WorldWideScience

Sample records for implementation team plan

  1. Planning for high performance project teams

    International Nuclear Information System (INIS)

    Reed, W.; Keeney, J.; Westney, R.

    1997-01-01

    Both industry-wide research and corporate benchmarking studies confirm the significant savings in cost and time that result from early planning of a project. Amoco's Team Planning Workshop combines long-term strategic project planning and short-term tactical planning with team building to provide the basis for high performing project teams, better project planning, and effective implementation of the Amoco Common Process for managing projects

  2. Determinants of treatment plan implementation in multidisciplinary team meetings for patients with chronic diseases: a mixed-methods study.

    Science.gov (United States)

    Raine, Rosalind; Xanthopoulou, Penny; Wallace, Isla; Nic A' Bháird, Caoimhe; Lanceley, Anne; Clarke, Alex; Livingston, Gill; Prentice, Archie; Ardron, Dave; Harris, Miriam; King, Michael; Michie, Susan; Blazeby, Jane M; Austin-Parsons, Natalie; Gibbs, Simon; Barber, Julie

    2014-10-01

    Multidisciplinary team (MDT) meetings are assumed to produce better decisions and are extensively used to manage chronic disease in the National Health Service (NHS). However, evidence for their effectiveness is mixed. Our objective was to investigate determinants of MDT effectiveness by examining factors influencing the implementation of MDT treatment plans. This is a proxy measure of effectiveness, because it lies on the pathway to improvements in health, and reflects team decision making which has taken account of clinical and non-clinical information. Additionally, this measure can be compared across MDTs for different conditions. We undertook a prospective mixed-methods study of 12 MDTs in London and North Thames. Data were collected by observation of 370 MDT meetings, interviews with 53 MDT members, and from 2654 patient medical records. We examined the influence of patient-related factors (disease, age, sex, deprivation, whether their preferences and other clinical/health behaviours were mentioned) and MDT features (as measured using the 'Team Climate Inventory' and skill mix) on the implementation of MDT treatment plans. The adjusted odds (or likelihood) of implementation was reduced by 25% for each additional professional group represented at the MDT meeting. Implementation was more likely in MDTs with clear goals and processes and a good 'Team Climate' (adjusted OR 1.96; 95% CI 1.15 to 3.31 for a unit increase in Team Climate Inventory (TCI) score). Implementation varied by disease category, with the lowest adjusted odds of implementation in mental health teams. Implementation was also lower for patients living in more deprived areas (adjusted odds of implementation for patients in the most compared with least deprived areas was 0.60, 95% CI 0.39 to 0.91). Greater multidisciplinarity is not necessarily associated with more effective decision making. Explicit goals and procedures are also crucial. Decision implementation should be routinely monitored to

  3. IAEA Sets Up Team to Drive Nuclear Safety Action Plan

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: The International Atomic Energy Agency is setting up a Nuclear Safety Action Team to oversee prompt implementation of the IAEA Action Plan on Nuclear Safety and ensure proper coordination among all stakeholders. The 12-point Action Plan, drawn up in the wake of the Fukushima Daiichi accident, was approved by the Agency's Board of Governors on 13 September and endorsed by all 151 Member States at its General Conference last week. The team will work within the Agency's Department of Nuclear Safety and Security, headed by Deputy Director General Denis Flory, and will coordinate closely with the Director General's Office for Policy. ''The Action Plan requires immediate follow-up,'' Director General Yukiya Amano said. ''This compact, dedicated team will assist Deputy Director General Flory in implementing the measures agreed in the Action Plan.'' Gustavo Caruso, Head of the Regulatory Activities Section in the IAEA's Division of Installation Safety, has been designated as the team's Special Coordinator for the implementation of the Action Plan. The IAEA has already started implementing its responsibilities under the Action Plan, including development of an IAEA methodology for stress tests for nuclear power plants. The methodology will be ready in October. (IAEA)

  4. International Thermonuclear Experimental Reactor U.S. Home Team Quality Assurance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sowder, W. K.

    1998-10-01

    The International Thermonuclear Experimental Reactor (ITER) project is unique in that the work is divided among an international Joint Central Team and four Home Teams, with the overall responsibility for the quality of activities performed during the project residing with the ITER Director. The ultimate responsibility for the adequacy of work performed on tasks assigned to the U.S. Home Team resides with the U.S. Home Team Leader and the U.S. Department of Energy Office of Fusion Energy (DOE-OFE). This document constitutes the quality assurance plan for the ITER U.S. Home Team. This plan describes the controls exercised by U.S. Home Team management and the Performing Institutions to ensure the quality of tasks performed and the data developed for the Engineering Design Activities assigned to the U.S. Home Team and, in particular, the Research and Development Large Projects (7). This plan addresses the DOE quality assurance requirements of 10 CFR 830.120, "Quality Assurance." The plan also describes U.S. Home Team quality commitments to the ITER Quality Assurance Program. The ITER Quality Assurance Program is based on the principles described in the International Atomic Energy Agency Standard No. 50-C-QA, "Quality Assurance for Safety in Nuclear Power Plants and Other Nuclear Facilities." Each commitment is supported with preferred implementation methodology that will be used in evaluating the task quality plans to be submitted by the Performing Institutions. The implementing provisions of the program are based on guidance provided in American National Standards Institute/American Society of Mechanical Engineers NQA-1 1994, "Quality Assurance." The individual Performing Institutions will implement the appropriate quality program provisions through their own established quality plans that have been reviewed and found to comply with U.S. Home Team quality assurance plan commitments to the ITER Quality Assurance Program. The extent of quality program provisions

  5. Planned change or emergent change implementation approach and nurses' professional clinical autonomy.

    Science.gov (United States)

    Luiking, Marie-Louise; Aarts, Leon; Bras, Leo; Grypdonck, Maria; van Linge, Roland

    2017-11-01

    Nurses' clinical autonomy is considered important for patients' outcome and influenced by the implementation approach of innovations. Emergent change approach with participation in the implementation process is thought to increase clinical autonomy. Planned change approach without this participation is thought not to increase clinical autonomy. Evidence of these effects on clinical autonomy is however limited. To examine the changes in clinical autonomy and in personal norms and values for a planned change and emergent change implementation of an innovation, e.g. intensive insulin therapy. Prospective comparative study with two geographically separated nurses' teams on one intensive care unit (ICU), randomly assigned to the experimental conditions. Data were collected from March 2008 to January 2009. Pre-existing differences in perception of team and innovation characteristics were excluded using instruments based on the innovation contingency model. The Nursing Activity Scale was used to measure clinical autonomy. The Personal Values and Norms instrument was used to assess orientation towards nursing activities and the Team Learning Processes instrument to assess learning as a team. Pre-implementation the measurements did not differ. Post-implementation, clinical autonomy was increased in the emergent change team and decreased in the planned change team. The Personal Values and Norms instrument showed in the emergent change team a decreased hierarchic score and increased developmental and rational scores. In the planned change team the hierarchical and group scores were increased. Learning as a team did not differ between the teams. In both teams there was a change in clinical autonomy and orientation towards nursing activities, in line with the experimental conditions. Emergent change implementation resulted in more clinical autonomy than planned change implementation. If an innovation requires the nurses to make their own clinical decisions, an emergent change

  6. [Practical aspects of implementation quality management system ISO 9001:2000 by hospital infection control team].

    Science.gov (United States)

    Kuziemski, Arkadiusz; Czerniak, Beata; Frankowska, Krystyna; Gonia, Ewa; Salińska, Teresa; Motuk, Andrzej; Sobociński, Zbigniew

    2009-01-01

    In 2006 the Board of the Jan Biziel Hospital in Bydgoszcz decided to include procedures of health services in the implementation process within the confines of ISO 9001:2000 certification. The hospital infection control team that has operated in the hospital since 1989 performed the analysis of the forms of activities to date and on that basis the team prepared original plan of quality management. In April 2007, this plan was successfully accepted by the certifying team. The aim of this study is to present the aforementioned plan which is the result of 18 years experience of the team. At the same time, I hope that this study will be very helpful for all professionals interested in hospital epidemiology, especially in the context of implementing quality management systems.

  7. The Implementation of an Interdisciplinary Co-planning Team Model Among Mathematics and Science Teachers

    Science.gov (United States)

    Brown, Michelle Cetner

    In recent years, Science, Technology, Engineering, and Mathematics (STEM) education has become a significant focus of numerous theoretical and commentary articles as researchers have advocated for active and conceptually integrated learning in classrooms. Drawing connections between previously isolated subjects, especially mathematics and science, has been shown to increase student engagement, performance, and critical thinking skills. However, obstacles exist to the widespread implementation of integrated curricula in schools, such as teacher knowledge and school structure and culture. The Interdisciplinary Co-planning Team (ICT) model, in which teachers of different subjects come together regularly to discuss connections between content and to plan larger interdisciplinary activities and smaller examples and discussion points, offers a method for teachers to create sustainable interdisciplinary experiences for students within the bounds of the current school structure. The ICT model is designed to be an iterative, flexible model, providing teachers with both a regular time to come together as "experts" and "teach" each other important concepts from their separate disciplines, and then to bring their shared knowledge and language back to their own classrooms to implement with their students in ways that fit their individual classes. In this multiple-case study, which aims to describe the nature of the co-planning process, the nature of plans, and changes in teacher beliefs as a result of co-planning, three pairs of secondary mathematics and science teachers participated in a 10-week intervention with the ICT model. Each pair constituted one case. Data included observations, interviews, and artifact collection. All interviews, whole-group sessions, and co-planning sessions were transcribed and coded using both theory-based and data-based codes. Finally, a cross-case comparison was used to present similarities and differences across cases. Findings suggest that the

  8. The Planning Task for Teams (PLATT): An environment for research on planning and decision making in teams

    NARCIS (Netherlands)

    Kamphuis, W.; Houttuin, K.

    2007-01-01

    In this report, we introduce a newly developed task environment for experimental team research: the Planning Task for Teams (PLATT). PLATT is a scenario based, computerized, complex planning task for three-person teams. PLATT has been designed to be able to do experimental laboratory research on

  9. Opportunity costs of implementing forest plans

    Science.gov (United States)

    Fox, Bruce; Keller, Mary Anne; Schlosberg, Andrew J.; Vlahovich, James E.

    1989-01-01

    Intellectual concern with the National Forest Management Act of 1976 has followed a course emphasizing the planning aspects of the legislation associated with the development of forest plans. Once approved, however, forest plans must be implemented. Due to the complex nature of the ecological systems of interest, and the multiple and often conflicting desires of user clientele groups, the feasibility and costs of implementing forest plans require immediate investigation. For one timber sale on the Coconino National Forest in Arizona, forest plan constraints were applied and resulting resource outputs predicted using the terrestrial ecosystem analysis and modeling system (TEAMS), a computer-based decision support system developed at the School of Forestry, Northern Arizona University, With forest plan constraints for wildlife habitat, visual diversity, riparian area protection, and soil and slope harvesting restrictions, the maximum timber harvest obtainable was reduced 58% from the maximum obtainable without plan constraints.

  10. Emergency team and action plan; Brigada de emergencia y plan de accion de emergencia

    Energy Technology Data Exchange (ETDEWEB)

    Jimenez Gorgerino, Ruben Dario [Central Hidroelectrica Itaipu, Hernandarias (Paraguay)]. E-mail: jimenez@itaipu.gov.br

    1998-07-01

    This work reports the various activities developed by a commission designated for the investigation of the fire occurred in the excitation panel of the generator unit 16, for the execution of two tasks: short term creation of plant emergency team, and a long term implementation of emergency action plan.

  11. Promoting Action on Research Implementation in Health Services framework applied to TeamSTEPPS implementation in small rural hospitals.

    Science.gov (United States)

    Ward, Marcia M; Baloh, Jure; Zhu, Xi; Stewart, Greg L

    A particularly useful model for examining implementation of quality improvement interventions in health care settings is the PARIHS (Promoting Action on Research Implementation in Health Services) framework developed by Kitson and colleagues. The PARIHS framework proposes three elements (evidence, context, and facilitation) that are related to successful implementation. An evidence-based program focused on quality enhancement in health care, termed TeamSTEPPS (Team Strategies and Tools to Enhance Performance and Patient Safety), has been widely promoted by the Agency for Healthcare Research and Quality, but research is needed to better understand its implementation. We apply the PARIHS framework in studying TeamSTEPPS implementation to identify elements that are most closely related to successful implementation. Quarterly interviews were conducted over a 9-month period in 13 small rural hospitals that implemented TeamSTEPPS. Interview quotes that were related to each of the PARIHS elements were identified using directed content analysis. Transcripts were also scored quantitatively, and bivariate regression analysis was employed to explore relationships between PARIHS elements and successful implementation related to planning activities. The current findings provide support for the PARIHS framework and identified two of the three PARIHS elements (context and facilitation) as important contributors to successful implementation. This study applies the PARIHS framework to TeamSTEPPS, a widely used quality initiative focused on improving health care quality and patient safety. By focusing on small rural hospitals that undertook this quality improvement activity of their own accord, our findings represent effectiveness research in an understudied segment of the health care delivery system. By identifying context and facilitation as the most important contributors to successful implementation, these analyses provide a focus for efficient and effective sustainment of Team

  12. NERSC Strategic Implementation Plan 2002-2006

    Energy Technology Data Exchange (ETDEWEB)

    Kramer, William; Bethel, Wes; Craw, James; Draney, Brent; Fortney, William; Gorda, Brend; Harris, William; Meyer, Nancy; Ng, Esmond; Verdier, Francesca; Walter, Howard; Welcome, Tammy

    2002-09-01

    This strategic proposal presents NERSC's vision for its activities and new directions over the next five years. NERSC's continuing commitment to providing high-end systems and comprehensive scientific support for its users will be enhanced, and these activities will be augmented by two new strategic thrusts: support for Scientific Challenge Teams and deployment of a Unified Science Environment. The proposal is in two volumes, the Strategic Plan and the Implementation Plan.

  13. Schedule optimization study implementation plan

    International Nuclear Information System (INIS)

    1993-11-01

    This Implementation Plan is intended to provide a basis for improvements in the conduct of the Environmental Restoration (ER) Program at Hanford. The Plan is based on the findings of the Schedule Optimization Study (SOS) team which was convened for two weeks in September 1992 at the request of the U.S. Department of Energy (DOE) Richland Operations Office (RL). The need for the study arose out of a schedule dispute regarding the submission of the 1100-EM-1 Operable Unit (OU) Remedial Investigation/Feasibility Study (RI/FS) Work Plan. The SOS team was comprised of independent professionals from other federal agencies and the private sector experienced in environmental restoration within the federal system. The objective of the team was to examine reasons for the lengthy RI/FS process and recommend ways to expedite it. The SOS team issued their Final Report in December 1992. The report found the most serious impediments to cleanup relate to a series of management and policy issues which are within the control of the three parties managing and monitoring Hanford -- the DOE, U.S. Environmental Protection Agency (EPA), and the State of Washington Department of Ecology (Ecology). The SOS Report identified the following eight cross-cutting issues as the root of major impediments to the Hanford Site cleanup. Each of these eight issues is quoted from the SOS Report followed by a brief, general description of the proposed approach being developed

  14. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  15. Building a team through a strategic planning process.

    Science.gov (United States)

    Albert, Debra; Priganc, Dave

    2014-01-01

    Strategic planning is a process often left to senior hospital leadership, with limited input from unit-level, bedside patient care providers. This frequent approach to strategic planning misses the opportunity to engage a wide range of employees, build a shared sense of commitment, produce a collaborative team environment, and to generate greater acceptance of the plan. The Patient Care Services division at the University of Chicago Medicine used a strategic planning process that incorporated 360-degree input from both within the Patient Care Services division and outside of the division. The result is a strategic vision and plan that, shaped by broad-based input from both internal and external constituencies, is strengthened by the team that emerged from the process. Through the process of identifying a common understanding of the group's future direction, a shared purpose was created that transcended traditional professional boundaries and shaped a cohesive team focused on effective and efficient patient care. Now, with a focused strategic plan and a team centered on a shared purpose, the team is beginning to effectively deliver on the plan.

  16. Strategic Team AI Path Plans: Probabilistic Pathfinding

    Directory of Open Access Journals (Sweden)

    Tng C. H. John

    2008-01-01

    Full Text Available This paper proposes a novel method to generate strategic team AI pathfinding plans for computer games and simulations using probabilistic pathfinding. This method is inspired by genetic algorithms (Russell and Norvig, 2002, in that, a fitness function is used to test the quality of the path plans. The method generates high-quality path plans by eliminating the low-quality ones. The path plans are generated by probabilistic pathfinding, and the elimination is done by a fitness test of the path plans. This path plan generation method has the ability to generate variation or different high-quality paths, which is desired for games to increase replay values. This work is an extension of our earlier work on team AI: probabilistic pathfinding (John et al., 2006. We explore ways to combine probabilistic pathfinding and genetic algorithm to create a new method to generate strategic team AI pathfinding plans.

  17. Successful implementation of self-managing teams

    NARCIS (Netherlands)

    Weerheim, W. (Wilke); Van Rossum, L. (Lisa); Ten Have, W.D. (Wouter Dirk)

    2018-01-01

    textabstractPurpose: Following health-care organisations, many mental health-care organisations nowadays consider starting to work with self-managing teams as their organisation structure. Although the concept could be effective, the way of implementing self-managing teams in an organisation is

  18. Technique adaptation, strategic replanning, and team learning during implementation of MR-guided brachytherapy for cervical cancer.

    Science.gov (United States)

    Skliarenko, Julia; Carlone, Marco; Tanderup, Kari; Han, Kathy; Beiki-Ardakani, Akbar; Borg, Jette; Chan, Kitty; Croke, Jennifer; Rink, Alexandra; Simeonov, Anna; Ujaimi, Reem; Xie, Jason; Fyles, Anthony; Milosevic, Michael

    MR-guided brachytherapy (MRgBT) with interstitial needles is associated with improved outcomes in cervical cancer patients. However, there are implementation barriers, including magnetic resonance (MR) access, practitioner familiarity/comfort, and efficiency. This study explores a graded MRgBT implementation strategy that included the adaptive use of needles, strategic use of MR imaging/planning, and team learning. Twenty patients with cervical cancer were treated with high-dose-rate MRgBT (28 Gy in four fractions, two insertions, daily MR imaging/planning). A tandem/ring applicator alone was used for the first insertion in most patients. Needles were added for the second insertion based on evaluation of the initial dosimetry. An interdisciplinary expert team reviewed and discussed the MR images and treatment plans. Dosimetry-trigger technique adaptation with the addition of needles for the second insertion improved target coverage in all patients with suboptimal dosimetry initially without compromising organ-at-risk (OAR) sparing. Target and OAR planning objectives were achieved in most patients. There were small or no systematic differences in tumor or OAR dosimetry between imaging/planning once per insertion vs. daily and only small random variations. Peer review and discussion of images, contours, and plans promoted learning and process development. Technique adaptation based on the initial dosimetry is an efficient approach to implementing MRgBT while gaining comfort with the use of needles. MR imaging and planning once per insertion is safe in most patients as long as applicator shifts, and large anatomical changes are excluded. Team learning is essential to building individual and programmatic competencies. Copyright © 2017 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.

  19. Implementation of a team-based learning course: Work required and perceptions of the teaching team.

    Science.gov (United States)

    Morris, Jenny

    2016-11-01

    Team-based learning was selected as a strategy to help engage pre-registration undergraduate nursing students in a second-year evidence-informed decision making course. To detail the preparatory work required to deliver a team-based learning course; and to explore the perceptions of the teaching team of their first experience using team-based learning. Descriptive evaluation. Information was extracted from a checklist and process document developed by the course leader to document the work required prior to and during implementation. Members of the teaching team were interviewed by a research assistant at the end of the course using a structured interview schedule to explore perceptions of first time implementation. There were nine months between the time the decision was made to use team-based learning and the first day of the course. Approximately 60days were needed to reconfigure the course for team-based learning delivery, develop the knowledge and expertise of the teaching team, and develop and review the resources required for the students and the teaching team. This reduced to around 12days for the subsequent delivery. Interview data indicated that the teaching team were positive about team-based learning, felt prepared for the course delivery and did not identify any major problems during this first implementation. Implementation of team-based learning required time and effort to prepare the course materials and the teaching team. The teaching team felt well prepared, were positive about using team-based learning and did not identify any major difficulties. Crown Copyright © 2016. Published by Elsevier Ltd. All rights reserved.

  20. Successful implementation of self-managing teams

    NARCIS (Netherlands)

    Weerheim, Wilke; Van Rossum, Lisa; Ten Have, Wouter Dirk

    2018-01-01

    Purpose: Following health-care organisations, many mental health-care organisations nowadays consider starting to work with self-managing teams as their organisation structure. Although the concept could be effective, the way of implementing self-managing teams in an organisation is crucial to

  1. Team table: a framework and tool for continuous factory planning

    Science.gov (United States)

    Sihn, Wilfried; Bischoff, Juergen; von Briel, Ralf; Josten, Marcus

    2000-10-01

    Growing market turbulences and shorter product life cycles require a continuous adaptation of factory structures resulting in a continuous factory planning process. Therefore a new framework is developed which focuses on configuration and data management process integration. This enable an online system performance evaluation based on continuous availability of current data. The use of this framework is especially helpful and will guarantee high cost and time savings, when used in the early stages of the planning, called the concept or rough planning phase. The new framework is supported by a planning round table as a tool for team-based configuration processes integrating the knowledge of all persons involved in planning processes. A case study conducted at a German company shows the advantages which can be achieved by implementing the new framework and methods.

  2. Reduction in Mortality Following Pediatric Rapid Response Team Implementation.

    Science.gov (United States)

    Kolovos, Nikoleta S; Gill, Jeff; Michelson, Peter H; Doctor, Allan; Hartman, Mary E

    2018-05-01

    To evaluate the effectiveness of a physician-led rapid response team program on morbidity and mortality following unplanned admission to the PICU. Before-after study. Single-center quaternary-referral PICU. All unplanned PICU admissions from the ward from 2005 to 2011. The dataset was divided into pre- and post-rapid response team groups for comparison. A Cox proportional hazards model was used to identify the patient characteristics associated with mortality following unplanned PICU admission. Following rapid response team implementation, Pediatric Risk of Mortality, version 3, illness severity was reduced (28.7%), PICU length of stay was less (19.0%), and mortality declined (22%). Relative risk of death following unplanned admission to the PICU after rapid response team implementation was 0.685. For children requiring unplanned admission to the PICU, rapid response team implementation is associated with reduced mortality, admission severity of illness, and length of stay. Rapid response team implementation led to more proximal capture and aggressive intervention in the trajectory of a decompensating pediatric ward patient.

  3. Factors affecting strategic plan implementation using interpretive structural modeling (ISM).

    Science.gov (United States)

    Bahadori, Mohammadkarim; Teymourzadeh, Ehsan; Tajik, Hamidreza; Ravangard, Ramin; Raadabadi, Mehdi; Hosseini, Seyed Mojtaba

    2018-06-11

    Purpose Strategic planning is the best tool for managers seeking an informed presence and participation in the market without surrendering to changes. Strategic planning enables managers to achieve their organizational goals and objectives. Hospital goals, such as improving service quality and increasing patient satisfaction cannot be achieved if agreed strategies are not implemented. The purpose of this paper is to investigate the factors affecting strategic plan implementation in one teaching hospital using interpretive structural modeling (ISM). Design/methodology/approach The authors used a descriptive study involving experts and senior managers; 16 were selected as the study sample using a purposive sampling method. Data were collected using a questionnaire designed and prepared based on previous studies. Data were analyzed using ISM. Findings Five main factors affected strategic plan implementation. Although all five variables and factors are top level, "senior manager awareness and participation in the strategic planning process" and "creating and maintaining team participation in the strategic planning process" had maximum drive power. "Organizational structure effects on the strategic planning process" and "Organizational culture effects on the strategic planning process" had maximum dependence power. Practical implications Identifying factors affecting strategic plan implementation is a basis for healthcare quality improvement by analyzing the relationship among factors and overcoming the barriers. Originality/value The authors used ISM to analyze the relationship between factors affecting strategic plan implementation.

  4. Self-Managed Work Teams in Nursing Homes: Implementing and Empowering Nurse Aide Teams

    Science.gov (United States)

    Yeatts, Dale E.; Cready, Cynthia; Ray, Beth; DeWitt, Amy; Queen, Courtney

    2004-01-01

    Purpose: This article describes the progress of our study to examine the advantages and costs of using self-managed nurse aide teams in nursing homes, steps that are being taken to implement such teams, and management strategies being used to manage the teams. Design and Methods: A quasi-experimental design is underway where certified nurse aide…

  5. Team behaviors in emergency care: a qualitative study using behavior analysis of what makes team work.

    Science.gov (United States)

    Mazzocato, Pamela; Forsberg, Helena Hvitfeldt; Schwarz, Ulrica von Thiele

    2011-11-15

    Teamwork has been suggested as a promising approach to improving care processes in emergency departments (ED). However, for teamwork to yield expected results, implementation must involve behavior changes. The aim of this study is to use behavior analysis to qualitatively examine how teamwork plays out in practice and to understand eventual discrepancies between planned and actual behaviors. The study was set in a Swedish university hospital ED during the initial phase of implementation of teamwork. The intervention focused on changing the environment and redesigning the work process to enable teamwork. Each team was responsible for entire care episodes, i.e. from patient arrival to discharge from the ED. Data was collected through 3 days of observations structured around an observation scheme. Behavior analysis was used to pinpoint key teamwork behaviors for consistent implementation of teamwork and to analyze the contingencies that decreased or increased the likelihood of these behaviors. We found a great discrepancy between the planned and the observed teamwork processes. 60% of the 44 team patients observed were handled solely by the appointed team members. Only 36% of the observed patient care processes started according to the description in the planned teamwork process, that is, with taking patient history together. Beside this behavior, meeting in a defined team room and communicating with team members were shown to be essential for the consistent implementation of teamwork. Factors that decreased the likelihood of these key behaviors included waiting for other team members or having trouble locating each other. Getting work done without delay and having an overview of the patient care process increased team behaviors. Moreover, explicit instructions on when team members should interact and communicate increased adherence to the planned process. This study illustrates how behavior analysis can be used to understand discrepancies between planned and observed

  6. Final Action Plan to Tiger Team

    International Nuclear Information System (INIS)

    1992-01-01

    This document presents planned actions, and their associated costs, for addressing the findings in the Environmental, Safety and Health Tiger Team Assessment of the Sandia National Laboratories, Albuquerque, May 1991, hereafter called the Assessment. This Final Action Plan should be read in conjunction with the Assessment to ensure full understanding of the findings addressed herein. The Assessment presented 353 findings in four general categories: (1)Environmental (82 findings); (2) Safety and Health (243 findings); (3) Management and Organization (18 findings); and (4) Self-Assessment (10 findings). Additionally, 436 noncompliance items with Occupational Safety and Health Administration (OSHA) standards were addressed during and immediately after the Tiger Team visit

  7. Distinguishing between taskwork and teamwork planning in teams: relations with coordination and interpersonal processes.

    Science.gov (United States)

    Fisher, David M

    2014-05-01

    Planning in teams represents a critical process that lays the groundwork for effective team functioning. The current investigation examined whether emergent team planning can be meaningfully characterized in terms of a distinction between planning that focuses on taskwork and planning that focuses on teamwork. In Study 1, items written to reflect commonly identified indicators of team planning were subjected to an exploratory factor analysis. In Study 2, slightly modified items were provided to a separate sample, and a confirmatory factor analysis was conducted. In Study 3, the relationships between the different forms of planning and other team processes (i.e., coordination, interpersonal processes) were examined in order to determine whether there are unique relationships for task-focused and team-focused planning. Results from the first 2 studies provided support for a 2-factor structure of team planning, whereas Study 3 found independent relationships for taskwork and teamwork planning with subsequent team processes. Both forms of planning also exhibited indirect relationships with team performance via the mediating role of subsequent team processes. (c) 2014 APA, all rights reserved.

  8. How Do Staff Perceive Schoolwide Positive Behavior Supports? Implications for Teams in Planning and Implementing Schools

    Science.gov (United States)

    Feuerborn, Laura L.; Tyre, Ashli D.

    2016-01-01

    Schoolwide Positive Behavior Support (SWPBS) offers an alternative to reactive and exclusionary school discipline practices. However, the shift to SWPBS requires substantial change in the practices of staff, and many leadership teams struggle to rally staff support for implementation. With a more thorough understanding of staff perceptions, level…

  9. Implementation of Water Safety Plans (WSPs): A Case Study in the Coastal Area in Semarang City, Indonesia

    Science.gov (United States)

    Budiyono; Ginandjar, P.; Saraswati, L. D.; Pangestuti, D. R.; Martini; Jati, S. P.

    2018-02-01

    An area of 508.28 hectares in North Semarang is flooded by tidal inundation, including Bandarharjo village, which could affect water quality in the area. People in Bandarharjo use safe water from deep groundwater, without disinfection process. More than 90% of water samples in the Bandaharjo village had poor bacteriological quality. The aimed of the research was to describe the implementation of Water Safety Plans (WSPs) program in Bandarharjo village. This was a descriptive study with steps for implementations adopted the guidelines and tools of the World Health Organization. The steps consist of introducing WSPs program, team building, training the team, examination of water safety before risk assessment, risk assessment, minor repair I, examination of water safety risk, minor repair II (after monitoring). Data were analyzed using descriptive methods. WSPs program has been introduced and formed WSPs team, and the training of the team has been conducted. The team was able to conduct risks assessment, planned the activities, examined water quality, conduct minor repair and monitoring at the source, distribution, and households connection. The WSPs program could be implemented in the coastal area in Semarang, however regularly supervision and some adjustment are needed.

  10. Interprofessional Health Team Communication About Hospital Discharge: An Implementation Science Evaluation Study.

    Science.gov (United States)

    Bahr, Sarah J; Siclovan, Danielle M; Opper, Kristi; Beiler, Joseph; Bobay, Kathleen L; Weiss, Marianne E

    The Consolidated Framework for Implementation Research guided formative evaluation of the implementation of a redesigned interprofessional team rounding process. The purpose of the redesigned process was to improve health team communication about hospital discharge. Themes emerging from interviews of patients, nurses, and providers revealed the inherent value and positive characteristics of the new process, but also workflow, team hierarchy, and process challenges to successful implementation. The evaluation identified actionable recommendations for modifying the implementation process.

  11. UF's Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP)

    OpenAIRE

    Aufmuth, Joe

    2018-01-01

    Data management plans are created to satisfy funding agency proposal requirements related to the data life cycle. Once an award is made researchers must implement the plan they described. But how is this best accomplished? The presentation UF’s Lone Cabbage Oyster Reef Restoration Project: a use case in implementing a data management plan (DMP) describes how PI's for this grant funded research project are achieving its data management plan goals using an academic library's consulting team.

  12. Developing team leadership to facilitate guideline utilization: planning and evaluating a 3-month intervention strategy.

    Science.gov (United States)

    Gifford, Wendy; Davies, Barbara; Tourangeau, Ann; Lefebre, Nancy

    2011-01-01

    Research describes leadership as important to guideline use. Yet interventions to develop current and future leaders for this purpose are not well understood. To describe the planning and evaluation of a leadership intervention to facilitate nurses' use of guideline recommendations for diabetic foot ulcers in home health care. Planning the intervention involved a synthesis of theory and research (qualitative interviews and chart audits). One workshop and three follow-up teleconferences were delivered at two sites to nurse managers and clinical leaders (n=15) responsible for 180 staff nurses. Evaluation involved workshop surveys and interviews. Highest rated intervention components (four-point scale) were: identification of target indicators (mean 3.7), and development of a team leadership action plan (mean 3.5). Pre-workshop barriers assessment rated lowest (mean 2.9). Three months later participants indicated their leadership performance had changed as a result of the intervention, being more engaged with staff and clear about implementation goals. Creating a team leadership action plan to operationalize leadership behaviours can help in delivery of evidence-informed care. Access to clinical data and understanding team leadership knowledge and skills prior to formal training will assist nursing management in tailoring intervention strategies to identify needs and gaps. © 2010 The Authors. Journal compilation © 2010 Blackwell Publishing Ltd.

  13. TECHNOLOGICAL IMPLEMENTATION PLAN

    DEFF Research Database (Denmark)

    Bellini, Anna

    2004-01-01

    This document has the purpose to describe the technological implementation plan in the IDEAL project.......This document has the purpose to describe the technological implementation plan in the IDEAL project....

  14. New York State Middle Schools and Instructional Scheduling, Teaming and Common Planning: A Descriptive Study

    Science.gov (United States)

    Corey, Chad; Babo, Gerard

    2016-01-01

    Data regarding the type of instructional scheduling utilized along with the use of teaming and common planning at the middle school level has not been collected nor reported on the New York State School Report Card, and therefore it is not known whether and how middle schools are implementing these three school supports. Consequently, the purpose…

  15. Technology Implementation Plan

    DEFF Research Database (Denmark)

    Jensen, Karsten Ingerslev; Schultz, Jørgen Munthe

    The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential.......The Technology Implementation Plan (TIP) describes the main project results and the intended future use. The TIP is confidential....

  16. Science Planning Implementation and Challenges for the ExoMars Trace Gas Orbiter

    Science.gov (United States)

    Ashman, Mike; Cardesin Moinelo, Alejandro; Frew, David; Garcia Beteta, Juan Jose; Geiger, Bernhard; Metcalfe, Leo; Muñoz, Michela; Nespoli, Federico

    2018-05-01

    The ExoMars Science Operations Centre (SOC) is located at ESA's European Space Astronomy Centre (ESAC) in Madrid, Spain and is responsible for coordinating the science planning activities for TGO in order to optimize the scientific return of the mission. The SOC constructs, in accordance with Science Working Team (SWT) science priorities, and in coordination with the PI science teams and ESA's Mission Operations Centre (MOC), a plan of scientific observations and delivers conflict free operational products for uplink and execution on-board. To achieve this, the SOC employs a planning concept based on Long, Medium and Short Term planning cycles. Long Term planning covers mission segments of several months and is conducted many months prior to execution. Its goal is to establish a feasible science observation strategy given the science priorities and the expected mission profile. Medium Term planning covers a 1 month mission segment and is conducted from 3 to 2 months prior to execution whilst Short Term planning covers a 1 week segment and is conducted from 2 weeks to 1 week prior to execution. The goals of Medium and Short Term planning are to operationally instantiate and validate the Long Term plan such that the SOC may deliver to MOC a conflict free spacecraft pointing profile request (a Medium Term planning deliverable), and the final instrument telecommanding products (a Short Term planning deliverable) such that the science plan is achieved and all operational constraints are met. With a 2 hour-400km science orbit, the vast number of solar occultation, nadir measurement, and surface imaging opportunities, combined with additional mission constraints such as the necessary provision of TGO communication slots to support the ExoMars 2020 Rover & Surface Platform mission and NASA surface assets, creates a science planning task of considerable magnitude and complexity. In this paper, we detail how the SOC is developing and implementing the necessary planning

  17. Improved ant Colony Optimization for Virtual Teams Building in Collaborative Process Planning

    Directory of Open Access Journals (Sweden)

    Yingying Su

    2014-02-01

    Full Text Available Virtual teams have been adopted by organizations to gain competitive advantages in this global economy. Virtual teams are a ubiquitous part of getting work done in almost every organization. For the purpose of building virtual teams in collaborative process planning, the method based on improved ant colony algorithm (IMACO was proposed. The concept of virtual team was illustrated and the necessity of building virtual teams in collaborative process planning was analyzed. The sub tasks with certain timing relationship were described and the model of building virtual teams in collaborative process planning was established, which was solved by improved ant colony algorithm. In this paper applications of the IMACO and ACO are compared and demonstrate that the use of the IMACO algorithm performs better. An example was studied to illustrate the effectiveness of the strategy.

  18. Strategic conservation planning for the Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team

    Science.gov (United States)

    Alexander-Vaughn, Louise B.; Collazo, Jaime A.; Drew, C. Ashton

    2014-01-01

    The Eastern North Carolina/Southeastern Virginia Strategic Habitat Conservation Team (ENCSEVA) is a partnership among local federal agencies and programs with a mission to apply Strategic Habitat Conservation to accomplish priority landscape-level conservation within its geographic region. ENCSEVA seeks to further landscape-scale conservation through collaboration with local partners. To accomplish this mission, ENCSEVA is developing a comprehensive Strategic Habitat Conservation Plan (Plan) to provide guidance for its members, partners, and collaborators by establishing mutual conservation goals, objectives, strategies, and metrics to gauge the success of conservation efforts. Identifying common goals allows the ENCSEVA team to develop strategies that leverage joint resources and are more likely to achieve desired impacts across the landscape. The Plan will also provide an approach for ENCSEVA to meet applied research needs (identify knowledge gaps), foster adaptive management principles, identify conservation priorities, prioritize threats (including potential impacts of climate change), and identify the required capacity to implement strategies to create more resilient landscapes. ENCSEVA seeks to support the overarching goals of the South Atlantic Landscape Conservation Cooperative (SALCC) and to provide scientific and technical support for conservation at landscape scales as well as inform the management of natural resources in response to shifts in climate, habitat fragmentation and loss, and other landscape-level challenges (South Atlantic LCC 2012). The ENCSEVA ecoregion encompasses the northern third of the SALCC geography and offers a unique opportunity to apply landscape conservation at multiple scales through the guidance of local conservation and natural resource management efforts and by reporting metrics that reflect the effectiveness of those efforts (Figure 1). The Environmental Decision Analysis Team, housed within the North Carolina Cooperative

  19. Improving Care Teams' Functioning: Recommendations from Team Science.

    Science.gov (United States)

    Fiscella, Kevin; Mauksch, Larry; Bodenheimer, Thomas; Salas, Eduardo

    2017-07-01

    Team science has been applied to many sectors including health care. Yet there has been relatively little attention paid to the application of team science to developing and sustaining primary care teams. Application of team science to primary care requires adaptation of core team elements to different types of primary care teams. Six elements of teams are particularly relevant to primary care: practice conditions that support or hinder effective teamwork; team cognition, including shared understanding of team goals, roles, and how members will work together as a team; leadership and coaching, including mutual feedback among members that promotes teamwork and moves the team closer to achieving its goals; cooperation supported by an emotionally safe climate that supports expression and resolution of conflict and builds team trust and cohesion; coordination, including adoption of processes that optimize efficient performance of interdependent activities among team members; and communication, particularly regular, recursive team cycles involving planning, action, and debriefing. These six core elements are adapted to three prototypical primary care teams: teamlets, health coaching, and complex care coordination. Implementation of effective team-based models in primary care requires adaptation of core team science elements coupled with relevant, practical training and organizational support, including adequate time to train, plan, and debrief. Training should be based on assessment of needs and tasks and the use of simulations and feedback, and it should extend to live action. Teamlets represent a potential launch point for team development and diffusion of teamwork principles within primary care practices. Copyright © 2017 The Joint Commission. Published by Elsevier Inc. All rights reserved.

  20. Implementing a Capital Plan.

    Science.gov (United States)

    Daigneau, William A.

    2003-01-01

    Addresses four questions regarding implementation of a long-term capital plan to manage a college's facilities portfolio: When should the projects be implemented? How should the capital improvements be implemented? What will it actually cost in terms of project costs as well as operating costs? Who will implement the plan? (EV)

  1. Assessing DOE's success in implementing the FFC Act: A federal and state partnership to develop treatment plans

    International Nuclear Information System (INIS)

    Letourneau, M.J.; Bubar, P.M.

    1995-01-01

    Implementation of the Federal Facility Compliance Act (FFCAct) required total cooperation among the Department of Energy (DOE), the involved States and interested stakeholders. Although the effort was time consuming, tedious and (at times) trying, the results obtained [Site Treatment Plans (STP)] were an unprecedented success. Through long-range planning, attention to details and organization of effort, a coordinated, cohesive, focused team was developed that included the DOE Headquarters, the Environmental Protection Agency (EPA), 40 DOE sites, 20 states and multiple interested stakeholders. The efforts of the FFCAct team resulted in the preparation of 37 STPs which outline the methods, locations and schedules for the treatment and disposal of DOE's mixed wastes. The Plans provided a strong foundation upon which consent orders were prepared and approved. The FFCAct approach also resulted in the development of working relationships that will prove not only useful but vital to the planning and implementation necessary to the successful clean-up and disposal DOE's mixed wastes

  2. Multidisciplinary team functioning.

    Science.gov (United States)

    Kovitz, K E; Dougan, P; Riese, R; Brummitt, J R

    1984-01-01

    This paper advocates the need to move beyond interdisciplinary team composition as a minimum criterion for multidisciplinary functioning in child abuse treatment. Recent developments within the field reflect the practice of shared professional responsibility for detection, case management and treatment. Adherence to this particular model for intervention requires cooperative service planning and implementation as task related functions. Implicitly, this model also carries the potential to incorporate the supportive functioning essential to effective group process. However, explicit attention to the dynamics and process of small groups has been neglected in prescriptive accounts of multidisciplinary child abuse team organization. The present paper therefore focuses upon the maintenance and enhancement aspects of multidisciplinary group functioning. First, the development and philosophy of service for the Alberta Children's Hospital Child Abuse Program are reviewed. Second, composition of the team, it's mandate for service, and the population it serves are briefly described. Third, the conceptual framework within which the program functions is outlined. Strategies for effective group functioning are presented and the difficulties encountered with this model are highlighted. Finally, recommendations are offered for planning and implementing a multidisciplinary child abuse team and for maintaining its effective group functioning.

  3. Interdisciplinary Team Collaboration during Discharge of Depressed Older Persons: A Norwegian Qualitative Implementation Study

    Directory of Open Access Journals (Sweden)

    Anne Lise Holm

    2013-01-01

    Full Text Available In order to deliver effective care, it is necessary to organise interdisciplinary activities for older persons who suffer from depressive disorders. This paper evaluated the interdisciplinary team members’ perceptions of cooperation in the discharge planning of depressed older persons based on the Chronic Care Model (CCM. A qualitative implementation design was used, data were collected by means of multistage focus groups, and a thematic analysis was performed. Three themes emerged: lack of effective team leadership in the community, the need to change the delivery system, and enhancing self-management support for depressed older persons as well as the participation of their families. It was concluded that nurse managers must find ways of supporting the depressed older persons by better structuring the care, increasing cooperation with organisational leadership, and creating an environment characterised by trust and mutual respect. Distrust can have serious implications for discharge planning collaboration. The development of a common vision of transparency in the organization is important as is a policy of change among leadership and in clinical practice.

  4. The importance of team functioning to natural resource planning outcomes.

    Science.gov (United States)

    Stern, Marc J; Predmore, S Andrew

    2012-09-15

    In its recent history, the U.S. Forest Service is among many federal land management agencies struggling with questions concerning why its planning procedures are sometimes inefficient, perform poorly in the eyes of the public, and fail to deliver outputs that advance agency mission. By examining a representative sample of National Environmental Policy Act (NEPA) processes conducted by the agency between 2007 and 2009, we provide new insights into what drives outcomes in these planning processes. We examined team leaders' perceptions of the following outcomes: achievement of agency goals and NEPA mandates, process efficiency, public relations, and team outcomes. The most consistently important predictors of positive outcomes were team harmony and a clearly empowered team leader. Other factors, such as perceptions of the use of best science, a clear and unambiguous purpose and need, team turnover (personnel changes during the process), extra-agency engagement, and intra-agency relations, were also important, but played a less consistent role. The findings suggest the importance of empowering team leaders and team members through enhancing elements of discretion, responsibility, clear role definition, collaborative interdisciplinary deliberation, and perceived self-efficacy. The results also suggest the importance of genuine concern and respect for participating publics and effective inter-agency coordination. Copyright © 2012 Elsevier Ltd. All rights reserved.

  5. Assessing DOE`s success in implementing the FFC Act: A federal and state partnership to develop treatment plans

    Energy Technology Data Exchange (ETDEWEB)

    Letourneau, M.J.; Bubar, P.M. [Dept. of Energy, Germantown, MD (United States)

    1995-12-31

    Implementation of the Federal Facility Compliance Act (FFCAct) required total cooperation among the Department of Energy (DOE), the involved States and interested stakeholders. Although the effort was time consuming, tedious and (at times) trying, the results obtained [Site Treatment Plans (STP)] were an unprecedented success. Through long-range planning, attention to details and organization of effort, a coordinated, cohesive, focused team was developed that included the DOE Headquarters, the Environmental Protection Agency (EPA), 40 DOE sites, 20 states and multiple interested stakeholders. The efforts of the FFCAct team resulted in the preparation of 37 STPs which outline the methods, locations and schedules for the treatment and disposal of DOE`s mixed wastes. The Plans provided a strong foundation upon which consent orders were prepared and approved. The FFCAct approach also resulted in the development of working relationships that will prove not only useful but vital to the planning and implementation necessary to the successful clean-up and disposal DOE`s mixed wastes.

  6. Program Implementation Plan

    International Nuclear Information System (INIS)

    1987-06-01

    The Program Implementation Plan (PIP) describes the US Department of Energy's (DOE's) current approaches for managing the permanent disposal of defense high-level waste (HLW), transuranic (TRU) waste, and low-level waste (LLW) from atomic energy defense activities. It documents the implementation of the HLW and TRU waste policies as stated in the Defense Waste Management Plan (DWMP) (DOE/DP-0015), dated June 1983, and also addresses the management of LLW. The narrative reflects both accomplishments and changes in the scope of activities. All cost tables and milestone schedules are current as of January 1987. The goals of the program, to provide safe processing and utilization, storage, and disposal of DOE radioactive waste and byproducts to support defense nuclear materials production activities, and to implement cost-effective improvements in all of its ongoing and planned activities, have not changed

  7. Integrated Project Teams - An Essential Element of Project Management during Project Planning and Execution - 12155

    Energy Technology Data Exchange (ETDEWEB)

    Burritt, James G.; Berkey, Edgar [Longenecker and Associates, Las Vegas, NV 89135 (United States)

    2012-07-01

    Managing complex projects requires a capable, effective project manager to be in place, who is assisted by a team of competent assistants in various relevant disciplines. This team of assistants is known as the Integrated Project Team (IPT). he IPT is composed of a multidisciplinary group of people who are collectively responsible for delivering a defined project outcome and who plan, execute, and implement over the entire life-cycle of a project, which can be a facility being constructed or a system being acquired. An ideal IPT includes empowered representatives from all functional areas involved with a project-such as engineering design, technology, manufacturing, test and evaluation, contracts, legal, logistics, and especially, the customer. Effective IPTs are an essential element of scope, cost, and schedule control for any complex, large construction project, whether funded by DOE or another organization. By recently assessing a number of major, on-going DOE waste management projects, the characteristics of high performing IPTs have been defined as well as the reasons for potential IPT failure. Project managers should use IPTs to plan and execute projects, but the IPTs must be properly constituted and the members capable and empowered. For them to be effective, the project manager must select the right team, and provide them with the training and guidance for them to be effective. IPT members must treat their IPT assignment as a primary duty, not some ancillary function. All team members must have an understanding of the factors associated with successful IPTs, and the reasons that some IPTs fail. Integrated Project Teams should be used by both government and industry. (authors)

  8. Staff Concerns in Schools Planning for and Implementing School-Wide Positive Behavior Interventions and Supports

    Science.gov (United States)

    Tyre, Ashli D.; Feuerborn, Laura L.; Woods, Leslie

    2018-01-01

    Understanding staff concerns about a systemic change effort allows leadership teams to better anticipate and address staff needs for professional development and support. In this study, staff concerns in nine schools planning for or implementing School-Wide Positive Behavior Interventions and Supports (SWPBIS) were explored using the…

  9. Implementing Total Quality Management in a University Setting.

    Science.gov (United States)

    Coate, L. Edwin

    1991-01-01

    Oregon State University implemented Total Quality Management in nine phases: exploration; establishing a pilot study team; defining customer needs; adopting the breakthrough planning process; performing breakthrough planning in divisions; forming daily management teams; initiating cross-functional pilot projects; implementing cross-functional…

  10. Project Planning and Control in a Developing Economy: Implementation and Realisation

    Directory of Open Access Journals (Sweden)

    H. Abdul-Rahman

    2005-12-01

    Full Text Available In the competitive and uncertain environment of the construction industry, the ability to deliver end products with the required quality, schedule and budget is vital to the survival of any construction-related firm. Before embarking on any project, realistic planning and, consequently, a control procedure must be in place to enable the parties to manage the project with sufficient degree of authority and certainty. This paper addresses issues associated with the implementation of project planning and control, identificati on of impacts in the implementation of project planning and the critical success factors of project planning. A questionnaire survey was conducted on construction professionals and contractors involved in the running of construction projects. The survey results showed that common problems associated with the project planning and control are the lack of experienced staff and poor coordination by the contractor. During site operation, a delay in decision making aggravates the effect of poor planning and control and much of the effect of project planning rests on the pro-activeness of experienced staff. The positive impact associated with proper planning and control is the high probability of finishing the project on time while the negative impact is that it is a time-consuming and costly process. The critical success factors identified from the survey are Excellent Teamwork and Experienced Team.

  11. Practice and quality improvement: successful implementation of TeamSTEPPS tools into an academic interventional ultrasound practice.

    Science.gov (United States)

    Gupta, Rajan T; Sexton, J Bryan; Milne, Judy; Frush, Donald P

    2015-01-01

    The goal of this study was to implement an evidence-based teamwork system to improve communication and teamwork skills among health care professionals (TeamSTEPPS) into an academic interventional ultrasound program and to assess safety and team-work climate across team members both before and after implementation. Members of a change team (including master trainers) selected specific tools available within TeamSTEPPS to implement into an academic interventional ultrasound service. Tools selected were based on preimplementation survey data obtained from team members (n = 64: 11 attending faculty physicians, 12 clinical abdominal imaging fellows or residents, 17 sonographers, 19 nurses, and five technologist aides or administrative personnel). The survey included teamwork climate and safety climate domains from the Safety Attitudes Questionnaire. Four months after implementation, respondents were resurveyed and post-implementation data were collected. Teamwork climate scores improved from a mean of 67.9 (SD, 12.8) before implementation to a mean of 87.8 (SD, 14.1) after implementation (t = -7.6; p ultrasound practice. The most notable improvements were seen in communication among team members and role clarification. We think that this model, which has been successfully implemented in many nonradiologic areas in medical care, is also applicable in imaging practice.

  12. MRP (materiel requirements planning) II education: a team-building experience.

    Science.gov (United States)

    Iemmolo, G R

    1994-05-01

    Conestoga Wood Specialties, a leader in the woodworking industry, is constantly striving for continuous improvement in manufacturing and service. Recently, the company embarked on a major MRP II education effort that served as a framework for team building. This team building concept has carried over into other aspects related to the business, such as the formalization of the sales and operations planning meeting. At Conestoga Wood, it is recognized that successful team building is necessary to achieve and maintain world-class performance.

  13. Pollution prevention program implementation plan

    International Nuclear Information System (INIS)

    Engel, J.A.

    1996-09-01

    The Pollution Prevention Program Implementation Plan (the Plan) describes the Pacific Northwest National Laboratory's (PNNL) Pollution Prevention (P2) Program. The Plan also shows how the P2 Program at PNNL will be in support of and in compliance with the Hanford Site Waste Minimization and Pollution Prevention (WMin/P2) Awareness Program Plan and the Hanford Site Guide for Preparing and Maintaining Generator Group Pollution Prevention Program Documentation. In addition, this plan describes how PNNL will demonstrate compliance with various legal and policy requirements for P2. This plan documents the strategy for implementing the PNNL P2 Program. The scope of the P2 Program includes implementing and helping to implement P2 activities at PNNL. These activities will be implemented according to the Environmental Protection Agency's (EPA) hierarchy of source reduction, recycling, treatment, and disposal. The PNNL P2 Program covers all wastes generated at the Laboratory. These include hazardous waste, low-level radioactive waste, radioactive mixed waste, radioactive liquid waste system waste, polychlorinated biphenyl waste, transuranic waste, and sanitary waste generated by activities at PNNL. Materials, resource, and energy conservation are also within the scope of the PNNL P2 Program

  14. [Social representation of a healthcare team on family planning and female sterilization].

    Science.gov (United States)

    Marcolino, Clarice

    2004-12-01

    The objective in this qualitative study was to obtain the discourse of the members of a healthcare team on family planning and female sterilization, and those practical effects on the work of the team. Marxist dialectic and social representations were used as references. Data were obtained by interviews and observations of certain activities of the members of the healthcare team and were subjected to analysis of the discourse. Family planning and female sterilization were considered to be rights, which pertained to the women, although the exercise of those rights is hindered by the limitations of access to contraceptive methods in general.

  15. Environmental protection Implementation Plan

    International Nuclear Information System (INIS)

    Holland, R. C.

    1999-01-01

    This ''Environmental Protection Implementation Plan'' is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The ''Environmental Protection Implementation Plan'' helps management and staff comply with applicable environmental responsibilities

  16. Corrective Action Plan in response to the March 1992 Tiger Team Assessment of the Ames Laboratory

    International Nuclear Information System (INIS)

    1992-01-01

    On March 5, 1992, a Department of Energy (DOE) Tiger Team completed an assessment of the Ames Laboratory, located in Ames, Iowa. The purpose of the assessment was to provide the Secretary of Energy with a report on the status and performance of Environment, Safety and Health (ES ampersand H) programs at Ames Laboratory. Detailed findings of the assessment are presented in the report, DOE/EH-0237, Tiger Team Assessment of the Ames Laboratory. This document, the Ames Laboratory Corrective Action Plan (ALCAP), presents corrective actions to overcome deficiencies cited in the Tiger Team Assessment. The Tiger Team identified 53 Environmental findings, from which the Team derived four key findings. In the Safety and Health (S ampersand H) area, 126 concerns were identified, eight of which were designated Category 11 (there were no Category I concerns). Seven key concerns were derived from the 126 concerns. The Management Subteam developed 19 findings which have been summarized in four key findings. The eight S ampersand H Category 11 concerns identified in the Tiger Team Assessment were given prompt management attention. Actions to address these deficiencies have been described in individual corrective action plans, which were submitted to DOE Headquarters on March 20, 1992. The ALCAP includes actions described in this early response, as well as a long term strategy and framework for correcting all remaining deficiencies. Accordingly, the ALCAP presents the organizational structure, management systems, and specific responses that are being developed to implement corrective actions and to resolve root causes identified in the Tiger Team Assessment. The Chicago Field Office (CH), IowaState University (ISU), the Institute for Physical Research and Technology (IPRT), and Ames Laboratory prepared the ALCAP with input from the DOE Headquarters, Office of Energy Research (ER)

  17. Successful strategies in implementing a multidisciplinary team working in the care of patients with cancer: an overview and synthesis of the available literature.

    Science.gov (United States)

    Soukup, Tayana; Lamb, Benjamin W; Arora, Sonal; Darzi, Ara; Sevdalis, Nick; Green, James Sa

    2018-01-01

    In many health care systems globally, cancer care is driven by multidisciplinary cancer teams (MDTs). A large number of studies in the past few years and across different literature have been performed to better understand how these teams work and how they manage patient care. The aim of our literature review is to synthesize current scientific and clinical understanding on cancer MDTs and their organization; this, in turn, should provide an up-to-date summary of the current knowledge that those planning or leading cancer services can use as a guide for service implementation or improvement. We describe the characteristics of an effective MDT and factors that influence how these teams work. A range of factors pertaining to teamwork, availability of patient information, leadership, team and meeting management, and workload can affect how well MDTs are implemented within patient care. We also review how to assess and improve these teams. We present a range of instruments designed to be used with cancer MDTs - including observational tools, self-assessments, and checklists. We conclude with a practical outline of what appears to be the best practices to implement (Dos) and practices to avoid (Don'ts) when setting up MDT-driven cancer care.

  18. Successful strategies in implementing a multidisciplinary team working in the care of patients with cancer: an overview and synthesis of the available literature

    Science.gov (United States)

    Soukup, Tayana; Lamb, Benjamin W; Arora, Sonal; Darzi, Ara; Sevdalis, Nick; Green, James SA

    2018-01-01

    In many health care systems globally, cancer care is driven by multidisciplinary cancer teams (MDTs). A large number of studies in the past few years and across different literature have been performed to better understand how these teams work and how they manage patient care. The aim of our literature review is to synthesize current scientific and clinical understanding on cancer MDTs and their organization; this, in turn, should provide an up-to-date summary of the current knowledge that those planning or leading cancer services can use as a guide for service implementation or improvement. We describe the characteristics of an effective MDT and factors that influence how these teams work. A range of factors pertaining to teamwork, availability of patient information, leadership, team and meeting management, and workload can affect how well MDTs are implemented within patient care. We also review how to assess and improve these teams. We present a range of instruments designed to be used with cancer MDTs – including observational tools, self-assessments, and checklists. We conclude with a practical outline of what appears to be the best practices to implement (Dos) and practices to avoid (Don’ts) when setting up MDT-driven cancer care. PMID:29403284

  19. Individual versus interprofessional team performance in formulating care transition plans: A randomised study of trainees from five professional groups.

    Science.gov (United States)

    Farrell, Timothy W; Supiano, Katherine P; Wong, Bob; Luptak, Marilyn K; Luther, Brenda; Andersen, Troy C; Wilson, Rebecca; Wilby, Frances; Yang, Rumei; Pepper, Ginette A; Brunker, Cherie P

    2018-05-01

    Health professions trainees' performance in teams is rarely evaluated, but increasingly important as the healthcare delivery systems in which they will practice move towards team-based care. Effective management of care transitions is an important aspect of interprofessional teamwork. This mixed-methods study used a crossover design to randomise health professions trainees to work as individuals and as teams to formulate written care transition plans. Experienced external raters assessed the quality of the written care transition plans as well as both the quality of team process and overall team performance. Written care transition plan quality did not vary between individuals and teams (21.8 vs. 24.4, respectively, p = 0.42). The quality of team process did not correlate with the quality of the team-generated written care transition plans (r = -0.172, p = 0.659). However, there was a significant correlation between the quality of team process and overall team performance (r = 0.692, p = 0.039). Teams with highly engaged recorders, performing an internal team debrief, had higher-quality care transition plans. These results suggest that high-quality interprofessional care transition plans may require advance instruction as well as teamwork in finalising the plan.

  20. The One Plan Project: A cooperative effort of the National Response Team and the Region 6 Regional Response Team to simplify facility emergency response planning

    International Nuclear Information System (INIS)

    Staves, J.; McCormick, K.

    1997-01-01

    The National Response Team (NRT) in coordination with the Region 6 Response Team (RRT) have developed a facility contingency plan format which would integrate all existing regulatory requirements for contingency planning. This format was developed by a multi-agency team, chaired by the USEPA Region 6, in conjunction with various industry, labor, and public interest groups. The impetus for this project came through the USEPA Office of Chemical Emergency Preparedness and Prevention (CEPPO). The current national oil and hazardous material emergency preparedness and response system is an amalgam of federal, state, local, and industrial programs which are often poorly coordinated. In a cooperative effort with the NRT, the CEPPO conducted a Presidential Review of federal agency authorities and coordination responsibilities regarding release prevention, mitigation, and response. Review recommendations led to a Pilot Project in USEPA Region 6. The Region 6 Pilot Project targeted end users in the intensely industrialized Houston Ship Channel (HSC) area, which is comprised of petroleum and petrochemical companies

  1. A systematic review of team formulation in clinical psychology practice: Definition, implementation, and outcomes.

    Science.gov (United States)

    Geach, Nicole; Moghaddam, Nima G; De Boos, Danielle

    2017-10-03

    Team formulation is promoted by professional practice guidelines for clinical psychologists. However, it is unclear whether team formulation is understood/implemented in consistent ways - or whether there is outcome evidence to support the promotion of this practice. This systematic review aimed to (1) synthesize how team formulation practice is defined and implemented by practitioner psychologists and (2) analyse the range of team formulation outcomes in the peer-reviewed literature. Seven electronic bibliographic databases were searched in June 2016. Eleven articles met inclusion criteria and were quality assessed. Extracted data were synthesized using content analysis. Descriptions of team formulation revealed three main forms of instantiation: (1) a structured, consultation approach; (2) semi-structured, reflective practice meetings; and (3) unstructured/informal sharing of ideas through routine interactions. Outcome evidence linked team formulation to a range of outcomes for staff teams and service users, including some negative outcomes. Quality appraisal identified significant issues with evaluation methods; such that, overall, outcomes were not well-supported. There is weak evidence to support the claimed beneficial outcomes of team formulation in practice. There is a need for greater specification and standardization of 'team formulation' practices, to enable a clearer understanding of any relationships with outcomes and implications for best-practice implementations. Under the umbrella term of 'team formulation', three types of practice are reported: (1) highly structured consultation; (2) reflective practice meetings; and (3) informal sharing of ideas. Outcomes linked to team formulation, including some negative outcomes, were not well evidenced. Research using robust study designs is required to investigate the process and outcomes of team formulation practice. © 2017 The British Psychological Society.

  2. Chicago-St. Louis high speed rail plan

    Energy Technology Data Exchange (ETDEWEB)

    Stead, M.E.

    1994-12-31

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team`s analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor.

  3. Critical success factors for offshoring of enterprise resource planning (ERP implementations

    Directory of Open Access Journals (Sweden)

    Rajneesh Chauhan

    2012-01-01

    Full Text Available Background: In recent years, offshoring enterprise resource planning (ERP implementation has been an emerging trend in the field of offshoring information technology (IT. However, both ERP implementations and IT offshoring are fraught with risks, and when both ERP implementation and IT offshoring happen together, the risks become even more pronounced. Therefore, it is important to understand and identify the issues of ERP implementation in an offshoring situation. Objectives: The purpose of this paper is to highlight the key factors that enable successful offshoring ERP implementation from the client and the vendor perspective. Methods/Approach: The paper uses literature as a basis for identifying a critical success factor, data collected through semi-structured interviews with ERP managers at various levels of the subject organizations, and eventually their analysis. Results: The findings of the paper reveal that various factors are critical while implementing offshoring ERP. They include: offshoring partnership, project management, project team composition, people issues, communications and compliance of the onsite team composition. It is also noticed that ten factors are grouped into three categories: the client side, the vendor side, and both. Conclusions: Organizations are currently undertaking or considering the offshoring ERP implementation particularly from India. This paper will enable them to understand the possible challenges and areas of offshoring the ERP implementation program. The value and originality of the paper comes from the fact that up to now, ERP implementation in offshoring has not been comprehensively explored. This research provides a complete understanding of the critical success factors from the client, the vendor or both the client and the vendor perspective. It also enables researchers to analyse ili rethink ili review offshoring in different service areas.

  4. Implementing Team Based Learning in an Information Literacy Course

    Directory of Open Access Journals (Sweden)

    Marijn Post

    2016-12-01

    Full Text Available Introduction: Motivating students to improve their Information Literacy (IL skills can be a challenge. As a pilot, we implemented Team Based Learning (TBL in our IL lessons. TBL is an interactive learning approach based on the “flipped classroom” concept, offering students opportunities to gather skills via immediate feedback during individual and team activities. Moreover, TBL promises to be an attractive and activating way of learning. We were interested if TBL, A indeed activates students and B improves their IL skills more than with lectures and self-tuition. Methods: TBL was implemented in a first year bachelor IL course in the year 2015-2016. Student were asked to study three IL e-learning modules before class. The obtained knowledge was assessed individually during an Individual Readiness Assessment test (IRAT and in a team via a Team Readiness Assessment test (TRAT using “scratch and win cards”. After this, teams were given an IL case and the members had to come to a consensus about the best solution out of a couple options provided. Finally, students took a written exam, which was the same as used in this course in the year 2014-2015, when TBL was not applied yet. We compared the grades of the written exam between the two academic years using a Mann Whitney U test (P<0.05. Students’ opinion about TBL was polled using a 34 question student survey. Results: The mean written exam grades were significantly higher in the TBL year than in the preceding year without TBL (respectively, 7.6 ± 1.42 vs 6.5 ± 1.31, P<0.001. The student survey showed that students were positive about the IRATs and TRATs, but neutral about other TBL parts. Conclusion: TBL seems to be a good didactical method to motivate students and enhance their IL skills.

  5. Team Training in the Perioperative Arena: A Methodology for Implementation and Auditing Behavior.

    Science.gov (United States)

    Rhee, Amanda J; Valentin-Salgado, Yessenia; Eshak, David; Feldman, David; Kischak, Pat; Reich, David L; LoPachin, Vicki; Brodman, Michael

    Preventable medical errors in the operating room are most often caused by ineffective communication and suboptimal team dynamics. TeamSTEPPS is a government-funded, evidence-based program that provides tools and education to improve teamwork in medicine. The study hospital implemented TeamSTEPPS in the operating room and merged the program with a surgical safety checklist. Audits were performed to collect both quantitative and qualitative information on time out (brief) and debrief conversations, using a standardized audit tool. A total of 1610 audits over 6 months were performed by live auditors. Performance was sustained at desired levels or improved for all qualitative metrics using χ 2 and linear regression analyses. Additionally, the absolute number of wrong site/side/person surgery and unintentionally retained foreign body counts decreased after TeamSTEPPS implementation.

  6. Planning and Implementing Shared Teaching: An MBA Team-Teaching Case Study

    Science.gov (United States)

    Helms, Marilyn M.; Alvis, John M.; Willis, Marilyn

    2005-01-01

    Team teaching is a popular trend in business education. In an attempt to integrate seemingly disparate functional disciplines, a number of business programs have combined courses. Regardless of the courses combined (marketing and finance, management and accounting, economics and strategy, or production and cost accounting), the teaching pedagogy…

  7. Team functioning as a predictor of patient outcomes in early medical home implementation.

    Science.gov (United States)

    Wu, Frances M; Rubenstein, Lisa V; Yoon, Jean

    2018-03-12

    New models of patient-centered primary care such as the patient-centered medical home (PCMH) depend on high levels of interdisciplinary primary care team functioning to achieve improved outcomes. A few studies have qualitatively assessed barriers and facilitators to optimal team functioning; however, we know of no prior study that assesses PCMH team functioning in relationship to patient health outcomes. The aim of the study was to assess the relationships between primary care team functioning, patients' use of acute care, and mortality. Retrospective longitudinal cohort analysis of patient outcomes measured at two time points (2012 and 2013) after PCMH implementation began in Veterans Health Administration practices. Multilevel models examined practice-level measures of team functioning in relationship to patient outcomes (all-cause and ambulatory care-sensitive condition-related hospitalizations, emergency department visits, and mortality). We controlled for practice-level factors likely to affect team functioning, including leadership support, provider and staff burnout, and staffing sufficiency, as well as for individual patient characteristics. We also tested the model among a subgroup of vulnerable patients (homeless, mentally ill, or with dementia). In adjusted analyses, higher team functioning was associated with lower mortality (OR = 0.92, p = .04) among all patients and with fewer all-cause admissions (incidence rate ratio [IRR] = 0.90, p team functioning within PCMH models for achieving improved patient outcomes. A focus on team functioning is important especially in the early implementation of team-based primary care models.

  8. Insights of health district managers on the implementation of primary health care outreach teams in Johannesburg, South Africa: a descriptive study with focus group discussions.

    Science.gov (United States)

    Moosa, Shabir; Derese, Anselme; Peersman, Wim

    2017-01-21

    Primary health care (PHC) outreach teams are part of a policy of PHC re-engineering in South Africa. It attempts to move the deployment of community health workers (CHWs) from vertical programmes into an integrated generalised team-based approach to care for defined populations in municipal wards. There has little evaluation of PHC outreach teams. Managers' insights are anecdotal. This is descriptive qualitative study with focus group discussions with health district managers of Johannesburg, the largest city in South Africa. This was conducted in a sequence of three meetings with questions around implementation, human resources, and integrated PHC teamwork. There was a thematic content analysis of validated transcripts using the framework method. There were two major themes: leadership-management challenges and human resource challenges. Whilst there was some positive sentiment, leadership-management challenges loomed large: poor leadership and planning with an under-resourced centralised approach, poor communications both within the service and with community, concerns with its impact on current services and resistance to change, and poor integration, both with other streams of PHC re-engineering and current district programmes. Discussion by managers on human resources was mostly on the plight of CHWs and calls for formalisation of CHWs functioning and training and nurse challenges with inappropriate planning and deployment of the team structure, with brief mention of the extended team. Whilst there is positive sentiment towards intent of the PHC outreach team, programme managers in Johannesburg were critical of management of the programme in their health district. Whilst the objective of PHC reform is people-centred health care, its implementation struggles with a centralising tendency amongst managers in the health service in South Africa. Managers in Johannesburg advocated for decentralisation. The implementation of PHC outreach teams is also limited by

  9. Work-Team Implementation and Trajectories of Manufacturing Quality: A Longitudinal Field Study

    OpenAIRE

    Rajiv D. Banker; Joy M. Field; Kingshuk K. Sinha

    2001-01-01

    The study examines the sustainability of manufacturing quality improvements following the implementation of work teams on production lines. We posit that the impact on manufacturing quality, measured as the defect rate trajectory, is monotonically nonincreasing over time and may, more specifically, assume the shape of an inverted S-curve. Employing a longitudinal research design, we investigate four work teams over a 28-month period in a field setting. Each team corresponds to one of the four...

  10. Maintenance Implementation Plan for B Plant

    International Nuclear Information System (INIS)

    Tritt, S.E.

    1993-04-01

    The objective of the Maintenance Implementation Plan (MIP) is to describe how the B Plant will implement the requirements established by US Department of Energy (DOE) Order 4330.4A, Maintenance Management Program, Chapter II, ''Nuclear Facilities'' (DOE 1990). The plan provides a blueprint for a disciplined approach to implementation and compliance. Each element of the order is prioritized, categorized, and then placed into one of three phases for implementation

  11. Approved Air Quality Implementation Plans in Region 10

    Science.gov (United States)

    Landing page for information about EPA-approved air quality State Implementation Plans (SIPs), Tribal Implementation Plans (TIPs), and Federal Implementation Plans (FIPs) in Alaska, Idaho, Oregon, Washington.

  12. The Participation Role of Villagers in Village Plan Implementation: A Comparative Study on Two Villages in Guangxi Zhuang Autonomous Region, China

    Institute of Scientific and Technical Information of China (English)

    Chengzhi; YIN; Haitao; CHEN

    2013-01-01

    China is in a process of rapid urbanization. Meanwhile, building development in rural areas is also accelerating. The paper intends to illustrate an original study focusing on villagers’ role in participation in village plan implementation in rural areas of China. Case studies, comparative studies, interviews, and questionnaires have been applied to reveal the mechanism of villager participation in village plan imple-mentation. Two case villages, which are pioneer units in the transition in Guangxi Zhuang Autonomous Region, have been selected. The study outcome shows that the villager participation plays an extremely important role in implementing the official village plan. The ideal development regulation mode in village planning in rural China should be a local government-villager cooperating system formed by three pillars: financial and technical supports from local governments; the participation of rural autonomous organizations, non-governmental organizations, and 'able persons' in formulation, implementation, and monitoring of official village plans; village construction teams like developers.

  13. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1993-01-01

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex

  14. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site's environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy's Nuclear Weapons Complex.

  15. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-03-15

    The purpose of the Environmental Implementation Plan (EIP) is to show the current and future (five years) environmental plans from individual site organizations and divisions, as well as site environmental programs and initiatives which are designed to protect the environment and meet or exceed changing environmental/regulatory requirements. Communicating with site organizations, departments, and committees is essential in making the site`s environmental-planning process work. The EIP gives the site the what, when, how, and why for environmental requirements. Through teamwork and proactive planning, a partnership for environmental excellence is formed to achieve the site vision for SRS to become the recognized model for Environmental Excellence in the Department of Energy`s Nuclear Weapons Complex.

  16. Connecting the dots : supporting the implementation of teacher design teams

    NARCIS (Netherlands)

    Binkhorst, Floor

    2017-01-01

    In Teacher Design Teams (TDTs), teachers collaborate on (re)designing educational materials. Although several studies have shown that TDTs can contribute to teachers’ professional development, as well as to sustainable implementation of educational change by using the educational materials they

  17. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems

  18. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  19. Savannah River Site environmental implementation plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  20. Savannah River Site Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1989-01-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period

  1. Savannah River Site Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  2. Implementation of a self-directed work team in a TLD Processing Center

    International Nuclear Information System (INIS)

    Arnwine, A.A.; Bogard, R.S.; Teasley, N.A.; Somers, D.E.; Souleyrette, M.L.

    1994-01-01

    In an effort to maintain productivity with a decreasing work force, the Oak Ridge Y-12 Plant has adopted the concept of Self-Directed Work Teams in various disciplines. The plant's Health Physics Department was able to eliminate a layer of front-line supervisors by establishing four self-directed work teams. Each team was able to choose their method of implementation. The TLD Processing Center Team chose to use project managment tools to ensure a smooth transition from the traditional work group to a self-directed approach. This process focused on establishing responsibilities, determining training requirements, determining a leadership style for the group, and performing a potential problem analysis for the transition. The transition also reviewed interface issues that could occur with upper management, matrix management, technical oversight, and organizational peers. The team's experience is also evaluated in comparison to other Self-Directed Work Teams

  3. Action plan for the communication process in a nursing team

    Directory of Open Access Journals (Sweden)

    Priscilla Valladares Broca

    2016-06-01

    Full Text Available The objective of this study is to propose an action plan for the communication process in the nursing team. The theoretical references were: the model of a communication process proposed by Berlo and essential concepts of King´s Theory. It is a qualitative, convergent-care research. The data production technique was the semi-structured interview with 25 nurses of a public hospital. Data used the thematic content analysis technique. The elements of the communication team are: perception, self, space, time, stress, role, authority, power, status, audience, empathy and nonverbal communication. The plan proposes a dynamic, flexible, interactive and relational communication process, in order to contribute to the professional qualification and make new practices of care viable. It was concluded that its elements do not have a fixed and stable position, but throughout the process they are used according to the needs of each party.

  4. Environmental protection implementation plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1998-03-01

    This Environmental Protection Implementation Plan is intended to ensure that the environmental program objectives of Department of Energy Order 5400.1 are achieved at SNL/California. This document states SNL/California's commitment to conduct its operations in an environmentally safe and responsible manner. The Environmental Protection Implementation Plan helps management and staff comply with applicable environmental responsibilities. SNL is committed to operating in full compliance with the letter and spirit of applicable environmental laws, regulations, and standards. Furthermore, SNL/California strives to go beyond compliance with legal requirements by making every effort practical to reduce impacts to the environment to levels as low as reasonably achievable

  5. Waste generator services implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999.

  6. Waste generator services implementation plan

    International Nuclear Information System (INIS)

    Mousseau, J.; Magleby, M.; Litus, M.

    1998-04-01

    Recurring waste management noncompliance problems have spurred a fundamental site-wide process revision to characterize and disposition wastes at the Idaho National Engineering and Environmental Laboratory. The reengineered method, termed Waste Generator Services, will streamline the waste acceptance process and provide waste generators comprehensive waste management services through a single, accountable organization to manage and disposition wastes in a timely, cost-effective, and compliant manner. This report outlines the strategy for implementing Waste Generator Services across the INEEL. It documents the culmination of efforts worked by the LMITCO Environmental Management Compliance Reengineering project team since October 1997. These efforts have included defining problems associated with the INEEL waste management process; identifying commercial best management practices; completing a review of DOE Complex-wide waste management training requirements; and involving others through an Integrated Process Team approach to provide recommendations on process flow, funding/charging mechanisms, and WGS organization. The report defines the work that will be performed by Waste Generator Services, the organization and resources, the waste acceptance process flow, the funding approach, methods for measuring performance, and the implementation schedule and approach. Field deployment will occur first at the Idaho Chemical Processing Plant in June 1998. Beginning in Fiscal Year 1999, Waste Generator Services will be deployed at the other major INEEL facilities in a phased approach, with implementation completed by March 1999

  7. 30 CFR 46.4 - Training plan implementation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Training plan implementation. 46.4 Section 46.4..., SURFACE CLAY, COLLOIDAL PHOSPHATE, OR SURFACE LIMESTONE MINES. § 46.4 Training plan implementation. (a... accordance with the written training plan; (2) Presented by a competent person; and (3) Presented in language...

  8. The Tiger Team Process in the Rebaselining of the Plutonium Finishing Plant (PFP)

    International Nuclear Information System (INIS)

    BAILEY, R.W.

    2000-01-01

    This paper will describe the integrated, teaming approach and planning process utilized by the Tiger Team in the development of the IPMP. This paper will also serve to document the benefits derived from this implementation process

  9. 340 Facility maintenance implementation plan

    International Nuclear Information System (INIS)

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements

  10. 340 Facility maintenance implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the 340 Facility. This plan is developed from the guidelines presented by Department of Energy (DOE) Order 4330.4B, Maintenance Management Program (DOE 1994), Chapter II. The objective of this plan is to provide baseline information for establishing and identifying Westinghouse Hanford Company (WHC) conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at the 340 Facility. Primary responsibility for the performance and oversight of maintenance activities at the 340 Facility resides with Westinghouse Hanford Company (WHC). Maintenance at the 340 Facility is performed by ICF-Kaiser Hanford (ICF-KH) South Programmatic Services crafts persons. This 340 Facility MIP provides interface requirements and responsibilities as they apply specifically to the 340 Facility. This document provides an implementation schedule which has been developed for items considered to be deficient or in need of improvement. The discussion sections, as applied to implementation at the 340 Facility, have been developed from a review of programs and practices utilizing the graded approach. Biennial review and additional reviews are conducted as significant programmatic and mission changes are made. This document is revised as necessary to maintain compliance with DOE requirements.

  11. The relevance of team characteristics and team directed strategies in the implementation of nursing innovations : A literature review

    NARCIS (Netherlands)

    Theo van Achterberg; Joke Mintjes; G. Holleman; E. Poot

    2009-01-01

    Implementation of innovations is a complex and intensive procedure in which different strategies can be successful. In nursing, strategies often focus on intrinsic motivation, competencies and attitudes of individual nurses while ignoring the social context. Since nurses often work in teams,

  12. Rapid improvement teams.

    Science.gov (United States)

    Alemi, F; Moore, S; Headrick, L; Neuhauser, D; Hekelman, F; Kizys, N

    1998-03-01

    Suggestions, most of which are supported by empirical studies, are provided on how total quality management (TQM) teams can be used to bring about faster organizationwide improvements. Ideas are offered on how to identify the right problem, have rapid meetings, plan rapidly, collect data rapidly, and make rapid whole-system changes. Suggestions for identifying the right problem include (1) postpone benchmarking when problems are obvious, (2) define the problem in terms of customer experience so as not to blame employees nor embed a solution in the problem statement, (3) communicate with the rest of the organization from the start, (4) state the problem from different perspectives, and (5) break large problems into smaller units. Suggestions for having rapid meetings include (1) choose a nonparticipating facilitator to expedite meetings, (2) meet with each team member before the team meeting, (3) postpone evaluation of ideas, and (4) rethink conclusions of a meeting before acting on them. Suggestions for rapid planning include reducing time spent on flowcharting by focusing on the future, not the present. Suggestions for rapid data collection include (1) sample patients for surveys, (2) rely on numerical estimates by process owners, and (3) plan for rapid data collection. Suggestions for rapid organizationwide implementation include (1) change membership on cross-functional teams, (2) get outside perspectives, (3) use unfolding storyboards, and (4) go beyond self-interest to motivate lasting change in the organization. Additional empirical investigations of time saved as a consequence of the strategies provided are needed. If organizations solve their problems rapidly, fewer unresolved problems may remain.

  13. Successful strategies in implementing a multidisciplinary team working in the care of patients with cancer: an overview and synthesis of the available literature

    Directory of Open Access Journals (Sweden)

    Soukup T

    2018-01-01

    Full Text Available Tayana Soukup,1 Benjamin W Lamb,2 Sonal Arora,3 Ara Darzi,3 Nick Sevdalis,1 James SA Green4,5 1Health Service and Population Research Department, Centre for Implementation Science, King’s College London, London, UK; 2Department of Surgical Oncology, Peter MacCallum Cancer Centre, Melbourne, VIC, Australia; 3Department of Surgery and Cancer, Center for Patient Safety and Service Quality, Imperial College London, 4Whipps Cross University Hospital, Barts Health NHS Trust, 5Faculty of Health and Social Care, London South Bank University, London, UK Abstract: In many health care systems globally, cancer care is driven by multidisciplinary cancer teams (MDTs. A large number of studies in the past few years and across different literature have been performed to better understand how these teams work and how they manage patient care. The aim of our literature review is to synthesize current scientific and clinical understanding on cancer MDTs and their organization; this, in turn, should provide an up-to-date summary of the current knowledge that those planning or leading cancer services can use as a guide for service implementation or improvement. We describe the characteristics of an effective MDT and factors that influence how these teams work. A range of factors pertaining to teamwork, availability of patient information, leadership, team and meeting management, and workload can affect how well MDTs are implemented within patient care. We also review how to assess and improve these teams. We present a range of instruments designed to be used with cancer MDTs – including observational tools, self-assessments, and checklists. We conclude with a practical outline of what appears to be the best practices to implement (Dos and practices to avoid (Don’ts when setting up MDT-driven cancer care. Keywords: cancer MDT, MDM, cancer meeting, patients with cancer

  14. Implementing Team-Based Learning in Middle School Social Studies Classes

    Science.gov (United States)

    Wanzek, Jeanne; Kent, Shawn C.; Vaughn, Sharon; Swanson, Elizabeth A.; Roberts, Greg; Haynes, Martha

    2015-01-01

    The authors examined the effects of team-based learning (TBL) implemented in Grade 8 social studies classes on student content acquisition. Twenty-four classes were randomly assigned to treatment or comparison blocking on teacher. In the treatment classes teachers integrated TBL practices in the content instruction. The authors examined teacher…

  15. Factors that hinder community participation in developing and implementing comprehensive council health plans in Manyoni District, Tanzania

    Directory of Open Access Journals (Sweden)

    Emmanuel G. Kilewo

    2015-06-01

    Full Text Available Background: Decentralization of public health planning is proposed to facilitate public participation in health issues. Health Sector Reform in Tanzania places emphasis on the participation of lower level health facilities and community in health planning process. Despite availability of policies, guidelines, and community representative organs, actual implementation of decentralization strategies is poorly achieved. This study intended to find out factors that hinder community participation in developing and implementing Comprehensive Council Health Plan (CCHP. Materials and methods: A qualitative approach was conducted in this study with key informants from Health Facility Governing Committees (HFGC, Council Health Service Board (CHSB, and Council Health Management Team (CHMT. Data were collected using in-depth interviews. Data generated were analyzed for themes and patterns. Results: Factors that hindered community participation included lack of awareness on the CCHP among HFGC members, poor communication and information sharing between CHMT and HFGC, unstipulated roles and responsibilities of HFGC, lack of management capacity among HFGC members, and lack of financial resources for implementing HFGC activities. Conclusions: The identified challenges call for policy makers to revisit the decentralization by devolution policy by ensuring that local governance structures have adequate resources as well as autonomy to participate in planning and managing CCHP in general and health facility plans in particular.

  16. Improving Interdisciplinary Relationships in Primary Care with the Implementation of TeamSTEPPS

    Directory of Open Access Journals (Sweden)

    Nicole Siddons

    2016-03-01

    Full Text Available A major challenge in healthcare is lack of interdisciplinary collaboration (O’Daniel & Rosenstein, 2008. The Institute of Medicine report, To Err is Human: Building a Safer Health System (1999, shows that errors often occur due to lapses in partnership and communication. This article describes the implementation of TeamSTEPPS, an evidence-based tool for optimizing staff relationships and partnership, in a clinic in which a change in the care model had affected interprofessional collaboration and teamwork, threatening healthcare outcomes and staff engagement. The implementation of TeamSTEPPS, customized using elements of IDEO’s (2015 Human-Centered Design, shifted the culture of the clinic towards partnership, resulting in improved staff perceptions of teamwork and statistically significant improvements in the quality of patient care.

  17. 76 FR 9706 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-02-22

    ... advance and available for prompt implementation once triggered. Section 110(k)(5) of the CAA provides that... Environmental protection, Air pollution control, Iowa, Particulate matter, State Implementation Plan. Dated...

  18. Intraprofessional, team-based treatment planning for oral health students in the comprehensive care clinic.

    Science.gov (United States)

    Mattheos, Nikos; Storrs, Mark; Foster, Lea; Oberholzer, Theunis

    2012-12-01

    In 2009, Griffith University School of Dentistry and Oral Health, in Queensland, Australia, introduced into its various curricula the concept of team-based treatment planning (TBTP), aiming to facilitate intraprofessional, interdisciplinary training and peer learning among its students. Fifty student teams were organized, each of which included students from three programs (Dental Science, Oral Health Therapy, and Dental Technology) and three years of study (third-, fourth-, and fifth-year students). This study prospectively evaluated the impact of TBTP on students' perceptions and attitudes towards teamwork and their role in a team of peers. A total of 202 students who participated in fifty TBTP teams were prospectively surveyed at baseline and at six and twelve months after introduction of TBTP. "Reliable" and "responsible" were reported to be the most important qualities of both an effective team leader and member. Fifth-year students identified "hard-working" as an important quality of the ideal leader as opposed to the fourth-year students who ranked "supportive" higher. Attitudes of the fifth-year students towards TBTP appeared to have declined significantly from the previous years, while fourth-year students remained consistently more positive. In addition, fourth-year students appeared more likely to enjoy working in a team and considered themselves more effective in a team. No gender differences were observed, other than female students' appearing less confident to lead a team. It was concluded that the function of student-directed interdisciplinary, intraprofessional treatment planning teams might pose disproportionate strain on fifth-year students, impacting their attitudes to such modes of work.

  19. Level-2 Milestone 5588: Deliver Strategic Plan and Initial Scalability Assessment by Advanced Architecture and Portability Specialists Team

    Energy Technology Data Exchange (ETDEWEB)

    Draeger, Erik W. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2016-09-30

    This report documents the fact that the work in creating a strategic plan and beginning customer engagements has been completed. The description of milestone is: The newly formed advanced architecture and portability specialists (AAPS) team will develop a strategic plan to meet the goals of 1) sharing knowledge and experience with code teams to ensure that ASC codes run well on new architectures, and 2) supplying skilled computational scientists to put the strategy into practice. The plan will be delivered to ASC management in the first quarter. By the fourth quarter, the team will identify their first customers within PEM and IC, perform an initial assessment and scalability and performance bottleneck for next-generation architectures, and embed AAPS team members with customer code teams to assist with initial portability development within standalone kernels or proxy applications.

  20. Implementing the Climate Action Plan | Climate Neutral Research Campuses |

    Science.gov (United States)

    considerations for building a portfolio, including: Compatibility with organizational mission: All climate NREL Implementing the Climate Action Plan Implementing the Climate Action Plan When implementing climate action plans on research campuses, two important and related questions must be answered

  1. Sector activities and lessons learned around initial implementation of the United States national physical activity plan.

    Science.gov (United States)

    Evenson, Kelly R; Satinsky, Sara B

    2014-08-01

    National plans are increasingly common but infrequently evaluated. The 2010 United States National Physical Activity Plan (NPAP) provided strategies to increase population levels of physical activity. This paper describes (i) the initial accomplishments of the NPAP sector teams, and (ii) results from a process evaluation to determine how the sectors operated, their cross-sector collaboration, challenges encountered, and positive experiences. During 2011, a quarterly reporting system was developed to capture sector-level activities. A year-end interview derived more detailed information. Interviews with 12 sector leads were recorded, transcribed verbatim, and analyzed for common themes. The 6 sectors worked on goals from the implementation plan that focused broadly on education, promotion, intervention, policy, collaboration, and evaluation. Through year-end interviews, themes were generated around operations, goal setting, and cross-sector collaboration. Challenges to the NPAP work included lack of funding and time, the need for marketing and promotion, and organizational support. Positive experiences included collaboration, efficiency of work, enhanced community dynamic, and accomplishments toward NPAP goals. These initial results on the NPAP sector teams can be used as a baseline assessment for future monitoring. The lessons learned may be useful to other practitioners developing evaluations around state- or national-level plans.

  2. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment

    International Nuclear Information System (INIS)

    1991-01-01

    This report presents a complete response to the Tiger Team assessment that was conducted to Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 2, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root cause of the findings identified during the assessment. This report is concerned with reactors safety and health findings, responses, and planned actions. Specific areas include: organization and administration; quality verification; operations; maintenance; training and certification; auxiliary systems; emergency preparedness; technical support; nuclear criticality safety; security/safety interface; experimental activities; site/facility safety review; radiological protection; personnel protection; fire protection; management findings, responses, and planned actions; self-assessment findings, responses, and planned actions; and summary of planned actions, schedules, and costs

  3. Westinghouse Hanford Company Pollution Prevention Program Implementation Plan

    International Nuclear Information System (INIS)

    Floyd, B.C.

    1994-10-01

    This plan documents Westinghouse Hanford Company's (WHC) Pollution Prevention (P2) (formerly Waste Minimization) program. The program includes WHC; BCS Richland, Inc. (BCSR); and ICF Kaiser Hanford Company (ICF KH). The plan specifies P2 program activities and schedules for implementing the Hanford Site Waste Minimization and Pollution Prevention Awareness (WMin/P2) Program Plan requirements (DOE 1994a). It is intended to satisfy the U.S. Department of Energy (DOE) and other legal requirements that are discussed in both the Hanford Site WMin/P2 plan and paragraph C of this plan. As such, the Pollution Prevention Awareness Program required by DOE Order 5400.1 (DOE 1988) is included in the WHC P2 program. WHC, BCSR, and ICF KH are committed to implementing an effective P2 program as identified in the Hanford Site WMin/P2 Plan. This plan provides specific information on how the WHC P2 program will develop and implement the goals, activities, and budget needed to accomplish this. The emphasis has been to provide detailed planning of the WHC P2 program activities over the next 3 years. The plan will guide the development and implementation of the program. The plan also provides background information on past program activities. Because the plan contains greater detail than in the past, activity scope and implementation schedules may change as new priorities are identified and new approaches are developed and realized. Some activities will be accelerated, others may be delayed; however, all of the general program elements identified in this plan and contractor requirements identified in the Site WMin/P2 plan will be developed and implemented during the next 3 years. This plan applies to all WHC, BCSR, and ICF KH organizations and subcontractors. It will be distributed to those with defined responsibilities in this plan; and the policy, goals, objectives, and strategy of the program will be communicated to all WHC, BCSR, and ICF KH employees

  4. 78 FR 41731 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-07-11

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9830-5] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four Corners Power... Implementation Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional...

  5. Team responsibility structure and team performance

    NARCIS (Netherlands)

    Doorewaard, J.A.C.M.; Hootegem, G. van; Huys, R.

    2002-01-01

    The purpose is to analyse the impact of team responsibility (the division of job regulation tasks between team leader and team members) on team performance. It bases an analysis on 36 case studies in The Netherlands which are known to have implemented team‐based work. The case studies were executed

  6. Bechtel Hanford, Inc./ERC team health and safety plan Environmental Restoration Disposal Facility operations

    International Nuclear Information System (INIS)

    Turney, S.R.

    1996-02-01

    A comprehensive safety and health program is essential for reducing work-related injuries and illnesses while maintaining a safe and health work environment. This document establishes Bechtel Hanford, Inc. (BHI)/Environmental Restoration Contractor (ERC) team requirements, policies, and procedures and provides preliminary guidance to the Environmental Restoration Disposal Facility (ERDF) subcontractor for use in preparing essential safety and health documents. This health and safety plan (HASP) defines potential safety and health issues associated with operating and maintaining the ERDF. A site-specific HASP shall be developed by the ERDF subcontractor and shall be implemented before operations and maintenance work can proceed. An activity hazard analysis (AHA) shall also be developed to provide procedures to identify, assess, and control hazards or potential incidents associated with specific operations and maintenance activities

  7. Environmental Implementation Plan

    International Nuclear Information System (INIS)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ''Partnership in Environmental Excellence'' formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex

  8. Environmental Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are being made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.

  9. Creating and supporting a mixed methods health services research team.

    Science.gov (United States)

    Bowers, Barbara; Cohen, Lauren W; Elliot, Amy E; Grabowski, David C; Fishman, Nancy W; Sharkey, Siobhan S; Zimmerman, Sheryl; Horn, Susan D; Kemper, Peter

    2013-12-01

    To use the experience from a health services research evaluation to provide guidance in team development for mixed methods research. The Research Initiative Valuing Eldercare (THRIVE) team was organized by the Robert Wood Johnson Foundation to evaluate The Green House nursing home culture change program. This article describes the development of the research team and provides insights into how funders might engage with mixed methods research teams to maximize the value of the team. Like many mixed methods collaborations, the THRIVE team consisted of researchers from diverse disciplines, embracing diverse methodologies, and operating under a framework of nonhierarchical, shared leadership that required new collaborations, engagement, and commitment in the context of finite resources. Strategies to overcome these potential obstacles and achieve success included implementation of a Coordinating Center, dedicated time for planning and collaborating across researchers and methodologies, funded support for in-person meetings, and creative optimization of resources. Challenges are inevitably present in the formation and operation of effective mixed methods research teams. However, funders and research teams can implement strategies to promote success. © Health Research and Educational Trust.

  10. Implementation of consumer providers into mental health intensive case management teams.

    Science.gov (United States)

    Hamilton, Alison B; Chinman, Matthew; Cohen, Amy N; Oberman, Rebecca Shoai; Young, Alexander S

    2015-01-01

    In mental health care, consumer providers (CPs) are individuals with serious mental illness (SMI) who draw upon their lived experiences while providing services to others with SMI. Implementation of CPs has proven to be challenging in a variety of settings. The PEER project (Peers Enhancing Recovery) involved rolling out CPs using an implementation science model and evaluating implementation and impact in mental health treatment settings (three intervention, three control). In qualitative interviews, facilitators and challenges to implementation were described by the CPs, their team members, clients, and study researchers. Site preparation, external facilitation, and positive, reinforcing experiences with CPs facilitated implementation. Role definitions and deficiencies in CPs' technical knowledge posed challenges to implementation. Sustainability was not realized due to insufficient resources. However, implementation was positive overall, characterized by diffusion of innovation concepts of high relative advantage, strong trialability, compatibility with prevailing norms, compelling observability, and relatively low complexity. By preparing and working systematically with intervention sites to incorporate new services, implementation was strengthened and challenges were minimized.

  11. Planning a pharmacy-led medical mission trip, part 2: servant leadership and team dynamics.

    Science.gov (United States)

    Brown, Dana A; Brown, Daniel L; Yocum, Christine K

    2012-06-01

    While pharmacy curricula can prepare students for the cognitive domains of pharmacy practice, mastery of the affective aspects can prove to be more challenging. At the Gregory School of Pharmacy, medical mission trips have been highly effective means of impacting student attitudes and beliefs. Specifically, these trips have led to transformational changes in student leadership capacity, turning an act of service into an act of influence. Additionally, building team unity is invaluable to the overall effectiveness of the trip. Pre-trip preparation for teams includes activities such as routine team meetings, team-building activities, and implementation of committees, as a means of promoting positive team dynamics. While in the field, team dynamics can be fostered through activities such as daily debriefing sessions, team disclosure times, and provision of medical services.

  12. Quality assurance of HDR prostate plans: Program implementation at a community hospital

    International Nuclear Information System (INIS)

    Rush, Jennifer B.; Thomas, Michael D.

    2005-01-01

    Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%

  13. Quality assurance of HDR prostate plans: program implementation at a community hospital.

    Science.gov (United States)

    Rush, Jennifer B; Thomas, Michael D

    2005-01-01

    Adenocarcinoma of the prostate is currently the most commonly diagnosed cancer in men in the United States, and the second leading cause of cancer mortality. The utilization of radiation therapy is regarded as the definitive local therapy of choice for intermediate- and high-risk disease, in which there is increased risk for extracapsular extension, seminal vesicle invasion, or regional node involvement. High-dose-rate (HDR) brachytherapy is a logical treatment modality to deliver the boost dose to an external beam radiation therapy (EBRT) treatment to increase local control rates. From a treatment perspective, the utilization of a complicated treatment delivery system, the compressed time frame in which the procedure is performed, and the small number of large dose fractions make the implementation of a comprehensive quality assurance (QA) program imperative. One aspect of this program is the QA of the HDR treatment plan. Review of regulatory and medical physics professional publications shows that substantial general guidance is available. We provide some insight to the implementation of an HDR prostate plan program at a community hospital. One aspect addressed is the utilization of the low-dose-rate (LDR) planning system and the use of existing ultrasound image sets to familiarize the radiation therapy team with respect to acceptable HDR implant geometries. Additionally, the use of the LDR treatment planning system provided a means to prospectively determine the relationship between the treated isodose volume and the product of activity and time for the department's planning protocol prior to the first HDR implant. For the first 12 HDR prostate implants, the root-mean-square (RMS) deviation was 3.05% between the predicted product of activity and time vs. the actual plan values. Retrospective re-evaluation of the actual implant data reduced the RMS deviation to 2.36%.

  14. [Developing team reflexivity as a learning and working tool for medical teams].

    Science.gov (United States)

    Riskin, Arieh; Bamberger, Peter

    2014-01-01

    Team reflexivity is a collective activity in which team members review their previous work, and develop ideas on how to modify their work behavior in order to achieve better future results. It is an important learning tool and a key factor in explaining the varying effectiveness of teams. Team reflexivity encompasses both self-awareness and agency, and includes three main activities: reflection, planning, and adaptation. The model of briefing-debriefing cycles promotes team reflexivity. Its key elements include: Pre-action briefing--setting objectives, roles, and strategies the mission, as well as proposing adaptations based on what was previously learnt from similar procedures; Post-action debriefing--reflecting on the procedure performed and reviewing the extent to which objectives were met, and what can be learnt for future tasks. Given the widespread attention to team-based work systems and organizational learning, efforts should be made toward ntroducing team reflexivity in health administration systems. Implementation could be difficult because most teams in hospitals are short-lived action teams formed for a particular event, with limited time and opportunity to consciously reflect upon their actions. But it is precisely in these contexts that reflexive processes have the most to offer instead of the natural impulsive collective logics. Team reflexivity suggests a potential solution to the major problems of iatorgenesis--avoidable medical errors, as it forces all team members to participate in a reflexive process together. Briefing-debriefing technology was studied mainly in surgical teams and was shown to enhance team-based learning and to improve quality-related outcomes and safety.

  15. Oracle accrual plans from requirements to implementation

    Energy Technology Data Exchange (ETDEWEB)

    Rivera, Christine K [Los Alamos National Laboratory

    2009-01-01

    Implementing any new business software can be an intimidating prospect and this paper is intended to offer some insight in to how to approach this challenge with some fundamental rules for success. Los Alamos National Laboratory (LANL) had undergone an original ERP implementation of HRMS, Oracle Advanced Benefits, Worker Self Service, Manager Self Service, Project Accounting, Financials and PO, and recently completed a project to implement Oracle Payroll, Time and Labor and Accrual Plans. This paper will describe some of the important lessons that can be applied to any implementation as a whole, and then specifically how this knowledge was applied to the design and deployment of Oracle Accrual Plans for LANL. Finally, detail on the functionality available in Oracle Accrual Plans will be described, as well as the detailed setups.that were utilized at LANL.

  16. Strategic planning--a plan for excellence for South Haven Health System.

    Science.gov (United States)

    Urbanski, Joanne; Baskel, Maureen; Martelli, Mary

    2011-01-01

    South Haven Health System has developed an innovative approach to strategic planning. The key to success of this process has been the multidisciplinary involvement of all stakeholders from the first planning session through the final formation of a strategic plan with measurable objectives for each goal. The process utilizes a Conversation Café method for identifying opportunities and establishing goals, Strategic Oversight Teams to address each goal and a Champion for implementation of each objective. Progress is measured quarterly by Strategic Oversight Team report cards. Transparency of communication within the organization and the sharing of information move the plan forward. The feedback from participant evaluations has been overwhelmingly positive. They are involved and excited.

  17. Project implementation plan: ASTD remote deployment

    International Nuclear Information System (INIS)

    CRASS, D.W.

    1999-01-01

    This document is the project implementation plan for the ASTD Remote Deployment Project. The Plan identifies the roles and responsibilities for the project and defines the integration between the ASTD Project and the B-Cell Cleanout Project

  18. 78 FR 60700 - Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology...

    Science.gov (United States)

    2013-10-02

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 49 [EPA-R09-OAR-2013-0489; FRL-9901-58-Region 9] Source Specific Federal Implementation Plan for Implementing Best Available Retrofit Technology for Four... Plan (FIP) to implement the Best Available Retrofit Technology (BART) requirement of the Regional Haze...

  19. Implementing healthy lifestyle promotion in primary care: a quasi-experimental cross-sectional study evaluating a team initiative.

    Science.gov (United States)

    Thomas, Kristin; Krevers, Barbro; Bendtsen, Preben

    2015-01-22

    Non-communicable diseases are a leading cause of death and can largely be prevented by healthy lifestyles. Health care organizations are encouraged to integrate healthy lifestyle promotion in routine care. This study evaluates the impact of a team initiative on healthy lifestyle promotion in primary care. A quasi-experimental, cross-sectional design compared three intervention centres that had implemented lifestyle teams with three control centres that used a traditional model of care. Outcomes were defined using the RE-AIM framework: reach, the proportion of patients receiving lifestyle promotion; effectiveness, self-reported attitudes and competency among staff; adoption, proportion of staff reporting regular practice of lifestyle promotion; implementation, fidelity to the original lifestyle team protocol. Data collection methods included a patient questionnaire (n = 888), a staff questionnaire (n = 120) and structured interviews with all practice managers and, where applicable, team managers (n = 8). The chi square test and problem-driven content analysis was used to analyse the questionnaire and interview data, respectively. Reach: patients at control centres (48%, n = 211) received lifestyle promotion significantly more often compared with patients at intervention centres (41%, n = 169). Effectiveness: intervention staff was significantly more positive towards the effectiveness of lifestyle promotion, shared competency and how lifestyle promotion was prioritized at their centre. Adoption: 47% of staff at intervention centres and 58% at control centres reported that they asked patients about their lifestyle on a daily basis. all intervention centres had implemented multi-professional teams and team managers and held regular meetings but struggled to implement in-house referral structures for lifestyle promotion, which was used consistently among staff. Intervention centres did not show higher rates than control centres on reach of patients

  20. Barriers and facilitators to the implementation of a paediatric palliative care team

    NARCIS (Netherlands)

    Verberne, Lisa M; Kars, Marijke C; Schepers, Sasja A; Schouten-van Meeteren, Antoinette Y N; Grootenhuis, Martha A; van Delden, Johannes J M

    2018-01-01

    BACKGROUND: Over the last decade, paediatric palliative care teams (PPCTs) have been introduced to support children with life-limiting diseases and their families and to ensure continuity, coordination and quality of paediatric palliative care (PPC). However, implementing a PPCT into an organisation

  1. Barriers and facilitators to the implementation of a paediatric palliative care team

    NARCIS (Netherlands)

    Verberne, Lisa M.; Kars, Marijke C.; Schepers, Sasja A.; Schouten-van Meeteren, Antoinette Y. N.; Grootenhuis, Martha A.; van Delden, Johannes J. M.

    2018-01-01

    Over the last decade, paediatric palliative care teams (PPCTs) have been introduced to support children with life-limiting diseases and their families and to ensure continuity, coordination and quality of paediatric palliative care (PPC). However, implementing a PPCT into an organisation is a

  2. The implementation of school-based lesson study at elementary school

    Directory of Open Access Journals (Sweden)

    Purnomo Purnomo

    2017-07-01

    Full Text Available This study aims to describe and interpret the implementation of school-based lesson study in SDN I Kretek. This study uses the qualitative research. The data were collected through in-depth interviews, participant observation, field notes, and documentation. The data validity was determined through sources and techniques triangulation. The data were analyzed using the Interactive Analysis Model from Miles and Huberman. The results show: (1 the planning of school-based lesson study program at SDN 1 Kretek has been implemented from the beginning of the school year 2014/2015 by establishing school-based lesson study team. This team is responsible for planning, managing, and evaluating school-based lesson study program at SDN 1 Kretek, (2 school-based lesson study at SDN 1 Kretek is implemented in three phases, namely planning, implementation, and reflection, and (3 The evaluation of lesson study is conducted by each teacher who has conducted the open class and conducted thoroughly with a meeting by a team of school-based lesson study SDN 1 Kretek at the end of the school year.

  3. Shaping the Culture: Organizational Development through Team Building.

    Science.gov (United States)

    Yeager, James F.

    This practicum developed and implemented an organization development plan to improve agency and team effectiveness and staff satisfaction at a private agency that provides educational and treatment services to children with emotional, mental, or behavioral disorders. An extensive literature review on organizational development was conducted and…

  4. New model of enterprises resource planning implementation planning process in manufacturing enterprises

    Directory of Open Access Journals (Sweden)

    Mirjana Misita

    2016-05-01

    Full Text Available This article presents new model of enterprises resource planning implementation planning process in manufacturing enterprises based on assessment of risk sources. This assessment was performed by applying analytic hierarchy process. Analytic hierarchy process method allows variation of relative importance of specific risk sources dependent on the section from which the risk source originates (organizational environment, technical issues, people issues, adoption process management, and external support. Survey was conducted on 85 manufacturing enterprises involved with an enterprises resource planning solution. Ranking of risk sources assessments returns most frequent risks of enterprises resource planning implementation success in manufacturing enterprises, and representative factors were isolated through factor analysis by risk source origin. Finally, results indicate that there are hidden causes of failed implementation, for example, risk source “top management training and education,” from risk origin “adoption process management.”

  5. Implementation and consistency of Heart Team decision-making in complex coronary revascularisation.

    Science.gov (United States)

    Pavlidis, Antonis N; Perera, Divaka; Karamasis, Grigoris V; Bapat, Vinayak; Young, Chris; Clapp, Brian R; Blauth, Chris; Roxburgh, James; Thomas, Martyn R; Redwood, Simon R

    2016-03-01

    A multidisciplinary team (MDT) approach for decision-making in patients with complex coronary artery disease (CAD) is now a class IC recommendation in the European and American guidelines for myocardial revascularisation. The aim of this study was to evaluate the implementation and consistency of Heart Team HT decision-making in complex coronary revascularisation. We prospectively evaluated the data of 399 patients derived from 51 consecutive MDT meetings held in a tertiary cardiac centre. A subset of cases was randomly selected and re-presented with the same clinical data to a panel blinded to the initial outcome, at least 6 months after the initial discussion, in order to evaluate the reproducibility of decision-making. The most common decisions included continued medical management (30%), coronary artery bypass grafting (CABG) (26%) and percutaneous coronary intervention (PCI) (17%). Other decisions, such as further assessment of symptoms or evaluation with further invasive or non-invasive tests were made in 25% of the cases. Decisions were implemented in 93% of the cases. On re-discussion of the same data (n=40) within a median period of 9 months 80% of the initial HT recommendations were successfully reproduced. The Heart Team is a robust process in the management of patient with complex CAD and decisions are largely reproducible. Although outcomes are successfully implemented in the majority of the cases, it is important that all clinical information is available during discussion and patient preference is taken into account. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  6. Extra-team connections for knowledge transfer between staff teams

    Science.gov (United States)

    Ramanadhan, Shoba; Wiecha, Jean L.; Emmons, Karen M.; Gortmaker, Steven L.; Viswanath, Kasisomayajula

    2009-01-01

    As organizations implement novel health promotion programs across multiple sites, they face great challenges related to knowledge management. Staff social networks may be a useful medium for transferring program-related knowledge in multi-site implementation efforts. To study this potential, we focused on the role of extra-team connections (ties between staff members based in different site teams) as potential channels for knowledge sharing. Data come from a cross-sectional study of afterschool childcare staff implementing a health promotion program at 20 urban sites of the Young Men's Christian Association of Greater Boston. We conducted a sociometric social network analysis and attempted a census of 91 program staff members. We surveyed 80 individuals, and included 73 coordinators and general staff, who lead and support implementation, respectively, in this study. A multiple linear regression model demonstrated a positive relationship between extra-team connections (β = 3.41, P knowledge transfer. We also found that intra-team connections (within-team ties between staff members) were also positively related to skill receipt. Connections between teams appear to support knowledge transfer in this network, but likely require greater active facilitation, perhaps via organizational changes. Further research on extra-team connections and knowledge transfer in low-resource, high turnover environments is needed. PMID:19528313

  7. Staff turnover in statewide implementation of ACT: relationship with ACT fidelity and other team characteristics

    OpenAIRE

    Rollins, Angela L.; Salyers, Michelle P.; Tsai, Jack; Lydick, Jennifer M.

    2010-01-01

    Staff turnover on assertive community treatment (ACT) teams is a poorly understood phenomenon. This study examined annual turnover and fidelity data collected in a statewide implementation of ACT over a 5-year period. Mean annual staff turnover across all observations was 30.0%. Turnover was negatively correlated with overall fidelity at Year 1 and 3. The team approach fidelity item was negatively correlated with staff turnover at Year 3. For 13 teams with 3 years of follow-up data, turnover ...

  8. SEPARATIONS AND WASTE FORMS CAMPAIGN IMPLEMENTATION PLAN

    Energy Technology Data Exchange (ETDEWEB)

    Vienna, John D.; Todd, Terry A.; Peterson, Mary E.

    2012-11-26

    This Separations and Waste Forms Campaign Implementation Plan provides summary level detail describing how the Campaign will achieve the objectives set-forth by the Fuel Cycle Reasearch and Development (FCRD) Program. This implementation plan will be maintained as a living document and will be updated as needed in response to changes or progress in separations and waste forms research and the FCRD Program priorities.

  9. Planning ahead: Improving escalation plans before the weekend.

    Science.gov (United States)

    Zarkali, Angeliki; Black, Duncan; Smee, Elizabeth; Deshraj, Anshul; Smallwood, Nicholas

    2014-01-01

    Handover is the system by which responsibility for patient care is transferred between healthcare professionals. A significant aspect of handover is the existence of an escalation plan for each patient in case of deterioration over the weekend. According to the Royal College of Physicians, all patients should have a clear escalation plan documented in the notes before a weekend, since parent medical teams (Consultant team in charge of care) are best placed to make these decisions. If left to on-call teams, at a time of deterioration over a weekend, they might not have all available information, the patient might be unable to be involved in the decisions, and the family might not be consulted. With this is mind, we decided to analyse the existing handover process in a medium sized district general hospital, with the aim of improving the process and the documentation of escalation plans. The results from our retrospective analysis of the system in place revealed a significant lack of documentation of escalation plans in the medical notes. Three sample wards were selected to analyse the current handover system and test proposed measures before hospital-wide implementation. After trialling of a physical handover meeting in addition to the existing intranet system and a proforma for the Friday ward round, the documentation of escalation plans in the patients' notes improved from 9.1% to 41.1%. Based on these results, as well as formal feedback from junior doctors and informal feedback from other staff, the physical handover meeting and Friday ward round proforma will be implemented throughout the Trust. Our interventions led to an improvement in the documentation of escalation plans in our hospital, thus saving precious time in the event of a patient's deterioration. This also ensures that families and patients are involved in the decision making process and kept informed, and reduces the burden for the weekend on-call teams.

  10. Occupational therapists in the interdisciplinary team setting.

    Science.gov (United States)

    Reed, S M

    1984-01-01

    The interdisciplinary team approach to patient care provides an answer to the fragmentation and confusion patients feel when dealing with our complex healthcare system. Even though the team approach has been in use for the past two decades, implementation of a successful team is very difficult and rarely sustained over a significant period of time. This is especially true in general hospitals and in physical rehabilitation programs that spring from general hospitals where the physician and the nurse are the traditional care group. Occupational therapists, as they establish roles on interdisciplinary teams as staff members and team leaders, will require a knowledge of what makes a team function effectively. They can use this knowledge to evaluate the status of their own team and contribute to changes that will insure its long-term success. Six key issues should be addressed during the planning stage of any new healthcare team to insure its continued viability. These issues are: program philosophy, client focus, role clarification, collaboration and information sharing, policies and procedures, and staff supportiveness.

  11. Pinellas Plant FY1990 site specific implementation plan

    International Nuclear Information System (INIS)

    Klein, R.D.

    1990-02-01

    This Site Specific Implementation Plan describes the Corrective Action, Environmental Restoration, and Waste Management activities to be performed at the Pinellas Plant in FY1990 (October 1, 1989 to September 30, 1989). These FY1990 activities are described in the Pinellas Plant FY1991--95 Five-Year Plan. The information used to prepare this plan reflects the best estimate of the project scope, schedules, regulatory, and funding requirements at the time of plan preparation. The Environmental Restoration/Waste Management Five-Year Plan is a dynamic document and will be modified each year; the Site Specific Implementation Plan will, in turn, be modified each year to reflect new findings, information, and knowledge of the various projects. 4 figs., 11 tabs

  12. Chicago-St. Louis high speed rail plan

    International Nuclear Information System (INIS)

    Stead, M.E.

    1994-01-01

    The Illinois Department of Transportation (IDOT), in cooperation with Amtrak, undertook the Chicago-St. Louis High Speed Rail Financial and Implementation Plan study in order to develop a realistic and achievable blueprint for implementation of high speed rail in the Chicago-St. Louis corridor. This report presents a summary of the Price Waterhouse Project Team's analysis and the Financial and Implementation Plan for implementing high speed rail service in the Chicago-St. Louis corridor

  13. Tiger team findings related to DOE environmental restoration activities

    International Nuclear Information System (INIS)

    Levitan, W.M.

    1991-01-01

    Tiger Team Assessments were implemented in June 1989 as part of a strategy to ensure that DOE facilities fully comply with Federal, state, local and DOE environment, safety, and health (ES ampersand H) requirements. The Tiger Teams provide the Secretary of Energy with information on current ES ampersand H compliance status of each DOE facility and causes for noncompliance. To date, Tiger Team Assessments have been completed at 25 DOE facilities. With regard to assessments of environmental restoration activities, the performance of DOE facilities was evaluated against the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended, the National Contingency Plan (NCP), and DOE Order 5400.4, CERCLA Requirements, among others. Five major categories of environmental restoration-related findings were identified: (1) environmental restoration program planning and management (found at 60 percent of the sites assessed); (2) community relations/administrative record (60 percent); (3) characterization of extent of contamination (56 percent); (4) identification and evaluation of inactive waste sites (56 percent); and (5) DOE and NCP requirements for response action studies (44 percent). Primary causal factors for these findings were inadequate procedures, resources, supervision, and policy implementation

  14. Study On Safeguard Measures for Implementing Overall Planning of Land Use

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    Based on minutely analysing the main problems existing in safeguard measures for implementing a new round of overall planning of land use,this paper constructs implementation security system of overall planning of land use,and puts forward the principles and basis of formulating safeguard measures for implementing overall planning of land use.Finally,this paper establishes the content system of safeguard measures:effectively strengthen social supervision;strengthen administrative management of land use planning;strengthen economic management of land use planning;reinforce the legal status of planning;establish incentive and constraint mechanism for reinforcing implementation;improve support system of planning.

  15. Better team management--better team care?

    Science.gov (United States)

    Shelley, P; Powney, B

    1994-01-01

    Team building should not be a 'bolt-on' extra, it should be a well planned, integrated part of developing teams and assisting their leaders. When asked to facilitate team building by a group of NHS managers we developed a framework which enabled individual members of staff to become more effective in the way they communicated with each other, their teams and in turn within the organization. Facing the challenge posed by complex organizational changes, staff were able to use 3 training days to increase and develop their awareness of the principles of teamwork, better team management, and how a process of leadership and team building could help yield better patient care.

  16. Implementing Strategic Environmental Assessment of spatial planning tools

    International Nuclear Information System (INIS)

    De Montis, Andrea

    2013-01-01

    After more than a decade from the publication of the European Directive 2001/42/CE (Directive) on Strategic Environmental Assessment (SEA), the design and construction of the interested spatial planning instruments has gone through a variety of changes and integrations in European and in world states. This inhomogeneous panorama can be explained with a pattern of institutional structures that have so far affected the implementation of the Directive. The aim of this paper is to investigate the level of implementation of the Directive in Italy by developing a comparative analysis of the quality of integration of SEA within the design of the spatial coordination plan of a set of Italian provinces. Italian practice is analyzed in the framework of a comparative study of worldwide SEA implementation within spatial and land use planning. The results reveal strengths and weaknesses in SEA implementation at the provincial level and, in particular, the emergence of critical areas of research concerning institutional context, public participation, monitoring, and observatory of the spatial transformations. -- Highlights: • This is a comparative analysis of SEA in strategic spatial planning in Italy. • The adhesion of Provinces to the study is remarkable. • SEA implementation and integration into spatial planning is still moderate. • Participation via consultations should be more widespread. • Monitoring and institution of observatories are still in an infancy stage

  17. SU-C-BRD-02: A Team Focused Clinical Implementation and Failure Mode and Effects Analysis of HDR Skin Brachytherapy Using Valencia and Leipzig Surface Applicators

    International Nuclear Information System (INIS)

    Sayler, E; Harrison, A; Eldredge-Hindy, H; Dinome, J; Munro, S; Anne, R; Comber, E; Lockamy, V

    2014-01-01

    Purpose: and Leipzig applicators (VLAs) are single-channel brachytherapy surface applicators used to treat skin lesions up to 2cm diameter. Source dwell times can be calculated and entered manually after clinical set-up or ultrasound. This procedure differs dramatically from CT-based planning; the novelty and unfamiliarity could lead to severe errors. To build layers of safety and ensure quality, a multidisciplinary team created a protocol and applied Failure Modes and Effects Analysis (FMEA) to the clinical procedure for HDR VLA skin treatments. Methods: team including physicists, physicians, nurses, therapists, residents, and administration developed a clinical procedure for VLA treatment. The procedure was evaluated using FMEA. Failure modes were identified and scored by severity, occurrence, and detection. The clinical procedure was revised to address high-scoring process nodes. Results: Several key components were added to the clinical procedure to minimize risk probability numbers (RPN): -Treatments are reviewed at weekly QA rounds, where physicians discuss diagnosis, prescription, applicator selection, and set-up. Peer review reduces the likelihood of an inappropriate treatment regime. -A template for HDR skin treatments was established in the clinical EMR system to standardize treatment instructions. This reduces the chances of miscommunication between the physician and planning physicist, and increases the detectability of an error during the physics second check. -A screen check was implemented during the second check to increase detectability of an error. -To reduce error probability, the treatment plan worksheet was designed to display plan parameters in a format visually similar to the treatment console display. This facilitates data entry and verification. -VLAs are color-coded and labeled to match the EMR prescriptions, which simplifies in-room selection and verification. Conclusion: Multidisciplinary planning and FMEA increased delectability and

  18. Planning and implementing an implanted fiducial programme for prostate cancer radiation therapy

    International Nuclear Information System (INIS)

    Thompson, A.; Owen, R.; Laferlita, M.; Fox, C.; Foroudi, F.; Tai, K. H.; Styles, C.

    2008-01-01

    Full text: Using implanted gold seeds as fiducial markers to verify the position of the prostate in radiation therapy is well accepted and is becoming the standard of practice and requirement for international multicentre trials. In 2006 the decision was made at the Peter MacCallum Caner Centre (Peter Mac) to plan for and implement this process as standard clinical practice for radical dose prostate treatments (74-78 Gy). Before this, programme verification of field placement for prostate cancer radiation treatment was routinely carried out using regular off-line electronic portal imaging with matching of bony anatomy. A small multidisciplinary team investigated and assisted in the implementation of this new practice across the Peter Mac sites at East Melbourne and our three satellite centres. Issues considered included seed size, number and position in the prostate, implant equipment, imaging equipment and procedure and consent and information forms. The use of a custom made fiducial pack, comprehensive patient information and a daily on-line imaging process was implemented. The experience of the first 28 patients at Peter Mac from January 2007 to May 2007 inclusive is reported on.

  19. The implementation of Just In Time manufacturing through team leaders

    OpenAIRE

    Carr, P. D.

    1995-01-01

    This thesis examines the implementation of Just In Time manufacturing through team leaders. Western industry has failed to achieve the performance benefits experienced in Japan with the introduction of Just In Time, a manufacturing system based on the relentless elimination of waste. Criticism is emerging of the experience of employees of Just In Time. It is argued that stress levels are high and motivation is low. However, Just In Time relies on a new, more active, role for em...

  20. The Automated Assembly Team contributions to the APRIMED Agile Manufacturing Project

    International Nuclear Information System (INIS)

    Jones, R.E.; Ames, A.L.; Calton, T.L.

    1995-06-01

    The Automated Assembly Team of the APRIMED Project (abbreviated as A') consists of two parts: the Archimedes Project, which is an ongoing project developing automated assembly technology, and the A' Robot Team. Archimedes is a second generation assembly planning system that both provides a general high-level assembly sequencing capability and, for a smaller class of products, facilitates automatic programming of a robotic workcell to assemble them. The A' robot team designed, developed, and implemented a flexible robot workcell which served as the automated factory of the A' project. In this document we briefly describe the role of automated assembly planning in agile manufacturing, and specifically describe the contributions of the Archimedes project and the A' robot team to the A' project. We introduce the concepts of the Archimedes automated assembly planning project, and discuss the enhancements to Archimedes which were developed in response to the needs of the A' project. We also present the work of the A' robot team in designing and developing the A' robot workcell, including all tooling and programming to support assembly of the A' discriminator devices. Finally, we discuss the process changes which these technologies have enabled in the A' project

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. Asian Tracer Experiment and Atmospheric Modeling (TEAM) Project: Draft Field Work Plan for the Asian Long-Range Tracer Experiment

    Energy Technology Data Exchange (ETDEWEB)

    Allwine, K Jerry; Flaherty, Julia E.

    2007-08-01

    This report provides an experimental plan for a proposed Asian long-range tracer study as part of the international Tracer Experiment and Atmospheric Modeling (TEAM) Project. The TEAM partners are China, Japan, South Korea and the United States. Optimal times of year to conduct the study, meteorological measurements needed, proposed tracer release locations, proposed tracer sampling locations and the proposed durations of tracer releases and subsequent sampling are given. Also given are the activities necessary to prepare for the study and the schedule for completing the preparation activities leading to conducting the actual field operations. This report is intended to provide the TEAM members with the information necessary for planning and conducting the Asian long-range tracer study. The experimental plan is proposed, at this time, to describe the efforts necessary to conduct the Asian long-range tracer study, and the plan will undoubtedly be revised and refined as the planning goes forward over the next year.

  3. Implementing Distributed Operations: A Comparison of Two Deep Space Missions

    Science.gov (United States)

    Mishkin, Andrew; Larsen, Barbara

    2006-01-01

    Two very different deep space exploration missions--Mars Exploration Rover and Cassini--have made use of distributed operations for their science teams. In the case of MER, the distributed operations capability was implemented only after the prime mission was completed, as the rovers continued to operate well in excess of their expected mission lifetimes; Cassini, designed for a mission of more than ten years, had planned for distributed operations from its inception. The rapid command turnaround timeline of MER, as well as many of the operations features implemented to support it, have proven to be conducive to distributed operations. These features include: a single science team leader during the tactical operations timeline, highly integrated science and engineering teams, processes and file structures designed to permit multiple team members to work in parallel to deliver sequencing products, web-based spacecraft status and planning reports for team-wide access, and near-elimination of paper products from the operations process. Additionally, MER has benefited from the initial co-location of its entire operations team, and from having a single Principal Investigator, while Cassini operations have had to reconcile multiple science teams distributed from before launch. Cassini has faced greater challenges in implementing effective distributed operations. Because extensive early planning is required to capture science opportunities on its tour and because sequence development takes significantly longer than sequence execution, multiple teams are contributing to multiple sequences concurrently. The complexity of integrating inputs from multiple teams is exacerbated by spacecraft operability issues and resource contention among the teams, each of which has their own Principal Investigator. Finally, much of the technology that MER has exploited to facilitate distributed operations was not available when the Cassini ground system was designed, although later adoption

  4. Indonesia and the BRICS: Implementing the BEPS Action Plan

    Directory of Open Access Journals (Sweden)

    Andrey Shelepov

    2017-12-01

    Full Text Available Tax base erosion and profit shifting (BEPS is a global problem. Finding solutions is a challenge for most countries. The global economic crisis led to a new environment and requirements for doing business. These requirements have been developed by two key international institutions: the Organisation for Economic Cooperation and Development (OECD and the Group of 20 (G20. This approach has engaged the developed and developing countries that are members of these institutions, as well as a significant number of partner countries. As a result, more than 100 countries have confirmed their commitment to the BEPS Action Plan. This article assesses the level of implementation of the BEPS Plan in Indonesia and in the BRICS countries of Brazil, Russia, India, China and South Africa. The author monitored their activities for 13 of the 15 actions (excluding Actions 11 and 15 and identifies several best practices that can be used by Russia. Monitoring considered implemented and planned actions, primarily amendments to and new norms in relevant national legislation, as well as the expected implementation time for all BEPS actions. In addition, the author assessed institutional environments created to implement the provisions of the Action Plan, consultation processes and mechanisms for informing stakeholders. Analysis shows that approaches to implementing the BEPS Action Plan differ among the six countries. Although several lag behind in terms of their implementation schedule, each country has demonstrated some efforts that can be considered best practices. Russia has succeeded the most in implementing the Action Plan

  5. 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program

    International Nuclear Information System (INIS)

    Knepp, A. J.

    1999-01-01

    The 200 Areas Remedial Investigation/Feasibility Study Implementation Plan - Environmental Restoration Program (Implementation Plan) addresses approximately 700 soil waste sites (and associated structures such as pipelines) resulting from the discharge of liquids and solids from processing facilities to the ground (e.g., ponds, ditches, cribs,burial grounds) in the 200 Areas and assigned to the Environmental Restoration Program. The Implementation Plan outlines the framework for implementing assessment activities in the 200 Areas to ensure consistency in documentation, level of characterization, and decision making. The Implementation Plan also consolidates background information and other typical work plan materials, to serve as a single referenceable source for this type of information

  6. Maintenance implementation plan for fuel supply shutdown

    International Nuclear Information System (INIS)

    Stephenson, R.L.

    1995-06-01

    This Maintenance Implementation Plan is written to satisfy the requirements of DOE Order 4330.4B, ''MAINTENANCE MANAGEMENT PROGRAM'', that specifies the general policy and objectives for the establishment of DOE controlled maintenance programs. These Programs provide for the management and performance of cost-effective maintenance and repair of Department of Energy (DOE) property, which includes facilities. A review of DOE Order 4330.4B, particularly Chapter II the nuclear portion, against existing WHC site programs and policies has provided assurance that most requirements of this order have already been implemented by existing WHC programs. Applicable requirements and guidelines of 4330.4B that are deficient or not implemented are presently being developed and implemented through WHC site policies and programs. Where no program is presently identified or being developed for 4330.4B requirements, responsibility for implementation has been assigned within this plan

  7. 40 CFR 93.120 - Consequences of control strategy implementation plan failures.

    Science.gov (United States)

    2010-07-01

    ... Consequences of control strategy implementation plan failures. (a) Disapprovals. (1) If EPA disapproves any submitted control strategy implementation plan revision (with or without a protective finding), the... is determined. (2) If EPA disapproves a submitted control strategy implementation plan revision...

  8. Putting the "Team" in the Fine Arts Team: An Application of Business Management Team Concepts

    Science.gov (United States)

    Fisher, Ryan

    2007-01-01

    In this article, the author discusses current challenges to the idea of teamwork in fine arts teams, redefines the terms team and collaboration using a business management perspective, discusses the success of effective teams in the business world and the characteristics of those teams, and proposes the implementation of the business model of…

  9. Oak Ridge National Laboratory Corrective Action Plan in response to Tiger Team assessment. Volume 1, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Kuliasha, Michael A.

    1991-08-23

    This report presents a complete response to the Tiger Team assessment that was conducted at Oak Ridge National Laboratory (ORNL) and at the US Department of Energy (DOE) Oak Ridge Operations Office (ORO) from October 22, 1990, through November 30, 1990. The action plans have undergone both a discipline review and a cross-cutting review with respect to root cause. In addition, the action plans have been integrated with initiatives being pursued across Martin Marietta Energy Systems, Inc., in response to Tiger Team findings at other DOE facilities operated by Energy Systems. The root cause section is complete and describes how ORNL intends to address the root causes of the findings identified during the assessment. The action plan has benefited from a complete review by various offices at DOE Headquarters as well as review by the Tiger Team that conducted the assessment to ensure that the described actions are responsive to the observed problems.

  10. Evaluation of Plan Implementation: Peri-urban Development and the Shanghai Master Plan 1999-2020

    Directory of Open Access Journals (Sweden)

    Jinghuan He

    2015-01-01

    Full Text Available Since the 1980s China has experienced unprecedented urbanisation as a result of a series of reforms promoting rapid economic development. Shanghai, like the other big cities along China’s coastline, has witnessed extraordinary growth in its economy and population with industrial development and rural-to-urban migration generating extensive urban expansion. Shanghai’s GDP growth rate has been over 10 per cent for more than 15 years. Its population in 2013 was estimated at 23.47 million, which is double its size in 1979. The urban area enlarged by four times from 644 to 2,860 km2 between 1977 and 2010. Such demanding growth and dramatic changes present big challenges for urban planning practice in Shanghai. Plans have not kept up with development and the mismatch between the proposals in plans and the actual spatial development has gradually increased, reaching a critical level since 2000. The mismatch in the periurban areas is more notable than that in the existing urban area, but there has not been a systematic review of the relationship between plan and implementation. Indeed, there are few studies on the evaluation of plan implementation in China generally. Although many plans at numerous spatial levels are successively prepared and revised, only few of them have been evaluated in terms of their effectiveness and implementation.  This particularly demanding context for planning where spatial development becomes increasingly unpredictable and more difficult to influence presents an opportunity to investigate the role of plans under conditions of rapid urbanisation. The research project asks to what extent have spatial plans influenced the actual spatial development in the peri-urban areas of Shanghai? The research pays particular attention to the role of the Shanghai Master Plan 1999-2020 (Plan 1999. By answering the main research question this study seeks to contribute to a better understanding of present planning practice in Shanghai

  11. Restructuring: A School-Based Plan of Action.

    Science.gov (United States)

    Rothberg, Robert A.; Bozeman, William C.

    The processes by which school leaders can institutionalize staff and organizational development, with a focus on initiating school restructuring through team development, are described. Three features are necessary for implementing school restructuring through team development: a deliberate plan for staff involvement, a positive work environment,…

  12. Environmental Protection Implementation Plan, November 9, 1991--November 9, 1992

    International Nuclear Information System (INIS)

    Latham, A.R.; Evans, R.B.

    1991-11-01

    DOE Order 5400.1, ''General Environmental Protection Program,'' established environmental protection program requirements, authorities, and responsibilities to assure that the Department of Energy (DOE) operations are in compliance with applicable federal, state, and local environmental protection laws and regulations, executive orders, and internal department policies. Chapter 3 of DOE Order 5400.1 required that each field organization prepare a plan for implementing the requirements of this order by no later than November 9, 1989, and update the plan annually. Therefore, the Department of Energy/Field Office, Nevada (DOE/NV) has prepared this second annual update of its Environmental Protection Implementation Plan (EPIP). The Order and corresponding guidances also require estimated budgetary resources necessary for implementation of the Order be identified in the Environmental Protection Implementation Plan. To satisfy this requirement, the estimated costs to effectuate necessary changes in existing programs or processes and to institute new programs or processes for compliance with the Order are provided in the following sections of this plan. The DOE/NV Assistant Manager for Operations (AMO), in consultation with other organizations responsible for line management of plan implementation, is responsible for annual plan revisions. 7 figs

  13. Improving supervision: a team approach.

    Science.gov (United States)

    1993-01-01

    This issue of "The Family Planning Manager" outlines an interactive team supervision strategy as a means of improving family planning service quality and enabling staff to perform to their maximum potential. Such an approach to supervision requires a shift from a monitoring to a facilitative role. Because supervisory visits to the field are infrequent, the regional supervisor, clinic manager, and staff should form a team to share ongoing supervisory responsibilities. The team approach removes individual blame and builds consensus. An effective team is characterized by shared leadership roles, concrete work problems, mutual accountability, an emphasis on achieving team objectives, and problem resolution within the group. The team supervision process includes the following steps: prepare a visit plan and schedule; meet with the clinic manager and staff to explain how the visit will be conducted; supervise key activity areas (clinical, management, and personnel); conduct a problem-solving team meeting; conduct a debriefing meeting with the clinic manager; and prepare a report on the visit, including recommendations and follow-up plans. In Guatemala's Family Planning Unit, teams identify problem areas on the basis of agreement that a problem exists, belief that the problem can be solved with available resources, and individual willingness to accept responsibility for the specific actions identified to correct the problem.

  14. Are they ready? Organizational readiness for change among clinical teaching teams.

    Science.gov (United States)

    Bank, Lindsay; Jippes, Mariëlle; Leppink, Jimmie; Scherpbier, Albert Jja; den Rooyen, Corry; van Luijk, Scheltus J; Scheele, Fedde

    2017-01-01

    Curriculum change and innovation are inevitable parts of progress in postgraduate medical education (PGME). Although implementing change is known to be challenging, change management principles are rarely looked at for support. Change experts contend that organizational readiness for change (ORC) is a critical precursor for the successful implementation of change initiatives. Therefore, this study explores whether assessing ORC in clinical teaching teams could help to understand how curriculum change takes place in PGME. Clinical teaching teams in hospitals in the Netherlands were requested to complete the Specialty Training's Organizational Readiness for curriculum Change, a questionnaire to measure ORC in clinical teaching teams. In addition, change-related behavior was measured by using the "behavioral support-for-change" measure. A two-way analysis of variance was performed for all response variables of interest. In total, 836 clinical teaching team members were included in this study: 288 (34.4%) trainees, 307 (36.7%) clinical staff members, and 241 (28.8%) program directors. Overall, items regarding whether the program director has the authority to lead scored higher compared with the other items. At the other end, the subscales "management support and leadership," "project resources," and "implementation plan" had the lowest scores in all groups. The study brought to light that program directors are clearly in the lead when it comes to the implementation of educational innovation. Clinical teaching teams tend to work together as a team, sharing responsibilities in the implementation process. However, the results also reinforce the need for change management support in change processes in PGME.

  15. Effective Hull IMMR plan

    Energy Technology Data Exchange (ETDEWEB)

    Franco, Mireille

    2010-07-01

    The objective of the Hull Inspection, Maintenance and Repair Plan is to ensure the total integrity of the Floating Production Unit. To be efficient, the Monitoring has to be part of the Hull Inspection, Monitoring, Maintenance and Repair Plan (IMMR). The IMMR Plan should be developed during the design and project phases and take into account the interfaces between the different systems and teams' tasks in operation. The IMMR is multidisciplinary and form part of the hand-over to ensure an efficient and early implementation. Implementation of such a complex plan requires: - Cross-functionality: take advantage of the synergies - Boldness: break the mould and think outside the box - Listening: be attentive, be available, - Mutual support: during good and bad times. This paper presents the way Total believe the Hull IMMR Plan shall be developed, implemented and followed up. (Author)

  16. Implementing corporate wellness programs: a business approach to program planning.

    Science.gov (United States)

    Helmer, D C; Dunn, L M; Eaton, K; Macedonio, C; Lubritz, L

    1995-11-01

    1. Support of key decision makers is critical to the successful implementation of a corporate wellness program. Therefore, the program implementation plan must be communicated in a format and language readily understood by business people. 2. A business approach to corporate wellness program planning provides a standardized way to communicate the implementation plan. 3. A business approach incorporates the program planning components in a format that ranges from general to specific. This approach allows for flexibility and responsiveness to changes in program planning. 4. Components of the business approach are the executive summary, purpose, background, ground rules, approach, requirements, scope of work, schedule, and financials.

  17. PLANNING THE IMPLEMENTATION OF QUALITY THROUGH STRATEGY FORMULATION AND CORPORATE GOVERNANCE

    Directory of Open Access Journals (Sweden)

    Nikola Stefanović

    2007-09-01

    Full Text Available Planning the implementation of quality is a complex process that depends on many different internal and external factors. Planning the implementation is defined by the capabilities of management to visualize the market position of the company and to evaluate the company's strengths, weaknesses, opportunities, and threats. Serving to the company's purposes, planning the implementation of quality must be integrated into the company's strategic objectives and then transferred to other parts of the organization utilizing the corporate governance system. Planning the implementation, as a part of strategy formulation, should be reflected in: 1 company's vision and mission development, 2 goals setting, 3 strategy development aimed at achieving goals, 4 implementation and execution of the strategy, and 4 monitoring, evaluation, control, and readjustment of the strategy. Finally, planning must account for all possible implementation barriers.

  18. Team player styles, team design variables and team work effectiveness in Egypt

    OpenAIRE

    El-Kot, Ghada Awed Hassan

    2001-01-01

    The literature has revealed few studies of management in Arab countries in general and particularly in Egypt. Many Egyptian organisations implemented the team concept a number of years ago, however, there do not appear to be any studies investicitaýt inc",D team work effectiveness in Egypt. The literature review and the findings of a pilot study emphasised the need for empirical research in team work in Egypt. Team effectiveness models are examined in order to identify the fact...

  19. Do primary care professionals agree about progress with implementation of primary care teams: results from a cross sectional study.

    Science.gov (United States)

    Tierney, E; O'Sullivan, M; Hickey, L; Hannigan, A; May, C; Cullen, W; Kennedy, N; Kineen, L; MacFarlane, A

    2016-11-22

    Primary care is the cornerstone of healthcare reform with policies across jurisdictions promoting interdisciplinary team working. The effective implementation of such health policies requires understanding the perspectives of all actors. However, there is a lack of research about health professionals' views of this process. This study compares Primary Healthcare Professionals' perceptions of the effectiveness of the Primary Care Strategy and Primary Care Team (PCT) implementation in Ireland. Design and Setting: e-survey of (1) General Practitioners (GPs) associated with a Graduate Medical School (N = 100) and (2) Primary Care Professionals in 3 of 4 Health Service Executive (HSE) regions (N = 2309). After piloting, snowball sampling was used to administer the survey. Descriptive analysis was carried out using SPSS. Ratings across groups were compared using non-parametric tests. There were 569 responses. Response rates varied across disciplines (71 % for GPs, 22 % for other Primary Healthcare Professionals (PCPs). Respondents across all disciplines viewed interdisciplinary working as important. Respondents agreed on lack of progress of implementation of formal PCTs (median rating of 2, where 1 is no progress at all and 5 is complete implementation). GPs were more negative about the effectiveness of the Strategy to promote different disciplines to work together (median rating of 2 compared to 3 for clinical therapists and 3.5 for nurses, P = 0.001). Respondents identified resources and GP participation as most important for effective team working. Protected time for meetings and capacity to manage workload for meetings were rated as very important factors for effective team working by GPs, clinical therapists and nurses. A building for co-location of teams was rated as an important factor by nurses and clinical therapists though GPs rated it as less important. Payment to attend meetings and contractual arrangements were considered important factors by

  20. Advancing perspectives of sustainability and large-scale implementation of design teams in Ghana's polytechnics: Issues and opportunities

    NARCIS (Netherlands)

    Bakah, M.A.B.; Voogt, Joke; Pieters, Julius Marie

    2012-01-01

    Polytechnic staff perspectives are sought on the sustainability and large-scale implementation of design teams (DT), as a means for collaborative curriculum design and teacher professional development in Ghana's polytechnics, months after implementation. Data indicates that teachers still

  1. Total Quality Management: Analysis, Evaluation and Implementation Within ACRV Project Teams

    Science.gov (United States)

    Raiman, Laura B.

    1991-01-01

    Total quality management (TQM) is a cooperative form of doing business that relies on the talents of everyone in an organization to continually improve quality and productivity, using teams and an assortment of statistical and measurement tools. The Assured Crew Return Vehicle (ACRV) Project Office was identified as an excellent project in which to demonstrate the applications and benefits of TQM processes. As the ACRV Program moves through its various stages of development, it is vital that effectiveness and efficiency be maintained in order to provide the Space Station Freedom (SSF) crew an affordable, on-time assured return to Earth. A critical factor for the success of the ACRV is attaining the maximum benefit from the resources applied to the program. Through a series of four tutorials on various quality improvement techniques, and numerous one-on-one sessions during the SSF's 10-week term in the project office, results were obtained which are aiding the ACRV Office in implementing a disciplined, ongoing process for generating fundamental decisions and actions that shape and guide the organization. Significant advances were made in improving the processes for two particular groups - the correspondence distribution team and the WATER Test team. Numerous people from across JSC were a part of the various team activities including engineering, man systems, and safety. The work also included significant interaction with the support contractor to the ACRV Project. The results of the improvement activities can be used as models for other organizations desiring to operate under a system of continuous improvement. In particular, they have advanced the ACRV Project Teams further down the path of continuous improvement, in support of a working philosophy of TQM.

  2. Staff turnover in statewide implementation of ACT: relationship with ACT fidelity and other team characteristics.

    Science.gov (United States)

    Rollins, Angela L; Salyers, Michelle P; Tsai, Jack; Lydick, Jennifer M

    2010-09-01

    Staff turnover on assertive community treatment (ACT) teams is a poorly understood phenomenon. This study examined annual turnover and fidelity data collected in a statewide implementation of ACT over a 5-year period. Mean annual staff turnover across all observations was 30.0%. Turnover was negatively correlated with overall fidelity at Year 1 and 3. The team approach fidelity item was negatively correlated with staff turnover at Year 3. For 13 teams with 3 years of follow-up data, turnover rates did not change over time. Most ACT staff turnover rates were comparable or better than other turnover rates reported in the mental health and substance abuse literature.

  3. Sobriety Treatment and Recovery Teams: Implementation Fidelity and Related Outcomes.

    Science.gov (United States)

    Huebner, Ruth A; Posze, Lynn; Willauer, Tina M; Hall, Martin T

    2015-01-01

    Although integrated programs between child welfare and substance abuse treatment are recommended for families with co-occurring child maltreatment and substance use disorders, implementing integrated service delivery strategies with fidelity is a challenging process. This study of the first five years of the Sobriety Treatment and Recovery Team (START) program examines implementation fidelity using a model proposed by Carroll et al. (2007). The study describes the process of strengthening moderators of implementation fidelity, trends in adherence to START service delivery standards, and trends in parent and child outcomes. Qualitative and quantitative measures were used to prospectively study three START sites serving 341 families with 550 parents and 717 children. To achieve implementation fidelity to service delivery standards required a pre-service year and two full years of operation, persistent leadership, and facilitative actions that challenged the existing paradigm. Over four years of service delivery, the time from the child protective services report to completion of five drug treatment sessions was reduced by an average of 75 days. This trend was associated with an increase in parent retention, parental sobriety, and parent retention of child custody. Conclusions/Importance: Understanding the implementation processes necessary to establish complex integrated programs may support realistic allocation of resources. Although implementation fidelity is a moderator of program outcome, complex inter-agency interventions may benefit from innovative measures of fidelity that promote improvement without extensive cost and data collection burden. The implementation framework applied in this study was useful in examining implementation processes, fidelity, and related outcomes.

  4. Implementing and Evaluating a Peer-Led Team Learning Approach in Undergraduate Anatomy and Physiology

    Science.gov (United States)

    Finn, Kevin; Campisi, Jay

    2015-01-01

    This article describes how a Peer-Led Team Learning (PLTL) program was implemented in a first-year, undergraduate Anatomy and Physiology course sequence to examine the student perceptions of the program and determine the effects of PLTL on student performance.

  5. Do Different Training Conditions Facilitate Team Implementation?

    DEFF Research Database (Denmark)

    Nielsen, Karina; Randall, Raymond; Christensen, Karl B.

    2017-01-01

    A mixed methods approach was applied to examine the effects of a naturally occurring teamwork intervention supported with training. The first objective was to integrate qualitative process evaluation and quantitative effect evaluation to examine how and why the training influence intervention...... outcomes. The intervention (N = 328) was supplemented with four training conditions (no training, team member training, team leader training, and a combination of training types). The second objective was to examine whether different training conditions support team member training in isolation......, but not in combination, led to positive outcomes. The integrated analysis of qualitative and quantitative data indicated that a number of contextual factors interacted with training experiences and outcomes to influence the success of team intervention....

  6. Caribou conservation and recovery in Ontario: development and implementation of the Caribou Conservation Plan

    Directory of Open Access Journals (Sweden)

    Ted (E.R. Armstrong

    2012-03-01

    Full Text Available The range of Ontario’s woodland caribou (Rangifer tarandus caribou (forest-dwelling ecotype has receded northward substantially over many decades, leading to its current Threatened designation. Ontario released its Caribou Conservation Plan (CCP in the fall of 2009. This policy responded to public input and recommendations from the Ontario Woodland Caribou Recovery Team and the Caribou Science Review Panel, and outlines conservation and recovery actions to conserve and recover caribou. Within an adaptive management framework, the CCP builds upon a recent history of managing at large landscape scales in Ontario to implement a range management approach as the basis for recovery actions. These commitments and actions include enhanced research and monitoring, improved caribou habitat planning at the landscape scale, an integrated range analysis approach using advanced assessment tools to evaluate thresholds of habitat amount, arrangement and disturbance, the assessment of probability of persistence, consideration of cumulative effects, meeting forest management silvicultural performance requirements, consideration of caribou recovery implications when managing other wildlife, an initial focus on the southern edge of caribou distribution where threats are most significant, improved outreach and stewardship, and consideration of Aboriginal Traditional Knowledge in recovery actions. Implementation of the CCP signifies a long-term provincial commitment to caribou recovery, initially focusing on identified priorities within the CCP.

  7. Internal quality control: planning and implementation strategies.

    Science.gov (United States)

    Westgard, James O

    2003-11-01

    The first essential in setting up internal quality control (IQC) of a test procedure in the clinical laboratory is to select the proper IQC procedure to implement, i.e. choosing the statistical criteria or control rules, and the number of control measurements, according to the quality required for the test and the observed performance of the method. Then the right IQC procedure must be properly implemented. This review focuses on strategies for planning and implementing IQC procedures in order to improve the quality of the IQC. A quantitative planning process is described that can be implemented with graphical tools such as power function or critical-error graphs and charts of operating specifications. Finally, a total QC strategy is formulated to minimize cost and maximize quality. A general strategy for IQC implementation is recommended that employs a three-stage design in which the first stage provides high error detection, the second stage low false rejection and the third stage prescribes the length of the analytical run, making use of an algorithm involving the average of normal patients' data.

  8. Implementation of local climate action plans

    DEFF Research Database (Denmark)

    Damsø, Tue Noa Jacques; Kjær, Tyge; Christensen, Thomas Budde

    2017-01-01

    The purpose of this article is to improve understanding of local climate action plans and their implementation and evaluation. It explores how goal definition and the choice of assessment metrics frame goal attainment and influence implementation behaviour. Using the Danish capital of Copenhagen...... a high overall implementation performance, both in terms of changes in energy supply and emission reductions, these metrics are only partially linked. It also shows that inconsistencies between the system scope of the base year emissions and goal attainment, due to the use of offsetting, may lead...

  9. Influencing Change : Organizational Change and the Implementation of Self-Managing Teams

    OpenAIRE

    Bergman, Amanda; Mashouri, Mastaneh

    2017-01-01

    Organizational changes are inevitable, yet up to 70% fail. Technological development and competition in a volatile environment require more flexible organizations. As such, implementing self-managed teams (SMTs) has become a more common approach. The fact that SMTs ought to be self-managed has further raised a debate, since it is argued that some form of manager still is required. Therefore, the following research question was proposed; How does the interplay of influences unfold between the ...

  10. Dedication increases productivity: an analysis of the implementation of a dedicated medical team in the emergency department.

    Science.gov (United States)

    Ramos, Pedro; Paiva, José Artur

    2017-12-01

    In several European countries, emergency departments (EDs) now employ a dedicated team of full-time emergency medicine (EM) physicians, with a distinct leadership and bed-side emergency training, in all similar to other hospital departments. In Portugal, however, there are still two very different models for staffing EDs: a classic model, where EDs are mostly staffed with young inexperienced physicians from different medical departments who take turns in the ED in 12-h shifts and a dedicated model, recently implemented in some hospitals, where the ED is staffed by a team of doctors with specific medical competencies in emergency medicine that work full-time in the ED. Our study assesses the effect of an intervention in a large academic hospital ED in Portugal in 2002, and it is the first to test the hypothesis that implementing a dedicated team of doctors with EM expertise increases the productivity and reduces costs in the ED, maintaining the quality of care provided to patients. A pre-post design was used for comparing the change on the organisational model of delivering care in our medical ED. All emergency medical admissions were tracked in 2002 (classic model with 12-h shift in the ED) and 2005/2006 (dedicated team with full-time EM physicians), and productivity, costs with medical human resources and quality of care measures were compared. We found that medical productivity (number of patients treated per hour of medical work) increased dramatically after the creation of the dedicated team (X 2 KW = 31.135; N = 36; p work reduced both in regular hours and overtime. Moreover, hospitalisation rates decreased and the length of stay in the ED increased significantly after the creation of the dedicated team. Implementing a dedicated team of doctors increased the medical productivity and reduced costs in our ED. Our findings have straightforward implication for Portuguese policymakers aiming at reducing hospital costs while coping with increased ED demand.

  11. Planning, Implementation and Optimization of Future space Missions using an Immersive Visualization Environement (IVE) Machine

    Science.gov (United States)

    Harris, E.

    Planning, Implementation and Optimization of Future Space Missions using an Immersive Visualization Environment (IVE) Machine E. N. Harris, Lockheed Martin Space Systems, Denver, CO and George.W. Morgenthaler, U. of Colorado at Boulder History: A team of 3-D engineering visualization experts at the Lockheed Martin Space Systems Company have developed innovative virtual prototyping simulation solutions for ground processing and real-time visualization of design and planning of aerospace missions over the past 6 years. At the University of Colorado, a team of 3-D visualization experts are developing the science of 3-D visualization and immersive visualization at the newly founded BP Center for Visualization, which began operations in October, 2001. (See IAF/IAA-01-13.2.09, "The Use of 3-D Immersive Visualization Environments (IVEs) to Plan Space Missions," G. A. Dorn and G. W. Morgenthaler.) Progressing from Today's 3-D Engineering Simulations to Tomorrow's 3-D IVE Mission Planning, Simulation and Optimization Techniques: 3-D (IVEs) and visualization simulation tools can be combined for efficient planning and design engineering of future aerospace exploration and commercial missions. This technology is currently being developed and will be demonstrated by Lockheed Martin in the (IVE) at the BP Center using virtual simulation for clearance checks, collision detection, ergonomics and reach-ability analyses to develop fabrication and processing flows for spacecraft and launch vehicle ground support operations and to optimize mission architecture and vehicle design subject to realistic constraints. Demonstrations: Immediate aerospace applications to be demonstrated include developing streamlined processing flows for Reusable Space Transportation Systems and Atlas Launch Vehicle operations and Mars Polar Lander visual work instructions. Long-range goals include future international human and robotic space exploration missions such as the development of a Mars

  12. Safeguard Measures for Implementation of New Round of Land Consolidation Planning

    Institute of Scientific and Technical Information of China (English)

    LI Chen; LIU Xin-feng; PENG Zhe; SI Tao

    2012-01-01

    We conduct a comprehensive analysis of the current situation of security system for implementation of China’s land consolidation planning. The prominent problems in the process of implementing safeguard measures for planning are summarized as follows: the guiding ideology for planning formulation is imperfect; the legal basis is weak, and administrative means are not sound; the economic security mechanism is not brought into full play, and the social security measures still need to be further deepened; the technical safeguard measures are short. From laws and regulations, administrative management, economic security, social supervision, technology management and other aspects, we establish the scientific security system for implementation of land consolidation planning; put forth the recommendations for guaranteeing the implementation of planning in China.

  13. An implementation study of the crisis resolution team model in Norway: Are the crisis resolution teams fulfilling their role?

    Directory of Open Access Journals (Sweden)

    Johnson Sonia

    2011-05-01

    Full Text Available Abstract Background The establishment of crisis resolution teams (CRTs is part of the national mental health policy in several Western countries. The purpose of the present study is to describe characteristics of CRTs and their patients, explore the differences between CRTs, and examine whether the CRTs in Norway are organized according to the international CRT model. Methods The study was a naturalistic study of eight CRTs and 680 patients referred to these teams in Norway. Mental health problems were assessed using the Health of the Nation Outcome Scales (HoNOS, Global Assessment of Functioning Scales (GAF and the International Statistical Classification of Diseases and Related Health Problems, 10th Revision (ICD-10. Results None of the CRTs operated 24 hours a day, seven days a week (24/7 availability or had gate-keeping functions for acute wards. The CRTs also treated patients who were not considered for hospital admission. Forty per cent of patients waited more than 24 hours for treatment. Fourteen per cent had psychotic symptoms, and 69% had affective symptoms. There were significant variations between teams in patients' total severity of symptoms and social problems, but no variations between teams with respect to patients' aggressive behaviour, non-accidental self-injury, substance abuse or psychotic symptoms. There was a tendency for teams operating extended hours to treat patients with more severe mental illnesses. Conclusions The CRT model has been implemented in Norway without a rapid response, gate-keeping function and 24/7 availability. These findings indicate that the CRTs do not completely fulfil their intended role in the mental health system.

  14. The Influence of Leadership in The Conduct of the Implementation Process of Strategic Planning: A Case Study at the University Hospital of the University of St Catherine

    Directory of Open Access Journals (Sweden)

    Giselly Rizzatti

    2012-09-01

    Full Text Available Teaching hospitals are undergoing profound and fast changes, especially resulting from the implementation of new policies for health. To achieve their goals and remain competitive, these organizations have been forced to adopt more effective management tools, among which are the elaboration of a strategic plan. The goal of this study is to analyze the influence of leadership in driving the implementation process of strategic planning in a teaching hospital. The study was conducted in the university hospital Prof. Polydoro Ernani de São Thiago from Federal University of Santa Catarina - HU / UFSC, where a semi-structured interview was conducted with the coordinator of the Strategic Planning Team HU / UFSC. Authors Hersey et al (1986, Northouse (2004, Schein (1997 Senge (1999, among others, were grounded theoretically in the theme of leadership. The theory of strategic planning was primarily based on works by authors Ansoff (l991, Hrebiniak (2006 and Pereira (2010. With the research results, we can conclude the great influence that leadership plays in driving the implementation process of strategic planning.

  15. The challenge of executive team building in the aftermath of a hostile takeover

    International Nuclear Information System (INIS)

    Scott, R. G.

    1997-01-01

    In a hostile takeover, the executives of the acquired company are likely to have strong feelings that they may be unwanted by and considered disloyal to the the new company. They are likely to be filled with a sense that the 'new company' will 'get even with them' for the resistance put up to the merger. Therefore, the new company must be conscious of and sensitive to the fact that a strained environment exists and one of its first priorities should be to reduce that strain. Experience shows that a well informed Transition Team can minimize the emotional impacts of a hostile takeover and contribute significantly to the eventual success of the merger. To assure success, the Transition Team should be appointed early in the negotiating phase. It should have ready access to the negotiating team and the CEO to keep them fully informed of risk management issues caused by human resource. It should be involved in the strategic planning process during the pre-merger stage. It should have major responsibility for developing human resource impact studies, the development of organizational structure, the integration and implementation planning and monitoring of the progress of implementation. A list of Transition Team responsibilities and a list of proven techniques for turning a hostile environment into a productive win/win team environment are also included

  16. Consequences of team charter quality: Teamwork mental model similarity and team viability in engineering design student teams

    Science.gov (United States)

    Conway Hughston, Veronica

    Since 1996 ABET has mandated that undergraduate engineering degree granting institutions focus on learning outcomes such as professional skills (i.e. solving unstructured problems and working in teams). As a result, engineering curricula were restructured to include team based learning---including team charters. Team charters were diffused into engineering education as one of many instructional activities to meet the ABET accreditation mandates. However, the implementation and execution of team charters into engineering team based classes has been inconsistent and accepted without empirical evidence of the consequences. The purpose of the current study was to investigate team effectiveness, operationalized as team viability, as an outcome of team charter implementation in an undergraduate engineering team based design course. Two research questions were the focus of the study: a) What is the relationship between team charter quality and viability in engineering student teams, and b) What is the relationship among team charter quality, teamwork mental model similarity, and viability in engineering student teams? Thirty-eight intact teams, 23 treatment and 15 comparison, participated in the investigation. Treatment teams attended a team charter lecture, and completed a team charter homework assignment. Each team charter was assessed and assigned a quality score. Comparison teams did not join the lecture, and were not asked to create a team charter. All teams completed each data collection phase: a) similarity rating pretest; b) similarity posttest; and c) team viability survey. Findings indicate that team viability was higher in teams that attended the lecture and completed the charter assignment. Teams with higher quality team charter scores reported higher levels of team viability than teams with lower quality charter scores. Lastly, no evidence was found to support teamwork mental model similarity as a partial mediator of the team charter quality on team viability

  17. Implementation Of Management Strategic To Team Learning Cohesion In Study Program Of Nursing

    Directory of Open Access Journals (Sweden)

    Dr. Susila Sumartiningsih

    2015-06-01

    Full Text Available ABSTRACT The purpose of this research is to analyze the empiric of management strategic Driving Factor DF and Pull Factor PF to team learning cohesion among nursing program in Banten Provinsion. The study was designed in the quantitative descriptive correlational study and the method was a cross sectional. The total sampling n192 were manager n3 lecturers n45 and students n144 at nursing program study among Banten provice in Indonesia. The data were analyzed by using the Chi-Square.Theresults were showngood category 83.33 in DF and PF of Management Stratgict Implementataion and high category 59.72 in Team Learning Cohesion. There was not a statistically significant relationship p 0.543 p amp8805 0.05 between the DF and PF of team learning cohesion in implementation of Management Stratgic. In view of this it can be concluded that the nursing lecturer should be able to be a good motivator in order to encourage the student academic achievement.

  18. Land Use Control Implementation Plan

    Science.gov (United States)

    Starr, Andrew Scott

    2015-01-01

    This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.

  19. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  20. High performance computing and communications: FY 1995 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-04-01

    The High Performance Computing and Communications (HPCC) Program was formally established following passage of the High Performance Computing Act of 1991 signed on December 9, 1991. Ten federal agencies in collaboration with scientists and managers from US industry, universities, and laboratories have developed the HPCC Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1994 and FY 1995. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency. Although the Department of Education is an official HPCC agency, its current funding and reporting of crosscut activities goes through the Committee on Education and Health Resources, not the HPCC Program. For this reason the Implementation Plan covers nine HPCC agencies.

  1. Pacific Northwest Laboratory Maintenance Implementation plan

    International Nuclear Information System (INIS)

    Bright, J.D.

    1992-06-01

    This Maintenance Implementation plan has been developed for Pacific Northwest Laboratory's (PNL) Nuclear Facilities: 306W, 324, 325, 327 and 329NMF. It is based on a graded approach, self-assessment of the existing maintenance program(s) per the requirements specified by US Department of Energy (DOE) Order 4330.4A, Chapter II, Change number-sign 3. The results of this assessment were evaluated to determine needed improvements in PNL Craft Services' current maintenance program. The objective of this implementation plan is to provide baseline information for compliance to the DOE 4330.4A, and for needed improvements. The prime consideration in applying a graded approach to the Order has been to maintain safe and reliable operations, environmental compliance, safeguards and security, programmatic mission, facility preservation, and/or other facility-specific requirements. Using the results of the self-assessment, PNL has selected nine of the 18 elements of the Maintenance Program defined by DOE Order 4330.4A for improvement. The elements selected for improvement are Training and Qualification of Maintenance Personnel; Maintenance Procedures; Planning, Scheduling, and Coordination of Maintenance; Control of Maintenance Activities; Post-Maintenance Testing; Facility Condition Inspection; Management Involvement; Maintenance History; and Additional Maintenance Requirements. Based upon graded approach and current funding, those elements considered most important have been selected as goals for earliest compliance. Commitment dates for these elements have been established for compliance. The remaining elements of noncompliance will be targeted for implementation during later budget periods

  2. Developing and Implementing a Citywide Asthma Action Plan: A Community Collaborative Partnership.

    Science.gov (United States)

    Staudt, Amanda Marie; Alamgir, Hasanat; Long, Debra Lynn; Inscore, Stephen Curtis; Wood, Pamela Runge

    2015-12-01

    Asthma affects 1 in 10 children in the United States, with higher prevalence among children living in poverty. Organizations in San Antonio, Texas, partnered to design and implement a uniform, citywide asthma action plan to improve asthma management capacity in schools. The asthma action plan template was modified from that of the Global Initiative for Asthma. School personnel were trained in symptom recognition, actions to take, and use of equipment before the asthma action plan implementation. The annual Asthma Action Plan Summit was organized as a forum for school nurses, healthcare providers, and members of the community to exchange ideas and strategies on implementation, as well as to revise the plan. The asthma action plan was implemented in all 16 local school districts. Feedback received from school nurses suggests that the citywide asthma action plan resulted in improved asthma management and student health at schools. The evidence in this study suggests that community organizations can successfully collaborate to implement a citywide health initiative similar to the asthma action plan.

  3. [Support Team for Investigator-Initiated Clinical Research].

    Science.gov (United States)

    Fujii, Hisako

    2017-07-01

    Investigator-initiated clinical research is that in which investigators plan and carry out their own clinical research in academia. For large-scale clinical research, a team should be organized and implemented. This team should include investigators and supporting staff, who will promote smooth research performance by fulfilling their respective roles. The supporting staff should include project managers, administrative personnel, billing personnel, data managers, and clinical research coordinators. In this article, I will present the current status of clinical research support and introduce the research organization of the Dominantly Inherited Alzheimer Network (DIAN) study, an investigator-initiated international clinical research study, with particular emphasis on the role of the project management staff and clinical research coordinators.

  4. Gen IV Materials Handbook Implementation Plan

    International Nuclear Information System (INIS)

    Rittenhouse, P.; Ren, W.

    2005-01-01

    A Gen IV Materials Handbook is being developed to provide an authoritative single source of highly qualified structural materials information and materials properties data for use in design and analyses of all Generation IV Reactor Systems. The Handbook will be responsive to the needs expressed by all of the principal government, national laboratory, and private company stakeholders of Gen IV Reactor Systems. The Gen IV Materials Handbook Implementation Plan provided here addresses the purpose, rationale, attributes, and benefits of the Handbook and will detail its content, format, quality assurance, applicability, and access. Structural materials, both metallic and ceramic, for all Gen IV reactor types currently supported by the Department of Energy (DOE) will be included in the Gen IV Materials Handbook. However, initial emphasis will be on materials for the Very High Temperature Reactor (VHTR). Descriptive information (e.g., chemical composition and applicable technical specifications and codes) will be provided for each material along with an extensive presentation of mechanical and physical property data including consideration of temperature, irradiation, environment, etc. effects on properties. Access to the Gen IV Materials Handbook will be internet-based with appropriate levels of control. Information and data in the Handbook will be configured to allow search by material classes, specific materials, specific information or property class, specific property, data parameters, and individual data points identified with materials parameters, test conditions, and data source. Details on all of these as well as proposed applicability and consideration of data quality classes are provided in the Implementation Plan. Website development for the Handbook is divided into six phases including (1) detailed product analysis and specification, (2) simulation and design, (3) implementation and testing, (4) product release, (5) project/product evaluation, and (6) product

  5. Implementation of team training in medical education in Denmark

    DEFF Research Database (Denmark)

    Østergaard, H T; Østergaard, Ditte; Lippert, A

    2008-01-01

    In the field of medicine, team training aiming at improving team skills such as leadership, communication, co-operation, and followership at the individual and the team level seems to reduce risk of serious events and therefore increase patient safety. The preferred educational method for this type...... of training is simulation. Team training is not, however, used routinely in the hospital. In this paper, we describe a framework for the development of a team training course based on need assessment, learning objectives, educational methods including full-scale simulation and evaluations strategies. The use...... of this framework is illustrated by the present multiprofessional team training in advanced cardiac life support, trauma team training and neonatal resuscitation in Denmark. The challenges of addressing all aspects of team skills, the education of the facilitators, and establishment of evaluation strategies...

  6. Mr. Traore introduces team supervision. Case scenarios for training and group discussion.

    Science.gov (United States)

    1993-01-01

    This supplement to "The Family Planning Manager" presents a case example and five case discussion questions to illustrate the concept of team supervision. In contrast to traditional supervision, where an emphasis is placed on inspection and the uncovering of deficiencies, team supervision uses a facilitative, advocacy-oriented approach. Problem-solving and decision-making responsibilities are assumed by the clinic staff, who identify and analyze problems in group meetings. Thus, the focus shifts from assessing individual performance to evaluating how well they meet clinic objectives as a team. In the team meetings, the visiting supervisor asks the team as a whole to analyze clinic problems and ensures that all staff members are aware of the significance of their contributions. The supervisor also clarifies the division of labor required for implementing solutions and performance standards. Staff are asked if they have concerns they would like communicated to the next organizational level. The supervisory report of the visit can serve as a guide for implementing the recommendations. This approach may require that supervisors and clinic managers receive training in problem solving, motivating staff, team building, and providing constructive feedback.

  7. Project Management Plan (PMP) for Work Management Implementation

    International Nuclear Information System (INIS)

    SHIPLER, C.E.

    2000-01-01

    The purpose of this document is to provide a project plan for Work Management Implementation by the River Protection Project (RPP). Work Management is an information initiative to implement industry best practices by replacing some Tank Farm legacy system

  8. Oil program implementation plan FY 1996--2000

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-04-01

    This document reaffirms the US Department of Energy (DOE) Office of Fossil Energy commitment to implement the National Oil Research Program in a way to maximize assurance of energy security, economic growth, environmental protection, jobs, improved economic competitiveness, and improved US balance of trade. There are two sections and an appendix in this document. Section 1 is background information that guided its formulation and a summary of the Oil Program Implementation Plan. This summary includes mission statements, major program drivers, oil issues and trends, budget issues, customers/stakeholders, technology transfer, measures of program effectiveness, and benefits. Section 2 contains more detailed program descriptions for the eight technical areas and the NIPER infrastructure. The eight technical areas are reservoir characterization; extraction research; exploration, drilling, and risk-based decision management; analysis and planning; technology transfer; field demonstration projects; oil downstream operations; and environmental research. Each description contains an overview of the program, descriptions on main areas, a discussion of stakeholders, impacts, planned budget projections, projected schedules with Gantt charts, and measures of effectiveness. The appendix is a summary of comments from industry on an earlier draft of the plan. Although changes were made in response to the comments, many of the suggestions will be used as guidance for the FY 1997--2001 plan.

  9. Savannah River Site Environmental Implementation Plan. Volume 2, Protection programs

    Energy Technology Data Exchange (ETDEWEB)

    1989-08-01

    Formal sitewide environmental planning at the . Savannah River Site (SRS) began in 1986 with the development and adoption of the Strategic Environmental Plan. The Strategic Environmental Plan describes the philosophy, policy, and overall program direction of environmental programs for the operation of the SRS. The Strategic Environmental Plan (Volume 2) provided the basis for development of the Environmental Implementation Plan (EIP). The EIP is the detailed, comprehensive environmental master plan for operating contractor organizations at the SRS. The EIP provides a process to ensure that all environmental requirements and obligations are being met by setting specific measurable goals and objectives and strategies for implementation. The plan is the basis for justification of site manpower and funding requests for environmental projects and programs over a five-year planning period.

  10. Validity and usefulness of members reports of implementation progress in a quality improvement initiative: findings from the Team Check-up Tool (TCT

    Directory of Open Access Journals (Sweden)

    Marsteller Jill A

    2011-10-01

    Full Text Available Abstract Background Team-based interventions are effective for improving safety and quality of healthcare. However, contextual factors, such as team functioning, leadership, and organizational support, can vary significantly across teams and affect the level of implementation success. Yet, the science for measuring context is immature. The goal of this study is to validate measures from a short instrument tailored to track dynamic context and progress for a team-based quality improvement (QI intervention. Methods Design: Secondary cross-sectional and longitudinal analysis of data from a clustered randomized controlled trial (RCT of a team-based quality improvement intervention to reduce central line-associated bloodstream infection (CLABSI rates in intensive care units (ICUs. Setting: Forty-six ICUs located within 35 faith-based, not-for-profit community hospitals across 12 states in the U.S. Population: Team members participating in an ICU-based QI intervention. Measures: The primary measure is the Team Check-up Tool (TCT, an original instrument that assesses context and progress of a team-based QI intervention. The TCT is administered monthly. Validation measures include CLABSI rate, Team Functioning Survey (TFS and Practice Environment Scale (PES from the Nursing Work Index. Analysis: Temporal stability, responsiveness and validity of the TCT. Results We found evidence supporting the temporal stability, construct validity, and responsiveness of TCT measures of intervention activities, perceived group-level behaviors, and barriers to team progress. Conclusions The TCT demonstrates good measurement reliability, validity, and responsiveness. By having more validated measures on implementation context, researchers can more readily conduct rigorous studies to identify contextual variables linked to key intervention and patient outcomes and strengthen the evidence base on successful spread of efficacious team-based interventions. QI teams

  11. Maintenance implementation plan for T Plant. Revision 2

    International Nuclear Information System (INIS)

    Ayers, W.S.

    1995-05-01

    This document is a Maintenance Implementation Plan (MIP) for the T Plant Facility complex located in the 200 West Area of the Hanford Reservation in Washington state. This plan has been developed to provide a disciplined approach to maintenance functions and to describe how the T Plant facility will implement and comply with the regulations according to US DOE order 4330.4B, entitled Maintenance Management Program, Chapter 2.0 open-quotes Nuclear Facilitiesclose quotes. Physical structures, systems, processes, as well as all associated equipment specifically assigned to these groups are included in the MIP

  12. Implementation of team training in medical education in Denmark.

    Science.gov (United States)

    Østergaard, H T; Østergaard, D; Lippert, A

    2008-10-01

    In the field of medicine, team training aiming at improving team skills such as leadership, communication, co-operation, and followership at the individual and the team level seems to reduce risk of serious events and therefore increase patient safety. The preferred educational method for this type of training is simulation. Team training is not, however, used routinely in the hospital. In this paper, we describe a framework for the development of a team training course based on need assessment, learning objectives, educational methods including full-scale simulation and evaluations strategies. The use of this framework is illustrated by the present multiprofessional team training in advanced cardiac life support, trauma team training and neonatal resuscitation in Denmark. The challenges of addressing all aspects of team skills, the education of the facilitators, and establishment of evaluation strategies to document the effect of the different types of training on patient safety are discussed.

  13. Environmental Implementation Plan - EIP introduction

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1993-01-01

    Due to the commitment and participation of more than 100 professionals from site environmental coordinators, customer improvements and total quality are being incorporated into the Environmental Implementation Plan (EIP). The EIP is now a living document that communicates an overview of site environmental programs and the facility plans that are designed to protect the environment and meet changing regulatory requirements. Continuous improvement of environmental programs is enhanced through planned quarterly self-assessments during the open-quotes Reflectionsclose quotes process. Through the sharing of noteworthy practices, lessons learned, and ideas for improvement, the EIP provides a framework for environmental professionals to promote cost effective solutions and program improvements through teamwork and communication. These efforts were initiated by the Central Environmental Committee Executive Committee (CECEC) and developed and coordinated by the EIP subcommittee. The EIP revision process is the baseline for a continuous improvement cycle. Although the EIP is a Westinghouse Savannah River Company (WSRC) document, the environmental-planning process involves and will benefit all site contractors. Together, we are committed to a open-quotes Partnership in Environmental Excellence.close quotes

  14. 76 FR 41424 - Finding of Substantial Inadequacy of Implementation Plan; Call for Iowa State Implementation Plan...

    Science.gov (United States)

    2011-07-14

    ... modeling requirement for this SIP call should allow for the use of the modeling protocol developed by Iowa... is making a finding that the Iowa State Implementation Plan (SIP) is substantially inadequate to... ) in Muscatine County, Iowa. The specific SIP deficiencies needing revision are described below. EPA is...

  15. Management implementation plan for a safety analysis and review system

    International Nuclear Information System (INIS)

    Hulburt, D.A.; Berkey, B.D.

    1981-04-01

    The US Department of Energy has issued an Order, DOE 5481.1, which establishes uniform requirements for the preparation and review of Safety Analysis for DOE Operations. The Management Implementation Plan specified herein establishes the administrative procedures and technical requirements for implementing DOE 5481.1 to Operations under the cognizance of the Pittsburgh Energy Technology Center. This Implementation Plan is applicable to all present and future Operations under the cognizance of PETC. The Plan identifies those Operations for which DOE 5481.1 is applicable and those Operations for which no further analysis is required because the initial determination and review has concluded that DOE 5481.1 does not apply

  16. Planning and management of change

    International Nuclear Information System (INIS)

    Nelson, R.M. Jr.; Statton, C.T.; St. Clair, R.K.

    1994-01-01

    The 1990s promise to be a decade of change. In business, the focus will be on restructuring for purposes of improved productivity and efficiency. The Department of Energy (DOE) has recognized that change is on the horizon. The Yucca Mountain Project, carried out under the Office of Civilian Radioactive Waste Management (OCRWM) within the DOE is under new leadership. This new leadership is restructuring its operations to provide better focus, greater efficiency, meaningful products demonstrating progress and a more open operational environment. Criticisms of past operations have been reviewed and evaluated such that the new management organization derives benefit from the past. In recognition that management concerns may be manifested in other areas, Yucca Mountain Project management believes that reorganization is necessary to maximize efficiency. In designing the new organization, a high priority has been placed upon making changes which enable the federal leadership to exercise appropriate control and make participants more responsible and accountable for their work. Transition to the new organization will be implemented in four phases: (1) establishing the management construct, (2) defining roles and responsibilities of functional management, (3) development of the task performance teams, and (4) subsequent evolution of the open-quotes project teamclose quotes as a whole. A program-wide strategic plan is being prepared which includes a variety of revisions to the program of the past. This plan charts the path the Department will follow in fulfilling its mission. The vision of the new management developed by the DOE focuses on the creation of open-quotes teams,close quotes both a management team and task performance teams. The new management team will be tasked with implementing the plan

  17. Optimized planning methodologies of ASON implementation

    Science.gov (United States)

    Zhou, Michael M.; Tamil, Lakshman S.

    2005-02-01

    Advanced network planning concerns effective network-resource allocation for dynamic and open business environment. Planning methodologies of ASON implementation based on qualitative analysis and mathematical modeling are presented in this paper. The methodology includes method of rationalizing technology and architecture, building network and nodal models, and developing dynamic programming for multi-period deployment. The multi-layered nodal architecture proposed here can accommodate various nodal configurations for a multi-plane optical network and the network modeling presented here computes the required network elements for optimizing resource allocation.

  18. Implementation guide for Hanford Analytical Services Quality Assurance Plan

    International Nuclear Information System (INIS)

    1994-09-01

    This implementation guide for the Hanford Analytical Services Quality Assurance Plan (HASQAP) was developed by the US Department of Energy, Richland Operations Office (RL) Waste Management Division, Analytical Services Branch. This plan formally presents RL's direction for Hanford Sitewide implementation of the HASQAP. The HASQAP establishes a uniform standard for quality requirements to meet US Department of Energy Order 5700.6C, Quality Assurance (10 CFR 830.120, ''Quality Assurance Requirements''), and is intended to satisfy the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) requirements for ''Guidance on Preparation of Laboratory Quality Assurance Plans''. The quality assurance criteria specified in the HASQAP shall serve as a baseline for implementing quality management systems for the laboratories that provide analytical services, for data requesters and users, and for oversight organizations that monitor the data-generation process. Affected organizations shall implement the HASQAP requirements that are applicable to their work scope. Full implementation of the HASQAP is scheduled to occur by August 1995. RL will work with the US Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology) to have the HASQAP document incorporated into Appendix F of the Tri-Party Agreement by early Fiscal Year 1996

  19. Implementation of team training in medical education in Denmark

    OpenAIRE

    Ostergaard, H; Ostergaard, D; Lippert, A

    2004-01-01

    In the field of medicine, team training aiming at improving team skills such as leadership, communication, co-operation, and followership at the individual and the team level seems to reduce risk of serious events and therefore increase patient safety. The preferred educational method for this type of training is simulation. Team training is not, however, used routinely in the hospital. In this paper, we describe a framework for the development of a team training course based on need assessme...

  20. Outcomes of Patients with Intestinal Failure after the Development and Implementation of a Multidisciplinary Team

    Directory of Open Access Journals (Sweden)

    Sabrina Furtado

    2016-01-01

    Full Text Available Aim. A multidisciplinary team was created in our institution to manage patients with intestinal failure (INFANT: INtestinal Failure Advanced Nutrition Team. We aimed to evaluate the impact of the implementation of the team on the outcomes of this patient population. Methods. Retrospective chart review of patients with intestinal failure over a 6-year period was performed. Outcomes of patients followed up by INFANT (2010–2012 were compared to a historical cohort (2007–2009. Results. Twenty-eight patients with intestinal failure were followed up by INFANT while the historical cohort was formed by 27 patients. There was no difference between the groups regarding remaining length of small and large bowel, presence of ICV, or number of infants who reached full enteral feeds. Patients followed up by INFANT took longer to attain full enteral feeds and had longer duration of PN, probably reflecting more complex cases. Overall mortality (14.8%/7.1% was lower than other centers, probably illustrating our population of “early” intestinal failure patients. Conclusions. Our data demonstrates that the creation and implementation of a multidisciplinary program in a tertiary center without an intestinal and liver transplant program can lead to improvement in many aspects of their care.

  1. Lead State Implementation Plan (SIP) Checklist Guide

    Science.gov (United States)

    Guidance documents and examples to assist air quality agencies of non-attainment areas in developing plans to implement national ambient air quality standards (NAAQS), including the lead air emissions standard.

  2. U.S. Department of Energy defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Jordan, E.A.

    1988-01-01

    The Program Implementation Plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  3. An Exploratory Study on the Critical Success Factors in the Implementation of Enterprise Resource Planning Systems in Venezuela

    Directory of Open Access Journals (Sweden)

    Leopoldo Colmenares

    2005-08-01

    Full Text Available This paper reports on an exploratory study, carried out in seven Venezuelan organizations who have successfully implemented an enterprise resource planning (ERP system. The data were collected by means of both a questionnaire and of conducted interviews to the seven project managers of the project of implementation of ERP systems in these enterprises. The purpose of the study was to know the perceptions the project managers, on aspects and activities of the process of implementing an ERP system and that are strongly correlated with the Critical Success Factors (FCE’s for this kind of projects. The FCE’s were identified in a deep revision of the literature. The questionnaire included, among others, questions on the top management support to the project, the process of selection of the system, team work implementation and the participation and training of the users. Additionally were identified the problems that organizations confronted during the implementation process. The study concludes that organizations must take care the elements that indicate the FCE’s, because them hit positively the project, additionally describe aspects, which must take into account the enterprises who are in the process to adopt an ERP system to facilitate its implementation.

  4. STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team in MCC Bldg 30 FCR

    Science.gov (United States)

    1992-01-01

    STS-49 Endeavour, Orbiter Vehicle (OV) 105, Planning Team with Flight Director (FD) James M. Heflin, Jr (front right next to ship model) poses in JSC's Mission Control Center (MCC) Bldg 30 Flight Control Room (FCR). The group stands in front of visual displays projecting STS-49 data and ground track map.

  5. A Data Scheduling and Management Infrastructure for the TEAM Network

    Science.gov (United States)

    Andelman, S.; Baru, C.; Chandra, S.; Fegraus, E.; Lin, K.; Unwin, R.

    2009-04-01

    The objective of the Tropical Ecology Assessment and Monitoring Network (www.teamnetwork.org) is "To generate real time data for monitoring long-term trends in tropical biodiversity through a global network of TEAM sites (i.e. field stations in tropical forests), providing an early warning system on the status of biodiversity to effectively guide conservation action". To achieve this, the TEAM Network operates by collecting data via standardized protocols at TEAM Sites. The standardized TEAM protocols include the Climate, Vegetation and Terrestrial Vertebrate Protocols. Some sites also implement additional protocols. There are currently 7 TEAM Sites with plans to grow the network to 15 by June 30, 2009 and 50 TEAM Sites by the end of 2010. Climate Protocol The Climate Protocol entails the collection of climate data via meteorological stations located at the TEAM Sites. This includes information such as precipitation, temperature, wind direction and strength and various solar radiation measurements. Vegetation Protocol The Vegetation Protocol collects standardized information on tropical forest trees and lianas. A TEAM Site will have between 6-9 1ha plots where trees and lianas larger than a pre-specified size are mapped, identified and measured. This results in each TEAM Site repeatedly measuring between 3000-5000 trees annually. Terrestrial Vertebrate Protocol The Terrestrial Vertebrate Protocol collects standardized information on mid-sized tropical forest fauna (i.e. birds and mammals). This information is collected via camera traps (i.e. digital cameras with motion sensors housed in weather proof casings). The images taken by the camera trap are reviewed to identify what species are captured in the image by the camera trap. The image and the interpretation of what is in the image are the data for the Terrestrial Vertebrate Protocol. The amount of data collected through the TEAM protocols provides a significant yet exciting IT challenge. The TEAM Network is

  6. Can the collective intentions of individual professionals within healthcare teams predict the team's performance: developing methods and theory

    Directory of Open Access Journals (Sweden)

    Bosch Marije

    2009-05-01

    Full Text Available Abstract Background Within implementation research, using theory-based approaches to understanding the behaviours of healthcare professionals and the quality of care that they reflect and designing interventions to change them is being promoted. However, such approaches lead to a new range of methodological and theoretical challenges pre-eminent among which are how to appropriately relate predictors of individual's behaviour to measures of the behaviour of healthcare professionals. The aim of this study was to explore the relationship between the theory of planned behaviour proximal predictors of behaviour (intention and perceived behavioural control, or PBC and practice level behaviour. This was done in the context of two clinical behaviours – statin prescription and foot examination – in the management of patients with diabetes mellitus in primary care. Scores for the predictor variables were aggregated over healthcare professionals using four methods: simple mean of all primary care team members' intention scores; highest intention score combined with PBC of the highest intender in the team; highest intention score combined with the highest PBC score in the team; the scores (on both constructs of the team member identified as having primary responsibility for the clinical behaviour. Methods Scores on theory-based cognitive variables were collected by postal questionnaire survey from a sample of primary care doctors and nurses from northeast England and the Netherlands. Data on two clinical behaviours were patient reported, and collected by postal questionnaire survey. Planned analyses explored the predictive value of various aggregations of intention and PBC in explaining variance in the behavioural data. Results Across the two countries and two behaviours, responses were received from 37 to 78% of healthcare professionals in 57 to 93% practices; 51% (UK and 69% (Netherlands of patients surveyed responded. None of the aggregations of

  7. Implementing Role-Changing Versus Time-Changing Innovations in Health Care: Differences in Helpfulness of Staff Improvement Teams, Management, and Network for Learning.

    Science.gov (United States)

    Nembhard, Ingrid M; Morrow, Christopher T; Bradley, Elizabeth H

    2015-12-01

    Health care organizations often fail in their effort to implement care-improving innovations. This article differentiates role-changing innovations, altering what workers do, from time-changing innovations, altering when tasks are performed or for how long. We examine our hypothesis that the degree to which access to groups that can alter organizational learning--staff, management, and external network--facilitates implementation depends on innovation type. Our longitudinal study using ordinal logistic regression and survey data on 517 hospitals' implementation of evidence-based practices for treating heart attack confirmed our thesis for factors granting access to each group: improvement team's representativeness (of affected staff), senior management engagement, and network membership. Although team representativeness and network membership were positively associated with implementing role-changing practices, senior management engagement was not. In contrast, senior management engagement was positively associated with implementing time-changing practices, whereas team representativeness was not, and network membership was not unless there was limited management engagement. These findings advance implementation science by explaining mixed results across past studies: Nature of change for workers alters potential facilitators' effects on implementation. © The Author(s) 2015.

  8. 40 CFR 264.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 264.51 Section 264.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED... DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 264.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The contingency...

  9. U.S. Department of Energy, defense waste management program implementation plan

    International Nuclear Information System (INIS)

    Chee, T.

    1988-01-01

    This paper reports that the program implementation plan describes the Department of Energy's current approach to managing its defense high-level, low-level, and transuranic radioactive waste. It documents implementation of the policies described in the 1983 Defense Waste Management Plan

  10. Arroyo Management Plan (Alameda County): A Plan for Implementing Access and Restoring Riparian Habitats

    Science.gov (United States)

    Kent E. Watson; Jim Horner; Louise Mozingo

    1989-01-01

    Innovative techniques for restoring riparian habitats are of little value without a community endorsed plan for their implementation. A flood control district commissioned the Arroyo Management Plan in order to determine how it might provide public access and improve habitat along its current and future channels in a fast-growing area of Northern California. The Plan,...

  11. Update of the Used Fuel Dispositon Campaign Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    McMahon, Kevin A. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Bragg-Sitton, Shannon [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mackinnon, Robert James [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Saltzstein, Sylvia J. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Sorenson, Ken B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Swift, Peter N. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Birkholzer, Jens T. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2014-10-01

    This Update to the Used Fuel Disposition Campaign Implementation Plan provides summary level detail describing how the Used Fuel Disposition Campaign (UFDC) supports achievement of the overarching mission and objectives of the Department of Energy Office of Nuclear Energy Fuel Cycle Technologies Program, building on work completed in this area since 2009. This implementation plan begins with the assumption of target dates that are set out in the January 2013 DOE Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste (http://energy.gov/downloads/strategy-management-and-disposal-used-nuclearfuel- and-high-level-radioactive-waste). These target dates and goals are summarized in section III. This implementation plan will be maintained as a living document and will be updated as needed in response to available funding and progress in the Used Fuel Disposition Campaign and the Fuel Cycle Technologies Program.

  12. NASA Education Implementation Plan 2015-2017

    Science.gov (United States)

    National Aeronautics and Space Administration, 2015

    2015-01-01

    The NASA Education Implementation Plan (NEIP) provides an understanding of the role of NASA in advancing the nation's STEM education and workforce pipeline. The document outlines the roles and responsibilities that NASA Education has in approaching and achieving the agency's and administration's strategic goals in STEM Education. The specific…

  13. Program Development Plan and Team up

    Energy Technology Data Exchange (ETDEWEB)

    Solar Electric Power Association

    2001-12-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead.

  14. 40 CFR 265.51 - Purpose and implementation of contingency plan.

    Science.gov (United States)

    2010-07-01

    ... contingency plan. 265.51 Section 265.51 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED..., STORAGE, AND DISPOSAL FACILITIES Contingency Plan and Emergency Procedures § 265.51 Purpose and implementation of contingency plan. (a) Each owner or operator must have a contingency plan for his facility. The...

  15. Effects of time pressure and communication environment on team processes and outcomes in dyadic planning

    NARCIS (Netherlands)

    Kleij, R van der; Lijkwan, J.T.E..; Dreu, C.K.W. de

    2009-01-01

    An experiment compared dyadic performance in a radio communication and a more sophisticated communication environment to face-to-face (FtF) meetings. Thirty-six dyads, working under low or high time-pressure conditions, needed to combine information and to produce a written plan. Teams working in

  16. Planning and implementation of nuclear research programmes

    International Nuclear Information System (INIS)

    Lopes, J.L.

    1986-01-01

    The planning and implementation of nuclear research programmes in developed and developing countries is discussed. The main aspects of these programmes in USA, France, Japan, India and Brazil are reported. (M.W.O.) [pt

  17. High performance computing and communications: FY 1996 implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-16

    The High Performance Computing and Communications (HPCC) Program was formally authorized by passage of the High Performance Computing Act of 1991, signed on December 9, 1991. Twelve federal agencies, in collaboration with scientists and managers from US industry, universities, and research laboratories, have developed the Program to meet the challenges of advancing computing and associated communications technologies and practices. This plan provides a detailed description of the agencies` HPCC implementation plans for FY 1995 and FY 1996. This Implementation Plan contains three additional sections. Section 3 provides an overview of the HPCC Program definition and organization. Section 4 contains a breakdown of the five major components of the HPCC Program, with an emphasis on the overall directions and milestones planned for each one. Section 5 provides a detailed look at HPCC Program activities within each agency.

  18. Bahasa Indonesia: Policy, Implementation, and Planning

    Directory of Open Access Journals (Sweden)

    Risa R. Simanjuntak

    2009-05-01

    Full Text Available Language policy or language planning is still in the surge for familiarity and importance. However, this paper argues that in the case of Bahasa Indonesia current implementations should be evaluated based on its relevance and future plan. The historical perspectives will reveal the roots of the current policy and therefore make foundations for further discussions. From the study of literature, this paper is arguing that new paradigm for nationalism, roles in the global competition, as well as regional languages as competitive advantage could be well adopted to nurture a more inclusive and progressive Bahasa Indonesia.  

  19. Report on the emergency evacuation review team on emergency response plans for the Perry and Davis-Besse nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    This book is a report by Ohio's Emergency Evacuation Review Team, at the request of Governor Richard Celeste. The Team concludes that the current emergency response plan for Ohio's reactors is inadequate to protect the public and recommends changes in the current emergency plant requirements. The report also includes a summary of the litigation that has occurred since Celeste withdrew his support for the plans, a list of experts consulted, and sources used to prepare the report. An important document, and a study which every state should undertake

  20. 40 CFR 300.110 - National Response Team.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 27 2010-07-01 2010-07-01 false National Response Team. 300.110... PLAN Responsibility and Organization for Response § 300.110 National Response Team. National planning... agencies named in § 300.175(b). Each agency shall designate a member to the team and sufficient alternates...

  1. Perspectives of planning from the point of view of professional Family Health Strategy.

    Directory of Open Access Journals (Sweden)

    Polyana da Costa RIBEIRO

    2015-02-01

    Full Text Available The article looks at similarities and differences of the community diagnosis within the local planning of family health teams in Teresina. Was based on case study and focus group with teams belonging to the same territorial basis, involving hospital, health center of urban and rural area. Discusses three analytical dimensions: planning process, diagnosis in the planning of health teams and facilities/limits. It was evidenced that the planning is in its incipient, short-term, individualized and unsatisfactory demand needs. The interventions of the social actors have not involved sustainable actions, reflecting the verticality of the programmes and of distortions in the deployment process of the teams. Urge vigilance to managers with the organizational foundation of primary care, which is the diagnosis, in addition to implementing strategies for men’s health, adolescent, bedridden and caregivers and collective education, neglected.

  2. Speeding Up Team Learning.

    Science.gov (United States)

    Edmondson, Amy; Bohmer, Richard; Pisano, Gary

    2001-01-01

    A study of 16 cardiac surgery teams looked at how the teams adapted to new ways of working. The challenge of team management is to implement new processes as quickly as possible. Steps for creating a learning team include selecting a mix of skills and expertise, framing the challenge, and creating an environment of psychological safety. (JOW)

  3. The Best Laid Plans: An Examination of School Plan Quality and Implementation in a School Improvement Initiative

    Science.gov (United States)

    Strunk, Katharine O.; Marsh, Julie A.; Bush-Mecenas, Susan C.; Duque, Matthew R.

    2016-01-01

    Purpose: A common strategy used in school improvement efforts is a mandated process of formal planning, yet little is known about the quality of plans or the relationship between plan quality and implementation. This mixed-methods article investigates plan quality, factors associated with plan quality, and the relationship between plan quality and…

  4. EG and G Idaho environmental protection implementation plan

    International Nuclear Information System (INIS)

    Stump, R.C.

    1989-11-01

    This report describes the EG ampersand G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.0 Additionally, this report is intended to supplement the Department of Energy -- Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 3 figs., 1 tab

  5. Team management as a condition for the implementation of competency management training of future specialists

    OpenAIRE

    Драч, Ірина Іванівна

    2015-01-01

    The article described the specific features that define the independent status of the competence-based management training of future specialists in the management of educational activities. The use of principles of team in the implementation of a new management paradigm is justified. The advantages of using a matrix organizational structure are characterized

  6. Planning for implementation in a volunteer process

    International Nuclear Information System (INIS)

    Tweed, Cherry

    2014-01-01

    The framework for implementing geological disposal of the UK's higher activity radioactive wastes is laid out in the Managing Radioactive Waste Safely (MRWS) White Paper published by the UK Government in June 2008. The process to site a facility is to be staged and based on voluntarism and partnership with local communities. This process is in its early stages and this paper outlines the work being undertaken by the Nuclear Decommissioning Authority's Radioactive Waste Management Directorate (NDA-RWMD), the implementing body for geological disposal in the UK, to plan, along with others, how to deal with the waste and get it safely underground. It describes how the work programme has been developed, how the safety is demonstrated, how to provide packaging advice and develop the organisation. The processes used to build confidence in these plans are also presented

  7. Planning and Preparation for CD-ROM Implementation: The Citadel Library.

    Science.gov (United States)

    Maynard, J. Edmund

    Management guidelines for library planning and a strategic planning program profile based on the literature were used in the planning process for implementing access to databases on CD-ROM at the Daniel Library of the Citadel, Military College of South Carolina. According to this model, the planning process would consist of five stages: (1)…

  8. The human side of lean teams.

    Science.gov (United States)

    Wackerbarth, Sarah B; Strawser-Srinath, Jamie R; Conigliaro, Joseph C

    2015-05-01

    Organizations use lean principles to increase quality and decrease costs. Lean projects require an understanding of systems-wide processes and utilize interdisciplinary teams. Most lean tools are straightforward, and the biggest barrier to successful implementation is often development of the team aspect of the lean approach. The purpose of this article is to share challenges experienced by a lean team charged with improving a hospital discharge process. Reflection on the experience provides an opportunity to highlight lessons from The Team Handbook by Peter Scholtes and colleagues. To improve the likelihood that process improvement initiatives, including lean projects, will be successful, organizations should consider providing training in organizational change principles and team building. The authors' lean team learned these lessons the hard way. Despite the challenges, the team successfully implemented changes throughout the organization that have had a positive impact. Training to understand the psychology of change might have decreased the resistance faced in implementing these changes. © 2014 by the American College of Medical Quality.

  9. Using Quality Improvement Methods to Implement an Electronic Medical Record (EMR) Supported Individualized Home Pain Management Plan for Children with Sickle Cell Disease.

    Science.gov (United States)

    Crosby, Lori E; Simmons, Kenya; Kaiser, Peggy; Davis, Blair; Boyd, Patricia; Eichhorn, Tiffany; Mahaney, Tracy; Joffe, Naomi; Morgan, Darice; Schibler, Kathy; Anderson, Viia; Quinn, Charles T; Kalinyak, Karen A

    2014-05-01

    Using quality improvement methodology, our goal was to develop and implement individualized home pain management plans (HPMP) that included pharmacologic as well as non-pharmacologic strategies for children with sickle cell disease (SCD). We hypothesized that successfully implemented HPMPs would have an impact on Emergency Department (ED) use, decreasing ED visits for uncomplicated SCD pain episodes. A multidisciplinary quality improvement team developed a questionnaire to assess the frequency, location and severity of a patient's pain during a routine, comprehensive visit in order to help the patient and family develop an effective pain management strategy using both pharmacologic and non-pharmacologic actions. Using plan do study act cycles (PDSAs), this team was able to build this process into the daily workflow for all SCD patients age 5 years to 21 years of age. Patients with comprehensive visits scheduled from January 2012 to May 2013 were included (N=188) in the intervention. By May of 2013, 88% of eligible patients had an individualized HPMP in place. There was a concomitant reduction in the percentage of SCD patients seen in the ED for uncomplicated SCD pain (6.9% vs. 1.1%). Using quality improvement methods, an individualized HPMP intervention was incorporated successfully into the daily workflow of a busy outpatient SCD clinic. This intervention has the potential to improve patient outcomes by decreasing avoidable ED visits as well as reducing overall healthcare costs.

  10. Fostering teachers' team learning

    NARCIS (Netherlands)

    Bouwmans, Machiel; Runhaar, Piety; Wesselink, Renate; Mulder, Martin

    2017-01-01

    The implementation of educational innovations by teachers seems to benefit from a team approach and team learning. The study's goal is to examine to what extent transformational leadership is associated with team learning, and to investigate the mediating roles of participative decision-making,

  11. Increasing In-Service Teacher Implementation of Classroom Management Practices through Consultation, Implementation Planning, and Participant Modeling

    Science.gov (United States)

    Hagermoser Sanetti, Lisa M.; Williamson, Kathleen M.; Long, Anna C. J.; Kratochwill, Thomas R.

    2018-01-01

    Numerous evidence-based classroom management strategies to prevent and respond to problem behavior have been identified, but research consistently indicates teachers rarely implement them with sufficient implementation fidelity. The purpose of this study was to evaluate the effectiveness of implementation planning, a strategy involving logistical…

  12. Impact of a mobile health aplication in the nursing care plan compliance of a home care service in Belo Horizonte, Minas Gerais, Brazil.

    Science.gov (United States)

    de Britto, Felipe A; Martins, Tatiana B; Landsberg, Gustavo A P

    2015-01-01

    To assess impact of a mobile health solution in the nursing care plan compliance of a home care service. A retrospective cohort study was performed with 3,036 patients. Compliance rates before and after the implementation were compared. After the implementation of a mobile health aplication, compliance with the nursing care plan increased from 53% to 94%. The system reduced IT spending, increased the nursing team efficiency and prevented planned hiring. The use of a mobile health solution with geolocating feature by a nursing home care team increased compliance to the care plan.

  13. Toward Learning Teams

    DEFF Research Database (Denmark)

    Hoda, Rashina; Babb, Jeff; Nørbjerg, Jacob

    2013-01-01

    to sacrifice learning-focused practices. Effective learning under pressure involves conscious efforts to implement original agile practices such as retrospectives and adapted strategies such as learning spikes. Teams, their management, and customers must all recognize the importance of creating learning teams......Today's software development challenges require learning teams that can continuously apply new engineering and management practices, new and complex technical skills, cross-functional skills, and experiential lessons learned. The pressure of delivering working software often forces software teams...

  14. Plan for implementing EPA standards for UMTRA sites

    International Nuclear Information System (INIS)

    1984-01-01

    This plan is designed to be a generic presentation on methodology that will be followed in implementing the EPA standards. Its applicability covers 24 inactive uranium mill tailings sites and approximately 8000 vicinity properties, no two of which are alike. This diversity dictates the more general approach of this plan. In practice, however, site-specific application will be implemented and will require extensive consultation with the appropriate state or tribe and the NRC. In addition, information concerning relevant Federal, state, or tribal standards and regulations will be considered along with any data that may assist in the evaluations. Throughout this process, DOE will encourage state and tribal participation to ensure that compliance with the EPA standards will be achieved

  15. 78 FR 54835 - Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead...

    Science.gov (United States)

    2013-09-06

    ... 4] Air Quality Implementation Plan; Alabama; Attainment Plan for the Troy Area 2008 Lead... Troy 2008 Lead nonattainment area (hereafter referred to as the ``Troy Area'' or ``Area''). The Troy... submittal regarding the attainment plan based on Alabama's attainment demonstration for the Troy Area. The...

  16. Evaluation of the effectiveness of the implementation of power plans in Kenya

    Energy Technology Data Exchange (ETDEWEB)

    Ruwah, N.; Chang, C., E-mail: ndumzilla@email.kings.ac.kr, E-mail: ckchang@kings.ac.kr [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-07-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  17. Evaluation of the effectiveness of the implementation of power plans in Kenya

    International Nuclear Information System (INIS)

    Ruwah, N.; Chang, C.

    2014-01-01

    The purpose of this research is to make an in depth analysis on why developing countries do not seem to move forward towards electric energy security as projected in their energy plans. It is evident that electric energy plan in developing countries do not work very well. Is it because of poor planning or is it due to poor implementation? This research was done with Kenya as the case study. The primary data collection method was interviews of electric energy planners in Kenya. Least cost power development plans and electric energy plans were assessed and compared to what has been actually implemented, according to the plans. After the problem analysis, this research aims at finding possible solutions to the problems. The solutions to be proposed shall be aimed at advising the developing countries' governments, the electric energy planners and policy makers and the relevant stakeholders on the best planning and implementation strategies. (author)

  18. Comparative analysis of elements and models of implementation in local-level spatial plans in Serbia

    Directory of Open Access Journals (Sweden)

    Stefanović Nebojša

    2017-01-01

    Full Text Available Implementation of local-level spatial plans is of paramount importance to the development of the local community. This paper aims to demonstrate the importance of and offer further directions for research into the implementation of spatial plans by presenting the results of a study on models of implementation. The paper describes the basic theoretical postulates of a model for implementing spatial plans. A comparative analysis of the application of elements and models of implementation of plans in practice was conducted based on the spatial plans for the local municipalities of Arilje, Lazarevac and Sremska Mitrovica. The analysis includes four models of implementation: the strategy and policy of spatial development; spatial protection; the implementation of planning solutions of a technical nature; and the implementation of rules of use, arrangement and construction of spaces. The main results of the analysis are presented and used to give recommendations for improving the elements and models of implementation. Final deliberations show that models of implementation are generally used in practice and combined in spatial plans. Based on the analysis of how models of implementation are applied in practice, a general conclusion concerning the complex character of the local level of planning is presented and elaborated. [Project of the Serbian Ministry of Education, Science and Technological Development, Grant no. TR 36035: Spatial, Environmental, Energy and Social Aspects of Developing Settlements and Climate Change - Mutual Impacts and Grant no. III 47014: The Role and Implementation of the National Spatial Plan and Regional Development Documents in Renewal of Strategic Research, Thinking and Governance in Serbia

  19. Strategic planning, implementation, and evaluation processes in hospital systems: a survey from Iran.

    Science.gov (United States)

    Sadeghifar, Jamil; Jafari, Mehdi; Tofighi, Shahram; Ravaghi, Hamid; Maleki, Mohammad Reza

    2014-09-28

    Strategic planning has been presented as an important management practice. However, evidence of its deployment in healthcare systems in low-income and middle-income countries (LMICs) is limited. This study investigated the strategic management process in Iranian hospitals. The present study was accomplished in 24 teaching hospitals in Tehran, Iran from September 2012 to March 2013. The data collection instrument was a questionnaire including 130 items. This questionnaire measured the situation of formulation, implementation, and evaluation of strategic plan as well as the requirements, facilitators, and its benefits in the studied hospitals. All the investigated hospitals had a strategic plan. The obtained percentages for the items "the rate of the compliance to requirements" and "the quantity of planning facilitators" (68.75%), attention to the stakeholder participation in the planning (55.74%), attention to the planning components (62.22%), the status of evaluating strategic plan (59.94%) and the benefits of strategic planning for hospitals (65.15%) were in the medium limit. However, the status of implementation of the strategic plan (53.71%) was found to be weak. Significant statistical correlations were observed between the incentive for developing strategic plan and status of evaluating phase (P=0.04), and between status of implementation phase and having a documented strategic plan (P=0.03). According to the results, it seems that absence of appropriate internal incentive for formulating and implementing strategies led more hospitals to start formulation strategic planning in accordance with the legal requirements of Ministry of Health. Consequently, even though all the investigated hospital had the documented strategic plan, the plan has not been implemented efficiently and valid evaluation of results is yet to be achieved.

  20. Smart meter implementation plan : report of the Board to the Minister

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides detailed information about Ontario's smart meter implementation plan. The smart metering system will measure how much electricity a customer uses on an hourly basis, with data being transferred daily to local electricity distributors. Energy prices will vary according to the time of day when energy was being consumed, a system that supports current methods of charging larger customers. The plan proposes that all new and existing customers in Ontario have some type of smart meter by 2010 as part of a two-phased plan. Customers will receive timely information on consumption, and distributors will offer variable pricing plans. It was advised that costs be included in the distribution rate immediately upon installation of smart meters. Detailed information on implementation, smart metering costs, minimum requirements, and non-commodity time of use rates were presented. Critical tasks for establishing a framework for implementation included: ministerial approval of the plan; identification of a program coordinator; the establishment of a correct regulatory framework; a vendor approval process requiring appropriate permissions for radio frequency licences; technology pilots on behalf of distributors to assure adequate adaptation and the development of procedures concerning procurement, internal schedules and deployment; coordination between government, regulatory bodies and distributors towards the establishment of communication strategies, implementation plans and distributor approaches. 5 tabs., 6 figs

  1. The productivity effects of profit sharing, employee ownership, stock option and team incentive plans: Evidence from korean panel data

    OpenAIRE

    Kato, Takao; Lee, Ju Ho; Ryu, Jang-soo

    2010-01-01

    We report the first results for Korean firms on the incidence, diffusion, scope and effects of diverse employee financial participation schemes, such as Profit Sharing Plans (PSPs), Employee Stock Ownership Plans (ESOPs), Stock Option Plans (SOPs) and Team Incentive Plans (TIPs). In do doing, we assemble important new panel data by merging data from a survey of all Korean firms listed on Korean Stock Exchange which enjoys an unusually high response rate of 60 percent with accounting data from...

  2. Environmental Restoration Contractor Resource Conservation and Recovery Act Permit Implementation Plan

    International Nuclear Information System (INIS)

    Lewis, R.A.

    1996-05-01

    This document contains the revised Environmental Restoration Contractor (ERC) Implementation Plan for compliance with the Dangerous Waste and Hazardous and Solid Waste Amendment portions of the Resource Conservation and Recovery Act (RCRA) Permit for the Treatment, Storage, and Disposal of Dangerous Waste (hereafter referred to as the open-quotes Permitclose quotes). The Permit became effective on September 28, 1994. The ERC has developed the Permit Implementation Plan to ensure that the Permit is properly implemented within the ERC project and functions. The plan contains a list of applicable permit conditions, descriptions, responsible organizations, and the status of compliance. The ERC's responsibilities for Permit implementation are identified within both project and functional organizations. Project Managers are responsible for complying with conditions specific to a particular treatment, storage, or disposal (TSD) unit. TSD-specific compliance in include items such as closure plan deliverables, reporting and record keeping requirements, or compliance with non-unit-specific tasks such as spill reporting and emergency response. Functional organizations are responsible for sitewide activities, such as coordinating Permit modifications and developing personnel training programs

  3. Impact of the lung oncology multidisciplinary team meetings on the management of patients with cancer.

    Science.gov (United States)

    Ung, Kim Ann; Campbell, Belinda A; Duplan, Danny; Ball, David; David, Steven

    2016-06-01

    Multidisciplinary team (MDT) meetings are increasingly regarded as a component of multidisciplinary cancer care. We aimed to prospectively measure the impact of MDT meetings on clinicians' management plans for lung oncology patients, and the implementation rate of the meeting recommendations. Consecutive patient cases presented at the weekly lung oncology MDT meetings were prospectively enrolled. Investigators compared the clinicians' management plans pre-meeting with the consensus plans post-meeting. The meeting was considered to have an impact on management plans if ≥1 of the following changes were detected: tumor stage, histology, treatment intent or treatment modality, or if additional investigations were recommended. Investigators reviewed hospital patient records at 4 months to determine if the meeting recommendations were implemented. Reasons for non-implementation were also recorded. Of the 55 eligible cases, the MDT meeting changed management plans in 58% (CI 45-71%; P management plans for lung oncology patients. The majority of MDT recommendations (72%) were implemented into patient care. These findings provide further evidence to support the role of MDT meetings as an essential part of the decision-making process for the optimal multidisciplinary management of patients with cancer. © 2014 Wiley Publishing Asia Pty Ltd.

  4. Implementing critical pathways and a multidisciplinary team approach to cardiovascular disease management.

    Science.gov (United States)

    Peterson, Eric D; Albert, Nancy M; Amin, Alpesh; Patterson, J Herbert; Fonarow, Gregg C

    2008-09-08

    According to several medical registries, there is a need to improve the care of post-myocardial infarction (MI) patients, especially those with left ventricular dysfunction (LVD) and heart failure. This can potentially be achieved by implementing disease management programs, which include critical pathways, patient education, and multidisciplinary hospital teams. Currently, algorithms for critical pathways, including discharge processes, are lacking for post-MI LVD patients. Such schemes can increase the use of evidence-based medicines proved to reduce mortality. Educational programs are aimed at increasing patients' awareness of their condition, promoting medication compliance, and encouraging the adoption of healthy behaviors; such programs have been shown to be effective in improving outcomes of post-MI LVD patients. Reductions in all-cause hospitalizations and medical costs as well as improved survival rates have been observed when a multidisciplinary team (a nurse, a pharmacist, and a hospitalist) is engaged in patient care. In addition, the use of the "pay for performance" method, which can be advantageous for patients, physicians, and hospitals, may potentially improve the care of post-MI patients with LVD.

  5. An assessment of implementation and evaluation phases of strategic plans in Iranian hospitals.

    Science.gov (United States)

    Sadeghifar, Jamil; Tofighi, Shahram; Roshani, Mohamad; Toulideh, Zahra; Mohsenpour, Seyedramezan; Jafari, Mehdi

    2017-01-01

    To assess the implementation and evaluation phases of strategic plans in selected hospitals. We conducted a cross-sectional study of implementation and evaluation of strategic plan in 24 hospitals in 2015, using a questionnaire which consisted of two separate sections for strategic implementation and strategic evaluation. Data were analyzed with SPSS version 18. Nearly one-third of hospitals claimed that they allocate their budget based on priorities and strategic goals. However, it turned out that although goals had been set, no formal announcements had been made. Most of the hospitals stated that they used measures when evaluating the plan. For hospital staff, clarifying the hospital's priorities was the most important advantage of a strategic plan. There is no clear definition for strategic management in Iranian hospitals, which results in chaotic implementation and control of strategic planning.

  6. National Response Team

    Science.gov (United States)

    Response planning and coordination (not direct response itself) is accomplished at the federal level through the U.S. National Response Team (NRT), an interagency group co-chaired by EPA and U.S. Coast Guard. NRT distributes information, plans, and trains.

  7. Improving reliability in south Ajax with IntelliTEAM

    Energy Technology Data Exchange (ETDEWEB)

    Starck, A.P. [Veridian Connections Inc., Ajax, ON (Canada)

    2010-07-01

    Veridian Connections Incorporated is a local electricity distribution company in Ontario that is faced with end of life feeder cables and an aging system. Most of the feeders are combined overhead and underground cables supplied from several substations with a limited transfer capability. The commercial activity in the utility's service area is intolerant to sustained outages. Although the initial plan was to replace the cables, capital and time constraints led the utility to chose the IntelliTEAM 2 system to improve reliability, by reducing the frequency, duration and impact of outages. The unique system is based on submersible switchgear, PulseClosing and includes the substation breakers as IntelliTEAM devices. The current plan to implement a smart grid turns sustained outages into momentary outages; reduces the number of customers affected by a sustained failure; improves the ability to transfer loads; and reduces stresses on aged cables. The self healing system restores customers in less than a minute and provides visibility to SCADA operators through a high speed SpeedNet radio system. tabs., figs.

  8. Can staff attitudes to team working in stroke care be improved?

    Science.gov (United States)

    Gibbon, Bernard; Watkins, Caroline; Barer, David; Waters, Karen; Davies, Steve; Lightbody, Liz; Leathley, Michael

    2002-10-01

    Teamwork is regarded as the cornerstone of rehabilitation. It is recognized that the skills of a multiprofessional team are required to provide the care and interventions necessary to maximize the patient's potential to recover from his/her stroke. Critical evaluation of team working is lacking in the literature. Indeed, there is no consensus on a precise definition of teamwork or on the best way of implementing it, beyond a general exhortation to members to work to the same therapeutic plan in a cohesive manner. The literature has highlighted many problems in team working, including petty jealousies, ignorance and a perceived loss of autonomy and threat to professional status. To determine if the use of team co-ordinated approaches to stroke care and rehabilitation would improve staff attitudes to team working. A pre-post design was adopted using 'The Team Climate Inventory' to explore attitudes to team working before and after introducing the interventions. Local Research Ethics Committee approval was obtained. Improvements in attitudes towards team working suggest that the introduction of team co-ordinated approaches (integrated care pathways and team notes) did not result in greater team working. The introduction of an integrated care pathway and team notes is based on an assumption that they would enhance team working. The results suggest that the introduction of team co-ordinated approaches (team notes and care pathways) do not improve attitudes to team working, teams appear to take a long time to establish cohesion and develop shared values.

  9. Implementation of BNCT treatment planning procedures

    International Nuclear Information System (INIS)

    Capala, J.; Ma, R.; Diaz, A.Z.; Chanana, A.D.; Coderre, J.A.

    2001-01-01

    Estimation of radiation doses delivered during boron neutron capture therapy (BNCT) requires combining data on spatial distribution of both the thermal neutron fluence and the 10 B concentration, as well as the relative biological effectiveness of various radiation dose components in the tumor and normal tissues. Using the treatment planning system created at Idaho National Engineering and Environmental Laboratory and the procedures we had developed for clinical trials, we were able to optimize the treatment position, safely deliver the prescribed BNCT doses, and carry out retrospective analyses and reviews. In this paper we describe the BNCT treatment planning process and its implementation in the ongoing dose escalation trials at Brookhaven National Laboratory. (author)

  10. Interview: Mr. Stephen Chee, team leader, UNFPA country support team (CST) for the South Pacific.

    Science.gov (United States)

    1993-09-01

    The UNFPA country support team (CST) for the South Pacific is the action-arm at the regional level of the new Technical Support Services arrangement introduced by the agency. Operational since April 1993, the CST currently covers the following Pacific island countries or territories: the Cook Islands, the Federated States of Micronesia, Fiji, Kiribati, Marshall Islands, Nauru, Niue, Palau, Papua New Guinea, Samoa, Solomon Islands, Tokelau, Tonga, Tuvalu, and Vanuatu. The CST office is located in Suva, Fiji, with the main goal of strengthening national capacity and building self-reliance in the countries of the region. The office in Suva is currently staffed by six highly qualified advisors with extensive experience in the population and related fields; two more advisors are expected to join the Team in early 1994. The Team is well equipped to provide countries and territories of the region with a wide range of technical support services ranging from ad hoc technical advisory services to the conceptualization and development of comprehensive population policies and programs. Services are offered in the areas of basic data collection, processing, and research in population dynamics; population policy formulation, evaluation, and implementation; family planning and maternal-child health; information, education, and communication; women in population and development; and population program management. The team also plays an advocacy role in mainstreaming population concerns into the programs and activities of international, regional, and national organizations. The team leader responds to questions about population problems experienced by the countries served, the scope of UNFPA assistance to country governments in the subregion, the importance of population information in the subregion, and how Asia-Pacific POPIN may help the team and countries served.

  11. A framework to assess plan implementation maturity with an application to flood management in Vietnam

    NARCIS (Netherlands)

    Phi, Ho Long; Hermans, L.M.; Douven, W.J.A.M.; Halsema, Van G.E.; Khan, Malik Fida

    2015-01-01

    Implementation failure is a long-known Achilles’ heel of water and flood management plans. Contemporary planning approaches address the implementation challenge by using more participatory planning processes to ensure support for plans, assuming that this support will also benefit plan

  12. Bird Conservation Planning and Implementation in Canada's Intermountain Region

    Science.gov (United States)

    Ilia Hartasanchez; Krista De Groot; Andre Breault; Rob W. Butler

    2005-01-01

    Bird conservation planning in British Columbia and Yukon has been carried out by each of the major bird initiatives. The purpose of this paper is to provide a status report of planning activities and to discuss how integration of the initiatives is being accomplished for efficient and effective implementation of bird conservation actions.

  13. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  14. 76 FR 15 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2011-01-03

    ... Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading... revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking and...

  15. Watershed planning, implementation and assessment: the May River Watershed Action Plan case study

    Science.gov (United States)

    Kimberly W. Jones; Christopher L. Ellis; Jeremy S. Ritchie

    2016-01-01

    Prior to exponential growth in the early to mid-2000s, the Town of Bluffton, SC was one square mile; as of 2015, it is approximately 55 square miles. Associated with this growth was a shellfish harvesting closure for nearly onethird of the May River in 2009. The Town and its partners developed and began to implement the May River Watershed Action Plan in 2011. The plan...

  16. Program Development Plan and Team up; FINAL

    International Nuclear Information System (INIS)

    Solar Electric Power Association

    2001-01-01

    The final summary report is a comprehensive view of TEAM-UP, with documented data, information, and experiences that SEPA has collected throughout the program, including lessons learned by participating ventures, and sections covering costs and other information on both large and small systems. This report also covers the barriers that TEAM-UP faced to PV commercialization at the beginning of the program, barriers the project was able to remove or reduce, and what barriers remain on the road ahead

  17. Three images of interdisciplinary team meetings.

    Science.gov (United States)

    Crepeau, E B

    1994-08-01

    Teams are an essential aspect of health care today, especially in rehabilitation or chronic illness where the course of care is frequently long, complex, and unpredictable. The coordinative function of teams and their interdisciplinary aspects are thought to improve patient care because team members bring their unique professional skills together to address patient problems. This coordination is enacted through the team meeting, which typically results in an integrated care plan. This professional image of team meetings is explicit and addresses the description and provision of care as objective and rational activities. In contrast, the constructed and ritualistic images of health care team meetings are implicit and concern the less objective and rational aspects of planning care. The constructed image pertains to the definitional activity of team members as they try to understand patient troubles and achieve consensus. This process involves the individual clinical reasoning of team members and the collective reasoning of the group. The ritualistic image is that aspect of team meetings in which the team affirms and reaffirms its collective identity. Drawing from field research of geropsychiatric team meetings, this article defines and explicates these images, focusing on the constructed and ritualistic aspects of team meetings and the influence of these images on group function.

  18. Strategies to overcome barriers to implementing osteoporosis and fracture prevention guidelines in long-term care: a qualitative analysis of action plans suggested by front line staff in Ontario, Canada.

    Science.gov (United States)

    Alamri, Sultan H; Kennedy, Courtney C; Marr, Sharon; Lohfeld, Lynne; Skidmore, Carly J; Papaioannou, Alexandra

    2015-08-01

    Osteoporosis is a major global health problem, especially among long-term care (LTC) facilities. Despite the availability of effective clinical guidelines to prevent osteoporosis and bone fractures, few LTC homes actually adhere to these practical recommendations. The purpose of this study was to identify barriers to the implementation of evidence-based practices for osteoporosis and fracture prevention in LTC facilities and elicit practical strategies to address these barriers. We performed a qualitative analysis of action plans formulated by Professional Advisory Committee (PAC) teams at 12 LTC homes in the intervention arm of the Vitamin D and Osteoporosis Study (ViDOS) in Ontario, Canada. PAC teams were comprised of medical directors, administrators, directors of care, pharmacists, dietitians, and other staff. Thematic content analysis was performed to identify the key themes emerging from the action plans. LTC teams identified several barriers, including lack of educational information and resources prior to the ViDOS intervention, difficulty obtaining required patient information for fracture risk assessment, and inconsistent prescribing of vitamin D and calcium at the time of admission. The most frequently suggested recommendations was to establish and adhere to standard admission orders regarding vitamin D, calcium, and osteoporosis therapies, improve the use of electronic medical records for osteoporosis and fracture risk assessment, and require bone health as a topic at quarterly reviews and multidisciplinary conferences. This qualitative study identified several important barriers and practical recommendations for improving the implementation of osteoporosis and fracture prevention guidelines in LTC settings.

  19. Enterprise resource planning in a large construction firm: Implementation analysis

    NARCIS (Netherlands)

    Voordijk, Johannes T.; van Leuven, Arjen; Laan, Albertus

    2003-01-01

    In most large Dutch construction firms, Enterprise Resource Planning (ERP) systems have replaced nonintegrated information systems with integrated and maintainable software. The implementation of ERP systems in such firms is a difficult task. So far, ERP implementations have yielded more failures

  20. Identifying gaps, barriers, and solutions in implementing pressure ulcer prevention programs.

    Science.gov (United States)

    Jankowski, Irene M; Nadzam, Deborah Morris

    2011-06-01

    Patients continue to suffer from pressure ulcers (PUs), despite implementation of evidence-based pressure ulcer (PU) prevention protocols. In 2009, Joint Commission Resources (JCR) and Hill-Rom created the Nurse Safety Scholar-in-Residence (nurse scholar) program to foster the professional development of expert nurse clinicians to become translators of evidence into practice. The first nurse scholar activity has focused on PU prevention. Four hospitals with established PU programs participated in the PU prevention implementation project. Each hospital's team completed an inventory of PU prevention program components and provided copies of accompanying documentation, along with prevalence and incidence data. Site visits to the four participating hospitals were arranged to provide opportunities for more in-depth analysis and support. Following the initial site visit, the project team at each hospital developed action plans for the top three barriers to PU program implementation. A series of conference calls was held between the site visits. Pressure Ulcer Program Gaps and Recommendations. The four hospitals shared common gaps in terms of limitations in staff education and training; lack of physician involvement; limited involvement of unlicensed nursing staff; lack of plan for communicating at-risk status; and limited quality improvement evaluations of bedside practices. Detailed recommendations were identified for addressing each of these gaps. these Recommendations for eliminating gaps have been implemented by the participating teams to drive improvement and to reduce hospital-acquired PU rates. The nurse scholars will continue to study implementation of best practices for PU prevention.

  1. 78 FR 48326 - Partial Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements

    Science.gov (United States)

    2013-08-08

    ... Disapproval of State Implementation Plan; Arizona; Regional Haze Requirements AGENCY: Environmental Protection... behalf of National Parks Conservation Association, Sierra Club, Physicians for Social Responsibility... Haze State Implementation Plan Revision submitted by the Arizona Department of Environmental Quality on...

  2. EG and G Idaho Environmental Protection Implementation Plan (1990)

    Energy Technology Data Exchange (ETDEWEB)

    Wickham, L.E.

    1990-11-01

    This report describes the EG G Idaho strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy--Idaho Operations Office (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  3. EG and G Idaho Environmental Protection Implementation Plan (1991)

    Energy Technology Data Exchange (ETDEWEB)

    Graham, J.F.

    1991-11-01

    This report describes the EG G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG G Idaho Environmental Protection Program activities. This report describes the current status of the EG G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab.

  4. EG and G Idaho Environmental Protection Implementation Plan (1991)

    International Nuclear Information System (INIS)

    Graham, J.F.

    1991-11-01

    This report describes the EG ampersand G Idaho, Inc. strategy for implementation of the Department of Energy (DOE) Order 5400.1 (a DOE-Headquarters directive establishing environmental protection program requirements, authorities, and responsibilities). Preparation of this Environmental Protection Implementation Plan is a requirement of DOE Order 5400.1. Additionally, this report is intended to supplement the Department of Energy -- Field Office Idaho (DOE-ID) Environmental Protection Implementation Plan by detailing EG ampersand G Idaho Environmental Protection Program activities. This report describes the current status of the EG ampersand G Idaho Program, and the strategies for enhancing, as necessary, the current program to meet the requirements of DOE Order 5400.1. Aspects of the Environmental Protection Program included in this report are the assignment of responsibilities to specific EG ampersand G Idaho organizations, a schedule for completion of enhancements, if necessary, and requirements for documentation and reporting. 4 figs., 1 tab

  5. Conservation Action Planning: Lessons learned from the St. Marys River watershed biodiversity conservation planning process

    Science.gov (United States)

    Patterson, Tamatha A.; Grundel, Ralph

    2014-01-01

    Conservation Action Planning (CAP) is an adaptive management planning process refined by The Nature Conservancy (TNC) and embraced worldwide as the Open Standards for the Practice of Conservation. The CAP process facilitates open, multi-institutional collaboration on a common conservation agenda through organized actions and quantified results. While specifically designed for conservation efforts, the framework is adaptable and flexible to multiple scales and can be used for any collaborative planning effort. The CAP framework addresses inception; design and development of goals, measures, and strategies; and plan implementation and evaluation. The specific components of the CAP include defining the project scope and conservation targets; assessing the ecological viability; ascertaining threats and surrounding situation; identifying opportunities and designing strategies for action; and implementing actions and monitoring results. In 2007, TNC and a multidisciplinary graduate student team from the University of Michigan's School of Natural Resources and Environment initiated a CAP for the St. Marys River, the connecting channel between Lake Superior and Lake Huron, and its local watershed. The students not only gained experience in conservation planning, but also learned lessons that notably benefited the CAP process and were valuable for any successful collaborative effort—a dedicated core team improved product quality, accelerated the timeline, and provided necessary support for ongoing efforts; an academic approach in preparation for engagement in the planning process brought applicable scientific research to the forefront, enhanced workshop facilitation, and improved stakeholder participation; and early and continuous interactions with regional stakeholders improved cooperation and built a supportive network for collaboration.

  6. Reported implementation lessons from a national quality improvement initiative; Productive Ward: Releasing Time to Care™. A qualitative, ward-based team perspective.

    Science.gov (United States)

    White, Mark; Butterworth, Tony; Wells, John S G

    2017-10-01

    To explore the experiences of participants involved in the implementation of the Productive Ward: Releasing Time to Care™ initiative in Ireland, identifying key implementation lessons. A large-scale quality improvement programme Productive Ward: Releasing Time to Care™ was introduced nationwide into Ireland in 2011. We captured accounts from ward-based teams in an implementation phase during 2013-14 to explore their experiences. Semi-structured, in-depth interviews with a purposive sample of 24 members of ward-based teams from nine sites involved in the second national phase of the initiative were conducted. Interviews were analysed and coded under themes, using a seven-stage iterative process. The predominant theme identified was associated with the implementation and management of the initiative and included: project management; training; preparation; information and communication; and participant's negative experiences. The most prominent challenge reported related to other competing clinical priorities. Despite the structured approach of Productive Ward: Releasing Time to Care™, it appears that overstretched and busy clinical environments struggle to provide the right climate and context for ward-based teams to engage and interact actively with quality improvement tools, methods and activities. Findings highlight five key aspects of implementation and management that will help facilitate successful adoption of large-scale, ward-based quality improvement programmes such as Productive Ward: Releasing Time to Care™. Utilising pre-existing implementation or quality frameworks to assess each ward/unit for 'readiness' prior to commencing a quality improvement intervention such as Productive Ward: Releasing Time to Care™ should be considered. © 2017 John Wiley & Sons Ltd.

  7. Systems engineering implementation plan for the liquid effluents services program

    International Nuclear Information System (INIS)

    Lowe, S.S.

    1995-01-01

    A graded approach is being taken by the Liquid Effluents Services Program in implementing systems engineering because of the advanced state of the program. The approach is cost-effective and takes credit for related work already completed, yet retains the benefits of systems engineering. This plan describes how the Liquid Effluents Services Program will implement systems engineering so there is a common understanding. Systems engineering work to be performed and the products of that work are identified. The relation to the current planning process and integration with the sitewide systems engineering effort is described

  8. Implementing the leadership development plans of faculty education fellows: a structured approach.

    Science.gov (United States)

    Goldman, Ellen F; Wesner, Marilyn; Karnchanomai, Ornpawee; Haywood, Yolanda

    2012-09-01

    The literature about medical education faculty fellowship programs, which have grown in popularity, quantifies program characteristics, provides exemplars, and reports on delivery strategies. Evaluation is generally limited to satisfaction measures, with a few longitudinal studies of postprogram achievements, but none on the process of making these changes.The authors describe the development of faculty members' postfellowship leadership plans and a structured process to support plan implementation. They also compare the implementation of initiatives specified in individual leadership development plans of two cohorts of faculty. The participants were graduates of a fellowship program at the George Washington University School of Medicine and Health Sciences. One cohort participated in a structured process of monthly reciprocal peer coaching, followed by journaling and quarterly interviews with the program director; a second cohort functioned as a comparison with no structured process supporting them. (Study years are not provided because they could inadvertently lead to the identification of the participants.) Despite similar implementation challenges expressed by both cohorts, the cohort participating in the structured process implemented 23% more of their planned initiatives, including 2 times as many educational leadership initiatives and 3.5 times as many initiatives related to developing new curriculum. The combination of plan development, reciprocal peer coaching, journaling, and interview discussions provided faculty with focus, structure, and personal support. This structured process supporting leadership plan development and implementation can be easily transferred to other fellowship programs in medical education, adapted for use with residents and fellows, and used in similar development programs.

  9. Participatory System Dynamics Modeling: Increasing Stakeholder Engagement and Precision to Improve Implementation Planning in Systems.

    Science.gov (United States)

    Zimmerman, Lindsey; Lounsbury, David W; Rosen, Craig S; Kimerling, Rachel; Trafton, Jodie A; Lindley, Steven E

    2016-11-01

    Implementation planning typically incorporates stakeholder input. Quality improvement efforts provide data-based feedback regarding progress. Participatory system dynamics modeling (PSD) triangulates stakeholder expertise, data and simulation of implementation plans prior to attempting change. Frontline staff in one VA outpatient mental health system used PSD to examine policy and procedural "mechanisms" they believe underlie local capacity to implement evidence-based psychotherapies (EBPs) for PTSD and depression. We piloted the PSD process, simulating implementation plans to improve EBP reach. Findings indicate PSD is a feasible, useful strategy for building stakeholder consensus, and may save time and effort as compared to trial-and-error EBP implementation planning.

  10. Enterprise resource planning in construction: An evaluation of recent implementations

    NARCIS (Netherlands)

    Leuven, A.; Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    In a large number of construction firms, Enterprise Resource Planning (ERP) systems have replaced non-integrated information systems by integrated and maintainable software. The implementation of ERP systems in the construction industry is a difficult task. So far, ERP implementations have yielded

  11. Development and implementation of the compensation plan for pharmacy services in Alberta, Canada.

    Science.gov (United States)

    Breault, Rene R; Whissell, Jeff G; Hughes, Christine A; Schindel, Theresa J

    To describe experiences with development and implementation of a compensation plan for pharmacy services delivered by pharmacists in community pharmacies. Community pharmacy practice in Alberta, Canada. Pharmacists in Alberta have one of the most progressive scopes of practice in North America. They have authority to prescribe drugs independently, administer drugs by injection, access electronic health records, and order laboratory tests. A publicly funded compensation plan for pharmacy services was implemented in 2012. Principles that guided development of the compensation plan aimed to 1) ensure payment for pharmacy services, 2) support pharmacists in using their full scope of practice, 3) enable the development of long-term relationships with patients, 4) facilitate expansion of services delivered by pharmacists, and 5) provide access to pharmacy services for all eligible Albertans. Services covered by the compensation plan include care planning, prescribing, and administering drugs by injection. The guiding principles were used to evaluate experiences with the compensation plan. Claims for pharmacy services covered by the compensation plan increased from 30,000 per month in July 2012 to 170,000 per month in March 2016. From September 2015 to August 2016, 1226 pharmacies submitted claims for services provided by 3901 pharmacists. The number of pharmacists with authorization to prescribe and administer injections continued to increase following implementation of the plan. Alberta's experiences with the development and implementation of the compensation plan will be of interest to jurisdictions considering implementation of remunerated pharmacy services. The potential impact of the plan on health and economic outcomes, in addition to the value of the services as perceived by the public, patients, pharmacists, and other health care providers, should also be explored. Crown Copyright © 2017. Published by Elsevier Inc. All rights reserved.

  12. The pediatrician's role in development and implementation of an Individual Education Plan (IEP) and/or an Individual Family Service Plan (IFSP). American Academy of Pediatrics. Committee on Children with Disabilities.

    Science.gov (United States)

    1999-07-01

    The Individual Education Plan and Individual Family Service Plan are legally mandated documents developed by a multidisciplinary team assessment that specifies goals and services for each child eligible for special educational services or early intervention services. Pediatricians need to be knowledgeable of federal, state, and local requirements; establish linkages with early intervention, educational professionals, and parent support groups; and collaborate with the team working with individual children.

  13. Team dynamics within quality improvement teams: a scoping review.

    Science.gov (United States)

    Rowland, Paula; Lising, Dean; Sinclair, Lynne; Baker, G Ross

    2018-03-31

    This scoping review examines what is known about the processes of quality improvement (QI) teams, particularly related to how teams impact outcomes. The aim is to provide research-informed guidance for QI leaders and to inform future research questions. Databases searched included: MedLINE, EMBASE, CINAHL, Web of Science and SCOPUS. Eligible publications were written in English, published between 1999 and 2016. Articles were included in the review if they examined processes of the QI team, were related to healthcare QI and were primary research studies. Studies were excluded if they had insufficient detail regarding QI team processes. Descriptive detail extracted included: authors, geographical region and health sector. The Integrated (Health Care) Team Effectiveness Model was used to synthesize findings of studies along domains of team effectiveness: task design, team process, psychosocial traits and organizational context. Over two stages of searching, 4813 citations were reviewed. Of those, 48 full-text articles are included in the synthesis. This review demonstrates that QI teams are not immune from dysfunction. Further, a dysfunctional QI team is not likely to influence practice. However, a functional QI team alone is unlikely to create change. A positive QI team dynamic may be a necessary but insufficient condition for implementing QI strategies. Areas for further research include: interactions between QI teams and clinical microsystems, understanding the role of interprofessional representation on QI teams and exploring interactions between QI team task, composition and process.

  14. Systems Engineering Implementation Plan for Single-Shell Tanks (SST) Retrieval Projects

    International Nuclear Information System (INIS)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-01-01

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor

  15. Systems Engineering Implementation Plan for Single Shell Tanks (SST) Retrieval Projects

    Energy Technology Data Exchange (ETDEWEB)

    LEONARD, M.W.; HOFFERBER, G.A.

    2000-11-30

    This document communicates the planned implementation of the Systems Engineering processes and products for the SST retrieval projects as defined in the Systems Engineering Management Plan for the Tank Farm Contractor.

  16. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  17. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  18. Strength in unity: the power of redesign to align the hospital team.

    Science.gov (United States)

    Bell, Anthony; Cochrane, Alastair; Courtice, Sally; Flanigan, Kathy; Mathur, Mandeep; Wilckens, Daniel

    2014-06-01

    The aim of Queen Elizabeth II Jubilee Hospital (QEII) redesign project (QEII United) was to enhance timely access to an inpatient bed and maximise opportunities to value add during the inpatient episode of care. A tripartite relationship between the hospital team, system manager and external consultants. The team, QEII United, was formed to 'diagnose, solve and implement' change under the unifying metaphorical banner of a football team. A marketing strategy and communication plan targeted the key 'players' and outlined the 'game plan'. Baseline data were collected, analysed and reported in keeping with key aims. Strategies for systems improvement implementation were attached to key performance indicators (KPIs). Thematic KPIs were developed to embed internal process change to reflect the contributions made towards the National Emergency Access Target (NEAT) at each stage of the patient journey. As such, access block of under 20%, morning discharge rates of 50% before midday, reduced length of stay for selected elective orthopaedic and general medical diagnostic related groupings (DRGs; i.e. relative stay index ≤1) and hospital in the home (HITH) utilisation rates 1.5% of all admissions were all met. Key to sustainability was the transfer of clinical redesign skills to hospital staff and the fostering of emergent ground up leadership. QEII United's success has been underpinned by the development of themed solution areas developed by the hospital staff themselves. Robust baseline data analysis used in combination with nationally available benchmarking data provided a quantitative starting point for the work. The collaborative elements of the program re-energised the hospital team, who were kept informed by targeted communications, to establish quick wins and build trust and momentum for the more challenging areas.

  19. 2016-2020 Strategic Plan and Implementing Framework

    Energy Technology Data Exchange (ETDEWEB)

    None

    2015-11-01

    The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

  20. Science in a Team Environment (AKA, How to Play Nicely with Others)

    Science.gov (United States)

    Platts, S. H.; Primeaux, L.; Swarmer, T.; Yarbough, P. O

    2017-01-01

    So you want to do NASA funded research in a spaceflight analog? There are several things about participating in an HRP managed analog that may be different from the way you normally do work in your laboratory. The purpose of this presentation is to highlight those differences and explain some of the unique aspects of doing this research. Participation in an HRP funded analog study complement, even if initially selected for funding, is not automatic and involves numerous actions from ISSMP, HRP, and the PI. There are steps that have to be taken and processes to follow before approval and ISSMP-FA integration. After the proposal and acceptance process the Investigator works closely with the Flight Analog team to ensure full integration of their study requirements into a compliment. A complement is comprised of a group of studies requiring a common platform and/or scenario that are able to be integrated on a non-interference basis for implementation. Full integration into the analog platform can be broken down into three phases: integration, preparation, and implementation. These phases occur in order with some overlap in the integration and preparation phase. The ISSMP-FA team integrates, plans and implements analog study complements. Properly defining your research requirements and getting them documented is one of the most critical components to ensure successful integration and implementation of your study, but is also one of the most likely to be neglected by PIs. Requirements that are not documented, or that are documented poorly are unlikely to get done, no matter how much you push. The process to document requirements is two-fold, consisting of an initial individual requirements integration and then a compliment requirements integration. Understanding the requirements in detail and early ensures that the science is not compromised by outside influences. This step is vital to the integration, preparation, and implementation phases. The individual requirements

  1. A randomized, controlled clinical trial of a geriatric consultation team. Compliance with recommendations.

    Science.gov (United States)

    Allen, C M; Becker, P M; McVey, L J; Saltz, C; Feussner, J R; Cohen, H J

    1986-05-16

    As part of a prospective, randomized, controlled study of the effectiveness of a geriatric consultation team, we examined compliance by the house staff with recommendations made by the team. Recommendations were formulated for 185 patients, aged 75 years or older, who were randomized into intervention (n = 92) and control (n = 93) groups. In the control group, only 27.1% of the actions that would have been recommended by the team were implemented independently by the house staff. Problems commonly neglected included polypharmacy, sensory impairment, confusion, and depression. In the intervention group, overall compliance was 71.7%. Highest compliance occurred for recommendations addressing instability and falls (95.0%) and discharge planning (94.3%). We conclude that a geriatric consultation team contributes substantial additional input into the care of older patients. Furthermore, relatively high compliance can be achieved with recommendations made by a geriatric consultation team, thereby overcoming the first barrier to the establishment of such a service.

  2. Teaming for Speech and Auditory Training.

    Science.gov (United States)

    Nussbaum, Debra B.; Waddy-Smith, Bettie

    1985-01-01

    The article suggests three strategies for the audiologist and speech/communication specialist to use in assisting the preschool teacher to implement student's individualized education program: (1) demonstration teaming, (2) dual teaming; and (3) rotation teaming. (CL)

  3. Advance Care Planning: Understanding Clinical Routines and Experiences of Interprofessional Team Members in Diverse Health Care Settings.

    Science.gov (United States)

    Arnett, Kelly; Sudore, Rebecca L; Nowels, David; Feng, Cindy X; Levy, Cari R; Lum, Hillary D

    2017-12-01

    Interprofessional health care team members consider advance care planning (ACP) to be important, yet gaps remain in systematic clinical routines to support ACP. A clearer understanding of the interprofessional team members' perspectives on ACP clinical routines in diverse settings is needed. One hundred eighteen health care team members from community-based clinics, long-term care facilities, academic clinics, federally qualified health centers, and hospitals participated in a 35-question, cross-sectional online survey to assess clinical routines, workflow processes, and policies relating to ACP. Respondents were 53% physicians, 18% advanced practice nurses, 11% nurses, and 18% other interprofessional team members including administrators, chaplains, social workers, and others. Regarding clinical routines, respondents reported that several interprofessional team members play a role in facilitating ACP (ie, physician, social worker, nurse, others). Most (62%) settings did not have, or did not know of, policies related to ACP documentation. Only 14% of settings had a patient education program. Two-thirds of the respondents said that addressing ACP is a high priority and 85% felt that nonphysicians could have ACP conversations with appropriate training. The clinical resources needed to improve clinical routines included training for providers and staff, dedicated staff to facilitate ACP, and availability of patient/family educational materials. Although interprofessional health care team members consider ACP a priority and several team members may be involved, clinical settings lack systematic clinical routines to support ACP. Patient educational materials, interprofessional team training, and policies to support ACP clinical workflows that do not rely solely on physicians could improve ACP across diverse clinical settings.

  4. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U.S. Department of Energy, Richland Operations Office (DOE-E) for implementation by B and W Hanford Company (BWC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. A status is provided for each recommendation in this document. BWHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and IUD 5480.7

  5. Problems in implementation of the spatial plan of the Republic of Srpska until 2015: Quantitative analysis

    Directory of Open Access Journals (Sweden)

    Bijelić Branislav

    2017-01-01

    Full Text Available The implementation of spatial plans in the Republic of Srpska is certainly the weakest phase of the process of spatial planning in this entity. It is particularly evident in the case of the Spatial Plan of the Republic of Srpska until 2015 which is the highest strategic spatial planning document in the Republic of Srpska. More precisely, the implementation of spatial plans has been defined as the carrying out of spatial planning documents, i.e. planning propositions as defined in the spatial plans. For the purpose of this paper, a quantitative analysis of the implementation of the planning propositions envisioned by this document has been carried out. The difference between what was planned and what was implemented at the end of the planning period (ex-post evaluation of planning decisions is presented in this paper. The weighting factor is defined for each thematic field and planning proposition, where the main criterion for determining the weighting factor is the share of the planning proposition and thematic field in the estimated total costs of the plan (financial criterion. The paper has also tackled the issue of the implementation of the Spatial Plan of Bosnia and Herzegovina for the period 1981 - 2000, as well as of the Spatial Plan of the Republic of Srpska 1996 - 2001 - Phased Plan for the period 1996 - 2001, as the previous strategic spatial planning documents of the highest rank covering the area of the Republic of Srpska. The research results have proven primary hypothesis of the paper that the level of the implementation of Spatial Plan of the Republic of Srpska until 2015 is less than 10%.

  6. AMAT guidelines. Reference document for the IAEA Ageing Management Assessment Teams (AMATs)

    International Nuclear Information System (INIS)

    1999-01-01

    Effective ageing management is an important element for ensuring the safety of nuclear power plant. The IAEA Ageing Management Assessment Team (AMAT) programme provides advice and assistance to utilities or individual NPPs to strengthen and enhance the effectiveness of ageing management programs (AMPs). Such AMPs are required by an increasing number of safety utilities and implemented by an increasing number of utilities, often as a part of NPP life or life cycle management programs that involve the integration of ageing management and economic planning. The guidelines in this report are primarily intended for IAEA-led AMAT team members as a basic structure and common reference for peer reviews of AMPs

  7. MRP (materiel requirements planning) II implementation: a case study.

    Science.gov (United States)

    Sheldon, D

    1994-05-01

    Manufacturing resource planning (MRP II) is a powerful and effective business planning template on which to build a continuous improvement culture. MRP II, when successfully implemented, encourages a disciplined yet nonthreatening environment centered on measurement and accountability. From the education that accompanies an MRP II implementation, the employees can better understand the vision and mission of the organization. This common goal keeps everyone's energy directed toward the same final objective. The Raymond Corporation is a major materiels handling equipment manufacturer headquartered in Greene, New York, with class "A" MRP II manufacturing facilities in Greene and Brantford, Ontario and an aftermark distribution facility in East Syracuse, New York. Prior to the implementation of MRP II in its Greene plant (from 1988 through 1990) good intentions and hard work were proving to be less than necessary to compete in the global market. Certified class "A" in February 1990. The Raymond Corporation has built a world-class organization from these foundations.

  8. Internal marketing within a health care organization: developing an implementation plan.

    Science.gov (United States)

    Hallums, A

    1994-05-01

    This paper discusses how the concept of internal marketing can be applied within a health care organization. In order to achieve a market orientation an organization must identify the needs and wants of its customers and how these may change in the future. In order to achieve this, internal marketing is a necessary step to the implementation of the organizations marketing strategy. An outline plan for the introduction of an internal marketing programme within an acute hospital trust is proposed. The plan identifies those individuals and departments who should be involved in the planning and implementation of the programme. The benefits of internal marketing to the Trust are also considered.

  9. Analysis of readmission rates to the intensive care unit after implementation of a rapid response team in a University Hospital.

    Science.gov (United States)

    Bergamasco E Paula, R; Tanita, M T; Festti, J; Queiroz Cardoso, L T; Carvalho Grion, C M

    2017-10-01

    To compare readmission rates to the intensive care unit (ICU) before and after the implementation of a rapid response team (RRT), and to identify risk factors for readmission. A quasi-experimental before-after study was carried out. A University Hospital. All patients discharged from the ICU from January to December 2008 (control group) and from January 2010 to December 2012 (intervention group). Implementation of an RRT. The data included demographic parameters, diagnoses upon admission, ICU readmission, APACHE II, SOFA, and TISS 28 scores, and routine daily assessment by an RRT of patients discharged from the ICU. During the study interval, 380 patients were analyzed in the period prior to the implementation of the RRT and 1361 after implementation. There was a tendency toward decreased readmission rates one year after RRT implementation. The APACHE II score and SOFA score at ICU discharge were independent factors associated to readmission, as well as clinical referral to the ICU. The RRT intervention resulted in a sustained decrease in readmission rates one year after implementation of this service. The use of a specialized team in health institutions can be recommended for ICU survivors. Copyright © 2016 Elsevier España, S.L.U. y SEMICYUC. All rights reserved.

  10. Successful Issues for Implementing Enterprise Resource Planning (ERP)

    Institute of Scientific and Technical Information of China (English)

    LI Bing-guang; Michael W. Riley

    2003-01-01

    Enterprise Resource Planning (ERP) systems have emerged and have matured to become the core of successful information management and the enterprise backbone of organizations for applications such as e-business, Supply Chain Management (SCM) and Customer Relation Management (CRM). This paper theorizes and generalizes the important steps and factors for ERP implementation success. First, the paper gives an introduction to ERP and the relationships between MRP, MPRII and ERP. The benefits and motivations of adoption of ERP systems are introduced. Steps for ERP system selection and implementation are presented. The paper proposes a qualitative analysis of the key factors that affect a successful ERP implementation.

  11. Connecting the Dots--From Planning to Implementation: Translating Commitments into Action in a Strategic Planning Process

    Science.gov (United States)

    Mieso, Rob Roba

    2010-01-01

    This study examines the implementation of the Commitments to Action (CTAs) that were developed for the Outreach Institutional Initiative (OII) as part of the 2006 strategic planning process at De Anza College. Although the strategic planning process identified four Institutional Initiatives (IIs) [Outreach, Individualized Attention to Student…

  12. Planning successful change incorporating processes and people.

    Science.gov (United States)

    Hewitt-Taylor, Jaqui

    Implementing change is a core element of developing healthcare practice. While planning the practical aspects of change is vital, so too is considering how people will perceive and be affected by an innovation, including what individuals and teams will gain or lose, who the opinion leaders will be and the influence of workplace culture. The aim of this article is to highlight some of the considerations that may be useful in planning successful change.

  13. Putting the MeaT into TeaM Training: Development, Delivery, and Evaluation of a Surgical Team-Training Workshop.

    Science.gov (United States)

    Seymour, Neal E; Paige, John T; Arora, Sonal; Fernandez, Gladys L; Aggarwal, Rajesh; Tsuda, Shawn T; Powers, Kinga A; Langlois, Gerard; Stefanidis, Dimitrios

    2016-01-01

    Despite importance to patient care, team training is infrequently used in surgical education. To address this, a workshop was developed by the Association for Surgical Education Simulation Committee to teach team training using high-fidelity patient simulators and the American College of Surgeons-Association of Program Directors in Surgery team-training curriculum. Workshops were conducted at 3 national meetings. Participants completed preworkshop and postworkshop questionnaires to define experience, confidence in using simulation, intention to implement, as well as workshop content quality. The course consisted of (A) a didactic review of Preparation, Implementation, and Debriefing and (B) facilitated small group simulation sessions followed by debriefings. Of 78 participants, 51 completed the workshops. Overall, 65% indicated that residents at their institutions used patient simulation, but only 33% used the American College of Surgeons-the Association of Program Directors in Surgery team-training modules. The workshop increased confidence to implement simulation team training (3.4 ± 1.3 vs 4.5 ± 0.9). Quality and importance were rated highly (5.4 ± 00.6, highest score = 6). Preparation for simulation-based team training is possible in this workshop setting, although the effect on actual implementation remains to be determined. Copyright © 2015 Association of Program Directors in Surgery. Published by Elsevier Inc. All rights reserved.

  14. An evaluation of Mexican transportation planning, finance, implementation, and construction processes.

    Science.gov (United States)

    2009-10-01

    This research examined the legal, financial, institutional and policy processes that Mexico uses to plan, finance, : construct, and implement its transportation network. It documents through twelve case studies the state of the : practice in planning...

  15. Assessing the implementation of the family care team in the district health system of health region 2, Thailand

    Directory of Open Access Journals (Sweden)

    Nithra Kitreerawutiwong

    2018-02-01

    Full Text Available Background: The family care team (FCT was established to improve the quality of care. This study aimed to explore the perceptions of FCT implementation and describe the challenges inherent in implementing the FCT. Methods: Forty in-depth interviews were conducted. The interviewees consisted of five primary care managers in the provincial medical health office, five directors of community hospitals, five administrators in district health offices, ten subdistrict health-promoting hospital directors, representatives from ten local organizations, and five heads of village health volunteers. Data were collected in accordance with semistructured interview guidelines and analyzed by thematic analysis. Results: Participants’ expressed their opinions through five themes: (1 the role and scope of practice, (2 the communication in collaboration of the FCT, (3 the management of the FCT, (4 the impact of the FCT on the team members’ feelings and primary care performance, and (5 the main challenges, including the insufficiency of a teamwork culture and a biomedical approach. Conclusion: The information suggests the importance of issues such as the clarification of the team members’ roles and managers’ roles, communication within and across FCTs, and the preparation for training of interprofessionals to enhance collaborative management to achieve the optimal care for people in the district health system.

  16. 78 FR 18936 - Revision to the California State Implementation Plan, South Coast Air Quality Management Plan

    Science.gov (United States)

    2013-03-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0920; FRL-9779-1] Revision to the California State Implementation Plan, South Coast Air Quality Management Plan AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule. SUMMARY: EPA is proposing to approve a revision to the South...

  17. An overview of the IAEA action team activities in Iraq

    Energy Technology Data Exchange (ETDEWEB)

    Dillon, G.; Baute, J. [International Atomic Energy Agency IAEA, Vienna (Austria)

    2001-07-01

    Following Iraq withdrawal from Kuwait, the United Nations Security Council adopted its resolution 687 (1991), setting out the terms of the cease fire agreement. Those terms, inter alia, requested the Director General of the International Atomic Energy Agency (IAEA) to carry out immediate on-site inspection of Iraq nuclear capabilities, to prepare and carry out a plan for the destruction, removal and rendering harmless of all assets relevant to the design and production of nuclear weapons, and to design and eventually implement a plan for the ongoing monitoring and verification of Iraq compliance with its related obligations under Security Council resolutions. This paper summarises the work of the IAEA Iraq Action Team, established by the Director General to carry out the practical tasks necessary to implement the requests of the Security Council. It also highlights the lessons learned from a unique regime of disarmament and verification. (author)

  18. An overview of the IAEA action team activities in Iraq

    International Nuclear Information System (INIS)

    Dillon, G.; Baute, J.

    2001-01-01

    Following Iraq withdrawal from Kuwait, the United Nations Security Council adopted its resolution 687 (1991), setting out the terms of the cease fire agreement. Those terms, inter alia, requested the Director General of the International Atomic Energy Agency (IAEA) to carry out immediate on-site inspection of Iraq nuclear capabilities, to prepare and carry out a plan for the destruction, removal and rendering harmless of all assets relevant to the design and production of nuclear weapons, and to design and eventually implement a plan for the ongoing monitoring and verification of Iraq compliance with its related obligations under Security Council resolutions. This paper summarises the work of the IAEA Iraq Action Team, established by the Director General to carry out the practical tasks necessary to implement the requests of the Security Council. It also highlights the lessons learned from a unique regime of disarmament and verification. (author)

  19. Using iKidTools™ Software Support Systems to Develop and Implement Self-Monitoring Interventions

    Science.gov (United States)

    Patti, Angela L.; Miller, Kevin J.

    2011-01-01

    Educational teams often are faced with the task of developing and implementing Behavioral Intervention Plans (BIPs) for students who present challenging and/or disruptive behaviors. This article describes the steps used to develop and implement a self-monitoring BIP that incorporated an innovative software system, iKidTools™. An authentic case…

  20. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    International Nuclear Information System (INIS)

    Tian, Zhen; Folkerts, Michael; Tan, Jun; Jia, Xun; Jiang, Steve B.; Peng, Fei

    2015-01-01

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques

  1. Multi-GPU implementation of a VMAT treatment plan optimization algorithm

    Energy Technology Data Exchange (ETDEWEB)

    Tian, Zhen, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Folkerts, Michael; Tan, Jun; Jia, Xun, E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu; Jiang, Steve B., E-mail: Zhen.Tian@UTSouthwestern.edu, E-mail: Xun.Jia@UTSouthwestern.edu, E-mail: Steve.Jiang@UTSouthwestern.edu [Department of Radiation Oncology, University of Texas Southwestern Medical Center, Dallas, Texas 75390 (United States); Peng, Fei [Computer Science Department, Carnegie Mellon University, Pittsburgh, Pennsylvania 15213 (United States)

    2015-06-15

    then used to validate the authors’ method. The authors also compare their multi-GPU implementation with three different single GPU implementation strategies, i.e., truncating DDC matrix (S1), repeatedly transferring DDC matrix between CPU and GPU (S2), and porting computations involving DDC matrix to CPU (S3), in terms of both plan quality and computational efficiency. Two more H and N patient cases and three prostate cases are used to demonstrate the advantages of the authors’ method. Results: The authors’ multi-GPU implementation can finish the optimization process within ∼1 min for the H and N patient case. S1 leads to an inferior plan quality although its total time was 10 s shorter than the multi-GPU implementation due to the reduced matrix size. S2 and S3 yield the same plan quality as the multi-GPU implementation but take ∼4 and ∼6 min, respectively. High computational efficiency was consistently achieved for the other five patient cases tested, with VMAT plans of clinically acceptable quality obtained within 23–46 s. Conversely, to obtain clinically comparable or acceptable plans for all six of these VMAT cases that the authors have tested in this paper, the optimization time needed in a commercial TPS system on CPU was found to be in an order of several minutes. Conclusions: The results demonstrate that the multi-GPU implementation of the authors’ column-generation-based VMAT optimization can handle the large-scale VMAT optimization problem efficiently without sacrificing plan quality. The authors’ study may serve as an example to shed some light on other large-scale medical physics problems that require multi-GPU techniques.

  2. Candidate functions for advanced technology implementation in the Columbus mission planning environment

    Science.gov (United States)

    Loomis, Audrey; Kellner, Albrecht

    1988-01-01

    The Columbus Project is the European Space Agency's contribution to the International Space Station program. Columbus is planned to consist of three elements (a laboratory module attached to the Space Station base, a man-tended freeflyer orbiting with the Space Station base, and a platform in polar orbit). System definition and requirements analysis for Columbus are underway, scheduled for completion in mid-1990. An overview of the Columbus mission planning environment and operations concept as currently defined is given, and some of the challenges presented to software maintainers and ground segment personnel during mission operators are identified. The use of advanced technologies in system implementation is being explored. Both advantages of such solutions and potential problems they present are discussed, and the next steps to be taken by Columbus before targeting any functions for advanced technology implementation are summarized. Several functions in the mission planning process were identified as candidates for advanced technology implementation. These range from expert interaction with Columbus' data bases through activity scheduling and near-real-time response to departures from the planned timeline. Each function is described, and its potential for advanced technology implementation briefly assessed.

  3. [Acceptance of the Implementation of Standardised Patient Education Programmes by the Multidisciplinary Rehabilitation Team Using the Example of a Back School - A Qualitative Study].

    Science.gov (United States)

    Peters, S; Schultze, A; Pfeifer, K; Faller, H; Meng, K

    2016-03-01

    The transfer of standardised patient education programmes into practice is a complex process with a multitude of influencing factors. Determinants relate among others to the organisation and individuals (e. g., practitioner, patient). Knowledge about individual factors regarding the trainers of patient education programmes in the German rehabilitation system is scarce. The aim of this study is to explore the acceptance of trainers concerning the implementation of a standardised back school and to derive facilitators and barriers to the implementation of patient education programmes. Semi-structured guideline-based interviews were conducted in 10 rehabilitation clinics. The sample consisted of 46 trainers (25 women): 11 physicians, 11 psychologists, 21 physio-/exercise therapists and 3 occupational therapists with a mean age of 41. The opinions of the trainers regarding the central components of back schools in general, their opinions about the new curriculum, their expectations on its implementation, anticipated difficulties with implementation and requests to the project team were explored as indicators for acceptance. The data were analysed with a multi-step qualitative content analysis. 6 main categories comprising 136 subcategories were created and 729 quotations coded. Regarding the central components that should be covered by back schools, back-friendly behaviour was addressed most often. Opinions regarding the new curriculum were mostly positive. Trainers' approval of content and methods was highlighted and the similarity with existing offers in the clinics as well as the structure of the programme were rated positively. The trainers expected an increased patient orientation and personal development as well as a common, coherent language and interdisciplinarity. Difficulties were anticipated regarding time and personnel as well as therapy and appointment planning and also regarding the motivation/acceptance of patients. A wish for communication, education

  4. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  5. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480.7A. Additionally, one observation was provided. To date, four of the recommendations and the one observation have been completed. Actions identified for seven of the recommendations are currently in progress. Exemption requests will be transmitted to DOE-RL for three of the recommendations. Six of the recommendations are related to future shut down activities of the facility and the corrective actions are not being addressed as part of this plan. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process. Major Life Safety Code concerns have been corrected. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. BVMC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  6. 77 FR 24399 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... approve the ozone 2002 base year emissions inventory, portion of the state implementation plan (SIP... technology (RACT), contingency measures, a 2002 base- year emissions inventory and other planning SIP...

  7. Strategic Planning for Hot Cell Closure

    International Nuclear Information System (INIS)

    LANGSTAFF, D.C.

    2001-01-01

    The United States Department of Energy (DOE) and its contractor were remediating a large hot cell complex to mitigate the radiological hazard. A Resource Conservation and Recovery Act (RCRA) closure unit was determined to be located within the complex. The regulator established a challenge to develop an acceptable closure plan on a short schedule (four months). The scope of the plan was to remove all excess equipment and mixed waste from the closure unit, establish the requirements of the legally binding Closure Plan and develop an acceptable schedule. The complex has several highly radioactive tanks, tank vaults, piping, and large hot cells containing complex chemical processing equipment. Driven by a strong need to develop an effective strategy to meet cleanup commitments, three principles were followed to develop an acceptable plan: (1) Use a team approach, (2) Establish a buffer zone to support closure, and (3) Use good practice when planning the work sequence. The team was composed of DOE, contractor, and Washington State Department of Ecology (Regulator) staff. The team approach utilized member expertise and fostered member involvement and communication. The buffer zone established an area between the unregulated parts of the building and the areas that were allegedly not in compliance with environmental standards. Introduction of the buffer zone provided simplicity, clarity, and flexibility into the process. Using good practice means using the DOE Integrated Safety Management Core Functions for planning and implementing work safely. Paying adequate attention to detail when the situation required contributed to the process credibility and a successful plan

  8. The impact of brief team communication, leadership and team behavior training on ad hoc team performance in trauma care settings.

    Science.gov (United States)

    Roberts, Nicole K; Williams, Reed G; Schwind, Cathy J; Sutyak, John A; McDowell, Christopher; Griffen, David; Wall, Jarrod; Sanfey, Hilary; Chestnut, Audra; Meier, Andreas H; Wohltmann, Christopher; Clark, Ted R; Wetter, Nathan

    2014-02-01

    Communication breakdowns and care coordination problems often cause preventable adverse patient care events, which can be especially acute in the trauma setting, in which ad hoc teams have little time for advanced planning. Existing teamwork curricula do not address the particular issues associated with ad hoc emergency teams providing trauma care. Ad hoc trauma teams completed a preinstruction simulated trauma encounter and were provided with instruction on appropriate team behaviors and team communication. Teams completed a postinstruction simulated trauma encounter immediately afterward and 3 weeks later, then completed a questionnaire. Blinded raters rated videotapes of the simulations. Participants expressed high levels of satisfaction and intent to change practice after the intervention. Participants changed teamwork and communication behavior on the posttest, and changes were sustained after a 3-week interval, though there was some loss of retention. Brief training exercises can change teamwork and communication behaviors on ad hoc trauma teams. Copyright © 2014 Elsevier Inc. All rights reserved.

  9. The innovative rehabilitation team: an experiment in team building.

    Science.gov (United States)

    Halstead, L S; Rintala, D H; Kanellos, M; Griffin, B; Higgins, L; Rheinecker, S; Whiteside, W; Healy, J E

    1986-06-01

    This article describes an effort by one rehabilitation team to create innovative approaches to team care in a medical rehabilitation hospital. The major arena for implementing change was the weekly patient rounds. We worked to increase patient involvement, developed a rounds coordinator role, used a structured format, and tried to integrate research findings into team decision making. Other innovations included use of a preadmission questionnaire, a discharge check list, and a rounds evaluation questionnaire. The impact of these changes was evaluated using the Group Environment Scale and by analyzing participation in rounds based on verbatim transcripts obtained prior to and 20 months after formation of the Innovative Rehabilitation Team (IRT). The results showed decreased participation by medical personnel during rounds, and increased participation by patients. The rounds coordinator role increased participation rates of staff from all disciplines and the group environment improved within the IRT. These data are compared with similar evaluations made of two other groups, which served as control teams. The problems inherent in making effective, lasting changes in interdisciplinary rehabilitation teams are reviewed, and a plea is made for other teams to explore additional ways to use the collective creativity and resources latent in the team membership.

  10. MRP II (material requirements planning): one year later.

    Science.gov (United States)

    Tull, W L; Norman, R L

    1994-08-01

    This article addresses the continued need for the behavior change process that must be managed long after materiel requirements planning (MRP II) implementation. Mason & Hanger, Pantex Plant is the final assembly and dismantlement facility for all United States nuclear weapons. On October 1, 1990, Mason & Hanger implemented a full production cutover to MRP II. One year later, following class A certification, the MRP II implementation team is still actively managing the change process through education and training programs and overall continuous improvement initiatives. Actual behavior change problems are identified together with the proven solutions implemented in a government-owned, contractor-operated facility environment. Performance measurements ranging from senior management planning to shop floor accomplishments and cost variance reports are shown as normal management tools used to identify target improvement areas.

  11. Assessing and implementing training requirements for staff at plants to meet safety, environment and job needs

    Energy Technology Data Exchange (ETDEWEB)

    Lagasse, L. (Manitoba Hydro, Winnipeg, MB (Canada))

    1999-01-01

    The rationale for and the process to establish a team to develop a framework for a training plan, determine the cost of such a program for all employees of the Power Supply Division of Manitoba Hydro, and to establish guidelines for implementation of the plan are described. The end result of the process is a job profile and skill and knowledge inventory for some 25 job families within the Power Supply Division; a form to establish training needs for all employees for a three year period which will provide the basis for a three-year training plan and budget; an implementation guide and training plan spreadsheet to facilitate the implementation process; and a series of performance indicators. 4 figs.

  12. IAEA Operational Safety Team (OSART) Reviews Progress at Fessenheim Nuclear Power Plant, France

    International Nuclear Information System (INIS)

    2011-01-01

    Full text: An international team of nuclear installation safety experts, led by the International Atomic Energy Agency (IAEA), has evaluated the French Nuclear Power Plant (NPP) at Fessenheim to assess how the facility has followed up on an Operational Safety Review Team (OSART) mission undertaken in 2009. The IAEA assembled a team of experts at the request of the Government of France to conduct the mission. Follow-up missions are standard components of the OSART programme and are conducted 18-24 months after the initial OSART mission. Under the leadership of the IAEA's Division of Nuclear Installation Safety, the team performed its review from 7 to 11 February 2011. The team assessed how the Fessenheim NPP has addressed the recommendations and suggestions made during the 2009 OSART mission. The team was made up of experts from Slovakia, Switzerland and the IAEA. The review covered the areas of Management, Organization and Administration; Training and Qualifications; Operations; Maintenance; Technical Support; Operating Experience; Radiation Protection; Chemistry and Emergency Planning and Preparedness. The conclusions of the follow-up review are based on the IAEA's Safety Standards and proven good international practices. There were 21 issues raised by the 2009 mission. During the follow-up mission, the team assessed that six issues had been resolved, thirteen had made satisfactory progress to date and two had made insufficient progress to date. 'Resolved' describes action plans for improvement that have been fully implemented; 'satisfactory progress to date' describes action plans that have been developed but are not yet fully implemented; and 'insufficient progress to date' describes situations where additional consideration or strengthening of improvement plans is necessary. Examples of issues falling into different resolution categories include: The plant has resolved the suggestion to establish a process to review initial training materials on a regular basis

  13. The emergency plan implementing procedures for HANARO facility

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jong Tai; Khang, Byung Oui; Lee, Goan Yup; Lee, Moon [Korea Atomic Energy Research Institute, Taejon (Korea)

    1999-04-01

    The radiological emergency plan implementing procedures of HANARO (High-flux Advanced Neutron Application Reactor) facility is prepared based on the Korea Atomic Law, the Civil Defence Law, Disaster Protection Law and the emergency related regulatory guides such as Guidance for Evolution of Radiation Emergency Plans in Nuclear Research Facilities (KAERI/TR-956/98, Feb.1998) and the emergency plan of HANARO. These procedures is also prepared to ensure adequate response activities to the rediological events which would cause a significant risk to the KAERI staffs and the public nea to the site. Periodic trainning and exercise for the reactor operators and emergency staffs will reduce accident risks and the release of radioactivities to the environment. 61 refs., 81 tabs. (Author)

  14. 76 FR 68381 - Approval and Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean...

    Science.gov (United States)

    2011-11-04

    ... Promulgation of Air Quality Implementation Plans; Pennsylvania; Pennsylvania Clean Vehicles Program AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Pennsylvania. This SIP revision contains Pennsylvania's Clean Vehicle Program, which adopts California's second generation low emission vehicle program...

  15. The International Space Life Sciences Strategic Planning Working Group

    Science.gov (United States)

    White, Ronald J.; Rabin, Robert; Lujan, Barbara F.

    1993-01-01

    Throughout the 1980s, ESA and the space agencies of Canada, Germany, France, Japan, and the U.S. have pursued cooperative projects bilaterally and multilaterally to prepare for, and to respond to, opportunities in space life sciences research previously unapproachable in scale and sophistication. To cope effectively with likely future space research opportunities, broad, multilateral, coordinated strategic planning is required. Thus, life scientists from these agencies have allied to form the International Space Life Sciences Strategic Planning Working Group. This Group is formally organized under a charter that specifies the purpose of the Working Group as the development of an international strategic plan for the space life sciences, with periodic revisions as needed to keep the plan current. The plan will be policy-, not operations-oriented. The Working Group also may establish specific implementation teams to coordinate multilateral science policy in specific areas; such teams have been established for space station utilization, and for sharing of flight equipment.

  16. Managing Plan Implementation in the Asante Akyem South District ...

    African Journals Online (AJOL)

    Managing Plan Implementation in the Asante Akyem South District Assembly: Capacity Issues and Challenges. ... This paper uses a case study approach to appraise the capacity of the Asante Akyem South District Assembly (AASDA) in ...

  17. Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan

    Science.gov (United States)

    Allen Solomon; Richard A. Birdsey; Linda A. Joyce

    2010-01-01

    In keeping with the research goals of the U.S. Global Change Research Program, the climate change strategy of the U.S. Department of Agriculture (USDA), and the climate change framework of the Forest Service, this Forest Service Global Change Research Strategy, 2009-2019 Implementation Plan (hereafter called the Research Plan), was written by Forest Service Research...

  18. Facilitating food-related planning : Applying metacognition, cue-monitoring, and implementation intentions

    NARCIS (Netherlands)

    Verhoeven, A.A.C.

    2015-01-01

    Implementation intentions are specific if-then plans that can successfully change unwanted habits by linking the critical cue triggering the unwanted behavior to a healthier alternative. For example, in order to consume fewer unhealthy snacks while watching television, a plan could be formulated

  19. Building a Team of Teachers for Designing and Implementation of Modul Educational Programs

    Directory of Open Access Journals (Sweden)

    Kashtanova S.N.

    2015-11-01

    Full Text Available This article can be classified as thematic review, since it shows the actual experience of a human resources choice for the design and implementation of modular educational programs. It illustrates the main issues and initiative solutions to the team strategies modeling in a modernization of pedagogical education in Russia. We presents the basic ideological orientations of the modern university teacher from the point of view of reflective pedagogy and pedagogical management. We analyzed the experience of studying the teachers’ readiness to innovative activity and gave examples of dealing with the expectations and needs of potential employers and consumers of educational products using the foresight studies. A model of a graduate and the role of the teacher were analyzed based on expert panels method. Functional mechanisms, and technical aspects of teacher performance, designing and implementing modular educational programs were described with the projection of properties and qualities of the educational product on the professional and personal characteristics of the teacher.

  20. Does adding a dietician to the liaison team after discharge of geriatric patients improve nutritional outcome

    DEFF Research Database (Denmark)

    Beck, Anne Marie; Tolstrup Andersen, Ulla; Leedo, Eva

    2015-01-01

    (70 + years and at nutritional risk) at discharge. INTERVENTIONS: Participants were randomly allocated to receive discharge Liaison-Team vs. discharge Liaison-Team in cooperation with a dietician. The dietician performed a total of three home visits with the aim of developing and implementing......OBJECTIVES: The objective was to test whether adding a dietician to a discharge Liaison-Team after discharge of geriatric patients improves nutritional status, muscle strength and patient relevant outcomes. DESIGN: Twelve-week randomized controlled trial. SETTING AND SUBJECTS: Geriatric patients...... an individual nutritional care plan. The first visit took place at the day of discharge together with the discharge Liaison-Team while the remaining visits took place approximately three and eight weeks after discharge and were performed by a dietician alone. MAIN MEASURES: Nutritional status (weight...

  1. Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan for fiscal year 1992

    International Nuclear Information System (INIS)

    1991-09-01

    The Columbia River Basin Fish and Wildlife Program Annual Implementation Work Plan (AIWP) for Fiscal Year (FY) 1992 presents Bonneville Power Administration's (BPA) plans for implementing the Columbia River Basin Fish and Wildlife Program (Program) in FY 1992. The AIWP focuses on individual Action Items found in the 1987 Program for which BPA has determined that it has authority and responsibility to implement. Each of the entries in the AIWP includes objectives, background, progress to date in achieving the objectives, and a summary of plans for implementation in FY 1992. Most Action Items are implemented through one or more BPA-funded projects. Each Action Item entry is followed by a list of completed, ongoing, and planned projects, along with objectives, results, schedules, and milestones for each project. In October 1988, BPA and the Columbia Basin Fish and Wildlife Authority (CBFWA) initiated a collaborative and cooperative Implementation Planning Process (IPP). The IPP provided opportunities in FY 1991 for the fish and wildlife agencies. Tribes, and other interested parties to be involved in planning FY 1992 Program implementation. This planing process contributed to the development of this year's AIWP. The joint BPA/CBFWA IPP is expected to continue in FY 1992. The FY 1992 AIWP emphasizes continuation of 143 ongoing, or projected ongoing Program projects, tasks, or task orders, most of which involve protection, mitigation, or enhancement of anadromous fishery resources. The FY 1992 AIWP also contains 10 new Program projects or tasks that are planned to start in FY 1992

  2. The Benefits of Team Teaching.

    Science.gov (United States)

    Morganti, Deena J.; Buckalew, Flora C.

    1991-01-01

    Discussion of team teaching focuses on librarians team teaching a course on information search strategy at the Pennsylvania State Berks Campus Library. Course requirements are described, planning for the course is discussed, grading practices are reviewed, and course and instructor evaluations are described. (two references) (LRW)

  3. [Team Care for Patient Safety, TeamSTEPPS to Improve Nontechnical Skills and Teamwork--Actions to Become an HRO].

    Science.gov (United States)

    Kaito, Ken

    2015-07-01

    It is important to develop safer medical systems and follow manuals of medical procedures for patient safety. However, these approaches do not always result in satisfactory results because of many human factors. It is known that defects of nontechnical skills are more important than those of technical skills regarding medical accidents and incidents. So, it is necessary to improve personal nontechnical skills and compensate for each other's defects based on a team approach. For such purposes, we have implemented TeamSTEPPS to enhance performance and patient safety in our hospital. TeamSTEPPS (team strategies and tools to enhance performance and patient safety) is a useful method to improve the nontechnical skills of each member and the team. In TeamSTEPPS, leadership to share mental models among the team, continuous monitoring and awareness for team activities, mutual support for workload and knowledge, and approaches to complete communication are summarized to enhance teamwork and patient safety. Other than improving nontechnical skills and teamwork, TeamSTEPPS is also very important as a High Reliability Organization (HRO). TeamSTEPPS is worth implementing in every hospital to decrease medical errors and improve patient outcomes and satisfaction.

  4. 78 FR 889 - Finding of Substantial Inadequacy of Implementation Plan; Call for California State...

    Science.gov (United States)

    2013-01-07

    ... Resources Defense Council; and Physicians for Social Responsibility--Los Angeles, (``environmental and... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0721; FRL-9767-3] Finding of Substantial Inadequacy of Implementation Plan; Call for California State Implementation Plan Revision; South...

  5. 75 FR 20922 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Transportation...

    Science.gov (United States)

    2010-04-22

    ... with the January 2009, ``Guidance for Developing Transportation Conformity State Implementation Plans... Promulgation of Air Quality Implementation Plans; New Mexico; Transportation Conformity Requirement for... Transportation Conformity? II. What Is the Background for This Action? III. What Did the State Submit and How Did...

  6. 77 FR 45326 - Approval, Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional...

    Science.gov (United States)

    2012-07-31

    ... available in either location (e.g., Confidential Business Information). To inspect the hard copy materials..., Disapproval and Promulgation of Air Quality Implementation Plans; Arizona; Regional Haze State and Federal Implementation Plans AGENCY: Environmental Protection Agency (EPA). ACTION: Proposed rule; notice of additional...

  7. Actor coalitions and implementation in strategic delta planning: Opening the Haringvliet sluices in the Netherlands

    Science.gov (United States)

    Vermoolen, Myrthe; Hermans, Leon

    2016-04-01

    The sustained development of urbanizing deltas is influenced by natural and societal processes. These processes are characterized by their long time span, in which conflicting interests of different stakeholders have to be reconciled. Reaching consent between actors is a challenge itself, but maintaining this consent throughout different stages of strategic planning - from advocacy and agenda setting to implementation - over these long periods of time is even more difficult. The implementation stage still includes many different actors involved, some of which are different than the ones who agreed before, due to both the long run of the strategic delta planning, and to a shift of tasks and responsibilities. Thus, implementation of strategic plans often features delays, deviations of agreed plans and unintended outcomes. A key question therefore is how coalition dynamics in (pre-)planning stages influence and are influenced by the coalition dynamics during implementation. The different stages in strategic planning are often studied from either a plan formulation or an implementation perspective, but the connection between the two proves an important bottleneck for strategic planning in deltas. For instance, many building with nature solutions are still in their pilot-phase, and their upscaling can profit from lessons concerning past implementation efforts. The proposed contribution will use the case of the management of the Dutch Haringvliet sluices and the decision ('Kierbesluit') in 2000 to put these sluices ajar, to study the link between the different strategic delta planning stages and the role of the formation and change of actor coalitions herein. With the completion of the Haringvliet dam with outlet sluices in 1970, the Haringvliet estuary of the rivers Rhine and Meuse was closed off from the sea, creating a fresh water lake. This was done to make the Dutch Southwest delta safe from flooding, and had positive effects for agricultural water supply and

  8. Performance of district disaster management teams after undergoing an operational level planners' training in Uganda.

    Science.gov (United States)

    Orach, Christopher Garimol; Mayega, Roy William; Woboya, Vincent; William, Bazeyo

    2013-06-01

    Uganda is vulnerable to several natural, man-made and a hybrid of disasters including drought, famine, floods, warfare, and disease outbreaks. We assessed the district disaster team's performance, roles and experiences following the training. The disasters most commonly experienced by the district teams were epidemics of diseases in humans (7 of 12), animals (epizoonotics) (3 of 12) and crops (3 of 12); hailstorms and floods (3 of 12). The capabilities viewed most useful for management of disasters were provision of health care services (9/12) and response management (8 of 12). The capability domains most often consulted during the disasters were general response management (31%), health services (29%) and water and sanitation (17%). The skills areas perceived to be vital following the training were response to epidemics 10/12, disaster management planning 8/12, hazards and vulnerability analysis 7/12 and principles of disaster planning 7/12 respectively. Main challenges mentioned by district teams were inadequacy of finance and logistics, lack of commitment by key partners towards disaster preparedness and response. The most common disaster experienced disasters related to outbreaks of diseases in man, animals and crops. The most frequently applied capabilities were response management and provision of emergency health services. The activities most frequently implemented following disaster management teams training were conducting planning meetings, refinement of plans and dissemination of skills gained. The main challenges were related to limited budget allocations and legal frameworks for disaster management that should be addressed by both central and local governments.

  9. Sustainability of cross-functional teams for marketing strategy development and implementation.

    Science.gov (United States)

    Kono, Ken; Antonucci, Don

    2006-01-01

    This article presents a case study on a cross-functional team used for marketing strategy development and execution at a health insurance company. The study found a set of success factors that contributed to the initial success of the team, but the factors were not enough to maintain the team's high level of productivity over time. The study later identified a set of 8 factors that helped sustain the team's high-productivity level. The 2 sets (ie, success and its subsequent sustainability factors) are analyzed against a normative model of team effectiveness. All the factors are explained by the normative model except for 1 sustainability factor, "challenge motivator." In fact, the study found the "challenge motivator" to be the most critical factor to keep up the team's productivity over time. Apart from a performance crisis, the authors developed 3 "challenge motivators"--first, more granular market information that could unearth hidden performance issues; second, constant value creation to shareholders as the firm being publicly traded; and third, the firm's strategic mandate to meet and exceed customer expectations that puts ultimate performance pressure on the marketing strategy team.

  10. Standard Review Plan Maintenance Program implementing procedures document

    International Nuclear Information System (INIS)

    1996-11-01

    The implementing Procedures Document (IPD) was developed by the Inspection Program Projects Branch, Office of Nuclear Reactor Regulation, with assistance from Pacific Northwest National Laboratory, for the Standard Review Plan Maintenance Program (SRP-MP). The SRP-MP was established to maintain the Standard Review Plan (SRP) on an on-going basis. The IPD provides guidance, including an overall approach and procedures, for SRP-MP tasks. The objective of the IPD is to ensure that modifications to SRP need to reflect current NRC requirements and guidance are identified and that a consistent methodology is used to develop and revise SRP sections

  11. 76 FR 49313 - Approval and Promulgation of Implementation Plans North Carolina: Prevention of Significant...

    Science.gov (United States)

    2011-08-10

    ... Code (NCAC), Subchapter 2D .0530, subsections (a), (b), (g), (i), (u), and (v) (from North Carolina's... and Promulgation of Implementation Plans North Carolina: Prevention of Significant Deterioration and...: EPA is taking final action to approve revisions to the North Carolina State Implementation Plan (SIP...

  12. The effects of team reflexivity on psychological well-being in manufacturing teams.

    Science.gov (United States)

    Chen, Jingqiu; Bamberger, Peter A; Song, Yifan; Vashdi, Dana R

    2018-04-01

    While the impact of team reflexivity (a.k.a. after-event-reviews, team debriefs) on team performance has been widely examined, we know little about its implications on other team outcomes such as member well-being. Drawing from prior team reflexivity research, we propose that reflexivity-related team processes reduce demands, and enhance control and support. Given the centrality of these factors to work-based strain, we posit that team reflexivity, by affecting these factors, may have beneficial implications on 3 core dimensions of employee burnout, namely exhaustion, cynicism, and inefficacy (reduced personal accomplishment). Using a sample of 469 unskilled manufacturing workers employed in 73 production teams in a Southern Chinese factory, we implemented a time lagged, quasi-field experiment, with half of the teams trained in and executing an end-of-shift team debriefing, and the other half assigned to a control condition and undergoing periodic postshift team-building exercises. Our findings largely supported our hypotheses, demonstrating that relative to team members assigned to the control condition, those assigned to the reflexivity condition experienced a significant improvement in all 3 burnout dimensions over time. These effects were mediated by control and support (but not demands) and amplified as a function of team longevity. (PsycINFO Database Record (c) 2018 APA, all rights reserved).

  13. Training van crisismanagement-teams [Training of emergency management teams

    NARCIS (Netherlands)

    Berlo, M.P.W. van; Stroomer, S.; Bosch, K. van den

    2003-01-01

    Een rampenplan of bedrijfsnoodplan bestaat veelal slechts uit een lijst met telefoonnummers, of het is een plan dat niet is geactualiseerd. Bovendien is het trainen van crisismanagement-teams lastig omdat crises vaak een onvoorspelbaar karakter hebben. in deze bijdrage worden twee methoden

  14. A novel implementation of mARC treatment for non-dedicated planning systems using converted IMRT plans

    International Nuclear Information System (INIS)

    Dzierma, Yvonne; Nuesken, Frank; Licht, Norbert; Ruebe, Christian

    2013-01-01

    The modulated arc (mARC) technique has recently been introduced by Siemens as an analogue to VMAT treatment. However, up to now only one certified treatment planning system supports mARC planning. We therefore present a conversion algorithm capable of converting IMRT plans created by any treatment planning system into mARC plans, with the hope of expanding the availability of mARC to a larger range of clinical users and researchers. As additional advantages, our implementation offers improved functionality for planning hybrid arcs and provides an equivalent step-and-shoot plan for each mARC plan, which can be used as a back-up concept in institutions where only one linac is equipped with mARC. We present a feasibility study to outline a practical implementation of mARC plan conversion using Philips Pinnacle and Prowess Panther. We present examples for three different kinds of prostate and head-and-neck plans, for 6 MV and flattening-filter-free (FFF) 7 MV photon energies, which are dosimetrically verified. It is generally more difficult to create good quality IMRT plans in Pinnacle using a large number of beams and few segments. We present different ways of optimization as examples. By careful choosing the beam and segment arrangement and inversion objectives, we achieve plan qualities similar to our usual IMRT plans. The conversion of the plans to mARC format yields functional plans, which can be irradiated without incidences. Absolute dosimetric verification of both the step-and-shoot and mARC plans by point dose measurements showed deviations below 5% local dose, mARC plans deviated from step-and-shoot plans by no more than 1%. The agreement between GafChromic film measurements of planar dose before and after mARC conversion is excellent. The comparison of the 3D dose distribution measured by PTW Octavius 729 2D-Array with the step-and-shoot plans and with the TPS is well above the pass criteria of 90% of the points falling within 5% local dose and 3 mm distance

  15. Design and Implementation of Regional and Communal Energy Plans

    International Nuclear Information System (INIS)

    Jilek, W.

    1997-01-01

    Local energy planning has become a common thing, particularly after the first oil shock in the year 1973. This kind of planning claims to follow an integrated approach, i.e. to treat not only the economic problems connected with the supply of energy, but also the environmental problems concerned and the questions related to the conservation of resources. In Styria, such ''integrated'' plans have emerged in more than 25 municipalities, so far. Most of these concepts - harmonized with the clearly defined goals and objectives of the province's energy and environmental policy - may be termed a success insofar, as the measures considered therein are already in the process of practical implementation. (author)

  16. Task and Motion Planning for Selective Weed Conrol using a Team of Autonomous Vehicles

    DEFF Research Database (Denmark)

    Hameed, Ibrahim; la Cour-Harbo, Anders; Hansen, Karl Damkjær

    2014-01-01

    with the right amount. In this article, a task and motion planning for a team of autonomous vehicles to reduce chemicals in farming is presented. Field data are collected by small unmanned helicopters equipped with a range of sensors, including multispectral and thermal cameras. Data collected are transmitted...... to a ground station to be analyzed and triggers aerial and ground-based vehicles to start close inspection and/or plant/weed treatment in specified areas. A complete trajectory is generated to enable ground-based vehicle to visit infested areas and start chemical/mechanical weed treatment....

  17. Communicating with Pet Owners About Obesity: Roles of the Veterinary Health Care Team.

    Science.gov (United States)

    Churchill, Julie; Ward, Ernie

    2016-09-01

    Obesity continues to be the most prevalent nutritional problem of dogs and cats as well as one of the most frustrating conditions to treat successfully. Educating and assigning roles to all members of the health care team will improve staff engagement and the consistency and effectiveness of nutritional counseling for preventive care and weight loss treatment plans. Excellent communication skills can be used to assess the client's ability to change and implement a weight loss plan at the right time in the right way to achieve better adherence and improve patient health. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Implementation of an evolutionary algorithm in planning investment in a power distribution system

    Directory of Open Access Journals (Sweden)

    Carlos Andrés García Montoya

    2011-06-01

    Full Text Available The definition of an investment plan to implement in a distribution power system, is a task that constantly faced by utilities. This work presents a methodology for determining the investment plan for a distribution power system under a shortterm, using as a criterion for evaluating investment projects, associated costs and customers benefit from its implementation. Given the number of projects carried out annually on the system, the definition of an investment plan requires the use of computational tools to evaluate, a set of possibilities, the one that best suits the needs of the present system and better results. That is why in the job, implementing a multi objective evolutionary algorithm SPEA (Strength Pareto Evolutionary Algorithm, which, based on the principles of Pareto optimality, it deliver to the planning expert, the best solutions found in the optimization process. The performance of the algorithm is tested using a set of projects to determine the best among the possible plans. We analyze also the effect of operators on the performance of evolutionary algorithm and results.

  19. Conceptualizing Interprofessional Teams as Multi-Team Systems-Implications for Assessment and Training.

    Science.gov (United States)

    West, Courtney; Landry, Karen; Graham, Anna; Graham, Lori; Cianciolo, Anna T; Kalet, Adina; Rosen, Michael; Sherman, Deborah Witt

    2015-01-01

    SGEA 2015 CONFERENCE ABSTRACT (EDITED). Evaluating Interprofessional Teamwork During a Large-Scale Simulation. Courtney West, Karen Landry, Anna Graham, and Lori Graham. CONSTRUCT: This study investigated the multidimensional measurement of interprofessional (IPE) teamwork as part of large-scale simulation training. Healthcare team function has a direct impact on patient safety and quality of care. However, IPE team training has not been the norm. Recognizing the importance of developing team-based collaborative care, our College of Nursing implemented an IPE simulation activity called Disaster Day and invited other professions to participate. The exercise consists of two sessions: one in the morning and another in the afternoon. The disaster scenario is announced just prior to each session, which consists of team building, a 90-minute simulation, and debriefing. Approximately 300 Nursing, Medicine, Pharmacy, Emergency Medical Technicians, and Radiology students and over 500 standardized and volunteer patients participated in the Disaster Day event. To improve student learning outcomes, we created 3 competency-based instruments to evaluate collaborative practice in multidimensional fashion during this exercise. A 20-item IPE Team Observation Instrument designed to assess interprofessional team's attainment of Interprofessional Education Collaborative (IPEC) competencies was completed by 20 faculty and staff observing the Disaster Day simulation. One hundred sixty-six standardized patients completed a 10-item Standardized Patient IPE Team Evaluation Instrument developed from the IPEC competencies and adapted items from the 2014 Henry et al. PIVOT Questionnaire. This instrument assessed the standardized or volunteer patient's perception of the team's collaborative performance. A 29-item IPE Team's Perception of Collaborative Care Questionnaire, also created from the IPEC competencies and divided into 5 categories of Values/Ethics, Roles and Responsibilities

  20. Diversity Management in Global Teams

    DEFF Research Database (Denmark)

    Clausen, Lisbeth

    2016-01-01

    implemented in the local organization? How are organizational culture, vision and images aligned with the team processes to accomplish the task? Does professional (functional) expertise influence team collaboration and finally how do individual experiences and coping strategies matter? The US and Japan...

  1. Developing a national dissemination plan for collaborative care for depression: QUERI Series

    Directory of Open Access Journals (Sweden)

    Rubenstein Lisa V

    2008-12-01

    Full Text Available Abstract Background Little is known about effective strategies for disseminating and implementing complex clinical innovations across large healthcare systems. This paper describes processes undertaken and tools developed by the U.S. Department of Veterans Affairs (VA Mental Health Quality Enhancement Research Initiative (MH-QUERI to guide its efforts to partner with clinical leaders to prepare for national dissemination and implementation of collaborative care for depression. Methods An evidence-based quality improvement (EBQI process was used to develop an initial set of goals to prepare the VA for national dissemination and implementation of collaborative care. The resulting product of the EBQI process is referred to herein as a "National Dissemination Plan" (NDP. EBQI participants included: a researchers with expertise on the collaborative care model for depression, clinical quality improvement, and implementation science, and b VA clinical and administrative leaders with experience and expertise on how to adapt research evidence to organizational needs, resources and capacity. Based on EBQI participant feedback, drafts of the NDP were revised and refined over multiple iterations before a final version was approved by MH-QUERI leadership. 'Action Teams' were created to address each goal. A formative evaluation framework and related tools were developed to document processes, monitor progress, and identify and act upon barriers and facilitators in addressing NDP goals. Results The National Dissemination Plan suggests that effectively disseminating collaborative care for depression in the VA will likely require attention to: Guidelines and Quality Indicators (4 goals, Training in Clinical Processes and Evidence-based Quality Improvement (6 goals, Marketing (7 goals, and Informatics Support (1 goal. Action Teams are using the NDP as a blueprint for developing infrastructure to support system-wide adoption and sustained implementation of

  2. Sport-specific nutrition: practical strategies for team sports.

    Science.gov (United States)

    Holway, Francis E; Spriet, Lawrence L

    2011-01-01

    Implementation of a nutrition programme for team sports involves application of scientific research together with the social skills necessary to work with a sports medicine and coaching staff. Both field and court team sports are characterized by intermittent activity requiring a heavy reliance on dietary carbohydrate sources to maintain and replenish glycogen. Energy and substrate demands are high during pre-season training and matches, and moderate during training in the competitive season. Dietary planning must include enough carbohydrate on a moderate energy budget, while also meeting protein needs. Strength and power team sports require muscle-building programmes that must be accompanied by adequate nutrition, and simple anthropometric measurements can help the nutrition practitioner monitor and assess body composition periodically. Use of a body mass scale and a urine specific gravity refractometer can help identify athletes prone to dehydration. Sports beverages and caffeine are the most common supplements, while opinion on the practical effectiveness of creatine is divided. Late-maturing adolescent athletes become concerned about gaining size and muscle, and assessment of maturity status can be carried out with anthropometric procedures. An overriding consideration is that an individual approach is needed to meet each athlete's nutritional needs.

  3. 76 FR 62439 - Savannah National Wildlife Refuge Complex, GA and SC; Final Comprehensive Conservation Plan and...

    Science.gov (United States)

    2011-10-07

    ... the comments we received and based on the professional judgment of the planning team, we selected... associated with long-term climate change and sea level rise. We will more aggressively manage invasive and exotic plant species by implementing a management plan, completing a baseline inventory, supporting...

  4. A crew resource management program tailored to trauma resuscitation improves team behavior and communication.

    Science.gov (United States)

    Hughes, K Michael; Benenson, Ronald S; Krichten, Amy E; Clancy, Keith D; Ryan, James Patrick; Hammond, Christopher

    2014-09-01

    Crew Resource Management (CRM) is a team-building communication process first implemented in the aviation industry to improve safety. It has been used in health care, particularly in surgical and intensive care settings, to improve team dynamics and reduce errors. We adapted a CRM process for implementation in the trauma resuscitation area. An interdisciplinary steering committee developed our CRM process to include a didactic classroom program based on a preimplementation survey of our trauma team members. Implementation with new cultural and process expectations followed. The Human Factors Attitude Survey and Communication and Teamwork Skills assessment tool were used to design, evaluate, and validate our CRM program. The initial trauma communication survey was completed by 160 team members (49% response). Twenty-five trauma resuscitations were observed and scored using Communication and Teamwork Skills. Areas of concern were identified and 324 staff completed our 3-hour CRM course during a 3-month period. After CRM training, 132 communication surveys and 38 Communication and Teamwork Skills observations were completed. In the post-CRM survey, respondents indicated improvement in accuracy of field to medical command information (p = 0.029); accuracy of emergency department medical command information to the resuscitation area (p = 0.002); and team leader identity, communication of plan, and role assignment (p = 0.001). After CRM training, staff were more likely to speak up when patient safety was a concern (p = 0.002). Crew Resource Management in the trauma resuscitation area enhances team dynamics, communication, and, ostensibly, patient safety. Philosophy and culture of CRM should be compulsory components of trauma programs and in resuscitation of injured patients. Copyright © 2014 American College of Surgeons. Published by Elsevier Inc. All rights reserved.

  5. 12 CFR 563b.500. - What management stock benefit plans may I implement?

    Science.gov (United States)

    2010-01-01

    ... 12 Banks and Banking 5 2010-01-01 2010-01-01 false What management stock benefit plans may I... management stock benefit plans may I implement? (a) During the 12 months after your conversion, you may... employee stock benefit plan (collectively, ESOP), and a management recognition plan (MRP), provided you...

  6. Countywide implementation of crisis intervention teams: Multiple methods, measures and sustained outcomes.

    Science.gov (United States)

    Kubiak, Sheryl; Comartin, Erin; Milanovic, Edita; Bybee, Deborah; Tillander, Elizabeth; Rabaut, Celeste; Bisson, Heidi; Dunn, Lisa M; Bouchard, Michael J; Hill, Todd; Schneider, Steven

    2017-09-01

    The crisis intervention team (CIT) is a tool that can be used to foster pre-booking diversion of individuals with mental illness from the criminal justice system and into community treatment services. Although CIT is often implemented solely as the training of law enforcement officers, the model stipulates that CIT is a vehicle for collaboration with community stakeholders who share a similar philosophy, as well as expanded mental health services offering a 24 hour-seven days per week drop-off option for law enforcement officers. This case study presents the countywide implementation of CIT and expands previous findings on the prevalence of officer interaction with persons with mental health issues and CIT training outcomes, including changes in officer perception of individuals with mental health issues. Furthermore, analysis of the disposition of calls for officer assistance coded as mental health or suicide found significant increases in officer drop-offs to the mental health crisis center post-CIT training. Interrupted time series analysis determined that this change has been sustained over time, perhaps owing to the unique communication between county law enforcement and mental health staff. Implications for policy and practice are discussed. Copyright © 2017 John Wiley & Sons, Ltd.

  7. Types of internal facilitation activities in hospitals implementing evidence-based interventions.

    Science.gov (United States)

    Baloh, Jure; Zhu, Xi; Ward, Marcia M

    2017-01-25

    Implementation models, frameworks, and theories recognize the importance of activities that facilitate implementation success. However, little is known about internal facilitation activities that hospital personnel engage in during implementation efforts. The aim of the study was to examine internal facilitation activities at 10 critical access hospitals in rural Iowa during their implementation of TeamSTEPPS, a patient safety intervention, and to identify characteristics that distinguish different types of facilitation activities. We followed 10 critical access hospitals for 2 years after the onset of implementation, conducting quarterly interviews with key informants. On the basis of the transcripts from the first two quarters, a coding template was developed using inductive analyses. The template was then applied deductively to code all interview transcripts. Using comparative analysis, we examined the characteristics that distinguish between the facilitation types. We identified four types of facilitation activities-Leadership, Buy-in, Customization, and Accountability. Individuals and teams engaged in different types of facilitation activities, both in a planned and an ad hoc manner. These activities targeted at both people and practices and exhibited varying temporal patterns (start and peak time). There are four types of facilitation activities that hospitals engage in while implementing evidence-based practices, offering a parsimonious way to characterize facilitation activities. New theoretical and empirical research opportunities are discussed. Understanding the types of facilitation activities and their distinguishing characteristics can assist managers in planning and executing implementations of evidence-based interventions.

  8. Operational Readiness Review Implementation Plan for the K Basin Fuel Transfer System

    International Nuclear Information System (INIS)

    DAVIES, T.H.

    2002-01-01

    This implementation plan has been prepared to comply with the requirements of U.S. Department of Energy (DOE) Order 425.1A, Startup and Restart of Nuclear Facilities, and DOE-STD-3006-2000, Planning and Conduct of Operational Readiness Reviews (ORR) (DOE 2002). The scope of the ORR is described in the contractor K Basin Fuel Transfer System (FTS) Plan of Action (POA), which was prepared by Spent Nuclear Fuel (SNF) Project line management and approved by the DOE Richland Operations Office (RL) Manager on April 4, 2002 (FH 2002a). While the Project Hanford Management Contractor has been revised to include DOE Order 425.1B, the contractor implementing procedure, ''F-PRO-055, Startup Readiness (Revision 9) has not yet been approved by RL for contractor use. Appendix A provides a crosswalk between the requirements of DOE Order 425.1A and DOE Order 425.1B to show that all requirements of DOE 425.1B are covered by this implementation plan. DOE Order 425.1B indicates that the Secretarial Officer is the Authorization Authority when substantial modifications are made to a Hazard Category 2 nuclear facility. This Authorization Authority has been delegated to the RL Manager by memorandum from Jessie Hill Roberson, dated November 20, 2001 (Roberson 2001). The scope of the ORR is described in the RL Plan of Action, K Basin Fuel Transfer System, prepared by DOE project line management and approved by the RL Manager, the designated approval authority, on September 12, 2002 (Schlender 2002). This implementation plan provides the overall approach and guidelines for performance of the DOE ORR. Appendix B contains the Criteria and Review Approach Documents (CRAD), which define the review objectives and criteria as well as the approach for assessing each objective. ORR results will be published in a final report, as discussed in Section 9.4

  9. American Historical Association Faculty Development Program: Planning and Implementation.

    Science.gov (United States)

    Hoffmann, Charles

    The planning and implementation processes of the Long Island Faculty Development Program are described. Originally sponsored by the American Historical Association's Faculty Development Program to improve history instruction, this project includes faculty representatives from four Long Island universities, colleges, and junior colleges. The…

  10. Implementation Issues for Departure Planning Systems

    Science.gov (United States)

    Hansman, R. John; Feron, Eric; Clarke, John-Paul; Odoni, Amedeo

    1999-01-01

    The objective of the proposed effort is to investigate issues associated with the design and implementation of decision aiding tools to assist in improving the departure process at congested airports. This effort follows a preliminary investigation of potential Departure Planning approaches and strategies, which identified potential benefits in departure efficiency, and also in reducing the environmental impact of aircraft in the departure queue. The preliminary study bas based, in large part, on observations and analysis of departure processes at Boston, Logan airport. The objective of this follow-on effort is to address key implementation issues and to expand the observational base to include airports with different constraints and traffic demand. Specifically, the objectives of this research are to: (1) Expand the observational base to include airports with different underlying operational dynamics. (2) Develop prototype decision aiding algorithms/approaches and assess potential benefits. and (3) Investigate Human Machine Integration (HMI) issues associated with decision aids in tower environments.

  11. Juggling Act: Re-Planning and Building on Observatory...Simultaneously!

    Science.gov (United States)

    Zavala, Eddie; Daws, Patricia

    2011-01-01

    SOFIA (Stratospheric Observatory for Infrared Astronomy) is a major SMD program that has been required to meet several requirements and implement major planning and business initiatives overthe past 1 1/2 years, in the midst of system development and flight test phases. The program was required to implementing JCL and EVM simultaneously, as well as undergo a major replan and Standing Review Board - and all without impacting technical schedule progress. The team developed innovative processes that met all the requirements, and improved Program Management process toolsets. The SOFIA team, being subject to all the typical budget constraints, found ways to leverage existing roles in new ways to meet the requirements without creating unmanageable overhead. The team developed strategies and value added processes - such as improved risk identification, structured reserves management, cost/risk integration - so that the effort expended resulted in a positive return to the program.

  12. Implementation Plan for a Common Nordic Retail Market. Evaluation of the responses on the public consultation

    Energy Technology Data Exchange (ETDEWEB)

    2010-09-15

    Draft implementation plan for a common Nordic Retail Market was developed in close cooperation with relevant stakeholders in the Nordic electricity market during winter and spring 2010. The implementation plan outlines what should be done, by whom and when in order to create a common Nordic end user market over the coming years. NordREG organised a public consultation on the draft implementation plan from the end of June until the beginning of the August, 2010 and received 25 responses from stakeholders. This evaluation report includes summary of stakeholders' responses and NordREG comments on stakeholders' views. The evaluation of the responses has been taken into account during the finalization of the implementation plan

  13. Kaizen planning, implementing and controlling

    CERN Document Server

    García-Alcaraz, Jorge Luis; Maldonado-Macías, Aidé Aracely

    2017-01-01

    This book reports a literature review on kaizen, its industrial applications, critical success factors, benefits gained, journals that publish about it, main authors (research groups) and universities. Kaizen is treated in this book in three stages: planning, implementation and control. The authors provide a questionnaire designed with activities in every stage, highlighting the benefits gained in each stage. The study has been applied to more than 400 managers and leaders in continuous improvement in Mexican maquiladoras. A univariate analysis is provided to the activities in every stage. Moreover, structural equation models associating those activities with the benefits gained are presented for a statistical validation. Such a relationship between activities and benefits helps managers to identify the most important factor affecting their benefits and financial income.

  14. Strategic Planning: Contextual Factors that Facilitated and/or Challenged the Implementation of Strategic Planning in Two Nonprofit Organizations

    Science.gov (United States)

    Masilamony, Davadhasan

    2010-01-01

    As the nonprofit sector continues to grow in size and importance in American society, successful organizations proactively initiate strategic planning so they can be more responsive to changing circumstances, underlying trends, and shifting demands. At times, however, organizations develop elaborate plans that are never implemented. Unfortunately,…

  15. Y-12 Site Sustainability Plan

    Energy Technology Data Exchange (ETDEWEB)

    Sherry, T D; Kohlhorst, D P; Little, S K

    2011-12-01

    The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the DOE and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the Guiding Principles. Specifically, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP) while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. Table ES.2 gives a comprehensive overview of Y-12's performance status and planned actions. B&W Y-12's Energy Management mission is to incorporate renewable energy and energy efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. During FY 2011, the site formed a sustainability team (Fig. ES.1). The sustainability team provides a coordinated approach to meeting the various sustainability requirements and serves as a forum for increased communication and consistent implementation of sustainability activities at Y-12. The sustainability team serves as an information exchange mechanism to promote general awareness of sustainability information, while providing a system to document progress and to identify resources. These resources are necessary to implement activities that support the overall goals of sustainability, including reducing the use of resources and conserving energy. Additionally, the team's objectives include: (1) Foster a Y-12-wide philosophy to conserve resources; (2) Reduce the impacts of production operations in a cost-effective manner; (3) Increase materials recycling; (4) Use a minimum amount of energy and fuel; (5) Create a minimum of waste and pollution in achieving Y-12-strategic objectives; (6) Develop and implement techniques, technologies, process modifications, and programs that support sustainable acquisition; (7) Minimize the

  16. Project Hanford management contract quality improvement project management plan; TOPICAL

    International Nuclear Information System (INIS)

    ADAMS, D.E.

    1999-01-01

    On July 13, 1998, the U.S. Department of Energy, Richland Operations Office (DOE-RL) Manager transmitted a letter to Fluor Daniel Hanford, Inc. (FDH) describing several DOE-RL identified failed opportunities for FDH to improve the Quality Assurance (QA) Program and its implementation. In addition, DOE-RL identified specific Quality Program performance deficiencies. FDH was requested to establish a periodic reporting mechanism for the corrective action program. In a July 17, 1998 response to DOE-RL, FDH agreed with the DOE concerns and committed to perform a comprehensive review of the Project Hanford Management Contract (PHMC) QA Program during July and August, 1998. As a result, the Project Hanford Management Contract Quality Improvement Plan (QIP) (FDH-3508) was issued on October 21, 1998. The plan identified corrective actions based upon the results of an in-depth Quality Program Assessment. Immediately following the scheduled October 22, 1998, DOE Office of Enforcement and Investigation (EH-10) Enforcement Conference, FDH initiated efforts to effectively implement the QIP corrective actions. A Quality Improvement Project (QI Project) leadership team was assembled to prepare a Project Management Plan for this project. The management plan was specifically designed to engage a core team and the support of representatives from FDH and the major subcontractors (MSCs) to implement the QIP initiatives; identify, correct, and provide feedback as to the root cause for deficiency; and close out the corrective actions. The QI Project will manage and communicate progress of the process

  17. School Counselor Lead Initial Individual Career and Academic Plan Implementation Design

    Science.gov (United States)

    Moeder-Chandler, Markus

    2017-01-01

    In Fall of 2014 for Fountain-Fort Carson School District #8 undertook a revamping of graduation and state-mandated ICAP requirements for implementation for the graduating class of 2021. This design and implementation process included numerous stakeholders and several years of planning from Fall of 2014 to Spring of 2017. The design and…

  18. Recommendation 93-5 Implementation Plan

    International Nuclear Information System (INIS)

    1994-01-01

    On July 19, 1993, the Defense Nuclear Facilities Safety Board (DNFSB) provided to the Secretary of Energy its Recommendation 93-5, which commented on the Hanford Tank Waste Characterization effort. Recommendation 93-5 highlighted the need to accelerate the characterization of the Hanford Site tank wastes to expedite the resolution of identified tank safety issues, and to provide timely design data in support of activities addressing the disposal of the tank wastes. The Department of Energy (DOE) and its prime contractor, Westinghouse Hanford Company (WHC), are in full agreement with the content of Recommendation 93-5 and have prepared this Implementation Plan to document those actions that have been or will be taken to meet Recommendation 93-5. The new Characterization Strategy embodied by this Plan acknowledges that waste distribution within a tank is the critical unknown with respect to successfully characterizing the tank for any Tank Waste Remediation Systems (TWRS) programmatic need. The new strategy has been incorporated into the following seven task: (1) strengthen technical management; (2) accelerate safety related characterization; (3) improve the quality and quantity of sampling (4) streamline tank access; (5) improve the quality and quantity of analyses; (6) improve data management; and (7) change control

  19. 77 FR 52277 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-08-29

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... rule. SUMMARY: EPA is proposing approval of a permitting rule submitted for the South Coast Air Quality Management District (District) portion of the California State Implementation Plan (SIP). The State is...

  20. 77 FR 73320 - Approval of Air Quality Implementation Plans; California; South Coast Air Quality Management...

    Science.gov (United States)

    2012-12-10

    ... Quality Implementation Plans; California; South Coast Air Quality Management District; Prevention of... Implementation Plan (SIP) revision for the South Coast Air Quality Management District (SCAQMD or District... in a August 15, 2012 letter from the South Coast Air Quality Management District regarding specific...

  1. DOE handbook: Integrated safety management systems (ISMS) verification. Team leader's handbook

    International Nuclear Information System (INIS)

    1999-06-01

    The primary purpose of this handbook is to provide guidance to the ISMS verification Team Leader and the verification team in conducting ISMS verifications. The handbook describes methods and approaches for the review of the ISMS documentation (Phase I) and ISMS implementation (Phase II) and provides information useful to the Team Leader in preparing the review plan, selecting and training the team, coordinating the conduct of the verification, and documenting the results. The process and techniques described are based on the results of several pilot ISMS verifications that have been conducted across the DOE complex. A secondary purpose of this handbook is to provide information useful in developing DOE personnel to conduct these reviews. Specifically, this handbook describes methods and approaches to: (1) Develop the scope of the Phase 1 and Phase 2 review processes to be consistent with the history, hazards, and complexity of the site, facility, or activity; (2) Develop procedures for the conduct of the Phase 1 review, validating that the ISMS documentation satisfies the DEAR clause as amplified in DOE Policies 450.4, 450.5, 450.6 and associated guidance and that DOE can effectively execute responsibilities as described in the Functions, Responsibilities, and Authorities Manual (FRAM); (3) Develop procedures for the conduct of the Phase 2 review, validating that the description approved by the Approval Authority, following or concurrent with the Phase 1 review, has been implemented; and (4) Describe a methodology by which the DOE ISMS verification teams will be advised, trained, and/or mentored to conduct subsequent ISMS verifications. The handbook provides proven methods and approaches for verifying that commitments related to the DEAR, the FRAM, and associated amplifying guidance are in place and implemented in nuclear and high risk facilities. This handbook also contains useful guidance to line managers when preparing for a review of ISMS for radiological

  2. Curriculum Integration Using Enterprise Resource Planning: An Integrative Case Approach

    Science.gov (United States)

    Cannon, David M.; Klein, Helen A; Koste, Lori L.; Magal, Simha R.

    2004-01-01

    Efforts to achieve greater curriculum integration in schools of business have included team teaching, student group projects, multidisciplinary cases, and, more recently, the use of enterprise resource planning (ERP) systems. Although these approaches are beneficial, they tend to be implemented on an ad hoc basis rather than through curriculum…

  3. Strategies and Exemplars for Public Outreach Events: Planning, Implementation, Evaluation

    Science.gov (United States)

    Cobb, W. H.; Buxner, S.; Shipp, S. S.; Shebby, S.

    2015-12-01

    IntroductionEach year the National Aeronautics and Space Administration (NASA) sponsors a variety of public outreach events to share information with educators, students, and the general public. These events are designed to increase interest in and awareness of the mission and goals of NASA. Planning and implementation best practices gleaned from the NASA SMD Education's review of large-scale events, "Best Practices in Outreach Events" will be shared. Outcomes from an event, i C Ceres, celebrating the Dawn mission's arrival at dwarf planet Ceres that utilized these strategies will be shared. Best practices included can be pertinent for all event organizers and evaluators regardless of event size. BackgroundThe literature review focused on identifying evaluations of large-scale public outreach events—and, within these evaluations, identifying best practices. The following criteria for identifying journal articles and reports to potentially include: Public, science-related events open to adults and children. Events with more than 1,000 attendees. Events that occurred during the last 5 years. Evaluations that included information on data collected from visitors and/or volunteers. Evaluations that specified the type of data collected, methodology, and associated results. Planning and Implementation Best PracticesThe literature review revealed key considerations for planning and of large-scale events implementing events. A summary of related best practices is presented below. 1) Advertise the event 2) Use and advertise access to scientists 3) Recruit scientists using these findings 4) Ensure that the event is group and particularly child friendly 5) Target specific event outcomes Best Practices Informing Real-world Planning, Implementation and EvaluationDawn mission's collaborative design of a series of events, i C Ceres, including in-person, interactive events geared to families and live presentations will be shared. Outcomes and lessons learned will be imparted

  4. The implementation of an elementary STEM learning team and the effect on teacher self-efficacy: An action research study

    Science.gov (United States)

    Hernandez, Jennifer F.

    Science, technology, engineering, and math (STEM) education is part of a national movement to prepare students for the demands of a 21st century workforce. STEM uses an integrated, real-world problem solving approach to increase the levels of collaboration, communication, critical, and creative thinking in students. If expectations for students have increased to stay competitive in a global market, teachers must be equipped to meet the needs of the new 21st century learners in their classrooms. To that end, professional learning for educators is essential to ensure they are equipped with the tools necessary for success. While there are many approaches to teacher development, professional learning teams, based on the work of Garmston and Wellman, focus on teachers' instructional delivery, targeted student learning needs, planning, implementing new strategies, collaboration, and reflective dialogue. The purpose of the study is to improve instructional practice providing quality STEM instruction to students and increase teacher self-efficacy---a teachers' perception of his or her ability to instruct students in the STEM disciplines. Theoretical implications of a study on an elementary STEM learning team could affect the way schools deliver STEM professional learning opportunities to teachers and the way students are delivered a quality STEM education. Research has shown that Model I behavior would limit the change process of professional learning through a surface inspection of the issues; however model II behaviors would benefit the teachers, students and organization because teachers would be collaborating on specific objectives to develop a knowledge base and skill set to meet students' needs. Extending professional development by engaging stakeholders in a collaborative process to build model II behaviors will create an organizational structure that facilitates learning.

  5. 324 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    BARILO, N.F.

    1999-01-01

    In March 1998, the 324 Building Fire Hazards Analysis (FHA) (Reference 1) was approved by the U S. Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (BWHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in six areas and provided 20 recommendations to bring the 324 Building into compliance with DOE Order 5480 7A. Additionally, one observation was provided. A status is provided for each recommendation in this document. The actions for recommendations associated with the safety related part of the 324 Building and operation of the cells and support areas were evaluated using the Unreviewed Safety Question (USQ) process BWHC will use this Implementation Plan to bring the 324 Building and its operation into compliance with DOE Order 5480 7A and RLID 5480.7

  6. 75 FR 48895 - Approval and Promulgation of Air Quality Implementation Plans; MN

    Science.gov (United States)

    2010-08-12

    ... Promulgation of Air Quality Implementation Plans; MN AGENCY: Environmental Protection Agency (EPA). ACTION... Plan (SIP) for sulfur dioxide (SO 2 ). The Minnesota Pollution Control Agency submitted the SIP... request would revise SIP requirements applicable to Saint Mary's Hospital, located in Rochester, Minnesota...

  7. Improving patient care through student leadership in team quality improvement projects.

    Science.gov (United States)

    Tschannen, Dana; Aebersold, Michelle; Kocan, Mary Jo; Lundy, Francene; Potempa, Kathleen

    2015-01-01

    In partnership with a major medical center, senior-level nursing students completed a root cause analysis and implementation plan to address a unit-specific quality issue. To evaluate the project, unit leaders were asked their perceptions of the value of the projects and impact on patient care, as well as to provide exemplars depicting how the student root cause analysis work resulted in improved patient outcome and/or unit processes. Liaisons noted benefits of having an RCA team, with positive impact on patient outcomes and care processes.

  8. Modeling the Office of Science ten year facilities plan: The PERI Architecture Tiger Team

    International Nuclear Information System (INIS)

    Supinski, Bronis R de; Gamblin, Todd; Schulz, Martin

    2009-01-01

    The Performance Engineering Institute (PERI) originally proposed a tiger team activity as a mechanism to target significant effort optimizing key Office of Science applications, a model that was successfully realized with the assistance of two JOULE metric teams. However, the Office of Science requested a new focus beginning in 2008: assistance in forming its ten year facilities plan. To meet this request, PERI formed the Architecture Tiger Team, which is modeling the performance of key science applications on future architectures, with S3D, FLASH and GTC chosen as the first application targets. In this activity, we have measured the performance of these applications on current systems in order to understand their baseline performance and to ensure that our modeling activity focuses on the right versions and inputs of the applications. We have applied a variety of modeling techniques to anticipate the performance of these applications on a range of anticipated systems. While our initial findings predict that Office of Science applications will continue to perform well on future machines from major hardware vendors, we have also encountered several areas in which we must extend our modeling techniques in order to fulfill our mission accurately and completely. In addition, we anticipate that models of a wider range of applications will reveal critical differences between expected future systems, thus providing guidance for future Office of Science procurement decisions, and will enable DOE applications to exploit machines in future facilities fully.

  9. Key factors in the successful implementation of enterprise resource planning system

    Directory of Open Access Journals (Sweden)

    Farajollah Rahnavard

    2014-04-01

    Full Text Available Enterprise Resource Planning Systems (ERP are considered as the newest and most effective tools of enterprise resource planning and include an interconnected information, management and engineering system that meets all the needs of an organization. ERP implementation is costly and time-consuming and makes fundamental change in the process, if not implemented correctly it will cause challenges in most parts of the organization and will certainly fail. Therefore, the identification of key success factors in implementing ERP helps organizations avoid the loss of the project. This research aims to identify key success factors for ERP by examining 185 managers, professionals, experts of the Information and Communication Technology Institute associated with the Ministry of Communications and Information Technology of Iran. A questionnaire was used to collect data. Findings from exploratory factor analysis indicate that five factors: 1 user friendliness, flexible and consistency 2 establishment of project management; 3 alignment with user needs; 4 Management of organizational changes, and 5 observing the principles of successful implementation of ERP affect the institute and the corresponding suggestions are proposed consistent with these findings.

  10. Leader Humility and Team Innovation: Investigating the Substituting Role of Task Interdependence and the Mediating Role of Team Voice Climate.

    Science.gov (United States)

    Liu, Wenxing; Mao, Jianghua; Chen, Xiao

    2017-01-01

    Leadership has been found to be linked with team innovation. Based on social information processing theory and substitutes for leadership theory, this paper examines the influence of leader humility on team innovation. Results from 90 teams showed that leader humility will enhance team innovation by fostering team voice climate. Further, task interdependence substitutes the effect of leader humility on team innovation through an indirect way via team voice climate. This study discussed the theoretical and practical implementations of these observations.

  11. Leader Humility and Team Innovation: Investigating the Substituting Role of Task Interdependence and the Mediating Role of Team Voice Climate

    Directory of Open Access Journals (Sweden)

    Wenxing Liu

    2017-06-01

    Full Text Available Leadership has been found to be linked with team innovation. Based on social information processing theory and substitutes for leadership theory, this paper examines the influence of leader humility on team innovation. Results from 90 teams showed that leader humility will enhance team innovation by fostering team voice climate. Further, task interdependence substitutes the effect of leader humility on team innovation through an indirect way via team voice climate. This study discussed the theoretical and practical implementations of these observations.

  12. 78 FR 7703 - Revisions to the California State Implementation Plan, South Coast Air Quality Management...

    Science.gov (United States)

    2013-02-04

    ... the California State Implementation Plan, South Coast Air Quality Management District, Proposed Rule... approve a revision to the South Coast Air Quality Management District (SCAQMD) portion of the California... digesters. Rule 1127 was designed to implement the 2003 Air Quality Management Plan (AQMP) control measure...

  13. 75 FR 25775 - Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District

    Science.gov (United States)

    2010-05-10

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2009-0573; FRL-9146-5] Disapproval of State Implementation Plan Revisions, South Coast Air Quality Management District AGENCY: Environmental... South Coast Air Quality Management District (SCAQMD) portion of the California State Implementation Plan...

  14. 78 FR 40966 - Approval and Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport...

    Science.gov (United States)

    2013-07-09

    ... Promulgation of Air Quality Implementation Plans; New Mexico; Interstate Transport of Fine Particulate Matter... a State Implementation Plan (SIP) submittal from the State of New Mexico to address Clean Air Act (CAA or Act) requirements that prohibit air emissions which will contribute significantly to...

  15. Managing Water for African Cities Johannesburg City Implementation Plan Environmental Component Appraisal Report

    OpenAIRE

    Damhaug, T.

    2000-01-01

    Årsliste 2000 This is an appraisal of the environmental component of the Johannesburg City Implementation Plan under the Habitat guided programme "Managing Water for African Cities". The objective of this appraisal was to ensure the conformity of the plan with the objectives of the Regional Project and South Africa's needs and to explore the availability of domestic resources (human, institutional, and financial) required for efficient project implementation. The environmental component wi...

  16. Implementation of enterprise resource planning systems: a user perspective

    Science.gov (United States)

    Reitsma, E.; Hilletofth, P.; Mukhtar, U.

    2018-04-01

    The purpose of this study is to evaluate critical success factors (CSFs) for the implementation of an enterprise resource planning (ERP) system from a user perspective. Users play a vital role when implementing an ERP system, but their perspective has been neglected in the literature. A better understanding of their perspective promises to contribute to the design of more effective ERP systems, its implementation, and management. In order to identify the user perspective, a survey was conducted within three Pakistani companies that recently have implemented a new ERP system. The questionnaire was developed based on thirteen CSFs deduced from literature. Based on each CSF’s level of importance, they are ranked in order of importance and divided into three groups: most important, important and not important. Findings reveal that users believe that management should prioritize the following four CSFs when implementing an ERP system: education and training, strategic decision-making, communication, and business process alignment.

  17. Using Theories of Change to inform implementation of health systems research and innovation: experiences of Future Health Systems consortium partners in Bangladesh, India and Uganda.

    Science.gov (United States)

    Paina, Ligia; Wilkinson, Annie; Tetui, Moses; Ekirapa-Kiracho, Elizabeth; Barman, Debjani; Ahmed, Tanvir; Mahmood, Shehrin Shaila; Bloom, Gerry; Knezovich, Jeff; George, Asha; Bennett, Sara

    2017-12-28

    The Theory of Change (ToC) is a management and evaluation tool supporting critical thinking in the design, implementation and evaluation of development programmes. We document the experience of Future Health Systems (FHS) Consortium research teams in Bangladesh, India and Uganda with using ToC. We seek to understand how and why ToCs were applied and to clarify how they facilitate the implementation of iterative intervention designs and stakeholder engagement in health systems research and strengthening. This paper combines literature on ToC, with a summary of reflections by FHS research members on the motivation, development, revision and use of the ToC, as well as on the benefits and challenges of the process. We describe three FHS teams' experiences along four potential uses of ToCs, namely planning, communication, learning and accountability. The three teams developed ToCs for planning and evaluation purposes as required for their initial plans for FHS in 2011 and revised them half-way through the project, based on assumptions informed by and adjusted through the teams' experiences during the previous 2 years of implementation. All teams found that the revised ToCs and their accompanying narratives recognised greater feedback among intervention components and among key stakeholders. The ToC development and revision fostered channels for both internal and external communication, among research team members and with key stakeholders, respectively. The process of revising the ToCs challenged the teams' initial assumptions based on new evidence and experience. In contrast, the ToCs were only minimally used for accountability purposes. The ToC development and revision process helped FHS research teams, and occasionally key local stakeholders, to reflect on and make their assumptions and mental models about their respective interventions explicit. Other projects using the ToC should allow time for revising and reflecting upon the ToCs, to recognise and document the

  18. Implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory

    International Nuclear Information System (INIS)

    Bullock, M.G.; Rodriguez, R.R.

    1987-05-01

    This document presents the current implementation plans for buried transuranic waste and stored special-case waste at the Idaho National Engineering Laboratory. Information contained in this report was also included in several Department of Energy (DOE) planning documents for the Defense Transuranic Waste Program. This information can be found in the following DOE documents: Comprehensive Implementation Plan for the DOE Defense Buried TRU Waste Program; Defense Waste Management Plan for Buried Transuranic-Contaminated Waste, Transuranic-Contaminated Waste, Transuranic-Contaminated Soil, and Difficult-to-Certify Transuranic Waste; and Defense Special-Case Transuranic Waste Implementation Plan. 11 refs

  19. Building the dream team: don't make it a nightmare.

    Science.gov (United States)

    Nelson, M; Nelson, S

    1997-11-01

    This article covers the often overlooked area of team management concepts through a discussion of what many companies have done to implement these new concepts successfully. It describes the basics of how to and also explains why people resist the process of implementation. The main topics are (1) team formation, (2) pitfalls to avoid, and (3) team measurement.

  20. A literature review for large-scale health information system project planning, implementation and evaluation.

    Science.gov (United States)

    Sligo, Judith; Gauld, Robin; Roberts, Vaughan; Villa, Luis

    2017-01-01

    Information technology is perceived as a potential panacea for healthcare organisations to manage pressure to improve services in the face of increased demand. However, the implementation and evaluation of health information systems (HIS) is plagued with problems and implementation shortcomings and failures are rife. HIS implementation is complex and relies on organisational, structural, technological, and human factors to be successful. It also requires reflective, nuanced, multidimensional evaluation to provide ongoing feedback to ensure success. This article provides a comprehensive review of the literature about evaluating and implementing HIS, detailing the challenges and recommendations for both evaluators and healthcare organisations. The factors that inhibit or promote successful HIS implementation are identified and effective evaluation strategies are described with the goal of informing teams evaluating complex HIS. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  1. 76 FR 54384 - California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of...

    Science.gov (United States)

    2011-09-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2011-0537; FRL-9457-6] California State Implementation Plan, South Coast Air Quality Management District; Withdrawal of Direct Final Rule... Implementation Plan (SIP). This revision concerned South Coast Air Quality Management District (SCAQMD) Rule 1143...

  2. 77 FR 64445 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2012-0541; FRL 9733-5] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... Illinois State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located...

  3. 77 FR 64422 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC...

    Science.gov (United States)

    2012-10-22

    ... Promulgation of Air Quality Implementation Plans; Illinois; Greif Packaging, LLC Adjusted Standard AGENCY... State Implementation Plan (SIP) an adjusted standard for the Greif Packaging, LLC facility located at 5... submitted an Adjusted Standard for the Greif Packaging, LLC facility located at 5 S 220 Frontenac Road in...

  4. 77 FR 24148 - Revision to the Hawaii State Implementation Plan, Minor New Source Review Program

    Science.gov (United States)

    2012-04-23

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0213; FRL-9661-6] Revision to the Hawaii State Implementation Plan, Minor New Source Review Program AGENCY: Environmental Protection Agency... final action to approve revisions to the Hawaii State Implementation Plan (SIP). These revisions would...

  5. 77 FR 24440 - Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year...

    Science.gov (United States)

    2012-04-24

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R04-OAR-2010-0021(b); FRL-9661-9] Approval and Promulgation of Implementation Plans; Georgia; Atlanta; Ozone 2002 Base Year Emissions Inventory AGENCY... 2002 base year emissions inventory portion of the state implementation plan (SIP) revision submitted by...

  6. 75 FR 81484 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-12-28

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9243-1] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... State Implementation Plan (SIP) that create and amend the Emissions Banking and Trading of Allowances...

  7. What is needed to implement a web-based audit and feedback intervention with outreach visits to improve care quality: A concept mapping study among cardiac rehabilitation teams.

    Science.gov (United States)

    van Engen-Verheul, Mariëtte M; Peek, Niels; Haafkens, Joke A; Joukes, Erik; Vromen, Tom; Jaspers, Monique W M; de Keizer, Nicolette F

    2017-01-01

    Evidence on successful quality improvement (QI) in health care requires quantitative information from randomized clinical trials (RCTs) on the effectiveness of QI interventions, but also qualitative information from professionals to understand factors influencing QI implementation. Using a structured qualitative approach, concept mapping, this study determines factors identified by cardiac rehabilitation (CR) teams on what is needed to successfully implement a web-based audit and feedback (A&F) intervention with outreach visits to improve the quality of CR care. Participants included 49 CR professionals from 18 Dutch CR centres who had worked with the A&F system during a RCT. In three focus group sessions participants formulated statements on factors needed to implement QI successfully. Subsequently, participants rated all statements for importance and feasibility and grouped them thematically. Multi dimensional scaling was used to produce a final concept map. Forty-two unique statements were formulated and grouped into five thematic clusters in the concept map. The cluster with the highest importance was QI team commitment, followed by organisational readiness, presence of an adequate A&F system, access to an external quality assessor, and future use and functionalities of the A&F system. Concept mapping appeared efficient and useful to understand contextual factors influencing QI implementation as perceived by healthcare teams. While presence of a web-based A&F system and external quality assessor were seen as instrumental for gaining insight into performance and formulating QI actions, QI team commitment and organisational readiness were perceived as essential to actually implement and carry out these actions. These two sociotechnical factors should be taken into account when implementing and evaluating the success of QI implementations in future research. Copyright © 2016. Published by Elsevier Ireland Ltd.

  8. An overview and guide: planning instructional radio.

    Science.gov (United States)

    Imhoof, M

    1984-03-01

    activities utilized in broadcasts which are contrary to the learners' experience will at best seem strange and at worst be incomprehensible. Curriculum development in an instructional radio project adds more complexity to the planner's task. The most important information needed is whether a new curriculum is to be developed or whether the existing curriculum is to be adapted for radio. Another major analysis task is relating the curriculum to the medium. The project planning team needs to understand the research aims and evaluation methods in instructional radio projects. Sometimes an outside evaluation specialist or team is employed, but in many projects the planning team is responsible for implementing the research design, carrying out the development activities, gathering data, and evaluating the project. Subject matter testing is another technical area of expertise needed by the project team.

  9. Strengthening scaling up through learning from implementation: comparing experiences from Afghanistan, Bangladesh and Uganda.

    Science.gov (United States)

    Bennett, Sara; Mahmood, Shehrin Shaila; Edward, Anbrasi; Tetui, Moses; Ekirapa-Kiracho, Elizabeth

    2017-12-28

    Many effective innovations and interventions are never effectively scaled up. Implementation research (IR) has the promise of supporting scale-up through enabling rapid learning about the intervention and its fit with the context in which it is implemented. We integrate conceptual frameworks addressing different dimensions of scaling up (specifically, the attributes of the service or innovation being scaled, the actors involved, the context, and the scale-up strategy) and questions commonly addressed by IR (concerning acceptability, appropriateness, adoption, feasibility, fidelity to original design, implementation costs, coverage and sustainability) to explore how IR can support scale-up. We draw upon three IR studies conducted by Future Health Systems (FHS) in Afghanistan, Bangladesh and Uganda. We reviewed project documents from the period 2011-2016 to identify information related to the dimensions of scaling up. Further, for each country, we developed rich descriptions of how the research teams approached scaling up, and how IR contributed to scale-up. The rich descriptions were checked by FHS research teams. We identified common patterns and differences across the three cases. The three cases planned quite different innovations/interventions and had very different types of scale-up strategies. In all three cases, the research teams had extensive prior experience within the study communities, and little explicit attention was paid to contextual factors. All three cases involved complex interactions between the research teams and other stakeholders, among stakeholders, and between stakeholders and the intervention. The IR planned by the research teams focussed primarily on feasibility and effectiveness, but in practice, the research teams also had critical insights into other factors such as sustainability, acceptability, cost-effectiveness and appropriateness. Stakeholder analyses and other project management tools further complemented IR. IR can provide

  10. STUDENT TEAMS-ACHIEVEMENT DIVISION TO IMPROVE STUDENTS’ WRITING SKILL

    Directory of Open Access Journals (Sweden)

    Sri Wahyuni

    2015-09-01

    Full Text Available Acquiring writing skill needs a lot of practices, and to produce a piece of writing needs a long process; hence, the appropriate method of the teaching and learning is very important to help students master writing skill. This article aims at reporting a research on the implementation of Student Teams-Achievement Division (STAD as an alternative teaching method to improve students’ writing skill. Through Classroom Action Research design, the researcher did the research at fourth semester students of English Education study program of STAIN Kediri in academic year 2012-1013. The research procedures are planning, implementing, observing, and reflecting. The findings show that the implementation of STAD can improve the students’ writing skill which were indicated by the high percentage of the students’ active involvement and positive response on the implementation, and the students’ product of writing in which all of writing components can achieve good level in marking scheme as the minimum level.

  11. 75 FR 69909 - Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of...

    Science.gov (United States)

    2010-11-16

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R06-OAR-2005-TX-0012; FRL-9226-3] Approval and Promulgation of Implementation Plans; Texas; Emissions Banking and Trading of Allowances Program AGENCY... four revisions to the Texas State Implementation Plan (SIP) that create and amend the Emissions Banking...

  12. Fiscal years 1994--1998 Information Technology Strategic Plan

    International Nuclear Information System (INIS)

    1993-11-01

    A team of senior managers from across the US Nuclear Regulatory Commission (NRC), working with the Office of Information Resources Management (IRM), has completed an NRC Strategic Information Technology (IT) Plan. The Plan addresses three major areas: (1) IT Program Management, (2) IT Infrastructure, and (3) Information and Applications Management. Key recommendations call for accelerating the replacement of Agency workstations, implementing a new document management system, applying business process reengineering to selected Agency work processes, and establishing an Information Technology Council to advise the Director of IRM

  13. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    Science.gov (United States)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  14. A multidisciplinary approach to team nursing within a low secure service: the team leader role.

    Science.gov (United States)

    Nagi, Claire; Davies, Jason; Williams, Marie; Roberts, Catherine; Lewis, Roger

    2012-01-01

    This article critically examines the clinical utility of redesigning a nursing practice model within the Intensive Support and Intervention Service, a new low secure mental health facility in the United Kingdom. Specifically, the "team nursing" approach to care delivery has been adapted to consist of multidisciplinary team leaders as opposed to nursing team leaders. The authors describe the role, properties, and functions of the multidisciplinary team leader approach. The authors provide examples of the benefits and challenges posed to date and the ways in which potential barriers have been overcome. Nursing care leadership can be provided by multidisciplinary staff. An adapted model of team nursing can be implemented in a low secure setting. © 2011 Wiley Periodicals, Inc.

  15. Research on Evaluation of Conservation Planning Implementation of Nanshe Historic Village in Dongguan City

    Science.gov (United States)

    Yubin, Luo

    2017-10-01

    Conservation planning plays an important role in the protection and development of historic villages. The evaluation of conservation planning is helpful to find out the problems existing in the village protection work which helps to improve the conservation planning system. The paper briefly summarizes the conservation planning background of Nanshe historic village in Dongguan city, Guangdong province, China. The conservation planning guided the protection work of Nanshe village since 2002. It evaluates four aspects of the conservation planning implementation and effect such as protection and utilization of the ancient buildings, roadway repair, landscape and basic sanitation facilities improvement by ways of field research and questionnaire survey. There are only nineteen ancient buildings repaired and the rest of them are part of repaired or not repaired. Most of the roadways are well preserved. Only four of them are partly repaired or not repaired. Most of the villagers like to chat under the ancient banyan trees. Conservation Planning pays not much attention to the needs of the residents. Although conservation planning of Nanshe village developed the near, middle and long term target it actually took 14 years to carry out the near target. It enhances the social awareness of Nanshe village and the sense of belongings of the villagers. Most of the villagers are satisfied with the implementation of the conservation planning. Meanwhile, the paper exposes the conservation planning is too idealistic. It lacks of implementation details and the three phases of the investment funds and pays not much attention to the needs of residents.

  16. Decentralized Formation Flying Control in a Multiple-Team Hierarchy

    Science.gov (United States)

    Mueller, Joseph .; Thomas, Stephanie J.

    2005-01-01

    This paper presents the prototype of a system that addresses these objectives-a decentralized guidance and control system that is distributed across spacecraft using a multiple-team framework. The objective is to divide large clusters into teams of manageable size, so that the communication and computational demands driven by N decentralized units are related to the number of satellites in a team rather than the entire cluster. The system is designed to provide a high-level of autonomy, to support clusters with large numbers of satellites, to enable the number of spacecraft in the cluster to change post-launch, and to provide for on-orbit software modification. The distributed guidance and control system will be implemented in an object-oriented style using MANTA (Messaging Architecture for Networking and Threaded Applications). In this architecture, tasks may be remotely added, removed or replaced post-launch to increase mission flexibility and robustness. This built-in adaptability will allow software modifications to be made on-orbit in a robust manner. The prototype system, which is implemented in MATLAB, emulates the object-oriented and message-passing features of the MANTA software. In this paper, the multiple-team organization of the cluster is described, and the modular software architecture is presented. The relative dynamics in eccentric reference orbits is reviewed, and families of periodic, relative trajectories are identified, expressed as sets of static geometric parameters. The guidance law design is presented, and an example reconfiguration scenario is used to illustrate the distributed process of assigning geometric goals to the cluster. Next, a decentralized maneuver planning approach is presented that utilizes linear-programming methods to enact reconfiguration and coarse formation keeping maneuvers. Finally, a method for performing online collision avoidance is discussed, and an example is provided to gauge its performance.

  17. Head and neck multidisciplinary team meetings: Effect on patient management.

    Science.gov (United States)

    Brunner, Markus; Gore, Sinclair M; Read, Rebecca L; Alexander, Ashlin; Mehta, Ankur; Elliot, Michael; Milross, Chris; Boyer, Michael; Clark, Jonathan R

    2015-07-01

    The purpose of this study was for us to present our findings on the prospectively audited impact of head and neck multidisciplinary team meetings on patient management. We collected clinical data, the pre-multidisciplinary team meeting treatment plan, the post-multidisciplinary team meeting treatment plans, and follow-up data from all patients discussed at a weekly multidisciplinary team meeting and we recorded the changes in management. One hundred seventy-two patients were discussed in 39 meetings. In 52 patients (30%), changes in management were documented of which 20 (67%) were major. Changes were statistically more likely when the referring physician was a medical or radiation oncologist, when the initial treatment plan did not include surgery, and when the histology was neither mucosal squamous cell cancer nor a skin malignancy. Compliance to the multidisciplinary team meeting treatment recommendation was 84% for all patients and 70% for patients with changes in their treatment recommendation. Head and neck multidisciplinary team meetings changed management in almost a third of the cases. © 2014 Wiley Periodicals, Inc.

  18. "Part of the Team": Mapping the outcomes of training patients for new roles in health research and planning.

    Science.gov (United States)

    Shklarov, Svetlana; Marshall, Deborah A; Wasylak, Tracy; Marlett, Nancy J

    2017-12-01

    A patient research internship (Patient and Community Engagement Research program-PaCER) was created to support a provincial commitment by Alberta Health Services' Strategic Clinical Networks ™ to find new ways to engage patients in a new interdisciplinary organization to support evidence-informed improvements in clinical outcomes across the health system. Implement and test a new research method and training curriculum to build patient capacity for engagement in health through peer-to-peer research. Programme evaluation using Outcome Mapping and the grounded theory method. Twenty-one patients with various chronic conditions completed one year of training in adapted qualitative research methods, including an internship where they designed and conducted five peer-to-peer inquiries into a range of health experiences. Outcomes were continually monitored and evaluated using an Outcome Mapping framework, in combination with grounded theory analysis, based on data from focus groups, observation, documentation review and semi-structured interviews (21 patient researchers, 15 professional collaborators). Key stakeholders indicated the increased capacity of patients to engage in health-care research and planning, and the introduction and acceptance of new, collaborative roles for patients in health research. The uptake of new patient roles in health-care planning began to impact attitudes and practices. Patient researchers become "part of the team" through cultural and relationship changes that occur in two convergent directions: (i) building the capacity of patients to engage confidently in a dialogue with clinicians and decision makers, and (ii) increasing the readiness for patient engagement uptake within targeted organizations. © 2017 The Authors Health Expectations Published by John Wiley & Sons Ltd.

  19. Implementation of the U.S. utility industry's TEAM-UP commercialization initiative

    International Nuclear Information System (INIS)

    Bergman, M.; Bigger, J.; Hester, S.; Serfass, J.; Hoffner, J.

    1994-01-01

    TEAM-UP is a partnership program of the US electric utility industry and the US Department of Energy to help develop utility PV markets. TEAM-UP is a utility-directed program to significantly increase utility PV experience by promoting installations of utility PV systems. Two primary program areas are proposed for TEAM-UP; (1) Grid-Independent Applications (GIA) -- an initiative to aggregate utility purchases of small-scale, grid-independent applications, and (2) Grid-Connected Applications -- an initiative to identify and competitively award cost-sharing contracts for grid-connected PV systems with high market growth potential, or collective purchase programs involving multiple buyers. This paper describes these programs and outlines the schedule, the procurement status, and the results of surveys, public review workshops, and notices that are part of the TEAM-UP process

  20. Energy Efficiency/Renewable Energy Programs in State Implementation Plans - Guidance Documents

    Science.gov (United States)

    final document that provides guidance to States and local areas on quantifying and including emission reductions from energy efficiency and renewable energy measures in State Implementation Plans (SIPS).

  1. Planning support concept to implementation of sustainable parking development projects in ancient Mediterranean cities

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2014-12-01

    Full Text Available This paper proposes a planning support concept (PSC to implementation of sustainable parking development projects (SPDP in ancient Mediterranean cities. It is conceptualized by the logic of decision support systems and a multicriteria analysis approach. The purpose of the concept is to support setting of implementation priorities for subprojects (construction of new and/or improvement of existing parking within a SPDP. Analysing the existing and a planned state of parking within the city a goal tree is established. Subprojects are defined accordingly. Objectives from the last hierarchy level within the goal tree are used as criteria for assessment of defined subprojects. Representatives of stakeholders provided criteria weights by application of AHP and SAW methods. PROMETHEE II was used for priority ranking and PROMETHEE V ensured a definition of project’s implementation phases. The result of the presented concept is the implementation plan for such projects. The concept is tested on the city of Trogir.

  2. Integrated Transdisciplinary Teams.

    Science.gov (United States)

    Gallivan-Fenlon, Amanda

    1994-01-01

    This article reviews the use of transdisciplinary teaming and integrated therapy for young children with multiple disabilities. It presents examples and suggestions for implementation, in the areas of flexibility, Individualized Education Program development, and parent participation. (JDD)

  3. SRS ES and H Standards Compliance Program Implementation Plan

    International Nuclear Information System (INIS)

    Hearn, W.H.

    1993-01-01

    On March 8, 1990, the Defense Nuclear Facilities Safety Board (DNFSB) issued Recommendation 90-2 to the Secretary of Energy. This recommendation, based upon the DNFSB's initial review and evaluation of the content and implementation of standards relating to the design, construction, operations, and decommissioning of defense nuclear facilities of the U.S. Department of Energy (DOE), called for three actions: identification of specific standards that apply to design, construction, operation and decommissioning of DOE facilities; assessment of the adequacy of those standards for protecting public health and safety; and determination of the extent to which they have and are being implemented. The purpose of this Implementation Plan is to define the single program for all sitewide and facility 90-2 ES and H Standards Compliance efforts, which will satisfy the HQ Implementation Plan, avoid duplicate efforts, be as simple and achievable as possible, include cost-saving innovations, use a graded approach based on facility hazards and future needs of facilities, and support configuration control for facility requirements. The Defense Waste Processing Facility (DWPF) has been designated a pilot facility for the 90-2 program and has progressed with their facility program ahead of the site-level program. The DWPF, and other Government-Owned Contractor-Operated (GOCO) facilities that progress on an enhanced schedule, will serve as pilot facilities for the site-level program. The lessons learned with their requirement identifications, and their assessments of the adequacy of and their compliance with these requirements will be used to improve the efficiency of the site-level and subsequent programs

  4. Planning new basic guideline to the radiological risk. Content, radiological criteria and implementation

    International Nuclear Information System (INIS)

    Calvin Cuartero, M.; Vega Riber, R. de la; Martin Calvarro, J. M.

    2011-01-01

    The most important aspects of the Basic Guideline focus on their area of planning, groups of potential radiological emergencies in the type of activity associated with the levels of response planning and responsible organizations, structure and functions for each level, radiological criteria, implementation and maintenance of the effectiveness of the level of response plans abroad.

  5. Manpower development - planning and implementation

    International Nuclear Information System (INIS)

    Scholten, V.W.

    1978-01-01

    The demands of a nuclear technology programme on the manpower resources of a developing country are very onerous. Unlike other industries, as well as the planning and operating staff, nuclear technology requires an additional administrative infrastructure to regulate the various activities. To minimize the effect of manpower shortage, the planning and development of manpower resources need to be carried out on a national scale. To introduce a nuclear programme, a special preparatory phase is required. During this phase the special conditions appertaining to the country are first considered, as are the evaluation and then the promotional aspects of the programme. In a second phase, all the partners involved in the implementation are considered, with reference to their roles and interrelationships. Their various tasks and obligations are fully assessed. This is a wide-ranging study covering, in addition to the construction of a nuclear power plant, the industrial collaboration and licensing agreements, and the utility operational training schemes. Finally, the third phase considers the different and necessary educational requirements, and the existent and developed level of the manpower, with respect to the scope and content of the know-how transfer. When all the relevant aspects have been considered, the expansion of the universities and educational establishments must be carried out. This whole phase needs to be started as early as possible because it involves a period of some years. (author)

  6. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka Shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2007-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal and spent nuclear fuel assemblies; treatment/decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  7. Implementation of the environmental management plan for the dismantling of nuclear powered submarines at Zvezdochka shipyard, Russia

    International Nuclear Information System (INIS)

    Washer, M.; Cull, M.; Crocker, C.; Ivanov, V.; Shepurev, A.; Khan, B.U.Z.; Lee, M.; Gerchikov, M.

    2008-01-01

    Department of Foreign Affairs and International Trade Canada is funding the dismantling of twelve nuclear powered submarines (NPS) from the Russian Federation's Northern Fleet as part of the Global Partnership Initiative against weapons and materials of mass destruction. In this paper, work performed by Nuclear Safety Solutions Ltd. and its collaborators in support of these activities is described. First, an environmental impact assessment of towing and dismantling NPS in the Kola Peninsula, and the Barents and White Seas was performed. The assessed activities included: towing of NPS from Naval Bases in Murmansk Region to the Zvezdochka shipyard (Severodvinsk); defuelling of onboard reactors; dismantling of NPS at Zvezdochka; and waste management. The assessment helped identify mitigation measures that could prevent the occurrence of adverse effects. Next, the project team defined and implemented an environmental management plan (EMP) based on the shipyard's existing environmental policy and the mitigating measures identified during the environmental assessment. Specific targets were defined to track the progress of the EMP implementation, and are described in this paper. During the study period, three Victor Class NPS were dismantled at Zvezdochka. The major benefits realized include: removal of spent nuclear fuel assemblies; treatment/ decontamination of liquid and solid radioactive waste; and the cultivation of collaboration between Russian and Western expertise. (author)

  8. Mission Operations Planning and Scheduling System (MOPSS)

    Science.gov (United States)

    Wood, Terri; Hempel, Paul

    2011-01-01

    MOPSS is a generic framework that can be configured on the fly to support a wide range of planning and scheduling applications. It is currently used to support seven missions at Goddard Space Flight Center (GSFC) in roles that include science planning, mission planning, and real-time control. Prior to MOPSS, each spacecraft project built its own planning and scheduling capability to plan satellite activities and communications and to create the commands to be uplinked to the spacecraft. This approach required creating a data repository for storing planning and scheduling information, building user interfaces to display data, generating needed scheduling algorithms, and implementing customized external interfaces. Complex scheduling problems that involved reacting to multiple variable situations were analyzed manually. Operators then used the results to add commands to the schedule. Each architecture was unique to specific satellite requirements. MOPSS is an expert system that automates mission operations and frees the flight operations team to concentrate on critical activities. It is easily reconfigured by the flight operations team as the mission evolves. The heart of the system is a custom object-oriented data layer mapped onto an Oracle relational database. The combination of these two technologies allows a user or system engineer to capture any type of scheduling or planning data in the system's generic data storage via a GUI.

  9. Maintenance implementation plan for the B Plant/WESF. Revision 4

    International Nuclear Information System (INIS)

    Tritt, S.E.; Lueck, B.H.

    1996-01-01

    This Maintenance Implementation Plan (MIP) has been developed for maintenance functions associated with the B Plant/WESF (Waste Encapsulation Storage Facility) complex. The objective of this plan is to provide baseline information for establishing and identifying WHC conformance programs and policies applicable to implementation of DOE order 4330.4B guidelines. In addition, this maintenance plan identifies the actions necessary to develop a cost-effective and efficient maintenance program at B Plant/WESF. The B Plant WESF facility complex consists of three main facilities and several support structures located in the 200 East Area of the Hanford site. B Plant is a transition facility that is required to ensure safe storage and management of WESF (operating facility) cesium and strontium capsules. B Plant/WESF also contains substantial radiological inventory from previous campaigns. There are no production activities at B Plant, but several of its operating systems are required to accomplish the current B Plant/WESF mission. B Plant/WESF are each considered a nuclear facility due to the storage of cesium and strontium capsules at WESF and the large radiological inventory from past processing

  10. WHC natural phenomena hazards mitigation implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    Conrads, T.J.

    1996-09-11

    Natural phenomena hazards (NPH) are unexpected acts of nature which pose a threat or danger to workers, the public or to the environment. Earthquakes, extreme winds (hurricane and tornado),snow, flooding, volcanic ashfall, and lightning strike are examples of NPH at Hanford. It is the policy of U.S. Department of Energy (DOE) to design, construct and operate DOE facilitiesso that workers, the public and the environment are protected from NPH and other hazards. During 1993 DOE, Richland Operations Office (RL) transmitted DOE Order 5480.28, ``Natural Phenomena Hazards Mitigation,`` to Westinghouse Hanford COmpany (WHC) for compliance. The Order includes rigorous new NPH criteria for the design of new DOE facilities as well as for the evaluation and upgrade of existing DOE facilities. In 1995 DOE issued Order 420.1, ``Facility Safety`` which contains the same NPH requirements and invokes the same applicable standards as Order 5480.28. It will supersede Order 5480.28 when an in-force date for Order 420.1 is established through contract revision. Activities will be planned and accomplished in four phases: Mobilization; Prioritization; Evaluation; and Upgrade. The basis for the graded approach is the designation of facilities/structures into one of five performance categories based upon safety function, mission and cost. This Implementation Plan develops the program for the Prioritization Phase, as well as an overall strategy for the implemention of DOE Order 5480.2B.

  11. 76 FR 55621 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2011-09-08

    ... California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY: Environmental...-Solano Air Quality Management District portion of the California State Implementation Plan (SIP). This... the following local rule: Yolo-Solano Air Quality Management District Rule 2.41, Expandable...

  12. 327 Building fire hazards analysis implementation plan

    International Nuclear Information System (INIS)

    Eggen, C.D.

    1998-01-01

    In March 1998, the 327 Building Fire Hazards Analysis (FRA) (Reference 1) was approved by the US Department of Energy, Richland Operations Office (DOE-RL) for implementation by B and W Hanford Company (B and WHC). The purpose of the FHA was to identify gaps in compliance with DOE Order 5480.7A (Reference 2) and Richland Operations Office Implementation Directive (RLID) 5480.7 (Reference 3), especially in regard to loss limitation. The FHA identified compliance gaps in five areas and provided nine recommendations (11 items) to bring the 327 Building into compliance. To date, actions for five of the 11 items have been completed. Exemption requests will be transmitted to DOE-RL for two of the items. Corrective actions have been identified for the remaining four items. The completed actions address combustible loading requirements associated with the operation of the cells and support areas. The status of the recommendations and actions was confirmed during the July 1998 Fire Protection Assessment. B and WHC will use this Implementation Plan to bring the 327 Building and its operation into compliance with DOE Order 5480.7A and RLID 5480.7

  13. How School Principals Can Foster Effective Literacy Instruction: A Ten-Step Plan

    Science.gov (United States)

    Hinchman, Kathleen A.

    2009-01-01

    School principals can foster effective literacy instruction by orchestrating community collaboration in an ongoing cycle of literacy program development, implementation, evaluation, and revision outlined in this ten-step plan. The steps address forming a community advisory board, appointing a building literacy leader, forming a literacy team,…

  14. Educational program in crisis management for cardiac surgery teams including high realism simulation.

    Science.gov (United States)

    Stevens, Louis-Mathieu; Cooper, Jeffrey B; Raemer, Daniel B; Schneider, Robert C; Frankel, Allan S; Berry, William R; Agnihotri, Arvind K

    2012-07-01

    Cardiac surgery demands effective teamwork for safe, high-quality care. The objective of this pilot study was to develop a comprehensive program to sharpen performance of experienced cardiac surgical teams in acute crisis management. We developed and implemented an educational program for cardiac surgery based on high realism acute crisis simulation scenarios and interactive whole-unit workshop. The impact of these interventions was assessed with postintervention questionnaires, preintervention and 6-month postintervention surveys, and structured interviews. The realism of the acute crisis simulation scenarios gradually improved; most participants rated both the simulation and whole-unit workshop as very good or excellent. Repeat simulation training was recommended every 6 to 12 months by 82% of the participants. Participants of the interactive workshop identified 2 areas of highest priority: encouraging speaking up about critical information and interprofessional information sharing. They also stressed the importance of briefings, early communication of surgical plan, knowing members of the team, and continued simulation for practice. The pre/post survey response rates were 70% (55/79) and 66% (52/79), respectively. The concept of working as a team improved between surveys (P = .028), with a trend for improvement in gaining common understanding of the plan before a procedure (P = .075) and appropriate resolution of disagreements (P = .092). Interviewees reported that the training had a positive effect on their personal behaviors and patient care, including speaking up more readily and communicating more clearly. Comprehensive team training using simulation and a whole-unit interactive workshop can be successfully deployed for experienced cardiac surgery teams with demonstrable benefits in participant's perception of team performance. Copyright © 2012 The American Association for Thoracic Surgery. Published by Mosby, Inc. All rights reserved.

  15. Towards heterogeneous robot team path planning: acquisition of multiple routes with a modified spline-based algorithm

    Directory of Open Access Journals (Sweden)

    Lavrenov Roman

    2017-01-01

    Full Text Available Our research focuses on operation of a heterogeneous robotic group that carries out point-to point navigation in GPS-denied dynamic environment, applying a combined local and global planning approach. In this paper, we introduce a homotopy-based high-level planner, which uses a modified splinebased path-planning algorithm. The algorithm utilizes Voronoi graph for global planning and a set of optimization criteria for local improvements of selected paths. The simulation was implemented in Matlab environment.

  16. Can hospital audit teams identify case management problems, analyse their causes, identify and implement improvements? A cross-sectional process evaluation of obstetric near-miss case reviews in Benin

    Science.gov (United States)

    2012-01-01

    Background Obstetric near-miss case reviews are being promoted as a quality assurance intervention suitable for hospitals in low income countries. We introduced such reviews in five district, regional and national hospitals in Benin, West Africa. In a cross-sectional study we analysed the extent to which the hospital audit teams were able to identify case management problems (CMPs), analyse their causes, agree on solutions and put these solutions into practice. Methods We analysed case summaries, women’s interview transcripts and audit minutes produced by the audit teams for 67 meetings concerning one woman with near-miss complications each. We compared the proportion of CMPs identified by an external assessment team to the number found by the audit teams. For the latter, we described the CMP causes identified, solutions proposed and implemented by the audit teams. Results Audit meetings were conducted regularly and were well attended. Audit teams identified half of the 714 CMPs; they were more likely to find managerial ones (71%) than the ones relating to treatment (30%). Most identified CMPs were valid. Almost all causes of CMPs were plausible, but often too superficial to be of great value for directing remedial action. Audit teams suggested solutions, most of them promising ones, for 38% of the CMPs they had identified, but recorded their implementation only for a minority (8.5%). Conclusions The importance of following-up and documenting the implementation of solutions should be stressed in future audit interventions. Tools facilitating the follow-up should be made available. Near-miss case reviews hold promise, but their effectiveness to improve the quality of care sustainably and on a large scale still needs to be established. PMID:23057707

  17. Perceived Use and Acceptance of Cloud Enterprise Resource Planning (ERP) Implementation in the Manufacturing Industries

    Science.gov (United States)

    Adeboje, Adewale

    2015-01-01

    The purpose of this study was to gain an insight into perceived use and acceptance for implementing an enterprise resource planning system and the decision whether to contract out the enterprise resource planning (ERP) service to a cloud provider. Cloud-based ERP systems can provide many advantages to the normal implementation of the same systems…

  18. Team health, an assessment approach to engage first year students in cross-cultural and cross-discipline teams towards more effective team-working

    Directory of Open Access Journals (Sweden)

    Kathy Egea

    Full Text Available Specialists who work in a globalised environment, need to work in teams, if they are to be continuously effective. The challenge for IT educators is to design and implement inter-cultural teamwork practices into their curriculum. Investigating this challenge, this case study describes Team Health, an assessment approach designed to skill students to be more effective in team working in cross-cultural and cross-discipline teams. The educational context is teamwork practice within a first year introductory web design course. Framed by Saunders\\'s virtual team lifecycle model (relationship building and team processes and Hofstede\\'s cultural dimensions (communication and working cross-culturally, the assessment approach utilises reflective and iterative strategies to support team working. At three points in the semester, students complete a survey on these four concepts, identify team strengths and weaknesses from the results of the surveys and work towards addressing one team weakness. The final assessment activity requires students to reflect on team working for the semester. Key attributes for effective team working are identified from the three surveys and the final reflective summaries. This paper compares course outcomes such as team cohesion and student grades to the previous course offering and shows that with the introduction of Team Health, the more complex student cohorts under this study achieve equally well. It is concluded that the guided reflective practices underpinning Team Health can prepare students for first year approaches to teamwork, and thereby provide starting points for working in future global teams where members are both culturally diverse and from different discipline areas.

  19. 76 FR 47094 - Revisions to the California State Implementation Plan; South Coast Air Quality Management District

    Science.gov (United States)

    2011-08-04

    ... the California State Implementation Plan; South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... following local rule: South Coast Air Quality Management District Rule 1175, Control of Emissions from the...

  20. 76 FR 72142 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2011-11-22

    ... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...

  1. Standard Review Plan Update and Development Program. Implementing Procedures Document

    Energy Technology Data Exchange (ETDEWEB)

    1992-05-01

    This implementing procedures document (IPD) was prepared for use in implementing tasks under the standard review plan update and development program (SRP-UDP). The IPD provides comprehensive guidance and detailed procedures for SRP-UDP tasks. The IPD is mandatory for contractors performing work for the SRP-UDP. It is guidance for the staff. At the completion of the SRP-UDP, the IPD will be revised (to remove the UDP aspects) and will replace NRR Office Letter No. 800 as long-term maintenance procedures.

  2. Implementing PlanCheyenne: Strategies and Opportunities for Smarter Growth in Cheyenne

    Science.gov (United States)

    This report is from a technical assistance project with Cheyenne, WY, to identify policy options that would implement PlanCheyenne and illustrate development that would help to achieve the community's goals.

  3. A season-long team-building intervention: examining the effect of team goal setting on cohesion.

    Science.gov (United States)

    Senécal, Julie; Loughead, Todd M; Bloom, Gordon A

    2008-04-01

    The purpose of the current study was to determine whether the implementation of a season-long team-building intervention program using team goal setting increased perceptions of cohesion. The participants were 86 female high school basketball players from 8 teams. The teams were randomly assigned to either an experimental team goal-setting or control condition. Each participant completed the Group Environment Questionnaire (GEQ; Carron, Brawley, & Widmeyer, 2002; Carron, Widmeyer, & Brawley, 1985), which assessed cohesion at both the beginning and end of the season. Overall, the results revealed a significant multivariate effect, Pillai's trace F(12, 438) = 2.68, p = .002. Post hoc analyses showed that at the beginning of the season, athletes from both conditions did not differ in their perceptions of cohesion. However, at the end of the season, athletes in the team goal-setting condition held higher perceptions of cohesion than athletes in the control condition. Overall, the results indicated that team goal setting was an effective team-building tool for influencing cohesiveness in sport teams.

  4. Implementation plan for HANDI 2000 TWRS master equipment list

    International Nuclear Information System (INIS)

    BENNION, S.I.

    1999-01-01

    This document presents the implementation plan for an additional deliverable of the HANDI 2000 Project. The PassPort Equipment Data module processes include those portions of the COTS PassPort system required to support tracking and management of the Master Equipment List for Lockheed Martin Hanford Company (LMHC) and custom software created to work with the COTS products

  5. Sandia National Laboratories Advanced Simulation and Computing (ASC) software quality plan : ASC software quality engineering practices Version 3.0.

    Energy Technology Data Exchange (ETDEWEB)

    Turgeon, Jennifer L.; Minana, Molly A.; Hackney, Patricia; Pilch, Martin M.

    2009-01-01

    The purpose of the Sandia National Laboratories (SNL) Advanced Simulation and Computing (ASC) Software Quality Plan is to clearly identify the practices that are the basis for continually improving the quality of ASC software products. Quality is defined in the US Department of Energy/National Nuclear Security Agency (DOE/NNSA) Quality Criteria, Revision 10 (QC-1) as 'conformance to customer requirements and expectations'. This quality plan defines the SNL ASC Program software quality engineering (SQE) practices and provides a mapping of these practices to the SNL Corporate Process Requirement (CPR) 001.3.6; 'Corporate Software Engineering Excellence'. This plan also identifies ASC management's and the software project teams responsibilities in implementing the software quality practices and in assessing progress towards achieving their software quality goals. This SNL ASC Software Quality Plan establishes the signatories commitments to improving software products by applying cost-effective SQE practices. This plan enumerates the SQE practices that comprise the development of SNL ASC's software products and explains the project teams opportunities for tailoring and implementing the practices.

  6. 77 FR 23193 - Revisions to the California State Implementation Plan, Yolo-Solano Air Quality Management District

    Science.gov (United States)

    2012-04-18

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0180; FRL-9652-3] Revisions to the California State Implementation Plan, Yolo- Solano Air Quality Management District AGENCY... the Yolo-Solano Air Quality Management District portion of the California State Implementation Plan...

  7. 75 FR 32353 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2010-06-08

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2010-0276; FRL-9139-8] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  8. 77 FR 32483 - Revisions to the California State Implementation Plan, South Coast Air Quality Management District

    Science.gov (United States)

    2012-06-01

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R09-OAR-2012-0236; FRL-9670-9] Revisions to the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan...

  9. 77 FR 12524 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality...

    Science.gov (United States)

    2012-03-01

    ... Promulgation of Air Quality Implementation Plans; Indiana; Lead Ambient Air Quality Standards AGENCY... Indiana State Implementation Plan (SIP) for lead (Pb) under the Clean Air Act (CAA). This submittal incorporates the National Ambient Air Quality Standards (NAAQS) for Pb promulgated by EPA in 2008. DATES...

  10. 75 FR 65594 - Approval and Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality...

    Science.gov (United States)

    2010-10-26

    ... Promulgation of Air Quality Implementation Plans; Ohio; Ohio Ambient Air Quality Standards AGENCY... the Ohio Administrative Code (OAC) relating to the consolidation of Ohio's Ambient Air Quality Standards (AAQS) into Ohio's State Implementation Plan (SIP) under the Clean Air Act. On April 8, 2009, and...

  11. 76 FR 13511 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... approve revisions to the Virginia State Implementation Plan (SIP). The revisions recodify the open burning... approving these revisions to Virginia's open burning regulations in accordance with the requirements of the...

  12. 76 FR 55541 - Approval and Promulgation of Air Quality Implementation Plans; West Virginia: Kentucky; Ohio...

    Science.gov (United States)

    2011-09-07

    ... Cabell and Wayne Counties in their entireties and a portion of Mason County (Graham Tax District) in West... reasonable further progress (RFP) plan, contingency measures, and other planning State Implementation Plan... Regulatory Development Section, Air Planning Branch, Air, Pesticides and Toxics Management Division, U.S...

  13. Preparation, review, and approval of implementation plans for nuclear safety requirements

    International Nuclear Information System (INIS)

    1994-10-01

    This standard describes an acceptable method to prepare, review, and approve implementation plans for DOE Nuclear Safety requirements. DOE requirements are identified in DOE Rules, Orders, Notices, Immediate Action Directives, and Manuals

  14. The strategy of the shelter implementation plan (SIP) performance

    International Nuclear Information System (INIS)

    Geras'ko, V.N.; Nosovskij, A.V.

    1999-01-01

    In 1997 the 'Shelter Implementation Plan' (SIP) was developed it's purpose was to transform Unit 4 of the Chernobyl NPP into the ecologically safe system. The Plan was developed by common efforts of the Ukrainian scientists, CES representatives and experts from the United States of America. The fact that there are no nuclear and radiation safety criteria for the projects will result into the situation when different designers might use within the various project tasks various design criteria. Till now o exact date for the constructions stabilization activities has been defined, and it creates a kind of on definiteness while developing the Radioactive Waste Management strategy and Safe Confinement

  15. Energy and nuclear power planning study for Algeria

    International Nuclear Information System (INIS)

    1985-01-01

    This study, conducted jointly by a team of engineers and economists from the Sonelgaz company and the IAEA, had three objectives: (1) To perform a preliminary economic study aimed at initiating thinking on the role that nuclear power could play in Algeria's long-term energy structure and to suggest reasonable hypotheses on what share of the energy market nuclear power might supply. (2) To train a team of Algerian engineers and economists in long-term economic planning techniques. Once the team has gained a basic knowledge through this preliminary study, it will be in a position to continue the process, to perform other, more detailed independent analyses and to review the entire process should economic conditions change. (3) To introduce in Algeria the computer techniques and facilities needed to carry out such energy investment planning studies for electricity production. The main aim throughout the studies was to train a team of Algerian engineers in energy planning rather than to come to definitive conclusions on the problem of introducing nuclear power in Algeria. Two successive analyses were performed. The first consisted in evaluating the final energy requirements which will result in the medium and long term (by 2015) from the implementation of the economic development policies in the Five Year Plan (up to 1984) and in the proposals for the next decade (up to 1990) being studied by the Algerian Ministry of Planning. The second part is concerned only with the results regarding future electricity requirements, which are used as input data in studying the optimization of Algeria's future electricity generating system. Various methods of generation are analysed and included in an econometric model in order to make a sequential determination of the most economic composition of power generating capacity

  16. Evaluation of Croatian model of polycentric health planning and decision making.

    Science.gov (United States)

    Sogorić, Selma; Dzakula, Aleksandar; Rukavina, Tea Vukusić; Grozić-Zivolić, Sonja; Lazarić-Zec, Danijela; Dzono-Boban, Ankica; Brborović, Ognjen; Lang, Slobodan; Vuletić, Silvije

    2009-03-01

    To determine the progress in the development and implementation of health policies on a county level resulting from the learning-by-doing training provided through the County Public Health Capacity Building Program started in 2001 in Croatia. Modular training using management tools, public health theory and practice, and SMDP's Healthy Plan-it tool, followed by the self-evaluation of the progress made by county teams in health needs assessment and health policy development, implementation, and assurance. Fifteen county teams consisting of politicians, executive officers, public health professionals, and community members. Twelve of 15 county teams completed the program. The teams made progress in the evaluated areas, although to a different extent, which did not depend on the amount of time they had or the governance experience. The differences in improvement depended on the differences in the strength of political, executive, and professional components of the teams. Teams with a strong political and/or executive component, but weak public health professional and community components made major improvements in policy development and/or assurance function, but performed less well in the health needs assessment and constituency building. The reversed was also true. Learning-by-doing training program improved public health practices on a county level in Croatia.

  17. Facilitating the implementation of the American College of Surgeons/Association of Program Directors in Surgery phase III skills curriculum: training faculty in the assessment of team skills.

    Science.gov (United States)

    Hull, Louise; Arora, Sonal; Stefanidis, Dimitrios; Sevdalis, Nick

    2015-11-01

    Effective teamwork is critical to safety in the operating room; however, implementation of phase III of the American College of Surgeons (ACS) and Association of Program Directors in Surgery (APDS) Curriculum that focuses on team-based skills remains worryingly low. Training and assessing the complexities of teamwork is challenging. The objective of this study was to establish guidelines and recommendations for training faculty in assessing/debriefing team skills. A multistage survey-based consensus study was completed by 108 experts responsible for training and assessing surgical residents from the ACS Accredited Educational Institutes. Experts agreed that a program to teach faculty to assess team-based skills should include training in the recognition of teamwork skills, practice rating these skills, and training in the provision of feedback/debriefing. Agreement was reached that faculty responsible for conducting team-based skills assessment should be revalidated every 2 years and stringent proficiency criteria should be met. Faculty development is critical to ensure high-quality, standardized training and assessment. Training faculty to assess team-based skills has the potential to facilitate the effective implementation of phase III of the ACS and APDS Curriculum. Copyright © 2015 Elsevier Inc. All rights reserved.

  18. [Planning by service organisation priorities. The process of preparing strategic service-organisation plans].

    Science.gov (United States)

    Sampietro-Colom, Laura; Costa, Dolors; Busqué, Anna; Lacasa, Carme

    2008-12-01

    Strategic planning designs the general setting and the strategic principles of a healthcare system, as well as the general guidelines that govern the development of a health system. Strategic service-organisation plans deal with translating healthcare policies into service policies and respond, principally, to the need for services; these give rise to problems that require a solution. They are developed in line with advances in scientific knowledge, the implementation and current characteristics of the healthcare services and the evolution in the competences of professional teams. There are five stages for their development: identification of health/service requirements; prioritisation of needs in health/services; definition of and agreement on service organisation models (care model and service portfolio); the preparation of and agreement on territorial action plans; introduction and evaluation. A conceptual framework is presented along with practical applications carried out in Catalonia.

  19. Tiger Team assessment of the Lawrence Berkeley Laboratory, Washington, DC

    Energy Technology Data Exchange (ETDEWEB)

    1991-02-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES H awareness at all staff levels and in identifying ES H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and oversight by DOE of ES H activities at LBL. As a result of these deficiencies, the Tiger Team has reservations about LBL's ability to implement effective actions in a timely manner and, thereby, achieve excellence in their ES H program. 4 figs., 24 tabs.

  20. Tiger Team assessment of the Lawrence Berkeley Laboratory, Washington, DC

    International Nuclear Information System (INIS)

    1991-02-01

    This report documents the results of the Department of Energy's (DOE's) Tiger Team Assessment of the Lawrence Berkeley Laboratory (LBL) conducted from January 14 through February 15, 1991. The purpose of the assessment was to provide the Secretary of Energy with the status of environment, safety, and health (ES ampersand H) programs at LBL. The Tiger Team concluded that curtailment of cessation of any operations at LBL is not warranted. However, the number and breadth of findings and concerns from this assessment reflect a serious condition at this site. In spite of its late start, LBL has recently made progress in increasing ES ampersand H awareness at all staff levels and in identifying ES ampersand H deficiencies. Corrective action plans are inadequate, however, many compensatory actions are underway. Also, LBL does not have the technical expertise or training programs nor the tracking and followup to effectively direct and control sitewide guidance and oversight by DOE of ES ampersand H activities at LBL. As a result of these deficiencies, the Tiger Team has reservations about LBL's ability to implement effective actions in a timely manner and, thereby, achieve excellence in their ES ampersand H program. 4 figs., 24 tabs

  1. I and C security audit of nuclear facilities: implementation guide - TAFICS/IG/3

    International Nuclear Information System (INIS)

    2017-05-01

    This document provides guidance to I and C Security audit team to prepare, plan, and execute security audit of Instrumentation and Control (I and C) systems at DAE's nuclear facilities, including I and C system development and manufacturing organisations. The audit is expected to check efficacy of I and C security program - plan, policies, procedures and controls - implemented at a nuclear facility to protect I and C systems from potential cyber attacks. The document contains detailed audit procedures, which specify the audit objectives, audit objects and audit methods for each element of I and C security described in implementation guides promulgated by TAFICS to all DAE Units. (author)

  2. Planning to break unwanted habits: habit strength moderates implementation intention effects on behaviour change.

    Science.gov (United States)

    Webb, Thomas L; Sheeran, Paschal; Luszczynska, Aleksandra

    2009-09-01

    Implementation intention formation promotes effective goal striving and goal attainment. However, little research has investigated whether implementation intentions promote behaviour change when people possess strong antagonistic habits. Experiment 1 developed relatively habitual responses that, after a task switch, had a detrimental impact on task performance. Forming an if-then plan reduced the negative impact of habit on performance. However, the effect of forming implementation intentions was smaller among participants who possessed strong habits as compared to participants who had weaker habits. Experiment 2 provided a field test of the role of habit strength in moderating the relationship between implementation intentions and behaviour in the context of smoking. Implementation intentions reduced smoking among participants with weak or moderate smoking habits, but not among participants with strong smoking habits. In summary, habit strength moderates the effectiveness of if-then plan formation in breaking unwanted habits.

  3. Communication - An Effective Tool for Implementing ISO 14001/EMS

    Energy Technology Data Exchange (ETDEWEB)

    Rachel Damewood; Bowen Huntsman

    2004-04-01

    The Idaho National Engineering and Environmental Laboratory (INEEL) received ISO 14001/EMS certification in June 2002. Communication played an effective role in implementing ISO 14001/EMS at the INEEL. This paper describes communication strategies used during the implementation and certification processes. The INEEL achieved Integrated Safety Management System (ISMS) and Voluntary Protection Program (VPP) Star status in 2001. ISMS implemented a formal process to plan and execute work. VPP facilitated worker involvement by establishing geographic units at various facilities with employee points of contact and management champions. The INEEL Environmental Management System (EMS) was developed to integrate the environmental functional area into its ISMS and VPP. Since the core functions of ISMS, VPP, and EMS are interchangeable, they were easy to integrate. Communication is essential to successfully implement an EMS. (According to ISO 14001 requirements, communication interacts with 12 other elements of the requirements.) We developed communication strategies that integrated ISMS, VPP, and EMS. For example, the ISMS, VPP, and EMS Web sites communicated messages to the work force, such as “VPP emphasizes the people side of doing business, ISMS emphasizes the system side of doing business, and EMS emphasizes the systems to protect the environment; but they all define work, identify and analyze hazards, and mitigate the hazards.” As a result of this integration, the work force supported and implemented the EMS. In addition, the INEEL established a cross-functional communication team to assist with implementing the EMS. The team included members from the Training and Communication organizations, VPP office, Pollution Prevention, Employee and Media Relations, a union representative, facility environmental support, and EMS staff. This crossfunctional team used various communication strategies to promote our EMS to all organization levels and successfully implemented EMS

  4. Process evaluation of discharge planning implementation in healthcare using normalization process theory.

    Science.gov (United States)

    Nordmark, Sofi; Zingmark, Karin; Lindberg, Inger

    2016-04-27

    Discharge planning is a care process that aims to secure the transfer of care for the patient at transition from home to the hospital and back home. Information exchange and collaboration between care providers are essential, but deficits are common. A wide range of initiatives to improve the discharge planning process have been developed and implemented for the past three decades. However, there are still high rates of reported medical errors and adverse events related to failures in the discharge planning. Using theoretical frameworks such as Normalization Process Theory (NPT) can support evaluations of complex interventions and processes in healthcare. The aim of this study was to explore the embedding and integration of the DPP from the perspective of registered nurses, district nurses and homecare organizers. The study design was explorative, using the NPT as a framework to explore the embedding and integration of the DPP. Data consisted of written documentation from; workshops with staff, registered adverse events and system failures, web based survey and individual interviews with staff. Using the NPT as a framework to explore the embedding and integration of discharge planning after 10 years in use showed that the staff had reached a consensus of opinion of what the process was (coherence) and how they evaluated the process (reflexive monitoring). However, they had not reached a consensus of opinion of who performed the process (cognitive participation) and how it was performed (collective action). This could be interpreted as the process had not become normalized in daily practice. The result shows necessity to observe the implementation of old practices to better understand the needs of new ones before developing and implementing new practices or supportive tools within healthcare to reach the aim of development and to accomplish sustainable implementation. The NPT offers a generalizable framework for analysis, which can explain and shape the

  5. Improving district level health planning and priority setting in Tanzania through implementing accountability for reasonableness framework: Perceptions of stakeholders.

    Science.gov (United States)

    Maluka, Stephen; Kamuzora, Peter; San Sebastián, Miguel; Byskov, Jens; Ndawi, Benedict; Hurtig, Anna-Karin

    2010-12-01

    In 2006, researchers and decision-makers launched a five-year project - Response to Accountable Priority Setting for Trust in Health Systems (REACT) - to improve planning and priority-setting through implementing the Accountability for Reasonableness framework in Mbarali District, Tanzania. The objective of this paper is to explore the acceptability of Accountability for Reasonableness from the perspectives of the Council Health Management Team, local government officials, health workforce and members of user boards and committees. Individual interviews were carried out with different categories of actors and stakeholders in the district. The interview guide consisted of a series of questions, asking respondents to describe their perceptions regarding each condition of the Accountability for Reasonableness framework in terms of priority setting. Interviews were analysed using thematic framework analysis. Documentary data were used to support, verify and highlight the key issues that emerged. Almost all stakeholders viewed Accountability for Reasonableness as an important and feasible approach for improving priority-setting and health service delivery in their context. However, a few aspects of Accountability for Reasonableness were seen as too difficult to implement given the socio-political conditions and traditions in Tanzania. Respondents mentioned: budget ceilings and guidelines, low level of public awareness, unreliable and untimely funding, as well as the limited capacity of the district to generate local resources as the major contextual factors that hampered the full implementation of the framework in their context. This study was one of the first assessments of the applicability of Accountability for Reasonableness in health care priority-setting in Tanzania. The analysis, overall, suggests that the Accountability for Reasonableness framework could be an important tool for improving priority-setting processes in the contexts of resource-poor settings

  6. Can hospital audit teams identify case management problems, analyse their causes, identify and implement improvements? A cross-sectional process evaluation of obstetric near-miss case reviews in Benin

    Directory of Open Access Journals (Sweden)

    Borchert Matthias

    2012-10-01

    Full Text Available Abstract Background Obstetric near-miss case reviews are being promoted as a quality assurance intervention suitable for hospitals in low income countries. We introduced such reviews in five district, regional and national hospitals in Benin, West Africa. In a cross-sectional study we analysed the extent to which the hospital audit teams were able to identify case management problems (CMPs, analyse their causes, agree on solutions and put these solutions into practice. Methods We analysed case summaries, women’s interview transcripts and audit minutes produced by the audit teams for 67 meetings concerning one woman with near-miss complications each. We compared the proportion of CMPs identified by an external assessment team to the number found by the audit teams. For the latter, we described the CMP causes identified, solutions proposed and implemented by the audit teams. Results Audit meetings were conducted regularly and were well attended. Audit teams identified half of the 714 CMPs; they were more likely to find managerial ones (71% than the ones relating to treatment (30%. Most identified CMPs were valid. Almost all causes of CMPs were plausible, but often too superficial to be of great value for directing remedial action. Audit teams suggested solutions, most of them promising ones, for 38% of the CMPs they had identified, but recorded their implementation only for a minority (8.5%. Conclusions The importance of following-up and documenting the implementation of solutions should be stressed in future audit interventions. Tools facilitating the follow-up should be made available. Near-miss case reviews hold promise, but their effectiveness to improve the quality of care sustainably and on a large scale still needs to be established.

  7. 77 FR 23622 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... approving into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure Properties LLC..., known as the eight pound per hour (8 lb/ hr) rule, for volatile organic matter, for Leisure Properties...

  8. 77 FR 23652 - Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D...

    Science.gov (United States)

    2012-04-20

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2011-0944; FRL-9648-7] Approval and Promulgation of Air Quality Implementation Plans; Illinois; Leisure Properties LLC/D/B/A Crownline Boats... proposing to approve into the Illinois State Implementation Plan (SIP) an adjusted standard for Leisure...

  9. 77 FR 42686 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year...

    Science.gov (United States)

    2012-07-20

    ... Promulgation of Air Quality Implementation Plans; Maryland; the 2002 Base Year Inventory AGENCY: Environmental... matter (PM 2.5 ) 2002 base year emissions inventory portion of the Maryland State Implementation Plan... National Ambient Air Quality Standard (NAAQS) SIP. EPA is proposing to approve the 2002 base year PM 2.5...

  10. 76 FR 13569 - Approval and Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open...

    Science.gov (United States)

    2011-03-14

    ... Promulgation of Air Quality Implementation Plans; Virginia; Revisions to the Open Burning Regulations AGENCY... Implementation Plan (SIP) revision submitted by the Commonwealth of Virginia. The revisions recodify the open... . C. Mail: EPA-R03-OAR-2010-0902, Harold A. Frankford, Air Protection Division, Mailcode 3AP00, U.S...

  11. Teacher change in implementing a research-developed representation construction pedagogy

    Science.gov (United States)

    Hubber, Peter; Chittleborough, Gail

    2016-05-01

    The Representations in Learning Science (RiLS) project developed a representation construction approach to teaching and learning in science, which has successfully demonstrated enhanced student learning through sustained engagement with ideas, and enhancement of teachers' pedagogical knowledge and understandings of how knowledge in science is developed and communicated. The current Constructing Representations in Science Pedagogy (CRISP) project aims at wider scale implementation of the representation construction approach. This paper explores a range of issues that confronted four Year-8 teachers in implementing this research-developed approach, such as: preparedness of the teacher in terms of epistemological positioning and positioning as a learner, significant support for planning and modelling by the university expert, and a team ethos where teachers share ideas and plan jointly. The Year-8 teachers implemented a representation construction approach to the teaching of the topic of astronomy. The Interconnected Model of Teacher Growth (IMTG) (Clarke and Hollingworth, Teach. Educ., 18 (2001) 947) was used to analyse the teachers' experience in planning and delivering the teaching sequence. This model was found to be flexible in identifying the experiences of teachers in different situations and useful in identifying issues for implementation of a research-developed pedagogy.

  12. IMPLEMENTING FRANCHISING INTO A BUSINESS. : Based on my own business plan.

    OpenAIRE

    Krzyzaniak, Patryk

    2016-01-01

    The aim of the thesis is to successfully implement a business system based on franchising into the author's own business. The thesis will provide information about the actual busi-ness plan, theoretical and practical investigation on how franchising would efficiently work in the Finnish market, basic principles of cooperation on a franchise basis, categories of fran-chising (in general and in cooperation with the author's business plan), advantages and dis-advantages of having franchising as ...

  13. Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors. Future planning in a Kaupapa Māori CAMHS team.

    Science.gov (United States)

    Elder, Hinemoa; Milne, Moe; Witehira, Heemi; Mendes, Patrick; Heslin, Anneliese; Cribb-Su'a, Ainsleigh; Wilson, Riwai; Goldsmith, Arona; Kainamu, Reena; Barrett, Moana; Love, Shar; Cargo, Tania; Kalra, Vanitha

    2009-08-01

    The aim of this study was to identify and operationalize aspects of a future planning process for sustainable delivery of Kaupapa Māori (Specialist Māori) mental health from a team called He Kakano, within Child and Adolescent Mental Health Services in South Auckland, New Zealand. A 2-day hui (meeting) was held with members of the team and a facilitator, Whaea Moe Milne. Review of background national epidemiological data, local data, information from community, carer and tangata whaiora (consumer) stakeholders and the existing He Kakano Model of Care was undertaken. Use of tikanga (Māori protocol and practices) was evident throughout the hui. A number of aspects of tikanga were identified as essential to the positive outcomes of the future plan. This paper reports one in particular, that of whakatauakī (proverbs where the originator is known). "Whakaora nga moemoea o nga tupuna--living the dreams of the ancestors" is a whakatauakī articulated by Whaea Moe Milne, which was identified as helpful in influencing the strategic planning thinking and decision-making process for He Kakano. This whakatauakī enabled the identification of shared goals, values, beliefs, behaviours and an action plan. The existing and ongoing relationship with Whaea Moe Milne was identified as an important element in the way in which the whakatauakī was received and reflected on. Use of tikanga Māori, in this case, whakatauakī, was helpful in developing future planning for He Kakano. This suggests that use of tikanga may be beneficial in other settings where planning for sustainable Māori responsive services is undertaken. Further work in this area is likely to benefit service development, strategic planning, workforce development and have an impact on improving health outcomes for Māori.

  14. National plan to enhance aviation safety through human factors improvements

    Science.gov (United States)

    Foushee, Clay

    1990-01-01

    The purpose of this section of the plan is to establish a development and implementation strategy plan for improving safety and efficiency in the Air Traffic Control (ATC) system. These improvements will be achieved through the proper applications of human factors considerations to the present and future systems. The program will have four basic goals: (1) prepare for the future system through proper hiring and training; (2) develop a controller work station team concept (managing human errors); (3) understand and address the human factors implications of negative system results; and (4) define the proper division of responsibilities and interactions between the human and the machine in ATC systems. This plan addresses six program elements which together address the overall purpose. The six program elements are: (1) determine principles of human-centered automation that will enhance aviation safety and the efficiency of the air traffic controller; (2) provide new and/or enhanced methods and techniques to measure, assess, and improve human performance in the ATC environment; (3) determine system needs and methods for information transfer between and within controller teams and between controller teams and the cockpit; (4) determine how new controller work station technology can optimally be applied and integrated to enhance safety and efficiency; (5) assess training needs and develop improved techniques and strategies for selection, training, and evaluation of controllers; and (6) develop standards, methods, and procedures for the certification and validation of human engineering in the design, testing, and implementation of any hardware or software system element which affects information flow to or from the human.

  15. Promoting teamwork and surgical optimization: combining TeamSTEPPS with a specialty team protocol.

    Science.gov (United States)

    Tibbs, Sheila Marie; Moss, Jacqueline

    2014-11-01

    This quality improvement project was a 300-day descriptive preintervention and postintervention comparison consisting of a convenience sample of 18 gynecology surgical team members. We administered the Team Strategies & Tools to Enhance Performance and Patient Safety (TeamSTEPPS®) Teamwork Perception Questionnaire to measure the perception of teamwork. In addition, we collected data regarding rates of compliance (ie, huddle, time out) and measurable surgical procedure times. Results showed a statistically significant increase in the number of team members present for each procedure, 2.34 μ before compared with 2.61 μ after (P = .038), and in the final time-out (FTO) compliance as a result of a clarification of the definition of FTO, 1.05 μ before compared with 1.18 μ after (P = .004). Additionally, there was improvement in staff members' perception of teamwork. The implementation of team training, protocols, and algorithms can enhance surgical optimization, communication, and work relationships. Copyright © 2014 AORN, Inc. Published by Elsevier Inc. All rights reserved.

  16. The Cultural Challenges of Managing Global Project Teams: A Study of Brazilian Multinationals

    Directory of Open Access Journals (Sweden)

    Ivete Rodrigues

    2013-04-01

    Full Text Available The internationalization of Brazilian companies brings a new reality: the need for implementation of global projects that bring, in turn, the challenge of managing multicultural teams. Since this is a recent phenomenon with little theoretical development, this study sought to understand the relationships between cultural characteristics and management teams of global projects in Brazilian multinationals. To carry this discussion forward, we studied six cases of Brazilian multinational companies, with the aim of deepening the understanding of the management of global teams, involving the planning, deployment, development and management of human resources. Among the projects studied, it was found that there is very little concern with the specific issue of multiculturalism and little inter-cultural incentive to the development of team members, which ends up hindering the construction of a global mindset, important for the Brazilian multinational companies to perform successfully abroad. Faced with this situation, each of the managerial processes mentioned were presented with a number of actions to be undertaken by the project manager in three different dimensions: the project itself, the organization and the global environment. The work contributes, thus, to enable Brazilian multinational companies to manage their global teams in order to maximize the advantages of global teams, such as increased creativity and innovative capacity, but avoid the problems that multiculturalism can bring, ranging from conflicts between people to project failure.

  17. Exploring Graduate Students’ Attitudes towards Team Research and Their Scholarly Productivity: A Survey Guided by the Theory of Planned Behavior

    Directory of Open Access Journals (Sweden)

    Tianlan Wei

    2015-01-01

    Full Text Available This study explores the attitudinal and motivational factors underlying graduate students’ attitudes towards team research. Guided by the Theory of Planned Behavior, we hypothesize that attitude, subjective norm, and perceived behavioral control are three major determinants of graduate students’ intentions to conduct team research. An instrument was developed to measure the influences of these factors on students’ intentions and relevant scholarly productivity. A total of 281 graduate students from a large, comprehensive university in the southwest United States participated in the survey. Descriptive statistics reveal that around two-thirds of graduate students have no co-authored manuscripts submitted for publication since they started graduate school. Factor analyses validated the factor structure of the instrument, and the results of Structural Equation Modeling show that (a graduate students’ attitudes towards team research have a positive correlation with their attitudes towards individual research; (b attitude towards team research, subjective norm, and perceived behavioral control, along with students’ discipline/major areas and classification, account for 58% of the variance in the intention to conduct team research; and (c subjective norm appears to be the most influential factor in the model, followed by attitude; while perceived behavioral control is not of much importance. These findings provide implications for academic departments and programs to promote graduate students’ team research. Specifically, creating a climate for collaborative research in academic programs/disciplines/universities may work jointly with enhancing students’ appraisals of such collaborations.

  18. Corporate strategic plan for safeguards and security

    International Nuclear Information System (INIS)

    1997-06-01

    Department of Energy (DOE) safeguards and security (S and S) is a team effort, consisting of Field, National Laboratories, Program Office, and Headquarters units cooperating to support the Department's diverse security needs. As an integral part of the nation's security structure, the DOE S and S Program regularly supports and works in cooperation with other US Government agencies and private industry to improve the national security posture. Thus, inter- and intra-agency partnerships play an invaluable role in the continuing efforts to integrate and implement improved ways of doing business. Their Corporate Strategic Plan provides a road map to guide, track, and provide feedback for the incorporation and implementation of S and S activities within DOE. Part 1 Planning Framework, describes those overarching factors which influence the planning endeavors. Part 2, Strategic Perspective, outlines where the S and S Program has been and how they will move to the future through core competencies, changing cultural thinking, and implementing their strategies. Part 3, Strategic and Operational Integration, details critical focus areas, strategies, and success indicators designed to enhance inter-agency S and S integration and promote cooperation with external agencies. This Plan will be reviewed annually to ensure it remains supportive and fully-engaged with the nation's and international security environments

  19. 78 FR 28550 - Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter Counties...

    Science.gov (United States)

    2013-05-15

    ... ENVIRONMENTAL PROTECTION AGENCY 40 CFR Part 52 [EPA-R05-OAR-2013-0021;EPA-R05-OAR-2013-0022; FRL-9812-3] Approval and Promulgation of Air Quality Implementation Plans; Indiana; Lake and Porter... Porter State Implementation Plans (SIPs) for the 1997 8-hour ozone standard, and the 1997 annual fine...

  20. NASA strategic plan

    Science.gov (United States)

    1994-01-01

    The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.

  1. Development and Implementation of Team-Based Panel Management Tools: Filling the Gap between Patient and Population Information Systems.

    Science.gov (United States)

    Watts, Brook; Lawrence, Renée H; Drawz, Paul; Carter, Cameron; Shumaker, Amy Hirsch; Kern, Elizabeth F

    2016-08-01

    Effective team-based models of care, such as the Patient-Centered Medical Home, require electronic tools to support proactive population management strategies that emphasize care coordination and quality improvement. Despite the spread of electronic health records (EHRs) and vendors marketing population health tools, clinical practices still may lack the ability to have: (1) local control over types of data collected/reports generated, (2) timely data (eg, up-to-date data, not several months old), and accordingly (3) the ability to efficiently monitor and improve patient outcomes. This article describes a quality improvement project at the hospital system level to develop and implement a flexible panel management (PM) tool to improve care of subpopulations of patients (eg, panels of patients with diabetes) by clinical teams. An in-depth case analysis approach is used to explore barriers and facilitators in building a PM registry tool for team-based management needs using standard data elements (eg, laboratory values, pharmacy records) found in EHRs. Also described are factors that may contribute to sustainability; to date the tool has been adapted to 6 disease-focused subpopulations encompassing more than 200,000 patients. Two key lessons emerged from this initiative: (1) though challenging, team-based clinical end users and information technology needed to work together consistently to refine the product, and (2) locally developed population management tools can provide efficient data tracking for frontline clinical teams and leadership. The preliminary work identified critical gaps that were successfully addressed by building local PM registry tools from EHR-derived data and offers lessons learned for others engaged in similar work. (Population Health Management 2016;19:232-239).

  2. System Engineering Management and Implementation Plan for Project W-211, ''Initial Tank Retrieval Systems'' (ITRS)

    International Nuclear Information System (INIS)

    VAN BEEK, J.E.

    2000-01-01

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211

  3. System Engineering Management and Implementation Plan for Project W-211 Initial Tank Retrieval Systems (ITRS)

    Energy Technology Data Exchange (ETDEWEB)

    VAN BEEK, J.E.

    2000-05-05

    This systems Engineering Management and Implementation Plan (SEMIP) describes the Project W-211 implementation of the Tank Farm Contractor Systems Engineering Management Plan (TFC SEMP). The SEMIP defines the systems engineering products and processes used by the project to comply with the TFC SEMP, and provides the basis for tailoring systems engineering processes by applying a graded approach to identify appropriate systems engineering requirements for W-211.

  4. B Plant Complex pollution prevention plan. Revision 1

    International Nuclear Information System (INIS)

    Beam, T.G.

    1994-01-01

    The US Department of Energy (DOE) has directed Westinghouse Hanford Company (WHC) to develop an effective strategy to minimize the generation of hazardous, radioactive, and mixed wastes at Hanford in compliance with state and federal regulations. WHC has formalized a pollution prevention program composed of management policies, management requirements and procedures. This plan addresses pollution prevention for B Plant Complex. A pollution prevention team is in place and has been assigned responsibility for implementing the plan. This plan includes actions and goals for reducing volume and toxicity of waste generated, as well as a basis for evaluation of progress. Descriptions of waste streams, current specific goals, general pollution prevention methods, and specific accomplishments are in the appendices of this plan

  5. Student Teachers' Team Teaching: How Do Learners in the Classroom Experience Team-Taught Lessons by Student Teachers?

    Science.gov (United States)

    Baeten, Marlies; Simons, Mathea

    2016-01-01

    This study focuses on student teachers' team teaching. Two team teaching models (sequential and parallel teaching) were applied by 14 student teachers in a quasi-experimental design. When implementing new teaching models, it is important to take into account the perspectives of all actors involved. Although learners are key actors in the teaching…

  6. Gathering, strategizing, motivating and celebrating: the team huddle in a teaching general practice.

    Science.gov (United States)

    Walsh, Allyn; Moore, Ainsley; Everson, Jennifer; DeCaire, Katharine

    2018-03-01

    To understand how implementing a daily team huddle affected the function of a complex interprofessional team including learners. A qualitative descriptive study using semi-structured interviews in focus groups. An academic general practice teaching practice. All members of one interprofessional team, including nurses, general practitioners, junior doctors, and support staff. Focus group interviews using semi-structured guidance were transcribed and the results analysed using qualitative content analysis. Four interrelated themes were identified: communication and knowledge sharing; efficiency of care; relationship and team building; and shared responsibility for team function. The implementation of the daily team huddle was seen by participants to enhance the collaboration within the team and to contribute to work life enjoyment. Participants perceived that problems were anticipated and solved quickly. Clinical updates and information about patients benefited the team including learners. Junior doctors quickly understood the scope of practice of other team members, but some felt reluctant to offer clinical opinions. The implementation of a daily team huddle was viewed as worthwhile by this large interprofessional general practice team. The delivery of patient care was more efficient, knowledge was readily distributed, and problem solving was shared across the team, including junior doctors.

  7. Drivers and Effects of Enterprise Resource Planning Post-Implementation Learning

    Science.gov (United States)

    Chang, Hsiu-Hua; Chou, Huey-Wen

    2011-01-01

    The use of enterprise resource planning (ERP) systems has grown enormously since 1990, but the failure to completely learn how to use them continues to produce disappointing results. Today's rapidly changing business environment and the integrative applications of ERP systems force users to continuously learn new skills after ERP implementation.…

  8. Resources planning for radiological incidents management

    Science.gov (United States)

    Hamid, Amy Hamijah binti Ab.; Rozan, Mohd Zaidi Abd; Ibrahim, Roliana; Deris, Safaai; Yunus, Muhd. Noor Muhd.

    2017-01-01

    Disastrous radiation and nuclear meltdown require an intricate scale of emergency health and social care capacity planning framework. In Malaysia, multiple agencies are responsible for implementing radiological and nuclear safety and security. This research project focused on the Radiological Trauma Triage (RTT) System. This system applies patient's classification based on their injury and level of radiation sickness. This classification prioritizes on the diagnostic and treatment of the casualties which include resources estimation of the medical delivery system supply and demand. Also, this system consists of the leading rescue agency organization and disaster coordinator, as well as the technical support and radiological medical response teams. This research implemented and developed the resources planning simulator for radiological incidents management. The objective of the simulator is to assist the authorities in planning their resources while managing the radiological incidents within the Internal Treatment Area (ITA), Reception Area Treatment (RAT) and Hospital Care Treatment (HCT) phases. The majority (75%) of the stakeholders and experts, who had been interviewed, witnessed and accepted that the simulator would be effective to resolve various types of disaster and resources management issues.

  9. A multi-instructor, team-based, active-learning exercise to integrate basic and clinical sciences content.

    Science.gov (United States)

    Kolluru, Srikanth; Roesch, Darren M; Akhtar de la Fuente, Ayesha

    2012-03-12

    To introduce a multiple-instructor, team-based, active-learning exercise to promote the integration of basic sciences (pathophysiology, pharmacology, and medicinal chemistry) and clinical sciences in a doctor of pharmacy curriculum. A team-based learning activity that involved pre-class reading assignments, individual-and team-answered multiple-choice questions, and evaluation and discussion of a clinical case, was designed, implemented, and moderated by 3 faculty members from the pharmaceutical sciences and pharmacy practice departments. Student performance was assessed using a multiple-choice examination, an individual readiness assurance test (IRAT), a team readiness assurance test (TRAT), and a subjective, objective, assessment, and plan (SOAP) note. Student attitudes were assessed using a pre- and post-exercise survey instrument. Students' understanding of possible correct treatment strategies for depression improved. Students were appreciative of this true integration of basic sciences knowledge in a pharmacotherapy course and to have faculty members from both disciplines present to answer questions. Mean student score on the on depression module for the examination was 80.4%, indicating mastery of the content. An exercise led by multiple instructors improved student perceptions of the importance of team-based teaching. Integrated teaching and learning may be achieved when instructors from multiple disciplines work together in the classroom using proven team-based, active-learning exercises.

  10. Building a culture of safety through team training and engagement.

    Science.gov (United States)

    Thomas, Lily; Galla, Catherine

    2013-05-01

    Medical errors continue to occur despite multiple strategies devised for their prevention. Although many safety initiatives lead to improvement, they are often short lived and unsustainable. Our goal was to build a culture of patient safety within a structure that optimised teamwork and ongoing engagement of the healthcare team. Teamwork impacts the effectiveness of care, patient safety and clinical outcomes, and team training has been identified as a strategy for enhancing teamwork, reducing medical errors and building a culture of safety in healthcare. Therefore, we implemented Team Strategies and Tools to Enhance Performance and Patient Safety (TeamSTEPPS), an evidence-based framework which was used for team training to create transformational and/or incremental changes; facilitating transformation of organisational culture, or solving specific problems. To date, TeamSTEPPS (TS) has been implemented in 14 hospitals, two Long Term Care Facilities, and outpatient areas across the North Shore LIJ Health System. 32 150 members of the healthcare team have been trained. TeamSTEPPS was piloted at a community hospital within the framework of the health system's organisational care delivery model, the Collaborative Care Model to facilitate sustainment. AHRQ's Hospital Survey on Patient Safety Culture, (HSOPSC), was administered before and after implementation of TeamSTEPPS, comparing the perception of patient safety by the heathcare team. Pilot hospital results of HSOPSC show significant improvement from 2007 (pre-TeamSTEPPS) to 2010. System-wide results of HSOPSC show similar trends to those seen in the pilot hospital. Valuable lessons for organisational success from the pilot hospital enabled rapid spread of TeamSTEPPS across the rest of the health system.

  11. Concept mapping to improve team work, team learning and care of the person with dementia and behavioural and psychological symptoms.

    Science.gov (United States)

    Aberdeen, Suzanne M; Byrne, Graeme

    2018-04-01

    The incidence of behavioural and psychological symptoms of dementia in residential aged care facilities is high. Effective team work and knowledgeable staff are cited as important facilitators of appropriate care responses to clients with these symptoms, but to achieve this within a resource-poor workplace can be challenging. In the study reported in this paper, concept mapping was trialled to enhance multifocal person-centred assessment and care planning as well as team learning. The outcomes of team concept mapping were evaluated using a quasi-experimental design with pre- and post-testing in 11 selected Australian residential aged care facilities , including two control residential aged care facilities , over a nine-month period. It was demonstrated that use of concept mapping improved team function, measured as effectiveness of care planning, as well as enhancing learning, with increased knowledge of dementia care even amongst staff who were not directly involved with the process. It is suggested that these results may be generalizable to other countries and care settings.

  12. Issues for the Traveling Team Physician.

    Science.gov (United States)

    Kaeding, Christopher C; Borchers, James

    2016-07-01

    This article outlines the value of having the team physician traveling with athletes to away venues for competitions or training sessions. At present, this travel presents several issues for the team physician who crosses state lines for taking care of the athletes. In this article, these issues and their possible remedies are discussed. A concern for the travelling team physician is practicing medicine while caring for the team in a state where the physician is not licensed. Another issue can be the transportation of controlled substances in the course of providing optimal care for the team athletes. These two issues are regulatory and legislative issues at both the state and federal levels. On the practical side of being a team physician, the issues of emergency action plans, supplies, and when to transport injured or ill patients are also reviewed. Thieme Medical Publishers 333 Seventh Avenue, New York, NY 10001, USA.

  13. Environment, safety, and health regulatory implementation plan

    International Nuclear Information System (INIS)

    1993-01-01

    To identify, document, and maintain the Uranium Mill Tailings Remedial Action (UMTRA) Project's environment, safety, and health (ES ampersand H) regulatory requirements, the US Department of Energy (DOE) UMTRA Project Office tasked the Technical Assistance Contractor (TAC) to develop a regulatory operating envelope for the UMTRA Project. The system selected for managing the UMTRA regulatory operating envelope data bass is based on the Integrated Project Control/Regulatory Compliance System (IPC/RCS) developed by WASTREN, Inc. (WASTREN, 1993). The IPC/RCS is a tool used for identifying regulatory and institutional requirements and indexing them to hardware, personnel, and program systems on a project. The IPC/RCS will be customized for the UMTRA Project surface remedial action and groundwater restoration programs. The purpose of this plan is to establish the process for implementing and maintaining the UMTRA Project's regulatory operating envelope, which involves identifying all applicable regulatory and institutional requirements and determining compliance status. The plan describes how the Project will identify ES ampersand H regulatory requirements, analyze applicability to the UMTRA Project, and evaluate UMTRA Project compliance status

  14. Updated action plan for the implementation of measures as a consequence of the Fukushima reactor accident

    International Nuclear Information System (INIS)

    2014-01-01

    The action plan of the German government concerning the measures following the Fukushima reactor accident include the decision on the future of nuclear power in Germany, safety analyses, investigations and measures for nuclear power plants in a national frame, investigations in an international frame, planning for the implementation of CNS (Convention on nuclear safety) topics 1-3, i.e. measures to increase the robustness in German nuclear power plants, and the planning of implementation of further measures (CNS topics 4-6).

  15. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Pohan, Vivi Gusrini Rahmadani; Ancok, Djamaludin

    2010-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  16. Team Learning Ditinjau dari Team Diversity dan Team Efficacy

    OpenAIRE

    Vivi Gusrini Rahmadani Pohan; Djamaludin Ancok

    2015-01-01

    This research attempted to observe team learning from the level of team diversity and team efficacy of work teams. This research used an individual level of analysis rather than the group level. The team members measured the level of team diversity, team efficacy and team learning of the teams through three scales, namely team learning scale, team diversity scale, and team efficacy scale. Respondents in this research were the active team members in a company, PT. Alkindo Mitraraya. The total ...

  17. Current Strategic Business Plan for the Implementation of Digital Systems.

    Science.gov (United States)

    Library of Congress, Washington, DC. National Library Service for the Blind and Physically Handicapped.

    This document presents a current strategic business plan for the implementation of digital systems and services for the free national library program operated by the National Library Service for the Blind and Physically Handicapped, Library of Congress, its network of cooperating regional and local libraries, and the United States Postal Service.…

  18. Going digital: a checklist in preparing for hospital-wide electronic medical record implementation and digital transformation.

    Science.gov (United States)

    Scott, Ian A; Sullivan, Clair; Staib, Andrew

    2018-05-24

    Objective In an era of rapid digitisation of Australian hospitals, practical guidance is needed in how to successfully implement electronic medical records (EMRs) as both a technical innovation and a major transformative change in clinical care. The aim of the present study was to develop a checklist that clearly and comprehensively defines the steps that best prepare hospitals for EMR implementation and digital transformation. Methods The checklist was developed using a formal methodological framework comprised of: literature reviews of relevant issues; an interactive workshop involving a multidisciplinary group of digital leads from Queensland hospitals; a draft document based on literature and workshop proceedings; and a review and feedback from senior clinical leads. Results The final checklist comprised 19 questions, 13 related to EMR implementation and six to digital transformation. Questions related to the former included organisational considerations (leadership, governance, change leaders, implementation plan), technical considerations (vendor choice, information technology and project management teams, system and hardware alignment with clinician workflows, interoperability with legacy systems) and training (user training, post-go-live contingency plans, roll-out sequence, staff support at point of care). Questions related to digital transformation included cultural considerations (clinically focused vision statement and communication strategy, readiness for change surveys), management of digital disruption syndromes and plans for further improvement in patient care (post-go-live optimisation of digital system, quality and benefit evaluation, ongoing digital innovation). Conclusion This evidence-based, field-tested checklist provides guidance to hospitals planning EMR implementation and separates readiness for EMR from readiness for digital transformation. What is known about the topic? Many hospitals throughout Australia have implemented, or are planning

  19. Smart or Diverse Start-up Teams?

    DEFF Research Database (Denmark)

    Hoogendoorn, Sander; Parker, Simon C.; Van Praag, Mirjam

    2017-01-01

    This paper explores the relationship between cognitive abilities and team performance in a start-up setting. We argue that performance in this setting hinges on three tasks: opportunity recognition, problem solving, and implementation. We theorize that cognitive ability at the individual level has...... others can be assigned to tasks that impose a greater cognitive load (problem solving or opportunity recognition). We present the results of a field experiment in which 573 students in 49 teams started up and managed real companies. We ensured exogenous variation in—otherwise random—team composition...... by assigning students to teams based on their measured cognitive abilities. Each team performed a variety of tasks, often involving complex decision making. The key result of the experiment is that the performance of start-up teams first increases and then decreases with ability dispersion. Strikingly, average...

  20. [Design of a HACCP Plan for the Gouda-type cheesemaking process in a milk processing plant].

    Science.gov (United States)

    Dávila, Jacqueline; Reyes, Genara; Corzo, Otoniel

    2006-03-01

    The Hazard Analysis and Critical Control Point (HACCP) is a preventive and systematic method used to identify, assess and control of the hazards related with raw material, ingredients, processing, marketing and intended consumer in order to assure the safety of the food. The aim of this study was to design a HACCP plan for implementing in a Gouda-type cheese-making process in a dairy processing plant. The used methodology was based in the application of the seven principles of the HACCP, the information from the plant about the compliment of the pre-requisite programs (70-80%), the experience of the HACCP team and the sequence of stages settles down by the COVENIN standard 3802 for implementing the HACCP system. A HACCP plan was proposed with the scope, the selection of HACCP team, the description of the product and the intended use, the flow diagram of the process, the hazard analysis and the control table of the plan with the critical control points (CCP). The following CCP were identified in the process: pasteurization, coagulation and ripening.

  1. 40 CFR 52.142 - Federal Implementation Plan for Tri-Cities landfill, Salt River Pima-Maricopa Indian Community.

    Science.gov (United States)

    2010-07-01

    ...-Cities landfill, Salt River Pima-Maricopa Indian Community. 52.142 Section 52.142 Protection of... IMPLEMENTATION PLANS Arizona § 52.142 Federal Implementation Plan for Tri-Cities landfill, Salt River Pima... the Tri-Cities landfill located on the Salt River Pima-Maricopa Indian Community near Phoenix, Arizona...

  2. 40 CFR 109.5 - Development and implementation criteria for State, local and regional oil removal contingency plans.

    Science.gov (United States)

    2010-07-01

    ... regional oil removal contingency plans. Criteria for the development and implementation of State, local and... 40 Protection of Environment 21 2010-07-01 2010-07-01 false Development and implementation criteria for State, local and regional oil removal contingency plans. 109.5 Section 109.5 Protection of...

  3. Knowledge co-production and boundary work to promote implementation of conservation plans.

    Science.gov (United States)

    Nel, Jeanne L; Roux, Dirk J; Driver, Amanda; Hill, Liesl; Maherry, Ashton C; Snaddon, Kate; Petersen, Chantel R; Smith-Adao, Lindie B; Van Deventer, Heidi; Reyers, Belinda

    2016-02-01

    Knowledge co-production and boundary work offer planners a new frame for critically designing a social process that fosters collaborative implementation of resulting plans. Knowledge co-production involves stakeholders from diverse knowledge systems working iteratively toward common vision and action. Boundary work is a means of creating permeable knowledge boundaries that satisfy the needs of multiple social groups while guarding the functional integrity of contributing knowledge systems. Resulting products are boundary objects of mutual interest that maintain coherence across all knowledge boundaries. We examined how knowledge co-production and boundary work can bridge the gap between planning and implementation and promote cross-sectoral cooperation. We applied these concepts to well-established stages in regional conservation planning within a national scale conservation planning project aimed at identifying areas for conserving rivers and wetlands of South Africa and developing an institutional environment for promoting their conservation. Knowledge co-production occurred iteratively over 4 years in interactive stake-holder workshops that included co-development of national freshwater conservation goals and spatial data on freshwater biodiversity and local conservation feasibility; translation of goals into quantitative inputs that were used in Marxan to select draft priority conservation areas; review of draft priority areas; and packaging of resulting map products into an atlas and implementation manual to promote application of the priority area maps in 37 different decision-making contexts. Knowledge co-production stimulated dialogue and negotiation and built capacity for multi-scale implementation beyond the project. The resulting maps and information integrated diverse knowledge types of over 450 stakeholders and represented >1000 years of collective experience. The maps provided a consistent national source of information on priority conservation areas

  4. Issues and dilemmas in preparation and implementation of the spatial plan of the municipality

    Directory of Open Access Journals (Sweden)

    Maksin Marija

    2012-01-01

    Full Text Available Disadvantages of the Serbian planning system and dilemmas about the role of spatial planning in Serbia mainly is reflected at the local level of spatial planning. The focus of the spatial plan of the municipality from the strategic to regulatory role has been shifted by the changes of legal basis. In this paper the key issues and dilemmas in the practice of preparation and implementation of the spatial plan of the municipality in Serbia are pointed out. The review of the three key issues of importance for the direct implementation of planning solutions and concepts: identification of the construction zone, the establishment of rules for the protection, arrangement and construction of physical (natural, landscape and functional entities and settlements, and elaboration of arrangement scheme for the settlement are presented. It has still not made clear what the arrangement scheme for the settlement should represent, so that in practice there is wide variety of schemes, usually completely unenforceable. Good examples of arrangement schemes elaboration within spatial plan of the municipality have been presented and analyzed. Suggestions for improving the content of the strategic and regulatory elements of the spatial plan of the municipality, as well as recommendations to the basic content of the arrangement scheme for settlement as a part of this spatial plan are proposed.

  5. 42 CFR 495.338 - Health information technology implementation advance planning document requirements (HIT IAPD).

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 5 2010-10-01 2010-10-01 false Health information technology implementation... CERTIFICATION STANDARDS FOR THE ELECTRONIC HEALTH RECORD TECHNOLOGY INCENTIVE PROGRAM Requirements Specific to the Medicaid Program § 495.338 Health information technology implementation advance planning document...

  6. Moving towards a new vision: implementation of a public health policy intervention

    Directory of Open Access Journals (Sweden)

    Ruta Valaitis

    2016-05-01

    Full Text Available Abstract Background Public health systems in Canada have undergone significant policy renewal over the last decade in response to threats to the public’s health, such as severe acute respiratory syndrome. There is limited research on how public health policies have been implemented or what has influenced their implementation. This paper explores policy implementation in two exemplar public health programs -chronic disease prevention and sexually-transmitted infection prevention - in Ontario, Canada. It examines public health service providers’, managers’ and senior managements’ perspectives on the process of implementation of the Ontario Public Health Standards 2008 and factors influencing implementation. Methods Public health staff from six health units representing rural, remote, large and small urban settings were included. We conducted 21 focus groups and 18 interviews between 2010 (manager and staff focus groups and 2011 (senior management interviews involving 133 participants. Research assistants coded transcripts and researchers reviewed these; the research team discussed and resolved discrepancies. To facilitate a breadth of perspectives, several team members helped interpret the findings. An integrated knowledge translation approach was used, reflected by the inclusion of academics as well as decision-makers on the team and as co-authors. Results Front line service providers often were unaware of the new policies but managers and senior management incorporated them in operational and program planning. Some participants were involved in policy development or provided feedback prior to their launch. Implementation was influenced by many factors that aligned with Greenhalgh and colleagues’ empirically-based Diffusion of Innovations in Service Organizations Framework. Factors and related components that were most clearly linked to the OPHS policy implementation were: attributes of the innovation itself; adoption by individuals

  7. 78 FR 10589 - Revision of Air Quality Implementation Plan; California; Sacramento Metropolitan Air Quality...

    Science.gov (United States)

    2013-02-14

    ... Quality Implementation Plan; California; Sacramento Metropolitan Air Quality Management District... Sacramento Metropolitan Air Quality Management District (SMAQMD or District) portion of the California State... sources within the areas covered by the plan as necessary to assure that the National Ambient Air Quality...

  8. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  9. Research on Team-teaching in Mathematics Education

    OpenAIRE

    重松, 敬一; 井戸野, 佐知子; 勝美, 芳雄

    1995-01-01

    Recently, there are many classes in which at least two teachers teach mathematics in elementary and lower secondary schools. We call that kind of teaching team-teaching. In some countries, it is called co-operative teaching. In this paper, we investigate the concept of team-teaching in mathematics education implementing a questionnaire, interviews or observing classroom lessons. Today, team-teaching has been administratively systematized. For example, additive teachers are sent to local schoo...

  10. Emergency response planning in Pennsylvania

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1988-01-01

    In the decade since the accident at Three Mile Island, emergency planning for response to these events has undergone a significant change in Pennsylvania, as elsewhere. Changes respond to federal guidance and to state agency initiatives. The most singular change is the practice of implementing a protective action throughout the entire emergency planning zone (EPZ). Due to Pennsylvania agency experiences during the accident, the decision was made soon after to develop a staff of nuclear engineers, each giving special day-to-day attention to a specific nuclear power station in the state. Changes in communications capabilities are significant, these being dedicated phone lines between the Commonwealth and each power station, and the reorientation of the Department of Environmental Resources radio network to accommodate direction of field monitoring teams from Harrisburg. Changes that are being or will be implemented in the near future include assessing the emergency response data system for electronic delivery of plant parameter data form facilities during accidents, increased participation in exercises, emergency medical planning, and training, the inclusion of all 67 counties in Pennsylvania in an ingestion EPZ, and the gradual severance of dependence on land-line emergency communication systems

  11. Work in Progress: The Seven Rs of Team Building

    Science.gov (United States)

    Brunelli, Jean; Schneider, Elaine Fogel

    2004-01-01

    This article argues that supportive teams--including professionals, paraprofessionals, and parents--can teach staff members how to identify and implement best practices in early intervention settings. The authors describe "the seven Rs of team building" distilled from their many years of team building and maintenance: 1) Reading cues; 2) Regular…

  12. Employee Perceptions of Their Organization's Level of Emergency Preparedness Following a Brief Workplace Emergency Planning Educational Presentation.

    Science.gov (United States)

    Renschler, Lauren A; Terrigino, Elizabeth A; Azim, Sabiya; Snider, Elsa; Rhodes, Darson L; Cox, Carol C

    2016-06-01

    A brief emergency planning educational presentation was taught during work hours to a convenience sample of employees of various workplaces in Northern Missouri, USA. Participants were familiarized with details about how an emergency plan is prepared by management and implemented by management-employee crisis management teams - focusing on both employee and management roles. They then applied the presentation information to assess their own organization's emergency preparedness level. Participants possessed significantly (p employees to become more involved in their organization's emergency planning and response. Educational strategies that involve management-employee collaboration in activities tailored to each workplace's operations and risk level for emergencies should be implemented.

  13. MEDBASE: Strategic Planning and Implementation of an Army Medical Department Software Application

    Science.gov (United States)

    2003-07-17

    downtime procedures) Software/ hardware performance testing Contingency plans Celebration / people management Risk Zone 4 Planning for upgrades...goal to “Crush Adidas !” and Honda’s goal in 1970 to “destroy Yamaha!”. MEDBASE: Strategy and Implementation 57 (3) Role Model BHAGs suit up-and...Crush Adidas ! (Nike, 1960s) Yamaha so tsubusu! We will destroy Yamaha! (Honda, 1970s) Role-Model BHAGs suit up-and-coming organizations Become the

  14. Komplikationer i forbindelse med kejsersnit i elektivt sectio-team

    DEFF Research Database (Denmark)

    Bülow-Lehnsby, Anne Lene; Grønbeck, Lene; Krebs, Lone

    2006-01-01

    INTRODUCTION: Two Danish hospitals have introduced a new organizing structure according to which planned caesarean sections are performed by a team. Caesareans are normally carried out without complications, and this makes it possible to evaluate complications to the surgery isolatedly. The object...... of this article was to describe the medical complications in mother and child of planned caesarean section performed in team. MATERIALS AND METHODS: A total of 534 caesarean sections were performed in team in 2004. Information on complications to caesarean sections was obtained from medical records. RESULTS......: The most frequent complication was blood loss of more than 1000 millilitres occurring in 2,2%. Other complications occurred with frequencies of about or less than 1%. 7% of the patients experienced a complication to caesarean performed in team. Respiratory morbidity occurred in 3.2% of the infants...

  15. The Value of Multidisciplinary Team Meetings for Patients with Gastrointestinal Malignancies: A Systematic Review.

    Science.gov (United States)

    Basta, Yara L; Bolle, Sifra; Fockens, Paul; Tytgat, Kristien M A J

    2017-09-01

    The incidence of gastrointestinal (GI) cancer is rising and most patients with GI malignancies are discussed by a multidisciplinary team (MDT). We performed a systematic review to assess whether MDTs for patients with GI malignancies can correctly change diagnosis, tumor stage and subsequent treatment plan, and whether the treatment plan was implemented. We performed a systematic review according to the Preferred Reporting Items for Systematic Reviews and Meta-Analyses guidelines. We conducted a search of the PubMed, MEDLINE and EMBASE electronic databases, and included studies relating to adults with a GI malignancy discussed by an MDT prior to the start of treatment which described a change of initial diagnosis, stage or treatment plan. Two researchers independently evaluated all retrieved titles and abstracts from the abovementioned databases. Overall, 16 studies were included; the study quality was rated as fair. Four studies reported that MDTs changed the diagnoses formulated by individual physicians in 18.4-26.9% of evaluated cases; two studies reported that MDTs formulated an accurate diagnosis in 89 and 93.5% of evaluated cases, respectively; nine studies described that the treatment plan was altered in 23.0-41.7% of evaluated cases; and four studies found that MDT decisions were implemented in 90-100% of evaluated cases. The reasons for altering a treatment plan included the patient's wishes, and comorbidities. MDT meetings for patients with a GI malignancy are responsible for changes in diagnoses and management in a significant number of patients. Treatment plans formulated by MDTs are implemented in 90-100% of discussed patients. All patients with a GI malignancy should be discussed by an MDT.

  16. Implementing Trauma-Informed Partner Violence Assessment in Family Planning Clinics.

    Science.gov (United States)

    Decker, Michele R; Flessa, Sarah; Pillai, Ruchita V; Dick, Rebecca N; Quam, Jamie; Cheng, Diana; McDonald-Mosley, Raegan; Alexander, Kamila A; Holliday, Charvonne N; Miller, Elizabeth

    2017-09-01

    Intimate partner violence (IPV) and reproductive coercion (RC) are associated with poor reproductive health. Little is known about how family planning clinics implement brief IPV/RC assessment interventions in practice. We describe the uptake and impact of a brief, trauma-informed, universal IPV/RC assessment and education intervention. Intervention implementation was evaluated via a mixed methods study among women ages 18 and up receiving care at one of two family planning clinics in greater Baltimore, MD. This mixed methods study entailed a quasi-experimental, single group pretest-posttest study with family planning clinic patients (baseline and exit survey n = 132; 3-month retention n = 68; retention rate = 52%), coupled with qualitative interviews with providers and patients (total n = 35). Two thirds (65%) of women reported receiving at least one element of the intervention on their exit survey immediately following the clinic-visit. Patients reported that clinic-based IPV assessment is helpful, irrespective of IPV history. Relative to those who reported neither, participants who received either intervention element reported greater perceived caring from providers, confidence in provider response to abusive relationships, and knowledge of IPV-related resources at follow-up. Providers and patients alike described the educational card as a valuable tool. Participants described trade-offs of paper versus in-person, electronic medical record-facilitated screening, and patient reluctance to disclose current situations of abuse. In real-world family planning clinic settings, a brief assessment and support intervention was successful in communicating provider caring and increasing knowledge of violence-related resources, endpoints previously deemed valuable by IPV survivors. Results emphasize the merit of universal education in IPV/RC clinical interventions over seeking IPV disclosure.

  17. Environmental implementation plan

    International Nuclear Information System (INIS)

    Peterson, G.L.

    1994-01-01

    In this document, the Savannah River site environmental programs and plans from DOE contractors and Westinghouse Savannah River Company divisions/departments are presented along with the environmental coordinator for each program. The objectives are to enhase communication of existing or planned programs to do the following: identify activities required for meeting environmental needs; identify needing resources and a schedule to accomplish those activities; promote share-savings and consistency in those activities

  18. The Genesis of a Trauma Performance Improvement Plan.

    Science.gov (United States)

    Pidgeon, Kristopher

    2015-01-01

    The purpose of this article is to assist the trauma medical and program director with developing a performance improvement and patients safety plan (PIPS), which is a required component of a successful trauma verification process by the American College of Surgeons. This article will review trauma quality standards and will describe in detail the required elements of a successful trauma center's performance improvement plan including a written comprehensive plan that outlines the mission and vision of the PIPS Program, authority of the PIPS Program, PIPS Program Committee reporting structure to the other hospital committees, list of required PIPS multidisciplinary team members, the operational components of the utilized data management system (trauma registry), list of indicators/audit filters, levels of review, peer determinations, corrective action plan with implementation, event resolution, and reevaluation. Strategies to develop a successful trauma performance improvement plan are presented.

  19. Implementation Plan for Chemical Industry R&D Roadmap for Nanomaterials by Design

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2006-04-01

    The purpose of this effort is to develop an implementation plan to realize the vision and goals identified in the Chemical Industry R&D Roadmap for Nanomaterials By Design: From Fundamentals to Function.

  20. Performance expectation plan

    Energy Technology Data Exchange (ETDEWEB)

    Ray, P.E.

    1998-09-04

    This document outlines the significant accomplishments of fiscal year 1998 for the Tank Waste Remediation System (TWRS) Project Hanford Management Contract (PHMC) team. Opportunities for improvement to better meet some performance expectations have been identified. The PHMC has performed at an excellent level in administration of leadership, planning, and technical direction. The contractor has met and made notable improvement of attaining customer satisfaction in mission execution. This document includes the team`s recommendation that the PHMC TWRS Performance Expectation Plan evaluation rating for fiscal year 1998 be an Excellent.