plans of energetic reactors, capitalized costs for their construction, operating cost and period of construction are treated. Problems of nuclear safety, spent fuel and radioactive waste management, non-proliferation policy are discussed. Outlook for the development of the nuclear energetics is directed and importance of the Bonn agreement in connection with economic reasons for NPP operation is noted [ru

  10. The importance of cleanliness in a proper construction site management in malaysia: a contractor’s perspective

    Science.gov (United States)

    Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.

    2017-11-01

    Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.

  11. Quality assurance of civil works during the construction of a nuclear power plant in Germany, F.R

    International Nuclear Information System (INIS)

    Hillemeier, B.

    1980-01-01

    During the construction of Nuclear Power Plants in Germany extended system-oriented steps will have to be mentioned, which the 'Kerntechnischer Ausschuss' has gathered up in his KTA-rules. The lecture outlines the organization and the performance of QA-requirements which are the common and lawful basis for the construction in Germany. The organizational structure and the functional responsability assignments at HOCHTIEF, one of the leading European contractors, will be represented. At last the QA-procedures will be described for a Nuclear Power Plant under erection. (orig.)

  12. Normative Power Europe and the Importance of the Discursive Context

    DEFF Research Database (Denmark)

    Larsen, Henrik

    2014-01-01

    Europe, with the notable exceptions of Diez (2013); Keene (2012); Forsberg (2011) and Huelss (2011) (who also discuss the meaning of the ‘normative’). Focusing on power, the question asked in this article is how the discursive context of the politics of religion affects the EU’s ability to exert......This article attempts to demonstrate the importance of the discursive context for whether and, if so, how the European Union (EU) can exert normative power in different policy areas. Surprisingly, the concept of power has not been extensively discussed in the academic literature on Normative Power...... normative power in this area. The article examines the politics of religion by looking at the case of the debate about human rights versus religion in the United Nations Human Rights Council after the year 2000. The broader point addressed in the article is whether the EU can exert normative power...

  13. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a

  14. Augmented reality for improved communication of construction and maintenance plans in nuclear power plants

    International Nuclear Information System (INIS)

    Sorensen, Soren S.

    2010-01-01

    The purpose of implementing Augmented Reality, AR, in the planning, construction and maintenance of Nuclear Power Plants is to secure strict control, precise and correct constructions, exact execution of assignments and heightened safety at all levels. Communication of construction plans to ensure precise and correct assembly of structural elements is essential in all building projects. This is especially crucial in the construction of nuclear plants and installation of new components. The current ways in which construction plans are communicated, blueprints, 3D digital models and written descriptions all embody the need for significant levels of abstraction and interpretation, and are thus both difficult to understand and can lead to misinterpretations. A simulation system with full scale three dimensional models experienced in the physical setting where operations are to take place would bring operators closer to the real life assignments. Augmented Reality is a visualization technology that provides this motivation. (author)

  15. Design, construction, and measurement of a large solar powered thermoacoustic cooler

    Science.gov (United States)

    Chen, Reh-Lin

    2001-07-01

    A device based on harnessing concentrated solar power in combination with using thermoacoustic principles has been built, instrumented, and tested. Its acoustic power is generated by solar radiation and is subsequently used to pump heat from external loads. The direct conversion between thermal and mechanical energy without going through any electronic stage makes the mechanism simple. Construction of the solar collector is also rather unsophisticated. It was converted from a 10-ft satellite dish with aluminized Mylar glued on the surface. The thermoacoustic device was mounted on the dish with its engine's hot side positioned near the focus of the parabolic dish, about 1 meter above the center of the dish. A 2-dimensional solar tracking system was built, using two servo motors to position the dish at pre-calculated coordinates. The solar powered thermoacoustic cooler is intended to be used where solar power is abundant and electricity may not be available or reliable. The cooler provides cooling during solar availability. Cooling can be maintained by the latent heat of ice when solar power is unattainable. The device has achieved cooling although compromised by gas leakage and thermal losses and was not able to provide temperatures low enough to freeze water. Improvements of the device are expected through modifications suggested herein.

  16. ABWR construction experience in Japan

    International Nuclear Information System (INIS)

    Kawahata, Junichi; Miura, Jun; Saito, Fuyuki; Mori, Hiroya

    2003-01-01

    The construction of Kashiwazaki-Kariwa Nuclear Power Station Unit No. 6 and 7 (K6 and 7) owned by Tokyo Electric Power Company (TEPCO), have been in service since November 1996 and September 1997 respectively, and are the first ABWRs in the world. Hitachi, Ltd. and Toshiba Corporation took part in the projects and achieved safety construction in 52- month schedule from rock inspection to turnover in cooperation with TEPCO and other contractors with broad experience in BWRs. Taking advantage of experience of the Kashiwazaki construction, the ABWR construction methods realize to satisfy with requests from electric power companies and to fit site conditions. The Chubu Electric Power Company's Hamaoka Nuclear Power Station Unit No. 5 (Hamaoka 5) and Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2), which are ABWRs, completed rock inspection in May 2000 and June 2001 respectively, and are under construction. The ABWR construction methods are proved their validity through four actual construction projects. Safe constructions with the highest quality have been advanced thus further aiming at the introduction of the latest technologies and contributing to reduce plant construction costs and also to shorten schedule. (author)

  17. Constructions of power in the documentary film Maradona, by Emir Kusturica

    Directory of Open Access Journals (Sweden)

    Ana Maria Acker

    2012-11-01

    Full Text Available The article analyzes how the filmmaker Emir Kusturica composes the main character in the documentary Maradona, (2008. The constructions of power around the figure of the player are verified, especially by the authors Pierre Bourdieu, Max Weber and Erving Goffman. The purpose of this paper is to try to understand how the Serbian director explains the Argentine phenomenon in football through out the documentary narrative.

  18. Restoration and construction (buildings). Solar electric power. How to complete a photovoltaic project

    International Nuclear Information System (INIS)

    Bareau, Helene; Juniere, Olivier

    2017-10-01

    This brochure, edited by ADEME, the French office for energy management and sustainable development, gives a basic but comprehensive outlook on the way to complete a solar photovoltaic project in the cases of the restoration or the construction of a building. After a presentation of solar energy, its transformation into electric power, and the installation of solar photovoltaic panels and equipment, the brochure exposes the various steps of a photovoltaic project: economic analysis (cost estimation, budgets, financing incentives, power prices, the choice between selling or using electric power, the contracts, etc.), the planning of the project, the administrative procedure, the selection of a professional installer, how to run the photovoltaic system, how to run the business, etc

  19. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  20. Power plant construction contracting in a changing regulatory environment

    International Nuclear Information System (INIS)

    Person, J.C.

    1993-01-01

    The 1965 blackout in the Northeast provided the wake-up call that spawned in unprecedented program of power plant construction by electric utilities. This building program began in the late 1960s and continued unabated through the 1970s. Beginning in the late 1970s, state regulators began in era of 'prudence' reviews which disallowed as imprudent significant portions of the costs of certain nuclear units being brought on line at the time. This regulatory experience brought about a fundamental change in the way in which utilities evaluated the need for additional capacity. This paper explores construction contracting trends in light of recent developments in the relationship between the electric utility and the state regulator. It is within this context that the utility decides: (1) whether to build, buy, or save; and (2) if the decision is to build, which project planning and administration considerations will maximize the utility's ability to incorporate project costs into the ratebase. In order to put these issues into their proper perspective, this paper first presents a brief overview of the prudence decisions of the past, and the chilling effect of these decisions generally on new project planning. The paper next focuses on the recent changes to the post-construction prudence review model, including the introduction of pre-approval arrangements and rolling prudence reviews. Following that will be a survey of new construction spending decisions in light of these changes. After an analysis of the bases for the prudence disallowances of the past and the application of the lessons learned from these disallowances to contract planning and administration issues of today, the paper will close with a discussion of the relative advantages and disadvantages of the most commonly used contract delivery methods in today's regulatory environment

  1. Power engineering constructions

    International Nuclear Information System (INIS)

    Chalus, Z.; Misterka, V.; Horak, P.

    1991-01-01

    Methods and applications of the design procedure, looked upon as a manifestation of management skills, are described on examples of the Finnish and French state power companies IVO and EdF, respectively. For understanding the activities at IVO, facts concerning the development of the organization structure of this joint-stock company and its rules as well as basic data of the Finnish power industry are given. The IVOSTUDY program package used for decision-making in the field of capital investments is described, as are the information systems employed by the managements of IVO and EdF. The management program systems ARTEMIS, BASIS, AFORA PMS and APROS are also discussed and experience from their use by the two companies is summarized. (J.P.)

  2. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  3. Preparation and practice for nuclear power plant operation

    International Nuclear Information System (INIS)

    Wu Xuesong; Lu Tiezhong

    2015-01-01

    The operational preparation of the nuclear power plant is an important work in nuclear power plant production preparation. Due to the construction period of nuclear power plant from starting construction to production is as long as five years, the professional requirements of nuclear power operation are very strict, and the requirements for nuclear safety are also extremely high. Especially after the Fukushima accident, higher requirements for the safe operation of nuclear power plant are posed by competent authorities of the national level, regulatory authorities and each nuclear power groups. Based on the characteristics of the construction phase of nuclear power plant and in combination with engineering practice, this paper expounds the system established in the field of nuclear power plant operation and generally analyses the related management innovation. (authors)

  4. The effectiveness of new austrian tunnelling method (NATM for hydro power plant construction: lau gunung power plant, north sumatera, indonesia

    Directory of Open Access Journals (Sweden)

    Ade Khoir Rizki

    2017-01-01

    Full Text Available Hydro Electric Power Plant is a power generating system using gravity fall of water as the main force to move the turbine and generate electricity. The construction purpose of Lau Gunung hydropower (2×7. 5 MW that is located in Dairi, North Sumatra, is to Supply power to 14,000 house of the surrounding region. The river run-off system, where the water is immediately contained and then flowed through a tunnel considering the discharge flowing river, where it is constant and does not occur in the fluctuating water level. The Lau Gunung river has the minimum flow that can exceed from 15 to 25 m3/s with a high tunnel dimensions of 4 metres long, 3,9 metres wide and a length of 1,6 kilometres. In terms of the analysis of the time effectiveness of the NATM can be saved because of the continuous work of 24 hours, without any obstacles in which the sub methods used include the drilling & blasting. The tunnel then use the form of steel reinforcement rib and Safety shotcrete lining. The general review may show that using NATM result a tremendous savings, also the use of horse shape conduce small displacement which is effective for the construction.

  5. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  6. The Power Paradox: Implicit and Explicit Power Motives, and the Importance Attached to Prosocial Organizational Goals in SMEs

    Directory of Open Access Journals (Sweden)

    Julie Hermans

    2017-11-01

    Full Text Available We examine the fundamental tension between explicit and implicit power motives; and their combined impact on the importance attached to prosocial organizational goals in small businesses (SMEs. We show that key decision-makers with a dominant implicit power motive attach more importance to the prosocial goals of job creation and taking care of the environment in their businesses. However, we reveal that this positive relationship is moderated by their explicit power motive. Once decision-makers in SMEs consciously seek for power, the positive relationship is neutralized. With these results, we highlight the conceptual and methodological differences between implicit and explicit power motives. We could obtain these results because we developed and validated an innovative implicit motive measure—the Shortened Pictorial Attitude Implicit Association Test (SPA-IAT. Contrary to the currently available implicit motive measures, the SPA-IAT is fast and easy to use and analyze, which makes this novel instrument well suited for research in business settings.

  7. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  8. Software important to safety in nuclear power plants

    International Nuclear Information System (INIS)

    1994-01-01

    The report provides guidance on current practices, documenting their strengths and weaknesses for dealing with the important issues of software engineering that nuclear power plant system designers, software producers and regulators are facing. The focus of the report is on safety critical applications of general purpose processors controlled by custom developed software; however, it should also have application in safety related applications and for other types of computers. In addition to system designers, software producers and regulators, the intended readership of this report includes users of software based systems, who should be aware of the relevant issues in specifying and obtaining software for systems important to safety. Refs, 1 fig., tabs

  9. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  10. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    International Nuclear Information System (INIS)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin

    2015-01-01

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization

  11. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization.

  12. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  13. Power station and environment - practical common sense policy

    International Nuclear Information System (INIS)

    Lenz, S.

    1977-01-01

    During the years of reconstruction, decisions made by the democratically elected and assigned authorities were accepted in the Federal Republic of Germany. This is not the case any more since approximately 1969. Initiatives of citizens act as protesting organisations against the construction of power plants, especially they are against the construction and operation of nuclear power plants. Initiatives of citizens are not allowed to act against the law. Usurpation of power will place the citizens actions into illegality. In an increasing measure, the responsibility is pushed from the executive to the judiciary, which is not in a position to represent the parliaments in regard to taking over the responsibility in the technical-scientifical range. There is no life without risk. However, if the risk of nuclear power plants is a lot smaller than the normal risk of life, it is 'practically zero' and the construction of nuclear power plants is practically sensible. We cannot renounce growth, as zero growth does not solve environmental problems, or the worldwide decrease of income. At growth, not only the subject-intensive growth is of importance. Of much more importance is spiritual growth. In important existential questions concerning our citizens, it is necessary that all state supporting power solve the problems with common sense, and that they lead to constructive solutions. Citizens, politicians, technicians and engineers shall therefore cooperate in keeping our state in order, and in the work in regard to a energy safe future. (orig.) [de

  14. Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'

    International Nuclear Information System (INIS)

    Emori, Kengo

    1979-01-01

    The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)

  15. Nuclear power plants: data for decisions. Construction status report: data as of July 31, 1977

    International Nuclear Information System (INIS)

    1977-08-01

    This management report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 91 plants authorized to engage in construction activities in Regions I thru V is summarized in this document. This total includes (4) plants with construction exemptions, and (10) plants with Limited Work Authorization Permits

  16. Social and legal aspects of preparing the construction and operation of a nuclear power source

    International Nuclear Information System (INIS)

    Curin, K.

    1989-01-01

    The main activities are described involved in creating territorial, technical and economic conditions for the building of nuclear power plants. The basic precondition is the prognostic evaluation of national requirements for power in each planning time stage. From this proceeds the need of a range of power sources with a definition of their types and their incorporation in the power system and of possible power supply to the district heating system. As for nuclear power plants the building should be divided into three stages: from planning investments to the issuance of an investment intent, the stage of construction and that of operation. A detailed description is presented of the activities of all participants in building nuclear power plants in Czechoslovak conditions. Attention is devoted to the aspects of reliability and safety of nuclear power plants and to the effect of the respective activities on reliability and safety. (Z.M.). 1 tab

  17. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  18. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  19. Information resources for nuclear power construction

    International Nuclear Information System (INIS)

    Rozin, V.M.

    1987-01-01

    Problems of designing and introduction of data resources (in the form of magnetic carrier data) for the construction of NPP with the WWER-1000 type reactors are considered. It is suggested that the data resources should be supplied to the construction as independent production alongside with preliminary estimation and material resources. It is pointed out that the introduction of the data resource will permit to increase the efficiency of NPP construction management

  20. Concrete for the construction of No. 1 nuclear power generator of Tokyo Denryoku Co.'s Kashiwazaki, Kariha nuclear power station

    International Nuclear Information System (INIS)

    Suzuki, Yasuyoshi; Eguchi, Kiyoshi; Nakakomi, Akira.

    1985-01-01

    The construction of the No.1 power generator of Kariha nuclear power generator was completed on March 1985, and the installations of equipments are on their way aiming the start in October 1960. About 900,000 m 3 of concrete was produced and used for whole work and about 500,000 m 3 out of total was used for the construction of plant building. For constructing reactor building and turbin building, the concrete must have shielding property against radiation. The specific gravity no less than 2.5 was required for dry state of laid concrete. In order to supply very large amount of concrete with stable quality, preliminary investigation on raw materials including aggregates, fly-ash and surface active agents, were made. Aggregates were stored in underground bins to keep the temperature constant for the purpose of obtaining mixed concrete with constant temperature. For determining the mixing rate of concrete, physical test such as slump test, determination of air content, determinations of strengths and specific gravities of solidified concrete. Quality control committee was established to observe the optimum condition, which were confirmed by preliminary tests, of concrete preparation. As the results of detailed preliminary investigation on respective raw material and strict quality control from the source of raw material to mixed concrete, the supply of concrete with stable quality which conforms every requirement of standard, was possible. (Ishimitsu, A.)

  1. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  2. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  3. Seismic design for Monju FBR power plant

    International Nuclear Information System (INIS)

    1982-01-01

    This technical report introduces the basic concept on the aseismatic design of the FBR ''Monju'' power station, of which the construction in Tsuruga is planned by the Power Reactor and Nuclear Fuel Development Corp. The safety design of Monju has been performed according to ''The concept of evaluating the safety of fast breeder reactors'', and the thought concerning the aseismatic design also is written in it. According to it, ''The guide for the examination of aseismatic design regarding power reactor facilities'' should be referred to, and the classification according to the importance in aseismatic design must be made, taking the features in the design of liquid metal-cooled FBRs fully in consideration. In the aseismatic design of Monju performed according to these basic concept, the following two points were examined. In the aseismatic design of the equipment and piping, the difference of construction from LWRs such as low pressure, thin walled and high temperature construction is taken in consideration. The classification according to the aseismatic importance of the system and equipment is made on the basis of the features in the design of Monju. The classification according to aseismatic importance, the method of calculating earthquake power, the combination of loads and the allowable limit, and the aseismatic construction of the main facilities are reported. (Kako, I.)

  4. Application of quasi-optical approach to construct RF power supply for TeV linear colliders

    International Nuclear Information System (INIS)

    Saldin, E.L.; Sarantsev, V.P.; Schneidmiller, E.A.; Ulyanov, Yu.N.; Yurkov, M.V.

    1995-01-01

    An idea to use a quasi-optical approach for constructing an RF power supply for TeV linear e + e - colliders is developed. The RF source of the proposed scheme is composed of a large number of low-power RF amplifiers commutated by quasi-optical elements. The RF power of this source is transmitted to the accelerating structure of the collider by means of quasi-optical waveguides and mirrors. Such an approach enables one not only to decrease the required peak RF power by several orders of magnitude with respect to the traditional approach based on standard klystron technique, but also to achieve the required level of reliability, as it is based on well-developed technology of serial microwave devices. To illustrate the proposed scheme, a conceptual project of 2x500 GeV X-band collider is considered. Accelerating structure of the collider is of the standard travelling wave type and the RF source is assumed to be composed of 0.7 MW klystrons. All equipment of such a collider is placed in a tunnel of 12x6 m 2 cross section. It is shown that such a collider may be constructed at the present level of accelerator technique. ((orig.))

  5. Application of large-scaled pre-cast components for the construction of water intake for a nuclear power plant

    International Nuclear Information System (INIS)

    Topolnicki, M.

    1976-01-01

    Problem of the construction of water intake for a 4000 MW nuclear power plant located at the seashore is solved. The advantages of application of large-size pre-cast components are presented,. The constructional solutions and proposed technologies are described in detail. (A.S.)

  6. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  7. Instrumentation and control systems important to safety in nuclear power plants. Safety guide

    International Nuclear Information System (INIS)

    2005-01-01

    This Safety Guide was prepared under the IAEA programme for establishing safety standards for nuclear power plants. It supplements Safety Standards Series No. NS-R-1: Safety of Nuclear Power Plants: Design (the Requirements for Design), which establishes the design requirements for ensuring the safety of nuclear power plants. This Safety Guide describes how the requirements should be met for instrumentation and control (I and C) systems important to safety. This publication is a revision and combination of two previous Safety Guides: Safety Series Nos 50-SG-D3 and 50-SG-D8, which are superseded by this new Safety Guide. The revision takes account of developments in I and C systems important to safety since the earlier Safety Guides were published in 1980 and 1984, respectively. The objective of this Safety Guide is to provide guidance on the design of I and C systems important to safety in nuclear power plants, including all I and C components, from the sensors allocated to the mechanical systems to the actuated equipment, operator interfaces and auxiliary equipment. This Safety Guide deals mainly with design requirements for those I and C systems that are important to safety. It expands on paragraphs of Ref in the area of I and C systems important to safety. This publication is intended for use primarily by designers of nuclear power plants and also by owners and/or operators and regulators of nuclear power plants. This Safety Guide provides general guidance on I and C systems important to safety which is broadly applicable to many nuclear power plants. More detailed requirements and limitations for safe operation specific to a particular plant type should be established as part of the design process. The present guidance is focused on the design principles for systems important to safety that warrant particular attention, and should be applied to both the design of new I and C systems and the modernization of existing systems. Guidance is provided on how design

  8. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  9. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  10. Materials-of-Construction Radiation Sensitivity for a Fission Surface Power Convertor

    Science.gov (United States)

    Bowman, Cheryl L.; Geng, Steven M.; Niedra, Janis M.; Sayir, Ali; Shin, Eugene E.; Sutter, James K.; Thieme, Lanny G.

    2007-01-01

    A fission reactor combined with a free-piston Stirling convertor is one of many credible approaches for producing electrical power in space applications. This study assumes dual-opposed free-piston Stirling engines/linear alternators that will operate nominally at 825 K hot-end and 425 K cold-end temperatures. The baseline design options, temperature profiles, and materials of construction discussed here are based on historical designs as well as modern convertors operating at lower power levels. This notional design indicates convertors primarily made of metallic components that experience minimal change in mechanical properties for fast neutron fluences less than 10(sup 20) neutrons per square centimeter. However, these radiation effects can impact the magnetic and electrical properties of metals at much lower fluences than are crucial for mechanical property integrity. Moreover, a variety of polymeric materials are also used in common free-piston Stirling designs for bonding, seals, lubrication, insulation and others. Polymers can be affected adversely by radiation doses as low as 10(sup 5) - 10(sup 10) rad. Additionally, the absorbing dose rate, radiation hardness, and the resulting effect (either hardening or softening) varies depending on the nature of the particular polymer. The classes of polymers currently used in convertor fabrication are discussed along possible substitution options. Thus, the materials of construction of prototypic Stirling convertor engines have been considered and the component materials susceptible to damage at the lowest neutron fluences have been identified.

  11. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    International Nuclear Information System (INIS)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung

    2014-01-01

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently

  12. Basic Study of Establishment of Quality Assurance Processes to Develop an Integrated Quality Assurance System for Nuclear Power Plant Construction

    Energy Technology Data Exchange (ETDEWEB)

    Lim, Byungki; Moon, Byeongsuk; Lee, Jae Kyoung [Korea Hydro and Nuclear Power Co. Ltd., Daejeon (Korea, Republic of)

    2014-05-15

    An integrated quality assurance system has necessitated carrying out quality assurance programs in a systematic manner because the opportunities to expand business in overseas markets have increased since the export of a nuclear power plant to UAE in 2009. In this study, we use PDCA method to systematically analyze the quality assurance procedures that were used in previous projects for constructing nuclear power plants. We reached a classification system of quality assurance processes at each phase of nuclear power plant construction by integrating similar work related to quality such as planning, design, equipment manufacturing, construction and start-up. We also established a hierarchy of quality assurance processes to develop an integrated quality assurance system as a technology goal to be developed later. To obtain most updated quality assurance activities, a quality assurance process is structured by integrating similar works analyzed from quality assurance procedures through PDCA cycle method. At the implementation phase of Hierarchy of quality processes and sequence of processes for constructing nuclear power plant are established in this study. Integrated quality assurance system is to be developed by connecting organizations as well as stakeholders such as owners, Architect engineering, suppliers, contractors, and sub-contractors to carry out assigned work efficiently.

  13. Fire protection programme during construction of the Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Mian Umer, M.

    1998-01-01

    A clear view is given of several measures that have been taken with regard to fire prevention, protection and fire fighting during all phases of the construction, installation and commissioning of the Chasma nuclear power plant to protect personnel and equipment so that any delays in plant operation as a result of fire incident can be avoided. These measures include the precautions taken, the provisions made for fire extinguishers and hydrants, and the setting up of a fire brigade. An overview is also given of the fire incidents that have occurred. (author)

  14. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  15. Lessons from American-German nuclear power plant construction. Quality, safety and costs of an attempt to integrate American and German nuclear power plant technology

    International Nuclear Information System (INIS)

    Buchwald, K.

    1979-05-01

    The 1300 MW nuclear power plant at Muelheim-Kaerlich has been under construction since the beginning of 1975. It is being equipped with a pressurised water reactor which has been adapted to the German client's requirements and German licensing practice, based on a license held by Babcock and Wilcox USA (B and W). The problems which have arisen in making this adaptation are the result of different requirements in the USA and the Federal Republic of Germany which make it very difficult to integrate the two technologies. Full integration will almost certainly be impossible, but integration to the widest possible extent is important because it might mean both greater safety and reduced costs. In this article it is intended to show where the problems of integration lie and how they might perhaps be overcome. (author)

  16. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  17. First Aspect of Conventional Power System Assessment for High Wind Power Plants Penetration

    Directory of Open Access Journals (Sweden)

    A Merzic

    2012-11-01

    Full Text Available Most power systems in underdeveloped and developing countries are based on conventional power plants, mainly "slow-response" thermal power plants and a certain number of hydro power plants; characterized by inflexible generating portfolios and traditionally designed to meet own electricity needs. Taking into account operational capabilities of conventional power systems, their development planning will face problems with integration of notable amounts of installed capacities in wind power plants (WPP. This is what highlights the purpose of this work and in that sense, here, possible variations of simulated output power from WPP in the 10 minute and hourly time interval, which need to be balanced, are investigated, presented and discussed. Comparative calculations for the amount of installed power in WPP that can be integrated into a certain power system, according to available secondary balancing power amounts, in case of concentrated and dispersed future WPP are given. The stated has been done using a part of the power system of Bosnia and Herzegovina. In the considered example, by planned geographically distributed WPP construction, even up to cca. 74% more in installed power of WPP can be integrated into the power system than in case of geographically concentrated WPP construction, for the same available amount of (secondary balancing power. These calculations have shown a significant benefit of planned, geographically distributed WPP construction, as an important recommendation for the development planning of conventional power systems, with limited balancing options. Keywords: balancing reserves,  geographical dispersion, output power  variations

  18. Improvement of system code importing evaluation of Life Cycle Analysis of tokamak fusion power reactors

    International Nuclear Information System (INIS)

    Kobori, Hikaru; Kasada, Ryuta; Hiwatari, Ryoji; Konishi, Satoshi

    2016-01-01

    Highlights: • We incorporated the Life Cycle Analysis (LCA) of tokamak type DEMO reactor and following commercial reactors as an extension of a system code. • We calculated CO_2 emissions from reactor construction, operation and decommissioning that is considered as a major environmental cost. • We found that the objective of conceptual design of the tokamak fusion power reactor is moved by changing evaluation index. • The tokamak fusion reactor can reduce CO_2 emissions in the life cycle effectively by reduction of the amount involved in the replacement of internal components. • The tokamak fusion reactor achieves under 0.174$/kWh electricity cost, the tokamak fusion reactor is contestable with 1500 degrees-class LNG-fired combined cycle power plant. - Abstract: This study incorporate the Life Cycle Analysis (LCA) of tokamak type DEMO reactor and following commercial reactors as an extension of a system code to calculate CO_2 emissions from reactor construction, operation and decommissioning that is considered as a major environmental cost. Competitiveness of tokamak fusion power reactors is expected to be evaluated by the cost and environmental impact represented by the CO_2 emissions, compared with present and future power generating systems such as fossil, nuclear and renewables. Result indicated that (1) The objective of conceptual design of the tokamak fusion power reactor is moved by changing evaluation index. (2) The tokamak fusion reactor can reduce CO_2 emissions in the life cycle effectively by reduction of the amount involved in the replacement of internal components. (3) The tokamak fusion reactor achieves under 0.174$/kWh electricity cost, the tokamak fusion reactor is contestable with 1500 degrees-class LNG-fired combined cycle power plant.

  19. Improvement of system code importing evaluation of Life Cycle Analysis of tokamak fusion power reactors

    Energy Technology Data Exchange (ETDEWEB)

    Kobori, Hikaru [Institute of Advanced Energy, Kyoto University, Gokasho, Uji, Kyoto 611-0011 (Japan); Kasada, Ryuta, E-mail: r-kasada@iae.kyoto-u.ac.jp [Institute of Advanced Energy, Kyoto University, Gokasho, Uji, Kyoto 611-0011 (Japan); Hiwatari, Ryoji [Central Research Institute of Electric Power Industry, Tokyo (Japan); Konishi, Satoshi [Institute of Advanced Energy, Kyoto University, Gokasho, Uji, Kyoto 611-0011 (Japan)

    2016-11-01

    Highlights: • We incorporated the Life Cycle Analysis (LCA) of tokamak type DEMO reactor and following commercial reactors as an extension of a system code. • We calculated CO{sub 2} emissions from reactor construction, operation and decommissioning that is considered as a major environmental cost. • We found that the objective of conceptual design of the tokamak fusion power reactor is moved by changing evaluation index. • The tokamak fusion reactor can reduce CO{sub 2} emissions in the life cycle effectively by reduction of the amount involved in the replacement of internal components. • The tokamak fusion reactor achieves under 0.174$/kWh electricity cost, the tokamak fusion reactor is contestable with 1500 degrees-class LNG-fired combined cycle power plant. - Abstract: This study incorporate the Life Cycle Analysis (LCA) of tokamak type DEMO reactor and following commercial reactors as an extension of a system code to calculate CO{sub 2} emissions from reactor construction, operation and decommissioning that is considered as a major environmental cost. Competitiveness of tokamak fusion power reactors is expected to be evaluated by the cost and environmental impact represented by the CO{sub 2} emissions, compared with present and future power generating systems such as fossil, nuclear and renewables. Result indicated that (1) The objective of conceptual design of the tokamak fusion power reactor is moved by changing evaluation index. (2) The tokamak fusion reactor can reduce CO{sub 2} emissions in the life cycle effectively by reduction of the amount involved in the replacement of internal components. (3) The tokamak fusion reactor achieves under 0.174$/kWh electricity cost, the tokamak fusion reactor is contestable with 1500 degrees-class LNG-fired combined cycle power plant.

  20. Summary of experience from a large number of construction inspections; Wind power plant projects; Erfarenhetsaaterfoering fraan entreprenadbesiktningar

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Bertil; Holmberg, Rikard

    2010-08-15

    This report presents a summary of experience from a large number of construction inspections of wind power projects. The working method is based on the collection of construction experience in form of questionnaires. The questionnaires were supplemented by a number of in-depth interviews to understand more in detail what is perceived to be a problem and if there were suggestions for improvements. The results in this report is based on inspection protocols from 174 wind turbines, which corresponds to about one-third of the power plants built in the time period. In total the questionnaires included 4683 inspection remarks as well as about one hundred free text comments. 52 of the 174 inspected power stations were rejected, corresponding to 30%. It has not been possible to identify any over represented type of remark as a main cause of rejection, but the rejection is usually based on a total number of remarks that is too large. The average number of remarks for a power plant is 27. Most power stations have between 20 and 35 remarks. The most common remarks concern shortcomings in marking and documentation. These are easily adjusted, and may be regarded as less serious. There are, however, a number of remarks which are recurrent and quite serious, mainly regarding gearbox, education and lightning protection. Usually these are also easily adjusted, but the consequences if not corrected can be very large. The consequences may be either shortened life of expensive components, e.g. oil problems in gear boxes, or increased probability of serious accidents, e.g. maladjusted lightning protection. In the report, comparison between power stations with various construction period, size, supplier, geography and topography is also presented. The general conclusion is that the differences are small. The results of the evaluation of questionnaires correspond well with the result of the in-depth interviews with clients. The problem that clients agreed upon as the greatest is the lack

  1. Flood control construction of Shidao Bay nuclear power plant and safety analysis for hypothetical accident of HTR-PM

    International Nuclear Information System (INIS)

    Chen Yongrong; Zhang Keke; Zhu Li

    2014-01-01

    A series of events triggered by tsunami eventually led to the Fukushima nuclear accident. For drawing lessons from the nuclear accident and applying to Shidao Bay nuclear power plant flood control construction, we compare with the state laws and regulations, and prove the design of Shidao Bay nuclear power plant flood construction. Through introducing the history of domestic tsunamis and the national researches before and after the Fukushima nuclear accident, we expound the tsunami hazards of Shidao Bay nuclear power plant. In addition, in order to verify the safety of HTR-PM, we anticipate the contingent accidents after ''superposition event of earthquake and extreme flood'', and analyse the abilities and measures of HTR-PM to deal with these beyond design basis accidents (BDBA). (author)

  2. Discussion of important safety requirements for new nuclear power plants

    International Nuclear Information System (INIS)

    Zhang Lin; Jia Xiang; Yan Tianwen; Li Wenhong; Li Chun

    2014-01-01

    This paper presents the analysis of several important safety requirements and improvement direction. Technical view of security goals on site safety evaluation, internal and external events fortification, serious accident prevention and mitigation, as well as the core, containment system and instrument control system design and engineering optimization, and etc are indicated. It will be useful for new plant design, construction and safety improvement. (authors)

  3. Supply chain of steel industries for the nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sahala M Lumbanraja

    2017-01-01

    Nuclear Power Plant (NPP) Construction needs steel materials for the manufacturing of heavy components and civil work construction. National industries is expected to supply steel components especially for non nuclear component needs. Supply chain of steel industries is required to know the potency of steel industries from upstream to downstream industries which can support the NPP construction sustainability. The type of steel needed in the NPP construction consist of structure steel, rebar, steel plate, etc. The aim of the study is to identify supply chain of steel industries from upstream industries to downstream industries so that they can supply steel needs in the NPP construction. The methodology used are literature review and industries survey by purposive sampling test which sent questionnaires and carrying out technical visits to the potential industries to supply steel components for NPP construction. From the analysis of the questionnaires and survey, it has been obtained that the Indonesian steel industries capable of supplying steel for construction materials of non-nuclear parts are PT. Krakatau Steel, PT. Gunung Steel Group (PT Gunung Garuda and PT. Gunung Raja Paksi), PT. Cilegon Fabricators and PT. Ometraco Arya Samanta. While steel materials for primary components with nuclear grade, such as steel materials for reactor vessels and pressure vessels, the Indonesian steel industry has not been able to supply them. Therefore, the Indonesian steel industries must improve its capability, both in raw material processing and fabrication capability in order to meet the requirements of specifications, codes and standards of nuclear grade. (author)

  4. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jae Wang; Yee, Eric

    2014-01-01

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  5. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Wang; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  6. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  7. Environmental aspects of nuclear power

    International Nuclear Information System (INIS)

    Ward, D.P.

    1987-01-01

    Nuclear power provides the world with an important option for generating electricity. To successfully and safely utilize this power, engineering and environmental factors should be carefully considered throughout a nuclear power plant project, especially during the planning stages. This paper discusses the major environmental aspects of a nuclear power plant project from site selection to retirement. During the site selection process, both engineering and environmental resources must be identified and evaluated. Environmental resources include areas that support agricultural or aquatic commercial activities, habitats for commercial or endangered species, population centers, transportation systems, and recreational areas. Also, during the site selection process, the potential impacts of both construction and operating activities must be considered. In addition to the area actually disturbed by construction, construction activities also affect local services, such as transportation systems, housing, school systems, and other social services. Since nuclear power plants use a 'clean fuel,' generally the most significant operating activity having a potential environmental impact is the discharge of cooling water. The potential effect of this discharge on commercial activities and sensitive habitats should be thoroughly evaluated. Lastly, the method of decommissioning can affect long-range land use planning and should therefore be considered during the planning process. With appropriate planning, nuclear power plants can be constructed and operated with minimum environmental impact. (author)

  8. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  9. Nuclear Power Plant Construction Contracts: A Review of the Major Problems

    International Nuclear Information System (INIS)

    Crawford, B.B.

    1977-01-01

    This paper analyses the problems raised by nuclear power plant construction contracts. To the extent these contracts can be defined as devices for allocating responsibilities and risks between the Contracting Parties, the author notes that the 'responsibilities' aspect presents no problem peculiar to the nuclear sector and that difficulties mainly stem from co-ordination of work. On the other hand, the list of problems linked to 'nuclear contract risks' is long: uncertainties in the licensing procedure and export licenses, changes in pricing due to inflation, imprevision and force majeure theories, protection of proprietary information, operator's civil liability for nuclear incidents. (NEA) [fr

  10. ABCDEFG IS - the principle of constructive feedback.

    Science.gov (United States)

    Bhattarai, M

    2007-01-01

    Feedback is an integral part of any learning experience. Constructive feedback is a powerful instrument and facilitates the learner's professional and personal development. "ABCDEFG IS", a mnemonic for the principles of constructive feedback, stands for Amount of the information, Benefit of the trainees, Change behaviour, Descriptive language, Environment, Focused, Group check, Interpretation check, and Sharing information. The eight important steps of feedback are: Ensure prior information, Collect data, Make appropriate meeting arrangement, Begin by encouraging self assessment by the trainee, Highlight areas where the trainee is doing well, Give feedback, Handle reaction maintaining the dignity and Plan actions. Communication and reflection also share many of the principles and steps of constructive feedback and giving regular feedback, thus, helps to improve communication and reflection. The feedback provider would be able to provide genuine feedback by following the appropriate steps and principles of constructive feedback and realize how important and rewarding its role is in teaching learning activities.

  11. Guide to the safe design, construction and use of radioisotopic power generators for certain land and sea applications

    International Nuclear Information System (INIS)

    1970-01-01

    The increasing development and production of certain types of radioisotopic power generators has indicated the need for internationally acceptable recommendations to be formulated governing the health and safety aspects of their construction and use. Accordingly, a Joint IAEA/ENEA Working Group was set up in 1966 with the task of studying the health and safety problems associated with such devices. The Working Group met twice, in April and December 1967, and prepared a draft guide to the safe design, construction and use of radioisotopic power generators. This draft guide was circulated in September 1968 to IAEA and ENEA Member States for consideration, and the comments that were subsequently received have formed the basis of a re-examination of the draft text in June 1969 by a joint IAEA/ENEA group of consultants set up by the two Agencies to bring the draft guide to its final form. This guide is intended to facilitate the establishment of an adequate standard of safety in the design, construction, installation and use of radioisotopic power generators, and in their ultimate disposal. The immediate requirement is considered to be in relation to those generators which are in an advanced state of development and production and which are designed for use on land and on o r under the sea. The guide deals mainly with radioisotopic power generators in the power range from about one hundred milliwatts to some hundred watts. However, competent national authorities may adapt these guidelines to generators outside this power range. It has been decided at this stage to exclude consideration of miniature generators for medical use, in watches and in other devices available to the general public. Generators for use in space have also been excluded.

  12. CONSTRUCTION AND POWER TEST OF THE EXTRACTION KICKER MAGNET FOR SNS ACCUMULATOR RING

    International Nuclear Information System (INIS)

    PAI, C.; HAHN, H.; HSEUH, H.; LEE, Y.; MENG, W.; MI, J.; SANDBERG, J.; TODD, R.

    2005-01-01

    Two extraction kicker magnet assemblies that contain seven individual pulsed magnet modules each will kick the proton beam vertically out of the SNS accumulator ring into the aperture of the extraction Lambertson septum magnet. The proton beam then travels to the 1.4 MW SNS target assembly. The 14 kicker magnets and major components of the kicker assembly have been fabricated in BNL. The inner surfaces of the kicker magnets were coated with TiN to reduce the secondary electron yield. All 14 PFN power supplies have been built, tested and delivered to OWL. Before final installation, a partial assembly of the kicker system with three kicker magnets was assembled to test the functions of each critical component in the system. In this paper we report the progress of the construction of the kicker components, the TIN coating of the magnets, the installation procedure of the magnets and the full power test of the kicker with the PFN power supply

  13. The application of an integrated approach to design, procurement and construction in reducing overall nuclear power plant costs. Annex 19

    International Nuclear Information System (INIS)

    Didsbury, R.; Shalaby, B.A.; Torgerson, D.F.

    2002-01-01

    As part of its on-going efforts to reduce the cost of CANDU nuclear power plants, AECL has embarked on an integrated approach to design, procurement and construction activities associated with new CANDU 6 and CANDU 9 projects. The approach is predicated on the fact there is a vast quantity of information that needs to be managed and controlled over the life of a nuclear power plant project. Therefore, ensuring the completeness and correctness of all the information needed by all project participants, facilitating sharing of this information amongst the project's participants, and automating the various deliverable production processes offers significant potential not only for overall project cost (and schedule) savings but also for reducing operations and maintenance costs once the plant enters service. Facilitating and indeed of key importance to this approach is the use of a suite of integrated information technology-based engineering, procurement and project control tools used throughout the design, engineering, procurement and construction phases of the project. A unique and important feature of these tools is their high degree of integration both from a work process and a data perspective. Use of these tools is well underway on AECL's Qinshan Project which is realizing significant benefits in cost and schedule. This paper will describe the approach AECL is taking, along with the tools it has both put in place, and those additional items planned for the future along with the cost, schedule and quality benefits that arise from their use. Progress to date on the Qinshan project also will be discussed as well as the expected application to the plant once it has gone into service will also be discussed. (author)

  14. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  15. Study of the influencies of Angra-1 nuclear power plant construction in Angra dos Reis

    International Nuclear Information System (INIS)

    Ferreira Netto, L.

    1982-01-01

    The report presents a comprehensive evaluation of the influence caused by Angra-1 Nuclear Power Plants (Central Nuclear Almirante Alvaro Alberto) construction on the Angra dos Reis City - Rio de Janeiro - Brazil. The analysis performed adopts a multi-dimensional methodology with four analysis dimensions: political-institutional, physical-territorial, social-economic and temporal. (author)

  16. СALCULATION OF INDIVIDUAL TECHNOLOGICAL NORMS PERTAINING TO EXPENDITURE OF FUEL AND POWER RESOURCES IN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    A. A. Lozovsky

    2011-01-01

    Full Text Available The paper considers private methods for calculation of individual technological norms pertaining to expenditure of fuel and power resources in  respect of main types of construction and installation works and technological processes whish are executed with the help of various machines, mechanisms, technological equipment etc. Analytical expressions that take into account various factors influencing on the power consumption level are presented in the paper.

  17. Using PROGUMBEL to predict extreme external hazards during nuclear power plant construction

    International Nuclear Information System (INIS)

    Diburg, S.; Hoelscher, N.; Niemann, H.J.; Meiswinkel, R.

    2010-01-01

    Safety considerations concerning the construction of power plants, supporting structure planning, safety concept and structural design require reliable data on external events, their incidence probability and characteristic parameters. The basis for supporting structure calculations based on probabilistic reliability considerations is the knowledge on the statistical distribution or the incidence frequency of specific phenomena and their characteristic basic variables. The extreme value statistics software PRO GUMBEL is the extended version of the original GUMBEL software used for seismic assessments. The authors describe the features of the software, that covers seismic events, flooding and extreme storms.

  18. The energy input in the construction and operation of nuclear power stations

    International Nuclear Information System (INIS)

    Kolb, G.; Niehaus, F.; Rath-Nagel, S.; Voss, A.

    1975-08-01

    The production of electric energy requires energy investments not only for direct fuel input but for the construction of power plants and for the extraction of primary energy fuels as well. When the overall energy balance of energy converting systems has to be assessed these energetic investments must be included. In the present investigation the overall energy input of different nuclear power plant types (comprising the nuclear fuel cycle) is computed and compared with a coal-fired plant. Moreover a time-dependent energy balance for the expansion of nuclear capacity according to the existing nuclear programs is calculated. Even applying only Light Water Reactors the nuclear expansion program (with an installed capacity of 50 GWsub(el) in 1985 and 170 GWsub(el) in 2000) would result in an accumulated fossil fuel saving of approximately the tenfold amount of primary energy consumed in the Federal Republic of Germany yearly today. (orig.) [de

  19. The European Commission: nuclear power has an important role to play

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    The European Commission (E.C.) thinks that nuclear power has an important role to play: first to reduce CO 2 emissions and secondly to reinforce energy self-reliance of the member states. The decision to introduce nuclear power in their energy mix belongs to every state but the E.C. has also highlighted that if adequate investment are quickly made 2 thirds of the electricity produced in the European Union in 2010 could by from low-carbon-emitting sources. Today with 148 reactors operating in 15 member countries nuclear power contributes to 1 third of the electricity produced. Another issue that is looming is the security of electricity supplying. A study has shown that the security level is worsening (particularly in winter) because of the greater part of wind energy in the energy mix as wind energy is not necessarily available when energy demand is peaking. The E.C. has proposed a new directive drawing a common standard frame for nuclear safety requirements concerning design, site selection, maintenance, operation and decommissioning of nuclear facilities. Each member state will have the choice to implement stiffer regulations. The European Union must reduce its dependency on Russian gas by increasing its storing capacities, by easing gas exchanges between member states and by importing more liquefied natural gas. European member states will have to invert 1000*10 9 euros in gas and electrical power infrastructures in the next 25 years. (A.C.)

  20. Heat transfer and fluid flow research relevant to India's nuclear power program

    International Nuclear Information System (INIS)

    Mehta, S.K.; Venkatraj, V.

    1988-01-01

    The Indian Nuclear Power Programme envisages three important stages viz., installation of thermal reactors, fast reactors and utilization of Thorium. By the year 2000 AD, it is proposed to have an installed total capacity of nuclear power of about 10,000 MWe. Starting from the present installed capacity of 1330 MWe, the additional contribution will be mainly made by thermal power reactors of the Pressurized Heavy Water type (PHWR). Apart from the reactors presently under construction about 12 numbers of 235 MWe units are planned to be constructed, which will be based on the standardized design of the reactors at Narora Atomic Power Project (NAPP). In addition, 10 units of 500 MWe capacity each, the design for which is currently under progress, will also be installed. The design, construction and operating agency is the Nuclear Power Board (NPB), while the Bhabha Atomic Research Centre (BARC) is responsible for the research and development work required. In addition to the programme on thermal power reactors, a thermal research reactor (DHRUVA) of 100 MWth capacity has been designed, constructed and has been commissioned. Some of the important heat transfer and fluid flow research problems relevant to the Indian nuclear power and research reactors are discussed in this paper

  1. Feasibility study on floating nuclear power plant (1). Conceptual design study of FNPP. Construct research

    Energy Technology Data Exchange (ETDEWEB)

    Yabuuchi, Noriaki; Shimazaki, Junya; Ochiai, Masaaki [Department of Nuclear Energy System, Tokai Research Establishment, Japan Atomic Energy Research Institute, Tokai, Ibaraki (Japan); Takahashi, Masao [Niigata Engineering Co. Ltd., Tokyo (Japan); Nakazawa, Toshio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Sato, Kazuo [Ishikawajima-Harima Heavy Industries Co. Ltd., Tokyo (Japan)

    2001-02-01

    Offshore siting methods for a nuclear power plant are classified into three types as a floating type, a settled type and a land reclamation type. The floating nuclear power plant (FNPP) has a number of advantages, such as seismic isolation, standardization of design and manufacturing, and reduction of construction period. It is, however, required for FNPP to establish the safety standards, which are different from ones for land based nuclear power plant. Investigations for this subject have not been conducted sufficiently. In this report, design study on a concept for FNPP and a review on stability evaluation for the floating platform, which were performed in order to study the safety concept of the FNPP are described. The basic concept of the FNPP are described. The basic concept for FNPP is as follows: The FNPP is sited approximately 1 - 2km off the sea coast on the open sea with water depth of about 20m and it is moored of protected sea by the breakwater, it provide a floating platform for a 1,100MWe class PWR plant. The results of design study show that the floating platform for 1,100MWe class PWR plant of 300m (L) x 80m (W) x 35m (H), and displacement of approximately 300,000 ton can be constructed in a dockyard. This floating platform guarded by the breakwater is found to be stable enough to install the nuclear power plant from the analysis simulating the movement of the platform due to sea wave or wind. (author)

  2. Strategy and implementation of resources control of key equipments in nuclear power plant

    International Nuclear Information System (INIS)

    Zha Qing

    2014-01-01

    The strategic resources of the construction of nuclear power plant, which include the main equipment of nuclear island, heavy forgings, the bottleneck equipment and strategic materials, is one of the key issues in the construction of nuclear power projects. The control of these strategic resources has become the focus of competition in industry and the major nuclear power groups are willing to fight for this huge advantages. The resource control strategies of key equipment of nuclear power projects are analyzed in this paper. This paper put forward specific measures and methods for the strategic resources control. By the application to a plurality of nuclear power engineering construction projects, these specific measures and methods achieved good results and will be with important guidance and reference for the construction of future nuclear power projects in China. (author)

  3. SPS microwave subsystem potential impacts and benefits. [environmental and societal effects of Solar Power System construction and operation

    Science.gov (United States)

    Dickinson, R. M.

    1978-01-01

    The paper examines the possible environmental and societal effects of the construction, installation, and operation of the space end and earth end of the microwave power transmission subsystem that delivers satellite power system (SPS) energy (at about 5 GW per beam) to the power grid on earth. The intervening propagation medium near the earth is also considered. Separate consideration is given to the spacecraft transmitting array, propagation in the ionosphere, and the ground-based rectenna. Radio frequency interference aspects are also discussed.

  4. 76 FR 11205 - Taking and Importing Marine Mammals; Taking Marine Mammals Incidental to Construction and...

    Science.gov (United States)

    2011-03-01

    ... Importing Marine Mammals; Taking Marine Mammals Incidental to Construction and Operation of a Liquefied Natural Gas Deepwater Port in the Gulf of Mexico AGENCY: National Marine Fisheries Service (NMFS... request from Port Dolphin Energy LLC (Port Dolphin) for authorization for the take, by Level B harassment...

  5. Nuclear power project management information system

    International Nuclear Information System (INIS)

    Zou Lailong; Zhang Peng; Xiao Ziyan; Chun Zengjun; Huang Futong

    2001-01-01

    Project Management Information System is an important infrastructure facility for the construction and operation of Nuclear Power Station. Based on the practice of Lingao nuclear power project management information system (NPMIS), the author describes the NPMIS design goals, system architecture and software functionality, points out the outline issues during the development and deployment of NPMIS

  6. Differentiating youth who are bullied from other victims of peer-aggression: the importance of differential power and repetition.

    Science.gov (United States)

    Ybarra, Michele L; Espelage, Dorothy L; Mitchell, Kimberly J

    2014-08-01

    To examine whether (1) among youth who report being bullied, differential power and repetition are useful in identifying youth who are more or less affected by the victimization experience and (2) bullying and more generalized peer aggression are distinct or overlapping constructs. Data for the Teen Health and Technology study were collected online between August 2010 and January 2011 from 3,989 13- to 18-year-olds. Data from the Growing up with Media study (Wave 3) were collected online in 2008 from 1,157 12- to 17-year-olds. In the Teen Health and Technology study, youth who reported neither differential power nor repetition had the lowest rates of interference with daily functioning. Youth who reported either differential power or repetition had higher rates, but the highest rates of interference with daily functioning were observed among youth who reported both differential power and repetition. In the Growing up with Media study, youth were victims of online generalized peer aggression (30%) or both online generalized peer aggression and cyberbullying (16%) but rarely cyberbullying alone (1%). Both differential power and repetition are key in identifying youth who are bullied and at particular risk for concurrent psychosocial challenge. Each feature needs to be measured directly. Generalized peer aggression appears to be a broader form of violence compared with bullying. It needs to be recognized that youth who are victimized but do not meet the criteria of bullying have elevated rates of problems. They are an important, albeit nonbullied, group of victimized youth to be included in research. Copyright © 2014 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  7. Construction and characterization of spherical Si solar cells combined with SiC electric power inverter

    Science.gov (United States)

    Oku, Takeo; Matsumoto, Taisuke; Hiramatsu, Kouichi; Yasuda, Masashi; Shimono, Akio; Takeda, Yoshikazu; Murozono, Mikio

    2015-02-01

    Spherical silicon (Si) photovoltaic solar cell systems combined with an electric power inverter using silicon carbide (SiC) field-effect transistor (FET) were constructed and characterized, which were compared with an ordinary Si-based converter. The SiC-FET devices were introduced in the direct current-alternating current (DC-AC) converter, which was connected with the solar panels. The spherical Si solar cells were used as the power sources, and the spherical Si panels are lighter and more flexible compared with the ordinary flat Si solar panels. Conversion efficiencies of the spherical Si solar cells were improved by using the SiC-FET.

  8. Environmental studies in conjunction with the construction of nuclear power plants Pt. 2

    International Nuclear Information System (INIS)

    Horvath, L.G.; Bede, G.; Gacs, I.

    1980-01-01

    A status-of-the-art report is presented to summarize the studies in progress in Hungary concerning the radionuclide release of nuclear power plants and the motion and migration of radionuclides in the atmosphere. The presently available computerized models are described, their objectives, performances and advantages are discussed. Some examples are given to illustrate the applicability of the various models. They will be adapted to the local environmental, meteorological and architectural conditions of the Paks nuclear power plant under construction. The cooperation of research groups participating in the development or adaption of the different computerized models will continue during the start-up and operation of the Paks-1 reactor and the models will be improved on the basis of field experiences. New models will also be developed. (D.Gy.)

  9. Nuclear power and related safety issues

    International Nuclear Information System (INIS)

    Valdezco, Eulinia M.

    2009-01-01

    There are a cluster of trends that reinforce the importance of nuclear power on the world scene. Energy is the essential underpinning for economic and societal progress and, as the developing world advances, the demand for energy is growing significantly. At the same time, the carbon-intensive sources of energy on which the world has traditionally relied - in particular, coal, oil, and natural gas - pose grave threats because the growing concentrations of carbon dioxide in the atmosphere will bring about climate and ocean acidification. At the same time, rising and volatile fossil fuel prices, coupled with concerns about the security of supplies of oil and gas, enhance interest in sources of energy that do not pose the same costs and risks. As an important part of the world's response to these threats, many countries are embarking on either new or expanded nuclear power programs, more commonly referred to as a nuclear renaissance. The construction of nuclear power plants is under consideration in over thirty countries that do not currently use nuclear power. For new entrants that may have experience in constructing and operating large-scale industrial and infrastructure projects, they may not be fully familiar with the unique requirements of nuclear power and may not be fully recognize the major commitments and understandings that they must assume. Additionally, an understanding of the full range of obligations may have diminished in those countries with only one or a few reactors and where nuclear construction has not been undertaken for a long time. It is therefore in the interest of all to ensure that every country with a nuclear power program has the resources, expertise, authority and capacity to assure safety in a complete and effective manner and is committed to doing so. This presentation will outline some of the more important national infrastructure considerations including nuclear safety issues for launching a nuclear power program. An update on the

  10. Analysis and evaluation of status reports for quality assurance practice in nuclear power plant construction

    International Nuclear Information System (INIS)

    1984-01-01

    The study elaborates the structure and definitions of a general description of quality assurance systems with respect to planning and construction of nuclear power plants and indicates standards concerning the production and adaption of structural components. It is suggested to introduce in the licensing procedure the so-called comprehensive constructional report by an expert. For contractors, tasks and responsibilities of the major companies with regard to quality assurance are expressly stipulated. The study also suggests the inclusion of ARGEN, the elaboration of production and test sequence plans and the introduction of a control and evaluation system for the feedback of experience among companies involved and ARGEN. (DG) [de

  11. Ground assessment methods for nuclear power plant

    International Nuclear Information System (INIS)

    1985-01-01

    It is needless to say that nuclear power plant must be constructed on the most stable and safe ground. Reliable assessment method is required for the purpose. The Ground Integrity Sub-committee of the Committee of Civil Engineering of Nuclear Power Plant started five working groups, the purpose of which is to systematize the assessment procedures including geological survey, ground examination and construction design. The works of working groups are to establishing assessment method of activities of faults, standardizing the rock classification method, standardizing assessment and indication method of ground properties, standardizing test methods and establishing the application standard for design and construction. Flow diagrams for the procedures of geological survey, for the investigation on fault activities and ground properties of area where nuclear reactor and important outdoor equipments are scheduled to construct, were established. And further, flow diagrams for applying investigated results to design and construction of plant, and for determining procedure of liquidification nature of ground etc. were also established. These systematized and standardized methods of investigation are expected to yield reliable data for assessment of construction site of nuclear power plant and lead to the safety of construction and operation in the future. In addition, the execution of these systematized and detailed preliminary investigation for determining the construction site of nuclear power plant will make much contribution for obtaining nation-wide understanding and faith for the project. (Ishimitsu, A.)

  12. Marital Construction of Family Power among Male-out-Migrant Couples in a Chinese Village: A Relation-Oriented Exchange Model

    Science.gov (United States)

    Zuo, Jiping

    2008-01-01

    This study examines marital construction of family power among male-out-migrant couples in a Chinese village in Guangxi Province. In-depth interviews show that male-out-migrant couples prefer joint decision making. When couples are in disputes, power tends to go to the ones who shoulder greater household-based responsibilities; in this case, they…

  13. Social and psychological problems of nuclear power: perception of NPP construction and environmental risk

    International Nuclear Information System (INIS)

    Malenchenko, A.F.; Sushko, S.N.; Saltanova, I.V.; Tushin, N.N.; Kozlovskaya, A.V.; Bortnovskij, V.N.; Dorofeeva, S.M.; Gapanovich-Kajdalov, N.V.; Gapanovich-Kajdalova, E.V.

    2013-01-01

    The paper presents the analysis of questioning about perception of nuclear power plant construction in Belarus and about concomitant environmental risk. The opinion poll has been conducted among students of: Department of Environmental Monitoring of the International A. Sakharov Environmental University, Physics Department of Belarus State University, Department of General Hygienic and Environmental Medicine of Gomel State Medical University, Faculty of Mechanical Engineering of Minsk Polytechnic College. (authors)

  14. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  15. Design and construction features of steam generators at a nuclear power station

    International Nuclear Information System (INIS)

    Chakrabarti, A.K.; Gupta, K.N.; Bapat, C.N.; Sharma, V.K.

    1996-01-01

    The Indian nuclear power programme is based on Pressurised Heavy Water Reactors (PHWRs) using natural uranium as fuel and heavy water as reactor coolant as well as moderator. The nuclear heat is generated in the fuel located in the pressure tubes. Pressurised heavy water in the primary heat transport (PHT) system is circulated through the tubes which picks up the heat from the fuel and transfers it to ordinary water in steam generators (SGs) to produce steam. The steam is used for providing power to the turbine. The steam generator is a critical equipment in the nuclear steam supply system (NSSS) of a nuclear reactor. SG tube surface area constitute about 80% of total primary circuit surface area. A typical value in a 220 MWe reactor is 9000 m 2 which can release considerable amount of corrosion products unless very low corrosion rates are achieved by proper design, material selection and water chemistry control. Design and construction features of SGs are given. 1 tab

  16. Security during the Construction of New Nuclear Power Plants: Technical Basis for Access Authorization and Fitness-For-Duty Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Branch, Kristi M.; Baker, Kathryn A.

    2009-09-01

    A technical letter report to the NRC summarizing the findings of a benchmarking study, literature review, and workshop with experts on current industry standards and expert judgments about needs for security during the construction phase of critical infrastructure facilities in the post-September 11 U.S. context, with a special focus on the construction phase of nuclear power plants and personnel security measures.

  17. Quality during construction

    International Nuclear Information System (INIS)

    Rogers, C.B.

    1977-01-01

    This paper outlines the quality assurance program used by Bechtel Corp. in constructing Nuclear Power Plants. As a tool for scheduling and visualizing situations during construction, power plant scale models are used. The use of models, preplanning, detail scheduling, and early development of procedures and inspection plans, have all contributed to a lower cost integrated quality program. Quality control and quality assurance are built in, thus satisfying the regulatory requirements

  18. Public acceptance of constructing coastal/inland nuclear power plants in post-Fukushima China

    International Nuclear Information System (INIS)

    Wu, Yican

    2017-01-01

    Risk perception and public involvement have become more and more important in post-Fukushima accident era. A survey had been carried out about public acceptance of constructing coastal/inland Nuclear Power Plants (NPPs) in China. We examined impact factors of public acceptance of nuclear energy and also carried out a comparison between China and OECD. The study revealed that the public still took relatively optimistic attitude although there was a slight decrease just after Fukushima and the public's confidence recovered four years later. The ratio of inland NPPs opponents reached to quite a high level and “not-in-my-back-yard” still reflected an obvious syndrome. We also found public acceptance is mainly affected by benefit and, to a lesser extent, by knowledge, education and age. Moreover, the study suggested government is still a creditable information resource due to its authority but most of respondents felt little or no well-informed about nuclear safety, which means a significant communication gap exists between government and the public. As China is the most ambitious country to develop nuclear energy, it is proposed to introduce a transparent and open system of third-party evaluation, which mainly consists of scientists and non-profit research institutions, to ensure the healthy and sustainable development of nuclear energy. - Highlights: • The public are more optimistic about nuclear energy in China than in OECD. • The ratio of inland nuclear power plants opponents reaches to quite a high level. • Government is still a creditable information resource due to its authority. • Third-party evaluation is proposed to intervene in nuclear safety supervision.

  19. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  20. Problems associated with the export of nuclear power plants

    International Nuclear Information System (INIS)

    1978-01-01

    Full text: Recent forecasts indicate that by the year 2000 there will be more than 1000 nuclear power plants operating in 50 countries and with several countries expecting to derive one-half or more of their electric generation from nuclear power plants At present only six countries are exporters of nuclear power systems, three more currently supply their own domestic markets, while the remainder are importers. It is expected that most of the importers will continue to depend to varying degrees on foreign supply, at least in the near future. If nuclear power is to offer an important benefit to the world, the achievement of this benefit will require co-operation between the supplying and receiving nations in overcoming problems which might inhibit the full development of this energy source. In addition to ensuring safety and reliability, special problem areas include financing, skilled manpower needs, adequate local industrial and engineering infrastructure, access to advanced technology, and an assured supply of nuclear fuel. The symposium had special emphasis on the problems facing many of the developing countries in the initial stages of nuclear power programmes, and was divided into three major topics nuclear safety, domestic contributions, and international aspects In the safety area, emphasis was given to the special considerations that may exist for countries that import nuclear plants. These special considerations can be due to some non-standard features of the exported reactor such as lower power ratings, dissimilar site characteristics that can effect the design, and the evolution and changes in design and safety requirements during construction. This can be complicated by differences in safety philosophy and codified standards of the various suppliers and unique construction problems in the less developed countries. Thus, the ability of the importing country to carry out the regulatory and safety function is obviously important. A number of presentations

  1. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  2. Environmental aspects of nuclear power

    International Nuclear Information System (INIS)

    Ward, D.P.

    1988-01-01

    Nuclear power provides the world with an important option for generating electricity. To successfully and safely utilize this power, engineering and environmental factors should be carefully considered throughout a nuclear power plant project, especially during the planning stages. This paper discusses the major environmental aspects of a nuclear power plant project from site selection to retirement. During the site selection process, both engineering and environmental resources must be identified and evaluated. Environmental resources include areas that support agricultural or aquatic commercial activities, habitats for commercial or endangered species, population centers, transportation systems, and recreational areas. Also during the site selection process, the potential impacts of both construction and operating activities must be considered. In addition to the area actually disturbed by construction, construction activities also affect local services, such as transportation systems, housing, school systems, and other social services. Since nuclear power plants use a ''clean fuel,'' generally the most significant operating activity having a potential environmental impact is the discharge of cooling water. The potential effect of this discharge on commercial activities and sensitive habitats should be thoroughly evaluated. Lastly, the method of decommissioning can affect long-range land use planning and should therefore be considered during the planning process

  3. Fault diagnosis of power transformer based on fault-tree analysis (FTA)

    Science.gov (United States)

    Wang, Yongliang; Li, Xiaoqiang; Ma, Jianwei; Li, SuoYu

    2017-05-01

    Power transformers is an important equipment in power plants and substations, power distribution transmission link is made an important hub of power systems. Its performance directly affects the quality and health of the power system reliability and stability. This paper summarizes the five parts according to the fault type power transformers, then from the time dimension divided into three stages of power transformer fault, use DGA routine analysis and infrared diagnostics criterion set power transformer running state, finally, according to the needs of power transformer fault diagnosis, by the general to the section by stepwise refinement of dendritic tree constructed power transformer fault

  4. Surveillance of items important to safety in nuclear power plants

    International Nuclear Information System (INIS)

    1990-01-01

    The Guide was prepared as part of the IAEA's programme, referred to as the NUSS Programme, for establishing Codes and Safety Guides relating to nuclear power plants. THe Guide supplements the Code on the Safety of Nuclear Power Plants: Operation, IAEA Safety Series No. 50-C-O(Rev.1). The operating organization has overall responsibility for the safe operation of the nuclear power plant. Therefore, it shall ensure that adequate surveillance activities are carried out in order to verify that the plant is operated within the prescribed operational limits and conditions, and to detect in time any deterioration of structures, systems and components as well as any adverse trend that could lead to an unsafe condition. These activities can be classified as: Monitoring plant parameters and system status; Checking and calibrating instrumentation; Testing and inspecting structures, systems and components. This Safety Guide provides guidance and recommendations on surveillance activities to ensure that structures, systems and components important to safety are available to perform their functions in accordance with design intent and assumptions

  5. Problems and experience of regulatory review associated with plant construction and commissioning

    International Nuclear Information System (INIS)

    Commander, W.

    1979-01-01

    The work of the Assessment Branch of NII covering the regulatory review during design safety assessment, construction, commissioning and operation is described commencing with the nuclear licensing procedure through licence variations and conditions attached to the licence, to the final stages of plant construction up to commercial operation and full power production. The importance of the application of safety assessment principles is outlined, the importance of the Safety Inspectorate Schedule described, and the need to retain organisational and regulatory flexibility emphasised. (author)

  6. Discussion on mass concrete construction of wind turbine generator foundation

    Science.gov (United States)

    Shang, Liang; Wu, Chaoxiang; Yin, Xiaoyong

    2018-04-01

    Wind power is one of the main power sources currently. China has rich wind power resources, wind power plants are developed faster and faster. However, China wind power construction started late, which is lack of relevant experience technology. It is easy to produce quality problems. The key to the construction quality of wind power plant is the construction quality of mass concrete construction. Therefore, construction technology and quality control of wind turbine generator foundation mass concrete are discussed and analyzed in the paper.

  7. First decade: TVA's first ten years of nuclear power plant design and construction experience

    International Nuclear Information System (INIS)

    Willis, W.F.

    1978-01-01

    This paper reviews the experience of the Tennessee Valley Authority's design and construction program for nuclear power plants in terms of schedule and capital costs in three separate phases. Phase one recapitulates the status of the nuclear power industry in 1966 and sets forth the assumptions used for estimating capital costs and projecting schedules for the first Tennessee Valley Authority units. Phase two describes what happened to the program in the hectic early 1970s in terms of expansion of scope (particularly for safety features), the dramatic increase in regulatory requirements, vendor problems, stretchout of project schedules, and unprecented inflation. Phase three addresses the assumptions used today in estimating schedules and plant costs for the next 10-year period. 7 figures, 7 tables

  8. Projected role of nuclear power in Egypt and problems encountered in implementing the first nuclear power plant

    International Nuclear Information System (INIS)

    Effat, K.E.A.; Sirry, H.; El-Sharkawy, E.

    1977-01-01

    The increasing rise in fossil-fuel prices has favourably affected the economics of nuclear power generation bringing down the economically competitive size of nuclear units closer to small sizes compatible with grid capacities in developing countries. This encouraged Egypt to turn to nuclear power to fulfil its future power needs. In implementing its first nuclear power plant, Egypt is facing various problems. The capacity of the national electric power system and its inherent characteristics pose certain restrictions on the size and design of the nuclear plant required. The availability of sufficient local qualified management, engineering and technical personnel to participate in both precontractual and construction phases of the plant is quite a major problem. Lack of local developed industry to back up the construction phase implies the dependence to a large extent on imported equipment, materials and technology. The paper reviews the present and projected power demands in Egypt and the factors behind the decision to introduce a nuclear power generation programme. Various problems encountered and anticipated in introducing the first nuclear power plant are also discussed. (author)

  9. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  10. Competitiveness of nuclear power generation

    International Nuclear Information System (INIS)

    Sumi, Yoshihiko

    1998-01-01

    In view of the various merits of nuclear power generation, Japanese electric utilities will continue to promote nuclear power generation. At the same time, however, it is essential to further enhance cost performance. Japanese electric utilities plan to reduce the cost of nuclear power generation, such as increasing the capacity factor, reducing operation and maintenance costs, and reducing construction costs. In Asia, nuclear power will also play an important role as a stable source of energy in the future. For those countries planning to newly introduce nuclear power, safety is the highest priority, and cost competitiveness is important. Moreover, financing will be an essential issue to be resolved. Japan is willing to support the establishment of nuclear power generation in Asia, through its experience and achievements. In doing this, support should not only be bilateral, but should include all nuclear nations around the Pacific rim in a multilateral support network. (author)

  11. Geomorphologic specificities of selected sites for nuclear power plants in Czechoslovakia

    International Nuclear Information System (INIS)

    Kalvoda, J.; Demek, J.

    1991-01-01

    The contribution of geomorphology to the complex evaluation of properties of sites for the construction and operation of nuclear facilities is demonstrated. The unique manifestation of the present geodynamics at the Jaslovske Bohunice nuclear power plant locality and the spatial correlations of annals of the specific morphotectonic development of georeliefs of that nuclear power plant with the location of the epicentral earthquake zones are shown. The results of the geomorphological survey in the surroundings of the Temelin nuclear power plant construction site are described and a drawing is reproduced showing how the georelief of this locality divides into areas with different categories of occurrence of morpho-structural formations. For the Tetov locality, where the construction of a nuclear power plant is planned, the changes in the course of the Labe (Elbe) river which occurred in the Pleistocene are of importance in the assessment of the intensity of geodynamic processes. The geomorphological and geotectonic complexity of the planned Blahutovice nuclear power plant construction site is demonstrated. A drawing shows the morphotectonic situation in the surroundings of that construction site. (Z.S.). 4 figs

  12. Design, construction and testing of a self-powered neutron detector

    International Nuclear Information System (INIS)

    Correa, R.F.

    1987-01-01

    The design, construction and testing of a self-powered neutron detector (SPN) and associated electronics are described. Several tests were performed giving information about dielectrical properties of detector and cable, gamma spectra induced in the detector through reactor irradiation, detector response as a function of neutron flux, current stability and reproductibility with the neutron flux. The gamma and neutron sensitivities were also evaluated, by means of thermoluminescent dosimeters and gold foils as references. The test results are presented and show that the detector response is reliable. The gamma and neutron sensitivities are in agreement with those found in the available literature. Nevertheless, a ceramic insulated cable should be employed for permanent use in a reactor. The tests were performed in a 100 KW TRIGA Mark I reactor at the Centro de Desenvolvimento da Tecnologia Nuclear of NUCLEBRAS, in Belo Horizonte, Brazil. (author) [pt

  13. 78 FR 27470 - Culturally Significant Objects Imported for Exhibition Determinations: “Shaping Power: Luba...

    Science.gov (United States)

    2013-05-10

    ... Determinations: ``Shaping Power: Luba Masterworks From the Royal Museum for Central Africa'' SUMMARY: Notice is... objects to be included in the exhibition ``Shaping Power: Luba Masterworks from the Royal Museum for Central Africa,'' imported from abroad for temporary exhibition within the United States, are of cultural...

  14. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume II. Exhibits

    International Nuclear Information System (INIS)

    1985-01-01

    This exchange is between BPA and Portland General Electric Company, Puget Sound Power and Light Company, and the Washington Water Power Company. Pacific Power and Light Company (Pacific) is not initially a party to the exchange. Pacific may at any time prior to January 1, 1994 elect on at least 12 months notice to enter the exchange provided that if BPA determines to resume full plant construction Pacific must elect or forego the option within 6 months after construction is resumed. If the plant is terminated at a time when the option has not been exercised, the option may not thereafter be exercised. If Pacific elects to make the exchange effective and the plant is later terminated prior to the effective data of the exchange, the exchange will become effective on the specified data, unless, prior to such data. Pacific notifies BPA that is rescinds such prior election

  15. The financing of nuclear power plants

    International Nuclear Information System (INIS)

    Taylor, M.

    2009-01-01

    Existing nuclear generating capacity plays an important role in providing secure, economic and low-carbon electricity supplies in many OECD countries. At the same time, there is increasing recognition that an expansion of nuclear power could play a valuable role in reducing future carbon dioxide emissions. However, in recent years only a handful of new nuclear power plants (NPPs) have been built in just a few OECD countries. An important reason for this is the challenges associated with financing the construction of new NPPs

  16. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  17. A Contemporary Analysis of the O'Neill-Glaser Model for Space-Based Solar Power and Habitat Construction

    Science.gov (United States)

    Curreri, Peter A.; Detweiler, Michael K.

    2011-01-01

    In 1975 Gerard O Neill published in the journal Science a model for the construction of solar power satellites. He found that the solar power satellites suggested by Peter Glaser would be too massive to launch economically from Earth, but could be financially viable if the workforce was permanently located in free space habitats and if lunar and asteroid materials were used for construction. All new worldwide electrical generating capacity could be then achieved by solar power satellites. The project would financially break even in about 20 years after which it would generate substantial income selling power below fossil fuel prices. Two NASA / Stanford University led studies at Ames Research center during the summers of 1974 and 1976 found the concept technically sound and developed a detailed financial parametric model. Although the project was not undertaken when suggested in the 1970s, several contemporary issues make pursuing the O Neill -- Glaser concept more compelling today. First, our analysis suggests that if in the first ten years of construction that small habitats (compared to the large vista habitats envisioned by O Neill) supporting approximately 300 people were utilized, development costs of the program and the time for financial break even could be substantially improved. Second, the contemporary consensus is developing that carbon free energy is required to mitigate global climate change. It is estimated that 300 GW of new carbon free energy would be necessary per year to stabilize global atmospheric carbon. This is about 4 times greater energy demand than was considered by the O Neill Glaser model. Our analysis suggests that after the initial investments in lunar mining and space manufacturing and transportation, that the profit margin for producing space solar power is very high (even when selling power below fossil fuel prices). We have investigated the financial scaling of ground launched versus space derived space solar power satellites. We

  18. Future perspective of cost for nuclear power generation

    International Nuclear Information System (INIS)

    Maeda, Ichiro

    1988-01-01

    The report presents and discussed results of evaluation of the cost for power generation in this and forthcoming years on the basis of an analysis of the current fuel prices and the economics of various power sources. Calculations show that nuclear power generation at present is inferior to coal-firing power generation in terms of required costs, but can become superior in the future due to an increased burn-up and reduced construction cost. Investigations are made of possible contributions of future technical improvements to reduction in the overall cost. Results suggest that nuclear power generation will be the most efficient among the various electric sources because of its technology-intensive feature. Development of improved light water reactors is of special importance to achieve a high burn-up and reduced construction costs. In general, the fixed cost accounts for a large part of the overall nuclear power generation cost, indicating that a reduction in construction cost can greatly increase the economic efficiency. Changes in the yen's exchange rate seem to have little effect on the economics of nuclear power generation, which represents another favorable aspect of this type of energy. (Nogami, K.)

  19. Construction of a dog training device with high frequency and high power pulses

    International Nuclear Information System (INIS)

    Viaud Trejos, Rafael Alfonso

    2013-01-01

    An electronic device is built to produce high frequency and high power sound. The device is used in training and control of dogs. Commercial ultrasonic devices used for dog training are analyzed. The best strategies and components of the design are determined from an electronic device to produce sounds in frequency from 15kHz to 50Khz. Effectiveness tests are performed to establish the adequate design of the ultrasonic electronic device. The test results are analyzed to find opportunities of improvement in the design or construction of the device [es

  20. 18 CFR 401.124 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Construction. 401.124 Section 401.124 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE General Provisions § 401.124 Construction. This part is...

  1. Imported mineral coal: competitiveness for electric power generation in northeast of Brazil

    International Nuclear Information System (INIS)

    Codeceira Neto, A.; Ribeiro Filho, A.P.R.; Silva, S.P.R. da

    1993-01-01

    With the hydroelectric potential exhaustion of northeast and with the increase of costs to the use of hydroelectric uses available in Brazil, the thermoelectric generation will be able to become a competitive solution to attend the market of electric power. This work has as purpose describe the options of imported coal use to Brazilian northeast its technological aspects, the environmental question, and the preliminary studies of localization and the costs associated on implantation of coal thermoelectric power plants. 7 refs, 3 figs, 6 tabs

  2. Constructing Multidatabase Collections Using Extended ODMG Object Model

    Directory of Open Access Journals (Sweden)

    Adrian Skehill Mark Roantree

    1999-11-01

    Full Text Available Collections are an important feature in database systems. They provide us with the ability to group objects of interest together, and then to manipulate them in the required fashion. The OASIS project is focused on the construction a multidatabase prototype which uses the ODMG model and a canonical model. As part of this work we have extended the base model to provide a more powerful collection mechanism, and to permit the construction of a federated collection, a collection of heterogenous objects taken from distributed data sources

  3. Constructing A Multi-Microgrid with the Inclusion of Renewable Energy in Oman's Rural Power System

    Directory of Open Access Journals (Sweden)

    Nasser Hosseinzadeh

    2018-01-01

    Full Text Available This paper investigates the possibility of constructing multi-microgrids by interlinking the rural area systems in the Al Wusta governorate of the Sultanate of Oman, which are currently being supplied by diesel generators. It is proposed to enhance the rural system under study by switching off small diesel stations and replacing them with wind turbines. The microgrids formed in this way are then interlinked together to create multi-microgrids. The paper studies the interlinked multi-microgrids under different scenarios; in terms of voltage profiles and power flow using the ETAP software package. This study contributes to the feasibility study of retiring some diesel power plants and using renewable energy resources in rural Oman.

  4. Impact of Nuclear Power and Desalination Plant Construction Toward National and East Java Economic

    International Nuclear Information System (INIS)

    Ratya-Anindita; Sriyana; M-Nasrullah

    2006-01-01

    The objective of this study is to determine the economic impacts of the construction of the nuclear power plant 2 x 100 MW(e) SMART type with desalination 4 x 10,000 m 3 which would conduct in years 2008 to 2017 in Madura Island, East Java. The predicted IO tables of 2008-2017 have been created by the application of dynamic IO projection. The economic impact was estimated through multiplier effect which covers direct impact and indirect impact as well as the induced effect. The expenditures of SMART nuclear power and desalination plant to the domestic contractors is estimated to amount to 88.2 million US dollar or 25.6 % of the whole expenditures. The total impact of the project to the national economy would be Rp. 6,329,347 million, Rp. 8,439,130 million, and Rp. 12,658,695 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively for the scenario of dynamic growth. The total impact of the project to the provincial economy of East Java would be as much as Rp. 3,253,498 million, Rp. 4,337,997 million, and Rp. 6,506,995 million for each scenario of the exchange rate as high as Rp. 7,500/US dollar, Rp. 10,000/US dollar, Rp. 15,000/US dollar, respectively under the former scenario. Cumulative direct impact since pre-construction to construction period had been calculated as much as US dollar 101.8 million for sectors number 48.52 and 62. This have brought much impact on other sectors in national or provincial levels of economy. (author)

  5. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  6. Nuclear power plants. The market for services, retrofitting, construction of new plants and dismantling of older plants in Europe through 2030

    International Nuclear Information System (INIS)

    Briese, Dirk; Hoemske, Tom

    2010-01-01

    The power plant scene in Europe is characterized by new power plant projects and retrofitting projects everywhere. This is due to the ageing of existing power plants and to increasing energy demand. Currently, there are projects for 48 power plant units with an installed capacity of 70 GW. According to a study of the nuclear power plant sector, about 16 GW will probably be constructed prior to 2030. The reference scenario presented in this article assumes a dynamic increase of 15 thousand million Euros per annum through 2016/2018. (orig.)

  7. Construction of Earthquake-Proof Safety Evaluation Methods for Pipes with Wall Thinning

    International Nuclear Information System (INIS)

    Miyano, Hiroshi; Sekimura, Naoto; Takizawa, Masayuki; Matsumoto, Masaaki

    2012-01-01

    After the accident at the Fukushima Daiichi Nuclear Power Plant, the extreme importance of 'system safety' evaluation has been recognized. In this study, some fundamental ways of thinking about the concept of 'system safety' for operating plants is shown, and concrete evaluation structures of system safety are proposed. System safety for nuclear power plants and safety assessment for aging plants are constructed. (author)

  8. Critical Power: An Important Fatigue Threshold in Exercise Physiology

    Science.gov (United States)

    Poole, David C.; Burnley, Mark; Vanhatalo, Anni; Rossiter, Harry B.; Jones, Andrew M.

    2016-01-01

    The hyperbolic form of the power-duration relationship is rigorous and highly conserved across species, forms of exercise and individual muscles/muscle groups. For modalities such as cycling, the relationship resolves to two parameters, the asymptote for power (critical power, CP) and the so-called W′ (work doable above CP), which together predict the tolerable duration of exercise above CP. Crucially, the CP concept integrates sentinel physiological profiles - respiratory, metabolic and contractile - within a coherent framework that has great scientific and practical utility. Rather than calibrating equivalent exercise intensities relative to metabolically distant parameters such as the lactate threshold or V̇O2 max, setting the exercise intensity relative to CP unifies the profile of systemic and intramuscular responses and, if greater than CP, predicts the tolerable duration of exercise until W′ is expended, V̇O2 max is attained, and intolerance is manifested. CP may be regarded as a ‘fatigue threshold’ in the sense that it separates exercise intensity domains within which the physiological responses to exercise can (CP) be stabilized. The CP concept therefore enables important insights into 1) the principal loci of fatigue development (central vs. peripheral) at different intensities of exercise, and 2) mechanisms of cardiovascular and metabolic control and their modulation by factors such as O2 delivery. Practically, the CP concept has great potential application in optimizing athletic training programs and performance as well as improving the life quality for individuals enduring chronic disease. PMID:27031742

  9. Critical Power: An Important Fatigue Threshold in Exercise Physiology.

    Science.gov (United States)

    Poole, David C; Burnley, Mark; Vanhatalo, Anni; Rossiter, Harry B; Jones, Andrew M

    2016-11-01

    : The hyperbolic form of the power-duration relationship is rigorous and highly conserved across species, forms of exercise, and individual muscles/muscle groups. For modalities such as cycling, the relationship resolves to two parameters, the asymptote for power (critical power [CP]) and the so-called W' (work doable above CP), which together predict the tolerable duration of exercise above CP. Crucially, the CP concept integrates sentinel physiological profiles-respiratory, metabolic, and contractile-within a coherent framework that has great scientific and practical utility. Rather than calibrating equivalent exercise intensities relative to metabolically distant parameters such as the lactate threshold or V˙O2max, setting the exercise intensity relative to CP unifies the profile of systemic and intramuscular responses and, if greater than CP, predicts the tolerable duration of exercise until W' is expended, V˙O2max is attained, and intolerance is manifested. CP may be regarded as a "fatigue threshold" in the sense that it separates exercise intensity domains within which the physiological responses to exercise can (CP) be stabilized. The CP concept therefore enables important insights into 1) the principal loci of fatigue development (central vs. peripheral) at different intensities of exercise and 2) mechanisms of cardiovascular and metabolic control and their modulation by factors such as O2 delivery. Practically, the CP concept has great potential application in optimizing athletic training programs and performance as well as improving the life quality for individuals enduring chronic disease.

  10. Identifying Issues in Applying Integrated Project Delivery to Domestic Nuclear Power Plant Construction Projects

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Joo [Korean Nuclear Society, Daejeon (Korea, Republic of)

    2016-05-15

    Integrated Project Delivery (IPD) is defined as that people, systems, business structures, and practices of key stakeholders are incorporated into a single-team, with a single process, which executes a project in a way of optimizing the project's outcome, increasing values delivered to the end user, reducing waste, and maximizing efficiency throughout the phases of engineering to construction. The researcher had carried out literature review in terms of IPD to identify major characteristics of IPD which are presented in the following section and had compared such characteristics against peculiarities of nuclear power plant (NPP) construction projects in order to shed light on obstacles in possible application of IPD method to domestic NPP construction projects in the coming days. In this research, three (3) major characteristics of IPD were identified: 1) key stakeholders signing one balanced contract, forming de facto one body, sharing risk and reward 2) an integrated project team being formed in the early stage of a project and providing input to minimize time and cost loss from rework downstream 3) team members co-locating, having open and direct communication, making decisions on time, and pursuing the success of the project itself.

  11. Structural health monitoring and lifecycle-management for civil engineering constructions in power plants and industrial facilities; Zustandsueberwachung und Lebensdauermanagement von baulichen Einrichtungen in Kraftwerken und Industrieanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Lehnen, Dieter; Demmer, Martin; Pfister, Tobias [ZERNA Planen und Pruefen GmbH, Bochum (Germany)

    2013-09-01

    In contrast to other fields of engineering, structural health monitoring and lifecycle management for civil engineering constructions in power plants and industrial facilities have to be developed yet. The necessity of this development immediately arises from the building regulations law with its extensive set of regulations as well as from economic constraints. Approaches and methods of structural health monitoring and lifecycle management for civil engineering constructions in power plants and industrial facilities could be improved intensively during recent years. The paper focuses on practical examples that show the necessity of comprehensive and strategic structural health monitoring in conjunction with lifecycle management for civil engineering constructions in power plants and industrial facilities unambiguously und clear. (orig.)

  12. Approach to improve construction management utilizing information technology

    International Nuclear Information System (INIS)

    Lee, Woo Bang; Moon, Jin Yeong

    2003-01-01

    Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved

  13. Technique treatment of early stage support construction system for Gaoling mountain tunnel engineering of Daya Bay nuclear power station

    International Nuclear Information System (INIS)

    Ma Keli

    2010-01-01

    This article studies the technical treatment of primary support system used in Gaoling mountain tunnel construction process at Daya by nuclear power plant in combination with the new austrian tunneling construction method, this article first analyzes the design of primary support system, and the key point of the analyses lies in the primary support technical treatment schemes of Gaoling mountain tunnel with the examples of tunnel collapse and primary support design alteration for bias voltage section, then the construction technology of the primary support system is summarized, and the safety of wall rock is analyzed as well with the measurement data. In the end, suggestions are put forward on the design and construction of primary support system for tunnels on the basis of practical working experience. (author)

  14. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  15. Certificate-Based Approach to Marketing Green Power and Constructing New Wind Energy Facilities: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Blank, E.; Bird, L.; Swezey, B.

    2002-05-01

    The availability of wind energy certificates in Pennsylvania's retail electricity market has made a critical difference in the economic feasibility of developing 140 MW of new wind energy projects in the region. Certificates offer important benefits to both green power suppliers and buyers by reducing transaction barriers and thus lowering the cost of renewable energy. Buyers also benefit through the increased flexibility offered by certificate products. The experience described in this paper offers important insights for selling green power certificates and achieving new wind energy development in other areas of the country.

  16. A certificate-based approach to marketing green power and constructing new wind energy facilities

    International Nuclear Information System (INIS)

    Blank, Eric; Bird, Lori; Swezey, Blair

    2003-01-01

    The availability of wind energy certificates in Pennsylvania's retail electricity market has made a critical difference in the economic feasibility of developing 140 MW of new wind energy projects in the region. Certificates offer important benefits to both green power suppliers and buyers by reducing transaction barriers. They thus lower the cost of renewable energy. Buyers also benefit through the increased flexibility offered by certificate products. The experience described in this paper offers important insights for selling green power certificates and achieving new wind energy development in other areas of the country. (Author)

  17. No halt to the construction of Muelheim-Kaerlich nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The grounds upon which the judgment of Koblenz Administrative Court (Verwaltungsgericht) of 1-8-1975 - 7 L 14/75 - was based are now available. In this decision, the action of the city of Neuwied for restitution of the action to set aside (motion to stay the immediate execution of) the First Partial License for the construction of the 1,200 MW nuclear power station at Muelheim-Kaerlich was dismissed. The costs of the administrative procedures, including the extra-judicial costs of the persons summoned to appear in court, are imposed upon the applicant. The value in litigation of the procedures following the motion to stay proceedings was fixed at 50,000 DM. The sometimes contradictory grounds of paragraph II are given in full wording and commented upon. (orig./AK) [de

  18. Agent-based power sharing scheme for active hybrid power sources

    Science.gov (United States)

    Jiang, Zhenhua

    The active hybridization technique provides an effective approach to combining the best properties of a heterogeneous set of power sources to achieve higher energy density, power density and fuel efficiency. Active hybrid power sources can be used to power hybrid electric vehicles with selected combinations of internal combustion engines, fuel cells, batteries, and/or supercapacitors. They can be deployed in all-electric ships to build a distributed electric power system. They can also be used in a bulk power system to construct an autonomous distributed energy system. An important aspect in designing an active hybrid power source is to find a suitable control strategy that can manage the active power sharing and take advantage of the inherent scalability and robustness benefits of the hybrid system. This paper presents an agent-based power sharing scheme for active hybrid power sources. To demonstrate the effectiveness of the proposed agent-based power sharing scheme, simulation studies are performed for a hybrid power source that can be used in a solar car as the main propulsion power module. Simulation results clearly indicate that the agent-based control framework is effective to coordinate the various energy sources and manage the power/voltage profiles.

  19. Design and construction of Minokawai hydro-power station; Minokawai suiryoku hatsudensho no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Kudo, A; Murakami, H; Hatano, K [Kansai Electric Power Co. Inc., Osaka (Japan)

    1994-09-05

    Minokawai power station is a plant with low head and large water quantity (output: 23.4MW) that utilizes Imawatari dam down the Kiso river. In constructing this power station, vertical drilling of about 33m in depth was executed in soft sedimentary rock area with uniaxial compression strength of 100kgf/cm{sup 2} or so. This report describes the geological condition in the drilling area and the outline of design and execution of corresponding landslide preventions. The drilling area mainly consists of tuff-containing sandstone and conglomerate with several weak layers such as lignite layers, and its stratum slopes gently from the mountain side to the river side. When the landslide preventions were designed, it was especially considered to secure stability of the drilling surface of earth filling as well as to control shear deformation along the lignite layer. Based on the two-dimensional elasto-plastic FEM analysis, structural design of landslide prevention walls and reinforcing methods using ground anchors and lock-bolts were determined. Construction works have been proceeded with as the ground behavior has been measured and controlled by setting many instruments such as insertion-type clinometers on the landslide preventions and the back ground. 2 refs., 18 figs., 5 tabs.

  20. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  1. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  2. Importance of the fuel and power resources of Siberia for a single interconnected grid in the USSR

    Energy Technology Data Exchange (ETDEWEB)

    Melentev, L

    1967-06-01

    Attention is drawn to the difficulties involved in single national power grid in USSR. The bulk of the population and most industry is in European Russia, but that the bulk of the fuel and power resources are in Siberia, and this major difficulty is aggravated by factors of climate and distance, making fuel transport or power transmission difficult and costly. This problem, hitherto presented as the challenge which global government planning alone could win, not only still persists, but is now threatening further expansion of the Soviet economy on the basis of cheap power supplies. For the eventual overall USSR power grid, emphasis is on the importance of dc interties, correct apportionment of capacity of the various possible types of power stations and location, and the importance of mathematical statistics in planned development.

  3. #QueenOfTheNation: multimodality and subversion in the construction of the power of the character Dilma Bolada

    Directory of Open Access Journals (Sweden)

    Leonel Andrade dos Santos

    2016-12-01

    Full Text Available This study aims to analyze how is the construction of the power of Dilma Bolada’s character  in her posts on Facebook.  For this, we supported us the on the theoretical proposal of Kress and van Leeuwen (2006 in terms of compositional metafunction and we took into account the ways that make the textual tessitura, whether verbal or visual. In addition, we articulated these assumptions on the concept of subversion postulated by Maingueneau (2004.  This research has qualitative interpretative nature on a corpus of three posts made on the official Dilma Bolada’s character on Facebook, published and collected between April and May 2014.  Among  various publications during this period, we listed those whose theme revolved around the Game of Thrones series. We emphasize that these posts refer to two distinct constructs of images: the Brazilian President Dilma Rousseff and the referred television series, creating, through these images, the character Dilma Bolada. We evidenced in these publications the appreciation of the power of Dilma Bolada achieved by the use of strong and vibrant colors of their clothing, the center position, or by being close to the ideal plan, in addition to subversion of the universe of the Game of Thrones series, which provided characteristics of strength and sovereignty to the character. The investigation allowed us to conclude that the traces of visual composition, enhanced by subverting the context of  the President Dilma Rousseff and the Game of Thrones series, contributed to the construction of the power of  Dilma Bolada’s image character.

  4. Biological/ecological investigations parallel to wind power plant construction and operation. Final report. Biologisch-oekologische Begleituntersuchungen zum Bau und Betrieb von Windkraftanlagen. Endbericht

    Energy Technology Data Exchange (ETDEWEB)

    Boettger, M; Clemens, T; Grote, G; Hartmann, G; Hartwig, E; Lammen, C; Vauk-Hentzelt, E

    1990-01-01

    In view of the fact that there is no validated knowledge in Germany on the environmental effects of wind power plant construction and operation, the Norddeutsche Naturschutzakademie was asked by the BMFT to carry out a study in this field. The following problems were investigated: General ecological assessment and ornithological assessment of sites; investigations parallel to plant construction and operation, ecological effects; long-term effects; proposal of landscape conservation measures in regions with wind power plants. The report presents the results of the investigation. (BWI).

  5. Seismic-safe conditions of blasting near pressure pipe-lines during power installation construction

    International Nuclear Information System (INIS)

    Smolij, N.I.; Nikitin, A.S.

    1980-01-01

    Seismic-safe conditions for performing drill-blasting operations in the vicinity of underground gas pipelines when constructing thermal- or nuclear power plants are discussed. It is shown that, for the determination of seismic-safe parameters, of drill-blasting operations, the maximum permissible level of seismic loads should be specified taking into account the mechanical properties of the pipeline.metal, structural parameters of the gas pipeline and the pressure of the medium transported. Besides, the seismic effect of the blast should be considered with regard to particular conditions of blasting and rock properties. The equations and diagrams used in the calculation are given

  6. Construction and cost experience regarding the 2nd pool house for spent fuel storage facility in the Atucha Power Station

    International Nuclear Information System (INIS)

    Barbosa, C.A.

    1980-01-01

    The Atucha I second pool house storage for spent fuel is designed as an extension of the Atucha I power station. The two are linked by civil structure, controlling circuits, electrical and compressed air and water supplies, low level wastes disposal, ventilation under pressure maintenance, and, most important, the ability to transfer spent and new fuel in both directions. Because the second pool house is, by location and design, an extension of the existing installation, and since there is no design departure, regarding storage and transfer of fuel from that of the original installation, the rules and regulations applied for its construction were the same as those valid for the Atucha I construction. The requirement not to exceed a four-year period for construction and commissioning was determined by the need to have storage room for the Atucha I fuel. Argentina will meet the 1982 target by having the installation available during the second half of 1981. The second pool house is a wet storage location with a capacity of 1000 tons metallic uranium. It was designed by the Kraftwerk Union of West Germany along the same lines as the 440-ton storage location originally built with the station. The Atomic Energy Commission of Argentina has managed the construction and participated in project and design stages. As in the original pool, the 6 m long assemblies are stacked in double tiers. The cost figures which are mentioned differ from previously released figures and are not the final ones. With civil construction almost finished and mechanical erection started, the present estimates should not differ by more than 10% from the final figures. The installation has an investment cost of 61 million dollars, (1980), and, depending on the amortization time span considered, a total yearly cost per kg of capacity of metallic uranium, ranging between 5.5 and 9.3 dollars per kg

  7. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    International Nuclear Information System (INIS)

    Kotthoff, K.; Huren, H.

    1986-01-01

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  8. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    Energy Technology Data Exchange (ETDEWEB)

    Kotthoff, K. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany); Huren, H. [Rheinisch-Westfaelisches Elektrizitaetswerk AG, Betriebsverwaltung Biblis, Biblis (Germany)

    1986-02-15

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  9. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  10. A qualitative model construction method of nuclear power plants for effective diagnostic knowledge generation

    International Nuclear Information System (INIS)

    Yoshikawa, Shinji; Endou, Akira; Kitamura, Yoshinobu; Sasajima, Munehiko; Ikeda, Mitsuru; Mizoguchi, Riichiro.

    1994-01-01

    This paper discusses a method to construct a qualitative model of a nuclear power plant, in order to generate effective diagnostic knowledge. The proposed method is to prepare deep knowledge to be provided to a knowledge compiler based upon qualitative reasoning (QR). Necessity of knowledge compilation for nuclear plant diagnosis will be explained first, and conventionally-experienced problems in qualitative reasoning and a proposed method to overcome this problem is shown next, then a sample procedure to build a qualitative nuclear plant model is demonstrated. (author)

  11. Ion irradiation studies of construction materials for high-power accelerators

    Science.gov (United States)

    Mustafin, E.; Seidl, T.; Plotnikov, A.; Strašík, I.; Pavlović, M.; Miglierini, M.; Stanćek, S.; Fertman, A.; Lanćok, A.

    The paper reviews the activities and reports the current results of GSI-INTAS projects that are dealing with investigations of construction materials for high-power accelerators and their components. Three types of materials have been investigated, namely metals (stainless steel and copper), metallic glasses (Nanoperm, Finemet and Vitrovac) and organic materials (polyimide insulators and glass fiber reinforced plastics/GFRP). The materials were irradiated by different ion beams with various fluencies and energies. The influence of radiation on selected physical properties of these materials has been investigated with the aid of gamma-ray spectroscopy, transmission Mössbauer spectroscopy (TMS), conversion electrons Mössbauer spectroscopy (CEMS), optical spectroscopy (IR and UV/VIS) and other analytical methods. Some experiments were accompanied with computer simulations by FLUKA, SHIELD and SRIM codes. Validity of the codes was verified by comparison of the simulation results with experiments. After the validation, the codes were used to complete the data that could not be obtained experimentally.

  12. The future of fission-electric power

    International Nuclear Information System (INIS)

    Morowski, J.V.

    1983-06-01

    Future worldwide electricity supply needs dictate the necessity of maintaining a sound capability for electricity and electric power generating facilities, including nuclear, as viable export commodities. A survey of fission-power plant types and the status of worldwide nuclear electric power illustrates the primary emphasis on LWR's and HWR's as two leading types in the export market. This survey examines the factors affecting the market prospects for the next five to fifteen years and provides a discussion on some possible improvements to current market circumstances. A comparative description is provided for some of the types of LWR and CANDU characteristics such as quantities, schedules, constructability factors, and equipment and system. Important factors in the selection process for future nuclear power plants are discussed. Some factors included are seismic design requirements; plant design description and possible site layout; plant protection, control and instrumentation; thermal cycle design and arrangement; and special construction and rigging requirements

  13. Design considerations and construction of an experimental prototype of concentrating solar power tower system in Saudi Arabia

    International Nuclear Information System (INIS)

    Abu-Hamdeh, Nidal H.; Alnefaie, Khaled A.

    2016-01-01

    Highlights: • Article is about designing and building a small scale prototype solar power tower system. • Calculations revealed that 10 heliostats are required to direct incident solar rays. • Design requirements showed that a solar tower of 7 m height should be used. • Storage tanks are cylindrical vessels with height of 1 m and a diameter of 1.5 m each. • The percentage error in the thermal power obtained from this system is about 5.3%. - Abstract: A prototype of a solar power tower system was designed and constructed to produce electricity from solar energy. This prototype of a solar power tower system was constructed and installed at King Abdulaziz University in Saudi Arabia where solar intensity is excessive. Heliostats were implemented to capture the solar rays during daylight. These mirrors are used to direct the solar energy to a solar receiver that is made of alloy steel so that thermal energy is conveyed to a thermal fluid inside the receiver. Based on a detailed selection procedure presented in this article, a final number of ten heliostats were chosen to direct the solar energy to the solar receiver. In addition; two motors were used to control the heliostat rotational and elevation movements. The thermal fluid is a molten salt mixture (which consists of 60% NaNO_3 and 40% KNO_3). Cold and hot storage tanks were manufactured from steel and they were insulated with calcium silicate from all sides. A one-meter high and one and a half-meter cylindrical vessel was adopted for each of the cold and hot tanks. In this article, a detailed design analysis of each component is presented. The thermal power transferred to the water in the heat exchanger as it is heated by the molten salt was measured and found to be 11.26 kW. The thermal power given by the molten salt in the heat exchanger was also measured and found to be 12.31 kW. The design thermal power was 13 kW. The percentage error in the thermal power obtained is about 5.3%.

  14. Nuclear plant construction and investment risk

    International Nuclear Information System (INIS)

    Studness, C.M.

    1984-01-01

    Escalated cost estimations, delays and cancellations in nuclear construction have caused a preoccupation with the risks of nuclear power plant construction that dominates utility stock investment, overshadowing increased earnings per share and recent growth in production. The issue will be resolved when increased power demand requires new construction, but the effect has so far been to erode the economic advantage of nuclear power and threaten the ability of utilities to get rate increases high enough to cover their costs. Projected delays and cost escalations and their effects must go into an economic appraisal of the investment risks

  15. Planting on the slope of Yangjiang nuclear power plant by spraying combined materials

    International Nuclear Information System (INIS)

    Li Ning

    2010-01-01

    During the development and construction of nuclear power projects, in order to prevent ecological degradation and soil erosion of slope hazards, taking practical measures in the works or plant is particularly important. through the main high slope green field application of Yangjiang nuclear power plant, introducing mixed vegetation spraying techniques and characteristics of the construction process, for similar projects it is also a good guide. (author)

  16. Quality control of concrete in construction of No.2 and No.5 plants in Kashiwazaki Kariwa Nuclear Power Station, Tokyo Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Yamashita, Toshio; Nukui, Yasushi; Nojiri, Takaharu.

    1990-01-01

    The construction site and its weather condition are outlined. In the Nuclear Power Station, No.1 plant and No.5 plant with 1100 MWe output each have been already in operation, and No.2 plant with 1100 MWe output is about to start the operation. In this report, the quality control of about 700,000 m 3 of concrete used for No.2 and No.5 plants construction from October, 1983 to November, 1989 is described. The features of the concrete used are shown. The facilities for producing the concrete, which were set up in the construction site, the mixing of the concrete and the quality control are reported. The system for carrying out the quality control of materials and concrete is shown with a flowchart. The material testing on cement, aggregate, water quality, fly ash and chemical additives was carried out. The slump, air quantity, temperature, strength and specific gravity of concrete were tested. (K.I.)

  17. Study of a simplified method of evaluating the economic maintenance importance of components in nuclear power plant system

    International Nuclear Information System (INIS)

    Aoki, Takayuki; Takagi, Toshiyuki; Kodama, Noriko

    2014-01-01

    Safety risk importance of components in nuclear power plants has been evaluated based on the probabilistic risk assessment and used for the decisions in various plant managements. But economic risk importance of the components has not been discussed very much. Therefore, this paper discusses risk importance of the components from the viewpoint of plant economic efficiency and proposes a simplified evaluation method of the economic risk importance (or economic maintenance importance). As a result of consideration, the followings were obtained. (1) A unit cost of power generation is selected as a performance indicator and can be related to a failure rate of components in nuclear power plant which is a result of maintenance. (2) The economic maintenance importance has to major factors, i.e. repair cost at component failure and production loss associated with plant outage due to component failure. (3) The developed method enables easy understanding of economic impacts of plant shutdown or power reduction due to component failures on the plane which adopts the repair cost in vertical axis and the production loss in horizontal axis. (author)

  18. Massive use of pulverized fuel ash in concrete for the construction of a U.K. power station

    International Nuclear Information System (INIS)

    Davies, D.R.; Kitchener, J.N.

    1996-01-01

    This paper describes the incorporation and benefits of pulverized fuel ash (PFA) in nearly 620,000 m 2 of concrete used in the construction of the UK's first commercial pressurized light water nuclear reactor power station, Sizewell B, Suffolk. Overall nearly 100,000 t of PFA, 1,300 t of sintered fly ash lightweight aggregate, and nearly 137,000 t of Ordinary Portland Cement (OPC) were used in the works. Generally in the construction of the main power station buildings, structural concrete with a characteristic strength of 45 N/mm 2 was placed and included fly ash as 40% of the cementitious component. Also, concrete with fly ash as 50% of the cementitious component was placed as mass fill. The program of research is reported, including sulfate resistance, heat of hydration,elastic properties, alkali-silica reaction, and long-term strength test results. Test and field results are presented and discussed. Strict quality assurance procedures were enforced and statistical summaries are offered to give an insight into the quality of control exercised. Test work and long-term results are also outlined

  19. Lithuanian requirements for ageing management of systems and components important to safety of nuclear power plant

    International Nuclear Information System (INIS)

    Ramanauskiene, A.

    2000-01-01

    In this paper the Lithuanian requirements for ageing management of systems and components important to safety of Ignalina nuclear power plant (two RBMK-1500 water-cooled graphite moderated channel-type power reactors) are presented

  20. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  1. Improvements in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    1990-01-01

    This paper outlines activities to minimize the amount of work at a construction site by employing installation method with large size blocks and shop-assembled units, improvement in facilities such as mechanization of welding and huge roof cover which enables work in all weather conditions, and administration systems using computer for the work activity control as well as quality and progress control for construction work. These improvements are only achieved when supported by related system improvements at the design and fabrication stage, and these improvements contributed a great deal to the quality assurance and the shorter construction period. (author)

  2. MPPT algorithm test on a photovoltaic emulating system constructed by a DC power supply and an indoor solar panel

    International Nuclear Information System (INIS)

    Zhou, Z.; Holland, P.M.; Igic, P.

    2014-01-01

    Highlights: • A novel PV emulator is constructed by using conventional solar panels with a DC power supply. • The proposed PV emulator is cost-effectiveness, relatively easy implementation. • The proposed PV emulator avoids the bandwidth problem associated with electronics PV emulators. • Indoor testing of MPPT algorithms and power converters avoids the dependency on solar irradiation. • The PV emulating system has been used for testing a P and O MPPT algorithm and a boost dc converter. - Abstract: In this paper a novel photovoltaic (PV) emulating scheme for testing maximum power point tracking (MPPT) algorithms and PV inverters has been proposed. It is constructed by the parallel connection of conventional solar panels with a DC power supply operating in current source mode. The advantages of the proposed scheme are cost-effectiveness, relatively easy implementation and indoor testing of MPPT algorithms and power converters avoiding weather and time of day dependency on solar irradiation levels. Furthermore, the proposed PV emulator avoids the bandwidth problem associated with the dc converter based PV emulating systems. Detailed circuit connection, parameters, electrical characteristics and mathematical model of the PV emulator are presented and discussed. Proposed PV emulating system has been used to test a boost DC/DC converter controlled by Perturb and Observe (P and O) MPPT algorithm. Test results confirmed the effectiveness of the proposed PV emulation system and all achieved results correspond well to the original designed values

  3. The status and future development of nuclear power in Japan

    International Nuclear Information System (INIS)

    Shoda, A.Y.

    1987-01-01

    As a result of its high dependence on imports in the energy supply sector, Japan has embarked on an extensive nuclear power program, which covers the whole nuclear fuel cycle and the construction of nuclear power plants. In 1985, 32 nuclear generating units with an aggregate power of 24.500 MW were in operation; this amounts to well over a quarter of the total generating capacity installed in Japan. Another ten units with an aggregate approx. 10,000 MW are under construction and six units with 6300 MW are being prepared for construction. After the completion of this phase of the program in 1995, the nuclear generating capacity is to be stepped up year by year by an aggregate 1500 to 2500 MW, for the time being. (orig.) [de

  4. Operational, design and microbial aspects related to power production with microbial fuel cells implemented in constructed wetlands.

    Science.gov (United States)

    Corbella, Clara; Guivernau, Miriam; Viñas, Marc; Puigagut, Jaume

    2015-11-01

    This work aimed at determining the amount of energy that can be harvested by implementing microbial fuel cells (MFC) in horizontal subsurface constructed wetlands (HSSF CWs) during the treatment of real domestic wastewater. To this aim, MFC were implemented in a pilot plant based on two HSSF CW, one fed with primary settled wastewater (Settler line) and the other fed with the effluent of a hydrolytic up-flow sludge blanket reactor (HUSB line). The eubacterial and archaeal community was profiled on wetland gravel, MFC electrodes and primary treated wastewater by means of 16S rRNA gene-based 454-pyrosequencing and qPCR of 16S rRNA and mcrA genes. Maximum current (219 mA/m(2)) and power (36 mW/m(2)) densities were obtained for the HUSB line. Power production pattern correlated well with water level fluctuations within the wetlands, whereas the type of primary treatment implemented had a significant impact on the diversity and relative abundance of eubacteria communities colonizing MFC. It is worth noticing the high predominance (13-16% of relative abundance) of one OTU belonging to Geobacter on active MFC of the HUSB line that was absent for the settler line MFC. Hence, MFC show promise for power production in constructed wetlands receiving the effluent of a HUSB reactor. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. Cost estimates for nuclear power in the UK

    International Nuclear Information System (INIS)

    Harris, Grant; Heptonstall, Phil; Gross, Robert; Handley, David

    2013-01-01

    Current UK Government support for nuclear power has in part been informed by cost estimates that suggest that electricity from new nuclear power stations will be competitive with alternative low carbon generation options. The evidence and analysis presented in this paper suggests that the capital cost estimates for nuclear power that are being used to inform these projections rely on costs escalating over the pre-construction and construction phase of the new build programme at a level significantly below those that have been experienced by past US and European programmes. This paper applies observed construction time and cost escalation rates to the published estimates of capital costs for new nuclear plant in the UK and calculates the potential impact on levelised cost per unit of electricity produced. The results suggest that levelised cost may turn out to be significantly higher than expected which in turn has important implications for policy, both in general terms of the potential costs to consumers and more specifically for negotiations around the level of policy support and contractual arrangements offered to individual projects through the proposed contract for difference strike price. -- Highlights: •Nuclear power projects costs can rise substantially during the construction period. •Pre-construction and construction time can be much longer than anticipated. •Adjusting estimates for observed experience increases levelised costs significantly. •Higher costs suggest that more policy support than envisaged may be required

  6. The role of nuclear power in the reassessment of Czechoslovakia's energy policy

    International Nuclear Information System (INIS)

    Cibula, M.

    1991-01-01

    The role of nuclear industry in an effective solution of Czechoslovakia's economic, energy and ecological problems is discussed. It is concluded that the impacts of slowing-down of the construction of nuclear power plants can only be overcome by extending the operation of the ecologically unfavorable coal-fired power plants; orientation either to the construction of natural gas-fired power plants with combined steam-gas cycles associated with the use of heat, or to electricity imports does not offer a fundamental solution to the above problem. (Z.M.). 5 refs

  7. Analysis of the financial task generated by the construction of a nuclear power plant in Mexico

    International Nuclear Information System (INIS)

    Alonso, G.; Ramirez, R.; Palacios, J.; Delfin, A.

    2011-11-01

    The construction of new nuclear reactors requires of a high investment making them intensive projects in capital and that require as minimum of 5 years for its construction. The financial task that represents for the electric company is of vital importance, since in the case of privates in other countries prevents them of entering in this type of projects if they do not have its Government support. In the case of Mexico, being an electric company integrated vertically can have financing to carry out this investment type. In this study is analyzed the construction viability of new nuclear reactors in Mexico based on the financial task that represents for the Electric Company its construction. (Author)

  8. 10 CFR 50.49 - Environmental qualification of electric equipment important to safety for nuclear power plants.

    Science.gov (United States)

    2010-01-01

    ... important to safety for nuclear power plants. 50.49 Section 50.49 Energy NUCLEAR REGULATORY COMMISSION... nuclear power plants. (a) Each holder of or an applicant for an operating license issued under this part... nuclear power plant for which the certifications required under § 50.82(a)(1) or § 52.110(a)(1) of this...

  9. The European Commission: nuclear power has an important role to play; Commission Europeenne: le nucleaire a un role important a jouer

    Energy Technology Data Exchange (ETDEWEB)

    Anon

    2008-11-15

    The European Commission (E.C.) thinks that nuclear power has an important role to play: first to reduce CO{sub 2} emissions and secondly to reinforce energy self-reliance of the member states. The decision to introduce nuclear power in their energy mix belongs to every state but the E.C. has also highlighted that if adequate investment are quickly made 2 thirds of the electricity produced in the European Union in 2010 could by from low-carbon-emitting sources. Today with 148 reactors operating in 15 member countries nuclear power contributes to 1 third of the electricity produced. Another issue that is looming is the security of electricity supplying. A study has shown that the security level is worsening (particularly in winter) because of the greater part of wind energy in the energy mix as wind energy is not necessarily available when energy demand is peaking. The E.C. has proposed a new directive drawing a common standard frame for nuclear safety requirements concerning design, site selection, maintenance, operation and decommissioning of nuclear facilities. Each member state will have the choice to implement stiffer regulations. The European Union must reduce its dependency on Russian gas by increasing its storing capacities, by easing gas exchanges between member states and by importing more liquefied natural gas. European member states will have to invert 1000*10{sup 9} euros in gas and electrical power infrastructures in the next 25 years. (A.C.)

  10. Nuclear power as a social problem

    International Nuclear Information System (INIS)

    Munch, E.

    1981-01-01

    The history of the origin of social opposition to construction and expansion of operating NPP in capitalist countries of Europe and USA is considered. The most important manifestations against NPP construction are indicated. On the basis of the analysis of results of public opinion inquest carried out in different countries it is concluded that the number of opponents to the development of nuclear power engineering in developed western countries does not constitute the majority of the population [ru

  11. Construction and start-up testing experience of Kashiwazakikariwa Nuclear Power Station Unit No.1

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Murakami, Hideaki

    1986-01-01

    In order to overcome the new location condition in Japan Sea coast, new techniques were developed and adopted to ensure the safety in construction and to shorten the construction period as far as possible. The commercial operation was started on September 18, 1985. This plant is a BWR plant of 1100 MWe output. The results of the improvement and standardization of BWRs and the measures for reliability improvement and radiation dose reduction were fully adopted in this plant. The site of the power station and the layout of the main facilities are explained. As the features of the location condition, the severe weather condition in winter such as snow, wind and lightning and high waves in the sea were considered. The rockbed for installing the foundation of the reactor building was deep, and the aseismatic design condition was made stricter, accordingly, the quantity of materials increased. A tent dome was developed to cover above the reactor containment vessel being assembled, a lightning forecast system was installed, and synchro-lift method was adopted for caisson breakwaters. The countermeasures to the deep rockbed and the measures to shorten the construction period were taken. The results of the trial operation are reported. (Kako, I.)

  12. Environmental feasibility study for deployment and construction of mobile gas turbine power plants in urbanized areas

    Directory of Open Access Journals (Sweden)

    Bryukhan Fedor

    2017-01-01

    Full Text Available In the view of current electrical shortage in some regions of Russia, mobile gas turbine power plants (MGTPP have become urgent in recent years. Usually they are used as back-up power sources to cover peak loads in power networks and to ensure uninterrupted power supply to consumers. This paper deals with environmental feasibility study for deployment and construction of the MGTPP in an urban setting. Technogehic factors of the MGTPP impact on the environment have been assessed and possibility of the MGTPP deployment at various sites in different regions of Russia has been identified. The necessity of using the technology of water injection into the gas turbine units combustion chamber to suppress nitrogen oxides in some cases is mentioned. Quantitative assessments of the MGTPP technogehic impact on the environment components have been performed using standard techniques. The calculations have revealed that the MGTPP specifications ensure the levels of technogehic impacts within the standard limits. The results have ensured preparation of pre-design and design documentation related to protection of the environment against the MGTPP complex technogehic impact.

  13. Finland: construction of the first geological storage of the world

    International Nuclear Information System (INIS)

    Garcia Neri, E.

    2015-01-01

    Finland has become the first country in the world granting a construction license for a store deep geological (AGP) for radioactive waste, as reported last November 12 Posiva, the agency management of these materials in the Baltic country. After more than 40 years of research, Posiva begin construction of this facility in Olkiluoto, which will house so end spent fuel generated in power stations Olkiluoto and Loviisa and could start operating in 2023. As noted Janne Mokka, president of Posiva, this pioneering project is not only important for Finland, but for everyone because it is the first AGP enters under construction in the world. (Author)

  14. Power station fly ash. A review of value-added utilization outside of the construction industry

    International Nuclear Information System (INIS)

    Iyer, R.S.; Scott, J.A.

    2001-01-01

    The disposal of fly ash from coal-fired power stations causes significant economic and environmental problems. A relatively small percentage of the material finds application as an ingredient in cement and other construction products, but the vast majority of material generated each year is held in ash dams or similar dumps. This unproductive use of land and the associated long-term financial burden of maintenance has led to realization that alternative uses for fly ash as a value-added product beyond incorporation in construction materials are needed. Utilization of fly ash in such areas as novel materials, waste management, recovery of metals and agriculture is reviewed in this article with the aim of looking at new areas that will expand the positive reuse of fly ash, thereby helping to reduce the environmental and economic impacts of disposal

  15. Planning and realization of river diversions for the construction of reservoirs and river power stations; Planung und Ausfuehrung von Flussumleitungen im Talsperren- und Flusskraftwerksbau

    Energy Technology Data Exchange (ETDEWEB)

    Patt, M

    1992-03-19

    River diversions are necessary measures in reservoir and river power station construction in order to be able to construct the planned buildings in dry building ground. These diversion measures are only temporary as only in the construction phase of the retaining works the flow is led through the site. As in the recent past large hydraulic engineering plants have reached new dimensions also river diversions have gained importance with regard to the flow to be controlled. With this work the author wants to contribute to an improvement in river diversion with regard to safety, economy and environmental compatibility. (orig.) [Deutsch] Flussumleitungen sind im Talsperren- und Flusskraftwerksbau notwendige Massnahmen, um die projektierten Bauwerke in trockenen Baugruben errichten zu koennen. Diese Umleitungsmassnahmen besitzen einen temporaeren Charakter, da mit ihrer Hilfe der Abfluss ausschliesslich in der Bauphase des Sperrprojekts durch die Baustelle gewaehrleistet wird. Da in juengster Vergangenheit die wasserbaulichen Grossanlagen in neue Dimensionen vorgestossen sind, haben auch die Flussumleitungen hinsichtlich der Abfluesse, die es zu beherrschen gilt, an Bedeutung gewonnen. Mit der vorliegenden Arbeit moechte ich einen Beitrag leisten zur Verbesserung von Flussumleitungen im Hinblick auf Sicherheit, Wirtschaftlichkeit und Umweltvertraeglichkeit. (orig.)

  16. Anchorage of equipment - requirements and verification methods with emphasis on equipment of existing and constructed VVER-type nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    Criteria and verification methods which are recommended for use in the capacity evaluation of anchorage of safety-related equipment at WWER-type nuclear power plants are presented. Developed in compliance with the relevant basic standards documents specifically for anchorage of WWER-type equipment components, the criteria and methods cover different types of anchor bolts and other anchorage elements which are typical of existing, constructed, or reconstructed WWER-type nuclear power plants

  17. Construction of scales to measure leadership behavior at nuclear power plants. 2

    Energy Technology Data Exchange (ETDEWEB)

    Misumi, Jyuji; Yamada, Akira [Institute of Nuclear Safety System Inc., Kyoto (Japan); Shinohara, Shinobu [and others

    1994-05-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors` field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors` leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace `morale`-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  18. Tentative to use wastes from thermal power plants for construction building materials

    Science.gov (United States)

    Bui, Quoc-Bao; Phan, To-Anh-Vu; Tran, Minh-Tung; Le, Duc-Hien

    2018-04-01

    Thermal power plants (TPP) generates wastes (bottom and fly ashes) which become a serious environmental problem in Vietnam. Indeed, although in several countries fly ash can be used for cement industry, fly ash from actual TPP in Vietnam does not have enough good quality for cement production, because the fly ash treatment phase has not yet included in the generations of existing Vietnamese TPP. That is why bottom ash and fly ash purely become wastes and their evacuation is an urgent demand of the society. This paper presents an investigation using fly and bottom ashes in the manufacturing of construction materials. The main aims of this study is to reduce environmental impacts of fly and bottom ashes, and to test another non-conventional binder to replace cement in the manufacture of unburnt bricks. Several proportions of fly ash, bottom ash, cement, gravel, sand and water were tested to manufacture concretes. Then, geopolymer was prepared from the fly ash and an activator. Specimens were tested in uniaxial compressions. Results showed that the cement concrete tested had the compressive strengths which could be used for low rise constructions and the material using geopolymer could be used for non-load-bearing materials (unburnt bricks).

  19. Construction of scales to measure leadership behavior at nuclear power plants. 2

    International Nuclear Information System (INIS)

    Misumi, Jyuji; Yamada, Akira; Shinohara, Shinobu

    1994-01-01

    We tried to construct the PM leadership behavior measuring scales at nuclear power plants. In our factor analysis of leadership types of shift supervisors, maintenance and repair subsection chiefs and sub contractors' field leaders, three factors respectively were found. In the leadership scales for shift supervisors, the first factor was named the factor of group maintenance, the second factor was named the factor of directive-order for goal achievement and the third factor was named the factor of specialty for goal achievement. For maintenance and repair subsection chiefs, the first factor was named the factor of directive-order for goal achievement, and second factor was named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for goal achievement. For subcontractors' leaders, the first factor was named the factor of directive-specialty for goal achievement, the second factor named the factor of group maintenance and the third factor was named the factor of rigidity-pressure for achievement. We constructed PM leadership measuring scales for each advisory position and verified its validity by using workplace 'morale'-(satisfaction, etc.) as a subordinate variable. Also, in regard to the distribution of scales, we verified the validity of distance scales by examining it by Quantification III. (author)

  20. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  1. Quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants

    International Nuclear Information System (INIS)

    1975-04-01

    This guide describes a method acceptable to the NRC staff for complying with the Commission's regulations with regard to quality assurance requirements for installation, inspection, and testing of structural concrete and structural steel during the construction phase of nuclear power plants. This guide applies to all types of nuclear power plants. (U.S.)

  2. Nuclear power perspective in China

    International Nuclear Information System (INIS)

    Liu Xinrong; Xu Changhua

    2003-01-01

    China started developing nuclear technology for power generation in the 1970s. A substantial step toward building nuclear power plants was taken as the beginning of 1980 s. The successful constructions and operations of Qinshan - 1 NPP, which was an indigenous PWR design with the capacity of 300 MWe, and Daya Bay NPP, which was an imported twin-unit PWR plant from France with the capacity of 900 MWe each, give impetus to further Chinese nuclear power development. Now there are 8 units with the total capacity of 6100 MWe in operation and 3 units with the total capacity of 2600 MWe under construction. For the sake of meeting the increasing demand for electricity for the sustainable economic development, changing the energy mix and mitigating the environment pollution impact caused by fossil fuel power plant, a near and middle term electrical power development program will be established soon. It is preliminarily predicted that the total power installation capacity will be 750-800GWe by the year 2020. The nuclear share will account for at least 4.0-4.5 percent of the total. This situation leaves the Chinese nuclear power industry with a good opportunity but also a great challenge. A practical nuclear power program and a consistent policy and strategy for future nuclear power development will be carefully prepared and implemented so as to maintain the nuclear power industry to be healthfully developed. (author)

  3. Modularization in construction processes New Nuclear Power Plants

    International Nuclear Information System (INIS)

    Martinez, I.; Cobos, A.; Herrera Ropero, D.

    2012-01-01

    The aim of this work is that it has the capacity and expertise to analyze the suitability of modular technology design and construction compared to conventional nuclear plants. It will define the criteria for selecting the areas of modularity and the impact on design and its interfaces with engineering, supply, including logistics and construction.

  4. Advanced plant engineering and construction of Japanese ABWRs

    International Nuclear Information System (INIS)

    Gotoh, N.; Sumikawa, J.; Yoshida, N.; Yoshida, M.

    1998-01-01

    Remarkable improvement has been made in recent nuclear power plant design and construction in Japan. These many improved engineering technologies has been made a good use in the lately commercial operated two world's first 1,356MWe ABW's (Advanced Boiling Water Reactors), and made a great contribution to the smooth progress and the completion of a highly reliable plant construction. Especially, two engineering technologies, (1), three-dimensional computer aided design system through engineering data-base, and (2), large scale modularising construction method, have been successfully applied as the integrated engineering technologies of the plant construction. And two integrated reviews, 'integrated design review, confirmation of new and changed design and prevention of failure recurrence' in the design stage, and 'constructing plant review' at the site, have been widely and systematically conducted as a link in the chain of steady reliability improvement activities. These advanced and/or continuous and steady technologies are one of most important factors for high reliability through the entire lifetime of a nuclear plant, including planning, design, construction, operation and maintenance stages. (author)

  5. General aspects of slip from technique in the construction of containment structure of the Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Tilak, M.M.

    1975-01-01

    The paper describes one of the modern techniques of construction methods, i.e. use of slip form technique. Important features in adopting the above technique and its impact on construction aspects and design parameters in respect of containment structure are briefly discussed. (author)

  6. The effect of economic growth, oil prices, and the benefits of reactor standardization: Duration of nuclear power plant construction revisited

    International Nuclear Information System (INIS)

    Csereklyei, Zsuzsanna; Thurner, Paul W.; Bauer, Alexander; Küchenhoff, Helmut

    2016-01-01

    The profitability of nuclear power plant investment is largely determined by the construction duration, which directly impacts discounted cash flows, debt and interest payments, as well as variable costs, such as labor. This paper analyzes the key drivers of construction duration using survival models. We focus especially on the strategic expectation formation of private and public utilities engaging in such highly risky megaprojects. Using a balanced dataset of explanatory variables and the IAEA/PRIS dataset of reactor construction starts between 1950 and 2013 we find that the expectation of rising oil prices and higher economic growth, along with the higher per capita GDP of a country tend to reduce the time needed to grid connection. We also identify the reactor models with the fastest construction duration. - Highlights: • We find that higher future economic growth speeds up nuclear reactor construction. • Higher national capacity (measured by income per capita) results in faster projects. • Higher oil prices during construction lead to faster construction times. • Reactor standardization may result in faster building times.

  7. Potential in stochastic differential equations: novel construction

    International Nuclear Information System (INIS)

    Ao, P

    2004-01-01

    There is a whole range of emergent phenomena in a complex network such as robustness, adaptiveness, multiple-equilibrium, hysteresis, oscillation and feedback. Those non-equilibrium behaviours can often be described by a set of stochastic differential equations. One persistent important question is the existence of a potential function. Here we demonstrate that a dynamical structure built into stochastic differential equation allows us to construct such a global optimization potential function. We present an explicit construction procedure to obtain the potential and relevant quantities. In the procedure no reference to the Fokker-Planck equation is needed. The availability of the potential suggests that powerful statistical mechanics tools can be used in nonequilibrium situations. (letter to the editor)

  8. Needs study of polymer materials concrete constructions; Behovsstudie av polymera material i betongkonstruktioner

    Energy Technology Data Exchange (ETDEWEB)

    Blomfeldt, Thomas; Bergsjoe, Petter

    2013-02-15

    Polymeric materials are frequently used in concrete constructions at hydro and nuclear power facilities. They are most commonly used as expansion joints, seals, lead-thought's, coatings and as additives in cement or mortar. Polymeric materials in concrete constructions are difficult to evaluate, since they are often located within the concrete construction. In some cases the materials have been in place for over 30 years. In addition, these materials are also used to a great extent e.g. as protective coating on all concrete in a nuclear power plant or as several kilometres of joints. Replacing these materials is difficult, time consuming and very costly. That is why it is of great importance to evaluate their actual status and life-time expectancy with the largest possible precision. This report summarises the research needs in nuclear and hydro power regarding polymers in concrete constructions. During the project information has been gathered through inspections, interviews and surveys, to obtain the clearest possible picture of which polymeric components that have a need of in-depth research. In this project the nuclear power plants Oskarshamn (O1, O2 and O3), Forsmark (F2) and Ringhals (R1, R2 and R3) were visited. In the field of hydro power the concrete laboratory of Vattenfall R and D in Aalvkarleby and the hydro power plants of Aalvkarleby and Olidan were visited. The studies indicate that there are different needs for hydro and nuclear power. The survey showed that hydro-power facilities have a greater interest in joints. The nuclear power plants are more interested in components that are related to either the plant's security or if the component could lead to high future maintenance costs.

  9. Fast reactors in nuclear power

    Energy Technology Data Exchange (ETDEWEB)

    Kazachkovskii, O

    1981-02-01

    The possible applications are discussed of fast reactor nuclear power plants. Basic differences are explained in fast and thermal reactors, mainly with a view to nuclear fuel utilization. Discussed in more detail are the problems of nuclear fuel reproduction and the nost important technical problems of fast reactors. Flow charts are shown of heat transfer for fast reactors BN-350 (loop design) and BN-600 (integral coolant circuit design). Main specifications are given for demonstration and power fast reactors in operation, under construction and in project-stage.

  10. Energy system, electricity market and economic studies on increasing nuclear power capacity

    International Nuclear Information System (INIS)

    Forsstrom, J.; Pursiheimo, E.; Kekkonen, V.; Honkatukia, J.

    2010-04-01

    Objective of this research project is to examine effects of addition of nuclear capacity from three different angles by using energy system, electricity market and economic analysis. In each area the analysis is based on computational methods. Finland is a member of Nordic electricity market which is further connected to networks of Continental Europe and Russia. Due to the foreign connections Finland has been able to import inexpensive electricity from its neighboring countries and this state is expected to continue. Addition of nuclear capacity lowers electricity import demand, affects level of electricity price decreasingly and decreases shortfall of installed production capacity. Substantial additions of nuclear power capacity and generous import supply have disadvantageous effect on profitability of combined heat and power production. The development of import possibilities depends on progression of difficult-to-estimate balance between electricity consumption and production in the neighboring countries. Investments on nuclear power increase national product during the construction phase. Growth of employment is also rather significant, especially during the construction phase. In the long term permanent jobs will be created too. Increase of employment is held back by increasing real wages, but it is though evident that consumer purchasing power is improved due to these nuclear power developments. (orig.)

  11. Construction and start-up of a 250 kW natural gas fueled MCFC demonstration power plant

    Energy Technology Data Exchange (ETDEWEB)

    Figueroa, R.A.; Carter, J.; Rivera, R.; Otahal, J. [San Diego Gas & Electric, CA (United States)] [and others

    1996-12-31

    San Diego Gas & Electric (SDG&E) is participating with M-C Power in the development and commercialization program of their internally manifolded heat exchanger (IMHEX{reg_sign}) carbonate fuel cell technology. Development of the IMHEX technology base on the UNOCAL test facility resulted in the demonstration of a 250 kW thermally integrated power plant located at the Naval Air Station at Miramar, California. The members of the commercialization team lead by M-C Power (MCP) include Bechtel Corporation, Stewart & Stevenson Services, Inc., and Ishikawajima-Harima Heavy Industries (IHI). MCP produced the fuel cell stack, Bechtel was responsible for the process engineering including the control system, Stewart & Stevenson was responsible for packaging the process equipment in a skid (pumps, desulfurizer, gas heater, turbo, heat exchanger and stem generator), IHI produced a compact flat plate catalytic reformer operating on natural gas, and SDG&E assumed responsibility for plant construction, start-up and operation of the plant.

  12. Works of shifting discharge facilities in construction for adding No.3 and No.4 plants to Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Matsuoka, Gen-ichi; Yoshida, Atsumu.

    1989-01-01

    At present in Oi Power Station, No.1 and No.2 plants of 1175 MWe output each are in operation, but in order to stabilize electric power supply for a long period, Kansai Electric Power Co., Inc. earnestly advances the construction works for adding No.3 and No.4 plants of each 1180 MWe output PWR. No.3 plant is expected to begin the operation in October, 1991, and No.4 plant in August, 1992. The works for creating the site were started in July, 1985, and the flat land of about 60,000 m 2 and the reclaimed land of about 80,000 m 2 were prepared. Subsequently, the main construction works were started in May, 1987, and the rate of general progress was 21 % in No.3 plant and 2 % in No.4 plant as of the end of October, 1988. Due to the addition of No.3 and No.4 plants, the quantity of condenser cooling water discharge increases to 318 m 3 /s from 150 m 3 /s at present, therefore, the bank having discharge holes is shifted from the present position about 100 m toward sea. As to the problems, the shifting works in flowing water, the method of shifting, the examination on lifting caissons and culverts, the trial construction of chemical anchors and so on were investigated. The execution of the shifting works is reported. (K.I.)

  13. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  14. Domestic use of overseas renewable energy -Potential as power generating fuel

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Tomofumi; Murata, Kenji; Kamiya, Shoji; Ota, Ken-ichiro; Sakata, Ko; Fukuda, Kenzo; Ishimoto, Yuki

    2010-09-15

    For Japan, it will be very important in the future to establish a social system that can consistently import or produce a set amount of resource supplies without green house gas emissions. In this study, we developed a concept for a global hydrogen energy system using wind power generation as a hydrogen source, investigated its economic efficiency, compared it with power generating fuels used at existing thermal power plants, and examined the feasibility of the global hydrogen energy system. As a result, it would be more effective to decommission existing oil-fired thermal power plants and construct new hydrogen turbine plants.

  15. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  16. The social and economic impact created by construction of a nuclear power station: the part played by local companies

    International Nuclear Information System (INIS)

    Rongere, H.

    1983-01-01

    The president of the Sedan Chamber of Commerce and Industry and managing director of a public works company indicates how local and regional firms involved in the construction of the Chooz B power plant in the Ardennes organized themselves to cater for the requirements of the EDF. The measures taken by these firms to adapt themselves to the demanding and complex nuclear power market are indicated and further the repercussions of the on site work on employment levels and business activity are indicated [fr

  17. Evaluation of residual life of material of power plant construction elements after long-term operation

    International Nuclear Information System (INIS)

    Osasyuk, V.V.

    1989-01-01

    Existing methods are analyzed for estimation of residual resource of elements of constructions, working in creep conditions. A suggested and experimentally verified new method of residual durability forecasting is described permitting the value of the supplementary resource to be specified according to the real state of the material after preoperation. Evaluation results are given for residual life of steam lines received by different methods and advantages of the technique proposed are shown. Reliability of the new technique is confirmed by steam line operation at thermal power plants

  18. Development of a power-assisted lifting device for construction and periodic inspection

    International Nuclear Information System (INIS)

    Hayatsu, M.; Yamada, M.; Takasu, H.; Tagawa, Y.; Kajiwara, K.

    2001-01-01

    This study focuses on the control system design and control performance of a power-assisted lifting device. The device consists of several electric chain-blocks, each controlled by force sensors and a CPU. The mechanism is as follows: (1) Force sensors detect any chain tension changes (by human force), (2) The CPU calculates the required output, (3) Electric chain-blocks move the object in the intended direction. The feature of this device is that it does not require any information related to the suspension points of the electric chain-blocks. The controller was designed using the H method, which considers disturbances and aims to provide robust stability under the operation conditions of construction verified through experiments using a 700 kg steel dummy mass (control object) suspended by four electric chain-blocks. In the experiments, the controller, which was designed using the H method, was compared to the PI controller method, and the effectiveness of the H controller was proven. A control object could be moved, translated, and rotated by human force (of less than 10 kg). Positioning performance errors were suppressed to less than 0.5 mm, and operation time was reduced by about 50%. This device will improve working efficiency and rationalize lifting operations in nuclear power plants. (author)

  19. Development of a power-assisted lifting device for construction and periodic inspection

    Energy Technology Data Exchange (ETDEWEB)

    Hayatsu, M.; Yamada, M.; Takasu, H. [Hitachi Plant Engineering and Construction, Chiba-ken (Japan); Tagawa, Y. [Tokyo Univ. of Agriculture and Technology (Japan); Kajiwara, K. [National Research Institute for Earth Science and Disaster Prevention, Tokyo (Japan)

    2001-07-01

    This study focuses on the control system design and control performance of a power-assisted lifting device. The device consists of several electric chain-blocks, each controlled by force sensors and a CPU. The mechanism is as follows: (1) Force sensors detect any chain tension changes (by human force), (2) The CPU calculates the required output, (3) Electric chain-blocks move the object in the intended direction. The feature of this device is that it does not require any information related to the suspension points of the electric chain-blocks. The controller was designed using the H method, which considers disturbances and aims to provide robust stability under the operation conditions of construction verified through experiments using a 700 kg steel dummy mass (control object) suspended by four electric chain-blocks. In the experiments, the controller, which was designed using the H method, was compared to the PI controller method, and the effectiveness of the H controller was proven. A control object could be moved, translated, and rotated by human force (of less than 10 kg). Positioning performance errors were suppressed to less than 0.5 mm, and operation time was reduced by about 50%. This device will improve working efficiency and rationalize lifting operations in nuclear power plants. (author)

  20. Importance of foreign investors for Russian power industry in prospect of energy revolution

    Directory of Open Access Journals (Sweden)

    Yaroslava N. Zubkova

    2017-01-01

    Full Text Available The article discusses current state of Russian electric power industry and the main problems of its development in the future of global energy revolution, which will lead to a significant increase in share of renewable energy in global production and consumption of energy and use of industrial energy storage, and will make it possible to change the structure of the industry and significantly reduce electricity prices. Traditional energy generation displacement by renewables associated with emergence of new, more cost effective technologies. Producers of “disruptive technologies” receive advantages over importers of innovations, which are especially noticeable during the formation of the new technological wave. Considering possibilities of effective development of Russian power industry, it is important to take into account the realities, including high level of depreciation of equipment, lack of capital and technologies. Currently, in the field of technology in the power industry innovative economies of Japan, USA, UK, Canada, as well as dynamically developing economy of China are leading. The high level of patent activity in these countries is caused by presence of infrastructure which promotes the commercialization of new technologies and free access to investment capital. In Russia technological exports in power sector occurs mainly due to foreign projects of Rosatom. Operation of foreign-made equipment which accounts for a significant proportion of fixed assets and problems with the development and introduction of competitive technologies are complicated by the lack of investment in domestic market. For maintenance of imported equipment Russian companies have to buy spare parts abroad and to enter into service contracts with foreign suppliers. High depreciation of fixed assets also determines the need for new investment inflows into the sector. Thus the existing dependence on foreign investors is supposed to increase. In the short term

  1. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  2. Construction time of PWRs

    Energy Technology Data Exchange (ETDEWEB)

    Carajilescov, Pedro; Moreira, Joao M.L., E-mail: pedro.carajilescov@ufabc.edu.b, E-mail: joao.moreira@ufabc.edu.b [Universidade Federal do ABC (UFABC), Santo Andre, SP (Brazil). Center of Engineering, Modeling and Applied Social Sciences

    2011-07-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  3. Construction time of PWRs

    International Nuclear Information System (INIS)

    Carajilescov, Pedro; Moreira, Joao M.L.

    2011-01-01

    The cost of electricity generated by nuclear power is greatly affected by the capital cost, which is dependent on the construction time of the plant. This work analyses the construction time of PWRs in several countries with different market structure and licensing experience. Countries which succeeded to establish a more collaborative environment among utilities, constructors, regulators, and energy planners through effective partnerships were able to build PWRs in shorter times. The construction time in Germany, France and Russia was around 80 months and in Japan, about 60 months. The envelope of 95% of the cases includes a range between 50 and 250 months of construction time. The evaluations show that construction time of PWRs has been longer for countries that did not hold the technology to build their own reactors, and depended on contracts with foreign suppliers. The nominal power of the reactors was considered a measure of plant size, technology complexity and standardization. Countries with standardized reactor designs (France, Japan and Russia) were able to build plants in shorter times. (author)

  4. Optimum operation of a small power production facility

    Energy Technology Data Exchange (ETDEWEB)

    Capehart, B.L.; Mahoney, J.F.; Sivazlian, B.D.

    1983-09-01

    To help reduce the U.S.A.'s dependence on imported oil for electrical power generation, the 1978 National Energy Act established regulations to promote construction and operation of cogeneration and small power production facilities. Many of these facilities are presently under construction, with a great number planned. This paper examines the operation of a small power production facility with on-site generation and storage, on-site use, and connection to an electric utility grid system for the purpose of both selling excess power and buying power. It is assumed that the buying and selling price of electricity varies frequently during the day and that the relevant price and demand data may be accurately projected into the near future. With this system description, a mathematical model is formulated and solved by linear programming to obtain a series of periodic buy and sell decisions so as to maximize the profit from operating the small power production facility. Results are presented to illustrate the methodology for determining potential profits.

  5. Air pollution and international law: a subject important to nuclear power

    International Nuclear Information System (INIS)

    Rose, D.J.

    1985-01-01

    An increasingly important advantage of nuclear power is its minimal air pollution, in particular the absence of combustion products such as acid rain and carbon dioxide. Developing a consensus about acceptable limits of such pollutants is a slow process that culminates in domestic an international agreements. Therefore, the pace of adoption of new technologies, nuclear power included, is often controlled by the level and intensity of debate, rather than by the technology alone. The state of understanding and consensus about local and long-range transboundary air pollution is therefore germane to the nuclear sector. Progress over the past several decades, mainly between the United States and Canada and within Europe, in developing a more comprehensive and effective international consensus, both informal and formal, is reviewed. There appears to be a trend toward more effective international participation in seeking a less-polluting world, albeit it is punctuated at times by unconcern

  6. Practical experience and problems in the inspection work during construction of nuclear power plants

    International Nuclear Information System (INIS)

    Jansson, E.

    1977-01-01

    Some problems in organizing the regulatory staff in relation to a growing nuclear program are mentioned. Some experiences and problems from the inspection activities during the construction phase are given. Quality assurance and the extent and importance of control and inspection by use of a ''third party'' system is discussed. (author)

  7. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  8. Final environmental statement related to construction of Skagit Nuclear Power Project Units 1 and 2: (Docket Nos. 50-522 and 50-523)

    International Nuclear Information System (INIS)

    1975-05-01

    The proposed action is the issuance of construction permits to the Pudget Sound Power and Light Company, Pacific Power and Light Company, Washington Water Power Company and the Washington Public Power Supply System, for the construction of Skagit Nuclear Power Projects Units 1 and 2 (Docket Nos. 50-522 and 50-523) in Skagit County, Washington (about 64 miles north of Seattle and 6 miles ENE of Sedro Woolley). These units are scheduled for commercial service in 1982 and 1985, respectively. Each unit will employ a boiling-water nuclear reactor with a maximum expected thermal power level of 4100 MWt, which is considered in the assessments contained in this statement. At the 3800 MWt power level initially to be licensed, the net electrical capacity of each unit will be 1288 MWe. The exhaust steam from the turbine-generators will be cooled in condensers which will utilize one hyperbolic-type natural-draft cooling tower per unit to dissipate heat to the atmosphere. Water (106 cfs max.) for the cooling tower makeup (82.4 cfs) and other plant uses will be withdrawn from the Skagit River through Ranney Collectors embedded in the north bank of the river and pumped to the plant through a pipeline about 35,000 ft. long. Cooling tower blowdown (7 cfs max.) from the project and dilution water (20 cfs max.) will flow through a pipeline back to the river where it will be discharged through a diffuser

  9. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  10. Security attack detection algorithm for electric power gis system based on mobile application

    Science.gov (United States)

    Zhou, Chao; Feng, Renjun; Wang, Liming; Huang, Wei; Guo, Yajuan

    2017-05-01

    Electric power GIS is one of the key information technologies to satisfy the power grid construction in China, and widely used in power grid construction planning, weather, and power distribution management. The introduction of electric power GIS based on mobile applications is an effective extension of the geographic information system that has been widely used in the electric power industry. It provides reliable, cheap and sustainable power service for the country. The accurate state estimation is the important conditions to maintain the normal operation of the electric power GIS. Recent research has shown that attackers can inject the complex false data into the power system. The injection attack of this new type of false data (load integrity attack LIA) can successfully bypass the routine detection to achieve the purpose of attack, so that the control center will make a series of wrong decision. Eventually, leading to uneven distribution of power in the grid. In order to ensure the safety of the electric power GIS system based on mobile application, it is very important to analyze the attack mechanism and propose a new type of attack, and to study the corresponding detection method and prevention strategy in the environment of electric power GIS system based on mobile application.

  11. Study on layout and construction concept of DMS (modular simplified medium small reactor)

    International Nuclear Information System (INIS)

    Shizuka Hirako; Yuusuke Shimizu; Shigeru Yokouchi; Yoshinori Iimura; Yuuji Yasuda; Kumiaki Moriya; Takahiko Hida

    2005-01-01

    Nuclear power is expected to become the main source of electric power generation in Japan for reasons of energy security and prevention of CO 2 emissions. In addition, the recent slowdown of electric power demand and the liberalization of the electric power market are accelerating medium and small sized reactor development. Under these circumstances, DMS's (modular simplified and medium small reactors) have been developed as 400 MWe class LWR's supported by the Japan Atomic Power Company. In the development of medium and small sized reactors, the most important point is how to overcome the scale demerits. To this end, we have pursued not only the simplification of systems and equipment but also the standardization of layout and construction. The main technical feature of DMS's is the adoption of a natural circulation reactor with short length fuel. Short length fuel enables the reduction of RPV height as well as construction volume of the PCV and building volume. A natural circulation reactor has considerable rationalizing effects such as the elimination of re-circulation pumps and their drive power source. By applying simplified systems and equipment, a rationalized layout and construction method are adopted. To improve the constructability by means of modular construction methods, steel containment is applied. The PCV size is reduced to 17 m in diameter and 24 m in height by applying a dish-shaped drywell and eccentric RPV arrangement. By applying a compact PCV and concentrated equipment arrangement in building, it can be confirmed that the ratio of building volume per unit power is equivalent to that of existing large sized ABWRs. Furthermore, a steel plate reinforced concrete structure (SC structure) is applied to the building layout. The application of the compact PCV (steel containment) and the SC structure makes it easier to apply a large-scale module, such as an integrated steel containment and SC structure module, and an integrated multi-layer BM (building

  12. Turn over management and optimization of Shangdong nuclear power plant

    International Nuclear Information System (INIS)

    Zheng Tong

    2014-01-01

    After the equipments' installation is completed, the system will carry out commissioning tests. After commissioning work is completed, the system will be transferred to temporary operation. The plant buildings and structures will be transferred to operation for management and maintenance after civil work. The turn over work is an important part of the transfer from construction to operation. The article describes the significance of the nuclear power plant turn over work, turn over organization and management mode, the workflow of system turn over from construction to commissioning (TOP), turn over form commissioning to operation (TOTO), house hand over (HHO), building hand over (BHO) of Shandong Haiyang nuclear power plant, and analyze the current lack and future improvements of turn over work. Shandong Haiyang nuclear power plant will usher in the peak period of turn over work in 2013, fully aware of the importance of the turn over work, will play a key role in the long-term stable operation of the unit. (author)

  13. French lessons in nuclear power

    International Nuclear Information System (INIS)

    Valenti, M.

    1991-01-01

    In stark contrast to the American atomic power experience is that of the French. Even the disaster at Chernobyl in 1986, which chilled nuclear programs throughout Western Europe, did not slow the pace of the nuclear program of the state-owned Electricite de France (EDF), based in Paris. Another five units are under construction and are scheduled to be connected to the French national power grid before the end of 1993. In 1989, the EDF's 58 nuclear reactors supplied 73 percent of French electrical needs, a higher percentage than any other country. In the United States, for example, only about 18 percent of electrical power is derived from the atom. Underpinning the success of nuclear energy in France is its use of standardized plant design and technology. This has been an imperative for the French nuclear power industry since 1974, when an intensive program of nuclear power plant construction began. It was then, in the aftermath of the first oil embargo, that the French government decided to reduce its dependence on imported oil by substituting atomic power sources for hydrocarbons. Other pillars supporting French nuclear success include retrofitting older plants with technological or design advances, intensive training of personnel, using robotic and computer aids to reduce downtime, controlling the entire nuclear fuel cycle, and maintaining a comprehensive public information effort about the nuclear program

  14. Energy analysis of nuclear power plants and their fuel cycle

    International Nuclear Information System (INIS)

    Held, C.; Moraw, G.; Schneeberger, M.; Szeless, A.

    1977-01-01

    Energy analysis has become an increasingly feasible and practical additional method for evaluating the engineering, economic and environmental aspects of power producing systems. Energy analysis compares total direct and indirect energy investment into construction and operation of power plants with their lifetime energy output. Statically we have applied this method to nuclear power producing sytems and their fuel cycles. Results were adapted to countries with various levels of industrialization and resources. With dynamic energy analysis different scenarios have been investigated. For comparison purposes fossil fueled and solar power plants have also been analyzed. By static evaluation it has been shown that for all types of power plants the energy investment for construction is shortly after plant startup being repaid by energy output. Static analyses of nuclear and fossil fuels have indicated values of fuel concentrations below which more energy is required for their utilization than can be obtained from the plants they fuel. In a further step these global results were specifically modified to the economic situations of countries with various levels of industrialization. Also the influence of energy imports upon energy analysis has been discussed. By dynamic energy analyses the cumulative energy requirements for specific power plant construction programs have been compared with their total energy output. Investigations of this sort are extremely valuable not only for economic reasons but especially for their usefulness in showing the advantages and disadvantages of a specific power program with respect to its alternatives. Naturally the impact of these investigations on the fuel requirements is of importance especially because of the today so often cited ''valuable cumulated fossil fuel savings''

  15. Recent achievements in regulating nuclear power activities in taiwan

    International Nuclear Information System (INIS)

    Ouyang, M.S.

    2006-01-01

    Full text: The energy resources in Taiwan are very scarce with more than 98% of the fuel sources imported from foreign countries. The nuclear power became essential because of its stability and economy in price. There are six operating nuclear power units in Taiwan, and two more advanced boiling water reactor units under construction. As the country's nuclear power still plays an important role, the Atomic Energy Council (AEC) devotes its great efforts working on reactor safety regulation, radiation protection, nuclear security, nuclear emergency preparedness, nuclear waste management and environmental monitoring. Recent achievements of AEC on the above mentioned topics will be covered in this presentation

  16. Work place regulations - effects on power station construction

    International Nuclear Information System (INIS)

    Richter, E.

    1979-01-01

    The paper describes that the Workplace Order and Workplace Regulations cannot be applied in every area of a conventional power station or the conventional sections of nuclear power stations. In any case extensive regulations already exist for the hot regions of nuclear power stations. A proposal is made as to which areas of power stations should be developed in accordance with the Workplace Order and the Workplace Regulations and which areas are not deemed to be 'Workplaces'. This is illustrated with the aid of typical examples. (orig.) [de

  17. Partial construction halt to HTR reactor revoked

    International Nuclear Information System (INIS)

    Dauk, W.

    1981-01-01

    The Higher Administrative Court has dismissed the decision of the Arnsberg Administrative Court of February 5, 1981, which had decided in favour of an action for restitution of the suspensive power of an action for annulment of the part-construction permit for the Schmehausen nuclear power plant with a high-temperature reactor, i.e. in favour of a halt to construction. The Higher Administrative Court has revoked this decision on formal grounds - incompetence of the Administrative Court - and on substantial grounds - the halt to construction would be too hard on the power plant producer. The author agrees with this and discusses some aspects of judgment, effective legal aid, etc. (HSCH) [de

  18. Nuclear floating power desalination complexes

    International Nuclear Information System (INIS)

    Panov, Y.K.; Polunichev, V.I.; Zverev, K.V.

    1998-01-01

    Russia is a single country in the world which possesses a powerful ice-breaker transport fleet that allows a solution of important social-economic tasks of the country's northern regions by maintaining a year-round navigation along the Arctic sea route. A total operating record of the marine nuclear reactors up until till now exceeds 150 reactor-years, with their main equipment operating life reacting 120 thousand hours. Design and constructional progresses have been made continuously during forty years of nuclear-powered ships construction in Russia. Well proven technology of all components experienced in the marine nuclear reactors give grounds to recommend marine NSSSs of KLT-40 type as energy sources for the heat and power co-generation plants and the sea water desalination complexes, particularly as a floating installation. Co-generation stations are considered for deployment in the extreme Northern Region of Russia. Nuclear floating desalination complexes can be used for drinkable water production in the coastal regions of Northern Africa, the Near East, India etc. (author)

  19. Radiation dose to construction workers at operating nuclear power plant sites. Volume 2. Appendices A--F. Final report, September 1975--September 1978

    International Nuclear Information System (INIS)

    Endres, G.W.R.; Shipler, D.B.

    1978-12-01

    These appendices contain the dosimetry procedures and details of the personnel and environmental dosimeters used for the Radiation Dose to Construction Workers at Operating Nuclear Power Plant Sites Study. A printout of the computer codes used to analyze dosimeter data is included along with all the raw data obtained. Appendices C through F contain computer output and log-normal plots of dosimetry data for environmental location and construction worker groups

  20. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies