WorldWideScience

Sample records for impacts monitoring plan

  1. Routine Radiological Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs

  2. Idaho National Laboratory Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2008-04-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  3. Environmental Monitoring Plan, Revision 6

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Bertoldo, N A; Blake, R G; Campbell, C G; Grayson, A R; Nelson, J C; Revelli, M A; Rosene, C A; Wegrecki, T; Williams, R A; Wilson, K R; Jones, H E

    2012-03-02

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection of the Public and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality; (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work; and (3) An integrated sampling approach to avoid duplicative data collection. LLNL prepares the EMP because it provides an organizational framework for ensuring that environmental monitoring work, which is integral to the implementation of LLNL's Environmental Management System, is conducted appropriately. Furthermore, the Environmental Monitoring Plan helps LLNL ensure compliance with DOE Order 231.1 Change 2, Environment, Safety and Health Reporting

  4. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    International Nuclear Information System (INIS)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability

  5. Study of the Cherokee Nuclear Station: projected impacts, monitoring plan, and mitigation options for Cherokee County, South Carolina

    Energy Technology Data Exchange (ETDEWEB)

    Peelle, E.; Schweitzer, M.; Scharre, P.; Pressman, B.

    1979-07-01

    This report inventories Cherokee County's capabilities and CNS project characteristics, projects expected impacts from the interaction of the two defines four options for Cherokee County decision makers, and presents a range of possible mitigation and monitoring plans for dealing with the problems identified. The four options and general implementation guidelines for each are presented after reviewing pertinent features of other mitigation and monitoring plans. The four options include (1) no action, (2) preventing impacts by preventing growth, (3) selective growth in designated areas as services can be supplied, and (4) maximum growth designed to attract as many in-movers as possible through a major program of capital investiments in public and private services. With the exception of the no action option, all plans deal with impacts according to some strategy determined by how the County wishes to manage growth. Solutions for impact problems depend on which growth strategy is selected and what additional resources are secured during the impact period. A monitoring program deals with the problems of data and projections uncertainty, while direct action is proposed to deal with the institutional problems of delay of the needed access road, timeing and location problems from the tax base mismatch, and lack of local planning capability.

  6. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2012-08-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  7. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Joanne L. Knight

    2010-10-01

    This plan describes environmental monitoring as required by U.S. Department of Energy (DOE) Order 450.1, “Environmental Protection Program,” and additional environmental monitoring currently performed by other organizations in and around the Idaho National Laboratory (INL). The objective of DOE Order 450.1 is to implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations. This plan describes the organizations responsible for conducting environmental monitoring across the INL, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. This plan presents a summary of the overall environmental monitoring performed in and around the INL without duplicating detailed information in the various monitoring procedures and program plans currently used to conduct monitoring.

  8. Environmental Monitoring Plan, Revision 5

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G M; Blake, R G; Bertoldo, N A; Campbell, C G; Coty, J; Folks, K; Grayson, A R; Jones, H E; Nelson, J C; Revelli, M A; Wegrecki, T; Williams, R A; Wilson, K

    2010-01-27

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 450.1A, Environmental Protection Program. Specifically, in conformance with DOE Order 450.1A, Attachment 1, paragraph 1(b)(5), environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the biota in the vicinity of LLNL. Environmental monitoring also serves to demonstrate compliance with permits and other regulatory requirements. The Environmental Monitoring Plan (EMP) addresses the sample collection and analytical work supporting environmental monitoring to ensure the following: (1) A consistent system for collecting, assessing, and documenting environmental data of known and documented quality. (2) A validated and consistent approach for sampling and analysis of samples to ensure laboratory data meets program-specific needs and requirements within the framework of a performance-based approach for analytical laboratory work. (3) An integrated sampling approach to avoid duplicative data collection. Until its cancellation in January 2003, DOE Order 5400.1 required the preparation of an environmental monitoring plan. Neither DOE Order 450.1A nor the ISO 14001 standard are as prescriptive as DOE Order 5400.1, in that neither expressly requires an EMP. However, LLNL continues to prepare the EMP because it provides an organizational framework for

  9. Mitigation Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The Final Supplemental Environmental Impact Report (SEIR) (September 1992) for the Proposed Renewal of the Contract between the United States Department of Energy and The Regents of the University of California for the Operation and Management of the Lawrence Berkeley Laboratory identifies the environmental impacts associated with renewing the contract and specifies a series of measures designed to mitigate adverse impacts to the environment. This Mitigation Monitoring Plan describes the procedures the University will use to implement the mitigation measures adopted in connection with the approval of the Contract.

  10. Routine Radiological Environmental Monitoring Plan. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1999-12-31

    The U.S. Department of Energy manages the Nevada Test Site in a manner that meets evolving DOE Missions and responds to the concerns of affected and interested individuals and agencies. This Routine Radiological Monitoring Plan addressess complicance with DOE Orders 5400.1 and 5400.5 and other drivers requiring routine effluent monitoring and environmental surveillance on the Nevada Test Site. This monitoring plan, prepared in 1998, addresses the activities conducted onsite NTS under the Final Environmental Impact Statement and Record of Decision. This radiological monitoring plan, prepared on behalf of the Nevada Test Site Landlord, brings together sitewide environmental surveillance; site-specific effluent monitoring; and operational monitoring conducted by various missions, programs, and projects on the NTS. The plan provides an approach to identifying and conducting routine radiological monitoring at the NTS, based on integrated technical, scientific, and regulatory complicance data needs.

  11. Idaho National Laboratory Site Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Nordstrom, Jenifer [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2014-02-01

    This plan provides a high-level summary of environmental monitoring performed by various organizations within and around the Idaho National Laboratory (INL) Site as required by U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, and DOE Order 458.1, Radiation Protection of the Public and the Environment, Guide DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, and in accordance with 40 Code of Federal Regulations (CFR) 61, National Emission Standards for Hazardous Air Pollutants. The purpose of these orders is to 1) implement sound stewardship practices that protect the air, water, land, and other natural and cultural resources that may be impacted by DOE operations, and 2) to establish standards and requirements for the operations of DOE and DOE contractors with respect to protection of the environment and members of the public against undue risk from radiation. This plan describes the organizations responsible for conducting environmental monitoring across the INL Site, the rationale for monitoring, the types of media being monitored, where the monitoring is conducted, and where monitoring results can be obtained. Detailed monitoring procedures, program plans, or other governing documents used by contractors or agencies to implement requirements are referenced in this plan. This plan covers all planned monitoring and environmental surveillance. Non-routine activities such as special research studies and characterization of individual sites for environmental restoration are outside the scope of this plan.

  12. Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Holland, R.C. [Science Applications International Corp., San Diego, CA (United States)

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed.

  13. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1993-07-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. This revision to the Environmental Monitoring Plan was written to document the changes made to the Monitoring Program during 1992. Some of the data (most notably the statistical analyses of past monitoring data) has not been changed

  14. Facility effluent monitoring plan for the tank farm facility

    Energy Technology Data Exchange (ETDEWEB)

    Crummel, G.M.

    1998-05-18

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements.

  15. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Geiger, J.L.

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified. in. A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  16. Facility Effluent Monitoring Plan for the 222-S Laboratory

    International Nuclear Information System (INIS)

    Robinson, A.V.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems against applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. The current operation of the 222-S facilities includes the provision of analytical and radiological chemistry services in support of Hanford Site processing plants. The emphasis is on waste management, chemical processing, environmental monitoring effluent programs at B Plant, the Uranium Oxide Plant, Tank Farms, the 242-A Evaporator, the Waste Encapsulation and Storage Facility, the Plutonium-Uranium Extraction Facility, the Plutonium Finishing Plant, process development/impact activities, and essential materials. The laboratory also supplies analytical services in support of ongoing waste tank characterization

  17. Environmental monitoring plan

    International Nuclear Information System (INIS)

    Holland, R.C.

    1997-02-01

    This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs

  18. Facility effluent monitoring plan for the B plant

    International Nuclear Information System (INIS)

    Lesser, J.E.

    1994-09-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plant assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated every three years

  19. Facility Effluent Monitoring Plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  20. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  1. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-06-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the Facility Monitoring Plans of the overall site-wide environmental monitoring plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of individual Facility Effluent Monitoring Plans. This document is intended to be a basic road map to the Facility Effluent Monitoring Plan documents (i.e., the guidance document for preparing Facility Effluent Monitoring Plans, Facility Effluent Monitoring Plan determinations, management plan, and Facility Effluent Monitoring Plans). The implementing procedures, plans, and instructions are appropriate for the control of effluent monitoring plans requiring compliance with US Department of Energy, US Environmental Protection Agency, state, and local requirements. This Quality Assurance Project Plan contains a matrix of organizational responsibilities, procedural resources from facility or site manuals used in the Facility Effluent Monitoring Plans, and a list of the analytes of interest and analytical methods for each facility preparing a Facility Effluent Monitoring Plan. 44 refs., 1 figs., 2 tabs

  2. Mitigation and monitoring plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1992-06-01

    The U.S Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project. The UMTRA Project is the result of the Uranium Mill Tailings Radiation Control Act(UMTRA) which was passed in response to the public's concern over the potential public health hazards related to uranium mill tailings and associated contaminated material at abandoned or otherwise uncontrolled inactive processing sites throughout the United States. The Gunnison, Colorado abandoned uranium mill site is one of the sites slated for cleanup by the DOE under authority of UMTRA. The contaminated material at this site will be transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities will temporarily disturb 0.8 acre and permanently eliminate 5.1 acres of wetlands. This report describes the proposed mitigation plan for the 5.9 acres of impacted wetlands. In conjunction with the mitigation of the permanently impacted wetlands through the enhancement of wetland and adjacent riparian areas, impacts to wildlife as a result of this project will also be mitigated. However, wildlife mitigation is not the focus of this document and is covered in relevant BLM permits for this project. This plan proposes the enhancement of a 3:1 ratio of impacted wetlands in accordance with US Environmental Protection Agency guidelines, plus the enhancement of riparian areas for wildlife mitigation. Included in this mitigation plan is a monitoring plan to ensure that the proposed measures are working and being maintained

  3. Facility effluent monitoring plan for the tank farms facilities

    Energy Technology Data Exchange (ETDEWEB)

    Bachand, D.D.; Crummel, G.M.

    1995-05-01

    A facility effluent monitoring plan is required by the US Department of Energy for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using specific guidelines. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years.

  4. Facility effluent monitoring plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Lavey, G.H.

    1992-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  5. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Lohrasbi, J.; Johnson, D.L.; De Lorenzo, D.S.

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  6. Facility effluent monitoring plan for the plutonium uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  7. Facility effluent monitoring plan for the plutonium uranium extraction facility

    International Nuclear Information System (INIS)

    Wiegand, D.L.

    1994-09-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  8. Facility effluent monitoring plan for the Plutonium Uranium Extraction Facility

    International Nuclear Information System (INIS)

    Greager, E.M.

    1997-01-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan will ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, at a minimum, every 3 years

  9. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    Energy Technology Data Exchange (ETDEWEB)

    Lohrasbi, J.; Johnson, D.L. [Westinghouse Hanford Co., Richland, WA (United States); De Lorenzo, D.S. [Los Alamos Technical Associates, NM (United States)

    1993-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-01. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years.

  10. Facility effluent monitoring plan for the 284-E and 284-W power plants

    International Nuclear Information System (INIS)

    Nickels, J.M.; Herman, D.R.

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  11. 40 CFR 74.61 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Monitoring plan. 74.61 Section 74.61... OPT-INS Monitoring Emissions: Combustion Sources § 74.61 Monitoring plan. (a) Monitoring plan. The... monitoring plan that includes the information required in a monitoring plan under § 75.53 of this chapter...

  12. Impact of an in-built monitoring system on family planning performance in rural Bangladesh

    Directory of Open Access Journals (Sweden)

    Ashraf Ali

    2007-06-01

    Full Text Available Abstract Background During 1982–1992, the Maternal and Child Health Family Planning (MCH-FP Extension Project (Rural of International Centre for Diarrhoeal Disease Research, Bangladesh (ICDDR,B, in partnership with the Ministry of Health and Family Welfare (MoHFW of the Government of Bangladesh (GoB, implemented a series of interventions in Sirajganj Sadar sub-district of Sirajganj district. These interventions were aimed at improving the planning mechanisms and for reviewing the problem-solving processes to build an effective monitoring system of the interventions at the local level of the overall system of the MOHFW, GoB. Methods The interventions included development and testing of innovative solutions in service-delivery, provision of door-step injectables, and strengthening of the management information system (MIS. The impact of an in-built monitoring system on the overall performance was assessed during the period from June 1995 to December 1996, after the withdrawal of the interventions in 1992. Results The results of the assessment showed that Family Welfare Assistants (FWAs increased household-visits within the last two months, and there was a higher use of service-delivery points even after the withdrawal of the interventions. The results of the cluster surveys, conducted in 1996, showed that the selected indicators of health and family-planning services were higher than those reported by the Bangladesh Demographic and Health Survey (BDHS 1996–1997. During June 1995-December, 1996, the contraceptive prevalence rate (CPR increased by 13 percentage points (i.e. from 40% to 53%. Compared to the national CPR (49%, this increase was statistically significant (p Conclusion The in-built monitoring systems, including effective MIS, accompanied by rapid assessments and review of performance by the programme managers, have potentials to improve family planning performance in low-performing areas.

  13. Facility effluent monitoring plan for the plutonium-uranium extraction facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontage, S.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  14. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2004-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problem; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) has been written to contain the rationale and design criteria for the monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document any proposed changes in the environmental monitoring program. Guidance for preparation of Environmental Monitoring Plans is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance. The plan will be effective when it is approved by the appropriate Head of Field Organization or their designee. The plan discusses major environmental monitoring and hydrology activities at the WIPP and describes the programs established to ensure that WIPP operations do not

  15. Facility Effluent Monitoring Plan for the N Reactor

    International Nuclear Information System (INIS)

    Watson, D.J.; Brendel, D.F.; Shields, K.D.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The primary purpose of the N Reactor Facility Effluent Monitoring Plan (FEMP), during standby, is to ensure that the radioactive effluents are properly monitored and evaluated for compliance with the applicable DOE orders and regulatory agencies at the federal, state, and local levels. A secondary purpose of the FEMP is to ensure that hazardous wastes are not released, in liquid effluents, to the environment even though the potential to do so is extremely low. The FEMP is to provide a monitoring system that collects representative samples in accordance with industry standards, performs analyses within stringent quality control (QC) requirements, and evaluates the data through the use of comparative analysis with the standards and acceptable environmental models

  16. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    The Conservation of Arctic Flora and Fauna (CAFF), the biodiversity working group of the Arctic Council, established the Circumpolar Biodiversity Monitoring Program (CBMP) to address the need for coordinated and standardized monitoring of Arctic environments. The CBMP includes an international...... on developing and implementing long-term plans for monitoring the integrity of Arctic biomes: terrestrial, marine, freshwater, and coastal (under development) environments. The CBMP Terrestrial Expert Monitoring Group (CBMP-TEMG) has developed the Arctic Terrestrial Biodiversity Monitoring Plan (CBMP......-Terrestrial Plan/the Plan) as the framework for coordinated, long-term Arctic terrestrial biodiversity monitoring. The goal of the CBMP-Terrestrial Plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect, understand and report on long...

  17. Rulison Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    None

    2010-07-01

    The Project Rulison Monitoring Plan has been developed as part of the U.S. Department of Energy (DOE) Office of Legacy Management's mission to protect human health and the environment. The purpose of the plan is to monitor fluids from gas wells for radionuclides that would indicate contamination is migrating from the Rulison detonation zone to producing gas wells, allowing action to be taken before the contamination could pose a risk. The Monitoring Plan (1) lists the contaminants present and identifies those that have the greatest potential to migrate from the detonation zone (radionuclide source term), (2) identifies locations that monitor the most likely transport pathways, (3) identifies which fluids will be sampled (gas and liquid) and why, (4) establishes the frequency of sampling, and (5) specifies the most practical analyses and where the analysis results will be reported. The plan does not affect the long-term hydrologic sampling conducted by DOE since 1972, which will continue for the purpose of sampling shallow groundwater and surface water near the site. The Monitoring Plan was developed in anticipation of gas wells being drilled progressively nearer the Rulison site. DOE sampled 10 gas wells in 1997 and 2005 at distances ranging from 2.7 to 7.6 miles from the site to establish background concentrations for radionuclides. In a separate effort, gas industry operators and the Colorado Oil and Gas Conservation Commission (COGCC) developed an industry sampling and analysis plan that was implemented in 2007. The industry plan requires the sampling of gas wells within 3 miles of the site, with increased requirements for wells within 1 mile of the site. The DOE plan emphasizes the sampling of wells near the site (Figure 1), specifically those with a bottom-hole location of 1 mile or less from the detonation, depending on the direction relative to the natural fracture trend of the producing formation. Studies indicate that even the most mobile

  18. Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Hunter, S.W.; Gallegos, G.M.; Surano, K.A.; Lamson, K.C.; Tate, P.J.; Balke, B.K.; Biermann, A.H.; Hoppes, W.G.; Fields, B.C.; Gouveia, F.J.; Berger, R.L.; Miller, F.S.; Rueppel, D.W.; Sims, J.M.

    1992-04-01

    The primary tasks of the environmental monitoring section (EMS) Livermore National Laboratory (LLNL) are: effluent monitoring of air, sewer, and NPDES water. Surveillance monitoring of soil, vegetation and foodstuff, water, air particulate, and air tritium. Radiation monitoring, dose assessment, emergency response, quality assurance, and reporting. This report describes LLNL and the monitoring plan

  19. Facility Effluent Monitoring Plan for the Plutonium Finishing Plant (PFP); FINAL

    International Nuclear Information System (INIS)

    FRAZIER, T.P.

    1999-01-01

    A facility effluent monitoring plan is required by the U. S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. To ensure the long-range integrity of the effluent monitoring systems, an update to this facility effluent monitoring plan is required whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document is reviewed annually even if there are no operational changes, and is updated, at a minimum, every 3 years

  20. Quality Assurance Project Plan for Facility Effluent Monitoring Plan activities

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1994-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the Facility Effluent Monitoring Plans, which are part of the overall Hanford Site Environmental Protection Plan. This plan specifically applies to the sampling and analysis activities and continuous monitoring performed for all Facility Effluent Monitoring Plan activities conducted by Westinghouse Hanford Company. It is generic in approach and will be implemented in conjunction with the specific requirements of the individual Facility Effluent Monitoring Plans

  1. Facility Effluent Monitoring Plan for the Spent Nuclear Fuel (SNF) Project

    International Nuclear Information System (INIS)

    HUNACEK, G.S.

    2000-01-01

    A facility effluent monitoring plan is required by the US. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in Westinghouse Hanford Company (WHC)-EP-0438-1, ''A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans'', and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the third revision to the original annual report. This document is reviewed annually even if there are no operational changes, and it is updated as necessary

  2. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    Energy Technology Data Exchange (ETDEWEB)

    DAVIS, W.E.

    2000-03-08

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years.

  3. Facility Effluent Monitoring Plan for the Waste Receiving and Processing (WRAP) Facility

    International Nuclear Information System (INIS)

    DAVIS, W.E.

    2000-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee public safety, or the environment. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether these systems are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan ensures long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and must be updated, as a minimum, every 3 years

  4. Mound Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Bauer, L.R.; Tullis, M.S.; Paulick, R.P.; Roush, L.L.

    1994-07-01

    The purpose of this Environmental Monitoring Plan (EMP) is to describe the environmental monitoring and surveillance programs in place at Mound. The Plan is required by DOE Order 5400.1 (DOE, 1990). The programs described in the EMP are required by the DOE 5400 Order series and by the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environment Surveillance (DOE 1991a), referred to as the Regulatory Guide throughout this Plan

  5. Facility Effluent Monitoring Plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Carter, G.J.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updates as a minimum every three years

  6. Forest communities and the Northwest Forest Plan: what socioeconomic monitoring can tell us.

    Science.gov (United States)

    Jonathan. Thompson

    2007-01-01

    The Northwest Forest Plan (the Plan) was designed to balance protection of older forest ecosystems with mitigation of impacts on rural communities and economies. It was implemented by using an adaptive management approach that featured an interagency monitoring program. This program included socioeconomic monitoring—the systematic observation and measurement of a set...

  7. Socioeconomic monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The objective of the SMMP is to document compliance with the NWPA. In order to do so, a summary description of site characterization activities based on the consultation draft of the Site Characterization Plan and the final EA is provided. Subsequent chapters identify issues related to the potential for significant adverse impacts and the monitoring plans proposed to determine whether those impacts occur. Should monitoring confirm the potential for significant adverse impact, mitigative maesures will be developed. In the context of site characterization, mitigation is defined as those changes in site characterization activities that serve to avoid or minimize, to the maximum extent practicable, any significant adverse environmental impacts. Proposed site characterization activites involve a variety of surface and subsurface activities including site preparation, access road construction and improvment, exploratory drilling and testing, geophysical surveys, geological mapping, and construction of the exploratory shaft facility. It is not anticipated that any significant adverse socioeconomic impacts will result form any of the proposed site characterization activities. However, the assessment of impacts in the EA, especially impacts related to employment and population growth, was based on assumptions concerning activities and conditions during the site characterization phase

  8. Social Impact Management Plans: Innovation in corporate and public policy

    Energy Technology Data Exchange (ETDEWEB)

    Franks, Daniel M., E-mail: d.franks@uq.edu.au [Centre for Social Responsibility in Mining, The University of Queensland, Sustainable Minerals Institute, St Lucia, Brisbane, Queensland 4072 (Australia); Vanclay, Frank, E-mail: frank.vanclay@rug.nl [Department of Cultural Geography, Faculty of Spatial Sciences, The University of Groningen, P.O. Box 800, 9700 AV Groningen (Netherlands)

    2013-11-15

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  9. Social Impact Management Plans: Innovation in corporate and public policy

    International Nuclear Information System (INIS)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and undertakes an analysis of innovations in corporate and public policy that have put in place ongoing processes – assessment, management and monitoring – to better identify the nature and scope of the social impacts that might occur during implementation and to proactively respond to change across the lifecycle of developments. Four leading practice examples are analyzed. The International Finance Corporation (IFC) Performance Standards require the preparation of Environmental and Social Management Plans for all projects financed by the IFC identified as having significant environmental and social risks. Anglo American, a major resources company, has introduced a Socio-Economic Assessment Toolbox, which requires mine sites to undertake regular assessments and link these assessments with their internal management systems, monitoring activities and a Social Management Plan. In South Africa, Social and Labour Plans are submitted with an application for a mining or production right. In Queensland, Australia, Social Impact Management Plans were developed as part of an Environmental Impact Statement, which included assessment of social impacts. Collectively these initiatives, and others, are a practical realization of theoretical conceptions of SIA that include management and monitoring as core components of SIA. The paper concludes with an analysis of the implications for the practice of impact assessment including a summary of key criteria for the design and implementation of effective SIMPs. -- Highlights: • Social impact management plans are effective strategies to manage social issues. • They are developed in partnership with regulatory agencies, investors and community.

  10. Routine Radiological Environmental Monitoring Plan. Appendices

    International Nuclear Information System (INIS)

    Bechtel Nevada

    1998-01-01

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST

  11. Facility effluent monitoring plan for the Waste Receiving and Processing Facility Module 1

    International Nuclear Information System (INIS)

    Lewis, C.J.

    1995-10-01

    A facility effluent monitoring plan is required by the US Department of Energy in Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal state, and local requirements. This facility effluent monitoring plan shall ensure lonq-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years

  12. Facility effluent monitoring plan for K area spent fuel storage basin

    International Nuclear Information System (INIS)

    Hunacek, G.S.

    1996-01-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400. 1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document was prepared using the specific guidelines identified in WHC-EP-0438-1, A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, and assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the second revision to the original annual report. Long-range integrity of the effluent monitoring system shall be ensured with updates of this report whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated at a minimum of every three years

  13. COLLABORATIVE MULTI-LEVEL PLAN MONITORING

    Directory of Open Access Journals (Sweden)

    Mohamad K. ALLOUCHE

    2011-01-01

    Full Text Available The recent worldwide connectivity and the net-centricity of military operations (coalition-based operations are witnessing an increasing need for the monitoring of plan execution for enhanced resource management and decision making. Monitoring of ongoing operations is the process of continuous observation recording and reporting. In this process the plan becomes a resource that needs to be managed effi ciently. The centralized approach to plan monitoring soon reaches its limits when plan execution is distributed across different organizations/countries. We propose a new framework that would allow different monitoring nodes distributed across the network. An effi cient propagation mechanism that allows information exchange between the different nodes would also be needed. The main purpose of this mechanism is to present the right information, to the right person, at the right time. To cope with a rapid increase of information fl ow through the network, an effi cient alarm management mechanism allows the presentation of the information with an appropriate level of details.

  14. Facility effluent monitoring plan for the tank farms facilities

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.; Kenoyer, J.L.; Moeller, M.P.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum three years. A variety of liquid wastes are generated in processing treatment, and disposal operations throughout the Hanford Site. The Tank Farms Project serves a major role in Hanford Site waste management activities as the temporary repository for these wastes. Stored wastes include hazardous components regulated under the Resource Conservation and Recovery Act of 1976 (RCRA) and as by-product material regulated under the Atomic Energy Act of 1954. A total of 177 single- and double-shell tanks (SST and DST) have been constructed in the 200 East and 200 West Areas of the Hanford Site. These facilities were constructed to various designs from 1943 to 1986. The Tank Farms Project is comprised of these tanks along with various transfer, receiving, and treatment facilities

  15. Environmental monitoring plan - environmental monitoring section. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Wilt, G.C. [ed.; Tate, P.J.; Brigdon, S.L. [and others

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures.

  16. Environmental monitoring plan - environmental monitoring section. Revision 1

    International Nuclear Information System (INIS)

    Wilt, G.C.; Tate, P.J.; Brigdon, S.L.

    1994-11-01

    This report presents the environmental monitoring plan for the Lawrence Livermore National Laboratory. A site characterization is provided along with monitoring and measurement techniques and quality assurance measures

  17. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    International Nuclear Information System (INIS)

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) of riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period

  18. Facility effluent monitoring plan for the 300 Area Fuels Fabrication Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Brendel, D.F.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring system by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The Fuel Fabrication Facility in the Hanford 300 Area supported the production reactors from the 1940's until they were shut down in 1987. Prior to 1987 the Fuel Fabrication Facility released both airborne and liquid radioactive effluents. In January 1987 the emission of airborne radioactive effluents ceased with the shutdown of the fuels facility. The release of liquid radioactive effluents have continued although decreasing significantly from 1987 to 1990

  19. Environmental monitoring and mitigation plan for site characterization: Revision 1

    International Nuclear Information System (INIS)

    1988-01-01

    The purpose of the EMMP is: to identify, in consultation with the affected states and Indian tribes, potentially significant adverse environmental impacts that could result from site characterization activities, to describe data collection methods that will be used to monitor any such identified impacts, and procedures for mitigating them. Chapter 2 of the EMMP provides an overview of the background and scope of the document. Chapter 3 of the EMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construct the exploratory shafts and surface support facilities. The rationale for developing environmental monitoring studies is presented in Chapeter 4. Chapter 5 contains descriptions of the environmental monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the EMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 21 figs., 10 tabs

  20. Environmental Monitoring Plan, Sandia National Laboratories, Livermore

    International Nuclear Information System (INIS)

    Holland, R.C.

    1992-06-01

    This Environmental Monitoring Plan was written to fulfill the requirements of DOE Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories, Livermore. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 61 refs

  1. Golden Eagle Monitoring Plan for the Desert Renewable Energy Conservation Plan

    Science.gov (United States)

    Wiens, David; Kolar, Patrick; Katzner, Todd

    2018-01-01

    This report describes options for monitoring the status and population trends of the golden eagle (Aquila chrysaetos) within the Desert Renewable Energy Conservation Plan (DRECP) area of Southern California in maintaining stable or increasing population in the planning area. The report profiles the ecology of golden eagles in the region and provides a range of potential sampling options to address monitoring needs and objectives. This approach also focused on links between changes in human land-use, golden eagle nesting and foraging habitat conditions, and population dynamics. The report outlines how monitoring data from demographic, prey, and habitat studies were used to develop a predictive demographic model for golden eagles in the DRECP area. Results from the model simulations suggest increases in renewable energy development could have negative consequences for population trajectories. Results also suggest site-specific conservation actions could reduce the magnitude of negative impacts to the local population of eagles. A monitoring framework is proposed including: (1) annual assessments of site-occupancy and reproduction by territorial pairs of golden eagles (including rates at which sites become colonized or vacated over time); (2) estimates of survival, movements, and intensity of use of landscapes by breeding and non-breeding golden eagles; (3) periodic (conducted every two to four years) assessments of nesting and foraging habitats, prey populations, and associations with land-use and management activities; and (4) updating the predictive demographic model with new information obtained on eagles and associated population stressors. The results of this research were published in the Journal of Rapture Research, Wiens, David,Inman, Rich D., Esque, Todd C., Longshore, Kathleen M. and Nussear, Kenneth (2017). Spatial Demographic Models to Inform Conservation Planning of Golden Eagles in Renewable Energy Landscapes. 51(3):234-257.

  2. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Newcomer, D.R.; Thornton, E.C.; Hartman, M.J.; Dresel, P.E.

    1999-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954 the Resource Conservation and Recovery Act of 1976 the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The US Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/frequency matrix for the entire site. The objectives of monitoring fall into three general categories plume and trend tracking, treatment/storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  3. Facility effluent monitoring plan for the uranium trioxide facility

    International Nuclear Information System (INIS)

    Thompson, R.J.; Sontag, S.

    1991-11-01

    A facility effluent monitoring plant is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The UO 3 Plant is located in the south-central portion of the 200 West Area of the Hanford Site. The plant consists of two primary processing buildings and several ancillary facilities. The purpose of the UO 3 Plant is to receive uranyl nitrate hexahydrate (UNH) from the Plutonium-Uranium Extraction (PUREX) Plant, concentrate it, convert the UNH to uranium trioxide (UO 3 ) powder by calcination and package it for offsite shipment. The UO 3 Plant has been placed in a standby mode. There are two liquid discharges, and three gaseous exhaust stacks, and seven building exhausters that are active during standby conditions

  4. MCO Monitoring Plan

    International Nuclear Information System (INIS)

    SEXTON, R.A.

    2000-01-01

    The basis for development of the Multi-Canister Overpack (MCO) Monitoring Plan was established in HNF-3312, MCO Monitoring Activity Description (Sexton 1998), with the following specific objectives: The safety of Spent Nuclear Fuel (SNF) Project processes for retrieving, packaging, handling, conditioning, and storing the N Reactor spent nuclear fuel has been demonstrated by conservative analyses, as compiled in the project safety basis and licensing documentation. Appropriate quality assurance and independent checking of engineering, fabrication, and construction are being applied, and there will be in-process monitoring and verification of MCO loading and conditioning actions. Once the MCOs have been placed in storage, there is no safety requirement, regulatory requirement, or precedent to monitor them. Although not required, a monitoring program which would acquire data for use by Process Engineering is considered valuable for several reasons (Sexton 1998): Good engineering practice--Acquiring data at a reasonable cost that may be useful in developing a fuller understanding of the behavior of an engineered system is good engineering practice. Actual data on full scale MCOs is otherwise unavailable--Previous investigations have been limited to small fuel samples or simulant prototypes and have been relatively short in duration. MCO monitoring can provide data on large loads of actual fuel, in full-scale configuration, over longer time periods. Additional knowledge of the fuel type may prove valuable in future analyses or applications. On that basis, a program with two components was planned: The pressure/temperature/gas composition relationships will be observed in a limited number of MCOs during the first two years in storage. The remaining MCOs will incorporate a simple means to confirm at any time in the future, that internal pressure of the MCO is not high enough to threaten its structural integrity. The MCOs are likely to be stored for 40 years or longer

  5. Integrated Monitoring Plan for the Hanford Groundwater Monitoring Project

    International Nuclear Information System (INIS)

    Hartman, Mary J.; Dresel, P. Evan; Lindberg, Jon W.; Newcomer, Darrell R.; Thornton, Edward C.

    2000-01-01

    Groundwater is monitored at the Hanford Site to fulfill a variety of state and federal regulations, including the Atomic Energy Act of 1954; the Resource Conservation and Recovery Act of 1976; the Comprehensive Environmental Response, Compensation, and Liability Act of 1980; and Washington Administrative Code. Separate monitoring plans are prepared for various requirements, but sampling is coordinated and data are shared among users to avoid duplication of effort. The U.S. Department of Energy manages these activities through the Hanford Groundwater Monitoring Project. This document is an integrated monitoring plan for the groundwater project. It documents well and constituent lists for monitoring required by the Atomic Energy Act of 1954 and its implementing orders; includes other, established monitoring plans by reference; and appends a master well/constituent/ frequency matrix for the entire site. The objectives of monitoring fall into three general categories: plume and trend tracking, treatment/ storage/disposal unit monitoring, and remediation performance monitoring. Criteria for selecting Atomic Energy Act of 1954 monitoring networks include locations of wells in relation to known plumes or contaminant sources, well depth and construction, historical data, proximity to the Columbia River, water supplies, or other areas of special interest, and well use for other programs. Constituent lists were chosen based on known plumes and waste histories, historical groundwater data, and, in some cases, statistical modeling. Sampling frequencies were based on regulatory requirements, variability of historical data, and proximity to key areas. For sitewide plumes, most wells are sampled every 3 years. Wells monitoring specific waste sites or in areas of high variability will be sampled more frequently

  6. Biological monitoring and abatement program plan for Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R.; Phipps, T.L.

    1997-06-01

    The overall purpose of this plan is to evaluate the receiving streams' biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL

  7. Biological monitoring and abatement program plan for Oak Ridge National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Kszos, L.A.; Anderson, G.E.; Gregory, S.M.; Peterson, M.J.; Ryon, M.G.; Schilling, E.M.; Smith, J.G.; Southworth, G.R. [Oak Ridge National Lab., TN (United States); Phipps, T.L. [CKY, Inc., Oak Ridge, TN (United States)

    1997-06-01

    The overall purpose of this plan is to evaluate the receiving streams` biological communities for the duration of the permit and meet the objectives for the ORNL BMAP as outlined in the NPDES permit (Appendix). The ORNL BMAP will focus on those streams in the WOC watershed that (1) receive NPDES discharges and (2) have been identified as ecologically impacted. In response to the newly issued NPDES permit, the tasks that are included in this BMAP plan include monitoring biological communities (fish and benthic invertebrates), monitoring mercury contamination in fish and water, monitoring polychlorinated biphenyl (PCB) contamination in fish, and evaluating temperature loading from ORNL outfalls. The ORNL BMAP will evaluate the effects of sediment and oil and grease, as well as the chlorine control strategy through the use of biological community data. Monitoring will be conducted at sites in WOC, First Creek, Fifth Creek, Melton Branch, and WOL.

  8. Routine Radiological Environmental Monitoring Plan, Volume 2 Appendices

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada

    1998-12-31

    Supporting material for the plan includes: QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS AIR; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR WATER ON AND OFF THE NEVADA TEST SITE; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR NTS BIOTA; QUALITY ASSURANCE, ANALYSIS, AND SAMPLING PLAN FOR DIRECT RADIATION MONITORING; DATA QUALITY OBJECTIVES PROCESS; VADOSE ZONE MONITORING PLAN CHECKLIST.

  9. An integrated approach to the Environmental Monitoring Plan of the Pertuso spring (Upper Valley of Aniene River

    Directory of Open Access Journals (Sweden)

    Giuseppe Sappa

    2014-06-01

    Full Text Available Quantitative assessment of groundwater and surface water is an important tool for sustainable management and protection of these important resources. This paper deals with the design of a multi-disciplinary monitoring plan related to the catchment project of the Pertuso spring, in the Upper Valley of Aniene River, which is going to be exploited to supply an important water network in the South part of Roma district. According to the Legislative Decree 152/2006, as modified by DM 260/2010, any infrastructure design should take in consideration an Environmental Monitoring Plan for the hydrogeological settings of the study area. Thus, the hydrogeological characterization combined with an Environmental Monitoring Plan provides to evaluate the potential adverse environmental impacts due catchment works. For water resources assessment and management, the quantification of groundwater recharge is a preliminary step. As a matter of fact, it has been included the quantitative characterization of the Pertuso spring, in the aim of to protect catchment area, which is directly affect by the natural hydrogeological balance of this aquifer. Thus, a multi-disciplinary monitoring plan has been set up, including quantitative and hydrogeochemical measurements, both for groundwater and surface water of the Upper Valley of Aniene River. The target of this Environmental Monitoring Plan is to set up the background framework on the hydromorphological, physico-chemical and biological properties of water resources in the water basin influenced aim by any potential environmental impact due to the construction activities. The Environmental Monitoring Plan and main features of the monitoring network will be presented in this study.

  10. Oak Ridge Y-12 Plant Biological Monitoring and Abatement Program Plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Christensen, S.W.; Greeley, M.S.JR.; Hill, W.R.; Peterson, M.J.; Ryon, M.G.; Smith, J.G.; Southworth, G.R.; Stewart, A.J.

    2000-09-01

    The revised Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted as required by the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995 and became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Science Division (ESD) at the Oak Ridge National Laboratory (ORNL) at the request of the Y-12 Plant. The revision to the BMAP plan is based on results of biological monitoring conducted during the period of 1985 to present. Details of the specific procedures used in the current routine monitoring program are provided; experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional bioaccumulation monitoring if results indicate unexpectedly high PCBs or Hg) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is still observed). The program scope will be re-evaluated annually. By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of Y-12 Plant operations (past and present) on the biota of EFPC and to document the ecological effects of remedial actions.

  11. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    2008-01-01

    U.S. Department of Energy (DOE) Order 450.1, Environmental Protection Program, requires each DOE site to conduct environmental monitoring. Environmental monitoring at the Waste Isolation Pilot Plant (WIPP) is conducted in order to: (a) Verify and support compliance with applicable federal, state, and local environmental laws, regulations, permits, and orders; (b) Establish baselines and characterize trends in the physical, chemical, and biological condition of effluent and environmental media; (c) Identify potential environmental problems and evaluate the need for remedial actions or measures to mitigate the problems; (d) Detect, characterize, and report unplanned releases; (e) Evaluate the effectiveness of effluent treatment and control, and pollution abatement programs; and (f) Determine compliance with commitments made in environmental impact statements, environmental assessments, safety analysis reports, or other official DOE documents. This Environmental Monitoring Plan (EMP) explains the rationale and design criteria for the environmental monitoring program, extent and frequency of monitoring and measurements, procedures for laboratory analyses, quality assurance (QA) requirements, program implementation procedures, and direction for the preparation and disposition of reports. Changes to the environmental monitoring program may be necessary to allow the use of advanced technology and new data collection techniques. This EMP will document changes in the environmental monitoring program. Guidance for preparation of EMPs is contained in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  12. Facility effluent monitoring plan for 242-A Evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1993-03-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility effluent Monitoring Plans, WHC-EP-0438-1**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  13. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    International Nuclear Information System (INIS)

    T. Haney R. VanHorn

    2007-01-01

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used to determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality

  14. Long-Term Ecological Monitoring Field Sampling Plan for 2007

    Energy Technology Data Exchange (ETDEWEB)

    T. Haney

    2007-07-31

    This field sampling plan describes the field investigations planned for the Long-Term Ecological Monitoring Project at the Idaho National Laboratory Site in 2007. This plan and the Quality Assurance Project Plan for Waste Area Groups 1, 2, 3, 4, 5, 6, 7, 10, and Removal Actions constitute the sampling and analysis plan supporting long-term ecological monitoring sampling in 2007. The data collected under this plan will become part of the long-term ecological monitoring data set that is being collected annually. The data will be used t determine the requirements for the subsequent long-term ecological monitoring. This plan guides the 2007 investigations, including sampling, quality assurance, quality control, analytical procedures, and data management. As such, this plan will help to ensure that the resulting monitoring data will be scientifically valid, defensible, and of known and acceptable quality.

  15. Facility effluent monitoring plan for 242-A evaporator facility

    International Nuclear Information System (INIS)

    Crummel, G.M.; Gustavson, R.D.

    1995-02-01

    A facility effluent monitoring plan is required by the U.S. Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation showed the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438-1. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated, as a minimum, every three years

  16. The circumpolar biodiversity monitoring program - Terrestrial plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    , northern communities, and scientists to detect, understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity. This presentation will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based...... monitoring with survey-based monitoring and remotely sensed data. The CBMP Terrestrial Plan intends to build upon and expand existing monitoring networks, engaging participants across a range of capacity and interests. The presentation will summarize the recommended focal soil ecosystem components...... and attributes to monitor in the plan related to soil invertebrates. Focal Ecosystem Components (FECs) of the soil decomposer system include the soil living invertebrates such as microarthropods, enchytraeids and earthworms and the functions performed by microorganisms such as nitrification, decomposition...

  17. OAK RIDGE Y-12 PLANT BIOLOGICAL MONITORING AND ABATEMENT PROGRAM (BMAP) PLAN

    Energy Technology Data Exchange (ETDEWEB)

    ADAMS, S.M.; BRANDT, C.C.; CHRISTENSEN, S.W.; CICERONE, D.S.; GREELEY, M.S.JR; HILL, W.R.; HUSTON, M.S.; KSZOS, L.A.; MCCARTHY, J.F.; PETERSON, M.J.; RYON, M.G.; SMITH, J.G.; SOUTHWORTH, G.R.; STEWART, A.J.

    1998-10-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y- 12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas (e.g., additional toxicity testing if initial results indicate low survival or reproduction) or a reduction in sampling intensity in others (e.g., reduction in the number of sampling sites when no impact is observed). By using the results of previous monitoring efforts to define the current program and to guide us in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  18. Socioeconomic monitoring and mitigation plan for the Salt Repository Project Site, Deaf Smith County, Texas: Revision 5: Draft

    International Nuclear Information System (INIS)

    1988-03-01

    The purpose of the Socioeconomic Monitoring and Mitigation Plan (SMMP) is to identify, in consultation with the affected States and Indian Tribes, potentially significant adverse socioeconomic impacts that could result from site characterization activities, to describe approaches that will be used to monitor any such identified impacts, and to describe procedures for mitigating them. Chapter 3 of the SMMP provides a description of site characterization phase activities planned to assess the geologic condition of the site and construction the exploratory shafts and surface support facilities. The rationale for developing socioeconomic monitoring studies is presented in Chapter 4. Chapter 5 contains descriptions of the socioeconomic monitoring and mitigation procedures whenever they are applicable. Additionally, in Chapter 6, the SMMP includes a procedure for modifying the monitoring and mitigation program and an approach for reporting monitoring results to interested parties. 8 refs., 20 figs., 4 tabs

  19. Environmental Monitoring Plan - February 2016

    Energy Technology Data Exchange (ETDEWEB)

    Gallegos, G. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertoldo, N. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Blake, R. G. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fish, C. B. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Grayson, A. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Griffin, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Jones, H. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Patterson, L. E. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Revelli, M. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Rosene, C. A. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Wegrecki, T M; Williams, R A; Wilson, K R

    2016-02-08

    The purpose of environmental monitoring is to promote the early identification of, and response to, potential adverse environmental impacts associated with Lawrence Livermore National Laboratory (LLNL) operations. Environmental monitoring supports the Integrated Safety Management System (ISMS), International Organization for Standardization (ISO) 14001 Environmental Management Systems standard, and U. S. Department of Energy (DOE) Order 458.1, Radiation Protection oft/ic Pubile and the Environment. Specifically, environmental monitoring enables LLNL to detect, characterize, and respond to releases from LLNL activities; assess impacts; estimate dispersal patterns in the environment; characterize the pathways of exposure to members of the public; characterize the exposures and doses to individuals and to the population; and to evaluate the potential impacts to the hiota in the vicinity of LLNL. Environmental monitoring is also a major component of compliance demonstration for permits and other regulatory requirements.

  20. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    International Nuclear Information System (INIS)

    1994-01-01

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations

  1. Environmental Monitoring Plan, United States Department of Energy, Richland Operations Office. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-11-09

    This report describes environmental monitoring activities at Hanford Reservation. Attention is focused on effluent monitoring and environmental surveillance. All Hanford contractors reviewed potential sources of contamination. A facility effluent monitoring plan was written for each facility with the potential to release significant quantities of hazardous materials, addressing both radiological and nonradiological effluent monitoring. The environmental surveillance program assesses onsite and offsite environmental impacts and offsite human health exposures. The program monitors air, surface water, sediment, agricultural products, vegetation, soil, and wildlife. In addition, independent onsite surveillance is conducted to evaluate the effectiveness of Hanford Site effluent controls in order to comply with applicable environmental standards and regulations.

  2. Monitoring and evaluation plan for the Nez Perce Tribal Hatchery

    Energy Technology Data Exchange (ETDEWEB)

    Steward, C.R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan, the 1995 Supplement to the Master Plan, and the Nez Perce Tribal Hatchery Program Environmental Impact Statement. The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts.

  3. Facility effluent monitoring plan determinations for the 200 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-11-01

    The following facility effluent monitoring plan determinations document the evaluations conducted for the Westinghouse Hanford Company 200 Area facilities (chemical processing, waste management, 222-S Laboratory, and laundry) on the Hanford Site in south central Washington State. These evaluations determined the need for facility effluent monitoring plans for the 200 Area facilities. The facility effluent monitoring plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438 (WHC 1991). The Plutonium/Uranium Extraction Plant and UO 3 facility effluent monitoring plan determinations were prepared by Los Alamos Technical Associates, Richland, Washington. The Plutonium Finishing Plant, Transuranic Waste Storage and Assay Facility, T Plant, Tank Farms, Low Level Burial Grounds, and 222-S Laboratory determinations were prepared by Science Applications International Corporation of Richland, Washington. The B Plant Facility Effluent Monitoring Plan Determination was prepared by ERCE Environmental Services of Richland, Washington

  4. Healy Clean Coal Project, Healy, Alaska final Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-14

    This Environmental Monitoring Plan (EMP) provides the mechanism to evaluate the integrated coal combustion/emission control system being demonstrated by the Healy Clean Coal Project (HCCP) as part-of the third solicitation of the US Department of Energy (DOE) Clean Coal Technology Demonstration Program (CCT-III). The EMP monitoring is intended to satisfy two objectives: (1) to develop the information base necessary for identification, assessment, and mitigation of potential environmental problems arising from replication of the technology and (2) to identify and quantify project-specific and site-specific environmental impacts predicted in the National Environmental Policy Act (NEPA) documents (Environmental Impact Statement and Record of Decision). The EMP contains a description of the background and history of development of the project technologies and defines the processes that will take place in the combustion and spray dryer absorber systems, including the formation of flash-calcined material (FCM) and its use in sulfur dioxide (SO{sub 2}) removal from the flue gases. It also contains a description of the existing environmental resources of the project area. The EMP includes two types of environmental monitoring that are to be used to demonstrate the technologies of the HCCP: compliance monitoring and supplemental monitoring. Compliance monitoring activities include air emissions, wastewater effluents, and visibility. Monitoring of these resources provide the data necessary to demonstrate that the power plant can operate under the required state and federal statutes, regulations, and permit requirements.

  5. Monitor of spatial plans. Feasibility study

    International Nuclear Information System (INIS)

    Bollen, M.J.S.; Ritsema van Eck, J.; Farjon, J.M.J.

    2008-01-01

    The national government needs assessments of consequences of building projects in relation to spatial policy objectives such as the prevention of urban sprawl or the development of landscape qualities. Normally the effects of spatial policies appear after several years. Spatial plans can possibly indicate these effects earlier. To allow policies to be adapted to unwanted developments, the assessments should be available in the early planning stages of these building projects. The Dutch Minister of VROM has asked the Netherlands Environmental Assessment Agency to investigate the feasibility of a monitoring system based on building plans. As building projects take a long period from conception until realization, a monitoring system for these projects should include all plans for the next ten to fifteen years with an indication of the chance that these plans are realized. The existing databases in the Netherlands provide sufficient information to assess consequences of plans for those objectives that are directly related to the urbanization pattern. However, an improvement of these databases is necessary, amongst other things by coordination of these databases [nl

  6. 2002 WIPP Environmental Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Washington TRU Solutions LLC

    2002-09-30

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance.

  7. Facility effluent monitoring plan for the fast flux test facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Dahl, N.R.

    1992-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in US Department of Energy Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could affect employee or public safety or the environment. A Facility Effluent Monitoring Plan determination was performed during calendar year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  8. A guide for preparing Hanford Site facility effluent monitoring plans

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1992-06-01

    This document provides guidance on the format and content of effluent monitoring plans for facilities at the Hanford Site. The guidance provided in this document is designed to ensure compliance with US Department of Energy (DOE) Orders 5400.1 (DOE 1988a), 5400.3 (DOE 1989a), 5400.4 (DOE 1989b), 5400.5 (DOE 1990a), 5480.1 (DOE 1982), 5480.11 (DOE 1988b), and 5484.1 (DOE 1981). These require environmental monitoring plans for each site, facility, or process that uses, generates, releases, or manages significant pollutants of radioactive or hazardous materials. In support of DOE Orders 5400.5 (Radiation Protection of the Public and the Environment) and 5400.1 (General Environmental Protection Program), the DOE Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE 1991) should be used to establish elements of a radiological effluent monitoring program in the Facility Effluent Monitoring Plan. Evaluation of facilities for compliance with the US Environmental Protection Agency Clean Air Act of 1977 requirements also is included in the airborne emissions section of the Facility Effluent Monitoring Plans. Sampling Analysis Plans for Liquid Effluents, as required by the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), also are included in the Facility Effluent Monitoring Plans. The Facility Effluent Monitoring Plans shall include complete documentation of gaseous and liquid effluent sampling and monitoring systems

  9. Near-facility environmental monitoring quality assurance project plan

    International Nuclear Information System (INIS)

    McKinney, S.M.

    1997-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near facility environmental monitoring performed by Waste Management Federal Services, Inc., Northwest Operations and supersedes WHC-EP-0538-2. This plan applies to all sampling and monitoring activities performed by waste management Federal Services, Inc., Northwest Operations in implementing facility environmental monitoring at the Hanford Site

  10. The Circumpolar Biodiversity Monitoring Program Terrestrial Plan

    DEFF Research Database (Denmark)

    Christensen, Tom; Payne, J.; Doyle, M.

    , understand and report on long-term change in Arctic terrestrial ecosystems and biodiversity, and to identify knowledge gaps and priorities. This poster will outline the key management questions the plan aims to address and the proposed nested, multi-scaled approach linking targeted, research based monitoring...... and coastal environments. The CBMP Terrestrial Plan is a framework to focus and coordinate monitoring of terrestrial biodiversity across the Arctic. The goal of the plan is to improve the collective ability of Arctic traditional knowledge (TK) holders, northern communities, and scientists to detect...

  11. Ranch business planning and resource monitoring for rangeland sustainability

    Science.gov (United States)

    Kristie A. Maczko; John A. Tanaka; Michael Smith; Cindy Garretson-Weibel; Stanley F. Hamilton; John E. Mitchell; Gene Fults; Charles Stanley; Dick Loper; Larry D. Bryant; J. K. (Rooter) Brite

    2012-01-01

    Aligning a rancher's business plan goals with the capability of the ranch's rangeland resources improves the viability and sustainability of family ranches. Strategically monitoring the condition of soil, water, vegetation, wildlife, livestock production, and economics helps inform business plan goals. Business planning and resource monitoring help keep...

  12. Environmental monitoring plan for the Oak Ridge Reservation

    International Nuclear Information System (INIS)

    1992-09-01

    The Environmental Monitoring Plan (EMP) for the Oak Ridge Reservation (ORR) is an omnibus document providing a single point of reference for the effluent monitoring and environmental surveillance programs of Oak Ridge National Laboratory (ORNL), Y-12 Plant, K-25 Site, and ORR areas outside specific facility boundaries. Authorization and requirement for the EMP are contained in Department of Energy (DOE) Order 5400.1 Chapter 4, which states that environmental monitoring consists of two major activities: effluent monitoring and environmental surveillance. This EMP is intended to document the rationale and design criteria for the effluent monitoring and environmental surveillance programs, extent and frequency of sampling and analysis, analytical laboratory procedures, quality assurance, implementation, and reporting. The EMP describes one of several programs that collect and analyze data to assess the impacts of ORR on the environment and human health. Others include the Environmental Restoration Program and the Clinch River Remedial Investigation Program. While the ultimate goal for DOE may be to integrate information from all these programs into a formalized assessment of risk to ecosystems and human health, that level of integration is beyond the scope of the EMP. The EMP outlines the goals of environmental monitoring for the ORR and its facilities and includes activities that are not presently conducted. In general, the programs described in this EMP represent an increase in surveillance activities over past practices

  13. 2009 review of the Deep Panuke Environmental Effects Monitoring Plan

    International Nuclear Information System (INIS)

    2010-01-01

    The Oceans, Habitat and Species at Risk branch of the Department of Fisheries and Oceans Canada requested an update to the Environmental Management Plan for the construction of the Deep Panuke Project. Specifically, it requested expert advice on the 2009-2010 Drilling Environmental Protection Plan/Environmental Effects Monitoring Plan (EPP/EEMP), which outlines the measures that EnCana proposes take to avoid or minimize the effects of drilling in the marine environment. Although the proposed approach was deemed to be sufficient, the EPP/EEMP did not make reference to the potential effects of noise on marine species. The jack-up rig mobile offshore production unit that is proposed for well drilling and well re-entries was considered to produce lower noise levels than drillships and semi submersibles. It was concluded that jack up drilling at Deep Panuke would not likely require special noise mitigation measures, but more extensive measurement and documentation of acoustic noise levels around active rigs is recommended. The risk of well blowout or collapse was deemed low. Should such an event occur, the impact of the released hydrocarbon condensate would depend on the rate and duration of the release. Under typical conditions, the proponent's models reasonably show the blowout discharge drifting away from Sable Island. However, there is a very low risk that certain weather conditions would result in an oil spill reaching Sable Island. The EPP/EEMP does not address species at risk in any way, and mitigation measures are required and should be detailed in the monitoring plan. It was concluded that the proposed EPP/EEMP is sufficient in many areas, but since most mitigation measures are based on theoretical considerations alone, a plan for field monitoring at the drilling site is needed. 3 refs.

  14. Groundwater Monitoring Plan for the Solid Waste Landfill

    International Nuclear Information System (INIS)

    Lindberg, J.W.; Chou, C.J.

    2000-01-01

    The Solid Waste Landfill (SWL) is regulated by the Washington State Department of Ecology under WAC 173-304. Between 1973 and 1976, the landfill received primarily paper waste and construction debris, but it also received asbestos, sewage, and catch tank liquid waste. Groundwater monitoring results indicate the SWL has contaminated groundwater with volatile organic compounds and possibly metals at levels that exceed regulatory limits. DynCorp, Tri-Cities, Inc. operates the facility under an interim closure plan (final closure plan will be released shortly). Pacific Northwest National Laboratory (PNNL) monitors groundwater at the site. This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis. Existing wells in the current monitoring network only monitor the uppermost portion of the upper-most aquifer. Therefore, two new downgradient wells and one existing upgradient well are proposed to determine whether groundwater waste constituents have reached the lower portion of the uppermost aquifer. The proposed well network includes three upgradient wells and ten downgradient wells. The wells will be sampled quarterly for 14 analytes required by WAC 173-304-490 plus volatile organic compounds and filtered arsenic as site-specific analytes

  15. Groundwater Monitoring Plan for the Solid Waste Landfill

    Energy Technology Data Exchange (ETDEWEB)

    JW Lindberg; CJ Chou

    2000-12-14

    The Solid Waste Landfill (SWL) is regulated by the Washington State Department of Ecology under WAC 173-304. Between 1973 and 1976, the landfill received primarily paper waste and construction debris, but it also received asbestos, sewage, and catch tank liquid waste. Groundwater monitoring results indicate the SWL has contaminated groundwater with volatile organic compounds and possibly metals at levels that exceed regulatory limits. DynCorp, Tri-Cities, Inc. operates the facility under an interim closure plan (final closure plan will be released shortly). Pacific Northwest National Laboratory (PNNL) monitors groundwater at the site. This monitoring plan includes well and constituent lists, and summarizes sampling, analytical, and quality control requirements. Changes from the previous monitoring plan include elimination of two radionuclides from the analyte list and some minor changes in the statistical analysis. Existing wells in the current monitoring network only monitor the uppermost portion of the upper-most aquifer. Therefore, two new downgradient wells and one existing upgradient well are proposed to determine whether groundwater waste constituents have reached the lower portion of the uppermost aquifer. The proposed well network includes three upgradient wells and ten downgradient wells. The wells will be sampled quarterly for 14 analytes required by WAC 173-304-490 plus volatile organic compounds and filtered arsenic as site-specific analytes.

  16. Active sites environmental monitoring Program - Program Plan: Revision 2

    International Nuclear Information System (INIS)

    Morrissey, C.M.; Hicks, D.S.; Ashwood, T.L.; Cunningham, G.R.

    1994-05-01

    The Active Sites Environmental Monitoring Program (ASEMP), initiated in 1989, provides early detection and performance monitoring of active low-level-waste (LLW) and transuranic (TRU) waste facilities at Oak Ridge National Laboratory (ORNL). Several changes have recently occurred in regard to the sites that are currently used for waste storage and disposal. These changes require a second set of revisions to the ASEMP program plan. This document incorporates those revisions. This program plan presents the organization and procedures for monitoring the active sites. The program plan also provides internal reporting levels to guide the evaluation of monitoring results

  17. Impacted material placement plans

    International Nuclear Information System (INIS)

    Hickey, M.J.

    1997-01-01

    Impacted material placement plans (IMPP) are documents identifying the essential elements in placing remediation wastes into disposal facilities. Remediation wastes or impacted material(s) are those components used in the construction of the disposal facility exclusive of the liners and caps. The components might include soils, concrete, rubble, debris, and other regulatory approved materials. The IMPP provides the details necessary for interested parties to understand the management and construction practices at the disposal facility. The IMPP should identify the regulatory requirements from applicable DOE Orders, the ROD(s) (where a part of a CERCLA remedy), closure plans, or any other relevant agreements or regulations. Also, how the impacted material will be tracked should be described. Finally, detailed descriptions of what will be placed and how it will be placed should be included. The placement of impacted material into approved on-site disposal facilities (OSDF) is an integral part of gaining regulatory approval. To obtain this approval, a detailed plan (Impacted Material Placement Plan [IMPP]) was developed for the Fernald OSDF. The IMPP provides detailed information for the DOE, site generators, the stakeholders, regulatory community, and the construction subcontractor placing various types of impacted material within the disposal facility

  18. 1999 vadose zone monitoring plan and guidance for subsequent years

    International Nuclear Information System (INIS)

    Horton, D.G.; Reidel, S.P.; Last, G.V.

    1998-08-01

    The US Department of Energy's Hanford Site has the most diverse and largest amounts of radioactive waste in the US. The majority of the liquid waste was disposed to the soil column where much of it remains today. This document provides the rationale and general framework for vadose zone monitoring at cribs, ditches, trenches and other disposal facilities to detect new sources of contamination and track the movement of existing contamination in the vadose zone for the protection of groundwater. The document provides guidance for subsequent site-specific vadose zone monitoring plans and includes a brief description of past vadose monitoring activities (Chapter 3); the results of the Data Quality Objective process used for this plan (Chapter 4); a prioritization of liquid waste disposal sites for vadose monitoring (Chapter 5 and Appendix B); a general Monitoring and Analysis Plan (Chapter 6); a general Quality Assurance Project Plan (Appendix A), and a description of vadose monitoring activities planned for FY 1999 (Appendix C)

  19. Facility effluent monitoring plan determinations for the 400 Area facilities

    International Nuclear Information System (INIS)

    Nickels, J.M.

    1991-09-01

    This Facility Effluent Monitoring Plan determination resulted from an evaluation conducted for the Westinghouse Hanford Company 400 Area facilities on the Hanford Site. The Facility Effluent Monitoring Plan determinations have been prepared in accordance with A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans. Two major Westinghouse Hanford Company facilities in the 400 Area were evaluated: the Fast Flux Test Facility and the Fuels Manufacturing and examination Facility. The determinations were prepared by Westinghouse Hanford Company. Of these two facilities, only the Fast Flux Test Facility will require a Facility Effluent Monitoring Plan. 7 refs., 5 figs., 4 tabs

  20. Facility Effluent Monitoring Plan for the 284-E and 284-W power plants

    International Nuclear Information System (INIS)

    Herman, D.R.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1 for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP- 0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updated as a minimum every three years. The 284-E and 284-W Power Plants are coal-fired plants used to generate steam. Electricity is not generated at these facilities. The maximum production of steam is approximately 159 t (175 tons)/h at 101 kg (225 lb)/in 2 . Steam generated at these facilities is used in other process facilities (i. e., the B Plant, Plutonium-Uranium Extraction Plant, 242-A Evaporator) for heating and process operations. The functions or processes associated with these facilities do not have the potential to generate radioactive airborne effluents or radioactive liquid effluents, therefore, radiation monitoring equipment is not used on the discharge of these streams. The functions or processes associated with the production of steam result in the use, storage, management and disposal of hazardous materials

  1. Near-Facility Environmental Monitoring Quality Assurance Project Plan

    International Nuclear Information System (INIS)

    MCKINNEY, S.M.

    2000-01-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for the activities associated with the preoperational and near-facility environmental monitoring directed by Waste Management Technical Services and supersedes HNF-EP-0538-4. This plan applies to all sampling and monitoring activities performed by Waste Management Technical Services in implementing near-facility environmental monitoring at the Hanford Site. This Quality Assurance Project Plan is required by U.S. Department of Energy Order 5400.1 (DOE 1990) as a part of the Environmental Monitoring Plan (DOE-RL 1997) and is used to define: Environmental measurement and sampling locations used to monitor environmental contaminants near active and inactive facilities and waste storage and disposal sites; Procedures and equipment needed to perform the measurement and sampling; Frequency and analyses required for each measurement and sampling location; Minimum detection level and accuracy; Quality assurance components; and Investigation levels. Near-facility environmental monitoring for the Hanford Site is conducted in accordance with the requirements of U.S. Department of Energy Orders 5400.1 (DOE 1990), 5400.5 (DOE 1993), 5484.1 (DOE 1990), and 435.1 (DOE 1999), and DOE/EH-O173T (DOE 1991). It is Waste Management Technical Services' objective to manage and conduct near-facility environmental monitoring activities at the Hanford Site in a cost-effective and environmentally responsible manner that is in compliance with the letter and spirit of these regulations and other environmental regulations, statutes, and standards

  2. 40 CFR 141.622 - Subpart V monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... procedures; and (iv) Monitoring plans for any other systems in the combined distribution system if the State... current distribution system locations with expected high TTHM or HAA5 levels. The State may also require modifications in your monitoring plan. If you are a subpart H system serving > 3,300 people, you must submit a...

  3. Facility effluent monitoring plan for the 327 Facility

    International Nuclear Information System (INIS)

    1994-11-01

    The 327 Facility [Post-Irradiation Testing Laboratory] provides office and laboratory space for Pacific Northwest Laboratory (PNL) scientific and engineering staff conducting multidisciplinary research in the areas of post-irradiated fuels and structural materials. The facility is designed to accommodate the use of radioactive and hazardous materials in the conduct of these activities. This report summarizes the airborne emissions and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  4. Yakima fisheries project spring chinook supplementation monitoring plan

    International Nuclear Information System (INIS)

    Busack, C.; Pearsons, T.; Knudsen, C.; Phelps, S.; Watson, B.; Johnston, M.

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document

  5. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).

  6. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    International Nuclear Information System (INIS)

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site's contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. The 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b)

  7. 24 CFR 108.20 - Monitoring office responsibility for monitoring plans and reports.

    Science.gov (United States)

    2010-04-01

    ... documenting the implementation of the AFHM plan, including sales or rental reports, as required by the.... When sales or rental reports show that 20% of the units covered by the AFHM plan have been sold or... for monitoring plans and reports. 108.20 Section 108.20 Housing and Urban Development Regulations...

  8. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S. [and others

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions.

  9. Oak Ridge Y-12 Plant biological monitoring and abatement program (BMAP) plan

    International Nuclear Information System (INIS)

    Adams, S.M.; Brandt, C.C.; Cicerone, D.S.

    1998-02-01

    The proposed Biological Monitoring and Abatement Program (BMAP) for East Fork Poplar Creek (EFPC) at the Oak Ridge Y-12 Plant, as described, will be conducted for the duration of the National Pollutant Discharge Elimination System permit issued for the Y-12 Plant on April 28, 1995, and which became effective July 1, 1995. The basic approach to biological monitoring used in this program was developed by the staff in the Environmental Sciences Division at the Oak Ridge National Laboratory at the request of Y-12 Plant personnel. The proposed BMAP plan is based on results of biological monitoring conducted since 1985. Details of the specific procedures used in the current routine monitoring program are provided, but experimental designs for future studies are described in less detail. The overall strategy used in developing this plan was, and continues to be, to use the results obtained from each task to define the scope of future monitoring efforts. Such efforts may require more intensive sampling than initially proposed in some areas or a reduction in sampling intensity in others. By using the results of previous monitoring efforts to define the current program and to guide them in the development of future studies, an effective integrated monitoring program has been developed to assess the impacts of the Y-12 Plant operation on the biota of EFPC and to document the ecological effects of remedial actions

  10. Facility effluent monitoring plan for K Area Spent Fuel. Revision 1

    International Nuclear Information System (INIS)

    Hunacek, G.S.

    1995-09-01

    The scope of this document includes program plans for monitoring and characterizing radioactive and nonradioactive hazardous materials discharged in the K Area effluents. This FEMP includes complete documentation for both airborne and liquid effluent monitoring systems that monitor radioactive and nonradioactive hazardous pollutants that could be discharged to the environment under routine and/or upset conditions. This documentation is provided for each K Area facility that uses, generates, releases, or manages significant quantities of radioactive and nonradioactive hazardous materials that could impact public and employee safety and the environment. This FEW describes the airborne and liquid effluent paths and the associated sampling and monitoring systems of the K Area facilities. Sufficient information is provided on the effluent characteristics and the effluent monitoring systems so that a compliance assessment against requirements may be performed. Adequate details are supplied such that radioactive and hazardous material source terms may be related to specific effluent streams which are, in turn, related to discharge points and finally compared to the effluent monitoring system capability

  11. Geographic information system planning and monitoring best ...

    African Journals Online (AJOL)

    Poor urbanization policies, inefficient planning and monitoring technologies are evident. The consequences include some of the worst types of environmental hazards. Best urbanization practices require integrated planning approaches that result in environmental conservation. Geographic Information systems (GIS) provide ...

  12. Electromagnetic fields and health impact: measurements, monitoring and environmental indicators

    International Nuclear Information System (INIS)

    Lubritto, C.; Vetromile, C.; Petraglia, A.; Racioppoli, M.; D'Onofrio, A.

    2008-01-01

    Full text: During the last 10 years there has been a remarkable growth of the attention for problems related to the electromagnetic pollution, motivated by the alert connected to potential risk for the health of persons and due to the increasing diffusion of Bats for mobile telecommunication as EMF sources. Many projects are being realized about the environmental and health impact of electromagnetic field and an important social role is played by specific actions to minimize the risk perception of the population. This study aims to find an innovative approach to these problems through the use of a system of continuous time monitoring of the electromagnetic fields and the individuation of appropriate environmental indicators. The proposed system monitors the electromagnetic fields continuously over time, and is already operating in many southern Italian cities. It works in a very efficient way as a mean for: a) Info to the citizens, thanks to diffusion of daily collected data on Internet Web; b) Control for local administrations and Authorities, due to capability of the system itself to alert when measured values exceed the limits reported by the Italian laws; c) Planning, for the implementation of : 1) New procedures agreed among local environmental control agency, local administrations and mobile Companies for network planning and management of alarm situations; 2) New local guidelines documents concerning the installation and operation of telecommunications apparatus. Moreover, starting from the general principles of the Strategic Environmental Evaluation (VAS), the environmental impacts of EMS field is studied. Based on the model DPSIR (Drivers, Pressure, State, Impacts, Responses), 12 environmental indicators have been chosen providing an immediate and understandable tool to obtain very important information on electromagnetic pollution generated by radio-telecommunication systems. The selected environmental indicators have been applied to 11 cities of the

  13. UAV Based Agricultural Planning and Landslide Monitoring

    Directory of Open Access Journals (Sweden)

    Servet Yaprak

    2017-12-01

    Full Text Available The use of Unmanned Aerial Vehicle (UAV tools has become widespread in map production, land surveying, landslide, erosion monitoring, monitoring of agricultural activities, aerial crop surveying, forest fire detection and monitoring operations. In this study, GEO 2 UAV manufactured by TEKNOMER equipped with SONY A6000 camera has been used. The flight plan have been performed with 100 m altitude, with 80% longitudinal and 60% side overlapping. Ground Control Points (GCPs have been observed with Topcon and Trimble GNSS geodetic receivers. Recorded GNSS signals have been processed with LGO V.8.4 software to get sensitive location information. 985 photos have been taken for the 344 hectares the agricultural area. 291 photos have been taken for 50 hectares the landslide area. All photos were processed by PIX4D software. For the agricultural area, 25 GCPs and for the landslide area, 8 GCPs have been included in the evaluation. 3D images were produced with pixel matching algorithms. As a result, the RMS evaluation was obtained as ±0.054 m for the agricultural area and as ±0.018 m for the landslide area. UAV images have indisputable contributions to the management of catastrophes such as landslides and earthquakes, and it is impossible to make terrestrial measurements in areas where disaster impact continues.

  14. Facility effluent monitoring plan for the 324 Facility

    International Nuclear Information System (INIS)

    1994-11-01

    The 324 Facility [Waste Technology Engineering Laboratory] in the 300 Area primarily supports the research and development of radioactive and nonradioactive waste vitrification technologies, biological waste remediation technologies, spent nuclear fuel studies, waste mixing and transport studies, and tritium development programs. All of the above-mentioned programs deal with, and have the potential to, release hazardous and/or radioactive material. The potential for discharge would primarily result from (1) conducting research activities using the hazardous materials, (2) storing radionuclides and hazardous chemicals, and (3) waste accumulation and storage. This report summarizes the airborne and liquid effluents, and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterizing effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  15. Using Copernicus earth observation services to monitor climate change impacts and adaptations

    Science.gov (United States)

    Becker, Daniel; Zebisch, Marc; Sonnenschein, Ruth; Schönthaler, Konstanze; von Andrian-Werburg, Stefan

    2016-04-01

    In the last years, earth observation made a big leap towards an operational monitoring of the state of environment. Remote sensing provides for instance information on the dynamics, trends and anomalies of snow and glaciers, vegetation, soil moisture or water temperature. In particular, the European Copernicus initiative offers new opportunities through new satellites with a higher temporal and spatial resolution, operational services for environmental monitoring and an open data access policy. With the Copernicus climate change service and the ESA climate change initiative, specific earth observation programs are in place to address the impacts of climate change. However, such products and services are until now rarely picked up in the field of policy or decision making oriented climate impact or climate risk assessments. In this talk, we will present results of a study, which focus on the question, if and how remote sensing approaches could be integrated into operational monitoring activities of climate impacts and response measures on a national and subnational scale. We assessed all existing and planned Copernicus services regarding their relevance for climate impact monitoring by comparing them against the indication fields from an indicator system for climate impact and response monitoring in Germany, which has lately been developed in the framework of the German national adaptation strategy. For several climate impact or response indicators, an immediate integration of remote sensing data could be identified and been recommended. For these cases, we will show practical examples on the benefit of remote sensing data. For other indication fields, promising approaches were found, which need further development. We argue that remote sensing is a very valuable complement to the existing indicator schemes by contributing with spatial explicit, timely information but not always easy to integrate with classical approaches, which are oriented towards consistent long

  16. Monitoring Diffuse Impacts: Australian Tourism Developments.

    Science.gov (United States)

    Warnken; Buckley

    2000-04-01

    / The scientific quality of monitoring for diffuse environmental impacts has rarely been quantified. This paper presents an analysis of all formal environmental monitoring programs for Australian tourism developments over a 15-year period from 1980 to 1995. The tourism sector provides a good test bed for this study because tourism developments are (1) often adjacent to or even within conservation reserves and other relatively undisturbed natural environments, and (2) often clustered, with resulting cumulative impacts that require detection at an early stage. Here we analyze the precision and reliability with which monitoring programs as actually implemented can detect diffuse environmental impacts against natural variation. Of 175 Australian tourism developments subject to EIA from 1980 to 1993 inclusive, only 13 were subject to formal monitoring. Only 44 individual parameters, in total, were monitored for all these developments together. No baseline monitoring was conducted for nine of the 44 parameters. For the remaining 35, only one was monitored for a full year. Before, after, control, impact, paired sampling (BACIP) monitoring designs were used for 24 of the 44 parameters, and power analysis in 10. The scientific quality of monitoring was significantly better for developments subject to control by the Great Barrier Reef Marine Park Authority (GBRMPA). The key factor appears to be the way in which GBRMPA uses external referees and manages external consultants. The GBRMPA model merits wider adoption.

  17. Spring Chinook Supplementation Monitoring; Yakima Fisheries Project Management Plan, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Busack, Craig A. (Washington Department of Fish and Wildlife, Olympia, WA); Watson, Bruce; Johnston, Mark (Confederated Tribes and Bands of the Yakama Nation, Fisheries Resource Management, Toppenish, WA)

    1997-08-01

    The Yakima Fisheries Project (YFP), a key element in the Northwest Power Planning Council's Fish and Wildlife Program, has been in planning for more than ten years. It was initially conceived as, and is still intended to be, a multipurpose project. Besides increasing fish production in the Yakima basin, it is also intended to yield information about supplementation that will be of value to the entire Columbia basin, and hopefully the entire region. Because of this expectation of increased knowledge resulting from the project, a large and comprehensive monitoring program has always been seen as an integral part of the project. Despite the importance of monitoring to the project, monitoring planning has been slow to develop. The only general written statement of monitoring planning for the project is Chapter 9 of the current Project Status Report (PSR), written in 1993. That document is a reasonably good overview, and presents some important basic principles of monitoring, but is decidedly lacking in specifics. Throughout 1996 the Monitoring Implementation and Planning Team (MIPT), an interdisciplinary group of biologists who have worked on the project for several years, worked to develop a comprehensive spring chinook monitoring plan for the project. The result is the present document.

  18. Monitoring and Evaluation Plan for the Nez Perce Tribal Hatchery, 1996 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Steward, Cleveland R.

    1996-08-01

    The Nez Perce Tribe has proposed to build and operate the Nez Perce Tribal Hatchery (NPTH) in the Clearwater River subbasin of Idaho for the purpose of restoring self-sustaining populations of spring, summer, and fall chinook salmon to their native habitats. The project comprises a combination of incubation and rearing facilities, satellite rearing facilities, juvenile and adult collection sites, and associated production and harvest management activities. As currently conceived, the NPTH program will produce approximately 768,000 spring chinook parr, 800,000 summer chinook fry, and 2,000,000 fall chinook fry on an annual basis. Hatchery fish would be spawned, reared, and released under conditions that promote wild-type characteristics, minimize genetic changes in both hatchery and wild chinook populations, and minimize undesirable ecological interactions. The primary objective is to enable hatchery-produced fish to return to reproduce naturally in the streams in which they are released. These and other characteristics of the project are described in further detail in the Nez Perce Tribal Hatchery Master Plan (Larson and Mobrand 1992), the 1995 Supplement to the Master Plan (Johnson et al. 1995), and the Nez Perce Tribal Hatchery Program Environmental Impact Statement (Bonneville Power Administration et al. 1996). The report in hand is referred to in project literature as the NPTH Monitoring and Evaluation (M&E) Plan. This report describes monitoring and evaluation activities that will help NPTH managers determine. whether they were successful in restoring chinook salmon populations and avoiding adverse ecological impacts. Program success will be gauged primarily by changes in the abundance and distribution of supplemented chinook populations. The evaluation of project-related impacts will focus on the biological effects of constructing and operating NPTH hatchery facilities, introducing hatchery fish into the natural environment, and removing or displacing wild

  19. Savannah River Site Environmental Monitoring Plan. Volume 1, Section 1000 Addendum: Revision 3

    International Nuclear Information System (INIS)

    Jannik, G.T.

    1994-01-01

    This document -- the Savannah River Site Environmental Monitoring Plan (SRS EM Plan) -- has been prepared according to guidance contained in the DOE 5400 Series orders, in 10 CFR 834, and in DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and environmental Surveillance [DOE, 1991]. The SRS EM Plan's purpose is to define the criteria, regulations, and guideline requirements with which SRS will comply. These criteria and requirements are applicable to environmental monitoring activities performed in support of the SRS Environmental Monitoring Program (SRS EM Program), WSRC-3Q1-2, Volume 1, Section 1100. They are not applicable to monitoring activities utilized exclusively for process monitoring/control. The environmental monitoring program requirements documented in the SRS EM Plan incorporate all applicable should requirements of DOE/EH-0173T and expand upon them to include nonradiological environmental monitoring program requirements

  20. Groundwater monitoring plan for the 300 Area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Lindberg, J.W.; Chou, C.J.; Johnson, V.G.

    1995-05-23

    This document describes the groundwater monitoring program for the Hanford Site 300 Area Process Trenches (300 APT). The 300 APT are a Resource Conservation and Recovery Act of 1976 (RCRA) regulated unit. The 300 APT are included in the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit No. WA890008967, and are subject to final-status requirements for groundwater monitoring. This document describes a compliance monitoring program for groundwater in the uppermost aquifer system at the 300 APT. This plan describes the 300 APT monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the 300 APT. This plan will be used to meet groundwater monitoring requirements from the time the 300 APT becomes part of the Permit and through the postclosure care period until certification of final closure.

  1. Planning for exercises of the Federal Radiological Monitoring and Assessment Plan

    International Nuclear Information System (INIS)

    Adler, M.V.

    1985-11-01

    This report is to be used in planning radiological emergency exercises to test the Federal Radiological Monitoring and Assessment Plan (FRMAP). Although developed for this specific purpose, the document also contains material that may be useful for planning other types of exercises. This report describes the types of exercises that might be used, the steps in planning and conducting the exercises, and the special considerations required for exercises to test the FRMAP. FRMAP exercises typically involve several federal and state agencies. General and specific objectives that could guide these exercises, as well as the possible activities of all the participants - players, controllers, and evaluators - are discussed. The resources that each participating federal agency might provide during an exercise are listed

  2. Interim-status groundwater monitoring plan for the 216-B-63 trench

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-02-09

    This document outlines the groundwater monitoring plan, under RCRA regulations in 40 CFR 265 Subpart F and WAC173-300-400, for the 216-B-63 Trench. This interim status facility is being sampled under detection monitoring criteria and this plan provides current program conditions and requirements.

  3. 2002 Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    DOE Order 5400.1, General Environmental Protection Program, requires each DOE | facility to prepare an environmental management plan (EMP). This document is | prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment; applicable sections of Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) Part 834, ''Radiation Protection of the Public and Environment'' (draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1, which is the driver for the annual Site Environmental Report (SER) and the guidance source for preparing many environmental program documents. The WIPP Project is operated by Westinghouse TRU Solutions (WTS) for the DOE. This plan defines the extent and scope of WIPP's effluent and environmental | monitoring programs during the facility's operational life and also discusses WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP Project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance

  4. Liquid effluent retention facility final-status groundwater monitoring plan

    International Nuclear Information System (INIS)

    Sweeney, M.D.; Chou, C.J.; Bjornstad, B.N.

    1997-09-01

    The following sections describe the groundwater-monitoring program for the Liquid Effluent Retention Facility (LERF). The LERF is regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The LERF is included in the open-quotes Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, Permit WA890008967close quotes, (referred to herein as the Permit) (Ecology 1994) and is subject to final-status requirements for groundwater monitoring (WAC 173-303-645). This document describes a RCRA/WAC groundwater detection-monitoring program for groundwater in the uppermost aquifer system at the LERF. This plan describes the LERF monitoring network, constituent list, sampling schedule, statistical methods, and sampling and analysis protocols that will be employed for the LERF. This plan will be used to meet the groundwater monitoring requirements from the time the LERF becomes part of the Permit and through the post-closure care period, until certification of final closure

  5. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    Anderson, D.C.; Hall, D.B.

    1997-07-01

    This document constitutes a reclamation plan for the short-term and long-term stabilization of land disturbed by activities associated with the cleanup of radionuclide contaminated surface soil at the Clean Slate 1 site. This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. The results of reclamation trials at Area 11, Area 19 and more recently the reclamation demonstration plots at the Double Tracks cleanup site, have been summarized and incorporated into this reclamation and monitoring plan. The plan also contains procedures for monitoring both the effectiveness and success of short-term and long-term soil stabilization. The Clean Slate 1 site is located on the Tonopah Test Range. The surface soils were contaminated as a result of the detonation of a device containing plutonium and depleted uranium using chemical explosives. Short-term stabilization consists of the application of a chemical soil stabilizer that is applied immediately following excavation of the contaminated soils to minimize Pu resuspension. Long-term stabilization is accomplished by the establishment of a permanent vegetation

  6. Standard Guide for Environmental Monitoring Plans for Decommissioning of Nuclear Facilities

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2010-01-01

    1.1 This guide covers the development or assessment of environmental monitoring plans for decommissioning nuclear facilities. This guide addresses: (1) development of an environmental baseline prior to commencement of decommissioning activities; (2) determination of release paths from site activities and their associated exposure pathways in the environment; and (3) selection of appropriate sampling locations and media to ensure that all exposure pathways in the environment are monitored appropriately. This guide also addresses the interfaces between the environmental monitoring plan and other planning documents for site decommissioning, such as radiation protection, site characterization, and waste management plans, and federal, state, and local environmental protection laws and guidance. This guide is applicable up to the point of completing D&D activities and the reuse of the facility or area for other purposes.

  7. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-10

    This Environmental Monitoring Plan was prepared for the US Department of Energy`s (DOE`s) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan`s purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner.

  8. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface Water

    International Nuclear Information System (INIS)

    1997-10-01

    The Y-12 Plant conducts a surface water monitoring program in response to DOE Orders and state of Tennessee requirements under the National Pollutant Discharge Elimination System (NPDES). The anticipated codification of DOE Order 5400.5 for radiation protection of the public and the environment (10 CFR Part 834) will require an environmental radiation protection plan (ERPP). The NPDES permit issued by the state of Tennessee requires a radiological monitoring plan (RMP) for Y-12 Plant surface waters. In a May 4, 1995 memo, the state of Tennessee, Division of Water Pollution Control, stated their desired needs and goals regarding the content of RMPs, associated documentation, and data resulting from the RMPs required under the NPDES permitting system (L. Bunting, General Discussion, Radiological Monitoring Plans, Tennessee Division of Water Pollution Control, May 4,1995). Appendix A provides an overview of how the Y-12 Plant will begin to address these needs and goals. It provides a more complete, documented basis for the current Y-12 Plant surface water monitoring program and is intended to supplement documentation provided in the Annual Site Environmental Reports (ASERs), NPDES reports, Groundwater Quality Assessment Reports, and studies conducted under the Y-12 Plant Environmental Restoration (ER) Program. The purpose of this update to the Y-12 Plant RMP is to satisfy the requirements of the current NPDES permit, DOE Order 5400.5, and 10 CFR Part 834, as current proposed, by defining the radiological monitoring plan for surface water for the Y-12 Plant. This plan includes initial storm water monitoring and data analysis. Related activities such as sanitary sewer and sediment monitoring are also summarized. The plan discusses monitoring goals necessary to determine background concentrations of radionuclides, to quantify releases, determine trends, satisfy regulatory requirements, support consequence assessments, and meet requirements that releases be ''as low as

  9. Planning and monitoring the execution of web service requests

    NARCIS (Netherlands)

    Lazovik, Alexander; Aiello, Marco; Papazoglou, Mike

    2003-01-01

    Interaction with web services enabled marketplaces would be greatly facilitated if users were given a high level service request language to express their goals in complex business domains. This could be achieved by using a planning framework which monitors the execution of planned goals against

  10. Approaches to monitoring biological outcomes for HPV vaccination: challenges of early adopter countries

    DEFF Research Database (Denmark)

    Wong, Charlene A; Saraiya, Mona; Hariri, Susan

    2011-01-01

    In this review, we describe plans to monitor the impact of human papillomavirus (HPV) vaccine on biologic outcomes in selected international areas (Australia, Canada, Mexico, the Nordic countries, Scotland, and the United States) that have adopted this vaccine. This summary of monitoring plans...... provides a background for discussing the challenges of vaccine monitoring in settings where resources and capacity may vary. A variety of approaches that depend on existing infrastructure and resources are planned or underway for monitoring HPV vaccine impact. Monitoring HPV vaccine impact on biologic...

  11. Development of a PZT-based wireless digital monitor for composite impact monitoring

    International Nuclear Information System (INIS)

    Liu, Peipei; Yuan, Shenfang; Qiu, Lei

    2012-01-01

    One of the major concerns in the whole lifetime of composite materials in aircraft is their susceptibility to impact damage. And there has existed a need in recent years to develop an online structural health monitoring (SHM) system for impact monitoring. This paper proposes a new PZT-based wireless digital impact monitoring system development method aimed at giving a localized area for further inspection. Based on this method, a PZT-based wireless digital impact monitor (WDIM) with advantages of compactness, light weight, low power consumption and high efficiency is developed. Differently from conventional SHM systems, the complex analog circuits are removed and the whole process is achieved in a digital way by turning the output of the PZT sensor directly into a digital queue through a comparator. A simple but efficient sub-region location method is implemented in a field programmable gate array (FPGA) as the processing core of the WDIM to detect and record the impact events. In addition, wireless communication technology is used in the WDIM to transmit data and form a monitoring network. To illustrate the capability of the WDIM, a complete process dealing with an impact event is investigated and the stability of the WDIM is also evaluated in this paper. The WDIM shows its potential for real online applications in aircraft. (paper)

  12. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  13. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  14. Groundwater monitoring plan: 200 Areas treated effluent disposal facility (Project W-049H)

    International Nuclear Information System (INIS)

    Barnett, D.B.; Davis, J.D.; Collard, L.B.; Freeman, P.B.; Chou, C.J.

    1995-04-01

    This groundwater monitoring plan provides information that supports the US Department of Energy's application (DOE-RL 1994) for waste water discharge permit No. WA-ST-4502 from the State of Washington, under the auspices of Washington Administrative Code 173-216. The monitoring plan has two functions: (1) to summarize the results of a 3-yr characterization of the current hydrogeology and groundwater quality of the discharge site and (2) to provide plans for evaluating the effects of the facility's operation on groundwater quality and document compliance with applicable groundwater quality standards. Three wells were drilled to define the stratigraphy, evaluate sediment characteristics, and establish a groundwater monitoring net work for the discharge facility. These wells monitor groundwater quality upgradient and downgradient in the uppermost aquifer. This report proposes plans for continuing the monitoring of groundwater quality and aquifer characteristics after waste water discharges begin

  15. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    Energy Technology Data Exchange (ETDEWEB)

    Naidu, J.R.; Paquette, D.; Lee, R. [and others

    1996-10-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities.

  16. Brookhaven National Laboratory environmental monitoring plan for Calendar Year 1996

    International Nuclear Information System (INIS)

    Naidu, J.R.; Paquette, D.; Lee, R.

    1996-01-01

    As required by DOE Order 5400.1, each U.S. Department of Energy (DOE) site, facility, or activity that uses, generates, releases, or manages significant quantities of hazardous materials shall provide a written Environmental Monitoring Plan (EMP) covering effluent monitoring and environmental surveillance. DOE/EH-0173T, Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance, provides specific guidance regarding environmental monitoring activities

  17. Monitoring well plugging and abandonment plan, Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1997-05-01

    Plugging and abandonment (P ampersand A) of defunct groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP) (AJA Technical Services, Inc. 1996). This document is the revised groundwater monitoring well P ampersand A plan for the U.S. Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan describes the systematic approach employed by Y-12 Plant GWPP to identify wells that require P ampersand A, the technical methods employed to perform P ampersand A activities, and administrative requirements. Original documentation for Y-12 Plant GWPP groundwater monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A was provided in HSW, Inc. (1991). The original revision of the plan specified that a comprehensive monitoring well P ampersand A schedule be maintained. Wells are added to this list by issuance of both a P ampersand A request and a P ampersand A addendum to the schedule. The current Updated Subsurface Data Base includes a single mechanism to track the status of monitoring wells. In addition, rapid growth of the groundwater monitoring network and new regulatory requirements have resulted in constant changes to the status of wells. As a result, a streamlined mechanism to identify and track monitoring wells scheduled for P ampersand A has been developed and the plan revised to formalize the new business practices

  18. Environmental Monitoring Plan United States Department of Energy Richland Operations Office. Revision 2

    International Nuclear Information System (INIS)

    1997-01-01

    This Environmental Monitoring Plan was prepared for the US Department of Energy's (DOE's) Richland Operations Office (RL) to implement the requirements of DOE Order 5400.1. According to the Order, each DOE site, facility, or activity that uses, generates, releases, or manages significant pollutants or hazardous materials shall prepare a written environmental monitoring plan covering two major activities: (1) effluent monitoring and (2) environmental surveillance. The plan is to contain information discussing the rationale and design criteria for the monitoring programs, sampling locations and schedules, quality assurance requirements, program implementation procedures, analytical procedures, and reporting requirements. The plan's purpose is to assist DOE in the management of environmental activities at the Hanford Site and to help ensure that operations on the site are conducted in an environmentally safe and sound manner

  19. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Environmental Monitoring Plan applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this Environmental Monitoring Plan brings together in one document a description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA). The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  20. Monitoring well inspection and maintenance plan Y-12 Plant, Oak Ridge, Tennessee (revised)

    International Nuclear Information System (INIS)

    1996-09-01

    Inspection and maintenance of groundwater monitoring wells is a primary element of the Oak Ridge Y-12 Plant Groundwater Protection Program (GWPP). This document is the revised groundwater monitoring well inspection and maintenance plan for the U.S. Department of Energy (DOE) Y-12 Plant in Oak Ridge, Tennessee. The plan provides a systematic program for: (1) inspecting the physical condition of monitoring wells at the Y-12 Plant and (2) identifying maintenance needs that will extend the life of each well and ensure that representative groundwater quality samples and hydrologic data are collected from the wells. Original documentation for the Y-12 Plant GWPP monitoring well inspection and maintenance program was provided in HSW, Inc. 1991a. The original revision of the plan specified that only a Monitoring Well Inspection/Maintenance Summary need be updated and reissued each year. Rapid growth of the monitoring well network and changing regulatory requirements have resulted in constant changes to the status of wells (active or inactive) listed on the Monitoring Well Inspection/Maintenance Summary. As a result, a new mechanism to track the status of monitoring wells has been developed and the plan revised to formalize the new business practices. These changes are detailed in Sections 2.4 and 2.5

  1. Meteorological monitoring sampling and analysis plan for the environmental monitoring plan at Waste Area Grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses meteorological monitoring activities that wall be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Lockheed Martin Energy Systems, Inc. Meteorological monitoring of various climatological parameters (e.g., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model

  2. On the role of model-based monitoring for adaptive planning under uncertainty

    Science.gov (United States)

    Raso, Luciano; Kwakkel, Jan; Timmermans, Jos; Haasnoot, Mariolijn

    2016-04-01

    Adaptive plans, designed to anticipate and respond to an unfolding uncertain future, have found a fertile application domain in the planning of deltas that are exposed to rapid socioeconomic development and climate change. Adaptive planning, under the moniker of adaptive delta management, is used in the Dutch Delta Program for developing a nation-wide plan to prepare for uncertain climate change and socio-economic developments. Scientifically, adaptive delta management relies heavily on Dynamic Adaptive Policy Pathways. Currently, in the Netherlands the focus is shifting towards implementing the adaptive delta plan. This shift is especially relevant because the efficacy of adaptive plans hinges on monitoring on-going developments and ensuring that actions are indeed taken if and when necessary. In the design of an effective monitoring system for an adaptive plan, three challenges have to be confronted: • Shadow of the past: The development of adaptive plans and the design of their monitoring system relies heavily on current knowledge of the system, and current beliefs about plausible future developments. A static monitoring system is therefore exposed to the exact same uncertainties one tries to address through adaptive planning. • Inhibition of learning: Recent applications of adaptive planning tend to overlook the importance of learning and new information, and fail to account for this explicitly in the design of adaptive plans. • Challenge of surprise: Adaptive policies are designed in light of the current foreseen uncertainties. However, developments that are not considered during the design phase as being plausible could still substantially affect the performance of adaptive policies. The shadow of the past, the inhibition of learning, and the challenge of surprise taken together suggest that there is a need for redesigning the concepts of monitoring and evaluation to support the implementation of adaptive plans. Innovations from control theory

  3. Nuclear Explosion Monitoring Research and Engineering Program - Strategic Plan

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Leslie A. [DOE/NNSA

    2004-09-01

    The Department of Energy (DOE)/National Nuclear Security Administration (NNSA) Nuclear Explosion Monitoring Research and Engineering (NEM R&E) Program is dedicated to providing knowledge, technical expertise, and products to US agencies responsible for monitoring nuclear explosions in all environments and is successful in turning scientific breakthroughs into tools for use by operational monitoring agencies. To effectively address the rapidly evolving state of affairs, the NNSA NEM R&E program is structured around three program elements described within this strategic plan: Integration of New Monitoring Assets, Advanced Event Characterization, and Next-Generation Monitoring Systems. How the Program fits into the National effort and historical accomplishments are also addressed.

  4. Ocean climate indicators: A monitoring inventory and plan for tracking climate change in the north-central California coast and ocean region

    Science.gov (United States)

    Duncan, Benet; Higgason, Kelley; Suchanek, Tom; Largier, John; Stachowicz, Jay; Allen, Sarah; Bograd, Steven; Breen, R.; Gellerman, Holly; Hill, Tessa; Jahncke, Jaime; Johnson, Rebecca L.; Lonhart, Steve I.; Morgan, Steven; Wilkerson, Frances; Roletto, Jan

    2013-01-01

    The impacts of climate change, defined as increasing atmospheric and oceanic carbon dioxide and associated increases in average global temperature and oceanic acidity, have been observed both globally and on regional scales, such as in the North-central California coast and ocean, a region that extends from Point Arena to Point Año Nuevo and includes the Pacific coastline of the San Francisco Bay Area. Because of the high economic and ecological value of the region’s marine environment, the Gulf of the Farallones National Marine Sanctuary (GFNMS) and other agencies and organizations have recognized the need to evaluate and plan for climate change impacts. Climate change indicators can be developed on global, regional, and site-specific spatial scales, and they provide information about the presence and potential impacts of climate change. While indicators exist for the nation and for the state of California as a whole, no system of ocean climate indicators exist that specifically consider the unique characteristics of the California coast and ocean region. To that end, GFNMS collaborated with over 50 regional, federal, and state natural resource managers, research scientists, and other partners to develop a set of 2 ocean climate indicators specific to this region. A smaller working group of 13 regional partners developed monitoring goals, objectives, strategies, and activities for the indicators and recommended selected species for biological indicators, resulting in the Ocean Climate Indicators Monitoring Inventory and Plan. The working group considered current knowledge of ongoing monitoring, feasibility of monitoring, costs, and logistics in selecting monitoring activities and selected species.

  5. Radiological monitoring plan for the Oak Ridge Y-12 Plant: Surface water

    International Nuclear Information System (INIS)

    1995-01-01

    National Pollutant Discharge Elimination System (NPDES) Permit TN0002968, issued April 28, 1995, requires that the Y-12 Plant Radiological Monitoring Plan for surface water be modified (Part 111-H). These modifications shall consist of expanding the plan to include storm water monitoring and an assessment of alpha, beta, and gamma emitters. In addition, a meeting was held with personnel from the Tennessee Department of Environment and Conservation (TDEC) on May 4, 1995. In this meeting, TDEC personnel provided guidance to Y-12 Plant personnel in regard to the contents of the modified plan. This report contains a revised plan incorporating the permit requirements and guidance provided by TDEC personnel. In addition, modifications were made to address future requirements of the new regulation for radiation protection of the public and the environment in regards to surface water monitoring

  6. The generalized model of organization and planning of regional gas supply monitoring

    Directory of Open Access Journals (Sweden)

    Maria V. Shevchenko

    2015-12-01

    Full Text Available At the moment, gas is one of the most promising types of fuel in Ukraine. In this regard, the problems associated with its transportation in the regional system of gas supply are relevant. Now it is not completely solved and needs detailed study the problem of monitoring the regional gas supply system. Aim: The aim of the study is to improve the efficiency of the regional gas supply system at the expense of the organization and planning of gas transport monitoring and, in the future, the synthesis of the monitoring system of regional gas supply. Materials and Methods: The generalized model of organization and planning of monitoring regional gas suppliers were developed to achieve this goal. It allows making decisions on the organization of the monitoring system. In addition, this model makes it possible to plan under conditions of multicriteriality and uncertainty of the source data. Results: The basic criteria and constraints for solving the problem of organizing and planning the monitoring system of regional gas supply are proposed in this work. The corresponding computations were made to confirm the assumptions. The calculations were carried out in context of uncertainty of input data using a set of methods for the analysis of hierarchies, exhaustive search, as well as the methods of decision making in context of uncertainty.

  7. Environmental Monitoring Plan, Nevada Test Site and support facilities

    International Nuclear Information System (INIS)

    1991-11-01

    This Operational Area Monitoring Plan for environmental monitoring, is for EG ampersand G Energy Measurements, Inc. (EG ampersand G/EM) which operates several offsite facilities in support of activities at the Nevada Test Site (NTS). These facilities include: (1) Amador Valley Operations (AVO), Pleasanton, California; (2) Kirtland Operations (KO), Kirtland Air Force base, Albuquerque, New Mexico (KAFB); (3) Las Vegas Area Operations (LVAO), Remote Sensing Laboratory (RSL), and North Las Vegas (NLV) Complex at Nellis Air Force Base (NAFB), North Las Vegas, Nevada; (4) Los Alamos Operations (LAO), Los Alamos, New Mexico; (5) Santa Barbara Operations (SBO), Goleta, California; (6) Special Technologies Laboratory (STL), Santa Barbara, California; (7) Washington Aerial Measurements Department (WAMD), Andrews Air Force Base, Maryland; and, (8) Woburn Cathode Ray Tube Operations (WCO), Woburn, Massachusetts. Each of these facilities has an individual Operational Area Monitoring Plan, but they have been consolidated herein to reduce redundancy

  8. Test plan for air monitoring during the Cryogenic Retrieval Demonstration

    International Nuclear Information System (INIS)

    Yokuda, E.

    1992-06-01

    This report presents a test plan for air monitoring during the Cryogenic Retrieval Demonstration (CRD). Air monitors will be used to sample for the tracer elements neodymium, terbium, and ytterbium, and dysprosium. The results from this air monitoring will be used to determine if the CRD is successful in controlling dust and minimizing contamination. Procedures and equipment specifications for the test are included

  9. Work plan for the Oak Ridge Reservation ecological monitoring and assessment program

    International Nuclear Information System (INIS)

    Ashwood, T.L.; Sample, B.E.; Suter, G.W. II; Turner, M.G.; Loar, J.M.; Barnthouse, L.W.

    1994-08-01

    This plan describes an approach for developing an ecological monitoring and assessment program (EMAP) for the US Department of Energy's (DOE's) Oak Ridge Reservation (ORR). Such a program is required to assess existing ecological risks, to predict changes in those ecological risks from proposed remedial actions, and to monitor the effectiveness of remedial actions in reducing ecological risks. Ecological risk assessments must be based on Reservation-level data for those widespread or wide-ranging plant and animal species that occupy the entire ORR. In recognition of this need, Region 4 of the US Environmental Protection Agency has specifically requested that DOE develop a Reservation-wide monitoring and assessment program. The current strategy distinguishes four types of potentially contaminated areas: (1) source operable units (OUs), which may contain waste disposal areas, (2) groundwater aquifers that are potentially contaminated by source OUs, (3) aquatic integrator OUs which are streams and associated floodplains that drain source OUs, and (4) the terrestrial integrator, which encompasses the Reservation. Source OUs may contain sources of contamination that potentially impact local plant and animal population and communities that are restricted to the areal extent of the OU. Such local impacts must be assessed for each OU. However, these source OUs also contribute to risks within the aquatic OUs and within the Reservation-wide terrestrial ecosystem. Therefore, remedial investigations at source OUs must provide data necessary to support ecological risk assessments at the larger scales

  10. Biodiversity in School Grounds: Auditing, Monitoring and Managing an Action Plan

    Science.gov (United States)

    Mansell, Michelle

    2010-01-01

    The idea of using site biodiversity action plans to introduce biodiversity management initiatives into school grounds is outlined. Selected parts of a case study, involving the use of such an action plan to record, monitor and plan for biodiversity on a university campus, are described and ideas for applying a similar plan to a school setting are…

  11. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    International Nuclear Information System (INIS)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q.

    2015-01-01

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  12. Quality assurance for online adapted treatment plans: Benchmarking and delivery monitoring simulation

    Energy Technology Data Exchange (ETDEWEB)

    Li, Taoran, E-mail: taoran.li.duke@gmail.com; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q. [Department of Radiation Oncology, Duke University Medical Center Durham, North Carolina 27710 (United States)

    2015-01-15

    Purpose: An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. Methods: The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system’s performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery

  13. Quality assurance for online adapted treatment plans: benchmarking and delivery monitoring simulation.

    Science.gov (United States)

    Li, Taoran; Wu, Qiuwen; Yang, Yun; Rodrigues, Anna; Yin, Fang-Fang; Jackie Wu, Q

    2015-01-01

    An important challenge facing online adaptive radiation therapy is the development of feasible and efficient quality assurance (QA). This project aimed to validate the deliverability of online adapted plans and develop a proof-of-concept online delivery monitoring system for online adaptive radiation therapy QA. The first part of this project benchmarked automatically online adapted prostate treatment plans using traditional portal dosimetry IMRT QA. The portal dosimetry QA results of online adapted plans were compared to original (unadapted) plans as well as randomly selected prostate IMRT plans from our clinic. In the second part, an online delivery monitoring system was designed and validated via a simulated treatment with intentional multileaf collimator (MLC) errors. This system was based on inputs from the dynamic machine information (DMI), which continuously reports actual MLC positions and machine monitor units (MUs) at intervals of 50 ms or less during delivery. Based on the DMI, the system performed two levels of monitoring/verification during the delivery: (1) dynamic monitoring of cumulative fluence errors resulting from leaf position deviations and visualization using fluence error maps (FEMs); and (2) verification of MLC positions against the treatment plan for potential errors in MLC motion and data transfer at each control point. Validation of the online delivery monitoring system was performed by introducing intentional systematic MLC errors (ranging from 0.5 to 2 mm) to the DMI files for both leaf banks. These DMI files were analyzed by the proposed system to evaluate the system's performance in quantifying errors and revealing the source of errors, as well as to understand patterns in the FEMs. In addition, FEMs from 210 actual prostate IMRT beams were analyzed using the proposed system to further validate its ability to catch and identify errors, as well as establish error magnitude baselines for prostate IMRT delivery. Online adapted plans were

  14. Evaluation of the EIA system on the Island of Mauritius and development of an environmental monitoring plan framework

    International Nuclear Information System (INIS)

    Ramjeawon, T.; Beedassy, R.

    2004-01-01

    The Environment Protection Act (EPA) in Mauritius provides for the application of an EIA license in respect of undertakings listed in its first schedule. Following the promulgation of the Act in June 1993, the Department of Environment (DOE) is issuing an average of 125 EIA licenses yearly. In general, the review exercise of an environmental impact assessment (EIA) is terminated once the license has been granted. The aim of this project was to evaluate the EIA system in Mauritius and to identify its weaknesses and strengths. One of the main weaknesses, besides the lack of EIA audits, is the absence of EIA follow-up monitoring. It is necessary to distinguish between monitoring done for regulatory purposes (compliance monitoring) and environmental monitoring related to the EIA. With the growth of the tourism industry on the island, coastal development projects have the potential to cause significant environmental impacts . A sample of EIA reports pertaining to this sector was assessed for its quality and follow-up mechanisms. Proposals for the contents of EIA Prediction Audits, Environmental Monitoring Plans (EMP) and the format for an EMP report are made

  15. Facility effluent monitoring plan for the 325 Facility

    International Nuclear Information System (INIS)

    1998-01-01

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  16. Facility Effluent Monitoring Plan for the 3720 Building

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the Environmental Science Laboratory (3720 Facility) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs'' This FEMP has been prepared for the 3720 Facility primarily because it has a major (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The 3720 Facility provides office and laboratory space for PNNL scientific and engineering staff conducting multidisciplinary research in the areas of materials characterization and testing and waste management. The facility is designed to accommodate the use of radioactive and hazardous materials to conduct these activities. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, and dispersible particulate. The facility is in the process of being vacated for shutdown, but is considered a Major Emission Point as of the date of this document approval.

  17. Columbia River impact evaluation plan

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    As a result of past practices, four areas of the Hanford Site (the 100, 200, 300, and 1100 Areas) have been included on the US Environmental Protection Agency`s (EPA`s) National Priorities List (NPL) under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. To accomplish the timely cleanup of the past-practice units, the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement), was signed by the Washington State Department of Ecology (Ecology), EPA, and the US Department of Energy (DOE). To support the Tri-Party Agreement, milestones were adopted. These milestones represent the actions needed to ensure acceptable progress toward Hanford Site compliance with CERCLA, RCRA, and the Washington State Hazardous Waste Management Act of 1976. This report was prepared to fulfill the requirement of Tri-Party Agreement Milestone M-30-02, which requires a plan to determine cumulative health and environmental impacts to the Columbia River. This plan supplements the CERCLA remedial investigations/feasibility studies (RI/FS) and RCRA facility investigations/corrective measures studies (RFI/CMSs) that will be undertaken in the 100 Area. To support the plan development process, existing information was reviewed and a preliminary impact evaluation based on this information was performed. The purpose of the preliminary impact evaluation was to assess the adequacy of existing data and proposed data collection activities. Based on the results of the evaluation, a plan is proposed to collect additional data or make changes to existing or proposed data collection activities.

  18. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Science.gov (United States)

    2013-06-24

    ...The Bureau of Reclamation and the California Department of Parks and Recreation (CDPR) have prepared a Final Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the San Luis Reservoir State Recreation Area Resource Management Plan/General Plan (RMP/GP). The Final EIS/EIR describes and presents the environmental effects of the No Action/No Project Alternative and three Action Alternatives for implementing the RMP/GP. A Notice of Availability of the Draft EIS/EIR was published in the Federal Register on August 3, 2012 (77 FR 46518). The comment period on the Draft EIS/EIR ended on October 2, 2012. The Final EIS/EIR contains responses to all comments received and reflects comments and any additional information received during the review period.

  19. NASA Lunar Impact Monitoring

    Science.gov (United States)

    Suggs, Robert M.; Moser, D. E.

    2015-01-01

    The MSFC lunar impact monitoring program began in 2006 in support of environment definition for the Constellation (return to Moon) program. Work continued by the Meteoroid Environment Office after Constellation cancellation. Over 330 impacts have been recorded. A paper published in Icarus reported on the first 5 years of observations and 126 calibrated flashes. Icarus: http://www.sciencedirect.com/science/article/pii/S0019103514002243; ArXiv: http://arxiv.org/abs/1404.6458 A NASA Technical Memorandum on flash locations is in press

  20. Low Impact Development Master Plan

    Energy Technology Data Exchange (ETDEWEB)

    Loftin, Samuel R. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-10-02

    This project creates a Low Impact Development (LID) Master Plan to guide and prioritize future development of LID projects at Los Alamos National Laboratory (LANL or the Laboratory). The LID Master Plan applies to developed areas across the Laboratory and focuses on identifying opportunities for storm water quality and hydrological improvements in the heavily urbanized areas of Technical Areas 03, 35 and 53. The LID Master Plan is organized to allow the addition of LID projects for other technical areas as time and funds allow in the future.

  1. Monitoring the impact of HPV vaccine in males—Considerations and challenges

    Directory of Open Access Journals (Sweden)

    Julia M.L. Brotherton

    2016-12-01

    Full Text Available In this article, we examine the issues involved if national or sub-national programs are considering extending post HPV vaccine introduction monitoring to include males. Vaccination programs are now being extended to include males in some countries, in order to improve population level HPV infection control and to directly prevent HPV-related disease in males such as anogenital warts and anal cancers. Coverage and adverse events surveillance are essential components of post-vaccination monitoring. Monitoring the impact of vaccination on HPV infection and disease in men raises some similar challenges to monitoring in females, such as the long time frame until cancer outcomes, and also different ones given that genital specimens suitable for monitoring HPV prevalence are not routinely collected for other diagnostic or screening purposes in males. Thus, dedicated surveillance strategies must be designed; the framework of these may be country-specific, dependent upon the male population that is offered vaccination, the health care infrastructure and existing models of disease surveillance such as STI networks. The primary objective of any male HPV surveillance program will be to document changes in the prevalence of HPV infection and disease due to vaccine targeted HPV types occurring post vaccination. The full spectrum of outcomes to be considered for inclusion in any surveillance plan includes HPV prevalence monitoring, anogenital warts, potentially pre-cancerous lesions such as anal squamous intraepithelial lesions (SIL, and cancers. Ideally, a combination of short term and long term outcome measures would be included. Surveillance over time in specific targeted populations of men who have sex with men and HIV-infected men (populations at high risk for HPV infection and associated disease could be an efficient use of resources to demonstrate impact. Keywords: Human papillomavirus, Males, Disease surveillance, Vaccine effectiveness

  2. Groundwater Monitoring Plan for the 1301-N, 1324-N/NA, and 1325-N RCRA Facilities

    International Nuclear Information System (INIS)

    Hartman, Mary J.

    2001-01-01

    The 1301-N and 1325-N Liquid Waste Disposal Facilities, the 1324-N Surface Impoundment, and the 1324-NA Percolation Pond, located in the 100 N Area of the Hanford Site, are regulated under the Resource Conservation and Recovery Act of 1976 (RCRA). The closure plans for these facilities stipulate that groundwater is monitored according to the 100-N Pilot Project: Proposed Consolidated Groundwater Monitoring Program (BHI-00725). This document supplements the consolidated plan by providing information on sampling and analysis protocols, quality assurance, data management, and a conceptual model for the RCRA sites. Monitoring well networks, constituents, and sampling frequency remain the same as in the consolidated plan or the previous groundwater monitoring plan (Hartman 1996)

  3. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    International Nuclear Information System (INIS)

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. The Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment

  4. Environmental impact assessment based on planning support system

    NARCIS (Netherlands)

    Carsjens, G.J.; Chen, W.

    2011-01-01

    How to assess environmental impact is one of the keys in land use planning. This article described in detail the concepts of activities, impact zones, functions, and sensitivities, as well as the development of STEPP (strategic tool for integrating environmental aspects in planning procedures) based

  5. Path Planning & Measurement Registration for Robotic Structural Asset Monitoring

    OpenAIRE

    Pierce , Stephen Gareth; Macleod , Charles Norman; Dobie , Gordon; Summan , Rahul

    2014-01-01

    International audience; The move to increased levels of autonomy for robotic delivery of inspection for asset monitoring, demands a structured approach to path planning and measurement data presentation that greatly surpasses the more ad‐,hoc approach typically employed by remotely controlled, but manually driven robotic inspection vehicles. The authors describe a traditional CAD/CAM approach to motion planning (as used in machine tool operation) which has numerous benefits including the...

  6. 77 FR 22761 - Draft Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2012-04-17

    ... War ironclad, USS Monitor, best known for its battle with the Confederate ironclad, CSS Virginia in... plan is comprised of eight action plans (education and outreach; research and monitoring; resource...

  7. Radiation monitoring systems and methodologies for radiological impact assessment

    International Nuclear Information System (INIS)

    Chaudhury, Probal

    2016-01-01

    Radioactive sources of various strengths are used in large number of applications in industry, healthcare, agriculture and research. Though all the sources are transported and used under regulatory control, there is always a possibility of some of the sources getting into the hands of committed antisocial non state actors. In addition to this, there is a possible threat of radioactive material being illegally brought into a country. These gives rise to an increase in the global radiological threat and security experts world over are concerned about the possibility of malicious use of radiation in the public domain. Radiation detection systems are installed at various entry and exit ports of some of the countries to detect illicit trafficking of radioactive materials. IAEA has recommended that all States should have a national response plan for nuclear security events to provide for an appropriate and coordinated response. Considering the requirement of radiological emergency preparedness, various radiation monitoring systems and methodologies have been developed. A few aerial radiation monitoring systems developed at Bhabha Atomic Research Centre (BARC) for radiological impact assessment are described here

  8. Monitoring plan and maintenance NPP the Vandellos I and future prospects

    International Nuclear Information System (INIS)

    Margalef Escoda, S.

    2013-01-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  9. Acceptance Test Plan for Fourth-Generation Corrosion Monitoring Cabinet

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Acceptance Test Plan (ATP) will document the satisfactory operation of the third-generation corrosion monitoring cabinet (Hiline Engineering Part No.0004-CHM-072-C01). This ATP will be performed by the manufacturer of the cabinet prior to delivery to the site. The objective of this procedure is to demonstrate and document the acceptance of the corrosion monitoring cabinet. The test will consist of a continuity test of the cabinet wiring from the end of cable to be connected to corrosion probe, through the appropriate intrinsic safety barriers and out to the 15 pin D-shell connectors to be connected to the corrosion monitoring instrument. Additional testing will be performed using a constant current and voltage source provided by the corrosion monitoring hardware manufacturer to verify proper operation of corrosion monitoring instrumentation

  10. Columbia River Channel Improvement Project Rock Removal Blasting: Monitoring Plan

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.

    2010-01-29

    This document provides a monitoring plan to evaluate take as outlined in the National Marine Fisheries Service 2002 Biological Opinion for underwater blasting to remove rock from the navigation channel for the Columbia River Channel Improvement Project. The plan was prepared by the Pacific Northwest National Laboratory (PNNL) for the U.S. Army Corps of Engineers (USACE), Portland District.

  11. Clean Slate 1 revegetation and monitoring plan

    International Nuclear Information System (INIS)

    1996-09-01

    This document is a reclamation plan for short-term and long-term stabilization of land disturbed by activities associated with interim cleanup of radionuclide-contaminated surface soil at the Clean Slate 1 site (located on the Tonopah Test Range). This document has been prepared to provide general reclamation practices and procedures that will be followed during restoration of the cleanup site. Reclamation demonstration plots were established near the Double Tracks cleanup site in the fall of 1994 to evaluate the performance of several native plant species and to evaluate different irrigation strategies. Results of that study, and the results from numerous other studies conducted at other sites (Area 11 and Area 19 of the Nevada Test Site), have been summarized and incorporated into this final reclamation plan for the cleanup of the Clean Slate 1 site. The plan also contains procedures for monitoring both short-term and long-term reclamation

  12. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field.

  13. Groundwater level monitoring sampling and analysis plan for the environmental monitoring plan at waste area grouping 6, Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document is the Groundwater Level Monitoring Sampling and Analysis Plan (SAP) for Waste Area Grouping (WAG) 6 at Oak Ridge National Laboratory (ORNL). Note that this document is referred to as a SAP even though no sampling and analysis will be conducted. The term SAP is used for consistency. The procedures described herein are part of the Environmental Monitoring Plan (EMP) for WAG 6, which also includes monitoring tasks for seeps and springs, groundwater quality, surface water, and meteorological parameters. Separate SAPs are being issued concurrently to describe each of these monitoring programs. This SAP has been written for the use of the field personnel responsible for implementation of the EMP, with the intent that the field personnel will be able to take these documents to the field and quickly find the appropriate steps required to complete a specific task. In many cases, Field Operations Procedures (FOPs) will define the steps required for an activity. The FOPs for the EMP are referenced and briefly described in the relevant sections of the SAPs, and are contained within the FOP Manual. Both these documents (the SAP and the FOP Manual) will be available to personnel in the field

  14. Waste Isolation Pilot Plant Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    Westinghouse Electric Company Waste Isolation Division

    1999-01-01

    DOE Order 5400.1, General Environmental Protection Program Requirements (DOE, 1990a), requires each DOE facility to prepare an EMP. This document is prepared for WIPP in accordance with the guidance contained in DOE Order 5400.1; DOE Order 5400.5, Radiation Protection of the Public and Environment (DOE, 1990b); Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE/EH-0173T; DOE, 1991); and the Title 10 Code of Federal Regulations (CFR) 834, Radiation Protection of the Public and Environment (Draft). Many sections of DOE Order 5400.1 have been replaced by DOE Order 231.1 (DOE, 1995), which is the driver for the Annual Site Environmental Report (ASER) and the guidance source for preparing many environmental program documents. The WIPP project is operated by Westinghouse Electric Company, Waste Isolation Division (WID), for the DOE. This plan defines the extent and scope of the WIPP's effluent and environmental monitoring programs during the facility's operational life and also discusses the WIPP's quality assurance/quality control (QA/QC) program as it relates to environmental monitoring. In addition, this plan provides a comprehensive description of environmental activities at WIPP including: A summary of environmental programs, including the status of environmental monitoring activities A description of the WIPP project and its mission A description of the local environment, including demographics An overview of the methodology used to assess radiological consequences to the public, including brief discussions of potential exposure pathways, routine and accidental releases, and their consequences Responses to the requirements described in the Environmental Regulatory Guide for Radiological Effluent Monitoring and Environmental Surveillance (DOE, 1991). This document references DOE orders and other federal and state regulations affecting environmental monitoring programs at the site. WIPP procedures, which implement

  15. Hurricane Sandy science plan: coastal impact assessments

    Science.gov (United States)

    Stronko, Jakob M.

    2013-01-01

    Hurricane Sandy devastated some of the most heavily populated eastern coastal areas of the Nation. With a storm surge peaking at more than 19 feet, the powerful landscape-altering destruction of Hurricane Sandy is a stark reminder of why the Nation must become more resilient to coastal hazards. In response to this natural disaster, the U.S. Geological Survey (USGS) received a total of $41.2 million in supplemental appropriations from the Department of the Interior (DOI) to support response, recovery, and rebuilding efforts. These funds support a science plan that will provide critical scientific information necessary to inform management decisions for recovery of coastal communities, and aid in preparation for future natural hazards. This science plan is designed to coordinate continuing USGS activities with stakeholders and other agencies to improve data collection and analysis that will guide recovery and restoration efforts. The science plan is split into five distinct themes: coastal topography and bathymetry, impacts to coastal beaches and barriers, impacts of storm surge, including disturbed estuarine and bay hydrology, impacts on environmental quality and persisting contaminant exposures, impacts to coastal ecosystems, habitats, and fish and wildlife. This fact sheet focuses assessing impacts to coastal beaches and barriers.

  16. Planning Environmental Impact Assessment Orienting Sustainable Development:Opportunities and Challenges

    Institute of Scientific and Technical Information of China (English)

    Sun Yanjun; Chen Xingeng; Bao Yun; Peng Xiaochun; Gao Changbo

    2005-01-01

    Strategic Environmental Assessment is a frontier subject in the field of Environmental Impact Assessment. In the past two decades, especially in recent years, much more importance has been attached to Strategic Environmental Assessment. The Environmental Impact Assessment Law of the P.R.China which was promulgated provides a great opportunity for the development of Planning Environmental Impact Assessment and brings great challenges for the development of traditional Project Environmental Impact Assessment and Planning Environmental Impact Assessment at the same time.In order to promote the implementation of"The EIA Law", the inherent limitations of Project Environmental Impact Assessment must be identified sufficiendy and the theory research and practice of Planning Environmental Impact Assessment should be strengthened as well. Measures should be taken currendy to enforce the operation system. The authors wish to offer a few references to the progress and implementation of Planning Environmental Impact Assessment in China.

  17. Monitoring and evaluation of Sustainable Energy Action Plan: Practice and perspective

    International Nuclear Information System (INIS)

    Delponte, Ilaria; Pittaluga, Ilaria; Schenone, Corrado

    2017-01-01

    The Sustainable Energy Action Plan (SEAP), promoted by the Covenant of Mayor, is a key tool for policies aimed at reducing fossil fuel consumption and GHG emissions, in accordance with the Kyoto protocol and its updates. To achieve an actual implementation of the SEAP and to obtain its expected targets, monitoring is a crucial component. SEAP monitoring has to look at both the progress of each single action and its global environmental effect, which requires more than one level of development. In the present paper, an integrated strategy for surveying, controlling and managing the SEAP through a “Monitoring and Evaluation” (M&E) process is introduced. The implementation in the city of Genoa, Italy, was used to test the efficacy of this approach and to assess its strengths and weaknesses. In particular, cost benefit analysis, bankability, peer review and participatory level were identified as key elements for obtaining an operative SEAP monitoring and for then fostering an effective environmental energy policy. Some recommendations were proposed to better outline the “Monitoring and Evaluation” methodology and to help other cities to define a strategy for SEAP monitoring and fulfilment. - Highlights: • SEAP monitoring is a key issue for urban energy policies. • Monitoring and evaluation for effective management of sustainable energy planning. • Lessons learned by monitoring the SEAP in the city of Genoa. • Monitoring strategy using CBA, bankability, peer reviewing and participatory level.

  18. Operational environmental monitoring plan for the waste isolation pilot plant

    International Nuclear Information System (INIS)

    Mercer, D.D.; Baker, P.L.; Cockman, J.S.; Fischer, N.T.; Flynn, D.T.; Harvill, J.P.; Knudtsen, K.L.; Louderbough, E.T.

    1989-01-01

    This plan defines the scope and extent of the WIPP effluent and environmental monitoring programs during the facility's operational life. It also discusses the quality assurance/quality control programs which ensure that samples collected and the resulting analytical data are representative of actual conditions at the WIPP site. This plan provides a comprehensive description of environmental activities at WIPP, including: a summary of environmental program information, including an update of the status of environmental permits and compliance activities; a description of the WIPP project and its mission; a description of the local environment, including demographics; a summary of applicable standards and regulatory requirements and brief discussions of potential exposure pathways, routine and accidental releases, and their consequences; a summary of the preoperational environmental monitoring and assessment activities and responses to the requirements (Appendix A) and guidelines presented in the ''Radiological Effluent Monitoring and Environmental Surveillance for US DOE Operations.'' 166 refs., 28 figs., 27 tabs

  19. Salton Sea ecosystem monitoring and assessment plan

    Science.gov (United States)

    Case(compiler), H. L.; Boles, Jerry; Delgado, Arturo; Nguyen, Thang; Osugi, Doug; Barnum, Douglas A.; Decker, Drew; Steinberg, Steven; Steinberg, Sheila; Keene, Charles; White, Kristina; Lupo, Tom; Gen, Sheldon; Baerenklau, Ken A.

    2013-01-01

    The Salton Sea, California’s largest lake, provides essential habitat for several fish and wildlife species and is an important cultural and recreational resource. It has no outlet, and dissolved salts contained in the inflows concentrate in the Salton Sea through evaporation. The salinity of the Salton Sea, which is currently nearly one and a half times the salinity of ocean water, has been increasing as a result of evaporative processes and low freshwater inputs. Further reductions in inflows from water conservation, recycling, and transfers will lower the level of the Salton Sea and accelerate the rate of salinity increases, reduce the suitability of fish and wildlife habitat, and affect air quality by exposing lakebed playa that could generate dust. Legislation enacted in 2003 to implement the Quantification Settlement Agreement (QSA) stated the Legislature’s intent for the State of California to undertake the restoration of the Salton Sea ecosystem. As required by the legislation, the California Resources Agency (now California Natural Resources Agency) produced the Salton Sea Ecosystem Restoration Study and final Programmatic Environmental Impact Report (PEIR; California Resources Agency, 2007) with the stated purpose to “develop a preferred alternative by exploring alternative ways to restore important ecological functions of the Salton Sea that have existed for about 100 years.” A decision regarding a preferred alternative currently resides with the California State Legislature (Legislature), which has yet to take action. As part of efforts to identify an ecosystem restoration program for the Salton Sea, and in anticipation of direction from the Legislature, the California Department of Water Resources (DWR), California Department of Fish and Wildlife (CDFW), U.S. Bureau of Reclamation (Reclamation), and U.S. Geological Survey (USGS) established a team to develop a monitoring and assessment plan (MAP). This plan is the product of that effort. The

  20. Auditory N1 reveals planning and monitoring processes during music performance.

    Science.gov (United States)

    Mathias, Brian; Gehring, William J; Palmer, Caroline

    2017-02-01

    The current study investigated the relationship between planning processes and feedback monitoring during music performance, a complex task in which performers prepare upcoming events while monitoring their sensory outcomes. Theories of action planning in auditory-motor production tasks propose that the planning of future events co-occurs with the perception of auditory feedback. This study investigated the neural correlates of planning and feedback monitoring by manipulating the contents of auditory feedback during music performance. Pianists memorized and performed melodies at a cued tempo in a synchronization-continuation task while the EEG was recorded. During performance, auditory feedback associated with single melody tones was occasionally substituted with tones corresponding to future (next), present (current), or past (previous) melody tones. Only future-oriented altered feedback disrupted behavior: Future-oriented feedback caused pianists to slow down on the subsequent tone more than past-oriented feedback, and amplitudes of the auditory N1 potential elicited by the tone immediately following the altered feedback were larger for future-oriented than for past-oriented or noncontextual (unrelated) altered feedback; larger N1 amplitudes were associated with greater slowing following altered feedback in the future condition only. Feedback-related negativities were elicited in all altered feedback conditions. In sum, behavioral and neural evidence suggests that future-oriented feedback disrupts performance more than past-oriented feedback, consistent with planning theories that posit similarity-based interference between feedback and planning contents. Neural sensory processing of auditory feedback, reflected in the N1 ERP, may serve as a marker for temporal disruption caused by altered auditory feedback in auditory-motor production tasks. © 2016 Society for Psychophysiological Research.

  1. BNL ENVIRONMENTAL MONITORING PLAN TRIENNIAL UPDATE, JANUARY 2003.

    Energy Technology Data Exchange (ETDEWEB)

    BROOKHAVEN NATIONAL LABORATORY

    2003-01-01

    Brookhaven National Laboratory (BNL) is a multi-program national laboratory operated by Brookhaven Science Associates for the U.S. Department of Energy (DOE) and is located on a 5,265-acre site in Suffolk County, Long Island, New York. BNL has a comprehensive Environmental Management System (EMS) in place, which meets the requirements of the International Organization for Standardization 14001 EMS Standard, as described in the BNL EMS Manual. BNL's extensive environmental monitoring program is one component of the EMS, and the BNL Environmental Monitoring Plan (EMP) describes this program in detail. The data derived from systematically monitoring the various environmental media on site enable BNL to make informed decisions concerning the protection of human health and the environment and to be responsive to community concerns.

  2. Revised ground-water monitoring compliance plan for the 300 area process trenches

    Energy Technology Data Exchange (ETDEWEB)

    Schalla, R.; Aaberg, R.L.; Bates, D.J.; Carlile, J.V.M.; Freshley, M.D.; Liikala, T.L.; Mitchell, P.J.; Olsen, K.B.; Rieger, J.T.

    1988-09-01

    This document contains ground-water monitoring plans for process-water disposal trenches located on the Hanford Site. These trenches, designated the 300 Area Process Trenches, have been used since 1973 for disposal of water that contains small quantities of both chemicals and radionuclides. The ground-water monitoring plans contained herein represent revision and expansion of an effort initiated in June 1985. At that time, a facility-specific monitoring program was implemented at the 300 Area Process Trenches as part of a regulatory compliance effort for hazardous chemicals being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interim-status facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The applicable monitoring requirements are described in the Resource Conservation and Recovery Act (RCRA), 40 CFR 265.90 of the federal regulations, and in WAC 173-303-400 of Washington State's regulations (Washington State Department of Ecology 1986). The program implemented for the process trenches was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. The plans for the program, contained in a document prepared by the US Department of Energy (USDOE) in 1985, called for monthly sampling of 14 of the 37 existing monitoring wells at the 300 Area plus the installation and sampling of 2 new wells. 27 refs., 25 figs., 15 tabs.

  3. The use of condition monitoring information for maintenance planning and decision-making

    Energy Technology Data Exchange (ETDEWEB)

    Laakso, K.; Rosqvist, T. [VTT Industrial Systems (Finland); Paulsen, J.L. [Risoe National Lab., Roskilde (Denmark)

    2002-12-01

    A survey is presented outlining the use of condition monitoring information in three Nordic nuclear power plants. The questions of the survey relate to the role of condition monitoring in strategic, as well as operative, maintenance planning and decision-making. The survey indicates that condition monitoring is increasingly implemented at nuclear power plants, but very selectively and in a rather slow pace for predictive maintenance. A combined strategy of condition based maintenance and predetermined preventive maintenance is applied for important equipment such as main circulation pumps and steam turbines. A realistic aim is to reduce the number of costly or error prone maintenance and disassembling inspection activities by condition monitoring given that the approach enables a good diagnosis and prediction. Systematic follow-up and analysis of such condition monitoring information followed by a case-specific planning and decision making of timely and rightly directed maintenance actions can justify an extension of the intervals of a number of predetermined inspection, maintenance or periodic testing tasks. (au)

  4. Test, Control and Monitor System (TCMS) operations plan

    Science.gov (United States)

    Macfarlane, C. K.; Conroy, M. P.

    1993-01-01

    The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.

  5. Evolving protected-area impacts in Panama: impact shifts show that plans require anticipation

    International Nuclear Information System (INIS)

    Haruna, Akiko; Pfaff, Alexander; Van den Ende, Sander; Joppa, Lucas

    2014-01-01

    Protected areas (PAs) are the leading forest conservation policy, so accurate evaluation of future PA impact is critical in conservation planning. Yet by necessity impact evaluations use past data. Here we argue that forward-looking plans should blend such evaluations with anticipation of shifts in threats. Applying improved methods to evaluate past impact, we provide rigorous support for that conceptual approach by showing that PAs’ impacts on deforestation shifted with land use. We study the Republic of Panama, where species-dense tropical forest faces real pressure. Facing variation in deforestation pressure, the PAs’ impacts varied across space and time. Thus, if shifts in pressure levels and patterns could be anticipated, that could raise impact. (paper)

  6. Predicting Plan Failure by Monitoring Action Sequences and Duration

    Directory of Open Access Journals (Sweden)

    Giovani Parente FARIAS

    2017-07-01

    Full Text Available An agent can attempt to achieve multiple goals and each goal can be achieved by applying various different plans. Anticipating failures in agent plan execution is important to enable an agent to develop strategies to avoid or circumvent such failures, allowing the agent to achieve its goal. Plan recognition can be used to infer which plans are being executed from observations of sequences of activities being performed by an agent. Symbolic Plan Recognition is an algorithm that represents knowledge about the agents under observation in the form of a plan library. In this work, we use this symbolic algorithm to find out which plan the agent is performing and we develop a failure prediction system, based on information available in the plan library and in a simplified calendar which manages the goals the agent has to achieve. This failure predictor is able to monitor the sequence of agent actions and detects if an action is taking too long or does not match the plan that the agent was expected to be performing. We have successfully employed this approach in a health-care prototype system.

  7. Environmental Monitoring Plan for the Oak Ridge Reservation, 2012

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, Sharon D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2012-10-01

    The purpose of Oak Ridge Reservation (ORR) environmental surveillance is to characterize radiological and nonradiological conditions of the off-site environs and estimate public doses related to these conditions, confirm estimations of public dose based on effluent monitoring data, and, where appropriate, provide supplemental data to support compliance monitoring for applicable environmental regulations. This environmental monitoring plan (EMP) is intended to document the rationale, frequency, parameters, and analytical methods for the ORR environmental surveillance program and provides information on ORR site characteristics, environmental pathways, dose assessment methods, and quality management. ORR-wide environmental monitoring activities include a variety of media including air, surface water, vegetation, biota, and wildlife. In addition to these activities, site-specific effluent, groundwater, and best management monitoring programs are conducted at the Oak Ridge National Laboratory (ORNL), the Y-12 National Security Complex (Y-12), and the East Tennessee Technology Park (ETTP). This is revision 5.

  8. Uranium Mill Tailings Remedial Action Project Environmental Monitoring Plan

    International Nuclear Information System (INIS)

    1992-11-01

    The Department of Energy (DOE) has issued requirements for complying with DOLE and other Federal agency environmental regulations. DOE Order 5400.1 requires environmental monitoring plans for each DOE operation that uses, generates, releases, or manages pollutants of radioactive and hazardous materials

  9. Terrestrial Steering Group. 2014. Arctic Terrestrial Biodiversity Monitoring Plan

    DEFF Research Database (Denmark)

    Aastrup, Peter; Aronsson, Mora; Barry, Tom

    capacity and information may be currently available and (b) to outline near-term required steps to begin implementing the plan and reporting on an initial set of Arctic terrestrial biodiversity focal ecosystem component attributes. The specific objectives of the workshop were to: Identify key products...... for TSG for the next two years. Identify key components of a pan-Arctic status report for priority focal ecosystem components (FEC) attributes for policy and decision makers. Develop a prioritized set of activities to meet reporting objectives. Identify key milestones and timelines for the successful...... implementation of the Arctic Terrestrial Biodiversity Monitoring Plan for the next two years. Identify expert networks required for successful implementation of the plan. Identify key gaps and opportunities for the TSG related to plan implementation and identify near-term next steps to address gaps....

  10. Department of Energy – Office of Science Pacific Northwest Site Office Environmental Monitoring Plan for the DOE-SC PNNL Site

    Energy Technology Data Exchange (ETDEWEB)

    Snyder, Sandra F.; Meier, Kirsten M.; Barnett, J. Matthew; Bisping, Lynn E.; Poston, Ted M.; Rhoads, Kathleen

    2011-12-21

    The Pacific Northwest Site Office (PNSO) manages the contract for operations at the U.S. Depart¬ment of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site in Richland, Washington. Radiological operations at the DOE-SC PNNL Site expanded in 2010 with the completion of facilities at the Physical Sciences Facility. As a result of the expanded radiological work at the site, the Washington State Department of Health (WDOH) has required that offsite environmental surveillance be conducted as part of the PNNL Site Radioactive Air Emissions License. The environ¬mental monitoring and surveillance requirements of various orders, regulations, and guidance documents consider emission levels and subsequent risk of negative human and environmental impacts. This Environmental Monitoring Plan (EMP) describes air surveillance activities at the DOE-SC PNNL Site. The determination of offsite environmental surveillance needs evolved out of a Data Quality Objectives process (Barnett et al. 2010) and Implementation Plan (Snyder et al. 2010). The entire EMP is a compilation of several documents, which include the Main Document (this text), Attachment 1: Sampling and Analysis Plan, Attachment 2: Data Management Plan, and Attachment 3: Dose Assessment Guidance.

  11. Groundwater Monitoring Plan for the Z-Area Saltstone Disposal Facility, Revision 3

    International Nuclear Information System (INIS)

    WELLS, DANIEL

    2005-01-01

    Groundwater monitoring has been conducted at the Z-Area Saltstone Disposal Facility since 1987. At that time, groundwater monitoring was not required by the industrial landfill regulations, but a modest monitoring program was required by the operating permit. At the time of the 1996 permit renewal, it was determined that a more robust monitoring program was needed. The draft permit required new monitoring wells within 25 feet of each active disposal cell. As an alternative, SRS proposed a program based on direct push sampling. This program called for biennial direct push sampling within 25 feet of each waste-containing cell with additional samples being taken in areas where excessive cracking had been observed. The direct push proposal was accepted by The South Carolina Department of Health and Environmental Control (SCDHEC), and was incorporated by reference into the Z-Area Saltstone Industrial Solid Waste Permit, No.025500-1603. The Industrial Solid Waste Landfill Regulations were revised in 1998 and now include specific requirements for groundwater monitoring. SRS's plan for complying with those regulations is discussed below. The plan calls for a return to traditional monitoring with permanent wells. It also proposes a more technically sound monitoring list based on the actual composition of saltstone

  12. Sampling and Analysis Plan Update for Groundwater Monitoring 1100-EM-1 Operable Unit

    International Nuclear Information System (INIS)

    DR Newcomer

    1999-01-01

    This document updates the sampling and analysis plan (Department of Energy/Richland Operations--95-50) to reflect current groundwater monitoring at the 1100-EM-1Operable Unit. Items requiring updating included sampling and analysis protocol, quality assurance and quality control, groundwater level measurement procedure, and data management. The plan covers groundwater monitoring, as specified in the 1993 Record of Decision, during the 5-year review period from 1995 through 1999. Following the 5-year review period, groundwater-monitoring data will be reviewed by Environmental Protection Agency to evaluate the progress of natural attenuation of trichloroethylene. Monitored natural attenuation and institutional controls for groundwater use at the inactive Horn Rapids Landfill was the selected remedy specified in the Record of Decision

  13. Test plan for demonstration of Rapid Transuranic Monitoring Laboratory

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1993-06-01

    This plan describes tests to demonstrate the capability of the Rapid Transuranic Monitoring Laboratory (RTML) to monitor airborne alpha-emitting radionuclides and analyze soil, smear, and filter samples for alpha- and gamma-emitting radionuclides under field conditions. The RTML will be tested during June 1993 at a site adjacent to the Cold Test Pit at the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. Measurement systems installed in the RTML that will be demonstrated include two large-area ionization chamber alpha spectrometers, an x-ray/gamma-ray spectrometer, and four alpha continuous air monitors. Test objectives, requirements for data quality, experimental apparatus and procedures, and safety and logistics issues are described

  14. Field testing plan for unsaturated zone monitoring and field studies

    International Nuclear Information System (INIS)

    Young, M.H.; Wierenga, P.J.; Warrick, A.W.

    1996-10-01

    The University of Arizona, in cooperation with the Bureau of Economic Geology at The University of Texas at Austin, and Stephens and Associates in Albuquerque, New Mexico has developed a field testing plan for evaluating subsurface monitoring systems. The U.S. Nuclear Regulatory Commission has requested development of these testing plans for low-level radioactive waste disposal sites (LLW) and for monitoring at decommissioned facilities designated under the open-quotes Site Decommissioning Management Planclose quotes (SDMP). The tests are conducted on a 50 m by 50 m plot on the University of Arizona's Maricopa Agricultural Center. Within the 50 m by 50 m plot one finds: (1) an instrumented buried trench, (2) monitoring islands similar to those proposed for the Ward Valley, California LLW Facility, (3) deep borehole monitoring sites, (4) gaseous transport monitoring, and (5) locations for testing non-invasive geophysical measurement techniques. The various subplot areas are instrumented with commercially available instruments such as neutron probes, time domain reflectometry probes, tensiometers, psychrometers, heat dissipation sensors, thermocouples, solution samplers, and cross-hole geophysics electrodes. Measurement depths vary from ground surface to 15 m. The data from the controlled flow and transport experiments, conducted over the plot, will be used to develop an integrated approach to long-term monitoring of the vadose zone at waste disposal sites. The data will also be used to test field-scale flow and transport models. This report describes in detail the design of the experiment and the methodology proposed for evaluating the data

  15. Development of environmental impact monitoring protocol for offshore carbon capture and storage (CCS): A biological perspective

    International Nuclear Information System (INIS)

    Kim, Hyewon; Kim, Yong Hoon; Kang, Seong-Gil; Park, Young-Gyu

    2016-01-01

    Offshore geologic storage of carbon dioxide (CO_2), known as offshore carbon capture and sequestration (CCS), has been under active investigation as a safe, effective mitigation option for reducing CO_2 levels from anthropogenic fossil fuel burning and climate change. Along with increasing trends in implementation plans and related logistics on offshore CCS, thorough risk assessment (i.e. environmental impact monitoring) needs to be conducted to evaluate potential risks, such as CO_2 gas leakage at injection sites. Gas leaks from offshore CCS may affect the physiology of marine organisms and disrupt certain ecosystem functions, thereby posing an environmental risk. Here, we synthesize current knowledge on environmental impact monitoring of offshore CCS with an emphasis on biological aspects and provide suggestions for better practice. Based on our critical review of preexisting literatures, this paper: 1) discusses key variables sensitive to or indicative of gas leakage by summarizing physico-chemical and ecological variables measured from previous monitoring cruises on offshore CCS; 2) lists ecosystem and organism responses to a similar environmental condition to CO_2 leakage and associated impacts, such as ocean acidification and hypercapnia, to predict how they serve as responsive indicators of short- and long-term gas exposure, and 3) discusses the designs of the artificial gas release experiments in fields and the best model simulation to produce realistic leakage scenarios in marine ecosystems. Based on our analysis, we suggest that proper incorporation of biological aspects will provide successful and robust long-term monitoring strategies with earlier detection of gas leakage, thus reducing the risks associated with offshore CCS. - Highlights: • This paper synthesizes the current knowledge on environmental impact monitoring of offshore Carbon Capture and Sequestration (CCS). • Impacts of CO_2 leakage (ocean acidification, hypercapnia) on marine

  16. Development of environmental impact monitoring protocol for offshore carbon capture and storage (CCS): A biological perspective

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Hyewon, E-mail: hyewon@ldeo.columbia.edu [Division of Biology and Paleo Environment, Lamont-Doherty Earth Observatory, Columbia University, Palisades, NY 10964 (United States); Kim, Yong Hoon, E-mail: Yong.Kim@rpsgroup.com [RPS ASA, 55 Village Square Drive, South Kingstown, RI 02879 (United States); Kang, Seong-Gil, E-mail: kangsg@kriso.re.kr [Offshore CCS Research Unit, Korea Research Institute of Ships and Ocean Engineering, 32 1312 Beon-gil, Yuseong-daero, Yuseong-gu, Deaejeon (Korea, Republic of); Park, Young-Gyu, E-mail: ypark@kiost.ac.kr [Ocean Circulation and Climate Change Research Center, Korea Institute of Ocean Science and Technology, 787 Haeanro, Ansan (Korea, Republic of)

    2016-02-15

    Offshore geologic storage of carbon dioxide (CO{sub 2}), known as offshore carbon capture and sequestration (CCS), has been under active investigation as a safe, effective mitigation option for reducing CO{sub 2} levels from anthropogenic fossil fuel burning and climate change. Along with increasing trends in implementation plans and related logistics on offshore CCS, thorough risk assessment (i.e. environmental impact monitoring) needs to be conducted to evaluate potential risks, such as CO{sub 2} gas leakage at injection sites. Gas leaks from offshore CCS may affect the physiology of marine organisms and disrupt certain ecosystem functions, thereby posing an environmental risk. Here, we synthesize current knowledge on environmental impact monitoring of offshore CCS with an emphasis on biological aspects and provide suggestions for better practice. Based on our critical review of preexisting literatures, this paper: 1) discusses key variables sensitive to or indicative of gas leakage by summarizing physico-chemical and ecological variables measured from previous monitoring cruises on offshore CCS; 2) lists ecosystem and organism responses to a similar environmental condition to CO{sub 2} leakage and associated impacts, such as ocean acidification and hypercapnia, to predict how they serve as responsive indicators of short- and long-term gas exposure, and 3) discusses the designs of the artificial gas release experiments in fields and the best model simulation to produce realistic leakage scenarios in marine ecosystems. Based on our analysis, we suggest that proper incorporation of biological aspects will provide successful and robust long-term monitoring strategies with earlier detection of gas leakage, thus reducing the risks associated with offshore CCS. - Highlights: • This paper synthesizes the current knowledge on environmental impact monitoring of offshore Carbon Capture and Sequestration (CCS). • Impacts of CO{sub 2} leakage (ocean acidification

  17. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  18. Surveillance Plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Surveillance Plan has been developed as part of the Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee. Environmental monitoring will be conducted in two phases: the baseline monitoring phase and the routine annual monitoring phase. The baseline monitoring phase will be conducted to establish the baseline contaminant release conditions at the Waste Area Grouping (WAG), to confirm the site-related chemicals of concern (COC), and to gather data to confirm the site hydrologic model The baseline monitoring phase is expected to begin in 1994 and continue for 12--18 months. The routine annual monitoring phase will consist of continued sampling and analyses of COC to determine off-WAG contaminant flux, to identify trends in releases, and to confirm the COC The routine annual monitoring phase will continue for ∼4 years after completion of the baseline monitoring phase. This Surveillance Plan presents the technical and quality assurance surveillance activities for the various WAG 6 environmental monitoring and data evaluation plans and implementing procedures

  19. Evaluating California local land use plan's environmental impact reports

    International Nuclear Information System (INIS)

    Tang Zhenghong; Bright, Elise; Brody, Samuel

    2009-01-01

    Local land use planning has profound impacts on environmental quality; however, few empirical studies have been conducted to systematically measure local land use plans' environmental assessment quality and to identify the factors influencing it. This paper analyzes the quality of 40 Environmental Impact Reports (EIRs) of local jurisdictions' land use plans in California. A plan evaluation protocol defined by five core components and sixty-three indicators is developed to measure the quality of local land use plans' EIRs. The descriptive results indicate that the local jurisdictions produce relatively good quality on its EIRs, but there is still much room for improvement. There are large variations in the quality of EIRs across local jurisdictions. The regression results further highlight three major factors that can significantly influence local land use plan's EIR quality: number of planners, plan updating ability, and development pressure

  20. A systematic approach to the planning, implementation, monitoring, and evaluation of integrated health services.

    Science.gov (United States)

    Reynolds, Heidi W; Sutherland, Elizabeth G

    2013-05-06

    Because of the current emphasis and enthusiasm focused on integration of health systems, there is a risk of piling resources into integrated strategies without the necessary systems in place to monitor their progress adequately or to measure impact, and to learn from these efforts. The rush to intervene without adequate monitoring and evaluation will continue to result in a weak evidence base for decision making and resource allocation. Program planning and implementation are inextricability linked to monitoring and evaluation. Country level guidance is needed to identify country-specific integrated strategies, thereby increasing country ownership. This paper focuses on integrated health services but takes into account how health services are influenced by the health system, managed by programs, and made up of interventions. We apply the principles in existing comprehensive monitoring and evaluation (M&E) frameworks in order to outline a systematic approach to the M&E of integration for the country level. The approach is grounded by first defining the country-specific health challenges that integration is intended to affect. Priority points of contact for care can directly influence health, and essential packages of integration for all major client presentations need to be defined. Logic models are necessary to outline the plausible causal pathways and define the inputs, roles and responsibilities, indicators, and data sources across the health system. Finally, we recommend improvements to the health information system and in data use to ensure that data are available to inform decisions, because changes in the M&E function to make it more integrated will also facilitate integration in the service delivery, planning, and governance components. This approach described in the paper is the ideal, but its application at the country level can help reveal gaps and guide decisions related to what health services to prioritize for integration, help plan for how to

  1. 75 FR 4842 - Winter Use Plan, Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2010-01-29

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Environmental Impact Statement... to prepare an Environmental Impact Statement for a Winter Use Plan, Yellowstone National Park... Park Service (NPS) is preparing an Environmental Impact Statement (EIS) for a Winter Use Plan for...

  2. Monitoring well installation plan for the Department of Energy Y-12 Plant, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1997-09-01

    The installation and development of groundwater monitoring wells is a primary element of the Y-12 Plant Groundwater Protection Program (GWPP), which monitors groundwater quality and hydrologic conditions at the Oak Ridge Y-12 Plant. This document is a groundwater monitoring well installation and development plan for the US Department of Energy (DOE) Y-12 Plant located in Oak Ridge, Tennessee. This plan formalizes well installation and construction methods, well development methods, and core drilling methods that are currently implemented at the Y-12 Plant under the auspices of the GWPP. Every three years, this plan will undergo a review, during which revisions necessitated by changes in regulatory requirements or GWPP objectives may be made

  3. Comparison of monitor units calculated by radiotherapy treatment planning system and an independent monitor unit verification software.

    Science.gov (United States)

    Sellakumar, P; Arun, C; Sanjay, S S; Ramesh, S B

    2011-01-01

    In radiation therapy, the monitor units (MU) needed to deliver a treatment plan are calculated by treatment planning systems (TPS). The essential part of quality assurance is to verify the MU with independent monitor unit calculation to correct any potential errors prior to the start of treatment. In this study, we have compared the MU calculated by TPS and by independent MU verification software. The MU verification software was commissioned and tested for the data integrity to ensure that the correct beam data was considered for MU calculations. The accuracy of the calculations was tested by creating a series of test plans and comparing them with ion chamber measurements. The results show that there is good agreement between the two. The MU difference (MUdiff) between the monitor unit calculations of TPS and independent MU verification system was calculated for 623 fields from 245 patients and was analyzed by treatment site for head & neck, thorax, breast, abdomen and pelvis. The mean MUdiff of -0.838% with a standard deviation of 3.04% was observed for all 623 fields. The site specific standard deviation of MUdiff was as follows: abdomen and pelvis (<1.75%), head & neck (2.5%), thorax (2.32%) and breast (6.01%). The disparities were analyzed and different correction methods were used to reduce the disparity. © 2010 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  4. 78 FR 23491 - National Forest System Land Management Planning; Correction

    Science.gov (United States)

    2013-04-19

    ... Management Planning; Correction AGENCY: Forest Service, USDA. ACTION: Correcting amendment. SUMMARY: This..., revising, and monitoring land management plans (the planning rule). The National Forest Management Act... Land Management Planning Rule Final Programmatic Environmental Impact Statement of January 2012. List...

  5. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    International Nuclear Information System (INIS)

    Shields, K.D.; Ballinger, M.Y.

    1999-03-01

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities

  6. Facility Effluent Monitoring Plan for the 325 Radiochemical Processing Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Shields, K.D.; Ballinger, M.Y.

    1999-04-02

    This Facility Effluent Monitoring Plan (FEMP) has been prepared for the 325 Building Radiochemical Processing Laboratory (RPL) at the Pacific Northwest National Laboratory (PNNL) to meet the requirements in DOE Order 5400.1, ''General Environmental Protection Programs.'' This FEMP has been prepared for the RPL primarily because it has a ''major'' (potential to emit >0.1 mrem/yr) emission point for radionuclide air emissions according to the annual National Emission Standards for Hazardous Air Pollutants (NESHAP) assessment performed. This section summarizes the airborne and liquid effluents and the inventory based NESHAP assessment for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements. The RPL at PNNL houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and radioactive mixed waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities within the building include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials and a waste treatment facility for processing hazardous, mixed radioactive, low-level radioactive, and transuranic wastes generated by PNNL activities.

  7. Development of a pan-Arctic monitoring plan for polar bears: Background paper

    Science.gov (United States)

    Vongraven, Dag; Peacock, Lily

    2011-01-01

    bears, with particular emphasis on how climate warming may differentially affect populations and habitats. Current knowledge is inadequate for a comprehensive understanding of the present and future impact of climate warming and its interaction with other stressors. The cumulative effects are unknown (Laidre et al. 2008). An integrated pan-Arctic research and monitoring plan will improve the ability to detect future trends, identify the most vulnerable subpopulations and guide effective conservation. There is a need to direct attention and resources where data are deficient to understand the mechanisms that drive trends, and to facilitate more effective and timely conservation response.

  8. Evaluation of Monticello Nuclear Power Plant, Environmental Impact Prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Watson, D.G.

    1976-11-01

    This report evaluates quantitatively the nonradiological environmental monitoring programs at Monticello Nuclear Generating Plant. The general objective of the study is to assess the effectiveness of monitoring programs in the measurement of environmental impacts. Specific objectives include the following: (1) Assess the validity of environmental impact predictions made in the Environmental Statement by analysis of nonradiological monitoring data; (2) evaluate the general adequacy of environmental monitoring programs for detecting impacts and their responsiveness to Technical Specifications objectives; (3) assess the adequacy of preoperational monitoring programs in providing a sufficient data base for evaluating operational impacts; (4) identify possible impacts that were not predicted in the environmental statement and identify monitoring activities that need to be added, modified or deleted; and (5) assist in identifying environmental impacts, monitoring methods, and measurement problems that need additional research before quantitative predictions can be attempted. Preoperational as well as operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the analytical methods used to measure ecological and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data were available

  9. 40 CFR 265 interim-status ground-water monitoring plan for the 2101-M pond

    International Nuclear Information System (INIS)

    Chamness, M.A.; Luttrell, S.P.; Dudziak, S.

    1989-03-01

    This report outlines a ground-water monitoring plan for the 2101-M pond, located in the southwestern part of the 200-East Area on the Hanford Site in south-central Washington State. It has been determined that hazardous materials may have been discharged to the pond. Installation of an interim-status ground-water monitoring system is required under the Resource Conservation and Recovery Act to determine if hazardous chemicals are moving out of the pond. This plan describes the location of new wells for the monitoring system, how the wells are to be completed, the data to be collected, and how those data can be used to determine the source and extent of any ground-water contamination from the 2101-M pond. Four new wells are planned, one upgradient and three downgradient. 35 refs., 12 figs., 9 tabs

  10. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex

    International Nuclear Information System (INIS)

    2006-01-01

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted ''inactive'' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on the

  11. The Security Plan for the Joint Euratom/IAEA Remote Monitoring Network

    International Nuclear Information System (INIS)

    Stronkhorst, J.; Schoop, K.; Ruuska, K.; Kurek, S.; Levert, J.F.

    2015-01-01

    The European Commission and the IAEA have installed surveillance systems in all larger civil European nuclear facilities. The monitoring data is gathered by optical surveillance systems, electronic sealing systems and numerous measuring devices. The on-site joint Euratom/IAEA monitoring networks operate in general completely isolated from the operator's IT systems. To largely improve data security and reliability, remote data transmission (RDT) is installed on a growing number of sites, and the inspection data is daily transferred to the Data Collect Servers in Luxembourg and Vienna. A growing number of RDT connections and a growing number of security threats require an IT security policy that is pro-active as well as reactive in an efficient way. The risk based approach used in setting up the security plans assesses all elements of the monitoring network, from the implemented technical solution and the assessment of the security needs and threats, up to the incident handling and lessons learned. The results of the assessments are, for each individual RDT connection, described in the technical paragraphs and annexes, including system descriptions, network plans and contact information. The principles of secure data handling as implemented in the shared Euratom /IAEA monitoring network can apply to a broad range of industrial monitoring systems, where human interaction is in general the largest security risk. (author)

  12. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    Sweeney, M.D.

    1995-06-13

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations.

  13. Interim-status groundwater monitoring plan for the 216-B-63 trench. Revision 1

    International Nuclear Information System (INIS)

    Sweeney, M.D.

    1995-01-01

    This document outlines the groundwater monitoring plan for interim-status detection-level monitoring of the 216-B-63 Trench. This is a revision of the initial groundwater monitoring plan prepared for Westinghouse Hanford Company (WHC) by Bjornstad and Dudziak (1989). The 216-B-63 Trench, located at the Hanford Site in south-central Washington State, is an open, unlined, earthern trench approximately 1.2 m (4 ft) wide at the bottom, 427 m (1400 ft) long, and 3 m (10 ft) deep that received wastewater containing hazardous waste and radioactive materials from B Plant, located in the 200 East Area. Liquid effluent discharge to the 216-B-63 Trench began in March 1970 and ceased in February 1992. The trench is now managed by Waste Tank Operations

  14. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    International Nuclear Information System (INIS)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site

  15. Quality Assurance Program Plan for radionuclide airborne emissions monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Vance, L.M.

    1993-07-01

    This Quality Assurance Program Plan (QAPP) describes the quality assurance requirements and responsibilities for radioactive airborne emissions measurements activities from regulated stacks are controlled at the Hanford Site. Detailed monitoring requirements apply to stacks exceeding 1% of the standard of 10 mrem annual effective dose equivalent to the maximally exposed individual from operations of the Hanford Site.

  16. 77 FR 40860 - Strategic Plan for Federal Research and Monitoring of Ocean Acidification

    Science.gov (United States)

    2012-07-11

    ... Plan for Federal Research and Monitoring of Ocean Acidification AGENCY: National Marine Fisheries... Federal Research and Monitoring of Ocean Acidification is being made available for public review and... understanding of the process of ocean acidification, its effects on marine ecosystems, and the steps that could...

  17. Implementation Plan. Environmental Restoration and Waste Management Programmatic Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    1994-01-01

    In accordance with the Department of Energy`s National Environmental Policy Act implementing procedures in Volume 10 of the Code of Federal Regulations, Section 1021,312, the Environmental Restoration and Waste Management Programmatic Environmental Impact Statement Implementation Plan has two primary purposes: to provide guidance for the preparation of the Programmatic Environmental Impact Statement and to record the issues resulting from the scoping and the extended public participation process. The Implementation Plan identifies and discusses the following: background of Environmental Restoration and Waste Management activities, the purpose of the Programmatic Environmental Impact Statement, and the relationship of the Programmatic Environmental Impact Statement to other Departmental initiatives (Chapter 1); need and purposes for action (Chapter 2); scoping process and results of the public participation program in defining the scope of the Programmatic Environmental Impact Statement, including a summary of the comments received and their disposition (Chapter 3); planned scope and content of the Programmatic Environmental Impact Statement (Chapter 4); consultations with other agencies and the role of cooperating agencies (Chapter 5); planned schedule of major Programmatic Environmental Impact Statement milestones (Chapter 6); and responsibilities for preparation of the Programmatic Environmental Impact Statement (Chapter 7).

  18. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6.

  19. Groundwater level monitoring sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-04-01

    This Sampling and Analysis Plan addresses groundwater level monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. Groundwater level monitoring will be conducted at 129 sites within the WAG. All of the sites will be manually monitored on a semiannual basis. Forty-five of the 128 wells, plus one site in White Oak Lake, will also be equipped with automatic water level monitoring equipment. The 46 sites are divided into three groups. One group will be equipped for continuous monitoring of water level, conductivity, and temperature. The other two groups will be equipped for continuous monitoring of water level only. The equipment will be rotated between the two groups. The data collected from the water level monitoring will be used to support determination of the contaminant flux at WAG 6

  20. Integrating impact assessment and conflict management in urban planning: Experiences from Finland

    International Nuclear Information System (INIS)

    Peltonen, Lasse; Sairinen, Rauno

    2010-01-01

    The article examines the interlinkages between recent developments in conflict management and impact assessment procedures in the context of urban planning in Finland. It sets out by introducing the fields of impact assessment and conflict mediation. It then proceeds to discuss the development of impact assessment practices and the status of conflict mediation in Finnish land use planning. The case of Korteniitty infill development plan in Jyvaeskylae is used to demonstrate how the Finnish planning system operates in conflict situations - and how social impact assessment can contribute to managing planning conflicts. The authors ask how the processes of impact assessment contribute to conflict management. Based on the Finnish experience, it is argued that social impact assessment of land use plans can contribute to conflict management, especially in the absence of institutionalised conflict mediation processes. In addition, SIA may acquire features of conflict mediation, depending on extent and intensity of stakeholder participation in the process, and the quality of linkages it between knowledge production and decision-making. Simultaneously, conflict mediation practices and theoretical insights can inform the application of SIA to help it address land use conflicts more consciously.

  1. Environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1995-09-01

    This document presents an Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG 6) at Oak Ridge National Laboratory (ORNL). This document updates a draft monitoring plan developed in 1993. The draft plan was never finalized awaiting resolution of the mechanisms for addressing RCRA concerns at a site where the CERCLA process resulted in a decision to defer action, i.e., postpone closure indefinitely. Over the past two years the Tennessee Department of Environment and Conservation (TDEC), US Department of Energy (DOE), and US Environmental Protection Agency (EPA) Region IV, have agreed that RCRA authority at the site will be maintained through a post- closure permit; ''closure'' in this case referring to deferred action. Both a Revised Closure Plan (DOE 1995a) and a Post-Closure Permit Application (DOE 1995b) have been developed to document this agreement; relevant portions of the EMP will be included in the RCRA Post-Closure Permit Application. As the RCRA issues were being negotiated, DOE initiated monitoring at WAG 6. The purpose of the monitoring activities was to (1) continue to comply with RCRA groundwater quality assessment requirements, (2) install new monitoring equipment, and (3) establish the baseline conditions at WAG 6 against which changes in contaminant releases could be measured. Baseline monitoring is scheduled to end September 30, 1995. Activities that have taken place over the past two years are summarized in this document

  2. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    RCRA & Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP.

  3. RCRA and operational monitoring 1994 fiscal year work plan, WBS 1.5.3

    International Nuclear Information System (INIS)

    1993-12-01

    RCRA ampersand Operational Monitoring (ROM) Program Office manages the direct funded Resource Conservation Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.5.3. The ROM Program Office is a Branch of liquid Waste Disposal, a part of Restoration and Remediation of Westinghouse Hanford Company (WHC). The Fiscal Year Work Plan (FYWP) takes it direction from the Multi-Year Program Plan (MYPP). The FYWP provides the near term, enhanced details for the Program Office to use as baseline Cost, Scope and Schedule. Changs Control administered during the fiscal year is against the baseline provided by the FYWP

  4. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  5. A state-impact-state methodology for assessing environmental impact in land use planning

    International Nuclear Information System (INIS)

    Chen, Longgao; Yang, Xiaoyan; Chen, Longqian; Potter, Rebecca; Li, Yingkui

    2014-01-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level

  6. A state-impact-state methodology for assessing environmental impact in land use planning

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); Yang, Xiaoyan [Institute of land resources, Jiangsu Normal University, Xuzhou 221116 (China); School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian, E-mail: cumt_chenlongqian@163.com [School of Environmental Science and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Potter, Rebecca; Li, Yingkui [Department of Geography, University of Tennessee, Knoxville, TN 37996 (United States)

    2014-04-01

    The implementation of land use planning (LUP) has a large impact on environmental quality. There lacks a widely accepted and consolidated approach to assess the LUP environmental impact using Strategic Environmental Assessment (SEA). In this paper, we developed a state-impact-state (SIS) model employed in the LUP environmental impact assessment (LUPEA). With the usage of Matter-element (ME) and Extenics method, the methodology based on the SIS model was established and applied in the LUPEA of Zoucheng County, China. The results show that: (1) this methodology provides an intuitive and easy understanding logical model for both the theoretical analysis and application of LUPEA; (2) the spatial multi-temporal assessment from base year, near-future year to planning target year suggests the positive impact on the environmental quality in the whole County despite certain environmental degradation in some towns; (3) besides the spatial assessment, other achievements including the environmental elements influenced by land use and their weights, the identification of key indicators in LUPEA, and the appropriate environmental mitigation measures were obtained; and (4) this methodology can be used to achieve multi-temporal assessment of LUP environmental impact of County or Town level in other areas. - Highlights: • A State-Impact-State model for Land Use Planning Environmental Assessment (LUPEA). • Matter-element (ME) and Extenics methods were embedded in the LUPEA. • The model was applied to the LUPEA of Zoucheng County. • The assessment shows improving environment quality since 2000 in Zoucheng County. • The method provides a useful tool for the LUPEA in the county level.

  7. Measuring the Impacts of Water Safety Plans in the Asia-Pacific Region

    Directory of Open Access Journals (Sweden)

    Emily Kumpel

    2018-06-01

    Full Text Available This study investigated the effectiveness of Water Safety Plans (WSP implemented in 99 water supply systems across 12 countries in the Asia-Pacific region. An impact assessment methodology including 36 indicators was developed based on a conceptual framework proposed by the Center for Disease Control (CDC and before/after data were collected between November 2014 and June 2016. WSPs were associated with infrastructure improvements at the vast majority (82 of participating sites and to increased financial support at 37 sites. In addition, significant changes were observed in operations and management practices, number of water safety-related meetings, unaccounted-for water, water quality testing activities, and monitoring of consumer satisfaction. However, the study also revealed challenges in the implementation of WSPs, including financial constraints and insufficient capacity. Finally, this study provided an opportunity to test the impact assessment methodology itself, and a series of recommendations are made to improve the approach (indicators, study design, data collection methods for evaluating WSPs.

  8. Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-09-30

    This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure 1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 which provide the most useful hydrologic and water-quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted ''active'' status are used by the GWPP for hydrologic monitoring and/or groundwater sampling (Section 3.0), whereas well granted ''inactive'' status are not used for either purpose. The status designation also determines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 4.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 5.0). This plan applies to groundwater monitoring wells associated with Y-12 and related waste management facilities located within three hydrogeologic regimes (Figure 1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime is directly south of Y-12 and encompasses a section of Chestnut Ridge that is bound to the

  9. Vadose zone monitoring plan using geophysical nuclear logging for radionuclides discharged to Hanford liquid waste disposal facilities

    International Nuclear Information System (INIS)

    Price, R.K.

    1995-11-01

    During plutonium production at Hanford, large quantities of hazardous and radioactive liquid effluent waste have been discharged to the subsurface (vadose zone). These discharges at over 330 liquid effluent disposal facilities (ie. cribs, ditches, and ponds) account for over 3,000,000 curies of radioactive waste released into the subsurface. It is estimated that 10% of the contaminants have reached the groundwater in many places. Continuing migration may further impact groundwater quality in the future. Through the RCRA Operational Monitoring Program, a Radionuclide Logging System (RLS) has been obtained by Hanford Technical Services (HTS) and enhanced to measure the distribution of contaminants and monitor radionuclide movement in existing groundwater and vadose zone boreholes. Approximately 100 wells are logged by HTS each year in this program. In some cases, movement has been observed years after discharges were terminated. A similar program is in place to monitor the vadose zone at the Tank Farms. This monitoring plan describes Hanford Programs for monitoring the movement of radioactive contamination in the vadose zone. Program background, drivers, and strategy are presented. The objective of this program is to ensure that DOE-RL is aware of any migration of contaminants in the vadose zone, such that groundwater can be protected and early actions can be taken as needed

  10. Accounting for uncertainty in evaluating water quality impacts of urban development plan

    International Nuclear Information System (INIS)

    Zhou Jiquan; Liu Yi; Chen Jining

    2010-01-01

    The implementation of urban development plans causes land use change, which can have significant environmental impacts. In light of this, environmental concerns should be considered sufficiently at an early stage of the planning process. However, uncertainties existing in urban development plans hamper the application of strategic environmental assessment, which is applied to evaluate the environmental impacts of policies, plans and programs. This study develops an integrated assessment method based on accounting uncertainty of environmental impacts. And the proposed method consists of four main steps: (1) designing scenarios of economic scale and industrial structure, (2) sampling for possible land use layouts, (3) evaluating each sample's environmental impact, and (4) identifying environmentally sensitive industries. In doing so, uncertainties of environmental impacts can be accounted. Then environmental risk, overall environmental pressure and potential extreme environmental impact of urban development plans can be analyzed, and environmentally sensitive factors can be identified, especially under considerations of uncertainties. It can help decision-makers enhance environmental consideration and take measures in the early stage of decision-making.

  11. Sustainable Impact of Landfill Siting towards Urban Planning in Malaysia

    Science.gov (United States)

    Sin Tey, Jia; Goh, Kai Chen; Ern Ang, Peniel Soon

    2017-10-01

    Landfill is one of the most common, widely used waste management technique in Malaysia. The ever increasing of solid waste has made the role of landfill become prominent despite the negative impacts that caused by the landfill is unavoidable. The public and government regulations are getting more aware with the negative impacts that could be brought by the landfill towards the community. It led to the cultural shift to integrate the concept of sustainability into the planning of siting a landfill in an urban area. However, current urban planning tends to emphasize more on the environmental aspect instead of social and economic aspects. This is due to the existing planning guidelines and stakeholder’s understandings are more on the environmental aspect. This led to the needs of incorporating the concept of sustainability into the urban planning. Thus, this paper focuses on the industry stakeholders view on the negative impacts that will cause by the landfill towards the urban planning. The industry stakeholders are those who are related to the decision-making in the selection of a landfill site in the government department. The scope of the study is within the country of Malaysia. This study was conducted through the semi-structured interviews with a total of fifteen industry stakeholders to obtain their perspective on the issues of impacts of siting a landfill in the urban area. The data obtained was analysed using the software, QSR NVivo version 10. Results indicate that landfill bought significant sustainability-related impacts towards landfill siting in urban planning. The negative impacts stated by the respondents are categorized under all three sustainable aspects such as environmental, social and economic. Among the results are such as the pollution, such as the generation of leachate, the objection in siting a landfill site against by the public, and the negotiating and getting money contribution from local authorities. The results produced can be served

  12. Research plan for integrated ecosystem and pollutant monitoring at remote wilderness study sites

    International Nuclear Information System (INIS)

    Bruns, D.A.; Wiersma, G.B.

    1988-03-01

    This research plan outlines an approach to the measurement of pollutants and ecosystem parameters at remote, high-elevation, wilderness study sites. A multimedia, systems approach to environmental monitoring is emphasized. The primary purpose of the research is to apply and field test a technical report entitled ''Guidelines for measuring the physical, chemical, and biological condition of wilderness ecosystems.'' This document intended to provide Federal Land Managers with information to establish environmental monitoring programs in wilderness areas. To date, this monitoring document has yet to be evaluated under rigorous field conditions at a remote, high-elevation Rocky Mountain site. For the purpose of field testing approaches to monitoring of pollutants and ecosystems in remote, wilderness areas, evaluation criteria were developed. These include useability, cost-effectiveness, data variability, alternative approaches, ecosystems conceptual approach, and quality assurance. Both the Forest Service and INEL environmental monitoring techniques will be evaluated with these criteria. Another objective of this research plan is to obtain an integrated data base on pollutants and ecosystem structure and function at a remote study site. The methods tested in this project will be used to acquire these data from a systems approach. This includes multimedia monitoring of air and water quality, soils, and forest, stream, and lake ecosystems. 71 refs., 1 fig., 9 tabs

  13. Environmental impact assessment applied to planning activities

    International Nuclear Information System (INIS)

    Vismara, R.

    1994-01-01

    Object of EEC (European Economic Community) directive and italian law are certain public and private projects. However, more recent tendency are moving to an application on planning action too. There is no doubt that EIA (Environmental Impact Analysis) on project is very different than EIA on plans. Obviously EIA on a sectorial plan is not an addition of singular EIA on project. The new main objectives shall be: identification of critical areas; identification of interaction between different projects and between different factors; identification of critical project. A methodology to quantify these objectives in matricial form is presented

  14. Environmental radiation monitoring plan for depleted uranium and beryllium areas, Yuma Proving Ground

    International Nuclear Information System (INIS)

    Ebinger, M.H.; Hansen, W.R.

    1994-01-01

    This Environmental Radiation Monitoring Plan (ERM) discusses sampling soils, vegetation, and biota for depleted uranium (DU) and beryllium (Be) at Yuma Proving Ground (YPG). The existing ERM plan was used and modified to more adequately assess the potential of DU and Be migration through the YPG ecosystem. The potential pathways for DU and Be migration are discussed and include soil to vegetation, soil to animals, vegetation to animals, animals to animals, and animals to man. Sample collection will show DU deposition and will be used to estimate DU migration. The number of samples from each area varies and depends on if the firing range of interest is currently used for DU testing (GP 17A) or if the range is not used currently for DU testing (GP 20). Twenty to thirty-five individual mammals or lizards will be sampled from each transect. Air samples and samples of dust in the air fall will be collected in three locations in the active ranges. Thirty to forty-five sediment samples will be collected from different locations in the arroys near the impact areas. DU and Be sampling in the Hard Impact and Soft Impact areas changed only slightly from the existing ERM. The modifications are changes in sample locations, addition of two sediment transport locations, addition of vegetation samples, mammal samples, and air sampling from three to five positions on the impact areas. Analysis of samples for DU or total U by inductively-coupled mass spectroscopy (ICP/MS), cc spectroscopy, neutron activation analysis (NAA), and kinetic phosphorimetric analysis (KPA) are discussed, and analysis for Be by ICP/MS are recommended. Acquiring total U (no isotope data) from a large number of samples and analysis of those samples with relatively high total U concentrations results in fewer isotopic identifications but more information on U distribution. From previous studies, total U concentrations greater than about 3 times natural background are usually DU by isotopic confirmation

  15. Groundwater Monitoring Plan for the Reactor Technology Complex Operable Unit 2-13

    International Nuclear Information System (INIS)

    Richard P. Wells

    2007-01-01

    This Groundwater Monitoring Plan describes the objectives, activities, and assessments that will be performed to support the on-going groundwater monitoring requirements at the Reactor Technology Complex, formerly the Test Reactor Area (TRA). The requirements for groundwater monitoring were stipulated in the Final Record of Decision for Test Reactor Area, Operable Unit 2-13, signed in December 1997. The monitoring requirements were modified by the First Five-Year Review Report for the Test Reactor Area, Operable Unit 2-13, at the Idaho National Engineering and Environmental Laboratory to focus on those contaminants of concern that warrant continued surveillance, including chromium, tritium, strontium-90, and cobalt-60. Based upon recommendations provided in the Annual Groundwater Monitoring Status Report for 2006, the groundwater monitoring frequency was reduced to annually from twice a year

  16. Meteorological Monitoring Sampling and Analysis Plan for Environmental Monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-12-01

    This Sampling and Analysis Plan addresses meteorological monitoring activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory (ORNL). Meterological monitoring of various climatological parameters (eg., temperature, wind speed, humidity) will be collected by instruments installed at WAG 6. Data will be recorded electronically at frequencies varying from 5-min intervals to 1-h intervals, dependent upon parameter. The data will be downloaded every 2 weeks, evaluated, compressed, and uploaded into a WAG 6 data base for subsequent use. The meteorological data will be used in water balance calculations in support of the WAG 6 hydrogeological model

  17. Learning to drive: developing a workable awareness plan for monitoring new technology.

    Science.gov (United States)

    Berryman, Donna R

    2010-04-01

    Technology is constantly driving forward, and information professionals need to be informed about developments in order to work more effectively, provide new services, understand what users need and want, and to develop professionally. Learning how to monitor these developments in technology is a skill, just like learning to drive. This article provides information about developing a workable awareness plan and provides some suggested sites to monitor and tools to use.

  18. Plan for a groundwater monitoring network in Taiwan

    Science.gov (United States)

    Hsu, Shiang-Kueen

    In Taiwan, rapid economic growth, rising standards of living, and an altered societal structure have in recent years put severe demands on water supplies. Because of its stable quantity and quality, groundwater has long been a reliable source of water for domestic, agricultural, and industrial users, but the establishment of a management program that integrates groundwater and surface-water use has been hampered by the lack of groundwater data. In 1992, the Department of Water Resources (DWR) initiated a program entitled "Groundwater Monitoring Network Plan in Taiwan." Under this program, basic groundwater data, including water-level and water-quality data, are being collected, and a reliable database is being established for the purpose of managing total water resources. This paper introduces the goals, implementation stages, and scope of that plan. The plan calls for constructing 517 hydrogeologic survey stations and 990 groundwater monitoring wells within 17 years. Under this program, water-level fluctuations are continuously monitored, whereas water-quality samples are taken for analysis only at the initial drilling stage and, subsequently, at the time when a monitoring well is being serviced. In 1996, the DWR and the Water Resources Planning Commission were merged to form today's Water Resources Bureau. Résumé A Taïwan, l'expansion économique rapide, l'amélioration des conditions de vie et la transformation de la structure sociale ont provoqué, ces dernières années, une très forte demande en eau. Du fait de sa constance en qualité et en quantité, l'eau souterraine a longtemps été considérée comme une ressource en eau sûre pour les usages domestiques, agricoles et industriels. Mais la mise en place d'un programme de gestion intégrant les utilisations d'eaux souterraines et de surface a été gênée par l'absence de données sur les eaux souterraines. En 1992, le Département des Ressources en Eau a lancé le programme "Plan pour un réseau de

  19. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The RCRA & Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects & Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC`s scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule.

  20. RCRA and operational monitoring (ROM): Multi-year program plan and fiscal year 96 work plan. WBS 1.5.3, Revision 1

    International Nuclear Information System (INIS)

    1995-09-01

    The RCRA ampersand Operational Monitoring (ROM) Program Office manages the Hanford Site direct funded Resource Conservation and Recovery Act (RCRA) and Operational Monitoring under Work Breakdown Structure (WBS) 1.01.05.03. The ROM Program Office is included in Hanford Technical Services, a part of Projects ampersand Site Services of Westinghouse Hanford Company (WHC). The 1996 Multi-Year Program Plan (MYPP) includes the Fiscal Year Work Plan (FYWP). The Multi-Year Program Plan takes its direction from the Westinghouse Planning Baseline Integration Organization. The MYPP provides both the near term, enhanced details and the long term, projected details for the Program Office to use as baseline Cost, Scope and Schedule. Change Control administered during the fiscal year is against the baseline provided by near term details of this document. The MYPP process has been developed by WHC to meet its internal planning and integration needs and complies with the requirements of the US Department of Energy, Richland Operations Office (RL) Long Range Planning Process Directive (RLID 5000.2). Westinghouse Hanford Company (WHC) has developed the multi-year planning process for programs to establish the technical, schedule and cost baselines for program and support activities under WHC's scope of responsibility. The baseline information is developed by both WHC indirect funded support services organization, and direct funded programs in WHC. WHC Planning and Integration utilizes the information presented in the program specific MYPP and the Program Master Baseline Schedule (PMBS) to develop the Site-Wide Integrated Schedule

  1. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  2. Test plan for preparing the Rapid Transuranic Monitoring Laboratory for field deployment

    International Nuclear Information System (INIS)

    McIsaac, C.V.; Sill, C.W.; Gehrke, R.J.; Killian, E.W.; Watts, K.D.

    1994-04-01

    This plan describes experimental work that will be performed during fiscal year 1994 to prepare the Rapid Transuranic Monitoring Laboratory (RTML) for routine field use by US Department of Energy (DOE) Environmental Restoration and Waste Management programs. The RTML is a mobile, field-deployable laboratory developed at the Idaho National Engineering Laboratory (INEL) that provides a rapid, cost-effective means of characterizing and monitoring radioactive waste remediation sites for low-level radioactive contaminants. Analytical instruments currently installed in the RTML include an extended-range, germanium photon analysis spectrometer with an automatic sample changer; two, large-area, ionization chamber alpha spectrometers; and four alpha continuous air monitors. The RTML was field tested at the INEL during June 1993 in conjunction with the Buried Waste Integrated Demonstration's remote retrieval demonstration. The major tasks described in this test plan are to (a) evaluate the beta detectors for use in screening soil samples for 90 Sr, (b) upgrade the alpha spectral analysis software programs, and (c) upgrade the photon spectral analysis software programs

  3. 78 FR 12353 - Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2013-02-22

    ...] Winter Use Plan, Supplemental Environmental Impact Statement, Yellowstone National Park AGENCY: National... Final Supplemental Environmental Impact Statement (SEIS) for a Winter Use Plan for Yellowstone National... link to the 2012 Supplemental Winter Use Plan EIS), and at Yellowstone National Park headquarters...

  4. Lunar Impact Flash Locations from NASA's Lunar Impact Monitoring Program

    Science.gov (United States)

    Moser, D. E.; Suggs, R. M.; Kupferschmidt, L.; Feldman, J.

    2015-01-01

    Meteoroids are small, natural bodies traveling through space, fragments from comets, asteroids, and impact debris from planets. Unlike the Earth, which has an atmosphere that slows, ablates, and disintegrates most meteoroids before they reach the ground, the Moon has little-to-no atmosphere to prevent meteoroids from impacting the lunar surface. Upon impact, the meteoroid's kinetic energy is partitioned into crater excavation, seismic wave production, and the generation of a debris plume. A flash of light associated with the plume is detectable by instruments on Earth. Following the initial observation of a probable Taurid impact flash on the Moon in November 2005,1 the NASA Meteoroid Environment Office (MEO) began a routine monitoring program to observe the Moon for meteoroid impact flashes in early 2006, resulting in the observation of over 330 impacts to date. The main objective of the MEO is to characterize the meteoroid environment for application to spacecraft engineering and operations. The Lunar Impact Monitoring Program provides information about the meteoroid flux in near-Earth space in a size range-tens of grams to a few kilograms-difficult to measure with statistical significance by other means. A bright impact flash detected by the program in March 2013 brought into focus the importance of determining the impact flash location. Prior to this time, the location was estimated to the nearest half-degree by visually comparing the impact imagery to maps of the Moon. Better accuracy was not needed because meteoroid flux calculations did not require high-accuracy impact locations. But such a bright event was thought to have produced a fresh crater detectable from lunar orbit by the NASA spacecraft Lunar Reconnaissance Orbiter (LRO). The idea of linking the observation of an impact flash with its crater was an appealing one, as it would validate NASA photometric calculations and crater scaling laws developed from hypervelocity gun testing. This idea was

  5. Test plan for core sampling drill bit temperature monitor

    International Nuclear Information System (INIS)

    Francis, P.M.

    1994-01-01

    At WHC, one of the functions of the Tank Waste Remediation System division is sampling waste tanks to characterize their contents. The push-mode core sampling truck is currently used to take samples of liquid and sludge. Sampling of tanks containing hard salt cake is to be performed with the rotary-mode core sampling system, consisting of the core sample truck, mobile exhauster unit, and ancillary subsystems. When drilling through the salt cake material, friction and heat can be generated in the drill bit. Based upon tank safety reviews, it has been determined that the drill bit temperature must not exceed 180 C, due to the potential reactivity of tank contents at this temperature. Consequently, a drill bit temperature limit of 150 C was established for operation of the core sample truck to have an adequate margin of safety. Unpredictable factors, such as localized heating, cause this buffer to be so great. The most desirable safeguard against exceeding this threshold is bit temperature monitoring . This document describes the recommended plan for testing the prototype of a drill bit temperature monitor developed for core sampling by Sandia National Labs. The device will be tested at their facilities. This test plan documents the tests that Westinghouse Hanford Company considers necessary for effective testing of the system

  6. 76 FR 16795 - The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for...

    Science.gov (United States)

    2011-03-25

    ...] The National Antimicrobial Resistance Monitoring System Strategic Plan 2011-2015; Request for Comments..., FDA requested comments on a document for the National Antimicrobial Resistance Monitoring System....fda.gov/AnimalVeterinary/SafetyHealth/AntimicrobialResistance/NationalAntimicrobialResistance...

  7. Fiscal Year 2005 Integrated Monitoring Plan for the Hanford Groundwater Performance Assessment Project

    International Nuclear Information System (INIS)

    Rieger, JoAnne T.; Hartman, Mary J.

    2005-01-01

    Groundwater is monitored in hundreds of wells at the Hanford Site to fulfill a variety of requirements. Separate monitoring plans are prepared for various purposes, but sampling is coordinated and data are shared among users. DOE manages these activities through the Hanford Groundwater Performance Assessment Project, which is the responsibility of Pacific Northwest National Laboratory. The groundwater project integrates monitoring for various objectives into a single sampling schedule to avoid redundancy of effort and to improve efficiency of sample collection.This report documents the purposes and objectives of groundwater monitoring at the DOE Hanford Site in southeastern Washington State

  8. Liquid Effluent Monitoring Information System test plans release 1.2

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  9. Tank monitor and control system (TMACS) software configuration management plan

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  10. Incorporating genetic sampling in long-term monitoring and adaptive management in the San Diego County Management Strategic Plan Area, Southern California

    Science.gov (United States)

    Vandergast, Amy G.

    2017-06-02

    Habitat and species conservation plans usually rely on monitoring to assess progress towards conservation goals. Southern California, USA, is a hotspot of biodiversity and home to many federally endangered and threatened species. Here, several regional multi-species conservation plans have been implemented to balance development and conservation goals, including in San Diego County. In the San Diego County Management Strategic Plan Area (MSPA), a monitoring framework for the preserve system has been developed with a focus on species monitoring, vegetation monitoring, threats monitoring and abiotic monitoring. Genetic sampling over time (genetic monitoring) has proven useful in gathering species presence and abundance data and detecting population trends, particularly related to species and threats monitoring objectives. This report reviews genetic concepts and techniques of genetics that relate to monitoring goals and outlines components of a genetic monitoring scheme that could be applied in San Diego or in other monitoring frameworks throughout the Nation.

  11. Impact of Base Station Cooperation on Cell Planning

    Directory of Open Access Journals (Sweden)

    Ian Dexter Garcia

    2010-01-01

    Full Text Available Base station cooperation (BSC has been identified as a key radio access technology for next-generation cellular networks such as LTE-Advanced. BSC impacts cell planning, which is the methodical selection of base station (BS sites, and BS equipment configuration for cost-effective cellular networks. In this paper, the impact of BSC on cell plan parameters (coverage, traffic, handover, and cost, as well as additional cell planning steps required for BSC are discussed. Results show that BSC maximizes its gains over noncooperation (NC in a network wherein interference from cooperating BSs is the main limitation. Locations exist where NC may produce higher throughputs, therefore dynamic or semistatic switching between BSC and NC, called fractional BSC, is recommended. Because of interference from noncooperating BSs, the gains of BSC over NC are upper bounded, and diminishes at greater intersite distances because of noise. This encourages smaller cell sizes, higher transmit powers, and dynamic clustering of cooperative BSs.

  12. Monitoring plan for routine organic air emissions at the Radioactive Waste Management Complex Waste Storage Facilities

    International Nuclear Information System (INIS)

    Galloway, K.J.; Jolley, J.G.

    1994-06-01

    This monitoring plan provides the information necessary to perform routine organic air emissions monitoring at the Waste Storage Facilities located at the Transuranic Storage Area of the Radioactive Waste Management Complex at the Idaho National Engineering Laboratory. The Waste Storage Facilities include both the Type I and II Waste Storage Modules. The plan implements a dual method approach where two dissimilar analytical methodologies, Open-Path Fourier Transform Infrared Spectroscopy (OP-FTIR) and ancillary SUMMA reg-sign canister sampling, following the US Environmental Protection Agency (EPA) analytical method TO-14, will be used to provide qualitative and quantitative volatile organic concentration data. The Open-Path Fourier Transform Infrared Spectroscopy will provide in situ, real time monitoring of volatile organic compound concentrations in the ambient air of the Waste Storage Facilities. To supplement the OP-FTIR data, air samples will be collected using SUMMA reg-sign, passivated, stainless steel canisters, following the EPA Method TO-14. These samples will be analyzed for volatile organic compounds with gas chromatograph/mass spectrometry analysis. The sampling strategy, procedures, and schedules are included in this monitoring plan. The development of this monitoring plan is driven by regulatory compliance to the Resource Conservation and Recovery Act, State of Idaho Toxic Air Pollutant increments, Occupational Safety and Health Administration. The various state and federal regulations address the characterization of the volatile organic compounds and the resultant ambient air emissions that may originate from facilities involved in industrial production and/or waste management activities

  13. 78 FR 10606 - Final Management Plan and Environmental Assessment for Monitor National Marine Sanctuary: Notice...

    Science.gov (United States)

    2013-02-14

    ... Environmental Assessment for Monitor National Marine Sanctuary: Notice of Public Availability AGENCY: Office of National Marine Sanctuaries (ONMS), National Ocean Service (NOS), National Oceanic and Atmospheric... releasing the final management plan and environmental assessment for Monitor National Marine Sanctuary. DATE...

  14. 40 CFR 265 interim status indicator-evaluation ground-water monitoring plan for the 216-B-63 trench

    International Nuclear Information System (INIS)

    Bjornstad, B.N.; Dudziak, S.

    1989-03-01

    This document outlines a ground-water monitoring plan for the 216-B-63 trench located in the northeast corner of the 200-East Area on the Hanford Site in southeastern Washington State. It has been determined that hazardous materials (corrosives) were disposed of to the trench during past operations. Installation of an interim-status ground-water monitoring system is required to determine whether hazardous chemicals are leaching to the ground water from beneath the trench. This document summarizes the existing data that are available from near the 216-B-63 trench and presents a plan to determine the extent of ground-water contamination, if any, derived from the trench. The plan calls for the installation of four new monitoring wells located near the west end of the trench. These wells will be used to monitor ground-water levels and water quality immediately adjacent to the trench. Two existing RCRA monitoring wells, which are located near the trench and hydraulically upgradient of it, will be used as background wells. 46 refs., 15 figs., 12 tabs

  15. Sampling and analysis plan for groundwater and surface water monitoring at the Y-12 Plant during calendar year 1995

    International Nuclear Information System (INIS)

    1994-10-01

    This plan provides a description of the groundwater and surface-water quality monitoring activities planned for calendar year (CY) 1995 at the Department of Energy Y-12 Plant. Included in this plan are the monitoring activities managed by the Y-12 Plant Health, Safety, Environment, and Accountability (HSEA) Organization through the Y-12 Plant Groundwater Protection Program (GWPP). Other groundwater and surface water monitoring activities (e.g. selected Environmental Restoration Program activities, National Pollution Discharge Elimination System (NPDES) monitoring) not managed through the Y-12 Plant GWPP are not addressed in this report. Several monitoring programs will be implemented in three hydrogeologic regimes: the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek and East Fork regimes are located within Bear Creek Valley, and the Chestnut Ridge Regime is located south of the Y-12 Plant. For various reasons, modifications to the 1995 monitoring programs may be necessary during implementation. For example, changes in regulatory requirements may alter the parameters specified for selected wells, or wells could be added to or deleted from the monitoring network. All modifications to the monitoring programs will be approved by the Y-12 Plant GWPP manager and documented as addenda to this sampling and analysis plan

  16. MANAGEMENT PLANS AND THEIR IMPACT ON SCHOOL IMPROVEMENT

    Directory of Open Access Journals (Sweden)

    Ignacio Polo Martínez

    2016-06-01

    Full Text Available OECD (2015 states that management's leadership is a critical factor for implementing reforms and improving schools. Candidates are required to submit a management plan outlining the framework of a plan to be followed during their 4 year term. Despite the plan outlined in the proposal, the implicit "non aggression pact" between the participants (the teachers and the directors, who are teachers themselves, makes change difficult. As a result, management plans have little impact on improving methods of teaching and academic results achieved by the students. In this article we have tried to achieve three objectives: 1 analyze the relationship between the renewal, selection and appointment of a director with the management plan around our country, 2 analyze which aspects are those that, according to major international studies, should determine the content, development and evaluation of a management plan, and 3 to suggest how one could implement a management plan for an education center or school.

  17. Study on environmental impact assessment of uranium mining and milling base planning

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    Environmental impact assessment (EIA) of project planning is part of strategic EIA, which provides full consideration and evaluation of the potential environmental impact on tiered basis in the process of plan implementation. With account being taken of EIA of uranium mining/milling base and the current situation of mining/milling industry, this paper determined environmental protection objectives of EIA, screened assessment indexes and identified weighting factors. Based on the characteristics of mines planned, restrictive score values are estimated each for EIA weighting factor. Finally some suggestions were made for adjusting the plan. (authors)

  18. Best management practices plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-02-01

    This Best Management Practices (BMP) Plan has been developed as part of the environmental monitoring program at Waste Area Grouping (WAG) 6. The BMP Plan describes the requirements for personnel training, spill prevention and control, environmental compliance, and sediment/erosion control as they relate to environmental monitoring activities and installation of Monitoring Station 4 at WAG 6

  19. NOAA's Role in Sustaining Global Ocean Observations: Future Plans for OAR's Ocean Observing and Monitoring Division

    Science.gov (United States)

    Todd, James; Legler, David; Piotrowicz, Stephen; Raymond, Megan; Smith, Emily; Tedesco, Kathy; Thurston, Sidney

    2017-04-01

    The Ocean Observing and Monitoring Division (OOMD, formerly the Climate Observation Division) of the National Oceanic and Atmospheric Administration (NOAA) Climate Program Office provides long-term, high-quality global observations, climate information and products for researchers, forecasters, assessments and other users of environmental information. In this context, OOMD-supported activities serve a foundational role in an enterprise that aims to advance 1) scientific understanding, 2) monitoring and prediction of climate and 3) understanding of potential impacts to enable a climate resilient society. Leveraging approximately 50% of the Global Ocean Observing System, OOMD employs an internationally-coordinated, multi-institution global strategy that brings together data from multiple platforms including surface drifting buoys, Argo profiling floats, flux/transport moorings (RAMA, PIRATA, OceanSITES), GLOSS tide gauges, SOOP-XBT and SOOP-CO2, ocean gliders and repeat hydrographic sections (GO-SHIP). OOMD also engages in outreach, education and capacity development activities to deliver training on the social-economic applications of ocean data. This presentation will highlight recent activities and plans for 2017 and beyond.

  20. Dosimetric impact of mixed-energy volumetric modulated arc therapy plans for high-risk prostate cancer

    Directory of Open Access Journals (Sweden)

    Shyam Pokharel

    2013-10-01

    Full Text Available Purpose: This study investigated the dosimetric impact of mixing low and high energy treatment plans for prostate cancer treated with volumetric modulated arc therapy (VMAT technique in the form of RapidArc.Methods: A cohort of 12 prostate cases involving proximal seminal vesicles and lymph nodes was selected for this retrospective study. For each prostate case, the single-energy plans (SEPs and mixed-energy plans (MEPs were generated.  First, the SEPs were created using 6 mega-voltage (MV energy for both the primary and boost plans. Second, the MEPs were created using 16 MV energy for the primary plan and 6 MV energy for the boost plan. The primary and boost MEPs used identical beam parameters and same dose optimization values as in the primary and boost SEPs for the corresponding case. The dosimetric parameters from the composite plans (SEPs and MEPs were evaluated. Results: The dose to the target volume was slightly higher (on average <1% in the SEPs than in the MEPs. The conformity index (CI and homogeneity index (HI values between the SEPs and MEPs were comparable. The dose to rectum and bladder was always higher in the SEPs (average difference up to 3.7% for the rectum and up to 8.4% for the bladder than in the MEPs. The mean dose to femoral heads was higher by about 0.8% (on average in the MEPs than in the SEPs. The number of monitor units and integral dose were higher in the SEPs compared to the MEPs by average differences of 9.1% and 5.5%, respectively.Conclusion: The preliminary results from this study suggest that use of mixed-energy VMAT plan for high-risk prostate cancer could potentially reduce the integral dose and minimize the dose to rectum and bladder, but for the higher femoral head dose.-----------------------------------------------Cite this article as:Pokharel S. Dosimetric impact of mixed-energy volumetric modulated arc therapy plans for high-risk prostate cancer. Int J Cancer Ther Oncol 2013;1(1:01011.DOI: http

  1. Changes in water quality along the course of a river - Classic monitoring versus patrol monitoring

    Science.gov (United States)

    Absalon, Damian; Kryszczuk, Paweł; Rutkiewicz, Paweł

    2017-11-01

    Monitoring of water quality is a tool necessary to assess the condition of waterbodies in order to properly formulate water management plans. The paper presents the results of patrol monitoring of a 40-kilometre stretch of the Oder between Racibórz and Koźle. It has been established that patrol monitoring is a good tool for verifying the distribution of points of classic stationary monitoring, particularly in areas subject to varied human impact, where tributaries of the main river are very diversified as regards hydrochemistry. For this reason the results of operational monitoring carried out once every few years may not be reliable and the presented condition of the monitored waterbodies may be far from reality.

  2. 78 FR 42970 - Notice of Intent To Prepare a Resource Management Plan for the Bering Sea-Western Interior...

    Science.gov (United States)

    2013-07-18

    ... integrated into the entire planning process, from preparing the pre-plan to implementation and monitoring; 17... allocations for these lands. Considering wilderness characteristics in the land use planning process may... impacts on Indian trust assets and potential impacts to cultural resources, will be given due...

  3. An Expert System Applied in Construction Water Quality Monitoring

    OpenAIRE

    Leila Ooshaksaraie; Noor E.A. Basri

    2011-01-01

    Problem statement: An untoward environmental impact of urban growth in Malaysia has been deterioration in a number of watercourses due to severe siltation and other pollutants from the construction site. Water quality monitoring is a plan for decision makers to take into account the adverse impacts of construction activities on the receiving water bodies. It is also a process for collecting the construction water quality monitoring, baseline data and standard level. Approa...

  4. Using scenario planning to evaluate the impacts of climate change on wildlife populations and communities in the Florida Everglades

    Science.gov (United States)

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-01-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  5. Using Scenario Planning to Evaluate the Impacts of Climate Change on Wildlife Populations and Communities in the Florida Everglades

    Science.gov (United States)

    Catano, Christopher P.; Romañach, Stephanie S.; Beerens, James M.; Pearlstine, Leonard G.; Brandt, Laura A.; Hart, Kristen M.; Mazzotti, Frank J.; Trexler, Joel C.

    2015-04-01

    It is uncertain how climate change will impact hydrologic drivers of wildlife population dynamics in freshwater wetlands of the Florida Everglades, or how to accommodate this uncertainty in restoration decisions. Using projections of climate scenarios for the year 2060, we evaluated how several possible futures could affect wildlife populations (wading birds, fish, alligators, native apple snails, amphibians, threatened and invasive species) across the Everglades landscape and inform planning already underway. We used data collected from prior research and monitoring to parameterize our wildlife population models. Hydrologic data were simulated using a spatially explicit, regional-scale model. Our scenario evaluations show that expected changes in temperature, precipitation, and sea level could significantly alter important ecological functions. All of our wildlife indicators were negatively affected by scenarios with less rainfall and more evapotranspiration. Under such scenarios, habitat suitability was substantially reduced for iconic animals such as wading birds and alligators. Conversely, the increased rainfall scenario benefited aquatic prey productivity and apex predators. Cascading impacts on non-native species is speculative, but increasing temperatures could increase the time between cold events that currently limit expansion and abundance of non-native fishes, amphibians, and reptiles with natural ranges in the tropics. This scenario planning framework underscored the benefits of proceeding with Everglades restoration plans that capture and clean more freshwater with the potential to mitigate rainfall loss and postpone impacts of sea level rise.

  6. Application for verification of monitor units of the treatment planning system

    International Nuclear Information System (INIS)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-01-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (TPS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  7. Business plan: Supplemental draft environmental impact statement. Volume 2. Appendices

    International Nuclear Information System (INIS)

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS

  8. Business Plan : Supplemental Draft Environmental Impact Statement, Volume 2, Appendices.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1995-02-01

    This document contains the appendices for the Bonneville Power Administration (BPA) Business Plan: Supplemental Draft Environmental Impact Statement. Included are: BPA products and services; Rate design; Methodology and assumptions for numerical analysis; Retail utility operations; Comments and responses to the draft business plan EIS.

  9. Monitoring plan for characterization of the Building 3019 leak site

    International Nuclear Information System (INIS)

    1986-06-01

    The Oak Ridge National Laboratory (ORNL) has established a Remedial Action Program to provide comprehensive management of areas where past research, development, and waste management activities have resulted in residual contamination of facilities or the environment. In the winter of 1985, elevated levels of strontium-90 were detected in White Oak Creek and the ORNL sewage treatment plant. A leak was subsequently identified in a low-level waste transfer line north of Building 3019. The period of leakage and the exact chemical composition of the effluent are unknown. Two dye tests conducted at the leak site have identified several possible pathways for contaminant migration. The discovery of a solution cavity in the Chickamauga bedrock underlying the leak site and the rapid appearance of dye in the sump at Building 3042 indicate the extension of the cavity system along strike to the east. This report outlines the available published and unpublished background information pertaining to the site and proposes a monitoring plan consisting of soil sample collection and monitor well installation to provide a preliminary assessment of the types and extent of contamination at the leak site. The plan is also designed to provide additional geologic and hydrologic data for evaluating possible contaminant migration pathways. 6 refs., 10 figs., 1 tab

  10. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.0

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  11. Liquid Effluent Monitoring Information System (LEMIS) test plans release 1.1

    International Nuclear Information System (INIS)

    Adams, R.T.

    1994-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  12. Connected vehicle impacts on transportation planning : technical memorandum #5 : case studies.

    Science.gov (United States)

    2015-12-01

    The principal objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should be considered across the range of transportation planning processes and products developed...

  13. Tank monitor and control system (TMACS) software configuration management plan; TOPICAL

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  14. Domestic water service delivery indicators and frameworks for monitoring, evaluation, policy and planning: a review.

    Science.gov (United States)

    Kayser, Georgia L; Moriarty, Patrick; Fonseca, Catarina; Bartram, Jamie

    2013-10-11

    Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator--service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.

  15. Domestic Water Service Delivery Indicators and Frameworks for Monitoring, Evaluation, Policy and Planning: A Review

    Directory of Open Access Journals (Sweden)

    Jamie Bartram

    2013-10-01

    Full Text Available Monitoring of water services informs policy and planning for national governments and the international community. Currently, the international monitoring system measures the type of drinking water source that households use. There have been calls for improved monitoring systems over several decades, some advocating use of multiple indicators. We review the literature on water service indicators and frameworks with a view to informing debate on their relevance to national and international monitoring. We describe the evidence concerning the relevance of each identified indicator to public health, economic development and human rights. We analyze the benefits and challenges of using these indicators separately and combined in an index as tools for planning, monitoring, and evaluating water services. We find substantial evidence on the importance of each commonly recommended indicator—service type, safety, quantity, accessibility, reliability or continuity of service, equity, and affordability. Several frameworks have been proposed that give structure to the relationships among individual indicators and some combine multiple indicator scores into a single index but few have been rigorously tested. More research is needed to understand if employing a composite metric of indicators is advantageous and how each indicator might be scored and scaled.

  16. Burlington Bottoms Wildlife Mitigation Project. Final Environmental Assessment/Management Plan and Finding of No Significant Impact.

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property.

  17. Burlington Bottoms Wildlife Mitigation Project. Final environmental assessment/management plan and finding of no significant impact

    International Nuclear Information System (INIS)

    1994-12-01

    Bonneville Power Administration (BPA) proposes to fund wildlife management and enhancement activities for the Burlington bottoms wetlands mitigation site. Acquired by BPA in 1991, wildlife habitat at Burlington bottoms would contribute toward the goal of mitigation for wildlife losses and inundation of wildlife habitat due to the construction of Federal dams in the lower Columbia and Willamette River Basins. Target wildlife species identified for mitigation purposes are yellow warbler, great blue heron, black-capped chickadee, red-tailed hawk, valley quail, spotted sandpiper, wood duck, and beaver. The Draft Management Plan/Environmental Assessment (EA) describes alternatives for managing the Burlington Bottoms area, and evaluates the potential environmental impacts of the alternatives. Included in the Draft Management Plan/EA is an implementation schedule, and a monitoring and evaluation program, both of which are subject to further review pending determination of final ownership of the Burlington Bottoms property

  18. 76 FR 22917 - Dog Management Plan/Draft Environmental Impact Statement, Golden Gate National Recreation Area...

    Science.gov (United States)

    2011-04-25

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-PWR-PWRO--0315-696; 8145-8B90-SZM] Dog... Impact Statement/Dog Management Plan, Golden Gate National Recreation Area. SUMMARY: The National Park Service has prepared a Draft Dog Management Plan and Environmental Impact Statement (Plan/DEIS). The Plan...

  19. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Rationale.

    Science.gov (United States)

    Cort, H. Russell

    The rationale for the Planning, Monitoring, and Implementation Model (PMI) is the subject of this paper. The Superintendent of the District of Columbia Public Schools requested a model for systematic evaluation of educational programs to determine their effectiveness. The school system's emphasis on objective-referenced instruction and testing,…

  20. Impact of environmental justice analysis on transportation planning.

    Science.gov (United States)

    2011-12-30

    This report presents the findings of a study sponsored by the Georgia Department of Transportation (GDOT): Impact of Environmental Justice (EJ) on Transportation Planning. The objectives of the study were to determine the state of the practice of EJ ...

  1. Puget Sound area electric reliability plan. Draft environmental impact statement

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power & Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound`s power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  2. Puget Sound Area Electric Reliability Plan : Draft Environmental Impact State.

    Energy Technology Data Exchange (ETDEWEB)

    United States. Bonneville Power Administration.

    1991-09-01

    The Puget Sound Area Electric Reliability Plan Draft Environmental Impact Statement (DEIS) identifies the alternatives for solving a power system problem in the Puget Sound area. This Plan is undertaken by Bonneville Power Administration (BPA), Puget Sound Power Light, Seattle City Light, Snohomish Public Utility District No. 1 (PUD), and Tacoma Public Utilities. The Plan consists of potential actions in Puget Sound and other areas in the State of Washington. A specific need exists in the Puget Sound area for balance between east-west transmission capacity and the increasing demand to import power generated east of the Cascades. At certain times of the year, there is more demand for power than the electric system can supply in the Puget Sound area. This high demand, called peak demand, occurs during the winter months when unusually cold weather increases electricity use for heating. The existing power system can supply enough power if no emergencies occur. However, during emergencies, the system will not operate properly. As demand grows, the system becomes more strained. To meet demand, the rate of growth of demand must be reduced or the ability to serve the demand must be increased, or both. The plan to balance Puget Sound's power demand and supply has these purposes: The plan should define a set of actions that would accommodate ten years of load growth (1994--2003). Federal and State environmental quality requirements should be met. The plan should be consistent with the plans of the Northwest Power Planning Council. The plan should serve as a consensus guideline for coordinated utility action. The plan should be flexible to accommodate uncertainties and differing utility needs. The plan should balance environmental impacts and economic costs. The plan should provide electric system reliability consistent with customer expectations. 29 figs., 24 tabs.

  3. Independent verification of monitor unit calculation for radiation treatment planning system.

    Science.gov (United States)

    Chen, Li; Chen, Li-Xin; Huang, Shao-Min; Sun, Wen-Zhao; Sun, Hong-Qiang; Deng, Xiao-Wu

    2010-02-01

    To ensure the accuracy of dose calculation for radiation treatment plans is an important part of quality assurance (QA) procedures for radiotherapy. This study evaluated the Monitor Units (MU) calculation accuracy of a third-party QA software and a 3-dimensional treatment planning system (3D TPS), to investigate the feasibility and reliability of independent verification for radiation treatment planning. Test plans in a homogenous phantom were designed with 3-D TPS, according to the International Atomic Energy Agency (IAEA) Technical Report No. 430, including open, blocked, wedge, and multileaf collimator (MLC) fields. Test plans were delivered and measured in the phantom. The delivered doses were input to the QA software and the independent calculated MUs were compared with delivery. All test plans were verified with independent calculation and phantom measurements separately, and the differences of the two kinds of verification were then compared. The deviation of the independent calculation to the measurements was (0.1 +/- 0.9)%, the biggest difference fell onto the plans that used block and wedge fields (2.0%). The mean MU difference between the TPS and the QA software was (0.6 +/- 1.0)%, ranging from -0.8% to 2.8%. The deviation in dose of the TPS calculation compared to the measurements was (-0.2 +/- 1.7)%, ranging from -3.9% to 2.9%. MU accuracy of the third-party QA software is clinically acceptable. Similar results were achieved with the independent calculations and the phantom measurements for all test plans. The tested independent calculation software can be used as an efficient tool for TPS plan verification.

  4. Effectiveness monitoring for the aquatic and riparian component of the Northwest Forest Plan: conceptual framework and options.

    Science.gov (United States)

    Gordon H. Reeves; David B. Hohler; David P. Larsen; David E. Busch; Kim Kratz; Keith Reynolds; Karl F. Stein; Thomas Atzet; Polly Hays; Michael. Tehan

    2004-01-01

    An Aquatic and Riparian Effectiveness Monitoring Plan (AREMP) for the Northwest Forest Plan is intended to characterize the ecological condition of watersheds and aquatic ecosystems. So to determine the effectiveness of the Northwest Forest Plan to meet relevant objectives, this report presents the conceptual foundation of options for use in pilot testing and...

  5. Health impact assessment in planning: Development of the design for health HIA tools

    International Nuclear Information System (INIS)

    Forsyth, Ann; Slotterback, Carissa Schively; Krizek, Kevin J.

    2010-01-01

    How can planners more systematically incorporate health concerns into practical planning processes? This paper describes a suite of health impact assessment tools (HIAs) developed specifically for planning practice. Taking an evidence-based approach the tools are designed to fit into existing planning activities. The tools include: a short audit tool, the Preliminary Checklist; a structured participatory workshop, the Rapid HIA; an intermediate health impact assessment, the Threshold Analysis; and a set of Plan Review Checklists. This description provides a basis for future work including assessing tool validity, refining specific tools, and creating alternatives.

  6. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    S. E. Rawlinson

    2001-09-01

    Bechtel Nevada (BN) manages two low-level Radioactive Waste Management Sites (RWMSs) (one site is in Area 3 and the other is in Area 5) at the Nevada Test Site (NTS) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Operations Office (NNSA/NV). The current DOE Order governing management of radioactive waste is 435.1. Associated with DOE Order 435.1 is a Manual (DOE M 435.1-1) and Guidance (DOE G 435.1-1). The Manual and Guidance specify that preliminary closure and monitoring plans for a low-level waste (LLW) management facility be developed and initially submitted with the Performance Assessment (PA) and Composite Analysis (CA) for that facility. The Manual and Guidance, and the Disposal Authorization Statement (DAS) issued for the Area 3 RWMS further specify that the preliminary closure and monitoring plans be updated within one year following issuance of a DAS. This Integrated Closure and Monitoring Plan (ICMP) fulfills both requirements. Additional updates will be conducted every third year hereafter. This document is an integrated plan for closing and monitoring both RWMSs, and is based on guidance issued in 1999 by the DOE for developing closure plans. The plan does not follow the format suggested by the DOE guidance in order to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. The closure and monitoring plans were integrated because much of the information that would be included in individual plans is the same, and integration provides efficient presentation and program management. The ICMP identifies the regulatory requirements, describes the disposal sites and the physical environment where they are located, and defines the approach and schedule for both closing and monitoring the sites.

  7. Groundwater Monitoring Plan for the 216-S-10 Pond and Ditch, Interim Change Notice 1

    International Nuclear Information System (INIS)

    Williams, Bruce A.

    2003-01-01

    During 2003, the upgradient well 299-W26-7 went dry and one new groundwater monitoring well was installed downgradient (well 299-W26-14) of the 216-S-10 pond and ditch. This ICN updates the groundwater monitoring wells for the 216-S-10 pond and ditch and adds a revised well location map to the plan

  8. Engineering Task Plan for Fourth Generation Hanford Corrosion Monitoring System

    International Nuclear Information System (INIS)

    NORMAN, E.C.

    2000-01-01

    This Engineering Task Plan (ETP) describes the activities associated with the installation of cabinets containing corrosion monitoring equipment on tanks 241-AN-102 and 241-AN-107. The new cabinets (one per tank) will be installed adjacent to existing corrosion probes already installed in riser WST-RISER-016 on both tanks. The corrosion monitoring equipment to be installed utilizes the technique of electrochemical noise (EN) for monitoring waste tank corrosion. Typically, EN consists of low frequency (4 Hz) and small amplitude signals that are spontaneously generated by electrochemical reactions occurring at corroding or other surfaces. EN analysis is well suited for monitoring and identifying the onset of localized corrosion, and for measuring uniform corrosion rates. A typical EN based corrosion-monitoring system measures instantaneous fluctuations in corrosion current and potential between three nominally identical electrodes of the material of interest immersed in the environment of interest. Time-dependent fluctuations in corrosion current are described by electrochemical current noise, and time-dependent fluctuations of corrosion potential are described by electrochemical noise. The corrosion monitoring systems are designed to detect the onset of localized corrosion phenomena if tank conditions should change to allow these phenomena to occur. In addition to the EN technique, the systems also facilitate the use of the Linear Polarization Resistance (LPR) technique to collect uniform corrosion rate information. LPR measures the linearity at the origin of the polarization curve for overvoltages up to a few millivolts away from the rest potential or natural corrosion potential. The slope of the current vs. voltage plot gives information on uniform corrosion rates

  9. Near Earth space plasma monitoring under COST 296

    Czech Academy of Sciences Publication Activity Database

    Altadill, D.; Boška, Josef; Cander, Lj. R.; Gulyaeva, T.; Reinisch, B. W.; Romano, V.; Krankowski, A.; Bremer, J.; Belehaki, A.; Stanislawska, I.; Jakowski, N.; Scotto, C.

    2009-01-01

    Roč. 52, 3/4 (2009), s. 221-234 ISSN 1593-5213 R&D Projects: GA MŠk OC 091 Institutional research plan: CEZ:AV0Z30420517 Keywords : Ionosphere * monitoring * data validation * monitoring techniques * campaigns * dissemination Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics Impact factor: 0.548, year: 2009 http://www.annalsofgeophysics.eu/index.php/annals/article/view/4562

  10. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  11. Social Impact Management Plans : Innovation in corporate and public policy

    NARCIS (Netherlands)

    Franks, Daniel M.; Vanclay, Frank

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and

  12. Social Impact Management Plans : Innovation in corporate and public policy

    NARCIS (Netherlands)

    Franks, Daniel M.; Vanclay, Frank

    2013-01-01

    Social Impact Assessment (SIA) has traditionally been practiced as a predictive study for the regulatory approval of major projects, however, in recent years the drivers and domain of focus for SIA have shifted. This paper details the emergence of Social Impact Management Plans (SIMPs) and

  13. Environmental impacts of power plants and transmission lines in power system planning

    International Nuclear Information System (INIS)

    Miracapillo, C.; Moreschini, G.; Rome Univ. 'La Sapienza'

    1992-01-01

    This paper deals with a criterion to assess the environmental impacts of power plants and transmission lines in power system planning. First, the effects of hydro-plants, thermal plants and transmission lines are reviewed. Then, a number of methods for the evaluation of the environmental impacts of civil and industrial plants are described. A new criterion is proposed to introduce the evaluation of the environmental impact and related costs into methods for power system planning. Finally, the criterion is applied to a simple case

  14. How countries link REDD+ interventions to drivers in their readiness plans: implications for monitoring systems

    International Nuclear Information System (INIS)

    Salvini, G; Herold, M; De Sy, V; Kissinger, G; Brockhaus, M; Skutsch, M

    2014-01-01

    Countries participating in the REDD+ scheme are in the readiness phase, designing policy interventions to address drivers of deforestation and forest degradation (DD). In order for REDD+ interventions to be effective, it is essential that they take into account the specific drivers that they aim to address. Moreover it is crucial to design systems that monitor the effectiveness of the planned interventions. In this article we provide a comprehensive and comparative assessment of interventions proposed by 43 REDD+ countries in 98 readiness documents. We summarize the types of interventions and assess if they are formulated referring to the drivers of DD that they are aiming to address. Based on this assessment we consider the implications for systems for monitoring effectiveness of proposed interventions. Most countries reviewed link proposed interventions to specific drivers of DD. The majority of the countries making this link have better driver data quality, in particularly those that present their data in ratio or ordinal terms. Proposed interventions focus not only on activities to reduce deforestation, but also on other forest related REDD+ activities such as sustainable forest management, which reduce forest degradation and enhance forest stocks. Moreover, driver-specific interventions often relate to drivers not only inside but also outside the forest sector. Hence we suggest that monitoring systems need to assess not only deforestation rates through remote sensing, but also degradation and other carbon stock changes within the forest, using more detailed ground level surveys and measurements. In addition, the performance of interventions outside the forest need to be monitored, even if the impacts of these cannot be linked to specific changes in forest carbon stock in specific locations. (paper)

  15. Study on environmental impact assessment index system of uranium production base construction plan

    International Nuclear Information System (INIS)

    Liu Xiaochao; Song Liquan

    2008-01-01

    The index system on planning environmental impact assessment of uranium mining base construction is discussed by using the hiberarchy method according to characteristics of uranium production and environmental protection object of planning assessment. The suggested index system is in favor of persistent exploitation of uranium resource and environmental protection in the uranium mining area, and can provide a reference for planning environmental impact assessment of uranium mining base construction in China. (authors)

  16. On a digital wireless impact-monitoring network for large-scale composite structures

    International Nuclear Information System (INIS)

    Yuan, Shenfang; Mei, Hanfei; Qiu, Lei; Ren, Yuanqiang

    2014-01-01

    Impact, which may occur during manufacture, service or maintenance, is one of the major concerns to be monitored throughout the lifetime of aircraft composite structures. Aiming at monitoring impacts online while minimizing the weight added to the aircraft to meet the strict limitations of aerospace engineering, this paper puts forward a new digital wireless network based on miniaturized wireless digital impact-monitoring nodes developed for large-scale composite structures. In addition to investigations on the design methods of the network architecture, time synchronization and implementation method, a conflict resolution method based on the feature parameters of digital sequences is first presented to address impact localization conflicts when several nodes are arranged close together. To verify the feasibility and stability of the wireless network, experiments are performed on a complex aircraft composite wing box and an unmanned aerial vehicle (UAV) composite wing. Experimental results show the successful design of the presented network. (paper)

  17. 77 FR 33237 - Saline Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National...

    Science.gov (United States)

    2012-06-05

    ... Valley Warm Springs Management Plan/Environmental Impact Statement, Death Valley National Park, Inyo... an Environmental Impact Statement for the Saline Valley Warm Springs Management Plan, Death Valley... analysis process for the Saline Valley Warm Springs Management Plan for Death Valley [[Page 33238...

  18. 76 FR 68503 - Winter Use Plan, Final Environmental Impact Statement, Yellowstone National Park, Idaho, Montana...

    Science.gov (United States)

    2011-11-04

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact.... ACTION: Notice of availability of the Final Environmental Impact Statement for the Winter Use Plan... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and [[Page 68504

  19. Zoonoses action plan Salmonella monitoring programme: an investigation of the sampling protocol.

    Science.gov (United States)

    Snary, E L; Munday, D K; Arnold, M E; Cook, A J C

    2010-03-01

    The Zoonoses Action Plan (ZAP) Salmonella Programme was established by the British Pig Executive to monitor Salmonella prevalence in quality-assured British pigs at slaughter by testing a sample of pigs with a meat juice enzyme-linked immunosorbent assay for antibodies against group B and C(1) Salmonella. Farms were assigned a ZAP level (1 to 3) depending on the monitored prevalence, and ZAP 2 or 3 farms were required to act to reduce the prevalence. The ultimate goal was to reduce the risk of human salmonellosis attributable to British pork. A mathematical model has been developed to describe the ZAP sampling protocol. Results show that the probability of assigning a farm the correct ZAP level was high, except for farms that had a seroprevalence close to the cutoff points between different ZAP levels. Sensitivity analyses identified that the probability of assigning a farm to the correct ZAP level was dependent on the sensitivity and specificity of the test, the number of batches taken to slaughter each quarter, and the number of samples taken per batch. The variability of the predicted seroprevalence was reduced as the number of batches or samples increased and, away from the cutoff points, the probability of being assigned the correct ZAP level increased as the number of batches or samples increased. In summary, the model described here provided invaluable insight into the ZAP sampling protocol. Further work is required to understand the impact of the program for Salmonella infection in British pig farms and therefore on human health.

  20. Environmental impact assessment report

    Energy Technology Data Exchange (ETDEWEB)

    Jung, K. J.; Paik, S. T.; Chung, U. S.; Jung, K. H.; Park, S. K.; Lee, D. G.; Kim, H. R.; Kim, J. K.; Yang, S. H.; Lee, B. J.; Kim, E. H.; Choi, K. S

    2000-10-01

    This report is the revised Environmental Impact Assessment Report which was made and submitted as one of the license documents for TRIGA Research Reactor D and D Project. The Environmental Impact Assessment Report includes introduction of decommissioning plan, status of reactors and environmental impact of surroundings. Also it was assessed and analyzed on radioactivity for environment, and the plan was established to minimize radioactive material release. Finally environmental monitoring plan was established to confirm whether contaminated or not from radioactivity during decommissioning period. According to the assessment results, the risk of excess exposure will be not on environment and public. The first Environmental Impact Assessment Report was submitted to the government for the license and reviewed by Korea Institute of Nuclear Safety. The first Report was revised including answers for the questions arising from review process.

  1. Environment: Development plan 1993

    International Nuclear Information System (INIS)

    1992-01-01

    The concept of sustainable development is gradually being incorporated into the activities of Hydro-Quebec as part of that utility's environmental policy. In its proposed development plan, Hydro-Quebec's principal strategic environmental orientations comprise making environmental concerns an integral part of the planning process, managing impacts associated with the construction of generating and transmission facilities, and evaluating the utility's environmental performance. The approaches used, tools to be developed, and information required in each of these orientations are described. Issues considered include the strategic choices available for meeting electricity requirements, including renewable energy sources; the evaluation of environmental externalities; the use of environmental impact assessment studies and environmental monitoring; relationships with native peoples and mitigation of the social impacts of northern hydroelectric development; protection and management of natural and human habitats; the utility's contribution to regional development; management of wastes and rights-of-way; and environmental auditing. 1 tab

  2. Monitoring plan and maintenance NPP the Vandellos I and future prospects; Plan de vigilancia y mantenimiento de la instalacion nuclear Vandellos 1 y perspectivas de futuro

    Energy Technology Data Exchange (ETDEWEB)

    Margalef Escoda, S.

    2013-07-01

    This paper intends to give to know the singularities of an installation phase of latency and your monitoring and maintenance plan. the horizons that has the installation medium-term to guide the future dismantling level 3 monitoring and maintenance activities are also described.

  3. The implementation of the Plan Esperanza and response to the imPACT Review.

    Science.gov (United States)

    Vidaurre, Tatiana; Santos, Carlos; Gómez, Henry; Sarria, Gustavo; Amorin, Edgar; López, Marga; Regalado, Roxana; Manrique, Javier; Tarco, Duniska; Ayestas, Carlos; Calderón, Mónica; Mas, Luis; Neciosup, Silvia; Salazar, Miriam; Chávez, Juan Carlos; Ubillus, Milward; Limache, Abel; Ubillus, José Carlos; Navarro, Jeannie; Sarwal, Kavita; Sutcliffe, Simon; Gutiérrez-Aguado, Alfonso; Silva, Marianela; Mena, Amalia; Guillén, María Eugenia; Castañeda, Carlos; Abugattas, Julio

    2017-10-01

    Following the implementation of the National Cancer Prevention and Control Results-based Budget Programme (PpR Cancer-024) in 2011, the Peruvian Government approved the Plan Esperanza-a population-based national cancer control plan-in 2012. Legislation that ensured full government-supported funding for people who were otherwise unable to access or afford care and treatment accompanied the Plan. In 2013, the Ministry of Health requested an integrated mission of the Programme of Action for Cancer Therapy (imPACT) report to strengthen cancer control in Peru. The imPACT Review, which was executed in 2014, assessed Peru's achievements in cancer control, and areas for improvement, including cancer control planning, further development of population-based cancer registration, increased prevention, early diagnosis, treatment and palliative care, and the engagement and participation of civil society in the health-care system. This Series paper gives a brief history of the development of the Plan Esperanza, describes the innovative funding model that supports it, and summarises how funds are disseminated on the basis of disease, geography, and demographics. An overview of the imPACT Review, and the government's response in the context of the Plan Esperanza, is provided. The development and execution of the Plan Esperanza and the execution of and response to the imPACT Review demonstrates the Peruvian Government's commitment to fighting cancer across the country, including in remote and urban areas. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Burial Grounds

    International Nuclear Information System (INIS)

    2006-01-01

    The U.S. Department of Energy Order 435.1, Radioactive Waste Management, requires a disposal authorization statement authorizing operation (or continued operation) for low-level waste disposal facilities. In fulfillment of these requirements, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area burial grounds and the 200 West Area burial grounds. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area low-level burial grounds be written and approved by the Richland Operations Office. As a result of a record of decision for the Hanford Site Solid Waste Program and acceptance of the Hanford Site Solid Waste Environmental Impact Statement, the use of the low-level burial ground (LLBG) as a disposal facility for low-level and mixed low-level wastes has been restricted to lined trenches and the Navy reactor-compartment trench only. Hence, as of July 2004, only the two lined trenches in burial ground 218-W-5 (trenches 31 and 34, see Appendix A) and the Navy reactor-compartment trench in burial ground 218 E 12B (trench 94) are allowed to receive waste. When the two lined trenches are filled, the LLBG will cease to operate except for reactor compartment disposal at trench 94. Remaining operational lifetime of the LLBG is dependent on waste volume disposal rates. Existing programs for air sampling and analyses and subsidence monitoring are currently adequate for performance assessment at the LLBG. The waste disposal authorization for the Hanford Site is based (in part) on the post-closure performance assessments for the LLBG. In order to maintain a useful link between operational monitoring (e.g., Resource Conservation and Recovery Act [RCRA], Comprehensive Environmental Response, Compensation, and Liability Act, and State Waste Discharge Permits), constituents, monitoring frequencies, and boundaries require

  5. Drafting a monitoring plan for the ROAD project under the EU CCS directive

    NARCIS (Netherlands)

    Steegs, T.P.H.; Neelse, F.P.; Gittins, C.; Ros, M.

    2014-01-01

    The Rotterdam Capture and Storage Demonstration Project (ROAD) is an integrated CCS project in the Netherlands that has recently completed the storage permitting process. Development of the monitoring and contingency plans is a key component of this process. Our paper discusses the development of

  6. 76 FR 44604 - Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact...

    Science.gov (United States)

    2011-07-26

    ... Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact Statement AGENCY... availability of the Draft Anacostia Park Wetland and Resident Canada Goose Management Plan/Environmental Impact... resident Canada geese. Action is needed at this time to manage the restored wetlands at the Park. The Plan...

  7. 77 FR 74027 - Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone...

    Science.gov (United States)

    2012-12-12

    ...] Winter Use Plan, Final Environmental Impact Statement Amended Record of Decision, Yellowstone National... Availability of Amended Record of Decision for the Final Environmental Impact Statement for a Winter Use Plan... Record of Decision for the Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and...

  8. 76 FR 77249 - Winter Use Plan, Final Environmental Impact Statement Record of Decision, Yellowstone National...

    Science.gov (United States)

    2011-12-12

    ... DEPARTMENT OF THE INTERIOR National Park Service Winter Use Plan, Final Environmental Impact... Impact Statement for a Winter Use Plan, Yellowstone National Park. SUMMARY: Pursuant to Sec. 102(2)(C) of... Winter Use Plan for Yellowstone National Park, located in Idaho, Montana, and Wyoming. On December 5...

  9. Reliability-Based Design and Planning of Inspection and Monitoring of Offshore Wind Turbines

    DEFF Research Database (Denmark)

    Marquez-Dominguez, Sergio

    Maintaining and developing a sustainable wind industry is the main motivation of this PhD thesis entitled “Reliability-based design and planning of inspection and monitoring of offshore wind turbines”. In this thesis, statistical methods and probability theory are important mathematical tools used...... and offshore wind turbine foundations with the aim of improving the design, decreasing structural costs and increasing benefits. Recently, wind energy technology has started to adopt risk and reliability based inspection planning (RBI) as a methodology based on Bayesian decision theories together...

  10. SU-E-T-110: An Investigation On Monitor Unit Threshold and Effects On IMPT Delivery in Proton Pencil Beam Planning System

    International Nuclear Information System (INIS)

    Syh, J; Ding, X; Syh, J; Patel, B; Rosen, L; Wu, H

    2015-01-01

    Purpose: An approved proton pencil beam scanning (PBS) treatment plan might not be able to deliver because of existed extremely low monitor unit per beam spot. A dual hybrid plan with higher efficiency of higher spot monitor unit and the efficacy of less number of energy layers were searched and optimized. The range of monitor unit threshold setting was investigated and the plan quality was evaluated by target dose conformity. Methods: Certain limitations and requirements need to be checks and tested before a nominal proton PBS treatment plan can be delivered. The plan needs to be met the machine characterization, specification in record and verification to deliver the beams. Minimal threshold of monitor unit, e.g. 0.02, per spot was set to filter the low counts and plan was re-computed. Further MU threshold increment was tested in sequence without sacrificing the plan quality. The number of energy layer was also alternated due to elimination of low count layer(s). Results: Minimal MU/spot threshold, spot spacing in each energy layer and total number of energy layer and the MU weighting of beam spots of each beam were evaluated. Plan optimization between increases of the spot MU (efficiency) and less energy layers of delivery (efficacy) was adjusted. 5% weighting limit of total monitor unit per beam was feasible. Scarce spreading of beam spots was not discouraging as long as target dose conformity within 3% criteria. Conclusion: Each spot size is equivalent to the relative dose in the beam delivery system. The energy layer is associated with the depth of the targeting tumor. Our work is crucial to maintain the best possible quality plan. To keep integrity of all intrinsic elements such as spot size, spot number, layer number and the carried weighting of spots in each layer is important in this study

  11. Impact assessment of land use planning driving forces on environment

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Longgao, E-mail: chenlonggao@163.com [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); Yang, Xiaoyan [Institute of Land Resources, Jiangsu Normal University (JSNU), Xuzhou 221116 (China); School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Chen, Longqian [School of Environment and Spatial Informatics, China University of Mining and Technology, Xuzhou 221116 (China); Li, Long [Department of Geography, Vrije Universiteit Brussel, Brussels 1050 (Belgium)

    2015-11-15

    Land use change may exert a negative impact on environmental quality. A state–impact–state (SIS) model describing a state transform under certain impacts has been integrated into land use planning (LUP) environmental impact assessment (LUPEA). This logical model is intuitive and easy to understand, but the exploration of impact is essential to establish the indicator system and to identify the scope of land use environmental impact when it is applied to a specific region. In this study, we investigated environmental driving forces from land use planning (LUPF), along with the conception, components, scope, and impact of LUPF. This method was illustrated by a case study in Zoucheng, China. Through the results, we concluded that (1) the LUPF on environment are impacts originated from the implementation of LUP on a regional environment, which are characterized by four aspects: magnitude, direction, action point, and its owner; (2) various scopes of LUPF on individual environmental elements based on different standards jointly define the final scope of LUPEA; (3) our case study in Zoucheng demonstrates the practicability of this proposed approach; (4) this method can be embedded into LUPEA with direction, magnitudes, and scopes of the LUPF on individual elements obtained, and the identified indicator system can be directly employed into LUPEA and (5) the assessment helps to identify key indicators and to set up a corresponding strategy to mitigate the negative impact of LUP on the environment, which are two important objectives of strategic environmental assessment (SEA) in LUP. - Highlights: • Environmental driving forces from land use planning (LUPF) are investigated and categorized. • Our method can obtains the direction, magnitudes and scopes of environmental driving forces. • The LUPEA scope is determined by the combination of various scopes of LUPF on individual elements. • LUPF assessment can be embedded into LUPEA. • The method can help to

  12. Evaluation and prioritization of stream habitat monitoring in the Lower Columbia Salmon and Steelhead Recovery Domain as related to the habitat monitoring needs of ESA recovery plans

    Science.gov (United States)

    Puls, Amy L.; Anlauf Dunn, Kara; Graham Hudson, Bernadette

    2014-01-01

    The lower Columbia River and its tributaries once supported abundant runs of salmon and steelhead; however, there are five species currently listed under the federal Endangered Species Act (ESA). The National Marine Fisheries Service has completed, and is proposing for adoption, a comprehensive ESA Recovery Plan for the Lower Columbia Evolutionarily Significant Units (ESUs) based on the recovery plans developed by Oregon and Washington. One of the primary factors attributed to the decline of these species is habitat degradation. There are numerous entities conducting status and/or trends monitoring of instream habitat in the lower Columbia River Basin, but because the programs were developed for agency specific reasons, the existing monitoring efforts are not well coordinated, and often lack the spatial coverage, certainty, or species coverage necessary to answer questions related to status and trends of the ESA listed populations. The Pacific Northwest Aquatic Monitoring Partnership’s Integrated Status and Trends Monitoring (ISTM) project was initiated to improve integration of existing and new monitoring efforts by developing recommendations for sampling frames, protocols, and data sharing. In an effort to meet the ISTM project goals, five objectives were identified: (1) identify and prioritize decisions, questions, and monitoring objectives, (2) evaluate how existing programs align with these management decisions, questions, and objectives, (3) identify the most appropriate monitoring design to inform priority management decisions, questions, and objectives, (4) use trade-off analysis to develop specific recommendations for monitoring based on outcomes of Objectives 1-3 and (5) recommend implementation and reporting mechanisms. This report summarizes the effort to address Objectives 1 and 2, detailing the commonalities among the habitat characteristics that all entities measure and monitor, and how the metrics align with the priorities listed in the

  13. Emergency radiological monitoring and analysis: Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1995-01-01

    The US Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted State(s) and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division (M ampersand A) is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC M ampersand A and the content and preparation of the manual

  14. Groundwater screening evaluation/monitoring plan: 200 Area Treated Effluent Disposal Facility (Project W-049H). Revision 1

    International Nuclear Information System (INIS)

    Barnett, D.B.; Davis, J.D.; Collard, L.B.; Freeman, P.B.; Chou, C.J.

    1995-05-01

    This report consists of the groundwater screening evaluation required by Section S.8 of the State Waste Discharge Permit for the 200 Area TEDF. Chapter 1.0 describes the purpose of the groundwater monitoring plan. The information in Chapter 2.0 establishes a water quality baseline for the facility and is the groundwater screening evaluation. The following information is included in Chapter 2.0: Facility description;Well locations, construction, and development data; Geologic and hydrologic description of the site and affected area; Ambient groundwater quality and current use; Water balance information; Hydrologic parameters; Potentiometric map, hydraulic gradients, and flow velocities; Results of infiltration and hydraulic tests; Groundwater and soils chemistry sampling and analysis data; Statistical evaluation of groundwater background data; and Projected effects of facility operation on groundwater flow and water quality. Chapter 3.0 defines, based on the information in Chapter 2.0, how effects of the TEDF on the environment will be evaluated and how compliance with groundwater quality standards will be documented in accordance with the terms and conditions of the permit. Chapter 3.0 contains the following information: Media to be monitored; Wells proposed as the point of compliance in the uppermost aquifer; Basis for monitoring well network and evidence of monitoring adequacy; Contingency planning approach for vadose zone monitoring wells; Which field parameters will be measured and how measurements will be made; Specification of constituents to be sampled and analyzed; and Specification of the sampling and analysis procedures that will be used. Chapter 4.0 provides information on how the monitoring results will be reported and the proposed frequency of monitoring and reporting. Chapter 5.0 lists all the references cited in this monitoring plan. These references should be consulted for additional or more detailed information

  15. Monitoring of the radiological environmental impact of the AREVA site of Tricastin

    International Nuclear Information System (INIS)

    Mercat, C.; Brun, F.; Florens, P.; Petit, J.; Garnier, F.; Devin, P.

    2010-01-01

    Set up at the beginning of the site's operations, in 1962, the monitoring of the radiological environmental impact of the AREVA site of Tricastin has evolved over time to meet more specifically the multiple objectives of environmental monitoring: to prove the respect of the commitments required by the authorities, to be able to detect a dysfunction in the observed levels, to enable the assessment of impacts of industrial activities, to ensure the balance between environmental quality and the use made by the local population and to inform the public of the radiological state of the environment. Thousands of data were acquired on the radioactivity of all environmental compartments as well as on the functioning of local ecosystems. Today, the Network of Environmental Monitoring of AREVA Tricastin goes beyond the requirements of routine monitoring to provide innovative solutions for monitoring the radioactivity (especially for uranium) in the environment. (author)

  16. 78 FR 73559 - Moose-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton...

    Science.gov (United States)

    2013-12-06

    ...-Wilson Corridor Comprehensive Management Plan, Environmental Impact Statement, Grand Teton National Park... is preparing a Comprehensive Management Plan and Environmental Impact Statement (EIS) for the Moose...; (2) distinguish the corridor's fundamental and other important resources and values; (3) clearly...

  17. 76 FR 27344 - Water Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San...

    Science.gov (United States)

    2011-05-11

    ... and resource management activities must be guided by general principles that can be applied to... Resources Management Plan/Environmental Impact Statement, Mojave National Preserve, San Bernardino County... Management Plan/ Environmental Impact Statement for Mojave National Preserve. SUMMARY: In accordance with Sec...

  18. 77 FR 16558 - General Management Plan/Final Environmental Impact Statement, Hampton National Historic Site...

    Science.gov (United States)

    2012-03-21

    ... Management Plan/Final Environmental Impact Statement, Hampton National Historic Site, Maryland AGENCY...) announces the availability of the Final Environmental Impact Statement for the General Management Plan.../Baltimore County Library, 320 York Avenue, Towson, Maryland 21204. Baltimore County Tourism Office and...

  19. Description and Rationale for the Planning, Monitoring, and Implementation (PMI) Model: Description.

    Science.gov (United States)

    Ford, Valeria A.

    The design of the Planning, Monitoring, and Implementation Model (PMI) and the aspects of the model that make it useful in public schools are the topics of this paper. After the objectives of a program or operation have been identified, the model specifies three additional pieces of information that are needed for an evaluation: inputs, processes,…

  20. Monitoring the impact of simulated deep-sea mining in Central Indian Basin

    Digital Repository Service at National Institute of Oceanography (India)

    Sharma, R.; Nath, B.N.; Jaisankar, S.

    Monitoring the Impact of Simulated Deep-sea Mining in Central Indian Basin R. SHARMA, B. NAGENDER NATH, AND S. JAI SANKAR National Institute of Oceanography, Dona Paula, Goa, India Monitoring of deep-sea disturbances, natural or man-made, has gained... has shown a partial recovery of the benthic ecosystem, with indications of restoration and recolonization. Keywords deep-sea mining, environmental impact, Central Indian Basin Deep-sea mineral deposits such as the polymetallic nodules and crusts...

  1. Combination RCRA groundwater monitoring plan for the 216-A-10, 216-A-36B, and 216-A-37-1 PUREX cribs

    International Nuclear Information System (INIS)

    Lindberg, J.W.

    1997-06-01

    This document presents a groundwater quality assessment monitoring plan, under Resource Conservation and Recovery Act of 1976 (RCRA) regulatory requirements for three RCRA sites in the Hanford Site's 200 East Area: 216-A-10, 216-A-36B, and 216-A-37-1 cribs (PUREX cribs). The objectives of this monitoring plan are to combine the three facilities into one groundwater quality assessment program and to assess the nature, extent, and rate of contaminant migration from these facilities. A groundwater quality assessment plan is proposed because at least one downgradient well in the existing monitoring well networks has concentrations of groundwater constituents indicating that the facilities have contributed to groundwater contamination. The proposed combined groundwater monitoring well network includes 11 existing near-field wells to monitor contamination in the aquifer in the immediate vicinity of the PUREX cribs. Because groundwater contamination from these cribs is known to have migrated as far away as the 300 Area (more than 25 km from the PUREX cribs), the plan proposes to use results of groundwater analyses from 57 additional wells monitored to meet environmental monitoring requirements of US Department of Energy Order 5400.1 to supplement the near-field data. Assessments of data collected from these wells will help with a future decision of whether additional wells are needed

  2. 3D monitoring of active tectonic structures

    Czech Academy of Sciences Publication Activity Database

    Stemberk, Josef; Košťák, Blahoslav; Vilímek, V.

    2003-01-01

    Roč. 36, 1-2 (2003), s. 103-112 ISSN 0264-3707 R&D Projects: GA MŠk OC 625.10 Institutional research plan: CEZ:AV0Z3046908 Keywords : tectonics * monitoring * active structures Subject RIV: DB - Geology ; Mineralogy Impact factor: 0.754, year: 2003

  3. Monitoring: The missing piece

    Energy Technology Data Exchange (ETDEWEB)

    Bjorkland, Ronald, E-mail: r_bjorkland@hotmail.com

    2013-11-15

    The U.S. National Environmental Policy Act (NEPA) of 1969 heralded in an era of more robust attention to environmental impacts resulting from larger scale federal projects. The number of other countries that have adopted NEPA's framework is evidence of the appeal of this type of environmental legislation. Mandates to review environmental impacts, identify alternatives, and provide mitigation plans before commencement of the project are at the heart of NEPA. Such project reviews have resulted in the development of a vast number of reports and large volumes of project-specific data that potentially can be used to better understand the components and processes of the natural environment and provide guidance for improved and efficient environmental protection. However, the environmental assessment (EA) or the more robust and intensive environmental impact statement (EIS) that are required for most major projects more frequently than not are developed to satisfy the procedural aspects of the NEPA legislation while they fail to provide the needed guidance for improved decision-making. While NEPA legislation recommends monitoring of project activities, this activity is not mandated, and in those situations where it has been incorporated, the monitoring showed that the EIS was inaccurate in direction and/or magnitude of the impact. Many reviews of NEPA have suggested that monitoring all project phases, from the design through the decommissioning, should be incorporated. Information gathered though a well-developed monitoring program can be managed in databases and benefit not only the specific project but would provide guidance how to better design and implement future activities designed to protect and enhance the natural environment. -- Highlights: • NEPA statutes created profound environmental protection legislative framework. • Contrary to intent, NEPA does not provide for definitive project monitoring. • Robust project monitoring is essential for enhanced

  4. 1988 Monitoring Activities Review (MAR) of the environmental monitoring program

    International Nuclear Information System (INIS)

    1989-03-01

    The EGandG Idaho Environmental Monitoring (EM) Unit is responsible for coordinating and conducting environmental measurements of radioactive and hazardous contaminants around facilities operated by EGandG Idaho. The EM Unit has several broad program objectives, which include complying with regulatory standards and developing a basis for estimating future impacts of operations at EGandG Idaho facilities. To improve program planning and to provide bases for technical improvement of the monitoring program, the EGandG Environmental Monitoring organization has regularly used the Monitoring Activities Review (MAR) process since 1982. Each MAR is conducted by a committee of individuals selected for their experience in the various types of monitoring performed by the EM organization. Previous MAR studies have focused on procedures for all currently monitored media except biota. Biotic monitoring was initiated following the last MAR. This report focuses on all currently monitored media, and includes the first review of biotic monitoring. The review of biotic monitoring has been conducted at a level of detail consistent with initial MAR reports for other parts of the Waste Management Program Facilities Environmental Monitoring Program. The review of the biotic monitoring activities is presented in Section 5.5 of this report. 21 refs., 7 figs., 4 tabs

  5. Using cone beam computed thomography in planning the extraction of impacted third molars

    Directory of Open Access Journals (Sweden)

    Vlahović Zoran

    2016-01-01

    Full Text Available The panoramic radiography is the most used diagnostic imaging method in planning impacted lower third molar extractions. However, often panoramic radiography does not provide enough information in treatment planning for performing safely surgical extraction of impacted third molars. CBCT (Cone beam computed tomography provides more precise information in diagnostic analysis especially for planning surgical procedures where complications can be expected due to close relationship between mandibular canal and lower impacted third molars. The aim of this study is comparative analysis of panoramic radiography and CBCT in evaluating the topographic relationship between mandibular canal and impacted third molars. The study included 50 patients with close relationship between mandibular canal and impacted third molars detected using panoramic radiography. After panoramic radiography analysis CBCT was performed in order to diagnose, plan and prevent complications during the surgical tooth extraction. CBCT examination considered comparative analysis with panoramic radiography, marking, volume rendering and assessment of mandibular canal in buccolingual direction. Out of total patients where suprimposition of mandibular canal and impacted third molar on panoramic radiography was detected, in 32 patients mandibular chanal was localised on lingual side. Mandibular canal was positioned at bucal side in 18 of 50 patients. Results of this research indicate that panoramic radiography can be useful in everyday practice for diagnosis, planning and preparing lower third molar extractions, but in cases where close relationship between mandibular canal and lower third molars is detected CBCT is recommended as more precise radiographic imaging method in order to prevent complications.

  6. Planning and development of wind farms: Environmental impact and grid connection

    DEFF Research Database (Denmark)

    Clausen, Niels-Erik

    These course notes are intended for the three-week course 46200 Planning and Development of Wind Farms given by DTUWind Energy, Technical University of Denmark. The purpose of the course notes is to give an introduction to planning procedures, environmental impact assessments, and grid connection....

  7. 77 FR 38824 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-06-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0070-422] Winter Use Plan, Supplemental.... ACTION: Notice of Availability of the Draft Supplemental Environmental Impact Statement for the Winter... Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan for Yellowstone National Park...

  8. Monitored retrievable storage program. Status and plans for meeting NWPA requirements

    International Nuclear Information System (INIS)

    Hall, R.J.; Fletcher, J.F.

    1983-12-01

    Accomplishments of the Monitored Retrieval Storage (MRS) Program since passage of the Nuclear Waste Policy Act of 1982 (NWPA) are as follows: (1) R and D needs report was submitted; (2) conceptual design analysis of 8 MRS concepts was performed; (3) selection of two MRS concepts (primary, alternative) are underway; (4) Parson/Westinghouse/Golder were selected as architect-engineer; (5) functional design criteria were established; (6) reports to accompany proposal were defined; and (7) evaluations of mission, cost-effectiveness, deployment time were performed. Future work, plans and schedule include completion of facility advanced conceptual design and accompanying design reports in early 1985, for submittal with proposal in June. Designs are being prepared for the primary concept, and in less detail, for the alternate. Three separate site locations will be assumed for each concept. A siting plan, to accompany the proposal, will also be completed in early 1985, as will an environmental assessment now under preparation. It is planned that the proposal be accompanied by several reports augmenting the planning base for post-proposal actions, to be activated at the time MRS deployment is authorized by Congress. 9 figures

  9. A case study predicting environmental impacts of urban transport planning in China.

    Science.gov (United States)

    Chen, Chong; Shao, Li-guo; Xu, Ling; Shang, Jin-cheng

    2009-10-01

    Predicting environmental impacts is essential when performing an environmental assessment on urban transport planning. System dynamics (SD) is usually used to solve complex nonlinear problems. In this study, we utilized system dynamics (SD) to evaluate the environmental impacts associated with urban transport planning in Jilin City, China with respect to the local economy, society, transport, the environment and resources. To accomplish this, we generated simulation models comprising interrelated subsystems designed to utilize changes in the economy, society, road construction, changes in the number of vehicles, the capacity of the road network capacity, nitrogen oxides emission, traffic noise, land used for road construction and fuel consumption associated with traffic to estimate dynamic trends in the environmental impacts associated with Jilin's transport planning. Two simulation scenarios were then analyzed comparatively. The results of this study indicated that implementation of Jilin transport planning would improve the current urban traffic conditions and boost the local economy and development while benefiting the environment in Jilin City. In addition, comparative analysis of the two scenarios provided additional information that can be used to aid in scientific decision-making regarding which aspects of the transport planning to implement in Jilin City. This study demonstrates that our application of the SD method, which is referred to as the Strategic Environmental Assessment (SEA), is feasible for use in urban transport planning.

  10. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    International Nuclear Information System (INIS)

    Ballinger, M.Y.; Shields, K.D.

    1999-01-01

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP

  11. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, M.Y.; Shields, K.D.

    1999-04-02

    The Pacific Northwest National Laboratory (PNNL) operates a number of research and development (R and D) facilities for the Department of Energy on the Hanford Site. According to DOE Order 5400.1, a Facility Effluent Monitoring Plan is required for each site, facility, or process that uses, generates, releases, or manages significant pollutants or hazardous materials. Three of the R and D facilities: the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling and thus individual Facility Effluent Monitoring Plans (FEMPs) have been developed for them. Because no definition of ''significant'' is provided in DOE Order 5400.1 or the accompanying regulatory guide DOE/EH-0173T, this FEMP was developed to describe monitoring requirements in the DOE-owned, PNNL-operated facilities that do not have individual FEMPs. The remainder of the DOE-owned, PNNL-operated facilities are referred to as Balance-of-Plant (BOP) facilities. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R and D. R and D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in the FEMP.

  12. Baseline requirements for assessment of mining impact using biological monitoring

    International Nuclear Information System (INIS)

    Humphrey, C.L.; Dostine, P.L.

    1995-01-01

    Biological monitoring programmes for environmental protection should provide for both early detection of possible adverse effects, and assessment of the ecological significance of these effects. Monitoring techniques are required that include responses sensitive to the impact, that can be subjected to rigorous statistical analysis and for which statistical power is high. Such issues in baseline research of 'what and how to measure?' and 'for how long?' have been the focus of a programme being developed to monitor and assess effects of mining operations on the essentially pristine, freshwater ecosystems of the Alligator Rivers Region (ARR) in tropical northern Australia. Application of the BACIP (Before, After, Control, Impact, Paired differences) design, utilizing a form of temporal replication, to univariate (single species) and multivariate (community) data is described. The BACIP design incorporates data from single control and impact sites. We argue for modification of the design for particular studies conducted in streams, to incorporate additional independent control sites from adjacent catchment. Inferential power, by way of (i) more confidently attributing cause to an observed change and (ii) providing information about the ecological significance of the change, will be enhanced using a modified BACIP design. In highly valued environments such as the ARR, monitoring programmes require application of statistical tests with high power to guarantee that an impact no greater than a prescribed amount has gone undetected. A minimum number of baseline years using the BACIP approach would therefore be required in order to achieve some desired level of statistical power. This paper describes the results of power analyses conducted on 2-5 years (depending upon the technique) of baseline data from streams of the ARR and discuss the implications of these results for management. 44 refs., 1 tab., 3 figs

  13. Social impact assessment and management methodology using social indicators and planning strategies

    International Nuclear Information System (INIS)

    Olsen, M.E.; Curry, M.G.; Greene, M.R.; Melber, B.D.; Merwin, D.J.

    1978-08-01

    The scope of environmental impact statements prepared during the past few years has steadily expanded to incorporate all aspects of the social as well as the natural environment, including demographic, economic, social, political, and cultural conditions. Broadly conceived, social impacts are alterations in people's living conditions that occur in conjunction with a new policy, program, or project, and that (1) are in addition to all other concurrent changes produced by other factors, and (2) are seen by those affected as significant social events. Since any social environment is constantly changing, the crucial problems in analyzing social impacts are to identify those social alterations that are a direct or indirect result of the specific action under examination, apart from all other events and changes, and to determine which of these alterations are having significant social effects on the people involved. Three features of this conception of social impacts are especially noteworthy. First, although impacts are often thought of as undesirable or detrimental in nature, they may also be desirable or beneficial. Second, although impacts are often described as caused by prior intervening innovations, in reality they always interact with their original causes in a reciprocal process, either immediately or after some time lag. Third, the purpose of social impact assessment is to enable policy makers to anticipate and plan for potential impacts before they occur, and then act to prevent or mitigate undesired impacts. A new methodology for performing social impact assessment and management studies that meet current needs by emphasizing standardized social indicators and social planning techniques is proposed. We refer to our approach as the Social Impact and Planning (SIP) method of social impact assessment

  14. Beliefs about the Potential Impacts of Exploiting Non-Timber Forest Products Predict Voluntary Participation in Monitoring

    Science.gov (United States)

    Dantas Brites, Alice; Morsello, Carla

    2017-06-01

    Harvesting and trading non-timber forest products is advocated as a win-win strategy for conservation and development, yet it can produce negative ecological and socioeconomic impacts. Hence, monitoring exploitation outcomes is essential, and participatory monitoring has been suggested to be the most suitable approach. Among possible approaches, participatory monitoring is preferred because it is likely to increase people's awareness and beliefs regarding impacts or potential impacts, thus inducing behavioral changes, although the evidence in this regard is contradictory. We therefore evaluated whether people's beliefs about the potential ecological and socioeconomic impacts of non-timber forest product exploitation increased their likelihood of volunteering to monitor. We studied a community of forest inhabitants in the Brazilian Amazon who harvested and traded a commercially important non-timber forest product. Two methods of data gathering were employed: (i) a survey of 166 adults (51 households) to evaluate people's beliefs and their stated intention to engage in four different monitoring tasks and (ii) four pilot monitoring tasks to evaluate who actually participated. Based on mixed-effects regressions, the results indicated that beliefs regarding both types of impacts could predict participation in certain tasks, although gender, age and schooling were occasionally stronger predictors. On average, people had stronger beliefs about potential socioeconomic impacts than about potential ecological impacts, with the former also predicting participation in ecological data gathering. This finding reinforces the importance of monitoring both types of impacts to help achieve the win-win outcomes originally proposed by non-timber forest product trade initiatives.

  15. T Tank Farm Interim Surface Barrier Demonstration--Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z. F.; Keller, Jason M.; Strickland, Christopher E.

    2007-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank in 1973. Many of the contaminants from that leak still reside within the vadose zone beneath the T Tank Farm. CH2M Hill Hanford Group, Inc. seeks to minimize movement of this residual contaminant plume by placing an interim barrier on the surface. Such a barrier is expected to prevent infiltrating water from reaching the plume and moving it further. A plan has been prepared to monitor and determine the effectiveness of the interim surface barrier. Soil water content and water pressure will be monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. In fiscal year 2006, two instrument nests were installed. Each instrument nest contains a neutron probe access tube, a capacitance probe, four heat-dissipation units, and a drain gauge to measure soil water flux. A meteorological station has been installed outside of the fence. In fiscal year 2007, two additional instrument nests are planned to be installed beneath the proposed barrier.

  16. Monitoring plan for long-term environmental measurements at the proposed Douglas Point Ecological Laboratory, Nanjemoy, Maryland

    International Nuclear Information System (INIS)

    Jensen, B.L.; Miles, K.J.; Strass, P.K.; McDonald, B.S.; Nugent, A.

    1979-01-01

    The Douglas Point Ecological Laboratory has been set up at the site of a proposed power plant, which is to be powered by either nuclear, coal, or an alternate form of fuel. A plan for long-range monitoring of terrestrial ecosystems and atmospheric chemistry is presented. A site characterization study will be made initially. Chemical and physical soil profiles will be established with continuous measurement of soil moisture and nutrient content, as well as other parameters. Data sets will be established, reflecting changes in rainfall pH and rate of deposition through precipitation and dryfall sedimentation of Ca 2+ , Mg 2+ , K + , Na + , SO 4 3- , Cl - , NH 4 + , and NO 3 - . Among other objectives are the development of new monitoring techniques that can be used to trace energy flow, nutrient transport, and radionuclide transport through all trophic levels to selected carnivores. The atmospheric monitoring plan is outlined as to system design and specifications; system installation, operation, and maintenance, data processing and reports; quality assurance program; and project organization. A discussion of administrative and operational monitoring costs is included

  17. Implementation of the monitoring Plan of the State and behavior of the systems in the Central Nuclear Almaraz

    International Nuclear Information System (INIS)

    Montero Puertas, I.; Gonzalez Redondo, R.; Lopez Pozo, A.

    2013-01-01

    This work aims to present the implementation process of the Monitoring of the State and behavior of the systems in the Nuclear plan Almaraz. Will define the scope, process, frequencies and criteria of evaluation of the State and behavior of the systems included in the Plan of reliability, as well as the documentary requirements of this evaluation. Cases will also be collected practical real phenomena detected during monitoring degradation made and will explain the actions taken prior to the failure.

  18. Using a Service Planning Approach to Improve the Impact of Earth Observations in the Developing World

    Science.gov (United States)

    Irwin, D.; Frankel-Reed, J.

    2017-12-01

    SERVIR is joint development initiative of the National Aeronautics and Space Administration (NASA) and the United States Agency for International Development (USAID), working in partnership with leading regional organizations around the world to help developing countries use information provided by Earth observing satellites and geospatial technologies to empower decision-makers with tools, products, and services to better address critical issues related to food security, water resources, natural disasters, and land use. Since its launch in 2005, SERVIR has grown into a global network of four active hubs that are improving awareness, increasing access to information, and supporting analysis to help people in Africa, Hindu Kush Himalaya, and the Lower Mekong regions better manage today's complex environmental challenges. To help improve the impact of SERVIR activities throughout the global network, a Service Planning Approach was developed with three main steps that involve: 1) consultation and needs assessment, 2) service design and 3) service delivery. To successfully accomplish these steps, SERVIR has created a series of capacity building tools that focus on specific activities to better engage stakeholders, design a more successful service, and to conduct end-to-end monitoring, evaluation, and learning. Currently, all four SERVIR hubs in different regions of the world are implementing this Service Planning Approach and helping to improve it by providing feedback based on their implementation. This presentation will describe the SERVIR Service Planning Approach and discuss the various tools, which ultimately can empower remote sensing scientists and application developers to obtain a greater impact from the Earth Observation products they develop.

  19. Monitoring Plan for Fiscal Year 1999 Borehole Logging at 200 East Area Specific Retention Facilities

    International Nuclear Information System (INIS)

    Horton, D.G.

    1999-01-01

    The Hanford Groundwater Monitoring Project's vadose zone monitoring effort for fiscal year (FY) 1999 involves monitoring 30 boreholes for moisture content and gamma-ray emitting radionuclides. The boreholes are associated with specific retention trenches and cribs in the 200 East Area of the Hanford Site. The facilities to be monitored are the 216-A-2, -4, and -7 cribs, the 216-A-18 trench, the 216-B-14 through -19 cribs, the 216-B-20 through -34, -53A, and -58 trenches, the 216-B-35 through -42 trenches, and the 216-C-5 crib. This monitoring plan describes the facilities and the vadose zone at the cribs and trenches to be monitored; the field activities to be accomplished; the constituents of interest and the monitoring methods, including calibration issues; and the quality assurance and quality control requirements governing the monitoring effort. The results from the FY 1999 monitoring will show the current configuration of subsurface contamination and will be compared with past monitoring results to determine whether changes in contaminant distribution have occurred since the last monitoring effort

  20. Foraging traces as an indicator to monitor wild boar impact on ground nesting birds.

    OpenAIRE

    Roda , Fabrice; Roda , Jean-Marc

    2016-01-01

    The successful management of large herbivores requires the monitoring of a set of indicators of ecological change describing animal performance, relative animal abundance, and ungulate impact on habitat. Wild boar populations increases have been spectacular in many countries including France. Wild boars can have a substantial environmental impact on many ecosystem components including birds, but indicators to monitor such impact are currently lacking. In this paper, we examined the usefulness...

  1. Connected vehicle impacts on transportation planning technical memorandum #2 : connected vehicle planning processes and products and stakeholder roles and responsibilities.

    Science.gov (United States)

    2015-01-01

    The objective of this project, Connected Vehicle Impacts on Transportation Planning, is to comprehensively assess how connected vehicles should : be considered across the range of transportation planning processes and products developed by Stat...

  2. Monitoring and Evaluation of Volunteer Tourism

    DEFF Research Database (Denmark)

    Taplin, Jessica; Dredge, Dianne; Scherrer, Pascal

    2014-01-01

    The rapid expansion and commercialisation of the volunteer tourism sector and the potential for negative impacts on host communities have put the sector under increasing scrutiny. Monitoring and evaluation are key aspects of sustainable tourism planning and management, and play important roles...... in the project planning and implementation cycles of volunteer tourism organisations and destination managements. However, they can be both value-laden and politically charged, making an understanding of context, purpose and various approaches to monitoring and evaluation important. Drawing from evaluation...... highlights the important influence of context (the issue the volunteer tourism programme is addressing, the nature of the intervention, the setting, the evaluation context and the decision-making context), and identifies four dimensions of volunteer tourism (stakeholders, organisations, markets...

  3. Groundwater protection plan for the Environmental Restoration Disposal Facility

    International Nuclear Information System (INIS)

    Weekes, D.C.; Jaeger, G.K.; McMahon, W.J.; Ford, B.H.

    1996-01-01

    This document is the groundwater protection plan for the Environmental Restoration Disposal Facility (ERDF) Project. This plan is prepared based on the assumption that the ERDF will receive waste containing hazardous/dangerous constituents, radioactive constituents, and combinations of both. The purpose of this plan is to establish a groundwater monitoring program that (1) meets the intent of the applicable or relevant and appropriate requirements, (2) documents baseline groundwater conditions, (3) monitors those conditions for change, and (4) allows for modifications to groundwater sampling if required by the leachate management program. Groundwater samples indicate the occurrence of preexisting groundwater contamination in the uppermost unconfined aquifer below the ERDF Project site, as a result of past waste-water discharges in the 200 West Area. Therefore, it is necessary for the ERDF to establish baseline groundwater quality conditions and to monitor changes in the baseline over time. The groundwater monitoring program presented in this plan will provide the means to assess onsite and offsite impacts to the groundwater. In addition, a separate leachate management program will provide an indication of whether the liners are performing within design standards

  4. Monitoring man's impact in the coastal zone

    International Nuclear Information System (INIS)

    Benton, A.R. Jr.; Snell, W.W.

    1979-01-01

    The paper examines the monitoring of man's impact in the coastal zone. Color infrared photography shows destroyed or degraded wetlands or beaches, and makes possible relevant linear or aerial measurements with aerial photography. It can also categorize the environmental impacts which have accrued as the result of completion of water development projects. Aerial photography of the Texas coastal zone illustrates the nature and degree of damage likely to occur as a result of construction or maintenance projects. It is concluded that the method of assigning realistic values to unit areas of wetlands and beaches will make it feasible to incorporate the cost of estuarine damages into the cost estimates of water development schemes

  5. Waste heat discharges in the aquatic environment -- impact and monitoring 2

    International Nuclear Information System (INIS)

    Kamath, P.R.

    1980-01-01

    Studies on ecological impacts, on fishes in particular, of waste heat discharges in the aquatic environment are briefly reviewed. These studies cover the susceptibility of fishes to disease and predation, population biology, parasite proliferation and its impact on fishes, synergistic effects due to heat and other stresses such as chemicals, pollutant, lowering of saturation limit of dissolved oxygen at elevated temperature and radioactivity. Experiences of monitoring waste heat discharges at the Rajasthan Atomic Power Station (RAPS) and the Tarapur Atomic Power Station (TAPS) are presented. Entrainment losses and impingement losses are also reviewed. Requirements for thermal monitoring are mentioned. (M.G.B.)

  6. Project No. 8 - Final decommissioning plan

    International Nuclear Information System (INIS)

    2000-01-01

    Ignalina NPP should prepare the final Ignalina NPP unit 1 decommissioning plan by march 31, 2002. This plan should include the following : description of Ignalina NPP and the Ignalina NPP boundary that could be influenced by decommissioning process; decommissioning strategy selected and a logical substantiation for this selection; description of the decommissioning actions suggested and a time schedule for the actions to be performed; conceptual safety and environmental impact assessment covering ionizing radiation and other man and environment impact; description of the environmental monitoring program proposed during decommissioning process; description of the waste management proposed; assessment of decommissioning expenses including waste management, accumulated funds and other sources. Estimated project cost - 0.75 M EURO

  7. Intra-hole fluid convection: High-resolution temperature monitoring

    Czech Academy of Sciences Publication Activity Database

    Čermák, Vladimír; Šafanda, Jan; Krešl, Milan

    2008-01-01

    Roč. 348, č. 3-4 (2008), s. 464-479 ISSN 0022-1694 Institutional research plan: CEZ:AV0Z30120515 Keywords : temperature monitoring * convection * fluid dynamics * borehole logging Subject RIV: DC - Siesmology, Volcanology, Earth Structure Impact factor: 2.305, year: 2008

  8. Long-term genetic monitoring of a riverine dragonfly, Orthetrum coerulescens (Odonata: Libellulidae]: Direct anthropogenic impact versus climate change effects.

    Science.gov (United States)

    Herzog, Rebecca; Hadrys, Heike

    2017-01-01

    Modern conservationists call for long term genetic monitoring datasets to evaluate and understand the impact of human activities on natural ecosystems and species on a global but also local scale. However, long-term monitoring datasets are still rare but in high demand to correctly identify, evaluate and respond to environmental changes. In the presented study, a population of the riverine dragonfly, Orthetrum coerulescens (Odonata: Libellulidae), was monitored over a time period from 1989 to 2013. Study site was an artificial irrigation ditch in one of the last European stone steppes and "nature heritage", the Crau in Southern France. This artificial riverine habitat has an unusual high diversity of odonate species, prominent indicators for evaluating freshwater habitats. A clearing of the canal and destruction of the bank vegetation in 1996 was assumed to have great negative impact on the odonate larval and adult populations. Two mitochondrial markers (CO1 & ND1) and a panel of nuclear microsatellite loci were used to assess the genetic diversity. Over time they revealed a dramatic decline in diversity parameters between the years 2004 and 2007, however not between 1996 and 1997. From 2007 onwards the population shows a stabilizing trend but has not reached the amount of genetic variation found at the beginning of this survey. This decline cannot be referred to the clearing of the canal or any other direct anthropogenic impact. Instead, it is most likely that the populations' decay was due to by extreme weather conditions during the specific years. A severe drought was recorded for the summer months of these years, leading to reduced water levels in the canal causing also other water parameters to change, and therefore impacting temperature sensitive riverine habitat specialists like the O. coerulescens in a significant way. The data provide important insights into population genetic dynamics and metrics not always congruent with traditional monitoring data (e

  9. Carers' perceptions of the impact of home telehealth monitoring on the provision of care and sustainability of use.

    Science.gov (United States)

    Wade, Rachael; Cartwright, Colleen; Shaw, Kelly

    2015-06-01

    This paper aims to report carers' perceptions of the impact of home telehealth on the provision of care and the sustainability of home telehealth use. This paper is reporting on a sample of 15 carers who were involved in the telehealth arm of a larger controlled trial. Carers primarily believed that telehealth helped to provide better care. None of the carers had organised, or planned to organise, ongoing telehealth monitoring beyond the study. The main reason given for non-sustained usage was the belief that the person they cared for no longer required, or would benefit from, the monitoring. As the person being cared for was a frail older person with multiple chronic diseases and a history of recent hospitalisation, the non-sustained usage of home telehealth by carers raises questions about what is needed to ensure sustainability of use; this requires further investigation. © 2014 AJA Inc.

  10. Assessing the health equity impacts of regional land-use plan making: An equity focussed health impact assessment of alternative patterns of development of the Whitsunday Hinterland and Mackay Regional Plan, Australia (Short report)

    International Nuclear Information System (INIS)

    Gunning, Colleen; Harris, Patrick; Mallett, John

    2011-01-01

    Health service and partners completed an equity focussed health impact assessment to influence the consideration of health and equity within regional land-use planning in Queensland, Australia. This project demonstrated how an equity oriented assessment matrix can assist in testing regional planning scenarios. It is hoped that this HIA will contribute to the emerging interest in ensuring that potential differential health impacts continue to be considered as part of land-use planning processes.

  11. Evaluation of Haddam Neck (Connecticut Yankee) Nuclear Power Plant, environmental impact prediction, based on monitoring programs

    International Nuclear Information System (INIS)

    Gore, K.L.; Thomas, J.M.; Kannberg, L.D.; Mahaffey, J.A.; Waton, D.G.

    1976-12-01

    A study was undertaken by the U.S. Nuclear Regulatory Commission (NRC) to evaluate the nonradiological environmental data obtained from three nuclear power plants operating for a period of one year or longer. The document presented reports the second of three nuclear power plants to be evaluated in detail by Battelle, Pacific Northwest Laboratories. Haddam Neck (Connecticut Yankee) Nuclear Power Plant nonradiological monitoring data were assessed to determine their effectiveness in the measurement of environmental impacts. Efforts were made to determine if: (1) monitoring programs, as designed, can detect environmental impacts, (2) appropriate statistical analyses were performed and if they were sensitive enough to detect impacts, (3) predicted impacts could be verified by monitoring programs, and (4) monitoring programs satisfied the requirements of the Environmental Technical Specifications. Both preoperational and operational monitoring data were examined to test the usefulness of baseline information in evaluating impacts. This included an examination of the methods used to measure ecological, chemical, and physical parameters, and an assessment of sampling periodicity and sensitivity where appropriate data sets were available. From this type of analysis, deficiencies in both preoperational and operational monitoring programs may be identified and provide a basis for suggested improvement

  12. 76 FR 24050 - Coral Reef Restoration Plan, Final Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF THE INTERIOR National Park Service [2310-0003-422] Coral Reef Restoration Plan... for the Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National... availability of a Final Programmatic Environmental Impact Statement for the Coral Reef Restoration Plan (Plan...

  13. Kenya's health workforce information system: a model of impact on strategic human resources policy, planning and management.

    Science.gov (United States)

    Waters, Keith P; Zuber, Alexandra; Willy, Rankesh M; Kiriinya, Rose N; Waudo, Agnes N; Oluoch, Tom; Kimani, Francis M; Riley, Patricia L

    2013-09-01

    Countries worldwide are challenged by health worker shortages, skill mix imbalances, and maldistribution. Human resources information systems (HRIS) are used to monitor and address these health workforce issues, but global understanding of such systems is minimal and baseline information regarding their scope and capability is practically non-existent. The Kenya Health Workforce Information System (KHWIS) has been identified as a promising example of a functioning HRIS. The objective of this paper is to document the impact of KHWIS data on human resources policy, planning and management. Sources for this study included semi-structured interviews with senior officials at Kenya's Ministry of Medical Services (MOMS), Ministry of Public Health and Sanitation (MOPHS), the Department of Nursing within MOMS, the Nursing Council of Kenya, Kenya Medical Practitioners and Dentists Board, Kenya's Clinical Officers Council, and Kenya Medical Laboratory Technicians and Technologists Board. Additionally, quantitative data were extracted from KHWIS databases to supplement the interviews. Health sector policy documents were retrieved from MOMS and MOPHS websites, and reviewed to assess whether they documented any changes to policy and practice as having been impacted by KHWIS data. Interviews with Kenyan government and regulatory officials cited health workforce data provided by KHWIS influenced policy, regulation, and management. Policy changes include extension of Kenya's age of mandatory civil service retirement from 55 to 60 years. Data retrieved from KHWIS document increased relicensing of professional nurses, midwives, medical practitioners and dentists, and interviewees reported this improved compliance raised professional regulatory body revenues. The review of Government records revealed few references to KHWIS; however, documentation specifically cited the KHWIS as having improved the availability of human resources for health information regarding workforce planning

  14. Adaptation of EVIAVE methodology for monitoring and follow-up when evaluating the environmental impact of landfills

    International Nuclear Information System (INIS)

    Arrieta, Gabriela; Requena, Ignacio; Toro, Javier; Zamorano, Montserrat

    2016-01-01

    Treatment and final disposal of Municipal Solid Waste can have a significant role in the generation of negative environmental impacts. As a prevention strategy, such activities are subjected to the process of Environmental Impact Assessment (EIA). Still, the follow-up of Environmental Management Plans or mitigation measures is limited, for one due to a lack of methodological approaches. In searching for possibilities, the University of Granada (Spain) developed a diagnostic methodology named EVIAVE, which allows one to quantify, by means of indexes, the environmental impact of landfills in view of their location and the conditions of exploitation. EVIAVE is applicable within the legal framework of the European Union and can be adapted to the environmental and legal conditions of other countries. This study entails its adaptation in Colombia, for the follow-up and control of the EIA process for landfills. Modifications involved inclusion of the environmental elements flora and fauna, and the evaluation of the environmental descriptors in agreement with the concept of vulnerability. The application of the modified EVIAVE in Colombian landfills allowed us to identify the elements affected by the operating conditions and maintenance. It may be concluded that this methodology is viable and effective for the follow-up and environmental control of EIA processes for landfills, and to analyze the associated risks, as it takes into account related environmental threats and vulnerabilities. - Highlights: • A modified methodology is used to monitor and follow-up environmental impacts in landfills. • The improved methodology includes the Vulnerability of Flora and Fauna to evaluate environmental impact of landfills. • The methodology serves to identify and evaluate the sources of risk generated in the construction and siting of landfills. • Environmental vulnerability indicators improve effectiveness of the control and follow-up phases of landfill management. • The

  15. Adaptation of EVIAVE methodology for monitoring and follow-up when evaluating the environmental impact of landfills

    Energy Technology Data Exchange (ETDEWEB)

    Arrieta, Gabriela, E-mail: tonina1903@hotmail.com [Department of Civil Engineering, University of Granada (Spain); Requena, Ignacio, E-mail: requena@decsai.ugr.es [Department of Computer Science and Artificial Intelligence, University of Granada (Spain); Toro, Javier, E-mail: jjtoroca@unal.edu.co [Universidad Nacional de Colombia — Sede Bogotá, Instituto de Estudios Ambientales (Colombia); Zamorano, Montserrat, E-mail: zamorano@ugr.es [Department of Civil Engineering, University of Granada (Spain)

    2016-01-15

    Treatment and final disposal of Municipal Solid Waste can have a significant role in the generation of negative environmental impacts. As a prevention strategy, such activities are subjected to the process of Environmental Impact Assessment (EIA). Still, the follow-up of Environmental Management Plans or mitigation measures is limited, for one due to a lack of methodological approaches. In searching for possibilities, the University of Granada (Spain) developed a diagnostic methodology named EVIAVE, which allows one to quantify, by means of indexes, the environmental impact of landfills in view of their location and the conditions of exploitation. EVIAVE is applicable within the legal framework of the European Union and can be adapted to the environmental and legal conditions of other countries. This study entails its adaptation in Colombia, for the follow-up and control of the EIA process for landfills. Modifications involved inclusion of the environmental elements flora and fauna, and the evaluation of the environmental descriptors in agreement with the concept of vulnerability. The application of the modified EVIAVE in Colombian landfills allowed us to identify the elements affected by the operating conditions and maintenance. It may be concluded that this methodology is viable and effective for the follow-up and environmental control of EIA processes for landfills, and to analyze the associated risks, as it takes into account related environmental threats and vulnerabilities. - Highlights: • A modified methodology is used to monitor and follow-up environmental impacts in landfills. • The improved methodology includes the Vulnerability of Flora and Fauna to evaluate environmental impact of landfills. • The methodology serves to identify and evaluate the sources of risk generated in the construction and siting of landfills. • Environmental vulnerability indicators improve effectiveness of the control and follow-up phases of landfill management. • The

  16. Performance Assessment Monitoring Plan for the Hanford Site Low-Level Waste Burial Grounds

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    2000-01-01

    As directed by the U.S. Department of Energy (DOE), Richland Operations Office (DOE-RL), Fluor Hanford, Inc. will implement the requirements of DOE Order 435.1, Radioactive Waste Management, as the requirements relate to the continued operation of the low-level waste disposal facilities on the Hanford Site. DOE Order 435.1 requires a disposal authorization statement authorizing operation (or continued operation) of a low-level waste disposal facility. The objective of this Order is to ensure that all DOE radioactive waste is managed in a manner that protects the environment and personnel and public health and safety. The manual (DOE Order 435.1 Manual) implementing the Order states that a disposal authorization statement shall be issued based on a review of the facility's performance assessment and composite analysis or appropriate Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) of 1980 documentation. The disposal authorization shall specify the limits and conditions on construction, design, operations, and closure of the low-level waste facility. Failure to obtain a disposal authorization statement shall result in shutdown of an operational disposal facility. In fulfillment of the requirements of DOE Order 435.1, a disposal authorization statement was issued on October 25, 1999, authorizing the Hanford Site to transfer, receive, possess, and dispose of low-level radioactive waste at the 200 East Area and the 200 West Area Low-Level Burial Grounds. The disposal authorization statement constitutes approval of the performance assessment and composite analysis, authorizes operation of the facility, and includes conditions that the disposal facility must meet. One of the conditions is that monitoring plans for the 200 East Area and 200 West Area Low-Level Burial Grounds be written and approved by the DOE-RL. The monitoring plan is to be updated and implemented within 1 year following issuance of the disposal authorization statement to

  17. Integrated Closure and Monitoring Plan for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada Test Site

    International Nuclear Information System (INIS)

    Bechtel Nevada

    2005-01-01

    This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site. This document is an integrated plan for closing and monitoring two low-level radioactive waste disposal sites at the Nevada Test Site (NTS). The Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) are managed and operated by Bechtel Nevada (BN) for the U.S. Department of Energy's (DOE's) National Nuclear Security Administration Nevada Site Office (NNSA/NSO). The Integrated Closure and Monitoring Plan (ICMP) for these sites is based on guidance for developing closure plans issued by the DOE (DOE, 1999a). The plan does not closely follow the format suggested by the DOE guidance to better accommodate differences between the two RWMSs, especially in terms of operations and site characteristics. The modification reduces redundancy and provides a smoother progression of the discussion. Further, much of the information that would be included in the individual plans is the same, and integration provides efficient presentation. A cross-walk between the contents of the ICMP and the DOE guidance is given in Appendix A. Closure and monitoring were integrated because monitoring measures the degree to which the operational and closed disposal facilities are meeting performance objectives specified in the manual to DOE Order O 435.1. Department of Energy Order 435.1 governs management of radioactive waste, and associated with it are Manual DOE M 435.1-1 and Guidance DOE G 435.1-1. The performance objectives are intended to ensure protection of workers, the public, and the environment from radiological exposure associated with the RWMSs now and in the future

  18. Environmental auditing: Capabilities and management utility of recreation impact monitoring programs

    Science.gov (United States)

    Marion, J.L.

    1995-01-01

    A recreation impact monitoring system was developed and applied in 1984?1986 and in 1991 to all backcountry river-accessed campsites within Delaware Water Gap National Recreation Area, Pennsylvania and New Jersey. Results suggest that actions implemented by park managers in response to problems identified by the initial survey were highly effective in reducing resource degradation caused by camping. In particular, the elimination of some designated campsites and installation of anchored firegrates reduced the total area of disturbance by 50%. Firegrate installation provided a focal point that increased the concentration of camping activities, allowing peripheral areas to recover. As suggested by predictive models, additional resource degradation caused by increased camping intensities is more than offset by improvements in the condition of areas where use is eliminated. The capabilities and management utility of recreation impact monitoring programs, illustrated by the Delaware Water Gap monitoring program, are also presented and discussed.

  19. Monitoring the impacts of Ocean Acidification on coral reef bioerosion: challenges, methods, recommendations

    Science.gov (United States)

    Enochs, I.; Manzello, D.; Carlton, R.

    2013-05-01

    Coral reef habitats exist as a dynamic balance between the additive process of calcification and the destructive effects of erosion. A disruption to either the positive or negative side of the coral reef carbonate budget can push a reef system towards rapid collapse. It is well understood that Ocean Acidification (OA) may impair calcification and emerging experimental evidence suggests that it will likely increase the erosive potential of a diverse suite of bioeroding taxa. This may lead to previously unforeseen scenarios where reef framework degradation occurs at a faster pace than that predicted by more simplistic models, resulting from the multifaceted impacts of both slower coral growth and enhanced rates of habitat erosion. As such, it is of paramount importance that monitoring plans tasked with assessing reef resilience to climate change and OA incorporate methods for quantifying bioerosion. This is a complex undertaking as reef ecosystem bioerosion is the result of numerous behaviors, employed by diverse flora and fauna, operating at vastly different scales. Furthermore, these erosive processes are highly variable, dependent on seasonal fluctuations and differing between reef regions, species, individuals, and even the physical characteristics of the substrates acted upon. The strengths and weaknesses of existing bioerosion monitoring methodologies are discussed, ranging from quantification of single species erosion rates to multi-phyletic census-based approaches. Traditional techniques involving the weight change of carbonate blocks are compared alongside more modern methodologies such as micro computed tomography. Finally, recommendations are made for a comprehensive monitoring strategy, incorporating multiple methodologies in a time and cost-effective manner.

  20. Personnel reliability impact on petrochemical facilities monitoring system's failure skipping probability

    Science.gov (United States)

    Kostyukov, V. N.; Naumenko, A. P.

    2017-08-01

    The paper dwells upon urgent issues of evaluating impact of actions conducted by complex technological systems operators on their safe operation considering application of condition monitoring systems for elements and sub-systems of petrochemical production facilities. The main task for the research is to distinguish factors and criteria of monitoring system properties description, which would allow to evaluate impact of errors made by personnel on operation of real-time condition monitoring and diagnostic systems for machinery of petrochemical facilities, and find and objective criteria for monitoring system class, considering a human factor. On the basis of real-time condition monitoring concepts of sudden failure skipping risk, static and dynamic error, monitoring systems, one may solve a task of evaluation of impact that personnel's qualification has on monitoring system operation in terms of error in personnel or operators' actions while receiving information from monitoring systems and operating a technological system. Operator is considered as a part of the technological system. Although, personnel's behavior is usually a combination of the following parameters: input signal - information perceiving, reaction - decision making, response - decision implementing. Based on several researches on behavior of nuclear powers station operators in USA, Italy and other countries, as well as on researches conducted by Russian scientists, required data on operator's reliability were selected for analysis of operator's behavior at technological facilities diagnostics and monitoring systems. The calculations revealed that for the monitoring system selected as an example, the failure skipping risk for the set values of static (less than 0.01) and dynamic (less than 0.001) errors considering all related factors of data on reliability of information perception, decision-making, and reaction fulfilled is 0.037, in case when all the facilities and error probability are under

  1. Environmental program planning for the proposed high-level nuclear waste repository at Yucca Mountain, Nevada: Volume 1

    International Nuclear Information System (INIS)

    1987-08-01

    Environmental protection during the course of siting and constructing a repository is mandated by NWPA in conjunction with various phases of repository siting and development. However, DOE has issued no comprehensive, integrated plan for environmental protection. Consequently, it is unclear how DOE will accomplish environmental assessment, monitoring, impact mitigation, and site reclamation. DOE should, therefore, defer further implementation of its current characterization program until a comprehensive environmental protection plan is available. To fulfill its oversight responsibilities the State of Nevada has proposed a comprehensive environmental program for the Yucca Mountain site that includes immediately undertaking studies to establish a 12-month baseline of environmental information at the site; adopting the DOE Site Characterization Plan (SCP) and the engineering design plans it will contain as the basis for defining the impact potential of site characterization activities; using the environmental baseline and the SCP to evaluate the efficacy of the preliminary impact analyses reported by DOE in the EA; using the SCP as the basis for discussions with federal, state, and local regulatory authorities to decide which environmental requirements apply and how they can be complied with; using the SCP, the EA impact review, and the compliance requirements to determine the scope of reclamation measures needed; and developing environmental monitoring and impact mitigation plans based on the EA impact review, compliance requirements, and anticipated reclamation needs

  2. Liquid Effluent Monitoring Information System test plans releases 2.0 and 3.0

    International Nuclear Information System (INIS)

    Guettler, D.A.

    1995-01-01

    The Liquid Effluent Monitoring Information System (LEMIS) is being developed as the organized information repository facility in support of the liquid effluent monitoring requirements of the Tri-Party Agreement. It is necessary to provide an automated repository into which the results from liquid effluent sampling will be placed. This repository must provide for effective retention, review, and retrieval of selected sample data by authorized persons and organizations. This System Architecture document is the aggregation of the DMR P+ methodology project management deliverables. Together they represent a description of the project and its plan through four Releases, corresponding to the definition and prioritization of requirements defined by the user

  3. 75 FR 21650 - Coral Reef Restoration Plan, Draft Programmatic Environmental Impact Statement, Biscayne National...

    Science.gov (United States)

    2010-04-26

    ... DEPARTMENT OF THE INTERIOR National Park Service Coral Reef Restoration Plan, Draft Programmatic... Coral Reef Restoration Plan, Biscayne National Park. SUMMARY: Pursuant to the National Environmental... availability of a Draft Programmatic Environmental Impact Statement (DEIS) for the Coral Reef Restoration Plan...

  4. Experimental Study on Stress Monitoring of Sand-Filled Steel Tube during Impact Using Piezoceramic Smart Aggregates.

    Science.gov (United States)

    Du, Guofeng; Zhang, Juan; Zhang, Jicheng; Song, Gangbing

    2017-08-22

    The filling of thin-walled steel tubes with quartz sand can help to prevent the premature buckling of the steel tube at a low cost. During an impact, the internal stress of the quartz sand-filled steel tube column is subjected to not only axial force but also lateral confining force, resulting in complicated internal stress. A suitable sensor for monitoring the internal stress of such a structure under an impact is important for structural health monitoring. In this paper, piezoceramic Smart Aggregates (SAs) are embedded into a quartz Sand-Filled Steel Tube Column (SFSTC) to monitor the internal structural stress during impacts. The piezoceramic smart aggregates are first calibrated by an impact hammer. Tests are conducted to study the feasibility of monitoring the internal stress of a structure. The results reflect that the calibration value of the piezoceramic smart aggregate sensitivity test is in good agreement with the theoretical value, and the output voltage value of the piezoceramic smart aggregate has a good linear relationship with external forces. Impact tests are conducted on the sand-filled steel tube with embedded piezoceramic smart aggregates. By analyzing the output signal of the piezoceramic smart aggregates, the internal stress state of the structure can be obtained. Experimental results demonstrated that, under the action of impact loads, the piezoceramic smart aggregates monitor the compressive stress at different locations in the steel tube, which verifies the feasibility of using piezoceramic smart aggregate to monitor the internal stress of a structure.

  5. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources.

  6. Seeps and springs sampling and analysis plan for the environmental monitoring plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-08-01

    This Sampling and Analysis Plan addresses the monitoring, sampling, and analysis activities that will be conducted at seeps and springs and at two french drain outlets in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-land-burial disposal facility for low-level radioactive waste at Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and operated by Martin Marietta Energy Systems, Inc. Initially, sampling will be conducted at as many as 15 locations within WAG 6 (as many as 13 seeps and 2 french drain outlets). After evaluating the results obtained and reviewing the observations made by field personnel during the first round of sampling, several seeps and springs will be chosen as permanent monitoring points, together with the two french drain outlets. Baseline sampling of these points will then be conducted quarterly for 1 year (i.e., four rounds of sampling after the initial round). The samples will be analyzed for various geochemical, organic, inorganic, and radiological parameters. Permanent sampling points having suitable flow rates and conditions may be outfitted with automatic flow-monitoring equipment. The results of the sampling and flow-monitoring efforts will help to quantify flux moving across the ungauged perimeter of the site and will help to identify changes in releases from the contaminant sources

  7. Preliminary site characterization radiological monitoring plan for the Nevada Nuclear Waste Storage Investigations Project, Yucca Mountain Site

    International Nuclear Information System (INIS)

    1987-03-01

    The activities described in this plan occur in the early phases of site characterization. This document presents the Preliminary Site Characterization Radiological Monitoring Plan (PSCRMP) for collecting and evaluating data in support of the NNWSI Project. The PSCRMP defines and identifies control procedures for the monitoring activities. The PSCRMP activity will utilize integrating radon monitoring devices, a continuous radon monitor, and a particulate air sampler. These instruments will be used to establish the baseline radioactivity and/or radioactivity released due to early site characterization activities. The sections that follow provide a general project description, the specifics of the monitoring program, and the practices that will be employed to ensure the validity of the collected data by integrating quality assurance into all activities. Section 2 of this document describes the regulatory base of this document. Section 3 describes the site characterization activities which may lead to release of radioactivity. Section 4 provides a description of the potential sources of radioactivity that site characterization could generate. Section 5 summarizes the sampling and monitoring methodology, which will be used to monitor the potential sources of radioactivity. The network of sampling and monitoring equipment is described in Section 6, and Section 7 summarizes the systems operation activities. The data reporting activities are described in Section 8. Finally, a description of the Quality Assurance (QA) and Quality Control (QC) activities is provided in Section 9. Appendix A contains a summary of the procedures to be used in this program, and Appendix B contains technical specification on equipment and services. 20 refs., 11 figs., 2 tabs

  8. Addendum to environmental monitoring plan Nevada Test Site and support facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    This 1992 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/1 0630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Field Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1992 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  9. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities

    International Nuclear Information System (INIS)

    1993-11-01

    This 1993 Addendum to the ''Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,'' Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy's (DOE's) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards

  10. Hanford Environmental Management Program implementation plan

    International Nuclear Information System (INIS)

    1988-08-01

    The Hanford Environmental Management Program (HEMP) was established to facilitate compliance with the applicable environmental statues, regulations, and standards on the Hanford Site. The HEMP provides a structured approach to achieve environmental management objectives. The Hanford Environmental Management Program Plan (HEMP Plan) was prepared as a strategic level planning document to describe the program management, technical implementation, verification, and communications activities that guide the HEMP. Four basic program objectives are identified in the HEMP Plan as follows: establish ongoing monitoring to ensure that Hanford Site operations comply with environmental requirements; attain regulatory compliance through the modification of activities; mitigate any environmental consequences; and minimize the environmental impacts of future operations at the Hanford Site. 2 refs., 24 figs., 27 tabs

  11. Radiation monitoring methodologies and their applications at BARC site

    International Nuclear Information System (INIS)

    Divkar, J.K.; Chatterjee, M.K.; Patra, R.P; Morali, S.; Singh, Rajvir

    2016-01-01

    Radiation monitoring methodology can be planned for various objectives during normal as well as emergency situations. During radiological emergency, radiation monitoring data provides useful information required for management of the abnormal situation. In order to assess the possible consequences accurately and to implement adequate measure, the emergency management authorities should have a well-prepared monitoring strategy in readiness. Fixed monitoring method is useful to analyze the behavior of nuclear plant site and to develop holistic model for it mobile monitoring is useful for quick impact assessment and will be the backbone of emergency response, particularly in case of non availability of fixed monitoring system caused due to natural disaster like floods, earthquake and tsunami

  12. 78 FR 55093 - Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation...

    Science.gov (United States)

    2013-09-09

    ....YP0000] Dog Management Plan, Supplemental Environmental Impact Statement, Golden Gate National Recreation... the Dog Management Plan (Plan/SEIS), Golden Gate National Recreation Area (GGNRA), California. Current dog management in the park is based on a number of factors. Areas included in the GGNRA Citizens...

  13. Environmental impacts during geothermal development: Some examples from Central America

    International Nuclear Information System (INIS)

    Goff, S.; Goff, F.

    1997-01-01

    The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development

  14. Monitoring the impacts of trade agreements on food environments.

    Science.gov (United States)

    Friel, S; Hattersley, L; Snowdon, W; Thow, A-M; Lobstein, T; Sanders, D; Barquera, S; Mohan, S; Hawkes, C; Kelly, B; Kumanyika, S; L'Abbe, M; Lee, A; Ma, J; Macmullan, J; Monteiro, C; Neal, B; Rayner, M; Sacks, G; Swinburn, B; Vandevijvere, S; Walker, C

    2013-10-01

    The liberalization of international trade and foreign direct investment through multilateral, regional and bilateral agreements has had profound implications for the structure and nature of food systems, and therefore, for the availability, nutritional quality, accessibility, price and promotion of foods in different locations. Public health attention has only relatively recently turned to the links between trade and investment agreements, diets and health, and there is currently no systematic monitoring of this area. This paper reviews the available evidence on the links between trade agreements, food environments and diets from an obesity and non-communicable disease (NCD) perspective. Based on the key issues identified through the review, the paper outlines an approach for monitoring the potential impact of trade agreements on food environments and obesity/NCD risks. The proposed monitoring approach encompasses a set of guiding principles, recommended procedures for data collection and analysis, and quantifiable 'minimal', 'expanded' and 'optimal' measurement indicators to be tailored to national priorities, capacity and resources. Formal risk assessment processes of existing and evolving trade and investment agreements, which focus on their impacts on food environments will help inform the development of healthy trade policy, strengthen domestic nutrition and health policy space and ultimately protect population nutrition. © 2013 The Authors. Obesity Reviews published by John Wiley & Sons Ltd on behalf of the International Association for the Study of Obesity.

  15. Vision 20/20: Positron emission tomography in radiation therapy planning, delivery, and monitoring

    Energy Technology Data Exchange (ETDEWEB)

    Parodi, Katia, E-mail: Katia.parodi@physik.uni-muenchen.de [Faculty of Physics, Department of Medical Physics, Ludwig Maximilians University Munich, Munich 85748 (Germany)

    2015-12-15

    Positron emission tomography (PET) is increasingly considered as an effective imaging method to support several stages of radiation therapy. The combined usage of functional and morphological imaging in state-of-the-art PET/CT scanners is rapidly emerging to support the treatment planning process in terms of improved tumor delineation, and to assess the tumor response in follow-up investigations after or even during the course of fractionated therapy. Moreover, active research is being pursued on new tracers capable of providing different insights into tumor function, in order to identify areas of the planning volume which may require additional dosage for improved probability of tumor control. In this respect, major progresses in the next years will likely concern the development and clinical investigation of novel tracers and image processing techniques for reliable thresholding and segmentation, of treatment planning and beam delivery approaches integrating the PET imaging information, as well as improved multimodal clinical instrumentation such as PET/MR. But especially in the rapidly emerging case of ion beam therapy, the usage of PET is not only limited to the imaging of external tracers injected to the patient. In fact, a minor amount of positron emitters is formed in nuclear fragmentation reactions between the impinging ions and the tissue, bearing useful information for confirmation of the delivered treatment during or after therapeutic irradiation. Different implementations of unconventional PET imaging for therapy monitoring are currently being investigated clinically, and major ongoing research aims at new dedicated detector technologies and at challenging applications such as real-time imaging and time-resolved in vivo verification of motion compensated beam delivery. This paper provides an overview of the different areas of application of PET in radiation oncology and discusses the most promising perspectives in the years to come for radiation therapy

  16. Vision 20/20: Positron emission tomography in radiation therapy planning, delivery, and monitoring

    International Nuclear Information System (INIS)

    Parodi, Katia

    2015-01-01

    Positron emission tomography (PET) is increasingly considered as an effective imaging method to support several stages of radiation therapy. The combined usage of functional and morphological imaging in state-of-the-art PET/CT scanners is rapidly emerging to support the treatment planning process in terms of improved tumor delineation, and to assess the tumor response in follow-up investigations after or even during the course of fractionated therapy. Moreover, active research is being pursued on new tracers capable of providing different insights into tumor function, in order to identify areas of the planning volume which may require additional dosage for improved probability of tumor control. In this respect, major progresses in the next years will likely concern the development and clinical investigation of novel tracers and image processing techniques for reliable thresholding and segmentation, of treatment planning and beam delivery approaches integrating the PET imaging information, as well as improved multimodal clinical instrumentation such as PET/MR. But especially in the rapidly emerging case of ion beam therapy, the usage of PET is not only limited to the imaging of external tracers injected to the patient. In fact, a minor amount of positron emitters is formed in nuclear fragmentation reactions between the impinging ions and the tissue, bearing useful information for confirmation of the delivered treatment during or after therapeutic irradiation. Different implementations of unconventional PET imaging for therapy monitoring are currently being investigated clinically, and major ongoing research aims at new dedicated detector technologies and at challenging applications such as real-time imaging and time-resolved in vivo verification of motion compensated beam delivery. This paper provides an overview of the different areas of application of PET in radiation oncology and discusses the most promising perspectives in the years to come for radiation therapy

  17. 76 FR 70483 - Environmental Impact Statement and General Management Plan, Paterson Great Falls National...

    Science.gov (United States)

    2011-11-14

    ... planning process and will remain actively involved throughout the development of the plan. Prepared by... the long-term management of Paterson Great Falls NHP early in the process through public meetings and... Impact Statement and General Management Plan, Paterson Great Falls National Historical Park, NJ AGENCY...

  18. 76 FR 3652 - Dog Management Plan/Environmental Impact Statement, Golden Gate National Recreation Area, California

    Science.gov (United States)

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR National Park Service [8145-8B90-SZM] Dog Management Plan/Environmental...: Notice of Availability of a Draft Environmental Impact Statement for the Dog Management Plan, Golden Gate... the Dog Management Plan (Draft Plan/EIS), Golden Gate National Recreation Area (GGNRA), California...

  19. 76 FR 75556 - Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact...

    Science.gov (United States)

    2011-12-02

    ...] Notice of Availability of the Proposed Resource Management Plan and Final Environmental Impact Statement for the Taos Field Office, New Mexico AGENCY: Bureau of Land Management, Interior. ACTION: Notice of...) has prepared the Proposed Resource Management Plan/Final Environmental Impact Statement (Proposed RMP...

  20. 40 CFR 141.601 - Standard monitoring.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Standard monitoring. 141.601 Section... Standard monitoring. (a) Standard monitoring plan. Your standard monitoring plan must comply with paragraphs (a)(1) through (a)(4) of this section. You must prepare and submit your standard monitoring plan...

  1. Review of Offshore Wind Farm Impact Monitoring and Mitigation with Regard to Marine Mammals.

    Science.gov (United States)

    Verfuss, Ursula K; Sparling, Carol E; Arnot, Charlie; Judd, Adrian; Coyle, Michael

    2016-01-01

    Monitoring and mitigation reports from 19 UK and 9 other European Union (EU) offshore wind farm (OWF) developments were reviewed, providing a synthesis of the evidence associated with the observed environmental impact on marine mammals. UK licensing conditions were largely concerned with mitigation measures reducing the risk of physical and auditory injury from pile driving. At the other EU sites, impact monitoring was conducted along with mitigation measures. Noise-mitigation measures were developed and tested in UK and German waters in German government-financed projects. We highlight some of the review's findings and lessons learned with regard to noise impact on marine mammals.

  2. Environmental and Social Impact Study: Final Report

    International Nuclear Information System (INIS)

    2011-04-01

    The tsetse control project (commonly known as tsetse flies) is an initiative of the Directorate of Livestock (project coordinating institution) and the ISRA (Senegalese Agricultural Research Institute) Accompaniment and diagnosis of the project. It is part of the cooperation between Senegal and the International Atomic Energy Agency (IAEA).The method of control that will be applied is the technique of sterile males.This technique of sterile males, however, is coupled with the use of deltamethrin (D6), a neurotoxic chemical (in adult insects) that is fast and fairly rapidly biodegradable in the environment.This study is carried out with the aim of taking good account of the environmental impacts of the various activities envisaged by the project. Its objective is to assess the biophysical, social and economic impacts of the project and to propose measures to mitigate or compensate for negative impacts and to reinforce positive impacts within the framework of an Environmental Management Plan and (ESMP). It also presents an environmental and social monitoring and monitoring plan to assess the effectiveness of the proposed mitigation measures.

  3. 78 FR 67187 - Notice of Availability of the Draft General Management Plan/Wilderness Study/Environmental Impact...

    Science.gov (United States)

    2013-11-08

    ... focus on protecting natural resources and systems. Under this alternative, most of the Big Spring... Availability of the Draft General Management Plan/ Wilderness Study/Environmental Impact Statement for the... Management Plan/Wilderness Study/Environmental Impact Statement (GMP/WS/EIS) for the Ozark National Scenic...

  4. Circumpolar Biodiversity Monitoring Programme coastal biodiversity monitoring background paper

    Science.gov (United States)

    McLennan, Donald; Anderson, Rebecca D.; Wegeberg, S.; Pettersvik Arvnes, Maria; Sergienko, Liudmila; Behe, Carolina; Moss-Davies, Pitseolak; Fritz, S.; Markon, Carl J.; Christensen, T.; Barry, T.; Price, C.

    2016-01-01

    In 2014, the United States (U.S.) and Canada agreed to act as co-lead countries for the initial development of the Coastal Expert Monitoring Group (CEMG) as part of the Circumpolar Biodiversity Monitoring Program (CBMP, www. cbmp.is) under the Arctic Council’s Conservation of Arctic Flora and Fauna (CAFF, www.caff.is) working group. The CAFF Management Board approved Terms of Reference for the CEMG in the spring of 2014. The primary goal of the CEMG is to develop a long term, integrated, multi-disciplinary, circumpolar Arctic Coastal Biodiversity Monitoring Plan (the Coastal Plan) that relies on science and Traditional Knowledge, and has direct and relevant application for communities, industry, government decision makers, and other users. In addition to the monitoring plan, the CAFF working group has asked the CBMP, and thus the CEMG, to develop an implementation plan that identifies timeline, costs, organizational structure and partners. This background paper provides a platform for the guidance for the development of the Coastal Plan and is produced by the CEMG with assistance from a number of experts in multiple countries.

  5. 75 FR 41881 - Notice of Intent To Prepare a Shoreline Restoration and Management Plan/Environmental Impact...

    Science.gov (United States)

    2010-07-19

    ... lakeshore; and improved water quality. DATES: Any comments on the scope of issues to be addressed in the EIS... Restoration and Management Plan/Environmental Impact Statement (EIS) for Indiana Dunes National Lakeshore... impact statement (EIS) for a Shoreline Restoration and Management Plan (SRMP) for Indiana Dunes National...

  6. Deformation effects in rock massifs and their long-term monitoring

    Czech Academy of Sciences Publication Activity Database

    Košťák, Blahoslav

    2006-01-01

    Roč. 39, č. 3 (2006), s. 249-258 ISSN 1470-9236 R&D Projects: GA MŠk(CZ) OC 625.10 Institutional research plan: CEZ:AV0Z30460519 Keywords : anchors * extensometers * monitoring Subject RIV: DO - Wilderness Conservation Impact factor: 0.778, year: 2006

  7. Emergency radiological monitoring and analysis United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    1994-01-01

    The United States Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. Following a major radiological incident the FRERP authorizes the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC). The FRMAC is established to coordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted states and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for coordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis and quality assurance. This program includes: (1) Aerial Radiological Monitoring - Fixed Wing and Helicopter, (2) Field Monitoring and Sampling, (3) Radioanalysis - Mobile and Fixed Laboratories, (4) Radiation Detection Instrumentation - Calibration and Maintenance, (5) Environmental Dosimetry, and (6) An integrated program of Quality Assurance. To assure consistency, completeness and the quality of the data produced, a methodology and procedures handbook is being developed. This paper discusses the structure, assets and operations of FRMAC monitoring and analysis and the content and preparation of this handbook

  8. Strain Wave Acquisition by a Fiber Optic Coherent Sensor for Impact Monitoring.

    Science.gov (United States)

    Sbarufatti, Claudio; Beligni, Alessio; Gilioli, Andrea; Ferrario, Maddalena; Mattarei, Marco; Martinelli, Mario; Giglio, Marco

    2017-07-13

    A novel fiber optic sensing technology for high frequency dynamics detection is proposed in this paper, specifically tailored for structural health monitoring applications based on strain wave analysis, for both passive impact identification and active Lamb wave monitoring. The sensing solution relies on a fiber optic-based interferometric architecture associated to an innovative coherent detection scheme, which retrieves in a completely passive way the high-frequency phase information of the received optical signal. The sensing fiber can be arranged into different layouts, depending on the requirement of the specific application, in order to enhance the sensor sensitivity while still ensuring a limited gauge length if punctual measures are required. For active Lamb wave monitoring, this results in a sensing fiber arranged in multiple loops glued on an aluminum thin panel in order to increase the phase signal only in correspondence to the sensing points of interest. Instead, for passive impact identification, the required sensitivity is guaranteed by simply exploiting a longer gauge length glued to the structure. The fiber optic coherent (FOC) sensor is exploited to detect the strain waves emitted by a piezoelectric transducer placed on the aluminum panel or generated by an impulse hammer, respectively. The FOC sensor measurements have been compared with both a numerical model based on Finite Elements and traditional piezoelectric sensors, confirming a good agreement between experimental and simulated results for both active and passive impact monitoring scenarios.

  9. Salt Repository Project site study plan for seismographic monitoring: Revision 1

    International Nuclear Information System (INIS)

    1987-01-01

    This site study plan describes the seismographic monitoring activities to be conducted during the early stages of Site Characterization at the Deaf Smith County site, Texas. The field programs has been designed to provide data useful in addressing information/data needs resulting from Federal/State/local regulatory requirements and repository program requirements. Sixteen new and three relocated seismographic stations will be added to the now existing network of 13 stations for a total of 32 stations in the network. The areal extent is being expanded and selected regions covered more densely to provide more accurate monitoring and location of microearthquakes. More sophisticated instruments are being used at selected locations to allow for more detailed analysis. A few seismographs are being installed at depth to provide a limited 3-D monitoring network in the area of the repository. The Salt Repository Project (SRP) Networks specify the schedule under which the program will operate. The Technique Field Services Contractor (TFSC) is responsible for conducting the field program. Data will be handled and reported in accordance with established SRP procedures. A quality assurance program will be utilized to assure that activities affecting quality are performed correctly and that appropriate documentation is maintained. 32 refs., 11 figs., 4 tabs

  10. DETECTION OF REFLEXIVE SIGNS IN TOWN PLANNING SYSTEMS OF UKRAINE AND REPUBLIC OF BELARUS

    Directory of Open Access Journals (Sweden)

    V. A. Smilka

    2018-01-01

    Full Text Available As a city is a complex system, it complies with the principles pertaining to organization and management of systems. System analysis makes it possible to figure out the difference between managing systems (subject from systems that are managed (object. There is a link between these system formations which unites them in a common system. Such relationship is a source of information for development of management action. Impact on the system is achieved through availability of influential means and data. Urban planning science represents a city as a complex of socio-economic, territorial-productive and demographic-ecological systems of the following type: “population” – “environment” – “activity”. “Environment” is thought of as a technical system with such synonyme notions as “urban planning system”, “anthropogenic environment”, “settlement system”. “Environment” has two components – territory and buildings. Ukrainian legislation determines that management of urban planning activities is carried out through developing urban planning documentation and carrying out urban planning monitoring. Results of the urban planning monitoring are taken into account while preparing urban planning documentation (introduction of amendments to it and programs of socio-economic development. Thus, urban planning monitoring represents a management system of urban planning activity in the Ukraine. Legislation of the Republic of Belarus contains some provisions which regulate urban planning activity through urban development planning and zoning of territories; creation and maintenance of urban planning cadastre; control over development and implementation of urban planning, architectural and construction projects; implementation of state construction supervision. Data of the urban planning cadastre are taken into account in urban planning documentation. In comparison with the Ukraine management of the urban planning system in the

  11. Facility Effluent Monitoring Plan for Pacific Northwest National Laboratory Balance-of-Plant Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Ballinger, Marcel Y.; Gervais, Todd L.

    2004-11-15

    The Pacific Northwest National Laboratory (PNNL) operates a number of Research & Development (R&D) facilities for the U.S. Department of Energy (DOE) on the Hanford Site. Facility effluent monitoring plans (FEMPs) have been developed to document the facility effluent monitoring portion of the Environmental Monitoring Plan (DOE 2000) for the Hanford Site. Three of PNNL’s R&D facilities, the 325, 331, and 3720 Buildings, are considered major emission points for radionuclide air sampling, and individual FEMPs were developed for these facilities in the past. In addition, a balance-of-plant (BOP) FEMP was developed for all other DOE-owned, PNNL-operated facilities at the Hanford Site. Recent changes, including shutdown of buildings and transition of PNNL facilities to the Office of Science, have resulted in retiring the 3720 FEMP and combining the 331 FEMP into the BOP FEMP. This version of the BOP FEMP addresses all DOE-owned, PNNL-operated facilities at the Hanford Site, excepting the Radiochemical Processing Laboratory, which has its own FEMP because of the unique nature of the building and operations. Activities in the BOP facilities range from administrative to laboratory and pilot-scale R&D. R&D activities include both radioactive and chemical waste characterization, fluid dynamics research, mechanical property testing, dosimetry research, and molecular sciences. The mission and activities for individual buildings are described in Appendix A. Potential radioactive airborne emissions in the BOP facilities are estimated annually using a building inventory-based approach provided in federal regulations. Sampling at individual BOP facilities is based on a potential-to-emit assessment. Some of these facilities are considered minor emission points and thus are sampled routinely, but not continuously, to confirm the low emission potential. One facility, the 331 Life Sciences Laboratory, has a major emission point and is sampled continuously. Sampling systems are

  12. The Argonne Radiological Impact Program (ARIP). Part II. MONITOR: A Program and Data Base for Retrieval and Utilization of Pollutant Monitoring Data

    Energy Technology Data Exchange (ETDEWEB)

    Eckerman, Keith F.; Stowe, Ralph F.; Frigerio, Norman A.

    1977-02-01

    The Argonne Radiological Impact Program (ARIP) is an ongoing project of the Laboratory's Division of Environmental Impact Studies that aims at developing methodologies for assessing the carcinogenic hazards associated with nuclear power development. The project's first report (ANL/ES-26, Part I), published in September.l973, discussed models of radiation carcinogenesis and the contribution of U .. S. background radiation levels to hazardous dose rates. The current report (Part II) treats the storage and access of available data on radiation and radioactivity levels in the u. S. A compute-r code. (the MONITOR program) is prf!sented, which can serve as a ready-access data. bank for all monitoring data acquired over the past two decades. The MONITOR program currently stores data on monitoring locations, types of monitoring efforts, and types of monitoring data. reported in Radiation Data and Reports by the various state and federal ne-tworks; expansion of this data base to include nuclear power facilities in operation or on order is ongoing ·. The MONITOR code retrieves information within a search radius, or rectangl.e ,. circumscribed by parameters of latitude and longitude, and l:.ists or maps the data_as: requested. The code, with examples, is given in full in the report ..

  13. Real time monitoring system used in route planning for the electric vehicle

    Science.gov (United States)

    Ionescu, LM; Mazare, A.; Serban, G.; Ionita, S.

    2017-10-01

    The electric vehicle is a new consumer of electricity that is becoming more and more widespread. Under these circumstances, new strategies for optimizing power consumption and increasing vehicle autonomy must be designed. These must include route planning along with consumption, fuelling points and points of interest. The hardware and software solution proposed by us allows: non-invasive monitoring of power consumption, energy autonomy - it does not add any extra consumption, data transmission to a server and data fusion with the route, the points of interest of the route and the power supply points. As a result: an optimal route planning service will be provided to the driver, considering the route, the requirements of the electric vehicle and the consumer profile. The solution can be easily installed on any type of electric car - it does not involve any intervention on the equipment.

  14. Impact of the 1978 ADEA Amendments on Employee Benefit Plans.

    Science.gov (United States)

    Mamorsky, Jeffrey D.

    1978-01-01

    The impact on employee benefit plans of the Age Discrimination in Employment Act amendments that raised the mandatory retirement age is addressed through a discussion and analysis of legislative history, court decisions, Department of Labor regulations, wage-hour rulings, and opinion letters. (Author/JMD)

  15. Impact of Dynamics of Planned Change on Employees Quality of ...

    African Journals Online (AJOL)

    In this study, we determined the impact of organizational planned change programmes on the quality of worklife (QWL) of employees. The study involved four organizations selected from both the private and public sector establishments in Port Harcourt. Two organizations were randomly selected from each sector.

  16. Scientific monitoring plan in support of the selected alternative of the Glen Canyon Dam Long-Term Experimental and Management Plan

    Science.gov (United States)

    Vanderkooi, Scott P.; Kennedy, Theodore A.; Topping, David J.; Grams, Paul E.; Ward, David L.; Fairley, Helen C.; Bair, Lucas S.; Sankey, Joel B.; Yackulic, Charles B.; Schmidt, John C.

    2017-01-18

    IntroductionThe purpose of this document is to describe a strategy by which monitoring and research data in the natural and social sciences will be collected, analyzed, and provided to the U.S. Department of the Interior (DOI), its bureaus, and to the Glen Canyon Dam Adaptive Management Program (GCDAMP) in support of implementation of the Glen Canyon Dam Long-Term Experimental and Management Plan (LTEMP) (U.S. Department of the Interior, 2016a). The selected alternative identified in the LTEMP Record of Decision (ROD) (U.S. Department of the Interior, 2016b) describes various data collection, analysis, modeling, and interpretation efforts to be conducted by the U.S. Geological Survey’s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), partner agencies, and cooperators that will inform decisions about operations of Glen Canyon Dam and management of downstream resources between 2017 and 2037, the performance period of the LTEMP. General data collection, analysis, modeling, and interpretation activities are described in this science plan, whereas specific monitoring and research activities and detailed study plans are to be described in the GCDAMP’s triennial work plans (TWPs) to be developed by the Bureau of Reclamation and GCMRC with input from partner agencies and cooperators during the LTEMP period, which are to be reviewed and recommended by the GCDAMP and approved by the Secretary of the Interior. The GCDAMP consists of several components, the primary committee being the Adaptive Management Work Group (AMWG). This Federal advisory committee is composed of 25 agencies and stakeholder groups and is chaired by the Secretary of the Interior’s designee. The AMWG makes recommendations to the Secretary of the Interior concerning operations of Glen Canyon Dam and other experimental management actions that are intended to fulfill some obligations of the Grand Canyon Protection Act of 1992. The Technical Work Group (TWG) is a subcommittee of the AMWG and

  17. Maintenance Planning of Offshore Wind Turbine using Condition Monitoring Information

    DEFF Research Database (Denmark)

    Ramírez, José G. Rangel; Sørensen, John Dalsgaard

    2009-01-01

    Deterioration processes such as fatigue and corrosion are typically affecting offshore structures. To "control" this deterioration, inspection and maintenance activities are developed. Probabilistic methodologies represent an important tool to identify the suitable strategy to inspect and control...... the deterioration in structures such as offshore wind turbines (OWT). Besides these methods, the integration of condition monitoring information (CMI) can optimize the mitigation activities as an updating tool. In this paper, a framework for risk-based inspection and maintenance planning (RBI) is applied for OWT....... With the integration of CMI by means Bayesian inference, a slightly change of first inspection times are coming up, influenced by the reduction of the uncertainty and harsher or milder external agents....

  18. Improving health aid for a better planet: The planning, monitoring and evaluation tool (PLANET).

    Science.gov (United States)

    Sridhar, Devi; Car, Josip; Chopra, Mickey; Campbell, Harry; Woods, Ngaire; Rudan, Igor

    2015-12-01

    International development assistance for health (DAH) quadrupled between 1990 and 2012, from US$ 5.6 billion to US$ 28.1 billion. This generates an increasing need for transparent and replicable tools that could be used to set investment priorities, monitor the distribution of funding in real time, and evaluate the impact of those investments. In this paper we present a methodology that addresses these three challenges. We call this approach PLANET, which stands for planning, monitoring and evaluation tool. Fundamentally, PLANET is based on crowdsourcing approach to obtaining information relevant to deployment of large-scale programs. Information is contributed in real time by a diverse group of participants involved in the program delivery. PLANET relies on real-time information from three levels of participants in large-scale programs: funders, managers and recipients. At each level, information is solicited to assess five key risks that are most relevant to each level of operations. The risks at the level of funders involve systematic neglect of certain areas, focus on donor's interests over that of program recipients, ineffective co-ordination between donors, questionable mechanisms of delivery and excessive loss of funding to "middle men". At the level of managers, the risks are corruption, lack of capacity and/or competence, lack of information and /or communication, undue avoidance of governmental structures / preference to non-governmental organizations and exclusion of local expertise. At the level of primary recipients, the risks are corruption, parallel operations / "verticalization", misalignment with local priorities and lack of community involvement, issues with ethics, equity and/or acceptability, and low likelihood of sustainability beyond the end of the program's implementation. PLANET is intended as an additional tool available to policy-makers to prioritize, monitor and evaluate large-scale development programs. In this, it should complement

  19. Public recreation and landscape protection- Hand in hand with visitor monitoring

    NARCIS (Netherlands)

    Jaarsma, C.F.; Beunen, R.; Vries, de J.R.

    2013-01-01

    Policy makers and managers of natural areas have to deal with competing socio-economic and environmental interests. The planning and management of these areas depends on accurate and sufficiently detailed information. Data from long-term monitoring are essential for assessing visitor impact on

  20. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    Directory of Open Access Journals (Sweden)

    Karin LIMAPORNWANITCH

    2004-01-01

    Full Text Available Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA in harmonizing land developments and transportation improvements, but without a complete land-use comprehensive plan, the TIA cannot effectively manage urbanization. This paper intends to propose a Zonal Impact Analysis (ZIA framework as a strategic planning tool to balance travel demands of land developments and performance of transportation systems over urban areas. First, the land-use planning situation in Bangkok is explained, afterwards the framework is described. The framework is applied into Bangkapi areas as a case study. Both single and simultaneous development cases are considered. It was found that more comprehensive development alternatives were established. The most suitable zone for a single project is Zone 179, as the advantages of location in the center of radial networks, so full accessibility can be provided. Without any network improvements in Zone 179, the simultaneous developments should be implemented in Zone 168 and 173, as high capacities of the expressway are available. The results give a better understanding on the characteristics of land-use and transportation planning in Bangkapi. Finally, it was emphasized that the ZIA framework is a strategic planning alternative to increase the capabilities of growth management for sustainable developments.

  1. Subsidence monitoring network: an Italian example aimed at a sustainable hydrocarbon E&P activity

    Directory of Open Access Journals (Sweden)

    M. C. Dacome

    2015-11-01

    Full Text Available According to the Italian law in order to start-up any new hydrocarbon exploitation activity, an Environmental Impact Assessment study has to be presented, including a monitoring plan, addressed to foresee, measure and analyze in real time any possible impact of the project on the coastal areas and on those ones in the close inland located. The occurrence of subsidence, that could partly be related to hydrocarbon production, both on-shore and off-shore, can generate great concern in those areas where its occurrence may have impacts on the local environment. ENI, following the international scientific community recommendations on the matter, since the beginning of 90's years, implemented a cutting-edge monitoring network, with the aim to prevent, mitigate and control geodynamics phenomena generated in the activity areas, with a particular attention to conservation and protection of environmental and territorial equilibrium, taking care of what is known as "sustainable development". The current ENI implemented monitoring surveys can be divided as: – Shallow monitoring: spirit levelling surveys, continuous GPS surveys in permanent stations, SAR surveys, assestimeter subsurface compaction monitoring, ground water level monitoring, LiDAR surveys, bathymetrical surveys. – Deep monitoring: reservoir deep compaction trough radioactive markers, reservoir static (bottom hole pressure monitoring. All the information, gathered through the monitoring network, allow: 1. to verify if the produced subsidence is evolving accordingly with the simulated forecast. 2. to provide data to revise and adjust the prediction compaction models 3. to put in place the remedial actions if the impact exceeds the threshold magnitude originally agreed among the involved parties. ENI monitoring plan to measure and monitor the subsidence process, during field production and also after the field closure, is therefore intended to support a sustainable field development and an

  2. Subsidence monitoring network: an Italian example aimed at a sustainable hydrocarbon E&P activity

    Science.gov (United States)

    Dacome, M. C.; Miandro, R.; Vettorel, M.; Roncari, G.

    2015-11-01

    According to the Italian law in order to start-up any new hydrocarbon exploitation activity, an Environmental Impact Assessment study has to be presented, including a monitoring plan, addressed to foresee, measure and analyze in real time any possible impact of the project on the coastal areas and on those ones in the close inland located. The occurrence of subsidence, that could partly be related to hydrocarbon production, both on-shore and off-shore, can generate great concern in those areas where its occurrence may have impacts on the local environment. ENI, following the international scientific community recommendations on the matter, since the beginning of 90's years, implemented a cutting-edge monitoring network, with the aim to prevent, mitigate and control geodynamics phenomena generated in the activity areas, with a particular attention to conservation and protection of environmental and territorial equilibrium, taking care of what is known as "sustainable development". The current ENI implemented monitoring surveys can be divided as: - Shallow monitoring: spirit levelling surveys, continuous GPS surveys in permanent stations, SAR surveys, assestimeter subsurface compaction monitoring, ground water level monitoring, LiDAR surveys, bathymetrical surveys. - Deep monitoring: reservoir deep compaction trough radioactive markers, reservoir static (bottom hole) pressure monitoring. All the information, gathered through the monitoring network, allow: 1. to verify if the produced subsidence is evolving accordingly with the simulated forecast. 2. to provide data to revise and adjust the prediction compaction models 3. to put in place the remedial actions if the impact exceeds the threshold magnitude originally agreed among the involved parties. ENI monitoring plan to measure and monitor the subsidence process, during field production and also after the field closure, is therefore intended to support a sustainable field development and an acceptable exploitation

  3. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  4. 75 FR 10308 - Fire Management Plan, Final Environmental Impact Statement, Record of Decision, Grand Canyon...

    Science.gov (United States)

    2010-03-05

    ... DEPARTMENT OF THE INTERIOR National Park Service Fire Management Plan, Final Environmental Impact... Statement for the Fire Management Plan, Grand Canyon National Park. SUMMARY: Pursuant to the National... the Record of Decision for the Fire Management Plan, Grand Canyon National Park, Arizona. On January...

  5. 76 FR 22721 - Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact...

    Science.gov (United States)

    2011-04-22

    ...] Notice of Availability of Draft Resource Management Plans and Associated Environmental Impact Statement for the Bighorn Basin Resource Management Plan Revision Project, Cody and Worland Field Offices... Draft Resource Management Plan (RMP) for the Cody Field Office, a Draft RMP for the Worland Field Office...

  6. Impact of leaf motion constraints on IMAT plan quality, deliver accuracy, and efficiency

    International Nuclear Information System (INIS)

    Chen Fan; Rao Min; Ye Jinsong; Shepard, David M.; Cao Daliang

    2011-01-01

    Purpose: Intensity modulated arc therapy (IMAT) is a radiation therapy delivery technique that combines the efficiency of arc based delivery with the dose painting capabilities of intensity modulated radiation therapy (IMRT). A key challenge in developing robust inverse planning solutions for IMAT is the need to account for the connectivity of the beam shapes as the gantry rotates from one beam angle to the next. To overcome this challenge, inverse planning solutions typically impose a leaf motion constraint that defines the maximum distance a multileaf collimator (MLC) leaf can travel between adjacent control points. The leaf motion constraint ensures the deliverability of the optimized plan, but it also impacts the plan quality, the delivery accuracy, and the delivery efficiency. In this work, the authors have studied leaf motion constraints in detail and have developed recommendations for optimizing the balance between plan quality and delivery efficiency. Methods: Two steps were used to generate optimized IMAT treatment plans. The first was the direct machine parameter optimization (DMPO) inverse planning module in the Pinnacle 3 planning system. Then, a home-grown arc sequencer was applied to convert the optimized intensity maps into deliverable IMAT arcs. IMAT leaf motion constraints were imposed using limits of between 1 and 30 mm/deg. Dose distributions were calculated using the convolution/superposition algorithm in the Pinnacle 3 planning system. The IMAT plan dose calculation accuracy was examined using a finer sampling calculation and the quality assurance verification. All plans were delivered on an Elekta Synergy with an 80-leaf MLC and were verified using an IBA MatriXX 2D ion chamber array inserted in a MultiCube solid water phantom. Results: The use of a more restrictive leaf motion constraint (less than 1-2 mm/deg) results in inferior plan quality. A less restrictive leaf motion constraint (greater than 5 mm/deg) results in improved plan quality

  7. Potential Impact of Planned Andean Dams on the Amazon Fluvial Ecosystem

    Science.gov (United States)

    Forsberg, B.; Melack, J. M.; Dunne, T.; Barthem, R. B.; Paiva, R. C. D.; Sorribas, M.; Silva, U. L., Jr.

    2016-12-01

    Increased energy demand has led to plans for building 151 new dams in the western Amazon, mostly in the Andes Region. Historical data and simulation scenarios were used to explore potential impacts above and below six of the largest storage dams planned for the region. These impacts included: 1) reduction in the downstream sediment supply 2) reduction in the downstream nutrient supply, 3) attenuation of the downstream flood pulse and 4) increased greenhouse gas emissions. Together, the six dams are expected to reduce the total downstream supply of sediments, total phosphorus (TP) and total nitrogen (TN) from the Andes by 66, 65 and 49%, respectively. These large reductions in sediment and nutrient supplies will have major impacts on channel geomorphology, floodplain fertility and aquatic productivity. These impacts are expected to be greatest close to the dams but could also extend to the central Amazon floodplain and delta regions. The attenuation of the downstream flood pulse following impoundment is expected to alter the survival, phenology and growth patterns of floodplain vegetation and result in lower fish yields in the downstream regions closest to the dams. Greenhouse gas emissions above and below the dams are expected to increase, contributing to significantly higher regional and global emissions for dams. Gas fired power plants are suggested as a cleaner, less impactful alternative to meeting regional energy demands.

  8. IRP methods for Environmental Impact Statements of utility expansion plans

    International Nuclear Information System (INIS)

    Cavallo, J.D.; Hemphill, R.C.; Veselka, T.D.

    1992-01-01

    Most large electric utilities and a growing number of gas utilities in the United States are using a planning method -- Integrated Resource Planning (IRP) - which incorporates demand-side management (DSM) programs whenever the marginal cost of the DSM programs are lower than the marginal cost of supply-side expansion options. Argonne National Laboratory has applied the IRP method in its socio-economic analysis of an Environmental Impact Statement (EIS) of power marketing for a system of electric utilities in the mountain and western regions of the United States. Applying the IRP methods provides valuable information to the participants in an EIS process involving capacity expansion of an electric or gas utility. The major challenges of applying the IRP method within an EIS are the time consuming and costly task of developing a least cost expansion path for each altemative, the detailed quantification of environmental damages associated with capacity expansion, and the explicit inclusion of societal-impacts to the region

  9. Groundwater Quality Sampling and Analysis Plan for Environmental Monitoring Waste Area Grouping 6 at Oak Ridge National Laboratory. Environmental Restoration Program

    International Nuclear Information System (INIS)

    1995-09-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of Energy and managed by Martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  10. SU-E-T-131: Dosimetric Impact and Evaluation of Different Heterogenity Algorithm in Volumetric Modulated Arc Therapy Plan for Stereotactic Ablative Radiotherapy Lung Treatment with the Flattening Filter Free Beam

    Energy Technology Data Exchange (ETDEWEB)

    Chung, J; Kim, J [Seoul National University Bundang Hospital, Seongnam, Kyeonggi-do (Korea, Republic of); Lee, J [Konkuk University Medical Center, Seoul, Seoul (Korea, Republic of); Kim, Y [Choonhae College of Health Sciences, Ulsan (Korea, Republic of)

    2014-06-01

    Purpose: The present study aimed to investigate the dosimetric impacts of the anisotropic analytic algorithm (AAA) and the Acuros XB (AXB) plan for lung stereotactic ablative radiation therapy using flattening filter-free (FFF) beam. We retrospectively analyzed 10 patients. Methods: We retrospectively analyzed 10 patients. The dosimetric parameters for the target and organs at risk (OARs) from the treatment plans calculated with these dose calculation algorithms were compared. The technical parameters, such as the computation times and the total monitor units (MUs), were also evaluated. Results: A comparison of DVHs from AXB and AAA showed that the AXB plan produced a high maximum PTV dose by average 4.40% with a statistical significance but slightly lower mean PTV dose by average 5.20% compared to the AAA plans. The maximum dose to the lung was slightly higher in the AXB compared to the AAA. For both algorithms, the values of V5, V10 and V20 for ipsilateral lung were higher in the AXB plan more than those of AAA. However, these parameters for contralateral lung were comparable. The differences of maximum dose for the spinal cord and heart were also small. The computation time of AXB was found fast with the relative difference of 13.7% than those of AAA. The average of monitor units (MUs) for all patients was higher in AXB plans than in the AAA plans. These results indicated that the difference between AXB and AAA are large in heterogeneous region with low density. Conclusion: The AXB provided the advantages such as the accuracy of calculations and the reduction of the computation time in lung stereotactic ablative radiotherapy (SABR) with using FFF beam, especially for VMAT planning. In dose calculation with the media of different density, therefore, the careful attention should be taken regarding the impacts of different heterogeneity correction algorithms. The authors report no conflicts of interest.

  11. SU-E-T-131: Dosimetric Impact and Evaluation of Different Heterogenity Algorithm in Volumetric Modulated Arc Therapy Plan for Stereotactic Ablative Radiotherapy Lung Treatment with the Flattening Filter Free Beam

    International Nuclear Information System (INIS)

    Chung, J; Kim, J; Lee, J; Kim, Y

    2014-01-01

    Purpose: The present study aimed to investigate the dosimetric impacts of the anisotropic analytic algorithm (AAA) and the Acuros XB (AXB) plan for lung stereotactic ablative radiation therapy using flattening filter-free (FFF) beam. We retrospectively analyzed 10 patients. Methods: We retrospectively analyzed 10 patients. The dosimetric parameters for the target and organs at risk (OARs) from the treatment plans calculated with these dose calculation algorithms were compared. The technical parameters, such as the computation times and the total monitor units (MUs), were also evaluated. Results: A comparison of DVHs from AXB and AAA showed that the AXB plan produced a high maximum PTV dose by average 4.40% with a statistical significance but slightly lower mean PTV dose by average 5.20% compared to the AAA plans. The maximum dose to the lung was slightly higher in the AXB compared to the AAA. For both algorithms, the values of V5, V10 and V20 for ipsilateral lung were higher in the AXB plan more than those of AAA. However, these parameters for contralateral lung were comparable. The differences of maximum dose for the spinal cord and heart were also small. The computation time of AXB was found fast with the relative difference of 13.7% than those of AAA. The average of monitor units (MUs) for all patients was higher in AXB plans than in the AAA plans. These results indicated that the difference between AXB and AAA are large in heterogeneous region with low density. Conclusion: The AXB provided the advantages such as the accuracy of calculations and the reduction of the computation time in lung stereotactic ablative radiotherapy (SABR) with using FFF beam, especially for VMAT planning. In dose calculation with the media of different density, therefore, the careful attention should be taken regarding the impacts of different heterogeneity correction algorithms. The authors report no conflicts of interest

  12. Wind power installations in Switzerland - Regional planning basics and impact

    International Nuclear Information System (INIS)

    Ott, W.; Kaufmann, Y.; Steiner, P.; Gilgen, K.; Sartoris, A.

    2008-01-01

    This report published by the Swiss Federal Office of Energy (SFOE) takes a look at the basics of regional planning and its impact on the construction of wind-energy installations in Switzerland. The authors state that the planning and realisation of wind turbine installations is often time and resource consuming: this document presents and discusses the results obtained in a project that aimed to supply consolidated knowledge on project-relevant basics and their effect with respect to wind-energy installations. Experience gained in Switzerland and in other countries is discussed. This report on the basics of wind-energy planning with its detailed information formed the basis of a checklist described in a further report. In nine chapters, regional planning aspects, environment and landscape-relevant aspects, effects on the national and regional economies and social acceptance factors are discussed. Also, success-factors and possible solutions for the successful realisation of wind-energy projects are looked at.

  13. Evaluating the Portuguese National Reading Plan: Teachers' Perceptions on the Impact in Schools

    Science.gov (United States)

    da Costa, António Firmino; Pegado, Elsa; Ávila, Patrícia; Coelho, Ana Rita

    2015-01-01

    This article focuses on teachers' perceptions of the implementation and impact in Portuguese schools of a wide-ranging and long-term reading promotion programme. The Portuguese National Reading Plan (PNRP) was a public policy initiative whose purpose was to increase literacy levels and reading habits among the population. The Plan identified…

  14. Monitoring of atmospheric excess 14C around Paks Nuclear Power Plant, Hungary

    Czech Academy of Sciences Publication Activity Database

    Molnár, M.; Bujtás, T.; Svingor, E.; Futó, I.; Světlík, Ivo

    2007-01-01

    Roč. 49, č. 2 (2007), s. 1031-1043 ISSN 0033-8222 Institutional research plan: CEZ:AV0Z10480505 Keywords : radiocarbon * monitoring * atmospheric excess 14C Subject RIV: DL - Nuclear Waste, Radioactive Pollution ; Quality Impact factor: 1.164, year: 2007

  15. PERSPECTIVE How committed are we to monitoring human impacts in Antarctica?

    Science.gov (United States)

    Hughes, Kevin A.

    2010-12-01

    environmental impacts caused by any new infrastructure that requires the completion of a Comprehensive Environmental Evaluation during the planning, as would be required for research stations or other large building projects. Ideally, monitoring should include assessment of levels of physical disruption of marine and terrestrial habitats, and should record levels of pollutants and also their impacts upon the full range of biological groups within local ecosystems. Biodiversity surveys should also be undertaken, in order that introduced non-native species can be identified at an early stage and eradicated (Hughes and Convey 2010). But where can the scientific data describing national Antarctic programme impacts be found? Some nations have a good track record of publishing environmental monitoring data, but the large majority do not. With around 75 active stations, monitoring research should be well represented in the scientific literature, but data for most stations are not available. Furthermore, Antarctic Treaty signatory nations are required to supply details of their monitoring work through the Antarctic Treaty System's Electronic Information Exchange System (see www.ats.aq/e/ie.htm), yet only three out of 28 Treaty nations did so for 2008/2009. In their recent synthesis paper, Kennicutt et al (2010) describe the results of a long-term monitoring programme at the United States' McMurdo Station, giving us a comprehensive picture of human impacts at this location. The high quality and breadth of this research makes it one of the best-documented and longest-running monitoring programmes within Antarctica to date. Yet, why is this work so exceptional, when the USA have simply fulfilled their obligations under the Environmental Protocol? Monitoring programmes of this standard should be undertaken for all stations and large infrastructure. Factors preventing this may include (1) a lack of monitoring expertise or access to sophisticated techniques, particularly by smaller or less

  16. The Impact of Forecasting on Strategic Planning and Decision Making

    African Journals Online (AJOL)

    The Impact of Forecasting on Strategic Planning and Decision Making: An Exploratory ... lead to the failure to achieve projected performance. ... the use of multiple regression analysis model to forecast the stock market activities of each sector ... making, and that these decisions must be congruent with the company strategy.

  17. Robotic weed monitoring

    DEFF Research Database (Denmark)

    Bochtis, Dionysis; Sørensen, Claus Aage Grøn; Jørgensen, R N

    2011-01-01

    Abstract: In this paper, an integrated management system for the planning and activation of thefield monitoring task is presented. The architecture of the system is built around a mobile roboticunit. The internet based architecture of the system includes a station unit that works as a mobileon-fa...... of the weed monitoring operation.Key words: autonomous vehicles, farm management, mission planning, route planning,sampling....

  18. Quantifying impact reduction due to avoidance, minimization and restoration for a natural gas pipeline in the Peruvian Andes

    International Nuclear Information System (INIS)

    Sahley, C.T.; Vildoso, B.; Casaretto, C.; Taborga, P.; Ledesma, K.; Linares-Palomino, R.; Mamani, G.; Dallmeier, F.; Alonso, A.

    2017-01-01

    We present monitoring methods and quantitative biodiversity data to document components of the mitigation hierarchy. We estimated avoidance, minimization, restoration and impact reduction in quality hectares for the 25 m wide right of way of a 408 km natural gas buried pipeline that crosses 14 Ecological Landscape Units (ELUs) in the tropical Andes of Peru. We found that applying the mitigation hierarchy as part of a comprehensive biodiversity action plan substantially reduced impacts on biodiversity in all habitats studied. Avoidance and right of way minimization contributed to significant impact reduction. We quantified impact reduction during construction and operation on the right of way of the pipeline over a five-year period and found that restoration was the greatest contributor to reducing impacts. We documented that most ELUs have a positive restoration trajectory. We also documented how monitoring over large scale spatial scales, in combination with site-specific monitoring, generated data for management to determine restoration priorities and impact mitigation. A biodiversity action plan that incorporated the mitigation hierarchy and a science-based biodiversity monitoring and assessment program contributed to biodiversity management of the project and played an important role in minimizing and managing impacts. - Highlights: •Quantitative data for mitigation hierarchy components are presented. •Application of the mitigation hierarchy reduced impacts on biodiversity. •A biodiversity monitoring program provided data to reduce impacts.

  19. Shale gas impacts on groundwater resources: insights from monitoring a fracking site in Poland

    Science.gov (United States)

    Montcoudiol, Nelly; Isherwood, Catherine; Gunning, Andrew; Kelly, Thomas; Younger, Paul

    2017-04-01

    Exploitation of shale gas by hydraulic fracturing (fracking) is highly controversial and concerns have been raised regarding induced risks from this technique. The SHEER project, an EU Horizon 2020-funded project, is looking into developing best practice to understand, prevent and mitigate the potential short- and long-term environmental impacts and risks from shale gas exploration and exploitation. Three major potential impacts were identified: groundwater contamination, air pollution and induced seismicity. This presentation will deal with the hydrogeological aspect. As part of the SHEER project, four monitoring wells were installed at a shale gas exploration site in Northern Poland. They intercept the main drinking water aquifer located in Quaternary sediments. Baseline monitoring was carried out from mid-December 2015 to beginning of June 2016. Fracking operations occurred in two horizontal wells, in two stages, in June and July 2016. The monitoring has continued after fracking was completed, with site visits every 4-6 weeks. Collected data include measurements of groundwater level, conductivity and temperature at 15-minute intervals, frequent sampling for laboratory analyses and field measurements of groundwater physico-chemical parameters. Groundwater samples are analysed for a range of constituents including dissolved gases and isotopes. The presentation will focus on the interpretation of baseline monitoring data. The insights gained into the behaviour of the Quaternary aquifer will allow a greater perspective to be place on the initial project understanding draw from previous studies. Short-term impacts will also be discussed in comparison with the baseline monitoring results. The presentation will conclude with discussion of challenges regarding monitoring of shale gas fracking sites.

  20. Statistical analysis and planning of multihundred-watt impact tests

    International Nuclear Information System (INIS)

    Martz, H.F. Jr.; Waterman, M.S.

    1977-10-01

    Modular multihundred-watt (MHW) radioisotope thermoelectric generators (RTG's) are used as a power source for spacecraft. Due to possible environmental contamination by radioactive materials, numerous tests are required to determine and verify the safety of the RTG. There are results available from 27 fueled MHW impact tests regarding hoop failure, fingerprint failure, and fuel failure. Data from the 27 tests are statistically analyzed for relationships that exist between the test design variables and the failure types. Next, these relationships are used to develop a statistical procedure for planning and conducting either future MHW impact tests or similar tests on other RTG fuel sources. Finally, some conclusions are given

  1. Diagnostic tool for structural health monitoring: effect of material nonlinearity and vibro-impact process

    Science.gov (United States)

    Hiwarkar, V. R.; Babitsky, V. I.; Silberschmidt, V. V.

    2013-07-01

    Numerous techniques are available for monitoring structural health. Most of these techniques are expensive and time-consuming. In this paper, vibration-based techniques are explored together with their use as diagnostic tools for structural health monitoring. Finite-element simulations are used to study the effect of material nonlinearity on dynamics of a cracked bar. Additionally, several experiments are performed to study the effect of vibro-impact behavior of crack on its dynamics. It was observed that a change in the natural frequency of the cracked bar due to crack-tip plasticity and vibro-impact behavior linked to interaction of crack faces, obtained from experiments, led to generation of higher harmonics; this can be used as a diagnostic tool for structural health monitoring.

  2. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    International Nuclear Information System (INIS)

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapra americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures

  3. 76 FR 75557 - Draft Environmental Impact Statement for General Management Plan/Wilderness Study, Hawaii...

    Science.gov (United States)

    2011-12-02

    ... Environmental Impact Statement for General Management Plan/ Wilderness Study, Hawaii Volcanoes National Park, Hawaii AGENCY: National Park Service, Interior. ACTION: Notice of intent. SUMMARY: The National Park... updating the General Management Plan (GMP) for Hawaii Volcanoes National Park. As part of this conservation...

  4. The Emergency Radiological Monitoring and Analysis Division of the United States Federal Radiological Monitoring and Assessment Center

    International Nuclear Information System (INIS)

    Thome, D.J.

    2000-01-01

    The U.S. Federal Radiological Emergency Response Plan (FRERP) provides the framework for integrating the various Federal agencies responding to a major radiological emergency. The FRERP authorises the creation of the Federal Radiological Monitoring and Assessment Center (FRMAC), which is established to co-ordinate all Federal agencies involved in the monitoring and assessment of the off-site radiological conditions in support of the impacted States and the Lead Federal Agency (LFA). Within the FRMAC, the Monitoring and Analysis Division is responsible for co-ordinating all FRMAC assets involved in conducting a comprehensive program of environmental monitoring, sampling, radioanalysis, and quality assurance. This program includes: 1. Aerial Radiological Monitoring - Fixed-Wing and Helicopter; 2. Field Monitoring and Sampling; 3. Radioanalysis - Mobile and Fixed Laboratories; 4. Radiation Detection Instrumentation - Calibration and Maintenance; 5. Environmental Dosimetry; 6. Integrated program of Quality Assurance. To assure consistency, completeness, and the quality of the data produced, a methodology and procedures manual is being developed. This paper discusses the structure, assets, and operations of the FRMAC Monitoring and Analysis Division and the content and preparation of the manual. (author)

  5. Environmental impact assessment of abnormal events: a follow-up study

    International Nuclear Information System (INIS)

    Hunsaker, D.B. Jr.; Lee, D.W.

    1985-01-01

    Impact analyses included in environmental assessments for a selected nuclear power plant, petroleum storage facility, crude oil pipeline, and geopressure well that have experienced operational, abnormal events are compared with the data quantifying the environmental impacts of the events. Comparisons of predicted vs actual impacts suggests that prediction of the types of events and associated impacts could be improved; in some instances, impacts have been underestimated. Analysis of abnormal events is especially important in environmental assessment documents addressing a technology that is novel or unique to a particular area. Incorporation of abnormal event impact analysis into project environmental monitoring and emergency response plans can help improve these plans and can help reduce the magnitude of environmental impacts resulting from said events

  6. Identifying the 'if' for 'if-then' plans : Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, Aukje A. C.; Adriaanse, Marieke A.; de Vet, Emely; Fennis, Bob M.; de Ridder, Denise T. D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,

  7. RAW MILK IN AUTOMATIC SALE MACHINES: MONITORING PLAN IN PIEDEMONT REGION

    Directory of Open Access Journals (Sweden)

    S. Gallina

    2010-06-01

    Full Text Available Raw milk at vending machine is surging in popularity amongst consumers of Northern Italy; indeed in Piedmont Region there are more than 100 vending machines. In June 2008 Piedmont Region set out a specific monitoring plan to check the milk quality. From June to December 2008, 113 raw milk samples were collected at vending machines. Samples were analysed for Listeria monocytogenes, Salmonella spp., coagulase positive staphylococci, Staphylococcus aureus and Campylobacter. Moreover, 100 samples were analysed for the quantification of aflatoxin M1. 26 samples have been resulted Not Conform for the hygienic criteria and 1 exceeded the aflatoxin M1 limit.

  8. Challenges in developing a remediation plan, procurement plan and long term monitoring program for the former port radium uranium mine that meets the needs of the community of Deline - 59333

    International Nuclear Information System (INIS)

    Ward, Julie

    2012-01-01

    Document available in abstract form only. Full text of publication follows: After a five year political process to investigate historic and present day concerns about the former Port Radium Uranium Mine, the site has being remediated to present day standards. Prior to remediation Indian and Northern Affairs Canada (INAC) worked with Deline First Nations to develop a Remediation Plan that was suitable to the known environmental conditions and identified risks on site. Prior to remediation INAC obtained a land use permit and Waste Nuclear Substance License for the work that was carried out and for future storage of radioactive wastes. After the remediation plan was complete a procurement plan was developed for the work which followed Federal contracting polices, met the intent of the Sahtu Dene and Metis Comprehensive Land Claim Agreement and abided by INAC's commitment under the Canada Deline Uranium Table to maximize local participation and subcontracting opportunities. Lastly, INAC worked with Deline to develop a monitoring plan in hopes to begin to restore their confidence in their environment while monitoring engineered remedial structures and residual risks on site. (author)

  9. Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

    Science.gov (United States)

    USEPA Region 6 and the US Army Corps of Engineers submit for public comment the Draft Site Management and Monitoring Plan for Corpus Christi Maintenance and New Work Ocean Dredged Material Disposal Site

  10. Monitoring of urban growth and its related environmental impacts: Niamey case study

    Science.gov (United States)

    Perotti, Luigi; Tankari Dan-Badjo, Abdourahamane; De Luca, Domenico Antonio; Antonella Dino, Giovanna; Lasagna, Manuela; Spadafora, Francesco; Yadji, Guero; Konaté, Moussa

    2016-04-01

    The present contribution is about a preliminary study of the evolution of Niamey city (Niger) during last decades. Such research is part of an UNICOO project (funded by the University of Turin) and connected to the Edulink Cooperation Project (R.U.S.S.A.D.E.), a multidisciplinary project between Italy, Niger, Burkina Faso and Tchad funded on ACP- EU cooperation program in Higher Education. Recent advances in remote sensing, both in satellite hardware technology (i.e. image availability) and image processing algorithm development, provide opportunities for collection and analysis of multitemporal information on urban form and size that can be useful for policy and planning. In spite of these developments, there are also limitations to remote sensing and its application in practice. Some opportunities for, and limitations on, monitoring urban growth using remote sensing data are shown in the present contribution; moreover examples of environmental impacts of urban growth, as monitored with remote sensing, are provided. Niamey is the capital of Niger and is the first city in the country in size and economic importance. Its population increased gradually, from about 3,000 units in 1930 to about 30,000 in 1960, rising to 250,000 in 1980 and, according to estimates, to 800,000 units in 2000. Its patterns of population distribution, livelihoods, and its dominant role within the national economy of Niger make it a good representative case study for West Africa. This case study will consider the recent historical context of continued urban growth and will assess potential future impacts of settlement patterns. The rapid growth of Niamey in the last decades brought relative prosperity but it certainly affected patterns of land use within the city and the emerging urban system. After a preliminary sketch of the georesources in the city (qualitative and quantitative characterization of the surface water and groundwater, and of aggregates), an analyses of the urban growth and

  11. Engineering Task Plan for the 241-AN-105 Multi-Function Corrosion Monitoring System

    International Nuclear Information System (INIS)

    EDGEMON, G.L.

    1999-01-01

    This Engineering Task Plan (ETP) describes the activities associated with the installation of the corrosion probe assembly into riser WST-RISER-016 (formerly 15B) of tank 241-AN-105. The corrosion monitoring system utilizes the technique of electrochemical noise (EN) for monitoring waste tank corrosion. Typically, EN consists of low frequency (4 Hz) and small amplitude signals that are spontaneously generated by electrochemical reactions occurring at corroding or other surfaces. EN analysis is well suited for monitoring and identifying the onset of localized corrosion, and for measuring uniform corrosion rates. A typical EN based corrosion-monitoring system measures instantaneous fluctuations in corrosion current and potential between three nominally identical electrodes of the material of interest immersed in the environment of interest. Time-dependent fluctuations in corrosion current are described by electrochemical current noise, and time-dependent fluctuations of corrosion potential are described by electrochemical noise. The corrosion monitoring system is designed to detect the onset of localized corrosion phenomena if tank conditions should change to allow these phenomena to occur. In addition to the EN technique, the system also facilitates the use of the Linear Polarization Resistance (LPR) technique to collect uniform corrosion rate information. LPR measures the linearity at the origin of the polarization curve for overvoltages up to a few millivolts away from the rest potential or natural corrosion potential. The slope of the current vs. voltage plot gives information on uniform corrosion rates

  12. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling.

  13. Groundwater quality sampling and analysis plan for environmental monitoring in Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1994-03-01

    This Sampling and Analysis Plan addresses groundwater quality sampling and analysis activities that will be conducted in support of the Environmental Monitoring Plan for Waste Area Grouping (WAG) 6. WAG 6 is a shallow-burial land disposal facility for low-level radioactive waste at the Oak Ridge National Laboratory, a research facility owned by the US Department of energy and managed by martin Marietta Energy Systems, Inc. (Energy Systems). Groundwater sampling will be conducted by Energy Systems at 45 wells within WAG 6. The samples will be analyzed for various organic, inorganic, and radiological parameters. The information derived from the groundwater quality monitoring, sampling, and analysis will aid in evaluating relative risk associated with contaminants migrating off-WAG, and also will fulfill Resource Conservation and Recovery Act (RCRA) interim permit monitoring requirements. The sampling steps described in this plan are consistent with the steps that have previously been followed by Energy Systems when conducting RCRA sampling

  14. Summary of the GNWT Dehcho regional workshop on the social impacts of the Mackenzie Valley gas project

    International Nuclear Information System (INIS)

    2005-01-01

    The proposed Mackenzie Gas Project will span at least 20 years and is expected to have significant social impacts. This workshop provided a forum for communities and government to evaluate the social impacts of the project, as well as a means for initiating collaborative planning to monitor and manage them over the next 20 years. Local plans for managing the impacts during the construction of the pipeline were discussed, as well as issues concerning future economic activity, demographic changes and long-lasting social impacts. Participants included government and community representatives from various areas in the Northwest Territories (NT). Impacts on employment and income were reviewed, as well as issues concerning housing, health and wellness. The role of the NT bureau of statistics in the monitoring of social trends was examined. Current government resources for managing impacts were evaluated as well as various social envelope departments. Community resources for managing social impacts were reviewed. Positive and negative impacts were discussed for each of the topics presented at the workshops, as well as current and future mitigation efforts. Participants developed concrete suggestions for monitoring impacts, assessing resource needs and collaborating. refs., tabs., figs.

  15. 78 FR 17224 - Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan...

    Science.gov (United States)

    2013-03-20

    ... sizable portion of South Puget Sound Prairie habitat is located in the urban-rural interface and in the...-FF01E00000] Environmental Impact Statement; Proposed South Puget Sound Prairie Habitat Conservation Plan... permit application would be associated the South Puget Sound Prairie Habitat Conservation Plan (Prairie...

  16. Chromatic monitoring of dc plasma torches: The latest developments

    Czech Academy of Sciences Publication Activity Database

    Djakov, B. E.; Enikov, R.; Oliver, D.H.; Hrabovský, Milan; Kopecký, Vladimír

    2006-01-01

    Roč. 3, č. 2 (2006), s. 170-173 ISSN 1612-8850 R&D Projects: GA ČR(CZ) GA202/05/0669 Institutional research plan: CEZ:AV0Z20430508 Keywords : chromatic monitoring * on-line control * plasma jet * plasma torch * powder Subject RIV: BL - Plasma and Gas Discharge Physics Impact factor: 2.298, year: 2006

  17. Implementation of the monitoring Plan of the State and behavior of the systems in the Central Nuclear Almaraz; Implantacion del Plan de Seguimiento del Estado y Comportamiento de Sistemas en la Central Nuclear Almaraz

    Energy Technology Data Exchange (ETDEWEB)

    Montero Puertas, I.; Gonzalez Redondo, R.; Lopez Pozo, A.

    2013-07-01

    This work aims to present the implementation process of the Monitoring of the State and behavior of the systems in the Nuclear plan Almaraz. Will define the scope, process, frequencies and criteria of evaluation of the State and behavior of the systems included in the Plan of reliability, as well as the documentary requirements of this evaluation. Cases will also be collected practical real phenomena detected during monitoring degradation made and will explain the actions taken prior to the failure.

  18. The dosimetric impact of inversely optimized arc radiotherapy plan modulation for real-time dynamic MLC tracking delivery

    International Nuclear Information System (INIS)

    Falk, Marianne; Larsson, Tobias; Keall, Paul; Chul Cho, Byung; Aznar, Marianne; Korreman, Stine; Poulsen, Per; Munck af Rosenschoeld, Per

    2012-01-01

    Purpose: Real-time dynamic multileaf collimator (MLC) tracking for management of intrafraction tumor motion can be challenging for highly modulated beams, as the leaves need to travel far to adjust for target motion perpendicular to the leaf travel direction. The plan modulation can be reduced by using a leaf position constraint (LPC) that reduces the difference in the position of adjacent MLC leaves in the plan. The purpose of this study was to investigate the impact of the LPC on the quality of inversely optimized arc radiotherapy plans and the effect of the MLC motion pattern on the dosimetric accuracy of MLC tracking delivery. Specifically, the possibility of predicting the accuracy of MLC tracking delivery based on the plan modulation was investigated. Methods: Inversely optimized arc radiotherapy plans were created on CT-data of three lung cancer patients. For each case, five plans with a single 358 deg. arc were generated with LPC priorities of 0 (no LPC), 0.25, 0.5, 0.75, and 1 (highest possible LPC), respectively. All the plans had a prescribed dose of 2 Gy x 30, used 6 MV, a maximum dose rate of 600 MU/min and a collimator angle of 45 deg. or 315 deg. To quantify the plan modulation, an average adjacent leaf distance (ALD) was calculated by averaging the mean adjacent leaf distance for each control point. The linear relationship between the plan quality [i.e., the calculated dose distributions and the number of monitor units (MU)] and the LPC was investigated, and the linear regression coefficient as well as a two tailed confidence level of 95% was used in the evaluation. The effect of the plan modulation on the performance of MLC tracking was tested by delivering the plans to a cylindrical diode array phantom moving with sinusoidal motion in the superior-inferior direction with a peak-to-peak displacement of 2 cm and a cycle time of 6 s. The delivery was adjusted to the target motion using MLC tracking, guided in real-time by an infrared optical system

  19. ZONAL IMPACT ANALYSIS OF A STRATEGIC PLANNING APPROACH FOR LAND DEVELOPMENT CONTROLS

    OpenAIRE

    LIMAPORNWANITCH, Karin; HOKAO, Kazunori; TEKNOMO, Kardi; FUKUDA, Atsushi

    2004-01-01

    Due to rapid urban developments in developing cities, the integration of land-use and transportation planning is very necessary. However, up-to-date land-use and transportation interaction planning is still difficult, because of rapid urbanization and complex relationships. The lack of human resources, budget, and necessary data are some of the hindrances. The planners in Bangkok have tried to utilize Traffic Impact Assessment (TIA) in harmonizing land developments and transportation improvem...

  20. Low Impact Development Intensive Rural Construction Planning in Xu Fu Village Ningbo, China: Planning Review through Rural Resilience Perspective

    Directory of Open Access Journals (Sweden)

    Roosmayri Lovina Hermaputi

    2017-08-01

    Full Text Available Xu Fu Village Ningbo LID Intensive Rural Construction Planning is a cooperation project between Zhejiang University and Ningbo Institute of Technology which named "12th Five-Year National Science and Technology support program-the comprehensive demonstration of the key technology of the beautiful rural construction in the rapid urbanization area of the Yangtze River Delta". This plan focuses on intensive rural construction as part of rural development and construction project that applies the principles of low impact development. Xu Fu Village located in the Yangtze River Delta Region. Currently, the rural growth brings the high impact of development, as a result of rapid urbanization growth arising several issues, such as low land use efficiency, dispersed rural residence, homestead occupies more, rural roads covering over, etc. Meanwhile, Xu Fu village wishes to develop its tourism potential. Thus, the intensive rural construction should be done to avoid the severe effect. The project result hopefully can improve the quality and level of rural residential planning, design, and construction; improve their living environment; save construction land and water use; and improve energy efficiency. The aim of this study is to review the Low Impact Development (LID Intensive Rural Construction in Xu Fu Village, Ningbo City through the rural resilience perspective. This paper will describe the project plan first, then review it through rural resilience perspective. This paper will elaborate the rural resilience theory and then review the rural resiliency through two parts; the first part is identifying rural resilience in rural infrastructure development based on the criteria created by Ayyob S. and Yoshiki Y. (2014, about urban resiliency criteria, and then the second part is reviewing Xu Fu Village resilience through Arup Resilience Qualities (2012, considering three rural resilience domain (economy, ecology, and cultural.

  1. The impact of curricula and lesson planning in the teaching process

    Directory of Open Access Journals (Sweden)

    Majlinda Lika

    2017-03-01

    Full Text Available Lesson planning is at the core of teaching. It allows teachers to create an orientation path in the process of teaching, taking into consideration, many elements such as, students’ styles of learning, previous knowledge, types of intelligences, interests etc. Effective curricula plans are characterized by principles of coherence, flexibility, integration of knowledge etc. Effective lesson plans strongly rely on previous information gathered through different forms of assessment, and provide inclusive opportunities for every student. This paper will show how planning affects teaching and the quality of learning. First, a review of the literature will represent the importance of flexible planning and incorporation of differentiated elements of planning that ensure inclusive opportunities of learning for all students. Second, there will be a detailed analysis of findings taken by 25 full school inspections practices on the field of “lesson planning”. This part of the study will specify the planning difficulties the teachers face and how this affects the process of teaching and learning. Third, benefits of lesson plans that rely on good assessment practices and integrate differentiated instruction according to students' needs will be discussed as ways of helping teachers adjust lesson plans to overcome their planning difficulties. Findings indicate that teachers design lesson plans that do not rely on good assessment practices. Lesson plans are not flexible enough to respond and satisfy the needs of all categories of students, impacting that way the quality of instruction and learning. The paper will serve teachers to review their planning approaches and integrate elements of differentiated instruction as an organic part of the process, responding to traits and uniqueness students represent.

  2. Monitoring and Modeling the Impact of Grazers Using Visual, Remote and Traditional Field Techniques

    Science.gov (United States)

    Roadknight, C. M.; Marshall, I. W.; Rose, R. J.

    2009-04-01

    The relationship between wild and domestic animals and the landscape they graze upon is important to soil erosion studies because they are a strong influence on vegetation cover (a key control on the rate of overland flow runoff), and also because the grazers contribute directly to sediment transport via carriage and indirectly by exposing fresh soil by trampling and burrowing/excavating. Quantifying the impacts of these effects on soil erosion and their dependence on grazing intensity, in complex semi-natural habitats has proved difficult. This is due to lack of manpower to collect sufficient data and weak standardization of data collection between observers. The advent of cheaper and more sophisticated digital camera technology and GPS tracking devices has lead to an increase in the amount of habitat monitoring information that is being collected. We report on the use of automated trail cameras to continuously capture images of grazer (sheep, rabbits, deer) activity in a variety of habitats at the Moor House nature reserve in northern England. As well as grazer activity these cameras also give valuable information on key climatic soil erosion factors such as snow, rain and wind and plant growth and thus allow the importance of a range of grazer activities and the grazing intensity to be estimated. GPS collars and more well established survey methods (erosion monitoring, dung counting and vegetation surveys) are being used to generate a detailed representation of land usage and plan camera siting. This paper describes the data collection techniques, outlines the quantitative and qualitative data collected and proposes online and offline systems that can reduce the data processing time and increase focus on important subsets in the collected data. We also present a land usage model that estimates grazing intensity, grazer behaviours and their impact on soil coverage at sites where cameras have not been deployed, based on generalising from camera sites to other

  3. Application for verification of monitor units of the treatment planning system; Aplicacion para la verificacion de unidades monitor del sistema de planificacion de tratamientos

    Energy Technology Data Exchange (ETDEWEB)

    Suero Rodrigo, M. A.; Marques Fraguela, E.

    2011-07-01

    Current estimates algorithms achieve acceptable degree of accuracy. However, operate on the basis of un intuitive models. It is therefore necessary to verify the calculation of monitor units of the treatment planning system (PTS) with those obtained by other independent formalisms. To this end, we have developed an application based on factorization formalism that automates the calculation of dose.

  4. Indicators and protocols for monitoring impacts of formal and informal trails in protected areas

    Science.gov (United States)

    Marion, Jeffrey L.; Leung, Yu-Fai

    2011-01-01

    Trails are a common recreation infrastructure in protected areas and their conditions affect the quality of natural resources and visitor experiences. Various trail impact indicators and assessment protocols have been developed in support of monitoring programs, which are often used for management decision-making or as part of visitor capacity management frameworks. This paper reviews common indicators and assessment protocols for three types of trails, surfaced formal trails, unsurfaced formal trails, and informal (visitor-created) trails. Monitoring methods and selected data from three U.S. National Park Service units are presented to illustrate some common trail impact indicators and assessment options.

  5. Monitoring the Environmental Impact of TiO2 Nanoparticles Using a Plant-Based Sensor Network

    Science.gov (United States)

    Lenaghan, Scott C.; Li, Yuanyuan; Zhang, Hao; Burris, Jason N.; Stewart, C. Neal; Parker, Lynne E.; Zhang, Mingjun

    2016-01-01

    The increased manufacturing of nanoparticles for use in cosmetics, foods, and clothing necessitates the need for an effective system to monitor and evaluate the potential environmental impact of these nanoparticles. The goal of this research was to develop a plant-based sensor network for characterizing, monitoring, and understanding the environmental impact of TiO2 nanoparticles. The network consisted of potted Arabidopsis thaliana with a surrounding water supply, which was monitored by cameras attached to a laptop computer running a machine learning algorithm. Using the proposed plant sensor network, we were able to examine the toxicity of TiO2 nanoparticles in two systems: algae and terrestrial plants. Increased terrestrial plant growth was observed upon introduction of the nanoparticles, whereas algal growth decreased significantly. The proposed system can be further automated for high-throughput screening of nanoparticle toxicity in the environment at multiple trophic levels. The proposed plant-based sensor network could be used for more accurate characterization of the environmental impact of nanomaterials. PMID:28458617

  6. Ethnic differentials of the impact of Family Planning Program on contraceptive use in Nepal

    Directory of Open Access Journals (Sweden)

    Sharad Kumar Sharma

    2011-12-01

    Full Text Available There is wide variation of family planning services use among ethnic groups in Nepal. Despite three decades of implementation the need for family planning services is substantially unmet (25Š, and there have been no systematic studies evaluating the impact of the family planning program. This study pooled data from nationally representative surveys conducted in 1996, 2001, and 2006. Multilevel logistic regression analysis of 23,381 married women of reproductive age nested within 764 clusters indicated that Muslims, Janjatis, and Dalits were significantly less likely to use contraceptives than Brahmins and Chhetries (OR=0.27, 0.88 and 0.82 respectively. The odds of using contraceptives by the Newar were higher than the odds for Brahmins and Chhetries, although it was not significant. Exposure of women to family planning messages through health facilities, family planning workers, radio, and television increased the odds of using modern contraceptives. However, the impact of family planning information on contraceptive use varied according to ethnicity. We also found that modern contraceptive use varied significantly across the clusters, and the cluster-level indicators, such as mean age at marriage, mean household asset score, percentage of women with secondary education, and percentage of women working away from home, were important in explaining this.

  7. 40 CFR 75.53 - Monitoring plan.

    Science.gov (United States)

    2010-07-01

    ... monitoring system under subpart E of this part, including a change in the automated data acquisition and... by boiler, fuel type start and end dates, primary/secondary/emergency/startup fuel indicator, and, if... excepted monitoring system (e.g., fuel flowmeter, data acquisition and handling system), including: (A...

  8. 77 FR 53908 - Winter Use Plan, Supplemental Draft Environmental Impact Statement, Yellowstone National Park

    Science.gov (United States)

    2012-09-04

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-IMRO-YELL-11188; 2310-0070-422] Winter Use... comment period on the Draft Supplemental Environmental Impact Statement (Draft SEIS) for a Winter Use Plan... online at http://parkplanning.nps.gov/YELL (click on the link to the 2012 Supplemental Winter Use Plan...

  9. Closure plan for the proposed Millennium Project

    International Nuclear Information System (INIS)

    Tuttle, S.; Sisson, R.

    1999-01-01

    A $2.2 billion expansion of the current oil sands operation has been proposed by Suncor Energy Inc. The expansion would more than double the productive capacity of the present facility. As part of the application for this expansion, called Project Millennium, a comprehensive closure plan has been developed and filed by the Corporation. The Plan includes a systematic evaluation of the area to be developed, a description of the development activities planned, and the goals and objectives of the Corporation in re-establishing the landforms and ecosystems concurrently with running the operation. The Plan envisages surface contouring as early as practicable during the mine development, soil reconstruction, and re-establishment of vegetation, surface drainage and wetlands. The Corporation undertakes to monitor the performance of the reclaimed areas based on landform performance, the impact of chemical constituents on the landscape and ecosystem sustainability. An annual monitoring report assessing herbaceous vegetation growth, major species composition, tree and shrub survival and growth rate, groundwater conditions, amount of precipitation, the utility of constructed wetlands for treatment of reclamation area seepage and runoff waters, and wildlife population changes, will be prepared annually. A future research program associated with the Reclamation and Closure Plan will also examine the effectiveness of the reclamation drainage system as fish habitat, and the potential of the proposed end-pit lake to provide a viable aquatic ecosystem. 8 refs., 2 figs

  10. Addendum to Environmental Monitoring Plan, Nevada Test Site and Support Facilities; Addendum 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-01

    This 1993 Addendum to the ``Environmental Monitoring Plan Nevada Test Site and Support Facilities -- 1991,`` Report No. DOE/NV/10630-28 (EMP) applies to the US Department of Energy`s (DOE`s) operations on the Continental US (including Amchitka Island, Alaska) that are under the purview of the DOE Nevada Operations Office (DOE/NV). The primary purpose of these operations is the conduct of the nuclear weapons testing program for the DOE and the Department of Defense. Since 1951, these tests have been conducted principally at the Nevada Test Site (NTS), which is located approximately 100 miles northwest of Las Vegas, Nevada. In accordance with DOE Order 5400.1, this 1993 Addendum to the EMP brings together, in one document, updated information and/or new sections to the description of the environmental activities conducted at the NTS by user organizations, operations support contractors, and the US Environmental Protection Agency (EPA) originally published in the EMP. The EPA conducts both the offsite environmental monitoring program around the NTS and post-operational monitoring efforts at non-NTS test locations used between 1961 and 1973 in other parts of the continental US. All of these monitoring activities are conducted under the auspices of the DOE/NV, which has the stated policy of conducting its operations in compliance with both the letter and the spirit of applicable environmental statutes, regulations, and standards.

  11. 76 FR 78942 - Draft Environmental Impact Statement and Proposed Vernal Pool Habitat Conservation Plan for the...

    Science.gov (United States)

    2011-12-20

    ... activities associated with urban development activities. We also announce plans for a public scoping meeting... planning area and their possible impacts on the species; 5. The presence of archeological sites, buildings...

  12. Assessing the impact of the U.S. Endangered Species Act recovery planning guidelines on managing threats for listed species.

    Science.gov (United States)

    Troyer, Caitlin M; Gerber, Leah R

    2015-10-01

    The Endangered Species Act (ESA) of the United States was enacted in 1973 to prevent the extinction of species. Recovery plans, required by 1988 amendments to the ESA, play an important role in organizing these efforts to protect and recover species. To improve the use of science in the recovery planning process, the Society for Conservation Biology (SCB) commissioned an independent review of endangered species recovery planning in 1999. From these findings, the SCB made key recommendations for how management agencies could improve the recovery planning process, after which the U.S. Fish and Wildlife Service and the National Marine Fisheries Service redrafted their recovery planning guidelines. One important recommendation called for recovery plans to make threats a primary focus, including organizing and prioritizing recovery tasks for threat abatement. We sought to determine the extent to which results from the SCB study were incorporated into these new guidelines and whether the SCB recommendations regarding threats manifested in recovery plans written under the new guidelines. Recovery planning guidelines generally incorporated the SCB recommendations, including those for managing threats. However, although recent recovery plans have improved in their treatment of threats, many fail to adequately incorporate threat monitoring. This failure suggests that developing clear guidelines for monitoring should be an important priority in improving ESA recovery planning. © 2015 Society for Conservation Biology.

  13. Computational framework for risk-based planning of inspections, maintenance, and condition monitoring using discrete Bayesian networks

    DEFF Research Database (Denmark)

    Nielsen, Jannie Sønderkær; Sørensen, John Dalsgaard

    2018-01-01

    This paper presents a computational framework for risk-based planning of inspections and repairs for deteriorating components. Two distinct types of decision rules are used to model decisions: simple decision rules that depend on constants or observed variables (e.g. inspection outcome...... expecte d life-cycle costs. For advanced decision rules, simulations are performed to estimate the expected costs, and dBNs are used within the simulations for decision-making. Information from inspections and condition monitoring are included if available. An example in the paper demonstrates...... the framework and the implemented strategies and decision rules, including various types of condition-based maintenance. The strategies using advanced decision rules lead to reduced costs compared to the simple decision rules when condition monitoring is applied, and the value of condition monitoring...

  14. Evaluating impacts of energy prices release on urban planning of Iran

    Energy Technology Data Exchange (ETDEWEB)

    Babaei Aghdam, Feridoun [Mohaghegh Ardabili University (Iran, Islamic Republic of)], email: Fbabei@uma.ac.ir, email: freydoun2001@yahoo.com

    2011-07-01

    The Parliament of Iran adopted a subsidy reform plan in January, 2010. This reform constitutes one of the most significant changes to Iran's economy in the last 50 years, as it aims to replace subsidies on food and energy with social assistance. This will have important effects on the sectors consuming the most energy such as transport, buildings, industry and agriculture. The aim of this paper is to determine both the positive and negative impacts of this reform. A review of the available information was carried out using library resources, the press and the Internet; interviews with experts were also conducted. Then field investigations were conducted and a comparative survey was done. Results of this research showed that the subsidy reform plan will result in economic, social, political and traffic benefits but will also raise socio-economic issues in urban areas. This study pointed out that the subsidy reform will have more positive than negative impacts.

  15. The rapid atmospheric monitoring system of the Pierre Auger Observatory

    Czech Academy of Sciences Publication Activity Database

    Abreu, P.; Aglietta, M.; Ahlers, M.; Boháčová, Martina; Chudoba, Jiří; Ebr, Jan; Mandát, Dušan; Nečesal, Petr; Nožka, Libor; Palatka, Miroslav; Pech, Miroslav; Prouza, Michael; Řídký, Jan; Schovancová, Jaroslava; Schovánek, Petr; Šmída, Radomír; Trávníček, Petr; Vícha, Jakub

    2012-01-01

    Roč. 7, č. 9 (2012), s. 1-40 ISSN 1748-0221 R&D Projects: GA TA ČR TA01010517; GA MŠk(CZ) MEB111003; GA AV ČR KJB100100904; GA MŠk LA08015; GA MŠk(CZ) LA08016 Institutional research plan: CEZ:AV0Z10100502; CEZ:AV0Z10100522 Keywords : large detector systems for particle and astroparticle physics * real-time monitoring * control and monitor systems online Subject RIV: BN - Astronomy, Celestial Mechanics, Astrophysics Impact factor: 1.869, year: 2011

  16. Master-planned in exurbia: examining the drivers and impacts of master-planned communities at the urban fringe

    Science.gov (United States)

    Jenna H. Tilt; Lee. Cerveny

    2013-01-01

    Smart growth strategies of infill and compact growth in existing suburban cities will most likely not be sufficient to absorb a new US household growth in the future. To meet housing demands and preferences, master-planned communities will continue to be built in outlying exurban areas. However, little is known about the impacts these communities may have on the...

  17. T-TY Tank Farm Interim Surface Barrier Demonstration - Vadose Zone Monitoring Plan

    International Nuclear Information System (INIS)

    Zhang, Z.F.; Strickland, Christopher E.; Field, Jim G.; Parker, Danny L.

    2010-01-01

    The Hanford Site has 149 underground single-shell tanks that store hazardous radioactive waste. Many of these tanks and their associated infrastructure (e.g., pipelines, diversion boxes) have leaked. Some of the leaked waste has entered the groundwater. The largest known leak occurred from the T-106 Tank of the 241-T Tank Farm in 1973. Five tanks are assumed to have leaked in the TY Farm. Many of the contaminants from those leaks still reside within the vadose zone within the T and TY Tank Farms. The Department of Energy's Office of River Protection seeks to minimize the movement of these contaminant plumes by placing interim barriers on the ground surface. Such barriers are expected to prevent infiltrating water from reaching the plumes and moving them further. The soil water regime is monitored to determine the effectiveness of the interim surface barriers. Soil-water content and water pressure are monitored using off-the-shelf equipment that can be installed by the hydraulic hammer technique. Four instrument nests were installed in the T Farm in fiscal year (FY) 2006 and FY2007; two nests were installed in the TY Farm in FY2010. Each instrument nest contains a neutron probe access tube, a capacitance probe, and four heat-dissipation units. A meteorological station has been installed at the north side of the fence of the T Farm. This document summarizes the monitoring methods, the instrument calibration and installation, and the vadose zone monitoring plan for interim barriers in T farm and TY Farm.

  18. Demonstration of mobile radiation monitoring methodology for quick assessment of radiological impact of Mumbai City Using road, rail and sea routes

    International Nuclear Information System (INIS)

    Chatterjee, M.K.; Divkar, J.K.; Singh, Rajvir; Pradeepkumar, K.S.; Sharma, D.N.

    2008-01-01

    The study of background radiation levels by suitable mobile monitoring methodology through different routes (road, rail and sea) with the help of state of the art monitoring systems has been initiated with an objective to demonstrate the effectiveness of monitoring methodologies for quick radiological impact assessment during any radiological emergency and to detect the presence of orphan source(s), if any. The other objective was to establish a reliable base line data on the background radiation levels. The study was carried out in Mumbai city through different available routes. Mumbai is a densely populated city and everyday millions of commuters are crossing across the city using rail and road routes. In case of any unwarned radiological emergency in public domain, a large section of people of the city may get concerned of radioactive contamination/ high radiation exposure. In such scenario, environmental radiation monitoring and quick assessment of contamination in public domain will be a challenging task for the civil authorities. The monitoring techniques used for quick radiological impact assessment and the established base line dose rate data of Mumbai city will be very useful for planning counter measures, if required. During mobile monitoring programme of this highly populated city, the monitoring routes, selection and placement of different monitoring instruments/system within the mobile platform, data acquisition time of the respective monitoring equipments, speed of mobile monitoring station etc were optimized. State-of-the-art systems like Portable Mobile Gamma Spectrometry System (PMGSS), Compact Radiation Monitoring System integrated with GPS, Gammatracers, Portable low/high range survey meters and hand held spectrometers were used. The average of the dose rates recorded during monitoring through road routes and railway routes of Mumbai city were 60±10 nGy.h -1 and 65±15 nGy.h -1 respectively, which are attributable to terrestrial and cosmic

  19. Integration of health into urban spatial planning through impact assessment: Identifying governance and policy barriers and facilitators

    International Nuclear Information System (INIS)

    Carmichael, Laurence; Barton, Hugh; Gray, Selena; Lease, Helen; Pilkington, Paul

    2012-01-01

    This article presents the results of a review of literature examining the barriers and facilitators in integrating health in spatial planning at the local, mainly urban level, through appraisals. Our literature review covered the UK and non UK experiences of appraisals used to consider health issues in the planning process. We were able to identify four main categories of obstacles and facilitators including first the different knowledge and conceptual understanding of health by different actors/stakeholders, second the types of governance arrangements, in particular partnerships, in place and the political context, third the way institutions work, the responsibilities they have and their capacity and resources and fourth the timeliness, comprehensiveness and inclusiveness of the appraisal process. The findings allowed us to draw some lessons on the governance and policy framework regarding the integration of health impact into spatial planning, in particular considering the pros and cons of integrating health impact assessment (HIA) into other forms of impact assessment of spatial planning decisions such as environmental impact assessment (EIA) and strategic environment assessment (SEA). In addition, the research uncovered a gap in the literature that tends to focus on the mainly voluntary HIA to assess health outcomes of planning decisions and neglect the analysis of regulatory mechanisms such as EIA and SEA. - Highlights: ► Governance and policy barriers and facilitators to the integration of health into urban planning. ► Review of literature on impact assessment methods used across the world. ► Knowledge, partnerships, management/resources and processes can impede integration. ► HIA evaluations prevail uncovering research opportunities for evaluating other techniques.

  20. Adaptive Management Plan for Sensitive Plant Species on the Nevada Test Site

    International Nuclear Information System (INIS)

    Wills, C. A.

    2001-01-01

    The Nevada Test Site supports numerous plant species considered sensitive because of their past or present status under the Endangered Species Act and with federal and state agencies. In 1998, the U.S. Department of Energy, Nevada Operation Office (DOE/NV) prepared a Resource Management Plan which commits to protects and conserve these sensitive plant species and to minimize accumulative impacts to them. This document presents the procedures of a long-term adaptive management plan which is meant to ensure that these goals are met. It identifies the parameters that are measured for all sensitive plant populations during long-term monitoring and the adaptive management actions which may be taken if significant threats to these populations are detected. This plan does not, however, identify the current list of sensitive plant species know to occur on the Nevada Test Site. The current species list and progress on their monitoring is reported annually by DOE/NV in the Resource Management Plan

  1. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for ∼ 4 years after completion of the baseline monitoring

  2. Environmental Monitoring Plan for Waste Area Grouping 6 at Oak Ridge National Laboratory, Oak Ridge, Tennessee

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This document presents the Environmental Monitoring Plan (EMP) for Waste Area Grouping (WAG) 6 at the Oak Ridge National Laboratory (ORNL). Based on the results of the Resource Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and on subsequent discussions with regulators, a decision was made to defer implementing source control remedial measures at the WAG. The alternative selected to address the risks associated with WAG 6 involves maintenance of site access controls prevent public exposure to on-site contaminants, continued monitoring of contaminant releases determine if source control measures are required, and development of technologies that could support the final remediation of WAG 6. Although active source control measures are not being implemented at WAG 6, environmental monitoring is necessary to ensure that any potential changes in contaminant release from the WAG are identified early enough to take appropriate action. Two types of environmental monitoring will be conducted: baseline monitoring and annual routine monitoring. The baseline monitoring will be conducted to establish the baseline contaminant release conditions at the WAG, confirm the site-related chemicals of concern (COCs), and gather data to confirm the site hydrologic model. The baseline monitoring is expected to begin in 1994 and last for 12--18 months. The annual routine monitoring will consist of continued sampling and analyses of COCs to determine off-WAG contaminant flux and risk, identify mills in releases, and confirm the primary contributors to risk. The annual routine monitoring will continue for {approximately} 4 years after completion of the baseline monitoring.

  3. Monitoring plan for borehole logging at 216-Z-1A Tile Field, 216-Z-9 Trench, and 216-Z-12 Crib

    International Nuclear Information System (INIS)

    Horton, D.G.

    1998-04-01

    This plan describes the fiscal year 1998 vadose monitoring of three inactive, liquid waste disposal facilities associated with the Plutonium Finishing Plant (Z-Plant): the 216-Z-1A Tile Field, the 216-Z-9 Trench, and the 216-Z-12 Crib. Monitoring will consist of spectral gamma ray logging of 21 boreholes. This plan describes the physical characteristics of the facilities, their operational histories, the subsurface geology and known contamination distribution at each facility. The plan then describes the specific monitoring to be done including the boreholes to be logged, the methods of data acquisition, data reduction, and data evaluation, and finally, the quality control, data management and data reporting for this effort. The three liquid waste disposal facilities at the Z Plant were chosen to be monitored because they were identified as containing some of the most significant sources of radioactive contamination in the Hanford vadose zone. Johnson's analysis was based on the relative hazard obtained by combining curie quantities disposed to the facilities with appropriate health risk standards. The basic question to be addressed by this logging activity addresses the configuration of subsurface contamination since it was last measured. Historical data from the 216-Z-1A Tile Field, the 216-Z-9 Trench, and the 216-Z-12 Crib form the baseline for comparisons to answer this question

  4. Strategic Planning Process and Organizational Structure: Impacts, Confluence and Similarities

    Directory of Open Access Journals (Sweden)

    Dyogo Felype Neis

    2017-01-01

    Full Text Available This article aims to analyze the relationship between the strategic planning process and organizational structure in the reality of a complex organization: the Public Prosecutor’s Office of Santa Catarina (MPSC. The research is set by the single case study research strategy and data were collected through the following instruments: bibliographical research, documentary research, semi-structured interviews and systematic observation. The conclusion indicates that the phases of the strategic planning process influence and are influenced by the elements of the organizational structure and highlights the confluences, the impacts and similarities between the stages of formulation and implementation of the strategic process with the various constituent elements of the organizational structure.

  5. Scientific and technological basis for maintenance optimization, planning, testing and monitoring for NPP with WWER

    International Nuclear Information System (INIS)

    Kovrizhkin, Yu.L.; Skalozubov, V.I.; Kochneva, V.Yu.

    2009-01-01

    The main results of the developments in the sphere of NPPs with WWER production efficiency increasing by the way of the maintenance optimization planning, testing and monitoring of the equipment and systems are shown. The attention is paid to the metal control during maintenance period of Power Unit. The realization methods of the transition concept at the repair according to the technical condition are resulted

  6. Topological clustering as a tool for planning water quality monitoring in water distribution networks

    DEFF Research Database (Denmark)

    Kirstein, Jonas Kjeld; Albrechtsen, Hans-Jørgen; Rygaard, Martin

    2015-01-01

    ) identify steady clusters for a part of the network where an actual contamination has occurred; (2) analyze this event by the use of mesh diagrams; and (3) analyze the use of mesh diagrams as a decision support tool for planning water quality monitoring. Initially, the network model was divided...... into strongly and weakly connected clusters for selected time periods and mesh diagrams were used for analysing cluster connections in the Nørrebro district. Here, areas of particular interest for water quality monitoring were identified by including user-information about consumption rates and consumers...... particular sensitive towards water quality deterioration. The analysis revealed sampling locations within steady clusters, which increased samples' comparability over time. Furthermore, the method provided a simplified overview of water movement in complex distribution networks, and could assist...

  7. Baseline and Postremediation Monitoring Program Plan for the Lower East Fork Poplar Creek operable unit, Oak Ridge, Tennessee

    International Nuclear Information System (INIS)

    1996-04-01

    This report was prepared in accordance with CERCLA requirements to present the plan for baseline and postremediation monitoring as part of the selected remedy. It provides the Environmental Restoration Program with information about the requirements to monitor for soil and terrestrial biota in the Lower East Fork Poplar Creek (LEFPC) floodplain; sediment, surface water, and aquatic biota in LEFPC; wetland restoration in the LEFPC floodplain; and human use of shallow groundwater wells in the LEFPC floodplain for drinking water. This document describes the monitoring program that will ensure that actions taken under Phases I and II of the LEFPC remedial action are protective of human health and the environment

  8. Environmental monitoring handbook for coal conversion facilities

    Energy Technology Data Exchange (ETDEWEB)

    Salk, M.S.; DeCicco, S.G. (eds.)

    1978-05-01

    The primary objectives of the Department of Energy's (DOE) coal conversion program are to demonstrate the environmental acceptability, technical feasibility, and economic viability of various technologies for gaseous, liquid, and solid fuels from coal. The Environmental Monitoring Handbook for Coal Conversion Facilities will help accomplish the objective of environmental acceptability by guiding the planning and execution of socioeconomic and environmental monitoring programs for demonstration facilities. These programs will provide information adequate to (1) predict, insofar as is possible, the potential impacts of construction and operation of a coal conversion plant, (2) verify the occurrence of these or any other impacts during construction and operation, (3) determine the adequacy of mitigating measures to protect the environment, (4) develop effluent source terms for process discharges, and (5) determine the effectiveness of pollution control equipment. Although useful in a variety of areas, the handbook is intended primarily for contractors who, as industrial partners with DOE, are building coal conversion plants. For the contractor it is a practical guide on (1) the methodology for developing site- and process-specific environmental monitoring programs, (2) state-of-the-art sampling and analytical techniques, and (3) impact analyses.To correspond to the phases of project activity, the subject matter is divided into four stages of monitoring: (1) a reconnaissance or synoptic survey, (2) preconstruction or baseline, (3) construction, and (4) operation, including process monitoring (prepared by Radian Corp., McLean, Va.). For each stage of monitoring, guidelines are given on socioeconomics, aquatic and terrestrial ecology, air quality and meteorology, surface and groundwater quality, geohydrology and soil survey, and surface water hydrology.

  9. The Impact of Reproductive Health Legislation on Family Planning Clinic Services in Texas

    Science.gov (United States)

    Hopkins, Kristine; Aiken, Abigail R. A.; Stevenson, Amanda; Hubert, Celia; Grossman, Daniel; Potter, Joseph E.

    2015-01-01

    We examined the impact of legislation in Texas that dramatically cut and restricted participation in the state’s family planning program in 2011 using surveys and interviews with leaders at organizations that received family planning funding. Overall, 25% of family planning clinics in Texas closed. In 2011, 71% of organizations widely offered long-acting reversible contraception; in 2012–2013, only 46% did so. Organizations served 54% fewer clients than they had in the previous period. Specialized family planning providers, which were the targets of the legislation, experienced the largest reductions in services, but other agencies were also adversely affected. The Texas experience provides valuable insight into the potential effects that legislation proposed in other states may have on low-income women’s access to family planning services. PMID:25790404

  10. Impact of climate change on operations and planning of Hydro-Quebec's generation system

    International Nuclear Information System (INIS)

    Raymond, M.P.; Houle, B.; Robert, S.

    2008-01-01

    Studies that are underway at OURANOS indicate that some of the probable climate change scenarios in the coming years will have an effect on Quebec's watersheds hydrology and on temperatures. For Hydro-Quebec, who draws more than 95% of its generation from hydraulic resources and whose electricity loads depend pretty much on temperatures, such climate changes will definitely have a significant impact on many aspects of the planning and operations of its system. Our presentation will be divided into three parts. First, to bridge the gap between climate change scientists and water managers, we will present a list of the types of parameters needed from the scientists in order for the water managers to assess the impacts of climate changes on a hydroelectric system such as Hydro-Quebec's. These parameters will include changes in annual and seasonal distribution and variability of natural inflows and, most importantly, the timing of the changes in the coming years. The second part will focus on the types of adaptive decisions and strategies that will have to be taken ahead of time in order to implement the changes on a hydroelectric generation system such as Hydro-Quebec's. They will cover different areas such as generation planning, operations planning and optimization, refurbishment and replacement of infrastructures, dam safety, flood control and protection, maintenance planning and reliability. Finally, we will present more specific results of the impact of some climate change scenarios on Hydro-Quebec's overall generation system, showing differences between regions, and a case study on one of its river systems. (author)

  11. Monitoring Dosimetric Impact of Weight Loss With Kilovoltage (KV) Cone Beam CT (CBCT) During Parotid-Sparing IMRT and Concurrent Chemotherapy

    Energy Technology Data Exchange (ETDEWEB)

    Ho, Kean Fatt, E-mail: hokeanfatt@hotmail.com [Academic Radiation Oncology, The Christie NHS Foundation Trust, Manchester (United Kingdom); Marchant, Tom; Moore, Chris; Webster, Gareth; Rowbottom, Carl [North Western Medical Physics, The Christie NHS Foundation Trust, Manchester (United Kingdom); Penington, Hazel [Wade Radiotherapy Research Centre, The Christie NHS Foundation Trust, Manchester (United Kingdom); Lee, Lip; Yap, Beng; Sykes, Andrew; Slevin, Nick [Department of Clinical Oncology, The Christie NHS Foundation Trust, Manchester (United Kingdom)

    2012-03-01

    Purpose: Parotid-sparing head-and-neck intensity-modulated radiotherapy (IMRT) can reduce long-term xerostomia. However, patients frequently experience weight loss and tumor shrinkage during treatment. We evaluate the use of kilovoltage (kV) cone beam computed tomography (CBCT) for dose monitoring and examine if the dosimetric impact of such changes on the parotid and critical neural structures warrants replanning during treatment. Methods and materials: Ten patients with locally advanced oropharyngeal cancer were treated with contralateral parotid-sparing IMRT concurrently with platinum-based chemotherapy. Mean doses of 65 Gy and 54 Gy were delivered to clinical target volume (CTV)1 and CTV2, respectively, in 30 daily fractions. CBCT was prospectively acquired weekly. Each CBCT was coregistered with the planned isocenter. The spinal cord, brainstem, parotids, larynx, and oral cavity were outlined on each CBCT. Dose distributions were recalculated on the CBCT after correcting the gray scale to provide accurate Hounsfield calibration, using the original IMRT plan configuration. Results: Planned contralateral parotid mean doses were not significantly different to those delivered during treatment (p > 0.1). Ipsilateral and contralateral parotids showed a mean reduction in volume of 29.7% and 28.4%, respectively. There was no significant difference between planned and delivered maximum dose to the brainstem (p = 0.6) or spinal cord (p = 0.2), mean dose to larynx (p = 0.5) and oral cavity (p = 0.8). End-of-treatment mean weight loss was 7.5 kg (8.8% of baseline weight). Despite a {>=}10% weight loss in 5 patients, there was no significant dosimetric change affecting the contralateral parotid and neural structures. Conclusions: Although patient weight loss and parotid volume shrinkage was observed, overall, there was no significant excess dose to the organs at risk. No replanning was felt necessary for this patient cohort, but a larger patient sample will be investigated

  12. 78 FR 13081 - Draft Environmental Impact Statement for General Management Plan, Everglades National Park, Florida

    Science.gov (United States)

    2013-02-26

    ... visitor use in the Park. The GMP will provide updated management direction for the entire park. The EEWS....YP0000] Draft Environmental Impact Statement for General Management Plan, Everglades National Park... the General Management Plan (GMP) and East Everglades Wilderness Study (EEWS) for Everglades National...

  13. Tritium waste management on the La Hague AREVA NC site: associated impact and monitoring

    International Nuclear Information System (INIS)

    Devin, P.; Deguette, H.

    2009-01-01

    The authors propose an analysis of tritium behaviour in the nuclear fuel processed in the AREVA NC plant in La Hague, of its presence in the plant and in its wastes, and of the impact of these wastes and the tritium monitoring in the environment. First, they present the AREVA NC plant and evoke the legal context concerning the waste management. They report and discuss the analysis of the presence and behaviour of tritium in irradiated fuel, of its behaviour during spent fuel processing, the evolution of tritium releases (legal limitations, evolutions since 1992), of measurement of activity in effluents, and discuss a study of possible reductions of tritium releases by La Hague plants (mainly in sea waters). They also report the computational assessment of the dosimetric impact of tritium on neighbouring population. They describe how the presence of tritium in the environment is monitored within the annual radioactivity monitoring programme

  14. Adaptive social impact management for conservation and environmental management.

    Science.gov (United States)

    Kaplan-Hallam, Maery; Bennett, Nathan J

    2018-04-01

    Concerns about the social consequences of conservation have spurred increased attention the monitoring and evaluation of the social impacts of conservation projects. This has resulted in a growing body of research that demonstrates how conservation can produce both positive and negative social, economic, cultural, health, and governance consequences for local communities. Yet, the results of social monitoring efforts are seldom applied to adaptively manage conservation projects. Greater attention is needed to incorporating the results of social impact assessments in long-term conservation management to minimize negative social consequences and maximize social benefits. We bring together insights from social impact assessment, adaptive management, social learning, knowledge coproduction, cross-scale governance, and environmental planning to propose a definition and framework for adaptive social impact management (ASIM). We define ASIM as the cyclical process of monitoring and adaptively managing social impacts over the life-span of an initiative through the 4 stages of profiling, learning, planning, and implementing. We outline 14 steps associated with the 4 stages of the ASIM cycle and provide guidance and potential methods for social-indicator development, predictive assessments of social impacts, monitoring and evaluation, communication of results, and identification and prioritization of management responses. Successful ASIM will be aided by engaging with best practices - including local engagement and collaboration in the process, transparent communication of results to stakeholders, collective deliberation on and choice of interventions, documentation of shared learning at the site level, and the scaling up of insights to inform higher-level conservation policies-to increase accountability, trust, and perceived legitimacy among stakeholders. The ASIM process is broadly applicable to conservation, environmental management, and development initiatives at various

  15. The impact of flexible benefits plans on job satisfaction, organizational commitment and turnover intentions.

    Science.gov (United States)

    Heshizer, B

    1994-01-01

    This study assesses the dimensionality of employee attitudes toward flexible benefits plans and the impact of these plans on measures of job satisfaction, commitment and turnover intent. The study points to the need for more work on the measurement of employee attitudes toward flexible benefits and on the nomological framework of flexible benefits as a construct in compensation research.

  16. Environmental monitoring at CERN: present status and future plans for the Large Hadron Collider (LHC)

    International Nuclear Information System (INIS)

    Hoefert, M.; Stevenson, G.R.; Vojtyla, P.; Wittekind, D.

    1998-01-01

    The present radiological impact of CERN on the environment is negligible. It is assessed that this will also be the case after the Large Hadron Collider starts operation in 2005. Nevertheless, the environmental monitoring programme at CERN will be further extended, so as to demonstrate that the Organization fully complies with standards and limits for environmental impact of nuclear installations as laid down by authorities in the CERN host countries. (P.A.)

  17. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP`s disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II.

  18. Waste Isolation Pilot Plant disposal phase supplemental environmental impact statement. Implementation plan

    International Nuclear Information System (INIS)

    1996-05-01

    The Implementation Plan for the Waste Isolation Pilot Plant Disposal Phase Supplemental Environmental Impact Statement (SEIS-II) has two primary purposes: (1) To report on the results of the scoping process (2) To provide guidance for preparing SEIS-II SEIS-II will be the National Environmental Policy Act (NEPA) review for WIPP's disposal phase. Chapter 1 of this plan provides background on WIPP and this NEPA review. Chapter 2 describes the purpose and need for action by the Department of Energy (hereafter DOE or the Department), as well as a description of the Proposed Action and alternatives being considered. Chapter 3 describes the work plan, including the schedule, responsibilities, and planned consultations with other agencies and organizations. Chapter 4 describes the scoping process, presents major issues identified during the scoping process, and briefly indicates how issues will be addressed in SEIS-II

  19. Groundwater Monitoring and Tritium-Tracking Plan for the 200 Area State-Approved Land Disposal Site

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, D. Brent

    2000-08-31

    The 200 Area State-Approved Land Disposal Site (SALDS) is a drainfield which receives treated wastewater, occasionally containing high levels of tritium from treatment of Hanford Site liquid wastes. Only the SALDS proximal wells (699-48-77A, 699-48-77C, and 699-48-77D) have been affected by tritium from the facility thus far; the highest activity observed (2.1E+6 pCi/L) occurred in well 699-48-77D in February 1998. Analytical results of groundwater geochemistry since groundwater monitoring began at the SALDS indicate that all constituents with permit enforcement limits have been below those limits with the exception of one measurement of total dissolved solids (TDS) in 1996. The revised groundwater monitoring sampling and analysis plan eliminates chloroform, acetone, tetrahydrofuran, benzene, and ammonia as constituents. Replicate field measurements will replace laboratory measurements of pH for compliance purposes. A deep companion well to well 699-51-75 will be monitored for tritium deeper in the uppermost aquifer.

  20. Modeling of Global BEAM Structure for Evaluation of MMOD Impacts to Support Development of a Health Monitoring System

    Science.gov (United States)

    Lyle, Karen H.; Vassilakos, Gregory J.

    2015-01-01

    This report summarizes the initial modeling of the global response of the Bigelow Expandable Activity Module (BEAM) to micrometeorite and orbital debris(MMOD) impacts using a structural, nonlinear, transient dynamic, finite element code. These models complement the on-orbit deployment of the Distributed Impact Detection System (DIDS) to support structural health monitoring studies. Two global models were developed. The first focused exclusively on impacts on the soft-goods (fabric-envelop) portion of BEAM. The second incorporates the bulkhead to support understanding of bulkhead impacts. These models were exercised for random impact locations and responses monitored at the on-orbit sensor locations. The report concludes with areas for future study.

  1. Environmental impacts by running an osmotic power plan

    Energy Technology Data Exchange (ETDEWEB)

    Staalstroem, A.; Gitmark, J.

    2012-07-01

    The possible environmental impact by running an osmotic power plant is assessed by using results from monitoring of the prototype plant at Tofte in the Oslofjord, where a water flow of approximately 13 L/s of freshwater is mixed with 20 L/s of saltwater and discharged at 2 m depth. The results from the biological investigations show no impact of the discharge water on the benthic communities in the area. Eutrophication effects near the discharge point are identified as the main environmental concern in an up-scaled power plant. Water samples from the saltwater intake indicate that the phosphorous concentration often is higher at 35 m depth than in the euphotic layer, and there will be a net supply of phosphorous to this layer. By diving the outlet plume below the euphotic zone, eutrophication effects as well as possible effects from use of chemicals and possible changed temperature and salinity in the surface layer is avoided. (Author)

  2. Household environmental monitoring project, volume I : main report, volume 2 : appendices

    Energy Technology Data Exchange (ETDEWEB)

    Thompson, J.; Goemans, M.; Goemans, P.C.; Wisniowski, A. [Jane Thompson Architect, Ottawa, ON (Canada); Fugler, D. [Canada Mortgage and Housing Corp., Ottawa, ON (Canada)

    2006-01-15

    Environmentally sustainable behaviour can be motivated by providing homeowners with a clear picture of their environmental impact, tangible reasons for improvement, and tailored solutions. This report presented the results of a study that established a study group of 20 households in an 85-year old community near downtown Ottawa, Ontario to test the above hypothesis. Each household completed surveys about environmental attitudes and household practices. Each household also tracked home heating, electricity and water consumption, and vehicle usage and waste generation over a monitoring period of one week. This report described the study in detail and presented the research plan and methods. It provided a review of related literature, including motivational techniques for encouraging sustainable behaviour; environmental monitoring tools including design tools, global impact assessment tools, federal environmental reduction tools and strategies; analyses of environmentally sustainable projects; and resource conservation techniques and manuals. The report also discussed the selection of the study group; development of monitoring method and forms; household monitoring; household assessment and reporting; community initiatives; and assessment of following year results. It was concluded that the research technique successfully produced reductions in environmental impact among the study group. refs., tabs., figs.

  3. Handbook to guide the measurement and monitoring of project effectiveness and impact

    Energy Technology Data Exchange (ETDEWEB)

    1986-09-15

    This handbook demonstrates the application of a tool for measuring and monitoring the impact of a development project in the Department of Quezaltenango, Guatemala. That project itself presently is a demonstration. It explores the technical feasibility and the commercial possibilities of direct geothermal heat applications to the processing of agricultural produce - with the eventual purpose of expanding agricultural exports from Guatemala. The handbook focuses on an early stage of the geothermal initiative and guides preparations for future impact measurement and monitoring of geothermal projects. Primarily, guidance is for projects in agricultural applications of geothermal heat - and basically in Quezaltenango. But the exercise and the handbook are relevant in broad outline to other, industrial applications projects as well which may be based in other departments and have immediate impact across the whole country. This handbook attempts to prepare geothermal energy planners in Guatemala for that juncture when geothermal projects can be managed by objectives. It promotes and facilitates thinking about defining specific objectives for projects that result from the demonstration at Zunil (in Quezaltenango Department); and it prompts preparations for obtaining baseline measurements and for making rational projections on the achievements of future projects.

  4. Facility effluent monitoring plan for WESF

    Energy Technology Data Exchange (ETDEWEB)

    SIMMONS, F.M.

    1999-09-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the effluent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability.

  5. Facility effluent monitoring plan for WESF

    International Nuclear Information System (INIS)

    SIMMONS, F.M.

    1999-01-01

    The FEMP for the Waste Encapsulation and Storage Facility (WESF) provides sufficient information on the WESF effluent characteristics and the efferent monitoring systems so that a compliance assessment against applicable requirements may be performed. Radioactive and hazardous material source terms are related to specific effluent streams that are in turn, related to discharge points and, finally are compared to the effluent monitoring system capability

  6. Integration of research advances in modelling and monitoring in support of WFD river basin management planning in the context of climate change.

    Science.gov (United States)

    Quevauviller, Philippe; Barceló, Damia; Beniston, Martin; Djordjevic, Slobodan; Harding, Richard J; Iglesias, Ana; Ludwig, Ralf; Navarra, Antonio; Navarro Ortega, Alícia; Mark, Ole; Roson, Roberto; Sempere, Daniel; Stoffel, Markus; van Lanen, Henny A J; Werner, Micha

    2012-12-01

    The integration of scientific knowledge about possible climate change impacts on water resources has a direct implication on the way water policies are being implemented and evolving. This is particularly true regarding various technical steps embedded into the EU Water Framework Directive river basin management planning, such as risk characterisation, monitoring, design and implementation of action programmes and evaluation of the "good status" objective achievements (in 2015). The need to incorporate climate change considerations into the implementation of EU water policy is currently discussed with a wide range of experts and stakeholders at EU level. Research trends are also on-going, striving to support policy developments and examining how scientific findings and recommendations could be best taken on board by policy-makers and water managers within the forthcoming years. This paper provides a snapshot of policy discussions about climate change in the context of the WFD river basin management planning and specific advancements of related EU-funded research projects. Perspectives for strengthening links among the scientific and policy-making communities in this area are also highlighted. Copyright © 2012 Elsevier B.V. All rights reserved.

  7. Long-term monitoring of UK river basins: the disconnections between the timescales of hydrological processes and watershed management planning

    Science.gov (United States)

    Howden, N. J. K.; Burt, T.; Worrall, F.

    2016-12-01

    The UK has a wealth of hydrological monitoring data that has both good coverage in space since the early 1970s, and also a few locations where records have been kept continuously for almost 150 years. Such datasets offer unique opportunities for the hydrologist to consider how the concepts of stationarity, change, and definitions of "baseline" resources should be used to shape how we build models of these systems, and how we devise appropriate and sustainable watershed management strategies. In this paper we consider some of the UK's longest hydrological and biogeochemical records, to explore how long records can be used to shape such understanding and, in some cases, how they can be used to identify new modes of behaviour that need to be incorporated into management planning, from the scale of individual watersheds right up to the national scale. We also consider how key timescales of hydrological responses that are evident within the data may pose major problems for watershed management unless appropriate attention is paid to the potential impacts of processes that work over decadal timescales - much longer than sub-decadal water industry investment cycles or short-term projects for watershed management planning. We use our long-term records to show how key processes can be identified, and to illustrate how careful interpretation of shorter term records will improve decision-making for water resource management.

  8. Coordinated bird monitoring: Technical recommendations for military lands

    Science.gov (United States)

    Bart, Jonathan; Manning, Ann; Fischer, Richard; Eberly, Chris

    2012-01-01

    The Department of Defense (DoD) is subject to several rules and regulations establishing responsibilities for monitoring migratory birds. The Sikes Act requires all military installations with significant natural resources to prepare and implement Integrated Natural Resources Management Plans (INRMPs). These plans guide the conservation and long-term management of natural resources on military lands in a manner that is compatible with and sustains the military mission. An INRMP also supports compliance with all legal requirements and guides the military in fulfilling its obligation to be a good steward of public land.The management and conservation of migratory birds is addressed in installation INRMPs. The National Environmental Policy Act (NEPA) requires federal agencies to evaluate and disclose the potential environmental impacts of their proposed actions. More recently, DoD signed an MOU (http://www.dodpif.org/downloads/EO13186_MOU-DoD.pdf) for migratory birds, under Executive Order 13186, with the US Fish and Wildlife Service (USFWS) in July 2006 and a Migratory Bird Rule (http://www.dodpif.org/downloads/MigBirdFINALRule_FRFeb2007.pdf) was passed by Congress in February 2007. The Migratory Bird Rule addresses the potential impacts of military readiness activities on populations of migratory birds and establishes a process to implement conservation measures if and when a military readiness activity is expected to have a significant adverse impact on a population of migratory bird species (as determined through the NEPA process). The MOU states that for nonmilitary readiness activities, prior to initiating any activity likely to affect populations of migratory birds DoD shall (1) identify the migratory bird species likely to occur in the area of the proposed action and determine if any species of concern could be affected by the activity, and (2) assess and document, using NEPA when applicable, the effect of the proposed action on species of concern. By

  9. Plan for the long term environmental assessment of geopressured resource development in the Louisiana Gulf Coast Region

    Energy Technology Data Exchange (ETDEWEB)

    Newchurch, E.J.; Bryan, C.F.; Harrison, D.P.; Muller, R.A.; Wilcox, R.E.; Bachman, A.L.; Newman, J.P.; Cunningham, K.J.; Hilding, R.K.; Rehage, J.A.

    1978-07-15

    Results of research to develop a plan for the long-term environmental assessment of geopressured/geothermal resource development in the Louisiana Gulf Coast region are reported. An overall view of the environmental issues facing decision-makers in the area of geopressured resource development is presented, along with a plan for monitoring potential environmental impacts. Separate assessments and plans are presented for geological effects, air and water quality, ecosystem quality, and socioeconomic and cultural considerations. (JGB)

  10. Process monitoring using a Quality and Technical Surveillance Program

    International Nuclear Information System (INIS)

    Rafferty, C.A.

    1995-01-01

    The purpose of process monitoring using a Quality and Technical Surveillance Program was to help ensure manufactured clad vents sets fully met technical and quality requirements established by the manufacturer and the customer, and that line and program management were immediately alerted if any aspect of the manufacturing activities drifted out of acceptable limits. The Quality and Technical Surveillance Program provided a planned, scheduled approach to monitor key processes and documentation illuminated potential problem areas early enough to permit timely corrective actions to reverse negative trends that, if left uncorrected, could have resulted in deficient hardware. Significant schedule and cost impacts were eliminated

  11. Core monitoring with analytical model adaption

    International Nuclear Information System (INIS)

    Linford, R.B.; Martin, C.L.; Parkos, G.R.; Rahnema, F.; Williams, R.D.

    1992-01-01

    The monitoring of BWR cores has evolved rapidly due to more capable computer systems, improved analytical models and new types of core instrumentation. Coupling of first principles diffusion theory models such as applied to design to the core instrumentation has been achieved by GE with an adaptive methodology in the 3D Minicore system. The adaptive methods allow definition of 'leakage parameters' which are incorporated directly into the diffusion models to enhance monitoring accuracy and predictions. These improved models for core monitoring allow for substitution of traversing in-core probe (TIP) and local power range monitor (LPRM) with calculations to continue monitoring with no loss of accuracy or reduction of thermal limits. Experience in small BWR cores has shown that with one out of three TIP machines failed there was no operating limitation or impact from the substitute calculations. Other capabilities exist in 3D Monicore to align TIPs more accurately and accommodate other types of system measurements or anomalies. 3D Monicore also includes an accurate predictive capability which uses the adaptive results from previous monitoring calculations and is used to plan and optimize reactor maneuvers/operations to improve operating efficiency and reduce support requirements

  12. Draft Hanford Remedial Action Environmental Impact Statement and Comprehensive Land Use Plan. Volume 4 of 4

    International Nuclear Information System (INIS)

    1996-08-01

    The US Department of Energy's (DOE) is preparing this ''Hanford Site Comprehensive Land Use Plan'' (Comprehensive Plan), Appendix M to address future land uses for the Hanford Site. The DOE has integrated this land-use planning initiative with the development of the HRA-EIS to facilitate and expedite land-use and remediation decision making, reduce time and cost of remediation, and optimize the usefulness of the planning process. The HRA-EIS is being developed to evaluate the potential environmental impacts associated with remediation, create a remedial baseline for the Environmental Restoration Program, and provide a framework for future uses at the Hanford Site. This Comprehensive Plan identifies current assets and resources related to land-use planning, and provides the analysis and recommendations for future land sues and accompanying restrictions at the Hanford Site over a 50-year period. This Comprehensive Plan relies on the analysis of environmental impacts in the HRA-EIS. The National Environmental Policy Act of 1969 (NEPA) Record of Decision (ROD) issued for the HRA-EIS will be the decision process for finalization and adoption of this Comprehensive Plan. The HRA-EIS and this Comprehensive Plan will provide a basis for remediation decisions to be identified and contained in site- and area-specific Comprehensive Environmental Response, Compensation and Liability Act of 1980 ROD

  13. Coal conversion and aquatic environments: overview of impacts and strategies for monitoring. Environmental Sciences Division publication No. 1112

    Energy Technology Data Exchange (ETDEWEB)

    Roop, R. D.; Sanders, F. S.; Barnthouse, L. W.

    1977-01-01

    Impact assessment and environmental monitoring are difficult but crucial steps needed to ensure the environmentally safe development of coal conversion technologies. This paper summarizes strategies for impact assessment and monitoring developed at Oak Ridge National Laboratory for DOE's program to build demonstration facilities. Impacts on aquatic environments depend heavily on the abiotic and biotic characteristics of the site and details of facility design. Key issues include availability of water, use of ''zero-discharge'' designs, and methods of handling solid wastes. In monitoring programs emphasis is placed on (1) thorough use of existing data, (2) use of a synoptic reconnaissance survey, criteria for choosing parameters to be measured, and the search for ecologically meaningful, cost-effective methods.

  14. Individual and organizational impact of enterprises resources planning system in health care sector

    International Nuclear Information System (INIS)

    Ilyas, A.; Fiaz, M.; Tayyaba, A.

    2016-01-01

    Use of ERPS (Enterprise Resource Planning System) in health care sector has positive impacts. The purpose of this research is to find out the individual and organizational impact in health care sector. Hypotheses were postulated that the use of ERPS has positive individual and organizational impacts. A research questionnaire was used to test these hypotheses which have twelve dimensions for both impacts. This instrument was adopted from literature and self-administrated to 504 individuals with response rate of 60 percentage and only 56 percentage of questionnaires were used. The results of this study revealed that the use of ERPS has positive individual and organizational impacts. This study will help the health care organizations to find out impacts of ERPS in health care sector and also to better understand the individual and organizational impacts. (author)

  15. An analysis of potential impacts to the groundwater monitoring networks in the Central Plateau. Revision 0

    International Nuclear Information System (INIS)

    1996-01-01

    This report presents the results of an evaluation of potential impacts to the four groundwater monitoring projects operating in the Central Plateau of the Hanford Site. It specifically fulfills Milestone M-15-81A of the Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement). Milestone M-15-81A specifies the evaluation of the potential impacts to the groundwater monitoring well systems in the Central Plateau caused by the following activities: reduction of liquids discharged to soil, proposed and operational liquid treatment facilities, and proposed pump-and-treat systems. For this report, an open-quotes impactclose quotes is defined as a restriction of the ability to draw samples from a well and/or a reduction of the ability of a monitoring well to meet its intended purpose (such as the detection of contaminant seepage from a facility). Approximately 20% (74 wells) of the groundwater monitoring wells potentially will experience sampling problems by the year 2005 due to the declining water table in the Central Plateau. Reduction of discharges to the B Pond complex and operation of the Treated Effluent Disposal System will directly cause four additional wells to potentially experience sampling problems. Approximately 90 monitoring wells (35 of which are Resource Conservation and Recovery Act of 1976 [RCRA] wells) will be potentially affected by the operation of pump-and-treat systems in the 200 West Area. Most of the impacts will be caused by local changes to groundwater flow directions that will potentially reduce the ability of the RCRA well network to monitor a limited number of RCRA facilities

  16. Designing, implementing and monitoring social impact mitigation strategies: Lessons from Forest Industry Structural Adjustment Packages

    International Nuclear Information System (INIS)

    Loxton, Edwina A.; Schirmer, Jacki; Kanowski, Peter

    2013-01-01

    Social impact mitigation strategies are implemented by the proponents of policies and projects with the intent of reducing the negative, and increasing the positive social impacts of their activities, and facilitating the achievement of policy/project goals. Evaluation of mitigation strategies is critical to improving their future success and cost-effectiveness. This paper evaluates two Forest Industry Structural Adjustment Packages (FISAP) implemented in Australia in the 1990s to 2000s as part of broader policy changes that reduced access to timber from publicly owned native forests. It assesses the effectiveness of the structure, design, implementation and monitoring of the FISAPs, and highlights the interactions between these four elements and their influence on social impacts. The two FISAPs were found to be effective in terms of reducing negative impacts, encouraging positive impacts and contributing towards policy goals, although they did not mitigate negative impacts in all cases, and sometimes interacted with external factors and additional policy changes to contribute to significant short and long term negative impacts. -- Highlights: ► Mitigation strategies aim to reduce negative and enhance positive social impacts ► Mitigation strategy design, implementation, and monitoring are critical to success ► Effective mitigation enhanced the capacity of recipients to respond to change ► Mitigation strategies influenced multiple interacting positive and negative impacts ► Success required good communication, transparency, support, resources and timing

  17. Monitoring recreational impacts in wilderness of Kamchatka (on example of Kronotsky State Natural Biosphere Preserve)

    Science.gov (United States)

    Anya V. Zavadskaya

    2011-01-01

    This paper describes an assessment and monitoring program that was designed and initiated for monitoring recreational impacts in a wilderness in Kamchatka. The framework of the recreational assessment was tested through its application to a case study conducted during the summers of 2008 and 2009 in the Kronotsky State Natural Biosphere Preserve (Kamchatka peninsula,...

  18. Action plan for energy efficiency 2003-2006. A Working Group Proposal

    International Nuclear Information System (INIS)

    2003-02-01

    proposed to be launched in order to promote energy saving in transport and energy efficiency in the community structure. The Working Group also proposes considering the possibility of further strengthening building regulations. For the improvement of the information on energy saving, the Working Group proposes drawing up of a communication plan for the action plan period. The action plan proposed by the Working Group is estimated to save Finland the emission of some 4-6 million tonnes of CO 2 , depending on the fuel to be replaced, in comparison with the basic scenario for 2010. The action plan is estimated to result in a 4-6 percent reduction in the consumption of primary sources of energy in 2010 compared with a situation where no new actions were taken. The Working Group proposes setting up of a monitoring group for the implementation and monitoring of the impact of the action plan. The data obtained from monitoring will be published in connection with the monitoring of the implementation of the climate strategy. The Working Group considers that the measures proposed should be subjected to a new evaluation in connection with the national introduction of the EU scheme for emission allowance trading. (orig.)

  19. Monitoring of Sesamia nonagrioides resistance to MON 810 maize in the European Union: lessons from a long-term harmonized plan.

    Science.gov (United States)

    Farinós, Gema P; Hernández-Crespo, Pedro; Ortego, Félix; Castañera, Pedro

    2018-03-01

    Use of MON 810 maize (Zea mays), which expresses the insecticidal protein Cry1Ab from Bacillus thuringiensis (Bt maize), is a highly effective method to control Sesamia nonagrioides (Lefèbvre), a key maize pest in Mediterranean countries. Monitoring programs to assess the potential development of resistance of target pests to Bt maize are mandatory in the European Union (EU). Here we report the results of the S. nonagrioides resistance monitoring plan implemented for MON 810 maize in the EU between 2004 and 2015 and reassess the different components of this long-term harmonized plan. No major shifts in the susceptibility of S. nonagrioides to the Cry1Ab protein have occurred over time. The reassessment of this long-term program has identified some practical and technical constraints, allowing us to provide specific recommendations for improvement: use reference strains instead of susceptibility baselines as comparators for field-collected populations; shift from dose-response bioassays to diagnostic concentrations; and focus monitoring on areas with high adoption rates, such as the Ebro basin in Spain. There are no signs of field resistance of S. nonagrioides to the Cry1Ab protein of MON 810 maize. Specific recommendations for improvement are provided, based on the knowledge and experience accumulated through the implementation of this unique EU-wide harmonized plan. © 2017 Society of Chemical Industry. © 2017 Society of Chemical Industry.

  20. Identifying the ‘if’ for ‘if-then’ plans: Combining implementation intentions with cue-monitoring targeting unhealthy snacking behaviour

    NARCIS (Netherlands)

    Verhoeven, A.A.C.; Adriaanse, M.A.; Vet, de E.; Fennis, B.M.; Ridder, de D.T.D.

    2014-01-01

    Implementation intentions aimed at changing unwanted habits require the identification of personally relevant cues triggering the habitual response in order to be effective. To facilitate successful implementation intention formation, in the present study, planning was combined with cue-monitoring,