WorldWideScience

Sample records for ii procurement package

  1. Integrated Procurement Management System, Version II

    Science.gov (United States)

    Collier, L. J.

    1985-01-01

    Integrated Procurement Management System, Version II (IPMS II) is online/ batch system for collecting developing, managing and disseminating procurementrelated data at NASA Johnson Space Center. Portions of IPMS II adaptable to other procurement situations.

  2. Performance-oriented packaging: A guide to identifying, procuring, and using. Procurement and use of packaging using HM-181 regulations

    International Nuclear Information System (INIS)

    1994-09-01

    This document addresses procurement of nonbulk packaging used for nonradioactive, hazardous materials that are transported by highway. The basic procedure is the same when making shipments by other modes. However, other sections of the regulations may affect the packaging requirements when shipping by other modes. The variation in requirements is extensive when air transportation is selected. A packaging engineer or transportation specialist should be contacted for guidance wen transport is by a mode other than highway

  3. Performance-Oriented packaging: A guide to identifying, procuring, and using

    International Nuclear Information System (INIS)

    O'Brien, J.H.

    1992-09-01

    This document guides users through the process of correctly identifying, obtaining, and using performance-oriented packaging. Almost all hazardous material shipments can be made in commercially available performance-oriented packaging. To cover the remaining shipments requiring specially designed packaging, a design guide is being developed. The design guide is scheduled to be issued 1 year after this procurement guide

  4. Remote sensing procurement package: A management report for state and local governments

    Science.gov (United States)

    1981-01-01

    An overview of the remote sensing procurement process is presented for chief executives, senior administrators, and other local and state officials responsible for purchasing remote sensing products, services, or equipment. Guidelines are provided for planning, organizing, staffing, and implementing such a procurement project. Other sections of the four-volume package are described and their benefits examined.

  5. Ethics of cadaveric organ procurement and allocation (II).

    OpenAIRE

    MICHAŁOWICZ, B.; K SZCZYGIEŁ, REV; SAFJAN, M; RZEPLIŃSKI, A; LAND, W; NORTON DE MATOS, A; B CHYROWICZ, SISTER; W BOŁOZ, REV; YUSSIM, A; WICHROWSKI, M.

    2003-01-01

    Transplant Proc. 2003 May;35(3):1219-20. Ethics of cadaveric organ procurement and allocation (II). Michałowicz B, Rev K Szczygieł, Safjan M, Rzepliński A, Land W, Norton de Matos A, Sister B Chyrowicz, Rev W Bołoz, Yussim A, Wichrowski M. PMID: 12947911 [PubMed - indexed for MEDLINE

  6. Dual Use Packaging, Phase II

    Data.gov (United States)

    National Aeronautics and Space Administration — NASA calculation that over a kg of packaging waste are generated per day for a 6 member crew. This represents over 1.5 metric tons of waste during a Mars mission....

  7. Preparation of CAD infrastructure for ITER procurement packages allocated to Korea

    International Nuclear Information System (INIS)

    Kim, G.H.; Hwang, H.S.; Choi, J.H.; Lee, H.G.; Thomas, E.; Redon, F.; Wilhelm, B.

    2013-01-01

    Highlights: ► It is necessary to use the same CAD platform between project partners for efficient design collaboration. ► Several unexpected problems were found during preparation of the CAD infrastructure. ► The problems have resulted in a waste of time and cost. ► The approach using the same configurations is effective to avoid IT-related problems. ► The design activities are steadily being performed on the prepared ITER CAD platform. -- Abstract: It is necessary to use the same CAD platform for standardization and efficient design collaboration between project partners. ITER has selected CATIA with ENOVIA as the primary CAD and integration tool. During the preparation of the CAD infrastructure, there were several difficulties with respect to information technology (IT). ITER design is classified as mechanical and plant. The procurement arrangement is divided into three types; functional specification, detailed design, and build to print. Therefore, it is important to prepare the suitable prerequisites according to the design type, and to comply with CAD methodologies to avoid trial and error. This paper presents how to overcome the difficulties and how to perform the CAD activities for ITER Korea procurement packages including important matters on a CAD infrastructure in a big project

  8. RF and microwave microelectronics packaging II

    CERN Document Server

    Sturdivant, Rick

    2017-01-01

    Reviews RF, microwave, and microelectronics assembly process, quality control, and failure analysis Bridges the gap between low cost commercial and hi-res RF/Microwave packaging technologies Engages in an in-depth discussion of challenges in packaging and assembly of advanced high-power amplifiers This book presents the latest developments in packaging for high-frequency electronics. It is a companion volume to “RF and Microwave Microelectronics Packaging” (2010) and covers the latest developments in thermal management, electrical/RF/thermal-mechanical designs and simulations, packaging and processing methods, and other RF and microwave packaging topics. Chapters provide detailed coverage of phased arrays, T/R modules, 3D transitions, high thermal conductivity materials, carbon nanotubes and graphene advanced materials, and chip size packaging for RF MEMS. It appeals to practicing engineers in the electronic packaging and high-frequency electronics domain, and to academic researchers interested in underst...

  9. Remote sensing procurement package: A technical guide for state and local governments

    Science.gov (United States)

    1981-01-01

    The guide provides the tools and techniques for procuring remote sensing products and services. It is written for administrators, procurement officials and line agency staff who are directly involved in identifying information needs; defining remote sensing project requirements; soliciting and evaluating contract responses and negotiating, awarding, and administering contracts.

  10. 41 CFR 101-26.602-2 - Procurement of packaged petroleum products.

    Science.gov (United States)

    2010-07-01

    ... petroleum products. 101-26.602-2 Section 101-26.602-2 Public Contracts and Property Management Federal... petroleum products. (a) Packaged petroleum products listed in Federal Supply Catalog for Civil Agencies.... Requisitions for packaged petroleum items not in this catalog and not otherwise included in Defense Fuel Supply...

  11. Navy Acquisition Executive's Management Oversight and Procurement Authority Category I and II Programs

    National Research Council Canada - National Science Library

    2007-01-01

    .... This report discusses the management oversight and procurement authority within the Navy. Two other reports discussed the management oversight and procurement authority within the Army and Air Force...

  12. 19 CFR 24.13 - Car, compartment, and package seals; kind, procurement.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Car, compartment, and package seals; kind... SECURITY; DEPARTMENT OF THE TREASURY CUSTOMS FINANCIAL AND ACCOUNTING PROCEDURE § 24.13 Car, compartment.... Customs] [Can. Transit] for use on railroad cars, and “United States-Canada Customs” for use on samples...

  13. Technology transfer package on seismic base isolation - Volume II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-14

    This Technology Transfer Package provides some detailed information for the U.S. Department of Energy (DOE) and its contractors about seismic base isolation. Intended users of this three-volume package are DOE Design and Safety Engineers as well as DOE Facility Managers who are responsible for reducing the effects of natural phenomena hazards (NPH), specifically earthquakes, on their facilities. The package was developed as part of DOE's efforts to study and implement techniques for protecting lives and property from the effects of natural phenomena and to support the International Decade for Natural Disaster Reduction. Volume II contains the proceedings for the Short Course on Seismic Base Isolation held in Berkeley, California, August 10-14, 1992.

  14. Quality assurance guidance for TRUPACT-II [Transuranic Package Transporter-II] payload control

    International Nuclear Information System (INIS)

    1989-10-01

    The Transuranic Package Transporter-II (TRUPACT-II) Safety Analysis Report for Packaging (SARP) approved by the Nuclear Regulatory Commission (NRC), discusses authorized methods for payload control in Appendix 1.3.7 and the Quality Assurance (QA) requirements in Section 9.3. Subsection 9.3.2.1 covers maintenance and use of the TRUPACT-II and the specific QA requirements are given in DOE/WIPP 89-012. Subsection 9.3.2.2 covers payload compliance, for which this document was written. 6 refs

  15. NWTS waste package program plan. Volume II. Program logic networks

    International Nuclear Information System (INIS)

    1981-10-01

    This document describes the work planned for developing the technology to design, test and produce packages used for the long-term isolation of nuclear waste in deep geologic repositories. Waste forms considered include spent fuel and high-level waste. The testing and selection effort for barrier materials for radionuclide containment is described. The NWTS waste package program is a design-driven effort; waste package conceptual designs are used as input for preliminary designs, which are upgraded to a final design as materials and testing data become available. Performance assessment models are developed and validated. Milestones and a detailed schedule are given for the waste package development effort. Program logic networks defining work flow, interfaces among the NWTS Projects, and interrelationships of specific activities are presented. Detailed work elements are provided for the Waste Package Program Plan subtasks - design and development, waste form, barrier materials, and performance evaluation - for salt and basalt, host rocks for which the state of waste package knowledge and the corresponding data base are advanced

  16. Package

    Directory of Open Access Journals (Sweden)

    Arsić Zoran

    2013-01-01

    Full Text Available It is duty of the seller to pack the goods in a manner which assures their safe arrival and enables their handling in transit and at the place of destination. The problem of packing is relevant in two main respects. First of all the buyer is in certain circumstances entitled to refuse acceptance of the goods if they are not properly packed. Second, the package is relevant to calculation of price and freight based on weight. In the case of export trade, the package should conform to the legislation in the country of destination. The impact of package on environment is regulated by environment protection regulation of Republic if Serbia.

  17. Safety analysis report for the TRUPACT-II shipping package (condensed version). Volume 1, Rev. 14

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    The condensed version of the TRUPACT-II Contact Handled Transuranic Waste Safety Analysis Report for Packaging (SARP) contains essential material required by TRUPACT-II users, plus additional contents (payload) information previously submitted to the U.S. Nuclear Regulatory Commission. All or part of the following sections, which are not required by users of the TRUPACT-II, are deleted from the condensed version: (i) structural analysis, (ii) thermal analysis, (iii) containment analysis, (iv) criticality analysis, (v) shielding analysis, and (vi) hypothetical accident test results.

  18. Safety analysis report for the TRUPACT-II shipping package (condensed version). Volume 1, Rev. 14

    International Nuclear Information System (INIS)

    1994-10-01

    The condensed version of the TRUPACT-II Contact Handled Transuranic Waste Safety Analysis Report for Packaging (SARP) contains essential material required by TRUPACT-II users, plus additional contents (payload) information previously submitted to the U.S. Nuclear Regulatory Commission. All or part of the following sections, which are not required by users of the TRUPACT-II, are deleted from the condensed version: (i) structural analysis, (ii) thermal analysis, (iii) containment analysis, (iv) criticality analysis, (v) shielding analysis, and (vi) hypothetical accident test results

  19. Safety evaluation for packaging transport of LSA-II liquids in MC-312 cargo tanks

    Energy Technology Data Exchange (ETDEWEB)

    Carlstrom, R.F.

    1996-09-11

    This safety evaluation for packaging authorizes the onsite transfer of bulk LSA-II radioactive liquids in the 222-S Laboratory Cargo Tank and Liquid Effluent Treatment Facility Cargo Tanks (which are U.S. Department of Transportation MC-312 specification cargo tanks) from their operating facilities to tank farm facilities.

  20. Safety evaluation for packaging (Onsite) transport of LSA-II liquids in MC-312 cargo tanks

    International Nuclear Information System (INIS)

    Carlstrom, R.F.

    1996-01-01

    This safety evaluation for packaging authorizes the onsite transfer of bulk LSA-II radioactive liquids in the 222-S Laboratory Cargo Tank and Liquid Effluent Treatment Facility Cargo Tanks (which are U.S. Department of Transportation MC-312 specification cargo tanks) from their operating facilities to tank farm facilities

  1. Melanie II--a third-generation software package for analysis of two-dimensional electrophoresis images: II. Algorithms.

    Science.gov (United States)

    Appel, R D; Vargas, J R; Palagi, P M; Walther, D; Hochstrasser, D F

    1997-12-01

    After two generations of software systems for the analysis of two-dimensional electrophoresis (2-DE) images, a third generation of such software packages has recently emerged that combines state-of-the-art graphical user interfaces with comprehensive spot data analysis capabilities. A key characteristic common to most of these software packages is that many of their tools are implementations of algorithms that resulted from research areas such as image processing, vision, artificial intelligence or machine learning. This article presents the main algorithms implemented in the Melanie II 2-D PAGE software package. The applications of these algorithms, embodied as the feature of the program, are explained in an accompanying article (R. D. Appel et al.; Electrophoresis 1997, 18, 2724-2734).

  2. Drug procurement and management.

    Science.gov (United States)

    Salhotra, V S

    2003-03-01

    A strong drug procurement and management system under the RNTCP is critical to programme success. Significant improvements in manufacturing, inspection, supply, storage and quality control practices and procedures have been achieved due to an intensive RNTCP network. Drugs used in RNTCP are rifampicin, isoniazid, ethambutol, pyrazinamide and streptomycin. Patients of TB are categorised into I, II and III and each category has a different standarised treatment. Procurement, distribution system and quality assurance of drugs are narrated in brief in this article.

  3. The application of NISA II FEM package in seismic qualification of small class IE electric motors

    International Nuclear Information System (INIS)

    Fancev, T.; Saban, I.; Grgic, D.

    1995-01-01

    According to the IEEE standards 323/1974 and 344/1975, seismic qualification of class IE equipment is appropriate combination of test and analysis methods. Complex equipment and assemblies are usually tested through seismic testing. The analysis is recommended for simple equipment that can be easily modeled to correctly predict its response. This article deals with the application of NISA II FEM package in 3D FE modeling and mode shape calculations of small power low voltage electric motors. (author)

  4. Deep Impact Delta II Launch Vehicle Cracked Thick Film Coating on Electronic Packages Technical Consultation Report

    Science.gov (United States)

    Cameron, Kenneth D.; Kichak, Robert A.; Piascik, Robert S.; Leidecker, Henning W.; Wilson, Timmy R.

    2009-01-01

    The Deep Impact spacecraft was launched on a Boeing Delta II rocket from Cape Canaveral Air Force Station (CCAFS) on January 12, 2005. Prior to the launch, the Director of the Office of Safety and Mission Assurance (OS&MA) requested the NASA Engineering and Safety Center (NESC) lead a team to render an independent opinion on the rationale for flight and the risk code assignments for the hazard of cracked Thick Film Assemblies (TFAs) in the E-packages of the Delta II launch vehicle for the Deep Impact Mission. The results of the evaluation are contained in this report.

  5. Procurement strategic analysis of nuclear safety equipment

    International Nuclear Information System (INIS)

    Wu Caixia; Yang Haifeng; Li Xiaoyang; Li Shixin

    2013-01-01

    The nuclear power development plan in China puts forward a challenge on procurement of nuclear safety equipment. Based on the characteristics of the procurement of nuclear safety equipment, requirements are raised for procurement process, including further clarification of equipment technical specification, establishment and improvement of the expert database of the nuclear power industry, adoption of more reasonable evaluation method and establishment of a unified platform for nuclear power plants to procure nuclear safety equipment. This paper makes recommendation of procurement strategy for nuclear power production enterprises from following aspects, making a plan of procurement progress, dividing procurement packages rationally, establishing supplier database through qualification review and implementing classified management, promoting localization process of key equipment continually and further improving the system and mechanism of procurement of nuclear safety equipment. (authors)

  6. Building Procurement

    DEFF Research Database (Denmark)

    Andersson, Niclas

    2007-01-01

    evolves from a simple establishment of a contractual relationship to a central and strategic part of construction. The authors relate to cultural, ethical and social and behavioural sciences as the fundamental basis for analysis and understanding of the complexity and dynamics of the procurement system......‘The procurement of construction work is complex, and a successful outcome frequently elusive’. With this opening phrase of the book, the authors take on the challenging job of explaining the complexity of building procurement. Even though building procurement systems are, and will remain, complex...... despite this excellent book, the knowledge, expertise, well-articulated argument and collection of recent research efforts that are provided by the three authors will help to make project success less elusive. The book constitutes a thorough and comprehensive investigation of building procurement, which...

  7. Evaluation of criticality criteria for fissile class II packages in transportation

    International Nuclear Information System (INIS)

    Thomas, J.T.

    1976-01-01

    The nuclear criticality safety of packages in transportation is explored systematically by a surface density representation of reflected array criticality of air-spaced units. Typical perturbations to arrays are shown to be related analytically to the corresponding reactivity changes they produce. The reactivity change associated with the removal of three reflecting surfaces from a totally water reflected array is shown to depend upon the fissile material loading of the packages. For U(93.2) metal, the expected reactivity loss can range from 2 to 21%. Replacement of a three-sided reflector of water on a critical array by one of concrete results in a reactivity increase ranging from 0 to 6%. Mass limits established by criticality data for reflected arrays of air-spaced units can provide a minimum, uniform margin of safety, expressible in terms of reactivity, to more reliably specify subcriticality in transport. Mass limits less than those defined by air-spaced units in water-reflected arrays are unnecessary for Fissile Class II packages. (author)

  8. A case study of packaging waste collection systems in Portugal - Part II: Environmental and economic analysis.

    Science.gov (United States)

    Pires, Ana; Sargedas, João; Miguel, Mécia; Pina, Joaquim; Martinho, Graça

    2017-03-01

    An understanding of the environmental impacts and costs related to waste collection is needed to ensure that existing waste collection schemes are the most appropriate with regard to both environment and cost. This paper is Part II of a three-part study of a mixed packaging waste collection system (curbside plus bring collection). Here, the mixed collection system is compared to an exclusive curbside system and an exclusive bring system. The scenarios were assessed using life cycle assessment and an assessment of costs to the waste management company. The analysis focuses on the collection itself so as to be relevant to waste managers and decision-makers who are involved only in this step of the packaging life cycle. The results show that the bring system has lower environmental impacts and lower economic costs, and is capable of reducing the environmental impacts of the mixed system. However, a sensitivity analysis shows that these results could differ if the curbside collection were to be optimized. From economic and environmental perspectives, the mixed system has few advantages. Copyright © 2016 Elsevier Ltd. All rights reserved.

  9. Safety analysis report for the TRUPACT-II shipping package (condensed version). Volume 2, Rev. 14

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-10-01

    This appendix determines the effective G values for payload shipping categories of contact handled transuranic (CH-TRU) waste materials, based on the radiolytic G values for waste materials that are discussed in detail in Appendix 3.6.8 of the Safety Analysis Report for the TRUPACT-II Shipping Package. The effective G values take into account self-absorption of alpha decay energy inside particulate contamination and the fraction of energy absorbed by nongas-generating materials. As described in Appendix 3.6.8, an effective G value, G{sub eff}, is defined by: G{sub eff} - {Sigma}{sub M} (F{sub M} x G{sub M}) F{sub M}-fraction of energy absorbed by material maximum G value for a material where the sum is over all materials present inside a waste container. The G value itself is determined primarily by the chemical properties of the material and its temperature. The value of F is determined primarily by the size of the particles containing the radionuclides, the distribution of radioactivity on the various materials present inside the waste container, and the stopping distance of alpha particles in air, in the waste materials, or in the waste packaging materials.

  10. Safety analysis report for the TRUPACT-II shipping package (condensed version). Volume 2, Rev. 14

    International Nuclear Information System (INIS)

    1994-10-01

    This appendix determines the effective G values for payload shipping categories of contact handled transuranic (CH-TRU) waste materials, based on the radiolytic G values for waste materials that are discussed in detail in Appendix 3.6.8 of the Safety Analysis Report for the TRUPACT-II Shipping Package. The effective G values take into account self-absorption of alpha decay energy inside particulate contamination and the fraction of energy absorbed by nongas-generating materials. As described in Appendix 3.6.8, an effective G value, G eff , is defined by: G eff - Σ M (F M x G M ) F M -fraction of energy absorbed by material maximum G value for a material where the sum is over all materials present inside a waste container. The G value itself is determined primarily by the chemical properties of the material and its temperature. The value of F is determined primarily by the size of the particles containing the radionuclides, the distribution of radioactivity on the various materials present inside the waste container, and the stopping distance of alpha particles in air, in the waste materials, or in the waste packaging materials

  11. Software package evaluation for the TJ-II Data Acquisition System

    International Nuclear Information System (INIS)

    Cremy, C.; Sanchez, E.; Portas, A.; Vega, J.

    1996-01-01

    The TJ-II Data Acquisition System (DAS) has to provide a user interface which will allow setup for sampling channels, discharge signal visualization and reduce data processing, all in run time. On the other hand, the DAS will provide a high level software capability for signal analysis, processing and data visualization either in run time or off line. A set of software packages including Builder Xcessory, X-designer, llog Builder, Toolmaster, AVS 5, AVS/Express, PV-WAVE and Iris Explorer, have been evaluated by the Data Acquisition Group of the Fusion Division. the software evaluation, resumed in this paper, has resulted in a global solution being found which meets all of the DAS requirements. (Author)

  12. Sustainable Procurement

    DEFF Research Database (Denmark)

    Telles, Pedro; Ølykke, Grith Skovgaard

    2017-01-01

    and within it how sustainable requirements have increased the level of compliance required, particularly regulatory compliance. Compliance was already present in previous EU public procurement frameworks, but its extent on Directive 2014/24/EU leads the authors to consider the current legal framework...

  13. TEST and EVALUATION REPORT FOR THE HEDGEHOG-II PACKAGING SYSTEMS DOT-7A TYPE A CONTAINER

    International Nuclear Information System (INIS)

    KELLY, D.L.

    2003-01-01

    This report documents the US. Department of Transportation Specification 7A (DOT-7A) Type A compliance test and evaluation results for the Hedgehog-II packaging systems. The approved Hedgehog-II packaging configurations provide primary and secondary containment. The approved packaging configurations described within this report are designed to ship Type A quantities of radioactive materials, normal form. Contents may be in solid or liquid form. Liquids transported in the approved 1 L glass bottle assembly shall have a specific gravity of less than or equal to 1.6. Liquids transported in all other approved configurations shall have a specific gravity of less than or equal to 2.0. The solid contents, including packaging, are limited in weight to the gross weight of the as-tested liquids and bottles. The approved Hedgehog-II packaging configurations described in this report may be transported by air, and have been evaluated as meeting the applicable International Air Transport Association/International Civil Aviation Organization (IATA/ICAO) Dangerous Goods Regulations in addition to the DOT requirements

  14. Regional trade agreements & procurement rules : facilitators or hindrances?

    OpenAIRE

    ANDERSON, Robert D.; MÜLLER, Anna Caroline; PELLETIER, Philippe

    2015-01-01

    This Working Paper considers the significance of government procurement chapters in regional trade agreements (RTAs), both in their own right and vis-à-vis the WTO Agreement on Government Procurement (GPA). The paper finds, inter alia, that: (i) a strong complementarity exists between government procurement trade commitments and general goods and services trade commitments, making integration of procurement commitments in a more general system such as the WTO Agreements desirable; (ii) govern...

  15. ACEMAN (II): a PDP-11 software package for acoustic emission analysis

    International Nuclear Information System (INIS)

    Tobias, A.

    1976-01-01

    A powerful, but easy-to-use, software package (ACEMAN) for acoustic emission analysis has been developed at Berkeley Nuclear Laboratories. The system is based on a PDP-11 minicomputer with 24 K of memory, an RK05 DISK Drive and a Tektronix 4010 Graphics terminal. The operation of the system is described in detail in terms of the functions performed in response to the various command mnemonics. The ACEMAN software package offers many useful facilities not found on other acoustic emission monitoring systems. Its main features, many of which are unique, are summarised. The ACEMAN system automatically handles arrays of up to 12 sensors in real-time operation during which data are acquired, analysed, stored on the computer disk for future analysis and displayed on the terminal if required. (author)

  16. Procurement Tracking System (PTS)

    Data.gov (United States)

    Office of Personnel Management — The Procurement Tracking System (PTS) is used solely by the procurement staff of the Office of the Inspector General (OIG) at the U.S. Office of Personnel Management...

  17. Discriminatory public procurement policies

    NARCIS (Netherlands)

    Ssennoga, Francis

    2010-01-01

    To achieve social economic objectives, governments usually institute discriminatory practices in their country’s public procurement framework. Discriminatory procurement is the practice by governments to favour their own domestic suppliers over foreign firms for advertised contracts. Favouring

  18. Public procurement process

    African Journals Online (AJOL)

    NESG Policy Brief: April 2017. Public ... transparency in public procurement; and greater concerns about efficiency, fairness, and equity. ... government enacted the Public Procurement Act (2007) [1] which provides legislative framework for.

  19. Procurement Career Management Handbook.

    Science.gov (United States)

    Department of the Treasury, Washington, DC.

    This handbook is the result of the Treasury Department's efforts to increase professionalism among its procurement employees nationwide through its Procurement Career Management Program. First, the scope and objectives of the Procurement Career Management Program are discussed. The remaining sections of the handbook deal with the following program…

  20. Comparative assessment of gastrointestinal irritant potency in man of tin(II) chloride and tin migrated from packaging.

    Science.gov (United States)

    Boogaard, Peter J; Boisset, Michel; Blunden, Steve; Davies, Scot; Ong, Teng Jin; Taverne, Jean-Pierre

    2003-12-01

    Tin is present in low concentrations in most canned foods and beverages, the highest levels being found in products packaged in unlacquered or partially lacquered tinplate cans. A limited number of case-reports of acute gastrointestinal disorders after consumption of food containing 100-500 mg/kg tin have been reported, but these reports suffer many insufficiencies. Controlled clinical studies on acute effects of tin migrated from packaging suggest a threshold concentration for adverse effects (AEs) of >730 mg/kg. Two separate randomised, single-centre, double-blind, crossover studies, enabling comparison of the tolerability of tin added as tin(II) chloride at concentrations of soup in 24 volunteers (Study 2) were carried out. Distribution studies were conducted to get insight in the acute AEs of low molecular weight (clear dose-response relationship was only observed when tin was added as tin(II) chloride in tomato juice. No clinically significant AEs were reported in Study 2 and comparison of the incidence of tin-related AEs showed no difference between the dose levels (including control). Tin species of low molecular weight in supernatant represented 31-32% of total tin in canned tomato soup versus 56-61% in juice freshly spiked with tin(II) chloride. Differences in the incidence of AEs following administration of tomato juice with 161 and 264 mg of tin per kg and tomato soup with 201 and 267 mg of tin per kg likely results from differences in the concentration of low molecular weight tin species and in the nature of tin complexes formed. The results of this work demonstrate that tin levels up to 267 mg/kg in canned food cause no AEs in healthy adults and support the currently proposed tin levels of 200 mg/kg and 250 mg/kg for canned beverages and canned foods, respectively, as safe levels for adults in the general population.

  1. Eugenol-loaded chitosan nanoparticles: II. Application in bio-based plastics for active packaging.

    Science.gov (United States)

    Woranuch, Sarekha; Yoksan, Rangrong

    2013-07-25

    The aim of the present research was to study the possibility of using eugenol-loaded chitosan nanoparticles as antioxidants for active bio-based packaging material. Eugenol-loaded chitosan nanoparticles were incorporated into thermoplastic flour (TPF) - a model bio-based plastic - through an extrusion process at temperatures above 150°C. The influences of eugenol-loaded chitosan nanoparticles on crystallinity, morphology, thermal properties, radical scavenging activity, reducing power, tensile properties and barrier properties of TPF were investigated. Although the incorporation of 3% (w/w) of eugenol-loaded chitosan nanoparticles significantly reduced the extensibility and the oxygen barrier property of TPF, it provided antioxidant activity and improved the water vapor barrier property. In addition, TPF containing eugenol-loaded chitosan nanoparticles exhibited superior radical scavenging activity and stronger reducing power compared with TPF containing naked eugenol. The results suggest the applicability of TPF containing eugenol-loaded chitosan nanoparticles as an antioxidant active packaging material. Copyright © 2012 Elsevier Ltd. All rights reserved.

  2. The footprint of the JSF/F-35 Lightning II military jet in the Netherlands: geopolitical and geo-economic considerations in arms procurement and arms production

    NARCIS (Netherlands)

    Mamadouh, V.; van der Wusten, H.

    2011-01-01

    While the European Union aims at developing a common foreign policy and a common arms market, European states still collaborate poorly in the field of actual defence procurement. National firms (each furtively supported by its national government) often compete with each other as much as with

  3. SEISPLN: Reference manual for the SEISPLN earthquake analysis package on the DEC MicroVAX II

    Energy Technology Data Exchange (ETDEWEB)

    Rieken, E.

    1989-01-01

    The SEISPLN package generates statistically significant fault surfaces for subsets of an earthquake database. The parameters used are up to the discretion of the user, but the package is based primarily on the geometric relationships of the foci locations and the location errors of the foci. The technique employed to locate subsets of foci which are considered to be subplanar concentrations of foci is as follows: First, a three dimensional grid system is created with elongated cells which will ultimately count the number of foci per cell for every possible strike and dip orientation of the grid system. A table is output which gives the number of foci per cell for every strike orientation. There is a corresponding table for each frequency table which calculates the relative change in frequency between neighboring cells. These tables bring out the relative concentrations of foci regardless of how many foci are in the cell. This is a significant benefit compared to the Fehler, Lutz, and Michelinni and Bolt techniques, which tend to wash out low frequency foci concentrations. Second, the user can run the next program to pull out subsets of the foci which are considered to be good picks'' from the frequency tables. Third, the next program will take the subset of foci and find the best fit surface using a multiple linear regression technique. The calculated surface can be planar (first order), arcuate (second order), or of very complex surface geometry (third order). Finally, the last program plots all the foci, along with the foci pick, surface fit, and fault trace, in a stereographic projection which can be rotated and multipulated in an almost infinite variety of ways. 11 figs.

  4. Hanford Immobilized LAW Product Acceptance: Tanks Focus Area Testing Data Package II

    International Nuclear Information System (INIS)

    Schulz, Rebecca L.; Lorier, Troy H.; Peeler, David K.; Brown, Kevin G.; Reamer, Irene A.; Vienna, John D.; Jiricka, Antonin; Jorgensen, Benaiah M.; Smith, Donald E.

    2001-01-01

    This report is a continuation of the Hanford Immobilized Low Activity Waste (LAW) Product Acceptance (HLP): Initial Tanks Focus Area Testing Data Package (Vienna (and others) 2000). In addition to new 5000-h product consistency test (PCT), vapor hydration test (VHT), and alteration products data, some previously reported data together with relevant background information are included for an easily accessible source of reference when comparing the response of the various glasses to different test conditions. A matrix of 55 glasses was developed and tested to identify the impact of glass composition on long-term corrosion behavior and to develop an acceptable composition region for Hanford LAW glasses. Of the 55 glasses, 45 were designed to systematically vary the glass composition, and 10 were selected because large and growing databases on their corrosion characteristics had accumulated. The targeted and measured compositions of these glasses are found in the Appendix A. All glasses were fabricated according to standard procedures and heat treated to simulate the slow cooling that will occur in a portion of the waste glass after vitrification in the planned treatment facility at Hanford

  5. Indonesia - Procurement Modernization

    Data.gov (United States)

    Millennium Challenge Corporation — The evaluation seeks to establish evidence on the possible effects of an intervention designed to modernize public procurement: effects on cost savings, performance...

  6. Public Procurement and Innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    be understood as a special case of innovation, where social processes – and consequently the institutions governing these social processes – need to be considered. This book contributes to our understanding with a detailed institutional analysis of the public procurement of innovation.......Max Rolfstam examines the increasing emphasis on public procurement as a means to stimulate innovation and the theoretical implications of this policy development. While ‘regular’ public procurement may be regarded as the outcome of anonymous market processes, public procurement of innovation must...

  7. Y-12 defense programs. Nuclear Packaging Systems testing capabilities

    International Nuclear Information System (INIS)

    1995-06-01

    The Nuclear Packaging Systems (NPS) Department can manage/accomplish any packaging task. The NPS organization is responsible for managing the design, testing, certification, procurement, operation, refurbishment, maintenance, and disposal of packaging used to transport radioactive materials, other hazardous materials, and general cargoes on public roads and within the Oak Ridge Y-12 Plant. Additionally, the NPS Department has developed a Quality Assurance plan for all packaging, design and procurement of nonweapon shipping containers for radioactive materials, and design and procurement of performance-oriented packaging for hazardous materials. Further, the NPS Department is responsible for preparation and submittal of Safety Analysis Reports for Packaging (SARP). The NPS Department coordinates shipping container procurement and safety certification activities that have lead-times of up to two years. A Packaging Testing Capabilities Table at the Oak Ridge complex is included as a table

  8. Organ procurement: Spanish transplant procurement management.

    Science.gov (United States)

    Manyalich, Martí; Mestres, Carlos A; Ballesté, Chloë; Páez, Gloria; Valero, Ricard; Gómez, María Paula

    2011-06-01

    Transplantation is an accepted therapeutic option to save or improve the quality of life when organ failure occurs or tissue replacements are needed. However, the lack of organs is the major limitation. The deceased organ procurement organization and professionals provide the solution to this international problem. In this review, we identify the elements involved in the organ procurement management process to analyze the possibility of implementation of deceased organ procurement for a transplantation program. While the donation rates are subject to several negative factors including religious, economic, cultural, and legal issues, the existence of well-trained professionals may considerably increase them. Professional training in organ donation along with the establishment of a solid organizational system has been identified as the crucial factor in developing efficient organ donation and transplantation programs.

  9. Procurement with Specialized Firms

    NARCIS (Netherlands)

    Boone, J.; Schottmuller, C.

    2011-01-01

    This paper analyzes optimal procurement mechanisms in a setting where the procurement agency has incomplete information concerning the firms’ cost functions and cares about quality as well as price. Low type firms are cheaper than high type firms in providing low quality but more expensive when

  10. Procurement with specialized firms

    NARCIS (Netherlands)

    Boone, Jan; Schottmuller, C.

    2016-01-01

    We analyze optimal procurement mechanisms when firms are specialized. The procurement agency has incomplete information concerning the firms' cost functions and values high quality as well as low price. Lower type firms are cheaper (more expensive) than higher type firms when providing low (high)

  11. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laiho, Aki; Laine, Jari

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, Procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... is presented and results of a first case study discussed. The findings highlight the importance of taking a contingency perspective on Procurement organization, understanding the internal and internal contingency factors. From a theoretical perspective, it opens up insights that can be furthermore leveraged...... in future studies in the fields of hybrid procurement organizations, global sourcing organizations as well as international procurement offices (IPOs). From a practical standpoint, an assessment of external and internal contingencies provides the opportunity to consciously match organization to its...

  12. Conflicts in Public Procurement

    Directory of Open Access Journals (Sweden)

    Helena Lindskog

    2013-01-01

    Full Text Available During the last couple of years, there has been a tendency to include more and more political goals into public procurements, such as environmental and societal considerations. This can result in higher prices paid by the public sector compared with similar procurements in the private sector. The decision makers at local level are elected and should represent the interest of their communities and voters, which includes promoting regional/local companies and economic development. This task can sometimes get into conflict with public procurement law or the political goals of a central government. (original abstract

  13. Brexit and government procurement

    OpenAIRE

    Dawar, Kamala

    2017-01-01

    This briefing paper looks at some of the legal issues that will affect the UK’s public procurement laws and policies following Brexit. For, once the UK revokes the European Communities Act 1972, it will no longer be obligated to follow the EU Procurement Directives, nor will it be subject to the commitments the EU has signed up to on behalf of the UK in the WTO Government Procurement Agreement (GPA) and in Preferential Trade Agreements (PTAs). Additionally, under the Devolution Settlement of ...

  14. Inefficient procurement processes undermine access to medicines in ...

    African Journals Online (AJOL)

    Inefficient procurement processes undermine access to medicines in the Western ... chronic infectious and non-communicable diseases in the public sector. ... (ii) absence of contracts for certain medicines appearing on provincial code lists; ...

  15. Ukraine : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the country procurement assessment are to diagnose the public procurement system in Ukraine, assess compatibility of the country's laws, policies and procedures with international best practices, review compliance with the procurement laws and regulations and identify areas for improvement of the procurement system in Ukraine. With due recognition of the considerable...

  16. Croatia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2005-01-01

    Based on the CPAR's analysis of the legislative framework, procurement practices, institutional capacity and the opportunity for corruption, the assessment found that the environment for conducting public procurement in Croatia is average. This report makes a series of recommendations designed to strengthen the public procurement environment of Croatia, including legislative reform, improving procurement procedures and practices, institutional reform, capacity building, and the development of...

  17. Fighting corruption in tactical procurement

    NARCIS (Netherlands)

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In

  18. Evolving Procurement Organizations

    DEFF Research Database (Denmark)

    Bals, Lydia; Laine, Jari; Mugurusi, Godfrey

    Procurement has to find further levers and advance its contribution to corporate goals continuously. This places pressure on its organization in order to facilitate its performance. Therefore, procurement organizations constantly have to evolve in order to match these demands. A conceptual model...... and external contingency factors and having a more detailed look at the structural dimensions chosen, beyond the well-known characteristics of centralization, formalization, participation, specialization, standardization and size. From a theoretical perspective, it opens up insights that can be leveraged...

  19. Sustainable Bridge Infrastructure Procurement

    DEFF Research Database (Denmark)

    Safi, Mohammed; Du, Guangli; Simonsson, Peter

    2016-01-01

    The lack of a flexible but systematic approach for integrating lifecycle aspects into bridge investment decisions is a major obstacle hindering the procurement of sustainable bridge infrastructures. This paper addresses this obstacle by introducing a holistic approach that agencies could use...... to procure the most “sustainable” (lifecycle-efficient) bridge through a fair design-build (D-B) tendering process, considering all the main aspects: life-cycle cost (LCC), service life-span, aesthetic demands and environmental impacts (LCA)....

  20. Small Business Procurement Event

    Science.gov (United States)

    2014-08-13

    Small Business Procurement Event 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT NUMBER 5e. TASK...NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Department of the Navy,Office of Small Business Programs,720 Kennon...distribution unlimited 13. SUPPLEMENTARY NOTES NDIA 27th Navy Gold Coast Small Business Procurement Event, 12-13 Aug 2014, San Diego, CA. 14. ABSTRACT

  1. Fighting corruption in tactical procurement

    OpenAIRE

    Obanda Wanyama, Peter

    2010-01-01

    Vast amount of public resources are spent on procurement. Effective public procurement yields additional budget space, hence it ought to be conducted with due diligence. However, public procurement most especially tactical procurement in local governments in Uganda is vulnerable to corruption. In this thesis we analyze how tactical procurement can be managed to fight corruption and promote integrity in the decentralized context in local governments in Uganda. Specifically, we identify the mos...

  2. Opto-mechanical assembly procurement for the National Ignition Facility

    International Nuclear Information System (INIS)

    House, W.; Simon, T.

    1999-01-01

    A large number of the small optics procurements for the National Ignition Facility (NIF) at Lawrence Livermore National Laboratory (LLNL) will be in the form of completely assembled, tested, and cleaned subsystems. These subsystems will be integrated into the NIF at LLNL. To accomplish this task, the procurement packages will include, optical and mechanical drawings, acceptance test and cleanliness requirements. In January 1999, the first such integrated opto-mechanical assembly was received and evaluated at LLNL. With the successful completion of this important trial procurement, we were able to establish the viability of purchasing clean, ready to install, opto-mechanical assemblies from vendors within the optics industry. 32 vendors were chosen from our supplier database for quote, then five were chosen to purchase from. These five vendors represented a cross section of the optics industry. From a ''value'' catalog supplier (that did the whole job internally) to a partnership between three specialty companies, these vendors demonstrated they have the ingenuity and capability to deliver cost competitive, NIF-ready, opto- mechanical assemblies. This paper describes the vendor selection for this procurement, technical requirements including packaging, fabrication, coating, and cleanliness specifications, then testing and verification. It also gives real test results gathered from inspections performed at LLNL that show how our vendors scored on the various requirements. Keywords: Opto-Mechanical, assembly, NIF, packaging, shipping, specifications, procurement, MIL-STD-1246C, surface cleanliness

  3. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, Kjell [Karinta-Konsult, Taeby (Sweden); Chataignier, Stephane [Electricite de France (France); Drottz-Sjoeberg, Britt-Marie [BMD Research (Sweden)] [and others

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  4. Public Values and Stakeholder Involvement - A new framework for Performance Assessment? The European Project RISCOM-II. Work Package 1

    International Nuclear Information System (INIS)

    Andersson, Kjell; Chataignier, Stephane; Drottz-Sjoeberg, Britt-Marie

    2002-11-01

    RISCOM-II is a project within the fifth framework programme of the European Commission. It is based on a widely recognised need for more transparent decision processes in nuclear waste management. The objective of the RISCOM-II project is to share the knowledge of the context of radioactive waste management in various European countries and to see to what extent it is possible to apply more widely the RISCOM Model in order to improve the acceptability of radioactive waste management. Thus, the project aims to promote the development of processes involving transparency, as well as means involving greater participation of the public. Key topics studied in the RISCOM-II Project are issues in risk assessment to better understand how factual elements relate to value-laden issues and how stakeholder concerns can be addressed, as well as organizational issues affecting transparency in Europe. A range of public participation processes are analysed, some will be selected for testing and hearings are evaluated with respect to transparency. There are five participating countries: Sweden, the United Kingdom, Finland, the Czech Republic, and France, which are represented by various organizations: safety or radiation protection authorities, operators involved in nuclear wastes and the production of nuclear power, research institutes or organizations, and consultants. Work Package No 1(WP-1), Public values and performance assessment, emphasises the importance of value-laden issues involved in nuclear waste management. The expert dominance in the field has so far tended to avoid values or deal with them in seemingly factual frameworks. The objectives of (WP-1) are thus: 1. to identify value-laden issues raised by performance assessment, trying to understand how factual and technical elements relate to value-laden issues 2. to find value judgements of stakeholders, and explore if and how they could be addressed in performance assessment 3. to initiate open debate about risk and

  5. Data feature: Fuel procurement

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    This document is a review of the effect of fuel costs on the procurement strategies of a utility and a conjecture that the same strategies may have an effect on the price of fuel. Factors affecting fuel costs are reviewed, and a number of procurement strategies taken to trim fuel costs are reviewed. The major trend is away from long-term enrichment contracts and into such strategies as: (1) Spot market purchases, (2) Inventory reduction, (3) Purchase of CIS material, and (4) Market-related contracts instead of base-escalated contracts

  6. Indonesia - Country Procurement Assessment Report : Reforming the Public Procurement System

    OpenAIRE

    World Bank

    2001-01-01

    The main objectives of the Country Procurement Assessment Review (CPAR) are to diagnose the public procurement system in Indonesia, assess actual compliance with the country's procurement laws and regulations on the ground, and identify reforms to improve the existing system in line with internationally accepted principles. Section 1 gives an overview. Section 2 describes Indonesia's exist...

  7. CORRELATES OF PROCUREMENT PERFORMANCE OF ...

    African Journals Online (AJOL)

    Osondu

    2013-02-22

    Feb 22, 2013 ... Purpose of this study is to investigate if procurement challenges, contractual procedures, designer's experience ... Design and Build, Project Management, Direct. Labour and ..... Government Procurement Performance in.

  8. Slovakia : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2001-01-01

    This update of the 1995 CPAR is based on the September 1999 PPA and the findings of the Bank CPAR mission to Slovakia in November 1999. The 1999 Public Procurement Act (PPA) is an improvement upon the previous PPAs in some respects, including the creation of an OPP, more detailed and clear procurement procedures, accreditation of procurement professionals, introduction of the Public Procu...

  9. Tanzania : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  10. OAS :: Accountability :: Procurement

    Science.gov (United States)

    OAS, including its organizational structure, each organizational unit's staffing, vacant posts, and a list of procurement notices for formal bids, links to the performance contract and travel control Performance Contract reports from January 2013 to June 2017 may be found.) Travel Information and Control

  11. Procurement Sustainable Building Practice

    NARCIS (Netherlands)

    Schmid, P.

    1998-01-01

    Two aspects will be stressed in the frame of this topic: The Procurement Aspects and the Aspects of Conflict and Dispute Resolution. The Right for Environment - to introduce the following aspects - is not only the consequence of care-taking for Nature as an admirable phenomenon, but also as a source

  12. Certification of ERDA contractors' packaging with respect to compliance with DOT specification 7A performance requirements

    International Nuclear Information System (INIS)

    Edling, D.A.; Griffin, J.F.

    1975-01-01

    The purpose of this study was to have one ERDA contractor: (1) compile a list of specification packagings, proposed by ERDA contractors, for shipping Type A quantities of radioactive material, and (2) analyze these packages for conformance to Specification 7A requirements. This study was divided into two phases. Phase I provides a report on those packages which could be shown, based on existing test data and engineering analyses, to conform to DOT Specification 7A packaging requirements. The results of Phase I are discussed in detail in the publication, ''Certification of AEC Contractor's Packagings With Respect to Compliance with DOT Specification 7A Performance Requirements -- Phase I Summary Report,'' D. A. Edling, H. E. Meyer and G. L. Phillabaum (Schedule 189C, May 26, 1974). The objectives of Phase II were: (1) identification of packages from Phase I for which available information was not adequate for certification. (Those specification containers used by ERDA contractors and those containers for which adequate information was available for certification are listed in the Phase I summary report.); (2) identification of specific test/engineering analysis data required; (3) generation/procurement of these data; and (4) documentation of study results for use by all ERDA contractors and private industry. The results of Phase II of the study are presented. (U.S.)

  13. Public Procurement of Innovation Policy

    DEFF Research Database (Denmark)

    Rolfstam, Max; Petersen, Ole Helby

    2014-01-01

    Until recently, Danish policy interest in public procurement has mainly been driven by efficiency and cost-effectiveness concerns. Public-procurement policies have in general focused on the utilisation of economies of scale as a Means of achieving lower prices on goods and services. Attempts...... to develop mandatory procurement systems have also been gradually developing, while the focus on innovation has been relatively modest in Danish procurement policies until recently. This picture is currently changing, as several initiatives emphasising public procurement as a means of stimulating innovation...... have been launched. Whether this gradual change of focus in Danish procurement policies will make a deep and lasting impact on the role of public procurement as a driver for innovationis, however, yet an open question....

  14. PROCUREMENT AND CONTRACT MANAGEMENT

    CERN Multimedia

    Training & Development Group; Linda Orr-Easo; Tel. 72460; Nathalie Dumeaux; Tel. 78144

    2001-01-01

    We are pleased to announce the launch of a new training on: Procurement and Contract Management (This seminar will be run by CERN experts in French or in English) Level 1 The aim is to raise awareness of the key issues involved. Date : 8 June 2001 This level is open to everyone. Participants should register via our Web page as soon as possible. Level 2 To develop the skills needed to effectively manage contracts, from the Technical, Commercial and Legal aspects. Dates : Three days, Autumn 2001 This Level is open to those who are/will be more directly responsible for procurement and contract management. Participants should have followed Level 1. For a description of the seminar, please consult:   Level 1: http://training.web.cern.ch/Training/MANCO/P9798/9-cm_e.htm Level 2: http://training.web.cern.ch/Training/MANCO/P9798/9-cm2_e.htm

  15. Price competition in procurement

    International Nuclear Information System (INIS)

    Keisler, J.M.; Buehring, W.A.

    1996-07-01

    When creating a private market to provide a public good, government agencies can influence the market's competitive characteristics. Markets have predictable, but often counterintuitive, behaviors. To succeed in applying available controls, and thereby reduce future costs, agencies must understand the behavior of the market. A model has been constructed to examine some issues in establishing competition for a structure in which there are economies of scale and government is obligated to purchase a fixed total quantity of a good. This model is used to demonstrate a way to estimate the cost savings from several alternative plans for a buyer exploring competitive procurement. The results are not and cannot be accurate for budgeting purposes; rather, they indicate the approximate magnitude of changes in cost that would be associated with changes in the market structure within which procurement occurs

  16. Defense Primer: Procurement

    Science.gov (United States)

    2017-02-10

    Usually, incremental funding is used to mitigate peaks and valleys in annual budgets caused by the cost of one item significantly changing the...base defense budget . DOD uses these funds to buy several different types of materiel, including  new items easily recognizable as military...pursues a policy of full funding for procurement, meaning that the total estimated cost of each unit must be funded in the year it is budgeted . In a

  17. Designing flexible procurement systems

    OpenAIRE

    Hughes, Will

    1990-01-01

    The systems used for the procurement of buildings are organizational systems. They involve people in a series of strategic decisions, and a pattern of roles, responsibilities and relationships that combine to form the organizational structure of the project. To ensure effectiveness of the building team, this organizational structure needs to be contingent upon the environment within which the construction project takes place. In addition, a changing environment means that the organizational s...

  18. DOE program guide for universities and other research groups. Part I. DOE Research and Development Programs; Part II. DOE Procurement and Assistance Policies/Procedures

    Energy Technology Data Exchange (ETDEWEB)

    1980-03-01

    This guide addresses the DOE responsibility for fostering advanced research and development of all energy resources, both current and potential. It is intended to provide, in a single publication, all the fundamental information needed by an institution to develop a potential working relationship with DOE. Part I describes DOE research and development programs and facilities, and identifies areas of additional research needs and potential areas for new research opportunities. It also summarizes budget data and identifies the DOE program information contacts for each program. Part II provides researchers and research administrators with an introduction to the DOE administrative policies and procedures for submission and evaluation of proposals and the administration of resulting grants, cooperative agreements, and research contracts. (RWR)

  19. Procurement and participation opportunities

    International Nuclear Information System (INIS)

    Lovatt, D.

    1998-01-01

    The elements which drive the Sable Offshore Energy Project and its procurement processes were described. The project is privately financed, hence business practices must adhere to strict principles to be able to compete with alternative energy sources and to ensure success for all stakeholders including owners, contractors, suppliers and the business community. One of the objectives of the project is to adhere to the requirements of applicable legislation and not to compromise health, safety and environmental standards. To ensure this compliance by all concerned, the regulatory requirements are embedded in the contracting and procurement procedures. Details of the procurement cycle are described. A list of some of the successes that Nova Scotian companies have had in getting work on the project was provided as an illustration of the ingenuity and foresight of these companies to develop appropriate quality assurance and health, safety and environmental procedures, and to bring in the needed capacity and technology through the formation of joint ventures and alliances. The list of contracts represents more than 100 million dollars worth of work to date. 3 figs

  20. Multicriteria analysis in public procurement

    Directory of Open Access Journals (Sweden)

    Dejan T. Tošev

    2012-07-01

    Full Text Available The public procurement is one of the most important processes in modern company daily business. The quality of that process and its realization affect the overall company success and reputation. For that purpose, the management is obliged to prepare and carry out the procurement process carefully. The process is based on multicriteria tendering and the purpose of this paper is to present the analytical and hierarchical procurement methods in order to minimize failing in the selection and decision making process.

  1. Packaging fluency

    DEFF Research Database (Denmark)

    Mocanu, Ana; Chrysochou, Polymeros; Bogomolova, Svetlana

    2011-01-01

    Research on packaging stresses the need for packaging design to read easily, presuming fast and accurate processing of product-related information. In this paper we define this property of packaging as “packaging fluency”. Based on the existing marketing and cognitive psychology literature on pac...

  2. How is service procurement different from goods procurement? Exploring ex ante costs and ex post problems in IT procurement

    NARCIS (Netherlands)

    Wynstra, Finn; Rooks, Gerrit; Snijders, Chris

    2018-01-01

    Several studies suggest that, in practice, service procurement is more challenging than goods procurement. The underlying but largely implicit argument is that the procurement process for services involves higher buyer uncertainty and therefore requires extra efforts to mitigate this uncertainty.

  3. Melanie II--a third-generation software package for analysis of two-dimensional electrophoresis images: I. Features and user interface.

    Science.gov (United States)

    Appel, R D; Palagi, P M; Walther, D; Vargas, J R; Sanchez, J C; Ravier, F; Pasquali, C; Hochstrasser, D F

    1997-12-01

    Although two-dimensional electrophoresis (2-DE) computer analysis software packages have existed ever since 2-DE technology was developed, it is only now that the hardware and software technology allows large-scale studies to be performed on low-cost personal computers or workstations, and that setting up a 2-DE computer analysis system in a small laboratory is no longer considered a luxury. After a first attempt in the seventies and early eighties to develop 2-DE analysis software systems on hardware that had poor or even no graphical capabilities, followed in the late eighties by a wave of innovative software developments that were possible thanks to new graphical interface standards such as XWindows, a third generation of 2-DE analysis software packages has now come to maturity. It can be run on a variety of low-cost, general-purpose personal computers, thus making the purchase of a 2-DE analysis system easily attainable for even the smallest laboratory that is involved in proteome research. Melanie II 2-D PAGE, developed at the University Hospital of Geneva, is such a third-generation software system for 2-DE analysis. Based on unique image processing algorithms, this user-friendly object-oriented software package runs on multiple platforms, including Unix, MS-Windows 95 and NT, and Power Macintosh. It provides efficient spot detection and quantitation, state-of-the-art image comparison, statistical data analysis facilities, and is Internet-ready. Linked to proteome databases such as those available on the World Wide Web, it represents a valuable tool for the "Virtual Lab" of the post-genome area.

  4. Corruption in emergency procurement.

    Science.gov (United States)

    Schultz, Jessica; Søreide, Tina

    2008-12-01

    Corruption in emergency procurement reduces the resources available for life-saving operations, lowers the quality of products and services provided, and diverts aid from those who need it most.(1) It also negatively influences public support for humanitarian relief, both in the affected country and abroad. This paper aims to unpack and analyse the following question in order to mitigate risk: how and where does corruption typically occur, and what can be done? Suggested strategies reflect a multi-layered approach that stresses internal agency control mechanisms, conflict-sensitive management, and the need for common systems among operators.

  5. Procurement Sustainability Tensions

    DEFF Research Database (Denmark)

    Fayezi, Sajad; Zomorrodi, Maryam; Bals, Lydia

    2018-01-01

    as stakeholder and institutional theory. Design/methodology/approach: The authors use a multiple case study approach. Data are collected through multiple interviews and archival data from eight case companies in Australia. Findings: The authors identify supply chain and company procurement sustainability...... of institutional distance, can characterize the manifestation of PSTs. Practical implications: The findings are instrumental for managers to make informed decisions when dealing with PSTs, and they pave the way for paradoxical leadership given the increasing importance of simultaneous development and balancing...

  6. The European contribution to the procurement of the ITER Remote Handling systems

    International Nuclear Information System (INIS)

    Damiani, Carlo; Irving, Mike; Semeraro, Luigi

    2009-01-01

    Fusion for Energy (F4E) will manage the European in-kind contribution of various remote handling (RH) systems for the maintenance of ITER components: (i) the divertor cassette movers, end effectors, manipulator arms and tooling; (ii) 50% of the transfer casks, in particular the air transfer systems and some in-cask devices; (iii) the in-vessel viewing and metrology system (IVVS); (iv) the Neutral Beam (NB) Cell crane, manipulator arms, tooling, Caesium Oven replacement tooling, NB source installation/removal trolley, auxiliary vehicles. A wide range of technologies is involved: special monorail crane, movers, manipulator arms, pipe cutting/welding tooling, special cameras, laser-based metrology devices, control systems, virtual reality. An important aspect to consider is the resistance to radiation levels that range from max ∼10 KGy/h for IVVS down to ∼1 Gy/h for the RH devices operating in the NB cell. Given the unprecedented complexity of the ITER maintenance scenario, a development strategy is being implemented that includes prototyping and testing of RH subsystems before proceeding with the final production for ITER. This paper presents an overview of the various procurement packages, the status of development for each of them, the validation and procurement strategy, including issues like radiation resistance and standardisation policy, and the organisational and managerial challenges in relation with the complex ITER Organisation (IO).

  7. Microelectronic packaging

    CERN Document Server

    Datta, M; Schultze, J Walter

    2004-01-01

    Microelectronic Packaging analyzes the massive impact of electrochemical technologies on various levels of microelectronic packaging. Traditionally, interconnections within a chip were considered outside the realm of packaging technologies, but this book emphasizes the importance of chip wiring as a key aspect of microelectronic packaging, and focuses on electrochemical processing as an enabler of advanced chip metallization.Divided into five parts, the book begins by outlining the basics of electrochemical processing, defining the microelectronic packaging hierarchy, and emphasizing the impac

  8. Development and field evaluation of animal feed supplementation packages (AFRA project II-17 - RAF/5/041). Project summary

    International Nuclear Information System (INIS)

    Makkar, H.P.S.

    2002-01-01

    The Joint FAO/IAEA programme has supported animal production research in Africa for many years through country Technical Co-operation (TC) Projects, Regional Projects (AFRA) and Co-ordinated Research Project (CRP). These activities have helped to build up the infrastructure needed in the countries concerned to conduct much of the research in animal reproduction and nutrition. In the past the Agency has provided technical assistance in defining reproductive indices of ruminant livestock species and identifying nutritional constraints to productivity of animals maintained on smallholder farms under various topographical and environmental conditions. In view of the satisfactory progress of AFRA Project VIII in identifying the major constraints to livestock productivity in the region, and the recognition of many Member States of the importance of supplementary feeding for improving milk and meat production, a regional strategy was proposed for developing affordable and sustainable supplementation packages for improving productivity from smallholder farms using locally available feed resources. The new Regional Project was initiated in 1997 with the following objectives: 1. To produce a supplementary feed in the form of a convenient and easy-to-use package for improving milk and meat production in peri-urban areas 2. To promote the uptake of this technology through demonstrations of its advantages in terms of increased productivity and benefit: cost ratio 3. To maximize the use of locally available feed material such as molasses, cereal bran, legume tree leaves, oil seed meals, etc. for feeding ruminant livestock, thereby reducing the use of high cost concentrate feeds 4. To promote technical co-operation amongst developing countries (TCDC) in the region and take advantage of established infrastructure and available human and technical resources to solve problems of common interest. From 1997 until 2000 the project has been operational with 13 Member States

  9. Industry activities to resolve utility procurement issues

    International Nuclear Information System (INIS)

    Rosch, F.

    1993-01-01

    There are several industry organizations which are active in assisting the utilities in their equipment procurement enhancement. They include the Nuclear Management Resources Council (NUMARC), the Electric Power Research Institute (EPRI), and the Nuclear Procurement Issues Committee (NUPIC). The products include the NUMARC Procurement Initiatives, EPRI procurement related guidelines and databases, and NUPIC joint audits and commercial grade surveys. The industry procurement activities and products are reviewed, and their use by utilities to enhance their procurement process is related. 1 fig

  10. Bulk material engineering and procurement management of NPS

    International Nuclear Information System (INIS)

    Fu Sanhong; Fan Kai

    2005-01-01

    In a nuclear power project, bulk material is often not in an outstanding position, compared to equipment, yet bulk material is one of most difficult part in engineering and procurement management. If the schedule is not in good control, it will seriously hamper the progress of the whole project. The article explores bulk material engineering and procurement management of NPS, illustrated with tables and graphs. First, major difficult aspects of bulk material procurement are described. On one hand, bulk material is really bulky in kind. We must have detail information of manufacturers, manufacture duration, and take good control of bidding schedule. On the other hand, when an order is placed, we need to make clear everything in the procurement package, such as material types, delivery batches, quantity of each batch and delivery schedule, which is a tremendous work. Then, a schedule conflict is analyzed: when an order is placed, the detail type and quantity cannot be defined (since the construction design is not finished yet). To settle this conflict, the concept 'Requirement Schedule Curve' is brought forward, along with the calculation method. To get this curve, we need to make use of the technical data of the reference power station, along with the site construction schedule, to produce a site quantity requirement curve varying from time, for each type of material. Last, based on the 'Requirement Schedule Curve', we are able to build a unified database to control the engineering, procurement, manufacturing and delivery schedule, so as to procure precisely, manufacture on time, and optimize the storage. In this way, the accurate control of bulk material engineering and procurement schedule can be achieved. (authors)

  11. Optimizing Eco-Efficiency Across the Procurement Portfolio.

    Science.gov (United States)

    Pelton, Rylie E O; Li, Mo; Smith, Timothy M; Lyon, Thomas P

    2016-06-07

    Manufacturing organizations' environmental impacts are often attributable to processes in the firm's upstream supply chain. Environmentally preferable procurement (EPP) and the establishment of environmental purchasing criteria can potentially reduce these indirect impacts. Life-cycle assessment (LCA) can help identify the purchasing criteria that are most effective in reducing environmental impacts. However, the high costs of LCA and the problems associated with the comparability of results have limited efforts to integrate procurement performance with quantitative organizational environmental performance targets. Moreover, environmental purchasing criteria, when implemented, are often established on a product-by-product basis without consideration of other products in the procurement portfolio. We develop an approach that utilizes streamlined LCA methods, together with linear programming, to determine optimal portfolios of product impact-reduction opportunities under budget constraints. The approach is illustrated through a simulated breakfast cereal manufacturing firm procuring grain, containerboard boxes, plastic packaging, electricity, and industrial cleaning solutions. Results suggest that extending EPP decisions and resources to the portfolio level, recently made feasible through the methods illustrated herein, can provide substantially greater CO2e and water-depletion reductions per dollar spend than a product-by-product approach, creating opportunities for procurement organizations to participate in firm-wide environmental impact reduction targets.

  12. Uzbekistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2003-01-01

    Uzbekistan inherited the Soviet system for the procurement of goods, works and services for State needs. This system was suitable for a command economy but lacks the essential elements of competitiveness, transparency and accountability, which are the hallmarks of a market-based approach to government contracting. This Country Procurement Assessment Report (CPAR) comes at a time when a num...

  13. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2003-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the WIPP management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document provides the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs

  14. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT Shipping Package, and directly related components. This document complies with the minimum requirements as specified in TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event there is a conflict between this document and the SARP or C of C, the SARP and/or C of C shall govern. C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SAR P charges the WIPP Management and Operation (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 CFR 71.11. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. This document details the instructions to be followed to operate, maintain, and test the TRUPACT-II and HalfPACT packaging. The intent of these instructions is to standardize these operations. All users will follow these instructions or equivalent instructions that assure operations are safe and meet the requirements of the SARPs

  15. Sustainability requirements in EU public and private procurement – a right or an obligation

    DEFF Research Database (Denmark)

    Andrecka, Marta; Peterkova, Katerina

    2017-01-01

    procurement. This is true both for the public and private sectors. However, there is only limited legal regulation of sustainable procurement, which causes many uncertainties in respect to the possibility to include sustainability concerns into procurement processes as well as consequences of (not) doing so...... and private procurement and similarities and differences between the sectors are identified. We find that in both sectors sustainability topics (i) are increasingly considered and implemented into contracts; (ii) deal with similar issues in both contexts; (iii) cover issues that are linked to the subject....... Still, it is found that while there is a right to include sustainability considerations into both public and private procurement processes, there are only contours of the legal obligation to do so. In respect to private procurement, the right to give considerations to sustainability issues...

  16. MEMS packaging

    CERN Document Server

    Hsu , Tai-Ran

    2004-01-01

    MEMS Packaging discusses the prevalent practices and enabling techniques in assembly, packaging and testing of microelectromechanical systems (MEMS). The entire spectrum of assembly, packaging and testing of MEMS and microsystems, from essential enabling technologies to applications in key industries of life sciences, telecommunications and aerospace engineering is covered. Other topics included are bonding and sealing of microcomponents, process flow of MEMS and microsystems packaging, automated microassembly, and testing and design for testing.The Institution of Engineering and Technology is

  17. Interactivity of marketing and procurement

    Directory of Open Access Journals (Sweden)

    Lazarević Dragan

    2007-01-01

    Full Text Available General conclusions regarding the close links between marketing and procurement side of the marketing process would be expressed as follows: Interactive link between marketing and procurement is just proportionate to a level of company's market orientation. Establishment of an interactive link between marketing and procurement fields would reflect on pricing. Besides price competition, establishment of an integral approach through comprehensive understanding of market relations, will set up conditions for company to meet customers' needs in the most optimal way. Therefore the total result will be advanced and a company with this kind of orientation can become a market leader.

  18. 40 CFR 35.6565 - Procurement methods.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Procurement methods. 35.6565 Section 35... Actions Procurement Requirements Under A Cooperative Agreement § 35.6565 Procurement methods. The... purchase procedures are those relatively simple and informal procurement methods for securing services...

  19. PROMIS (Procurement Management Information System)

    Science.gov (United States)

    1987-01-01

    The PROcurement Management Information System (PROMIS) provides both detailed and summary level information on all procurement actions performed within NASA's procurement offices at Marshall Space Flight Center (MSFC). It provides not only on-line access, but also schedules procurement actions, monitors their progress, and updates Forecast Award Dates. Except for a few computational routines coded in FORTRAN, the majority of the systems is coded in a high level language called NATURAL. A relational Data Base Management System called ADABAS is utilized. Certain fields, called descriptors, are set up on each file to allow the selection of records based on a specified value or range of values. The use of like descriptors on different files serves as the link between the falls, thus producing a relational data base. Twenty related files are currently being maintained on PROMIS.

  20. Procurement Policy for Armored Vehicles

    National Research Council Canada - National Science Library

    Jolliffe, Richard B; Burton, Bruce A; Carros, Deborah L; Schaefer, Beth K; Truong, Linh; Palmer, Kevin A; Chun, Judy M; Smith, Jessica M; Abraham, Amanda M; Peters, Anthony R

    2007-01-01

    Congresswoman Louise M. Slaughter requested that the Inspector General (IG), DoD review the DoD procurement history for body armor and armored vehicles and determine whether officials properly followed contracting policies...

  1. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2008-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the pplication.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  2. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2009-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  3. Procurement engineering - the productivity factor

    Energy Technology Data Exchange (ETDEWEB)

    Bargerstock, S.B. (TENERA, L.P., Chattanooga, TN (United States))

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station.

  4. The organization of organ procurement.

    Science.gov (United States)

    Prottas, J M

    1989-01-01

    The American organ procurement system has improved and matured in the last five years. At the same time, the basic challenges facing it have remained substantially the same because the moral and legal framework of the system has not changed. Success at organ procurement continues to depend on the voluntary cooperation of medical professionals and the families of potential organ donors. The generosity of the American public is so great that the primary challenge facing organ procurement agencies is obtaining cooperation from hospitals and medical professionals. This calls for a "marketing" orientation aimed at those hospitals and professionals who are most likely to treat potential donors. The last five years have seen a more general acceptance of this appreciation of the central task of organ procurement. As a result, the overall effectiveness of the system has improved, as measured by the number of organs procured on a per capita basis and by the number of multiorgan donors obtained. Much of this improvement can be attributed to the diffusion of organizational techniques and approaches, and this diffusion has been encouraged by the involvement of national organizations and public bodies in the organ procurement community. The system remains uneven in its effectiveness and further improvement is possible. It is also possible that the next general round of improvement will result from the application of businesslike information management and marketing techniques.

  5. Procurement engineering - the productivity factor

    International Nuclear Information System (INIS)

    Bargerstock, S.B.

    1993-01-01

    The industry is several years on the road to implementation of the Nuclear Management and Resources Council (NUMARC) initiatives on commercial-grade item dedication and procurement. Utilities have taken several approaches to involve engineering in the procurement process. A common result for the approaches is the additional operations and maintenance (O ampersand M) cost imposed by the added resource requirements. Procurement engineering productivity is a key element in controlling this business area. Experience shows that 400 to 500% improvements in productivity are possible with a 2-yr period. Improving the productivity of the procurement engineering function is important in today's competitive utility environment. Procurement engineering typically involves four distinct technical evaluation responsibilities along with several administrative areas. Technical evaluations include the functionally based safety classification of replacement components and parts (lacking a master parts list), the determination of dedication requirements for safety-related commercial-grade items, the preparation of a procurement specification to maintain the licensed design bases, and the equivalency evaluation of alternate items not requiring the design-change process. Administrative duties include obtaining technical review of vendor-supplied documentation, identifying obsolete parts and components, resolving material nonconformances, initiating the design-change process for replacement items (as needed), and providing technical support to O ampersand M. Although most utilities may not perform or require all the noted activities, a large percentage will apply to each utility station

  6. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2005-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: ''each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.'' They further state: ''each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.'' Chapter 9.0 of the SARP charges the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.

  7. Sustainable Procurement in Practice: Explaining the Degree of Sustainable Procurement from an Organisational Perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien); S.M. Groeneveld (Sandra); B.S. Kuipers (Ben); A.J. Steijn (Bram)

    2013-01-01

    textabstractSustainable procurement is often used to reduce negative environmental impacts related to production and consumption. Several studies in the sustainable procurement literature have identified potential drivers of and barriers to sustainable procurement, which are often organisational in

  8. Packaging microservices

    DEFF Research Database (Denmark)

    Montesi, Fabrizio; Thrane, Dan Sebastian

    2017-01-01

    We describe a first proposal for a new packaging system for microservices based on the Jolie programming language, called the Jolie Package Manager (JPM). Its main features revolve around service interfaces, which make the functionalities that a service provides and depends on explicit. For the f......We describe a first proposal for a new packaging system for microservices based on the Jolie programming language, called the Jolie Package Manager (JPM). Its main features revolve around service interfaces, which make the functionalities that a service provides and depends on explicit...

  9. Study protocol: evaluation of specialized outpatient palliative care (SOPC) in the German state of Hesse (ELSAH study) - work package II: palliative care for pediatric patients.

    Science.gov (United States)

    Ulrich, Lisa-R; Gruber, Dania; Hach, Michaela; Boesner, Stefan; Haasenritter, Joerg; Kuss, Katrin; Seipp, Hannah; Gerlach, Ferdinand M; Erler, Antje

    2018-01-05

    In 2007, the European Association of Palliative Care (EAPC) provided a comprehensive set of recommendations and standards for the provision of adequate pediatric palliative care. A number of studies have shown deficits in pediatric palliative care compared to EAPC standards. In Germany, pediatric palliative care patients can be referred to specialized outpatient palliative care (SOPC) services, which are known to enhance quality of life, e.g. by avoiding hospitalization. However, current regulations for the provision of SOPC in Germany do not account for the different circumstances and needs of children and their families compared to adult palliative care patients. The "Evaluation of specialized outpatient palliative care (SOPC) in the German state of Hesse (ELSAH)" study aims to perform a needs assessment for pediatric patients (children, adolescents and young adults) receiving SOPC. This paper presents the study protocol for this assessment (work package II). The study uses a sequential mixed-methods study design with a focus on qualitative research. Data collection from professional and family caregivers and, as far as possible, pediatric patients, will involve both a written questionnaire based on European recommendations for pediatric palliative care, and semi-structured interviews. Additionally, professional caregivers will take part in focus group discussions and participatory observations. Interviews and focus groups will be tape- or video-recorded, transcribed verbatim and analyzed in accordance with the principles of grounded theory (interviews) and content analysis (focus groups). A structured field note template will be used to record notes taken during the participatory observations. Statistical Package for Social Sciences (SPSS, version 22 or higher) will be used for descriptive statistical analyses. The qualitative data analyses will be software-assisted by MAXQDA (version 12 or higher). This study will provide important information on what matters

  10. PROCUREMENT INSOURCING VS. PROCUREMENT OUTSOURCING: EVIDENCE FROM SERBIA

    Directory of Open Access Journals (Sweden)

    Slobodan Acimovic

    2016-11-01

    Full Text Available One of the most important strategic decisions of a company is to choose whether to insource or outsource a particular group of activities or a business function. The trend of outsourcing those activities which do not form a part of the company core competences is becoming more and more present in business practice. The aim of the analysis within this paper is to review the mentioned trend from the position of organizing the company procurement activities. The analysis shows that there is no unique trend concerning outsourcing all logistics activities, which do not form a part of the company core competences. Unlike the majority of other logistics activities, which as non-basic, tend to be outsourced, procurement dominantly stays insourced. Finally, based on the empirical evidence obtained from a survey carried out among 52 companies in Serbia, it is concluded that even if procurement is outsourced, this trend is more present among service than production companies.

  11. THE BARRIERS OF IMPLEMENTING E-PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Corina Pop Sitar

    2011-01-01

    Full Text Available The concept of e-procurement has many different meanings ranging from shopping on theinternet (through reverse auction to collaborative initiatives taking place in virtualmeetings. There are many forms of e-procurement that can be found in the literature. In thispaper we define the most important forms of e-procurement. Next, we present the mainbarriers of implementing an e-procurement found in the literature. Furthermore, we presenta matrix with the main barriers of e-procurement classified in four main categories. Finally,we elaborated for managers some guidelines in order to overcome the barriers ofimplementing e-procurement.

  12. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant| (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations(CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  13. CH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2007-01-01

    The purpose of this document is to provide the technical requirements for preparation for use, operation, inspection, and maintenance of a Transuranic Package Transporter Model II (TRUPACT-II), a HalfPACT shipping package, and directly related components. This document complies with the minimum requirements as specified in the TRUPACT-II Safety Analysis Report for Packaging (SARP), HalfPACT SARP, and U.S. Nuclear Regulatory Commission (NRC) Certificates of Compliance (C of C) 9218 and 9279, respectively. In the event of a conflict between this document and the SARP or C of C, the C of C shall govern. The C of Cs state: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' They further state: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP charges the U.S. Department of Energy (DOE) or the Waste Isolation Pilot Plant (WIPP) management and operating (M and O) contractor with assuring packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8. Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21 regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these regulations

  14. NASA Procurement Career Development Program

    Science.gov (United States)

    1987-01-01

    The NASA Procurement Career Development Program establishes an agency-wide framework for the management of career development activity in the procurement field. Within this framework, installations are encouraged to modify the various components to meet installation-specific mission and organization requirements. This program provides a systematic process for the assessment of and planning for the development, training, and education required to increase the employees' competence in the procurement work functions. It includes the agency-wide basic knowledge and skills by career field and level upon which individual and organizational development plans are developed. Also, it provides a system that is compatible with other human resource management and development systems, processes, and activities. The compatibility and linkage are important in fostering the dual responsibility of the individual and the organization in the career development process.

  15. URGENSI STUDI TENTANG PROCUREMENT CONTRACT

    Directory of Open Access Journals (Sweden)

    Yohanes Sogar Simamora

    2006-01-01

    Full Text Available Contractualization is kind of goverment activity in acquiring goods, services and infrastructure as well. Procurement contract has several important function especially in enhancing economic development in a state. In Indonesia, this kind of contract also has function in empowering micro economic scale. Since the aim of procurement study is to provide equal protection between public fund interest in one hand and privat sector in the other hand, general principle of contract law must be taken into consideration together with transparency as the most important principle in government contract.

  16. Public Procurement of Innovation in Sweden

    DEFF Research Database (Denmark)

    Rolfstam, Max; Ågren, Robert

    2014-01-01

    Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect ...... government authorities to engage in public procurement for innovation, and by issuing guidance on the topic.......Sweden is often thought of as a country with a strong tradition for using public procurement as a means to stimulate innovation. Early on, Sweden recognized and developed procedures for using public procurement as a technologydevelopment tool. After a period where emphasis was put on this aspect...... of public procurement Sweden dropped many policy initiatives within this field. This was in part due to neo-liberal movements during the 1980s which in interaction with a distributed institutional setup led to the removal of incentives for a procuring authority to engage in public procurement of innovation...

  17. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    Development (OECD) sees public procurement ―as a strategic policy lever to advance ... financial markets and provision of advisory services to businesses and government. ... Procurement established by the Section 3 of the Act. The BPP is the ... present annual reports to the Minister on the public procurement processes;.

  18. 78 FR 37525 - Procurement List; Deletions

    Science.gov (United States)

    2013-06-21

    .... Contracting Activity: Dept of the Air Force, FA7014 AFDW A7KI, Andrews AFB, MD. Service Type/Location: Laundry... Procurement List. SUMMARY: This action deletes products and services from the Procurement List that were... products and services listed below are no longer suitable for procurement by the Federal Government under...

  19. 22 CFR 226.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement records. 226.46 Section 226.46 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.46 Procurement records...

  20. 10 CFR 436.43 - Procurement planning.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 3 2010-01-01 2010-01-01 false Procurement planning. 436.43 Section 436.43 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION FEDERAL ENERGY MANAGEMENT AND PLANNING PROGRAMS Agency Procurement of Energy Efficient Products § 436.43 Procurement planning. (a) Agencies should consider the...

  1. 10 CFR 21.31 - Procurement documents.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Procurement documents. 21.31 Section 21.31 Energy NUCLEAR REGULATORY COMMISSION REPORTING OF DEFECTS AND NONCOMPLIANCE Procurement Documents § 21.31 Procurement documents. Each individual, corporation, partnership, dedicating entity, or other entity subject to the...

  2. 7 CFR 225.17 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ...) Procurements by public sponsors comply with applicable State or local laws and the standards set forth in 7 CFR part 3016; and (2) Procurements by private nonprofit sponsors comply with standards set forth in 7 CFR... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement standards. 225.17 Section 225.17...

  3. 10 CFR 603.1300 - Procurement contract.

    Science.gov (United States)

    2010-01-01

    ... Used in this Part § 603.1300 Procurement contract. A Federal Government procurement contract. It is a... 10 Energy 4 2010-01-01 2010-01-01 false Procurement contract. 603.1300 Section 603.1300 Energy... Government and a State, a local government, or other non-government entity when the principal purpose of the...

  4. 32 CFR 37.1330 - Procurement contract.

    Science.gov (United States)

    2010-07-01

    ... REGULATIONS TECHNOLOGY INVESTMENT AGREEMENTS Definitions of Terms Used in This Part § 37.1330 Procurement contract. A Federal Government procurement contract. It is a legal instrument which, consistent with 31 U.S... 32 National Defense 1 2010-07-01 2010-07-01 false Procurement contract. 37.1330 Section 37.1330...

  5. Tanzania : Country Procurement Assessment Report, Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    This Country Procurement Assessment Report (CPAR)intends to determine the compatibility of national procurement law, and practices, with the principles of economy, and with international procurement practices. This CPAR, the second of its kind in Tanzania, looks at the legislative framework, the performance of regulatory functions, the enforcement regime, and the capacity of public sector ...

  6. 76 FR 43988 - Procurement List; Additions

    Science.gov (United States)

    2011-07-22

    ... this work, based on applicable experience. Finally, the purpose of the JWOD Act and the responsibility... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  7. 7 CFR 1780.72 - Procurement methods.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Procurement methods. 1780.72 Section 1780.72..., Constructing and Inspections § 1780.72 Procurement methods. Procurement shall be made by one of the following methods: Small purchase procedures; competitive sealed bids (formal advertising); competitive negotiation...

  8. 76 FR 26279 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-05-06

    ...-service area; clean and sanitize food service equipment, utensil cleaning, and dishwashing; clean pots... additions to the Procurement List. SUMMARY: The Committee is proposing to add services to the Procurement... in this notice will be required to procure the services listed below from nonprofit agencies...

  9. Competitive Procurement and Asset Specificity

    NARCIS (Netherlands)

    Sorana, V.

    2003-01-01

    This paper studies the effects of asset specificity on the performance of procurement auctions with subcontracting and asset sales.The analysis highlights the role of several asset features like transfer costs, type of alternative uses and maintenance requirements.It is argued that, if bargaining

  10. Organ procurement: let's presume consent

    OpenAIRE

    Moustarah, F

    1998-01-01

    IN WINNING FIRST PRIZE in the Logie Medical Ethics Essay Contest in 1997, Dr. Fady Moustarah made a strong and compelling argument in favour of presumed consent in the procurement of donor organs. He stressed that a major education campaign will be needed when such a policy is adopted lest some people begin to regard physicians as "organ vultures."

  11. Pakistan : Country Procurement Assessment Report

    OpenAIRE

    World Bank

    2000-01-01

    This report analyzes Pakistan's procurement system, and presents an extensive set of recommendations for strengthening same. It reviews the legal, and regulatory framework, as well as the mandatory registration and/or pre-qualification of suppliers, and contractors, and negotiation practices, and, analyzes bidding document issues for recommendation. Human resources development, auditing pr...

  12. Energy Performance Indicators in the Swedish Building Procurement Process

    Directory of Open Access Journals (Sweden)

    Ingrid Allard

    2017-10-01

    Full Text Available In Sweden, all new buildings need to comply with the National Board of Housing, Building and Planning’s requirement on specific purchased energy (kWh/m2. Accordingly, this indicator is often used to set design criteria in the building procurement process. However, when energy use is measured in finished buildings, the measurements often deviate significantly from the design calculations. The measured specific purchased energy does not necessarily reflect the responsibility of the building contractor, as it is influenced by the building operation, user behavior and climate. Therefore, Swedish building practitioners may prefer other indicators for setting design criteria in the building procurement process. The aim of this study was twofold: (i to understand the Swedish building practitioners’ perspectives and opinions on seven building energy performance indicators (envelope air leakage, U-values for different building parts, average U-value, specific heat loss, heat loss coefficient, specific net energy, and specific purchased energy; and (ii to understand the consequences for the energy performance of multi-family buildings of using the studied indicators to set criteria in the procurement process. The study involved a Delphi approach and simulations of a multi-family case study building. The studied indicators were discussed in terms of how they may meet the needs of the building practitioners when used to set building energy performance criteria in the procurement process.

  13. RASPLAV package

    International Nuclear Information System (INIS)

    1990-01-01

    The RASPLAV package for investigation of post-accident mass transport and heat transfer processes is presented. The package performs three dimensional thermal conduction calculations in space nonuniform and temperature dependent conductivities and variable heat sources, taking into account phase transformations. The processes of free-moving bulk material, mixing of melting fuel due to advection and dissolution, and also evaporation/adsorption are modelled. Two-dimensional hydrodynamics with self-consistent heat transfer are also performed. The paper briefly traces the ways the solution procedures are carried out in the program package and outlines the major results of the simulation of reactor vessel melting after a core meltdown. The theoretical analysis and the calculations in this case were carried out in order to define the possibility of localization of the zone reminders. The interactions between the reminders and the concrete are simulated and evaluation of the interaction parameters is carried out. 4 refs. (R.Ts)

  14. Selection of procurement systems in the South African construction industry: An exploratory study

    Directory of Open Access Journals (Sweden)

    W. D. Thwala

    2012-12-01

    Full Text Available Purpose of this paper: Procurement systems are vital in ensuring the successful implementation of construction projects precisely in all the phases of any particular project. Therefore, this paper aims to investigate in a systematic manner the factors that influence the selection of a procurement system in the South African construction industry. Research methodology: An extensive theory and literature review of procurement systems was conducted. The literature reviewed included a sample of case studies of procurement systems successfully implemented in completed building and civil engineering projects in South Africa. A questionnaire using a four-round Delphi survey method was used to conduct the empirical study in order to obtain participants' opinions about factors influencing the selection of procurement systems as well as the utility value of various procurement systems on each factor as identified. Finally, data analysis of both qualitative and quantitative techniques was performed using the Statistical Package for Social Sciences (SPSS. Findings: After qualitative analysis, findings of the literature reviewed suggest that factors that influence the selection of procurement systems cut across all the phases of the project as identified in this paper. Therefore, these factors are categorically classified into internal and external factors. Factors from the internal environment were further classified into client characteristics and project characteristics, with client characteristics comprising of variables such as clients' level of knowledge and control, political and social consideration, familiarity of procurement systems, competition, funding arrangement, government public/private sector projects and risk allocation whereas project characteristics comprise of factors (variables such as size and technical complexity of the project, influence of the project life cycle, expedited project delivery, time, quality and price certainty. Factors

  15. Getting the balance right between functional and non-functional requirements: the case of requirement specification in IT procurement

    Directory of Open Access Journals (Sweden)

    Björn Johansson

    2013-01-01

    Full Text Available IT procurement represents a business process of high importance, including the ability to articulate requirements that the procurement deals with. Furthermore, specifying requirements is of importance for both procurer and potential supplier, as it functions as central contractual element between the two. The purpose of this article is two-fold: (i to show how established terminology for requirement specification is represented in current call for bids for the procurement of IT; and (ii to introduce an organizing framework that may assist procurers in actively addressing functional requirements and business requirements. Ten “call for bids” were examined from a Swedish national procurement database. From the analysis of the bids, it can be concluded that: (i the call for bids displays a high degree of precision regarding hardware aspects, but less precision regarding software; (ii supplier experience and competence is stressed, but rarely elaborated on in detail; and (iii call for bids vagueness may be used as a lock-in opportunity for suppliers. From the discussion on this, a tentative procurement framework is suggested, aiming on increasing the logical transparency for the procurement of IT.

  16. Procurement Options for New Renewable Electricity Supply

    Energy Technology Data Exchange (ETDEWEB)

    Kreycik, C. E.; Couture, T. D.; Cory, K. S.

    2011-12-01

    State renewable portfolio standard (RPS) policies require utilities and load-serving entities (LSEs) to procure renewable energy generation. Utility procurement options may be a function of state policy and regulatory preferences, and in some cases, may be dictated by legislative authority. Utilities and LSEs commonly use competitive solicitations or bilateral contracting to procure renewable energy supply to meet RPS mandates. However, policymakers and regulators in several states are beginning to explore the use of alternatives, namely feed-in tariffs (FITs) and auctions to procure renewable energy supply. This report evaluates four procurement strategies (competitive solicitations, bilateral contracting, FITs, and auctions) against four main criteria: (1) pricing; (2) complexity and efficiency of the procurement process; (3) impacts on developers access to markets; and (4) ability to complement utility decision-making processes. These criteria were chosen because they take into account the perspective of each group of stakeholders: ratepayers, regulators, utilities, investors, and developers.

  17. Ethics and regulation in organ procurement research.

    Science.gov (United States)

    Ackerman, Terrence F; Winsett, Rebecca P

    2002-12-01

    This article explores the role of ethics and regulation in human research conducted by organ procurement agencies; basic ethical principles for human research are outlined. Organ procurement agencies are not required to observe federal regulations; however, voluntary adherence will ensure that procurement research is conducted according to current standards of ethical practice. Although most organ procurement research will qualify for exempt status, this determination should be made by an institutional review board. Even if studies qualify for exempt status, there is a moral presumption that informed consent should be sought, unless certain narrow conditions for waiver of consent are satisfied. Finally, when future research utilizing organ procurement records is anticipated, procurement coordinators should provide sufficiently detailed information to families about such plans to permit their advance informed consent to research activities.

  18. Evolution in public procurement and the impact of e-procurement platforms: A case study

    OpenAIRE

    Leal, Pedro Manuel Mariano

    2010-01-01

    A Work Project, presented as part of the requirements for the Award of a Masters Degree in Management from the NOVA – School of Business and Economics The aim of this project is to understand the evolution that occurred in the public procurement due to the new Public Contracts Code that changed the procurement procedures and forced public entities to use electronic procurement platforms. This work is a contribution to the understanding of the main procurement changes with this ...

  19. Services procurement under the WTO’s agreement on government procurement: whither market access?

    OpenAIRE

    Shingal, Anirudh

    2010-01-01

    This paper studies the government procurement of services from foreign suppliers by conducting a statistical analysis of data submitted by Japan and Switzerland to the WTO's Committee on Government Procurement. Using several metrics, the paper examines if the WTO’s Agreement on Government Procurement (GPA) has led to greater market access for foreign suppliers in services procurement. Our results indicate that despite the GPA, the proportions of services contracts awarded to foreigners have d...

  20. Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    OpenAIRE

    Mahamadu, A.-M. ed; Manu, P.; Booth, C.; Olomolaiye, P.; Coker, A.; Ibrahim, A. ed; Lamond, J.

    2018-01-01

    Purpose - Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. It is, however, unclear from the extant literature, what are the critical skills development needs of public personnel invol...

  1. Information Technology Procurement Authorization (ITPA) Tracking System

    Data.gov (United States)

    Office of Personnel Management — Information Technology Procurement Authorization (ITPA) Tracking System is used for gathering consistent data from U.S. Office of Personnel Management (OPM) program...

  2. Contracting Out Government Procurement Functions: An Analysis

    National Research Council Canada - National Science Library

    Lamm, David; Yoder, Cory

    2008-01-01

    ...)), asked the Naval Postgraduate School (NPS) to analyze the contracting out of procurement functions currently being accomplished by Navy, Marine Corps, and other Department of Defense (DOD) Activities...

  3. The International Experience in Public Procurement

    Directory of Open Access Journals (Sweden)

    Pysmenna Mariia S.

    2017-11-01

    Full Text Available The article is aimed at generalizing the foreign experience of implementing public procurement, analyzing peculiarities of organizational, normative and procedural provision of public procurement in the Member States of the European Union. The relevance of the research topic is due to the need to harmonize the procurement policy of the Government of Ukraine with the international legal framework and with broad political objectives within the European integration strategy. The organizational framework and principles of implementing public procurement in the EU Member States were analyzed. Special attention was paid to normative provision of public procurement by the EU Member States; peculiarities of the use of national or harmonized rules of public procurement in accordance with the amount of the procurement contract; restrictions and conditions for public authorities in the selection of applicants for bidding. Five types of public procurement procedures used in the EU have been characterized, namely: open procedure, limited procedure, negotiation procedure, competitive dialog, electronic auctions. The need to address the social and legal aspects of public procurement in international practice has been substantiated and the possibilities for resolving these problems have been presented.

  4. Risk Management in Public Procurement Process

    Directory of Open Access Journals (Sweden)

    Ioana Manea

    2010-12-01

    Full Text Available Public procurement represents an important part of the current economy reality. Throughout the procurement process, due to the effect of the interaction among the components of the public procurement system, certain actions with significant negative effects on its optimal operation may occur. Risks may turn into certainty either because of a simple error in the development and administration of the procurement process, or because of a deliberate deviation from the existing legal provisions. Therefore, there is an imperative for the implementation of certain risk-avoiding measures, as well as of measures aiming to reduce their negative effects in case of their occurrence.

  5. PUBLIC PROCUREMENT SYSTEM IN RUSSIA

    Directory of Open Access Journals (Sweden)

    Alla V. Trofimovskaya

    2013-01-01

    Full Text Available This article contains information on the theoretical-methodological research of the Institute of public procurement. The focus is on the consideration of the implementation of the priority tasks for the state contract system and the role in their solving that regional level of management can play. Opportunities in the sphere of state regulation, that Moscow, as the subject of the Federation, has, are educed in the article. The problem of transformation the existing contractual mechanisms for the formation of the model of public contract system, is studied.

  6. International overview of hospital procurement.

    Science.gov (United States)

    Ferrier, Maud; Lariviere, David; Laurent, Claire; Roque, Eric

    2011-01-01

    This article was written by four French hospital director students at the Ecole des Hautes Etudes en Santé Publique (EHESP-School of Public Health) from a study conducted jointly with students at the Grenoble School of Management to present an international overview of hospital procurement methods in ten countries. An analysis of these methods showed that there was a general trend towards group purchasing, with some common aims in terms of costs and performance and some differences in legislation (competition), size of the public sector and centralization or decentralization.

  7. The Make 2D-DB II package: conversion of federated two-dimensional gel electrophoresis databases into a relational format and interconnection of distributed databases.

    Science.gov (United States)

    Mostaguir, Khaled; Hoogland, Christine; Binz, Pierre-Alain; Appel, Ron D

    2003-08-01

    The Make 2D-DB tool has been previously developed to help build federated two-dimensional gel electrophoresis (2-DE) databases on one's own web site. The purpose of our work is to extend the strength of the first package and to build a more efficient environment. Such an environment should be able to fulfill the different needs and requirements arising from both the growing use of 2-DE techniques and the increasing amount of distributed experimental data.

  8. 48 CFR 752.225-71 - Local procurement.

    Science.gov (United States)

    2010-10-01

    ... 1997) (a) Local procurement involves the use of appropriated funds to finance the procurement of goods... currency of the cooperating country. (b) All locally-financed procurements must be covered by source/origin...

  9. Lively package

    International Nuclear Information System (INIS)

    Jaremko, G.

    1997-01-01

    Progress on the Lloydminster Heavy Oil Interpretive Centre, sponsored by the Lloydminster Oilfield Technical Society and expected to open in late 1998, was discussed. Some $150,000 of the $750,000 budget is already in the bank, and another $150,000 is in the pipeline. The Centre will be added to an existing and well-established visitor's site. It is reported to contain a lively and imaginatively-designed exhibit package, and promises to become a combination of educational tool and tourist attraction for the town of Lloydminster, Saskatchewan, in the heart of heavy oil country

  10. Reflective Packaging

    Science.gov (United States)

    1994-01-01

    The aluminized polymer film used in spacecraft as a radiation barrier to protect both astronauts and delicate instruments has led to a number of spinoff applications. Among them are aluminized shipping bags, food cart covers and medical bags. Radiant Technologies purchases component materials and assembles a barrier made of layers of aluminized foil. The packaging reflects outside heat away from the product inside the container. The company is developing new aluminized lines, express mailers, large shipping bags, gel packs and insulated panels for the building industry.

  11. public procurement, governance and economic growth

    African Journals Online (AJOL)

    GRACE

    (2003: 2), ―strong procurement management in the public sector is a tool for achieving political, economic and social goals‖. Thus .... professionalism in the public sector procurement system (Section 4, PPA, 2007). The functions and powers of the ..... K., Bose, N. and Haque, M.E. (2004). Public Expenditures, Bureaucratic.

  12. 75 FR 47550 - Procurement List; Additions

    Science.gov (United States)

    2010-08-06

    ...--Macintosh Apple NSN: MR 473--Fresh Linen NPA: Industries for the Blind, Inc., West Allis, WI Contracting... Service, 5777 S. Aviation Blvd., N. Charleston, SC NPA: Goodwill Industries of Lower South Carolina, Inc... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be...

  13. 75 FR 22745 - Procurement List Additions

    Science.gov (United States)

    2010-04-30

    ... General Services Administration. Services Service Type/Location: Laundry Services, Alaska VA Healthcare... Procurement List. SUMMARY: This action adds to the Procurement List products and services to be furnished by... concerning capability of qualified nonprofit agencies to provide the products and services and impact of the...

  14. 76 FR 80345 - Procurement List; Additions

    Science.gov (United States)

    2011-12-23

    ... ARMY, W6QL ECC MIAMI DIV, MIAMI, FL. Service Type/Location: Industrial Laundry Service, Bureau of... Procurement List. SUMMARY: This action adds services to the Procurement List that will be provided by... concerning capability of qualified nonprofit agencies to provide the services and impact of the additions on...

  15. 78 FR 48656 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-09

    ... Oceanic and Atmospheric Administration, Boulder, CO. Service Type/Location: Laundry Service, US Coast... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... required to procure the products and services listed below from nonprofit agencies employing persons who...

  16. 77 FR 27736 - Procurement List Additions

    Science.gov (United States)

    2012-05-11

    ... Research Laboratory, Washington, DC. Service Type/Location: Laundry, Refurbishment, and Warehouse Services... Procurement List. SUMMARY: This action adds products and services to the Procurement List that will be... products and services and impact of the additions on the current or most recent contractors, the Committee...

  17. 77 FR 29596 - Procurement List Proposed Additions

    Science.gov (United States)

    2012-05-18

    .../Location: Laundry Service, Veterans Administration Medical Center (VAMC), (offsite: 1809 W 2nd Avenue... Additions to the Procurement List. SUMMARY: The Committee is proposing to add products and services to the... identified in this notice will be required to procure the products and services listed below from nonprofit...

  18. 75 FR 14576 - Procurement List Additions

    Science.gov (United States)

    2010-03-26

    ... Inspection Service, Minneapolis, MN. M.R. Laundry Products NSN: MR 1103--Heavy Duty Laundry Bag. NSN: MR 1104... procurement list. SUMMARY: This action adds to the Procurement List products and services to be furnished by... products and services and impact of the additions on the current or most recent contractors, the Committee...

  19. 22 CFR 226.44 - Procurement procedures.

    Science.gov (United States)

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.44 Procurement procedures. (a... and assistance, as appropriate, of such organizations as the Small Business Administration and the...

  20. Measuring the effect of Sustainable Public Procurement

    NARCIS (Netherlands)

    Zijp MC; Kok L; Valk E de; DMG; M&V; M&V

    2018-01-01

    Many purchasing services of the Dutch local and central governments, aim to include the effects of products and services on human health and the environment in the procurement process. Sustainable procurement (SP) encompasses more than just price and quality considerations. SP can result, for

  1. 42 CFR 457.940 - Procurement standards.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 4 2010-10-01 2010-10-01 false Procurement standards. 457.940 Section 457.940... Integrity § 457.940 Procurement standards. (a) A State must submit to CMS a written assurance that title XXI... public or private payment rates for comparable services for comparable populations, consistent with...

  2. International Research Study of Public Procurement

    NARCIS (Netherlands)

    Telgen, Jan; Harland, C.; Callender, G.; Harland, C.; Nassimbeni, G.; Schneller, E.

    2012-01-01

    In this chapter we examine the specific issue of public procurement, its importance to local, regional, national, and international economies as evidenced in a unique international comparative research study – the International Research Study of Public Procurement (IRSPP). First the public

  3. 7 CFR 210.21 - Procurement.

    Science.gov (United States)

    2010-01-01

    ... Responsibilities § 210.21 Procurement. (a) General. State agencies and school food authorities shall comply with... violation of law are to be referred to the local, State, or Federal authority that has proper jurisdiction... title are followed. A school food authority may use its own procurement procedures which reflect...

  4. 7 CFR 220.16 - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... nature. Matters concerning violation of law are to be referred to the local, State or Federal authority... § 3016.60(b) and (c) of this title are followed. The school food authority may use its own procurement procedures which reflect applicable State and local laws and regulations, provided that procurements made...

  5. 78 FR 45183 - Procurement List Additions

    Science.gov (United States)

    2013-07-26

    ... Requirement as aggregated by the General Services Administration. NSN: 7920-00-NIB-0564--Towel, Cleaning, Non... Procurement List. SUMMARY: This action adds a products and services to the Procurement List that will be... presented to it concerning capability of qualified nonprofit agencies to provide the products and services...

  6. How does procurement capability maturity affect e-Procurement adoption and leverage purchasing in supply chain

    Directory of Open Access Journals (Sweden)

    Pongpanga Pongsuwan

    2016-11-01

    Full Text Available This study refers to the research model of Batenburg (2008 which defined procurement functions to six maturity dimensions; strategy, processes, control, organization, information, e-Technology as the starting point and indicates twenty two items to support capability maturity measurement which is called “Procurement Competitive Capability Maturity”(PCCM. This model is used for a company to assess current practices of procurement function and perceives the level of its capabilities. The data collection is from a survey of fifty-two selected procurement organizations in Southeast Asia (SEA countries; from Thailand, Vietnam, Philippines, Indonesia, Malaysia and Singapore. The objective of this study is to demonstrate the significant value of industry type, size of spending and centralized/decentralized procurement that affect procurement capability maturity. The results show that the industry has no relation to the capability maturity; the size of procurement spend has a positive relation to the capability maturity; and the centralized procurement has higher capability maturity than the decentralized. Moreover, this study extends the knowledge of e-Procurement and digital context to leverage procurement processes and visible procurement integration in an organization and across the supply chain.

  7. Quality assurance in the procurement, design and manufacture of nuclear fuel assemblies

    International Nuclear Information System (INIS)

    1983-01-01

    This Safety Guide provides requirements and recommendations for quality assurance programmes that are relevant for the unique features of the procurement, design, manufacture, inspection, testing, packaging, shipping, storage, and receiving inspection of fuel assemblies for nuclear power plants. The generic quality assurance requirements of the Code and related Safety Guides are referred to where applicable, and are duplicated in this document where increased emphasis is desirable

  8. Measuring effects of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Underway for quite some time now has been the discussion on using public procurement as a means to stimulate innovation. However - with some exceptions this has been mainly a conceptual discussion vastly surpassed a corresponding development of appropriate monitoring tools. Also, even if both...... qualitative and quantitative studies have been made, they tend to lack connection to the underlying mechanisms envisaged in the conceptual and/or case based literature. A challenge in this endeavour prevails in the nature of how public procurement of innovation works. Some of the effects rendered may...... about the usefulness of public procurement of innovation are at all realistic and feasible in practice. After reviewing different currently available means to measure both public procurement of innovation measures, as well as public procurement of innovation, the paper outlines a case-based approach...

  9. Public Procurement of Innovation as Endogenous

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Public procurement used as an innovation policy instrument has attracted attention the last decade. It has been argued that public procurement can be used to stimulate innovation from the demand-side. This paper problematizes ‘demand’ understood as a problem defined by a public procurer given...... to potential suppliers to solve. By drawing on a cross-case analysis of two similar projects the paper attempts to explicate an understanding of the role of public procurement of innovation not primarily as a ‘demand-side innovation instrument’, as such thinking might run the risk of ignoring important...... underlying mechanisms critical for success. Instead the paper views public procurement of innovation as an instrument of endogenous- exogenous knowledge conversion....

  10. ONLINE PROCUREMENT IN SME`s

    Directory of Open Access Journals (Sweden)

    Daniela ICHIM

    2017-12-01

    Full Text Available E-Marketplaces are new business places for buying, selling products and services in many industries to support customers. The emergence of business-to-business (B2B in the online environment has opened up opportunities for effective online transactions between businesses. Research in this area is not enough to offer only fragmented perspectives in this area. Therefore, the targeted research problem was designed to investigate how business performance of online B2B purchases can be analyzed. The proposed study focuses on the online procurement in. Specifically, they try to answer questions such as: Does site, product, and vendor characteristics affect the online procurement in? Does online buying experience influence online procurement by? Participants are that use the Internet to procure products or services. Study respondents were SME managers who believe that online procurement will save time, money and effort, reducing costs.

  11. Decentralized Procurement in Light of Strategic Inventories

    DEFF Research Database (Denmark)

    Frimor, Hans; Arya, Anil; Mittendorf, Brian

    2015-01-01

    The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied and conf......The centralization versus decentralization choice is perhaps the quintessential organizational structure decision. In the operations realm, this choice is particularly critical when it comes to the procurement function. Why firms may opt to decentralize procurement has been often studied...... and confirmed to be a multifaceted choice. This paper complements existing studies by detailing the trade-offs in the centralization versus decentralization decision in light of firm's decision to cede procurement choices to its individual devisions can help moderate inventory levels and provide a natural salve...

  12. Organizational determinants in the procurement and transplantation pathway: a review

    Directory of Open Access Journals (Sweden)

    Triassi M

    2014-12-01

    Full Text Available Maria Triassi,1 Elena Giancotti,2 Antonio Nardone,1 Giulia Mancini,3 Fabiana Rubba1 1Public, Preventive and Social Medicine School, University Federico II of Naples, Naples, Italy; 2Procurement and Transplantation Coordination, Naples, Italy; 3Sociology Unit, G D'annunzio University, Chieti-Pescara, Italy Introduction: The growing disparity between organ availability for transplantation and the number of patients in need has challenged the donation and transplantation community to develop innovative processes, ideas, and techniques to bridge this gap. Advances in the sharing of best practices in the donation community have contributed greatly to this aim over the past 5 years. Studies published during the past five years (2010–2014 were analyzed to gain insight on the evolving organizational areas and tools that the procurement and transplantation pathways have been focused on. The hypothesis assessed is that networking and efficacious handling of this complex path may be ameliorated by an adaptive organizational toolbox. Methods: A thorough search has been conducted using various databases, ie, Cochrane library, PubMed, EMBASE, Federico II University Open Archive. The evidence was considered following the Effective Practice and Organization of Care Group checklist. Prevalent organizational attitudes and areas were assessed, and various scenarios were analyzed. Initially, all titles and abstracts were screened. In the next phase, the full text of all abstracts considered potentially relevant by at least one of the reviewers was evaluated. Inconsistencies in decision-making within this second phase were solved based on consensus between both reviewers. In this phase, for every study we defined whether the organization was considered relevant and what the scenario was. The information was extracted from each study based on bibliographic details (author, journal, year of publication, and language. As many as 1,071 studies were analyzed, and 81

  13. Framework for Structuring Procurement Contracts

    Directory of Open Access Journals (Sweden)

    Lena Borg

    2014-12-01

    Full Text Available The aim of this paper is to propose a new framework for structuring contract types and payment methods. Concerning procurement contracts, the first important new feature of this framework is a stepwise structure with three main steps in the contract design: (1 what will be procured—should the contract only include construction, or should it include both construction and operation/maintenance (2 who will do the detailed design of the premise and (3 how many contractors will the client use? The second important new feature of this framework is that both step 2 and step 3 include a continuum of alternatives. Concerning payment methods, the new framework is primarily based on how the specific risks of the project are shared. These frameworks can be useful for policy formulation in that they can help to avoid some problematic ways of formulating policies.

  14. Traditional Procurement is too Slow

    Directory of Open Access Journals (Sweden)

    Ann Kong

    2012-11-01

    Full Text Available This paper reports on an exploratory interview survey of construction project participants aimed at identifying the reasons for the decrease in use of the traditional, lump-sum, procurement system in Malaysia. The results show that most people believe it is too slow. This appears to be in part due to the contiguous nature of the various phase and stages of the process and especially the separation of the design and construction phases. The delays caused by disputes between the various parties are also seen as a contributory factor - the most prominent cause being the frequency of variations, with design and scope changes being a particular source of discontent. It is concluded that an up scaling of the whole of the time related reward/penalty system may be the most appropriate measure for the practice in future.

  15. Fracture in the Elderly Multidisciplinary Rehabilitation (FEMuR): a phase II randomised feasibility study of a multidisciplinary rehabilitation package following hip fracture.

    Science.gov (United States)

    Williams, Nefyn H; Roberts, Jessica L; Din, Nafees Ud; Totton, Nicola; Charles, Joanna M; Hawkes, Claire A; Morrison, Val; Hoare, Zoe; Williams, Michelle; Pritchard, Aaron W; Alexander, Swapna; Lemmey, Andrew; Woods, Robert T; Sackley, Catherine; Logan, Pip; Edwards, Rhiannon T; Wilkinson, Clare

    2016-10-05

    To conduct a rigorous feasibility study for a future definitive parallel-group randomised controlled trial (RCT) and economic evaluation of an enhanced rehabilitation package for hip fracture. Recruitment from 3 acute hospitals in North Wales. Intervention delivery in the community. Older adults (aged ≥65) who received surgical treatment for hip fracture, lived independently prior to fracture, had mental capacity (assessed by clinical team) and received rehabilitation in the North Wales area. Remote randomisation to usual care (control) or usual care+enhanced rehabilitation package (intervention), including six additional home-based physiotherapy sessions delivered by a physiotherapist or technical instructor, novel information workbook and goal-setting diary. Primary: Barthel Activities of Daily Living (BADL). Secondary measures included Nottingham Extended Activities of Daily Living scale (NEADL), EQ-5D, ICECAP capability, a suite of self-efficacy, psychosocial and service-use measures and costs. Outcome measures were assessed at baseline and 3-month follow-up by blinded researchers. 62 participants were recruited, 61 randomised (control 32; intervention 29) and 49 (79%) completed 3-month follow-up. Minimal differences occurred between the 2 groups for most outcomes, including BADL (adjusted mean difference 0.5). The intervention group showed a medium-sized improvement in the NEADL relative to the control group, with an adjusted mean difference between groups of 3.0 (Cohen's d 0.63), and a trend for greater improvement in self-efficacy and mental health, but with small effect sizes. The mean cost of delivering the intervention was £231 per patient. There was a small relative improvement in quality-adjusted life year in the intervention group. No serious adverse events relating to the intervention were reported. The trial methods were feasible in terms of eligibility, recruitment and retention. The effectiveness and cost-effectiveness of the rehabilitation

  16. Towards the procurement of the ITER divertor

    International Nuclear Information System (INIS)

    Merola, M.; Tivey, R.; Martin, A.; Pick, M.

    2006-01-01

    The procurement of the ITER divertor is planned to start in 2009. On the basis of the present common understanding of the sharing of the ITER components, the Japanese Participating Team (JAPT) will supply the outer vertical target, the Russian Federation (RF) PT the dome liner and will perform the high heat flux testing, the EU PT will supply the inner vertical targets and the cassette bodies, including final assembly of the divertor plasma-facing components (PFCs). The manufacturing of the PFCs of the ITER divertor represents a challenging endeavor due to the high technologies which are involved, and due to the unprecedented series production. To mitigate the associated risks, special arrangements need to be put in place prior to and during procurement to ensure quality and to keep to the time schedule. Before procurement can start, an ITER review of the qualification and production capability of each candidate PT is planned. Well in advance of the assumed start of the procurement, each PT which would like to contribute to the divertor PFC procurement, should first demonstrate its technical qualification to carry out the procurement with the required quality, and in an efficient and timely manner. Appropriate precautions, like subdivision of the procurement into stages, are also to be adopted during the procurement phase to mitigate the consequences of possible unexpected manufacturing problems. In preparation for writing the procurement specification for the vertical targets, the topic of setting acceptance criteria is also being addressed. This activity has the objective of defining workable acceptance criteria for the PFC armour joints. A complete set of analyses is also in progress to assess the latest design modifications against the design requirements. This task includes neutronic, shielding, thermo-mechanical and electromagnetic analyses. More than half of the ITER plasma parameters that must be measured and the related diagnostics are located in the

  17. Mexico - The Federal Procurement System : Challenges and Opportunities

    OpenAIRE

    World Bank

    2007-01-01

    The World Bank carried out the first country procurement assessment review (CPAR) jointly with the Government in 2001, focusing on the features and performance of the federal procurement system. Based on the action plan included in the 2001 CPAR, the government reformed federal procurement laws and regulations in 2005 and furthered the development of Government Procurement Electronic Syste...

  18. 75 FR 49481 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2010-08-13

    ... added to the Procurement List: Services Service Type/Locations: Laundry Service, Atlanta VA Medical...: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement... disabilities and deletes a service from the Procurement List previously furnished by such agency. DATES...

  19. 78 FR 21916 - Procurement List; Addition And Deletions

    Science.gov (United States)

    2013-04-12

    ..., the following service is added to the Procurement List: Service Service Type/Location: Laundry Service...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  20. 22 CFR 201.23 - Procurement under private sector procedures.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Procurement under private sector procedures... § 201.23 Procurement under private sector procedures. (a) General requirements. Procurements under private sector procedures will normally be carried out by importers using negotiated procurement...

  1. Science packages

    Science.gov (United States)

    1997-01-01

    Primary science teachers in Scotland have a new updating method at their disposal with the launch of a package of CDi (Compact Discs Interactive) materials developed by the BBC and the Scottish Office. These were a response to the claim that many primary teachers felt they had been inadequately trained in science and lacked the confidence to teach it properly. Consequently they felt the need for more in-service training to equip them with the personal understanding required. The pack contains five disks and a printed user's guide divided up as follows: disk 1 Investigations; disk 2 Developing understanding; disks 3,4,5 Primary Science staff development videos. It was produced by the Scottish Interactive Technology Centre (Moray House Institute) and is available from BBC Education at £149.99 including VAT. Free Internet distribution of science education materials has also begun as part of the Global Schoolhouse (GSH) scheme. The US National Science Teachers' Association (NSTA) and Microsoft Corporation are making available field-tested comprehensive curriculum material including 'Micro-units' on more than 80 topics in biology, chemistry, earth and space science and physics. The latter are the work of the Scope, Sequence and Coordination of High School Science project, which can be found at http://www.gsh.org/NSTA_SSandC/. More information on NSTA can be obtained from its Web site at http://www.nsta.org.

  2. 49 CFR 178.503 - Marking of packagings.

    Science.gov (United States)

    2010-10-01

    ...) A letter identifying the performance standard under which the packaging design type has been... tests; (4) A designation of the specific gravity or mass for which the packaging design type has been... of the hydrostatic pressure test that the packaging design type has successfully passed; (ii) For...

  3. 40 CFR 30.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... competition when competitive bids or offers are not obtained; and basis for award cost or price. ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 30.46...

  4. 14 CFR 1260.146 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... Higher Education, Hospitals, and Other Non-Profit Organizations Procurement Standards § 1260.146... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  5. 32 CFR 32.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 32.46... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  6. 36 CFR 1210.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  7. 22 CFR 145.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 145... for lack of competition when competitive bids or offers are not obtained, and (c) basis for award cost or price. ...

  8. 2 CFR 215.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ... NON-PROFIT ORGANIZATIONS (OMB CIRCULAR A-110) Post Award Requirements Procurement Standards § 215.46... of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  9. 24 CFR 84.46 - Procurement records.

    Science.gov (United States)

    2010-04-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 84... for lack of competition when competitive bids or offers are not obtained; and (c) Basis for award cost or price. ...

  10. 7 CFR 3019.46 - Procurement records.

    Science.gov (United States)

    2010-01-01

    ...) Justification for lack of competition bids or offers are not obtained, and (c) Basis for award cost or price. ... HIGHER EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement...

  11. 78 FR 38953 - Procurement List Additions

    Science.gov (United States)

    2013-06-28

    ... Blind or Severely Disabled published notices of proposed additions to the Procurement List. After... Punch, Paper, Desktop, 3-Hole, Adjustable, 11 sheet capacity, Metallic Base, Black Grip. Coverage: A...

  12. 78 FR 12295 - Procurement List; Additions

    Science.gov (United States)

    2013-02-22

    ... published notices of proposed additions to the Procurement List. After consideration of the material..., 508 Compliant, 12 Digit, Portable, Desktop, Battery Operated NPA: MidWest Enterprises for the Blind...

  13. Standard Procurement System Use and User Satisfaction

    National Research Council Canada - National Science Library

    2001-01-01

    The audit was performed in response to concerns expressed by the Chairman, House of Representatives Committee on Budget that DoD was not effectively spending Federal funds to acquire the Standard Procurement System (SPS...

  14. Federal Procurement Data System - FPDS API

    Data.gov (United States)

    General Services Administration — The Federal Procurement Data System (FPDS) Next Generation has been re-engineered as a real-time federal enterprise information system. Web services based on SOAP...

  15. Assessment of procurement methods used for executing ...

    African Journals Online (AJOL)

    Assessment of procurement methods used for executing maintenance works in Lagos state. ... Ethiopian Journal of Environmental Studies and Management ... Others are risk allocation, price competition and flexibility of contract. Finally, better ...

  16. 78 FR 40727 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-07-08

    ... for addition to the Procurement List for production by the nonprofit agencies listed: Products Towel.... 12/BX Cleaner, Brake Parts NSN: 6850-01-167-0678--17 oz. NPA: The Lighthouse for the Blind, St. Louis...

  17. 78 FR 35874 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-06-14

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products... Cleaner NPA: Winston-Salem Industries for the Blind, Inc., Winston-Salem, NC Contracting Activity: Defense...

  18. Industry Analysis for Body Armor Procurement

    National Research Council Canada - National Science Library

    Foust, Coleen; Jenson, Christopher

    2006-01-01

    .... In addition, the Office of Management and Budget has required that each agency create strategic sourcing initiatives, monitor the cost savings and report the results to the Office of Federal Procurement Policy...

  19. Turning the Kaleidoscope: Five Perspectives on Procurement

    DEFF Research Database (Denmark)

    Munkgaard Møller, Morten; Vammen, Søren

    Purpose of this paper The purpose of the paper is to provide a conceptual foundation to enhance the body of knowledge related to procurement and sourcing through a framework consisting of five perspectives. The perspectives are: (1) Strategic, (2) Organizational, (3) Capability, (4) Supplier......, and a (5) Customer Perspectives. The aim is to develop a holistic perspective of procurement by applying these five essential, but very different perspectives in order to achieve a holistic picture of the function. Design/methodology/approach The foundation is derived from various well-established theories...... within the five perspectives. Specifically, procurement was viewed from the perspective of organizational theory, network theory, resource/knowledge based views of the firm, transaction cost theory and various theories within the strategic field of research Findings By viewing procurement through...

  20. ASSESSMENT OF PROCUREMENT METHODS USED FOR ...

    African Journals Online (AJOL)

    Osondu

    2012-10-08

    Oct 8, 2012 ... client/or representatives so as to arrive at a tender figure and other ... client have a great influence on maintenance procurement. ... satisfaction and project success and the ... Construction Industries, and Hotels) top the list.

  1. Government Procurement Agreements and Telecommunications Business

    Directory of Open Access Journals (Sweden)

    Shin-Won Kang

    2001-12-01

    Full Text Available The opening of the telecommunications market is acceleration due to the world trends of deregulation and privatization under the WTO basic telecommunications agreements. Diversification of services and fast and efficient equipment procurement are becoming necessary conditions for the survival of telecommunications operators. However, the issue here is that telecommunications operators are still bound by the GPA (Government Procurement Agreement based on conditions of monopoly even though the procurement market in Korean is open substantially since 1997. Under such conditions, the continued application of the GPA on telecommunications operator who is highly competitive may result in a negative impact on the telecommunications business and quality of telecommunications service by undermining the autonomy of operator and decreasing operator’s procurement competitiveness. Therefore, this study examines the GPA and the issues raised by the agreement, and also attempts to suggest revisions or means of abrogating the unfair GPA with regards to the development and deregulation of the telecommunications business.

  2. Does Pharmaceutical Pricing Transparency Matter? Examining Brazil's Public Procurement System.

    Science.gov (United States)

    Kohler, Jillian Clare; Mitsakakis, Nicholas; Saadat, Faridah; Byng, Danalyn; Martinez, Martha Gabriela

    2015-08-04

    We review procurement and pricing transparency practices for pharmaceutical products. We specifically focus on Brazil and examine its approach to increasing pricing transparency, with the aim of determining the level of effectiveness in lower prices using a tool (Banco de Preços em Saúde, BPS) that only reveals purchase prices as compared to other tools (in other countries) that establish a greater degree of price transparency. A general report of Preços em Saúde (BPS) and Sistema Integrado de Administração de Serviços Gerais (SIASG) pricing data was created for 25 drugs that met specific criteria. To explore the linear time trend of each of the drugs, separate regression models were fitted for each drug, resulting in a total of 19 models. Each model controlled for the state variable and the interaction between state and time, in order to accommodate expected heterogeneity in the data. Additionally, the models controlled for procurement quantities and the effect they have on the unit price. Secondary analysis using mixed effects models was also carried out to account for the impact that institutions and suppliers may have upon the unit price. Adjusting for these predictor variables (procurement quantities, supplier, purchasing institution) was important to determine the sole effect that time has had on unit prices. A total of 2 x 19 = 38 models were estimated to explore the overall effect of time on changes in unit price. All statistical analyses were performed using the R statistical software, while the linear mixed effects models were fitted using the lme4 R package. The findings from our analysis suggest that there is no pattern of consistent price decreases within the two Brazilian states during the five-year period for which the prices were analyzed. While the BPS does allow for an increase in transparency and information on drug purchase prices in Brazil, it has not shown to lead to consistent reductions in drug purchase prices for some of the most

  3. Waste-efficient materials procurement for construction projects: A structural equation modelling of critical success factors.

    Science.gov (United States)

    Ajayi, Saheed O; Oyedele, Lukumon O

    2018-05-01

    Albeit the understanding that construction waste is caused by activities ranging from all stages of project delivery process, research efforts have been concentrated on design and construction stages, while the possibility of reducing waste through materials procurement process is widely neglected. This study aims at exploring and confirming strategies for achieving waste-efficient materials procurement in construction activities. The study employs sequential exploratory mixed method approach as its methodological framework, using focus group discussion, statistical analysis and structural equation modelling. The study suggests that for materials procurement to enhance waste minimisation in construction projects, the procurement process would be characterised by four features. These include suppliers' commitment to low waste measures, low waste purchase management, effective materials delivery management and waste-efficient Bill of Quantity, all of which have significant impacts on waste minimisation. This implies that commitment of materials suppliers to such measures as take back scheme and flexibility in supplying small materials quantity, among others, are expected of materials procurement. While low waste purchase management stipulates the need for such measures as reduced packaging and consideration of pre-assembled/pre-cut materials, efficient delivery management entails effective delivery and storage system as well as adequate protection of materials during the delivery process, among others. Waste-efficient specification and bill of quantity, on the other hand, requires accurate materials take-off and ordering of materials based on accurately prepared design documents and bill of quantity. Findings of this study could assist in understanding a set of measures that should be taken during materials procurement process, thereby corroborating waste management practices at other stages of project delivery process. Copyright © 2018. Published by Elsevier Ltd.

  4. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 1. Building Procurement Capacity and Systems

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  5. Flexible procurement systems is key to supply chain sustainability

    Directory of Open Access Journals (Sweden)

    Surajit Bag

    2016-04-01

    Full Text Available Background: In this dynamic business environment, manufacturers are focusing primarily on delivery performance and competitive pricing to win orders. It is essential that manufacturers adopt flexible procurement systems (FPSs in such an uncertain environment for business sustainability. Objectives: The purpose of the study is to identify the elements of FPSs and model the interrelationships between elements of FPSs and, finally, to understand how FPSs are linked with supply chain sustainability. Method: Besides providing a brief conceptual review of FPSs, the study largely illustrates the use of an innovative multi-criteria decision-making approach called total interpretive structural modelling (TISM. Results: The total interpretive structural modelling–based model evaluates the causality and illustrates elements with interpretation of relations and suggests that bottom-level elements are vital for sustainability in FPSs and avert risks. Secondly, strategic sourcing is positively influencing supplier integration. Thirdly, supplier integration positively influences supplier responsiveness. Fourthly, skills of flexible procurement workforce positively influence supplier integration. Fifthly, it is found that supplier integration positively influences flexible transportation. The sixth finding suggests that supplier integration positively influences eco-friendly packaging. The seventh finding highlights that supplier integration positively influences ISO 14001 certifications. The eighth finding explains that supplier responsiveness positively influences customer satisfaction. It is also observed that flexible transport reduces operational cost and environmental costs. The second last finding explains eco-friendly packaging and reduction in environmental cost by careful selection of packing material and chemicals. Lastly, it is found that ISO 14001/environmental certifications reduce environmental costs by greening suppliers and pressurises them

  6. Utility procurement policies in the USA

    International Nuclear Information System (INIS)

    Lurf, G.; Nikazmerad, N.M.

    1983-01-01

    The subject is discussed under the headings: introduction; market history (historical uranium demand and production in the USA); recent long-term contract activity (expected US reactor demand and uranium production; expected US reactor demand and contracted uranium supplies); utility procurement attitudes; impact of inventories on procurement; current regulatory environment (spot-market price vs average long-term contract price); embargo and imports; conclusion. (U.K.)

  7. Factors influencing global antiretroviral procurement prices.

    Science.gov (United States)

    Wirtz, Veronika J; Forsythe, Steven; Valencia-Mendoza, Atanacio; Bautista-Arredondo, Sergio

    2009-11-18

    Antiretroviral medicines (ARVs) are one of the most costly parts of HIV/AIDS treatment. Many countries are struggling to provide universal access to ARVs for all people living with HIV and AIDS. Although substantial price reductions of ARVs have occurred, especially between 2002 and 2008, achieving sustainable access for the next several decades remains a major challenge for most low- and middle-income countries. The objectives of the present study were twofold: first, to analyze global ARV prices between 2005 and 2008 and associated factors, particularly procurement methods and key donor policies on ARV procurement efficiency; second, to discuss the options of procurement processes and policies that should be considered when implementing or reforming access to ARV programs. An ARV-medicines price-analysis was carried out using the Global Price Reporting Mechanism from the World Health Organization. For a selection of 12 ARVs, global median prices and price variation were calculated. Linear regression models for each ARV were used to identify factors that were associated with lower procurement prices. Logistic regression models were used to identify the characteristics of those countries which procure below the highest and lowest direct manufactured costs. Three key factors appear to have an influence on a country's ARV prices: (a) whether the product is generic or not; (b) the socioeconomic status of the country; (c) whether the country is a member of the Clinton HIV/AIDS Initiative. Factors which did not influence procurement below the highest direct manufactured costs were HIV prevalence, procurement volume, whether the country belongs to the least developed countries or a focus country of the United States President's Emergency Plan For AIDS Relief. One of the principal mechanisms that can help to lower prices for ARV over the next several decades is increasing procurement efficiency. Benchmarking prices could be one useful tool to achieve this.

  8. Best Value Procurement - The Practical Approach

    OpenAIRE

    Storteboom, Arnoud

    2017-01-01

    Traditional procurement methods leave much room for improving risk management and value creation. However, Best Value Procurement (BVP) is designed to increase project value by mitigating risks and increasing the transparency by underscoring the pre-award phase. This shift in paradigm is reached by following a sequence of elements with the principles of transparency, performance information measuring and contractor clarification. The BVP philosophy is developed in the USA. Following is ...

  9. Empirical Analysis of Competition in Procurement Auctions

    OpenAIRE

    Tukiainen, Janne

    2008-01-01

    A vast amount of public services and goods are contracted through procurement auctions. Therefore it is very important to design these auctions in an optimal way. Typically, we are interested in two different objectives. The first objective is efficiency. Efficiency means that the contract is awarded to the bidder that values it the most, which in the procurement setting means the bidder that has the lowest cost of providing a service with a given quality. The second objective is to maximize ...

  10. Multidimensional procurement auctions with unknown weights

    DEFF Research Database (Denmark)

    Greve, Thomas

    This paper studies the consequences of holding a procurement auction when the principal chooses not to show its preferences. My paper extends the procurement auction model of Che (1993) to a situation where both the principal and the agents have private information. Thus, unknown parameters of bo...... gives rise to an analysis of a principal that can not fully commit to the outcome induced by the scoring rule. Therefore, my result apply to contract theory and it’s problems with imperfect commitment....

  11. International public procurement: From scant facts to hard data

    OpenAIRE

    Cernat, Lucian; Kutlina-Dimitrova, Zornitsa

    2015-01-01

    Public procurement is a negotiating area gaining in importance at multilateral and bilateral level, as evidenced by a brief review of procurement provisions in existing trade agreements. The size of procurement spending stands in most developed economies at double-digit percentage points of GDP. However, despite the size and importance of these markets, the factual information available to trade negotiators remains scarce. Although public procurement patterns (e.g. size of procurement markets...

  12. What Is the Status of Indonesian E-Procurement?

    OpenAIRE

    Achmad Nurmandi

    2013-01-01

    E-procurement is an important intrument to prevent corruption in goods and services procurement budget. Indonesia has been implementing the e-procurement project since 2008 based on Presidential Decree. President has stipulating annual order (presidential instruction) has to be obey by all ministries and local governments to procure their budget through r-procurement mechanism. However, untill 2012 fiscal year, this research found that only around 10.26% of central government institution proc...

  13. The Malaysian Public Procurement's Prevalent System and its Weaknesses

    OpenAIRE

    Rohana Othman; Husein Zakaria; Norlaili Nordin; Zamzam Shahidan; Kamaruzaman Jusoff

    2010-01-01

    Problem statement: This study examined the public procurement system as prevalent in the Malaysian government system of administration. Various aspects of public procurement are outlined including types and the processes that entail public procurement. This study also highlighted the weaknesses in the manual public procurement processes that are opened to potential abuse and mismanagement resulting in corruption. This study places the Malaysian Government public procurement system under the s...

  14. Procurement management in scientific research and production project

    International Nuclear Information System (INIS)

    Wan Yi

    2008-01-01

    To meet the requirement of development trend of scientific research and production, it is necessary to incorporate the modern procurement management theory in the whole procurement process for the items used in scientific research and production.This paper provided some suggestions to improve the procurement management by introducing the experiences in the application of the modern procurement management methods in the procurement of parts production. (author)

  15. An evaluation of transit procurement training.

    Science.gov (United States)

    Noland, Robert B; Weiner, Marc D; Klein, Nicholas J; Puniello, Orin D

    2017-04-01

    We evaluated a training course called "Orientation to Transit Procurement", designed and conducted by the National Transit Institute. This course is designed to provide Federal Transit Administration (FTA) grantees an overview of regulations and best practices related to the procurement process. Our objective in conducting the evaluation was to understand how transit agency staff made changes in procurement practices in response to the course training. The evaluation was mixed mode: an Internet survey followed by in-depth interviews with a small group of respondents. Survey respondents were also provided with an open-ended question providing us with additional context for our evaluation. Results show that the training is substantially successful at meeting the goal of improving procurement practices at transit agencies; indeed, most respondents report making changes at their agencies as the proximate result of the training. This was at odds with our exploration of knowledge of procurement topics, as most respondents gave inaccurate answers on multiple-choice "knowledge questions". This may have been due to question structure or, more likely, the nature of online surveys. Suitable training on the procurement of information technology was also a main concern. The lack of training in this area is indicative of the broader challenge facing public transit agencies in how to incorporate new forms of technology into their existing practices and bureaucratic structures. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Donor selection criteria and procurement

    International Nuclear Information System (INIS)

    Agcaoili, N.R.

    1999-01-01

    Donor selection is one of the most important aspects of tissue banking practice. Without a good donor selection criteria, the results of any effort of trying to preserve tissues will have disastrous outcome for the recipient of these tissues. While with a very good and strict donor selection the Tissue Bank can guarantee safe and effective tissue allografts. There are significant aspects in the history and physical examination of the donor that must be emphasized. A donor exclusion criteria has also been formulated together with a list of all the needed laboratory examinations to eliminate possible diseases that may be transferred from the donor. The methods of procurement of tissue allografts from living and cadaver donors will be described. The limitations and advantages of each will be taken.There are also special restrictions that are important in the practice of removing the tissues from the donors. All the necessary equipment should be ready and the potential risk on the personnel should be known to all doing Tissue Banking

  17. Performance-oriented packagings for hazardous materials: Resource guide

    International Nuclear Information System (INIS)

    1993-09-01

    This document provides recommendations to US Department of Energy (DOE) shippers regarding packaging that meet performance-oriented packaging requirements implemented by US Department of Transportation (DOT) in rulemaking HM-181 (December 21, 1990) and subsequent actions. The packaging described in this document are certified by their vendor to comply with requirements for Packing Group I, II, or III hazardous materials packaging. The intent of this document is to share information between DOE and contractors and at all DOE facilities

  18. Performance-oriented packagings for hazardous materials: Resource guide

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    This document provides recommendations to US Department of Energy (DOE) shippers regarding packaging that meet performance-oriented packaging requirements implemented by US Department of Transportation (DOT) in rulemaking HM-181 (December 21, 1990) and subsequent actions. The packaging described in this document are certified by their vendor to comply with requirements for Packing Group I, II, or III hazardous materials packaging. The intent of this document is to share information between DOE and contractors and at all DOE facilities.

  19. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    2008-01-01

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

  20. CH Packaging Operations Manual

    International Nuclear Information System (INIS)

    2009-01-01

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing 'Short' 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing 'Tall' 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

  1. CH Packaging Operations Manual

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-05-27

    This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

  2. Cornea procurement, preservation and transplantation

    International Nuclear Information System (INIS)

    Hudson Silva

    1999-01-01

    Our experience on this subject is 40 years and we have seen the developments everywhere during this total period. Cornea procurement has been an unsurmountable problem in a large number of countries, mostly due to social and cultural reasons. The requirements for a simple eye bank to manage the supply for a local hospital are minimal. What is the most important is the donor base. In Sri Lanka nurtured in the traditions of Theravada Buddhism the donor base was easy to prepare. We had no difficulties with Christians and Hindus. For Muslims there are Fatwas in favour of donating eyes. But we always found them to be a reluctant group. But in predominantly Muslim countries, it is imperative that social workers should take up this issue, so those thousands may be helped. In all areas where attempts are made to procure comeas, it is important to have a day-and-night service available at short notice to collect any eyes offered. A trained technician with sterilised instruments to obtain eyes and blood sample must be available at a convenient location preferably in a large hospital. Even in places where the supply is infrequent, it is essential to have the readily-sterilised instruments to proceed to a donor site at short notice. To get eyes, general publicity in mass media alone is not sufficient. Such publicity makes people aware of the need for donor eyes and where a technician/doctor is available. What is more important is to canvass personally after a person has died For this purpose trained social workers may be employed, or the technician can do the motivation, as we do in Sri Lanka. Once eyes are removed, it is essential to pay careful attention to the appearance of the cadaver. It should not (and need not) cause any deformity as such event has a profound negative effect on the campaign. Many different preservation methods have been used over the years. Mc Carey-Kaufmann (MK) medium has been the standard for many years, and gives a life span of 4-5 days. The formula

  3. System design document for the plutonium stabilization and packaging system

    International Nuclear Information System (INIS)

    1996-01-01

    The objective of this system is to stabilize and package plutonium metals and oxides of greater than 50% wt, as well as other selected isotopes, in accordance with the requirements for DOE standards for safe storage of these materials for 50 years. This document describes the highest level design information and user characteristics from an operational perspective. It provides guidance for developing procurement and installation specifications, interface requirements, and test plans

  4. System design document for the plutonium stabilization and packaging system

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-05-08

    The objective of this system is to stabilize and package plutonium metals and oxides of greater than 50% wt, as well as other selected isotopes, in accordance with the requirements for DOE standards for safe storage of these materials for 50 years. This document describes the highest level design information and user characteristics from an operational perspective. It provides guidance for developing procurement and installation specifications, interface requirements, and test plans.

  5. Solid-State Polymerization of Poly(Ethylene Furanoate Biobased Polyester, II: An Efficient and Facile Method to Synthesize High Molecular Weight Polyester Appropriate for Food Packaging Applications

    Directory of Open Access Journals (Sweden)

    Nejib Kasmi

    2018-04-01

    Full Text Available The goal of this study was to synthesize, through a facile strategy, high molecular weight poly(ethylene furanoate (PEF, which could be applicable in food packaging applications. The efficient method to generate PEF with high molecular weight consists of carrying out a first solid-state polycondensation under vacuum for 6 h reaction time at 205 °C for the resulting polymer from two-step melt polycondensation process, which is catalyzed by tetrabutyl titanate (TBT. A remelting step was thereafter applied for 15 min at 250 °C for the obtained polyester. Thus, the PEF sample was ground into powder, and was then crystallized for 6 h at 170 °C. This polyester is then submitted to a second solid-state polycondensation (SSP carried out at different reaction times (1, 2, 3.5, and 5 h and temperatures 190, 200, and 205 °C, under vacuum. Ultimately, a significant increase in intrinsic viscosity is observed with only 5 h reaction time at 205 °C during the second SSP being needed to obtain very high molecular weight PEF polymer greater than 1 dL/g, which sufficient for manufacturing purposes. Intrinsic viscosity (IV, carboxyl end-group content (–COOH, and thermal properties, via differential scanning calorimetry (DSC, were measured for all resultant polyesters. Thanks to the post-polymerization process, DSC results showed that the melting temperatures of the prepared PEF samples were steadily enhanced in an obvious way as a function of reaction time and temperature increase. It was revealed, as was expected for all SSP samples, that the intrinsic viscosity and the average molecular weight of PEF polyester increased with increasing SSP time and temperature, whereas the number of carboxyl end-group concentration was decreased. A simple kinetic model was also developed and used to predict the time evolution of polyesters IV, as well as the carboxyl and hydroxyl end-groups of PEF during the SSP.

  6. Transformation of fraud activities in procurement system in Indonesia

    Science.gov (United States)

    Setiani, N.; Huda, S. N.; Pulungan, R.; Winarko, E.

    2017-03-01

    E-procurement has been applied in Indonesia since 2008 through the adoption of Electronic Procurement System (SPSE). The purpose of the use of SPSE in the procurement process is to improve the efficiency of goods or services procurement. In the bidding process, intensive communication and data exchange between providers and organizers are urgently needed. Through SPSE, the frequency of face to face meetings between providers and the committee can be reduced. This is expected to minimize potential fraud behaviors in the goods or services procurement conducted through the tender process. There exists a transformation of activities in the procurement through SPSE from the tender process that was previously done manually. In this paper, we analyze this transformation between manual procurement process and SPSE-based procurement process. The result of the analysis is exploited for investigating the possibility of fraud behavior transformations in every phase of e-procurement activities.

  7. Networking for knowledge capacity building of procurement professionals in Ghana

    Directory of Open Access Journals (Sweden)

    Kissi Ernest

    2016-12-01

    Full Text Available The role of public procurement professionals in achieving value for money in public procurement activities is widely acknowledged around the globe. This has inspired the organisation of training programmes and workshops for procurement professionals, particularly those in developing countries in order to hone their knowledge and skills for proper management of government projects. This paper sought to explore the opportunities in networking for knowledge capacity building of procurement professionals in Ghana. The study adopted quantitative research methods for both data collection and analysis. The paper revealed that professional networking can offer procurement professionals the opportunity to acquire new knowledge from external professionals, know global trends about procurement practice, and obtain new information from other institutions about procurement. It is recommended that a platform that can support a network of procurement professionals in Ghana should be developed in order to ensure effective interaction and communication among procurement professionals for their capacity building.

  8. PUBLIC PROCUREMENT IN GHANA: THE IMPLEMENTATION CHALLENGES TO THE PUBLIC PROCUREMENT LAW 2003 (ACT 663

    Directory of Open Access Journals (Sweden)

    Ameyaw, Collins

    2012-08-01

    Full Text Available The purpose of this study was to identify various implementation bottlenecks to the Ghana Public Procurement Law 2003 (Act 663. The study adopted multiple research approaches, including; review of relevant literature, interviews and questionnaire survey of 49 District Assemblies and Metropolitan and Municipal Assemblies in the Ashanti and Brong Ahafo Regions of Ghana. The study identified low capacity of procurement professionals, low interaction between procurement entities and Public Procurement Authority (PPA, deliberate controlling of competition, non-compliance with provisions of the law, splitting of contracts into smaller lots, lack of funds and non-cooperativeness of suppliers, as the major challenges militating against the implementation of the Public Procurement Law.

  9. IEA Task 24 Solar procurement 2000

    Energy Technology Data Exchange (ETDEWEB)

    Ellehauge, K.; Oestergaard, I. [Teknologisk Institut, Taastrup. SolEnergiCentret (Denmark); Gramkow, L. [Esbensen, Copenhagen (Denmark)

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  10. IEA Task 24 Solar procurement 2000

    International Nuclear Information System (INIS)

    Ellehauge, K.; Oestergaard, I.; Gramkow, L.

    2002-04-01

    The objective of the project is to develop and improve large procurements of solar heating systems in order to be able to place large orders with manufacturers and suppliers. The project work will be carried out as an international co-operation under IEA Task 24 with the title 'Solar Procurement'. By co-ordinating the effort between the 4-6 participating countries, the objective is to purchase at least 10,000 solar heating systems, of this amount 1,000-2,000 in Denmark. Such large orders make it possible for manufacturers and suppliers to deliver systems considerably cheaper, and it will be possible to develop systems for given specifications on output and efficiency. These co-ordinated large orders are expected to improve the price/efficiency conditions by up to 50%. The so called 'procurement process' (co-ordinated international procurement based on goal-oriented system development in co-operation between customers and suppliers/manufacturers) will in the project be followed up by information/marketing, education, financing schemes, service schemes, quality assurance and technical support. The project is divided into two main areas (IEA subtasks). 1: 'Procurement and Marketing' and 2: 'Creation of Tools'. Denmark has been requested to be the project manager of subtask 2, 'Creation of Tools'. (EHS)

  11. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Directory of Open Access Journals (Sweden)

    E A S Nelson

    Full Text Available BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA and Vaccine Procurement Baseline (VPB are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP that governments spend on their own vaccine procurement. OBJECTIVE: To determine realistic targets for VPA and VPB. METHODS: Organization for Economic Co-Operation and Development (OECD and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC countries disbursed (as % of GDP in current US$ for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. FINDINGS: In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013% and United Kingdom (0.0085% disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024% and Canada (0.008% made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. CONCLUSIONS: Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a vaccine procurement; and b immunization programs.

  12. Monitoring what governments "give for" and "spend on" vaccine procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline.

    Science.gov (United States)

    Nelson, E A S; Bloom, David E; Mahoney, Richard T

    2014-01-01

    The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of the share of Gross Domestic Product (GDP) that governments spend on their own vaccine procurement. To determine realistic targets for VPA and VPB. Organization for Economic Co-Operation and Development (OECD) and World Bank data for 2009 were analyzed to determine the proportions of bilateral ODA from the 23 Development Assistance Committee (DAC) countries disbursed (as % of GDP in current US$) for infectious disease control. DAC country contributions to the GAVI Alliance for 2009 were assessed as a measure of multilateral donor support for vaccines and immunization programs. In 2009, total DAC bilateral ODA was 0.16% of global GDP and 0.25% of DAC GDP. As a percentage of GDP, Norway (0.013%) and United Kingdom (0.0085%) disbursed the greatest proportion of bilateral ODA for infectious disease control, and Norway (0.024%) and Canada (0.008%) made the greatest contributions to the GAVI Alliance. In 2009 0.02% of DAC GDP was US$7.61 billion and 0.02% of the GDP of the poorest 117 countries was US$2.88 billion. Adopting 0.02% GDP as minimum targets for both VPA and VPB is based on realistic estimates of what both developed and developing countries should spend, and can afford to spend, to jointly ensure procurement of vaccines recommended by national and global bodies. New OECD purpose codes are needed to specifically track ODA disbursed for a) vaccine procurement; and b) immunization programs.

  13. Diagnostics of Procurement Activity of Industrial Enterprise

    OpenAIRE

    Veretennikova Anna B.

    2012-01-01

    The importance of procurement activity of industrial enterprise is substantiated in the article. The results of the critical analysis of the existing approaches to procurement effectiveness evaluating are presented. The main directions of diagnostics of procurement activity of industrial enterprise such as the quality of the organization and the resources, the effectiveness and efficiency, security of logistics operations.В статье обоснована актуальность диагностирования закупочной деятельнос...

  14. Waste package performance assessment

    International Nuclear Information System (INIS)

    Lester, D.H.

    1981-01-01

    This paper describes work undertaken to assess the life-expectancy and post-failure nuclide release behavior of high-level and waste packages in a geologic repository. The work involved integrating models of individual phenomena (such as heat transfer, corrosion, package deformation, and nuclide transport) and using existing data to make estimates of post-emplacement behavior of waste packages. A package performance assessment code was developed to predict time to package failure in a flooded repository and subsequent transport of nuclides out of the leaking package. The model has been used to evaluate preliminary package designs. The results indicate, that within the limitation of model assumptions and data base, packages lasting a few hundreds of years could be developed. Very long lived packages may be possible but more comprehensive data are needed to confirm this

  15. Organ procurement after euthanasia: Belgian experience.

    Science.gov (United States)

    Ysebaert, D; Van Beeumen, G; De Greef, K; Squifflet, J P; Detry, O; De Roover, A; Delbouille, M-H; Van Donink, W; Roeyen, G; Chapelle, T; Bosmans, J-L; Van Raemdonck, D; Faymonville, M E; Laureys, S; Lamy, M; Cras, P

    2009-03-01

    Euthanasia was legalized in Belgium in 2002 for adults under strict conditions. The patient must be in a medically futile condition and of constant and unbearable physical or mental suffering that cannot be alleviated, resulting from a serious and incurable disorder caused by illness or accident. Between 2005 and 2007, 4 patients (3 in Antwerp and 1 in Liège) expressed their will for organ donation after their request for euthanasia was granted. Patients were aged 43 to 50 years and had a debilitating neurologic disease, either after severe cerebrovascular accident or primary progressive multiple sclerosis. Ethical boards requested complete written scenario with informed consent of donor and relatives, clear separation between euthanasia and organ procurement procedure, and all procedures to be performed by senior staff members and nursing staff on a voluntary basis. The euthanasia procedure was performed by three independent physicians in the operating room. After clinical diagnosis of cardiac death, organ procurement was performed by femoral vessel cannulation or quick laparotomy. In 2 patients, the liver, both kidneys, and pancreatic islets (one case) were procured and transplanted; in the other 2 patients, there was additional lung procurement and transplantation. Transplant centers were informed of the nature of the case and the elements of organ procurement. There was primary function of all organs. The involved physicians and transplant teams had the well-discussed opinion that this strong request for organ donation after euthanasia could not be waived. A clear separation between the euthanasia request, the euthanasia procedure, and the organ procurement procedure is necessary.

  16. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2010-01-01

    strong requirements on the management style and company culture. Limitations of the research: The research is only based on two case studies, which obviously limits the possibility to generalize the results. Practical applications: The research presents two specific examples of innovative procurement......Aim: The aim of the paper is to present, analyse and identify learning from two case studies of innovative procurement in Facilities Management (FM) concerning the establishments of partnerships between clients and providers. Approach and methodology: A major study of FM best practice covering 36...

  17. Greening Non-Product-Related Procurement

    DEFF Research Database (Denmark)

    Mosgaard, Mette; Riisgaard, Henrik; Huulgaard, Rikke Dorothea

    2013-01-01

    link to the strategy for greening private consumption, as similarities exist and the purchasers lean on their private experiences when purchasing non-product related items; and finally, 3) Intensify the efforts in product categories in which strict normative legislation makes management more motivated....... environmental benefits of millions of procurement decisions do add up to large environmental improvement potentials. Thus, non-product-related procurement focuses on the similarities in the purchases made across different sectors. Explorative interviews with purchasers in Danish companies form the basis...

  18. Spare parts classification and procurement program

    International Nuclear Information System (INIS)

    Adlon, K.L.; Hassaballa, M.M.

    1986-01-01

    The cost benefits have been demonstrated for an integrated program, which is currently being implemented for two PWR stations with two 1100-MW units each. The component classification efforts reduced the number of safety-related components in several systems. Furthermore, the knowledge of the component specific function has contributed to the reduction of many safety-related parts per component, in addition to ensuring the procurement of parts to the correct safety level. The use of qualified commercial grade parts and components with their lower cost and reasonable procurement lead time compared to their 10 CFR 21 counterparts has a pronounced economic effect on the utility balance sheets

  19. Vascularized Composite Allografts: Procurement, Allocation, and Implementation.

    Science.gov (United States)

    Rahmel, Axel

    Vascularized composite allotransplantation is a continuously evolving area of modern transplant medicine. Recently, vascularized composite allografts (VCAs) have been formally classified as 'organs'. In this review, key aspects of VCA procurement are discussed, with a special focus on interaction with the procurement of classical solid organs. In addition, options for a matching and allocation system that ensures VCA donor organs are allocated to the best-suited recipients are looked at. Finally, the different steps needed to promote VCA transplantation in society in general and in the medical community in particular are highlighted.

  20. Sustainable Procurement in the United Nations

    DEFF Research Database (Denmark)

    Lund-Thomsen, Peter; Costa, Nives

    2011-01-01

    are highly contested among UN procurement officers and member states. However, so far the debate has mostly been based on assumptions about how the implementation of SP might affect developing country stakeholders. In fact, very few academic studies have been made of the economic, social and environmental......This paper deals with the integration of economic, social and environmental criteria into the purchasing practices of the United Nations (UN) system--also known as the UN engagement in sustainable procurement (SP). We argue that the debates about the pros and cons of the UN engaging in SP...

  1. Controlled procurement for nuclear power plants

    International Nuclear Information System (INIS)

    MacFarlane, I.S.

    1985-01-01

    A method is presented for establishing a controlled materials management system that facilitates materials procurement at nuclear power plants. This method is based on the determination of informational data requirements, appropriate input and approvals, and extent of administrative controls. Implementation of the techniques described herein will ensure that the accuracy of important procurement information is not compromised by unauthorized initial input or changes and/or failure to maintain the information. Needed material can thus be ordered through the materials management system with a high degree of confidence that the correct items are ordered, with minimal internal lead time and minimum delays during the receiving process

  2. Packaging for Food Service

    Science.gov (United States)

    Stilwell, E. J.

    1985-01-01

    Most of the key areas of concern in packaging the three principle food forms for the space station were covered. It can be generally concluded that there are no significant voids in packaging materials availability or in current packaging technology. However, it must also be concluded that the process by which packaging decisions are made for the space station feeding program will be very synergistic. Packaging selection will depend heavily on the preparation mechanics, the preferred presentation and the achievable disposal systems. It will be important that packaging be considered as an integral part of each decision as these systems are developed.

  3. Waste Package Lifting Calculation

    International Nuclear Information System (INIS)

    H. Marr

    2000-01-01

    The objective of this calculation is to evaluate the structural response of the waste package during the horizontal and vertical lifting operations in order to support the waste package lifting feature design. The scope of this calculation includes the evaluation of the 21 PWR UCF (pressurized water reactor uncanistered fuel) waste package, naval waste package, 5 DHLW/DOE SNF (defense high-level waste/Department of Energy spent nuclear fuel)--short waste package, and 44 BWR (boiling water reactor) UCF waste package. Procedure AP-3.12Q, Revision 0, ICN 0, calculations, is used to develop and document this calculation

  4. Management of Contracts for F110 Engine Procurements

    National Research Council Canada - National Science Library

    Granetto, Paul

    2001-01-01

    This audit was performed in response to an allegation to the Defense Hotline that the Wright-Patterson Air Force Base Procurement Contracting Office made poor procurement decisions on F110 aircraft engine contracts...

  5. GPP Webinar: Solar Procurement Templates and Tools for Higher Education

    Science.gov (United States)

    Green Power Partnership webinar on solar procurement for Higher Education which features various tools and templates that schools can use to shape and manage the solar procurement process to a successful outcome.

  6. Design of reactive power procurement in deregulated electricity market

    African Journals Online (AJOL)

    user

    novel reactive power procurement model is proposed, which ensure secure and ..... The simulation is performed in the Matlab. .... focus of this paper is a reactive procurement market model, which is a basically two-step optimization process.

  7. 76 FR 37069 - Procurement List; Proposed Additions and Deletion

    Science.gov (United States)

    2011-06-24

    ... Certification The following products and service are proposed for addition to Procurement List for production by... following product is proposed for deletion from the Procurement List: Product Detergent, Laundry NSN: 7930...

  8. Innovation public procurement in Russia: problems of institutional arrangements

    Directory of Open Access Journals (Sweden)

    Korytcev Maxim, A.

    2015-12-01

    Full Text Available The paper explores the problems of public procurement in innovation sphere in Russia, its institutional organization. In international practice, some strategies of innovation stimulation (by public procurement are developing. There is necessity to use more elements of these strategies in Russian National Procurement System. The active National Public Procurement System has no enough effective methods and instruments for stimulating innovation development now.

  9. Merganser Download Package

    Data.gov (United States)

    U.S. Environmental Protection Agency — This data download package contains an Esri 10.0 MXD, file geodatabase and copy of this FGDC metadata record. The data in this package are used in support of the...

  10. Creative Thinking Package

    Science.gov (United States)

    Jones, Clive

    1972-01-01

    A look at the latest package from a British managment training organization, which explains and demonstrates creative thinking techniques, including brainstorming. The package, designed for groups of twelve or more, consists of tapes, visuals, and associated exercises. (Editor/JB)

  11. Effects of Procurement Related Factors on Construction Project ...

    African Journals Online (AJOL)

    Several Literatures in construction management support the view that procurements have impacts on project performance. Aim of this study is to investigate the effects of procurement related factors of procurement selection criteria, tendering methods and variation orders on project performance. Purpose of the study is to ...

  12. 7 CFR 235.9 - Procurement and property management standards.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management standards. 235.9... Procurement and property management standards. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 concerning the procurement of supplies, equipment and other services with State...

  13. 41 CFR 101-26.507-2 - Procurement time schedule.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedule. 101-26.507-2 Section 101-26.507-2 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND...

  14. 7 CFR 248.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 248.21 Section... Provisions § 248.21 Procurement and property management. (a) Requirements. State agencies shall comply with the requirements of 7 CFR part 3016 for procurement of supplies, equipment and other services with...

  15. 41 CFR 101-26.501-5 - Procurement time schedules.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement time schedules. 101-26.501-5 Section 101-26.501-5 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT...

  16. 76 FR 78248 - Procurement List; Addition and Deletions

    Science.gov (United States)

    2011-12-16

    .... Service Type/Location: Laundry Service, Stratton Medical Center, 113 Holland Ave, Albany, NY. [[Page 78249...: Addition to and Deletions from the Procurement List. SUMMARY: This action adds a service to the Procurement... disabilities, and deletes products and services from the Procurement List previously furnished by such agencies...

  17. Greening Operations Management: An Online Sustainable Procurement Course for Practitioners

    Science.gov (United States)

    Walker, Helen L.; Gough, Stephen; Bakker, Elmer F.; Knight, Louise A.; McBain, Darian

    2009-01-01

    In the Operations Management field, sustainable procurement has emerged as a way to green the purchasing and supply process. This paper explores issues in sustainable procurement training. The authors formed an interdisciplinary team to design, deliver and evaluate a training programme to promote and develop sustainable procurement in the United…

  18. Nepal : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focused on the degree of readiness of Government of Nepal's (GoN's) current public procurement environment for making a transition from a traditional paper-based, manual procurement transaction processing and communication to electronic government procurement (e-GP). Some 20 public and private sector organizations, involved in a wide range of functions that relate to public...

  19. Maldives : Electronic Government Procurement Readiness Assessment and Roadmap

    OpenAIRE

    World Bank

    2007-01-01

    The assessment focuses on the degree of readiness of Government of The Maldives's (GoTM's) current public procurement environment for making a transition from traditional paper-based, manual methods of procurement transaction processing and communication to electronic government procurement (e-GP). The e-GP Assessment was discussed individually with informed respondents in the public and p...

  20. Study on Comparative Efficiencies in Vaccine Procurement Mechanisms

    OpenAIRE

    Bumpas, Janet

    2008-01-01

    Vaccinations are amongst the most cost-effective public health interventions. Vaccine procurement is a complex issue that interweaves the domains of public health, commodity security, ethics, and procurement. Its cross-disciplinary nature means that neither a straightforward analysis stemming from just one discipline nor a cookie-cutter application of World Bank procurement principles of e...

  1. 32 CFR 22.205 - Distinguishing assistance from procurement.

    Science.gov (United States)

    2010-07-01

    ... procurement contract, is the appropriate instrument, based on the following: (a) Purpose. (1) The grants... purpose is acquisition, then the grants officer shall judge that a procurement contract is the appropriate... 32 National Defense 1 2010-07-01 2010-07-01 false Distinguishing assistance from procurement. 22...

  2. Procurement maturity, alignment and performance: a Dutch hospital case comparison.

    NARCIS (Netherlands)

    Plomp, M.; Batenburg, R.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  3. Procurement Maturity, Alignment and Performance: a Dutch Hospital Case Comparison

    NARCIS (Netherlands)

    Plomp, M.G.A.; Batenburg, R.S.

    2009-01-01

    Procurement is an important supporting business function, with which competitive advantage can potentially be achieved. In this paper, the relation between maturity and alignment in procurement on the one hand, and procurement performance on the other, is investigated in the case study setting of

  4. 41 CFR 101-26.602-4 - Procurement of coal.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of coal. 101... PROGRAM 26.6-Procurement Sources Other Than GSA § 101-26.602-4 Procurement of coal. (a) Federal agencies desiring to participate in the Defense Fuel Supply Center coal contracting program for carload delivery...

  5. 20 CFR 627.420 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... sources, unless it is demonstrated that the JTPA-funded alternative services or facilities would be more...) Each State and subrecipient shall conduct procurements in a manner which provides full and open... pricing practices between firms or organizations or between affiliated companies or organizations; (iv...

  6. 38 CFR 49.46 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ..., HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS Post-Award Requirements Procurement Standards § 49.46... of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. (Authority: Pub. L. 104-156; 110 Stat. 1396) ...

  7. 45 CFR 2541.360 - Procurement.

    Science.gov (United States)

    2010-10-01

    ... foster greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and... procured, and when necessary, shall set forth those minimum essential characteristics and standards to... grantee or subgrantee desires to have the review accomplished after a solicitation has been developed, the...

  8. 20 CFR 437.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... greater economy and efficiency, grantees and subgrantees are encouraged to enter into State and local... procured, and when necessary, must set forth those minimum essential characteristics and standards to which... desires to have the review accomplished after a solicitation has been developed, SSA may still review the...

  9. Online Reverse Auctions for Procurement of Services

    NARCIS (Netherlands)

    U.L. Radkevitch (Uladzimir)

    2008-01-01

    textabstractOnline reverse auctions, in which a buyer seeks to select a supplier and suppliers compete for contracts by bidding online, revolutionized corporate procurement early this century. Shortly after they had been pioneered by General Electric, many companies rushed to adopt reverse auctions

  10. 21 CFR 1403.36 - Procurement.

    Science.gov (United States)

    2010-04-01

    ... be a selection criteria provided its application leaves an appropriate number of qualified firms... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Procurement. 1403.36 Section 1403.36 Food and.... No employee, officer or agent of the grantee or subgrantee shall participate in selection, or in the...

  11. Procurement of medical equipment in Sweden

    Directory of Open Access Journals (Sweden)

    Heikki Terio

    2010-02-01

    Full Text Available In many hospitals in Sweden the importance of technology management is already accepted and accepted since the hospital managements have recognised that technology is an integral part of all major policy and planning decisions. Today’s medical devices are technically complex and sometimes a system of interacting devices is required to achieve the desired clinical function. If the hospitals want to use the latest, modern technology, then they need to make substantial investments in both equipment and competence. Complex technology, large investments and need of highly qualii ed personnel to handle the medical devices are factors that indicate a need of well-dei ned procurement process as an essential part of the total health technology management system that should be used in a hospital. In such a procurement process, carefully prepared planning of technology investments can reduce the running costs and costs for maintenance substantially. In addition, a well-dei ned procurement process contributes to increase the patient safety. In Karolinska University Hospital goods and services are purchased for more than 20% of the hospital’s €1.2 billion turnover. It is therefore very important that the procurement is carried out ef ectively.

  12. 78 FR 59658 - Procurement List; Additions

    Science.gov (United States)

    2013-09-27

    ... Accordingly, the following products and services are added to the Procurement List: Products Laundry Net... ADMINISTRATION, BOULDER, CO. Service Type/Location: Laundry Service, US Coast Guard Base, Portsmouth, VA. NPA... GUARD, BASE PORTSMOUTH, PORTSMOUTH, VA Service Type/Location: Laundry Service, Federal Bureau of Prisons...

  13. Pre-commercial procurement : regulatory effectiveness?

    NARCIS (Netherlands)

    Apostol, Anca Ramona

    2014-01-01

    Is public procurement of research and development (‘R&D’) services the key to European Union (‘EU’)’s sustainable welfare? Is it being regulated in accordance with economic prescripts for effectiveness? Is the regulatory and policy setting clear and comprehensive in order to stimulate a widespread

  14. 78 FR 34351 - Procurement List; Additions

    Science.gov (United States)

    2013-06-07

    .... ADDRESSES: Committee for Purchase from People Who are Blind or Severely Disabled, 1401 S. Clark Street... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions AGENCY: Committee for Purchase from People Who are Blind or Severely Disabled. ACTION: Additions to the...

  15. 78 FR 53734 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-08-30

    ...: Committee for Purchase From People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  16. 78 FR 77105 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-12-20

    ... People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  17. 78 FR 50040 - Procurement List, Proposed Additions

    Science.gov (United States)

    2013-08-16

    ... People Who Are Blind or Severely Disabled, 1401 S Clark Street, Suite 10800, Arlington, Virginia, 22202... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List, Proposed Additions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  18. 78 FR 19248 - Procurement List; Proposed Addition

    Science.gov (United States)

    2013-03-29

    ... Purchase From People Who Are Blind or Severely Disabled, 1401 S. Clark Street, Suite 10800, Arlington... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Proposed Addition AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Proposed...

  19. Organ procurement from executed prisoners in China.

    Science.gov (United States)

    Sharif, A; Singh, M Fiatarone; Trey, T; Lavee, J

    2014-10-01

    Organ procurement from executed prisoners in China is internationally condemned, yet this practice continues unabated in 2014. This is despite repeated announcements from Chinese authorities that constructive measures have been undertaken to conform to accepted ethical standards. While there is unanimous agreement on the unethical nature of using organs from executed prisoners, due to its limitations on voluntary and informed consent, there is insufficient coverage of forced organ procurement from prisoners of conscience without consent. Strategies to influence positive change in China over the last few decades have failed to bring this practice to an end. While organ donation and transplantation services in China have undergone considerable structural changes in the last few years, fundamental attempts to shift practice to ethically sourced organs have floundered. In this article, we discuss the organ trade in China, reflect upon organ procurement from executed prisoners (including both capital prisoners and prisoners of conscience) and provide an overview of contradictory Chinese efforts to halt forced organ procurement from executed prisoners. Finally, we highlight current actions being taken to address this issue and offer comprehensive recommendations to bring this ethically indefensible practice to an immediate end. © Copyright 2014 The American Society of Transplantation and the American Society of Transplant Surgeons.

  20. Issues in organ procurement, allocation, and transplantation.

    Science.gov (United States)

    Nierste, Deborah

    2013-01-01

    Organ transplantation extends lives and improves health but presents complex ethical dilemmas for nurses caring for donors, recipients, and their families. This article overviews organ procurement and allocation, discusses ethical dilemmas in transplantation, and offers strategies from professional and biblical perspectives for coping with moral distress and maintaining compassionate care.

  1. 77 FR 70738 - Procurement List Additions

    Science.gov (United States)

    2012-11-27

    ... Fire Fighters, Metal NSN: CBFF0053--Nameplate, Navy Fire Fighters, 2 Line, Metal NSN: CBFF0054--Collar, Brass, Navy Fire Fighters, Metal NSN: CBFF0055--Shorts, Navy Fire Fighters, Physical Training, Small... following products are added to the Procurement List: PRODUCTS: NSN: CBFF0001--Shirt, Navy Fire Fighters...

  2. SMEs cooperate to meet social procurement conditions

    NARCIS (Netherlands)

    Oden, Petra

    2015-01-01

    A growing amount of (semi) public organizations in the Netherlands write tenders with mandatory social conditions. It is important for SMEs to focus on social procurement in their business strategy. SMEs should be proactive and try to affect the conditions (semi) public organizations write in their

  3. 76 FR 57719 - Procurement List; Proposed Additions

    Science.gov (United States)

    2011-09-16

    ... proposed for addition to the Procurement List for production by the nonprofit agencies listed: Products NSN: 7930-00-NIB-0583--Refills, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0584--Starter Kit, Bathroom Cleaner and Deodorizer, Cartridge Concentrate. NSN: 7930-00-NIB-0585...

  4. 78 FR 12296 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-02-22

    ... services are proposed for addition to the Procurement List for production by the nonprofit agencies listed... and Trailer Wash, 55 GL NSN: 7930-00-NIB-0649--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 5 GL NSN: 7930-00-NIB-0650--Cleaner/Degreaser, Heavy Duty, Biodegradable, Car and Trucks, 55 GL...

  5. 36 CFR 1207.36 - Procurement.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 3 2010-07-01 2010-07-01 false Procurement. 1207.36 Section 1207.36 Parks, Forests, and Public Property NATIONAL ARCHIVES AND RECORDS ADMINISTRATION GENERAL RULES... resonableness can be established on the basis of a catalog or market price of a commercial product sold in...

  6. Antiretroviral procurement and supply chain management.

    Science.gov (United States)

    Ripin, David J; Jamieson, David; Meyers, Amy; Warty, Umesh; Dain, Mary; Khamsi, Cyril

    2014-01-01

    Procurement, the country-level process of ordering antiretrovirals (ARVs), and supply chain management, the mechanism by which they are delivered to health-care facilities, are critical processes required to move ARVs from manufacturers to patients. To provide a glimpse into the ARV procurement and supply chain, the following pages provide an overview of the primary stakeholders, principal operating models, and policies and regulations involved in ARV procurement. Also presented are key challenges that need to be addressed to ensure that the supply chain is not a barrier to the goal of universal coverage. This article will cover the steps necessary to order and distribute ARVs, including different models of delivery, key stakeholders involved, strategic considerations that vary depending on context and policies affecting them. The single drug examples given illustrate the complications inherent in fragmented supply and demand-driven models of procurement and supply chain management, and suggest tools for navigating these hurdles that will ultimately result in more secure and reliable ARV provision. Understanding the dynamics of ARV supply chain is important for the global health community, both to ensure full and efficient treatment of persons living with HIV as well as to inform the supply chain decisions for other public health products.

  7. Procurement Officer | IDRC - International Development Research ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... efficient, and ethical and provide the best possible value to the IDRC; supporting the ... procurement processes are perceived by suppliers as fair, open and ethical; ... while ensuring to protect confidential information;; analyses, negotiates and ... and knowledge, and interpret, assess and communicate current IDRC policy, ...

  8. 78 FR 73504 - Procurement List; Proposed Additions

    Science.gov (United States)

    2013-12-06

    ... Logistics Support Detachment, Undisclosed Location*, Ft. Belvoir, VA. NPA: MVLE, Inc., Springfield, VA. Contracting Activity: Directorate of Contracting Procurement Logistics Support Detachment, Fort Belvoir, VA.... Lineback, Director, Business Operations. [FR Doc. 2013-29139 Filed 12-5-13; 8:45 am] BILLING CODE 6353-01-P ...

  9. 77 FR 60969 - Procurement List; Additions

    Science.gov (United States)

    2012-10-05

    ... Are Blind or Severely Disabled published a notice for additions to the Procurement List with the... Committee for Purchase From People Who Are Blind or Severely Disabled published notices of proposed..., Phoenix, AZ. Service Type/Location: Custodial and Grounds Maintenance Services, Austin Courthouse, 501...

  10. Packaging Printing Today

    OpenAIRE

    Stanislav Bolanča; Igor Majnarić; Kristijan Golubović

    2015-01-01

    Printing packaging covers today about 50% of all the printing products. Among the printing products there are printing on labels, printing on flexible packaging, printing on folding boxes, printing on the boxes of corrugated board, printing on glass packaging, synthetic and metal ones. The mentioned packaging are printed in flexo printing technique, offset printing technique, intaglio halftone process, silk – screen printing, ink ball printing, digital printing and hybrid printing process. T...

  11. Genome packaging in viruses

    OpenAIRE

    Sun, Siyang; Rao, Venigalla B.; Rossmann, Michael G.

    2010-01-01

    Genome packaging is a fundamental process in a viral life cycle. Many viruses assemble preformed capsids into which the genomic material is subsequently packaged. These viruses use a packaging motor protein that is driven by the hydrolysis of ATP to condense the nucleic acids into a confined space. How these motor proteins package viral genomes had been poorly understood until recently, when a few X-ray crystal structures and cryo-electron microscopy structures became available. Here we discu...

  12. Trends in Food Packaging.

    Science.gov (United States)

    Ott, Dana B.

    1988-01-01

    This article discusses developments in food packaging, processing, and preservation techniques in terms of packaging materials, technologies, consumer benefits, and current and potential food product applications. Covers implications due to consumer life-style changes, cost-effectiveness of packaging materials, and the ecological impact of…

  13. Granger Causality and National Procurement Spending: Applications to the CC130 Hercules Fleet Performance

    Science.gov (United States)

    2011-09-01

    intentionally left blank. ii DRDC CORA TM 2011-154 Dr aft Co py Executive summary Granger Causality and National Procurement Spending David W...à croire que la chaîne d’approvisionnement sous jacente est optimale - la résistance aux chocs de dépenses peut simplement s’expliquer par des stocks...i Executive summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . iii Sommaire

  14. Forward Commitment Procurement : A practical methodology that helps to manage risk in procuring innovative goods and services

    NARCIS (Netherlands)

    Whyles, G.; Meerveld, H. van; Nauta, N.J.

    2015-01-01

    The Forward Commitment Procurement (FCP) is a Public Procurement of Innovation (PPI) methodology. It was specifically designed to both provide a practical methodology for procurers to follow and to manage the perceived risk of the customer and supplier in innovation investments. The paper describes

  15. How does the knowledge environment shape procurement practices for orthopaedic medical devices in Mexico?

    Science.gov (United States)

    Lingg, Myriam; Wyss, Kaspar; Durán-Arenas, Luis

    2016-07-08

    In organisational theory there is an assumption that knowledge is used effectively in healthcare systems that perform well. Actors in healthcare systems focus on managing knowledge of clinical processes like, for example, clinical decision-making to improve patient care. We know little about connecting that knowledge to administrative processes like high-risk medical device procurement. We analysed knowledge-related factors that influence procurement and clinical procedures for orthopaedic medical devices in Mexico. We based our qualitative study on 48 semi-structured interviews with various stakeholders in Mexico: orthopaedic specialists, government officials, and social security system managers or administrators. We took a knowledge-management related perspective (i) to analyse factors of managing knowledge of clinical procedures, (ii) to assess the role of this knowledge and in relation to procurement of orthopaedic medical devices, and (iii) to determine how to improve the situation. The results of this study are primarily relevant for Mexico but may also give impulsion to other health systems with highly standardized procurement practices. We found that knowledge of clinical procedures in orthopaedics is generated inconsistently and not always efficiently managed. Its support for procuring orthopaedic medical devices is insufficient. Identified deficiencies: leaders who lack guidance and direction and thus use knowledge poorly; failure to share knowledge; insufficiently defined formal structures and processes for collecting information and making it available to actors of health system; lack of strategies to benefit from synergies created by information and knowledge exchange. Many factors are related directly or indirectly to technological aspects, which are insufficiently developed. The content of this manuscript is novel as it analyses knowledge-related factors that influence procurement of orthopaedic medical devices in Mexico. Based on our results we

  16. The problems of accountable and analytical procuring of enterprise management

    Directory of Open Access Journals (Sweden)

    Kovalova Tatiana Volodymyrivna

    2016-02-01

    Full Text Available This article investigated main aspects of accountable and analytical procuring of enterprise management. It was found essence of accountable and analytical procuring of enterprise management, purpose, functions and tasks. It was determined main elements and essence of accountable and analytical information taking into consideration needs of modern management. In the article are exposed structural elements of accountable and analytical procuring. It was formed conceptual approaches of building accountable and analytical procuring of enterprise management. It was analyzed main problems of improving accountable and analytical informational procuring of taking managerial decisions with the aim of solving economic problems due to current situation of national economy.

  17. Potential fraudulent behaviors in e-procurement implementation in Indonesia

    Science.gov (United States)

    Huda, S. N.; Setiani, N.; Pulungan, R.; Winarko, E.

    2017-03-01

    Corruptions in public procurement have occurred in various parts of the world, especially in developing countries. Implementation of SPSE (electronic procurement system) as the e-procurement system in Indonesia is based on the government’s intentions towards clean and good governance by fighting corruption, collusion, and nepotism. Procurement in Indonesia is carried out through SPSE, which is developed by LKPP (Government Policy on Procurement of Goods/Services). Although this system has brought many positive effects, there are still found many practices of fraud occurring in the implementation of the system. In this paper, we try to identify these practices and then to systematically categorize and analyze them.

  18. Active Packaging Coatings

    Directory of Open Access Journals (Sweden)

    Luis J. Bastarrachea

    2015-11-01

    Full Text Available Active food packaging involves the packaging of foods with materials that provide an enhanced functionality, such as antimicrobial, antioxidant or biocatalytic functions. This can be achieved through the incorporation of active compounds into the matrix of the commonly used packaging materials, or by the application of coatings with the corresponding functionality through surface modification. The latter option offers the advantage of preserving the packaging materials’ bulk properties nearly intact. Herein, different coating technologies like embedding for controlled release, immobilization, layer-by-layer deposition, and photografting are explained and their potential application for active food packaging is explored and discussed.

  19. Advancements in meat packaging.

    Science.gov (United States)

    McMillin, Kenneth W

    2017-10-01

    Packaging of meat provides the same or similar benefits for raw chilled and processed meats as other types of food packaging. Although air-permeable packaging is most prevalent for raw chilled red meat, vacuum and modified atmosphere packaging offer longer shelf life. The major advancements in meat packaging have been in the widely used plastic polymers while biobased materials and their integration into composite packaging are receiving much attention for functionality and sustainability. At this time, active and intelligent packaging are not widely used for antioxidant, antimicrobial, and other functions to stabilize and enhance meat properties although many options are being developed and investigated. The advances being made in nanotechnology will be incorporated into food packaging and presumably into meat packaging when appropriate and useful. Intelligent packaging using sensors for transmission of desired information and prompting of subsequent changes in packaging materials, environments or the products to maintain safety and quality are still in developmental stages. Copyright © 2017 Elsevier Ltd. All rights reserved.

  20. Edible packaging materials.

    Science.gov (United States)

    Janjarasskul, Theeranun; Krochta, John M

    2010-01-01

    Research groups and the food and pharmaceutical industries recognize edible packaging as a useful alternative or addition to conventional packaging to reduce waste and to create novel applications for improving product stability, quality, safety, variety, and convenience for consumers. Recent studies have explored the ability of biopolymer-based food packaging materials to carry and control-release active compounds. As diverse edible packaging materials derived from various by-products or waste from food industry are being developed, the dry thermoplastic process is advancing rapidly as a feasible commercial edible packaging manufacturing process. The employment of nanocomposite concepts to edible packaging materials promises to improve barrier and mechanical properties and facilitate effective incorporation of bioactive ingredients and other designed functions. In addition to the need for a more fundamental understanding to enable design to desired specifications, edible packaging has to overcome challenges such as regulatory requirements, consumer acceptance, and scaling-up research concepts to commercial applications.

  1. Public perspectives on biospecimen procurement: what biorepositories should consider.

    Science.gov (United States)

    L'Heureux, Jamie; Murray, Jeffrey C; Newbury, Elizabeth; Shinkunas, Laura; Simon, Christian M

    2013-06-01

    Human biospecimens are central to biobanking efforts, yet how members of the public think about biobank procurement strategies is not well understood. This study aimed to explore public perspectives toward the procurement of residual clinical material versus "direct" procurement strategies such as the drawing of blood. Members of the public residing in and beyond the biobank catchment area of the University of Iowa Hospitals and Clinics were randomly selected to participate in focus groups and a telephone survey. The majority of survey participants (75%, n=559) found both residual and direct procurement strategies equally workable. Small proportions preferred either residual (15%; n=117) or direct (5%; n=40) procurement. Focus group participants (n=48) could identify benefits to both procurement strategies, but raised concerns about possible donor inconvenience/discomfort and reduced biospecimen accrual in the case of direct procurement. Residual procurement raised concerns about lower-quality samples being procured without full donor awareness. Biobanks should consider that members of the public in their research programs may be willing to make specimen donations regardless of whether a residual or direct procurement strategy is employed. Limiting patient discomfort and inconvenience may make direct procurement strategies more acceptable to some members of the public. Ensuring donor awareness through effective informed consent may allay public concerns about the indirectness of donating clinical biospecimens.

  2. EIA and green procurement: Opportunities for strengthening their coordination

    International Nuclear Information System (INIS)

    Uttam, Kedar; Faith-Ell, Charlotta; Balfors, Berit

    2012-01-01

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: ► This paper identifies opportunities to link EIA and green procurement. ► Pre-decision phase of EIA could be appropriate for planning green procurement. ► Future research should investigate the mechanism for establishing the link.

  3. EIA and green procurement: Opportunities for strengthening their coordination

    Energy Technology Data Exchange (ETDEWEB)

    Uttam, Kedar, E-mail: kedar@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden); Faith-Ell, Charlotta, E-mail: charlotta.faith-ell@WSPGroup.se [WSP Sweden (Sweden); Balfors, Berit, E-mail: balfors@kth.se [Department of Land and Water Resources Engineering, Royal Institute of Technology, Stockholm (Sweden)

    2012-02-15

    EIA plays an important role in enhancing the environmental performance of the construction sector. In recent years, the construction sector has been developing green procurement practices. Green procurement is a process that involves the incorporation of environmental requirements during the procurement of services and products. However, discussion on green procurement is rarely seen during the EIA phase. This paper addresses possible opportunities for improving the coordination between EIA and green procurement within the construction sector. The linking of EIA and green procurement has been postulated in the paper as an aid to strengthen the coordination between project planning and implementation. The paper is based on a literature review and is an outcome of an on-going research project concerning EIA and green procurement. This study indicated that it would be appropriate to introduce green procurement during the pre-decision phase of an EIA. In the present study, the opportunities for integrating green procurement at the stage of EIA are associated with the integration of project planning and EIA. Future research should investigate the mechanism through which the link can be established. - Highlights: Black-Right-Pointing-Pointer This paper identifies opportunities to link EIA and green procurement. Black-Right-Pointing-Pointer Pre-decision phase of EIA could be appropriate for planning green procurement. Black-Right-Pointing-Pointer Future research should investigate the mechanism for establishing the link.

  4. Monitoring What Governments “Give for” and “Spend on” Vaccine Procurement: Vaccine Procurement Assistance and Vaccine Procurement Baseline

    OpenAIRE

    Nelson, E. A. S.; Bloom, David E.; Mahoney, Richard T.

    2014-01-01

    BACKGROUND: The Global Vaccine Action Plan will require, inter alia, the mobilization of financial resources from donors and national governments - both rich and poor. Vaccine Procurement Assistance (VPA) and Vaccine Procurement Baseline (VPB) are two metrics that could measure government performance and track resources in this arena. VPA is proposed as a new subcategory of Official Development Assistance (ODA) given for the procurement of vaccines and VPB is a previously suggested measure of...

  5. Quality assurance inspections in the transportation packaging supplier industry

    International Nuclear Information System (INIS)

    Jankovich, J.P.

    1991-01-01

    In this paper the quality assurance inspections of the transportation packaging supplier industry, conducted by the U.S. Nuclear Regulatory Commission (NRC) on a routine basis since 1989 are discussed. The term supplier is used to include designers, fabricators, and distributors that hold NRC approved Quality Assurance Programs and Certificates of Compliance for packagings to transport radioactive materials. The objective of the inspections is to provide assurance that transportation packagings are fabricated and procured in accordance with 10 CFR Parts 21 and 71 requirements. The inspections are conducted in a systematic and comprehensive manner, utilizing uniform inspection techniques in order to assure uniformity and comparability. During the April 1989 and May 1991 period approximately 21 inspections were conducted by the Transportation Branch, Office of Nuclear Material Safety and Safeguards of the NRC. The majority of the findings were identified in the areas of quality assurance procedures, control of special processes (e.g. welding, radiography), and maintenance of QA records

  6. Launch of the "MICE Procurement" website for your future events

    CERN Multimedia

    The MICE Office team

    2014-01-01

    The number of MICE (Meeting, Incentive, Conference and Event) requests is on the increase and our hotel offer is constantly being developed.   The MICE Office has decided to create a dedicated website in order to offer the best possible service to its users. This site is accessible from the FP webpage (MICE Procurement) using your NICE login. It gives you access to the list of the establishments which have a contract with CERN, grouped by geographic area/star rating, and all related information. The establishments listed on this website can accommodate your local events, organised by CERN or in partnership with an institution. They were selected following a market survey and as a result of a price enquiry in accordance with CERN's Purchasing Rules. We offer a number of standard packages, but we will try to respond to any specific requirements. On the same site you can also access a longer list of hotels (also accessible via the GS website) for which prices and conditions have been nego...

  7. Climate accounting for waste management, Phase I and II. Summary: Phase 1: Glass Packaging, Metal packaging, paper, cardboard, plastic and wet organic waste. Phase 2: Wood waste and residual waste from households; Klimaregnskap for avfallshaandtering, Fase I og II. Sammendrag: Fase 1: Glassemballasje, metallemballasje, papir, papp, plastemballasje og vaatorganisk avfall. Fase 2: Treavfall og restavfall fra husholdninger

    Energy Technology Data Exchange (ETDEWEB)

    Raadal, Hanne Lerche; Modahl, Ingunn Saur; Lyng, Kari-Anne

    2009-09-15

    involves the lowest greenhouse gas load for the types of waste glass packaging, metal packaging and plastic packaging. Biological treatment (biogas production) provides the lowest GHG (greenhouse gas) impact for the treatment of wet organic waste. Energy recovery provides the lowest GHG impact for the treatment of paper, cardboard and wood waste. Disposal provides the greatest greenhouse gas load for all the analyzed types of waste, but plastic and glass containers. For waste composition has a major impact on greenhouse gas emissions for the landfill and the energy efficiency of the waste. The composition varies both with the types of waste disposed and with what kind of source separation schemes offered in the various municipalities. This in turn can vary depending on population density (urban areas / cities versus scattered buildings), and motivation of the individual citizen to source sorting. Energy recovery means the lowest greenhouse gas emissions for an 'average composite' residual waste in Norway. Analysis of residual waste should always be considered in context with the total amounts and handling of sorted out waste types, as well as total amounts and composition of residual waste. This is important to achieve a comprehensive assessment and avoid suboptimalization. Transport related greenhouse gas emissions are generally of relatively little importance in relation to the environmental benefits arising from the material and / or energy utilization. 3. The model is used to calculate the net greenhouse gas emissions resulting from disposal of a total of approximately 4.1 million tons of waste from households, industry, construction and service industries. 4. Analysis of a realistic optimal scenario for disposal of household waste show that this system can be virtually carbon-neutral. 5. The choice of which assumptions to be incorporated in this type of analysis depends on the purpose of analysis, in addition to local and geographical conditions. 6. Relevant

  8. Collaborative procurement for developing a sustainable campus

    Science.gov (United States)

    Nifa, Faizatul Akmar Abdul; Rahim, Syukran Abdul; Rani, Wan Nurul Mardiah Wan Mohd; Ismail, Mohd. Noorizhar

    2016-08-01

    It is particularly challenging to achieve sustainability in campus universities, where a high volume of users and activities has made it more imperative to promote green buildings that reduce energy and water consumption while having a minimal carbon footprint. At present, the frameworks for sustainable campus have seldom focused on the project procurement method which would improve construction team integration in developing the physical aspect of campus development. Therefore, in response to that challenge, this paper investigates how the delivery team, responsible for the design and construction of a project, can be integrated to work together more efficiently and more using the collaborative procurement method known as partnering. This paper reports part of a previous research and sets the base for ongoing research on the critical factors in partnering for sustainable campus development. The outcome or result of this study will meet and support the requirement for construction, maintenance, and operation process for universities towards sustainable building/campus in the future.

  9. Green related practices for construction procurement

    Science.gov (United States)

    Bidin, Z. A.; Bohari, A. A. M.; Rais, S. L. A.; Saferi, M. M.

    2018-04-01

    Environment degradation issue has been a worldwide problem and various efforts have been done to minimise the problem. Construction sectors are pointed as one of the major contributors to its construction activities. Green-oriented procurement [GP] is considered as an environmental strategy to integrate the environmental practices into the construction delivery. Thus, this paper reviews the concept of GP and the practices related to it. The outcome of this research findings provides a basis for understanding the concept of GP and the further development of GP. The listed GP practices identified from this paper can serve as guidelines for industry practitioners to design, implement, and benchmarking the green practices in their procurement delivery.

  10. Innovative Procurement and Partnerships in Facilities Management

    DEFF Research Database (Denmark)

    Jensen, Per Anker

    2011-01-01

    A major study of facilities management best practice covering 36 cases from the Nordic countries in Europe shows, that the most outstanding examples of innovation in FM are initiated from the demand side and involves new forms of procurement with long term contracts. This paper considers in depth......-called operational partnerships with private providers concerning all municipal buildings and sports facilities in parts of a city. Each of the case studies has involved both the client and the provider side of the collaboration. The cases show that an essential element in a successful procurement and partnership...... is that the client allows the providers freedom to plan their activities. Thereby the providers can optimize the use of their productive capacity and utilize their competences with incentives to profit from such improvements. A major challenge is to balance the risks between the client and provider and to create...

  11. Public Procurement: A performance management perspective

    OpenAIRE

    Klevensparr, Johan

    2016-01-01

    Purpose - The purpose of this thesis is to explore what performance indicators that exist within public procurement in defence sector context and how such performance indicators can be categorized.   Methodology - For the purpose of this thesis, an abductive approach was applied. This thesis is characterized as an exploratory multimethod qualitative research, which emphasize a single case study and a comprehensive research literature review. The empirical data was collected using semi-structu...

  12. Socially Responsible Award of the Procurement Contracts

    OpenAIRE

    Hristina Blagoycehva

    2013-01-01

    With the Europe 2020 strategy the EU has set itself, under conditions of a changing world, the goal of becoming an intelligent, sustainable and inclusive economy. Under the current conditions of budget constraints and economic difficulties the conventional mechanisms for promoting social justice and social cohesion are insufficient. Through the inclusion of social criteria in the awarding of public procurement there can be guaranteed the compliance with social insurance legislation, furthered...

  13. Innovation, Procurement and Construction Industry Development

    Directory of Open Access Journals (Sweden)

    Geard de Valence

    2010-12-01

    Full Text Available The implications for analysis of innovation in construction of theoretical developments in industrial organisation are considered in this research, as an attempt to outline a new approach to construction innovation incorporating the ideas found in knowledge based, technology centred models. The paper firstly summarises characteristics of the construction industry, focusing on their effects on innovation, before surveying some of the ideas about the sources of innovation and the expansion and application of knowledge. Construction can be seen as an industry with limited scope for knowledge externalities, where the procurement methods used by the industry’s clients do not pay for innovation. The following discussion uses recent developments in the research on the economics of innovation and industrial organization theory, such as research intensity and the endogenous sunk costs in competitive, fragmented, low research intensity industries. The effects on R&D of procurement methods and on industry structure are discussed, with a focus on the appropriability of innovations and the role of the client on the Heathrow Terminal 5 project. The paper concludes that the procurement methods used for building and construction projects appears to be a determining factor in the level of innovation in the construction industry

  14. New harvesting technology in forest fuel procurement

    Energy Technology Data Exchange (ETDEWEB)

    Raitila, J. (VTT Technical Research Centre of Finland, Jyvaeskylae (Finland)), Email: jyrki.raitila@vtt.fi; Kaerhae, K. (Metsaeteho Oy, Helsinki (Finland)), Email: kalle.karha@metsateho.fi; Jylhae, P. (Finnish Forest Research Inst., Kannus (Finland)), Email: paula.jylha@metla.fi; Laitila, J. (Finnish Forest Research Inst., Joensuu (Finland)), Email: juha.laitila@metla.fi

    2009-07-01

    In order to increase the use of forest fuels, a regional development project was launched in the fall of 2008. The co-ordinator of the project is Metsaekeskus Keski-Suomi (Forestry Centre of Central Finland), while VTT (Technical Research Centre of Finland) is in charge of research and technical development. The aim of this project is to enhance energy wood procurement from early thinnings, to develop the supply chains of pine stump extraction, and to reduce storage losses of energy wood at roadside landings and at terminals. The results of a pre-feasibility study on the first-generation feller-bundler (Fixteri) by Metsaeteho Oy and the Finnish Forest Research Institute indicates that whole-tree bundling might enable undercutting of the current costs of separate procurement of pulp-wood and energy wood from first-thinning stands. The greatest cost-saving potential lies in small-diameter (d{sub 1.3} = 7-10 cm) first-thinning stands, which are currently relatively unprofitable sites for conventional pulpwood procurement based on single-tree harvesting. Preliminary tests of seasoning of whole-tree bundles have been very encouraging. In some cases the moisture content of energy wood bundles has decreased from 55 % to 25 % after about year of seasoning at the roadside (two summers). One of the most promising devices for pine stump harvesting was developed by Karelian Puu ja Metalli Oy. (orig.)

  15. Paid organ procurement: pragmatic and ethical viewpoints.

    Science.gov (United States)

    Daar, A S

    2004-09-01

    None of the familiar arguments against paid organ procurement really works. Most arguments spring from revulsion that arises from the abuses of the practice rather than the act itself. This has not stopped official condemnation. However, the evidence we have at present is that such condemnation, aimed at correcting a perceived moral wrong rather than at abuses of a practice (the correction of which might actually bring some moral good), has utterly failed, and many more countries including the United States now harbor paid organ procurement. We can try to develop and articulate a truly compelling moral argument against paid organ procurement or we can try to minimize the harm that comes out of this practice. Since it is unlikely that all countries will agree on a standardized approach in such a muddled field, the best way may be to let every country decide on what is best for itself. Some may want to ban the practice using legislation. Others may want to try regulating the practice, knowing full well that they cannot stop it and that turning a blind eye to the practice, or simply condemning it, does no good whatsoever and actually increases the harm because everything is done underground, with middlemen and mafia-like organizations making a lot of money out of a lot of misery. Some countries may choose to find other, more innovative solutions. We call attention to an important resolution dealing with this subject at the December 2002 ethics and transplantation congress in Munich.

  16. Healthy Food Procurement Policies and Their Impact

    Science.gov (United States)

    Niebylski, Mark L.; Lu, Tammy; Campbell, Norm R. C.; Arcand, Joanne; Schermel, Alyssa; Hua, Diane; Yeates, Karen E.; Tobe, Sheldon W.; Twohig, Patrick A.; L’Abbé, Mary R.; Liu, Peter P.

    2014-01-01

    Unhealthy eating is the leading risk for death and disability globally. As a result, the World Health Organization (WHO) has called for population health interventions. One of the proposed interventions is to ensure healthy foods are available by implementing healthy food procurement policies. The objective of this systematic review was to evaluate the evidence base assessing the impact of such policies. A comprehensive review was conducted by searching PubMed and Medline for policies that had been implemented and evaluated the impact of food purchases, food consumption, and behaviors towards healthy foods. Thirty-four studies were identified and found to be effective at increasing the availability and purchases of healthy food and decreasing purchases of unhealthy food. Most policies also had other components such as education, price reductions, and health interventions. The multiple gaps in research identified by this review suggest that additional research and ongoing evaluation of food procurement programs is required. Implementation of healthy food procurement policies in schools, worksites, hospitals, care homes, correctional facilities, government institutions, and remote communities increase markers of healthy eating. Prior or simultaneous implementation of ancillary education about healthy eating, and rationale for the policy may be critical success factors and additional research is needed. PMID:24595213

  17. Woodfuel procurement strategies of district heating plants

    International Nuclear Information System (INIS)

    Roos, A.; Bohlin, F.; Hektor, B.; Hillring, B.

    2003-01-01

    Woodfuel use in the Swedish district heating sector increased significantly from 1985 to 1999. This study analysed strategies and considerations concerning woodfuel procurement in district heating plants. Priorities and concerns in the industry involved an increased woodfuel share, ambitions to create an environmental image, cost minimisation, awareness about the role of energy policies for fuel choice, improvement of woodfuel quality and the ambition to maintain a competitive woodfuel market with several suppliers. Factor analysis yielded five dimensions in the woodfuel procurement strategies among the district heating companies: (1) increased woodfuel use; (2) import; (3) spot market woodfuel purchases; (4) focus on refined woodfuels; and (5) using price only when deciding whether to use woodfuels or other fuels. Five clusters were defined along the three strategy dimensions (1)-(3). The clusters differed concerning size, experiences from the introduction of woodfuels, perceptions about woodfuels and strategies employed to date. This paper describes different strategies that the district heating companies apply on the woodfuel market. The conclusion is that policies should consider this diversity in procurement strategies, mitigate their negative side-effects and assist to make them cost-effective. (author)

  18. Lithium niobate packaging challenges

    International Nuclear Information System (INIS)

    Murphy, E.J.; Holmes, R.J.; Jander, R.B.; Schelling, A.W.

    1988-01-01

    The use of lithium niobate integrated optic devices outside of the research laboratory is predicated on the development of a sound packaging method. The authors present a discussion of the many issues that face the development of a viable, robust packaging technology. The authors emphasize the interaction of lithium niobate's physical properties with available packaging materials and technologies. The broad range of properties (i.e. electro-optic, piezo-electric, pyro-electric, photorefractive...) that make lithium niobate an interesting material in many device applications also make it a packaging challenge. The package design, materials and packaging technologies must isolate the device from the environment so that lithium niobate's properties do not adversely affect the device performance

  19. Packaged die heater

    Science.gov (United States)

    Spielberger, Richard; Ohme, Bruce Walker; Jensen, Ronald J.

    2011-06-21

    A heater for heating packaged die for burn-in and heat testing is described. The heater may be a ceramic-type heater with a metal filament. The heater may be incorporated into the integrated circuit package as an additional ceramic layer of the package, or may be an external heater placed in contact with the package to heat the die. Many different types of integrated circuit packages may be accommodated. The method provides increased energy efficiency for heating the die while reducing temperature stresses on testing equipment. The method allows the use of multiple heaters to heat die to different temperatures. Faulty die may be heated to weaken die attach material to facilitate removal of the die. The heater filament or a separate temperature thermistor located in the package may be used to accurately measure die temperature.

  20. Packaging for Sustainability

    CERN Document Server

    Lewis, Helen; Fitzpatrick, Leanne

    2012-01-01

    The packaging industry is under pressure from regulators, customers and other stakeholders to improve packaging’s sustainability by reducing its environmental and societal impacts. This is a considerable challenge because of the complex interactions between products and their packaging, and the many roles that packaging plays in the supply chain. Packaging for Sustainability is a concise and readable handbook for practitioners who are trying to implement sustainability strategies for packaging. Industry case studies are used throughout the book to illustrate possible applications and scenarios. Packaging for Sustainability draws on the expertise of researchers and industry practitioners to provide information on business benefits, environmental issues and priorities, environmental evaluation tools, design for environment, marketing strategies, and challenges for the future.

  1. The Informing Needs of Procurement Officers in Israel

    Directory of Open Access Journals (Sweden)

    Yahel Giat

    2017-06-01

    Full Text Available Aim/Purpose: To develop and introduce a questionnaire that investigates the informing needs, information-seeking behavior, and supplier selection of procurement officers in Israel. The questionnaire’s internal consistency reliability is given. Additionally, we describe the demographic description of the procurement officers in Israel. Background: Procurement science is an important field that affects firms’ profits in the private sector and is significant to growth, innovation, sustainability, and welfare in the public sector. There is little research about the informing needs of procurement officers in general and particularly in Israel. Methodology: A quantitative questionnaire that is sent to all the procurement officers in Israel’s procuring association. Contribution: The questionnaire that is developed in this paper may be used by other researchers and practitioners to evaluate the information needs of procurement officers. Findings: The typical procurement officer is male, with a bachelor degree and is digitally proficient. Recommendations for Practitioners: The procuring side can use the questionnaire to develop better tools for obtaining information efficiently. The supplying side can use this knowledge to improve its exposure to potential customers and address its customer’s needs better. Recommendation for Researchers: The questionnaire can address theoretical questions such as how digital literacy affects the procuring process and provide empirical findings about active research areas such as supplier selection and information-seeking behavior. Future Research: Future research will examine the relationship between the various variables and demographic features to understand why specific information needs and information-seeking behaviors arise.

  2. Active and intelligent food packaging: legal aspects and safety concerns

    NARCIS (Netherlands)

    Dainelli, D.; Gontard, N.; Spyropoulos, D.; Zondervan-van den Beuken, E.; Tobback, P.

    2008-01-01

    'Active and intelligent' (A&I) food packaging is based on a deliberate interaction of the packaging with the food and/or its direct environment. This article presents: (i) the main types of materials developed for food contact; (ii) the global market and the future trends of active and intelligent

  3. MARS software package status

    International Nuclear Information System (INIS)

    Azhgirej, I.L.; Talanov, V.V.

    2000-01-01

    The MARS software package is intended for simulating the nuclear-electromagnetic cascades and the secondary neutrons and muons transport in the heterogeneous medium of arbitrary complexity in the magnetic fields presence. The inclusive approach to describing the particle production in the nuclear and electromagnetic interactions and by the unstable particles decay is realized in the package. The MARS software package was actively applied for solving various radiation physical problems [ru

  4. User friendly packaging

    DEFF Research Database (Denmark)

    Geert Jensen, Birgitte

    2010-01-01

    Most consumers have experienced occasional problems with opening packaging. Tomato sauce from the tinned mackerel splattered all over the kitchen counter, the unrelenting pickle jar lid, and the package of sliced ham that cannot be opened without a knife or a pair of scissors. The research project...... “User-friendly Packaging” aims to create a platform for developing more user-friendly packaging. One intended outcome of the project is a guideline that industry can use in development efforts. The project also points the way for more extended collaboration between companies and design researchers. How...... can design research help industry in packaging innovation?...

  5. The ZOOM minimization package

    International Nuclear Information System (INIS)

    Fischler, Mark S.; Sachs, D.

    2004-01-01

    A new object-oriented Minimization package is available for distribution in the same manner as CLHEP. This package, designed for use in HEP applications, has all the capabilities of Minuit, but is a re-write from scratch, adhering to modern C++ design principles. A primary goal of this package is extensibility in several directions, so that its capabilities can be kept fresh with as little maintenance effort as possible. This package is distinguished by the priority that was assigned to C++ design issues, and the focus on producing an extensible system that will resist becoming obsolete

  6. Plasma physics plotting package

    International Nuclear Information System (INIS)

    Hyman, D.H.

    1981-02-01

    We describe a package of plotting routines that do up to six two- or three-dimensional plots on a frame with minimal loss of resolution. The package now runs on a PDP-10 with PLOT-10 TCS primitives and on a Control Data Corporation-7600 and a Cray-1 with TV80LIB primitives on the National Magnetic Fusion Energy Computer Center network. The package is portable to other graphics systems because only the primitive plot calls are used from the underlying system's graphics package

  7. Active food packaging technologies.

    Science.gov (United States)

    Ozdemir, Murat; Floros, John D

    2004-01-01

    Active packaging technologies offer new opportunities for the food industry, in the preservation of foods. Important active packaging systems currently known to date, including oxygen scavengers, carbon dioxide emitters/absorbers, moisture absorbers, ethylene absorbers, ethanol emitters, flavor releasing/absorbing systems, time-temperature indicators, and antimicrobial containing films, are reviewed. The principle of operation of each active system is briefly explained. Recent technological advances in active packaging are discussed, and food related applications are presented. The effects of active packaging systems on food quality and safety are cited.

  8. 2016 Status Report on Major Equipment Procurement

    Directory of Open Access Journals (Sweden)

    David Perry

    2017-09-01

    Full Text Available The Department of National Defence made some progress in procurement in 2016 despite obstacles that included a continued drop in spending, the advent of a new federal Liberal government and uncertainty over the outcome of the Defence Policy Review. Four trends affected defence acquisitions in 2016. These include an ongoing slippage in recapitalizing the Canadian Armed Forces, some encouraging moves made on the shipbuilding and fighter jet files, mixed progress on implementing the 2014 Defence Procurement Strategy, and uncertainty over the Defence Policy Review. It is also too early to tell how the Trudeau government’s Policy on Results, known as the “deliverology” approach, will play out for defence procurement. However, Budget 2016’s major focus was not on defence, and it shifted some funding for capital equipment to a new endpoint of 2045. This suggests that delay in the overall defence procurement program continues. While the Liberals kept their pledge to make investment in the Royal Canadian Navy a priority, they also made good last year on a negative promise – not to purchase the F-35 stealth fighter bomber. However, further slowing things is the Liberals’ refusal to launch a competition to replace it until the Defence Policy Review is published. The government has made this situation more fraught with its intention to buy 18 Boeing Super Hornet fighter jets as interim aircraft, since Liberal policy requires the Royal Canadian Air Force to be capable of meeting both NORAD’s and NATO’s operational needs simultaneously. Prior to the release of the new defence policy, both the interim and permanent fighter aircraft projects lacked adequate funding. They were among several large projects that have been approved, but have not yet moved to the contract stage, and whose budgets were inadequate to move forward. Adding to this mix is the fact that a government-wide effort initiated in 2014 to streamline the defence procurement

  9. Safety Analysis Report for Packaging, Y-12 National Security Complex, Model ES-3100 Package with Bulk HEU Contents

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, James [Y-12 National Security Complex, Oak Ridge, TN (United States); Goins, Monty [Y-12 National Security Complex, Oak Ridge, TN (United States); Paul, Pran [Y-12 National Security Complex, Oak Ridge, TN (United States); Wilkinson, Alan [Y-12 National Security Complex, Oak Ridge, TN (United States); Wilson, David [Y-12 National Security Complex, Oak Ridge, TN (United States)

    2015-09-03

    This safety analysis report for packaging (SARP) presents the results of the safety analysis prepared in support of the Consolidated Nuclear Security, LLC (CNS) request for licensing of the Model ES-3100 package with bulk highly enriched uranium (HEU) contents and issuance of a Type B(U) Fissile Material Certificate of Compliance. This SARP, published in the format specified in the Nuclear Regulatory Commission (NRC) Regulatory Guide 7.9 and using information provided in UCID-21218 and NRC Regulatory Guide 7.10, demonstrates that the Y-12 National Security Complex (Y-12) ES-3100 package with bulk HEU contents meets the established NRC regulations for packaging, preparation for shipment, and transportation of radioactive materials given in Title 10, Part 71, of the Code of Federal Regulations (CFR) [10 CFR 71] as well as U.S. Department of Transportation (DOT) regulations for packaging and shipment of hazardous materials given in Title 49 CFR. To protect the health and safety of the public, shipments of adioactive materials are made in packaging that is designed, fabricated, assembled, tested, procured, used, maintained, and repaired in accordance with the provisions cited above. Safety requirements addressed by the regulations that must be met when transporting radioactive materials are containment of radioactive materials, radiation shielding, and assurance of nuclear subcriticality.

  10. ANALYSIS OF THE FOREIGN GOVERNMENT AND CORPORATE PROCUREMENT MANAGEMENT EXPERIENCE

    Directory of Open Access Journals (Sweden)

    Vladimir Vladimirovich Savchenko

    2016-01-01

    Full Text Available This article presents a synthesis of the experience of foreign government and corporate procurement management. Set out key aspects of the organization of procurement for government and corporate needs, disclosed issues of centralization and decentralization of procurement, as well as given clarifi cation of the concept of "procurement management system" and structured the main elements that make up this system. The purpose / goal. The purpose of the work is to study the nature and characteristics of the functioning of government and corporate experience in procurement management, identifying problems and prospects of its development. Methodology. To perform this work were used legal, comparative and statistical analysis methods. Results. As part of the presentation of the present article the author has examined the nature, objectives and stages of public and corporate procurement management.

  11. Public Procurement and the Development of the Swedish Telecommunications Market

    OpenAIRE

    Lindskog, Helena

    2008-01-01

    This thesis describes and analyses public procurement and its processes in general against the framework of industrial marketing and purchasing. In particular, it focuses on the public procurement of telecommunications (“telecom”) and its effects on the de-monopolization and development of the Swedish telecom market based on empirical material from three case studies, interviews and publicly available written sources. Public procurement is a significant part of any country’s economy. There is...

  12. Routines and Communities of Practice in Public Environmental Procurement Processes

    OpenAIRE

    Larsen, Katarina; Svane, Örjan

    2005-01-01

    Environmental procurement has received increasing attention as a policy tool promoting change towards sustainable consumption and production. The successful implementation of public environmental procurement policy requires the establishment of new routines for user-producer-supplier relationships that enable the integration of environmental aspects. The aim of the study is to analyse the roles of different communities of practice and learning patterns in environmental procurement processes. ...

  13. Improving the effectiveness of public entities procurement practices

    OpenAIRE

    2013-01-01

    M. Com. (Business Management) The media and the Auditor General have extensively reported on the ineffective and unethical conduct of public sector employees regarding the procurement of goods and services. The Auditor General’s report demonstrates that there is evidence that public sector procurement processes are less than adequate to achieve constitutional procurement goals, which are to conduct processes that are fair, equitable, transparent, competitive and cost-effective The delivery...

  14. Considerations regarding procurement activities in institutions of local authority

    OpenAIRE

    Mãdãlina ALBU

    2013-01-01

    Objectives which they propose a public authority requires, among others, providing the necessary resources, including the material occupy a large proportion. This is done through the public procurement system. The procurement is part of the legal and economic reality of the Romanian society and covers all rules and actions on public spending and the application launched by public bodies meets the proposed offer of an operator. This paper presents an analysis of the public procurement system i...

  15. Sustainable Public Procurement : a new policy paradigm in France ?

    OpenAIRE

    Le Velly, Ronan

    2010-01-01

    The purpose of this paper is to explore the “new paradigm” of sustainable public procurement in France, that is, its cognitive and normative frameworks. Firstly, the author shows that the newness of this paradigm has to do with the identification of sustainable procurement as a stake in its own right. Next, he shows that the good practices associated with sustainable procurement are also new (close relationships with suppliers, systematic thought about what is needed, innovative methods of co...

  16. Opportunities for public procurement procedures efficiency and optimization improvement

    OpenAIRE

    Junevičius, Algis; Ereminaitė, Simona

    2010-01-01

    Public procurement is one of the most actual problems of economics and a potential instrument of successful public policy, which can control money flows and manipulate the appearance of corruption opportunities. Procurement practices are relatively new in the public sector, but everyone knows the complicated regulation and coordination of this process. Despite the fact that society often discus about public procurement problems, the regulation of this process requires an in-depth evaluation b...

  17. CYPROS - Cybernetic Program Packages

    Directory of Open Access Journals (Sweden)

    Arne Tyssø

    1980-10-01

    Full Text Available CYPROS is an interactive program system consisting of a number of special purpose packages for simulation, identification, parameter estimation and control system design. The programming language is standard FORTRAN IV and the system is implemented on a medium size computer system (Nord-10. The system is interactive and program control is obtained by the use of numeric terminals. Output is rapidly examined by extensive use of video colour graphics. The subroutines included in the packages are designed and documented according to standardization rules given by the SCL (Scandinavian Control Library organization. This simplifies the exchange of subroutines throughout the SCL system. Also, this makes the packages attractive for implementation by industrial users. In the simulation package, different integration methods are available and it can be easily used for off-line, as well as real time, simulation problems. The identification package consists of programs for single-input/single-output and multivariablc problems. Both transfer function models and state space models can be handled. Optimal test signals can be designed. The control package consists of programs based on multivariable time domain and frequency domain methods for analysis and design. In addition, there is a package for matrix and time series manipulation. CYPROS has been applied successfully to industrial problems of various kinds, and parts of the system have already been implemented on different computers in industry. This paper will, in some detail, describe the use and the contents of the packages and some examples of application will be discussed.

  18. User friendly packaging

    DEFF Research Database (Denmark)

    Geert Jensen, Birgitte

    2010-01-01

    Most consumers have experienced occasional problems with opening packaging. Tomato sauce from the tinned mackerel splattered all over the kitchen counter, the unrelenting pickle jar lid, and the package of sliced ham that cannot be opened without a knife or a pair of scissors. The research project...

  19. NRF TRIGA packaging

    International Nuclear Information System (INIS)

    Clements, M.D.

    1995-11-01

    Training Reactor Isotopes, General Atomics (TRIGA reg-sign) Reactors are in use at four US Department of Energy (DOE) complex facilities and at least 23 university, commercial, or government facilities. The development of the Neutron Radiography Facility (NRF) TRIGA packaging system began in October 1993. The Hanford Site NRF is being shut down and requires an operationally user-friendly transportation and storage packaging system for removal of the TRIGA fuel elements. The NRF TRIGA packaging system is designed to remotely remove the fuel from the reactor and transport the fuel to interim storage (up to 50 years) on the Hanford Site. The packaging system consists of a cask and an overpack. The overpack is used only for transport and is not necessary for storage. Based upon the cask's small size and light weight, small TRIGA reactors will find it versatile for numerous refueling and fuel storage needs. The NRF TRIGA packaging design also provides the basis for developing a certifiable and economical packaging system for other TRIGA reactor facilities. The small size of the NRF TRIGA cask also accommodates placing the cask into a larger certified packaging for offsite transport. The Westinghouse Hanford Company NRF TRIGA packaging, as described herein can serve other DOE sites for their onsite use, and the design can be adapted to serve university reactor facilities, handling a variety of fuel payloads

  20. WASTE PACKAGE TRANSPORTER DESIGN

    International Nuclear Information System (INIS)

    Weddle, D.C.; Novotny, R.; Cron, J.

    1998-01-01

    The purpose of this Design Analysis is to develop preliminary design of the waste package transporter used for waste package (WP) transport and related functions in the subsurface repository. This analysis refines the conceptual design that was started in Phase I of the Viability Assessment. This analysis supports the development of a reliable emplacement concept and a retrieval concept for license application design. The scope of this analysis includes the following activities: (1) Assess features of the transporter design and evaluate alternative design solutions for mechanical components. (2) Develop mechanical equipment details for the transporter. (3) Prepare a preliminary structural evaluation for the transporter. (4) Identify and recommend the equipment design for waste package transport and related functions. (5) Investigate transport equipment interface tolerances. This analysis supports the development of the waste package transporter for the transport, emplacement, and retrieval of packaged radioactive waste forms in the subsurface repository. Once the waste containers are closed and accepted, the packaged radioactive waste forms are termed waste packages (WP). This terminology was finalized as this analysis neared completion; therefore, the term disposal container is used in several references (i.e., the System Description Document (SDD)) (Ref. 5.6). In this analysis and the applicable reference documents, the term ''disposal container'' is synonymous with ''waste package''

  1. WASTE PACKAGE TRANSPORTER DESIGN

    Energy Technology Data Exchange (ETDEWEB)

    D.C. Weddle; R. Novotny; J. Cron

    1998-09-23

    The purpose of this Design Analysis is to develop preliminary design of the waste package transporter used for waste package (WP) transport and related functions in the subsurface repository. This analysis refines the conceptual design that was started in Phase I of the Viability Assessment. This analysis supports the development of a reliable emplacement concept and a retrieval concept for license application design. The scope of this analysis includes the following activities: (1) Assess features of the transporter design and evaluate alternative design solutions for mechanical components. (2) Develop mechanical equipment details for the transporter. (3) Prepare a preliminary structural evaluation for the transporter. (4) Identify and recommend the equipment design for waste package transport and related functions. (5) Investigate transport equipment interface tolerances. This analysis supports the development of the waste package transporter for the transport, emplacement, and retrieval of packaged radioactive waste forms in the subsurface repository. Once the waste containers are closed and accepted, the packaged radioactive waste forms are termed waste packages (WP). This terminology was finalized as this analysis neared completion; therefore, the term disposal container is used in several references (i.e., the System Description Document (SDD)) (Ref. 5.6). In this analysis and the applicable reference documents, the term ''disposal container'' is synonymous with ''waste package''.

  2. The BINSYN Program Package

    Directory of Open Access Journals (Sweden)

    Albert P. Linnell

    2012-06-01

    Full Text Available The BINSYN program package, recently expanded to calculate synthetic spectra of cataclysmic variables, is being further extended to include synthetic photometry of ordinary binary stars in addition to binary stars with optically thick accretion disks. The package includes a capability for differentials correction optimization of eclipsing binary systems using synthetic photometry.

  3. The LCDROOT Analysis Package

    International Nuclear Information System (INIS)

    Abe, Toshinori

    2001-01-01

    The North American Linear Collider Detector group has developed simulation and analysis program packages. LCDROOT is one of the packages, and is based on ROOT and the C++ programing language to maximally benefit from object oriented programming techniques. LCDROOT is constantly improved and now has a new topological vertex finder, ZVTOP3. In this proceeding, the features of the LCDROOT simulation are briefly described

  4. Grooming. Learning Activity Package.

    Science.gov (United States)

    Stark, Pamela

    This learning activity package on grooming for health workers is one of a series of 12 titles developed for use in health occupations education programs. Materials in the package include objectives, a list of materials needed, information sheets, reviews (self evaluations) of portions of the content, and answers to reviews. These topics are…

  5. Waste package performance analysis

    International Nuclear Information System (INIS)

    Lester, D.H.; Stula, R.T.; Kirstein, B.E.

    1982-01-01

    A performance assessment model for multiple barrier packages containing unreprocessed spent fuel has been applied to several package designs. The resulting preliminary assessments were intended for use in making decisions about package development programs. A computer model called BARIER estimates the package life and subsequent rate of release of selected nuclides. The model accounts for temperature, pressure (and resulting stresses), bulk and localized corrosion, and nuclide retardation by the backfill after water intrusion into the waste form. The assessment model assumes a post-closure, flooded, geologic repository. Calculations indicated that, within the bounds of model assumptions, packages could last for several hundred years. Intact backfills of appropriate design may be capable of nuclide release delay times on the order of 10 7 yr for uranium, plutonium, and americium. 8 references, 6 figures, 9 tables

  6. RH Packaging Operations Manual

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2003-01-01

    This procedure provides operating instructions for the RH-TRU 72-B Road Cask, Waste Shipping Package. In this document, ''Packaging'' refers to the assembly of components necessary to ensure compliance with the packaging requirements (not loaded with a payload). ''Package'' refers to a Type B packaging that, with its radioactive contents, is designed to retain the integrity of its containment and shielding when subject to the normal conditions of transport and hypothetical accident test conditions set forth in 10 CFR Part 71. Loading of the RH 72-B cask can be done two ways, on the RH cask trailer in the vertical position or by removing the cask from the trailer and loading it in a facility designed for remote-handling (RH). Before loading the 72-B cask, loading procedures and changes to the loading procedures for the 72-B cask must be sent to CBFO at sitedocuments at wipp.ws for approval

  7. Advanced flip chip packaging

    CERN Document Server

    Lai, Yi-Shao; Wong, CP

    2013-01-01

    Advanced Flip Chip Packaging presents past, present and future advances and trends in areas such as substrate technology, material development, and assembly processes. Flip chip packaging is now in widespread use in computing, communications, consumer and automotive electronics, and the demand for flip chip technology is continuing to grow in order to meet the need for products that offer better performance, are smaller, and are environmentally sustainable. This book also: Offers broad-ranging chapters with a focus on IC-package-system integration Provides viewpoints from leading industry executives and experts Details state-of-the-art achievements in process technologies and scientific research Presents a clear development history and touches on trends in the industry while also discussing up-to-date technology information Advanced Flip Chip Packaging is an ideal book for engineers, researchers, and graduate students interested in the field of flip chip packaging.

  8. Economic risks of the system of state and municipal procurement

    Directory of Open Access Journals (Sweden)

    Belokrylova Olga, S.

    2015-12-01

    Full Text Available In the paper the audit of economic risks at all stages of procurement for state and municipal needs from both customers and bidders is carried out on the basis of the implementation of the integrated approach . Stages in the procurement under a single contract system, which is characterized by the high economic risks are planning, supplier selection, conclusion and execution of the contract. A number of the measures according to the localization of economic risks are offered, in particular the implementation of compliance programs, which institutionalize the compliance by the organization, anti-corruption legislation; increasing qualification of specialists in public procurement and increased control through centralization of procurement.

  9. Challenges of public procurement in EU funded projects

    Directory of Open Access Journals (Sweden)

    Marko Šostar

    2017-01-01

    Full Text Available Membership in the European Union implies adjustment of EU projects to the rules of Structural Funds, but also adoption of legal regulations, thus influencing the process of implementation of the public procurement in EU funded projects. Each successful applicant who expressed the need for procurement of goods, services and works of a certain value, must respect the principles of public procurement. Irregularities in the procurement process can lead to the failure of returning the EU funds even several years after the end of the project. Therefore, the knowledge and proper implementation of public procurement is the main precondition for the correct implementation of each project. In order to obtain information about the current absorption capacity of the public procurement liable parties, and to identify key obstacles that stakeholders face in procurement procedures, the research was conducted by surveying 30 entities that are subject of public procurement in Croatia. Research results imply the poor quality of public procurement in the implemented projects, which often results in financial corrections, disapproving project reports, etc.

  10. Critical factors for sustainable food procurement in zoological collections.

    Science.gov (United States)

    Hanson, Jonathan H

    2015-01-01

    Food procurement can play an important role in sustainable food supply chain management by zoos, linking organizational operations to the biodiversity conservation and sustainability mission of zoological collections. This study therefore examines the critical factors that shape sustainable food procurement in zoo and aquariums. Using a web-based survey data was collected from 41 members of the British and Irish Association of Zoos and Aquariums (BIAZA). This included information on the sustainable food procurement practices of these institutions for both their human and animal food supply chains, as well as profile information and data on the factors contributing to and inhibiting sustainable procurement practices. Zoological collections operated by charities, and those with a certified sustainability standard, were found to have significantly higher levels of sustainable food procurement. Zoos and aquariums whose human food operations were not contracted to an external party were also found to have significantly higher levels of sustainable food procurement in their human food supply chain. The most important drivers of sustainable food procurement were cost savings, adequate financial support and improved product quality. The highest ranking barriers were higher costs, other issues taking priority and a lack of alternative suppliers. The results suggest that a number of critical factors shape sustainable food procurement in zoological collections in the British Isles. Financial factors, such as cost savings, were important considerations. The significance of mission-related factors, such as charity status, indicated that core values held by zoos and aquariums can also influence their food procurement practices. © 2015 Wiley Periodicals, Inc.

  11. THE EFFECTIVENESS OF BUDGET ALLOCATION IN PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    Irina Yu. Fedorova

    2015-01-01

    Full Text Available This article deals with the problem of budget allocation in the state order inRussia. Assesses the effectiveness of the financial mechanism of the public procurement business entities, purchasing activities are regulated by Federal Law №44-FZ and №223-FZ. The dynamics of financing the procurement process and reveal its features by using the most common methods of procurement through competitive bidding and without bidding. Identifies the causes of inefficient spending budget as a result of the non-competitive procurement methods by certain categories of business entities. 

  12. Playing the game of public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    Given the emergence and diffusion of policies aiming at promoting the utilisation of public procurement as an innovation policy instrument, it is remarkable that very little scholarly attention has been given to the teaching of public procurement of innovation. This paper sets out to contribute...... towards mending this gap, by discussing some considerations made in the context of the development and set up of a university course in public procurement of innovation. A major challenge for such an endeavour is how to bring the complexities of real-life public procurement into a university class...

  13. E-Procurement and the U.S. Military

    National Research Council Canada - National Science Library

    Doe, David

    2002-01-01

    .... Meanwhile, companies worldwide are undergoing transformation as they harness the power of Internet-enabled tools, One significant aspect of industry's transformation is electronic or e-procurement...

  14. 75 FR 1355 - Procurement List Additions and Deletions

    Science.gov (United States)

    2010-01-11

    .../Location: Janitorial Services, Jamestown Service Center, 8430 Country Club Street, Jamestown, ND. NPA..., the following products and services are deleted from the Procurement List: Products Business Cards NSN...

  15. EQ6 Calculations for Chemical Degradation of Navy Waste Packages

    International Nuclear Information System (INIS)

    S. LeStrange

    1999-01-01

    The Monitored Geologic Repository Waste Package Operations of the Civilian Radioactive Waste Management System Management and Operating Contractor (CRWMS M and O) performed calculations to provide input for disposal of spent nuclear fuel (SNF) from the Navy (Refs. 1 and 2). The Navy SNF has been considered for disposal at the potential Yucca Mountain site. For some waste packages, the containment may breach (Ref. 3), allowing the influx of water. Water in the waste package may moderate neutrons, increasing the likelihood of a criticality event within the waste package. The water may gradually leach the fissile components and neutron absorbers out of the waste package. In addition, the accumulation of silica (SiO 2 ) in the waste package over time may further affect the neutronics of the system. This study presents calculations of the long-term geochemical behavior of waste packages containing the Enhanced Design Alternative (EDA) II inner shell, Navy canister, and basket components. The calculations do not include the Navy SNF in the waste package. The specific study objectives were to determine the chemical composition of the water and the quantity of silicon (Si) and other solid corrosion products in the waste package during the first million years after the waste package is breached. The results of this calculation will be used to ensure that the type and amount of criticality control material used in the waste package design will prevent criticality

  16. EQ6 Calculations for Chemical Degradation of Navy Waste Packages

    Energy Technology Data Exchange (ETDEWEB)

    S. LeStrange

    1999-11-15

    The Monitored Geologic Repository Waste Package Operations of the Civilian Radioactive Waste Management System Management & Operating Contractor (CRWMS M&O) performed calculations to provide input for disposal of spent nuclear fuel (SNF) from the Navy (Refs. 1 and 2). The Navy SNF has been considered for disposal at the potential Yucca Mountain site. For some waste packages, the containment may breach (Ref. 3), allowing the influx of water. Water in the waste package may moderate neutrons, increasing the likelihood of a criticality event within the waste package. The water may gradually leach the fissile components and neutron absorbers out of the waste package. In addition, the accumulation of silica (SiO{sub 2}) in the waste package over time may further affect the neutronics of the system. This study presents calculations of the long-term geochemical behavior of waste packages containing the Enhanced Design Alternative (EDA) II inner shell, Navy canister, and basket components. The calculations do not include the Navy SNF in the waste package. The specific study objectives were to determine the chemical composition of the water and the quantity of silicon (Si) and other solid corrosion products in the waste package during the first million years after the waste package is breached. The results of this calculation will be used to ensure that the type and amount of criticality control material used in the waste package design will prevent criticality.

  17. A Procurement Performance Model for Construction Frameworks

    Directory of Open Access Journals (Sweden)

    Terence Y M Lam

    2015-07-01

    Full Text Available Collaborative construction frameworks have been developed in the United Kingdom (UK to create longer term relationships between clients and suppliers in order to improve project outcomes. Research undertaken into highways maintenance set within a major county council has confirmed that such collaborative procurement methods can improve time, cost and quality of construction projects. Building upon this and examining the same single case, this research aims to develop a performance model through identification of performance drivers in the whole project delivery process including pre and post contract phases. A priori performance model based on operational and sociological constructs was proposed and then checked by a pilot study. Factor analysis and central tendency statistics from the questionnaires as well as content analysis from the interview transcripts were conducted. It was confirmed that long term relationships, financial and non-financial incentives and stronger communication are the sociological behaviour factors driving performance. The interviews also established that key performance indicators (KPIs can be used as an operational measure to improve performance. With the posteriori performance model, client project managers can effectively collaboratively manage contractor performance through procurement measures including use of longer term and KPIs for the contract so that the expected project outcomes can be achieved. The findings also make significant contribution to construction framework procurement theory by identifying the interrelated sociological and operational performance drivers. This study is set predominantly in the field of highways civil engineering. It is suggested that building based projects or other projects that share characteristics are grouped together and used for further research of the phenomena discovered.

  18. Postmortem sperm procurement: a legal perspective.

    Science.gov (United States)

    Kahan, S E; Seftel, A D; Resnick, M I

    1999-06-01

    Postmortem sperm procurement with subsequent artificial insemination has become a technically feasible method for posthumous conception. A variety of legal questions exist involving the rights and relationships of the deceased, his family and his issue. We addressed these questions and designed a workable protocol for postmortem sperm procurement. MEDLINE, WESTLAW and LEXIS medical literature, and case law searches were conducted. United States and international case law, United States (federal and state) statutes, Uniform Law Commissions Acts, and law review commentaries and articles were reviewed. While postmortem sperm procurement is being requested throughout the United States, no standard protocol or procedural guidelines have been established by federal or state statute. Furthermore, the courts have not yet addressed this specific scenario in reported case law. Statutes and case law do address related factual scenarios and issues, including property rights in human bodies, rules governing transplantation of human organs/body parts, rights of parties in in vivo sperm bank donations and responsibilities of parents to the conceptus of artificial insemination. A workable protocol can be established by analyzing case law and statutes addressing factually similar scenarios. Urologists must focus on the express intent of the decedent and limit any postmortem sperm retrieval to the specific requests made by the decedent. Decedent requests should be documented in writing. The decedent must be competent and of majority age. In the absence of decedent expressed affirmative directive calling for sperm retrieval, no other relative or guardian may authorize this retrieval. Issues regarding the legitimacy and inheritance rights of the conceptus will most consistently be addressed when explicitly provided for in the will of the decedent.

  19. Reliability of industrial packaging for microsystems

    DEFF Research Database (Denmark)

    Reus, Roger De; Christensen, Carsten; Weichel, Steen

    1998-01-01

    . Protective coatings of amorphous silicon carbide and tantalum oxide are suitable candidates with etch rates below 0.1 Angstrom/h in aqueous solutions with pH II at temperatures up to 140 degrees C. Si-Ta-N films exhibit etch rates around 1 Angstrom/h. Parylene C coatings did not etch but peeled off after......Packaging concepts for silicon-based micromachined sensors exposed to harsh environments are explored. By exposing the sensors directly to the media and applying protection at the wafer level the packaging and assembly will be simplified as compared to conventional methods of fabrication...

  20. EXAMINATION OF ETHICAL PROCUREMENT THROUGH ENTERPRISE EXAMPLES

    Directory of Open Access Journals (Sweden)

    Beáta Sz. G. Pató

    2016-06-01

    Full Text Available Today’s business world is affected by the 21st century’s processes, like globalization, fluent online attendance, digitalization and their direct consequence depersonalisation. The authors are motivated by these facts and want to vivify the „old fashioned” correct business models and find the indispensable parameter of the well-functioning economy, in one word today’s equivalent of „honorable gentlemen”. The assumed key to success could be useful for the for-profit sector because not only profit can be the impelling in the professional life of a corporation. The human value added is one of the most important keystones of thrift. The aim to establish a balance between economic and ethical behaviour of corporations has been enounced serving the interest of all participants, consumers, corporations and society. The before natural thought values seem nowadays to turn into something different or to be neglected. As a consequence the question has been raised, if society has the force to establish and improve Ethics, will it be able to destroy it as well?! The main focus of the research is therefore the mapping of criteria and marks which belong to on the competitive market successful enterprises whose procurement decisions are ethical as well. These marks can be formal or informal. The results of the research show well that there are parameters of a company, for example, a code of conduct within guidelines concerning the procurement or procedure manuals in which also ethical issues appear in a formal way. From another point of view there are informal signs like customs arising from the corporate culture, daily routine or just human behaviour and convincement of the management and procurement employees that also support the ethical performance of the company. The results of the research can serve as best practice for the other enterprises too in their daily appearance on the market. Particularly in that area the company’s most important

  1. The New EU Public Procurement Directives

    DEFF Research Database (Denmark)

    , transparency requirements, competitive dialogue, framework agreements, use of social and environmental criteria, Partnering and Public Private Partnerships and concessions. This book contains contributions based on presentations given by a number of the international and Danish speakers at the conference.......31 March 2004 the EU adopted two new public procurement directives: one for the public sector (2004/18/EC) and one for utilities (2004/17/EC). The new directives aim at simplification and modernisation of the previously existing directives including adaptation to electronic purchasing techniques...

  2. Debating Organ Procurement Policy Without Illusions.

    Science.gov (United States)

    Hippen, Benjamin

    2015-10-01

    In this perspective, I review and critique claims that the transplant waiting list overstates the demand for kidneys and correct a few mischaracterizations of some structural barriers to increasing rates of transplantation. The solutions to the shortage of organs proffered by opponents of financial incentives fail to account for a panoply of clinical, regulatory, and financial realities of transplantation centers in the United States in ways that undermine the thesis that a trial of financial incentives for organ procurement is not warranted at this time. I conclude with some personal pessimistic reflections on the progress of this debate. Copyright © 2015 National Kidney Foundation, Inc. Published by Elsevier Inc. All rights reserved.

  3. Stopping Illicit Procurement: Lessons from Global Finance

    Energy Technology Data Exchange (ETDEWEB)

    Hund, Gretchen; Kurzrok, Andrew J.

    2014-06-19

    Government regulators and the financial sector cooperate to combat money laundering and terrorist financing. This information-sharing relationship is built upon a strong legislative foundation and effective operational procedures. As with money-laundering and terrorist financing, halting the illicit procurement of dual-use commodities requires close coordination between government and industry. However, many of the legal and operational features present in financial threat cooperation do not exist in the export control realm. This article analyzes the applicability of financial industry cooperative measures to nonproliferation.

  4. Packaging Printing Today

    Directory of Open Access Journals (Sweden)

    Stanislav Bolanča

    2015-12-01

    Full Text Available Printing packaging covers today about 50% of all the printing products. Among the printing products there are printing on labels, printing on flexible packaging, printing on folding boxes, printing on the boxes of corrugated board, printing on glass packaging, synthetic and metal ones. The mentioned packaging are printed in flexo printing technique, offset printing technique, intaglio halftone process, silk – screen printing, ink ball printing, digital printing and hybrid printing process. The possibilities of particular printing techniques for optimal production of the determined packaging were studied in the paper. The problem was viewed from the technological and economical aspect. The possible printing quality and the time necessary for the printing realization were taken as key parameters. An important segment of the production and the way of life is alocation value and it had also found its place in this paper. The events in the field of packaging printing in the whole world were analyzed. The trends of technique developments and the printing technology for packaging printing in near future were also discussed.

  5. The World Bank Group and Public Procurement--An Independent Evaluation : Volume 2: Achieving Development Effectiveness through Procurement in Bank Financial Assistance

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  6. Consumer response to packaging design

    NARCIS (Netherlands)

    Steenis, Nigel D.; Herpen, van Erica; Lans, van der Ivo A.; Ligthart, Tom N.; Trijp, van Hans C.M.

    2017-01-01

    Building on theories of cue utilization, this paper investigates whether and how packaging sustainability influences consumer perceptions, inferences and attitudes towards packaged products. A framework is tested in an empirical study among 249 students using soup products varying in packaging

  7. Safety evaluation for packaging CPC metal boxes

    International Nuclear Information System (INIS)

    Romano, T.

    1995-01-01

    This Safety Evaluation for Packaging (SEP) provides authorization for the use of Container Products Corporation (CPC) metal boxes, as described in this document, for the interarea shipment of radioactive contaminated equipment and debris for storage in the Central Waste Complex (CWC) or T Plant located in the 200 West Area. Authorization is granted until November 30, 1995. The CPC boxes included in this SEP were originally procured as US Department of Transportation (DOT) Specification 7A Type A boxes. A review of the documentation provided by the manufacturer revealed the documentation did not adequately demonstrate compliance to the 4 ft drop test requirement of 49 CFR 173.465(c). Preparation of a SEP is necessary to document the equivalent safety of the onsite shipment in lieu of meeting DOT packaging requirements until adequate documentation is received. The equivalent safety of the shipment is based on the fact that the radioactive contents consist of contaminated equipment and debris which are not dispersible. Each piece is wrapped in two layers of no less than 4 mil plastic prior to being placed in the box which has an additional 10 mil liner. Pointed objects and sharp edges are padded to prevent puncture of the plastic liner and wrapping

  8. Packaging Concerns/Techniques for Large Devices

    Science.gov (United States)

    Sampson, Michael J.

    2009-01-01

    This slide presentation reviews packaging challenges and options for electronic parts. The presentation includes information about non-hermetic packages, space challenges for packaging and complex package variations.

  9. Hermeticity of electronic packages

    CERN Document Server

    Greenhouse, Hal; Romenesco, Bruce

    2011-01-01

    This is a book about the integrity of sealed packages to resist foreign gases and liquids penetrating the seal or an opening (crack) in the packageùespecially critical to the reliability and longevity of electronics. The author explains how to predict the reliability and the longevity of the packages based on leak rate measurements and the assumptions of impurities. Non-specialists in particular will benefit from the author's long involvement in the technology. Hermeticity is a subject that demands practical experience, and solving one problem does not necessarily give one the background to so

  10. Hermeticity of electronic packages

    CERN Document Server

    Greenhouse, Hal

    2000-01-01

    This is a book about the integrity of sealed packages to resist foreign gases and liquids penetrating the seal or an opening (crack) in the package-especially critical to the reliability and longevity of electronics. The author explains how to predict the reliability and the longevity of the packages based on leak rate measurements and the assumptions of impurities. Non-specialists in particular will benefit from the author's long involvement in the technology. Hermeticity is a subject that demands practical experience, and solving one problem does not necessarily give one the background to so

  11. Safety Analysis Report - Packages, 9965, 9968, 9972-9975 Packages

    International Nuclear Information System (INIS)

    Blanton, P.

    2000-01-01

    This Safety Analysis Report for Packaging (SARP) documents the analysis and testing performed on four type B Packages: the 9972, 9973, 9974, and 9975 packages. Because all four packages have similar designs with very similar performance characteristics, all of them are presented in a single SARP. The performance evaluation presented in this SARP documents the compliance of the 9975 package with the regulatory safety requirements. Evaluations of the 9972, 9973, and 9974 packages support that of the 9975. To avoid confusion arising from the inclusion of four packages in a single document, the text segregates the data for each package in such a way that the reader interested in only one package can progress from Chapter 1 through Chapter 9. The directory at the beginning of each chapter identifies each section that should be read for a given package. Sections marked ''all'' are generic to all packages

  12. US utility uranium procurement: goals and tactics

    International Nuclear Information System (INIS)

    Warner, Jim

    1991-01-01

    This paper summarizes and attempts to explain the results of a survey sent to 37 US utilities asking them two questions: What are the goals of your uranium procurement strategy? and what are the tactics you use in achieving those goals? The results are presented in a summary fashion to protect individual company proprietary information. This paper is directed particularly to non-US uranium market participants as an aid to gain further insight into ''the US market'' and to understand how the potential cumulative market responses of US utilities may influence their procurement plans. Out of 37 utilities surveyed, 25 responded. Some utilities were interviewed over the telephone. Some responses were as short as one paragraph, while others were 1 to 5 pages in length. The format was chosen to encourage original responses. The range of responses could be used in the future as a basis for a multiple-choice type survey to form a more statistically representative sample. The responses are summarized for each of the two questions. (author)

  13. The role of procurement in liabilities management

    International Nuclear Information System (INIS)

    Nicol, R.D.

    1998-01-01

    The new United Kingdom Atomic Energy Authority (UKAEA) has as its primary purpose the management of the liabilities left from the nuclear R and D programme. When it was set up in its present form in 1994 (as UKAEA Government Division) it had as its core functions programme management and procurement. It aimed to be involved in project implementation and operations only in so far as it needed to be for purposes of control as nuclear site licensee, or where otherwise this represented best value for money for the taxpayer. This paper describes how the clear definition and split of client and contractor roles has enabled UKAEA to promote the development of a competitive market in decommissioning, to the benefit of the taxpayer and industry. The importance of procurement at the various stages of planning and implementation are explained, along with some of the initiatives UKAEA has taken to improve client-contractor relationships. It is argued that UKAEA's approach has helped to define the boundaries of what is permissible in contractorization within the terms of a nuclear site licence. (author)

  14. Procurement and execution of PCB analyses: Customer-analyst interactions

    International Nuclear Information System (INIS)

    Erickson, M.D.

    1993-01-01

    The practical application of PCB (polychlorinated biphenyl) analyses begins with a request for the analysis and concludes with provision of the requested analysis. The key to successful execution of this iteration is timely, professional communication between the requester and the analyst. Often PCB analyses are not satisfactorily executed, either because the requester failed to give adequate instructions or because the analyst simply ''did what he/she was told.'' The request for and conduct of a PCB analysis represents a contract for the procurement of a product (information about the sample); if both parties recognize and abide by this contractual relationship, the process generally proceeds smoothly. Requesters may be corporate purchasing agents working from a scope of work, a sample management office, a field team leader, a project manager, a physician's office, or the analyst himself. The analyst with whom the requester communicates may be a laboratory supervisor, a sample-receiving department, a salesperson for the laboratory, or the analyst himself. The analyst conducting the analysis is often a team, with custody of the sample being passed from sample receiving to the extraction laboratory, to the cleanup laboratory, to the gas chromatography (GC) laboratory, to the data reduction person, to the package preparation person, to the quality control (QC) department for verification, to shipping. Where a team of analysts is involved, the requester needs a central point of contact to minimize confusion and frustration. For the requester-analyst interface to work smoothly, it must function as if it is a one-to-one interaction. This article addresses the pitfalls of the requester-analyst interaction and provides suggestions for improving the quality of the analytical product through the requester-analyst interface

  15. 78 FR 75912 - Procurement List; Addition and Deletion

    Science.gov (United States)

    2013-12-13

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Addition to and deletion from the Procurement List. SUMMARY: This action adds a service to the Procurement...: General Services Administration, Fort Worth, TX Deletion On 11/1/2013 (78 FR 65618), the Committee for...

  16. 78 FR 27369 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2013-05-10

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and Deletion from the Procurement List. SUMMARY: This action adds products to the Procurement..., Philadelphia, PA. Deletion On 4/5/2013 (78 FR 20622-20623), the Committee for Purchase From People Who Are...

  17. 76 FR 5142 - Procurement List; Additions and Deletion

    Science.gov (United States)

    2011-01-28

    ... and Deletion AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Additions to and deletion from the Procurement List. SUMMARY: This action adds services to the Procurement.... Contracting Activity: Department of Transportation, Federal Aviation Administration, Jamaica, NY. Deletion On...

  18. 78 FR 21348 - Procurement List; Additions and Deletions; Recissions

    Science.gov (United States)

    2013-04-10

    ... COMMITTEE FOR PURCHASE FROM PEOPLE WHO ARE BLIND OR SEVERELY DISABLED Procurement List; Additions and Deletions; Recissions AGENCY: Committee for Purchase From People Who Are Blind or Severely Disabled. ACTION: Rescission of Previous Procurement List Decision. SUMMARY: The Committee for Purchase...

  19. Develop risk-based procurement management tools for SMEs

    NARCIS (Netherlands)

    Staal, Anne; Hagelaar, Geoffrey; Walhof, Gert; Holman, Richard

    2016-01-01

    This paper provides guidance for developing risk-based management tools to improve the procurement (purchasing) performance of SMEs. Extant academic literature only offers little support on developing such tools and does not consider the wide variety of SMEs. The paper defines a procurement tool for

  20. 20 CFR 638.806 - Property management and procurement.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Property management and procurement. 638.806 Section 638.806 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR JOB CORPS... management and procurement. The Job Corps Director shall develop procedures to establish and maintain a...

  1. 75 FR 36363 - Procurement List: Proposed Additions and Deletions

    Science.gov (United States)

    2010-06-25

    ... Homeland Security, U.S. Coast Guard, Washington, DC Service Type/Location: Laundry Service, USDA National... proposing to add products and services to the Procurement List that will be furnished by nonprofit agencies... Government identified in this notice will be required to procure the products and services listed below from...

  2. 76 FR 14942 - Procurement List; Additions and Deletions

    Science.gov (United States)

    2011-03-18

    ... DFAC. Service Type/Location: Laundry & Dry Cleaning Service, F.E. Warren, AFB, WY. NPA: Goodwill... Service Type/Location: Laundry Service, Atlanta VA Medical Center, Decatur, GA. NPA: GINFL Services, Inc...: Additions to and deletions from the Procurement List. SUMMARY: This action adds services to the Procurement...

  3. 75 FR 41449 - Procurement List Additions and Deletion

    Science.gov (United States)

    2010-07-16

    ... Customs and Border Protection, Office of Procurement, Washington, DC Service Type/Locations: Laundry.../Locations: Laundry Service, Naval Hospital System, 2800 Child Street, Jacksonville, FL NPA: GINFL Services...: Additions to and deletion from the Procurement List. SUMMARY: This action adds products and services to the...

  4. 76 FR 66913 - Procurement List Proposed Additions and Deletions

    Science.gov (United States)

    2011-10-28

    ...&M, Philadelphia, PA. Service Service Type/Location: Industrial Laundry Service, Bureau of Engraving... proposing to add products and service to the Procurement List that will be furnished by nonprofit agencies... identified in this notice will be required to procure the products and service listed below from nonprofit...

  5. 78 FR 53733 - Procurement List Additions and Deletions

    Science.gov (United States)

    2013-08-30

    .../Location: Industrial Laundry Service, Bureau of Engraving and Printing, 9000 Blue Mound Road, Fort Worth...: Additions to and Deletions from the Procurement List. SUMMARY: This action adds products and services to the... severe disabilities, and deletes services from the Procurement List previously provided by such agencies...

  6. 22 CFR 226.40 - Purpose of procurement standards.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Purpose of procurement standards. 226.40 Section 226.40 Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT ADMINISTRATION OF ASSISTANCE AWARDS TO U.S. NON-GOVERNMENTAL ORGANIZATIONS Post-award Requirements Procurement Standards § 226.40 Purpose...

  7. 48 CFR 1323.404-70 - DOC affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false DOC affirmative procurement program. 1323.404-70 Section 1323.404-70 Federal Acquisition Regulations System DEPARTMENT OF..., OCCUPATIONAL SAFETY, AND DRUG-FREE WORKPLACE Use of Recovered Materials 1323.404-70 DOC affirmative procurement...

  8. The impact of preferential procurement in South African construction ...

    African Journals Online (AJOL)

    The impact of preferential procurement in South African construction industry. ... The outcome of this study shows that there are problems in the implementation of PPPFA during tendering and procurement processes and procedures for achieving success in government projects. Key words: HDIs, PPPFA, Policies, ...

  9. Malawi : Country Procurement Assessment Report, Volume 3. Executive Summary

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  10. Malawi : Country Procurement Assessment Report, Volume 2. Details and Annexes

    OpenAIRE

    World Bank

    2004-01-01

    The Malawi Country Procurement Assessment Report is a joint undertaking between the Malawi Government and the World Bank to analyze the country procurement system and recommend appropriate actions to improve the efficiency, economy and transparency of the system. This report is divided into (a) an Executive Summary, (b) Main Report on Findings and Recommendations, and (c) Annexes. Since th...

  11. Ghana : Country Procurement Assessment Report, Volume 2. Main Report

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  12. Ghana : Country Procurement Assessment Report, Volume 5. Annex 9

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  13. Ghana : Country Procurement Assessment Report, Volume 1. Executive Summary

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  14. Ghana : Country Procurement Assessment Report, Volume 4. Annex 8

    OpenAIRE

    World Bank

    2003-01-01

    This report highlights a broad array of poor procedures and practices throughout the tendering and contract management process, which have been the cause of many of Ghana's public procurement problems, and where most of the leakages in public procurement funding occur and substantial savings could be realized. Most of the procedural anomalies are now being corrected by the Public Procureme...

  15. Strengthening Procurement Systems in Latin America and the ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the development of MSMEs and electronic commerce. Information and Communication Technologies (ICTs) are key to modernizing public administration systems in general and public procurement in particular. In 2002, national government procurement bodies established the Inter-American Network for Government ...

  16. Implementing Sustainable Public Procurement : an organisational change perspective

    NARCIS (Netherlands)

    J. Grandia (Jolien)

    2015-01-01

    markdownabstractFor the execution of policies, as well as for its own operations, governments procure goods and services, ranging from paper and pencils to fighter planes, cleaning services and public road works. In the European Union public procurement represents 16% of the gross domestic product.

  17. Corruption in Public Procurement: Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, J.; Deleanu, I.S.; Unger, B.

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  18. Corruption in Public Procurement : Finding the Right Indicators

    NARCIS (Netherlands)

    Ferwerda, Joras; Deleanu, Ioana; Unger, Brigitte

    2017-01-01

    Red flags are widely used to minimize the risk of various forms of economic misconduct, among which corruption in public procurement. Drawing on criminal investigations, the literature has developed several indicators of corruption in public procurements and has put them forward as viable risk

  19. The EU Public Procurement regime - Does It Work?

    DEFF Research Database (Denmark)

    Nielsen, Jørgen Ulff-Møller; Hansen, Lars Gottlieb

    2001-01-01

    Has the Single Market for public procurement had the expected effects after six years in progress? The following article attempts to answer this question by first presenting alternative theoretical approaches to analysing the EU liberalisation of the public procurement market and then confronting...

  20. 7 CFR 246.24 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... concerning violation of law are to be referred to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The State or local agency may use its own procurement regulations which reflect applicable State and local regulations, provided that procurements made with Program funds adhere...

  1. 7 CFR 215.14a - Procurement standards.

    Science.gov (United States)

    2010-01-01

    ... to the local, State or Federal authority that has proper jurisdiction. (c) Procedures. The State... food authority or child care institution may use its own procurement procedures which reflect applicable State or local laws and regulations, provided that procurements made with nonprofit school food...

  2. 7 CFR 249.21 - Procurement and property management.

    Science.gov (United States)

    2010-01-01

    ... to such local, State or Federal authority as may have proper jurisdiction. (c) State regulations. The... applicable State and local regulations; and (2) Any procurements made with SFMNP funds adhere to the... 7 Agriculture 4 2010-01-01 2010-01-01 false Procurement and property management. 249.21 Section...

  3. Procurement strategy formation : (re-)designing rail infrastructure project alliances

    NARCIS (Netherlands)

    Plantinga, Henrico; Dorée, André

    2016-01-01

    Purpose – The purpose of this paper is to provide insights into the reasoning behind the development of new procurement approaches by public sector clients. Design/methodology/approach – A case study approach focuses on a procurement development process by a public sector client. It investigates the

  4. 19 CFR 162.11 - Authority to procure warrants.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 2 2010-04-01 2010-04-01 false Authority to procure warrants. 162.11 Section 162.11 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY (CONTINUED) INSPECTION, SEARCH, AND SEIZURE Search Warrants § 162.11 Authority to procure...

  5. Public procurement of innovation in construction : A design science approach

    NARCIS (Netherlands)

    Lenderink, B.; Halman, J. I.M.; Voordijk, J.T.

    2016-01-01

    The inclusion of innovation as a policy objective in public procurement has increased significantly at public organizations over the last years. However, public organizations often struggle with how they should stimulate innovation through public procurement as there are many different ways possible

  6. 48 CFR 2901.603-72 - Administrative procurement management reviews.

    Science.gov (United States)

    2010-10-01

    ... Authority, and Responsibilities 2901.603-72 Administrative procurement management reviews. (a) The Senior... 48 Federal Acquisition Regulations System 7 2010-10-01 2010-10-01 false Administrative procurement management reviews. 2901.603-72 Section 2901.603-72 Federal Acquisition Regulations System DEPARTMENT OF...

  7. London 2012 packaging guidelines

    OpenAIRE

    2013-01-01

    These guidelines are intended to provide supplemental advice to suppliers and licensees regarding the provisions of the LOCOG Sustainable Sourcing Code that relate to packaging design and materials selection.

  8. Type B Drum packages

    International Nuclear Information System (INIS)

    Edwards, W.S.

    1995-11-01

    The Type B Drum package is a container in which a single drum containing Type B quantities of radioactive material will be packaged for shipment. The Type B Drum containers are being developed to fill a void in the packaging and transportation capabilities of the US Department of Energy (DOE), as no double containment packaging for single drums of Type B radioactive material is currently available. Several multiple-drum containers and shielded casks presently exist. However, the size and weight of these containers present multiple operational challenges for single-drum shipments. The Type B Drum containers will offer one unshielded version and, if needed, two shielded versions, and will provide for the option of either single or double containment. The primary users of the Type B Drum container will be any organization with a need to ship single drums of Type B radioactive material. Those users include laboratories, waste retrieval facilities, emergency response teams, and small facilities

  9. Materials for advanced packaging

    CERN Document Server

    Wong, CP

    2017-01-01

    This second edition continues to be the most comprehensive review on the developments in advanced electronic packaging technologies, with a focus on materials and processing. Recognized experts in the field contribute to 22 updated and new chapters that provide comprehensive coverage on various 3D package architectures, novel bonding and joining techniques, wire bonding, wafer thinning techniques, organic substrates, and novel approaches to make electrical interconnects between integrated circuit and substrates. Various chapters also address advances in several key packaging materials, including: Lead-free solders Flip chip underfills Epoxy molding compounds Conductive adhesives Die attach adhesives/films Thermal interface materials (TIMS) Materials for fabricating embedded passives including capacitors, inductors, and resistors Materials and processing aspects on wafer-level chip scale package (CSP) and MicroElectroMechanical system (MEMS) Contributors also review new and emerging technologies such as Light ...

  10. Food irradiation and packaging

    International Nuclear Information System (INIS)

    Kilcast, David

    1988-01-01

    This outline review was written for 'Food Manufacture'. It deals with the known effects of irradiation on current packaging materials (glass, cellulosics, organic polymers and metals), and their implications for the effective application of the process. (U.K.)

  11. FLEXIBLE FOOD PACKAGING LABORATORY

    Data.gov (United States)

    Federal Laboratory Consortium — This laboratory contains equipment to fabricate and test prototype packages of many types and sizes (e.g., bags, pouches, trays, cartons, etc.). This equipment can...

  12. BCRA R Package

    Science.gov (United States)

    BCRA is an R package that projects absolute risk of invasive breast cancer according to NCI’s Breast Cancer Risk Assessment Tool (BCRAT) algorithm for specified race/ethnic groups and age intervals.

  13. The ENSDF Java Package

    International Nuclear Information System (INIS)

    Sonzogni, A.A.

    2005-01-01

    A package of computer codes has been developed to process and display nuclear structure and decay data stored in the ENSDF (Evaluated Nuclear Structure Data File) library. The codes were written in an object-oriented fashion using the java language. This allows for an easy implementation across multiple platforms as well as deployment on web pages. The structure of the different java classes that make up the package is discussed as well as several different implementations

  14. Energy and packaging

    Energy Technology Data Exchange (ETDEWEB)

    Boustead, I; Hancock, G F

    1981-01-01

    Information is given on the energy and raw materials required in the production and use of containers used to package beer, cider, and carbonated soft drinks in the United Kingdom. Topics covered include: methodology of energy analysis, primary and secondary fuels, transport, packaging materials, including glass, aluminum, iron, steel, and tinplate, container production, including plastic bottles, distribution of empty containers, filling and packing, distribution, and disposal. (LEW)

  15. Procurement Practices for the Composite Armored Vehicle and Composite Affordability Initiative Programs

    National Research Council Canada - National Science Library

    Granetto, Paul

    1999-01-01

    The audit objective was to determine whether violations of procurement regulations occurred regarding procurement of selected components of the Army Crusader vehicle and the Joint Strike Fighter aircraft...

  16. International Government-Procurement Obligations of the United States: An Overview

    National Research Council Canada - National Science Library

    Tatelman, Todd B

    2005-01-01

    .... The most notable agreements are contained in the World Trade Organization (WTO) Agreement on Government Procurement and the procurement chapter of the North American Free Trade Agreement (NAFTA...

  17. The role and duties of client in public procurement management

    Directory of Open Access Journals (Sweden)

    Joković Radomir V.

    2015-01-01

    Full Text Available Public procurement is given great importance in all developed countries. The subject of this paper is to present the application of basic concepts of project management from the standpoint of public procurement in the higher education institution. Previous research, by examining the literature of domestic and foreign authors, and analysis of project performance management model is defined by the public procurement in the higher education institution whose application can improve overall process performance lrojekta and contribute to economic and efficient implementation of planned activities and time for reaching the goals. One of the objectives of model application of project management procurement at a higher education institution is to identify and determine the type and quantity of goods, uspuga, works, studies of conditions that influence their purchase, as well as finding ways of ensuring that goods, services, papers are available on the project in due time. This paper presents a model of project management public procurement in the higher education institution.

  18. Comparative Packaging Study

    Science.gov (United States)

    Perchonok, Michele H.; Oziomek, Thomas V.

    2009-01-01

    Future long duration manned space flights beyond low earth orbit will require the food system to remain safe, acceptable and nutritious. Development of high barrier food packaging will enable this requirement by preventing the ingress and egress of gases and moisture. New high barrier food packaging materials have been identified through a trade study. Practical application of this packaging material within a shelf life test will allow for better determination of whether this material will allow the food system to meet given requirements after the package has undergone processing. The reason to conduct shelf life testing, using a variety of packaging materials, stems from the need to preserve food used for mission durations of several years. Chemical reactions that take place during longer durations may decrease food quality to a point where crew physical or psychological well-being is compromised. This can result in a reduction or loss of mission success. The rate of chemical reactions, including oxidative rancidity and staling, can be controlled by limiting the reactants, reducing the amount of energy available to drive the reaction, and minimizing the amount of water available. Water not only acts as a media for microbial growth, but also as a reactant and means by which two reactants may come into contact with each other. The objective of this study is to evaluate three packaging materials for potential use in long duration space exploration missions.

  19. Risk Factors Influencing Construction Procurement Performance in Nigeria

    Directory of Open Access Journals (Sweden)

    Alhassan Dahiru

    2015-08-01

    Full Text Available One of the challenges facing construction procurement performance is the failure to determine the risk related factors limiting its success. These risk factors can cause a significant increase in the procurement cost leading to an increase in the overall project cost. The purpose of this study is to identify and evaluate the risk factors influencing construction procurement performance with a view to achieve the overall project performance. The objectives are to establish a relative significance index score for the most important risk factors limiting the procurement performance of the projects. A self administered questionnaire was employed to the construction industry professionals for responses. A total of 78 questionnaires were distributed to these professionals (architects, quantity surveyors, engineers, and contractors but 62 were returned and analyzed using influential index and later ranked in order of importance. Results of the analysis indicate a disparity in terms of ranking of the factors influencing construction procurement performance. Corruption related risk, conflict of interest, ineffective project technical feasibility, and lack of commitment to transparency were found to be the most significant factors limiting construction procurement performance. Communication barriers and unconfidential tender evaluation process were found to be the low weighted risk factors. The findings can serve as a supportive mechanism for risks management in public construction procurement management. Therefore, construction procurement personnel at all levels of government may find this study relevant, while improving construction procurement performance in the country. It is recommended that construction procurement system should be focused on risks related to corruption, conflict of interest, and effective technical feasibility for improving the overall project performance.

  20. Experience of air transport of nuclear fuel material as type A package

    International Nuclear Information System (INIS)

    Kawasaki, Masashi; Kageyama, Tomio; Suzuki, Toru

    2004-01-01

    Special law on nuclear disaster countermeasures (hereafter called as to nuclear disaster countermeasures low) that is domestic law for dealing with measures for nuclear disaster, was enforced in June, 2000. Therefore, nuclear enterprise was obliged to report accidents as required by nuclear disaster countermeasures law, besides meeting the technical requirement of existent transport regulation. For overseas procurement of plutonium reference materials that are needed for material accountability, A Type package must be transported by air. Therefore, concept of air transport of nuclear fuel materials according to the nuclear disaster countermeasures law was discussed, and the manual including measures against accident in air transport was prepared for the oversea procurement. In this presentation, the concept of air transport of A Type package containing nuclear fuel materials according to the nuclear disaster countermeasures law, and the experience of a transportation of plutonium solution from France are shown. (author)

  1. An Identification of Problems Relating to Federal Procurement of Library Materials Prepared for Commission on Government Procurement.

    Science.gov (United States)

    Federal Library Committee, Washington, DC.

    The Federal Library Committee through the Task Force on Procurement Procedures in Federal Libraries is examining all problems and is recommending policies, procedures, and practices which will maximize the efficient procurement of library materials. It is suggested that the vehicle for this investigation be the appropriate Commission on Government…

  2. Procurement of green electricity. Guideline for a Europe-wide tender of the supply of green electricity in an open procedure; Beschaffung von Oekostrom. Arbeitshilfe fuer eine europaweite Ausschreibung der Lieferung von Oekostrom im offenen Verfahren

    Energy Technology Data Exchange (ETDEWEB)

    Buchmueller, Christian; Schnutenhaus, Joern [Schnutenhaus und Kollegen, Berlin (Germany)

    2013-05-02

    The power generation from fossil fuels causes high emissions of greenhouse gases. The reduction of the power consumption and the purchase of green power pertain to the politically effective climate protection measures. These emissions can be reduced immediately by means of the purchase of green power. The brochure under consideration details the procurement law and technical foundations of this concept for the procurement of green electricity. Part I of this brochure presents the procurement legal framework and the key points of the concept. In part II concrete assistance for the purchase of green power is given. In Part III, further links are compiled.

  3. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2006-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with 10 Code of Federal Regulations (CFR) 1.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. CBFO will evaluate the issue and notify the NRC if required. In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous location where the activities subject to these

  4. RH Packaging Program Guidance

    International Nuclear Information System (INIS)

    2008-01-01

    The purpose of this program guidance document is to provide the technical requirements for use, operation, inspection, and maintenance of the RH-TRU 72-B Waste Shipping Package (also known as the 'RH-TRU 72-B cask') and directly related components. This document complies with the requirements as specified in the RH-TRU 72-B Safety Analysis Report for Packaging (SARP), and Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9212. If there is a conflict between this document and the SARP and/or C of C, the C of C shall govern. The C of C states: 'each package must be prepared for shipment and operated in accordance with the procedures described in Chapter 7.0, Operating Procedures, of the application.' It further states: 'each package must be tested and maintained in accordance with the procedures described in Chapter 8.0, Acceptance Tests and Maintenance Program of the Application.' Chapter 9.0 of the SARP tasks the Waste Isolation Pilot Plant (WIPP) Management and Operating (M and O) Contractor with assuring the packaging is used in accordance with the requirements of the C of C. Because the packaging is NRC-approved, users need to be familiar with Title 10 Code of Federal Regulations (CFR) 71.8, 'Deliberate Misconduct.' Any time a user suspects or has indications that the conditions of approval in the C of C were not met, the U.S. Department of Energy (DOE) Carlsbad Field Office (CBFO) shall be notified immediately. The CBFO will evaluate the issue and notify the NRC if required.In accordance with 10 CFR Part 71, 'Packaging and Transportation of Radioactive Material,' certificate holders, packaging users, and contractors or subcontractors who use, design, fabricate, test, maintain, or modify the packaging shall post copies of (1) 10 CFR Part 21, 'Reporting of Defects and Noncompliance,' regulations, (2) Section 206 of the Energy Reorganization Act of 1974, and (3) NRC Form 3, Notice to Employees. These documents must be posted in a conspicuous

  5. Application of GA package in functional packaging

    Science.gov (United States)

    Belousova, D. A.; Noskova, E. E.; Kapulin, D. V.

    2018-05-01

    The approach to application program for the task of configuration of the elements of the commutation circuit for design of the radio-electronic equipment on the basis of the genetic algorithm is offered. The efficiency of the used approach for commutation circuits with different characteristics for computer-aided design on radio-electronic manufacturing is shown. The prototype of the computer-aided design subsystem on the basis of a package GA for R with a set of the general functions for optimization of multivariate models is programmed.

  6. Food Packaging Materials

    Science.gov (United States)

    1978-01-01

    The photos show a few of the food products packaged in Alure, a metallized plastic material developed and manufactured by St. Regis Paper Company's Flexible Packaging Division, Dallas, Texas. The material incorporates a metallized film originally developed for space applications. Among the suppliers of the film to St. Regis is King-Seeley Thermos Company, Winchester, Ma'ssachusetts. Initially used by NASA as a signal-bouncing reflective coating for the Echo 1 communications satellite, the film was developed by a company later absorbed by King-Seeley. The metallized film was also used as insulating material for components of a number of other spacecraft. St. Regis developed Alure to meet a multiple packaging material need: good eye appeal, product protection for long periods and the ability to be used successfully on a wide variety of food packaging equipment. When the cost of aluminum foil skyrocketed, packagers sought substitute metallized materials but experiments with a number of them uncovered problems; some were too expensive, some did not adequately protect the product, some were difficult for the machinery to handle. Alure offers a solution. St. Regis created Alure by sandwiching the metallized film between layers of plastics. The resulting laminated metallized material has the superior eye appeal of foil but is less expensive and more easily machined. Alure effectively blocks out light, moisture and oxygen and therefore gives the packaged food long shelf life. A major packaging firm conducted its own tests of the material and confirmed the advantages of machinability and shelf life, adding that it runs faster on machines than materials used in the past and it decreases product waste; the net effect is increased productivity.

  7. 76 FR 55882 - Procurement List; Addition

    Science.gov (United States)

    2011-09-09

    ... or severely disabled for not less than 75% of the direct hours required for the production or... contractor that currently provides powder laundry detergent to the Government. The incumbent contractor... detergent containers, as well as packaging the product for sale and delivery. This will maximize employment...

  8. Procurement of replacement pressure vessels for MURR

    International Nuclear Information System (INIS)

    Meyer, W.A. Jr.; Edwards, C.B. Jr.; McKibben, J.C.; Schoone, A.R.

    1989-01-01

    The University of Missouri Research Reactor Facility (MURR) located in Columbia, Missouri, is the highest powered, highest steady-state flux university research reactor in the United States. The reactor is a 10-MW pressurized loop, in-pool-type, light-water-moderated, beryllium-reflected, flux trap reactor. MURR has a compact core (0.033 m 3 ) composed of eight fuel elements of the materials test reactor type arranged as an annular right circular cylinder between the inner and outer aluminum pressure vessels. Conservative engineering judgment resulted in the decision in 1988 to purchase new inner and outer pressure vessels. This paper details the difficulties encountered in procuring replacements for aluminum pressure vessels built to standards that are no longer applicable in attempting to meet nuclear standards that are not applicable to nonferrous material

  9. AN EDUCATIONAL GAME IN CONSTRUCTION PROCUREMENT NEGOTIATION

    Directory of Open Access Journals (Sweden)

    Ren-Jye Dzeng

    2013-06-01

    Full Text Available Project managers are frequently required to negotiate during the procurement of construction materials and drawing up of contractual agreements. Training in negotiation training requires hands-on experience and interaction with multiple parties. However, in the conventional curriculum on construction management, negotiation is taught merely through lectures and case studies. This study addressed that shortcoming by developing a portfolio negotiation game in which students play different roles and actively make decisions while proceeding through a simulated negotiation process in a competitive context. The proposed game would be the first negotiation game within the domain of the construction industry. During the pilot study, 46 students (with or without industrial working experience played the game; the results showed an increase in learning interest, satisfaction, and effectiveness.

  10. Penetrating Internet Information Services (IIS).

    African Journals Online (AJOL)

    PROF. O. E. OSUAGWU

    2013-12-01

    Dec 1, 2013 ... Information Services (IIS) packages have been presented. Note that while some of ... encompasses a variety of services including FTP, SMTP ..... for Web-based Distributed Authoring ... denial-of-service vulnerabilities we have.

  11. Food packages for Space Shuttle

    Science.gov (United States)

    Fohey, M. F.; Sauer, R. L.; Westover, J. B.; Rockafeller, E. F.

    1978-01-01

    The paper reviews food packaging techniques used in space flight missions and describes the system developed for the Space Shuttle. Attention is directed to bite-size food cubes used in Gemini, Gemini rehydratable food packages, Apollo spoon-bowl rehydratable packages, thermostabilized flex pouch for Apollo, tear-top commercial food cans used in Skylab, polyethylene beverage containers, Skylab rehydratable food package, Space Shuttle food package configuration, duck-bill septum rehydration device, and a drinking/dispensing nozzle for Space Shuttle liquids. Constraints and testing of packaging is considered, a comparison of food package materials is presented, and typical Shuttle foods and beverages are listed.

  12. Welding robot package; Arc yosetsu robot package

    Energy Technology Data Exchange (ETDEWEB)

    Nishikawa, S. [Yaskawa Electric Corp., Kitakyushu (Japan)

    1998-09-01

    For the conventional high-speed welding robot, the welding current was controlled mainly for reducing the spatters during short circuits and for stabilizing the beads by the periodic short circuits. However, an increase of deposition amount in response to the speed is required for the high-speed welding. Large-current low-spatter welding current region control was added. Units were integrated into a package by which the arc length is kept in short without dispersion of arc length for welding without defects such as undercut and unequal beads. In automobile industry, use of aluminum parts is extended for the light weight. The welding is very difficult, and automation is not so progressing in spite of the poor environment. Buckling of welding wire is easy to occur, and supply of wire is obstructed by the deposition of chipped powders on the torch cable, which stay within the contact chip resulting in the deposition. Dislocation of locus is easy to occur at the corner of rectangular pipe during the welding. By improving these troubles, an aluminum MIG welding robot package has been developed. 13 figs.

  13. An investigation into the effectiveness of public entities’ procurement practices

    Directory of Open Access Journals (Sweden)

    Moitswadi Mofokeng

    2014-11-01

    Full Text Available The delivery of services through the procurement of goods and services requires proper strategic leadership and management processes. Inappropriate planning, under-spending of budgets and ineffective procurement form part of the root causes of poor service delivery, as this restricts the movement of resources to the right places. This study identified the leading procurement practices as: procurement strategy and leadership, the procurement process, human resource management, procurement information systems, supplier management and procurement performance management. These practices were then tested in public entities, mainly in Gauteng Province, South Africa, to determine the extent to which they are applied. The study found that there is a major divide between the perception of the level of application of the leading practices and actual implementation. Processes, skills, performance management, information technology (IT systems and supplier management are applied inadequately or inappropriately. Most entities thus show a poor understanding of customer needs and there seems to be a general lack of customer focus. The study highlighted the best practice areas in which public entities are able to focus their efforts to better achieve excellent customer service and thus service delivery.

  14. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  15. Transportation Service Procurement Bid Construction Problem from Less Than Truckload Perspective

    Directory of Open Access Journals (Sweden)

    Fang Yan

    2018-01-01

    Full Text Available This paper presents mixed integer programming for a transportation service procurement bid construction problem from a less than full truckload perspective, in which the bidders (carriers generate their best bid (package using a bundled price to maximize their utility and increase the chance of winning the business. The models are developed from both the carriers and shippers perspectives to establish a relationship between the quoted price and the likelihood of winning to assist the carriers in balancing the potential benefits and the possibility of winning the bid. An intelligent algorithm based on Particle Swarm Optimization is then designed to solve the proposed model and hypothetical data sets are used to test the effectiveness and efficiency of the proposed model and algorithm.

  16. Waste package characterisation

    Energy Technology Data Exchange (ETDEWEB)

    Sannen, L.; Bruggeman, M.; Wannijn, J.P

    1998-09-01

    Radioactive wastes originating from the hot labs of the Belgian Nuclear Research Centre SCK-CEN contain a wide variety of radiotoxic substances. The accurate characterisation of the short- and long-term radiotoxic components is extremely difficult but required in view of geological disposal. This paper describes the methodology which was developed and adopted to characterise the high- and medium-level waste packages at the SCK-CEN hot laboratories. The proposed method is based on the estimation of the fuel inventory evacuated in a particular waste package; a calculation of the relative fission product contribution on the fuel fabrication and irradiation footing; a comparison of the calculated, as expected, dose rate and the real measured dose rate of the waste package. To cope with the daily practice an appropriate fuel inventory estimation route, a user friendly computer programme for fission product and corresponding dose rate calculation, and a simple dose rate measurement method have been developed and implemented.

  17. Waste package characterisation

    International Nuclear Information System (INIS)

    Sannen, L.; Bruggeman, M.; Wannijn, J.P.

    1998-09-01

    Radioactive wastes originating from the hot labs of the Belgian Nuclear Research Centre SCK-CEN contain a wide variety of radiotoxic substances. The accurate characterisation of the short- and long-term radiotoxic components is extremely difficult but required in view of geological disposal. This paper describes the methodology which was developed and adopted to characterise the high- and medium-level waste packages at the SCK-CEN hot laboratories. The proposed method is based on the estimation of the fuel inventory evacuated in a particular waste package; a calculation of the relative fission product contribution on the fuel fabrication and irradiation footing; a comparison of the calculated, as expected, dose rate and the real measured dose rate of the waste package. To cope with the daily practice an appropriate fuel inventory estimation route, a user friendly computer programme for fission product and corresponding dose rate calculation, and a simple dose rate measurement method have been developed and implemented

  18. Waste package reliability analysis

    International Nuclear Information System (INIS)

    Pescatore, C.; Sastre, C.

    1983-01-01

    Proof of future performance of a complex system such as a high-level nuclear waste package over a period of hundreds to thousands of years cannot be had in the ordinary sense of the word. The general method of probabilistic reliability analysis could provide an acceptable framework to identify, organize, and convey the information necessary to satisfy the criterion of reasonable assurance of waste package performance according to the regulatory requirements set forth in 10 CFR 60. General principles which may be used to evaluate the qualitative and quantitative reliability of a waste package design are indicated and illustrated with a sample calculation of a repository concept in basalt. 8 references, 1 table

  19. Sustainable promotion nuclear power enterprise procurement bidding risk management

    International Nuclear Information System (INIS)

    Wu Yimin

    2014-01-01

    Nuclear power enterprise procurement bidding work faced with certain risk in recent years, the domestic nuclear power enterprises in the bidding work never stop research and explore the effective ways to guard against legal risks, and has made considerable progress, the eighteenth big country advocates the safety and efficiency of nuclear power development policy, in the face of the subsequent nuclear power construction projects have started, nuclear power enterprise bidding risk management work shoulder heavy responsibilities article through nuclear power enterprise procurement bidding risk management present situation, proposed the sustainable promotion nuclear power enterprise procurement bidding risk management countermeasures. (author)

  20. A Framework for Usability Evaluation in EHR Procurement.

    Science.gov (United States)

    Tyllinen, Mari; Kaipio, Johanna; Lääveri, Tinja

    2018-01-01

    Usability should be considered already by the procuring organizations when selecting future systems. In this paper, we present a framework for usability evaluation during electronic health record (EHR) system procurement. We describe the objectives of the evaluation, the procedure, selected usability attributes and the evaluation methods to measure them. We also present the emphasis usability had in the selection process. We do not elaborate on the details of the results, the application of methods or gathering of data. Instead we focus on the components of the framework to inform and give an example to other similar procurement projects.

  1. Corporate Social Responsibility and Sustainability in Danish Public Procurement

    DEFF Research Database (Denmark)

    Andrecka, Marta

    2017-01-01

    understand the continuously developing concepts of SPP, as well as to identify the drivers and barriers that promote or hinder its further implementation. This article firstly deals with the relationship between the concepts of sustainability, Corporate Social Responsibility (CSR) and public procurement....... Secondly, as Denmark has been known as a pioneer in sustainable development, including implementation of it in public purchasing this article focuses on recent developments in the areas of CSR and sustainable public procurement in Denmark, and analyses relevant Danish Public Procurement Complaints Board...

  2. E-PROCUREMENT: IMPORTANCIA Y APLICACIÓN

    Directory of Open Access Journals (Sweden)

    Isabel Fernández Quesada

    2003-04-01

    Full Text Available En el trabajo se aborda uno de los aspectos externos del e-business: el e-procurement. Se valora la importancia de la utilización de la red en general y en la función logística y de compras, en particular. Partiendo de las actividades tradicionales de compras, se explicitan las ventajas que supone respecto a ellas el e-procurement y la importancia estratégica de su aplicación. Asimismo, se profundiza en el propio concepto de e-procurement y en su arquitectura desde el punto de vista de su implantación empresarial.

  3. Procuring load curtailment from local customers under uncertainty.

    Science.gov (United States)

    Mijatović, Aleksandar; Moriarty, John; Vogrinc, Jure

    2017-08-13

    Demand side response (DSR) provides a flexible approach to managing constrained power network assets. This is valuable if future asset utilization is uncertain. However there may be uncertainty over the process of procurement of DSR from customers. In this context we combine probabilistic modelling, simulation and optimization to identify economically optimal procurement policies from heterogeneous customers local to the asset, under chance constraints on the adequacy of the procured DSR. Mathematically this gives rise to a search over permutations, and we provide an illustrative example implementation and case study.This article is part of the themed issue 'Energy management: flexibility, risk and optimization'. © 2017 The Author(s).

  4. Use of commercial grade item dedication to reduce procurement costs

    International Nuclear Information System (INIS)

    Rosch, F.

    1995-01-01

    In the mid-1980s, the Nuclear Regulatory Industry (NRC) began inspecting utility practices of procuring and dedicating commercial grade items intended for plant safety-related applications. As a result of the industry efforts to address NRC concerns, nuclear utilities have enhanced existing programs and procedures for dedication of commercial grade items. Though these programs were originally enhanced to meet NRC concerns, utilities have discovered that the dedication of commercial grade items can also reduce overall procurement costs. This paper will discuss the enhancement of utility dedication programs and demonstrates how utilities have utilized them to reduce procurement costs

  5. QA in the procurement of items and services

    International Nuclear Information System (INIS)

    Wilhelm, H.

    1980-01-01

    Procurement of items and services is one of the important elements during the design and construction of Nuclear Power Plants. The purchaser has to establish and implement controls over the procurement process to ensure that the quality criteria, quality level and other quality requirements specified for the particuliar item or service are taken into account. The effect on safety of an error in service or the malfunction of an item is the most important factor to be considered in determining the extent of quality assurance efforts. A typical example of a procurement process will be demonstrated for safety related mechanical components. (orig./RW)

  6. Future Capacity Procurements Under Unknown Demand and Increasing Costs

    OpenAIRE

    Apostolos Burnetas; Stephen Gilbert

    2001-01-01

    In this paper we study a situation in which a broker must manage the procurement of a short-life-cycle product. As the broker observes demand for the item, she learns about the demand process. However, as is often the case in practice, it becomes either more difficult or more expensive to procure the item as the selling season advances. Thus, the broker must trade off higher procurement costs against the benefit of making ordering decisions with better information about demand. Problems of th...

  7. SPHINX experimenters information package

    International Nuclear Information System (INIS)

    Zarick, T.A.

    1996-08-01

    This information package was prepared for both new and experienced users of the SPHINX (Short Pulse High Intensity Nanosecond X-radiator) flash X-Ray facility. It was compiled to help facilitate experiment design and preparation for both the experimenter(s) and the SPHINX operational staff. The major areas covered include: Recording Systems Capabilities,Recording System Cable Plant, Physical Dimensions of SPHINX and the SPHINX Test cell, SPHINX Operating Parameters and Modes, Dose Rate Map, Experiment Safety Approval Form, and a Feedback Questionnaire. This package will be updated as the SPHINX facilities and capabilities are enhanced

  8. Nirex - The complete package

    International Nuclear Information System (INIS)

    Carr, N.A.; Rarok, M.

    2002-01-01

    Through continuous interaction with its customers, Nirex had identified the need for a comprehensive range of waste containers, reflecting the variety of wastes and operational undertakings. The current range consists of five standard containers. Standardisation is introduced across all waste packages to enable the safe and efficient operation of future waste management facilities. The practical lessons learned during the development of standard containers are in turn reflected in the container design work that Nirex has undertaken. They are also fed into the advice given to customers during evaluation of waste packaging proposals. (author)

  9. Ada Namelist Package

    Science.gov (United States)

    Klumpp, Allan R.

    1991-01-01

    Ada Namelist Package, developed for Ada programming language, enables calling program to read and write FORTRAN-style namelist files. Features are: handling of any combination of types defined by user; ability to read vectors, matrices, and slices of vectors and matrices; handling of mismatches between variables in namelist file and those in programmed list of namelist variables; and ability to avoid searching entire input file for each variable. Principle benefits derived by user: ability to read and write namelist-readable files, ability to detect most file errors in initialization phase, and organization keeping number of instantiated units to few packages rather than to many subprograms.

  10. Packaging Solutions : Delivering customer value through Logistical Packaging: A Case Study at Stora Enso Packaging

    OpenAIRE

    Shan, Kun; Julius, Joezer

    2015-01-01

    AbstractBackground;Despite of the significant role of packaging within logistics and supply chain management, packaging is infrequently studied as focal point in supply chain. Most of the previous logistics research studies tend to explain the integration between packaging and logistics through logistical packaging. In very rare cases, the studies mentioned about customer value. Therefore the major disadvantage of these studies is that, they didn’t consider logistical packaging and customer v...

  11. 41 CFR 101-26.602-1 - Procurement of lubricating oils, greases, and gear lubricants.

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Procurement of... Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS SUPPLY AND PROCUREMENT 26-PROCUREMENT SOURCES AND PROGRAM 26.6-Procurement Sources Other Than GSA § 101...

  12. 76 FR 53113 - Guidelines for Designating Biobased Products for Federal Procurement

    Science.gov (United States)

    2011-08-25

    ... Designating Biobased Products for Federal Procurement AGENCY: Office of Procurement and Property Management... that the Department of Agriculture, Office of Procurement and Property Management, is hereby requesting... comments to: Ron Buckhalt, USDA, Office of Procurement and Property Management, Room 361, Reporters...

  13. Public procurement as a tool to drive innovation in South Africa ...

    African Journals Online (AJOL)

    This article is an analysis of the use of public procurement as a tool to drive innovation. It explores the meaning of innovative procurement or public procurement of innovation, as well as the rationale for using public procurement to drive innovation. It then focuses on South Africa and evaluates whether there is scope within ...

  14. Entering the United States Federal Procurement Market: success factors and barriers for foreign firms.

    NARCIS (Netherlands)

    Vehof, Tim; Telgen, Jan; Ruel, Hubertus Johannes Maria; Ruel, H.J.M.

    2012-01-01

    The US federal procurement market is the largest procurement market in the world. Therefore, it is an attractive market for foreign companies to enter. Existing literature indicates the success factors and barriers for public procurement market entry in general, however not for the US procurement

  15. 13 CFR 121.407 - What are the size procedures for multiple item procurements?

    Science.gov (United States)

    2010-01-01

    ... Requirements for Government Procurement § 121.407 What are the size procedures for multiple item procurements? If a procurement calls for two or more specific end items or types of services with different size... multiple item procurements? 121.407 Section 121.407 Business Credit and Assistance SMALL BUSINESS...

  16. The World Bank Group and Public Procurement--An Independent Evaluation : Appendixes to Volume 1

    OpenAIRE

    Independent Evaluation Group

    2014-01-01

    Good public procurement practices are a major determinant of the effectiveness of public expenditure. On behalf of their citizens, governments typically spend as much as 5-20 percent of their gross domestic product on procurement of goods and services, and effective procurement policies enable better use of government budgets. Good national procurement practices are therefore an essential ...

  17. 76 FR 76808 - Procurement Thresholds for Implementation of the Trade Agreements Act of 1979

    Science.gov (United States)

    2011-12-08

    ... Organization (WTO) Agreement on Government Procurement, Chapter 15 of the United States-Australia Free Trade... out U.S. trade agreement obligations under the WTO Agreement on Government Procurement, Chapter 15 of... Agreement on Government Procurement A. Central Government Entities Listed in U.S. Annex 1 (1) Procurement of...

  18. AN ADA NAMELIST PACKAGE

    Science.gov (United States)

    Klumpp, A. R.

    1994-01-01

    The Ada Namelist Package, developed for the Ada programming language, enables a calling program to read and write FORTRAN-style namelist files. A namelist file consists of any number of assignment statements in any order. Features of the Ada Namelist Package are: the handling of any combination of user-defined types; the ability to read vectors, matrices, and slices of vectors and matrices; the handling of mismatches between variables in the namelist file and those in the programmed list of namelist variables; and the ability to avoid searching the entire input file for each variable. The principle user benefits of this software are the following: the ability to write namelist-readable files, the ability to detect most file errors in the initialization phase, a package organization that reduces the number of instantiated units to a few packages rather than to many subprograms, a reduced number of restrictions, and an increased execution speed. The Ada Namelist reads data from an input file into variables declared within a user program. It then writes data from the user program to an output file, printer, or display. The input file contains a sequence of assignment statements in arbitrary order. The output is in namelist-readable form. There is a one-to-one correspondence between namelist I/O statements executed in the user program and variables read or written. Nevertheless, in the input file, mismatches are allowed between assignment statements in the file and the namelist read procedure statements in the user program. The Ada Namelist Package itself is non-generic. However, it has a group of nested generic packages following the nongeneric opening portion. The opening portion declares a variety of useraccessible constants, variables and subprograms. The subprograms are procedures for initializing namelists for reading, reading and writing strings. The subprograms are also functions for analyzing the content of the current dataset and diagnosing errors. Two nested

  19. Influence of non-radioactive payload parameters on radioactive shipping packages

    International Nuclear Information System (INIS)

    Drez, P.E.; Murthy, D.V.S.; Temus, C.J.; Quinn, G.J.; Ozaki, C.

    1989-01-01

    The transport of radioactive waste materials in radioactive material (RAM) packages involves two components: the packaging used for transportation, and the waste which forms the payload. The payload is usually comprised of non-radioactive materials contaminated with radionuclides. The non-radionuclide payload characteristics can often be a controlling factor in determining the restrictions imposed on the certification of the package. This paper describes these package/payload interactions and the limiting parameters for the Transuranic Package Transporter-II (TRUPACT-II), designed for the transportation of Contact Handled Transuranic (CH-TRU) waste. The parameters discussed include the physical and chemical form of the payload, the configuration of the waste, and resulting gas generation and gas release phenomena. Brief descriptions of the TRUPACT-II package and its payload are presented initially

  20. Radioactive waste disposal package

    Science.gov (United States)

    Lampe, Robert F.

    1986-11-04

    A radioactive waste disposal package comprising a canister for containing vitrified radioactive waste material and a sealed outer shell encapsulating the canister. A solid block of filler material is supported in said shell and convertible into a liquid state for flow into the space between the canister and outer shell and subsequently hardened to form a solid, impervious layer occupying such space.

  1. ROBATEL RS 24 packaging

    International Nuclear Information System (INIS)

    Robatel, M.; Bochard, C.

    1986-01-01

    The ROBATEL RS 24 packaging for light-water reactor fuel assemblies is discussed. The cask uses a strength frame of carbon steel sheets, lead gamma ray shielding, neutron shielding of aluminous concrete, a thermal protection system for the gamma shielding, and a natural convection thermal transfer system

  2. The Swarm Magnetometry Package

    DEFF Research Database (Denmark)

    Merayo, José M.G.; Jørgensen, John Leif; Friis-Christensen, Eigil

    2008-01-01

    The Swarm mission under the ESA's Living Planet Programme is planned for launch in 2010 and consists of a constellation of three satellites at LEO. The prime objective of Swarm is to measure the geomagnetic field with unprecedented accuracy in space and time. The magnetometry package consists...

  3. Learning Activity Package, Algebra.

    Science.gov (United States)

    Evans, Diane

    A set of ten teacher-prepared Learning Activity Packages (LAPs) in beginning algebra and nine in intermediate algebra, these units cover sets, properties of operations, number systems, open expressions, solution sets of equations and inequalities in one and two variables, exponents, factoring and polynomials, relations and functions, radicals,…

  4. Geothermal Greenhouse Information Package

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, K. [P.E.; Boyd, T. [ed.

    1997-01-01

    This package of information is intended to provide a foundation of background information for developers of geothermal greenhouses. The material is divided into seven sections covering such issues as crop culture and prices, operating costs for greenhouses, heating system design, vendors and a list of other sources of information.

  5. Openability of tamperproof packaging

    NARCIS (Netherlands)

    Del Castillo C., A.; Wever, R.; Buijs, P.J.; Stevels, A.

    2007-01-01

    Communication, product protection and presentation are three key aspects in the world of packaging nowadays. Due to a retail landscape consisting of large stores, displaying packed products on the shelves in self-service environments, these aspects become increasingly important, not only for Fast

  6. Packaging LLW and ILW

    International Nuclear Information System (INIS)

    Flowers, R.H.; Owen, R.G.

    1991-01-01

    Low level waste (LLW) accounts for 70-80% by volume of all radioactive wastes produced by the nuclear industry. It has low specific activity, negligible actinide content and requires little, if any, shielding to protect workers. Volume reduction for LLW of high volume but low density may be achieved by incineration and compaction as appropriate, before packaging for disposal by near surface burial. Intermediate level waste (ILW) is treated and packed to convert it into a stable form to minimize any release of activity and make handling easier. The matrix chosen for immobilization, usually cement, polymers or bitumen, depends on the nature of the waste and the acceptance criteria of the disposal facility. The special case of LLW and ILW which will arise from reactor decommissioning is discussed. Packaging methods adopted by individual countries are reviewed. The range of costs involved for packaging ILW is indicated. There is no international consensus on the performance required from packaged waste to ensure its suitability both for interim storage and final disposal. (UK)

  7. Aquaculture Information Package

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, T.; Rafferty, K. [editors

    1998-01-01

    This package of information is intended to provide background to developers of geothermal aquaculture projects. The material is divided into eight sections and includes information on market and price information for typical species, aquaculture water quality issues, typical species culture information, pond heat loss calculations, an aquaculture glossary, regional and university aquaculture offices and state aquaculture permit requirements.

  8. CH Packaging Maintenance Manual

    International Nuclear Information System (INIS)

    Washington TRU Solutions

    2002-01-01

    This procedure provides instructions for performing inner containment vessel (ICV) and outer containment vessel (OCV) maintenance and periodic leakage rate testing on the following packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test. In addition, this procedure provides instructions for performing ICV and OCV structural pressure tests

  9. Printer Graphics Package

    Science.gov (United States)

    Blanchard, D. C.

    1986-01-01

    Printer Graphics Package (PGP) is tool for making two-dimensional symbolic plots on line printer. PGP created to support development of Heads-Up Display (HUD) simulation. Standard symbols defined with HUD in mind. Available symbols include circle, triangle, quadrangle, window, line, numbers, and text. Additional symbols easily added or built up from available symbols.

  10. Type B drum packages

    International Nuclear Information System (INIS)

    McCoy, J.C.

    1994-08-01

    The Type B drum packages (TBD) are conceptualized as a family of containers in which a single 208 L or 114 L (55 gal or 30 gal) drum containing Type B quantities of radioactive material (RAM) can be packaged for shipment. The TBD containers are being developed to fill a void in the packaging and transportation capabilities of the U.S. Department of Energy as no container packaging single drums of Type B RAM exists offering double containment. Several multiple-drum containers currently exist, as well as a number of shielded casks, but the size and weight of these containers present many operational challenges for single-drum shipments. As an alternative, the TBD containers will offer up to three shielded versions (light, medium, and heavy) and one unshielded version, each offering single or optional double containment for a single drum. To reduce operational complexity, all versions will share similar design and operational features where possible. The primary users of the TBD containers are envisioned to be any organization desiring to ship single drums of Type B RAM, such as laboratories, waste retrieval activities, emergency response teams, etc. Currently, the TBD conceptual design is being developed with the final design and analysis to be completed in 1995 to 1996. Testing and certification of the unshielded version are planned to be completed in 1996 to 1997 with production to begin in 1997 to 1998

  11. Waste disposal package

    Science.gov (United States)

    Smith, M.J.

    1985-06-19

    This is a claim for a waste disposal package including an inner or primary canister for containing hazardous and/or radioactive wastes. The primary canister is encapsulated by an outer or secondary barrier formed of a porous ceramic material to control ingress of water to the canister and the release rate of wastes upon breach on the canister. 4 figs.

  12. Photovoltaic procurement strategies: an assessment of supply issues

    Energy Technology Data Exchange (ETDEWEB)

    Posner, D.; Costello, D.

    1980-02-01

    This review report presents the results of an analysis of alternative approaches to the design of a federal photovoltaics procurement program. Advantages and disadvantages of large purchases at fixed prices and smaller purchases for testing and demonstrating the technology are presented. The objectives and possible impacts of these purchase programs on the photovoltaic industry are described. The reactions of the industry to alternative purchase programs were assessed using personal interviews with selected companies currently active in photovoltaics. The report begins with a review of the impacts of federal procurements on other innovations, including the electronics industry, and suggests the relation of these procurements to photovoltaics. The methodology for conducting the interviews is presented next. The results of the interviews are summarized into possible scenarios of future developments in the industry and into discussions of key issues in the design of a procurement program. An appendix on the current structure of the photovoltaic industry is provided.

  13. 41 CFR 105-72.506 - Procurement records.

    Science.gov (United States)

    2010-07-01

    ... EDUCATION, HOSPITALS, AND OTHER NON-PROFIT ORGANIZATIONS 72.50-Post-Award Requirements/Procurement Standards...) Justification for lack of competition when competitive bids or offers are not obtained, and (c) Basis for award cost or price. ...

  14. Procurement and Contracting, Transportation & Public Facilities, State of

    Science.gov (United States)

    Visiting Alaska State Employees Alaska Department of Transportation & Public Facilities header image Alaska Department of Transportation & Public Facilities / Procurement and Contracting Search DOT& pages Department of Transportation & Public Facilities PO Box 112500 3132 Channel Drive Juneau

  15. Sustainable Public Procurement: A Tool for Greening the Economy ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... power to influence market trends, and production conditions and requirements. ... -create a practical handbook and policy papers for policymakers on how ... and value of the Green Procurement Handbook and to demonstrate the multiplier ...

  16. Quality of Spousal Relationship on Procurement of Abortion in Peri ...

    African Journals Online (AJOL)

    Quality of Spousal Relationship on Procurement of Abortion in Peri-Urban Nigeria. ... Communication was the only dimension of relationship quality that showed significant association with history of induced ... AJOL African Journals Online.

  17. [Posthumous sperm procurement and use--ethical and legal dilemmas].

    Science.gov (United States)

    Crha, I; Dostál, J; Ventruba, P; Kudela, M; Záková, J

    2004-07-01

    To present a review of bioethical discussion and recommendations concerning posthumous sperm procurement and postmortem parenthood. Review article. Department of Obstetrics and Gynecology, Masaryk University, Brno, Department of Obstetrics and Gynecology, Palacky University, Olomouc. Literature search in Database of Abstracts of Reviews of the Evidence (DARE) and MEDLINEplus. Posthumous sperm procurement and cryopreservation must be performed within 36 hours after death. To established appropriate medical practice, it is important to consider all stakeholders in the decision-making process: the deceased, the requesting party, the child, the physician and the society. There are only few legislative measures concerning postmortem parenthood and posthumous sperm procurement. The essential elements for postmortem reproduction are: judicial order, ethics committee approval, bereavement period of at least 6 month before use. Posthumous sperm procurement is fraught with ethical and legal implications. All stakeholder should be considered. Society for reproductive medicine should prepare acceptable standard protocol.

  18. REPUTATIONAL CAPITAL OF POLITICAL ACTORS AS PUBLIC PROCUREMENT

    Directory of Open Access Journals (Sweden)

    A. E. Rudakova

    2015-01-01

    Full Text Available The author examines the reputational characteristics of the formation of political actors at the expense of the state budget, the specificity of the mechanism of implementation of government procurement and modern Russian practice.

  19. Lives and choices, give and take: Altruism and organ procurement.

    Science.gov (United States)

    Thornton, Vicky

    2017-01-01

    In 2015, Wales introduced a deemed consent: soft opt-out system for organ procurement in order to address the chronic shortage of organs for transplant. Early statistical evidence suggests that this has had a positive impact on cadaveric organ donation. Such a system for procurement has previously been dismissed by the Organ Donation Taskforce, who suggested that opting out could potentially undermine the concept of donated organs as gifts and this could then negatively impact the number of organs offered for transplant. Considerable weight was placed upon the need to retain the altruistic gift element associated with an opt-in system. This article will consider the role of altruism in an organ procurement policy. A broad utilitarian approach will be taken when putting forward the arguments in favour of adopting a weak altruism position in a soft opt-out system for procurement with a combined registry.

  20. Innovation and Public Procurement: Terminology, Concepts, and Applications

    DEFF Research Database (Denmark)

    Obwegeser, Nikolaus; Müller, Sune Dueholm

    2018-01-01

    as well as research gaps and opportunities for future research are identified. Based on analysis of existing research, the proposed framework provides an overview of state- of-the-art knowledge, a unified terminology, and a holistic understanding of innovation in public procurement. The framework is both...... review of the literature on innovation in public procurement. From categorizing publications based on innovation drivers, concepts, and research approaches, the emerging structure of the field is described and synthesized into a framework of innovation in public procurement. The proposed framework......The growing awareness of public procurement as an innovation policy tool has recently sparked the interest of both policy makers and researchers. While an increasing number of studies is being published every year, an overview of the field is missing. Researchers, practitioners, and policy makers...

  1. 77 FR 38775 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-06-29

    ... addition to Procurement List for production by the nonprofit agencies listed: Products NSN: 8415-MD-001..., Blend, Santa Fe, 6/16 oz Containers. NSN: 8950-01-E62-2187--Spice, Onion, Granulated, 6/18 oz Containers...

  2. 48 CFR 970.5223-2 - Affirmative procurement program.

    Science.gov (United States)

    2010-10-01

    ... for Management and Operating Contracts 970.5223-2 Affirmative procurement program. Link to an amendment published at 75 FR 57695, Sept. 22, 2010. As prescribed in 48 CFR (DEAR) 970.2304-2, insert the...

  3. 77 FR 62219 - Procurement List; Proposed Additions and Deletions

    Science.gov (United States)

    2012-10-12

    ... addition to the Procurement List for production by the nonprofit agencies listed: Services Service Type... Maritime, Columbus, OH. SKILCRAFT-Spartan Chemical Cleaners NSN: 7930-00-NIB-0597--Tb-Cide Quat RTU...

  4. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  5. Public procurement, governance and economic growth: some policy ...

    African Journals Online (AJOL)

    Public procurement, governance and economic growth: some policy ... Employing the Keynesian income-expenditure approach to measuring the Gross Domestic ... reduce wastage, enhance the effectiveness of government spending, ensure ...

  6. The role of specification in public procurement of innovation

    DEFF Research Database (Denmark)

    Rolfstam, Max

    A taken for granted assertion in the literature discussing how public procurement can be used as a way of stimulating innovation is that functional specification should be applied. Unlike technical specification, where the exact details of the item to be procured is defined, it is assumed that......, by specifying only the function or envisaged performance of the item to be procured, this would allow the submission of bids involving innovative technology and solutions previously unknown to the procurer. The starting point for the article is the perception that these views are commonly held assertions which...... have received limited systematic scholarly attention. The article therefore analyzes specification in relation to buying situations, as knowledge conversion, in terms of resource requirements in relation to different specification levels. The generic conclusion the paper arrives...

  7. Federal Procurement Standards Applied to School Food Services.

    Science.gov (United States)

    VanEgmond-Pannell, Dorothy

    1984-01-01

    Explains standards laid out in Federal Circular A-120 to ensure accountability, uniformity of standards, legal compliance, and efficiency in school food service procurement. Includes bidding and contract award procedures, contract compliance considerations, and cost-cutting methods. (MCG)

  8. A rational procedure for the selection of appropriate procurement ...

    African Journals Online (AJOL)

    Construction work is procured via a number of systems, such as being Open and ... routes for construction projects as a means to enhance the quality of management ... systems to decision-making procedures in the construction industry.

  9. Procurement in the Nuclear Industry, Quality, Safety and Decision Making

    International Nuclear Information System (INIS)

    Jakobsson, Marianne; Svenson, Ola; Salo, Ilkka

    2010-03-01

    The major purpose of the present study is partly to map and partly to make an analysis of the decision processes in the procurement routines in the nuclear industry in order to provide a basis for: 1. further development of safety inspections about procurements for Swedish Radiation Safety Authority 2. improvements of safety management in connection with procurement within a nuclear-power plant, 3 improvements of procurement routines in general in a nuclear power plant. The procurement processes at a nuclear power plant were analyzed from a decision theoretic perspective. Key staff at the plant was interviewed and written instructions as well as digitalized processes were used in the analysis. The results illustrate the most important moments during the procurement process with descriptions from interviews and documents. The staff at the nuclear power plant used a multi-attribute utility decision theory MAUT-inspired model in evaluation of alternatives and both compensatory (in which negative aspects can be compensated by positive aspects) and non-compensatory (in which certain 'pass' levels of attributes have to be exceeded for a choice) decision rules were used in the procurement process. Not surprising, nuclear safety was evaluated in a non-compensatory manner following regulatory criteria while costs were evaluated in trade-off compensatory rules, which means that a weakness in one consideration might be compensated by strength in another consideration. Thus, nuclear safety above the regulator's and law requirements are not integrated in a compensatory manner when procurement alternatives are evaluated. The nuclear plant assessed an organization's safety culture at an early stage of the purchasing process. A successful and a less successful procurement case were reported with the lessons learned from them. We find that the existing written instructions for purchase were well elaborated and adequate. There is a lack of personal resources when procurement teams

  10. CH Packaging Operations for High Wattage Waste at LANL

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal

  11. CH Packaging Operations for High Wattage Waste at LANL

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2003-01-01

    This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal

  12. CH Packaging Operations for High Wattage Waste at LANL

    International Nuclear Information System (INIS)

    Washington TRU Solutions LLC

    2002-01-01

    This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal

  13. Technology transfer package on seismic base isolation - Volume III

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-02-14

    This Technology Transfer Package provides some detailed information for the U.S. Department of Energy (DOE) and its contractors about seismic base isolation. Intended users of this three-volume package are DOE Design and Safety Engineers as well as DOE Facility Managers who are responsible for reducing the effects of natural phenomena hazards (NPH), specifically earthquakes, on their facilities. The package was developed as part of DOE's efforts to study and implement techniques for protecting lives and property from the effects of natural phenomena and to support the International Decade for Natural Disaster Reduction. Volume III contains supporting materials not included in Volumes I and II.

  14. Procurement Under The UNCITRAL Model Law: A Southern Africa Perspective

    OpenAIRE

    Stephen De La Harpe

    2015-01-01

    In Africa, economic integration, realised through regional integration, is seen as one of the driving factors that will improve the lives of its people. To enable regionalisation, economic growth and to unlock the potential of Africa its infrastructure will have to be improved. Infrastructure will on the whole be realised through public procurement. The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC i...

  15. Procurement Under The UNCITRAL Model Law: A Southern Africa Perspective

    Directory of Open Access Journals (Sweden)

    Stephen De La Harpe

    2015-12-01

    Full Text Available In Africa, economic integration, realised through regional integration, is seen as one of the driving factors that will improve the lives of its people. To enable regionalisation, economic growth and to unlock the potential of Africa its infrastructure will have to be improved. Infrastructure will on the whole be realised through public procurement. The stages for opening up procurement markets, referred to by Yukins and Schooner, is discussed and it is concluded that the states in SADC is still in the initial stages of opening its public procurement markets for regional competition. Although COMESA is not yet in full compliance with all four the stages great strides have been made and have elements of all stages been addressed. Because of the influence the Model Law has already played in COMESA, and the rest of Africa, it would be contra productive should SADC not take the same route as COMESA. If regard is had to the four categories of procurement rules that serves as barriers to national procurement markets, as set out by Arrowsmith it is clear that all of these are present in most SADC member states. Also in the case of COMESA these barriers still exist albeit to a lesser extent. What is necessary is a phased approach to address all of these barriers. This will be possible under the UNCITRAL Model Law as the 2011 Model Law does provide for the possibility of complying with international obligations and for states to allow for socio economic objectives in their procurement regimes. There can be little doubt that the 1994 Model Law has already had a marked influence on public procurement regulation in Africa and that the 2011 Model Law will in future continue to do so. Public procurement is essential for economic development and is the integration and harmonisation thereof on a regional basis the first step In this regard SADC, and especially South Africa, has an important role to play.

  16. Corruption and innovation in the Albanian public procurement system

    OpenAIRE

    Reida Kashta

    2014-01-01

    This paper examines the measures and means used to fight against corruption in public procurement in Albania. Because public procurement is one of the key areas where the public sector and the private sector interact financially and this interaction is based on public money, it is a prime candidate for corrupt activity, cronyism and favoritism as well as outright bribery. The question marks that this paper raises are: what are the means used in the war against corruption in the public ...

  17. The government procurement agreement: Implications of economic theory

    OpenAIRE

    Mattoo, Aaditya

    1996-01-01

    This paper analyzes the provisions of the new Agreement on Government Procurement (GPA), drawing insights from trade theory and recent developments in the economics of information and law. A central conclusion is that in a world where imperfectly informed procurers purchase from imperfectly competitive firms on behalf of imperfectly informed tax-payers, it is not easy to devise rules which would be optimal in all situations. Nevertheless, the non-discriminatory provisions of the GPA seem to a...

  18. Environmental criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    Fuentes Bargues, José Luis; González-Cruz, María-Carmen; González-Gaya, Cristina

    2017-01-01

    [EN] Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain g...

  19. Environmental Criteria in the Spanish Public Works Procurement Process

    OpenAIRE

    José Luis Fuentes-Bargues; Mª Carmen González-Cruz; Cristina González-Gaya

    2017-01-01

    Green Public Procurement (GPP) is defined as a process of contracting products, services, and works with the least possible damage to the environment during their life cycle. In order to improve the knowledge about GPP, a study of the use of environmental tendering criteria in the Spanish public construction sector has been performed. The results of this study show that the use of environmental criteria in Spanish public sector construction procurement is low in comparison to a certain group ...

  20. Procuring complex performance:case: public infrastructure projects

    OpenAIRE

    Leppänen, T. (Tero)

    2015-01-01

    Abstract This research studies procuring complex performance (PCP) in the case of public infrastructure projects. Focus of the research is on the interface between public clients and private sector contractors. Purpose of this research is to find out what are the main challenges of different project delivery methods according to literature (RQ1) and what are the practical challenges of public procurement (RQ2). As an end re...