WorldWideScience

Sample records for hydroelectric power production

  1. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    Understanding the dynamics of these variables, and the correlation b etween them are core to proper planning and management of a hydroelectric power station. In this Study, simple mathematical methods that include linear programming and statistical analysis based on simulation techniques were used to evaluate vital ...

  2. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  3. Small-Scale Hydroelectric Power Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  4. FORESIGHT - ECOSUSTAINABLE DETERMINANTS OF STRATEGIC MODERNIZATION OF HYDROELECTRIC POWER PLANTS

    Directory of Open Access Journals (Sweden)

    L. Dovgan

    2015-08-01

    Full Text Available In the paper the foresight methodology as an ecosustainable determinants of strategic modernization of hydroelectric power plants in the conditions of the external challenges and threats is revealed. The strategic concepts of modernization and a mechanism of strategic modernization of hydroelectric power plants on the principles of public-private partnerships is allocated. Recommendations on the implementation of the results of the strategic foresight to the modernization of hydroelectric power plants in the interaction of public and private agents are formulated.

  5. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  6. Mathematical models for long-term management of a hydroelectric power production network. Modeles mathematiques pour la gestion a long terme d'un reseau de production hydro-electrique

    Energy Technology Data Exchange (ETDEWEB)

    Bouchard, H.

    1993-08-01

    The problem of long-term (5-20 y) management of an electric power producing network where hydroelectric power dominates is analyzed. The various aspects of a computerized system used to aid in the management of a network of hydroelectric reservoirs are studied as well as the different mathematical models which are applicable. An aggregate model is first considered in which the problem of water management in the reservoirs, the key problem in long-term planning, is handled by replacing multiple stocks of water in multiple reservoirs by a single imaginary reservoir. Two aggregation studies are performed: the first examining the hypothesis of independence between the water level in a reservoir and the production factor of the downstream plant, and the second in which the production factor varies with the level of the upstream reservoir. The function of sales profit is then examined in a study of the optimization of short-term profit. Long term management decisions are subsequently studied using discrete stochastic dynamic programming. The matrix-based ARMA model is used to simulate natural inputs to the reservoirs. Four cases of ARMA models are considered: stationary univariant, periodic univariant, stationary multivariant and periodic multivariant. 49 refs., 2 tabs.

  7. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    Introduction about hydroelectric powers plants (small scale). May 2000,. Yaoundé, Cameroun. 51pp. Lejeune A. et Toplicéanu I., 2004. Energie. Renouvelables et Cogénération pour le. Développement Durable en Afrique. Colloque. International, ENSP Université de Yaoundé I. 246pp. Linsley R. K. and Franzini J.B., 1972.

  8. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  9. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  10. improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    HOD

    conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electricity, the .... build–up of the models and solution contained therein are based. System dynamics (SD) is a ..... Reclamation Power Resources Office, July 2005, demand for electrical power ...

  11. 33 CFR 209.141 - Coordination of hydroelectric power operations with power marketing agencies.

    Science.gov (United States)

    2010-07-01

    ... power operations with power marketing agencies. 209.141 Section 209.141 Navigation and Navigable Waters... Coordination of hydroelectric power operations with power marketing agencies. (a) Purpose. This regulation... generating facilities with the power marketing agencies. (b) Applicability. This regulation applies to all...

  12. Woodruff Narrows low head hydroelectric power plant feasibility determination

    Energy Technology Data Exchange (ETDEWEB)

    1979-03-01

    Woodruff Narrows Reservoir, owned by the State of Utah, was built in 1961 as an irrigation reservoir. The reservoir outlet works and spillway are in need of repair, and plans have been made to enlarge the reservoir from its present capacity of 28,000 acre-feet to 53,200 acre-feet when these repairs are made. The purpose of this study was to determine if it is feasible to add hydropower facilities when the reservoir is repaired and enlarged. A computer simulation model based on mean monthly values, utilizing 26 years of recorded streamflow into the reservoir, was used to determine the mean annual energy potential for the following configurations: (1) present dam, (2) the proposed enlarged dam, (3) a new dam at the lower site with a maximum head of 65 feet, and (4) a new dam at the lower site which would store water to the same elevation as the proposed enlarged dam. Results of the simulation study show that maximum power capacities are respectively 2.1, 3.0, 3.9, and 4.5 megawatts. The marketing potential for this electric power, cost estimates and financial analysis, and environmental, social, and regulatory aspects of the proposed hydropower facilities were evaluated. The results showed the addition of hydroelectric power development at the Woodruff Narrows site would have minimal social and environmental effects on the area, would result in little or no changes in the present patterns of water and land use, income, population, and employment and would not result in any significant changes of the social structure or characteristics of the area. However, hydroelectric power development at the Woodruff Narrows site is not economically feasible at the present time. (LCL)

  13. The Victoria Project, Sri Lanka: Victoria Power-Station. [Hydroelectric power

    Energy Technology Data Exchange (ETDEWEB)

    Creber, B. (Sir Alexander Gibb and Partners (GB))

    1991-04-01

    The Victoria Hydroelectric Power-Station forms part of the Victoria Project on the Mahaweli Ganga in Sri Lanka and it provides the country's largest single power source. The Paper describes the planning, design and construction of the civil engineering works, including problems encountered, and also describes, in outline, the electrical and mechanical works. (Author).

  14. Counter rotating type hydroelectric unit suitable for tidal power station

    Energy Technology Data Exchange (ETDEWEB)

    Kanemoto, T [Faculty of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan); Suzuki, T, E-mail: turbo@tobata.isc.kyutech.ac.j [Graduate School of Engineering, Kyushu Institute of Technology, Sensui 1-1, Tobata, Kitakyushu 804-8550 (Japan)

    2010-08-15

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  15. Effect of time lag upon the economical operation of cascade hydroelectric power stations

    Energy Technology Data Exchange (ETDEWEB)

    Deng, X.

    1982-01-01

    In this paper we discretize the state parameter - flow of cascade hydroelectric power stations - into the step function of time variable, and use constrained nonlinear programming to establish a mathematical model of economical operation which is universally applicable for general cascade hydroelectic power stations, and then the primary factors which affect the value of the time lag are discussed. According to each case of different values of the time lag, the formulas for calculating the gradient of augmented objective functions and other important formulas which will be used in SUMT for optimization are derived. Furthermore, the functional relation between the time lag and the state of operation of cascade hydroelectric power stations is derived. The situations in which the time lag will cause the mutual relation between hydroelectric power stations to change were studied. Finally, the affect that time lag will have on the economical operation of cascade hydroelectric power stations is discussed.

  16. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  17. Small-Scale Hydroelectric Power Demonstration Project. Pennsylvania Hydroelectric Development Corporation Flat Rock Dam: Project summary report

    Energy Technology Data Exchange (ETDEWEB)

    Gleeson, L.

    1991-12-01

    The US Department of Energy Field Office, Idaho, Small-Scale Hydroelectric Power Program was initiated in conjunction with the restoration of three power generating plants in Idaho Falls, Idaho, following damage caused by the Teton Dam failure on June 5, 1976. There were many parties interested in this project, including the state and environmental groups, with different concerns. This report was prepared by the developer and describes the design alternatives the applicant provided in an attempt to secure the Federal Energy Regulatory Commission license. Also included are correspondence between the related parties concerning the project, major design alternatives/project plan diagrams, the license, and energy and project economics.

  18. Legal obstacles and incentives to the development of small scale hydroelectric power in New Jersey

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in New Jersey are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is discussed. New Jersey follows the riparian theory of water law. Following an extensive discussion of the New Jersey water law, New Jersey regulatory law and financial considerations regarding hydroelectric power development are discussed.

  19. Development of Newfoundland Power`s Rose Blanche hydroelectric power project

    Energy Technology Data Exchange (ETDEWEB)

    Hunter, M.C.

    1999-08-01

    The 6.0 Mw Rose Blanche hydroelectric development is located on the southwest portion of the island of Newfoundland. This is the first new development by Newfoundland Power since 1983 and was a learning experience because of changes in regulatory requirements, available technologies and the working relationships between suppliers and contractors. Environmental issues dealt with included a five year assessment process, fisheries compensation/enhancement, minimum streamflow requirements, and construction and emergency preparedness plans. Technical issues included the use of spiral welded steel penstock, design and construction of an earthfill concrete face dam, and turbine generator design and control systems. There was a necessity to build the plant in one construction season and the plant was synchronized to the system in December 1998. The approach taken by the design and construction team was cooperative as they worked together with suppliers and contractors to develop the most expedient and cost effective methods of construction.

  20. Small hydroelectric power plant St. Marienthal Monastery, Ostritz; Kleinwasserkraftanlage Kloster St. Marienthal, Ostritz

    Energy Technology Data Exchange (ETDEWEB)

    Kubens, C. [KUBENS Ingenieurgesellschaft mbH, Nuernberg (Germany)

    2003-07-01

    The hydroelectric power plant St. Marienthal Monastery on the river Lausitzer Neisse, which forms part of the border between Poland and Germany, was rehabilitated and modernized in the period between October 1999 and September 2000. The scheme to reactivate this plant was implemented as an external EXPO 2000 project for renewable energy production and sustainable management. On 6 October 2000, the hydroelectric power plant was officially put back into operation by Steffen Flath, Minister for the Environment and Agriculture in the German state of Saxony. The paper describes the special planning factors involved and the execution of construction work. (orig.) [German] Die Erneuerung der Wasserkraftanlage Kloster St. Marienthal an der Lausitzer Neisse, dem Grenzgewaesser zwischen Polen und Deutschland erfolgte als externes EXPO 2000-Projekt fuer alternative Energiegewinnung und nachhaltiges Wirtschaften von Oktober 1999 bis September 2000. Am 6. Oktober 2000 konnte die Wasserkraftanlage vom Saechsischen Staatsminister fuer Umwelt und Landwirtschaft Steffen Flath nach kirchlicher Weihe in Betrieb genommen werden. Ueber die Besonderheiten der Planung sowie die Bauausfuehrung wird berichtet. (orig.)

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  2. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  3. The Effect of Hydroelectric Power Plants (hpp) on Agro-Life at Rural Land Regulation in Turkey

    Science.gov (United States)

    Onursal Denli, G.; Denli, H. H.; Seker, D. Z.; Bitik, E.; Cetin, S.

    2014-12-01

    Turkey is one of the self-sufficient in foodstuffs and globally ranks as 7th significant agricultural exporter in the world. Main trading partners are the European Union, the United States and the Middle East. As known, agricultural production is dependent on factors including efficient and effective use of all inputs ranging from those natural resources as in land and water to well-trained human resources as labour at the production. The socio-economic aspects of this sector take several forms ranging from the incomes of the primary producers. Rural land regulation is a necessity for rural areas and is regarded as a useful instrument for improving farmer's incomes and life standards. The irrigation system, established during the rural regulation/land consolidation period of large-scale farming, is insufficiently adjusted to the new land tenure structures. The government is especially in the process of water management with hydroelectric power plants. This process produces energy that is required but effects negatively the rivers and agricultural, environmental, climatic conditions. Rivers are vessels of the nature. Free flowing rivers give life to all nature. Most of the studies indicate that Hydroelectric Power Plants (HPP) affects the surface and ground-water management, natural life, agricultural productivity, socio-economic situation at agricultural regions and agro-life related with immigration. This study emphasizes the effect of Hydroelectric Power Plants which are used in transformation of water as a renewable natural resource into electricity power from the perspective of environmental policies and rural regulation.

  4. Report on the development perspectives of the hydroelectric production in France; Rapport sur les perspectives de developpement de la production hydroelectrique en France

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-03-15

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  5. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  6. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  7. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M.; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  8. Hydroelectric power in Westphalia - inventory taking. Vol. 1. The Guetersloh district. Wasserkraft in Westfalen. Bestandsaufnahme. Bd. 1. Kreis Guetersloh

    Energy Technology Data Exchange (ETDEWEB)

    Hoebel, C.; Brepohl, W.

    1986-11-01

    The hydroelectric power plants located in the Guetersloh district were recorded and entered in standard forms to compile data informing about their sites, technical status, suitability for energy utilization, hydrological aspects, and entitlement to preservation. The records and inventories filed will be serving to compare the technical and structural historical value of different plants throughout North-Rhine Westphalia (e.g. corn mills, oil mills, fulling mills, iron mills, hydroelectric power plants), and help to select plants to be considered ancient monuments in the sense of the law. Retrofitting and restoration programs are about to be developed for some of the Guetersloh hydroelectric power plants identified as being worth preserving. (BR).

  9. Development of an HTS hydroelectric power generator for the hirschaid power station

    Energy Technology Data Exchange (ETDEWEB)

    Fair, Ruben; Lewis, Clive; Eugene, Joseph; Ingles, Martin, E-mail: ruben.fair@converteam.co [Advanced Technology Group, Converteam, Rugby, CV21 1BD (United Kingdom)

    2010-06-01

    This paper describes the development and manufacture of a 1.7MW, 5.25kV, 28pole, 214rpm hydroelectric power generator consisting of superconducting HTS field coils and a conventional stator. The generator is to be installed at a hydro power station in Hirschaid, Germany and is intended to be a technology demonstrator for the practical application of superconducting technology for sustainable and renewable power generation. The generator is intended to replace and uprate an existing conventional generator and will be connected directly to the German grid. The HTS field winding uses Bi-2223 tape conductor cooled to about 30K using high pressure helium gas which is transferred from static cryocoolers to the rotor via a bespoke rotating coupling. The coils are insulated with multi-layer insulation and positioned over laminated iron rotor poles which are at room temperature. The rotor is enclosed within a vacuum chamber and the complete assembly rotates at 214rpm. The challenges have been significant but have allowed Converteam to develop key technology building blocks which can be applied to future HTS related projects. The design challenges, electromagnetic, mechanical and thermal tests and results are presented and discussed together with applied solutions.

  10. National Hydroelectric Power Resources Study. Preliminary Inventory of Hydropower Resources. Volume 3. Mid-Continent Region.

    Science.gov (United States)

    1979-07-01

    utilizing water pumped into a storage reservoir, usually during off—peak hours. SMALL—SCALE HYDROELECTR IC POWER PLANT: A hydroelect r ic generating station ...inventory . In particular , the supplemental data included the designation of a U.S. Geological Survey (U.s.G.S.) reference gaging station ; a refined...maximum load which a generator, generating station , or other electrical apparatus can supply under specified conditions for a given period of time

  11. NEURAL CASCADED WITH FUZZY SCHEME FOR CONTROL OF A HYDROELECTRIC POWER PLANT

    OpenAIRE

    A. Selwin Mich Priyadharson; T. Ramesh Kumar; M. S. Saravanan; C. ThilipKumar; D. Dileepan

    2014-01-01

    A novel design for flow and level control in a hydroelectric power plant using Programmable Logic Controller (PLC)-Human Machine Interface (HMI) and neural cascaded with fuzzy scheme is proposed. This project will focus on design and development of flow and level controller for small scale hydro generating units by implementing gate control based on PLC-HMI with the proposed scheme. The existing control schemes have so many difficulties to manage intrinsic time delay, nonlinearity due to unce...

  12. Herpetofauna, Espora Hydroelectric Power Plant, state of Goiás, Brazil.

    Directory of Open Access Journals (Sweden)

    Vaz-Silva, W.

    2007-01-01

    Full Text Available We provide a checklist of the herpetofaunal assemblage from Espora Hydroelectric Power Plant region(UHE Espora, southwestern of the state of Goiás, Brazil. Representatives of 32 amphibian and 71 reptile species wereobtained during faunal monitoring and faunal rescue programs carried out in the study area. The obtained species listand distribution records are here discussed in an attempt to improve the still limited knowledge on Cerradoherpetofaunal assemblages.

  13. National Hydroelectric Power Resources Study: Environmental Assessment. Volume 8

    Science.gov (United States)

    1981-09-01

    bioaccumulation related to pesticides and industrial chemicals in the Great Lakes region and other areas. In addition, anoxic conditions from thermal... hydrothermal power program." DOE/EIS-0066. U.S. Government Printing Office, Washington, D.C. U.S. Department of Energy, January 1979a. "A Review of State

  14. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  15. Wind energy and Swiss hydroelectric power; Windenergie und schweizerischer Wasserkraftpark

    Energy Technology Data Exchange (ETDEWEB)

    Ott, W.; Baur, M. [Econcept AG, Zuerich (Switzerland); Fritz, W.; Zimmer, Ch.; Feldmann, J. [Consentec GmbH, Aachen (Germany); Haubrich, H.-J.; Dany, G.; Schmoeller, H.; Hartmann, T. [Institut fuer Elektrische Anlagen und Energiewirtschaft RWTH Aachen (IAEW), Aachen (Germany)

    2004-07-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the results of a study made to analyse the possible changes in the European electricity supply system, in particular with reference to the increasing amount of wind-generated electricity. Also, the role of peak-power and the optimisation potential for Swiss hydropower was examined. The part to be played by Swiss wind power in the future and the government's sustainability strategy is also looked at. The report looks at electricity dealing in the European context and introduces a method of assessment for Swiss hydropower. The report's conclusions and recommendations cover the increasing importance of energy storage in hydropower schemes, the question if grid capacity is sufficient under the new conditions, the market liberalisation question and possible ecological problems that may be encountered.

  16. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Hydroelectric Project (Project) is located at river mile 72.0 on the Flathead River, just downstream from... to, effects on hydroelectric power production, recreation, tourism, irrigation, flooding, treaty...

  17. Small-scale hydroelectric power in the Pacific Northwest: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    Energy supply is one of the most important issues facing Northwestern legislators today. To meet the challenge, state legislatures must address the development of alternative energy sources. The Small-Scale Hydroelectric Power Policy Project of the National Conference of State Legislators (NCSL) was designed to assist state legislators in looking at the benefits of one alternative, small-scale hydro. Because of the need for state legislative support in the development of small-scale hydroelectric, NCSL, as part of its contract with the Department of Energy, conducted the following conference on small-scale hydro in the Pacific Northwest. The conference was designed to identify state obstacles to development and to explore options for change available to policymakers. A summary of the conference proceedings is presented.

  18. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 3. Mid-Continent region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The US Corps of Engineers' assessment of the nation's hydroelectric resources provides a current and comprehensive estimate of the potential for incremental or new generation at existing dams and other water resource projects, as well as for undeveloped sites in the US. The demand for hydroelectric power is addressed and various related policy and technical considerations are investigated to determine the incentives, constraints, and impacts of developing hydropower to meet a portion of the future energy demands. The comprehensive data represent the effort of the Corps of Engineers based on site-specific analysis and evaluation. Summary tables include estimates of the potential capacity and energy at each site in the inventory. The number of sites and potential capacity in each state are identified, but specific detailed information is included for sites in Colorado, Kansas, Montana, Nebraska, New Mexico, North Dakota, Oklahoma, South Dakota, Texas, and Wyoming.

  19. Legal obstacles and incentives to the development of small scale hydroelectric power in Connecticut

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric power in Connecticut are discussed. The Federal government also exercises extensive regulatory authority in the area and this dual system is examined from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. Connecticut follows the riparian theory of water law. Under this theory of the water law, private rights in rivers and streams are confined to the use of flowing water. A riparian proprietor does not own the water that flows by his estate. Licensing, permitting, and review procedures are discussed followed by discussion on public utilities regulation and indirect considerations.

  20. Legal obstacles and incentives to the development of small scale hydroelectric power in Ohio

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level is described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. A developer must obtain title or interest to a streambed from the proper riparian owners. Ohio provides assistance to an electric company in this undertaking by providing it with the power of eminent domain in the event it is unable to reach a purchase agreement with the riparian proprietors. The Ohio Water Law is discussed in detail, followed by discussions: Licensing, Permitting, and Review Procedures; Indirect Considerations; Ohio Public Utilities Commission; Ohio Department of Energy; Incidental Provision; and Financial Considerations.

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in West Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric in West Virginia at the state level are described. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by FERC. The development of small-scale hydroelectric energy depends on the selection of a site which will produce sufficient water power capacity to make the project economically attractive to a developer. In West Virginia, the right to use the flowing waters of a stream, creek, or river is appurtenant to the ownership of the lands bordering the watercourse. The lands are known as riparian lands. The water rights are known as riparian rights. Thus, the first obstacle a developer faces involves the acquisition of riparian lands and the subsequent right to the use of the water. The water law in West Virginia is discussed in detail followed by discussions on direct and indirect regulations; continuing obligations; financial considerations; and interstate organizations.

  2. Legal obstacles and incentives to the development of small scale hydroelectric power in New York

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step the small scale hydroelectric developer must take is that of acquiring title to the real property comprising the development site. The real estate parcel must include the requisite interest in the land adjacent to the watercourse, access to the underlying streambed and where needed, the land necessary for an upstream impoundment area. Land acquisition may be effectuated by purchase, lease, or grant by the state. In addition to these methods, New York permits the use of the eminent domain power of the state for public utilities under certain circumstances.

  3. Environmental Impact Assessment: Uri hydroelectric power project on River Jhelum in Kashmir, India

    Energy Technology Data Exchange (ETDEWEB)

    Nyman, L.

    1995-09-01

    This report is an Initial Aquatic Environmental Impact Assessment of the Uri Hydroelectric Power Project on River Jhelum in Kashmir, India. It includes the Terms of Reference of the assessment, a discussion on biodiversity and threats to it, the environmental indicators used to monitor and predict the impacts, a description of the physical, chemical and biological prerequisites of the River Jhelum ecosystem, a description of the survey sites chosen, and an overview of the present fish and bottom fauna. Finally, there are sections on the potential impacts on biota of the Uri Project and a list of proposals for how mitigating and enhancing measures could be enforced

  4. Monitoring headloss caused by debris on hydro-electric power intake trashracks

    Energy Technology Data Exchange (ETDEWEB)

    Abdelnour, R.; Gong, Y.; Comfort, G. [Fleet Technology Ltd., Kanata, ON (Canada)

    1996-06-01

    The importance of power generation losses at hydro-electric power dams from debris (mostly logs) and ice accumulation was discussed. A system which could monitor headlosses due to debris accumulation at water intake trashracks, was described. Two systems were used at the Chelsea power plant in Quebec. The systems consisted of measuring the water levels of the reservoir and the tailrace. The amount of power generated and the turbine rating curves were used to determine the headlosses. The headlosses due to trash were calculated in real time. Results demonstrated the reliability of the system and showed that it could be implemented at most low head dams in Canada at a reasonable cost. 4 refs., 7 tabs., 6 figs.

  5. Impact of High Wind Power Penetration on Hydroelectric Unit Operations in the WWSIS

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B.-M.; Lew, D.; Milligan, M.

    2011-07-01

    This report examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating patterns are examined both for an aggregation of all hydro generators and for select individual plants.

  6. Impact of High Wind Power Penetration on Hydroelectric Unit Operations: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Hodge, B. M.; Lew, D.; Milligan, M.

    2011-10-01

    This paper examines the impact of this large amount of wind penetration on hydroelectric unit operations. Changes in hydroelectric unit operating unit patterns are examined for an aggregation of all hydro generators.

  7. Influence of the Amazon Hydrological Regime on Eutrophication Indicators of a Hydroelectric Power Plant Reservoir.

    Science.gov (United States)

    Freire, Jean Carlos A; Hauser-Davis, Rachel Ann; da Costa Lobato, Tarcísio; de Morais, Jefferson M; de Oliveira, Terezinha F; F Saraiva, Augusto Cesar

    2017-05-01

    Dam constructions in the Amazon have increased exponentially in the last decades, causing several environmental impacts and serious anthropogenic impacts in certain hydroelectric power plant reservoirs in the region have been identified. The assessment of the trophic status of these reservoirs is of interest to indicate man-made changes in the environment, but must take into account the hydrological cycle of the area. This can be relevant for environmental management actions, aiding in the identification of the ecological status of water bodies. In this context, physico-chemical parameters and eutrophication indicators were determined in a hydroelectric power plant reservoir in the Brazilian Amazon to assess trophic variations during the regional hydrological regime phases on the reservoir, namely dry, filling, full and emptying stages. The local hydrological regimes were shown to significantly influence TSS and turbidity, as well as NH 4 , NO 3 , PO 4 , with higher values consistently observed during the filling stage of the reservoir. In addition, differences among the sampling stations regarding land use, population and anthropogenic activities were reflected in the PO 4 3- values during the different hydrological phases.

  8. Open system architecture for condition based maintenance applied to a hydroelectric power plant

    Energy Technology Data Exchange (ETDEWEB)

    Amaya, E.J.; Alvares, A.J. [University of Brasilia (UnB), DF (Brazil). Mechanical and Mechatronic Dept.], Emails: eamaya@unb.br, alvares@AlvaresTech.com; Gudwin, R.R. [State University of Campinas (UNICAMP), SP (Brazil). Computer Engineering and Industrial Automation Dept.], E-mail: gudwin@dca.fee.unicamp.br

    2009-07-01

    The hydroelectric power plant of Balbina is implementing a condition based maintenance system applying an open, modular and scalable integrated architecture to provide comprehensive solutions and support to the end users like operational and maintenance team. The system called SIMPREBAL (Predictive Maintenance System of Balbina) is advocate of open standards, in particular through collaborative research programmers. In the developing is clearly understands the need for both, industry standards and a simple to use software development tool chain, supporting the development of complex condition based maintenance systems with multiple partners. The Open System Architecture for Condition Based Maintenance (OSA-CBM) is a standard that consider seven hierarchic layers that represent a logic transition or performed data flow from the data acquisition layer, through the intermediates layers as signal processing, condition monitor, health assessment, prognostics and decision support, to arrive to the presentation layer. SIMPREBAL is being implementing as an OSA-CBM software framework and tool set that allows the creation of truly integrated, comprehensive maintenance solutions through the internet. This paper identifies specific benefits of the application of the OSA-CBM in comprehensive solutions of condition based maintenance for a hydroelectric power plant. (author)

  9. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 5. Southeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Southeast region, the maximum physical potential for all sites exceeds 48,000 MW with an estimated average annual energy of more than 137,000 GWH. By comparison, these values represent about 9% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 11,800 MW has been installed. The remainder (36,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (13,000 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (23,200 MW). Small-scale facilities account for some 2% of the region's total installed capacity, but another 700 MW could be added to these and other small water-resource projects. In addition, 1100 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of North Carolina and South Carolina having the largest potential for incremental development at existing projects in the Southeast region. The Southeast region is composed of Arkansas, Louisiana, Mississippi, Tennessee, Alabama, Georgia, Florida, South Carolina, North Carolina, and Virginia.

  10. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 6. Northeast region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    In the Northeast region, the physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy of some 153,000 GWH. By comparison, the available data represent about 6% of the total capacity and 11% of the hydroelectric energy potential estimated for the entire US. Of the total capacity estimated for the region, 6100 MW has been installed. The remainder (27,200 MW, excluding the undeveloped capacity in the New England States) is the maximum which could be developed by upgrading and expanding existing projects (18,700 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (8500 MW). Small-scale facilities account for about 15% of the region's total installed capacity, but another 1800 MW could be added to these and other small water-resource projects. In addition, 500 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of New York, Maine, and New Hampshire having the largest potential for incremental development at existing projects in the Northeast region. West Virginia, Maryland, Delaware, New Jersey, Pennsylvania, New York, Connecticut, Massachusetts, Rhode Island, New Hampshire, Vermont, and Maine comprise the Northeast region.

  11. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 4. Lake Central region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Lake Central region, the maximum physical potential for all sites exceeds 26,000 MW with an estimated average annual energy of more than 75,000 GWH. By comparison, these values represent about 5% of both the total potential capacity and hydroelectric energy estimated for the entire US. Of the total capacity estimated for the region, 2600 MW has been installed. The remainder (23,600 MW) is the maximum which could be developed by upgrading and expanding existing projects (15,800 MW), and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (7800 MW). Small-scale facilities account for some 24% of the region's total installed capacity, but another 900 MW could be added to these and other small water-resource projects. In addition, 900 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of Michigan and Wisconsin having the largest potential for incremental development at existing projects in the Lake Central region. This Lake Central region is composed of Minnesota, Wisconsin, Michigan, Ohio, Indiana, Illinois, Kentucky, Missouri, and Iowa.

  12. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 2. Pacific Southwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The estimates of existing, incremental, and the undeveloped hydropower potential for all states in the various regions of the country are presented. In the Pacific Southwest region, the maximum physical potential for all sites exceeds 33,000 MW of capacity with an estimated average annual energy greater than 85,000 GWH. By comparison, these values represent about 6% of the total potential capacity and hydroelectric energy generation estimated for the entire US. Of the total capacity estimated for the region, 9900 MW has been installed. The remainder (23,200 MW) is the maximum which could be developed by upgrading and expanding existing projects (6000 MW) and by installing new hydroelectric power capacity at all potentially feasible, undeveloped sites (17,200 MW). Small-scale facilities account for less than 4% of the region's total installed capacity, but another 600 MW could be added to these and other small water resource projects. In addition, 600 MW could be installed at potentially feasible, undeveloped small-scale sites. The small-scale resource varies considerably, with the states of California and Utah having the largest potential for incremental development at existing projects in the Pacific Southwest region. States comprising the Southwest are Arizona, California, Hawaii, Nevada, and Utah.

  13. Project final report: Energetic planning focusing small scale hydroelectric power plants; Relatorio final. Projeto planejamento energetico com enfase em pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Costa, Yara dos Santos

    1994-12-31

    Considering the increasing need for a better utilization of the Brazilian hydric resources, a deeper analysis of small scale hydroelectric power plants has been demanding. This work presents a case study of energetic planning based upon small scale hydroelectric power plants in a district of Amazon state - North Brazil 8 refs., 11 figs., 19 tabs.

  14. Feasibility determination of low head hydroelectric power development at existing sites: Mousam River Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    The technical and economic feasibility of low head hydroelectric power development at existing sites along the Mousam River in southeastern Maine was studied. The following areas were investigated: determination of available energy; development of restoration concepts; environmental studies; historical and archeological studies; assessment of civil construction requirements; geotechnical and geologic assessment of existing dams; assessment of turbine alternatives; assessment of generator and utility interface alternatives; economic analysis; and restoration concept evaluation and selection. The results of the hydropower evaluation showed that: of the seven sites evaluated, only four can be considered economically feasible for refurbishment at this time; the use of used and/or rebuilt equipment is more economically attractive than new equipment; the cost of equipment at each site was of the same order as the cost of the dam reconstruction; and the cost of fuel prices will be the determining feature of whether the sites should be reconstructed.

  15. Ticks (Acari: Ixodidae on wild animals from the Porto-Primavera Hydroelectric power station area, Brazil

    Directory of Open Access Journals (Sweden)

    Marcelo B Labruna

    2002-12-01

    Full Text Available From June 2000 to June 2001, a total of 741 ticks were collected from 51 free-living wild animals captured at the Porto-Primavera Hydroelectric power station area, located alongside an approximately 180 km course of the Paraná river, between the states of São Paulo and Mato Grosso do Sul, comprising 9 species of 3 genera: Ambly-omma (7 species, Boophilus (1 and Anocentor (1. A total of 421 immature Amblyomma ticks were reared in laboratory until the adult stage, allowing identification of the species. A. cajennense was the most frequent tick species (mostly immature stages collected on 9 host species: Myrmecophaga tridactyla, Tamandua tetradactyla,Cerdocyon thous, Puma concolor,Tayassu tajacu, Mazama gouazoubira,Hydrochaeris hydrochaeris,Alouatta caraya, Cebus apella. Other tick species were less common, generally restricted to certain host taxa.

  16. Herpetofauna, Santa Edwiges I and II hydroelectric power plants, state of Goiás, Brazil

    Directory of Open Access Journals (Sweden)

    Cintra, C. E. D.

    2009-01-01

    Full Text Available This paper presents a check list of amphibians and reptiles of the area under the influence of Santa Edwiges I and IIsmall hydroelectric power plants on Rio Buritis, state of Goiás, Brazil. The list was the result of faunal rescueoperations carried out between 31 August and 29 September 2005 (Santa Edwiges II and between 30 July and 12September 2006 (Santa Edwiges I. The list comprises 30 species of amphibians belonging to 16 genera and 8 families(Caeciliidae, Bufonidae, Cycloramphidae, Hylidae, Brachycephalidae, Leiuperidae, Leptodactylidae, andMicrohylidae, and 45 species of reptiles belonging to 38 genera and 16 families (Amphisbaenidae, Anguidae,Gekkonidae, Gymnophtalmidae, Polychrotidae, Scincidae, Teiidae, Tropiduridae, Anomalepididae, Leptotyphlopidae,Typhlopidae, Boidae, Colubridae, Dipsadidae, Elapidae, and Viperidae.

  17. What is the real price of hydroelectric production on the Senegal River?

    Science.gov (United States)

    Raso, Luciano; Bader, Jean-Claude; Malaterre, Pierre-Olivier

    2014-05-01

    Manantali is an annual reservoir on the Senegal River, located in Mali and serving Senegal and Mauritania. The reservoir is used to regulate the flow for hydroelectric production, in the face of the extremely variable seasonal climate of the region. Manantali has been operative for about 10 years now, exceeding the planned production capacity. The economic benefit comes at a price. Before the dam's construction, the annual flood was the basis of flood recession agriculture, traditionally practiced by the local population. Hydroelectric production requires a more regular flow; therefore flow peaks that used to create the flood are now dumped in the reservoir. Floods are reduced because the current reservoir management privileges hydroelectric production to flood recession agriculture. Moreover, the local water authority is evaluating the construction of 6 more reservoirs, which will enhance even further the controllability of the river flow. This study assesses the externalities of energy production for the agricultural production, quantifying the reduction of flooded surface when energy production is maximized, or alternatively, the loss energy production to maintain a minimum sustainable flood. In addition, we examine the system reliability against extreme events, and how a better use of hydrological information can improve the present reservoir management, in order to find a win-win solution. In this study we employ Stochastic Dual Dynamic Programming (SDDP) methodology. SDDP is a leaner version of Stochastic Dynamic Programming (SDP). SDDP does not suffer of the "curse of dimensionality", and therefore it can be applied to larger systems. In this application we include in the model: i) A semi-distributed hydrological model, ii) the reservoir, iii) the hydraulic routing process within the catchment and from the reservoir to the floodplain.

  18. Feasibility of determination of low-head hydroelectric power development at existing sites. Big Blue River Co-dependent Hydroelectric Development: feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Wacker, H. Steve; Feuerberg, Stan; Lawrence, John D.; Pal, Parimal C.; Trick, Dr., William T.

    1979-03-01

    The technical, economic, environmental, safety, and financial aspects of redeveloping 7 dam sites in Nebraska for hydroelectric power generation were studied. The Big Blue River Co-dependent Hydroelectric Development was found to be a technically feasible concept, for both redevelopment and in some cases rehabilitation of seven existing sites. The proposed redevelopment project will include seven installations with a recommended nominally rated redeveloped capacity of 3920 kW ranging from 120 kW at the northernmost site in Seward County to 1500 kW at Barneston. The average annual gross generation expected from the seven redeveloped sites totals 11,555,000 kWh. It is estimated that the total cost of redevelopment of these seven sites will be $14,090,000 at 1979 price levels, providing power at an average levelized cost of about 5.3 cents per kWh based on 7% cost of money, a mid-1983 commissioning date, and allowing for funds during construction and cost escalation over a 30-year period. Rehabilitation of original installations at Crete, Dewitt, Blue Springs and Barneston is technically feasible for a total installed capacity of 1415 kW with annual average gross generation of 6,675,000 kWh. The total cost of this rehabilitation is estimated as $3,372,000 at 1979 price levels, or about 2.4 cents per kWh, levelized on a similar basis. Rehabilitation of the Barneston site alone for an installed capacity of 760 kW and annual generation of 3,581,000 kWh is both technically and economically feasible. The total estimated cost of this alternative is $668,000, providing power at a cost of about 1.9 cents per kWh at 1979 price levels. The benefit-cost ratio for Barneston rehabilitation is estimated as 1.23.

  19. Turbulence at Hydroelectric Power Plants and its Potential Effects on Fish.

    Energy Technology Data Exchange (ETDEWEB)

    Cada, Glenn F.; Odeh, Mufeed

    2001-01-01

    The fundamental influence of fluid dynamics on aquatic organisms is receiving increasing attention among aquatic ecologists. For example, the importance of turbulence to ocean plankton has long been a subject of investigation (Peters and Redondo 1997). More recently, studies have begun to emerge that explicitly consider the effects of shear and turbulence on freshwater invertebrates (Statzner et al. 1988; Hart et al. 1996) and fishes (Pavlov et al. 1994, 1995). Hydraulic shear stress and turbulence are interdependent natural fluid phenomena that are important to fish, and consequently it is important to develop an understanding of how fish sense, react to, and perhaps utilize these phenomena under normal river flows. The appropriate reaction to turbulence may promote movement of migratory fish or prevent displacement of resident fish. It has been suggested that one of the adverse effects of flow regulation by hydroelectric projects is the reduction of normal turbulence, particularly in the headwaters of reservoirs, which can lead to disorientation and slowing of migration (Williams et al. 1996; Coutant et al. 1997; Coutant 1998). On the other hand, greatly elevated levels of shear and turbulence may be injurious to fish; injuries can range from removal of the mucous layer on the body surface to descaling to torn opercula, popped eyes, and decapitation (Neitzel et al. 2000a,b). Damaging levels of fluid stress can occur in a variety of circumstances in both natural and man-made environments. This paper discusses the effects of shear stress and turbulence on fish, with an emphasis on potentially damaging levels in man-made environments. It defines these phenomena, describes studies that have been conducted to understand their effects, and identifies gaps in our knowledge. In particular, this report reviews the available information on the levels of turbulence that can occur within hydroelectric power plants, and the associated biological effects. The final section

  20. Prediction of Francis Turbine Prototype Part Load Pressure and Output Power Fluctuations with Hydroelectric Model

    Science.gov (United States)

    Alligné, S.; Nicolet, C.; Béguin, A.; Landry, C.; Gomes, J.; Avellan, F.

    2017-04-01

    The prediction of pressure and output power fluctuations amplitudes on Francis turbine prototype is a challenge for hydro-equipment industry since it is subjected to guarantees to ensure smooth and reliable operation of the hydro units. The European FP7 research project Hyperbole aims to setup a methodology to transpose the pressure fluctuations induced by the cavitation vortex rope from the reduced scale model to the prototype generating units. A Francis turbine unit of 444MW with a specific speed value of ν = 0.29, is considered as case study. A SIMSEN model of the power station including electrical system, controllers, rotating train and hydraulic system with transposed draft tube excitation sources is setup. Based on this model, a frequency analysis of the hydroelectric system is performed for all technologies to analyse potential interactions between hydraulic excitation sources and electrical components. Three technologies have been compared: the classical fixed speed configuration with Synchronous Machine (SM) and the two variable speed technologies which are Doubly Fed Induction Machine (DFIM) and Full Size Frequency Converter (FSFC).

  1. Feasibility determination of hydroelectric power generation at Patillas Reservoir, Puerto Rico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Huetter, J.J. Jr.

    1979-02-01

    The overall feasibility of retrofit for hydroelectric power generation at the Patillas Reservoir, an existing impoundment located near the town of Patillas, Puerto Rico, was studied. The scope of work and project intent is limited to establishing valid acceptance or non-acceptance criteria for this specific site as an example of power generation potential at existing dams of relatively low head (less than or equal to 20 m) in the United States. Information is included on hydrologic conditions at the site, retrofit plant design, economic analysis, environmental, legal, social and institutional aspects, and availability of plant equipment. It is concluded that generation of hydropower at Patillas is entirely practical and uncomplicated from an engineering viewpoint, has no adverse environmental effects and is economically justifiable for the island of Puerto Rico. The final agency or contractor roles for development are reasonably well-established. There are no prohibitory laws or regulations concerning this development. In fact, according to Puerto Rico legislation, such hydropower developments appear to be mandated. The installed capacity of the site ranges from 665 kW to approximately 1500 kW depending on extent of development of the available options. (LCL)

  2. RECOVERY OF AN OXISOL DEGRADED BY THE CONSTRUCTION OF A HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Joseane Carina Borges de Carvalho

    2015-12-01

    Full Text Available ABSTRACT The removal of thick layers of soil under native scrubland (Cerrado on the right bank of the Paraná River in Selvíria (State of Mato Grosso do Sul, Brazil for construction of the Ilha Solteira Hydroelectric Power Plant caused environmental damage, affecting the revegetation process of the stripped soil. Over the years, various kinds of land use and management systems have been tried, and the aim of this study was to assess the effects of these attempts to restore the structural quality of the soil. The experiment was conducted considering five treatments and thirty replications. The following treatments were applied: stripped soil without anthropic intervention and total absence of plant cover; stripped soil treated with sewage sludge and planted to eucalyptus and grass a year ago; stripped soil developing natural secondary vegetation (capoeira since 1969; pastureland since 1978, replacing the native vegetation; and soil under native vegetation (Cerrado. In the 0.00-0.20 m layer, the soil was chemically characterized for each experimental treatment. A 30-point sampling grid was used to assess soil porosity and bulk density, and to assess aggregate stability in terms of mean weight diameter (MWD and geometric mean diameter (GMD. Aggregate stability was also determined using simulated rainfall. The results show that using sewage sludge incorporated with a rotary hoe improved the chemical fertility of the soil and produced more uniform soil pore size distribution. Leaving the land to develop secondary vegetation or turning it over to pastureland produced an intermediate level of structural soil quality, and these two treatments produced similar results. Stripped soil without anthropic intervention was of the lowest quality, with the lowest values for cation exchange capacity (CEC and macroporosity, as well as the highest values of soil bulk density and percentage of aggregates with diameter size <0.50 mm, corroborated by its lower

  3. Small-scale hydroelectric power in the southeast: new impetus for an old energy source

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The Southeastern conference, Small-Scale Hydroelectric Power: New Impetus for an Old Energy Source, was convened to provide a forum for state legislators and other interested persons to discuss the problems facing small-scale hydro developers, and to recommend appropriate solutions to resolve those problems. During the two-day meeting state legislators and their staffs, along with dam developers, utility and industry representatives, environmentalists and federal/state officials examined and discussed the problems impeding small-scale hydro development at the state level. Based upon the problem-oriented discussions, alternative policy options were recommended for consideration by the US Department of Energy, state legislatures and the staff of the National Conference of State Legislatures (NCSL). Emphasis was placed on the legal, institutional, environmental and economic barriers at the state level, as well as the federal delays associated with licensing small-scale hydro projects. Whereas other previously held conferences have emphasized the identification and technology of small-scale hydro as an alternative energy source, this conference stressed legislative resolution of the problems and delays in small-scale hydro licensing and development. Panel discussions and workshops are summarized. Papers on the environmental, economic, and legal aspects of small-scale hydropower development are presented. (LCL)

  4. National hydroelectric power resources study. Preliminary inventory of hydropower resources. Volume 1. Pacific Northwest region

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-07-01

    The preliminary inventory and analysis procedures provide a comprehensive assessment of the undeveloped hydroelectric power potential in the US and determines which sites merit more thorough investigation. Over 5400 existing structures have been identified as having the physical potential to add hydropower plants or increase hydropower output thereby increasing our present hydropower capacity from a total of 64,000 MW to 158,000 MW and our energy from 280,000 GWH to 503,000 GWH. While the physical potential for this increase is clearly available, some of these projects will undoubtedly not satisfy more-detailed economic analysis as well as the institutional and environmental criteria which will be imposed upon them. Summary tables include estimates of the potential capacity and energy at each site in the inventory. In some cases, individual projects may be site alternatives to others in the same general location, when only one can be considered for hydropower development. The number of sites per state is identified, but specific information is included for only the sites in Alaska, Idaho, Oregon, and Washington in this first volume.

  5. A parallel between the impacts of hydroelectric and thermoelectric power plants; Um paralelo entre os impactos das usinas hidreletricas e termoeletricas

    Energy Technology Data Exchange (ETDEWEB)

    Guerra, Sinclair M.G.; Carvalho, Antomar V. de [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica

    1995-07-01

    An evaluation of the environmental impacts of hydroelectric and thermoelectric power plants using the Leopold method is presented. The evaluation includes impacts on the physical, biological and socio-economic sectors. 8 refs., 3 figs., 2 tabs.

  6. Framework of systematic sustainability assessment strategy (FSSAS) for hydroelectric power industry in Malaysia

    Science.gov (United States)

    Johan, Kartina; Turan, Faiz Mohd

    2017-08-01

    Hydroelectric power is an alternative power resource in Malaysia and always associated with negative impact on environmental, social and economy of the surrounding site. The dispute over environmental, societal and economic issues can be minimised if compliance to sustainability development requirement is included in the project as part of the project premises during planning phase. This paper suggests a framework targeted for decision-makers in charge of implementing the projects to produce hydropower the sustainable way in Malaysian context which can mitigate the risks in social, environment and economy. The framework is strategic in nature and based on project management methodology with objective to provide a ‘common language’ by having a project value as measureable for stakeholders to state their mutual agreement of what a sustainable hydropower project in the context of Malaysia and in line with the United Nations (UN) 17 Sustainable Development Goals (SDGs). The paper discusses how the proposed systematic sustainability assessment strategy (FSSAS) framework support the call for Malaysia to promote meaningful public participation in ensuring land and natural resource decisions and to address citizens’ interests which is the core idea of Environmental Democracy Index established in 2014. The paper argues that, even though it is at present impossible to define precision status of sustainability development with respect to the nature of the multi stakeholders and the lack of systematic assessment the proposed FSSAS framework can be a valuable tool because it tracks the project value as a quantitative deliverable to determine the status of the journey in sustainable development towards accomplishing the SDG under a consensus in hydropower industry of any scale over time.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Pennsylvania, there are 3 methods by which rights in water may be acquired: riparian ownership, prescription, and condemnation. These are discussed.

  8. MODELING AND STUDY OF HYDROELECTRIC GENERATING SETS OF SMALL HYDRO POWER PLANTS WITH FREQUENCY-CONTROLLED PERMANENT MAGNET SYNCHRONOUS GENERATORS

    Directory of Open Access Journals (Sweden)

    R. I. Mustafayev

    2016-01-01

    Full Text Available Currently, the hydroelectric generating sets of small HPPs with Pelton turbines employ as their generating units conventional synchronous generators with electromagnetic excitation. To deal with the torque pulsatile behaviour, they generally install a supplementary flywheel on the system shaft that levels the pulsations. The Pelton turbine power output is adjusted by the needle changing water flow in the nozzle, whose advancement modifies the nozzle area and eventually – the flow. They limit the needle full stroke time to 20–40 sec. since quick shutting the nozzle for swift water flow reduction may result in pressure surges. For quick power adjustment so-called deflectors are employed, whose task is retraction of water jets from the Pelton turbine buckets. Thus, the mechanical method of power output regulation requires agreement between the needle stroke inside the turbine nozzles and the deflector. The paper offers employing frequency-controlled synchronous machines with permanent magnets qua generating units for the hydroelectric generating sets of small HPPs with Pelton turbines. The developed computer model reveals that this provides a higher level of adjustability towards rapid-changing loads in the grid. Furthermore, this will replace the power output mechanical control involving the valuable deflector drive and the turbine nozzle needles with electrical revolution rate and power output regulation by a frequency converter located in the generator stator circuit. Via frequency start, the controllable synchronous machine ensures stable operation of the hydroelectric generating set with negligibly small amount of water (energy carrier. Finally, in complete absence of water, the frequency-relay start facilitates shifting the generator operation to the synchronous capacitor mode, which the system operating parameter fluctograms obtained through computer modeling prove. 

  9. Feasibility determination of hydroelectric power development at the existing Sewall's Falls Dam and power facilities for the New Hampshire Water Resources Board

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    The feasibility of restoring the hydroelectric power generating capacity of the Sewall's Falls facility near Concord, NH was evaluated considering technical, economic, safety and environmental factors. It was concluded that electric power can be generated at the proposed facility at a cost of $0.025 to $0.029 per kWh, and that the construction and operation of the facility is feasible. (LCL)

  10. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Neena Isaac

    management. This paper presents the drawdown flushing studies of the reservoir of a Himalayan River. Hydroelectric Project called Kotlibhel in Uttarakhand, India. For the ... The model studies show that the sedimentation problem of the reservoir can be ..... [6] Yoon Y N 1992 The state and the perspective of the direct.

  11. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... for transfer of license for the Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa. Applicants seek Commission approval to transfer the license for the Red... Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD...

  12. New social movements and political process: The politics of hydroelectric power in Switzerland

    Science.gov (United States)

    Lehmann, Luzia M.

    This dissertation analyzes the mobilization and impact of the ecology movement mobilizing against and challenging hydroelectric power plants in the Alps. It argues that the political process model is the most fruitful framework for such a study, linking a political system's structural constraints and opportunities to movement action via organizational resources. The mobilization process resulting in movement impact is conceived as an interactive process among social movements, authorities, other opponents, and potential counter movements. The case study method is then used to analyze three action campaigns launched against hydro power plants in Graubunden since the 1970s: Ilanz I and II, Greina, and Curciusa. In terms of the movement's narrow goal of preventing a plant, Ilanz I and II is a failure, Greina a success, and Curciusa ambiguous. Yet the author defines movement impact more broadly, including procedural, reactive and proactive substantive impact, and structural impact, changes in the alliance/conflict system, and social learning. Based on the evidence from the case studies, these factors affect movement outcome positively: visibility in the media and framing the debate, adjusting the target level and movement repertoire to the opportunity structure and the spatial concentration of the issue, proactivity, and organizational resources with a well developed division of labor, internal communication, and a non-partisan alliance system at all levels. There are two main conceptual contributions. First, the author analyzes the political opportunity structure at all levels of the federal polity--the national, cantonal, and communal--as well as the interplay among the levels. The fact that the cantonal and communal levels exhibit more elements of closure than the national level helps explain differences in movements' organizational resources, movement repertoire, targeting of movement action, and thus movement impact. Second, the author develops the spatial

  13. Monitoring of surge tanks in hydroelectric power plants using fuzzy control; Ueberwachung von Wasserschloessern in Wasserkraftwerken mit Fuzzy-Control

    Energy Technology Data Exchange (ETDEWEB)

    Lin, J.C.

    2000-07-01

    Surge tanks are used to reduce pressure variations caused by fluid transients in high-head hydroelectric power plants. Occasionally load increases have to be limited to prevent the surge tank from draining due to excessive demands of flow. A control concept based on fuzzy logic was developed for governing the load changes of hydroelectric power plants. In order to achieve an optimal control behaviour and simultaneously to avoid the draining of surge tanks, the speed of load increases is automatically adjusted by a fuzzy conclusion depending on the height and the gradient of the water level in the surge tank, the reservoir level and the sum of load increases. The hydroelectric power plant Achensee of Tiroler Wasserkraftwerke AG in Austria is taken as an example to demonstrate the characteristics of the control concept. In comparison with a conventional control concept, the operation of load increases using the fuzzy concept proves to be more flexible and unrestricted. (orig.) [German] Ein Wasserschloss dient zur Verminderung von Druckschwankungen im Wasserfuehrungssystem von Hochdruckanlagen. Gelegentlich muss man die Lastaufnahme so beschraenken, dass das Wasserschloss nicht durch uebermaessige Wasserentnahme leerlaeuft. Fuer die Leistungsregelung eines Wasserkraftwerks wurde ein Konzept entwickelt, das auf der Fuzzy-Control in Verbindung mit der klassischen Regelung beruht. Um ein optimales Regelverhalten zu erhalten und gleichzeitig das Leerlaufen des Wasserschlosses zu vermeiden, wird die Geschwindigkeit der Lastaufnahme in Abhaengigkeit von der Hoehenkote und dem Gradienten des Wasserschlosspegels, dem Pegel des Oberwassers und der Groesse der geforderten Lasterhoehung automatisch eingestellt. Die Untersuchung erfolgt am Beispiel des Achenseekraftwerkes der Tiroler Wasserkraftwerke AG, Oesterreich. Im Vergleich mit einer konventionellen Regelung ergibt sich mit dem Fuzzy-Konzept eine flexiblere und freizuegigere Lastaufnahme. (orig.)

  14. Legal obstacles and incentives to the development of small-scale hydroelectric power in Rhode Island

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Rhode Island, any private rights in the flowing waters of a river or stream depend upon ownership of the abutting land. It appears Rhode Island follows the reasonable use theory of riparian law. The Department of Environmental Management is the most significant administrative agency with regard to dam construction, alteration, and operation in the state of Rhode Island.

  15. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  16. Drought Impacts on Reservoir Storage and Hydro-electricity Production in Southeastern Brazil

    Science.gov (United States)

    Scanlon, B. R.; Melo, D. D.; Yin, L.; Wendland, E.

    2015-12-01

    Brazilian hydroelectric plants (HP) generate ~85% of the total electricity in the country (138 GW). More than half of the number largest reservoirs are located in the Southeast/Midwest region, where ~50% of the population (~100 million) lives. The 2014 drought raised several questions about the resilience of the water sources when several urban centers, including Brazilian's largest metropolis (São Paulo, 20 million people), had their water supply threatened. Such drought also affected reservoirs of hydroelectric plants. This study assesses how the storage and, thus the electricity generation, in 14 of the largest reservoirs were affected by drought events within the past 20 years. We computed the Standardized Precipitation Index (SPI) to identify rainfall anomalies throughout the analyzed period. To evaluate the impacts on surface water, we assessed the changes in total (surface+ subsurface) runoff and soil moisture from Global Land Data Assimilation System (GLDAS) and in Total Water Storage (TWS) from Gravity Recovery and Climate Experiment (GRACE) satellite data. We evaluated the anomalies and significance of the changes in reservoir storage (RS) and electricity generation. The results show that severe dry years (-1.5 < SPI <-2.0) reduce reservoir storage (RS) by up to ~60% of its total capacity. Both electricity generation and reservoir storage showed strong negative trends between 2011 and 2014. Our results also indicate that within the past 20 years, two major depletions in reservoir storage occurred: 2001 and 2014. However, due to lower soil moisture in 2013 compared to that in 2000, distinct impacts were observed on the reservoirs with much stronger impacts on reservoir storage in 2014 relative to those in 2001. No meaningful changes in runoff were shown by GLDAS during the 2014 drought. The observed depletion in the RS in 2014 was similar to that in the TWS, as shown by GRACE data. In 2014, the electricity production by the HP declined by ~20%. As a

  17. Erosion Control and Recultivation Measures at a Headrace Channel of a Hydroelectric Power Plant using Different Combined Soil Bioengineering Techniques

    Science.gov (United States)

    Obriejetan, M.; Florineth, F.; Rauch, H. P.

    2012-04-01

    vegetation properties are studied by setting up comparative test plots at a field study site located at a headrace channel of a hydroelectric power plant. Different vegetational parameters such as basal coverage, species richness, species composition, abundance/dominance values by using a refined Braun-Blanquet cover estimation scale were collected as well as local environmental properties. Results during the first vegetation period show distinct effects of geotextiles especially on overall vegetation coverage and grasses-herbs-ratio. Geotextile supported plots show 20% higher overall coverage but lower amount of herbs after three months of vegetation growth compared to control plots without installation of auxiliary materials. Furthermore coir blankets reveal higher penetration resistance for seed leaves of herbal plants compared to coir nettings. Hence technical erosion protection products, biological components and it's combination have to be closely coordinated in order to achieve specified revegetation objectives and meet long-term functionality.

  18. Development of a 1 D hydrodynamic habitat model for the Hippopotamus amphibious as basis for sustainable exploitation of hydroelectric power

    Science.gov (United States)

    Manful, D. Y.; Kaule, G.; Wieprecht, S.; Rees, J.; Hu, W.

    2009-12-01

    Hydroelectric Power (HEP) is proving to be a good alternative to carbon based energy. In the past hydropower especially large scale hydro attracted significant criticism as a result of its impact on the environment. A new breed of hydroelectric dam is in the offing. The aim is to have as little a footprint as possible on the environment in both pre and post construction phases and thus minimize impact on biodiversity whilst producing clean renewable energy. The Bui dam is 400 MW scheme currently under development on the Black Volta River in the Bui national park in Ghana. The reservoir created by the Bui barrage is expected to impact (through inundation) the habitat of two species of hippos know to exist in the park, the Hippopotamus amphibius and the Choeropsis liberiensis. Computer-based models present a unique opportunity to assess quantitatively the impact of the new reservoir on the habitat of the target species in this case the H. amphibious. Until this undertaking, there were very few studies documenting the habitat of the H. amphibious let alone model it. The work and subsequent presentation will show the development of a habitat model for the Hippopotamus amphibius. The Habitat Information retrieval Program based on Streamflow Analysis, in short HIPStrA, is a one dimensional (1D) in-stream, spatially explicit hybrid construct that combines physico-chemical evidence and expert knowledge to forecast river habitat suitability (Hs) for the Hippopotamus amphibius. The version of the model presented is specifically developed to assess the impact of a reservoir created by a hydroelectric dam on potential dwelling areas in the Bui gorge for hippos. Accordingly, this version of HIPStrA simulates a special reservoir suitability index (Rsi), a metric that captures the”hippo friendliness” of any lake or reservoir. The impact of measured and simulated flood events as well as low flows, representing extreme events is also assessed. Recommendations are made for the

  19. Feasibility of determination of low-head hydroelectric power development at existing sites: North Hartland Dam Project. Feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The feasibility of constructing a low-head hydroelectric power plant at the North Hartland Dam in Vermont was investigated. Evaluation of technical, economic, environmental, safety, and regulatory aspects led to the conclusion that the North Hartland Dam Hydroelectric Project is a technically feasible concept. The proposed project will have a recommended 6000 kW nominally rated capacity at a 52 ft turbine design head and 1680 cfs demand flow. The gross generation expected from the project is 11,980,000 kWh per year. It is estimated that the project will cost $8,997,000 at 1978 price levels, with no allowance for funds during construction. The project will provide peaking power at a levelized cost of about 41 mills per kWh at 1979 price levels, based on 7% cost of money, a 1985 commissioning date, and allowing for funds during construction and cost escalation over a 30 y period. The benefit-cost ratio compared with an equivalent oil-based generation source over a similar period is estimated as 1.06. (LCL)

  20. Probabilistic streamflow forecasting for hydroelectricity production: A comparison of two non-parametric system identification algorithms

    Science.gov (United States)

    Pande, Saket; Sharma, Ashish

    2014-05-01

    This study is motivated by the need to robustly specify, identify, and forecast runoff generation processes for hydroelectricity production. It atleast requires the identification of significant predictors of runoff generation and the influence of each such significant predictor on runoff response. To this end, we compare two non-parametric algorithms of predictor subset selection. One is based on information theory that assesses predictor significance (and hence selection) based on Partial Information (PI) rationale of Sharma and Mehrotra (2014). The other algorithm is based on a frequentist approach that uses bounds on probability of error concept of Pande (2005), assesses all possible predictor subsets on-the-go and converges to a predictor subset in an computationally efficient manner. Both the algorithms approximate the underlying system by locally constant functions and select predictor subsets corresponding to these functions. The performance of the two algorithms is compared on a set of synthetic case studies as well as a real world case study of inflow forecasting. References: Sharma, A., and R. Mehrotra (2014), An information theoretic alternative to model a natural system using observational information alone, Water Resources Research, 49, doi:10.1002/2013WR013845. Pande, S. (2005), Generalized local learning in water resource management, PhD dissertation, Utah State University, UT-USA, 148p.

  1. Legal obstacles and incentives to the development of small scale hydroelectric power in Delaware

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are discussed. The Federal government also exercises extensive regulatory authority in the area, and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. In Delaware, a watercourse is not to be confused with surface water. Each gives rise to certain riparian rights, but the law makes certain distinctions between the two. The presence of both surface waters and watercourses give rise to private and public rights related to the presence of the water. Some of these rights are vested in riparian owners. Recent Delaware case law has described the riparian owner as one who owns land on the bank of a river, or who is owner of land along, bordering upon, bounded by, fronting upon, abutting, or adjacent and contiguous to and in contact with a river. But, ownership of the bank does not give the riparian ownership of the water. Some law cases are cited to discuss the laws in Delaware.

  2. Legal obstacles and incentives to the development of small scale hydroelectric power in Maryland

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maryland are described. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined with the aim of creating a more orderly understanding of the vagaries of the system, focusing on the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC. In Maryland, by common law rule, title to all navigable waters and to the soil below the high-water mark of those waters is vested in the state as successor to the Lord Proprietary who had received it by grant from the Crown. Rights to non-navigable water, public trust doctrine, and eminent domain are also discussed. Direct and indirect regulations, continuing obligations, loan programs, and regional organizations are described in additional sections.

  3. Legal obstacles and incentives to the development of small scale hydroelectric power in New Hampshire

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are described. The Federal government also exercises extensive regulatory authority in the area and the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and an inquiry into the practical use of the doctrine by the FERC is examined. The first step any developer must take is that of acquiring the real estate parcel. The step involves acquisition in some manner of both river banks, the river bed, and where necessary the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important for only a use of water by a riparian owner is deemed a reasonable use and hence legal. Apart from acquisition by sale, lease, or gift, New Hampshire law permits a number of other methods. In part use of these methods will depend on whether the developer is the state, a municipality, a private corporation, or a public utility. Provided the developer avails himself of the five (5) megawatts exemption, his main regulatory agency will be the Water Resources Board. However, the state is not free from the problems of legal uncertainty inherent in determinations of reasonableness.

  4. Legal obstacles and incentives to the development of small-scale hydroelectric power in Virginia

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy in Virginia are described. The state regulatory system does not comprise final authority; the Federal government also exercises extensive regulatory authority in the area. This dual system is a function of the federalist nature of our government. The introductory section examines the dual system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and inquires into the practical use of the doctrine by the FERC. The use of a natural-surface watercourse in Virginia is governed generally by the doctrine of riparian rights. Riparian rights is a system of water rights based on ownership of land bordering on a natural stream or watercourse. For land to be considered riparian to a stream, that land must be located on the watershed of that portion of the stream. The theory of riparian rights followed in Virginia is one of reasonable use. Under the reasonable-use doctrine, each riparian owner has an equal right to the reasonable use of the water running naturally through or by his land for any useful purpose. The water must continue to run after such use without material diminution or alteration and without pollution.

  5. Evaluation for turbine implementation for a micro hydroelectric power plant; Avaliacao para implantacao de uma turbina para uma microcentral hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Gilberto Manoel; Halmeman, Maria Cristina Rodrigues; Oliveira, Franciene Gois [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Programa de Pos-graduacao em Energia na Agricultura; Seraphim, Odivaldo Jose [Universidade Estadual Paulista (UNESP), Botucatu, SP (Brazil). Dep. de Engenharia Rural

    2008-07-01

    In this work it was analyzed the viability technical and economical of turbines to micro hydroelectric headquarters as an alternative to consumers not served by electric energy in isolated areas. It was used a experimental methods to create an estimative and a evaluation of the hydroelectric potential, through hydrological criteria in the area and, thus, be able to note if there is viability for its use. Some kinds of turbines made by the national industry were verified, analyzing the technical and economical characteristics and in function of the hydro energetic-conditions of the area. The results shoed that a micro-headquarters serves the necessities and expectations of the owner at the electric energy supply. It was noted that the expenses are smaller comparing to the other expenses know in the literature, from national factories. Even though the limiting factor is the distance from the production to the consumer, the potency of 18.4 kw was enough to satisfy the local necessities. The installation of de micro headquarters will bring enhances and facilities by the fact that it represents a big social importance for the area. (author)

  6. The impacts of wind power integration on sub-daily variation in river flows downstream of hydroelectric dams.

    Science.gov (United States)

    Kern, Jordan D; Patino-Echeverri, Dalia; Characklis, Gregory W

    2014-08-19

    Due to their operational flexibility, hydroelectric dams are ideal candidates to compensate for the intermittency and unpredictability of wind energy production. However, more coordinated use of wind and hydropower resources may exacerbate the impacts dams have on downstream environmental flows, that is, the timing and magnitude of water flows needed to sustain river ecosystems. In this paper, we examine the effects of increased (i.e., 5%, 15%, and 25%) wind market penetration on prices for electricity and reserves, and assess the potential for altered price dynamics to disrupt reservoir release schedules at a hydroelectric dam and cause more variable and unpredictable hourly flow patterns (measured in terms of the Richards-Baker Flashiness (RBF) index). Results show that the greatest potential for wind energy to impact downstream flows occurs at high (∼25%) wind market penetration, when the dam sells more reserves in order to exploit spikes in real-time electricity prices caused by negative wind forecast errors. Nonetheless, compared to the initial impacts of dam construction (and the dam's subsequent operation as a peaking resource under baseline conditions) the marginal effects of any increased wind market penetration on downstream flows are found to be relatively minor.

  7. Legal obstacles and incentives to the development of small scale hydroelectric power in Vermont

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Vermont are discussed. The dual regulatory system involving state and Federal governments is discussed followed by discussions on property interests; direct regulation by the Public Service Board; indirect regulation; and financial considerations. An initial step required of any developer is that of real property acquisition. Ordinarily this involves acquiring the stream bed, land along the stream banks, and land needed for the impoundment reservoir. Ownership of land along the stream banks places the developer in the position of a riparian owner. This status is important in that only riparian owners are entitled to a reasonable use of the flowing water. In addition to acquisition by sale, lease, or gift, Vermont law allows certain developers to acquire property via eminent domain. Some general rules which have evolved as riparian law and applied in Vermont are discussed.

  8. The portfolio theory applied to small hydroelectric power plants; Teoria do portfolio aplicada a pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Bastos, Paulo Roberto Ferreira de Moura

    2002-07-01

    The 'Portfolio Theory' has been largely employed on stock markets, aiming to improve the relation between risk and return. This theory identifies many possible investment combinations once it's associated with the idea that increasing investment diversification can lower risk. The objective is, thus identify the portfolio that offers the most efficient diversification of capital. The reforms on the energy sector in Brazil have made investments on both generation and commercialization of electric energy easier for medium sized investors. There have been economic incentives to the exploration of wind and bio-mass energy, and to the construction of small hydro-electric power plants (in Portuguese, PCH), as well as many legal and regulatory mechanisms pursuing the maintenance of elevate rates of participation of renewable source in the production of electrical energy in Brazil. Between these options, the PCH are a specially good opportunity taking account of its minimum environment impact, low operational costs and total technologic control. The decision concerning investment options has been based on standard economic analysis like 'Net Present Value', 'Payback Time' or 'Cost/Benefit Relations'. Other techniques such as scenario and sensitivity have been incorporated and, more recently, there has been a search for other methods consider the uncertainty of happenings within the horizon of study. This dissertation will analyse six possibilities of PCH with standard techniques. Of them, the four possibilities considered viable will constitute our examples for the application of Portfolio Theory techniques. Once the active portfolio is determined, the best option is identified using the 'mean-variance efficient' developed by Markowitz, concluding that the theory can give better support to the decision-making in future enterprises on the electric sector. After considering the optimal return/risk combinations, there was

  9. Assessment of power step performances of variable speed pump-turbine unit by means of hydro-electrical system simulation

    Science.gov (United States)

    Béguin, A.; Nicolet, C.; Hell, J.; Moreira, C.

    2017-04-01

    The paper explores the improvement in ancillary services that variable speed technologies can provide for the case of an existing pumped storage power plant of 2x210 MVA which conversion from fixed speed to variable speed is investigated with a focus on the power step performances of the units. First two motor-generator variable speed technologies are introduced, namely the Doubly Fed Induction Machine (DFIM) and the Full Scale Frequency Converter (FSFC). Then a detailed numerical simulation model of the investigated power plant used to simulate power steps response and comprising the waterways, the pump-turbine unit, the motor-generator, the grid connection and the control systems is presented. Hydroelectric system time domain simulations are performed in order to determine the shortest response time achievable, taking into account the constraints from the maximum penstock pressure and from the rotational speed limits. It is shown that the maximum instantaneous power step response up and down depends on the hydro-mechanical characteristics of the pump-turbine unit and of the motor-generator speed limits. As a results, for the investigated test case, the FSFC solution offer the best power step response performances.

  10. Potential Hydroelectric Power Upriver Dam: City of Spokane Department of Utilities Water Division

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The technical, economic, environmental and institutional feasibility of increasing the power generation capacity of the City of Spokane's Upriver Dam Complex by installing additional generating facilities and/or modifying existing facilities were studied. It is proposed that the existing powerhouse be uprated from 3.9 to 4.5 MW and that a new powerhouse be constructed with two 4.5 MW turbines to provide an annual additional energy production of 62.3 million kWh. No adverse environmental or safety effects are foreseen, the socio-institutional impacts will be beneficial, there is a market for the power produced, and the benefit/cost ratio is advantageous. (LCL)

  11. The effects of run-of-river hydroelectric power schemes on invertebrate community composition in temperate streams and rivers.

    Science.gov (United States)

    Bilotta, Gary S; Burnside, Niall G; Turley, Matthew D; Gray, Jeremy C; Orr, Harriet G

    2017-01-01

    Run-of-river (ROR) hydroelectric power (HEP) schemes are often presumed to be less ecologically damaging than large-scale storage HEP schemes. However, there is currently limited scientific evidence on their ecological impact. The aim of this article is to investigate the effects of ROR HEP schemes on communities of invertebrates in temperate streams and rivers, using a multi-site Before-After, Control-Impact (BACI) study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 22 systematically-selected ROR HEP schemes and 22 systematically-selected paired control sites. Five widely-used family-level invertebrate metrics (richness, evenness, LIFE, E-PSI, WHPT) were analysed using a linear mixed effects model. The analyses showed that there was a statistically significant effect (pstudy design for future invertebrate community impact studies.

  12. THE SIGNIFICANCE OF STRUCTURAL AND GEOLOGICAL RELATIONSHIP ASSESSMENT IN THE CONSTRUCTION OF THE OMBLA UNDERGROUND HYDROELECTRIC POWER PLANT

    Directory of Open Access Journals (Sweden)

    Renato Buljan

    1997-12-01

    Full Text Available The construction design of the underground hydroelectric plant Ombla required geological and structural investigations to he carried out. Due to past earthquakes in the area permanent tectonic movements were inferred. Therefore, in the wider and adjacent surroundings of the Ombla spring it was necessary to analyze the structural fabric and the geodynamic characteristics of the area. The most active zone encountered is the front part of a thrust fault belonging to the Dinaricum regional structural unit. The compressive regime is maintained as a response to the regional stress of an approximately S-N orientation. Different displacements of various parts of the Dinaricum unit are present. Along the rim of the structural blocks, the Hum-Om-bla fault zone extends, accompanied by left transcurrent faults, Through this zone the main groundwater drainage occurs supplying the Ombla spring. In the local Ombla spring area this zone is characterized by three sub-blocks and three major faults. The most important fault for the vital facilities of the Ombla hydroelectric power plant is the Pločice fault which divides the structural sub-blocks. Along this fault zone there are four mutually connected. The lowest two arc active groundwater draining systems supplying the Ombla spring. The data on local stress implies the following deformation of sub-blocks: sub-blocks 2c and 2f are displaced along normal faults from 20° to 30° to the left, downwards, while the sub-block 2 d is displaced along the Pločice thrust fault of 100° to 130° to the left, upwards. The structural data confirmed that the building of an underground dam with a height from 100 to 130 m was feasible. The connection between the caverns and the fault zone was determined. The unfavorable position of the active Pločice fault zone imposes the construction of vital Ombla power plant facilities underground.

  13. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power of the Boardman River at Traverse City, Michigan

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    An analytic description of one decision-making process concerning whether or not to develop the hydroelectric potential of the Boardman River is presented. The focus of the analysis is on the factor that the developers considered, or should consider in making a responsible commitment to small-scale hydroelectric development. Development of the Boardman River would occur at the five dam sites. Two existing dams, owned by the county, previously generated hydroelectricity, as did a third before being washed out. One dam has never been utilized. It is owned by the city which also owns the washed-out area. The study concludes that hydroelectric power is feasible at each. Grand Traverse County and Traverse City would engage in a joint venture in developing the resource. Chapter I presents a detailed description of the developers, the river resource, and the contemplated development. Chapter II is an analysis of the factors affecting the decision making process. Chapter III summarizes the impact of the more significant barriers and incentives and presents recommendations that, if implemented, will favorably affect decisions to develop small-scale hydroelectric generation capability.

  14. Model for analysis and definition of the governor constants in hydroelectric power; Modelo para analise e definicao das constantes do regulador em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Andrade, Jose Geraldo Pena de; Koelle, Edmundo; Luvizotto Junior, Edevar [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Civil. Dept. de Hidraulica e Saneamento

    1997-07-01

    This paper presents a complete mathematical and computer model which allows simulating a generic hydroelectric power plant under steady state and transitory regimes, in the extensive time, and also the analysis of the oscillating flows resulting from excitation sources present in the installation, such as vortices in the suction pipe during partial load operation.

  15. Rescue and preservation of Serra da Mesa hydroelectric power plant flora; Salvamento e conservacao da flora de UHE Serra da Mesa

    Energy Technology Data Exchange (ETDEWEB)

    Santos, H.G.P.; Silva, S.P.C. da [FURNAS, Rio de Janeiro, RJ (Brazil); Walter, B.M.T. [Empresa Brasileira de Pesquisa Agropecuaria, (Brazil). CENARGEN

    1993-12-31

    This report shows what is being doing to rescue and preserve the flora affected by the construction of the Serra da Mesa hydroelectric power plant. A survey concerning the existent flora on the area influenced by the undertaking is proceeded and the first results of such survey are here presented 5 refs., 2 tabs.

  16. Flood Frequency Analysis Under Non-stationarity Conditions: the Case of Southern Brazilian Hydroelectric Power Plants

    Science.gov (United States)

    Bartiko, Daniel; Chaffe, Pedro; Bonumá, Nadia

    2017-04-01

    Floods may be strongly affected by climate, land-use, land-cover and water infrastructure changes. However, it is common to model this process as stationary. This approach has been questioned, especially when it involves estimate of the frequency and magnitude of extreme events for designing and maintaining hydraulic structures, as those responsible for flood control and dams safety. Brazil is the third largest producer of hydroelectricity in the world and many of the country's dams are located in the Southern Region. So, it seems appropriate to investigate the presence of non-stationarity in the affluence in these plants. In our study, we used historical flood data from the Brazilian National Grid Operator (ONS) to explore trends in annual maxima in river flow of the 38 main rivers flowing to Southern Brazilian reservoirs (records range from 43 to 84 years). In the analysis, we assumed a two-parameter log-normal distribution a linear regression model was applied in order to allow for the mean to vary with time. We computed recurrence reduction factors to characterize changes in the return period of an initially estimated 100 year-flood by a log-normal stationary model. To evaluate whether or not a particular site exhibits positive trend, we only considered data series with linear regression slope coefficients that exhibit significance levels (pStudent's test. The trend model residuals were analyzed using the Anderson-Darling normality test, the Durbin-Watson test for the independence and the Breusch-Pagan test for heteroscedasticity. Our results showed that 22 of the 38 data series analyzed have a significant positive trend. The trends were mainly in three large basins: Iguazu, Uruguay and Paranapanema, which suffered changes in land use and flow regularization in the last years. The calculated return period for the series that presented positive trend varied from 50 to 77 years for a 100 year-flood estimated by stationary model when considering a planning horizon

  17. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power. Executive summary

    Energy Technology Data Exchange (ETDEWEB)

    Schwartz, Larry; Wilson, William

    1979-11-01

    This Executive Summary presents observations, conclusions, and recommendations developed from the completion of five (5) case studies of hydroelectric sites at High Falls, Georgia; Traverse City, Michigan; Swanville Lake, Maine; Cornell, Wisconsin; and Maxwell Locks, Pennsylvania. The work was accomplished by the Energy Law Institute of the Franklin Pierce Law Center, Concord, NH, for the National Conference of State Legislatures. The material contained here is, in part, a summary of the five separate reports on the legal and institutional barriers and incentives bearing on the development of each site. It is also a summary of the cumulative impressions of the actual general legal and institutional climate for small-scale hydroelectric development represented by the issues confronting each site. This document provides a general analysis and overview of the significant problems and opportunities for the development of hydroelectric facilities identified in the five full reports. A second Executive Summary is presented on the findings of two case studies of small-scale hydroelectric power at existing dams. The projects reviewed are: six sites in the irrigation system known as the Columbia Basin Project and two sites in the Bull Run watershed which supplies water to the City of Portland, Oregon. Key incentives and impediments are identified in these case studies conducted at the University of Washington.

  18. 76 FR 58837 - Notice of Intent to Accept Proposals, Select Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-09-22

    ... Western's potential marketing of hydropower. FOR FURTHER INFORMATION CONTACT: Technical data may be... marketing of the power may be obtained by contacting Ms. LaVerne Kyriss, CRSP Manager, Western Area Power... management personnel, history of any reorganizations or mergers with other companies, and any other...

  19. Soil erosion and sediment delivery issues in a large hydro-electric power reservoir catchment, Ethiopia

    Science.gov (United States)

    Nebiyu, Amsalu; Dume, Bayu; Bode, Samuel; Ram, Hari; Boeckx, Pascal

    2017-04-01

    Land degradation and associated processes such as gullying, flooding and sedimentation, are among the developmental challenges in many countries and HEP reservoirs in the Gilgel Gibe catchment, Ethiopia, are under threat from siltation. Soil erosion is one of the biggest global environmental problems resulting in both on-site and offsite effects which have economic implications and an essential actor in assessing ecosystem health and function. Sediment supply in a catchment is heterogeneous in time and space depending on climate, land use and a number of landscape characteristics such as slope, topography, soil type, vegetation and drainage conditions. In the Ethiopian highlands, sediment delivery depends on discharge, the onset of rainfall, land use and land cover, which varies between rainfall seasons. There is also a variation among catchments in suspended sediment concentration due to the variation in the catchments characteristics in Ethiopia. Rainfall-runoff relationship, sediment production and delivery to rivers or dams is variable and poorly understood; due to heterogeneous lithology; various climatic conditions across small spatial scales; land use and land management practices in Ethiopia. Spatial variation in sediment yield in Africa varies to differences in seismic activity, topography, vegetation cover and annual runoff depth. In the Gilgel-Gibe catchment, the annual sediment load of the Gilgel-Gibe River has been estimated to be about 4.5×107 tons taking the contribution of sheet erosion alone. Also, the suspended sediment yield of the tributaries in Gilgel-Gibe catchment has been estimated to be in the range of 0.4-132.1 tons per hectare per year. The soil loss due to landslide alone in the past 20 years in the catchment was about 11 t/ha/yr. Heavy rainfall, bank erosion and river incisions have been indicated as the main triggering factors for landslides and the associated sediment delivery in the Gilgel-Gibe catchment. Approaches for catchment

  20. Sediment management of run-of-river hydroelectric power project in ...

    Indian Academy of Sciences (India)

    Author Affiliations. NEENA ISAAC1 2 T I ELDHO1. Department of Civil Engineering, Indian Institute of Technology Bombay, Mumbai 400076, India; Central Water and Power Research Station, Khadakwasla, Pune 411024, India ...

  1. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  2. Construction and environmental aspects of hydroelectric power stations; Bauliche Gestaltung und Umweltaspekte von Wasserkraftanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Giesecke, J. [Stuttgart Univ. (Germany). Inst. fuer Wasserbau

    1997-12-31

    In terms of environmental-friendliness, inexhaustibility, availability, non-pollution and cost conditions, hydro power is the most obvious renewable energy source. Harnessing of hydro power does interfere with nature. But there are ways of reconciling economic and ecological concerns. (orig.) [Deutsch] Im Hinblick auf Umweltfreundlichkeit, Unerschoepflichkeit, Verfuegbarkeit, Schadstofffreiheit und Kostenlage stellt die Wasserkraft die vorrangige erneuerbare Energiequelle dar. Ihre Nutzung fuehrt zu Eingriffen in die Natur. Es gibt jedoch Wege, die Belange der Oekonomie und der Oekologie ausgewogen aufeinander abzustimmen. (orig.)

  3. Cost basis for hydroelectric power plants. Price level of 01.01.1995; Kostnadsgrunnlag for vannkraftanlegg. Prisnivaa pr 01.01.1995

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, H.; Slapgaard, J.

    1995-08-01

    This publication provides a basis for calculation of expected average construction costs and equipment costs for large hydroelectric power plants in Norway. The publication is not intended to be a tool for projecting with regard to optimization or choice of construction types, but should be useful at an early stage of planning. There is a supplementary publication (Publication no. 20/1995) for small plants. 80 figs., 12 tabs.

  4. Integrated environmental action plan for Furnas hydroelectric power plant reservoir and adjacent cities; Plano de acao ambiental integrada do reservatorio da Usina de Furnas e municipios lindeiros

    Energy Technology Data Exchange (ETDEWEB)

    Taam, Mauricio; Barbosa, Jose Roberto; Costa, Vivaldi Goncalves; Vieira, Jose Henrique; Fonseca, Joao Bosco R.; Dinelli, Ricardo [FURNAS Centrais Eletricas S.A., Rio de Janeiro, RJ (Brazil)

    1995-12-31

    This work concerns the integrated environmental action plan - Furnas project, which represents a new philosophy for dealing with environmental issues concerning undertakings in operation. The area of influence of the Furnas hydroelectric power plant reservoir is described and the consequences of the urban and agricultural accelerated growth considering environmental aspects are discussed. Solutions pointing at reforestation and recuperation of eroding areas are suggested 3 refs., 2 figs., 1 tab.

  5. Diversion at small hydro-electric power stations; Forbislipping ved smaa vannkraftverk

    Energy Technology Data Exchange (ETDEWEB)

    Noren, Knut E.; Elstad, Ivar K.

    2008-07-01

    At a shut down caused by, for instance, a power shortage at a power station, the electric aggregate will stop and there will be a quick change in the flow of water downstream of the power station. This situation gives undesirable environmental effects, especially with regards to fish. The fish must have the opportunity to withdraw to deep pools, to avoid running aground. The goal of this report is to present good ideas to design diversion stations that reduce the environmental effects to an acceptable level, which is especially important in anadromous waterways, simultaneously not costing too much. The demand for diversion should be clarified with the authorities as soon as possible. By taking into account the power stations dimensions and foundation needs early on in the planning phase, the cost will be minimized. As a rule NVE currently demand that a diversion installation must have a capacity of 50 % of the turbines full flow of water. This is to avoid large changes in the flow of water downstream of the power station. In addition to the demand on the maximum capacity of the diversion installation, there should also be posed a demand that the calculation of the rate of flow should be kept within 50 % of the total rate of flow before the shut down. This is possible to achieve with the help of software control without the operational drawbacks caused by slow regulation being too great. Calculations carried out show that also with loading operation after shut down should have a relatively slow rate of flow. It is recommended that the short term rate of flow increase should be no more than 50 % of the rate of flow before the shut down or the stationary rate of flow before the turbines are started. To ensure the diversion with loading operation at small power stations it is recommended to use standard valves as much as possible, possibly with an energy dissipater that often can be manufactured locally. The installation should be arranged in such a way that the

  6. Vulnerability of the hydro-electric power plants to the impacts of ...

    African Journals Online (AJOL)

    ... sector to the impacts of climate change in Rwanda – a small country in Central Africa. At the community level, the field level intervention being implemented aims at improving management of the watersheds supporting the power stations and would eventually contribute to supporting the communities in poverty alleviation.

  7. Estimation of small-scale hydroelectric power plant costs; Estimacao de custos de PCH

    Energy Technology Data Exchange (ETDEWEB)

    Santos, Afonso Henriques Moreira [MS Consultoria Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Silva, Benedito Claudio da [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil); Universidade Federal de Itajuba (UNIFEI), MG (Brazil); Magalhaes, Ricardo Nogueira [IX Consultoria e Representacoes Ltda, Itajuba, MG (Brazil)

    2010-07-01

    Changes in Brazilian energy scenario through last years such as increase of demand and search for clean and economically feasible renewable energy sources, has stimulated investors to small hydro power plants (SHP) sector. Such characteristics together with several economic incentives, legal and regulatory mechanisms also, have helped and stimulated building of new plants of this kind and have attracted a great number of investors to this sector. Study of costs analysis and feasibility of investments is a study which has been used since long time in SHP business market as several preliminary studies previous to civil project have significant costs which lead us to count with a feasibility analysis from the very beginning of studies, exactly what is suggested in the present methodology. Such feasibility analysis, in the common patterns where basic unit costs of each input remain outstanding, would be very complex due to great difficulty in obtaining information at initial phase of project. In this direction this study brings a contribution for investors as well as for designers of small hydro power plants since it outlines a link between physical and energetic characteristics of small hydro power plant in its total cost. Such link is based in available physical characteristics in initial phase of the project, making possible a previous comparison between arrangements of a central or even the comparison of return of investment between different plants. The resulting benefit being the possibility of choosing centrals with greater economic feasibility disregarding bad undertakings or arrangements with more expressive cost. Final result gives a better delay in return of investment, helps in power, arrangements more optimized and in saving time as well, reducing costs of undertakings. Due to large number of SHP arrangements, we chose for this study the most common in Brazil, plant of medium and large fall, shunting line balance chimney and low pressure conduit. (author)

  8. Hydroelectric power - energy at no cost at all; Wasserkraft - Strom, der vom Himmel faellt

    Energy Technology Data Exchange (ETDEWEB)

    Goede, E. [Stuttgart Univ. (Germany). Inst. fuer Stroemungsmechanik und Hydraulische Stroemungsmaschinen

    1997-12-31

    The harnessing and enhanced use of renewable energy today is a matter of lively debate and much concern. Amazingly, hydro power is either rarely considered in these discussions or viewed in a negative light. But hydro power continues to be the most important source of renewable energy, and its use potential is considerable and should be taken into account when, for instance, agreeing on or implementing carbon dioxide reduction targets. Small hydro power stations are an effective means of harnessing existing energy potentials. (orig.) [Deutsch] Ueber die Nutzung und den Ausbau regenerativer Energien wird heutzutage lebhaft diskutiert und gerungen. Es mag erstaunen, dass in diesen Diskussionen die Wasserkraft kaum Beachtung findet oder in einem schlechten Licht gesehen wird. Dabei ist die Wasserkraft nach wie vor bei weitem die wichtigsten Quelle regenerativer Energie, und sie besitzt ein beachtliches Ausbaupotential, das man wenigstens ins Kalkuel ziehen sollte, wenn es etwa darum geht, CO{sub 2}-Minderungsziele zu vereinbaren bzw. anzustreben. Die Kleinwasserkraft kann hier als Chance gesehen werden, noch vorhandene Energiepotentiale sinnvoll zu nutzen. (orig.)

  9. Multidisciplinary studies on hydric, energetic and environmental resources, evaluating the hydroelectric plants energy surplus as alternative for hydrogen production; Estudos multidisciplinares na area de recursos hidricos, energeticos e ambientais, avaliando-se o uso de energia excedente de hidreletricas como alternativa para producao de hidrogenio

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto; Naturesa, Jim Silva; Santos Junior, Joubert Rodrigues; Demanboro, Antonio Carlos [Universidade Estadual de Campinas (UNICAMP), SP (Brazil). Faculdade de Engenharia Civil. Grupo de Planejamento Energetico e Sistemas Eletricos]. E-mails: cam@fec.unicamp.br; jimnaturesa@yahoo.com; joubert.dos@terra.com.br; anto1810@fec.unicamp.br

    2006-07-01

    The researchers on energy, hydraulic and environmental subjects have been discussing the perspective and both the technical and economic viability of using the exceeding energy of hydroelectric power plants to produce hydrogen, taking into consideration the resources optimizations and the maximization of the economic gains. The researches and technicians of the Brazilian energy sector have considered, the increasing possibility of using of exceeding energy from hydroelectric power plants to produce hydrogen, mainly for the special case of the bi-national hydroelectric of Itaipu. Nevertheless it is important to present a discussion about the use and the production of hydrogen in Brazilian context considering, mainly, the consolidated experience of certain research centers and national laboratories. The paper also presents a discussions about the main technical characteristics, the electro electronic devices used and a brief discussion about the possibility of electric energy expansion, through the use of FACTS devices, for the southeast region of the country having the hydrogen as an important fuel. (author)

  10. National Hydroelectric Power Resources Study:Regional Assessment: Volume XXIII: Alaska and Hawaii

    Science.gov (United States)

    1981-09-01

    expenditures, and agriculture. The bulk of agricultural activity is in the production of sugar and pineapple . The most rapid growth in the past...2 • ~~UI TR-KALUA PEEL . 151 • • STATE OF HAWAII ULN~ • • * • * • " * * 9.2 * 3.0 • 2 * • * IS UP * HIKPOH0027 " PAIA * 5 • MAUl

  11. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution networks, management and maintenance of the MHPPs. Data were collected using questionnaires, direct interviews and site observations and ...

  12. Feasibility determination of low-head hydroelectric power development at existing sites. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Polonsky, R.

    1979-01-01

    This report contains the feasibility study, economic analysis, and information relevant to reactivation of the dam in Bethelehem, NH. It outlines a plan of development which calls for sale of the power to a local utility for the first few years of the project and then predominately on-site use of the power in an innovative plan for controlled-environment agriculture. The economic analyses indicate that reactivation of the dam would be a successful venture based on the present market value of 4.5 cents/kWh. The success of the second phase in the dam's use rests on the increasing financial attractiveness of locally grown produce in a state that currently imports over 90% of its food and is experiencing the spiraling costs of food, energy, and inflation. The best-suited turbine package for the site is an Ossberger 750-kW unit which would provide 4,014,000 kWh per year with a plant factor of 61%. The total capital costs of the project are $827,935.

  13. Standardization of electric projects of small hydroelectric power plants; Padronizacao de projetos eletricos de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Roberth dos Santos

    2002-07-01

    This work presents a standardizing proposal for Electrical Projects of small hydroelectric central and it has as objective to optimize some solutions for the most cases, considering the great diversity of options. The development of the dissertation is the result of several real cases of projects of hydroelectric centrals. Besides the projects, several bibliographies about the case which is being studied were researched, taking into consideration the entire proposal presented to the respective authors and, finally, as synthesis to all observations made in that study, the presentation of an optimized solution for the job of the electrical components and a proposal for the estimate of costs of those components. The conclusions of this work present a favorable result because they offer an initial proposal for the standardizing of information considered extremely important for the carrying out of a project of hydroelectric central. (author)

  14. The Effects of Run-of-River Hydroelectric Power Schemes on Fish Community Composition in Temperate Streams and Rivers.

    Directory of Open Access Journals (Sweden)

    Gary S Bilotta

    Full Text Available The potential environmental impacts of large-scale storage hydroelectric power (HEP schemes have been well-documented in the literature. In Europe, awareness of these potential impacts and limited opportunities for politically-acceptable medium- to large-scale schemes, have caused attention to focus on smaller-scale HEP schemes, particularly run-of-river (ROR schemes, to contribute to meeting renewable energy targets. Run-of-river HEP schemes are often presumed to be less environmentally damaging than large-scale storage HEP schemes. However, there is currently a lack of peer-reviewed studies on their physical and ecological impact. The aim of this article was to investigate the effects of ROR HEP schemes on communities of fish in temperate streams and rivers, using a Before-After, Control-Impact (BACI study design. The study makes use of routine environmental surveillance data collected as part of long-term national and international monitoring programmes at 23 systematically-selected ROR HEP schemes and 23 systematically-selected paired control sites. Six area-normalised metrics of fish community composition were analysed using a linear mixed effects model (number of species, number of fish, number of Atlantic salmon-Salmo salar, number of >1 year old Atlantic salmon, number of brown trout-Salmo trutta, and number of >1 year old brown trout. The analyses showed that there was a statistically significant effect (p<0.05 of ROR HEP construction and operation on the number of species. However, no statistically significant effects were detected on the other five metrics of community composition. The implications of these findings are discussed in this article and recommendations are made for best-practice study design for future fish community impact studies.

  15. Technology transfer in the field of small hydroelectric power stations; Technologietransfer im Bereich Kleinwasserkraft

    Energy Technology Data Exchange (ETDEWEB)

    Meier, U. [SKAT-entec, St Gallen (Switzerland)

    1997-12-31

    The rate at which full-scale technology transfer takes place depends on the quality of the supply companies, i.e. training, organisational development and product infrastructure. These parameters are discussed for the example of a water mill, and a flow diagram is presented. [Deutsch] Wie rasch ein umfassender Transfer in Frage kommt, entscheidet sich mit der Qualitaet und dem Niveau der zuliefernden Betriebe. Hierbei sind Ausbildung, Organisationsentwicklung und Produktionsinfrastruktur besonders angesprochen. Fuer eine Wassermuehle werden diese Parameter konkret eroertert und an Durchlaufdiagrammen erlaeutert. (GL)

  16. The stakes of the hydroelectric power in the integrated management of the Basins. Which place for the EPTB; Les enjeux de l'hydroelectricite dans la gestion integree des bassins versants. Quelle place pour les EPTB

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    In the framework of a sustainable development, the EPTB (Public, Territorial Institutions of Basins) need an evolution of the regulations concerning the management of the hydroelectric power (areas of the Adour, Dordogne, Garonne and Lot). This document presents in two parts the context and the stakes of the hydroelectric concession: the concessions specifications and the analysis of the main articles, the tariffs, taxes and the environment constraints. (A.L.B.)

  17. Environmental impact analysis of the hydroelectric power development sheme in the River Grunnaai in Seljord municipality, Telemark; Konsekvensutredning av kraftutbyggingsprosjekt i Grunnaai i Seljord, Telemark

    Energy Technology Data Exchange (ETDEWEB)

    Muniz, I.P.; Bendiksen, E.; Erikstad, L.; Reitan, O.

    1997-12-31

    This report discusses the possible environmental consequences of a planned hydroelectric power development of the river Grunnaai, Norway. The consequences are found to be small, provided the proper counter measures are taken. Without counter measures, there may be moderate consequences on fish populations and botanical conditions, directly dependent on the changed water flow. The greatest value of the area concerned lies in its unspoiled wilderness character. There are extensive lists of birds and mammals and plant species registered in the river valley. 51 refs., 7 figs., 4 tabs.

  18. Mathematical Modeling in Systems for Operational Evaluation of the Stress-Strain State of the Arch-Gravity Dam at the Sayano-Shushenskaya Hydroelectric Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Bellendir, E. N.; Gordon, L. A., E-mail: lev-gordon@mail.ru; Khrapkov, A. A.; Skvortsova, A. E., E-mail: SkvortsovaAE@vniig.ru [B. E. Vedeneev All-Russia Research Institute of Hydraulic Engineering (VNIIG) (Russian Federation)

    2017-01-15

    Current studies of the stress-strain state of the dam at the Sayano-Shushenskaya Hydroelectric Power Plant at VNIIG based on mathematical modeling including full scale and experimental data are described. Applications and programs intended for automatic operational evaluation of the stress-strain state of the dam for optimizing control of the upper race level in the course of the annual filling-drawdown cycle and during seismic events are examined. Improvements in systems for monitoring the stress-strain state of concrete dams are proposed.

  19. A UK guide to intake fish-screening regulations, policy and best practice with particular reference to hydroelectric power schemes

    Energy Technology Data Exchange (ETDEWEB)

    Turnpenny, A.W.H.; Struthers, G.; Hanson, P.

    1998-07-01

    A review of fish screening regulations in England, Wales, Scotland, and Northern Ireland is presented, and a summary of findings on screening legislation is given. The views of hydroelectric scheme developers, owners and operators are considered, and recommendations including the development of a risk assessment procedure are discussed. Fish screening technology, bypasses and other escape routes, and common fault in screen design and operation are examined, and guidance to Best Practice is given. (UK)

  20. Feasibility Study of Economics and Performance of a Hydroelectric Installation at the Jeddo Mine Drainage Tunnel. A Study Prepared in Partnership with the Environmental Protection Agency for the RE-Powering America's Land Initiative: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites

    Energy Technology Data Exchange (ETDEWEB)

    Roberts, J. O.; Mosey, G.

    2013-02-01

    The U.S. Environmental Protection Agency (EPA), in accordance with the RE-Powering America's Land initiative, selected the Jeddo Tunnel discharge site for a feasibility study of renewable energy potential. The purpose of this report is to assess technical and economic viability of the site for hydroelectric and geothermal energy production. In addition, the report outlines financing options that could assist in the implementation of a system.

  1. Project finance of hydroelectric power plants in Brazil; 'Project finance' de usinas hidroeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Ribeiro Filho, Valfredo de Assis; Ramos, Maria Olivia de Souza [Universidade Salvador (UNIFACS), BA (Brazil)

    2008-07-01

    The aim of this paper is to discuss the modality of project finance of financing of enterprises, which is the main modality of structuring of hydroelectric projects in Brazil. In the discussion will be highlighted the importance of contracts EPC (Engineering, Search and Construction) in the structuring of project finances. This financing model has particular characteristics related to risk sharing and financial flexibility that enable the financing of projects with long-term capital, however, due to participation of various actors and the nature of the structure of project finance, the negotiation and drafting of contracts are always very complex.

  2. Case study analysis of the legal and institutional obstacles and incentives to the development of the hydroelectric power at the Maxwell locks and dam, Pennsylvania

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal, institutional and financial obstacles, and incentives to the development of hydroelectric power at the Maxwell locks and dam on the Monongahela River are analyzed. The study is one of five studies prepared by the Energy Law Institute pursuant to a contract with the National Conference of State Legislators. Each of the five studies views dam development by a different category of developer. These categories include a municipality, a public utility, a state, a private developer, and a cooperative. The Maxwell case study concerns potential development by Allegheny Electric Cooperative. Thus, the analysis of obstacles and incentives is focused on those factors which have particular impact on a cooperative. Subjects covered include a description of the site; developer description; the feasibility study; the economic feasibility; financing; Federal licensing by FERC; state licensing; local interest and requirements; the effect of locks and dam operation by the Army Corp of Engineers; and power marketing.

  3. Power Producer Production Valuation

    Directory of Open Access Journals (Sweden)

    M. Kněžek

    2008-01-01

    Full Text Available The ongoing developments in the electricity market, in particular the establishment of the Prague Energy Exchange (PXE and the associated transfer from campaign-driven sale to continuous trading, represent a significant change for power companies.  Power producing companies can now optimize the sale of their production capacities with the objective of maximizing profit from wholesale electricity and supporting services. The Trading Departments measure the success rate of trading activities by the gross margin (GM, calculated by subtracting the realized sales prices from the realized purchase prices and the production cost, and indicate the profit & loss (P&L to be subsequently calculated by the Control Department. The risk management process is set up on the basis of a business strategy defining the volumes of electricity that have to be sold one year and one month before the commencement of delivery. At the same time, this process defines the volume of electricity to remain available for spot trading (trading limits. 

  4. Methodology to identify the location of shoals of fish downstream from hydroelectric power plant; Metodologia para identificar a locacao de cardumes de peixes a jusante de UHE

    Energy Technology Data Exchange (ETDEWEB)

    Martinez, C.B.; Viana, E.M.F.; Faria, M.T.C. de [Universidade Federal de Minas Gerais, Belo Horizonte, MG (Brazil). Centro de Pesquisas Hidraulicas e Recursos Hidricos], Emails: martinez@cce.ufmg.br, ednamariafaria@ufmg.br, mtcdf@uol.com.br

    2009-07-01

    The location identification of fish shoals at the downstream of an hydroelectric power plants is a task of importance especially when one takes into account the need to identify possible locations for the deployment of fish transportation mechanism. This paper presents a methodology based on the use of reduced models, which will be operated during the biological testing, under flow and conditions similar to the field where will be included shoals of fish. These groups will be observed during a period of time under varying conditions of discharge of hydraulic turbines. At the end of this observation it can be identified preferential location areas of fish shoals that will be evaluated later in order to install transposition systems in the place.

  5. Analysis of legal obstacles and incentives to the development of low-head hydroelectric power in Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level in Maine is discussed. The Federal government also exercises extensive regulatory authority in the area. The dual regulatory system is examined. The first step any developer of small-scale hydropower must take is to acquire right, title, or interest in the real property. In Maine, that step requires acquisition in some form of both river banks, the river bed, and where necessary, the land needed for the upstream impoundment area. The developer must acquire the river banks to be considered a riparian owner. Classification as a riparian is important, for only a use of water by a riparian owner is deemed a reasonable use and hence a legal use. A non-riparian could not draw water from a stream to increase the water level of an impoundment area on another stream. Apart from the usual methods of land acquisition involving sale, lease, or perhaps gift, Maine has two somewhat unique methods a developer may use for property acquisition. These methods, authorized by statute, are use of the abandoned dams law and use of the Mill Dam Act for flowage of upstream impoundment areas.

  6. Tidal power in Argentina

    Energy Technology Data Exchange (ETDEWEB)

    Aisiks, E.G.

    1993-03-01

    This presentation describes the tidal power potential of Argentina and the current status of its utilization. The topics of the presentation include tidal power potential, electric production of the region and the Argentine share of production and consumption, conventional hydroelectric potential, economic feasibility of tidal power production, and the general design and feasibility of a tidal power plant planned for the San Jose Gulf.

  7. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  8. Small scale power production

    Energy Technology Data Exchange (ETDEWEB)

    Muoniovaara, M. [IVO International Ltd, Vantaa (Finland)

    1996-12-31

    IVO International is a major constructor of biomass power plants in Finland and abroad. As a subsidiary of Imatran Voima Oy, the largest power utility in Finland, it has designed and constructed ten power plants owned by IVO Group or others capable of burning biomasses. Sizes of the plants vary from the world`s largest condensing peat-fired power plant of 155 MWe to a 6 MWe combined heat and power producing unit. This article describes the biomass power plants designed and constructed by IVO Group 3 refs.

  9. 76 FR 6820 - Contract for Hydroelectric Power Development at the C-Drop, a Feature of the Klamath Project...

    Science.gov (United States)

    2011-02-08

    ... Power Administration's (Western) purchasing and/or marketing the power, contact Ms. Sonja Anderson, Power Marketing Manager, Western Area Power Administration, Sierra Nevada Region, 114 Parkshore Drive... purchasing and/or marketing considerations. Interested entities are invited to submit a proposal on this...

  10. Design and construction of landslide preventive construction at Yamasubara hydroelectric power plant site. Yamasubata hatsudensho chiten ni okeru jisuberi taisaku koji no sekkei seko ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Takase, H.; Ito, M.; Sakata, M. (The Kyushu Electric Power Co. Inc., Fukuoka (Japan))

    1993-07-30

    This paper reports the design and construction of landslide preventive construction at the site of the Yamasubara hydroelectric power plant (with a maximum output of 40,700 kW) and the result of slope stability verification after completion of the construction. The moderate slope on top of the primary slide has sands presumed to be colluvial deposit distributed with a depth of 10 m or more, where occurrence of a secondary slip was feared as triggered by the primary slide. The power plant protective constructions consisted of concrete walls to protect the entire power plant including buildings, and falling stone protective fences installed around the surge tanks. The temporary measures were so set that groundwater levels are lowered to a level that can assure the slide safety factor of 1.0 or more by means of drain boring using the down-the-hole hammer type. The permanent protective construction used rock anchors that are superior in constructability and economy. The stability of sliding slope faces was verified to confirm effects of the protective constructions. The verification included observations of groundwater level behavior, water well-up from drain holes, and movements in the slopes. The result showed that the protective constructions have give sufficient effects. Continued slope stability control is important. 16 figs., 7 tabs.

  11. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... Western's purchasing and/or marketing the power may be obtained at Western Area Power Administration, Rocky Mountain Region, Attn: Dave Neumayer, Power Marketing Manager, 5555 East Crossroads Blvd.../or marketing considerations. Interested entities are invited to submit a proposal on this project...

  12. 76 FR 22143 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ...'s purchasing and/or marketing the power may be obtained at Western Area Power Administration, Rocky Mountain Region, Attn: Dave Neumayer, Power Marketing Manager, 5555 East ] Crossroads Blvd., Loveland, CO... marketing considerations. Interested entities are invited to submit a proposal on this project. DATES: A...

  13. Rural electrification in Santarem: contribution of micro hydroelectric power plants; Eletrificacao rural em Santarem: contribuicao das micro centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Els, Rudi Henri Van; Diniz, Janaina Deane De Abreu Sa; Souza, Josiane do Socorro Aguiar de; Brasil Junior, Antonio Cesar Pinho; Sousa, Antonio Nazareno Almada de [Universidade de Barsilia (UnB), DF (Brazil). Lab. de Energia e Ambiente; Kroetz, Jaemir Grasiel [Indalma Industria e Comercio, Santarem, PA (Brazil)

    2010-07-01

    The municipality of Santarem in the lower Amazon river is the main center in the western region of the state of Para with a population of 274.285 inhabitants, with 31.633 of them living in the rural zone, where only 1.060 rural costumers have access to regular electricity service from the utility provider. This incipient coverage of electricity service in the rural zone urged the local population to look for alternatives. This was found in the use of the hydraulic potential of creeks and rivers with rapids and waterfalls to implement pico and micro hydroelectric plants. So since 2001, 44 pico and 12 micro hydropower plants were installed in the municipalities of Santarem, Belterra and Uruara in the state of Para by local entrepreneurs and communities to attend their basic electricity needs. These systems attend approximately 580 families with a total installed capacity of more than 700 kVA. The consolidation of this technological alternative induced the Regional Superintendent of the Institute for Colonization and Land Reform (INCRA) and the Municipality of Santarem to elaborate a project to attend the land reform settlements in the region. This led to the installation of 6 micro hydropower (MHP) with a total installed capacity of 820kVA and a 252 km distribution network to attend 1.630 families in the settlements of Moju and Corta Corda. The purpose of this paper is to present the MHP's installed in the region and to show the contribution of these units in the rural electrification of rural settlements in Santarem. The paper discusses also the management model of these units. The survey's methodology consisted in the systematization of project data from the plant builder, INCRA and the municipality. The information was obtained from the official bibliography from the local actors and complemented by field surveys with interviews and observation. Despite the fact that the MHP's are in operation, they are not yet registered in the data base of the

  14. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  15. Study on the technical and economical viability in the using of the spilled turbinable energy from the Itaipu Hydroelectric Power Plant for the ammonia synthesis of the nitrogen fertilizers; Estudo da viabilidade tecnica e economica do aproveitamento da energia vertida turbinavel da usina hidreletrica de Itaipu para sintese de amonia para fertilizantes nitrogenados

    Energy Technology Data Exchange (ETDEWEB)

    Espinola, Michel Osvaldo Galeano [Universidade Nacional de Assuncao (Paraguay). Faculdade de Ciencias Quimicas]. E-mail: michelosvaldo@qui.una.py

    2008-07-01

    In many hydroelectric power plants, when the inflows are greater than the demand for energy, a portion of the water that could be used to generate energy is diverted to the spillway and literally wasted. This energy, designated as 'Spilled Turbinable Energy', could be used advantageously to generate other products or an energy vector that could be stored for later use, since in these occasions the dam is full. The present work studies the feasibility of using the spilled turbinable energy of the Itaipu Hydroelectric Power Plant to produce electrolytic hydrogen that, together with the nitrogen from air, is an important feedstock for the ammonia synthesis, used to produce nitrogen fertilizers. The minimum production cost of electrolytic hydrogen was estimated in US$ 0,246/m3 or US$ 2,750/kg, for a plant with capacity of 55 mil m3/h, which correspond to 247,5 MW of electrical power deriving from 82% of spilled turbinable energy and 18% of guaranteed energy. Next to that hydrogen plant it is possible to install an ammonia plant of approximately 500 t/day, operating 350 days/year, with a production cost of approximately US$ 562,81/t. This capacity is enough to supply 38,5% of the ammonia demand estimated for the region focused in the project, 1.300 t/day. Nowadays, ammonia is commercialized in the Brazilian market by approximately US$ 525,60/t. For that reason, it can be concluded that ammonia production through the association of spilled turbinable and guaranteed energy next to Itaipu Hydroelectric Power Plant is not economically feasible by the moment, mainly due to the high cost of imported electrolysers. Nevertheless, with the installation of an ammonia plant based on water electrolysis next to Itaipu Hydroelectric Power Plant, it could be avoided an annual carbon emission of 234 thousand tons, even considering methane and carbon dioxide emissions of the Itaipu's reservoir. If such project were approved by the Clean Development Mechanism, that

  16. On optimization of power production

    Energy Technology Data Exchange (ETDEWEB)

    Feltenmark, S.

    1997-01-01

    Short-term optimization of power production is treated. It concerns the problem of determining a production schedule for a power system, which minimizes the total cost of production, while satisfying various constraints. The thesis consists of an introductory chapter, four chapters that each concerns a specific problem area (economic dispatch, unit commitment, hydro power planning and cogeneration optimization), plus a chapter with relevant theory. The emphasis of the thesis is on the mathematical structures that arise in problems in this field, and how to exploit them algorithmically. A recurring theme is convexification, either implicit, by dualization, or explicit, as in our approach to hydro power optimization. 134 refs

  17. Adding a small hydroelectric power plant to the drinking water supply of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'eau potable de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    The actual drinking water supply no longer satisfies the needs of the Liddes community (southwestern Switzerland). This final report prepared for the Swiss Federal Office of Energy (SFOE) describes the results of a study for an enhanced water supply system including a small hydroelectric power plant. The authors propose to collect the water of two sources of the mountain torrent Aron and to use the considerable pressure difference for power generation. Four variants have been studied differing in the exact height difference, the flow rate and the location of the turbine building. The recommended variant delivers a nominal flow of 18 l/s at difference in height of 377 m to a Pelton turbine equipped with a single injector, resulting in an electrical power output of 54 kW. Electrical power production would amount to 281,000 kWh/year and the production cost to 0.126 CHF/kWh.

  18. Anthropic contribution on pollution in hydroelectric reservoirs: the case of Sao Simao's hydroelectric power plant - GO/MG, Brazil; Contribuicao antropica na poluicao de reservatorios hidreletricos: o caso da Usina Hidreletrica de Sao Simao - GO/MG

    Energy Technology Data Exchange (ETDEWEB)

    Fonseca, Gizele Araujo Borba da

    2010-02-15

    This study aimed to evaluate the contribution of anthropogenic pollution in hydroelectric reservoirs through a case study of the Sao Simao Hydropower. The literature relates the problem of eutrophication with the addition of nutrients (nitrogen and phosphorus) in excess, resulting in water pollution. Through data for both tributary rivers and the reservoir, it was found that the Sao Simao dam presents a framework for eutrophication. We made an analysis to see which tributary rivers were the main sources of nutrients released into the waters of the reservoir and a survey of possible human activities that are contributing to the intake of nutrients in these tributaries. (author)

  19. 78 FR 48185 - Notice of Intent To Contract for Hydroelectric Power Development on the San Juan-Chama Project...

    Science.gov (United States)

    2013-08-07

    ...) 756-2175. Information related to Western's purchasing and/or marketing of the power may be obtained by... diversions, and three tunnels. The Azotea Tunnel Outlet empties into Willow Creek and has the capacity to... transmission lines. Estimate and describe installed capacity and the capacity of the power facilities. Also...

  20. Case studies of the legal and institutional obstacles and incentives to the development of small-scale hydroelectric power: Bull Run, Portland, Oregon

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-05-01

    The National Conference of State Legislatures' Small-Scale Hydroelectric Policy Project is designed to assist selected state legislatures in looking at the benefits that a state can derive from the development of small-scale hydro, and in carrying out a review of state laws and regulations that affect the development of the state's small-scale hydro resources. The successful completion of the project should help establish state statutes and regulations that are consistent with the efficient development of small-scale hydro. As part of the project's work with state legislatures, seven case studies of small-scale hydro sites were conducted to provide a general analysis and overview of the significant problems and opportunities for the development of this energy resource. The case study approach was selected to expose the actual difficulties and advantages involved in developing a specific site. Such an examination of real development efforts will clearly reveal the important aspects about small-scale hydro development which could be improved by statutory or regulatory revision. Moreover, the case study format enables the formulation of generalized opportunities for promoting small-scale hydro based on specific development experiences. The case study for small-scale hydro power development at the City of Portland's water reserve in the Bull Run Forest is presented with information included on the Bull Run hydro power potential, current water usage, hydro power regulations and plant licensing, technical and economic aspects of Bull Run project, and the environmental impact. (LCL)

  1. Recuperação em área de empréstimo usada para construção de usina hidrelétrica Recovery of nativa area used for construction of hydroelectric power station

    Directory of Open Access Journals (Sweden)

    Marlene C. Alves

    2012-08-01

    Full Text Available A recuperação de áreas de empréstimo usada para construção de hidrelétricas é um processo lento que requer o uso de plantas de cobertura, como fonte de matéria orgânica e a aplicação de nutrientes e corretivos como condicionadores dos atributos do solo. Portanto, objetivou-se, com este trabalho, estudar a recuperação de atributos físicos do subsolo de um Latossolo Vermelho distrófico, utilizado no terrapleno e fundação da Usina Hidrelétrica de Ilha Solteira, SP. O delineamento utilizado foi em blocos casualizados com oito tratamentos e quatro repetições. A pesquisa foi implantada em 1992. Os tratamentos se constituíram do uso de adubos verdes, braquiária e correção do solo. Após 13 anos foram avaliados: porosidade total do solo, macroporosidade, microporosidade, densidade do solo, estabilidade de agregados, resistência do solo à penetração, teor de matéria orgânica e produção de matéria seca da braquiária. Os tratamentos adotados estão recuperando, de forma lenta, os atributos físicos do subsolo exposto. Os efeitos da recuperação do solo estão atingindo a profundidade de 0-0,10 m.The recovery of native area used in hydroelectric power station construction is a slow process, and it requires the use of covering plant as a source of organic matter, application of nutrients and amendments as soil conditioner. Thus, this study has the objective to study the recovery of physical attribute of subsoil in a distrophic Red Latosol, used in the embankment and foundation of Hydroelectric Power Station, Ilha Solteira, São Paulo, Brazil. The design used was randomized blocks with eight treatments and four replications. The research started in 1992. The treatments consisted of green manure, pasture and soil amendment. After 13 years, total porosity, macroporosity, microporosity, bulk density, aggregate stability, resistance to penetration, organic matter of soil and dry matter of pasture production were evaluated. The

  2. An Implementation of Estimation Techniques to a Hydrological Model for Prediction of Runoff to a Hydroelectric Power-Station

    Directory of Open Access Journals (Sweden)

    Magne Fjeld

    1981-01-01

    Full Text Available Parameter and state estimation algorithms have been applied to a hydrological model of a catchment area in southern Norway to yield improved control of the household of water resources and better economy and efficiency in the running of the power station, as experience proves since the system was installed on-line in the summer of 1978.

  3. Analysis of the technological innovations acquisition: a comparative case study between a hydroelectric power plant and a thermoelectric plant

    Directory of Open Access Journals (Sweden)

    Fabricio Baron Mussi

    2017-06-01

    Full Text Available This paper aims to present a comparative investigation of the evaluation criteria which determine the decision to adopt new technologies on the part of the environmental management departments in two organizations from the power generation sector. The option for this sector is relevant since it is composed of organizations supervised by regulatory agencies, which apply similar levels of pressure on them. The choice for the studied cases was intentional, and criteria used consisted not only of their access, but also their relevance for the country’s power generation needs. The methodology employed was of a qualitative nature, and represents a comparative case study. It was observed that the financial and operational nature criteria were predominant. Finally, the fact that culture influences attitudes to sustainability and environmental legislation, and that the technical context associated with efficiency and the socio-environmental context in which the power plants operate, interfere in the criteria for selection and acquisition of innovations, was verified. Based on these observations, a conceptual model is tendered.

  4. High power neutron production targets

    Energy Technology Data Exchange (ETDEWEB)

    Wender, S. [Los Alamos National Lab., NM (United States)

    1996-06-01

    The author describes issues of concern in the design of targets and associated systems for high power neutron production facilities. The facilities include uses for neutron scattering, accelerator driven transmutation, accelerator production of tritium, short pulse spallation sources, and long pulse spallation sources. Each of these applications requires a source with different design needs and consequently different implementation in practise.

  5. Methodology for maintenance analysis based on hydroelectric power stations reliability; Metodologia para realizar analisis de mantenimiento basado en confiabilidad en centrales hidroelectricas

    Energy Technology Data Exchange (ETDEWEB)

    Rea Soto, Rogelio; Calixto Rodriguez, Roberto; Sandoval Valenzuela, Salvador; Velasco Flores, Rocio; Garcia Lizarraga, Maria del Carmen [Instituto de Investigaciones Electricas, Cuernavaca, Morelos (Mexico)

    2012-07-01

    A methodology to carry out Reliability Centered Maintenance (RCM) studies for hydroelectric power plants is presented. The methodology is an implantation/extension of the guidelines proposed by the Engineering Society for Advanced Mobility Land, Sea and Space in the SAE-JA1012 standard. With the purpose of answering the first five questions, that are set out in that standard, the use of standard ISO14224 is strongly recommended. This approach standardizes failure mechanisms and homogenizes RCM studies with the process of collecting failure and maintenance data. The use of risk matrixes to rank the importance of each failure based on a risk criteria is also proposed. [Spanish] Se presenta una metodologia para realizar estudios de mantenimiento Basado en Confiabilidad (RCM) aplicados a la industria hidroelectrica. La metodologia es una implantacion/ extension realizada por los autores de este trabajo, de los lineamientos propuestos por la Engineering Society for Advanced Mobility Land, Sea and Space en el estandar SAE-JA1012. Para contestar las primeras cinco preguntas del estandar se propone tomar como base los modos y mecanismos de fallas de componentes documentados en la guia para recopilar datos de falla en el estandar ISO-14224. Este enfoque permite estandarizar la descripcion de mecanismos de fallas de los equipos, tanto en el estudio RCM como en el proceso de recopilacion de datos de falla y de mantenimiento, lo que permite retroalimentar el ciclo de mejora continua de los procesos RCM. Tambien se propone el uso de matrices de riesgo para jerarquizar la importancia de los mecanismos de falla con base en el nivel de riesgo.

  6. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    Directory of Open Access Journals (Sweden)

    Benjamin D Cross

    Full Text Available In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year relationships between wind speed and streamflow behavior, using British Columbia (BC and the Pacific Northwest (PNW as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD estimates from a height of 10m (North American Regional Reanalysis, NARR were correlated with cumulative usable inflows (CUI for BC (collected from BC Hydro for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55, whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25 along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast.

  7. COMPARISON OF CALCULATED AND OBSERVED SEISMIC ACCELERATIONS IN COMPOSITE-TYPE ROCK-FILL DAM OF THE DNESTROVSKAYA HYDRO-ELECTRIC POWER PLANT DURING EXPERIMENTAL EXPLOSIONS

    Directory of Open Access Journals (Sweden)

    A. A. Matvienko

    2016-01-01

    Full Text Available A methodology for determination of seismic accelerations in earth dams has been developed within the framework of seismic resistance wave theory. In this case we take into account an influence of the dam foundation and seismic wave emission into it. The methodology is based on numerical solution of the dynamic problem while using a finite difference method. A software program SGD “Determination of seismic acceleration in the earth dam” has been prepared on the basis of the developed methodology. The program allows to evaluate ordinates of calculation orthographic representations for acceleration throughout the dam height for all time moments. Thus, it is possible to obtain the most dangerous acceleration orthographic representations at direct and reverse seismic actions. The papers presents verification (compliance test of calculated and observed seismic accelerations for the rock-fill dam of the Dnestrovskaya Hydro-Electric Power Plant No 1. The observed seismic accelerations have been obtained during experimental explosions. The calculated seismic accelerations have been obtained in accordance with the proposed methodology for determination of seismic accelerations in the earth dams. A comparative analysis of calculation results with the data of field observations has demonstrated that a maximum difference between extreme accelerations obtained by calculation, and during field observations, do not exceed 10.11 % for the dam crest, and 6.56 % for its bottom. The obtained results permit to recommend the developed program for engineering calculations of seismic accelerations in the earth dams. The program application will make it possible to determine seismic acceleration in the earth dam with sufficient reliability.

  8. The Impacts of Wind Speed Trends and 30-Year Variability in Relation to Hydroelectric Reservoir Inflows on Wind Power in the Pacific Northwest.

    Science.gov (United States)

    Cross, Benjamin D; Kohfeld, Karen E; Bailey, Joseph; Cooper, Andrew B

    2015-01-01

    In hydroelectric dominated systems, the value and benefits of energy are higher during extended dry periods and lower during extended or extreme wet periods. By accounting for regional and temporal differences in the relationship between wind speed and reservoir inflow behavior during wind farm site selection, the benefits of energy diversification can be maximized. The goal of this work was to help maximize the value of wind power by quantifying the long-term (30-year) relationships between wind speed and streamflow behavior, using British Columbia (BC) and the Pacific Northwest (PNW) as a case study. Clean energy and self-sufficiency policies in British BC make the benefits of increased generation during low streamflow periods particularly large. Wind density (WD) estimates from a height of 10m (North American Regional Reanalysis, NARR) were correlated with cumulative usable inflows (CUI) for BC (collected from BC Hydro) for 1979-2010. The strongest WD-CUI correlations were found along the US coast (r ~0.55), whereas generally weaker correlations were found in northern regions, with negative correlations (r ~ -0.25) along BC's North Coast. Furthermore, during the lowest inflow years, WD anomalies increased by up to 40% above average values for the North Coast. Seasonally, high flows during the spring freshet were coincident with widespread negative WD anomalies, with a similar but opposite pattern for low inflow winter months. These poorly or negatively correlated sites could have a moderating influence on climate related variability in provincial electricity supply, by producing greater than average generation in low inflow years and reduced generation in wet years. Wind speed and WD trends were also analyzed for all NARR grid locations, which showed statistically significant positive trends for most of the PNW and the largest increases along the Pacific Coast.

  9. Application of multi-model control with fuzzy switching to a micro hydro-electrical power plant

    Energy Technology Data Exchange (ETDEWEB)

    Salhi, Issam; Doubabi, Said [Laboratory of Electric Systems and Telecommunications (LEST), Faculty of Sciences and Technologies of Marrakesh, Cadi Ayyad University, BP 549, Av Abdelkarim Elkhattabi, Gueliz, Marrakesh (Morocco); Essounbouli, Najib; Hamzaoui, Abdelaziz [CReSTIC, Reims University, 9, rue de Quebec B.P. 396, F-10026 Troyes cedex (France)

    2010-09-15

    Modelling hydraulic turbine generating systems is not an easy task because they are non-linear and uncertain where the operating points are time varying. One way to overcome this problem is to use Takagi-Sugeno (TS) models, which offer the possibility to apply some tools from linear control theory, whereas those models are composed of linear models connected by a fuzzy activation function. This paper presents an approach to model and control a micro hydro power plant considered as a non-linear system using TS fuzzy systems. A TS fuzzy system with local models is used to obtain a global model of the studied plant. Then, to combine efficiency and simplicity of design, PI controllers are synthesised for each considered operating point to be used as conclusion of an electrical load TS Fuzzy controller. The latter ensures the global stability and desired performance despite the change of operating point. The proposed approach (model and controller) is tested on a laboratory prototype, where the obtained results show their efficiency and their capability to ensure good performance despite the non-linear nature of the plant. (author)

  10. Ecologically justified regulatory provisions for riverine hydroelectric power plants and minimum instream flow requirements in diverted streams; Oekologisch begruendete, dynamische Mindestwasserregelungen bei Ausleitungskraftwerken

    Energy Technology Data Exchange (ETDEWEB)

    Jorde, K.

    1997-12-31

    The study was intended to develop a model versatile enough to permit quantification of various water demand scenarios in connection with operation of riverine hydroelectric power plants. Specific emphasis was to be placed on defining the minimum instream flow to be maintained in river segments because of the elementary significance to flowing water biocinoses. Based on fictitious minimum water requirements, various scenarious were simulated for flow regimes depending on power plant operation, so as to establish a system for comparative analysis and evaluation of resulting economic effects on power plant efficiency on the one hand, and the ecologic effects on the aquatic habitat. The information derived was to serve as a basis for decision-making for regulatory purposes. For this study, the temporal and spatial variability of the flow regime at the river bed in a river segment was examined for the first time. Based on this information, complemented by information obtained from habitat simulations, a method was derived for determination of ecologic requirements and their incorporation into regulatory water management provisions. The field measurements were carried out with the FST hemisphere as a proven and most efficient and reliable method of assessing flow regimes at river beds. Evaluation of the measured instream flow data characterising three morphologically different segments of diverted rivers was done with the CASIMIR computer code. The ASS models derived were used for comparative assessment of existing regulatory provisions and recommended amendments determining required minimum instream flow in diverted rivers. The requirements were defined taking as a basis data obtained for three different years. (orig./CB) [Deutsch] Ziel der Arbeit war die Entwicklung eines Modellverfahrens, das flexibel die Quantifizierung unterschiedlicher Nutzansprueche an Laufwasserkraftanlagen ermoeglicht. Insbesondere der Erhalt einer gewissen Dynamik, die fuer

  11. Reactivation of small hydroelectric power plant St. Marienthal Monastery, Ostritz. Final report from the 2nd part from planning to achievement; Reaktivierung der Wasserkraftanlage des Klosterstiftes St. Marienthal, Ostritz. Abschlussbericht zum zweiten Teil fuer die Bearbeitungsphasen der Projektierung bis zur Fertigstellung

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, M.

    2001-07-01

    The hydroelectric power plant St. Marienthal Monastery on the river Lausitzer Neisse, which forms part of the border between Poland and Germany, was rehabilitated and modernized in the period between October 1999 and September 2000. The scheme to reactivate this plant was implemented as an external EXPO 2000 project for renewable energy production and sustainable management. On 6 October 2000, the hydroelectric power plant was officially put back into operation by Steffen Flath, Minister for the Environment and Agriculture in the German state of Saxony. The paper describes the special planning factors involved and the execution of construction work. (orig.) [German] Wiederbelebung der 1967 eingestellten Stromerzeugung bei weit hoeherer Effizienz unter Beibehaltung der oertlichen Gegebenheiten, die von den Rahmenbedingungen des Denkmalschutzes vorgegeben werden. Verzicht auf tiefe Eingriffe in den Unterlauf des Flusses, der durch Brueckentruemmer des zweiten Weltkrieges im Ablauf Stoerungen zeigt. Trotz hoeherer Wasserentnahme als bei der historischen Anlage soll die Durchgaengigkeit fuer Fische mittels einer Fischtreppe garantiert werden. Ziel ist es, das Kloster selbst und das auf seinem Territorium eingerichtete Internationale Begenungszentrum St. Marienthal vom Jahresertrag her selbst zu versorgen und ueberschuessigen Strom in das Netz der Energieversorgung Sachsen Ost AG einzuspeisen. Die Besonderheit dieser Anlage besteht darin, schon bestehende Bauwerke wieder zu nutzen, die erzeugte Energie zu demonstrieren, messen und in bei der EXPO 2000 zur energieoekologischen Modellstadt Ostritz darzustellen. (orig.)

  12. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  13. River ice implications related to water power production in Norway

    Energy Technology Data Exchange (ETDEWEB)

    Asvall, R.P. [Norwegian Water Resources and Energy Directorate, Oslo (Norway). Hydrology Dept.

    2009-07-01

    Nearly 99 per cent of the electricity produced in Norway is based on water power. While the period of large power development is over, the current focus lies in developing small hydroelectric power plants. A new market based energy law was implemented in Norway in 1991 to achieve more efficient use of electricity production by means of market forces. Since water regulation influences ice conditions in lakes and rivers, this paper focused on the implications of changes in ice conditions. In Norway, the expected changes in ice conditions are taken into account when issuing permits for water regulations and schemes for water discharge because some waterways are used as winter roads. Follow-up includes both close and long term observations and measurements. The impact of variable price on power was also discussed, with particular reference to ice conditions in cases where water discharge occurs on rivers. This paper summarized selected ice problems and how they have been handled. The paper also included a summary of anticipated climatic changes relevant to ice conditions.

  14. Application of fuzzy logic in mapping the environmental impacts of hydroelectric power plants; Aplicacao da logica difusa no mapeamento de impactos ambientais em usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Melo, M.N.; Lambert-Torres, G.; Silva, L.E. Borges da [Universidade Federal de Itajuba (UNIFEI), MG (Brazil)], Emails: germanoltorres@gmail.com, leborges@unifei.edu.br; Rissino, S.; Silva, M.F. da [Universidade Federal de Rondonia (UFRO), Porto Velho, RO (Brazil)], e-mails: srissino@gmail.com, felipe@unir.br

    2009-07-01

    During the stages prior to installation of a large enterprise, there is an obligation to obtain an environmental license for its effectiveness. However, defining the relevance of an environmental impact generated by changes elapsed in a region, is something subjective, since some variables present qualitative definitions. Aiming to interrelate the variables that influence the environmental impacts in hydroelectric plants, was made the mapping of terms natural resources and degradation of the environment, and its defining variables, based on the theory of fuzzy logic. The construction of fuzzy propositions was based on the manipulation of a rule base, with the 'if' antecedent 'then' consequent structure. It was concluded that the use of fuzzy propositions for the study of environmental impact is an effective method to map the environmental impact caused by construction of a hydroelectric plant, because it defines the degree of influence of impact on the environment.

  15. Feasibility study for the partial conversion of a hydropower plant into a pumped-storage power plant: a case study of hydroelectric power plant La Barca (Asturias, Spain

    Directory of Open Access Journals (Sweden)

    E. Antuña Yudego

    2017-01-01

    Full Text Available Renewable energy sources have reported an unprecedented increase of global installed renewable power capacity. Against the advantages provided by this renewable power generation technology it should be taken into account an important issue: these intermittent energy sources supply a fluctuating output which is difficult to manage. Pumped-storage hydro power plants reappear in these circumstances as an efficient form of energy storage which allows to use reserves when necessary, enabling power generation output to cover continuously this energy demand. The present paper shows a simplified feasibility study of the partial conversion of hydropower plant La Barca, in Asturias, into a reversible storage through the development of an algorithm to simulate its operation according to electricity market prices. For this purpose, the operation in the deviation management market is considered and the technical modifications required for the conversion are shown. The estimation of costs and incomes present a feasible scenario.

  16. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the northeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    1980-05-01

    A preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the 19 northeastern US (Maine, New Hampshire, Vermont, Massachusetts, Rhode Island, Connecticut, New York, New Jersey, Pennsylvania, Ohio, Indiana, Michigan, Illinois, Wisconsin, Kentucky, Maryland, Delaware, Virginia, and West Virginia) is presented. The statutes and case laws of the 19 states and the Federal government which affect developers of small dams are stressed. The legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved are emphasized.

  17. Preliminary analysis of legal obstacles and incentives to the development of low-head hydroelectric power in the Northeastern United States

    Energy Technology Data Exchange (ETDEWEB)

    Brown, P. W.; Buxton, A. W.

    1979-03-12

    This report presents a preliminary analysis of the legal obstacles and incentives to the development of the low-head hydroelectric potential of the nineteen states making up the northeastern quandrant of the U.S. The intended subject matters of the report are the statutes and case laws of the nineteen states and the Federal government which affect developers of small dams. The actual subject matters of this report are the legal uncertainty which confronts the developer of small dams and the regulatory burden to which the developer may be subjected once the uncertainty is resolved. The objective has been to locate and describe the laws and doctrines which directly or indirectly affect developers of small dams. The report reaches no final conclusion concerning the nature or impact of any particular law or doctrine on the developer of small dams. For ease of analysis, the mythical State of Hydrovania is described and its regulatory and legal systems analyzed.

  18. Analysis of environmental studies of the mammals in small hydroelectrics power in the Espirito Santo; Analise dos estudos ambientais da mastofauna em pequenas centrais hidreletricas do Espirito Santo

    Energy Technology Data Exchange (ETDEWEB)

    Bonesi, Patricia Conde

    2011-10-15

    The hydroelectric projects have been the main form to supply the energy demand in Brazil. Although it has been considered a way of clean generation, it brings many environmental impacts. Due to the fact that inconsistencies in environmental impact studies often occur, this study aimed to evaluate the quality of environmental diagnosis of the mammals in SHP in the Espirito Santo. Therefore, was notice an insufficient data survey, because of the relevance given to the secondary data and the lack of seasonal investigations, bringing damages to the proposals submitted of environmental compensation. This way, manners ware proposed that aim to improve the quality of these studies, which include since environmental awareness programs at the penalizing of those involved in such studies. (author)

  19. Ecological improvements to hydroelectric power plants under EEG. Guidance to environmental verifiers and water rights authorities; Oekologische Verbesserungsmassnahmen an Wasserkraftanlagen gemaess EEG. Leitfaden fuer Umweltgutachter und Wasserrechtsbehoerden

    Energy Technology Data Exchange (ETDEWEB)

    Meyr, Christoph; Pfeifer, Hansjoerg [EVIT GmbH Ingenieurbuero Unternehmensberatung, Muenchen (Germany); Schnell, Johannes; Hanfland, Sebastian [Landesfischereiverband Bayern e.V., Muenchen (Germany)

    2011-11-15

    The use of hydropower as a renewable form of energy is experiencing a renaissance due to the energy transition in Bavaria. The fishery evaluate not uncritically this development, because hydroelectric plants generally normally represent a considerable intervention in water and therefore in the habitat of the fish. In this case it should be noted that just often not even the minimum requirements of ecology are fulfilled at existing plants according to the Federal Water Act. [German] Die Nutzung der Wasserkraft als regenerative Energieform erlebt aufgrund der Energiewende in Bayern derzeit eine Art Renaissance. Die Fischerei bewertet diese Entwicklung nicht unkritisch, stellen Wasserkraftanlagen in der Regel doch einen erheblichen Eingriff in Gewaesser und somit den Lebensraum der Fische dar. Dabei ist festzustellen, dass gerade an bestehenden Anlagen haeufig nicht einmal die Mindestanforderungen der Oekologie erfuellt werden, wie sie das Wasserhaushaltsgesetz vorschreibt.

  20. Technological characterization of basaltic rocks of Canoas I Hydroelectric Power Plant, Paranapanema river, Sao Paulo - Parana states, Brazil; Caracterizacao tecnologica das rochas basalticas da Usina Hidroeletrica Canoas I, Rio Paranapanema, SP/PR

    Energy Technology Data Exchange (ETDEWEB)

    Marrano, Antonio

    1997-07-01

    Basaltic litotypes from the rock mass foundation of Canoas I Hydroelectric Power Plant were submitted to technological characterization tests, in order to verify their suitability as construction material. Physical and mechanical properties (density, porosity, water absorption, ultrasonic velocity, compressive and splitting tensile strength, among others) were determined, besides petrographic analyses. Weather ability tests were also performed, not only through wetting-drying cycles and by immersion in ethylene glycol but by outdoor exposure as well, using crushed and core drilled specimens. Detailed procedures for the weather ability test using core specimens from rotary drilling are given. It is analyzed the influence of a geological feature (fault zone, about 10 meters thick and 20 degrees dip), that occurs in the rock mass foundation, on the technological properties of these rocks. Basaltic litotypes selected as construction material are then pointed out. (author)

  1. Change in runoff characteristics of alpine flowing waters caused by the use of hydroelectric power and its effects on the macro-benthos. Das durch Wasserkraftnutzung veraenderte Abflussregime eines alpinen Fliessgewaessers und dessen Auswirkungen auf das Makrobenthos

    Energy Technology Data Exchange (ETDEWEB)

    Ammann, M.

    1993-01-01

    A typical form of change in runoff characteristics caused by the widespread use of hydroelectric power in Switzerland is the intermittent draining (torrent operation). It is the aim of the present work to help elucidate possible consequences of these changes in drain onto the benthobiocoenosis. The study was carried through on the Secklisbach at Oberrickenbach (in the semicanton of Nidwalden) and one of its side streamlets (800m above sea level). The macroinvertebrate coenosis was studied at four locations with similar conditions of drainage basin, population density and topography but varying in the degree of impairment to the draining. There were monthly benthos samples taken using a Surber sampling-device. Results show that the locations not only varied in drain, but also in temperature, this being a consequence of water storage by the power plant. The readings pointed out different values for the locations in daily average temperature, day amplitudes and half-yearly temperature sums. The annual average temperatures, however, did hardly differ. With the water, there is warmth being held back as well in the storage basin in summer, which in winter flows off with the process water. The hydroelectric operation with water storage leads to an intermittent drain with ecological consequences. In order to preserve a stretch of water as a biotope for the naturally found lotic organisms a constant minimum drain has to be guaranteed all year long. In order to avoid clogging, the interstitium has to be cleaned regularly by flooding drains. However, the possibility of changes in the development of organisms cannot be excluded, even though they have not been established. (author) figs., tabs., refs.

  2. Comparison between Brazilian and Portuguese energy sceneries considering the importance of small hydroelectric power plants; Comparacao entre os cenarios energeticos brasileiros e portugueses considerando-se a implantacao de PCH's - Pequenas Centrais Hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Mariotoni, Carlos Alberto [Universidade Estadual de Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mail: cam@fec.unicamp.br; Mauad, Frederico Fabio [Sao Paulo Univ., Sao Carlos, SP (Brazil). Escola de Engenharia. Dept. de Hidraulica e Saneamento

    2000-07-01

    Both the Brazilian and the Portuguese energy systems have been subject of several transformations along the last years. That happened mainly because the re-definition of the electric sectors what makes possible the flexibility of the energy commercialization. There is another important point to be mentioned what is related to the end of the market monopoly before established by ELETROBRAS - Brazilian Electricity Generation Board and by EDP - Electricity of Portugal, determining a new relationship among the energy produces and consumers. A free market law to the energy sellers and buyers has been introduced. Therefore the businessman have been stimulated to invest in new energy sources and new energy power plants to get bigger profits as well as the consumers have been pushed to fight for lower prices and better qualities. Both the Brazilian and Portuguese Governments must keep the decision power to establish the national energy plans to get the country economic targets and to avoid the economic abuses and cartelization. The discussion presented aims to analyze the importance of the small hydroelectric power plants in both the Brazilian and the Portuguese electric systems considering the economic aspects and the social and environmental impacts. The recent modifications established by both national agencies of energy regulations: ANEEL (Brazil) - National Agency of Electric Power Companies and INAG (Portugal) - National Institute of Water, have been discussed in this paper. (author)

  3. Assessment of spermatogenesis and plasma sex steroids in a seasonal breeding teleost: a comparative study in an area of influence of a tributary, downstream from a hydroelectric power dam, Brazil.

    Science.gov (United States)

    Domingos, Fabricio F T; Thomé, Ralph G; Arantes, Fabio P; Castro, Antonio Carlos S; Sato, Yoshimi; Bazzoli, Nilo; Rizzo, Elizete

    2012-12-01

    River damming and building of hydroelectric power plants interrupt the reproductive migration routes and change the major physicochemical parameters of water quality, with drastic consequences for populations of migratory fishes. The goal of this study was to evaluate proliferation and cell death during spermatogenesis and serum profiles of sex steroids in Prochilodus argenteus, from the São Francisco River, downstream from the Três Marias Dam. A total of 257 adult males were caught quarterly during a reproductive cycle in two sites: the first 34 km of the river after the dam (site 1) and the second 34-54 km after the dam (site 2), after the confluence with a tributary, the Abaeté River. Seasonal changes in the testicular activity associated with morphometric analyses of germ cells as well as proliferation and testicular apoptosis support a more active spermatogenesis in fish from site 2, where higher levels of sex steroids and gonadosomatic index (GSI) were also found. In site 1, fish presented low serum levels of testosterone, 17β-estradiol and 17α-hydroxyprogesterone and a low GSI during gonadal maturation. Spermatogonial proliferation (PCNA) and apoptosis (TUNEL) were more elevated in fish from site 1, but spermatocytes were mainly labelled in fish from site 2. Overall, these data demonstrate changes in testicular activity and plasma sex steroids in a neotropical teleost fish living downstream from a hydroelectric dam, supplying new data on fish reproduction in regulated rivers. Moreover, morphometric analyses associated with sex steroids profiles provide reliable tools to assess fish spermatogenesis under environmental stress conditions.

  4. Implantation of hydroelectric power plants and the environmental licensing: the importance of the articulation among the electrical and environment sectors in Brazil; A implantacao de usinas hidreletricas e o processo de licenciamento ambiental: a importancia da articulacao entre os setores eletrico e de meio ambiente no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Facuri, Micheline Ferreira

    2004-07-01

    Hydroelectric power plants stand for the main generation source in Brazil. The basis of the national generator park installed capacity is the exploration of hydraulic potency when the Brazilian energetic die is observed. The atmosphere that the Brazilian electric sector is found now asks for new generator units. In this sense, it would decrease energy offer deficit risk, which collaborates to the electric energy offer expansion effort. This research aims to join and to comment on a group of data and information regarding to the process of implantation of hydroelectric power plants already bid. It includes up to date data on hydroelectric power plants bid since 1996. This data describe the main implications found in the enterprises that are late in their schedules. It shows that the greater the environmental management instruments incorporation in hydroelectric projects planning process, the greater the possibility of new hydraulic generation enterprises with better quality of environmental studies implantation. In this way, it makes even better the process of environmental licensing that could occur in a more adequate deadline. As a result, 28 - out of 54 - enterprises bid are found with environmental problems, which represent 43.30% of bestowed potency. It is possible to infer, thus, that there is a need of more interaction between the electric and the environmental sectors. After analyzing the results, it is concluded that the generation enterprises environmental licensing has been worrying the electric sector agents. This happens due to the need of refinement on environmental studies or due to the need of bureaucracy to get licenses - mainly regarding to judicial actions and environmental issues. Finally, the adequate identification of environmental licensing drags allows a more efficient process to hydroelectric power plants implantation, which generates more consistent and faster results. (author)

  5. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project...

  6. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All...

  7. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy... Power Act), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal...

  8. Forecasting volatility of wind power production

    OpenAIRE

    Zhiwei Shen; Matthias Ritter

    2015-01-01

    Abstract: The increasing share of wind energy in the portfolio of energy sources highlights its uncertainties due to changing weather conditions. To account for the uncertainty in predicting wind power production, this article examines the volatility forecasting abilities of different GARCH-type models for wind power production. Moreover, due to characteristic features of the wind power process, such as heteroscedasticity and nonlinearity, we also investigate the use of a Markov regime-switch...

  9. Evaluation of environmental impact caused by the implementation of small hydroelectric power plants: a study concerning biotic aspects, water quality and public health; Avaliacao de impacto ambiental ocasionado pela implantacao de pequenos aproveitamentos: um estudo sobre aspectos bioticos, qualidade da agua e saude publica

    Energy Technology Data Exchange (ETDEWEB)

    Carneiro, P.R.F. [Monasa Consultoria e Projetos, Belo Horizonte, MG (Brazil)

    1987-12-31

    This work describes the experience in the environmental impacts evaluation during the implementation phase of small scales hydroelectric power plants in Paraiba River bay, Southeast Brazil, performed by ELETROBRAS, the Brazilian electric power holding company, government owned and controlled. The methodology is described. The main aspects studied were: vegetation; aquatic fauna; terrestrial fauna; water quality, and public health. Results are presented 9 refs., 5 figs.

  10. Building Resiliency to Water Risks in Power Production in a Changing World

    Science.gov (United States)

    Dell, J.

    2012-12-01

    This presentation covers the drivers and mechanisms to address water risks in power generation in the face of growing population, long term climate change and short term climate variability, and initiatives to promote renewable and low carbon energy. The projected impacts of climate change will amplify seasonal energy use patterns and increase water risks that threaten the security of energy supply. Water issues are becoming an increasingly critical factors in energy production operations and development plans. Aquatic species protection efforts have resulted in the proposal of new cooling regulations on both freshwater and seawater. Droughts pose problems for hydroelectric power and cooling operations in thermal power plants. During droughts or heat waves, surface water temperature can increase sufficiently to prevent the plant from discharging the water back into waterways in compliance with regulatory temperature limits. And, when river, lake or reservoir water levels fall near or below the plant's water intake level, operations must be curtailed. The need for resiliency to water risks in energy production is exemplified in recent challenges to power plant siting and incidents at existing power production facilities. Water concerns in new operations' permitting and in power production interruptions are prevalent worldwide. Examples of power plant siting and operations impacted by water issues in the past five years will be presented. Actions to adapt to the physical changes and demographic trends are warranted to secure energy supply and promote resiliency in power production. Adaptation measures can cost-effectively reduce risks and prospects of negative consequences for energy supply and use. Examples of adaptation actions will be presented for the key water challenges in climate resilient power production.

  11. The further environmental development of Polyphyto Hydroelectric Project reservoir in Kozani prefecture and its contribution to the life quality improvement

    Science.gov (United States)

    Saounatsou, Chara; Georgi, Julia

    2014-08-01

    The Polyphyto Hydroelectric Project was constructed in 1974 and it has been operating since on the Aliakmonas River, Kozani prefecture, by the Greek Public Power Corporation. The construction of the Ilarion Hydroelectric Project, upstream from the Polyphyto Reservoir, has been recently completed and will start operating in the near future. Apart from hydroelectric power production, the Polyphyto reservoir provides flood control to the areas below the Polyphyto dam. It is also used to manage water provision to the city of Thessaloniki and adjacent agricultural plain, providing at the same time cooling water to the Thermo Electric Projects in Ptolemaida. The Polyphyto reservoir has potential for further development as an economic fulcrum to the region in which is located. The Kozani and Servia-Velvendos Municipalities have proceeded to the construction of several touristic, nautical - athletic and fishing projects. In order to promote such developments, while preserving the artificial wetland, flora and fauna of the Polyphyto Reservoir, it is important to reduce the fluctuation of the reservoir elevation which according to its technical characteristics is 21m. The aim of this paper is to propose the combined operation of the two Hydroelectric Project reservoirs to satisfy all the present Polyphyto Hydroelectric Project functions and to reduce the annual fluctuation of the Polyphyto Reservoir. The HEC-5, Version 8 / 1998 computer model was used in our calculations, as developed by the Hydrologic Engineering Center (HEC) of the US Army Corps of Engineers for reservoir operation simulation. Five possible operation scenarios are tested in this paper to show that the present fluctuation of the Polyphyto Reservoir can be reduced, with some limitations, except during dry weather periods.

  12. The small-scale hydroelectric power plant project 'Les Esserts' in Boudry, Switzerland - Feasibility study and preliminary planning; Centrale des Esserts a Boudry. Etude de faisabilite et avant-projet detaille

    Energy Technology Data Exchange (ETDEWEB)

    Roelli, P.; Croci, S.; Ernst, J.-R.

    2004-07-01

    This report describes in details the project of the installation of a small-scale hydroelectric power plant on the river Areuse in Switzerland. Located on a 4 m high waterfall the plant includes a 10-13 m{sup 3}/s Kaplan turbine, which should deliver roughly 1.6 GWh/year for an installed power of about 500 kVA. The authors insist on the ecological aspect of the project. The plant will be built underground; the river track will be practically unchanged and the existing fish ladder maintained. The report includes maps and pictures of the site as well as technical drawings of the installation. An economic analysis of the project is presented and its viability is discussed. Finally, the authors state that the energy produced by this plant will certainly be certified under one of the Swiss labels 'naturemade star' or 'naturemade basic', in the framework of the federal government's promotion of renewable energy sources.

  13. Integration of the hydroelectric power plants of Baixo Xingu, Tapajos and Medio Tocantins rivers to the interconnected Brazilian system; Integracao das UHE`s do Baixo Xingu, Tapajos e Medio Tocantins ao sistema interligado brasileiro

    Energy Technology Data Exchange (ETDEWEB)

    Lopes, J.A.M.; Abdo, J.M.M.; Vieira Filho, O.; Quijano, J.C.M.; Avila, F.T.; Steiner, A.C. [ELETRONORTE, Brasilia, DF (Brazil)

    1990-12-31

    Very big hydroelectric resources are placed in the north region of Brazil. Studies accomplished by ELETRONORTE, the utility responsible for the electric power generation and transmission within this region, have shown that the estimated average power available only in some big rivers like Xingu, Tapajos, and Tocantins is 29,500 MW. Even with the perspective of large industries planned to be implemented in the mentioned region, a big part of this available energy would not be absorbed. However, considering the lack of comparative energy sources in the other regions like southeast and northeast, the possibility of exporting electrical energy to these regions should be investigated. This paper deals with the technical and economical feasibility of integrating the north generations to the other electrical systems. The main results shown are the associated transmission evaluation, including the final costs of the energy to be delivered. Many other aspects as environmental impacts along the preionized routes, and undertakings to be held within the evolved regions, are also presented. (author). 4 refs., 5 tabs., 3 figs

  14. Low head hydroelectric installation. Installation hydroelectrique de basse chute

    Energy Technology Data Exchange (ETDEWEB)

    Megnint, L.

    1987-08-04

    A low head hydroelectric installation, in particular for tidal power plant use, is intended to function at variable head heights which can descend to near-zero values. While the head height is lower than a determined value, inferior to at least half the nominal head, the turbomachinery is made to turn at a speed lower than the synchronizing speed and bringing its output near the middle of the output curve. A frequency converter is inserted between the electric generator and the power network, said converter being constructed for a power in any case inferior to at least half of the nominal power. The invention also concerns a process for obtaining at the outlet of a hydraulic turbine an optimal output under a defined, nominal head or output, corresponding to a nominal power of a low head hydroelectric installation and for a rotation speed corresponding to the speed of synchronization with the frequency of a power network.

  15. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... From the Federal Register Online via the Government Publishing Office ] DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Sutton Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a...

  16. Environmental licensing for the implementation of small hydroelectric power plants: analysis and optimization proposals for Minas Gerais state, Brazil; Licenciamento ambiental para implantacao de pequenas centrais hidreletricas: analise e propostas de otimizacao para Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Programa de Pos-graduacao em Engenharia da Energia], e-mail: adriana@unifei.edu.br; Dupas, Francisco Antonio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: dupas@unifei.edu.brT

    2004-07-01

    This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants (SHPP). Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. It also highlights the importance of environmental zoning as a tool of environmental management for the procedure to obtain these licenses. The results show that 80% of the cases, the institutions do not respect the deadlines, 40% of the studies presented by the enterprises are insufficient, 60% there is lack of human resource and technical capacities of the environment institutions, and 80% non-fulfilment of the laws and non-integration of the institutions. Finally, the study concludes that the difficulties to obtain these licenses are based on the facts mentioned which are, the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, it is suggested that deadlines should be imposed for the institutions and the enterprises. There should be training, fund raising for the hiring of technicians, fulfillment of the law and above all, transparency in order to supply the electrical energy demand and guarantee the sustainable development. (author)

  17. Analysis of the impact of connecting a larger number of small hydroelectric power plants to the short-circuit currents values and relay protection system of distribution network

    Directory of Open Access Journals (Sweden)

    Sučević Nikola

    2017-01-01

    Full Text Available In this paper the influence of a large number of small hydro power plants on the short-circuit currents is analysed, as well as the operation of the relay protection system within the real distribution network in Serbia. The necessary modification of the existing protection functions, as well as the implementation of the new proposed protection functions, are presented and discussed. Network modeling and analysis are performed using the program tool DIgSILENT PowerFactory.

  18. Confidence intervals for annual wind power production******

    Directory of Open Access Journals (Sweden)

    Bensoussan Alain

    2014-01-01

    Full Text Available Wind power is an intermittent resource due to wind speed intermittency. However wind speed can be described as a stochastic process with short memory. This allows us to derive a central limit theorem for the annual or pluri-annual wind power production and then get quantiles of the wind power production for one, ten or twenty years future periods. On the one hand, the interquantile spread offers a measurement of the intrinsic uncertainties of wind power production. On the other hand, different quantiles with different periods of time are used by financial institutions to quantify the financial risk of the wind turbine. Our method is then applied to real datasets corresponding to a French wind turbine. Since confidence intervals can be enhanced by taking into account seasonality, we present some tools for change point analysis on wind series.

  19. Reactive power predispatch in the economical dispatch of multimodal hydroelectric systems; Predespacho de potencia reactiva en el despacho economico de sistemas hidrotermicos multinodales

    Energy Technology Data Exchange (ETDEWEB)

    Dona, Victor M.; Hoese, Alejandro; Vargas, Alberto [Universidad Nacional de San Juan (Argentina). Instituto de Energia Electrica]. E-mail: vdona@iee.unsj.edu.ar

    2001-07-01

    The reactive power dispatch in generators and compensation equipment is necessary to the effects of maintaining an appropriate voltage level in the entire electric system. The lack of an appropriate dispatch programming for reactive power, can implies in a forced and not programmed operation of generator units. This contemplates in an unfavorable way in the operation costs when an entire optimization period is analyzed. This paper presents an associated predispatch proposal of generator units to the voltage-reactive power control needs, which is accomplished within the economical dispatch calculation during the operation programming process of an electric system. Finally, it is shown the main methodological aspects and results related to a real network.

  20. Renewable energy: diagnostic of the small hydroelectric power plants; Energia renovavel: diagnostico da geracao de eletricidade em pequenas centrais hidreletricas no Estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Moura, Gustavo Nikolaus Pinto de [Universidade Federal do Rio de Janeiro (COPPE/UFRJ), RJ (Brazil). Coordenacao dos Programas de Pos-Graduacao de Engenharia. Programa de Planejamento Energetico], e-mail: gustavonikolaus@ppe.ufrj.br; Santi, Auxilidadora Maria Moura [Universidade Federal de Ouro Preto (UFOP), MG (Brazil). Area de Planejamento Energetico], e-mail: auxiliadora@em.ufop.br

    2008-07-01

    This paper presents a diagnostic of the power generation in small-scale electric power generation at the state of Minas Gerais, Brazil, considering the legislation, the environmental aspects, the hydro resources and the agents of the electric sector to which the electricity is destined. The diagnostic turn available important information on the process of implantation of infra-structure which are under development at the state of Minas Gerais, Brazil, where the participation of the SHP amounts 402375 k W generated in 78 SHP under operation. There are nine SHP under construction and 48 under granting process.

  1. Atmospheric science and power production

    Energy Technology Data Exchange (ETDEWEB)

    Randerson, D. (ed.)

    1984-07-01

    This is the third in a series of scientific publications sponsored by the US Atomic Energy Commission and the two later organizations, the US Energy Research and Development Adminstration, and the US Department of Energy. The first book, Meteorology and Atomic Energy, was published in 1955; the second, in 1968. The present volume is designed to update and to expand upon many of the important concepts presented previously. However, the present edition draws heavily on recent contributions made by atmospheric science to the analysis of air quality and on results originating from research conducted and completed in the 1970s. Special emphasis is placed on how atmospheric science can contribute to solving problems relating to the fate of combustion products released into the atmosphere. The framework of this book is built around the concept of air-quality modeling. Fundamentals are addressed first to equip the reader with basic background information and to focus on available meteorological instrumentation and to emphasize the importance of data management procedures. Atmospheric physics and field experiments are described in detail to provide an overview of atmospheric boundary layer processes, of how air flows around obstacles, and of the mechanism of plume rise. Atmospheric chemistry and removal processes are also detailed to provide fundamental knowledge on how gases and particulate matter can be transformed while in the atmosphere and how they can be removed from the atmosphere. The book closes with a review of how air-quality models are being applied to solve a wide variety of problems. Separate analytics have been prepared for each chapter.

  2. Powers of a product of commutators as products of squares

    Directory of Open Access Journals (Sweden)

    Alireza Abdollahi

    2004-01-01

    Full Text Available We prove that for any odd integer N and any integer n>0, the Nth power of a product of n commutators in a nonabelian free group of countable infinite rank can be expressed as a product of squares of 2n+1 elements and, for all such odd N and integers n, there are commutators for which the number 2n+1 of squares is the minimum number such that the Nth power of its product can be written as a product of squares. This generalizes a recent result of Akhavan-Malayeri.

  3. Feasibility assessment of the water energy resources of the United States for new low power and small hydro classes of hydroelectric plants: Main report and Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Douglas G. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Reeves, Kelly S. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Brizzee, Julie [Idaho National Lab. (INL), Idaho Falls, ID (United States); Lee, Randy D. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Carroll, Gregory R. [Idaho National Lab. (INL), Idaho Falls, ID (United States); Sommers, Garold L. [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MWa) or small hydro (between 1 and 30 MWa) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  4. Feasibility Assessment of Water Energy Resources of the United States for New Low Power and Small Hydro Classes of Hydroelectric Plants

    Energy Technology Data Exchange (ETDEWEB)

    Douglas G. Hall

    2006-01-01

    Water energy resource sites identified in the resource assessment study reported in Water Energy Resources of the United States with Emphasis on Low Head/Low Power Resources, DOE/ID-11111, April 2004 were evaluated to identify which could feasibly be developed using a set of feasibility criteria. The gross power potential of the sites estimated in the previous study was refined to determine the realistic hydropower potential of the sites using a set of development criteria assuming they are developed as low power (less than 1 MW) or small hydro (between 1 and 30 MW) projects. The methodologies for performing the feasibility assessment and estimating hydropower potential are described. The results for the country in terms of the number of feasible sites, their total gross power potential, and their total hydropower potential are presented. The spatial distribution of the feasible potential projects is presented on maps of the conterminous U.S. and Alaska and Hawaii. Results summaries for each of the 50 states are presented in an appendix. The results of the study are also viewable using a Virtual Hydropower Prospector geographic information system application accessible on the Internet at: http://hydropower.inl.gov/prospector.

  5. Electricity production by advanced biomass power systems

    Energy Technology Data Exchange (ETDEWEB)

    Solantausta, Y. [VTT Energy, Espoo (Finland). Energy Production Technologies; Bridgwater, T. [Aston Univ. Birmingham (United Kingdom); Beckman, D. [Zeton Inc., Burlington, Ontario (Canada)

    1996-11-01

    This report gives the results of the Pyrolysis Collaborative Project organized by the International Energy Agency (IEA) under Biomass Agreement. The participating countries or organizations were Canada, European Community (EC), Finland, United States of America, and the United Kingdom. The overall objective of the project was to establish baseline assessments for the performance and economics of power production from biomass. Information concerning the performance of biomass-fuelled power plants based on gasification is rather limited, and even less data is available of on pyrolysis based power applications. In order to gain further insight into the potential for these technologies, this study undertook the following tasks: (1) Prepare process models to evaluate the cost and performance of new advanced biomass power production concepts, (2) Assess the technical and economic uncertainties of different biomass power concepts, (3) Compare the concepts in small scale and in medium scale production (5 - 50 MW{sub e}) to conventional alternatives. Processes considered for this assessment were biomass power production technologies based on gasification and pyrolysis. Direct combustion technologies were employed as a reference for comparison to the processes assessed in this study. Wood was used a feedstock, since the most data was available for wood conversion

  6. M-C Power`s product design and improvement

    Energy Technology Data Exchange (ETDEWEB)

    Laurens, R.M.; Petraglia, V.J.

    1995-08-01

    The sole mission of M-C Power is the development and subsequent commercialization of molten carbonate fuel cell (MCFC) stacks. These MCFC stacks are based on the Internally Manifolded Heat EXchanger plate design developed by the Institute of Gas Technology. Integration of the MCFC stack into a commercially viable power plant is the mission of the IMHEX{reg_sign} team. The team is composed of leaders in the packaging and design of power generation equipment, including fuel cell technology, and includes Stewart & Stevenson, Bechtel, The Institute of Gas Technology and M-C Power. In an effort to succeed in their respective missions, M-C Power and the IMHEX{reg_sign} team have developed a commercialization program. At the present time the team is making the transition from Phase I (Technology Development) to Phase II (Product Design & Improvement) of the program. Phase II`s objective is a commercially viable (cost effective and technologically reliable) MCFC power plant ready for market by the turn of the century.

  7. Environmental impacts of hydroelectric power and other anthropogenic developments on the hydromorphology and ecology of the Durance channel and the Etang de Berre, southeast France.

    Science.gov (United States)

    Warner, Robin F

    2012-08-15

    The generation of electricity through hydropower can, along with other anthropogenic activities, degrade river hydromorphology and ecosystems. In this case, water for power generation is diverted from the River Durance to a canal, which services a chain of 17 power stations, with the lower three being in the catchment of the Etang de Berre. This means that excess water and sediments are discharged into the salt-water lagoon with enormous consequences for ecosystems there. This paper summarizes the impacts of HEP and other human activities on both the river and lagoonal systems. It also considers agency and government attempts to understand and counter the degradation of these systems, both to date and in the future, with the latter catering for the potential impacts of future human development and global warming. Copyright © 2012 Elsevier Ltd. All rights reserved.

  8. Innovation in hydroelectric power plant design in early twentieth century. Casto Fernández-Shaw's Engineering Architecture in La Jándula dam

    Directory of Open Access Journals (Sweden)

    A. B. Berrocal Menárguez

    2017-09-01

    Full Text Available The power plant location in the first hydroelectrial dams was a relevant issue at the end of XIX century and early XX. Different solutions were tried, some of them with very interesting aesthetics results and hydraulic and structural implications. Such is the case of La Jándula dam, inaugurated in 1930, that includes the power station inside the dam. This article examines the possible national and international inspirations of this singular solution, corroborating the hypothesis of its unprecedented nature. The collaboration of the architect Casto Fernández-Shaw in the design and integration of the engine room was decisive, because it achieved a result of an aesthetic quality and formal expressiveness unprecedented in a work of hydraulic engineering, as well as the birth of a style Shaw himself defined as architectural engineering.

  9. System of performance indicators for management of a hydroelectric power plant; Rede de indicadores de desempenho para gestao de uma usina hidreletrica

    Energy Technology Data Exchange (ETDEWEB)

    Bandeira, Anselmo Alves

    1997-07-01

    This thesis addresses the development of a management system for manufacturing, based upon a performance measurement system, applied to a case study of the strategy of an electric energy-producing company. By defining performance parameters, determining the critical success factors and applying a gaps analysis, it is possible to identify the areas where the company ought to channel its efforts to improve its productive performance. The thesis selects indicators associated with the following parameters of efficacy, efficiency, productivity, quality, innovation and profitability, in order to evaluate the performance of its different levels of operation. A practical application of a performance measurement system, which was undertaken during the period of observation, is presented at the end of this thesis. It is believed that the theoretical content of this thesis can be easily adapted to the situation of other companies. (author)

  10. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP Ombla near Dubrovnik (Croatia

    Directory of Open Access Journals (Sweden)

    T. Roje-Bonacci

    2013-08-01

    Full Text Available The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia. Its outlet is at an altitude of 2.5 m above sea level (m a.s.l. and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s−1 and 117 m3 s−1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981–2011, is 24.05 m3 s−1. Before massive civil engineering work which took place during 1968–1980, the mean annual discharge was 28.35 m3 s−1. There is a project for construction of the hydro-electric power plant (HEPP Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1 severe spring discharge change; (2 unpredictable regional groundwater redistribution; (3 threatening of endemic fauna; (4 induced seismicity; (5 induced sinkholes; (6 occurrence of landslides; (7 conflict regarding internationally shared karst aquifers; (8 intensification of karst flash floods; (9 sea water intrusion in coastal karst aquifer; etc.

  11. The possible negative consequences of underground dam and reservoir construction and operation in coastal karst areas: an example of the hydro-electric power plant (HEPP) Ombla near Dubrovnik (Croatia)

    Science.gov (United States)

    Roje-Bonacci, T.; Bonacci, O.

    2013-08-01

    The Ombla Spring represents a typical abundant coastal karst spring located in the vicinity of the town of Dubrovnik (Croatia). Its outlet is at an altitude of 2.5 m above sea level (m a.s.l.) and the water from it immediately flows into the Adriatic Sea. The minimum and maximum measured discharges are 3.96 m3 s-1 and 117 m3 s-1, respectively. The Trebišnjica River traverses through its catchment. The mean annual discharge, after the canalization of over 60 km of its watercourse with spray concrete (in the time span 1981-2011), is 24.05 m3 s-1. Before massive civil engineering work which took place during 1968-1980, the mean annual discharge was 28.35 m3 s-1. There is a project for construction of the hydro-electric power plant (HEPP) Ombla, which will exclusively use groundwater from the Ombla Spring karst aquifer. The underground dam will be constructed about 200 m behind the existing karst spring outflow in the karst massif, by injecting a grout curtain. The top of the grout curtain is planned to be at an altitude of 130 m a.s.l. This karst system is complex, sensitive, vulnerable and ecologically extremely valuable. The grout curtain, as well as the HEPP Ombla development, could lead to extremely dangerous technical and environmental consequences. In this paper some probable, negative consequences of the HEPP Ombla construction and development are explained. The HEPP Ombla could result in many large and hard-to-predict negative consequences which are specific for this particular HEPP, for example (1) severe spring discharge change; (2) unpredictable regional groundwater redistribution; (3) threatening of endemic fauna; (4) induced seismicity; (5) induced sinkholes; (6) occurrence of landslides; (7) conflict regarding internationally shared karst aquifers; (8) intensification of karst flash floods; (9) sea water intrusion in coastal karst aquifer; etc.

  12. Evaluation of the environmental licensing process for small hydroelectric power plants in Minas Gerais state, Brazil; Avaliacao do processo de licenciamento ambiental para pequenas centrais hidreletricas no estado de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Pedreira, Adriana Coli

    2004-07-01

    The present situation of the environmental licensing process have been slow and complicated, in relation to the current conception of the sustainable environmental development in the country. The enterprises and impacting activities are being discussed and analysed through a great number of environmental laws and specific laws to each enterprise. These laws along with the inexperience of the enterprises and of the many institutions involved in the process are an obstacle to the development. This document presents the legal and institutional aspects of the environmental licensing for the implementation of small hydroelectric power plants. Laws and doctrine related to the topic were researched and concluded for Minas Gerais State with the help of a survey with the enterprises and institutions involved in the process to find out the difficulties that influence the delay of the analysis of the SHPP. The results show that the main barriers are the non-application of the CONAMA resolution 279/2001 to the SHPP, undetermined inspection criteria, excess of environmental programs, technical incapacity, lack of financial resources, non-integration of the institutional organs, the building of SHPP in permanent preservation area, project interfering in the fish fauna, studies an environmental impact with then reports and public audiences. Finally, concludes that the difficulties are based on the non-integration of the institutions and also, being recent, on the inexperience of the actors involved. Therefore, the study suggests on increase of the technical body in the institutions and training of their analysts; hiring of specialized consultancy, implantation of an environmental integrated system, social communication program in the planning phase, fulfillment of the CONAMA resolution 279/2001; integration of public ministry representatives in the licensing organs; application of planning and zoning, deadlines and legal imposition of these deadlines in order to supply the

  13. Use of social communication as a tool for environmental licensing of small-scale hydroelectric power plants; Uso da comunicacao social como instrumento para o licenciamento ambiental de PCH - pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Tiago Filho, Geraldo Lucio [Universidade Federal de Itajuba (UNIFEI), MG (Brazil). Inst. de Recursos Naturais], e-mail: tiago@unifei.edu.br; Galhardo, Camila Rocha [Centro Nacional de Referencia em Pequenas Centrais Hidreletricas (CERPCH), MG (Brazil)], e-mail: pchnoticias@unifei.edu.br

    2006-07-01

    The present work intends to study the process of environmental licensing of the Small ones Central Hydroelectric (PCHs) through the rising of the legal framework of the referred process and to analyze the application of tools of social communication in the mitigation of the social impacts in the zone of influence of the enterprise. Through the analysis of the critical points in the environmental licensing of small hydroelectric uses and evaluation of communication actions taking in consideration the environmental costs for the enterprise. (author)

  14. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Fourth Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    At the end of 1983, the number of signed contracts and letter agreements for cogeneration and small power production projects was 305, with a total estimated nominal capacity of 2,389 MW. Of these totals, 202 projects, capable of producing 566 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration, solid waste, or biomass projects had signed 101 contracts with a potential of 1,408 MW. In total, 106 contracts and letter agreements had been signed with projects capable of producing 1,479 MW. PG and E also had under active discussion 29 cogeneration projects that could generate a total of 402 MW to 444 MW, and 13 solid waste or biomass projects with a potential of 84 MW to 89 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 28, with a generating capability of 618 MW. Also, discussions were being conducted with 14 wind farm projects, totaling 365 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 8 other small wind projects under active discussion. There were 59 hydroelectric projects with signed contracts and a potential of 146 MW, as well as 72 projects under active discussion for 169 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E was planning to construct. Table B displays the above information. In tabular form, in Appendix A, are status reports of the projects as of December 31, 1983.

  15. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission First Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the First Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 322, with a total estimated nominal capacity of 2,643 MW. Of these totals, 215 projects, capable of producing 640 MW, are operational. A map indicating the location of operational facilities under contract with PG and E is provided. Developers of cogeneration, solid waste, or biomass projects had signed 110 contracts with a potential of 1,467 MW. In total, 114 contracts and letter agreements had been signed with projects capable of producing 1,508 MW. PG and E also had under active discussion 35 cogeneration projects that could generate a total of 425 MW to 467 MW, and 11 solid waste or biomass projects with a potential of 94 MW to 114 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. There were 7 solar projects with signed contracts and a potential of 37 MW, as well as 5 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 32, with a generating capability of 848 MW. Also, discussions were being conducted with 18 wind farm projects, totaling 490 MW. There were 101 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 6 other small wind projects under active discussion. There were 64 hydroelectric projects with signed contracts and a potential of 148 MW, as well as 75 projects under active discussion for 316 MW. In addition, there were 31 hydroelectric projects, with a nominal capacity of 187 MW, that Pg and E was planning to construct.

  16. Scenarios of hydrogen production from wind power

    Energy Technology Data Exchange (ETDEWEB)

    Klaric, Mario

    2010-09-15

    Since almost total amount of hydrogen is currently being produced from natural gas, other ways of cleaner and 'more renewable' production should be made feasible in order to make benchmarks for total 'hydrogen economy'. Hydrogen production from wind power combined with electrolysis imposes as one possible framework for new economy development. In this paper various wind-to-hydrogen scenarios were calculated. Cash flows of asset based project financing were used as decision making tool. Most important parameters were identified and strategies for further research and development and resource allocation are suggested.

  17. Feasibility study for the retrofitting a small hydroelectric power station at the mill of Noiraigue, Switzerland; Projet de rehabilitation d'une centrale hydro-electrique au moulin de Noiraigue. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    Choulot, A.; Chenal, R.; Denis, V. [MHyLab, Montcherand (Switzerland); Chuat, O. [RWB SA, Cernier (Switzerland)

    2006-07-01

    For the time being, the old mill on the left bank of the river Noiraigue, Switzerland is equipped with a small turbine of only a few kW. The present study investigates the technical and economical possibilities for maximizing the electric power production at the site. Two variants were studied: variant A retains the existing construction at the site and comprises a single turbine with a maximum electric power output of 70 kW. The annual energy production would be 348'300 kWh and the production cost 0.13 CHF/kWh. Variant B includes important modifications in the construction - especially the dam and the channels. Two turbines with a total maximum power output of 118 kW are foreseen. The annual energy production would be 448'500 kWh and the production cost 0.15 CHF/kWh. Due to these findings, variant A is preferred and proposed for realization.

  18. Hydroelectric power in Hawaii: a reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-01

    The major conclusion of this study is that hydropower resources in the State of Hawaii are substantial, and they offer the potential for major increases in hydropower generating capacity. Hydropower resources on all islands total about 50 megawatts of potential generating capacity. Combined with the 18 megawatts of existing hydropower capacity, hydropower resources potentially could generate about 307 million kilowatt-hours of electric energy annually. This represents about 28% of the present combined electricity needs of the Neighbor Islands - Kauai, Molokai, Maui, and the Big Island. Hydropower resources on Kauai equal 72% of that island's electricity needs; on Molokai, 40%; on the Big Island, 20%; and on Maui, 18%. The island of Oahu, however, has only small hydropower resources, and could only generate a negligible portion of its electricity needs from this energy source. Existing and future (potential) hydropower capacities are summarized, and annual outputs for each island are estimated. Future hydropower facilities are subdivided into two categories, which show how much of the potential capacity is being actively considered for development, and how much is only tentatively proposed at the time.

  19. improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    HOD

    conversion involves a hydraulic turbine which converts the kinetic energy of the flowing water into mechanical work that produce a torque. A dynamo then converts the torque thus produced into electricity [1]. The operation of a generator is based on Faraday's principle of electromagnetism. Faraday propounded that when a.

  20. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  1. Monitoring marginal erosion in hydroelectric reservoirs with terrestrial mobile laser scanner

    Directory of Open Access Journals (Sweden)

    A. M. G. Tommaselli

    2014-06-01

    Full Text Available Marginal erosions in reservoirs of hydroelectric plants have caused economic and environmental problems concerning hydroelectric power generation, reduction of productive areas and devaluing land parcels. The real extension and dynamics of these erosion processes are not well known for Brazilian reservoirs. To objectively assess these problems Unesp (Univ Estadual Paulista and Duke Energy are developing a joint project which aims at the monitoring the progression of some erosive processes and understanding the causes and the dynamics of this phenomenon. Mobile LASER scanning was considered the most suitable alternative for the challenges established in the project requirements. A MDL DynaScan Mobile LASER M150 scanner was selected which uses RTK for real time positioning integrated to an IMU, enabling instantaneous generation of georeferenced point clouds. Two different reservoirs were choose for monitoring: Chavantes (storage plant and Rosana (run-of-river plant, both in the Paranapanema River, border of São Paulo and Paraná States, Brazil. The monitoring areas are scanned quarterly and analysed with base on the point cloud, meshes, contours and cross sections. Cross sections are used to visualize and compute the rate and the dynamics of erosion. Some examples and quantitative results are presented along with an analysis of the proposed technique. Some recommendations to improve the field work and latter data processing are also introduced.

  2. DISTRIBUTED ELECTRICAL POWER PRODUCTION SYSTEM AND METHOD OF CONTROL THEREOF

    DEFF Research Database (Denmark)

    2010-01-01

    The present invention relates to a distributed electrical power production system wherein two or more electrical power units comprise respective sets of power supply attributes. Each set of power supply attributes is associated with a dynamic operating state of a particular electrical power unit....

  3. Tuttle Creek Hydroelectric Project feasibility assessment report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-03-01

    The results are presented of a feasibility assessment study to determine if hydroelectric generation could be developed economically at the Corps of Engineers' Tuttle Creek Dam, an existing flood control structure on the Big Blue River near Manhattan, Kansas. The studies and investigations included site reconnaissance, system load characteristics, site hydrology, conceptual project arrangements and layouts, power studies, estimates of construction costs, development of capital costs, economic feasibility, development of a design and construction schedule and preliminary environmental review of the proposed Project. The dependable capacity of the Project as delivered into the existing transmission and distribution network is 12,290 kW and the average annual energy is 56,690 MWh. For the scheduled on-line date of July 1984, the Project is estimated to have a Total Investment Cost of $19,662,000 (equal to $1333/kW installed at that time frame) with an estimated annual cost for the first year of operation of $2,696,000, assuming REA financing at 9.5% interest rate. The Project is considered technically feasible and without any major environmental issues. It shows economic feasibility providing satisfactory financing terms are available. (LCL)

  4. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  5. Strategic wind power trading considering rival wind power production

    DEFF Research Database (Denmark)

    Exizidis, Lazaros; Kazempour, Jalal; Pinson, Pierre

    2016-01-01

    In an electricity market with high share of wind power, it is expected that wind power producers may exercise market power. However, wind producers have to cope with wind’s uncertain nature in order to optimally offer their generation, whereas in a market with more than one wind producers......, uncertainty of rival wind power generation should also be considered. Under this context, this paper addresses the impact of rival wind producers on the offering strategy and profits of a pricemaker wind producer. A stochastic day-ahead market setup is considered, which optimizes the day-ahead schedules...... considering a number of foreseen real-time scenarios. The results indicate that strategic wind producer is more likely to exercise market power having a mid-mean or low-mean forecast distribution, rather than having a high-mean one. Furthermore, it is observed that its offering strategy varies considerably...

  6. The SPES High Power ISOL production target

    Science.gov (United States)

    Andrighetto, A.; Corradetti, S.; Ballan, M.; Borgna, F.; Manzolaro, M.; Scarpa, D.; Monetti, A.; Rossignoli, M.; Silingardi, R.; Mozzi, A.; Vivian, G.; Boratto, E.; De Ruvo, L.; Sattin, N.; Meneghetti, G.; Oboe, R.; Guerzoni, M.; Margotti, A.; Ferrari, M.; Zenoni, A.; Prete, G.

    2016-11-01

    SPES (Selective Production of Exotic Species) is a facility under construction at INFN-LNL (Istituto Nazionale di Fisica Nucleare - Laboratori Nazionali di Legnaro), aimed to produce intense neutron-rich radioactive ion beams (RIBs). These will be obtained using the ISOL (Isotope Separation On-Line) method, bombarding a uranium carbide target with a proton beam of 40MeV energy and currents up to 200μA. The target configuration was designed to obtain a high number of fissions, up to 1013 per second, low power deposition and fast release of the produced isotopes. The exotic isotopes generated in the target are ionized, mass separated and re-accelerated by the ALPI superconducting LINAC at energies of 10AMeV and higher, for masses in the region of A = 130 amu , with an expected rate on the secondary target up to 109 particles per second. In this work, recent results on the R&D activities regarding the SPES RIB production target-ion source system are reported.

  7. Impact of the construction of a hydroelectric power plant on the land cover and use: study of the basin Lajeado Bonito - RS; Impacto da construcao de uma usina hidreletrica no uso e cobertura da terra: estudo da bacia Lajeado Bonito-RS

    Energy Technology Data Exchange (ETDEWEB)

    Tramontina, Juliana; Breunig, Fabio Marcelo [Universidade Federal de Santa Maria (UFSM), RS (Brazil)

    2015-07-01

    This work aims to analyze the impact of the construction of a hydroelectric power plant on land cover and use in Lajeado Bonito-RS watershed. The study evaluated the temporal evolution of land cover and use in the watershed for the period before and after to installation of hydroelectric plant Foz do Chapeco (2009 to 2010). For temporal analysis, two images were interpreted, one orbital image of High Resolution Camera (HRC) onboard of the CBERS-2B, acquired in December 29, 2009. And a high-resolution image obtained from Google Earth application, acquired at December 26, 2010. The land cover and use maps were generated by vector editing SPRING software. We found that the predominant land use related to agriculture and livestock, including bare soil. In 2009 this class accounted for 70.23% of the total area, while it come to represent 61.8% in 2010. At the same time, there was increase of areas with native forest cover, from 27.49% covered by forest in 2009, to 31% in 2010. The results showed that in both 2009 and 2010 years, approximately 49% of permanent preservation area were used inappropriately. (author)

  8. Assessment of the feasibility of recommissioning the French Landing Hydroelectric Facility in Van Buren Township, Michigan. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The results of a study of the feasibility of recommissioning a small, low-head hydroelectric facility in southeastern Michigan are presented. The study concludes that there are several cost-effective designs for recommissioning the site, based on the use of vertical turbines and the sale of power to nearby industrial markets. In terms of the bulk sale of power to the local electric utility, no cost-effective alternatives were found to exist. A major burden on project cost-effectiveness was found to be the relatively large costs for structural repairs to the dam and powerhouse needed to insure safe operation and on adequate service life. From an engineering standpoint it was found that the items of equipment needed to recommission the site are readily available from both US and foreign manufacturers. A variety of hydraulic turbine designs could be successfully adapted to the existing powerhouse, without extensive new construction. It was determined that the production capacity of the facility had an important influence on the cost-effectiveness of the project. A detailed benefit/cost analysis was conducted to identify the optimum facility size in terms of incremental costs and revenues. A detailed environmental assessment using an impact matrix methodology concluded that the development of the facility for hydroelectric generation would have important positive environmental consequences related to improved impoundment and flow management techniques as well as enhanced public safety due to structural repairs to the dam. The institutional and regulatory implications of developing the site for hydroelectric generation were found to be significant but manageable.

  9. An Adaptive Multivariable Control System for Hydroelectric Generating Units

    Directory of Open Access Journals (Sweden)

    Gunne J. Hegglid

    1983-04-01

    Full Text Available This paper describes an adaptive multivariable control system for hydroelectric generating units. The system is based on a detailed mathematical model of the synchronous generator, the water turbine, the exiter system and turbine control servo. The models of the water penstock and the connected power system are static. These assumptions are not considered crucial. The system uses a Kalman filter for optimal estimation of the state variables and the parameters of the electric grid equivalent. The multivariable control law is computed from a Riccatti equation and is made adaptive to the generators running condition by means of a least square technique.

  10. Design Optimization of Spillways at Baihetan Hydroelectric Dam

    OpenAIRE

    Lönn, Jack; Dahl, Oskar

    2016-01-01

    China’s economic prosperity has led to a massive development in the hydropower sector. The Baihetan hydropower project is an ongoing construction and will become the third largest hydroelectric power plant in the world in regards to generating capacity and is projected to be finished in the year 2020.For every fault that an investment this massive has, it will lead to enormous cost and safety risks. Therefore the standards for every detail are especially high to ensure the success of its futu...

  11. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission. Second Quarter 1984

    Energy Technology Data Exchange (ETDEWEB)

    None

    1984-01-01

    At the end of the Second Quarter of 1984, the number of signed contracts and letter agreements for cogeneration and small power production projects was 334, with total estimated nominal capacity of 2,876 MW. Of these totals, 232 projects, capable of producing 678 MW, are operational (Table A). A map indicating the location of operational facilities under contract with PG and E is provided as Figure A. Developers of cogeneration projects had signed 80 contracts with a potential of 1,161 MW. Thirty-three contracts had been signed for solid waste/biomass projects for a total of 298 MW. In total, 118 contracts and letter agreements had been signed with cogeneration, solid waste, and biomass projects capable of producing 1,545 MW. PG and E also had under active discussion 46 cogeneration projects that could generate a total of 688 MW to 770 MW, and 13 solid waste or biomass projects with a potential of 119 MW to 139 MW. One contract had been signed for a geothermal project, capable of producing 80 MW. Two geothermal projects were under active discussion for a total of 2 MW. There were 8 solar projects with signed contracts and a potential of 37 MW, as well as 4 solar projects under active discussion for 31 MW. Wind farm projects under contract numbered 34, with a generating capability of 1,042 MW, Also, discussions were being conducted with 23 wind farm projects, totaling 597 MW. There were 100 wind projects of 100 kW or less with signed contracts and a potential of 1 MW, as well as 7 other small wind projects under active discussion. There were 71 hydroelectric projects with signed contracts and a potential of 151 MW, as well as 76 projects under active discussion for 505 MW. In addition, there were 18 hydroelectric projects, with a nominal capacity of 193 MW, that PG and E was planning to construct. Table B displays the above information. Appendix A displays in tabular form the status reports of the projects as of June 30, 1984.

  12. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  13. High RF Power Production for CLIC

    CERN Document Server

    Syratchev, I; Adli, E; Taborelli, M

    2007-01-01

    The CLIC Power Extraction and Transfer Structure (PETS) is a passive microwave device in which bunches of the drive beam interact with the impedance of the periodically loaded waveguide and excite preferentially the synchronous mode. The RF power produced (several hundred MW) is collected at the downstream end of the structure by means of the Power Extractor and delivered to the main linac structure. The PETS geometry is a result of multiple compromises between beam stability and main linac RF power needs. Another requirement is to provide local RF power termination in case of accelerating structure failure (ON/OFF capability). Surface electric and magnetic fields, power extraction method, HOM damping, ON/OFF capability and fabrication technology were all evaluated to provide a reliable design

  14. The Mansonia genus (diptera: culicidae) and mosquitoes growing in Tucurui hydroelectric power plant (Para - Brazil); O genero Mansonia (diptera: culicidae) e a proliferacao de mosquitos na Usina Hidreletrica de Tucurui

    Energy Technology Data Exchange (ETDEWEB)

    Radei, Wanderli Pedro [Instituto Nacional de Pesquisas da Amazonia (INPA), Manaus, AM (Brazil)

    1996-12-31

    Dams formed for hydroelectric generation normally are invaded by some kinds of aquatic plants. This plants besides the problems in navigation are also responsible for the growing of some mosquitoes. In Tucuri`s dam this plants appeared in so large quantity and make appear mosquitoes and others insects. In this study many captures were making in various places, identifying the mosquitoes and quantifying them from hour to hour. Some considerations were made about the characteristics of this mosquitoes. In conclusion the study shows that the growing of mosquito`s population can cause the appearing of epidemics not knowledge at this places with the population not prepared for them 11 refs., 6 figs., 1 tab.

  15. Hiilangaay Hydroelectric Project – Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Twitchell, Sara [HDR, Omaha, NE (United States); Stimac, Michael [HDR, Omaha, NE (United States); Lang, Lisa [Haida Corporation, Hydaburg, AK (United States); Witwer, Doreen [Haida Corporation, Hydaburg, AK (United States); Jameson, Vincent [Haida Corporation, Hydaburg, AK (United States)

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible to move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy

  16. 30 GHz High Power Production for CLIC

    CERN Document Server

    Syratchev, I V

    2006-01-01

    The CLIC Power Extraction and Transfer Structure (PETS) is a passive microwave device in which bunches of the drive beam interact with the impedance of the periodically loaded waveguide and excite preferentially the synchronous TM01 mode at 30 GHz. The RF power produced (several hundred MW) is collected at the downstream end of the structure by means of the Power Extractor and conveyed to the main linac structure. The PETS geometry is a result of multiple compromises between beam stability along a single decelerator sector (600 m) and the active length of the structure to match the main linac RF power needs and layout. Surface electric and magnetic fields, power extraction method, HOM damping, ON/OFF capability and fabrication technology were all evaluated to provide a reliable design.

  17. Structure of a tropical island forest area directly affected by the hydroelectric power station of Pilar, Guaraciaba County, Minas Gerais; Estrutura de uma floresta estacional semidecidual insular em area diretamente afetada pela Usina Hidreletrica de Pilar, Guaraciaba, Zona da Mata de Minas Gerais

    Energy Technology Data Exchange (ETDEWEB)

    Meira-Neto, Joao Augusto Alves; Silva, Alexandre Francisco da [Vicosa Univ., MG (Brazil). Dept. de Biologia Vegetal; Souza, Agostinho Lopes de [Vicosa Univ., MG (Brazil). Dept. de Engenharia Florestal; Paula, Alessandro de [Vicosa Univ., MG (Brazil). Curso de Pos-Graduacao em Botanica

    1998-12-31

    Electrical energy consumption in Brazil is increasing and new hydroelectric power stations are required. This work was carried out at a semi deciduous tropical island forest in Guaraciaba, MG to look for composition peculiarities and to provide a structural model which could be applied to reduce environmental damages caused by Pilar HPS. The point-centered quarter method was applied totalizing 50 sample units. Fifty five species were sampled and a Shannon diversity index (H) of 3.429 nats/individual found. The most important species were longiracemosus, Tapirira guianensis, Pera glabrata, Copaifera langsdorffii, Callophyllum brasiliensis and Guapira opposita. The Guaraciaba island forest presented the peculiarity of Podocarpus sellowii occurrence sellowii occurrence, a rare gymnosperm species that does not occur at nearby forests. The Guaraciaba island forest is probably representative of an original alluvial forest at Piranga valley. (author) 14 refs., 1 fig., 1 tab.

  18. Determination of angle of inclination for optimum power production ...

    African Journals Online (AJOL)

    Considering the Daily Average Power Output, Tilt angle of 150 recorded Optimum Daily Average Power output of 16.83 Watts throughout the period of measurement. This suggests that tilt angle of 150 is considered as suitable angle for Solar panel installation for optimum daily power production in this geographical location.

  19. Production planning in a Virtual Power Plant

    NARCIS (Netherlands)

    Bosman, M.G.C.; Bakker, Vincent; Molderink, Albert; Hurink, Johann L.; Smit, Gerardus Johannes Maria

    2009-01-01

    Distributed electricity generation is increasingly applied in the electricity grid. This generation can be more energy efficient than conventional generation; however, a large scale introduction of distributed generators implies possible instability in the grid. A Virtual Power Plant (VPP) deals

  20. Power production from biomass; Energiegewinnung aus Biomasse

    Energy Technology Data Exchange (ETDEWEB)

    Mayer, W.; Greiff, K. [TU Muenchen, Straubing (Germany). Wissenschaftszentrum Straubing

    2007-07-01

    The ambitious targets of the Federal Republic of Germany in increasing the share of renewable energy in the power generation up to the year 2020 can be achieved by a substantial employment of biomass. Therefore, the slogan is: from farmer to power economist. The food-processing industry regards these tendencies with anxiety. The actual state of the art is described. The authors describe the potentials and chances of energy from biomass.

  1. Legal obstacles and incentives to the development of small scale hydroelectric projects in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small scale hydroelectric energy at the state level are discussed. The discussion is designed to aid the developer in the determination of which permits, licenses, and laws of the state must be secured or complied with for the development of a project. The Federal government also exercises extensive regulatory authority in the area. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Specific sections that follow are: Massachusetts Water Law; Licensing, Permitting, and Review Procedures; Indirect Considerations (by departments); Department of Public Utilities Regulation of Privately Owned Electric Utilities; Massachusetts Municipal Wholesale Electric Company; Miscellaneous Legal Issues Relating to Low-Head Hydroelectric Power; and Financial Considerations.

  2. Adding a small hydroelectric power plant to the irrigation system of the Liddes community. Feasibility study; Installation d'une petite centrale hydraulique sur le reseau d'irrigation de la commune de Liddes. Etude de faisabilite

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    This final report prepared for the Swiss Federal Office of Energy (SFOE) examines the possibility of generating electric power with an irrigation system in the southwestern Swiss Alps. The water of the mountain torrent of Palasuit is collected at an altitude of 1620 m above sea-level in a reservoir. It is then passed through a pipeline to the distribution reservoir at 1450 m above sea-level. Among the various schemes studied, the most promising one comprises a Pelton turbine with 2 injectors that utilises a net height-difference of 162 meters. The resulting flow amounts to 150 l/s producing 197 kW of power. In order to achieve this flow, some sections of the pipeline must be replaced by ducts of a larger diameter. If the community of Liddes would obtain the permission to generate power during the whole year, the production would amount to 574,000 kWh/year and the resulting cost 0.090 CHF/kWh.

  3. Study of hydrogen production from wind power in Algeria

    Energy Technology Data Exchange (ETDEWEB)

    Aiche-Hamane, Lilia; Belhamel, Maiouf; Benyoucef, Boumedienne; Hamane, Mustapha [Centre for Development of Renewable Energies (CDER), Alger (Algeria)

    2010-07-01

    An overview of the potentiality of hydrogen production from wind power in Algeria has been given in this study. Wind resource assessment has been presented in cartographic form and windy sites have been identified for wind power application. A system constituted by a wind turbine, an electrolyser and a power conditioning device have been proposed for the study of hydrogen production in the southwest region of Algeria. For this purpose, the transient system simulation program (TRNSYS) have been used. The results obtained showed the sensitivity of hydrogen production to the wind resource trend and the importance of optimisation of the electrolyser according to the power produced by the wind turbine. (orig.)

  4. Considering on the use of thermal power plants in Brazil; Discorrendo sobre o uso das termeletricas no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Lima, Maria Thereza da Silva Lopes; Souza, Marina Correa de [Universidade Federal dos Vales do Jequitinhonha e Mucuri (UFVJM), Diamantina, MG (Brazil). Inst. de Ciencia e Tecnologia

    2015-07-01

    Today, the world depends on an abundant amount of energy. Hence, there is a need in creating new ways of obtaining energy to boost industrial production and thereby increase the wealth of a country. Therefore, industrial growth is strongly linked to way to get clean and cheap energy. In Brazil, preferentially uses the energy from the hydroelectric plants, but these may not always generate the energy required to supply all our needs. So, we can not deny that the thermal power plants have a respectable role in power generation, complementing the energy from the hydroelectric when they go through times of low production, as in periods of drought. (author)

  5. Power productivity of the ground surface

    Directory of Open Access Journals (Sweden)

    Gutu A.I.

    2008-12-01

    Full Text Available Here there is presented an attempt to estimate the efficiency degree when working with soil surface through the different methods of valorization incident solar radiation. Such technical methods are being analyzed as (solar collectors, photovoltaic cells, solar thermal power plants, power cultures field (bushes, wheat, sunflower, maize, rape, sorghum as well as microalgae crops. Here is the description of advantages and disadvantages for each group in part out of these three. The technical methods are up to date from the efficiency utilization view-point of industrial area. Microalgae crops are similar to technical methods from this point of view.

  6. Small water courses for electric power generation; Mit wenig Wasser zum Fliessen bringen

    Energy Technology Data Exchange (ETDEWEB)

    Ossberger, K.F.; Wirth, D. [Ossberger Turbinenfabrik GmbH und Co, Weissenburg (Germany)

    1997-12-31

    In principle, no one nowadays doubts the usefulness of small hydroelectric installations. Hydro power is a renewable energy source. Contrary to oil, gas or coal, the energy source is not consumed. Hydroelectric power generation neither gives rise to atmospheric pollution nor does it cause residual products; it is environment-friendly. Moreover, the energy used is a native one. These arguments no doubt advocate the broadest possible use of hydro power, especially also in the form of small hydroelectric installations. (orig.) [Deutsch] Grundsaetzlich gibt es heutzutage keinen Zweifel am Nutzen von Kleinkraftwerken. Die Wasserkraft ist eine regenerierbare Energiequelle. Im Gegensatz etwa zu Oel, Gas oder Kohle wird der Energietraeger Wasser beim Nutzungsvorgang nicht aufgebraucht. Die Stromerzeugung aus Wasserkraft belastet die Umwelt weder durch Luftschadstoffe noch Rueckstaende, sie ist umweltfreundlich. Und man nutzt damit einheimische Energie. Gewichtige Argumente zweifellos, die fuer eine moeglichst weitgehende Wasserkraftnutzung, gerade auch in Kleinkraftwerken, sprechen. (orig.)

  7. Illuminating the Hazards of Powerful Laser Products

    Science.gov (United States)

    ... Radiation-Emitting Products Tobacco Products Vaccines, Blood & Biologics Articulos en Espanol Alimentos y Bebidas Cosméticos Dispositivos Médicos Dispositivos que Emiten Radiación Fraude en la Salud Medicamentos Nutrición Productos Veterinarios Productos de Tabaco Salud ...

  8. Profitability of Qualified-Labour-Power Production

    Science.gov (United States)

    Baldino, Roberto Ribeiro; Cabral, Tânia Cristina Baptista

    2015-01-01

    In Baldino and Cabral (2013) we introduced the concept of qualified labour-power as the commodity produced by the school system. In the present article we outline a quantitative model to evaluate the profit rate of educational programmes. We compare a medical school programme with a teacher education programme at a public university in Brazil,…

  9. Wildlife Impact Assessment and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Phase 1, Volume Two (B), Clark Fork River Projects, Cabinet Gorge and Noxon Rapids Dams, Operator, Washington Water Power Company.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1984-06-01

    This report documents best available information concerning the wildlife species impacted and the degree of the impact. A target species list was developed to focus the impact assessment and to direct mitigation efforts. Many non-target species also incurred impacts but are not discussed in this report. All wildlife habitats inundated by the two reservoirs are represented by the target species. It was assumed the numerous non-target species also affected will be benefited by the mitigation measures adopted for the target species. Impacts addressed are limited to those directly attributable to the loss of habitat and displacement of wildlife populations due to the construction and operation of the two hydroelectric projects. Secondary impacts, such as the relocation of railroads and highways, and the increase of the human population, were not considered. In some cases, both positive and negative impacts were assessed; and the overall net effect was reported. The loss/gain estimates reported represent impacts considered to have occurred during one point in time except where otherwise noted. When possible, quantitative estimates were developed based on historical information from the area or on data from similar areas. Qualitative loss estimates of low, moderate, or high with supporting rationale were assessed for each species or species group.

  10. Eco-design and human-powered products

    Energy Technology Data Exchange (ETDEWEB)

    Kazazian, T. [O2 (France); Jansen, A. [PES Research Group, Delft Univ. of Technology (Netherlands)

    2004-07-01

    This paper presents the relation between eco-design and human-powered products. The results of a number of design projects in the field of eco-design are presented; they focus on the use of human power as a renewable energy source for consumer products. Human-powered energy systems are powered by muscular work from the human body. Opportunities for human-powered energy systems are reduction of life cycle costs and energy self-sufficiency. Challenges can be found in identifying scenarios where the concept of human power is adopted by consumers. Eco-design proves helpful in providing a platform for radical innovations driving the introduction of human-powered technology. (orig.)

  11. Modelling CO2emissions from water surface of a boreal hydroelectric reservoir.

    Science.gov (United States)

    Wang, Weifeng; Roulet, Nigel T; Kim, Youngil; Strachan, Ian B; Del Giorgio, Paul; Prairie, Yves T; Tremblay, Alain

    2018-01-15

    To quantify CO 2 emissions from water surface of a reservoir that was shaped by flooding the boreal landscape, we developed a daily time-step reservoir biogeochemistry model. We calibrated the model using the measured concentrations of dissolved organic and inorganic carbon (C) in a young boreal hydroelectric reservoir, Eastmain-1 (EM-1), in northern Quebec, Canada. We validated the model against observed CO 2 fluxes from an eddy covariance tower in the middle of EM-1. The model predicted the variability of CO 2 emissions reasonably well compared to the observations (root mean square error: 0.4-1.3gCm -2 day -1 , revised Willmott index: 0.16-0.55). In particular, we demonstrated that the annual reservoir surface effluxes were initially high, steeply declined in the first three years, and then steadily decreased to ~115gCm -2 yr -1 with increasing reservoir age over the estimated "engineering" reservoir lifetime (i.e., 100years). Sensitivity analyses revealed that increasing air temperature stimulated CO 2 emissions by enhancing CO 2 production in the water column and sediment, and extending the duration of open water period over which emissions occur. Increasing the amount of terrestrial organic C flooded can enhance benthic CO 2 fluxes and CO 2 emissions from the reservoir water surface, but the effects were not significant over the simulation period. The model is useful for the understanding of the mechanism of C dynamics in reservoirs and could be used to assist the hydro-power industry and others interested in the role of boreal hydroelectric reservoirs as sources of greenhouse gas emissions. Copyright © 2017 Elsevier B.V. All rights reserved.

  12. Influence of environmental variables on diffusive greenhouse gas fluxes at hydroelectric reservoirs in Brazil

    Directory of Open Access Journals (Sweden)

    JP. Rogério

    Full Text Available For almost two decades, studies have been under way in Brazil, showing how hydroelectric reservoirs produce biogenic gases, mainly methane (CH4 and carbon dioxide (CO2, through the organic decomposition of flooded biomass. This somewhat complex phenomenon is due to a set of variables with differing levels of interdependence that directly or indirectly affect greenhouse gas (GHG emissions. The purpose of this paper is to determine, through a statistical data analysis, the relation between CO2, CH4 diffusive fluxes and environmental variables at the Furnas, Itumbiara and Serra da Mesa hydroelectric reservoirs, located in the Cerrado biome on Brazil's high central plateau. The choice of this region was prompted by its importance in the national context, covering an area of some two million square kilometers, encompassing two major river basins (Paraná and Tocantins-Araguaia, with the largest installed power generation capacity in Brazil, together accounting for around 23% of Brazilian territory. This study shows that CH4 presented a moderate negative correlation between CO2 and depth. Additionally, a moderate positive correlation was noted for pH, water temperature and wind. The CO2 presented a moderate negative correlation for pH, wind speed, water temperature and air temperature. Additionally, a moderate positive correlation was noted for CO2 and water temperature. The complexity of the emission phenomenon is unlikely to occur through a simultaneous understanding of all the factors, due to difficulties in accessing and analyzing all the variables that have real, direct effects on GHG production and emission.

  13. Development of wind power production in arctic climate

    Energy Technology Data Exchange (ETDEWEB)

    Peltola, E.; Kaas, J.; Aarnio, E. [Kemijoki Oy (Finland)

    1998-10-01

    The project Development of wind power production in arctic climate is a direct continuation of Arctic wind energy research project, which started in 1989. The main topics in 1996-97 have been production development and commercialising the blade heating systems, development of operation and maintenance practices of arctic wind power plants, preparations for new wind farms and various network connection and energy system studies. Practical operations have taken place in Pyhaetunturi test power plant and in Paljasselkae and Lammashovi power plants, which are in commercial operation

  14. Safety of power transformers, power supplies, reactors and similar products - Part 1: General requirements and tests

    CERN Document Server

    International Electrotechnical Commission. Geneva

    1998-01-01

    This International Standard deals with safety aspects of power transformers, power supplies, reactors and similar products such as electrical, thermal and mechanical safety. This standard covers the following types of dry-type transformers, power supplies, including switch mode power supplies, and reactors, the windings of which may be encapsulated or non-encapsulated. It has the status of a group safety publication in accordance with IEC Guide 104.

  15. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  16. External Costs Related to Power Production Technologies

    DEFF Research Database (Denmark)

    Ibsen, Liselotte Schleisner; Nielsen, Per Sieverts

    1997-01-01

    of the Danish part of the project is to implement the framework for externality evaluation, for three different power plants located in Denmark. The paper will focus on the assessment of the impacts of the whole fuel cycles for wind, natural gas and biogas. Priority areas for environmental impact assessment...... are identified, based on results of earlier studies and some identified of specific relevance for Denmark. Importance is attached to the quantification of impacts for each of the three fuel cycles and to monetisation of the externalities....

  17. A model optimization for pre-dispatch among the hydroelectric generator unities; Um modelo de otimizacao para pre-despacho entre as unidades geradoras de hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Colnago, Glauber R.; Correia, Paulo B. [Universidade Estadual de Campinas (UNICAMP), Campinas, SP (Brazil). Faculdade de Engenharia Mecanica]. E-mails: grcolnago@fem.unicamp.br; pcorreia@fem.unicamp.br

    2006-07-01

    This work proposes a mixed integer nonlinear programming model to pre-dispatch of a hydroelectric power plant. In the model we want to minimize the losses in the electricity generation with conditions of electricity demand, operational prohibited zones and units' efficiency data. The Xingo Hydroelectric Power Plant was utilized in the mode tests. The solver used was Lingo 8.0. (author)

  18. Graphic proposal for multi thematic maps: the case of geoenvironmental diagnostic map of the Igarapava hydroelectric power plant; Proposta grafica para mapas politematicos: o caso do mapa diagnostico geoambiental da U.H.E. de Igarapava

    Energy Technology Data Exchange (ETDEWEB)

    Carmo, Valeria Amorim do [Minas Gerais Univ., Belo Horizonte, MG (Brazil). Inst. de Geociencias. Dept. de Geografia

    1995-12-31

    This article aims at developing a graphic proposal for multithematic diagnostic map. The research`s objective is the analysis of the legends of the maps entitled Mapa Diagnostico Geoambiental da Usina Hidreletrica de Igarapava (Geoenvironmental Diagnostic map of the Igarapava Hydroelectric Plant). The analysis emphases on identifying and solving problems resulting in non-respect of the graphic transcription laws which prejudice the map`s clarity. Upon analyzing both versions of the maps, it appeared that these problems were basically resulting from bad legibility and visualization and the inadequate use of retina`s variables in the translation of graphic density and both retinian and angular separation. Graphic density was reduced and retinian separation was improved through leading a better contrast between elements of cartographic base and the Geoenvironment Synthesis Map. The angular separation was increased by using simplified forms to better visualization of the spatial structure of the information. That aspect was laos improved by creating a series of small maps to accompany the legend. Point and line elements were represented on the same map so to not prejudice hierarchical relationship between elements. All these modifications were done without affecting information extraction of the various levels of the Geoenvironmental Synthesis (BASE MAP, VEGETATION and LAND USE, HUMAN ASPECTS, CULTURAL ASPECTS AND ENVIRONMENTAL DYNAMIC). The visualization of the document as a whole was greatly improved with respect to the original proposed format. This research is but one of the various steps to the preparation of an environmental map that aims at giving clear visibility to the thousands of words of an environmental study report. (author) 4 refs., 8 figs.

  19. Power Ultrasound to Process Dairy Products

    Science.gov (United States)

    Bermúdez-Aguirre, Daniela; Barbosa-Cánovas, Gustavo V.

    Conventional methods of pasteurizing milk involve the use of heat regardless of treatment (batch, high temperature short time - HTST or ultra high temperature - UHT sterilization), and the quality of the milk is affected because of the use of high temperatures. Consequences of thermal treatment are a decrease in nutritional properties through the destruction of vitamins or denaturation of proteins, and sometimes the flavor of milk is undesirably changed. These changes are produced at the same time that the goal of the pasteurization process is achieved, which is to have a microbiological safe product, free of pathogenic bacteria, and to reduce the load of deteriorative microorganisms and enzymes, resulting in a product with a longer storage life.

  20. Power Curve Measurements, quantify the production increase

    DEFF Research Database (Denmark)

    Gómez Arranz, Paula; Vesth, Allan

    The purpose of this report is to quantify the production increase on a given turbine with respect to another given turbine. The used methodology is the “side by side” comparison method, provided by the client. This method involves the use of two neighboring turbines and it is based on the assumpt...... on the assumption that the wind field in front of the tested turbines is statistically the same (i.e. has in average the same mean wind speed conditions in front of both turbines). The method is only used for the evaluation of a relative change in the AEP, not the AEP itself.......The purpose of this report is to quantify the production increase on a given turbine with respect to another given turbine. The used methodology is the “side by side” comparison method, provided by the client. This method involves the use of two neighboring turbines and it is based...

  1. Modeling of the power cable production line

    Energy Technology Data Exchange (ETDEWEB)

    Kosar, Vanja; Gomzi, Zoran [Faculty of Chemical Engineering and Technology, Department of Reaction Engineering and Catalysis, University of Zagreb, Savska c. 16, HR-10000 Zagreb (Croatia)

    2007-06-15

    During the manufacturing of a power cable insulated with the cross-linkable polyethylene, the hot polymer is applied to the conductor by extrusion, below temperatures of the rapid cross-linking. The coated cable passes into a high-pressure tube (filled with nitrogen under the pressure of 10 bar) in order to heat up the insulation to temperatures at which the cross-linking agent is highly active. This is the continuous vulcanization (CV) tube. Changes of process variables associated with the CV tube can cause changes in the physical properties, the aging characteristics, and especially the heat resistance of the cable insulation. Performance of insulating compounds in this area of the cross-linking process can determine maximum output rates of a power cable manufacturing facility. The mathematical model describes cross-linking process in the vulcanization tube, which is in fact a tubular reactor. In the vulcanization tube heat is transferred by convection, conduction and radiation. Also, the reaction heat is liberated by the chemical reaction and the heat balance describes all four impacts. Formal part of the mathematical model is a material balance that describes the reactions kinetics. Heat and mole balance are connected with reaction rate and mathematically present a system of partial differential equations which will be numerically solved for chosen boundary conditions, both for the reaction part and for the cooling part of a process. On the basis of the real process parameters and the presented mathematical model simulation of the process was conducted. From the presented simulation the optimal process parameters such as process temperatures, cable linear velocity (u) and cable cooling properties of CV line are predicted and evaluated. (author)

  2. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  3. Torrefaction of biomass for power production

    DEFF Research Database (Denmark)

    Saleh, Suriyati Binti

    the influence of reactor mass loading, gas flow and grinding ball size and material. The particle size reduction capability of the torrefaction process has been evaluated by using the relative change in d50 of the product size distribution, and this method was compared with the Hardgrove Grindability Index (HGI...... to predict the torrefaction characteristic of different biomass types are desired. In this study, the influence of biomass chemical properties (carbohydrate composition and alkali content) on the torrefaction behavior with respect to mass loss and grindability is investigated. Six raw biomass samples (Danish...

  4. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  5. Social power, product conspicuousness, and the demand for luxury brand counterfeit products.

    Science.gov (United States)

    Bian, Xuemei; Haque, Sadia; Smith, Andrew

    2015-03-01

    The aim of this article is twofold: (1) to achieve a better understanding of the psychological determinants of the demand for luxury brand counterfeit products (LBCP) through exploring the effects of social power; (2) to extend power literature by identifying boundary conditions of the relationship between social power and compensatory consumption identified by Rucker and Galinsky (2008, J. Consum. Res., 35, 257-267) and Rucker and Galinsky (2009, J. Exp. Soc. Psychol., 45, 549-555). Findings from three experiments demonstrate that social power holds key insights into understanding consumers' purchase propensity for LBCP; product conspicuousness moderates the effects of social power on purchase propensity for status products; these moderation effects are only observed when the status products are LBCP but not genuine products. This article, therefore, contributes to the literature regarding the demand for counterfeits as well as the social power and compensatory consumption literature. © 2014 The British Psychological Society.

  6. Electric power supply in an offshore oil production platform | Ibe ...

    African Journals Online (AJOL)

    A study of the provision of electric power using associated natural gas as primary source of energy, in an offshore oil production platform has been carried out. Some of the problems to be contended with include: the effects of impurities contained in the fuel gas supply;variations in the production process characteristics; ...

  7. Selling green power in California: Product, industry, and market trends

    Energy Technology Data Exchange (ETDEWEB)

    Wiser, R.H.; Pickle, S.J.

    1998-05-01

    As one of the first US stages to open its doors to retail electric competition, California offers an important opportunity to assess the effectiveness of green power marketing as a mechanism for supporting renewable energy. This report is an interim assessment of key green power product, industry, and market trends in California. The report identifies and analyzes: the potential size of the green power market in California; the companies participating in the green power market; the green power products being offered and their prices; the impact of the green market on renewable generators and the environment; and the influence of several public policies and non-governmental programs on the market for green power. Data used in this paper have been collected, in large part, from surveys and interviews with green power marketers that took place between December 1997 and April 1998. There remain legitimate concerns over the viability of green power marketing to support significant quantities of renewable energy and provide large environmental gains, and it is far too early to assess the overall strength of customer demand for renewable energy. A critical finding of this report is that, because of the high cost of acquiring and servicing residential customers and the low utility default service price, green power marketing affords new energy service providers one of the only viable entrees to California`s residential marketplace.

  8. Greenhouse gas emissions from Brazil’s Amazonian hydroelectric dams

    Science.gov (United States)

    Fearnside, Philip M.

    2016-01-01

    Tropical dams are often falsely portrayed as ‘clean’ emissions-free energy sources. The letter by de Faria et al (2015 Environ. Res. Lett. 10 124019) adds to evidence questioning this myth. Calculations are made for 18 dams that are planned or under construction in Brazilian Amazonia and show that emissions from storage hydroelectric dams would exceed those from electricity generation based on fossil fuels. Fossil fuels need not be the alternative, because Brazil has vast potential for wind and solar power as well as opportunities for energy conservation. Because dam-building is rapidly shifting to humid tropical areas, where emissions are higher than in other climatic zones, the impact of these emissions needs to be given proper weight in energy-policy decisions.

  9. Reference costs of the electric power production; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    This study periodically realized by the DGEMP aims to compare the competitiveness of the different channels of electric power production, for different utilization conditions. The first part ''reference costs of the 2003 electric power production'' examines the prices of the electric power produced by different channels in particular in the framework of the industrial implementing in 2015. The nuclear and thermal power plants are concerned. The second part is devoted to the decentralized production channels (wind energy, photovoltaic, cogeneration heat-electricity) is under construction and will be presented next year. (A.L.B.)

  10. A study of the optimum draft of multiple resonance power buoys for maximizing electric power production

    Directory of Open Access Journals (Sweden)

    Hyuck-Min Kweon

    2014-12-01

    Full Text Available To maximize electric power production using wave energy extractions from resonance power buoys, the maximum motion displacement spectra of the buoys can primarily be obtained under a given wave condition. In this study, wave spectra observed in shoaling water were formulated. Target resonance frequencies were established from the arithmetic means of modal frequency bands and the peak frequencies. The motion characteristics of the circular cylindrical power buoys with corresponding drafts were then calculated using numerical models without considering PTO damping force. Results showed that the heave motions of the power buoys in shoaling waters with insufficient drafts produced greater amplification effects than those in deep seas with sufficient drafts.

  11. Power Production and Economical Feasibility of Tideng Tidal Stream Power Converter

    DEFF Research Database (Denmark)

    Parmeggiani, Stefano; Frigaard, Peter; Kofoed, Jens Peter

    This report is a product of the contract between Aalborg University and TIDENG (by Bent Hilleke) on the evaluation and development of the TIDENG Tidal Energy Conversion System (TECS). The work has focused on the evaluation of the yearly power production of the device and its economical feasibility...

  12. Emotional Labour and Governmentality: Productive Power in Childcare

    DEFF Research Database (Denmark)

    Monrad, Merete

    2017-01-01

    This article examines the interplay between governance and cost-containment efforts in the public sector and the emotional labour and well-being of childcare workers. Care work researchers have highlighted the complexities of power in emotional labour, such as the fact that emotional labour may...... simultaneously benefit the individual worker and reproduce inequalities that may be detrimental to workers’ well-being. The goal of this article is to develop our theoretical understanding of power in emotional labour and show how power is related to emotional labour not only constrainedly in terms of lack...... of control, status and resources but also productively in terms of the subjectivities enabled by organisations. The article draws upon the works of Foucault and Rose, particularly the concepts of productive power and governmentality and suggests that emotional labour may be conceptualised as a technology...

  13. Personalisation of power, neoliberalism and the production of corruption

    OpenAIRE

    Ahmad Khair, Amal Hayati; Haniffa, Roszaini; Hudaib, Mohammad; Abd. Karim, Mohamad Nazri

    2015-01-01

    This paper utilises a political lens in considering the cause for the production of corruption and the role of political leadership. Specifically, the notion of personalisation of power as advocated by Slater (2003) is adopted to portray how the adoption of neoliberalism ideology by an aspiring autocratic leader results in the weakening of the infrastructural power through three strategies: packing, rigging and circumventing. We use Perwaja Steel as a case study to demonstrate the modus opera...

  14. Wind power. Production in 2012; Vindkraft. Produksjon i 2012

    Energy Technology Data Exchange (ETDEWEB)

    Weir, David Edward; Nybakke, Karen

    2013-02-01

    In 2012 it was installed more wind power in Norway than in any year before. There was also production record with a total power generation from wind energy at ca. 1.57 TWh, equivalent to 1.1% of Norway's electricity production. 2012 was a relatively good 'wind year', with a production index of 107% for Norwegian wind farms as a whole. The length of time for wind was also relatively high compared to previous years with a national average of 2734 full load hours, corresponding to a capacity factor of 31%. Turbine availability also reached a record value of 95.6% in 2012 indicating more efficient operation of wind power plants in Norway.(eb)

  15. Capacity and investments in power production. Studies concerning Germany, the Netherlands and Poland; Kapasitet og investeringer i kraftproduksjon. Landstudier for Tyskland, Nederland og Polen

    Energy Technology Data Exchange (ETDEWEB)

    Haugland, Torleif; Magnus, Eivind; Moen, Paal; Bowitz, Einar

    1998-12-01

    This report describes the production capacity for electricity in Germany, the Netherlands and Poland and presents plans existing in these countries for investments in new capacity and scrapping of existing capacity. Using economic theory it discusses some issues that influence investments in a liberalized market. It is part of a project undertaken to quantify the value of power in the Norwegian hydroelectric power system. The observations and conclusions will form an important empirical foundation for the analysis of the adaptation and stability properties of the Nordic power market as one approaches full capacity with respect to power at peak load. The report will be followed up by an analysis of the developments of investments, market balance and prices up to 2015 in the three countries. These countries have considerable surplus capacities, but for reasons that vary from country to country. The composition of the surplus capacities also vary considerably from one country to the other, which is important for the impact that the capacity and market balance in these countries might have on the Nordic power market in the future. 16 refs., 23 figs., 17 tabs.

  16. Hydroelectricity and ecological considerations. Falsification of the environmental reality by the opponents of hydropower

    Directory of Open Access Journals (Sweden)

    Andrzej Giziński

    2013-09-01

    Full Text Available Opponents of hydroelectricity claim falsely that hydrotechnical development of the Lower Vistula River constitutes implementation of Edward Gierek’s concept of bringing only environmental damage1. Statements on the negative environmental impact of constructing small hydroelectric power stations (SHPS are equally groundless. Permanent protests against the construction of dams and river damming, regardless of the motivations and will of protesters, increase energy dependence on Russia, and preserves the poor, post-Bierut hydrological situation2. The main fallacy made by hydropower opponents is the alternative treatment of power and environmental purposes. Environmental errors consist in continuous omission of even the most obvious positive ecological effects of constructing river dams and – what is especially reprehensible – inventing non-existent threats, e.g. lethal concentration of toxic heavy metals in deposits of the Włocławek Reservoir or the detrimental impact of warming up water in stage of falls on the fish population below the dam.

  17. Comparative study of the impacts of hydroelectric power plants with impacts avoided by a Virtual Plants Equivalents (VPEs) through of energy efficiency actions; Estudo comparativo dos impactos das usinas hidreletricas com os impactos evitados por uma usina virtual equivalente atraves das acoes de eficiencia energetica

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Roberto Perillo Barbosa da; Barros, Regiane Silva de [Universidade Estadual de Campinas (FEM/UNICAMP), SP (Brazil). Fac. de Engenharia Mecanica], emails: rpbsilva@fem.unicamp.br, rsbarros@fem.unicamp.br Rossi, Luiz Antonio [Universidade Estadual de Campinas (FEAGRI/UNICAMP), SP (Brazil). Fac. Engenharia Agricola], email: rossi@feagri.unicamp.br

    2010-07-01

    This article presents a comparative study of the impacts caused by Hydroelectric Power Plants (HPPs) in relation to the impacts avoided through actions that promotes energy efficiency called Virtual Plants Equivalents (VPEs). To do so, it was considering the recent results presented by the National Program for Electric Energy Conservation (PROCEL) to the year 2008, which shows that the program actions' in this period resulted in a Virtual Plant Equivalent of 1049 MW. It was performed a survey of the values of wetland and families displaced by the construction of hydropower plants and, later, it was compared these data with the values found in the literature and, finally, it was established that the actions of energy efficiency are important instruments to avoid (or at least postpone) the social and environmental impacts directly and indirectly that affects the whole society. Thus, it is suggested that there is a stimulus in relation to energy efficiency actions, what is observed nowadays in Brazil is that these actions are negligible before the potential that exists at industrial, commercial and residential sectors. (author)

  18. The scenario of power generation in Brazil; O cenario da geracao de energia no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Dupim, Ivaldete da Silva [Universidade Federal do ABC, Santo Andre, SP (Brazil); Abreu Junior, Otavio Castor de; Moreira, Joao Manoel Losada; Carajilescov, Pedro; Leite, Patricia Teixeira; Cicogna, Marcelo A.

    2008-07-01

    The values concerning to the production of national power today, the evolution of composition and the installed capacity of electric matrix between the years 1980-2005, the outlook for demand and supply of energy according to the 'Plano Decenal de Energia' (2006-2015) were used as information basis for this study and analysis of some peculiar characteristics of the management of the energy sector in Brazil. The main objective was to highlight the importance of hydroelectric generation in Brazil. Finally we tried to make the comparison of the costs of hydroelectric generation in relation to other alternative sources available in the country.

  19. Force production during pereiopod power strokes in Calanus finmarchicus

    Science.gov (United States)

    Lenz, P. H.; Hower, A. E.; Hartline, D. K.

    2004-08-01

    Copepods achieve the dramatic speeds of 300-1000 body lengths/s during escape reactions. We investigated the details of this behavior in Calanus finmarchicus. Pereiopod movements during the power strokes were monitored in tethered individuals using high-speed video, while simultaneously measuring force production. At 8-10 °C, the power strokes for each pair of pereiopods registered as separate peaks in the force record, with the largest force being produced by the fourth and third pairs. Peak forces of 500-600 μN were attained within 3.5 ms of initiation of the power stroke sequence. During the power strokes, the pereiopods maximized their surface area by splaying distal segments and setae. During the return stroke, the pereiopods and the setae collapsed, minimizing surface area and thus generating only a weak reverse force. During power stroke sequences in free swimming C. finmarchicus, multiple peaks in acceleration (200 m s -2) corresponded to the power strokes of different pereiopod pairs. During the escape, C. finmarchicus produced maximum swimming speeds of 800 mm s -1 and an estimated muscle-mass specific power output of 300 W kg -1. Comparisons to other organisms indicate that this behavioral performance is particularly powerful and fast. How the copepods achieve this performance remains to be determined.

  20. Testing for Monopoly Power when Products are Differentiated in Quality

    NARCIS (Netherlands)

    Verboven, F.L.

    1995-01-01

    This paper proposes a reduced form approach toempirically identify the presence of monopoly power in oligopolies characterized by vertical product di erentia-tion. In a fairly general model I derive the reduced form pricing equation under the hypothesis that rms collude by maximizing their joint pro

  1. Possibilities of production of nanopowders with high power ELV ...

    Indian Academy of Sciences (India)

    Home; Journals; Bulletin of Materials Science; Volume 34; Issue 4. Possibilities of production of nanopowders with high power ELV electron accelerator. Vladimir Ivanovich Lysenko Sergey Bardakhanov Alexey Korchagin Nikolay Kuksanov Alexander Lavrukhin Rustam Salimov Sergey Fadeev Vladislav Cherepkov Mikhail ...

  2. Estimates of individual muscle power production in normal adult walking.

    Science.gov (United States)

    Bogey, Ross A; Barnes, Lee A

    2017-09-11

    The purpose of this study was to determine the contribution of individual hip muscles to the net hip power in normal adult self-selected speed walking. A further goal was to examine each muscle's role in propulsion or support of the body during that task. An EMG-to-force processing (EFP) model was developed which scaled muscle-tendon unit (MTU) force output to gait EMG. Active muscle power was defined as the product of MTU forces (derived from EFP) and that muscle's contraction velocity. Passive hip power was estimated from passive moments associates with hip position (angle of flexion (extension)) and the hip's angular velocity. Net hip EFP power was determined by summing individual active hip muscle power plus the net passive hip power at each percent gait cycle interval. Net hip power was also calculated for these study participants via inverse dynamics (kinetics plus kinematics, KIN). The inverse dynamics technique - well accepted in the biomechanics literature - was used as a "gold standard" for validation of this EFP model. Closeness of fit of the power curves of the two methods was used to validate the model. The correlation between the EFP and KIN methods was sufficiently close, suggesting validation of the model's ability to provide reasonable estimates of power produced by individual hip muscles. Key findings were that (1) most muscles undergo a stretch-shorten cycle of muscle contraction, (2) greatest power was produced by the hip abductors, and (3) the hip adductors contribute to either hip adduction or hip extension (but not both). The EMG-to-force processing approach provides reasonable estimates of individual hip muscle forces in self-selected speed walking in neurologically-intact adults.

  3. Life Cycle Assessment of Coal-fired Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Spath, P. L.; Mann, M. K.; Kerr, D. R.

    1999-09-01

    Coal has the largest share of utility power generation in the US, accounting for approximately 56% of all utility-produced electricity (US DOE, 1998). Therefore, understanding the environmental implications of producing electricity from coal is an important component of any plan to reduce total emissions and resource consumption. A life cycle assessment (LCA) on the production of electricity from coal was performed in order to examine the environmental aspects of current and future pulverized coal boiler systems. Three systems were examined: (1) a plant that represents the average emissions and efficiency of currently operating coal-fired power plants in the US (this tells us about the status quo), (2) a new coal-fired power plant that meets the New Source Performance Standards (NSPS), and (3) a highly advanced coal-fired power plant utilizing a low emission boiler system (LEBS).

  4. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  5. The power of design product innovation in sustainable energy technologies

    CERN Document Server

    Reinders, Angele H; Brezet, Han

    2012-01-01

    The Power of Design offers an introduction and a practical guide to product innovation, integrating the key topics that are necessary for the design of sustainable and energy-efficient products using sustainable energy technologies. Product innovation in sustainable energy technologies is an interdisciplinary field. In response to its growing importance and the need for an integrated view on the development of solutions, this text addresses the functional principles of various energy technologies next to the latest design processes and innovation methods. From the perspec

  6. Converting Maturing Nuclear Sites to Integrated Power Production Islands

    Directory of Open Access Journals (Sweden)

    Charles W. Solbrig

    2011-01-01

    plutonium. A nuclear island, an evolution of the integral fast reactor, utilizes all the Transuranics (Pu plus minor actinides produced in power production, and it eliminates all spent fuel shipments to and from the site. This latter attribute requires that fuel reprocessing occur on each site and that fast reactors be built on-site to utilize the TRU. All commercial spent fuel shipments could be eliminated by converting all LWR nuclear power sites to nuclear islands. Existing LWR sites have the added advantage of already possessing a license to produce nuclear power. Each could contribute to an increase in the nuclear power production by adding one or more fast reactors. Both the TRU and the depleted uranium obtained in reprocessing would be used on-site for fast fuel manufacture. Only fission products would be shipped to a repository for storage. The nuclear island concept could be used to alleviate the strain of LWR plant sites currently approaching or exceeding their spent fuel pool storage capacity. Fast reactor breeding ratio could be designed to convert existing sites to all fast reactors, or keep the majority thermal.

  7. Analysis of the Brazilian national regulatory overview aiming the insertion of mini and micro hydroelectric power plants in the energy market; Analise do panorama regulatorio nacional visando a insercao das mini e microcentrais hidreletricas no mercado de energia

    Energy Technology Data Exchange (ETDEWEB)

    Ferrari, Jason Tibirica

    2006-07-01

    The significant expansion of Small Hydro Power plant - SHPs, in the past seven years, can be largely credited, to the incentives regulated by ANEEL, with the intention of stimulating the construction of those enterprises. Among other incentives, they deserve prominence: the authorization no payment for exploration of the hydraulic potential; the relative discharge of financial compensation for the use of hydraulic resources; and the discounts, foreseen in law, for power grid use. In the period of 1998 to October of 2004, ANEEL authorized the construction of 308 SHPs, throughout Brazil, and it allowed the refurbishment of further 46 plants. Besides, it registered 192 hydropower plants , with smaller potency or same to 1 MW, denominated MHP - Mini and Micro Hydropower Plants. Part of this universe of 500 small or miniplants, 43 are located in Sao Paulo state and the great majority in Minas Gerais. In seven years of existence ANEEL granted, 4.576 MW of SHPs and MHP. Those enterprises will contribute to the expansion of the offer of energy, with economy of the use of transmission lines, once the power plant is located, in general, close of the consumer market. The small hydropower plants and mini hydropower plants exemplify a interesting and creative alternative to assist the energy infrastructure development, respecting the other pillars, relative to the environment and the sustainable development. On this context is possible to highlight the value of renewable and less pollutant sources of energy, as well as the prevention of the negative environmental impacts. These types of projects are the ones that come close to perfection, even if considered the available technological resources of the time they were built. Moreover, it can serve as paradigm for the contemporary engineers. All those that, in fact were wrapped up in the recovery or refurbishment of those preciousness, unanimously pay tribute to the SHPs. (author)

  8. Observability of wind power; Observabilite de la production eolienne

    Energy Technology Data Exchange (ETDEWEB)

    Gonot, J.P. [Reseau de Transport d' Electricite, Dir. du Projet IPES, 92 - La Defense (France); Fraisse, J.L. [Electricite Reseau Distribution France (ERDF), Service Raccordement, 92 - Paris la defense (France)

    2009-10-15

    The total installed capacity of wind power grows from a few hundred MW at the beginning of 2005 to 3400 MW at the end of 2008. With such a trend, a total capacity of 7000 MW could be reached by 2010. The natural variability of wind power and the difficulty of its predictability require a change in the traditional way of managing supply/demand balance, day-ahead margins and the control of electrical flows. As a consequence, RTE operators should be informed quickly and reliably of the real time output power of wind farms and of its evolvement some hours or days ahead to ensure the reliability of the French electrical power system. French specificities are that wind farms are largely spread over the territory, that 95 % of wind farms have an output power below 10 MW and that they are connected to the distribution network. In this context, new tools were necessary to acquire as soon as possible data concerning wind power. In two years long, RTE set up an observatory of wind production 'IPES system' enable to get an access to the technical characteristics of the whole wind farms, to observe in real time 75 % of the wind generation and to implement a forecast model related to wind generation. (authors)

  9. The integration of the periodic production in the liberalized electric power markets: from the technic expenditures to the economic taxes imposed by the operating rules of the markets; L'integration de la production intermittente dans les marches electriques liberalises: des surcouts techniques aux penalites economiques imposees par les regles de fonctionnement des marches

    Energy Technology Data Exchange (ETDEWEB)

    Menanteau, Ph.; Finon, D.; Lamy, M.L

    2003-03-01

    In the framework of the climatic change and the energy supply safety, the european directive aims to promote the renewable energy production in Europe. Some of the renewable energy sources, as the wind power or the micro-hydroelectric power, are naturally periodic. Their introduction in the electric networks will create problems because of this periodic nature, problems which are new for the electric network producers and managers. These problems generate technical expenditures, which may be compensate by the economic penalties of the electric power market operating. In this context the document details the expenditures associated to the periodicity, the economic penalties by an analysis of the british market and analyses the possibilities to limit these economic penalties in order to reduce the conflicts between the electric market liberalization and the promotion of the renewable energies development. (A.L.B.)

  10. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  11. Vermont Marble Company, Proctor, Vermont: Otter Creek hydroelectric feasibility report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-01

    Vermont Marble Company (VMCO) owns and operates four hydroelectric projects in a 50-mile reach of Otter Creek in west central Vermont. This study concerns three of the installations - Center Rutland, Beldens, and Huntington Falls. The fourth site is known as Proctor and will be studied separately. All four plants operate as run-of-river stations, and the limited reservoir storage capacity places severe limitations on any other type of operation. The plants are presently operating at much lower outputs than can be obtained, because they do not use the available discharge and head. The results show that, under the assumptions made in this study, Beldens and Huntington Falls can be economically improved. The rehabilitation of the Center Rutland plant did not look economically attractive. However, the improvement of Center Rutland should not be eliminated from further consideration, because it could become economically attractive if the cost of energy starts escalating at a rate of around 10% per year. The study included a brief appraisal of the existing generating facilities and condition of existing concrete structures, a geological reconnaissance of the sites, analysis of the power potential, flood studies, technical and economic investigations and comparative evaluations of the alternatives for developing the streamflow for power generation, selection of the most suitable alternative, financial analysis, preparation of drawings, and preparation of detailed quantity and cost estimates.

  12. Methods and Algorithms for Economic MPC in Power Production Planning

    DEFF Research Database (Denmark)

    Sokoler, Leo Emil

    based on ADMM and Dantzig-Wolfe decomposition are proposed to solve these OCPs. Subproblems that arise in the decomposition algorithms are solved using structure-exploiting algorithms. To reduce computation time of the EMPC algorithms further, warm-start and early-termination strategies are employed...... is operational reserve planning. The operational reserves are activated to balance production and consumption in real-time. An EMPC scheme is presented for activation of operational reserves. Simulations based on a Faroe Islands case study show that signi_cant cost savings can be achieved using this strategy......-variance optimization strategy for EMPC of linear stochastic systems. - Tailored algorithms for solution of the OCPs that arise in EMPC of linear stochastic systems. - Methods for power production planning in small isolated power; the ORPP for unit commitment and economic dispatch, and an EMPC scheme for activation...

  13. Enhanced Passive Cooling for Waterless-Power Production Technologies

    Energy Technology Data Exchange (ETDEWEB)

    Rodriguez, Salvador B. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2016-06-14

    Recent advances in the literature and at SNL indicate the strong potential for passive, specialized surfaces to significantly enhance power production output. Our exploratory computational and experimental research indicates that fractal and swirl surfaces can help enable waterless-power production by increasing the amount of heat transfer and turbulence, when compared with conventional surfaces. Small modular reactors, advanced reactors, and non-nuclear plants (e.g., solar and coal) are ideally suited for sCO2 coolant loops. The sCO2 loop converts the thermal heat into electricity, while the specialized surfaces passively and securely reject the waste process heat in an environmentally benign manner. The resultant, integrated energy systems are highly suitable for small grids, rural areas, and arid regions.

  14. Power plant project success through total productive generation

    Energy Technology Data Exchange (ETDEWEB)

    Kaivola, R.; Tamminen, L.

    1996-11-01

    The Total Productive Generation concept (TPG) defines the lines of action adopted by IVO Generation Services Ltd (IGS) for the operation and maintenance of power plants. The TPG concept is based on procedures tested in practice. The main idea of TPG is continuous development of quality, which is a joint effort of the entire staff. Its objective is to benefit IGS`s own staff and, in particular, the company`s customers. (orig.)

  15. Wind turbine power production and annual energy production depend on atmospheric stability and turbulence

    Directory of Open Access Journals (Sweden)

    C. M. St. Martin

    2016-11-01

    Full Text Available Using detailed upwind and nacelle-based measurements from a General Electric (GE 1.5sle model with a 77 m rotor diameter, we calculate power curves and annual energy production (AEP and explore their sensitivity to different atmospheric parameters to provide guidelines for the use of stability and turbulence filters in segregating power curves. The wind measurements upwind of the turbine include anemometers mounted on a 135 m meteorological tower as well as profiles from a lidar. We calculate power curves for different regimes based on turbulence parameters such as turbulence intensity (TI as well as atmospheric stability parameters such as the bulk Richardson number (RB. We also calculate AEP with and without these atmospheric filters and highlight differences between the results of these calculations. The power curves for different TI regimes reveal that increased TI undermines power production at wind speeds near rated, but TI increases power production at lower wind speeds at this site, the US Department of Energy (DOE National Wind Technology Center (NWTC. Similarly, power curves for different RB regimes reveal that periods of stable conditions produce more power at wind speeds near rated and periods of unstable conditions produce more power at lower wind speeds. AEP results suggest that calculations without filtering for these atmospheric regimes may overestimate the AEP. Because of statistically significant differences between power curves and AEP calculated with these turbulence and stability filters for this turbine at this site, we suggest implementing an additional step in analyzing power performance data to incorporate effects of atmospheric stability and turbulence across the rotor disk.

  16. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    Energy Technology Data Exchange (ETDEWEB)

    Meibom, P. [Risoe National Lab., DTU, System Analysis Dept., Roskilde (Denmark); Weber, C. [Univ. Duisburg-Essen, Chai og Energy Management (Germany); Barth, R.; Brand, H. [Univ. of Stuttgart, Inst. of Energy Economics and the Rational Use of Energy (Germany)

    2007-05-15

    Adding wind power generation in a power system changes the operational patterns of the existing units due to the variability and unpredictability of wind power production. For large amounts of wind power production the expectation is that the operational costs of the other power plants will increase due to more operation time in part-load and more start-ups. The change in operational costs induced by the wind power production can only be calculated by comparing the operational costs in two power system configurations: with wind power production and with alternative production having properties like conventional production, i.e. being predictable and less variable. The choice of the characteristics of the alternative production is not straight forward and will therefore influence the operational costs induced by wind power production. This paper presents a method for calculating the change in operational costs due to wind power production using a stochastic optimization model covering the power systems in Germany and the Nordic countries. Two cases of alternative production are used to calculate the change in operational costs namely perfectly predictable wind power production enabling calculation of the costs connected to unpredictability, and constant wind power production enabling calculation of the operational costs connected to variability of wind power production. A 2010 case with three different wind power production penetration levels is analysed in the paper. (au)

  17. Wholesale water market application for assured energy certificates allocation among hydroelectric power plants; Aplicacao de um mercado atacadista de agua para reparticao dos certificados de energia assegurada entre usinas hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Pinto, Andre Dias

    2007-09-15

    The objective of this dissertation is to revise the methodology used in the calculation of assured energy certificates for hydro plants, in particular the relation among the objectives of reliability and market mechanisms with the certificates. The relationship between the economic signals provided by the market 'spot' of electricity with the certificates will be analyzed. It will be shown that the spot price payment does not provide the correct and necessary incentives for the energy certificates allocation in a cascade with agents belonging the different companies. Upstream reservoirs are not property compensated for the regulation of the energy production of the entire cascade and, as solution, alternative scheme to remunerate the water resources (wholesale water market) will be discussed. The assured energy certificates will be calculated with the proposed methodology and compared with nowadays practiced in the Brazilian system. (author)

  18. Wake Mitigation Strategies for Optimizing Wind Farm Power Production

    Science.gov (United States)

    Dilip, Deepu; Porté-Agel, Fernando

    2016-04-01

    Although wind turbines are designed individually for optimum power production, they are often arranged into groups of closely spaced turbines in a wind farm rather than in isolation. Consequently, most turbines in a wind farm do not operate in unobstructed wind flows, but are affected by the wakes of turbines in front of them. Such wake interference significantly reduces the overall power generation from wind farms and hence, development of effective wake mitigation strategies is critical for improving wind farm efficiency. One approach towards this end is based on the notion that the operation of each turbine in a wind farm at its optimum efficiency might not lead to optimum power generation from the wind farm as a whole. This entails a down regulation of individual turbines from its optimum operating point, which can be achieved through different methods such as pitching the turbine blades, changing the turbine tip speed ratio or yawing of the turbine, to name a few. In this study, large-eddy simulations of a two-turbine arrangement with the second turbine fully in the wake of the first are performed. Different wake mitigation techniques are applied to the upstream turbine, and the effects of these on its wake characteristics are investigated. Results for the combined power from the two turbines for each of these methods are compared to a baseline scenario where no wake mitigation strategies are employed. Analysis of the results shows the potential for improved power production from such wake control methods. It should be noted, however, that the magnitude of the improvement is strongly affected by the level of turbulence in the incoming atmospheric flow.

  19. Problems of hydroelectric development at existing dams: an analysis of institutional, economic, and environmental restraints in Pennsylvania, New Jersey, and Maryland

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, R.J.; Green, L.L.

    1979-04-01

    The methodology that has been developed to analyze the impact of possible government actions on the development of small-scale hydroelectric power in the United States is described. The application of the methodology to a specific region of the United States is also described. Within the Pennsylvania-New Jersey-Maryland (PJM) region, the methodology has been used to evaluate the significance of some of the existing institutional and economic constraints on hydroelectric development at existing dams. The basic process for the analysis and evaluation is estimation of the hydroelectric energy that can be developed for a given price of electricity. Considering the present constraints and a geographical region of interest, one should be able to quantify the potential hydroelectric energy supply versus price. Estimates of how the supply varies with possible changes in governmental policies, regulations, and actions should assist the government in making decisions concerning these governmental functions relative to hydroelectric development. The methodology for estimating the hydroelectric supply at existing dams is included.

  20. Manual for development of small scale hydroelectric projects by public entities

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    This manual is designed to provide guidance to towns, cities, counties and other political subdivisions which are interested in undertaking or participating in small scale hydroelectric (SSH) development within or close to their territorial boundaries. The manual is primarily directed to those political subdivisions which either own or have access to a site, are interested in exploring the prospects for development of the site and do not have longstanding experience in the electric power development. For purposes of this manual a small scale hydroelectric project is a project of 25 to 30 MWs or less and utilizes an existing dam or structure or utilizes the site characteristics of partially breached dams or structures. As the reader will observe from the discussion that follows, several incentives under federal and state law have been implemented which favor small scale hydroelectric development at existing sites. This manual is designed to assist political subdivisions in taking advantage of these incentives and devising strategies for development. The manual will provide information to political subdivisions as to what to expect in the development process and the kinds of informed questions to ask of paid advisers. The manual, however, cannot be and should not be used as a substitute for competent advice and assistance from experienced lawyers, engineers, accountants and financing experts.

  1. Analysis of the Level-Release Polynomial from a Hydroelectric Plant

    Directory of Open Access Journals (Sweden)

    Ieda Hidalgo

    2012-02-01

    Full Text Available The mathematic representation of the tailrace elevation as function of the water release can be modified, for example, by the geomorphologic impact of large floods. The level-release polynomial from a hydroelectric plant is important information to computational models used for optimization and simulation of the power generation systems operation. They depend on data quality to provide reliable results. Therefore, this paper presents a method for adjusting of the tailrace polynomial based on operation data recorded by the plant’s owner or company. The proposed method uses a non-linear regression tool, such as Trendline in Excel. A case study has been applied to the data from a large Brazilian hydroelectric plant whose operation is under the coordination of the Electric System ational Operator. The benefits of the data correction are analyzed using a simulation model for the hydroelectric plants operation. This simulator is used to reproduce the past operation of the plant, first with official data and second with adjusted data. The results show significant improvements in terms of quality of the data, contributing to bring the real and simulated operation closer.

  2. Hydroelectric project impacts on Stikine River ecosystems: An overview

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report provides an overview on the hydroelectric project impacts on Stikine river ecosystems. The objective of this study was to develop a report which would aid...

  3. Renewable power production in a Pan-Caribbean energy grid

    Science.gov (United States)

    Miller, David

    The Small Island Developing States of the Caribbean are victims of geography and geopolitics. Lacking access to large fossil fuel reserves, they are forced to import fuel at prices they have no control over. Renewable energy resources, particularly wind, have the potential to help break the Caribbean dependency on fossil fuels and allow for increased development at the same time. Working from a sustainable development point of view, this project discusses the history of the area, the theoretical background for the idea of large scale renewable power production, the regional initiatives already in place that address both the cost of fossil fuels and the policy hurdles that need to be overcome to assist the region in gaining energy independence. Haiti is highlighted as a special case in the region and the potential use of several renewable resources are discussed, along with a potential business model based on the idea of the Internet. Power storage is covered, specifically the potential of battery operated vehicles to have a positive impact on the Caribbean region and other developing states. The role of government regulation and policy comes into play next, followed by a discussion on the need for developed states to change patterns of behavior in order to achieve sustainability. Finally, nuclear power and liquefied natural gas are reviewed and rejected as power options for the region.

  4. An Integrated Risk Approach for Assessing the Use of Ensemble Streamflow Forecasts in Hydroelectric Reservoir Operations

    Science.gov (United States)

    Lowry, T. S.; Wigmosta, M.; Barco, J.; Voisin, N.; Bier, A.; Coleman, A.; Skaggs, R.

    2012-12-01

    This paper presents an integrated risk approach using ensemble streamflow forecasts for optimizing hydro-electric power generation. Uncertainty in the streamflow forecasts are translated into integrated risk by calculating the deviation of an optimized release schedule that simultaneously maximizes power generation and environmental performance from release schedules that maximize the two objectives individually. The deviations from each target are multiplied by the probability of occurrence and then summed across all probabilities to get the integrated risk. The integrated risk is used to determine which operational scheme exposes the operator to the least amount of risk or conversely, what are the consequences of basing future operations on a particular prediction. Decisions can be made with regards to the tradeoff between power generation, environmental performance, and exposure to risk. The Hydropower Seasonal Concurrent Optimization for Power and Environment (HydroSCOPE) model developed at Sandia National Laboratories (SNL) is used to model the flow, temperature, and power generation and is coupled with the DAKOTA (Design Analysis Kit for Optimization and Terascale Applications) optimization package to identify the maximum potential power generation, the maximum environmental performance, and the optimal operational scheme that maximizes both for each instance of the ensemble forecasts. The ensemble forecasts were developed in a collaborative effort between the Pacific Northwest National Laboratory (PNNL) and the University of Washington to develop an Enhanced Hydrologic Forecasting System (EHFS) that incorporates advanced ensemble forecasting approaches and algorithms, spatiotemporal datasets, and automated data acquisition and processing. Both the HydroSCOPE model and the EHFS forecast tool are being developed as part of a larger, multi-laboratory water-use optimization project funded through the US Department of Energy. The simulations were based on the

  5. REDUCING POWER PRODUCTION COSTS BY UTILIZING PETROLEUM COKE

    Energy Technology Data Exchange (ETDEWEB)

    Kevin C. Galbreath; Donald L. Toman; Christopher J. Zygarlicke

    1999-09-01

    Petroleum coke, a byproduct of the petroleum-refining process, is an attractive primary or supplemental fuel for power production primarily because of a progressive and predictable increase in the production volumes of petroleum coke (1, 2). Petroleum coke is most commonly blended with coal in proportions suitable to meet sulfur emission compliance. Petroleum coke is generally less reactive than coal; therefore, the cofiring of petroleum coke with coal typically improves ignition, flame stability, and carbon loss relative to the combustion of petroleum coke alone. Although petroleum coke is a desirable fuel for producing relatively inexpensive electrical power, concerns about the effects of petroleum coke blending on combustion and pollution control processes exist in the coal-fired utility industry (3). The Energy & Environmental Research Center (EERC) completed a 2-year technical assessment of petroleum coke as a supplemental fuel. A survey questionnaire was sent to seven electric utility companies that are currently cofiring coal and petroleum coke in an effort to solicit specific suggestions on research needs and fuel selections. An example of the letter and survey questionnaire is presented in Appendix A. Interest was expressed by most utilities in evaluating the effects of petroleum coke blending on grindability, combustion reactivity, fouling, slagging, and fly ash emissions control. Unexpectedly, concern over corrosion was not expressed by the utilities contacted. Although all seven utilities responded to the question, only two utilities, Northern States Power Company (NSP) and Ameren, sent fuels to the EERC for evaluation. Both utilities sent subbituminous coals from the Power River Basin and petroleum shot coke samples. Petroleum shot coke is produced unintentionally during operational upsets in the petroleum refining process. This report evaluates the effects of petroleum shot coke blending on grindability, fuel reactivity, fouling/slagging, and

  6. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  7. Microbial Reverse Electrodialysis Cells for Synergistically Enhanced Power Production

    KAUST Repository

    Kim, Younggy

    2011-07-01

    A new type of bioelectrochemical system for producing electrical power, called a microbial reverse-electrodialysis cell (MRC), was developed to increase voltages and power densities compared to those generated individually by microbial fuel cells (MFCs) or reverse electrodialysis (RED) systems. In RED systems, electrode overpotentials create significant energy losses due to thermodynamically unfavorable electrode reactions, and therefore a large number of stacked cells must be used to have significant energy recovery. This results in high capital costs for the large number of membranes, and increases energy losses from pumping water through a large number of cells. In an MRC, high overpotentials are avoided through oxidation of organic matter by exoelectrogenic bacteria on the anode and oxygen reduction on the cathode. An MRC containing only five pairs of RED cells, fed solutions typical of seawater (600 mM NaCl) and river water (12 mM NaCl) at 0.85 mL/min, produced up to 3.6 W/m2 (cathode surface area) and 1.2-1.3 V with acetate as a substrate. Pumping accounted for <2% of the produced power. A higher flow rate (1.55 mL/min) increased power densities up to 4.3 W/m2. COD removal was 98% with a Coulombic efficiency of 64%. Power production by the individual components was substantially lower with 0.7 W/m2 without salinity driven energy, and <0.015 W/m2 with reduced exoelectrogenic activity due to substrate depletion. These results show that the combination of an MFC and a RED stack synergistically increases performance relative to the individual systems, producing a new type of system that can be used to more efficiently capture salinity driven energy from seawater and river water. © 2011 American Chemical Society.

  8. Optimal construction and combined wind and diesel power production in a regional power purchase

    Energy Technology Data Exchange (ETDEWEB)

    Lautala, P.; Antila, H.; Raekkoelaeinen, J.; Heikkilae, H. [Tampere Univ. of Technology (Finland). Automation and Control Inst.

    1998-12-31

    A weak electricity transmission and distribution network and a wind generator were modelled by a non-linear dynamic model. Energy purchase of a small utility was modelled as a linear mixed integer optimisation problem. The dynamic model was used to simulate the effects of distance between the wind generator and a regional power grid and the effects of changes in the production of the wind generator. The optimisation model was used to investigate the effect of the combined diesel and wind production. In this case the results show that if the distance between the generator and the network grid is more than 70 km, then voltage fluctuations exceed acceptable levels. The optimisation provides the value of the combined diesel and wind production. (orig.)

  9. Revolutionising landscapes: Hydroelectricity and the heavy industrialisation of society and environment in the Comte de Beauharnois, 1927--1948

    Science.gov (United States)

    Pelletier, Louis-Raphael

    This dissertation analyses the rapid industrialisation of the rural Comte de Beauharnois and the adjacent stretch of the Fleuve Saint-Laurent owing to the construction, between 1929 and 1948, of a gigantic canal for hydroelectricity production and navigation by an electricity corporation called the Beauharnois Light Heat and Power (BLH&P). Using principally the archives of the BLH&P---especially its complaints files and its rich photographic record---this thesis argues that this process exemplifies the finance capitalist reorganisation of the society and ecosystems of the Canadian province of Quebec from the 19th century to the Great Depression. In keeping with recent work in environmental history, the transformation of rural landscapes and a river for heavy industry is described as an important dimension of a revolution in modes of production. More specifically, I argue that, in the case under study, the finance-capitalist reorganisation of Quebec revolved around two central and explicit projects, one social and the other environmental: the grouping of most individuals in an industrial working class without control over the means of production and the reorganisation of rural landscapes into reservoirs of modern energy and industrial natural resources.

  10. 78 FR 52758 - Subzone 33D; Application for Subzone Expansion; Mitsubishi Electric Power Products Inc...

    Science.gov (United States)

    2013-08-26

    ... Electric Power Products Inc.; Southwestern Pennsylvania An application has been submitted to the Foreign..., requesting additional sites within Subzone 33D on behalf of Mitsubishi Electric Power Products Inc. (MEPPI...

  11. Innovative applications of technology for nuclear power plant productivity improvements

    Energy Technology Data Exchange (ETDEWEB)

    Naser, J. A. [Electric Power Research Inst., 3420 Hillview Avenue, Palo Alto, CA 94303 (United States)

    2012-07-01

    The nuclear power industry in several countries is concerned about the ability to maintain high plant performance levels due to aging and obsolescence, knowledge drain, fewer plant staff, and new requirements and commitments. Current plant operations are labor-intensive due to the vast number of operational and support activities required by commonly used technology in most plants. These concerns increase as plants extend their operating life. In addition, there is the goal to further improve performance while reducing human errors and increasingly focus on reducing operations and maintenance costs. New plants are expected to perform more productively than current plants. In order to achieve and increase high productivity, it is necessary to look at innovative applications of modern technologies and new concepts of operation. The Electric Power Research Inst. is exploring and demonstrating modern technologies that enable cost-effectively maintaining current performance levels and shifts to even higher performance levels, as well as provide tools for high performance in new plants. Several modern technologies being explored can provide multiple benefits for a wide range of applications. Examples of these technologies include simulation, visualization, automation, human cognitive engineering, and information and communications technologies. Some applications using modern technologies are described. (authors)

  12. Coordination of wind and water power. Better utilization of network and room for more wind power; Samkoeyring av vind- og vasskraft. Betre utnytting av nett og plass til meir vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    Stensby, Kjell Erik; Hamnaberg, Haavard (eds.)

    2011-01-15

    The report describes the results of the simulation of coordination of wind power with Guolas hydro power plants in Troms. The simulations have been carried out by SINTEF Energy Research, and the purpose has been to consider to what degree it is possible to make room for more wind power in grid if the hydroelectric plant was driven with regard to wind power production. The results show that it is possible to make room for more wind power if it is granted 'priority' in the power grid. (AG)

  13. Theoretical Research of Coal Gasification Products Burning in Boilers at Tomsk Thermal Power Plant-3

    Directory of Open Access Journals (Sweden)

    Somov A.A.

    2015-01-01

    Full Text Available Mathematical modeling of primary fuel change into power gas in power generating boiler with productivity of steam 160 t\\h was done. Research of aggregate work on some power modes was completed. Characteristic curves of efficiency coefficient at different loads and ratio on power and natural gases burning were made. Practicability of power gas use as fuel was proved.

  14. INNOVATIVE TECHNOLOGICAL SOLUTIONS IN CREATING FUNCTIONAL PRODUCTS POWER

    Directory of Open Access Journals (Sweden)

    I. V. Sergienko

    2015-01-01

    Full Text Available The article deals with a problem of functional products creation for consumers feeling need in proteins, irreplaceable amino acids, vitamins, mineral substances, food fibers, polynonsaturated fat acids. One of the possible ways to improve human nutrition is using non-traditional cultures for bread making technology containing significant amounts of fibrous substances, easily digestible protein, vitamins, unsaturated fatty acids and minerals. Taking into account the Nutrition Science requirements an expediency of the most full functional ingredients complex entering into bakery products prescription structure is proved. Replacement of the first grade wheat flour by the offered prescription composition allows to slow down a bread aging, to increase periods of products storage and to improve their physical and chemical indicators on the specific volume and porosity. The bakery products "Svyatogor" at the use of 100 g of a product allow to cover daily need in protein for 38,9%, in carbohydrates – for 3,4%, fat – for 9,2%. The power value of "Svyatogor" is 897 kJ, in control 959. Biological value, % 82,7 against 53,1 in control. Thanks to it the digestibility of bread protein (in vitro method of “Svyatogor” is higher. Thanks to unique properties of the compounding components “Svyatogor” gets functional properties by full-fledged protein increasing and its best comprehensibility (in vitro, advanced structure according to the content of vitamins, mineral substances, their balanced structure and can be recommended for mass consumption and prevention of osteoporosis, atherosclerosis, anemia, for children food, pregnant women and the feeding women.

  15. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Washington Facilities (Intrastate) Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack

    1984-11-01

    This report was prepared for BPA in fulfillment of section 1004 (b)(1) of the Pacific Northwest Electric Power Planning and Conservation Act of 1980, to review the status of past, present, and proposed future wildlife planning and mitigation program at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Projects addressed are: Merwin Dam; Swift Project; Yale Project; Cowlitz River; Boundary Dam; Box Canyon Dam; Lake Chelan; Condit Project; Enloe Project; Spokane River; Tumwater and Dryden Dam; Yakima; and Naches Project.

  16. Utilization of hydraulic mini-power stations in rural zones

    Energy Technology Data Exchange (ETDEWEB)

    Pontier, R. (Societe Neyrpic, 38 - Grenoble (France))

    1982-10-01

    It is explained on a specific case how hydroelectric mini-power stations can be associated to a hydraulic dam to feed electric power to the water treatment works and to supply peak load power to the grid.

  17. Optimization of wind farm power production using innovative control strategies

    DEFF Research Database (Denmark)

    Duc, Thomas

    Wind energy has experienced a very significant growth and cost reduction over the past decade, and is now able to compete with conventional power generation sources. New concepts are currently investigated to decrease costs of production of electricity even further. Wind farm coordinated control...... is one of them; it is aimed at increasing the efficiency of a wind farm and decreasing the fatigue loads faced by wind turbines by reducing aerodynamic interactions between them. These objectives are achieved considering two different strategies: curtailing an upwind turbine to reduce the wind speed...... conditions. It is therefore not known to what extent these gains can be reproduced in a real wind farm where wind conditions are very fluctuating. The French national project SMARTEOLE constitutes one of the first attempts of implementing these strategies on a full scale wind farm. A ten month measurement...

  18. Grate-firing of biomass for heat and power production

    DEFF Research Database (Denmark)

    Yin, Chungen; Rosendahl, Lasse; Kær, Søren Knudsen

    2008-01-01

    bed on the grate, and the advanced secondary air supply (a real breakthrough in this technology) are highlighted for grate-firing systems. Amongst all the issues or problems associated with grate-fired boilers burning biomass, primary pollutant formation and control, deposition formation and corrosion......As a renewable and environmentally friendly energy source, biomass (i.e., any organic non-fossil fuel) and its utilization are gaining an increasingly important role worldwide Grate-firing is one of the main competing technologies in biomass combustion for heat and power production, because it can...... fire a wide range of fuels of varying moisture content, and requires less fuel preparation and handling. The basic objective of this paper is to review the state-of-the-art knowledge on grate-fired boilers burning biomass: the key elements in the firing system and the development, the important...

  19. Influence of wind turbine flexibility on loads and power production

    Science.gov (United States)

    Ahlström, Anders

    2006-05-01

    Most aeroelastic codes used today assume small blade deflections and application of loads on the undeflected structure. However, with the design of lighter and more flexible wind turbines, this assumption is not obvious. By scaling the system mass and stiffness properties equally, it is possible to compare wind turbines of different degrees of slenderness and at the same time keep system frequencies the same in an undeformed state. The developed model uses the commercial finite element system MSC. Marc, focused on non-linear design and analysis, to predict the structural response. The aerodynamic model AERFORCE, used to transform the wind to loads on the blades, is a blade element momentum model. A comparison is made between different slenderness ratios in three wind conditions below rated wind speed. The results show that large blade deflections have a major influence on power production and the resulting structural loads and must be considered in the design of very slender turbines. Copyright

  20. Staging Rankine Cycles Using Ammonia for OTEC Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, D.

    2011-03-01

    Recent focus on renewable power production has renewed interest in looking into ocean thermal energy conversion (OTEC) systems. Early studies in OTEC applicability indicate that the island of Hawaii offers a potential market for a nominal 40-MWe system. a 40-MWe system represents a large leap in the current state of OTEC technology. Lockheed Martin Inc. is currently pursuing a more realistic goal of developing a 10-MWe system under U.S. Navy funding (Lockheed 2009). It is essential that the potential risks associated with the first-of-its-kind plant should be minimized for the project's success. Every means for reducing costs must also be pursued without increasing risks. With this in mind, the potential for increasing return on the investment is assessed both in terms of effective use of the seawater resource and of reducing equipment costs.

  1. Tazimina Hydroelectric Project, Iliamna, Alaska Final Technical and Construction Cost Report

    Energy Technology Data Exchange (ETDEWEB)

    HDR Alaska, Inc.

    1998-11-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. These communities have a combined population of approximately 600 residents. There is no direct road connection from these villages to larger population centers. Electric power has been generated by INNEC since 1983 using diesel generators located in the community of Newhalen. Fuel for these generators was transported up the Kvichak River, an important salmon river, and across Iliamna Lake. In dry years the river is low and fuel is flown into Iliamna and then trucked five miles into Newhalen. The cost, difficult logistics and potential spill hazard of this fuel was a primary reason for development of hydroelectric power in this area. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  2. Electric power generation the changing dimensions

    CERN Document Server

    Tagare, D M

    2011-01-01

    "This book offers an analytical overview of established electric generation processes, along with the present status & improvements for meeting the strains of reconstruction. These old methods are hydro-electric, thermal & nuclear power production. The book covers climatic constraints; their affects and how they are shaping thermal production. The book also covers the main renewable energy sources, wind and PV cells and the hybrids arising out of these. It covers distributed generation which already has a large presence is now being joined by wind & PV energies. It covers their accommodation in the present system. It introduces energy stores for electricity; when they burst upon the scene in full strength are expected to revolutionize electricity production. In all the subjects covered, there are references to power marketing & how it is shaping production. There will also be a reference chapter on how the power market works"--Provided by publisher.

  3. A comparison of design features of 80 pv-powered products

    NARCIS (Netherlands)

    Apostolou, G.; Reinders, A.H.M.E.

    2012-01-01

    In this paper 80 commercially available PV products have been analysed. The data set comprises 46 low power PV products in the range of 0 to 17 Wp and 34 PV products with a power of 17 Wp up to 27 kWp. The goal of our study is to investigate and evaluate features of PV products that are available on

  4. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  5. From local wind energy resource to national wind power production

    Directory of Open Access Journals (Sweden)

    Wolf-Gerrit Früh

    2015-02-01

    Full Text Available Wind power is one of the most established renewable power resources yet it is also one of the most volatile resources. This poses a key challenge for successfully integrating wind power at a large scale into the power grid. Here we present an analysis of the time scales associated with wind power from hourly to seasonal fluctuations and how combining spatially distributed wind power sources helps to reduce its volatility. The analysis, based on observed wind speeds, is then generalised in a simple statistical model to develop a tool which can estimate the power output profile from a particular consortium of wind power sources. As the estimator only uses the local, or the mean national, wind resource and the mean distance between the sites to estimate the joint power output profile, it can be used by developers to estimate the reliability of their joint power output and to form the most effective consortium.

  6. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy... and Wildlife Service for the proposed Eagle Mountain Pumped Storage Hydroelectric Project. This...

  7. High efficiency power production from biomass and waste

    Energy Technology Data Exchange (ETDEWEB)

    Rabou, L.P.L.M.; Van Leijenhorst, R.J.C.; Hazewinkel, J.H.O. [ECN Biomass, Coal and Environment, Petten (Netherlands)

    2008-11-15

    Two-stage gasification allows power production from biomass and waste with high efficiency. The process involves pyrolysis at about 550C followed by heating of the pyrolysis gas to about 1300C in order to crack hydrocarbons and obtain syngas, a mixture of H2, CO, H2O and CO2. The second stage produces soot as unwanted by-product. Experimental results are reported on the suppression of soot formation in the second stage for two different fuels: beech wood pellets and Rofire pellets, made from rejects of paper recycling. Syngas obtained from these two fuels and from an industrial waste fuel has been cleaned and fed to a commercial SOFC stack for 250 hours in total. The SOFC stack showed comparable performance on real and synthetic syngas and no signs of accelerated degradation in performance over these tests. The experimental results have been used for the design and analysis of a future 25 MWth demonstration plant. As an alternative, a 2.6 MWth system was considered which uses the Green MoDem approach to convert waste fuel into bio-oil and syngas. The 25 MWth system can reach high efficiency only if char produced in the pyrolysis step is converted into additional syngas by steam gasification, and if SOFC off-gas and system waste heat are used in a steam bottoming cycle for additional power production. A net electrical efficiency of 38% is predicted. In addition, heat can be delivered with 37% efficiency. The 2.6 MWth system with only a dual fuel engine to burn bio-oil and syngas promises nearly 40% electrical efficiency plus 41% efficiency for heat production. If syngas is fed to an SOFC system and off-gas and bio-oil to a dual fuel engine, the electrical efficiency can rise to 45%. However, the efficiency for heat production drops to 15%, as waste heat from the SOFC system cannot be used effectively. The economic analysis makes clear that at -20 euro/tonne fuel, 70 euro/MWh for electricity and 7 euro/GJ for heat the 25 MWth system is not economically viable at the

  8. Recuperação de área degradada por construção de hidroelétrica com adubação verde e corretivo Soil reclamation by green manure and soil ammendements in areas degraded by hydroelectric power plant construction

    Directory of Open Access Journals (Sweden)

    Marlene Cristina Alves

    2008-12-01

    Full Text Available As "áreas de empréstimo" em hidrelétricas são as áreas remanescentes da construção da fundação da barragem e podem ser consideradas áreas degradadas, pois delas foram retirados os horizontes superficiais do solo. Este trabalho teve como objetivo estudar a recuperação de um Latossolo Vermelho distrófico, degradado por construção civil (Usina Hidrelétrica de Ilha Solteira-SP, por meio de adubação verde e aplicação de calagem e gessagem. Os tratamentos constituíram-se de: testemunha (solo mobilizado e vegetação espontânea; mucuna-preta e guandu até 1994. Depois foram substituídos por feijão-de-porco; calcário + mucuna-preta; calcário + guandu até 1994. Nova substituição foi feita por feijão-de-porco; calcário + gesso + mucuna-preta e calcário + gesso + guandu até 1994. Outra substituição foi feita por feijão-de-porco. Esses tratamentos foram estabelecidos em blocos casualizados com quatro repetições: após quatro anos com os adubos verdes, um ano com milho, um ano com aveia-preta e dois anos com braquiária. Foram avaliados: pH, teores de Ca2+, Mg2+, P, K, capacidade de troca catiônica, saturação por bases e teor de matéria orgânica. Os tratamentos adotados estão recuperando os atributos químicos do solo degradado, e a mucuna-preta apresentou os melhores resultados, quando comparada ao guandu e feijão-de-porco. Os efeitos da recuperação dos atributos químicos do solo alcançaram a profundidade de 0,0-0,2 m. As técnicas adotadas para recuperação desses atributos químicos (adubação verde, calagem e gessagem no primeiro ano atingiram a profundidade do solo de 0,0-0,1 m e, somente após cinco anos, de 0,0-0,2 m.Loan areas near hydroelectric power plants can be considered degraded areas since they were stripped of their soil surface horizons. This study aimed to investigate the recovery of soil chemical attributes of a Red Latosol (Oxisol used in the embankment and fill of the hydroelectric

  9. Operational costs induced by fluctuating wind power production in Germany and Scandinavia

    DEFF Research Database (Denmark)

    Meibom, Peter; Weber, C.; Barth, R.

    2009-01-01

    and will therefore influence the operational costs induced by wind power production. A method is applied for calculating the change in operational costs due to wind power production using a stochastic optimisation model covering the power systems in Germany and the Nordic countries. Two cases of alternative...

  10. Efficiency mark of the two-product power complex of nuclear power plant

    Science.gov (United States)

    Khrustalev, V. A.; Suchkov, V. M.

    2017-11-01

    The article discusses the combining nuclear power plants (NPP) with pressurized water reactors and distillation-desalination plants (DDP), their joint mode of operation during periods of coating failures of the electric power load graphs and thermo-economical efficiency. Along with the release of heat and generation of electric energy a desalination complex with the nuclear power plant produces distillate. Part of the selected steam “irretrievably lost” with a mix of condensation of this vapor in a desalination machine with a flow of water for distillation. It means that this steam transforms into condition of acquired product - distillate. The article presents technical solutions for the return of the working fluid for turbine К-1000-60/1500-2 и К-1200-6,8/50, as well as permissible part of low pressure regime according to the number of desalination units for each turbine. Patent for the proposed two-product energy complex, obtained by Gagarin State Technical University is analyzed. The energy complex has such system advantages as increasing the capacity factor of a nuclear reactor and also allows to solve the problem of shortage of fresh water. Thermo-economics effectiveness of this complex is determined by introducing a factor-“thermo-economic index”. During analyzing of the results of the calculations of a thermo-economic index we can see a strong influence of the cost factor of the distillate on the market. Then higher participation of the desalination plant in coverage of the failures of the graphs of the electric loading then smaller the payback period of the NPP. It is manifested more clearly, as it’s shown in the article, when pricing options depend on time of day and the configuration of the daily electric load diagram. In the geographical locations of the NPPs with PWR the Russian performance in a number of regions with low freshwater resources and weak internal electrical connections combined with DDP might be one of the ways to improve the

  11. Feasibility Study of Hydrogen Production at Existing Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Stephen Schey

    2009-07-01

    Cooperative Agreement DE-FC07-06ID14788 was executed between the U.S. Department of Energy, Electric Transportation Applications, and Idaho National Laboratory to investigate the economics of producing hydrogen by electrolysis using electricity generated by nuclear power. The work under this agreement is divided into the following four tasks: Task 1 – Produce Data and Analyses Task 2 – Economic Analysis of Large-Scale Alkaline Electrolysis Task 3 – Commercial-Scale Hydrogen Production Task 4 – Disseminate Data and Analyses. Reports exist on the prospect that utility companies may benefit from having the option to produce electricity or produce hydrogen, depending on market conditions for both. This study advances that discussion in the affirmative by providing data and suggesting further areas of study. While some reports have identified issues related to licensing hydrogen plants with nuclear plants, this study provides more specifics and could be a resource guide for further study and clarifications. At the same time, this report identifies other area of risks and uncertainties associated with hydrogen production on this scale. Suggestions for further study in some of these topics, including water availability, are included in the report. The goals and objectives of the original project description have been met. Lack of industry design for proton exchange membrane electrolysis hydrogen production facilities of this magnitude was a roadblock for a significant period. However, recent design breakthroughs have made costing this facility much more accurate. In fact, the new design information on proton exchange membrane electrolyzers scaled to the 1 kg of hydrogen per second electrolyzer reduced the model costs from $500 to $100 million. Task 1 was delayed when the original electrolyzer failed at the end of its economic life. However, additional valuable information was obtained when the new electrolyzer was installed. Products developed during this study

  12. Hybrid Cooling Systems for Low-Temperature Geothermal Power Production

    Energy Technology Data Exchange (ETDEWEB)

    Ashwood, A.; Bharathan, D.

    2011-03-01

    This paper describes the identification and evaluation of methods by which the net power output of an air-cooled geothermal power plant can be enhanced during hot ambient conditions with a minimal amount of water use.

  13. University-Company Cooperation in a Hydroelectric Plant: Cooperation Study in Environmental Management

    Directory of Open Access Journals (Sweden)

    Fabricio Mussi

    2017-05-01

    Full Text Available Hydroelectric power plants are considered strategic for the country when considering their relevance and impact on other sectors of the economy. However, the dynamics of the operation of a plant, its support structure and power generation activities can cause impacts on the environment, which must be constantly monitored in order to mitigate any environmental risks. The purpose of this study is to examine the partnership relations between a plant by menas of the creation of a department within the environmental management and universities and research institutes to identify specific partnerships in environmental management and hydroelectric plants. Six projects have been selected for analysis, four of them related to projects with universities and two related to cooperation with research institutes. The focus of the analysis was restricted to the main points observed in the management of these partnerships, which are: (a motivation for establishing partnerships, (b the composition of the estimated costs for implementing these partnerships, (c the difficulties of reconciling technical management and financial management, and (d the measurement of results and contributions from these interactions. Administrative practices of management of partnerships were also analyzed in the stages preceding cooperation for cooperation and further cooperation. Although other such studies are needed to strengthen the findings presented, one can conclude that the purposes of the establishment of cooperation in environmental management differ from those observed in other fields of knowledge such as engineering and biotechnology, for example.

  14. A model for the data extrapolation of greenhouse gas emissions in the Brazilian hydroelectric system

    Science.gov (United States)

    Pinguelli Rosa, Luiz; Aurélio dos Santos, Marco; Gesteira, Claudio; Elias Xavier, Adilson

    2016-06-01

    Hydropower reservoirs are artificial water systems and comprise a small proportion of the Earth’s continental territory. However, they play an important role in the aquatic biogeochemistry and may affect the environment negatively. Since the 90s, as a result of research on organic matter decay in manmade flooded areas, some reports have associated greenhouse gas emissions with dam construction. Pioneering work carried out in the early period challenged the view that hydroelectric plants generate completely clean energy. Those estimates suggested that GHG emissions into the atmosphere from some hydroelectric dams may be significant when measured per unit of energy generated and should be compared to GHG emissions from fossil fuels used for power generation. The contribution to global warming of greenhouse gases emitted by hydropower reservoirs is currently the subject of various international discussions and debates. One of the most controversial issues is the extrapolation of data from different sites. In this study, the extrapolation from a site sample where measurements were made to the complete set of 251 reservoirs in Brazil, comprising a total flooded area of 32 485 square kilometers, was derived from the theory of self-organized criticality. We employed a power law for its statistical representation. The present article reviews the data generated at that time in order to demonstrate how, with the help of mathematical tools, we can extrapolate values from one reservoir to another without compromising the reliability of the results.

  15. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Federal Energy Regulatory Commission White Mountain Hydroelectric Corp.; Notice of Application for....: 11313-019. c. Date Filed: March 31, 2010. d. Applicant: White Mountain Hydroelectric Corp. e. Name of... Contact: Peter Govoni, White Mountain Hydroelectric Corp., P.O. Box 715, Lincoln, New Hampshire 03251...

  16. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter - September 1982

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-09-01

    In the Third Quarter of 1982, the number of signed contracts and committed projects rose from 148 to 173, with a total estimated nominal capacity of these projects of 922 MW. Of this nominal capacity, about 168 MW is operational, and the balance is under contract for development. Of the 173 signed contracts and committed projects, 61 were cogeneration and solid waste projects with a potential of 643 MW. PG and E also had under active discussion 28 cogeneration projects that could generate a total of 968 MW to 1,049 MW, and 10 solid waste projects with a potential of 90 MW to 95 MW. Wind projects under contract number 84, with a generating capability of 85 MW. Also, discussions are being conducted with 17 wind projects, totaling 83 MW. There are 23 hydroelectric projects with signed contracts and a potential of 95 MW, as well as 63 projects under active discussion for 169 MW. In addition, there are 25 hydroelectric projects, with a nominal capacity of 278 MW, that PG and E is constructing or planning to construct. Five contracts have been signed with projects, using other types of electric power generation, capable of producing 100 MW.

  17. ANALYSIS OF GROSS REGIONAL PRODUCT FLUCTUATIONS AND ELECTRIC POWER CONSUMPTION IN 2005- 2014. RESERVES FOR DECREASING ELECTRIC POWER PRICES

    Directory of Open Access Journals (Sweden)

    Suslov N. I.

    2016-09-01

    Full Text Available In this work we considered the trajectories of change in indicators characterizing the status of economics and power industry: gross regional product, electric power consumption, industrial production, energy prices and costs of delivering electric power to consumers in Russian regions for the last 10 years. Low global commodity prices and sanctions led to a sharp decrease of equipment import, which resulted in an acute problem of import substitution. The level of tariffs of natural monopolies is of great importance for industrial development. The goal of this work was to analyze possibilities for reducing electric power prices by changing the institutional and economic conditions of management. We analyzed not only the official information from Rosstat, but also government regulations, figures given in the official government publication «The Rossiyskaya Gazeta» as well as articles and interviews on economic problems of the electric power industry over the recent years published in «The Kommersant» newspaper. High tariffs of network marketing companies for electric energy transmission, state regulation of heating prices, financing the construction of new capacities by charging the payment in power provision contracts, high price of electric power of nuclear power plants lead to an annual increase in electric power prices for end users. In this work we considered possible solutions to limit the growth of electric power prices.

  18. Flow-Induced Pulsation and Vibration in Hydroelectric Machinery Engineer’s Guidebook for Planning, Design and Troubleshooting

    CERN Document Server

    Dörfler, Peter; Coutu, André

    2013-01-01

    Since the 1970’s, an increasing amount of specialized research has focused on the problems created by instability of internal flow in hydroelectric power plants. However, progress in this field is hampered by the inter­disciplinary nature of the subject, between fluid mechanics, structural mechanics and hydraulic transients. Flow-induced Pulsation and Vibration in Hydroelectric Machinery provides a compact guidebook explaining the many different underlying physical mechanisms and their possible effects.   Typical phenomena are described to assist in the proper diagnosis of problems and various key strategies for solution are compared and considered with support from practical experience and real-life examples. The link between state-of the-art CFD computation and notorious practical problems is discussed  and quantitative data is provided on  normal levels of vibration and pulsation so realistic limits can be set for future projects. Current projects are also addressed as the possibilities and limitatio...

  19. Status Review of Wildlife Mitigation at 14 of 27 Major Hydroelectric Projects in Idaho, 1983-1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Martin, Robert C.; Mehrhoff, L.A.

    1985-01-01

    The Pacific Northwest Electric Power Planning and Conservation Act and wildlife and their habitats in the Columbia River Basin and to compliance with the Program, the wildlife mitigation status reports coordination with resource agencies and Indian Tribes. developed the Columbia River Basin Fish and Wildlife Program development, operation, and maintenance of hydroelectric projects on existing agreements; and past, current, and proposed wildlife factual review and documentation of existing information on wildlife meet the requirements of Measure 1004(b)(l) of the Program. The mitigation, enhancement, and protection activities were considered. In mitigate for the losses to those resources resulting from the purpose of these wildlife mitigation status reports is to provide a resources at some of the Columbia River Basin hydroelectric projects the river and its tributaries. To accomplish this goal, the Council were written with the cooperation of project operators, and in within Idaho.

  20. Membrane-based processes for sustainable power generation using water.

    Science.gov (United States)

    Logan, Bruce E; Elimelech, Menachem

    2012-08-16

    Water has always been crucial to combustion and hydroelectric processes, but it could become the source of power in membrane-based systems that capture energy from natural and waste waters. Two processes are emerging as sustainable methods for capturing energy from sea water: pressure-retarded osmosis and reverse electrodialysis. These processes can also capture energy from waste heat by generating artificial salinity gradients using synthetic solutions, such as thermolytic salts. A further source of energy comes from organic matter in waste waters, which can be harnessed using microbial fuel-cell technology, allowing both wastewater treatment and power production.

  1. Membrane-based processes for sustainable power generation using water

    KAUST Repository

    Logan, Bruce E.

    2012-08-15

    Water has always been crucial to combustion and hydroelectric processes, but it could become the source of power in membrane-based systems that capture energy from natural and waste waters. Two processes are emerging as sustainable methods for capturing energy from sea water: pressure-retarded osmosis and reverse electrodialysis. These processes can also capture energy from waste heat by generating artificial salinity gradients using synthetic solutions, such as thermolytic salts. A further source of energy comes from organic matter in waste waters, which can be harnessed using microbial fuel-cell technology, allowing both wastewater treatment and power production. © 2012 Macmillan Publishers Limited. All rights reserved.

  2. Offshore Wind Power Production in Critical Weather Conditions

    DEFF Research Database (Denmark)

    Cutululis, Nicolaos Antonio; Litong-Palima, Marisciel; Sørensen, Poul Ejnar

    2012-01-01

    Critical weather conditions, i.e. extreme winds will raise a lot of challenges when it comes to the secure operation of the whole European electric system with the future large scale offshore wind power. This is especially true for Denmark where the target is that wind power should provide 50...

  3. Environmental costs associated to the electric generation: hydroelectric versus natural gas thermoelectric; Custos ambientais associados a geracao eletrica: hidreletricas versus termeletricas a gas natural

    Energy Technology Data Exchange (ETDEWEB)

    Reis, Marcelo de Miranda

    2001-01-15

    This works presents the methodologies for valuation of the environmental costs resulting from the main damages of the cycles of electric energy arrange through hydroelectric and natural gas thermoelectric. Initially theoretical concepts are established, embracing: the description of the valuation methodologies, the possible ways of damages internalization in the value of the products, the environmental impacts of hydroelectric and natural gas thermoelectric in these fuel cycles, and the methodologies that can be applied for value the main damages caused by the impacts. Then case studies are developed, with application of the methodologies in the hydroelectric plants of Simplicio and Serra da Mesa, and in the thermoelectric complex composed for RioGen and RioGen Merchant plants. Finally, conclusions and recommendations for a better future application in Brazil of the valuation methodologies are presented. (author)

  4. Analysis of environmental issues related to small-scale hydroelectric development. III. Water level fluctuation

    Energy Technology Data Exchange (ETDEWEB)

    Hildebrand, S.G. (ed.)

    1980-10-01

    Potential environmental impacts in reservoirs and downstream river reaches below dams that may be caused by the water level fluctuation resulting from development and operation of small scale (under 25MW) hydroelectric projects are identified. The impacts discussed will be of potential concern at only those small-scale hydroelectric projects that are operated in a store and release (peaking) mode. Potential impacts on physical and chemical characteristics in reservoirs resulting from water level fluctuation include resuspension and redistribution of bank and bed sediment; leaching of soluble organic matter from sediment in the littoral zone; and changes in water quality resulting from changes in sediment and nutrient trap efficiency. Potential impacts on reservoir biota as a result of water level fluctuation include habitat destruction and the resulting partial or total loss of aquatic species; changes in habitat quality, which result in reduced standing crop and production of aquatic biota; and possible shifts in species diversity. The potential physical effects of water level fluctuation on downstream systems below dams are streambed and bank erosion and water quality problems related to resuspension and redistribution of these materials. Potential biological impacts of water level fluctuation on downstream systems below dams result from changes in current velocity, habitat reduction, and alteration in food supply. These alterations, either singly or in combination, can adversely affect aquatic populations below dams. The nature and potential significance of adverse impacts resulting from water level fluctuation are discussed. Recommendations for site-specific evaluation of water level fluctuation at small-scale hydroelectric projects are presented.

  5. Grid-connected in-stream hydroelectric generation based on the doubly fed induction machine

    Science.gov (United States)

    Lenberg, Timothy J.

    Within the United States, there is a growing demand for new environmentally friendly power generation. This has led to a surge in wind turbine development. Unfortunately, wind is not a stable prime mover, but water is. Why not apply the advances made for wind to in-stream hydroelectric generation? One important advancement is the creation of the Doubly Fed Induction Machine (DFIM). This thesis covers the application of a gearless DFIM topology for hydrokinetic generation. After providing background, this thesis presents many of the options available for the mechanical portion of the design. A mechanical turbine is then specified. Next, a method is presented for designing a DFIM including the actual design for this application. In Chapter 4, a simulation model of the system is presented, complete with a control system that maximizes power generation based on water speed. This section then goes on to present simulation results demonstrating proper operation.

  6. Thermal Heat and Power Production with Models for Local and Regional Energy Systems

    Energy Technology Data Exchange (ETDEWEB)

    Saether, Sturla

    1999-07-01

    The primary goal of this thesis is the description and modelling of combined heat and power systems as well as analyses of thermal dominated systems related to benefits of power exchange. Large power plants with high power efficiency (natural gas systems) and heat production in local heat pumps can be favourable in areas with low infrastructure of district heating systems. This system is comparable with typical combined heat and power (CHP) systems based on natural gas with respect to efficient use of fuel energy. The power efficiency obtainable from biomass and municipal waste is relatively low and the advantage of CHP for this system is high compared to pure power production with local heat pumps for heat generation. The advantage of converting pure power systems into CHP systems is best for power systems with low power efficiency and heat production at low temperature. CHP systems are divided into two main groups according to the coupling of heat and power production. Some CHP systems, especially those with strong coupling between heat and power production, may profit from having a thermal heat storage subsystem. District heating temperatures direct the heat to power ratio of the CHP units. The use of absorption chillers driven by district heating systems are also evaluated with respect to enhancing the utilisation of district heating in periods of low heat demand. Power exchange between a thermal dominated and hydropower system is found beneficial. Use of hydropower as a substitute for peak power production in thermal dominated systems is advantageous. Return of base load from the thermal dominated system to the hydropower system can balance in the net power exchange.

  7. Extreme Production Conditions of Photovoltaic Power Plant Operated in Distribution Grid

    Directory of Open Access Journals (Sweden)

    Martin Smocek

    2014-01-01

    Full Text Available Photovoltaic power plants are sources of electrical energy that are very dependent on weather conditions. This paper interests in description of stochastic production of power in photovoltaic power plants and subsequently its impact on the distribution power grid. Stochastic production of power from these sources is considerable and hardly predictable. The aim of this survey is to assess the influence of photovoltaic power plants operation on the daily load diagram with regard to output change difference of active power at the relevant substation. Evaluation is based on real-time synchronous data measuring both on-site photovoltaic power plant operation and on-site electric power line output from the substation. This measurement is used for suggestion of a general calculation methodology for the assessment of the difference of active power at a particular node of the grid under various power changes from the photovoltaic power plant. Statistical methods have been employed to process a methodology in order establish extreme conditions of production power for photovoltaic power plant.

  8. Integration of Lithium-Ion Battery Storage Systems in Hydroelectric Plants for Supplying Primary Control Reserve

    Directory of Open Access Journals (Sweden)

    Fabio Bignucolo

    2017-01-01

    Full Text Available The ever-growing diffusion of renewables as electrical generation sources is forcing the electrical power system to face new and challenging regulation problems to preserve grid stability. Among these, the primary control reserve is reckoned to be one of the most important issues, since the introduction of generators based on renewable energies and interconnected through static converters, if relieved from the primary reserve contribution, reduces both the system inertia and the available power reserve in case of network events involving frequency perturbations. In this scenario, renewable plants such as hydroelectric run-of-river generators could be required to provide the primary control reserve ancillary service. In this paper, the integration between a multi-unit run-of-river power plant and a lithium-ion based battery storage system is investigated, suitably accounting for the ancillary service characteristics as required by present grid codes. The storage system is studied in terms of maximum economic profitability, taking into account its operating constraints. Dynamic simulations are carried out within the DIgSILENT PowerFactory 2016 software environment in order to analyse the plant response in case of network frequency contingencies, comparing the pure hydroelectric plant with the hybrid one, in which the primary reserve is partially or completely supplied by the storage system. Results confirm that the battery storage system response to frequency perturbations is clearly faster and more accurate during the transient phase compared to a traditional plant, since time delays due to hydraulic and mechanical regulations are overpassed. A case study, based on data from an existing hydropower plant and referring to the Italian context in terms of operational constraints and ancillary service remuneration, is presented.

  9. Power plant asset market evaluations: Forecasting the costs of power production

    Energy Technology Data Exchange (ETDEWEB)

    Lefton, S.A.; Grunsrud, G.P. [Aptech Engineering Services, Inc., Sunnyvale, CA (United States)

    1998-12-31

    This presentation discusses the process of evaluating and valuing power plants for sale. It describes a method to forecast the future costs at a power plant using a portion of the past fixed costs, variable energy costs, and most importantly the variable cycling-related wear-and-tear costs. The presentation then discusses how to best determine market share, expected revenues, and then to forecast plant future costs based on future expected unit cycling operations. The presentation concludes with a section on recommendations to power plant buyers or sellers on how to manage the power plant asset and how to increase its market value. (orig.) 4 refs.

  10. 78 FR 1848 - Plutonium-238 Production for Radioisotope Power Systems for National Aeronautics and Space...

    Science.gov (United States)

    2013-01-09

    ... Plutonium-238 Production for Radioisotope Power Systems for National Aeronautics and Space Administration...-238 (Pu-238) for radioisotope power systems (RPSs) to support the National Aeronautics and Space... Radioisotope Power Systems (Draft Consolidation EIS) in 2005 to consolidate the nuclear operations related to...

  11. The production of power in everyday life of organizational practice

    DEFF Research Database (Denmark)

    Busch-Jensen, Peter

    2015-01-01

    This article argues for the value of working with conflicts in social practice as resources for collaboration, learning and development. The interest in conflicts in social practice is rooted in a preoccupation with social power relations and how to understand and analyse power relations from...... a subject-science perspective. Following this interest, a methodological framework, best described as a kind of ‘mobile ethnography’, is discussed and exemplified through an empirical example. A preliminary conceptual framework for understanding power as a capacity for action is presented. The overarching...... ambition of the article is to consider what democratic collaboration and coexistence entails and how it might be supported conceptually and analytically by the notion of conflicts as heuristics for social inquiry and by the notion of power as a capacity for action and social participation....

  12. Thermodynamic Analysis of a Ship Power Plant Operating with Waste Heat Recovery through Combined Heat and Power Production

    OpenAIRE

    Mirko Grljušić; Vladimir Medica; Nikola Račić

    2014-01-01

    The goal of this research is to study a cogeneration plant for combined heat & power (CHP) production that utilises the low-temperature waste energy in the power plant of a Suezmax-size oil tanker for all heating and electricity requirements during navigation. After considering various configurations, a standard propulsion engine operating at maximum efficiency and a CHP Plant with R245fa fluid using a supercritical organic Rankine cycle (ORC) is selected. All the ship heat requirements ...

  13. Offshore Wind Power Production in Critical Weather Conditions

    OpenAIRE

    Cutululis, Nicolaos Antonio; Litong-Palima, Marisciel; Sørensen, Poul Ejnar

    2012-01-01

    Critical weather conditions, i.e. extreme winds will raise a lot of challenges when it comes to the secure operation of the whole European electric system with the future large scale offshore wind power. This is especially true for Denmark where the target is that wind power should provide 50% of the electricity consumption by 2020. In the EU funded project TWENTIES, the demonstration #4 STORM MANAGEMENT aims at demonstrating that adequate coordination mechanisms between offshore wind farms a...

  14. Geographic information system (GIS) simulation of emergency power production from disaster debris in a combined heat and power (CHP) system

    Science.gov (United States)

    Ryals, Christopher Shannon

    The objective of this study is to determine a predicted energy capacity of disaster debris for the production of emergency power using a combined heat and power (CHP) unit. A prediction simulation using geographic information systems (GIS) will use data from past storms to calculate an estimated amount of debris along with an estimated energy potential of said debris. Rather than the expense and burden of transporting woody debris such as downed trees and wood framing materials offsite, they can be processed (sorting and chipping) to provide an onsite energy source to provide power to emergency management facilities such as shelters in schools and hospitals. A CHP unit can simultaneously produce heat, cooling effects and electrical power using various biomass sources. This study surveys the quantity and composition of debris produced for a given classification of disaster and location. A comparison of power efficiency estimates for various disasters is conducted.

  15. ERC product improvement activities for direct fuel cell power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bentley, C.; Carlson, G.; Doyon, J. [and others

    1995-08-01

    This program is designed to advance the carbonate fuel cell technology from the current power plant demonstration status to the commercial design in an approximately five-year period. The specific objectives which will allow attainment of the overall program goal are: (1) Define market-responsive power plant requirements and specifications, (2) Establish the design for a multifuel, low-cost, modular, market-responsive power plant, (3) Resolve power plant manufacturing issues and define the design for the commercial manufacturing facility, (4) Define the stack and BOP equipment packaging arrangement and define module designs, (5) Acquire capability to support developmental testing of stacks and BOP equipment as required to prepare for commercial design, and (6) Resolve stack and BOP equipment technology issues and design, build, and field test a modular commercial prototype power plant to demonstrate readiness for commercial entry. A seven-task program, dedicated to attaining objective(s) in the areas noted above, was initiated in December 1994. Accomplishments of the first six months are discussed in this paper.

  16. Legal factors affecting the financing of small scale hydroelectric projects

    Energy Technology Data Exchange (ETDEWEB)

    Wilson, W.H.; Ringo, M.J.; Forgione, N.

    1983-09-01

    An introduction to the major business organizational options open to small-scale hydroelectric (SSH) projects is given. The major federal income tax treatments of these options are compared. Significant general federal income tax factors affecting SSH projects are reintroduced and explained. Some of the special federal income tax problem areas in SSH development are isolated. Tax benefit flow through or transfer mechanisms are discussed. Tax exempt financing opportunities for private SSH projects are reviewed. (MHR)

  17. Distributed Solar Photovoltaic Power Production - Technology and Benefits

    Energy Technology Data Exchange (ETDEWEB)

    Matos, Al [PSE& G; Stuby, Rick [Petra Solar

    2011-11-02

    As part of its nationally recognized Solar 4 All program, PSE&G has partnered with Petra Solar to deploy the world’s first and largest pole attached solar project. The project, based on Petra Solar’s distributed Smart Solar solution, will create a 40 megawatt solar “virtual power plant.” In deployment as 200,000 individual grid-connected solar power producers on utility poles in PSE&G territory, Petra Solar SunWave® solutions leverage Smart Grid communications and high-tech panel-level inverters to implement a robust system with many technical benefits over traditional solar photovoltaic solutions. The program overview, deployment model, smart grid communications and enabling inverter technology and safety features will be presented, as well the future challenges of, and solutions for, solar power intermittency as photovoltaic penetration on the electric grid increases.

  18. Electric energy production by particle thermionic-thermoelectric power generators

    Science.gov (United States)

    Oettinger, P. E.

    1980-01-01

    Thermionic-thermoelectric power generators, composed of a thin layer of porous, low work function material separating a heated emitter electrode and a cooler collector electrode, have extremely large Seebeck coefficients of over 2 mV/K and can provide significant output power. Preliminary experiments with 20-micron thick (Ba Sr Ca)O coatings, limited by evaporative loss to temperatures below 1400 K, have yielded short circuit current densities of 500 mA/sq cm and power densities of 60 mW/ sq cm. Substantially more output is expected with cesium-coated refractory oxide particle coatings operating at higher temperatures. Practical generators will have thermal-to-electrical efficiencies of 10 to 20%. Further increases can be gained by cascading these high-temperature devices with lower temperature conventional thermoelectric generators.

  19. Enhanced greenhouse gas emission from exposed sediments along a hydroelectric reservoir during an extreme drought event

    Science.gov (United States)

    Jin, Hyojin; Yoon, Tae Kyung; Lee, Seung-Hoon; Kang, Hojeong; Im, Jungho; Park, Ji-Hyung

    2016-12-01

    An active debate has been underway on the magnitude and duration of carbon (C) emissions from hydroelectric reservoirs, yet little attention has been paid to stochastic C emissions from reservoir sediments during extreme climatic events. A rare opportunity for field measurements of CO2 efflux from a hydroelectric reservoir in Korea during an extreme drought event was used to examine how prolonged droughts can affect microbial organic matter processing and the release of CO2, CH4 and N2O from exposed sediments. Chamber measurements of CO2 efflux along an exposed sediment transect, combined with high-frequency continuous sensor measurements of the partial pressure of CO2 (pCO2) in the reservoir surface water, exhibited extraordinary pulses of CO2 from exposed sediments and the turbulent inflowing water in contrast to a small CO2 sink in the main water body of the reservoir and a low efflux of CO2 from the flooded sediment. Significant increases in the production of CO2, CH4 and N2O observed in a laboratory incubation of sediments, together with enhanced activities of phenol oxidase and three hydrolases, indicate a temporary activation of microbial organic matter processing in the drying sediment. The results suggest that drought-triggered pulses of greenhouse gas emission from exposed sediments can offset the C accumulation in reservoir sediments over time scales of years to decades, reversing the trend of declining C emissions from aging reservoirs.

  20. Prevalence of anopheles (Diptera: Culicidae) during sunset in areas of the Itaipu Hydroelectric Power Plant in Guaira County, State of Parana, Brazil; Prevalencia de anofelinos (Diptera: Culicidae) no crepusculo vespertino em areas da Usina Hidreletrica de Itaipu, no Municipio de Guaira, Estado do Parana, Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Guimaraes, Anthony Erico; Mello, Rubens Pinto de; Lopes, Catarina Macedo; Alencar, Jeronimo; Gentile, Carla [Fundacao Inst. Oswaldo Cruz (FIOCRUZ), Rio de Janeiro, RJ (Brazil). Dept. de Entomologia. Lab. de Diptera

    1997-11-01

    Systematic collections of anophelines were conducted from November 1995 to August 1995 from 18:00 to 20:00 hr using Shannon traps and human-bait along the lake margin which forms the Itaipu Hydroelectric Reservoir, State of Parana, Brazil. Species prevalence was studied at 15 min intervals. Anopheles albitarsis sensu latu and An. galvaoi, were the most frequently collected mosquitoes. All Anopheles species populations peaked between 18:45 and 19:30 hr. The observations illustrate the existence of haematophagic activity cycle during the early evening hours: exogenous stimulus (the beginning of sunset) Shannon trap (light attraction) human bait (haematophagy) rest and digestion exogenous stimulus Shannon trap or surrounding vegetation. The greater abundance of An. albitarsis collected in human-bait and Shannon trap suggests it may be a potential malaria vector in the region. (author) 20 refs.

  1. Economic analysis of municipal wastewater utilization for thermoelectric power production

    Energy Technology Data Exchange (ETDEWEB)

    Safari, I.; Walker, M.; Abbasian, J.; Arastoopour, H.; Hsieh, M-K.; Theregowda, R.; Dzombak, D.; Miller, D.

    2011-01-01

    The thermoelectric power industry in the U.S. uses a large amount of freshwater. The large water demand is increasingly a problem, especially for new power plant development, as availability of freshwater for new uses diminishes in the United States. Reusing non-traditional water sources, such as treated municipal wastewater, provides one option to mitigate freshwater usage in the thermoelectric power industry. The amount of freshwater withdrawal that can be displaced with non-traditional water sources at a particular location requires evaluation of the water management and treatment requirements, considering the quality and abundance of the non-traditional water sources. This paper presents the development of an integrated costing model to assess the impact of degraded water treatment, as well as the implications of increased tube scaling in the main condenser. The model developed herein is used to perform case studies of various treatment, condenser cleaning and condenser configurations to provide insight into the ramifications of degraded water use in the cooling loops of thermoelectric power plants. Further, this paper lays the groundwork for the integration of relationships between degraded water quality, scaling characteristics and volatile emission within a recirculating cooling loop model.

  2. Emotional Labour and Governmentality: Productive Power in Childcare

    Science.gov (United States)

    Monrad, Merete

    2017-01-01

    This article examines the interplay between governance and cost-containment efforts in the public sector and the emotional labour and well-being of childcare workers. Care-work researchers have highlighted the complexities of power in emotional labour, such as the fact that emotional labour may simultaneously benefit the individual worker and…

  3. Waste to Energy Power Production at DOE and DOD Sites

    Science.gov (United States)

    2011-01-13

    BiomassHeat and Power USAF: Hill Air Force Base • Landfill Gasto Energy Generation Ameresco independent...coal each year. DOESR– Project Benefits Ameresco independent Hill AFBLandfill Gasto Energy Ameresco independent...AFBRenewable Energy Initiatives Landfill Gasto Energy Electrical Generation (LFGTE) • First of itskind in the USAF/ DOD/ Utah • First Project Under

  4. High Falls Hydroelectric Plant feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    Diezemann, Gustav A.

    1979-07-01

    This study was made in order to determine if re-activating the retired High Falls Hydro Station in New York would result in a more economical generation of some of the power required in the Central Hudson System than is being obtained with the oil-burning thermal plants. The findings show that the construction of a new plant is more economical than rehabilitation of the existing station. All new construction schemes are marginally unattractive at today's costs but are found to become profitable within a short period as alternative energy sources escalate in price. A new powerhouse with an installed capacity of 2390 kW proved most economical, and its construction is recommended.

  5. Modelling and application of modern control techniques to governor and voltage regulator systems of synchronous machines of small hydroelectric power plants; Modelagem e aplicacao de tecnicas de controle moderno a sistemas reguladores de velocidade e tensao de maquinas sincronas de pequenas centrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Claudio Homero Ferreira da

    2002-07-01

    In small hydroelectric plants the control system is quite simplified. It is sometimes mounted in a primitive and archaic way although it is functional. Performance of this system determines the final quality of the energy, stability and physical integrity of the apparatus as well as the whole electric system. Based on the present situation of the electric system, it is noticed a tendency in building and modernizing early small hydroelectric plants in order to increase energy supply very fast with low cost and satisfying environmental constraints. The development of mathematical tools and digital computer facilities have made possible the use of advanced automatic control structures that take into account the process stability even in presence of noise measurement and plant/model mismatch. Physical modifications in the plant are proposed in order to provide significant improvement in closed loop behaviour of the turbine speed and terminal voltage control. The decision ability and flexibility of the computer package to be developed are the major aspects that support this research. It will be intended to incorporate this control computer package into programmable logical controller. Experimental data from CEMIG's Martins Hydro Plant (4 x 2750 KVA), located in Uberlandia, Brazil, were used to identify and validate the system model. Pole placement, optimal control and model predictive control techniques were used to controller design. Perfect modeling and plant/model mismatch were considered in both presence and absence of state observers (full order and reduced order) in order to become accessible unmeasured states. Simulation results show developed controllers are promising for the system regulating. The proposed approaches offer a larger control flexibility taking into account plant/model mismatch and stability questions. These results contribute to a quality energy improvement associated to a cost reduction in energy generation process. (author)

  6. From wind ensembles to probabilistic information about future wind power production - results from an actual application

    DEFF Research Database (Denmark)

    Nielsen, Henrik Aalborg; Nielsen, Torben Skov; Madsen, Henrik

    2006-01-01

    Meteorological ensemble forecasts aim at quantifying the uncertainty of the future development of the weather by supplying several possible scenarios of this development. Here we address the use of such scenarios in probabilistic forecasting of wind power production. Specifically, for each forecast...... horizon we aim at supplying quantiles of the wind power production conditional on the information available at the time at which the forecast is generated. This involves: (i) transformation of meteorological ensemble forecasts into wind power ensemble forecasts and (ii) calculation of quantiles based...... on the wind power ensemble forecasts. Given measurements of power production, representing a region or a single wind farm, we have developed methods applicable for these two steps. While (ii) should in principle be a simple task we found that the probabilistic information contained in the wind power ensembles...

  7. Pricing Electric Power in the Czech Republic and in Selected Countries

    Directory of Open Access Journals (Sweden)

    Eva Mazegue Pavelková

    2016-01-01

    Full Text Available This paper focuses on state intervention in the pricing of electricity from renewable power sources in the Czech Republic when compared with the pricing in the Slovak Republic, Germany, France and Italy. In these countries the state intervention is implemented in different forms, but the critical part of the price is regulated everywhere by the state. The price of electricity is determined by its production costs, which depend on the source from which electricity is produced. The highest cost of electricity is required to generate renewable energy, particularly solar power, while the lowest costs of power are associated with its production by coal-fired and natural gas-fired thermal power plants. However, hydroelectric power plants attain clearly the lowest cost for generating electricity. State intervention includes supporting power generation from renewable power sources by guaranteeing purchase prices.

  8. Potential for solar-powered base-load capacity

    Science.gov (United States)

    Stoll, Brady; Deinert, Mark

    2013-04-01

    In 2010 nuclear power accounted for 27% of electricity production in Japan. The March 2011 disaster at the Fukushima Daiichi power station resulted in the closure of all of Japans nuclear power plants and it remains an open question as to how many will reopen. Even before the loss of nuclear capacity there were efforts in Japan to foster the use of renewable energy, including large-scale solar power. Nuclear power plants in Japan operated beyond base load with excess energy being stored in large scale pumped hydroelectric storage systems. Here we show how coupling these storage systems to rooftop solar systems in Tokyo could compensate for the loss of nuclear power. Data from a study of rooftop space, and a 34-year data set of average daily irradiance in the Tokyo metropolitan area were used. If current generation PV systems were placed on the available rooftop space in greater Tokyo, this coupled system could provide for 20% of Toyo's nuclear capacity with a capacity factor of 0.99. Using pumped hydroelectric storage with six times this rooftop area could completely provide for TEPCO's nuclear capacity with a capacity factor of 0.98.

  9. Complex processing of power plant fly and bottom ashes with production of microspherical products at head stage

    Energy Technology Data Exchange (ETDEWEB)

    A.G. Anshits; O.M. Sharonova; T.A. Vereshchagina; N.N. Anshits; E.V. Rabchevskii [Institute of Chemistry and Chemical Technology (Russian Federation). Siberian Branch of Russian Academy of Sciences

    2003-07-01

    The flowsheet has been proposed for a complex processing of power plant fly and bottom ashes, the head stage in it being generation of concentrates of cenospheres and ferrospheres with subsequent fine classification using separation by size and density, drr and wet magnetic separation in different fields; vacuum degassing to recover perforated microspheres. The stages of separation of magnetic concentrates and concentrated cenosphere products recovered from power plant fly ashes of Irsha-Borodinsky lignite from the Kansk-Achinsk field, coals from the Kuznetsk and Ekibastuz fields with generation of stabilized composition microspherical products have been developed. About 60 microspherical products with the content of total Fe{sub 2}O{sub 3} from 2 to 94 wt.% have been obtained and investigated. General regularity describing the properties of microspheres recovered from fly ashes of different power station coals are found. In particular, over 40 products of stabilized compositions ferrospheres with total Fe{sub 2}O{sub 3} content of 36 to 94 wt.% have been recovered from fly ashes of 6 power plants and described, an analysis has been carried out to determine a dependence of the properties of these on type of power station coals, and possible ranges of application have been shown. Based on the products of pilot-scale separation cenospheres from fly ashes of two power plants the novel functional materials have been created for stabilizing liquid radioactive waste. 7 refs., 5 figs.

  10. Feasibility determination for hydroelectric development at Thermalito Afterbay with STRAFLO turbine-generators. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Mueller, B.L.

    1979-06-01

    This study addresses the development of the Thermalito Afterbay, in California. Presently, the outlet of the afterbay dissipates the afterbay's useful energy through five radial gates into the Feather River complex. The feasibility of constructing a hydroelectric facility to recover this wasted energy through the use of STRAFLO hydro turbines is appraised, and data relevant to the future economic benefits of such a facility as compared to alternate energy alternatives are presented. In addition, the regulatory, ecological, and socio-institutional impacts which form additional considerations to a future thermalito afterbay site development are summarized. The study shows an annual generation potential of 48.82 GWh. The cost of developing the site is estimated to be $23.5 million. Social and environmental effects would be minimal. The final feasibility of development is contingent on power contracts which the state of California will be negotiating in 1983. (LCL)

  11. Power plant start-up demands productive methods and practices

    Energy Technology Data Exchange (ETDEWEB)

    Follett, R.E.

    1993-05-01

    This article examines the factors affecting power plant start-up. The article addresses cogeneration plants in particular. The topics of the article include the start-up schedule, start-up program administration, safety tagging procedure, system boundary identification, mechanical test procedures, electrical test procedures, pre-operational tests, loop calibration reports, performance test procedure, instrument calibration, checkout philosophy, plant start-up organization, plant start-up sequence, operator training, and typical plant start-up conditions.

  12. Power System Mass Analysis for Hydrogen Reduction Oxygen Production on the Lunar Surface

    Science.gov (United States)

    Colozza, Anthony J.

    2009-01-01

    The production of oxygen from the lunar regolith requires both thermal and electrical power in roughly similar proportions. This unique power requirement is unlike most applications on the lunar surface. To efficiently meet these requirements, both solar PV array and solar concentrator systems were evaluated. The mass of various types of photovoltaic and concentrator based systems were calculated to determine the type of power system that provided the highest specific power. These were compared over a range of oxygen production rates. Also a hybrid type power system was also considered. This system utilized a photovoltaic array to produce the electrical power and a concentrator to provide the thermal power. For a single source system the three systems with the highest specific power were a flexible concentrator/Stirling engine system, a rigid concentrator/Stirling engine system and a tracking triple junction solar array system. These systems had specific power values of 43, 34, and 33 W/kg, respectively. The hybrid power system provided much higher specific power values then the single source systems. The best hybrid combinations were the triple junction solar array with the flexible concentrator and the rigid concentrator. These systems had a specific power of 81 and 68 W/kg, respectively.

  13. Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

    Energy Technology Data Exchange (ETDEWEB)

    Dan Wendt; Greg Mines

    2014-09-01

    Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

  14. The power of product innovation: Smokers' perceptions of capsule cigarettes.

    Science.gov (United States)

    Moodie, Crawford; Ford, Allison; Dobbie, Fiona; Thrasher, James F; McKell, Jennifer; Purves, Richard

    2017-08-30

    Since being brought to market in 2007, cigarettes with capsules in the filter that can be burst to change the flavour have had remarkable global success, highlighting the importance of product innovation for tobacco companies. Very few studies have explored how these products are perceived by smokers however. This paper sought to address this gap by exploring smokers' awareness of cigarettes with one or two flavour-changing capsules in the filter and the appeal of these products. Twenty focus groups were conducted in Glasgow and Edinburgh in 2015 with current smokers (N=120), segmented by age (16-17, 18-24, 25-35, 36-50, >50), gender and social grade. Awareness, use and appeal of capsule cigarettes was greater among younger adults (16-35 years), who showed most interest in these products. Those who perceived capsules positively mentioned multiple benefits: the ability to burst the capsule, convenience of being able to share cigarettes among menthol and non-menthol smokers, better taste, fresher breath, reduced smell and greater discretion. It was suggested that capsule cigarettes, particularly the double capsule cigarette (which had two differently flavoured capsules in the filter), would encourage non-smokers to experiment with smoking and discourage smokers from quitting. The findings offer some reasons behind the global growth of the capsule cigarette segment. Cigarettes with flavour-changing capsules in the filter have been one of the most successful product innovations of the last decade for tobacco companies. They have received very little academic attention however. Employing focus groups with 120 smokers aged 16 and over, we found that capsule cigarettes held most appeal to, and were considered to be targeted at, younger people, with it suggested that these products would encourage initiation and discourage cessation. This study provides some understanding of how these products are viewed by smokers.

  15. Underground Pumped Storage Hydroelectricity using Abandoned Works (open pits and deep mines)

    Science.gov (United States)

    Pujades, E.; Willems, T.; Bodeux, S.; Orban, P.; Dassargues, A.

    2015-12-01

    Pumped Storage Hydroelectricity (PSH) is a good alternative to increase the efficiency of power plants, which cannot regulate the amount of electricity generated according to the demand (wind, solar or even nuclear power plants). PSH plants, which consist in two reservoirs located at different heights (upper and lower), can store energy during low demand periods (pumping water from the lower to the upper reservoir) and generate electricity during the high demand peaks (falling water from the upper to the lower reservoir). Given that the two reservoirs must be located at different heights, PSH plants cannot be constructed in flat regions. Nevertheless, in these regions, an alternative could be to use abandoned underground works (open pits or deep mines) as lower reservoirs to construct Underground Pumped Storage Hydroelectricity (UPSH) plants. To select the best place to construct a plant, two considerations must be taken into account regarding the interaction between UPSH plants and groundwater: 1) the alteration of the natural conditions of aquifers and 2), the efficiency of the plant since the electricity generated depends on the hydraulic head inside the underground reservoir. Obviously, a detailed numerical model must be necessary before to select a location. However, a screening methodology to reject the most disadvantageous sites in a short period of time would be useful. Groundwater flow impacts caused by UPSH plants are analyzed numerically and the main variables involved in the groundwater evolution are identified. The most noticeable effect consists in an oscillation of the groundwater. The hydraulic head around which groundwater oscillates, the magnitude of the oscillations and the time to achieve a "dynamic steady state" depend on the boundaries, the parameters of the aquifer and the characteristics of the underground reservoir. A screening methodology is proposed to assess the main impacts caused in aquifers by UPSH plants. Finally, the efficiency

  16. Stock participation in hydroelectric projects; Hacia una participacion accionaria en los proyectos hidroelectricos

    Energy Technology Data Exchange (ETDEWEB)

    Robinson, Scott S. [Universidad Metropolitana, Iztapalapa (Mexico). Dept. de Antropologia

    1996-12-31

    This work talks about the way the hydroelectric companies deal with the moving of people for reservoir construction. It happens trough an authoritarian way without a previous communication with the people that will be moved what make them resist. The proposal of author is make people that will be affected by the hydroelectric construction participate in the benefices it will generate. It happened in the construction of hydroelectric project in Pangue, Chile, with good results

  17. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  18. Graphical analysis of French nuclear power plant production date

    Energy Technology Data Exchange (ETDEWEB)

    Jourdan, J.P. [Electricite de France (EDF), Projet Production EPR 1, 93 - Saint-Denis (France)

    2001-07-01

    The analysis of values of plant production uses here an original method of graphical analysis. This method clarifies various difficulties of analysing big experience feedback databases among which the language interpretation and distinctions between scarce events and multi-annual events. In general, the method shows the logical processes that production values obey (pure chance logic, administrative logic, and willpower) This method of graphical analysis provides a tool to observe and question in a concrete way so that each person involved can put the events in which he played a role into the general context of other plants. It is a deductible method to improve this big and complex system. (author)

  19. Environmental Externalities Related to Power Production Technologies in Denmark

    DEFF Research Database (Denmark)

    Ibsen, Liselotte Schleisner; Nielsen, Per Sieverts

    1997-01-01

    of the Danish part of the project is to implement the framework for externality evaluation, for three different power plants located in Denmark. The paper will focus on the assessment of the impacts of the whole fuel cycles for wind, natural gas and biogas. Priority areas for environmental impact assessment...... are identified, based on results of earlier studies and some identified of specific relevance for Denmark. Importance is attached to the quantification of impacts for each of the three fuel cycles and to monetisation of the externalities....

  20. Power

    OpenAIRE

    Bowles, Samuel; Gintis, Herbert

    2007-01-01

    We consider the exercise of power in competitive markets for goods, labour and credit. We offer a definition of power and show that if contracts are incomplete it may be exercised either in Pareto-improving ways or to the disadvantage of those without power. Contrasting conceptions of power including bargaining power, market power, and consumer sovereignty are considered. Because the exercise of power may alter prices and other aspects of exchanges, abstracting from power may miss essential a...

  1. Study on a hypothetical replacement of nuclear electricity by wind power in Sweden

    Science.gov (United States)

    Wagner, F.; Rachlew, E.

    2016-05-01

    The Swedish electricity supply system benefits strongly from the natural conditions which allow a high share of hydroelectricity. A complete supply is, however, not possible. Up to now, nuclear power is the other workhorse to serve the country with electricity. Thus, electricity production of Sweden is basically CO2 -free and Sweden has reached an environmental status which others in Europe plan to reach in 2050. Furthermore, there is an efficient exchange within the Nordic countries, Nordpol, which can ease possible capacity problems during dry cold years. In this study we investigate to what extent and with what consequences the base load supply of nuclear power can be replaced by intermittent wind power. Such a scenario leads unavoidably to high wind power installations. It is shown that hydroelectricity cannot completely smooth out the fluctuations of wind power and an additional back-up system using fossil fuel is necessary. From the operational dynamics, this system has to be based on gas. The back-up system cannot be replaced by a storage using surplus electricity from wind power. The surplus is too little. To overcome this, further strong extension of wind power is necessary which leads, however, to a reduction of the use of hydroelectricity if the annual consumption is kept constant. In this case one fossil-free energy form is replaced by another, however, more complex one. A mix of wind power at 22.3GW plus a gas based back-up system with 8.6GW producing together 64.8TWh would replace the present infrastructure with 9GW nuclear power producing 63.8TWh electricity. The specific CO2 -emission increases to the double in this case. Pumped storage for the exclusive supply of Sweden does not seem to be a meaningful investment.-1

  2. Power production among different sports with similar maximum strength.

    Science.gov (United States)

    Aşçi, Alper; Açikada, Caner

    2007-02-01

    The purpose of this study was to compare 1 repetition maximum (1RM) strength, maximum power (MP), linear momentum (Mp), and the loads of 1RM responsible for maximum power (MP%) and for linear momentum (Mp%) generated in explosive concentric bench press (CBP) motion among athletes from different sports. A total of 56 athletes (13 sprinters, 16 basketball players, 16 handball players, 5 volleyball players, and 6 bodybuilders) performed CBP in the loads of 40, 50, 60, 70, and 80% of 1RM with 1-minute rest intervals. MP and Mp were assessed during CBP by customized apparatus with 3 separate displacement transducers. There were no significant differences in MP, Mp, MP%, and Mp% among the athletes. The only significant positive correlation was found between overall 1RM and Mp for athletes (r = 0.37). In conclusion, long-term sport-specific training adaptations do not play a major role on speed-strength parameters in athletes with similar strength from different sports backgrounds.

  3. Productivity and Efficiency Measurement of the Danish Centralized Biogas Power Sector

    DEFF Research Database (Denmark)

    Racz, Viktor Jozsef; Vestergaard, Niels

    2016-01-01

    energy based heat and power source by 2050. Theoretically, the centralized biogas combined heat and power plants can play a determinant role in the subsequent Danish energy supply scheme, due to its feature to satisfy base load demand. The productivity and efficiency analysis of the currently operating......The widespread use of the renewable energy sources in the future's energy production is necessary, in order to avoid the predicted environmental, economic and social effects which can be derived from the overuse of fossil fuels. Denmark has announced to be fossil fuel independent with a renewable...... Danish centralizes biogas CHP power plants is crucial in order to study whether there is a most efficient power plant which can be introduced as a “best practice” innovative technology for the future's Danish biogas power plants. In this paper we use the intertemporal Malmquist total factor productivity...

  4. The effect of blockage on power production for laterally aligned wind turbines

    Science.gov (United States)

    Meyer Forsting, A. R.; Troldborg, N.

    2015-06-01

    This paper studies the change in the individual power coefficients for a laterally aligned row of wind turbines over a single, free turbine in the context of varying inflow directions via numerical simulations. All turbines were rotating in-line with the main flow direction. The problem definition is similar to that of many wind turbine testing sites and wind farms. Hence any changes in the individual turbine power production could have implications regarding power curve validation procedures.These changes are relatively small and therefore the size of the computational domain was identified to be detrimental in avoiding any domain-inflicted blockage. Increasing the misalignment of the main flow direction with the row of turbines led to significant variations in the power production across turbines. At the largest inflow angle of 45° it varied from -1.1% to 2%. As a whole, the power production increased by about 0.5%, almost independent of the inflow direction.

  5. 78 FR 39280 - Integrated System Power Rates

    Science.gov (United States)

    2013-07-01

    ... Doc No: 2013-15685] DEPARTMENT OF ENERGY Southwestern Power Administration Integrated System Power... hydroelectric generating facilities for the Corps and Southwestern's transmission system. The Revised Power... and non-Federal power and associated energy from the transmission system of Southwestern. \\2...

  6. Decentralized power generation from biogas; Production d'energie decentralisee a partir de biogaz

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    Areva Bioenergies proposes ready-to-use biogas production and valorization units that use industrial effluents (liquid effluents, spent water, solid wastes). Biogas valorization is performed through cogeneration plants with an output power of 500 kW to 10 MW. This brochure presents Areva's global offer in methanation projects (support, engineering, optimization). Areva Bioenergies counts 20 dual-purpose power plants in operation or under construction in the world which represent an installed power of 220 MW.

  7. Introducing life cycle thinking in product development – A case from Siemens Wind Power

    DEFF Research Database (Denmark)

    Bonou, Alexandra; Olsen, Stig Irving; Hauschild, Michael Zwicky

    2015-01-01

    How can use of LCA improve the environmental sustainability of wind industry products? An analysis of a case study from Siemens Wind Power identifies the knowledge offered by LCA that is relevant to each step of the product development process (PDP). The study illustrates the difference that this......How can use of LCA improve the environmental sustainability of wind industry products? An analysis of a case study from Siemens Wind Power identifies the knowledge offered by LCA that is relevant to each step of the product development process (PDP). The study illustrates the difference...

  8. Quantifying Uncertainty of Wind Power Production Through an Analog Ensemble

    Science.gov (United States)

    Shahriari, M.; Cervone, G.

    2016-12-01

    The Analog Ensemble (AnEn) method is used to generate probabilistic weather forecasts that quantify the uncertainty in power estimates at hypothetical wind farm locations. The data are from the NREL Eastern Wind Dataset that includes more than 1,300 modeled wind farms. The AnEn model uses a two-dimensional grid to estimate the probability distribution of wind speed (the predictand) given the values of predictor variables such as temperature, pressure, geopotential height, U-component and V-component of wind. The meteorological data is taken from the NCEP GFS which is available on a 0.25 degree grid resolution. The methodology first divides the data into two classes: training period and verification period. The AnEn selects a point in the verification period and searches for the best matching estimates (analogs) in the training period. The predictand value at those analogs are the ensemble prediction for the point in the verification period. The model provides a grid of wind speed values and the uncertainty (probability index) associated with each estimate. Each wind farm is associated with a probability index which quantifies the degree of difficulty to estimate wind power. Further, the uncertainty in estimation is related to other factors such as topography, land cover and wind resources. This is achieved by using a GIS system to compute the correlation between the probability index and geographical characteristics. This study has significant applications for investors in renewable energy sector especially wind farm developers. Lower level of uncertainty facilitates the process of submitting bids into day ahead and real time electricity markets. Thus, building wind farms in regions with lower levels of uncertainty will reduce the real-time operational risks and create a hedge against volatile real-time prices. Further, the links between wind estimate uncertainty and factors such as topography and wind resources, provide wind farm developers with valuable

  9. Proceedings on the seminar on small hydroelectric installations: Practice report and current development; Beitraege zum Seminar Kleinwasserkraft: Praxis und aktuelle Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    This seminar on small hydroelectric installations informs on aspects of construction and administrative aspects. But above all, questions of machinery are dealt with. The book gives an overview of turbine types, topical recent developments in the sector of small hydroelectric power stations, and modern opportunities for fast and inexpensive design of power station components. Beyond the discussion of technical issues, the seminar wants to further contacts between science, turbine manufacturers, consultants and plant operators. (orig.) [Deutsch] Das Seminar Kleinwasserkraft gibt eine Uebersicht ueber bauliche Gestaltung und behoerdliche Aspekte. Vorallem behandelt es aber maschinenbauliche Problemstellungen. Es zeigt einen Ueberblick ueber Turbinentypen, aktuelle Neuentwicklungen im Kleinwassersektor, sowie moderne Moeglichkeiten zum schnellen und preiswerten Design von Kraftwerkskomponenten. Neben dem technischen Teil dient das Seminar auch der Foerderung des Kontakts zwischen Wissenschaft, Turbinenherstellern, Consultants und Anlagenbetreibern. (orig.)

  10. Case study analysis of legal and institutional obstacles and incentives to the development of the hydroelectric potential at Goose River, Maine

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The case study is an analysis of the legal, institutional, and financial incentives and obstacles to the development of the hydroelectric potential on the Goose River in Maine. The Goose River project concerns development by a private developer, Maine Hydro-Electric Development Corporation. The project is comprised of a five-dam system, with the first dam located at Swan Lake and the fifth dam about one mile from the sea. It will utilize the 7500 acre-feet of storage capacity of Swan Lake to run the four downstream power stations. The system is designed to generate 430 kWs of total capacity which would be sold to Central Maine Power, the local investor-owned public utility.

  11. REFINED MATHEMATICAL MODEL OF HYDROELECTRIC DRIVE OF THE CRYSTALLIZER ROLLING OF HIGH-SPEED MNLZ

    Directory of Open Access Journals (Sweden)

    V. V. Bolotskij

    2004-01-01

    Full Text Available At present time the high emphasis is placed on the problems of the quality improvement and increase of the metal cast speed at the machines of the slugs continuous casting. One of the ways of solving of this task is using of hydroelectric drive of the mechanism of the crystallizer swinging, which allows to vary frequency and amplitude of swinging and also to change the principle of crystallizer. In the work there is presented the improved mathematical model of the crystallizer swinging mechanism in the form of the automatic control system, using of which one can investigate the influence of different parameters of the system on quality and productivity of the machines of the slugs continuous casting.

  12. Project PAT (Pumps Working as Turbines)/IG (Induction Generators): a new concept for generation of electric power through micro scale hydroelectric power plants; Projeto BFT (Bombas Funcionado como Turbinas)/GI (Geradores de Inducao): um novo conceito para geracao de energia eletrica atraves de microcentrais hidreletricas

    Energy Technology Data Exchange (ETDEWEB)

    Viana, Augusto Nelson Carvalho [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais. Programa de Pos-graduacao em Engenharia da Energia; Medeiros, Daniel de Macedo; Ricardo, Mateus [Universidade Federal de Itajuba (UNIFEI), Itajuba, MG (Brazil). Inst. de Recursos Naturais], Emails: augusto@unifei.edu.br, macedo@unifei.edu.br, mathidr@yahoo.com.br

    2006-07-01

    The present work has as objective to present the main bases of 'PAT/IG Project', accomplished in Boa Esperanca Farm (Delfim Moreira - MG), by an accord between Itajuba's Federal University and Mines and Energy Ministry. In a moment that the look for sustainable development is the law in Brazil, low costs and environmental impact alternatives must be prioritized. By this way, the PAT/IG Project continuous the Viana's (1987) works, that developed all Brazilian theoretical bases for using Pumps Working as Turbine (PAT). Besides that, the application of induction motors operating as induction generators will be evaluated, as the velocity control system of the PAT/IG group will be developed. The existing Boa Esperanca Farm's micro power plant will be rebuild ed, to receive a new generating group formed for a PAT and a IG, that will be used as natural sized test workbench of Itajuba's Federal University. At the ending of the project, there will be enough subsidies to prove, in practice, the feasibility presented in laboratorial tests by PAT/IG groups as conventional turbines replacer in micro powerplants. (author)

  13. The effect of blockage on power production for laterally aligned wind turbines

    DEFF Research Database (Denmark)

    Meyer Forsting, Alexander Raul; Troldborg, Niels

    2015-01-01

    This paper studies the change in the individual power coefficients for a laterally aligned row of wind turbines over a single, free turbine in the context of varying inflow directions via numerical simulations. All turbines were rotating in-line with the main flow direction. The problem definition...... to be detrimental in avoiding any domain-inflicted blockage. Increasing the misalignment of the main flow direction with the row of turbines led to significant variations in the power production across turbines. At the largest inflow angle of 45 it varied from -1.1 % to 2 %. As a whole, the power production...

  14. The hydroelectric dam impacts on the Kompienga river basin (Burkina Faso); Les impacts du barrage hydro-electrique sur le bassin versant de la komoienga (Burkina Faso)

    Energy Technology Data Exchange (ETDEWEB)

    Dipama, J.M.

    1997-07-01

    This study takes stock on the physical and social environment negative impacts of the hydroelectric dam built in 1985 in the Burkina Faso. Th electric power of the country have been improved but the hydrocarbons consumption did not decrease. The vegetation decreased in the area of the dam from 15 km{sup 2} to 7,6 and soils are now more exposed to the erosion phenomena. Biological modifications of the ecosystem appeared as human diseases. (A.L.B.)

  15. Converting local biomass to local benefits - six identical standardized biomass-fuelled power plants to combined heat and power production

    Energy Technology Data Exchange (ETDEWEB)

    Maekelae, J. (MW Power Oy, Vantaa (Finland)), e-mail: jouni.makela@mwpower.fi

    2010-07-01

    The biopower plants will ensure environmental friendliness and sustainability from fuel supply to power production. They will strengthen the regions with local energy supplies and increase the importance of regionally available raw materials. In addition to reducing local emissions, securing power supply and minimizing the need for new transmission lines, the plants benefit the local economy. In operation the six plants will spare the climate more than 150,000 tons of carbon dioxide per year. The plants will be supplied to Bayernfonds BestEnergy 1 GmbH and Co. KG in Germany by MW Power, a joint venture of the Finnish companies Metso and Waertsilae. The plants will burn wood residues from the local forests. The quality - such as impurities, water content and particle size - will be complied by an appropriate quality assurance system. All six Biopower plants have an identical configuration and set up and will have an electrical power output of 4,99 MWe each - gaining all benefits of standardization. The electricity to be generated by the plants will be fed to the main grid. The Biopower plants fulfil the very strict German laws and provisions - which are among the strictest worldwide - referring the emission deriving from cogeneration plants. At the time of submitting this manuscript, four of the power plants has started up and are in commercial operation, and two plants are under construction. The paper describes the challenges in the plant technology and fuel supply. (orig.)

  16. Annual Energy Production (AEP) optimization for tidal power plants based on Evolutionary Algorithms - Swansea Bay Tidal Power Plant AEP optimization

    Science.gov (United States)

    Kontoleontos, E.; Weissenberger, S.

    2016-11-01

    In order to be able to predict the maximum Annual Energy Production (AEP) for tidal power plants, an advanced AEP optimization procedure is required for solving the optimization problem which consists of a high number of design variables and constraints. This efficient AEP optimization procedure requires an advanced optimization tool (EASY software) and an AEP calculation tool that can simulate all different operating modes of the units (bidirectional turbine, pump and sluicing mode). The EASY optimization software is a metamodel-assisted Evolutionary Algorithm (MAEA) that can be used in both single- and multi-objective optimization problems. The AEP calculation tool, developed by ANDRITZ HYDRO, in combination with EASY is used to maximize the tidal annual energy produced by optimizing the plant operation throughout the year. For the Swansea Bay Tidal Power Plant project, the AEP optimization along with the hydraulic design optimization and the model testing was used to evaluate all different hydraulic and operating concepts and define the optimal concept that led to a significant increase of the AEP value. This new concept of a triple regulated “bi-directional bulb pump turbine” for Swansea Bay Tidal Power Plant (16 units, nominal power above 320 MW) along with its AEP optimization scheme will be presented in detail in the paper. Furthermore, the use of an online AEP optimization during operation of the power plant, that will provide the optimal operating points to the control system, will be also presented.

  17. Conjunction of Photovoltaic and Thermophotovoltaic Power Production in Spacecraft Power Systems

    Science.gov (United States)

    2015-09-01

    more accurate model of the Earth’s core, revealed that decay of uranium-238 and thorium-232 may contribute to almost half of the Earth’s geothermal ...heat flux (approximately 20.0 of 44.2 TW). Though this obviously contributes to our use of geothermal energy for heat and electricity production, more

  18. Placement of Combined Heat, Power and Hydrogen Production Fuel Cell Power Plants in a Distribution Network

    Directory of Open Access Journals (Sweden)

    Bahman Bahmanifirouzi

    2012-03-01

    Full Text Available This paper presents a new Fuzzy Adaptive Modified Particle Swarm Optimization algorithm (FAMPSO for the placement of Fuel Cell Power Plants (FCPPs in distribution systems. FCPPs, as Distributed Generation (DG units, can be considered as Combined sources of Heat, Power, and Hydrogen (CHPH. CHPH operation of FCPPs can improve overall system efficiency, as well as produce hydrogen which can be stored for the future use of FCPPs or can be sold for profit. The objective functions investigated are minimizing the operating costs of electrical energy generation of distribution substations and FCPPs, minimizing the voltage deviation and minimizing the total emission. In this regard, this paper just considers the placement of CHPH FCPPs while investment cost of devices is not considered. Considering the fact that the objectives are different, non-commensurable and nonlinear, it is difficult to solve the problem using conventional approaches that may optimize a single objective. Moreover, the placement of FCPPs in distribution systems is a mixed integer problem. Therefore, this paper uses the FAMPSO algorithm to overcome these problems. For solving the proposed multi-objective problem, this paper utilizes the Pareto Optimality idea to obtain a set of solution in the multi-objective problem instead of only one. Also, a fuzzy system is used to tune parameters of FAMPSO algorithm such as inertia weight. The efficacy of the proposed approach is validated on a 69-bus distribution system.

  19. UPVapor: Cofrentes nuclear power plant production results analysis software

    Energy Technology Data Exchange (ETDEWEB)

    Curiel, M. [Logistica y Acondicionamientos Industriales SAU, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain); Palomo, M. J. [ISIRYM, Universidad Politecnica de Valencia, Camino de Vera s/n, Valencia (Spain); Baraza, A. [Iberdrola Generacion S. A., Central Nuclear Cofrentes, Carretera Almansa Requena s/n, 04662 Cofrentes, Valencia (Spain); Vaquer, J., E-mail: m.curiel@lainsa.co [TITANIA Servicios Tecnologicos SL, Sorolla Center, local 10, Av. de las Cortes Valencianas No. 58, 46015 Valencia (Spain)

    2010-10-15

    UPVapor software version 02 has been developed for the Cofrentes nuclear power plant Data Analysis Department (Spain). It is an analysis graphical environment in which users have available all the plant variables registered in the process computer system (SIEC). In order to perform this, UPVapor software has many advanced graphic tools for work simplicity, as well as a friendly environment easy to use and with many configuration possibilities. Plant variables are classified in the same way that they are in SIEC computer and these values are taken from it through the network of Iberdrola. UPVapor can generate two different types of graphics: evolution graphs and X Y graphs. The first ones analyse the evolution up to twenty plant variables in a user's defined time period and according to historic plant files. Many tools are available: cursors, graphic configuration, mobile means, non valid data visualization ... Moreover, a particular analysis configuration can be saved, as a pre selection, giving the possibility of charging pre selection directly and developing quick monitoring of a group of preselected plant variables. In X Y graphs, it is possible to analyse a variable value against another variable in a defined time. As an option, users can filter previous data depending on a variable certain range, with the possibility of programming up to five filters. As well as the other graph, X Y graph has many configurations, saving and printing options. With UPVapor software, data analysts can save a valuable time during daily work and, as it is of easy utilization, it permits to other users to perform their own analysis without ask the analysts to develop. Besides, it can be used from any work centre with access to network framework. (Author)

  20. Wind-Friendly Flexible Ramping Product Design in Multi-Timescale Power System Operations

    Energy Technology Data Exchange (ETDEWEB)

    Cui, Mingjian; Zhang, Jie; Wu, Hongyu; Hodge, Bri-Mathias

    2017-07-01

    With increasing wind power penetration in the electricity grid, system operators are recognizing the need for additional flexibility, and some are implementing new ramping products as a type of ancillary service. However, wind is generally thought of as causing the need for ramping services, not as being a potential source for the service. In this paper, a multi-timescale unit commitment and economic dispatch model is developed to consider the wind power ramping product (WPRP). An optimized swinging door algorithm with dynamic programming is applied to identify and forecast wind power ramps (WPRs). Designed as positive characteristics of WPRs, the WPRP is then integrated into the multi-timescale dispatch model that considers new objective functions, ramping capacity limits, active power limits, and flexible ramping requirements. Numerical simulations on the modified IEEE 118-bus system show the potential effectiveness of WPRP in increasing the economic efficiency of power system operations with high levels of wind power penetration. It is found that WPRP not only reduces the production cost by using less ramping reserves scheduled by conventional generators, but also possibly enhances the reliability of power system operations. Moreover, wind power forecasts play an important role in providing high-quality WPRP service.

  1. Economic perspectives of Power-to-Gas technologies in bio-methane production

    NARCIS (Netherlands)

    Sarić, Marija; Dijkstra, Jan Wilco; Haije, W.G.

    2017-01-01

    A study on integration of Power-to-Gas technology with bio-methane production from bio-syngas produced by biomass gasification shows that a significant amount of excess electricity can be accommodated in bio-SNG production. By adding hydrogen produced from intermittent renewable sources to a

  2. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy...), on the Eagle Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies...

  3. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-11-20

    ..., 2011,\\1\\ has been transferred to Troy Mills Hydroelectric Inc. The project is located on the Missisquoi River in Orleans County, Vermont. The transfer of an exemption does not require Commission approval. \\1... Energy Regulatory Commission Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer...

  4. 77 FR 12835 - American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2012-03-02

    ... 22, 1982,\\1\\ has been transferred to Burnshire Hydroelectric, LLC. The project is located on the North Fork, Shenandoah River in Shenandoah County, Virginia. The transfer of an exemption does not... Energy Regulatory Commission American Land Company, LLC, Burnshire Hydroelectric, LLC; Notice of Transfer...

  5. Status Review of Wildlife Mitigation at Columbia Basin Hydroelectric Projects, Oregon Facilities, Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Bedrossian, Karen L.

    1984-08-01

    The report presents a review and documentation of existing information on wildlife resources at Columbia River Basin hydroelectric facilities within Oregon. Effects of hydroelectric development and operation; existing agreements; and past, current and proposed wildlife mitigation, enhancement, and protection activities were considered. (ACR)

  6. 76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-08-17

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption 1. Pursuant to section 4.106(i) of the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric...

  7. The effect of microwave power on the production of biodiesel from nyamplung

    Science.gov (United States)

    Qadariyah, L.; Mujaddid, F.; Raka; Dhonny, S. B.; Mahfud, M.

    2017-12-01

    Today, energy needs in Indonesia still rely on fossil energy sources that its availability in the world is increasingly depleted. Therefore, the research for alternative energy of petroleum must be developed, one of them is biodiesel. The use of microwave as energy source of biodiesel production can speed up the reaction time. So the microwave is considered more efficient. Seeds of nyamplung has an oil content of 71.4% (w/w) by weight. With the oil content of the nyamplung seeds has great potential when used as a raw material for biodiesel production. The aim of this research to study the effect of microwave power on the production of biodisel from nyamplung oil. Microwave power affects density, viscosity and yield of the product. The used of alkali catalyst, with higher the power, the lower the density and viscosity of the resulting product, but the resulting yield is 300 W. The power of more than 300 W is the opposite, resulting in the production of biodiesel using the optimum base catalyst at 300 W power.

  8. Applications of magnetic power production and its assessment - Annual report 2007

    Energy Technology Data Exchange (ETDEWEB)

    Kitanovski, A.; Vuarnoz, D.; Diebold, M.; Gonin, C.; Egolf, P. W.

    2007-07-01

    This annual report for the Swiss Federal Office of Energy (SFOE) takes a look at the work done at the University of Applied Sciences of Western Switzerland in 2007 on a project involving power production based on magnetic effects. In this annual report, a selection of feasible and economic magnetic power conversion systems is listed. Magnetic 'power generators' based on permanent and superconducting magnets are analysed for several heat source temperatures, magnetic field strengths and machine rotational frequencies. The analysis uses a newly derived model, which permits the determination of thermodynamic efficiency and exergy efficiency of a magnetic power-conversion system. This study shows that magnetic power conversion is better than conventional technologies in many aspects, such as, for example, for low exergy heat sources, where most of the conventional energy conversion technologies cannot even operate. The authors state that, in contrast, magnetic power generation technology leads to a high exergy efficiency of energy conversion for such sources.

  9. Decentralized production: the reactive power problem; Producao descentralizada: o problema da potencia reactiva

    Energy Technology Data Exchange (ETDEWEB)

    Castro, Rui M.G.; Paiva, J.P. Sucena [Universidade Tecnica de Lisboa (Portugal). Inst. Superior Tecnico. E-mail: rcastro@hertz.ist.utl.pt

    1999-07-01

    In accordance with the present regulation, the independent producer of electric power from renewable energy sources, connected to the public network, must supply reactive power equivalent to 40% of the active power produced (at the peak and full consumption). In order to study the consequences of this technical regulation, a high voltage network with contribution from mini hydropower production was analyzed. Initially, a network was studied in its reference configuration and afterwards, in the exploration mode, where the power plants proceed to a local compensation of the power factor. From the obtained results, the main conclusion is that the regulation under discussion is not technically supported, since that a a correct voltage profile is not maintained at the plant influence zone. On the other hand, considering that the reactive power is value with local influence, some benefit for the public network can not be assured.

  10. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    DEFF Research Database (Denmark)

    Lythcke-Jørgensen, Christoffer Ernst; Haglind, Fredrik; Clausen, Lasse Røngaard

    2013-01-01

    of an integrated system in which steam extracted from an existing combined heat and power unit is used for covering the heating demand of a lignocellulosic ethanol production facility. The integration solution was designed and optimized using already existing steam extraction points in the combined heat and power...... produces ethanol, solid biofuel, molasses, and is able to produce district heating hot water. Considering all products equally valuable, the exergy efficiency of the ethanol facility was found to be 0.790 during integrated operation with zero district heating production, and 0.852 during integrated......Integrating second generation bioethanol production in combined heat and power units is expected to increase system energy efficiencies while producing sustainable fuel for the transportation sector at a competitive price. By applying exergy analysis, this study assessed the efficiency...

  11. US Power Production at Risk from Water Stress in a Changing Climate.

    Science.gov (United States)

    Ganguli, Poulomi; Kumar, Devashish; Ganguly, Auroop R

    2017-09-20

    Thermoelectric power production in the United States primarily relies on wet-cooled plants, which in turn require water below prescribed design temperatures, both for cooling and operational efficiency. Thus, power production in US remains particularly vulnerable to water scarcity and rising stream temperatures under climate change and variability. Previous studies on the climate-water-energy nexus have primarily focused on mid- to end-century horizons and have not considered the full range of uncertainty in climate projections. Technology managers and energy policy makers are increasingly interested in the decadal time scales to understand adaptation challenges and investment strategies. Here we develop a new approach that relies on a novel multivariate water stress index, which considers the joint probability of warmer and scarcer water, and computes uncertainties arising from climate model imperfections and intrinsic variability. Our assessments over contiguous US suggest consistent increase in water stress for power production with about 27% of the production severely impacted by 2030s.

  12. Hydrologic Forecasting and Hydropower Production

    Science.gov (United States)

    Wigmosta, M. S.; Voisin, N.; Lettenmaier, D. P.; Coleman, A.; Mishra, V.; Schaner, N. A.

    2011-12-01

    Hydroelectric power production is one of many competing demands for available water along with other priority uses such as irrigation, thermoelectric cooling, municipal, recreation, and environmental performance. Increasingly, hydroelectric generation is being used to offset the intermittent nature of some renewable energy sources such as wind-generated power. An accurate forecast of the magnitude and timing of water supply assists managers in integrated planning and operations to balance competing water uses against current and future supply while protecting against the possibility of water or energy shortages and excesses with real-time actions. We present a medium-range to seasonal ensemble streamflow forecasting system where uncertainty in forecasts is addressed explicitly. The integrated forecast system makes use of remotely-sensed data and automated spatial and temporal data assimilation. Remotely-sensed snow cover, observed snow water equivalent, and observed streamflow data are used to update the hydrologic model state prior to the forecast. In forecast mode, the hydrology model is forced by calibrated ensemble weather/climate forecasts. This system will be fully integrated into a water optimization toolset to inform reservoir and power operations, and guide environmental performance decision making. This flow forecast system development is carried out in agreement with the National Weather Service so that the system can later be incorporated into the NOAA eXperimental Ensemble Forecast Service (XEFS).

  13. STUDY OF PLANT-WIDE CONTROL IMPLEMENTATION IN PRODUCTION PROCESS OF GEOTHERMAL POWER PLANT

    OpenAIRE

    KATHERIN INDRIAWATI; GUNAWAN NUGROHO; BAMBANG L. WIDJIANTORO; Totok R. Biyanto

    2017-01-01

    The design of plant-wide control system to optimize electricity production in geothermal power plant is proposed in this research. The objective is to overcome the deficiency due to changes in the characteristics of production well and fluctuation in electricity demand load. The proposed plant-wide control system has two main tasks; to maintain production process at optimum value and to increase efficiency. The pressure in separator and condenser is maintained at the respective set points und...

  14. Operating experience from Swedish nuclear power plants 2002

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The total production of electricity from Swedish nuclear power plants was 65.6 TWh during 2002, which is a decrease compared to 2001. The energy capability factor for the 11 Swedish reactors averaged 80.8%. The PWRs at Ringhals averaged 87.6%, while the BWRs, not counting Oskarshamn 1, reached 89.2%. No events, which in accordance to conventions should be reported to IAEA, have occurred during 2002. Operational statistics are presented for each Swedish reactor. The hydroelectric power was 66 TWh, 16% lower than 2000. Wind power contributed 0.5 TWh, and remaining production sources, mainly from solid fuel plants combined with district heating, contributed 10.9 TWh. The electricity generation totalled 143 TWh, considerably less than the record high 2001 figure of 158.7 TWh. The preliminary figures for export were 14.8 TWh and and for import 20.1 TWh.

  15. Impact of Production from Photovoltaic Power Plants on Increase of Ancillary Services in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Martin Smocek

    2016-01-01

    Full Text Available Renewable energy resources represent a noticeable part of the overall energetic concept development. New integration of renewable energy resources into power grids has a significant impact on the reliability and quality of power supply. The major problem of the photovoltaic and wind power plants is their dependency on weather conditions, since it has a direct effect on their immediate output produced that shows stochastic behaviour. These stochastic outputs result in very adverse impacts on the power grid. Further development of these resources could lead to exceeding of the control and absorption abilities of the power grid. The power grid must be set in balance with respect to the production and consumption of electric power at any time. The operation of photovoltaic power plants impair keeping this balance. That has an adverse impact on the very operation and maintenance of network parameters within the extent required. This survey deals with analysis focused on operation of the photovoltaic power plants with respect to the increase of reserve power in ancillary services in the Czech Republic.

  16. Altering Anode Thickness To Improve Power Production in Microbial Fuel Cells with Different Electrode Distances

    KAUST Repository

    Ahn, Yongtae

    2013-01-17

    A better understanding of how anode and separator physical properties affect power production is needed to improve energy and power production by microbial fuel cells (MFCs). Oxygen crossover from the cathode can limit power production by bacteria on the anode when using closely spaced electrodes [separator electrode assembly (SEA)]. Thick graphite fiber brush anodes, as opposed to thin carbon cloth, and separators have previously been examined as methods to reduce the impact of oxygen crossover on power generation. We examined here whether the thickness of the anode could be an important factor in reducing the effect of oxygen crossover on power production, because bacteria deep in the electrode could better maintain anaerobic conditions. Carbon felt anodes with three different thicknesses were examined to see the effects of thicker anodes in two configurations: widely spaced electrodes and SEA. Power increased with anode thickness, with maximum power densities (604 mW/m 2, 0.32 cm; 764 mW/m2, 0.64 cm; and 1048 mW/m2, 1.27 cm), when widely spaced electrodes (4 cm) were used, where oxygen crossover does not affect power generation. Performance improved slightly using thicker anodes in the SEA configuration, but power was lower (maximum of 689 mW/m2) than with widely spaced electrodes, despite a reduction in ohmic resistance to 10 Ω (SEA) from 51-62 Ω (widely spaced electrodes). These results show that thicker anodes can work better than thinner anodes but only when the anodes are not adversely affected by proximity to the cathode. This suggests that reducing oxygen crossover and improving SEA MFC performance will require better separators. © 2012 American Chemical Society.

  17. PLAN 2003. Costs for management of the radioactive waste products from nuclear power production

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-06-01

    The companies that own nuclear power plants in Sweden are responsible for adopting measures needed to manage and dispose of spent nuclear fuel and radioactive waste from the Swedish nuclear power reactors in a safe manner. The so-called Financing Act (1992:1537) is linked to this responsibility and prescribes that a reactor owner, in consultation with other reactor owners, shall calculate the cost for management and disposal of the spent fuel and radioactive waste and for decommissioning and dismantling of the reactor plant. The reactor owner shall annually submit to the regulatory authority the cost data that are required for calculation of the fees to be imposed on electricity production during the ensuing year and of the guarantees that must be given as security for costs not covered by paid-in fees. The reactor owners have jointly commissioned SKB to calculate and compile these costs. This report presents a calculation of the costs for implementing all of these measures. The cost calculations are based on the plan for management and disposal of the radioactive waste that has been prepared by SKB and is described in this report. The following facilities and systems are in operation: Transportation system for radioactive waste products; Central interim storage facility for spent nuclear fuel, CLAB; Final repository for radioactive operational waste, SFR 1. Plans also exist for: Canister factory and encapsulation plant for spent nuclear fuel; Deep repository for spent nuclear fuel; Final repository for long-lived low- and intermediate-level waste; Final repository for decommissioning waste. The cost calculations also include costs for research, development and demonstration, as well as for decommissioning and dismantling the reactor plants. This report is based on the proposed strategy for the activities which is presented in SKB's RD and D-Programme 2001 and in the supplementary account to RD and D-Programme 98 which SKB submitted to the regulatory authority

  18. Village power in Thailand

    Energy Technology Data Exchange (ETDEWEB)

    Bergey, M.

    1997-12-01

    This paper presents an overview of the electric power system in Thailand. 99% of the country is electrified, but much of this is with diesel generators which leaves high costs but a high level of service. The paper discusses renewable energy projects which have been sited in the country, and examples of hybrid systems which have been retrofit into existing diesel generator systems. Photovoltaic and hydroelectric power projects are described. Dedicated systems have been installed for water pumping and battery charging applications.

  19. Apparatus for nuclear transmutation and power production using an intense accelerator-generated thermal neutron flux

    Science.gov (United States)

    Bowman, C.D.

    1992-11-03

    Apparatus for nuclear transmutation and power production using an intense accelerator-generated thermal neutron flux. High thermal neutron fluxes generated from the action of a high power proton accelerator on a spallation target allows the efficient burn-up of higher actinide nuclear waste by a two-step process. Additionally, rapid burn-up of fission product waste for nuclides having small thermal neutron cross sections, and the practicality of small material inventories while achieving significant throughput derive from employment of such high fluxes. Several nuclear technology problems are addressed including 1. nuclear energy production without a waste stream requiring storage on a geological timescale, 2. the burn-up of defense and commercial nuclear waste, and 3. the production of defense nuclear material. The apparatus includes an accelerator, a target for neutron production surrounded by a blanket region for transmutation, a turbine for electric power production, and a chemical processing facility. In all applications, the accelerator power may be generated internally from fission and the waste produced thereby is transmuted internally so that waste management might not be required beyond the human lifespan.

  20. Power and the Production of Science. Assessing Cod Stocks as the Mechanistic Fishery Collapses

    OpenAIRE

    Sinclair, Peter R.; Johnsen, Jahn Petter; Ripley, Paul

    2009-01-01

    This paper discusses power relations in the production of knowledge claims and the validation of management strategies. The experience of doing stock assessment science and creating management plans for Canada’s east coast cod fishery illustrates this general process. We demonstrate that the cyborgization of fisheries-management is limited by its inability to produce power for stabilizing the relations between managers, fishers, technology and fish. Lack of stability forces ...

  1. Minimal RED cell pairs markedly improve electrode kinetics and power production in microbial reverse electrodialysis cells.

    Science.gov (United States)

    Cusick, Roland D; Hatzell, Marta; Zhang, Fang; Logan, Bruce E

    2013-12-17

    Power production from microbial reverse electrodialysis cell (MRC) electrodes is substantially improved compared to microbial fuel cells (MFCs) by using ammonium bicarbonate (AmB) solutions in multiple RED cell pair stacks and the cathode chamber. Reducing the number of RED membranes pairs while maintaining enhanced electrode performance could help to reduce capital costs. We show here that using only a single RED cell pair (CP), created by operating the cathode in concentrated AmB, dramatically increased power production normalized to cathode area from both acetate (Acetate: from 0.9 to 3.1 W/m(2)-cat) and wastewater (WW: 0.3 to 1.7 W/m(2)), by reducing solution and charge transfer resistances at the cathode. A second RED cell pair increased RED stack potential and reduced anode charge transfer resistance, further increasing power production (Acetate: 4.2 W/m(2); WW: 1.9 W/m(2)). By maintaining near optimal electrode power production with fewer membranes, power densities normalized to total membrane area for the 1-CP (Acetate: 3.1 W/m(2)-mem; WW: 1.7 W/m(2)) and 2-CP (Acetate: 1.3 W/m(2)-mem; WW: 0.6 W/m(2)) reactors were much higher than previous MRCs (0.3-0.5 W/m(2)-mem with acetate). While operating at peak power, the rate of wastewater COD removal, normalized to reactor volume, was 30-50 times higher in 1-CP and 2-CP MRCs than that in a single chamber MFC. These findings show that even a single cell pair AmB RED stack can significantly enhance electrical power production and wastewater treatment.

  2. Minimal RED Cell Pairs Markedly Improve Electrode Kinetics and Power Production in Microbial Reverse Electrodialysis Cells

    KAUST Repository

    Cusick, Roland D.

    2013-12-17

    Power production from microbial reverse electrodialysis cell (MRC) electrodes is substantially improved compared to microbial fuel cells (MFCs) by using ammonium bicarbonate (AmB) solutions in multiple RED cell pair stacks and the cathode chamber. Reducing the number of RED membranes pairs while maintaining enhanced electrode performance could help to reduce capital costs. We show here that using only a single RED cell pair (CP), created by operating the cathode in concentrated AmB, dramatically increased power production normalized to cathode area from both acetate (Acetate: from 0.9 to 3.1 W/m 2-cat) and wastewater (WW: 0.3 to 1.7 W/m2), by reducing solution and charge transfer resistances at the cathode. A second RED cell pair increased RED stack potential and reduced anode charge transfer resistance, further increasing power production (Acetate: 4.2 W/m2; WW: 1.9 W/m2). By maintaining near optimal electrode power production with fewer membranes, power densities normalized to total membrane area for the 1-CP (Acetate: 3.1 W/m2-mem; WW: 1.7 W/m2) and 2-CP (Acetate: 1.3 W/m2-mem; WW: 0.6 W/m2) reactors were much higher than previous MRCs (0.3-0.5 W/m2-mem with acetate). While operating at peak power, the rate of wastewater COD removal, normalized to reactor volume, was 30-50 times higher in 1-CP and 2-CP MRCs than that in a single chamber MFC. These findings show that even a single cell pair AmB RED stack can significantly enhance electrical power production and wastewater treatment. © 2013 American Chemical Society.

  3. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    Energy Technology Data Exchange (ETDEWEB)

    Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over several years, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana.

  4. Biodigester economic viability for electrical power production using biogas from swine waste

    Energy Technology Data Exchange (ETDEWEB)

    Cervi, Ricardo Ghantous; Esperancini, Maura Seiko Tsutsui; Bueno, Osmar de Carvalho [Universidade Estadual Paulista (FCA/UNESP), Botucatu, SP (Brazil). Fac. de Ciencias Agronomicas], E-mail: ricardogc@fca.unesp.br; Souza, Samuel Nelson Melegari de [Universidade Estadual do Oeste do Parana (CCET/UNIOESTE), Cascavel, PR (Brazil). Centro de Ciencias Exatas e Tecnologicas

    2008-07-01

    The increase of energy use in agriculture and the raising prices of electricity demand studies on alternate sources of energy and improvement on biogas use efficiency so that agricultural activities become more competitive. Biogas production through anaerobic biodigestion represents an important breakthrough for the problem of swine waste and energy availability for rural areas. This work aimed to analyze the economy on biodigester investment for electrical power production using biogas from anaerobic biodigestion of swine waste. Two factors were used for this evaluation: the cost of electrical power production through biogas and time for equipment investment return. Results show that investment return time can be only 2.45 years for electrical power at peak time. (author)

  5. Determining favourable and unfavourable areas of operation for small-scale hydroelectric plant; Ermittlung von Gunst- und Ungunstbereichen fuer die Kleinwasserkraftnutzung

    Energy Technology Data Exchange (ETDEWEB)

    Volkmann, J. [GHG, Gesellschaft fuer Hydrologie und Geowissenschaften GbR, Buchenbach (Germany)

    1998-10-01

    Decision-makers considering small-scale hydroelectric power plant face a conflict between promoting renewable forms of energy which contribute to the reduction of carbon dioxide emissions on the one hand and conserving aquatic ecosystems on the other. The approach presented here overlays and splits linear and spatial criteria to identify `taboo` or unfavourable areas, restricted areas and areas favourable for small hydroelectric plant. This can be used to reach a consensus between various interest groups. (orig.) [Deutsch] Der Zielkonflikt zwischen Foerderung regenerativer Energien als Beitrag zur CO{sub 2}-Reduzierung einerseits und wirksamem Fliessgewaesserschutz andererseits erfordert grossraeumige Rahmenkonzepte als Basis fuer Einzelentscheidungen fuer oder gegen Kleinwasserkraftnutzung. Der hier vorgestellte Ansatz ermoeglicht mittels Ueberlagerung linearer und flaechenhafter Kriterien die Ermittlung von Gunst- und Ungunstbereichen fuer die Wasserkraft. Auf diese Weise koennen im Konsens mit den beteiligten Interessengruppen sowohl Wasserkraft als auch Gewaesserschutz gezielt gefoerdert werden. (orig.)

  6. Water Stress on U.S. Power Production at Decadal Time Horizons

    Science.gov (United States)

    Ganguli, P.; Kumar, D.; Yun, J.; Short, G.; Klausner, J.; Ganguly, A. R.

    2014-12-01

    Thermoelectric power production at risk, owing to current and projected water scarcity and rising stream temperatures, is assessed for the continental United States (US) at decadal scales. Regional water scarcity is driven by climate variability and change, as well as by multi-sector water demand. While a planning horizon of zero to about thirty years is occasionally prescribed by stakeholders, the challenges to risk assessment at these scales include the difficulty in delineating decadal climate trends from intrinsic natural or multiple model variability. Current generation global climate or earth system models are not credible at the spatial resolutions of power plants, especially for surface water quantity and stream temperatures, which further exacerbates the assessment challenge. Population changes, which are anyway difficult to project, cannot serve as adequate proxies for changes in the water demand across sectors. The hypothesis that robust assessments of power production at risks are possible, despite the uncertainties, has been examined as a proof of concept. An approach is presented for delineating water scarcity and temperature from climate models, observations and population storylines, as well as for assessing power production at risk by examining geospatial correlations of power plant locations within regions where the usable water supply for energy production happens to be scarcer and warmer. Acknowledgment: Funding provided by US DOE's ARPA-E through Award DE-AR0000374.

  7. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  8. Mapping Wind Farm Loads and Power Production - A Case Study on Horns Rev 1

    DEFF Research Database (Denmark)

    Galinos, Christos; Dimitrov, Nikolay Krasimirov; Larsen, Torben J.

    2016-01-01

    , the ones facing a free sector towards west and south. The power production results of few turbines are compared with SCADA data. The results of this paper are expected to have significance for operation and maintenance planning, where the schedules for inspection and service activities can be adjusted...... above rated wind speed and the highest loaded blades are in the easternmost row as the dominating wind direction is from West. Regarding the tower components, the highest loaded WTs are also located towards the eastern central location. The turbines with highest power production are, not surprisingly...

  9. The regional control of the canadian energy production; Le contraste provincial de la production energetique canadienne

    Energy Technology Data Exchange (ETDEWEB)

    Petitlaurent, S.; Sarrazin, J

    2004-12-01

    This document provides information and presents data on the energy situation in many regions of Canada. The first part deals with the petroleum and the bitumen shales of Alberta (reserves, exploitation and production, environmental impacts), the second part discusses with the hydroelectricity choice of Quebec and the 2004 crisis. The nuclear situation of Ontario is presented in the third part (nuclear park, programs, uranium reserves, research and development on Candu reactors), while the fourth part deals with the renewable energies (wind power and biomass). The canadian situation facing the Kyoto protocol is discussed in the last part. (A.L.B.)

  10. Inventory of future power and heat production technologies. Partial report Wind Power; Inventering av framtidens el- och vaermeproduktionstekniker. Delrapport Vindkraft

    Energy Technology Data Exchange (ETDEWEB)

    Clausen, Niels-Erik; Lawaetz, Henrik; Lemming, Joergen; Morthorst, Poul Erik (Risoe National Laboratory, Roskilde (Denmark))

    2008-12-15

    The development of the wind energy technology has been very successful from the 1970s and up till now. Initially there was a battle between wind turbine concepts, but the commercial winner today is the three-bladed horizontal axis, upwind, electricity producing and grid connected wind turbine with availability on mature markets somewhere around 99%. An important contributor to the growth of the European market for wind energy technology has been EU framework legislation combined with legislation at the national level. The binding target for renewable energy in Sweden is proposed to be 49% of the final energy consumption in 2020 compared to 39.8% in 2005. To stimulate the development of wind energy and to promote a specific national goals Sweden is mainly using an electricity certificate system. The target is to increase the production of electricity from renewable sources by 17 TWh in 2016, relative to corresponding production in 2002. There is not at specific target for the use of wind energy. A future energy system that includes a high proportion of wind energy will be expected to meet the same requirements for security of supply and economic efficiency as the energy systems of today. The variability of wind power create a specific challenges for the future energy systems compared to those of today. The economics of wind power depends mainly of investment cost, operation and maintenance costs, electricity production and turbine lifetime. An average turbine installed in Europe has a total investment cost of 1.230 Euro/kW with a typically variation from approximately 1000 Euro/kW to approximately 1400 Euro/kW. The calculated costs per kWh wind generated power range from approximately 0.07-0.10 Euro/kWh at sites with low average wind speeds to approximately 0.05-0.065 Euro/kWh at good coastal positions, with an average of approximately 0.07 Euro/kWh at a medium wind site. Offshore costs are largely dependent on weather and wave conditions, water depth, and distance

  11. Subsurface Hybrid Power Options for Oil & Gas Production at Deep Ocean Sites

    Energy Technology Data Exchange (ETDEWEB)

    Farmer, J C; Haut, R; Jahn, G; Goldman, J; Colvin, J; Karpinski, A; Dobley, A; Halfinger, J; Nagley, S; Wolf, K; Shapiro, A; Doucette, P; Hansen, P; Oke, A; Compton, D; Cobb, M; Kopps, R; Chitwood, J; Spence, W; Remacle, P; Noel, C; Vicic, J; Dee, R

    2010-02-19

    An investment in deep-sea (deep-ocean) hybrid power systems may enable certain off-shore oil and gas exploration and production. Advanced deep-ocean drilling and production operations, locally powered, may provide commercial access to oil and gas reserves otherwise inaccessible. Further, subsea generation of electrical power has the potential of featuring a low carbon output resulting in improved environmental conditions. Such technology therefore, enhances the energy security of the United States in a green and environmentally friendly manner. The objective of this study is to evaluate alternatives and recommend equipment to develop into hybrid energy conversion and storage systems for deep ocean operations. Such power systems will be located on the ocean floor and will be used to power offshore oil and gas exploration and production operations. Such power systems will be located on the oceans floor, and will be used to supply oil and gas exploration activities, as well as drilling operations required to harvest petroleum reserves. The following conceptual hybrid systems have been identified as candidates for powering sub-surface oil and gas production operations: (1) PWR = Pressurized-Water Nuclear Reactor + Lead-Acid Battery; (2) FC1 = Line for Surface O{sub 2} + Well Head Gas + Reformer + PEMFC + Lead-Acid & Li-Ion Batteries; (3) FC2 = Stored O2 + Well Head Gas + Reformer + Fuel Cell + Lead-Acid & Li-Ion Batteries; (4) SV1 = Submersible Vehicle + Stored O{sub 2} + Fuel Cell + Lead-Acid & Li-Ion Batteries; (5) SV2 = Submersible Vehicle + Stored O{sub 2} + Engine or Turbine + Lead-Acid & Li-Ion Batteries; (6) SV3 = Submersible Vehicle + Charge at Docking Station + ZEBRA & Li-Ion Batteries; (7) PWR TEG = PWR + Thermoelectric Generator + Lead-Acid Battery; (8) WELL TEG = Thermoelectric Generator + Well Head Waste Heat + Lead-Acid Battery; (9) GRID = Ocean Floor Electrical Grid + Lead-Acid Battery; and (10) DOC = Deep Ocean Current + Lead-Acid Battery.

  12. STUDY OF PLANT-WIDE CONTROL IMPLEMENTATION IN PRODUCTION PROCESS OF GEOTHERMAL POWER PLANT

    Directory of Open Access Journals (Sweden)

    KATHERIN INDRIAWATI

    2017-02-01

    Full Text Available The design of plant-wide control system to optimize electricity production in geothermal power plant is proposed in this research. The objective is to overcome the deficiency due to changes in the characteristics of production well and fluctuation in electricity demand load. The proposed plant-wide control system has two main tasks; to maintain production process at optimum value and to increase efficiency. The pressure in separator and condenser is maintained at the respective set points under electrical load fluctuations in order to ensure optimum efficiency. The control system also reduce the usage of auxialiary electrical power and increase efficiency. The task was performed by controlling inlet cooling water temperatures to the condenser. It was concluded that the proposed control structure was able to increase efficiency and maintain production.

  13. System-Level Value of a Gas Engine Power Plant in Electricity and Reserve Production

    Directory of Open Access Journals (Sweden)

    Antti Alahäivälä

    2017-07-01

    Full Text Available Power systems require a certain amount of flexibility to meet varying demand and to be able to cope with unexpected events, and this requirement is expected to increase with the emergence of variable power generation. In this paper, we focus on gas engine power plant technology and the beneficial influence its flexible operation can have on a power system. The study introduces the concept of a combined-cycle gas engine power plant (CCGE, which comprises a combination of several gas-fired combustion engines and a steam turbine. The operation of CCGE is then comprehensively analyzed in electricity and reserve production in the South African power system and compared with combined-cycle gas turbine (CCGT technology. Even though CCGE is a form of technology that has already been commercialized, it is rarely considered as a source of flexibility in the academic research. That is the notion providing the motivation for this study. Our core contribution is to show that the flexibility of CCGE can be valuable in power systems. The methodology is based on the unit-level model of the studied system and the solving of a day-ahead unit commitment problem for each day of the simulated 11-year period. The simulation studies reveal how a CCGE is able to offer system flexibility to follow hourly load variations and capacity to provide reserve power effectively.

  14. Power

    DEFF Research Database (Denmark)

    Elmholdt, Claus Westergård; Fogsgaard, Morten

    2016-01-01

    In this chapter, we will explore the dynamics of power in processes of creativity, and show its paradoxical nature as both a bridge and a barrier to creativity in organisations. Recent social psychological experimental research (Slighte, de Dreu & Nijstad, 2011) on the relation between power...... and creativity suggests that when managers give people the opportunity to gain power and explicate that there is reason to be more creative, people will show a boost in creative behaviour. Moreover, this process works best in unstable power hierarchies, which implies that power is treated as a negotiable...... and floating source for empowering people in the organisation. We will explore and discuss here the potentials, challenges and pitfalls of power in relation to creativity in the life of organisations today. The aim is to demonstrate that power struggles may be utilised as constructive sources of creativity...

  15. Reliability of offshore wind power production under extreme wind conditions. Deliverable D 9.5. Work Package 9: Electrical grid

    DEFF Research Database (Denmark)

    Cutululis, Nicolaos Antonio; Zeni, Lorenzo

    . The aspects investigated are storm events occurrences and durations, storm control strategy impact on the capacity factor (lost production), the loss of production (power produced from wind drops below a certain threshold due to high wind speeds and storm controller) and finally, the wind power production...

  16. Improving Power System Modeling. A Tool to Link Capacity Expansion and Production Cost Models

    Energy Technology Data Exchange (ETDEWEB)

    Diakov, Victor [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cole, Wesley [National Renewable Energy Lab. (NREL), Golden, CO (United States); Sullivan, Patrick [National Renewable Energy Lab. (NREL), Golden, CO (United States); Brinkman, Gregory [National Renewable Energy Lab. (NREL), Golden, CO (United States); Margolis, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    Capacity expansion models (CEM) provide a high-level long-term view at the prospects of the evolving power system. In simulating the possibilities of long-term capacity expansion, it is important to maintain the viability of power system operation in the short-term (daily, hourly and sub-hourly) scales. Production-cost models (PCM) simulate routine power system operation on these shorter time scales using detailed load, transmission and generation fleet data by minimizing production costs and following reliability requirements. When based on CEM 'predictions' about generating unit retirements and buildup, PCM provide more detailed simulation for the short-term system operation and, consequently, may confirm the validity of capacity expansion predictions. Further, production cost model simulations of a system that is based on capacity expansion model solution are 'evolutionary' sound: the generator mix is the result of logical sequence of unit retirement and buildup resulting from policy and incentives. The above has motivated us to bridge CEM with PCM by building a capacity expansion - to - production cost model Linking Tool (CEPCoLT). The Linking Tool is built to onset capacity expansion model prescriptions onto production cost model inputs. NREL's ReEDS and Energy Examplar's PLEXOS are the capacity expansion and the production cost models, respectively. Via the Linking Tool, PLEXOS provides details of operation for the regionally-defined ReEDS scenarios.

  17. Safeguard assessment for life extension in nuclear power plants (NPPs) using a production function

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Tae-Ho, E-mail: thw@snu.ac.k [Department of Nuclear Engineering, Seoul National University, Gwanak 599, Gwanak-ro, Gwanak-gu, Seoul 151-742 (Korea, Republic of); Lee, Un-Chul [Department of Nuclear Engineering, Seoul National University, Gwanak 599, Gwanak-ro, Gwanak-gu, Seoul 151-742 (Korea, Republic of)

    2011-03-15

    Research highlights: The numerical value is constructed for the secure operation. As the power increases, the NSEF increases. Specific month could be indicated by the relative value of NSEF. It is suggested for the better power in NPPs. There is another possibility for the secure operation factors. - Abstract: Life extension is investigated as a safeguard assessment for the stability on the operation of the nuclear power plants (NPPs). The Cobb-Douglas function, one of the production functions, is modified for the nuclear safeguard in NPPs, which was developed for the life quality of the social and natural objects. Nuclear Safeguard Estimator Function (NSEF) is developed for the application in NPPs. The cases of NPPs are compared with each other in the aspect of the secure performance. The results are obtained by the standard productivity comparisons with the designed power operations. The range of secure life extension is between 1.008 and 5.353 in 2000 MW{sub e} and the range is between 0.302 and 0.994 in 600 MW{sub e}. So, the successfulness of the power operation increases about 5 times higher than that of the interested power in this study, which means that the safeguard assessment has been performed in the life extension of the NPPs. The technology assessment (TA) is suggested for the safe operation which is an advanced method comparing conventional probabilistic safety assessment (PSA).

  18. Manitoba Hydro's Aboriginal partnerships : a new business model for developing current and future hydro-electric projects

    Energy Technology Data Exchange (ETDEWEB)

    Pachal, S.; Goulet, R. [Manitoba Hydro, Winnipeg, MB (Canada)

    2008-07-01

    Socio-economic as well as environmental considerations have become as important as economic factors when developing hydroelectric power projects. Manitoba Hydro has developed a unique partnership approach to deal more effectively and equitably with the Aboriginal communities of Northern Manitoba who live in proximity to, and are affected by, projects such as the construction of the Wuskwatim3, the Keeyask4 and Conawapa5 generating stations. This paper outlined the genesis of Manitoba Hydro's approach along with the main elements and the expected benefits to both Manitoba Hydro and its partners. Their past approach in dealing with the communities who were in the vicinity of hydro-electric projects was also discussed. Manitoba Hydro's new approach includes the provision of training, employment and business opportunities as well as the possibility of ownership in the project. It is not without challenges, as it increases the costs, adds complexity and slows down the planning process. It also requires much consultation and patience to reconcile different goals and priorities regarding the development of these projects. It can also increase the risks involved by increasing construction or operating costs and even impair the viability of projects. Despite the challenges inherent in such partnerships, Manitoba Hydro sees immediate and long-lasting benefits for itself and the communities involved. 16 refs.

  19. A Computed River Flow-Based Turbine Controller on a Programmable Logic Controller for Run-Off River Hydroelectric Systems

    Directory of Open Access Journals (Sweden)

    Razali Jidin

    2017-10-01

    Full Text Available The main feature of a run-off river hydroelectric system is a small size intake pond that overspills when river flow is more than turbines’ intake. As river flow fluctuates, a large proportion of the potential energy is wasted due to the spillages which can occur when turbines are operated manually. Manual operation is often adopted due to unreliability of water level-based controllers at many remote and unmanned run-off river hydropower plants. In order to overcome these issues, this paper proposes a novel method by developing a controller that derives turbine output set points from computed mass flow rate of rivers that feed the hydroelectric system. The computed flow is derived by summation of pond volume difference with numerical integration of both turbine discharge flows and spillages. This approach of estimating river flow allows the use of existing sensors rather than requiring the installation of new ones. All computations, including the numerical integration, have been realized as ladder logics on a programmable logic controller. The implemented controller manages the dynamic changes in the flow rate of the river better than the old point-level based controller, with the aid of a newly installed water level sensor. The computed mass flow rate of the river also allows the controller to straightforwardly determine the number of turbines to be in service with considerations of turbine efficiencies and auxiliary power conservation.

  20. Exergoeconomic analysis and optimization of combined heat and power production. A review

    Energy Technology Data Exchange (ETDEWEB)

    Abusoglu, Aysegul; Kanoglu, Mehmet [Department of Mechanical Engineering, University of Gaziantep, 27310 Gaziantep (Turkey)

    2009-12-15

    Exergoeconomics is also called thermoeconomics, and thermoeconomic analysis methodologies combine economic and thermodynamic analysis by applying the cost concept to exergy which accounts for the quality of energy. The main concept of thermoeconomics is the exergetic cost and it deals with cost accounting methods. This paper is a review on the exergoeconomic analysis and optimization of combined heat and power production (CHPP). A brief historical overview on the exergoeconomics analysis and optimization is given. The concept of exergetic cost and cost accounting methods are discussed. An application of relevant formulation is given using a diesel engine powered cogeneration system as an example. Main thermoeconomic methodologies available in literature are described and their advantages and disadvantages with respect to one another are compared and discussed through a well-known problem, namely CGAM. Important studies on thermoeconomic analysis and optimization of combined heat and power production are listed based on the methodology used and the type of system considered. (author)

  1. Overview of Maximum Power Point Tracking Techniques for Photovoltaic Energy Production Systems

    DEFF Research Database (Denmark)

    Koutroulis, Eftichios; Blaabjerg, Frede

    2015-01-01

    of photovoltaic sources during stochastically varying solar irradiation and ambient temperature conditions. Thus, the overall efficiency of the photovoltaic energy production system is increased. Numerous techniques have been presented during the last decade for implementing the maximum power point tracking......A substantial growth of the installed photovoltaic systems capacity has occurred around the world during the last decade, thus enhancing the availability of electric energy in an environmentally friendly way. The maximum power point tracking technique enables maximization of the energy production...... process in a photovoltaic system. This article provides an overview of the operating principles of these techniques, which are suited for either uniform or non-uniform solar irradiation conditions. The operational characteristics and implementation requirements of these maximum power point tracking...

  2. Guide for prioritizing power plant productivity improvement projects: handbook of availability improvement methodology

    Energy Technology Data Exchange (ETDEWEB)

    1981-09-15

    As part of its program to help improve electrical power plant productivity, the Department of Energy (DOE) has developed a methodology for evaluating productivity improvement projects. This handbook presents a simplified version of this methodology called the Availability Improvement Methodology (AIM), which provides a systematic approach for prioritizing plant improvement projects. Also included in this handbook is a description of data taking requirements necessary to support the AIM methodology, benefit/cost analysis, and root cause analysis for tracing persistent power plant problems. In applying the AIM methodology, utility engineers should be mindful that replacement power costs are frequently greater for forced outages than for planned outages. Equivalent availability includes both. A cost-effective ranking of alternative plant improvement projects must discern between those projects which will reduce forced outages and those which might reduce planned outages. As is the case with any analytical procedure, engineering judgement must be exercised with respect to results of purely mathematical calculations.

  3. Beyond "on" or "with": Questioning Power Dynamics and Knowledge Production in "Child-Oriented" Research Methodology

    Science.gov (United States)

    Hunleth, Jean

    2011-01-01

    By taking a reflexive approach to research methodology, this article contributes to discussions on power dynamics and knowledge production in the social studies of children. The author describes and analyzes three research methods that she used with children--drawing, child-led tape-recording and focus group discussions. These methods were carried…

  4. Planning the production of a fleet of domestic combined heat and power generators

    NARCIS (Netherlands)

    Bosman, M.G.C.; Bakker, Vincent; Molderink, Albert; Hurink, Johann L.; Smit, Gerardus Johannes Maria

    2012-01-01

    This paper describes a planning problem, arising in the energy supply chain, that deals with the planning of the production runs of micro combined heat and power (microCHP) appliances installed in houses, cooperating in a fleet. Two types of this problem are described. The first one is the Single

  5. The influence of ERP implementation on the division of power at the production-sales interface

    NARCIS (Netherlands)

    de Vries, J.; Boonstra, A.

    2012-01-01

    Purpose - The purpose of this paper is to develop and validate a model that demonstrates the influence of enterprise resource planning (ERP) implementation on the power and interests of actors at the production-sales interface, and vice versa. Design/methodology/approach - An empirical in-depth

  6. Governmentalizing Gramsci : Topologies of power and passive revolution in Cambodia’s garment production network

    NARCIS (Netherlands)

    Arnold, D.; Hess, M.

    2017-01-01

    This article takes a fresh look at the multiple power relations between state, capital and labor in global production networks. Moving beyond debates about public vs. private governance, it brings together Antonio Gramsci’s concepts of hegemony and the integral state with Michel Foucault’s concepts

  7. Hydrogen-oxygen steam generator applications for increasing the efficiency, maneuverability and reliability of power production

    Science.gov (United States)

    Schastlivtsev, A. I.; Borzenko, V. I.

    2017-11-01

    The comparative feasibility study of the energy storage technologies showed good applicability of hydrogen-oxygen steam generators (HOSG) based energy storage systems with large-scale hydrogen production. The developed scheme solutions for the use of HOSGs for thermal power (TPP) and nuclear power plants (NPP), and the feasibility analysis that have been carried out have shown that their use makes it possible to increase the maneuverability of steam turbines and provide backup power supply in the event of failure of the main steam generating equipment. The main design solutions for the integration of hydrogen-oxygen steam generators into the main power equipment of TPPs and NPPs, as well as their optimal operation modes, are considered.

  8. Statistical Analysis of Power Production from OWC Type Wave Energy Converters

    DEFF Research Database (Denmark)

    Martinelli, L.; Zanuttigh, B.; Kofoed, Jens Peter

    2009-01-01

    Oscillating Water Column based wave energy plants built so far have experienced a low efficiency in the conversion of the bidirectional oscillating flow. A new concept is considered here, the LeanCon Wave Energy Converter (WEC), that unifies the flow direction by use of non-return valves......, into a unidirectional flow, making the use of more efficient air turbines possible. Hereby, a more steady flow is also obtained. The general objective of this note is to examine, the power take off (PTO) efficiency under irregular wave conditions, for WECs with flow redirection. Final practical aim is to identify......, the power measured at the modelled PTO is compared with the available incident wave power in order to examine the overall system response in a scaleindependent manner. Then, the power production density function is fitted to a simplified shape, whose parameters are related to the tested sea state conditions...

  9. Power

    OpenAIRE

    Hafford-Letchfield, Trish

    2015-01-01

    This chapter looks at the concept of power in social work by focusing on what this means as a ‘professional’ and theorizes competing discourses of empowerment in social work and its key concepts, drawing in particular on the explanatory powers of critical theorist Michel Foucault (1991). The chapter problematizes the concept of power by explicitly drawing on both users’ and carers’ accounts from the literature to demonstrate different external and internal influences on the root causes of dis...

  10. Reference costs for power generation; Couts de reference de la production electrique

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-12-01

    The first part of the 2003 study of reference costs for power generation has been completed. It was carried out by the General Directorate for Energy and Raw Materials (DGEMP) of the French Ministry of the Economy, Finance and Industry, with the collaboration of power-plant operators, construction firms and many other experts. A Review Committee of experts including economists (Forecasting Department, French Planning Office), qualified public figures, representatives of power-plant construction firms and operators, and non-governmental organization (NGO) experts, was consulted in the final phase. The study examines the costs of power generated by different methods (i.e. nuclear and fossil-fuel [gas-, coal-, and oil-fired] power plants) in the context of an industrial operation beginning in the year 2015. - The second part of the study relating to decentralized production methods (wind, photovoltaic, combined heat and power) is still in progress and will be presented at the beginning of next year. - 1. Study approach: The study is undertaken mainly from an investor's perspective and uses an 8% discount rate to evaluate the expenses and receipts from different years. In addition, the investment costs are considered explicitly in terms of interest during construction. - 2. Plant operating on a full-time basis (year-round): The following graph illustrates the main conclusions of the study for an effective operating period of 8000 hours. It can be seen that nuclear is more competitive than the other production methods for a year-round operation with an 8% discount rate applied to expenses. This competitiveness is even better if the costs related to greenhouse-gas (CO{sub 2}) emission are taken into account in estimating the MWh cost price. Integrating the costs resulting from CO{sub 2} emissions by non-nuclear fuels (gas, coal), which will be compulsory as of 2004 with the transposition of European directives, increases the total cost per MWh of these power

  11. Thermodynamic Analysis of a Ship Power Plant Operating with Waste Heat Recovery through Combined Heat and Power Production

    Directory of Open Access Journals (Sweden)

    Mirko Grljušić

    2014-11-01

    Full Text Available The goal of this research is to study a cogeneration plant for combined heat & power (CHP production that utilises the low-temperature waste energy in the power plant of a Suezmax-size oil tanker for all heating and electricity requirements during navigation. After considering various configurations, a standard propulsion engine operating at maximum efficiency and a CHP Plant with R245fa fluid using a supercritical organic Rankine cycle (ORC is selected. All the ship heat requirements can be covered by energy of organic fluid after expansion in the turbine, except feeder-booster heating. Hence, an additional quantity of working fluid may be heated using an after Heat Recovery Steam Generator (HRSG directed to the feeder-booster module. An analysis of the obtained results shows that the steam turbine plant does not yield significant fuel savings. However, a CHP plant with R245fa fluid using supercritical ORC meets all of the demands for electrical energy and heat while burning only a small amount of additional fuel in HRSG at the main engine off-design operation.

  12. Downstream environmental impacts of dams: case study Tucurui Hydroelectric Plant, PA; Impactos ambientais a jusante de hidreletricas: o caso da usina de Tucurui, PA

    Energy Technology Data Exchange (ETDEWEB)

    Manyari, Waleska Valenca

    2007-12-15

    The hydroelectric resources of the Amazon region are considered a competitive alternative despite the structural problems they entail. Concerning the latter, plans to build large-scale dams in the region have drawn criticism mainly on account of the loss of forest cover in areas flooded by dam reservoirs and the conflicts concerning the relocation of indigenous and riverside communities in the region. This study seeks to contribute to better understanding of the environmental issue in the Amazon by focusing attention on the downstream effects of dams, which have large-scale, hitherto neglected ecological repercussions. The impact of dams extends well beyond the area surrounding the artificial lakes they create, harming rich Amazon wetland ecosystems. The morphology of dammed rivers changes in response to new inputs of energy and matter, which may in turn destroy certain biotypes. This is a remote-sensing-based case study of the Tucurui hydroelectric scheme in the Amazon state of Para. Attention is drawn to the need to take into account effects on alluvial rivers downstream from hydroelectric power plants when it comes to making planning decisions, as part of a sustainable energy policy. (author)

  13. Raptor observations associated with Terror Lake hydroelectric project: 1984 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — Raptors in the vicinity of the Terror Lake Hydroelectric Project (TLHP) were studied to determine the effects of project construction and operation on nesting and...

  14. Raptor observations associated with Terror Lake Hydroelectric Project: 1983 annual progress report

    Data.gov (United States)

    US Fish and Wildlife Service, Department of the Interior — The report discusses the modification to both bald eagles and rough-legged hawk nesting behavior seen in the Terror Lake Hydroelectric Project area during 1983. A...

  15. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  16. 77 FR 21556 - Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District...

    Science.gov (United States)

    2012-04-10

    ... From the Federal Register Online via the Government Publishing Office DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Don Pedro Hydroelectric Project: Turlock Irrigation District; Modesto Irrigation District; Supplement to Notice of Study Dispute Resolution Technical Conference On March 16, 2012...

  17. Electricity production and SO{sub 2} emissions in Poland`s power industry

    Energy Technology Data Exchange (ETDEWEB)

    Salay, J.

    1996-09-01

    The report analyzes how the Polish power industry`s electricity production and SO{sub 2} emissions have changed between 1988 and 1994. It examines to what extent the Polish government`s reform of air pollution control and its reorganization of the power industry affected power plant`s SO{sub 2} emissions in the same period. SO{sub 2} emissions from Polish power plants fell by 37% in 1988-1994. The drop in emissions was partly a result of the fall in economic activity and electricity production in the early 1990s. The main reasons for the emission reduction were the introduction of hard budget constraints, increased coal prices, and stricter enforcement of air pollution control. These reforms created strong incentives for power plants to switch to high-quality coal with lower sulfur content and higher heating value. Improved efficiency of electricity generation also contributed to the fall in SO{sub 2} emissions. 32 refs, 15 figs, 1 tab

  18. Impact of climate change on future concentrated solar power (CSP) production

    Science.gov (United States)

    Wild, Martin; Folini, Doris; Henschel, Florian

    2017-02-01

    Traditionally, for the planning and assessment of solar power plants, the amount of solar radiation incident on the Earth's surface is assumed to be invariable over the years. However, with changing climate and air pollution levels, solar resources may no longer be stable over time and undergo substantial decadal changes. Observational records covering several decades indeed confirm long-term changes in this quantity. In a previous study (Wild et al. 2015, Solar Energy)1 we examined how the latest generation of climate models (CMIP5) projects potential changes in surface solar radiation over the coming decades, and how this may affect, in combination with the expected greenhouse warming, future power output from photovoltaic (PV) systems. In the present complementary study, we use the CMIP5 model projections to estimate possible future changes in power output from Concentrated Solar Power (CSP) systems due to changing climate and air pollution levels up to the mid-21th century. The results indicate a potential for future increases in CSP production in many parts of the globe, with few exceptions such as the North of India and the irrelevant polar areas. Compared to the changes in PV production, the estimated future production changes by CSP are larger by a factor of 4.

  19. The new automotive 42V PowerNet. Preparing for mass production

    Energy Technology Data Exchange (ETDEWEB)

    Graf, A. (ed.)

    2001-07-01

    A number of international auto makers have set themselves the target of getting an automobile with a dual 12V/42V PowerNet into mass production by the year 2005. Reports on practical experience of current projects at leading international auto makers and suppliers allow the reader to get a picture of the status of introduction of the 42V PowerNet and of the problems associated with translating development work into mass production, providing them with an idea of the opportunities for structuring their own company or organizing company activities. The book gives an overview of the problems of introducing the 42V PowerNet into automotive engineering. The basic question here is not 'Why 42V?' but rather 'How can a 42V system be introduced into mass production alongside an existing 12V system?''. It provides information from the standpoint of the engineer and the businessman on: The problems of introduction as seen by the auto maker - Proposed solutions to detailed problems such as short circuits and sparking-System reviews, such as Intelligent Power Management - Suggestions for individual components, such as individual semiconductors - Suggested solutions involving new materials - Solution variants and verification by simulation. (orig.)

  20. Medical Radioisotope Production in a Power-Flattened ADS Fuelled with Uranium and Plutonium Dioxides

    Directory of Open Access Journals (Sweden)

    Gizem Bakır

    2016-01-01

    Full Text Available This study presents the medical radioisotope production performance of a conceptual accelerator driven system (ADS. Lead-bismuth eutectic (LBE is selected as target material. The subcritical fuel core is conceptually divided into ten equidistant subzones. The ceramic (natural U, PuO2 fuel mixture and the materials used for radioisotope production (copper, gold, cobalt, holmium, rhenium, thulium, mercury, palladium, thallium, molybdenum, and yttrium are separately prepared as cylindrical rods cladded with carbon/carbon composite (C/C and these rods are located in the subzones. In order to obtain the flattened power density, percentages of PuO2 in the mixture of UO2 and PuO2 in the subzones are adjusted in radial direction of the fuel zone. Time-dependent calculations are performed at 1000 MW thermal fission power (Pth for one hour using the BURN card. The neutronic results show that the investigated ADS has a high neutronic capability, in terms of medical radioisotope productions, spent fuel transmutation and energy multiplication. Moreover, a good quasiuniform power density is achieved in each material case. The peak-to-average fission power density ratio is in the range of 1.02–1.28.

  1. Power production from biomass III. Gasification and pyrolysis R and D and D for industry

    Energy Technology Data Exchange (ETDEWEB)

    Sipilae, K.; Korhonen, M. [eds.] [VTT Energy, Espoo (Finland). New Energy Technologies

    1999-07-01

    The Seminar on Power Production from Biomass III. Gasification and Pyrolysis R and D and D for Industry, was held on 14-15 September 1998 in Espoo. The seminar was organised by VTT Energy in co-operation with the University of Groningen, EU-Thermie Programme and Technology Development Centre, Finland (Tekes). Overviews of current activities on power production from biomass and wastes in Europe and in the United States were given, and all European and U. S. demonstration projects on biomass gasification were presented. In Europe, the target is to produce additional 90 Mtoe/a of bioenergy for the market by 2010. This is a huge challenge for the bioenergy sector, including biomass production and harvesting, conversion technology, energy companies, and end users. In USA, U.S. Department of Energy is promoting the Biomass Power Programme to encourage and assist industry in the development and validation of renewable, biomass-based electricity generation systems, the objective being to double the present use of 7 000 MW biomass power by the year 2010. The new Finnish PROGAS Programme initiated by VTT was also introduced. Several gasification projects are today on the demonstration stage prior to entering the commercial level. Pyrolysis technologies are not yet on the demonstration stage on the energy market. Bio-oils can easily be transported, stored and utilised in existing boiler and diesel plants. The proceedings include the presentations given by the keynote speakers and other invited speakers, as well as some extended poster presentations. (orig.)

  2. Syngas production from tar reforming by microwave plasma jet at atmospheric pressure: power supplied influence

    Science.gov (United States)

    de Souza Medeiros, Henrique; Justiniano, Lucas S.; Gomes, Marcelo P.; Soares da Silva Sobrinho, Argemiro; Petraconi Filho, Gilberto

    2013-09-01

    Now a day, scientific community is searching for new fuels able to replace fossil fuels with economic and environment gains and biofuel play a relevant rule, mainly for the transport sector. A major process to obtaining such type of renewable resource is biomass gasification. This process has as product a gas mixture containing CO, CH4, and H2 which is named synthesis gas (syngas). However, an undesirable high molecular organic species denominated tar are also produced in this process which must be removed. In this work, results of syngas production via tar reforming in the atmospheric pressure microwave discharge having as parameter the power supply. Argon, (argon + ethanol), and (argon + tar solution) plasma jet were produced by different values of power supplied (from 0.5 KW to 1.5 KW). The plasma compounds were investigated by optical spectroscopy to each power and gas composition. The main species observed in the spectrum are Ar, CN, OII, OIV, OH, H2, H(beta), CO2, CO, and SIII. This last one came from tar. The best value of the power applied to syngas production from tar reforming was verified between 1.0 KW and 1.2 KW. We thank the following institutions for financial support: CNPq, CAPES, and FAPESP.

  3. LED power efficiency of biomass, fatty acid, and carotenoid production in Nannochloropsis microalgae.

    Science.gov (United States)

    Ma, Ruijuan; Thomas-Hall, Skye R; Chua, Elvis T; Eltanahy, Eladl; Netzel, Michael E; Netzel, Gabriele; Lu, Yinghua; Schenk, Peer M

    2017-12-29

    The microalga Nannochloropsis produces high-value omega-3-rich fatty acids and carotenoids. In this study the effects of light intensity and wavelength on biomass, fatty acid, and carotenoid production with respect to light output efficiency were investigated. Similar biomass and fatty acid yields were obtained at high light intensity (150 μmol m-2 s-1) LEDs on day 7 and low light intensity (50 μmol m-2 s-1) LEDs on day 11 during cultivation, but the power efficiencies of biomass and fatty acid (specifically eicosapentaenoic acid) production were higher for low light intensity. Interestingly, low light intensity enhanced both, carotenoid power efficiency of carotenoid biosynthesis and yield. White LEDs were neither advantageous for biomass and fatty acid yields, nor the power efficiency of biomass, fatty acid, and carotenoid production. Noticeably, red LED resulted in the highest biomass and fatty acid power efficiency, suggesting that LEDs can be fine-tuned to grow Nannochloropsis algae more energy-efficiently. Copyright © 2017 Elsevier Ltd. All rights reserved.

  4. State of the arch dam and foundation of the Inguri Hydroelectric Station

    Energy Technology Data Exchange (ETDEWEB)

    Bronshtein, V.I.

    1994-08-01

    The Inguri hydroelectric station (HES) is a cascade of hydroelectric stations including, in addition to the dam - diversion installation of the Inguri HES proper, the near-dam installation of the Perepad HES-1 and three similar channel installations of the Perepad HESs-2, -3, and -4 located on the tailrace emptying into the Black Sea. The HESs of the cascade use the fall of two rivers, the Inguri and Eristskali, by diverting the waters of the Inguri into the Eristskali.

  5. How wing kinematics affect power requirements and aerodynamic force production in a robotic bat wing.

    Science.gov (United States)

    Bahlman, Joseph W; Swartz, Sharon M; Breuer, Kenneth S

    2014-06-01

    Bats display a wide variety of behaviors that require different amounts of aerodynamic force. To control and modulate aerodynamic force, bats change wing kinematics, which, in turn, may change the power required for wing motion. There are many kinematic mechanisms that bats, and other flapping animals, can use to increase aerodynamic force, e.g. increasing wingbeat frequency or amplitude. However, we do not know if there is a difference in energetic cost between these different kinematic mechanisms. To assess the relationship between mechanical power input and aerodynamic force output across different isolated kinematic parameters, we programmed a robotic bat wing to flap over a range of kinematic parameters and measured aerodynamic force and mechanical power. We systematically varied five kinematic parameters: wingbeat frequency, wingbeat amplitude, stroke plane angle, downstroke ratio, and wing folding. Kinematic values were based on observed values from free flying Cynopterus brachyotis, the species on which the robot was based. We describe how lift, thrust, and power change with increases in each kinematic variable. We compare the power costs associated with generating additional force through the four kinematic mechanisms controlled at the shoulder, and show that all four mechanisms require approximately the same power to generate a given force. This result suggests that no single parameter offers an energetic advantage over the others. Finally, we show that retracting the wing during upstroke reduces power requirements for flapping and increases net lift production, but decreases net thrust production. These results compare well with studies performed on C. brachyotis, offering insight into natural flight kinematics.

  6. Tazimina hydroelectric project, Iliamna, Alaska. Final technical and construction cost report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-08-01

    The Iliamna-Newhalen-Nondalton Electric Cooperative (INNEC) provides electrical power to three communities of the same names. These communities are located near the north shore of Iliamna Lake in south-central Alaska approximately 175 miles southwest of Anchorage. A hydroelectric project was constructed for these communities, starting in the spring of 1996 and ending in the spring of 1998. The project site is on the Tazimina River about 12 miles northeast of Iliamna Lake. The taximina River flows west from the Aleutian Range. The project site is at Tazimina Falls about 9 miles upstream of the confluence of the Tazimina River and the Newhalen River. The project has an installed capacity of 824 kilowatts (kW) and is expandable to 1.5 megawatts (MW). The project is run-of-the-river (no storage) and uses the approximately 100 feet of natural head provided by the falls. The project features include a channel control sill, intake structure, penstock, underground powerhouse, tailrace, surface control building, buried transmission line and communication cable, and access road.

  7. Hydroelectric microcentrals for small consumption centers; Microcentrales hidroelectricas para pequenos centros de consumo

    Energy Technology Data Exchange (ETDEWEB)

    Angeles A, V. H.; Espino C, F. P. [Universidad Autonoma Metropolitana, Mexico, D. F. (Mexico); Buitron Sanchez, H. C. [Programa de Ahorro de Energia para el Sector Electrico, Mexico, D. F. (Mexico)

    1995-12-31

    The utilization of alternate energy sources (wind power, solar and hydro to small scale) represents an option for the rural electrification. This paper analyzes the case of hydro microgeneration, for this purpose the mechanical and electrical fitting are mainly discussed. For the mechanical re-equipment the turbine types that can be used are fundamentally presented and how they can be selected. As to the electrical re-equipment the different types of electric generators are discussed, as well as the form of selecting them, the operation, the control and the protection in the hydroelectric microcentrals. [Espanol] La utilizacion de fuentes alternas de energia (eolica, solar e hidraulica a pequena escala) representan una alternativa para la electrificacion rural. Este trabajo trata del caso de la microgeneracion hidraulica para la cual se discuten principalmente, alternativas para el equipamiento mecanico y electrico. Para el equipamiento mecanico se presentan fundamentalmente los tipos de turbinas que pueden ser utilizadas y como se pueden seleccionar. En cuanto al equipo electrico se manejan los diferentes tipos de generadores, la forma de seleccionarlos, la operacion, el control y la proteccion en las microcentrales hidroelectricas.

  8. Insuring wind energy production

    Science.gov (United States)

    D'Amico, Guglielmo; Petroni, Filippo; Prattico, Flavio

    2017-02-01

    This paper presents an insurance contract that the supplier of wind energy may subscribe in order to immunize the production of electricity against the volatility of the wind speed process. The other party of the contract may be any dispatchable energy producer, like gas turbine or hydroelectric generator, which can supply the required energy in case of little or no wind. The adoption of a stochastic wind speed model allows the computation of the fair premium that the wind power supplier has to pay in order to hedge the risk of inadequate output of electricity at any time. Recursive type equations are obtained for the prospective mathematical reserves of the insurance contract and for their higher order moments. The model and the validity of the results are illustrated through a numerical example.

  9. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  10. Spatial Trade-Offs between Wind Power Production and Bird Collision Avoidance in Agricultural Landscapes

    Directory of Open Access Journals (Sweden)

    Marcus Eichhorn

    2010-06-01

    Full Text Available The expansion of renewable energy production is seen as an appropriate way to mitigate climate change. Renewable energies are not free of negative external effects on humans and the natural environment. We analyzed the conflict between wind power production and bird protection through the example of one of the most sensitive species, the red kite (Milvus milvus in West Saxony, Germany. We investigated a large number of potential land use scenarios, defined by whether or not each potential site contained a wind turbine (WT. Based on meteorological and ornithological data, we evaluated the land use scenarios for their annual energy supply and impact on the red kite. We identified the efficient land use scenarios that maximized energy supply for a given ecological impact. Within the scope of our analysis, the current allocation of WTs in the study region was considered inefficient. The set of efficient scenarios allowed us to draw conclusions on the trade-offs involved. We developed an indicator that measures the severity of the conflict between wind power production and bird protection. Increasing the minimum distance of WTs to settlements beyond the legal requirements in order to minimize the impact on humans further intensifies the conflict. Our results can support planning authorities in their development of long-term regional plans by identifying areas that are most suitable for wind power production from an integrated point of view.

  11. HelioTrope: An innovative and efficient prototype for solar power production

    Directory of Open Access Journals (Sweden)

    Papageorgiou George

    2014-01-01

    Full Text Available The solar energy alternative could provide us with all the energy we need as it exist in vast quantities all around us. We only should be innovative enough in order to improve the efficiency of our systems in capturing and converting solar energy in usable forms of power. By making a case for the solar energy alternative, we identify areas where efficiency can be improved and thereby Solar Energy can become a competitive energy source. This paper suggests an innovative approach to solar energy power production, which is manifested in a prototype given the name HelioTrope. The Heliotrope Solar Energy Production prototype is tested on its' capabilities to efficiently covert solar energy to generation of electricity and other forms of energy for storage or direct use. HelioTrope involves an innovative Stirling engine design and a parabolic concentrating dish with a sun tracking system implementing a control algorithm to maximize the capturing of solar energy. Further, it utilizes a patent developed by the authors where a mechanism is designed for the transmission of reciprocating motion of variable amplitude into unidirectional circular motion. This is employed in our prototype for converting linear reciprocating motion into circular for electricity production, which gives a significant increase in efficiency and reduces maintenance costs. Preliminary calculations indicate that the Heliotrope approach constitutes a competitive solution to solar power production.

  12. Biological effects of activation products and other chemicals released from fusion power plants

    Energy Technology Data Exchange (ETDEWEB)

    Strand, J.A.; Poston, T.M.

    1976-09-01

    Literature reviews indicate that existing information is incomplete, often contradictory, and of questionable value for the prediction and assessment of ultimate impact from fusion-associated activation products and other chemical releases. It is still uncertain which structural materials will be used in the blanket and first wall of fusion power plants. However, niobium, vanadium, vanadium-chromium alloy, vanadium-titanium alloy, sintered aluminum product, and stainless steel have been suggested. The activation products of principal concern will be the longer-lived isotopes of /sup 26/Al, /sup 49/V, /sup 51/Cr, /sup 54/Mn, /sup 55/Fe, /sup 58/Co, /sup 60/Co, /sup 93/Nb, and /sup 94/Nb. Lithium released to the environment either during the mining cycle, from power plant operation or accident, may be in the form of a number of compound types varying in solubility and affinity for biological organisms. The effects of a severe liquid metal fire or explosion involving Na or K will vary according to inherent abiotic and biotic features of the affected site. Saline, saline-alkaline, and sodic soils of arid lands would be particularly susceptible to alkaline stress. Beryllium released to the environment during the mining cycle or reactor accident situation could be in the form of a number of compound types. Adverse effects to aquatic species from routine chemical releases (biocides, corrosion inhibitors, dissolution products) may occur in the discharge of both fission and fusion power plant designs.

  13. Fission product behavior during the PBF (Power Burst Facility) Severe Fuel Damage Test 1-1

    Energy Technology Data Exchange (ETDEWEB)

    Hartwell, J K; Petti, D A; Hagrman, D L; Jensen, S M; Cronenberg, A W

    1987-05-01

    In response to the accident at Three Mile Island Unit 2 (TMI-2), the United States Nuclear Regulatory Commission (USNRC) initiated a series of Severe Fuel Damage tests that were performed in the Power Burst Facility at the Idaho National Engineering Laboratory to obtain data necessary to understand (a) fission product release, transport, and deposition; (b) hydrogen generation; and (c) fuel/cladding material behavior during degraded core accidents. Data are presented about fission product behavior noted during the second experiment of this series, the Severe Fuel Damage Test 1-1, with an in-depth analysis of the fission product release, transport, and deposition phenomena that were observed. Real-time release and transport data of certain fission products were obtained from on-line gamma spectroscopy measurements. Liquid and gas effluent grab samples were collected at selected periods during the test transient. Additional information was obtained from steamline deposition analysis. From these and other data, fission product release rates and total release fractions are estimated and compared with predicted release behavior using current models. Fission product distributions and a mass balance are also summarized, and certain probable chemical forms are predicted for iodine, cesium, and tellurium. An in-depth evaluation of phenomena affecting the behavior of the high-volatility fission products - xenon, krypton, iodine, cesium, and tellurium - is presented. Analysis indicates that volatile release from fuel is strongly influenced by parameters other than fuel temperature. Fission product behavior during transport through the Power Burst Facility effluent line to the fission product monitoring system is assessed. Tellurium release behavior is also examined relatve to the extent of Zircaloy cladding oxidation. 81 fig., 53 tabs.

  14. The Effect of External Loading on Force and Power Production during Plyometric Push-ups.

    Science.gov (United States)

    Hinshaw, Taylour J; Stephenson, Mitchell L; Sha, Zhanxin; Dai, Boyi

    2017-04-15

    One common exercise to train upper body strength and power is the push-up. Training at the loads that would produce the greatest power is an effective way to increase peak power. The purpose of the current study was to quantify the changes in peak force, peak power, and peak velocity among a modified plyometric push-up and plyometric push-ups with or without external loading in physically-active young adults. Eighteen male and seventeen female participants completed four push-ups: (1) modified plyometric push-up on the knees, (2) plyometric push-up without external loading, (3) plyometric push-up with an external load of 5% body weight, and (4) plyometric push-up with an external load of 10% body weight. Two force platforms were set up to collect vertical ground reaction forces at the hands and feet. The modified plyometric push-up demonstrated the lowest force, power, and velocity (5.4 ≥ Cohen's dz ≥ 1.2). Peak force and force at peak velocity increased (3.8 ≥ Cohen's dz ≥ 0.3) and peak velocity and velocity at peak power decreased (1.4 ≥ Cohen's dz ≥ 0.8) for the push-up without external loading compared with the two push-ups with external loading. No significant differences were observed for peak power among the push-ups with or without external loading (0.4 ≥ Cohen's dz ≥ 0.1). While peak power is similar with or without external loading, push-ups without external loading may be more beneficial for a quick movement, and push-ups with external loading may be more beneficial for a greater force production.

  15. Influence of environmental factors on mercury release in hydroelectric reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, K.; Therien, N.

    1991-04-01

    Due to increased mercury concentrations in fish in hydro-electric reservoirs after flooding, a study was carried out to evaluate the release and transformation of mercury due to vegetation and soil flooded as a result of reservoir creation. Samples of vegetation and soils were immersed in water and concentrations of total mercury, methylmercury and nutrients were followed. The effects of anoxia, pH and temperature on release and transformation were examined. An existing dynamic model of decomposition of flooded materials in reservoirs was modified to include mercury release and transformation, and was calibrated to the experimental data. Amounts of mercury released by the different substrates was of the same order of magnitude. Tree species contributed to the greatest amounts of methylmercury per unit biomass, but the biomass used for these was twigs and foliage. Soil released significant amounts of mercury, but methylation was very low. The model was able to fit well for all substrates except lichen. The model can be adapted to proposed reservoirs to predict nutrient and mecury release and transformation. 175 refs., 38 figs., 38 tabs.

  16. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  17. 78 FR 8493 - Foreign-Trade Zone 45-Portland, OR; Notification of Proposed Production Activity; SoloPower Inc...

    Science.gov (United States)

    2013-02-06

    ... Activity; SoloPower Inc. (Thin Film Photovoltaic Solar Panels); Portland, OR SoloPower Inc. (SoloPower) has... production of thin film photovoltaic solar panels. Pursuant to 15 CFR 400.14(b), FTZ activity would be... sourced from abroad include: Polymer film; diodes; conductive paste; junction boxes; sealant; silicone...

  18. Predicted and verified evolution of power-law exponent in product market

    CERN Document Server

    Hisano, Ryohei; Mizuno, Takayuki

    2011-01-01

    Power-law distributions constitute a generic empirical statistical regularity found in many complex systems. A recently developed theory finds that the interplay between one of the most universal ingredient, i.e., stochastic proportional growth, and stochastic birth and death processes, leads to generic power law distributions together with a non-universal exponent which depends explicitly on the characteristics of growth, birth and death. In particular, the theory rationalizes Zipf's law and explains deviations from it, for instance for the distribution of firm and of city sizes. Here, we report the first complete test of the theory, based on the empirical analysis from a real world complex phenomenon, namely the dynamics of market shares in the consumer electronics market. We estimate directly from the data the average growth rate of market shares, their standard deviation, the birth rates as well as the "death" hazard rate of products. When plugged in the theory, this predicts the power law exponent of the...

  19. Water Stress on U.S. Power Production at Decadal Time Horizons

    Energy Technology Data Exchange (ETDEWEB)

    Ganguly, Auroop R. [Northeastern Univ., Boston, MA (United States). Sustainability and Data Sciences Lab.. Civil and Environmental Engineering Dept.; Ganguli, Poulomi [Northeastern Univ., Boston, MA (United States). Sustainability and Data Sciences Lab.; Kumar, Devashish [Northeastern Univ., Boston, MA (United States). Sustainability and Data Sciences Lab.

    2014-09-01

    Thermoelectric power production at risk, owing to current and projected water scarcity and rising stream temperatures, is assessed for the contiguous United States at decadal scales. Regional water scarcity is driven by climate variability and change, as well as by multi-sector water demand. While a planning horizon of zero to about thirty years is occasionally prescribed by stakeholders, the challenges to risk assessment at these scales include the difficulty in delineating decadal climate trends from intrinsic natural or multiple model variability. Current generation global climate or earth system models are not credible at the spatial resolutions of power plants, especially for surface water quantity and stream temperatures, which further exacerbates the assessment challenge. Population changes, which are difficult to project, cannot serve as adequate proxies for changes in the water demand across sectors. The hypothesis that robust assessments of power production at risk are possible, despite the uncertainties, has been examined as a proof of concept. An approach is presented for delineating water scarcity and temperature from climate models, observations and population storylines, as well as for assessing power production at risk by examining geospatial correlations of power plant locations within regions where the usable water supply for energy production happens to be scarcer and warmer. Our analyses showed that in the near term, more than 200 counties are likely to be exposed to water scarcity in the next three decades. Further, we noticed that stream gauges in more than five counties in the 2030s and ten counties in the 2040s showed a significant increase in water temperature, which exceeded the power plant effluent temperature threshold set by the EPA. Power plants in South Carolina, Louisiana, and Texas are likely to be vulnerable owing to climate driven water stresses. In all, our analysis suggests that under various combinations of plausible climate

  20. Exergy analysis of a combined heat and power plant with integrated lignocellulosic ethanol production

    DEFF Research Database (Denmark)

    Lythcke-Jørgensen, Christoffer Ernst; Haglind, Fredrik; Clausen, Lasse Røngaard

    2014-01-01

    Lignocellulosic ethanol production is often assumed integrated in polygeneration systems because of its energy intensive nature. The objective of this study is to investigate potential irreversibilities from such integration, and what impact it has on the efficiency of the integrated ethanol...... production. An exergy analysis is carried out for a modelled polygeneration system in which lignocellulosic ethanol production based on hydrothermal pretreatment is integrated in an existing combined heat and power (CHP) plant. The ethanol facility is driven by steam extracted from the CHP unit when feasible...... in the ethanol facility. The calculated standard exergy efficiency of the ethanol facility varied from 0.564 to 0.855, of which the highest was obtained for integrated operation at reduced CHP load and full district heating production in the ethanol facility, and the lowest for separate operation with zero...

  1. Possibilities of Combined Heat and Power Production in Šiauliai Region

    Directory of Open Access Journals (Sweden)

    Martynas Mickus

    2011-02-01

    Full Text Available The article investigates the possibilities of biomass and municipal waste utilization in Šiauliai region by introducing a combined heat and power production plant. The paper presents an overview of biomass and municipal waste composition and identifies its heat value and generation quantities. Investigation includes modelling CHP plant operation based on real data that includes detailed information on actual heat load in Šiauliai, the current amount and prognosis of biomass production and waste generation in the area. Modelling suitable power plant size is performed. Economic evaluation has shown that the current economical indicators are poor. Energy generation from waste still requires additional support in order to be competitive.Article in Lithuanian

  2. Progress on 241Am Production for Use in Radioisotope Power Systems

    Science.gov (United States)

    Baker, S. R.; Bell, K. J.; Brown, J.; Carrigan, C.; Carrott, M. J.; Gregson, C.; Clough, M.; Maher, C. J.; Mason, C.; Rhodes, C. J.; Rice, T. G.; Sarsfield, M. J.; Stephenson, K.; Taylor, R. J.; Tinsley, T. P.; Woodhead, D. A.; Wiss, T.

    2014-08-01

    Electrical power sources used in outer planet missions are a key enabling technology for data acquisition and communications. Power sources generate electricity from the thermal energy from alpha decay of the radioisotope 238Pu via thermo-electric conversion. Production of 238Pu requires specialist facilities including a nuclear reactor and reprocessing plants that are expensive to build and operate, so naturally, a more economical alternative is attractive to the industry. Within Europe 241Am is a feasible alternative to 238Pu that can provide a heat source for radioisotope thermoelectric generators (RTGs) and radioisotope heating units (RHUs). As a daughter product of 241Pu decay, 241Am is present at 1000s kg levels within the UK civil plutonium stockpile.A chemical separation process is required to extract the 241Am in a pure form and this paper describes such a process, successfully developed to the proof of concept stage.

  3. Pedaling power and speed production vs. technical factors and track difficulty in bicycle motocross cycling.

    Science.gov (United States)

    Mateo, Manuel; Blasco-Lafarga, Cristina; Zabala, Mikel

    2011-12-01

    Mateo, M, Blasco-Lafarga, C, and Zabala, M. Pedaling power and speed production vs. technical factors and track difficulty in BMX cycling. J Strength Cond Res 25(12): 3248-3256, 2011-This article analyzes whether there is a determined profile in the production of cyclic and acyclic periods in relation to the phases of a bicycle motocross (BMX) race and whether this profile is related to the variables, Difficulty of track and Techniques used. After an initial test for determining maximum pedaling power (Pmax), 9 athletes belonging to the Spanish national team completed 3 series of 3 different types of races: (a) Complete track without pedaling; (b) Track, pedaling only at the gate start; and (c) track with free pedaling. The triple test was carried out over 3 days and on different level tracks: (a) high difficulty (HD), (b) medium difficulty (MD), and (c) low difficulty (LD). Our results show that average peak power applied in the BMX race was 85.21 ± 2.15% Pmax, coming down to 73.02 ± 18.38% at the gate start and to 51.37 ± 15.84% on the first straight. On the other hand, mean power (MP) in the BMX race is 33.79 ± 8.60% MPmax, with statistically significant differences in relation to the difficulty of the track (p track. Acyclic efforts accounted for 86.3%, and cyclic efforts accounted for the remaining 16.7% of the overall performance in the race, with differences in relation to the difficulty of the track (p ≤ 0.003). Both power profile and performance (measured as velocity) are dependent on the phases and techniques of the race and are significantly affected by the level of difficulty of the track. The greater the technical level of the track, the lesser the possibility of developing cyclic power and vice versa.

  4. Assessment of advanced small-scale combined heat and power production

    Energy Technology Data Exchange (ETDEWEB)

    Spitzer, J. [Joanneum Research (Austria)

    1996-12-31

    To increase the share of renewable energy sources, bioenergy has to be used for electricity generation, preferably in combined heat and power (CHP) production systems, besides its traditional use in space heating. The need for small-scale, i.e. below 5 MW{sub el}, CHP production arises from the fact that a considerable portion of the available solid biofuels may not be transported over long distances for economic reasons and that in many cases the heat demand is below 10 MW{sub el} in district heating schemes in communities with less than 10 000 inhabitants. The available technical options have to be assessed with respect to performance, reliability and economy. Such an assessment has been performed in a study where the following options have been compared: Gasification - combustion engine or gas turbine; Combustion - steam turbine/engine; Combustion - hot air turbine; Combustion - Stirling engine. While conventional steam cycle systems are available and reliable they are generally not economical in the power range under consideration. Among the other systems, which are not yet commercially available, the Stirling engine system seems to be attractive in the power range below 500 kW{sub el} and the hot air system could close the gap to the steam cycle systems, i.e. cover the power range between 0.5 and 5.0 MW{sub el}. Gasification schemes seem less suitable: The power generation part (combustion engine and gas turbine) is well established for natural gas, with the combustion engine in the lower (<5 MW{sub el}) and the gas turbine in the higher (>5MW{sub el}) power range. However, the gas quality needed for the operation of a combustion engine requires expensive pre-treatment of the gas from wood gasification so that this scheme is less attractive for the power range under consideration. These conclusions lead to R and D efforts in Austria in two directions: Hot air turbine: A utility demonstration plant is under construction with a power of 1 600 kW{sub el

  5. Validation of the standalone implementation of the dynamic wake meandering model for power production

    DEFF Research Database (Denmark)

    Keck, Rolf-Erik Henrik Jussi

    2015-01-01

    be seen as an alternative for simulating the power production of a wind farm. The main advantage of the standalone DWM model is the ability to capture the key physics for wake dynamics such as the turbine specific induction, the build‐up of wake turbulence and wake deficit in the wind farm, and the effect...... is on the order of 5%. Copyright © 2014 John Wiley & Sons, Ltd....

  6. Assessing hydrogen production from wind and solar power with an LCA

    OpenAIRE

    Wulf, Christina; Kaltschmitt, Martin

    2016-01-01

    One option to reduce the environmental problems induced by the transport sector is its electrification with fuel cell electric vehicles (FCEV) as they produce locally only water emissions and are much quieter than conventional vehicles with an internal combustion engine. However, for a real environmental benefit of hydrogen not only its usage in a FCEV has to be cleaner. Also its production and distribution has to be taken into account. In particular solar and wind power are often discussed a...

  7. Analysis of environmental issues related to small-scale hydroelectric development IV: fish mortality resulting from turbine passage

    Energy Technology Data Exchange (ETDEWEB)

    Turbak, S. C.; Reichle, D. R.; Shriner, C. R.

    1981-01-01

    This document presents a state-of-the-art review of literature concerning turbine-related fish mortality. The review discusses conventional and, to a lesser degree, pumped-storage (reversible) hydroelectric facilities. Much of the research on conventional facilities discussed in this report deals with studies performed in the Pacific Northwest and covers both prototype and model studies. Research conducted on Kaplan and Francis turbines during the 1950s and 1960s has been extensively reviewed and is discussed. Very little work on turbine-related fish mortality has been undertaken with newer turbine designs developed for more modern small-scale hydropower facilities; however, one study on a bulb unit (Kaplan runner) has recently been released. In discussing turbine-related fish mortality at pumped-storage facilities, much of the literature relates to the Ludington Pumped Storage Power Plant. As such, it is used as the principal facility in discussing research concerning pumped storage.

  8. Modernisation of hydrogenerators. Upgrading of power plants for more efficiency; Modernisierung von Hydrogeneratoren. Kraftwerks-Upgrade fuer mehr Effizienz

    Energy Technology Data Exchange (ETDEWEB)

    Allen, John

    2012-07-01

    Ever since the construction of the first alternating current hydroelectric power plant with a performance of 12.5 kW in the year 1882, the number and performance of hydroelectric power plants had increased substantially. For example, the hydroelectric power plant at the Three Gorges Dam in the People's Republic of China has a total performance of 22,500 MW. The isolation systems of the hydrogenerators have a limited lifetime and have to be exchanged after fifty years usually. Under this aspect, the authors of the contribution under consideration reports on the upgrading of hydrogenerators for more efficiency.

  9. Integrating wind power in the (French) power system; Eolien et systeme de production d'electricite

    Energy Technology Data Exchange (ETDEWEB)

    Pellen, A

    2007-03-15

    RTE and EDF have no other technological option than to restrain the contribution of the French wind power fleet to base-load generation where it comes in direct competition with the nuclear power plants. The author aims to explain this situation and answer the following questions. Why the fossil fueled reactor fleet in France will not be affected by an evolution of the wind power capacity? Why, in France electric power generation-demand SYSTEM wind power cannot be a substitute for fossil fueled thermal units? (A.L.B.)

  10. Production Planning with Respect to Uncertainties. Simulator Based Production Planning of Average Sized Combined Heat and Power Production Plants; Produktionsplanering under osaekerhet. Simulatorbaserad produktionsplanering av medelstora kraftvaermeanlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Haeggstaahl, Daniel [Maelardalen Univ., Vaesteraas (Sweden); Dotzauer, Erik [AB Fortum, Stockholm (Sweden)

    2004-12-01

    Production planning in Combined Heat and Power (CHP) systems is considered. The focus is on development and use of mathematical models and methods. Different aspects on production planning are discussed, including weather and load predictions. Questions relevant on the different planning horizons are illuminated. The main purpose with short-term (one week) planning is to decide when to start and stop the production units, and to decide how to use the heat storage. The main conclusion from the outline of pros and cons of commercial planning software are that several are using Mixed Integer Programming (MIP). In that sense they are similar. Building a production planning model means that the planning problem is formulated as a mathematical optimization problem. The accuracy of the input data determines the practical detail level of the model. Two alternatives to the methods used in today's commercial programs are proposed: stochastic optimization and simulator-based optimization. The basic concepts of mathematical optimization are outlined. A simulator-based model for short-term planning is developed. The purpose is to minimize the production costs, depending on the heat demand in the district heating system, prices of electricity and fuels, emission taxes and fees, etc. The problem is simplified by not including any time-linking conditions. The process model is developed in IPSEpro, a heat and mass-balance software from SimTech Simulation Technology. TOMLAB, an optimization toolbox in MATLAB, is used as optimizer. Three different solvers are applied: glcFast, glcCluster and SNOPT. The link between TOMLAB and IPSEpro is accomplished using the Microsoft COM technology. MATLAB is the automation client and contains the control of IPSEpro and TOMLAB. The simulator-based model is applied to the CHP plant in Eskilstuna. Two days are chosen and analyzed. The optimized production is compared to the measured. A sensitivity analysis on how variations in outdoor

  11. A system for environmental monitoring of hydroelectric reservoirs in Brazil

    Directory of Open Access Journals (Sweden)

    Arley Souza

    2013-04-01

    Full Text Available Environmental monitoring of aquatic systems is an important tool to support policy makers and environmental managers’ decisions. Long-term, continuous collection of environmental data is fundamental to the understanding of an aquatic system. This paper aims to present the integrated system for environmental monitoring (SIMA, a long-term temporal series system with a web-based archive for limnological and meteorological data. The following environmental parameters are measured by SIMA: chlorophyll-a ( , water surface temperature (ºC, water column temperature by a thermistor string (ºC, turbidity (NTU, pH, dissolved oxygen concentration (mg L-1, electric conductivity (µS cm-1, wind speed (ms-1 and direction (º, relative humidity (%, shortwave radiation (Wm-2 and barometric pressure (hPa. The data were collected in a preprogrammed time interval (1 hour and were transmitted by satellite in quasi-real time for any user within 2500 km of the acquisition point. So far, 11 hydroelectric reservoirs are being monitored with the SIMA buoy. Basic statistics (mean and standard deviation and an example of the temporal series of some parameters were displayed at a database with web access. However, sensor and satellite problems occurred due to the high data acquisition frequency. Sensors problems occurred due to the environmental characteristics of each aquatic system. Water quality sensors rapidly degrade in acidic waters, rendering the collected data invalid. Data is also rendered invalid when sensors become infested with periphyton. Problems occur with the satellites’ reception of system data when satellites pass over the buoy antenna. However, the data transfer at some inland locations was not completed due to the satellite constellation position. Nevertheless, the integrated system of water quality and meteorological parameters is an important tool in understanding the aquatic system dynamic. It can also be used to create hydrodynamics models of

  12. WABASH RIVER INTEGRATED METHANOL AND POWER PRODUCTION FROM CLEAN COAL TECHNOLOGIES (IMPPCCT)

    Energy Technology Data Exchange (ETDEWEB)

    Gary Harmond; Albert Tsang

    2003-03-14

    The Wabash River Integrated Methanol and Power Production from Clean Coal Technologies (IMPPCCT) project is evaluating integrated electrical power generation and methanol production through clean coal technologies. The project is conducted by a multi-industry team lead by Gasification Engineering Corporation (GEC), a company of Global Energy Inc., and supported by Air Products and Chemicals, Inc., Dow Chemical Company, Dow Corning Corporation, Methanex Corporation, and Siemens Westinghouse Power Corporation. Three project phases are planned for execution over a three year period, including: (1) Feasibility study and conceptual design for an integrated demonstration facility, and for fence-line commercial embodiment plants (CEP) operated at Dow Chemical or Dow Corning chemical plant locations (2) Research, development, and testing to define any technology gaps or critical design and integration issues (3) Engineering design and financing plan to install an integrated commercial demonstration facility at the existing Wabash River Energy Limited (WREL) plant in West Terre Haute, Indiana. The WREL facility is a project selected and co-funded under the Round IV of the U.S. Department of Energy's (DOE's) Clean Coal Technology Program. In this project, coal and/or other solid fuel feedstocks are gasified in an oxygen-blown, entrained-flow gasifier with continuous slag removal and a dry particulate removal system. The resulting product synthesis gas is used to fuel a combustion turbine generator whose exhaust is integrated with a heat recovery steam generator to drive a refurbished steam turbine generator. The gasifier uses technology initially developed by The Dow Chemical Company (the Destec Gasification Process), and now offered commercially by Global Energy, Inc., as the E-GAS{trademark} technology. In a joint effort with the DOE, a Cooperative Agreement was awarded under the Early Entrance Coproduction Plant (EECP) solicitation. GEC and an Industrial

  13. Electronics Come of Age: A Taxonomy for Miscellaneous and LowPower Products

    Energy Technology Data Exchange (ETDEWEB)

    Nordman, Bruce; Sanchez, Marla C.

    2006-08-01

    Most energy end uses such as space conditioning or waterheating are apparently well-defined in what is included, and haveterminology that derives from the professionals who work in the relevantfield. The topic of miscellaneous consumption lacks such clarity forhistorical and practical reasons. As this end use grows in size andinterest for the energy community, the confusion and ambiguity around thetopic is an increasing barrier to progress. This paper providesdefinitions for key terms and concepts with the intent that that futurework can be more correctly and consistently reported and interpreted. Inaddition, it provides a taxonomy of product types and categories, whichcovers both residential and commercial miscellaneous consumption. A keyelement is identification of "electronics" as a distinct energy end use.Finally, products are identified as to whether they commonly have alow-power mode, and product types that have such modes within thetraditional end uses are also listed.

  14. Electric power monthly, September 1990. [Glossary included

    Energy Technology Data Exchange (ETDEWEB)

    1990-12-17

    The purpose of this report is to provide energy decision makers with accurate and timely information that may be used in forming various perspectives on electric issues. The power plants considered include coal, petroleum, natural gas, hydroelectric, and nuclear power plants. Data are presented for power generation, fuel consumption, fuel receipts and cost, sales of electricity, and unusual occurrences at power plants. Data are compared at the national, Census division, and state levels. 4 figs., 52 tabs. (CK)

  15. Study of mercury in by-products from a Dutch co-combustion power station.

    Science.gov (United States)

    Rallo, Manuela; Lopez-Anton, M Antonia; Meij, Ruud; Perry, Ron; Maroto-Valer, M Mercedes

    2010-02-15

    Fly ashes and gypsum are one of the main wastes produced in coal-fired power stations which may be sent to landfills for their disposal. In this work, leaching and speciation of mercury in fly ashes and gypsum from a modern co-combustion power plant equipped with a selective catalytic reduction (SCR) unit in the Netherlands were studied. The mercury leachable contents were checked against different regulations, including Dutch, German and the Council Directive 2003/33/EC. The speciation of mercury in coal combustion products is essential not only to determine the risk when the wastes are finally disposed but also to understand the behaviour of mercury during combustion and therefore to select the appropriate mercury removal technology. A temperature-programmed decomposition technique was used in order to identify and quantify which mercury species are associated with coal combustion products. The main mercury species identified in fly ash samples was mercury sulphate, whereas in the gypsum sample the mercury present was mercury chloride. The quantitative mercury results carried out using the thermal desorption method may be considered accurate. The results obtained show that fly ash and gypsum samples from this power plant can be acceptable at landfills as a non-hazardous waste.

  16. Power production from biomass II with special emphasis on gasification and pyrolysis R and DD

    Energy Technology Data Exchange (ETDEWEB)

    Sipilae, K.; Korhonen, M. [eds.] [VTT Energy, Espoo (Finland). Energy Production Technologies

    1996-12-31

    The Seminar on Power Production from Biomass II with special emphasis on gasification and pyrolysis R and DD, was organized by VTT Energy on 27 - 28 March 1995 in Espoo, Finland. All seminar speakers were invited in order to give a high-level overview of the achievements of biomass combustion, gasification and flash pyrolysis technologies. The sessions included presentations by all key industrial entrepreneurs in the field. The poster session was open to all groups interested. Globally bioenergy covers about 3 % of the primary energy consumption. Locally it has a significant role in many countries like in Finland, where bioenergy covers almost 15 % and peat 5 % of primary energy consumption. Today`s cost-effective heat and power production is based on industrial wood residues and spent cooking liquors in relatively large industrial units or municipal heating and power stations. Agricultural residues like straw and especially energy crops are becoming more interesting in co-utilization with other biomasses or fossil fuels. The seminar successfully displayed the status of present technologies as well as development targets for new gasification and flash pyrolysis technologies in the coming years. The many industrial participants showed that there are growing business possibilities in many countries all over the world. The proceedings include the most oral presentations given at the Seminar and also abstracts of poster presentations. (orig.)

  17. A dynamic model to assess tradeoffs in power production and riverine ecosystem protection.

    Science.gov (United States)

    Miara, Ariel; Vörösmarty, Charles J

    2013-06-01

    Major strategic planning decisions loom as society aims to balance energy security, economic development and environmental protection. To achieve such balance, decisions involving the so-called water-energy nexus must necessarily embrace a regional multi-power plant perspective. We present here the Thermoelectric Power & Thermal Pollution Model (TP2M), a simulation model that simultaneously quantifies thermal pollution of rivers and estimates efficiency losses in electricity generation as a result of fluctuating intake temperatures and river flows typically encountered across the temperate zone. We demonstrate the model's theoretical framework by carrying out sensitivity tests based on energy, physical and environmental settings. We simulate a series of five thermoelectric plants aligned along a hypothetical river, where we find that warm ambient temperatures, acting both as a physical constraint and as a trigger for regulatory limits on plant operations directly reduce electricity generation. As expected, environmental regulation aimed at reducing thermal loads at a single plant reduces power production at that plant, but ironically can improve the net electricity output from multiple plants when they are optimally co-managed. On the technology management side, high efficiency can be achieved through the use of natural gas combined cycle plants, which can raise the overall efficiency of the aging population of plants, including that of coal. Tradeoff analysis clearly shows the benefit of attaining such high efficiencies, in terms of both limiting thermal loads that preserve ecosystem services and increasing electricity production that benefits economic development.

  18. An assessment of using oil shale for power production in the Hashemite Kingdom of Jordan

    Energy Technology Data Exchange (ETDEWEB)

    Hill, L.J.; Holcomb, R.S.; Petrich, C.H.; Roop, R.D.

    1990-11-01

    This report addresses the oil shale-for-power-production option in Jordan. Under consideration are 20- and 50-MW demonstration units and a 400-MW, commercial-scale plant with, at the 400-MW scale, a mining operation capable of supplying 7.8 million tonnes per year of shale fuel and also capable of disposal of up to 6.1 million tonnes per year of wetted ash. The plant would be a direct combustion facility, burning crushed oil shale through use of circulating fluidized bed combustion technology. The report emphasizes four areas: (1) the need for power in Jordan, (2) environmental aspects of the proposed oil shale-for-power plant(s), (3) the engineering feasibility of using Jordan's oil shale in circulating fluidized bed combustion (CFBC) boiler, and (4) the economic feasibility of the proposed plant(s). A sensitivity study was conducted to determine the economic feasibility of the proposed plant(s) under different cost assumptions and revenue flows over the plant's lifetime. The sensitivity results are extended to include the major extra-firm benefits of the shale-for-power option: (1) foreign exchange savings from using domestic energy resources, (2) aggregate income effects of using Jordan's indigenous labor force, and (3) a higher level of energy security. 14 figs., 47 tabs.

  19. Impact of public policy uncertainty on renewable energy investment, Wind power and the production tax credit

    Energy Technology Data Exchange (ETDEWEB)

    Barradale, Merrill Jones [Department of Economics, Copenhagen Business School, Porcelaenshaven 16 A, DK-2000 Frederiksberg (Denmark)

    2010-12-15

    It is generally understood that the pattern of repeated expiration and short-term renewal of the federal production tax credit (PTC) causes a boom-bust cycle in wind power plant investment in the US. This on-off pattern is detrimental to the wind industry, since ramp-up and ramp-down costs are high, and players are deterred from making long-term investments. It is often assumed that the severe downturn in investment during 'off' years implies that wind power is unviable without the PTC. This assumption turns out to be unsubstantiated: this paper demonstrates that it is not the absence of the PTC that causes the investment downturn during 'off' years, but rather the uncertainty over its return. Specifically, it is the dynamic of power purchase agreement (PPA) negotiations in the face of PTC renewal uncertainty that drives investment volatility. With contract negotiations prevalent in the renewable energy industry, this finding suggests that reducing uncertainty is a crucial component of effective renewable energy policy. The PTC as currently structured is not the only means, existing or potential, for encouraging wind power investment. Using data from a survey of energy professionals, various policy instruments are compared in terms of their perceived stability for supporting long-term investment. (author)

  20. Novel anaerobic digestion process with sludge ozonation for economically feasible power production from biogas.

    Science.gov (United States)

    Komatsu, K; Yasui, H; Goel, R; Li, Y Y; Noike, T

    2011-01-01

    A novel process scheme was developed to achieve economically feasible energy recovery from anaerobic digestion. The new process scheme employs a hybrid configuration of mesophilic and thermophilic anaerobic digestion with sludge ozonation: the ozonated sludge is first degraded in a thermophilic digester and then further degraded in a mesophilic digester. In small-scale pilot experiments of the new process scheme, degradation of VSS improved by 3.5% over the control (mesophilic-only configuration) with 20% less ozone consumption. Moreover, biogas conversion also improved by 7.1% over the control. Selective enrichment of inorganic compounds during centrifugation produced a dewatered sludge cake with very low water content (59.4%). This low water content in the sludge cake improved its auto-thermal combustion potential during incineration and added to the overall energy savings. We conducted a case study to evaluate power generation from biogas for a municipal wastewater treatment plant with an average dry weather flow of 43,000 m3/d. Electricity production cost was 5.2 ¢/kWh for the advanced process with power generation, which is lower than the current market price of 7.2 ¢/kWh. The new anaerobic digestion scheme with power generation may reduce greenhouse gas emissions by about 1,000 t-CO(2)/year compared with the conventional process without power generation.

  1. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Third Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Third Quarter of 1983, the number of signed contracts and committed projects rose from 240 to 258, with a total estimated nominal capacity of these projects of 1,547 MW. Of this nominal capacity, about 416 MW is operational, and the balance is under contract for development. A map indicating the location of operational facilities under contract with PG and E is provided. Of the 258 signed contracts and committed projects, 83 were cogeneration, solid waste, or biomass projects with a potential of 779 MW. PG and E also had under active discussion 38 cogeneration projects that could generate a total of 797 MW to 848 MW, and 19 solid waste/biomass projects with a potential of 152 MW to 159 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as 3 solar projects under active discussion for 31 MW. Wind farm projects under contract number 21, with a generating capability of 528 MW. Also, discussions are being conducted with 17 wind farm projects, totaling 257 to 262 MW. There are 94 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 8 other small wind projects under active discussion. There are 50 hydroelectric projects with signed contracts and a potential of 112 MW, as well as 67 projects under active discussion for 175 MW. In addition, there are 31 hydroelectric projects, with a nominal capacity of 185 MW, that PG and E is planning to construct.

  2. Cogeneration and Small Power Production Quarterly Report to the California Public Utilities Commission Second Quarter 1983

    Energy Technology Data Exchange (ETDEWEB)

    None

    1983-01-01

    In the Second Quarter of 1983, the number of signed contracts and committed projects rose from 223 to 240, with a total estimated nominal capacity of these projects of 1,449 MW. Of this nominal capacity, about 361 MW is operational, and the balance is under contract for development. A map indicating the location of currently operating facilities is provided as Figure A. Of the 240 signed contracts and committed projects, 75 were cogeneration, solid waste, or biomass projects with a potential of 740 MW. PG and E also had under active discussion 32 cogeneration projects that could generate a total of 858 MW to 921 MW, and 10 solid waste/biomass projects with a potential of 113 MW to 121 MW. Two contracts have been signed with geothermal projects, capable of producing 83 MW. There are 6 solar projects with signed contracts and a potential of 36 MW, as well as another solar project under active discussion for 30 MW. Wind farm projects under contract number 19, with a generating capability of 471 MW. Also, discussions are being conducted with 12 wind farm projects, totaling 273 to 278 MW. There are 89 wind projects of 100 kW or less with signed contracts and a potential of almost 1 MW, as well as 10 other projects under active discussion. There are 47 hydroelectric projects with signed contracts and a potential of 110 MW, as well as 65 projects under active discussion for 175 MW. In addition, there are 30 hydroelectric projects, with a nominal capacity of 291 MW, that PG and E is constructing or planning to construct. Table A displays the above information. In tabular form, in Appendix A, are status reports of the projects as of June 30, 1983.

  3. Inventory of future power and heat production technologies; Inventering av framtidens el- och vaermeproduktionstekniker

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Clas [Vattenfall Research and Development AB, Stockholm (Sweden)

    2009-06-15

    's Water Framework Directive. Combined heat and power with a steam cycle is currently the most cost-effective alternative for biofuel based power production, and it also provides optimal utilization of fuel. The potential here is restricted mainly by the amount of available district heating demands. Gasification with gas turbines or gas engines ensures higher electricity efficiency for plants up to 50 MW, although costs are currently high. Wind power has become competitive owing to fast international expansion, although only on the strength of effective climate-related control measures and measures favouring renewable energy production. Its potential is restricted by the quantities that can be integrated into the electricity network, given that production is reliant on wind conditions. The possibility of storing electricity/energy could increase its usability. Wave power is a promising future alternative, although currently at an early stage of development. Its potential is restricted by the quantities that can be integrated into the electricity network, given that production is entirely reliant on waves. Combined plants with combined heat and power or district heating improve the overall utilization of fuel. Upgrading solid biofuels to pellets is currently a competitive option, and torrefication could prove an interesting option should there be a demand for prolonged storing ability and improved grindability. Pyrolysis oil can be burned in simple plants, and would also enable a cost-effective use of 'problematic' biofuels. Infrastructure and handling must however be adapted to the fact that pyrolysis oil is corrosive and unstable for storing. The competitiveness of all biofuel based automotive fuel alternatives studied pre-supposes that future control measures within the transport sector are equally effective as those currently in place. Under current conditions biogas is a competitive alternative to petrol, but its potential is curbed by the restricted

  4. From probabilistic forecasts to statistical scenarios of short-term wind power production

    DEFF Research Database (Denmark)

    Pinson, Pierre; Papaefthymiou, George; Klockl, Bernd

    2009-01-01

    Short-term (up to 2-3 days ahead) probabilistic forecasts of wind power provide forecast users with highly valuable information on the uncertainty of expected wind generation. Whatever the type of these probabilistic forecasts, they are produced on a per horizon basis, and hence do not inform...... on the development of the forecast uncertainty through forecast series. However, this additional information may be paramount for a large class of time-dependent and multistage decision-making problems, e.g. optimal operation of combined wind-storage systems or multiple-market trading with different gate closures....... This issue is addressed here by describing a method that permits the generation of statistical scenarios of short-term wind generation that accounts for both the interdependence structure of prediction errors and the predictive distributions of wind power production. The method is based on the conversion...

  5. Program THEK energy production units of average power and using thermal conversion of solar radiation

    Science.gov (United States)

    1978-01-01

    General studies undertaken by the C.N.R.S. in the field of solar power plants have generated the problem of building energy production units in the medium range of electrical power, in the order of 100 kW. Among the possible solutions, the principle of the use of distributed heliothermal converters has been selected as being, with the current status of things, the most advantageous solution. This principle consists of obtaining the conversion of concentrated radiation into heat by using a series of heliothermal conversion modules scattered over the ground; the produced heat is collected by a heat-carrying fluid circulating inside a thermal loop leading to a device for both regulation and storage.

  6. The Environmental Mitigation Potential of Photovoltaic-Powered Irrigation in the Production of South African Maize

    Directory of Open Access Journals (Sweden)

    Sarah Wettstein

    2017-09-01

    Full Text Available Agriculture is under pressure to reduce its environmental impact. The use of renewable energy sources has potential to decrease these impacts. Maize is one of the most significant crops in South Africa and approximately 241,000 hectares are irrigated. This irrigation is most commonly powered by grid electricity generated using coal. However, South Africa has high solar irradiation, which could be used to generate photovoltaic electricity. The aim of this study was to determine the environmental mitigation potential of replacing grid-powered irrigation in South African maize production with photovoltaic irrigation systems using Life Cycle Assessment. The study included the value chain of maize production from cultivation to storage. Replacing grid electricity with photovoltaic-generated electricity leads to a 34% reduction in the global warming potential of maize produced under irrigation, and—applied at a national level—could potentially reduce South Africa’s greenhouse gas emissions by 536,000 t CO2-eq. per year. Non-renewable energy demand, freshwater eutrophication, acidification, and particulate matter emissions are also significantly lowered. Replacing grid electricity with renewable energy in irrigation has been shown to be an effective means of reducing the environmental impacts associated with South African maize production.

  7. High-Efficiency Food Production in a Renewable Energy Based Micro-Grid Power System

    Science.gov (United States)

    Bubenheim, David; Meiners, Dennis

    2016-01-01

    Controlled Environment Agriculture (CEA) systems can be used to produce high-quality, desirable food year round, and the fresh produce can positively contribute to the health and well being of residents in communities with difficult supply logistics. While CEA has many positive outcomes for a remote community, the associated high electric demands have prohibited widespread implementation in what is typically already a fully subscribed power generation and distribution system. Recent advances in CEA technologies as well as renewable power generation, storage, and micro-grid management are increasing system efficiency and expanding the possibilities for enhancing community supporting infrastructure without increasing demands for outside supplied fuels. We will present examples of how new lighting, nutrient delivery, and energy management and control systems can enable significant increases in food production efficiency while maintaining high yields in CEA. Examples from Alaskan communities where initial incorporation of renewable power generation, energy storage and grid management techniques have already reduced diesel fuel consumption for electric generation by more than 40% and expanded grid capacity will be presented. We will discuss how renewable power generation, efficient grid management to extract maximum community service per kW, and novel energy storage approaches can expand the food production, water supply, waste treatment, sanitation and other community support services without traditional increases of consumable fuels supplied from outside the community. These capabilities offer communities with a range of choices to enhance their communities. The examples represent a synergy of technology advancement efforts to develop sustainable community support systems for future space-based human habitats and practical implementation of infrastructure components to increase efficiency and enhance health and well being in remote communities today and tomorrow.

  8. Power Relations and Legitimacy of Organic Products Sold at Fairs in Rio de Janeiro: Critical Analysis in the Light of Bourdieu Symbolic Power theory and of Mintzberg Power School of Strategy.

    Directory of Open Access Journals (Sweden)

    Isabelle Martelleto Silberman

    2015-12-01

    Full Text Available This article analyses social relations and power construction between different actors belonging to the universe of organic fairs in the city of Rio de Janeiro, based on concepts of organizational theories from Bourdieu Symbolic Power and Mintzberg, Ahlstrand and Lampel. Power School of Strategy. We aim to understand how human interactions (formation of coalitions and power networks or groups of interests and the symbolic system present in the fairs affect the legitimacy of the products sold there. Besides the bibliographic research, data collection included interviews conducted with farmers and coordinators of the two fairs and with a representative of an entity responsible for organic conformity evaluation, between June and September 2011. The results suggest that producers and entities responsible for control and evaluation of organic conformity, organized in the forms of coalitions and power networks, can influence the legitimacy of the products sold in the fairs analyzed, due to the symbolic power they exercise over the environment.

  9. Ozone Production With Dielectric Barrier Discharge: Effects of Power Source and Humidity

    KAUST Repository

    Zhang, Xuming

    2016-08-24

    Ozone synthesis in air dielectric barrier discharge (DBD) was studied with an emphasis on the effects of power sources and humidity. Discharge characteristics were investigated to understand the physical properties of plasma and corresponding system performance. It was found that 10-ns pulsed DBD produced a homogeneous discharge mode, while ac DBD yielded an inhomogeneous pattern with many microdischarge channels. At a similar level of the energy density (ED), decreasing the flowrate is more effective in the production of ozone for the cases of the ac DBD, while increased voltage is more effective for the pulsed DBD. Note that the maximum ozone production efficiency (110 g/kWh) was achieved with the pulsed DBD. At the ED of ∼ 85 J/L, the ozone concentrations with dry air were over three times higher than those with the relative humidity of 100% for both the ac DBD and pulsed DBD cases. A numerical simulation was conducted using a global model to understand a detailed chemical role of water vapor to ozone production. It was found HO and OH radicals from water vapor significantly consumed O atoms, resulting in a reduction in ozone production. The global model qualitatively captured the experimental trends, providing further evidence that the primary effect of humidity on ozone production is chemical in nature.

  10. Modeling Hydrodynamic Changes Due to Marine Hydrokinetic Power Production: Community Outreach and Education

    Science.gov (United States)

    James, S. C.; Jones, C.; Roberts, J.

    2013-12-01

    Power generation with marine hydrokinetic (MHK) turbines is receiving growing global interest. Because of reasonable investment, maintenance, reliability, and environmental friendliness, this technology can contribute to national (and global) energy markets and is worthy of research investment. Furthermore, in remote areas, small-scale MHK energy from river, tidal, or ocean currents can provide a local power supply. The power-generating capacity of MHK turbines will depend, among other factors, upon the turbine type and number and the local flow velocities. There is an urgent need for deployment of practical, accessible tools and techniques to help the industry optimize MHK array layouts while establishing best sitting and design practices that minimize environmental impacts. Sandia National Laboratories (SNL) has modified the open-source flow and transport Environmental Fluid Dynamics Code (EFDC) to include the capability of simulating the effects of MHK power production. Upon removing energy (momentum) from the system, changes to the local and far-field flow dynamics can be estimated (e.g., flow speeds, tidal ranges, flushing rates, etc.). The effects of these changes on sediment dynamics and water quality can also be simulated using this model. Moreover, the model can be used to optimize MHK array layout to maximize power capture and minimize environmental impacts. Both a self-paced tutorial and in-depth training course have been developed as part of an outreach program to train academics, technology developers, and regulators in the use and application of this software. This work outlines SNL's outreach efforts using this modeling framework as applied to two specific sites where MHK turbines have been deployed.

  11. Measurement and Comparison of Reliability Performance of Photovoltaic Power Optimizers for Energy Production

    Directory of Open Access Journals (Sweden)

    Catelani Marcantonio

    2015-03-01

    Full Text Available Photovoltaic (PV power optimizers are introduced in PV systems to improve their energetic productivity in presence of mismatching phenomena and not uniform operating conditions. Commercially available converters are characterized by different DC-DC topologies. A promising one is the boost topology with its different versions. It is characterized by its circuital simplicity, few devices and high efficiency values - necessary features for a Distributed Maximum Power Point Tracking (DMPPT converter. PV power optimizer designs represent a challenging task since they operate in continuously changing operating conditions which strongly influence electronic component properties and thus the performance of complete converters. An aspect to carefully analyze in such applications is the thermal factor. In this paper, a necessity to have a suitable temperature monitoring system to avoid dangerous conditions is underlined In addition, another important requirement for a PV power optimizer is its reliability, since it can suggest a useful information on its diagnostic aspects, maintenance and investments. In fact, a reliable device requires less maintenance services, also improving the economic aspect. The evaluation of the electronic system reliability can be carried out using different reliability prediction models. In this paper, reliability indices, such as the Mean Time Between Failure (MTBF or the Failure Rate of a Diode Rectification (DR boost, are calculated using the evaluation of the Military Handbook 217F and Siemens SN29500 prediction models. With the reliability prediction results it has been possible to identify the most critical components of a DMPPT converter and a measurement setup has been developed in order to monitor the component stress level on the temperature, power, voltage, current, and energy in the DMPPT design phase avoiding the occurrence of a failure that might decrease the service life of the equipment.

  12. Utilization of low-temperature heat sources for heat and power production

    DEFF Research Database (Denmark)

    Haglind, Fredrik; Elmegaard, Brian

    2014-01-01

    Low-temperature heat sources are available in many applications, ranging from waste heat from marine diesel engines, industries and refrigeration plants to biomass, geothermal and solar heat sources. There is a great potential for enhancing the utilization of these heat sources by novel.......Both power production and heat pumps may benefit from the development as both technologies utilize a heat source. This makes it possible to cover the complete temperature range of low temperature sources. The development may contribute to significantly lower energy consumption in Danish industry and shipping...

  13. Inventory of future power and heat production technologies; Inventering av framtidens el- och vaermeproduktionstekniker

    Energy Technology Data Exchange (ETDEWEB)

    Ekstroem, Clas (Vattenfall Research and Development AB, Stockholm (Sweden))

    2008-12-15

    's Water Framework Directive. Combined heat and power with a steam cycle is currently the most cost-effective alternative for biofuel based power production, and it also provides optimal utilization of fuel. The potential here is restricted mainly by the amount of available district heating demands. Gasification with gas turbines or gas engines ensures higher electricity efficiency for plants up to 50 MW, although costs are currently high. Wind power has become competitive owing to fast international expansion, although only on the strength of effective climate-related control measures and measures favouring renewable energy production. Its potential is restricted by the quantities that can be integrated into the electricity network, given that production is reliant on wind conditions. The possibility of storing electricity/energy could increase its usability. Wave power is a promising future alternative, although currently at an early stage of development. Its potential is restricted by the quantities that can be integrated into the electricity network, given that production is entirely reliant on waves. Combined plants with combined heat and power or district heating improve the overall utilization of fuel. Upgrading solid biofuels to pellets is currently a competitive option, and torrefication could prove an interesting option should there be a demand for prolonged storing ability and improved grindability. Pyrolysis oil can be burned in simple plants, and would also enable a cost-effective use of 'problematic' biofuels. Infrastructure and handling must however be adapted to the fact that pyrolysis oil is corrosive and unstable for storing. The competitiveness of all biofuel based automotive fuel alternatives studied pre-supposes that future control measures within the transport sector are equally effective as those currently in place. Under current conditions biogas is a competitive alternative to petrol, but its potential is curbed by the restricted

  14. THERMAL POWER LOSS COMPENSATION IN THE PRODUCTION OF COOKED AND DRIED GRAINS WITH HEAT PUMPS USING

    Directory of Open Access Journals (Sweden)

    S. A. Shevtsov

    2015-01-01

    Full Text Available Using scientificand practical experience and analysis of recent innovative activity on modernization of food concentrates production, a new variant of the energy-efficient processing of cereal crops using superheated steam and direct involvement in the cooking and drying process waste energy using the vapor compression heat pump was suggested. A method for production of cereal concentrates, which is realized using microprocessor control of technological parameters. According to the information on the processes of cereals washing, cooking, drying and cooling microprocessor provides regime parameters control under the restrictions due to both yield of cooked and dried cereal of high quality and economic feasibility. At the same time the amount of moisture is continuously determined in the recirculation loop formed by the evaporation from the cereals in the drying process. To implement the proposed method of cooked and dried cereals production it is offered to use refrigerationand compressor unit operating in a heat pump mode. The refrigerant to be used is khladon 12V1 CF2ClBr with a boiling point in the evaporator of 4°C and the condensing temperature of 153.7 °C. The use of the heat pump in the heat supply system of cooked and dried cereals production instead of electric heaters will reduce power costs by 1.72 times. The proposed method for the production and control of technological parameters in the field of the product acceptable technological properties will provide high quality cooked and dried cereals; an increase in thermal efficiency by making full use of the waste heat of superheated steam; the reduction of specific energy consumption by 25-30 %; the creation of waste-free and environmentally friendly technologies for cereal production.

  15. Potential Coastal Pumped Hydroelectric Energy Storage Locations Identified using GIS-based Topographic Analysis

    Science.gov (United States)

    Parsons, R.; Barnhart, C. J.; Benson, S. M.

    2013-12-01

    Large-scale electrical energy storage could accommodate variable, weather dependent energy resources such as wind and solar. Pumped hydroelectric energy storage (PHS) and compressed energy storage area (CAES) have life cycle energy and financial costs that are an order of magnitude lower than conventional electrochemical storage technologies. However PHS and CAES storage technologies require specific geologic conditions. Conventional PHS requires an upper and lower reservoir separated by at least 100 m of head, but no more than 10 km in horizontal distance. Conventional PHS also impacts fresh water supplies, riparian ecosystems, and hydrologic environments. A PHS facility that uses the ocean as the lower reservoir benefits from a smaller footprint, minimal freshwater impact, and the potential to be located near off shore wind resources and population centers. Although technologically nascent, today one coastal PHS facility exists. The storage potential for coastal PHS is unknown. Can coastal PHS play a significant role in augmenting future power grids with a high faction of renewable energy supply? In this study we employ GIS-based topographic analysis to quantify the coastal PHS potential of several geographic locations, including California, Chile and Peru. We developed automated techniques that seek local topographic minima in 90 m spatial resolution shuttle radar topography mission (SRTM) digital elevation models (DEM) that satisfy the following criteria conducive to PHS: within 10 km from the sea; minimum elevation 150 m; maximum elevation 1000 m. Preliminary results suggest the global potential for coastal PHS could be very significant. For example, in northern Chile we have identified over 60 locations that satisfy the above criteria. Two of these locations could store over 10 million cubic meters of water or several GWh of energy. We plan to report a global database of candidate coastal PHS locations and to estimate their energy storage capacity.

  16. A critical view on the eco-friendliness of small hydroelectric installations.

    Science.gov (United States)

    Premalatha, M; Tabassum-Abbasi; Abbasi, Tasneem; Abbasi, S A

    2014-05-15

    Renewable energy sources are widely perceived as 'clean', 'green', and 'inexhaustible'. In recent years the spectre of global warming and ocean acidification, which has been primarily attributed to fossil fuel burning, has brought renewable energy at the forefront of most climate change mitigation strategies. There is strong advocacy for large-scale substitution of conventional energy sources with the renewables on the premise that such a move would substantially reduce environmental degradation and global warming. These sentiments are being echoed by scientists and policy makers as well as environmental activists all over the world. 'Small hydro', which generally represents hydroelectric power projects of capacities 25 MW or lower, is one of the renewable energy options which is believed to be clean and sustainable even as its bigger version, large hydro, is known to cause several strongly adverse environmental impacts. This paper brings out that the prevailing perception of 'eco-friendliness' of small hydro is mainly due to the fact that it has only been used to a very small extent so far. But once it is deployed at a scale comparable to fossil fuel use, the resulting impacts would be quite substantially adverse. The purpose is not to denegrade small hydro, less so to advocate use of fossil fuels. It, rather, is to bring home the point that a much more realistic and elaborate assessment of the likely direct as well as indirect impacts of extensive utilization of this energy source than has been done hitherto is necessary. Copyright © 2013 Elsevier B.V. All rights reserved.

  17. Overview of Maximum Power Point Tracking Techniques for Photovoltaic Energy Production Systems

    DEFF Research Database (Denmark)

    Koutroulis, Eftichios; Blaabjerg, Frede

    2017-01-01

    A substantial growth of the installed photovoltaic (PV) systems capacity has occurred around the world during the last decade, thus enhancing the availability of electric energy in an environmentally friendly way. The maximum power point tracking (MPPT) technique enables to maximize the energy...... production of PV sources, despite the stochastically varying solar irradiation and ambient temperature conditions. Thereby, the overall efficiency of the PV energy production system is increased. Numerous techniques have been presented during the last decades for implementing the MPPT process in a PV system....... This chapter provides an overview of the operating principles of these techniques, which are suited for either uniform or nonuniform solar irradiation conditions. The operational characteristics and implementation requirements of these MPPT methods are also analyzed in order to demonstrate their performance...

  18. Electrical power production from low-grade waste heat using a thermally regenerative ethylenediamine battery

    Science.gov (United States)

    Rahimi, Mohammad; D'Angelo, Adriana; Gorski, Christopher A.; Scialdone, Onofrio; Logan, Bruce E.

    2017-05-01

    Thermally regenerative ammonia-based batteries (TRABs) have been developed to harvest low-grade waste heat as electricity. To improve the power production and anodic coulombic efficiency, the use of ethylenediamine as an alternative ligand to ammonia was explored here. The power density of the ethylenediamine-based battery (TRENB) was 85 ± 3 W m-2-electrode area with 2 M ethylenediamine, and 119 ± 4 W m-2 with 3 M ethylenediamine. This power density was 68% higher than that of TRAB. The energy density was 478 Wh m-3-anolyte, which was ∼50% higher than that produced by TRAB. The anodic coulombic efficiency of the TRENB was 77 ± 2%, which was more than twice that obtained using ammonia in a TRAB (35%). The higher anodic efficiency reduced the difference between the anode dissolution and cathode deposition rates, resulting in a process more suitable for closed loop operation. The thermal-electric efficiency based on ethylenediamine separation using waste heat was estimated to be 0.52%, which was lower than that of TRAB (0.86%), mainly due to the more complex separation process. However, this energy recovery could likely be improved through optimization of the ethylenediamine separation process.

  19. Recycled tire crumb rubber anodes for sustainable power production in microbial fuel cells

    Science.gov (United States)

    Wang, Heming; Davidson, Matthew; Zuo, Yi; Ren, Zhiyong

    One of the greatest challenges facing microbial fuel cells (MFCs) in large scale applications is the high cost of electrode material. We demonstrate here that recycled tire crumb rubber coated with graphite paint can be used instead of fine carbon materials as the MFC anode. The tire particles showed satisfactory conductivity after 2-4 layers of coating. The specific surface area of the coated rubber was over an order of magnitude greater than similar sized graphite granules. Power production in single chamber tire-anode air-cathode MFCs reached a maximum power density of 421 mW m -2, with a coulombic efficiency (CE) of 25.1%. The control graphite granule MFC achieved higher power density (528 mW m -2) but lower CE (15.6%). The light weight of tire particle could reduce clogging and maintenance cost but posts challenges in conductive connection. The use of recycled material as the MFC anodes brings a new perspective to MFC design and application and carries significant economic and environmental benefit potentials.

  20. Design of robust hollow fiber membranes with high power density for osmotic energy production

    KAUST Repository

    Zhang, Sui

    2014-04-01

    This study highlights the design strategy of highly asymmetric hollow fiber membranes that possess both characteristics of high flux and high mechanical strength to effectively reap the osmotic energy from seawater brine with an ultrahigh power density. An advanced co-extrusion technology was employed to fabricate the polyethersulfone (PES) hollow fiber supports with diversified structures from macrovoid to sponge-like. The microstructure of the supports is found critical for the stability and water permeability of the thin film composite (TFC) membranes. A high porosity in the porous layer is needed to reduce internal concentration polarization, while a thick and relatively dense skin layer underneath the TFC layer is required to maintain good mechanical stability and stress dissipation. The pore size of the supporting layer underneath the TFC layer must be small with a narrow pore size distribution to ensure the formation of a less-defective, highly permeable and mechanically stable TFC layer. The newly developed hollow fiber comprising high asymmetry, high porosity, and a thick skin layer with a small and narrow pore size distribution underneath the TFC layer produces a maximum power density of 24.3W/m2 at 20.0bar by using 1M NaCl as the concentrated brine and deionized (DI) water as the feed. The proposed design strategy for ultrahigh power density membranes clearly advances the osmotic energy production close to commercialization with a quite cost-effective and practicable approach. © 2013 Elsevier B.V.