  1. Electricity production in a hydro system with a reservoir constraint

    Energy Technology Data Exchange (ETDEWEB)

    Mathiesen, Lars; Skaar, Jostein; Soergard, Lars

    2011-02-15

    The purpose of this article is to analyze how market power may affect the allocation of production between seasons (summer and winter) in a hydro power system with reservoir constraints and inflow uncertainty. We find that even without market power the price in the summer season may be lower than the expected price in the winter season. Market power may in some situations lead to higher sales and lower price in summer than the competitive outcome and in other situations to the opposite result. Furthermore, market power may lead to a smaller price difference between summer and winter than in a competitive market. (Author)

  2. Long-term continuous administration of a hydro-ethanolic extract of ...

    African Journals Online (AJOL)

    Long-term continuous administration of a hydro-ethanolic extract of Synedrella ... Ghana, P.O Box LG 43, Legon, Accra, Ghana 2Department of Animal Experimentation, Noguchi Memorial. Institute for ..... short-or long-term administration.

  3. Hierarchical clustering using correlation metric and spatial continuity constraint

    Science.gov (United States)

    Stork, Christopher L.; Brewer, Luke N.

    2012-10-02

    Large data sets are analyzed by hierarchical clustering using correlation as a similarity measure. This provides results that are superior to those obtained using a Euclidean distance similarity measure. A spatial continuity constraint may be applied in hierarchical clustering analysis of images.

  4. Mathematical constraint on functions with continuous second partial derivatives

    International Nuclear Information System (INIS)

    Franson, J D

    2012-01-01

    A new integral identity for functions with continuous second partial derivatives is derived. It is shown that the value of any function f(r, t) at position r and time t is completely determined by its previous values at all other locations r′ and retarded times t′ ⩽ t, provided that the function vanishes at infinity and has continuous second partial derivatives. Functions of this kind occur in many areas of physics and it seems somewhat surprising that they are constrained in this way. (paper)

  5. Constraints on dike propagation from continuous GPS measurements

    Science.gov (United States)

    Segall, P.; Cervelli, Peter; Owen, S.; Lisowski, M.; Miklius, Asta

    2001-01-01

    The January 1997 East Rift Zone eruption on Kilauea volcano, Hawaii, occurred within a network of continuous Global Positioning System (GPS) receivers. The GPS measurements reveal the temporal history of deformation during dike intrusion, beginning ??? 8 hours prior to the onset of the eruption. The dike volume as a function of time, estimated from the GPS data using elastic Green's functions for a homogeneous half-space, shows that only two thirds of the final dike volume accumulated prior to the eruption and the rate of volume change decreased with time. These observations are inconsistent with simple models of dike propagation, which predict accelerating dike volume up to the time of the eruption and little or no change thereafter. Deflationary tilt changes at Kilauea summit mirror the inferred dike volume history, suggesting that the rate of dike propagation is limited by flow of magma into the dike. A simple, lumped parameter model of a coupled dike magma chamber system shows that the tendency for a dike to end in an eruption (rather than intrusion) is favored by high initial dike pressures, compressional stress states, large, compressible magma reservoirs, and highly conductive conduits linking the dike and source reservoirs. Comparison of model predictions to the observed dike volume history, the ratio of erupted to intruded magma, and the deflationary history of the summit magma chamber suggest that most of the magma supplied to the growing dike came from sources near to the eruption through highly conductive conduits. Interpretation is complicated by the presence of multiple source reservoirs, magma vesiculation and cooling, as well as spatial variations in dike-normal stress. Reinflation of the summit magma chamber following the eruption was measured by GPS and accompanied a rise in the level of the Pu'u O'o lava lake. For a spheroidal chamber these data imply a summit magma chamber volume of ??? 20 km3, consistent with recent estimates from seismic

  6. Expanding exports, increasing smog : Ontario Power Generation's and Hydro One's strategies to continue coal-fired electricity generation in Ontario

    International Nuclear Information System (INIS)

    Gibbons, J.

    2002-06-01

    The production of coal-fired electricity increased by approximately 150 per cent in Ontario between 1995 and 2000. As a result, the smog-causing emissions generated by the five coal-fired power plants operated by Ontario Power Generation caused an increase in smog and worsened air quality in the province as well as affecting air quality as far afield as the Atlantic provinces. Between 2002 and 2005, it is expected that the Pickering and Bruce nuclear plants will be returned to service, making the electricity generated by the coal plants surplus to Ontario's needs. Increasing this surplus are the planned natural gas generating stations. Ontario Power Generation is planning on using this surplus to export it to the United States rather than phasing out its reliance on coal. The increase in exports to the United States Northeast and Midwest is planned with Hydro One, already busy increasing its transmission capacity to the United States by 1,000 megawatt (MW). This plan involves laying 975 MW submarine cable from the Nanticoke Generating Station (operated by Ontario Power Generation) under Lake Erie to Pennsylvania, Ohio, or both states. At the moment, the exports are constrained by the government emissions limits imposed by the Ontario government on sulphur dioxide and nitrogen oxides. This constraint could be removed if Ontario Power Generation decides to pay further for pollution controls for sulphur dioxide and nitrogen oxides at its coal stations. Unfortunately, increasing the exports would also result in emissions increases for 28 other uncapped pollutants such as lead, mercury and arsenic. The author recommended that the Ontario government ban non-emergency coal-fired electricity exports to improve air quality in the province. refs., 8 figs

  7. Mercury Emission Measurement in Coal-Fired Boilers by Continuous Mercury Monitor and Ontario Hydro Method

    Science.gov (United States)

    Zhu, Yanqun; Zhou, Jinsong; He, Sheng; Cai, Xiaoshu; Hu, Changxin; Zheng, Jianming; Zhang, Le; Luo, Zhongyang; Cen, Kefa

    2007-06-01

    The mercury emission control approach attaches more importance. The accurate measurement of mercury speciation is a first step. Because OH method (accepted method) can't provide the real-time data and 2-week time for results attained, it's high time to seek on line mercury continuous emission monitors(Hg-CEM). Firstly, the gaseous elemental and oxidized mercury were conducted to measure using OH and CEM method under normal operation conditions of PC boiler after ESP, the results between two methods show good consistency. Secondly, through ESP, gaseous oxidized mercury decrease a little and particulate mercury reduce a little bit, but the elemental mercury is just the opposite. Besides, the WFGD system achieved to gaseous oxidized mercury removal of 53.4%, gaseous overall mercury and elemental mercury are 37.1% and 22.1%, respectively.

  8. Real-time aircraft continuous descent trajectory optimization with ATC time constraints using direct collocation methods.

    OpenAIRE

    Verhoeven, Ronald; Dalmau Codina, Ramon; Prats Menéndez, Xavier; de Gelder, Nico

    2014-01-01

    1 Abstract In this paper an initial implementation of a real - time aircraft trajectory optimization algorithm is presented . The aircraft trajectory for descent and approach is computed for minimum use of thrust and speed brake in support of a “green” continuous descent and approach flight operation, while complying with ATC time constraints for maintaining runway throughput and co...

  9. The capability and constraint model of recoverability: An integrated theory of continuity planning.

    Science.gov (United States)

    Lindstedt, David

    2017-01-01

    While there are best practices, good practices, regulations and standards for continuity planning, there is no single model to collate and sort their various recommended activities. To address this deficit, this paper presents the capability and constraint model of recoverability - a new model to provide an integrated foundation for business continuity planning. The model is non-linear in both construct and practice, thus allowing practitioners to remain adaptive in its application. The paper presents each facet of the model, outlines the model's use in both theory and practice, suggests a subsequent approach that arises from the model, and discusses some possible ramifications to the industry.

  10. The roles of constraint-based and dedication-based influences on user's continued online shopping behavior.

    Science.gov (United States)

    Chang, Su-Chao; Chou, Chi-Min

    2012-11-01

    The objective of this study was to determine empirically the role of constraint-based and dedication-based influences as drivers of the intention to continue using online shopping websites. Constraint-based influences consist of two variables: trust and perceived switching costs. Dedication-based influences consist of three variables: satisfaction, perceived usefulness, and trust. The current results indicate that both constraint-based and dedication-based influences are important drivers of the intention to continue using online shopping websites. The data also shows that trust has the strongest total effect on online shoppers' intention to continue using online shopping websites. In addition, the results indicate that the antecedents of constraint-based influences, technical bonds (e.g., perceived operational competence and perceived website interactivity) and social bonds (e.g., perceived relationship investment, community building, and intimacy) have indirect positive effects on the intention to continue using online shopping websites. Based on these findings, this research suggests that online shopping websites should build constraint-based and dedication-based influences to enhance user's continued online shopping behaviors simultaneously.

  11. Asymmetric continuous-time neural networks without local traps for solving constraint satisfaction problems.

    Directory of Open Access Journals (Sweden)

    Botond Molnár

    Full Text Available There has been a long history of using neural networks for combinatorial optimization and constraint satisfaction problems. Symmetric Hopfield networks and similar approaches use steepest descent dynamics, and they always converge to the closest local minimum of the energy landscape. For finding global minima additional parameter-sensitive techniques are used, such as classical simulated annealing or the so-called chaotic simulated annealing, which induces chaotic dynamics by addition of extra terms to the energy landscape. Here we show that asymmetric continuous-time neural networks can solve constraint satisfaction problems without getting trapped in non-solution attractors. We concentrate on a model solving Boolean satisfiability (k-SAT, which is a quintessential NP-complete problem. There is a one-to-one correspondence between the stable fixed points of the neural network and the k-SAT solutions and we present numerical evidence that limit cycles may also be avoided by appropriately choosing the parameters of the model. This optimal parameter region is fairly independent of the size and hardness of instances, this way parameters can be chosen independently of the properties of problems and no tuning is required during the dynamical process. The model is similar to cellular neural networks already used in CNN computers. On an analog device solving a SAT problem would take a single operation: the connection weights are determined by the k-SAT instance and starting from any initial condition the system searches until finding a solution. In this new approach transient chaotic behavior appears as a natural consequence of optimization hardness and not as an externally induced effect.

  12. Small hydro

    International Nuclear Information System (INIS)

    Bennett, K.; Tung, T.

    1995-01-01

    A small hydro plant in Canada is defined as any project between 1 MW and 15 MW but the international standard is 10 MW. The global market for small hydro development was considered good. There are some 1000 to 2000 MW of generating capacity being added each year. In Canada, growth potential is considered small, primarily in remote areas, but significant growth is anticipated in Eastern Europe, Africa and Asia. Canada with its expertise in engineering, manufacturing and development is considered to have a good chance to take advantage of these growing markets

  13. Hydro adventurers

    International Nuclear Information System (INIS)

    Wood, Janet

    2000-01-01

    Some of the changes brought about by privatisation of the hydroelectric power industry in Ecuador are discussed. At present, about 25% of the population has no electricity supply; in the remaining areas demand is increasing. Seven new facilities are presently under discussion and these are described briefly. A plant at Abitugua is to be developed as a 'merchant plant' and the meaning and implications of this are described in detail. The present financing programme for Abituaga and an alternative financing programme are detailed. By 2010, some 40% of Ecuador's electricity is expected to come from hydro

  14. A mixed integer programming model for a continuous move transportation problem with service constraints

    Directory of Open Access Journals (Sweden)

    J. Fabian Lopez

    2010-01-01

    Full Text Available We consider a Pickup and Delivery Vehicle Routing Problem (PDP commonly encountered in real-world logistics operations. The problem involves a set of practical complications that have received little attention in the vehicle routing literature. In this problem, there are multiple vehicle types available to cover a set of pickup and delivery requests, each of which has pickup time windows and delivery time windows. Transportation orders and vehicle types must satisfy a set of compatibility constraints that specify which orders cannot be covered by which vehicle types. In addition we include some dock service capacity constraints as is required on common real world operations. This problem requires to be attended on large scale instances (orders ≥ 500, (vehicles ≥ 150. As a generalization of the traveling salesman problem, clearly this problem is NP-hard. The exact algorithms are too slow for large scale instances. The PDP-TWDS is both a packing problem (assign order to vehicles, and a routing problem (find the best route for each vehicle. We propose to solve the problem in three stages. The first stage constructs initials solutions at aggregate level relaxing some constraints on the original problem. The other two stages imposes time windows and dock service constraints. Our results are favorable finding good quality solutions in relatively short computational times.

  15. A solid criterion based on strict LMI without invoking equality constraint for stabilization of continuous singular systems.

    Science.gov (United States)

    Zhang, Xuefeng; Chen, YangQuan

    2017-11-01

    The paper considers the stabilization issue of linear continuous singular systems by dealing with strict linear matrix inequalities (LMIs) without invoking equality constraint and proposes a complete and effective solved LMIs formulation. The criterion is necessary and sufficient condition and can be directly solved the feasible solutions with LMI toolbox and is much more tractable and reliable in numerical simulation than existing results, which involve positive semi-definite LMIs with equality constraints. The most important property of the criterion proposed in the paper is that it can overcome the drawbacks of the invalidity caused by the singularity of Ω=PE T +SQ for stabilization of singular systems. Two counterexamples are presented to avoid the disadvantages of the existing condition of stabilization of continuous singular systems. Copyright © 2017 ISA. Published by Elsevier Ltd. All rights reserved.

  16. Remote micro hydro

    Energy Technology Data Exchange (ETDEWEB)

    1985-03-01

    The micro-hydro project, built on a small tributary of Cowley Creek, near Whitehorse, Yukon, is an important step in the development of alternative energy sources and in conserving expensive diesel fuel. In addition to demonstrating the technical aspects of harnessing water power, the project paved the way for easier regulatory procedures. The power will be generated by a 9 meter head and a 6 inch crossflow turbine. The 36 V DC power will be stored in three 12 V batteries and converted to ac on demand by a 3,800 watt inverter. The system will produce 1.6 kW or 14,016 kWh per year with a firm flow of 1.26 cfs. This is sufficient to supply electricity for household needs and a wood working shop. The project is expected to cost about $18,000 and is more economical than tying into the present grid system, or continuing to use a gasoline generator. An environmental study determined that any impact of the project on the stream would be negligible. It is expected that no other water users will be affected by the project. This pilot project in micro-hydro applications will serve as a good indicator of the viability of this form of alternate energy in the Yukon. The calculations comparing the micro-hydro and grid system indicate that the mico-hydro system is a viable source of inflation-proof power. Higher heads and larger flow resulting in ac generation in excess of 10 kW would yield much better returns than this project. 3 tabs.

  17. The Relaxation of Some Classes of Variational Integrals with Pointwise Continuous-Type Gradient Constraints

    International Nuclear Information System (INIS)

    De Arcangelis, Riccardo; Zappale, Elvira

    2005-01-01

    Relaxation problems for a functional are analyzed. Identity and integral representation results are proved under continuity-type assumptions, together with the description of the common density by means of convexification arguments. Classical relaxation results are extended to the case of the continuous variable dependence, and the non-identity features described in the measurable dependence case are shown to be non-occurring. Proofs are based on the properties of certain limits of multi-functions, and on an approximation result for functions. Results in more general settings are also obtained

  18. Quality Time: Temporal Constraints to Continual Process Development in the Air Force

    Science.gov (United States)

    2017-06-01

    Simultaneously , forces of entropy or chaos continually degrade the efficiency of that same system. The strength and speed with which quality management...cause impact in the same direction (negative or inverse ) and logically result in a less-efficient unit. The SD concept of clustering variables behavior...working overtime but simultaneously maintaining morale. 30 Recall this test case was establish to test the logical

  19. A Continuous Formulation for Logical Decisions in Differential Algebraic Systems using Mathematical Programs with Complementarity Constraints

    Directory of Open Access Journals (Sweden)

    Kody M. Powell

    2016-03-01

    Full Text Available This work presents a methodology to represent logical decisions in differential algebraic equation simulation and constrained optimization problems using a set of continuous algebraic equations. The formulations may be used when state variables trigger a change in process dynamics, and introduces a pseudo-binary decision variable, which is continuous, but should only have valid solutions at values of either zero or one within a finite time horizon. This formulation enables dynamic optimization problems with logical disjunctions to be solved by simultaneous solution methods without using methods such as mixed integer programming. Several case studies are given to illustrate the value of this methodology including nonlinear model predictive control of a chemical reactor using a surge tank with overflow to buffer disturbances in feed flow rate. Although this work contains novel methodologies for solving dynamic algebraic equation (DAE constrained problems where the system may experience an abrupt change in dynamics that may otherwise require a conditional statement, there remain substantial limitations to this methodology, including a limited domain where problems may converge and the possibility for ill-conditioning. Although the problems presented use only continuous algebraic equations, the formulation has inherent non-smoothness. Hence, these problems must be solved with care and only in select circumstances, such as in simulation or situations when the solution is expected to be near the solver’s initial point.

  20. Hydro-Quebec is profitable

    International Nuclear Information System (INIS)

    Poirier, M.

    1997-01-01

    The pros and cons of the potential privatisation of Hydro-Quebec were discussed. A brief review of charges of less than competent management, low profitability and the corporation's recent administrative restructuring was presented. The general thrust of the argument was that Hydro-Quebec plays a crucial role in the economic development of Quebec, it can be made to be more profitable and that for the good of Quebec it should continue as a public corporation under the control of the provincial government

  1. CCM Continuity Constraint Method: A finite-element computational fluid dynamics algorithm for incompressible Navier-Stokes fluid flows

    Energy Technology Data Exchange (ETDEWEB)

    Williams, P. T. [Univ. of Tennessee, Knoxville, TN (United States)

    1993-09-01

    As the field of computational fluid dynamics (CFD) continues to mature, algorithms are required to exploit the most recent advances in approximation theory, numerical mathematics, computing architectures, and hardware. Meeting this requirement is particularly challenging in incompressible fluid mechanics, where primitive-variable CFD formulations that are robust, while also accurate and efficient in three dimensions, remain an elusive goal. This dissertation asserts that one key to accomplishing this goal is recognition of the dual role assumed by the pressure, i.e., a mechanism for instantaneously enforcing conservation of mass and a force in the mechanical balance law for conservation of momentum. Proving this assertion has motivated the development of a new, primitive-variable, incompressible, CFD algorithm called the Continuity Constraint Method (CCM). The theoretical basis for the CCM consists of a finite-element spatial semi-discretization of a Galerkin weak statement, equal-order interpolation for all state-variables, a 0-implicit time-integration scheme, and a quasi-Newton iterative procedure extended by a Taylor Weak Statement (TWS) formulation for dispersion error control. Original contributions to algorithmic theory include: (a) formulation of the unsteady evolution of the divergence error, (b) investigation of the role of non-smoothness in the discretized continuity-constraint function, (c) development of a uniformly H1 Galerkin weak statement for the Reynolds-averaged Navier-Stokes pressure Poisson equation, (d) derivation of physically and numerically well-posed boundary conditions, and (e) investigation of sparse data structures and iterative methods for solving the matrix algebra statements generated by the algorithm.

  2. Reinforcement learning for adaptive optimal control of unknown continuous-time nonlinear systems with input constraints

    Science.gov (United States)

    Yang, Xiong; Liu, Derong; Wang, Ding

    2014-03-01

    In this paper, an adaptive reinforcement learning-based solution is developed for the infinite-horizon optimal control problem of constrained-input continuous-time nonlinear systems in the presence of nonlinearities with unknown structures. Two different types of neural networks (NNs) are employed to approximate the Hamilton-Jacobi-Bellman equation. That is, an recurrent NN is constructed to identify the unknown dynamical system, and two feedforward NNs are used as the actor and the critic to approximate the optimal control and the optimal cost, respectively. Based on this framework, the action NN and the critic NN are tuned simultaneously, without the requirement for the knowledge of system drift dynamics. Moreover, by using Lyapunov's direct method, the weights of the action NN and the critic NN are guaranteed to be uniformly ultimately bounded, while keeping the closed-loop system stable. To demonstrate the effectiveness of the present approach, simulation results are illustrated.

  3. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    McCredie, J.

    1984-01-01

    This report briefly describes Ontario Hydro's nuclear program, examining the design and construction status, and the future from Ontario Hydro's perspective. Ontario Hydro relies heavily on nuclear power. Nuclear fuel was responsible for approximately 34% of Ontario Hydro's energy production in 1983. The nuclear proportion was supplied by twelve operating units located: NPD, Douglas Point, Pickering A and B. It is expected that by approximately 1992, 65% of the total energy needs will be generated through nuclear power

  4. Reinforcement-Learning-Based Robust Controller Design for Continuous-Time Uncertain Nonlinear Systems Subject to Input Constraints.

    Science.gov (United States)

    Liu, Derong; Yang, Xiong; Wang, Ding; Wei, Qinglai

    2015-07-01

    The design of stabilizing controller for uncertain nonlinear systems with control constraints is a challenging problem. The constrained-input coupled with the inability to identify accurately the uncertainties motivates the design of stabilizing controller based on reinforcement-learning (RL) methods. In this paper, a novel RL-based robust adaptive control algorithm is developed for a class of continuous-time uncertain nonlinear systems subject to input constraints. The robust control problem is converted to the constrained optimal control problem with appropriately selecting value functions for the nominal system. Distinct from typical action-critic dual networks employed in RL, only one critic neural network (NN) is constructed to derive the approximate optimal control. Meanwhile, unlike initial stabilizing control often indispensable in RL, there is no special requirement imposed on the initial control. By utilizing Lyapunov's direct method, the closed-loop optimal control system and the estimated weights of the critic NN are proved to be uniformly ultimately bounded. In addition, the derived approximate optimal control is verified to guarantee the uncertain nonlinear system to be stable in the sense of uniform ultimate boundedness. Two simulation examples are provided to illustrate the effectiveness and applicability of the present approach.

  5. Analysis of the spontaneous variations in wind power and necessary continuous regulation of hydro-electric and thermal power, related to a future Swedish power system

    Energy Technology Data Exchange (ETDEWEB)

    Holm, J O; Lindstrom, P O

    1982-09-01

    Wind power is unlike conventional electric power generation, since the output fluctuates uncontrollably. These fluctuations must be balanced by controlled generation from other power sources. This will create new and interesting demands on the reserves in the power system. The short-term fluctuations have a low simultaneity factor and must be balanced by an automatic frequency control reserve. In Sweden, this consists of automatically controlled hydro-electric power. The report contains calculations of the amount by which the demand on reserves will increase when wind power is introduced.

  6. Competition policy and regulation in hydro-dominated electricity markets

    International Nuclear Information System (INIS)

    Rangel, Luiz Fernando

    2008-01-01

    This paper discusses the main competition issues that arise in electricity systems dominated by hydro generation, arguing that technological differences between hydro and thermal plants may allow hydropower producers to exert market power in different and subtler ways compared to thermal generators. The key for market power in hydro-based systems is the strategic allocation of a given amount of output across periods, rather than a straightforward reduction of total output. The paper examines the interaction between strategic hydro reservoir operation and transmission capacity constraints, and summarizes the implications of market power for system reliability. A review of recent relevant literature is included. Finally, possible interventions to mitigate market power are analysed

  7. Fixing hydro - The forgotten renewable

    International Nuclear Information System (INIS)

    Nalder, N.

    1992-01-01

    Since the dawn of civilization, man has captured the energy potential of falling water, from the water wheels in the fertile crescent of ancient times to today's highly sophisticated conventional and pumped storage projects. As we approach the 21st century, electric energy captured from falling water provides 2.0 trillion kilowatt-hours (21.23 quadrillion Btu), roughly 20% of the world's electric energy. Of the 2.56 billion kilowatts of the world's installed electric generating capacity, hydropower accounts for 24%. Between 1980 and 1989, world generation of hydroelectric power rose from 1.7 trillion kWh to 2.0 trillion kWh. As of January 1, 1988, the US has 90.5 million kW of installed hydro capacity - 70.8 million kW of it under license by the Federal Energy Regulatory Commission - with annual generation estimated at just under 300 billion kWh. Hydro's share, which not long ago comprised 13% of the nation's total capacity, now is just a 9% share. The US has the option to choose one or another path for hydro. If policy makers are willing to coast on a cushion of cheap natural gas, they will continue to shun hydro and put obstacles in its path. But if they come to regard hydro as an attractive resource - as they did only recently - economically and environmentally, they will encourage more balance in resource policies. Believing that interest in a balanced national resource portfolio will grow, the author reviews the past and suggests a possible future course of reasonable development for hydro. The article concludes with some suggested principles that will be needed if the appropriate balance is to be found

  8. Ontario Hydro's DSP update

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Ontario Hydro's Demand/Supply Plan (DSP), the 25 year plan which was submitted in December 1989, is currently being reviewed by the Environmental Assessment Board (EAB). Since 1989 there have been several changes which have led Ontario Hydro to update the original Demand/Supply Plan. This information sheet gives a quick overview of what has changed and how Ontario Hydro is adapting to that change

  9. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    International Nuclear Information System (INIS)

    Wiebe, P.A.

    1994-01-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs

  10. Home grown hydro, part 1: Hydro development in Canada key to regional, international business expansion

    Energy Technology Data Exchange (ETDEWEB)

    Wiebe, P.A

    1994-06-01

    Canada has had a long and successful record of hydroelectric power development since the first hydraulic generators were installed at Chaudiere Falls near Ottawa in 1881. Canadian hydro engineers have demonstrated their ability to develop and manage higher voltages, longer transmission networks, larger projects, remote sites, and undersea cable technology. Canada has earned a reputation for excellence in the hydro industry and is successful at exporting its expertise to develop hydro resources in the international market. A prominent example is provided by the Three Gorges Project in China, for which the Chinese Ministry of Energy searched for the best foreign engineers to prepare a feasibility report. A Canadian team that integrated the expertise of hydro consultants, utilities, and major equipment suppliers was chosen to prepare the report, winning over teams from the USA, Brazil, and Europe. Success in this initiative is attributed to Canada's ability to demonstrate the favorable application of new technology at James Bay. Domestic hydro projects are thus seen as crucial in efforts to expand into international markets. However, Canada's new completed hydro capacity has fallen dramatically since 1986, and Canadian hydro contractors have tended to remain domestic operators with little incentive to enter foreign markets. By having the foresight to begin new hydro developments now, Canada would benefit from increased employment and orders for equipment, and would ensure a continuing base of technical expertise and innovation in the electrical industry. 2 figs.

  11. Hydro-energy

    International Nuclear Information System (INIS)

    Bacher, P.; Tardieu, B.

    2005-01-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  12. Hydro-climatology

    DEFF Research Database (Denmark)

    The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal with under......The hydro-climatological approach of this volume illustrates the scientific and practical value of considering hydrological phenomena and processes in a climate context to improve understanding of controls, process interaction, and past and future variability/change. Contributions deal...... considered. The interdisciplinary approach reveals information and perspective that go beyond the study of cli ate and hydro gy alone...

  13. Hydro under shock

    International Nuclear Information System (INIS)

    Maffezzini, I.; Pineault, E.; Poirier, M.

    1997-01-01

    A discussion of the potential privatisation of Hydro-Quebec, and of the motivation to do so, was presented. The creation of Hydro-Quebec resulted from the nationalization in 1963 of all major electricity producers in the province of Quebec. Since its inception, Hydro-Quebec has gone through many episodes of restructuring but none more far reaching in extent, or in consequences, than the present one. The current deregulation of the electrical industry in Quebec, and the potential commercialization of Hydro-Quebec is considered to be a natural and inevitable result of the current global trend towards competition in the power industry and the demand for greater consumer choice. 1 tab

  14. Brigham City Hydro Generation Project

    Energy Technology Data Exchange (ETDEWEB)

    Ammons, Tom B. [Energy Conservation Specialist, Port Ewen, NY (United States)

    2015-10-31

    Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and

  15. Hydro power flexibility for power systems with variable renewable energy sources: an IEA Task 25 collaboration: Hydro power flexibility for power systems

    Energy Technology Data Exchange (ETDEWEB)

    Huertas-Hernando, Daniel [Department of Energy Systems, SINTEF, Trondheim Norway; Farahmand, Hossein [Department of Electric Power Engineering, Norwegian University of Science and Technology (NTNU), Trondheim Norway; Holttinen, Hannele [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Kiviluoma, Juha [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Rinne, Erkka [Department of Energy Systems, VTT Technical Research Centre of Finland, Espoo Finland; Söder, Lennart [Department of Electrical Engineering, KTH University, Stockholm Sweden; Milligan, Michael [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Ibanez, Eduardo [Transmission and Grid Integration Group, National Renewable Energy Laboratory' s National Wind Technology Center, Golden CO USA; Martínez, Sergio Martín [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Gomez-Lazaro, Emilio [Department of Electrical Engineering, Electronics, Automation and Communications, Universidad de Castilla-La Mancha, Albacete Spain; Estanqueiro, Ana [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Rodrigues, Luis [National Laboratory of Energy and Geology - LNEG, Lisbon Portugal; Carr, Luis [Research Association for Energy Economics (FfE GmbH), Munich Germany; van Roon, Serafin [Research Association for Energy Economics (FfE GmbH), Munich Germany; Orths, Antje Gesa [Energinet.dk, Fredericia Denmark; Eriksen, Peter Børre [Energinet.dk, Fredericia Denmark; Forcione, Alain [Hydro Quebec, Montréal Canada; Menemenlis, Nickie [Hydro Quebec, Montréal Canada

    2016-06-20

    Hydro power is one of the most flexible sources of electricity production. Power systems with considerable amounts of flexible hydro power potentially offer easier integration of variable generation, e.g., wind and solar. However, there exist operational constraints to ensure mid-/long-term security of supply while keeping river flows and reservoirs levels within permitted limits. In order to properly assess the effective available hydro power flexibility and its value for storage, a detailed assessment of hydro power is essential. Due to the inherent uncertainty of the weather-dependent hydrological cycle, regulation constraints on the hydro system, and uncertainty of internal load as well as variable generation (wind and solar), this assessment is complex. Hence, it requires proper modeling of all the underlying interactions between hydro power and the power system, with a large share of other variable renewables. A summary of existing experience of wind integration in hydro-dominated power systems clearly points to strict simulation methodologies. Recommendations include requirements for techno-economic models to correctly assess strategies for hydro power and pumped storage dispatch. These models are based not only on seasonal water inflow variations but also on variable generation, and all these are in time horizons from very short term up to multiple years, depending on the studied system. Another important recommendation is to include a geographically detailed description of hydro power systems, rivers' flows, and reservoirs as well as grid topology and congestion.

  16. Provincial hydro expansions

    Energy Technology Data Exchange (ETDEWEB)

    Froschauer, K J

    1993-01-01

    A study of the development of five provincial hydroelectric utilities in Canada indicates that power companies and the state invited manufacturers to use hydroelectricity and natural resources in order to diversify provincial economies. These hydro expansions also show that utilities and government designed hydro projects to serve continental requirements; serving both objectives became problematic. It is argued that when the Canadian state and firms such as utilities use hydro expansions to serve both continentalism and industrialization, then at best they foster dependent industrialization and staple processing. At worst, they overbuild the infrastructure to generate provincial surplus energy for continental, rather than national, integration. Hydro developments became subject to state intervention in Canada mainly through the failures of private utilities to provide power for the less-lucrative industrial markets within provincial subregions. Although the state and utilities invited foreign firms to manufacture hydro equipment within the provinces and others to use electricity to diversify production beyond resource processing, such a diversification did not occur. Since 1962, ca 80% of industrial energy was used to semi-process wood-derived products, chemicals, and metals. The idea for a national power network became undermined by interprovincial political-economic factors and since 1963, the federal national/continential power policy prevailed. 187 refs., 6 figs., 52 tabs.

  17. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  18. Small steps for hydro

    International Nuclear Information System (INIS)

    Wicke, Peter

    1998-01-01

    The government in Peru has decided to utilise its gas reserves and restrict hydro to relatively small schemes. A number of reasons for the decision are given. In 1997, the Shell-Mobile-Bechtel-COSAPI consortium was formed and agreements were signed regarding exploiting Gas de Camisea. The country's energy needs to 2010 are being assessed. It is likely that by 2001 the whole of south Peru will be receiving gas from Camisea. The Peru situation is discussed under the headings of (i) existing capacity, (ii) growing demands, (iii) a history of hydro in Peru, (iv) electrification and SHP and (v) outlook. The future for Peru's electric energy development is bright. While most of its new power capacity will come from natural gas, the small hydros also have a part to play. A stronger commitment of national and regional political authorities to consider supplies outside the big cities is said to be needed. (UK)

  19. Discussion about decision support systems using continuous multi-criteria methods for planning in areas with hydro-basins, agriculture and forests, from examples in Argentine.

    Science.gov (United States)

    Anton, J. M.; Grau, J. B.; Tarquis, A. M.; Andina, D.; Cisneros, J. M.; Sanchez, E.

    2012-04-01

    The authors were involved last years in projects considering diverse decision problems on the use of some regions in Argentine, and also related to rivers or rural services in them. They used sets of multi-criteria decision methods, first discrete when the problem included few distinct alternatives, such as e.g. forestry, traditional or intensive agriculture. For attributes they were different effects, classified then in environmental, economic and social criteria. Extending to other gentler areas, such as at South of the Province of Córdoba, Arg., they have balanced more delicately effects of continuous levels of actions, with a combination of Goal Programming linked methods, and they adopted compromises to have precise solutions. That has shown, and in part open, a line of research, as the setting of such models require various kinds of definitions and valuations, including optimizations, goals with penalties in deviations and restrictions. That can be in diverse detail level and horizon, in presence of various technical and human horizons, and that can influence politics of use of terrain and production that will require public and private agents. The research will consider consideration of use and conservation of soils, human systems and agro productions, and hence models for optimization, preferably in such Goal Programming ways. That will require considering various systems of models, first in theory to be reliable, and then in different areas to evaluate the quality of conclusions, and maybe that successively if results are found advantageous. The Bayesian ways will be considered, but they would require a prospective of sets of precise future states of nature or markets with elicited probabilities, which are neither evident nor decisive for the moment, as changes may occur in years but will be very unexpected or uncertain. The results will be lines of models to aid to establish policies of use of territories, by public agencies setting frames for private

  20. Ontario Hydro decontamination experience

    Energy Technology Data Exchange (ETDEWEB)

    Lacy, C S; Patterson, R W; Upton, M S [Chemistry and Metallurgy Department, Central Production Services, Ontario Hydro, ON (Canada)

    1991-04-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  1. Ontario Hydro decontamination experience

    International Nuclear Information System (INIS)

    Lacy, C.S.; Patterson, R.W.; Upton, M.S.

    1991-01-01

    Ontario Hydro currently operates 18 nuclear electric generating units of the CANDU design with a net capacity of 12,402 MW(e). An additional 1,762 MW(e) is under construction. The operation of these facilities has underlined the need to have decontamination capability both to reduce radiation fields, as well as to control and reduce contamination during component maintenance. This paper presents Ontario Hydro decontamination experience in two key areas - full heat transport decontamination to reduce system radiation fields, and component decontamination to reduce loose contamination particularly as practised in maintenance and decontamination centres. (author)

  2. Continuous-time mean-variance portfolio selection with value-at-risk and no-shorting constraints

    Science.gov (United States)

    Yan, Wei

    2012-01-01

    An investment problem is considered with dynamic mean-variance(M-V) portfolio criterion under discontinuous prices which follow jump-diffusion processes according to the actual prices of stocks and the normality and stability of the financial market. The short-selling of stocks is prohibited in this mathematical model. Then, the corresponding stochastic Hamilton-Jacobi-Bellman(HJB) equation of the problem is presented and the solution of the stochastic HJB equation based on the theory of stochastic LQ control and viscosity solution is obtained. The efficient frontier and optimal strategies of the original dynamic M-V portfolio selection problem are also provided. And then, the effects on efficient frontier under the value-at-risk constraint are illustrated. Finally, an example illustrating the discontinuous prices based on M-V portfolio selection is presented.

  3. A latent class multiple constraint multiple discrete-continuous extreme value model of time use and goods consumption.

    Science.gov (United States)

    2016-06-01

    This paper develops a microeconomic theory-based multiple discrete continuous choice model that considers: (a) that both goods consumption and time allocations (to work and non-work activities) enter separately as decision variables in the utility fu...

  4. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Pousinho, H.M.I.; Mendes, V.M.F.

    2010-01-01

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach.

  5. Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-03-15

    This paper is on the problem of short-term hydro scheduling, particularly concerning head-dependent cascaded hydro systems. We propose a novel mixed-integer quadratic programming approach, considering not only head-dependency, but also discontinuous operating regions and discharge ramping constraints. Thus, an enhanced short-term hydro scheduling is provided due to the more realistic modeling presented in this paper. Numerical results from two case studies, based on Portuguese cascaded hydro systems, illustrate the proficiency of the proposed approach. (author)

  6. Small hydro in Africa

    CSIR Research Space (South Africa)

    Jonker Klunne, W

    2011-10-01

    Full Text Available hydro, the author has started an online database of small hydropower projects in eastern and southern Africa. The main aim of the database is to catalogue the current situation and to make that accessible to policymakers, project developers, as well...

  7. Eddington-inspired Born-Infeld gravity: nuclear physics constraints and the validity of the continuous fluid approximation

    Energy Technology Data Exchange (ETDEWEB)

    Avelino, P.P., E-mail: ppavelin@fc.up.pt [Centro de Astrofísica da Universidade do Porto, Rua das Estrelas, 4150-762 Porto (Portugal)

    2012-11-01

    In this paper we investigate the classical non-relativistic limit of the Eddington-inspired Born-Infeld theory of gravity. We show that strong bounds on the value of the only additional parameter of the theory κ, with respect to general relativity, may be obtained by requiring that gravity plays a subdominant role compared to electromagnetic interactions inside atomic nuclei. We also discuss the validity of the continuous fluid approximation used in this and other astrophysical and cosmological studies. We argue that although the continuous fluid approximation is expected to be valid in the case of sufficiently smooth density distributions, its use should eventually be validated at a quantum level.

  8. Eddington-inspired Born-Infeld gravity: nuclear physics constraints and the validity of the continuous fluid approximation

    International Nuclear Information System (INIS)

    Avelino, P.P.

    2012-01-01

    In this paper we investigate the classical non-relativistic limit of the Eddington-inspired Born-Infeld theory of gravity. We show that strong bounds on the value of the only additional parameter of the theory κ, with respect to general relativity, may be obtained by requiring that gravity plays a subdominant role compared to electromagnetic interactions inside atomic nuclei. We also discuss the validity of the continuous fluid approximation used in this and other astrophysical and cosmological studies. We argue that although the continuous fluid approximation is expected to be valid in the case of sufficiently smooth density distributions, its use should eventually be validated at a quantum level

  9. Hydro turbines: An introduction

    International Nuclear Information System (INIS)

    Gordon, J.L.

    1993-01-01

    The various types of hydraulic turbines currently used in hydroelectric power plants are described. The descriptions are intended for use by non-engineers who are concerned with fish passage and fish mortality at a hydro power facility. Terminology used in the hydro industry is explained. Since the extent of cavitation is one of the factors affecting mortality rates of fish passing through hydraulic turbines, an equation is introduced which measures the extent of cavitation likely to be experienced in a turbine. An example of how the cavitation index can be calculated is provided for two typical power plants. The relation between certain parameters of power plant operation and the extent of cavitation, and therefore of fish mortality, is illustrated. 2 refs., 14 figs

  10. The hydro digest

    Energy Technology Data Exchange (ETDEWEB)

    Scheil, Hermann [Itaipu Mondig, Power Generation Group (KWU), Siemens AG, Erlangen (Germany)

    2000-12-01

    Digest WK is an analysis and diagnostics system for turbine generators in large hydroelectric plant: it was developed from the Digest system which has been used in steam turbine plants for many years. The system is in use at the world's biggest hydro plant in Itaipu Binacional between Paraguay and Brazil. The system is described under the sub-headings of (a) monitoring concept; (b) the Digest WK system; (c) vibration monitoring; (d) generator temperature analysis and (e) outlook.

  11. Rural hydro technology

    International Nuclear Information System (INIS)

    Fowlie, M.

    1999-01-01

    This paper examines the increasing use of micro hydroelectric schemes for power generation in mountainous communities in Asia to alleviate some of the pressures on forests. An example of such a scheme in Pakistan is given, and the installation and operation of small hydro units, socio-economic factors, and the impact of the projects on the position of women in the community are discussed. (UK)

  12. Vaksvikelva small hydro

    OpenAIRE

    Loe, Daniel Aarset

    2017-01-01

    Norway is in constant need of renewable energy, and hydroelectric power is still the main source. A great future potential can be found in countless small rivers scattered across the country, which could be developed through small hydro projects. In the process of converting mechanical movement - flowing water - into electric energy, about 5% turns into heat. From a power plant with an annual production of 15 GWh, this means energy enough to heat approximately 30 households is lost. In my pro...

  13. Hydro-power

    International Nuclear Information System (INIS)

    Piro, P.

    2010-01-01

    On average the hydro-power sector produces 12% of the electrical power in France. A quarter of this production might pass to another operator than EDF because the end of some grants is nearing (2012 for 12 installations). In France the power of rivers belongs to the state that gives operators grants to harness it. The allowance lasts 75 years usually but for installations below 4.5 MW a permanent and definitive grant is allowed. Most installations are ancient and their investment have been paid off since a long, so hydro-power is the most profitable renewable energy in France. A lot of bidders are expected. Each bid will be assessed on 3 criteria: -) the global energy efficiency of the waterfall, -) a balanced management of the water resource, and -) an economic and financial offer to the state. The balance between the different uses of water is getting more delicate to reach and this renewal of grants will be an opportunity for the state to impose a better preservation of the environment. In July 2008, the French government announced a program for the re launching of the hydro-power, this program has been reduced and now only 3000 GWh supplementary are expected by 2020. (A.C.)

  14. Hydro-Quebec 2005 annual report : people with energy

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec generates, transmits and distributes electricity mainly produced by renewable energy sources. Its sole shareholder is the Quebec government. This annual report reviewed the operations of Hydro-Quebec, and provided data on energy sales, production and details of the utility's environmental programs. Information on Hydro-Quebec subsidiaries in 2005 was presented in the following separate sections: Hydro-Quebec Production; Hydro-Quebec TransEnergie; Hydro-Quebec Distribution; Hydro-Quebec Equipement; and the Societe d'energie de la Baie James. In 2005, Hydro-Quebec Distribution signed contracts for an initial block of 990 MW of wind power and issued a tender call for an additional 2000 MW of wind power. A generator balancing service was created and authorized by the Regie de l'energie. Hydro-Quebec customers have achieved energy savings of nearly 450 GWh in 2005. The commissioning of Toulnustouc generating station was achieved 5 months ahead of schedule. The 526 MW facility will generate 2.7 TWh annually. Work at the Chute-Allard and Rapide-des-Coeurs sites has continued, as well as construction at Mercier and Peribonka and Eastmain-1. Income from continuing operations came to $2.25 billion, a $124 million increase that was attributed to a rise in domestic sales and net short-term exports. The income was offset by higher pension expenses, depreciation and amortization, as well as by cost of supply on external markets and financial expenses. All other operating expenses were lower than in 2004. Capital spending for the transmission system reached its highest level since 1997, with $793 million invested, including $336 million to meet growth. Data on the company's financial performance, executive changes and reorganization were provided. Financial statements included a review and analysis of financial transactions, an auditor's report, as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and

  15. Hydro investment analysis under new market conditions

    Energy Technology Data Exchange (ETDEWEB)

    Doorman, Gerard

    2010-07-01

    Full text: A future energy system with stronger coupling to Europe and with an increased share of non-regulated renewables will lead to increasing variability of the demand faced by the hydro system. In a market based system these variations will be reflected by larger daily price variations, both in the Elspot day ahead market, the Elbas intraday market and in the balancing market. With its unique regulation capabilities, hydro power will be very well positioned to handle these variations. However, existing model concepts for long term hydro scheduling were not developed for this framework, and do not take the new market conditions into account to a sufficient degree. Therefore hydro scheduling tools used for upgrading and investment analysis as well as analysing consequences of new environmental demands need adaptation to a finer temporal resolution, and to perform optimisation under varying constraints and uncertain input data for inflow and electricity prices. Focus is on investment analysis for a river system or power producer. Existing models can be grouped in the long-term (scheduling models with a time horizon up to 5 years) EOPS (Vansimtap), EOPS-ST (SimtapEffekt) and ProdRisk, and the shortterm scheduling models with a typical time horizon up to a few weeks, but focus on 1-2 days (SHOP and ID-SIM). A perfect tool in the present context would combine the properties of the long term stochastic optimisation models with the modelling details of SHOP and/or ID-SIM. However, this is probably not possible and simplifications will be necessary. Some important deficiencies in the present long term models are: Insufficiently realistic plant models in the relevant optimization models; Time delays are not handled; Handing of flexible / state dependent constraints; Handling of ramping constraints; Modelling of the cost of frequent regulations (wear and tear); Reserve markets As a result of these deficiencies the investment analysis does not adequately assess the value

  16. Challenging hydro-hegemony

    DEFF Research Database (Denmark)

    Wessels, Josepha Ivanka

    2015-01-01

    Bank. Both case studies show that control over water resources and supply provides political power over others at local level. Yet non-violent resistance can be observed in these border areas. In border areas between Israel, Syria and Palestine, control over access and water supply plays an important...... role in the ability of Israel to exercise hegemonic power in daily hydro-politics, which in the long term is detrimental for the people and the environment and disrupts the hydrological balance in the entire Jordan River basin....

  17. Ontario Hydro annual report 1986

    Energy Technology Data Exchange (ETDEWEB)

    1987-04-01

    Ontario Hydro`s annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics.

  18. Hydro-energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Bacher, P. [Electricite de France (EDF), 75 - Paris (France); Tardieu, B. [Coyne et Bellier, 92 - Gennevilliers (France)

    2005-07-01

    The first part of this study concerns the different type of hydraulic works. The second part presents the big hydro-energy, its advantages and disadvantages, the industrial risks, the electric power transport network, the economy and the development perspectives. The third part presents the little hydro-energy, its advantages and disadvantages, the decentralized production and the development perspectives. (A.L.B.)

  19. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Jackson, H.A.; Woodhead, L.W.; Fanjoy, G.R.

    1984-03-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on the operating performance and costs, reliability of system components and nuclear safety considerations for the workers and the public

  20. Ontario Hydro CANDU operating experience

    International Nuclear Information System (INIS)

    Bartholomew, R.W.; Woodhead, L.W.; Horton, E.P.; Nichols, M.J.; Daly, I.N.

    1987-01-01

    The CANDU Pressurized Heavy Water (CANDU-PHW) type of nuclear-electric generating station has been developed jointly by Atomic Energy of Canada Limited and Ontario Hydro. This report highlights Ontario Hydro's operating experience using the CANDU-PHW system, with a focus on worker and public safety, operating performance and costs, and reliability of system components

  1. Ontario Hydro's nuclear program

    International Nuclear Information System (INIS)

    Jackson, H.A.

    1982-06-01

    In 1981 Ontario Hydro generated over 100 billion KWh of electrical energy. Approximately one third of this was from nuclear units. There are ten CANDU units (5 250 MW) currently in operation, and another twelve (8 600 MW) are under construction. The presently committed nuclear expansion program is estimated to involve expenditures of 16 billion dollars over the next 10 years. About 10 000 people are employed in the nuclear design and construction program. All projects are generally on schedule, with the stations coming into service during the following time periods: Pickering B, 1983-85; Bruce B, 1984-87; Darlington, 1988-90. The status of each project is reviewed. Planning is underway for some retubing projects, as early as 1985 for Pickering A

  2. Pico hydro power for rural electrification in developing countries

    International Nuclear Information System (INIS)

    Maher, P.; Smith, N.P.A.; Williams, A.A.

    1998-01-01

    Pico hydro power is a renewable energy system which has the potential to provide millions of rural people world-wide with a cheap, sustainable source of electricity. The development of new, cost-reducing approaches, including local manufacture and implementation in developing countries, has increased the accessibility of this technology to large numbers of people. The new approaches are investigated and some of the present constraints to wider adoption of this technology are analysed. (Author)

  3. Hydro-Quebec strategic plan 2006-2010

    International Nuclear Information System (INIS)

    2006-01-01

    Hydro-Quebec produces, transmits and distributes electricity through the use of renewable energy sources, particularly hydroelectricity. It also conducts research in energy related fields. This document listed the strategic plan for Hydro-Quebec's 4 main divisions: Hydro-Quebec Production, Hydro-Quebec TransEnergie, Hydro-Quebec Distribution and Hydro-Quebec Energy Society of Bay James. The 2006 to 2010 strategic plan continues to focus on 3 main priorities: energy efficiency; complementary development of hydroelectricity and wind power; and, technological innovation. Hydro-Quebec's objectives also include strengthening the security of Quebec's energy supply and making use of energy as a lever for economic development. The plan for Hydro-Quebec Production calls for accelerating the development of major hydroelectric projects and promoting other renewable forms of energy such as wind power and ensuring the efficiency and reliability of the generating fleet. The utility's objective is to reach 4.7 TWh in energy savings by 2010 and to work toward a target of 8 TWh by 2015. The plan also involves a portfolio of hydroelectric projects totaling 5,400 MW. The plan includes complementary development and integration of 4,000 MW of windpower by 2015. The plan for Hydro-Quebec TransEnergie calls for system reliability and becoming a world benchmark for quality and reliability in wind power integration and deployment of new technologies to enhance performance. The plan for Hydro-Quebec Distribution calls for more efficient use of electricity, increase customer satisfaction and meet electricity needs through the use of renewable energy sources. The utility has made a commitment for 2006 to 2010 to a net income of $2.5 billion per year for a total of $12.5 billion, and a capital investment of 19.4 billion. This paper outlined the contribution of each division to net income and listed the economic benefits for the 2006 to 2010 period. In 2006, the Quebec Energy Board authorized

  4. Optimal hydro scheduling and offering strategies considering price uncertainty and risk management

    International Nuclear Information System (INIS)

    Catalão, J.P.S.; Pousinho, H.M.I.; Contreras, J.

    2012-01-01

    Hydro energy represents a priority in the energy policy of Portugal, with the aim of decreasing the dependence on fossil fuels. In this context, optimal hydro scheduling acquires added significance in moving towards a sustainable environment. A mixed-integer nonlinear programming approach is considered to enable optimal hydro scheduling for the short-term time horizon, including the effect of head on power production, start-up costs related to the units, multiple regions of operation, and constraints on discharge variation. As new contributions to the field, market uncertainty is introduced in the model via price scenarios and risk management is included using Conditional Value-at-Risk to limit profit volatility. Moreover, plant scheduling and pool offering by the hydro power producer are simultaneously considered to solve a realistic cascaded hydro system. -- Highlights: ► A mixed-integer nonlinear programming approach is considered for optimal hydro scheduling. ► Market uncertainty is introduced in the model via price scenarios. ► Risk management is included using conditional value-at-risk. ► Plant scheduling and pool offering by the hydro power producer are simultaneously considered. ► A realistic cascaded hydro system is solved.

  5. Taylor Hydro plant goes live

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The 12.75 MW Taylor Hydroelectric Plant in Magrath, Alberta, synchronized its generator with the Alberta Power Grid and began production in April 2000. The plant is located on Government of Alberta irrigation works and is owned by Canadian Hydro Developers. During the irrigation season the plant will generate approximately 40 million kilowatt hours of zero-emission 'green' power for consumption, enough to power 5,000 homes for a year. The Taylor plant is a joint venture with EPCOR Power Development Corporation, a wholly-owned subsidiary of EPCOR Inc., the City of Edmonton utility. Canadian Hydro Developers also owns a 19 MW wind plant and a 6 MW gas plant in Alberta and five other 'run of river' hydro plants in Ontario and British Columbia. The company is committed to the concept of low-impact power generation; its ownership of wind run-of-river hydro and gas-fired facilities is proof of that commitment

  6. Hydro-Quebec looks south

    International Nuclear Information System (INIS)

    Ross, P.

    1997-01-01

    The recent introduction of Hydro-Quebec, the Canadian utility, into selling cheap electric power in the United States (US) deregulated power market is described, following applications to the US Federal Energy Regulatory Commission. As its prices are so much cheaper than its US competitors, it is expected that the company will soon have many willing customers across the USA. Hydro-Quebec will remain a publicly owned utility, but has experienced restructuring in order to meet this new competitive challenge. (UK)

  7. Hydro-mechanical processes

    Energy Technology Data Exchange (ETDEWEB)

    Laouafa, F.; Kazmierczak, J.B. [Institut National de l' Environnement Industriel et des Risques (INERIS), Parc Technologique ALATA, 60 - Verneuil en Halatte (France); Armand, G. [Agence Nationale pour la Gestion des Dechets Radioactifs, Lab. de Souterrain de Meuse/Haute-Marne, 55 - Bure (France); Vaunat, J. [Catalonia UPC- Technical Univ., Barcelona (Spain); Jobmann, M.; Polster, M. [DBETEC- DBE Technology GmbH, Peine (Germany); Su, K.; Lebon, P.; Plas, F.; Armand, G.; Abou-Chakra Guery, A.; Cormery, F.; Shao, J.F.; Kondo, D. [ANDRA - Agence Nationale pour la Gestion des Dechets Radioactifs, 92 - Chatenay Malabry (France); Souley, M. [Institut National de l' Environnement Industriel et des Risques (INERIS), 54 - Nancy (France); Coll, C.; Charlier, R.; Collin, F.; Gerard, P. [Liege Univ., Dept. ArGEnCo (Belgium); Xiang Ling, Li [ESV EURIDICE, SCK.CEN, Belgian Nuclear Research Centre, Mol (Belgium); Collin, F. [Liege Univ., Charge de Recherches FNRS (Belgium); Pellet, F.L.; Fabre, G. [University Joseph Fourier, Laboratory 3S-R, 38 - Grenoble (France); Garcia-Sineriz, J.L.; Rey, M. [AITEMIN - Asociacion para la Investigacion y Desarrollo Industrial de los Recursos Naturales, Madrid (Spain); Mayor, J.C. [ENRESA - Empresa Nacional des Residuos Radioactivos, Madrid (Spain); Castellanos, E.; Romero, E.; Lloret, A.; Gens, A. [Catalunya Univ. Politecnica, UPC (Spain); Villar, M.V. [CIEMAT - Centro de Investigaciones Energeticas, Medioambientales y Tecnologicas, Madrid (Spain); Chambon, R. [Laboratoire 3S, UJF-INPG-CNRS, 38 - Grenoble (France); Czaikowski, O.; Lux, K.H. [Clausthal Univ. of Technology, Professorship for Waste Disposal and Geomechanics, Clausthal-Zellerfeld (Germany); Van Geet, M.; Bastiaens, W.; Volckaert, G.; Weetjens, E.; Sillen, X. [SCK-CEN, Waste and Disposal dept., Mol (Belgium); ONDRAF/NIRAS, Brussel (Belgium); Imbert, Ch. [CEA Saclay, Dept. de Physico-Chimie (DPC/SCCME/LECBA), 91 - Gif sur Yvette (France)] [and others

    2007-07-01

    This session gathers 13 articles dealing with: three-dimensional and time stepping modelling of the whole Meuse/Haute-Marne ANDRA URL (F. Laouafa, J.B. Kazmierczak, G. Armand, J. Vaunat, M. Jobmann, M. Polster); a constitutive model for a deep argillaceous rock using Hoek-Brown criteria (K. Su, C. Chavant, M. Souley); the long term behaviour of the Boom clay: influence of viscosity on the pore pressure distribution (C. Coll, R. Charlier, X.L. Li, F. Collin); the microstructural changes induced by viscoplastic deformations in argillaceous rocks (F.L. Pellet, G. Fabre, K. Su, P. Lebon); the engineered barrier experiment at Mont Terri rock laboratory (J.L. Garcia-Sineriz, M. Rey, J.C. Mayor); the chemical influence on the Hydro-Mechanical behaviour of high-density FEBEX bentonite (E. Castellanos, M.V. Villar, E. Romero, A. Lloret, A. Gens); the influence of water exchanges on the gallery convergence (P. Gerard, R. Charlier, R. Chambon, F. Collin); a new method for ageing resistant storage of argillaceous rock samples to achieve reproducible experimental results even after long intermediate storage times (O. Czaikowski, K.H. Lux); the installation and evaluation of a large-scale in-situ shaft seal experiment in Boom clay the RESEAL project M. Van Geet, W. Bastiaens, G. Volckaert, E. Weetjens, X. Sillen, A. Gens, M.V. Villar, Ch. Imbert, M. Filippi, F. Plas); the hydro-Mechanical response of the Callovo-Oxfordian mud-stone around a deep vertical drift (J. Vaunat, B. Garitte, A. Gens, K. Su, G. Armand); the sensitivity of total stress to changes in externally applied water pressure in KBS-3 buffer bentonite (J.F. Harrington, D.J. Birchall, P. Sellin); the comparison of the poro-elastic behavior of Meuse/Haute Marne and Tournemire argillites: effect of loading and saturation states (E. Bemer, A. Noiret, F. Homand, A. Rejeb); and the multi-scale modelling of the argillites mechanical behaviour (A. Abou-Chakra Guery, F. Cormery, K. Su, J.F. Shao, D. Kondo)

  8. Constraint Differentiation

    DEFF Research Database (Denmark)

    Mödersheim, Sebastian Alexander; Basin, David; Viganò, Luca

    2010-01-01

    We introduce constraint differentiation, a powerful technique for reducing search when model-checking security protocols using constraint-based methods. Constraint differentiation works by eliminating certain kinds of redundancies that arise in the search space when using constraints to represent...... results show that constraint differentiation substantially reduces search and considerably improves the performance of OFMC, enabling its application to a wider class of problems....

  9. Hydro-Quebec : positioning and strategic planning

    International Nuclear Information System (INIS)

    Lanoue, R.

    1998-01-01

    Hydro-Quebec's corporate concerns for 1998-2002 were highlighted. The Corporation's strategic plan envisages that within the next decade, the utility will boost sales by 25 per cent with an investment of $13.2 billion in new generation projects. The electric utility plans to build on past experience and maintain its electricity rates and service quality. Sustaining environmental quality while developing into a world class enterprise remains a major objective of the utility. Research and development will also continue to be an integral part of the utility's operations. Tabs., figs

  10. Sinkhole investigated at B.C. Hydro`s Bennett Dam

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1996-07-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro`s W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig.

  11. Ontario Hydro annual report 1985

    International Nuclear Information System (INIS)

    1986-04-01

    Ontario Hydro is a corporation without share capital created by a special statute of the Province of Ontario in 1906. It now operates under the authority of the Power Corporation Act, R.S.O. 1980, Chapter 384, as amended, with broad powers to generate, supply and deliver electric power throughout the province. It is also authorized to produce and sell steam and hot water as primary products. The Corporation's prime objective is to supply the people of Ontario with electricity at the lowest feasible cost consistent with high safety and quality of service standards. Ontario Hydro's main activity is wholesaling electric power to municipal utilities in urban areas who, in turn, retail it to customers in their service areas. In 1985, approximately 3,166,000 customers were served by Ontario Hydro and the municipal utilities in the province. Ontario Hydro operates 81 hydraulic, fossil and nuclear generating stations and an extensive power grid across Ontario to meet the province's demands for electric energy. Interconnections with other systems place the Corporation in an extensive electrical grid that covers a large segment of the North American continent. Ontario Hydro is a financially self-sustaining corporation. The Province of Ontario guarantees bonds and notes issued to the public by the Corporation

  12. Hydro One 2002 annual report

    International Nuclear Information System (INIS)

    2003-01-01

    Financial information from Hydro One was presented and a review of its 2002 operations was made available for the benefit of shareholders. Hydro One is the largest electricity delivery company in Ontario and one of the largest in North America. It began operation in 1999 after Ontario Hydro restructured its delivery and generation entities. Hydro One now includes power transmission, power distribution and telecom, with transmission and distribution operations representing 99 per cent of its business. This report indicates that in 2002, the utility had strong financial performance with $344 million in net income. The utility met its health and safety targets, and established a customer advisory board to improve customer satisfaction. A layer of management at the executive level was eliminated to stream-line decision-making and enhance productivity. The electricity network was upgraded and maintained through $546 million in capital expenditures. Non-core functions were sold to ensure a better focus on the core business of electricity delivery. This report presents an operations review as well as consolidated financial statements and common share information including the accounts of Hydro One and its share of assets, liabilities, revenues, expenses and cash flows. Revenue and expenditure statements were summarized by source. tabs., figs

  13. Invited Commentary: Continuing to Loosen the Constraints on Epidemiology in an Age of Change-A Comment on McMichael's "Prisoners of the Proximate".

    Science.gov (United States)

    Galea, Sandro

    2017-06-01

    Published in 1999, McMichael's "Prisoners of the Proximate: Loosening the Constraints on Epidemiology in an Age of Change" (Am J Epidemiol. 1999;149(10):887-897) outlined an exciting vision for epidemiology as the field that that can help us better understand the drivers of population health so that we may intervene, paving the way for healthier populations. McMichael's paper remains today what it was when it was first published: clear, thoughtful, provocative, and usefully prescriptive in its call to action. McMichael identified 4 constraints facing epidemiology. The field has risen to this challenge and addressed some of these constraints. I discuss how successful (or not) we have been in addressing each of these 4 challenges. © The Author 2017. Published by Oxford University Press on behalf of the Johns Hopkins Bloomberg School of Public Health. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  14. Himalayan hydro on the horizon

    International Nuclear Information System (INIS)

    Sharp, Timothy

    2000-01-01

    The prospects for development of hydro in the Himalayas has been enhanced by privatisation and the urgent need for clean electricity in the north of India. There are various hurdles to be overcome before the projects are likely to move forward in earnest before 2005, and these are mentioned. The demand for electricity in India is said to be enormous. At present, there is much polluting industry along the Himalayas. As throughout the Indian privatisation dilemma, the critical issues for development of Himalayan hydro come down to credible commercial power markets and finance. With regard to finance and administrative changes, the Indian government is carrying out a number of actions and these are itemised. The US is vigorously promoting the development of Himalayan hydro as a key to much needed regional co-operation and the World Bank is supportive

  15. Analysis of the Hydro-Quebec development plan 1992-2010

    International Nuclear Information System (INIS)

    Bernard, J.-T.; Genest-Laplante, E.

    1994-01-01

    In November 1992, the Quebec provincial utility Hydro-Quebec presented its development plan for the 1992-2010 period and shortly thereafter introduced its 1993-1995 energy efficiency commitments. The plan is analyzed using a model that incorporates the main institutional features of electricity price setting. Two scenarios are constructed. The first incorporates Hydro-Quebec's electricity demand forecast and the second allows electricity demand to respond to its price. A comparative analysis shows that electricity demand in the province should increase faster than forecast by Hydro-Quebec until 2010. In fact, demand could exceed the predicted level by ca 16 TWh, or 8.6%. This larger increase is due to a fall in the real price of electricity, itself caused by a government imposed fall in the real unit cost of the utility's operation. This last constraint is the real challenge faced by Hydro-Quebec. 12 refs., 7 tabs

  16. Strategies for growth of hydro electric power

    International Nuclear Information System (INIS)

    Khera, D.V.

    1998-01-01

    Hydro power on account of its several inherent advantages has a key role to play in the development of long term energy strategies based on diversified and balance use of natural national resources. Our country is fortunate to be endowed with large hydro-electric potential. It is estimated that the hydro potential while fully developed may yield to an installed capacity of 1,50,000 MW. An attempt has been made in this paper to examine and analyse the status and trend of hydro power development, need for accelerated development of hydro power, myths about hydro electric projects, principal causes responsible for scaling down of hydro share in the total installed capacity and strategies which could restore optimum hydro thermal mix. (author)

  17. Ontario Hydro looks at security

    International Nuclear Information System (INIS)

    Green, B.J.; Kee, B.

    1995-01-01

    Ontario Hydro operates 20 CANDU reactors on three different sites. Since 1984, a review of security arrangements on all the sites has taken place on a five-yearly basis. The review process for 1995 is outlined. The three objectives were as follows: to assess current security threats and risks to the stations; to assess the adequacy of the existing programme to protect against current threats; by comparing the security programme against those of comparable entities to establish benchmarks for good practice as a basis for improvements at Ontario Hydro. Valuable insights gained through the review are listed. These could be useful to other utilities. (UK)

  18. Hydro-Quebec's environmental policy

    International Nuclear Information System (INIS)

    1996-10-01

    Hydro-Quebec established a new environmental policy on August 1, 1996. A summary of the policy was presented. According to this policy statement the utility undertakes to recognize the environmental implications of its activities and assumes responsibilities for these implications by integrating them into its corporate decision-making processes. The following general principles and means of implementation have been highlighted: (1) sustainable development, (2) strict, responsible environmental management, (3) environmental research, (4) enhancement of activities and facilities, (5) information, consultation and dialogue, and (6) environmental responsibility of Hydro-Quebec personnel, subsidiaries and business partners

  19. Mechatronics in compressor valves - experience with HydroCOM; Mechatronik in Kompressorventilen - Betriebserfahrungen mit HydroCOM

    Energy Technology Data Exchange (ETDEWEB)

    Rumpold, A. [Hoerbiger Ventilwerke GmbH, Wien (Austria)

    2000-03-01

    Optimisation of fluid flow rates is indispensable in piston compressor operation. Messrs. Hoerbiger are producers of continuous control elements which combine mechanical and electronic components. Applications and examples of the HydroCOM control system are presented. High availability permits servicing intervals around 160,000 hours of operation. The longer operating time will improve the competitive standing of piston compressors as compared to turbocompressors and screw compressors. [German] Fuer den Betrieb von Kolbenkompressoren ist eine optimale Liefermengenregelung unverzichtbarer Bestandteil. Im Gegensatz zu herkoemmlichen Verfahren hat Hoerbiger vor zwei Jahren durch die Kombination von Mechanik und Elektronik eine neue Generation von stufenlosen Mengenregelungen auf den Markt gebracht. Anwendungsbeispiele und Betriebserfahrungen mit der HydroCOM Regelung werden vorgestellt. Hohe Verfuegbarkeit erlaubt Wartungsintervalle fuer HydroCOM Aktuatoren von ca. 16000 Betriebsstunden. Und aufgrund der generell verbesserten Standzeiten von Packungen, Kolbenringen und Ventilen erzielt der so geregelte Kolbenkompressor hohe Attraktivitaet gegenueber Turbo- und Schraubenverdichtern. (orig./AKF)

  20. Distributionally robust hydro-thermal-wind economic dispatch

    International Nuclear Information System (INIS)

    Chen, Yue; Wei, Wei; Liu, Feng; Mei, Shengwei

    2016-01-01

    Highlights: • A two-stage distributionally robust hydro-thermal-wind model is proposed. • A semi-definite programing equivalent and its algorithm are developed. • Cases that demonstrate the effectiveness of the proposed model are included. - Abstract: With the penetration of wind energy increasing, uncertainty has become a major challenge in power system dispatch. Hydro power can change rapidly and is regarded as one promising complementary energy resource to mitigate wind power fluctuation. Joint scheduling of hydro, thermal, and wind energy is attracting more and more attention nowadays. This paper proposes a distributionally robust hydro-thermal-wind economic dispatch (DR-HTW-ED) method to enhance the flexibility and reliability of power system operation. In contrast to the traditional stochastic optimization (SO) and adjustable robust optimization (ARO) method, distributionally robust optimization (DRO) method describes the uncertain wind power output by all possible probability distribution functions (PDFs) with the same mean and variance recovered from the forecast data, and optimizes the expected operation cost in the worst distribution. Traditional DRO optimized the random parameter in entire space, which is sometimes contradict to the actual situation. In this paper, we restrict the wind power uncertainty in a bounded set, and derive an equivalent semi-definite programming (SDP) for the DR-HTW-ED using S-lemma. A delayed constraint generation algorithm is suggested to solve it in a tractable manner. The proposed DR-HTW-ED is compared with the existing ARO based hydro-thermal-wind economic dispatch (AR-HTW-ED). Their respective features are shown from the perspective of computational efficiency and conservativeness of dispatch strategies.

  1. DAILY SCHEDULING OF SMALL HYDRO POWER PLANTS DISPATCH WITH MODIFIED PARTICLES SWARM OPTIMIZATION

    Directory of Open Access Journals (Sweden)

    Sinvaldo Rodrigues Moreno

    2015-04-01

    Full Text Available This paper presents a new approach for short-term hydro power scheduling of reservoirs using an algorithm-based Particle Swarm Optimization (PSO. PSO is a population-based algorithm designed to find good solutions to optimization problems, its characteristics have encouraged its adoption to tackle a variety of problems in different fields. In this paper the authors consider an optimization problem related to a daily scheduling of small hydro power dispatch. The goal is construct a feasible solution that maximize the cascade electricity production, following the environmental constraints and water balance. The paper proposes an improved Particle Swarm Optimization (PSO algorithm, which takes advantage of simplicity and facility of implementation. The algorithm was successfully applied to the optimization of the daily schedule strategies of small hydro power plants, considering maximum water utilization and all constraints related to simultaneous water uses. Extensive computational tests and comparisons with other heuristics methods showed the effectiveness of the proposed approach.

  2. Ontario Hydro statistical yearbook 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario

  3. The hydro energy; Energie hydraulique

    Energy Technology Data Exchange (ETDEWEB)

    Vachey, C.

    2000-05-01

    This paper is a first approach of the hydro energy energy. It presents the principle and the applications of this energy source. It proposes recommendations on the sizing and the cost estimation of an installation and the environmental impacts of this energy. (A.L.B.)

  4. Ontario Hydro annual report 1975

    International Nuclear Information System (INIS)

    A financial report and statistics on Ontario energy demand are presented. Efforts to secure a reliable supply of coal and uranium are described. Ontario Hydro's expansion is now controlled by capital availability and not power demand, and this has affected 11 construction projects, including heavy water plants and nuclear generating stations. (E.C.B.)

  5. Ontario Hydro annual report 1986

    International Nuclear Information System (INIS)

    1987-04-01

    Ontario Hydro's annual report of the financial position and activities for the year 1986 consists of their financial highlights; corporate profile; customer service and satisfaction; message from Chairman; message from President; 1986 in review; financial section; management report; five-year summary of financial statistics; and comparative statistics

  6. Ontario Hydro statistical yearbook 1990

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1991-12-31

    Ontario Hydro was created in 1906 by a special statute of the Province of Ontario. It is a financially self-sustaining corporation without share capital. The yearbook is a compilation of financial data detailed by financial statements and sales and revenue figures for the year 1990. It is broken down by municipalities served in Ontario.

  7. B.C. Hydro drops Duke Point

    International Nuclear Information System (INIS)

    Anon.

    2005-01-01

    The abandonment of the proposed natural gas-fired Duke Point Power Project on Vancouver Island was discussed. It was suggested that the continuing appeal process increases the risk that the plant will not be built in time. The news followed a decision by the British Columbia (BC) Court of Appeal to hear an appeal of the project by a number of intervenors. Over $170 million has been spent on the project to date. The decision will impact the BC treasury, as the amount is being deducted from the dividends that BC Hydro would have paid to the government. A coalition of individuals and environmental groups, as well as local industry, are opposed to the plant on the basis of increased greenhouse (GHG) emissions and higher natural gas prices. The project would have required a natural gas pipeline to be built under Georgia Strait. The project was thought necessary due to the deteriorating condition of high voltage direct current cables running under the strait. BC Hydro's fallback plan for the island is load reduction. A new transmission line is also planned

  8. [Ontario Hydro]. Corporate performance report, 1994

    International Nuclear Information System (INIS)

    1995-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in 1993, beginning with overall results in such areas as customer service, environmental stewardship, human resources, and finance. This is followed by reports from the Generation Business Group, Customer Services Group, Corporate Business Group, General Counsel and Secretary, Ontario Hydro Audit, Strategic Planning, Environment and Communication Group, and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix includes summary financial statements

  9. Integrated operation of hydro thermal system

    International Nuclear Information System (INIS)

    Nanthakumar, J.

    1994-01-01

    Long-term power system expansion planning studies are carried out to meet the electricity requirement in the future. Prior to the expansion planning studies, it is essential to know the energy potential of the existing generating system, especially the hydro power plants. Detailed hydro thermal stimulation studies of the integrated system is therefore carried out to determine the best way to maximise the hydro energy of the existing and committed plants. The results of the integrated system simulated model are stored in numerous files and are available for retrieval. Most important output used for expansion analysis is the energy production of each hydro plant. The annual hydro energy potential of the total hydro system of Sri Lanka for the hydrological year from 1949 to 1988 is given. Hydro condition data with different probability levels are also indicated

  10. Energy supply technologies. Hydro, ocean, wave and tidal

    Energy Technology Data Exchange (ETDEWEB)

    Fenhann, J.; Larsen, Hans [Risoe National Lab. - DTU (Denmark)

    2007-11-15

    This chapter presents an overview of current hydro, ocean, wave and tidal initiatives. Large hydro remains one of the lowest-cost generating technologies, although environmental constraints, resettlement impacts and the limited availability of sites have restricted further growth in many countries. Large hydro supplied 16 % of global electricity in 2004, down from 19 % a decade ago. Large hydro capacity totalled about 720 GW worldwide in 2004 and has grown historically at slightly more than 2 % annually. China installed nearly 8 GW of large hydro in 2004, taking the country to number one in terms of installed capacity (74 GW). With the completion of the Three Gorges Dam, China will add some 18.2 GW of hydro capacity in 2009. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic benefits of hydro include improved flood control and water supply. The socio-economic cost of hydro includes displacements and submergence. Further hydro can improve peak-capacity management. Ocean currents, some of which runs close to European coasts, carry a lot of kinetic energy. Part of this energy can be captured by sub-marine windmills and converted into electricity. These are more compact than the wind turbines used on land, simply because water is much denser than air. The main European countries with useful current power potential are France and the UK. Ocean tides are driven by the gravitational pull of the moon. With one high tide every 12 hours, a tidal power plant can operate for only four or five hours per cycle, so power from a single plant is intermittent. A suitably-designed tidal plant can, however, operate as a pimped storage system, using electricity during periods of low demand to store energy that can be recovered later. The only large, modern example of a tidal power plant is the 240 MW La Rance plant, built in France in the 1960s, which represents 91 % of the world tidal power capacity. Wave energy can be seen as

  11. The Nothuesli small hydro project

    International Nuclear Information System (INIS)

    Balachandran, S.; Jorde, K.

    2008-01-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  12. Architecture at Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  13. Ontario Hydro Research Division, 1980

    International Nuclear Information System (INIS)

    The work of the Research Division of Ontario Hydro provides technical and scientific support for the engineering and operation of a power system that includes hydraulic, fossil-fired, and nuclear generation. It also relates to the transmission and distribution of electricity and to the need to help customers use electricity with safety and economy. Among the examples of projects given are qualification of CANDU heat transport system components, pressure tube replacement, steam generator integrity, testing for earthquake resistance, and radioactive waste disposal

  14. Toronto Hydro annual report, 1992

    International Nuclear Information System (INIS)

    1993-01-01

    Toronto Hydro is the electric utility serving about 219,000 customers in Toronto, Ontario. In 1992, the utility purchased 9.6 billion kWh of electricity from Ontario Hydro, down 3.6% from 1990. Energy sales totalled 9.2 billion kWh, down 4.1% from 1990. Retail electricity rates increased an average of 6.7% in 1992, in spite of an increase in Ontario Hydro's wholesale rate by 8.2%, due to better than anticipated financial results and cost-control measures. The decline in electricity purchases and sales are attributed to economic factors, which also contributed to an increase in the utility's provision for bad debts. The third year of a 13.8-kV conversion project was completed in 1992; this project is converting the existing 4 kV distribution system to the higher voltage since maintenance and repair of the existing system is costly and the equipment is becoming less reliable. New construction, refurbishing, and modernization of equipment were performed at a number of substations. Other improvements in 1992 are reported in the areas of management and engineering systems, personnel policies, work safety, and energy management. Financial statements are included. 11 figs., 4 tabs

  15. Hydro-Quebec's buyback tariff

    International Nuclear Information System (INIS)

    Richard, J.C.

    1992-01-01

    Hydro-Quebec had an installed electric generation capacity of 25,682 MW in 1990, of which 23,927 MW was hydraulic. Of the 26 thermal power plants, 22 are in remote communities on islands or in the north part of the province. The utility's development plan predicts an annual growth in demand of 2.6% to reach ca 200 TWh in 2006; this demand would be reduced to ca 180 TWh by energy efficiency measures. To increase capacity, Hydro-Quebec can utilize the hydro generation potential of its large rivers, of which 18,000 MW is economically viable, and its small rivers. Of the 10,000 MW theoretical potential of the latter, a large fraction cannot be economically developed under existing conditions. The utility has a policy to purchase energy as a function of the price of fossil fuel. For wind energy, this price was 4.22 cents/kWh in 1991; this price will be increased annually according to the inflation index. In its isolated sites such as the Magdalen Islands, current costs of diesel-generated electricity are at least 5.5 cents/kWh. There are possibilities for installing wind plants in isolated regions but their automatic control systems need to be improved for achieving a larger utilization factor relative to diesel generation and their cost needs to be reduced. 1 tab

  16. Your energy team : Hydro Mississauga 1998 annual report

    International Nuclear Information System (INIS)

    1999-01-01

    An operational and financial review of Hydro Mississauga for fiscal year 1998 is presented. Hydro Mississauga has been serving the municipality of Mississauga, Ontario for the past 82 years. In 1998, Hydro Mississauga went through major restructuring to include a new competitive 'Services' Division which offers a wide range of competitive products and services. Despite deregulation and restructuring, quality of service was maintained and all-time performance records were set for company safety and system reliability. Operating costs were also cut and low rates continued. The residential rate freeze will be extended for a sixth straight year into 1999. Consolidated financial statements show that in 1998 Hydro Mississauga was 100 per cent debt free. One of the top priorities for the utility in 1998 was to get ready to deal with any problem that might arise as we roll over into the year 2000. The utility has completed an inventory of all computer software and equipment and has taken measures such as remediation, testing and getting vendor assurances. tabs., figs

  17. Good prospects for Portuguese small hydro industry

    International Nuclear Information System (INIS)

    Betamio de Almeida, A.; Serranho, H.

    2000-01-01

    The article outlines the history of hydro in Portugal and discusses the current position of small-scale hydro with particular reference to the Portuguese Small Hydro Association (AMPH). Encouraged by legislation, and the Valoren community programme (which defined investment incentives), many new small hydro projects sprang up in Portugal in the 1990s. In some areas of Portugal the water levels were higher than the urban centres where the water is required: how the problems of integrating power and water were addressed is described. The integration of power and irrigation schemes is also mentioned. In the wake of great expansion in the Portuguese hydro industry, there was a sharp reduction (in 1995-6) and the reasons for that are listed. The 1999 tariff was such that it is likely that small hydro will provide 3.8% of the electric power consumed nationally by 2010

  18. [Ontario Hydro International Inc.]. Annual report 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Ontario Hydro International Inc. is the international representative of Ontario Hydro. OHII operates as a global utility that markets Ontario Hydro's services and products. Its mission is to be the leader in energy efficiency and sustainable development in the international marketplace. This report describes the year's activities in the following areas: Energy management and environment, hydroelectric generation, nuclear products and services, fossil generation, grid (transmission) business, utility management, Asia Power Group Inc. The document also includes financial highlights and international and customer contracts

  19. BC hydro: Annual report, 1991-1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    The third largest electric utility in Canada, B.C. Hydro services almost 1.3 million customers in an area containing over 92 per cent of British Columbia's population. B.C. Hydro's mission is to generate, transmit and distribute electricity. This annual report covers the business and financial performance of B.C. Hydro, and financial statistics.

  20. [Ontario Hydro]. Corporate performance report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    Summarizes Ontario Hydro's corporate performance for the year, with actual results being compared against planned values established in the approved corporate financial plan and work program budget. Also includes additional indicators that illustrate noteworthy trends in corporate performance. Corporate results are reported under the new organizational structure implemented in mid-1993, beginning with overall results in such areas as customer satisfaction, electricity sales, human resources, and environmental protection. This is followed by reports from the Electricity Group (supply, generation, transmission), the Energy Services and Environment Group (load saved and shifted, non-utility generation, retail distribution), and Ontario Hydro enterprises (Ontario Hydro Technologies, Ontario Hydro International). The appendix contains summary financial statements

  1. 76 FR 67175 - Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp...

    Science.gov (United States)

    2011-10-31

    ...; 14149-000] Riverbank Hydro No. 2 LLC, Lock Hydro Friends Fund XXXVI, Arkansas Electric Cooperative Corp... Lock Hydro Friends Fund XXXVI (Lock Hydro) and on April 11, 2011, Arkansas Electric Cooperative Corp... & Dam No. 3, as directed by the Corps. Applicant Contact: Mr. Wayne F. Krouse, Hydro Green Energy, 5090...

  2. 78 FR 56224 - Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-09-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3401-049] Hydro Nelson, Ltd.; Hydro-WM, LLC; Notice of Transfer of Exemption 1. By documentation filed July 8, 2013 and supplemented... Hydro-WM, LLC. The project is located on the Rockfish River in Nelson County, Virginia. The transfer of...

  3. Hydro-Quebec proudly celebrates 50 years of service

    International Nuclear Information System (INIS)

    Anon.

    1994-01-01

    The history of the electric utility Hydro-Quebec is reviewed from its creation in 1944 as the Hydroelectric Commission of Quebec. The utility inherited an installed capacity of 696 MW and it first went about standardizing electricity supply conditions and establishing equal rates in the Montreal area. It began major construction projects in the mid-1950s with the Bersimis and Carillon hydroelectric plants. By 1962, installed capacity reached 3,657 MW. In 1963, Hydro-Quebec bought 10 private electricity distribution companies, 45 cooperatives, and a series of private or municipal systems. In 1965, the utility commissioned the world's first 735-kV transmission line. In 1967, Hydro-Quebec opened its research institute, and another laboratory specializing in electrotechnologies was opened in 1987. The 1970s were noted for the James Bay hydroelectric projects, the development of which was eventually governed by the landmark James Bay and Northern Quebec Agreement of 1975. Electricity exports greatly expanded in the 1970s and early 1980s as larger hydroelectric projects came on stream. Challenges of the 1990s include service quality, environmental issues, energy efficiency, and conservation. Hydro-Quebec's Energy Efficiency Project has a target of annual savings of 9.3 TWh by the year 2000. Energy efficiency and power system upgrading are priorities for serving future customer needs. Hydro-Quebec continues to promote hydroelectric power as the cheapest, most environmentally benign form of energy and future generating stations in progress include phase II of the LaGrande complex (to be completed 1996). 2 figs

  4. Nuclear power at Ontario Hydro

    International Nuclear Information System (INIS)

    Tapon, F.; Osborne, T.J.

    1980-01-01

    This case study shows that the diffusion of nuclear power in the electric public utility industry in Canada approximates the logistic growth curve, in agreement with previous results on technological innovation diffusion in the U.S. private sector. Many of the economic variables that affect this diffusion in the private sectors in the U.S. and Canada are also significant in the public sector in Canada. Too few utilities have adopted nuclear technology to permit using regression analysis to study the effect of environmental and regulatory factors on the growth of Ontario Hydro. Thus, cost-benefit analysis for each province might be more effective

  5. Short-term hydro-thermal scheduling using particle swarm optimization method

    International Nuclear Information System (INIS)

    Yu, Binghui; Yuan, Xiaohui; Wang, Jinwen

    2007-01-01

    The approaches based on different particle swarm optimization (PSO) techniques are applied to solve the short-term hydro-thermal scheduling problem. In the proposed methods, many constraints of the hydro-thermal system, such as power balance, water balance, reservoir volume limits and the operation limits of hydro and thermal plants, are considered. The feasibility of the proposed algorithm is demonstrated through an example system, and the results are compared with the results of a genetic algorithm and evolutionary programming approaches. The experimental results show that all the PSO algorithms have the ability to achieve nearly global solutions, but a local version of PSO with inertia weight appears to be the best amongst all the PSOs in terms of high quality solution

  6. Natural resources: adjusting and innovating - Hydro-Quebec in the global age

    International Nuclear Information System (INIS)

    Ouellet, D.

    1995-01-01

    Although it is believed that the information economy is replacing the mass economy, many companies continue to grow on economies based on natural resources. Recent aggressive growth by Hydro-Quebec in the highly competitive market for energy products was singled out as one of the success stories. Among other things, Hydro-Quebec was reported to focus attention on the globalization of electricity products, particularly in Asia, Europe and Africa. The corporation was said to cooperate with other utilities companies such as Ontario Hydro and Power Asia Assets Corporation to diversify its markets abroad. Hydro-Quebec is also marketing new products, developed in its laboratories and by subsidiaries, such as power system simulators and power system planning and management systems, on a global scale

  7. Solar constraints

    International Nuclear Information System (INIS)

    Provost, J.

    1984-01-01

    Accurate tests of the theory of stellar structure and evolution are available from the Sun's observations. The solar constraints are reviewed, with a special attention to the recent progress in observing global solar oscillations. Each constraint is sensitive to a given region of the Sun. The present solar models (standard, low Z, mixed) are discussed with respect to neutrino flux, low and high degree five-minute oscillations and low degree internal gravity modes. It appears that actually there do not exist solar models able to fully account for all the observed quantities. (Auth.)

  8. The hydro-mechanical modeling of the fractured media

    International Nuclear Information System (INIS)

    Kadiri, I.

    2002-10-01

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  9. Romanian achievement in hydro-power plants

    International Nuclear Information System (INIS)

    Cardu, M.; Bara, T.

    1998-01-01

    This paper briefly deals with the achievements relating to Hydro-electric Power Plants within the process of development of the National Power System in Romania. Also presented is the Romanian industry contribution to hydro-electrical power plant equipment manufacturing. (author)

  10. Ontario Hydro Research Division annual report 1988

    International Nuclear Information System (INIS)

    1988-01-01

    The Research Division of Ontario Hydro conducts research in the fields of chemistry, civil engineering, electrical engineering, mechanical engineering, metallurgy, and operations. Much of the research has a bearing on the safe, environmentally benign operation of Ontario Hydro's nuclear power plants. Particular emphasis has been placed on nuclear plant component aging and plant life assurance

  11. Development of Hydro-Mechanical Deep Drawing

    DEFF Research Database (Denmark)

    Zhang, Shi-Hong; Danckert, Joachim

    1998-01-01

    The hydro-mechanical deep-drawing process is reviewed in this article. The process principles and features are introduced and the developments of the hydro-mechanical deep-drawing process in process performances, in theory and in numerical simulation are described. The applications are summarized....... Some other related hydraulic forming processes are also dealt with as a comparison....

  12. Optimal control systems in hydro power plants

    International Nuclear Information System (INIS)

    Babunski, Darko L.

    2012-01-01

    The aim of the research done in this work is focused on obtaining the optimal models of hydro turbine including auxiliary equipment, analysis of governors for hydro power plants and analysis and design of optimal control laws that can be easily applicable in real hydro power plants. The methodology of the research and realization of the set goals consist of the following steps: scope of the models of hydro turbine, and their modification using experimental data; verification of analyzed models and comparison of advantages and disadvantages of analyzed models, with proposal of turbine model for design of control low; analysis of proportional-integral-derivative control with fixed parameters and gain scheduling and nonlinear control; analysis of dynamic characteristics of turbine model including control and comparison of parameters of simulated system with experimental data; design of optimal control of hydro power plant considering proposed cost function and verification of optimal control law with load rejection measured data. The hydro power plant models, including model of power grid are simulated in case of island ing and restoration after breakup and load rejection with consideration of real loading and unloading of hydro power plant. Finally, simulations provide optimal values of control parameters, stability boundaries and results easily applicable to real hydro power plants. (author)

  13. New markets for small-scale hydro

    International Nuclear Information System (INIS)

    Maurer, E.A.

    1997-01-01

    The market for small and medium sized hydro-electric power plant is more attractive than ever. The boom in Europe has increasingly spread to the emerging countries, and here too small hydro plays an important ecological role. In addition to new plant rehabilitation of 'historical' plant is now a major factor. The last few years have seen a market shift from single machine components to complete plant and systems, requiring a strategy re-think on the part of larger companies. Following the influx of private capital into the power industry, business conditions have also undergone a thorough transformation. In place of 'fast money', hydro power offers the prospect of earning longer-term, sustainable money'. The term small-scale hydro-electric power (or simply 'small hydro') is used slightly differently depending on the country and market. Here, it is used to denote plant with turbines up to 10 MW. (Author)

  14. An observational pre-post study of re-structuring Medicine inpatient teaching service: Improved continuity of care within constraint of 2011 duty hours.

    Science.gov (United States)

    Cheung, Joseph Y; Mueller, Daniel; Blum, Marissa; Ravreby, Hannah; Williams, Paul; Moyer, Darilyn; Caroline, Malka; Zack, Chad; Fisher, Susan G; Feldman, Arthur M

    2015-09-01

    Implementation of more stringent regulations on duty hours and supervision by the Accreditation Council for Graduate Medical Education in July 2011 makes it challenging to design inpatient Medicine teaching service that complies with the duty hour restrictions while optimizing continuity of patient care. To prospectively compare two inpatient Medicine teaching service structures with respect to residents' impression of continuity of patient care (primary outcome), time available for teaching, resident satisfaction and length-of-stay (secondary endpoints). Observational pre-post study. Surveys were conducted both before and after Conventional Medicine teaching service was changed to a novel model (MegaTeam). Academic General Medicine inpatient teaching service. Surveys before and after MegaTeam implementation were completed by 68.5% and 72.2% of internal medicine residents, respectively. Comparing conventional with MegaTeam, the % of residents who agreed or strongly agreed that the (i) ability to care for majority of patients from admission to discharge increased from 29.7% to 86.6% (pcare, decreases number of handoffs, provides adequate supervision and teaching of interns and medical students, increases resident overall satisfaction and decreases length-of-stay. Copyright © 2015 Elsevier Inc. All rights reserved.

  15. Hydro operational restrictions forum: Licensee workshop summary. Final report

    International Nuclear Information System (INIS)

    Ebrahim, S.; Monahan, C.K.; Pistor, B.; West, A.

    1998-08-01

    In spite of producing no atmospheric pollutants, hydroelectric power plants often go unrecognized as a unique provider of clean, efficient, low-cost energy. A concerted effort is needed to ensure that these attributes are fully accounted for when considering the uses and benefits of available water resources. Relicensing reviews and other regulatory activities associated with continued operation of hydro generation projects have drawn increased attention to hydro resources. This attention has typically resulted in imposition of conditions having a substantial cost impact without, necessarily, reflecting a full appreciation of the resource's benefits and attributes. With the extensive countrywide effort in relicensing and regulation, there is an opportunity to collect and compile lessons learned. This is particularly true with respect to preferred practices, technologies, and techniques applicable to required studies and mitigation measures. Such compilation will enable the industry and related stakeholders to improve quality and effectiveness while reducing costs of relicensing and mitigation for continued hydro operations. As a technology leader for the industry, EPRI is in a unique position to identify and document these techniques and practices. This report comprises the proceedings of the hydro licensees workshop. Fifteen licensee representatives with recent or current involvement in the relicensing process gathered at this workshop and shared their experiences, both good and bad. Support was strong among attendees for EPRI's effort to collect and compile these, along with the experiences of others, into a guidebook of accepted practices. Initial workshop findings were used in the second workshop to solicit buy-in from agencies and NGOs to the need for--as well as proposed scope of--a compendium of preferred practices

  16. Scheduling of a hydro producer considering head-dependency, price scenarios and risk-aversion

    International Nuclear Information System (INIS)

    Pousinho, H.M.I.; Mendes, V.M.F.; Catalão, J.P.S.

    2012-01-01

    Highlights: ► A MIQP approach is proposed for the short-term hydro scheduling problem. ► Head-dependency, discontinuous operating regions and discharge ramping constraints are considered. ► As new contribution to earlier studies, market uncertainty is introduced in the model via price scenarios. ► Also, risk aversion is incorporated by limiting the volatility of the expected profit through CVaR. ► A case study based on one of the main Portuguese cascaded hydro systems is provided. - Abstract: In this paper, a mixed-integer quadratic programming approach is proposed for the short-term hydro scheduling problem, considering head-dependency, discontinuous operating regions and discharge ramping constraints. As new contributions to earlier studies, market uncertainty is introduced in the model via price scenarios, and risk aversion is also incorporated by limiting the volatility of the expected profit through the conditional value-at-risk. Our approach has been applied successfully to solve a case study based on one of the main Portuguese cascaded hydro systems, requiring a negligible computational time.

  17. The constraints

    International Nuclear Information System (INIS)

    Jones, P.M.S.

    1987-01-01

    There are considerable incentives for the use of nuclear in preference to other sources for base load electricity generation in most of the developed world. These are economic, strategic, environmental and climatic. However, there are two potential constraints which could hinder the development of nuclear power to its full economic potential. These are public opinion and financial regulations which distort the nuclear economic advantage. The concerns of the anti-nuclear lobby are over safety, (especially following the Chernobyl accident), the management of radioactive waste, the potential effects of large scale exposure of the population to radiation and weapons proliferation. These are discussed. The financial constraint is over two factors, the availability of funds and the perception of cost, both of which are discussed. (U.K.)

  18. Small hydro: Policy and potential in Spain

    International Nuclear Information System (INIS)

    Gutierrez, C.

    2001-01-01

    In Spain, the benefits of small-scale (less than 10 MW) hydro are apparently rarely appreciated and there is little support from European institutions. The article suggests that small hydro technology can make a significant contribution to the country's energy requirements and create employment, provided certain obstacles can be removed. Data on the number of small hydros in Spain, and of recent installations are given; the share of hydro in Spain's total energy production is 2.5%. The low environmental impact of hydro is extolled, and the conclusions of a recent study of 'environmental impacts of the production of electricity' are listed. There are said to be unreasonable administrative obstacles; for example, it is more difficult to obtain permission to refurbish a 100 kW hydro plant in Castilla y Leon than it is to install a 30,000 kW gas plant. Some details relating to the affect of hydro on aquatic ecosystems, noise levels, and water quality, are given

  19. Hydro or the waltz of managers

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    A critique of current management and personnel problems at Hydro-Quebec was presented. With 20,000 employees and some of the world's greatest hydroelectric projects to its credit, Hydro-Quebec has historically been a source of great pride for its employees and Quebec's society. However, recent problems related to management, bureaucratization and communications within the corporation have led to important moral problems within the workforce. Management of the corporation under the newly appointed president, Andre Caille, the issue of profitability and competitiveness, the worsening morale among employees and the relationship between Hydro-Quebec and the provincial government were the principal topics discussed

  20. Proposed Hydro-Quebec development plan, 1993: Proposal

    International Nuclear Information System (INIS)

    1992-01-01

    The Quebec government now requires Hydro-Quebec to submit a development plan every three years instead of annually, in order to permit more in-depth studies and a broader consultation with interested parties. In the first of such three-year plans, a series of plan proposals is presented which was developed after a year of consultation with various groups on four fundamental matters: energy efficiency, means of generation, electro-intensive industries, and electricity exports. Options for meeting future demand at Hydro-Quebec are assessed, including the construction of new generation and transmission facilities, rehabilitation of existing facilities, improving electrical energy efficiency, and conservation strategies. These options are considered while applying the principle of sustainable development that respects the environment. Hydroelectricity will continue to be emphasized as the main source of generation since hydroelectric facilities offer distinct advantages in terms of costs, environmental impacts, and economic spinoffs. The proposed plan also presents objectives and strategies for improving the quality of service and internal operations. Financial forecasts for Hydro-Quebec are proposed which take into account the forecast changes in the utility's cost and revenue factors and its self-financing requirements. 5 figs., 15 tabs

  1. Implications of the Bangor Hydro decision on FERC relicensings

    Science.gov (United States)

    Pizzi, L.

    1997-01-01

    In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.

  2. Assessing the role of large hydro in Canada's electricity future

    International Nuclear Information System (INIS)

    Lee Pochih

    1992-01-01

    Electric power in Canada was first generated by steam in the 1880s. The use of hydroelectricity spread rapidly due to abundant water resources and the nationalization of power companies by the provinces; by 1920, 97% of Canadian electricity production came from hydroelectric plants. Thermal generation became competitive by the 1960s, when most of the best hydro sites had been developed, and nuclear generation also started gaining a share of the market. By 1991, hydroelectricity's share of Canadian power production had declined to around 60%. Hydroelectric power has long been used as an instrument of Canadian industrial policy. Given the amount and importance of utility capital expenditures, it was recognized that hydropower development could serve such policy objectives as job creation, industrial development, and macroeconomic stabilization. Creation of provincially owned utilities led to construction of large hydroelectric projects, notably in Quebec, British Columbia, Manitoba, and Newfoundland. The 20 largest hydroelectric power plants in Canada have a total installed capacity of 35,704 MW, representing ca 59% of Canada's total 1991 hydro capacity. The construction of such large projects is not expected to proceed as quickly as in the past because of environmental concerns. However, a number of factors favor continuation of development of hydro resources: a remaining potential estimated at ca 44,000 MW; simplification of electricity export regulations; more stringent air pollution standards that favor non-polluting energy sources; and a moratorium on nuclear power plants in Ontario. 4 tabs

  3. 77 FR 77070 - Black Bear Hydro Partners, LLC;

    Science.gov (United States)

    2012-12-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2727-086] Black Bear Hydro...: October 24, 2012. d. Submitted By: Black Bear Hydro Partners, LLC (Black Bear Hydro). e. Name of Project... designating Black Bear Hydro as the Commission's non-federal representative for carrying out informal...

  4. The adventure of hydroelectricity must continue

    International Nuclear Information System (INIS)

    Gravel, C.

    1997-01-01

    An interview with Andre Caille, president and CEO of Hydro-Quebec was presented. The interview focussed on the hydroelectric potential of Hydro-Quebec and open access to the American wholesale market. Hydro-Quebec has the capability to produce 160 to 170 terawatt hours of energy per year which is enough to meet all of Quebec''s needs and to export 12 to 15 per cent. According to M. Caille, research in the field of superconductivity would significantly benefit Hydro-Quebec, since the utility is responsible for 107,000 kilometers of transmission lines. If transmission line losses along those lines could be reduced, power stations could be built even farther from markets. With respect to pricing, Hydro-Quebec continues to sell electricity at regulated prices in Quebec, however, export prices to the U.S. are market driven

  5. Using project management techniques in hydro-relicensing

    International Nuclear Information System (INIS)

    Dominie, D.; Richard, J.

    1991-01-01

    This paper reports that to answer a pressing need for managing today's complex process and requirements of hydro relicensing, Central Maine Power Company has applied the principles of project management, including the use of computerized scheduling to its hydro relicensing efforts. This approach involves early inter-departmental cooperation in mapping out critical path scheduling by requiring the project team to: Outline the scope of the project in its entirety. Clarify and define components of the project. Quantify and categorize assumptions and dependencies. Identify constraints. The computer-generated schedule of this cooperative planning effort provides a graphic representation of the team's plan and become the focal point for refinements and adjustments necessary to complete an application on time. The use of project management techniques facilities team understanding of the realities and limitations in the relicensing process. These techniques encourage cooperative action, and use a solution-oriented process resulting in a product which can be a useful tool in communicating with resource agencies and regulators

  6. Hydro-power: a long history, a bright future

    Energy Technology Data Exchange (ETDEWEB)

    Deudney, D

    1981-07-01

    A brief history of the spread of hydro-power in the world was given. Tables showing hydro-power potential and use, and the % electricity from hydro-power for 13 countries were included along with a graph showing % hydro-power operating, planned and under construction by region. The need for committed and farsighted political leadership for future development and the possibility of hydro production reaching 4 to 6 times its present level were discussed.

  7. Micro Hydro-Electric Energy Generation- An Overview

    OpenAIRE

    S. O. Anaza; M. S. Abdulazeez; Y. A. Yisah; Y. O. Yusuf; B. U. Salawu; S. U. Momoh

    2017-01-01

    Energy is required now more than ever due to population growth, industrialization and modernization. Challenges such as carbon dioxide (CO2) emissions and depletion of conventional source of energy necessitate for renewable sources, of which hydro energy seems to be the most predictable. Micro-hydro which is hydro energy in a “small” scale provides electricity to small communities by converting hydro energy into electrical energy. This paper is an overview of micro-hydro system by reviewing s...

  8. Hydro energetic inventory study from Chapecozinho river

    International Nuclear Information System (INIS)

    Pimenta, S.C.; Sureck, M.A.A.; Nascimento, P.R.; Kawasaki, M.; Silva Felipe, R. da.

    1990-01-01

    The Hydro energetic Inventory Study in Chapecozinho River Basin, Brazil is described, comparing the proposed results in 1979 with the actual review in 1989. An analysis for solution the socio-economic and environment problems is also presented. (author)

  9. Emerging Market Attractiveness Index for hydro IPPs

    OpenAIRE

    Weaver, Tyson John

    2013-01-01

    This article addresses two primary commercial themes that affect the future development of the industry. 1. What are the most attractive future emerging markets for hydropower? 2. What parameters are utilized by international hydro IPPs to determine market attractiveness?

  10. Mobile units to hydro geochemistry characterization

    International Nuclear Information System (INIS)

    Gomez, P.; Martinez, B.; Turrero, M.J.

    1994-01-01

    This report shows the mobile units for hydro geochemical studies. The authors analyze the work of mobile unit and the cars that conform the unit: Sampling car and analysis car: The sampling and equipment are took into account as well

  11. Thai-Myanmar joint hydro schemes

    Energy Technology Data Exchange (ETDEWEB)

    Boonpiraks, S [Electricity Generating Authority of Thailand, Nonthaburi (Thailand)

    1992-10-01

    A brief overview is presented here of planned cooperation between Thailand and Myanmar to harness the hydro resources available along the border of the two countries. This would reduce their dependence on thermal generation. (author).

  12. Home and away with Norwegian hydro

    International Nuclear Information System (INIS)

    Jones, Simon

    2000-01-01

    Evidence of Norway's position as a world leader in terms of design and construction of hydroelectric power plant, and its position as the biggest producer of hydro in Europe, is presented. There is still some 30 TWh of hydro available for development in Norway. Statkraft is the country's biggest hydro generator: it owns and operates 54 hydro plants and has shares in a further 30. Statkraft's research has shown that there is still a large market for renewables in Europe and believes that householders are prepared to pay a premium for green energy. Statkraft trades energy with Denmark and Sweden and is believed to be planning further growth overseas. The new millennium is set to bring major changes in Norway's power industry: Hafslund and Elkem have already agreed to merge to create the country's biggest privately-owned power group

  13. Ontario hydro radioactive material transportation field guide

    International Nuclear Information System (INIS)

    Howe, W.

    1987-01-01

    The recent introduction of both the AECB Transport Packaging of Radioactive Material Regulations and Transport Canada's Transportation of Dangerous Goods Regulations have significantly altered the requirements for transporting radioactive material in Canada. Extensive additional training as well as certification of several hundred Ontario Hydro employees has been necessary to ensure compliance with the additional and revised regulatory requirements. To assist in the training of personnel, an 'active' corporate Ontario Hydro Field Guide for Radioactive Material Transport document has been developed and published. The contents of this Field Guide identify current Ontario Hydro equipment and procedures as well as the updated relevant regulatory requirements within Canada. In addition, to satisfying Ontario Hydro requirements for this type of information over two thousand of these Field Guides have been provided to key emergency response personnel throughout the province of Ontario to assist in their transportation accident response training

  14. Coanda hydro intake screen testing and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Howarth, J.

    2001-07-01

    The objective of this project has been to evaluate the effectiveness, suitability and cost benefit of the Aquashear Coanda effect, maintenance free intake screen for use in small hydro system intakes. (author)

  15. Annual report 1993 (Ontario Hydro, Toronto)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Ontario Hydro`s prime objective is to supply the people of Ontario with electricity at cost while maintaining high standards of safety and service. The annual report presents energy efficiency and competitiveness, operations in review, the environmental performance of the Corporation, the future, and choices for a sustainable future. A financial review and analysis is also provided, along with an auditor`s report and financial statements.

  16. Hydro in the Kyoto era

    International Nuclear Information System (INIS)

    Bourdon, M.-C.

    2003-01-01

    Quebec has the best performance in North America in terms of greenhouse gas (GHG) emissions. Unlike neighbouring provinces and states which rely heavily on coal for power generation, Quebec generates 96 per cent of its electricity from hydroelectric power. However, no new dams have been built in the past decade in Quebec due to land disputes with Aboriginal communities and general distrust among many ecologists. It takes about 12 years for a hydroelectric project to come to fruition. For that reason, and in order to capitalize on energy market opportunities, Hydro-Quebec is seriously considering expanding its generating capability beyond the needs of Quebec consumers, with gas-fired thermal generating stations. Environmental groups claim that the proposal to build the Suroit combined-cycle facility near the United States border destroys Quebec's efforts to honour the Kyoto Protocol. Economists argue that it is entirely in the spirit of Kyoto if exports of hydroelectricity or natural gas from Canada to the United States leads to less use of oil or coal. But one energy modeling expert at INRS-Energie et Materiaux claims that Quebec has a moral obligation to develop hydroelectricity for its own use as well as for export purposes, noting that any country with the good fortune to have renewable forms of energy, such as wind and hydro, should develop them to lower world GHG emissions. Quebec has many opportunities to sell hydroelectricity even while domestic demand grows. Hydroelectricity from Quebec should interest some states that have adopted their own GHG reduction standards, despite the U.S. government's refusal to ratify Kyoto. It should also interest Ontario and the Maritimes because they will be trying to reduce emissions from their thermal plants. The current situation does not favour the Kyoto Protocol. Exports of electricity from Quebec have dropped because no new dams have been built in recent years and gas-fired plants are looking more attractive to power

  17. Manitoba Hydro 1998 progress report

    International Nuclear Information System (INIS)

    1998-11-01

    Manitoba Hydro has four commitments: 1) they will integrate climate change management into their plans and operations, 2) between 1991 and 2012 they will reduce their greenhouse gas emissions in excess of 6% below 1990 levels, 3) they anticipate that their greenhouse gas production will be in excess of 40% below their 1990 levels by 2010-11, and 4) they have the potential to make a greater contribution to national and international environmental and economic efforts by developing additional hydroelectric energy. The performance to date in implementing their strategy since 1990 includes: the 1330 megawatt Limestone Generating Station came into full production in 1992, which has increased electricity output without additional greenhouse gas emissions; four coal fueled generating units were removed from service at Brandon Generating Station in 1996, reducing coal generating capacity; seven communities previously served have been connected to the province's provincial grid, reducing the emissions from diesel generators; demand-side energy initiatives resulted in a saving of 45 megawatts since 1990, and supply-side initiatives, 152 megawatts; and net exports have increased significantly, from 2,296 megawatt hours in 1990 to 13,888 megawatt hours in 1997-98, which displaces energy that would otherwise have been produced at fossil-fueled generating stations. tabs

  18. Hydro-thermal power flow scheduling accounting for head variations

    International Nuclear Information System (INIS)

    El-Hawary, M.E.; Ravindranath, K.M.

    1992-01-01

    In this paper the authors treat the problem of optimal economic operation of hydrothermal electric power systems with variable head hydro plants employing the power flow equations to represent the network. Newton's method is used to solve the problem for a number of test systems. A comparison with solutions with fixed head is presented. In general the optimal schedule requires higher slack bus and thermal power generation and cost in the case of variable head hydro plant than that required by the fixed head hydro plant in all demand periods. Correspondingly, the hydro generation is less in the case of variable head hydro plant compared to fixed head hydro plant. A negligible difference in voltage magnitudes in all the time intervals, but it is observed that slightly higher voltages occur in the case of the fixed head hydro plant. Higher power and energy losses occur in the case of variable head hydro plants compared to the fixed head hydro plants

  19. Hydro-plankton characteristics and their relationship with sardine and anchovy distributions on the French shelf of the Bay of Biscay

    Directory of Open Access Journals (Sweden)

    Pierre Petitgas

    2006-06-01

    Full Text Available The spatial pattern in hydro-plankton and fish distributions and their relationship were analysed based on the spring 2000 fisheries acoustic survey. The importance of this survey was that it was a multi-disciplinary platform which collected an extensive set of parameters in the hydro-plankton leading to a potentially finer description of hydro-plankton conditions and fish habitats. More than 50 variables were measured on a grid of stations, in four compartments of the ecosystem: hydrology, nutrients, primary producers and meso-zooplankton. First, a joint analysis of all hydro-plankton compartments was performed using multiple factor analysis (MFA. The method was used to estimate a compromise factorial space common to all compartments in which the stations were grouped by hierarchical clustering. The groups were represented spatially and a strong spatial pattern was evidenced. The fish and their spawned eggs were sampled along transect lines using acoustics and CUFES (continuous underway fish egg samplers. The distribution of the fish and their eggs was analysed in relation to the hydro-plankton groups of stations and difference in fish density across hydro-plankton conditions was tested by a pair-wise multiple comparison procedure. Anchovy was associated with a lesser number of hydro-plankton conditions than sardine. Eggs of both species were also associated with a lesser number of conditions than the fish. Finally, the gain provided by using the extensive set of hydro-plankton parameters for mapping large-scale hydro-plankton conditions was analysed in comparison with the situation in which a small set of parameters was available. The extensive set of parameters allowed more hydro-plankton conditions to be identified but only in the coastal area and not on the shelf. Size fractionated chlorophyll was determinant for tracking river plume hydro-plankton condition. However, the fish did not respond to the variety of the coastal hydro

  20. A comparison of the aquatic impacts of large hydro and small hydro projects

    Science.gov (United States)

    Taylor, Lara A.

    The expansion of small hydro development in British Columbia has raised concerns surrounding the effects of these projects, and the provincial government's decision to proceed with Site C has brought attention to the impacts of large hydro. Together, these decisions highlight that there are impacts associated with all energy development. My study examines the aquatic effects of large and small hydro projects using two case study sites: Site C and the Upper Harrison Water Power Project. I first determine the aquatic effects of each of the case study sites. Next, I use existing literature and benefits transfer to determine the monetary value of these effects. My results suggest that, with mitigation, small hydro projects have less of an effect on the environment than a large hydro project per unit of electricity. I also describe the implications of my study in the context of current British Columbia energy policy. Keywords: hydropower; aquatic effects. Subject Terms: environmental impact assessment; benefits transfer.

  1. BC Hydro's integrated resource planning : the 2004 IEP and beyond

    International Nuclear Information System (INIS)

    Soulsby, R.

    2004-01-01

    An outline of BC Hydro Integrated Electricity Plan (IEP) was presented in this paper, along with details of its environmental, social and business performance and statistics of its net income and revenue for 2003-2004. The IEP was created to match long term load to supply in the most cost-effective way and is also the basis for resource acquisition plans. In addition, the IEP models performance of portfolios of resources on a system-wide basis, considers uncertainties through sensitivity analysis and measures and evaluates multiple attributes from various portfolios. A flow chart of processes informed by the IEP was presented. Guiding principles behind the creation of the plan include low electricity rates and public ownership; secure, reliable supply; private sector development; environmental responsibility, with no nuclear power sources; ensuring energy self-sufficiency; and maintaining a balanced portfolio of resources. A pie chart of BC Hydro's current portfolio mix was presented as well as a supply and demand outlook and details of plans and new capacity resources required before 2013. Various resource options were presented. Key outcomes of First Nations and stakeholder engagement include the acceptance of BC Hydro as a sustainable energy company; a desire for higher priority on reliability and low cost; an agreement over the Power Smart 10 year plan; a general agreement that the current, balanced approach to resource acquisition was appropriate; and a desire for more rate options. There was an assurance that BC Hydro would continue to engage First Nations and stakeholders in integrated electricity planning. Other outcomes included requests for more information about outage and outage planning and process improvements; support to maintain low rates; a preference for maximizing use of existing facilities; support for wood waste cogeneration. A broad range of options were reviewed, but no superior portfolio was identified within the parameters of this paper

  2. Climate impact on BC Hydro's water resources

    International Nuclear Information System (INIS)

    Smith, D.; Rodenhuis, D.

    2008-01-01

    BC Hydro like many other hydro utilities has used the historical record of weather and runoff as the standard description the variability and uncertainty of the key weather drivers for its operation and planning studies. It has been conveniently assumed that this historical record is or has been statistically stationary and therefore is assumed to represent the future characteristics of climatic drivers on our system. This assumption is obviously no longer justifiable. To address the characterisation of future weather, BC Hydro has a multi-year a directed research program with the Pacific Climate Impacts Consortium to evaluate the impacts of climate change on the water resources that BC Hydro manages for hydropower generation and other uses. The objective of this program is to derive climate change adjusted meteorologic and hydrologic sequences suitable for use in system operations and planning studies. These climate-adjusted sequences then can be used to test system sensitivity to climate change scenarios relative to the baseline of the historical record. This paper describes BC Hydro's research program and the results achieved so far. (author)

  3. BC Hydro shops for GHG offsets

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    BC Hydro is reported to have offered to purchase one million tonnes of carbon dioxide reductions in Canada's Greenhouse Gas Emissions Reduction Trading program (GERT). The program uses a baseline and credit system, where emitters purchase measurable quantities of site-specific GHG reductions. Since mid-1998, the program registered five bilateral trades and seven offers to sell. BC Hydro's recent offer is the first offer to buy. BC Hydro has made the offer to buy in expectation of the introduction of the start of the Kyoto Protocol reductions, and expects to be in the game for some time to come if it is to meet its obligations under the Kyoto Protocol. Preference will be given to projects located in Canada, but BC Hydro will consider reductions created anywhere in the world. The financial range of a single trade is between $50,000 and $1 million. (GHG offsets are currently trading in North America for between $.50 and $3.00 Cdn per metric tonne of carbon dioxide equivalent.) At present, offsets are selling at a heavily discounted price because of the uncertainty that investments made now will be credited against future regulations curbing emitters. Consequently, buying now while prices are low, may lead to sizable benefits later, depending on the actual regulations when they are promulgated. Trading now will also give BC Hydro greater credibility and assurance to have its voice heard when discussions about emissions trading and the implementation of emission trading rules reaches the serious stage

  4. Higher profits, lower bills : a new electricity strategy for Hydro-Quebec

    International Nuclear Information System (INIS)

    2010-01-01

    Quebec is the fourth largest producer of hydro-electricity in the world, and has among the lowest electricity rates in North America. In 2008, 89 percent of the electricity produced by Hydro-Quebec was sold in the province, and the remainder was exported. In 2009, the electric utility released its strategic plan for 2009 to 2013. Hydro-Quebec's net profits are forecast to decline by 24 percent by 2013 and electricity rates are forecast to rise by 8.5 percent. Since Hydro-Quebec has already developed all of the province's low-cost hydroelectric resources, it can no longer increase profits and lower rates by building new hydropower production stations. In order to continue to prosper, the utility will invest in energy efficiency and better coordination of its power system with Ontario's. Increased electricity exports from Hydro-Quebec will help both Ontario and the United States reduce their greenhouse gas emissions by displacing fossil power generation. 25 refs., 2 tabs., 3 figs.

  5. Development of Manitoba Hydro's public water safety around dams management guidelines

    Energy Technology Data Exchange (ETDEWEB)

    Bonin, Dave; McPhail, Gord; Murphy, Shayla; Schellenberg, Gord [KGS Acres, Winnipeg, (Canada); Read, Nick [Manitoba Hydro, Winnipeg, (Canada)

    2010-07-01

    Several drowning fatalities and safety incidents have occurred around dams in Ontario, Manitoba and other jurisdictions in Canada. Following these incidents, Manitoba Hydro implemented several measures to improve public safety around its dams with the development of a warning signs manual. Manitoba Hydro found that a standard centralized approach to the process of improving public safety is better for ensuring compliance and consistency, even though they have safety measures in place. This paper described the process that Manitoba Hydro has followed in developing a formal set of public water safety around dams (PWSD) guidelines and a program for implementing these guidelines. This program was developed with the intent of providing a high standard of public protection and continuous improvement and monitoring on par with the effect spent on similar dam safety type programs. This paper focused on the development of the pilot PWSD management plan for Pine Falls generating station in order to test the effectiveness and usability of the guidelines.

  6. Liquid assets: factors contributing to the development of small hydro in China

    International Nuclear Information System (INIS)

    Pan, D.

    2006-01-01

    The rapid growth of small hydro capacity in China is reviewed. At present, the annual generation from rural small hydropower in China equates with the saving of 44 million tonnes of coal, or the emission of 110 million tonnes of carbon dioxide. Other environmental advantages such as a reduction in wood burning, reduced logging and therefore reduced soil erosion, are mentioned. Energy-starved China stood to gain much from the development of small hydro systems and government policy has been supportive in terms of relatively low tax rates and low interest loans. It is expected that due to the rapid economic growth in China, small-scale hydro will maintain its present level of development and continue to be promoted in a sound and rational manner. (author)

  7. Development of HydroImage, A User Friendly Hydrogeophysical Characterization Software

    Energy Technology Data Exchange (ETDEWEB)

    Mok, Chin Man [GSI Environmental; Hubbard, Susan [Lawrence Berkeley National Laboratory; Chen, Jinsong [Lawrence Berkeley National Laboratory; Suribhatla, Raghu [AMEC E& I; Kaback, Dawn Samara [AMEC E& I

    2014-01-29

    HydroImage, user friendly software that utilizes high-resolution geophysical data for estimating hydrogeological parameters in subsurface strate, was developed under this grant. HydroImage runs on a personal computer platform to promote broad use by hydrogeologists to further understanding of subsurface processes that govern contaminant fate, transport, and remediation. The unique software provides estimates of hydrogeological properties over continuous volumes of the subsurface, whereas previous approaches only allow estimation of point locations. thus, this unique tool can be used to significantly enhance site conceptual models and improve design and operation of remediation systems. The HydroImage technical approach uses statistical models to integrate geophysical data with borehole geological data and hydrological measurements to produce hydrogeological parameter estimates as 2-D or 3-D images.

  8. Public safety for BC Hydro's dams and powerhouse

    Energy Technology Data Exchange (ETDEWEB)

    Cattanach, D. [BC Hydro, Burnaby, BC (Canada). Emergency Preparedness Security and Public Safety

    2009-07-01

    This presentation reviewed public safety and historical practices at British Columbia (BC) Hydro. Historically, visitors were guided to safe locations at their facilities by visitor centres and public use management areas. Fences and booms were used to protect visitors from the more dangerous areas around the facility. This presentation also described the features of the safety management plans that BC Hydro has in place for each of its 41 facilities. The safety management plans are approved by the plant managers; they have common controls such as fences and signs; and there are excellent maps defining the danger areas. New risks that were identified were also presented. The next steps for BC Hydro include test driving the draft Canadian Dam Association guidelines for the Aberfeldie Dam; a new powerhouse to reduce overtopping of the dam during the spring; and continuing with public safety hazards and controls such as bow-ties. figs.

  9. Revitalizing the nuclear business at Ontario Hydro

    International Nuclear Information System (INIS)

    Talbot, K.

    1994-01-01

    Ontario Hydro, North America's largest electric power utility, with an installed capacity of 34,000 MW, has under gone a major restructuring over the past year to better align itself with a changing electricity market and evolving customer needs. The single largest new business unit within the new Ontario Hydro is Ontario Hydro Nuclear (OHN), responsible for engineering, operation and maintenance of the Corporation's 20 large nuclear units at three generating sites, OHN faces a significant challenge in returning Ontario's nuclear units to the world-leading performance levels they enjoyed in the past, particularly the older Pickering A and Bruce A plants. However, steady progress is being made as evidenced by improving peer reviews and overall capacity and financial performance

  10. Collision data involving hydro-carbon molecules

    International Nuclear Information System (INIS)

    Tawara, H.; Itikawa, Y.; Nishimura, H.; Tanaka, H.; Nakamura, Y.

    1990-07-01

    Hydro-carbon molecules are abundantly produced when graphites are used as internal wall materials of hydrogen plasmas and strongly influence properties of low temperature plasmas near the edges as well as those of high temperature plasmas at the center. In this report, following simple description of the production mechanisms of hydro-carbon molecules under the interactions between graphite and hydrogen plasma, the present status of collision data for hydro-carbon molecules by electron impact is discussed and the relevant data are summarized in a series of figures and tables. It should also be noted that, in addition to fusion plasmas, these hydrocarbon data compiled here are quite useful in other applications such as plasma chemistry and material processing. (author)

  11. BC Hydro triple bottom line report 2002

    International Nuclear Information System (INIS)

    Anon

    2002-08-01

    British Columbia Hydro (BC Hydro) published this document which measures the environmental, social and economic performance of the company. It is a complement to BC Hydro's 2002 Annual Report. The report was prepared to better understand the company's business in terms of its commitment to being an environmentally, socially, and economically responsible company (the three bottom lines). BC Hydro proved its ability to integrate the three bottom lines in decision making processes by carefully examining the environmental, social and economical impacts of programs such as Power Smart, Green and Alternative Energy, and Water Use Planning. All indicators point to BC Hydro achieving its commitment of providing a minimum of 10 per cent of new demand through 2010 with new green energy sources. Water Use Plans were developed for hydroelectric generating stations, and they should all be in place by 2003. Efficiencies realised through the Power Smart program offset the increases in greenhouse gas associated with increased energy demand. Juvenile sturgeon raised in a hatchery were released into the Columbia River in May 2002. The completion of a 40-kilometre trail on the Sunshine Coast was helped by a financial contribution from BC Hydro in the amount of 23,000 dollars. Safety improvements were implemented at eight facilities, such as dam remediation, dam surveillance and instrumentation updates. Scholarships were awarded across the province, along with additional donations to non-profit organizations. Co-op positions were provided for 150 students. Internal energy efficiency programs were successful. Planning is under way for significant maintenance work and equipment replacement projects as the transmission and distribution infrastructure ages. The number of reported indicators was expanded this year. In turn, they were aligned with the revised Global Reporting Initiative (GRI) guidelines. tabs

  12. An extended NSGA-III for solution multi-objective hydro-thermal-wind scheduling considering wind power cost

    International Nuclear Information System (INIS)

    Yuan, Xiaohui; Tian, Hao; Yuan, Yanbin; Huang, Yuehua; Ikram, Rana M.

    2015-01-01

    Highlights: • Multi-objective hydro-thermal-wind scheduling model (MO-HTWS) is establish. • The extra cost in MO-HTWS problem caused by wind uncertainty is considered. • An extended NSGA-III is proposed to solve MO-HTWS problem. • Constraint handling strategies are presented to modify infeasible solutions. • The feasibility and effectiveness of the proposed method is verified by example. - Abstract: Due to the characteristics of clean and renewable, wind power is significant to economic and environmental operation of electric power system so that it attracts more and more attention from researchers. This paper integrates wind power with hydrothermal scheduling to establish multi-objective economic emission hydro-thermal-wind scheduling problem (MO-HTWS) model with considering wind uncertain cost. To solve MO-HTWS problem with various complicated constraints, this paper extends NSGA-III by introducing the dominance relationship criterion based on constraint violation to select new generation. Moreover, the constraint handling strategy which repairs the infeasible solutions by modifying the decision variables in feasible zone according to the violation amount is proposed. Finally, a daily scheduling example of hydro-thermal-wind system is used to test the ability of NSGA-III for solving MO-HTWS problem. It is concluded from the superior quality and good distribution of the Pareto optimal solutions that, NSGA-III can offer an efficient alternative for optimizing MO-HTWS problem

  13. Alexela ostab Hydro Texaco tanklaketi / Gert D. Hankewitz

    Index Scriptorium Estoniae

    Hankewitz, Gert D.

    2006-01-01

    Kütusefirma Alexela Oil teatas, et ostab tanklaketi Hydro Texaco kõik Balti riikide tanklad. Diagramm: Alexela ja Hydro Texaco majandusnäitajad. Vt. samas: Statoili juht: ühinemine turul muutusi ei too

  14. B.C. Hydro : 1997 annual report

    International Nuclear Information System (INIS)

    1997-01-01

    Operating and financial information from B.C. Hydro for 1997 is presented. B.C. Hydro is the third largest electric utility in Canada. The utility generates between 43,000 and 54,000 gigawatt-hours of electricity annually. More than 80 per cent of the electricity is produced by major hydroelectric generating stations on the Columbia and Peace rivers. This report presents a picture of improved financial performance, details of all revenues and expenditures and capsule summaries of the Utility's operations. The report also addresses issues regarding strategic direction, local and international competition, and consultation and regulatory activities. tabs. and figs

  15. Application of reliability methods in Ontario Hydro

    International Nuclear Information System (INIS)

    Jeppesen, R.; Ravishankar, T.J.

    1985-01-01

    Ontario Hydro have established a reliability program in support of its substantial nuclear program. Application of the reliability program to achieve both production and safety goals is described. The value of such a reliability program is evident in the record of Ontario Hydro's operating nuclear stations. The factors which have contributed to the success of the reliability program are identified as line management's commitment to reliability; selective and judicious application of reliability methods; establishing performance goals and monitoring the in-service performance; and collection, distribution, review and utilization of performance information to facilitate cost-effective achievement of goals and improvements. (orig.)

  16. Navigating the hydro market in Latin America

    International Nuclear Information System (INIS)

    Yermoli, C.A.

    1995-01-01

    The governments of most Latin American countries have yet to establish clear policies about the future ownership of existing generation assets, but they do expect future capacity to be largely developed by the private sector. There were at one time plans for many government-financed hydro projects in the area, but these projects produced much paper and little electricity. Present trends will take the area toward independent power projects, both hydro projects and thermal power projects. This article is a review of those present trends

  17. Margins for uncertainties in Hydro-Quebec's short-term operations planning

    International Nuclear Information System (INIS)

    Beaumont, M.; Raymond, M.P.

    1995-01-01

    A method developed by Hydro-Quebec for establishing the short-term capacity margin requirements for dealing with uncertainties from 1 to 24 hours in advance, was presented. Hydro-Quebec's generating system and characterization of the problems associated with meeting load requirements were discussed. Factors accounted for included those concerning internal load forecast, unit forced outages, risks of not meeting firm load, risks of not meeting real-time reserves requirements, costs, time delays, and operating constraints of non-hydraulic resources. Each of these were described in detail, and methods for combining mathematical uncertainties were presented. Procedures used for selecting an appropriate risk level and building a margin policy were described. Improvements for more accurate modelling were discussed. 5 refs., 2 tabs., 5 figs

  18. A Novel Pumped Hydro Combined with Compressed Air Energy Storage System

    Directory of Open Access Journals (Sweden)

    Erren Yao

    2013-03-01

    Full Text Available A novel pumped hydro combined with compressed air energy storage (PHCA system is proposed in this paper to resolve the problems of bulk energy storage in the wind power generation industry over an area in China, which is characterised by drought and water shortages. Thermodynamic analysis of the energy storage system, which focuses on the pre-set pressure, storage volume capacity, water air volume ratio, pump performance, and water turbine performance of the storage system, is also presented. This paper discovers how such parameters affect the performance of the whole system. The ideal performance of this novel system has the following advantages: a simple, highly effective and low cost structure, which is comparable to the efficiency of a traditional pumped hydro storage system. Research results show a great solution to the current storage constraints encountered in the development of the wind power industry in China, which have been widely recognised as a bottleneck in the wind energy storage industry.

  19. The future role of hydro-electricity in Sub-Saharan Africa

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1989-01-01

    Hydroelectric power currently supplies 56-93% of the electricity requirements of the different geographic areas of Sub-Saharan Africa and accounted for 73% of total requirements in 1980. The continent is richly endowed with hydro resources in all areas, with central Africa possessing the most abundant reserves. Existing installed hydro capacity is 13,500 MW and of the total technical resource of 290,000 MW, some 110,000 MW are estimated to constitute the potential that warrants investigation. The demand for electricity in the region is presently low and growing at 5-10%/y. It is projected to double from 47,000 GWh in 1980 to 110,000-170,000 GWh by the year 2000, and is likely to double again by 2020. Hydro reserves warranting investigation exceed the demand projected for the year 2000 by a ratio of over 3:1 and only 13 countries out of 36 have a ratio less than one. A large proportion of these reserves are estimated to be economic to develop relative to other means of power generation. The development of hydro resources should maintain the proportion of the demand met by hydro in the range of 60-75% well into the 21st century. The existing installed capacity is likely to be increased at the rate of 3,000-5,000 MW per decade to achieve this. Constraints on such increase include the large amounts of capital needed, environmental issues, the need to displace populations affected by flooding, and fluctuations in the oil price which make long-term planning uncertain. 5 refs., 1 fig., 11 tabs

  20. Optimal scheduling for distributed hybrid system with pumped hydro storage

    International Nuclear Information System (INIS)

    Kusakana, Kanzumba

    2016-01-01

    Highlights: • Pumped hydro storage is proposed for isolated hybrid PV–Wind–Diesel systems. • Optimal control is developed to dispatch power flow economically. • A case study is conducted using the model for an isolated load. • Effects of seasons on the system’s optimal scheduling are examined through simulation. - Abstract: Photovoltaic and wind power generations are currently seen as sustainable options of in rural electrification, particularly in standalone applications. However the variable character of solar and wind resources as well as the variable load demand prevent these generation systems from being totally reliable without suitable energy storage system. Several research works have been conducted on the use of photovoltaic and wind systems in rural electrification; however most of these works have not considered other ways of storing energy except for conventional battery storage systems. In this paper, an energy dispatch model that satisfies the load demand, taking into account the intermittent nature of the solar and wind energy sources and variations in demand, is presented for a hybrid system consisting of a photovoltaic unit, a wind unit, a pumped hydro storage system and a diesel generator. The main purpose of the developed model is to minimize the hybrid system’s operation cost while optimizing the system’s power flow considering the different component’s operational constraints. The simulations have been performed using “fmincon” implemented in Matlab. The model have been applied to two test examples; the simulation results are analyzed and compared to the case where the diesel generator is used alone to supply the given load demand. The results show that using the developed control model for the proposed hybrid system, fuel saving can be achieved compared to the case where the diesel is used alone to supply the same load patters.

  1. Design concept of Hydro cascade control system

    International Nuclear Information System (INIS)

    Fustik, Vangel; Kiteva, Nevenka

    2006-01-01

    In this paper a design concept of the comple hydro cascade scheme is presented with the design parameters of the main technical features. The cascade control system architecture is designed considering up-to-date communication and information technology. The control algorithm is based on Pond Level Control and Economic Load Allocation concepts.

  2. Ontario Hydro's plan for used nuclear fuel

    International Nuclear Information System (INIS)

    Stevens-Guille, P.D.; Howes, H.A.; Freire-Canosa, J.

    1992-01-01

    A comprehensive plan for the management of used nuclear fuel has been published by Ontario Hydro. In this paper current practices are discussed and actions leading to disposal in a repository are outlined. Extended storage options are discussed should disposal be delayed

  3. Using historic earnings to value hydro energy

    International Nuclear Information System (INIS)

    Robson, I.A.; Whittington, H.W.

    1993-01-01

    This article briefly presents a technique for assigning a value to the water held in and removed from the hydro reservoir. Using historic earnings as the basis for a series of equations, it aims to give engineers trading energy a reliable means of placing a value on what is effectively a ''free'' resource. (Author)

  4. Resettlement associated with hydro projects in China

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The flow rates of Chinese rivers are subject to major seasonal fluctuations, and as a result large reservoirs have to be constructed for flood control, irrigation, and power generation. As most of the river valleys are densely populated, the relocation and resettlement of people from the reservoir areas are major but unavoidable problems to be addressed in building hydro projects in China. (author)

  5. IPPSO raises Hydro exports in smog negotiations

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The Independent Power Producers of Ontario (IPPSO) requested federal and provincial committees negotiating atmospheric emission standards to review Ontario Hydro's export wheeling plans. IPPSO alleges that Ontario Hydro is preparing to apply pressure on the Canadian export approval process, and is building up a major effort that will increase emissions, contrary to the objectives embodied in a number of environment protection projects such as the Ontario Smog Plan, The Federal-Provincial NOx Management Plan, the Strategic Options Plan, or the Convention on Long-Range Transboundary Air Pollution Draft NOx Protocol Negotiations. IPPSO alleges further that while Ontario Hydro is one of Canada's largest single emitter of greenhouse gases NOx, and SO 2 , and as a public sector corporation it should be the most amenable to serving the public good, the Corporation is doing exactly the opposite: it actively prevents production of electricity from less polluting sources. It is IPPSO's contention that Ontario Hydro's desire to control the Ontario market could come at significant cost to the environment

  6. Analyze the factors effecting the development of hydro power projects in hydro rich regions of India

    Directory of Open Access Journals (Sweden)

    Ameesh Kumar Sharma

    2016-09-01

    Full Text Available Power is considered as the major back bone for all the nations throughout the world including India on the basis of which development of the country depends. If a country has the resources to generate the power at competitive price in that case the people of the country get the benefits in terms of improvement in their social and economical life. When we talk about India, various locations in the country where still there is no electricity people are living in dark without having the access of the modern technology. The total hydro power potential of India is 1, 50,000 MW out of this total hydro potential only 40,195 MW is exploited till 2014. More than 80% of the total hydro potential of the country is lying in the western Himalayan states (Jammu and Kashmir, Himachal Pradesh, Uttrakhand and Arunachal Pradesh. Small hydro projects are also playing a very important role in the modern world for the development of the remote areas which are not main grid connected specially in western Himalayan region of India. India has a total potential 19,749 MW of small hydro projects and of this total potential only 3990.9 MW harnessed till 2014. Ministry of new and renewable energy in India is also providing special incentives to hydro rich states of India. In this research article we are taken the case study of the small hydro projects in the western Himalayan region because theses states are having vast small hydro potential which is still needed to be harnessed. So, it is very important to identify the factors which are effecting the development of these small ventures especially in western Himalayan region in India.

  7. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  8. Intertemporal consumption and credit constraints

    DEFF Research Database (Denmark)

    Leth-Petersen, Søren

    2010-01-01

    There is continuing controversy over the importance of credit constraints. This paper investigates whether total household expenditure and debt is affected by an exogenous increase in access to credit provided by a credit market reform that enabled Danish house owners to use housing equity...

  9. Short-term hydro generation scheduling of Xiluodu and Xiangjiaba cascade hydropower stations using improved binary-real coded bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Lu, Peng; Zhou, Jianzhong; Wang, Chao; Qiao, Qi; Mo, Li

    2015-01-01

    Highlights: • STHGS problem is decomposed into two parallel sub-problems of UC and ELD. • Binary coded BCO is used to solve UC sub-problem with 0–1 discrete variables. • Real coded BCO is used to solve ELD sub-problem with continuous variables. • Some heuristic repairing strategies are designed to handle various constraints. • The STHGS of Xiluodu and Xiangjiaba cascade stations is solved by IB-RBCO. - Abstract: Short-term hydro generation scheduling (STHGS) of cascade hydropower stations is a typical nonlinear mixed integer optimization problem to minimize the total water consumption while simultaneously meeting the grid requirements and other hydraulic and electrical constraints. In this paper, STHGS problem is decomposed into two parallel sub-problems of unit commitment (UC) and economic load dispatch (ELD), and the methodology of improved binary-real coded bee colony optimization (IB-RBCO) algorithm is proposed to solve them. Firstly, the improved binary coded BCO is used to solve the UC sub-problem with 0–1 discrete variables, and the heuristic repairing strategy for unit state constrains is applied to generate the feasible unit commitment schedule. Then, the improved real coded BCO is used to solve the ELD sub-problem with continuous variables, and an effective method is introduced to handle various unit operation constraints. Especially, the new updating strategy of DE/best/2/bin method with dynamic parameter control mechanism is applied to real coded BCO to improve the search ability of IB-RBCO. Finally, to verify the feasibility and effectiveness of the proposed IB-RBCO method, it is applied to solve the STHGS problem of Xiluodu and Xiangjiaba cascaded hydropower stations, and the simulating results are compared with other intelligence algorithms. The simulation results demonstrate that the proposed IB-RBCO method can get higher-quality solutions with less water consumption and shorter calculating time when facing the complex STHGS problem

  10. Ontario Hydro annual report, 1988

    International Nuclear Information System (INIS)

    1989-04-01

    Ontario continues a strong growth in electricity consumption; over the past five years consumption has risen an average of 5 percent a year. In 1988 consumption rose by 6.5 percent to 133.1 billion kilowatt-hours. Peak demand was 23 million kilowatts. The top priority for the 1990s will be improving the energy efficiency of customers and the operating efficiency of the Corporation, with a target saving of 4500 megawatts through demand management and energy efficiency by the year 2000. A new environmental division has been formed, as well as a division for non-utility generation. Safety is of particular importance to the Nuclear Generating Division; in all nuclear operations, after 143 million hours worked from 1955 to 1988, there has never been a work-related fatality or a detectable injury due to radiation. The average radiation dose per worker continues to decline and is now under 10 percent of the legal dose limit. Retubing of Pickering Nuclear Generating Station unit 2 has been completed. Retubing of unit 1 is under way, and work on units 3 and 4 has been approved. Construction continues on the Darlington Nuclear Generating Station, where the first unit is expected to go into service in 1989. The Darlington Tritium Removal Facility was completed

  11. Ontario Hydro 1982 annual report

    International Nuclear Information System (INIS)

    1983-05-01

    Due to the economic recession, primary electrical energy demand for the year failed to exceed that of the previous year for the first time since 1944. Actual demand was 100.8 billion kWh, 0.8 per cent below 1981. However, annual peak demand reached 18.1 million kW on January 18, an all-time high, and 5.4 per cent over January 1981. There were 104.1 billion kWh of electricity generated during the year, nearly equally from nuclear, coal, and water power. Nuclear generating units continued their outstanding performance. Bruce-3 completed a 494-day run at continuous power. NPD Generating Station celebrated 20 years of operation. Pickering B unit 5 started up and produced its first power. At Bruce A, a remote-controlled vehicle was used to remove damaged fuel to a shielded flask, completing the job in a short time with low staff radiation exposure. Bruce B construction progressed on schedule; while at Darlington, design and construction continued at a high level, with 1700 workers on site at year-end. Actual net income was $348 million, $38 million below forecast. Coal deliveries were 13.4 million Mg (23 per cent over 1981). Nuclear fuel deliveries to generating stations were 996 Mg (3 per cent over 1981). Agreements were negotiated for the supply of 5200 Mg of uranium concentrates during 1985-93. Nuclear fuel manufacturing contracts were awarded at lower prices than previously attained. Income totalling $163 million from electricity exports to the U.S.A. reduced overall cost of providing electricity to Ontario customers by 5.1 per cent. The Residential Energy Advisory Program surveyed 16,000 homeowners wishing to improve home energy efficiency. There were 20,000 residential customers who received grants to convert from oil to electric heating. Additional consumption resulting from these conversions is estimated at 280 million kWh

  12. Provincial panel: addressing emerging energy constraints and new strategies to meet future generation demand

    International Nuclear Information System (INIS)

    Clarkson, J.

    2006-01-01

    This paper addresses emerging energy constraints and new strategies to meet future generation demand in the Province of Manitoba. The focus is to reduce reliance on energy sources that emit greenhouse gases such as petroleum, natural gas and coal, and increase clean and green electricity. The current plan is to double hydro generation, achieve 1000 MW wind power and utilize bio energy

  13. The Grossmatt hydro-power station

    International Nuclear Information System (INIS)

    Hintermann, M.

    2006-01-01

    This final report for the Swiss Federal Office of Energy (SFOE) presents the project for a small hydropower station on the Birs river in north-western Switzerland. The report reviews the history of the project, in which a new 385 kW-hydro-power station at the site of an earlier installation is foreseen. Details are presented on the investigations made and on the co-ordination with the owners of the hydro-power station situated up-river, the local power utility and the local authorities. Also, the requirements placed on the project by the fishing authorities are quoted and the solution foreseen is described. Also discussed are the requirements placed on the project by legislation on environmental impact and flood protection. Figures on electrical energy production and building costs are presented

  14. Hydro Ottawa achieves Smart Meter milestone

    International Nuclear Information System (INIS)

    Anon.

    2008-01-01

    As Ontario's second largest municipal electricity company, Hydro Ottawa serves more than 285,000 residential and business customers in the city of Ottawa and the village of Casselman. Since 2006, the utility has installed more than 230,000 Smart Meters throughout its service territory in an effort to provide better services to its customers. This initiative represents the largest operational advanced metering infrastructure network in Canada. This move was necessary before time-of-use rates can be implemented in Ottawa. The Smart Meters deliver data wirelessly to Hydro Ottawa's Customer Information System for billing and eliminating manual readings. The Smart Meters are designed to promote more efficient use of electricity. The Government of Ontario has passed legislation requiring the installation of Smart Meters throughout the province by the end of 2010

  15. Small hydro generation building block profile

    International Nuclear Information System (INIS)

    2003-01-01

    Concise business information on small hydro generation in British Columbia was presented in this document. It was noted that the steep terrain within the province and its abundant precipitation provides numerous opportunities for hydropower generation in British Columbia. The hydroelectric sector produces approximately 90 per cent of the electrical demand in the province. The document focusses on small hydro sites producing between 0.5 and 50 mega watts (MW) and not having large water storage. In the first section, an overview of the electricity sector in the province is provided. The following issues are examined in subsequent sections: land resources; infrastructure requirements; sales market; labour market; the regulatory regime; development factors; non-governmental aspects; investments and economics; the present status and future outlook of the industry; and, government revenue. Input-output tables were also provided. 22 refs., 5 tabs., 4 figs

  16. Sinkhole investigated at B.C. Hydro's Bennett Dam

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    The cause of a sinkhole which appeared in a roadway crossing an earth filled dam in B. C., was discussed. The hole measured 6 ft. across and 20 ft. deep, and occurred in B.C. Hydro's W.A.C. Bennett Dam which measures 600 ft. high, 2,600 ft. wide at the base and 35 ft. wide at the crest. The cause of the sinkhole is not known, but it is believed that a weakness in the dam may have found its way to the surface via a pipe connected to a bedrock settlement gauge buried within the dam. Sonar and ground penetrating radar were used to examine the area. The hole has been filled with gravel and monitoring continues. Experts do not anticipate immediate risk of dam failure. 1 fig

  17. Environmental management in the Hydro-Electric Commission

    International Nuclear Information System (INIS)

    Scanlon, A.

    1995-01-01

    The Tasmanian Hydro Electric Commission (HEC) is a large and diverse organization, providing electricity generation, transmission, distribution and retail services throughout Tasmania. It is a significant manager of Tasmania's land and water resources and, as a consequence, has important environmental responsibilities. This paper outlines the background to conflict with the environmental movement over power generation development projects in south western Tasmania and the development of an environmental policy. As part of the environmental policy, the HEC has prepared environmental reviews, audits and risk assessment and is currently developing and implementing a comprehensive environmental management system. The HEC sees the introduction of the environmental management system as demonstrating a commitment to continuing environmental improvement and in establishing itself as a Tasmanian and national leader in the area of environmental management. 1 tab., 2 figs., 4 refs

  18. Service water electrochemical monitoring development at Ontario Hydro

    International Nuclear Information System (INIS)

    Brennenstuhl, A.M.

    1994-01-01

    Ontario Hydro (OH) is currently investigating the feasibility of using electrochemical techniques for the corrosion monitoring of service water systems. To date all evaluations have been carried out in a field simulator. The studies include examining the effects of; system startup after periods of stagnation, sodium hypochlorite injection, and zebra mussel settlement on metallic surfaces. Carbon steel and Type 304L stainless steel have been evaluated. Electrochemical potential noise (EPN), electrochemical current noise (ECN) potential and coupling current were semi-continuously monitored over a period of up to one year. Data obtained from the electrochemical noise monitoring has given OH valuable insights into the mechanisms of degradation in service water systems. The high sensitivity of the electrochemical noise technique, particularly to localized corrosion has proved to be the major attraction of the system

  19. Unmanned operation of Hydro Power Plants

    International Nuclear Information System (INIS)

    Regula, E.

    2008-01-01

    Intentions to launch unmanned operation are no news, the very first occurred in Hydro Power Plants (HPP) at the time when the first computer technology was implemented into process of power generation, i.e. no later than in 1960 s . ENEL entering Slovenske elektrarne not only revived but significantly accelerated the implementation process of unmanned operation. Experience of ENEL says that unmanned operation means better reliability of the HPP and this is the priority. (author)

  20. Development of coal hydro gasification technology

    International Nuclear Information System (INIS)

    Itoh, Kazuo; Nomura, Kazuo; Asaoka, Yoshikiyo; Kato, Shojiro; Seo, Tomoyuki

    1997-01-01

    Taking a potential future decrease in natural gas supply into consideration, we are looking for a way to secure a stable supply of high quality substitute natural gas made from coal (which occurs abundantly throughout the world) in large volumes at low cost. We are working towards our goal of commercializing coal hydro gasification technology in the 2010's and have started developing elemental technology from FY, 1996 as a part of the governmental new energy program. (au)

  1. Financing options for small hydro projects

    International Nuclear Information System (INIS)

    Shepherd, J.C.

    1993-01-01

    Examples and techniques used to enhance the ability to finance small hydro projects, or to finance them in non-standard ways, were discussed. It was suggested that factors that motivate investors, namely the maximization of the rate of return on capital, and minimization of risk, should be the primary concern for any would-be developer. A responsible, conservative approach to financial projections was recommended as the best to impress potential investors

  2. Climate change studies for Newfoundland and Labrador Hydro

    International Nuclear Information System (INIS)

    Snelgrove, K.; Roberts, J.; Organ, M.

    2008-01-01

    Change is a constant for hydroelectric utilities. These organizations are continually faced with challenges involving future change. Traditionally, forecasting load has been essential but more and more there is evidence that climate change planning will be required to forecast supply issues as well. Newfoundland and Labrador Hydro (NLH) are initiating a study of climate change and its implications for operations and planning of hydroelectric and wind energy projects. In collaboration with Memorial University's Faculty of Engineering, NLH will begin this investigation by quantifying changes to volumes and timing of water inflows to their hydroelectric reservoirs and its impact on future operations. As the work continues, these studies may extend to climate induced load forecasting, the implications of icing and other climate extremes on infrastructure, and the integration of climate dependent alternate energy sources such as wind into the NLH system. NLH's group of companies is the 4th largest utility in Canada in terms of installed capacity at 7,289 MW. In addition to thermal generation, NLH operates 10 hydroelectric generating stations including the Churchill Falls facility at 5,428 MW, which boasts the second largest underground powerhouse in the world. Plans are currently underway to add a further 2,824 MW of installed capacity through the Lower Churchill Project as well as a mix of other conventional and alternate energy sources envisioned by the Government of Newfoundland and Labrador's Energy Plan. Many of these assets, especially hydro and wind energy generation are tightly coupled to the vagaries of the climate systems. Given these dependencies it is prudent to quantify the magnitude and uncertainty associated with future climate impacts. This presentation will summarize some of the very preliminary activities that have taken place to date, summarize literature that is available regarding climate projections for Newfoundland and Labrador and discuss

  3. Optimal wind-hydro solution for the Marmara region of Turkey to meet electricity demand

    International Nuclear Information System (INIS)

    Dursun, Bahtiyar; Alboyaci, Bora; Gokcol, Cihan

    2011-01-01

    Wind power technology is now a reliable electricity production system. It presents an economically attractive solution for the continuously increasing energy demand of the Marmara region located in Turkey. However, the stochastic behavior of wind speed in the Marmara region can lead to significant disharmony between wind energy production and electricity demand. Therefore, to overcome wind's variable nature, a more reliable solution would be to integrate hydropower with wind energy. In this study, a methodology to estimate an optimal wind-hydro solution is developed and it is subsequently applied to six typical different site cases in the Marmara region in order to define the most beneficial configuration of the wind-hydro system. All numerical calculations are based on the long-term wind speed measurements, electrical load demand and operational characteristics of the system components. -- Research highlights: → This study is the first application of a wind-hydro pumped storage system in Turkey. → The methodology developed in this study is applied to the six sites in the Marmara region of Turkey. A wind - hydro pumped storage system is proposed to meet the electric energy demand of the Marmara region.

  4. Zebra mussels mitigation at Ontario Hydro's hydroelectric generating facilities

    International Nuclear Information System (INIS)

    Dorneanu, A.M.

    1992-01-01

    The Great Lakes and their connecting channels have recently been invaded by a tiny freshwater mollusc that has already cost Ontario Hydro millions of dollars. Dreissena polymorpha, commonly known as the zebra mussel, entered the great lakes in ballast water carried by a ship from Europe in 1985. These mussels threaten to reduce or totally block the flow of water in auxiliary systems of any generating station, water treatment plant or municipal water facility that uses raw lake water and to cause accelerated corrosion of the metallic substrate to which they attach themselves. To satisfy the immediate need for control, chlorination was identified as the most effective interim measure to prevent the biofouling of the raw water systems. Detection and monitoring of mussels and the installation, operation, environmental constraints, benefits and deficiencies of the chemical treatment system are presented. Long term objectives for control of the mussels are to develop alternatives to chlorination (ozone, hydrogen peroxide, protective coatings, thermal shock, mechanical filtration, etc.) for application at existing facilities and for incorporation into the design of new facilities and rehabilitation programs. 3 refs., 5 figs

  5. HydroSoft coil versus HydroCoil for endovascular aneurysm occlusion study: A single center experience

    International Nuclear Information System (INIS)

    Guo Xinbin; Fan Yimu; Zhang Jianning

    2011-01-01

    Background and purpose: The HydroCoil Embolic System (HES) was developed to reduce recurrences of aneurysms relative to platinum coils. But the HydroCoil Embolic System was characterized with many limitations. The manufacturer had recognized the challenge and recently a new design of hydrogel-coated coil-HydroSoft has become available in the market as the new generation HydroCoil. We reported our initial experience using HydroSoft coil versus HydroCoil in our center. Methods: 75 aneurysms embolized primarily using HydroSoft Coils from July 2008 to May 2009 were compared with 66 volume- and shape-matched aneurysms treated with HydroCoils from March 2006 to August 2008. Outcome measures included length and number of coils used, contrast volume, and length of hospital stay. During embolization, a stable framework was first established with bare coils, and hydrogel-coated coils were used subsequently to increase the packing density. Follow-up angiographic results 6 months after treatment were evaluated among some of the patients. Results: Successful coil embolization was achieved in all patients. There were no differences in average total coil length used per aneurysm. There were no differences in length of hospital stay and packing density. HydroSoft coils were more suitable using as the finishing or final coil. HydroSoft coil decreased the procedure-related retreated rates, and aneurysm packing was finished with soft, flexible HydroSoft coil and decreased the neck remnant rates. Follow-up angiography in HydroSoft-treated patients at 6 months revealed aneurysm stability without significant residual neck. Conclusions: HydroSoft coil allowed us to deploy coated coils with good packing density. A slight expansion of these coils at the neck can be expected to reduce neck remnant and potentially inhibit recurrence.

  6. An Overview of Power Topologies for Micro-hydro Turbines

    DEFF Research Database (Denmark)

    Nababan, Sabar; Muljadi, E.; Blaabjerg, Frede

    2012-01-01

    This paper is an overview of different power topologies of micro-hydro turbines. The size of micro-hydro turbine is typically under 100kW. Conventional topologies of micro-hydro power are stand-alone operation used in rural electrical network in developing countries. Recently, many of micro-hydro...... power generations are connected to the distribution network through power electronics (PE). This turbines are operated in variable frequency operation to improve efficiency of micro-hydro power generation, improve the power quality, and ride through capability of the generation. In this paper our...... discussion is limited to the distributed generation. Like many other renewable energy sources, the objectives of micro-hydro power generation are to reduce the use of fossil fuel, to improve the reliability of the distribution system (grid), and to reduce the transmission losses. The overview described...

  7. Vibration analysis of a hydro generator for different operating regimes

    Science.gov (United States)

    Haţiegan, C.; Pădureanu, I.; Jurcu, M.; Nedeloni, M. D.; Hamat, C. O.; Chioncel, C. P.; Trocaru, S.; Vasile, O.; Bădescu, O.; Micliuc, D.; (Filip Nedeloni, L.; Băra, A.; (Barboni Haţiegan, L.

    2017-01-01

    Based on experimental measurements, this paper presents the vibration analysis of a hydro generator that equips a Kaplan hydraulic turbine of a Hydropower plant in Romania. This analysis means vibrations measurement to different operating regimes of the hydro generator respectively before installing it and into operation, namely putting off load mode (unexcited and excited) respectively putting on load mode. By comparing, through the experimental results obtained before and after the operation of hydro aggregates are observed vibrations improvements.

  8. BOT schemes as financial model of hydro power projects

    International Nuclear Information System (INIS)

    Grausam, A.

    1997-01-01

    Build-operate-transfer (BOT) schemes are the latest methods adopted in the developing infrastructure projects. This paper outlines the project financing through BOT schemes and briefly focuses on the factors particularly relevant to hydro power projects. Hydro power development provides not only the best way to produce electricity, it can also solve problems in different fields, such as navigation problems in case of run-of-the river plants, ground water management systems and flood control etc. This makes HPP projects not cheaper, but hydro energy is a clean and renewable energy and the hydro potential worldwide will play a major role to meet the increased demand in future. 5 figs

  9. Exploring the impact of reduced hydro capacity and lignite resources on the Macedonian power sector development

    Directory of Open Access Journals (Sweden)

    Taseska-Gjorgievskaa Verica

    2014-01-01

    Full Text Available The reference development pathway of the Macedonian energy sector highlights the important role that lignite and hydro power play in the power sector, each accounting for 40% of total capacity in 2021. In 2030, this dominance continues, although hydro has a higher share due to the retirement of some of the existing lignite plants. Three sensitivity runs of the MARKAL-Macedonia energy system model have been undertaken to explore the importance of these technologies to the system, considering that their resource may be reduced with time: (1 Reducing the availability of lignite from domestic mines by 50% in 2030 (with limited capacity of imports, (2 Removing three large hydro options, which account for 310 MW in the business-as-usual case, and (3 Both of the above restrictions. The reduction in lignite availability is estimated to lead to additional overall system costs of 0.7%, compared to hydro restrictions at only 0.1%. With both restrictions applied, the additional costs rise to over 1%, amounting to 348 M€ over the 25 year planning horizon. In particular, costs are driven up by an increasing reliance on electricity imports. In all cases, the total electricity generation decreases, but import increases, which leads to a drop in capacity requirements. In both, the lignite and the hydro restricted cases, it is primarily gas-fired generation and imports that “fill the gap”. This highlights the importance of an increasingly diversified and efficient supply, which should be promoted through initiatives on renewables, energy efficiency, and lower carbon emissions.

  10. Hydro-Thermal-Wind Generation Scheduling Considering Economic and Environmental Factors Using Heuristic Algorithms

    Directory of Open Access Journals (Sweden)

    Suresh K. Damodaran

    2018-02-01

    Full Text Available Hydro-thermal-wind generation scheduling (HTWGS with economic and environmental factors is a multi-objective complex nonlinear power system optimization problem with many equality and inequality constraints. The objective of the problem is to generate an hour-by-hour optimum schedule of hydro-thermal-wind power plants to attain the least emission of pollutants from thermal plants and a reduced generation cost of thermal and wind plants for a 24-h period, satisfying the system constraints. The paper presents a detailed framework of the HTWGS problem and proposes a modified particle swarm optimization (MPSO algorithm for evolving a solution. The competency of selected heuristic algorithms, representing different heuristic groups, viz. the binary coded genetic algorithm (BCGA, particle swarm optimization (PSO, improved harmony search (IHS, and JAYA algorithm, for searching for an optimal solution to HTWGS considering economic and environmental factors was investigated in a trial system consisting of a multi-stream cascaded system with four reservoirs, three thermal plants, and two wind plants. Appropriate mathematical models were used for representing the water discharge, generation cost, and pollutant emission of respective power plants incorporated in the system. Statistical analysis was performed to check the consistency and reliability of the proposed algorithm. The simulation results indicated that the proposed MPSO algorithm provided a better solution to the problem of HTWGS, with a reduced generation cost and the least emission, when compared with the other heuristic algorithms considered.

  11. Market Power in Hydro-Thermal Supply

    International Nuclear Information System (INIS)

    Edin, Karl-Axel

    2006-12-01

    Despite having had a deregulated electricity market in Sweden for over ten years we still need to increase our understanding as to how deregulated electricity markets actually work and how possible problems are to be solved. One question that is always in focus is if the competition between generators in the Nordic electricity market really works the way it was intended. Many argue that the concentration in ownership of generation plants already has gone too far. Together with joint ownership in nuclear facilities and barriers for entrance, critics say that this has resulted in higher electricity prices than necessary. In this report different methods to (ex ante) study potential possibilities for generating firms to influence the electricity price (market power) and (ex post) discover possible manipulation through analysing the spot price and other observed factors on the electricity market are analysed. The purpose of the longer underlying paper is to give a comprehensive treatment of the electricity market with storage, i.e. hydro power, with an auction market organisation and to test the models on the Nordic market in order to explore the explanatory power of auction market theory and the theory of contestable market. The main theoretical effort in the paper concerns auction theory with inventories. The paper develops an inter-temporal auction model of a thermal-hydro power market. Parallel to the derivation of the basic equations a numerical model is developed in order to illustrate the results of the model. Section 2 of the present paper summarizes the basic equations (derived in the longer paper) for an inter-temporal auction thermal-hydro market. Section 3 contains the illustrations of solutions to equations for some stylized markets. In section 4 the auction model is tested on the Nordic market

  12. Standardized CSR and climate performance: why is Shell willing, but Hydro reluctant?; Shell; Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Boasson, Elin Lerum; Wettestad, Joergen

    2007-06-15

    This report aims to contribute to the ongoing discussion concerning whether CSR merely serves to streamline company rhetoric or also has an influence on actual efforts. We discuss the tangible effects of CSR instruments on the climate-related rules and performances of the two different oil companies Hydro and Shell. First we explore whether similar CSR instruments lead to similar climate-related rules and practices in the two companies. Both Hydro and Shell adhere to the Global Compact (GC), the Global Reporting Initiative (GRI), the Carbon Disclosure Project (CDP) and the Global Gas Flaring Reduction Public-Private Partnership (GGFR). The report concludes that the GC has not rendered any tangible effects in either of the companies. Concerning the other instruments, Hydro has only followed the instrument requirements that fit their initial approach, and refrained from all deviating requirements. Shell has been more malleable, but we have noted few effects on the actual emissions and business portfolio resulting from the instrument adherence. Second, we assess how the differing results of the similar CSR portfolio may be explained. The reluctant attitude of the leaders in Hydro and the strong CSR motivation of Shell's executives result in significant differences. Hydro executives are able to constrain the effects of the instrument adherence. With Shell we note the opposite pattern: Its leaders promoted the instruments to be translated into internal rules, but a general lack of hierarchical structures hinders them from governing the conduct of various sub-organisations. The very diversity of the Shell culture helps to explain why the efforts of its executives have resulted in limited impact. The strength of the Hydro culture makes the corporation resistant to the instruments. Moreover, Hydro is strikingly shielded by virtue of its strong position in Norway. In contrast, Shell is more strongly affected by the global field of petroleum and the global field of CSR

  13. Implementing network constraints in the EMPS model

    Energy Technology Data Exchange (ETDEWEB)

    Helseth, Arild; Warland, Geir; Mo, Birger; Fosso, Olav B.

    2010-02-15

    This report concerns the coupling of detailed market and network models for long-term hydro-thermal scheduling. Currently, the EPF model (Samlast) is the only tool available for this task for actors in the Nordic market. A new prototype for solving the coupled market and network problem has been developed. The prototype is based on the EMPS model (Samkjoeringsmodellen). Results from the market model are distributed to a detailed network model, where a DC load flow detects if there are overloads on monitored lines or intersections. In case of overloads, network constraints are generated and added to the market problem. Theoretical and implementation details for the new prototype are elaborated in this report. The performance of the prototype is tested against the EPF model on a 20-area Nordic dataset. (Author)

  14. Hydro-electric power - potential and limitations

    International Nuclear Information System (INIS)

    Amundsen, T.

    1995-01-01

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world's growing population, the unavoidable conclusion is that more power is to be produced. 3 figs

  15. Global warming: a changing climate for hydro

    International Nuclear Information System (INIS)

    Oud, E.

    1993-01-01

    This paper quantifies the benefits attributable to hydroelectric power generation in preventing carbon dioxide emissions from the use of thermal plants. It proposes that utilities and funding agencies consider the societal costs associated with the emission of CO 2 in power system planning. It also suggests that the industrialized countries should consider changing their funding practice and give more appropriate credits for the construction of hydro plants in developing countries, with a view to avoiding the construction and operation of fossil fuelled powerplants. (author)

  16. Main coolant pump testing at Ontario Hydro

    International Nuclear Information System (INIS)

    Hartlen, R.

    1991-01-01

    This article describes Ontario Hydro Research Division's experience with a computerized data acquisition and analysis system for monitoring mechanical vibration in reactor coolant pumps. The topics covered include bench-marking of the computer system and the coolant pumps, signatures of normal and malfunctioning pumps, analysis of data collected by the monitoring system, simulation of faults, and concerns that have been expressed about data interpretation, sensor types and locations, alarm/shutdown limits and confirmation of nondestructive examination testing. This presentation consists of overheads only

  17. Hydro-electric power - potential and limitations

    Energy Technology Data Exchange (ETDEWEB)

    Amundsen, T.

    1995-12-31

    This paper focuses on efficiency improvement in electric power production by matching the different characteristics for thermal power and hydropower. The paper introduces secondary hydropower defined as available power stored as hydro-energy in water reservoirs as a key element to achieve this goal. The iron-locked connection between GDP (Gross Domestic Product) and power consumption is discussed. As it also is a general understanding that GDP has to increase to accommodate the world`s growing population, the unavoidable conclusion is that more power is to be produced. 3 figs.

  18. The Ontario Hydro mortality surveillance programme

    International Nuclear Information System (INIS)

    Anderson, T.W.

    1985-01-01

    The Ontario Hydro mortality surveillance programme was the first such study established in any group of radiation workers. Copies of annual reports are available to senior officials of both management and union and to members of the general public. Apart from an elevated Standardized Mortality Ratio in the 15.0 - 19.9 cSv range, there is no suggestion of any rising cancer death rate with increased lifetime radiation dose. It should be noted that employees who had left before pensionable age were not included in the study. Results of the study are presented in tabular form

  19. The hydro-mechanical modeling of the fractured media; Modelisation hydromecanique des milieux fractures

    Energy Technology Data Exchange (ETDEWEB)

    Kadiri, I

    2002-10-15

    The hydro-mechanical modeling of the fractured media is quite complex. Simplifications are necessary for the modeling of such media, but, not always justified, Only permeable fractures are often considered. The rest of the network is approximated by an equivalent continuous medium. Even if we suppose that this approach is validated, the hydraulic and mechanical properties of the fractures and of the continuous medium are seldom known. Calibrations are necessary for the determination of these properties. Until now, one does not know very well the nature of measurements which must be carried out in order to carry on a modeling in discontinuous medium, nor elements of enough robust validation for this kind of modeling. For a better understanding of the hydro-mechanical phenomena in fractured media, two different sites have been selected for the work. The first is the site of Grimsel in Switzerland in which an underground laboratory is located at approximately 400 m of depth. The FEBEX experiment aims at the in-situ study of the consecutive phenomena due to the installation of a heat source representative of radioactive waste in the last 17 meters of the FEBEX tunnel in the laboratory of Grimsel. Only, the modeling of the hydro-mechanical of the excavation was model. The modeling of the Febex enabled us to establish a methodology of calibration of the hydraulic properties in the discontinuous media. However, this kind of study on such complex sites does not make possible to answer all the questions which arise on the hydro-mechanical behavior of the fractured media. We thus carried out modeling on an other site, smaller than the fist one and more accessible. The experimental site of Coaraze, in the Maritime Alps, is mainly constituted of limestone and fractures. Then the variation of water pressure along fractures is governed by the opening/closure sequence of a water gate. Normal displacement as well as the pore pressure along these fractures are recorded, and then

  20. Low head hydro market assessment : main report : vol. 1

    International Nuclear Information System (INIS)

    2008-03-01

    Hydroelectric power is a predictable renewable energy source that produces no greenhouse gases (GHGs) and has low maintenance costs. In addition to river resources, low head hydro is available in sluice gates, irrigation canals, drinking water pressure release valves, and municipal wastewater outfalls. Canada's potential for low head hydro has been estimated at 5000 MW at 2000 different sites across the country. Sites of up to 50 MW have been identified in Ontario and Manitoba. This study performed a market assessment on low head hydro developments. Available and emerging technologies for developing low head hydro were identified. The economics of low head hydro in Canada were explored, and barriers to low head hydro development were identified. Strategies to promote low head hydro development were also explored, and the impact of different incentive types on the low head hydropower market were estimated using a simple economic model. It was concluded that a reduced, streamlined, and standardized environmental assessment process will significantly benefit low head hydro development in Canada. 5 refs., 14 tabs., 17 figs

  1. Interconnected hydro-thermal systems - Models, methods, and applications

    DEFF Research Database (Denmark)

    Hindsberger, Magnus

    2003-01-01

    to be performed where the uncertainty of the inflow to the hydro reservoirs is handled endogenously. In this model snow reservoirs have been added in addition to the hydro reservoirs. Using this new approach allows sampling based decomposition algorithms to be used, which have proved to be efficient in solving...

  2. 75 FR 45607 - Application To Export Electric Energy; Manitoba Hydro

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF ENERGY [OE Docket No. EA-281-B] Application To Export Electric Energy; Manitoba Hydro AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of application. SUMMARY: Manitoba Hydro (Manitoba) has applied to renew its authority to transmit electric energy from the...

  3. The Atlin Hydro Project : generation for generations

    Energy Technology Data Exchange (ETDEWEB)

    Simpson, S. [Atlin Tlingit Development Corp., Atlin, BC (Canada)

    2010-07-01

    This presentation documented the step-by-step process by which the Atlin Hydro Project was developed. The Taku River Tlingit First Nation undertook the Atlin project as part of its vision for responsible resource management, sustainable economic development, and cultural revival. The Atlin Community Energy Plan involved an assessment of electricity demand, a 20-year demand projection, energy efficiency recommendations, and an assessment of power supply options such as wind towers, connection to the Yukon power grid, and hydro. The potential impact on fisheries, hydrology, wildlife habitat, roads and bridges, navigable waters and forests, existing rights, and First Nation archaeology were assessed, along with other factors such as hazards and flood control. A hydrology assessment of the Surprise-Pine Drainage Basin was undertaken, and stream-flow measurements were taken near the intake location on Pine Creek. The project comprises a discharge control structure and a fish ladder; an intake and weir on Pine Creek; a penstock pipeline from intake to powerhouse; a powerhouse with a 2.1 MW Pelton turbine generator and a switch yard; and a power line from the powerhouse to the interconnection with the existing grid. The impacts on fisheries, wildlife, and human movement are expected to be minimal. 28 figs., 3 tabs.

  4. Ontario hydro waste storage concepts and facilities

    International Nuclear Information System (INIS)

    Carter, T.J.; Mentes, G.A.

    1976-01-01

    Ontario Hydro presently operates 2,200 MWe of CANDU heavy water reactors with a further 11,000 MWe under design or construction. The annual quantities of low and medium level solid wastes expected to be produced at these stations are tabulated. In order to manage these wastes, Ontario Hydro established a Radioactive Waste Operations Site within the Bruce Nuclear Power Development located on Lake Huron about 250 km northwest of Toronto. The Waste Operations Site includes a 19-acre Storage Site plus a Radioactive Waste Volume Reduction Facility consisting of an incinerator and waste compactor. Ontario has in use or under construction both in-ground and above-ground storage facilities. In-ground facilities have been used for a number of years while the above-ground facilities are a more recent approach. Water, either in the form of precipitation, surface or subsurface water, presents the greatest concern with respect to confinement integrity and safe waste handling and storage operations

  5. Hydro Power Reservoir Aggregation via Genetic Algorithms

    Directory of Open Access Journals (Sweden)

    Markus Löschenbrand

    2017-12-01

    Full Text Available Electrical power systems with a high share of hydro power in their generation portfolio tend to display distinct behavior. Low generation cost and the possibility of peak shaving create a high amount of flexibility. However, stochastic influences such as precipitation and external market effects create uncertainty and thus establish a wide range of potential outcomes. Therefore, optimal generation scheduling is a key factor to successful operation of hydro power dominated systems. This paper aims to bridge the gap between scheduling on large-scale (e.g., national and small scale (e.g., a single river basin levels, by applying a multi-objective master/sub-problem framework supported by genetic algorithms. A real-life case study from southern Norway is used to assess the validity of the method and give a proof of concept. The introduced method can be applied to efficiently integrate complex stochastic sub-models into Virtual Power Plants and thus reduce the computational complexity of large-scale models whilst minimizing the loss of information.

  6. Hydro-Quebec and energy efficiency

    International Nuclear Information System (INIS)

    1990-01-01

    There is growing awareness that energy efficiency is both profitable and environmentally beneficial. In this year's Development Plan, Hydro-Quebec is proposing an Energy Efficiency Project made up of marketing programs designed for all markets throughout the final decade of the 20th century. This Project will have two aspects: energy efficiency and consumption management. Hydro-Quebec aims to reach an energy-efficiency level of 12.9 terawatt hours per year by 1999, fully 55% of its 23-terawatt hour potential. Over the next 10 years the utility intends to spend $1.8 billion for this purpose. Cumulative anticipated energy savings should be in the vicinity of 70 terawatt hours for the coming decade, and more than 130 terawatt hours for the first decade of the next century. Of the overall goal of 12.9 terawatt hours for Horizon 1999, energy savings of 9.0 terawatt hours should be the direct result of this year's proposed marketing programs, and will account for the bulk of anticipated investments. The remaining 3.9 terawatt hours will be gained as customers acquire better electrical appliance and accessory (household appliances, home insulation) buying habits

  7. Wound bed preparation: A novel approach using HydroTherapy.

    Science.gov (United States)

    Atkin, Leanne; Ousey, Karen

    2016-12-01

    Wounds that fail to heal quickly are often encountered by community nursing staff. An important step in assisting these chronic or stalled wounds progress through healing is debridement to remove devitalised tissue, including slough and eschar, that can prevent the wound from healing. A unique wound treatment called HydroTherapy aims to provide an optimal healing environment. The first step of HydroTherapy involves HydroClean plus™, this dressing enables removal of devitalised tissue through autolytic debridement and absorption of wound fluid. Irrigation and cleansing provided by Ringer's solution from the dressing further removes any necrotic tissue or eschar. Once effective wound bed preparation has been achieved a second dressing, HydroTac™, provides an ongoing hydrated wound environment that enables re-epithelialisation to occur in an unrestricted fashion. This paper presents 3 case studies of slow healing wounds treated with HydroClean plus™ which demonstrates effective wound debridement.

  8. Financing Constraints and Entrepreneurship

    OpenAIRE

    William R. Kerr; Ramana Nanda

    2009-01-01

    Financing constraints are one of the biggest concerns impacting potential entrepreneurs around the world. Given the important role that entrepreneurship is believed to play in the process of economic growth, alleviating financing constraints for would-be entrepreneurs is also an important goal for policymakers worldwide. We review two major streams of research examining the relevance of financing constraints for entrepreneurship. We then introduce a framework that provides a unified perspecti...

  9. Temporal Concurrent Constraint Programming

    DEFF Research Database (Denmark)

    Nielsen, Mogens; Valencia Posso, Frank Dan

    2002-01-01

    The ntcc calculus is a model of non-deterministic temporal concurrent constraint programming. In this paper we study behavioral notions for this calculus. In the underlying computational model, concurrent constraint processes are executed in discrete time intervals. The behavioral notions studied...... reflect the reactive interactions between concurrent constraint processes and their environment, as well as internal interactions between individual processes. Relationships between the suggested notions are studied, and they are all proved to be decidable for a substantial fragment of the calculus...

  10. Hydro-economic modelling in mining catchments

    Science.gov (United States)

    Ossa Moreno, J. S.; McIntyre, N.; Rivera, D.; Smart, J. C. R.

    2017-12-01

    Hydro-economic models are gaining momentum because of their capacity to model both the physical processes related to water supply, and socio-economic factors determining water demand. This is particularly valuable in the midst of the large uncertainty upon future climate conditions and social trends. Agriculture, urban uses and environmental flows have received a lot of attention from researchers, as these tend to be the main consumers of water in most catchments. Mine water demand, although very important in several small and medium-sized catchments worldwide, has received less attention and only few models have attempted to reproduce its dynamics with other users. This paper describes an on-going project that addresses this gap, by developing a hydro-economic model in the upper Aconcagua River in Chile. This is a mountain catchment with large scale mining and hydro-power users at high altitudes, and irrigation areas in a downstream valley. Relevant obstacles to the model included the lack of input climate data, which is a common feature in several mining areas, the complex hydrological processes in the area and the difficulty of quantifying the value of water used by mines. A semi-distributed model developed within the Water Evaluation and Planning System (WEAP), was calibrated to reproduce water supply, and this was complemented with an analysis of the value of water for mining based on two methods; water markets and an analysis of its production processes. Agriculture and other users were included through methods commonly used in similar models. The outputs help understanding the value of water in the catchment, and its sensitivity to changes in climate variables, market prices, environmental regulations and changes in the production of minerals, crops and energy. The results of the project highlight the importance of merging hydrology and socio-economic calculations in mining regions, in order to better understand trade-offs and cost of opportunity of using

  11. Constraint satisfaction problems CSP formalisms and techniques

    CERN Document Server

    Ghedira, Khaled

    2013-01-01

    A Constraint Satisfaction Problem (CSP) consists of a set of variables, a domain of values for each variable and a set of constraints. The objective is to assign a value for each variable such that all constraints are satisfied. CSPs continue to receive increased attention because of both their high complexity and their omnipresence in academic, industrial and even real-life problems. This is why they are the subject of intense research in both artificial intelligence and operations research. This book introduces the classic CSP and details several extensions/improvements of both formalisms a

  12. Credit Constraints, Political Instability, and Capital Accumulation

    OpenAIRE

    Risto Herrala; Rima Turk-Ariss

    2013-01-01

    We investigate the complex interactions between credit constraints, political instability, and capital accumulation using a novel approach based on Kiyotaki and Moore’s (1997) theoretical framework. Drawing on a unique firm-level data set from Middle-East and North Africa (MENA), empirical findings point to a large and significant effect of credit conditions on capital accumulation and suggest that continued political unrest worsens credit constraints. The results support the view that financ...

  13. Architecture at Hydro-Quebec. L'architecture a Hydro-Quebec

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    Architecture at Hydro-Quebec is concerned not only with combining function and aesthetics in designing buildings and other structures for an electrical utility, but also to satisfy technical and administrative needs and to help solve contemporary problems such as the rational use of energy. Examples are presented of Hydro-Quebec's architectural accomplishments in the design of hydroelectric power stations and their surrounding landscapes, thermal power stations, transmission substations, research and testing facilities, and administrative buildings. It is shown how some buildings are designed to adapt to local environments and to conserve energy. The utility's policy of conserving installations of historic value, such as certain pre-1930 power stations, is illustrated, and aspects of its general architectural policy are outlined. 20 figs.

  14. Thermo-hydro-mechanical behavior of argillite

    International Nuclear Information System (INIS)

    Tran, Duy Thuong; Dormieux, Luc; Lemarchand, Eric; Skoczylas, Frederic

    2012-01-01

    Document available in extended abstract form only. Argillite is a very low permeability geo-material widely encountered: that is the reason why it is an excellent candidate for the storage of long-term nuclear waste depositories. This study focuses on argillites from Meuse-Haute-Marne (East of France) which forms a geological layer located approximately 400 m and 500 m depth. We know that this material is made up of a mixture of shale, quartz and calcite phases. The multi-scale definition of this material suggests the derivation of micro-mechanics reasonings in order to better account for the mechanisms occurring at the local (nano and micro-) scale and controlling the macroscopic mechanical behavior. In this work, up-scaling techniques are used in the context of thermo-hydro-mechanical couplings. The first step consists in clarifying the morphology of the microstructure at the relevant scales (particles arrangement, pore size distribution) and identifying the mechanisms that take place at those scales. These local informations provide the input data of micro-mechanics based models. Schematic picture of the microstructure where the argillite material behaves as a dual-porosity, with liquid in both micro-pores and interlayer space in between clay solid platelets, seems a reasonable starting point for this micro-mechanical modelling of clay. This allows us to link the physical phenomena (swelling clays) and the mechanical properties (elastic moduli, Poisson's ratio). At the pressure applied by the fluid on the solid platelets appears as the sum of the uniform pressure in the micro-pores and of a swelling overpressure depending on the distance between platelets and on the ion concentration in the micro-pores. The latter is proved to be responsible for a local elastic modulus of physical origin. This additional elastic component may strongly be influenced by both relative humidity and temperature. A first contribution of this study is to analysing this local elastic

  15. Development and applications of reactor noise analysis at Ontario Hydro`s CANDU reactors

    Energy Technology Data Exchange (ETDEWEB)

    Gloeckler, O [Ontario Hydro, Toronto, ON (Canada); Tulett, M V [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1996-12-31

    In 1992 a program was initiated to establish reactor noise analysis as a practical tool for plant performance monitoring and system diagnostics in Ontario Hydro`s CANDU reactors. Since then, various CANDU-specific noise analysis applications have been developed and validated. The noise-based statistical techniques are being successfully applied as powerful troubleshooting and diagnostic tools to a wide variety of actual operational I and C problems. The dynamic characteristics of critical plant components, instrumentation and processes are monitored on a regular basis. Recent applications of noise analysis include (1) validating the dynamics of in-core flux detectors (ICFDS) and ion chambers, (2) estimating the prompt fraction ICFDs in noise measurements at full power and in power rundown tests, (3) identifying the cause of excessive signal fluctuations in certain flux detectors, (4) validating the dynamic coupling between liquid zone control signals, (5) detecting and monitoring mechanical vibrations of detector tubes induced by moderator flow, (6) estimating the dynamics and response time of RTD (Resistance Temperature Detector) temperature signals, (7) isolating the cause of RTD signal anomalies, (8) investigating the source of abnormal flow signal behaviour, (9) estimating the overall response time of flow and pressure signals, (10) detecting coolant boiling in fully instrumented fuel channels, (11) monitoring moderator circulation via temperature noise, and (12) predicting the performance of shut-off rods. Some of these applications are performed on an as-needed basis. The noise analysis program, in the Pickering-B station alone, has saved Ontario Hydro millions of dollars during its first three years. The results of the noise analysis program have been also reviewed by the regulator (Atomic Energy Control Board of Canada) with favorable results. The AECB have expressed interest in Ontario Hydro further exploiting the use of noise analysis technology. (author

  16. The dual hydro x nuclear power plants

    International Nuclear Information System (INIS)

    Borges, J.C.

    1984-01-01

    An our daily life in modern society becomes more and more dependent on electricity, supply of this kind of energy should not only be a part of a global energy policy, but also lay down rigorous criteria to garanty the market supply. Planning actions of the electrical sector are more sensitive to unforseen events, either to brief interruptions in energy supply or to non-equilibrium at any time of the excess of supply over demand. In this way, the cost factor although basic, does not lead to optimal solutions in decisions which involve options between different technologies and energy sources to generate electricity. In this paper, we analyse the above situation in the case of deciding between utilization of nuclear or hydro power plants to supply the Brazilian demande for electricity. Our final objective was the search for parameters which could lead us to better identify and understand the adroitness and mistakes of the Brazilian Nuclear Program. (Author) [pt

  17. Ontario Hydro nuclear - challenges of the future

    International Nuclear Information System (INIS)

    Field, R.

    1996-01-01

    The challenges facing Ontario Hydro Nuclear (OHN), as understood at the time of the conference, are discussed. OHN had many strengths to build on in preparing for the competition ahead, including: extremely competitive production costs, strong technical capabilities, advantages of multiple units, environmental advantages favoring nuclear, strong public support, and improving station performance. Even with these advantages, OHN faced the difficult challenge of improving overall performance in the face of a large debt burden, coupled with the reinvestment demands of aging units at Pickering A and Bruce A. At the time of the conference, Bruce 2 had already been shut down, because the cost of retubing it and replacing its boilers could not be justified. The ''drive to nuclear excellence'' involves the simultaneous achievement of top performance in safety, reliability and cost; and to this end, changes were being made to reverse the trends indicated by disappointing ''peer reviews''

  18. Ontario Hydro's integrated air management plan

    International Nuclear Information System (INIS)

    Kalvins, A.K.; Brown, D.; Camacho, F.; Howes, H.; Jantzi, B.; Lin, X.; Lui, P.; Melo, O.T.; Mortimer, W.P.; Reuber, B.

    1992-01-01

    Ontario Hydro is developing an integrated air management plan as a tool for comparing the environmental impacts of fossil-fuel power generation options. The goal is to relate equipment, location, emissions, and impacts and to identify the optimum way to manage the utility's fossil generation system in view of upcoming environmental regulations and public expectations. The eight steps of the plan are briefly described: definition of power generation scenarios (upgrading, conversion to natural gas, non-utility generation, alternative technologies); estimation of emissions for each generation and fuel option studied; identification of impact of air emissions on building materials, agriculture, forests, lakes, and fisheries; modelling of air emissions dispersion; quantification of damage to pollution receptors; quantification of full fuel cycle effects; and comparison of the scenarios. The scenario having the lowest overall environmental impact involved upgrading the existing fossil-fuel system with additional air emissions controls and two integrated gasification combined cycle plants. 9 refs., 3 figs., 3 tabs

  19. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  20. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  1. Experience of pico/micro hydro based power generation

    Energy Technology Data Exchange (ETDEWEB)

    Murthy, S.S. [Indian Inst. of Technology, Delhi, New Delhi (India). Dept. of Electrical Engineering

    2010-07-01

    Although India has approximately 150,000 megawatts of hydro potential, only a small portion is tapped. There is also significant untapped hydro potential in many developing countries such as Nepal, Bhutan, Vietnam, Indonesia and regions in South America and Africa. Small-scale hydroelectric power systems with capacities of up to a few megawatts are eco-friendly and sustainable. They can be classified based on unit sizes as pico (u pto 10 kilowatts), micro (10-100 kilowatts) and mini (100 kilowatts to a few megawatts) hydro systems. Mini hydro systems are always grid connected while micro can be either grid connected or off grid. Pico is always off grid. In India, there are thousands of favorable sites in this range that should be tapped for distributed power generation to electrify local communities. This need is reflected by the global emphasis on distributed power generation as well as the Government of India's policy to promote this type of power generation. A working stand alone pico-hydro power generating system has been successfully installed in 5 sites in Karnataka. The purpose of the project was to demonstrate the technical, managerial and economic feasibility of setting up small hydro projects in remote hilly areas of Karnataka, India and its positive environmental impact. The presentation discussed the site selection criteria; installed sites of pico hydro; system description; parts of the system; the electric load controller; types of electronic load controllers; and a description of the unit and control scheme. tabs., figs.

  2. Innovative private micro-hydro power development in Rwanda

    International Nuclear Information System (INIS)

    Pigaht, Maurice; Plas, Robert J. van der

    2009-01-01

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (i) institutional arrangements rather than technical quality determine the success of such projects; (ii) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (iii) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too.

  3. Innovative private micro-hydro power development in Rwanda

    Energy Technology Data Exchange (ETDEWEB)

    Pigaht, Maurice; Van der Plas, Robert J. [MARGE-Netherlands, Brem 68, 7577 EW Oldenzaal (Netherlands)

    2009-11-15

    Under the 'Private Sector Participation in Micro-Hydro Development Project in Rwanda', four newly registered Rwandan companies are each constructing a micro-hydro electricity plant (100-500 kW) and building a low-voltage distribution grid. These companies financed their plants through their own equity and debt with support from the PSP Hydro project. This support comprised a subsidy of 30-50% of investment costs, technical and business development assistance, project monitoring and financial controlling. The experiences gained so far have important implications for similar future micro-hydro energy sector development projects and this paper puts forward three key messages: (1) institutional arrangements rather than technical quality determine the success of such projects; (2) truly sustainable rural electrification through micro-hydro development demands a high level of local participation at all levels and throughout all project phases, not just after plant commissioning; and (3) real impact and sustainability can be obtained through close collaboration of local private and financial sector firms requiring only limited external funds. In short, micro-hydro projects can and will be taken up by local investors as a business if the conditions are right. Applying these messages could result in an accelerated uptake of viable micro-hydro activities in Rwanda, and in the opinion of the authors elsewhere too. (author)

  4. Multifractal Conceptualisation of Hydro-Meteorological Extremes

    Science.gov (United States)

    Tchiguirinskaia, I.; Schertzer, D.; Lovejoy, S.

    2009-04-01

    Hydrology and more generally sciences involved in water resources management, technological or operational developments face a fundamental difficulty: the extreme variability of hydro-meteorological fields. It clearly appears today that this variability is a function of the observation scale and yield hydro-meteorological hazards. Throughout the world, the development of multifractal theory offers new techniques for handling such non-classical variability over wide ranges of time and space scales. The resulting stochastic simulations with a very limited number of parameters well reproduce the long range dependencies and the clustering of rainfall extremes often yielding fat tailed (i.e., an algebraic type) probability distributions. The goal of this work was to investigate the ability of using very short or incomplete data records for reliable statistical predictions of the extremes. In particular we discuss how to evaluate the uncertainty in the empirical or semi-analytical multifractal outcomes. We consider three main aspects of the evaluation, such as the scaling adequacy, the multifractal parameter estimation error and the quantile estimation error. We first use the multiplicative cascade model to generate long series of multifractal data. The simulated samples had to cover the range of the universal multifractal parameters widely available in the scientific literature for the rainfall and river discharges. Using these long multifractal series and their sub-samples, we defined a metric for parameter estimation error. Then using the sets of estimated parameters, we obtained the quantile values for a range of excedance probabilities from 5% to 0.01%. Plotting the error bars on a quantile plot enable an approximation of confidence intervals that would be particularly important for the predictions of multifractal extremes. We finally illustrate the efficiency of such concept on its application to a large database (more than 16000 selected stations over USA and

  5. Hydro-Quebec annual report, 1993

    International Nuclear Information System (INIS)

    1994-01-01

    An overview is presented of the activities of Hydro-Quebec for the year ended December 31, 1993, as well as its financial status. Export sales of electricity to other Canadian provinces and the USA are reported. Research programs and demonstration projects are described, as well as the utility's international activities. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1993, total sales volume was 152.1 TWh, or 7.5 TWh more than in 1992, for a total sales revenue of $7,004 million, an increase of 3.5% over 1992. Sales in Quebec increased 5 TWh, with nearly all of this increase coming from the industrial sector. Exports outside of Quebec totalled 15 TWh, or 20% more than in 1992. The largest increase in exports was in the form of short-term sales to the USA. Expenditures in 1993 were $3,761 million, only slightly more than in 1992. Facilities commissioned in 1993 included the Brisay power plant, two of six units at the Laforge-1 plant, and the north portion of the 12th transmission line from the LaGrande complex. Total installed capacity of the Hydro-Quebec system reached 29,131 MW, and total power produced was 131.6 TWh. Total length of transmission and distribution lines in 1993 reached 29,869 km and 100,908 km respectively. 9 figs., 17 tabs

  6. Temporal Concurrent Constraint Programming

    DEFF Research Database (Denmark)

    Nielsen, Mogens; Palamidessi, Catuscia; Valencia, Frank Dan

    2002-01-01

    The ntcc calculus is a model of non-deterministic temporal concurrent constraint programming. In this paper we study behavioral notions for this calculus. In the underlying computational model, concurrent constraint processes are executed in discrete time intervals. The behavioral notions studied...

  7. Evaluating Distributed Timing Constraints

    DEFF Research Database (Denmark)

    Kristensen, C.H.; Drejer, N.

    1994-01-01

    In this paper we describe a solution to the problem of implementing time-optimal evaluation of timing constraints in distributed real-time systems.......In this paper we describe a solution to the problem of implementing time-optimal evaluation of timing constraints in distributed real-time systems....

  8. Theory of Constraints (TOC)

    DEFF Research Database (Denmark)

    Michelsen, Aage U.

    2004-01-01

    Tankegangen bag Theory of Constraints samt planlægningsprincippet Drum-Buffer-Rope. Endvidere skitse af The Thinking Process.......Tankegangen bag Theory of Constraints samt planlægningsprincippet Drum-Buffer-Rope. Endvidere skitse af The Thinking Process....

  9. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs.

  10. Hydro Ottawa Holding Inc. 2004 annual report : 3 ways to make 1 powerful connection

    International Nuclear Information System (INIS)

    2005-01-01

    An overview of the municipally owned Hydro Ottawa Holding Inc. was presented in this annual report. In 2004, the utility moved out of a deficit position for the first time in its 4 year history. Consolidated net earnings from continuing and discontinued operations increased to $19.7 million from $2.6 million. The increase was due mainly to decreases in operating, maintenance and administrative costs, as well as to the recovery of the cost of regulatory assets and the gain on the disposal of discontinued operations. As a result, the Corporation's deficit of $16.9 million became retained earnings of $2.8 million. Financial highlights were presented, as well as a comparison of distributors' charges with other utilities. It was noted that transparency and accountability were improved with more regular reporting to its shareholder, the City of Ottawa. In late 2004, City Council approved Hydro Ottawa Holding's 5 year consolidated financial plan which recommended that the City invest $37.8 million back into the Corporation and receive payment of the balance. The payback of the City's loan was financed through the Corporation's placement, in 2005, of $200 million in bonds. New programs included a trash-to-electricity contract, a bounty on energy-wasting fridges, and Telecom Ottawa's Data Backup and Recovery Service. Hydro Ottawa Holding Inc. is an amalgamation of 5 Ottawa-area utilities, and now provides leadership to 3 subsidiaries: Hydro Ottawa Ltd., Energy Ottawa Inc., and Telecom Ottawa Holding Inc.. Financial highlights of the 3 subsidiaries were also provided. tabs., figs

  11. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  12. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2008

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Eva; Nyberg, Goeran (GEOSIGMA, Uppsala (Sweden))

    2009-08-15

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2008. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed.

  13. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2009

    Energy Technology Data Exchange (ETDEWEB)

    Wass, Eva; Nyberg, Goeran (GEOSIGMA, Uppsala (Sweden))

    2010-05-15

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2009. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  14. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2008

    International Nuclear Information System (INIS)

    Wass, Eva; Nyberg, Goeran

    2009-08-01

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2008. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  15. Aespoe Hard Rock Laboratory. Hydro Monitoring Program. Report for 2009

    International Nuclear Information System (INIS)

    Wass, Eva; Nyberg, Goeran

    2010-05-01

    The Aespoe island is situated close to the nuclear power plant of Simpevarp in southeastern Sweden. As part of the pre-investigations preceding excavation of the Aespoe Hard Rock Laboratory, registrations of the groundwater levels and electrical conductivity in packed-off borehole sections and levels in open boreholes started in 1987. The investigations are still ongoing and are planned to continue for a long period of time. As the tunnel excavation went on from the autumn 1990 and onwards, new boreholes were drilled in the tunnel and instrumented to enable groundwater pressure monitoring in packed-off sections. In addition, other hydro-related measurements such as water flow in the tunnel, electrical conductivity of tunnel water and inflow and outflow of water through tunnel pipes have been performed. This report is a summary of the monitoring during 2009. In order to allow for comparison with factors that may influence the groundwater level/pressure and flow, meteorological data are also presented in the report. From the end of 1991, the disturbance from the tunnel is the dominating factor influencing groundwater levels in the area. In one chapter, activities that may have an influence on the ground water situation are listed and briefly discussed

  16. Short-term regulation of hydro powerplants. Studies on the environmental effects

    International Nuclear Information System (INIS)

    Sinisalmi, T.; Riihimaeki, J.; Vehanen, T.; Yrjaenae, T.

    1997-01-01

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs

  17. Short-term regulation of hydro powerplants. Studies on the environmental effects

    Energy Technology Data Exchange (ETDEWEB)

    Sinisalmi, T. [ed.; Forsius, J.; Muotka, J.; Soimakallio, H. [Imatran Voima Oy, Vantaa (Finland); Riihimaeki, J. [VTT, Espoo (Finland); Vehanen, T. [Finnish Game and Fisheries Research Inst. (Finland); Yrjaenae, T. [North Ostrobothnia Regional Environmental Centre, Oulu (Finland)

    1997-12-31

    The publication is a final report on a project studying effects of short-term regulation of hydro power plants. The project consists of two parts: (1) examining and developing methods for evaluation, (2) applying methods in a case study at the Oulujoki River. The economic value of short-term regulation was studied with a model consisting of an optimization model and a river simulation model. Constraints on water level or discharge variations could be given to the power plants and their economical influence could be studied. Effects on shoreline recreation use due to water level fluctuation were studied with a model where various effects are made commensurable and expressed in monetary terms. A literature survey and field experiments were used to study the methods for assessing effects of short-term regulation on river habitats. The state and development needs of fish stocks and fisheries in large regulated rivers were studied and an environmental classification was made. Remedial measures for the short-term regulated rivers were studied with a literature survey and enquiries. A comprehensive picture of the various effects of short-term regulation was gained in the case study in Oulujoki River (110 km long, 7 power plants). Harmful effects can be reduced with the given recommendations of remedial measures on environment and the usage of the hydro power plants. (orig.) 52 refs.

  18. Feasibility study of VLH hydro turbine installation at Nam Pung hydropower plant, Thailand

    Directory of Open Access Journals (Sweden)

    Weerapon Nuantong

    2016-10-01

    Full Text Available The aim of this research was to study the feasibility of installing a Very Low Head (VLH hydro turbine at downstream of the Nam Pung hydropower plant by increasing the potential of renewable energy sources for the Electricity Generating Authority of Thailand (EGAT. Due to the constraints of the local site, the water head level was limited to less than 2 meters and the flow rate to below 5 m3/ s. The hydro turbine selected was an axial flow turbine with performance of 86.4%. The outcome of the power output was 84.61 kW. Investment analysis was subsequently applied to estimate feasibility of the project using engineering economics. The analyses of results have shown that the project is worthwhile in terms of an investment decision. The payback period of actual price was 0.83 and 0.88 years and general price case of 3.68 and 4.04 years, along with an interest rate of 6.75% and 12.625% respectively. Projected project lifespan is 25 years.

  19. Making the connection: The B.C. Hydro electric system and how it is operated

    International Nuclear Information System (INIS)

    1993-01-01

    British Columbia Hydro supplies electric energy to 93% of the province's population through an integrated electric system. Of the electricity supplied, 95% is generated at 29 hydroelectric plants, with the remainder coming from thermal plants burning fossil fuels. BC Hydro's high voltage transmission and distribution network consists of 17,600 km of lines 60 kV and above and 51,400 km of lines below 60 kV. A description of system operations begins with the principles of hydroelectric generation, with a brief note on thermal generation for peaking or short-term energy production. Non-power operations measures designed to minimize environmental impacts and enhance social benefits are also outlined along with electricity trade with other provinces and the USA. Planning of long- and short-term system operations is also reviewed. An analysis of system components is presented for the Peace, Columbia, Lower Mainland/Coastal/Fraser, and Vancouver Island regions. Finally, information is given on the 29 hydroelectric and 3 thermal plants, including drainage basin, reservoir description and map, inflow, capacity, turbine type, storage, operating constraints, and average energy capability. 51 figs

  20. Constraint-based reachability

    Directory of Open Access Journals (Sweden)

    Arnaud Gotlieb

    2013-02-01

    Full Text Available Iterative imperative programs can be considered as infinite-state systems computing over possibly unbounded domains. Studying reachability in these systems is challenging as it requires to deal with an infinite number of states with standard backward or forward exploration strategies. An approach that we call Constraint-based reachability, is proposed to address reachability problems by exploring program states using a constraint model of the whole program. The keypoint of the approach is to interpret imperative constructions such as conditionals, loops, array and memory manipulations with the fundamental notion of constraint over a computational domain. By combining constraint filtering and abstraction techniques, Constraint-based reachability is able to solve reachability problems which are usually outside the scope of backward or forward exploration strategies. This paper proposes an interpretation of classical filtering consistencies used in Constraint Programming as abstract domain computations, and shows how this approach can be used to produce a constraint solver that efficiently generates solutions for reachability problems that are unsolvable by other approaches.

  1. Times are changing, Hydro-Quebec multiplies its assets

    International Nuclear Information System (INIS)

    Lefevre, M.

    1997-01-01

    Hydro-Quebec''s advance into the North American and world multi-energy market began with the purchase of an interest in the natural gas holding company Noverco, a commercial partnership with Gaz de France, and marketing agreements with Enron and Trigen in the United States. Hydro-Quebec, the world''s sixth largest electric utility, aims to become a multi-energy enterprise selling not only electricity, but also natural gas, oil and certain renewable forms of energy. Currently, Hydro-Quebec is licensed to make border sales of electricity at regulated prices. Through the US Federal Energy Regulatory Commission (FERC), Hydro-Quebec will be able also to sell electricity through wholesale spot contracts with electricity marketers such as Trigen and Enron

  2. Fouling in small hydro projects; Verschmutzung von Kleinwasserkraftwerken - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Abgottspon, A.; Staubli, T.

    2010-03-15

    This comprehensive final report for the Swiss Federal Office of Energy (SFOE) takes a look at fouling problems encountered in small hydro installations. The report is based on ten interviews made with operators of small hydro power stations in Switzerland. A parallel project carried out in Germany is mentioned. A large variation in the degree of fouling in the various hydro power stations is noted. Sources such as leaves in autumn and algae are discussed, as are the various rinsing procedures used to clear the turbines of fouling. Power losses are discussed and measures that can be taken to prevent fouling are described. Measurements made at an installation in Freienstein, Switzerland, are presented and discussed. The report is completed with an appendix containing calculations, details on the Freienstein power plant and the results of interviews made with the ten hydro power installations examined.

  3. Full cost accounting for decision making at Ontario Hydro

    International Nuclear Information System (INIS)

    Plagiannakos, T.

    1996-01-01

    Ontario Hydro's approach to full cost accounting (FCA) was outlined in response to questions raised earlier, in another forum, regarding Ontario Hydro's views on FCA. FCA was defined as an evaluation framework (as opposed to an accounting system) which tries to account for the internal (private) as well as the external (environment and human health) costs and benefits and integrate them into business decisions. When the external impacts cannot be monetized, qualitative evaluations are used based on the damage costing approach, which Ontario Hydro prefers to the cost of control method recommended by its critics. In general, however, Ontario Hydro is not opposed to FCA in so far as it puts the Utility in a better position to make more informed decisions, improve environmental cost management, avoid future costs, enhance revenue, improve environmental quality, contribute to environmental policy, and contribute to sustainable development. 1 fig

  4. Hydro-economic modeling of integrated solutions for the water-energy-land nexus in Africa

    Science.gov (United States)

    Parkinson, S.; Kahil, M.; Wada, Y.; Krey, V.; Byers, E.; Johnson, N. A.; Burek, P.; Satoh, Y.; Willaarts, B.; Langan, S.; Riahi, K.

    2017-12-01

    This study focused on the development of the Extended Continental-scale Hydro-economic Optimization model (ECHO) and its application to the analysis of long-term water, energy and land use pathways for Africa. The framework is important because it integrates multi-decadal decisions surrounding investments into new water infrastructure, electric power generation and irrigation technologies. The improved linkages in ECHO reveal synergies between water allocation strategies across sectors and the greenhouse gas emissions resulting from electricity supply. The African case study features a reduced-form transboundary river network and associated environmental flow constraints covering surface and groundwater withdrawals. Interactions between local water constraints and the continental-scale economy are captured in the model through the combination of regional electricity markets. Spatially-explicit analysis of land availability is used to restrict future reservoir expansion. The analysis demonstrates the massive investments required to ensure rapidly expanding water, energy and food demands in Africa aligned with human development objectives are met in a sustainable way. Modeled constraints on environmental flows in line with presumptive ecological guidelines trigger diffusion of energy-intensive water supply technologies in water-stressed regions, with implications for the cost and speed of the electricity sector decarbonization required to achieve climate targets.

  5. Pumped Storage Hydro Power Plant Cierny Vah

    International Nuclear Information System (INIS)

    Regula, E.

    1998-01-01

    In this leaflet the pump-storage power plant Cierny Vah is presented. A Cierny Vah pumped storage power plant (PSP) has been designed and built for providing the reliable and quality electric energy supply and for covering load changes of an electrification system. (ES). It is mainly the pumped storage hydro power plants plants which in our conditions are the sources operatively covering the sudden changes of the ES load from the ecological, economic but mainly from the operational point of view. The electric energy generation volume is not the primary standpoint but especially their control functions in the ES. During the building of the Cierny Vah PSP the peak operation with the daily accumulation, participation in frequency control and output in ES and the compensation function in ES were to be its main tasks. After putting it into operation by especially after its becoming independent of the Slovak ES in 1994 the static functions (energy generation from pumping, balance output reserves, daily control, ...) gave way to dynamic functions which gained greater importance. After interconnection of the ES with the UCPTE West European Association in which there are besides other things, the strict criteria for observing balance outputs, the main functions of PSPs are as follows: (1) Dynamic services for ES; (2) Dispatching reserve for the fall out of the greatest ES block; (3) Observing the foreign cooperation balance agreed; (4) Compensation of peaks and also of sudden daily load diagram reductions. Technical parameters of the upper and lower reservoir are described. The hydro power plant is a body lower reservoir. In it there are six vertical pumping aggregates in the three machine layout: the motor-generator - the turbine - the pump. Between the turbine and the pump there is a hydraulically controlled claw clutch engaging at rest and disengaging also during the aggregate operation. During pumping air is involved inside the turbine. The Francis turbines have a

  6. Pico hydro turbines for electricity in rural areas

    OpenAIRE

    Descotte, Gérard

    2016-01-01

    This article discusses the feedback and lessons learned, particularly from a survey carried out following the deployment program of a pico hydro power solution in a very isolated rural area in north Laos. This project is part of the strategic development for the rural electrification of Laos, in which pico hydro power facilities constitute the main avenue of progress for the electrification of isolated villages.

  7. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  8. Small hydro plant- present scenario and future prospects

    International Nuclear Information System (INIS)

    Purohit, D.P.

    1996-01-01

    The article, deals with the methodology of power generation by small hydro power resources, especially in the Himalayan and sub Himalayan regions and the benefits it will bestow to the inhabitants of this region. The development of small hydro power projects in the Himalayas and sub Himalayas would serve as a model for environment- friendly sources of energy to benefit small communities world wide. The use of water turbine generators for the generation of cheaper power is also discussed. 4 refs

  9. New directions in nuclear waste disposal in Ontario Hydro

    International Nuclear Information System (INIS)

    Nash, K.

    1996-01-01

    Ontario Hydro Nuclear has financial, environmental, safety and public acceptance business objectives which must be met to achieve long term sustainable success. Short term objectives of achieving nuclear excellence in safety, cost and production are vital to this success. Ontario Hydro's nuclear waste and decommissioning liabilities must be managed within these objectives. This paper outlines the financial environmental and societal considerations and responsibility framework for managing these liabilities. (author)

  10. Reversible pumped hydro - benefits and challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Torbjoern K.; Walseth, Eve C.

    2010-07-01

    Full text: The Norwegian hydro power system is dominated with high head turbines, Pelton and Francis with high capacity in the reservoirs. Originally they were built for secure energy supply. In the system there are also reversible pump turbine (RPT) plants where in times with spare energy, made it possible to pump water from the lower reservoir to the higher. Again the idea was to secure energy supply, which meant pumping in early autumn to fill the reservoirs for winter. In the recent years, a more active use of the RPT plants has been actualized. The free market made price difference between night and day interesting, hence a more frequent pumping was desirable. In the coming years, new-renewable energy sources will utterly enhance a more active use of the RPT plants. More active use of the RPT plants means more frequent starts and stops, both in pumping and in turbine mode. There are a lot of challenges in adopting a new strategy for operating the machinery. More effective start equipment is required. The machinery will be exposed to more frequent dynamic loads; the turbines will be run at part- and full load. The existing RPT plants are connected to huge reservoirs. That means the RPTs are not only for short sighted power regulations, as many RPT-plants in Europe, but are also capable for a substantial energy production. In Norway, the nature is very suitable for RPT plants, both in connection with existing power plants, were reservoirs and conduits are already established, and standing alone with a minimum of energy production. RPTs are, as a design, a compromise between effective generating and stable as well as effective pumping. Stable pumping often results in very steep flow-speed characteristics when operating as a turbine. When dealing with hydraulic transients these characteristics cause a higher change in flow and torque leading to instability during start-up and possible off-design operation point. The instability slows down the synchronization

  11. Short-term hydro-thermal-wind complementary scheduling considering uncertainty of wind power using an enhanced multi-objective bee colony optimization algorithm

    International Nuclear Information System (INIS)

    Zhou, Jianzhong; Lu, Peng; Li, Yuanzheng; Wang, Chao; Yuan, Liu; Mo, Li

    2016-01-01

    Highlights: • HTWCS system is established while considering uncertainty of wind power. • An enhanced multi-objective bee colony optimization algorithm is proposed. • Some heuristic repairing strategies are designed to handle various constraints. • HTWCS problem with economic/environment objectives is solved by EMOBCO. - Abstract: This paper presents a short-term economic/environmental hydro-thermal-wind complementary scheduling (HTWCS) system considering uncertainty of wind power, as well as various complicated non-linear constraints. HTWCS system is formulated as a multi-objective optimization problem to optimize conflictive objectives, i.e., economic and environmental criteria. Then an enhanced multi-objective bee colony optimization algorithm (EMOBCO) is proposed to solve this problem, which adopts Elite archive set, adaptive mutation/selection mechanism and local searching strategy to improve global searching ability of standard bee colony optimization (BCO). Especially, a novel constraints-repairing strategy with compressing decision space and a violation-adjustment method are used to handle various hydraulic and electric constraints. Finally, a daily scheduling simulation case of hydro-thermal-wind system is conducted to verify feasibility and effectiveness of the proposed EMOBCO in solving HTWCS problem. The simulation results indicate that the proposed EMOBCO can provide lower economic cost and smaller pollutant emission than other method established recently while considering various complex constraints in HTWCS problem.

  12. Gas power production, surplus concepts and the transformation of hydro-electric rent into resource rent

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.

    1997-01-01

    The paper considers the effects of introducing large scale gas power production capacity into an electricity sector based on hydropower. In this process the economic rent is transmitted from the hydro power sector to the resource rent in the gas power sector, but is along the way intermingled with ordinary producer surplus and quasi-rent stemming from increasing cost conditions in the production infrastructure and capacity constraints. The net effect on total rent generated depends on development in demand, demand elasticities, costs saved from delaying hydropower projects and the existence of producer surplus in gas power generation. The paper closes with a discussion of possible tax base changes following from the introduction of a thermal power system based on natural gas

  13. Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP). Supplementary task programme

    International Nuclear Information System (INIS)

    1992-06-01

    In the course of Phase II of the Euro-Quebec Hydro-Hydrogen Pilot Project (EQHHPP), it was found that a number of topical aspects required more detail investigations, specific tests etc. than could be cared for within Phase II, under the constraint of available time and funds. Consequently, supplementary tasks have been defined and contracted. This report is the Final Report on the results achieved during the performance of these tasks. The tasks cover a wide field for example LH 2 Airbus studies some can be associated with more than one aspect. The table following hereunder may give an overview over the tasks covered. For all 23 papers a separate subject analysis has been carried out. (orig.)

  14. Production method of hydrogen jet plasma process in hydro machinery

    International Nuclear Information System (INIS)

    Amini, F.

    2007-01-01

    The purpose of present paper is to the process of plasma formation in hydro machinery when a hydro turbine operates at various conditions and load rejection. By investigation the power, shock pressure , and impact effects of hydro machinery, it is revealed that energy and hydrogen are generated by the plasma process. The investigation on several turbines of various hydro power plants reveals that cold fusion process in hydro machinery generates hydrogen. The hypothesis concerning the participation of alkaline metals in river water and the atomic nuclei of the runner blade material in the formation of hydrogen are considered. It is possible to assume hydrogen, deuterium, helium, and tritium atoms (based on Dr. Mizuno and Dr. Kanarev theories) that are formed, diffuse into cavitation bubbles. The plasma is generated during the collapse of the bubble; thus, the quantity of burnt hydrogen determine the volume of generating hydrogen and the impact force caused by hydrogen explosion (noise).There are five main notions, which can determine hydrogen and plasma process: (1) turbine power effect, (2) high shock pressure, (3) crack on turbine parts, (4) impacts effects and (4) the lift of rotating parts. The frequency of the excitation lies in a range from 0.786 to 1.095 Hz.In future, it may be possible to design hydro turbines based on the plasma process that generates hydrogen; or there may exist turbines that rotate with a mixture of hydrogen explosion and water energies

  15. Building a Bright Future. The Hydro Research Foundation's Fellowship Program

    Energy Technology Data Exchange (ETDEWEB)

    Vaughn, Brenna [Hydro Research Foundation, Inc., Evergreen, CO (United States); Linke, Deborah M. [Hydro Research Foundation, Inc., Evergreen, CO (United States)

    2015-12-29

    The Hydro Fellowship Program (program) began as an experiment to discover whether the hydropower industry could find mechanisms to attract new entrants through conducting relevant research to benefit the industry. This nationwide, new-to-the-world program was started through funding from the Wind and Water Power Technologies Office of the Energy Efficiency and Renewable Energy (EERE) Office of the Department of Energy (DOE). Between 2010-2015, the Hydro Research Foundation (HRF) designed and implemented a program to conduct valuable research and attract new entrants to the hydro workforce. This historic grant has empowered and engaged industry members from 25 organizations by working with 91 students and advisors at 24 universities in 19 states. The work funded answered pressing research needs in the fields of civil, mechanical, environmental, and electrical engineering, as well as law, energy engineering and materials innovation. In terms of number of individuals touched through funding, 148 individuals were supported by this work through direct research, mentorship, oversight of the work, partnerships and the day-to-day program administration. Based on the program results, it is clear that the funding achieved the hoped-for outcomes and has the capacity to draw universities into the orbit of hydropower and continue the conversation about industry research and development needs. The Foundation has fostered unique partnerships at the host universities and has continued to thrive with the support of the universities, advisors, industry and the DOE. The Foundation has demonstrated industry support through mentorships, partnerships, underwriting the costs and articulating the universities’ support through in-kind cost sharing. The Foundation recommends that future work be continued to nurture these graduate level programs using the initial work and improvements in the successor program, the Research Awards Program, while stimulating engagement of academia at the

  16. Resources, constraints and capabilities

    NARCIS (Netherlands)

    Dhondt, S.; Oeij, P.R.A.; Schröder, A.

    2018-01-01

    Human and financial resources as well as organisational capabilities are needed to overcome the manifold constraints social innovators are facing. To unlock the potential of social innovation for the whole society new (social) innovation friendly environments and new governance structures

  17. Design with Nonlinear Constraints

    KAUST Repository

    Tang, Chengcheng

    2015-01-01

    . The first application is the design of meshes under both geometric and static constraints, including self-supporting polyhedral meshes that are not height fields. Then, with a formulation bridging mesh based and spline based representations, the application

  18. Antibacterial Activity of the Hydro-Alcoholic Extract of Juglans regia L. Stem Bark on Human Bacterial Infection

    Directory of Open Access Journals (Sweden)

    Moori Bakhtiari N.* PhD,

    2015-12-01

    Full Text Available Aims Bovine mastitis continues to be the most costly disease to the dairy farmers. It dominates in Iran as one of the most prevalent diseases in dairy cattle among the dairy farms. Mastitis treatment with antibiotics leads to the development of antibiotic resistant strains and consumer health problem.This study was performed for the first time to analyze in vitro effects of hydro-alcoholic extract of Juglans regia L. stem bark on 6 mastitis pathogens. Materials & Methods the susceptibility of 6 strains of bacteria (Staphylococcus aureus, Escherichia coli, Klebsiella pneumoniae, Streptococcus spp., Pasteurella multocida and Mannheimia haemolytica were analyzed against hydro-alcoholic extract of Juglans regia L. stem bark with minimum inhibitory concentration (MIC and minimum bactericidal concentration (MBC methods. Findings Hydro-alcoholic extract did not have antibacterial effects on E. coli and K. pneumoniae. Minimum inhibitory concentration for S. aureus, P. multocida, M. haemolytica and Streptococcus spp. was 62.5mg/ml of hydro-alcoholic extract. There was not any significant response with concentrations below 100mg/disc on S. aureus, Streptococcus species, P. multocida and M. haemolytica. Minimum bactericidal concentration of this extract was 100mg/ml in all isolates. Conclusion Juglans regia L. have some antibacterial effects on S. aureus, P. multocida, M. haemolytica and Streptococcus species.

  19. Dynamics and causality constraints

    International Nuclear Information System (INIS)

    Sousa, Manoelito M. de

    2001-04-01

    The physical meaning and the geometrical interpretation of causality implementation in classical field theories are discussed. Causality in field theory are kinematical constraints dynamically implemented via solutions of the field equation, but in a limit of zero-distance from the field sources part of these constraints carries a dynamical content that explains old problems of classical electrodynamics away with deep implications to the nature of physicals interactions. (author)

  20. An overview on small hydro in Brazil

    International Nuclear Information System (INIS)

    Filho, G.T.

    2008-01-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km 2 . It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  1. Environmental flows in hydro-economic models

    Science.gov (United States)

    Pereau, Jean-Christophe; Pryet, Alexandre

    2018-03-01

    The protection of environmental flows, as a management objective for a regulating agency, needs to be consistent with the aquifer water balance and the degree of resource renewability. A stylized hydro-economic model is used where natural recharge, which sustains environmental flows, is considered both in the aquifer water budget and in the welfare function as ecosystem damage. Groundwater recharge and the associated natural drainage may be neglected for aquifers containing fossil water, where the groundwater is mined. However, when dealing with an aquifer that constitutes a renewable resource, for which recharge is not negligible, natural drainage should explicitly appear in the water budget. In doing so, the optimum path of net extraction rate does not necessarily converge to the recharge rate, but depends on the costs associated with ecosystem damages. The optimal paths and equilibrium values for the water volume and water extraction are analytically derived, and numerical simulations based on the Western La Mancha aquifer (southwest Spain) illustrate the theoretical results of the study.

  2. Prepared by Thermal Hydro-decomposition

    Science.gov (United States)

    Prasoetsopha, N.; Pinitsoontorn, S.; Kamwanna, T.; Kurosaki, K.; Ohishi, Y.; Muta, H.; Yamanaka, S.

    2014-06-01

    The polycrystalline samples of Ca3Co4- x Ga x O9+ δ (0 ≤ x ≤ 0.15) were prepared by a simple thermal hydro-decomposition method. The high density ceramics were fabricated using a spark plasma sintering technique. The crystal structure of calcined powders was characterized by x-ray diffraction. The single phase of Ca3Co4- x Ga x O9+ δ was obtained. The scanning electron micrograph illustrated the grain alignment perpendicular to the direction of the pressure in the sintering process. The evidence from x-ray absorption near edge spectra were used to confirm the oxidation state of the Ga dopant. The thermoelectric properties of the misfit-layered of Ca3Co4- x Ga x O9+ δ were investigated. Seebeck coefficient tended to decrease with increasing Ga content due to the hole-doping effect. The electrical resistivity and thermal conductivity were monotonically decreased with increasing Ga content. The Ga doping of x = 0.15 showed the highest power factor of 3.99 × 10-4 W/mK2 at 1,023 K and the lowest thermal conductivity of 1.45 W/mK at 1,073 K. This resulted in the highest ZT of 0.29 at 1,073 K. From the optical absorption spectra, the electronic structure near the Fermi level show no significant change with Ga doping.

  3. An overview on small hydro in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Filho, G.T. [Federal Univ. of Itajuba (Brazil). National Reference Centre for Small Hydro

    2008-07-01

    An overview of small-scale hydro development in Brazil was presented in the context of the Brazilian energy sector. Brazil's energy sector is currently comprised of 45 per cent renewable energy. Brazil is the tenth largest energy producer in the world, with an installed capacity of 105.986 MW. Brazil currently has an estimated 258.410 MW of hydroelectric power potential. Small hydropower (SHP) plants in Brazil are defined as plants capable of producing up to 30 MW of power, with a reservoir area smaller than 12 km{sup 2}. It is estimated that SHP plants will provide 5 per cent of Brazil's electrical supply by 2030. SHP plants in Brazil typically use Kaplan and Pelton hydraulic turbines, as well as Michell-Banki cross-flow turbines. Hydrokinetic turbine prototypes are also being designed at the Federal University of Brazil. Researchers are currently developing a diffuser enhancement design. However, there are currently no designs available that use peripheric generators. Researchers are currently investigating the design of fish-friendly turbines as well as mobile dams. Development projects in the Amazon region were outlined. tabs., figs.

  4. User experience with HydroHelp programs

    Energy Technology Data Exchange (ETDEWEB)

    Verner, J.S. [Brookfield Power, Gatineau, PQ (Canada)

    2009-07-01

    Advances in the field of geographical information systems (GIS) have simplified the process of finding suitable sites for new hydroelectric projects. However, estimating the construction cost remains a challenge. The HydroHelp program is a cost evaluation program developed specifically to determine if a project will be economically feasible. The program is made up of 4 programs, depending on the type of turbine suitable for the site. Once a turbine selection is made, users can choose the program according to Kaplan, Impulse or Francis turbines. Users must rely on GIS, since the program requires a thorough understanding of the site geology and topography. Knowledge of hydroelectric plants is also necessary in order to obtain a credible construction cost. This paper demonstrated the capacity and flexibility of the software along with its different functions and available options. A detailed cost breakdown can be obtained along with an energy estimate and project specifications. In addition, the software can be used to optimize the project through different options by changing the facility's layout in terms of the type of dam, spillway, conduit length and diameter, turbine type and flood level. 17 figs.

  5. Post Chernobyl safety review at Ontario Hydro

    International Nuclear Information System (INIS)

    Frescura, G.M.; Luxat, J.C.; Jobe, C.

    1991-01-01

    It is generally recognized that the Chernobyl Unit 4 accident did not reveal any new phenomena which had not been previously identified in safety analyses. However, the accident provided a tragic reminder of the potential consequences of reactivity initiated accidents (RIAs) and stimulated nuclear plant operators to review their safety analyses, operating procedures and various operational and management aspects of nuclear safety. Concerning Ontario Hydro, the review of the accident performed by the corporate body responsible for nuclear safety policy and by the Atomic Energy Control Board (the Regulatory Body) led to a number of specific recommendations for further action by various design, analysis and operation groups. These recommendations are very comprehensive in terms of reactor safety issues considered. The general conclusion of the various studies carried out in response to the recommendations, is that the CANDU safety design and the procedures in place to identify and mitigate the consequences of accidents are adequate. Improvements to the reliability of the Pickering NGSA shutdown system and to some aspects of safety management and staff training, although not essential, are possible and would be pursued. In support of this conclusion, the paper describes some of the studies that were carried out and discusses the findings. The first part of the paper deals with safety design aspects. While the second is concerned with operational aspects

  6. Hydro-Quebec annual report 1995

    International Nuclear Information System (INIS)

    1995-01-01

    Progress in providing services, in financial and human relations management aspects, and future outlook for Hydro-Quebec was summarized in the 1995 annual report. Environmental policy of the Corporation was updated to reflect international concepts of sustainable development and environment management. A program was launched to remove, recycle and eliminate contaminants. Although generating systems will not be expanded between 1997 and the year 2000, existing generating facilities will be revitalized to improve their capacity and performance. As part of aggressive marketing of surplus capacity abroad, the creation during the past year of the first U.S. subsidiary, HQ Energy Services, was announced. Net income for the year was reported at $390 million, decreased by $277 million since 1994, due to financial pressure created by the commissioning of installations, including those at Phase II of the La Grande complex, and the slowdown in electricity sales in Quebec. A net income of close to $500 million was forecast for 1996. To achieve this target the Corporation announced plans to reduce operating expenses, an exercise which will include staff reductions and a wage freeze. tabs., figs

  7. Hydro makes the most of driftwood

    Energy Technology Data Exchange (ETDEWEB)

    Shinjo, Takahisa [Electric Power Development Company, Tokyo (Japan)

    2001-05-01

    The Electric Power Development Company (EPDC), which owns and operates 58 hydro power plants and controls 40 reservoirs, is reaping benefits from the driftwood collected from the reservoirs. Large amounts of driftwood, litter and illegally dumped wastes are removed from the company's reservoirs every year. The driftwood was previously incinerated but a new processing system is now used which is more cost-effective and has less impact on the environment. EPDC has installed carbonisation kilns and chipping systems at a number of its sites. The end-products (charcoal, wood vinegar and chips) are sold to offset the costs of driftwood processing. The properties of driftwood charcoal make it suitable for a number of applications (eg absorption, deodorisation, soil improvement and humidity control), while pulverised charcoal is sold as a fuel, as a deodorant for drinking water and for humidity control sheets. The wood vinegar has been used as a preservative, in insecticides and to promote plant growth. Refining the wood vinegar has allowed EPDC to develop cosmetics and face creams. Chips are sold to a plywood manufacturer or used as an organic fertiliser.

  8. Momentum constraint relaxation

    International Nuclear Information System (INIS)

    Marronetti, Pedro

    2006-01-01

    Full relativistic simulations in three dimensions invariably develop runaway modes that grow exponentially and are accompanied by violations of the Hamiltonian and momentum constraints. Recently, we introduced a numerical method (Hamiltonian relaxation) that greatly reduces the Hamiltonian constraint violation and helps improve the quality of the numerical model. We present here a method that controls the violation of the momentum constraint. The method is based on the addition of a longitudinal component to the traceless extrinsic curvature A ij -tilde, generated by a vector potential w i , as outlined by York. The components of w i are relaxed to solve approximately the momentum constraint equations, slowly pushing the evolution towards the space of solutions of the constraint equations. We test this method with simulations of binary neutron stars in circular orbits and show that it effectively controls the growth of the aforementioned violations. We also show that a full numerical enforcement of the constraints, as opposed to the gentle correction of the momentum relaxation scheme, results in the development of instabilities that stop the runs shortly

  9. Selection of new constraints

    International Nuclear Information System (INIS)

    Sugier, A.

    2003-01-01

    The selected new constraints should be consistent with the scale of concern i.e. be expressed roughly as fractions or multiples of the average annual background. They should take into account risk considerations and include the values of the currents limits, constraints and other action levels. The recommendation is to select four leading values for the new constraints: 500 mSv ( single event or in a decade) as a maximum value, 0.01 mSv/year as a minimum value; and two intermediate values: 20 mSv/year and 0.3 mSv/year. This new set of dose constraints, representing basic minimum standards of protection for the individuals taking into account the specificity of the exposure situations are thus coherent with the current values which can be found in ICRP Publications. A few warning need however to be noticed: There is no more multi sources limit set by ICRP. The coherence between the proposed value of dose constraint (20 mSv/year) and the current occupational dose limit of 20 mSv/year is valid only if the workers are exposed to one single source. When there is more than one source, it will be necessary to apportion. The value of 1000 mSv lifetimes used for relocation can be expressed into annual dose, which gives approximately 10 mSv/year and is coherent with the proposed dose constraint. (N.C.)

  10. Ekstraksi Minyak Atsiri Dari Akar Wangi Menggunakan Metode Steam - Hydro distillation dan Hydro distilation dengan Pemanas Microwave

    Directory of Open Access Journals (Sweden)

    Maulana M Al Hanief

    2013-09-01

    Full Text Available Penelitian ini bertujuan untuk memperoleh minyak atsiri dari akar wangi dengan modifikasi metode steam-hydro distillation dan hydro distillation yaitu menggunakan pemanasan microwave kemudian membandingkan hasilnya dengan penelitian sebelumnya. Modifikasi ini diharapkan lebih efisien dalam masalah lama penyulingan dan kualitas serta kuantitas rendemen minyak yang lebih baik dan banyak. Penelitian ini menggunakan dua metode yaitu steam-hydro distillation dan hydro distillation dengan pemanfaatan gelombang mikro. Bahan baku yang digunakan dalam penelitian adalah akar wangi jenis pulus wangi yang tumbuh di Kabupaten Garut, Jawa Barat. Variabel yang digunakan adalah bahan baku yang dicacah dan bahan baku utuh dengan variasi massa bahan 50 gr, 60, gr, 70 gr, 80 gr, dan 90 gr dengan pelarut air sebanyak 450 ml dalam labau distiller berukuran 1000 ml. Lama penyulingan adalah lima jam dengan pengamatan tiap 30 menit serta daya yang digunakan adalah 400 Watt. Analisa terhadap hasil minyak atsiri yang diperoleh antara lain analisa GC-MS, spesific gravity, indeks bias, dan bilangan asam. Hasil dari penelitian ini dibandingkan dengan hasil penelitian terdahulu yang tidak memanfaatkan gelombang mikro. Dari hasil penelitian diperoleh % rendemen kumulatif, sifat fisik, sifat kimia, dan kandungan komponen minyak dari metode steam-hydro distillation lebih baik dibandingkan metode hydro distillation ditandai dengan kuantitas dan kualitas yang sesuai dengan SNI.  Sementara itu jika dibandingkan dengan metode terdahulu dapat disimpulkan bahwa penggunaan gelombang mikro lebih efisien dalam waktu dan kuantitas serta kualitas minyak yang lebih baik dibandingkan tanpa penggunaan gelombang mikro

  11. Misconceptions and constraints

    International Nuclear Information System (INIS)

    Whitten, M.; Mahon, R.

    2005-01-01

    In theory, the sterile insect technique (SIT) is applicable to a wide variety of invertebrate pests. However, in practice, the approach has been successfully applied to only a few major pests. Chapters in this volume address possible reasons for this discrepancy, e.g. Klassen, Lance and McInnis, and Robinson and Hendrichs. The shortfall between theory and practice is partly due to the persistence of some common misconceptions, but it is mainly due to one constraint, or a combination of constraints, that are biological, financial, social or political in nature. This chapter's goal is to dispel some major misconceptions, and view the constraints as challenges to overcome, seeing them as opportunities to exploit. Some of the common misconceptions include: (1) released insects retain residual radiation, (2) females must be monogamous, (3) released males must be fully sterile, (4) eradication is the only goal, (5) the SIT is too sophisticated for developing countries, and (6) the SIT is not a component of an area-wide integrated pest management (AW-IPM) strategy. The more obvious constraints are the perceived high costs of the SIT, and the low competitiveness of released sterile males. The perceived high up-front costs of the SIT, their visibility, and the lack of private investment (compared with alternative suppression measures) emerge as serious constraints. Failure to appreciate the true nature of genetic approaches, such as the SIT, may pose a significant constraint to the wider adoption of the SIT and other genetically-based tactics, e.g. transgenic genetically modified organisms (GMOs). Lack of support for the necessary underpinning strategic research also appears to be an important constraint. Hence the case for extensive strategic research in ecology, population dynamics, genetics, and insect behaviour and nutrition is a compelling one. Raising the competitiveness of released sterile males remains the major research objective of the SIT. (author)

  12. The different modes of hydro-economic analysis (Invited)

    Science.gov (United States)

    Harou, J. J.; Binions, O.; Erfani, T.

    2013-12-01

    In the face of growing water demands, climate change and spatial and temporal water access variability, accurately assessing the economic impacts of proposed water resource management changes is useful. The objective of this project funded by UK Water Industry Research was to present and demonstrate a framework for identifying and using the ';value of water' to enable water utilities and their regulators to make better decisions. A hydro-economic model can help evaluate water management options in terms of their hydrological and economic impact at different locations throughout a catchment over time. In this talk we discuss three modes in which hydro-economic models can be implemented: evaluative, behavioral and prescriptive. In evaluation mode economic water demand and benefit functions are used to post-process water resource management model results to assess the economic impacts (over space and time) of a policy under consideration. In behavioral hydro-economic models users are represented as agents and the economics is used to help predict their actions. In prescriptive mode optimization is used to find the most economically efficient management actions such as allocation patterns or source selection. These three types of hydro-economic analysis are demonstrated on a UK watershed (Great River Ouse) that includes 97 different water abstractors from amongst the public water supply, agriculture, industry and energy plant cooling sectors. The following issues under dry and normal historical conditions were investigated: Supply/demand investment planning, societal cost of environmental flows, water market prices, and scarcity-sensitive charges for water rights. The talk discusses which hydro-economic modeling mode is used to study each of these issues and why; example results are shown and discussed. The topic of how hydro-economic models can be built and deployed effectively is covered along with how existing water utility operational and planning tools can be

  13. Deconstructing hydro: the BC electricity sector in this decade

    International Nuclear Information System (INIS)

    Jaccard, M.

    2001-01-01

    This paper provided speculation regarding the world-wide trend to deregulate electric utilities with particular focus on power deregulation in British Columbia. The four main issues facing electricity reform in British Columbia are to determine if publicly-owned assets should be privatised, how to achieve competitive electricity commodity prices in a de-regulated generation market, to determine the extent to which customers will be allowed direct access to sellers of electricity, and to determine which changes in industry structure are needed to ensure that control over the common carrier does not hinder fair competition. BC Hydro recently issued a plan for the next decade entitled the Integrated Electricity Plan which suggests that almost all growth in supply on the Hydro system will be limited to a few large projects totalling 900 megawatts, to be owned and operated by either BC Hydro or by the Columbia Power Corporation, another Crown entity. This plan is in complete contrast to the evolution of the electricity industry nearly everywhere else in the world where demand growth is being met almost entirely by small- and medium-scale non-utility resources issuing from competitive markets with minimal public funding. This article looks at why BC Hydro will probably be transformed significantly, even dismantled, in the coming decade. The article begins with a section explaining the cause and effects of major changes in the world-wide electricity industry. This is followed by a section reviewing what BC Hydro did in the 1990s while reform was taking place. The article also describes what BC Hydro intends to do in the next decade and explores reasons why this outcome is unlikely. The final section of the article provides an alternative vision of BC Hydro's future over the next decade. 1 tab., 3 figs

  14. Overview of Hydrometeorologic Forecasting Procedures at BC Hydro

    Science.gov (United States)

    McCollor, D.

    2004-12-01

    Energy utility companies must balance production from limited sources with increasing demand from industrial, business, and residential consumers. The utility planning process requires a balanced, efficient, and effective distribution of energy from source to consumer. Therefore utility planners must consider the impact of weather on energy production and consumption. Hydro-electric companies should be particularly tuned to weather because their source of energy is water, and water supply depends on precipitation. BC Hydro operates as the largest hydro-electric company in western Canada, managing over 30 reservoirs within the province of British Columbia, and generating electricity for 1.6 million people. BC Hydro relies on weather forecasts of watershed precipitation and temperature to drive hydrologic reservoir inflow models and of urban temperatures to meet energy demand requirements. Operations and planning specialists in the company rely on current, value-added weather forecasts for extreme high-inflow events, daily reservoir operations planning, and long-term water resource management. Weather plays a dominant role for BC Hydro financial planners in terms of sensitive economic responses. For example, a two percent change in hydropower generation, due in large part to annual precipitation patterns, results in an annual net change of \\50 million in earnings. A five percent change in temperature produces a \\5 million change in yearly earnings. On a daily basis, significant precipitation events or temperature extremes involve potential profit/loss decisions in the tens of thousands of dollars worth of power generation. These factors are in addition to environmental and societal costs that must be considered equally as part of a triple bottom line reporting structure. BC Hydro water resource managers require improved meteorological information from recent advancements in numerical weather prediction. At BC Hydro, methods of providing meteorological forecast data

  15. Language-universal constraints on speech segmentation

    NARCIS (Netherlands)

    Norris, D.; McQueen, J.M.; Cutler, A.; Butterfield, S.; Kearns, R.K.

    2001-01-01

    Two word-spotting experiments are reported that examine whether the Possible-Word Constraint (PWC; Norris, McQueen, Cutler & Butterfield, 1997) is a language-specific or language-universal strategy for the segmentation of continuous speech. The PWC disfavors parses which leave an impossible residue

  16. A modified gravitational search algorithm based on a non-dominated sorting genetic approach for hydro-thermal-wind economic emission dispatching

    International Nuclear Information System (INIS)

    Chen, Fang; Zhou, Jianzhong; Wang, Chao; Li, Chunlong; Lu, Peng

    2017-01-01

    Wind power is a type of clean and renewable energy, and reasonable utilization of wind power is beneficial to environmental protection and economic development. Therefore, a short-term hydro-thermal-wind economic emission dispatching (SHTW-EED) problem is presented in this paper. The proposed problem aims to distribute the load among hydro, thermal and wind power units to simultaneously minimize economic cost and pollutant emission. To solve the SHTW-EED problem with complex constraints, a modified gravitational search algorithm based on the non-dominated sorting genetic algorithm-III (MGSA-NSGA-III) is proposed. In the proposed MGSA-NSGA-III, a non-dominated sorting approach, reference-point based selection mechanism and chaotic mutation strategy are applied to improve the evolutionary process of the original gravitational search algorithm (GSA) and maintain the distribution diversity of Pareto optimal solutions. Moreover, a parallel computing strategy is introduced to improve the computational efficiency. Finally, the proposed MGSA-NSGA-III is applied to a typical hydro-thermal-wind system to verify its feasibility and effectiveness. The simulation results indicate that the proposed algorithm can obtain low economic cost and small pollutant emission when dealing with the SHTW-EED problem. - Highlights: • A hybrid algorithm is proposed to handle hydro-thermal-wind power dispatching. • Several improvement strategies are applied to the algorithm. • A parallel computing strategy is applied to improve computational efficiency. • Two cases are analyzed to verify the efficiency of the optimize mode.

  17. Hydro in China: Sino-Canadian cooperation

    International Nuclear Information System (INIS)

    Wiebe, P.A.; Webb, N.K.

    1988-01-01

    Despite a population of over 1 billion, China's installed electric generating capacity is similar to Canada's. To help alleviate the energy shortfalls, the government's seventh 5 year plan (1985-1990) calls for annual installation of new capacity of ca 7,000 MW, the equivalent of a James Bay and Churchill Falls complex every two years. In the short term, 2/3 of new capacity will be filled by thermal stations, but in the longer term, China will turn to its huge undeveloped hydroelectric generating capacity. Information is presented on China's hydroelectric resources, and four hydro projects currently under development in conjunction with Canadian International Project Managers (CIPM), a company whose members are Acres International Inc. of Toronto, Lavalin International Inc. of Montreal and S.N.C. Inc. of Montreal. The Zhao Ping project is a conventional 200 MW project on the Gui River in Guangxi Province in south China, comprising a 73 m high concrete gravity dam and spillway. The Gehe Yan comprises a 151 m high concrete gravity arch dam and spillway and a 1,200 MW powerhouse. The Longtan project would be a 215 m high concrete rockfaced dam with ten 500 MW units and an inclined shiplift with a 500 tonne vessel capacity. The Three Gorges is a multi-purpose water control project that will provide flood control to the regions on the middle reaches of the Yangtze, generate over 8,300 MW of power, and improve navigation on the Yangtze River as far as Chongqing. Up to 750,000 people will have to be resettled to higher land within the river valley. 4 figs., 2 tabs

  18. The HydroShare Collaborative Repository for the Hydrology Community

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of, and collaboration around, "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting our approach to making this system easy to use and serving the needs of the hydrology community represented by the Consortium of Universities for the Advancement of Hydrologic Sciences, Inc. (CUAHSI). Metadata for uploaded files is harvested automatically or captured using easy to use web user interfaces. Users are encouraged to add or create resources in HydroShare early in the data life cycle. To encourage this we allow users to share and collaborate on HydroShare resources privately among individual users or groups, entering metadata while doing the work. HydroShare also provides enhanced functionality for users through web apps that provide tools and computational capability for actions on resources. HydroShare's architecture broadly is comprised of: (1) resource storage, (2) resource exploration website, and (3) web apps for actions on resources. System components are loosely coupled and interact through APIs, which enhances robustness, as components can be upgraded and advanced relatively independently. The full power of this paradigm is the

  19. Occupational dose constraint

    International Nuclear Information System (INIS)

    Heilbron Filho, Paulo Fernando Lavalle; Xavier, Ana Maria

    2005-01-01

    The revision process of the international radiological protection regulations has resulted in the adoption of new concepts, such as practice, intervention, avoidable and restriction of dose (dose constraint). The latter deserving of special mention since it may involve reducing a priori of the dose limits established both for the public and to individuals occupationally exposed, values that can be further reduced, depending on the application of the principle of optimization. This article aims to present, with clarity, from the criteria adopted to define dose constraint values to the public, a methodology to establish the dose constraint values for occupationally exposed individuals, as well as an example of the application of this methodology to the practice of industrial radiography

  20. Psychological constraints on egalitarianism

    DEFF Research Database (Denmark)

    Kasperbauer, Tyler Joshua

    2015-01-01

    processes motivating people to resist various aspects of egalitarianism. I argue for two theses, one normative and one descriptive. The normative thesis holds that egalitarians must take psychological constraints into account when constructing egalitarian ideals. I draw from non-ideal theories in political...... philosophy, which aim to construct moral goals with current social and political constraints in mind, to argue that human psychology must be part of a non-ideal theory of egalitarianism. The descriptive thesis holds that the most fundamental psychological challenge to egalitarian ideals comes from what......Debates over egalitarianism for the most part are not concerned with constraints on achieving an egalitarian society, beyond discussions of the deficiencies of egalitarian theory itself. This paper looks beyond objections to egalitarianism as such and investigates the relevant psychological...

  1. Statement to the Select Committee of the Legislature by the Minister of Energy on Ontario Hydro's uranium supply contracts with Denison Mines Ltd. and Preston Mines Ltd

    International Nuclear Information System (INIS)

    1978-01-01

    Contracts between Ontario Hydro and two uranium suppliers, Denison Mines and Preston Mines, provide the utility with an assured supply of uranium from 1980 to 2011 at below world price, and give the suppliers financial aid in expanding their facilities. The total value of these contracts in 1978 dollars is $6.3 billion. Ontario Hydro decided to seek long-term supply contracts because there is expected to be continuing pressure on available uranium supplies wth steadily rising prices. The government of Ontario believes the contracts to be in the public interest. (LL)

  2. Impact of flocculation on flotation tailing's hydro-cycloning properties

    Directory of Open Access Journals (Sweden)

    Knežević Dinko N.

    2014-01-01

    Full Text Available Research results of hydro-cycloning of flocculated and non-flocculated flotation tailing from the lead and zinc open pit mine 'Suplja stijena', Sula - Montenegro have been shown in this paper. Reason for this research was finding conditions in order to separate fraction that is suitable for embankment erection. Flotation tailings has been tested in the very state that it goes out from the flotation process and tailings which is flocculated by anionic flocculant. The object was to determine the impact of flocculation on properties of hydro-cycloning products and disposal process. In hydro-cycloning process greater underflow mass is being separated with non-flocculated tailing. Values of geomechanical parameters are significantly different, especially hydro-cyclone's underflow. All geomechanical parameters of hydro-cyclone's underflow are suitable for erecting embankment which shall be made from non-flocculated tailing. Underflow drainage of non-flocculated tailing is faster while overflow drainage is slower and problematic with both tailings.

  3. Canadian hydro potential in the North American market

    International Nuclear Information System (INIS)

    Adams, K.

    2002-01-01

    Canada's hydro potential in the North American energy market was discussed. Canada is a net exporter of electricity in North America, and since 1990, has exported an average of 28 Terawatt hours/year to the United States. More than 65 per cent of these exports were generated from hydro power plants. It was emphasized that significant reductions in greenhouse gases can be achieved if Canadian hydroelectricity is substituted for coal power generation. It was also noted that although there may not be enough hydro capacity to meet all of North America's energy requirements, development of new large hydro resources in Canada could help meet the growing demand for electricity in the United States. Hydro can also complement other renewable energy sources such as wind and solar. The factors that will determine if Canadian hydropower will contribute to the energy demand are market mechanisms such as greenhouse gas credit trading systems which provide incentive for renewable energy projects. In addition, the existing infrastructure must be expanded both east and west within Canada and north and south between Canada and the United States. 5 figs

  4. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  5. Electronic Control Of Small Hydro-Generators Part II

    International Nuclear Information System (INIS)

    Diaz B, Pedro; Torres M, Carlos A.

    1994-01-01

    The present project arises for the Colombian population's necessity to overcome the underdevelopment, the poverty, the education and the level of life in rural areas of difficult access, for an economic rural electrification. The UIS, by means of the advisory committee of investigations of the ability of Physical-mechanical Sciences and the ability of Electricity and Electronic, it begins the process of developing in 1991 a study of economic and reliable control for the handling of small micro-centrals. Providing from electric power to the rural sector is a world problem, and have more than enough this some countries (China, Nepal, Peru, The islands of Papua, New Guinea), they have made investigations, outlining and building central micro controlled by microprocessor. The present study is developed with the objective of carrying out a load control that acts reliable and quickly. Traditionally they have been come using mechanical governors, which are those in charge of making the load control by means of valves that regulate the flow of water in the turbines, involving this way big retards characteristic of any mechanical control. In summary, the electronic governor of load presents on the mechanical governor, the advantage of acting to more speed and consequently to maintain stable the frequency of the system. To continue with the study, the objective that this project must develop, is an electronic control of load which presents to a small hydro generator, a relatively constant and independent electric load that the demanded consumption for the user varies from none to full load, given as initial parameters a constant flow in the turbine and a control in the line tension. This way it seeks to improve the energy quality given by isolated generators

  6. Multi-objective differential evolution with adaptive Cauchy mutation for short-term multi-objective optimal hydro-thermal scheduling

    Energy Technology Data Exchange (ETDEWEB)

    Qin Hui [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Zhou Jianzhong, E-mail: jz.zhou@hust.edu.c [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China); Lu Youlin; Wang Ying; Zhang Yongchuan [College of Hydropower and Information Engineering, Huazhong University of Science and Technology, Wuhan 430074 (China)

    2010-04-15

    A new multi-objective optimization method based on differential evolution with adaptive Cauchy mutation (MODE-ACM) is presented to solve short-term multi-objective optimal hydro-thermal scheduling (MOOHS) problem. Besides fuel cost, the pollutant gas emission is also optimized as an objective. The water transport delay between connected reservoirs and the effect of valve-point loading of thermal units are also taken into account in the presented problem formulation. The proposed algorithm adopts an elitist archive to retain non-dominated solutions obtained during the evolutionary process. It modifies the DE's operators to make it suit for multi-objective optimization (MOO) problems and improve its performance. Furthermore, to avoid premature convergence, an adaptive Cauchy mutation is proposed to preserve the diversity of population. An effective constraints handling method is utilized to handle the complex equality and inequality constraints. The effectiveness of the proposed algorithm is tested on a hydro-thermal system consisting of four cascaded hydro plants and three thermal units. The results obtained by MODE-ACM are compared with several previous studies. It is found that the results obtained by MODE-ACM are superior in terms of fuel cost as well as emission output, consuming a shorter time. Thus it can be a viable alternative to generate optimal trade-offs for short-term MOOHS problem.

  7. Spatial patterns of hydro-social metrics in the Northeastern United States from the Colonial Era through the Industrial Revolution (1600-1920)

    Science.gov (United States)

    Witherell, B. B.; Bain, D. J.; Salant, N.; Aloysius, N. R.

    2009-12-01

    Humans impact the hydrologic cycle at local, regional and global scales. Understanding how spatial patterns of human water use and hydrologic impact have changed over time is important to future water management in an era of increasing water constraints and globalization of high water-use resources. This study investigates spatial dependence and spatial patterns of hydro-social metrics for the Northeastern United States from 1600 to 1920 through the use of spatial statistical techniques. Several relevant hydro-social metrics, including water residence time, surface water storage (natural and human engineered) and per capita water availability, are analyzed. This study covers a region and period of time that saw significant population growth, landscape change, and industrial growth. These changes had important impacts on water availability. Although some changes such as the elimination of beavers, and the resulting loss of beaver ponds on low-order streams, are felt at a regional scale, preliminary analysis indicates that humans responded to water constraints by acting locally (e.g., mill ponds for water power and water supply reservoirs for public health). This 320-year historical analysis of spatial patterns of hydro-social metrics provides unique insight into long-term changes in coupled human-water systems.

  8. Power and pay: The union and equal pay at B.C. Electric/Hydro

    International Nuclear Information System (INIS)

    Creese, G.

    1993-01-01

    The struggle for equal pay for women in one large office union, the Office and Technical Employees' Union (OTEU), at British Columbia Electric/Hydro is analyzed. The analysis concentrates on the second phase of the equal pay movement that preoccupied the union for over 30 years starting in 1949. Equal pay for equal job-evaluation was finally achieved in 1981, yet this struggle did not produce a subsequent questioning of gender bias within the job evaluation process or the structure of the existing hierarchy of jobs. The study illustrates some of the ways that gender hierarchies and inequities are defined and reinforced by employers seeking to maintain profits by keeping labor costs down, as BC Electric/Hydro resisted eliminating the differential in male and female pay, systematically restructured unequal pay, and continually resorted to lower community standards even when the company's own job evaluation system suggested equal comparators with male jobs. Gendered jobs are also shaped by union practices, as evidenced by the OTEU's role in restructuring the postwar gender division of labor in the late 1940s, as well as their early and persistent challenges to the female differential but, at the same time, the continued marginalization of equal pay as a women's issue rather than a general union issue. 66 refs

  9. Power and pay: The union and equal pay at B. C. Electric/Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Creese, G

    The struggle for equal pay for women in one large office union, the Office and Technical Employees' Union (OTEU), at British Columbia Electric/Hydro is analyzed. The analysis concentrates on the second phase of the equal pay movement that preoccupied the union for over 30 years starting in 1949. Equal pay for equal job-evaluation was finally achieved in 1981, yet this struggle did not produce a subsequent questioning of gender bias within the job evaluation process or the structure of the existing hierarchy of jobs. The study illustrates some of the ways that gender hierarchies and inequities are defined and reinforced by employers seeking to maintain profits by keeping labor costs down, as BC Electric/Hydro resisted eliminating the differential in male and female pay, systematically restructured unequal pay, and continually resorted to lower community standards even when the company's own job evaluation system suggested equal comparators with male jobs. Gendered jobs are also shaped by union practices, as evidenced by the OTEU's role in restructuring the postwar gender division of labor in the late 1940s, as well as their early and persistent challenges to the female differential but, at the same time, the continued marginalization of equal pay as a women's issue rather than a general union issue. 66 refs.

  10. Constraint-based scheduling applying constraint programming to scheduling problems

    CERN Document Server

    Baptiste, Philippe; Nuijten, Wim

    2001-01-01

    Constraint Programming is a problem-solving paradigm that establishes a clear distinction between two pivotal aspects of a problem: (1) a precise definition of the constraints that define the problem to be solved and (2) the algorithms and heuristics enabling the selection of decisions to solve the problem. It is because of these capabilities that Constraint Programming is increasingly being employed as a problem-solving tool to solve scheduling problems. Hence the development of Constraint-Based Scheduling as a field of study. The aim of this book is to provide an overview of the most widely used Constraint-Based Scheduling techniques. Following the principles of Constraint Programming, the book consists of three distinct parts: The first chapter introduces the basic principles of Constraint Programming and provides a model of the constraints that are the most often encountered in scheduling problems. Chapters 2, 3, 4, and 5 are focused on the propagation of resource constraints, which usually are responsibl...

  11. BC Hydro's business plan: a summary of BC Hydro's strategic business plan and performance measures

    International Nuclear Information System (INIS)

    2000-04-01

    This document contains a summary of BC Hydro's Strategic Plan and performance measures. The plan has been prepared in response to the recommendations of the Budget Process Review Panel, convened by the BC Government, which recommended that each public body, crown corporation, and other agencies of government, prepare an annual three year business plan. The document reviews the utility's current situation, provides an outline of the company's vision of its role, its mission and values, its strategic objectives (effective governance, efficiency and productivity; service excellence and value-added solutions; market development ; strong and capable organization) and the tools to be utilized in measuring performance. Various strategic issues (financial resources, the need to protect and enhance the value of electricity trading; the impact of information technology; power technology development; environmental trends and 'green energy' initiatives; workforce training and development) are also highlighted

  12. Micro-hydro power: reviewing an old concept

    Energy Technology Data Exchange (ETDEWEB)

    Alward, R.; Eisenbart, S.; Volkman, J.

    1979-01-01

    This informaion package has been prepared to respond to an increasing number of requests for information on micro-hydro systems. It contains a resource directory, which is an attempt to put the reader in contact with the literature, plans, people, and companies appropriate to needs. On a world-wide basis, small-scale, environmentally benign, mechanical, and electrical hydropower systems are common. These are the systems for individual homes, farm, and shop use and generally have power outputs less than 100 kW. For convenience in terminology, this scale of hydro power is referred to as micro-hydro. A decision tree is first presented followed by information on determining the suitability of th site, equipment, economics, sources for financial assistance, regulatory conflicts, cautions and suggestions for the Do-It-Yourselfer, and the Self-Installer, manufacturers and suppliers, and sources of professional services. An annotated bibliography of 16 references is provided. (MCW)

  13. Hydro-Quebec line crew returns home from Haiti

    Energy Technology Data Exchange (ETDEWEB)

    Horne, D.

    2005-04-01

    This article recounted the experience of a 14-member Hydro-Quebec line crew and support group that travelled to Haiti in November 2004 to help re-establish essential electricity services. The work was conducted together with Electricite d'Haiti (EDH). The team installed 400 poles, 10 km of conductors and 85 transformers, restoring service to water pumps; La Providence and Raboteau hospitals; a centre housing Doctors without borders; a CARE distribution centre; and several convents and schools. The installation of street lights at strategic points allowed lighting to be restored in several districts of Gonaives. Hydro-Quebec was able to extend their mission to Haiti and purchase more poles and transformers with the help of a $500,000 contribution from the Canadian International Development Agency. Hydro-Quebec was the only company who came to the aid of EDH. The total budget for the project was $4 million. 2 figs.

  14. Hydro-Quebec opens up, expects positive reaction from FERC

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1997-01-01

    Hydro-Quebec Energy Services US (HQUS), the marketing arm of Hydro-Quebec, amended its application for a power marketing licence with the Federal Energy Regulatory Commission (FERC), by offering to open up five per cent of the wholesale Quebec electricity market to competition. The Corporation hopes that its revised application will satisfy FERC to grant HQUS a power marketer licence, with the right to sell electricity in the US at market-based rates. Hydro-Quebec insiders believe that in addition to opening up the market to competition, thereby equalizing market conditions on both sides of the border, the Corporation's chances of receiving the licence also have been improved by the creation of the provincial energy board (Regie de l'energie) which in future will regulate electricity and gas transmission through Quebec, and establish transmission tariffs. FERC ruling is expected within 60 days of the March 7, 1997 amended application

  15. Environmental impact and benefit from hydro-energy: Bulgarian case

    International Nuclear Information System (INIS)

    Vesselinov, V.; Iotova, A.

    1996-01-01

    The present hydro energy system in Bulgaria has been constructed mainly in the period 1950-1965. The currently utilized hydro-power potential, only 33% of the estimated technical potential, includes 87 HPP operating in 1991. A complex assessment of the environmental impact of the hydro energy objects as well as a comparative analysis of all energy sources in Bulgaria is made in the framework of Bulgarian Case Study of the DECADES Inter-Agency Project. The main types of environmental impact related to HPP operation are presented in 7 specific categories: land requirements, changes in the landscape, hydrological changes, micro-climatic changes, geodynamic changes, risk from man-made activities; generation of new ecosystems. A technique of expertise in ball is proposed as a suitable quantitative approach for more precise assessment of impact on climate factors from different energy sources. 2 tabs., 5 refs

  16. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  17. Ontario Hydro at the millennium : has monopoly's moment passed?

    International Nuclear Information System (INIS)

    Daniels, R.J.

    1996-01-01

    This volume is a collection of 10 papers presented at a conference in which the challenges of restructuring the electric power industry in Ontario were discussed. Legal experts, policy makers, economists and stakeholders in the industry presented their views regarding the future of the industry in Ontario. The implications of privatization were discussed. There was general agreement on the need for some industry de-integration and privatization. However, agreement on the exact nature of the approach to take was more divided. For example, opinion was divided on what the logical endpoint of industry restructuring should be i.e. wholesale or retail competition. Also contentious was the question of what portion of Hydro's generating assets should be sold off to private enterprise if Hydro's generation and transmission assets are unbundled. Opinions were also divided about the environmental consequences of nuclear energy. Significant differences of opinion were evident concerning the privatization of Ontario Hydro's nuclear assets. refs., tabs., figs

  18. PCB management at Manitoba Hydro's Waverley Service Centre

    International Nuclear Information System (INIS)

    Rempel, R.G.; Engstrom, T.

    1996-01-01

    Manitoba Hydro was the first Canadian utility to initiate a program to decontaminate insulating oil contaminated with polychlorinated biphenyls (PCBs). This paper describes Manitoba Hydro's recovery, reuse and recycling program, operated out of the utility's Waverley Service Centre (WSC). The WSC is a central facility serving to phase out and and destroy PCBs which remain in Manitoba Hydro's electrical system. Several hundred thousand litres of PCB-contaminated insulating oil are decontaminated annually at the WSC. The decontaminated oil is then reconditioned for reuse within the system operations. A PCBX unit was purchased from Sun Ohio for the decontamination of insulating oils containing PCBs. PCB decontamination is achieved through a chemical dechlorination treatment process. The PCBX treatment unit and the PCB storage building were described. 18 refs., 8 figs

  19. Ontario Hydro's transportation of radioactive material and emergency response plan

    International Nuclear Information System (INIS)

    Karmali, N.

    1993-01-01

    Ontario Hydro has been transporting radioactive material for almost 30 years without any exposure to the public or release to the environment. However, there have been three accidents involving Hydro's shipments of radioactive material. In addition to the quality packaging and shipping program, Ontario Hydro has an Emergency Response Plan and capability to deal with an accident involving a shipment of radioactive material. The Corporation's ability to respond, to effectively control and contain the situation, site remediation, and to provide emergency public information in the event of a road accident minimizes the risk to the public and the environment. This emphasizes their commitment to worker safety, public safety and impact to the environment. Response capability is mandated under various legislation and regulations in Canada

  20. Constraints on Dbar uplifts

    International Nuclear Information System (INIS)

    Alwis, S.P. de

    2016-01-01

    We discuss constraints on KKLT/KKLMMT and LVS scenarios that use anti-branes to get an uplift to a deSitter vacuum, coming from requiring the validity of an effective field theory description of the physics. We find these are not always satisfied or are hard to satisfy.

  1. Ecosystems emerging. 5: Constraints

    Czech Academy of Sciences Publication Activity Database

    Patten, B. C.; Straškraba, Milan; Jorgensen, S. E.

    2011-01-01

    Roč. 222, č. 16 (2011), s. 2945-2972 ISSN 0304-3800 Institutional research plan: CEZ:AV0Z50070508 Keywords : constraint * epistemic * ontic Subject RIV: EH - Ecology, Behaviour Impact factor: 2.326, year: 2011 http://www.sciencedirect.com/science/article/pii/S0304380011002274

  2. Constraints and Ambiguity

    DEFF Research Database (Denmark)

    Dove, Graham; Biskjær, Michael Mose; Lundqvist, Caroline Emilie

    2017-01-01

    groups of students building three models each. We studied groups building with traditional plastic bricks and also using a digital environment. The building tasks students undertake, and our subsequent analysis, are informed by the role constraints and ambiguity play in creative processes. Based...

  3. Hydro biological investigations of lake Drukshiai

    International Nuclear Information System (INIS)

    Mazheikaite, S.; Sinkevichiene, Z.; Marchiulioniene, D.; Astrauskas, A.; Barshiene, J.

    1998-01-01

    Purposes of this research were to investigate changes in the physical, chemical and tropic conditions of Lake Drukshiai caused by the combined effect of Ignalina NPP and how it effects on structures and function of biocenoses; to estimate the influence of phytocenoses, zoocenoses and bacteriocenoses on the quality of water in Lake Drukshiai; to estimate the eco toxicological state of Lake Drukshiai. According to the complex hydro biological investigations on Lake Drukshiai - Ignalina NPP cooler great changes in planktonic organism community, tendencies of those changes in different ecological zones were evaluated in 1993 - 1997. The amount of species of most dominant planktonic organisms in 1993 - 1997 decreased 2-3 times in comparison with that before Ignalina NPP operation: phytoplankton from 116 to 40 - 50, zooplankton - from 233 to 139. The organic matter increasing tendency was determined in bottom sediments of the lake. The highest amount of it was evaluated in the south - eastern part of the lake. 69 water macrophyte species were found in bottom sediments during the investigation period. 16 species were not found in this lake earlier. Abundance of filamentous green algae was registered.The rates of fish communities successional transformation were ten times in excess of those of the given processes in natural lakes. Moreover the comparison of results on Lake Drukshiai bioindication analysis with changes of comparable bio markers which were obtained from other water systems of Lithuania, Switzerland, Sweden and Poland, including those with active nuclear power plants in their environment was carried out. It was determined that the functional and structural changes in Lake Drukshiai biota are mostly caused by chemical pollution. It was found out that the frequency of cytogenetic damage emerged as a specific radionuclide - caused effect in aquatic organisms inhabiting Lake Drukshiai, is slightly above the background level and is 5 times lower than the same

  4. HydroSHEDS: A global comprehensive hydrographic dataset

    Science.gov (United States)

    Wickel, B. A.; Lehner, B.; Sindorf, N.

    2007-12-01

    The Hydrological data and maps based on SHuttle Elevation Derivatives at multiple Scales (HydroSHEDS) is an innovative product that, for the first time, provides hydrographic information in a consistent and comprehensive format for regional and global-scale applications. HydroSHEDS offers a suite of geo-referenced data sets, including stream networks, watershed boundaries, drainage directions, and ancillary data layers such as flow accumulations, distances, and river topology information. The goal of developing HydroSHEDS was to generate key data layers to support regional and global watershed analyses, hydrological modeling, and freshwater conservation planning at a quality, resolution and extent that had previously been unachievable. Available resolutions range from 3 arc-second (approx. 90 meters at the equator) to 5 minute (approx. 10 km at the equator) with seamless near-global extent. HydroSHEDS is derived from elevation data of the Shuttle Radar Topography Mission (SRTM) at 3 arc-second resolution. The original SRTM data have been hydrologically conditioned using a sequence of automated procedures. Existing methods of data improvement and newly developed algorithms have been applied, including void filling, filtering, stream burning, and upscaling techniques. Manual corrections were made where necessary. Preliminary quality assessments indicate that the accuracy of HydroSHEDS significantly exceeds that of existing global watershed and river maps. HydroSHEDS was developed by the Conservation Science Program of the World Wildlife Fund (WWF) in partnership with the U.S. Geological Survey (USGS), the International Centre for Tropical Agriculture (CIAT), The Nature Conservancy (TNC), and the Center for Environmental Systems Research (CESR) of the University of Kassel, Germany.

  5. 75 FR 18191 - City of Raleigh; Community Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Science.gov (United States)

    2010-04-09

    ...: Mr. Thomas A. McCormick, Raleigh City Attorney, P.O. Box 590, Raleigh, North Carolina 27601, e-mail tom.mccormick@ci.raleigh.nc.us . For Community Hydro, LLC: Lori Barg, Community Hydro, LLC, 113...

  6. 76 FR 8728 - Bear Creek Hydro Associates, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-02-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13951-000] Bear Creek Hydro..., Motions To Intervene, and Competing Applications On December 22, 2010, the Bear Creek Hydro Associates... (FPA), proposing to study the [[Page 8729

  7. The HydroServer Platform for Sharing Hydrologic Data

    Science.gov (United States)

    Tarboton, D. G.; Horsburgh, J. S.; Schreuders, K.; Maidment, D. R.; Zaslavsky, I.; Valentine, D. W.

    2010-12-01

    The CUAHSI Hydrologic Information System (HIS) is an internet based system that supports sharing of hydrologic data. HIS consists of databases connected using the Internet through Web services, as well as software for data discovery, access, and publication. The HIS system architecture is comprised of servers for publishing and sharing data, a centralized catalog to support cross server data discovery and a desktop client to access and analyze data. This paper focuses on HydroServer, the component developed for sharing and publishing space-time hydrologic datasets. A HydroServer is a computer server that contains a collection of databases, web services, tools, and software applications that allow data producers to store, publish, and manage the data from an experimental watershed or project site. HydroServer is designed to permit publication of data as part of a distributed national/international system, while still locally managing access to the data. We describe the HydroServer architecture and software stack, including tools for managing and publishing time series data for fixed point monitoring sites as well as spatially distributed, GIS datasets that describe a particular study area, watershed, or region. HydroServer adopts a standards based approach to data publication, relying on accepted and emerging standards for data storage and transfer. CUAHSI developed HydroServer code is free with community code development managed through the codeplex open source code repository and development system. There is some reliance on widely used commercial software for general purpose and standard data publication capability. The sharing of data in a common format is one way to stimulate interdisciplinary research and collaboration. It is anticipated that the growing, distributed network of HydroServers will facilitate cross-site comparisons and large scale studies that synthesize information from diverse settings, making the network as a whole greater than the sum of its

  8. Hydro models and salmon recovery in the northwest

    International Nuclear Information System (INIS)

    Dragoon, K.

    1993-01-01

    Hydro regulation models provide extensive support for analyzing the efficacy of salmon recovery plans in the Northwest. Power planners developed these computer programs to help plan and efficiently operate a large multiple use river system. The models represent physical relationships and operational requirements on the system. They also simulate coordinated system operations for efficient power generation. These models are being pressed into service to provide data for fish recovery plans. They provide important information about hydro system capabilities and responses to recovery programs. However, the models cannot meet all of the analytical needs of fish biologists working toward salmon recovery

  9. A Full Hydro- and Morphodynamic Description of Breaker Bar Development

    DEFF Research Database (Denmark)

    Jacobsen, Niels Gjøl

    The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach is the su......The present thesis considers a coupled modelling approach for hydro- and morphodynamics in the surf zone, which is based on a solution to the Reynolds Averaged Navier-Stokes (RANS) equations with a Volume of Fluid (VOF) closure for the surf tracking. The basis for the numerical approach...

  10. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  11. Towards A Grid Infrastructure For Hydro-Meteorological Research

    Directory of Open Access Journals (Sweden)

    Michael Schiffers

    2011-01-01

    Full Text Available The Distributed Research Infrastructure for Hydro-Meteorological Study (DRIHMS is a coordinatedaction co-funded by the European Commission. DRIHMS analyzes the main issuesthat arise when designing and setting up a pan-European Grid-based e-Infrastructure for researchactivities in the hydrologic and meteorological fields. The main outcome of the projectis represented first by a set of Grid usage patterns to support innovative hydro-meteorologicalresearch activities, and second by the implications that such patterns define for a dedicatedGrid infrastructure and the respective Grid architecture.

  12. Small hydro takes stock of a dozen years of activity

    International Nuclear Information System (INIS)

    Leutwiler, H.

    2000-01-01

    This short article discusses a survey that takes stock of the investments made in small hydro schemes in Switzerland since 1985 and the structural changes in this area that have occurred. Typical figures are given for investments and the increase in energy production that have resulted. The various possibilities for the realisation of small hydro installations are discussed including pressure-reduction turbines, the use of turbines in drinking water and wastewater systems. The importance of the sale of the electricity thus generated as 'green' power is noted. The potential of this form of electricity generation in a liberalised electricity market and the obstacles placed in its way are discuss

  13. Decision making algorithms for hydro-power plant location

    CERN Document Server

    Majumder, Mrinmoy

    2013-01-01

    The present study has attempted to apply the advantage of neuro-genetic algorithms for optimal decision making in maximum utilization of natural resources. Hydro-power is one of the inexpensive, but a reliable source of alternative energy which is foreseen as the possible answer to the present crisis in the energy sector. However, the major problem related to hydro-energy is its dependency on location. An ideal location can produce maximum energy with minimum loss. Besides, such power-plant also requires substantial amount of land which is a precious resource nowadays due to the rapid and unco

  14. Neuro-fuzzy modelling of hydro unit efficiency

    International Nuclear Information System (INIS)

    Iliev, Atanas; Fushtikj, Vangel

    2003-01-01

    This paper presents neuro-fuzzy method for modeling of the hydro unit efficiency. The proposed method uses the characteristics of the fuzzy systems as universal function approximates, as well the abilities of the neural networks to adopt the parameters of the membership's functions and rules in the consequent part of the developed fuzzy system. Developed method is practically applied for modeling of the efficiency of unit which will be installed in the hydro power plant Kozjak. Comparison of the performance of the derived neuro-fuzzy method with several classical polynomials models is also performed. (Author)

  15. A Rock Mechanics and Coupled Hydro mechanical Analysis of Geological Repository of High Level Nuclear Waste in Fractured Rocks

    International Nuclear Information System (INIS)

    Min, Kibok

    2011-01-01

    This paper introduces a few case studies on fractured hard rock based on geological data from Sweden, Korea is one of a few countries where crystalline rock is the most promising rock formation as a candidate site of geological repository of high level nuclear waste. Despite the progress made in the area of rock mechanics and coupled hydro mechanics, extensive site specific study on multiple candidate sites is essential in order to choose the optimal site. For many countries concerned about the safe isolation of nuclear wastes from the biosphere, disposal in a deep geological formation is considered an attractive option. In geological repository, thermal loading continuously disturbs the repository system in addition to disturbances a recent development in rock mechanics and coupled hydro mechanical study using DFN(Discrete Fracture Network) - DEM(Discrete Element Method) approach mainly applied in hard, crystalline rock containing numerous fracture which are main sources of deformation and groundwater flow

  16. AAR at Hydro-Quebec : a review of field cases and intervention strategies

    Energy Technology Data Exchange (ETDEWEB)

    Durand, B. [Hydro-Quebec, Varennes, PQ (Canada). IREQ

    2006-07-01

    Hydro-Quebec owns and operates more than 560 dams, including 200 dams that are classified as large dams. By 2010, approximately 150 of the concrete dams will be at least 50 years old, and nearly 100 of the dams will be 70 years old. The current condition of these structures reflects the influence of several factors that have promoted aging, such as initial shrinkage causing latent microcracking; expansion and contraction related to temperature cycles; larger infiltration entailing increased uplift; leaching and deposition of calcium salts that clog joints and drains; hydric swelling; freezing and thawing cycles; erosion; sulfation; and, alkali-aggregate reactions (AAR). This paper focused on the swelling due to AAR, since more than 20 dams have been affected by this condition. Hydro-Quebec's approach to prevent AAR was described. In response to Canadian Standards Association (CSA) concrete expansion tests, Hydro-Quebec no longer allows admixtures for its concrete structures. Rather, non-reactive aggregates are used in the concrete. This paper also discussed the evaluation of residual expansion time caused by the alkali-silica reaction (ASR), which has affected the dam at La Tuque in the Mauricie Region. Results of laboratory expansion tests have been compared with the average expansion rate measured at the La Tuque dam. It was estimated that the concrete should continue to swell for at least 20 years at the same rate as measured since 1979. After that, expansion may possibly slow down due to self-confinement in the concrete. However, if confinement increases in 2 directions, it is probable that the expansion accelerates in the third direction. 26 refs., 3 tabs., 8 figs.

  17. An artificial intelligence (AI) NOx/heat rate optimization system for Ontario Hydro`s fossil generating stations

    Energy Technology Data Exchange (ETDEWEB)

    Luk, J.; Frank, A.; Bodach, P. [Ontario Hydro, Toronto, ON (Canada); Warriner, G. [Radian International, Tucker, GA (United States); Noblett, J. [Radian International, Austin, TX (United States); Slatsky, M. [Southern Company, Birmingham, AL (United States)

    1999-08-01

    Artificial intelligence (AI)-based software packages which can optimize power plant operations that improves heat rate and also reduces nitrogen oxide emissions are now commonly available for commercial use. This paper discusses the implementation of the AI-based NOx and Heat Rate Optimization System at Ontario Hydro`s generation stations, emphasizing the current AI Optimization Project at Units 5 and 6 of the Lakeview Generating Station. These demonstration programs are showing promising results in NOx reduction and plant performance improvement. The availability of the plant Digital Control System (DCS) in implementing AI optimization in a closed-loop system was shown to be an important criterion for success. Implementation of AI technology at other Ontario Hydro fossil generating units as part of the overall NOx emission reduction system is envisaged to coincide with the retrofit of the original plant control system with the latest DCS systems. 14 refs., 3 figs.

  18. HydroPak: concept design and analysis of a packaged cross-flow turbine

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2004-07-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed.

  19. HydroPak: concept design and analysis of a packaged cross-flow turbine

    International Nuclear Information System (INIS)

    2004-01-01

    This report summarises the findings of a project to complete the conceptual design and economic optimization of a modular standardised crossflow hydro-turbine. Details are given of the work to date, the comparison of HydroPak cost with conventional micro- and mini-hydro power costs, and the economic advantages of taking the ''packaged'' and ''standardised approaches'' to the design process. The market for mini-hydro turbines is discussed

  20. Pricing Energy and Ancillary Services in a Day-Ahead Market for a Price-Taker Hydro Generating Company Using a Risk-Constrained Approach

    Directory of Open Access Journals (Sweden)

    Perica Ilak

    2014-04-01

    Full Text Available This paper analyzes a price-taker hydro generating company which participates simultaneously in day-ahead energy and ancillary services markets. An approach for deriving marginal cost curves for energy and ancillary services is proposed, taking into consideration price uncertainty and opportunity cost of water, which can later be used to determine hourly bid curves. The proposed approach combines an hourly conditional value-at-risk, probability of occurrence of automatic generation control states and an opportunity cost of water to determine energy and ancillary services marginal cost curves. The proposed approach is in a linear constraint form and is easy to implement in optimization problems. A stochastic model of the hydro-economic river basin is presented, based on the actual Vinodol hydropower system in Croatia, with a complex three-dimensional relationship between the power produced, the discharged water, and the head of associated reservoir.

  1. 75 FR 65312 - Vortex Hydro Energy, LLC; Notice of Competing Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2010-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13831-000] Vortex Hydro... Comments and Interventions October 15, 2010. On August 9, 2010, Vortex Hydro Energy, LLC filed an... 0.788 gigawatt-hours. Applicant Contact: Gus Simiao, CEO, Vortex Hydro Energy, LLC, 2512 Carpenter...

  2. 76 FR 76155 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2011-12-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... Diego Gas & Electric Company transmission line located to the south. Applicant Contact: Arnold B...

  3. 77 FR 21765 - Nevada Hydro Company, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2012-04-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. P-14227-000] Nevada Hydro..., Motions To Intervene, and Competing Applications On July 14, 2011, the Nevada Hydro Company (Nevada Hydro... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...

  4. Graphical constraints: a graphical user interface for constraint problems

    OpenAIRE

    Vieira, Nelson Manuel Marques

    2015-01-01

    A constraint satisfaction problem is a classical artificial intelligence paradigm characterized by a set of variables (each variable with an associated domain of possible values), and a set of constraints that specify relations among subsets of these variables. Solutions are assignments of values to all variables that satisfy all the constraints. Many real world problems may be modelled by means of constraints. The range of problems that can use this representation is very diverse and embrace...

  5. Distance Constraint Satisfaction Problems

    Science.gov (United States)

    Bodirsky, Manuel; Dalmau, Victor; Martin, Barnaby; Pinsker, Michael

    We study the complexity of constraint satisfaction problems for templates Γ that are first-order definable in ({ Z}; {suc}), the integers with the successor relation. Assuming a widely believed conjecture from finite domain constraint satisfaction (we require the tractability conjecture by Bulatov, Jeavons and Krokhin in the special case of transitive finite templates), we provide a full classification for the case that Γ is locally finite (i.e., the Gaifman graph of Γ has finite degree). We show that one of the following is true: The structure Γ is homomorphically equivalent to a structure with a certain majority polymorphism (which we call modular median) and CSP(Γ) can be solved in polynomial time, or Γ is homomorphically equivalent to a finite transitive structure, or CSP(Γ) is NP-complete.

  6. Pair Production Constraints on Superluminal Neutrinos Revisited

    International Nuclear Information System (INIS)

    Brodsky, Stanley

    2012-01-01

    We revisit the pair creation constraint on superluminal neutrinos considered by Cohen and Glashow in order to clarify which types of superluminal models are constrained. We show that a model in which the superluminal neutrino is effectively light-like can evade the Cohen-Glashow constraint. In summary, any model for which the CG pair production process operates is excluded because such timelike neutrinos would not be detected by OPERA or other experiments. However, a superluminal neutrino which is effectively lightlike with fixed p 2 can evade the Cohen-Glashow constraint because of energy-momentum conservation. The coincidence involved in explaining the SN1987A constraint certainly makes such a picture improbable - but it is still intrinsically possible. The lightlike model is appealing in that it does not violate Lorentz symmetry in particle interactions, although one would expect Hughes-Drever tests to turn up a violation eventually. Other evasions of the CG constraints are also possible; perhaps, e.g., the neutrino takes a 'short cut' through extra dimensions or suffers anomalous acceleration in matter. Irrespective of the OPERA result, Lorentz-violating interactions remain possible, and ongoing experimental investigation of such possibilities should continue.

  7. Diffusion Processes Satisfying a Conservation Law Constraint

    Directory of Open Access Journals (Sweden)

    J. Bakosi

    2014-01-01

    Full Text Available We investigate coupled stochastic differential equations governing N nonnegative continuous random variables that satisfy a conservation principle. In various fields a conservation law requires a set of fluctuating variables to be nonnegative and (if appropriately normalized sum to one. As a result, any stochastic differential equation model to be realizable must not produce events outside of the allowed sample space. We develop a set of constraints on the drift and diffusion terms of such stochastic models to ensure that both the nonnegativity and the unit-sum conservation law constraints are satisfied as the variables evolve in time. We investigate the consequences of the developed constraints on the Fokker-Planck equation, the associated system of stochastic differential equations, and the evolution equations of the first four moments of the probability density function. We show that random variables, satisfying a conservation law constraint, represented by stochastic diffusion processes, must have diffusion terms that are coupled and nonlinear. The set of constraints developed enables the development of statistical representations of fluctuating variables satisfying a conservation law. We exemplify the results with the bivariate beta process and the multivariate Wright-Fisher, Dirichlet, and Lochner’s generalized Dirichlet processes.

  8. Constraint-based scheduling

    Science.gov (United States)

    Zweben, Monte

    1993-01-01

    The GERRY scheduling system developed by NASA Ames with assistance from the Lockheed Space Operations Company, and the Lockheed Artificial Intelligence Center, uses a method called constraint-based iterative repair. Using this technique, one encodes both hard rules and preference criteria into data structures called constraints. GERRY repeatedly attempts to improve schedules by seeking repairs for violated constraints. The system provides a general scheduling framework which is being tested on two NASA applications. The larger of the two is the Space Shuttle Ground Processing problem which entails the scheduling of all the inspection, repair, and maintenance tasks required to prepare the orbiter for flight. The other application involves power allocation for the NASA Ames wind tunnels. Here the system will be used to schedule wind tunnel tests with the goal of minimizing power costs. In this paper, we describe the GERRY system and its application to the Space Shuttle problem. We also speculate as to how the system would be used for manufacturing, transportation, and military problems.

  9. Hydro-MRI for abdominal diagnostics in children; Hydro-MRT in der Darmdiagnostik bei Kindern

    Energy Technology Data Exchange (ETDEWEB)

    Kern, A.; Schunk, K.; Oberholzer, K.; Thelen, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Radiologie; Kessler, M. [Mainz Univ. (Germany). Klinik und Poliklinik fuer Kinderchirurgie

    2001-11-01

    A clinical evaluation of hydro-MRI as an alternative method to barium studies in children with abdominal pain of unknown origin is presented. Patients and Methods: 20 children with abdominal pain of unknown origin aged from 9 - 16 years were examined after oral bowel opacification using 1000 ml of 2.5% mannitol solution with a 1.0T MRI system. The investigation was done in 2 planes (coronal and axial) under breath-hold conditions. Imaging procedures included various sequences (T2W HASTE + FS, contrast-enhanced T1W FLASH FS). Suspicious findings in bowel segments and extra-intestinal changes were assessed. Results: In 21/24 examinations the small bowel was completely visualized, in 15/24 cases colon segments were identified. An accurate assessment of the terminal ileum was not possible in 3/24 procedures. Breathing artefacts occurred in 3/24 examinations. Signs of Crohn's disease were found in 4 examinations, inflammatory changes of the ileum were detected in 3 cases. Inflammation of the colon was demonstrated in 2 children. Furthermore, pathological findings included constipation in one child and inflammation of the ileo-colic and mesenterial lymph nodes were found in another child. Extra-intestinal changes in 3 children were caused by ovarian cysts, and in one case by pleural effusion. In 4 examinations we detected ascites in the absence of other pathological findings. In 5 children there was no pathological correlation in the bowel or extra-intestinal region for the complaints. The children tolerated the hydro-MRI very well. There were no side effects using oral mannitol. (orig.) [German] Ziel: Klinische Evaluation der Hydro-MRT bei Kindern mit unklarer abdomineller Symptomatik als alternative Methode zur fraktionierten Magen-Darm-Passage. Patienten und Methoden: 20 Kinder und Jugendliche im Alter von 9 bis 16 Jahren mit unklaren abdominellen Beschwerden bzw. mit Verdacht auf eine chronisch entzuendliche Darmerkrankung wurden nach einer oralen

  10. A tale of three hydros - post-privatisation in Patagonia

    International Nuclear Information System (INIS)

    Smith, H.F.

    1994-01-01

    When Argentina's state-owned utility, operating in northern Patagonia, sold off hydro-electric generating plants in 1993, they were bought by several North American utility companies. This article looks at the problems these companies encountered and examines whether the enterprise has shown itself to be economically valuable. (UK)

  11. Environmental-impact assessment of hydro-power in Egypt

    International Nuclear Information System (INIS)

    Rashad, S.M.; Ismail, M.A.

    2000-01-01

    The environmental impact of energy production and use with the associated emissions of greenhouse gases, particularly CO 2 , has created much attention and growing concern at both national and international levels. In Egypt, efforts have been directed to incorporate the environment-protection issues within the overall planning of the energy sector, as appropriate to its national commitment and its techno-economic considerations. Over the past decade, 1985-1995, hydro-power had contributed between 28 and 22% of the total energy produced by Egyptian power-plants, while the contribution of the hydro capacity was between 32.4 and 21.5%. Many studies have been carried out on the impacts of the Aswan High Dam on various aspects of the environment. An objective evaluation of the Dam, based on 25 years of operational data, indicated that it has overall been positive even though it has contributed to some environmental problems. These problems, however, are significantly less than most people originally expected. This paper deals with the review and analysis of the detrimental effects of hydro-power in Egypt. An evaluation will be given of the emissions of greenhouse gases from the whole hydro-chain. (Author)

  12. BC Hydro's transmission business : transition to a competitive marketplace

    International Nuclear Information System (INIS)

    Threlkeld, R.J.

    1998-01-01

    Progress made by BC Hydro to facilitate the use of the transmission system for wholesale electricity transactions, including the separation of the system operation function from generation and merchant functions, was discussed. BC Hydro, Canada's third largest electric utility, was the first Canadian utility to offer open access to its transmission system for wholesale transactions. The utility has an installed generating capacity of about 10.8 gigawatts, 90 per cent of which is hydroelectric. The remainder is thermal, gas turbine and stationary and mobile diesel generation. The key element in establishing wholesale transmission transactions was the FERC-mandated open access same-time information system (OASIS) on which BC Hydro posts available transmission capacity, planned outages and pricing. The system operates on BC Hydro's internet node and interfaces to a Transmission Scheduling System (TSS). The TSS was developed in-house to handle the increased complexity of scheduling multiple energy and capacity transactions for users of the transmission system. Operation of the system and the challenge to constantly improve it were discussed

  13. Asymptotic study of a magneto-hydro-dynamic system

    International Nuclear Information System (INIS)

    Benameur, J.; Ibrahim, S.; Majdoub, M.

    2003-01-01

    In this paper, we study the convergence of solutions of a Magneto-Hydro-Dynamic system. On the torus T 3 , the proof is based on Schochet's methods, whereas in the case of the whole space R 3 , we use Strichartz's type estimates. (author)

  14. Experimental condition in the preparation of catalysts for Hydro treatment

    International Nuclear Information System (INIS)

    Gomez P, Alvaro

    1998-01-01

    In this work, by means of an exhaustive bibliographical revision and in a methodical way, they seek to settle down, the characteristics of the catalysts for Hydro treatment (HDT) on those that it is necessary to act with the purpose of obtaining more active, selective and resistant catalysts to the deactivation

  15. The Statoil/Hydro fusion in a continental shelf perspective

    International Nuclear Information System (INIS)

    Osmundsen, Petter

    2007-01-01

    The article analysis the consequences of the Statoil/Hydro merger on the development on the Norwegian continental shelf. Various indicators of results of the market power the merger are presented and the effects of reduced competition on the markets are discussed. The advantages of the merger on the activities on the shelf are analyzed. (tk)

  16. Fuzzy interpolation of hydro power sales data in Simulink

    DEFF Research Database (Denmark)

    Jantzen, Jan; Eliasson, B.

    1994-01-01

    The problem in this case study can be described as a multi-dimensional surface fit to a given set of data. The data are sales figures in MWH/H for a hydro-thermal power generation system. The data are incomplete and not totally reliable. A model with ten fuzzy rules fits the data with a total error...

  17. Hydrological Modeling in Alaska with WRF-Hydro

    Science.gov (United States)

    Elmer, N. J.; Zavodsky, B.; Molthan, A.

    2017-12-01

    The operational National Water Model (NWM), implemented in August 2016, is an instantiation of the Weather Research and Forecasting hydrological extension package (WRF-Hydro). Currently, the NWM only covers the contiguous United States, but will be expanded to include an Alaska domain in the future. It is well known that Alaska presents several hydrological modeling challenges, including unique arctic/sub-arctic hydrological processes not observed elsewhere in the United States and a severe lack of in-situ observations for model initialization. This project sets up an experimental version of WRF-Hydro in Alaska mimicking the NWM to gauge the ability of WRF-Hydro to represent hydrological processes in Alaska and identify model calibration challenges. Recent and upcoming launches of hydrology-focused NASA satellite missions such as the Soil Moisture Active Passive (SMAP) and Surface Water Ocean Topography (SWOT) expand the spatial and temporal coverage of observations in Alaska, so this study also lays the groundwork for assimilating these NASA datasets into WRF-Hydro in the future.

  18. Hydro-Quebec International : taking up the challenges of globalization

    International Nuclear Information System (INIS)

    Carpentier, J.M.

    1997-01-01

    With the ever increasing demand for electricity, it is estimated that the world''s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today''s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec''s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market

  19. The radiation safety self-assessment program of Ontario Hydro

    International Nuclear Information System (INIS)

    Armitage, G.; Chase, W.J.

    1987-01-01

    Ontario Hydro has developed a self-assessment program to ensure that high quality in its radiation safety program is maintained. The self-assessment program has three major components: routine ongoing assessment, accident/incident investigation, and detailed assessments of particular radiation safety subsystems or of the total radiation safety program. The operation of each of these components is described

  20. Hydro-Quebec International : taking up the challenges of globalization

    Energy Technology Data Exchange (ETDEWEB)

    Carpentier, J.M.

    1997-12-31

    With the ever increasing demand for electricity, it is estimated that the world`s electrical generating capacity will grow by about 1,000,000 MW over the next eight years. This represents a 40 per cent increase over today`s capacity. Hydro-Quebec is determined to stake its place in international markets and to maximize the profits from the strong expertise gained during the construction of Quebec`s major electric facilities. The venture into international markets is primarily a commercial strategy. To that effect, Hydro-Quebec plans to invest up to $300 million in international projects around the world so that after five years it can have major interests and assets totaling $12 billion or more. China, North Africa and the Middle East are some of the market that Hydro-Quebec wishes to enter in the years ahead. The Eastern European and Southeast Asian markets are also worthy of interest. It was pointed out that Hydro-Quebec is not the only large electric utility turning to world market to pursue its growth. French, Spanish and American companies are also presently investing billions of dollars in the world market.

  1. Hydro-Quebec's Strategic Plan 2002-2006 : summary

    International Nuclear Information System (INIS)

    2001-01-01

    A corporate profile of Hydro-Quebec was presented and the strategy that the utility will adopt for the 2002-2006 period was summarized. The utility plans to maintain its service quality and sustain environmental quality while developing a world class enterprise. Quebec has adopted a heritage pool giving Quebec consumers access to a maximum of 165 TWh of electricity per year at an average commodity rate of 2.79 cents per kilowatt-hour, the lowest rate for such a large amount of energy in North America. Above that volume, supply for the Quebec market will be ensured through competitive bidding, leading to the signing of supply contracts based on market price. Hydro-Quebec's strategy reflects the business opportunities open to Hydro-Quebec given its traditional activities in the province, the restructuring of North American energy markets, and the emergence of Quebec as a major energy hub. The business opportunities come from the fact that demand for electricity in Quebec is growing and from the opening of markets close to Quebec. Investment outlook in hydroelectric generation and transmission also appears to be profitable. It is likely that investment will be needed to build infrastructure. Hydro-Quebec is also working with its qualified workforce to develop a world-class international activity base. tabs., figs

  2. Hydro-carbon liquid for use in motors

    Energy Technology Data Exchange (ETDEWEB)

    Cobbett, G T.B.

    1907-03-15

    A process for the manufacture of liquid hydro-carbon mixtures suitable as a fuel for internal-combustion engines is disclosed, which consists in dissolving a suitable quantity of shale oil, which has been purified with sulfuric acid, in petroleum spirit, then purifying the solution with sulfuric acid and subsequently with oxalic acid or other suitable decolorizing agent.

  3. Fifteen years of radioactive waste management at Ontario Hydro

    International Nuclear Information System (INIS)

    Carter, T.J.; Rao, P.K.M.

    1985-01-01

    Ontario Hydro is a large Canadian utility producing 84% (7394 MWe) of the Nuclear Electricity generated in Canada. The low- and intermediate-level radioactive wastes generated by the Ontario Hydro program are currently being managed at the Bruce Nuclear Power Development with various volume reduction, packaging and interim storage systems. Ontario Hydro also owns and operates a radioactive waste transportation system. Studies are in progress for final disposal of these wastes in a suitable geology in Ontario. Since its inception in 1971, Ontario Hydro's radioactive waste management program has evolved into providing a full fledged radioactive waste management capability to the utility's two nuclear generation centres at Pickering and Bruce, and later in the decade, to Darlington. This paper summarizes the various developments in this program; highlights the major facilities both in-service and planned to be built; reviews the experiences gained over fifteen years of in-house waste management; and discusses the proposed reorientation towards ultimate disposal of these wastes. 2 refs., 8 figs., 1 tab

  4. Exploration of hydro-geomorphological indices for coastal floodplain ...

    African Journals Online (AJOL)

    Flood is a reoccurring natural hazard in many parts of Nigeria, and is likely to increase in severity and frequency. Characterization of recently flooded areas was carried out using hydro-morphological indices to identify flood prone areas. In flood risk quantification and identification, hydrodynamic models require vast ...

  5. Comparison between MPC and PID control for compact hydro ...

    African Journals Online (AJOL)

    This paper presents water temperature of a hydro distillation that have been modelled by using linear ARX Modal. Based on the modal obtained, a model predictive controller and PID controller have been developed. Both controller undergone the performance of controller tests that includes set point, set point change and ...

  6. Final Report - Wind and Hydro Energy Feasibility Study - June 2011

    Energy Technology Data Exchange (ETDEWEB)

    Jim Zoellick; Richard Engel; Rubin Garcia; Colin Sheppard

    2011-06-17

    This feasibility examined two of the Yurok Tribe's most promising renewable energy resources, wind and hydro, to provide the Tribe detailed, site specific information that will result in a comprehensive business plan sufficient to implement a favorable renewable energy project.

  7. Economically viable and environment-friendly hydro energy in Estonia

    International Nuclear Information System (INIS)

    Saks, Ants; Velner, Harald

    2001-01-01

    Hydro energy has been in oblivion in Estonia for about 30 years now. During the 1960s, most of Estonia's small hydropower plants were closed down, just as it was done in the whole Soviet Union. As the only larger hydro plant, the 125 MW plant in Narva, was situated on the Russian side of the Narva River, there were only two or three small hydro plants left. Even those were exploited at low capacity and mainly for heating the buildings. It was not until the 1990s that a number of enthusiasts started to re-establish the hydro plants by reconstructing old installations. The pre-feasibility study 'Hydropower in Estonia' proposed by Estonian and Swedish experts, showed that the restoration of the hydropower plants and watermills is economically feasible and technically possible if advanced technology is used. Hydropower as an alternative ('green') energy source should be used in the best technical-economical way. The first pilot plant in Estonia, the 200 kW Kamari plant was constructed in 1998 with compact-propeller units, in co-operation with Waterpumps WP Oy and ABB. Today, ten new plants have been constructed or are under construction. Hydropower plants/watermills should be reconstructed in accordance with the legislative acts on environment protection

  8. Unbalance influence on the rotating assembly dynamics of a hydro

    Science.gov (United States)

    Jurcu, M.; Pădureanu, I.; Campian, C. V.; Haţiegan, C.

    2018-01-01

    The dynamics of the rotating parts of a hydro is characterized by the dynamic interaction between the rotor, the stator and the working fluid in order to operate the hydro. The main factors influencing the dynamics of the rotating parts of a hydro are: rotor unbalance, unbalanced magnetic pull, shaft misalignment and hydraulic flow regime. Rotor unbalanced is one of the most common factors influencing the dynamic stability of the rotating parts of a hydro. The unbalanced is determined by: uneven distribution of rotating masses, displacement of parts in the rotor during rotation, inhomogeneity of rotor component materials, expansion of the rotor due to heating, and rising speed during the transient discharge of the load. The mechanical imbalance of a rotor can lead to important forces, responsible for the vibration of the machine, which ultimately leads to a shorter operating time. Even a low unbalance can lead, in the case of high speed machines, to major unbalance forces that cause significant damage to the equipment. The unbalance forces cause additional vibrations in the bearings as well as in the foundation plate. To avoid these vibrations, it is necessary in the first stage to balance the static rotor in the construction plant and then to a dynamic rotation balancing.

  9. Asymptotic study of a magneto-hydro-dynamic system

    Energy Technology Data Exchange (ETDEWEB)

    Benameur, J [Institut Preparatoire aux Etudes d' Ingenieurs de Monastir (Tunisia); Ibrahim, S [Faculte des Sciences de Bizerte, Departement de Mathematiques, Bizerte (TN); [Abdus Salam International Centre for Theoretical Physics, Trieste (Italy)]. E-mail: slim.ibrahim@fsb.rnu.tn; Majdoub, M [Faculte des Sciences de Tunis, Departement de Mathematiques, Tunis (Tunisia)

    2003-01-01

    In this paper, we study the convergence of solutions of a Magneto-Hydro-Dynamic system. On the torus T{sup 3}, the proof is based on Schochet's methods, whereas in the case of the whole space R{sup 3}, we use Strichartz's type estimates. (author)

  10. Statistical variability of hydro-meteorological variables as indicators ...

    African Journals Online (AJOL)

    Statistical variability of hydro-meteorological variables as indicators of climate change in north-east Sokoto-Rima basin, Nigeria. ... water resources development including water supply project, agriculture and tourism in the study area. Key word: Climate change, Climatic variability, Actual evapotranspiration, Global warming ...

  11. Report of the special prosecutor: BC Hydro 'Raiwind' project

    International Nuclear Information System (INIS)

    Fraser, P. D. K.

    1999-10-01

    A special prosecutor has been appointed by the British Columbia Government to assist the Royal Canadian Mounted Police (RCMP) in its investigation, and to render appropriate charging decisions in the matter of the circumstances surrounding the creation of IPC International Power Corporation (IPC) owned by a Mr. John N. Laxton, former Chairman of BC Hydro and his two children, and its joint venture with BC Hydro for the development of an international power project in Pakistan known as the Raiwind project. Of particular concerns were the conflict of interest breached by Mr. Laxton in loaning a substantial sum of money to a principal member of the Pakistani side of the joint venture, and by the former President and CEO of BC Hydro, Mr. John Sheehan, by his purchase of shares of IPC by a company owned by members of his family. In 1996 Mr. Sheehan's employment as President and CEO was terminated by BC Hydro for breaching internal conflict of interest guidelines and for failing to get approval from BC Hydro for the acquisition of IPC shares. Subsequently, Mr. Sheehan commenced an action against BC Hydro for wrongful dismissal, a claim which was upheld by the Supreme Court of British Columbia. The focus of the special prosecutor's criminal investigation ultimately became the conduct of Mr. Laxton and whether a charge could or should be laid under Section 122 of the Criminal Code. The outcome of his investigation, which is discussed in this report, was that there was no substantial likelihood of conviction under the breach or trust provisions of Section 122 with respect to the indirect purchases by Mr. Laxton of shares in IPC. Nor was there any reason to believe that a personal loan made in high-risk circumstances could be a benefit or advantage to the lender. Furthermore, the loan cannot be causally related to any loss or financial harm to BC Hydro. In fact, it could be argued that Mr. Laxton's private decision to make the loan was of real assistance in ensuring that the

  12. Continuous auditing & continuous monitoring : Continuous value?

    NARCIS (Netherlands)

    van Hillo, Rutger; Weigand, Hans; Espana, S; Ralyte, J; Souveyet, C

    2016-01-01

    Advancements in information technology, new laws and regulations and rapidly changing business conditions have led to a need for more timely and ongoing assurance with effectively working controls. Continuous Auditing (CA) and Continuous Monitoring (CM) technologies have made this possible by

  13. Ontario Hydro experience in the identification and mitigation of potential failures in safety critical software systems

    International Nuclear Information System (INIS)

    Huget, R.G.; Viola, M.; Froebel, P.A.

    1995-01-01

    Ontario Hydro has had experience in designing and qualifying safety critical software used in the reactor shutdown systems of its nuclear generating stations. During software design, an analysis of system level hazards and potential hardware failure effects provide input to determining what safeguards will be needed. One form of safeguard, called software self checks, continually monitor the health of the computer on line. The design of self checks usually is a trade off between the amount of computing resources required, the software complexity, and the level of safeguarding provided. As part of the software verification activity, a software hazards analysis is performed, which identifiers any failure modes that could lead to the software causing an unsafe state, and which recommends changes to mitigate that potential. These recommendations may involve a re-structuring of the software to be more resistant to failure, or the introduction of other safeguarding measures. This paper discusses how Ontario Hydro has implemented these aspects of software design and verification into safety critical software used in reactor shutdown systems

  14. Chronic effects of strength training vs. Hydro aerobics on functional and cardiorespiratory ability in postmenopausal women.

    Science.gov (United States)

    Novaes, Giovanni S; Novaes, Jefferson S; Vilaça-Alves, José; Silva, Gabriel Costa E; Garrido, Nuno D; Furtado, Hélio; Reis, Victor M

    2014-09-29

    The current study aimed to compare the effects of two exercise programs (Strength Training and Hydro Gymnastics) on the functional and cardiorespiratory abilities of Portuguese postmenopausal women. The study population consisted of 38 volunteers (age: 66.9 ± 6.1 years, body mass: 73.70 ± 10.38 kg, and body height: 1.55 ± 0.10 m). Subjects were randomly divided into two experimental groups and one control group: one group performed 24 weeks of strength training (GST; n = 14), another performed 24 weeks of hydro gymnastics (GH; n = 17) and a control group (CG; n = 7), where the subjects continued with their regular daily activities without involvement in any physical exercise program. Three assessments were performed: before the beginning of the program, 12 weeks after the start of the training program and 24 weeks after the start of the program. To assess the functional ability of the participants, several tests proposed by Jones and Rikli (2002) were performed. To evaluate the cardiorespiratory ability of the participants, a modified treadmill Bruce test was applied. Significant differences (ptraining methods in the tests, which primarily demanded muscular strength. Body mass and the body mass index showed significant differences during the three stages of assessment in the GST group (pfunctional and cardiorespiratory abilities of Portuguese postmenopausal women.

  15. Marginal-cost pricing for Hydro-Quebec residential customers

    International Nuclear Information System (INIS)

    Paquin, C.

    1994-02-01

    An option available to governments and to utilities such as Hydro-Quebec for responding to objectives of energy efficiency is the adoption of marginal cost pricing. Compared to currently used price structures, marginal cost pricing will allow improvement of price signals and assure an optimal utilization of the resource. That type of pricing could be economically beneficial but may not be desirable from the point of view of revenue distribution. Taking account of Hydro-Quebec's cost structure, pure marginal cost pricing would generate an income that would be strongly contested on equity grounds. For example, it would raise prices 60% for residential customers. Faced with this possibility, an analysis is presented of the impact of a peak-offpeak pricing (or pure marginal cost pricing) on Hydro-Quebec's residential customer energy bills. The marginal costs of Hydro-Quebec are calculated by the method of Bernard and Chatel (1985) and analysis of the results is based on Friedman and Weare (1993). A sample of 28,417 residential customers from a 1989 Hydro-Quebec survey is used in the study. Two scenarios are analyzed; the first allowing comparison of the energy bill only on the basis of marginal costs and of average costs, and the second allowing comparison of the impact of marginal cost pricing on the total bill. In the first scenario, the impact translates into a 31% increase in energy bills for the entire customer class considered; in addition, this impact is inversely proportional to the revenue class. In the second scenario, the increase is 24%. 33 refs., 10 figs., 53 tabs

  16. Hydro-Quebec : annual report 1998 : for today and tomorrow

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. In 1998, the utility had over 31,400 MW in installed capacity, ranking it among North America's largest distributors of electrical energy. This report provides a review of progress and financial highlights including revenue, expenditure, financial expenses, net income, total assets, long term debt, shareholder's equity and the overall financial position of the utility. In 1998 sales totaled 161.4 TWh, with Quebec markets accounting for more than 88 percent and sales, outside Quebec accounting for 11.5 per cent. Three factors related to weather impacted the utility in 1998. The first was mild weather which brought down domestic and agricultural power consumption by 3 TWh compared with the average recorded in the past half-century. The second was low precipitation which caused Hydro-Quebec to turn to means other than hydroelectric generation to supply power to Quebec customers. These included start-up generation of the Tracy thermal generating station, reduction of sales on short-term markets outside Quebec, and electricity purchases on external markets. The third factor was the ice storm of January 1998, which caused significant damage to part of Hydro-Quebec's transmission and distribution systems. Throughout the year, Hydro-Quebec worked in reinforcing its power lines to prevent repetition of the devastation that occurred during the ice storm. In spite of the events of January 1998, the Utility remains committed to the growth and profitability orientations laid out in its Strategic Plan for 1998-2002. Significant progress was made in consolidating the Utility's position in international markets. Productive partnerships have been established with the Quebec Federation of Labour Solidarity Fund, and with Gaz de France. A network of international partners in a score of countries also has been developed. Hydro-Quebec has completed most of its preparations for Year 2000 readiness

  17. Efficient Searching with Linear Constraints

    DEFF Research Database (Denmark)

    Agarwal, Pankaj K.; Arge, Lars Allan; Erickson, Jeff

    2000-01-01

    We show how to preprocess a set S of points in d into an external memory data structure that efficiently supports linear-constraint queries. Each query is in the form of a linear constraint xd a0+∑d−1i=1 aixi; the data structure must report all the points of S that satisfy the constraint. This pr...

  18. Deepening Contractions and Collateral Constraints

    DEFF Research Database (Denmark)

    Jensen, Henrik; Ravn, Søren Hove; Santoro, Emiliano

    and occasionally non-binding credit constraints. Easier credit access increases the likelihood that constraints become slack in the face of expansionary shocks, while contractionary shocks are further amplified due to tighter constraints. As a result, busts gradually become deeper than booms. Based...

  19. Wind, hydro or mixed renewable energy source

    DEFF Research Database (Denmark)

    Yang, Yingkui; Solgaard, Hans Stubbe; Haider, Wolfgang

    2016-01-01

    While the share of renewable energy, especially wind power, increases in the energy mix, the risk of temporary energy shortage increases as well. Thus, it is important to understand consumers' preference for the renewable energy towards the continuous growing renewable energy society. We use...

  20. A satellite-driven, client-server hydro-economic model prototype for agricultural water management

    Science.gov (United States)

    Maneta, Marco; Kimball, John; He, Mingzhu; Payton Gardner, W.

    2017-04-01

    Anticipating agricultural water demand, land reallocation, and impact on farm revenues associated with different policy or climate constraints is a challenge for water managers and for policy makers. While current integrated decision support systems based on programming methods provide estimates of farmer reaction to external constraints, they have important shortcomings such as the high cost of data collection surveys necessary to calibrate the model, biases associated with inadequate farm sampling, infrequent model updates and recalibration, model overfitting, or their deterministic nature, among other problems. In addition, the administration of water supplies and the generation of policies that promote sustainable agricultural regions depend on more than one bureau or office. Unfortunately, managers from local and regional agencies often use different datasets of variable quality, which complicates coordinated action. To overcome these limitations, we present a client-server, integrated hydro-economic modeling and observation framework driven by satellite remote sensing and other ancillary information from regional monitoring networks. The core of the framework is a stochastic data assimilation system that sequentially ingests remote sensing observations and corrects the parameters of the hydro-economic model at unprecedented spatial and temporal resolutions. An economic model of agricultural production, based on mathematical programming, requires information on crop type and extent, crop yield, crop transpiration and irrigation technology. A regional hydro-climatologic model provides biophysical constraints to an economic model of agricultural production with a level of detail that permits the study of the spatial impact of large- and small-scale water use decisions. Crop type and extent is obtained from the Cropland Data Layer (CDL), which is multi-sensor operational classification of crops maintained by the United States Department of Agriculture. Because

  1. Integrated geophysical investigations for the delineation of source and subsurface structure associated with hydro-uranium anomaly: A case study from South Purulia Shear Zone (SPSZ), India

    Science.gov (United States)

    Sharma, S. P.; Biswas, A.

    2012-12-01

    South Purulia Shear Zone (SPSZ) is an important region for prospecting of uranium mineralization. Geological studies and hydro-uranium anomaly suggest the presence of Uranium deposit around Raghunathpur village which lies about 8 km north of SPSZ. However, detailed geophysical investigations have not been carried out in this region for investigation of uranium mineralization. Since surface signature of uranium mineralization is not depicted near the location, a deeper subsurface source is expected for hydro uranium anomaly. To delineate the subsurface structure and to investigate the origin of hydro-uranium anomaly present in the area, Vertical Electrical Sounding (VES) using Schlumberger array and Gradient Resistivity Profiling (GRP) were performed at different locations along a profile perpendicular to the South Purulia Shear Zone. Apparent resistivity computed from the measured sounding data at various locations shows a continuously increasing trend. As a result, conventional apparent resistivity data is not able to detect the possible source of hydro uranium anomaly. An innovative approach is applied which depicts the apparent conductivity in the subsurface revealed a possible connection from SPSZ to Raghunathpur. On the other hand resistivity profiling data suggests a low resistive zone which is also characterized by low Self-Potential (SP) anomaly zone. Since SPSZ is characterized by the source of uranium mineralization; hydro-uranium anomaly at Raghunathpur is connected with the SPSZ. The conducting zone has been delineated from SPSZ to Raghunathpur at deeper depths which could be uranium bearing. Since the location is also characterized by a low gravity and high magnetic anomaly zone, this conducting zone is likely to be mineralized zone. Keywords: Apparent resistivity; apparent conductivity; Self Potential; Uranium mineralization; shear zone; hydro-uranium anomaly.

  2. A hydro-optical model for deriving water quality variables from satellite images (HydroSat): A case study of the Nile River demonstrating the future Sentinel-2 capabilities

    NARCIS (Netherlands)

    Salama, M.; Radwan, M.; van der Velde, R.

    2012-01-01

    This paper describes a hydro-optical model for deriving water quality variables from satellite images, hereafter HydroSat. HydroSat corrects images for atmospheric interferences and simultaneously retrieves water quality variables. An application of HydroSat to Landsat Enhanced Thematic Mapper (ETM)

  3. Reduction Of Constraints For Coupled Operations

    International Nuclear Information System (INIS)

    Raszewski, F.; Edwards, T.

    2009-01-01

    the High Level Waste (HLW) System Plan. As with the first phase of testing for sludge-only operations, replacement of the homogeneity constraint with the alumina and sum of alkali constraints will ensure acceptable product durability over the compositional region evaluated. Although these study glasses only provide limited data in a large compositional region, the approach and results are consistent with previous studies that challenged the homogeneity constraint for sludge-only operations. That is, minimal benefit is gained by imposing the homogeneity constraint if the other PCCS constraints are satisfied. The normalized boron releases of all of the glasses are well below the Environmental Assessment (EA) glass results, regardless of thermal history. Although one of the glasses had a normalized boron release of approximately 10 g/L and was not predictable, the glass is still considered acceptable. This particular glass has a low Al 2 O 3 concentration, which may have attributed to the anomalous behavior. Given that poor durability has been previously observed in other glasses with low Al 2 O 3 and Fe 2 O 3 concentrations, including the sludge-only reduction of constraints study, further investigations appear to be warranted. Based on the results of this study, it is recommended that the homogeneity constraint (in its entirety with the associated low frit/high frit constraints) be eliminated for coupled operations as defined by Revision 14 of the HLW System Plan with up to 2 wt% TiO 2 . The use of the alumina and sum of alkali constraints should be continued along with the variability study to determine the predictability of the current durability models and/or that the glasses are acceptable with respect to durability. The use of a variability study for each batch is consistent with the glass product control program and it will help to assess new streams or compositional changes. It is also recommended that the influence of alumina and alkali on durability be studied

  4. The political economy of Canadian hydro-electricity : between old provincial hydros and neoliberal regional energy regimes

    International Nuclear Information System (INIS)

    Netherton, A.

    2007-01-01

    In economic terms, hydro-electricity is considered as a quasi-staple, as it prone to the classic staples problem of excess capacity. However, neither water nor hydroelectricity in Canada is produced primarily for export markets. Hydroelectric systems are often thought of as politicized monopolies. This paper discussed changes that have occurred in hydroelectric organizations over time, as they have been governed by a formative mixed regime; postwar provincial hydro systems; a megaprojects regime; and an emerging sustainability regionalization regime. The origins of electricity generation and transmission in Canada were discussed, as well as the ecological footprint of large mega-projects on rivers. The development of provincial hydro monopolies during the mid- to late- twentieth century was also outlined, as well as the sustainability and regionalization regime that developed after 1990. During the mature staples period of the mid-century, rents in hydro-electric organizations were distributed through cheap rates to subsidize and facilitate the development of mass production and mass consumption. However, post-staples consumption has now replaced mass consumption, and demand side management is replacing earlier cheap power policies. Nonetheless, the lack of systematic integration of networks has led to inefficiencies. Provincial grids are now being integrated into interconnected North American regional networks regulated by the United States. It was concluded that the Canadian electricity regime is increasingly influenced by the the supranational role that the United States is playing in structuring markets. 83 refs

  5. Development of a finite element code to solve thermo-hydro-mechanical coupling and simulate induced seismicity.

    Science.gov (United States)

    María Gómez Castro, Berta; De Simone, Silvia; Rossi, Riccardo; Larese De Tetto, Antonia; Carrera Ramírez, Jesús

    2015-04-01

    Coupled thermo-hydro-mechanical modeling is essential for CO2 storage because of (1) large amounts of CO2 will be injected, which will cause large pressure buildups and might compromise the mechanical stability of the caprock seal, (2) the most efficient technique to inject CO2 is the cold injection, which induces thermal stress changes in the reservoir and seal. These stress variations can cause mechanical failure in the caprock and can also trigger induced earthquakes. To properly assess these effects, numerical models that take into account the short and long-term thermo-hydro-mechanical coupling are an important tool. For this purpose, there is a growing need of codes that couple these processes efficiently and accurately. This work involves the development of an open-source, finite element code written in C ++ for correctly modeling the effects of thermo-hydro-mechanical coupling in the field of CO2 storage and in others fields related to these processes (geothermal energy systems, fracking, nuclear waste disposal, etc.), and capable to simulate induced seismicity. In order to be able to simulate earthquakes, a new lower dimensional interface element will be implemented in the code to represent preexisting fractures, where pressure continuity will be imposed across the fractures.

  6. A good advertisement for hydro power

    International Nuclear Information System (INIS)

    Wood, J.

    1999-01-01

    The generation of hydroelectric power in Iceland continues to be a thriving business. Between 1996 and 2000, Landsvirkjun will increase its supply to customers by 50%: the additional power will be used by the expanding energy-intensive heavy industries. Although prices for construction and operation of industrial plant in Iceland are not always the lowest, the quality is said to be exceptionally high and this attracts outside investors. Iceland continues to uprate old generating plant and build new. Through Landsvirkjun all of Iceland's electricity comes from renewable sources: diesel and gas appear to have little future in Iceland. Nevertheless, Landsvirkjun does not have a total monopoly: permits for new developments are issued to suitable applicants and competition is likely to increase. (UK)

  7. Design with Nonlinear Constraints

    KAUST Repository

    Tang, Chengcheng

    2015-12-10

    Most modern industrial and architectural designs need to satisfy the requirements of their targeted performance and respect the limitations of available fabrication technologies. At the same time, they should reflect the artistic considerations and personal taste of the designers, which cannot be simply formulated as optimization goals with single best solutions. This thesis aims at a general, flexible yet e cient computational framework for interactive creation, exploration and discovery of serviceable, constructible, and stylish designs. By formulating nonlinear engineering considerations as linear or quadratic expressions by introducing auxiliary variables, the constrained space could be e ciently accessed by the proposed algorithm Guided Projection, with the guidance of aesthetic formulations. The approach is introduced through applications in different scenarios, its effectiveness is demonstrated by examples that were difficult or even impossible to be computationally designed before. The first application is the design of meshes under both geometric and static constraints, including self-supporting polyhedral meshes that are not height fields. Then, with a formulation bridging mesh based and spline based representations, the application is extended to developable surfaces including origami with curved creases. Finally, general approaches to extend hard constraints and soft energies are discussed, followed by a concluding remark outlooking possible future studies.

  8. Searching for genomic constraints

    Energy Technology Data Exchange (ETDEWEB)

    Lio` , P [Cambridge, Univ. (United Kingdom). Genetics Dept.; Ruffo, S [Florence, Univ. (Italy). Fac. di Ingegneria. Dipt. di Energetica ` S. Stecco`

    1998-01-01

    The authors have analyzed general properties of very long DNA sequences belonging to simple and complex organisms, by using different correlation methods. They have distinguished those base compositional rules that concern the entire genome which they call `genomic constraints` from the rules that depend on the `external natural selection` acting on single genes, i. e. protein-centered constraints. They show that G + C content, purine / pyrimidine distributions and biological complexity of the organism are the most important factors which determine base compositional rules and genome complexity. Three main facts are here reported: bacteria with high G + C content have more restrictions on base composition than those with low G + C content; at constant G + C content more complex organisms, ranging from prokaryotes to higher eukaryotes (e.g. human) display an increase of repeats 10-20 nucleotides long, which are also partly responsible for long-range correlations; work selection of length 3 to 10 is stronger in human and in bacteria for two distinct reasons. With respect to previous studies, they have also compared the genomic sequence of the archeon Methanococcus jannaschii with those of bacteria and eukaryotes: it shows sometimes an intermediate statistical behaviour.

  9. Searching for genomic constraints

    International Nuclear Information System (INIS)

    Lio', P.; Ruffo, S.

    1998-01-01

    The authors have analyzed general properties of very long DNA sequences belonging to simple and complex organisms, by using different correlation methods. They have distinguished those base compositional rules that concern the entire genome which they call 'genomic constraints' from the rules that depend on the 'external natural selection' acting on single genes, i. e. protein-centered constraints. They show that G + C content, purine / pyrimidine distributions and biological complexity of the organism are the most important factors which determine base compositional rules and genome complexity. Three main facts are here reported: bacteria with high G + C content have more restrictions on base composition than those with low G + C content; at constant G + C content more complex organisms, ranging from prokaryotes to higher eukaryotes (e.g. human) display an increase of repeats 10-20 nucleotides long, which are also partly responsible for long-range correlations; work selection of length 3 to 10 is stronger in human and in bacteria for two distinct reasons. With respect to previous studies, they have also compared the genomic sequence of the archeon Methanococcus jannaschii with those of bacteria and eukaryotes: it shows sometimes an intermediate statistical behaviour

  10. Extraordinary repair in Madunice Hydro Power Plant

    International Nuclear Information System (INIS)

    Vrablik, R.; Zacik, P.

    2007-01-01

    A New Year did not begin very well for Madunice hydroelectric power plant. On 3 January, 2007 during operation, the TG 1 turbine set suffered sudden large impacts and inadmissible vibration of the machine while in the secondary regulation regime. The attending personnel had to shut down the turbine and discover the cause of the failure. The reinstatement of the TG 1 turbine was realised during 15 days in continual regime because TG 1 turbine is back-up power supply for the Bohunice NPP. (author)

  11. Financial profile of Hydro-Quebec : 1998-2001

    International Nuclear Information System (INIS)

    1999-01-01

    Hydro-Quebec is a publicly owned company with a single shareholder, the Quebec government. It is ranked among North America's largest distributors of green energy. This report provides financial highlights including revenue, expenditure, net income, total assets, long term debt, shareholder's equity and the financial position of the utility. Operating statistics are also provided. This includes electricity sold both in and out of Quebec, total installed capacity, peak requirements for winter, total number of customer accounts, and the number of permanent employees. Because of the January ice storm, Hydro-Quebec's major priority in 1998 was to reinforce its transmission and distribution system to meet customer expectations. From February to December 1998, about 3,000 km of line were built, rebuilt or consolidated. By 2001, the utility will have looped several of its high-voltage transmission systems. Plans are also underway to build four new high-voltage lines and an interconnection with Ontario, using advanced technologies. tabs., figs

  12. Comparison of Ontario Hydro's performance with world power reactors - 1981

    International Nuclear Information System (INIS)

    Dumka, B.R.

    1982-04-01

    The performance of Ontario Hydro's CANDU reactors in 1981 is compared with that of 123 world nuclear power reactors rated at 500 MW(e) or greater. The report is based on data extracted from publications, as well as correspondence with a number of utilities. The basis used is the gross capacity factor, which is defined as gross unit generation divided by the perfect gross output for the period of interest. The lowest of the published turbine and generator design ratings is used to determine the perfect gross output, unless the unit has been proven capable of consistently exceeding this value. The first six reactors in the rankings were CANDU reactors operated by Ontario Hydro

  13. The Nothuesli small hydro project; Wasserkraftwerk Nothuesli, Gonzenbaechli - Vorprojekt

    Energy Technology Data Exchange (ETDEWEB)

    Balachandran, S.; Jorde, K.

    2008-07-01

    This report for the Swiss Federal Office of Energy (SFOE) discusses the project for a small 16-kilowatt hydro plant on the Gonzenbaechli stream in eastern Switzerland. The site, which was used even before 1860 for obtaining power from the stream is briefly described, as are the present remains of earlier installations. An old Francis turbine has been retrieved and could possibly be reused. Water-flow figures and fall-heights are noted. Design flows and residual water quantities required by legislation are noted and discussed, as are the geology and topology of the catchment area. The proposals for a new hydro-power plant are described, including the apparatus proposed with a power of 20 kVA. Environmental aspects are also discussed, as are the investment costs and the economic viability of the project. The paper is completed with a comprehensive appendix, including detailed cost estimates.

  14. Hydro to market green power at special prices

    International Nuclear Information System (INIS)

    McArthur, D.; Salaff, S.

    1996-01-01

    A 600 kW grid-connected demonstration wind turbine at Ontario Place will provide green power to Toronto residents early in 1997. The joint venture project partners include publicly owned Ontario Hydro, Toronto Hydro and Natural Resources Canada. The power will be sold at a premium under arrangements yet to be announced. The green power pricing initiative would allow some customers to buy their electricity at a green price. The project could be a self-financing model for future renewable energy development. The Ontario Place turbine project will determine whether Toronto electricity customers want green power or electricity from nuclear and fossil stations, and could determine which type of generation should be built in the future

  15. New avenues in cobalt-60 production at Ontario Hydro

    International Nuclear Information System (INIS)

    Mylvaganam, C.K.; Ronchka, R.A.

    1990-01-01

    Ontario Hydro produces cobalt-60 in the control rods of twelve power reactors. These reactors have a typical flux of 2 x 10 14 neutrons/cm 2 /s, making them efficient producers of cobalt-60. Current annual production is 45 million curies. Since the primary function of these reactors is the production of electricity, their flexibility to meet the needs of commercial cobalt production by the control rod route is limited. Ontario Hydro is therefore developing innovative production techniques, making use of the CANDU reactor's unique ability to be fuelled on-power. These techniques will enable production to better respond to the market's requirements for quantity and specific activity. As it is supplementary to control rod production, annual supply could potentially reach 165 million curies. (author)

  16. Economic impact of Hydro-Quebec's nuclear activities

    International Nuclear Information System (INIS)

    Emard, R.

    1994-01-01

    Gentilly 2 nuclear power plant has benefited the regions of Becancour and Trois Rivieres, with spin-off at the provincial level. Gentilly 2 is Hydro Quebec's only nuclear plant. Its 675 MW provide nearly 3% of Hydro Quebec's production. Over 664 permanent jobs were created, 70% of them highly specialized and multi-skilled. In 1993, out of C$99 spent, 57.3 were for wages, 16.3 for equipment and supplies (including fuel and heavy water), 18 for professional services provided by AECL and others, and the remainder included fees, permits, contract work, and miscellaneous. Gentilly 2 has fostered technological development and inventions which are used at other CANDU stations. 7 ills

  17. An environmental data base for all Hydro-Quebec reservoirs

    International Nuclear Information System (INIS)

    Demers, C.

    1988-01-01

    Hydro-Quebec has created two management positions specifically for reservoirs, namely Reservoir Ecology Advisor and Reservoir Management Advisor. To assist management decisions, a means was required of bringing together all existing environmental information for each reservoir operated by Hydro-Quebec, including storage reservoirs, auxiliary reservoirs and forebays. A relational database using Reflex software was developed on a network of Macintosh computers. The database contains five blocks of information: general information, and physical, physiochemical, biologic and socioeconomic characteristics for each reservoir. Data will be collected on over 100 sites, and the tool will form the basis for developing a medium-range study program on reservoir ecology. The program must take into account the physical, biological and socioeconomic aspects of the environment, as well as the concerns of management personnel operating the reservoirs, the local population, reservoir users, and various government departments. 2 figs

  18. BC Hydro best practices : energy efficiency and integrated planning

    International Nuclear Information System (INIS)

    Henriques, D.

    2004-01-01

    The key elements to success in energy efficiency include integrated energy planning, a review of conservation potential, pursuing a target, risk sharing between all parties, and long term planning when making investments in demand side management (DSM). The barriers to cost effective energy efficiency investment were also outlined along with the scope of the conservation potential review which included 95 per cent of electricity end use applications in all market sectors including residential, commercial, institutional and industrial. BC Hydro's Power Smart program focuses on energy efficiency and load displacement to meet 35 per cent of the utility's forecasted growth by 2012. The sources of savings within each of the market sectors were identified. Key recommendations regarding energy efficiency and conservation were also presented with reference to financial incentives offered by BC Hydro to consumers to encourage a switch to more efficient lighting systems. 10 figs

  19. Long-term continuous administration of a hydro-ethanolic extract of ...

    African Journals Online (AJOL)

    However patients with renal or cardiac problems should use the plant with caution. Funding: Jointly supported by the International Foundation for Science, Stockholm, Sweden, through a grant (# F/5191-1) to Dr. Patrick Amoateng and the Office of Research, Innovation and Development (ORID), University of Ghana, Accra, ...

  20. ENVIRONMENTAL TECHNOLOGY VERIFICATION: JOINT (NSF-EPA) VERIFICATION STATEMENT AND REPORT HYDRO COMPLIANCE MANAGEMENT, INC. HYDRO-KLEEN FILTRATION SYSTEM, 03/07/WQPC-SWP, SEPTEMBER 2003

    Science.gov (United States)

    Verification testing of the Hydro-Kleen(TM) Filtration System, a catch-basin filter designed to reduce hydrocarbon, sediment, and metals contamination from surface water flows, was conducted at NSF International in Ann Arbor, Michigan. A Hydro-Kleen(TM) system was fitted into a ...

  1. Continuous Problem of Function Continuity

    Science.gov (United States)

    Jayakody, Gaya; Zazkis, Rina

    2015-01-01

    We examine different definitions presented in textbooks and other mathematical sources for "continuity of a function at a point" and "continuous function" in the context of introductory level Calculus. We then identify problematic issues related to definitions of continuity and discontinuity: inconsistency and absence of…

  2. A study of hydro-elastic instabilities of a weir

    International Nuclear Information System (INIS)

    Lacroix, C.; Viollet, P.L.

    1987-01-01

    Following low-frequency oscillations which appeared during the initial isothermal tests of Super-Phenix, LNH developed a scale model together with an analytical model approach. The hydro-elastic model allowed to set the phenomena to evidence and quantify the depending parameters influence, while the analytical approach allowed to have a better understanding of the phenomena and of the main parameters dependence [fr

  3. A Statistic Analysis Of Romanian Seaside Hydro Tourism

    OpenAIRE

    Secara Mirela

    2011-01-01

    Tourism represents one of the ways of spending spare time for rest, recreation, treatment and entertainment, and the specific aspect of Constanta County economy is touristic and spa capitalization of Romanian seaside. In order to analyze hydro tourism on Romanian seaside we have used statistic indicators within tourism as well as statistic methods such as chronological series, interdependent statistic series, regression and statistic correlation. The major objective of this research is to rai...

  4. Hydro-environmental factors and phytoplankton of the Atlantic ...

    African Journals Online (AJOL)

    Hydro-environmental factors and phytoplankton of the Atlantic Ocean, off the Light House Beach, Lagos, Nigeria. ... (28.37±1.88), pH (7.85±0.17), conductivity (44738.75±6262.76 μS/cm), total dissolved solids (29236.71±4273.30 mg/L), salinity (27.11±3.91 ‰), alkalinity (126.99±42.81 mg/L) and chloride (15056.

  5. Hydro-geophysical investigations for groundwater at Atan ...

    African Journals Online (AJOL)

    The depth to bedrock varies from 5.5 - 53.1m with resistivity values ranging between 61 -11,292 ohm-m. The hydro-geologic study focused on measurement of depth to water table and actual depth of the hand dug wells while the geological aspect of the work was hinged on a geologic mapping. The results of hydrogeologic ...

  6. Supergravity constraints on monojets

    International Nuclear Information System (INIS)

    Nandi, S.

    1986-01-01

    In the standard model, supplemented by N = 1 minimal supergravity, all the supersymmetric particle masses can be expressed in terms of a few unknown parameters. The resulting mass relations, and the laboratory and the cosmological bounds on these superpartner masses are used to put constraints on the supersymmetric origin of the CERN monojets. The latest MAC data at PEP excludes the scalar quarks, of masses up to 45 GeV, as the origin of these monojets. The cosmological bounds, for a stable photino, excludes the mass range necessary for the light gluino-heavy squark production interpretation. These difficulties can be avoided by going beyond the minimal supergravity theory. Irrespective of the monojets, the importance of the stable γ as the source of the cosmological dark matter is emphasized

  7. Temporal Concurrent Constraint Programming

    DEFF Research Database (Denmark)

    Valencia, Frank Dan

    Concurrent constraint programming (ccp) is a formalism for concurrency in which agents interact with one another by telling (adding) and asking (reading) information in a shared medium. Temporal ccp extends ccp by allowing agents to be constrained by time conditions. This dissertation studies...... temporal ccp by developing a process calculus called ntcc. The ntcc calculus generalizes the tcc model, the latter being a temporal ccp model for deterministic and synchronouss timed reactive systems. The calculus is built upon few basic ideas but it captures several aspects of timed systems. As tcc, ntcc...... structures, robotic devises, multi-agent systems and music applications. The calculus is provided with a denotational semantics that captures the reactive computations of processes in the presence of arbitrary environments. The denotation is proven to be fully-abstract for a substantial fragment...

  8. BC Hydro experiences the power of engineering document management software

    International Nuclear Information System (INIS)

    Wilkins, A.

    2000-01-01

    The recent popularity of electronic document management software (EDMS), specifically designed for engineering CAD/CAM drawings that holds the promise of reducing paper-pushing and freeing up organizational resources for more productive purposes, is discussed. To illustrate how such systems function, a document management system installed at BC Hydro, with over 2,500 users in two main engineering groups is described. The new system - FileNET - replaces several older systems that have been used as stand-alone systems in various divisions of BC Hydro for some time. Instead of integrating the entire file of some 750,000 documents, the new system has complete records of some 70,000 of the most recent CAD drawings and an on-line index to the older file that is used less frequently. Access to the entire storehouse of drawings is said to be fast, efficient and secure. Automated document control procedures during work-in-progress, viewing, redlining capabilities, seamless integration with CAD tools and Web access to drawings from anywhere within the two engineering divisions, are some of the most noteworthy characteristics of the new system. It does not completely replace paper, but it does promise significant streamlining of the paper handling function. It also ensures that BC Hydro's central computer is the prime repository of all documents and drawings, and that this valuable record of environmental. legal, regulatory and other public policy importance is instantly available, without the need to handle paper

  9. Hydro-Thermal Fatigue Resistance Measurements on Polymer Interfaces

    Science.gov (United States)

    Gurumurthy, Charan K.; Kramer, Edward J.; Hui, Chung-Yuen

    1998-03-01

    We have developed a new technique based on a fiber optic displacement sensor for rapid determination of hydro-thermal fatigue crack growth rate per cycle (da/dN) of an epoxy/polyimide interface used in flip chip attach microelectronic assembly. The sample is prepared as a trilayered cantilever beam by capillary flow of the epoxy underfill over a polyimide coated metallic beam. During hydro-thermal cycling the crack growth along the interface (from the free end) changes the displacement of this end of the beam and we measure the free end displacement at the lowest temperature in each hydro-thermal cycle. The change in beam displacement is then converted into crack growth rate (da/dN). da/dN depends on the maximum change in the strain energy release rate of the crack and the phase angle in each cycle. The relation between da/dN and maximum strain energy release rate characterizes the fatigue crack growth resistance of the interface. We have developed and used a simple model anhydride cured and a commercially available PMDA/ODA passivation for this study.

  10. Study of cavitation in hydro turbines. A review

    Energy Technology Data Exchange (ETDEWEB)

    Kumar, Pardeep; Saini, R.P. [Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee 247667 (India)

    2010-01-15

    Reaction turbines basically Francis turbines and propeller/Kaplan turbines are suitable for medium and low head hydropower sites. The management of the small hydropower plants is an important factor, for achieving higher efficiency of hydro turbines with time. Turbines show declined performance after few years of operation, as they get severely damaged due to various reasons. One of the important reasons is erosive wear of the turbines due to cavitation. Reaction turbines, however are more prone to cavitation especially Francis turbines where a zone in the operating range is seriously affected by cavitation and considered as forbidden zone. Cavitation is a phenomenon which manifests itself in the pitting of the metallic surfaces of turbine parts because of the formation of cavities. In the present paper, studies undertaken in this field by several investigators have been discussed extensively. Based on literature survey various aspects related to cavitation in hydro turbines, different causes for the declined performance and efficiency of the hydro turbines and suitable remedial measures suggested by various investigators have been discussed. (author)

  11. Defense plan of Hydro-Quebec for extreme contingencies

    International Nuclear Information System (INIS)

    Trudel, Guilles; Bernard, Serge; Portales, Esteban

    2000-01-01

    In the last years, Hydro-Quebec it undertook an important program to improve the dependability of their net of energy transport. They concentrated the efforts on increasing the capacity of the net resist in the event of carries to an extreme contingency caused in general by multiple incidents or for successive disconnection of the lines of energy transport. To neutralize these contingencies, Hydro-Quebec it adopted a series of special measures that are contained under the general title of Plan of Defense for Extreme Contingencies. The objective of this plan is to detect the incidents that surpass the capacity of the net. It is completely automatic and it is based mainly in: A system of automatic disconnection of generation and tele-shot of loads; A system of automatic maneuver (opening and closing) of inductances shunt of 735 kw; A system of disconnection of loads for low voltage; A system of disconnection of loads for low frequency. The present document summarizes the orientations that there is taking Hydro-Quebec to protect its net in the event of extreme contingencies and it describes the different automatism that they are adopts, in particular the system automatic disconnection of generation and tele-shot of loads (RPTC) that is one of the main components of the defense plan. The system RPTC detects the simultaneous loss of several lines directly in 15 substations of 735 kw. It understands four places of automatic disconnection of generation and a centralized system of tele-shot of loads

  12. In the spotlight: New hydro development in North America

    International Nuclear Information System (INIS)

    Barnes, M.J.

    1993-01-01

    1992 was a year of progress for many segments of the hydropower industry as developers worked to bring new projects on line. This industry overview features several of these projects and offers a preview of 1993 activity. The only operating privately owned hydroelectric project in Texas. The largest hydro plant in the province of Manitoba. The world's largest submersible hydroturbine-generator. These projects and others-completed and placed in service in 1992-can claim a special place in the history books. For each of the 31 hydro projects in North America that began operating in 1992, there's a unique story to tell. Each called upon the time, talent, commitment, ingenuity, and perseverance of those involved in their development. In aggregate, these projects contribute nearly 3,800 MW of clean, renewable electrical capacity that can be used efficiently and cost-effectively to help meet the power demands of customers in the US and Canada. Utilities, state agencies, municipalities, and independent power developers played roles in developing new hydro in 1992. We offer a sampling of their work to illustrate progress made in the past year

  13. Large scale hydro-economic modelling for policy support

    Science.gov (United States)

    de Roo, Ad; Burek, Peter; Bouraoui, Faycal; Reynaud, Arnaud; Udias, Angel; Pistocchi, Alberto; Lanzanova, Denis; Trichakis, Ioannis; Beck, Hylke; Bernhard, Jeroen

    2014-05-01

    To support European Union water policy making and policy monitoring, a hydro-economic modelling environment has been developed to assess optimum combinations of water retention measures, water savings measures, and nutrient reduction measures for continental Europe. This modelling environment consists of linking the agricultural CAPRI model, the LUMP land use model, the LISFLOOD water quantity model, the EPIC water quality model, the LISQUAL combined water quantity, quality and hydro-economic model, and a multi-criteria optimisation routine. With this modelling environment, river basin scale simulations are carried out to assess the effects of water-retention measures, water-saving measures, and nutrient-reduction measures on several hydro-chemical indicators, such as the Water Exploitation Index (WEI), Nitrate and Phosphate concentrations in rivers, the 50-year return period river discharge as an indicator for flooding, and economic losses due to water scarcity for the agricultural sector, the manufacturing-industry sector, the energy-production sector and the domestic sector, as well as the economic loss due to flood damage. Recently, this model environment is being extended with a groundwater model to evaluate the effects of measures on the average groundwater table and available resources. Also, water allocation rules are addressed, while having environmental flow included as a minimum requirement for the environment. Economic functions are currently being updated as well. Recent development and examples will be shown and discussed, as well as open challenges.

  14. Short-term hydro generation scheduling of Three Gorges–Gezhouba cascaded hydropower plants using hybrid MACS-ADE approach

    International Nuclear Information System (INIS)

    Mo, Li; Lu, Peng; Wang, Chao; Zhou, Jianzhong

    2013-01-01

    Highlights: • MACS and ADE algorithms are hybridized as MACS-ADE method for solving STHGS problem. • An adaptive mutation is integrated into the proposed algorithm to avoid premature convergence. • MACS and ADE are run in parallel in search of better solution. • Several effective heuristic strategies are designed for dealing with various constraints of STHGS problem. - Abstract: Short-term hydro generation scheduling (STHGS) aims at determining optimal hydro generation scheduling to obtain minimum water consumption for one day or week while meeting various system constraints. In this paper, the STHGS problem is decomposed into two sub-problems: (i) unit commitment (UC) sub-problem; (ii) economic load dispatch (ELD) sub-problem. Then, we present a hybrid algorithm based on multi ant colony system (MACS) and differential evolution (DE) for solving the STHGS problem. First, MACS is used for dealing with UC sub-problem. A set of cooperating ant colonies cooperate to choose the unit state over the scheduled time horizon. Then, the adaptive differential evolution (ADE) is used to solve ELD sub-problem. MACS and ADE are run in parallel with adjusting their solutions in search of a better solution. Meanwhile, local and global pheromone updating rules in MACS and adaptive dynamic parameter adjusting strategy in DE are applied for enhancing the search ability of MACS-ADE. Finally, the proposed method is implemented to solve STHGS problem of Three Gorges–Gezhouba cascaded hydropower plants to verify the feasibility and effectiveness. Compared with other established methods, the simulation results reveal that the proposed MACS-ADE approach has the best convergence property, computational efficiency with less water consumption

  15. Thermo-hydro-mechanical behaviour of Boom clay; Comportement thermo-hydro-mecanique de l'argile de Boom

    Energy Technology Data Exchange (ETDEWEB)

    Le, T.T

    2008-01-15

    This thesis studied the thermo-hydro-mechanical properties of Boom clay, which was chosen to be the host material for the radioactive waste disposal in Mol, Belgium. Firstly, the research was concentrated on the soil water retention properties and the hydro-mechanical coupling by carrying out axial compression tests with suction monitoring. The results obtained permitted elaborating a rational experimental procedure for triaxial tests. Secondly, the systems for high pressure triaxial test at controlled temperature were developed to carry out compression, heating, and shearing tests at different temperatures. The obtained results showed clear visco-elasto-plastic behaviour of the soil. This behaviour was modelled by extending the thermo-elasto-plastic model of Cui et al. (2000) to creep effect. (author)

  16. Minimal Flavor Constraints for Technicolor

    DEFF Research Database (Denmark)

    Sakuma, Hidenori; Sannino, Francesco

    2010-01-01

    We analyze the constraints on the the vacuum polarization of the standard model gauge bosons from a minimal set of flavor observables valid for a general class of models of dynamical electroweak symmetry breaking. We will show that the constraints have a strong impact on the self-coupling and mas......We analyze the constraints on the the vacuum polarization of the standard model gauge bosons from a minimal set of flavor observables valid for a general class of models of dynamical electroweak symmetry breaking. We will show that the constraints have a strong impact on the self...

  17. Social Constraints on Animate Vision

    National Research Council Canada - National Science Library

    Breazeal, Cynthia; Edsinger, Aaron; Fitzpatrick, Paul; Scassellati, Brian

    2000-01-01

    .... In humanoid robotic systems, or in any animate vision system that interacts with people, social dynamics provide additional levels of constraint and provide additional opportunities for processing economy...

  18. Quasivariational Solutions for First Order Quasilinear Equations with Gradient Constraint

    Science.gov (United States)

    Rodrigues, José Francisco; Santos, Lisa

    2012-08-01

    We prove the existence of solutions for a quasi-variational inequality of evolution with a first order quasilinear operator and a variable convex set which is characterized by a constraint on the absolute value of the gradient that depends on the solution itself. The only required assumption on the nonlinearity of this constraint is its continuity and positivity. The method relies on an appropriate parabolic regularization and suitable a priori estimates. We also obtain the existence of stationary solutions by studying the asymptotic behaviour in time. In the variational case, corresponding to a constraint independent of the solution, we also give uniqueness results.

  19. Therapeutic efficacy of hydro-kinesiotherapy Programs in lumbar spondylosis

    Directory of Open Access Journals (Sweden)

    Ana-Maria BOTEZAN

    2015-12-01

    Full Text Available Lumbar spondylarthrosis is a degenerative disease that affects the joint structures of the lumbar spine. In the course of time, numerous studies on the role of hydro-kinesiotherapy in the treatment of lumbar spondylosis have been conducted. The aim of this research is motivated by the significantly high number of patients with chronic pain in the lumbar spine due to lumbar spondylosis, as well as by the negative impact on their quality of life through the impairment of the activities of daily living. The prospective longitudinal study was carried out at the Clinical Rehabilitation Hospital Cluj-Napoca. The study included 35 patients with chronic low back pain and mobility limitation in the lumbar spine. The patients were assigned to two groups: the study group formed by 20 patients and the control group consisting of 15 patients aged between 40-70 years. The treatment of the patients included in the study was performed over a two week period and consisted of a hydro-kinesiotherapy program, for the patients of the study group, the duration of a treatment session being 40 minutes. Both the subjects of the study group and of the control group also benefited from sedative massage of the lumbosacral spine, kinesiotherapy, laser therapy of the lumbar spine. The patients were evaluated using Schober’s test, the Visual Analogue Scale, the Oswestry index. These evaluation methods were applied to the patients of both groups at the beginning of the rehabilitation programs and after two weeks. The results of the study demonstrated the therapeutic efficacy of the medical rehabilitation programs that included hydro-kinesiotherapy programs. The patients of both groups had improvements through a decrease of lumbar pain, an increase in lumbar spine mobility, as well as in the patients’ ability to organize themselves in the activities of daily living. However, the patients of the study group, with a hydro-kinesiotherapy program performed for two weeks, had

  20. Hydro-Quebec annual report, 1991

    Energy Technology Data Exchange (ETDEWEB)

    1991-01-01

    This annual report for the Quebec electric utility presents an overview of the year's activities and its financial status, including export sales of electricity to New Brunswick, Ontario, New York State, and the New England states. Research programs and demonstration projects are described, as well as the utility's activities in Africa and Asia. Environmental and economic considerations for the province are presented. Financial data includes total sales, sales by sector, export sales, and rate changes. A financial statement is included. In 1991, public controversy arose over electricity exports, risk-and-profit sharing contracts with some industrial customers, and the impacts of hydroelectric development. A net income of $760 million was achieved, representing an 88.1% increase over the previous year when exceptional measures were required to offset cumulative years of low runoff. These measures were suspended in late 1990 but low 1991 precipitation forced the continued purchase of backup electricity. Energy efficiency programs resulted in savings equivalent to energy consumed by a town of 13,000 people. Exports accounted for 7.2% of total sales in 1991. The first three generating units of LaGrande-2-A, totalling 999 MW, were commissioned. The groundwork has been laid for the vast corporate strategy of total customer satisfaction entitled Defi performance. In 1991, annual interruption time per customer dropped to 5.32 hours. 5 figs., 5 tabs.

  1. Modifier constraint in alkali borophosphate glasses using topological constraint theory

    Energy Technology Data Exchange (ETDEWEB)

    Li, Xiang [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai 200237 (China); Zeng, Huidan, E-mail: hdzeng@ecust.edu.cn [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai 200237 (China); Jiang, Qi [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai 200237 (China); Zhao, Donghui [Unifrax Corporation, Niagara Falls, NY 14305 (United States); Chen, Guorong [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai 200237 (China); Wang, Zhaofeng; Sun, Luyi [Department of Chemical & Biomolecular Engineering and Polymer Program, Institute of Materials Science, University of Connecticut, Storrs, CT 06269 (United States); Chen, Jianding [Key Laboratory for Ultrafine Materials of Ministry of Education, School of Materials Science and Engineering, East China University of Science and Technology, Shanghai 200237 (China)

    2016-12-01

    In recent years, composition-dependent properties of glasses have been successfully predicted using the topological constraint theory. The constraints of the glass network are derived from two main parts: network formers and network modifiers. The constraints of the network formers can be calculated on the basis of the topological structure of the glass. However, the latter cannot be accurately calculated in this way, because of the existing of ionic bonds. In this paper, the constraints of the modifier ions in phosphate glasses were thoroughly investigated using the topological constraint theory. The results show that the constraints of the modifier ions are gradually increased with the addition of alkali oxides. Furthermore, an improved topological constraint theory for borophosphate glasses is proposed by taking the composition-dependent constraints of the network modifiers into consideration. The proposed theory is subsequently evaluated by analyzing the composition dependence of the glass transition temperature in alkali borophosphate glasses. This method is supposed to be extended to other similar glass systems containing alkali ions.

  2. Seismological Constraints on Geodynamics

    Science.gov (United States)

    Lomnitz, C.

    2004-12-01

    Earth is an open thermodynamic system radiating heat energy into space. A transition from geostatic earth models such as PREM to geodynamical models is needed. We discuss possible thermodynamic constraints on the variables that govern the distribution of forces and flows in the deep Earth. In this paper we assume that the temperature distribution is time-invariant, so that all flows vanish at steady state except for the heat flow Jq per unit area (Kuiken, 1994). Superscript 0 will refer to the steady state while x denotes the excited state of the system. We may write σ 0=(J{q}0ṡX{q}0)/T where Xq is the conjugate force corresponding to Jq, and σ is the rate of entropy production per unit volume. Consider now what happens after the occurrence of an earthquake at time t=0 and location (0,0,0). The earthquake introduces a stress drop Δ P(x,y,z) at all points of the system. Response flows are directed along the gradients toward the epicentral area, and the entropy production will increase with time as (Prigogine, 1947) σ x(t)=σ 0+α {1}/(t+β )+α {2}/(t+β )2+etc A seismological constraint on the parameters may be obtained from Omori's empirical relation N(t)=p/(t+q) where N(t) is the number of aftershocks at time t following the main shock. It may be assumed that p/q\\sim\\alpha_{1}/\\beta times a constant. Another useful constraint is the Mexican-hat geometry of the seismic transient as obtained e.g. from InSAR radar interferometry. For strike-slip events such as Landers the distribution of \\DeltaP is quadrantal, and an oval-shaped seismicity gap develops about the epicenter. A weak outer triggering maxiμm is found at a distance of about 17 fault lengths. Such patterns may be extracted from earthquake catalogs by statistical analysis (Lomnitz, 1996). Finally, the energy of the perturbation must be at least equal to the recovery energy. The total energy expended in an aftershock sequence can be found approximately by integrating the local contribution over

  3. Large-scale wind energy application. Transporting wind energy over long distances using an HVDC transmission line, in combination with hydro energy or biomass energy

    International Nuclear Information System (INIS)

    Coelingh, J.P.; Van Wijk, A.J.M.; Betcke, J.W.H.; Geuzendam, C.; Gilijamse, W.; Westra, C.A.; Curvers, A.P.W.M.; Beurskens, H.J.M.

    1995-08-01

    The main objective of the study on the title subject is to assess the long-term prospects for large-scale application of wind energy, in combination with hydro energy in Norway and in combination with biomass energy in Scotland. These countries have high wind resource areas, however they are located far away from load centres. The development of new transmission technologies as High Voltage Direct Current (HVDC) transmission lines, in combination with highly suitable places for wind energy in Norway and Scotland, forms the driving force behind this study. The following two cases are being considered: (1) a large-scale wind farm (1,000 MW) in Norway from which electricity is transmitted to The Netherlands by using an HVDC transmission line, in combination with hydro energy. Hydro energy already makes a large contribution to the energy supply of Norway. Wind farms can contribute to the electricity production and save hydro energy generated electricity and make the export of electricity profitable; and (2) a large-scale wind farm (1,000 MW) in Scotland from which electricity is transmitted to The Netherlands by using an HVDC transmission line, in combination with biomass energy. Scotland has a large potential for biomass production such as energy crops and forestry. Poplars and willows cultivated on set-aside land can be gasified and fed into modern combined-cycle plants to generate electricity. In Scotland the usable potential of wind energy may be limited in the short and medium term by the capacity of the grid. New connections can overcome this constraint and allow wind energy to be treated as a European Union resource rather than as a national resource. Thus, the concept of this study is to look at the possibilities of making a 1,000 MW link from The Netherlands to Norway or to Scotland, in order to supply electricity at competitive costs generated with renewable energy sources. 16 figs., 24 tabs., 80 refs

  4. Ontario hydro's aqueous discharge monitoring program

    International Nuclear Information System (INIS)

    Mehdi, S.H.; Booth, M.R.; Massey, R.; Herrmann, O.

    1992-01-01

    The Province of Ontario has legislated a comprehensive monitoring program for waterborne trace contaminants called MISA - Municipal Industrial Strategy for Abatement. The electric power sector regulation applies to all generating stations (Thermal, Nuclear, Hydraulic). The program commenced in June, 1990. The current phase of the regulation requires the operators of the plants to measure the detailed composition of the direct discharges to water for a one year period. Samples are to be taken from about 350 identified streams at frequencies varying from continuous and daily to quarterly. The data from this program will be used to determine the scope of the ongoing monitoring program and control. This paper discusses the preparation and planning, commissioning, training and early operations phase of the MISA program. In response, the central Analytical Laboratory and Environmental staff worked to develop a sampling and analytical approach which uses the plant laboratories, the central analytical laboratory and a variety of external laboratories. The approach considered analytical frequency, sample stability, presence of radioactivity, suitability of staff, laboratory qualifications, need for long term internal capabilities, availability of equipment, difficulty of analysis, relationship to other work and problems, capital and operating costs. The complexity of the sampling program required the development of a computer based schedule to ensure that all required samples were taken as required with phase shifts between major sampling events at different plants to prevent swamping the capability of the central or external laboratories. New equipment has been purchased and installed at each plant to collect 24 hour composite samples. Analytical equipment has been purchased for each plant for analysis of perishable analytes or of samples requiring daily or thrice weekly analysis. Training programs and surveys have been implemented to assure production of valid data

  5. Observational constraints on interstellar chemistry

    International Nuclear Information System (INIS)

    Winnewisser, G.

    1984-01-01

    The author points out presently existing observational constraints in the detection of interstellar molecular species and the limits they may cast on our knowledge of interstellar chemistry. The constraints which arise from the molecular side are summarised and some technical difficulties encountered in detecting new species are discussed. Some implications for our understanding of molecular formation processes are considered. (Auth.)

  6. Market segmentation using perceived constraints

    Science.gov (United States)

    Jinhee Jun; Gerard Kyle; Andrew Mowen

    2008-01-01

    We examined the practical utility of segmenting potential visitors to Cleveland Metroparks using their constraint profiles. Our analysis identified three segments based on their scores on the dimensions of constraints: Other priorities--visitors who scored the highest on 'other priorities' dimension; Highly Constrained--visitors who scored relatively high on...

  7. Fixed Costs and Hours Constraints

    Science.gov (United States)

    Johnson, William R.

    2011-01-01

    Hours constraints are typically identified by worker responses to questions asking whether they would prefer a job with more hours and more pay or fewer hours and less pay. Because jobs with different hours but the same rate of pay may be infeasible when there are fixed costs of employment or mandatory overtime premia, the constraint in those…

  8. An Introduction to 'Creativity Constraints'

    DEFF Research Database (Denmark)

    Onarheim, Balder; Biskjær, Michael Mose

    2013-01-01

    Constraints play a vital role as both restrainers and enablers in innovation processes by governing what the creative agent/s can and cannot do, and what the output can and cannot be. Notions of constraints are common in creativity research, but current contributions are highly dispersed due to n...

  9. Constraint Programming for Context Comprehension

    DEFF Research Database (Denmark)

    Christiansen, Henning

    2014-01-01

    A close similarity is demonstrated between context comprehension, such as discourse analysis, and constraint programming. The constraint store takes the role of a growing knowledge base learned throughout the discourse, and a suitable con- straint solver does the job of incorporating new pieces...

  10. Role of Pumped Storage Hydro Resources in Electricity Markets and System Operation: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Ela, E.; Kirby, B.; Botterud, A.; Milostan, C.; Krad, I.; Koritarov, V.

    2013-05-01

    The most common form of utility- sized energy storage system is the pumped storage hydro system. Originally, these types of storage systems were economically viable simply because they displace more expensive generating units. However, over time, as those expensive units became more efficient and costs declined, pumped hydro storage units no longer have the operational edge. As a result, in the current electricity market environment, pumped storage hydro plants are struggling. To offset this phenomenon, certain market modifications should be addressed. This paper will introduce some of the challenges faced by pumped storage hydro plants in today's markets and purpose some solutions to those problems.

  11. Business continuity

    International Nuclear Information System (INIS)

    Breunhoelder, Gert

    2002-01-01

    This presentation deals with the following keypoints: Information Technology (IT) Business Continuity and Recovery essential for any business; lessons learned after Sept. 11 event; Detailed planning, redundancy and testing being the key elements for probability estimation of disasters

  12. Continuous tokamaks

    International Nuclear Information System (INIS)

    Peng, Y.K.M.

    1978-04-01

    A tokamak configuration is proposed that permits the rapid replacement of a plasma discharge in a ''burn'' chamber by another one in a time scale much shorter than the elementary thermal time constant of the chamber first wall. With respect to the chamber, the effective duty cycle factor can thus be made arbitrarily close to unity minimizing the cyclic thermal stress in the first wall. At least one plasma discharge always exists in the new tokamak configuration, hence, a continuous tokamak. By incorporating adiabatic toroidal compression, configurations of continuous tokamak compressors are introduced. To operate continuous tokamaks, it is necessary to introduce the concept of mixed poloidal field coils, which spatially groups all the poloidal field coils into three sets, all contributing simultaneously to inducing the plasma current and maintaining the proper plasma shape and position. Preliminary numerical calculations of axisymmetric MHD equilibria in continuous tokamaks indicate the feasibility of their continued plasma operation. Advanced concepts of continuous tokamaks to reduce the topological complexity and to allow the burn plasma aspect ratio to decrease for increased beta are then suggested

  13. Vocabulary Constraint on Texts

    Directory of Open Access Journals (Sweden)

    C. Sutarsyah

    2008-01-01

    Full Text Available This case study was carried out in the English Education Department of State University of Malang. The aim of the study was to identify and describe the vocabulary in the reading text and to seek if the text is useful for reading skill development. A descriptive qualitative design was applied to obtain the data. For this purpose, some available computer programs were used to find the description of vocabulary in the texts. It was found that the 20 texts containing 7,945 words are dominated by low frequency words which account for 16.97% of the words in the texts. The high frequency words occurring in the texts were dominated by function words. In the case of word levels, it was found that the texts have very limited number of words from GSL (General Service List of English Words (West, 1953. The proportion of the first 1,000 words of GSL only accounts for 44.6%. The data also show that the texts contain too large proportion of words which are not in the three levels (the first 2,000 and UWL. These words account for 26.44% of the running words in the texts.  It is believed that the constraints are due to the selection of the texts which are made of a series of short-unrelated texts. This kind of text is subject to the accumulation of low frequency words especially those of content words and limited of words from GSL. It could also defeat the development of students' reading skills and vocabulary enrichment.

  14. Hydro-meteorological extreme events in the 18th century in Portugal

    Science.gov (United States)

    Fragoso, Marcelo; João Alcoforado, Maria; Taborda, João Paulo

    2013-04-01

    The present work is carried out in the frame of the KLIMHIST PROJECT ("Reconstruction and model simulations of past climate in Portugal using documentary and early instrumental sources, 17th-19th century)", and is devoted to the study of hydro-meteorological extreme events during the last 350 years, in order to understand how they have changed in time and compare them with current analogues. More specifically, the results selected to this presentation will focus on some hydro-meteorological extreme events of the 18th century, like severe droughts, heavy precipitation episodes and windstorms. One of the most noteworthy events was the winterstorm Bárbara (3rd to 6th December 1739), already studied in prior investigations (Taborda et al, 2004; Pfister et al, 2010), a devastating storm with strong impacts in Portugal caused by violent winds and heavy rainfall. Several other extreme events were detected by searching different documentary archives, including individual, administrative and ecclesiastic sources. Moreover, a more detailed insight to the 1783-1787 period will be made with regard the Lisbon region, taking into consideration the availability of information for daily meteorological observations as well as documentary evidences, like descriptions from Gazeta de Lisboa, the periodic with more continuous publication in the 18thcentury. Key-words: Instrumental data, Documentary data, Extreme events, Klimhist Project, Portugal References Pfister, C., Garnier, E., Alcoforado, M.J., Wheeler, D. Luterbacher, J. Nunes, M.F., Taborda, J.P. (2010) The meteorological framework and the cultural memory of three severe winter-storms in early eighteenth-century Europe, Climatic Change, 101, 1-2, 281-310 Taborda, JP; Alcoforado, MJ and Garcia, JC (2004) O Clima do Sul de Portugal no Séc.XVIII, Centro de Estudos Geográficos, Área de de Investigação de Geo-Ecologia, relatório no 2

  15. Development of Dalaelven hydro power scheme in Sweden

    International Nuclear Information System (INIS)

    Kokko, Voitto; Hjerthen, Peter; Ingfaelt, Hans; Loewen, Karl-Erik; Sjoegren, Arne

    2015-01-01

    The Dalaelven hydro scheme is located in central Sweden. Fortum has in the scheme 50 dams and 35 hydro power plants producing 4 TWh energy with a capacity of 970 MW. The main reservoirs are Lake Siljan and Traengsletsjoen with Traengslet dam, the highest earth-filled dam in Sweden. Development of the hydro scheme started 1878 with construction of four power plants for industry until 1930. From 1931 to 1974 15 power plants were built for increasing electricity consumption. De-regulation of the energy market in 1990's and EU environmental targets in 2000's resulted in the rehabilitation of ten power plants between 1990 and 2014 with increased annual energy production of 377 GWh (29%) and capacity 124 MW (59%). This energy decreases the annual CO 2 emissions with 125918 tons in comparison to production of the same amount of energy by coal. In several cases the rehabilitation was made in new power houses, allowing the development of the layout and technology of civil structures, and use of state-of-art equipment. Sweden uses the green certificate system, and 235 GWh of the energy received this certificate. Other environmental benefits come from use of the environmentally friendly Kaplan turbines and construction of some new fish pass. There are further plans to increase the spillway capacity of Traengslet dam and to rehabilitate eight power plant units. The possibilities of obtaining the Environmental licences for the rehabilitations has became challenging in the past years and green certificates are nowadays agreed only for increased energy. (authors)

  16. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  17. Hydro and nuclear power for African less-carbon development

    Energy Technology Data Exchange (ETDEWEB)

    El-Gazzar, Mohamed; Ibrahim, Yassin Mohamed; Bedrous, Maher Aziz

    2007-07-01

    Though the overall picture reveal availability of enormous energy resources which far exceed energy requirements of Africa, most of these resources are grossly underutilized, particularly hydro and nuclear resources. It suggests that Africa's problem is not lack of energy resources but its development and utilization. The region will remain a major net exporter of energy for several decades to com. In dealing with its energy problems Africa faces a unique set of initial conditions, defined mainly by its level and pattern of economic growth, social and demographic characteristics, energy resource endowment, location distances between supply sources and consumption areas, technological underdevelopment, and poverty-driven energy-environment conflict. A key challenge is the optimal utilization of the Africa's energy resources to facilitate both individual country and regional energy and economic development. Stronger emphasis on a more integrated energy supply network based on more widespread regional initiatives, particularly in electricity is essential to sustainable energy development in Africa. This paper discusses the prospects for hydro and nuclear power in Africa. The continent is the poorest in the world. The lack of reliable, accessible and affordable energy hinders its development. Hydro and nuclear power promises to be the least-carbon energy sources, while being the cheapest and most reliable among all. The role the hydropower can play in securing a sustainable energy future for Africa is highly emphasized. Also, nuclear power has many advantages to Africa. Opportunities for hydropower and nuclear power in Africa are all considered. Advantages and disadvantages are also all discussed. (auth)

  18. Continuous Dropout.

    Science.gov (United States)

    Shen, Xu; Tian, Xinmei; Liu, Tongliang; Xu, Fang; Tao, Dacheng

    2017-10-03

    Dropout has been proven to be an effective algorithm for training robust deep networks because of its ability to prevent overfitting by avoiding the co-adaptation of feature detectors. Current explanations of dropout include bagging, naive Bayes, regularization, and sex in evolution. According to the activation patterns of neurons in the human brain, when faced with different situations, the firing rates of neurons are random and continuous, not binary as current dropout does. Inspired by this phenomenon, we extend the traditional binary dropout to continuous dropout. On the one hand, continuous dropout is considerably closer to the activation characteristics of neurons in the human brain than traditional binary dropout. On the other hand, we demonstrate that continuous dropout has the property of avoiding the co-adaptation of feature detectors, which suggests that we can extract more independent feature detectors for model averaging in the test stage. We introduce the proposed continuous dropout to a feedforward neural network and comprehensively compare it with binary dropout, adaptive dropout, and DropConnect on Modified National Institute of Standards and Technology, Canadian Institute for Advanced Research-10, Street View House Numbers, NORB, and ImageNet large scale visual recognition competition-12. Thorough experiments demonstrate that our method performs better in preventing the co-adaptation of feature detectors and improves test performance.

  19. ?Strange Attractors (chaos) in the hydro-climatology of Colombia?

    International Nuclear Information System (INIS)

    Poveda Jaramillo, German

    1997-01-01

    Inter annual hydro-climatology of Colombia is strongly influenced by extreme phases of ENSO, a phenomenon exhibiting many features of chaotic non-linear system. The possible chaotic nature of Colombian hydrology is examined by using time series of monthly precipitation at Bogota (1866-1992) and Medellin (1908-1995), and average stream flows of the Magdalena River at Puerto Berrio. The power spectrum, the Haussdorf-Besikovich (fractal) dimension, the correlation dimension, and the largest Lyapunov exponent are estimated for the time series. Ideas of hydrologic forecasting and predictability are discussed in the context of nonlinear dynamical systems exhibit chaotic behavior

  20. Production inefficiency of electricity markets with hydro generation

    International Nuclear Information System (INIS)

    Philpott, Andy; Guan, Ziming; Khazaei, Javad; Zakeri, Golbon

    2010-01-01

    Electricity market designs that decentralize decision making for participants can lead to inefficiencies in the presence of nonconvexity or missing markets. This has been shown in the case of unit-commitment problems that can make a decentralized market equilibrium less efficient than a centrally planned solution. Less attention has been focused on systems with large amounts of hydro-electric generation. We describe the results of an empirical study of the New Zealand wholesale electricity market that attempts to quantify production efficiency losses by comparing market outcomes with a counterfactual central plan. (author)

  1. Role of pump hydro in electric power systems

    Science.gov (United States)

    Bessa, R.; Moreira, C.; Silva, B.; Filipe, J.; Fulgêncio, N.

    2017-04-01

    This paper provides an overview of the expected role that variable speed hydro power plants can have in future electric power systems characterized by a massive integration of highly variable sources. Therefore, it is discussed the development of a methodology for optimising the operation of hydropower plants under increasing contribution from new renewable energy sources, addressing the participation of a hydropower plant with variable speed pumping in reserve markets. Complementarily, it is also discussed the active role variable speed generators can have in the provision of advanced frequency regulation services.

  2. HydroGEM, a hydrogen fuelled utility vehicle. Case study

    International Nuclear Information System (INIS)

    Hoevenaars, A.J.; Kraaij, G.J.; De Bruijne, M.; Weeda, M.

    2010-02-01

    This report describes the conversion of a Global Electric Motorcars (GEM, a Chrysler company) electric utility vehicle into a Fuel Cell Vehicle called HydroGEM, at the Energy research Centre of the Netherlands (ECN). The report is prepared as a case study within the framework of Task 18 on 'Evaluation of Integrated Hydrogen Systems' of the IEA Hydrogen Implementing Agreement. The vehicle's fuel cell system was designed in 2005, manufactured and built into the vehicle in 2006 and operated from 2007 onwards. The design-choices, assembly, operation and maintenance-issues are presented and discussed.

  3. Decision support for the management of water resources at Sub-middle of the São Francisco river basin in Brazil using integrated hydro-economic modeling and scenarios for land use changes

    Science.gov (United States)

    Moraes, M. G. A.; Souza da Silva, G.

    2016-12-01

    Hydro-economic models can measure the economic effects of different operating rules, environmental restrictions, ecosystems services, technical constraints and institutional constraints. Furthermore, water allocation can be improved by considering economical criteria's. Likewise, climate and land use change can be analyzed to provide resilience. We developed and applied a hydro-economic optimization model to determine the optimal water allocation of main users in the Lower-middle São Francisco River Basin in Northeast (NE) Brazil. The model uses demand curves for the irrigation projects, small farmers and human supply, rather than fixed requirements for water resources. This study analyzed various constraints and operating alternatives for the installed hydropower dams in economic terms. A seven-year period (2000-2006) with water scarcity in the past has been selected to analyze the water availability and the associated optimal economic water allocation. The used constraints are technical, socioeconomic and environmental. The economically impacts of scenarios like prioritizing human consumption, impacts of the implementation of the São Francisco river transposition, human supply without high distribution losses, environmental hydrographs, forced reservoir level control, forced reduced reservoir capacity, alteration of lower flow restriction were analyzed. The results in this period show that scarcity costs related ecosystem service and environmental constraints are significant, and have major impacts (increase of scarcity cost) for consumptive users like irrigation projects. In addition, institutional constraints such as prioritizing human supply, minimum release limits downstream of the reservoirs and the implementation of the transposition project impact the costs and benefits of the two main economic sectors (irrigation and power generation) in the region of the Lower-middle of the São Francisco river basin. Scarcity costs for irrigation users generally

  4. Continuity theory

    CERN Document Server

    Nel, Louis

    2016-01-01

    This book presents a detailed, self-contained theory of continuous mappings. It is mainly addressed to students who have already studied these mappings in the setting of metric spaces, as well as multidimensional differential calculus. The needed background facts about sets, metric spaces and linear algebra are developed in detail, so as to provide a seamless transition between students' previous studies and new material. In view of its many novel features, this book will be of interest also to mature readers who have studied continuous mappings from the subject's classical texts and wish to become acquainted with a new approach. The theory of continuous mappings serves as infrastructure for more specialized mathematical theories like differential equations, integral equations, operator theory, dynamical systems, global analysis, topological groups, topological rings and many more. In light of the centrality of the topic, a book of this kind fits a variety of applications, especially those that contribute to ...

  5. Hybrid systems with constraints

    CERN Document Server

    Daafouz, Jamal; Sigalotti, Mario

    2013-01-01

    Control theory is the main subject of this title, in particular analysis and control design for hybrid dynamic systems.The notion of hybrid systems offers a strong theoretical and unified framework to cope with the modeling, analysis and control design of systems where both continuous and discrete dynamics interact. The theory of hybrid systems has been the subject of intensive research over the last decade and a large number of diverse and challenging problems have been investigated. Nevertheless, many important mathematical problems remain open.This book is dedicated mainly to

  6. Level-Set Topology Optimization with Aeroelastic Constraints

    Science.gov (United States)

    Dunning, Peter D.; Stanford, Bret K.; Kim, H. Alicia

    2015-01-01

    Level-set topology optimization is used to design a wing considering skin buckling under static aeroelastic trim loading, as well as dynamic aeroelastic stability (flutter). The level-set function is defined over the entire 3D volume of a transport aircraft wing box. Therefore, the approach is not limited by any predefined structure and can explore novel configurations. The Sequential Linear Programming (SLP) level-set method is used to solve the constrained optimization problems. The proposed method is demonstrated using three problems with mass, linear buckling and flutter objective and/or constraints. A constraint aggregation method is used to handle multiple buckling constraints in the wing skins. A continuous flutter constraint formulation is used to handle difficulties arising from discontinuities in the design space caused by a switching of the critical flutter mode.

  7. Continuation calculus

    NARCIS (Netherlands)

    Geron, B.; Geuvers, J.H.; de'Liguoro, U.; Saurin, A.

    2013-01-01

    Programs with control are usually modeled using lambda calculus extended with control operators. Instead of modifying lambda calculus, we consider a different model of computation. We introduce continuation calculus, or CC, a deterministic model of computation that is evaluated using only head

  8. Demystification and localization in the adoption of micro-hydro technology : Insights from India

    NARCIS (Netherlands)

    Höffken, J.I.

    2016-01-01

    The phrase ‘small is beautiful’ holds true for the micro-hydro plants discussed in this article. Micro-hydro plants can convert the energy of falling water into electricity. In India, access to electricity cannot be taken for granted, especially in rural areas, which do not yet have grid extension

  9. 75 FR 11153 - Hydro Energy Technologies, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2010-03-10

    ...-long gravity dam; (2) a existing 36-acre impoundment with a storage capacity of 250 acre feet.; (3) an... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13627-000] Hydro Energy..., Motions To Intervene, and Competing Applications March 1, 2010. On November 6, 2009, Hydro Energy...

  10. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  11. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... Project, FERC No. 9403. All correspondence should be forwarded to Rivermill Hydroelectric, Inc., c/o Essex...

  12. 77 FR 26796 - HydroGenetics, Inc.; Order of Suspension of Trading

    Science.gov (United States)

    2012-05-07

    ... Trading May 2, 2012. It appears to the Securities and Exchange Commission that there is a lack of current... require a suspension of trading in the securities of HydroGenetics. Therefore, it is ordered, pursuant to Section 12(k) of the Securities Exchange Act of 1934, that trading in the securities of HydroGenetics is...

  13. More than energy: Ontario Hydro final annual report, January 1998 - March 1999

    International Nuclear Information System (INIS)

    1999-01-01

    Ontario Hydro ceased operations on March 31, 1999 and its assets and functions were transferred by provincial statute to two successor corporations: Ontario Power Generation Corp. (OPG) and Ontario Hydro Services Inc. Its functions were also transferred to the Independent Electricity Market Operator and the Electrical Safety Authority, two not-for-profit agencies. The original act defining Ontario Hydro was replaced by the Energy Competition Act, 1998. Until the demerger of the company on April 1, 1999, Ontario Hydro served 108 direct industrial clients, almost one million retail clients and 255 municipal utilities. Ontario Power Generation inherited Ontario Hydro's generating portfolio, making it one of the largest power producers in North America in terms of installed capacity. The OPG system includes 69 hydroelectric stations, three nuclear sites, and six operating fossil fueled stations. Total installed system capacity is approximately 31,000 megawatts, and Ontario Hydro's total sales in 1998 were almost 139 terawatt hours. Ontario Hydro Services Company is an energy services-based transmission and distribution company. It owns and maintains 29,000 km of transmission lines, 114,700 km of distribution lines, 245 km of high-voltage underground cable, 256 transformer stations, 928 distribution and regulation stations, and 250 microwave stations. It also retains the retail business held by Ontario Hydro, which serves over 950,000 clients, and the transmission and generating business for 23 remote communities in Northern Ontario

  14. 77 FR 20808 - Black Bear Hydro Partners, LLC; Notice of Application Accepted for Filing, Ready for...

    Science.gov (United States)

    2012-04-06

    ... March 14, 2012. d. Applicant: Black Bear Hydro Partners, LLC. e. Name of Projects: Orono Project 2710.... 791a-825r. h. Applicant Contact: Mr. Scott D. Hall, Black Bear Hydro Partners, LLC, P.O. Box 276... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 2710-057; 2712-074] Black...

  15. 75 FR 47808 - Verde Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13819-000] Verde Hydro, LLC... Intervene, and Competing Applications August 2, 2010. On July 21, 2010, Verde Hydro, LLC filed an... the feasibility of the Verde Hydroelectric Project, located in Maricopa County, in the State of...

  16. 76 FR 24014 - Renew Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2011-04-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13872-000] Renew Hydro, LLC... Intervene, and Competing Applications On October 19, 2010, Renew Hydro, LLC filed an application for a...) a new powerhouse; (3) a crest-mounted walkway carrying hydraulic and electrical conduits; (4) one...

  17. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model

    International Nuclear Information System (INIS)

    Catalao, J.P.S.; Mariano, S.J.P.S.; Mendes, V.M.F.; Ferreira, L.A.F.M.

    2006-01-01

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning a head-dependent hydro chain. We use a method based on nonlinear programming (NLP), namely quadratic programming, to consider hydroelectric power generation a function of water discharge and of the head. The method has been applied successfully to solve a test case based on a realistic cascaded hydro system with a negligible computational time requirement and is also applied to show that the role played by reservoirs in the hydro chain do not depend only on their relative position. As a new contribution to earlier studies, which presented reservoir operation rules mainly for medium and long-term planning procedures, we show that the physical data defining hydro chain parameters used in the nonlinear model have an effect on the STHS, implying different optimal storage trajectories for the reservoirs accordingly not only with their position in the hydro chain but also with the new parameterisation defining the data for the hydro system. Moreover, considering head dependency in the hydroelectric power generation, usually neglected for hydro plants with a large storage capacity, provides a better short-term management of the conversion of the potential energy available in the reservoirs into electric energy, which represents a major advantage for the hydroelectric utilities in a competitive electricity market. (author)

  18. 76 FR 44323 - National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of...

    Science.gov (United States)

    2011-07-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-49-000] National Grid Transmission Services Corporation; Bangor Hydro Electric Company; Notice of Petition for Declaratory Order Take..., 18 CFR 385.207, National Grid Transmission Services Corporation and Bangor Hydro Electric Company...

  19. 76 FR 36533 - Bangor Hydro Electric Company; Notice of Request for Waiver

    Science.gov (United States)

    2011-06-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-5-000] Bangor Hydro Electric Company; Notice of Request for Waiver Take notice that on June 13, 2011, pursuant to section 358.1(d) of the Commission's regulations, 18 CFR 358.1(d) (2011), Bangor Hydro Electric Company (Bangor...

  20. 78 FR 62350 - FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14491-000] FFP Qualified Hydro 14, LLC; Western Minnesota Municipal Power Agency; Notice Announcing... applications were filed by FFP Qualified Hydro 14, LLC for Project No. 13579-002 and Western Minnesota... regular business day. See 18 CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time...

  1. 78 FR 62350 - Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-10-18

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC; Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR 385.2001(a)(2) (2013). On October 21, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  2. 78 FR 70549 - Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice Announcing...

    Science.gov (United States)

    2013-11-26

    .... 14540-000] Lock+ Hydro Friends Fund III, LLC, Western Minnesota Municipal Power Agency; Notice...+ Hydro Friends Fund III, LLC for Project No. 14539-000 and Western Minnesota Municipal Power Agency for... CFR.385.2001(a)(2) (2013). On November 25, 2013, at 10:00 a.m. (Eastern Time), the Secretary of the...

  3. Machine tongues. X. Constraint languages

    Energy Technology Data Exchange (ETDEWEB)

    Levitt, D.

    Constraint languages and programming environments will help the designer produce a lucid description of a problem domain, and then of particular situations and problems in it. Early versions of these languages were given descriptions of real world domain constraints, like the operation of electrical and mechanical parts. More recently, the author has automated a vocabulary for describing musical jazz phrases, using constraint language as a jazz improviser. General constraint languages will handle all of these domains. Once the model is in place, the system will connect built-in code fragments and algorithms to answer questions about situations; that is, to help solve problems. Bugs will surface not in code, but in designs themselves. 15 references.

  4. Identifying and Evaluating Chaotic Behavior in Hydro-Meteorological Processes

    Directory of Open Access Journals (Sweden)

    Soojun Kim

    2015-01-01

    Full Text Available The aim of this study is to identify and evaluate chaotic behavior in hydro-meteorological processes. This study poses the two hypotheses to identify chaotic behavior of the processes. First, assume that the input data is the significant factor to provide chaotic characteristics to output data. Second, assume that the system itself is the significant factor to provide chaotic characteristics to output data. For solving this issue, hydro-meteorological time series such as precipitation, air temperature, discharge, and storage volume were collected in the Great Salt Lake and Bear River Basin, USA. The time series in the period of approximately one year were extracted from the original series using the wavelet transform. The generated time series from summation of sine functions were fitted to each series and used for investigating the hypotheses. Then artificial neural networks had been built for modeling the reservoir system and the correlation dimension was analyzed for the evaluation of chaotic behavior between inputs and outputs. From the results, we found that the chaotic characteristic of the storage volume which is output is likely a byproduct of the chaotic behavior of the reservoir system itself rather than that of the input data.

  5. Sustainability Challenge of Micro Hydro Power Development in Indonesia

    Science.gov (United States)

    Didik, H.; Bambang, P. N.; Asep, S.; Purwanto, Y. A.

    2018-05-01

    Rural electrification using renewable energy is the best choice for many locations that far away from national grid. Many renewable energy project have been built for rural electrification such as micro hydro power plant (MHPP) and solar photovoltaic (SPV). Sustainability still the main challenge of off-grid renewable energy development for off-grid rural electrification in Indonesia. The objective of this paper is to review sustainability of micro hydro power development in Indonesia. The research method was done by field observation, interview with MHPP management, and reviewing some research about MHPP in Indonesia. Sustainability issues include various aspects that can be classified into 5 dimensions: technical, economic, socio-cultural, institutional, and environmental. In technical factors that lead to sustainability problem are: improper MHPP design and construction, improper operation and maintenance, availability of spare parts and expertise. In the economic dimension are generally related to: low electricity tariff and utilization of MHPP for productive use. In the social dimension are: the growth of consumer’s load exceeding the capacity, reduced number of consumers, lack of external institutional support. In the institutional side, it is generally related to the ability of human resources in managing, operating and maintaining of MHPP. Environmental factors that lead the sustainability problems of MHPP are: scarcity of water discharge, conflict of water resources, land conversion over the watershed, and natural disasters.

  6. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Van Ackere, Ann [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  7. Managing a hydro-energy reservoir: A policy approach

    Energy Technology Data Exchange (ETDEWEB)

    Ackere, Ann van, E-mail: Ann.vanAckere@unil.c [HEC Lausanne, Internef, Universite de Lausanne, CH 1015 Lausanne, Dorigny (Switzerland); Ochoa, Patricia, E-mail: Patricia.Ochoa@edfenergy.co [London Business School, Regent' s Park, London NW1 4SA (United Kingdom)

    2010-11-15

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market.

  8. Hydro One smart meter/smart grid : realizing the vision

    Energy Technology Data Exchange (ETDEWEB)

    Stevens, R. [Hydro One Networks Inc., Toronto, ON (Canada)

    2010-07-01

    Ontario's Hydro One Networks has been installing smart meters as part of its smart grid plan since 2007. The smart grid plan forms part of the utility's overall aim to create an energy conservation culture across the province. The utility now has over 1 million installed meters over a 640,000{sup 2} km territory. The smart grid planning team has adopted the use of an upgraded open protocol standards-based communications as part of its 2-way high bandwidth network. The utility is using a 1.8 Ghz worldwide interoperability for microwave access (WiMAX) spectrum designed specifically for the protection of electric utility infrastructure. The utility is now incorporating proof-of-concept applications including automated reclosers, remote terminal units, demand management devices and mobile technologies for use in its smart grid procedures. Various smart zone business scenarios were also described in this power point presentation, as well as details of Hydro One's integration plans for vendors and other power systems. tabs., figs.

  9. Distributed power in Afghanistan: The Padisaw micro-hydro project

    International Nuclear Information System (INIS)

    Hallett, Michael

    2009-01-01

    The provision of electricity is a vital need in reconstruction and development situations, like that in Afghanistan. Indeed, according to the Afghan government's Afghan National Development Strategy (ANDS) the need for electricity featured in 80% of the Provincial Development Plans as a top priority. With the help of the International Community, the government of Afghanistan is attempting to develop a new market oriented approach to the nationwide provision of electrical power. Although the bulk of the electrification effort is directed toward large scale construction of a national grid, the ANDS explicitly mentions a role for 'micro-hydro, solar, waste and small scale diesel power and energy generating sources'. This article will describe a micro-hydro project in Padisaw village, in the Nurgaram district of Nuristan province located in Northeastern Afghanistan and the role Provincial Reconstruction Team played in working with the local community through the project planning and building processes and offer some observation on how, as the Afghan National Development Strategy is executed, the private sector can play an increasingly significant role in the Afghan distributed energy arena. (author)

  10. HydroCube: an entity-relationship hydrogeological data model

    Science.gov (United States)

    Wojda, Piotr; Brouyère, Serge; Derouane, Johan; Dassargues, Alain

    2010-12-01

    Managing, handling and accessing hydrogeological information depends heavily on the applied hydrogeological data models, which differ between institutions and countries. The effective dissemination of hydrogeological information requires the convergence of such models to make hydrogeological information accessible to multiple users such as universities, water suppliers, and administration and research organisations. Furthermore, because hydrogeological studies are complex, they require a wide variety of high-quality hydrogeological data with appropriate metadata in clearly designed and coherent structures. A need exists, therefore, to develop and implement hydrogeological data models that cover, as much as possible, the full hydrogeological domain. A new data model, called HydroCube, was developed for the Walloon Region in Belgium in 2005. The HydroCube model presents an innovative holistic project-based approach which covers a full set of hydrogeological concepts and features, allowing for effective hydrogeological project management. The model stores data relating to the project locality, hydrogeological equipment, and related observations and measurements. In particular, it focuses on specialized hydrogeological field experiments such as pumping and tracer tests. This logical data model uses entity-relationship diagrams and it has been implemented in the Microsoft Access environment. It has been enriched with a fully functional user interface.

  11. Electricity production by hydro power plants: possibilities of forecasting

    International Nuclear Information System (INIS)

    Barkans, J.; Zicmane, I.

    2004-01-01

    Hydro energy accounts for 17% of global electricity production and is the most important source of renewable energies actively used today, being at the same time the least influential ecologically. Its only disadvantages is that this kind of energy is difficult to forecast, which hinders not only the planning of tariffs, year budgets and investments, but also contractual negotiations in particular month. The paper shows that the forecasting of hydro energy production can be linked to certain natural processes, namely, to the cyclic behaviour observed for water flows of the world's rivers. The authors propose a method according to which the forecasting procedure is performed using the data of observations as signals applied to special digital filters transforming the water flow process into integral and differential forms, which after appropriate treatment are expected again in usual water flow units. For this purpose the water flow integral function is to be divided, by means of spectral analysis, into 'low-frequency' (with a semi-period of 44 years) and 'high-frequency' (4-6 year semi-periods) components, which are of different origin. Each of them should be forecasted separately, with the following summation of the results. In the research it is shown that the cyclic fluctuations of world rivers' water flows are directly associated with variations in the Solar activity. (authors)

  12. Groundwater impact studies at three Ontario Hydro coal ash landfills

    International Nuclear Information System (INIS)

    Johnston, H.M.; Vorauer, A.G.; Chan, H.T.

    1992-01-01

    Ontario Hydro has produced on the order of 21 million Mg of coal fly ash over the past 40 years, of which, 80% has gone to various landfill sites in the province of Ontario. Hydrogeologic investigations have been performed in the vicinity of three Ontario Hydro coal ash landfill sites to assess the environmental impact of fly ash landfilling on the local groundwater regime. Two of the waste management facilities are associated with thermal generating stations (Lambton TGS and Nanticoke TGS) and are founded on relatively impermeable clay deposits. The third site, Birchwood Park, is a former sand and gravel pit for which the landfill design did not incorporate the use of a liner material. The rates of groundwater flow through the overburden materials a the three sites vary from less than 1 cm/a at the Lambton TGS site, to between 3.45 cm/a and 115 cm/a at contaminant transport at these sites also varies from being controlled by molecular diffusion to advection. This paper discusses the migration rates of contaminants from fly ash leachate at each of the three sites with implications to landfill containment and design

  13. Small hydro in Ukraine: To invest or not to invest?

    Energy Technology Data Exchange (ETDEWEB)

    Loechen, Liv Arntzen

    2011-07-01

    The vast and unexploited renewable energy potential and the introduction of green tariffs in 2009 have made Ukraine an attractive location for investors within the renewable energy sector. The Green Tariff system offers developers and investors the highest feed-in tariffs in Eastern Europe, and thus far covers alternative energy production from biomass, biogas, wind power plants and hydropower plants. Ukraine has a history in both large- and small hydro production. Whereas the potential of the country's big rivers is now to a great extent exploited, this is not the case for the smaller watercourses. Ukraine is well endowed with small rivers, approximately 60,000 of which can be classified as 'very small'. Most of these are located in the western part of the country, near the Carpathian Mountains. However, despite the natural potential, foreign investors should be aware of the potential risks and hurdles. The country has a huge problem with corruption, and the process of obtaining licenses is not straight forward. On the whole, it can be worthwhile exploring the possibilities of small hydro production in Ukraine for those who can deal with a high level of risk and uncertainty. If not, one would be better advised to look for investment locations elsewhere.(auth)

  14. Managing a hydro-energy reservoir: A policy approach

    International Nuclear Information System (INIS)

    Van Ackere, Ann; Ochoa, Patricia

    2010-01-01

    Liberalisation and privatisation have increased the need to gain more understanding into the management of hydro storage (HS) plants. We analyse what types of reservoir management policies enable an owner or a public authority to achieve their respective objectives. By 'policy' we understand simple, easily applicable decision rules, which enable a decision maker to decide when and how much to produce based on currently available information. We use a stylised deterministic simulation model of a hydro-power producer (HP) who behaves strategically. We study a non-liberalised market, where the authorities aim to minimise the total electricity cost for customers and a liberalised market where the HP attempts to maximise his contribution. This enables us to evaluate the impact of the liberalisation of HS production decisions on production volumes and electricity prices. We conclude that imposing rigid policies with the aim of limiting the potential for strategic behaviour can create incentives to produce only at very high prices throughout the year. This can lead to very high total costs, especially when the producer has most flexibility (large reservoirs combined with large turbine capacity). More surprisingly, we observe lower total production in a non-liberalised market. (author)

  15. Financial treatment of demand management expenditures at Ontario Hydro

    International Nuclear Information System (INIS)

    Ariss, D.G.

    1990-01-01

    Ontario Hydro's demand side management (DSM) plan comprises reduction of load, load shifting, and peak shaving. It includes an accounting policy applied only to measures which reduce demand by the increase in the efficiency of electricity of utilization or by the shifting of load from peak periods to off-peak periods. In order to choose the pertinent periods for which the DSM expenditures should be recovered, the utility has considered three accounting options: expensing all DSM expenditures as incurred; deferring all DSM expenditures; or deferring only those DSM expenditures that meet specified criteria. Ontario Hydro has chosen the last option, since it is in conformity with generally accepted accounting principles. This option is based on the matching principle, under which costs and revenues that are linked to each other in a cause-and-effect relationship should be recognized in the same accounting period. It has also been judged advantageous to amortize the deferred expenses corresponding to each measure over appropriate periods. It has also been established that the amortization period should begin immediately after each measure has been put into operation. This accounting policy ensures that expenses relating to DSM are accounted in a pertinent and uniform manner. 6 refs

  16. Rate proposal for 1993 and 1994 [Hydro-Quebec

    International Nuclear Information System (INIS)

    1994-01-01

    In its development plan, Hydro-Quebec has the goal of aligning its average rate increases with the inflation rate over the period 1993-2000. The near- and long-term evolution of rates must also follow the evolution of the costs of supply and assure the financial stability of the utility. The average annual increase target prices for 1993-95 is 3.5%. In 1993, the increase in supply cost is attributable to startup of service from the LaGrande 2-A and Becancour stations, as well as to energy efficiency programs and improvements in quality of service. In 1994-95, supply cost increases are related mainly to the second phase of the LaGrande complex. The present rate proposal is for two years and assures that rates will not increase beyond the projected rates of inflation of 2.3% for 1993 and 2.7% for 1994. Hydro-Quebec also has a long-term objective of gradually reducing cross-subsidization that exists among different tariff categories. A slight differentiation of rate increases in the various categories is proposed to reduce this cross-subsidization. The proposed rate increases are expected to bring additional revenues of $152 million for 1993/94 and $186 million for 1994/95. 3 figs., 35 tabs

  17. From concept to construction: a 15 MW small hydro project

    Energy Technology Data Exchange (ETDEWEB)

    Stephens, S.; Neegan, K.

    1995-12-31

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for `Mother Earth` in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project.

  18. From concept to construction: a 15 MW small hydro project

    International Nuclear Information System (INIS)

    Stephens, S.; Neegan, K.

    1995-01-01

    An audio recording of an address by Chief Stanley Stephens and Deputy-Chief Ken Neegan of the Constance Lake First Nation, at the Renewable Energy Commercial Trade Show and Markets Conference was presented. The speech concerned development of a 15 MW hydro project on the reservation. Stephens recalled how initial opposition was overcome by addressing simple misconceptions about the project. The project was initiated by the Ontario Energy Corporation with a series of community discussions which addressed environmental impacts, and benefits that would result from the project. Neegan explained that after deliberation and negotiations, the Constance Lake First Nation was pleased with the project. This project was evidence that sound partnership could be formed between First Nations and hydro developers, while preserving respect for 'Mother Earth' in the process. Trust between the community, the developers and government was considered to be the critical component of the project. Sound legal, technical, environmental and financial information was also indispensable in allowing the Constance Lake First Nation to make its decision to proceed with the project

  19. Scheduling of head-dependent cascaded reservoirs considering discharge ramping constraints and start/stop of units

    Energy Technology Data Exchange (ETDEWEB)

    Catalao, J.P.S.; Pousinho, H.M.I. [Department of Electromechanical Engineering, University of Beira Interior, R. Fonte do Lameiro, 6201-001 Covilha (Portugal); Mendes, V.M.F. [Department of Electrical Engineering and Automation, Instituto Superior de Engenharia de Lisboa, R. Conselheiro Emidio Navarro, 1950-062 Lisbon (Portugal)

    2010-10-15

    This paper is on the problem of short-term hydro scheduling (STHS), particularly concerning head-dependent reservoirs under competitive environment. We propose a novel method, based on mixed-integer nonlinear programming (MINLP), for optimising power generation efficiency. This method considers hydroelectric power generation as a nonlinear function of water discharge and of the head. The main contribution of this paper is that discharge ramping constraints and start/stop of units are also considered, in order to obtain more realistic and feasible results. The proposed method has been applied successfully to solve two case studies based on Portuguese cascaded hydro systems, providing a higher profit at an acceptable computation time in comparison with classical optimisation methods based on mixed-integer linear programming (MILP). (author)

  20. Fluid convection, constraint and causation

    Science.gov (United States)

    Bishop, Robert C.

    2012-01-01

    Complexity—nonlinear dynamics for my purposes in this essay—is rich with metaphysical and epistemological implications but is receiving sustained philosophical analysis only recently. I will explore some of the subtleties of causation and constraint in Rayleigh–Bénard convection as an example of a complex phenomenon, and extract some lessons for further philosophical reflection on top-down constraint and causation particularly with respect to causal foundationalism. PMID:23386955

  1. Hybrid Micro-Hydro Power Generation Development in Endau Rompin National Park Johor, Malaysia

    Directory of Open Access Journals (Sweden)

    Yusop Azli

    2017-01-01

    Full Text Available Micro-Hydro electrical power systems are very useful for remote area electrification which does not had supply from the national grid. On the contrary, this area has river streams with high potential for micro-hydro power generation. As such, the UTHM ECO-Hydro Team embarked on a project for erecting a micro-hydro power plant with collaboration with National Education Research Center (NERC, Johor National Park Corporation in Endau Rompin. The existing power generation in this area at present is by using diesel generator gives negative impact on finance and environment in the long run. It supplies power to several including library, offices, open laboratory, chalets and dorms.. At the moment, the micro-hydro system complements the diesel generator, thus becoming a hybrid power generation system.

  2. Continuation calculus

    Directory of Open Access Journals (Sweden)

    Bram Geron

    2013-09-01

    Full Text Available Programs with control are usually modeled using lambda calculus extended with control operators. Instead of modifying lambda calculus, we consider a different model of computation. We introduce continuation calculus, or CC, a deterministic model of computation that is evaluated using only head reduction, and argue that it is suitable for modeling programs with control. It is demonstrated how to define programs, specify them, and prove them correct. This is shown in detail by presenting in CC a list multiplication program that prematurely returns when it encounters a zero. The correctness proof includes termination of the program. In continuation calculus we can model both call-by-name and call-by-value. In addition, call-by-name functions can be applied to call-by-value results, and conversely.

  3. HydroShare: A Platform for Collaborative Data and Model Sharing in Hydrology

    Science.gov (United States)

    Tarboton, D. G.; Idaszak, R.; Horsburgh, J. S.; Ames, D. P.; Goodall, J. L.; Couch, A.; Hooper, R. P.; Dash, P. K.; Stealey, M.; Yi, H.; Bandaragoda, C.; Castronova, A. M.

    2017-12-01

    HydroShare is an online, collaboration system for sharing of hydrologic data, analytical tools, and models. It supports the sharing of and collaboration around "resources" which are defined by standardized content types for data formats and models commonly used in hydrology. With HydroShare you can: Share your data and models with colleagues; Manage who has access to the content that you share; Share, access, visualize and manipulate a broad set of hydrologic data types and models; Use the web services application programming interface (API) to program automated and client access; Publish data and models and obtain a citable digital object identifier (DOI); Aggregate your resources into collections; Discover and access data and models published by others; Use web apps to visualize, analyze and run models on data in HydroShare. This presentation will describe the functionality and architecture of HydroShare highlighting its use as a virtual environment supporting education and research. HydroShare has components that support: (1) resource storage, (2) resource exploration, and (3) web apps for actions on resources. The HydroShare data discovery, sharing and publishing functions as well as HydroShare web apps provide the capability to analyze data and execute models completely in the cloud (servers remote from the user) overcoming desktop platform limitations. The HydroShare GIS app provides a basic capability to visualize spatial data. The HydroShare JupyterHub Notebook app provides flexible and documentable execution of Python code snippets for analysis and modeling in a way that results can be shared among HydroShare users and groups to support research collaboration and education. We will discuss how these developments can be used to support different types of educational efforts in Hydrology where being completely web based is of value in an educational setting as students can all have access to the same functionality regardless of their computer.

  4. HydroViz: evaluation of a web-based tool for improving hydrology education

    Science.gov (United States)

    Habib, E.; Ma, Y.; Williams, D.; Sharif, H.; Hossain, F.

    2012-02-01

    HydroViz is a web-based, student-centered, highly visual educational tool designed to support active learning in the field of Engineering Hydrology. The development of HydroViz is informed by recent advances in hydrologic data, numerical simulations, visualization and web-based technologies. An evaluation study was conducted to determine the effectiveness of HydroViz, to examine the buy-in of the program, and to identify project components that need to be improved. A total of 182 students from seven freshmen and junior-/senior-level undergraduate classes in three universities participated in the study over the course of two semesters (spring 2010 and fall 2010). Data sources included homework assignments, online surveys, and informal interviews with students. Descriptive statistics were calculated for homework and the survey. Qualitative analysis of students' comments and informal interview notes were also conducted to identify ideas and patterns. HydroViz was effective in facilitating students' learning and understanding of hydrologic concepts and increasing related skills. Students had positive perceptions of various features of HydroViz and they believe that HydroViz fits well in the curriculum. The experience with HydroViz was somewhat effective in raising freshmen civil engineering students' interest in hydrology. In general, HydroViz tend to be more effective with students in junior- or senior-level classes than students in freshmen classes. There does not seem to be obvious differences between different universities. Students identified some issues that can be addressed to improve HydroViz. Future adaptation and expansion studies are under planning to scale-up the application and utility of HydroViz into various hydrology and water-resource engineering curriculum settings.

  5. 77 FR 23241 - Lock+ Hydro Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre...

    Science.gov (United States)

    2012-04-18

    ... Friends Fund XXX, LLC; Notice of Intent To File License Application, Filing of Pre-Application Document.... Date Filed: February 20, 2012. d. Submitted By: Lock+ Hydro Friends Fund XXX, LLC. e. Name of Project... Applicant Contact: Mr. Mark R. Stover, Lock+\\TM\\ Hydro Friends Fund XXX, c/o Hydro Green Energy, LLC, 900...

  6. 78 FR 34092 - Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2013-06-06

    .... 14504-000] Lock+ Hydro Friends Fund XXX, LLC; FFP Project 121, LLC; Notice of Competing Preliminary... Applications Lock+ Hydro Friends Fund XXX, LLC and FFP Project 121, LLC filed preliminary permit applications... regular business day. See id. at 385.2001(a)(2). Lock+ Hydro Friends Fund XXX, LLC's application is for a...

  7. 76 FR 67174 - Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3 Hydroelectric LLC, Lock...

    Science.gov (United States)

    2011-10-31

    ...; 14166-000; 14180-000; 14193-000] Arkansas Electric Cooperative Corp., Riverbank Hydro No. 9 LLC, Solia 3... May 2, 2011, Arkansas Electric Cooperative Corp. (Arkansas Electric), Riverbank Hydro No. 9 LLC.... Krouse, Hydro Green Energy, 5090 Richmond Avenue 390, Houston, TX 77056. (877) 556-6566 x 709. FFP 2's...

  8. 77 FR 73651 - North Star Hydro Services, CA LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2012-12-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14465-000] North Star Hydro..., Motions To Intervene, and Competing Applications On November 6, 2012, North Star Hydro Services CA, LLC.... Applicant Contact: Mr. David Holland, North Star Hydro Services CA, LLC, 1110 West 131st Street South, Jenks...

  9. 77 FR 55212 - North Star Hydro Services CA, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2012-09-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14379-000] North Star Hydro..., Motions To Intervene, and Competing Applications On March 30, 2012, North Star Hydro Services CA, LLC... approximately 3.8 gigawatthours. Applicant Contact: David Holland, North Star Hydro Services CA, LLC, 1110 West...

  10. 78 FR 77118 - KC Small Hydro, LLC; Notice of Amended Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-12-20

    ..., Motions To Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an... 28, 2013, application and sent an acceptance letter to KC Scoby Hydro, LLC. Subsequently, On October 28, 2013, KC Scoby Hydro, LLC, amended its preliminary permit application to change its name to KC...

  11. 78 FR 54643 - KC Scoby Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2013-09-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14526-000] KC Scoby Hydro... Intervene, and Competing Applications On May 28, 2013, KC Scoby Hydro, LLC, filed an application for a... Contact: Kelly Sackheim, KC Scoby Hydro, LLC, 5096 Cocoa Palm Way, Fair Oaks, CA 95628; phone: (301) 401...

  12. Experimental constraints on transport

    International Nuclear Information System (INIS)

    Luce, T.C.; Petty, K.H.; Burrell, K.H.; Forest, C.B.; Gohil, P.; Groebner, R.J.; De Haas, J.C.M.; James, R.A.; Makowski, M.A.

    1994-12-01

    Characterization of the cross-field energy transport in magnetic confinement experiments in a manner applicable to the accurate assessment of future machine performance continues to be a challenging goal. Experimental results from the DIII-D tokamak in the areas of dimensionless scaling and non-diffusive transport represent progress toward this goal. Dimensionless scaling shows how beneficial the increase in machine size and magnetic field is for future devices. The experiments on DIII-D are the first to determine separately the electron and ion scaling with normalized gyroradius ρ * ; the electrons scale as expected from gyro-Bohm class theories, while the ions scale consistent with the Goldston empirical scaling. This result predicts an increase in transport relative to Bohm diffusion as ρ * decreases in future devices. The existence of distinct ρ * scalings for ions and electrons cautions against a physical interpretation of one-fluid or global analysis. The second class of experiments reported here are the first to demonstrate the existence of non-diffusive energy transport. Electron cyclotron heating was applied at the half radius; the electron temperature profile remains substantially peaked. Power balance analysis indicates that heat must flow in the direction of increasing temperature, which is inconsistent with purely diffusive transport. The dynamics of electron temperature perturbations indicate the presence in the heat flux of a term dependent on temperature rather than its gradient. These two observations strongly constrain the types of models which can be applied to cross-field heat transport

  13. Temperature buffer test. Hydro-mechanical and chemical/ mineralogical characterizations

    International Nuclear Information System (INIS)

    Aakesson, Mattias; Olsson, Siv; Dueck, Ann; Nilsson, Ulf; Karnland, Ola; Kiviranta, Leena; Kumpulainen, Sirpa; Linden, Johan

    2012-01-01

    The Temperature Buffer Test (TBT) is a joint project between SKB/ANDRA and supported by ENRESA (modeling) and DBE (instrumentation), which aims at improving the understanding and to model the thermo-hydro-mechanical behavior of buffers made of swelling clay submitted to high temperatures (over 100 deg C) during the water saturation process. The test has been carried out in a KBS-3 deposition hole at Aspo HRL. It was installed during the spring of 2003. Two steel heaters (3 m long, 0.6 m diameter) and two buffer arrangements have been investigated: the lower heater was surrounded by rings of compacted Wyoming bentonite only, whereas the upper heater was surrounded by a composite barrier, with a sand shield between the heater and the bentonite. The test was dismantled and sampled during the winter of 2009/2010. This report presents the hydro-mechanical and chemical/mineralogical characterization program which was launched subsequent to the dismantling operation. The main goal has been to investigate if any significant differences could be observed between material from the field experiment and the reference material. The field samples were mainly taken from Ring 4 (located at the mid-section around the lower heater), in which the temperature in the innermost part reached 155 deg C. The following hydro-mechanical properties have been determined for the material (test technique within brackets): hydraulic conductivity (swelling pressure device), swelling pressure (swelling pressure device), unconfined compression strength (mechanical press), shear strength (triaxial cell) and retention properties (jar method). The following chemical/mineralogical properties (methods within brackets) were determined: anion analysis of water leachates (IC), chemical composition (ICP/AES+MS, EGA), cation exchange capacity (CEC, Cu-trien method) and exchangeable cations (exchange with NH4, ICPAES), mineralogical composition (XRD and FTIR), element distribution and microstructure (SEM and

  14. Optimal portfolio strategies under a shortfall constraint | Akume ...

    African Journals Online (AJOL)

    We impose dynamically, a shortfall constraint in terms of Tail Conditional Expectation on the portfolio selection problem in continuous time, in order to obtain optimal strategies. The nancial market is assumed to comprise n risky assets driven by geometric Brownian motion and one risk-free asset. The method of Lagrange ...

  15. Automatic penalty continuation in structural topology optimization

    DEFF Research Database (Denmark)

    Rojas Labanda, Susana; Stolpe, Mathias

    2015-01-01

    this issue is addressed. We propose an automatic continuation method, where the material penalization parameter is included as a new variable in the problem and a constraint guarantees that the requested penalty is eventually reached. The numerical results suggest that this approach is an appealing...... alternative to continuation methods. Automatic continuation also generally obtains better designs than the classical formulation using a reduced number of iterations....

  16. Developmental constraints on behavioural flexibility.

    Science.gov (United States)

    Holekamp, Kay E; Swanson, Eli M; Van Meter, Page E

    2013-05-19

    We suggest that variation in mammalian behavioural flexibility not accounted for by current socioecological models may be explained in part by developmental constraints. From our own work, we provide examples of constraints affecting variation in behavioural flexibility, not only among individuals, but also among species and higher taxonomic units. We first implicate organizational maternal effects of androgens in shaping individual differences in aggressive behaviour emitted by female spotted hyaenas throughout the lifespan. We then compare carnivores and primates with respect to their locomotor and craniofacial adaptations. We inquire whether antagonistic selection pressures on the skull might impose differential functional constraints on evolvability of skulls and brains in these two orders, thus ultimately affecting behavioural flexibility in each group. We suggest that, even when carnivores and primates would theoretically benefit from the same adaptations with respect to behavioural flexibility, carnivores may nevertheless exhibit less behavioural flexibility than primates because of constraints imposed by past adaptations in the morphology of the limbs and skull. Phylogenetic analysis consistent with this idea suggests greater evolutionary lability in relative brain size within families of primates than carnivores. Thus, consideration of developmental constraints may help elucidate variation in mammalian behavioural flexibility.

  17. Data assimilation with inequality constraints

    Science.gov (United States)

    Thacker, W. C.

    If values of variables in a numerical model are limited to specified ranges, these restrictions should be enforced when data are assimilated. The simplest option is to assimilate without regard for constraints and then to correct any violations without worrying about additional corrections implied by correlated errors. This paper addresses the incorporation of inequality constraints into the standard variational framework of optimal interpolation with emphasis on our limited knowledge of the underlying probability distributions. Simple examples involving only two or three variables are used to illustrate graphically how active constraints can be treated as error-free data when background errors obey a truncated multi-normal distribution. Using Lagrange multipliers, the formalism is expanded to encompass the active constraints. Two algorithms are presented, both relying on a solution ignoring the inequality constraints to discover violations to be enforced. While explicitly enforcing a subset can, via correlations, correct the others, pragmatism based on our poor knowledge of the underlying probability distributions suggests the expedient of enforcing them all explicitly to avoid the computationally expensive task of determining the minimum active set. If additional violations are encountered with these solutions, the process can be repeated. Simple examples are used to illustrate the algorithms and to examine the nature of the corrections implied by correlated errors.

  18. Collaborative Modular Pumped Hydro Energy Storage Design Study

    Energy Technology Data Exchange (ETDEWEB)

    Bibeault, Mark Leonide [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Roybal, Adam [Jemez Mountain Electric Cooperative, Inc., Hernandez, NM (United States); Bailey, Jr., Richard J. [Northern New Mexico College, Espanola, NM (United States)

    2017-09-29

    In May of 2017, Los Alamos National Laboratory (LANL) through the Applied Engineering Technology Division, Jemez Mountain Electric Cooperative Inc. (JMEC), and Northern New Mexico College (NNMC) agreed to enter into a small, joint, non-binding Modular Pumped Hydro (MPH) design study related to grid level energy storage to begin a process of collaboration. Los Alamos National Laboratory's mission is to solve national security challenges through scientific excellence. The mission of Northern New Mexico College is to ensure student success by providing access to affordable, community-based learning opportunities that meet the educational, cultural, and economic needs of the region. Jemez Mountain Electric Cooperative Inc. is the largest electric co-op in the State of New Mexico providing affordable and reliable electricity to customers in the five counties of Rio Arriba, Santa Fe, San Juan, McKinley and Sandoval.

  19. Developments in steam generator leak detection at Ontario Hydro

    Energy Technology Data Exchange (ETDEWEB)

    Maynard, K.J.; Singh, V.P. [Ontario Hydro Technologies, Toronto, Ontario (Canada)

    1998-07-01

    A method for locating small tube leaks in steam generators has been developed and implemented at Ontario Hydro. The technique utilizes both helium leak detection and moisture leak detection. The combination of these two methods allows tube leaks to be detected in any part of the tube bundle, including those submerged below water near the tubesheet. The estimated detection limits for the helium and moisture leak detection systems are 0.001 kg/hr and 0.05 kg/hr respectively, expressed as leak rates measured at typical boiler operating conditions. This technology is best utilized in situations where the leak rate under operating conditions is smaller than the practical limit for fluorescein dye techniques ({approx}2 kg/hour). Other novel techniques have been utilized to increase the reliability and speed of the boiler leak search process. These include the use of argon carrier gas to stabilize the buoyant helium gas in the boiler secondary. (author)

  20. Developments in steam generator leak detection at Ontario Hydro

    International Nuclear Information System (INIS)

    Maynard, K.J.; Singh, V.P.

    1998-01-01

    A method for locating small tube leaks in steam generators has been developed and implemented at Ontario Hydro. The technique utilizes both helium leak detection and moisture leak detection. The combination of these two methods allows tube leaks to be detected in any part of the tube bundle, including those submerged below water near the tubesheet. The estimated detection limits for the helium and moisture leak detection systems are 0.001 kg/hr and 0.05 kg/hr respectively, expressed as leak rates measured at typical boiler operating conditions. This technology is best utilized in situations where the leak rate under operating conditions is smaller than the practical limit for fluorescein dye techniques (∼2 kg/hour). Other novel techniques have been utilized to increase the reliability and speed of the boiler leak search process. These include the use of argon carrier gas to stabilize the buoyant helium gas in the boiler secondary. (author)

  1. Tilting-Pad Guide Bearing in Large Hydro-unit

    Directory of Open Access Journals (Sweden)

    Li-Feng Ma

    2000-01-01

    Full Text Available A new numerical method is proposed for predicting the nonlinearity of tilting-pad guide bearing oilfilm force in the rotor-bearing system in a large hydro-unit. Nonlinear displacement and velocity of the journal center, as well as nonlinear tilting angles and angular velocities of the pads in non-stationary Reynolds equation are taken into account. This method is also suited for other small rotor-bearing system. As an example, the response due to a momentarily created unbalance is Calculated. The nonlinear motion patterns of the pad and journal whirling orbit are obtained. Finally, the nonlinear orbit is compared to the linear one that could be calculated from linear stiffness and damping coefficients. It is shown that there are important differences between those two orbits and that the nonlinear simulation is more accurate.

  2. Energy balance of hydro-aggregate with Pelton water turbine

    International Nuclear Information System (INIS)

    Obretenov, V.

    2005-01-01

    One of the major tasks in the field of hydraulic power engineering refers to machines and equipment modernization in the hydropower plants and pumped storage power plants commissioned more than 20 years ago. The increase of hydraulic units operation efficiency will allow in a number of cases to substantially reduce the specific water consumption and to drive the output of electric energy up. In these cases it is crucial to find out the operational efficiency of individual system elements and to precisely focus the modernization endeavours on such elements where the energy losses go beyond all admissible limits. Besides, the determination of the energy losses in the hydro energy turbo system will allow valid defining of hydraulic units operational scope. This work treats the methods of balance study of a hydraulic unit with Peiton water turbine. The experimental results of the balance study of Belmeken pumped storage power plant hydraulic unit No 5 under turbine operational mode are presented

  3. Hydrological characteristics and problems of Calma hydro accumulation system

    Directory of Open Access Journals (Sweden)

    Dolinaj Dragan

    2008-01-01

    Full Text Available Srem, as traditional farming, orchard and wine-growing region, faces the problem of shortage of water needed for agriculture. During the seventies of the last century brook valleys in the southern part of Fruska Gora loess plateau were intended to be dammed. Thus, artificial lakes could have been formed. It took long period of time to put these projects into practice and numerous projects have not started yet. After the dams had been built and lakes filled with water, planners faced hydro-geological problems at many locations. Nevertheless, these accumulations fulfill their primary function, i.e. they ensure water for irrigation and protect agricultural land from floods. There is a hydroaccumulation system, Calma lakes, near the village of Calma. Its primary function was to ensure water supplies for agriculture, but eventually it got new significance which can be noticed in fish raising and sport fishing development.

  4. Accurate green water loads calculation using naval hydro pack

    Science.gov (United States)

    Jasak, H.; Gatin, I.; Vukčević, V.

    2017-12-01

    An extensive verification and validation of Finite Volume based CFD software Naval Hydro based on foam-extend is presented in this paper for green water loads. Two-phase numerical model with advanced methods for treating the free surface is employed. Pressure loads on horizontal deck of Floating Production Storage and Offloading vessel (FPSO) model are compared to experimental results from [1] for three incident regular waves. Pressure peaks and integrals of pressure in time are measured on ten different locations on deck for each case. Pressure peaks and integrals are evaluated as average values among the measured incident wave periods, where periodic uncertainty is assessed for both numerical and experimental results. Spatial and temporal discretization refinement study is performed providing numerical discretization uncertainties.

  5. Hydro-Quebec's survey on outage cost in industries

    International Nuclear Information System (INIS)

    Naggar, R.

    1990-01-01

    In 1989 Hydro-Quebec completed a survey on the cost of power interruptions to its industrial customers. A total of 11,000 firms formed the base of the survey, which was reduced to 1,647 for analysis purposes. The questionnaire was designed around the concept of representation of knowledge. The costs of various situations were inferred for every enterprise on the basis of knowledge obtained through the surveys. The results of the survey describe the variation in costs of interruption as a function of time of occurrence, duration and advance notice. These costs are expressed in terms of a reference case by the equivalent hourly cost. The magnitude of the cost of the reference interruption is designated the reference cost of undelivered energy. This paper describes the methodology of the survey but does not include survey results. 4 refs., 2 tabs

  6. Global analysis of a renewable micro hydro power generation plant

    Science.gov (United States)

    Rahman, Md. Shad; Nabil, Imtiaz Muhammed; Alam, M. Mahbubul

    2017-12-01

    Hydroelectric power or Hydropower means the power generated by the help of flowing water with force. It is one the best source of renewable energy in the world. Water evaporates from the earth's surface, forms clouds, precipitates back to earth, and flows toward the ocean. Hydropower is considered a renewable energy resource because it uses the earth's water cycle to generate electricity. As far as Global is concerned, only a small fraction of electricity is generated by hydro-power. The aim of our analysis is to demonstrate and observe the hydropower of the Globe in micro-scale by our experimental setup which is completely new in concept. This paper consists of all the Global and National Scenario of Hydropower. And how we can more emphasize the generation of Hydroelectric power worldwide.

  7. Secured electrical supply at least cost: Coal, gas, nuclear, hydro

    Energy Technology Data Exchange (ETDEWEB)

    Gavor, J. [ENA Ltd., Prague (Czechoslovakia); Stary, O.; Vasicek, J. [Czech Technical Univ., Prague (Czechoslovakia)

    1995-12-01

    Electric power sector in East Central European countries finds in a difficult period. In the situation of demand stagnation, enormous investments must be realized in a very short time. Today`s decisions in the development strategy will influence the long term future of the industry. The optimal structure of the sources is one of the most important problem to be solved. Paper describes the current structure of the sources in electric power sector in the Czech Republic. The importance of coal, oil and gas, nuclear and hydro in electric power generation is compared. Taking into account the different position in the load coverage, economy of individual sources is evaluated and basic results of discounted cash flow calculations are presented. Information on specific investment programs and projects are included and further trends are estimated.

  8. Web services for distributed and interoperable hydro-information systems

    Science.gov (United States)

    Horak, J.; Orlik, A.; Stromsky, J.

    2008-03-01

    Web services support the integration and interoperability of Web-based applications and enable machine-to-machine interaction. The concepts of web services and open distributed architecture were applied to the development of T-DSS, the prototype customised for web based hydro-information systems. T-DSS provides mapping services, database related services and access to remote components, with special emphasis placed on the output flexibility (e.g. multilingualism), where SOAP web services are mainly used for communication. The remote components are represented above all by remote data and mapping services (e.g. meteorological predictions), modelling and analytical systems (currently HEC-HMS, MODFLOW and additional utilities), which support decision making in water management.

  9. Naturalization of landscaped parkland at Ontario Hydro's Nanticoke generating station

    International Nuclear Information System (INIS)

    McKenna, G.R.

    1998-01-01

    The implementation of a program for the naturalization of Nanticoke Park, a 30 hectare area located on the property of Ontario Hydro's Nanticoke Generating Station was discussed. The station, which is located in southern Ontario very near to noted wildlife areas, is the largest coal-fired generating station in North America. Naturalization of Nanticoke Park began with passive naturalization of interior areas. An active naturalization program involving four to five hectare size areas annually was begun in 1997, to be completed over a five -year period. This presentation described the site preparation, planting methods, post-planting tending methods, survival assessment of planted areas, and scientific research initiatives including mulch trials with zebra mussel shells to increase soil moisture. The lessons learned from the two year experiment in determining the optimum planting strategy and methods were described. 7 refs., 1 tab

  10. Alternative surfacing materials for weed control at BC Hydro substations

    International Nuclear Information System (INIS)

    Wells, T.C.; Shrimpton, G.M.

    1997-01-01

    A two year study was conducted by BC Hydro in which a variety of surfacing materials were tested for their suitability for use in substations. Ideally, surfacing materials should have the following characteristics: high electrical resistivity in both dry and wet conditions, resistance to invasion by weeds, good driveability, good drainage, non-flammable, reasonably priced, no dust to foul conductors, and be aesthetically pleasing. Trials at Vernon Koksilah, and Ingledow substations were conducted to test the materials. A qualitative estimate of the amount of weed control provided by each material was recorded. The trials were meant to provide operational recommendations and screening information to allow for future testing of promising materials or combination of materials. Results showed that no single material meets all the desired criteria. The surfaces that best combined good weed control, electrical resistance and surface stability was a 15 cm deep layer of crushed gravel, especially if underlain by a layer of geotextile. 4 refs., 3 tabs., 1 fig

  11. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    Energy Technology Data Exchange (ETDEWEB)

    Druce, D. [British Columbia Hydro, Vancouver, BC (Canada)

    2004-07-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs.

  12. A study on the hydrotreating of coal hydro liquefaction residue and its kinetics

    Energy Technology Data Exchange (ETDEWEB)

    Huang, J.; Lu, X.; Zhang, D.; Gao, J. [Department of Chemical Engineering for Energy Resources, East China University of Science and Technology, Shanghai (China)

    2010-09-15

    Hydro-conversion of coal hydro liquefaction residue obtained from a 6 t/day pilot plant of Shenhua Group in Shanghai was carried out under the hydrotreating condition. The coal hydro liquefaction residue and its product were extracted in sequence with n-hexane, toluene and tetrahydrofuran in a Soxhlet apparatus. The n-hexane soluble fractions increased with the increase of reaction temperature and time. Its amount increased from 14.14% to a maximum of 40.86% under the conditions of 470 {sup o}C and 30 min, which meant that moderate extension of coal residence time in the coal hydro liquefaction reactor is beneficial to the increase of oil yield. A 4-lumped kinetic model of coal hydro liquefaction residue hydro-conversion was performed using solubility-based lumped fractions. In the model, the tetrahydrofuran insoluble fractions were classified into two parts: easily reactive part and unreactive part. The kinetic parameters were estimated by a fourth-order Runge-Kutta method and a nonlinear least squares method, and the apparent activation energies were calculated according to the Arrhenius Equation. A large quantity of total catalyst consisting of remained liquefaction catalyst, part of the mineral from raw coal and additive Fe-based catalyst could considerably reduce the apparent activation energy of hydro-conversion for the toluene insoluble/tetrahydrofuran insoluble fractions to 36.79 kJ-mol{sup -1}. The calculated values of the model coincided well with the experimental values. (authors)

  13. Stochastic dynamic programming optimization of BC Hydro's system under market and hydrologic uncertainties

    International Nuclear Information System (INIS)

    Druce, D.

    2004-01-01

    BC Hydro's installed generation capacity as of March 31, 2003 was 11,103 MW, of which 90 per cent was hydro power, 9 per cent was gas-fired and 1 per cent was non-integrated. The hydroelectric plants belong to one of three groups, the Peace River, Columbia River or small hydro which includes small to moderate sized-plants. Small hydro is controlled by hydrologic regime and storage limitations rather than by system requirements. The installed capacity for the 4 plants on the Columbia River totals 4,722 MW. The installed capacity at the 2 plants on the Peace River totals 3,424 MW. Both watersheds are subject to interior climate conditions with significant inflows from snowmelt and rainfall runoff. This presentation addressed the issue of mid-term hydro scheduling and its impact on markets. For the past 15 years, BC Hydro has used the marginal cost model for electricity trade and for operations planning. The model considers system loads and resources, and maximizes the expected net revenue over a planning horizon of 6 years. A marginal value of water stored in the Williston Reservoir has been established using the marginal cost model. The affect of weather, natural gas prices and water supply on hydro generation was also discussed. It was noted that information on spot market electricity prices has significantly improved since the electric power industry was deregulated in 1996. tabs., figs

  14. Hydro Tasmania - renewable energy drivers, action and plans

    International Nuclear Information System (INIS)

    Gill, R.; Andrews, H.

    2005-01-01

    In Tasmania, the island state of Australia, the generator, Hydro Tasmania, is pushing technical, environmental and business boundaries in its plans to integrate a relatively high proportion (up to 20 percent) of large wind generators into its current complex mix of large and small hydropower plants. Its plans include projects to increase the efficiency of its older hydropower equipment as it prepares to supply much needed peaking capacity to the market in southern Australia via the groundbreaking Basslink undersea cable, which is due for completion in November 2005. Taken as a package these developments are creating a globally significant reference site for renewable energy systems. The paper will describe what is happening, and more importantly what is underpinning the developments, including: the harnessing of Tasmania's world-class wind resource, where recently constructed 1.75 MW wind turbines are achieving capacity factors of over 45 percent - some of the best productivity in the world today; the application of leading environmental science measures to ensure the sustainability of both the new wind farm developments and the transformation of the hydropower system to meet peak capacity demands; the relevance of the existing large hydropower storages that can operate in synergy with the wind resource; the contribution of Australia's renewable energy certificate scheme, which is effectively doubling the value of new renewable energy developments compared with existing generation sources; the application of the latest technology in hydropower turbines, combined with power system expertise from the world's leading manufacturers, to increase the efficiency of older hydropower generators, thereby more effectively harnessing the existing environmental footprint; and the transformation of Hydro Tasmania's business into a significant supplier and trader of premium value peak energy into the sophisticated Australian National Electricity Market. (author)

  15. HydroClimATe: hydrologic and climatic analysis toolkit

    Science.gov (United States)

    Dickinson, Jesse; Hanson, Randall T.; Predmore, Steven K.

    2014-01-01

    The potential consequences of climate variability and climate change have been identified as major issues for the sustainability and availability of the worldwide water resources. Unlike global climate change, climate variability represents deviations from the long-term state of the climate over periods of a few years to several decades. Currently, rich hydrologic time-series data are available, but the combination of data preparation and statistical methods developed by the U.S. Geological Survey as part of the Groundwater Resources Program is relatively unavailable to hydrologists and engineers who could benefit from estimates of climate variability and its effects on periodic recharge and water-resource availability. This report documents HydroClimATe, a computer program for assessing the relations between variable climatic and hydrologic time-series data. HydroClimATe was developed for a Windows operating system. The software includes statistical tools for (1) time-series preprocessing, (2) spectral analysis, (3) spatial and temporal analysis, (4) correlation analysis, and (5) projections. The time-series preprocessing tools include spline fitting, standardization using a normal or gamma distribution, and transformation by a cumulative departure. The spectral analysis tools include discrete Fourier transform, maximum entropy method, and singular spectrum analysis. The spatial and temporal analysis tool is empirical orthogonal function analysis. The correlation analysis tools are linear regression and lag correlation. The projection tools include autoregressive time-series modeling and generation of many realizations. These tools are demonstrated in four examples that use stream-flow discharge data, groundwater-level records, gridded time series of precipitation data, and the Multivariate ENSO Index.

  16. Manitoba Hydro's earth power program and Manitoba market update

    International Nuclear Information System (INIS)

    Pearson, K.

    2005-01-01

    An outline of Manitoba Hydro's Earth Power program was presented. Details of the heat pump market in Manitoba were provided, including details of residential and commercial sales. Total residential heat pump sales amounted to 577 units in 2004, equivalent to over $11.2 million in sales. Commercial installations amounted to approximately $12.7 million. An outline of industry players was presented. The goals of Manitoba Hydro were outlined in relation to geothermal energy and the Power Smart program. Their objectives included increasing awareness of geothermal energy, making heat pumps more accessible, and improving industry infrastructure. Other objectives included educating the public about life-cycle cost implications, residential loans and commercial incentives. To date, the residential power loan has provided financing to over 300 Manitoba home owners for installations, with electrical savings of over 1.34 Gwh and natural gas savings of 279,425 m 3 . The program is also committed to providing assistance with feasibility studies. Provincial tax credits for the Earth Program included a 10 per cent deduction of geothermal heat pump purchases from corporation income tax. Case studies of the program were presented along with an outline of the geothermal heat pump for homes booklet. Details of the residential earth power loan were provided, including details of installation, system completion and approval processes. Awards and accolades for the program include the 2004 HRAI Education supporter award and recognition by the David Suzuki Foundation, which highlighted the program as a national leader in encouraging and facilitating the use of GeoExchange technology. tabs, figs

  17. Hydro-MRI for abdominal diagnostics in children

    International Nuclear Information System (INIS)

    Kern, A.; Schunk, K.; Oberholzer, K.; Thelen, M.; Kessler, M.

    2001-01-01

    A clinical evaluation of hydro-MRI as an alternative method to barium studies in children with abdominal pain of unknown origin is presented. Patients and Methods: 20 children with abdominal pain of unknown origin aged from 9 - 16 years were examined after oral bowel opacification using 1000 ml of 2.5% mannitol solution with a 1.0T MRI system. The investigation was done in 2 planes (coronal and axial) under breath-hold conditions. Imaging procedures included various sequences (T2W HASTE + FS, contrast-enhanced T1W FLASH FS). Suspicious findings in bowel segments and extra-intestinal changes were assessed. Results: In 21/24 examinations the small bowel was completely visualized, in 15/24 cases colon segments were identified. An accurate assessment of the terminal ileum was not possible in 3/24 procedures. Breathing artefacts occurred in 3/24 examinations. Signs of Crohn's disease were found in 4 examinations, inflammatory changes of the ileum were detected in 3 cases. Inflammation of the colon was demonstrated in 2 children. Furthermore, pathological findings included constipation in one child and inflammation of the ileo-colic and mesenterial lymph nodes were found in another child. Extra-intestinal changes in 3 children were caused by ovarian cysts, and in one case by pleural effusion. In 4 examinations we detected ascites in the absence of other pathological findings. In 5 children there was no pathological correlation in the bowel or extra-intestinal region for the complaints. The children tolerated the hydro-MRI very well. There were no side effects using oral mannitol. (orig.) [de

  18. Hydro-Quebec 2004 annual report : growing strong

    International Nuclear Information System (INIS)

    2005-01-01

    This report provides a consolidated review of the operations of Hydro-Quebec, with a focus on energy production, energy sales, and environmental commitment. Hydro-Quebec is a major producer, transmission provider and distributor of electricity, conducting research and promotional activities in energy and energy transformation and conservation. The Quebec government is its sole shareholder. The company is divided into six divisions and now competes freely with other power producers, while its transmission and distribution remain regulated. Sales totalled $10.7 billion, up 1.8 per cent over 2003. Net income rose to $2.4 billion, up $497 million over 2003, the increase being largely due to lower financial expenses and the disposal of interests in Noverco. Dividends declared amounted to $1.3 billion, or 55 per cent of net income. Cash from operations totaled $4.0 billion, Sources of revenue also included the sale of interests in Noverco, and investment in Meiya Power Company, with the consequent repayment of nearly $1 billion in debt. Major projects of 2004 included the start of operations at the Rocher-de-Grand-Mere generating station as well as work proceeding on Eastmain-1, Peribonka, Toulnustouc and Mercier. Other projects included a partnership with the Crees of Eeyou and the filing of the Energy Efficiency Plan 2005-2010. This annual report presented the company's financial performance, executive changes and reorganization. Financial statements included a review and analysis of financial transactions, the auditor's report as well as customary notes to the consolidated financial statement including balance sheets, assets, liabilities and capital. tabs., figs

  19. Constraint programming and decision making

    CERN Document Server

    Kreinovich, Vladik

    2014-01-01

    In many application areas, it is necessary to make effective decisions under constraints. Several area-specific techniques are known for such decision problems; however, because these techniques are area-specific, it is not easy to apply each technique to other applications areas. Cross-fertilization between different application areas is one of the main objectives of the annual International Workshops on Constraint Programming and Decision Making. Those workshops, held in the US (El Paso, Texas), in Europe (Lyon, France), and in Asia (Novosibirsk, Russia), from 2008 to 2012, have attracted researchers and practitioners from all over the world. This volume presents extended versions of selected papers from those workshops. These papers deal with all stages of decision making under constraints: (1) formulating the problem of multi-criteria decision making in precise terms, (2) determining when the corresponding decision problem is algorithmically solvable; (3) finding the corresponding algorithms, and making...

  20. Micro-hydro power in the UK: The role of communities in an emerging energy resource

    International Nuclear Information System (INIS)

    Bracken, L.J.; Bulkeley, H.A.; Maynard, C.M.

    2014-01-01

    Research around micro-hydro power is focused on technical aspects with limited understanding of the social organisation and environmental implications. We examine the ways in which micro-hydro is engaged by people and organisations as a means of contributing to the UK's policy ambition for renewable energy. We bring to the fore the way in which expertise is used and contested. A web based review of micro-hydro schemes in the UK was undertaken and a detailed evaluation of two schemes in the North of England was conducted to determine how expertise and contestation figures in community schemes. Results demonstrate a rapid expansion of micro-hydro in the UK. Ownership/control is highly ‘community based’. Until now research around micro-hydro has been dominated by technical approaches with schemes defined in terms of hardware. We propose a third dimension to Walker and Cass's (2007) classification of renewable energy developments: the environmental dimension. We suggest this dimension of micro-hydro is critical, both in terms of the extent to which resources can be realised but also the ways in which it might attract controversy, in particular around how expertise is used and valued. - Highlights: • Analysis of micro-hydro schemes in the UK demonstrates a recent rapid expansion. • We propose a third dimension to renewable energy developments: the environmental dimension. • The environmental dimension of micro-hydro determines how resources are realised. • Environmental features underpin the controversy which can emerge around schemes. • The ownership of micro-hydro schemes is highly ‘community based’