  1. Operation safety at Ignalina NPP

    International Nuclear Information System (INIS)

    Zheltobriukh, G.

    1999-01-01

    An improvement of operational safety at Ignalina NPP covers: improvement of management structure and safety culture; symptom-based emergency operating procedures; staff training and full scope simulator; program of components ageing; metal inspection; improvement of fire safety. The first plan of Ignalina NPP Safety culture development for 1997 purposed to the SAR recommendation implementation was prepared and approved by the General Director

  2. Preparation for Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Medeliene, D.

    2004-01-01

    Latest developments of atomic energy in Lithuania, works done to prepare Ignalina NPP for final shutdown and decommissioning are described. Information on decommissioning program for Ignalina NPP unit 1, decommissioning method, stages and funding is presented. Other topics: radiation protection, radioactive waste management and disposal. Key facts related to nuclear energy in Lithuania are listed

  3. Shock absorber in Ignalina NPP

    International Nuclear Information System (INIS)

    Bulavas, A.; Muralis, J.

    1996-09-01

    Theoretical calculation and experimental analysis of models of shock absorber in Ignalina NPP is presented. The results obtained from the investigation with model of shock absorber coincide with the theoretical calculation. (author). 2 figs., 3 refs

  4. Emergency preparedness at Ignalina NPP

    International Nuclear Information System (INIS)

    Kairys, A.

    1998-01-01

    Brief review of Ignalina NPP safety upgrading and personnel preparedness to act in cases of accidents is presented. Though great activities are performed in enhancing the plant operation safety, the Ignalina NPP management pays a lot of attention to preparedness for emergency elimination and take measures to stop emergency spreading. A new Ignalina NPP emergency preparedness plan was drawn up and became operational. It is the main document to carry out organizational, technical, medical, evacuation and other activities to protect plant personnel, population, the plant and the environment from accident consequences. Great assistance was rendered by Swedish experts in drawing this new emergency preparedness plan. The plan consists of 3 parts: general part, operative part and appendixes. The plan is applied to the Ignalina NPP personnel, Special and Fire Brigade and also to other contractor organizations personnel carrying out works at Ignalina NPP. There are set the following emergency classes: incident, emergency situation, alert, local emergency, general emergency. Separate intervention level corresponds to each emergency class. Overview of personnel training to act in case of an emergency is also presented

  5. Ignalina NPP: living and working conditions

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The conference was devoted to discuss the social problems related with the operation of Ignalina NPP. The main topics are the following: analysis of public opinion of surrounding region of Ignalina NPP including neighbouring Daugavpils district in Latvia, environment impact evaluation of Daugavpils district, assessment of the influence of Ignalina NPP operation to the development of business in the region, investigation of problems of Visaginas town - residence of Ignalina NPP personnel. The specificity of Visaginas (former Sniechkus) is defined by the majority of non-native Lithuanians living there. Cultural transformation and political organization of the region were surveyed as well

  6. Licensing of the Ignalina NPP

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Since 1991 State Nuclear Power Safety Inspectorate (VATESI) has regulated Ignalina NPP operation by issuing annual operating permits. Those have been issued following submission of specified documents by the Ignalina NPP that have been reviewed by VATESI. However, according to to the procedures that are now established in the Law on Nuclear Energy and subordinate regulations the use of nuclear energy in the Republic of Lithuania is subject to strict licensing. Therefore a decision about the licence for continued operation of unit 1 should be taken. Licence would be granted by VATESI in cooperation with the Ministry of Health, Ministry of Environment and the institutions of local authorities. Ignalina NPP presented to the VATESI safety analysis report (SAR) with other documents. SAR was made mainly by foreign experts and financed by European Bank for Reconstruction and Development (EBRD). VATESI in this process is supported by western regulators. A special project LAP - Licensing Assistance Project was launched to help VATESI perform licensing according western practices

  7. Safety culture in Ignalina NPP, regulatory view

    Energy Technology Data Exchange (ETDEWEB)

    Maksimovas, G [VATESI (Lithuania)

    1997-09-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP.

  8. Safety culture in Ignalina NPP, regulatory view

    International Nuclear Information System (INIS)

    Maksimovas, G.

    1997-01-01

    The presentation describes how success on the way to a high level Safety Culture in Ignalina NPP may be achieved by daily, well motivated activities with good attitude and proper management participation, ensuring the development and proper implementation of Safety Culture principles within the activities of Operational organization of Ignalina NPP

  9. A brief overview of Ignalina NPP safety issues

    International Nuclear Information System (INIS)

    Almenas, K.; Ushpuras, E.

    1998-01-01

    A description of the safety of Ignalina NPP in a very popular form is presented. Answers to the most frequently recurring questions concerning the Ignalina NPP are provided based on recently completed international studies. Questions are like these: can a similar accident to the one that occurred in Chernobyl take place at Ignalina NPP, does the Ignalina NPP have a containment, what are the probabilities and potential consequences of accidents, etc. The brochure contains a short description of Ignalina NPP safety improvement programs

  10. Ignalina NPP Safety Analysis: Models and Results

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Research directions, linked to safety assessment of the Ignalina NPP, of the scientific safety analysis group are presented: Thermal-hydraulic analysis of accidents and operational transients; Thermal-hydraulic assessment of Ignalina NPP Accident Localization System and other compartments; Structural analysis of plant components, piping and other parts of Main Circulation Circuit; Assessment of RBMK-1500 reactor core and other. Models and main works carried out last year are described. (author)

  11. Safety Analysis Report for Ignalina NPP

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1997-01-01

    In December 1994 an agreement was signed between the European Bank for Reconstruction and Development and the Republic of Lithuania for the grant of 32.86 MECU for the safety Improvement at Ignalina NPP. One of the conditions for the provision of the grant, was a requirement for an in-depth analysis of the safety level at Ignalina NPP in the scope and according to the standards acceptable for a western nuclear power plant, and to publish a Safety Analysis Report (SAR). The report should investigate and analyze any factor that could limit a safe operation of the plant, and provide recommendations for actual safety improvements. According to the agreement, Lithuania had to finalize the SAR until 31 December, 1995. The bank has also organized and financed investigation of safety at Ignalina NPP and preparation of the SAR. EBRD made an agreement with Sweden's Vattenfall, which subcontracted well-known companies from Canada, USA, Germany, etc., and also the Russian Research and Development Institute of Power Engineering (NIKIET), reactor designer of Ignalina NPP. The SAR is a very comprehensive document and contains about 8000 pages of text, diagrams and tables. The main findings of the SAR are provided in the article. A large number of discrepancies with modern rules and western practices was detected, but they were not proved to be serious enough to require reactors shutdown. Based on the recommendations of the SAR Ignalina NPP has worked out Safety Improvement Program No. 2 (SIP-2), which is planned for three years and will cost 486 MLT. (author)

  12. Social consequences of closing the Ignalina NPP

    International Nuclear Information System (INIS)

    Baubinas, R.; Burneika, D.

    2001-01-01

    The possible social consequences of closing the Ignalina Nuclear Power Plant are studied. The social and economical situation in Visaginas and in the Utena region as a precondition for possible social consequences is shown. Also, two main groups of factors that can possibly influence the situation in the labour market are analysed. The problems of the enterprises that create working places and of the inhabitants of Visaginas whose possible behaviour can affect the situation in the labour market are discussed. Also, some proposals to neutralize the social costs of closing the Ignalina NPP are made. (author)

  13. Conference: Nuclear Safety at the Ignalina NPP - Achievements and Challenges

    International Nuclear Information System (INIS)

    1999-01-01

    Brief description of conference which took place in Vilnius on 8-9 April 1999 is presented. The aim of the international conference is to review the work carried out, to evaluate its influence on the nuclear safety, to get acquainted with the safety system of the Ignalina NPP. On December 31, the Ignalina NPP celebrated its 15 year anniversary. During that period the Ignalina NPP has produced more than 182 billion kWh of electricity. Nuclear power is not only immense economic benefit but also a syndrome of fear of an atomic bomb and the Chernobyl accident that has formed over the years. Numerous comprehensive international studies have been performed at the Ignalina NPP. After the Chernobyl accident many steps have been taken to improve the safety of the Ignalina NPP. The introduced changes guaranteed that the void coefficient remained negative in all possible circumstances. The Ignalina NPP is intensively preparing for licensing of unit 1

  14. Sociological investigations on Ignalina NPP and within its surroundings

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The purpose of this study was to determine the impact of Ignalina NPP and Visaginas town on the social territorial processes in the region and to reveal the impact of Ignalina NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological affect. According to the results of this research three quarters of the inhabitants and the functionaries of local administration hold an opinion that operation of Ignalina NPP posses threat for the population and environment. Meanwhile they are sure that danger of Ignalina NPP is not critical. 21 - 35 % of the local administrators speak for the closure of Ignalina NPP , whereas half of Visaginas residents and three quarters of the local administrators indicate that operation of reactors is expedient. Over 90% of the population do not have sufficient information on the operation of Ignalina NPP. In the opinion of the rest Lithuanian people Ignalina NPP zone is related with the physical danger and the image of Visaginas residents as the 'others', 'strangers'. More than 90% of Ignalina NPP employees are Russian speaking, not native Lithuanians. The social relations of Visaginas with the environment are poor as a result of the situation of the town, lack of communications and cultural self isolation. (author)

  15. Project No. 10 - Partial restoration of Ignalina NPP territory

    International Nuclear Information System (INIS)

    2000-01-01

    At present Ignalina NPP territory makes a total of 2544 ha of land. Due to termination of construction activity development and due to the decision taken to shutdown unit 1 the need in such a territory fell off. For normal and safe operation of Ignalina NPP 1440 ha is enough, including 1237 ha for of Ignalina NPP administrative area and 203 ha for auxiliary objects. Ignalina NPP will have to rearrange territory, forestry that was damaged during the construction activities of the plant and to restore the damaged farmlands and to pass the rearranged forestry that belonged to the Ignalina NPP to the Ministry of Forestry. The total estimated cost of the project is about 1.042 M EURO

  16. Characterization of Ignalina NPP RBMK Reactors Graphite

    International Nuclear Information System (INIS)

    Hacker, P.J.; Neighbour, G.B.; Levinskas, R.; Milcius, D.

    2001-01-01

    The paper concentrates on the investigations of the initial physical properties of graphite used in production of graphite bricks of Ignalina NPP. These graphite bricks are used as nuclear moderator and major core structural components. Graphite bulk density is calculated by mensuration, pore volumes are measured by investigation of helium gas penetration in graphite pore network, the Young's modulus is determined using an ultrasonic time of flight method, the coefficient of thermal expansion is determined using a Netzsch dilatometer 402C, the fractured and machined graphite surfaces are studied using SEM, impurities are investigated qualitatively by EDAX, the degree of graphitization of the material is tested using X-ray diffraction. (author)

  17. Lessons learnt from Ignalina NPP decommissioning project

    International Nuclear Information System (INIS)

    NAISSE, Jean-Claude

    2007-01-01

    The Ignalina Nuclear Power Plant (INPP) is located in Lithuania, 130 km north of Vilnius, and consists of two 1500 MWe RBMK type units, commissioned respectively in December 1983 and August 1987. On the 1. of May 2004, the Republic of Lithuania became a member of the European Union. With the protocol on the Ignalina Nuclear Power in Lithuania which is annexed to the Accession Treaty, the Contracting Parties have agreed: - On Lithuanian side, to commit closure of unit 1 of INPP before 2005 and of Unit 2 by 31 December 2009; - On European Union side, to provide adequate additional Community assistance to the efforts of Lithuania to decommission INPP. The paper is divided in two parts. The first part describes how, starting from this agreement, the project was launched and organized, what is its present status and which activities are planned to reach the final ambitious objective of a green field. To give a global picture, the content of the different projects that were defined and the licensing process will also be presented. In the second part, the paper will focus on the lessons learnt. It will explain the difficulties encountered to define the decommissioning strategy, considering both immediate or differed dismantling options and why the first option was finally selected. The paper will mention other challenges and problems that the different actors of the project faced and how they were managed and solved. The paper will be written by representatives of the Ignalina NPP and of the Project Management Unit. (author)

  18. Can the Ignalina NPP be safe?

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    Many countries started using nuclear power before Lithuania, the IAEA and NEA were established and have been functioning efficiently, numerous conventions have been signed that control nuclear activities, nuclear safety regulations and standards have been set. Lithuania which is striving to integrate into the West European structures and to become a member of the 'club' of the world's nuclear states, has become a full and equal member of the IAEA and recognises its recommendations. Furthermore, it has signed or joined international conventions and is doing its best to introduce the practice of controlling nuclear safety applied in western countries. Nuclear safety cannot be taken as something finite that does not change. The requirements of nuclear and radiation safety are continuously redefined taking into consideration scientific discoveries and inventions as well as technical progress. Safety assurance can be the only criterion that should determine whether the nuclear power plant can be operated in Lithuania. The safety analysis report confirmed that the Ignalina NPP can be safely operated until the channel-graphite gap closes. The experiments conducted to date have convincingly shown that by the year 2000 the gap will not close in any of the fuel channels of unit 1. It can be hoped that the submitted studies, analyses and assessments will confirm that the Ignalina NPP meets Lithuania's nuclear safety requirements that have been drawn up in compliance with the recommendations of IAEA

  19. Project No. 7 - Decommissioning unit at Ignalina NPP. (Engineering and project management)

    International Nuclear Information System (INIS)

    2000-01-01

    In order to manage decommissioning process at Ignalina NPP, a new unit should be established in the framework of the Ignalina NPP organizational structure. The on-site Engineering Project Management Unit (PMU) will adopt an integrated approach to project management , engineering design, planning, procurement, safety and licensing activities at Ignalina NPP site. The PMU will assist the Ignalina NPP management in the development of an integrated decommissioning and waste management strategy

  20. Challenges of Ignalina NPP Decommissioning - View of Lithuanian Operator

    International Nuclear Information System (INIS)

    Aksionov, P.

    2017-01-01

    The state enterprise Ignalina Nuclear Power Plant (INPP) operates 2 similar design units of RBMK-1500 water-cooled graphite-moderated channel-type power reactors (1500 MW electrical power). INPP is carrying out the decommissioning project of the 2 reactors which includes: -) the retrieval of the spent nuclear fuel from the power units and its transportation into the Interim Spent Fuel Storage Facility; -) equipment and building decontamination and dismantling; -) radioactive waste treatment and storage; and -) the operation of key systems to ensure nuclear, radiation and fire protection. Ignalina NPP decommissioning project is planned to be completed by 2038. The presentation will be focused on the ongoing decommissioning activities at Ignalina NPP. The overview of main aspects and challenges of INPP decommissioning will be provided

  1. Analysis of flooding possibilities of premises of Ignalina NPP

    International Nuclear Information System (INIS)

    1999-01-01

    Analysis of flooding possibilities of premises with safety related equipment of Ignalina NPP was performed. In calculations codes SQUIRT and RELAP5 was used. In most cases it was found that it would be enough time to take corrective measure in the case of flooding accident

  2. The Ignalina NPP and Y2K Problem

    International Nuclear Information System (INIS)

    Medeliene, D.

    2000-01-01

    Work on preparing the hardware and software of the Ignalina NPP for the year 2000 was started in December 1998. First of all, a Y2K project team was formed comprising 29 specialists. Some of these are the most experienced computer specialist, others co-ordinate work on the Y2K problem at the divisions of the NPP using computers or microprocessors. The project head was appointed and the schedule of work confirmed. In accordance with the schedule, the work was divided into twelve stages. The results showed that the preparations were adequate. On the New Year night the specialists of the Ignalina NPP Emergency Operation Centre worked together with the managers of the plant. Relation with other Lithuanian and international organisations was established. No any Y2K related event happened

  3. The final report of the state scientific programme 'Ignalina NPP and the Environment'

    International Nuclear Information System (INIS)

    1998-03-01

    The final report of the State Scientific Programme 'Ignalina NPP and the Environment' includes the generalised research material on the after effects of Ignalina NPP operation upon natural environment and social processes. The data on changes of thermal state and water balance of lake Drukshiai; the effect of permanent thermal and chemical pollution on the water chemical composition and hydrochemical regime; the geochemical - contaminated state; the condition, dynamics and changes of hydrobiont communities in lake Drukshiai; the bio indication of ecological effects; the toxic and genotoxic influence of Ignalina NPP waste waters and lake Drukshiai water as well as bottom sediments; the state and dynamic of landscape ecosystem components of Ignalina NPP region; the radionuclides in Ignalina NPP area, the medical and biological studies in the Ignalina NPP influence population zone; the impact of Ignalina NPP on social territorial processes in the region are presented. Radioecological and ecotoxilogical state of Ignalina NPP region and lake Drukshiai is estimated as well as changes in lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic of the plant influence are elucidated. The final report contains the results of final report by the executors of the tasks and themes of the Programme which have been obtained since the beginning of the implementation of the Programme as well as generalising conclusions and recommendations. (author)

  4. Safety analysis of Ignalina NPP during shutdown conditions

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.

    2000-01-01

    The accident analysis for the Ignalina NPP with RBMK-1500 reactors at normal operating conditions and at minimum controlled power level (during startup of the reactor) has been performed in the frame of the project I n-Depth Safety Assessment of the Ignalina NPP , which was completed in 1996. However, the plant conditions during the reactor shutdown differ from conditions during reactor operation at full power (equipment status in protection systems, set points for actuation of safety and protection systems, etc.). Results of RELAP5 simulation of two worst initiating events during reactor shutdown - Pressure Header rupture in case of steam reactor cooldown as well as Pressure Header rupture in case of water reactor cooldown are discussed in the paper. Results of analysis shown that reactor are reliably cooled in both cases. Further analysis for all range of initial events during reactor shutdown and at shutdown conditions is recommended. (author)

  5. The enhancement of Ignalina NPP in design and operational safety

    International Nuclear Information System (INIS)

    Negrivoda, G.

    1999-01-01

    Enhancement of Ignalina NPP design include: core design improvements; fuel channel integrity (multiple pressure tube rupture); improvements of shutdown systems; improvements of instrumentation and control devices; containment strength and tightness; design basis accident analysis; improvements of safety and support systems; seismic safety enhancement; Year 2000 project; cracks in pipes. Enhancement of operational safety includes: quality assurance; configuration management; safety management and safety culture; emergency operating procedures; training and full scope simulator; in-service inspection; fire protection and ageing monitoring and management

  6. Preparation for Early Termination of Ignalina NPP Operation

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.

    2003-01-01

    Seimas (Parliament of Lithuania) approved updated National Energy strategy where it is indicated that first Unit will be shutdown before the year 2005 and second Unit in 2009 if funding for decommissioning is available from EU and other donors. In accordance to Ignalina NPP Unit 1 Closure Law the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until year 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, o n the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned activities, licensing requirements for decommissioning, progress in preparation of the Final Decommissioning Plan is discussed

  7. Probabilistic safety assessment activities at Ignalina NPP

    International Nuclear Information System (INIS)

    Bagdonas, A.

    1999-01-01

    The Barselina Project was initiated in the summer 1991. The project was a multilateral co-operation between Lithuania, Russia and Sweden up until phase 3, and phase 4 has been performed as a bilateral between Lithuania and Sweden. The long-range objective is to establish common perspectives and unified bases for assessment of severe accident risks and needs for remedial measures for the RBMK reactors. During phase 3, from 1993 to 1994, a full scope Probabilistic Safety Analysis (PSA) model of the Ignalina Nuclear Power Plant unit 2 was developed to identify possible safety improvement of risk importance. The probabilistic methodology was applied on a plant specific basis for a channel type reactor of RBMK design. During phase 4, from 1994 to 1996, the PSA was further developed, taking into account plant changes, improved modelling methods and extended plant information concerning dependencies (area events, dynamic effects, electrical and signal dependencies). The model reflected the plant status before the outage 1996. During phase 4+, 1998 to 1999 the PSA model was upgraded taking into account the newest plant modifications. The new PSA model of CPS/AZRT was developed. Modelling was based on the Single Failure Analysis

  8. Tendencies of ecological changes in the region of Ignalina NPP and in Lake Drukshiai

    International Nuclear Information System (INIS)

    Pashkauskas, R.; Mazeika, J.; Baubinas, R.

    1999-01-01

    Since 1979, when the construction of the Ignalina Nuclear Power Plant started, a group of specialists from Lithuania research and academic institutions began to investigate both Lake Drukshiai - the cooler of the Ignalina NPP and the neighbouring area. The investigations were aimed not only at monitoring the environmental consequences of the Ignalina NPP impact but also at forecasting changes of the ecosystems. The State Scientific Program 'Ignalina Nuclear Power Plant and the Environment' was the result of final stage of complex investigations. This conference paper contains data on the changes of thermal state and water balance of Lake Drukshiai, the effect of permanent thermal and chemical pollution on the chemical composition and hydrochemical regime, the pollution of the lake water, the geochemical-contaminated state, the condition, dynamics and the changes of hydrobiont communities in Lake Drukshiai. Radioecological and eco toxicological state of Ignalina NPP region and Lake Drukshiai is estimated as well as changes in Lake Drukshiai and Ignalina NPP surrounding area ecosystems under the combine anthropogenic impact of the plant influence are elucidated. The findings on medical and biological studies in the Ignalina NPP influence population zone and the evidence of impact of Ignalina NPP on social-territorial processes in the region are presented as well

  9. Ecological and environmental education in the region of Ignalina NPP

    International Nuclear Information System (INIS)

    Motiejuniene, E.; Salickaite-Bunikiene, L.

    1995-01-01

    During three last years the groups involving pupils, students and teachers take part in the educational sessions. They are organized in Drukshiai Ecological Station . The work of Ignalina NPP, its influence on the nature as well as methods and results of scientific investigation and assessment of the influence are discussed. To direct environmental research activity of scholars the special 3-8 days programs made up by researchers are used. They include theoretical and practical studies. Educational - research activity performed in the Drukshiai Ecological Station could be an example of ecological schooling center related to environmental protection. (author). 2 refs

  10. Maintenance optimization of the Ignalina NPP safety systems

    International Nuclear Information System (INIS)

    Zuokas, D.; Augutis, J.

    2000-01-01

    This paper represents some theses and mathematical approach to optimization of technical specification problems of the diesel generators system (DGS) at the Ignalina NPP (INPP) in Lithuania. Analysis unites three chapters, each attributed to the solving of related problems: dependency of the Core Damage Frequency (CDF) on DGS test interval (Chapter 2), analysis and comparison of two different maintenance strategies for DGS (Chapter 3), DGS test interval's optimisation (averaged loss function minimisation) taking into consideration maintenance and DGS failure's consequence costs (Chapter 4). The mathematical model was developed which lets to estimate DGS failure probability, the averaged loss function value and study the influence of different parameters into final results. (author)

  11. Multimedia system for the visitors' centre at the Ignalina NPP

    International Nuclear Information System (INIS)

    Alvers, Margareta

    1999-01-01

    The contents illustrated with video clips, animations, photographs, show the follwing: History of Ignalina NPP (INPP) growing; Visaginas - how the town came into being; Lake Druksiai; Development of nuclear power; Technical data of INPP; Description of INPP; Characteristic features of RBMK reactors; Reactor design; Technical parametres of RBMK-1500 reactor; Nuclear reaction and nuclear fission; Types of nuclear reactors; Circuits and systems; Radiation safety; Safety systems at the INPP; Upgrading nuclear safety at INPP following the Chernobyl accident; Safety problems at MP; Radioactive waste management in the world; RW Management at MP; Energy in Lithuania (thermal power stations, cogeneration plants, producing biogas from organic waste)

  12. Evaluation of the atmospheric transport modeling tools used at the Ignalina NPP

    International Nuclear Information System (INIS)

    Jasiulionis, R.

    2004-01-01

    The atmospheric transport modeling system at the Ignalina NPP is part of the radionuclide monitoring system and is designed to help associate radionuclide network signals with possible source regions. The evaluation of the Atmospheric Transport Modeling Tools Used at the Ignalina NPP was based on results published in last years. The model based on semi-empirical formulae of turbulent diffusion in the air and local meteorological data were used for calculation of concentration of radionuclides emitted through the Ignalina NPP stack. Meteorological data (wind velocity and direction as well as temperature at a height of 2 and 30 meters) were obtained from the meteorological station of the Ignalina NPP at Visaginas. Using the Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model, trajectories of air masses transport to the Ignalina NPP region (56.55 N, 26.57 E) during 95 hours at heights of 100, 500 and 1000 m were calculated. The dispersion in the ground-level air of emissions through the Ignalina NPP stack can also be calculated using the HYSPLIT model. The data on the radionuclide activity concentrations in the air at the measurements site and results of calculation can used for the establishment of their field in the Ignalina NPP region. (author)

  13. The safety of Ignalina NPP and ecological danger in public opinion of inhabitants of Daugavpils region

    International Nuclear Information System (INIS)

    Peipinia, O.

    1998-01-01

    Inquest of Daugavpils' region pointed to a big anxiety for ecological danger of Ignalina NPP by inhabitants and experts. Absolute majority of respondents (73-78% inhabitants and 68-82% experts) apprehend the NPP as very dangerous and dangerous. More than half of respondents apprehend the dangerous increased during last two-three years. It is because no one has a good reference about situation, because tragic al Chernobyl NPP burst was on. The anxiety increases if the respondent lives nearer of NPP. Inhabitants of Daugavpils and it's region wants the better reference about situation, about future of Ignalina NPP after 2010 year, about securities means in case of NPP burst. (author)

  14. Investigation of toxic influence of Ignalina NPP waste water on Spirodela polyrrhiza culture

    International Nuclear Information System (INIS)

    Lakachauskiene, R.; Marchiulioniene, D.

    1995-01-01

    The influence of Ignalina NPP waste waters and of water taken in different biotop of lake Drukshiai on Spirodela polyrrhiza culture (growth intensity, biomass and morphological changes) was investigated. It was revealed that most polluted waters formed by Ignalina NPP outcomes were from industrial - rain sewerage and economic - domestic waste waters. Toxicity of all investigated waters was higher in autumn (October) than it was in spring (March -April). Comparative analysis of the data obtained in 1992-1994 indicated the growing tendency of toxicity in Ignalina NPP waste waters as well as lake Drukshiai water. (author). 5 refs., 4 figs

  15. The problem of gas gap between graphite - fuel channel reduction impact at Ignalina NPP

    International Nuclear Information System (INIS)

    1999-01-01

    Safety analysis of Ignalina NPP operation in the case when gap closure between graphite - fuel channel occur was performed. The main results of this analysis as well as data of gap measurements during the year 1996 - 1998 are provided

  16. Sr 90 in lake Drukshiai hydroecosystem - cooling basin of Ignalina NPP

    International Nuclear Information System (INIS)

    Dushauskene-Duzh, R.F.

    2002-01-01

    The main aim of these investigations were to investigate Sr 90 migration in lake Drukshiai hydroecosystem and determine factors stipulating the specific character of Sr 90 biological migration under the chemical and thermal pollution before and after Ignalina NPP acting

  17. Ignalina Nuclear Power Plant

    CERN Document Server

    2002-01-01

    Description of RPC inspections conducted at Ignalina NPP and enterprises sending their workers to work at Ignalina NPP is provided. Data on distribution of doses of Ignalina NPP workers and outside workers during 2002 are analysed. Statistical data on evolution of collective doses of Ignalina NPP and outside workers during 1995-2002 are provided.

  18. The impact of the Ignalina NPP and Visaginas town on the economy of the region

    International Nuclear Information System (INIS)

    Brazhukiene, I.; Krauchiunas, E.; Burneika, D.

    1998-01-01

    The present article is devoted to the influence of Visaginas town and Ignalina NPP on economy in the surrounding region. Preliminary the region includes the Ignalina and Zarasai administrative districts. However, these boundaries are relative. The analysis of the influence of Visaginas town and Ignalina NPP on the economy in the region revealed that such an influence exists, however, it is not as distinct as could have been expected from the town of such size. The influence on economy of the region includes influence on markets of economic resources (labour force and real estate markets were analyzed), influence on consumption market, influence on industries and services (the appearance of new manufacturing enterprises in the town itself, where, excluding the NPP, the economic sector is rather poorly developed, and the impact of the town on the enterprises of considered region were analyzed) and the influence on conditions for investment in the region. After the building Ignalina NPP and Visaginas the distribution of surrounding forests into protective categories has changed. The Ignalina NPP and Visaginas directly posses 1250 ha of forests. The influence of the town and Ignalina NPP on the enterprises of industry of considered region is important because Visaginas serving as a good market for various manufacturing enterprises makes it possible for them to maintain a certain economic level and have better profits. This aspect is extremely important for food and light industries. The extraction and building industry as well as many other branches of industries were most highly influenced during the building works of NPP. At present the building works meet only the current requirements of NPP and so they are not very intensive. The influence on consumption markets is more noticeable. With the building of Visaginas town consumption market of the region increased more than three times. The demand in the region increased as well as supply. The incomes of people in the

  19. Annual activity report of Ignalina NPP Safety Analysis Group for 1996 year

    International Nuclear Information System (INIS)

    Ushpuras, E.; Augutis, J.; Bubelis, E.

    1997-03-01

    The main results of Ignalina NPP Safety Analysis Group (ISAG) investigations for 1996 are presented. ISAG is concentrating its research activities into four areas: the neutrons dynamics modelling, simulation of transient processes during loss of coolant accident, the reactor cooling systems modelling and the probabilistic safety assessment of accident confinement system. Ignalina Safety Analysis Report was prepared on the basis of these results. 37 refs., 9 tabs., 96 figs

  20. Assistance of Foreign Countries and International Organizations to Support Safety Improvements at Ignalina NPP

    International Nuclear Information System (INIS)

    Shevaldin, V.

    1997-01-01

    International cooperation and assistance for the improving safety of Ignalina NPP is described. Sweden was among the first countries which supported safety improvements at Ignalina NPP. The first project in the cooperation was BARSELINA, Probabilistic Safety Analysis of Ignalina NPP. The cooperation is still bringing significant support to the plant, including improvements in the fire protection, communications system, physical protection, and many other areas. Another one very important source of assistance was Nuclear Safety Account, administered by the EBRD. In 1993 experts of the plant, together with representatives of VATESI and SKI (Sweden) have worked out a short-term safety improvement program SIP-1, which was financed by the EBRD . Eighteen safety related projects were selected, expensive and reliable equipment was procured and installed

  1. Results on improved environmental monitoring at the Ignalina NPP site

    International Nuclear Information System (INIS)

    Gudelis, A.; Remeikis, V.; Gubachev, I.; Batalin, J.

    2002-01-01

    Within the IAEA TC Project 'Radioecology in the vicinity of the Ignalina NPP' (LIT/9/003) a high efficiency HPGe well-type detector was obtained in 1998 for the investigations in environmental radioactivity in Lithuania. Efficiency calibration for this detector was done in the energy range 122-1461 keV by using reference standard solution with single-photon emitting radionuclides. At the same time, the coincidence-summing correction factor was experimentally determined for 60 Co. Earlier investigations carried out in moss samples in 1996 have shown that the site-specific radionuclide 60 Co was distributed on the ground mainly in the area of radius of 5-7 km from the source, and the maximum activity concentration on the earth surface was found to be 22 Bq/m 2 . However, only natural 7 Be and globally distributed 137 Cs were permanently measured in aerosol filter samples taken at 7 Ignalina NPP (INPP) monitoring stations, before the introduction of efficient HPGe well-type detector. Normally, the aerosol filters have been pressed into tablets and counted on the end cap of the Ge(Li)-detector that had relatively high MDA value (of the order of 0.5 Bq per sample for 137 Cs). It was, therefore, expected that the use of 4π geometry attainable inside a well would considerably improve the detection probability for 60 Co and other artificial radionuclides of the INPP origin. In order to prepare the aerosol filter samples for counting in new geometry they had to be ashed at 450 deg C. The final volume of ash samples was close to 2 cm 3 , and this amount could be easily fit into well that could accommodate samples of up to 4 cm 3 . For this geometry, the MDA values for 60 Co and 137 Cs were determined as 20 mBq and 12 mBq, respectively, when counting time was set to 100,000 s. After the remeasuring the aerosol filter samples in high-efficiency geometry a number of samples revealed the content of activation products 54 Mn and 60 Co that were not detected when Ge

  2. Benchmark analysis of three main circulation pump sequential trip event at Ignalina NPP

    International Nuclear Information System (INIS)

    Uspuras, E.; Kaliatka, A.; Urbonas, R.

    2001-01-01

    The Ignalina Nuclear Power Plant is a twin-unit with two RBMK-1500 reactors. The primary circuit consists of two symmetrical loops. Eight Main Circulation Pumps (MCPs) at the Ignalina NPP are employed for the coolant water forced circulation through the reactor core. The MCPs are joined in groups of four pumps for each loop (three for normal operation and one on standby). This paper presents the benchmark analysis of three main circulation pump sequential trip event at RBMK-1500 using RELAP5 code. During this event all three MCPs in one circulation loop at Unit 2 Ignalina NPP were tripped one after another, because of inadvertent activation of the fire protection system. The comparison of calculated and measured parameters led us to establish realistic thermal hydraulic characteristics of different main circulation circuit components and to verify the model of drum separators pressure and water level controllers.(author)

  3. Generalization of Nuclear Safety and Course of Accident Events Research in the Ignalina NPP

    International Nuclear Information System (INIS)

    Kaliatka, A.; Uspuras, E.

    2001-01-01

    The safety analysis shown that after implementation of SAR recommendations Ignalina NPP is adequately protected against accidents which required fast initiation of automatic protections. In case of accidents with long-term loss of core cooling additional operator actions are required. Accident management in case long-term core cooling are analyzed in this paper. (author)

  4. Annual activity report of Ignalina NPP Safety Analysis Group for 1995 year

    International Nuclear Information System (INIS)

    Ushpuras, E.; Augutis, J.; Bubelis, E.

    1995-01-01

    The main results of Ignalina NPP Safety Analysis Group (ISAG) investigations for 1995 are presented. ISAG is concentrating its research activities into four areas: the neutrons dynamics modelling, simulation of transient processes during loss of coolant accident, the reactor cooling systems modelling and the probabilistic safety assessment of accident confinement system. 18 refs., 9 tabs., 110 figs

  5. Annual activity report of Ignalina NPP Safety Analysis Group for 1994 year

    International Nuclear Information System (INIS)

    Ushpuras, E.; Kaliatka, A.; Chesna, B.; Dundulis, G.

    1995-01-01

    The main results of Ignalina NPP Safety Analysis Group (ISAG) investigations for 1994 are presented. ISAG is concentrated its research activities into 3 areas: the neutrons dynamics modeling, simulation of transient processes during loss of coolant accident and calculation of reactor building structure's streses and other mechanical properties in the case of accident. 6 refs., 13 tabs., 69 figs

  6. Annual activity report of Ignalina NPP Safety Analysis Group for the year 1997

    International Nuclear Information System (INIS)

    Ushpuras, E.; Augutis, J.; Bubelis, E.; Kaliatka, A

    1998-01-01

    The main results of Ignalina NPP Safety Analysis Group (ISAG) investigations for the year 1997 are presented. ISAG is concentrating its research activities into four areas: the neutrons dynamics modelling, simulation of transient processes during loss of coolant accident, the reactor cooling systems modelling and the probabilistic safety assessment of accident confinement system

  7. Inter granular stress corrosion cracking of Ignalina NPP austenitic piping of outside diameter 325 mm

    International Nuclear Information System (INIS)

    Nedzinskas, L.; Klimasauskas, A.

    2003-01-01

    The Inter Granular Stress Corrosion Cracking (IGSCC) of Ignalina NPP main circulation circuit piping, produced from austenitic stainless steel is presented covering current performances and further 'Ageing Management' related actions and plans as well as experience (lessons learned) on solving IGSCC phenomenon, which is currently under investigations and no yet comprehensive answer how to avoid it. (author)

  8. The standpoint of the society to the functioning, prospects and influence upon the people and environment of the Ignalina NPP

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The article presents the results of the sociological research in the districts of Ignalina, Shvenchionys, Utena, Zarasai and in the city of Visaginas, the attitudes of administration towards the functioning of Ignalina NPP, prospects and influence upon the people and environment. The explanation of the danger sources, the limits of fear, and the influence upon the social economic development of region is given. (author)

  9. Fission product source from Ignalina NPP in case of loss-of-coolant accidents

    International Nuclear Information System (INIS)

    Ubonavicius, E.; Rimkevicius, S.

    2001-01-01

    The release of radioactive materials to the environment is of special importance in the case of any accident at Nuclear Power Plants (NPP). The integrated analysis of thermal-hydraulic parameters behavior and radioactive fission products (FP) transport and deposition in the compartments play an important role in the evaluation of FP release to the environment and determines the irradiation dozes of personnel and public. In this report the transport and the deposition of radioactive material in the Ignalina NPP unit 1 compartments as well as the FP source term to the environment in the case of design basis loss-of-coolant accidents are discussed. The calculation models for the evaluation of FP transport and deposition as well as the results of performed calculations of several accidents at Ignalina NPP are presented. (author)

  10. Investigation of landscape and its components in the Ignalina NPP region

    International Nuclear Information System (INIS)

    Masiliunas, L.; Eitmanavichiene, N.

    1995-01-01

    The landscapes were distinguished in the Ignalina NPP (the basin of Lake Drukshiai) region: 1 - landscape with large hills, kettles and lakes; morainic-loamy; 2 - with small hills, kettles, lakes; morainic-loamy; 3 -waved, boggy, fliuvioglacial sandy plain. Heavy metals and radionuclides are least stable in landscapes with fliuvioglacial sand and gravel deposits. Meanwhile, in bogs (especially raised ones) metals and radionuclides most intensively accumulate and, the least amount of them get into other structures of landscape and Lake Drukshiai. As migration conditions of radionuclides, landscape resistivity to radionuclide load and regulation means of this resistivity are characterized by a territorial way of spreading and can be reflected on maps. This would be a radioecological map of Ignalina NPP and Lake Drukshiai basin with the planned measures of nature protection and economic use. (author). 3 refs., 3 figs

  11. Technical support to the social cost study of Ignalina NPP decommissioning

    International Nuclear Information System (INIS)

    Vitkiene, E.

    2001-01-01

    Description of Phare project on assessment of social cost related with decommissioning of unit 1 of Ignalina NPP is presented. This is the first project of social guarantees in Visaginas financed by European Commission Project will develop pilot studies aimed at encouraging small and medium size business in Visaginas, creating new jobs, employment of young people. The project will also consult about the activities of the said projects, inform the community about the things being done to mitigate social impact

  12. Informing the Lithuanian public about the decommissioning of Unit 1 at Ignalina NPP

    International Nuclear Information System (INIS)

    Medeliene, D.; Alvers, M.

    2001-01-01

    The final decision about decommissioning of Unit 1 at Ignalina NPP by 2005 was taken when the Lithuanian Parliament approved the National Energy Strategy in 1999. In 2000 the Board of the European Bank of Research and Development (EBRD) approved the establishment of the Ignalina International Decommissioning Support Fund and the International Donors' Conference took place in Vilnius. Sweden's longterm co-operation with Lithuania in the area of nuclear safety started already in 1992, soon after the country had regained its independence. SIP (Swedish International Project Nuclear Safety) administers this bilateral assistance. Public information has been included in the Swedish programme since the establishment of the Information Centre at INPP and is also a part of the bilateral decommissioning support. SIP finances a series of TV-programmes on a national channel and the local cable TV in Visaginas (the town close to Ignalina NPP) about various aspects of decommissioning. The Lithuanian regulatory authority VATESI uses its experience in public relations to inform about the situation related with decommissioning. The authority organizes 'Open Doors' days and press conferences to provide objective and trustworthy information. The reaction of the viewers to the TV-programmes were very positive and Sweden will continue the support to the information programme in Lithuania. (author)

  13. Engineering Geological Conditions of the Ignalina NPP Region

    International Nuclear Information System (INIS)

    Buceviciute, S.

    1996-01-01

    During engineering geological mapping, the upper part (to 15-20 m depths) of the lithosphere was investigated at the Ignalina Nuclear Power Plant (INPP) for physical rock characteristics and recent exogenic geological processes and phenomena. The final result of engineering geological mapping was the division of the area into engineering geological regions. In this case five engineering geological regions have been distinguished. The Fig. shows a scheme of engineering geological regionalization of the area and the typical sections of the engineering geological regions. The sections show genesis, age, soil type, thickness of stratigraphic genetical complex for the rocks occurring in the zone of active effect of engineering buildings, as well as the conical strength and density of the distinguished soils. 1 fig., 1 tab

  14. Safety assessment and improvement of Ignalina NPP against downcomer ruptures outside Accident Localisation System

    International Nuclear Information System (INIS)

    Rimkevicius, S.; Urbonavicius, E.

    2002-01-01

    Accident Localisation System (ALS) of Ignalina NPP is a pressure suppression type confinement, designed to prevent the release of contaminated steam-water mixture to the environment in case of Loss-of-Coolant Accident (LOCA). One of the peculiarities of Ignalina NPP with RBMK-1500 reactors is that not all of the reactor coolant circuit is enclosed within ALS. Some part of downcomers, that connect Drum Separator (DS) and suction header of main circulation pump is located outside ALS. In case of downcomer rupture in DS compartment the discharge is not confined, but flows to the environment through the safety panels installed in the ceiling of DS compartments. Numerous safety analyses were performed to assess the safety of Ignalina NPP against downcomer break outside ALS, and results were used for different applications in order to improve the safety of the plant. This paper presents the overview of the performed analyses, recommendations raised and safety improvements made to enhance the safety level of NPP. One of the applications is to present the recommendations for safety improvement if maximal allowable pressure limits are exceeded. The calculations results demonstrate that in the case of two downcomers rupture in drum separators compartment the maximum permissible pressure in the reactor hall could be exceeded. The knock-out panels from the reactor hall to the environment were recommended and installed for reactor hall overpressure protection. The evaluation of the drainage system efficiency from DS compartments was performed. In this case the especial attention was paid to analyse the water collection and drainage system behaviour in long term after postulated breaks. The analysis results showed that the modernization of the drainage system prevents the accumulation of the released water in the compartments even in the case of two downcomer pipes ruptures, and decreases the release of radioactive fission products (FP) to the environment.(author)

  15. Calculation of the effectiveness of manual control rods for the reactor of Ignalina NPP Unit 2

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.

    2001-01-01

    On the basis of one of the recent databases of the reactor of Ignalina NPP Unit 2, calculations of the effectiveness of separate manual control rods, groups of manual control rods and axial characteristic of effectiveness of separate manual control rods were performed. The results of the calculations indicated, that all analyzed separate manual control rods have approximately the same effectiveness, which doesn't depend on the location of a control rod in the reactor core layout Manual control rod of the new design has about 10% greater effectiveness than manual control rod of the old design. (author)

  16. Evaluation of Ignalina NPP waste waters toxicity by use of biotest complex

    International Nuclear Information System (INIS)

    Marchiulioniene, D.

    1995-01-01

    The impact of lake Drukshiai various biotop waters and bottom sediments on test-organisms Tradescantia higher plants, as well as trout Salmo gairdneri spawn and larvae was investigated in 1988 - 1994. It was determined that toxic matters, heavy metals and radionuclides among them, discharge into lake Drukshiai with Ignalina NPP waste waters. They accumulate in components of ecosystem, especially in bottom sediments. The gradual increase of toxic impact caused by water and bottom sediments is observed in the investigated lake biotops. The highest toxity levels were in 1993. Maximal toxity is caused by chemical matters. (author). 11 refs., 4 tabs., 3 figs

  17. The functional role of microorganisms in soil biocenoses in Ignalina NPP region

    International Nuclear Information System (INIS)

    Bagdanavichiene, Z.; Budavichiene, I.; Ramanauskiene, Z.

    1995-01-01

    Studies on group structure of soil microorganisms as well as regularities of changes in cellulotic activity in marsh biotopes of pine and birch forests in the littoral district of lake Drukshiai were carried out. The activity and directness of microorganisms, as well as dissociation rate of cellulose in soil depending on the changes of climatic conditions were evaluated. The effect of climate factors and thermal pollution on the activity of microorganisms and rate of cellulose degradation in soil was revealed in the standard area (Shashkai) near the disposal canal of Ignalina NPP. (author). 11 refs., 2 tabs., 3 figs

  18. External Costs Associated with Electricity Generation in Lithuania: Impact of Ignalina NPP Closure

    International Nuclear Information System (INIS)

    Streimikiene, D.

    2000-01-01

    Sustainability and development have been founded on continuing growth in energy demand and distribution, and management of natural resources through proper allocation and efficiency. It is clear that the use of energy in all its forms and applications provides an enormous benefit to society. However, it is also associated with numerous environmental and social challenges, such as, e.g., the health effects of air pollution. These burdens are referred to as external costs, as they have not been included in the market price of energy. The purpose of externalities research is to quantify damages in order to allow rational decisions to be made that weigh the benefits of actions to reduce externalities against the costs of doing so. Ultimately, market failure could be reduced by internalization of the external costs during energy planning. The paper deals with the problems of external costs associated with electricity generation in Lithuania and evaluates the environmental impact related to increased atmospheric pollution when the first unit at Ignalina NPP will be closed in 2005. Simplified methodology for the evaluation of external costs based on Impact Pathway Approach developed by International Atomic Energy Agency was applied. Achieved results indicate that due to the increased atmospheric pollution the external costs associated with electricity generation in the case of the first unit closure at Ignalina NPP would amount to 130 million USD. (author)

  19. Sensitivity and uncertainty analysis for Ignalina NPP confinement in case of loss of coolant accident

    International Nuclear Information System (INIS)

    Urbonavicius, E.; Babilas, E.; Rimkevicius, S.

    2003-01-01

    At present the best-estimate approach in the safety analysis of nuclear power plants is widely used around the world. The application of such approach requires to estimate the uncertainty of the calculated results. Various methodologies are applied in order to determine the uncertainty with the required accuracy. One of them is the statistical methodology developed at GRS mbH in Germany and integrated into the SUSA tool, which was applied for the sensitivity and uncertainty analysis of the thermal-hydraulic parameters inside the confinement (Accident Localisation System) of Ignalina NPP with RBMK-1500 reactor in case of Maximum Design Basis Accident (break of 900 mm diameter pipe). Several parameters that could potentially influence the calculated results were selected for the analysis. A set of input data with different initial values of the selected parameters was generated. In order to receive the results with 95 % probability and 95 % accuracy, 100 runs were performed with COCOSYS code developed at GRS mbH. The calculated results were processed with SUSA tool. The performed analysis showed a rather low dispersion of the results and only in the initial period of the accident. Besides, the analysis showed that there is no threat to the building structures of Ignalina NPP confinement in case of the considered accident scenario. (author)

  20. Radionuclide Distribution in the Soil on the Stabatishkes Site in the Vicinity of the Ignalina NPP

    Directory of Open Access Journals (Sweden)

    Jevgenij Aliončik

    2011-02-01

    Full Text Available A near surface repository for low and intermediate-level short-lived radioactive waste will be built on the Stabatiškės site in the vicinity of Ignalina NPP during decommissioning works. The reservoir can also be used for the waste stored in the temporary repositories of the Ignalina NPP. Engineering and nature protective barriers are used in the repository for radioactive waste, however, radionuclides can spread into the environment, extend in the biosphere and cause (define the external power light exposure of the environment due to the natural and premature (prescheduled degradation of the engineering barriers of the repository. The properties of the soil (acidity, quantity of organic substances, humidity are being investigated for estimating the possible migration and dispersion of radionuclides. The activity of radionuclides in the soil is also estimated before building the repository. Natural and artificial radionuclides make the pollution of the soil, and therefore the accumulation and vertical migration of artificial (137Cs, 60Co and natural (226Ra, 232Th, 40K radionuclides are being researched in the soil on the Stabatiškės site.Article in Lithuanian

  1. Calculation of the real states of Ignalina NPP Unit 1 and Unit 2 RBMK-1500 reactors in the verification process of QUABOX/CUBBOX code

    International Nuclear Information System (INIS)

    Bubelis, E.; Pabarcius, R.; Demcenko, M.

    2001-01-01

    Calculations of the main neutron-physical characteristics of RBMK-1500 reactors of Ignalina NPP Unit 1 and Unit 2 were performed, taking real reactor core states as the basis for these calculations. Comparison of the calculation results, obtained using QUABOX/CUBBOX code, with experimental data and the calculation results, obtained using STEPAN code, showed that all the main neutron-physical characteristics of the reactors of Unit 1 and Unit 2 of Ignalina NPP are in the safe deviation range of die analyzed parameters, and that reactors of Ignalina NPP, during the process of the reactor core composition change, are operated in a safe and stable manner. (author)

  2. The HYLOCOMIUM SPLENDENS use for research of Ignalina NPP vicinity contamination by Cs 137 and Co 60

    International Nuclear Information System (INIS)

    Kiponas, D.; Marchiulenene, D.

    2002-01-01

    The superficial distribution of Cs 137 and Co 60 and specific activity of these radionuclides in Hylocomium splendens in Ignalina NPP vicinity was investigated. The increase of Cs 137 and Co 60 specific activity in Hylocomium splendens was linked with increasing of these radionuclides activity in atmospheric deposits

  3. The changing of land use and land management in Ignalina NPP region

    International Nuclear Information System (INIS)

    Milius, J.; Ribokas, G.

    1998-01-01

    The investigated locality (Ignalina NPP) represents territory of NPP and Visaginas town as well as agrarian territories of three former environs Dukshtas and Rimshe (Ignalina district) and Turmantas (Zarasai district). The changes of land, started with the beginning of construction works of NPP (1974) and are still taking place, are analyzed. The data on the land fund and current data of land reform agrarian services were used. The changes of the plots of farming lands in agrarian territories were preconditioned by the same factors which operated in other territories of hilly agrarian landscape. In the drained terrains the plots of farming lands increased, whereas, in other territories re naturalization processes set in resulting in the increase of the areas covered with forests and bushes which were not used for agricultural purposes. Thus, we may assert that the impact of the NPP itself on the change of the structure of farming lands in agrarian territories was minimal. It manifested not as a permanent process but as a spontaneous fact - a mechanical allotment of a plots of land for building the NPP and town itself. The comparison of the structure of farming lands at the moment of allotment with the data of 1995 revealed that during the mentioned period the farming land were completely destroyed (1003 ha of ploughed lands, 168 ha - grasslands, 180 ha - pastures). The forest area was reduced by 625 ha. The destroyed farming lands were occupied by territories under buildings (719 ha), artificial ground cover (159 ha), and high tension current lines (over 800 ha) which are absolutely unfit neither for agriculture nor forestry. Though the NPP and Visaginas town exerted no appreciable influence on the structure of farming lands in the surrounding territories they substantially changed the territory of NPP and Visaginas. The former wooded - agrarian landscape was replaced by an untypical for these places technical - urbanized landscape. This should be taken into

  4. Long lasting fish contamination with 90Sr of Ignalina NPP water cooling basin

    International Nuclear Information System (INIS)

    Dusauskiene-Duz, R.; Gudeliene, I.

    2003-01-01

    Between the nourishment chains in hydro ecosystem the main role have chain water-fish-man, because amount of 90 Sr in fish muscle is limited. 90 Sr accumulation and distribution between the fish organs and tissues was studied. It was found that the main way of 90 Sr enter to the Ignalina NPP water cooling basin fish is adsorption processes which is more active than that of absorption. Established regularities of distribution between the fish organs and tissues, which depends on the fish nourishment type and their species. We determined that 90 Sr activity in fish muscles increase from spring to autumn: in Rutilus rutilus - 8, Abramis brama - 6, Perca fluviatilis - 2,7 and Esox lucius - 22,3 times. We determined that 90 Sr activity in fish muscles is 24 times lower than permissible' standard. It was determined that 90 Sr activity in fish gonads is 2 times higher than that in muscles and depends on fish species. (author)

  5. Ignalina NPP its environment, safety and future, prospects of the energetic, ethnic and cultural situation: expert evaluation

    International Nuclear Information System (INIS)

    Morkunas, Z. V.; Ciuzas, A.; Jonaitis, V.; Sutiniene, I.

    1995-01-01

    According to the tasks defined in the 'Atomic Energy and the Environment' program an expert evaluative survey was done for the first time in Lithuania concerning the Ignalina NPP and its consequences and perspectives according to the concept which was prepared. The results of survey analysis, done by Lithuanian experts, are presented. Investigation involved these problems: evolution of the technical state safety, use and prospects of the nuclear power plant; evaluation of the activities of governmental and social institutions in connection with the nuclear power plant; Ignalina NPP and the environment; the effect of the nuclear power plant on agricultural activities and development; evolution of the ethnic and cultural situation; conclusions and recommendations for regulations of those areas. (author). 2 refs., 11 figs

  6. Methodology transfer for the preparation of NPP decommissioning for leading personnel of the Ignalina NPP and for the representatives of Lithuanian authorities

    International Nuclear Information System (INIS)

    Ackermann, L.; Baecker, A.

    2004-01-01

    At request of the Lithuanian government to receive support for the preparation of the decommissioning of Ignalina NPP, a bilateral project was financed by the German federal government to transfer experience from the decommissioning of the Greifswald and Rheinsberg NPPs to the management staff of the Ignalina NPP and to the representatives of the Lithuanian authorities in charge of the decommissioning. The methodology transfer project was prepared and carried out under the leadership of the Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH. The practical implementation was within the responsibility of Energiewerke Nord GmbH (EWN) in cooperation with other German subcontractors. The methodology transfer comprised the task fields of project management, project planning, licensing procedure and waste management as well as social aspects of the further development of the industrial site. Five intensive one-week seminars were conducted mainly at the Greifswald NPP site and the knowledge gained was then consolidated in two evaluation seminars at the Ignalina NPP. As the basis for the training realised in 2002 and 2003, EWN provided about 2000 power-point illustrations, more than 200 transparencies and four video films. The training handouts produced by EWN were delivered to the seminar participants in Russian and English language and documented in the database ''Technische Dokumentation Ost'' (DOKU OST) of GRS. (orig.)

  7. Thermal-hydraulic analysis of Ignalina NPP compartments response to group distribution header rupture using RALOC4 code

    International Nuclear Information System (INIS)

    Urbonavicius, E.

    2000-01-01

    The Accident Localisation System (ALS) of Ignalina NPP is a containment of pressure suppression type designed to protect the environment from the dangerous impact of the radioactivity. The failure of ALS could lead to contamination of the environment and prescribed public radiation doses could be exceeded. The purpose of the presented analysis is to perform long term thermal-hydraulic analysis of compartments response to Group Distribution Header rupture and verify if design pressure values are not exceeded. (authors)

  8. Progress in Low and Intermediate Level Operational Waste Characterization and Preparation for Disposal at Ignalina NPP

    International Nuclear Information System (INIS)

    Poskas, P.; Adomaitis, J. E.; Ragaisis, V.

    2003-01-01

    In Lithuania about 70-80% of all electricity is generated at a single power station, Ignalina NPP, which has two RBMK-1500 type reactors. Units 1 and 2 will be closed by 2005 and 2010, respectively, taking into account the conditions of the long-term substantial financial assistance rendered by the European Union, G-7 countries and other states as well as international institutions. The Government approved the Strategy on Radioactive Waste Management. Objectives of this strategy are to develop the radioactive waste management infrastructure based on modern technologies and provide for the set of practical actions that shall bring management of radioactive waste in Lithuania in compliance with radioactive waste management principles of IAEA and with good practices in force in European Union Member States. SKB-SWECO International-Westinghouse Atom Joint Venture with participation of Lithuanian Energy Institute has prepared a reference design of a near surface repository for short-lived low and intermediate level waste. This reference design is applicable to the needs in Lithuania, considering its hydro-geological, climatic and other environmental conditions and is able to cover the expected needs in Lithuania for at least thirty years ahead. Development of waste acceptance criteria is in practice an iterative process concerning characterization of existing waste, repository development, safety and environmental impact assessment etc. This paper describes the position in Lithuania with regard to the long-term management of low and intermediate level waste in the absence of finalized waste acceptance criteria and a near surface repository

  9. Uncertainty analysis of one Main Circulation Pump trip event at the Ignalina NPP

    International Nuclear Information System (INIS)

    Vileiniskis, V.; Kaliatka, A.; Uspuras, E.

    2004-01-01

    One Main Circulation Pump (MCP) trip event is an anticipated transient with expected frequency of approximately one event per year. There were a few events when one MCP was inadvertently tripped. The throughput of the rest running pumps in the affected Main Circulation Circuit loop increased, however, the total coolant flow through the affected loop decreased. The main question arises whether this coolant flow rate is sufficient for adequate core cooling. This paper presents an investigation of one MCP trip event at the Ignalina NPP. According to international practice, the transient analysis should consist of deterministic analysis by employing best-estimate codes and uncertainty analysis. For that purpose, the plant's RELAP5 model and the GRS (Germany) System for Uncertainty and Sensitivity Analysis package (SUSA) were employed. Uncertainty analysis of flow energy loss in different parts of the Main Circulation Circuit, initial conditions and code-selected models was performed. Such analysis allows to estimate the influence of separate parameters on calculation results and to find the modelling parameters that have the largest impact on the event studied. On the basis of this analysis, recommendations for the further improvement of the model have been developed. (author)

  10. Mutagenic effect of sewage waters of the Ignalina NPP on the cells of sea-trout

    International Nuclear Information System (INIS)

    Stasiunaite, P.

    1996-01-01

    Using a developing embryos of sea-trout as a test-object, the mutagenicity of water in the first biotope of Lake Drukshiai as well as in industrial and rain water sewer pipe was evaluated. Artesian water was used as a control one. The mutagenic potential of water in station 1 of Lake Drukshiai approximately made up 8.1% and statistically did not differ from the control (7.0%). The effect of water of station 7 upon the inherited embryonic cells was significantly greater, average frequency of chromosome aberration reaching 27.3%. The analysis of the obtained data showed that industrial - rain sewage water constantly penetrating into Lake Drukshiai may significantly worsen its ecological situation, i.e. to increase the accumulation of mutations in the communities and their amount in the succeeding generations. The genotoxicity of water of the 1 st biotope of Lake Drukshiai, which is the farthest point from the Ignalina NPP, may be used as a control when investigating the mutagenic impact of water of other biotopes in the lake, especially in the stations located at the shortest distance from the energetic objects. 8 refs., 1 tab

  11. The cultural transformation and political organization of the Ignalina NPP region

    International Nuclear Information System (INIS)

    Daugirdas, V.

    1998-01-01

    The Ignalina NPP region which can be identified with the Visaginas region is rather interesting from the point of view of various scientific investigations. Since long time this land has been in the contact zone of Baltic and Slavonic cultures. Most of the newest phenomena of society development are there rather closely related with the building of NPP. In our opinion the Visaginas region is in the initial stage of development at present by its cultural and political-geographical traits it stands out even in the context of Northeast Lithuania. This is a region distinguished by a particularly high variety of political attitudes and cultural contacts. The political view of the present inhabitants of the region is a result of complicated cultural evolution - the cultural orientation determines the political outlook. Though the political views of the Lithuanian population are still in the stage of development we may assert that the East Lithuanian region already in 1990 stood out as a region of left political views. This view is determined by a mixed national composition. The non-Lithuanians have tradition of supporting the left political forces, their political left-expression is more inert. The fact, that the general activity of voters in Visaginas and its region is relatively low, demonstrates the indifference of some voters to the political development of Lithuania. The status of self-government isolated Visaginas both from the life of its region and Lithuania on the whole - not only politically or culturally but administratively as well. The town is converting into a closed social unit. The problem of the cultural integration of Visaginas region remains of topical importance. In order to prevent the self-isolation it is necessary to faster the sense of civil self-expression, encourage the development programs of the region. (author)

  12. The influence of the Ignalina NPP on the people's life and on the development of business

    International Nuclear Information System (INIS)

    Klichius, A.

    1998-01-01

    The article summarize the results of the sociological survey, discuss the influence of the Ignalina nuclear power plant on the people's life and on the development of business in the North East of Lithuania (Ignalina, Shvenchionys, Utena, Zarasai districts and Visaginas town), reveal the discrepant part of the nuclear power plant, the problems of business development. (author)

  13. The distribution of radionuclides between the sediments and macrophytes in the cooling pond of the Ignalina NPP - The Distribution of Radionuclides in Freshwater Hydro Ecosystem's Bottom Sediments and Macrophytes depending on the Ecological Conditions

    International Nuclear Information System (INIS)

    Marciulioniene, D.; Jefanova, O.; Mazeika, J.

    2014-01-01

    The distribution of 137 Cs, 60 Co, 54 Mn in the aquatory of lake Drukshiai (the monitoring stations), the coastal area of this lake, the industrial drainage systems channel of the Ignalina NPP and the cooling water channel of the Ignalina NPP was analyzed on the basis of long-term (1988-2009) investigations of radionuclides specific activity in bottom sediments and macrophytes, also the ability of radionuclides falling into lake Drukshiai from the Ignalina NPP through effluents channels was assessed. It was established that 137 Cs, 60 Co and 54 Mn in the bottom sediments and the macrophytes were distributed quite differently in the monitoring stations of lake Drukshiai and the coastal area as well as in the industrial drainage systems channel of the Ignalina NPP and the cooling water channel of the Ignalina NPP. The different characteristics of the sediments, various ecological conditions, as well as the existing anthropogenic environmental factors and the different in the ecological groups of the plants could have had impact on the distribution of 137 Cs, 60 Co and 54 Mn in the bottom sediments and the aquatic plants in lake Drukshiai and the effluents channels of the Ignalina NPP. The 137 Cs, 60 Co and 54 Mn specific activity's values were significantly higher in macrophytes from the industrial drainage systems channel of Ignalina NPP than in macrophytes from the cooling water channel. Nevertheless the specific activities level of these radionuclides differed only slightly in the macrophytes from the areas which were impacted by the effluents channels of the Ignalina NPP. This can be explained by the fact that the phyto-remediation (as the form of auto-purification) of these effluents from the radionuclides had been present in the industrial drainage systems channel of Ignalina NPP before entering the water into lake Drukshiai. (authors)

  14. The distribution of radionuclides between the sediments and macrophytes in the cooling pond of the Ignalina NPP - The Distribution of Radionuclides in Freshwater Hydro Ecosystem's Bottom Sediments and Macrophytes depending on the Ecological Conditions

    Energy Technology Data Exchange (ETDEWEB)

    Marciulioniene, D.; Jefanova, O.; Mazeika, J. [Nature Research Centre, Akademijos str. 2, LT-08412 Vilnius, Lietuva (Lithuania)

    2014-07-01

    The distribution of {sup 137}Cs, {sup 60}Co, {sup 54}Mn in the aquatory of lake Drukshiai (the monitoring stations), the coastal area of this lake, the industrial drainage systems channel of the Ignalina NPP and the cooling water channel of the Ignalina NPP was analyzed on the basis of long-term (1988-2009) investigations of radionuclides specific activity in bottom sediments and macrophytes, also the ability of radionuclides falling into lake Drukshiai from the Ignalina NPP through effluents channels was assessed. It was established that {sup 137}Cs, {sup 60}Co and {sup 54}Mn in the bottom sediments and the macrophytes were distributed quite differently in the monitoring stations of lake Drukshiai and the coastal area as well as in the industrial drainage systems channel of the Ignalina NPP and the cooling water channel of the Ignalina NPP. The different characteristics of the sediments, various ecological conditions, as well as the existing anthropogenic environmental factors and the different in the ecological groups of the plants could have had impact on the distribution of {sup 137}Cs, {sup 60}Co and {sup 54}Mn in the bottom sediments and the aquatic plants in lake Drukshiai and the effluents channels of the Ignalina NPP. The {sup 137}Cs, {sup 60}Co and {sup 54}Mn specific activity's values were significantly higher in macrophytes from the industrial drainage systems channel of Ignalina NPP than in macrophytes from the cooling water channel. Nevertheless the specific activities level of these radionuclides differed only slightly in the macrophytes from the areas which were impacted by the effluents channels of the Ignalina NPP. This can be explained by the fact that the phyto-remediation (as the form of auto-purification) of these effluents from the radionuclides had been present in the industrial drainage systems channel of Ignalina NPP before entering the water into lake Drukshiai. (authors)

  15. Generalization of Nuclear Safety and Course of Accident Events Research in the Ignalina NPP; Branduolines saugos ir avariju eigos Ignalinos AE tyrimu apibendrinimas

    Energy Technology Data Exchange (ETDEWEB)

    Kaliatka, A; Uspuras, E [Lithuanian Energy Institute, Kaunas (Lithuania)

    2001-07-01

    The safety analysis shown that after implementation of SAR recommendations Ignalina NPP is adequately protected against accidents which required fast initiation of automatic protections. In case of accidents with long-term loss of core cooling additional operator actions are required. Accident management in case long-term core cooling are analyzed in this paper. (author)

  16. INPP Landfill[Disposal of very low level radioactive waste at Ignalina NPP

    Energy Technology Data Exchange (ETDEWEB)

    Dahlberg, Jan; Bergstroem, Ulla

    2004-06-15

    The objective of this report is to propose the basic design for final disposal of Very Low Level Radioactive Waste (VLLW) produced at the Ignalina Nuclear Power Plant and at other small waste producers in Lithuania. Considering the safety for the environment, as well as the construction costs, it has been decided that the repository will be of a landfill type based on the same design principles as similar authorised facilities in other countries. It has also been decided that the location of the landfill shall be in the vicinity of the Ignalina Nuclear Power Plant (INPP)

  17. The precondition of social mobility in Ignalina NPP and its area

    International Nuclear Information System (INIS)

    Mikshys, A.

    1998-01-01

    In the paper some preconditions of social mobility in the northern Lithuania (Ignalina nuclear power plant) and in its area are analyzed. The results of the sociological research reveal the desire of some part of the inhabitants of the nuclear power plant area to change their social status and the place of residence. The difficult social and demographically situation in this region as significant is noted. The author proposes some mean for the normalization of this situation. (author)

  18. Ignalina Safety Analysis Group

    International Nuclear Information System (INIS)

    Ushpuras, E.

    1995-01-01

    The article describes the fields of activities of Ignalina NPP Safety Analysis Group (ISAG) in the Lithuanian Energy Institute and overview the main achievements gained since the group establishment in 1992. The group is working under the following guidelines: in-depth analysis of the fundamental physical processes of RBMK-1500 reactors; collection, systematization and verification of the design and operational data; simulation and analysis of potential accident consequences; analysis of thermohydraulic and neutronic characteristics of the plant; provision of technical and scientific consultations to VATESI, Governmental authorities, and also international institutions, participating in various projects aiming at Ignalina NPP safety enhancement. The ISAG is performing broad scientific co-operation programs with both Eastern and Western scientific groups, supplying engineering assistance for Ignalina NPP. ISAG is also participating in the joint Lithuanian - Swedish - Russian project - Barselina, the first Probabilistic Safety Assessment (PSA) study of Ignalina NPP. The work is underway together with Maryland University (USA) for assessment of the accident confinement system for a range of breaks in the primary circuit. At present the ISAG personnel is also involved in the project under the grant from the Nuclear Safety Account, administered by the European Bank for reconstruction and development for the preparation and review of an in-depth safety assessment of the Ignalina plant

  19. Experience in development and implementation of Control Room continuing training programme at Ignalina NPP

    International Nuclear Information System (INIS)

    Peradze, K.

    2002-01-01

    Based on the same SAT principles each NPP (or operating organisation) goes by its own way, which is defined by available resources, assistance, NPP operational conditions, including policy, economics and public opinion. There were several groups of factors, which are very important to provide quality of training- Time, Human Resources and material resources. We pay especial attention to simulator training. In different conditions personnel behaviour is defined by knowledge, rule or skills. It is very difficult to develop unknown to personnel scenarios. But sometimes- real events not described in plant procedures take place at Nuclear Power Plants. Therefore during NPP events analysis we pay a especial attention searching for situation when knowledge or rule defines personnel behaviour. To provide analysis and statistics of Control Room Personnel training at INPP simulator we developed 'INPP events computer data base'. (author)

  20. The assessment of ionising radiation impact on the cooling pond freshwater ecosystem non-human biota from the Ignalina NPP operation beginning to shut down and initial decommissioning.

    Science.gov (United States)

    Mazeika, J; Marciulioniene, D; Nedveckaite, T; Jefanova, O

    2016-01-01

    The radiological doses to non-human biota of freshwater ecosystem in the Ignalina NPP cooling pond - Lake Druksiai were evaluated for several cases including the plant's operation period and initial decommissioning activities, using the ERICA 1.2 code with IAEA SRS-19 models integrated approach and tool. Among the Lake Druksiai freshwater ecosystem reference organisms investigated the highest exposure dose rate was determined for bottom fauna - benthic organisms (mollusc-bivalves, crustaceans, mollusc-gastropods, insect larvae), and among the other reference organisms - for vascular plants. The mean and maximum total dose rate values due to anthropogenic radionuclide ionising radiation impact in all investigated cases were lower than the ERICA screening dose rate value of 10 μGy/h. The main exposure of reference organisms as a result of Ignalina NPP former effluent to Lake Druksiai is due to ionizing radiation of radionuclides (60)Co and (137)Cs, of predicted releases to Lake Druksiai during initial decommissioning period - due to radionuclides (60)Co, (134)Cs and (137)Cs, and as a result of predicted releases to Lake Druksiai from low- and intermediate-level short-lived radioactive waste disposal site in 30-100 year period - due to radionuclides (99)Tc and (3)H. The risk quotient expected values in all investigated cases were <1, and therefore the risk to non-human biota can be considered negligible with the exception of a conservative risk quotient for insect larvae. Radiological protection of non-human biota in Lake Druksiai, the Ignalina NPP cooling pond, is both feasible and acceptable. Copyright © 2015 Elsevier Ltd. All rights reserved.

  1. The dry spent RBMK fuel cask storage site at the Ignalina NPP in Lithuania

    International Nuclear Information System (INIS)

    Penkov, V.V.; Diersch, R.

    1999-01-01

    At present, there are about 15,000 spent RBMK fuel assemblies stored in the water pools near the reactors at the Ignalina Nuclear Power Plant (INPP). Part of them are cut in two bundles and stored in standardized baskets in the pools. Each basket is loaded with 102 bundles. For long-term interim storage of this fuel, it was decided to use dry storage in casks. For this reason, the total activity to be stored is split into individual units (casks). Each cask represents a closed and independent safety system, fulfilling all safety-relevant requirements for both normal operational and hypothetical accidental conditions. The main safety relevant features of the storage cask system are: (1) Inherent safety system; (2) Double barrier system; (3) Passive cooling by natural convection; (4) Safety against accidents. The cask dry storage system is a cost effective and multi-functional system for storage, transport after the operation time and final disposal under consideration of additional protective elements. From an economical point of view, cask storage has a number of advantages. Two cask types have been intended for the INPP storage site: (1) The CASTOR RBMK cask made of ductile cast iron; (2) The CONSTOR RBMK sandwich cask made of an inner and outer steel shell and reinforced heavy concrete. The CASTOR RBMK and the CONSTOR RBMK casks are designed to withstand severe storage site accidents and with help of impact limiters - to fulfil the IAEA test criteria for type B(U)F packages. The INPP spent RBMK fuel storage site is designed as an open air storage for an operational time of 50 years. The casks are arranged on the concrete storage pad. The site is equipped with a crane for cask handling and technological buildings and security systems. The safety analyses for fuel and cask handling and for cask handling and for cask technology at the site have been made and accepted by the Lithuanian Competent Authority. (author)

  2. The impact of Ignalina NPP and Visaginas town on the social territorial processes in the region: the peculiarities of geographical investigation

    International Nuclear Information System (INIS)

    Baubinas, R.

    1998-01-01

    The present work is a discussion of some aspects of organization and methodological substantiation of the state research programme T he Atomic Energetic and Environment . It contains the material of complex social geographical investigations in the Ignalina NPP region carried out in 1995 -1997. The discussed theme is of topical importance because the NPP infrastructure effects all spheres of environment, i. e. not only the nature but the society, way of thinking and integrated formations, occurring as a result of their interaction, as well. The main aim of investigation is to determine the impact of the functioning Ignalina NPP and its infrastructure (including the Visaginas town) on the social environment emphasizing the effect on the social territorial processes. The main tasks are - to reveal the impact of NPP on the regional economic, social, demographic, political and cultural processes in the context of ecological and psychological impact. The Ignalina NPP and Visaginas region is in the state of formation. This process is going on in a very controversial environment, under the conditions of social and cultural isolation. For the geographical situation, functional peculiarities and history this region cannot be attributed to any usual types of region. The social relations of Visaginas with the environment are poor as a result of the ex centric situation of the town, lack communication and mentioned cultural self isolation. Notwithstanding the large social potential of Visaginas it is unable to carry out the functions of regional center. In the international relation of the region the social psychological constituent prevails. For lack of ecological, cultural and, particularly, social relations the political problems of this trans national region are likely to become more acute in the future. Therefore, conditions for rational development of the region will be more difficult. Taking into account the character and development of social territorial processes it

  3. Phytotoxic effects of bottom sediments from Ignalina NPP wastewater canals and cooler

    International Nuclear Information System (INIS)

    Montvydiene, D.

    2002-01-01

    In the paper impact of Ignalina Nuclear Power Plant (INPP) waste upon phytotoxicity of sediments from Lake Drukshiai was recognized. Samples of bottom sediments were collected from various wastewater canals of INPP, from the canal of wastewater treatment plant (WWTP), small lake and rivulet, which are on the route of that wastes into Drukshiai. In 1995, 132 sites of Drukshiai were observed in order to assess the phytotoxicity of its bottom sediments. The research was carried out in July of 1993-2000. Number of somatic mutations (pink, colourless and morphological) and nonviable stamen hairs (the quantity of whose indicates lethality, when hair contains less than 12 cells) in Tradescantia (clone 02) stamen hair (SH) system was counted. Genotoxic effect of bottom sediments on Tradescantia was estimated according to Sparrow et al. (1972) and Marciulioniene et al. (1996). Genotoxic effects were considered weak if amount of somatic mutations not exceeded 1%, there were no non-viable stamen hairs, and medium effect was when the number of somatic mutations was between 1.0-4.0% and non-viable stamen hairs did not reach 40,0%. As well as strong effect was when numbers of somatic mutations and non-viable stamen hairs exceeding 4.0% and 40.0%, respectively. L. sativum is a rather sensitive, widely applied biotest because of its simplicity, cheapness and short duration. This test based on Magone (1989) method and lasted for 48 hours, after which time the seeds germination and root length of seedlings was measured. Tested bottom sediments causing percent inhibitions of 100-60%, 61-40%, 41-20%, and 20-0% were classified as highly toxic, moderately toxic, slightly toxic and non-toxic, respectively. Estimations in both cases were run in triplicates. The data were estimated using the analysis of variance with significance defined at α = 0,05. It was established that in accordance with the phytotoxic impact, the wastes discharged by INPP into Drukshiai in 1993-2000 are attributed

  4. Design, construction and commissioning of the new solid waste management and storage facilities of Ignalina NPP, Lithuania

    Energy Technology Data Exchange (ETDEWEB)

    Goehring, R.; Wenninger, K. [RWE NUKEM GmbH, Alzenau (Germany)

    2006-04-15

    The contract for the design, construction and commissioning (turn-key) of the New Solid Waste Management and Storage Facilities (SWMSF) has been awarded to RWE NUKEM GmbH. The contract was signed on the 30.11.2005. The New Solid Waste Management and Storage Facilities (SWMSF) are financed by the Ignalina Decommissioning Support Fund which is managed by European Bank for Reconstruction and Development (EBRD). The new facilities are required on the Ignalina Nuclear Power Plant (INPP) in order to support ongoing decomissioning work, including removal of waste from existing waste storage buildings. (orig.)

  5. Civil emergency preparedness at the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    1998-12-01

    Workshop was held in the frame of Lithuania's cooperation with NATO on disasters management subject and was concentrated on the preparation of management of nuclear accident at Ignalina NPP. The following topics were covered: emergency preparedness inside Ignalina NPP, preparedness for nuclear accidents at national level, experience in Nordic countries and IAEA activities in harmonization of nuclear emergency preparedness in different countries

  6. Design, construction and commissioning of an interim spent fuel store for the decommissioning of Ignalina NPP, Lithuania

    International Nuclear Information System (INIS)

    Rainer Goehring; Martin Beverungen; Phil Smith

    2006-01-01

    The contract for the design, construction and commissioning (turn-key) of an interim spent fuel store facility (ISFSF) has been awarded to a Consortium of GNS Gesellschaft fuer Nuklear Service and RWE NUKEM GmbH under the lead of RWE NUKEM. The contract was signed on the 12.01.2005. The Interim Spent Fuel Storage Facility (ISFSF) is financed by the Ignalina Decommissioning Support Fund which is managed by EBRD. All spent fuel assemblies, currently stored in the spent fuel pits at the reactors plus future arising (about 18000 in total) will be loaded in the CONSTOR R RBMK1500/M2 containers, which are stored in the new facility. The initial contract has been awarded for 3500 spent fuel assemblies. (authors)

  7. Pilot Operation of Ex-core Neutron Sensors of Divers Shutdown System (DSS) Unit 2 Ignalina NPP

    International Nuclear Information System (INIS)

    Jakshtonis, Z.; Krivoshei, G.

    2006-01-01

    The Ignalina Safety Assessment, which was completed in December 1996, recommended the installation of a diverse shutdown system on the 2nd unit at Ignalina. During the PPR-2004 in the DSS project are created two independent shutdown systems by separating the absorber rods into two independent groups as follows: 1. One system (designated AZ) consists of the existing 24 BAZ rods and 49 AZ/BSM rods that together are used for reliable reactor shutdown (including Control and Protection System (CPS) circuit voiding accident). This system performs the emergency protection function. 2. The other system (designated BSM) comprises the remaining absorber rods and the 49 AZ/BSM rods. Thus 49 AZ/BSM rods are actuated from AZ initiating equipment as well as from BSM initiating equipment. The BSM system performs the normal reactor shutdown function and is able to ensure long-term maintenance of the reactor in the sub-critical state. Along with implementation of DSS was modernized existing Emergency Process Protection System, which was divided into two independent Sets of initiating equipment. The DSS is independent and diverse initiating equipment from the existing 1st Set equipment; with each set having its own independent in-core and ex-core sensors for measurement of neutron flux and process parameters. The 2nd Set of initiating equipment for measuring ex-core neutron flux, was modernized with new design of 4 Ex-Core detectors each have a single low level neutron flux detector and two high range neutron detectors. They are comprising: 1. A fission chamber which operates in pulse mode to cover the low flux levels. 2. A compensated ionisation chamber in current mode to operate at high flux level. This detector is doubled to give a measurement of the axial deviation. Two detectors are enough to produce the axial power deviation. The results of testing and analysis of pilot operation of ex-core neutron sensors of DSS will be shown on the Report. (author)

  8. Promotion of a good safety culture at Ignalina RBMKs; Vnedrenie kul`tury bezopasnosti na Ignalinskoj AEhS

    Energy Technology Data Exchange (ETDEWEB)

    Shevaldin, V [Ignalina NPP, Visaginas (Lithuania)

    1997-12-31

    The presentation discusses the following issues: politics of Ignalina nuclear power plant in the area of safety and quality assurance; check of safety conditions; the activities of the Safety committee at the Ignalina NPP.

  9. The standpoint of the residents of Daugavpils region to the conditions of life and activities in Ignalina NPP area

    International Nuclear Information System (INIS)

    Menshikov, V.

    1998-01-01

    In April,1997 the questionnaire of the population older then 18 years old in 9 districts of Daugavpils region, who live in the zone of Ignalina nuclear electric power station and the survey of the experts from the number of the leaders of the district authorities and regional council, the specialists in the sphere of the environment and people's health protection, civil defense were conducted in accordance with the program of the sociological investigation, which was elaborated by specialists of two scientific institutions (The Lithuanian Institute of Philosophy and Sociology and Daugavpils Pedagogical University). The analysis of the empirically received material permits to value rather completely the living conditions in the zone of Ignalina station, the perspectives of the economic activity, as well as the ecological risk and safety in the perception of the population and experts. The population and the experts in their majority admit the danger of the nuclear electric power station influence on the environment. 89% of the respondents consider that the station creates danger for the nature, 88% - for people's health. For all that, the biggest danger for nature is air pollution (71 % of population thinks so). In the second place - radioactive influence (64%). Among the main reasons, which increase the risk of the station work are following: a diversion can be committed at the station (50%) the station can be exposed to a bombardment during a war (49%) technological defect, which have been committed during the station building and which have not been removed yet (49%), the environment of the station is not able to absorb the pollution, which is going to increase (48%). To the confirmation of their anxieties and fears the part of the respondents name the concrete fact from the negative influences of the station on the climate, the animal and vegetable world, man's health. The dominant opinion of the inhabitants about the future of the station - it is necessary to

  10. Dynamics of B group vitamins - the exametabolits of algae in lake Drukshiai - the cooler of Ignalina NPP in 1994

    International Nuclear Information System (INIS)

    Shlapkauskaite, G.; Pashkauskas, R.

    1995-01-01

    The investigations on 6 B group vitamins were carried out in the water of Lake Drukshiai in 1994. The results indicated that quantitative structure of the vitamins varied during seasons in different areas depths of the lake depending on the biomass of phytoplankton and their dominants. The vitamins balance characteristic to natural water basins was disturbed after the NPP operation. In summer of 1994 the amount of vitamins decreased and the deficit of biotin, thiamin and pyridoxine was observed to compare with 1992-1993. Therefore, the disturbance of stability in metabolic processes in which these vitamins take part may occur. (author). 11 refs., 2 tabs., 2 figs

  11. The Ignalina Nuclear Power Plant: refutation of skepticism

    International Nuclear Information System (INIS)

    Ashmantas, L.

    1999-01-01

    Brief overview of nuclear power development in Lithuania since regaining independence in 1990 is presented. It includes the description of establishment of administrative and regulatory framework, implementation of safety analysis and upgrading programs of Ignalina NPP

  12. Ignalina Safety Analysis Group's report for the year 1998

    International Nuclear Information System (INIS)

    Uspuras, E.; Augutis, J.; Bubelis, E.; Cesna, B.; Kaliatka, A.

    1999-02-01

    Results of Ignalina NPP Safety Analysis Group's research are presented. The main fields of group's activities in 1998 were following: safety analysis of reactor's cooling system, safety analysis of accident localization system, investigation of the problem graphite - fuel channel, reactor core modelling, assistance to the regulatory body VATESI in drafting regulations and reviewing safety reports presented by Ignalina NPP during the process of licensing of unit 1

  13. State of the Art of the Ignalina RBMK-1500 Safety

    International Nuclear Information System (INIS)

    Uspuras, E.

    2010-01-01

    Ignalina NPP is the only nuclear power plant in Lithuania consisting of two units, commissioned in 1983 and 1987. Unit 1 of Ignalina NPP was shut down for decommissioning at the end of 2004 and Unit 2 is to be operated until the end of 2009. Both units are equipped with channel-type graphite-moderated boiling water reactors RBMK-1500. The paper summarizing the results of deterministic and probabilistic analyses is developed within 1991 to 2007 by specialists from Lithuanian Energy Institute. The main operational safety aspects, including analyses performed according the Ignalina Safety Improvement Programs, development and installation of the Second Shutdown System and Guidelines on Severe Accidents Management are discussed. Also the phenomena related to the closure of the gap between fuel channel and graphite bricks, multiple fuel channel tube rupture, and containment issues as well as implication of the external events to the Ignalina NPP safety are discussed separately.

  14. Ignalina Nuclear Power Plant and the Environment. Scientific research program: 1993-1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The aim of the research program is not only to asses the impact of the Ignalina NPP to the ecosystems. There was a need to study the region of Ignalina NPP as a comprehensive nature complex, not limited by the interests or potential of one institution. The implementation of such program could provide scientific conclusions vital for formulating the strategies of nature and health protection under the conditions of normal and emergency operational regimes of Ignalina NPP. The program will be carried out by 250 members of 13 research and academic institutions and will continue from 1993 till 1997. (author). 13 refs., 13 figs.

  15. Ignalina Nuclear Power Plant and the Environment. Scientific research program: 1993-1997

    International Nuclear Information System (INIS)

    1993-01-01

    The aim of the research program is not only to asses the impact of the Ignalina NPP to the ecosystems. There was a need to study the region of Ignalina NPP as a comprehensive nature complex, not limited by the interests or potential of one institution. The implementation of such program could provide scientific conclusions vital for formulating the strategies of nature and health protection under the conditions of normal and emergency operational regimes of Ignalina NPP. The program will be carried out by 250 members of 13 research and academic institutions and will continue from 1993 till 1997. (author). 13 refs., 13 figs

  16. Status of Ignalina's safety analysis reports

    International Nuclear Information System (INIS)

    Uspuras, E.

    1999-01-01

    Ignalina NPP is unique among RBMK type reactors in the scope and comprehensiveness of international studies which have been performed to verify its design parameters and analyze risk levels. International assistance took several forms, a very valuable mod of assistance utilized the knowledge of international experts in extensive international studies whose purpose was: collection, systematization and verification of plant design data; analysis of risk levels; recommendations leading to improvements in the safety lave; transfer of state of the art analytical methodology to Lithuanian specialists. The major large scale international studies include: probabilistic risk analysis; extensive international study meant to provide comprehensive overview of plant status with special emphasis on safety aspects; an extensive review of the Safety Analysis Report by an independent group of international experts. In spite of the safety improvements and analyses which have been performed at the Ignalina NPP, much remains to be done in the nearest future

  17. Detailed description of a new management system for solid, short-lived low and intermediate level radioactive waste at Ignalina NPP

    International Nuclear Information System (INIS)

    2002-01-01

    The objective is to modify and extend the existing system at the Ignalina Nuclear Power Plant (INPP) for handling of Very Low Level Waste (VLLW), short lived Low and Intermediate Level Waste (LLW-SL and ILW-SL). The ultimate aim is to reduce the risks and the influence on the personnel and the environment. According to the request from INPP, the modified system is based on the existence of an incineration plant. This system description describes treatment of non-combustible VLLW, LLW-SL and ILW-SL at a new waste handling facility (WHF) located in the future buildings 159/2 and 159/3 at the INPP. The new WHF is also handling Exempt Waste (EW), Reusable Material (RM) and Free Release Goods (FRG). The buildings 159/2 and 159/3 are future extensions of the existing building 159. (author)

  18. External events analysis of the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Liaukonis, Mindaugas; Augutis, Juozas

    1999-01-01

    This paper presents analysis of external events impact on the safe operation of the Ignalina Nuclear Power Plant (INPP) safety systems. Analysis was based on the probabilistic estimation and modelling of the external hazards. The screening criteria were applied to the number of external hazards. The following external events such as aircraft failure on the INPP, external flooding, fire, extreme winds requiring further bounding study were analysed. Mathematical models were developed and event probabilities were calculated. External events analysis showed rather limited external events danger to Ignalina NPP. Results of the analysis were compared to analogous analysis in western NPPs and no great differences were specified. Calculations performed show that external events can not significantly influence the safety level of the Ignalina NPP operation. (author)

  19. Planning for decommissioning of Ignalina Nuclear Power Plant Unit-1

    International Nuclear Information System (INIS)

    Poskas, P.; Poskas, R.; Zujus, R.

    2002-01-01

    In accordance to Ignalina NPP Unit 1 Closure Law, the Government of Lithuania approved the Ignalina NPP Unit 1 Decommissioning Program until 2005. For enforcement of this program, the plan of measures for implementation of the program was prepared and approved by the Minister of Economy. The plan consists of two parts, namely technical- environmental and social-economic. Technical-environmental measures are mostly oriented to the safe management of spent nuclear fuel and operational radioactive waste stored at the plant and preparation of licensing documents for Unit 1 decommissioning. Social-economic measures are oriented to mitigate the negative social and economic impact on Lithuania, inhabitants of the region, and, particularly, on the staff of Ignalina NPP by means of creating favorable conditions for a balanced social and economic development of the region. In this paper analysis of planned radioactive waste management technologies, licensing documents for decommissioning, other technical-environmental and also social-economic measures is presented. Specific conditions in Lithuania important for defining the decommissioning strategy are highlighted. (author)

  20. The socio-economic monitoring of the Ignalina Nuclear Power Plant region: methodology, programme, implementation

    International Nuclear Information System (INIS)

    Baubinas, R.; Burneika, D.; Daugirdas, V.

    2002-01-01

    The article is devoted to the argumentation of the main principles of socio-economic monitoring of the Ignalina NPP region. The programme and the territorial levels of the monitoring as well as the main results of the trial of the programme are presented. (author)

  1. Upgrade of Control and Protection System of the Ignalina Nuclear Power Plant Units 1 and 2

    International Nuclear Information System (INIS)

    Wright, Ronald E.; Fletcher, Norman; Sidnev, Victor E.; Bickel, John H.; Vianello, Aldo; Pearsall, Raymond D.

    2003-01-01

    The Ignalina nuclear power plant (NPP) Units 1 and 2 are Soviet-designed, RBMK (Reaktor Bolshoi Moschnosti Kipyashchiy), channelized, large power-type reactors. The original-design electrical capacity for each unit was 1500 MW. Unit 1 began operating in 1983, and Unit 2 was started up in 1987. In 1994, the government of Lithuania agreed to accept grant support for the Ignalina NPP Safety Improvement Program with funding supplied by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). As conditions for receiving this funding, the Ignalina NPP agreed to prepare a comprehensive safety analysis report that would undergo independent peer review after it was issued. The EBRD Safety Panel oversaw preparation and review of the report. In 1996, the safety analysis report for Unit 1 was completed and delivered to the EBRD. Part of the analyses covered anticipated transients without scram (ATWS). The analysis showed that some ATWS scenarios could lead to unacceptable consequences in <1 min. The EBRD Safety Panel recommended to the government of Lithuania that the Ignalina NPP develop and implement a program of compensatory measures for the control and protection system before the unit would be allowed to return to operation following its 1998 maintenance outage. A compensatory control and protection system that would mitigate the unacceptable consequences was designed, procured, manufactured, tested, and installed. The project was funded by U.S. Department of Energy

  2. Review of the safety analysis of the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Weber, J.P.

    1999-01-01

    Description of the review of safety analysis report (SAR) of Ignalina NPP is presented. this review, called RSR, was conducted by independent group of international experts. SAR and RSR represented a unique international effort in a very short time. It was first attempt to provide Western-type SAR for any Soviet designed NPP. SAR was completed in December 1996, RSR was completed in March 1997. SAR has produced 85 reports, available on CR-ROM and RSR produced 86 reports also available on CD-ROM. SAR presented a large list of recommendations. RSR agreed with most of SAR recommendations and added further recommendations. SAR and RSR contributed significantly to better understanding of RBMK plant behaviour. Ignalina NPP has responded to the SAR/RSR recommendations by an ambitious Safety Improvement Programme SIP-2 which currently is under implementation

  3. Report raises questions about Ignalina shutdown

    Index Scriptorium Estoniae

    2004-01-01

    Balti riikide, Valgevene ja Venemaa energiafirmade juhid saatsid Leedu peaministrile Algirdas Brazauskasele kirja, milles märgivad, et viie riigi energiatööstus ei oleks peale Ignalina tuumajaama esimese reaktori sulgemist enam usaldusväärne

  4. Estonian ambassador ensures support for Ignalina extension

    Index Scriptorium Estoniae

    2008-01-01

    Eesti saadik Vilniuses Andres Tropp kinnitas Eesti toetust Leedu püüdlustele pikendada Ignalina tuumareaktori töötamisaega. Einari Kisel majandusministeeriumist arvas, et sulgemine kiirendaks uue tuumajaama ehitust

  5. Symptom-based emergency operating procedures development for Ignalina NPP

    International Nuclear Information System (INIS)

    Kruglov, Y.

    1999-01-01

    In this paper and lecture are presented: (1) Introduction; (2) EOP project work stages and documentation; (3) Selection and justification of accident management strategy; (4) Content of EOP package; (5) Development of EOP package; (6) EOP package verification; (7) EOP package validation; (8) EOP training; (9) EOP implementation; (10) Conditions of symptom-based emergency operating producers package application and its interconnection with event-based emergency operating procedures; (11) Rules of EOP application; EOP maintenance

  6. Metrics for determining hydrophytic vegetation in wetland delineation: a clarification on the prevalence index

    Science.gov (United States)

    Diane De Steven

    2015-01-01

    A recent publication and an article in Wetland Science & Practice (Lichvar and Gillrich 2014b, 2014a) discuss two metrics for determining if vegetation is hydrophytic for purposes of U.S. wetland delineations, the Prevalence Index (PI) and a proposed Hydrophytic Cover Index (HCI). Based on Wentworth et al. (1988), the PI is a weighted average of ordinal scores (1-5...

  7. Biosolubilization of uranyl ions in uranium ores by hydrophyte plants

    International Nuclear Information System (INIS)

    Cecal, Alexandru; Calmoi, Rodica; Melniciuc-Puica, Nicoleta

    2006-01-01

    This paper investigated the bioleaching of uranyl ions from uranium ores, in aqueous medium by hydrophyte plants: Lemna minor, Azolla caroliniana and Elodea canadensis under different experimental conditions. The oxidation of U(IV) to U(VI) species was done by the atomic oxygen generated in the photosynthesis process by the aquatic plants in the solution above uranium ores. Under identical experimental conditions, the capacity of bioleaching of uranium ores decreases according to the following series: Lemna minor > Elodea canadensis > Azolla caroliniana. The results of IR spectra suggest the possible use of Lemna minor and Elodea canadensis as a biological decontaminant of uranium containing wastewaters. (author)

  8. Sociological researches in the region of Ignalina nuclear power plant: stages and content

    International Nuclear Information System (INIS)

    Chiuzhas, A.

    1998-01-01

    The article examines the sociological researches made by the scientific researchers of the Lithuanian Institute of Philosophy and Sociology during the period of 1989-1997. The investigation in this region was started on the eve of Lithuanian independence restoration. The scientists wanted to find out the integration problems and difficulties of Visaginas population to the transformational life of Lithuania. Another reason of the research set for the first time in Lithuania was the investigation of the attitudes of Visaginas inhabitants to the influence of Ignalina NPP upon people and environment, economic and social development. In 1993 the research was started in accordance with the State's program T he Atomic Energetic and Environment a nd last up to 1997. It included three stages. In the first place the examination of the experts a survey about the evaluation of living environment, ecological and social state was done. The second stage surveyed the work conditions and the social psychological atmosphere in the Ignalina NPP. The investigation of the living and activity conditions of the regional population was done in the third stage. (author)

  9. Fire hazard analysis at the first unit of the Ignalina nuclear power plant: 1. Analysis of fire prevention and ventilation systems and secondary effects

    International Nuclear Information System (INIS)

    Poskas, P.; Simonis, V.; Zujus, R. and others

    2004-01-01

    Evaluation of the fire prevention and ventilation systems and the secondary effects on safety at the Ignalina NPP from the point of view of fire hazard using computerized system is presented. Simplified screening algorithms for fire prevention, ventilation and the evaluation of secondary effects are developed, which allow accelerating fire hazard analysis at the Ignalina NPP. The analysis indicated that the fire prevention systems practically meet the national requirements and international recommendations for fire prevention. But it is necessary to introduce in separate rooms the measures improving fire prevention to guarantee the effective functioning of the ventilation systems and the reduction of the influence of secondary effects on safety. Computerized system of fire prevention and ventilation systems and evaluation of secondary effects on safety can be easily applied for fire hazard analysis at different big plants. (author)

  10. Main findings, conclusions and recommendations of the Ignalina Safety Panel

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1999-01-01

    Ignalina Safety Panel was created to define, monitor and supervise the scope and production of the Ignalina Safety Analysis Report (SAR) and its Review (RSR); to review results of in-depth safety assessment addressing important contradictory statements; to give Lithuanian Government recommendations in view of further licensing process. In this paper General and Specific Recommendations provided by the Panel are presented

  11. Decontamination of radioactive liquid wastes by hydrophytic vegetal organisms

    International Nuclear Information System (INIS)

    Cecal, Al; Popa, K.; Potoroaca, V.; Melniciuc-Puica, N.

    2001-01-01

    Bioaccumulation of some radioactive ions from contaminated waste solutions, on hydrophytic vegetal organisms is discussed. In order to follow the distribution of radioactive ions 137 Cs + , 60 Co 2+ and 51 Cr 3+ in various cell components extracted from Spirulina platensis, Porphiridium cruentum, Scenedesmus quadricauda, Lemna minor, Elodea canadensis, Pistia stratiotes and Riccia fluitans, the plants were cultivated in radioactive solutions. The resulting complexes were extracted with acetone or acetic acid and separated chromatographically. The results show an intense activity of the polysaccharide and lipoid fractions in the bioaccumulation process. The bioaccumulation varies in the series: Spirulina > Scenedesmus > Porphiridium > Riccia > Pistia > Lemna ≥ Elodea for 137 Cs + and 60 Co 2+ ; Spirulina > Porphiridium > Scenedesmus > Riccia > Pistia > Lemna > Elodea for 51 Cr 3+ . (author)

  12. Experience in integration of on-line control systems for turbine plants at the Ignalina and Zaporozhe NPPs

    International Nuclear Information System (INIS)

    Gapunin, A.Ya.; Guchshin, V.I.; Kozlov, N.Yu.; Kravtsov, V.F.; Rasskazov, I.Eh.; Fridman, P.Yu.

    1989-01-01

    The main stages of designing and improvement of turbine on-line control systems (TOCS) are considered. TOCS is mainly designed for the optimization of NPP equipment operation modes taking into account power system requirements, as well as reactor and steam generator capabilities. TOCS of the Ignalina (K750-65/1300 turbine) and Zaporozhe (K1000-60/1500-2) NPPs are the systems of the third generation and are produced in the form of decentralized complex of software and hardware on the basis of the Ehlektronika S5-2200 computer. 3 refs.; 2 figs

  13. Combined use of leaf size and economics traits allows direct comparison of hydrophyte and terrestrial herbaceous adaptive strategies.

    Science.gov (United States)

    Pierce, Simon; Brusa, Guido; Sartori, Matteo; Cerabolini, Bruno E L

    2012-04-01

    Hydrophytes generally exhibit highly acquisitive leaf economics. However, a range of growth forms is evident, from small, free-floating and rapidly growing Lemniden to large, broad-leaved Nymphaeiden, denoting variability in adaptive strategies. Traits used to classify adaptive strategies in terrestrial species, such as canopy height, are not applicable to hydrophytes. We hypothesize that hydrophyte leaf size traits and economics exhibit sufficient overlap with terrestrial species to allow a common classification of plant functional types, sensu Grime's CSR theory. Leaf morpho-functional traits were measured for 61 species from 47 water bodies in lowland continental, sub-alpine and alpine bioclimatic zones in southern Europe and compared against the full leaf economics spectrum and leaf size range of terrestrial herbs, and between hydrophyte growth forms. Hydrophytes differed in the ranges and mean values of traits compared with herbs, but principal components analysis (PCA) demonstrated that both groups shared axes of trait variability: PCA1 encompassed size variation (area and mass), and PCA2 ranged from relatively dense, carbon-rich leaves to nitrogen-rich leaves of high specific leaf area (SLA). Most growth forms exhibited trait syndromes directly equivalent to herbs classified as R adapted, although Nymphaeiden ranged between C and SR adaptation. Our findings support the hypothesis that hydrophyte adaptive strategy variation reflects fundamental trade-offs in economics and size that govern all plants, and that hydrophyte adaptive strategies can be directly compared with terrestrial species by combining leaf economics and size traits.

  14. The optimum energy harvest efficiency of nitrogen fixing hydrophyte: Azolla pinnata

    Energy Technology Data Exchange (ETDEWEB)

    Tennakone, K. (Institute of Fundamental Studies, Kandy (LK) Ruhuna Univ., Matara (LK). Dept. of Physics); Punchihewa, S.; Jayasuriya, A.C. (Institute of Fundamental Studies, Kandy (LK))

    1989-01-01

    Azolla is a nitrogen fixing hydrophyte that can be cultivated in absence of nitrogenous fertilizer. It is found that when biomass is continuously harvested from a culture of Azolla, solar energy can be converted at an optimum efficiency of 1.1%. (author).

  15. Appointment of Ignalina negotiator marred by intense political bickering

    Index Scriptorium Estoniae

    2008-01-01

    Aleksandras Abisala määrati Leedu valitsuse poolt läbirääkijaks Euroopa Komisjoniga. Abisala püüab tõestada, et Ignalina tuumajaama sulgemise probleem on terve Euroopa probleem. Mõned poliitikud pole rahul Abisala valimisega läbirääkijaks

  16. Elemental analysis of some ethnomedicinaly important hydrophytes and marsh plants of India used in traditional medicine

    Institute of Scientific and Technical Information of China (English)

    Somnath Bhowmik; Badal Kumar Datta

    2012-01-01

    Objective: To study the elemental content of some ethnomedicinaly important hydrophytes and marsh plant of Tripura, India. Methods: With the help of standardize d questionnaires, 10 informants were interviewed on the medicinal use of hydrophytes and marsh plants of Tripura, India during 2009-2010.The elemental content of those plants were determined using Atomic Absorption Spectrophotometer. Results: A total of 8 plant species belonging to 8 different genera and 8 family were reported with their ethnomedicinaly uses. Among the different plant part used leaves and young tender shoots are most frequently used for the treatment of different disease. The hydrophytes and marsh plants are mostly used for the treatment of dysentery and other hepatic disorder. Different elemental constituents at trace levels of plants play an effective role in the medicines prepared. Elemental composition of eight ethno-medicinally important hydrophytes and marsh plants of Tripura, India have been determined using Atomic Absorption Spectrophotometer (AAS). A total of 11 elements K+, Mg+2, Ca+2, Na+ , Fe+2, Mn+2, Cu+3, Mn+2, Cu+3, Cr+3, Zn+2, Pb+4 and Cd+2 have been measured. Their concentrations were found to vary in different samples. Toxic elements Cd and Pb were also found but at very low concentration. Medicinal properties of these plant samples and their elemental distribution have been correlated. These results can be used to set new standards for prescribing the dosage of the herbal drugs prepared from these plant materials in herbal remedies and in pharmaceutical companies. Conclusions: The data obtained in the present work will be useful in synthesis of new herbal drugs with various combinations of plants, which can be used in the treatment of different diseases at global level.

  17. The impact of Ignalina Nuclear Power Plant (INPP) effluents on fish

    International Nuclear Information System (INIS)

    Astrauskas, A.; Bernotas, E.; Didrikas, T.

    1997-01-01

    Successive changes of the ecosystems, censor structure and functioning in the cooling reservoir of the Ignalina NPP - lake Drukshiai are continuing so far. The plant working at full capacity, the territory of the lake due to thermogradient conditions is expanding considerably, not seldom exceeding the hygienic norms. Under such conditions the volume of cold water masses is notably decreasing, and the limit of temperature jump becomes lower. Changes and elimination of species in the ichtyocenosis of the lake are taking place, exceeding the rates typical to the development of natural water reservoirs. The pelagic fish populations were observed from 1979 till 1995. During fish population investigation hydroacoustic technique was applied. Research into the fish population structure and functioning discovered the existence of some adaptation processes.That is confirmed by the decrease of fish in the lake and natural habitat during the construction of the plant and first years of its exploitation. Besides, a partial restoration of the species is observed in the recent years. In some species, adaptive possibilities to not quite typical life conditions have been revealed (vendace), others practically became extinct (smelt), while still other species have properly adapted themselves to the changed life conditions and remained abundant (roach, silver bream, perch). (author). 17 refs., 9 figs

  18. Ignalina RBMK-1500 building capability in retaining radioactive releases

    International Nuclear Information System (INIS)

    Nilsson, Lars; Johansson, K.

    1993-01-01

    The Ignalina reactor building structures are capable of retaining substantial fractions of radioactive emissions from the fuel core, in those accident sequences where pressurization failure of structures can be averted by pressure relief arrangements. In stage 1 of the IBBA project it was demonstrated that enhanced retention of radioactive fission products within the plant can be achieved if natural convection is facilitated in the upper building compartments. In this report of stage 2 is discussed for which accident sequences the introduction of natural convection in combination with the existing forced convection ventilation and the accident localization system can improve the total safety of Ignalina 1-2. The purpose of this stage is to provide a basis for further review and more detailed studies of the natural convection concept, its benefits and disadvantages, and of the feasability to introduce the concept in existing plants

  19. Poola pole Ignalina plaane lukku löönud / Piotr Wozniak ; interv. Raimo Poom

    Index Scriptorium Estoniae

    Wozniak, Piotr

    2007-01-01

    Äsja laialisaadetud Poola valitsuse majandusministri sõnul soovib Poola olla Ignalina tuumaelektrijaama projektis aktiivne investor, st Poola soovib teatud osa selle kavandatavast võimsusest, minimaalselt 1000 MW. Meelis Atonen, Villu Reiljan ja Evelyn Sepp vastavad küsimusele, kas Ignalina suudab põlevkivienergiat asendada

  20. Competition from native hydrophytes reduces establishment and growth of invasive dense-flowered cordgrass (Spartina densiflora

    Directory of Open Access Journals (Sweden)

    Ahmed M. Abbas

    2015-10-01

    Full Text Available Experimental studies to determine the nature of ecological interactions between invasive and native species are necessary for conserving and restoring native species in impacted habitats. Theory predicts that species boundaries along environmental gradients are determined by physical factors in stressful environments and by competitive ability in benign environments, but little is known about the mechanisms by which hydrophytes exclude halophytes and the life history stage at which these mechanisms are able to operate. The ongoing invasion of the South American Spartina densiflora in European marshes is causing concern about potential impacts to native plants along the marsh salinity gradient, offering an opportunity to evaluate the mechanisms by which native hydrophytes may limit, or even prevent, the expansion of invasive halophytes. Our study compared S. densiflora seedling establishment with and without competition with Phragmites australis and Typha domingensis, two hydrophytes differing in clonal architecture. We hypothesized that seedlings of the stress tolerant S. densiflora would be out-competed by stands of P. australis and T. domingensis. Growth, survivorship, biomass patterns and foliar nutrient content were recorded in a common garden experiment to determine the effect of mature P. australis and T. domingensis on the growth and colonization of S. densiflora under fresh water conditions where invasion events are likely to occur. Mature P. australis stands prevented establishment of S. densiflora seedlings and T. domingensis reduced S. densiflora establishment by 38%. Seedlings grown with P. australis produced fewer than five short shoots and all plants died after ca. 2 yrs. Our results showed that direct competition, most likely for subterranean resources, was responsible for decreased growth rate and survivorship of S. densiflora. The presence of healthy stands of P. australis, and to some extent T. domingensis, along river channels

  1. Belene NPP

    International Nuclear Information System (INIS)

    Tsvetanov, P.

    1990-01-01

    The book presents the main results of the studies of the Bulgarian Academy of Sciences (BAS) on the construction of a new nuclear power plant at Belene on the Danube river. The programme of the studies comprises five areas: the socio-economic and energy development and the necessity of the commissioning; a technical project and design level of the equipment (safety, radioactivity control, waste disposal and economic efficiency of the power plant); the seismic properties of the construction site; the corresponding risk and design features of the plant; the ecological impacts of the NPP and public opinion. The studies in the different areas have been carried out by independent teams, fully responsible for the formulated topical conclusions. The general opinion of the BAS voiced in the book is that the construction of Belene NPP is not sufficiently substantiated and is considered unacceptable. 94 refs., 53 fig., 56 tabs. (R.Ts.)

  2. Ignalina plant licensing process, international co-operation and assistance

    International Nuclear Information System (INIS)

    Bystedt, P.

    1999-01-01

    The challenge for Lithuania as a country with regained independence was to perform a licensing review in a way never done before in the country and in a time schedule that was extremely short. The work included establishing of the licensing base, strengthening the regulatory authority and organising the technical support, establish and implement a safety improvement program, production of the safety case and review of the safety case, and to derive a conclusion regarding whether to issue a licence or not. This was to be done together with other tasks, such as implementation of modifications included in the safety improvement programme at Ignalina, implementation of a new storage for spent fuel and, most important of all, to manage the operational safety at the plant. The achievements are impressive seen in view of the point of start and in view of the time and resources that have been available. Lithuania has put forward a unique safety documentation of an RBMK reactor and presented an in-depth safety evaluation in full openness to Western experts, giving the unique possibility to compare the safety of the Ignalina reactors to Western standards. The co-operation that has been established between Lithuania and Western experts through different assistance programmes is of outmost value, for all involved parties. Co-operation should continue as one element of the challenges for the future

  3. Public opinion and acceptability in Lithuania: Swedish support to the visitors' centre at Ignalina NPP

    International Nuclear Information System (INIS)

    Medeliene, Diana; Alvers, Margareta

    1998-01-01

    As the visitors' centre receives over 500 visitors per month it could be very interesting to take advantage of this fact and organise a survey of public opinion. First there must be a questionnaire prepared to be filled by visitors to the INPP, people of different sex, age, profession and education, coming from different regions. If needed, the same questionnaire could be spread in the biggest towns of Lithuania and in those parts of the country which are far away from the plant. The objective of the survey is to examine people's opinion about the energy sector and the role and safety of the INPP as well as to find out what they think about the future of the energy sector and nuclear. Another important question is if there is enough information about the INPP and the safety improvements. The comparison of results can certainly give interesting statistical data and conclusions. On the basis of the results of the survey an action plan can be prepared as part of the Public Information Programme. The visitors' centre was established in 1995 with the financial support from EBRD's Nuclear Safety Account. Sweden was asked for assistance by the INPP a year later and we stepped in when the centre was already well equipped and manned. Still, a lot was missing and together we made a list of priorities. First of all we ordered high quality ITV-equipment. Cameras were installed in the control room, reactor hall, turbine hall and in waste storage. Through monitors at the centre the visitors can see, in colour, what is going on inside the plant. Video films for general public were badly needed and SiP contacted a young Lithuanian film producer living in Stockholm. Two films are made: about every day work at the plant and about safety improvements financed within SiP's assistance programme. One of the films will be shown at PIME. At the same time SSI, the Swedish Institute for Radiation Protection, made a commitment to support the information centre and ordered a video film about radiation. We have also engaged a consultant, Mr. Wahlberg, the former Information Manager from OKG. The visitors' centre needs a general strategy for the communication with the public and the exposition needs some improvements and additional investments. SiP will finance the purchase of a multimedia computer and a special software for young visitors will be developed in Lithuania. The four newest employees at the centre do not have so much experience and should get training in how to handle the contacts with the press and how to organize internal information. After discussions finalizing the first stage of the project we are ready for further commitments. SiP has even plans to support the information activities at the regulatory body, VATESI, and we will participate in the project supporting the Emergency Plan for Lithuania, together with the Swedish Radiation Protection Institute and Swedish Authority for Rescue Services. Emergency preparedness is an important task for the visitors' centre and it needs coordination with the regulatory body, the Ministry of Economy and other responsible authorities

  4. Nuclear Safety at the Ignalina NPP. Achievements and challenges. Proceedings of the international conference

    International Nuclear Information System (INIS)

    1999-01-01

    The International Conference was held on 8-9 April, 1999 in Vilnius. The aim of this conference - to offers specialists an excellent chance to get acquainted with Lithuania's experience and the work it has done in the area of nuclear safety. Also this conference will help to depoliticize the discussion of nuclear power plants

  5. Radiological characterization of the main circulation circuit of the 1st unit at Ignalina NPP

    International Nuclear Information System (INIS)

    Poskas, P.; Zujus, R.; Brazauskaite, A. and others

    2003-01-01

    A preliminary assessment of the main circulation circuit (MCC) equipment contamination at the reactor final shut-down and analysis of the contamination variation with time are presented. In order to perform this assessment, data on MCC element characteristics, the coolant characteristics, the system operational conditions, etc. were collected. The modified computer code LLWAA-DECOM (Belgium) was used to determine contamination of the system elements. As a result, nuclide vectors and surface dose rates of deposits for every MCC element were determined. The modeling results were compared to the measurement results of the dose rates. (author)

  6. Audit calculations of accidents analysis for second unit of Ignalina NPP with ATHLET code

    International Nuclear Information System (INIS)

    Adomavicius, A.; Belousov, A.; Ognerubov, V.

    2004-01-01

    Background of thermo hydraulic processes audit calculations in the frame of RSR-2 project is presented. Assumptions for the design based accident - RBMK-1500 group distributor header break analysis and modeling are presented. Audit calculations by ATHLET code and evaluation of results were provided. (author)

  7. Accumulation and transfer of 137Cs and 90Sr in the plants of the forest ecosystem near the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Lukšienė, B.; Marčiulionienė, D.; Gudelienė, I.; Schönhofer, F.

    2013-01-01

    The radioecological state of the forest ecosystem in the vicinity of the Ignalina Power Plant prior to decommissioning was analysed with specific emphasis on 137 Cs and 90 Sr activity concentrations in plant species growing in two reference sampling sites (Tilze and Grikiniskes). In the period of 1996–2008 the mean contamination of plants with 137 Cs was from 45 to 119 Bq/kg and with 90 Sr – from 3 to 42 Bq/kg. Measured 137 Cs TF values for soil-root transfer mainly ranged between 1.0–1.4, except for Calamagrostis arundinacea which had a TF value of 0.1. On average, the 137 Cs TF value from root to shoot was 1.7 fold higher than for soil to root transfer. 90 Sr TF values (soil-root) were in the range of 1.2–1.8 but for Calluna vulgaris it was 0.2. The mean root to shoot TF value for 90 Sr was 7.7 fold higher. These results indicate the higher 90 Sr bioavailability than that of 137 Cs in the forested area. The Grikiniskes reference site is located nearby the Ignalina NPP, specifically the heated water outlet channel, which results in altered microclimatic conditions. These specific microclimatic conditions result in relationships between 137 Cs TF (soil-root) values and pH, moisture and organic matter content in the soil at Grikiniskes which appear to be different to those at the Tilze reference sampling site. - Highlights: ► The state of the forest ecosystem prior to decommissioning of the NPP was analysed. ► Results indicate the higher 90 Sr bioavailability than that of 137 Cs. ► Contribution of 137 Cs of different origin in plants was calculated.

  8. Adamkus : EU might be willing to negotiate on postponing Ignalina reactor closure

    Index Scriptorium Estoniae

    2008-01-01

    President Valdas Adamkus teatas võimalusest, et EL alustab arutelu Ignalina tuumaelektrijaama sulgemise edasilükkamisest. Uue jaama valmimise aeg pole teada ning praegune reaktor on tänu rootslaste abile turvaline

  9. Angiosperms, Hydrophytes of five ephemeral lakes of Thiruvallur District, Tamil Nadu, India

    Directory of Open Access Journals (Sweden)

    Udayakumar, M.

    2010-01-01

    Full Text Available The aim of this study was to document the Angiosperm diversity of five ephemeral lakes of ThiruvallurDistrict of Tamil Nadu South India. Qualitative floristic surveys were carried out during 2005-2007. Herbarium specimenswith voucher number, taxonomical and ecological information were deposited to the herbarium, Pachaiyappa’s College(PCH Chennai, Tamilnadu. Forty five species of hydrophytes belonging to 21 families and 34 genera were documented.Most speciose families were Poaceae with 5 species followed by Polygalaceae and Nymphaeaceae (4 Cyperaceae,Hydrocharitaceae, Najadaceae, and Scrophulariaceae (3 species each. Mean depth of all five lakes shrinking gradually dueto severe anthropogenic pressure. Conservation of wetlands is the need of the hour to protect the biota as well as quality ofdrinking water.

  10. The environmental impact of the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Drizius, R.; Jasiulionis, R.; Marciulioniene, D.

    1991-01-01

    In the course of design and initial operation of the nuclear power plant in Ignalina several research institutes of the Lithuanian Academy of Sciences performed monitoring measurements in the surroundings and accumulated data on the natural situation with a special interest in the environmental impact of the plant. The ecosystem of lake Druksiai as the cooling pond of the plant was expected to be influenced most. At present sufficient results have been accumulated to conclude a shift from natural equilibrium of the lake ecosystem in spite of the absence of any specific cases of severing the present nature-protecting legislation. At present the lake is an example of a transient environmental system because of the high inertia in most of the natural processes and because certain natural components are known to accumlate the products of release and to transform them. (author)

  11. Uptake and subcellular distribution of triclosan in typical hydrophytes under hydroponic conditions.

    Science.gov (United States)

    He, Yupeng; Nie, Enguang; Li, Chengming; Ye, Qingfu; Wang, Haiyan

    2017-01-01

    The increasing discharge of pharmaceuticals and personal care products (PPCPs) into the environment has generated serious public concern. The recent awareness of the environmental impact of this emerging class of pollutants and their potential adverse effects on human health have been documented in many reports. However, information regarding uptake and intracellular distribution of PPCPs in hydrophytes under hydroponic conditions, and potential human exposure is very limited. A laboratory experiment was conducted using 14 C-labeled triclosan (TCS) to investigate uptake and distribution of TCS in six aquatic plants (water spinach, purple perilla, cress, penny grass, cane shoot, and rice), and the subcellular distribution of 14 C-TCS was determined in these plants. The results showed that the uptake and removal rate of TCS from nutrient solution by hydrophytes followed the order of cress (96%) > water spinach (94%) > penny grass (87%) > cane shoot (84%) > purple perilla (78%) > rice (63%) at the end of incubation period (192 h). The range of 14 C-TCS content in the roots was 94.3%-99.0% of the added 14 C-TCS, and the concentrations in roots were 2-3 orders of magnitude greater than those in shoots. Furthermore, the subcellular fraction-concentration factor (3.6 × 10 2 -2.6 × 10 3  mL g -1 ), concentration (0.58-4.47 μg g -1 ), and percentage (30%-61%) of 14 C-TCS in organelles were found predominantly greater than those in cell walls and/or cytoplasm. These results indicate that for these plants, the roots are the primary storage for TCS, and within plant cells organelles are the major domains for TCS accumulation. These findings provide a better understanding of translocation and accumulation of TCS in aquatic plants at the cellular level, which is valuable for environmental and human health assessments of TCS. Copyright © 2016 Elsevier Ltd. All rights reserved.

  12. Decommissioning of NPP A-1

    International Nuclear Information System (INIS)

    Anon

    2009-01-01

    In this presentation the Operation history of A1 NPP, Project 'Decommissioning of A1 NPP' - I stage, Project 'Decommissioning of A1 NPP ' - II stage and Next stages of Project 'Decommissioning of A1 NPP ' are discussed.

  13. Mochovce NPP simulator

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Mochovce NPP simulator basic features and detailed description of its characteristics are presented with its performance, certification and application for training of NPP operators as well as the training scenario

  14. Accumulation and transfer of 137Cs and 90Sr in the plants of the forest ecosystem near the Ignalina Nuclear Power Plant.

    Science.gov (United States)

    Lukšienė, B; Marčiulionienė, D; Gudelienė, I; Schönhofer, F

    2013-02-01

    The radioecological state of the forest ecosystem in the vicinity of the Ignalina Power Plant prior to decommissioning was analysed with specific emphasis on (137)Cs and (90)Sr activity concentrations in plant species growing in two reference sampling sites (Tilze and Grikiniskes). In the period of 1996-2008 the mean contamination of plants with (137)Cs was from 45 to 119 Bq/kg and with (90)Sr - from 3 to 42 Bq/kg. Measured (137)Cs TF values for soil-root transfer mainly ranged between 1.0-1.4, except for Calamagrostis arundinacea which had a TF value of 0.1. On average, the (137)Cs TF value from root to shoot was 1.7 fold higher than for soil to root transfer. (90)Sr TF values (soil-root) were in the range of 1.2-1.8 but for Calluna vulgaris it was 0.2. The mean root to shoot TF value for (90)Sr was 7.7 fold higher. These results indicate the higher (90)Sr bioavailability than that of (137)Cs in the forested area. The Grikiniskes reference site is located nearby the Ignalina NPP, specifically the heated water outlet channel, which results in altered microclimatic conditions. These specific microclimatic conditions result in relationships between (137)Cs TF (soil-root) values and pH, moisture and organic matter content in the soil at Grikiniskes which appear to be different to those at the Tilze reference sampling site. Copyright © 2012 Elsevier Ltd. All rights reserved.

  15. Parametric study of the Ignalina reactor building capability as barrier against accidental releases of radioactivity

    International Nuclear Information System (INIS)

    Blomquist, R.; Johansson, Kjell; Nilsson, Lars.

    1993-01-01

    The results of a parametric study are offered to the Ignalina plant management staff and to the Lithuanian and Swedish nuclear inspectorates as a basis for a decision whether there is mutual interest in a project for the purpose of strengthening the Ignalina reactor buildings inherent capabilities to provide a barrier against accidental releases of radioactivity. Practical measures to consider are: * establish natural convection of warm air from the steam drums to the tall stack of 150 m height. * reduce the resulting draught of air through the reactor hall floor between the fuel channel shield blocks into the steam drum compartments. * apply filtration to the stack air flow. 18 refs

  16. Polish media and public opinion on NPP Mochovce commissioning

    International Nuclear Information System (INIS)

    Latek, Stanislaw

    1999-01-01

    Polish press is very much changed. The author of the article titled: 'Off with Mochovce' printed last spring, on December 1998 published a large story titled 'A circle of reactors', in which she writes of Mochovce with sympathetic understanding and calls it 'modern Mochovce.' It should be noted, that the change of mind of this quoted author could be influenced by two occurrences: the full acceptance of the Mochovce NPP by the new Slovak government and the fact, that this author recently participated in the visit of a group of Polish journalists to Ignalina NPP in Lithuaniaand is convinced that the personal viewing of the nuclear installation and the talks conducted there, especially with the inhabitants of Visaginas (neighbouring NPP), who are in everyday contact with nuclear power plant, were essential in shaping a more friendly and more open attitude of media representatives towards nuclear power

  17. Seismic alarm system for Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Wieland, M.; Griesser, L.; Austin, G.E.; Tiurin, S.; Kuendig, C.

    2001-01-01

    A seismic alarm system will be installed at the Ignalina Nuclear Power Plant (INPP) in Lithuania. There are two reactors, both RMBK 1500 MW units. Each reactor is a water cooled, graphite moderated, channel type reactor. INPP has the most advanced version of the RMBK reactor design series. The first and second units of INPP went into service at the end of 1983 and in August 1987 respectively. Their design lifetime is approx. 30 years. The various buildings and plant have been designed for two earthquake levels, that is the design earthquake and the maximum possible earthquake with peak ground accelerations ranging from 1.2% to 10% of the acceleration due to gravity. Certain parts of the buildings and some of the equipment of the first and second units do not comply with Western seismic standards. As seismic strengthening of the existing buildings and equipment is not feasible economically, a reactor protection system based on an earthquake early warning system was recommended. This system essentially consists of six seismic stations encircling INPP at a radial distance of approx. 30 km and a seventh station at INPP. Each station includes three seismic substations each 500 m apart. The ground motion at each station is measured continuously by three accelerometers and one seismometer. Data is transmitted via telemetry to the control centre at INPP. Early warning alarms are generated if a seismic threshold is exceeded. This paper discusses the characteristics of INPP, the seismic alarm system presently under construction and the experience with other early warning and seismic alarm systems. (author)

  18. Edgar Savisaar : Ignalina on arvestatav projekt / Edgar Savisaar ; interv. Mikk Salu

    Index Scriptorium Estoniae

    Savisaar, Edgar, 1950-

    2006-01-01

    Majandus- ja kommunikatsiooniminister Edgar Savisaar vastab küsimustele, mis puudutavad poliitilist protsessi Ignalina uue tuumajaama ehitamise küsimuses, poliitiliste otsuste ajakava ja vormi, majandusministeeriumi koostööd Läti ja Leedu kolleegidega selles küsimuses, energeetilist sõltumatust ja lobitööd tuuleenergia teemal

  19. Decommissioning of Brennilis NPP

    International Nuclear Information System (INIS)

    Baize, Jean-Marc

    1998-01-01

    This EDF press communique give information related to the decommissioning of the Brennilis NPP. The following five items are developed in this report: 1. the level-2 decommissioning operations at the Brennilis NPP; 2. the Brennilis NPP, a pilot operation from the commissioning up to the decommissioning; 3. history of the Brennilis NPP decommissioning; 4. the types of radioactive wastes generated by the Brennilis NPP decommissioning; 5. the Brennilis NPP - a yard management as a function of the wastes. The document contains also seven appendices addressing the following subjects: 1. the share of decommissioning assigned to EDF and the decommissioning steps; 2. the EDF installations in course of decommissioning; 3. the CEA decommissioned installations or in course of decommissioning; 4. regulations; 5. costs; 6. waste management - principles; 7. data on the decommissioning yard

  20. NPP life management (abstracts)

    International Nuclear Information System (INIS)

    Litvinskij, L.L.; Barbashev, S.V.

    2002-01-01

    Abstracts of the papers presented at the International conference of the Ukrainian Nuclear Society 'NPP Life Management'. The following problems are considered: modernization of the NPP; NPP life management; waste and spent nuclear fuel management; decommissioning issues; control systems (including radiation and ecological control systems); information and control systems; legal and regulatory framework. State nuclear regulatory control; PR in nuclear power; training of personnel; economics of nuclear power engineering

  1. A fire hazard analysis at the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Joerud, F.; Magnusson, T.

    1998-01-01

    The fire hazard analysis (FHA) of the Ignalina Nuclear Power Plant (INPP) Unit no.1 was initiated during 1997 and is estimated to finalise in summer 1998. The reason for starting a FHA was a recommendation in the Safety Analysis Report and its review to prioritise a systematic FHA. Fire protection improvements had earlier been based on engineering assessments, but further improvements required a systematic FHA. It is also required by the regulator for licensing of unit no.1. In preparation of the analysis it was decided to perform a deterministic FHA to fulfil the requirements in the IAEA draft of a Safety Practice ''Preparation of Fire Hazard Analyses for Nuclear Power Plants''. As a supporting document the United States Department of Energy Reactor Core Protection Evaluation Methodology for Fires at RBMK and WWER Nuclear Power Plants (RCPEM) was agreed to be used. The assistance of the project is performed as a bilateral activity between Sweden and UK. The project management is the responsibility of the INPP. In order to transfer knowledge to the INPP project group, training activities are arranged by the western team. The project will be documented as a safety case. The project consists of parties from INPP, Sweden, UK and Russia which makes the project very dependent of good communication procedures. The most difficult problems is except from the problems with translation, the problems with different standards and lack of testing protocols of the fire protection installations and problems to set the right level of screening criteria. There is also the new dimension of making it possible to take credit for the fire brigade in the safety case, which can bring the project into difficulties. The most interesting challenges for the project are to set the most sensible safety levels in the screening phase, to handle the huge volume of rooms for survey and screening, to maintain the good exchange of fire- and nuclear safety information between all the parties involved

  2. Safety assessment of proposed modifications of Ignalina nuclear power plant. A publication of the extrabudgetary programme on the safety of WWER and RBMK nuclear power plants

    International Nuclear Information System (INIS)

    1995-09-01

    The objective of the meeting was to further discuss previous findings and recommendations and their application to the particular situation of the Ignalina NPP. Since design information and a series of proposed modifications for INPP had been prepared by the main RBMK designer, Research and Development Institute for Power Engineering (RDIPE), it was considered appropriate to conduct the meeting in two parts, the first from 17 to 22 October 1994, at RDIPE headquarters in Moscow and the second from 24 to 28 October 1994, at the plant site in Lithuania. Twelve international experts and IAEA staff participated in the meetings, together with a large group of RDIPE specialists and plant staff. The review covered five topical areas: core monitoring and control; pressure boundary integrity; accident migration; safety and support systems and instrumentation and control. A summary of the reviews in each technical areas is given in this report. Appendices 1 and 5 present the records of the reviews and detailed findings and recommendations in each topical area. The experts strongly supported the effort to develop a new extended safety analysis report. They also stressed the need for close monitoring of the fuel channel conditions and the need for an integrated approach for the upgrading of the control and safety systems. Refs, figs, tabs

  3. Experience of Bohunice V-1 NPP

    International Nuclear Information System (INIS)

    Dobik, Dobroslav

    2000-01-01

    Slovakia remains significantly dependent on imports of primary energy sources, which represent as much as 80% of the demand. Of the total consumption of electricity in Slovakia, 40% was generated in nuclear power plant units in 1998. Slovakia operates 6 units with WWER 440 nuclear reactors. Slovakia is the signatory of all important international agreements and conventions in the field of nuclear energy, and its legislation is in an advanced stage of approximation to European Union law. This is a very important aspect, showing Slovakia's approach to nuclear safety. In 1993 Slovakia accepted the commitments of the UN Convention on Climate Changes, including a reduction of greenhouse gases to 1990 levels by the year 2000. Moreover, as an internal target Slovakia has set the reaching of the 'Toronto Objective', i.e. 20% reduction in CO x , emissions through the year 2005 as compared to 1988. In our opinion, this is not possible without nuclear energy. Time has shown, that the political aspects are more powerful, especially if you underestimate their importance over the than the technical ones. In the case of Bohunice V-1 NPP the political aspects were on the following levels: 1. Slovak republic (Czechoslovakia), political changes, decisions of the government; 2. European Union - Agenda 2000, Accession criteria, nuclear safety criteria, EBRD; 3. Austria as a neighbouring country. Starting with year 1990, 23 expert missions took place at Bohunice V-1 NPP by now. The only criteria for further operation should have been Nuclear safety, which is supervised by NRA SR. It was fully in compliance with EU policy, each country is solely responsible for its energy sector and for nuclear energy use. Our satisfaction lasted not too long. Following negotiation with EU on the highest political level, driven by willingness to be invited for negotiation of accession on the Helsinki Summit, the Slovak government decided on September 14th, on Bohunice V-1 Units shutdown in 2006 and 2008

  4. NPP service life management

    International Nuclear Information System (INIS)

    Elagin, Yu.P.

    2001-01-01

    Problems of NPP service life management and service life prolongation are reviewed. Methods for the prolongation of the French NPP service life are discussed, priority directions of nuclear block service life management in regard to aging in the context of the European program of investigation into the materials aging are identified. Questions of the provision of the 60 years service life of the Mihama 1 block (Japan) and decision of the problem of the control equipment aging in Great Britain are discussed. Situation with the prolongation of licenses on the NPP operation in the USA and Spain is considered [ru

  5. Chromosome aberrations in workers of ignalina nuclear power plant

    Energy Technology Data Exchange (ETDEWEB)

    Griciene, B.; Januskeviciute, I.; Mierauskiene, J.; Slapsyte, G. [Vilnius Univ. (Lithuania)

    2006-07-01

    Full text of publication follows: The Ignalina Nuclear Power Plant (I.N.P.P.) workers and outside workers including visitors constitute the largest occupational group exposed to low doses of ionizing radiation in Lithuania. In 2004, the annual collective dose to these workers (4392 persons) was 6,83 man Sv. The maximum annual individual dose of I.N.P.P. workers was 19,16 mSv, and of outside workers was 29,41 mSv. However, according to calculations performed by the Lithuanian Radiation Protection Centre, the decommissioning of I.N.P.P. (the I.N.P.P. is to be shut down by 2009) will result in collective dose of 35 man Sv. Therefore, a special attention should be given to implementation of radiation protection programme. The importance of cytogenetic studies in the medical surveillance of radiation-exposed persons is generally acknowledged. The aim of the present study was to analyse chromosome aberration frequencies in lymphocytes of I.N.P.P. workers. The blood sampling of 27 male workers was performed in October 2004, after planned outage of I.N.P.P.. It was estimated that outages of I.N.P.P. Units contributed 84% to all annual occupational collective dose. Average cumulative dose of 18 workers was 290,7 mSv (group A), and of 9 workers - 71,7 mSv (group B). The mean annual doses averaged over the three-year-period were 15,2 mSv and 0,76 mSv, respectively. None of the exposed workers had ever exceeded the permissible dose limit. The average age of group A workers was 45,2 years, and group B 48,2 years. A questionnaire form with details on age, occupational history, smoking habit and alcohol intake, medication, history of recent illness was completed for each person at the time of blood collection. 64 non-exposed male donors approximately matched by age were used as controls (group C). Heparinized venous blood samples were taken and cultures were initiated within 24 h according to the standard procedures. At least 500 first cycle metaphases were analysed from each

  6. Chromosome aberrations in workers of ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Griciene, B.; Januskeviciute, I.; Mierauskiene, J.; Slapsyte, G.

    2006-01-01

    Full text of publication follows: The Ignalina Nuclear Power Plant (I.N.P.P.) workers and outside workers including visitors constitute the largest occupational group exposed to low doses of ionizing radiation in Lithuania. In 2004, the annual collective dose to these workers (4392 persons) was 6,83 man Sv. The maximum annual individual dose of I.N.P.P. workers was 19,16 mSv, and of outside workers was 29,41 mSv. However, according to calculations performed by the Lithuanian Radiation Protection Centre, the decommissioning of I.N.P.P. (the I.N.P.P. is to be shut down by 2009) will result in collective dose of 35 man Sv. Therefore, a special attention should be given to implementation of radiation protection programme. The importance of cytogenetic studies in the medical surveillance of radiation-exposed persons is generally acknowledged. The aim of the present study was to analyse chromosome aberration frequencies in lymphocytes of I.N.P.P. workers. The blood sampling of 27 male workers was performed in October 2004, after planned outage of I.N.P.P.. It was estimated that outages of I.N.P.P. Units contributed 84% to all annual occupational collective dose. Average cumulative dose of 18 workers was 290,7 mSv (group A), and of 9 workers - 71,7 mSv (group B). The mean annual doses averaged over the three-year-period were 15,2 mSv and 0,76 mSv, respectively. None of the exposed workers had ever exceeded the permissible dose limit. The average age of group A workers was 45,2 years, and group B 48,2 years. A questionnaire form with details on age, occupational history, smoking habit and alcohol intake, medication, history of recent illness was completed for each person at the time of blood collection. 64 non-exposed male donors approximately matched by age were used as controls (group C). Heparinized venous blood samples were taken and cultures were initiated within 24 h according to the standard procedures. At least 500 first cycle metaphases were analysed from each

  7. Hydrology of lake Druksiai, the cooling pond of the Ignalina nuclear plant

    International Nuclear Information System (INIS)

    Lasinskas, M.

    1994-01-01

    The article presents the data on the water balance in lake Druksiai and evaluation of data on surface evaporation, surface temperature distribution, hydrothermal behaviour and water level variations under the influence of the Ignalina Nuclear Power Plant. A list is supplied of reports on the studies of hydrology in lake Druksiai, as well as of books and journal articles containing the results of studies of the lake. (author). 51 refs., 3 tabs., 10 figs

  8. Comparison of the N Reactor and Ignalina Unit No. 2 Level 1 Probabilistic Safety Assessments

    International Nuclear Information System (INIS)

    Coles, G.A.; McKay, S.L.

    1995-06-01

    A multilateral team recently completed a full-scope Level 1 Probabilistic Safety Assessment (PSA) on the Ignalina Unit No. 2 reactor plant in Lithuania. This allows comparison of results to those of the PSA for the U.S. Department of Energy's (DOE) N Reactor. The N Reactor, although unique as a Western design, has similarities to Eastern European and Soviet graphite block reactors

  9. Water chemistry of Ignalina NPP. Optimisation of purification system and non-reagent decontamination of Primary cooling system

    International Nuclear Information System (INIS)

    Oryshaka, A.; Safronov, V.

    2002-01-01

    Modifications implemented at Ignalice nuclear power plant are not expensive, however their performance resulted in the following: 1. Improvement of coolant quality, 2. Cost reduction for reagents and ion-exchange resin, 3. Significant decrease of the amount of liquid radioactive wastes (more than twice), 4. Improvement of equipment reliability and reduction of water chemistry impact to the IGSCC in downcomers. (authors)

  10. Water chemistry of Ignalina NPP. Optimisation of purification system and non-reagent decontamination of Primary cooling system

    Energy Technology Data Exchange (ETDEWEB)

    Oryshaka, A.; Safronov, V. [Ignalina NPP (Lithuania)

    2002-07-01

    Modifications implemented at Ignalice nuclear power plant are not expensive, however their performance resulted in the following: 1. Improvement of coolant quality, 2. Cost reduction for reagents and ion-exchange resin, 3. Significant decrease of the amount of liquid radioactive wastes (more than twice), 4. Improvement of equipment reliability and reduction of water chemistry impact to the IGSCC in downcomers. (authors)

  11. Dynamic reliability and risk assessment of the accident localization system of the Ignalina NPP RBMK-1500 reactor

    International Nuclear Information System (INIS)

    Kopustinskas, V.; Augutis, J.; Rimkevicius, S.

    2005-01-01

    The paper presents reliability and risk analysis of the RBMK-1500 reactor accident localization system (ALS) (confinement), which prevents radioactive releases to the environment. Reliability of the system was estimated and compared by two methods: the conventional fault tree method and an innovative dynamic reliability model, based on stochastic differential equations. Frequency of radioactive release through ALS was also estimated. The results of the study indicate that conventional fault tree modeling techniques in this case apply high degree of conservatism in the system reliability estimates. One of the purposes of the ALS reliability study was to demonstrate advantages of the dynamic reliability analysis against the conventional fault/event tree methods. The Markovian framework to deal with dynamic aspects of system behavior is presented. Although not analyzed in detail, the framework is also capable of accounting for non-constant component failure rates. Computational methods are proposed to solve stochastic differential equations, including analytical solution, which is possible only for relatively small and simple systems. Other numerical methods, like Monte Carlo and numerical schemes of differential equations are analyzed and compared. The study is finalized with concluding remarks regarding both the studied system reliability and computational methods used

  12. Changes of reproductive system of pike Esox Lucius L. in lake Drukshiai -the cooler of Ignalina NPP

    International Nuclear Information System (INIS)

    Lukshiene, D.

    1995-01-01

    On studying the reproductive system of pike in lake Drukshiai during 1992-1994 the same changes in fish gameto- and gonadogenesis as in other coolers were observed: -intensification of gametogenesis processes - earlier sexual maturity; -changes in gonadogenesis processes - a bias of all stages of sexual cycle as well as a change in duration; -disturbance of gametogenesis processes - total and partial degeneration of oocytes causing the disturbance of reproduction cycle what is reflected in the changes of some biological indices (gonadosomatic index and oocyte diameter). The above mentioned disturbances have a negative effect on normal functioning and reproduction of a pike population. (author). 8 refs., 2 figs

  13. Use RUSLE2 model to assess the impact of soil erosion on playa inundation and hydrophyte conditions in the Rainwater Basin, Nebraska.

    Science.gov (United States)

    Tang, Zhenghong; Gu, Yue; Jiang, Weiguo; Xue, Yuan; Bishop, Andy; LaGrange, Ted; Nugent, Eleanor

    2016-06-01

    Playas in the Rainwater Basin region in Nebraska are globally important wetlands that are continuously threatened by culturally accelerated sedimentation. Using annual habitat survey data and wetland vegetation inventories, inundation and hydrophyte community distributions were evaluated for properties under different types of conservation status. Annual soil erosion rates from surrounding watersheds were calculated to estimate sediment accumulated rates using the Revised Universal Soil Loss Equation 2 (RUSLE2). The slope-length component of the RUSLE2 was derived from 2009 light detection and ranging (LiDAR) data after the methods described by Van Remortel (Computers & Geosciences 30:1043-1053, 2004). Wetlands enrolled in conservation programs were inundated more and were dominated to a greater degree by hydrophytes than wetlands not enrolled in these programs. The mean estimated soil erosion rate at the Rainwater Basin landscape level was 4.67 tons/ha/year, and the mean estimated sediment accumulation depth for public watersheds was estimated as 0.19 cm/year. Without appropriate conservation actions, the current inundated acres and wetland acres growing hydrophytes would be further reduced by sediment accumulation. The results illustrated the importance of conservation programs to protect wetlands.

  14. EMAS at Doel NPP

    International Nuclear Information System (INIS)

    Nolan, Peter; Thoelen, Els

    1998-01-01

    In October 1995, Doel NPP of Electrabel, Belgium opted to seek registration under the EC Eco-management and Audit Scheme (EMAS). A comprehensive environmental management system (EMS) has been introduced and implemented, encompassing all four PWRs and the supporting departments. A critical step was to seek certification from an accredited environmental auditing body against the International Standard ISO 14001. This provided the foundation for the publicly available environmental statement required by EMAS. The complications of achieving EMAS at a time when national and international standards were being re-formulated were successfully overcome and Doel NPP passed its EMAS audit in June 1997. (author)

  15. Insights into the structural and physicochemical properties of small granular starches from two hydrophyte duckweeds, Spirodela oligorrhiza and Lemna minor.

    Science.gov (United States)

    Chen, Lei; Yu, Changjiang; Ma, Yubin; Xu, Hua; Wang, Shumin; Wang, Yu; Liu, Xingxun; Zhou, Gongke

    2016-11-29

    The structure and physicochemical properties of starches from two hydrophyte duckweeds, Spirodela oligorrhiza and Lemna minor, were investigated and compared in this study. The amylose content and average size of starches were determined to be 20.85%, 4.70 μm and 27.77%, 6.17 μm for Spirodela oligorrhiza and Lemna minor, respectively. The average chain length of two duckweed starches was measured to be around DP 28. The chain length distribution was observed to be greatly different from other reported starches for the high proportion of long chains (DP ≥ 37) over 50%. Wide-angle X-ray diffraction profiles of the two starch samples displayed typical B-type diffraction pattern. The gelatinization enthalpy-changes (ΔH gel ) of two starch samples was about 10.40 J/g for two duckweed starches. The present results suggested the potential utilization of small granular starches from duckweed in functional foods and dietary supplement products. Copyright © 2016 Elsevier Ltd. All rights reserved.

  16. Temelin NPP commissioning experiences

    International Nuclear Information System (INIS)

    Hanus, V.

    2002-01-01

    The Building Permit for the Temelin NPP with four VVER units was issued in 1986, which is a long time ago. Since then, however, was taken a route that is very different from what anybody imagined. Described are the legislative and design changes and given is a current condition of the power plant

  17. Dukovany NPP maintenance management

    International Nuclear Information System (INIS)

    Siegel, F.

    2005-01-01

    Maintenance planning and management for the technological equipment of the Dukovany NPP are described. A Maintenance Control and Evaluation System has been developed and is in use to help manage the complex maintenance issue. Practical examples of outputs of the System, with a comprehensive use of the cost, reliability and safety related data, are presented. (author)

  18. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP KRSKO. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and the results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economical aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling all activities necessary for the decommissioning of the NPP KRSKO are presented. (author)

  19. NPP Krsko decommissioning concept

    International Nuclear Information System (INIS)

    Novsak, M.; Fink, K.; Spiler, J.

    1996-01-01

    At the end of the operational lifetime of a nuclear power plant (NPP) it is necessary to take measures for the decommissioning as stated in different international regulations and also in the national Slovenian law. Based on these requirements Slovenian authorities requested the development of a site specific decommissioning plan for the NPP Krsko. In September 1995, the Nuklearna Elektrarna Krsko (NEK) developed a site specific scope and content for a decommissioning plan including the assumptions for determination of the decommissioning costs. The NEK Decommissioning Plan contains sufficient information to fulfill the decommissioning requirements identified by NRC, IAEA and OECD - NEA regulations. In this paper the activities and results of development of NEK Decommissioning Plan consisting of the development of three decommissioning strategies for the NPP Krsko and selection of the most suitable strategy based on site specific, social, technical, radiological and economic aspects, cost estimates for the strategies including the costs for construction of final disposal facilities for fuel/high level waste (fuel/HLW) and low/intermediate level waste (LLW/ILW) and scheduling of all activities necessary for the decommissioning of the NPP Krsko are presented. (author)

  20. Two managerial grids in NPP

    International Nuclear Information System (INIS)

    Zhao Hui

    2012-01-01

    Today, the nuclear power corporation (NPC) enjoys the profit of LCEP (the low carbon economic policy). at the same time, they also enduring more and more pressure. For example, the partner competition or the NPP potential occupational risk . The efficient counterplot of risk is the self-ability cultivation. It is essential to research the NPP managerial flow. The nuclear power plant (NPP) unit is a carrier of the NPC enterprise management system, and has taken on a new look 'pull one portion then the whole moving'. The NPP has three systematical characters, the security responsibility center, the man-machine system and the input-output system. The manufacturing system and the enterprise management system are the great constituents of the NPP managerial flows. Means of systems analysis, we can find out the truth of the NPP running interface. In CHINA, there are many operating experiences near 20 years. It indicates that the NPP manufacturing system and the enterprise system are the roots of the nuclear power corporation, the core of the all NPP systems must be based on it. So the ability cultivation is the work core to NPP. It is reliably to ensure the NPP to be up against problems, for instance, the security duty, the costing control and the man-machine system running harmoniously. This paper introduces the NPP managerial flow and the present state of QNPC, also come up with a proposal to refer for the NPC development actions of collective measure, specialization, standardization, fine. (author)

  1. Law on the Decommissioning of unit 1 at the state enterprise of the Republic of Lithuania Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    2000-01-01

    This law regulates the legal principles for the decommissioning of unit 1 at the Ignalina Nuclear Power Plant. The main deadlines for the government in the preparation for the decommissioning are set in the law. All preparatory works should be finished before the year 2005

  2. The Barselina Project Phase 4 Summary report. Ignalina Unit 2 Probabilistic Safety Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Johansson, Gunnar [ES-Konsult AB, Stockholm (Sweden); Hellstroem, P. [RELCON AB, Solna (Sweden); Zheltobriuch, G.; Bagdonas, A. [Ignalina Power Plant, Visaginas (Lithuania)

    1996-12-01

    The Barselina Project was initiated in the summer of 1991. The project is a multilateral co-operation between Lithuania, Russia and Sweden. The long range objective is to establish common perspectives and unified bases for assessment of severe accident risks and needs for remedial measures for the RBMK reactors. The Swedish BWR Barsebaeck is used as reference plant and the Lithuanian RBMK Ignalina as application plant. During phase 3, from March, 1993 to June, 1994, a full scope Probabilistic Safety Analysis (PSA) model of the Ignalina Nuclear Power Plant unit 2 (INPP-2) was developed to identify possible safety improvement of risk importance. The probabilistic methodology was applied on a plant specific basis for a channel type reactor of RBMK design. To increase the realism of the risk model a set of deterministic analyses were performed and plant/RBMK-specific data bases were developed and used. A general concept for analysing this type of reactor was developed. During phase 4, July 1994 to September 1996, the PSA was further developed, taking into account plant changes, improved modeling methods and extended plant information concerning dependencies (area events, dynamic effects, electrical and signal dependencies). The updated model is quantified and new results and conclusions are evaluated.

  3. Dukovany NPP operation

    International Nuclear Information System (INIS)

    Vlcek, Jaroslav

    2010-01-01

    The topics discussed include: Dukovany NPP among CEZ Group power plants; International missions at the plant; Plant operation results; and Strategic goals and challenges. Historical data are presented in the graphical form, such as the unit capacity factor, unplanned capability loss factor, unplanned automatic scrams, fuel reliability, industrial safety accident rate, collective radiation exposure, WANO index, power generation data, and maximum achievable power by the end of year. Also discussed were the company culture and human resources, maintenance, power uprate, and related phenomena. (P.A.)

  4. Cernavoda NPP Knowledge Transfer

    International Nuclear Information System (INIS)

    Valache, C. M.

    2016-01-01

    Full text: The paper presents a description of the Knowledge Transfer (KT) process implemented at Cernavoda NPP, its designing and implementation. It is underlined that applying a KT approach should improve the value of existing processes of the organization through: • Identifying business, operational and safety risks due to knowledge gaps, • Transfer of knowledge from the ageing workforce to the peers and/or the organization, • Continually learning from successes and failures of individual or teams, • Convert tacit knowledge to explicit knowledge, • Improving operational and safety performance through creating both new knowledge and better access to existing knowledge. (author

  5. Can an aquatic macrophyte bioaccumulate glyphosate? A watershed scale study using a non-target hydrophyte Ludwigia peploides

    Science.gov (United States)

    Perez, Debora; Okada, Elena; Menone, Mirta; Aparicio, Virginia; Costa, Jose Luis

    2017-04-01

    The hydrophyte Ludwigia peploides is widely distributed in South America streams, and therefore, it can be used as a biomonitor for pesticides used in agricultural production. Glyphosate is one of the main pesticides used in Argentina. This has resulted in its occurrence in non-target wetland ecosystems. The objectives of this study were to: 1) establish and validate an extraction and quantification methodology for glyphosate in L.peploides plants, and 2) evaluated the role of this species as a glyphosate biomonitor in the agricultural watershed of the El Crespo stream. For the first objective, we collected plant material in the field. The leaves were dissected and oven dried at 60° C, grinded and sieved through a 0.5 mm mesh. Different solutions were tested for the extraction step. Labeled glyphosate was used as an internal standard to evaluate the recovery rate and the matrix effect of the different extraction methods. Glyphosate was derivatized with FMOC-Cl and then quantified by ultra-performance liquid chromatography (UPLC) coupled to a mass tandem spectrometer (MS/MS). The method based on an aqueous phase extraction step 0.01 mg/mL of activated carbon as a clean-up to decrease the matrix interference had a recovery of 117 ± 20% and the matrix effect was less than 20%. This method was used to analyze the glyphosate levels in L.peploides in the El Crespo stream. For the second objective, plants of L.peploides were collected on March 2016 in eight monitoring sites of the stream from the headwaters to the stream mouth. Surface water and sediments samples were collected at the same time to calculate the bioconcentration factors (BCFs) and biota-sediment bioaccumulation factors (BSAFs). The BCFs ranged between 28.57 - 280 L/Kg and the BSAFs ranged between 2.52- 30.66 at different sites. These results indicate that L.peploides can bioaccumulated glyphosate in its leaves and the major bioavailability is given mainly by the herbicide molecules present in surface

  6. Safety culture and organisational issues specific to the transitional phase from operation to decommissioning of the Ignalina Nuclear Power Plant

    International Nuclear Information System (INIS)

    Medeliene, D.

    2005-01-01

    The PHARE project Support to State Nuclear Power Safety Inspectorate for safety culture and organisational issues specific to the pre-shutdown phase of Ignalina Nuclear Power Plant was aimed at providing assistance to VATESI in their task to oversee that the Ignalina Nuclear Power Plant's management and staff are able to provide an acceptable level of reactor safety taking into account possible safety culture related problems that may occur due to the decision of an early closure of both units. Safety culture is used as a concept to characterise the attitudes, behaviour and perceptions of people that are important in ensuring the safety of nuclear power facility. Since the Chernobyl accident, the International Atomic Energy Agency (IAEA) has been active in creating guidance for ensuring that an adequate safety culture can be created and maintained. The transition from operation to decommissioning introduces uncertainty for both the organisation and individuals. This creates new challenges that need to be dealt with. Although safety culture and organisational issues have to be addressed during the entire life cycle of a nuclear power plant, owing to these special challenges, it should be especially highlighted during the transitional period from operation to decommissioning. Nuclear safety experts from Sweden, Finland, Italy, the UK and Germany, as well as Lithuanian specialists, participated in the project, and it proved to be a most effective way to share experience. The aim of this brochure is to provide information about: the importance of safety culture issues during the transitional phase from operation to decommissioning of Ignalina Nuclear Power Plant; the purpose, activities and results of this PHARE project; recommendations that are provided by western experts concerning the management of safety culture issues specific to the pre-decommissioning phase of Ignalina Nuclear Power Plant. (author)

  7. NPP Prevlaka - Preparation of construction

    International Nuclear Information System (INIS)

    Bojic, K.

    1984-01-01

    On the basis of study 'Optimal electricity generation structure till the year 2000' production of 3 x 500 MWe in nuclear power plants has been anticipated. Second Croatian-Slovenian NPP project will be based on the same principles the first one (NPP Krsko) was based on. Preconstruction investigation studies are performed at site Prevlaka on river Sava downstream of Zagreb. Licensing procedure has started with republic Urban countryside planning activities. Preconstruction activities are planned to be finished by the end of 1986. while the construction is expected to start during 1987. Parallel to investigation studies for NPP Prevlaka, evaluation of nuclear technology and reactor type is planned to be made. (author)

  8. The seismic reassessment Mochovce NPP

    International Nuclear Information System (INIS)

    Baumeister, P.

    2004-01-01

    The design of Mochovce NPP was based on the Novo-Voronez type WWER-440/213 reactor - twin units. Seismic characteristic of this region is characterized by very low activity. Mochovce NPP site is located on the rock soil with volcanic layer (andesit). Seismic reassessment of Mochovce NPP was done in two steps: deterministic approach up to commissioning confirmed value Horizontal Peak Ground Acceleration HPGA=0.1 g and activities after commissioning as a consequence of the IAEA mission indicate higher hazard values. (author)

  9. Technology for NPP decantate treatment realized at Kola NPP

    International Nuclear Information System (INIS)

    Stakhiv, Michael; Avezniyazov, Slava; Savkin, Alexander; Fedorov, Denis; Dmitriev, Sergei; Kornev, Vladimir

    2007-01-01

    At Moscow SIA 'Radon' jointly with JSC 'Alliance Gamma', the technology for NPP Decantate Treatment was developed, tested and realized at Kola NPP. This technology consists of dissolving the salt residue and subsequent treatment by ozonization, separation of the deposits formed from ozonization and selective cleaning by ferro-cyanide sorbents. The nonactive salt solution goes to an industrial waste disposal site or a repository specially developed at NPP sites for 'exempt waste' products by IAEA classification. This technology was realized at Kola NPP in December 2006 year. At this time more than 1000 m 3 of decantates log time stored are treated. It allows solving very old problem to empty decantates' tanks at NPPs in environmentally safe manner and with high volume reduction factor. (authors)

  10. NPOESS Preparatory Project (NPP) Science Overview

    Science.gov (United States)

    Butler, James J.

    2011-01-01

    NPP Instruments are: (1) well understood thanks to instrument comprehensive test, characterization and calibration programs. (2) Government team ready for October 25 launch followed by instrument activation and Intensive Calibration/Validation (ICV). NPP Data Products preliminary work includes: (1) JPSS Center for Satellite Applications and Research (STAR) team ready to support NPP ICV and operational data products. (2) NASA NPP science team ready to support NPP ICV and EOS data continuity.

  11. Workflow in Almaraz NPP

    International Nuclear Information System (INIS)

    Gonzalez Crego, E.; Martin Lopez-Suevos, C.

    2000-01-01

    Almaraz NPP decided to incorporate Workflow into its information system in response to the need to provide exhaustive follow-up and monitoring of each phase of the different procedures it manages. Oracle's Workflow was chosen for this purpose and it was integrated with previously developed applications. The objectives to be met in the incorporation of Workflow were as follows: Strict monitoring of procedures and processes. Detection of bottlenecks in the flow of information. Notification of those affected by pending tasks. Flexible allocation of tasks to user groups. Improved monitoring of management procedures. Improved communication. Similarly, special care was taken to: Integrate workflow processes with existing control panels. Synchronize workflow with installation procedures. Ensure that the system reflects use of paper forms. At present the Corrective Maintenance Request module is being operated using Workflow and the Work Orders and Notice of Order modules are about to follow suit. (Author)

  12. Dukovany NPP - Safely 16 TERA

    International Nuclear Information System (INIS)

    Vlcek, J.

    2008-01-01

    In this presentation increasing of power output of the Dukovany NPP is reviewed. To operate all Dukovany Units safely with the perspective of long-term operation (LTO) of 50 - 60 years it is proposed.

  13. Selection of NPP for Kazakhstan

    International Nuclear Information System (INIS)

    Zhotabaev, Zh.R.

    2003-01-01

    Commercial NPP for Kazakhstan should to meet to several main requirements: 1). Safety operation (accident probability not more than 10 -6 1/p. year). 2). High efficiency > 40 %. 3). Possibility of use for high-temperature chemistry and hydrogen production. 4). Possibility for manufacturing of considerable part of equipment in Kazakhstan. 5). Possibility for fuel production and reprocessing in Kazakhstan. 6). Independence from existence of large water-supply sources. Comparative analysis of several NPP with different reactors (WWR-1000, Candu, BREST, VG-400; graphite molten salt reactor) shows that NPP with the graphite molten salt reactor meets to all above requirements, but hydrogen production it is possible by more complete 4-stage technology, since coolant temperature is 800 Deg. C. The principle advantage is possibility of manufacturing of main equipment and fuel in Kazakhstan that reduce the cost of NPP construction and operation

  14. Modernization programme at Dukovany NPP

    International Nuclear Information System (INIS)

    Trnka, M.

    2000-01-01

    The main goal of each NPP is to produce electricity safely, economically and without influence to environment. For Dukovany NPP it means to upgrade all documentation and perform the Equipment Upgrading Programme. All these activities are time and money consuming and therefore the determination of priority of all items was necessary. In the presentation there are mentioned some important changes in documentation, results of PSA studies and reason for Equipment Upgrading Programme performance. It was selected the most important item from the list of Equipment Upgrading Programme the I and C upgrading. Management has decided that Dukovany NPP will become among the best NPPs with WWER type of reactor. It seems this decision is the best way how to extend lifetime of the NPP. (author)

  15. Psychology of NPP operation safety

    International Nuclear Information System (INIS)

    Tret'yakov, V.P.

    1993-01-01

    The book is devoted to psychologic investigations into different aspects of NPP operative personnel activities. The whole set of conditions on which successful and accident-free personnel operation depends, is analysed. Based on original engineering and socio-psychologic investigations complex psychologic support for NPP personnel and a system of training and upkeep of operative personnel skills are developed. The methods proposed have undergone a practical examination and proved their efficiency. 154 refs., 12 figs., 9 tabs

  16. NPP Decommissioning: the concept; state of activities

    International Nuclear Information System (INIS)

    Nemytov, S.; Zimin, V.

    2001-01-01

    The main principles of NPP decommissioning concept in Russia are given. The conditions with fulfillment of works on NPP unit pre-decommissioning and decommissioning including: development of the normative documentation, creation of special fund for financing NPP decommissioning activities, deriving the Gosatomnadzor license for decommissioning of shut down NPP units, development of the equipment and technologies for waste and spent fuel management are presented. The decommissioning cost and labour intensity of one WWER-440 unit are shown. The practical works, executed on shut down units at Beloyarsk NPP (Unit1 and 2) and Novo Voronezh NPP (Unit 1 and 2) are outlined

  17. Main features of Kola, Leningrad and Ignalina NPPs for emergency preparedness purposes

    Energy Technology Data Exchange (ETDEWEB)

    Holmstroem, H. [VTT Energy (Finland)

    2001-12-01

    Of the nuclear power plants situated in the Nordic and their neighbouring countries, the Ignalina, Lenigrad and Kola plants are considered to pose the largest risks to the public. The purpose of this report is to provide basic relevant information about these three plants for use in a case of a major nuclear accident or incident in any of them. The report could be used e.g. by authorities dealing with the resulting emergency measures to provide the public and the media with relevant information about the plant in question. The report can also be used for quick general familiarization With the plants in question. The total activity inventories for all the plants are listed at the end of the report, in Chapter 4. The release of noble gases is close to 100 % in most severe accidents, but the releases of other elements depend strongly on the plant features and the nature of the accident. This report has been compiled from several sources. The main source has been an earlier NKS-report: 'Design and Safety Features of Nuclear Reactors Neighbouring the Nordic Countries', TemaNord 1994:595, 1994. Only limited editing has been done. Sources of the figures are presented in parenthesis after the figure titles. (au)

  18. Structural integrity analysis of an Ignalina nuclear power plant building subjected to an airplane crash

    International Nuclear Information System (INIS)

    Dundulis, Gintautas; Kulak, Ronald F.; Marchertas, Algirdas; Uspuras, Eugenijus

    2007-01-01

    Recent terrorist attacks using commandeered commercial airliners on civil structures have raised the issue of the ability of nuclear power plants to survive the consequences of an airliner crash. The structural integrity analysis due to the effects of an aircraft crash on an Ignalina nuclear power plant (INPP) accident localization system (ALS) building is the subject of this paper. A combination of the finite element method and empirical relationships were used for the analysis. A global structural integrity analysis was performed for a portion of the ALS building using the dynamic loading from an aircraft crash impact model. The local effects caused by impact of the aircraft's engine on the building wall were evaluated independently by using an empirical formula. The results from the crash analysis of a twin engine commercial aircraft show that the impacted reinforced concrete wall of the ALS building will not have through-the-wall concrete failure, and the reinforcement will not fail. Strain-rate effects were found to delay the onset of cracking. Therefore, the structural integrity of the impacted wall of the INPP ALS building will be maintained during the crash event studied

  19. Structural integrity analysis of an Ignalina nuclear power plant building subjected to an airplane crash

    Energy Technology Data Exchange (ETDEWEB)

    Dundulis, Gintautas [Laboratory of Nuclear Installation Safety, Lithuanian Energy Institute, 3 Breslaujos, 44403 Kaunas-35 (Lithuania)]. E-mail: gintas@isag.lei.lt; Kulak, Ronald F. [RFK Engineering Mechanics Consultants (United States); Marchertas, Algirdas [Northern Illinois University (United States); Uspuras, Eugenijus [Laboratory of Nuclear Installation Safety, Lithuanian Energy Institute, 3 Breslaujos, 44403 Kaunas-35 (Lithuania)

    2007-08-15

    Recent terrorist attacks using commandeered commercial airliners on civil structures have raised the issue of the ability of nuclear power plants to survive the consequences of an airliner crash. The structural integrity analysis due to the effects of an aircraft crash on an Ignalina nuclear power plant (INPP) accident localization system (ALS) building is the subject of this paper. A combination of the finite element method and empirical relationships were used for the analysis. A global structural integrity analysis was performed for a portion of the ALS building using the dynamic loading from an aircraft crash impact model. The local effects caused by impact of the aircraft's engine on the building wall were evaluated independently by using an empirical formula. The results from the crash analysis of a twin engine commercial aircraft show that the impacted reinforced concrete wall of the ALS building will not have through-the-wall concrete failure, and the reinforcement will not fail. Strain-rate effects were found to delay the onset of cracking. Therefore, the structural integrity of the impacted wall of the INPP ALS building will be maintained during the crash event studied.

  20. Spain in South Ukraine NPP

    International Nuclear Information System (INIS)

    Ibanez, M.

    1994-01-01

    A Technical Assistance Protocol was signed between the Governments of the GIS and the Commission of the European Union (CEU) on August 2, 1991 and this was the starting point of the TACIS program. In this article, the activities described are those related to the TACIS-92/93/94 on site technical assistance to South Ukraine NPP (SUK NPP). Within the scope of the TACIS 92 Program the CEU and the Ukrainian Authorities agreed a list of projects to be implemented at South Ukraine NPP with the aim to improve the operational safety of the plant. This part of the program is called TACIS 92 on-site activities. The total budget allocated to these projects is a MECU. The European Union ''utility'' selected to lead this program at South Ukraine NPP was UNESA and the first contract to cover our activities was signed in July 1993 between the CEU (Mr. Pablo Benavides) and UNESA (Mr. Pedro Rivero). The projects will be implemented at SUK NPP but according to the contract UNESA is ''The Consultant'' and GOSKOMATON (The Ukrainian Sate Committee on Nuclear Power Utilization) is the ''Recipient Institution''. (Author)

  1. Regulatory approach to NPP ageing in Bulgaria

    International Nuclear Information System (INIS)

    Vassilev, D.

    2000-01-01

    In this contribution summary information of Kozloduy NPP units is presented. The nuclear legislation, regulatory approach for managing safety aspects on NPP ageing, short term programme, complex programme PRG'97 ant other aspects of ageing management are discussed

  2. Some problems of NPP personnel training

    International Nuclear Information System (INIS)

    Vajshnis, P.P.; Kumkov, L.P.; Omel'chuk, V.V.

    1984-01-01

    Shortcomings of NPP personnel training are discussed. Development of full-scale training systems is necessary for qualitative training operative personnel. Primary problems that should be necessarily solved for ensuring effective training NPP personnel are considered

  3. Ignalina Nuclear Power Plant - the management of a major backfitting exercise

    International Nuclear Information System (INIS)

    Bissell, J.

    1995-01-01

    This paper describes the work being undertaken at Ignalia NPP on the Nuclear Safety Project using funds managed by the Nuclear Safety Account of the European Bank for Reconstruction and Development (EBRD). The background of the Nuclear Safety Account and the Grants made from it are summarised. Finally the work of the Project Management Unit (PMU) is described and lessons learned are outlined. (author)

  4. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Kastchiev, G.

    1999-01-01

    Extensive review of the NPP Safety is presented including tasks of Ministry of Health, Ministry of Internal Affairs, Ministry of Environment and Waters, Ministry of Defense in the field of national system for monitoring the nuclear power. In the frame of national nuclear safety legislation Bulgaria is in the process of approximation of the national legislation to that of EC. Detailed analysis of the status of regulatory body, its functions, organisation structure, responsibilities and future tasks is included. Basis for establishing the system of regulatory inspections and safety enforcement as well as intensification of inspections is described. Assessment of safety modifications is concerned with complex program for reconstruction of Units 1-4 of Kozloduy NPP, as well as for modernisation of Units 5 and 6. Qualification and licensing of the NPP personnel, Year 2000 problem, priorities and the need of international assistance are mentioned

  5. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  6. Safety culture at Mochovce NPP

    International Nuclear Information System (INIS)

    Markus, Jozef; Feik, Karol

    2002-01-01

    This article presents the approach of Mochovce NPP to the Safety culture. It presents activities, which have been taken by Mochovce NPP up to date in the area of Safety culture enhancement with the aim of getting the term into the subconscious of each employee, and thus minimising the human factor impact on occurrence of operational events in all safety areas. The article furthermore presents the most essential information on how the elements characterising a continuous progress in reaching the planned Safety culture goals of the company management have been implemented at Mochovce NPP, as well as the management's efforts to get among the best nuclear power plant operators in this area and to be an example for the others. (author)

  7. A special information campaign on decommissioning of unit 1 at the Ignalina Nuclear Power Plant started in Lithuania

    International Nuclear Information System (INIS)

    Vitkiene, E.

    2000-01-01

    A lack of understanding is felt in Lithuania of the importance of informing the public about nuclear energy, its safety and decisions related with nuclear energy in general. our swedish colleagues have noticed this flaw in our work and a joined decision has been taken to start a series of publicity projects. It was decided to work along three lines: a series of programmes on the national TV, support to the media of the town of Visaginas and creating an Internet page on the Ignalina Nuclear Power Plant decommissioning

  8. Radioactive wastes management of NPP

    International Nuclear Information System (INIS)

    Klyuchnikov, A.A.; Pazukhin, Eh.M.; Shigera, Yu. M.; Shigera, V.Yu.

    2005-01-01

    Modern knowledge in the field of radiation waste management on example of the most serious man-made accident at Chernobyl NPP are illuminated. This nuclear power plant that after accident in 1986 became in definite aspect an experimental scientific ground, includes all variety of problems which have to be solved by NPP personnel and specialists from scientific organizations. This book is aimed for large sphere of readers. It will be useful for students, engineers, specialists and those working in the field of nuclear power, ionizing source and radiation technology use for acquiring modern experience in nuclear material management

  9. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  10. NPP Krsko secondary side analysis

    International Nuclear Information System (INIS)

    Fabijan, Lj.

    1987-01-01

    The purpose of this work is to analyze secondary side thermohydraulics response on steam generator tube plugging in order to ensure nominal NPP power. We had established that the additional opening of the governing valve No. 3 and 4 can compensate pressure drop caused by steam generator tube plugging. Two main steam flows with four governing valves were simulated. Steam expansion in turbine and feed water system was modeled separately. All important process point and steam moisture changes impact on nominal NPP power were analysed. (author)

  11. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  12. Safety aspects of NPP ageing

    International Nuclear Information System (INIS)

    1995-01-01

    Preparation of safety practices on assessment and management of aging of major NPP components important to safety, CRP on management of aging of concrete containment buildings, CRP on management of aging of in-containment instrumentation and control cables are outlined

  13. Qualification of NPP operations personnel

    International Nuclear Information System (INIS)

    Wang Jiao.

    1987-01-01

    Competence of personnel is one of the important problems for safety operation of nuclear power plant. This paper gives a description of some aspects, such as the administration of NPP, posts, competence of personnel, training, assessing the competence and personnel management

  14. Peer review of the Barselina Level 1 probabilistic safety assessment of the Ignalina Nuclear Power Plant, Unit 2

    International Nuclear Information System (INIS)

    McKay, S.L.; Coles, G.A.

    1995-01-01

    The Barselina Project is a Swedish-funded, cooperative effort among Lithuania, Russia and Sweden to transfer Western probabilistic safety assessment (PSA) methodology to the designers/operators of Ignalina Nuclear Power Plant (INPP). The overall goal is to use the PSA as a tool for assessing plant operational safety. The INPP is a two-unit, Former Soviet Union-designed nuclear facility located in Lithuania. The results of this PSA will ultimately be used to identify plant-specific improvements in system design and the conduct of facility operations, allowing improved operational safety. Pacific Northwest Laboratory (PNL) was asked to perform an independent expert peer review of the Barselina PSA. This report documents the findings of this review. This review, financed with nuclear safety assistance funds through the US Agency for International Development (USAID) and the US Department of Energy (DOE), satisfies Task II of the PNL peer review of the Barselina project. The objective is to provide an independent, in-proce ss examination of the Barselina Level 1 PSA of Ignalina Nuclear Power Plant, Unit 2. The review consisted of an investigation of the project documentation, interviews, and extensive discussions with the PSA staff during critical stages of the project. PNL assessed the readability, completeness, consistency, validity, and applicability of the PSA. The major aspects explored were its purpose, major assumptions, analysis/modeling, results, and interpretation. It was not within the scope of this review to perform plant walkdowns or to review material other than the PSA documentation

  15. Migration of 90Sr in the cooling basin of the Ignalina atomic power plant and the Baltic sea ecosystems

    International Nuclear Information System (INIS)

    Dushauskiene-Duzh, R.

    1992-01-01

    On the basis of a long-time radiation monitoring of the Ignalina APP and the Baltic sea ecosystems determined regularities of the 90 Sr distribution in the main components of the ecosystems (water, bottom sediments, biota). It was established that 90 Sr accumulation coefficient in the aquatic plants of the warmed up water zone of the Ignalina APP is 2.6 lower than that of the stable water suction zone. The accumulation of 90 Sr in molluscs is higher in the warmed up water zone than in the stable water zone. It was determined that the mean concentration of 90 Sr in surface water of near-shore areas of the Baltic sea are higher than that in the open Baltic. Concentration of the 90 Sr in the biota in the Baltic sea is about 300-500 times higher than in the water. The accumulation level of 90 Sr in zoobenthos varies in different species being in organs and tissues of fishes consuming actively calcium for building up their skeletons. 90 Sr levels in bottom sediments of bays are higher than those in sediments of the open sea. Accumulation of 90 Sr in muds is about 11 times higher than in sands. (author). 5 figs., 3 refs

  16. The European Bank for Reconstruction and Development and Lithuania in Partnership are Targeting Ignalina NPP Decommissioning Support and Energy Sector Development

    International Nuclear Information System (INIS)

    Novak, V.; Grabia, G.

    2003-01-01

    The Republic of Lithuania and the EBRD have developed very effective working relations since the establishment of the Bank in 1991. The Bank is a major investor in Lithuania and has committed 400.4 million Euro in loans and equity investments for a large number of private and public sector projects. In addition, the EBRD supports Lithuania as manager of special international grant funds

  17. ASSET experience at Paks NPP

    International Nuclear Information System (INIS)

    Szabo, I.

    1997-01-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones

  18. Retrofitting of NPP Computer systems

    International Nuclear Information System (INIS)

    Pettersen, G.

    1994-01-01

    Retrofitting of nuclear power plant control rooms is a continuing process for most utilities. This involves introducing and/or extending computer-based solutions for surveillance and control as well as improving the human-computer interface. The paper describes typical requirements when retrofitting NPP process computer systems, and focuses on the activities of Institute for energieteknikk, OECD Halden Reactor project with respect to such retrofitting, using examples from actual delivery projects. In particular, a project carried out for Forsmarksverket in Sweden comprising upgrade of the operator system in the control rooms of units 1 and 2 is described. As many of the problems of retrofitting NPP process computer systems are similar to such work in other kinds of process industries, an example from a non-nuclear application area is also given

  19. ASSET experience at Paks NPP

    Energy Technology Data Exchange (ETDEWEB)

    Szabo, I [Operational Safety Dept., Paks NPP, Paks (Hungary)

    1997-10-01

    At Paks NPP special attention has been paid to international reviews since the very beginning of operation. Several international teams visited Paks in order to provide independent assessment of plant performance, conditions and safety. Paks NPP Management has the further intention to invite international reviews regularly (yearly) in the future as well. The experience gained during these reviews helped to establish a unified process of preparation for the reviews, performing them and handling the results. The Safety Department is in charge of organization of the whole process. All these reviews have their specific features and they are focused on different areas. The ASSET reviews provides the assessment of plant performance and safety through the analysis of safety significant events, which have occurred at the nuclear power plant. This approach makes this review specific and different from the other ones.

  20. Nuclear Fuel in Cofrentes NPP

    International Nuclear Information System (INIS)

    2002-01-01

    Fuel is an essential in the nuclear power generating business because of its direct implications on safety, generating costs and the operating conditions and limitations of the facility. Fuel management in Cofrentes NPP has been targeted at optimized operation, enhanced reliability and the search for an in-depth knowledge of the design and licensing processes that will provide Iberdrola,as the responsible operator, with access to independent control of safety aspects related to fuel and free access to manufacturing markets. (Author)

  1. NPP Krsko Living PSA Concept

    International Nuclear Information System (INIS)

    Vrbanic, I.; Spiler, J.

    2000-01-01

    NPP Krsko developed PSA model of internal and external initiators within the frame of the Individual Plant Examination (IPE) project. Within this project PSA model was used to examine the existing plant design features. In order to continue with use of this PSA model upon the completion of IPE in various risk-informed applications in support of plant operation and evaluations of design changes, an appropriate living PSA concept needed to be defined. The Living PSA concept is in NPP Krsko considered as being a set of activities pursued in order to update existing PSA model in a manner that it appropriately represents the plant design, operation practice and history. Only a PSA model which is being updated in this manner can serve as a platform for plant-specific risk informed applications. The NPP Krsko living PSA concept is based on the following major ponts. First, the baseline PSA model is defined, which is to be maintained and updated and which is to be reference point for any risk-informed application. Second, issues having a potential for impact on baseline PSA model are identified and procedure and responsibilities for their permanent monitoring and evaluation are established. Third, manner is defined in which consequential changes to baseline PSA model are implemented and controlled, together with associated responsibilities. Finally, the process is defined by which the existing version of baseline PSA model is superseded by a new one. Each time a new version of baseline PSA model is released, it would be re-quantified and the results evaluated and interpreted. By documenting these re-quantifications and evaluations of results in a sequence, the track is being kept of changes in long-term averaged risk perspective, represented by long-term averaged frequencies of core damage and pre-defined release categories. These major topics of NPP Krsko living PSA concept are presented and discussed in the paper. (author)

  2. Welding facilities for NPP assembling

    International Nuclear Information System (INIS)

    Rojtenberg, S.S.

    1987-01-01

    Recommendations concerning the choice of equipment for welding in pre-assembling work shops, in the enlarging assembling shops and at the assembling site, are given. Advanced production automatic welders and semiautomatic machines, applied during the NPP equipment assembling as well as automatic machines specially produced for welding the main reactor components and pipelines are described. Automatic and semiautomatic machine and manual welding post supply sources are considered

  3. New approach of second Romanian NPP siting

    International Nuclear Information System (INIS)

    Mauna, Traian

    2010-01-01

    The NPP sitting studies in Romania began before 1975. The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units. Gained the experience from Cernavoda NPP sitting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the NPP Cernavoda project to the new parameters of close water cooling circuit and hard less and no rock foundation strata. The studies were carrying out in different stages on the inner rivers Olt, Mures, Somes in Transylvania historical region. This paper tries to reconsider shortly the old analysis according to the last IAEA Safety Standards, taking into account the new NPP generation requirement. Paper is focused on geological aspects and other local sites characteristics. (authors)

  4. On the NPP structural reliability

    International Nuclear Information System (INIS)

    Klemin, A.I.; Polyakov, E.F.

    1980-01-01

    Reviewed are the main statements peculiarities and possibilities of the first branch guiding technical material (GTM) ''The methods of calculation of structural reliability of NPP and its systems at the stage of projecting''. It is stated, that in GTM presented are recomendations on the calculation of reliability of such specific systems, as the system of the reactor control and protection the system of measuring instruments and automatics and safe systems. GTM are based on analytical methods of modern theory of realibility with the Use of metodology of minimal cross sections of complex systems. It is stressed, that the calculations on the proposed methods permit to calculate a wide complex of reliability parameters, reflecting separately or together prorerties of NPP dependability and maintainability. For NPP, operating by a variable schedule of leading, aditionally considered are parameters, characterizing reliability with account of the proposed regime of power change, i.e. taking into account failures, caused by decrease of the obtained power lower, than the reguired or increase of the required power higher, than the obtained

  5. Metamorphosis of NPP A1, V1, V2

    International Nuclear Information System (INIS)

    Dobak, D.; Moncekova, M.

    2005-01-01

    In this book the history of construction, commissioning and exploitation of NPP A1, NPP V1 and NPP V2 in Jaslovske Bohunice is presented on documentary photos. Vicinity around of these NPPs is presented, too

  6. Environmental safety aspects of the new solid radioactive waste management and storage facility at the Ignalina Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Ragaisis, Valdas; Poskas, Povilas; Simonis, Vytautas; Adomaitis, Jonas Erdvilas [Lithuanian Energy Institute, Kaunas (Lithuania). Nuclear Engineering Lab.

    2011-11-15

    New solid radioactive waste management and interim storage facilities will be constructed for the Ignalina Nuclear Power Plant to support ongoing decommissioning activities, including removal and treatment of operational waste from the existing storage buildings. The paper presents approach and methods that have been used to assess radiological impacts to the general public potentially arising under normal operation and accident conditions and to demonstrate compliance with regulations in force. The assessment of impacts from normal operation includes evaluation of exposure arising from release of airborne radioactive material and from facilities and packages containing radioactive material. In addition, radiological impacts from other nearby operating and planned nuclear facilities are taken into consideration. The assessment of impacts under accident conditions includes evaluation of exposure arising from the selected design and beyond design basis accidents. (orig.)

  7. Phonic and induced level of mutations and mutagenicity in bioorganisms habitating in the environs of Ignalina APP

    International Nuclear Information System (INIS)

    Lekevichius, R.; Morkunas, V.; Knabikas, A.

    1992-01-01

    The investigation of the extracts from the water, mud and hydrobionts of the lake Drukshiai before the construction of the Ignalina atomic power plant (1982-1984) and after its construction enabled to detect the moment of the build-up of mutagens in the hydrobionts (in 1986), when the extracts began to induce spot mutations in Salmonella typhimurium and exchanges of sister chromatids in human leukocytes in vitro. The mutagenicity of rain water, sewerage water and water from the cooler of the atomic power plant to drosophila and Salmonella typhimurium has been detected. The increments of mutations in the populations of Larus ridibundus and Microtus arvalis inhabiting the surroundings of the atomic power plant has not been noticed. (author). 4 figs., 4 refs

  8. Ecotoxicological effects evoked in hydrophytes by leachates of invasive Acer negundo and autochthonous Alnus glutinosa fallen off leaves during their microbial decomposition

    International Nuclear Information System (INIS)

    Krevš, Alina; Darginavičienė, Jūratė; Gylytė, Brigita; Grigutytė, Reda; Jurkonienė, Sigita; Karitonas, Rolandas; Kučinskienė, Alė; Pakalnis, Romas; Sadauskas, Kazys; Vitkus, Rimantas

    2013-01-01

    Throughout 90-day biodegradation under microaerobic conditions, invasive to Lithuania species boxelder maple (Acer negundo) leaves lost 1.5-fold more biomass than that of autochthonous black alder (Alnus glutinosa), releasing higher contents of N tot , ammonium and generating higher BOD 7 . Boxelder maple leaf leachates were characterized by higher total bacterial numbers and colony numbers of heterotrophic and cellulose-decomposing bacteria than those of black alder. The higher toxicity of A. negundo aqueous extracts and leachates to charophyte cell (Nitellopsis obtusa), the inhabitant of clean lakes, were manifested at mortality and membrane depolarization levels, while the effect on H + -ATPase activity in membrane preparations from the same algae was stronger in case of A. glutinosa. Duckweed (Lemna minor), a bioindicator of eutrophic waters, was more sensitive to leaf leachates of A. glutinosa. Fallen leaves and leaf litter leachates from invasive and native species of trees, which enter water body, affect differently microbial biodestruction and aquatic vegetation in freshwater systems. - Highlights: ► We examined Acer negundo and Alnus glutinosa leaf extract effects on hydrophytes. ► Nitellopsis obtusa and Lemna minor responded differently to leaf litter leachates. ► 90-day biodegraded A. negundo leaves lost twofold more biomass than that of A. glutinosa. ► A. negundo leachates evoked higher mortality and cell depolarization of N. obtusa. ► Leachates affected H + -ATPase activity in algae membrane preparations. - Fallen leaves and leaf litter leachates from invasive and native species of trees, which enter waterbody can be environmental factor affecting differently microbial biodestruction and aquatic vegetation in freshwater systems, thus influencing ecological scenarios.

  9. Past, present and future of safeguards implementation for the on-load RMBK-1500 reactors in Ignalina

    International Nuclear Information System (INIS)

    Zendel, M.; Yim, S.; Monticone, C.; Kurselis, S.

    1999-01-01

    The on-load refueled RBMKs ('Reactor Bolshoy Moschnosti Kanalniy - Large Power Channel Type Reactor') are very different from all other power reactors which the Agency has been safeguarding over the past decades. Distinct differences in fuel properties and handling necessitated the formulation of separate, facility specific approaches. The spent fuel management at the RBMKs in Ignalina uses hot cells to cut each spent fuel assembly into two subassemblies. A large number of subassemblies are subsequently stored in large capacity, compact storage baskets at the spent fuel storage ponds adjacent to the reactor hall. The development of the safeguards approach is presented considering limitation in core access, technological feasibility, operation mode and financial as well as human resources of the Agency. The safeguards approach is based on a quarterly inspection scheme using Containment and Surveillance (C/S) measures, verification of fresh and spent fuel by Non Destructive Assay (NDA), establishing of flow balances to complement the material accountancy and the application of neutron/gamma monitors in a continuous, unattended mode. The implementation of these safeguards measures is discussed and actual inspection experience with an emphasis on the application of the neutron/gamma monitors is given. The neutron/gamma monitors serve multiple safeguards functions, such as monitoring shipments of waste from cutting operations for irradiated fuel in the hot cells, confirming the unloading history for the on-load reactors, complementing C/S by detecting movements of irradiated fuel materials in the reactor halls and verifying the operational status and the power output of the reactors. Actual measurement results are presented to demonstrate their effectiveness. Power Considerations are given for future safeguards implementation matters at Ignalina Nuclear plant (INPP) including measures for the Strengthened Safeguards System (SSS). (author)

  10. Radiation monitoring in the NPP environment, control of radioactivity in NPP-environment system

    International Nuclear Information System (INIS)

    Egorov, Yu.A.

    1987-01-01

    Problems of radiation monitoring and control of the NPP-environment system (NPPES) are considered. Radiation control system at the NPP and in the environment provides for the control of the NPP, considered as the source of radioactive releases in the environment and for the environmental radiation climate control. It is shown, that the radiation control of the NPP-environment system must be based on the ecological normalization principles of the NPP environmental impacts. Ecological normalization should be individual for the NPP region of each ecosystem. The necessity to organize and conduct radiation ecological monitoring in the NPP regions is pointed out. Radiation ecological monitoring will provide for both environmental current radiation control and information for mathematical models, used in the NPPES radiation control

  11. The analysis of cracks in high-pressure piping and their effects on strength and lifetime of construction components at the Ignalina nuclear plant

    Energy Technology Data Exchange (ETDEWEB)

    Aleev, A.; Petkevicius, K.; Senkus, V. [and others

    1997-04-01

    A number of cracks and damages of other sorts have been identified in the high-pressure parts at the Ignalina Nuclear Plant. They are caused by inadequate production- and repair technologies, as well as by thermal, chemical and mechanical processes of their performance. Several techniques are available as predictions of cracks and other defects of pressurized vessels. The choice of an experimental technique should be based on the level of its agreement with the actual processes.

  12. Display systems for NPP control

    International Nuclear Information System (INIS)

    Rozov, S.S.

    1988-01-01

    Main trends in development of display systems used as the means for image displaying in NPP control systems are considered. It is shown that colour display devices appear to be the most universal means for concentrated data presentation. Along with digital means the display systems provide for high-speed response, sufficient for operative control of executive mechanisms. A conclusion is drawn that further development of display systems will move towards creation of large colour fields (on reflection base or with multicolour gas-discharge elements)

  13. Emergency preparedness at Barsebaeck NPP in Sweden

    International Nuclear Information System (INIS)

    Olsson, R.; Lindvall, C.

    1998-01-01

    On-site emergency preparedness plan at Barsebaeck NPP is presented. In an emergency the responsibility of the NPP is to alarm the emergency organizations, spend all efforts to restore safe operation, assess the potential source term as to size and time, protect their own personnel, inform personnel and public. Detailed emergency procedures overview is provided

  14. Constructive approaches to the space NPP designing

    International Nuclear Information System (INIS)

    Eremin, A.G.; Korobkov, L.S.; Matveev, A.V.; Trukhanov, Yu.L.; Pyshko, A.P.

    2000-01-01

    An example of designing a space NPP intended for power supply of telecommunication satellite is considered. It is shown that the designing approach based on the introduction of a leading criterion and dividing the design problems in two independent groups (reactor with radiation shield and equipment module) permits to develop the optimal design of a space NPP [ru

  15. NPP Bohunice experience with ASSET services

    International Nuclear Information System (INIS)

    Klimo, J.

    1996-01-01

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author)

  16. NPP Bohunice experience with ASSET services

    Energy Technology Data Exchange (ETDEWEB)

    Klimo, J [Bohunice NPP (Slovakia)

    1997-12-31

    The general description of Bohunice NPP ASSET experience history was given at the last annual workshop in 1995. In my short presentation I would like to pay attention to the progress in this area which was achieved at our NPP during the last year. (author).

  17. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  18. Chernobyl NPP accident. Overcoming experience. Acquired lessons

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Vasil'chenko, V.N.; Klyuchnikov, A.A.; Prister, B.S.

    2006-01-01

    This book is devoted to the 20 anniversary of accident on the Chernobyl NPP unit 4. History of construction, causes of the accident and its consequences, actions for its mitigation are described. Modern situation with Chernobyl NPP decommissioning and transferring of 'Ukryttya' shelter into ecologically safe system are mentioned. The future of Chernobyl site and exclusion zone was discussed

  19. Seismic characterization of the NPP Krsko site

    International Nuclear Information System (INIS)

    Obreza, J.

    2000-01-01

    The goal of NPP Krsko PSA Project Update was the inclusion of plant changes (i.e. configuration/operational related) through the period January 1, 1993 till the OUTAGE99 (April 1999) into the integrated Internal/External Level 1/Level 2 NPP Krsko PSA RISK SPECTRUM model. NPP Krsko is located on seismotectonic plate. Highest earthquake was recorded in 1917 with magnitude 5.8 at a distance of 7-9 km. Site (founded) on Pliocene sediments which are as deep as several hundred meters. No surface faulting at the Krsko site has been observed and thus it is not to be expected. NPP Krsko is equipped with seismic instrumentation, which allows it to complete OBE (SSE). The seismic PSA successfully showed high seismic margin at Krsko plant. NPP Krsko seismic design is based on US regulations and standards

  20. Operating Experience at NPP Krsko

    International Nuclear Information System (INIS)

    Kavsek, D.; Bach, B.

    1998-01-01

    Systematic analysis of operational experience by assessment of internal and industry events and the feedback of lessons learned is one of the essential activities in the improvement of the operational safety and reliability of the nuclear power plant. At NPP Krsko we have developed a document called ''Operating Experience Assessment Program''. Its purpose is to establish administrative guidance for the processing of operating events including on-site and industry events. Assessment of internal events is based on the following methods: Event and Causal Factor Charting, Change Analysis, Barrier Analysis, MORT (Management Oversight and Risk Tree Analysis) and Human Performance Evaluation. The operating experience group has developed a sophisticated program entitled ''Operating experience tracking system'' (OETS) in response to the need for a more efficient way of processing internal and industry operating experience information. The Operating Experience Tracking System is used to initiate and track operational events including recommended actions follow up. Six screens of the system contain diverse essential information which allows tracking of operational events and enables different kinds of browsing. OETS is a part of the NPP Krsko nuclear network system and can be easily accessed by all plant personnel. (author)

  1. Regulatory aspects of NPP safety in Lithuania

    International Nuclear Information System (INIS)

    Kutas, S.

    1999-01-01

    The functions of safety and control of nuclear facilities as well as supervision of accounting nuclear materials shall be performed by the State Nuclear Power safety Inspectorate of the Republic of Lithuania (VATESI). The supervision and control of nuclear facilities shall also be carries out within the framework of their respective competence, by other state institutions as well as by local authorities in the territories of their jurisdiction. Licenses for the activities referred to design, construction and reconstruction of nuclear facilities shall be issued by VATESI with the approval of the Ministry of Health, Ministry of Environment a local authority whose territory is within the sanitary protection zone of nuclear facility. An urgent need is recognised for support on integrated international assistance program for improvement of Ignalina safety program. A detailed list of nuclear regulation acts is included in the presentation

  2. Does climate directly influence NPP globally?

    Science.gov (United States)

    Chu, Chengjin; Bartlett, Megan; Wang, Youshi; He, Fangliang; Weiner, Jacob; Chave, Jérôme; Sack, Lawren

    2016-01-01

    The need for rigorous analyses of climate impacts has never been more crucial. Current textbooks state that climate directly influences ecosystem annual net primary productivity (NPP), emphasizing the urgent need to monitor the impacts of climate change. A recent paper challenged this consensus, arguing, based on an analysis of NPP for 1247 woody plant communities across global climate gradients, that temperature and precipitation have negligible direct effects on NPP and only perhaps have indirect effects by constraining total stand biomass (Mtot ) and stand age (a). The authors of that study concluded that the length of the growing season (lgs ) might have a minor influence on NPP, an effect they considered not to be directly related to climate. In this article, we describe flaws that affected that study's conclusions and present novel analyses to disentangle the effects of stand variables and climate in determining NPP. We re-analyzed the same database to partition the direct and indirect effects of climate on NPP, using three approaches: maximum-likelihood model selection, independent-effects analysis, and structural equation modeling. These new analyses showed that about half of the global variation in NPP could be explained by Mtot combined with climate variables and supported strong and direct influences of climate independently of Mtot , both for NPP and for net biomass change averaged across the known lifetime of the stands (ABC = average biomass change). We show that lgs is an important climate variable, intrinsically correlated with, and contributing to mean annual temperature and precipitation (Tann and Pann ), all important climatic drivers of NPP. Our analyses provide guidance for statistical and mechanistic analyses of climate drivers of ecosystem processes for predictive modeling and provide novel evidence supporting the strong, direct role of climate in determining vegetation productivity at the global scale. © 2015 John Wiley & Sons Ltd.

  3. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2009-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  4. ESTE EMO and ESTE EBO - emergency response system for NPP Mochovce and NPP Bohunice V-2

    International Nuclear Information System (INIS)

    Caeny, P.; Chyly, M.; Suchon, D.; Smejkalova, E.; Fabova, V.; Mancikova, M.; Muller, P.

    2008-01-01

    Programs ESTE EMO and ESTE EBO are emergency response systems that help the crisis staff of the NPP in assessing the source term (predicted possible release of radionuclides to the atmosphere ), in assessing the urgent protective measures and sectors under threat, in assessing real release (symptoms of release really detected and observed), in calculating radiological impacts of real release, averted or avertable doses, potential doses and doses during transport or evacuation on specified routes. Both systems serve as instruments in case of severe accident (DBA or BDBA) at NPP Mochovce or NPP Bohunice, accidents with threat of release of radioactivity to the atmosphere. Systems are implemented at emergency centre of Mochovce NPP and Bohunice NPP and connected online to the sources of technological and radiological data from the reactor, primary circuit, confinement, secondary circuit, ventilation stack, from the area of NPP (TDS 1) and from the emergency planning zone (TDS 11). Systems are connected online to the sources of meteorological data, too. (authors)

  5. Study on human factor at NPP

    International Nuclear Information System (INIS)

    Nopp, I.

    1984-01-01

    Factors affecting the reliabilty of the reactor control by an NPP operator are considered on the base of the Czechoslovakia NPP operating experience. The reliability level of NPP operators depends on objective factors (conditions and regime of labour) determining the labour productivity and on subjective ones (psychological morale, physical and mental abilities and occupational level of personnel). Problems of the effect of physical and mental abilities and professional level on the reliability of personnel are considered to be the most important ones. The effect of individual abilities and specific features of the human body on changes in his occupational abilities can be estimated only to a certain degree

  6. Inspection Qualification Centre in NPP 'Kozloduy'

    International Nuclear Information System (INIS)

    Mikhovski, M.

    2000-01-01

    In May 1999 according to the working plan of the IAEA project RER 4/020 and the decision of the NPP the Inspection Qualification Centre (IQC) has been established in order to provide examination services in the NPP. During year 1999 IVC (AEA Technology) in the framework of the DTI project provides consulting and technical assistance to the NPP, IQC, Bulgarian Academy of Sciences and Regulatory Authorities in setting up the IQC infrastructure. Now IQC work as an independent inspection body B type. The IQC activities for the period 1999-2000 are presented and further tasks are outlined

  7. Krsko NPP radioactive waste characteristics

    International Nuclear Information System (INIS)

    Skanata, D.; Kroselj, V.; Jankovic, M.

    2007-01-01

    In May 2005 Krsko NPP initiated the Radioactive Waste Characterization Project and commissioned its realization to the consulting company Enconet International, Zagreb. The Agency for Radwaste Management was invited to participate on the Project. The Project was successfully closed out in August 2006. The main Project goal consisted of systematization the existing and gathering the missing radiological, chemical, physical, mechanical, thermal and biological information and data on radioactive waste. In a general perspective, the Project may also be considered as a part of broader scope of activities to support state efforts to find a disposal solution for radioactive waste in Slovenia. The operational low and intermediate level radioactive waste has been structured into 6 waste streams that contain evaporator concentrates and tank sludges, spent ion resins, spent filters, compressible and non-compressible waste as well as specific waste. For each of mentioned waste streams, process schemes have been developed including raw waste, treatment and conditioning technologies, waste forms, containers and waste packages. In the paper the main results of the Characterization Project will be briefly described. The results will indicate that there are 17 different types of raw waste that have been processed by applying 9 treatment/conditioning technologies. By this way 18 different waste forms have been produced and stored into 3 types of containers. Within each type of container several combinations should be distinguished. Considering all of this, there are 34 different types of waste packages altogether that are currently stored in the Solid Radwaste Storage Facility at the Krsko NPP site. Because of these findings a new identification system has been recommended and consequently the improvement of the existing database on radioactive waste has been proposed. The potential areas of further in depth characterization are indicated. In the paper a brief description on the

  8. Treatment of NPP wastes using vitrification

    International Nuclear Information System (INIS)

    Sobolev, I.A.; Lifanov, F.A.; Stefanovsky, S.V.; Kobelev, A.P.; Savkin, A.E.; Kornev, V.I.

    1998-01-01

    Glass-based materials to immobilize various liquid and solid radioactive wastes generated at nuclear power plants (NPP) were designed. Glassy waste forms can be produced using electric melting including a cold crucible melting. Leach rate of cesium was found to be 10 -5 -10 -6 g/(cm 2 day) (IAEA technique). Volume reduction factor after vitrification reached 4-5. Various technologies for NPP waste vitrification were developed. Direct vitrification means feeding of source waste into the melter with formation of glassy waste form to be disposed. Joule heated ceramic melter, and cold crucible were tested. Process variables at treatment of Kursk, Chernobyl (RBMK), Kalinin, Novovoronezh (VVER) NPP wastes were determined. The most promising melter was found to be the cold crucible. Pilot plant based on the cold crucibles has been designed and constructed. Solid burnable NPP wastes are incinerated and slags are incorporated in glass. (author)

  9. Environmental impact assessment of NPP decommissioning

    International Nuclear Information System (INIS)

    Hinca, R.

    2009-01-01

    In this presentation the following potential impacts of decommissioning of NPP are discussed: - Impacts on population; Impacts on natural environment; Land impacts; Impacts on urban complex and land utilisation; Possible impacts on area as a result of failure.

  10. Radiation ecological monitoring in NPP region

    International Nuclear Information System (INIS)

    Egorov, Yu.A.; Kazakov, S.V.

    1985-01-01

    The known principle of sanitary-hygienic regulation of NPP radiation effect on man and environment is analyzed. An ecological approach is required to optimize NPP relations with the environment and to regulate radioactivity of the NPP - environment system. The ecological approach envisages the development of standards of permissible concentrations of radioactive and chemical substances (as well as heat) in natural environment, taking into account their synergism, corresponding to ecologically permissible response reactions of biota to their effect. The ecological approach also comprises the sanitary-hygienic principle of radiation protection of man. Attention is paid to ecological monitoring in NPP region, comprising consideration of factors, affecting the environment, evaluation of the actual state of the environment, prediction of the environmental state, evaluation of the expected environmental state

  11. NPP operation and modern high technologies

    International Nuclear Information System (INIS)

    Kuznetsov, V.V.

    1992-01-01

    Examples are considered of modern high technology introduction into daily practice of NPP operation, namely: satellite communication systems, robots, non-destructive testing, optical-fiber techniques, laser measuring means and others

  12. Krsko NPP Periodic Safety Review program

    International Nuclear Information System (INIS)

    Basic, I.; Spiler, J.; Novsak, M.

    2001-01-01

    The need for conducting a Periodic Safety Review for the Krsko NPP has been clearly recognized both by the NEK and the regulator (SNSA). The PSR would be highly desirable both in the light of current trends in safety oversight practices and because of many benefits it is capable to provide. On January 11, 2001 the SNSA issued a decision requesting the Krsko NPP to prepare a program and determine a schedule for the implementation of the program for 'Periodic Safety Review of NPP Krsko'. The program, which is required to be in accordance with the IAEA safety philosophy and with the EU practice, was submitted for the approval to the SNSA by the end of March 2001. The paper summarizes Krsko NPP Periodic Safety Review Program [1] including implemented SNSA and IAEA Expert Mission comments.(author)

  13. NPP A-1 decommissioning - Phase I

    International Nuclear Information System (INIS)

    Krstenik, A.; Blazek, J.

    2000-01-01

    Nuclear power plant A-1 with output 150 MW e , with metallic natural uranium fuelled, CO 2 cooled and heavy water moderated reactor had been prematurely finally shut down in 1977. It is necessary to mention that neither operator nor regulatory and other authorities have been prepared for the solution of such situation. During next two consecutive years after shutdown main effort of operator focused on technical and administrative activities which are described in the previous paper together with approach, condition and constraints for NPP A-1 decommissioning as well as the work and research carried out up to the development and approval of the Project for NPP A-1 decommissioning - I. phase. Subject of this paper is description of: (1) An approach to NPP A -1 decommissioning; (2) An approach to development of the project for NPP A-1 decommissioning; (3) Project - tasks, scope, objectives; (4) Mode of the Project realisation; (5) Progress achieved up to the 1999 year. (authors)

  14. Nuclear Power Plant (NPP) safety in Brazil

    International Nuclear Information System (INIS)

    Lederman, L.

    1980-01-01

    The multidisciplinary aspects of the activities involved in the nuclear power plant (NPP) licensing, are presented. The activities of CNEN's technical staff in the licensing of Angra-1 and Angra-2 power plants are shown. (E.G.) [pt

  15. Cuba: Juragua NPP. Project Control. Annex 5

    International Nuclear Information System (INIS)

    Serradet, M.A.

    1999-01-01

    This annex deals with project control. The long suspension of Juragua NPP has affected personnel, equipment and site structures. Efforts are being made to revive the plant and to protect existing resources (assets). An action plan has been prepared. (author)

  16. Training human resource for NPP in Vietnam

    International Nuclear Information System (INIS)

    Nguyen, Trung Tinh; Dam, Xuan Hiep

    2008-01-01

    Vietnam will establish the first NPP in the near future. With us the first important thing is the human resource, but now there is no university in Vietnam training nuclear engineers. In EPU (Electric Power University), now we are preparing for training nuclear engineers. In this paper, we review the nuclear man power and the way to train the high quality human resource for NPP and for other nuclear application in Vietnam. (author)

  17. Heat delivery from Bohunice NPP, Slovakia

    International Nuclear Information System (INIS)

    Paley, I.

    1998-01-01

    Experience with nuclear district heating in the Slovak Republic is reported. The heating system of the town of Trnava is supplied by the Bohunice NPP and conventional sources. Construction of the hot water heating system from the Bohunice NPP began in 1983. Commercial operation began on 10 December 1987. Heat delivery has gradually increased from 478 TJ in 1988, to 1,104 TJ in 1995. The heat cost is low, resulting in an increasing number of consumers. (author)

  18. Radionuclide localization at the Chernobyl' NPP territory

    International Nuclear Information System (INIS)

    Mamaev, L.A.; Galkin, G.A.; Khrabrov, S.L.; Polyakov, A.S.; Mikhejkin, S.V.

    1989-01-01

    Experience is generalized of using different dust suppression (DS) compounds during Chernobyl' accident consequence elimination. Polymer DS compounds were used at the NPP operating site; the compounds kept dust-like radioactive contaminations during 1-2 months. DS at the country was realized by means of the compound on base of latex. The conclusion is made that the DS measures improved radiation situation in the NPP zone. 7 refs

  19. Knowledge Management and Organizational Proficiency with NPP

    International Nuclear Information System (INIS)

    Marler, M.

    2016-01-01

    Full text: The pace of new NPP construction, startup, and operation is straining the supply of proficient operators, technicians, and engineers. This technical brief explains an approach implemented by a US nuclear utility to capture and transfer knowledge possessed by proficient workers to new workers using the VISION learning content management system. This approach could also be used to accelerate worker proficiency in new NPP organizations. (author

  20. Suomi NPP Ground System Performance

    Science.gov (United States)

    Grant, K. D.; Bergeron, C.

    2013-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). JPSS will replace the afternoon orbit component and ground processing system of the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA. The JPSS satellites will carry a suite of sensors designed to collect meteorological, oceanographic, climatological and geophysical observations of the Earth. The first satellite in the JPSS constellation, known as the Suomi National Polar-orbiting Partnership (Suomi NPP) satellite, was launched on 28 October 2011, and is currently undergoing product calibration and validation activities. As products reach a beta level of maturity, they are made available to the community through NOAA's Comprehensive Large Array-data Stewardship System (CLASS). CGS's data processing capability processes the satellite data from the Joint Polar Satellite System satellites to provide environmental data products (including Sensor Data Records (SDRs) and Environmental Data Records (EDRs)) to NOAA and Department of Defense (DoD) processing centers operated by the United States government. CGS is currently processing and delivering SDRs and EDRs for Suomi NPP and will continue through the lifetime of the Joint Polar Satellite System programs. Following the launch and sensor activation phase of the Suomi NPP mission, full volume data traffic is now flowing from the satellite through CGS's C3, data processing, and data delivery systems. Ground system performance is critical for this operational system. As part of early system checkout, Raytheon measured all aspects of data acquisition, routing, processing, and delivery to ensure operational performance requirements are met, and will continue to be met throughout the mission. Raytheon developed a tool to measure, categorize, and

  1. Operation Aspect of the Main Control Room of NPP

    International Nuclear Information System (INIS)

    Sahala M Lumbanraja

    2009-01-01

    The main control room of Nuclear Power Plant (NPP) is operational centre to control all of the operation activity of NPP. NPP must be operated carefully and safely. Many aspect that contributed to operation of NPP, such as man power whose operated, technology type used, ergonomic of main control room, operational management, etc. The disturbances of communication in control room must be anticipated so the high availability of NPP can be achieved. The ergonomic of the NPP control room that will be used in Indonesia must be designed suitable to anthropometric of Indonesia society. (author)

  2. Decommissioning Study of Oskarshamn NPP

    International Nuclear Information System (INIS)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  3. Decommissioning study of Forsmark NPP

    International Nuclear Information System (INIS)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias

    2013-06-01

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding

  4. ORSEC technological risks, Blayais NPP

    International Nuclear Information System (INIS)

    2016-01-01

    The Particular intervention plan (PPI in French) is an emergency plan which foresees the measures and means to be implemented to address the potential risks of the presence and operation of a nuclear facility. This plan is implemented and developed by the Prefect in case of nuclear accident (or incident leading to a potential accident), the impact of which extending beyond the facility perimeter. It represents a special section of the organisation plan for civil protection response (ORSEC plan). The PPI foresees the necessary measures and means for crisis management during the first hours following the accident and is triggered by the Department Prefect according to the information provided by the facility operator. Its aim is to protect the populations leaving within 10 km of the facility against a potential radiological hazard. The PPI describes: the facility, the intervention area, the protection measures for the population, the conditions of emergency plan triggering, the crisis organisation, the action forms of the different services, and the post-accident stage. This document is the public version of the Particular intervention plan of the Blayais NPP (Gironde, France)

  5. Decommissioning Study of Oskarshamn NPP

    Energy Technology Data Exchange (ETDEWEB)

    Larsson, Helena; Anunti, Aake; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for Oskarshamn NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  6. Decommissioning study of Forsmark NPP

    Energy Technology Data Exchange (ETDEWEB)

    Anunti, Aake; Larsson, Helena; Edelborg, Mathias [Westinghouse Electric Sweden AB, Vaesteraas (Sweden)

    2013-06-15

    By Swedish law it is the obligation of the nuclear power utilities to satisfactorily demonstrate how a nuclear power plant can be safely decommissioned and dismantled when it is no longer in service as well as calculate the estimated cost of decommissioning of the nuclear power plant. Svensk Kaernbraenslehantering AB (SKB) has been commissioned by the Swedish nuclear power utilities to meet the requirements of current legislation by studying and reporting on suitable technologies and by estimating the costs of decommissioning and dismantling of the Swedish nuclear power plants. The present report is an overview, containing the necessary information to meet the above needs, for the Forsmark NPP. Information is given for the plant about the inventory of materials and radioactivity at the time for final shutdown. A feasible technique for dismantling is presented and the waste management is described and the resulting waste quantities are estimated. Finally a schedule for the decommissioning phase is given and the costs associated are estimated as a basis for funding.

  7. Changing NPP consumption patterns in the Holocene: from Megafauna "liberated" NPP to "ecological bankruptcy"

    Science.gov (United States)

    Doughty, C.

    2015-12-01

    There have been vast changes in how net primary production (NPP) is consumed by humans and animals during the Holocene beginning with a potential increase in availability following the Pleistocene megafauna extinctions. This was followed by the development of agriculture which began to gradually restrict availability of NPP for wild animals. Finally, humans entered the industrial era using non-plant based energies to power societies. Here I ask the following questions about these three energy transitions: 1. How much NPP energy may have become available following the megafauna extinctions? 2. When did humans, through agriculture and domestic animals, consume more NPP than wild mammals in each country? 3. When did humans and wild mammals use more energy than was available in total NPP in each country? To answer this last question I calculate NPP consumed by wild animals, crops, livestock, and energy use (all converted to units of MJ) and compare this with the total potential NPP (also in MJ) for each country. We develop the term "ecological bankruptcy" to refer to the level of consumption where not all energy needs can be met by the country's NPP. Currently, 82 countries and a net population of 5.4 billion are in the state of ecologically bankruptcy, crossing this threshold at various times over the past 40 years. By contrast, only 52 countries with a net population of 1.2 billion remain ecologically solvent. Overall, the Holocene has seen remarkable changes in consumption patterns of NPP, passing through three distinct phases. Humans began in a world where there was 1.6-4.1% unclaimed NPP to consume. From 1700-1850, humans began to consume more than wild animals (globally averaged). At present, >82% of people live in countries where not even all available plant matter could satisfy our energy demands.

  8. Report of the OSART (Operational Safety Review Team) mission to the Ignalina, units 1 and 5 nuclear power plant Republic of Lithuania 4 to 22 September 1995

    International Nuclear Information System (INIS)

    1996-03-01

    This report presents the results of the IAEA Operational Safety Review Team (OSART) review of Ignalina nuclear power plant in Lithuania. It describes recommendations and suggestions for improvements affecting operational safety provided to the responsible Lithuanian authorities for consideration and also describes a good practice for consideration by other nuclear power plants. Distribution of this OSART report is at the discretion of the Government of Lithuania and, until it is derestricted, the IAEA will make the report available to third parties only with the express permission of the Government of Lithuania. Any use of, or reference to, this report that may be made by the competent Lithuanian organizations is solely their responsibility

  9. Automatic control system at the ''Loviisa'' NPP

    International Nuclear Information System (INIS)

    Kukhtevich, I.V.; Mal'tsev, B.K.; Sergievskaya, E.N.

    1980-01-01

    Automatic control system of the Loviisa-1 NPP (Finland) is described. According to operation conditions of Finland power system the Loviisa-1 NPP must operate in the mode of week and day control of loading schedule and participate in current control of power system frequency and capacity. With provision for these requirements NPP is equipped with the all-regime system for automatic control functioning during reactor start-up, shut-down, in normal and transient regimes and in emergency situations. The automatic control system includes: a data subsystem, an automatic control subsystem, a discrete control subsystem including remote, a subsystem for reactor control and protection and overall station system of protections: control and dosimetry inside the reactor. Structures of a data-computer complex, discrete control subsystems, reactor control and protection systems, neutron flux control system, inside-reactor control system, station protection system and system for control of fuel element tightness are presented in short. Two-year experience of the NPP operation confirmed advisability of the chosen volume of automatization. The Loviisa-1 NPP operates successfully in the mode of the week and day control of supervisor schedule and current control of frequency (short-term control)

  10. Environmental impact of the NPP Krsko

    International Nuclear Information System (INIS)

    Novosel, N.

    1996-01-01

    The Ministry of Economic Affairs has for six years now been monitoring the operation of the Krsko NPP (NEK) and its impact on the environment. A bulletin titled 'NEK - Energy and Environment' is being issued every three months. It contains information on operation of the Krsko NPP for the previous three months, a graph of duration of temperature increase of water in the Sava river (delta T) in that period, an assessment of the radiological impact of Krsko NPP on the environment through an equivalent dose cumulatively throughout the calendar year, and a short current text related to Krsko NPP. The Ministry of Economic Affairs organizes a press conference on every issue of the bulletin, as an attempt of introducing this subject to the media and to the public. This paper contains a review of information given in the NEK bulletin from 1990 to 1995 with a special emphasis on the contribution of the Krsko NPP to the artificially caused radiation on the border between the Republic of croatia and the Republic of Slovenia. (author)

  11. Integrated ageing management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos; Sabransky, Mario

    2013-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  12. Integrated Ageing Management of Atucha NPP

    International Nuclear Information System (INIS)

    Ranalli, J.M.; Marchena, M.H.; Zorrilla, J.R.; Sabransky, M.

    2012-01-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor twice as big as Atucha I finishing a delayed construction . With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  13. Integrated ageing management of Atucha NPP

    Energy Technology Data Exchange (ETDEWEB)

    Ranalli, Juan M.; Marchena, Martin H.; Zorrilla, Jorge R.; Antonaccio, Elvio E.; Brenna, Pablo; Yllanez, Daniela; Cruz, Gerardo Vera de la; Luraschi, Carlos, E-mail: ranalli@cnea.gov.ar [Gerencia Coordinacion Proyectos CNEA-NASA, Comision Nacional de Energia Atomica, Buenos Aires (Argentina); Sabransky, Mario, E-mail: msabransky@na-sa.com.ar [Departamento Gestion de Envejecimiento, Central Nuclear Atucha I-II Nucleoelectrica Argentina S.A., Provincia de Buenos Aires (Argentina)

    2013-07-01

    Atucha NPP is a two PHWR unit site located in Lima, Province of Buenos Aires, 120 km north of Buenos Aires, Argentina. Until recent, the site was split in Atucha I NPP, a 350 MW pressure vessel heavy water reactor in operation since 1974; and Atucha II, a similar design reactor, twice as big as Atucha I finishing a delayed construction. With the start-up of Atucha II and aiming to integrate the management of the plants, the Utility (Nucleolectrica Argentina Sociedad Anonima - NASA) has reorganized its operation units. Within this reorganization, an Ageing Management Department has been created to cope with all ageing issues of both Atucha I and II units. The Atomic Energy Commission of Argentina (Comision Nacional de Energia Atomica - CNEA) is a state-owned R and D organization that; among other functions such as designing and building research reactors, developing uranium mining and supplying radioisotopes to the medical market; is in charge of providing support and technological update to all Argentinean NPPs. The Ageing Management Department of Atucha NPP and the Ageing Management Division of CNEA has formed a joint working group in order to set up an Integrated Ageing Management Program for Atucha NPP following IAEA guidelines. In the present work a summary of the activities, documental structure and first outputs of the Integrated Ageing Management Program of Atucha NPP is presented. (author)

  14. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  15. Regulatory aspects of NPP safety

    International Nuclear Information System (INIS)

    Stuller, J.; Brandejs, P.; Miasnikov, A.; Svab, M.

    1999-01-01

    In beginning, a history of legislative process regulating industrial utilisation of nuclear energy is given, including detailed list of decrees issued by the first regulatory body supervising Czech nuclear installations - Czechoslovak Atomic Energy Commission (CSKAE). Current status of nuclear regulations and radiation protection, especially in connection with Atomic Act (Act No 18/1997 Coll.), is described. The Atomic Act transfers into the Czech legal system a number of obligations following from the Vienna Convention on Civil Liability for Nuclear Damage and Joint Protocol relating to the Application of the Vienna and Paris Convention, to which the Czech Republic had acceded. Actual duties and competence of current nuclear regulatory body - State Office for Nuclear Safety (SUJB) - are given in detail. Execution of the State supervision of peaceful utilisation of nuclear energy and ionising radiation is laid out in several articles of the Act, which comprises: control activities of the SUJB, remedial measures, penalties. Material and human resources are sufficient for fulfilment of the basic functions for which SUJB is authorised by the law. For 1998, the SUJB allotted staff of 149, approximately 2/3 of that number are nuclear safety and radiation protection inspectors. The SUJB budget for 1998 is approximately 180 million Czech crowns (roughly 6 million US dollars). Inspection activity of SUJB is carried out in three different ways: routine inspections, planned specialised inspections, inspections as a response to a certain situation (ad-hoc inspections). Approach to the licensing of major plant upgrades and backfittings are mainly illustrated on the Temelin NPP licensing. Regulatory position and practices concerning review activities are presented. (author)

  16. A strategy for upgrading management of spent fuel and radioactive waste at the Ignalina nuclear power plant

    International Nuclear Information System (INIS)

    Balan, V.; Penkov, V.; Bergman, C.; Gustafsson, B.

    2001-01-01

    The waste management strategy of the former Soviet Union, based on its Norms and Rules, was implemented at Ignalina nuclear power Plant (INPP). This means in brief that the spent nuclear fuel (SNF) should be reprocessed in the Soviet Union and the management of radioactive waste should be done in connection with the eventual decommissioning of the reactors, The major facilities for management of radioactive waste were evaporation of liquid waste and subsequent bitumenisation of the sludge, treatment of liquid with ion-exchange techniques and subsequent storage of the resins in tanks. Solid waste was sorted according to its activity content and stored on site. Following the independence of Lithuania in 1990, Lithuania is successively replacing the former Norms and Rules with Lithuanian laws and regulations. Lithuania has signed both the Convention of Nuclear Safety and the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. The paper will give an overview of the work done, in progress and planned, primarily from an operational point of view. It will give examples of practical problems which have to be overcome and how very tough prioritisation has to be made because of lack of resources. Many of the problems are associated with the fact that the waste management strategy successively has to be changed at the same time as the generation of SNF and radioactive waste is continued. A lot has already been achieved, especially regarding the SNF. However, the main work is still to be done until the INPP can declare that its waste is properly managed in full compliance with a national waste management strategy which eventually will end with the disposal in licensed repositories. (author)

  17. Research on the NPP human factors engineering operating experience review

    International Nuclear Information System (INIS)

    Ren Xiangchen; Miao Hongxing; Ning Zhonghe

    2006-01-01

    This paper addresses the importance of the human factors engineering (HFE) for the design of nuclear power plant (NPP), especially for the design of human-machine interface in the NPP. It also summarizes the scope and content of the NPP HFE. The function, scope, content and process of the NPP human factors engineering operating experience review (OER) are mainly focused on, and significantly discussed. Finally, it briefly introduces the situation of the studies on the OER in China. (authors)

  18. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  19. New trends in designing NPP control boards

    International Nuclear Information System (INIS)

    Kondrat'ev, V.V.

    1981-01-01

    A short analytical summary of the latest developments and future trends in designing NPP control boards is given. The designs of the Westinghause and the Hynkley-Point NPP control boards are described in detail. The essence of the advanced control board concept consists , firstly, in expanded use of computer-controlled displays for the sake of reducing the content of unimportant information presented to an operator, and, secondary, in better account of human possibilities to convert the NPP operation information into a more suitable form. An enlarged use of the direct digital reactor control utilizing microprocessors is expected. Besides, the employment of full-scale control board mock-ups and information desks as well as testing newly-developed control boards at computer reactor simulators are concluded to be used at all-growing rate [ru

  20. Qinshan NPP large break LOCA safety analysis

    International Nuclear Information System (INIS)

    Shi Guobao; Tang Jiahuan; Zhou Quanfu; Wang Yangding

    1997-01-01

    Qinshan NPP is the first nuclear power plant in the mainland of China, a 300 MW(e) two-loop PWR. Large break LOCA is the design-basis accident of Qinshan NPP. Based on available computer codes, the own analysis method which complies with Appendix k of 10 CFR 50 has been established. The RELAP4/MOD7 code is employed for the calculations of blowdown, refill and reflood phase of the RCS respectively. The CONTEMPT-LT/028 code is used for the containment pressure and temperature analysis. The temperature transient in the hot rod is calculated using the FRAP-6T code. Conservative initial and functional assumptions were adopted during Qinshan NPP large break LOCA analysis. The results of the analysis show the applicable acceptance criteria for the loss-of-coolant accident are met

  1. Safeguards at Kozloduy NPP - Experience and expectations

    International Nuclear Information System (INIS)

    Elenkov, Todor

    2001-01-01

    Bulgaria is a party of Non Proliferation Treaty since 5 September 1969. The agreement between IAEA and Bulgaria - INFCIRC 178 - has been in force since 29 February 1972. At that time Bulgaria had one research reactor IRT-2000 in Sofia and two power reactors of WWER-440 type under construction. Now at Kozloduy NPP site there are 4 facilities, which consist of 4 WWER-440 and 2 WWER-1000 type power reactors, producing almost 50% of the electricity in Bulgaria and 1 wet away from reactor spent fuel storage. In 1991 under the green movements and social pressure, the research reactor in Sofia was closed and the construction of the second NPP in Belene with 2 WWER-1000 type reactors was halted. After the transfer in 1994 of the fresh fuel from the research reactor to Kozloduy due to security reasons practically NPP Kozloduy remains the only significant (from safeguards point of view) nuclear site in Bulgaria. In 1972 a 'Nuclear Fuel' group was formed at the Physicists Department in NPP Kozloduy with responsibilities to carry out for safeguards records and reports, fresh and spent fuel transport and control. In 1990 this group was transferred to the Safety Section and since 1992 it exists as 'Control and Accounting for of the Nuclear Materials' - a section in the Safety Department. Currently the section serves all four facilities in NPP Kozloduy and has four people: section head, chief inspector and two inspectors. The main activities of the section include: a) Control of the nuclear fuel location as well as meeting the storage and transport conditions regulations; b) Control of the conditions for normal operations of the installed IAEA surveillance systems; c) Preparation of documents for licensing of fresh and spent nuclear fuel transport; d) Preparation of the official information on nuclear materials location and quantity; e) Preparation of accounting records and the reports for IAEA (ICR, PIL, MBR); f) Co-ordination of the IAEA safeguards inspection activities at NPP

  2. Reactor plant for Belene NPP completion

    International Nuclear Information System (INIS)

    Dragunov, Yu. G.; Ryzhov, S. B.; Ermakov, D. N.; Repin, A. I.

    2004-01-01

    Construction of 'Belene' NPP was started at the end of 80-ties using project U-87 with V-320 reactor plant, general designer of this plant is OKB 'Gidropress'. At the beginning of 90-ties, on completing the considerable number of deliveries and performance of civil engineering work at the site the NPP construction was suspended. Nowadays, considering the state of affairs at the site and the work performed by Bulgarian Party on preservation of the equipment delivered, the most perspective is supposed to be implementation of the following versions in completing 'Belene' NPP: for completion of Unit 1 - reactor plant VVER-1000 on the basis of V-320 reactor with the maximum use of the delivered equipment (V-320M) having the extended service life and safety improvement; for Unit 2 - advanced reactor plant VVER-1000. For the upgraded reactor plant V-230M the basic solutions and characteristics are presented, as well as the calculated justification of strength and safety analyses, design of the reactor core and fuel cycle, instrumentation and control systems, application of the 'leak-before break' in the project and implementation of safety measures. For the modernised reactor plant V-392M the main characteristics and basic changes are presented, concerning reactor pressure vessel, steam generator, reactor coolant pump set. Design of NPP with the modernized reactor plant V-320M meets the up-to-date requirements and can be licensed for completion and operation. In the design of NPP with the advanced reactor plant the basic solutions and the equipment are used that are similar to those used in standard reactor plant V-320 and new one with VVER-1000 under construction and completion in Russia, and abroad. Compliance of reactor design with the up-to-date international requirements, considering the extended service life of the main equipment, shows its rather high potential for implementation during completion of 'Belene' NPP

  3. Overview of Cernavoda NPP training programme

    International Nuclear Information System (INIS)

    Valache, Cornelia

    2005-01-01

    Full text: The paper presents a general assessment of Cernavoda NPP personnel training programme, highlighting the role of training in human performance improvement. Cernavoda NPP Personnel Training and Authorization Department (PTAD) is the one responsible for the training of Unit 1 and 2 staff. PTAD is structured in such a manner as to support and respond to all Cernavoda NPP training, qualification and authorization requirements. The training of personnel is continuously adapted based on IAEA Guides and INPO/WANO recommendations, to keep with world standards, based on the internal and external reviews. At Cernavoda NPP the Training Concept and the Training Programmes are based on SAT - Systematic Approach to Training. The Training Concept is established on a set of training documents (RD's, SI's, IDP's), which address all the SAT phases: Analysis, Design, Development, Implementation and Evaluation. The Training Programmes are structured on the initial and continuing personnel training. Their content and goals respond to the training specific needs for each plant major job family. In order to successfully support NPP training programmes, CNPP training center has upgraded classrooms with new presentation facilities and there are plans to expand the space of the building, to develop additional operator and maintenance skills facilities. There are also a number of general areas for improvement of PTAD activity, such as operators and maintenance training, initial and continuing training of both Unit 1 and 2 staff. By responding in a timely and completely manner to all plant training requirements PTAD will help in rising human performance of Cernavoda NPP personnel, supporting the safe, efficient and cost effective production of power. (author)

  4. Perspectives of NPP personnel training in the future?

    International Nuclear Information System (INIS)

    Khess, R.E.

    1996-01-01

    Problems of the NPP personnel education are discussed during radical reorganization of the state regulation of energy production and distribution when nuclear energetics will appears in the market conditions. Effective methods of the NPP personnel training developed by the corporation GPU Nuclear are given. Potentials of the application of simulators and computerized programs for increasing the NPP personnel education efficiency are considered

  5. Organization of monitoring of agricultural products in NPP region

    International Nuclear Information System (INIS)

    Panteleev, L.I.; Spirin, E.V.; Sanzharova, N.I.

    1990-01-01

    Problem of organizing chemical and radiation monitoring of agricultural products in NPP region is considered. Attention is paid to monitoring during NPP siting and designing, to monitoring of radioactive contamination of agricultural products under normal NPP operation, emergency situations and decommissioning

  6. Current status of Chernobyl NPP decommissioning

    International Nuclear Information System (INIS)

    2009-01-01

    Strategy of Chernobyl NPP decommissioning with the decommissioning license 2002-2064 is presented. The main activities at the stage of ChNPP units shutdown (2002 - 2012) are: units maintenance in safe state; decommissioning infrastructure construction; unloading of SNF – main activity determining the stage duration; systems and elements final shutdown; decommissioning life-support systems reconstruction; Comprehensive engineering and radiation survey (CERS); dismantling of the reactor facilities external equipment; removal of RAW from units; decommissioning documentation development. The decommissioning activities main results are presented

  7. Radioactive waste problems in the Kozloduy NPP

    International Nuclear Information System (INIS)

    Videnov, N.; Stanchev, V.

    1995-01-01

    An average volume of 1400 m 3 a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed

  8. NPP Krsko natural circulation performance evaluation

    International Nuclear Information System (INIS)

    Segon, Velimir; Bajs, Tomislav; Frogheri, Monica

    1999-01-01

    The present document deals with an evaluation of the natural circulation performance of the Krsko nuclear power plant. Two calculation have been performed using the NPP Krsko nodalization (both similar to the LOBI A2-77 natural circulation experiment) - the first with the present steam generators at NPP Krsko (Westinghouse, 18% plugged), the second with the future steam generators (Siemens, 0% plugged). The results were evaluated using the natural circulation flow map derived in /1/, and were compared to evaluate the influence of the new steam generators on the natural circulation performance. (author)

  9. Low-water considerations for NPP sites

    International Nuclear Information System (INIS)

    Jensen, J.; Frank, T.; Wahl, T.

    2009-01-01

    In the frame of reactor safety considerations flood protection and the evaluation of low-water events are safety relevant issues. Therefore low-water statistics were performed for the coastal region Cuxhaven and the Elbe river estuary. The consideration of the longitudinal profile of water levels during low-tide in connection with surface water effects, morphodynamic changes of the river and anthropogenic modifications is of importance for conclusions concerning the NPP sites in some distance of the reference tide gauge. The authors performed a statistical low-tide analysis for the NPP sites Brunsbuettel and Brokdorf.

  10. Knowledge management during decommissioning of Chornobyl NPP

    International Nuclear Information System (INIS)

    Gora, A.D.; Kuchinskij, V.K.; Stel'makh, D.A.; Tsivun, T.A.

    2010-01-01

    The article deals with issues on knowledge management during decommissioning by the example of the Chornobyl NPP. This includes how the duration of decommissioning stage, change in organization goal and final state of the site influence on human resources and knowledge management system. The main attention is focused on human assets and intellectual strength of Chornobyl NPP. Mathematical dependencies are proposed to substantiate numerical values. An analysis is given for the current situation, and forecast estimates for values dynamics is performed. The conclusion gives solutions on providing experienced staff in the future.

  11. Radioactive waste problems in the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Videnov, N; Stanchev, V [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1996-12-31

    An average volume of 1400 m{sup 3} a year of solid radioactive waste (RAW) is generated in the Kozloduy NPP. The adopted waste processing sequence is collection, sorting and compaction with a 1000 tons force providing decrease in volume by factor of 15. A temporary storage facility at the Kozloduy NPP is licensed by ISUAE and CPPUAE. The treatment of liquid wastes is performed by Westinghouse formula and a technology using an automated solidification system. Contaminated oils are burned using an oil incinerator. A special 2-year programme for RAW management is being developed.

  12. Medical consequences of NPP and TPP operation

    International Nuclear Information System (INIS)

    Bliznakov, V.

    1996-01-01

    Results from a comparative analysis of health conditions of the staff in the Kozloduy NPP and the Maritsa Iztok TPP are reported. It is found that the general disease incidence with temporary incapacity for work of Kozloduy workers is lower than those data for the workers at thermal power stations. The incidence of some social diseases like neoplasms, TBC, hypertension, ischemia etc. is also lower for the staff of NPP. No cases of radiation injuries have been registered for a period of 21 years

  13. Nuclear fuel operation at Balakovo NPP

    International Nuclear Information System (INIS)

    Morozov, A.

    2015-01-01

    The presentation addressed the positive experience of the TVS-2M assemblies implementation at Balakovo NPP in 18 month fuel cycles, at uprated power (104%) and the usage of the axial profiled Gd-rods in order to minimize the power peaking factors and linear heat rate in the upper part in some of the fuel rods. The results of the test operation of fuel rods with different claddings, made by E110M, E125 and E635M alloys at Balakovo NPP were also provided. The recently observed problem with the “white crust” on the cladding surfaces was also discussed

  14. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  15. Lifetime evaluation of Bohunice NPP components

    International Nuclear Information System (INIS)

    Kupca, L.

    2001-01-01

    The paper discuss some aspects of the main primary components lifetime evaluation program in Bohunice NPP which is performed by Nuclear Power Plant Research Institute (NPPRI) Trnava in cooperation with Bohunice and other organizations involved. Facts presented here are based on the NPPRI research report which is regularly issued after each reactor fuel campaign under conditions of project resulted from the contract between NPPRI and Bohunice NPP. For the calculations, there has been used some computer codes adapted (or made) by NPPRI and the results are just the conclusive and very brief, presented here in Tables (Figures). (authors)

  16. NPP Krsko small break LOCA analysis

    International Nuclear Information System (INIS)

    Mavko, B.; Petelin, S.; Peterlin, G.

    1987-01-01

    Parametric analysis of small break loss of coolant accident for the Krsko NPP was calculated by using RELAP5/MOD1 computer code. The model that was used in our calculations has been improved over several years and was previously tested in simulation (s) of start-up tests and known NPP Krsko transients. In our calculations we modelled automatic actions initiated by control, safety and protection systems. We also modelled the required operator actions as specified in emergency operating instructions. In small-break LOCA calculations, we varied break sizes in the cold leg. The influence of steam generator tube plugging on small break LOCA accidents was also analysed. (author)

  17. External flood probabilistic safety analysis of a coastal NPP

    International Nuclear Information System (INIS)

    Pisharady, Ajai S.; Chakraborty, M.K.; Acharya, Sourav; Roshan, A.D.; Bishnoi, L.R.

    2015-01-01

    External events pose a definitive challenge to safety of NPP, solely due to their ability to induce common cause failures. Flooding incidents at Le Blayais NPP, France, Fort Calhoun NPP, USA and Fukushima Daiichi have pointed to the importance of external flooding as an important contributor to NPP risk. A methodology developed for external flood PSA of a coastal NPP vulnerable to flooding due to tsunami, cyclonic storm and intense local precipitation is presented in this paper. Different tasks for EFPSA has been identified along with general approach for completing each task

  18. Principles of tariff determination for NPP electric power generation

    International Nuclear Information System (INIS)

    Ratnikov, B.E.; Gitel'man, L.D.; Artemov, Yu.N.; Fiantsev, V.S.

    1988-01-01

    Foundations of price-setting and order of accounting arrangement for NPP electric power are considered. NPP tariffs are established proceeding from standard costs of power generation. The standards are differentiated as to NPP groups, depending on technical, regional and natural geographic factors, taking into account the facility type, unit capacity and the number of similar NPP units. The conclusion is made that under conditions of NPP economic independence expansion and creation of prerequisites for going over to self-financing principles and also due to the qualitatively new stage of nuclear power generation development the level of efficiency, forseen by the tariffs, should be increased

  19. Akkuyu NPP – the first Turkish NPP. The new history of the project

    International Nuclear Information System (INIS)

    Tzocheva, V.

    2012-01-01

    An overview is given to the Turkish energy sector and nuclear power plans. The project for the construction of the first NPP in Turkey is presented. The general parameters of the Project are: CAPEX: $ 20 bln; Project design: NPP-2006; (VVER- 1200); Number of units: 4; Total capacity: 4 800 MW; Construction period: 2014 – 2023; PPA period; 15 years, fixed price terms. An account of the activities during 2011, the Worley Parsons participation are presented and a tentative project schedule is given

  20. Radioactive source management in Daya Bay NPP

    International Nuclear Information System (INIS)

    Mao Chun Yang

    2000-01-01

    'Small sources causes big accidents' had occurred worldwide many times. Radioactive source management in Nuclear Power Plant in very important for its safety record. This paper introduces the way and experience of radioactive source management in Daya Bay NPP from aspects of clarifying the responsibilities, centralizing the management of high radioactivity sources, work process management and experience feedback etc. (author)

  1. Safety upgrading of Bohunice V1 NPP

    International Nuclear Information System (INIS)

    2001-01-01

    This CD is multimedia presentation of programme safety upgrading of Bohunice V1 NPP. It consist of next chapters: (1) Introductory speeches; (2) Nuclear power plant WWER 440; (3) Safety improvement; (4) Bohunice Nuclear power plants subsidiary; (5) Siemens; (6) REKON; (7) VUJE Trnava, Inc. - Engineering, Design and Research Organisation; (8) Album

  2. NPP Mochovce - a project of extraordinay significance

    International Nuclear Information System (INIS)

    Chwolik, I.; Debru, M.

    2000-01-01

    In this paper and in this presentation the reactor safety upgrading of two blocks of the NPP V-1 Bohunice, some results of participation on safety upgrading by the German-French consortium EUCOM (Framatome and Siemens-KWU) are presented. (author)

  3. Jose Cabrera NPP severe accident management activities

    International Nuclear Information System (INIS)

    Blanco, J.; Almeida, P.; Saiz, J.; Sastre, J.L.; Delgado, R.

    1998-01-01

    To prepare a common acting plan with respect to Severe Accident Management, in 1994 was founded the severe accident management ''ad-hoc'' working group from the Spanish Westinghouse PWR Nuclear Power Plant Owners Group. In this group actively collaborated the Jose Cabrera NPP Training Centre and the Department of Nuclear Engineering of UNION FENOSA. From this moment, Jose Cabrera NPP began the planning of its specific Severe Accident Management Program, which main point are Severe Accident Management Guidelines (SAMG). To elaborate this guidelines, the Spanish translation of Westinghouse Owners Group (WOG) Severe Accident Management Guidelines were considered the reference documents. The implementation of this Guidelines to Jose Cabrera NPP started on January 1997. Once the specific guidelines have been implemented to the plant, training activities for the personnel involved in severe accident issues will be developed. To prepare the training exercises MAAP4 code will be used, and with this intention, a specific Jose Cabrera NPP MAAP-GRAAPH screen has been developed. Furthermore, a wide selection of MAAP input files for the simulation of different scenarios and accidental events is available. (Author)

  4. External hazards considered for Paks NPP

    International Nuclear Information System (INIS)

    Kiss, Tibor

    2000-01-01

    PAKS NPP was built according to Soviet construction standards which took into account meteorological aspects but no documents for other external hazards were available. Main activities concerning earthquakes cover reevaluation of the plant site, seismic safety technological concept, improving the seismic resistance, installation of seismic monitoring and protection system, and seismic PSA

  5. Maintenance training centre at NPP Paks, Hungary

    International Nuclear Information System (INIS)

    Babos, K.

    1996-01-01

    The lecture shows the feature of WWER-440/213 units maintenance, the existing maintenance training system, the necessity of the change in maintenance training system at NPP Paks. The author introduces the would-be maintenance training centre, the training facilities and the main tasks related to the maintenance training. (author)

  6. Safety culture development at Daya Bay NPP

    International Nuclear Information System (INIS)

    Zhang Shanming

    2001-01-01

    From view on Organization Behavior theory, the concept, development and affecting factors of safety culture are introduced. The focuses are on the establishment, development and management practice for safety culture at Daya Bay NPP. A strong safety culture, also demonstrated, has contributed greatly to improving performance at Daya Bay

  7. Operational experiences feedback in Bohunice NPP

    Energy Technology Data Exchange (ETDEWEB)

    Betak, A [NPP Bohunice (Slovakia)

    1997-10-01

    The presentation reviews the following issues: OEF team in Bohunice NPP - structure; training and qualification: ASSET seminars on Prevention of incidents - INES manual handling, NRA-NRC the training on event investigation methods, NU - the training on HPES; legislation - documentation prepared in the frame of QA programme; results of OEF team activities; ASSET mission Dukovany - Experiences; the perspective activities.

  8. Development of the NPP Kozloduy informational system

    Energy Technology Data Exchange (ETDEWEB)

    Katsarov, Y; Manchev, B [Risk Engineering Ltd., Sofia (Bulgaria)

    1996-12-31

    A unified computer system to be implemented in the Kozloduy NPP is described. It allows to generate all general indicators and documents for plant operation needed according to the national regulation and WANO Performance Indicators. The system combines multi-purpose data collection with probabilistic analysis, evaluation of the human factor and optimization of the regulated verification of the equipment. 3 refs.

  9. NPP radioactive waste processing and solidification

    International Nuclear Information System (INIS)

    Nikiforov, A.S.; Polyakov, A.S.; Zakharova, K.P.

    1983-01-01

    The problems of proce-sing NPP intermediate level- and low-level liquid radioactive wastes (LRW) are considered. Various methods are compared of LWR solidification on the base of bituminization, cement grouting and inclusion into synthetic resins. It is concluded that the considered methods ensure radioactive radionuclides effluents into open hydronetwork at the level below the sanitary, standards

  10. Biotic elements of NPP techno-ecosystem

    International Nuclear Information System (INIS)

    Protasov, A.A.; Silaeva, A.A.

    2013-01-01

    Specific features of biotic elements in the NPP techno-ecosystems were considered and compared with natural ecosystems. Relationships between biotic communities and environmental factors that are specific to the techno-ecosystems were discussed, and the problems of limitation of biological hindrances in operation of equipment, principles of hydrobiological and environmental monitoring were considered.

  11. Slovakia: Mochovce NPP. Project control. Annex 10

    International Nuclear Information System (INIS)

    Bodorik, K.

    1999-01-01

    This annex deals with project control. Mochovce NPP suffered considerable delay primarily due to lack of money. This situation was corrected and construction resumed in 1996. Throughout the 'dormant' period the plant received considerable support from the major contractors, who maintained skeleton staff at site. Significant safety and managerial improvements are being introduced and a strategic plan for the plant has been developed. (author)

  12. Development of NPP safety regulation in Russia

    International Nuclear Information System (INIS)

    Vishnevsky, Y.G.; Gutsalov, A.T.; Bukrinsky, A.M.; Gordon, B.G.

    1999-01-01

    The presentation describes the organisation scheme of Russian safety regulatory bodies, their tasks and responsibilities. Legislative and regulatory basis of NPP safety regulations rely on the federal laws: Law on the Use of Nuclear Energy and Law on Radiation Safety of the Population. Role of international cooperation and Improvement of regulatory activities in Russia are emphasised

  13. Sitting Safety Aspects of Second Romanian NPP

    International Nuclear Information System (INIS)

    Mauna, T.

    2010-01-01

    The first Romanian NPP CANDU 6 type reactor gone to erection in 1980 on Cernavoda site planned to have 5 units like the Wolsong applied design project for nuclear island. For the BOP parts the ASALDO-GE project was applied with the careful about the interface connection NSP requirements. The new NPP sitting studies began from 1982 in a serious manner as first part on Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. For develop the all package of the studies in concordance with the first IAEA Safety Standards recommendations. Till the 1982 the first mission of design and research multi-branch of specialists team was to adapt the NPP Cernavoda project having a open water cooling circuit to the new parameters of close water cooling circuit. But the team was looking at the other type of NPP for sitting. Also in the same time was studied the possibility of NSP foundation on hard less or soft soil foundation strata in connection with safety aspects. The close circuit of cooling water means others parameters of systems and need very large cooling towers. Also must be reconsidering the safety systems design and performance as new solution. In the south of Transylvania historical region in Romania the Olt River run from west to east having medium multi annual flow around 70 m3/s. The Olt River has a chain of small hydropower in operation and other planned. From geological and geophysical points of view two main faults, along the Olt river valley, one of this having seismically small activities was detected. Site region geotechnical studies show small quantity underground natural gas, salt and peat. The initial nuclear program has imposed 4 NPP units site near Olt River. Taking into account the orogenesis, water cooling needs and other local feature can't be built more than two NPP units on a site. This paper tries to reconsider the old analysis from the last IAEA Safety Standards point of view taking into account the new

  14. Considerations related to Cernavoda NPP lifetime management

    International Nuclear Information System (INIS)

    Cojan, Mihail

    2007-01-01

    Cernavoda NPP, the first CANDU in Europe, is one of the original CANDU 6 plants and the first CANDU 6 producing over 706 MWe. While the first series of CANDU 6 plants (which entered service in the early 1980 s) have now reached the 2/3 of their 30 years design life, the Cernavoda NPP was put into service on the 2nd December 1996. After 10 years of operation the Plant Life Management (PLiM) Program for Cernavoda should be an increasingly important program to Utility ('CNE - Prod') in order to protect the investment and the continued success of plant operation. The goal of the paper is to present some considerations related to Cernavoda NPP lifetime management. The Plant Life Management Program, known as PLiM Program is concerned with the analysis of technical limits of the safe operation - from the point of view of nuclear safety - in NPP units, aiming at attaining the planned 30 years life duration and its extension to 40 or even 50 years of safe and economical operation. For the CANDU reactors the so-called PLiM and PLEX Programs are just applied. These are applied research programs that approach with priority the current practices for assessing the capability of safe operation within the limits of nuclear safety (fitness-for-service assessment). These programs also approach inspection, monitoring are prevention of degrading due to the ageing of critical systems, structures and components (CSSCs). As each nuclear plant is somewhat different in its components and systems, materials composition, procurement, construction, and operational history, directed research and development programs into materials behavior, monitoring techniques, and methods to mitigate ageing are required to support the lifetime management. Over the past 6 years, INR Pitesti (Institute for Nuclear Research - Romania) has been working on R and D Programs to support a comprehensive and integrated Cernavoda NPP Life Management Program (PLiM) that will see the Cernavoda NPP successfully and

  15. Cernavoda NPP simulator - next generation

    International Nuclear Information System (INIS)

    Tatar, F.; Ionescu, T.; Dascalu, M.

    2003-01-01

    Demand for extending the amount of training and scope for Cernavoda Unit 1 as well as the new trend in the simulator owners world, led to a change in the Romanian philosophy of simulator specification. Up to now the training was conducted on a Full Scope simulator, a 1:1 replica of Cernavoda Unit 1 reference plant. The present task is to define the simulation facilities and structure capable to meet the requirements for training, qualification and licensing of personnel for both Cernavoda Unit 1 and Unit 2. Obviously, the Cernavoda Unit 2 belongs to the same technological family but has rather different control room layout. Since this target requires a new simulator the costs would be rather high in accordance to the degree of automation of Cernavoda NPP. Therefore, depending on training requirements and financing, the Cernavoda Unit 1 simulator modernization, which also provides an alternative to full scope control room simulator, may be a viable option. Therefore the solution that with discuss for Cernavoda training extension is the migration of Cernavoda Unit 1 simulator to state-of-the-art. Consequently, the Cernavoda Unit 1 simulator modernization task will be organized as project including the following major items: 1. Rehost existing U1 simulation software from VAX 4500 to: - Best commercial multi-processor server for simulation server (HP, O/S Linux); - Best commercial single processor PC for I/O communications (HP, O/S Linux); 2. Replace DCC with enhanced emulated version: Best commercial individual PC for DCC emulation (HP, O/S Windows); Support for actual keyboards; Replacement of RAMTEK System and CONRAC Monitors with X terminals or PC's; 3. Conversion of AutoCAD-based panel graphic pages to RAVE-based; 4. Install the required software tools for developing enhanced simulation modules; 5. Replace the simulation modules with advanced modules; 6. Replace the present Windows Instructor Facilities with ISIS; 7. Development of a selection of MCR-U1 virtual

  16. Revision of Krsko NPP Quality Assurance Plan

    International Nuclear Information System (INIS)

    Biscan, R.; Fifnja, I.; Kavsek, D.

    2012-01-01

    International standards from nuclear power plant operation area are being frequently upgraded and revised in accordance with the continuous improvement philosophy. This philosophy applies also to the area of Quality Assurance, which has also undergone significant improvement since the early 1950s. Besides just nuclear industry, there are also other international quality standards that are being continuously developed and revised, bringing needs for upgrades also in the nuclear application. Since the beginning of Krsko NPP construction, the overall Quality Assurance program and its applicable procedures were in place to assure that all planned and systematic actions necessary to provide adequate confidence that an item or service will satisfy given requirements to quality, are in place. The overall requirements for quality as one of the major objectives for Krsko NPP operation are also set forth in the Updated Safety Analyses Report, the document that serves as a base for operating license. During more than 30 years of Krsko NPP operation, the quality requirements and related documents were revised and upgraded in several attempts. The latest revision 6 of QD-1, Quality Assurance Plan was issued during the year 2011. The bases for the revision were: Changes of the Slovenian regulatory requirements (ZVISJV, JV5, JV9?), Changes of Krsko NPP licensing documents (USAR section 13?), SNSA inspection requirements, Changes of international standards (IAEA, ISO?), Conclusions of first PSR, Implementation of ISO standards in Krsko NPP (ISO14001, ISO17025), Changes of plant procedures, etc. One of the most obvious changes was the enlargement of the QA Plan scope to cover interdisciplinary areas defined in the plant management program MD-1, such as Safety culture, Self-assessment, Human performance, Industrial Safety etc. The attachment of the QA Plan defining relationships between certain standards was also updated to provide matrix for better correlation of requirements of

  17. Modernization of the oldest Swedish NPP

    International Nuclear Information System (INIS)

    Hagberth, Ronald

    1998-01-01

    OKG operates three BWR units of ABB design: Oskarshamn 1 with a net capacity of 440' MW, Oskarshamn 2 of 600 MW and Oskarshamn 3 of 1160 MW. Oskarshamn 1 NPP was commissioned in 1972 as the first commercial nuclear unit in Sweden. After more than twenty years of successful operation, the unit is now also the first reactor in Sweden to undergo a large safety modernization program. In the year 2000 the Oskarshamn 1 NPP will be modernized to a high level of safety standard and ready for operation for another period of at least 20 years. Experience gained can be used when modernizing other NPPs. The investment program for life extension is reasonable and shows that NPPs can be operated with an expected life span of more than 40 years at an ever-increasing safety level and still be very competitive in a deregulated market. (author)

  18. Intelligent system for accident identification in NPP

    International Nuclear Information System (INIS)

    Hernandez, J.L.

    1998-01-01

    Accidental situations in NPP are great concern for operators, the facility, regulatory bodies and the environmental. This work proposes a design of intelligent system aimed to assist the operator in the process of decision making initiator events with higher relative contribution to the reactor core damage occur. The intelligent System uses the results of the pre-operational Probabilistic safety Assessment and the Thermal hydraulic Safety Analysis of the NPP Juragua as source for building its knowledge base. The nucleus of the system is presented as a design of an intelligent hybrid from the combination of the artificial intelligence techniques fuzzy logic and artificial neural networks. The system works with variables from the process of the first circuit, second circuit and the containment and it is presented as a model for the integration of safety analyses in the process of decision making by the operator when tackling with accidental situations

  19. Quality of Industry Support to NPP Krsko

    International Nuclear Information System (INIS)

    Nemcic, K.

    2008-01-01

    NPP Krsko developed program for Supplier evaluation and performance. During the regular control of suppliers and evaluation of industry support to NPP Krsko quality problems were reported. Different quality systems were evaluated and different suppliers as: design organizations, equipment manufacturers, material vendors were audited or surveillance was performed. This paper discuss and report various cases where quality issues were problems based on audit results and present actions and efforts undertaken by the NE Krsko Quality Assurance Department to improve performance of the contractors, vendors, suppliers. New and different quality standards as approach in numerous articles are described as improvement or quality changes but also 'different opinion exist'. This paper also presents the author view and approach how to solve the possible future problems with different quality systems and organisations used by industry who support daily operation of NE Krsko and give recommendations for future nuclear projects.(author)

  20. SAT for NPP personnel training in USA

    International Nuclear Information System (INIS)

    Spinney, R.

    1995-01-01

    This discussion addressed the experience with the application of SAT at USA NPPs. In particular, the transition of NPP training processes, staff composition, and reporting structure from the TMI accident to present. As well, oversight and guidance activities of the INPO and more intensive inspection by the NRC began during this period. The average NPP training staff grew to 30-40 per unit, along with a change in reporting line from plant to corporate management. With the reduction of resources occurring in the late 1980s, overall training staff size decreased, the composition changed, and reporting line reverted to plant management. The overall lessons-learned for application of the SAT consisted of the need for simplification, management involvement, and exploitation of the technology

  1. LTO License Application Project NPP Borssele

    International Nuclear Information System (INIS)

    Jong, A.E. de; Blom, F.J.; Leilich, J.

    2012-01-01

    Borssele NPP plans to extend its operating life with 20 years until 2034. Borssele has started the project LTO 'bewijsvoering' (LTO 'Justification') in order to meet the requirements of the Dutch regulator. The outline of the project is based on IAEA safety guide 57 'Safe Long Term Operation of Nuclear Power Plants'. This paper describes the contents and coherence of the different parts in the project and how these respond to the IAEA guidelines on LTO. The goal of the project LTO 'bewijsvoering' is to ensure that safety and safety relevant systems, structures and components continue to perform their intended functions during long term operation. The outcome of the project LTO 'bewijsvoering' will be used for a license change application and this will be submitted to the Dutch regulator KFD for approval of prolonged operation of Borssele NPP after 2013. (author)

  2. NPP Temelin. Status of safety improvements

    International Nuclear Information System (INIS)

    1999-01-01

    The WWER-1000 Temelin NPP under construction has been subjected as other NPPs of the same type to numerous project reviews resulting in quite a number of recommendations for design changes. Results of the IAEA mission to review the resolution of WWER-1000 safety issues at Temelin NPP are cited in this paper. The main conclusions emphasize that a combination of eastern and western technology and practices led to safety improvements in comparison with the international practices. Plant managers are clearly committed to implementation of operational programs which are consistent with effective western operational safety practices. Considerable effort remains to bring planned programs to successful implementation, in particular in meeting the need to foster strong safety culture among all personnel

  3. Organizational aspects of NPP operator training

    International Nuclear Information System (INIS)

    Vel'chinskij, V.I.

    1992-01-01

    The main points of the document regulating the selection, prepation, permission for work and in-service control of NPP personnel developed on the basis of the IAEA requirements are considered. The specialists engaged for work are subjected to qualification, medical, professional, psychological and psychophysiological selections. The scheduled monthly instructive lessons are conducted during the work. The antiaccident and fire-fighting trainings are organized not rarely than twice in three months

  4. Current status of NPP generation IV

    International Nuclear Information System (INIS)

    Yohanes Dwi Anggoro; Dharu Dewi; Nurlaila; Arief Tris Yuliyanto

    2013-01-01

    Today development of nuclear technology has reached the stage of research and development of Generation IV nuclear power plants (advanced reactor systems) which is an innovative development from the previous generation of nuclear power plants. There are six types of power generation IV reactors, namely: Very High Temperature Reactor (VHTR), Sodium-cooled Fast Reactor (SFR), Gas-cooled Fast Reactor (GFR), Lead-cooled Fast Reactor (LFR), Molten Salt Reactor (MSR), and Super Critical Water-cooled Reactor (SCWR). The purpose of this study is to know the development of Generation IV nuclear power plants that have been done by the thirteen countries that are members of the Gen IV International Forum (GIF). The method used is review study and refers to various studies related to the current status of research and development of generation IV nuclear power. The result of this study showed that the systems and technology on Generation IV nuclear power plants offer significant advances in sustainability, safety and reliability, economics, and proliferation resistance and physical protection. In addition, based on the research and development experience is estimated that: SFR can be used optimally in 2015, VHTR in 2020, while NPP types GFR, LFR, MSR, and SCWR in 2025. Utilization of NPP generation IV said to be optimal if fulfill the goal of NPP generation IV, such as: capable to generate energy sustainability and promote long-term availability of nuclear fuel, minimize nuclear waste and reduce the long term stewardship burden, has an advantage in the field of safety and reliability compared to the previous generation of NPP and VHTR technology have a good prospects in Indonesia. (author)

  5. AGNES - safety reassessment of Paks NPP

    International Nuclear Information System (INIS)

    Gado, J.

    1995-01-01

    The main goal of the AGNES (Advanced General and New Evaluation of Safety) project for the reassessment of the safety of Paks Nuclear Power Plant, Hungary, was to improve the safety culture of the technology at Paks. A report was prepared on the reassessment of the Paks NPP safety. The analysis was divided into four groups: systems analysis, analysis of design basis accidents, severe accident analysis, and level 1 probabilistic safety analysis. Proposed safety enhancement measures are discussed. (N.T.)

  6. Design safety improvements of Kozloduy NPP

    International Nuclear Information System (INIS)

    Hinovski, I.

    1999-01-01

    Design safety improvements of Kozloduy NPP, discussed in detail, are concerned with: primary circuit integrity; reactor pressure vessel integrity; primary coolant piping integrity; primary coolant overpressure protection; leak before break status; design basis accidents and transients; severe accident analysis; improvements of safety and support systems; containment/confinement leak tightness and strength; seismic safety improvements; WWER-1000 control rod insertion; upgrading and modernization of Units 5 and 6; Year 2000 problem

  7. Aspects of accident management in Cernavoda NPP

    International Nuclear Information System (INIS)

    Dascalu, N.

    1999-01-01

    As a general conclusion, the accident management system as implemented at Cerna voda NPP is expected to be appropriate for handling a severe accident, should it occur, in such a way that the environmental radiological consequences would be insignificant and radiation exposure of the personnel be within recommendations. It is recognized, however, that continued development and verification of the system as well as effective personnel training programs are essential to maintain the safety level achieved. (author)

  8. On some methods of NPP functional diagnostics

    International Nuclear Information System (INIS)

    Babkin, N.A.

    1988-01-01

    Methods for NPP functional diagnosis, in which space and time dependences for controlled variable anomalous deviations change are used as characteristic features, are suggested. The methods are oriented for operative recognition of suddenly appearing defects and envelop quite a wide range of possible anomalous effects in an onject under diagnostics. Analysis of transients dynamic properties caused by a failure is realized according to the rules, which do not depend on the character of anomalous situation development

  9. Supercompaction of radioactive waste at NPP Krsko

    International Nuclear Information System (INIS)

    Fink, K.; Sirola, P.

    1996-01-01

    The problem of radioactive waste management is both scientifically and technically complex and also deeply emotional issue. In the last twenty years the first two aspects have been mostly resolved up to the point of safe implementation. In the Republic of Slovenia, certain fundamentalist approaches in politics and the use of radioactive waste problem as a political tool, brought the final radioactive repository siting effort to a stop. Although small amounts of radioactive waste are produced in research institutes, hospitals and industry, major source of radioactive waste in Slovenia is the Nuclear Power Plant Krsko. When Krsko NPP was originally built, plans were made to construct a permanent radioactive waste disposal facility. This facility was supposed to be available to receive waste from the plant long before the on site storage facility was full. However, the permanent disposal facility is not yet available, and it became necessary to retain the wastes produced at the plant in the on-site storage facility for an extended period of time. Temporary radioactive storage capacity at the plant site has limited capacity and having no other options available NPP Krsko is undertaking major efforts to reduce waste volume generated to allow normal operation. This article describes the Radioactive Waste Compaction Campaign performed from November, 1994 through November, 1995 at Krsko NPP, to enhance the efficiency and safety of storage of radioactive waste. The campaign involved the retrieval, segmented gamma-spectrum measurement, dose rate measurement, compaction, re-packaging, and systematic storage of radioactive wastes which had been stored in the NPP radioactive waste storage building since plant commissioning. (author)

  10. Using bentonite for NPP liquid waste treatment

    International Nuclear Information System (INIS)

    Bui Dang Hanh

    2015-01-01

    During operation, nuclear power plants (NPPs) release a large quantity of water waste containing radionuclides required treatment for protection of the radiation workers and the environment. This paper introduces processes used to treat water waste from Paks NPP in Hungary and it also presents the results of a study on the use of Vietnamese bentonite to remove radioactive Caesium from a simulated water waste containing Cs. (author)

  11. Perspectives of Living PSA in NPP Krsko

    International Nuclear Information System (INIS)

    Vrbanic, I.; Kastelan, M.

    1996-01-01

    Nuclear power plant Krsko has completed the Level 1/Level 2 Probabilistic Safety Analysis (PSA) for internal initiating events and is in the process of completing the same for the external initiators. The analysis completed up to now has provided a valuable insight into a plant risk profile. In NPP Krsko there is a plan to use the PSA model as a permanent tool for the risk based applications and incorporate it into a decision making process. In order to achieve this there is a need to permanently maintain the PSA model in a manner that it reflects both the plan configuration/design at a time point and the operational experience up to the time point. All the activities aimed toward keeping the PSA model up-to-dated in this sense are usually referred to as a Living PSA (LPSA) program. NPP Krsko is in the process of defining and proceduralizing a LPSA program that would be plant specific and based on known world practices. Further, in order to be suitable for risk based applications the PSA model must be flexible in a sense that modifications to the base case model may be done easily and requantifications performed quickly as to evaluate various conditions imposed by real or hypothetical situations. NPP Krsko PSA model has been based on licensing type software. The requirements specified above dictate the transfer of the overall model to an application oriented software of newer generation with larger capabilities. The transfer becomes a part of a mentioned ongoing effort aimed at establishing LPSA model and concept. The paper present this effort and the perspectives of LPSA concept and risk based applications in NPP Krsko. (author)

  12. Simulation of reinforced concrete NPP structures

    International Nuclear Information System (INIS)

    Zverev, A.B.; Yaskevich, E.E.; Tarannikov, V.N.; Loginov, A.Ya.; Lagutov, V.I.

    1989-01-01

    Analysis of stress-strained state of NPP frame structures at different stages of their operation using the method of physical simulation, is conducted. Comparison of model investigations to the data of full-scale deformation measurement allows one to define the strength resource of the structures under operation. Bench test layout and results of investigations into strength, deformation, thermal-physical and acoustic emission parameters of the investigated processes during model loading, are presented

  13. Replacement of the computerized control system at NPP under operation

    International Nuclear Information System (INIS)

    Ermolaev, A.D.; Rakitin, I.D.

    1985-01-01

    Reasons and preconditions for replacement of the computerized control systems (CCS) at NPP under operation are consi-- dered. Problems dealing with management of CCS replacement, maintenance of a new CCS as well as NPP personnel training for the new system maintenance are discussed. A necessity of NPP personnel participation in these works in order to adapt CCS to requirements of NPP operation personnel and to initiate the training process is underlined. Replacement of CCS at NPP under operation is associated, as a rule, with obsolescence of old systems not ensuring growing requirements to NPP workability and safety. Principles observed at CCS replacement are reduced, mainly, to the following; maximum utilizatian of existing equipment, metal strUctures, cables, instruments, power supplies, ventilation system minimum of construction works and new communications; the least change of acting panels and boxes; changes in control desks should be introduced on the basis of the analysis of operator actions '

  14. Ageing management database development for PWR NPP steam generator

    International Nuclear Information System (INIS)

    Liu Hongyun; Xu Liangjun; Xiong Changhuai; Wang Xianyuan

    2005-01-01

    Steam generator (SG) is one of the key safe important equipment of NPP, which is covered by NPP aging management program. Steam Generator Aging Management Dabatase (SGAMDB) is developed to provide necessary information for SG aging management. RINPO is developing SGAMDB for domestic NPP. This system contains information and data about SG design, manufacture, operation and maintenance. The information include NPP fundamental data, SG design data, SG aging mechanism, SG operation data, SG ISI data, SG maintenance data and SG evaluation interface. The system runs at the intranet of Qinshan-1 NPP with B/S mode. It can provide information inquire and fundamental analysis for NPP SG aging team and SG aging researcher's. In addition, it provides necessary information and data for SG aging analysis and evaluation, such as all pressure test process and flaws of tubes, and collects the analysis results. (authors)

  15. Fuel leak testing performance at NPP Jaslovske Bohunice

    International Nuclear Information System (INIS)

    Slugen, V.; Krnac, S.; Smiesko, I.

    1995-01-01

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR's. 1 tab., 2 figs., 3 refs

  16. Fuel leak testing performance at NPP Jaslovske Bohunice

    Energy Technology Data Exchange (ETDEWEB)

    Slugen, V; Krnac, S [Slovak Technical Univ., Bratislava (Slovakia); Smiesko, I [Nuclear Powr Plant EBO, Jaslovske Bohuce (Slovakia)

    1996-12-31

    The NPP Bohunice VVER-440 fuel leak testing experience are relatively extensive in comparison with other VVER-440 users. As the first Europe NPP was adapted Siemens (KWU) in core-sipping equipment to VVER-440 units and since this time were have done these tests also for NPP Paks (Hungary) and NPP Dukovany (Czech Republic). The occurrence of leaking fuel assemblies in NPP is in the last 5 years relatively stabilised and low. A significant difference can be observed between type V-230 (31 leaks) and type V-213 (1 leak). None of of the indicated leaking fuel assemblies has been investigated in the hot cell. Therefore cannot be confirm the effective causes of leak occurrence. Nevertheless, the fuel failure rate and the performance of leak testing in NPP Bohunice are comparable to the world standard at PWR`s. 1 tab., 2 figs., 3 refs.

  17. Financial and organizational models of NPP construction projects

    International Nuclear Information System (INIS)

    Ivanov, Timur

    2010-01-01

    The recent evolution of financial and organizational models of NPP projects can be truly reputed to open a new page of the world market of NPP construction. The definition of the concrete model is based mostly on specific cooperation backgrounds and current terms and conditions under which the particular NPP project is being evolved. In this article the most commonly known strategies and schemes of financing structuring for export NPP construction projects are scrutinized. Special attention is paid to the analysis of BOO/BOT models which are based on the public-private partnership. Most BOO/BOT projects in the power sector has Power Purchase Agreements (PPA) as an integral part of them. The PPA key principles are studied here as well. The flexibility and adaptability of the public-private partnership models for financing and organization of the NPP projects contributes substantially to the competitiveness of the NPP projects especially under current economic conditions. (orig.)

  18. About choosing the power unit of NPP

    International Nuclear Information System (INIS)

    Alekseev, P.N.; Mordashev, V.M.; Proshkin, A.A.; Stukalov, V.A.; Subbotin, S.A.; Tsibul'skij, V.F.; Chernilin, Yu.F.

    2008-01-01

    The present-day domestic nuclear power industry faces the necessity to make both process and economy related decisions. The mentioned decisions should cover all the aspects of the nuclear power complex. In particular, as of now, no substantiation of the present-day and the future requirements for the power unit of the WWER and fast reactor NPPs is available. The choice of the unit power of an NPP should involve consideration of all factors and should not be boiled down to the efforts to ensure the minimization of the investment and the operation constituents of the electric power generation costs. The aim of the present paper was to ensure elaboration of the recommendations to substantiate the optimal unit power of NPP power units based on the analysis of various factors to design, to construct and to operate an NPP (investment, time of construction, the unscheduled shutdown losses, the unification, the fabrication quality, the accident damage, etc.), and the electrical network potentialities and the regional electric power demands [ru

  19. Safety parameter display system for Kalinin NPP

    International Nuclear Information System (INIS)

    Andreev, V.I.; Videneev, E.N.; Tissot, J.C.; Joonekindt, D.; Davidenko, N.N.; Shaftan, G.I.; Dounaev, V.G.; Neboyan, V.T.

    1995-01-01

    The paper discusses the safety parameter display system (SPDS), which is being designed for Kalinin NPP. The assessment of the safety status of the plant is done by the continuous monitoring of six critical safety functions and the corresponding status trees. Besides, a number of additional functions are realized within the scope of KlnNPP, aimed at providing the operator and the safety engineer in the main control room with more detailed information in accidental situation as well as during the normal operation. In particular, these functions are: archiving, data logs and alarm handling, safety actions monitoring, mnemonic diagrams indicating the state of main technological equipment and basic plant parameters, reference data, etc. As compared with the traditional scope of functions of this kind of systems, the functionality of KlnNPP SPDS is significantly expanded due to the inclusion in it the operator support function ''computerized procedures''. The basic SPDS implementation platform is ADACS of SEMA GROUP design. The system architecture includes two workstations in the main control room: one is for reactor operator and the other one for safety engineer. Every station has two CRT screens which ensures computerized procedures implementation and provides for extra services for the operator. Also, the information from the SPDS is transmitted to the local crisis center and to the crisis center of the State utility organization concern ''Rosenergoatom''. (author). 3 refs, 6 figs, 1 tab

  20. The NPP Isar comprehensive Aging Management Program

    International Nuclear Information System (INIS)

    Zander, Andre; Ertl, Stefan

    2012-01-01

    The majority of System, Structure and Components (SSC) in a nuclear power plants are designed to experience a service life, which is far above the intended design life. In most cases, only a small percentage of SSCs are subject to significant aging effects, which may affect the integrity or the function of the component. The process of aging management (AM) has the objective to monitor and control degradation effects which may compromise safety functions of the plant. And furthermore, to ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects. Safety-related aspects and the targeted high availability of the power plant as well as the requirements stipulated by German regulatory authorities prompted the operator of NPP ISAR to introduce an aging surveillance program. The NPP Isar as well as the German NPPs has to be following in the scope of aging management the KTA 1403 guideline. The NPP Isar surveillance program based on the KTA 1403 guideline covers the following aspects: - Scoping and screening of safety relevant Systems, Structures and Components (SSC); - Identification of possible degradation mechanisms for safety relevant SSC; - Ensure, that testing and maintenance programs sufficiently provide preventive measures to control degradation effects; - Transferability check of industry experience (internal and external events); - Annual preparation of an AM status report. (author)

  1. Tritium liquid effluents from the Krsko NPP

    International Nuclear Information System (INIS)

    Savli, S.; Krizman, M.; Nemec, T.; Cindro, M.; Stritar, A.; Vokal Nemec, B.; Janzekovic, H.

    2007-01-01

    In the past, 12-months' fuel cycles in the Krsko NPP had not caused any problems regarding compliance with its Technical Specifications and license limits on liquid tritium releases (20 TBq/year, 8 TBq/three months). The first 18-months' fuel cycle, which was introduced in 2004, required fuel with higher enrichment, higher boron concentration in the primary coolant and more fuel rods with burnable poisons. In 2005, the NPP operated without refueling outage for the whole year and produced the highest amount of energy so far. Due to these facts and a few unplanned shutdowns and power reductions, production of tritium and releases increased strongly in 2005. As a result, the Krsko NPP hardly succeeded to stay within regulatory limits on tritium releases. However, the three-months' limit was exceeded in the first quarter of 2006. On the basis of conclusions acquired from the SNSA's study and practice of other European countries the SNSA considerably increased the annual limit of permitted liquid tritium releases (from 20 TBq to 45 TBq) and abolished the three-months' limit. At the same time, the SNSA reduced the limit of fission and activation products by halves. (author)

  2. Optimization of radiation protection at Bohunice NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Svitek, J.

    2003-01-01

    Bohunice Nuclear Power Plant is situated in south - western part of Slovakia about 50 km away from Bratislava. There are four PWR reactors 440 MW e each - two units with reactors WWER - 230 (V1 NPP) and two units with WWER - 213 (V2 NPP). requirements for the optimization process are given in the mentioned Code No.12 of Ministry of Health. Code 12 stipulates the technical and organizational requirements for proving the Rational Achievable Level (RAL) of radiation protection. This level can be proved by means of the comparison of the dose distribution to the costs of protection. An example of two figures of dose constraints is: collective dose 20 man mSv for the specific task; individual exposure 1 mSv per day. The values of the financial equivalents of personal exposure - so called the alpha coefficients - are used for the calculation of the benefit of proposed measures. Impact of legislative changes into Bohunice NPP and optimization process are presented. Apparently the new law and the associate code created a base of transparent and understandable policy of radiation protection and optimization in Slovak Republic. The radiation protection legislative was implemented into the praxis and persons became familiar with it. Defining clear and unambiguous terms facilitated the communication between users and the regulatory body - State Health Institute. Optimization was generally accepted by the workers and managers and began to be a part of safety culture of operation at nuclear power plants. (authors)

  3. Knowledge management in the NPP domain

    International Nuclear Information System (INIS)

    Nilsen, Svein; Bisio, Rossella; Ludvigsen, Jan Tore

    2004-03-01

    This report gives an outlook on Knowledge Management (KM) activities within NPP related establishments as of today. There may be less activity in the NPP world as compared to many other industrial sectors. Still there is an awakening within the NPP industry demanding that KM should be attended to at a larger scale. The most notable reason for this is maybe an imminent increase in the number of people going into retirement. The types of establishments involved cover the major kinds such as utilities, research institutes and worldwide nuclear organizations. The report sums up a few of those efforts that are presently being implemented. Moreover the report looks at general advancements within the field of knowledge management. Simply stated the endeavours belong to either one of two classes. The first class emphasize the use of technology to solve knowledge management problems. The second class regard knowledge management as a problem pertaining to human factors and organizational issues. This report maintain that knowledge management initiatives should make due considerations to both perspectives. This report also sums up the Halden Reactor Project short term KM initiative. (Author)

  4. On psichological problem of NPP operation and control

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1994-01-01

    The role of psichological factor as a reserve for increasing NPP safety connected with human factor is discussed. It is emphasized that the process of NPP personnel professional training should not be restricted by formation of a certain set of knowledge, skills and experience. It is necessary to initiate ability for constant self-developing. Control for assurance of effective interaction of the whole NPP personnel is an important problem

  5. Safety Culture Survey in Krsko NPP

    International Nuclear Information System (INIS)

    Strucic, M.; Bilic Zadric, T.

    2008-01-01

    The high level of nuclear safety, stability and competitiveness of electricity production, and public acceptability are the main objectives of Krsko Nuclear Power Plant. This is achievable only in environment where strong Safety Culture is taking dominant place in the way how employees communicate, perform tasks, share their ideas and attitudes, and demonstrate their concern in all aspects of work and coexistence. To achieve these objectives, behaviour of all employees as well as specific ethical values must become more transparent and that must arise from the heart of organization. Continuous ongoing and periodic self assessments of Safety Culture in Krsko NPP present major tools in implementation process of this approach. Benefits from Periodic interdisciplinary focused self assessment approach, which main intention is finding the strengths and potential areas for improvements, was used second time to assess the area of Safety Culture in Krsko NPP. Main objectives of self assessment, performed in 2006, were to increase the awareness of the present culture, to serve as a basis for improvement and to keep track of the effects of change or improvement over a longer period of time. For the purpose of effective self assessment, extensive questionnaire was used to obtain information that is representative for whole organization. Wide range of questions was chosen to cover five major characteristics of safety culture: Accountability for safety is clear, Safety is integrated into all activities, Safety culture is learning-driven, Leadership for safety is clear and Safety is a clearly recognized value. 484 Krsko NPP employees and 96 contractors were participated in survey. 70-question survey provided information that was quantified and results compared between groups. Anonymity of participant, as well as their willingness to contribute in this assessment implicates the high level of their openness in answering the questions. High number of participant made analysis of

  6. Main principles of NPP project ecological expert investigation

    International Nuclear Information System (INIS)

    Dibobes, I.K.; Revina, S.K.; Glushkov, V.P.

    1983-01-01

    NPP project ecological expert investigation among the other objectives is to provide implementation of standards, rules and requirements as well as government decrees and international obligations of the USSR concerning the environment protection. The expert investigation takes into consideration both environment protection, regional, resources, ecological, demographic and economic aspects. The NPP siting and the local environment and resources state are estimated as well as the structure of utilization of the latter, the expected damage to the environment due to NPP construction and the measures directed towards the optimal using of natural resources. On the basis of the presented issues suggestions about NPP projects coordination with Goskomgidromet's institutions are given [ru

  7. Dissemination of Knowledge about NPP Instrumentation and Control Systems

    International Nuclear Information System (INIS)

    Yastrebenetsky, M.

    2016-01-01

    Full text: Instrumentation and control (I&C) systems are the most variable part in the nuclear power plants (NPP) comparatively with any other NPP systems. This statement is connected with the wide use of computers, rapid changes in information technologies, with the appearance of new computer complex electronic components, e.g., field programmable gate arrays (FPGA) and with appropriate point of their insertion into NPP I&C life cycle. The changes in NPP I&C systems require the dissemination of the knowledge about these systems. Lessons after Fukushima accident increase necessity of these actions. The elaboration and following dissemination of this knowledge took place in different directions: • Writing and issue of three new books about NPP I&C systems for specialists and for students which were issued in Ukrainian and USA public houses (the last book was issued in 2014); • Organization of five international scientific technical conferences, devoted to NPP I&C safety problems; • Elaboration of national (Ukrainian) standards and regulations pertaining to safety important NPP I&C systems (the last standard was issued in 2015) and participation in elaboration of international standards; • Lecturing for university students, NPP specialists and I&C designers. These actions in all directions are added to IAEA activity in the area NPP I&C systems (e.g., IAEA NP-T-3.12 “Core Knowledge on I&C systems in NPP”). (author

  8. Leningrad NPP and energetics of north-western Russia

    International Nuclear Information System (INIS)

    Belov, I.

    2000-01-01

    Problems of Leningrad NPP operating units modernization, their design service life finishing by year of 2010, are discussed. To assure safe operation of unit 1 investments in the amount of 30 mln. dol are necessary. Estimations suggest economic efficiency of the measures, permitting saving of 300 mln. dol worth of gas. Unfortunately, without a rise in tariff for electric power produced by NPP it seems impossible. It is recommended that substantiated tariffs are set for electric power produced by NPP starting from January, 2000. The measure is indispensable for raising investment funds intended for operating NPP modernization [ru

  9. Probabilistic assessment of NPP safety under aircraft impact

    International Nuclear Information System (INIS)

    Birbraer, A.N.; Roleder, A.J.; Arhipov, S.B.

    1999-01-01

    Methodology of probabilistic assessment of NPP safety under aircraft impact is described below. The assessment is made taking into account not only the fact of aircraft fall onto the NPP building, but another casual parameters too, namely an aircraft class, velocity and mass, as well as point and angle of its impact with the building structure. This analysis can permit to justify the decrease of the required structure strength and dynamic loads on the NPP equipment. It can also be especially useful when assessing the safety of existing NPP. (author)

  10. Near Regional and Site Investigations of the Temelin NPP Site

    International Nuclear Information System (INIS)

    Prachar, Ivan; Vacek, Jiri; Heralecky, Pavel

    2011-01-01

    The Temelin NPP is worldwide through heated discussion with nuclear energetic opposition. In addition this discussion goes beyond a border of the Czech Republic. On the other side, results of several international supervisions shown that Temelin NPP is fully comparable with the safest nuclear power plants in the world regarding its technical design and safety functions. This presentation deals with the near regional and site investigations of the Temelin NPP Site. It must be noted that although the Temelin site is situated in the area with low seismicity, item of seismicity is a basic argument against Temelin NPP and therefore a detail seismic hazard assessment was performed

  11. Predisposal of Radioactive Waste from NPP 1000 MWe

    International Nuclear Information System (INIS)

    Suryantoro

    2007-01-01

    Predisposal of radioactive waste from NPP 1000 MW which was planned to be operated in 2016 has been conducted. In this study NPP applying PWR type was assumed. This assessment comprises all aspects of radioactive waste coming from NPP. One through cycle was chosen consequently no reprocessing step will be conducted. The assessment shows that technologically all radioactive waste treatment process rising from NPP operation has similarities to the existing radioactive waste process conducted by RWI which has lower scale of waste amount. (author)

  12. From the chronicle of training of Dukovany NPP staff

    International Nuclear Information System (INIS)

    2005-01-01

    The long way the Dukovany NPP had to go before the plant staff was fully qualified and skilled is described. First the training concept was prepared, then the necessary training facilities were set up, lecturers and instructors were hired and trained, training programmes and training materials were developed, and ultimately the first training course was launched in 1979. A training NPP was constructed and a full-scope simulator of the Dukovany NPP was set up. The current status of organization of NPP staff training by the CEZ utility is highlighted. (author)

  13. Training center of Rovenskaya NPP. The experience of creation

    International Nuclear Information System (INIS)

    Fedorov, O.M.; Aristov, B.N.

    1991-01-01

    Experience in creation of a teaching-training centre at the Rovno NPP, which uses means available at unified NPPs, at most is discussed. The centre hardware complex functions include the event filing and providing for user-friendly interface with NPP technical personnel under training. The system of personnel training at the Rovno NPP teaching-training centre gives an opportunity to analyze accidents and emergency conditions more completely and carefully. The taching analysis of failures and accidents by a NPP operators using the complex of the teaching-training centre hardware sufficiently improves knowledge of particular accidents

  14. Chernobyl NPP decommissioning efforts - Past, Present and Future. Decommissioning Efforts on Chernobyl NPP site - Past, Present

    International Nuclear Information System (INIS)

    Kuchinskiy, V.

    2017-01-01

    Two unique large-scale projects are underway at the moment within the Chernobyl - Exclusion zone - Shelter object transformation into ecologically safe system and the decommissioning of 3 Chernobyl NPP Units. As a result of beyond design accident in 1986 the entire territory of the industrial site and facilities located on it was heavily contaminated. Priority measures were carried out at the damaged Unit under very difficult conditions to reduce the accident consequences and works to ensure nuclear and radiation safety are continuous, and the Unit four in 1986 was transformed into the Shelter object. Currently, works at the Shelter object are in progress. Under assistance of the International Community new protective construction was built above the existing Shelter object - New Safe Confinement, which will ensure the SO Safety for the long term - within up to 100 years. The second major project is the simultaneous decommissioning of Chernobyl NPP Units 1, 2 and 3. Currently existing Chernobyl NPP decommissioning Strategy has been continuously improved starting from the Concept of 1992. Over the years the following was analyzed and taken into account: the results of numerous research and development works, international experience in decommissioning, IAEA recommendations, comments and suggestions from the governmental and regulatory bodies in the fields of nuclear energy use and radioactive waste management. In 2008 the final decommissioning strategy option for Chernobyl NPP was approved, that was deferred gradual dismantling (SAFSTOR). In accordance with this strategy, decommissioning will be carried out in 3 stages (Final Shutdown and Preservation, Safe Enclosure, Dismantling). The SAFSTOR strategy stipulates: -) the preservation of the reactor, the primary circuit and the reactor compartment equipment; -) the dismantling of the equipment external in relation to the reactor; -) the safe enclosure (under the supervision); -) the gradual dismantling of the primary

  15. Design of NPP of new generation being constructed at the Novovoronezh NPP site

    International Nuclear Information System (INIS)

    Afrov, A.; Berkovich, V.; Generalov, V.; Dragunov, Yu.; Krushelnitsky, V.

    1999-01-01

    The design of a new generation NPP is described, underscoring advances in physical attributes and passive safety systems based on experiences with earlier designs at operating NPPs. This paper elaborates on systems for handling and storing radioactive wastes, on refinements in containment measures and on experimental and analytic validation of critical design factors. (author)

  16. Jpss System Architecture Npp to the Future

    Science.gov (United States)

    Furgerson, J.; Trumbower, G.

    2012-12-01

    The National Oceanic and Atmospheric Administration (NOAA) is acquiring the next-generation weather and environmental satellite system, named the Joint Polar Satellite System (JPSS). The National Aeronautics and Space Administration (NASA) serves as the acquisition and development agent. JPSS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA in the 1330 local time of ascending node (LTAN) orbit. The Suomi National Polar-orbiting Partnership (NPP) was launched into the 1330 LTAN orbit on October 28, 2011, and carries advanced sensors which will be featured on JPSS. It serves as a bridge mission and provides continuity for the NASA Earth Observation System and the POES. JPSS-1 is scheduled to launch in 2017. The Defense Meteorological Satellite Program (DMSP) managed by the DoD is operating in the 1730 LTAN orbit. The DoD is developing the Defense Weather Satellite Follow-on (WSF) system which will continue in the 1730 orbit. NASA is developing the Common Ground System (CGS) with the capability to process data from both the JPSS and WSF constellations. The CGS will be operated by NOAA. This poster will provide a top level status update of the program, as well as an overview of the JPSS system architecture. The space segment carries a suite of sensors that collect meteorological, oceanographic, and climatological observations of the earth and atmosphere. The system design allows centralized mission management and delivers high quality environmental products to military, civil and scientific users through a Command, Control, and Communication Segment (C3S). The data processing for NPP/JPSS is accomplished through an Interface Data Processing Segment (IDPS)/Field Terminal Segment (FTS) that processes NPP/JPSS satellite data to provide environmental data products to NOAA and DoD processing centers as well as remote terminal users.

  17. Corporate portal system at PAKS NPP, Hungary

    International Nuclear Information System (INIS)

    2009-01-01

    The new Corporate Portal System (CPS) of Paks NPP was launched in November 2006. The portal is based on one of the latest technologies, Plumtree Enterprise WEB 5.0. The main purpose of the installation of the new technology was to serve the working culture change, to give a platform to access all information and applications including the integrated process model used at the NPP. The new technology also supports those goals which were defined in the organization development programme: e.g. to improve internal communication with the establishment of communities of practice. Installation of the CPS has provided a powerful tool for knowledge management; it is possible to share and find all information through a controlled access in documents from various sources, to have links to people, portlets and different communities. Document management of the Paks NPP is supported by the integration of the Document 5 application, as the new Electronic Data Management System (EDMS) and the CPS. Depending on their access rights, all users of the CPS, through Microsoft Internet Explorer, can access technical, economic and human resources documents which are stored anywhere on the internal network (file servers, EDMS, old INRANET). The CPS is also accessible from the internet through a secure connection. The main concept is the integration of all applications to one platform and to help users to find all information they need. An access control list specifies which users and groups have access to an object (and what kind of access privileges they have such as read, select, edit, admin)

  18. Strategy for decommissioning of NPP's in Germany

    International Nuclear Information System (INIS)

    Rittscher, D.; Sterner, H.

    2003-01-01

    According to German Atomic Law, two different strategies are possible, i.e. direct dismantling and safe enclosure before dismantling. Both approaches have their advantages and disadvantages. Taking into account the site and plant specific conditions the optimal strategy can be evaluated. Both approaches have been applied in Germany in the past. The German Atomic Law and the Radiation Protection Ordinance (June 2002) were adapted recently (July 2002). Additionally, the life operation time of the German NPP's was fixed in a new law (April 2002): Orderly Termination of the Commercial Production of Nuclear Electricity. These issues have made it necessary for the power utilities to review the strategies applied. As long as the final disposal in Germany is still an open issue, the construction of local Interim Stores is necessary to be able to dismantle a NPP. The basic strategies are not excluding each other and it seems clear today, that the optimal approach is a combination of these strategies, e.g. dismantling of all auxiliary systems and leaving activated parts for a longer SE period. Within this approach the advantages of both basic strategies have been integrated in one. The EWN GmbH has developed such integrated but still different approaches for the decommissioning projects of the Kernkraftwerke Greifswald (KGR) and the Arbeitsgemeinschaft Versuchsreaktor (AVR) Juelich. It can be stated that the decommissioning of a NPP does not present technical issues of concern, but is more a project management issue, although surrounded by sometime intricate political and juridical boundary conditions. A major strategy change is to be expected only when final disposal capacities are available in the future. (authors)

  19. Contamination control by laundry monitor at NPP

    International Nuclear Information System (INIS)

    Singh, Vishwanath P.; Rana, P.K.; Lokeshwar Rao, S.; Managanvi, S.S.

    2010-01-01

    The operation of nuclear power reactor produces electricity as well as small quantity of radioactive waste as gaseous, liquid and solid. The waste contains radionuclides produced by fission and activation in reactor systems with wide spectrum of energy and half life. The long-lived nuclides Sr, Cs, Ba, Iodine and Co etc compared to short-lived are important in view of radiation protection. The radioactive contamination on the materials, human body or other places where it is undesirable is enormously harmful to workers at Nuclear Power Plant (NPP). The spread of radioactive from controlled areas is very complex problem for power reactor plant management

  20. Preparation of NPP Dukovany periodic safety review

    International Nuclear Information System (INIS)

    Dubsky, L.; Vymazal, P.

    2004-01-01

    Dukovany NPP in Czech Republic performs a periodic safety review for the second time after approximately 20 years of operation. The history of the Safety Report and its transformation into an internationally accepted form complying with IAEA standards is described. The deterministic and probabilistic assessment of the plant's safety-related design and state is applied to determine whether and to what extend the relevant protective goals are fulfilled by the existing plant design. A description of the step-by-step process is presented together with the creation of methods and criteria for PSR evaluation prepared by Nuclear Research Institute Rez

  1. Chernobyl NPP accident: a year later

    International Nuclear Information System (INIS)

    Asmolov, V.G.; Borovoj, A.A.; Demin, V.F.

    1988-01-01

    Consideration is being given to measures on liquidation of Chernobyl accident aftereffects, conducted since August, 1986. One of the most important measures lay in construction of the ''shelter'', which must provide long-term conservation of accidental unit. Works on decontamination of reactor area and contaminated populated regions were continued. Measures on providing safety of population and its health protection were performed. An attention was paid to long-term investigations on studying delayed aftereffects of the accident, monitoring of invironment, development and introduction of measures on improving NPP safety. Prospects of further development of nuclear power engeneering and possibilities of improving its safety are considered

  2. WWER-type NPP spray ponds screen

    International Nuclear Information System (INIS)

    Nikolova, M.; Jordanov, M.; Denev, J.; Markov, D.

    2003-01-01

    The objective of this study is to develop a protection screen of WWER-type NPP spray ponds. The screen design is to ensure reduction of the water droplets blown by the wind and, if possible, their return back to the spray ponds. The cooling capacity of the ponds is not to be changed below the design level for safety reasons. Computational fluid dynamics analysis is used to assess the influence of each design variant on the behavior of the water droplets distribution. Two variants are presented here. The one with plants is found not feasible. The second variant, with steel screen and terrain profile modification is selected for implementation. (author)

  3. The accidents during shutdown conditions Temelin NPP

    International Nuclear Information System (INIS)

    Sykora, M.; Mlady, O.

    1996-01-01

    Two parallel activities oriented for the accidents during shutdown conditions are performed at Temelin NPP: Development of symptom based emergency operating procedures (EOPs) applicable for the accidents which could occur during operational modes 1 through 4; independent evaluation of plant safety as part of the Temelin Shutdown probabilistic assessment to define the accidents which could occur during mode 5 and 6 for which the EOPs must be extended. Both these activities are in progress now because Temelin plant is still in the construction phase

  4. Experience in exchanging pipes in NPP containments

    International Nuclear Information System (INIS)

    Russell, D.J.

    1987-01-01

    Very careful planning and scheduling of NPP retrofit projects involving replacement of piping, valves, pumps and steam generators is essential. To meet the schedule, the approved design engineering documents must be prepared in good time. A viable electronic data processing program must be adopted to track progress and feedback on-site, and care must be exercised during the last phase of the project, i.e. in preparation of the documentation packages. In addition, there must be training of a sufficient number of skilled and responsible personnel, and all necessary job positions must be manned adequately, with close attention paid to health physics

  5. Safe 15 Terawatt of Temelin NPP

    International Nuclear Information System (INIS)

    Sula, M.

    2010-01-01

    In this work author presents a project Safe 15 Terawatt realised on the Temelin NPP. This project is one of the eight key projects of the CEZ group, associated in the 'Programme of efficiency'. The project started in June 2007 with long-term goals for horizon of year 2012. The safety indicators will be reached of the first quarter level of world's nuclear power plant - by the end of the first decade. By the end of year 2012 we will have achieved annual production of 15 billion kWh - in the Czech Republic: 15 Terawatt.

  6. Baltic NPP Project specifics and current status

    International Nuclear Information System (INIS)

    2011-01-01

    Project overview: 2 x 1194 MW Units (AES-2006 series); Location in Kaliningrad region of the; Russian Federation; Operation dates: Unit 1 – Oct 2016; Unit 2 – Apr 2018; Site preparatory works ongoing. This is first NPP project in the Russian Federation providing opportunity for participation of foreign investors. Foreign investors may acquire up to 49% share. Cross-border transmission lines developed under separate project with participation of foreign investors. Conclusion: At the selected set of assumptions, the project is financially feasible in all scenarios

  7. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Lipka, J.; Slugen, V.; Hascik, J.; Miglierini, M.

    2004-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. Surely more than 50% of high-educated technicians who work nowadays in nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as a one of seven faculties of this University feels responsibility for proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (Bc.), graduate (MSc.) and postgraduate (PhD.) study as well as via specialised training courses in a frame of continuous education system. (author)

  8. Core power capability verification for PWR NPP

    International Nuclear Information System (INIS)

    Xian Chunyu; Liu Changwen; Zhang Hong; Liang Wei

    2002-01-01

    The Principle and methodology of pressurized water reactor nuclear power plant core power capability verification for reload are introduced. The radial and axial power distributions of normal operation (category I or condition I) and abnormal operation (category II or condition II) are simulated by using neutronics calculation code. The linear power density margin and DNBR margin for both categories, which reflect core safety, are analyzed from the point view of reactor physics and T/H, and thus category I operating domain and category II protection set point are verified. Besides, the verification results of reference NPP are also given

  9. Mochovce NPP safety improvement and completion

    International Nuclear Information System (INIS)

    1997-01-01

    6th Nuclear society information meeting dealt with the completion of the Mochovce NPP with regard to implementation of safety measures. It was aimed to next problems: I. 'Survey' presentation on the situation of the nuclear power industry in partner countries; II. Basic technical presentations; III. Presentations of operators of the other VVER 440/213 NPPs on their activities in the field of safety improvement in relation to IAEA recommendations; IV. Technical solutions of safety improvements ranked with IAEA degree 3 (Report SC 108 VVER); V: Technical solutions of selected Safety Measures ranked with IAEA degree 2 and 1 (Report SC 108 VVER)

  10. Calculation of NPP pipeline seismic stability

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Ambriashvili, Yu.K.; Kaliberda, I.V.

    1982-01-01

    A simplified design procedure of seismic pipeline stability of NPP at WWER reactor is described. The simplified design procedure envisages during the selection and arrangement of pipeline saddle and hydraulic shock absorbers use of method of introduction of resilient mountings of very high rigidity into the calculated scheme of the pipeline and performance of calculations with step-by-step method. It is concluded that the application of the design procedure considered permits to determine strains due to seismic loads, to analyze stressed state in pipeline elements and supporting power of pipe-line saddle with provision for seismic loads to plan measures on seismic protection

  11. Nuclear Oversight Function at Krsko NPP

    International Nuclear Information System (INIS)

    Bozin, B.; Kavsek, D.

    2010-01-01

    The nuclear oversight function is used at the Krsko NPP constructively to strengthen safety and improve performance. Nuclear safety is kept under constant examination through a variety of monitoring techniques and activities, some of which provide an independent review. The nuclear oversight function at the Krsko NPP is accomplished by Quality and Nuclear Oversight Division (SKV). SKV has completed its mission through a combination of compliance, performance and effectiveness-based assessments. The performance-based assessment is an assessment using various techniques (observations, interviews, walk-downs, document reviews) to assure compliance with standards and regulations, obtain insight into performance, performance trends and also to identify opportunities to improve effectiveness of implementation. Generally, the performance-based approach to oversight function is based on some essential elements. The most important one which is developed and implemented is an oversight program (procedure). The program focuses on techniques, activities and objectives commensurate with their significance to plant operational safety. These techniques and activities are: self-assessments, assessments, audits, performance indicators, monitoring of corrective action program (CAP), industry independent reviews (such as IAEA's OSART and WANO Peer Review), industry benchmarking etc. Graded approach is an inherent product of a performance based program and ranking process. It is important not only to focus on the highest ranked performance based attributes but to lead to effective utilization of an oversight program. The attributes selected for oversight need to be based on plant specific experience, current industry operating experience, supplier's performance and quality issues. Collaboration within the industry and effective utility oversight of processes and design activities are essential for achieving good plant performance. So the oversight program must integrate relevant

  12. Selection of index complex for the NPP operator activity efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Kolesnik, A I; Chertorizhskij, E A

    1984-01-01

    Preconditions for choice of NPP operator activity efficiency index are determined. Results of the choice are given and a method for determination of generalized and particular parameters by means of which NPP operator activity efficiency can be estimated is considered. An algorithm of diagnosis of reason for unsuccess of operator activity based on assessment of psychological factors of complicacy is suggested.

  13. Unit Commissioning of “Belene” NPP (Bulgaria)

    International Nuclear Information System (INIS)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  14. NPP electrical price and tariff in the world

    International Nuclear Information System (INIS)

    Mochamad Nasrullah and Sriyana

    2010-01-01

    Construction of a Nuclear Power Plant (NPP) is always become a controversial issue. Nuclear utility and other party which support the NPP present a calculation of NPP electricity cost too optimistic. However for utility and other party that contra to nuclear present a calculation of NPP electricity cost too pessimistic. This study present to reduce the controversy of nuclear cost. In this study, capital cost (Engineering Procurement Construction, EPC) was taken from Asian, America and Europe, operating and maintenance cost uses experience data of PLN, and nuclear fuel cost uses data year of 2008 with high price, low price and average price scenario. The methodological tools used to compare electricity generation cost was LEGECOST, a program developed by IAEA (International Atomic Energy Agency), while for electricity tariff- price calculation using a program developed by PLN research and development center. With the discount rate 10%, the result shows that the cheapest electricity generation cost of NPP is less than 40 mills/kWh, and average electricity tariff was 55 mills/kWh. In the Europe countries the electricity tariff more expensive than NPP in Asia. However generating cost and electricity tariff of NPP in United Stated of America (USA) less competitive because investment cost more expensive. Generating cost and electricity tariff was different at each country depend on salary, labor wage, materials price, construction specification, regulation related to NPP and environment aspect. (author)

  15. Transition cycle fuel management problems of NPP Krsko

    International Nuclear Information System (INIS)

    Petrovic, B.; Pevec, D.; Smuc, T.; Urli, N.

    1989-01-01

    Transition cycle fuel management problems are described and illustrated using results and experience attained during core reload design of NPP Krsko. Improved version of computer code package PSU-LEOPARD/Mcrac is successfully applied to NPP Krsko loading pattern design. (author)

  16. Using the digital reactor control systems at NPP

    International Nuclear Information System (INIS)

    Schirl, G.; Hertel, J.

    2006-01-01

    A conception of application of the digital reactor control systems (RCS) at NPP is presented. The digital RCS architecture and safety ensuring are considered. The strategy and algorithm of the operating NPP equipping with the new digital RCS are given too [ru

  17. Use of NESTLE computer code for NPP transition process analysis

    International Nuclear Information System (INIS)

    Gal'chenko, V.V.

    2001-01-01

    A newly created WWER-440 reactor model with use NESTLE code is discussed. Results of 'fast' and 'slow' transition processes based on it are presented. This model was developed for Rovno NPP reactor and it can be used also for WWER-1000 reactor in Zaporozhe NPP

  18. Balancing preventive and corrective maintenance in Cernavoda Unit 1 NPP

    International Nuclear Information System (INIS)

    Riedel, M.; Marinescu, S.

    2000-01-01

    The paper presents a short reminder of Romania's Cernavoda NPP entering commercial operation and a brief description of the CANDU-6 project on which Unit 1 is based. The short term objectives of the maintenance management, the status of the existing maintenance programmes as well as future predictable maintenance programmes are outlined together with the Government plan to complete the balance of NPP. (author)

  19. Training Nuclear Power Specialists

    International Nuclear Information System (INIS)

    Paulikas, V.

    2003-01-01

    Situation of preparation of nuclear energy specialists in Lithuania is presented. Nuclear engineers are being prepared at Kaunas University of Technology. In view with decision to decommission Unit 1, the Ignalina NPP is limiting the number of new personnel to fill in vacancies. The main attention is given to the training courses for improvement skills of existing Ignalina NPP, VATESI personnel. Main topics of the training courses are listed. Comparison with previous years on personnel hired and dismissed in Ignalina NPP is made

  20. Monitoring program of surrounding of the NPP SE-EBO

    International Nuclear Information System (INIS)

    Dobis, L.; Kostial, J.

    1997-01-01

    The paper dealt with monitoring program of radiation control of surrounding of the NPP Bohunice, which has the aim: (1) to ensure the control of influence of work of the NPP Bohunice on the environment in their surrounding; (2) to ensure the back-ground for regular brief of control and supervisory organs about condition of the environment in surrounding of the NPP Bohunice; (3) to maintain the expected technical level of control of the NPP Bohunice and to exploit optimally the technical means; (4) to solicit permanently the data about the radioactivity of environment in surrounding of the NPP Bohunice for forming of files of the data; (5) to exploit purposefully the technical equipment, technical workers and to maintain their in permanent emergency and technical eligibility for the case of the breakdown; (6) to obtain permanently the files of the values for qualification of the reference levels. This program of monitoring includes the radiation control of surrounding of the NPP Bohunice, in the time of normal work of power-station's blocks, inclusively of all types of trouble-shooting and repairer works in surrounding of the NPP Bohunice, up to distance 20 km from power-station. The monitoring includes: outlets from the NPP Bohunice, monitoring of radiation characteristics in surrounding of the NPP Bohunice, (aerosols, fall-outs, soil), the links of food chains: (grass and fodder, milk, agriculture products), hydrosphere in surrounding (surface waters, drink water, bores of radiation control in complex of the NPP Bohunice, components of the hydrosphere), measurement of radiation from external sources (measurement of the dose rates, measurement of the doses [sk

  1. Economical aspect of the decommissioning for NPP

    International Nuclear Information System (INIS)

    Daryoko, M.

    1998-01-01

    The estimated, analysed and founding of the economical aspect at decommissioning of Nuclear Power Plant (NPP) have been studied. The data that have been obtained from literature, then the calculation and analysing have been done base to the future condition. The cost for NPP decommissioning depend on the internal factor such as type, capacity and safe storage time, and the external factor such as policy, manpower and the technology preparation. The successfulness of funding, depend on the rate of inflation, discount rate of interest and the currency fluctuation. For the internal factor, the influence of the type of the reactor (BWR or PWR) to the decommissioning cost is negligible, the big reactor capacity (±1100 MW), and the safe storage between 30 to 100 years are recommended, and for the external factor, specially Indonesia, to meet the future need the ratio of decommissioning cost and capital cost will be lower than in develop countries at the present (10%). The ratio between decommissioning fund and electricity generation cost relatively very low, are more less than 1.79 % for 30 years safe storage, and discount rate of interest 3%, or more less than 0.30 % for safe storage 30 years, and discount rate of interest 6%. (author)

  2. Central alarm system replacement in NPP Krsko

    International Nuclear Information System (INIS)

    Cicvaric, D.; Susnic, M.; Djetelic, N.

    2004-01-01

    Current NPP Krsko central alarm system consists of three main segments. Main Control Board alarm system (BETA 1000), Ventilation Control Board alarm system (BETA 1000) and Electrical Control Board alarm system (BETA 1100). All sections are equipped with specific BetaTone audible alarms and silence, acknowledge as well as test push buttons. The main reason for central alarm system replacement is system obsolescence and problems with maintenance, due to lack of spare parts. Other issue is lack of system redundancy, which could lead to loss of several Alarm Light Boxes in the event of particular power supply failure. Current central alarm system does not provide means of alarm optimization, grouping or prioritization. There are three main options for central alarm system replacement: Conventional annunciator system, hybrid annunciator system and advanced alarm system. Advanced alarm system implementation requires Main Control Board upgrade, integration of process instrumentation and plant process computer as well as long time for replacement. NPP Krsko has decided to implement hybrid alarm system with patchwork approach. The new central alarm system will be stand alone, digital, with advanced filtering and alarm grouping options. Sequence of event recorder will be linked with plant process computer and time synchronized with redundant GPS signal. Advanced functions such as link to plant procedures will be implemented with plant process computer upgrade in outage 2006. Central alarm system replacement is due in outage 2004.(author)

  3. Plant lifetime management at Jose Cabrera NPP

    International Nuclear Information System (INIS)

    Martin, Jorge; Garcia, Piedad

    1998-01-01

    This paper presents the results obtained during the development and implementation of the Jose Cabrera NPP Lifetime Management Program according to the methodology applied in the Plant. The implementation of the Lifetime Management Program began in 1995 with the elaboration of the annual revision document 'Lifetime Management Plan', which describes the level of development of the Lifetime Management activities, the results that have been obtained during the implementation of the Program, and the schedule of the upcoming activities. The drawing up of a weighted list of 135 important components and the elaboration of 17 dossiers integrating the ageing mechanisms analysis and its corresponding evaluation, control and mitigation methods, were the result of the activities completed during 1996. A group of 62 component/degradation phenomena pairs with a high degradation risk classification has been considered within the scope of the activity 'Assessment of Maintenance Practices. Improvement Proposal', performed by the plant during 1997 and the first term of 1998 in parallel with other Lifetime Management related activities. The results obtained within this activity have revealed for the components included in the scope of the assessment that the associated degradation phenomena are practically covered by the current maintenance, inspection and testing practices. Recommendations and improvements of the maintenance practices have been particularly proposed from a technical, supporting, proceeding and documentary point of view, and currently an analysis is being made in relation to the feasibility of implementing them at the Jose Cabrera NPP. (author)

  4. NPP unusual events: data, analysis and application

    International Nuclear Information System (INIS)

    Tolstykh, V.

    1990-01-01

    Subject of the paper are the IAEA cooperative patterns of unusual events data treatment and utilization of the operating safety experience feedback. The Incident Reporting System (IRS) and the Analysis of Safety Significant Event Team (ASSET) are discussed. The IRS methodology in collection, handling, assessment and dissemination of data on NPP unusual events (deviations, incidents and accidents) occurring during operations, surveillance and maintenance is outlined by the reports gathering and issuing practice, the experts assessment procedures and the parameters of the system. After 7 years of existence the IAEA-IRS contains over 1000 reports and receives 1.5-4% of the total information on unusual events. The author considers the reports only as detailed technical 'records' of events requiring assessment. The ASSET approaches implying an in-depth occurrences analysis directed towards level-1 PSA utilization are commented on. The experts evaluated root causes for the reported events and some trends are presented. Generally, internal events due to unexpected paths of water in the nuclear installations, occurrences related to the integrity of the primary heat transport systems, events associated with the engineered safety systems and events involving human factor represent the large groups deserving close attention. Personal recommendations on how to use the events related information use for NPP safety improvement are given. 2 tabs (R.Ts)

  5. Corrective action program at Krsko NPP

    Energy Technology Data Exchange (ETDEWEB)

    Skaler, F; Divjak, G; Kavsek, D [NPP Krsko, Krsko (Slovenia)

    2004-07-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  6. Utilization of NPP Krsko plant specific simulator

    International Nuclear Information System (INIS)

    Fifnja, I.; Pribozic, F.; Krajnc, J.

    2002-01-01

    NPP Krsko started with licensed operator training using its own plant-specific full scope simulator in April 2000. Today, two years after simulator was completed, the benefits of simulator use are visible in various fields. The simulator was effectively used to conduct licensed operator continuing training and practical examinations. Two-year continuous training program was designed to help maintain and improve operator performance. The simulator was also used to provide just-in-time training prior to plant evolutions. Together with licensed operators the non-licensed operators are also included into simulator training to provide affective team training opportunity and to foster good communication and increase scenario realism. Now, the first group of initial licensed operator training using plant-specific simulator is also almost completed. It is the first time that NPP Krsko training department conducted complete initial training and this will represent the great experience for future training. Besides training, the simulator was also utilized for procedure development and validation, operating standards development, testing of plant modifications and other activities, like emergency preparedness procedures validation and training exercises.(author)

  7. Forsmark NPP I and C modernization strategy

    International Nuclear Information System (INIS)

    Hallen, J.; Rydahl, I.; Kloow, L.

    2003-01-01

    By the year 2000, the Forsmark NPP was halfway through the planned plant life. As early as 1995, Forsmark realized that the old analog I and C equipment would need to be replaced before 2005. At the Forsmark NPP they had strength of a vision of an integrated modernization and a strategy to reach the vision. Without vision and strategy, the plant could end up with a fragmented plant I and C-architecture that is not cost-effective or operable. This paper will address several questions that led to the current modernization program in Forsmark, the more important questions are: What would happen if the modernization would be postponed? Which main requirements were to be achieved by means of the modernization strategy? The goal of a completed plant modernization program is a totally integrated system solution and what factors were considered during the modernization? How to gain acceptance from the operational staff in designing Control Room and Soft Control Displays? What are the important roles for the staff and organization to reach the end goal? What has been the experience to date and what are the lessons learned? Thanks to the long term co-operation between Forsmark and Westinghouse the modernization has been very successful for both parties. (orig.)

  8. NPP Krsko Periodic Safety Review action plan

    International Nuclear Information System (INIS)

    Bilic Zabric, T.

    2006-01-01

    In the current, internationally accepted, safety philosophy Periodic Safety Reviews (PSRs) are comprehensive reviews aimed at the verification that an operating NPP remains safe when judged against current safety objectives and practices and that adequate arrangements are in place to maintain an acceptable level of safety. These reviews are complementary to the routine and special safety reviews. They are long time-scale reviews intended to deal with the cumulative effects of plant ageing, modifications, operating experience and technical developments, which are not so easily comprehended over the shorter time-scale routine of safety reviews. The review was completed in 2005 and the next period will see the implementation of the action plan including some plant upgrades. The action plan lists issues that should be implemented at NPP Krsko together with associated milestones. The milestones were assumed based on best estimate resource availability and their ends can be potentially floated. In some cases, multiple corrective measures may be postulated to provide resolution for a given safety issue. The Slovenian Nuclear Safety Administration by decree approved the first periodic safety review and the implementation plan of activities arising from it. The entire implementation plan must be carried out by 15 October 2010. Report on the second periodic safety review must be submitted by the NEK not later than 15 December 2013. (author)

  9. Fiddle at financing of Mochovce NPP

    International Nuclear Information System (INIS)

    Beer, G.

    2003-01-01

    Slovak police found out and documented racket in financing of third and fourth block of Mochovce NPP. Damage should be 144 millions Slovak crowns. Investigator consequently accused twenty-three Slovaks from foundation, trump up and supporting of criminal group and deception. Two persons are suggested to be taken to custody. Skoda Praha, which was general supplier of construction for 1,5 billions Slovak crowns, in 2001 allowed to create a connection to let the finances between Slovenske elektrarne, a.s., Bratislava as investor and Skoda as subcontractor to be paid through three mediator companies. Companies got authorization to balance the relationship among all interested subjects. Confused network of 118 treaties was created. They invoiced reward from money current based on these treaties. Reward represented up to 70 per cent of transferred resources in some cases. According to Minister of Domestic Affairs Vladimir Palko it will be necessary to find out where is actually the money. For the time being nobody from NPP is among accused. (Author)

  10. Brief Assessment of Krsko NPP Decommissioning Costs

    International Nuclear Information System (INIS)

    Skanata, D.; Medakovic, S.; Debrecin, N.

    2000-01-01

    The first part of the paper gives a brief description of decommissioning scenarios and models of financing the decommissioning of NPPs. The second part contains a review of decommissioning costs for certain PWR plants with a brief description of methods used for that purpose. The third part of the paper the authors dedicated to the assessment of decommissioning costs for Krsko NPP. It does not deal with ownership relations and obligations ensuing from them. It starts from the simple point that decommissioning is an structure of the decommissioning fund is composed of three basic cost items of which the first refers to radioactive waste management, the second to storage and disposal of the spent nuclear fuel and the third to decommissioning itself. The assessment belongs to the category of preliminary activities and as such has a limited scope and meaning. Nevertheless, the authors believe that it offers a useful insight into the basic costs that will burden the decommissioning fund of Krsko NPP. (author)

  11. Corrective action program at Krsko NPP

    International Nuclear Information System (INIS)

    Skaler, F.; Divjak, G.; Kavsek, D.

    2004-01-01

    The Krsko NPP develops software that enables electronic reporting of all kind of deviations and suggestions for improvement at the plant. All the employees and permanent subcontractors have the access to the system and can report deviations. NPP has centralized decision process for the distribution of reported deviation. At this point all direct actions are electronically tracked. The immediate benefits of this new tool were: Reporting threshold has been lowered; Number of reporting people has increased; One computerized form for all processes; Decision, which process will solve the deviation, is centralized; All types of deviation are in the same environment; Our experiences of the processes are incorporated in the program; Control of work that has been done; Archiving is electronic only. Software basic data: Application system Corrective action program is a WEB application. Data is stored in Oracle 8.1.7 i database. Users access application through PL/SQL gateway on Oracle 9i Application Server 1.0.2. using Microsoft Internet Explorer browsers(Version 5 or later). Reports are implemented by Oracle Reports 6i. Menus are designed by Apycom Java Menus and Buttons v4.23. Our Presentation will include: Basic idea; Implementation change management; Demonstration of the program.(author)

  12. Monitors for the surveillance of NPP components

    International Nuclear Information System (INIS)

    Giera, H.D.; Grabner, A.; Hessel, G.; Koeppen, H.E.; Liewers, P.; Schumann, P.; Weiss, F.P.; Kunze, U.; Pfeiffer, G.

    1985-01-01

    Noise diagnostics have reached a level where it is possible and efficient to integrate this method as far as possible into the control and safety system of the NPP. The communication between the noise diagnostic system and the plant operator is the main problem of integration. It is necessary to refine the diagnostic results in such a manner that the operator can use them without being skilled in noise analysis respectively without contacting a noise specialist. Moreover, in this way the noise specialist can be released from routine surveillance. For selected processes which have already intensively been investigated because of their inherent risk this can be achieved by means of autonomously working monitors. Independently the monitors perform signal processing and diagnosis. In general this means that they classify the technical condition of the monitored component into one of the two categories: ''normal'' or ''anomalous''. The result will be annunciated to the plant operator who will in the first step of the development contact the noise specialist only if anomalies have occurred in order to clarify the cause. At the NPP ''Bruno Leuschner'' Greifswald, three hardware monitors for loose parts detection, control rod surveillance and main coolant pump diagnosis are being tested. Additionally a so-called software monitor for diagnosing the pressure vessel vibrations is in preparation. The techniques and the hardware used for the monitors as well as planned further improvements of the integration of noise diagnostics into the control and safety system are discussed in this paper. (author)

  13. Equipment Reliability Process in Krsko NPP

    International Nuclear Information System (INIS)

    Gluhak, M.

    2016-01-01

    To ensure long-term safe and reliable plant operation, equipment operability and availability must also be ensured by setting a group of processes to be established within the nuclear power plant. Equipment reliability process represents the integration and coordination of important equipment reliability activities into one process, which enables equipment performance and condition monitoring, preventive maintenance activities development, implementation and optimization, continuous improvement of the processes and long term planning. The initiative for introducing systematic approach for equipment reliability assuring came from US nuclear industry guided by INPO (Institute of Nuclear Power Operations) and by participation of several US nuclear utilities. As a result of the initiative, first edition of INPO document AP-913, 'Equipment Reliability Process Description' was issued and it became a basic document for implementation of equipment reliability process for the whole nuclear industry. The scope of equipment reliability process in Krsko NPP consists of following programs: equipment criticality classification, preventive maintenance program, corrective action program, system health reports and long-term investment plan. By implementation, supervision and continuous improvement of those programs, guided by more than thirty years of operating experience, Krsko NPP will continue to be on a track of safe and reliable operation until the end of prolonged life time. (author).

  14. Automated personal dosimetry monitoring system for NPP

    International Nuclear Information System (INIS)

    Chanyshev, E.; Chechyotkin, N.; Kondratev, A.; Plyshevskaya, D.

    2006-01-01

    Full text: Radiation safety of personnel at nuclear power plants (NPP) is a priority aim. Degree of radiation exposure of personnel is defined by many factors: NPP design, operation of equipment, organizational management of radiation hazardous works and, certainly, safety culture of every employee. Automated Personal Dosimetry Monitoring System (A.P.D.M.S.) is applied at all nuclear power plants nowadays in Russia to eliminate the possibility of occupational radiation exposure beyond regulated level under different modes of NPP operation. A.P.D.M.S. provides individual radiation dose registration. In the paper the efforts of Design Bureau 'Promengineering' in construction of software and hardware complex of A.P.D.M.S. (S.H.W. A.P.D.M.S.) for NPP with PWR are presented. The developed complex is intended to automatize activities of radiation safety department when caring out individual dosimetry control. The complex covers all main processes concerning individual monitoring of external and internal radiation exposure as well as dose recording, management, and planning. S.H.W. A.P.D.M.S. is a multi-purpose system which software was designed on the modular approach. This approach presumes modification and extension of software using new components (modules) without changes in other components. Such structure makes the system flexible and allows modifying it in case of implementation a new radiation safety requirements and extending the scope of dosimetry monitoring. That gives the possibility to include with time new kinds of dosimetry control for Russian NPP in compliance with IAEA recommendations, for instance, control of the equivalent dose rate to the skin and the equivalent dose rate to the lens of the eye S.H.W. A.P.D.M.S. provides dosimetry control as follows: Current monitoring of external radiation exposure: - Gamma radiation dose measurement using radio-photoluminescent personal dosimeters. - Neutron radiation dose measurement using thermoluminescent

  15. Report on Fukushima Daiichi NPP precursor events

    International Nuclear Information System (INIS)

    2014-01-01

    The main questions to be answered by this report were: The Fukushima Daiichi NPP accident, could it have been prevented? If there is a next severe accident, may it be prevented? To answer the first question, the report addressed several aspects. First, the report investigated whether precursors to the Fukushima Daiichi NPP accident existed in the operating experience; second, the reasons why these precursors did not evolve into a severe accident. Third, whether lessons learned from these precursor events were adequately considered by member countries; and finally, if the operating experience feedback system needs to be improved, based on the previous analysis. To address the second question which is much more challenging, the report considered precursor events identified through a search and analysis of the IRS database and also precursors events based on risk significance. Both methods can point out areas where further work may be needed, even if it depends heavily on design and site-specific factors. From the operating experience side, more efforts are needed to ensure timely and full implementation of lessons learnt from precursor events. Concerning risk considerations, a combined use of risk precursors and operating experience may drive to effective changes to plants to reduce risk. The report also contains a short description and evaluation of selected precursors that are related to the course of the Fukushima Daiichi NPP accident. The report addresses the question whether operating experience feedback can be effectively used to identify plant vulnerabilities and minimize potential for severe core damage accidents. Based on several of the precursor events national or international in-depth evaluations were started. The vulnerability of NPPs due to external and internal flooding has clearly been addressed. In addition to the IRS based investigation, the WGRISK was asked to identify important precursor events based on risk significance. These precursors have

  16. ATUCHA I NPP - Emergency drill practice

    International Nuclear Information System (INIS)

    Sanda, Alejandro; Rosales, Gabriel

    2008-01-01

    Full text: Atucha I NPP performs an Emergency Drill Practice once a year. Its main goals are: -) Fulfill the requirements of the Argentine Nuclear Regulatory Authority (ARN) regarding Atucha I NPP's Operating License; -) Fulfill the commitment with the community regarding the safe and reliable operation Atucha I NPP; -) Verify the response of the Civil Organizations, Security Forces, and Armed Forces, as well as the correct application of the Emergency Plan; -) Perform the 'General Alarm Drill' periodic control; -) Perform a re-training of the members of the Security Advisor Internal Committee (CIAS) on the Internal and External Aspects of the Emergency Plan and on the related procedures; -) Test the Emergency Communications System. New goals are added every year, considering the Drill's scope. This drill comprises two different kinds of practices: Internal practices (practices in the station, with our personnel) and external practices (practices outside the station with governmental organizations). Internal practices comprise: -) Internal and external communications practices; -) Acoustic alarms; -) Personnel gathering in the Meeting Points; -) Safety of selected Meeting Points; -) Personnel count, selective evacuation; -) Iodide Potassium pills distribution; -) CICE (Internal Group for Emergency Control) Coordination. External practices comprise: -) Nuclear Regulatory Authority; -) Argentine Navy, Comando Area Naval Fluvial, Base Naval Zarate; -) Lima firemen; -) Zarate firemen; -) Municipal Civil Defense (Zarate and Lima); -) National Guard, Escuadron Atucha; -) Zarate Regional Hospital; -) Lima Police Department; -) Zarate Police Department; -) Argentine Coast Guard, Zarate; -) Local radios: Radio FM Libre, FM El Sitio; -) First Aid clinic. The following activities are performed together with the aforementioned organizations: -) Formation of an 'Operative committee'; -) Evacuation of citizens in a 3 km radio; -) Control of every access to Lima; -) Control of

  17. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  18. Construction of large-thickness sand cushions for NPP foundations

    International Nuclear Information System (INIS)

    Krantsfel'd, Ya.L.; Losievskaya, I.K.; Kovalenko, R.P.; Mutalipov, A.

    1982-01-01

    A study is made on some technological peculiarities of preparation of NPP foundations and control methods of foundation density. As an example the experience of cement-sand foundation construction for two 900 MW power-units at the Koeberg South Africa NPP is briefly described. The experience of artificial foundation construction at this NPP indicates both the possibility of obtaining the required quality of cement-sand cushions and commercial construction of large volume of such cushions by acceptable rates and the necessity of unification of work quality characteristics

  19. NPP Krsko Containment Response Following Main Steam Line Break

    International Nuclear Information System (INIS)

    Spalj, S.; Grgic, D.; Cavlina, N.

    2000-01-01

    This paper presents the calculation of thermohydraulic environmental parameters (pressure and temperature) inside containment of Krsko NPP after postulated Main Steam Line Break (MSLB) accident. This analysis was done as a part of the ambient parameters specification in the frame of the NPP Krsko Equipment Qualification (EQ) project. The RELAP5/mod2 computer code was used for the determination of MSLB mass and energy release and computer code GOTHIC was used to calculate pressure and temperature profiles inside NPP Krsko containment. The analysis was performed for spectrum of break sizes to account for possible steam superheating during accidents with smaller break sizes. (author)

  20. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  1. A reliability evaluation method for NPP safety DCS application software

    International Nuclear Information System (INIS)

    Li Yunjian; Zhang Lei; Liu Yuan

    2014-01-01

    In the field of nuclear power plant (NPP) digital i and c application, reliability evaluation for safety DCS application software is a key obstacle to be removed. In order to quantitatively evaluate reliability of NPP safety DCS application software, this paper propose a reliability evaluating method based on software development life cycle every stage's v and v defects density characteristics, by which the operating reliability level of the software can be predicted before its delivery, and helps to improve the reliability of NPP safety important software. (authors)

  2. Construction of Belene NPP in Bulgaria

    International Nuclear Information System (INIS)

    JSC Atomstroyexport

    2010-01-01

    Presentations concluding remarks: ASE has performed its scope of responsibilities under the Agreement of 29.11.2006 and has achieved great results regarding both the Technical part of the Project and its organization; Though there is a number of unsettled issues under the Project, in particular, the issue related to financing, ASE is willing to continue the Project and works on its development; The Russian Party believes that in case the activities under the Project are continued, Belene NPP will be constructed with high quality and within the time limits prescribed in the Agreement of 29.11.2006: 59 months before Unit 1 take-over into operation and 71 month before Unit 2 take-over into operation, starting from concreting of foundation slab of Unit 1 Reactor building

  3. Crushed stone production plant for NPP building

    International Nuclear Information System (INIS)

    Obolenskij, V.Ya.

    1982-01-01

    The project of the granite-crushed stone quarry - the large modern plant producing building materials, is presented. The quarry is designated for providing NPP and other power objects building with high-strength crushed stone. The plant consists of: quarry; crushing-sorting plant with maintenance objects arranged on its ground; basis and service stores of explosive materials; tail facility and purifying systems; water supply purifying stations; water storage basin. The plant is reserved for 2335 thousand m 3 yearly utoput of crushed stone; the staff consists of 535 persons, the budgeted cost of building is 26.6 million rubles. Physicochemical characteristics of granosyenites of the ''Granitnoye'' deposit - the raw material resource base of the plant and technological scheme of the crushing-sorting plant are given. Planned measures on building organization and recultivation of disturbed grounds are presented

  4. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  5. Students education and training for Slovak NPP

    International Nuclear Information System (INIS)

    Slugen, V.; Lipka, J.; Hascik, J.; Miglierini, M.

    2005-01-01

    Slovak University of Technology is the largest and also the oldest university of technology in Slovakia. It is certain that more than 50% of the highly-educated technicians who are currently working in the nuclear industry have graduated from this university. The Department of Nuclear Physics and Technology of the Faculty of Electrical Engineering and Information Technology as one of the seven faculties of this University feels the responsibility to impart proper engineering education and training for Slovak NPP operating staff. The education process is realised via undergraduate (BSc), graduate (MSc) and postgraduate (PhD) study as well as via specialised training courses within the framework of a continuous education system. (author)

  6. Industry Operating Experience Process at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Bozin, B.; Cizmek, R.

    2012-01-01

    Experience has shown that number of minor events and near misses, usually without immediate or significant impact to plant safety and reliability, are precursors of significant or severe events due to the same or similar root or apparent cause(s). It is therefore desirable to identify and analyze weaknesses of the precursor problems (events) in order to prevent occurrence of significant events. Theoretically, significant events could be prevented from occurring if the root cause(s) of these precursor problems could be identified and eliminated. The Operating Experience Program identifies such event precursors and by reporting them to the industry, plant specific corrective actions can be taken to prevent events at other operational plants. The intent of the Operating Experience Program is therefore to improve nuclear power plant safety and reliability of the operating nuclear power plants. Each plant develops its own Operating Experience Program in order to learn from the in-house operating experience as well as from the world community of nuclear plants. The effective use of operating experience includes analyzing both plant and industry events in order to identify fundamental weaknesses and then determining appropriate plant-specific actions that will minimize the likelihood of similar events. Learning and applying the lessons from operating experience is an integral part of station safety culture and is encouraged by managers throughout the top plant administrative programs and procedures. Krsko NPP is developed it own Operating Experience Program by using the most relevant INPO/WANO/IAEA guidelines as well as its own knowledge, skills an operating practice. The Operating Experience Program is a part of the Corrective Action Program, which is among top management programs, thus program is strongly encouraged by top management. The purpose of Operating Experience Program is to provide guidance for using, sharing, and evaluating operating experience information

  7. N-16 monitors: Almaraz NPP experience

    International Nuclear Information System (INIS)

    Adrada, J.

    1997-01-01

    Almaraz Nuclear Power Plant has installed N-16 monitors - one per steam generator - to control the leakage rate through the steam generator tubes after the application of leak before break (LBB) criteria for the top tube sheet (TTS). After several years of operation with the N-16 monitors, Almaraz NPP experience may be summarized as follows: N-16 monitors are very useful to follow the steam generator leak rate trend and to detect an incipient tube rupture; but they do not provide an exact absolute leak rate value, mainly when there are small leaks. The evolution of the measured N-16 leak rates varies along the fuel cycle, with the same trend for the 3 steam generators. This behaviour is associated with the primary water chemistry evolution along the cycle

  8. Environmental qualification program for Krsko NPP

    International Nuclear Information System (INIS)

    Cerjak, J.; Klenovsek, P.; Pavsek, J.; Freeland, K.R.; Spalj, S.

    1998-01-01

    NEK plant components, including those critical to safe plant operation, deteriorate and wear over service life due to the effects of aging and harsh environmental conditions. Since the plant environment is a source of common-cause failures, an Environmental Qualification (EQ) program is required to ensure and demonstrate the ability of safety-related equipment to perform its design safety function during a design-basis (DBE), even after aging over its service life in the plant. EQ is a requirement for plants licensed by the US NRC, in accordance with 10 CFR 50.49, Regulatory Guide 1.89, NUREG-0588, and IEEE-323. This paper presents the current EQ Program status at Krsko NPP.(author)

  9. Fuel consumption organization at the Kola NPP

    International Nuclear Information System (INIS)

    Matveev, A.A.; Ignatenko, E.I.; Volkov, A.P.; Trofimov, B.A.

    1981-01-01

    Problems of using NPPs in the power systems including hydroelectric power plants and NPPs are considered on the example of the Kola power system. The methods of the WWER-440 reactor fuel loading formation, reactor power forcing, optimization of volumes and time of the NPP main equipment planned maintenance are discussed. It is concluded that the optimal methods for the WWER-440 reactor fuel loading formation are the following: reactor make-up with the lesser number of fuel assemblies with maximum designed enrichment; for the case of decreased loading energy capacity displacement of make-up fuel with 2.4% enrichment by the fuel with 3.6% enrichment when preserving the designed number of make-up fuel assemblies [ru

  10. Feature article. Fukushima Daiichi NPP accident

    International Nuclear Information System (INIS)

    Ekarinai, Masashi; Ake, Yutaka; Narabayashi, Tadashi

    2011-01-01

    This special feature article consisted of five reports and the minutes of emergency discussion meeting on Fukushima Daiichi Nuclear Power Plant (NPP) accident. Effects of the accident on future electricity supply of electric utilities and also on business development of nuclear industries were discussed. Activities of senior network team of atomic energy society of Japan (AESJ) to conduct severe accident analysis and early restoration from the accident were introduced. Circulating injection reactor cooling system and zeolite decontamination system of accumulated contaminated water was proposed. Effects of the accident on overseas reaction on nuclear development were also reported as well as personal experience of the professor in the US west coast on communications. (T. Tanaka)

  11. Features of the Kozloduy NPP management system

    International Nuclear Information System (INIS)

    2016-01-01

    The Kozloduy NPP management system was built taking into account the specifics of the organizational structure and management of the Company, actual processes and practices, and is oriented towards future development, with the participation of all staff. Additional requirements integrated in the system that distinguish it from general industrial requirements of management systems are: priority of nuclear safety; safety culture; knowledge management including extraction and storage of 'hidden knowledge'; periodic self-assessments; use of graded response to the products and activities; use of 'conservative approach' in decision making;; possibilities for self learning and creating of a vision of 'leaders' and 'professional workers in nuclear energy

  12. Seismic analysis and design of NPP structures

    International Nuclear Information System (INIS)

    de Carvalho Santos, S.H.; da Silva, R.E.

    1989-01-01

    Numerical methods for static and dynamic analysis of structures, as well as for the design of individual structural elements under the applied loads are under continuous development, being very sophisticated methods nowadays available for the engineering practice. Nevertheless, this sophistication will be useless if some important aspects necessary to assure full compatability between analysis and design are disregarded. Some of these aspects are discussed herein. This paper presents an integrated approach for the seismic analysis and design of NPP structures: the development of models for the seismic analysis, the distribution of the global seismic forces among the seismic-resistant elements and the criteria for the design of the individual elements for combined static and dynamic forces are the main topics to be discussed herein. The proposed methodology is illustrated. Some examples taken from the project practice are presented for illustration the exposed concepts

  13. Electrohydraulic system to control NPP turbines

    International Nuclear Information System (INIS)

    Kosyak, Yu.F.; Virchenko, M.A.; Rozhanskij, V.E.; Rokhlenko, V.Yu.; Gapunin, A.Ya.; Zhornitskaya, T.Ya.; Rasskazov, I.Eh.; Butsenko, V.N.; Brajnin, L.S.; Makarenko, N.I.

    1985-01-01

    Operation regimes of electrohydraulic regulation system (EHRS) of NPP turbines, designed to control the turbine in start-up and working conditions, have been decribed. In start-up regimes EHRS ensures the testing of control valves of the turbine, the turn of the turbine from zero to the nominal rotation frequency (automatic, semiautomatic and manual regulation), turbine acceleration to test safety automatic systems, gradual change in rotation frequency during generator synchronization with circuit. Under working conditions EHRS ensures the maintenance of frequency, power and vapour pressure before the turbine. A block diagram of EHRS is presented. Sensors and electronic part of EHRS are supplied with triple reservation, which ensures a high relaibility of the system

  14. Control system for NPP powerfull turbines

    International Nuclear Information System (INIS)

    Osipenko, V.D.; Rozhanskij, V.E.; Rokhlenko, V.Yu.

    1985-01-01

    A control system for NPP 1000 MW turbines safety is described. The turbine safety system has a hydraulic drive to actuate in case of increasipg of rotational speed of a turbine rotor and an electrohydraulic drce to operate in case of pressure reduction in the lubrication system, axial displacement deviation, etc. The system is highly reliable due to application of a safety system without slide valves and long-term operation of hydraulic controls in guarding conditions; the system epsures multifunctional control with high accuracy and speed due to application of the intricate electronic part, high speed of response with a limited use of high pressure oil due to application of two-pressure pumps, pneumohydraulic accumulators and oil discharge valves. Steady-state serviceability of the system is maintained by devices for valve cooling dawn. A shockless change from electrohydraulic to hydraulic control channels is provided

  15. NPP Cernavoda Unit 2 Financing Completion Works

    International Nuclear Information System (INIS)

    Chirica, T.; Stefanescu, A.; Constantin, C.; Dobrin, M.

    2002-01-01

    NPP Cernavoda Unit 2 completion is the highest priority of the Romanian power sector strategy. The nuclear energy represents, through its technological features of adopted solution (a CANDU nuclear power plant) and also through technological and economical performance indicators, the best solution to fulfill the demands concerning the sustainable development and the electricity request. The guidelines of energy strategy regarding the nuclear sector development in Romania are framing in the general policy for energy system development at least costs and they are responding to requests concerning the environment and people protection. The paper presents the financing alternatives for Unit 2 completion works taking into consideration the financing market conditions. The paper presents the impact of the financing conditions on the project efficiency, as well as the facilities offered by the Romanian Government in order to support this project. (author)

  16. Training change control process at Cernavoda NPP

    International Nuclear Information System (INIS)

    Valache, Cornelia Mariana

    2005-01-01

    The paper presents the process of 'Training Change Control' at Cernavoda NPP. This process is a systematic approach that allows determination of the most effective training and/or non-training solutions for challenges that may influence the content and conditions for a training program or course. Changes may be the result of: - response to station systems or equipment modifications; - new or revised procedures; - regulatory requirements; - external organizations requirements; - internal evaluations meaning feedback from trainees, trainers, management or post-training evaluations; - self-assessments; - station condition reports; - operating experience (OPEX); - modifications of job scope; - management input. The Training Change Control Process at Cernavoda NPP includes the following aspects. The first step is the identification of all the initiating factors for a potential training change. Then, retain only those, which could have an impact on training and classify them in two categories: as deficiencies or as enhancement suggestions. The process is different for the two categories. The deficiency category supposes the application of the Training Needs Analysis (TNA) process. This is a performance-oriented process, resulting in more competent employees, solving existing and potential performance problems. By using needs analysis to systematically determine what people or courses and programs are expected to do and gathering data to reveal what they are really doing, we can receive a clear picture of the problem and then we can establish corrective action plans to fix it. The process is supported by plant subjects matter and by training specialists. On the other hand, enhancements suggestions are assessed by designated experienced persons and then are implemented in the training process. Regarding these two types of initiating factors for the training change control process, the final result consists of a training improvement, raising the effectiveness, efficiency or

  17. Digital Components in Swedish NPP Power Systems

    International Nuclear Information System (INIS)

    Karlsson, Mattias; Eriksson, Tage

    2015-01-01

    Swedish nuclear power plants have over the last 20 years of operation modernised or exchanged several systems and components of the electrical power system. Within these works, new components based on digital technology have been employed in order to realize functionality that was previously achieved by using electro-mechanical or analogue technology. Components and systems such as relay protection, rectifiers, inverters, variable speed drives and diesel-generator sets are today equipped with digital components. Several of the systems and components fulfil functions with a safety-role in the NPP. Recently, however, a number of incidents have occurred which highlight deficiencies in the design or HMI of the equipment, which warrants questions whether there are generic problems with some applications of digital components that needs to be addressed. The use of digital components has presented cost effective solutions, or even the only available solution on the market enabling a modernisation. The vast majority of systems using digital components have been operating without problems and often contribute to improved safety but the challenge of non-detectable, or non-identifiable, failure modes remain. In this paper, the extent to which digital components are used in Swedish NPP power systems will be presented including a description of typical applications. Based on data from maintenance records and fault reports, as well as interviews with designers and maintenance personnel, the main areas where problems have been encountered and where possible risks have been identified will be described. The paper intends to investigate any 'tell-tales' that could give signals of unwanted behaviour. Furthermore, particular benefits experienced by using digital components will be highlighted. The paper will also discuss the safety relevance of these findings and suggest measures to improve safety in the application of digital components in power systems. (authors)

  18. Plant performance monitoring program at Krsko NPP

    International Nuclear Information System (INIS)

    Bach, B.; Kavsek, D.

    2004-01-01

    A high level of nuclear safety and plant reliability results from the complex interaction of a good design, operational safety and human performance. This is the reason for establishing a set of operational plant safety performance indicators, to enable monitoring of both plant performance and progress. Performance indicators are also used for setting challenging targets and goals for improvement, to gain additional perspective on performance relative to other plants and to provide an indication of a potential need to adjust priorities and resources to achieve improved overall plant performance. A specific indicator trend over a certain period can provide an early warning to plant management to evaluate the causes behind the observed changes. In addition to monitoring the changes and trends, it is also necessary to compare the indicators with identified targets and goals to evaluate performance strengths and weaknesses. Plant Performance Monitoring Program at Krsko NPP defines and ensures consistent collection, processing, analysis and use of predefined relevant plant operational data, providing a quantitative indication of nuclear power plant performance. When the program was developed, the conceptual framework described in IAEA TECDOC-1141 Operational Safety Performance Indicators for Nuclear Power Plants was used as its basis in order to secure that a reasonable set of quantitative indications of operational safety performance would be established. Safe, conservative, cautious and reliable operation of the Krsko NPP is a common goal for all plant personnel. It is provided by continuous assurance of both health and safety of the public and employees according to the plant policy stated in program MD-1 Notranje usmeritve in cilji NEK, which is the top plant program. Establishing a program of monitoring and assessing operational plant safety performance indicators represents effective safety culture of plant personnel.(author)

  19. Experimental lysimetric device NPP A-1

    International Nuclear Information System (INIS)

    Matusek, I.; Plsko, J.

    2002-01-01

    In the frame of decommissioning of the NPP A-1 in the locality Jaslovske Bohunice the problem of remedial measures in scope of radioactive contaminated soils is also studied. These soils have originated in the area of the NPP A-1 by different mechanisms as the result of leakages from technology and in the present time they represent the secondary source of contamination of underground waters. Contaminated soils represent the particularity, because we can characterize them as voluminous radioactive contaminated residues with low-level or very low-level activity. EKOSUR Company in the frame of active underground water protection suggested more remedial measures. Two basic tasks are solved in the field of the contaminated soils: rehabilitation of contaminated soils or temporary immobilisation of radionuclides in the contaminated volumes, deposition of rehabilitated soils in the storage of landfill type. In the frame of engineering solution of the landfill storage the question of technology of own deposition of contaminated soils into storage area is important from the safety viewpoint. Therefore the Experimental lysimetric device was built for half-operational test of suggested technologies. This device contains 6 pieces of lysimeters with 6 active volumes of approximately 1 cubic meter. The aim of suggested and in the present time realised experiments is the practical modelling of influence of filtering of waters into storage of contaminated soils in configurational and qualitative different conditions of deposition of soils (for example exploitation of sorption materials). Also the structure of un-rehabilitated soils by the influence of natural downfalls activity is modelled in one lysimeter. In this issue the authors deal with the construction of lysimetric device, proposed experiments as like as gained results of observations. (authors)

  20. Indicators to monitor NPP operational safety performance

    International Nuclear Information System (INIS)

    Gomez-Cobo, Ana

    2002-01-01

    Since December 1995 the IAEA activities on safety performance indicators focused on the elaboration of a framework for the establishment of an operational safety performance indicator programme. The development of this framework began with the consideration of the concept of NPP operational safety performance and the identification of operational safety attributes. For each operational safety attribute, overall indicators, envisioned as providing an overall evaluation of relevant aspects of safety performance, were established. Associated with each overall indicator is a level of strategic indicators intended to provide a bridge from overall to specific indicators. Finally each strategic indicator was supported by a set of specific indicators, which represent quantifiable measures of performance. The programme development was enhanced by pilot plant studies, conducted over a 15 month period from January 1998 to March 1999. The result of all this work is compiled in the IAEA-TECDOC-1141, to be published shortly. This paper presents a summary of this IAEA TECDOC. It describes the operational safety performance indicator framework proposed and discusses the results of and lessons learned from the pilot studies. Despite the efforts described, it is clear that additional research is still necessary in areas such as plant-specific adaptation of proposed frameworks in order to suit individual data collection systems and plant characteristics, indicator selection, indicator definition, goal setting, action thresholds, analysis of trends, indicator display systems, analysis of overall safety performance (i.e., aggregation or combination of indicators), safety culture indicators, qualitative indicators, and use of additional indicators to address issues such as industrial safety attitude and performance, staff welfare, and environmental compliance. This is the rationale for a new IAEA Coordinated Research Project on 'Development and application of indicators to monitor NPP

  1. Detection of primary coolant leaks in NPP

    International Nuclear Information System (INIS)

    Slavov, S.; Bakalov, I.; Vassilev, H.

    2001-01-01

    The thermo-hydraulic analyses of the SG box behaviour of Kozloduy NPP units 3 and 4 in case of small primary circuit leaks and during normal operation of the existing ventilation systems in order to determine the detectable leakages from the primary circuit by analysing different parameters used for the purposes of 'Leak before break' concept, performed by ENPRO Consult Ltd. are presented. The following methods for leak detection: measurement of relative air humidity in SG box (can be used for detection of leaks with flow rate 3.78 l/min within one hour at ambient parameters - temperature 40 0 - 60 0 C and relative humidity form 30% to 60%); measurement of water level in SG box sumps (can not be used for reliable detection of small primary circuit leakages with flow rate about 3.78 l/min); measurement of gaseous radioactivity in SG box( can be used as a general global indication for detection of small leakages from the primary circuit); measurement of condensate flow after the air coolers of P-1 venting system (can be used for primary circuit leak detection) are considered. For determination of the confinement behaviour, a model used with computer code MELCOR has been developed by ENPRO Consult Ltd. A brief summary based on the capabilities of the different methods of leak detection, from the point of view of the applicability of a particular method is given. For both Units 3 and 4 of Kozloduy NPP a qualified complex system for small leak detection is planned to be constructed. Such a system has to unite the following systems: acoustic system for leak detection 'ALUS'; system for control of the tightness of the main primary circuit pipelines by monitoring the local humidity; system for primary circuit leakage detection by measuring condensate run-off in collecting tank after ventilation system P-1 air coolers

  2. Benchmarking HRA methods against different NPP simulator data

    International Nuclear Information System (INIS)

    Petkov, Gueorgui; Filipov, Kalin; Velev, Vladimir; Grigorov, Alexander; Popov, Dimiter; Lazarov, Lazar; Stoichev, Kosta

    2008-01-01

    The paper presents both international and Bulgarian experience in assessing HRA methods, underlying models approaches for their validation and verification by benchmarking HRA methods against different NPP simulator data. The organization, status, methodology and outlooks of the studies are described

  3. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  4. Investigation of interfacing NPP simulators with PSCAD software

    International Nuclear Information System (INIS)

    Zahedi, P.

    2006-01-01

    This paper demonstrates a new method of interfacing a NPP simulator with the PSCAD software so that the interaction between the plant dynamics and the grid dynamics can be studied. Through this method, data extracted from NPP simulator, as an object, will be communicated to a server running PSCAD software. This paper will illustrate the use of Remote Procedure Calls (RPC) as a distributed, client-server based application used to establish a connection between NPP simulator running on UNIX server and PSCAD running on a PC. Using this method, the called procedure need not exist in the same address space as the calling procedure. Communication protocols available in the NPP simulator are used to export data from the simulator. (author)

  5. IPEEE Review of other external events of the NPP Asco

    International Nuclear Information System (INIS)

    Canadell, F.; Aleman, A.; Beltran, F.; Pifarre, D.; Hernandez, H.; Gasca, C.

    2011-01-01

    Within the process of maintaining and updating the risk analysis of the NPP Asco, results from the review of the vulnerability study of the plant against severe accidents caused by external success (Individual Plant Examination of External Events, IPEEE).

  6. Seismic re-evaluation process in Medzamor-2 NPP

    International Nuclear Information System (INIS)

    Zadoyan, P.

    2000-01-01

    Seismic re-evaluation process for Medzamor-2 NPP describes the following topics: program implementation status; re-evaluation program structure; regulatory procedure and review plan; current tasks and practice; and regulatory assessment and research programs

  7. Radiological impact on the surrounding area of Cernavoda NPP operation

    International Nuclear Information System (INIS)

    Busnita, M.; Penescu, M.; Neacsu, L.; Ion, M.; Moldoveanu, E.

    1996-01-01

    The objective of this paper is to present the protective measures provided to Cernavoda NPP for population and environment in case of normal operation and accidental situations. The paper describes the nuclear safety concept with the two aspects, the technical safety and the radiation protection, respectively, which represent the theoretical basis of the NPP design, construction and operation. The assessment of the potential radiological effects of Cernavoda NPP operation on the population and other environmental factors have been done by using the following input data: the natural and social characteristics of the site and the technical characteristics of the plant. The effects of Cernavoda NPP operation are also exposed in health risks which are compared with the daily risks of the population exposed of the natural phenomena or to the activities like transportation, domestics or industrial. (author). 1 tab., 6 refs

  8. Introduction of the SAT based training programs at Paks NPP

    International Nuclear Information System (INIS)

    Kiss, I.

    1998-01-01

    An introduction of the SAT based training programs at Paks nuclear power plant is described in detail, including framework of project operation; project implementation; process of SAT applied at Paks NPP and the needs of its introduction

  9. Preparation of Long Term Operation in Dukovany NPP, Czech Republic

    International Nuclear Information System (INIS)

    Krivanek, R.; Sabata, M.

    2012-01-01

    Dukovany NPP in the south-east of the Czech Republic operates four VVER 440/213 type units. The first unit was commissioned in 1985 and the last one in 1987. The operational results of the whole NPP have been excellent and NPP permanently belongs between the first quartile of the best operated NPPs in the world in accordance with WANO factors. Large safety improvement programme have been implemented in last 15 years. The original design lifetime of main components is 30 years which means till 2015 and it is understandable that NPP is preparing for long-term operation (LTO). The paper is describing activities carried out and planned for safe and successful LTO. (author)

  10. NPP Mochovce units 1 and 2 diagnostic systems

    International Nuclear Information System (INIS)

    Heidenreich, S.

    1997-01-01

    In this paper the diagnostic systems (leak detection monitoring, vibration monitoring, lose parts monitoring, fatigue monitoring) of NPP Mochovce units 1 and 2 are presented. All of the designed diagnostic systems are personal computer based systems

  11. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the Human Appropriation of Net Primary Productivity (HANPP) Collection maps the net amount of solar...

  12. HANPP Collection: Global Patterns in Net Primary Productivity (NPP)

    Data.gov (United States)

    National Aeronautics and Space Administration — The Global Patterns in Net Primary Productivity (NPP) portion of the HANPP Collection maps the net amount of solar energy converted to plant organic matter through...

  13. Computerized systems of NPP operators support. (Psychological problems)

    International Nuclear Information System (INIS)

    Mashin, V.A.

    1995-01-01

    Operator psychological problems arising in the work with NPP operators support computerized systems (OSCS) are considered. The conclusion is made that the OSCS intellectual application will bring the operator into dangerous dependence on his computerized assistant. To avoid this danger it is necessary by creation of the OSCS to divide specially the tasks areas of the operator and OSCS in order to assure the active role of the operator in the NPP control

  14. Studying the sampling representativeness in the NPP ventilation ducts

    International Nuclear Information System (INIS)

    Sosnovskij, R.I.; Fedchenko, T.K.; Minin, S.A.

    2000-01-01

    Measurements of the gas and aerosol voluminous activity in the NPP ventilation ducts are an important source of information on the radiation contaminants ingress into the environmental medium. These measurements include sampling, samples transport and proper measurements. The work is devoted to calculation of metrological characteristics of the sampling systems for the NPP gas-aerosol releases by different parameters of these systems and ventilation ducts. The results obtained are intended for application by designing such systems and their metrological certification [ru

  15. The psychological background about human error and safety in NPP

    International Nuclear Information System (INIS)

    Zhang Li

    1992-01-01

    A human error is one of the factors which cause an accident in NPP. The in-situ psychological background plays an important role in inducing it. The author analyzes the structure of one's psychological background when one is at work, and gives a few examples of typical psychological background resulting in human errors. Finally it points out that the fundamental way to eliminate the unfavourable psychological background of safety production is to establish the safety culture in NPP along with its characteristics

  16. Quantitative analysis of psychological personality for NPP operators

    International Nuclear Information System (INIS)

    Gao Jia; Huang Xiangrui

    1998-01-01

    The author introduces the relevant personality quantitative psychological research work carried out by 'Prognoz' Laboratory and Taiwan, and presents the primary results of the research for Chinese Nuclear Power Plant (NPP) operator's psychological personality assessment, which based on the survey of MMPI, and presents the main contents for the personality quantitative psychological research in NPP of China. And emphasizes the need to carry out psychological selection and training in nuclear industry

  17. Framatome Contribution to Chinese NPP Development and Standardization

    International Nuclear Information System (INIS)

    Charbonneau, S.

    1996-01-01

    First discussions in 1978 between Framatome and Chinese authorities about the supply of an NPP were successfully concluded in 1986 by the signature of the supply contracts (nuclear islands, conventional islands, nuclear fuel assemblies, and project management assistance) for the Daya Bay NPP. Since then teams of engineers and technicians from Framatome and other French companies, and from relevant Chinese institutes and agencies have gotten to know each other better and have deepened their relationships

  18. Assessment of financial expenditure for Rivne NPP power units decommissioning

    International Nuclear Information System (INIS)

    Nosovskij, A.V.; Salij, L.M.

    2007-01-01

    The article covers some financial aspects of developing a decommissioning concept for Rivne NPP power units with reactor VVER-440 and VVER-1000. Possible methodological approaches to costs estimate have been analyzed. Preliminary results of cost estimation are presented for two decommissioning options: deferred and immediate dismantling. Principally possible options for accumulating assets have been analyzed to finance measures related to Rivne NPP decommissioning. A mathematical model has been proposed for creating decommissioning financial reserve

  19. The main trends of work on lifetime management of NPP

    International Nuclear Information System (INIS)

    Dragunov, Yu.; Kurakov, Yu.

    1995-01-01

    The major trends of works on NPP lifetime management are discussed: Co-ordinating and organizational activities; studying the degradation processes and residual life; elaboration and implementation of the measures to maintain/enhance safety level of NPPs operating within design life; development of control principals of advanced NPPs aging and safe life; creation and development of regulations in the field of NPP aging and life management. 7 figs

  20. Morbidity with temporary disability in Kozloduy NPP workers

    International Nuclear Information System (INIS)

    Dobreva, B.; Novkirishki, V.

    1993-01-01

    Changes with time in indicators of disease incidence with temporary disability in Kozloduy NPP personnel have been studied for the period 1974-1991. The data were compared with those for 'Sofia-Iztok' TPP. The causes contributing to formation of the indicators of frequency, severity, and average duration were examined. No temporary disability because of radiation exposure has been recorded. As a whole, less temporary disability has been found at NPP than at TPP. (author)

  1. Tritium monitoring at NPP and enviromental area under survey

    International Nuclear Information System (INIS)

    Nurislamov, I.R.; Kham'yanov, L.P.; Panichkin, V.F.

    1983-01-01

    Methods and devices for tritium monitoring at NPP with the WWER-type reactors and the environment are described. Aqueous solutions of inorganic and organic compounds, water vapours in the air of NPP rooms and the environment atmosphere, free and bound water in soils and vegetation were the objects for monitoring. Methods of tritium sampling from the atmosphere as well as determination of its content in samples are presented. Special attention is paid to sample enrichment with tritium

  2. Hydrodynamics and sediment transport at Muria Peninsula NPP Site

    International Nuclear Information System (INIS)

    Heni Susiati; Berni A Subki; Harman A

    2011-01-01

    Coastal along the coast of the Muria Peninsula, particularly the location of the Muria NPP site candidate is a dynamic region, the interaction between physical oceanographic factors such as currents, waves and tides in the coastal sediments cause abrasion or accretion. Interactions have resulted in coastal dynamics needs to be considered in siting NPP is essential in order to plan. Capacity of hydro-oceanographic data is essential in order to plan the development of the Muria NPP. The process of selecting a safe site for hydro-oceanographic aspects carried out according to IAEA safety standards on site selection. For the evaluation stage of hydro oceanographic potential site (site survey stage), the analysis is more focused on the tidal along the northern coast, bathymetry, potential water resources and hydrologic systems in the Muria NPP siting locations, Jepara. The method used is a secondary, confirmation of field data collection and interpretation of modeling results. The results showed that the preparation for the construction of NPP need to be evaluated further to coastal conditions with respect to the increase coastal erosion in the area of prospective NPP siting. (author)

  3. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  4. Public opinion concerning completion of Khmelnitsky-2 and Rovno-4 NPP's construction for compensation of Chernobyl NPP shut-down

    International Nuclear Information System (INIS)

    Litvins'kij, L.L.; Novos'olov, G.M.; Majstrenko, O.V.; Sazonov, G.V.; Gryin, L.

    2001-01-01

    Interrogation of representation from non-government organizations and private persons from 46 countries about their opinion on completion of two NPP's construction revealed many comments about environmental effects, safety and economic aspects. These comments are analyzed by specialists

  5. Role of PRA in new NPP projects

    International Nuclear Information System (INIS)

    Julin, A.; Sandberg, J.; Virolainen, R.

    2012-01-01

    In Finland, a plant specific, Level 1 and 2 Probabilistic Risk Analysis (PRA) is required as a prerequisite for issuing the construction license and operating license. The use of PRA in various applications and the main insights are presented. These applications include e.g. PRA support to the design of SSCs (Systems, Structures and Components), definition of pre-service and in-service inspection programs, evaluation of the safety classification of SSCs, development of procedures, training and in definition of risk informed technical specifications, periodic testing and on-line preventive maintenance programs. In addition, PRA shall be used to assess the adequacy and coverage of the phase and system commissioning programs. Also the potential risks related to commissioning tests during nuclear test phase, shall be assessed with the help of PRA. In OL3 project, risk informed approach has been applied on a large scale for the first time in the design, construction and commissioning of a new NPP unit. Pre-nuclear commissioning tests have started at OL3 site and the plant is foreseen to begin commercial operation in 2013. Decisions have been made to launch new NPP projects. Teollisuuden Voima Oyj (TVO) is planning to build a new unit (OL4) at Olkiluoto site and a new utility, Fennovoima, is planning to build one unit at one of two alternative green field sites in Northern parts of Finland. Insights from PRAs of operating NPPs have been used in the evaluation of possible new sites to ensure that the site specific concerns and environmental conditions are adequately taken into account in the design of SSCs. Although the seismic activity at the Olkiluoto site is low, a comprehensive seismic risk analysis is being conducted. Its results support the review of the deterministic seismic design. For new sites, a probabilistic seismic hazard analysis has been carried out for the determination of the design earthquake. Experiences from OL3 licensing have been utilized in the

  6. EPC projects for EPR Flamanville 3 NPP

    International Nuclear Information System (INIS)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B.

    2010-01-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  7. EPC projects for EPR Flamanville 3 NPP

    Energy Technology Data Exchange (ETDEWEB)

    Diaz, J.I.; Polo, J.; Aymerich, E.; Cubian, B. [Nuclear Generation Department, Iberdrola Ingenieria y Construccion, Avda. Manoteras 20, 28050 Madrid (Spain)

    2010-07-01

    IBERDROLA Ingenieria y Construccion is carrying out a handful of activities in the EPR Flamanville 3 -FA3 NPP- context since 2007 matching oriented to position the company in the emerging marketplace of new nuclear power plants Generation III+, whose expectation for the next years is highly promising. IBERDROLA Ingenieria y Construccion leads 5 EPC -Engineering, Procurement and Commissioning- projects for FA3 NPP from the Nuclear Island till Sea Water Pumping Station as follows: - Design, procurement. fabrication, installation and testing of 21 shell and tubes heat-exchangers for the nuclear island. 12 out of these 17 HXs are conventional and will be designed according to ASME BPV code Section VIII and have to comply with PED 97/23/CE and ESPN. The remaining 5 HXs are nuclear and will be designed according to ASME BPV code Section III and have also to comply with PED and ESPN. - Design, procurement, fabrication and assembly of 9 demineralizers for different plant systems. Three of these Important To Safety (IPS) equipments have been manufactured according with ASME VIII codes and six of them with EN 13445 code plus additional requirements to comply with PED and final client requirements for nuclear island. - Design, fabrication and installation of qualified travelling water screening filters. The equipments furnished will be two nuclear safety qualified filters and associated equipment (cleaning water system and control system). Additionally some auxiliary devices such as grids, automatic trash rakes and stop gates are included in the contract. - Engineering, procurement, fabrication, erection and commissioning for the condensate treatment plant. This system includes a demineralizer tank, 5 filters, reactive injection mixer, pneumatic and manual valves, piping and instrumentation and control systems. - Engineering, procurement erection and commissioning for the electro-chlorination plant to protect the IPS piping for Condensate Water System for FA3. This system

  8. Barsebaeck NPP in Sweden - Decommissioning Project

    International Nuclear Information System (INIS)

    Hakan, Lorentz

    2009-01-01

    Barsebaeck 1 and 2, type BWR (Boiling Water Reactor) with a capacity of 615 MWe was closed down permanently on 30 November 1999 respective 31 May 2005 due to political decision. Both units together have been in Service operation (Care and maintenance) since 1 December 2006. Barsebaeck NPP will stay in Service operation until beginning of 2018 when Dismantling operation begins with the aim of a free-realized site in the beginning of 2025. That means that the remaining buildings, including equipment should be declared free-released or dismantled. It would then be up to the owner, E.ON Kaernkraft Sverige AB (EKS) to decide what is to be done with the site in the future. There was a re-organisation at Barsebaeck Kraft AB (BKAB) in 1 January 2007 and the company is organised in the following areas of function: site service operation, decommissioning planning, new business and BO replacement. The Organisation at BKAB has gone down from 450 during operation of Barsebaeck 1 and 2 to 50 employees (2009-01-01) involved in Service operation of both units. But still there are in total 250 persons placed at Barsebaeck NPP with different kinds of job assignments. A lot of activities have been carried out since 2000 and up to now for example: - All nuclear fuel has been transported away to interim storage at CLAB in Oskarshamn. - BKAB have built up contact nets and competence by taking part in different kinds of national and international organisations (SKB, IAEA, OECD/NEA TAG, WNA, ENISS, WANO, EPRI etc) commissions. - The Electrical and operational systems have been rebuilt for the actual demands and requirements for the Service operation. - The central control room is unattended since 17 December 2007 and the supervision of the Service operation is handled by a system of VDI (duty engineers) and LOP (alarm operators). - Full system decontamination on unit 1 and 2. Barsebaeck's approach today and for the future dismantling are: - Safer; - Faster; - Cost effective. BKAB

  9. Radiation protection in Bohunice NPP. Description of present status

    International Nuclear Information System (INIS)

    Dobis, L.

    2001-01-01

    Radiation protection (RP) at Bohunice NPP has reached the high international standard. The fact was approved by several independent international missions (OSART , WANO, WENRA, ...). A lot of modifications have been done in order to improve the standard of radiation protection. All the BSS requirements have been implemented into the plant regulations before the State Law No 290/1996 and 470/2000 came into the force. Internal audits are regularly performed at NPP in order to reveal potential deficiencies. In 2001 there were 4 such audits focused on quality assurance, software operation, LBB concept and limits and condition of safe operation. State Health Institute, the regulatory body in the radiation protection, performs the inspection at least ones a month. Good relationship with the inspectors of State Health Institute also contributes to the safe operation of the NPP. There were not any radiation accident. All anomalies or radiation events are investigated at a plant level. The results of root cause analysis and proposal of corrective actions are provided to IAEA and WANO databases for the distribution. The Radiation protection department of Bohunice NPP cooperates with the other Czech and Slovak NPPs. Regular meetings on radiation protection and lately also on emergency preparedness are organized. The cooperation is excellent. Occupational exposure is reviewed also with respect of ISOE data. Bohunice NPP (even with high dose burden caused by reconstruction of V1 NPP) can be found in the first half of world PWR speaking about the collective exposure per reactor. V2 NPP itself reaches the lowest collective exposure in the world. All doses are below the limits and kept ALARA. ALARA system has been established already in 1997 at Bohunice NPP and its results are obvious for example looking at dose results during the reconstruction works at V1 NPP. The operation of Bohunice NPP has negligible influence to its surroundings. The values of gas and liquid effluents move

  10. Ukrainian Nuclear Society International Conference 'Modernization of the NPP with VVER reactor' (abstracts)

    International Nuclear Information System (INIS)

    Bar'yakhtar, V.G.

    1999-01-01

    Abstracts of the papers presented at International conference of the Ukrainian Nuclear Society 'Modernization of the NPP with VVER reactor'. The following problems are considered: improving the NPP's safety and reliability; reactor modernization, the lifetime prolongation; increasing of the reactor operating characteristics; methods of capacity factor increasing: refueling control, maintenance control; technical and economical aspects of NPP modernization; modernization of the automated control system of the fuel process at the NPP's; technical features and methods for the continued radiation and technology control at the NPP's; training, increasing the staff qualification and NPP modernization

  11. Network scheduling at Belene NPP construction site

    International Nuclear Information System (INIS)

    Matveev, A.

    2010-01-01

    Four types of schedules differing in the level of their detail are singled out to enhance the efficiency of Belene NPP Project implementation planning and monitoring: Level 1 Schedule–Summary Integrated Overall Time Schedule (SIOTS) is an appendix to EPC Contract. The main purpose of SIOTS is the large scale presentation of the current information on the Project implementation. Level 2 Schedule–Integrated Overall Time Schedule (IOTS)is the contract schedule for the Contractor (ASE JSC) and their subcontractors.The principal purpose of IOTS is the work progress planning and monitoring, the analysis of the effect of activities implementation upon the progress of the Project as a whole. IOTS is the reporting schedule at the Employer –Contractor level. Level 3 Schedules, Detail Time Schedules(DTS) are developed by those who actually perform the work and are agreed upon with Atomstroyexport JSC.The main purpose of DTS is the detail planning of Atomstroyexport subcontractor's activities. DTSare the reporting schedules at the level of Contractor-Subcontractor. Level 4 Schedules are the High Detail Time Schedules (HDTS), which are the day-to-day plans of work implementation and are developed, as a rule, for a week's time period.Each lower level time schedule details the activities of the higher level time schedule

  12. NPP lifetime philosophy: the transatlantic difference

    International Nuclear Information System (INIS)

    Mowry, Christofer

    1998-01-01

    Fundamental institutional and cultural differences in the transatlantic nuclear power industries, and in particular those between the Nordic countries and the United States, have driven divergent plant life management strategies -strategies resulting in distinctly different plant performance. Recognition of the linkage between three key components of overall Nuclear Power Plant (NPP) performance - yearly O and M costs, safety, and effective plant lifetime -is based on different institutional perspectives. In the Nordic countries, explicit recognition of this linkage has been historically translated into an integrated approach to plant performance. American NPPs, however, have been forced to focus primarily on near term O and M performance and regulatory mandated investment. While Nordic NPPs view capital investment in plant lifetime management and modernization as necessary to avoid declining plant performance and the cost of replacement power, American NPPs exhibit reluctance for such investments due to the difficulty of justifying the associated short-term costs. The diverging histories of two NPPs of the same vintage and design, one in Sweden and one in the United States, exemplify the potential ramifications of these approaches. The Swedish plant continues to operate with excellent performance indicators, while undertaking a comprehensive and long-term modernization program. The American facility is likely to be decommissioned due to unsustainable economic performance. (author)

  13. On-line maintenance at Cofrentes NPP

    International Nuclear Information System (INIS)

    Roldan Vilches, J.; Moreno Matarranz, M. A.; Hermana Mendioroz, I.

    1998-01-01

    Cofrentes NPP has begun in 1997 activities related to At Power Preventive Maintenance over trains or systems which lead to a voluntary entry in a Limitative Condition of Operation (LCO) of the Technical Specifications. From others benefits, this program ha improved the risk management and the staff's knowledge over the functions and safety implications of the different systems, the better exploit of the resources, the co-ordination of the different organisations involved (Maintenance an Operation) and the reductions of works during shutdowns. Previous to each work, a feasibility study analyzes qualitative and quantitative (PSA), using the Risk Monitor, the implications on safety of all the tasks, assuring that the global safety of the Plant is always maintained. Tech. Spec. are analyzed in detail and also are analyzed situations of simultaneous unavailabilities of systems which could lead to a high risk situation. Two different risk controls are defined (punctual and accumulated) to assure that high risk situations will not be given. Finally, historical risk profile is analyzed to assure that the accumulated risk increase is not significant. Risk Monitor helps staff in the schedule and follow-up of the activities of On-Line Maintenance. Each one of the tasks are deeply planned and harshly analyzed and are carried out by high qualified workers. By the moment, this program is running with fully satisfaction on the Plant. (Author)

  14. SAT for NPP personnel training in Spain

    International Nuclear Information System (INIS)

    Gonzalez, M.

    1995-01-01

    The SAT process objectives as applied to Spanish NPPs are: Perform JTA for selected job positions at the NPPs; develop the associated training plans; develop training support media; prepare training instructors as teachers and as task analysts; develop a SAT database. A lesson-learned from the task assessments conducted at Spanish NPPs is that the final task list should be obtained with full participation of workers so that they feel the final training plan has been developed taking into account their own opinion and experience. The breakdown of the tasks into its elements and the concordant job performance measure was presented. The process of determining knowledge and skills associated with the task elements and the structure and use of the taxonomy codes (for component, system, and academic skills and knowledge) was shown and explained. Based on the Spanish experience, the average time devoted to analyze a complete task is 5.33 person-hours per task. This data has permitted training and plant management to allocate the NPP human resources to support the analysis phase of SAT (which can be very time-consuming)

  15. Nuclear fuel utilization at the Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Boyadzhiev, Z [Kombinat Atomna Energetika, Kozloduj (Bulgaria); Kharalampieva, Ts; Pejchinov, Ts

    1996-12-31

    Data on core loading and operation conditions during past fuel cycles of the Units 1 to 6 at the Kozloduy NPP are presented. The Units 1 and 2 have reached average discharge fuel burn-up of 31 MW d/kg U, the Unit 3 - 34 MW d/kg U and the Unit 4 - 36.5 MW d/kg U. By use of dummies and low-leakage core loading patterns for WWER-440 cores an effective reduction in reactor pressure vessel irradiation is obtained. By increasing the enrichment level and improving the characteristics of the Units 3 and 4, a design fuel cycles duration has been reduced by 5-10% in number of assemblies. Core loading design has been modelled using computer codes SPPS-1, BIPR-7, ALBOM, PROROC. A 3-year fuel cycle utilizing 4.4% enriched fuel proved to be more efficient for WWER-1000 by 15% reduction in fuel cost compared to the 2-year cycle. Future developments include improvements of the in-core monitoring system and process on-line simulation based on more accurate computer codes. 7 refs., 6 figs., 10 tabs.

  16. Shutdown chemistry optimization at Maanshan NPP

    International Nuclear Information System (INIS)

    Sun Yuanlung; Chuang Benjamin; Su Kouhwa; Kao Jueiting

    2009-01-01

    At Maanshan PWRs, a significant piping radiation buildup caused by crud burst from fuel surface in the beginning of RFO used to be blamed as a contribution to high personal exposures during outage. Therefore, several modifications on shutdown chemistry procedures such as, early lithium removal, rapid boration, dissolved hydrogen removal, extended RCP operation, and maintaining maximum let down flow, have been consecutively conducted since no.1RFO-16, 2006. The important operational and chemical parameters of modified shutdown chemistry procedures adopted in no.2 RFO-17, 2008 and superiority in low reading (2 mSv/hr) from let down heat exchangers area radiation monitor over 11mSv/hr of no.1 RFO-16 at the same area will be addressed in this paper. At the end of no.2 RFO-17, low personal exposures of 765 man-mSv (TLD)verified the absence of crud burst during shutdown chemistry process and broke records of Maanshan NPP as well. Even with a new job on PZR pre-emptive dissimilar weld overlay which exhausting 17.37% of total 797 man-mSv(TLD) in the latest no.1 RFO-18, 659 man-mSv (TLD) made another record low in the history of Maanshan. (author)

  17. Training needs analysis at Cernavoda NPP - Romania

    International Nuclear Information System (INIS)

    Georgescu, L.M.

    2002-01-01

    The paper is mainly on training needs analysis applied at Cernavoda NPP and will outline the Cernavoda (CNPP) approach in establishing what kind of training is necessary for CNPP employees, from the moment they are hired until they become qualified. The training methodology adapted at CNPP is one which adheres to the principles of the Systematic Approach to Training (SAT). SAT adoption at CNPP provides a broad integrated approach emphasizing not only technical knowledge and skills but also human factors knowledge, skills and attitudes. The analysis of SAT at CNPP consists of a 'table-top' analysis of training and qualification requirements. This paper will illustrate how a 'table-top' analysis by Subject Matter Experts is organized, carried out and recorded, and which categories of staff have begun this table-top analysis at CNPP. It will also give an example how this analysis is done: how the tasks of each job are rated, which are the used criteria, and how to proceed with the incorporation of the tasks into initial and continuing training, as appropriate. (author)

  18. Intranet portal at the Krsko NPP, Slovenia

    International Nuclear Information System (INIS)

    2016-01-01

    The intranet portal (named IntraNEK) at Krsko NPP serves as a single entry point to access the internet and various plant applications and links. The front page consists of the standard internet search bar and links to various applications that can either reside within the technological computer network (TRM) or within the plant business computer network. Access to the TRM applications is read only. Some applications on the business computer network are open to all personnel who log on to the network while some applications are restricted and secured, and require additional login entries. A selected link will open in a new window. Documents will open with the appropriate software tool depending on the document file format. Some categories of documents are available in image form only (e.g. procedures, drawings etc.), while some are available in fully searchable PDF format (e.g. technical specifications, updated safety analysis reports (USARs) etc.). Plant departments (organizational units) have their own pages accessible from the front page. Their pages contain links to their own information resources or links to other resources and applications, tailored to the department needs. During recent years a number of web based applications have been developed that are connected also with a common Oracle database. Some are designed to serve for data entry and browsing while others serve for browsing only

  19. Economic aspects of Dukovany NPP fuel cycle

    International Nuclear Information System (INIS)

    Vesely, P.; Borovicka, M.

    2001-01-01

    The paper discusses some aspects of high burnup program implementation at Dukovany NPP and its influence on the fuel cycle costs. Dukovany internal fuel cycle is originally designed as a three years cycle of the Out-In-In fuel reloading patterns. These reloads are not only uneconomical but they additionally increased the radiation load of the reactor pressure vessel due to high neutron leakage typical for Out-In-In loading pattern. To avoid the high neutron leakage from the core a transition to 4-year fuel cycle is started in 1987. The neutron leakage from the core is sequentially decreased by insertion of older fuel assemblies at the core periphery. Other developments in fuel cycle are: 1) increasing of enrichment in control assemblies (3.6% of U-235); 2) improvement in fuel assembly design (reduce the assembly shroud thickness from 2.1 to 1.6 mm); 3) introduction of Zr spacer grid instead of stainless steel; 4) introduction of new type of assembly with profiled enrichment with average value of 3.82%. Due to increased reactivity of the new assemblies the transition to the partial 5-year fuel cycle is required. Typical fuel loading pattern for 3, 3.5, 4 and 5-year cycles are shown in the presented paper. An evaluation of fuel cost is also discussed by using comparative analysis of different fuel cycle options. The analysis shows that introduction of the high burnup program has decrease relative fuel cycle costs

  20. NPP Krsko simulator training for operations personnel

    International Nuclear Information System (INIS)

    Pribozic, F.; Krajnc, J.

    2000-01-01

    Acquisition of a full scope replica simulator represents an important achievement for Nuclear power Plant Krsko. Operating nuclear power plant systems is definitely a set of demanding and complex tasks. The most important element in the goal of assuring capabilities for handling such tasks is efficient training of operations personnel who manipulate controls in the main control room. Use of a simulator during the training process is essential and can not be substituted by other techniques. This article gives an overview of NPP Krsko licensed personnel training historical background, current experience and plans for future training activities. Reactor operator initial training lasts approximately two and a half years. Training is divided into several phases, consisting of theoretical and practical segments, including simulator training. In the past, simulator initial training and annual simulator retraining was contracted, thus operators were trained on non-specific full scope simulators. Use of our own plant specific simulator and associated infrastructure will have a significant effect on the operations personnel training process and, in addition, will also support secondary uses, with the common goal to improve safe and reliable plant operation. A regular annual retraining program has successfully started. Use of the plant specific simulator assures consistent training and good management oversight, enhances conformity of operational practices and supports optimization of operating procedures. (author)

  1. Structural analysis of NPP components and structures

    International Nuclear Information System (INIS)

    Saarenheimo, A.; Keinaenen, H.; Talja, H.

    1998-01-01

    Capabilities for effective structural integrity assessment have been created and extended in several important cases. In the paper presented applications deal with pressurised thermal shock loading, PTS, and severe dynamic loading cases of containment, reinforced concrete structures and piping components. Hydrogen combustion within the containment is considered in some severe accident scenarios. Can a steel containment withstand the postulated hydrogen detonation loads and still maintain its integrity? This is the topic of Chapter 2. The following Chapter 3 deals with a reinforced concrete floor subjected to jet impingement caused by a postulated rupture of a near-by high-energy pipe and Chapter 4 deals with dynamic loading resistance of the pipe lines under postulated pressure transients due to water hammer. The reliability of the structural integrity analysing methods and capabilities which have been developed for application in NPP component assessment, shall be evaluated and verified. The resources available within the RATU2 programme alone cannot allow performing of the large scale experiments needed for that purpose. Thus, the verification of the PTS analysis capabilities has been conducted by participation in international co-operative programmes. Participation to the European Network for Evaluating Steel Components (NESC) is the topic of a parallel paper in this symposium. The results obtained in two other international programmes are summarised in Chapters 5 and 6 of this paper, where PTS tests with a model vessel and benchmark assessment of a RPV nozzle integrity are described. (author)

  2. Instrumentation database specific to Trillo I NPP

    International Nuclear Information System (INIS)

    Pereira Pagan, M.B.; Saenz de Tejada, P.; Fernandez Alvarez, A.; Haya, J.

    1997-01-01

    The analysis of data on electronic instrumentation components in the Trillo I PSA has involved and extra effort, basically due to the particular characteristics of these equipment items. This analysis has different aspects depending on the type of information used: Components whose data have been obtained from generic information sources (with or without Bayesian processing). Components whose data have been obtained from specific German studies (TUV) Components whose data have been based directly on the historical experience of Trillo I NPP Components whose data have been based on miscellaneous generic and specific sources This information can also be classified into: Micro components formed by a single module ar card Micro components: formed by set of instrumentation elements It can be further subdivided according to the operating conditions of the components: Equipment whose operation depends on the functions they perform in a particular system (eg. reactor protection system instrumentation channels) Equipment whose operation is not associated with particular conditions (eg. modules for motor-operated equipment). (Author)

  3. Nuclear fuel utilization in Kozloduy NPP

    Energy Technology Data Exchange (ETDEWEB)

    Boyadzhiev, Z; Kharalampieva, Ts; Pejchinov, Ts [Kombinat Atomna Energetika, Kozloduj (Bulgaria)

    1994-12-31

    An assessment of fuel utilization in Kozloduy NPP units 1-6 is made on the basis of operational data obtained for a total of 62 fuel cycles. Basic characteristics of core loading and operation conditions are given. SPPS-1 and BIPR-7 codes are used to calculate assembly-wise power distributions for different full power days of a given cycle and unit. The data are compared with the measured values of these quantities. The analysis performed shows that the core loading option chosen has led to efficient fuel utilization without violation of the nuclear safety criteria. For WWER-440 (Units 1 - 4) this is expressed in effective reduction of the reactor vessel irradiation, maintaining the design duration of the fuel cycles at a reduced number of assemblies by a factor 5 - 5-10%, utilizing fuel with higher enrichment and implementing the 4-year fuel cycle. For WWER-1000 the improvements lead to: adoption of the 3-year fuel cycle utilizing fuel with 4.4% initial enrichment, implementation of improved fuel with a new type of absorbers and more effective low-leakage core loading patterns. 10 tabs., 6 figs., 7 refs.

  4. Current technological trends in development of NPP systems

    International Nuclear Information System (INIS)

    Florescu, Gheorghe; Panaitescu, Valeriu

    2010-01-01

    The recent nuclear research issues look for new technologies and continuous progress in finding different and efficient solutions for sustained and upraising energy demand. The trend of increasing energy consumption and occurring of new and large consumers, especially from Asian countries, imposes finding of new means for clean, large scale and sustained energy production. NPPs availability was continuously monitored and improved; at the same time the safety of the nuclear energy production was under surveillance. The present development of the new technologies, the discoveries of new materials and development of efficient technological processes offer the opportunities for their appropriate implementation and use in the NPP system configurations and functioning/operation. The new technologies and scientific discoveries, and also the international cooperation, offer the opportunities to mitigate the actual barriers in order to cumulate and use advanced energy production, to find new energy sources and to build improved, reliable and safe power plants. The monitoring systems, intelligent sensors and SSCs, nanotechnologies and new/intelligent materials constitute the main ways for improvement of the NPP systems configuration and processes. The paper presents: - The state of the art in the level of the currently applied technologies for nuclear power systems development; - The actual technological limits that need to be over passed for improving the NPP systems ; - The main systems that need improvement and reconfiguration for development of currently operating NPPs as well as raising the operation efficiency, availability and total safety; - The actual energy production issues; - The key arguments in sustaining the R and D new NPP systems development; - Future trends in NPP development; - The limitations in industrial processes knowledge and use. Appropriate R and D in the field of NPP systems have specific characteristics that were considered in paper completion

  5. A comparison of the Kozloduy NPP and Temelin NPP I and C projects

    International Nuclear Information System (INIS)

    Cook, B.M.

    2004-01-01

    Because Kozloduy NPP and Temelin NPP are both VVER 1000 plants of roughly the same vintage, they are very similar in design. However, from the viewpoint of their I and C modernization projects, there are significant differences between these plants. Some of these differences stem from the evolution of I and C technology over the relatively short period between the two projects. Other differences arise from the fact that the Kozloduy project is a phased upgrade of the I and C systems in an operating plant while the Temelin project was a 'one time' installation of the entire plant I and C system. This paper discusses these differences as well as trends in the nuclear I and C field that will shape the industry in the future. In addition to technology evolution, the comparative advantages or problems in phased upgrade versus 'one time' installations are discussed. Conclusions drawn provide insight for the planning of future I and C upgrades in VVERs and other types of nuclear power plants. (author)

  6. Equipment reliability improvement process; implementation in Almaraz NPP and Trillo NPP

    International Nuclear Information System (INIS)

    Risquez Bailon, Aranzazu; Gutierrez Fernandez, Eduardo

    2010-01-01

    The Equipment Reliability Improvement Process (INPO AP-913) is a non-regulatory process developed by the US Nuclear Industry for improving Plants Availability. This Process integrates and coordinates a broad range of equipment reliability activities into one process, performed by the Plant in a non-centralized way. The integration and coordination of these activities will allow plant personnel to evaluate the trends of important station equipment, develop and implement long-term equipment health plans, monitor equipment performance and condition, and make adjustments to preventive maintenance tasks and frequencies based on equipment operating experience, if necessary, arbitrating operational and design improvements, to reach a Failure-free Operation. This paper describes the methodology of Equipment Reliability Improvement Process, being focused on main aspects of the implementation process, relating to the scope and establishment of an Equipment Reliability Monitoring Plan, which should include and complement the existing mechanisms and organizations in the Plant to monitor the condition and performance of the equipments, with the common aim of achieving an operation free of failures. The paper will describe the tools that Iberdrola Ingenieria has developed to support the implementation and monitoring of the Equipment Reliability Improvement Process, as well as the results and lessons learned from its implementation in Almaraz NPP and Trillo NPP. (authors)

  7. Spent fuel pool risk analysis for the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Hust' ak, S.; Jaros, M.; Kubicek, J. [UJV Rez, a.s., Husinec-Rez (Czech Republic)

    2013-07-01

    UJV Rez, a.s. maintains a Living Probabilistic Safety Assessment (Living PSA) program for Dukovany Nuclear Power Plant (NPP) in the Czech Republic. This project has been established as a framework for activities related to risk assessment and to support for risk-informed decision making at this plant. The most extensively used PSA application at Dukovany NPP is risk monitoring of instantaneous (point-in-time) risk during plant operation, especially for the purpose of configuration risk management during plant scheduled outages to avoid risk significant configurations. The scope of PSA for Dukovany NPP includes also determination of a risk contribution from spent fuel pool (SFP) operation to provide recommendations for the prevention and mitigation of SFP accidents and to be applicable for configuration risk management. This paper describes the analysis of internal initiating events (IEs) in PSA for Dukovany NPP, which can contribute to the risk from SFP operation. The analysis of those IEs was done more thoroughly in the PSA for Dukovany NPP in order to be used in instantaneous risk monitoring. (orig.)

  8. Technical innovations at NPP Dukovany - for safe and efficient operation

    International Nuclear Information System (INIS)

    Sabata, M.; Vasa, I.

    2000-01-01

    Inherent features of the NPP Dukovany design provide a significant confidence in its nuclear safety assurance; among these features should be emphasised the reactor core stability and its control and protection system capability to hold the reactor in safe state following scram or accident conditions. Nevertheless, NPP Dukovany was designed in the early seventies, and current requirements for nuclear safety assurance are more strict and/or specific as a result of the technical development and lessons learned from nuclear accidents. The paper compares the safety design base established at the time of NPP Dukovany project implementation and the current reference design base. The paper also presents procedures applied to implement technical and operational measures which are introduced to fulfil the current basic safety criteria. The scope of such measures applied at NPP Dukovany is compared with that of EU countries introduced for the same reason - to meet the updated safety related requirements. Examples of some innovations already implemented or under implementation give an idea how NPP Dukovany proceeds in reaching the goal of harmonising its safety with the requirements to be met before the Czech Republic becomes a member country of the European Union. (author)

  9. New appraisement of siting for a NPP on Mures river

    International Nuclear Information System (INIS)

    Traian Mauna

    2010-01-01

    The studies for a second NPP siting on inner Romanian rivers began in a careful manner since 1982 as a first part of the Nuclear Power Plant Romanian Program adopted by political and governmental authorities at the time. The experience gained from Cernavoda NPP siting, the first mission of new multi-branch of specialists team was to choose new NPP sites adapting the CANDU type NPP Cernavoda project to the new parameters of close water cooling circuit and of hard less or no rock foundation strata. The new sites conditions mean a lot of changes of CANDU license and a decrease the output power supplied to the national electric grid. The studies on the Mures river as alternative site of Olt river in Transylvania region began in 1986 and were stopped after 1990. This paper tries to reconsider shortly the old analysis focused on geological and geotechnical aspects and other local sites characteristics according to the last IAEA Safety Standards taking into account also the last types of NPP generations and the number of units. (author)

  10. Review of accident analyses performed at Mochovce NPP

    International Nuclear Information System (INIS)

    Siko, D.

    2000-01-01

    In this paper the review of accident analysis performed in NPP Mochovce V-1 is presented. The scope of these safety measures was defined and development in the T SSM for NPP Mochovce Nuclear Safety Improvements Report' issued in July 1995. The main objectives of these safety measures were the followings: (a) to establish the criteria for selection and classification of accidental events, as well as defining the list of initiating events to be analysed. Accident classification to the individual groups must be performed in accordance with RG 1.70 and IAEA recommendations 'Guidelines for Accidental Analysis of WWER NPP' (IAEA-EBR-WWER-01) to select boundary cases to be calculated from the scope of initiating events; (b ) to elaborate the accident analysis methodology that also includes acceptance criteria for their result evaluation, initial and boundary conditions, assumption related with the application of the single failure criteria, requirements on the analysis quality, used computer codes, as well as NPP models and input data for the accident analysis; (c) to perform the accident analysis for the Pre-operational Safety Report (POSAR); (d) to provide a synthetic report addressing the validity range of codes models and correlations, the assessment against relevant tests results, the evidence of the user qualification, the modernisation and nodding scheme for the plant and the justification of used computer codes. Analyses results showed that all acceptance criteria were met with satisfactory margin and design of the NPP Mochovce is accurate. (author)

  11. Feature extraction and sensor selection for NPP initiating event identification

    International Nuclear Information System (INIS)

    Lin, Ting-Han; Wu, Shun-Chi; Chen, Kuang-You; Chou, Hwai-Pwu

    2017-01-01

    Highlights: • A two-stage feature extraction scheme for NPP initiating event identification. • With stBP, interrelations among the sensors can be retained for identification. • With dSFS, sensors that are crucial for identification can be efficiently selected. • Efficacy of the scheme is illustrated with data from the Maanshan NPP simulator. - Abstract: Initiating event identification is essential in managing nuclear power plant (NPP) severe accidents. In this paper, a novel two-stage feature extraction scheme that incorporates the proposed sensor type-wise block projection (stBP) and deflatable sequential forward selection (dSFS) is used to elicit the discriminant information in the data obtained from various NPP sensors to facilitate event identification. With the stBP, the primal features can be extracted without eliminating the interrelations among the sensors of the same type. The extracted features are then subjected to a further dimensionality reduction by selecting the sensors that are most relevant to the events under consideration. This selection is not easy, and a combinatorial optimization technique is normally required. With the dSFS, an optimal sensor set can be found with less computational load. Moreover, its sensor deflation stage allows sensors in the preselected set to be iteratively refined to avoid being trapped into a local optimum. Results from detailed experiments containing data of 12 event categories and a total of 112 events generated with a Taiwan’s Maanshan NPP simulator are presented to illustrate the efficacy of the proposed scheme.

  12. 7 Vascular Hydrophytes for Bioassay.cdr

    African Journals Online (AJOL)

    Administrator

    4 water (see Table 1). tool. The greater extension growth of macrophyte shoots in water from downstream of STWs (Fig. 1) was supported by both chemical analysis, which showed increased phosphate concentration (Table 1), and by conventional Selenastrum bioassay in which higher cell concentrations were achieved.

  13. Ecological anatomy of some hydrophytes in Nigeria

    African Journals Online (AJOL)

    STORAGESEVER

    2009-07-20

    Jul 20, 2009 ... tissues and counter stained in Aniline Blue to increase contrast. Sections were viewed with microscope equipped with the ocular eye-piece at 100 x magnification. .... the relationship between anatomy, ecology and evolution.

  14. External Events PSA for the Paks NPP

    International Nuclear Information System (INIS)

    Bareith, Attila; Karsa, Zoltan; Siklossy, Tamas; Vida, Zoltan

    2014-01-01

    Initially, probabilistic safety assessment of external events was limited to the analysis of earthquakes for the Paks Nuclear Power Plant in Hungary. The level 1 seismic PSA was completed in 2002 showing a significant contribution of seismic failures to core damage risk. Although other external events of natural origin had previously been screened out from detailed plant PSA mostly on the basis of event frequencies, a review of recent experience on extreme weather phenomena made during the periodic safety review of the plant led to the initiation of PSA for external events other than earthquakes in 2009. In the meantime, the accident of the Fukushima Dai-ichi Nuclear Power Plant confirmed further the importance of such an analysis. The external event PSA for the Paks plant followed the commonly known steps: selection and screening of external hazards, hazard assessment for screened-in external events, analysis of plant response and fragility, PSA model development, and risk quantification and interpretation of results. As a result of event selection and screening the following weather related external hazards were subject to detailed analysis: extreme wind, extreme rainfall (precipitation), extreme snow, extremely high and extremely low temperatures, lightning, frost and ice formation. The analysis proved to be a significant challenge due to scarcity of data, lack of knowledge, as well as limitations of existing PSA methodologies. This paper presents an overview of the external events PSA performed for the Paks NPP. Important methodological aspects are summarised. Key analysis findings and unresolved issues that need further elaboration are highlighted. Development of external events PSA for the Paks NPP was completed by the end of 2012. The analysis followed the commonly known steps: selection and screening of external hazards, hazard assessment for screened-in external events, analysis of plant response and fragility, PSA model development, and risk

  15. NPP Boreal Forest: Consistent Worldwide Site Estimates, 1965-1995, R1

    Data.gov (United States)

    National Aeronautics and Space Administration — This data set provides estimates of above- and below-ground biomass, above- and below-ground NPP (ANPP and BNPP), and total NPP(TNPP) for selected North American and...

  16. Equipment Reliability Program in NPP Krsko

    International Nuclear Information System (INIS)

    Skaler, F.; Djetelic, N.

    2006-01-01

    Operation that is safe, reliable, effective and acceptable to public is the common message in a mission statement of commercial nuclear power plants (NPPs). To fulfill these goals, nuclear industry, among other areas, has to focus on: 1 Human Performance (HU) and 2 Equipment Reliability (EQ). The performance objective of HU is as follows: The behaviors of all personnel result in safe and reliable station operation. While unwanted human behaviors in operations mostly result directly in the event, the behavior flaws either in the area of maintenance or engineering usually cause decreased equipment reliability. Unsatisfied Human performance leads even the best designed power plants into significant operating events, which can be found as well-known examples in nuclear industry. Equipment reliability is today recognized as the key to success. While the human performance at most NPPs has been improving since the start of WANO / INPO / IAEA evaluations, the open energy market has forced the nuclear plants to reduce production costs and operate more reliably and effectively. The balance between these two (opposite) goals has made equipment reliability even more important for safe, reliable and efficient production. Insisting on on-line operation by ignoring some principles of safety could nowadays in a well-developed safety culture and human performance environment exceed the cost of electricity losses. In last decade the leading USA nuclear companies put a lot of effort to improve equipment reliability primarily based on INPO Equipment Reliability Program AP-913 at their NPP stations. The Equipment Reliability Program is the key program not only for safe and reliable operation, but also for the Life Cycle Management and Aging Management on the way to the nuclear power plant life extension. The purpose of Equipment Reliability process is to identify, organize, integrate and coordinate equipment reliability activities (preventive and predictive maintenance, maintenance

  17. NPP Krsko Severe Accident Management Guidelines Implementation

    International Nuclear Information System (INIS)

    Basic, I.; Krajnc, B.; Bilic-Zabric, T.; Spiler, J.

    2002-01-01

    Severe Accident Management is a framework to identify and implement the Emergency Response Capabilities that can be used to prevent or mitigate severe accidents and their consequences. The USA NRC has indicated that the development of a licensee plant specific accident management program will be required in order to close out the severe accident regulatory issue (Ref. SECY-88-147). Generic Letter 88-20 ties the Accident management Program to IPE for each plant. The SECY-89-012 defines those actions taken during the course of an accident by the plant operating and technical staff to: 1) prevent core damage, 2) terminate the progress of core damage if it begins and retain the core within the reactor vessel, 3) maintain containment integrity as long as possible, and 4) minimize offsite releases. The subject of this paper is to document the severe accident management activities, which resulted in a plant specific Severe Accident Management Guidelines implementation. They have been developed based on the Krsko IPE (Individual Plant Examination) insights, Generic WOG SAMGs (Westinghouse Owners Group Severe Accident Management Guidances) and plant specific documents developed within this effort. Among the required plant specific actions the following are the most important ones: Identification and documentation of those Krsko plant specific severe accident management features (which also resulted from the IPE investigations). The development of the Krsko plant specific background documents (Severe Accident Plant Specific Strategies and SAMG Setpoint Calculation). Also, paper discusses effort done in the areas of NPP Krsko SAMG review (internal and external ), validation on Krsko Full Scope Simulator (Severe Accident sequences are simulated by MAAP4 in real time) and world 1st IAEA Review of Accident Management Programmes (RAMP). (author)

  18. Achievements and challenges of Paks NPP

    International Nuclear Information System (INIS)

    Bajsz, J.; Katona, T.

    2002-01-01

    As the six year long safety upgrading program at Paks NPP is approaching its final stage this year, it is a good opportunity to draw the conclusion: what have been done and how have measures influenced the safety of the plant. In its first part the paper gives an overview of the program's main issues, assesses the results from the point of view of safety, reliability and cost effectiveness as well. In the second part a survey of future tasks follows: (1) Hungary is joining to the EU. The accession process so far has not revealed any major problems concerning nuclear safety which could be seen as obstacles toward the membership. However the plant should be ready to meet the increasing level of safety regulations. Further safety upgrading measures are planned, mostly in the field of severe accident management. (2) The electricity market liberalisation in Hungary will start in 2003 and being a EU member state, the full market opening will happen within a few years. The plant has to take into account the specificity of market functioning. The most important thing is to preserve the present cost advantage of nuclear electricity generation within the market conditions. The paper presents measures performed and planned to keep the unit generation cost competitive. (3) The first unit at Paks will mark its 20't'h anniversary this year. Lifetime management issues are at the centre of the engineering activities. The work already started to prepare the lifetime extension for 20 years. The program for the license renewal, which was elaborated jointly with the nuclear regulatory body will be described.(author)

  19. Vandellos 1 NPP decommissioning feedback experience

    International Nuclear Information System (INIS)

    Fernandez, Rodriguez A.

    2003-01-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  20. Integrated NPP life cycle management - Agency's approach

    International Nuclear Information System (INIS)

    Gueorguiev, B.

    2002-01-01

    administrative - managerial or/and social - political activities aimed at the achievement of an optimised long term save and reliable operation of the plant including its decommissioning. Optimisation of the plant operational life is the most economical option equivalent to providing additional generating capacity. In its turn optimisation of operational or service life means extension of the operational license to the extent possible having in mind that the plant performance continues to maintain its safety and competitiveness on the market. To meet these requirements the need for an integrated NPP life management approach is becoming more and more evident. The IAEA in response to the needs of the Member states is implementing several programmes including the project on engineering and management practices for optimisation of nuclear power plant service life including decommissioning. The Project scope includes different possible modes of IAEA operations for the purposes of information exchange and technology transfer. It means arrangements for technical, advisory and consultant group meetings, development of databases and guidance documents on proven practices, co-ordinated research projects, technical co-operation projects, expert services, training activities, co-operation with other International organizations and some others. A number of issues are under consideration. They include economic analysis and considerations related to decision on continued operation versus decommissioning, optimisation of operation/maintenance/In-service inspection regimes to facilitate life management programmes, aging management and mitigation measures with regard to control and instrumentation, primary and secondary circuit equipment integrity, assessment of structural materials, creation and development of supporting databases, preservation of knowledge including aspects of training and qualification of NPP personnel, work force aging, pre-shut down and decommissioning activities

  1. Vandellos 1 NPP decommissioning feedback experience

    Energy Technology Data Exchange (ETDEWEB)

    Fernandez, Rodriguez A. [Empresa Nacional de Residuos Radioactivos, ENPRESA, Madrid (Spain)

    2003-07-01

    The Vandellos 1 Nuclear Power Plant (CNV1) is located on the Mediterranean coast in the province of Tarragona (Spain). The Plant is of the European Natural Uranium Graphite-Gas type. The thermal power of the plant amounts to 1,670 MWt, its electrical output being 500 Mwe. The Plant started-up commercial service in May 1972; its final shutdown, due to a fire in the turbines, occurred in October 1989, after 17 years of operation with an accumulated energy production of 55,647 GWh. The option of decommissioning accepted by the Ministry of Industry, consists of first removing the spent fuel and conditioning the operating radioactive wastes, and then undertaking dismantling of almost all the structures and components located outside the reactor vessel, except those ensuring confinement of the vessel itself and the safety and surveillance of the facility and site. No action will be taken with respect to the vessel, in which the reactor will remain confined without nuclear fuel and with its internal components intact until completion of the waiting (dormancy) period. The site itself will be kept under surveillance during dormancy phase, following partial clearance, the remaining installations being left within the new site perimeter in a situation of monitored confinement. Following the dormancy period, which will last some 30 years, total dismantling of the remaining installations will be undertaken, this implying subsequent complete clearance of the site. The project was started in November of 1992, and the works on site began in 1998. The safe enclosure consists only in the reactor pressure vessel, which will be left on site. The activity content of the vessel is about 100 000 Ci, mostly Co 60. Part of the Stage 2 concept is the total static isolation of this vessel. The vessel has 1 700 penetrations, the pipes of which were cut, seal-welded and inspected. After five years of works in Vandellos 1 NPP decommissioning, ENRESA has an experience and knowledge, that is

  2. To the problem of reliability standardization in computer-aided manufacturing at NPP units

    International Nuclear Information System (INIS)

    Yastrebenetskij, M.A.; Shvyryaev, Yu.V.; Spektor, L.I.; Nikonenko, I.V.

    1989-01-01

    The problems of reliability standardization in computer-aided manufacturing of NPP units considering the following approaches: computer-aided manufacturing of NPP units as a part of automated technological complex; computer-aided manufacturing of NPP units as multi-functional system, are analyzed. Selection of the composition of reliability indeces for computer-aided manufacturing of NPP units for each of the approaches considered is substantiated

  3. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  4. Validation of MCNP NPP Activation Simulations for Decommissioning Studies by Analysis of NPP Neutron Activation Foil Measurement Campaigns

    Directory of Open Access Journals (Sweden)

    Volmert Ben

    2016-01-01

    Full Text Available In this paper, an overview of the Swiss Nuclear Power Plant (NPP activation methodology is presented and the work towards its validation by in-situ NPP foil irradiation campaigns is outlined. Nuclear Research and consultancy Group (NRG in The Netherlands has been given the task of performing the corresponding neutron metrology. For this purpose, small Aluminium boxes containing a set of circular-shaped neutron activation foils have been prepared. After being irradiated for one complete reactor cycle, the sets have been successfully retrieved, followed by gamma-spectrometric measurements of the individual foils at NRG. Along with the individual activities of the foils, the reaction rates and thermal, intermediate and fast neutron fluence rates at the foil locations have been determined. These determinations include appropriate corrections for gamma self-absorption and neutron self-shielding as well as corresponding measurement uncertainties. The comparison of the NPP Monte Carlo calculations with the results of the foil measurements is done by using an individual generic MCNP model functioning as an interface and allowing the simulation of individual foil activation by predetermined neutron spectra. To summarize, the comparison between calculation and measurement serve as a sound validation of the Swiss NPP activation methodology by demonstrating a satisfying agreement between measurement and calculation. Finally, the validation offers a chance for further improvements of the existing NPP models by ensuing calibration and/or modelling optimizations for key components and structures.

  5. Core design methodology and software for Temelin NPP

    International Nuclear Information System (INIS)

    Havluj, F; Hejzlar, J.; Klouzal, J.; Stary, V.; Vocka, R.

    2011-01-01

    In the frame of the process of fuel vendor change at Temelin NPP in the Czech Republic, where, starting since 2010, TVEL TVSA-T fuel is loaded instead of Westinghouse VVANTAGE-6 fuel, new methodologies for core design and core reload safety evaluation have been developed. These documents are based on the methodologies delivered by TVEL within the fuel contract, and they were further adapted according to Temelin NPP operational needs and according to the current practice at NPP. Along with the methodology development the 3D core analysis code ANDREA, licensed for core reload safety evaluation in 2010, have been upgraded in order to optimize the safety evaluation process. New sequences of calculations were implemented in order to simplify the evaluation of different limiting parameters and output visualization tools were developed to make the verification process user friendly. Interfaces to the fuel performance code TRANSURANUS and sub-channel analysis code SUBCAL were developed as well. (authors)

  6. Ways of solving the problem of NPP evaporate concentrate storage

    International Nuclear Information System (INIS)

    Dmitriev, S.A.; Lifanov, F.A.; Savkin, A.E.; Lashchenov, S.M.

    2000-01-01

    The use of next engineering operations: isotope separation using oxidation, filtration and selective sorption methods, hardening and long term secondary radioactive waste disposal (cement compound from filtration stage and depleted sorbent on filters); concentration and preparation of dry salts from the radionuclide-free stillage residues were proposed for NPP waste reprocessing. The laboratory and pilot tests that demonstrated the possibility for purification of NPP stillage residues from radionuclides to the levels less than maximum permissible ones were conducted. The purified stillage residues are sent for the burial after drying. The calculations of material flows are treated by the example of the Kursk NPP stillage residue and the scheme of the waste retrieval is given [ru

  7. The local impacts of Borssele NPP closing down

    International Nuclear Information System (INIS)

    Mandos, J.L.

    2000-01-01

    The municipal council of Borsele considers that the use of nuclear energy is a question of national policy, but considers itself responsible for town and country planning, safety and employment. The two latter aspects are especially significant if plans for shutdown are concerned. Confidence in safety of the NPP in Borsele has increased in recent years due to transparent information policy of the power plant itself as well as the local government and most of the employees living in the area. If considering the circumstances under which the decision about the closure of NPP one could sees this is a purely political decision. The local government will continue the close cooperation with the National government and the Parliament in solving the problem of employment and social impact of NPP shutdown

  8. Main principles of the Chernobyl' NPP zone development

    International Nuclear Information System (INIS)

    Ignatenko, E.I.; Komarov, V.I.; Zverkov, V.V.; Proskuryakov, A.G.

    1989-01-01

    It is suggested to divide the Chernobyl' NPP zone into two parts, which are the alienation and evacuation (buffer) zones. The alienation zone includes the areas with greatest contamination around the Chernobyl' NPP. The population residence in this zone is forbidden. The watching method of working with short-time personnel residence is suggested to be used in this zone. The buffer zone is the territory out of the alienation zone boundaries including all settlements, from which the population is evacuated. Constant residence is permitted in the buffer zone for persons 50 and more years old with introduction of restrictions for diet and residence organization. The production activity in this zone includes operation of three units of the Chernobyl' NPP, works with the Ukrytie object and researches. Operations connected with radioactive waste processing and redisposal from places of storage is not recommended to be done. It is suggested to develop methods for local radioactive waste processing

  9. Computer Security of NPP Instrumentation and Control Systems: Cyber Threats

    International Nuclear Information System (INIS)

    Klevtsov, A.L.; Trubchaninov, S.A.

    2015-01-01

    The paper is devoted to cyber threats, as one of the aspects in computer security of instrumentation and control systems for nuclear power plants (NPP). The basic concepts, terms and definitions are shortly addressed. The paper presents a detailed analysis of potential cyber threats during the design and operation of NPP instrumentation and control systems. Eleven major types of threats are considered, including: the malicious software and hardware Trojans (in particular, in commercial-off-the-shelf software and hardware), computer attacks through data networks and intrusion of malicious software from an external storage media and portable devices. Particular attention is paid to the potential use of lower safety class software as a way of harmful effects (including the intrusion of malicious fragments of code) on higher safety class software. The examples of actual incidents at various nuclear facilities caused by intentional cyber attacks or unintentional computer errors during the operation of software of systems important to NPP safety.

  10. System for ecological monitoring and assessment for NPP site environment

    International Nuclear Information System (INIS)

    Vorob'ev, E.I.; Olejnikov, N.F.; Reznichenko, V.Yu.

    1987-01-01

    On the basis of the Leningrad NPP named after V.I. Lenin the development of a system for ecological monitoring and assessment (EMA) of the environment state and health of personnel and population has started in the EMA program framework. The program of ecological monitoring and assessment coordinates the works on the study of NPP effect on the nature and people, effect of separate factors and their combination, methods and models for the description of the effects, forecasting and evaluation, selection of the optimal protection strategies. Scientific foundations, structure and content of the EMA program are given to coordinate the works carried out according to the program with other works carried out in the country in this direction. The paper deals with the composition of monitoring parameters of the standard system of ecological monitoring of the environment for NPP

  11. Decommissioning and radioactive waste management. The European Commission overview

    International Nuclear Information System (INIS)

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  12. The Bohunice NPP V-1 units nuclear safety upgrading

    International Nuclear Information System (INIS)

    Mlcuch, M.

    2000-01-01

    Safety upgrading and operational reliability improvement was carried out by the Bohunice NPP V-1 staff continuously since the plant commissioning. By now, more than 1200 minor or major modifications have been implemented, either by the NPP maintenance staff or by the contractors. Based on findings of safety assessment missions invited by Bohunice NPP in 1990 - 1991, the Czecho-slovak Nuclear Regulatory Authority (CSKAE) issued the decision No. 5/91 of 81 safety upgrading measures to be taken in different areas. These improvements are referred to as the 'Small Reconstruction of the Bohunice V-1 NPP'. Realization of measures during Small reconstruction of the Bohunice NPP V-1 became a power plant, which further operation is acceptable from safety point of view, but it is also necessary further safety improvement. During the period of the Small Reconstruction the development of a Safety Report for the Gradual reconstruction has been completed. Based on this report the SR Nuclear Regulatory Authority issued the Decision No. 1/94, in which requires 59 upgrading measures in different areas to be addressed. The development of Basic Engineering of the Gradual Reconstruction has been contracted to the Siemens AG. Implementation of safety measures are provided through contract with the consortium REKON (which consists of Siemens AG company and Nuclear Power Plants Research Institute Trnava) and other Czech, Russian and Slovak companies. The Gradual Reconstruction of Bohunice NPP V-1 will be finished in 2000. By implementation of the measures carried out during Gradual Reconstruction achievement of an internationally acceptable nuclear safety level will be reached. (author)

  13. Safety analysis of accident localization system

    International Nuclear Information System (INIS)

    1999-01-01

    A complex safety analysis of accident localization system of Ignalina NPP was performed. Calculation results obtained, results of non-destruct ing testing and experimental data of reinforced concrete testing of buildings does not revealed deficiencies of buildings of accident localization system at unit 1 of Ignalina NPP. Calculations were performed using codes NEPTUNE, ALGOR, CONTAIN

  14. The EC TACIS project 'Social impact of closing Chornobyl NPP' objectives, tasks and intended outcomes

    International Nuclear Information System (INIS)

    Schoen, A.

    2001-01-01

    Being part of the common activities of Slavutich and ChNPP, our EC TACIS project representatives already actively participated in the elaboration of the state programme aimed to ensure the social security of the ChNPP personnel and the population of Slavutich in the result of the final shut down of ChNPP

  15. On improving the NPP construction long-term planning

    International Nuclear Information System (INIS)

    Solov'ev, M.M.

    1980-01-01

    General approaches to solving the problems of long-term planning of the construction-mounting work volume and introduction of power capacities at different paces of power unit commission and norms of construction time are considered. Problems associated with location and development of subsidiary industries providing NPP construction are discussed. It is shown that decrease of WWER-1000 reactor type NPP construction time from 24 to 12 months results in reduction of required high-skilled engineers, managerial staff, unique construction mechanisms and engines as well as in improvement of conditions for conducting measures on work arrangement during preparation of construction industry and mounting of the first assemblies

  16. NPP capital equipment life control facilities and tools

    International Nuclear Information System (INIS)

    Nekrasov, A.V.; Proskuryakov, K.N.

    2009-01-01

    Algorithms and simulation package for calculation of eigen modes of coolant pressure oscillations in equipment of primary coolant circuit of WWER-1000 NPP, tuned-circuit Q-factor of an oscillating contour of the coolant, fluctuation frequencies pass band and attenuation factors of were developed. Calculation results for cases of presence and absence of gaseous state radiolysis products in the coolant were obtained. Results analysis makes it possible to disclose operating conditions which result in raised vibrations, and to develop control response in NPP industrial control system for their prevention [ru

  17. NPP Temelin instrumentation and control system upgrade and verification

    International Nuclear Information System (INIS)

    Ubra, O.; Petrlik, J.

    1998-01-01

    Two units of Ver 1000 type of the Czech nuclear power plant Temelin, which are under construction are being upgraded with the latest instrumentation and control system delivered by WEC. To confirm that the functional design of the new Reactor Control and Limitation System, Turbine Control System and Plant Control System are in compliance with the Czech customer requirements and that these requirements are compatible with NPP Temelin upgraded technology, the verification of the control systems has been performed. The method of transient analysis has been applied. Some details of the NPP Temelin Reactor Control and Limitation System verification are presented.(author)

  18. NPP life management program - status report for Slovenia

    International Nuclear Information System (INIS)

    Glumac, B.

    1998-01-01

    Status report on NPP life management in Slovenia is dealing with possible life extension of NPP Krsko which comprises: replacement of steam generator; power upgrade; exchange of plant process computer; snubber reduction program, additional forced ventilation cooling system. Fuel improvements are predicted as well as the problems of storing spent fuel, low and intermediate waste if the plant is to operate through 2023 and possibly beyond that date. Related research activities are concerned with radiation damage, modelling of reactor core parameters by Monte Carlo calculations and PSA and severe accidents studies. Most of the activities are performed in cooperation with foreign organisations

  19. Experimental analysis of specification language impact on NPP software diversity

    International Nuclear Information System (INIS)

    Yoo, Chang Sik; Seong, Poong Hyun

    1998-01-01

    When redundancy and diversity is applied in NPP digital computer system, diversification of system software may be a critical point for the entire system dependability. As the means of enhancing software diversity, specification language diversity is suggested in this study. We set up a simple hypothesis for the specification language impact on common errors, and an experiment based on NPP protection system application was performed. Experiment result showed that this hypothesis could be justified and specification language diversity is effective in overcoming software common mode failure problem

  20. Problems of complex automation of process at a NPP

    International Nuclear Information System (INIS)

    Naumov, A.V.

    1981-01-01

    The importance of theoretical investigation in determining the level and quality of NPP automation is discussed. Achievements gained in this direction are briefly reviewed on the example of domestic NPPs. Two models of the problem solution on function distribution between the operator and technical means are outlined. The processes subjected to automation are enumerated. Development of the optimal methods of power automatic control of power units is one of the most important problems of NPP automation. Automation of discrete operations especially during the start-up, shut-down or in imergency situations becomes important [ru

  1. Start-up of NPP Krsko; Pokusno obratovanje NE Krsko

    Energy Technology Data Exchange (ETDEWEB)

    Spiler, J; Aralica, J [Nuklearna elektrana Krsko, Krsko (Yugoslavia)

    1984-07-01

    The report describes a review of start-up program and its realisation. There are also described some more significant start-up results with their evaluation. The most significant operation criteria are compared between NPP Krsko and other similar plants in the world. The comparison shows that after the first contractors and operation personnel efforts have been accomplished, our first nuclear power plant is a safe and reliable source of electric power. At the end there are listed NPP Krsko start-up recommendations and experience. (author)

  2. Structure study and design of Qinshan NPP PCCV

    International Nuclear Information System (INIS)

    Xia Zufeng; Xu Yongzhi; Wang Tianzhen; Wu Jibiao

    1993-02-01

    The design process of Qinshan NPP (nuclear power plant) PCCV (prestressed concrete containment vessel) is summarized. The tendon test, structural description, design bases and analysis method are introduced. The arrangement for preventing concrete from cracking and design features of post-tensioning system and steel liner are presented. The results of model test and non-linear analysis for ultimate load in Qinshan NPP PCCV are also given. Through the integrity test of PCCV, it shows that the test values are in agreement with predicted values, the structure is excellent and the performance of leak tightness conforms to the safety requirements

  3. EOPs at NPP Temelin: Analytical support for EOPs verification

    International Nuclear Information System (INIS)

    Bica, M.

    1999-01-01

    The process of implementation of symptom-based emergency operating procedures (EOPs) started at the NPP Temelin in 1993. The process has the following phases: development of symptom-based EOPs; EOPs verification; EOPs validation; operating personnel training; EOPs control and experience feedback. The development of Temelin specific EOPs was based on technology and know-how transfer using the Emergency Response Guidelines Methodology developed by the Westinghouse Owner Group. In this lecture the implementation of symptom-based EOPs in the the NPP Temelin is described

  4. Corrosion strength monitoring of NPP component residual lifetime

    International Nuclear Information System (INIS)

    Denisov, V.G.; Belous, V.N.; Arzhaev, A.I.; Shuvalov, V.A.

    1994-01-01

    Importance of corrosion and fatigue monitoring; types of corrosion determine the NPP equipment life; why automated on-line corrosion and fatigue monitoring is preferable; major stages of lifetime monitoring system development; major groups of sensors for corrosion and strength monitoring system; high temperature on-line monitoring of water chemistry and corrosion; the RBMK-1000 NPP unit automatic water chemistry and corrosion monitoring scheme; examples of pitting, crevice and general corrosion forecast calculations on the basis of corrosion monitoring data; scheme of an experimental facility for water chemistry and corrosion monitoring sensor testing. 2 figs., 4 tabs

  5. Study on the risk-informed regulation of NPP

    International Nuclear Information System (INIS)

    Wang Chaogui

    2007-01-01

    The risk-informed regulation is a modern type of NPP safety management mode using both deterministic and probabilistic approaches. It is necessary to entirely and systematically study the associated regulations, standards and practices in order to promote the developments of risk-informed regulations in China. This paper introduces the risk-informed regulation, gives out the basic principles, method and acceptance risk criteria of risk-informed decision,making, discusses the PSA requirements for risk-informed decision-making and makes some suggestions about the application of risk-informed regulations in Chinese NPP. (authors)

  6. Disposal of the radioactive contaminated soils from the NPP site

    International Nuclear Information System (INIS)

    Matusek, I.; Plsko, J.; Sajtlava, M.; Hulla, J.; Kovacs, T.

    2004-01-01

    Disposal of contaminated soils at site of NPP is one of the most important task within the frame of research and development tasks of the NPP decommissioning. The works within this field can be seen in several areas. Considered soil activity monitoring, observation of its geo-technical and geo-chemical parameters, volume balance, research of the radio nuclides behaviour in the soil and simulation of their influence on the surrounding environment with special emphasis on underground water, project studies and construction of the disposal facility for contaminated soils. This work presents overview of gained results in the mentioned areas of the research and development. (author)

  7. The evolution of the fuel cycle in the Dukovany NPP

    Energy Technology Data Exchange (ETDEWEB)

    Bajgl, J [Jaderna Elektrarna, Dukovany (Czech Republic)

    1994-12-31

    The ten-year operational experience of four WWER-440 units in Dukovany NPP with a total number of 35 cycles is outlined. The strategy of fuel reloading has been changed from out-in schemes to low-leakage patterns. The linear pin power limitation will be introduced. The main physical limits and conditions for the NPP operation are listed. The main goal is to go to a full 4-year fuel cycle in which the burnup will be about 40 Mwd/kg U. 6 tabs.

  8. NPOESS Preparatory Project (NPP) Environmental Products

    Science.gov (United States)

    Grant, K. D.; Smith, D. C.

    2011-12-01

    The National Oceanic and Atmospheric Administration (NOAA) and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation civilian weather and environmental satellite system: the Joint Polar Satellite System (JPSS). The Joint Polar Satellite System will contribute the afternoon orbit component and ground processing system of the restructured National Polar-orbiting Operational Environmental Satellite System (NPOESS). As such, the Joint Polar Satellite System replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the ground processing component of both POES and the Defense Meteorological Satellite Program (DMSP) replacement, known as the Defense Weather Satellite System (DWSS), managed by the Department of Defense (DoD). The Joint Polar Satellite System satellite will carry a suite of sensors designed to collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The ground processing system for the Joint Polar Satellite System is known as the Common Ground System (JPSS CGS), and consists of a Command, Control, and Communications Segment (C3S) and the Interface Data Processing Segment (IDPS). Both are developed by Raytheon Intelligence and Information Systems (IIS). The Interface Data Processing Segment will process Joint Polar Satellite System and Defense Weather Satellite System satellite data to provide environmental data products (aka, Environmental Data Records or EDRs) to the National Oceanic and Atmospheric Administration and Department of Defense processing centers operated by the United States government. The Interface Data Processing Segment will process Environmental Data Records beginning with the NPOESS Preparatory Project (NPP) and continue through the lifetime of the Joint Polar Satellite System and Defense Weather Satellite System programs. Under the National Polar-orbiting Operational Environmental

  9. Decommissioning of NPP A1 - HWGCR type

    International Nuclear Information System (INIS)

    Burclova, J.

    1998-01-01

    Prototype nuclear power plant A-1 located at Jaslovske Bohunice, was a HWGCR with channel type reactor KS 150 (refuelling during operation) and capacity of 143 MWe. Single unit has been constructed with reactor hall building containing reactor vessel, heavy water system and equipment for spent fuel handling. Another compartment of main building contents coolant system piping, six steam generators and six turbo compressors, the turbine hall was equipped by three turbines. Unit also shares liquid radwaste treatment and storage buildings and ventilation systems including chimney. It started operation in 1972 and was shutdown in 1977 after primary coolant system integrity accident. In 1979 a final decision was made to decommission this plant. The absence of waste treatment technologies and repository and not sufficient storage capacity affected the planning and realization of decommissioning for NPP A-1. The decommissioning policy for the first stage is for lack of regulations based on 'case by case' strategy. For these reasons and for not existence of Decommissioning Found until 1995 the preferred decommissioning option is based on differed decommissioning with safe enclosure of confinement. Transfer of undamaged spent fuel cooled in organic coolant to Russia was finished in 1990. It was necessary to develop new technology for the damaged fuel preparation for transport. The barriers check-up and dismantling of secondary circuit and cooling towers was performed during 1989/90. The complex plan for the first phase of A-1 decommissioning - the status with treated operational radwaste, removed contamination and restored treated waste and spent fuel (in case of interruption of transfer to Russia) was developed in 1993-1994. Under this project bituminization of all liquid operational radwaste (concentrates) was performed during 1995/96, vitrification of inorganic spent fuel coolant started at 1996, decontamination of spent fuel pool coolant occurs (under AEA Technology

  10. Cernavoda NPP: Training for safety and reliability

    International Nuclear Information System (INIS)

    Postolache, Laura Lia

    2001-01-01

    The safe and reliable operation of NPP require successful integration of plant and system design (1), programmes and procedures (2) and qualified human resources (3). Of these three components, station personnel and management have capability to influence and improve programmes and competence of qualified personnel. Qualifying personnel includes selection, training and evaluation that meet the established performance standards. Training, therefore prepares people to achieve such competence. The critical role of operations personnel has been rightly emphasized by every country with a nuclear power programme. So far as operation team is concerned, they have to work, on the one hand with exacting safety rules and at the same time, they have to do the right thing at all times. In essence, they have to be prepared for new, emergency situations as well as for routine work. The plant operation in the Control Room is essentially a man - machine interaction and a safe and reliable operation requires them to take high quality decisions even under stressful conditions. Here lies therefore the need for high competent and licensed operations engineers who will ensure operation within the operating license of the station under the all conditions. The development of a long-term comprehensive training for Operation Staff is a requirement. The program addresses the qualification requirements of the various nuclear positions on shift, the outline content of the required training programs and the evaluation per the Systematic Approach to Training (SAT). A nuclear operator's training begins the moment he/she enters the station. It takes four to six years to develop the skills required to demonstrate that the candidate is an appropriate choice for the position. Then there's a further about two years of intense training at the Training Center on a simulator. After successful completion of the program, the candidate is authorized by the CNCAN (National Commission for Control of Nuclear

  11. New Emergency control center of Slovenske Elektrarne Bohunice NPP

    International Nuclear Information System (INIS)

    Pecko, E.

    2012-01-01

    Emergency preparedness of nuclear power plant and operation assurance in case of a possible emergency calls to have devices for emergency response with equipment for rapid detection and continuous evaluation of anticipated events. Chief executive body designated to manage a nuclear power plant during major events is the emergency committee (EC). Emergency Committee is a part of the Emergency Response Organization (ERO). The following centers are on alert to ensure the activities of the ERO - Emergency Response office: - control room (CR) and emergency control room (ECR); - emergency management center (EMC); - Monitoring Centre (MC); - emergency backup control center (EBCC); - congregations of civil protection (CP) and CP shelters; - communications with warning and notification system (VARVYR). From a historical and practical point of view in the vicinity of Jaslovske Bohunice has been set up a joint emergency control center. The center was located on the territory of the former already inoperative V1 NPP. V1 NPP is currently integrated into the organizational structure of JAVYS. Operating Bohunice V2 NPP plant is a designated part of the Slovenske Elektrarne, a. s., whose majority owner is an Italian operator ENEL. In terms of various relevant factors, it was decided to build a new emergency management center on the territory of operating V2 NPP, meet the current standards.

  12. Flaw detection of welded joints in NPP equipment assembly

    International Nuclear Information System (INIS)

    Kesler, N.A.; Polevik, V.A.; Orlov, N.S.

    1984-01-01

    State of the art and prospects of development of ultrasonic and radiography testing of welded joints for quality used in NPP equipment assembly are considered. Recommendations are given on reducing the labour content with the use of these methods. Specifications for the developed facilities intended for automation and mechanization of the described quality control methods are presented

  13. Welding of large-size embelled fittings in NPP construction

    International Nuclear Information System (INIS)

    Semenov, N.A.; Savinov, O.A.

    1988-01-01

    Drawbacks of the accepted technology for peoducing embedded fittings are considered. Activities on modernization of the standard ADF-2001 automatic welding machine are described. Results of testing the samples of welded joints performed using the modernized automatic welding machine, and economic effect caused by its introduction at the balakovo NPP second unit construction are presented

  14. Radiation protection in decommissioning of the NPP V1

    International Nuclear Information System (INIS)

    Svitek, J.; Kaizer, J.; Siska, J.

    2014-01-01

    What's new in decommissioning of the NPP V1? In 2014 the first stage of the decommissioning should be finished. The program of the first stage was characterized by decommissioning of the non-contaminated facilities and buildings (facilities and buildings out of the control area). However, during the first stage, two key activities were done during which radiation protection had to be especially supervised: BIDSF project - Treatment and Conditioning of Wet Historical Waste - Sludge and Sorbents in the operational tanks NPP V1 (the treatment has been the condition of the regulatory body for the ending of the first stage) and preparation of decontamination of both primary circuits NPP (without reactors). In the year 2015, the second stage of decommissioning should be started. Program for the second stage is broad and it includes fragmentation and treatment of activated parts of the primary circuits (reactors, their internal parts, shielding cassettes). Modification of the radiation protection equipment on the NPP site has been made by BIDSF projects. During the first stage, two basic projects have been done: C12 - Refurbishment of the radiation protection monitoring equipment and C-10 - Free release of decommissioning materials. The present state of monitoring systems, as the result of the aforementioned projects, and the first experiences are main part of this presentation. Another activity, which prepared basic conditions for an execution of radiation protection in the second stage of decommissioning, was the preparation of documents for the procurement of license for the second stage of decommissioning. (authors)

  15. Some aspects of RPV integrity of Ukrainian NPP's

    International Nuclear Information System (INIS)

    Zaritsky, N.; Kovyrshin, V.; Zhukov, P.

    1998-01-01

    The operating organisations in Ukraine implement the main IAEA recommendations concerned with NPP operational safety. Sufficient substantiation of the measures for improvement of WWER-1000 NPPs safety and reliability is provided. General information (chemical compositions and mechanical properties of reactor pressure vessel materials) is already collected on all Ukrainian WWER-1000 NPPs and transferred to International database on Pressure Vessel materials

  16. The post-accidents exploitation of Chernobyl NPP

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    1996-01-01

    Problems facing the Chernobyl NPP personnel since its commissioning and during its post-accident operation are considered. The accomplished measures on improving the power units safety, normalization of the radiation situation as well as the impact of psychological factor at the safety culture level are discussed

  17. The Chernobyl NPP decommissioning: Current status and alternatives

    International Nuclear Information System (INIS)

    Mikolaitchouk, H.; Steinberg, N.

    1996-01-01

    After the Chernobyl accident of April 26, 1986, many contradictory decisions were taken concerning the Chernobyl nuclear power plant (NPP) future. The principal source of contradictions was a deadline for a final shutdown of the Chernobyl NPP units. Alterations in a political and socioeconomic environment resulted in the latest decision of the Ukrainian Authorities about 2000 as a deadline for a beginning of the Chernobyl NPP decommissioning. The date seems a sound compromise among the parties concerned. However, in order to meet the data a lot of work should be done. First of all, a decommissioning strategy has to be established. The problem is complicated due to both site-specific aspects and an absence of proven solutions for the RBMK-type reactor decommissioning. In the paper the problem of decommissioning option selection is considered taking into account an influence of the following factors: relevant legislative and regulatory requirements; resources required to carry out decommissioning (man-power, equipment, technologies, waste management infrastructure, etc.); radiological and physical status of the plant, including structural integrity and predictable age and weather effects; impact of planned activities at the destroyed unit 4 and within the 30-km exclusion zone of the Chernobyl NPP; planed use of the site; socio-economic considerations

  18. Low level radioactive waste disposal in Kozloduy NPP in Bulgaria

    International Nuclear Information System (INIS)

    Stanchev, V.

    2001-01-01

    Kozloduy NPP is the biggest power plant in the Republic of Bulgaria. It is in operation since 1974 and for the past 25 years it has generated over 263 billion kWh electric power. The NPP share in the total electric production in 1998 was about 50%. It has six units in operation - four WWER 440 B-230 and two WWER 1000 B-320. In the nuclear reactor operation the generation of radioactive waste (RAW) is an inevitable process. The waste must be conditioned, stored and disposed of in a safe manner. There are no national radioactive waste disposal facilities, for waste generated by an NPP, in Bulgaria to the moment. This situation necessitates the storage of operational RAW to be carried out on site for a long period of time (30 to 50 years). Following the principle for protection of human health and environment now and in the future, Kozloduy NPP adopted the concept for conditioning the RAW to a stable solid form and placing the waste in a package which should keep its features for a sufficiently long term so that the package can be safely transported to the disposal site. (author)

  19. Device to measure level in a steam drum of NPP

    International Nuclear Information System (INIS)

    Vinogradov, Yu.A.

    1988-01-01

    Gravitation-hydrostatic device for measuring coolant level in a steam drum of NPP is described. The device enables to improve the accuracy and sensitivity of measuring coolant level above and below the submerged perforated sheet of the steam drum and decrease the amount of levelling vessels in the unit by 50%. 1 fig

  20. Heat resistance insulation for NPP pipelines and components

    International Nuclear Information System (INIS)

    Yurchenko, V.G.; Nazarova, G.A.; Popov, A.M.; Matveeva, N.F.

    1986-01-01

    To insulate hot surfaces of NPP process equipment and pipes it is suggested to use heat resistant insulation of foam aminoimides (FAI). Relative toxicity of aceton and acetaldehyd evolved from FAI in the process of thermal and thermal-oxidative break-down was determined. FAI can be used at 200 deg C