WorldWideScience

Sample records for hydroelectric power station

  1. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  2. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  3. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  4. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  5. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  6. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  7. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  8. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  9. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  10. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  11. [The mosquito fauna (Diptera: Culicidae) of the environs of the Sayan-Shushenskoe hydroelectric power station].

    Science.gov (United States)

    Gornostaeva, R M

    1999-01-01

    Among females and larvae of mosquitoes collected in 1969, 1981-1984 in the area of the Sayan-Shushenskoe hydroelectric power station (140 km up the Yenisei River from the Abakan city) 5 genera and 30 species were recorded. Based on recent collections and reference data (Gornostaeva e. a., 1969; Gornostaeva, Danilov, 1986) the fauna of the region in question includes 31 species of mosquitoes (Anopheles--1, Culiseta--2, Coquillettidia--1, Aedes--22, Culex--5).

  12. [Space-time water monitoring system at the Iriklinsk hydroelectric power station].

    Science.gov (United States)

    Deriabin, D G; Poliakov, E G; Priakhina, A A; Karimov, I F

    2002-01-01

    The Microbiosensor B 17677 F test system was applied to make a space-time monitoring of the biotoxicity of water used for production and everyday purposes at the Iriklinsk hydroelectric power station (IHEPS) and to identify the leading causes determining the biotoxicity of tested samples. There were seasonal variations in the biotoxicity with the maximum in spring and with minimum in winter and spring and a relationship of the spring rise in the biotoxicity to water pH changes. There was also an association of the certain values of the biotoxicity of industrial water with the concentration of petroleum products that are major pollutants at the IHEPS. The datum points that characterize the maximum level of technogenic exposure were identified.

  13. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  14. Neural network based inspection of voids and karst conduits in hydro-electric power station tunnels using GPR

    Science.gov (United States)

    Kilic, Gokhan; Eren, Levent

    2018-04-01

    This paper reports on the fundamental role played by Ground Penetrating Radar (GPR), alongside advanced processing and presentation methods, during the tunnel boring project at a Dam and Hydro-Electric Power Station. It identifies from collected GPR data such issues as incomplete grouting and the presence of karst conduits and voids and provides full details of the procedures adopted. In particular, the application of collected GPR data to the Neural Network (NN) method is discussed.

  15. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  16. [Experience in organization of joint actions of expert divisions during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station].

    Science.gov (United States)

    Kolkutin, V V; Ivanov, P L; Fetisov, V A; Afanas'ev, S A; Dorozhkin, O A; Vognerubov, R N; Kuznetsov, T L

    2010-01-01

    The authors illustrate positive experience in organization and coordination of joint actions of expert divisions of different sectors during the accident at P.S. Podporozniy Sayano-Shushenskaya hydroelectric power station in August 2009. Special emphasis is laid on the participation of experts of quick-reaction teams formed by territorial forensic medical bureaus, mobile and supporting forces from the adjacent regions.

  17. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  18. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  19. Ticks (Acari: Ixodidae) on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil.

    Science.gov (United States)

    Labruna, Marcelo B; de Paula, Cátia D; Lima, Thiago F; Sana, Dênis A

    2002-12-01

    From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paran river, between the states of S o Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species), Boophilus (1) and Anocentor (1). A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages) collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  20. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  1. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  2. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  3. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  4. [The social hygiene problems in the operator work of hydroelectric power station workers and the means for enhancing work capacity].

    Science.gov (United States)

    Karakashian, A N; Lepeshkina, T R; Ratushnaia, A N; Glushchenko, S S; Zakharenko, M I; Lastovchenko, V B; Diordichuk, T I

    1993-01-01

    Weight, tension and harmfulness of professional activity, peculiarities of labour conditions and characteristics of work, shift dynamics of operative personnel's working capacity were studied in the course of 8-hour working day currently accepted at hydroelectric power stations (HEPS) and experimental 12-hour schedule. Working conditions classified as "admissible", positive dynamics of operators' state, their social and material contentment were a basis for 12-hour two-shift schedule to be recommended as more appropriate. At the same time, problem of optimal shift schedules for operative personnel of HEPS remains unsolved and needs to be further explored.

  5. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  6. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  7. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  8. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  9. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  10. Fish population genetic structure shaped by hydroelectric power plants in the upper Rhine catchment.

    Science.gov (United States)

    Gouskov, Alexandre; Reyes, Marta; Wirthner-Bitterlin, Lisa; Vorburger, Christoph

    2016-02-01

    The Rhine catchment in Switzerland has been transformed by a chain of hydroelectric power stations. We addressed the impact of fragmentation on the genetic structure of fish populations by focusing on the European chub (Squalius cephalus). This fish species is not stocked and copes well with altered habitats, enabling an assessment of the effects of fragmentation per se. Using microsatellites, we genotyped 2133 chub from 47 sites within the catchment fragmented by 37 hydroelectric power stations, two weirs and the Rhine Falls. The shallow genetic population structure reflected drainage topology and was affected significantly by barriers to migration. The effect of power stations equipped with fishpasses on genetic differentiation was detectable, albeit weaker than that of man-made barriers without fishpasses. The Rhine Falls as the only long-standing natural obstacle (formed 14 000 to 17 000 years ago) also had a strong effect. Man-made barriers also exacerbated the upstream decrease in allelic diversity in the catchment, particularly when lacking fishpasses. Thus, existing fishpasses do have the desired effect of mitigating fragmentation, but barriers still reduce population connectivity in a fish that traverses fishpasses better than many other species. Less mobile species are likely to be affected more severely.

  11. ORSIM, Nuclear Fuel, Fossil Fuel Hydroelectric Power Plant Cost and Economics

    International Nuclear Information System (INIS)

    Prince, B.E.; Turnage, J.C.

    1984-01-01

    1 - Description of problem or function: ORSIM is an electric power generating system integration model which simulates the multi-year operation of a mixed power system consisting of fossil, nuclear, hydroelectric, and pumped-storage units. For any specified refueling schedule for nuclear units and future load forecast, the model determines a plan of operation for the system which attempts to minimize the total discounted operating cost over a specified study period. The analysis considers the effects of forced outages, spinning reserve operating constraints, and scheduled introduction and retirement of generating stations. The model determines a maintenance schedule for the non-nuclear stations (nuclear stations are maintained during refueling outages) and the optimum allocation of energy-fixed nuclear and hydroelectric resources. It calculates the expected energy generated by each station in the system, by period over the planning horizon, based on input or calculated incremental operating cost. It also calculates the expected loss-of- load probability and un-served energy demand for each period in the planning horizon. An optimum operating plan, designed to minimize the discounted total production cost, is then calculated, as are the costs of operating each station in the system and the discounted total production cost for the derived plan of operation. 2 - Method of solution: ORSIM searches for a particular mode of operation which, over a multi-year planning horizon, will minimize the total system operating cost of a particular electric power generation system discounted to the beginning of the planning horizon. It does this by: (a) calculating the planned maintenance outages for all units; (b) estimating the incremental discounted cost of energy produced by each station in the system for every subinterval of the planning horizon; (c) utilizing the incremental discounted costs of energy generation to calculate, via probabilistic simulation, the economic optimum

  12. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  13. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  14. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  15. New data on species of Demidospermus (Dactylogyridae: Monogenea) parasitizing fishes from the reservoir of the Itaipu Hydroelectric Power Station, Paraná State, Brazil, with new synonymies.

    Science.gov (United States)

    Cohen, Simone C; Kohn, Anna

    2008-01-01

    Eight known species of Demidospermus (Dactylogyridae, Monogenea) were collected from siluriform fishes from reservoir of the Itaipu Hydroelectric Power Station, Paraná, Brazil. Four of them are recorded for the first time in Brazil, enlarging their geographical distribution: Demidospermus armostus, Demidospermus anus, Demidospermus bidiverticulatum and Demidospermus valenciennesi. Demidospermus labrosi is synonymized with Demidospermus cornicinus and Demidospermus mandi with Demidospermus leptosynophallus and reported from two new hosts. Demidospermus paravalenciennesi and Demidospermus uncusvalidus were also collected.

  16. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  17. Hindrances to upstream migration of atlantic salmon (Salmo salar) in a northern Swedish river caused by a hydroelectric power-station

    International Nuclear Information System (INIS)

    Rivinoja, P.; Lundqvist, H.

    2001-01-01

    Many Baltic salmon rivers have lost their natural juvenile production due to human activities blocking or reducing access to their spawning grounds, e.g. damming, power generation, partial hinders, etc.. One such hindrance is a hydroelectric complex located in the lower reaches of River Umeaelven in northern Sweden. Water from the forbay created by the dam Norrfors is directed to the Stornorrfors power-station. At times, 100 per cent of the river is directed to the power-station. Water from the power-station then flows via a tunnel and outlet channel to the river. From the point of the tunnel's discharge into the river, the old river bed acts as a bypass channel directing migrating adult fish to a fish ladder located at the base of the dam. In this study, the effect that an additional turbine, that was installed at the power-station in 1986, had on fish passage run-time was examined. Changes in run-time were compared for two periods 1974-1985 and 1986-1995. In 1997, 55 wild and 25 hatchery salmon were captured in the Umeaelven estuary, radio tagged with uniquely coded tags, and tracked upstream. Both manual and automatic loggers were used to locate fish daily. The main findings show that only 26 per cent of the wild salmon and none of the hatchery salmon found the fish ladder. It is suggested that the salmon followed the main water discharge from the power-station outlet and are thus directed away from the entrance to the bypass channel leading to the fish ladder. Salmon respond by moving upstream or downstream depending on the current flow regimes. The bypass channel consists of partial hinders that may explain why it takes on average 52 days for the salmon to migrate 32 km from the estuary to the fish ladder. Adding a fourth turbine at the power-station did not appear to have changed the timing of the migration or the seasonal distribution of the migrating wild salmon through the fish ladder. There was no significant effect of the fourth turbine on the duration

  18. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  19. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  20. Electric power and the environment: An analysis of pollutant emissions at Argentine state-owned electric power stations

    Energy Technology Data Exchange (ETDEWEB)

    Carnevali, D; Suarez, C E [Instituto de Economia Energetica, San Carlos de Bariloche (Argentina)

    1991-08-01

    This paper describes the impact on particulate and 'greenhouse gases' emissions of substitution policies implemented by Argentine state-owned electric power stations. Those policies involve the substitution, on the one hand, of hydroelectric and nuclear energy for conventional thermal energy and, on the other hand, of natural gas for fuel oil, diesel oil and coal. As additional investments are required in conventional thermal power stations to prevent environmental pollution, the investment savings generated by substitution policies have been calculated. While the environmental impacts of hydroelectric, nuclear and natural gas facilities is locally significant and is experienced in geographical areas away from cities, there can be no doubt that the substitution policies implemented in the Argentine electricity sector have overall both ecological and economic benefits. (author). 1 ref., 8 figs, 2 tabs.

  1. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  2. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  3. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  4. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  5. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  6. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  7. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  8. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  9. Microbial diversity of an anoxic zone of a hydroelectric power station reservoir in Brazilian Amazonia.

    Science.gov (United States)

    Graças, Diego A; Miranda, Paulo R; Baraúna, Rafael A; McCulloch, John A; Ghilardi, Rubens; Schneider, Maria Paula C; Silva, Artur

    2011-11-01

    Microbial diversity was evaluated in an anoxic zone of Tucuruí Hydroelectric Power Station reservoir in Brazilian Amazonia using a culture-independent approach by amplifying and sequencing fragments of the 16S rRNA gene using metagenomic DNA as a template. Samples obtained from the photic, aphotic (40 m) and sediment (60 m) layers were used to construct six 16S rDNA libraries containing a total of 1,152 clones. The sediment, aphotic and photic layers presented 64, 33 and 35 unique archaeal operational taxonomic units (OTUs). The estimated richness of these layers was evaluated to be 153, 106 and 79 archaeal OTUs, respectively, using the abundance-based coverage estimator (ACE) and 114, 83 and 77 OTUs using the Chao1 estimator. For bacterial sequences, 114, 69 and 57 OTUs were found in the sediment, aphotic and photic layers, which presented estimated richnesses of 1,414, 522 and 197 OTUs (ACE) and 1,059, 1,014 and 148 OTUs (Chao1), respectively. Phylogenetic analyses of the sequences obtained revealed a high richness of microorganisms which participate in the carbon cycle, namely, methanogenic archaea and methanotrophic proteobacteria. Most sequences obtained belong to non-culturable prokaryotes. The present study offers the first glimpse of the huge microbial diversity of an anoxic area of a man-made lacustrine environment in the tropics.

  10. Counter rotating type hydroelectric unit suitable for tidal power station

    International Nuclear Information System (INIS)

    Kanemoto, T; Suzuki, T

    2010-01-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  11. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  12. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  13. Natural infection by Paramphistomoidea Stiles and Goldberger, 1910 trematodes in wild Marsh Deer (Blastocerus dichotomus Illiger, 1815) from Sérgio Mottas's hydroelectric power station flooding area.

    Science.gov (United States)

    do Nascimento, Cristiano G; do Nascimento, Adjair A; Mapeli, Elaine B; Tebaldi, José H; Duarte, José M B; Hoppe, Estevam G Lux

    2006-01-01

    Studies on helminthfauna of marsh deer Blastocerus dichotomus Illiger, 1815 are rare, although helminthic diseases are an important cause of mortality in these animals. Fifteen male and female adult marsh deer from Sergio Motta's hydroelectric power station flooding area at Paraná River which died during the capture and quarantine procedures, between 1998 and 1999, were necropsied. Three trematodes species, Paramphistomum cervi, Balanorchis anastrofus and Zygocotyle lunatum, all belonging to superfamily Paramphistomoidea, were identified. The obtained trematodes were identified, counted and their respectives descriptors of infection were determined. All necropsied animals were infected by helminths. Paramphistomum cervi was the most prevalent species, while Zygocotyle lunatum was found in only one animal.

  14. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  15. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  16. Amplification of Marzagao small scale hydroelectric power plant; Ampliacao da PCH de Marzagao

    Energy Technology Data Exchange (ETDEWEB)

    Zeller, A.R.; Porto, D.S.; Pinto, F.S. [Leme Engenharia, MG (Brazil); Melo, A.U.; Almeida, A.M.; Pereira, D.R. [Fertiligas Industria e Comercio Ltda., MG (Brazil)

    1991-12-31

    This work presents the modernization and power augmentation of Marzagao small scale hydroelectric power plant. In order that the costs of the project be compatible to the total of investments in the project, it was necessary the adoption of methodologies and time scales different from those used for large and medium scale hydroelectric power plants 5 figs.

  17. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  18. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  19. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  20. Perfection of design of soil dams of small hydroelectric power stations

    International Nuclear Information System (INIS)

    Inoyatov, M.B.; Rasulov, S.

    2008-01-01

    The important question connected with building of dams of smallhydroelectric power stations in rock conditions is water filtration throughthe side of dam containing as a rule the alluvial material. This process canbe accompanied by internal erosion long-term exposure of which lead tocarry-over more bigger particles with progressive increasing permeabilitytill catastrophic level. This question authors consider in this article

  1. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  2. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  3. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  4. Economic aspects of hydroelectric power scheme rehabilitation

    International Nuclear Information System (INIS)

    Dupuy, M.

    1991-01-01

    As part of the management of a utility, it is necessary to check, beyond the technical aspect, the economic suitability of deciding whether to perform the maintenance or rehabilitation of an installation. The decision criteria involved are to be found within the framework of the utility's management system itself. After having set out the decision-making process of hydroelectric power station maintenance or rehabilitation, the document goes on to give a description of the economic advantage of such an operation. The latter is determined after having properly defined the overall cost of maintenance or rehabilitation: direct expenses and induced costs, and expected savings: economic performance, short and medium-term reduction of expenses as a result of the profitability and productivity of the rehabilitation. The profitability is calculated as the ratio between the economic balance and the amount of the operation. Productivity means the improvement of the utility's management indicators. The random aspect of savings and a simple method making it possible to integrate them into a calculation is mentioned, as well as the classification and aggregation of various operations of a similar nature that have to come into the budget requirements of the utility. (Author)

  5. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  6. Changes in the state territory, systemic changes, the development of ecological thinking and the issues of the utilisation of hydroelectric power in Hungary

    Directory of Open Access Journals (Sweden)

    HAJDÚ Zoltán

    2012-09-01

    Full Text Available Each big river, including the Danube, makes a single system from their spring to their delta or estuary. Wherever we intervene into the system, this will be necessarily affect the whole of that. Thespillover effects are especially striking in the case of the lower reaches, in the Danube River in the Delta area. The utilisation of the hydroelectric power of the Danube River has been continuously on the agenda in the Hungarian areas since the turn of the 19th and 20th centuries, as an economic, planning, development and thenpolitical and environmental issue. The plans made before the World War I featured hydroelectric plants as the carriers of technical and scientific progress. World War I and the subsequent changes of the state borders swept these plans aside. Between the two world wars, the planning of hydroelectric power stations on the Danube wascontinued within the new state borders, two Hungarian governments and prime ministers of the time were fully committed to the construction of three power plants on the Danube River. After World War II, the hydroelectric plant planned on the Hungarian-Czechoslovakian border and its construction became a basic economic and, from the 1980s, an environmental issue. Finally, only a part of the planned hydroelectric power plant system was constructed, and the issue was not finally closed by specific interpretation of the international law. The Danube Strategy of the European Union, the programmes until 2020, the increase of the role of renewable anergies, the nuclear disaster in Japan, and the interests of international navigation filled the debate with new content. Thepossibility of the construction of hydroelectric power plants on the Danube River was “accidentally” put among the official documents of the government in power since 2010. The government declared it had nothing to do with the plans, and the debate has been going on since then.

  7. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  8. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  9. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  10. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  11. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  12. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  13. Using fire dynamics simulator to reconstruct a hydroelectric power plant fire accident.

    Science.gov (United States)

    Chi, Jen-Hao; Wu, Sheng-Hung; Shu, Chi-Min

    2011-11-01

    The location of the hydroelectric power plant poses a high risk to occupants seeking to escape in a fire accident. Calculating the heat release rate of transformer oil as 11.5 MW/m(2), the fire at the Taiwan Dajia-River hydroelectric power plant was reconstructed using the fire dynamics simulator (FDS). The variations at the escape route of the fire hazard factors temperature, radiant heat, carbon monoxide, and oxygen were collected during the simulation to verify the causes of the serious casualties resulting from the fire. The simulated safe escape time when taking temperature changes into account is about 236 sec, 155 sec for radiant heat changes, 260 sec for carbon monoxide changes, and 235-248 sec for oxygen changes. These escape times are far less than the actual escape time of 302 sec. The simulation thus demonstrated the urgent need to improve escape options for people escaping a hydroelectric power plant fire. © 2011 American Academy of Forensic Sciences.

  14. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  15. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant.

    Science.gov (United States)

    Acakpovi, Amevi; Dzamikumah, Lucky

    2016-12-01

    Occupational risk management is known as a catalyst in generating superior returns for all stakeholders on a sustainable basis. A number of companies in Ghana implemented health and safety measures adopted from international companies to ensure the safety of their employees. However, there exist great threats to employees' safety in these companies. The purpose of this paper is to investigate the level of compliance of Occupational Health and Safety management systems and standards set by international and local legislation in power producing companies in Ghana. The methodology is conducted by administering questionnaires and in-depth interviews as measuring instruments. A random sampling technique was applied to 60 respondents; only 50 respondents returned their responses. The questionnaire was developed from a literature review and contained questions and items relevant to the initial research problem. A factor analysis was also carried out to investigate the influence of some variables on safety in general. Results showed that the significant factors that influence the safety of employees at the hydroelectric power plant stations are: lack of training and supervision, non-observance of safe work procedures, lack of management commitment, and lack of periodical check on machine operations. The study pointed out the safety loopholes and therefore helped improve the health and safety measures of employees in the selected company by providing effective recommendations. The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  16. Testing of an acoustic smolt deflection system, Blantyre hydroelectric power scheme

    International Nuclear Information System (INIS)

    1996-01-01

    The aim of this study was to test the effectiveness of an underwater acoustic barrier as a means of preventing the entry of salmon (Salmo salar) and sea trout (Salmo trutta) smolts and other fish into the water intake of a hydro-electric power (HEP) station. A secondary objective was to measure the injury rate of fish passed through the turbine, so that the risk to any fish that penetrated the acoustic barrier could also be determined. The test site, which was a 575kW Kaplan plant located at Blantyre on the R. Clyde, Lanarkshire, was selected as being representative of run-of-river sites currently being developed under the Government's NFFO (Non-Fossil Fuel Obligation) and SRO (Scottish Renewables Order) schemes. A further objective was to disseminate information arising from the project to the scientific and HEP community. (author)

  17. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  18. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  19. New erection program of the hydroelectric power plant Beznau. Das Neubauprojekt des hydraulischen Kraftwerkes Beznau

    Energy Technology Data Exchange (ETDEWEB)

    Bretscher, B; Hauenstein, W [NOK Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

    1992-02-21

    The projected hydroelectric power plant at Beznau on the Aare river will produce about 43% more electric power than the present hydroelectric power plant. The water level and the buildings in the Aare will remain unchanged, so that the enviromental impact will be relativley slight. The project is in accordance with the building permit so that no adaptations on modifications will be required. (orig.).

  20. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  1. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  2. Aspects of the relations between the hydroelectric constructions and environment

    International Nuclear Information System (INIS)

    Michael, I.

    1993-01-01

    By their dimensions hydroelectric constructions constitute one of the evident examples of man's action upon nature, with favorable as well as unfavorable effects. By using past experience, such effects can be correctly establish and evaluated both by specialists from different fields and by representatives of the local population. The paper proposes several criteria for qualitative characterization of such effects. Some favorable and unfavorable effects of dams, lakes, secondary catchment and derivations are discussed. Also, having in view the water flow distribution which would allow a normal insertion of such construction in the environment, despite of some power production diminish diminishing, two proposals are made concerning possible solutions for secondary catchment and the hydroelectric power stations situated in the upper zones of the rivers. (author). 5 refs

  3. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  4. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  5. Displacement back analysis for a high slope of the Dagangshan Hydroelectric Power Station based on BP neural network and particle swarm optimization.

    Science.gov (United States)

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes.

  6. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  7. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  8. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  9. Electricity Generation Through the Koeberg Nuclear Power Station of Eskom in South Africa

    International Nuclear Information System (INIS)

    Dladla, G.; Joubert, J.

    2015-01-01

    The poster provides information on the process of nuclear energy generation in a nuclear power plant in order to produce electricity. Nuclear energy currently provides approximately 11% of the world’s electricity needs, with Koeberg Nuclear Power Station situated in the Western Cape providing 4.4% of South Africa’s electricity needs. As Africa’s first nuclear power station, Koeberg has an installed capacity of 1910 MW of power. Koeberg’ s total net output is 1860 MW. While there are significant differences, there are many similarities between nuclear power plants and other electrical generating facilities. Uranium is used for fuel in nuclear power plants to make electricity. With the exception of solar, wind, and hydroelectric plants, all others including nuclear plants convert water to steam that spins the propeller-like blades of a turbine that spins the shaft of a generator. Inside the generator coils of wire and magnetic fields interact to create electricity. The energy needed to boil water into steam is produced in one of two ways: by burning coal, oil, or gas (fossil fuels) in a furnace or by splitting certain atoms of uranium in a nuclear energy plant. The uranium fuel generates heat through a controlled fission process fission, which is described in this poster presentation. The Koeberg Nuclear Power Station is a Pressurised water reactor (PWR). The operating method and the components of the Koeberg Power Station are also described. The nuclear waste generated at a nuclear power station is described under three headings— low-level waste, intermediate-level waste and used or spent fuel, which can be solid, liquid or gaseous. (author)

  10. Displacement Back Analysis for a High Slope of the Dagangshan Hydroelectric Power Station Based on BP Neural Network and Particle Swarm Optimization

    Science.gov (United States)

    Liang, Zhengzhao; Gong, Bin; Tang, Chunan; Zhang, Yongbin; Ma, Tianhui

    2014-01-01

    The right bank high slope of the Dagangshan Hydroelectric Power Station is located in complicated geological conditions with deep fractures and unloading cracks. How to obtain the mechanical parameters and then evaluate the safety of the slope are the key problems. This paper presented a displacement back analysis for the slope using an artificial neural network model (ANN) and particle swarm optimization model (PSO). A numerical model was established to simulate the displacement increment results, acquiring training data for the artificial neural network model. The backpropagation ANN model was used to establish a mapping function between the mechanical parameters and the monitoring displacements. The PSO model was applied to initialize the weights and thresholds of the backpropagation (BP) network model and determine suitable values of the mechanical parameters. Then the elastic moduli of the rock masses were obtained according to the monitoring displacement data at different excavation stages, and the BP neural network model was proved to be valid by comparing the measured displacements, the displacements predicted by the BP neural network model, and the numerical simulation using the back-analyzed parameters. The proposed model is useful for rock mechanical parameters determination and instability investigation of rock slopes. PMID:25140345

  11. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  12. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  13. [Effects of the installation of the Rosal hydroelectric power station, Itabapoana River, States of Espírito Santo and Rio de Janeiro, on anophelinae, planorbidae and phlebotominae].

    Science.gov (United States)

    Rezende, Helder Ricas; Sessa, Paulo Augusto; Ferreira, Adelson Luiz; dos Santos, Claudiney Biral; Leite, Gustavo Rocha; Falqueto, Aloísio

    2009-01-01

    The construction of dams usually changes the composition of the fauna within their areas of influence. In the area where the Rosal hydroelectric power station has been installed, in the States of Espírito Santo and Rio de Janeiro, changes to the abundance of anophelinae, planorbidae and phlebotominae were evaluated before (1998-2000) and after (2000-2005) the damming. Nine sample collection points were defined, each represented by a home and its outbuildings, shelters for domestic animals and water collection points within a radius of 150m. One hundred and three adult anophelinae were collected before the damming and 313 afterwards; 200 immature anophelinae before and 708 afterwards; 868 planorbidae before and 486 afterwards; and 2,979 phlebotominae before and 912 afterwards. The vector record, consisting of anophelinae, planorbidae and phlebotominae, shows the potential of this area for transmission of malaria, schistosomiasis and American cutaneous leishmaniasis. However, the environmental changes did not increase the risk of the occurrence of these diseases.

  14. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  15. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  16. Phytoplankton of the Boguchany reservoir in 2016-2017 at the stations in front of the hydroelectric dam

    Directory of Open Access Journals (Sweden)

    M. V. Usoltseva

    2017-12-01

    Full Text Available The species structure and seasonal dynamics of the phytoplankton of the dam area of the Boguchany Reservoir were studied in the first years of operation of the hydroelectric power station in 2016-2017. Two peaks of algal bloom are noted in spring and summer. Mass species were: diatom Stephanodiscus minutulus and dinophyte Gymnodinium baicalense in spring; diatoms Asterionella formosa and Fragilaria crotonensis, blue-green Dolichospermum lemmermannii, D. flosaquae, D. flosaquae f. spiroides and Aphanizomenon flosaquae; green Sphaerocystis planctonica and dinophyte Ceratium hirundinella in summer; diatoms F. crotonensis and A. formosa, cryptophytic Rhodomonas pusilla and Cryptomonas ovata in autumn. The cryptophyte R. pusilla and the Cryptomonas species were dominated under the ice. The maximum number of phytoplankton (9 million cells in liter was recorded in the spring. According to the indixes of saprobity, the purity of water corresponded to II-III quality classes (pure and moderately polluted water.

  17. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  18. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  19. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  20. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  1. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  2. Hydroelectric power: Energy vector for progress and development; Wasserkraft: Energievektor fuer Fortschritt und Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Meclot, B; Dupuy, M; Weis, H; Linari, A; Baril, M; Barlow, M; Cambi, M; Cullen, R; Genier, M; Germeau, J P; Madureira, C; Mellquist, P; Perea, A; Rost, M; Savey, P; Schiller, G; Talhull, A

    1997-11-01

    Hydroelectric power in the UNIPEDE member states has a share of about 18 percent, i.e. slightly less than the world average of 19 percent. Hydroelectric power has good future prospects: It is a renewable energy source and well suited for storage. (orig) [Deutsch] Wasserkraft ist eine Energie, die im Rahmen der von den Mitgliedslaendern der UNIPEDE genutzten Energieerzeugungsarten eine hohe Bedeutung hat. Sie repraesentiert durchschnittlich 18% der erzeugten elektrischen Energie, leicht unterhalb des weltweiten Durchschnitts (19%). Die Merkmale der Wasserkraft verdienen Aufmerksamkeit: Es handelt sich um eine erneuerbare Energie, die in grossen Mengen gespeichert werden kann und in der Energiewirtschaft eine grosse Rolle spielt. (orig.)

  3. Construction and optimization of a power complex with a distributed generation on the basis of renewables and methods of artificial intelligence (on the example of the Republic of Tajikistan

    Directory of Open Access Journals (Sweden)

    Manusov Vadim

    2016-01-01

    Full Text Available In this article the basic principles and classifications of small hydroelectric power stations depending on the power of system in which they work are provided. Especially, in the conditions of Tajikistan when all small hydroelectric power stations in some regions carry out the functions of big hydroelectric power stations. We suggest to use new classification by using function of fuzzy logic. The new concept of a power complex (HUB on the basis of the renewed energy source (RES is also offered.

  4. A contribution to the methods of determining the optimal exploitation of hydraulically related hydroelectric power plants of different owners

    International Nuclear Information System (INIS)

    Gievski, Igor

    2013-01-01

    For the purpose of solving the water-supply and energy-related problems of the city of Skopje, the need has arisen to construct the 'Skopsko Pole' hydro system. The 'Skopsko Pole' hydro system consists of the power plants 'Kozjak', 'SvetaPetka' and 'Matka'. It is envisioned to use the watercourse of the Treska River and has been envisaged as a multipurpose system, that is, as an anti-flood system, system for irrigation of agricultural land and an electricity producer. Certainly, the meeting of the aforementioned needs will depend on the hydrological potential of the Treska River, which is why an exact and detailed review of the hydrological potential of the Treska River is of vital importance. It is a complex task to determine the optimal work of the hydroelectric power plants built along the same river, even if this is about the so-called run-of-the-water hydroelectric power plants, given the different interests of the water consumers of the same watercourse. This problem will become more complicated if one or more (that is, all) hydroelectric power plants have their own accumulative pools. In this case, the question arises of how the waters of each of the accumulations should be used. During this, we need to bear in mind the fact that every release of water from each of the accumulations alters the elevation points of all the hydroelectric power plants on the same watercourse and thus affects their production and eventually the benefit of their work. With the restructuring of the electric energy systems in different countries over the past 20 years, the vertically integrated power plants have been converted into horizontally integrated ones. In many cases, it is different companies that are the electricity producers, the high-voltage electricity transmitters, and the medium- and low-voltage electricity distributors. Some of these companies are private companies, whereas others are state-owned. Such diverse ownership of the power plants, which are by default

  5. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  6. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  7. The impact of a hydroelectric power plant on the sediment load in downstream water bodies, Svartisen, northern Norway.

    Science.gov (United States)

    Bogen, J; Bønsnes, T E

    2001-02-05

    When the Svartisen hydroelectric power plant was put into operation, extensive sediment pollution was observed in the downstream fjord area. This paper discusses the impact of the power plant and the contribution from various sources of sediment. Computation of the sediment load was based on samples collected one to four times per day. Grain size distribution analyses of suspended sediments were carried out and used as input in a routing model to study the movement of sediments through the system. Suspended sediment delivered to the fjord before the power station was constructed was measured as 8360 metric tons as an annual mean for a 12-year period. During the years 1995-1996 when the power plant was operating, the total suspended load through the power station was measured as 32609 and 30254 metric tons, respectively. Grain size distribution analyses indicate a major change in the composition of the sediments from 9% clay before the power plant was operative to 50-60% clay afterwards. This change, together with the increase in sediment load, is believed to be one of the main causes of the drastic reduction in secchi depths in the fjord. The effect of the suspended sediment load on the fjord water turbidity was evaluated by co-plotting secchi depth and power station water discharge. Measurements during 1995 and 1996 showed that at the innermost of these locations the water failed to attain the minimum requirement of 2 m secchi depth. In later years secchi depths were above the specified level. In 1997 and 1998 the conditions improved. At the more distal locality, the conditions were acceptable with only a few exceptions. A routing model was applied to data acquired at a location 2 km from the power station in order to calculate the contributions from various sediment sources. This model indicated that the contribution from reservoir bed erosion dominated in 1994 but decreased significantly in 1995. Future operation of the power station will mostly take place with

  8. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  9. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  10. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  11. Developmental state and perspectives of USSR power stations, espec. nuclear power stations

    International Nuclear Information System (INIS)

    1983-01-01

    According to the resolutions of the 25th and 26th party congresses of the CPSU, the Soviet electric and thermal energy economy envisages as the mainstreams in development: Energy projects based on nuclear fuel, i.e. nuclear power stations (NPS), nuclear heat- and -power stations (NHPS) and nuclear heat stations (NHS); fuel-energy complexes: Ekibastuz, Kansk-Achinsk, West-Siberian complex (Tyumen); power stations utilizing non-conventional regenerative energy sources, i.e. solar, geothermal, MHD power stations. Further down, an overview is given on the developmental perspectives of nuclear-heat and nuclear-power economy and on the development of energy management based on fossil fuels. (orig./UA) [de

  12. Proceedings on the seminar on small hydroelectric installations: Practice report and current development; Beitraege zum Seminar Kleinwasserkraft: Praxis und aktuelle Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This seminar on small hydroelectric installations informs on aspects of construction and administrative aspects. But above all, questions of machinery are dealt with. The book gives an overview of turbine types, topical recent developments in the sector of small hydroelectric power stations, and modern opportunities for fast and inexpensive design of power station components. Beyond the discussion of technical issues, the seminar wants to further contacts between science, turbine manufacturers, consultants and plant operators. (orig.) [Deutsch] Das Seminar Kleinwasserkraft gibt eine Uebersicht ueber bauliche Gestaltung und behoerdliche Aspekte. Vorallem behandelt es aber maschinenbauliche Problemstellungen. Es zeigt einen Ueberblick ueber Turbinentypen, aktuelle Neuentwicklungen im Kleinwassersektor, sowie moderne Moeglichkeiten zum schnellen und preiswerten Design von Kraftwerkskomponenten. Neben dem technischen Teil dient das Seminar auch der Foerderung des Kontakts zwischen Wissenschaft, Turbinenherstellern, Consultants und Anlagenbetreibern. (orig.)

  13. Assessment and statistics of Brazilian hydroelectric power plants: Dam areas versus installed and firm power

    International Nuclear Information System (INIS)

    Caetano de Souza, Antonio Carlos

    2008-01-01

    The Brazilian relief, predominantly composed by small mountains and plateaus, contributed to formation of rivers with high amount of falls. With exception to North-eastern Brazil, the climate of this country are rainy, which contributes to maintain water flows high. These elements are essential to a high hydroelectric potential, contributing to the choice of hydroelectric power plants as the main technology of electricity generation in Brazil. Though this is a renewable source, whose utilized resource is free, dams must to be established which generates a high environmental and social impact. The objective of this study is to evaluate the impact caused by these dams through the use of environmental indexes. These indexes are ratio formed by installed power with dam area of a hydro power plant, and ratio formed by firm power with this dam area. In this study, the greatest media values were found in South, Southeast, and Northeast regions respectively, and the smallest media values were found in North and Mid-West regions, respectively. The greatest encountered media indexes were also found in dams established in the 1950s. In the last six decades, the smallest indexes were registered by dams established in the 1980s. These indexes could be utilized as important instruments for environmental impact assessments, and could enable a dam to be established that depletes an ecosystem as less as possible. (author)

  14. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  15. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  16. Combined solar photovoltaic and hydroelectric pumped storage power plant

    International Nuclear Information System (INIS)

    Gzraryan, R.V.

    2009-01-01

    Combined model of solar photovoltaic and pumped storage stations aimed at power supply for 40 rural houses are considered. The electric circuits of station and their acting regularities are developed and submitted. The both generation curve of photovoltaic station and load curve of electrical customer are considered. The power of hydraulic unit, pumping unit and photovoltaic station are calculated

  17. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  18. Automation of hydro power on the upper Rhine and modernization of a power station at the confluence of the Rhine and Aare rivers; Automatisierung der Wasserwirtschaft am Hochrhein und Modernisierung eines Kraftwerkes am Zusammenfluss von Aare und Rhein

    Energy Technology Data Exchange (ETDEWEB)

    Beltzig, C.; Schlageter, G.

    1996-12-31

    For the first barrage weir after the confluence of the Rhine and Aare rivers, a maximum storage level is determined and set that constitutes an operating optimum and takes the different inflow and outfall volumes as well as existing retention capacities into account. Moreover, the process control system ensures automatic operation of the three engine units of the power station including process control of the barrage weir and the external systems belonging to the Albbruck-Doggern hydroelectric power station on the Rhine (RADAG). (orig./RHM)

  19. Planning of cascade stations on the Maotiao He detailed

    Energy Technology Data Exchange (ETDEWEB)

    Guan, W

    1984-09-20

    Details of the hydroelectric power stations on the Maotiao He cascades and examples of how some problems were resolved begin with a description of the river basin survey for topographical features, hydrometeorological conditions, and geological conditions. The river characteristics survey was the basis for planning the cascade power stations and the selection of installed capacity at each station. The review also covers discharge and flood control planning based on rainfall data and the composition of flood areas. The overall development program emphasizes power generation, but also includes irrigation, industrial water supply, and tourism. 2 figures, 1 table.

  20. Small-scale hydroelectric power plant of Passo do Inferno automation system; Sistema de automatizacao da PCH Passo do Inferno

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Luiz C. Lisboa; Moralles, Reni; Quadros, Carlos A.D.; Martiny, Raul; Moehlecke, Juarez E.; Costa, Nelson D. da; Cesar, Rogerio L.; Santos, Sergio S.; Basei, Eleu Natal [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)

    1993-12-31

    This work introduces the automation system brought into the 1,7 MVA small-scale hydroelectric power plant of Passo do Inferno, state of Rio Grande do Sul, Brazil. The following systems are presented: supervision, security and generation control, as well as the program and the controller. In this work, it is focused the generation control system, as a new outfitted system in small-scale hydroelectric power plants 3 figs.

  1. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  2. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  3. A computer-based system for environmental impact assessment (EIA) applications to energy power stations in Turkey: CEDINFO

    Energy Technology Data Exchange (ETDEWEB)

    Nuriye Peker Say; Muzaffer Yucel; Mehmet Yilmazer [Cukurova University, Adana (Turkey). Department of Landscape Architecture

    2007-12-15

    Environmental impact assessment (EIA) is a tool to enable decision makers to account for the possible effects of a proposed project on the environment and is also a process for collecting the data related to a project design and project area. Different techniques are used for the EIA process. In recent years, including the design and development of databases, classification systems, computer models and expert systems have been used extensively in impact assessment studies. Knowledge-based systems referred to as expert systems and different computer-based systems are an emerging technology in information processing and are becoming increasingly useful tools in different applications areas including EIA studies. Their use for EIA has been quite limited in developing countries, because of the constraints on resources, particularly in expertise and data. In this study, a knowledge-based software CEDINFO developed by authors was introduced. CEDINFO to be used for EIA practices on energy-generating stations was designed based on the legal EIA process in Turkey. According to the EIA Regulation enacted in Turkey in 1993, energy-generating stations (thermal power stations, hydroelectric power stations, nuclear power stations) in different categories require mandatory EIA reports duly approved by The Ministry of Environment and Forestry before their construction. CEDINFO primarily aims to provide educational support for EIA practices and decision-makers on energy-generating stations. 23 refs., 5 figs., 2 tabs.

  4. The micro power station of Verbois; Ouvrage Micro-centrale de Verbois

    Energy Technology Data Exchange (ETDEWEB)

    Quercia, P.; Martinez, J.-L. [Services industriels de Geneve, Service de l' electricite, Geneva (Switzerland)

    2005-07-01

    The policy of the public utilities of the City of Geneva includes the promotion of renewable energy and the conservation of the environment. The erection of the most important hydroelectric power plant in the canton of Geneva at Verbois, on the Rhone River dates back to the years 1938 to 1944. Several retrofits have been made since then, the last dating from 1996 to 1998. In 2000, due to ecological considerations, a fish ladder was added, resulting in a loss of generated power equivalent to a water flow of 2 m{sup 3}/s at a height of 18.35 meters. In order to compensate for this energy loss, a micro hydropower station with a maximum output power of 316 kW was added. It is fitted with a Francis turbine with horizontal axis and fixed opening; the rotation speed is 605 rpm. A reduced power output could be traced back to the deposition of solids on the grids upstream of the water supply duct. The necessary modifications are discussed.

  5. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant

    Directory of Open Access Journals (Sweden)

    Amevi Acakpovi

    2016-12-01

    Conclusion: The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  6. The Trencin water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Trencin water power station. The Trencin water power station was built seven years after the Dubnica nad Vahom water power station started its operation and was the last stage of the first and the oldest derived cascade of water power stations on the Vah River. After completing water power stations at Ladce (1936), Ilava (1946) and Dubnica nad Vahom (1949) and before constructing the Trencin water power station, the whole second derived cascade of water power stations including water power stations at Kostolna, Nove Mesto nad Vahom and Horna Streda was built as soon as possible mainly because the need to get compensation for discontinued electricity supplies as well as energetic coal from the Czech Republic. Hereby, experiences from the construction of previous grades were used, mainly as far as the dimensioning was concerned, as the fi rst installed power stations had, in comparison with the growing requirements on the electricity supplies, very low absorption capacity - only 150 m 3 .s -1 . Thus the Trencin power station (original name was the Skalka power station) was already dimensioned for the same absorption capacity as the cascade located downstream the river, that is 180 m 3 .s -1 . That was related also to growing demands on electricity supplies during the peaks in the daily electric system load diagram, and thus to the transfer from continuous operation of the water power station to semi-peak or even peak performance. According to the standards of power station classification, the Trencin water power station is a medium size, low pressure, channel power station with two units equipped by Kaplan turbines and synchronous hydro-alternators. The water power station installed capacity is 16.1 MW in total and its designed annual production of electrical energy for medium water year is 85,000 MWh, while the average annual production during the last 30 years is 86,252 MWh. Installed unit has a four-blade Kaplan turbine with the diameter

  7. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  8. The Miksova water power station

    International Nuclear Information System (INIS)

    2005-01-01

    This leaflet describes the Miksova water power station. The Miksova water power station is part of the second derived cascade of hydro power stations on the river Vah. It was built at the end of a huge development in Slovak hydro-energy in the late 1950's and the beginning of the 1960's. It is the second water power station on this derived cascade, which is situated downstream the Hricov reservoir and water power station. At the power station, three turbine sets with vertical Kaplan turbines are installed with a total power output of 3 x 31.2 = 93.6 MW. With this power output the Miksova water power station (Miksova I) was the biggest water power station in the Slovak Republic until the construction of Pumping water power station Liptovska Mara. And it is still the biggest channel water power station on the Vah so far. It was put into operation during the period 1963 to 1965. There are three turbine sets with Kaplan turbines from CKD Blansko, with a synchronous hydro-alternator installed in the power station. Their installed capacity is 93.6 MW in total and the projected annual production of electrical energy is 207 GWh. The turbines are fi ve-bladed (on the Hricov and Povazska Bystrica water power stations they are four-bladed) and the impeller wheel has a diameter of 4800 mm. They are designed for extension of the head from 24.1 to 22.21 m and each of them has an absorption capacity of 134 m 3 .s -1 nd a nominal operating speed of 2.08 m 3 .s -1 , runaway speed 4.9 m 3 .s -1 . Each synchronous hydro-alternator has a maximum power output of 31.2 MW, a nominal voltage of 10.5 kV and power factor cos φ of 0.8. Power from the power station is led out through 110 kV switchgear. The water power station operates under automatic turbine mode of operation with remote indication and control from the Dispatch Centre at Vodne elektrarne, in Trencin. From start of operation until the end of 2003 all three turbine sets operated for a total of 450,500 running hours and the

  9. Hydroelectric power in Switzerland: large growth potential by increasing the installed power

    International Nuclear Information System (INIS)

    Schleiss, A.

    2007-01-01

    Due to its important hydroelectric power generation facilities (about 525 plants with a total power of 13,314 MW producing about 35.3 TWh annually) Switzerland plays an important role in the interconnected European power system. Large artificial storage lakes in the Swiss Alps can generate peak power during hours of highest demand: 9700 MW are available from accumulated energy and the total power of pumped-storage facilities amounts to 1700 MW. The latter allow refilling the reservoirs at periods of low power demand and generating power at periods of peak demand. In the case of favorable conditions, the yearly average power production could be increased by 6% and the production during the winter period (October to March) by 20% by the year 2020. However, looking forward to the year 2050, the annual production is expected to decrease by 3% despite a possible extension of hydropower. This decrease is due to the enforcement of the minimum residual water flow rates required by a new legislation to protect the rivers. The enforcement is due at latest when the present licenses for water utilization expire. On the other hand, the installed (peak) power might be further increased by 50% by retrofitting the existing installations and constructing the pumped-storage plants currently at the planning stage

  10. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  11. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  12. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  13. Kadambarai: a boon for power availability and operations in Tamil Nadu

    Energy Technology Data Exchange (ETDEWEB)

    Arokiaswamy, N S.S.

    1984-04-01

    The Kadambarai pumped storage hydroelectric project located in the Annamali hills of the Coimbatore distict of India is described. The purpose of the project is to convert all of the available but unutilized power in the grid during low demand periods, e.g., between 10 pm and 6 am, into peaking power needed during the daytime. The water from the upper Aliyar Reservoir located below the power station is pumped into the Kadambarai dam. The water thus stored will run the same pump turbines generating peaking power neded to avoid load shedding and to run the pumpsets. The Kadambarai project is due to become operational with the commissioning of the first 100 MW machine in 1985. With the commissioning of the other 3 machines of 1987, the power station will become the largest single hydroelectric power station in the Tamil Nadu grid.

  14. Power station instrumentation

    International Nuclear Information System (INIS)

    Jervis, M.W.

    1993-01-01

    Power stations are characterized by a wide variety of mechanical and electrical plant operating with structures, liquids and gases working at high pressures and temperatures and with large mass flows. The voltages and currents are also the highest that occur in most industries. In order to achieve maximum economy, the plant is operated with relatively small margins from conditions that can cause rapid plant damage, safety implications, and very high financial penalties. In common with other process industries, power stations depend heavily on control and instrumentation. These systems have become particularly significant, in the cost-conscious privatized environment, for providing the means to implement the automation implicit in maintaining safety standards, improving generation efficiency and reducing operating manpower costs. This book is for professional instrumentation engineers who need to known about their use in power stations and power station engineers requiring information about the principles and choice of instrumentation available. There are 8 chapters; chapter 4 on instrumentation for nuclear steam supply systems is indexed separately. (Author)

  15. Power stations

    International Nuclear Information System (INIS)

    Cawte, H.; Philpott, E.F.

    1980-01-01

    The object is to provide a method of operating a dual purpose power station so that the steam supply system is operated at a high load factor. The available steam not required for electricity generation is used to provide process heat and the new feature is that the process plant capacity is determined to make the most economic use of the steam supply system, and not to match the passout capacity of the turbine of the turbogenerator. The product of the process plant should, therefore, be capable of being stored. A dual-purpose power station with a nuclear-powered steam source, turbogenerating means connected to the steam source and steam-powered process plant susceptible to wide variation in its rate of operation is described. (U.K.)

  16. Power improvement and modernization of small scale hydroelectric power plants in Brazil; Recapacitacao e modernizacao de PCH`s no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Nascimento, Jose Guilherme Antioga do [Departamento Nacional de Aguas e Energia Eletrica (DNAEE), Brasilia, DF (Brazil); Amaral, Cristiano Abijaode [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1995-12-31

    Several small scale hydroelectric power plants existing in Brazil have been abandoned due to recent projects of large scale units, however, some of than still present workable conditions. Due to that fact, several Brazilian electric power companies have been considering the possibility of modernizing such old units as an alternative for regional electric power generation. This work discusses the above mentioned issues 3 refs., 5 figs., 9 tabs.

  17. Local society and nuclear power stations

    International Nuclear Information System (INIS)

    1984-02-01

    This report was made by the expert committee on region investigation, Japan Atomic Industrial Forum Inc., in fiscal years 1981 and 1982 in order to grasp the social economic influence exerted on regions by the location of nuclear power stations and the actual state of the change due to it, and to search for the way the promotion of local community should be. The influence and the effect were measured in the regions around the Fukushima No. 1 Nuclear Power Station of Tokyo Electric Power Co., Inc., the Mihama Power Station of Kansai Electric Power Co., Inc., and the Genkai Nuclear Power Station of Kyushu Electric Power Co., Inc. The fundamental recognition in this discussion, the policy of locating nuclear power stations and the management of regions, the viewpoint and way of thinking in the investigation of the regions where nuclear power stations are located, the actual state of social economic impact due to the location of nuclear power stations, the connected mechanism accompanying the location of nuclear power stations, and the location of nuclear power stations and the acceleration of planning for regional promotion are reported. In order to economically generate electric power, the rationalization in the location of nuclear power stations is necessary, and the concrete concept of building up local community must be decided. (Kako, I.)

  18. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  19. Experience in using a multilevel model of the boundary layer for estimating changes in microclimatic characteristics in the region of construction of the Adychan and middle Enisei hydroelectric stations

    International Nuclear Information System (INIS)

    Kondratyuk, T.P.; Shklyarevich, O.B.

    1993-01-01

    The results of estimating the impact of artificial water bodies in regions of construction of hydroelectric stations on the micro- and mesoclimatic characteristics of the surrounding territory are given

  20. Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility.

  1. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  2. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  3. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  4. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  5. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  6. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  7. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  8. Some retrofit considerations for revitalizing and upgrading the Oji-River coal-fired thermal power station for service in 21st century Nigeria

    Energy Technology Data Exchange (ETDEWEB)

    Oguejofor, G.C. [Nnamdi Azikiwe University, Awka (Nigeria). Faculty of Engineering & Technology, Dept. of Chemical Engineering

    2003-02-01

    The aim of this article is to show that in the context of sustainable development, coal and its downstream power generation industry could complement petroleum and hydroelectric industries in the national power generation scheme. The continued utilization of coal in power generation schemes in the world as well as environmental pollution caused by other fossil fuels were examined. These were presented as justifications for the proposed reintegration of coal as a complement to hydropower and oil/gas sources of electric energy in Nigeria. The scheme of power generation in the Oji-River thermal station was reviewed to enhance the appreciation of the retrofit models to be presented for the revitalization of the plant. Subsequently, two sustainable development retrofit models were considered for the revitalization of the Oji-River thermal power station and enhanced industrial civilization of the Oji neighbourhood. To ensure self-sufficiency, the paper shows how the two retrofit models depend on abundant locally available resources, namely, coal, limestone, water and air.

  9. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  10. Hydroelectric power plant project on the Coulonge River: Report of inquiry and public hearing

    International Nuclear Information System (INIS)

    1992-01-01

    A hydroelectric power plant is proposed for the Coulonge River, a tributary of the Ottawa River in Quebec. Water would be taken from the river through a 609 m tunnel to the plant, which would contain two Francis turbines with a total installed power of 16.2 MW operating under a net head of 43 m and a water flow rate of 21.5 m 3 /s. Other works would be necessary upstream for controlling flow and protecting the intake. Total cost for the two-year construction project is estimated at $28 million and annual revenues are forecast at $6 million. An inquiry and public hearing were held to consider the biophysical, social, economic, and cultural impacts of the proposed hydroelectric project. Results of the hearing are summarized in such areas as legal aspects, environmental quality, water rights, land use, job creation, effects on tourism and recreation, effects on wildlife, water level fluctuations, water quality, and safety. The economic justification for the project is discussed with reference to electricity demand, economic viability, utilization factors, and policies that favor construction of small-scale hydroelectric plants. The project was not found to bring sufficient benefits to the region in which it was to be situated and would not be authorized unless Hydro-Quebec tariff policy with respect to small hydro plants was modified and unless the project sponsor compensates the regional municipality. 13 refs., 11 figs., 4 tabs

  11. Recuperação em área de empréstimo usada para construção de usina hidrelétrica Recovery of nativa area used for construction of hydroelectric power station

    Directory of Open Access Journals (Sweden)

    Marlene C. Alves

    2012-08-01

    Full Text Available A recuperação de áreas de empréstimo usada para construção de hidrelétricas é um processo lento que requer o uso de plantas de cobertura, como fonte de matéria orgânica e a aplicação de nutrientes e corretivos como condicionadores dos atributos do solo. Portanto, objetivou-se, com este trabalho, estudar a recuperação de atributos físicos do subsolo de um Latossolo Vermelho distrófico, utilizado no terrapleno e fundação da Usina Hidrelétrica de Ilha Solteira, SP. O delineamento utilizado foi em blocos casualizados com oito tratamentos e quatro repetições. A pesquisa foi implantada em 1992. Os tratamentos se constituíram do uso de adubos verdes, braquiária e correção do solo. Após 13 anos foram avaliados: porosidade total do solo, macroporosidade, microporosidade, densidade do solo, estabilidade de agregados, resistência do solo à penetração, teor de matéria orgânica e produção de matéria seca da braquiária. Os tratamentos adotados estão recuperando, de forma lenta, os atributos físicos do subsolo exposto. Os efeitos da recuperação do solo estão atingindo a profundidade de 0-0,10 m.The recovery of native area used in hydroelectric power station construction is a slow process, and it requires the use of covering plant as a source of organic matter, application of nutrients and amendments as soil conditioner. Thus, this study has the objective to study the recovery of physical attribute of subsoil in a distrophic Red Latosol, used in the embankment and foundation of Hydroelectric Power Station, Ilha Solteira, São Paulo, Brazil. The design used was randomized blocks with eight treatments and four replications. The research started in 1992. The treatments consisted of green manure, pasture and soil amendment. After 13 years, total porosity, macroporosity, microporosity, bulk density, aggregate stability, resistance to penetration, organic matter of soil and dry matter of pasture production were evaluated. The

  12. Have Norwegian producers of hydroelectric power wasted the water?

    International Nuclear Information System (INIS)

    2003-01-01

    Norwegian producers of hydroelectric power have been criticized for having exported power to Sweden during the autumn and winter 2003/2004. As this analysis shows, although the reservoir level in Norway was below normal in October already, the negative deviation from the normal reservoir level was even greater in Sweden till the end of the year. Also when the magnitude of the reserve is measured relative to the number of weeks with normal winter production for which it lasts, the situation was worse in Sweden than in Norway. After New Year the deviation from the normal reservoir level has been much the same in the two countries and has changed in parallel. During this period the exchange between the two countries has approximately balanced and the power flow from Sweden to Norway has grown gradually. With this as a background, there is no basis for asserting that the Norwegian producers have managed the water resources in an irresponsible way. In general, the power flow and the water resource management in the two countries appear reasonable considering the water influx and the prices. Different market imperfections may nevertheless have rendered the water resource management socially less then optimal.

  13. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  14. Beaver Valley Power Station and Shippingport Atomic Power Station. 1984 Annual environmental report, radiological. Volume 2

    International Nuclear Information System (INIS)

    1985-01-01

    This report describes the Radiological Environmental Monitoring Program conducted during 1984 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station. The Radiological Environmental Program consists of on-site sampling of water and gaseous effluents and off-site monitoring of water, air, river sediments, soils, food pathway samples, and radiation levels in the vicinity of the site. This report discusses the results of this monitoring during 1984. The environmental program outlined in the Beaver Valley Power Station Technical Specifications was followed throughout 1984. The results of this environmental monitoring program show that Shippingport Atomic Power Station and Beaver Valley Power Station operations have not adversely affected the surrounding environment. 23 figs., 18 tabs

  15. Spatial and temporal abundance of three sylvatic yellow fever vectors in the influence area of the Manso hydroelectric power plant, Mato Grosso, Brazil.

    Science.gov (United States)

    Ribeiro, A L M; Miyazaki, R D; Silva, M; Zeilhofer, P

    2012-01-01

    Human biting catches of sylvatic yellow fever (SYF) vectors were conducted at eight stations in the influence area of the Manso hydroelectric power plant (Central Brazil) in sampling campaigns every 2 mo from July 2000 to November 2001. In total, 206 individuals were captured and classified as one of three species important for the transmission of SYF in Mato Grosso state: Haemagogus (Haemagogus) janthinomys (Dyar, 1921); Haemagogus (Conopostegus) leucocelaenus (Dyar & Shannon, 1924); and Sabethes (Sabethoides) chloropterus (Humboldt, 1819). The highest vector abundance was observed during the rainy season (November through March) and SYF vectors were present in all sampling points throughout the year, mainly in riparian and shadowed transitional forests at shadowed ramps.

  16. Tobruk power station

    Energy Technology Data Exchange (ETDEWEB)

    Boergardts, B

    1978-01-01

    In February of 1975, the Electricity Corporation Benghazi (ECB) awarded a contract for the construction of a turnkey power station and seawater desalination plant in Tobruk, Libya to a consortium under the leadership of BBC Mannheim. This power station has an output of 129 MW and supplies about 24,000 m/sup 3/ of drinking water daily. It went into operation in 1977, two and a half years after the contract was awarded.

  17. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  18. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  19. Beaver Valley Power Station and Shippingport Atomic Power Station. 1977 annual environmental report: radiological. Volume 2

    International Nuclear Information System (INIS)

    1978-01-01

    The environmental monitoring conducted during 1977 in the vicinity of the Beaver Valley Power Station and the Shippingport Atomic Power Station is described. The environmental monitoring program consists of onsite sampling of water, gaseous, and air effluents, as well as offsite monitoring of water, air, river sediments, and radiation levels in the vicinity of the site. The report discusses releases of small quantities of radioactivity to the Ohio River from the Beaver Valley Power Station and Shippingport Atomic Power Station during 1977

  20. West Kootenay Power Ltd. : Application to sell its hydroelectric generation assets : Decision

    International Nuclear Information System (INIS)

    Ostergaard, P.; Bradley, P.G.; Clemenhagen, B.L.

    2001-01-01

    An investor-owned electric utility providing wholesale and retail service in the West Kootenay and South Okanagan regions of British Columbia, West Kootenay Power Ltd. (WKP) sought the approval from the British Columbia Utilities Commission to sell the four hydroelectric power plants and related facilities to Kootenay River Power Corporation (KRP), and for the purchase by WKP of the output of these plants under a 60-year power purchase agreement. The four hydroelectric plants have a combined rated capacity of approximately 214 MW. Most of the energy and capacity needs of WKP are met via power purchase contracts and agreements, as winter peak loads approach 700 MW. As a result of share purchases, KRP would be 50 per cent owned by each of a provincial Crown Corporation, Columbia Power Corporation (CPC) and a wholly-owned subsidiary of the Columbia Basin Trust (CBT), CBT Energy Inc., if the transactions are allowed to proceed. Three principal agreements are of interest: the Asset Transfer Agreement (ATA), the Share Purchase Agreement (SPA), and the Power Purchase Agreement (PPA). During the review process, two main issues warranted special consideration: the treatment of the proceeds of the sale of assets, and the statutory parameters used by the Commission for the adjudication of the Application. The Application was submitted March 22, 2001, and the public hearing process began May 29, 2001. This Application is unique, in that it contains three agreements that would each require a separate review, but WKP requested that the agreements be considered in their aggregate. The Commission complied, and decided to deny the Application. Unless the terms of the sale are restructured, the transfer of assets to Kootenay River Power Corporation will not be approved by the Commission. Within one month of the date of this decision, WKP is to notify the Commission of its intentions, since it had signified that it would not proceed with the sale unless WKP shareholder receives 100

  1. 20 years of power station master training

    International Nuclear Information System (INIS)

    Schwarz, O.

    1977-01-01

    In the early fifties, the VGB working group 'Power station master training' elaborated plans for systematic and uniform training of power station operating personnel. In 1957, the first power station master course was held. In the meantime, 1.720 power station masters are in possession of a master's certificate of a chamber of commerce and trade. Furthermore, 53 power station masters have recently obtained in courses of the 'Kraftwerksschule e.V.' the know-how which enables them to also carry out their duty as a master in nuclear power stations. (orig.) [de

  2. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    International Nuclear Information System (INIS)

    Jidin, Razali; Othman, Bahari

    2013-01-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  3. Output improvement of Sg. Piah run-off river hydro-electric station with a new computed river flow-based control system

    Science.gov (United States)

    Jidin, Razali; Othman, Bahari

    2013-06-01

    The lower Sg. Piah hydro-electric station is a river run-off hydro scheme with generators capable of generating 55MW of electricity. It is located 30km away from Sg. Siput, a small town in the state of Perak, Malaysia. The station has two turbines (Pelton) to harness energy from water that flow through a 7km tunnel from a small intake dam. The trait of a run-off river hydro station is small-reservoir that cannot store water for a long duration; therefore potential energy carried by the spillage will be wasted if the dam level is not appropriately regulated. To improve the station annual energy output, a new controller based on the computed river flow has been installed. The controller regulates the dam level with an algorithm based on the river flow derived indirectly from the intake-dam water level and other plant parameters. The controller has been able to maintain the dam at optimum water level and regulate the turbines to maximize the total generation output.

  4. An Implementation of Estimation Techniques to a Hydrological Model for Prediction of Runoff to a Hydroelectric Power-Station

    Directory of Open Access Journals (Sweden)

    Magne Fjeld

    1981-01-01

    Full Text Available Parameter and state estimation algorithms have been applied to a hydrological model of a catchment area in southern Norway to yield improved control of the household of water resources and better economy and efficiency in the running of the power station, as experience proves since the system was installed on-line in the summer of 1978.

  5. The adventure of hydroelectricity must continue

    International Nuclear Information System (INIS)

    Gravel, C.

    1997-01-01

    An interview with Andre Caille, president and CEO of Hydro-Quebec was presented. The interview focussed on the hydroelectric potential of Hydro-Quebec and open access to the American wholesale market. Hydro-Quebec has the capability to produce 160 to 170 terawatt hours of energy per year which is enough to meet all of Quebec''s needs and to export 12 to 15 per cent. According to M. Caille, research in the field of superconductivity would significantly benefit Hydro-Quebec, since the utility is responsible for 107,000 kilometers of transmission lines. If transmission line losses along those lines could be reduced, power stations could be built even farther from markets. With respect to pricing, Hydro-Quebec continues to sell electricity at regulated prices in Quebec, however, export prices to the U.S. are market driven

  6. Simulation of the transient processes of load rejection under different accident conditions in a hydroelectric generating set

    Science.gov (United States)

    Guo, W. C.; Yang, J. D.; Chen, J. P.; Peng, Z. Y.; Zhang, Y.; Chen, C. C.

    2016-11-01

    Load rejection test is one of the essential tests that carried out before the hydroelectric generating set is put into operation formally. The test aims at inspecting the rationality of the design of the water diversion and power generation system of hydropower station, reliability of the equipment of generating set and the dynamic characteristics of hydroturbine governing system. Proceeding from different accident conditions of hydroelectric generating set, this paper presents the transient processes of load rejection corresponding to different accident conditions, and elaborates the characteristics of different types of load rejection. Then the numerical simulation method of different types of load rejection is established. An engineering project is calculated to verify the validity of the method. Finally, based on the numerical simulation results, the relationship among the different types of load rejection and their functions on the design of hydropower station and the operation of load rejection test are pointed out. The results indicate that: The load rejection caused by the accident within the hydroelectric generating set is realized by emergency distributing valve, and it is the basis of the optimization for the closing law of guide vane and the calculation of regulation and guarantee. The load rejection caused by the accident outside the hydroelectric generating set is realized by the governor. It is the most efficient measure to inspect the dynamic characteristics of hydro-turbine governing system, and its closure rate of guide vane set in the governor depends on the optimization result in the former type load rejection.

  7. Torness: proposed nuclear power station

    International Nuclear Information System (INIS)

    Anon.

    1979-01-01

    The need for and desirability of nuclear power, and in particular the proposed nuclear power station at Torness in Scotland, are questioned. Questions are asked, and answered, on the following topics: position, appearance and cost of the proposed Torness plant, and whether necessary; present availability of electricity, and forecast of future needs, in Scotland; energy conservation and alternative energy sources; radiation hazards from nuclear power stations (outside, inside, and in case of an accident); transport of spent fuel from Torness to Windscale; radioactive waste management; possibility of terrorists making a bomb with radioactive fuel from a nuclear power station; cost of electricity from nuclear power; how to stop Torness. (U.K.)

  8. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  9. [Limnetic zooplankton run-off a high-head dam and their fate in a river with high current velocity (case of the Krasnoiarsk hydroelectric power station on the Yenisei river].

    Science.gov (United States)

    Dubovskaia, O P; Gladyshev, M I; Makhutova, O N

    2004-01-01

    The vertical distribution of net zooplankton in head-water of Krasnoyarsk hydroelectric power station and its horizontal distribution in the tail-water were studied during two years in winter and summer seasons. In order to distinguish living and dead individuals the special staining was used. It was revealed that on average 77% of living plankton pass through high-head dam with deep water scoop to the tailwater. While passing through dam aggregates some individuals of the reservoir plankton are traumatized and die, that results in some increase of portion of dead individuals in the tail water near dam (from 3 to 6%). Alive zooplankton passed through the dam aggregates is eliminated under the Upper Yenisei highly turbulent conditions. There is approximately 10% of it in 32 km from the dam if compare with biomass in 20-40 m layer of reservoir, the portion of dead increases to 11%. The biomass of zooplankton suspended in the water column of the tail-water sometimes increases (till > 1 g/m3) due to large Copepoda Heteroscope borealis, which inhabits near-bottom and near-shore river zones and can be found in the central part of the river during reproductive period. Limnetic zooplankton from the reservoir cannot be considered as important food for planktivores in the tail-water.

  10. 'Matka 2' Hydroelectric Power Plant slip in the chain hydro energetic objects of the Treska River

    International Nuclear Information System (INIS)

    Danevski, Stavre

    2004-01-01

    The paper deals with the project for rational use of the Treska River. The concept of this project is utilization of the hydro-power potential of the Treska River through the subsystem 'Kozjak-Matka' which encompasses realization of three cascade hydroelectric power plants. The proposed and accepted design concepts of the machine hall and plant facilities in HPP 'St. Petka' (formerly named HPP Matka 2) are presented

  11. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  12. Discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report contains details of the technologies used at many nuclear power stations to treat and control radioactive discharges and gives, where information was available, details of discharges and authorised discharge limits. (author)

  13. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  14. Fire protection concept for power stations

    International Nuclear Information System (INIS)

    Zitzmann, H.

    The author shows how a systematic approach permits the design of a fire-protected power station. The special conditions of an individual power station are here treated as marginal conditions. The article describes how the concept is realized in the completed power station, taking account of the information provided by fire statistics. (orig.) [de

  15. Small hydroelectric power development in India: a profile

    International Nuclear Information System (INIS)

    Bhattacharya, Partha

    1993-01-01

    Small hydroelectric power plants (SHPs) have a definite role to play in the contemporary energy scenario generally as a source for supplementing the electrical energy production and particularly in remote rural areas in meeting the energy requirements of isolated communities. SHPs practically do not produce any adverse impact.However, their success depends on the ingenuity of the planners and the designers, and more importantly the convection. Another dimension to the success is the participation and involvement of the beneficiaries of the project which are more relevant for the microhydro electric schemes in the remote areas. The major factor that influences the commercial success of the SHP is marketing. It should be given due emphasis. This necessitates the SHP development activities to be more pragmatic and relevant to the society needs; an approach which is programme-based, rather than a project-oriented, is needed. (author). 4 refs

  16. Periodical inspection in nuclear power stations

    International Nuclear Information System (INIS)

    1986-01-01

    Periodical inspection is presently being made of eight nuclear power plants in nuclear power stations. Up to the present time, in three of them, failures as follows have been observed. (1) Unit 3 (PWR) of the Mihama Power Station in The Kansai Electric Power Co., Inc. Nineteen heat-transfer tubes of the steam generators were plugged up due to failure. A fuel assembly with a failed spring fixture and in another the control-rod cluster with a failed control rod fixture were replaced. (2) Unit 2 (PWR) of the Oi Power Station in The Kansai Electric Power Co., Inc. Eight heat-transfer tubes of the heat exchangers were plugged up due to failure. (3) Unit 6 (BWR) of the Fukushima Nuclear Power Station I in The Tokyo Electric Power Co., Inc. A fuel assembly with leakage was replaced. (Mori, K.)

  17. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  18. The winning cards of small-scale hydroelectric power in the prevention of greenhouse effect

    International Nuclear Information System (INIS)

    Chabot, B.

    1991-01-01

    Among global environment problems, the risk of global warming is one of the most important. This risk and the associated climatic or socio-economic disorders are in relationships with the growth of greenhouse gases content in the atmosphere, connected with massive fossil fuels uses. This paper presents the advantages of small-scale hydroelectric power, often ignored, which can be a substitution energy source. 14 refs., 4 figs

  19. Hydroelectric power development and the ice regime of inland waters: A northern community perspective

    International Nuclear Information System (INIS)

    Gerard, R.

    1989-03-01

    Inland waters play a vital role in the life of the many small northern communities which depend in large measure on the provisions of the natural environment for their sustenance. These communities are therefore particularly vulnerable to changes in the ice regime of these waters, especially changes that are irregular. However, the north is also the site of much of Canada's hydroelectric power development and potential, developments that have a major influence on the ice regime of effected waters. As a contribution to the background information required for the necessary discussions and negotiations associated with such developments, the various aspects of the natural ice regime, the possible effects of hydroelectric development and operation on this regime, and its consequences, are briefly reviewed. The emphasis has been placed on changes that will likely be of most significance to northern communities in the bedrock-controlled country of the western Canadian Shield. The major direct, and in some circumstances life-threatening, impact of changes to the ice regime is on trafficability of the iceways that play such a vital role in the life of the communities. Hence particular emphasis has been placed on this aspect and on the formation of the slush and thin ice conditions that are the bane of over-ice travel and that are subject to unexpected changes by hydroelectric development and operation. To place these changes and their effects in some perspective, the nature of a hydroelectric development is also briefly described and an effort made to indicate the large costs incurred if these developments are restrained in their operation to avoid or mitigate some of the effects on the ice regime. 31 refs., 57 figs., 1 tab

  20. Feasibility study on the demonstrative test on the hybrid mini hydroelectric power generation technology. 2; Hybrid gata mini suiryoku hatsuden gijutsu ni kakawaru jissho shiken kanosei chosa. 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    A study was made for the purpose of electrification of unelectrified zones of the mountainous areas in developing countries using extremely small hydroelectric power facilities. The target for this project is a development of a micro hydroelectric power system with a size of about 5kW, which is estimated regarding that 1 village has 80 houses and each house needs electricity of 60W. In the study, the low-head system using a weir of irrigation channels in Subang pref. of West Java state was selected by the evaluation of access, stability of flow rate, natural conditions, etc. The hydroelectric power plant is of a flow-in method in which water is taken from the left bank and is injected/discharged to the downstream of the left bank. As the hybrid complementary power source, hybrid battery with a two-hour charging time at peak and a capacity of 3.5kWh was considered. When estimating the construction cost of the hybrid micro hydroelectric power system and equalizing by durable years, the operational cost per kW is 15 times higher than the benefits which local people receive. It was judged to be difficult to say that the micro hydroelectric power system is economically feasible. It was predicted that the financial profit during the demonstrative test is good, according to a trial calculation of income from power rates and the operational cost. 18 refs., 90 figs., 53 tabs.

  1. Combining the Power of Wind and Water in Quebec

    Energy Technology Data Exchange (ETDEWEB)

    Richard, D.

    2007-07-01

    Wind varies and is impossible to store, major factors that have curbed and continue to curb the development of wind power. Hydroelectric generating stations with reservoirs, on the other hand, are quite capable of adjusting their output and can thus buffer fluctuations in consumption or in the output of other generating facilities on the grid. Combining wind power and hydropower thus involves using hydroelectric generating stations to offset the intermittent nature of wind power. The consumer, however, does not automatically reap the benefits of this complementarity. To achieve this, Quebec has implemented a 1,000-MW balancing agreement between the hydropower producer and the electricity distributor, which has signed wind power purchase agreements. The balancing agreement establishes two charges: one based on firming capacity provided by the producer and another linked to errors in the forecast of wind power generation that the distributor makes each day. This structure compensates the producer for the reduced margin of flexibility it has to engage in energy trading. (auth)

  2. [The assessment of the general functional status and of the psychosomatic complaints of workers at hydroelectric power plants].

    Science.gov (United States)

    Danev, S; Dapov, E; Pavlov, E; Nikolova, R

    1992-01-01

    Evaluation of the general functional status and psychosomatic complaints of 61 workers from the hydroelectric power stations is made. The following methods are used: 1. Assessment of the general functional state, by means of computer analysis of the cardiac variability, analysing the changes in the values of the following indices: average value of the cardiac intervals (X), their standard deviation (SD), coefficient of variation (CV), amplitude of the mode (AMO), index of stress (IS), index of the vegetative balance (IVB), homeostatic index (HI). The last 3 indices serve for determination of the complex evaluation of chronic fatigue and work adaptation (ChFWA). 2. Evaluation of the psychosomatic complaints, by the use of a questionnaire for the subjective psychosomatic complaints. 3. Studying the systolic and diastolic blood pressure. The average values received in workers from HPS were compared with the average values of the population of the country and with the average values of a similar working activity of a group of operators from the thermal power station HPS. In conclusion it could be noted that concerning ChFWA the received values in workers from HPS are not more unfavourable generalized values from that measured in workers, occupied with similar type of work in other industrial branches of the country. However, they are with more unfavourable data in comparison with the workers from HPS. The subjective evaluation of the operators concerning their psychic and body health status is moderately worse, both in comparison with the values of the index for the country, and in comparison with those of the operators from HPS.

  3. Decentralized electrification by small-scale hydraulic stations : a viable solution in mountainous regions

    International Nuclear Information System (INIS)

    Dahman Saidi, A.

    1998-01-01

    The installation of a small-scale hydroelectric generating station to supply electricity to the small community of Takordmi in Morocco was described. The community of Takordmi consists of 32 households located in the remote mountainous region of Morocco. Takordmi was without electrical power until 1992 when a small 15 kW Pelton turbine was installed to supply electricity to the residents. Water to power the turbine generator was supplied by a small stream with an output of 4 to 8 liters per second and a head of 535 meters. Since the unit was installed, the mean monthly consumption of the community has been only 115 kWh, which averages to 4 kWh per household. The success of the Takordmi project has prompted the electrification of several other small communities in the remote regions of Morocco either by similar micro-hydroelectric stations or by photovoltaic cells. This project, funded by the Republic of Austria, demonstrates that it is feasible to provide electricity to remote rural communities by using local sources of power. 3 figs

  4. Occupational allergy after exposure to caddis flies at a hydroelectric power plant.

    Science.gov (United States)

    Kraut, A; Sloan, J; Silviu-Dan, F; Peng, Z; Gagnon, D; Warrington, R

    1994-01-01

    A cross sectional survey was conducted in a hydroelectric power plant in which the workforce was exposed to large numbers of caddis flies. 28 of 57 employees participated. About 50% of the participants reported work related eye, nose, and sinus symptoms and wheezing. Working in locations with greater exposure to caddis flies was significantly associated with work related symptoms. 17 workers (61%) were skin prick positive to a laboratory prepared caddis fly antigen (LCFA) made from the remains of caddis flies present in the plant and 11 (39%) had positive reactions to a commercial caddis fly antigen (CCFA). Workers stationed in heavily exposed areas were 3.7 times as likely to have a positive response to the LCFA (p = 0.009) and 5.3 times as likely to have a positive response to the CCFA (p = 0.036). 13 (46%) of survey respondents reported three or more work related symptoms. 10 (91%) CCFA positive workers reported three or more work related symptoms. Pulmonary function studies revealed slight, but not significantly decreased forced vital capacity (FVC), forced expiratory volume in one second (FEV1), and FEV1/FVC ratios in workers who were skin test positive to either caddis fly preparation when compared with those who were negative. One worker who was skin test positive to both antigens had a cross shift fall in FEV1 of 20% predicted. Occupational allergy to caddis flies proved to be a significant health problem at this work site. PMID:8044233

  5. The status and prospects for the fossil-fired and nuclear power industry in Japan

    International Nuclear Information System (INIS)

    Miyahara, S.

    1994-01-01

    Power plant capacity in Japan amounts to about 200 GW, of which 180 GW belong to the electricity supply industry. 60% are installed in fossil-fired power stations, 19% in nuclear power stations and 21% in hydro-electric power stations. Key engineering techniques for power production from fossil fuels are supercritical steam conditions and combined cycle power plant technology. Crucial points for nuclear power generation are the development of the advanced light water reactor, the commericialization of the fast breeder reactor and the installation of a closed nuclear fuel cycle. (orig.) [de

  6. Seasonal variation in plasma nonesterified fatty acids of Lake Sturgeon (Acipenser fulvescens) in the vicinity of hydroelectric facilities

    International Nuclear Information System (INIS)

    McKinley, R.S.; Power, G.; Singer, T.D.; Ballantyne, J.S.

    1993-01-01

    To establish the effects of hydroelectric generation on the health of lake sturgeon (Acipenser fulvescens), seasonal variations in plasma nonesterified fatty acids (NEFAs) upstream and downstream from hydroelectric stations were measured over a 2-y period. Plasma NEFA profiles were also compared up- and downstream of the stations for differences in utilization of individual NEFA species as substrates for lipid oxidation. Significantly higher levels of total plasma NEFA were found in lake sturgeon upstream (2355 ± 395.9 nmole/ml) compared with those downstream (798 ± 133.5 nmole/ml) of the generating stations during the spring. The NEFA profiles for several key fatty acid species differed significantly among seasons up- and downstream of the facilities. In particular, during spring and summer, the levels of oleic acid (18:1n9) were highest upstream of the stations and levels of a polyunsaturated fatty acid, docosahexaenoic acid (22:6n3), were higher below rather than above the stations. The differences in plasma NEFA concentration may be attributed to altered nutritional status due to the varying flow regime located downstream of the hydroelectric stations. 33 refs., 4 figs., 1 tab

  7. Space Station power system issues

    International Nuclear Information System (INIS)

    Giudici, R.J.

    1985-01-01

    Issues governing the selection of power systems for long-term manned Space Stations intended solely for earth orbital missions are covered briefly, drawing on trade study results from both in-house and contracted studies that have been conducted over nearly two decades. An involvement, from the Program Development Office at MSFC, with current Space Station concepts began in late 1982 with the NASA-wide Systems Definition Working Group and continued throughout 1984 in support of various planning activities. The premise for this discussion is that, within the confines of the current Space Station concept, there is good reason to consider photovoltaic power systems to be a venerable technology option for both the initial 75 kW and 300 kW (or much greater) growth stations. The issue of large physical size required by photovoltaic power systems is presented considering mass, atmospheric drag, launch packaging and power transmission voltage as being possible practicality limitations. The validity of searching for a cross-over point necessitating the introduction of solar thermal or nuclear power system options as enabling technologies is considered with reference to programs ranging from the 4.8 kW Skylab to the 9.5 gW Space Power Satellite

  8. Sources of the wind power stations

    International Nuclear Information System (INIS)

    Chudivani, J.; Huettner, L.

    2012-01-01

    The paper deals with problems of the wind power stations. Describes the basic properties of wind energy. Shows and describes the different types of electrical machines used as a source of electricity in the wind power stations. Shows magnetic fields synchronous generator with salient poles and permanent magnets in the program FEMM. Describes methods for assessing of reversing the effects of the wind power stations on the distribution network. (Authors)

  9. Water pollution and thermal power stations

    International Nuclear Information System (INIS)

    Maini, A.; Harapanahalli, A.B.

    1993-01-01

    There are a number of thermal power stations dotting the countryside in India for the generation of electricity. The pollution of environment is continuously increasing in the country with the addition of new coal based power stations and causing both a menace and a hazard to the biota. The paper reviews the problems arising out of water pollution from the coal based thermal power stations. (author). 2 tabs

  10. TEPCO plans to construct Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsuruta, Atsushi

    2008-01-01

    In 2006, TEPCO submitted to the government plans for the construction of Higashidori Nuclear Power Station. The application was filed 41 years after the project approved by the Higashidori Village Assembly. This nuclear power station will be the first new nuclear power plant constructed by TEPCO since the construction of Units No.6 and 7 at the Kashiwazaki Kariwa Nuclear Power Station 18 years ago. Higashidori Nuclear Power Station is to be constructed at a completely new site, which will become the fourth TEPCO nuclear power station. Higashidori Nuclear Power Station Unit No.1 will be TEPCO's 18th nuclear reactor. Unit No.1 will be an advanced boiling water reactor (ABWR), a reactor-type with a proven track record. It will be TEPCO's third ABWR. Alongside incorporating the latest technology, in Higashidori Nuclear Power Station Unit No.1, the most important requirement is for TEPCO to reflect in the new unit information and experience acquired from the operation of other reactors (information and experience acquired through the experience of operating TEPCO's 17 units at Fukushima Daiichi Nuclear Power Station, Fukushima Daini Nuclear Power Station and Kashiwazaki Kashiwa Nuclear Power Station in addition to information on non-conformities at nuclear power stations in Japan and around the world). Higashidori Nuclear Power Station is located in Higashidori-Village (Aomori Prefecture) and the selected site includes a rich natural environment. From an environmental perspective, we will implement the construction with due consideration for the land and sea environment, aiming to ensure that the plant can co-exist with its natural surroundings. The construction plans are currently being reviewed by the Nuclear and Industrial Safety Agency. We are committed to making progress in the project for the start of construction and subsequent commercial operation. (author)

  11. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  12. The Paks Nuclear Power Station

    International Nuclear Information System (INIS)

    Erdosi, N.; Szabo, L.

    1978-01-01

    As the first stage in the construction of the Paks Nuclear Power Station, two units of 440 MW(e) each will be built. They are operated with two coolant loops each. The reactor units are VVER 440 type water-moderated PWR type heterogeneous power reactors designed in the Soviet Union and manufactured in Czechoslovakia. Each unit operates two Soviet-made K-220-44 steam turbines and Hungarian-made generators of an effective output of 220 MW. The output of the transformer units - also of Hungarian made - is 270 MVA. The radiation protection system of the nuclear power station is described. Protection against system failures is accomplished by specially designed equipment and security measures especially within the primary circuit. Some data on the power station under construction are given. (R.P.)

  13. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  14. Structure of a tropical island forest area directly affected by the hydroelectric power station of Pilar, Guaraciaba County, Minas Gerais; Estrutura de uma floresta estacional semidecidual insular em area diretamente afetada pela Usina Hidreletrica de Pilar, Guaraciaba, Zona da Mata de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Meira-Neto, Joao Augusto Alves; Silva, Alexandre Francisco da [Vicosa Univ., MG (Brazil). Dept. de Biologia Vegetal; Souza, Agostinho Lopes de [Vicosa Univ., MG (Brazil). Dept. de Engenharia Florestal; Paula, Alessandro de [Vicosa Univ., MG (Brazil). Curso de Pos-Graduacao em Botanica

    1998-12-31

    Electrical energy consumption in Brazil is increasing and new hydroelectric power stations are required. This work was carried out at a semi deciduous tropical island forest in Guaraciaba, MG to look for composition peculiarities and to provide a structural model which could be applied to reduce environmental damages caused by Pilar HPS. The point-centered quarter method was applied totalizing 50 sample units. Fifty five species were sampled and a Shannon diversity index (H) of 3.429 nats/individual found. The most important species were longiracemosus, Tapirira guianensis, Pera glabrata, Copaifera langsdorffii, Callophyllum brasiliensis and Guapira opposita. The Guaraciaba island forest presented the peculiarity of Podocarpus sellowii occurrence sellowii occurrence, a rare gymnosperm species that does not occur at nearby forests. The Guaraciaba island forest is probably representative of an original alluvial forest at Piranga valley. (author) 14 refs., 1 fig., 1 tab.

  15. MHD power station with coal gasification

    International Nuclear Information System (INIS)

    Brzozowski, W.S.; Dul, J.; Pudlik, W.

    1976-01-01

    A description is given of the proposed operating method of a MHD-power station including a complete coal gasification into lean gas with a simultaneous partial gas production for the use of outside consumers. A comparison with coal gasification methods actually being used and full capabilities of power stations heated with coal-derived gas shows distinct advantages resulting from applying the method of coal gasification with waste heat from MHD generators working within the boundaries of the thermal-electric power station. (author)

  16. Islands for nuclear power stations

    International Nuclear Information System (INIS)

    Usher, E.F.F.W.; Fraser, A.P.

    1981-01-01

    The safety principles, design criteria and types of artificial island for an offshore nuclear power station are discussed with particular reference to siting adjacent to an industrial island. The paper concludes that the engineering problems are soluble and that offshore nuclear power stations will eventually be built but that much fundamental work is still required. (author)

  17. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  18. Environmental surveillance of PWR power stations

    International Nuclear Information System (INIS)

    Conti, M.

    1980-01-01

    The action of Electricite de France with respect to the environment of PWR nuclear power stations is essentially centred on prevention. Controls are carried out at two levels: - before the power station goes on stream (radioecological study), - when the power station is operational. The purpose of the controls effected on the radioactive effluents and the environment is to check that the maximum discharge rate stipulated in the corresponding orders is complied with and to ensure that there are no anomalies in the environment [fr

  19. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  20. Tokai earthquakes and Hamaoka Nuclear Power Station

    International Nuclear Information System (INIS)

    Komura, Hiroo

    1981-01-01

    Kanto district and Shizuoka Prefecture are designated as ''Observation strengthening districts'', where the possibility of earthquake occurrence is high. Hamaoka Nuclear Power Station, Chubu Electric Power Co., Inc., is at the center of this district. Nuclear power stations are vulnerable to earthquakes, and if damages are caused by earthquakes in nuclear power plants, the most dreadful accidents may occur. The Chubu Electric Power Co. underestimates the possibility and scale of earthquakes and the estimate of damages, and has kept on talking that the rock bed of the power station site is strong, and there is not the fear of accidents. However the actual situation is totally different from this. The description about earthquakes and the rock bed in the application of the installation of No.3 plant was totally rewritten after two years safety examination, and the Ministry of International Trade and Industry approved the application in less than two weeks thereafter. The rock bed is geologically evaluated in this paper, and many doubtful points in the application are pointed out. In addition, there are eight active faults near the power station site. The aseismatic design of the Hamaoka Nuclear Power Station assumes the acceleration up to 400 gal, but it may not be enough. The Hamaoka Nuclear Power Station is intentionally neglected in the estimate of damages in Shizuoka Prefecture. (Kako, I.)

  1. Reliability study of nuclear power stations

    International Nuclear Information System (INIS)

    Nemec, J.; Sedlacek, J.

    1975-01-01

    The paper considers the physical and mathematical bases underlying nuclear power station reliability from the standpoints of material fatigue, thermal yield and ageing. The risk of failure of nuclear power station components is determined by means of the Markov stochastic process

  2. The 'electric power' experience: Between nostalgia and the future

    International Nuclear Information System (INIS)

    Moergeli, H.P.

    1994-01-01

    The ''Muehleberg'' is a concept which is mostly used in connection with the nuclear power station. But there is more to the ''Muehleberg'' than at first sight. A hydroelectric station, a waste dump gas plant and the brandnew works management centre of the Bernische Kraftwerke AG (BKW) constitute the framework for a host of other attractions in the field of electric power; among others, examples of technological culture in the BKW museum, which are worth seeing. (orig.) [de

  3. Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' hydroelectric system into the power system of the Republic of Macedonia

    International Nuclear Information System (INIS)

    Rumenova, Evica; Naumoski, Kliment

    2001-01-01

    At the and of 1998, a study on conditions and possibilities of the 'Shara' hydroelectric system construction was prepared. The study considers an interesting idea for building up three reversible power plants. From electricity point of view the study emphasizes several significant issues that require comprehensive analyses in order to define the conditions and possibilities for their development. This paper attempts to give an overview of one of this issues: Conditions and possibilities for inclusion the hydro-power plants from the 'Shara' - system into the power supply system of Republic of Macedonia. (Original)

  4. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  5. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  6. The Hydroelectric Business Unit of Ontario Power Generation Inc

    International Nuclear Information System (INIS)

    Gaboury, J.

    2001-01-01

    The focus of this presentation was on the generation and sale of electricity. Prior to deregulation, companies that generated electricity had a readily available customer base to whom the electricity could be sold. The author discussed some of the changes affecting the industry as a result of deregulation of the electricity market in Ontario: the increasing number of companies, as well as the increased number of generators supplying power within the province. Currently 85 per cent of the generation in Ontario is met by Ontario Power Generation (OPG) and this percentage will decrease through de-control. De-control can be achieved in a variety of ways, either through the sale of assets, leases, asset swaps. The market rules dictate that OPG not control in excess of 35 per cent of the generation supply in Ontario, OPG is examining the situation. New supply being constructed or new interconnections with neighboring markets could affect the total assets that would have to be de-controlled. OPG has a mix of generation that includes hydroelectric, fossil, and nuclear, as well as a single wind turbine. Green power, defined as electricity generation deemed less intrusive environmentally than most traditional generation, includes wind, water, landfill gas, solar and others, and could affect the mix of generation. It is expected that there will be a niche market for green power, especially when one considers the reduction in emissions. It could represent a viable option for smaller startup companies, as less capital is required. The options for selling the power, either to the spot market or by entering into a bilateral contract with another customer, were explained

  7. Synanthropy of mosquitoes and sand flies near the Aimorés hydroelectric power plant, Brazil.

    Science.gov (United States)

    Barata, R A; Ursine, R L; Nunes, F P; Morais, D H; Araújo, H S

    2012-12-01

    The environmental changes resulting from the construction of hydroelectric dams may affect the fauna of insect vectors and consequently the epidemiology of the diseases they transmit. This work examined the mosquito and sand fly fauna in the area of the Aimorés hydroelectric power plant, analyzing the seasonal distribution and the degree of species synanthropy in different ecotopes. Between November, 2008 and September, 2009, entomological captures were performed with the help of HP light traps in the rural, urban, and forest areas of Aimorés, Ituêta, Resplendor, and Baixo Guandu counties. The fauna proved to be quite diversified. Twenty-two species of mosquitoes and 11 species of sand flies were found. Culex quinquefasciatus was predominant among mosquitoes (76.7%), while Lutzomyia intermedia prevailed among sand flies (34.5%). Some of the captured species have medical interest. Supported by the high degree of synanthropy, those species reinforce the need for epidemiological surveillance. © 2012 The Society for Vector Ecology.

  8. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  9. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  10. Cross currents : hydroelectricity and the engineering of northern Ontario

    International Nuclear Information System (INIS)

    Manore, J.L.

    1999-01-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations' peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario's north and south. refs., figs

  11. Studying dynamics of indicators of nuclear power stations exploitation (the case of US nuclear power stations)

    OpenAIRE

    Varshavsky, Leonid

    2013-01-01

    Analysis of external and internal factors influencing significant improvement of economic indicators of US nuclear power stations in the 1990s is carried out. Approaches to modeling dynamics of capacity factors of nuclear power stations are proposed. Comparative analysis of dynamics of capacity factors and occupational radiation exposure for various generations of US nuclear power plants is carried out. Dynamical characteristics of «learning by doing» effects for analyzed indicators are measu...

  12. Complex researches on substantiation of construction and seismic stability of large dams in seismic region

    International Nuclear Information System (INIS)

    Negmatullaev, S.Kh.; Yasunov, P.A.

    2001-01-01

    This article is devoted to complex researches on substantiation of construction and seismic stability of large dams (Nurec hydroelectric power station) in seismic region. Geological, seismological, model, and engineering investigations are discussed in this work. At construction of Nurec hydroelectric power station the rich experience is accumulated. This experience can be used in analogous seismically active regions at construction similar hydroelectric power stations.

  13. Extension of life of nuclear power stations

    International Nuclear Information System (INIS)

    Takahashi, Hideaki

    1991-01-01

    At the time of designing nuclear power stations, as their service life, generally 40 years are taken, and the basic design specifications of machinery and equipment are determined. In USA where atomic energy has been developed, the new construction of nuclear power stations is cased for a while, however, if this situation continues as it is, since old power stations reach the service life of 40 years and are retired in near future, it is feared that the circumstance of the total amount of power generation becoming short will occur. As one of the countermeasures to this, the research on the extension of life of nuclear power stations has been carried out in many fields in USA, and it is expected that the application for extending the life for the power stations constructed in the initial period of development is submitted in 1991. The researches that have been carried out for solving the technical problems in this extension of life and the situation in Japan are reported. The NEC of USA decided that the operation period of nuclear power stations in USA, which is considered to be 40 years so far, can be extended up to the limit of 20 years. The background and circumstances of this problem in USA, Nuclear Plant Aging Research Program, Plant Life Extension Program and so on are reported. (K.I.)

  14. Impacts of the Garafiri hydroelectric dam on the Konkoure estuary

    International Nuclear Information System (INIS)

    Samoura, K.; Waaub, J.P.

    2008-01-01

    This article described the environmental impacts caused by the exploitation of one or several dams in tropical coastal basins. In particular, it proposed a methodological approach for analyzing the vulnerability of ecosystems to modifications caused by the exploitation of the Garafiri hydroelectric dam in Guinea. With an installed power capacity of 75 MW, this dam has been operational since 1999 and has supplied electricity to coastal and mid Guinea since 2000. Since then, the ecosystem of the Konkoure River has undergone important changes. This study focused primarily on impacts during the dry season. Data was collected at different hydroelectric stations along the Konkoure Basin to estimate changes in water flow in the estuary. The study showed several changes, including noticeable impacts on the soil salt content. In addition, changes in vegetation were attributed to changes in soil content. The study revealed that rice production has increased 65 per cent since 2000, while salt exploitation has been completely discontinued. It was concluded that the hydraulic management of the dam can have a significant impact on the region's ecosystem which can in turn influence ecological and social economic functions. It was concluded that the vulnerability of the ecosystem can be worsened in the context of climate change. 25 refs., 9 figs

  15. Environmental Impact Report from Santa Rita Hydroelectric Power Plant (Minas Gerais State - Brazil): technical strategic for its elaboration

    International Nuclear Information System (INIS)

    Souza, J.A. de; Marques Neto, F.P.

    1989-01-01

    The steps for developing the technical strategies used on the elaboration of Environmental Impact Report from Santa Rita Hydroelectric Power Plant, Minas Gerais State, are described, including the influence area, technical requirements, impact identification, technical selection of mitigative measures, impact meaning and strategy for evaluating the identified impacts. (C.G.C.)

  16. Principles of nuclear power station control

    International Nuclear Information System (INIS)

    Knowles, J.B.

    1975-12-01

    This memorandum represents lecture notes first distributed as part of a UKAEA introductory course on Reactor Technology held during November 1975. A nuclear power station is only one element of a dispersed interconnected arrangement of other nuclear and fossil-fired units which together constitute the national 'grid'. Thus the control of any one station must relate to the objectives of the grid network as a whole. A precise control of the supply frequency of the grid is achieved by regulating the output power of individual stations, and it is necessary for each station to be stable when operating in isolation with a variable load. As regards individual stations, several special control problems concerned with individual plant items are discussed, such as: controlled reactivity insertions, temperature reactivity time constants and flow instability. A simplified analysis establishes a fundamental relationship between the stored thermal energy of a boiler unit (a function of mechanical construction) and the flexibility of the heat source (nuclear or fossil-fired) if the station is to cope satisfactorily with demands arising from unscheduled losses of other generating sets or transmission capacity. Two basic control schemes for power station operation are described known as 'coupled' and 'decoupled control'. Each of the control modes has its own merits, which depend on the proposed station operating strategy (base load or load following) and the nature of the heat source. (U.K.)

  17. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  18. Pumps for nuclear power stations

    International Nuclear Information System (INIS)

    Ogura, Shiro

    1979-01-01

    16 nuclear power plants are in commercial operation in Japan, and nuclear power generation holds the most important position among various substitute energies. Hereafter also, it is expected that the construction of nuclear power stations will continue because other advantageous energy sources are not found. In this paper, the outline of the pumps used for BWR plants is described. Nuclear power stations tend to be large scale to reduce the construction cost per unit power output, therefore the pumps used are those of large capacity. The conditions to be taken in consideration are high temperature, high pressure, radioactive fluids, high reliability, hydrodynamic performances, aseismatic design, relevant laws and regulations, and quality assurance. Pumps are used for reactor recirculation system, control rod driving hydraulic system, boric acid solution injecting system, reactor coolant purifying system, fuel pool cooling and purifying system, residual heat removing system, low pressure and high pressure core spraying systems, and reactor isolation cooling system, for condensate, feed water, drain and circulating water systems of turbines, for fresh water, sea water, make-up water and fire fighting services, and for radioactive waste treating system. The problems of the pumps used for nuclear power stations are described, for example, the requirement of high reliability, the measures to radioactivity and the aseismatic design. (Kako, I.)

  19. Work place regulations - effects on power station construction

    International Nuclear Information System (INIS)

    Richter, E.

    1979-01-01

    The paper describes that the Workplace Order and Workplace Regulations cannot be applied in every area of a conventional power station or the conventional sections of nuclear power stations. In any case extensive regulations already exist for the hot regions of nuclear power stations. A proposal is made as to which areas of power stations should be developed in accordance with the Workplace Order and the Workplace Regulations and which areas are not deemed to be 'Workplaces'. This is illustrated with the aid of typical examples. (orig.) [de

  20. Evaluation of scenery in power stations

    International Nuclear Information System (INIS)

    Wakatani, Yoshifumi; Yamamoto, Kimio

    1982-01-01

    In the location of power sources hereafter, the location in natural landscape away from urban district tends to increase, accordingly, it is necessary to investigate beforehand the influence to surrounding scenery. However, the method of predicting and evaluating the effect on scenery has not yet been established, therefore, in this study, the basic concept on the investigation, forecast and evaluation of the scenery in power stations was clarified, and the establishment of the work procedure to evaluate the scenery and the effectiveness of the method of forecast and evaluation were examined. Also, the problems when power station facilities exert influence on scenery and the countermeasures to them were considered. Psychological experiment was carried out on the method of evaluation, and the structure and the regulating factors of scenery evaluation were clarified. Recently, good living environment is desired by public, and to the problems of fine environment regarding power stations, more attention is paid. The scenery problems of power stations are the protection of nature and the preservation of good living environment. Since this is an undeveloped field, many problems to be examined still remain. (Kako, I.)

  1. 47 CFR 74.793 - Digital low power TV and TV translator station protection of broadcast stations.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... DISTRIBUTIONAL SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.793 Digital low power TV and TV translator station protection of broadcast stations. (a) An application to construct a new digital low power...

  2. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  3. Hydroelectric power and global environmental problems: benefits and environmental impacts

    International Nuclear Information System (INIS)

    Chabot, B.

    1992-01-01

    The risk of global warming is one of the most serious global environmental problems. It is due to the increase of greenhouse gases emissions, mainly because of the use of fossil fuels in the energy sector, particularly for electricity generation. At an international level, experts now agree that measures are to be taken to reduce this risk. In the energy sector, an improvement of energy efficiency and an increase of nuclear electricity generation are often presented as the best available solutions. Renewable energy sources are often presented as a solution with a negligible potential impact, and sometimes, hydro power is even forgotten, or its coasts and its potential impacts on local environment are presented as an obstacle to its positive contribution to the reduction of global warming risk. Without denying the positive impacts of other solutions, this paper explains the possibilities and the benefits of an increased use of hydroelectric power, when implemented with a minimum impact on local environment and with a synergistic effect with the rational use of generated energy, in order to have access to a sustainable development. 19 refs., 6 figs

  4. Power station impacts: socio-economic impact assessment

    International Nuclear Information System (INIS)

    Glasson, John; Elson, Martin; Barrett, Brendan; Wee, D. Van der

    1987-01-01

    The aim of this study is to assess the local social and economic impacts of a proposed nuclear power station development at Hinkley Point in Somerset. The proposed development, Hinkley Point C, would be an addition to the existing Hinkley Point A Magnox station, commissioned in 1965, and the Hinkley Point B Advanced Gas Cooled Reactor (AGR) station, commissioned in 1976. It is hoped that the study will be of assistance to the CEGB, the Somerset County and District Councils and other agencies in their studies of the proposed development. In addition, the study seeks to apply and further develop the methodology and results from previous studies by the Power Station Impacts (PSI) team for predicting the social and economic effects of proposed power station developments on their localities. (author)

  5. Operator training for the Yacyreta binational hydroelectric power plant; Formacion de operadores para la Central Hidroelectrica de Yacireta

    Energy Technology Data Exchange (ETDEWEB)

    Dure, Francisco; Tachella, Heriberto [Entidad Binacional Yacyreta, Isla Yacireta (Paraguay). Central Hidroelectrica Yacyreta]. E-mail: yacyreta@internet.siscotel.com

    1998-07-01

    This work is oriented to the power plant operators, by exposing the criteria and methods adopted for operators selection, training and incorporation to the Yacyreta Hydroelectric Power Plant. The used criteria considered some aspects, as follows: the operation staff should be consisted of equal numbers of Argentine and Paraguayan nationalities, viewing the both systems operation; experience of the shift supervisors in operating a plant for a minimum of 10 years; the supervisors should participate training the auxiliary operators.

  6. Pollution and power generation: environmental implications Small Hydroelectric Plants of Sao Paulo

    Directory of Open Access Journals (Sweden)

    Giorgia Limnios

    2015-06-01

    Full Text Available The current situation of water scarcity of of São Paulo State, manifested as imminent risk of shortages in major urban areas, has led not only to issues concerning preservation of water resources, but also problems related to energy availability, identified in a series of expeditions field carried out under the project " Electricity History of the State of Sao Paulo (1890-1960: Industrial Heritage , Landscape and Environment – Electromemory II”. The objective of this project is to study an extremely representative set of power plants and small hydroelectric power plants built during the initial period of electrification of the State of São Paulo – Brazil (1890-1960, along with its evolution within the social, historical and geographical aspects, to highlight the landscape changes resulting from the electrification process, as well as beneficiaries and impacts on landscape during the study period. In all visits, in addition to the problem of water scarcity, we verified that the power plants face generation constraints related to severe water pollution, either by diffuse or point sources. Some studies conducted in Brazil have analyzed the interference of pollution in power generation , highlighting the role of diffuse sources such as solid waste, sediments from areas with strong erosion, lubricant oils from vehicles or the development of invasive species, particularly as macrophytes, causative agents of biochemical changes that promote the formation of chemical compounds able to erode the electromechanical equipment of the plants or even prevent the flow of water intake into the same. The power plants covered by Electromemory II Project scope have these same problems, which prompted the need to establish a relationship between pollution in its various forms and the generation of electricity. To establish this bridge, the survey of publications and technical reports was necessary as well asresearches inenvironmental legislation

  7. Policy for rekindling and re-powering of small scale hydroelectric power plants; Politica de rejuvenescimento e repotenciacao de PCH`s

    Energy Technology Data Exchange (ETDEWEB)

    Souza, Wanderley I. de [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil). Div. de Geracao

    1997-12-31

    The demand of electric energy comes increasing gradually and the offer of energy with of growth of the market, becomes a product, a great concern. In this matter Small Hydroelectric Power Plant SHP`s can be fundamental to offer support to the electric section, but these small sources of energy need to be adapting rekindling and repowering, being used of new market technologies and of economic studies that can give reliability and speed in the evaluations of the processes. (author)

  8. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  9. The performance study of a small hydroelectric power system

    International Nuclear Information System (INIS)

    Al-Jumaily, Khalil E. J.; Tawfi, Sinan Samir

    2006-01-01

    A small hydroelectric power system of an undershot waterwheel was designed, constructed and experimented in the hydraulic channel which has a sluice gate as a small dam. The constructed waterwheel diameter could be changed from 0.4 m to 0.6 m at interval steps of 0.04 m. The number of blades of the constructed waterwheel could be changed from 9 to 12 to 18 and to 36 blades. By increasing the water mass flow rate from 0.341 to 1.765 kg/s at channel cross sectional area (12.75 cm 2 ), the undershot waterwheel generated power which increased to 0.201 Watt, the mechanical efficiency increased to more than 10.8%, and the electrical efficiency increased to more than 80.6%. But the channel efficiency was decreased to 10.9%. while the volumetric efficiency was fixed at 72.9%. The waterwheel efficiency 17.25 m 2 at fixed water mass flow rate (1.765kg/s), the undershot waterwheel generated power system decreased in the following. The generator output power from 0.201 to 0.067 Watt, the mechanical efficiency reduced to 26.7% and the electrical efficiency reduced 94.4% and increased the channel efficiency from 8.6% to 100%, the volumetric efficiency from 70.9% to 75.5%, and the waterwheel efficiency from 85.7%( to 91.3%. The transitional efficiency was fixed at 97.9%. The maximum overall efficiency of the small generated power system was 6.69% at the water head 15.45 cm. The output power was 0.18 Watt. these values obtained when the number of blades 36, number of revolutions per minute 57 rpm, waterwheel diameter 0.44 m, water mass flow rate 1.765 kg/s, and channel cross sectional area 12.75 cm 2 . The theoretical extrapolation of the waterwheel diameter to 2 m with water head of 5 m gives an output generated power of 675 Watt.(Author)

  10. The evolving policy regime for pumped storage hydroelectricity in China: A key support for low-carbon energy

    International Nuclear Information System (INIS)

    Zhang, Sufang; Andrews-Speed, Philip; Perera, Pradeep

    2015-01-01

    Highlights: • Highlights the role of pumped storage hydroelectricity in renewable energy integration. • Examines the development of pumped storage hydroelectricity in China. • Reviews the regulatory policies on pumped storage hydroelectricity in China. • Analyzes the operation and pricing regime for pumped storage hydroelectricity in China. • Makes policy recommendations for promoting pumped storage hydroelectricity in China. - Abstract: As part of its energy transition strategy, China has set ambitious targets for increasing the contribution of renewable energy and, in particular, of wind power. However, the Chinese power sector has not undergone the necessary reforms to facilitate the integration and absorption of a larger share of variable renewable energy. This is evident from the difficulties in absorbing wind power from already commissioned wind farms and the resultant curtailment of wind power. Pumped storage hydroelectricity (PSH) is a flexible power source that can facilitate higher penetration levels of wind power as well as complement China’s growing nuclear power capacity. However, regulatory policy constraints have restricted the effective utilization of existing PSH capacity and discouraged investment in new PSH capacity. This paper examines these constraints and assesses the likely impact of new policies designed to address them. Finally, policy recommendations and concluding remarks are provided. This paper contributes to the literature on renewable energy integration from a new perspective. The lessons from China are relevant to other countries going through the energy transition

  11. On the development of small nuclear power stations

    International Nuclear Information System (INIS)

    Goetzmann, C.A.

    1989-01-01

    There are weighty reasons for and against the building of small nuclear power stations. Factors such as specific investment costs, opportunities for and areas of application, geographical conditions as well as those relating to infrastructure, security and availability play an important role in the planning, construction and running of a nuclear power station. For the usual large power stations, the comparatively low specific investment costs and a proven technology are favorable factors which minimize the investment risk. The article presents an overview of reasons for using small power stations and also considers the difficulties which would arise in practice. (orig.) [de

  12. Simulation of a pressurized-water nuclear power station

    International Nuclear Information System (INIS)

    Larminaux, Robert; Ourmann, Michel

    1978-01-01

    Faced with the large programme of fitting out PWR nuclear power stations, Electricite de France have undertaken a series of studies with a view to ensuring the best possible adaptation of the secondary part -particularly the feed water heating section- to the nuclear boiler. In order to undertake such studies it has been necessary to finalize simulation models of the entire power station. So as to verify the validity of the models, experiment-calculation comparisons were made during transient operating states recorded at the Ardennes power station as well as during starting up trials at the Tihange I power station [fr

  13. Electricity supplies in a French nuclear power station

    International Nuclear Information System (INIS)

    2011-01-01

    As the operation of a nuclear power station requires a power supply system enabling this operation as well as the installation safety, this document describes how such systems are designed in the different French nuclear power stations to meet the requirements during a normal operation (when the station produces electricity) or when it is stopped, but also to ensure power supply to equipment ensuring safety functions during an incident or an accident occurring on the installation. More precisely, these safety functions are provided by two independent systems in the French nuclear power stations. Their operation is briefly described. Two different types of nuclear reactors are addressed: pressurised water reactors (PWR) of second generation, EPR (or PWR of third generation)

  14. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  15. Space Station Freedom power - A reliability, availability, and maintainability assessment of the proposed Space Station Freedom electric power system

    Science.gov (United States)

    Turnquist, S. R.; Twombly, M.; Hoffman, D.

    1989-01-01

    A preliminary reliability, availability, and maintainability (RAM) analysis of the proposed Space Station Freedom electric power system (EPS) was performed using the unit reliability, availability, and maintainability (UNIRAM) analysis methodology. Orbital replacement units (ORUs) having the most significant impact on EPS availability measures were identified. Also, the sensitivity of the EPS to variations in ORU RAM data was evaluated for each ORU. Estimates were made of average EPS power output levels and availability of power to the core area of the space station. The results of assessments of the availability of EPS power and power to load distribution points in the space stations are given. Some highlights of continuing studies being performed to understand EPS availability considerations are presented.

  16. Monitoring of nuclear power stations

    International Nuclear Information System (INIS)

    Ull, E.; Labudda, H.J.

    1987-01-01

    The purpose of the invention is to create a process for undelayed automated detection and monitoring of accidents in the operation of nuclear power stations. According to the invention, this problem is solved by the relevant local measurements, such as radiation dose, components and type of radiation and additional relevant meteorological parameters being collected by means of wellknown data collection platforms, these being transmitted via transmission channels by means of satellites to suitable worldwide situated receiving stations on the ground, being processed there and being evaluated to recognise accidents. The local data collection platforms are used in the immediate vicinity of the nuclear power station. The use of aircraft, ships and balloons as data collection systems is also intended. (HWJ)

  17. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  18. Hydroelectric project EA's [environmental assessments]: The Magpie development in northern Ontario

    International Nuclear Information System (INIS)

    Ashwood, K.

    1992-01-01

    Great Lakes Power recently constructed a hydroelectric plant on the Magpie River near Wawa, Ontario. The project involved three main elements: construction of a 33 m high dam, a 15.5 MW power station, and a spillway at Steephill Falls; construction of a 3.5 m high overflow weir just above the crest of scenic Magpie Falls, creating a head pond to supply a 15 MW power plant; and construction of a weir and 15 MW power plant at Mission Falls. Although this was a private development and therefore not automatically subject to Ontario's Environmental Assessment Act, Great Lakes Power decided to conform with the act's requirements and undertook a comprehensive environmental assessment (EA). Environmental issues were focused on changes in hydrology and water quality, impacts on fisheries and natural resources, slope stability and erosion, socioeconomic impacts, impacts on heritage resources, and impacts on tourism and recreation. The project was approved subject to conditions which included implementation of mitigation and monitoring requirements outlined in the EA document. Environmental specialists worked closely with the engineers at the detailed design stage of the project, resulting in modifications to the preliminary design to minimize environmental impacts

  19. Design of an Adaptive Power Regulation Mechanism and a Nozzle for a Hydroelectric Power Plant Turbine Test Rig

    Science.gov (United States)

    Mert, Burak; Aytac, Zeynep; Tascioglu, Yigit; Celebioglu, Kutay; Aradag, Selin; ETU Hydro Research Center Team

    2014-11-01

    This study deals with the design of a power regulation mechanism for a Hydroelectric Power Plant (HEPP) model turbine test system which is designed to test Francis type hydroturbines up to 2 MW power with varying head and flow(discharge) values. Unlike the tailor made regulation mechanisms of full-sized, functional HEPPs; the design for the test system must be easily adapted to various turbines that are to be tested. In order to achieve this adaptability, a dynamic simulation model is constructed in MATLAB/Simulink SimMechanics. This model acquires geometric data and hydraulic loading data of the regulation system from Autodesk Inventor CAD models and Computational Fluid Dynamics (CFD) analysis respectively. The dynamic model is explained and case studies of two different HEPPs are performed for validation. CFD aided design of the turbine guide vanes, which is used as input for the dynamic model, is also presented. This research is financially supported by Turkish Ministry of Development.

  20. Economic performance of small scale hydroelectric power plants: `Results center`; Desempenho economico de PCH`s: centro de resultados

    Energy Technology Data Exchange (ETDEWEB)

    Cipoli, Jose Adolfo; Silva, Jose Paulo Mendes [Companhia Paulista de Forca e Luz (CPFL), Campinas, SP (Brazil)

    1995-12-31

    This work presents the experience concerning the creation of an imaginary company named `CPFL Generator`, composed by 20 small scale hydroelectric power plants. The main idea of the project is to analyse the economic performance of each unit individually and the group as a company, enabling to a better quality management 3 refs., 1 fig., 7 tabs.

  1. Safety aspects of nuclear power stations

    International Nuclear Information System (INIS)

    Binner, W.

    1980-01-01

    Psychological aspects of the fear of nuclear power are discussed, cancer deaths due to a nuclear accident are predicted and the need for nuclear accident prevention is stressed. A simplified analysis of the safety precautions in a generalised nuclear power station is offered, with reference to loss-of-coolant incidents, and developments in reactor design for fail-safe modes are explained. The importance of learning from the Three Mile Island incident is noted and failure statistics are presented. Tasks to be undertaken at the Austrian Zwentendorf nuclear power station are listed, including improved quality control and acoustic detectors. Precautions against earthquakes are also discussed and it is stated that safe operation of the Zwentendorf station will be achieved. (G.M.E.)

  2. Short term hydroelectric power system scheduling with wind turbine generators using the multi-pass iteration particle swarm optimization approach

    International Nuclear Information System (INIS)

    Lee, T.-Y.

    2008-01-01

    This paper uses multi-pass iteration particle swarm optimization (MIPSO) to solve short term hydroelectric generation scheduling of a power system with wind turbine generators. MIPSO is a new algorithm for solving nonlinear optimal scheduling problems. A new index called iteration best (IB) is incorporated into particle swarm optimization (PSO) to improve solution quality. The concept of multi-pass dynamic programming is applied to modify PSO further and improve computation efficiency. The feasible operational regions of the hydro units and pumped storage plants over the whole scheduling time range must be determined before applying MIPSO to the problem. Wind turbine power generation then shaves the power system load curves. Next, MIPSO calculates hydroelectric generation scheduling. It begins with a coarse time stage and searching space and refines the time interval between two time stages and the search spacing pass by pass (iteration). With the cooperation of agents called particles, the near optimal solution of the scheduling problem can be effectively reached. The effects of wind speed uncertainty were also considered in this paper. The feasibility of the new algorithm is demonstrated by a numerical example, and MIPSO solution quality and computation efficiency are compared to those of other algorithms

  3. Can we afford shutting down power stations?

    International Nuclear Information System (INIS)

    Hesse, David

    2015-01-01

    The author discusses and criticizes some popular beliefs on the profitability of nuclear power stations, on the fact that they are now too old to be exploited, and on the fact that nuclear energy is the most subsidised energy. As some European countries decided to phase out nuclear, he notices that the decrease of gas prices undermines the profitability of nuclear power stations in the USA and that new rules aimed at the reduction of CO 2 emissions result in high subsidies for renewable energies which are however handicapped by the grid ability to integrate all energies. He outlines that shutting down a nuclear power station costs a lot of money to the society, and denies the argument of non-profitability of these stations. He states that the issue of nuclear subsidies is in fact a matter of tax policy. He also states that these so-said old power stations take in fact advantage of numerous technical innovations for their equipment, components, technology and fuels which improve their efficiency, durability, performance and flexibility

  4. Environmental radiation monitoring system in nuclear power station

    International Nuclear Information System (INIS)

    Matsuoka, Sadazumi; Tadachi, Katsuo; Endo, Mamoru; Yuya, Hiroshi

    1983-01-01

    At the time of the construction of nuclear power stations, prior to their start of operation, the state of environmental radiation must be grasped. After the start of the power stations, based on those data, the system of environmental radiation monitoring is established. Along with the construction of Kashiwazaki-Kariwa Nuclear Power Station, The Tokyo Electric Power Co., Inc. jointly with Fujitsu Ltd. has developed a high-reliability, environmental radiation monitoring system, and adopted ''optical data highways'' using optical fiber cables for communication. It consists of a central monitoring station and 11 telemeter observation points, for collecting both radiation and meteorological data. The data sent to the central station through the highways are then outputted on a monitoring panel. They are analyzed with a central processor, and the results are printed out. (Mori, K.)

  5. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  6. Simulation of the energy - environment economic system power generation costs in power-stations

    International Nuclear Information System (INIS)

    Weible, H.

    1978-09-01

    The costs of power generation are an important point in the electricity industry. The present report tries to supply a model representation for these problems. The costs of power generation for base load, average and peak load power stations are examined on the basis of fossil energy sources, nuclear power and water power. The methods of calculation where dynamic investment calculation processes are used, are given in the shape of formulae. From the point of view of long term prediction, power generation cost sensitivity studies are added to the technical, economic and energy-political uncertainties. The sensitivity of models for calculations is examined by deterministic and stochastic processes. In the base load and average region, power generation based on nuclear power and water power is economically more favourable than that from fossilfired power stations. Even including subsidies, this cost advantage is not in doubt. In the peak load region, pumped storage power stations are more economic than fossilfired power stations. (orig.) [de

  7. Nuclear power station achievement 1968-1980

    International Nuclear Information System (INIS)

    Howles, L.R.

    This report reviews and gives an analysis of the achievement of operating nuclear power stations in the Western world on three relevant bases: (1) both annual and cumulative achievement of all nuclear power stations at a particular time; (2) cumulative achievement of all nuclear power stations at the end of the first and subsequent years of their lives to show trends with age; (3) achievement based on refuelling period considerations. Nowhere in the report are any operating details ignored, omitted or eliminated in the method of analysis. Summarising the results of the reviews shows: an improvement with time from initial electricity generation on all bases; that initially, larger sizes of reactor/turbine operate less well than smaller sizes (except for PHWR's); that after an initial number of years, the largest size units operate as well as the intermediate and smaller sizes, or better in the PHWR case; that a 75 per cent cumulative load factor achievement in the middle years of a reactor/turbines life can be expected on the refuelling period considerations base; that at June 1980, 35 nuclear power stations achieved an annual load factor over 75 per cent; that the above achievement was possible despite the repercussions following the Three Mile Island 'accident' and the shutdowns in the USA for piping system seismic adequacy checks required by the Nuclear Regulatory Commission for five nuclear power stations; and that even when reactors/turbines are reaching towards the end of their design life, there is no rapid deterioration in their achievements. (author)

  8. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    International Nuclear Information System (INIS)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  9. Microprocessor-based accelerating power level detector

    Energy Technology Data Exchange (ETDEWEB)

    Nagpal, M.; Zarecki, W.; Albrecht, J.C.

    1994-01-01

    An accelerating power level detector was built using state-of-the-art microprocessor technology at Powertech Labs Inc. The detector will monitor the real power flowing in two 300 kV transmission lines out of Kemano Hydroelectric Generating Station and will detect any sudden loss of load due to a fault on either line under certain pre-selected power flow conditions. This paper discusses the criteria of operation for the detector and its implementation details, including digital processing, hardware, and software.

  10. Wind turbine power stations

    International Nuclear Information System (INIS)

    Anon.

    1992-11-01

    The Countryside Council for Wales (CCW's) policy on wind turbine power stations needs to be read in the context of CCW's document Energy:Policy and perspectives for the Welsh countryside. This identifies four levels of action aimed at reducing emission of gases which contribute towards the risk of global warming and gases which cause acid deposition. These are: the need for investment in energy efficiency; the need for investment in conventional power generation in order to meet the highest environmental standards; the need for investment in renewable energy; and the need to use land use transportation policies and decisions to ensure energy efficiency and energy conservation. CCW views wind turbine power stations, along with other renewable energy systems, within this framework. CCW's policy is to welcome the exploitation of renewable energy sources as an element in a complete and environmentally sensitive energy policy, subject to the Environmental Assessment of individual schemes and monitoring of the long-term impact of the various technologies involved. (Author)

  11. Report on the development perspectives of the hydroelectric production in France

    International Nuclear Information System (INIS)

    2006-03-01

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  12. Evolutionary growth for Space Station Freedom electrical power system

    Science.gov (United States)

    Marshall, Matthew Fisk; Mclallin, Kerry; Zernic, Mike

    1989-01-01

    Over an operational lifetime of at least 30 yr, Space Station Freedom will encounter increased Space Station user requirements and advancing technologies. The Space Station electrical power system is designed with the flexibility to accommodate these emerging technologies and expert systems and is being designed with the necessary software hooks and hardware scars to accommodate increased growth demand. The electrical power system is planned to grow from the initial 75 kW up to 300 kW. The Phase 1 station will utilize photovoltaic arrays to produce the electrical power; however, for growth to 300 kW, solar dynamic power modules will be utilized. Pairs of 25 kW solar dynamic power modules will be added to the station to reach the power growth level. The addition of solar dynamic power in the growth phase places constraints in the initial Space Station systems such as guidance, navigation, and control, external thermal, truss structural stiffness, computational capabilities and storage, which must be planned-in, in order to facilitate the addition of the solar dynamic modules.

  13. Railway power supply - free of crises and independent

    International Nuclear Information System (INIS)

    Weigert, E.

    1981-01-01

    The German Federal Railway realizes 84% of its transport performance by electric traction. The prevailing primary energy source of the railway electric power supply is coal, but the DB uses also furnace gas, nuclear energy and hydroelectric power. The shave of mineral oil lies by about 5%. The public utilities deliver about 15%. The dispersed situation of the power stations and converter stations over the whole supply area offers the advantage of short transport distances. Therefore the 110-kV-railway mains especially meets distribution demands. Very useful is the compound operation with the Austrian Federal Railways and the Swiss Federal Railways. (orig.) [de

  14. User Context Aware Base Station Power Flow Model

    OpenAIRE

    Walsh, Barbara; Farrell, Ronan

    2005-01-01

    At present the testing of power amplifiers within base station transmitters is limited to testing at component level as opposed to testing at the system level. While the detection of catastrophic failure is possible, that of performance degradation is not. This paper proposes a base station model with respect to transmitter output power with the aim of introducing system level monitoring of the power amplifier behaviour within the base station. Our model reflects the expe...

  15. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  16. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  17. Comparison of the economy of atomic power stations and fossil-fuel power stations under Danish conditions

    International Nuclear Information System (INIS)

    Daub, J.

    1977-06-01

    The report deals with the investment and financing aspects of extending the Danish electricity production system with central, base-load power stations. Technical and economic data for the plants are determined on the basis of an analysis of the information presently available. A description is given of the general problems connected with analysis of investment and finance relevant to power station expansion. Comparative calculations are given for alternative methods of expansion comprising a few stations to be put into operation in 1987 and for other alternative expansions that cover the period until 2000 as regards costs. For use in economic comparisons with a few plants, a new calculation method was developed that takes into account possible differences in the value of the plants in the electricity production system. This method is described in appendix 1. In a further two appendices are given the technical reasons for using, respectively, the present-value method in the investment analyses and the reserve power philosophy applied in the main report. (author)

  18. Hinkley Point 'C' power station public enquiry: proof of evidence on coal fired power station sites

    Energy Technology Data Exchange (ETDEWEB)

    Fothergill, S.; Witt, S.

    1988-11-01

    The Coalfield Communities Campaign (CCC) has argued that if a new base-load power station is required it should be coal-fired rather than nuclear, and that it should use UK coal. Proposals for new power stations at both Hinkley Point and at Fawley have encountered very considerable local and regional opposition, and this is increasingly likely to be the case at many other sites especially in Southern England. In contrast the CCC has sought to demonstrate that its member authorities would generally welcome the development of new coal-fired capacity on appropriate sites within their areas. In particular, this proof establishes that there is a prima facie case for considering three sites - Thorpe Marsh, Hams Hall and Uskmouth - as potential locations for a new large coal-fired power station as an alternative to Hinkley Point C. The relevant local authorities have expressed their willingness to co-operate in more detailed planning or technical investigations to secure a coal-fired power station on these sites. The CCC considers this to be a major and unprecedented offer to the CEGB and its successor bodies, which could greatly speed the development of new power staion capacity and be of considerable economic and social benefit to coalfield communities.

  19. Plant computer system in nuclear power station

    International Nuclear Information System (INIS)

    Kato, Shinji; Fukuchi, Hiroshi

    1991-01-01

    In nuclear power stations, centrally concentrated monitoring system has been adopted, and in central control rooms, large quantity of information and operational equipments concentrate, therefore, those become the important place of communication between plants and operators. Further recently, due to the increase of the unit capacity, the strengthening of safety, the problems of man-machine interface and so on, it has become important to concentrate information, to automate machinery and equipment and to simplify them for improving the operational environment, reliability and so on. On the relation of nuclear power stations and computer system, to which attention has been paid recently as the man-machine interface, the example in Tsuruga Power Station, Japan Atomic Power Co. is shown. No.2 plant in the Tsuruga Power Station is a PWR plant with 1160 MWe output, which is a home built standardized plant, accordingly the computer system adopted here is explained. The fundamental concept of the central control board, the process computer system, the design policy, basic system configuration, reliability and maintenance, CRT display, and the computer system for No.1 BWR 357 MW plant are reported. (K.I.)

  20. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  1. Three run-of-river power plants

    International Nuclear Information System (INIS)

    1992-01-01

    Three 'run-of-river' hydroelectric power plants in the Montreal area in the province of Quebec were described visually and in sound. A run-of-river generating station is one that has no reservoir behind the generating facilities. Instead of a reservoir, the generating station draws its power from the strong flow of the whole river as it passes through the turbines. The first generating station described was the Beauharnois power plant completed in 1963 which became the most powerful generating station in Canada at that time. Today, it ranks fourth after the La Grande complex. In winter, it supplies electricity primarily to the Quebec power system, but between April and November, 90 per cent of its power is destined for export. The Carillon power station on the Ottawa River, the second to be discussed in this videotape presentation, was completed in 1964 with a total generating capacity of 654 MW. Today, it is the tenth largest of its kind in Quebec. The Rivieres des Prairies generating station, the third and last one described was completed in 1930; today it has a generating capacity of 45 MW. Some of the efforts made by Hydro-Quebec to protect and enhance the natural environment were shown in action, including regular removal and recycling of debris at the gateways to the generating stations, construction of fish spawning ladders, and the control of zebra mussels

  2. Feasibility study on floating nuclear power station

    International Nuclear Information System (INIS)

    Kajima, Ryoichi

    1987-01-01

    It is stipulated that nuclear power plants are to be built on solid rock bases on land in Japan. However, there are a limited number of appropriate siting grounds. The Central Research Institute of Electric Power Industry has engaged since 1981 in the studies on the construction technology of power plants, aiming at establishing new siting technology to expand the possible siting areas for nuclear power plants. Underground siting is regarded as a proven technology due to the experience in underground hydroelectric power plants. The technology of siting on quaternary ground is now at the stage of verification. In this report, the outline of floating type offshore/inshore siting technology is introduced, which is considered to be feasible in view of the technical and economical aspects. Three fixed structure types were selected, of which the foundations are fixed to seabed, plant superstructures are above sea surface, and which are floating type. Aiming at ensuring the aseismatic stability of the plant foundations, the construction technology is studied, and the structural concept omitting buoyancy is possible. The most practical water depth is not more than 20 m. The overall plant design, earthquake isolation effect and breakwater are described. (Kako, I.)

  3. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  4. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  5. Energy analysis of nuclear power stations

    International Nuclear Information System (INIS)

    Lindhout, A.H.

    1975-01-01

    A study based on a 1000MWe light water reactor power station was carried out to determine the total energy input and output of the power station. The calculations took into account the mining and processing of the ore, enrichment of the uranium, treatment of used nuclear fuel, investment in land, buildings, machinery, and transport. 144 tons of natural uranium produce 6100 million kWh (electric) and 340 million kWh (thermal) per annum. (J.S.)

  6. Solidifying power station resins and sludges

    International Nuclear Information System (INIS)

    Willis, A.S.D.; Haigh, C.P.

    1984-01-01

    Radioactive ion exchange resins and sludges arise at nuclear power stations from various operations associated with effluent treatment and liquid waste management. As the result of an intensive development programme, the Central Electricity Generating Board (CEGB) has designed a process to convert power station resins and sludges into a shielded, packaged solid monolithic form suitable for final disposal. Research and development, the generic CEGB sludge/resin conditioning plant and the CEGB Active Waste Project are described. (U.K.)

  7. [Malaria and hematological aspects among residents to be impacted by reservoirs for the Santo Antônio and Jirau Hydroelectric Power Stations, Rondônia State, Brazil].

    Science.gov (United States)

    Katsuragawa, Tony Hiroshi; Cunha, Roberto Penna de Almeida; de Souza, Daniele Cristina Apoluceno; Gil, Luiz Herman Soares; Cruz, Rafael Bastos; Silva, Alexandre de Almeida E; Tada, Mauro Shugiro; da Silva, Luiz Hildebrando Pereira

    2009-07-01

    In Rondônia State, Brazil, two new hydroelectric plants, Santo Antônio and Jirau, are scheduled for construction on the Madeira River, upriver from the State capital, Porto Velho. The current study analyzes malaria prevalence before the construction and provides information on the possible impacts of malaria burden related to the influx of thousands of persons attracted by direct and indirect employment opportunities. According to the findings, malaria is present throughout the region, with varying prevalence rates. The existence of potential asymptomatic malaria carriers among the local population may be epidemiologically relevant and should be considered in the malaria control programs organized by public authorities and companies responsible for building the power plants, aimed at early diagnosis and treatment, vector control, water supply, and infrastructure in the urban areas.

  8. Process instrumentation for nuclear power station

    International Nuclear Information System (INIS)

    Yanai, Katsuya; Shinohara, Katsuhiko

    1978-01-01

    Nuclear power stations are the large scale compound system composed of many process systems. Accordingly, for the safe and high reliability operation of the plants, it is necessary to grasp the conditions of respective processes exactly and control the operation correctly. For this purpose, the process instrumentation undertakes the important function to monitor the plant operation. Hitachi Ltd. has exerted ceaseless efforts since long before to establish the basic technology for the process instrumentation in nuclear power stations, to develop and improve hardwares of high reliability, and to establish the quality control system. As for the features of the process instrumentation in nuclear power stations, the enormous quantity of measurement, the diversity of measured variables, the remote measurement and monitoring method, and the ensuring of high reliability are enumerated. Also the hardwares must withstand earthquakes, loss of coolant accidents, radiations, leaks and fires. Hitachi Unitrol Sigma Series is the measurement system which is suitable to the general process instrumentation in nuclear power stations, and satisfies sufficiently the basic requirements described above. It has various features as the nuclear energy system, such as high reliability by the use of ICs, the methods of calculation and transmission considering signal linkage, loop controller system and small size. HIACS-1000 Series is the analog controller of high reliability for water control. (Kako, I.)

  9. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  10. Lunar base thermoelectric power station study

    Science.gov (United States)

    Determan, William; Frye, Patrick; Mondt, Jack; Fleurial, Jean-Pierre; Johnson, Ken; Stapfer, G.; Brooks, Michael D.; Heshmatpour, Ben

    2006-01-01

    Under NASA's Project Prometheus, the Nuclear Systems Program, the Jet Propulsion Laboratory, Pratt & Whitney Rocketdyne, and Teledyne Energy Systems have teamed with a number of universities, under the Segmented Thermoelectric Multicouple Converter (STMC) program, to develop the next generation of advanced thermoelectric converters for space reactor power systems. Work on the STMC converter assembly has progressed to the point where the lower temperature stage of the segmented multicouple converter assembly is ready for laboratory testing and the upper stage materials have been identified and their properties are being characterized. One aspect of the program involves mission application studies to help define the potential benefits from the use of these STMC technologies for designated NASA missions such as the lunar base power station where kilowatts of power are required to maintain a permanent manned presence on the surface of the moon. A modular 50 kWe thermoelectric power station concept was developed to address a specific set of requirements developed for this mission. Previous lunar lander concepts had proposed the use of lunar regolith as in-situ radiation shielding material for a reactor power station with a one kilometer exclusion zone radius to minimize astronaut radiation dose rate levels. In the present concept, we will examine the benefits and requirements for a hermetically-sealed reactor thermoelectric power station module suspended within a man-made lunar surface cavity. The concept appears to maximize the shielding capabilities of the lunar regolith while minimizing its handling requirements. Both thermal and nuclear radiation levels from operation of the station, at its 100-m exclusion zone radius, were evaluated and found to be acceptable. Site preparation activities are reviewed and well as transport issues for this concept. The goal of the study was to review the entire life cycle of the unit to assess its technical problems and technology

  11. A nuclear power plant for Lima city. Is it a real alternative?

    International Nuclear Information System (INIS)

    Romani A, J.

    1992-01-01

    At the present, Peru has an installed electricity capacity of 4112 MW from which the 80% comes from hydroelectric sources and other 20% from thermal sources. Lima city concentrates the larger industrial activities and uses 95% of the hydro-electric supply the 5% comes from thermal origin. This situation provokes an energetic vulnerability to Lima, a city with more them 10 million of inhabitants, because climatic changes and the electric towers destruction. In the 1989-1992 period lack of energy meant economic losses for about US$ 2 100 000. To solve this problem the government is building a 300 MW thermal station. This alternative means a low investment for Kw installed but high production costs. Additionally the installation of the plant in Lima will increase the environmental contamination due to emission of about 20000 TM/year of SOx and 7500 TM/year of NOx. The research study recommends as a solution the diversification of energy sources, avoiding dependence of the hydro-electrical ones. In the same form it suggests that the next 300 MW power station to be installed for about 1998 would be a nuclear power plant but not thermal one. It also makes a revision of the new designs for nuclear power plants called safe inherently which design and construction philosophy avoid the possibility of accidents like Chernobyl. (author). 15 refs., 5 tabs., 13 figs

  12. Valves for condenser-cooling-water circulating piping in thermal power station and nuclear power station

    International Nuclear Information System (INIS)

    Kondo, Sumio

    1977-01-01

    Sea water is mostly used as condenser cooling water in thermal and nuclear power stations in Japan. The quantity of cooling water is 6 to 7 t/sec per 100,000 kW output in nuclear power stations, and 3 to 4 t/sec in thermal power stations. The pipe diameter is 900 to 2,700 mm for the power output of 75,000 to 1,100,000 kW. The valves used are mostly butterfly valves, and the reliability, economy and maintainability must be examined sufficiently because of their important role. The construction, number and arrangement of the valves around a condenser are different according to the types of a turbine and the condenser and reverse flow washing method. Three types are illustrated. The valves for sea water are subjected to the electrochemical corrosion due to sea water, the local corrosion due to stagnant water, the fouling by marine organisms, the cavitation due to valve operation, and the erosion by earth and sand. The fundamental construction, use and features of butterfly valves are described. The cases of the failure and repair of the valves after their delivery are shown, and they are the corrosion of valve bodies and valve seats, and the separation of coating and lining. The newly developed butterfly valve with overall water-tight rubber lining is introduced. (Kako, I.)

  13. Canadian Environmental Assessment Act - comprehensive study report: new Grand-Mere hydroelectric facility proposed by Hydro-Quebec

    International Nuclear Information System (INIS)

    1999-06-01

    A description is given of the hydroelectric construction project as well as the environment surrounding it, the outcome of consultations with interest parties in the public, the overall environmental impacts and cumulative impacts with associated problems that may occur in carrying out the project, attempts at project and environmental mitigation, measuring the importance of the cumulative and environmental effects, conditions for project acceptance, and the overall acceptance of the project or its rejection. The older hydroelectric project was constructed in the post-1910 period and being out of date is experiencing operational problems. There are four problem areas that are important including a need for major repairs to the turbine-generators, lack of flexibility and low electrical capacity that affect the working of the sending-end substation, a state of deterioration affecting operation of the spillways concrete structure, and a bottleneck problem on the Saint-Maurice river caused by the low flow design of the Grand-Mere power station in comparison with that of the Saint-Maurice station. Considering economical, social and environmental factors, of the three options of abandoning the site, upgrading the existing site or constructing a new one, the third option is the preferred one, a conclusion based on considering the out of date state of Grand-Mere facilities and the bottleneck flow condition created on the Saint-Maurice river by the older station. Given the proposed efforts at mitigation, and the follow-up operations stated by the third option advocate, the Department of Fisheries and Oceans is of the opinion that the proposed plans will not affect the environment in an adverse manner. 7 refs

  14. Quality control of Ling'ao nuclear power station civil construction

    International Nuclear Information System (INIS)

    Lu Buliang; Ye Changyuan

    2001-01-01

    Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the author briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non-conformance control of civil works. These quality control processes described come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience

  15. Environmental implications of fossil-fuelled power stations

    International Nuclear Information System (INIS)

    Robson, A.

    1979-01-01

    The public health and environmental implications of electricity generation by fossil-fuelled power stations are discussed with respect to pollutant emission and the disposal of waste products. The following conclusions were deduced. The policy of using tall chimney stacks has ensured that acceptable concentrations of potential pollutants are observed in the vicinity of power stations. Large scale carbon dioxide emission may represent a problem in the future due to its effect on the climate. The effects of sulphur dioxide and the oxides of nitrogen need to be kept under review but it is likely that sources other than power stations will be of greater importance in this context. Pulverised fuel ash is a safe and useful by product of power production. Finally the radiation dose to man caused by the release of naturally occurring radioisotopes is negligible compared to the natural background levels. (UK)

  16. Influence of the cost development in power station construction and operation on power station planning with special regard to the effects on electricity supply

    International Nuclear Information System (INIS)

    Krieb, K.H.; Frenzel, P.; Vogel, J.

    1974-01-01

    A survey on the present structure of thermal power facilities in the FRG is followed by a discussion of the development of power plant costs in the last few years. Also mentioned are the findings of studies of costs as a function of the power station size and the effects of the overall cost increase on the power generation costs of the last few years. Finally, a model conception for the development of power stations is presented which makes predictions about the future size of power stations and their constructional parts. (UA/AK) [de

  17. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  18. The regional issues involved in the siting of power stations

    International Nuclear Information System (INIS)

    Livingstone, R.

    1980-01-01

    This paper deals with the regional implications of power station siting in England and Wales and refers to the procedures used by the CEGB to find and develop sites. The resources required for a power station are outlined both for conventional and nuclear stations and the possible development of uses for the rejected heat from power stations as a result of the energy crisis is discussed. (U.K.)

  19. The nuclear power station

    International Nuclear Information System (INIS)

    Plettner, B.

    1987-04-01

    The processes taking place in a nuclear power plant and the dangers arising from a nuclear power station are described. The means and methods of controlling, monitoring, and protecting the plant and things that can go wrong are presented. There is also a short discourse on the research carried out in the USA and Germany, aimed at assessing the risks of utilising nuclear energy by means of the incident tree analysis and probability calculations. (DG) [de

  20. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  1. Water electrolysis plants for hydrogen and oxygen production. Shipped to Tsuruga Power Station Unit No.1, and Tokai No.2 power station, the Japan Atomic Power Co

    International Nuclear Information System (INIS)

    Ueno, Syuichi; Sato, Takao; Ishikawa, Nobuhide

    1997-01-01

    Ebara's water electrolysis plants have been shipped to Tsuruga Power Station Unit No.1, (H 2 generation rate: 11 Nm 3 /h), and Tokai No.2 Power Station (H 2 generation rate: 36 Nm 3 /h), Japan Atomic Power Co. An outcome of a business agreement between Nissho Iwai Corporation and Norsk Hydro Electrolysers (Norway), this was the first time that such water electrolysis plants were equipped in Japanese boiling water reactor power stations. Each plant included an electrolyser (for generating hydrogen and oxygen), an electric power supply, a gas compression system, a dehumidifier system, an instrumentation and control system, and an auxiliary system. The plant has been operating almost continuously, with excellent feedback, since March 1997. (author)

  2. Nuclear safeguards control in nuclear power stations

    International Nuclear Information System (INIS)

    Boedege, R.; Braatz, U.; Heger, H.

    1976-01-01

    The execution of the Non-Proliferation Treaty (NPT) has initiated a third phase in the efforts taken to ensure peace by limiting the number of atomic powers. In this phase it is important, above all, to turn into workable systems the conditions imposed upon technology by the different provisions of the Verification Agreement of the NPT. This is achieved mainly by elaborating annexes to the Agreement specifically geared to certain model plants, typical representatives selected for LWR power stations being the plants at Garigliano, Italy (BWR), and Stade, Federal Republic of Germany (PWR). The surveillance measures taken to prevent any diversion of special nuclear material for purposes of nuclear weapons manufacture must be effective in achieving their specific objective and must not impede the circumspect management of operations of the plants concerned. A VDEW working party has studied the technical details of the planned surveillance measures in nuclear power stations in the Federal Republic of Germany and now presents a concept of material balancing by units which meets the conditions imposed by the inspection authority and could also be accepted by the operators of nuclear power stations. The concept provides for uninterrupted control of the material balance areas of the nuclear power stations concerned, allows continuous control of the whole nuclear fuel cycle, is based exclusively on existing methods and facilities, and can be implemented at low cost. (orig.) [de

  3. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  4. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  5. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Neena Isaac

    2 Central Water and Power Research Station, Khadakwasla, Pune 411024, India e-mail: ... deposition hydraulically by drawdown flushing is one of the most effective methods for restoring the storage ... hydraulic flushing system, detailed hydraulic model studies ..... important tool during the decision making at all the stages.

  6. assessment of slope stability around gilgel gibe-ii hydroelectric

    African Journals Online (AJOL)

    preferred customer

    1 Gilgel-Gibe II Hydroelectric Project, Fofa Town, Ethiopia ... Key words/phrases: Factor of safety, plane failure, slope design, slope .... condition of potential unstable slopes along the road between Fofa town and Gilgel-Gibe Hydro- power II.

  7. Core power distribution measurement and data processing in Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Hong

    1997-01-01

    For the first time in China, Daya Bay Nuclear Power Station applied the advanced technology of worldwide commercial pressurized reactors to the in-core detectors, the leading excore six-chamber instrumentation for precise axial power distribution, and the related data processing. Described in this article are the neutron flux measurement in Daya Bay Nuclear Power Station, and the detailed data processing

  8. Principle simulator for a PWR nuclear power station

    International Nuclear Information System (INIS)

    Wahlstroem, B.

    1975-05-01

    A report is given on a simulator developed for the training of operational and planning staff for the Lovisa nuclear power station in Finland. All main components of the power station are illustrated and trainees can operate the simulator in the power range 3-100 %. The model was originally developed for planning the control system of Lovisa I, for which reason the simulator project could be carried out on a relatively limited budget. (author)

  9. Distributed systems for protecting nuclear power stations

    International Nuclear Information System (INIS)

    Jover, P.

    1980-05-01

    The advantages of distributed control systems for the control of nuclear power stations are obviously of great interest. Some years ago, EPRI, (Electric Power Research Institute) showed that multiplexing the signals is technically feasible, that it enables the availability specifications to be met and costs to be reduced. Since then, many distributed control systems have been proposed by the manufacturers. This note offers some comments on the application of the distribution concept to protection systems -what should be distributed- and ends with a brief description of a protection system based on microprocessors for the pressurized power stations now being built in France [fr

  10. Station planning and design incorporating modern power system practice

    CERN Document Server

    Martin, PC

    1991-01-01

    The planning and design of new power stations can involve complex interaction between the many engineering disciplines involved as well as environmental, planning, economical, political and social pressures. This volume aims to provide a logical review of the procedures involved in power station development. The engineering aspects are outlined in detail, with examples, showing the basis of the relationships involved together with ""non-engineering"" factors so that the engineer can draw on the information provided for specific projects. The civil engineering and building of power stations are

  11. Application of ORC power station to increase electric power of gas compression ignition engine

    Directory of Open Access Journals (Sweden)

    Mocarski Szymon

    2017-01-01

    Full Text Available The paper presents the calculation results of efficiency of the subcritical low temperature ORC power station powered by waste heat resulting from the process of cooling a stationary compression ignition engine. The source of heat to supply the ORC power station is the heat in a form of water jet cooling the engine at a temperature of 92°C, and the exhaust gas stream at a temperature of 420°C. The study considers three variants of systems with the ORC power stations with different ways of using heat source. The first variant assumes using just engine cooling water to power the ORC station. In the second variant the ORC system is powered solely by a heat flux from the combustion gases by means of an intermediary medium - thermal oil, while the third variant provides the simultaneous management of both heat fluxes to heat the water stream as a source of power supply to the ORC station. The calculations were made for the eight working media belonging both to groups of so-called dry media (R218, R1234yf, R227ea and wet media (R32, R161, R152a, R134a, R22.

  12. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  13. Bidding Strategy of Virtual Power Plant with Energy Storage Power Station and Photovoltaic and Wind Power

    Directory of Open Access Journals (Sweden)

    Zhongfu Tan

    2018-01-01

    Full Text Available For the virtual power plants containing energy storage power stations and photovoltaic and wind power, the output of PV and wind power is uncertain and virtual power plants must consider this uncertainty when they participate in the auction in the electricity market. In this context, this paper studies the bidding strategy of the virtual power plant with photovoltaic and wind power. Assuming that the upper and lower limits of the combined output of photovoltaic and wind power are stochastically variable, the fluctuation range of the day-ahead energy market and capacity price is stochastically variable. If the capacity of the storage station is large enough to stabilize the fluctuation of the output of the wind and photovoltaic power, virtual power plants can participate in the electricity market bidding. This paper constructs a robust optimization model of virtual power plant bidding strategy in the electricity market, which considers the cost of charge and discharge of energy storage power station and transmission congestion. The model proposed in this paper is solved by CPLEX; the example results show that the model is reasonable and the method is valid.

  14. Inventory studies of hydroelectric power plants: the methodological differences for small and large power plants; Estudos de inventario de usinas hidreletricas: as diferencas metodologicas para pequenas e grandes centrais

    Energy Technology Data Exchange (ETDEWEB)

    Bajay, Sergio Valdir [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica. Dept. de Energia; Martinez, Carlos Barreira [Faculdade de Engenharia Civil de Itajuba, MG (Brazil)

    1992-12-31

    The hydroelectric potential handbook produced by ELETROBRAS provides procedures to guides the hydro power studies of river sites. In this paper, a critical analysis of these procedures is carried out, for both large and small hydro power plants, pin pointing the plant`s planning/design interface there, several proposals are put forward in the order to adapt these procedures to small hydro plants, optimizing their planning and design for the several situation, found in Brazilian reality. (author) 5 refs.

  15. Concept of underground nuclear power plant

    International Nuclear Information System (INIS)

    Onishi, Sotoaki

    1976-01-01

    The concept of constructing nuclear power plants on the sea or underground as the future sitting is based on moving the present power plants on the ground with actual results to the sea or underground without changing the design. The underground nuclear power plants have many similar points to underground hydro-electric power stations with many achievements in the construction viewpoint, though they have their proper difficult problems. Of course, it requires to excavate larger underground caves than the case of underground hydro-electric power plants. The maximum dimensions of the caves have been determined through experience in practice. Therefore the developments of design theory and construction technique are desirable in this field. In discussing underground construction, two evaluating methods are considered for the shielding effect of base rocks. The minimum vertical distance up to ground surface from the center of the cave differs depending upon the in-cave pressure, and the conditions of base rock, soil and underground water in case of the accident assumed in the design, and is approximately 60m, if the cave is assumed to be an indefinite cylindrical shape, by the safer side calculation in the above two evaluations. (Wakatsuki, Y.)

  16. The obtention of high reliability levels to the increasing of power in hydroelectric generators of modern power plants; A obtencao de altos indices de confiabilidade no aumento de potencia em hidrogeradores de usinas modernizadas

    Energy Technology Data Exchange (ETDEWEB)

    Goncalves, Octavio A.; Uemori, Mauro K.I.; Spiridon, Michel W. [Asea Brown Boveri Ltda., Osasco, SP (Brazil)

    1993-12-31

    The increase in the power capacity of the generators of existing hydroelectric power plants is presented as an alternative technically feasible and economically advantageous to the increase of the power generation capacity of the Brazilian electric power system. This work presents the need of a global analysis of each case in order to optimize this process and also presents a methodology which may be applied to electric power generators, turbines, transformers and other electrical equipment. 2 refs., 8 figs.

  17. Remerschen nuclear power station with BBR pressurized water reactor

    International Nuclear Information System (INIS)

    Hoffmann, J.P.

    1975-01-01

    On the basis of many decades of successful cooperation in the electricity supply sector with the German RWE utility, the Grand Duchy of Luxemburg and RWE jointly founded Societe Luxembourgeoise d'Energie Nucleaire S.A. (SENU) in 1974 in which each of the partners holds a fifty percent interest. SENU is responsible for planning, building and operating this nuclear power station. Following an international invitation for bids on the delivery and turnkey construction of a nuclear power station, the consortium of the German companies of Brown, Boveri and Cie. AG (BBC), Babcock - Brown Boveri Reaktor GmbH (BBR) and Hochtief AG (HT) received a letter of intent for the purchase of a 1,300 MW nuclear power station equipped with a pressurized water reactor. The 1,300 MW station of Remerschen will be largely identical with the Muelheim-Kaerlich plant under construction by the same consortium near Coblence on the River Rhine since early 1975. According to present scheduling, the Remerschen nuclear power station could start operation in 1981. (orig.) [de

  18. Report of the joint review panel : Glacier Power Ltd Dunvegan Hydroelectric Project, Fairview, Alberta

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-19

    This paper presented the results of a review of the Dunvegan hydroelectric project proposed for development on Alberta's Peace River. In addition to stating the project's purpose, viability, and benefits, the review examined the potential environmental and socio-economic impacts of the hydroelectric project and outlined conclusions developed through consultation with participants of public hearings. The review included a study of transmission lines needed for the project, and the likely impact of the hydroelectric plant on the Peace River fishery and ice regimes. Geotechnical issues related to slope stability, sedimentation and channel morphology, seismicity, and sedimentation in the region were analyzed. The impact of the project on wildlife, vegetation and forest resources was also examined. The study also examined impacts related to health and safety. Potential cumulative effects were reviewed, and First Nations and Metis concerns were outlined. It was concluded that impacts related to the construction, operation, and decommissioning of the project are not likely to be significant. tabs., figs.

  19. Proceedings of a workshop on dealing with uncertainties in the hydroelectric energy business. CD-ROM ed.

    International Nuclear Information System (INIS)

    2004-01-01

    This workshop was attended by experts in Canadian and international hydroelectric utilities to exchange information on current practices and opportunities for improvement or future cooperation. The discussions focused on reducing the uncertainties associated with hydroelectric power production. Although significant improvements have been made in the efficiency, reliability and safety of hydroelectric power production, the sector is still challenged by the uncertainty of water supply which depends greatly on weather conditions. Energy markets pose another challenge to power producers in terms of energy supply, energy demand and energy prices. The workshop focused on 3 themes: (1) weather and hydrologic uncertainty, (2) market uncertainty, and (3) decision making models using uncertainty principles surrounding water resource planning and operation. The workshop featured 22 presentations of which 11 have been indexed separately for inclusion in this database. refs., tabs., figs

  20. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    KEYWORDS: Constraints; craftsmen; funds; highlands; hydroelectric. INTRODUCTION ... MATERIAL AND METHODS. 1.1 Physical ... (Bamougoum; Bapi; Batotcha) are due to the use ... water very often escapes from the air vent because of its .... The funds raised will remedy ... Graw-Hill Book Company New York,. USA.

  1. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  2. Emergency protection and nuclear power station remote monitoring

    International Nuclear Information System (INIS)

    Nowak, K.; Wolf, H.

    1986-01-01

    The States of the Federal Republic of Germany are planning emergency protection measures for the environment of nuclear power stations based on their statutory duty of care. In this connection the paper explains to what extent remote monitoring of nuclear power stations practised by the Federal Supervisory Authorities may support the design and implementation of emergency protection measures. (orig.) [de

  3. Prospect and problems of gas based power stations of NTPC

    International Nuclear Information System (INIS)

    Suryanarayana, A.

    1993-01-01

    The policy of the Government of India concerning utilisation of natural gas resources of the country has undergone changes over the last few years. The government decided in 1985 to allocate natural gas for power generation and in the year 1986 approved the setting up of the first series of three gas based combined cycle power projects of National Thermal Power Corporation (NTPC). The problems of gas power stations of NTPC are discussed. These are high cost of generation, completion of transmission line works to match with the commissioning of gas power stations, high price of natural gas, and fixation of tariff for sale of power from gas based power stations. (N.B.)

  4. Review of radioactive discharges from nuclear power stations

    International Nuclear Information System (INIS)

    1991-02-01

    HM Inspectorate of Pollution commissioned, with authorising responsibilities in England and Wales, a study into the discharges of radioactive effluents from Nuclear Power Stations. The study considered arisings from nuclear power stations in Europe and the USA and the technologies to treat and control the radioactive discharges. This report is a review of the arisings and concludes that suitable technologies exist, which if applied, could reduce discharges from nuclear power plants in England and Wales in line with the rest of Europe. (author)

  5. Complex Mobile Independent Power Station for Urban Areas

    Science.gov (United States)

    Tunik, A. A.; Tolstoy, M. Y.

    2017-11-01

    A new type of a complex mobile independent power station developed in the Department of Engineering Communications and Life-Support Systems of Irkutsk National Research Technical University, is presented in this article. This station contains only solar panel, wind turbine, accumulator, diesel generator and microbial fuel cell for to produce electric energy, heat pump and solar collector to generate heat energy and also wastewater treatment plant and new complex control system. The complex mobile independent power station is intended for full power supply of a different kind of consumers located even in remote areas thus reducing their dependence from centralized energy supply systems, decrease the fossil fuel consumption, improve the environment of urban areas and solve the problems of the purification of industrial and municipal wastewater.

  6. Shippingport Atomic Power Station. Quarterly operating report, third quarter 1978

    Energy Technology Data Exchange (ETDEWEB)

    Jones, T. D.

    1978-01-01

    A loss of ac power to the station occurred on July 28, 1978 caused by an interaction between Beaver Valley Power Station and Shippingport Atomic Power Station when the main transformer of Unit No. 1 of the Beaver Valley Power Station developed an internal failure and tripped the BVPS. Two environmental studies were continued this quarter. The first involves reduction of main unit condenser chlorination and the second, river intake screen fish impingement sampling. There were no radioactive liquid discharges from the Radioactive Waste Processing System to the river this quarter. During the third quarter of 1978, 874 cubic feet of radioactive solid waste was shipped out of state for burial. At the end of the quarter, the Fall shutdown continued with the plant heated up, the main turbine on turning gear and plant testing in progress prior to Station startup.

  7. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark

    International Nuclear Information System (INIS)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-01-01

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs

  8. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  9. Services for nuclear power stations

    International Nuclear Information System (INIS)

    Fremann, M.; Ryckelynck

    1987-01-01

    This article gives an information as complete as possible about the activities of the french nuclear industry on the export-market. It describes the equipment and services available in the field of services for nuclear power stations [fr

  10. Mercury emissions from South Africa’s coal-fired power stations

    Directory of Open Access Journals (Sweden)

    Belinda L. Garnham

    2016-12-01

    Full Text Available Mercury is a persistent and toxic substance that can be bio-accumulated in the food chain. Natural and anthropogenic sources contribute to the mercury emitted in the atmosphere. Eskom’s coal-fired power stations in South Africa contributed just under 93% of the total electricity produced in 2015 (Eskom 2016. Trace amounts of mercury can be found in coal, mostly combined with sulphur, and can be released into the atmosphere upon combustion. Coal-fired electricity generation plants are the highest contributors to mercury emissions in South Africa. A major factor affecting the amount of mercury emitted into the atmosphere is the type and efficiency of emission abatement equipment at a power station. Eskom employs particulate emission control technology at all its coal-fired power stations, and new power stations will also have sulphur dioxide abatement technology. A co-beneficial reduction of mercury emissions exists as a result of emission control technology. The amount of mercury emitted from each of Eskom’s coal-fired power stations is calculated, based on the amount of coal burnt and the mercury content in the coal. Emission Reduction Factors (ERF’s from two sources are taken into consideration to reflect the co-benefit received from the emission control technologies at the stations. Between 17 and 23 tons of mercury is calculated to have been emitted from Eskom’s coal-fired power stations in 2015. On completion of Eskom’s emission reduction plan, which includes fabric filter plant retrofits at two and a half stations and a flue gas desulphurisation retrofit at one power station, total mercury emissions from the fleet will potentially be reduced by 6-13% by 2026 relative to the baseline. Mercury emission reduction is perhaps currently not the most pressing air quality problem in South Africa. While the focus should then be on reducing emissions of other pollutants which have a greater impact on human health, mercury emission reduction

  11. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  12. Decommissioning of nuclear power stations

    International Nuclear Information System (INIS)

    Gregory, A.R.

    1988-01-01

    In the United Kingdom the Electricity Boards, the United Kingdom Atomic Energy Authority (UKAEA) and BNFL cooperate on all matters relating to the decommissioning of nuclear plant. The Central Electricity Generating Board's (CEGB) policy endorses the continuing need for nuclear power, the principle of reusing existing sites where possible and the building up of sufficient funds during the operating life of a nuclear power station to meet the cost of its complete clearance in the future. The safety of the plant is the responsibility of the licensee even in the decommissioning phase. The CEGB has carried out decommissioning studies on Magnox stations in general and Bradwell and Berkeley in particular. It has also been involved in the UKAEA Windscale AGR decommissioning programme. The options as to which stage to decommission to are considered. Methods, costs and waste management are also considered. (U.K.)

  13. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  14. Design of photovoltaic central power station concentrator array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using tracking concentrators has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes an advanced Martin Marietta two-axis tracking fresnel lens concentrator. The concentrators are arrayed in 5 MW subfields, each with its own power conditioning unit. The photovoltaic plant output is connected to the existing 115 kV switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  15. Socioeconomic impacts: nuclear power station siting

    International Nuclear Information System (INIS)

    1977-06-01

    The rural industrial development literature is used to gain insights on the socioeconomic effects of nuclear power stations. Previous studies of large industrial facilities in small towns have important implications for attempts to understand and anticipate the impacts of nuclear stations. Even a cursory review of the nuclear development literature, however, reveals that industrialization research in rural sociology, economic geography and agricultural economics has been largely ignored

  16. Ash Deposition Trials at Three Power Stations in Denmark

    DEFF Research Database (Denmark)

    Laursen, Karin; Frandsen, Flemming; Larsen, Ole Hede

    1998-01-01

    Six full-scale trials were conducted at three power stations in Denmark: Ensted, Funen, and Vendsyssel power stations. During these trials, pulverized coal, bottom ash, fly ash, and deposits from cooled probes were sampled and analyzed with various techniques. On the basis of SEM analyses...

  17. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  18. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    in which it thinks to meet the projections. When the foreseen contribution of our HE installed power to our total installed power and that of our HE energy production to our total energy production for 2005-2020 period is analysed, it is seen that it is foreseen that these contributions are not to be changing at significant levels for the coming 15 years. It has not been possible to explain the fact that 2/3 of our hydroelectric potential, which is independent of foreign countries, is not yet evaluated and the fact that no attempt is made to increase its contribution. This situation should be perceived as an unusual approach in our country.

  19. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  20. Human reliability analysis of Lingao Nuclear Power Station

    International Nuclear Information System (INIS)

    Zhang Li; Huang Shudong; Yang Hong; He Aiwu; Huang Xiangrui; Zheng Tao; Su Shengbing; Xi Haiying

    2001-01-01

    The necessity of human reliability analysis (HRA) of Lingao Nuclear Power Station are analyzed, and the method and operation procedures of HRA is briefed. One of the human factors events (HFE) is analyzed in detail and some questions of HRA are discussed. The authors present the analytical results of 61 HFEs, and make a brief introduction of HRA contribution to Lingao Nuclear Power Station

  1. Watermill and Small-Scale Hydroelectric Power Plant Landscapes Assessed According to Ecological Aspects

    Directory of Open Access Journals (Sweden)

    Lilita Lazdāne

    2013-10-01

    Full Text Available Research of watermill and small-scale hydroelectric power plant (HPP landscapes in Latvia according to ecological aspects is a part of a more complex research. The aim of this research is to examine the existing situation of watermill and small-scale HPP landscapes in Latvia by applying the ecological assessment criteria, and then try to formulate a definition of common tendencies of the landscape character. This paper provides a landscape inventory matrix for research in the field stu­dies of landscape identification at the local planning level. The duration of the research was from 2010 to 2012. The research includes 42 territories starting with the three most densely developed areas in Latvia: in Latgale, Kurzeme and Vidzeme uplands distribution ranges. The research results reflect tendencies of the landscape features assessed according to the previously developed criteria of ecological aspects.

  2. Optimization of the operating conditions of gas-turbine power stations considering the effect of equipment deterioration

    Science.gov (United States)

    Aminov, R. Z.; Kozhevnikov, A. I.

    2017-10-01

    In recent years in most power systems all over the world, a trend towards the growing nonuniformity of energy consumption and generation schedules has been observed. The increase in the portion of renewable energy sources is one of the important challenges for many countries. The ill-predictable character of such energy sources necessitates a search for practical solutions. Presently, the most efficient method for compensating for nonuniform generation of the electric power by the renewable energy sources—predominantly by the wind and solar energy—is generation of power at conventional fossil-fuel-fired power stations. In Russia, this problem is caused by the increasing portion in the generating capacity structure of the nuclear power stations, which are most efficient when operating under basic conditions. Introduction of hydropower and pumped storage hydroelectric power plants and other energy-storage technologies does not cover the demand for load-following power capacities. Owing to a simple design, low construction costs, and a sufficiently high economic efficiency, gas turbine plants (GTPs) prove to be the most suitable for covering the nonuniform electric-demand schedules. However, when the gas turbines are operated under varying duty conditions, the lifetime of the primary thermostressed components is considerably reduced and, consequently, the repair costs increase. A method is proposed for determination of the total operating costs considering the deterioration of the gas turbine equipment under varying duty and start-stop conditions. A methodology for optimization of the loading modes for the gas turbine equipment is developed. The consideration of the lifetime component allows varying the optimal operating conditions and, in some cases, rejecting short-time stops of the gas turbine plants. The calculations performed in a wide range of varying fuel prices and capital investments per gas turbine equipment unit show that the economic effectiveness can

  3. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  4. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  5. Fiscal 2000 report on the international joint verification of photovoltaic power generation system. Verification of hybrid system comprising photovoltaic power generation system and micro-hydroelectric power generation systems; 2000 nendo taiyoko hatsuden system kokusai kyodo jissho kaihatsu hokokusho. Taiyoko micro suiryoku hybrid system jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-06-01

    Research was conducted in Vietnam for the development of a hybrid system comprising a photovoltaic power generation system and a micro-hydroelectric power generation system. In verification test operation, data measurement had been under way for approximately 18 months since it was started in September 1999. The rate of days on which effective data were obtained throughout this period was 93.4%. Power generated by the micro-hydroelectric power generation system was 19.4kWh/d with so small a capacity factor of 3.2%. The capacity factor of the photovoltaic power generation system was again very small at 4.5% since the amount consumed by the load was as small as 131.0kWh/d. Weather data of solar radiation and precipitation were being collected smoothly. In the study of hybrid system optimization, the effect of inductor generator activation upon the inverter was taken up. In the study of capacity balance optimization between the constituent elements of the hybrid system, methodology was established and verified, and calculations were carried out. (NEDO)

  6. Tarapur Atomic Power Station - - an overview of experience

    International Nuclear Information System (INIS)

    Shah, J.C.

    1979-01-01

    A broad overview of the experience and performance of the Tarapur Atomic Power Station (TAPS) in its role as the developing world's first foray in commercial atomic power has been attempted. The prime objective was not just generation of power but assimilation of an advanced technology on an economically viable basis in the underdeveloped environment compounded with governmental organisational culture. Scientific and technical advances registered through the TAPS experience in the area of design, operation and maintenance are mentioned. Aspects of station performance, management and even economics are also covered. (auth.)

  7. Electric machinery and drives in thermal power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The following subjects were dealt with during the VDE meeting: 1) Requirements made by the electric network on the generators and their excitation equipment, and the influence thereof on their design; 2) requirements made by the power station process on the electric drives and the influence thereof on type and design; 3) requirements made on protective measures from the point of the electric power station machinery. (TK) [de

  8. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  9. Situation and future developments in the power station engineering of the GDR

    International Nuclear Information System (INIS)

    Effenberger, H.; Weidlich, H.G.

    1990-01-01

    Starting with the present state of power stations in the GDR and their evaluation in respect of energy and ecology, the authors have developed a concept for the future objectives and possibilities of the power stations. With regard to the modification of the power station engineering, considered as urgently required due to reasons of energy and environment, there was suggestions for modern plant conceptions, such as fluidized bed combustors, combined and gas/steam power plants, besides the retrofitting and the new building of proven conventional plants. It includes also the extension of combined heat and power systems, of nuclear energy, and the use of regenerative energy sources as parts of this concept. The power station modifications intended are shown in tables for the various power station locations. (orig.) [de

  10. A modular Space Station/Base electrical power system - Requirements and design study.

    Science.gov (United States)

    Eliason, J. T.; Adkisson, W. B.

    1972-01-01

    The requirements and procedures necessary for definition and specification of an electrical power system (EPS) for the future space station are discussed herein. The considered space station EPS consists of a replaceable main power module with self-contained auxiliary power, guidance, control, and communication subsystems. This independent power source may 'plug into' a space station module which has its own electrical distribution, control, power conditioning, and auxiliary power subsystems. Integration problems are discussed, and a transmission system selected with local floor-by-floor power conditioning and distribution in the station module. This technique eliminates the need for an immediate long range decision on the ultimate space base power sources by providing capability for almost any currently considered option.

  11. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  12. 47 CFR 74.707 - Low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.707 Low power TV and TV translator station protection. (a)(1) A low power TV or TV translator will be protected from interference from other...

  13. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1997-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  14. Overhaul of the generator of the hydroelectric central station Ingeniero Carlos Ramirez Ulloa; Rehabilitacion del generador de la unidad 2 de la central hidroelectrica ingeniero Carlos Ramirez Ulloa

    Energy Technology Data Exchange (ETDEWEB)

    Robles Pimentel, Edgar [Instituto de Investigaciones Electricas, Cuernavaca (Mexico); Garcia Hernandez, Javier [Comision Federal de Electricidad, Mexico, D. F. (Mexico)

    1998-12-31

    In November 1995, the failure of the Unit 2 generator at the hydroelectric central station Ingeniero Carlos Ramirez Ulloa, El Caracol, occurred. The accident forced to carry out its overhaul. Here are presented the technical problems faced during the overhaul of the generator and analyzed the implemented solutions. [Espanol] En noviembre de 1995 ocurrio la falla del generador de la unidad 2 de la central hidroelectrica Ing. Carlos Ramirez Ulloa, El Caracol. El accidente obligo a llevar a cabo su rehabilitacion. Se presentan los problemas tecnicos enfrentados durante la rehabilitacion del generador y se discuten las soluciones implementadas.

  15. Modernization of Henry Borden hydroelectric power plant: The ELETROPAULO`s, The Electric Power Company of Sao Paulo State, experience in no.1 generator power improvement; Modernizacao da Usina Henry Borden (a experiencia da ELETROPAULO na repotenciacao do gerador nr. 1)

    Energy Technology Data Exchange (ETDEWEB)

    Delbone, Edval; Matos, Jose Alberto da S.; Grassi, Marco A; Oliveira, Robinson C; Sertori, Sergio R [Eletricidade de Sao Paulo SA, SP (Brazil); Duarte, F I; Pires, Nilo Ramos; Yamagushi, Luiz Massao [Asea Brown Boveri (ABB) (Brazil)

    1996-12-31

    The need for the substitution of several the generating equipment of Henry Borden hydroelectric power plant due to the end of their service life, in addition to the difficult economic situation and specific characteristics of the unit, leaded ELETROPAULO company to decide for the power improvement of some equipment. This work presents this experience giving special emphasis to the procedure adopted and results obtained 2 tabs.

  16. The economic consequences of the Sizewell 'B' nuclear power station

    International Nuclear Information System (INIS)

    Fothergill, S.; Gudgin, G.; Mason, N.

    1983-01-01

    The subject is covered in chapters, entitled: introduction (the background to Sizewell 'B'); policy options (Sizewell 'B'; a new coal-fired station; the no-new-station option; a PWR programme); economic framework (direct effects; financing; final macroeconomic effects); the construction phase (capital costs; direct effects; final effects; summary); the operating phase (a new power station as a replacement for older stations; the period of base-load operation; the later years of operation; summary); conclusions and policy recommendations. The first recommendation is that if a new power station is built it should be a coal-fired station rather than a PWR. The second recommendation is that if a new coal station is built there is a case for building it early, ahead of demand. (U.K.)

  17. Hydroelectric power generation in an Alpine basin: future water-energy scenarios in a run-of-the-river plant

    Science.gov (United States)

    Bongio, Marco; Avanzi, Francesco; De Michele, Carlo

    2016-08-01

    We investigate scenarios of hydroelectric power generation for an Alpine run-of-the-river plant in 2050. To this end, we include a conversion from streamflow to energy in a hydrological model of the basin, and we introduce a set of benchmark climate scenarios to evaluate expected future production. These are a "future-like-present" scenario assuming future precipitation and temperature inputs to be statistically equivalent to those observed during the recent past at the same location, a "warmer-future" scenario, which considers an additional increase in temperature, and a "liquid-only" scenario where only liquid precipitation is admitted. In addition, two IPCC-like climatic scenarios (RCP 4.5 and RCP 8.5) are considered. Uncertainty in glaciers' volume is accounted by initializing the hydrological model with two different inventories of glaciers. Ensemble results reveal that 1) an average decrease between -40% and -19% of hydroelectric power generation in 2050 is predicted at the plant considered (with respect to present condition); 2) an average decrease between -20% and -38% of cumulative incoming streamflow volume at the plant is also predicted, again with respect to present condition; 3) these effects are associated with a strong average decrease of the volume of glaciers (between -76% and -96%, depending on the initial value considered). However, Monte Carlo simulations show that results are also prone to high uncertainties. Implications of these results for run-of-the-river plants are discussed.

  18. Investigations of the vegetation along the river Laagen in connection with expansion of the Lower Vinstra Power Station; Vegetasjonsundersoekelser i Laagen i forbindelse med utvidelse av Nedre Vinstra kraftverk

    Energy Technology Data Exchange (ETDEWEB)

    Brandrud, T.E.; Mjelde, M [Norsk Inst. for Vannforskning, Oslo (Norway); Bendiksen, E. [Norsk Inst. for Naturforskning, Trondheim (Norway)

    1996-05-01

    To qualify for a licence to expand, the Norwegian hydroelectric power plant Lower Vinstra Power Station had to perform botanical investigations of the aquatic and riverside vegetation (riparian vegetation) along the affected part of the river Gudbrandsdalslaagen, between Harpefoss and Faavang. The investigations took place in 1990-1994 and is described in the present report. The riverside vegetation was stable throughout the entire period, overgrowing weakly. The aquatic vegetation exibited greater fluctuations, including episodic decline in unstable areas. Aquatic vegetation declined and vanished in areas with large as well as with little diurnal variation of the water level, which is primarily due to flooding episods. Erosion or essential changes in aquatic or riverside vegetation caused by increased diurnal regulation (HEP regulations) cannot be demonstrated with any great probability. 13 refs., 14 figs., 8 tabs.

  19. Station black out of Fukushima Daiichi Nuclear Power Station Unit 1 was not caused by tsunamis

    International Nuclear Information System (INIS)

    Ito, Yoshinori

    2013-01-01

    Station black out (SBO) of Fukushima Daiichi Nuclear Power Station Unit 1 would be concluded to be caused before 15:37 on March 11, 2011 because losses of emergency ac power A system was in 15:36 and ac losses of B system in 15:37 according to the data published by Tokyo Electric Power Co. (TEPCO) in May 10, 2013. Tsunami attacked the site of Fukushima Daiichi Nuclear Power Station passed through the position of wave amplitude meter installed at 1.5 km off the coast after 15:35 and it was also recognized tsunami arrived at the coast of Unit 4 sea side area around in 15:37 judging from a series of photographs taken from the south side of the site and general knowledge of wave propagation. From a series of photographs and witness testimony, tsunami didn't attack Fukushima Daiichi Nuclear Power Station uniformly and tsunami's arrival time at the site of Unit 1 would be far later than arrival time at the coast of Unit 4 sea side area, which suggested it would be around in 15:39. TEPCO insisted tsunami passed through 1.5 km off the coast around in 15:33 and clock of wave amplitude meter was incorrect, which might be wrong. Thus SBO of Fukushima Daiichi Nuclear Power Station Unit 1 occurred before tsunami's arrival at the site of Unit 1 and was not caused by tsunami. (T. Tanaka)

  20. Design Provisions for Withstanding Station Blackout at Nuclear Power Plants

    International Nuclear Information System (INIS)

    2015-08-01

    International operating experience has shown that the loss of off-site power supply concurrent with a turbine trip and unavailability of the standby alternating current power system is a credible event. Lessons learned from the past and recent station blackout events, as well as the analysis of the safety margins performed as part of the ‘stress tests’ conducted on European nuclear power plants in response to the Fukushima Daiichi accident, have identified the station blackout event as a limiting case for most nuclear power plants. The magnitude 9.0 earthquake and consequential tsunami which occurred in Fukushima, Japan, in March 2011, led to a common cause failure of on-site alternating current electrical power supply systems at the Fukushima Daiichi nuclear power plant as well as the off-site power grid. In addition, the resultant flooding caused the loss of direct current power supply, which further exacerbated an already critical situation at the plant. The loss of electrical power resulted in the meltdown of the core in three reactors on the site and severely restricted heat removal from the spent fuel pools for an extended period of time. The plant was left without essential instrumentation and controls, and this made accident management very challenging for the plant operators. The operators attempted to bring and maintain the reactors in a safe state without information on the vital plant parameters until the power supply was eventually restored after several days. Although the Fukushima Daiichi accident progressed well beyond the expected consequences of a station blackout, which is the complete loss of all alternating current power supplies, many of the lessons learned from the accident are valid. A failure of the plant power supply system such as the one that occurred at Fukushima Daiichi represents a design extension condition that requires management with predesigned contingency planning and operator training. The extended loss of all power at a

  1. The 'electric power' experience: Between nostalgia and the future. Erlebnis 'Strom' zwischen Nostalgie und Zukunft

    Energy Technology Data Exchange (ETDEWEB)

    Moergeli, H.P. (Moergeli und Partner, Muri bei Bern (Switzerland))

    1994-03-04

    The ''Muehleberg'' is a concept which is mostly used in connection with the nuclear power station. But there is more to the ''Muehleberg'' than at first sight. A hydroelectric station, a waste dump gas plant and the brandnew works management centre of the Bernische Kraftwerke AG (BKW) constitute the framework for a host of other attractions in the field of electric power; among others, examples of technological culture in the BKW museum, which are worth seeing. (orig.)

  2. Potential hydroelectric power. Vertical turbine: spillway combine Broadwater Dam. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Willer, D.C.

    1979-04-23

    A feasibility study was made of the hydroelectric power potential at Broadwater Dam in western Montana. Two alternative configurations for the potential project were evaluated and the economics of four possible sources of project funding were assessed. The configurations analyzed were an apron-mounted configuration, in which the turbine-generator units are located on the downstream apron of the existing dam, and a conventional configuration, in which the units are located in a new powerhouse adjacent to the existing dam. The funding sources considered were the Department of Energy loan program, the United States Bureau of Reclamation PL-984 loan program and conventional revenue bonds, both taxable and tax-exempt. The optimal project alternative was determined to be the apron-mounted configuration. The final choice of funding would be dependent on the power purchaser. It was shown that, regardless of the configuraton or funding source selected, the project would be feasible. The cost of the apron-mounted configuration, which would consist of four turbine-generator units for a total installed capacity of 9.76 MW, was estimated as $13,250,000 with financing provided by either a PL-984 loan or tax-exempt bonds. The cost per installed kilowatt was therefore $1,350, and the cost per kilowatt-hour was 19.6 mills. The average annual energy was estimated to be 56.44 million kWh, the equivalent of approximately 87,000 barrels of oil per y. It is therefore recommended that the Montana Department of Natural Resources and Conservation proceed with the project and that discussions be initiated with potential power purchasers as soon as possible.

  3. Experience of Minas Gerais Energetic Company (CEMIG) in feasibility studies from hydroelectric power plants: energetic-economic studies

    International Nuclear Information System (INIS)

    Ramos, O.C.; Bras, A.J.F.; Batista Neto, R.P.; Salles Filho, M.P.

    1989-01-01

    The experience of Minas Gerais Energetic Company (CEMIG) - Brazil, on the use of dimensioning methodology for hydroelectric power plant from the Coordinated Group of Planning System was described, showing the problems with its use and the solutions, mainly the reservoir and the dimension of installed potential. It was concluded that the calculation procedures of the marginal costs for dimensioning, so as to become these costs more representative in future structure of the Brazilian generator park and less dependent to the oscillation due to conjuncture problems, must be re-evaluated. (C.G.C.). 7 refs, 3 figs, 1 tab

  4. Nuclear power stations in August: information and commentary

    International Nuclear Information System (INIS)

    Rogozhin, Yu.

    1989-01-01

    A summary of events at nuclear power stations in the USSR in August 1989 is given. There were 44 nuclear power units in service which had 9 unplanned shutdowns and 13 unsanctioned power reductions. Gosatomenergonadzor SSSR is also responsible for all research and marine reactors. It is reported that there are currently (1989) six nuclear vessels in the USSR and no major accidents or damage to nuclear steam-generating units on these were reported. On-site inspectors maintain a constant presence at nuclear power stations to supervise operation and make sure safety requirements are enforced. Glasnost is opening up previously forbidden areas to the public to enable it to obtain information to allow objective assessment to be made. (author)

  5. Argentinian experience in selecting sites for nuclear power stations

    International Nuclear Information System (INIS)

    Csik, B.J.

    1975-01-01

    One nuclear power station is in operation in the Republic of Argentina, a second is under construction, and the decision to build a third has been taken. According to existing plans, about ten nuclear power stations should go into operation during the next decade. The present paper analyses the experience acquired in selecting sites for the first units, commenting on the criteria and methods applied, the studies that were carried out, the specific problems encountered and the solutions adopted, as well as on the question of acceptance of the chosen sites by the public. It goes on to describe the current programme of selection and study of sites for future nuclear power stations

  6. Aseismic foundation system for nuclear power stations

    International Nuclear Information System (INIS)

    Jolivet, F.; Richli, M.

    1977-01-01

    The aseismic foundation system, as described in this paper, is a new development, which makes it possible to build standard nuclear power stations in areas exposed to strong earthquakes. By adopting proven engineering concepts in design and construction of components, great advantages are achieved in the following areas: safety and reliability; efficiency; design schedule; cost. The need for an aseismic foundation system will arise more and more, as a large part of nuclear power station sites are located in highly seismic zones or must meet high intensity earthquake criteria due to the lack of historic data. (Auth.)

  7. Bioremediation for coal-fired power stations using macroalgae.

    Science.gov (United States)

    Roberts, David A; Paul, Nicholas A; Bird, Michael I; de Nys, Rocky

    2015-04-15

    Macroalgae are a productive resource that can be cultured in metal-contaminated waste water for bioremediation but there have been no demonstrations of this biotechnology integrated with industry. Coal-fired power production is a water-limited industry that requires novel approaches to waste water treatment and recycling. In this study, a freshwater macroalga (genus Oedogonium) was cultivated in contaminated ash water amended with flue gas (containing 20% CO₂) at an Australian coal-fired power station. The continuous process of macroalgal growth and intracellular metal sequestration reduced the concentrations of all metals in the treated ash water. Predictive modelling shows that the power station could feasibly achieve zero discharge of most regulated metals (Al, As, Cd, Cr, Cu, Ni, and Zn) in waste water by using the ash water dam for bioremediation with algal cultivation ponds rather than storage of ash water. Slow pyrolysis of the cultivated algae immobilised the accumulated metals in a recalcitrant C-rich biochar. While the algal biochar had higher total metal concentrations than the algae feedstock, the biochar had very low concentrations of leachable metals and therefore has potential for use as an ameliorant for low-fertility soils. This study demonstrates a bioremediation technology at a large scale for a water-limited industry that could be implemented at new or existing power stations, or during the decommissioning of older power stations. Copyright © 2015 Elsevier Ltd. All rights reserved.

  8. Experience gained in the operation of the Beznau nuclear power station

    International Nuclear Information System (INIS)

    Kueffer, K. von.

    1976-01-01

    The 24th December 1969, when the Beznau 1 nuclear power station was placed in commercial operation, marked the beginning of electricity production from nuclear energy in Switzerland. Beznau 2 followed on the 15th March 1972. Together with the Muehleberg nuclear power station, nuclear energy accounts for approximately 20 percent of the total electricity production in Switzerland. Until the end of 1975, Switzerland's three nuclear power stations had a mean energy utilisation factor of 71.3 percent which, as compared with a mean energy utilization factor of 60.5 percent for all the nuclear power stations in the West, suggests fairly good operational results. Problems that arose during operation are discussed in detail. By way of summary it is stated that the operation of the Beznau nuclear power station has so far proved a success. The production of electrical energy has always remained within the limits imposed by the law and by the safety aspects. (Auth.)

  9. Herpetofauna, Santa Edwiges I and II hydroelectric power plants, state of Goiás, Brazil

    Directory of Open Access Journals (Sweden)

    Cintra, C. E. D.

    2009-01-01

    Full Text Available This paper presents a check list of amphibians and reptiles of the area under the influence of Santa Edwiges I and IIsmall hydroelectric power plants on Rio Buritis, state of Goiás, Brazil. The list was the result of faunal rescueoperations carried out between 31 August and 29 September 2005 (Santa Edwiges II and between 30 July and 12September 2006 (Santa Edwiges I. The list comprises 30 species of amphibians belonging to 16 genera and 8 families(Caeciliidae, Bufonidae, Cycloramphidae, Hylidae, Brachycephalidae, Leiuperidae, Leptodactylidae, andMicrohylidae, and 45 species of reptiles belonging to 38 genera and 16 families (Amphisbaenidae, Anguidae,Gekkonidae, Gymnophtalmidae, Polychrotidae, Scincidae, Teiidae, Tropiduridae, Anomalepididae, Leptotyphlopidae,Typhlopidae, Boidae, Colubridae, Dipsadidae, Elapidae, and Viperidae.

  10. Present status of maintenance in nuclear power stations

    International Nuclear Information System (INIS)

    Fueki, Kensuke

    1982-01-01

    For nuclear power stations, the improvement of the rate of facility utilization is indispensable. As its means, the shortening of regular inspection period, the adoption of long term cycle operation, the shortening of plant shutdown period by the improvement of the reliability of installed equipment and so on are conceivable. In this paper, the maintenance techniques in nuclear power stations which constitute the basis of reliability improvement are explained. In nuclear power stations, the use of nuclear fuel, accordingly the existence of radioactivity are the remarkable features. At the time of an accident, the nuclear reaction in a reactor must be stopped, and the excessive heat must be removed. The radioactivity in nuclear fuel must not be released outside. The regular inspection of once a year is provided by the law, and routine tests are performed during normal operation. The check-up by operators also is a part of the safety measures. For the early detection of abnormality, the diagnosis system is developed, and the maintenance techniques during operation are examined for being taken into the safety test and standard. The improvement of reliability is attempted by the redundancy of systems. The activity of quality assurance, the organization for the maintenance of nuclear power stations and maintenance works, and the measures to raise the rate of operation are reported. (Kako, I.)

  11. Care management at Ikata Power Station

    International Nuclear Information System (INIS)

    Sakai, Koji

    1982-01-01

    For operating nuclear power stations safely and economically, it is necessary to control nuclear fuel itself and reactor cores. Nuclear fuel must be controlled consistently in view of quantitative balance and operational method over the whole nuclear fuel cycle of uranium ore, fabrication, burning in reactors and reprocessing, based on the plan of using fuel in electric power companies. The control of the burning in reactors is called core management, and it is important because the users of fuel execute it. For dealing with such core management works, Shikoku Electric Power Co., Inc., has developed the computer code system for grasping the state of fuel exchange and the burning condition in reactors and used it since 1972. The outline of the core management in Ikata Power Station is reported in this paper centering around computing works. The core management works are divided into those at the time of regular inspection and those in operation. In the regular inspection, fuel inspection, fuel exchange and reactor physics test are performed. In operation, the burning condition of fuel is grasped. The technical computations corresponding to these works are explained, and the examples of computations are shown. (Kako, I.)

  12. Sizewell B Power Station control dosimetry system

    International Nuclear Information System (INIS)

    Renn, G.

    1995-01-01

    Sizewell B Power Station is the first Pressurized Water Reactor (PWR) built in the UK for commercial electricity production. An effective control dosimetry system is a crucial tool, in allowing the station to assess its radiological performance against targets. This paper gives an overview of the control dosimetry system at Sizewell B and describes early operating experience with the system. (UK)

  13. Risk of loss power for ATWT in Daya Bay and Ling'ao nuclear power stations

    International Nuclear Information System (INIS)

    Guo Cheng

    2010-01-01

    In order to analyze the differences between the Anticipated Transient Without Reactor Trip (ATWT) and other reactor protection methods, this paper analyzes in detail the realizing means of ATWT and the effect of lost of power supply on the units based on Daya Bay and Ling'ao Nuclear Power Stations by system wiring diagram. Based on the comprehensive analysis,this paper proposes the sequence for powering when recovering the power source after ATWT power supply (LCC/LNE) loss for Daya Bay and Ling'ao Nuclear Power Stations. (authors)

  14. Environmental analysis report for the hydroelectric project on the Sheldrake River in the Courbe du Sault section in the municipality of Riviere-au-Tonnerre by the Societe d'energie riviere Sheldrake Inc

    International Nuclear Information System (INIS)

    Michaud, A.; Paul, M.; Brunet, G.

    2010-01-01

    The Societe d'energie riviere Sheldrake Inc. (SERS Inc.) is planning to exploit the hydroelectric potential of the Sheldrake River in the Quebec municipality of Riviere au Tonnere. The proposed project will involve building a hydroelectric power station with a maximum capacity of 25 MW on the Sheldrake River, in the Courbe du Sault section. The project will also comprise a dam, a water reservoir and an overflow spillway. The project meets the province's 2006-2015 energy strategy to develop small-scale hydroelectric facilities. The project was subject to an environmental assessment as required by the province of Quebec. This environmental analysis addressed the major challenges facing the hydroelectric development at the Courbe du Sault section of the River, notably the impact on fish habitat, wetlands and the local and regional economic benefits. The environmental assessment did not indicate any habitat destruction for trout or salmon in the forebay. The Quebec Ministry of Sustainable Development, Environment and Parks has deemed the project to be acceptable given that certain conditions are met, including thresholds to stabilize the water level and the construction of a downstream fish passage facility to allow for safe fish migration. 22 refs., 2 tabs., 5 figs., 3 appendices.

  15. Research on application of knowledge engineering to nuclear power stations

    International Nuclear Information System (INIS)

    Umeda, Takeo; Kiyohashi, Satoshi

    1990-01-01

    Recently, the research on the software and hardware regarding knowledge engineering has been advanced eagerly. Especially the applicability of expert systems is high. When expert systems are introduced into nuclear power stations, it is necessary to make the plan for introduction based on the detailed knowledge on the works in nuclear power stations, and to improve the system repeatedly by adopting the opinion and request of those in charge upon the trial use. Tohoku Electric Power Co. was able to develop the expert system of practically usable scale 'Supporting system for deciding fuel movement procedure'. The survey and analysis of the works in nuclear power stations, the selection of the system to be developed and so on are reported. In No. 1 plant of Onagawa Nuclear Power Station of BWR type, up to 1/3 of the fuel is replaced at the time of the regular inspection. Some fuel must be taken to outside for ensuring the working space. The works of deciding fuel movement procedure, the development of the system and its evaluation are described. (K.I.)

  16. Measurements and modelling of base station power consumption under real traffic loads.

    Science.gov (United States)

    Lorincz, Josip; Garma, Tonko; Petrovic, Goran

    2012-01-01

    Base stations represent the main contributor to the energy consumption of a mobile cellular network. Since traffic load in mobile networks significantly varies during a working or weekend day, it is important to quantify the influence of these variations on the base station power consumption. Therefore, this paper investigates changes in the instantaneous power consumption of GSM (Global System for Mobile Communications) and UMTS (Universal Mobile Telecommunications System) base stations according to their respective traffic load. The real data in terms of the power consumption and traffic load have been obtained from continuous measurements performed on a fully operated base station site. Measurements show the existence of a direct relationship between base station traffic load and power consumption. According to this relationship, we develop a linear power consumption model for base stations of both technologies. This paper also gives an overview of the most important concepts which are being proposed to make cellular networks more energy-efficient.

  17. Measurements and Modelling of Base Station Power Consumption under Real Traffic Loads

    Directory of Open Access Journals (Sweden)

    Goran Petrovic

    2012-03-01

    Full Text Available Base stations represent the main contributor to the energy consumption of a mobile cellular network. Since traffic load in mobile networks significantly varies during a working or weekend day, it is important to quantify the influence of these variations on the base station power consumption. Therefore, this paper investigates changes in the instantaneous power consumption of GSM (Global System for Mobile Communications and UMTS (Universal Mobile Telecommunications System base stations according to their respective traffic load. The real data in terms of the power consumption and traffic load have been obtained from continuous measurements performed on a fully operated base station site. Measurements show the existence of a direct relationship between base station traffic load and power consumption. According to this relationship, we develop a linear power consumption model for base stations of both technologies. This paper also gives an overview of the most important concepts which are being proposed to make cellular networks more energy-efficient.

  18. Obrigheim nuclear power station. Annual report 1987

    International Nuclear Information System (INIS)

    Koerner, C.

    1988-01-01

    The Obrigheim nuclear power station was operated at full load during the year 1987; 7.351 operating hours procuded electrical energy of 2.607 GWh. This is the fifth best annual result during Obrigheim's operating period. Since commissioning in October 1968, 139.310 hours of operation have generated 46.681 GWh (gross) and from test operation in March 1969 until the end of 1987, 138.530 hours of operation have generated 46.569 GWh. This is an availability of power of 81.6% in this period and a time availability of 83.9%. In 1987, the plant was shut down for 1.222 hours for the 18th refueling including testing, inspection and repair work. Apart from refueling, the plant had a good time availability and therefore contributed 5% to the safe, economical and environmentally acceptable electricity supply of the Land Baden-Wuerttemberg. The power station is of great significance to the region, both in terms of power supply and the economy. (orig./HP) [de

  19. Burning issue of energy problem after Fukushima disaster of TEPCO's atomic power stations

    International Nuclear Information System (INIS)

    Harada, Shoji

    2012-01-01

    Strikes of unanticipated enormous earthquake and subsequent tsunami brought unbelievable disaster in eastern Japan on March 11, 2012. In particular, collapse of cooling system of TEPCO's Fukushima atomic power stations resulted in IAEA-defined level7 accident including heavy radiation, hydrogen explosion -induced collapse of the building of power station No.2 and No.4 and melt through of nuclear pressure vessel No1.3.4 At an initial stage of the disaster, nobody knew precisely what happened at the power stations. According to the recent report of the national investigation committee, precise reason of the collapse of the cooling system whether it was induced by the strike of huge earthquake or tsunami is still unclear. Due to poor risk management of the government and TEPCO and closure of the precise disaster information, people became suspicious and nervous about the atomic power station. Fifty four atomic power stations have been constructed for these forty years in Japan. On last May 04, all the atomic power stations were shut down due to periodic inspection. However, restart of them became hot discussion. Although atomic power station was regarded as a powerful tool to reduce carbon dioxide several years ago, this situation after March 11 completely changed. In many countries which possess atomic power station, making a road map to develop recyclable energy is a burning issue. It should be noted that German spent about thirty years to declare atomic energy free society. Finally necessity of succession of technology of utilizing atomic power is emphasized. Politics on depending atomic power differs in each country. Therefore, study from Fukushima disaster should be widely used to prevent from unexpected accident of atomic power station.

  20. Nuclear Power Plants (Rev.)

    Energy Technology Data Exchange (ETDEWEB)

    Lyerly, Ray L.; Mitchell III, Walter [Southern Nuclear Engineering, Inc.

    1973-01-01

    Projected energy requirements for the future suggest that we must employ atomic energy to generate electric power or face depletion of our fossil-fuel resources—coal, oil, and gas. In short, both conservation and economic considerations will require us to use nuclear energy to generate the electricity that supports our civilization. Until we reach the time when nuclear power plants are as common as fossil-fueled or hydroelectric plants, many people will wonder how the nuclear plants work, how much they cost, where they are located, and what kinds of reactors they use. The purpose of this booklet is to answer these questions. In doing so, it will consider only central station plants, which are those that provide electric power for established utility systems.

  1. Methodology for maintenance analysis based on hydroelectric power stations reliability; Metodologia para realizar analisis de mantenimiento basado en confiabilidad en centrales hidroelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Rea Soto, Rogelio; Calixto Rodriguez, Roberto; Sandoval Valenzuela, Salvador; Velasco Flores, Rocio; Garcia Lizarraga, Maria del Carmen [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2012-07-01

    A methodology to carry out Reliability Centered Maintenance (RCM) studies for hydroelectric power plants is presented. The methodology is an implantation/extension of the guidelines proposed by the Engineering Society for Advanced Mobility Land, Sea and Space in the SAE-JA1012 standard. With the purpose of answering the first five questions, that are set out in that standard, the use of standard ISO14224 is strongly recommended. This approach standardizes failure mechanisms and homogenizes RCM studies with the process of collecting failure and maintenance data. The use of risk matrixes to rank the importance of each failure based on a risk criteria is also proposed. [Spanish] Se presenta una metodologia para realizar estudios de mantenimiento Basado en Confiabilidad (RCM) aplicados a la industria hidroelectrica. La metodologia es una implantacion/ extension realizada por los autores de este trabajo, de los lineamientos propuestos por la Engineering Society for Advanced Mobility Land, Sea and Space en el estandar SAE-JA1012. Para contestar las primeras cinco preguntas del estandar se propone tomar como base los modos y mecanismos de fallas de componentes documentados en la guia para recopilar datos de falla en el estandar ISO-14224. Este enfoque permite estandarizar la descripcion de mecanismos de fallas de los equipos, tanto en el estudio RCM como en el proceso de recopilacion de datos de falla y de mantenimiento, lo que permite retroalimentar el ciclo de mejora continua de los procesos RCM. Tambien se propone el uso de matrices de riesgo para jerarquizar la importancia de los mecanismos de falla con base en el nivel de riesgo.

  2. Merchant funding for power stations

    International Nuclear Information System (INIS)

    Johnston, B.; Bartlam, M.

    1997-01-01

    The next frontier for project finance is merchant generation: the financing of IPPs without long-term offtake contracts. Banks are just beginning to finance merchant generation power stations. One of the first was Destec's Indian Queens project in Cornwall, UK. Bruce Johnston and Martin Bartlam of Wilde Sapte discuss the project. (UK)

  3. Nuclear power stations. Information paper no. 1. Controls on the building and running of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-01

    Controls and constraints which govern the development and running of nuclear power stations are briefly examined. Government policy, permission to build, authority to start building, site acquisition building, running and public opinion are briefly discussed.

  4. The influence of climate-warming on the power production of Swiss hydroelectric power stations

    International Nuclear Information System (INIS)

    Schaeppi, A.

    2006-01-01

    This article summarises an interview with Michael Piot of the Swiss Federal Office of Energy (SFOE) on a study commissioned by the office that takes a look at the influence of a possible climate warming on water flow in the Swiss alpine area. In particular, the influence of such possible changes on the Swiss power generation industry are looked at. Prognoses for climate change are reviewed, as are the results of a study made by the SFOE on energy perspectives for the period up to the year 2035. Possible changes in the alpine climate are discussed and their influence on the water household of the region is examined. Possible further and more drastic changes in the period up to 2099 are briefly commented on

  5. Safety principles and design criteria for nuclear power stations

    International Nuclear Information System (INIS)

    Gazit, M.

    1982-01-01

    The criteria and safety principles for the design of nuclear power stations are presented from the viewpoint of a nuclear engineer. The design, construction and operation of nuclear power stations should be carried out according to these criteria and safety principles to ensure, to a reasonable degree, that the likelihood of release of radioactivity as a result of component failure or human error should be minimized. (author)

  6. The effects of new diversion valves in Alta hydro-power station on the population of Atlantic salmon

    International Nuclear Information System (INIS)

    Forseth, Torbjoern; Naesje, Tor F.; Jensen, Arne J.; Saksgaard, Laila; Hvidsten, Nils Arne

    1997-02-01

    The report deals with consequential relations for the environment of Alta river in Northern Norway in connection with a hydroelectric power plant. The consequences of regulating the flow by the installation of an new diversion valve are discussed. 39 refs., 10 figs., 4 tabs

  7. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  8. Environmental study of the Wairakei Power Plant. [Effects of hydroelectric power plant on ecology of Waikato River Basin, New Zealand

    Energy Technology Data Exchange (ETDEWEB)

    Axtmann, R C

    1974-12-01

    Physical, chemical, biological, ecological, and aesthetic aspects of the Wairakei Power Plant are examined, in varying detail, but with primary emphasis on the chemical and thermal effluents. When flows are average or higher in the Waikato River, the Plant's environmental effects are not overly severe. However, operating requirements for the Waikato Hydro-electric System are such that the Plant sporadically produces wastes that may affect the human and natural environment adversely. These adverse effects are not presently too serious, but suggestions are made for improving the Plant's overall environmental performance. Although the point is not discussed in detail, it is clear from the results of the study that any additional thermal plants on the Waikato could strain the river's absorptive capacities severely, unless alternative disposal techniques are used for the various effluents.

  9. Standard concerning the design of nuclear power stations in earthquake-prone districts

    International Nuclear Information System (INIS)

    Kirillov, A.P.; Anbriashivili, Y.K.; Suvilova, A.V.

    1980-01-01

    The measures of security assurance against the effect of radioactive contamination has become more and more complex due to the construction of nuclear power stations of diverse types. The aseismatic measures for the nuclear power stations built in the districts where earthquakes of different intensity occur are important problems. All main machinery and equipments and emergency systems in power stations must be protected from earthquakes, and this makes the solution of problems difficult. At present in USSR, the provisional standard concerning the design of atomic energy facilities built in earthquake-prone districts is completed. The basic philosophy of the standard is to decide the general requirements as the conditions for the design of nuclear power stations built in earthquake-prone districts. The lowest earthquake activity in the construction districts is considered as magnitude 4, and in the districts where earthquake activity is magnitude 9 or more, the construction of nuclear power stations is prohibited. Two levels of earthquake action are specified for the design: design earthquake and the largest design earthquake. The construction sites of nuclear power stations must be 15 to 150 km distant from the potential sources of earthquakes. Nuclear power stations are regarded as the aseismatically guaranteed type when the safety of reactors is secured under the application of the standard. The buildings and installations are classified into three classes regarding the aseismatic properties. (Kako, I.)

  10. Vacuum switchgear for power station auxiliary switchboards

    International Nuclear Information System (INIS)

    Coombs, P.E.

    1992-01-01

    Sizewell B is the first UK power station in which vacuum switchgear is used for the auxiliary switchboards. Previously the 3.3kV, 6.6kV or 11kV switchgear has used air-break circuit breakers and fused air-break contactors, known as motor starting devices or fused switching devices (FSD). The use of vacuum interrupters is therefore a new technology in this application, although it has been established in the UK distribution network and in industrial installations from the mid 1970s. Vacuum switchgear was already in use in the USA for power station auxiliary switchgear at the time that it was proposed for Sizewell B. The Sizewell B high voltage auxiliary switchgear comprises eight Unit and Station Auxiliary Switchboards at 3.3kV and 11kV, and four 3.3kV Essential Switchboards for the essential safety related circuits, making a total of 65 circuit breakers plus FSD panels. (Author)

  11. Optimization and Feasibility Analysis of Satellite Earth Station Power System Using Homer

    Directory of Open Access Journals (Sweden)

    Hassen T. Dorrah

    2012-06-01

    Full Text Available Satellite earth stations which located in remote areas are one of many applications powered by the renewable energy sources. Ground system consists of ground station and control centers working together to support the spacecraft and the data user. Earth station consists of major subsystems, transmitter, receiver, antenna, tracking equipment, terrestrial interface equipment and power supply. Power subsystem is an important part that required for supplying the earth station with electrical power to continue communicating with its remote sensing satellite. This paper deals with simulation and optimal sizing of earth station power system using HOMER software. A combination of two energy sources (solar, and wind to provide a continuous electric power production is used to determine the optimum system operation. Three system configurations are compared with respect to the total net present cost (NPC and levelized cost of energy (COE. Also, economical study will be analyzed for energy demand and sensitivity analysis will be performed.

  12. Annual report of operation management in nuclear power stations, fiscal year 1985

    International Nuclear Information System (INIS)

    1986-09-01

    Twenty years have elapsed since the first practical nuclear reactor in Japan started the operation. In the generated power in fiscal year 1985, that of nuclear power stations for the first time overtook that of thermal power stations, and now the age of nuclear power as the main and oil power as the subordinate has begun. As of the end of fiscal year 1985, there were 32 nuclear power plants in operation, having total output capacity of 24.521 million kW. In fiscal year 1985, nuclear power plants generated about 159 billion kWh, which is about 26 % of electric power supply. As to the capacity factor, 76 % was attained in fiscal year 1985, and this is ranked in the top group of LWR-operating countries in the world. It showed that the Japanese technology of nuclear power generation is at the top level in the world. However, in order to increase nuclear power generation and to accomplish the role of main electric power source hereafter, it is necessary to further increase the reliability and economical efficiency. The list of nuclear power stations in Japan, the state of operation of nuclear power stations, the state of accidents and troubles, the state of regular inspection, the management of radioactive wastes and the radiation exposure of workers in nuclear power stations, the operational management and others are reported. (Kako, I.)

  13. On the troubles happened in nuclear power stations, 1995

    International Nuclear Information System (INIS)

    1996-01-01

    The troubles which happened at the nuclear power stations of Japan in the fiscal year of 1995 are described in this report. The number of troubles in those power stations reported from the corporations of electric industry to Nuclear Safety Commission according to The Law for Regulation of Nuclear Fertile Material, Nuclear Fuel Material and Reactors and Utility Industry Law were 14 in the year and so, the number per reactor was 0.3. The details of the trouble cases were as follows; one and nine cases for automatic and manual shutdowns in operation, respectively and 4 cases found during a down-time of the reactor. But, there was no influence on the environment surrounding those nuclear power stations by the radioactive materials in either of the cases. (M.N.)

  14. The process of granting of the authorization-registration of small-scale hydroelectric power plant; O processo de outorga de autorizacao-registro de PCHs

    Energy Technology Data Exchange (ETDEWEB)

    Lago, Rosangela; Nobrega, Andre Pepitone da [Agencia Nacional de Energia Eletrica (ANEEL), Brasilia, DF (Brazil). Superintendencia de Concessoes e Autorizacoes de Geracao

    2002-07-15

    Small hydroelectric power plant represent a fast and efficient way of promoting the expansion of electricity supply in order to meet the growing demand in the market place. Due to its characteristics, this type of enterprises operated enables better meet the needs of potential in small urban centers and rural regions, since, in most cases, complements the provision made by the interconnected system.

  15. thermal power stations' reliability evaluation in a hydrothermal system

    African Journals Online (AJOL)

    Dr Obe

    A quantitative tool for the evaluation of thermal power stations reliability in a hydrothermal system is presented. ... (solar power); wind (wind power) and the rest, thermal power and ... probability of a system performing its function adequately for ...

  16. Reviewing nuclear power station achievement

    International Nuclear Information System (INIS)

    Howles, L.R.

    1976-01-01

    For measurement of nuclear power station achievement against original purchase the usual gross output figures are of little value since the term loosely covers many different definitions. An authentically designed output figure has been established which relates to net design output plus house load at full load. Based on these figures both cumulative and moving annual load factors are measured, the latter measuring the achievement over the last year, thus showing trends with time. Calculations have been carried out for all nuclear stations in the Western World with 150 MW(e) gross design output and above. From these are shown: moving annual load factor indicating relative station achievements for all the plants; cumulative load factors from which return of investment can be calculated; average moving annual load factors for the four types of system Magnox, PWR, HWR, and BWR; and a relative comparison of achievement by country in a few cases. (U.K.)

  17. Hydroelectric power plant operation procedures: more than a necessity, a competitive advantage; Procedimentos de operacao de usinas hidreletricas: mais que uma necessidade uma vantagem competitiva

    Energy Technology Data Exchange (ETDEWEB)

    Winck, Joao Carlos Candal; Marques, Jorge Luiz Giulian; Lovatto, Hedio Bitencourt; Lindau, Joao Carlos [Companhia Estadual de Energia Eletrica do Estado do Rio Grande do Sul, Porto Alegre, RS (Brazil)]. E-mails: jwinck@ceee.com.br; jorgem@ceee.com.br; hediol@ceee.com.br; joaol@ceee.com.br

    2000-07-01

    This paper report the reasons, the advantages, the phases, the methodology and the difficulties faced by the CEEE (Electric Energy Company of the State of Rio Grande do Sul - Brazil), when elaborating the 125 operation procedures, referred to the 13 from 15 hydroelectric power plants, during a 30 months work period.

  18. ANALYSIS OF SOLAR POWER STATION SCHEMES ON PHOTOELECTRIC MODULES FOR ELECTRIC CARS CHARGING STATIONS

    Directory of Open Access Journals (Sweden)

    A. Hnatov

    2017-12-01

    Full Text Available The analysis of existing schemes for building solar power stations on photoelectric modules with the revealing of their operation principles and functionality has been conducted. The specified technical characteristics of each of the analyzed schemes are given. The structural scheme of the solar charging station for electric cars with determining its functional capabilities and operation features is proposed. The practical application of this scheme will help to reduce the dependence on the general electric power supply network and will create conditions for its total rejection.

  19. 47 CFR 74.710 - Digital low power TV and TV translator station protection.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.710 Digital low power TV and TV translator station protection. (a) An application to construct a new low power TV, TV translator, or TV...

  20. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  1. Reducing nitrogen oxides from power stations

    International Nuclear Information System (INIS)

    Scheller, W.

    1986-12-01

    The report contains 17 individual lectures of the seminar included in databanks. The lectures concern combustion and waste gas measures for reducing the sulfur dioxide and nitrogen oxide emission from coal-fired and gas-fired power stations. (PW) [de

  2. Hinkley Point 'C' power station public inquiry: statement of case

    International Nuclear Information System (INIS)

    1988-08-01

    This Statement of Case contains full particulars of the case which the Central Electricity Generating Board (CEGB) proposes to put forward at the Hinkley Point ''C'' Inquiry. It relates to the planning application made by the CEGB for the construction of a 1200 MW Pressurized Water Reactor (PWR) power station at Hinkley Point in the United Kingdom, adjacent to an existing nuclear power station. The inquiry will consider economic, safety, environmental and planning matters relevant to the application and the implications for agriculture and local amenities of re-aligning two power transmission lines. The Statement contains submissions on the following matters: Topic 1 The Requirement for the Station; Topic 2 Safety and Design, including Radioactive Discharges; Topic 3 The On-Site Management of Radioactive Waste and Decommissioning of the Station; Topic 4 Emergency Arrangements; Topic 5 Local and Environmental Issues. (author)

  3. Operating experience at Scottish Nuclear's power stations

    International Nuclear Information System (INIS)

    Blackburn, P.

    1991-01-01

    A brief history is presented of the design and operation of the four Scottish nuclear power stations currently run by Scottish Nuclear, namely Hunterston 'A' and 'B' and the Torness reactors. A design flaw in the Magnox reactor at Hunterston 'A' led to it being operated at lower than optimal temperature and hence producing less power. For Hunterston 'B' reactor the Advanced Gas Cooled design prototype was used. Operating setbacks and successes are noted. The design chosen for Torness embraced all the good points of Hunterston 'B' but sought to eliminate its faults. After 26 years of successful operation Hunterston 'A' is now being decommissioned, while the other three stations continue to generate electricity successfully. (UK)

  4. Public relations activities of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kono, T.

    1998-01-01

    This article includes information of the Service Hall for Kashiwazaki-Kariwa Nuclear Power Station. About 30% of the total electricity production in Japan is due to 16 power stations and 52 reactors. The service hall is a kind of atomic power pavilion for public relations. In Japan, each nuclear power station has such a pavilion, which acts a a center of public relations activities for the atomic power. (S. Grainger)

  5. Total life cycle cost model for electric power stations

    International Nuclear Information System (INIS)

    Cardullo, M.W.

    1995-01-01

    The Total Life Cycle Cost (TLCC) model for electric power stations was developed to provide a technology screening model. The TLCC analysis involves normalizing cost estimates with respect to performance standards and financial assumptions and preparing a profile of all costs over the service life of the power station. These costs when levelized present a value in terms of a utility electricity rate. Comparison of cost and the pricing of the electricity for a utility shows if a valid project exists. Cost components include both internal and external costs. Internal costs are direct costs associated with the purchase, and operation of the power station and include initial capital costs, operating and maintenance costs. External costs result from societal and/or environmental impacts that are external to the marketplace and can include air quality impacts due to emissions, infrastructure costs, and other impacts. The cost stream is summed (current dollars) or discounted (constant dollars) to some base year to yield a overall TLCC of each power station technology on a common basis. While minimizing life cycle cost is an important consideration, it may not always be a preferred method for some utilities who may prefer minimizing capital costs. Such consideration does not always result in technology penetration in a marketplace such as the utility sector. Under various regulatory climates, the utility is likely to heavily weigh initial capital costs while giving limited consideration to other costs such as societal costs. Policy makers considering external costs, such as those resulting from environmental impacts, may reach significantly different conclusions about which technologies are most advantageous to society. The TLCC analysis model for power stations was developed to facilitate consideration of all perspectives

  6. Increased wheeze but not bronchial hyperreactivity near power stations.

    Science.gov (United States)

    Halliday, J A; Henry, R L; Hankin, R G; Hensley, M J

    1993-08-01

    In a previous study a higher than expected prevalence of asthma was found in Lake Munmorah, a coastal town near two power stations, compared with another coastal control town. This study aimed to compare atopy, bronchial hyperreactivity, and reported symptoms of asthma in the power station town and a second control area with greater socioeconomic similarity. A cross sectional survey was undertaken. Lake Munmorah, a coastal town near two power stations, and Dungog, a country town in the Hunter Valley, NSW, Australia. All children attending kindergarten to year 6 at all schools in the two towns were invited to participate in 1990. The response rates for the questionnaire for reported symptoms and associated demographic data were 92% in Lake Munmorah and 93% in Dungog, with 84% and 90% of children respectively being measured for lung function, atopy, and bronchial reactivity. There were 419 boys and 432 girls aged 5 to 12 years. Main outcome measures were current wheeze and bronchial hyper-reactivity, defined as a fall in forced expiratory volume in 1 second (FEV1) or peak expiratory flow (PEF) of 20% or more. Current wheeze was reported in 24.8% of the Lake Munmorah children compared with 14.6% of the Dungog children. Bronchial hyper-reactivity was similar for both groups--25.2% in Lake Munmorah and 22.3% in Dungog. The mean baseline FEV1 was lower in Lake Munmorah than in Dungog (p power station town, but bronchial hyper-reactivity and skin test defined atopy were similar in the two communities. These results are consistent with the previous study and confirm the increased presence of reported symptomatic illness in the town near power stations.

  7. Modelling and controlling hydropower plants

    CERN Document Server

    Munoz-Hernandez, German Ardul; Jones, Dewi Ieuan

    2013-01-01

    Hydroelectric power stations are a major source of electricity around the world; understanding their dynamics is crucial to achieving good performance.  Modelling and Controlling Hydropower Plants discusses practical and well-documented cases of modelling and controlling hydropower station modelling and control, focussing on a pumped storage scheme based in Dinorwig, North Wales.  Single-input-single-output and multiple-input-multiple-output models, which cover the linear and nonlinear characteristics of pump-storage hydroelectric power stations, are reviewed. The most important dynamic features are discussed, and the verification of these models by hardware in the loop simulation is described. To show how the performance of a pump-storage hydroelectric power station can be improved, classical and modern controllers are applied to simulated models of the Dinorwig power plant. These include PID, fuzzy approximation, feed-forward and model-based predictive control with linear and hybrid prediction models. Mod...

  8. Application of the minicomputer at Genkai Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Kitamura, H [Kyushu Electric Power Co., Inc., Fukuoka (Japan)

    1977-03-01

    Genkai Nuclear Power Station introduced a minicomputer system for the data control purpose in addition to a process control computer introduced in the same manner as other PWR nuclear power stations. This system employs two computers; the one for on-line data aquisition, and another for data processing. The control system introduced includes four systems amoung various data control businesses in the nuclear power station. The language used is mainly an assembler language. The first is the meteorological control system which collects, edits and transmits the weather data sent from the observation instruments around the power station. The second is the personal radiation exposure control system which is designed to realize the labor-saving in book-keeping, the speed-up and the improvement of accuracy in the preparation of the reports to the authorities and the head office and the data for exposure control, and the unification of data processing. The third is the waste control system composed of three subsystems of gas, liquid and solid waste control. The fourth is the maintenance and repair control system which gives inputs to the computer according to the classification written in the slips for maintenance and repair, and prepares a number of statistical tables for maintenance control.

  9. Impact studies and nuclear power stations

    International Nuclear Information System (INIS)

    Chambolle, Thierry

    1981-01-01

    Impact studies form an essential part of environmental protection. The impact study discipline has enabled the EDF to have a better understanding of the effects of nuclear power stations on the environment and to remedy them at the project design stage [fr

  10. Ten years of KRB Gundremmingen demonstration power station

    International Nuclear Information System (INIS)

    Facius, H. von; Ettemeyer, R.

    1976-01-01

    In August 1976 the first large nuclear power station in the Federal Republic, the KRB Gundremmingen plant with a net power of 237 MWe, has been in operation ten years. The construction of KRB as a demonstration plant was a major step forward on the way to the economic utilization of nuclear power for German utilities. Design and operation of the plant have decisively influenced the further development of the technology of light water reactors in the Federal Republic. Unlike the Kahl Experimental Nuclear Power Station (VAK), which was a test facility designed to generate experience and to train personnel, the decision to build KRB from the outset was conditional upon the fulfillment of economic criteria. Here are some of the aspects in which KRB has greatly influenced the development of nuclear power station technology: first application of internal steam-water separation instead of a steam drum with a water content of the steam of less than 1%; construction of a reactor buildung with all the necessary safety factors; solution of the corrosion and erosion problems linked with the use of a saturated steam turbine; special measures taken to prevent the turbine from speeding up due to post-evaporation effects after shutdown. Detailed comments are devoted to the subjects of availability, causes of failure and repair work. (orig.) [de

  11. Reload Startup Physics Tests for Tianwan Nuclear Power station

    International Nuclear Information System (INIS)

    Yang Xiaoqiang; Li Wenshuang; Li Youyi; Yao Jinguo; Li Zaipeng Jiangsu

    2010-01-01

    This paper briefly describes the test purposes, test items, test schedules and test equipment's for reload startup physics test's on Unit 1 and 2 of Tianwan Nuclear Power station. Then, an overview of the previous thrice tests and evaluations on the tests results are presented. In the end, the paper shows the development and work direction of optimization project for reload startup physics tests on Unit 1 and 2 of Tianwan Nuclear Power station. (Authors)

  12. Technical and economical studies on the modernization of small-scale hydroelectric power plants: difficulties and proposals; Estudo tecnico-economicos de mordernizacao de PCH`s: Dificuldades e propostas

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Antonio Tadeu Lyrio de; Beltrame, Eduardo; Santos, Afonso Henriques Moreira; Souza, Zulcy [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1989-12-31

    This work describes and analyses some technical alternatives to be used in re-designing or reforming small-scale hydroelectric power plants. In addition, some criteria are also presented in order to proceed a comparative evaluation based on economic feasibility 7 refs. 5 figs. 1 tab.

  13. Technical and economical studies on the modernization of small-scale hydroelectric power plants: difficulties and proposals; Estudo tecnico-economicos de mordernizacao de PCH`s: Dificuldades e propostas

    Energy Technology Data Exchange (ETDEWEB)

    Almeida, Antonio Tadeu Lyrio de; Beltrame, Eduardo; Santos, Afonso Henriques Moreira; Souza, Zulcy [Escola Federal de Engenharia de Itajuba, MG (Brazil)

    1990-12-31

    This work describes and analyses some technical alternatives to be used in re-designing or reforming small-scale hydroelectric power plants. In addition, some criteria are also presented in order to proceed a comparative evaluation based on economic feasibility 7 refs. 5 figs. 1 tab.

  14. Safety planning for nuclear power stations

    International Nuclear Information System (INIS)

    Tadmor, J.

    1979-01-01

    The article shows that compared to the many industries and other human activities, nuclear power stations are among the safest. A short description of the measures taken to prevent accidents and of the additional safety means entering into action if an accident does occur is presented. It is shown that in nuclear plants the death frequency following malfunctioning is 1 death in 100.000 years whereas deaths following other human activities is 1 in 2 to 100 years and following natural calamities like earthquakes and floods is 1 in 10 years. As an example it is shown that for a population of 15.000.000 living in a radius of 40 km around 100 power stations the average number of deaths will be of 2 per year as compared to 4200 from road accidents with the corresponding number of injuries of 20 and 375.000 respectively. (B.G.)

  15. Proceedings of scientific-technical seminar: materials investigation for power stations and power grid

    International Nuclear Information System (INIS)

    1994-05-01

    This report is an assembly of the papers concerning the material problems occurring during the exploitation of power stations as well as power grid. The diagnostic methods are also discussed. (author)

  16. Canadian Environmental Assessment Act : A comprehensive study report on the Peribonka hydroelectric power project

    International Nuclear Information System (INIS)

    2004-01-01

    This report presents the results of an environmental assessment of Hydro-Quebec's proposed project to build a new facility on the Peribonka River. The facility includes a run-of-river generating station with an installed capacity of 385 MW. The Quebec Region of the Department of Fisheries and Oceans Canada has conducted an environmental assessment of the project's effects. A summary of the project and the environment in which it will be carried out was presented along with the results of public consultations conducted by Hydro-Quebec. A summary of the main environmental effects was included along with cumulative effects and the effects caused by accidents or malfunctions that may occur. In addition, the terms and conditions of mitigation measures and follow-up programs were described and the significance of any environmental impacts were assessed. The project includes the construction of a 80 metre high dam, two dikes and one spillway upstream of the mouth of the Manouane River. The level of the reservoir would remain at close to its maximum level of 244.2 metres to optimize hydroelectric production. The power house would be integrated into the Hydro-Quebec transmission network. The main impacts of the project would result from the construction of the reservoir, the encroachment caused by associated facilities and the changes in hydrological conditions. This report outlined the current use of lands and resources for traditional purposes by Aboriginals. It also discussed the effects of natural events such as flooding, waves and climate that may cause damage to the facilities. It was determined that the project is not likely to cause significant effects on the renewable resources of the forest and the fisheries. The Department of Fisheries and Oceans, after having taking into account proposed mitigation measures, has rendered a preliminary conclusion which states that the project is not likely to have significant negative environmental effects. 29 refs., 7 tabs., 2

  17. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements; Vispassage waterkrachtcentrale Linne. Didson metingen

    Energy Technology Data Exchange (ETDEWEB)

    Van Keeken, O.A.; Griffioen, A.B. [Institute for Marine Resources and Ecosystem Studies IMARES, Wageningen UR, IJmuiden (Netherlands)

    2011-11-15

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [Dutch] Bij de waterkrachtcentrale in de Maas bij Linne is een visafweer- en geleidingssysteem aangelegd. In deze studie werd op twee avonden verdeeld over de maanden augustus en september 2011 gekeken in hoeverre vissen het visgeleidingssysteem benaderden en gebruikten. Voor het vaststellen van het zwemgedrag van de vissen is gebruik gemaakt van de DIDSON, een hoge resolutie sonar waarmee bewegende beelden kunnen worden gemaakt van vis in troebel water om het gedrag te bestuderen.

  18. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  19. Planning and preparedness for radiological emergencies at nuclear power stations

    International Nuclear Information System (INIS)

    Thomson, R.; Muzzarelli, J.

    1996-01-01

    The Radiological Emergency Preparedness (REP) Program was created after the March 1979 accident at the Three Mile Island nuclear power station. The Federal Emergency Management Agency (FEMA) assists state and local governments in reviewing and evaluating state and local REP plans and preparedness for accidents at nuclear power plants, in partnership with the US Nuclear Regulatory Commission (NRC), which evaluates safety and emergency preparedness at the power stations themselves. Argonne National Laboratory provides support and technical assistance to FEMA in evaluating nuclear power plant emergency response exercises, radiological emergency plans, and preparedness

  20. Axial power deviation control strategy and computer simulation for Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Liao Yehong; Zhou Xiaoling, Xiao Min

    2004-01-01

    Daya Bay Nuclear Power Station has very tight operation diagram especially at its right side. Therefore the successful control of axial power deviation for PWR is crucial to nuclear safety. After analyzing various core characters' effect on axial power distribution, several axial power deviation control strategies has been proposed to comply with different power varying operation scenario. Application and computer simulation of the strategies has shown that our prediction of axial power deviation evolution are comparable to the measurement values, and that our control strategies are effective. Engineering experience shows that the application of our methodology can predict accurately the transient of axial power deviation, and therefore has become a useful tool for reactor operation and safety control. This paper presents the axial power control characteristics, reactor operation strategy research, computer simulation, and comparison to measurement results in Daya Bay Nuclear Power Station. (author)

  1. Hydroelectric dams in Amazon as source of GHG

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-01-01

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH 4 and CO 2 emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO 2 emissions from the above water biomass, the authors' focus will be restricted to the formulae for calculating the cumulative effect of CO 2

  2. Shippingport Atomic Power Station decommissioning program and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Crimi, F P; Skavdahl, R E

    1985-01-01

    The Shippingport Station decommissioning project is the first decommissioning of a large scale nuclear power plant, and also the first nuclear power plant to be decommissioned which has continued the power operation as long as 25 years. The nuclear facilities which have been decommissioned so far have operated for shorter period and were small as compared with commercial power reactors, but the experience gained by those decommissionings as well as that gained by nuclear plant maintenance and modification has helped to establish the technology and cost basis for Shippingport and future decommissioning projects. In this paper, the current status of the preparation being made by the General Electric Co., its subcontractor and the US Department of Energy for starting the decommissioning phase of the Shippingport Atomic Power Station is described. Also remote metal cutting, decontamination, concrete removal, the volume reduction of liquids and solids and robotics which will be applied to the project are discussed. The Shippingport Station is a 72 MWe PWR plant having started operation in 1957, and permanently shut down in 1982, after having generated over 7.4 billion kWh of electricity.

  3. Natural radionuclides near a coal-fired power station

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Briggs, J L

    1984-06-15

    An experiment was carried out to measure the specific activity of Pb-210 and Po-210 in livers from cattle that had grazed in a field near Didcot coal-fired power station. Livers from cattle in the Cotswold region were measured for comparison. The specific activities of Pb-210 and Po-210 in soil and grass samples from both areas were also measured at 3-monthly intervals over a year. No statistically significant increases were observed in the Pb-210 and Po-210 levels in liver, soil or grass samples which could be attributed to the operation of the power station.

  4. Dynamics and control in nuclear power stations

    International Nuclear Information System (INIS)

    Butterfield, M.H.

    1992-01-01

    This volume presents a wide view of aspects of control of nuclear power stations by taking into consideration the plant as a whole and the protection systems employed therein. Authors with worldwide experience consider all aspects of dynamics and control in the context of both fast and thermal power stations. The topics discussed include the methods of development and applications within the analysis of plant behaviour, the validation of mathematical models, plant testing, and the design and implementation of controls. There are 27 papers all of which are indexed separately; steady states and model evolution (5 papers), control and protection systems (5 papers), transients (7 papers), testing and data (3 papers), model validation (6 papers) and commissioning and operation (1 paper). (author)

  5. Algological studies on the site of the Fessenheim nuclear power station

    International Nuclear Information System (INIS)

    Pierre, J.F.

    1980-01-01

    Systematic study of the algal flora at five stations situated on both sides of the nuclear power station at Fessenheim (department of Haut-Rhin, France). The analysis of the diatomaceae populations in 1977 and 1978, i.e. before and after the start of the reactors, does not indicate, in the composition and abundance of algae, any modifications susceptible to be directly connected to the implantation of the nuclear power station [fr

  6. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  7. 47 CFR 73.6019 - Digital Class A TV station protection of low power TV, TV translator, digital low power TV and...

    Science.gov (United States)

    2010-10-01

    ... power TV, TV translator, digital low power TV and digital TV translator stations. 73.6019 Section 73... low power TV, TV translator, digital low power TV and digital TV translator stations. An application... A TV station will not be accepted if it fails to protect authorized low power TV, TV translator...

  8. Controversial power station

    International Nuclear Information System (INIS)

    Marcan, P.

    2008-01-01

    When information on plans to build a power station in Trebisov first appeared reactions differed. A 40-billion investment in a town with more than 20% unemployment seemed attractive. But some people did not like the idea of having a power plant located in the town. Around one year after the investment was officially announced TREND returned to Trebisov. In the meantime the investor has managed to overcome one of the biggest obstacles on its way to building a new power plant. The ministry responsible gave the environmental study a positive rating. But objectors are still not sure that everything is fine. They claim that the study misinterprets data and that the ministry did not show expertise when evaluating it. 'Is it possible that a coal power plant located in a town would have twice as many positive effects on peoples' health than negative ones? Why don't we build them everywhere?'asked the chairman of the civic society, Trebisov nahlas, Gejza Gore. The developer of the project, Ceskoslovenska energeticka spolocnost (CES), Kosice is fighting back and claims that their counterpart lacks professional arguments. In the meantime it is preparing for area management proceedings. Trebisov is also involved in the discussion and claims that the town planning scheme does not include such a project. The Ministry of Construction has a different opinion. In the opinion of the Ministry the town planning scheme allows a 885-megawatt power plant to be built only a few hundred meters away from housing estates. (author)

  9. Managing a drought: what does a hydroelectric utility do when the rain stops?

    Energy Technology Data Exchange (ETDEWEB)

    Cormie, D.

    2004-07-01

    Measures put in place by Manitoba Hydro to combat drought resulting from the absence of precipitation, are discussed. Under normal conditions Manitoba Hydro, a provincially owned electric utility, generates over 95 per cent of its electricity from hydroelectric power stations. During the extended drought lasting from the summer of 2002 until the spring of 2004, the utility found itself forced to import electricity from outside the province. The principal reason that the utility was able to survive this long spell of no precipitation is that Manitoba Hydro's planners always assume that a drought will continue and if an option to purchase power exists, the utility will pursue that option instead of depleting its reservoirs. In most situations, Manitoba Hydro is able to import purchased power using its 12 transmission line interconnections to utilities in Saskatchewan, Ontario and the United States. The combined capacity of these lines is approximately, 1,340 MW. Manitoba Hydro also has a limited gas-fired generating capacity, which has been put into service during the drought, in particular to cap the price of purchased electricity when spot market prices exceeded the cost of producing electricity with natural gas. The third line of defence rests with a coal-fired unit at the utility's Brandon generating station which may be used as a last resort to help the utility limit its financial vulnerability to high electricity and gas prices. In addition to supplying power to to Manitobans, the utility has long-term contractual obligations to supply approximately 4,000 GWh of power to export customers. During the 2003-2004 drought Manitoba Hydro pursued offsetting purchases to these long-term sales; essentially buying back the power it had previously agreed to sell. Although retained earnings allowed the utility to cushion ratepayers from the financial shock of the drought, to rebuild those earnings, it will be necessary to increase electricity rates across all

  10. The nuclear power generation

    International Nuclear Information System (INIS)

    Serres, R.

    1999-01-01

    The French nuclear generating industry is highly competitive. The installations have an average age of fifteen years and are half way through their expected life. Nuclear power accounts for 70% of the profits of the French generating company, EDF. Nuclear generation has a minimal effect on the atmosphere and France has a level of CO 2 emissions, thought to be the main cause of the greenhouse effect, half that of Europe as a whole. The air in France is purer than in neighbouring countries, mainly because 75% of all electrical power is generated in nuclear plants and 15% in hydroelectric stations. The operations and maintenance of French nuclear power plants in the service and distribution companies out of a total of 100 000 employees in all, 90 % of whom are based in mainland France. (authors)

  11. The stakes of the hydroelectric power in the integrated management of the Basins. Which place for the EPTB; Les enjeux de l'hydroelectricite dans la gestion integree des bassins versants. Quelle place pour les EPTB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    In the framework of a sustainable development, the EPTB (Public, Territorial Institutions of Basins) need an evolution of the regulations concerning the management of the hydroelectric power (areas of the Adour, Dordogne, Garonne and Lot). This document presents in two parts the context and the stakes of the hydroelectric concession: the concessions specifications and the analysis of the main articles, the tariffs, taxes and the environment constraints. (A.L.B.)

  12. Mission Analysis for LEO Microwave Power-Beaming Station in Orbital Launch of Microwave Lightcraft

    Science.gov (United States)

    Myrabo, L. N.; Dickenson, T.

    2005-01-01

    A detailed mission analysis study has been performed for a 1 km diameter, rechargeable satellite solar power station (SPS) designed to boost 20m diameter, 2400 kg Micr,oWave Lightcraft (MWLC) into low earth orbit (LEO) Positioned in a 476 km daily-repeating oi.bit, the 35 GHz microwave power station is configured like a spinning, thin-film bicycle wheel covered by 30% efficient sola cells on one side and billions of solid state microwave transmitter elements on the other, At the rim of this wheel are two superconducting magnets that can stor,e 2000 G.J of energy from the 320 MW, solar array over a period of several orbits. In preparation for launch, the entire station rotates to coarsely point at the Lightcraft, and then phases up using fine-pointing information sent from a beacon on-board the Lightcraft. Upon demand, the station transmits a 10 gigawatt microwave beam to lift the MWLC from the earth surface into LEO in a flight of several minutes duration. The mission analysis study was comprised of two parts: a) Power station assessment; and b) Analysis of MWLC dynamics during the ascent to orbit including the power-beaming relationships. The power station portion addressed eight critical issues: 1) Drag force vs. station orbital altitude; 2) Solar pressure force on the station; 3) Station orbital lifetime; 4) Feasibility of geo-magnetic re-boost; 5) Beta angle (i..e., sola1 alignment) and power station effective area relationship; 6) Power station percent time in sun vs, mission elapsed time; 7) Station beta angle vs.. charge time; 8) Stresses in station structures.. The launch dynamics portion examined four issues: 1) Ascent mission/trajecto1y profile; 2) MWLC/power-station mission geometry; 3) MWLC thrust angle vs. time; 4) Power station pitch rate during power beaming. Results indicate that approximately 0 58 N of drag force acts upon the station when rotated edge-on to project the minimum frontal area of 5000 sq m. An ion engine or perhaps an electrodynamic

  13. STUDY OF INFLUENCE OF WIND-POWER STATIONS ON BIRDS: ANALYSIS OF INTERNATIONAL PRACTICES

    Directory of Open Access Journals (Sweden)

    Gorlov P. I.

    2012-06-01

    Full Text Available The world experience of bird collisions with wind-power stations was analyzed. The detailcharacteristics of principal threats to the birds during building and exploitation of wind-power stations was done. Comparative analysis of factors caused annual birds mortality was performed. Some proposals of negative influence minimization were suggested for wind-power stations utilization.

  14. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930

    Directory of Open Access Journals (Sweden)

    Débora Marques de Almeida Nogueira Mortati

    2011-06-01

    Full Text Available The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The electricity generation in Brazil follows the paths of the railroad; and it was drawing newborders between rural and urban, rural and industry. The cities aspect was changing as the “improvements” were availability, many powered by electricity. The nascent industries were also occupying the space between the railroad and energy; what created new districts and centralities. Thispaper analyzes the processes that hydroelectric energy sets off in São Paulo state; and focuses on itsconsequences.

  15. Reload shutdown for Nuclear Power Stations in spain in 2003

    International Nuclear Information System (INIS)

    2004-01-01

    Regarding time reductions in fuel reloading at Spanish nuclear power stations, the Spanish Nuclear Security Council (CSN), at the request of the Spanish Finance and Treasury Department of the Chamber of Deputies, delivered an instruction, by which power station's owners were urged to establish a detailed planning of reload operations. This article includes the results of this instruction. (Author) 6 refs

  16. Construction and environmental aspects of hydroelectric power stations; Bauliche Gestaltung und Umweltaspekte von Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Giesecke, J. [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    1997-12-31

    In terms of environmental-friendliness, inexhaustibility, availability, non-pollution and cost conditions, hydro power is the most obvious renewable energy source. Harnessing of hydro power does interfere with nature. But there are ways of reconciling economic and ecological concerns. (orig.) [Deutsch] Im Hinblick auf Umweltfreundlichkeit, Unerschoepflichkeit, Verfuegbarkeit, Schadstofffreiheit und Kostenlage stellt die Wasserkraft die vorrangige erneuerbare Energiequelle dar. Ihre Nutzung fuehrt zu Eingriffen in die Natur. Es gibt jedoch Wege, die Belange der Oekonomie und der Oekologie ausgewogen aufeinander abzustimmen. (orig.)

  17. The main safety problems encountered at Creys-Malville power station

    International Nuclear Information System (INIS)

    Saitcevsky, Boris

    1980-01-01

    The 1200 MW. Creys-Malville nuclear power station, situated on the upper Rhone river, in the Isere department, is the largest unit in construction of the fast neutrons sodium-cooled reactor channel. Realized within a European framework, this power station of a specific character, requires special safety dispositions, owing to the utilization of sodium. Safety rests on a thorough preventive system, particularly at the level of the sodium circuits, the shut-down system and the devices for the evacuation of residual power [fr

  18. Incinerators for radioactive wastes in Japanese nuclear power stations

    International Nuclear Information System (INIS)

    Karita, Yoichi

    1983-01-01

    As the measures of treatment and disposal of radioactive wastes in nuclear power stations, the development of the techniques to decrease wastes, to reduce the volume of wastes, to treat wastes by solidification and to dispose wastes has been advanced energetically. In particular, efforts have been exerted on the volume reduction treatment from the viewpoint of the improvement of storage efficiency and the reduction of transport and disposal costs. Incineration as one of the volume reduction techniques has been regarded as the most effective method with large reduction ratio, but it was not included in waste treatment system. NGK Insulators Ltd. developed NGK type miscellaneous solid incinerators, and seven incinerators were installed in nuclear power stations. These incinerators have been operated smoothly, and the construction is in progress in six more plants. The necessity of incinerators in nuclear power stations and the problems in their adoption, the circumstance of the development of NGK type miscellaneous solid incinerators, the outline of the incinerator of Karlsruhe nuclear power station and the problems, the contents of the technical development in NGK, the outline of NGK type incinerators and the features, the outline of the pretreatment system, incinerator system, exhaust gas treatment system, ash taking out system and accessory equipment, the operational results and the performance are described. (Kako, I.)

  19. IMPLEMENTATION OF ENERGY LAW OF HYBRID POWER STATION FOR SOCIAL WELFARE

    Directory of Open Access Journals (Sweden)

    Dyah Ayu Widowati

    2014-11-01

    Full Text Available This study was aimed to investigate the Implementation of Energy Law of Hybrid Power Station for Social Welfare in Pantai Baru. The problem formulations are the management and utilization of hybrid power station in Pantai Baru and implementation of energy law of hybrid power station for social welfare in the fields of economy and information in Pantai Baru. Based on data analysis it is concluded that the management of hybrid power station in Pantai Baru is performed collaboratively between government and the society. The existence of hybrid power station in pantai baru has positive impacts in economy and information. Penelitian ini meneliti Pelaksanaan Hukum Energi Pembangkit Listrik Tenaga Hibrid untuk Kesejahteraan Rakyat di Bidang Ekonomi dan Informasi di Pantai Baru. Masalah yang diteliti adalah bentuk pengelolaan dan pemanfaatan pembangkit listrik tenaga hibrid di Pantai Baru dan pelaksanaan hukum energi pembangkit listrik tenaga hibrid untuk kesejahteraan rakyat di bidang ekonomi dan informasi di Pantai Baru. Berdasarkan analisis data dapat disimpulkan bahwa pengelolaan pembangkit listrik tenaga hibrid yang ada di pantai baru dilakukan secara kolaboratif, antara pemerintah dengan masyarakat. Kehadiran pembangkit listrik tenaga hibrid yang ada di pantai baru telah memberikan dampak positif di bidang ekonomi dan informasi.

  20. Scheduled Operation of PV Power Station Considering Solar Radiation Forecast Error

    Science.gov (United States)

    Takayama, Satoshi; Hara, Ryoichi; Kita, Hiroyuki; Ito, Takamitsu; Ueda, Yoshinobu; Saito, Yutaka; Takitani, Katsuyuki; Yamaguchi, Koji

    Massive penetration of photovoltaic generation (PV) power stations may cause some serious impacts on a power system operation due to their volatile and unpredictable output. Growth of uncertainty may require larger operating reserve capacity and regulating capacity. Therefore, in order to utilize a PV power station as an alternative for an existing power plant, improvement in controllability and adjustability of station output become very important factor. Purpose of this paper is to develop the scheduled operation technique using a battery system (NAS battery) and the meteorological forecast. The performance of scheduled operation strongly depends on the accuracy of solar radiation forecast. However, the solar radiation forecast contains error. This paper proposes scheduling method and rescheduling method considering the trend of forecast error. More specifically, the forecast error scenario is modeled by means of the clustering analysis of the past actual forecast error. Validity and effectiveness of the proposed method is ascertained through computational simulations using the actual PV generation data monitored at the Wakkanai PV power station and solar radiation forecast data provided by the Japan Weather Association.

  1. Safety aspects of station blackout at nuclear power plants

    International Nuclear Information System (INIS)

    1985-03-01

    The principal focus of this report is on existing light water reactor nuclear power plants. However, many of the considerations discussed herein can be equally applied to new plants, i.e. those not yet in construction. This report is organized to provide a description of design and procedural factors which safety assessments and reviews of operating experience have shown to be important. These are divided into the off-site power system, the on-site AC power systems and alternate (or nearby) sources of power. The latter may be used in the unlikely event that both normal off-site and on-site sources fail. It must be emphasized that first priority should be placed on designing and maintaining high reliability of both the off-site and on-site AC power systems. This basic concept also applies to the capabilities for restoring power sources which failed and making use of all available alternative and nearby power sources during an emergency, to restore AC power in a prompt manner. Discussions on these aspects are provided in chapters 2 and 3 of this report. Because the expected event frequency and associated confidence in such estimations of station blackout are uncertain, preparations should be made to deal with a station blackout. The nature of those preparations, whether they be optimizing emergency procedures to use existing equipment, modifying this equipment to enhance capabilities, or adding new components or systems to cope with station blackout, must be made in light of plant-specific assessments and regulatory safety philosophies/requirements. Discussions on these matters are provided in chapter 4. General and specific conclusions and recommendations are provided in chapter 5. Appendix A provides a description of several case studies on station blackout and loss of off-site power. Abstracts of papers and presentations are provided in Appendix B with authors and affiliations identified to facilitate personal contact. The References and Bibliography contain a

  2. Experiences of operation for Ikata Nuclear Power Station

    International Nuclear Information System (INIS)

    Kashimoto, Shigeyuki

    1979-01-01

    No. 1 plant in the Ikata Nuclear Power Station, Shikoku Electric Power Co., Inc., is a two-loop PWR unit with electric output of 566 MW, and it began the commercial operation on September 30, 1977, as the first nuclear power station in Shikoku. It is the 13th LWR and 7th PWR in Japan. The period of construction was 52 months since it had been started in June, 1973. During the period, it became the object of the first administrative litigation to seek the cancellation of permission to install the reactor, and it was subjected to the influence of the violent economical variation due to the oil shock, but it was completed as scheduled. After the start of operation, it continued the satisfactory operation, and generated about 2.35 billion KWh for 4300 operation hours. It achieved the rate of utilization of 96.7%. Since March 28, 1978, the first periodical inspection was carried out, and abnormality was not found in the reactor, the steam generator and the fuel at all. The period of inspection was 79 days and shorter than expected. The commercial operation was started again on June 14. The outline of the Ikata Nuclear Power Station, its state of operation, and the periodical inspection are reported. Very good results were able to be reported on the operation for one year, thanks to the valuable experiences offered by other electric power companies. (Kako, I.)

  3. Design of a photovoltaic central power station: flat-plate array

    Energy Technology Data Exchange (ETDEWEB)

    1984-02-01

    A design for a photovoltaic central power station using fixed flat-panel arrays has been developed. The 100 MW plant is assumed to be located adjacent to the Saguaro Power Station of Arizona Public Service. The design assumes high-efficiency photovoltaic modules using dendritic web cells. The modules are arranged in 5 MW subfields, each with its own power conditioning unit. The photovoltaic output is connected to the existing 115 kV utility switchyard. The site specific design allows detailed cost estimates for engineering, site preparation, and installation. Collector and power conditioning costs have been treated parametrically.

  4. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Science.gov (United States)

    Che Munaaim, M. A.; Razali, N.; Ayob, A.; Hamidin, N.; Othuman Mydin, M. A.

    2018-03-01

    A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion) energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP). This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW) and fall beyond of the range of a micro hydro power (5kW - 100kW) since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy) especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing water to make

  5. Potential of Micro Hydroelectric Generator Embedded at 30,000 PE Effluent Discharge of Sewerage Treatment Plant

    Directory of Open Access Journals (Sweden)

    Che Munaaim M.A.

    2018-01-01

    Full Text Available A micro hydroelectric generator is an energy conversion approach to generate electricity from potential (motion energy to an electrical energy. In this research, it is desired to be implemented by using a micro hydroelectric generator which is desired to be embedded at the continuous flow of effluent discharge point of domestic sewerage treatment plant (STP. This research evaluates the potential of electricity generation from micro hydroelectric generator attached to 30,000 PE sewerage treatment plant. The power output obtained from calculation of electrical power conversion is used to identify the possibility of this system and its ability to provide electrical energy, which can minimize the cost of electric bill especially for the pumping system. The overview of this system on the practical application with the consideration of payback period is summarized. The ultimate aim of the whole application is to have a self-ecosystem electrical power generated for the internal use of STP by using its own flowing water in supporting the sustainable engineering towards renewable energy and energy efficient approach. The results shows that the output power obtained is lower than expected output power (12 kW and fall beyond of the range of a micro hydro power (5kW - 100kW since it is only generating 1.58 kW energy by calculation. It is also observed that the estimated payback period is longer which i.e 7 years to recoup the return of investment. A range of head from 4.5 m and above for the case where the flow shall at least have maintained at 0.05 m3/s in the selected plant in order to achieved a feasible power output. In conclusion, wastewater treatment process involves the flowing water (potential energy especially at the effluent discharge point of STP is possibly harvested for electricity generation by embedding the micro hydroelectric generator. However, the selection of STP needs to have minimum 4.5 meter head with 0.05 m3/s of continuously flowing

  6. The local economic and social effects of power station siting: anticipated, demonstrated and perceived

    International Nuclear Information System (INIS)

    Glasson, J.

    1980-01-01

    The paper discusses the economic and social effects of power station siting at a local level using material based on the interim research findings from a project commissioned by the Central Electricity Generating Board. The cases for and against power station development are outlined and a review of the actual economic and social effects is presented, drawn from a study of a conventional power station at Drax and a nuclear power station at Sizewell. (U.K.)

  7. Research on comprehensive decision-making of PV power station connecting system

    Science.gov (United States)

    Zhou, Erxiong; Xin, Chaoshan; Ma, Botao; Cheng, Kai

    2018-04-01

    In allusion to the incomplete indexes system and not making decision on the subjectivity and objectivity of PV power station connecting system, based on the combination of improved Analytic Hierarchy Process (AHP), Criteria Importance Through Intercriteria Correlation (CRITIC) as well as grey correlation degree analysis (GCDA) is comprehensively proposed to select the appropriate system connecting scheme of PV power station. Firstly, indexes of PV power station connecting system are divided the recursion order hierarchy and calculated subjective weight by the improved AHP. Then, CRITIC is adopted to determine the objective weight of each index through the comparison intensity and conflict between indexes. The last the improved GCDA is applied to screen the optimal scheme, so as to, from the subjective and objective angle, select the connecting system. Comprehensive decision of Xinjiang PV power station is conducted and reasonable analysis results are attained. The research results might provide scientific basis for investment decision.

  8. 47 CFR 74.792 - Digital low power TV and TV translator station protected contour.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 4 2010-10-01 2010-10-01 false Digital low power TV and TV translator station... SERVICES Low Power TV, TV Translator, and TV Booster Stations § 74.792 Digital low power TV and TV translator station protected contour. (a) A digital low power TV or TV translator will be protected from...

  9. Discharges to the environment and environmental protection at CEGB power stations

    International Nuclear Information System (INIS)

    Wright, J.K.

    1981-01-01

    The subject is discussed under the headings: introduction (scope of paper will cover the principles, methods and results obtained in environmental protection in relation to atmospheric discharges made routinely during power generation); air pollution control; nuclear power stations (type of discharge, annual discharges, environmental monitoring); fossil fuelled power stations; health effects; trace elements; long range transport and acid rain; future coal fired plant; carbon dioxide. (U.K.)

  10. Nuclear power and national energy security

    International Nuclear Information System (INIS)

    Addae, A.K.

    2001-01-01

    The demand for energy in Ghana is expected to grow rapidly in the next couple of decades if the objectives of the Vision 2020 Programme are to become a reality. In particular, the demand for electric power is expected to increase 3 to 5 fold over 1997 levels by the year 2020.This calls for early planning. Adequate and dependable central station electric power supplies in the next couple of decades is therefore very critical to sustainable development and the achievement of the objective of the Vision 2020 Programme. Curtailment in electric power supplies cause disruption in economic activities and consequent economic losses. The recent cases in point are the 1983/84 and 1997/1998 power curtailments in Ghana due to low water levels in the Akosombo Reservoir. These led not only to substantial disruptions in economic activities but also to the erosion of invest confidence in the economy. It is, therefore, very essential that the country's central station electric power supply system should not continue to depend on hydro-electric power as in the past years but should be based on a mix of energy sources to provide an acceptable level of national energy security under all circumstances

  11. Valves and fittings for nuclear power stations

    International Nuclear Information System (INIS)

    1976-01-01

    The standard specifies technical requirements for valves and pipe fittings in nuclear power stations with PWR type reactors. Details of appropriate materials, welding, surface treatment for corrosion protection, painting, and complementary supply are given

  12. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  13. Mission: Partnerships - A Socially Responsible Approach for New Hydro-electric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Wojczynski, Ed; Cole, Victoria; Pachal, Shawna; Goulet, Richard

    2010-09-15

    Worldwide there is a desire for clean, secure and renewable energy developed in an environmentally and socially responsible manner. In the Canadian province of Manitoba, where water is an abundant resource, efforts are being undertaken by Manitoba Hydro to achieve this goal through the development of new hydro-electric generating stations in partnership with Aboriginal (indigenous) communities. This paper focuses on the lessons learned by Manitoba Hydro in developing and implementing partnership agreements with northern Aboriginal communities on two new generation projects - the Wuskwatim Generation Project and the Keeyask Generation Project.

  14. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  15. Dosimetry systems in nuclear power stations

    International Nuclear Information System (INIS)

    Weidmann, U.

    1992-01-01

    In the following paper the necessity of the use of electronic dosimetry systems in nuclear power stations is presented, also encompassing the tasks which this type of systems has to fulfill. Based on examples the construction principles and the application possibilities of a PC supported system are described. 5 figs

  16. The stakes of the hydroelectric power in the integrated management of the Basins. Which place for the EPTB; Les enjeux de l'hydroelectricite dans la gestion integree des bassins versants. Quelle place pour les EPTB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    In the framework of a sustainable development, the EPTB (Public, Territorial Institutions of Basins) need an evolution of the regulations concerning the management of the hydroelectric power (areas of the Adour, Dordogne, Garonne and Lot). This document presents in two parts the context and the stakes of the hydroelectric concession: the concessions specifications and the analysis of the main articles, the tariffs, taxes and the environment constraints. (A.L.B.)

  17. Economic and financial benefits as a compensation for living near a nuclear power station. A case study of Kashiwazaki-Kariwa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kato, Takaaki; Hatta, Masahisa; Matsumoto, Shiro; Nishikawa, Masashi

    2007-01-01

    Although dwellers living near a nuclear power station are entitled to economic/financial benefits such as increased job opportunities and local tax revenues pertaining to the power station, it is not clear whether such benefits are appreciated by the dwellers. Two findings of this study based upon a social survey of local dwellers living near the Kashiwazaki-Kariwa Nuclear Power Station are summarized as follows. First, an increase in the per capita sizes of the local tax revenue and national subsidies resulted in a larger share of respondents who thought that those revenues are beneficial. Therefore, local dwellers are aware of the sizes of economic/financial benefits. Second, given the same risk level of nuclear disaster, a larger per capita financial benefit resulted in a larger share of respondents who felt compensated for the nuclear risk. However, this increase in the number of compensated respondents is low relative to the increase in the amount of financial benefits. (author)

  18. Occupational radiation exposures at Canadian CANDU nuclear power stations

    International Nuclear Information System (INIS)

    LeSurf, J.E.; Taylor, G.F.

    1982-09-01

    In Canada, methods to reduce the radiation exposure to workers at nuclear power reactors have been studied and implemented since the early days of the CANDU reactor program. Close collaboration between the designers, the operators, and the manufacturers has reduced the total exposure at each station, the dose requirement to operate and maintain each successive station compared with earlier stations, and the average annual exposure per worker. Specific methods developed to achieve dose reduction include water chemistry; corrosion resistant materials; low cobalt materials; decontamination; hot filtration, improved equipment reliability, maintainability, and accessibility; improved shielding design and location; planning of work for low exposure; improved operating and maintenance procedures; removal of tritium from D 2 O systems and work environments; improved protective clothing; on-power refuelling; worker awareness and training; and many other small improvements. The 1981 occupational dose productivity factors for Pickering A and Bruce A nuclear generating stations were respectively 0.43 and 0.2 rem/MW(e).a

  19. DC-DC power converter research for Orbiter/Station power exchange

    Science.gov (United States)

    Ehsani, M.

    1993-01-01

    This project was to produce innovative DC-DC power converter concepts which are appropriate for the power exchange between the Orbiter and the Space Station Freedom (SSF). The new converters must interface three regulated power buses on SSF, which are at different voltages, with three fuel cell power buses on the Orbiter which can be at different voltages and should be tracked independently. Power exchange is to be bi-directional between the SSF and the Orbiter. The new converters must satisfy the above operational requirements with better weight, volume, efficiency, and reliability than is available from the present conventional technology. Two families of zero current DC-DC converters were developed and successfully adapted to this application. Most of the converters developed are new and are presented.

  20. Techno-economic assessments of oxy-fuel technology for South African coal-fired power stations

    CSIR Research Space (South Africa)

    Oboirien, BO

    2014-03-01

    Full Text Available at the technical and economic viability of oxy-fuel technology for CO(sub2) capture for South African coal-fired power stations. This study presents a techno-economic analysis for six coal fired power stations in South Africa. Each of these power stations has a...

  1. Heating of water by nuclear power stations

    International Nuclear Information System (INIS)

    1974-01-01

    The aim of this note is to examine: the thermal conditions of the Rhone in its present state; heating caused by the building of nuclear power stations; the main hydrobiological and ecological characteristics of the Rhone [fr

  2. The emergence of small hydroelectric plants and the urbanization process in the hinterland of São Paulo state (1890-1930)

    OpenAIRE

    Mortati, Débora Marques de Almeida Nogueira; Argollo Ferrão, André Munhoz de

    2011-01-01

    The period focused in this paper is from 1890 to 1930, when São Paulo state began its industrialization process, the coffee economy was booming and, in that context, it was founded the first hydroelectric power company in the state. This panorama advanced till 1930, when the coffee economy began in crisis, the industry was already established and the construction of hydroelectric plants after 1930 takes on another course: the large dams, closing the cycle of small hydroelectric plants. The el...

  3. Hydrogen-based industry from remote excess hydroelectricity

    International Nuclear Information System (INIS)

    Ouellette, N.; Rogner, H.-H.; Scott, D.S.

    1997-01-01

    This paper examines synergies, opportunities and barriers associated with hydrogen and excess hydro-electricity in remote areas. The work is based on a case study that examined the techno-economic feasibility of a new hydrogen-based industry using surplus/off-peak generating capacity of the Taltson Dam and Generating Station in the Northwest Territories, Canada. After evaluating the amount and cost of hydrogen that could be produced from the excess capacity, the study investigates three hydrogen utilization scenarios: (1) merchant liquid or compressed hydrogen, (2) hydrogen as a chemical feedstock for the production of hydrogen peroxide, (3) methanol production from biomass, oxygen and hydrogen. Hydrogen peroxide production is the most promising and attractive strategy in the Fort Smith context. The study also illustrates patterns that recur in isolated sites throughout the world. (Author)

  4. Loss of cooling accident simulation of nuclear power station spent-fuel pool

    Energy Technology Data Exchange (ETDEWEB)

    Lee, M.; Liang, K-S., E-mail: mlee@ess.nthu.edu.tw, E-mail: ksliang_1@hotmail.com [National Tsing Hua Univ., Hsinchu, Taiwan (China); Lin, K-Y., E-mail: syrup760914@gmail.com [Taiwan Power Company, Taiwan (China)

    2014-07-01

    The core melt down accident of Fukushima Nuclear Power Station on March 11th, 2011 alerted nuclear industry that the long term loss of cooling of spent fuel pool may need some attention. The target plant analyzed is the Chinshan Nuclear Power Station of Taiwan Power Company. The 3-Dimensional RELAP5 input deck of the spent fuel pool of the station is built. The results indicate that spent fuel of Chinshan Nuclear Power Station is uncovered at 6.75 days after an accident of loss cooling takes place and cladding temperature rises above 2,200{sup o}F around 8 days. The time is about 13 hours earlier than the results predicted using simple energy balance method. The results also show that the impact of Counter Current Flow Limitation (CCFL) and radiation heat transfer model is marginal. (author)

  5. Community reaction to noise from power stations

    International Nuclear Information System (INIS)

    Job, R.F.S.; Hede, A.J.

    1989-01-01

    Community reaction is a major consideration in noise control. The relationship between noise exposure and community reaction has received considerable attention in relation to railway, traffic, aircraft and impulsive noise. The results have shown a number of features in common, including: similarly shaped noise/reaction functions; similar results across different measurement techniques and cultures, noise/reaction correlations based on individual respondent data are low (mean r = 0.42 ± 0.12: Job, 1988), although correlations of .58 and above have been reported correlations based on data grouped by noise exposure are generally high and relatively unaffected by the type of noise studied whereas correlations based on individual data tend to be lower for impulsive noise than for transportation noise attitude to the noise source and sensitivity to noise shows strong correlations with reaction. This paper reports that the present study was undertaken in order toe establish over a wider range of noise exposure whether community reaction to power station noise is similar to reaction to other types of non-impulsive noise. It is possible that reaction is different given important differences in the source of the noise which may affect attitude. Attitudes towards power stations may be more positive than attitudes to aircraft or rail noise for example, because almost all respondents use electricity regularly every day. Further, the power stations in the present study provided employment for the relatively small surrounding communities

  6. Observations of Earth space by self-powered stations in Antarctica.

    Science.gov (United States)

    Mende, S B; Rachelson, W; Sterling, R; Frey, H U; Harris, S E; McBride, S; Rosenberg, T J; Detrick, D; Doolittle, J L; Engebretson, M; Inan, U; Labelle, J W; Lanzerotti, L J; Weatherwax, A T

    2009-12-01

    Coupling of the solar wind to the Earth magnetosphere/ionosphere is primarily through the high latitude regions, and there are distinct advantages in making remote sensing observations of these regions with a network of ground-based observatories over other techniques. The Antarctic continent is ideally situated for such a network, especially for optical studies, because the larger offset between geographic and geomagnetic poles in the south enables optical observations at a larger range of magnetic latitudes during the winter darkness. The greatest challenge for such ground-based observations is the generation of power and heat for a sizable ground station that can accommodate an optical imaging instrument. Under the sponsorship of the National Science Foundation, we have developed suitable automatic observing platforms, the Automatic Geophysical Observatories (AGOs) for a network of six autonomous stations on the Antarctic plateau. Each station housed a suite of science instruments including a dual wavelength intensified all-sky camera that records the auroral activity, an imaging riometer, fluxgate and search-coil magnetometers, and ELF/VLF and LM/MF/HF receivers. Originally these stations were powered by propane fuelled thermoelectric generators with the fuel delivered to the site each Antarctic summer. A by-product of this power generation was a large amount of useful heat, which was applied to maintain the operating temperature of the electronics in the stations. Although a reasonable degree of reliability was achieved with these stations, the high cost of the fuel air lift and some remaining technical issues necessitated the development of a different type of power unit. In the second phase of the project we have developed a power generation system using renewable energy that can operate automatically in the Antarctic winter. The most reliable power system consists of a type of wind turbine using a simple permanent magnet rotor and a new type of power

  7. Annual report on operational management of nuclear power stations, 1979-1980

    International Nuclear Information System (INIS)

    1981-04-01

    This report was compiled by the Agency of Natural Resoures and Energy. The commercial nuclear power stations in Japan started the operation in 1966 for the first time, and as of the end of March, 1981, 22 plants with more than 15.5 million kW capacity were in operation. Nuclear power generation is regarded as the top-rated substitute energy for petroleum, and the target of its development in 1990 is about 52 million kW. The government and the people are exerting utmost efforts to attain the target. The result of the rate of operation of nuclear power stations reached 60.8% in 1980, but it is important to maintain the good, stable state of operation by perfecting the operational management hereafter in order to establish the position of LWRs. At present, the operational management officers of the government stay in nationwide power stations, and supervise the state of operations, thus the system of operational management was strengthened after the Three Mile Island accident in the U.S., and the improvement in the rate of operation is expected. A table shows the nuclear power stations in operation and under construction. The state of operations of individual nuclear power plants in 1979 and 1980, the accidents and failures occurred in nuclear power plants from 1966 to 1980, the minor troubles, the conditions in the regular inspections of individual nuclear power plants, radioactive waste management and the radiation exposure of workers are reported. (Kako, I.)

  8. Mathematical modelling of thermal-plume interaction at Waterford Nuclear Power Station

    International Nuclear Information System (INIS)

    Tsai, S.Y.H.

    1981-01-01

    The Waldrop plume model was used to analyze the mixing and interaction of thermal effluents in the Mississippi River resulting from heated-water discharges from the Waterford Nuclear Power Station Unit 3 and from two nearby fossil-fueled power stations. The computer program of the model was modified and expanded to accommodate the multiple intake and discharge boundary conditions at the Waterford site. Numerical results of thermal-plume temperatures for individual and combined operation of the three power stations were obtained for typical low river flow (200,000 cfs) and maximum station operating conditions. The predicted temperature distributions indicated that the surface jet discharge from Waterford Unit 3 would interact with the thermal plumes produced by the two fossil-fueled stations. The results also showed that heat recirculation between the discharge of an upstream fossil-fueled plant and the intake of Waterford Unit 3 is to be expected. However, the resulting combined temperature distributions were found to be well within the thermal standards established by the state of Louisiana

  9. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  10. Costs of producing electricity from nuclear, coal-fired and oil-fired power stations

    International Nuclear Information System (INIS)

    1980-07-01

    The Board publishes generation costs per kW h incurred at recently commissioned power stations so that the costs and performance of nuclear and conventional stations of roughly the same date of construction can be compared. The term 'conventional power station' is used to describe coal-fired and oil-fired steam power stations. The Board has now decided: (A) to supplement the past method of calculating costs at main stations commissioned between 1965 and 1977 by giving the associated figures for interest during construction, for research, and for training; (B) to give similar figures for the contemporary stations Hinkley Point B and the first half of Drax, (C) to provide estimates of generating costs of stations under construction; (D) to set out explicitly the relationship of this method of calculation to that employed in taking investment decisions on future stations. In this way the figures for stations in commission and under construction are arrived at more in line with the general principles of evaluating investment proposals. The present document provides this information. (author)

  11. Utilization of artificial intelligence techniques for the Space Station power system

    Science.gov (United States)

    Evatt, Thomas C.; Gholdston, Edward W.

    1988-01-01

    Due to the complexity of the Space Station Electrical Power System (EPS) as currently envisioned, artificial intelligence/expert system techniques are being investigated to automate operations, maintenance, and diagnostic functions. A study was conducted to investigate this technology as it applies to failure detection, isolation, and reconfiguration (FDIR) and health monitoring of power system components and of the total system. Control system utilization of expert systems for load scheduling and shedding operations was also researched. A discussion of the utilization of artificial intelligence/expert systems for Initial Operating Capability (IOC) for the Space Station effort is presented along with future plans at Rocketdyne for the utilization of this technology for enhanced Space Station power capability.

  12. Development and construction of nuclear power and nuclear heating stations in the USSR

    International Nuclear Information System (INIS)

    Schmidt, G.; Kirmse, B.

    1983-01-01

    The state-of-the-art of nuclear power technology in the USSR is reviewed by presenting characteristic data on design and construction. The review takes into consideration the following types of facilities: Nuclear power stations with 1000 MWe pressurized water reactors, with 1000 MWe pressure tube boiling water reactors, and with 600 MWe fast breeder reactors; nuclear heating power stations with 1000 MWe reactors and nuclear heating stations with 500 MWth boiling water reactors

  13. Using plasma-fuel systems at Eurasian coal-fired thermal power stations

    Science.gov (United States)

    Karpenko, E. I.; Karpenko, Yu. E.; Messerle, V. E.; Ustimenko, A. B.

    2009-06-01

    The development of plasma technology for igniting solid fuels at coal-fired thermal power stations in Russia, Kazakhstan, China, and other Eurasian countries is briefly reviewed. Basic layouts and technical and economic characteristics of plasma-fuel systems installed in different coal-fired boiles are considered together with some results from using these systems at coal-fired thermal power stations.

  14. Natural radionuclides near a coal-fired power station

    International Nuclear Information System (INIS)

    Smith-Briggs, J.L.

    1984-01-01

    A previous assessment of the radiological consequences of the emission of natural radionuclides from coal-fired power stations had indicated that 210 Pb was the main contributor to the maximum individual dose. This dose arose from the consumption of foodstuffs particularly cattle liver contaminated by deposited fly ash. Uncertainty surrounded some of the factors used in the assessment, and a limited environmental monitoring programme was recommended to improve it. An experiment has been performed to measure the specific activities of 210 Pb and 210 Po in livers from cattle that had grazed in a field near Didcot power station. Livers from cattle in the Cotswold region have been measured for comparison. The specific activities of 210 Pb and 210 Po in soil and grass samples from both areas have also been measured at three-monthly intervals over a year. No statistically significant increases were observed in the 210 Pb and 210 Po levels in liver, soil or grass samples which could be attributed to the operation of the power station. Transfer coefficients for 210 Pb from forage to liver were about two orders of magnitude less than that used in the original assessment, and the transfer coefficients for 210 Po about a factor a two less. (orig.)

  15. Anticorrosional protection in nuclear power station objects

    International Nuclear Information System (INIS)

    Czarnocki, A.; Kwiatkowski, A.

    1976-01-01

    The distribution and qualities of chemical protection and demands concerning preparation of the bottom for protecting coats in nuclear power station objects are discussed. The solutions of protections applied abroad and in the objects of ''MARIA'' reactor are presented. (author)

  16. Stade nuclear power station (KKS): four giants on tour

    International Nuclear Information System (INIS)

    Beverungen, M.; Viermann, J.

    2008-01-01

    The Stade nuclear power station was the first nuclear power plant in the Federal Republic of Germany to deliver heat in addition to electricity. Since 1984, district heat was distributed to a saltworks nearby. The power plant, which is situated on the banks of the river Elbe, was commissioned in 1972 after approximately 4 years of construction. Together with the Wuergassen plant, it was among the first commercial nuclear power plants in this country. E.ON Kernkraft holds a 2/3 interest, Vattenfall Europe a 1/3 interest in the nuclear power plant. The Stade nuclear power station was decommissioned on November 14, 2003 for economic reasons which, in part, were also politically motivated. In September 2005, the permit for demolition of the nuclear part was granted. The release from supervision under the Atomic Energy Act is expected for 2014. In the course of demolition, the 4 steam generators of the Stade nuclear power station were removed. These components, which have an aggregate weight of approx. 660 tons, are to be safely re-used in Sweden. In September 2007, the steam generators were loaded on board the Swedish special vessel, MS Sigyn, by means of a floating crane. After shipment to Sweden, heavy-duty trucks carried the components to the processing hall of Studsvik AB for further treatment. After 6 months of treatment, the contaminated inner surfaces of the tube bundles of the steam generators have been decontaminated successfully, among other items. This has increased the volume of material available for recycling and thus decreased the volume of residues. (orig.)

  17. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  18. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  19. Managing nuclear power stations for success

    International Nuclear Information System (INIS)

    Smith, G.

    2006-01-01

    Ontario Power Generation's (OPG) top operational priority is to manage its nuclear assets to ensure they operate as safely, efficiently and cost effectively as possible. In meeting these objectives, the company is focused on continuously improving its nuclear performance and benchmarking that performance against the best in North America. This presentation explores how OPG is improving its nuclear performance and the steps it is taking to sustain performance success going forward. Topics to be discussed include the measures OPG is taking to enhance human performance and station reliability as well as the company's preparations to determine if a business case exists for extending the lives of the Pickering B and eventually the Darlington nuclear stations. (author)

  20. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Arnold, P.J.

    1982-11-01

    The systems benefits of the selection of the Sizewell site for a PWR power station are dealt with. The transmission modifications which would be needed to provide effective connection of this station to the system are considered. (U.K.)

  1. Monitoring of radioactivity in the environs of Finnish nuclear power stations in 1986

    International Nuclear Information System (INIS)

    Ilus, E.; Sjoeblom, K.L.; Aaltonen, H.; Klemola, S.; Arvela, H.

    1987-06-01

    Results of the environmental programmes monitoring radioactivity around the Finnish nuclear power stations in 1986 are reported. After the end of April the fallout nuclides from the Chernobyl accident predominated in all samples taken from the environs of the two power stations Loviisa and Olkiluoto. Radionuclides originating from the Finnish power stations were detected mainly in samples taken from the aquatic environment. The concentrations of the locally discharged nuclides were very low in comparison with the fallout nuclides and their impact on the radiation doses of the population was insignificant. Both nuclear power stations are situated in the main fallout area in Finland. The results of these large monitoring programmes give a good picture of the behaviour of the Chernobyl fallout in the specific areas in Finland

  2. 77 FR 50533 - Dominion Nuclear Connecticut, Inc.; Millstone Power Station, Unit 3

    Science.gov (United States)

    2012-08-21

    ....; Millstone Power Station, Unit 3 AGENCY: Nuclear Regulatory Commission. ACTION: Environmental assessment and... search, select ``ADAMS Public Documents'' and then select ``Begin Web- based ADAMS Search.'' For problems... Optimized ZIRLO\\TM\\ fuel rod cladding in future core reload applications for Millstone Power Station, Unit 3...

  3. Improvement and optimization for in-service inspection of M310 nuclear power station

    International Nuclear Information System (INIS)

    Wang Chen; Sun Haitao; Gao Chen; Deng Dong

    2015-01-01

    In-service inspection (ISI) is an important method to ensure the safety of the mechanical equipment in nuclear power stations. According to the in-service inspection experience feedback from the domestic nuclear power stations, the reasonableness of some provisions in the RSE-M code are discussed and the applications of risk-informed in-service inspection (RI-ISI) are introduced, and the advices for the optimization of the ISI of the domestic M310 nuclear power stations are proposed. (authors)

  4. A survey on the history of developing nuclear power station in Hunan Province

    International Nuclear Information System (INIS)

    Ren Dexi

    1993-01-01

    Sixteen years ago it was suggested that a nuclear power station should be built in Hunan Province, and a special document was reported to the State Council. Up to now, the idea has still been under consideration. The author discusses the development of nuclear power station in Hunan province. It mainly consists of four parts: the history, the necessity the barriers met in the course and the feasible way of developing nuclear power station in Hunan Province

  5. 76 FR 50274 - Terrestrial Environmental Studies for Nuclear Power Stations

    Science.gov (United States)

    2011-08-12

    ... Draft Regulatory Guides in the ``Regulatory Guides'' collection of the NRC's Library at http://www.nrc... Stations AGENCY: Nuclear Regulatory Commission. ACTION: Draft regulatory guide; request for comment... draft regulatory guide (DG), DG-4016, ``Terrestrial Environmental Studies for Nuclear Power Stations...

  6. The accident prevention regulation 'Thermal Power Stations' and its effects in practice

    International Nuclear Information System (INIS)

    Albert, O.

    1983-01-01

    The origin of the accident prevention regulation - ''Thermal Power Stations'' is attributable mainly to two tragic accidents. It has made organizational changes and interventions in the operational process necessary in thermal power stations. Emphasis is laid upon the consistent issue of written permits-to-work on plant components carrying a heating medium and operating under pressure and on written operating licences for the operation of boilers. The paper describes additional ways in which regulation influences the daily practices of the power station operator. Brief references is made to the draft of the revised regulation. (orig./HP) [de

  7. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  8. Intertidal ecology of the sea shore near Tarapur Atomic Power Station

    International Nuclear Information System (INIS)

    Balani, M.C.

    1975-01-01

    Surveys were carried out between March 1969 and August 1970 to study the fauna and flora in the littoral zone of the sea shore near the Tarapur Atomic Power Station. The beach adjacent to the Station is rocky with a number of tidal pools inhabited by a variety of organisms whereas the beach to the south is mostly sandy and barren except for a small rocky stretch. The tidal range is 6 m and over a mile of beach is exposed during low tide. The near shore currents are very strong and have a clear northsouth oscillation with the changing tides. Less Atherina sp. fry were available near the Power Station in March 1970 than during the previous year. Possible reasons for these differences are discussed, including the effect of heated discharges on biota. The need is also emphasized to monitor the biota (Plankton, Nekton and Benthos) systematically for content of fission products released by the Power Station. (auth.)

  9. Etan hydropower project spurs industrial, agricultural growth of region

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    Located in Hongdu commune, Xincheng County, Guangxi Zhuang Autonomous Region, on the middle reaches of the Hongshui River, the Etan hydroelectric power station was begun in 1977 and began to generate power in April 1981. The Etan hydroelectric power station is a run-off type, low waterhead medium-sized power station. It has an installed capacity of 60,000 kW for an average yearly power output of 328 million kWh. The main structure of the power station includes a water diversion canal, a water intake gate, a main machinery building and a switching station. The main machinery building is located on the downstream side of the dam on an overhanging cliff. With a construction area of only 5000 m/sup 2/, work was very difficult due to the restricted work area and transportation problems. By strengthening construction management and promoting technical innovation some 670,000 yuan were saved for the state and construction time was accelerated. This assured the completion of the construction and installation of the main parts of the project according to timetables and design requirements. The successful construction of the Etan hydroelectric power station marks another step in amassing experience in the harnessing of the Hongshui River. The project will have a major impact on the growth of industry and agriculture in Guangxi and on the buildup of the minority regions.

  10. High system-safety level of nuclear power stations

    International Nuclear Information System (INIS)

    Lutz, H.R.

    1976-01-01

    A bluntly worded disquisition contrasting the incidence of death and harm to persons in the chemical industry with the low hazards in nuclear power stations. Quotes conclusions from a U.S. accident study that the risk from 100 large power stations is 100 times smaller than from chlorine manufacture and transport. The enclosure of a reactor in a safety container, the well understood effects of radioactivity on man, and the ease of measuring leakage well below safe limits, are safety features which he considers were not matched in the products and plant of the Seveso factory which suffered disaster. Questions the usefulness of warnings about nuclear dangers when chemical dangers are much greater and road dangers very much greater still. (R.W.S.)

  11. Innovations in PHWR design, integration of nuclear power stations into power systems and role of small size nuclear power plants in a developing country

    International Nuclear Information System (INIS)

    Mehta, S.K.; Kakodkar, A.; Balakrishnan, M.R.; Ray, R.N.; Murthy, L.G.K.; Chamany, B.F.; Kati, S.L.

    1977-01-01

    PHWR concept of thermal reactors has been considered with a view to exploiting the limited resources of natural uranium and keeping in mind the projected nuclear power programme covering fast breeder reactors. Experience in engineering of current PHWR units in India, gradual build up of necessary infrastructure and operational experience with one unit, have helped in building up design and technological capability in the country. The R and D facilities have been so planned that additional data required for the design of bigger reactor units (i.e.500/600 MWe) could be generated with minimal augmentation. Satisfactory operation of a nuclear power station demands certain prerequisites from the connected power system. The grid should have load patterns suitable for base load operation of these stations, should be stiff so far as voltage and frequency fluctuations are concerned and should have high reliability. A typical power grid in this country is characterised by heavy loads during peak hours and very light loads during night. Regional grids are of small size and the few interconnections existing between the regional grids consist of weak tie lines. Amongst all types of the power stations, it is the nuclear system which undergoes maximum strain and economic penalty while operating when connected to such a power system. Consistent with the above, phase installation of small-size power reactor units of about 200 MWe capacity may facilitate setting up of larger unit sizes at a later date. The effect of any possible reduction in the capital cost of a larger unit power station will enable the power station to partially meet the demand of the more productive types of loads. This paper deals with some of the major design changes that are being incorporated in the PHWR type power reactors currently being set up and the research and development back-up required for the purpose. Since the unit sizes of the power reactors presently contemplated are small compared to nuclear

  12. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    McInerny, P.T.

    1982-11-01

    A description is given of the policy and practices that would be adopted in the commissioning, operation and maintenance of the proposed Sizewell B PWR power station. The system of personnel recruitment and training required to staff the station is discussed. (U.K.)

  13. Contamination awareness at the Dresden Nuclear Power Station

    International Nuclear Information System (INIS)

    Pagel, D.J.; Rath, W.C.

    1986-01-01

    Dresden Nuclear Power Station, which is located ∼ 60 miles southwest of Chicago near Morris, Illinois, has been generating electricity since 1960. Owned by Commonwealth Edison, Dresden was the nation's first privately financed nuclear station. On its site are three boiling water reactors (BWRs). Due to the contamination potential inherent with a reactor, a contamination trending program was created at the station. Studies had indicated a rise in contamination events during refueling outages. Further increases were due to specific work projects such as hydrolyzing operations. The investigations suggested that contract personnel also increased the number of events. In 1983, a contamination awareness program was created. The 1984 contamination awareness program was comprised of the following: (1) a statistical review in which trended contamination events were discussed. (2) A demonstration of protective clothing removal by an individual making various mistakes. (3) Scenarios were developed for use in mock work areas. (4) Upper management involvement. Because of the 1984 program, favorable attention has been focused on Dresden from the US Nuclear Regulatory Commission and the Institute of Nuclear Power Operations

  14. Start-up of Hekni Power Station. 3. Investigation of the effects of particles on water chemistry, landlocked salmon and freshwater ecology; Igangkjoering av Hekni Kraftverk. 3. Undersoekelser av partikkeleffekter paa vannkjemi, Byglandsfjordbleke og vassdragsoekologi

    Energy Technology Data Exchange (ETDEWEB)

    Bjerknes, V.; Kvellestad, A.; Berntssen, M.

    1996-06-01

    The new Norwegian hydroelectric power station Hekni Power Station in the river Otra began operation in the autumn of 1995. Out of consideration for the landlocked salmon in the Byglandsfjord, valuable and nationally deserving of preservation as it is, the tunnel was gradually filled with water so as to avoid large amounts of suspended sediments downstream. During start-up, several environmental investigations were made, as discussed in this report: registrations and analyses of the water from Otra, experimental exposure of landlocked salmon, assessment of wild fish and collection of bottom animals from river stretches exposed to suspended sediments and from unexposed control stretches. Exposed salmon show clear evidence of typical gill changes due to acidification while there is no evidence of changes caused by suspended sediment particles. The changes in population densities of wild fish and bottom animals from before start-up to after start-up is primarily related to the altered water discharge. However, the absence of groups of particle sensitive bottom animals after exposure may be due to particle emission from the power station. The chemically unstable particles may have temporarily increased the pH and calcium concentration and reduced the concentration of unstable aluminium in the most affected part of the river system, while the particle level itself may have been too low to cause noticeable effects on fish. The extent to which the bottom ecology may have been damaged is not sufficiently well known. 34 refs., 8 figs., 6 tabs.

  15. Reliability models for Space Station power system

    Science.gov (United States)

    Singh, C.; Patton, A. D.; Kim, Y.; Wagner, H.

    1987-01-01

    This paper presents a methodology for the reliability evaluation of Space Station power system. The two options considered are the photovoltaic system and the solar dynamic system. Reliability models for both of these options are described along with the methodology for calculating the reliability indices.

  16. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  17. Daya Bay Nuclear Power Station equipment reliability management system innovation

    International Nuclear Information System (INIS)

    Gao Ligang; Wang Zongjun

    2006-01-01

    Daya Bay Nuclear Power Station has achieved good performance since its commercial operation in 1994. The equipment reliability management system that features Daya Bay characteristics has been established through constant technology introduction, digestion and innovation. It is also based on the success of operational system, equipment maintenance system and technical support system. The system lays a solid foundation for the long-term safe operation of power station. This article emphasizes on the innovation part of equipment reliability management system in Daya Bay. (authors)

  18. Monitoring of the operation of a nuclear power station with design problems in an importing country: The Almaraz power station

    International Nuclear Information System (INIS)

    Reig, J.

    1984-01-01

    The purpose of this paper is to describe the regulatory activities carried out in Spain as a result of the design problem occurring in the steam generators during operation of Unit I of the Almaraz nuclear power station. First, a brief introduction is given to the operating history and characteristics of Unit I of Almaraz. Particular attention is paid to the specific licences issued subsequent to commercial operation which place limitations on the operation of the station and to the operational incidents of which the Nuclear Safety Council (CSN) has been notified. Next, a description is provided of the safety evaluation carried out by the CSN. Three aspects merit particular attention: methodology, evaluation and conclusions. The methodology applied by an importing country is normally based on that of the country of origin of the design, so that the overall evaluation by the NRC has been considered sufficiently representative of aspects specific to the Almaraz power station. In this regard the importance of international collaboration is clearly seen as a principal instrument for performing the evaluation. In the evaluation a distinction is made between general and specific aspects and between inspection programmes and quality assurance requirements. In addition, the conclusions leading to the requirement of the imposition of additional limitations on the operating licence are stated. Apart from the safety evaluation carried out by the CSN, other regulatory activities have been performed over this two-year period. These activities, which include site inspections, audits of the principal supplier company, other independent calculations and so on, are described. Lastly, the paper refers to the lessons learned from the operation of the above-mentioned unit, which are immediately applicable to other Spanish nuclear power stations. (author)

  19. 76 FR 82201 - General Site Suitability Criteria for Nuclear Power Stations

    Science.gov (United States)

    2011-12-30

    ... guidelines in identifying suitable candidate sites for nuclear power stations. The decision that a station... combination and a cost-benefit analysis comparing it with alternative site-plant combinations, as discussed in...

  20. Toluene stability Space Station Rankine power system

    Science.gov (United States)

    Havens, V. N.; Ragaller, D. R.; Sibert, L.; Miller, D.

    1987-01-01

    A dynamic test loop is designed to evaluate the thermal stability of an organic Rankine cycle working fluid, toluene, for potential application to the Space Station power conversion unit. Samples of the noncondensible gases and the liquid toluene were taken periodically during the 3410 hour test at 750 F peak temperature. The results obtained from the toluene stability loop verify that toluene degradation will not lead to a loss of performance over the 30-year Space Station mission life requirement. The identity of the degradation products and the low rates of formation were as expected from toluene capsule test data.

  1. Dealing with operational power station wastes

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, R B [Central Electricity Generating Board, London (UK). Nuclear Health and Safety Dept.

    1981-08-01

    The disposal of wastes from nuclear power stations is discussed. Liquid and gaseous wastes, from magnox stations, which are of low level activity, are dispersed to the sea or estuaries on coastal sites or for the case of Trawfynyeld, to the nearby lake. Low activity solid wastes are either disposed of on local authority tips or in shallow land burial sites. Intermediate level wastes, consisting mainly of wet materials such as filter sludges and resins from cooling ponds, are at present stored in shielded storage tanks either dry or under water. Only one disposal route for intermediate waste is used by Britain, namely, sea-dumping. Materials for sea dumping have to be encapsulated in a durable material for example, concrete.

  2. Experimental research of variable rotation speed ICE-based electric power station

    Directory of Open Access Journals (Sweden)

    Dar’enkov Andrey

    2017-01-01

    Full Text Available Developing variable rotation speed ICE-based stand-alone electric power stations which can supply distant regions and autonomous objects with electricity are of scientific interest due to the insufficient study. The relevance of developing such electric power stations is determined by their usage is to provide a significant fuel saving as well as increase ICE motor service life. The article describes the electric station of autonomous objects with improved fuel economy. The article describes multivariate characteristic. Multivariate characteristic shows the optimal frequency of rotation of the internal combustion engine. At this rotational speed there is the greatest fuel economy.

  3. Hydroelectric power generation assessment for Russia: Cooperation in a mutual transfer of technology

    Energy Technology Data Exchange (ETDEWEB)

    Rogers, M.F. [Harza Engineering Co., Chicago, IL (United States); Meloy, G.R. [Army Corps of Engineers, Lake Oswego, OR (United States); Semenkov, A.V. [Energopromtechnika Group Ltd., Moscow (Russian Federation)

    1995-12-31

    In September 1993, Russian Federation Prime Minister Chernomyrdin and United States Vice President Gore agreed on a joint study to examine options for Russia`s energy future. The objective of the study would be to develop a long-term, comprehensive program for the Russian power sector. A joint Russian-American program was established by the United States government. This program was charged to assess all aspects of the Russian energy sector, including conservation, thermal energy, nuclear energy, transmission line systems, and hydropower energy. The objective of the hydropower energy assessment aspect of the study was to prepare a time-phased investment plan for the period 1995 to 2000 for expansion of the existing hydroelectric energy production. The Hydropower Assessment Project required a close working relationship between engineers from the United States and the Russian Federation. The Project Team was given unprecedented access to design and economic data of existing and planned hydropower projects in the Russian Federation. This paper presents the methodology of the hydropower generation assessment for Russia, focusing on the partnering of American and Russian engineers, which led to a mutual transfer of technology and a successful project.

  4. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  5. Robust Optimisation for Hydroelectric System Operation under Uncertainty

    OpenAIRE

    Apostolopoulou, D.; De Greve, Z.; McCulloch, M.

    2018-01-01

    In this paper, we propose an optimal dispatch scheme for a cascade hydroelectric power system that maximises the head levels of each dam, and minimises the spillage effects taking into account uncertainty in the net load variations, i.e., the difference between the load and the renewable resources, and inflows to the cascade. By maximising the head levels of each dam the volume of water stored, which is a metric of system resiliency, is maximised. In this regard, the operation of the cascade ...

  6. Exploration and practice on contract management of Daya Bay Nuclear Power Station

    International Nuclear Information System (INIS)

    Wang Yonggang

    2002-01-01

    In the market economy, Daya Bay Nuclear Power Station needs to out source or allow to suppliers among industries, while concentrating its core competitive capability, for safely and stable operation. By evaluating the features of contract management in Daya Bay Nuclear Power Station, set up the organization and process of the supply management

  7. Construction of a nuclear power station in one's locality: attitudes and salience

    NARCIS (Netherlands)

    van der Pligt, J.; Eiser, J.R.; Spears, R.

    1986-01-01

    Examined the attitudes toward the building of a nuclear power station in one's locality by surveying 290 residents (mean age 47.5 yrs) of 3 small rural communities that were listed as possible locations for a new nuclear power station. Results show that a large majority of Ss opposed the building of

  8. Operating experience and performance at Narora Atomic Power Station

    International Nuclear Information System (INIS)

    Mittal, Subhash; Gupta, J.P.

    1998-01-01

    Narora Atomic Power Station consists of two units of 220 MWe capacity each. These are Pressurized Heavy Water Reactors, fuelled by natural uranium, moderated and cooled by heavy water. The Station is owned by Nuclear Power Corporation of India Ltd., which is responsible for design, construction, commissioning, and operation of all nuclear power stations in the country. NAPS was the first opportunity to apply operating experiences in design, keeping in view the evolving safety and seismicity requirements, ease of maintenance, inservice inspection needs, improved construction ability and standardization. Both the units of NAPS are having improved safety standards of current international levels. All the equipment are indigenous with improved quality and reliability. The first unit of the station went critical in March 1989 and synchronized to the grid in July 1989. The second units followed with its criticality in October 1991 and synchronization in January 1992. Considering the initial stabilizing period, the performance of both units of NAPS has progressively improved over the years. The annual capacity factor for NAPS - 1 was 90.01% and for NAPS - 2 was 89.01% for the financial year 1997-1998. This paper presents an analysis of the performance during the last three years and measures taken to improve it. The stated enhanced performance could be achieved by improvement in human performance by training/re-training, scrupulous monitoring and review of equipment/systems, institution of adequate procedure and ensuring their adherence. (authors)

  9. Which hydroelectric potential in your region?

    International Nuclear Information System (INIS)

    2011-01-01

    Illustrated by photos, maps, figures and graphs, this Power Point presentation outlines the important remaining potential of hydroelectricity in France: 10.6 TWh. It indicates how this potential has been assessed and calculated. Even if possibilities exist everywhere (either by building new dams or by exploiting existing weirs), four regions present a higher potential for new works: Rhone-Alpes, Midi-Pyrenees, Auvergne, and Provence-Alpes-Cote d'Azur. Maps indicate the concerned rivers and locations in some regions. Such projects which could boost economic local, regional and national development must be designed while taking planning tools into account (notably the climate-air-energy regional schemes), and rules related to river preservation

  10. Experience in safeguarding nuclear material at the Rheinsberg nuclear power station

    International Nuclear Information System (INIS)

    Winkler, R.

    1976-01-01

    The three years' experience that has been gained in application of the Safeguards Agreement shows that the carrying out of inspections at the nuclear power plant has virtually no effect on operating conditions. In future it will be possible to reduce this effect even further and still maintain the operational reliability of the station. Verification of the transfer of nuclear material and detection of possible violations have proved relatively simple. The labour requirement of each unit at the station for the performance of inspections is not more that thirty man-days. Constructive collaboration between power station staff and inspectors is of great importance in improving the safeguards procedures. (author)

  11. A Renewably Powered Hydrogen Generation and Fueling Station Community Project

    Science.gov (United States)

    Lyons, Valerie J.; Sekura, Linda S.; Prokopius, Paul; Theirl, Susan

    2009-01-01

    The proposed project goal is to encourage the use of renewable energy and clean fuel technologies for transportation and other applications while generating economic development. This can be done by creating an incubator for collaborators, and creating a manufacturing hub for the energy economy of the future by training both white- and blue-collar workers for the new energy economy. Hydrogen electrolyzer fueling stations could be mass-produced, shipped and installed in collaboration with renewable energy power stations, or installed connected to the grid with renewable power added later.

  12. Formation of a local Abramis brama orientalis (BERG) population in the zone of hot effluent from the Konakovo hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Sappo, G B

    1976-01-01

    Bream (Abramis brama orientalis) inhabitating the part of the Ivan'kovo Reservoir directly exposed to effluent from the Konakovo Hydroelectric Power Plant are smaller and become sexually mature sooner than elsewhere in the reservoir. Moreover, they have longer tail peduncles and anal, thoracic, and dorsal fins than other bream. And, in contrast with the latter, many (20 percent) have two rows of pharyngeal teeth. Thus, the differences in ecological (growth rate, condition factor, spawning times, etc.) and meristic and plastic characters (branched rays, enlarged fins, etc.) as well as in composition of parasites point to the development of an isolated bream population.

  13. Protection and safety of nuclear power stations

    International Nuclear Information System (INIS)

    Anon.

    1976-01-01

    The extreme requirements for the safety of nuclear power stations set tasks to the civil engineer which, resulting from dynamic load assumptions, among other things also demand the development of novel special concrete steels with a high elastic limit (here: DYWIDAG thread tie rod) for singly reinforced members. (orig.) [de

  14. Lifetime management of Magnox power stations

    International Nuclear Information System (INIS)

    Smitton, C.

    1998-01-01

    Magnox Electric, which is, a subsidiary of BNFL, operates six nuclear power plants that have an average age of about 33 years. The procedures developed to maintain the plants and ensure nuclear safety in longer-term operation are reviewed. The technical limit on station lifetimes is expected to be determined by the effect of ageing on major reactor structures where replacement is impractical. Examination of the effect of ageing confirms that the stations are capable of operating to a life of at least 40 years. The economic factors affecting operation are reviewed, recognising the need to sell electricity in a competitive market. Recently Magnox Electric and BNFL have merged and all plant supporting Magnox operations are now within a single integrated company that will provide further opportunities for improved efficiency. (author)

  15. Evaluation of environmental impacts caused by hydroelectric power plants in native forest areas and mitigation measures

    International Nuclear Information System (INIS)

    Ramalho, Cyro Pinheiro

    1992-01-01

    The following work has the intention of demonstrating the importance of native forest to the human life, not only through its inherent qualities as something to preserve, but also as a source of great resources, and in particular hydroelectric resource that, by today's necessities are bounded to be explored. The negative effects caused by the implementation of a hydroelectric plant are shown together with the necessity of adoption of measures that would soften the environment impact of it. For the adoption of those measures, many forest studies were proposed in the search for its complete characterization. Each of these studies are duly defined and presented in their general and specific goals. The most adequate methodology is finally recommended. (author). 14 refs

  16. Sizewell 'B' power station public inquiry: CEGB proof of evidence

    International Nuclear Information System (INIS)

    Henderson, B.

    1982-11-01

    Architectural concepts and design proposals associated with the proposed Sizewell B power station are outlined. The figures are in a separate volume. They consist of the site layout plan, an axonometric drawing of the site, an elevations drawing and a colour perspective drawing of 'A', 'B' and 'C' stations. (U.K.)

  17. Insurance of nuclear power stations

    International Nuclear Information System (INIS)

    Debaets, M.

    1992-01-01

    Electrical utility companies have invested large sums in the establishment of nuclear facilities. For this reason it is normal for these companies to attempt to protect their investments as much as possible. One of the methods of protection is recourse to insurance. For a variety of reasons traditional insurance markets are unable to function normally for a number of reasons including, the insufficient number of risks, an absence of meaningful accident statistics, the enormous sums involved and a lack of familiarity with nuclear risks on the part of insurers, resulting in a reluctance or even refusal to accept such risks. Insurers have, in response to requests for coverage from nuclear power station operators, established an alternative system of coverage - insurance through a system of insurance pools. Insurers in every country unite in a pool, providing a net capacity for every risk which is a capacity covered by their own funds, and consequently without reinsurance. All pools exchange capacity. The inconvenience of this system, for the operators in particular, is that it involves a monopolistic system in which there are consequently few possibilities for the negotiation of premiums and conditions of coverage. The system does not permit the establishment of reserves which could, over time, reduce the need for insurance on the part of nuclear power station operators. Thus the cost of nuclear insurance remains high. Alternatives to the poor system of insurance are explored in this article. (author)

  18. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS

    International Nuclear Information System (INIS)

    Tramontina, Juliana; Breunig, Fabio Marcelo

    2015-01-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  19. Mini hydro electric power stations Lukar 1,2,3,4: Public enterprise (JP) Komunalec

    International Nuclear Information System (INIS)

    Stojanova, Blagica

    2004-01-01

    The role of the Public enterprises in improving entire living conditions of the citizens, not only by its services towards the citizenship such as: water supplying and public hygiene but the opportunity to produce the electric power by the Mini hydro electric-power stations built on the main city water supply pipes. The paper presents experiences of building the mini hydro electric power stations Lukar 1,2,3,4. The successful completion of this project should be a motivation for building more electric power stations because there are great water potential in the Republic of Macedonia i.e. there have been recorded more than a hundred places suitable for construction of power electric stations. This will contribute not only for clean ecological energy but will have a direct influence on the total economic development of the Republic of Macedonia. (Author)

  20. Hygienic situation in the site of nuclear power stations in Fukushima Prefecture

    International Nuclear Information System (INIS)

    Sakka, Masatoshi

    1984-01-01

    In the Fukushima No. 1 Nuclear Power Station in Fukushima Prefecture, the hygienic statistics for ten years each before and after the start of the power station were compared between the surrounding radiation monitoring area and the reference area without such monitoring, both areas containing populations. There was no difference at all between the two areas. It was thus shown that the nuclear power generation had no adverse effect on the health of the people. The following statistics in both areas concerning the health of the populations are described: external exposure dose, internal exposure sources, whole-body exposure dose, the change of the hygienic state around the power station, the number of deaths and mortality in the areas, the deaths from cancer in the areas, the health of children, the causes of deaths in Fukushima Prefecture. (Mori, K.)