WorldWideScience

Sample records for hungry horse hydroelectric

  1. Wildlife Loss Estimates and Summary of Previous Mitigation Related to Hydroelectric Projects in Montana, Volume Three, Hungry Horse Project.

    Energy Technology Data Exchange (ETDEWEB)

    Casey, Daniel

    1984-10-01

    This assessment addresses the impacts to the wildlife populations and wildlife habitats due to the Hungry Horse Dam project on the South Fork of the Flathead River and previous mitigation of theses losses. In order to develop and focus mitigation efforts, it was first necessary to estimate wildlife and wildlife hatitat losses attributable to the construction and operation of the project. The purpose of this report was to document the best available information concerning the degree of impacts to target wildlife species. Indirect benefits to wildlife species not listed will be identified during the development of alternative mitigation measures. Wildlife species incurring positive impacts attributable to the project were identified.

  2. Hungry Horse mitigation: Aquatic modeling of the selective withdrawal system -- Hungry Horse Dam, Montana

    International Nuclear Information System (INIS)

    Marotz, B.L.; Althen, C.; Gustafson, D.

    1994-04-01

    Hungry Horse Dam presently releases frigid water from the bottom of the reservoir all year long. Cold water effects insect production and fish growth downstream. Rapid temperature changes of up to 8.3 C (14 F) have been measured in the Flathead River downstream of the South Fork confluence, controlled by dam discharges. Thermal effects from Hungry Horse Dam are detectable for over 64 Km downstream to Flathead Lake. The installation of a selective withdrawal structure on each of the dam's discharge penstocks was determined to be the most cost-effective means to provide constant, permanent temperature control without impacting power production and flexibility in dam operation. The thermal model presented herein revealed that fish growth potential in the river would increase two to five times through selective withdrawal, temperature control. Temperature control is possible over the entire range of turbine discharge capacity, with very little effect on power production. Findings indicate that angling would improve through higher catch rates and larger fish. Temperature control will solve the most serious impact to river health. However, flow fluctuations will continue to effect insect production and usable fishery habitat in the Flathead River. A natural thermal regime combined with moderated flow fluctuation would further enhance riverine food production, trout growth and recreation potential

  3. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2008.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2009-08-06

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  4. Hungry Horse Mitigation : Flathead Lake : Annual Progress Report 2007.

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Barry; Evarts, Les [Confederated Salish and Kootenai Tribes

    2008-12-22

    The Confederated Salish and Kootenai Tribes (CSKT) and Montana Fish Wildlife and Parks (MFWP) wrote the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' in March 1991 to define the fisheries losses, mitigation alternatives and recommendations to protect, mitigate and enhance resident fish and aquatic habitat affected by Hungry Horse Dam. On November 12, 1991, the Northwest Power Planning Council (NPPC) approved the mitigation plan with minor modifications, called for a detailed implementation plan, and amended measures 903(h)(1) through (7). A long-term mitigation plan was submitted in August 1992, was approved by the Council in 1993, and the first contract for this project was signed on November 11, 1993. The problem this project addresses is the loss of habitat, both in quality and quantity, in the Flathead Lake and River basin resulting from the construction and operation of Hungry Horse Dam. The purpose of the project is to both implement mitigation measures and monitor the biological responses to those measures including those implemented by Project Numbers 9101903 and 9101904. Goals and objectives of the 1994 Fish and Wildlife Program (Section 10.1) addressed by this project are the rebuilding to sustainable levels weak, but recoverable, native populations injured by the hydropower system. The project mitigates the blockage of spawning runs by Hungry Horse Dam by restoring and even creating spawning habitats within direct drainages to Flathead Lake. The project also addresses the altered habitat within Flathead Lake resulting from species shifts and consequent dominance of new species that restricts the potential success of mitigation measures. Specific goals of this project are to create and restore habitat and quantitatively monitor changes in fish populations to verify the efficacy of our mitigation measures. The project consists of three components: monitoring, restoration and research

  5. Hungry Horse Dam Fisheries Mitigation Implementation Plan, 1990-2003 Progress (Annual) Report.

    Energy Technology Data Exchange (ETDEWEB)

    Montana Department of Fish, Wildlife and Parks; Confederated Salish and Kootenai Tribes

    1993-03-10

    In this document the authors present mitigation implementation activities to protect and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan only addresses non-operational actions (mitigation measures that do not affect dam operation) described in the 'Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam' (Mitigation Plan) submitted to the Northwest Power Planning Council (Council) in March 1991 and in accordance with subsequent Council action on that Mitigation Plan. Operational mitigation was deferred for consideration under the Columbia Basin System Operation Review (SOR) process. This document represents an implementation plan considered and conditionally approved by the Council in March of 1993.

  6. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  7. Quantification of Hungry Horse Reservoir Water Levels Needed to Maintain or Enhance Reservoir Fisheries; Methods and Data, 1983-1987 Summary Report.

    Energy Technology Data Exchange (ETDEWEB)

    May, Bruce; Michael, Gary; Wachsmuth, John (Montana Department of Fish, Wildlife and Parks, Kalispell, MT)

    1988-06-01

    The Hungry Horse Reservoir study is part of the Northwest Power Planning Council's resident fish and wildlife plan. The plan is responsible for mitigating damages to the fish and wildlife resources caused by hydroelectric development in the Columbia River Basin. The major goal of our study is to quantify seasonal water levels needed to maintain or enhance the reservoir fishery. This study began in May, 1983, and the initial phase will be completed July, 1988. This report summarizes limnological, fish abundance, fish distribution and fish food habits data collected from 1983 to 1988. The effect of reservoir operation upon fish habitat, fish food organisms and fish growth is discussed. 71 refs., 36 figs., 46 tabs.

  8. Environmental assessment and finding of no significant impact: Hungry Horse--Columbia Falls line rebuild and relocation project

    International Nuclear Information System (INIS)

    1993-09-01

    Bonneville Power Administration (BPA) has identified a need to rebuild the Hungry Horse-Columbia Falls 115,000-volt (115-kV) transmission line to 230-kV. This line supplies power to customers in the area of Columbia Falls, Montana, and integrates generation at the US Bureau of Reclamation's (USBR) Hungry Horse Dam into BPA's transmission grid. There are several problems with the existing system. The Hungry Horse-Columbia Falls 1 15-kV line is 45 years old and requires excessive maintenance. The USBR has decided to replace their aging 115-kV transformers at the dam with 230-kV transformers, which also would increase their operational flexibility. With the small conductor size and voltage of the line presently being used, significant amounts of energy are lost as the power moves across the line. Transformer failure at Hungry Horse Dam has led to joint planning between BPA and the USBR. (USBR and the US Forest Service are cooperating agencies on the proposed project.) The proposal to eliminate the 115-kV equipment and convert to 230-kV operation was the least costly of the options studied. By rebuilding the line, maintenance costs (and time required for outages) would be reduced. The increased generation at the USBR dam would be safely and consistently transmitted over the improved system, and less energy would be lost from the line, a cost and energy savings

  9. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1983 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1983-11-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This annual report covers the 1982-1983 field season concerning the effects of Hungry Horse operations on kokanee abundance, migration, spawning, egg incubation and fry emergence in the Flathead River system. This report also addresses the expected recovery of the mainstem kokanee population under the flow regime recommended by the Department of Fish, Wildlife and Parks in 1982.

  10. Libby/Hungry Horse Dams Wildlife Mitigation Habitat Protection : Interim Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1991-04-01

    The Columbia River Basin Fish and Wildlife Program identified mitigation goals for Hungry Horse and Libby dams (1987). Specific programs goals included: (1) protect and/or enhance 4565 acres of wetland habitat in the Flathead Valley; (2) protect 2462 acres of prairie habitat within the vicinity of the Tobacco Plains Columbian sharp-tailed grouse; (3) protect 8590 acres riparian habitat in northwest Montana for grizzly and black bears; and (4) protect 11,500 acres of terrestrial furbearer habitat through cooperative agreements with state and federal agencies and private landowners. The purpose of this project is to continue to develop and obtain information necessary to evaluate and implement specific wildlife habitat protection actions in northwestern Montana. This report summarizes project work completed between May 1, 1990, and December 31, 1990. There were three primary project objectives during this time: obtain specific information necessary to develop the mitigation program for Columbian sharp-tailed grouse; continue efforts necessary to develop, refine, and coordinate the mitigation programs for waterfowl/wetlands and grizzly/black bears; determine the opportunity and appropriate strategies for protecting terrestrial furbearer habitat by lease or management agreements on state, federal and private lands. 19 refs., 1 tab.

  11. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproductive Success of Kokanee in the Flathead System; Technical Addendum to the Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Tohtz, Joel

    1990-03-01

    This addendum to the Final Report presents results of research on the zooplankton and fish communities of Flathead Lade. The intent of the Study has been to identify the impacts of hydroelectric operations at Kerr and Hungry Horse Dam on the reproductive success of kokanee an to propose mitigation for these impacts. Recent changes in the trophic ecology of the lake, have reduced the survival of kokanee. In the last three year the Study has been redirected to identify, if possible, the biological mechanisms which now limit kokanee survival, and to test methods of enhancing the kokanee fishery by artificial supplementation. These studies were necessary to the formulation of mitigation plans. The possibility of successfully rehabilitating the kokanee population, is the doubt because of change in the trophic ecology of the system. This report first presents the results of studies of the population dynamics of crustacean zooplankton, upon which planktivorous fish depend. A modest effort was directed to measuring the spawning escapement of kokanee in 1988. Because of its relevance to the study, we also report assessments of 1989 kokanee spawning escapement. Hydroacoustic assessment of the abundance of all fish species in Flathead Lake was conducted in November, 1988. Summary of the continued efforts to document the growth rates and food habits of kokanee and lake whitefish are included in this report. Revised kokanee spawning and harvest estimates, and management implications of the altered ecology of Flathead Lake comprise the final sections of this addendum. 83 refs., 20 figs., 25 tabs.

  12. Hungry Horse Dam fisheries mitigation program: Fish passage and habitat improvement in the Upper Flathead River basin

    International Nuclear Information System (INIS)

    Knotek, W.L.; Deleray, M.; Marotz, B.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery of fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects

  13. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproductive Success of Kokanee in the Flathead System, 1987 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Zubik, Raymond; Clancey, Patrick

    1988-05-01

    Studies of kokanee reproductive success in the Flathead system from 1981 to 1987 have assessed the losses in fish production attributable to hydroelectric operations. We estimated that the Flathead Lake shoreline spawning stock has lost at least 50,000 fish annually, since Kerr Dam was completed in 1938. The Flathead River spawning stock has lost 95,000 spawners annually because of the operations of Hungry Horse Dam. Lakeshore spawning has been adversely affected because Flathead Lake has been drafted to minimum pool during the winter when kokanee eggs are incubating in shallow shoreline redds. Egg mortality from exposure and desiccation of kokanee redds has increased since the mid 1970's. When the lake was drafted more quickly and held longer at minimum pool. Escapement surveys in the early 1950's, and a creel survey in the early 1960's have provided a baseline to which the present escapement levels can be compared, and loss estimated. Main stem Flathead River spawning has also declined since the mid 1970's when fluctuating discharge from Hungry Horse Dam during the spawning and incubation season exposed redds at the river margin and increased mortality. This decline followed an increase in main stem spawning in the late 1950's through the mid 1960's attributable to higher winter water temperature and relatively stable discharge from Hungry Horse Dam. Spawning escapement in the main stem exceeded 300,000 kokanee in the early 1970's as a result. Spawning in spring-influenced sites has comprised 35 percent of the main stem escapement from 1979 to 1986. We took that proportion of the early 1970's escapement (105,000) as the baseline against which to measure historic loss. Agricultural and suburban development has contributed less significantly to degradation of kokanee spawning habitat in the river system and on the Flathead Lake shoreline. Their influence on groundwater quality and substrate composition has limited

  14. Model Development to Establish Integrated Operational Rule Curves for Hungry Horse and Libby Reservoirs - Montana, 1996 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Marotz, Brian; Althen, Craig; Gustafson, Daniel

    1996-01-01

    Hungry Horse and Libby dams have profoundly affected the aquatic ecosystems in two major tributaries of the Columbia River by altering habitat and water quality, and by imposing barriers to fish migration. In 1980, the U.S. Congress passed the Pacific Northwest Electric Power Planning and Conservation Act, designed in part to balance hydropower development with other natural resources in the Columbia System. The Act formed the Northwest Power Planning Council (Council) who developed a program to protect, mitigate and enhance fish and wildlife on the Columbia River and its tributaries. Pursuant to the Council`s Fish and Wildlife Program for the Columbia River System (1987), we constructed computer models to simulate the trophic dynamics of the reservoir biota as related to dam operation. Results were used to develop strategies to minimize impacts and enhance the reservoir and riverine fisheries, following program measures 903(a)(1-4) and 903(b)(1-5). Two FORTRAN simulation models were developed for Hungry Horse and Libby reservoirs located in northwestern Montana. The models were designed to generate accurate, short-term predictions specific to two reservoirs and are not directly applicable to other waters. The modeling strategy, however, is portable to other reservoir systems where sufficient data are available. Reservoir operation guidelines were developed to balance fisheries concerns in the headwaters with anadromous species recovery actions in the lower Columbia (Biological Rule Curves). These BRCs were then integrated with power production and flood control to reduce the economic impact of basin-wide fisheries recovery actions. These Integrated Rule Curves (IRCs) were developed simultaneously in the Columbia Basin System Operation Review (SOR), the Council`s phase IV amendment process and recovery actions associated with endangered Columbia Basin fish species.

  15. Hungry Horse Dam Fisheries Mitigation : Fish Passage and Habitat Improvement in the Upper Flathead River Basin, 1991-1996 Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Knotek, W.Ladd; Deleray, Mark; Marotz, Brian L.

    1997-08-01

    In the past 50 years, dramatic changes have occurred in the Flathead Lake and River system. Degradation of fishery resources has been evident, in part due to deterioration of aquatic habitat and introduction of non-endemic fish and invertebrate species. Habitat loss has been attributed to many factors including the construction and operation of Hungry Horse Dam, unsound land use practices, urban development, and other anthropogenic and natural disturbances. Fish migration has also been limited by barriers such as dams and impassible culverts. Cumulatively, these factors have contributed to declines in the distribution and abundance of native fish populations. Recovery of fish populations requires that a watershed approach be developed that incorporates long-term aquatic habitat needs and promotes sound land use practices and cooperation among natural resource management agencies. In this document, the authors (1) describe completed and ongoing habitat improvement and fish passage activities under the Hungry Horse Fisheries Mitigation Program, (2) describe recently identified projects that are in the planning stage, and (3) develop a framework for identifying prioritizing, implementing, and evaluating future fish habitat improvement and passage projects.

  16. Effects of the Operation of Hungry Horse Dam on the Kokanee Fishery in the Flathead River System, 1984 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.

    1984-12-01

    This study assessed the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. This report covers the 1983-84 field season concerning the effects of Hungry Horse operations on kokanee abundance and reproductive success in the upper Flathead River system. This report also addresses the projected recovery of the main stem kokanee run under the flow regime recommended by the Department of Fish, Wildlife and Parks and implemented by the Bureau of Reclamation and Bonneville Power Administration in 1982. An estimated 58,775 kokanee reached spawning grounds in the Flathead River System in 1983. The 1983 spawning run was composed of 92% age III + fish, as compared to an average of 80% from 1972-1983. A total of 6883 kokanee redds were enumerated in the main stem Flathead River in 1983. A total of 2366 man-days of angling pressure was estimated during the 1983 kokanee lure fishery in the Flathead River system. Estimated numbers of fry emigrating from McDonald Creek, the Whitefish River and Brenneman's Slough were 13,100,000, 66,254 and 37,198, yielding egg to fry survival rates of 76%, 10.4% and 19.2%.

  17. Effects of the Operation of Kerr and Hungry Horse Dams on the Kokanee Fishery in the Flathead River System, 1979-1985 Final Research Report.

    Energy Technology Data Exchange (ETDEWEB)

    Clancy, Patrick

    1986-05-01

    This study was undertaken to assess the effects of the operation of Hungry Horse Dam on the kokanee fishery in the Flathead River system. Studies concerning operation of the dam on the Flathead River aquatic biota began in 1979 and continued to 1982 under Bureau of Reclamation funding. These studies resulted in flow recommendations for the aquatic biota in the main stem Flathead River, below the influence of Hungry Horse Dam on the South Fork. Studies concerned specifically with kokanee salmon have continued under Bonneville Power Administration funding since 1982. This completion report covers the entire study period (September 1979 to June 1985). Major results of this study were: (1) development and refinement of methods to assess hydropower impacts on spawning and incubation success of kokanee; (2) development of a model to predict kokanee year class strength from Flathead River flows; and (3) implementation of flows favorable for successful kokanee reproduction. A monitoring program has been developed which will assess the recovery of the kokanee population as it proceeds, and to recommend management strategies to maintain management goals for the kokanee fishery in the river system.

  18. Effect of the Operation of Kerr and Hungry Horse Dams on the Reproduction Success of Kokanee in the Flathead River System, 1986 Annual Progress Report.

    Energy Technology Data Exchange (ETDEWEB)

    Beattie, Will; Clancey, Patrick

    1987-03-01

    Flathead Lake. Our results show that egg survival in the river has improved in response to stabilized discharge from Hungry Horse Dam. Drawdown exposure continues to limit egg survival in lakeshore redds. Study of the variability in growth and survival of young-of-the-year fish in Flathead Lake will further the understanding of factors which cause fluctuation in the kokanee population.

  19. Pumped hydroelectric storage utilization assessment: Forerunner of renewable energy integration or Trojan horse?

    OpenAIRE

    KOUGIAS IOANNIS; SZABO SANDOR

    2017-01-01

    Pumped hydroelectric storage (PHS) is the main utility-scale storage technology. Although PHS systems generally constitute a fraction of generation, they receive increasing attention due to their potential balancing role towards higher penetration of variable renewable energy sources (RES). In the European context it is widely believed that PHS are key elements of the ongoing energy transition. The present analysis examines if this assumption is valid and PHS utilization grows parallel to RES...

  20. Horses

    Science.gov (United States)

    ... young children or people with very little riding experience who are living in the household. Research how to properly care for your horse before purchase. Ask your veterinarian about the proper food, care, ...

  1. The Hungry Season

    African Journals Online (AJOL)

    start to go some way towards addressing this fundamental question. A delightful animation of The Hungry Season, commissioned by Leonie Joubert and funded by the University of Cape Town's Criminology. Department and the Embassy of Finland, is available online at http://www.youtube.com/ watch?v=iX77NZttLKo.

  2. Hungry pigeons make suboptimal choices, less hungry pigeons do not.

    Science.gov (United States)

    Laude, Jennifer R; Pattison, Kristina F; Zentall, Thomas R

    2012-10-01

    Hungry animals will often choose suboptimally by being attracted to reliable signals for food that occur infrequently (they gamble) over less reliable signals for food that occur more often. That is, pigeons prefer an option that 50 % of the time provides them with a reliable signal for the appearance of food but 50 % of the time provides them with a reliable signal for the absence of food (overall 50 % reinforcement) over an alternative that always provides them with a signal for the appearance of food 75 % of the time (overall 75 % reinforcement). The pigeons appear to choose impulsively for the possibility of obtaining the reliable signal for reinforcement. There is evidence that greater hunger is associated with greater impulsivity. We tested the hypothesis that if the pigeons were less hungry, they would be less impulsive and, thus, would choose more optimally (i.e., on the basis of the overall probability of reinforcement). We found that hungry pigeons choose the 50 % reinforcement alternative suboptimally but less hungry pigeons prefer the more optimal 75 % reinforcement. Paradoxically, pigeons that needed the food more received less of it. These findings have implications for how level of motivation may also affect human suboptimal choice (e.g., purchase of lottery tickets and playing slot machines).

  3. 78 FR 28826 - Lakeport Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One...

    Science.gov (United States)

    2013-05-16

    ... Hydroelectric Associates, Lakeport Hydroelectric Corporation, Lakeport Hydroelectric One, LLC; Notice of..., Lakeport Hydroelectric Associates and Lakeport Hydroelectric Corporation (transferors) and Lakeport Hydroelectric One, LLC (transferee) filed an application for the transfer of license for the Lakeport Project...

  4. A Baecklund transformation between two integrable discrete hungry systems

    Energy Technology Data Exchange (ETDEWEB)

    Fukuda, Akiko, E-mail: j1409704@ed.kagu.tus.ac.j [Department of Mathematical Information Science, Graduate School of Science, Tokyo University of Science, 1-3 Kagurazaka, Shinjuku-ku, Tokyo 162-8601 (Japan); Yamamoto, Yusaku [Graduate School of System Informatics, Kobe University, 1-1 Rokkodai-cho, Nada-ku, Kobe 657-8501 (Japan); Iwasaki, Masashi [Department of Informatics and Environmental Science, Kyoto Prefectural University, 1-5, Nakaragi-cho, Shimogamo, Sakyo-ku, Kyoto 606-8522 (Japan); Ishiwata, Emiko [Department of Mathematical Information Science, Tokyo University of Science, 1-3 Kagurazaka, Shinjuku-ku, Tokyo 162-8601 (Japan); Nakamura, Yoshimasa [Graduate School of Informatics, Kyoto University, Yoshida-Honmachi, Sakyo-ku, Kyoto 606-8501 (Japan)

    2011-01-17

    The discrete hungry Toda (dhToda) equation and the discrete hungry Lotka-Volterra (dhLV) system are known as integrable discrete hungry systems. In this Letter, through finding the LR transformations associated with the dhToda equation and the dhLV system, we present a Baecklund transformation between these integrable systems.

  5. A Baecklund transformation between two integrable discrete hungry systems

    International Nuclear Information System (INIS)

    Fukuda, Akiko; Yamamoto, Yusaku; Iwasaki, Masashi; Ishiwata, Emiko; Nakamura, Yoshimasa

    2011-01-01

    The discrete hungry Toda (dhToda) equation and the discrete hungry Lotka-Volterra (dhLV) system are known as integrable discrete hungry systems. In this Letter, through finding the LR transformations associated with the dhToda equation and the dhLV system, we present a Baecklund transformation between these integrable systems.

  6. Hydroelectricity and sustainable development

    International Nuclear Information System (INIS)

    Dubeau, D.

    1995-01-01

    From 1975 to 1992, hydroelectricity helped reduce greenhouse gas emissions in Quebec by 20%. For Hydro-Quebec, energy conservation and hydroelectric development are basic complementary tools for sustainable development. Recent studies show that developing only 50% of economically exploitable hydroelectric potential (30% of the gross theoretical potential) of different regions worldwide would considerably reduce greenhouse gas and SO 2 emissions. However, hydroelectric systems produce environmental and social impacts locally that require mitigative measures. To fulfill its mandate in a sustainable development context, Hydro-Quebec has adopted methods such as integrated resource planning, the assessment of externalities, multi criteria decision tools and public participations

  7. Hydroelectric Power Plants Dobsina

    International Nuclear Information System (INIS)

    Majercak, V.; Srenkelova, Z.; Kristak, J.G.

    1997-01-01

    In this brochure the Hydroelectric Power Plants Dobsina, (VED), subsidiary of the utility Slovenske Elektrarne, a.s. (Slovak Electric, plc. Bratislava) are presented. VED is mainly aimed at generating peak-load electrical energy and maintenance of operational equipment. Reaching its goals, company is first of all focused on reliability of production, economy and effectiveness, keeping principles of work safety and industry safety standards and also ecology. VED operates eight hydroelectric power plants, from which PVE Ruzin I and PVE Dobsina I are pump storage ones and they are controlled directly by the Slovak Energy Dispatch Centre located in Zilina thought the system LS 3200. Those power plants participate in secondary regulation of electrical network of Slovakia. They are used to compensate balance in reference to foreign electrical networks and they are put into operation independently from VED. Activity of the branch is focused mainly on support of fulfilment of such an important aim as electric network regulation. Beginnings of the subsidiary Hydroelectric Power Plants Dobsina are related to the year of 1948. After commissioning of the pump storage Hydroelectric Power Plants Dobsina in 1953, the plant started to carry out its mission. Since that time the subsidiary has been enlarged by other seven power plants, through which it is fulfilling its missions nowadays. The characteristics of these hydroelectric power plants (The pump-storage power plant Dobsina, Small hydroelectric power plant Dobsina II, Small hydroelectric power plant Rakovec, Small hydroelectric power plant Svedlar, Hydroelectric power plant Domasa, The pump-storage power plant Ruzin, and Small hydroelectric power plant Krompachy) are described in detail. Employees welfare and public relations are presented

  8. Fish and hydroelectricity

    International Nuclear Information System (INIS)

    Zorpette, G.

    1990-01-01

    This paper reports on the problems that hydroelectric plants have regarding fish populations. The utilities that operate these plants are finding that accommodating migrating fish presents unique engineering challenges, not the least of which involves designing and building systems to protect fish species whose migratory behavior remains something of a mystery. Where such systems cannot be built, the status of hydroelectric dams may be in doubt, as is now the case with several dams in the United States. A further twist in some regions in the possibility that certain migratory fish will be declared threatened or endangered-a development that could wreak havoc on the hydroelectric energy supply in those regions

  9. Small hydroelectric engineering practice

    CERN Document Server

    Leyland, Bryan

    2014-01-01

    Small Hydroelectric Engineering Practice is a comprehensive reference book covering all aspects of identifying, building, and operating hydroelectric schemes between 500 kW and 50 MW. In this range of outputs there are many options for all aspects of the scheme and it is very important that the best options are chosen.As small hydroelectric schemes are usually built against a limited budget it is extremely important that the concept design is optimum and every component is designed to maximise the benefi t and minimise the cost. As operating costs are often a high proportion of the income it i

  10. Small hydroelectric power plants

    International Nuclear Information System (INIS)

    Helgesen, Boerre

    2002-01-01

    Small hydroelectric power plants are power plants of 1 - 10 MW. For a supplier, this is an unnatural limit. A more natural limit involves compact engine design and simplified control system. The article discusses most of the engine and electrotechnical aspects in the development, construction and operation of such a plant

  11. Hungry Cities Initiative: Informality, Inclusive Growth, and Food ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    Hungry Cities Initiative: Informality, Inclusive Growth, and Food Security in ... Within this context, the urban food economy is an important laboratory for ... The International Partnerships for Sustainable Societies program is funding this project.

  12. Hydroelectric power and privatisation

    International Nuclear Information System (INIS)

    Frankovic, B.

    2000-01-01

    The paper considers privatisation aspects of both the existing hydroelectric power plants presently owned by the Croatian state and those to be built in the future. The paper highlights the water power utilisation as just one of the possible purposes of water and land resources development, which are the most important segment of the physical development of the Croatian territory, and the fact that water and land are public wealth. (author)

  13. Attracting finance for hydroelectric power

    International Nuclear Information System (INIS)

    Besant-Jones, John

    1996-01-01

    Hydroelectricity will continue to be important for meeting power requirements in developing countries. Much of the funding required for hydroelectric projects must come from non-government source; hydroelectric projects will therefore need to be attractive to private investors. This note explores the risks investors face, how this can be mitigated, and how the World Bank group can offer advice (as well as finance) to member countries to facilitate investment in hydro electric projects. 3 refs., 1 fig

  14. Environment and hydroelectricity colloquium - Synthesis

    International Nuclear Information System (INIS)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-01

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  15. Proposed Dunvegan hydroelectric project

    International Nuclear Information System (INIS)

    Houston, M.

    2001-01-01

    A new hydroelectric project is being proposed on the Peace River in the vicinity of Dunvegan, Alberta, by Glacier Power. The proposal calls for a low head, run-of-the-river hydroelectric power plant which would comprise a powerhouse containing 40 Kaplan turbines, a weir section, two fishways and a boat lock. The capacity of the generating plant would be 80 MW. As per established guidelines, the review process was initiated in July 1999 and is ongoing. Stakeholders, government agencies, both at the federal and provincial levels, are involved in the review process. The potential effects on the ice regime, fish passage and fish mortality and bank stability are the issues that have warranted the most attention to date. Scheduled to begin on October 2, 2001, a public hearing on the project has been arranged by the Alberta Energy and Utilities Board. The objective sought by Glacier Power is to have the project certified as being a green-power plant. Green power is defined as power produced from renewable sources with low environmental impact. The production of power with minimal environmental impacts is being encouraged in Alberta by Glacier Power, which sells power for a premium. 6 refs., 4 figs

  16. Nutritive and replacement value of hungry rice ''Acha'' ( Digitaria ...

    African Journals Online (AJOL)

    The hungry rice grains (HG) were determined for nutrients and anti nutrients and evaluated for growth performance. Five dietary diets were formulated with AG replacing maize at 0, 25, 50, 75 and 100 %. A total of 150 7days-old broiler chicks (Abor-Acre) were randomly allotted to five treatments of 30 birds each, replicated ...

  17. 76 FR 61689 - Sutton Hydroelectric Company, LLC

    Science.gov (United States)

    2011-10-05

    ... Hydroelectric Company, LLC Notice of Site Visit On February 6, 2008, Sutton Hydroelectric Company, LLC (Sutton Hydroelectric) filed a notice of intent and a preliminary application document to license its proposed Sutton Hydroelectric Project No. 12693. The project would be located at the U.S. Army Corps of Engineers' (Corps...

  18. Benefits of a hungry mind: When hungry, exposure to food facilitates proactive interference resolution.

    Science.gov (United States)

    Maran, Thomas; Sachse, Pierre; Martini, Markus; Furtner, Marco

    2017-01-01

    Hunger is an everyday motivational state, which biases cognition to detect food. Although evidence exists on how hunger affects basic attentional and mnemonic processes, less is known about how motivational drive for food modulates higher cognition. We aimed to investigate the effects of food deprivation on proactive interference resolution, in the presence and absence of food. Normal-weight participants performed a recency probes paradigm providing an experimental block with food and object stimuli as well as a control block with object stimuli only, in a fasted and a sated state. Results showed that the interaction of shifts in nutritional state with the perception of food cues evoked an altered resolution of proactive interference. Satiety led to impaired performance, whereas a hungry state resulted in strengthened resistance to proactive interference and lying in between, the control block presenting neutral objects remained unaffected by nutritional state manipulation. Additionally, a further increase in proactive interference resolution occurred when the conflicting probe depicted food compared to non-food objects. We conclude that when exposed to food, hunger initiates biased competition of active memory representations in favor of prioritized source information at cost of familiar, but irrelevant information. The implications of these findings are discussed in terms of an arousal-biased competition in working memory. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. The Innavik hydroelectric project

    Energy Technology Data Exchange (ETDEWEB)

    St-Pierre, S.; McNeil, E.; Gacek, J. [RSW Inc., Montreal, PQ (Canada); Atagotaaluk, E. [Pituvik Landholding Corp., Nunavik, PQ (Canada); Henderson, C. [Lumos Energy, Ottawa, ON (Canada)

    2009-07-01

    The village of Inukjuak in northern Quebec is not connected to the main electrical grid. This remote village is one of 14 Inuit communities in the Nunavik administrative region where electricity is generated by diesel thermal power plants under the direction of Hydro-Quebec Distribution's Isolated Grid subdivision. The heating of water and buildings is supplied by heavy fuel-oil. A compensation program for the price of fuel-oil is applied in the community. This presentation discussed the need for developing renewable energy sources in order to respond to the energy demands of isolated grids. The community of Inukjuak plans on developing the water resources of the Inukjuak River in order to produce hydroelectricity and reduce the use of diesel fuel. Several possible development sites were identified. The project will contribute to a reduction in energy costs while reducing greenhouse gas emissions. Revenues generated from the power plant will help the village in their economic development by enabling the completion of various community projects. The sustainable development approach taken for the project was discussed and the project's main technical, environmental and social issues were identified. The project is expected to reduce the production of an estimated 8 tons of carbon dioxide emissions by 2011 and nearly 15 tons after 10 years of operation.

  20. Hydroelectric power and hydroelectric power plants. V. 1

    International Nuclear Information System (INIS)

    1991-06-01

    Following the oil crises of 1973 and 1979, there was renewed and justifiable interest in small hydroelectric plants. The maximum power of these plants rarely exceeds 10 MW, and their development will surely increase in the coming decades. Hydraulic power is a national renewable resource, unaffected by geopolitical problems, and above all, non polluting. Many countries with their own hydraulic resources in both the industrialized and the developing world have expressed needs for the development of small hydroelectric plants. Hidroenergia 91 Conference is the opportunity to take stock of knowledge gained in the vast field of small hydroelectric plants. The meeting is divided into four subjects: 1 methods for decision aid; 2 environmental impact and accompanying answers; 3 national development policy; 4 world market and international cooperation. This meeting contains 75 papers, 8 papers are in the INIS scope and 72 papers are in the ENERGY DATA BASE scope

  1. Libby/Hungry Horse Dams Wildlife Mitigation : Montana Wildlife Habitat Protection : Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Wood, Marilyn

    1992-12-01

    The purpose of this project was to develop and obtain information necessary to evaluate and undertake specific wildlife habitat protection/enhancement actions in northwest Montana as outlined in the Columbia River Basin Fish and Wildlife Program. Three waterfowl projects were evaluated between September 1989 and June 1990. Weaver's Slough project involved the proposed acquisition of 200 acres of irrigated farmland and a donated conservation easement on an additional 213 acres. The proposal included enhancement of the agricultural lands by conversion to upland nesting cover. This project was rated the lowest priority based on limited potential for enhancement and no further action was pursued. The Crow Creek Ranch project involved the proposed acquisition of approximately 1830 acres of grazing and dryland farming lands. The intent would be to restore drained potholes and provide adjacent upland nesting cover to increase waterfowl production. This project received the highest rating based on the immediate threat of subdivision, the opportunity to restore degraded wetlands, and the overall benefits to numerous species besides waterfowl. Ducks Unlimited was not able to participate as a cooperator on this project due to the jurisdiction concerns between State and tribal ownership. The USFWS ultimately acquired 1,550 acres of this proposed project. No mitigation funds were used. The Ashley Creek project involved acquisition of 870 acres adjacent to the Smith Lake Waterfowl Production Area. The primary goal was to create approximately 470 acres of wetland habitat with dikes and subimpoundments. This project was rated second in priority due to the lesser threat of loss. A feasibility analysis was completed by Ducks Unlimited based on a concept design. Although adequate water was available for the project, soil testing indicated that the organic soils adjacent to the creek would not support the necessary dikes. The project was determined not feasible for mitigation implementation. Although no waterfowl/wetland projects were implemented using mitigation funds, 1,550 acres were protected based on work done under this project.

  2. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  3. Central hydroelectric of Santa Ana

    International Nuclear Information System (INIS)

    Pardo A, German

    2000-01-01

    The paper is related to the construction of an alternating tunnel of conduction to take advantage of the available hydraulic load among the Wiesner Plant and Santa Ana's tanks and of Suba, works required to build a hydroelectric power station with a generation capacity of approximately of 12 MW

  4. 2020 Focus briefs on the world's poor and hungry people:

    OpenAIRE

    IFPRI

    2007-01-01

    Contents: 1.The Changing Profile of Poverty in the World/Shaohua Chen and Martin Ravallion. 2.Characteristics and Causes of Severe Poverty and Hunger/Akhter U. Ahmed, Ruth Vargas Hill, Lisa C. Smith, and Tim Frankenberger. 3.The Poorest and Hungry: Looking Below the Line/Akhter U. Ahmed, Ruth Vargas Hill, and Doris M. Wiesmann. 4.Mapping Where the Poor Live/Todd Benson, Michael Epprecht, and Nicholas Minot 5.Child Malnutrition in India and China/Peter Svedberg. 6.Poverty and the Globalization...

  5. Annual air pollution caused by the Hungry Ghost Festival.

    Science.gov (United States)

    Khezri, B; Chan, Y Y; Tiong, L Y D; Webster, R D

    2015-09-01

    Burning of joss paper and incense is still a very common traditional custom in countries with a majority Chinese population. The Hungry Ghost Festival which is celebrated in the 7 month of the Chinese calendar is one of the events where joss paper and incense are burned as offerings. This study investigates the impact of the Ghost Month Festival (open burning event) on air quality by analysis of the chemical composition of particulate matter (PM) and rainwater samples collected during this event, compared with data collected throughout the year, as well as bottom ash samples from burning the original joss paper and incense. The results showed that the change in the chemical composition of the rainwater and PM2.5 (PM ≤ 2.5 μm) atmospheric samples could be correlated directly with burning events during this festival, with many elements increasing between 18% and 60% during August and September compared to the yearly mean concentrations. The order of percentage increase in elemental composition (in rain water and PM2.5) during the Hungry Ghost Festival is as follows: Zn > Ca > K > Mg > Fe > Al > Na ∼ Mn ∼ Ti ∼ V > Cu > As > Ni > Co > Cd > Cr > Pb. The chemical composition of the original source materials (joss paper and incense for combustion) and their associated bottom ash were analysed to explain the impact of burning on air quality.

  6. Feasibility assessment, Lowell Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    1979-04-01

    The results are presented of a feasibility analysis for hydroelectric generating facilities on the Merrimack River at Lowell, Massachusetts. The projected facility would utilize the existing Pawtucket Dam and a portion of the existing Northern Canal. The project was examined for economic, engineering, and environmental viability, and the results are favorable. The owners intend to proceed to the next step of negotiating a firm power purchase agreement.

  7. WAR HORSES:

    DEFF Research Database (Denmark)

    War Horses: Helhesten and the Danish Avant-Garde During World War II This exhibition is the first to explore the history and significance of the accomplishments of Danish artists working during the Nazi occupation of their country (1940-45), who called themselves Helhesten, such as Ejler Bille......-1951), which they became part of. Cobra greatly influenced the development of European modern art after World War II. The exhibition includes over 100 works and reconstructs for the first time the most important exhibition these artists staged in Denmark during the war, 13 Artists in a Tent (1941). It draws...

  8. Hydroelectric power stations and ecological energy policy

    International Nuclear Information System (INIS)

    Novakova, R.

    1993-01-01

    The report discusses the place of hydroenergy in solving the power and ecological problems of Bulgaria: level of building up of the hydroelectric capacity of the country; possibilities for new hydro electric construction; environmental problems of design, construction and operation of the hydroelectric units; advantages of the hydroelectric engineering. The possibilities of the hydroelectric power plants as an alternative of the other more or less conventional electicity producers are shown in order to help in decision making as regards the problems of the economic, power and environmental crisis. (author)

  9. 78 FR 62616 - Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer...

    Science.gov (United States)

    2013-10-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 3730-005] Salmon Creek Hydroelectric Company, Salmon Creek Hydroelectric Company, LLC; Notice of Transfer of Exemption 1. By letter filed September 23, 2013, Salmon Creek Hydroelectric Company informed the Commission that they have...

  10. Competitive analysis of small hydroelectric power plants

    International Nuclear Information System (INIS)

    Assad, L.S.; Placido, R.

    1990-01-01

    The agreement between CPFL/UNICAMP/EFEI for developing energetic planning of Small Hydroelectric Power Plants construction is described. Some notions for showing the more economic alternative between decide by Small Hydroelectric Power Plants construction and continue supply the market by inter ligated system generation are shown in this stage of the agreement. (author)

  11. Private affairs [Canon del Pato hydroelectric project

    International Nuclear Information System (INIS)

    Moxon, S.

    1997-01-01

    The privatisation of the electric power industry in Peru has caused growth in its hydroelectric generation capacity. Increased interest in hydroelectric power, based on economic considerations, had led to decision on upgrading the two main hydropower plants which will provide almost 100 MW of extra capacity over a three year period, and provide competitively priced electric power. (UK)

  12. Climate change and hydroelectric production

    International Nuclear Information System (INIS)

    Raban, R.R.

    1991-01-01

    Manitoba Hydro is planning for the possibility of climate change, which has the potential to adversely effect its hydroelectric generating potential. Theoretical and physical evidence for a global warming are reviewed, and it is shown that some of Manitoba Hydro's own measurements support a warming hypothesis. The most significant effect on the hydraulic generating system would be associated with diminished river flows. Winter hydraulic generation capability would be reduced if the magnitude of the change were sufficient to cause several freeze-ups and break-ups within a given season. Incidence of transmission line icing would probably increase, permafrost recession may undermine tower foundations, and conductor resistance may increase to increase energy loss. Ice crossings and winter roads would be adversely affected, and a restriction on fossil fuel consumption could limit thermal generation and increase demand for hydroelectric or nuclear energy. Manitoba Hydro is examining a number of no-cost or low-cost options to accomodate potential climate change, using probable maximum precipitation hydrologic technology, research into conductor galloping, line icing detection, and hydrological investigations

  13. Fish screens at hydroelectric diversions

    International Nuclear Information System (INIS)

    Ott, R.F.

    1994-01-01

    Preventing downstream migrating fish from entering the turbines at hydroelectric projects is a standard mitigation goal of state and federal fishery management agencies. The object is to minimize the adverse impacts to the fish associated with the exclusion and passage through the bypass water conveyance facilities. In the western United States, most of the fishery management agencies have fish screen design criteria that focus on the approach and transportational velocities, maximum opening dimensions of the screen material, and the cleaning standards. Recently, more attention has been given to fish behavioral traits such as attraction and sustained and darting swimming speed, which has resulted in more attention to the position of the screens to the flow and the length of time the downstream migrants are exposed to the screens. Criteria for length of time of exposure, size and position of bypass, flow and velocities in the bypass entrances, discharge requirements back into the receiving water, and exposure to predation have created unique challenges to the fish screen designer. This paper discusses some of the more recent types of fixed fish screens that are being installed at hydroelectric plants that meet these challenges

  14. Hydroelectric power in Romania. Past - present - future

    International Nuclear Information System (INIS)

    Bogan, V.

    1996-01-01

    This paper presents an analysis of the past and present situation in hydroelectric power (achievements, rates of commissioning and so on) and the future strategies for the hydroelectric power resource development in the conditions of a free market economy. At present the contribution of hydroelectric power in the Romania's total power balance is about 16,500 GW h/year which represents nearly 28 %. The theoretical hydroelectric power potential of Romania is 75,000 GW h/year while the technical potential, which could actually be developed, is only 40,000 GW h/year. Finally, there are presented the main directions in the hydroelectric power development up to the year 2020. (author) 3 tabs

  15. Food loss in a hungry world, a problem?

    Directory of Open Access Journals (Sweden)

    Natalia Martínez Z.

    2014-08-01

    Full Text Available Mainly in developing countries, food loss and waste is a problem that is difficult to measure. Investigations have been conducted in industrialized countries; however, consistent evidence of how much is really being depleted is limited. The accessible data give the illusion of evidence, but are supported by very restricted facts. In recent years, food waste and loss have gained importance because more than 35% of food is wasted. Nevertheless, with this percentage of food, most of the 800 million people that go hungry every day in the world could be fed. This reflection paper aims to describe the different approaches and meanings of food waste, food loss and food wastage. Similarly, this article identifies the phases of the food supply chain where food is being lost and wasted. Based on the available data, developed and developing countries are compared. It was concluded that, in developed countries, the most important losses are in the consumption phase; in developing countries, the losses take place in the growing and harvesting phase. Changing consumption habits as well as the improvement of cropping and harvesting processes could be an option for reducing this problem, especially in developing countries.

  16. Welfare of Aged Horses

    Directory of Open Access Journals (Sweden)

    Catherine McGowan

    2011-10-01

    Full Text Available Horses form a unique and special part of their owners’ lives and aged horses are no exception. This review considers the health and management of aged horses, including the role of the owner and their perceptions of aged horses, potential threats or risks to their welfare and finally, factors affecting quality of life and euthanasia of aged horses. Owners of aged horses are concerned about the health, welfare and quality of life of their aged animals. Yet surveys of management and preventive healthcare reflect that there may be some limitations to what owners are actually achieving in practice. They show declining management as horses age, particularly for the retired horse and insufficient appropriate preventive healthcare via veterinary surgeons. The veterinary surgeon plays an essential and influential role in preventive healthcare, management of diseases and disorders and ultimately in the decision making process for euthanasia of aged horses at the end of their lives. The value of aged horses should not be underestimated by veterinarians and others working with them and the continuing care of aged horses should be regarded with the same importance as the care of younger horses with more obvious monetary value.

  17. Evaluation of our hydroelectric resources

    International Nuclear Information System (INIS)

    Unsal, Istemi; Onoz, Bihrat

    2006-01-01

    Because of the geo energetic position of our country, its geo strategic importance becomes even greater due to the fact that one of the basic problems of our century is to meet the energy demand. In this study one of the most significant energy resources of our country, hydroelectric energy production resource has been made of subject and a general evaluation has been performed considering our country's conditions. In meeting countries general energy demands diversity of production sources and resources where they are supplied from shows great importance. Our country is quite rich from the aspect of hydroelectric potential which is the most significant among the renewable energy resources. That is why our hydroelectric potential (HEP) has been investigated by considering Feasibility, Operation Specifications, Economy, External Dependence issues in electrical energy planning.. In our country, it is frequently being emphasized that 35% of our HEP has been evaluated though which HEP is of subject, is not explained. While HEP is defined at 4 levels namely as Gross (GHEP), Technical (THEP), Economic (EHEP) and Evaluated HEPs. Our country is placed in 2nd place in Europe from the aspect of GHEP whereas it is placed as one of the last from the aspect of evaluated HEP. Capacity usage for hydroelectric plants has been foreseen as 40.5% (3548 hours/year) by the 2005-2020 planning prepared by ETKB (Ministry of Energy and Natural Resources). On the other hand, capacity usage has been found as 40.3% for the analysis for realized cases using DSI (State Water Works) 2006 data, which is only 0.5% below the foreseen value.What mainly lowers the realized average is the hard pressure applied to hydraulic plants during the period 1995-1999. The situation which arises as a result of this operation policy is wrongly interpreted by DPT (State Planning Organization) and consequently hydroelectric plants are defined as unreliable. However, since sufficient storage plants which will

  18. The hydroelectric power market in the world

    International Nuclear Information System (INIS)

    Junius, A.

    2004-10-01

    This work makes a synthesis of the hydroelectric power market, of its present day capacity in the world, and of its perspectives of development in the future. The first part treats of the hydroelectric facilities and of the market of hydroelectric power plants. It presents the technology used and the different types of plants, the evolution of their geographical setting and the future potentialities of development. The second part deals with the competitiveness of this industry with respect to: the energy policy stakes, the profitability, the energy independence of countries, the regulation of power networks and the environmental impacts. (J.S.)

  19. Small hydroelectric power stations and their reality

    International Nuclear Information System (INIS)

    Kamenski, Miroslav

    1999-01-01

    Construction of a small hydroelectric power station provides additional amounts of electric energy, engages a private capital, revives investment activities and promotes the use of renewable energy sources. Transmission losses are reduced, a voltage of higher quality is achieved and idle power is compensated by the generation of electricity in the small hydroelectric power stations and at the place of consumption. Legislation and technical regulations, however, require a multidisciplinary approach, defining of complex spaces and environmental protection. Unfortunately, complete documents should be prepared for small,hydroelectric plants just as for big ones what is a long procedure and many of those papers are unnecessary or even superfluous. (Author)

  20. Improvements for conventional clean energies: hydroelectric power

    International Nuclear Information System (INIS)

    Henry, P.

    1991-01-01

    Hydro-electric energy offers considerable possibilities and advantages which should be exploited before considering the construction of power which use fossil fuels. In fact: - hydro-electric is the only renewable energy available in very large quantities at competitive prices, - there are still many possibilities for producing it since at present only 14% is exploited, - hydraulic machines have been considerably improved over recent years, - the improvements make it possible to use watercourses in successive stages thus considerably reducing damage to the environment, - hydro-electric installations have a regulating effect, - vast areas of uncultivated land can be irrigated using the water reserves created by the artificial lakes. All these reasons favour intensive exploitation of hydro-electric energy reserves, in spite of the initial investment costs, which are sometimes higher than those for constructing fuel/driven power stations. (author) 9 figs., 1 tab., 3 refs

  1. Hydroelectric power is green, although controversial

    International Nuclear Information System (INIS)

    Schulp, A.

    2003-01-01

    Hydroelectric power is worldwide the most important source of renewable energy. Still, it has some controversial aspects, which are briefly discussed in this article, focusing on Belgium and the Netherlands [nl

  2. Greenhouse gas emissions from hydroelectric reservoirs

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.

    1994-01-01

    In a recent paper, Rudd et al. have suggested that, per unit of electrical energy produced, greenhouse-gas emissions from some hydroelectric reservoirs in northern Canada may be comparable to emissions from fossil-fuelled power plants. The purpose of this comment is to elaborate these issues further so as to understand the potential contribution of hydroelectric reservoirs to the greenhouse effect. More than focusing on the total budget of carbon emissions (be they in the form of CH 4 or be they in the form of CO 2 ), this requires an evaluation of the accumulated greenhouse effect of gas emissions from hydroelectric reservoirs and fossil-fuelled power plants. Two issues will be considered: (a) global warming potential (GWP) for CH 4 ; and (b) how greenhouse-gas emissions from hydroelectric power plants stand against emissions from fossil-fuelled power plants with respect to global warming

  3. The environment and the hydroelectric in Amazonia

    International Nuclear Information System (INIS)

    La Rovere, E.L.

    1992-01-01

    Some aspects about social and environmental impacts due to the hydroelectric power plants constructed in Amazonia region are presented, including considerations of energy planning and management with international example. (C.G.C.)

  4. Decentralized planning of hydroelectric power systems

    International Nuclear Information System (INIS)

    Binato, S.; Pereira, M.V.F.

    1995-01-01

    This paper discusses the application of marginal cost concepts to the expansion planning of hydroelectric systems. It is shown that the renumeration of hydroelectric plants should not be based on their energy production, as this leads to excessive revenues for the plant owner, and distorts the dimensioning of upstream reservoirs. In order to produce the adequate economic signals, it is necessary to separate the contributions of turbines and reservoirs. Examples from the Brazilian power system are presented and discussed

  5. Increase of hydroelectric power plant operation reliability

    International Nuclear Information System (INIS)

    Koshumbaev, M.B.

    2006-01-01

    The new design of the turbine of hydroelectric power plant (HPP) is executed in the form of a pipe with plates. Proposed solution allows increasing the hydroelectric power plant capacity at existing head and water flow. At that time the HPP turbine reliability is increase, its operation performances are improving. Design efficiency is effective mostly for small-scale and micro-HPP due to reliable operation, low-end technology, and harmless ecological application. (author)

  6. Optimal control of hydroelectric facilities

    Science.gov (United States)

    Zhao, Guangzhi

    This thesis considers a simple yet realistic model of pump-assisted hydroelectric facilities operating in a market with time-varying but deterministic power prices. Both deterministic and stochastic water inflows are considered. The fluid mechanical and engineering details of the facility are described by a model containing several parameters. We present a dynamic programming algorithm for optimizing either the total energy produced or the total cash generated by these plants. The algorithm allows us to give the optimal control strategy as a function of time and to see how this strategy, and the associated plant value, varies with water inflow and electricity price. We investigate various cases. For a single pumped storage facility experiencing deterministic power prices and water inflows, we investigate the varying behaviour for an oversimplified constant turbine- and pump-efficiency model with simple reservoir geometries. We then generalize this simple model to include more realistic turbine efficiencies, situations with more complicated reservoir geometry, and the introduction of dissipative switching costs between various control states. We find many results which reinforce our physical intuition about this complicated system as well as results which initially challenge, though later deepen, this intuition. One major lesson of this work is that the optimal control strategy does not differ much between two differing objectives of maximizing energy production and maximizing its cash value. We then turn our attention to the case of stochastic water inflows. We present a stochastic dynamic programming algorithm which can find an on-average optimal control in the face of this randomness. As the operator of a facility must be more cautious when inflows are random, the randomness destroys facility value. Following this insight we quantify exactly how much a perfect hydrological inflow forecast would be worth to a dam operator. In our final chapter we discuss the

  7. Hydroelectricity, an opportunity to grab?

    International Nuclear Information System (INIS)

    Yergeau, M.

    1997-01-01

    The deregulation within the electricity sector and the government''s project approval process were discussed. Deregulation was meant to simplify trade while providing consumers with a fair price, quality service and end-product quality. Proposals for large hydroelectric projects, however, must still be authorized by the government. The environmental assessment process for projects involving energy transmission infrastructures is long and complicated. All of Hydro-Quebec''s recent large projects were challenged in court. While energy market players need environmentally credible generating schemes, there appears to be nothing on the horizon to suggest that the approval process is going to be made easier soon. Indeed, there is every reason to believe that recent gains in environmental and social protection will not be sold off to ease the burden on utility companies to prove their case before construction. The choice is between speed and quality in matters of authorization, and while every effort should be made to combine the two, when it comes down to a choice, there should be no question as to what must be preserved. 2 figs

  8. Inhalation Therapy in Horses.

    Science.gov (United States)

    Cha, Mandy L; Costa, Lais R R

    2017-04-01

    This article discusses the benefits and limitations of inhalation therapy in horses. Inhalation drug therapy delivers the drug directly to the airways, thereby achieving maximal drug concentrations at the target site. Inhalation therapy has the additional advantage of decreasing systemic side effects. Inhalation therapy in horses is delivered by the use of nebulizers or pressured metered dose inhalers. It also requires the use of a muzzle or nasal mask in horses. Drugs most commonly delivered through inhalation drug therapy in horses include bronchodilators, antiinflammatories, and antimicrobials. Copyright © 2016 Elsevier Inc. All rights reserved.

  9. Bone scintigraphy for horses

    International Nuclear Information System (INIS)

    Jahn, Werner

    2010-01-01

    Scintigraphy (bone scan) is being used approximately since 1980 in the horse under general anaesthesia. With the construction of custom-made overhead gantries for gamma-cameras scintigraphy found widespread entry in big equine referral hospitals for bone-scanning of the standing horse. Indications for the use of a bone scan in the horse are inflammatory alterations in the locomotor apparatus. It is primarily used for diagnosis of lameness of unknown origin, suspect of stress fracture or hairline fracture and for horses with bad riding comfort with suspected painful lesions in the spine. (orig.)

  10. Battle looms over hydroelectric dam relicensing

    International Nuclear Information System (INIS)

    Simpson, J.

    1993-01-01

    Environmental groups, buoyed by support from influential lawmakers, are vowing to change the Federal Energy Regulatory Commission's (FERC's) hydroelectric relicensing procedures. For too long, the groups say, the hydroelectric industry has benefitted from a cozy relationship with the FERC, which has emphasized economic over environmental considerations. The success or failure of the environmentalists agenda will likely prove critical to the hydroelectric industry. With 237 hydroelectric licenses up for renewal this year - the most ever considered by the FERC in one year - and four vacant seats at the Commission, FERC hydro policy appears poised for upheaval. The groups have proposed a multipoint program to address perceived shortcomings in the FERC's hydroelectric relicensing procedures. The program includes recommendations to: Shorten dam licenses (which currently stretch 30 to 50 years) and require the FERC to periodically reevaluate the terms of hydropower licenses; Increase Congressional oversight of the FERC to assure adherence to environmental laws, including the National Environmental Policy Act, which mandates the preparation of environmental impact statements where appropriate; Mandate facilities for upstream and downstream fish passage; Establish a mitigation fund, collectable from dam owners, for river conservation and restoration programs; Promote all alternatives to relicensing projects, including denial of project licenses; and Reassign the FERC's hydropower jurisdiction to another federal agency, such as the Environmental Protection Agency or the Department of the Interior

  11. The little hydro-electricity: the boosting?

    International Nuclear Information System (INIS)

    Brunier, S.; Najac, C.; Roussel, A.M.; Claustre, R; Baril, D.; Marty, D.; Lefevre, P.; Arnould, M.

    2007-01-01

    The hydraulic energy could be easily developed in France to reach the objectives of the european directive on the renewable energies. This development can be assured by the construction of power plants perfectly integrated in their environment and respecting the rivers and assured also by the increase of the capacities of existing power plants as it is allowing by the new regulations. This document presents the place and the capacity of the hydro-electricity in France, the implementing of a green electricity, the existing regulation, the river biological continuation, the ecosystems and the little hydro-electricity and the example of the hydro-electric power plant of Scey-sur-Saone. (A.L.B.)

  12. Aid as Obstacle: Twenty Questions about Our Foreign Aid and the Hungry.

    Science.gov (United States)

    Lappe, Frances Moore; And Others

    Reasons why U.S. foreign aid fails to alleviate hunger and poverty are discussed and a solution to the problem is presented. The United States now channels more foreign aid than ever to the world's poor and hungry through the Agency for International Development, food aid programs, the World Bank, and other multilateral aid agencies, which report…

  13. A brief mindfulness intervention reduces unhealthy eating when hungry, but not the portion size effect

    NARCIS (Netherlands)

    Marchiori, D.R.; Papies, E.K.

    2014-01-01

    Objective: The present research examined the effects of a mindfulness-based intervention to foster healthy eating. Specifically, we tested whether a brief mindfulness manipulation can prevent the portion size effect, and reduce overeating on unhealthy snacks when hungry. Methods: 110 undergraduate

  14. Aquatic biology and hydroelectric power development in New Zealand

    National Research Council Canada - National Science Library

    Henriques, P. R

    1987-01-01

    .... The first section summarizes the country's hydroelectric resources and their utilization. The legal and planning framework associated with hydroelectric power development and the environment is covered in the second section...

  15. The greatest hydroelectric power plant in the world. Itaipu Hydroelectric Power Plant

    International Nuclear Information System (INIS)

    Andonov - Chento, Ilija

    2004-01-01

    Details to demonstrate the size and engineering achievements of one of the world's greatest hydroelectric power plant are given. Principal technical features of construction and operation of the Itaipu Dam are tabulated and discussed

  16. Horse trichinellosis, an unresolved puzzle

    Directory of Open Access Journals (Sweden)

    Pozio E.

    2001-06-01

    Full Text Available In spite of routine controls to detect Trichinella larvae in horse-meat, human infections due to horse-meat consumption continue to occur in France and Italy, The epidemiology of horse trichinellosis since its discovery in 1975 is outlined, addressing the possible modes of natural transmission to horses, the need to develop more sensitive methods for detecting Trichinella larvae in horses, and the economic impact of horse trichinellosis. Investigations of human outbreaks due to horse-meat consumption have implicated single cases of inadequate veterinary controls on horses imported from non-European Union countries. In particular, most cases of human infection have been attributed to horses imported from Eastern Europe, where pig trichinellosis is re-emerging and the main source of infection in horses.

  17. Improvement of hydroelectric power generation using pumped ...

    African Journals Online (AJOL)

    By principle, hydroelectric power generation relies on the law of conservation of energy where kinetic energy that resulted from the movement of the mass of water from the river is translated into electr icity, the quantum of which depends on systemic variables viz: plant efficiency, volumetric water flow through the turbine and ...

  18. improvement of hydroelectric power generation using pumped

    African Journals Online (AJOL)

    HOD

    1, 4 DEPARTMENT OF SYSTEMS ENGINEERING, UNIVERSITY OF LAGOS, AKOKA, YABA, ... pumped storage system for generating hydroelectric power all year round. ... Power supply situation in Nigeria has no doubt ..... (objective functions), criteria for evaluation of control .... adsen H “Para eter esti ation in distributed.

  19. Daily storage management of hydroelectric facilities

    NARCIS (Netherlands)

    Chappin, E.J.L.; Ferrero, M.; Lazzeroni, P.; Lukszo, Z.; Olivero, M.; Repetto, M.

    2012-01-01

    This work presents a management procedure for hydroelectric facilities with daily storage. The water storage gives an additional degree of freedom allowing to shift in time power production when it is more convenient and to work at the maximum efficiency of hydraulic turbine. The management is

  20. What share for hydroelectricity in France?

    International Nuclear Information System (INIS)

    Bongrand, Th.; Bouvier, E.; Francois, M.; Martin, J.M.; Tardieu, B.; Vogien, M.; Cruchon, Ph.; Miquel, J.; Gariel, A.; Levasseur, L.; Mallet, J.P.

    2004-01-01

    This document gathers 10 presentations (articles) given at the 2. meeting on hydroelectricity, held at Grenoble on May 2004. The papers present some examples of realizations in the domain of small-hydropower, the R and D in progress and some recent advances in hydraulic engineering, the safety and quality aspects, and the environmental impacts and sustainable development of hydroelectric power: 1 - examples of small hydropower plants in France and in progress at SOGREAH (T. Bongrand); 2 - the pico-power plants implemented on drinkable water networks (E. Bouvier); 3 - MINI-AQUA: the mini-hydro solution (M. Francois); 4 - Grenoble and the Alpine valley, pole of hydraulic and hydroelectric competences (J.M. Martin); 5 - history and R and D (B. Tardieu); 6 - advances in engineering for a forefront industry (M. Vogien); 7 - improvement of hydraulic safety (P. Cruchon); 8 - a ISO 14001 certification experience in the domain of hydroelectricity (A. Gariel); 9 - the Rhone river development, reserved flow rate and sustainable development (L. Levasseur); 10 - small hydropower: impact and integration (J.P. Mallet). (J.S.)

  1. A brief mindfulness intervention reduces unhealthy eating when hungry, but not the portion size effect.

    Science.gov (United States)

    Marchiori, David; Papies, Esther K

    2014-04-01

    The present research examined the effects of a mindfulness-based intervention to foster healthy eating. Specifically, we tested whether a brief mindfulness manipulation can prevent the portion size effect, and reduce overeating on unhealthy snacks when hungry. 110 undergraduate participants (MAge=20.9±2.3; MBMI=22.3±2.5) were served a small or a large portion of chocolate chip cookies after listening to an audio book or performing a mindfulness exercise (i.e., body scan). Current level of hunger was assessed unobtrusively on a visual analog scale before the eating situation. Calorie intake from chocolate chip cookies. When presented with a large compared to a small portion, participants consumed more cookies (+83kcal). This was not affected by the mindfulness intervention or by hunger. However, while control participants ate more unhealthy food when hungry than when not hungry (+67kcal), participants in the mindfulness condition did not (+1kcal). Findings confirm the prevalence and robustness of the portion size effect and suggest that it may be independent from awareness of internal cues. Prevention strategies may benefit more from targeting awareness of the external environment. However, mindfulness-based interventions may be effective to reduce effects of hunger on unhealthy food consumption. Copyright © 2013 Elsevier Ltd. All rights reserved.

  2. Emissions from hydroelectric reservoirs and comparison of hydroelectricity, natural gas and oil

    International Nuclear Information System (INIS)

    Gagnon, L.; Chamberland, A.

    1993-01-01

    When reservoirs are created, a small fraction of the flooded organic matter decomposes into humic acids, carbon dioxide (CO 2 ), methane (CH 4 ), nitrogen, phosphorus, and other elements. The major greenhouse gases produced are CO 2 and CH 4 . For northern projects, Canadian studies on emissions from hydroelectric reservoirs have reached similar conclusions: Emissions, including methane, are less than 35 kg CO 2 equivalent per MWh. Using a typical project in northern Quebec as the basis for analysis, none of the studies dispute the considerable advantages of hydroelectricity regarding greenhouse gas emissions. Taking into account all components of energy systems, emissions of greenhouse gases from natural-gas power plants are 24 to 26 times greater than emissions from hydroelectric plants. The Freshwater Institute, in an article published in Ambio suggests that emissions from hydroelectric plants could be a significant source of greenhouse gases. This conclusion does not apply to most hydroelectric projects for two reasons: First, the Freshwater Institute's studies concerned flooded peatlands and shallow reservoirs that are not typical of most hydro projects; and second, the Institute analyzed a hydro project with a ratio of flooded area to energy production that is 6 to 10 times higher than typical projects in Canada. 7 refs, 4 tabs

  3. Hydroelectricity - An Answer To Energy Needs

    Energy Technology Data Exchange (ETDEWEB)

    Francois-Xausa, Maryse; Havard, David; Czerwinski, Francois; Teller, Olivier

    2010-09-15

    The energy challenges of the next 30 years appear daunting and, in certain cases, in conflict with one another. Their complexity is such that one solution alone cannot provide a full answer. It is nevertheless equally clear that hydro-electricity, being renewable, proven, highly efficient, storable and with still very significant resource potential, possesses a unique combination of attributes which will aid decision-makers to plan and execute energy development with confidence.

  4. Horse in the Turkmen Culture

    Directory of Open Access Journals (Sweden)

    Tuna BEŞEN DELİCE

    2015-08-01

    Full Text Available Horses have provided speed and mobility for Turkish people in steppes. Through war capability and skil ls of riding horse they were successful against resident communities in different geographies throughout history and when circumstances became difficult they migrated to convenient land riding horses. They benefited from horse's milk and meat as well as it s power and speed. In feast and festivals they compete with each other using horses, even if they played on horseback. This indicates that horses were how important for Turks in the political, civil, economic, social and cultural fields. Horse was located in the center of the lives of Turks throughout history. Such that, robbing a horse conneted was capital offence as well as rebellion, treason, murder, adultery according to the criminal law of the former Turks. Horse still has not lost its importance in t he present Turkish regions, especially Central Asian geography. Horse is so important for Turkmens that horse figure has taken place in the state coat of arms of Turkmenistan and the last sunday in April is celebrated as a feast in Turkmenistan. Ahal - Teke which is most exclusive horse breed of the word is brought up in Turkmenistan. Horse has also an important place in the vocabulary. In this work, it would be determine horse’s important in social and cultural life of Turkmens as following both language and non - language indicators.

  5. Environmental requirements at hydroelectric power plants

    International Nuclear Information System (INIS)

    Cada, G.F.

    1993-01-01

    Hydroelectric power is the most mature and widely implemented of the renewable energy technologies. The energy of flowing water has been used to perform work directly since ancient times, and the use of hydropower turbines to generate electricity traces back to the 19th century. Two commonly used turbine types, the Francis and Kaplan turbines, are essentially refinements of the simple reaction turbine of Hero of Alexandria, dating from about 100 B.C. (NAS 1976). Hydroelectric power production provides over 10% of the net electrical generation in the US, more than petroleum or natural gas and far more than the other renewable energy technologies combined. On a regional basis, hydroelectric power represents 14% of the net electrical power generation in the Rocky Mountain states and nearly 63% along the Pacific Coast. Those states that have the largest percentages of their electricity generated by hydropower (e.g., Idaho, Oregon, Montana, and Washington) also tend to have the lowest average cost of electricity per kilowatt-hour

  6. Polyuria and polydipsia in horses.

    Science.gov (United States)

    McKenzie, Erica C

    2007-12-01

    Polyuria and polydipsia provide a diagnostic challenge for the equine clinician. This article describes the various known causes of polyuria and polydipsia in horses and provides a description of a systematic diagnostic approach for assessing horses with polyuria and polydipsia to delineate the underlying cause. Treatment and management strategies for addressing polyuria and polydipsia in horses are also described.

  7. 75 FR 38800 - Jordan Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis...

    Science.gov (United States)

    2010-07-06

    ... Hydroelectric Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting... following hydroelectric application has been filed with the Commission and is available for public... 13, 2009. d. Applicant: Jordan Hydroelectric Limited Partnership. e. Name of Project: Flannagan...

  8. 78 FR 6319 - Eastern Hydroelectric Corporation; Notice Rejecting Request for Rehearing

    Science.gov (United States)

    2013-01-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7019-068] Eastern... an order amending license Article 401 for Eastern Hydroelectric Corporation's (Eastern Hydroelectric....\\1\\ On January 11, 2013, Eastern Hydroelectric filed a request for rehearing of Commission staff's...

  9. Small hydroelectricity at the low point?

    International Nuclear Information System (INIS)

    Mary, Olivier

    2015-01-01

    Small hydroelectricity displays an interesting potential in France (about 1.000 MW), but, as outlined in this article and despite technological advances, this sector is not growing significantly, notably for regulatory reasons: there is no consensus on the impact of these constructions on the environment. The article also outlines that development costs are always higher. These environmental and economic issues result in a transformation of the sector: old and ageing plants owned by individuals are sold to other actors, forms of deregulation are appearing to support the development. In parallel, the article notices that installations depend on their geographical context, and that it is also possible to produce electricity in plains

  10. Hydroelectric dams need billions for rehab

    International Nuclear Information System (INIS)

    Carr, F.H.; Soast, A.

    1993-01-01

    Many of the Corps of Engineers older hydroelectric dams will require major rehabilitation over the next ten years. Preventive maintenance, repair work, and major rehabilitation of the Corp's hydro dams in inadequate because the revenue generated by sales of electricity, by law, is returned to the Treasury. Most multimillion dollar rehabilitation projects require specific approval for funding by Congress and securing it is a long and difficult process. It is hoped the funding problem will soon be addressed by the Clinton administration. Already, nearly one-sixth of the 2,154 Mw of hydro is unavailable because with hydro units are either out of service or operating at less than full capacity

  11. Sub-Saharan hydroelectric power development potential

    International Nuclear Information System (INIS)

    Lazenby, J.B.C.

    1991-01-01

    Though evidencing a power demand which is amongst the lowest in the world, the sub-Saharan regions of Africa are blessed with an enormous hydroelectric power resource potential, which, if suitably developed and tapped, may become a source of economic electric energy for Europe. With the aid of numerous statistical supply and demand data, this paper surveys the marketing potential of this energy source in Africa. The analysis of future development prospects is carried out with reference to the local socio-economic framework

  12. An Energy Aware Adaptive Sampling Algorithm for Energy Harvesting WSN with Energy Hungry Sensors

    Science.gov (United States)

    Srbinovski, Bruno; Magno, Michele; Edwards-Murphy, Fiona; Pakrashi, Vikram; Popovici, Emanuel

    2016-01-01

    Wireless sensor nodes have a limited power budget, though they are often expected to be functional in the field once deployed for extended periods of time. Therefore, minimization of energy consumption and energy harvesting technology in Wireless Sensor Networks (WSN) are key tools for maximizing network lifetime, and achieving self-sustainability. This paper proposes an energy aware Adaptive Sampling Algorithm (ASA) for WSN with power hungry sensors and harvesting capabilities, an energy management technique that can be implemented on any WSN platform with enough processing power to execute the proposed algorithm. An existing state-of-the-art ASA developed for wireless sensor networks with power hungry sensors is optimized and enhanced to adapt the sampling frequency according to the available energy of the node. The proposed algorithm is evaluated using two in-field testbeds that are supplied by two different energy harvesting sources (solar and wind). Simulation and comparison between the state-of-the-art ASA and the proposed energy aware ASA (EASA) in terms of energy durability are carried out using in-field measured harvested energy (using both wind and solar sources) and power hungry sensors (ultrasonic wind sensor and gas sensors). The simulation results demonstrate that using ASA in combination with an energy aware function on the nodes can drastically increase the lifetime of a WSN node and enable self-sustainability. In fact, the proposed EASA in conjunction with energy harvesting capability can lead towards perpetual WSN operation and significantly outperform the state-of-the-art ASA. PMID:27043559

  13. An Energy Aware Adaptive Sampling Algorithm for Energy Harvesting WSN with Energy Hungry Sensors

    Directory of Open Access Journals (Sweden)

    Bruno Srbinovski

    2016-03-01

    Full Text Available Wireless sensor nodes have a limited power budget, though they are often expected to be functional in the field once deployed for extended periods of time. Therefore, minimization of energy consumption and energy harvesting technology in Wireless Sensor Networks (WSN are key tools for maximizing network lifetime, and achieving self-sustainability. This paper proposes an energy aware Adaptive Sampling Algorithm (ASA for WSN with power hungry sensors and harvesting capabilities, an energy management technique that can be implemented on any WSN platform with enough processing power to execute the proposed algorithm. An existing state-of-the-art ASA developed for wireless sensor networks with power hungry sensors is optimized and enhanced to adapt the sampling frequency according to the available energy of the node. The proposed algorithm is evaluated using two in-field testbeds that are supplied by two different energy harvesting sources (solar and wind. Simulation and comparison between the state-of-the-art ASA and the proposed energy aware ASA (EASA in terms of energy durability are carried out using in-field measured harvested energy (using both wind and solar sources and power hungry sensors (ultrasonic wind sensor and gas sensors. The simulation results demonstrate that using ASA in combination with an energy aware function on the nodes can drastically increase the lifetime of a WSN node and enable self-sustainability. In fact, the proposed EASA in conjunction with energy harvesting capability can lead towards perpetual WSN operation and significantly outperform the state-of-the-art ASA.

  14. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  15. micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    the west region of Cameroon. KEYWORDS: Problems, micro hydroelectric, funds, craftsmen, Cameroon. INTRODUCTION. Energy from Water streaming down the mountains has been exploited since antiquity to replace muscular effort (Bessac, 2000). The perfection of devices used results today in hydroelectric turbines,.

  16. Xenophon on Horses

    Directory of Open Access Journals (Sweden)

    Alenka Cedilnik

    2013-07-01

    Full Text Available Based on Xenophon’s writings on horses, the paper begins with a partial account of his life prior to his decision to join Cyrus, and continues by outlining his attitude to horses, animals with whom he lived in close contact. Except for the period spent campaigning with Cyrus’ Greek mercenaries (401–400 BC, the life of Xenophon remains largely unknown, raising a number of still unanswered questions. While the final answers are probably going to remain obscure, it may be surmised – on the basis of his horse writings as well – that the author came from an affluent family. As an Athenian of substance, he would have been classified as a knight, and since the representatives of this class fought in the Athenian cavalry, it was this combat arm to which he would have belonged. There is no hard and fast evidence that he took an active part in the last years of the Peloponnesian War. However, his fairly detailed account of the Athenian developments following the peace treaty suggests that Xenophon remained in the city during the rule of the Thirty Tyrants, when many residents were obliged to leave, and, as a cavalry mem- ber, actively supported the regime to the end. In fact, Xenophon’s presentation of the contemporary events highlights the cavalry’s role to the extent that it appears to have played a crucial part in defending the city and regime. But despite the cavalry’s support of the Thirty, its members do not seem to have flocked out of Athens in the uncertain conditions which followed the fall of the Thirty and the restoration of democracy. Thus Xenophon’s decision to join Cyrus the Younger’s expedition may have been influenced not by his recent support of the Thirty alone, but also by reasons unknown today. While there is no solid proof of his closer association with horses prior to Cyrus’ expedition, Xenophon’s writing in the Anabasis leaves no doubt that he spent at least the greater part of the campaign on horseback. The

  17. Carbon emission from global hydroelectric reservoirs revisited.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa

    2014-12-01

    Substantial greenhouse gas (GHG) emissions from hydropower reservoirs have been of great concerns recently, yet the significant carbon emitters of drawdown area and reservoir downstream (including spillways and turbines as well as river reaches below dams) have not been included in global carbon budget. Here, we revisit GHG emission from hydropower reservoirs by considering reservoir surface area, drawdown zone and reservoir downstream. Our estimates demonstrate around 301.3 Tg carbon dioxide (CO2)/year and 18.7 Tg methane (CH4)/year from global hydroelectric reservoirs, which are much higher than recent observations. The sum of drawdown and downstream emission, which is generally overlooked, represents 42 % CO2 and 67 % CH4 of the total emissions from hydropower reservoirs. Accordingly, the global average emissions from hydropower are estimated to be 92 g CO2/kWh and 5.7 g CH4/kWh. Nonetheless, global hydroelectricity could currently reduce approximate 2,351 Tg CO2eq/year with respect to fuel fossil plant alternative. The new findings show a substantial revision of carbon emission from the global hydropower reservoirs.

  18. Instream flow needs below peaking hydroelectric projects

    International Nuclear Information System (INIS)

    Milhous, R.T.

    1991-01-01

    This paper reports on a method developed to assist in the determination of instream flow needs below hydroelectric projects operated in a peaking mode. Peaking hydroelectric projects significantly change streamflow over a short period of time; consequently, any instream flow methodology must consider the dual flows associated with peaking projects. The dual flows are the lowest flow and the maximum generation flow of a peaking cycle. The methodology is based on elements of the Physical Habitat Simulation System of the U.S. Fish and Wildlife Service and uses habitat, rather than fish numbers or biomas, as at basic response variable. All aquatic animals are subject to the rapid changes in streamflow which cause rapid swings in habitat quality. Some aquatic organisms are relatively fixed in location in the stream while others can move when flows change. The habitat available from a project operated in peaking mode is considered to be the minimum habitat occurring during a cycle of habitat change. The methodology takes in to consideration that some aquatic animals can move and others cannot move during a peaking cycle

  19. The role of hydroelectric power in energy economy

    International Nuclear Information System (INIS)

    Allet, B.

    1989-01-01

    The state of development and the technical potential of hydroelectric power worldwide, in Europe and in Switzerland are briefly compared with each other. Afterwards, the most important types of hydroelectric power stations and their function in the electricity-distribution network, are put forward. The realistic possibilities of development in Switzerland, up to the year 2025, of each type of hydroelectric power station is judged with regard to the currently valid regulations. The effects of the peoples' initiative - 'towards the salvation of our waters' or for stricter regulations for the protection of water - on the chances of realisation of these possibilities of development are shown. The forseeable decrease in the production of energy by the existing hydroelectric power stations, as a result of the regulation planned for rest water, is judged. Various forecasts for the future quantity of hydroelectric power production in Switzerland are put forward. 6 figs., 7 tabs., 12 refs

  20. Hydraulic potential evaluation for micro - scale hydroelectric generation at Chicamocha River Basin - micro - scale hydroelectric plants

    International Nuclear Information System (INIS)

    Pacheco P, C.M.; Parga C, G.M.

    1995-01-01

    In development of technical and scientific cooperation treaty carried out between INEA (today Ingeominas) and Catholic University of Colombia, was elaborated the program: Potential Evaluation Hydraulic for Small hydroelectric plants; whose purpose is to carry electrical energy service to smaller populations and rural zones to all municipalities of country. To begin the program was selected the corresponding area to Chicamocha River Basin, the one which corresponds to 72 Municipalities of Boyaca and Santander Departments, due to the fact that is had good information area originating from diagnostic elaborated by INDERENA with the objective of formulating the Classification Plan and the Basin Managing. This Thesis consists of: 1. To identify all micro-basins; 2. To analyze energy demand on part of kernels of population seated in the study area; 3. To evaluate energy generating capacity of water currents and 4. As of the obtained results, to propose alternative for small hydroelectric plants design (PCH) according to defined needs

  1. The origin of ambling horses.

    Science.gov (United States)

    Wutke, Saskia; Andersson, Leif; Benecke, Norbert; Sandoval-Castellanos, Edson; Gonzalez, Javier; Hallsson, Jón Hallsteinn; Lõugas, Lembi; Magnell, Ola; Morales-Muniz, Arturo; Orlando, Ludovic; Pálsdóttir, Albína Hulda; Reissmann, Monika; Muñoz-Rodríguez, Mariana B; Ruttkay, Matej; Trinks, Alexandra; Hofreiter, Michael; Ludwig, Arne

    2016-08-08

    Horseback riding is the most fundamental use of domestic horses and has had a huge influence on the development of human societies for millennia. Over time, riding techniques and the style of riding improved. Therefore, horses with the ability to perform comfortable gaits (e.g. ambling or pacing), so-called 'gaited' horses, have been highly valued by humans, especially for long distance travel. Recently, the causative mutation for gaitedness in horses has been linked to a substitution causing a premature stop codon in the DMRT3 gene (DMRT3_Ser301STOP) [1]. In mice, Dmrt3 is expressed in spinal cord interneurons and plays an important role in the development of limb movement coordination [1]. Genotyping the position in 4396 modern horses from 141 breeds revealed that nowadays the mutated allele is distributed worldwide with an especially high frequency in gaited horses and breeds used for harness racing [2]. Here, we examine historic horse remains for the DMRT3 SNP, tracking the origin of gaitedness to Medieval England between 850 and 900 AD. The presence of the corresponding allele in Icelandic horses (9(th)-11(th) century) strongly suggests that ambling horses were brought from the British Isles to Iceland by Norse people. Considering the high frequency of the ambling allele in early Icelandic horses, we believe that Norse settlers selected for this comfortable mode of horse riding soon after arrival. The absence of the allele in samples from continental Europe (including Scandinavia) at this time implies that ambling horses may have spread from Iceland and maybe also the British Isles across the continent at a later date. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Which hydroelectric potential in your region?

    International Nuclear Information System (INIS)

    2011-01-01

    Illustrated by photos, maps, figures and graphs, this Power Point presentation outlines the important remaining potential of hydroelectricity in France: 10.6 TWh. It indicates how this potential has been assessed and calculated. Even if possibilities exist everywhere (either by building new dams or by exploiting existing weirs), four regions present a higher potential for new works: Rhone-Alpes, Midi-Pyrenees, Auvergne, and Provence-Alpes-Cote d'Azur. Maps indicate the concerned rivers and locations in some regions. Such projects which could boost economic local, regional and national development must be designed while taking planning tools into account (notably the climate-air-energy regional schemes), and rules related to river preservation

  3. The adventure of hydroelectricity must continue

    International Nuclear Information System (INIS)

    Gravel, C.

    1997-01-01

    An interview with Andre Caille, president and CEO of Hydro-Quebec was presented. The interview focussed on the hydroelectric potential of Hydro-Quebec and open access to the American wholesale market. Hydro-Quebec has the capability to produce 160 to 170 terawatt hours of energy per year which is enough to meet all of Quebec''s needs and to export 12 to 15 per cent. According to M. Caille, research in the field of superconductivity would significantly benefit Hydro-Quebec, since the utility is responsible for 107,000 kilometers of transmission lines. If transmission line losses along those lines could be reduced, power stations could be built even farther from markets. With respect to pricing, Hydro-Quebec continues to sell electricity at regulated prices in Quebec, however, export prices to the U.S. are market driven

  4. 75 FR 30805 - Gibson Dam Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions...

    Science.gov (United States)

    2010-06-02

    ... Hydroelectric Company, LLC; Notice Soliciting Comments, and Final Terms and Conditions, Recommendations, and Prescriptions May 26, 2010. Take notice that the following hydroelectric application and applicant-prepared..., 2009. d. Applicant: Gibson Dam Hydroelectric Company, LLC. e. Name of Project: Gibson Dam Hydroelectric...

  5. 75 FR 4058 - CRD Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting...

    Science.gov (United States)

    2010-01-26

    ... Hydroelectric, LLC; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: CRD Hydroelectric, LLC. e. Name of Project: Red Rock Hydroelectric Project. f. Location: On the...

  6. 75 FR 71102 - White Mountain Hydroelectric Corp.; Notice of Application for Amendment of License, and...

    Science.gov (United States)

    2010-11-22

    ... Hydroelectric Corp.; Notice of Application for Amendment of License, and Soliciting Comments, Motions To Intervene, and Protests November 12, 2010. Take notice that the following hydroelectric application has been... Hydroelectric Corp. e. Name of Project: Apthorp Hydroelectric Project. f. Location: The project is located on...

  7. Small hydroelectric power plants - shelf goods or tailor-made?

    International Nuclear Information System (INIS)

    Aas, Trond R.

    2002-01-01

    If small hydroelectric power plants are defined to be hydroelectric power plants of up to a few 1000 kW, they should be shelf goods because of cost considerations. Design of small hydroelectric power plants is a many-sided optimization task, on a level with constructing larger hydro power plants. But the budget for a small hydro power plant does not permit any comprehensive evaluations. The most important costs are the one-time costs in the form of investments and the following annual costs in the form of operation and maintenance, and losses. Financing costs are not considered in this article

  8. Hydroelectricity: an asset for a successful energy transition in France

    International Nuclear Information System (INIS)

    Galland, J.C.; Vincent, E.

    2013-01-01

    France's national debate on energy transition has served as a reminder that hydroelectric power plays a significant role in French electricity production. With installed power totalling 25400 MW at end 2012 (the second largest in Europe), France's hydroelectric plants produced 63.8 TWh last year (the third largest in Europe), almost 12% of total output. It is France's second largest means of producing electricity and it represents more than 80% of production of renewable energy. A source of energy developed a long time ago, thus benefiting from technological maturity, hydroelectricity can be produced in large quantity at the heart of France's regions, while also rendering indispensable service for the equilibrium of the French electricity system by compensating the intermittency of other renewable energy sources. The production costs of hydroelectric power are the lowest among all power generation technologies. (authors)

  9. EPRI releases strategic plan for hydroelectric R and D

    International Nuclear Information System (INIS)

    Fickett, A.P.

    1993-01-01

    The Electric Power Research Institute has published a report identifying important research needs and issues in the hydroelectric industry. The report is based on results from a survey of representatives of the 1992 North American hydroelectric community. EPRI conducted the survey to expand upon recommendations of the North American Hydroelectric R ampersand D Forum and to develop EPRI's agenda. The report, an EPRI Strategy for Hydropower Research and Development: Rethinking our Water Resource Management Strategies, outlines an agenda for improving the use of water resources and expanding hydroelectric production at existing dams. It also proposes a new, expanded EPRI strategy within the context of the future energy needs of the US and the North American hydro research agenda

  10. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  11. Power market liberalisation: an opportunity for the hydroelectricity?

    International Nuclear Information System (INIS)

    Loth, P.

    2001-01-01

    This article discusses the future of hydroelectricity in the light of the ongoing liberalisation of the European power market. Compared to fossil electricity, hydroelectricity is a renewable energy source, has a limited impact on the environment, is able to meet strong variations of power demand, but is a little bit more costly. Hydroelectric companies expect the introduction of a quality label for their product as well as the increasing awareness of consumers for environmental aspects to become strong incentives for them to subscribe on green energy despite its higher cost. The cost difference will also be partly reduced by the introduction of a pollution tax on fossil energy sources. Figures on hydroelectricity capacity production, currently and in the near future, in the countries surrounding the Alps are presented. As an example, the business strategy of a Swiss electricity utility is shortly described

  12. Canton hydroelectric project: feasibility study. Final report, appendices

    Energy Technology Data Exchange (ETDEWEB)

    1979-05-01

    These appendices contain legal, environmental, regulatory, technical and economic information used in evaluating the feasibility of redeveloping the hydroelectric power generating facilities at the Upper and Lower Dams of the Farmington River at Collinsville, CT. (LCL)

  13. assessment of slope stability around gilgel gibe-ii hydroelectric

    African Journals Online (AJOL)

    preferred customer

    1 Gilgel-Gibe II Hydroelectric Project, Fofa Town, Ethiopia ... Key words/phrases: Factor of safety, plane failure, slope design, slope .... condition of potential unstable slopes along the road between Fofa town and Gilgel-Gibe Hydro- power II.

  14. The discrete hungry Lotka Volterra system and a new algorithm for computing matrix eigenvalues

    Science.gov (United States)

    Fukuda, Akiko; Ishiwata, Emiko; Iwasaki, Masashi; Nakamura, Yoshimasa

    2009-01-01

    The discrete hungry Lotka-Volterra (dhLV) system is a generalization of the discrete Lotka-Volterra (dLV) system which stands for a prey-predator model in mathematical biology. In this paper, we show that (1) some invariants exist which are expressed by dhLV variables and are independent from the discrete time and (2) a dhLV variable converges to some positive constant or zero as the discrete time becomes sufficiently large. Some characteristic polynomial is then factorized with the help of the dhLV system. The asymptotic behaviour of the dhLV system enables us to design an algorithm for computing complex eigenvalues of a certain band matrix.

  15. The discrete hungry Lotka–Volterra system and a new algorithm for computing matrix eigenvalues

    International Nuclear Information System (INIS)

    Fukuda, Akiko; Ishiwata, Emiko; Iwasaki, Masashi; Nakamura, Yoshimasa

    2009-01-01

    The discrete hungry Lotka–Volterra (dhLV) system is a generalization of the discrete Lotka–Volterra (dLV) system which stands for a prey–predator model in mathematical biology. In this paper, we show that (1) some invariants exist which are expressed by dhLV variables and are independent from the discrete time and (2) a dhLV variable converges to some positive constant or zero as the discrete time becomes sufficiently large. Some characteristic polynomial is then factorized with the help of the dhLV system. The asymptotic behaviour of the dhLV system enables us to design an algorithm for computing complex eigenvalues of a certain band matrix

  16. BLUE GOLD: HYDRO-ELECTRIC RENT IN CANADA

    OpenAIRE

    Glenn Jenkins; RICHARD ZUKER

    1984-01-01

    In this study, an attempt is made to develop estimates of the value of economic rent from production of hydro-electricity. These estimates are made for the year 1979, which is the latest period for which a comprehensive set of data was available at the time this work was undertaken. The estimates are developed for the hydro-electricity generated (or used) by electric utilities in four provinces: Quebec (including Churchill Falls), Ontario, Manitoba and British Columbia. These electric systems...

  17. Systematic Sustainability Assessment (SSA) Tool for Hydroelectric Project in Malaysia

    Science.gov (United States)

    Turan, Faiz Mohd; Johan, Kartina

    2017-08-01

    Sustainably developed and managed hydropower has enormous potential to contribute to global sustainability goals. It is known that hydroelectricity contributing small amounts to greenhouse gas emissions and other atmospheric pollutants. However, developing the remaining hydroelectric potential offers many challenges, and public pressure and expectations on the environmental and social performance of hydroelectric tend to increase over time. This paper aims to develop Systematic Sustainability Assessment (SSA) Tool that promotes and guides more sustainable hydroelectric projects in the context of Malaysia. The proposed SSA tool which not only provide a quality and quantitative report of sustainability performance but also act as Self-Assessment Report (SAR) to provide roadmap to achieve greater level of sustainability in project management for continuous improvement. It is expected to provide a common language that allow government, civil society, financial institutions and the hydroelectric sector to talk about and evaluate sustainability issues. The advantage of SSA tool is it can be used at any stage of hydroelectric development, from the earliest planning stages right through to operation.

  18. Welfare in horse breeding

    DEFF Research Database (Denmark)

    Campbell, M.L.H.; Sandøe, Peter

    2015-01-01

    and identifies areas in which data is lacking. We suggest that all methods of horse breeding are associated with potential welfare problems, but also that the judicious use of ARTs can sometimes help to address those problems. We discuss how negative welfare effects could be identified and limited and how...... positive welfare effects associated with breeding might be maximised. Further studies are needed to establish an evidence base about how stressful or painful various breeding procedures are for the animals involved, and what the lifetime welfare implications of ARTs are for future animal generations....

  19. Balance: Hydroelectricity impacts on energy systems

    International Nuclear Information System (INIS)

    Baptista, V.; Baia, L.; Azevedo, H.

    1997-01-01

    The VALORAGUA (Value of Water in Portuguese) computer model was developed by Electricidade de Portugal (EDP) in order to determine the optimal operation strategy of a mixed hydro-thermal power system with an important share of hydroelectricity generation such as the one of Portugal. The model has become the main tool used by EDP for planning the development and operation of its power system. In recent years, EDP has acquired the ENPEP package and has become acquainted with its use for integrated energy and electricity planning. The main goal of this effort has been to incorporate in EDP's planning procedure an integrated approach for determining the possible role of electricity in meeting the overall requirements for energy of the country, with due account to the impacts (resource requirements and environmental emissions) of alternative energy and electricity systems. This paper concentrates on a comparison of the results of the BALANCE module of ENPEP for the electricity sector against the simulation results provided by VALORAGUA. Suggested improvements to the methodologies in order to overcome the divergences in results from these two models are also advanced in the paper. (author). 15 figs

  20. Economic aspects of hydroelectric power scheme rehabilitation

    International Nuclear Information System (INIS)

    Dupuy, M.

    1991-01-01

    As part of the management of a utility, it is necessary to check, beyond the technical aspect, the economic suitability of deciding whether to perform the maintenance or rehabilitation of an installation. The decision criteria involved are to be found within the framework of the utility's management system itself. After having set out the decision-making process of hydroelectric power station maintenance or rehabilitation, the document goes on to give a description of the economic advantage of such an operation. The latter is determined after having properly defined the overall cost of maintenance or rehabilitation: direct expenses and induced costs, and expected savings: economic performance, short and medium-term reduction of expenses as a result of the profitability and productivity of the rehabilitation. The profitability is calculated as the ratio between the economic balance and the amount of the operation. Productivity means the improvement of the utility's management indicators. The random aspect of savings and a simple method making it possible to integrate them into a calculation is mentioned, as well as the classification and aggregation of various operations of a similar nature that have to come into the budget requirements of the utility. (Author)

  1. Balance: Hydroelectricity impacts on energy systems

    Energy Technology Data Exchange (ETDEWEB)

    Baptista, V; Baia, L; Azevedo, H [Electricidade de Portugal, Porto (Portugal)

    1997-09-01

    The VALORAGUA (Value of Water in Portuguese) computer model was developed by Electricidade de Portugal (EDP) in order to determine the optimal operation strategy of a mixed hydro-thermal power system with an important share of hydroelectricity generation such as the one of Portugal. The model has become the main tool used by EDP for planning the development and operation of its power system. In recent years, EDP has acquired the ENPEP package and has become acquainted with its use for integrated energy and electricity planning. The main goal of this effort has been to incorporate in EDP`s planning procedure an integrated approach for determining the possible role of electricity in meeting the overall requirements for energy of the country, with due account to the impacts (resource requirements and environmental emissions) of alternative energy and electricity systems. This paper concentrates on a comparison of the results of the BALANCE module of ENPEP for the electricity sector against the simulation results provided by VALORAGUA. Suggested improvements to the methodologies in order to overcome the divergences in results from these two models are also advanced in the paper. (author). 15 figs.

  2. Hoopa Valley Small Scale Hydroelectric Feasibility Project

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Miller

    2009-03-22

    This study considered assessing the feasibility of developing small scale hydro-electric power from seven major tributaries within the Hoopa Valley Indian Reservation of Northern California (http://www.hoopa-nsn.gov/). This study pursued the assessment of seven major tributaries of the Reservation that flow into the Trinity River. The feasibility of hydropower on the Hoopa Valley Indian Reservation has real potential for development and many alternative options for project locations, designs, operations and financing. In order to realize this opportunity further will require at least 2-3 years of intense data collection focusing on stream flow measurements at multiple locations in order to quantify real power potential. This also includes on the ground stream gradient surveys, road access planning and grid connectivity to PG&E for sale of electricity. Imperative to this effort is the need for negotiations between the Hoopa Tribal Council and PG&E to take place in order to finalize the power rate the Tribe will receive through any wholesale agreement that utilizes the alternative energy generated on the Reservation.

  3. Hydroelectricity at the crossroad: let us give a new momentum to the first renewable energy. White paper on hydroelectricity

    International Nuclear Information System (INIS)

    2017-01-01

    This publication first indicates some data which illustrate the role, importance and development perspectives of hydroelectricity in terms of energy production and in terms of jobs. It outlines that, due to its high adaptation capacity and flexibility, hydroelectricity is an important factor for territory development, that it has a major role in energy supply safety, in the energy mix, and in decentralised energy production. It proposes an overview of the different types of hydroelectric installations: reservoirs for a flexible production and supply safety, run of river hydro systems for a continuous and renewable energy production, pumped storage power stations for mass storage of electric energy. It proposes an overview of assets of hydroelectric energy: implementation of energy transition on the long term, development of an industrial sector of excellence, a responsible and supportive energy, compatibility between hydroelectricity, biodiversity and water usages. Proposals are then formulated to give electricity a new momentum: a new orientation of national and European policies for a better global consistency, a new orientation of economic choices and tax policy as incentives to maintenance and development of the hydroelectric sector, and a fair compensation of services provided to the electric power system

  4. AHP 47: RAG DRUG: A FAITHFUL HORSE

    Directory of Open Access Journals (Sweden)

    Lcags so lhun 'grub ལྕགས་སོ་ལྷུན་འགྲུབ། (Klu sgrub ཀླུ་སྒྲུབ།

    2017-04-01

    Full Text Available My family had three horses in 2016, but when I was about five years old (2006 we had seven horses. Over time, we sold four horses to people living in other communities. We do not want to sell horses to Chinese and Muslim businessmen because Father says, "They take the horses directly to big slaughterhouses and kill them." Instead, we prefer to sell our livestock, including sheep, yaks, and goats to Tibetans, even though the payment is less. ...

  5. Morphological evolution of the Haflinger horse

    Directory of Open Access Journals (Sweden)

    M. Pasquini

    2011-03-01

    Full Text Available The Haflinger horse has certainly a lot of success, considering its popularity not only in its native region, South Tyrol, but also worldwide. Therefore, for its preservation and mainly for a larger diffusion of these horses, Haflinger horse’ breeders thought it could be useful to change, with an appropriated selection, the functional type, originally a pack-horse and a horse for agricultural work, into a saddle horse for riding purpose (Pagnacco, 1994...

  6. Morphological evolution of the Haflinger horse

    OpenAIRE

    M. Pasquini; S. Rizzi; A. Falaschini

    2011-01-01

    The Haflinger horse has certainly a lot of success, considering its popularity not only in its native region, South Tyrol, but also worldwide. Therefore, for its preservation and mainly for a larger diffusion of these horses, Haflinger horse’ breeders thought it could be useful to change, with an appropriated selection, the functional type, originally a pack-horse and a horse for agricultural work, into a saddle horse for riding purpose (Pagnacco, 1994)...

  7. The impact of climate change on hydro-electricity generation

    International Nuclear Information System (INIS)

    Musy, A.; Music, B.; Roy, R.

    2008-01-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs

  8. The impact of climate change on hydro-electricity generation

    Energy Technology Data Exchange (ETDEWEB)

    Musy, A.; Music, B.; Roy, R. [Ouranos, Montreal, PQ (Canada)

    2008-07-01

    Hydroelectricity is a clean and renewable energy source for many countries, and is expected to play an important role in future energy supplies. However, the impact of climatic change on hydroelectricity resources is not yet understood. This study provided a critical review of current methods used to determine the potential impacts of climatic change on hydroelectric power production. General circulation models (GCMs) are used to predict future climate conditions under various greenhouse gas (GHG) emissions scenarios. Statistical techniques are then used to down-scale GCM outputs to the appropriate scales needed for hydrological models, which are then used to simulate the effects of climatic change at regional and local scales. Outputs from the models are then used to develop water management models for hydroelectric power production. Observed linear trends in annual precipitation during the twentieth century were provided. The theoretical advantages and disadvantages of various modelling techniques were reviewed. Risk assessment strategies for Hydro-Quebec were also outlined and results of the study will be used to guide research programs for the hydroelectric power industry. refs., tabs., figs.

  9. Horse Shampoo for Human Hair?

    Directory of Open Access Journals (Sweden)

    Chiriac Anca

    2016-12-01

    Full Text Available Introduction: Lately, a new idea has caught the attention of young people of both genders, being debated in consultation rooms, during classes, and especially on social media: is using horse shampoo for human hair wrong or not?

  10. Trojan Horse Method: Recent Experiments

    International Nuclear Information System (INIS)

    Cherubini, S.; Spitaleri, C.; Crucilla, V.; Gulino, M.; La Cognata, M.; Lamia, L.; Pizzone, R. G.; Romano, S.; Tudisco, S.; Tumino, A.; Mukhamedzhanov, A.; Trache, L.; Tribble, R.; Rolfs, C.; Typel, S.

    2006-01-01

    The Trojan Horse Method allows for the measurements of cross sections in nuclear reactions between charged particles at astrophysical energies. The basic features of the method are discussed and recent applications are presented

  11. Hydroelectricity and territories; L'hydroelectricite et les territoires

    Energy Technology Data Exchange (ETDEWEB)

    Rocq, Sylvie [Syndicat Mixte d' Etude et d' Amenagement de la Garonne, 61, rue Pierre Cazeneuve 31200 Toulouse (France); Moor, Jean-Francois; Comeau, Aline [Agence de l' eau Adour-Garonne, 90 rue de Feretra 31078 Toulouse Cedex 4 (France); Thomas, Michael [Etablissement Public Territorial du Bassin de la Dordogne - Epidor, Le Tournepique, 24250 Castelnaud-la-Chapelle (France)

    2012-01-15

    On our river territories, the development of renewable energy and the restoration of the quality of the aquatic ecosystems both illustrate the need to reconcile the different usages of water resources while still guaranteeing proper functioning of the ecosystems. Hydroelectricity is the crux of the problem. Because of its mountainous hydrographic network and its favourable hydrology, the Adour-Garonne basin witnessed large-scale development of its hydroelectric potential throughout the 20. century. Approaching the question of hydroelectricity from the point of view of the river territories puts all the challenges facing them into their true perspective. Two distinct examples in the Adour-Garonne basin illustrate the partnership between the Water Agency and the local authorities in the Garonne and Dordogne basins: on the Garonne River, reconciling water usages with the maintenance of adequate water levels at times of drought; on the Dordogne River, reducing the impact of the hydro-peaking. (authors)

  12. Mitigation and recovery of methane emissions from tropical hydroelectric dams

    Energy Technology Data Exchange (ETDEWEB)

    Bambace, L.A.W.; Ramos, F.M.; Lima, I.B.T.; Rosa, R.R. [Instituto Nacional de Pesquisas Espaciais (INPE), Sao Jose dos Campos (Brazil)

    2007-06-15

    Tropical hydroelectric reservoirs generally constitute an appreciable source of methane to the atmosphere. This paper proposes simple mitigation and recovery procedures to substantially reduce atmospheric methane emissions from hydroelectric reservoirs. We aim at transforming existing methane stocks of tropical reservoirs into a clean, renewable energy source. The recovered gas methane may be pumped to large consuming centers, stocked locally and burned in gas turbines to generate electricity during high demand periods, or even purified for transport applications. Our simulations show that the use of biogenic methane may increase considerably the energy supply in countries like Brazil. As a result, it would be possible to reduce the need of additional hydroelectric dams, protecting important pristine biomes, and avoiding the resettlement of villages and indigenous reserves. (author)

  13. Miksova hydro-electric power plant is awaiting the fortieths

    International Nuclear Information System (INIS)

    Regula, E.

    2004-01-01

    In this paper the history of cascade of the Miksova hydro-electric power plants (HEPP, in the Slovak Republic) is described. This cascade of power plants consists of the following hydro-electric power plant: Hricov HEPP, Miksova HEPP, Povazska Bystrica HEPP and Nosice HEPP. In the Miksova HEPP are installed three turbo-sets with Kaplan turbine from the CKD Blansko and with synchronous hydro-alternator. Synchronous hydroelectric alternators have maximal output by 31.2 MW. Their installed output is together 93.6 MW and projected production of electric energy is 207 GWh annually. To the end 2003 Miksova HEPP during 40 years has produced together 7,161,342 MWh of electric energy

  14. Horse domestication and conservation genetics of Przewalski's horse inferred from sex chromosomal and autosomal sequences.

    Science.gov (United States)

    Lau, Allison N; Peng, Lei; Goto, Hiroki; Chemnick, Leona; Ryder, Oliver A; Makova, Kateryna D

    2009-01-01

    Despite their ability to interbreed and produce fertile offspring, there is continued disagreement about the genetic relationship of the domestic horse (Equus caballus) to its endangered wild relative, Przewalski's horse (Equus przewalskii). Analyses have differed as to whether or not Przewalski's horse is placed phylogenetically as a separate sister group to domestic horses. Because Przewalski's horse and domestic horse are so closely related, genetic data can also be used to infer domestication-specific differences between the two. To investigate the genetic relationship of Przewalski's horse to the domestic horse and to address whether evolution of the domestic horse is driven by males or females, five homologous introns (a total of approximately 3 kb) were sequenced on the X and Y chromosomes in two Przewalski's horses and three breeds of domestic horses: Arabian horse, Mongolian domestic horse, and Dartmoor pony. Five autosomal introns (a total of approximately 6 kb) were sequenced for these horses as well. The sequences of sex chromosomal and autosomal introns were used to determine nucleotide diversity and the forces driving evolution in these species. As a result, X chromosomal and autosomal data do not place Przewalski's horses in a separate clade within phylogenetic trees for horses, suggesting a close relationship between domestic and Przewalski's horses. It was also found that there was a lack of nucleotide diversity on the Y chromosome and higher nucleotide diversity than expected on the X chromosome in domestic horses as compared with the Y chromosome and autosomes. This supports the hypothesis that very few male horses along with numerous female horses founded the various domestic horse breeds. Patterns of nucleotide diversity among different types of chromosomes were distinct for Przewalski's in contrast to domestic horses, supporting unique evolutionary histories of the two species.

  15. Hydroelectric resources. Inventory of the hydroelectric resources of the Atlantic Coast

    International Nuclear Information System (INIS)

    Arrieta, R.M.; Insignares R, G.

    1987-01-01

    Basically this report gives a clear vision of the possibilities of energy development in the Colombian Atlantic Coast, projects that contemplate a wide range as soon as it refers that is to say to generation ranges, they have been identified at level macro in the Sierra Nevada region and the Peasant with a profitable hydroelectric potential of 631 MW; in the Sinu region, 3 projects were identified with a profitable potential of 1186 MW and in the Magdalena region, was also identified 3 projects whose profitable potential is of 475 MW. At level micro, the carried out studies defined in the same previous regions a series of projects that they necessarily reach the megawatt. The report contains a description of each one of the identified projects and its current situation. It also presents a review of the makers of turbines that exist at the moment in the country

  16. The earliest horse harnessing and milking.

    Science.gov (United States)

    Outram, Alan K; Stear, Natalie A; Bendrey, Robin; Olsen, Sandra; Kasparov, Alexei; Zaibert, Victor; Thorpe, Nick; Evershed, Richard P

    2009-03-06

    Horse domestication revolutionized transport, communications, and warfare in prehistory, yet the identification of early domestication processes has been problematic. Here, we present three independent lines of evidence demonstrating domestication in the Eneolithic Botai Culture of Kazakhstan, dating to about 3500 B.C.E. Metrical analysis of horse metacarpals shows that Botai horses resemble Bronze Age domestic horses rather than Paleolithic wild horses from the same region. Pathological characteristics indicate that some Botai horses were bridled, perhaps ridden. Organic residue analysis, using delta13C and deltaD values of fatty acids, reveals processing of mare's milk and carcass products in ceramics, indicating a developed domestic economy encompassing secondary products.

  17. Flavour-flavour learning occurs automatically and only in hungry participants.

    Science.gov (United States)

    Brunstrom, Jeffrey M; Fletcher, Hollie Z

    2008-01-28

    A novel flavour may become liked if it is presented repeatedly and in combination with a second flavour that is already liked. Conceptually, this 'flavour-flavour learning' is important, because it can account for many of our everyday food and flavour preferences. However, relatively little is known about the underlying process because learning paradigms have lacked reliability. Based on previous research we explored whether learning is determined by three variables; i) hunger state, ii) demand and contingency awareness, and iii) dietary restraint. Participants (male n=15/female n=15) consumed three different and novel-tasting fruit teas. One of the teas had a non-caloric sweetener added (CS+) and two were unsweetened (CS-). Before and after this training the participants ranked their preference for unsweetened versions of the three teas. We found that the training increased preference for the CS+ relative to the CS- teas. However, this effect was only found in hungry participants. We also found little evidence that learning was related to whether the participants could identify (recognition test) the specific tea that had been sweetened during training, suggesting that the underlying process is automatic and it operates outside conscious awareness. Learning was not predicted by dietary restraint (measured using the DEBQ-R scale). Together, these findings provide further evidence for a linkage between flavour-flavour learning and flavour-nutrient learning.

  18. Neuropeptide Y enhances olfactory mucosa responses to odorant in hungry rats.

    Science.gov (United States)

    Negroni, Julia; Meunier, Nicolas; Monnerie, Régine; Salesse, Roland; Baly, Christine; Caillol, Monique; Congar, Patrice

    2012-01-01

    Neuropeptide Y (NPY) plays an important role in regulating appetite and hunger in vertebrates. In the hypothalamus, NPY stimulates food intake under the control of the nutritional status. Previous studies have shown the presence of NPY and receptors in rodent olfactory system, and suggested a neuroproliferative role. Interestingly, NPY was also shown to directly modulate olfactory responses evoked by a food-related odorant in hungry axolotls. We have recently demonstrated that another nutritional cue, insulin, modulates the odorant responses of the rat olfactory mucosa (OM). Therefore, the aim of the present study was to investigate the potential effect of NPY on rat OM responses to odorants, in relation to the animal's nutritional state. We measured the potential NPY modulation of OM responses to odorant, using electro-olfactogram (EOG) recordings, in fed and fasted adult rats. NPY application significantly and transiently increased EOG amplitudes in fasted but not in fed rats. The effects of specific NPY-receptor agonists were similarly quantified, showing that NPY operated mainly through Y1 receptors. These receptors appeared as heterogeneously expressed by olfactory neurons in the OM, and western blot analysis showed that they were overexpressed in fasted rats. These data provide the first evidence that NPY modulates the initial events of odorant detection in the rat OM. Because this modulation depends on the nutritional status of the animal, and is ascribed to NPY, the most potent orexigenic peptide in the central nervous system, it evidences a strong supplementary physiological link between olfaction and nutritional processes.

  19. At the Table with Hungry Ghosts: Intimate Borderwork in Mexico City

    Directory of Open Access Journals (Sweden)

    Jean Duruz

    2011-09-01

    Full Text Available This article focuses on the project of sustaining cultural diversity within global cities’ intimate spaces. Specifically, it sketches the culinary histories of an Anglo-Australian woman (who, in 1968, settled permanently in Mexico and her male partner (who grew up in Mexico; his mother Mexican, his father Cantonese. Drawing on the tools of ‘borderwork’ (Hodge and O’Carroll, the argument positions culturally diverse landscapes of ‘Sydney’, ‘China’ and ‘Mexico City’ as distinct yet overlapping geographies. Meanwhile, analysis of curious moments in the couple’s intersecting histories contributes much fluidity to this cartography. In the process, a company of hungry ghosts appears at the dinner table – ghosts of diversity, diaspora and cosmopolitanism; nostalgia and memory; gender and ethnicity; home and belonging. The article concludes that even when borderwork is conducted amiably behind closed doors, it relies on contradictions for cultural sustenance. At the same time, its tensions resonate with possibilities for creative practice.

  20. [Hygienic characteristics of work conditions at large Hydroelectric Power Plants with mechanization and automatization].

    Science.gov (United States)

    Iakimova, L D

    1997-01-01

    The article touches upon hygienic problems associated with mechanization and automation of major hydroelectric power stations. The authors present criteria to evaluate work conditions of the main occupations participating in the technologic process of hydroelectric power stations.

  1. 75 FR 66077 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental...

    Science.gov (United States)

    2010-10-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Supplemental Environmental Assessment... Energy Projects has reviewed the application for an original license for the Mahoning Creek Hydroelectric...

  2. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  3. Social and environmental impacts of the James Bay hydroelectric project

    International Nuclear Information System (INIS)

    Hornig, J.F.

    1999-01-01

    The book, which is an analysis and not an advocacy, examines the anatomy of the controversy that has swirled around the James Bay project - the La Grande and Great Whale projects combined - from the 1970s to the 1990s, and seeks, in the process, to determine whether there are lessons that can be learned from such an analysis that are applicable to other cases as well as to James Bay itself. The contributors are interested, at one and the same time, in finding ways to integrate the knowledge of natural scientists and social scientists to deepen the understanding of human/environment relations and to link science and policy to encourage a productive dialogue between practitioners and scholars in this increasingly important area of inquiry. The contributor's papers include the following: introduction to the issues; hydroelectric power development at James Bay: establishing a frame of reference; James Bay: environmental considerations for building large hydroelectric dams and reservoirs in Quebec; elevated mercury in fish as a result of the James Bay hydroelectric power development: perception and reality; the Cree people of James Bay: assessing the social impacts of hydroelectric dams and reservoirs; culture, social change, and Cree opposition to the James Bay hydroelectric development; and the impact of James Bay hydroelectric development on the art and craft of the James Bay Cree. The authors of the volume have attempted to stand back and examine just a few of these issues from the perspective of a variety of disciplines, and their purpose is to inform and stimulate thoughtful consideration by providing an overall perspective that might might serve to broaden the context in which specific issues can be debated. refs., 3 tabs., 5 figs

  4. Report on the renewal of the hydro-electric concessions

    International Nuclear Information System (INIS)

    2006-11-01

    The administrative procedures of the renewable of the hydro-electric concessions in France is a real problem, leading to too long time of the case files examination. This mission aimed to identify the technical and financial criteria on which the decision maker will base his choice to give the concessions renewal. This report exposes the evaluation and the recommendations of the mission. The first part establishes an evaluation of the situation of the hydro-electric concessions and the today renewal procedures. The second part presents a analysis of this situation and the recommendations. The last part brings the conclusions. (A.L.B.)

  5. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  6. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  7. 76 FR 75543 - Castle Creek Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing...

    Science.gov (United States)

    2011-12-02

    ... Hydroelectric Project; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments... (FPA), proposing to study the feasibility of the Castle Creek Hydroelectric Project to be located on... be located adjacent to the original hydroelectric plant, with a single shaft Pelton turbine...

  8. 76 FR 76156 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Federal Power Act (FPA), proposing to study the feasibility of the Scooteney Outlet Drop Hydroelectric..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  9. 75 FR 63450 - Wilkesboro Hydroelectric Company; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-10-15

    ... Hydroelectric Company; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  10. 77 FR 7143 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-10

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. 46A Wasteway Hydroelectric Project, to be located on the P.E. 46A...

  11. 78 FR 35630 - Martin Dam Hydroelectric Project; Notice of Availability of the Draft Environmental Impact...

    Science.gov (United States)

    2013-06-13

    ... Hydroelectric Project; Notice of Availability of the Draft Environmental Impact Statement for the Martin Dam Hydroelectric Project and Intention To Hold Public Meetings In accordance with the National Environmental Policy... the Martin Dam Hydroelectric Project (FERC No. 349), located on the Tallapoosa River in Tallapoosa...

  12. 75 FR 77862 - FFP Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit...

    Science.gov (United States)

    2010-12-14

    ... Missouri 16, LLC, Solia 9 Hydroelectric, LLC; Notice of Competing Preliminary Permit Applications Accepted.... On August 6, 2010, FFP Missouri 16, LLC (FFP) and Solia 9 Hydroelectric, LLC filed preliminary permit...-2822. Solia 9 Hydroelectric's proposed Lock and Dam 15 Hydropower Project (Project No. 13827-000) would...

  13. 75 FR 6371 - Jordan Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2010-02-09

    ... Hydroelectric Limited Partnership; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests February 2, 2010. Take notice that the following hydroelectric application has been filed... License b. Project No.: P-12740-003 c. Date filed: July 13, 2009 d. Applicant: Jordan Hydroelectric...

  14. 75 FR 37790 - Mahoning Creek Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental...

    Science.gov (United States)

    2010-06-30

    ... Hydroelectric Company, LLC; Notice of Intent To Issue a Supplemental Environmental Assessment for the Proposed Mahoning Creek Hydroelectric Project June 23, 2010. On March 23, 2010, Commission staff issued an Environmental Assessment (EA) for the proposed Mahoning Creek Hydroelectric Project. On April 22, 2010, the U.S...

  15. 75 FR 35020 - Wilkesboro Hydroelectric Company, LLC; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2010-06-21

    ... Hydroelectric Company, LLC; Notice Soliciting Scoping Comments June 15, 2010 Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of.... Applicant: Wilkesboro Hydroelectric Company, LLC. e. Name of Project: W. Kerr Scott Hydropower Project. f...

  16. 18 CFR 420.51 - Hydroelectric power plant water use charges.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Hydroelectric power... BASIN COMMISSION ADMINISTRATIVE MANUAL BASIN REGULATIONS-WATER SUPPLY CHARGES Hydroelectric Power Water Use Charges § 420.51 Hydroelectric power plant water use charges. (a) Annual base charges. Owners of...

  17. 76 FR 76153 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2011-12-06

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and... Hydroelectric Project (Scooteney Inlet Project or project) to be located on the Potholes East Canal, which is an..., Grand Coulee Project Hydroelectric Authority, P.O. Box 219, Ephrata, WA 98823; phone: (509) 754-2227...

  18. 76 FR 57729 - Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final...

    Science.gov (United States)

    2011-09-16

    ...-015] Boundary Hydroelectric Project; Sullivan Creek Project; Notice of Availability of the Final Environmental Impact Statement for the Relicensing of the Boundary Hydroelectric Project and the Surrender of... reviewed the applications for license for the Boundary Hydroelectric Project (FERC No. 2144-38), and the...

  19. 77 FR 7574 - Grand Coulee Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted...

    Science.gov (United States)

    2012-02-13

    ... Project Hydroelectric Authority; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments and Motions To Intervene On January 13, 2012, the Grand Coulee Project Hydroelectric... study the feasibility of the P.E. Scooteney Wasteway Hydroelectric Project, to be located on the P.E...

  20. 78 FR 5798 - Ceresco Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Science.gov (United States)

    2013-01-28

    ... Hydroelectric Dam, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications On October 19, 2012, Ceresco Hydroelectric Dam, LLC...), proposing to study the feasibility of the Ceresco Hydroelectric Project (Ceresco Project or project) to be...

  1. 75 FR 352 - Enloe Hydroelectric Project; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2010-01-05

    ... Hydroelectric Project; Notice of Application Ready for Environmental Analysis and Soliciting Comments... hydroelectric application has been filed with the Commission and is available for public inspection. a. Type of... Utility District No. 1 of Okanogan County. e. Name of Project: Enloe Hydroelectric Project. f. Location...

  2. Estimation of free-flowingmicro hydroelectric power stations in Krasnoyarsk region

    OpenAIRE

    Kachina, E.; Botcharova, E.

    2010-01-01

    The external factors defining expediency of using micro hydroelectric power stations are considered. Exploration of areas of Krasnoyarsk region, which are suitable for usage of micro hydroelectric power stations is carried out. The market of primary real small hydroelectric engineering in Krasnoyarsk region is defined.

  3. 76 FR 62802 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-10-11

    ... Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National...,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch Potomac River in..., Washington, DC 20426. Please affix ``Jennings Randolph Hydroelectric Project No. 12715-003'' to all comments...

  4. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-08-03

    ... Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment In accordance with the... for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the Pound..., NE., Room 1-A, Washington, DC 20426. Please affix ``Flannagan Hydroelectric Project No. 12740-003...

  5. 76 FR 49462 - Newfound Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License...

    Science.gov (United States)

    2011-08-10

    ... Hydroelectric Company, KTZ Hydro, LLC; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On July 25, 2011, Newfound Hydroelectric Company (transferor) and KTZ Hydro, LLC (transferee) filed an application for transfer of license for the Newfound Hydroelectric Project...

  6. 78 FR 39725 - Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a Programmatic...

    Science.gov (United States)

    2013-07-02

    ...-001--Mississippi] Grenada Lake Hydroelectric Project; Notice Of Proposed Restricted Service List for a... license for the proposed Grenada Lake Hydroelectric Project No. 13702. The Programmatic Agreement, when... Grenada Lake Hydroelectric Project, the U.S. Army Corps of Engineers, the Choctaw Nation of Oklahoma, the...

  7. 76 FR 72196 - CRD Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for...

    Science.gov (United States)

    2011-11-22

    ... Hydroelectric LLC; Western Minnesota Municipal Power Agency; Notice of Application for Transfer of License, and Soliciting Comments and Motions To Intervene On October 14, 2011, CRD Hydroelectric LLC (transferor) and... Red Rock Hydroelectric Project, No. 12576, located on the Des Monies River in Marion County, Iowa...

  8. 75 FR 22122 - Gibson Dam Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting...

    Science.gov (United States)

    2010-04-27

    ... Hydroelectric Company, LLC; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests April 20, 2010. Take notice that the following hydroelectric application has been filed with the.... Project No.: P-12478-003. c. Date filed: August 28, 2009. d. Applicant: Gibson Dam Hydroelectric Company...

  9. 78 FR 48670 - Rivermill Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-08-09

    ... Hydroelectric, Inc., New Hampshire Hydro Associates; Notice of Transfer of Exemption August 5, 2013. 1. By letter filed July 19, 2013, Rivermill Hydroelectric, Inc. and New Hampshire Hydro Associates informed the... Project, FERC No. 9403. All correspondence should be forwarded to Rivermill Hydroelectric, Inc., c/o Essex...

  10. 75 FR 19989 - Final Environmental Impact Statement for Drought Management Planning at the Kerr Hydroelectric...

    Science.gov (United States)

    2010-04-16

    ... Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake, MT AGENCY: Bureau of Indian... Impact Statement (FEIS) for Drought Management Planning at the Kerr Hydroelectric Project, Flathead Lake... drought management planning at the Kerr Hydroelectric Project no sooner than 30 days following the...

  11. Transpalpebral eye enucleation in the standing horse

    DEFF Research Database (Denmark)

    Christophersen, Mogens Teken

    Transpalpebral eye enucleation in the standing horse. The Nordic Equine Veterinary Conference, Proceedings, Copenhagen. Denmark. Nov. 2011.......Transpalpebral eye enucleation in the standing horse. The Nordic Equine Veterinary Conference, Proceedings, Copenhagen. Denmark. Nov. 2011....

  12. Four Legged Healers: Horse Culture as Medicine

    Science.gov (United States)

    White Plume, Jessica

    2016-01-01

    For tribal communities to overcome the health disparities that plague them, they need to honor Indigenous healthcare paradigms. The Horse Nation Initiative at Nueta Hidatsa Sahnish College embraces the people's historical connection to the horse as an avenue to wellness.

  13. Horse Husbandry and Preventive Health Practices in Australia: An Online Survey of Horse Guardians.

    Science.gov (United States)

    Thompson, Kirrilly R; Clarkson, Larissa; Riley, Christopher B; van den Berg, Mariette

    2018-02-08

    Little is known about the horse health management practices of Australian horse caregivers (owners). This article presents findings from a convenience sample of 505 horse owners who participated in an online survey. No large-scale welfare issues were identified, but there were some areas of potential concern, including owners who did not regularly deworm their horses (4%), a lack of strategic parasite control (3.1%), and a lack of regular dental care (11%). Several participants did not have their horse's hooves regularly shod or trimmed (2%), and 14% had an unqualified person maintain their horse's hooves. One in five owners (19%) did not vaccinate their horses against tetanus. The findings are discussed in relation to current Australian horse health guidelines and traditional sources of horse health information, together with recommendations for providing horse owners with relevant information in relevant forms.

  14. Periorbital skull fractures in five horses

    International Nuclear Information System (INIS)

    Caron, J.P.; Barber, S.M.; Bailey, J.V.; Fretz, P.B.; Pharr, J.W.

    1986-01-01

    Periorbital skull fractures were diagnosed in 5 horses, and were associated with ophthalmic complications including corneal ulceration, uveitis, and entrapment of the eye by retrobulbar bone fragments. Physical examination was of greater diagnostic use than radiography. Surgical repair was performed on all horses and was associated with a more favorable postoperative appearance in horses treated acutely; however, the cosmetic results were considered acceptable in all horses. Major postoperative complications were not observed

  15. Paediatric horse-related trauma.

    Science.gov (United States)

    Theodore, Jane E; Theodore, Sigrid G; Stockton, Kellie A; Kimble, Roy M

    2017-06-01

    This retrospective cohort study reported on the epidemiology of horse-related injuries for patients presenting to the only tertiary paediatric trauma hospital in Queensland. The secondary outcome was to examine the use of helmets and adult supervision. Traumatic brain injury (TBI) was examined in relation to helmet use. Morbidity and mortality were also recorded. Included were all patients presenting with any horse-related trauma to the Royal Children's Hospital in Brisbane from January 2008 to August 2014. Data were retrospectively collected on patient demographics, hospital length of stay (LOS), mechanism of injury (MOI), safety precautions taken, diagnoses and surgical procedures performed. Included in the analysis were 187 incidents involving 171 patients. Most patients were aged 12-14 years (36.9%) and female (84.5%). The most common MOI were falls while riding horses (97.1%). Mild TBI (24.6%) and upper limb fractures (20.9%) were common injuries sustained. Patients who wore helmets had significantly reduced hospital LOS and severity of TBI when compared with those who did not wear helmets (P horses, in addition to being a compulsory requirement whilst horse riding. Prompts in documentation may assist doctors to record the use of safety attire and adult supervision. This will allow future studies to further investigate these factors in relation to clinical outcomes. © 2017 Paediatrics and Child Health Division (The Royal Australasian College of Physicians).

  16. Fish entrainment and mortality at the French Landing Hydroelectric Powerhouse

    International Nuclear Information System (INIS)

    Sundquist, M.J.

    1991-01-01

    This paper is a case study which explains the fish mortality study performed and results obtained at an existing hydroelectric powerhouse in Michigan. Undertaken in 1989 and 1990, this study provides data for determining effects of turbine passage on area fish

  17. Micro hydroelectric power plant development in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to characterise the state of ten Micro Hydroelectric Power Plants (MHPPs) installed in the west region of Cameroon, in preparation for their modernization. The work was carried out between January 2006 and December 2008. Each site was visited at least once a month. During these ...

  18. Hydroelectric project at Angliers : Investigation and public hearing report

    International Nuclear Information System (INIS)

    Girard, S.; Bouchard, B.

    2003-08-01

    Public hearings were held by the Bureau d'audiences publiques sur l'environnement concerning a proposed hydroelectric development project at Angliers, Quebec. The proposed hydroelectric plant is to be located at the outlet of the Des Quinze reservoir in the Temiscamingue region (northwest of the province). The site is within the municipality of Angliers, approximately 130 kilometres south of Rouyn-Noranda. The project will exploit the hydroelectric potential of the Ottawa River through a dam at Des Quinze reservoir, which is currently the property of the federal government. During the hearings, several issues were raised, and various topics examined. The political and administrative framework was reviewed, as well as the integration of the project within the community. The impacts, environmental as well as economic, were discussed. After careful examination of all the information, the Commission concluded that the hydroelectric project at Angliers was justified and acceptable from an environmental perspective. The expected economic impact on the community was an essential aspect in determining if the project was acceptable. refs., 4 figs

  19. Climate change impacts on high-elevation hydroelectricity in California

    Science.gov (United States)

    Madani, Kaveh; Guégan, Marion; Uvo, Cintia B.

    2014-03-01

    While only about 30% of California's usable water storage capacity lies at higher elevations, high-elevation (above 300 m) hydropower units generate, on average, 74% of California's in-state hydroelectricity. In general, high-elevation plants have small man-made reservoirs and rely mainly on snowpack. Their low built-in storage capacity is a concern with regard to climate warming. Snowmelt is expected to shift to earlier in the year, and the system may not be able to store sufficient water for release in high-demand periods. Previous studies have explored the climate warming effects on California's high-elevation hydropower by focusing on the supply side (exploring the effects of hydrological changes on generation and revenues) ignoring the warming effects on hydroelectricity demand and pricing. This study extends the previous work by simultaneous consideration of climate change effects on high-elevation hydropower supply and pricing in California. The California's Energy-Based Hydropower Optimization Model (EBHOM 2.0) is applied to evaluate the adaptability of California's high-elevation hydropower system to climate warming, considering the warming effects on hydroelectricity supply and pricing. The model's results relative to energy generation, energy spills, reservoir energy storage, and average shadow prices of energy generation and storage capacity expansion are examined and discussed. These results are compared with previous studies to emphasize the need to consider climate change effects on hydroelectricity demand and pricing when exploring the effects of climate change on hydropower operations.

  20. Esophageal Dysfunction in Friesian Horses: Morphological Features

    NARCIS (Netherlands)

    Ploeg, M.; Grone, A.; Saey, V.; Bruijn, de C.M.; Back, W.; Weeren, van P.R.; Scheideman, W.; Picavet, T.; Ducro, B.J.; Wijnberg, I.; Delesalle, C.

    2015-01-01

    Megaesophagus appears to be more common in Friesian horses than in other breeds. A prevalence of approximately 2% was observed among Friesian horses presented to the Wolvega Equine Clinic and the Utrecht University Equine Clinic. In this study, morphologic changes in the esophagi of Friesian horses

  1. Lyme neuroborreliosis in 2 horses.

    Science.gov (United States)

    Imai, D M; Barr, B C; Daft, B; Bertone, J J; Feng, S; Hodzic, E; Johnston, J M; Olsen, K J; Barthold, S W

    2011-11-01

    Lyme neuroborreliosis--characterized as chronic, necrosuppurative to nonsuppurative, perivascular to diffuse meningoradiculoneuritis--was diagnosed in 2 horses with progressive neurologic disease. In 1 horse, Borrelia burgdorferi sensu stricto was identified by polymerase chain reaction amplification of B burgdorferi sensu stricto-specific gene targets (ospA, ospC, flaB, dbpA, arp). Highest spirochetal burdens were in tissues with inflammation, including spinal cord, muscle, and joint capsule. Sequence analysis of ospA, ospC, and flaB revealed 99.9% sequence identity to the respective genes in B burgdorferi strain 297, an isolate from a human case of neuroborreliosis. In both horses, spirochetes were visualized in affected tissues with Steiner silver impregnation and by immunohistochemistry, predominantly within the dense collagenous tissue of the dura mater and leptomeninges.

  2. Obstacles to hydroelectric power. VDI conference on chances of hydroelectric power - conservation and environmental protection in conflict

    International Nuclear Information System (INIS)

    Sauer, H.D.

    1994-01-01

    Hydroelectric power is one of the most efficient energy sources and presents no CO 2 pollution problem, but there are obstacles as was shown at a VDI conference. Regional landscape conservation interests are in conflict with global environmental protection considerations. (orig.) [de

  3. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Science.gov (United States)

    2012-07-17

    ...-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a... licenses for the proposed Uniontown Hydroelectric Project and Newburgh Hydroelectric Project. The...

  4. Comparison of body conformation of Moravian warm-blooded horse and Sarvar horse

    Directory of Open Access Journals (Sweden)

    Jana Šamková

    2005-01-01

    Full Text Available Measurements of 7 body measures and 6 indices of body conformation on 34 breeding individuals of Moravian warm-blooded horse and 19 of Sarvar horse (Leutstettener were used to analyse the effect of country of origin (Czech Republik, Germany, sire lines or breed (Furioso, Przedswit, English thoroughbred, Sarvar, Others and age (4 classes. All horses were measured by one person. Measures and indexes were analysed by GLM procedure. Significant differences were found between both Czech and German population only in index of body frame. Sarvar horses are longer to their height than Moravian warm-blooded horses. The shorter body frame have the horses by English thoroughbred, the longer by Furioso. The younger horses are higher than the older. According to results of Linear Description of Body Conformation we found out, that population of Sarvar horse is more balanced than population of Moravian warm-blooded horse.

  5. A Trojan Horse in Birmingham

    Science.gov (United States)

    Yarker, Patrick

    2014-01-01

    "Trojan Horse" has become journalistic shorthand for an apparent attempt by a small group in East Birmingham to secure control of local non-faith schools and impose policies and practices in keeping with the very conservative (Salafist and Wahhabi) version of Islam which they hold. In this article, Pat Yarker gives an account of two…

  6. Invisible Trojan-horse attack

    DEFF Research Database (Denmark)

    Sajeed, Shihan; Minshull, Carter; Jain, Nitin

    2017-01-01

    We demonstrate the experimental feasibility of a Trojan-horse attack that remains nearly invisible to the single-photon detectors employed in practical quantum key distribution (QKD) systems, such as Clavis2 from ID Quantique. We perform a detailed numerical comparison of the attack performance...

  7. Morphological evolution of Bardigiano horse

    Directory of Open Access Journals (Sweden)

    A.L. Catalano

    2010-01-01

    Full Text Available The Bardigiano horse is a local breed of the province of Parma. Since the institution of the Stud Book in 1977, the breed has improved its diffusion and is currently present with 110 stallions and over 1700 mares in 43 provinces in Italy and beyond that in Germany, Switzerland and Hungary.

  8. Present status and perspectives for hydroelectric power in world

    International Nuclear Information System (INIS)

    Malquori, E.

    1991-01-01

    In the note a review of the present status and perspectives of hydroelectric power in the world is introduced. The present status regards, in chronological order, the last decade, as to say the works carried out in the 80ies whereas the perspectives regard the next twenty years as to say until 2010. The mentioned electric power potentiality refers to pure generation plants of great, middle and small size and to what could be achieved by already existing plants after changes and/or replacements and improvement of the machinery. Beside the figures regarding powers, great generation and pumping plants whose contribution has been and will be remarkable have been properly mentioned. The Italian contribution - civil works design, construction, and machinery supply - in the last hydroelectric development is briefly mentioned with particular reference to the developing countries

  9. Model documentation report: Short-Term Hydroelectric Generation Model

    International Nuclear Information System (INIS)

    1993-08-01

    The purpose of this report is to define the objectives of the Short- Term Hydroelectric Generation Model (STHGM), describe its basic approach, and to provide details on the model structure. This report is intended as a reference document for model analysts, users, and the general public. Documentation of the model is in accordance with the Energy Information Administration's (AYE) legal obligation to provide adequate documentation in support of its models (Public Law 94-385, Section 57.b.2). The STHGM performs a short-term (18 to 27- month) forecast of hydroelectric generation in the United States using an autoregressive integrated moving average (UREMIA) time series model with precipitation as an explanatory variable. The model results are used as input for the short-term Energy Outlook

  10. Aspects of the relations between the hydroelectric constructions and environment

    International Nuclear Information System (INIS)

    Michael, I.

    1993-01-01

    By their dimensions hydroelectric constructions constitute one of the evident examples of man's action upon nature, with favorable as well as unfavorable effects. By using past experience, such effects can be correctly establish and evaluated both by specialists from different fields and by representatives of the local population. The paper proposes several criteria for qualitative characterization of such effects. Some favorable and unfavorable effects of dams, lakes, secondary catchment and derivations are discussed. Also, having in view the water flow distribution which would allow a normal insertion of such construction in the environment, despite of some power production diminish diminishing, two proposals are made concerning possible solutions for secondary catchment and the hydroelectric power stations situated in the upper zones of the rivers. (author). 5 refs

  11. Indian areas threatened by hydroelectric projects in Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Aspelin, P L; Santos, S.C. dos

    1981-10-01

    In Brazil, as elsewhere, high priority is being given to developing domestic energy sources due to the spectacular increase in the cost of imported petroleum in recent years. This paper discusses the present situation of the thirty-two to thirty-four various Indian areas presently known to be threatened by seven major hydro-electric projects and one flood-control project, either planned or underway, in or directly involving Brazil. A total of at least 100,000 hectares of Indian land (or nearly one hectare for each remaining Brazilian Indian) will be flooded or otherwise expropriated by these projects. Past efforts by the Brazilian National Indian Foundation (FUNAI) to protect the Indians from the pressure of ''national development'' have not been sufficient. Research, planning, publicity, and political pressure are necessary to ensure that their efforts regarding these hydroelectric projects are more successful.

  12. The Amazon Hydroelectric Dams, an Internal Geopolitical Issue in Brazil

    International Nuclear Information System (INIS)

    Broggio, Celine; Droulers, Martine; Pallamar, Juan-Pablo

    2017-01-01

    This paper develops a geopolitical analysis of dams and hydroelectric plants in the Brazilian Amazon since the mid-2000's. The implementation of these projects has provoked tensions within the federal government under the presidency of the Workers' Party and accelerated the erosion of the ideological and political platform called 'socio-environmentalism', a situation that has led to the break-up of the coalition leading to the political crisis of 2016 and the impeachment of President Dilma Rousseff. From a regional point of view, the dispute occurred in very different terms in the case of the Madeira hydroelectric power stations (Santo Antonio and Jirau in Rondonia) and in the case of the Xingu dam (Belo Monte in Para), worldwide covered by the media

  13. Hydroelectric dams in Amazon as source of GHG

    International Nuclear Information System (INIS)

    Rosa, L.P.; Schaeffer, R.; Santos, M.A.

    1996-01-01

    A recent paper by Fearnside points out that hydroelectric development in Amazonia is a significant source of greenhouse gases (GHG) emissions. This conclusion is in contrast to the common belief that hydroelectric dams are better than fossil fuel use in electric power generation, from the view point of GHG emissions. The authors have considered both CH 4 and CO 2 emissions taking into account the instantaneous radiative forcing due to a unit increase in the concentration of gases, the decay times of gases in the atmosphere and the emissions patterns of emissions vary depending on biomass density and type of the forest area flooded, as well as on depth of flooding. As the Fearnside paper is more concerned with CO 2 emissions from the above water biomass, the authors' focus will be restricted to the formulae for calculating the cumulative effect of CO 2

  14. Atypical Parathyroid Adenoma Complicated with Protracted Hungry Bone Syndrome after Surgery: A Case Report and Literature Review

    Directory of Open Access Journals (Sweden)

    Óscar Alfredo Juárez-León

    2015-01-01

    Full Text Available Hungry Bone Syndrome refers to the severe and prolonged hypocalcemia and hypophosphatemia, following parathyroidectomy in patients with hyperparathyroidism. We present the case of an eighteen-year-old woman with a four-year history of hyporexia, polydipsia, weight loss, growth retardation, and poor academic performance. The diagnostic work-up demonstrated primary hyperparathyroidism with hypercalcemia of 13.36 mg/dL, a PTH level of 2551 pg/mL, bone brown tumors, and microcalcifications within pancreas and kidneys. Neck ultrasonography revealed a parathyroid adenoma of 33 × 14 × 14 mm, also identified on 99Tc-sestamibi scan. Bone densitometry showed decreased Z-Score values (total lumbar Z-Score of −4.2. A right hemithyroidectomy and right lower parathyroidectomy were performed. Pathological examination showed an atypical parathyroid adenoma, of 3.8 g of weight and 2.8 cm in diameter. After surgery she developed hypocalcemia with tetany and QTc interval prolongation. The patient required 3 months of oral and intravenous calcium supplementation due to Hungry Bone Syndrome (HBS. After 42 months, she is still under oral calcium. Usually HBS lasts less than 12 months. Therefore we propose the term “Protracted HBS” in patients with particularly long recovery of 1 year. We present a literature review of the diagnosis, pathophysiology, and treatment of HBS.

  15. Hydroelectric power utilization of the River Crna Reka

    International Nuclear Information System (INIS)

    Ivanova-Davidovikj, Jasna

    2001-01-01

    In the paper several feasibility studies for rational use of the Macedonian River Crna Reka, developed by foreign companies are analysed. The utilization of the hydro-power potential of the River Crna Reka is predicted to be by realization of two hydroelectric power plants with total capacity of 450 MW, as well as annual electric power generation of 600 GWh. This two HPPs will facilitate the development of the Macedonian electric power system

  16. Fish passage hydroelectric power plant Linne, Netherlands. Didson measurements

    International Nuclear Information System (INIS)

    Van Keeken, O.A.; Griffioen, A.B.

    2011-11-01

    The hydroelectric power plant in the Dutch Maas River near Linne has a fish deflection and passage system. For this study, two evenings in the months of August and September 2011 were dedicated to examining the extent to which fish approached and used the fish passage system. To establish the swimming behavior of the fish, a high-resolution sonar (DIDSON) was used, which generates moving images of fish in turbid waters, to study their behavior. [nl

  17. SOME SLAUGHTER-HOUSE RATES OF HORSES

    Directory of Open Access Journals (Sweden)

    Vlasta Mandić

    2000-06-01

    Full Text Available Nowdays horses are raised and used almost only for sport and recreation and, of course, for meat production. With the possibility of buying fresh horse meat and products based on horse meat, new eating habits have been acquired. The number of horses in the Republic of Croatia has been decreasing continually, which can result in import rather than in export of horse meat, unless a proper and a good breeding plan for horse meat production is made soon. In existing small private slaughter-houses, together with other animals, horses are slaughtered but in a very small number (just to meet the needs of the market. As those horses are of different genetic bases, (mostly cold blooded and cross-bred as well as of different age, sex and physical shape, the slaughter-house yield greatly varies. Due to some injuries, blindenss or lameness horses are killed coercively as to gain minimal profit. In distinction from other animals where the percentage of carcass yield is very high, sloughter-house yield of horse carcass is not high due to a small number of killed animals

  18. Genetic diversity of Syrian Arabian horses.

    Science.gov (United States)

    Almarzook, S; Reissmann, M; Arends, D; Brockmann, G A

    2017-08-01

    Although Arabian horses have been bred in strains for centuries and pedigrees have been recorded in studbooks, to date, little is known about the genetic diversity within and between these strains. In this study, we tested if the three main strains of Syrian Arabian horses descend from three founders as suggested by the studbook. We examined 48 horses representing Saglawi (n = 18), Kahlawi (n = 16) and Hamdani (n = 14) strains using the Equine SNP70K BeadChip. For comparison, an additional 24 Arabian horses from the USA and three Przewalski's horses as an out group were added. Observed heterozygosis (H o ) ranged between 0.30 and 0.32, expected heterozygosity (H e ) between 0.30 and 0.31 and inbreeding coefficients (F is ) between -0.02 and -0.05, indicating high genetic diversity within Syrian strains. Likewise, the genetic differentiation between the three Syrian strains was very low (F st  horses. Among Arabian horses, we found three clusters containing either horses from the USA or horses from Syria or horses from Syria and the USA together. Individuals from the same Syrian Arabian horse strain were spread across different sub-clusters. When analyzing Syrian Arabian horses alone, the best population differentiation was found with three distinct clusters. In contrast to expectations from the studbook, these clusters did not coincide with strain affiliation. Although this finding supports the hypothesis of three founders, the genetic information is not consistent with the currently used strain designation system. The information can be used to reconsider the current breeding practice. Beyond that, Syrian Arabian horses are an important reservoir for genetic diversity. © 2017 Stichting International Foundation for Animal Genetics.

  19. Cross currents : hydroelectricity and the engineering of northern Ontario

    Energy Technology Data Exchange (ETDEWEB)

    Manore, J.L. [Calgary Univ., AB (Canada)

    1999-05-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations` peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario`s north and south. refs., figs.

  20. Cross currents : hydroelectricity and the engineering of northern Ontario

    International Nuclear Information System (INIS)

    Manore, J.L.

    1999-01-01

    The history of hydroelectric development in northern Ontario was reviewed and analysed with special emphasis on the developments along the Mattagami and Abitibi Rivers. The objective was to examine the important factors that shaped modern hydroelectric development in Canada. System builders, the privately owned Nesbitt Thomson Company, the publicly owned Hydro Electric Power Corporation of Ontario and the eventual evolution of the single power system under Ontario Hydro are chronicled. Broad historical themes such as the technological impacts, regionalism, indigenous rights, plus environmental and economic issues are examined, in addition to an appreciation of the importance of electricity in the manufacturing sector of Ontario, the impact of hydroelectric development on the northern environment and on the northern First Nations, who rely on rivers for their subsistence. Until fairly recently, government policies and interpretations of law often excluded the recognition of Aboriginal uses of river systems, thereby limiting First Nations' peoples ability to practice traditional ways of life. In essence, the book is an account of how the northeastern power system in Ontario shaped the social, political and natural environments and how the development of northeastern power sources by southern power developers shaped the regional interactions between Ontario's north and south. refs., figs

  1. Atmospheric emissions : hydro-electricity versus other options

    International Nuclear Information System (INIS)

    Chamberland, A.; Belanger, C.; Gagnon, L.

    1996-01-01

    One of the great environmental advantage offered by hydro-electricity in northern or temperate climates includes reduced atmospheric emissions. While natural gas plants, from an environmental viewpoint, are thought to be the best fossil fuel option, they emit 18 times more greenhouse gases, at least 60 times more sulfur dioxide and hundreds of times more nitrogen oxides than do hydro-electric systems. The relative SO 2 and greenhouse gas emissions from energy systems in Canada were outlined, and their environmental impacts were described. At the same time, mention was made of other environmental pollutants, such as acid rain, photochemical smog, and particulates that continue to have major impacts on the environment, but were displaced as the focus of attention by greenhouse gases. A study was conducted to determine the effects of extreme biomass decomposition and greenhouse gas emissions from reservoirs. The study showed that at depths of more than 10 centimeters below water surface, organic matter does not contribute to greenhouse gas production, even at 20 degrees C. It was demonstrated that even when maximum biomass decomposition is assumed, a modern natural gas plant would emit 14 times more green house gases than a hydroelectric plant of comparable capacity. 13 refs., 4 tabs., 3 figs

  2. Training young horses to social separation: Effect of a companion horse on training efficiency

    DEFF Research Database (Denmark)

    Hartmann, E.; Christensen, Janne Winther; Keeling, LJ

    2011-01-01

    : To investigate whether the initial presence of a familiar companion horse modifies responses to separation from the group, lowers stress levels (as measured by heart rate) and increases training efficiency. Hypothesis: Habituation to separation proceeds more quickly if the horse is first trained with a companion......Reasons for performing study: The intensity with which a horse responds to separation from its group and subsequently to being alone is relevant for both horse and handler safety. Identification of training methods that may reduce responses to separation would be useful in practice. Objectives......, and heart rate is lower when the horse is subsequently trained alone, compared to control horses trained individually from the start. Methods: Young mares (n = 32), kept in groups of 4 were exposed to social separation: 2 horses of the group were trained singly (S1, n = 16) and the remaining 2 horses (n...

  3. [Stomach ulcers in the horse--clinical and gastroscopic findings in 12 horses (1989-1990)].

    Science.gov (United States)

    Dieckmann, M; Deegen, E

    1991-08-01

    Twelve horses with clinical symptoms of a gastric disorder were studied by gastroscopy. Symptoms of gastric disorders were periprandial colic, bruxism, ructus and reflux. Preliminary to gastroscopy the horses were fasted for 24 h. Access to water was not restricted. The gastroscopy could be conducted easily using a fiberscope 2.5 m in length and 11 mm in outer diameter. While ulcers were present in the squamous fundus of all horses only one horse showed ulceration of the glandular fundus. Solitary ulcers near the margo plicatus were found in horses with mild clinical symptoms. In contrast, diffuse gastroesophageal ulceration was accompanied by severe clinical symptoms. Four horses were affected by an acute gastroesophageal ulceration with gastric reflux and subsequent aspiration pneumonia. Two of those horses suffered from acute gastric ulceration 3-4 days following laparatomy. All horses were treated with cimetidine (5 mg/kg bwt/q.i.d.) until clinical symptoms ceased.

  4. Will initiatives to promote hydroelectricity consumption be effective? Evidence from univariate and panel LM unit root tests with structural breaks

    International Nuclear Information System (INIS)

    Lean, Hooi Hooi; Smyth, Russell

    2014-01-01

    This paper examines whether initiatives to promote hydroelectricity consumption are likely to be effective by applying univariate and panel Lagrange Multiplier (LM) unit root tests to hydroelectricity consumption in 55 countries over the period 1965–2011. We find that for the panel, as well as about four-fifths of individual countries, that hydroelectricity consumption is stationary. This result implies that shocks to hydroelectricity consumption in most countries will only result in temporary deviations from the long-run growth path. An important consequence of this finding is that initiatives designed to have permanent positive effects on hydroelectricity consumption, such as large-scale dam construction, are unlikely to be effective in increasing the share of hydroelectricity, relative to consumption of fossil fuels. - Highlights: • Applies unit root tests to hydroelectricity consumption. • Hydroelectricity consumption is stationary. • Shocks to hydroelectricity consumption result in temporary deviations from the long-run growth path

  5. An estimation of the capacity to produce hydrogen by wasted hydroelectric energy for the three largest Brazilian hydroelectric

    Energy Technology Data Exchange (ETDEWEB)

    Padilha, Janine C.; Trindade, Leticia G. da; Souza, Roberto F. de [Universidade Federal do Rio Grande do Sul (UFRGS), Porto Alegre, RS (Brazil). Inst. of Chemistry], Email: janine@iq.ufrgs.br; Miguel, Marcelo [Itaipu Binacional, Foz do Iguacu, PR (Brazil)

    2010-07-01

    The use of water wasted in hydroelectric plants as normalization dam excess, which constitute a hydrodynamic potential useful to generate electric energy which can be subsequently used to produce hydrogen and its subsequent consumption in fuel cells has been considered as an alternative for hydraulic energy-rich countries like Brazil. The case is examined in which all the water wasted in the hydroelectric plants, spilled by dam gates to maintain acceptable water levels, from the 3 largest Brazilian hydroelectric plants was used to produce hydrogen. During the year of 2008, the electric energy produced from this utilization would have been equivalent to 52.8 TWh, an amount that corresponds to an increase of ca. 15% of the total electric energy produced in the country. Furthermore, if this amount of hydrogen was used in the replacement of internal combustion vehicles by fuel cells, this would have prevented the production of 2.26 x 10{sup 7} ton of Co{sub 2} per year. This plan would also significantly decrease production and release of greenhouse gases. (author)

  6. Entomologic evaluation of insect hypersensitivity in horses.

    Science.gov (United States)

    Greiner, E C

    1995-04-01

    Potential methods of incriminating insects as the cause of insect hypersensitivity are presented. A listing of the biting midges known to attack horses in North America is presented also. An example of how species may be determined to be the cause of the hypersensitivity is given using data from a recent study in Florida. Light trap collections indicated the temporal and geographic distribution of potential contributing species and collections made by vacuuming horses further delineated species by proving they feed on horses and the correct locations on the horses to match lesion distribution. Culicoides hypersensitivity in horses in Florida seems to be caused by a series of species active and feeding on the horses at different times of the year.

  7. Keeping horses in groups: A review

    DEFF Research Database (Denmark)

    Hartmann, Elke; Søndergaard, Eva; Keeling, Linda J.

    2012-01-01

    Although husbandry conditions for horses have improved over the last decades, many horses are still kept singly with limited or no physical contact to other horses. This is surprising, given the fact that keeping horses in groups is recognised best to fulfil their physical and behavioural needs......, especially their need for social contact with conspecifics, as well as to have a beneficial effect on horse–human interactions during training. Group housing of farm animals is widely applied in practice. As a consequence, scientists have investigated numerous aspects of group housing to help further improve...... animal welfare and human–animal interactions under these conditions. However, compared to this literature available in farm animals, and the plentiful studies conducted of feral horse populations, there is much less done when it comes to the management of horses kept in groups in the domestic environment...

  8. Access to realization of small hydroelectric power station in Republic of Macedonia

    International Nuclear Information System (INIS)

    Jakimova Filipovska, Nevenka

    2001-01-01

    In the paper an overview of the small-scale hydroelectric power plants is presented. The categorization groups of small to micro hydroelectric power plants by different countries are given. Also, the evaluation models of the projects for realization the small hydroelectric power plants are analysed. The aim of the paper is to stress the advantages of the small hydro projects and their implementation in Macedonia

  9. Environment and hydroelectricity colloquium - Synthesis; Colloque Environnement et Hydro-electricite - Synthese

    Energy Technology Data Exchange (ETDEWEB)

    Aelbrecht, Denis; Abadie, Marc; Baril, Dominique; Delacoux, Jean-Yves; Delaunay, Alexis; Loudiere, Daniel; Penalba, Anne; Pont, Didier; Rocq, Sylvie; Roult, Didier; Sheibani, Neda; Thevenet, Regis; Weisrock, Ghislain

    2010-10-15

    This document proposes a synthesis of a colloquium dedicated to the interactions between hydroelectric installations and the environment. The four sessions respectively addressed the impacts of hydroelectric installations on ecosystems and more particularly on pisciculture populations (strategies for migration restoration, development of fish-friendly turbines), the sedimentary management of hydroelectric installations, the implementation of the Water Framework European Directive (Austrian experience, biological assessment criteria), and examples of environmental integration of existing or projected installations

  10. Environmental Assessment for Wild Horse Gathering Inside and Outside Wild Horse Herd Management Areas

    OpenAIRE

    United States Department of the Interior, Bureau of Land Management

    1999-01-01

    Enclosed you will find the Environmental Assessment (EA) which describes the impacts of gathering wild horses in the Rock Springs Field Office area. Gathering wild horses would take place in the Great Divide Basin, White Mountain, Little Colorado, and Salt Wells Creek Wild Horse Herd Management Areas (HMA) and in an area known as the North Baxter/Jack Morrow area (outside the HMAs).

  11. Copy Number Variation in the Horse Genome

    Science.gov (United States)

    Ghosh, Sharmila; Qu, Zhipeng; Das, Pranab J.; Fang, Erica; Juras, Rytis; Cothran, E. Gus; McDonell, Sue; Kenney, Daniel G.; Lear, Teri L.; Adelson, David L.; Chowdhary, Bhanu P.; Raudsepp, Terje

    2014-01-01

    We constructed a 400K WG tiling oligoarray for the horse and applied it for the discovery of copy number variations (CNVs) in 38 normal horses of 16 diverse breeds, and the Przewalski horse. Probes on the array represented 18,763 autosomal and X-linked genes, and intergenic, sub-telomeric and chrY sequences. We identified 258 CNV regions (CNVRs) across all autosomes, chrX and chrUn, but not in chrY. CNVs comprised 1.3% of the horse genome with chr12 being most enriched. American Miniature horses had the highest and American Quarter Horses the lowest number of CNVs in relation to Thoroughbred reference. The Przewalski horse was similar to native ponies and draft breeds. The majority of CNVRs involved genes, while 20% were located in intergenic regions. Similar to previous studies in horses and other mammals, molecular functions of CNV-associated genes were predominantly in sensory perception, immunity and reproduction. The findings were integrated with previous studies to generate a composite genome-wide dataset of 1476 CNVRs. Of these, 301 CNVRs were shared between studies, while 1174 were novel and require further validation. Integrated data revealed that to date, 41 out of over 400 breeds of the domestic horse have been analyzed for CNVs, of which 11 new breeds were added in this study. Finally, the composite CNV dataset was applied in a pilot study for the discovery of CNVs in 6 horses with XY disorders of sexual development. A homozygous deletion involving AKR1C gene cluster in chr29 in two affected horses was considered possibly causative because of the known role of AKR1C genes in testicular androgen synthesis and sexual development. While the findings improve and integrate the knowledge of CNVs in horses, they also show that for effective discovery of variants of biomedical importance, more breeds and individuals need to be analyzed using comparable methodological approaches. PMID:25340504

  12. Copy number variation in the horse genome.

    Directory of Open Access Journals (Sweden)

    Sharmila Ghosh

    2014-10-01

    Full Text Available We constructed a 400K WG tiling oligoarray for the horse and applied it for the discovery of copy number variations (CNVs in 38 normal horses of 16 diverse breeds, and the Przewalski horse. Probes on the array represented 18,763 autosomal and X-linked genes, and intergenic, sub-telomeric and chrY sequences. We identified 258 CNV regions (CNVRs across all autosomes, chrX and chrUn, but not in chrY. CNVs comprised 1.3% of the horse genome with chr12 being most enriched. American Miniature horses had the highest and American Quarter Horses the lowest number of CNVs in relation to Thoroughbred reference. The Przewalski horse was similar to native ponies and draft breeds. The majority of CNVRs involved genes, while 20% were located in intergenic regions. Similar to previous studies in horses and other mammals, molecular functions of CNV-associated genes were predominantly in sensory perception, immunity and reproduction. The findings were integrated with previous studies to generate a composite genome-wide dataset of 1476 CNVRs. Of these, 301 CNVRs were shared between studies, while 1174 were novel and require further validation. Integrated data revealed that to date, 41 out of over 400 breeds of the domestic horse have been analyzed for CNVs, of which 11 new breeds were added in this study. Finally, the composite CNV dataset was applied in a pilot study for the discovery of CNVs in 6 horses with XY disorders of sexual development. A homozygous deletion involving AKR1C gene cluster in chr29 in two affected horses was considered possibly causative because of the known role of AKR1C genes in testicular androgen synthesis and sexual development. While the findings improve and integrate the knowledge of CNVs in horses, they also show that for effective discovery of variants of biomedical importance, more breeds and individuals need to be analyzed using comparable methodological approaches.

  13. 77 FR 15094 - Sawatt Hydroelectric, LLC; Notice of Application for Amendment of Exemption and Soliciting...

    Science.gov (United States)

    2012-03-14

    ... Project: Mechanicsville Hydroelectric Project. f. Location: The project is located on French River, near... and contact information at the end of comments. The Commission strongly encourages electronic filings...

  14. Genetic analysis of the Venezuelan Criollo horse.

    Science.gov (United States)

    Cothran, E G; Canelon, J L; Luis, C; Conant, E; Juras, R

    2011-10-07

    Various horse populations in the Americas have an origin in Spain; they are remnants of the first livestock introduced to the continent early in the colonial period (16th and 17th centuries). We evaluated genetic variability within the Venezuelan Criollo horse and its relationship with other horse breeds. We observed high levels of genetic diversity within the Criollo breed. Significant population differentiation was observed between all South American breeds. The Venezuelan Criollo horse showed high levels of genetic diversity, and from a conservation standpoint, there is no immediate danger of losing variation unless there is a large drop in population size.

  15. Asian horses deepen the MSY phylogeny.

    Science.gov (United States)

    Felkel, S; Vogl, C; Rigler, D; Jagannathan, V; Leeb, T; Fries, R; Neuditschko, M; Rieder, S; Velie, B; Lindgren, G; Rubin, C-J; Schlötterer, C; Rattei, T; Brem, G; Wallner, B

    2018-02-01

    Humans have shaped the population history of the horse ever since domestication about 5500 years ago. Comparative analyses of the Y chromosome can illuminate the paternal origin of modern horse breeds. This may also reveal different breeding strategies that led to the formation of extant breeds. Recently, a horse Y-chromosomal phylogeny of modern horses based on 1.46 Mb of the male-specific Y (MSY) was generated. We extended this dataset with 52 samples from five European, two American and seven Asian breeds. As in the previous study, almost all modern European horses fall into a crown group, connected via a few autochthonous Northern European lineages to the outgroup, the Przewalski's Horse. In total, we now distinguish 42 MSY haplotypes determined by 158 variants within domestic horses. Asian horses show much higher diversity than previously found in European breeds. The Asian breeds also introduce a deep split to the phylogeny, preliminarily dated to 5527 ± 872 years. We conclude that the deep splitting Asian Y haplotypes are remnants of a far more diverse ancient horse population, whose haplotypes were lost in other lineages. © 2018 Stichting International Foundation for Animal Genetics.

  16. Occurrence of Wounds in Nigerian Horses.

    Science.gov (United States)

    Agina, Onyinyechukwu A; Ihedioha, John I

    2017-01-01

    This study investigated the occurrence of wounds in Nigerian horses. The study population was 1,621 horses sold at the Obollo Afor horse lairage in Enugu State, Nigeria, during a 6-month period: 3 months of dry season and 3 months of rainy season (February-April and June-August 2012). A total of 207 horses were systematically sampled and subjected to a comprehensive physical examination. Those with wounds were marked, recorded, and clinically examined. Of the 207 horses sampled, 21 (10.1%) had wounds. The body distribution of the wounds was 9.5% head, 9.5% forelimbs, 19.1% hind limbs, 4.8% tail, 14.3% flank, 9.5% loin, 19.1% hip, 9.5% barrel, and 4.8% croup. The occurrence of the wounds was not significantly associated with sex or season, but the occurrence in adults was significantly (p horses. It was concluded that the occurrence of wounds is relatively high (10.1%), and mainly the hind limbs, hip, and flank of adult horses are affected. It was recommended that horse guardians and handlers should be properly educated on the care of horses.

  17. Discospondylitis in an adult horse

    International Nuclear Information System (INIS)

    Hillyer, M.H.; Innes, J.F.; Patteson, M.W.; Barr, A.R.S.

    1996-01-01

    Discospondylitis, of presumed bacterial origin, was diagnosed in an adult thoroughbred racehorse. The clinical signs were vague and associated with abnormal mobility of the neck and forelimbs. Clinical pathology showed only a non-specific inflammatory response. A scintigraphic examination revealed the site of the lesion and the diagnosis was confirmed by the identification of radiographic changes affecting two thoracic vertebrae. A prolonged course of antimicrobial agents produced a complete recovery and the horse returned to full athletic use

  18. Copper sulphate poisoning in horses

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, M

    1975-01-01

    In the archives of the Clinic for Internal Diseases of Domestic Animals at the Veterinary Faculty of Zagreb University some thirty cases of horse disease diagnosed as copper sulphate poisoning were noted. The data correspond in many respects to the clinical findings of copper sulphate poisoning in other domestic animals. A series of experimental horse poisonings were undertaken in order to determine the toxicity of copper sulphate. The research results are as follows: Horses are sensitive to copper sulphate. Even a single application of 0.125 g/kg body weight in 1% concentration by means of incubation into the stomach causes stomach and gut disturbances and other poisoning symptoms. Poisoning occurs in two types: acute and chronic. The former appears after one to three applications of copper sulphate solution and is characterized by gastroenteritis, haemolysis, jaundice and haemoglobinuria with signs of consecutive damage of kidney, liver and other organs. The disease, from the first application to death lasts for two weeks. Chronic poisoning is caused by ingestion of dry copper sulphate in food (1% solution dried on hay or clover) for two or more months. There are chronic disturbances of stomach and gut and loss of weight, and consecutive (three to four) haemolytic crises similar to those of acute poisoning. From the beginning of poisoning to death six or more months can elapse.

  19. Vertebral body osteomyelitis in the horse

    International Nuclear Information System (INIS)

    Markel, M.D.; Madigan, J.E.; Lichtensteiger, C.A.; Large, S.M.; Hornof, W.J.

    1986-01-01

    The clinical signs, laboratory data, results of nuclear scintigraphy and radiographic examination of five horses with vertebral body osteomyelitis are described together with response to treatment. Three horses were less than five months of age. Four horses demonstrated hindlimb paresis and in three a focus of pain in the thoracolumbar region could be identified. An umbilical abscess, a caudal lobe lung abscess and a patent urachus were considered primary niduses of infection in each of three horses. Leucocytosis, neutrophilia, anaemia and elevated fibrinogen were the most consistent laboratory abnormalities. Nuclear scintigraphy was performed in three horses and identified the site of the vertebral lesion which was subsequently evaluated radiographically. In the other two horses radiographic examination in the region of areas of focal pain identified a lesion. Radiographic abnormalities included compression fractures of vertebral bodies (two), proliferative new bone (three) and soft tissue swelling ventral to a vertebral body (one). Two horses, including one with a compression fracture of the second lumbar vertebra, received parenteral antimicrobial therapy for 40 and 74 days, respectively. When re-examined six months later they showed no neurological abnormalities. The other three horses failed to respond to antimicrobial treatment and were humanely destroyed. The horse with a lung abscess also had an abscess cranial to the right tuber coxae which extended into the vertebral bodies of the third and fourth lumbar vertebrae from which Streptococcus zooepidemicus was cultured. A horse with proliferative new bone on the ventral aspect of the fifth and sixth thoracic vertebrae had a mediastinal mass associated with these vertebrae and fungal granulomas, from which Aspergillus species was cultured, in the heart and aorta, trachea, spleen and kidney. The horse with a patent urachus and soft tissue swelling ventral to the vertebral body of the 12th thoracic vertebra

  20. Development of a Safety Management Web Tool for Horse Stables.

    Science.gov (United States)

    Leppälä, Jarkko; Kolstrup, Christina Lunner; Pinzke, Stefan; Rautiainen, Risto; Saastamoinen, Markku; Särkijärvi, Susanna

    2015-11-12

    Managing a horse stable involves risks, which can have serious consequences for the stable, employees, clients, visitors and horses. Existing industrial or farm production risk management tools are not directly applicable to horse stables and they need to be adapted for use by managers of different types of stables. As a part of the InnoEquine project, an innovative web tool, InnoHorse, was developed to support horse stable managers in business, safety, pasture and manure management. A literature review, empirical horse stable case studies, expert panel workshops and stakeholder interviews were carried out to support the design. The InnoHorse web tool includes a safety section containing a horse stable safety map, stable safety checklists, and examples of good practices in stable safety, horse handling and rescue planning. This new horse stable safety management tool can also help in organizing work processes in horse stables in general.

  1. Terminal-Nerve-Derived Neuropeptide Y Modulates Physiological Responses in the Olfactory Epithelium of Hungry Axolotls (Ambystoma mexicanum)

    Science.gov (United States)

    Mousley, Angela; Polese, Gianluca; Marks, Nikki J.; Eisthen, Heather L.

    2007-01-01

    The vertebrate brain actively regulates incoming sensory information, effectively filtering input and focusing attention toward environmental stimuli that are most relevant to the animal's behavioral context or physiological state. Such centrifugal modulation has been shown to play an important role in processing in the retina and cochlea, but has received relatively little attention in olfaction. The terminal nerve, a cranial nerve that extends underneath the lamina propria surrounding the olfactory epithelium, displays anatomical and neurochemical characteristics that suggest that it modulates activity in the olfactory epithelium. Using immunocytochemical techniques, we demonstrate that neuropeptide Y (NPY) is abundantly present in the terminal nerve in the axolotl (Ambystoma mexicanum), an aquatic salamander. Because NPY plays an important role in regulating appetite and hunger in many vertebrates, we investigated the possibility that NPY modulates activity in the olfactory epithelium in relation to the animal's hunger level. We therefore characterized the full length NPY gene from axolotls to enable synthesis of authentic axolotl NPY for use in electrophysiological experiments. We find that axolotl NPY modulates olfactory epithelial responses evoked by L-glutamic acid, a food-related odorant, but only in hungry animals. Similarly, whole-cell patch-clamp recordings demonstrate that bath application of axolotl NPY enhances the magnitude of a tetrodotoxin-sensitive inward current, but only in hungry animals. These results suggest that expression or activity of NPY receptors in the olfactory epithelium may change with hunger level, and that terminal nerve-derived peptides modulate activity in the olfactory epithelium in response to an animal's changing behavioral and physiological circumstances. PMID:16855098

  2. Terminal nerve-derived neuropeptide y modulates physiological responses in the olfactory epithelium of hungry axolotls (Ambystoma mexicanum).

    Science.gov (United States)

    Mousley, Angela; Polese, Gianluca; Marks, Nikki J; Eisthen, Heather L

    2006-07-19

    The vertebrate brain actively regulates incoming sensory information, effectively filtering input and focusing attention toward environmental stimuli that are most relevant to the animal's behavioral context or physiological state. Such centrifugal modulation has been shown to play an important role in processing in the retina and cochlea, but has received relatively little attention in olfaction. The terminal nerve, a cranial nerve that extends underneath the lamina propria surrounding the olfactory epithelium, displays anatomical and neurochemical characteristics that suggest that it modulates activity in the olfactory epithelium. Using immunocytochemical techniques, we demonstrate that neuropeptide Y (NPY) is abundantly present in the terminal nerve in the axolotl (Ambystoma mexicanum), an aquatic salamander. Because NPY plays an important role in regulating appetite and hunger in many vertebrates, we investigated the possibility that NPY modulates activity in the olfactory epithelium in relation to the animal's hunger level. We therefore characterized the full-length NPY gene from axolotls to enable synthesis of authentic axolotl NPY for use in electrophysiological experiments. We find that axolotl NPY modulates olfactory epithelial responses evoked by l-glutamic acid, a food-related odorant, but only in hungry animals. Similarly, whole-cell patch-clamp recordings demonstrate that bath application of axolotl NPY enhances the magnitude of a tetrodotoxin-sensitive inward current, but only in hungry animals. These results suggest that expression or activity of NPY receptors in the olfactory epithelium may change with hunger level, and that terminal nerve-derived peptides modulate activity in the olfactory epithelium in response to an animal's changing behavioral and physiological circumstances.

  3. Measurents of natural radioactivity in an underground hydroelectric power plant

    International Nuclear Information System (INIS)

    Malvicini, Andrea; Esposito, PierLuigi; Depiesse, Danielle

    2008-01-01

    In underground working places, especially when ventilation is not properly regulated, large amounts of natural radioactivity can be found. This can give rise to potential exposures of non-negligible magnitude. Direct measurements of gamma radiation and radon were carried out during excavation works for the construction of an hydroelectric plant in the north of Italy. After the construction of the plant, in order to reduce radon concentrations and to improve ventilation effectiveness, the main entry gate was motorized and automated. Then, in order to find the optimal speed for the fans located in the galleries and in the power plant, radon and airflow velocity were measured. Correlation data between airflow and radon concentrations were found. An automatic regulation system has been set up using air velocity detectors and slightly modifying the software for the control and regulation of the power plant. Measurements must be made in order to identify radon sources and evaluate quantitative contributions as a function of ventilation. Underground hydroelectric plants are provided with entry galleries as well as secondary galleries from which radon coming out from the soil and the walls can exhale in quantities that depend on the contents of 226 Ra in the rocks and in the building materials. Other radon sources are the water coming out from the walls of the galleries and the water in the deep well located at the bottom of the power plant. Geological studies and mathematical models are useful means for the analysis of the relative contributions of the main sources as well as for the prediction of the effects deriving from modifications of the hydroelectric plant ventilation system or resulting from other important structural changes. (author)

  4. Rutgers Young Horse Teaching and Research Program: sustainability of taking a risk with "at risk" horses.

    Science.gov (United States)

    Ralston, Sarah L; Molnar, Anne

    2012-12-01

    In 1999, the Young Horse Teaching and Research Program (YHTRP) was initiated at Rutgers University. The unique aspect of the program was using horses generally considered "at risk" and in need of rescue, but of relatively low value. The risks of using horses from pregnant mare urine (PMU) ranches and Bureau of Land Management (BLM) mustangs were high, but, ultimately, unrealized. No students or staff members were seriously injured over the course of the next 12 yr, and the horses were sold annually as highly desirable potential athletes or pleasure horses, usually at a profit. The use of "at risk" horses generated a significant amount of positive media attention and attracted substantial funding in the form of donations and sponsorships, averaging over $60,000 (USD)per year. Despite economic downturns, public and industry support provided sustainability for the program with only basic University infrastructural support. Taking the risk of using "at risk" horses paid off, with positive outcomes for all.

  5. Robust Optimisation for Hydroelectric System Operation under Uncertainty

    OpenAIRE

    Apostolopoulou, D.; De Greve, Z.; McCulloch, M.

    2018-01-01

    In this paper, we propose an optimal dispatch scheme for a cascade hydroelectric power system that maximises the head levels of each dam, and minimises the spillage effects taking into account uncertainty in the net load variations, i.e., the difference between the load and the renewable resources, and inflows to the cascade. By maximising the head levels of each dam the volume of water stored, which is a metric of system resiliency, is maximised. In this regard, the operation of the cascade ...

  6. Mitigation measures for the La Grande 1 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1992-01-01

    Measures to mitigate environmental impacts of the La Grande 1 hydroelectric development are described. An overview is presented of the La Grande 1 project, its surrounding environment, and the principle environmental repercussions of the reservoir, hydrological changes between the dam and river mouth, construction activities and permanent and temporary structures, and presence of workers. Mitigation measures including compensation, corrective measures (deforestation, selective cutting, fish populations, wildlife populations, land rehabilitation, access roads, fisheries, and erosion control), protective measures, enhancement measures, and contract and employment opportunities for the Cree population are described. 10 refs., 2 figs

  7. Understanding the costs and schedule of hydroelectric projects

    International Nuclear Information System (INIS)

    Merrow, E.W.; Schroeder, B.R.

    1991-01-01

    This paper is based on a study conducted for the World Bank which evaluated the feasibility of developing an empirically based ex ante project analysis system for hydroelectric projects. The system would be used to assess: the reasonableness of engineering-based cost and schedule estimates used for project appraisal and preliminary estimates used to select projects for appraisal; and the potential for cost growth and schedule slip. The system would help identify projects early in the project appraisal process that harbor significantly higher than normal risks of overrunning cost and schedule estimates

  8. Hydroelectric rent and precipitation variability: the case of Norway

    International Nuclear Information System (INIS)

    Amundsen, E.S.; Tjoetta, Sigve

    1993-01-01

    Norway is about to reorganize its electricity production sector from a predominantly administered one to one which is based on market prices and principles of efficiency. The objective of this paper is to model the energy sector and to measure the size of hydro rent before and after the reorganization. We construct a regionally diversified and integrated equilibrium model of production, transmission and distribution of hydroelectricity. Particular attention is paid to the role of precipitation variability for the size and regional variation of hydro rent. We consider alternative routes for assessing the size of hydro rent in a long-run perspective. (author)

  9. Relevance of test information in horse breeding

    NARCIS (Netherlands)

    Ducro, B.J.

    2011-01-01

    The aims of this study were 1) to determine the role of test results of young

    horses in selection for sport performance, 2) to assess the genetic diversity

    of a closed horse breed and 3) the consequences of inbreeding for male

    reproduction. The study was

  10. Incomplete linear tibial fractures in two horses

    International Nuclear Information System (INIS)

    Johnson, P.J.; Allhands, R.V.; Baker, G.J.; Boero, M.J.; Foreman, J.H.; Hyyppa, T.; Huhn, J.C.

    1988-01-01

    Incomplete linear tibial fractures were identified in two horses with the aid of scintigraphy. Both horses were treated successfully by strict stall confinement, and both returned to normal athletic activity. Scintigraphy can be used to facilitate the generally difficult diagnosis of incomplete tibial fractures

  11. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  12. Exploring the virome of diseased horses

    Science.gov (United States)

    Li, Linlin; Giannitti, Federico; Low, Jason; Keyes, Casey; Ullmann, Leila S.; Deng, Xutao; Aleman, Monica; Pesavento, Patricia A.; Pusterla, Nicola

    2015-01-01

    Metagenomics was used to characterize viral genomes in clinical specimens of horses with various organ-specific diseases of unknown aetiology. A novel parvovirus as well as a previously described hepacivirus closely related to human hepatitis C virus and equid herpesvirus 2 were identified in the cerebrospinal fluid of horses with neurological signs. Four co-infecting picobirnaviruses, including an unusual genome with fused RNA segments, and a divergent anellovirus were found in the plasma of two febrile horses. A novel cyclovirus genome was characterized from the nasal secretion of another febrile animal. Lastly, a small circular DNA genome with a Rep gene, from a virus we called kirkovirus, was identified in the liver and spleen of a horse with fatal idiopathic hepatopathy. This study expands the number of viruses found in horses, and characterizes their genomes to assist future epidemiological studies of their transmission and potential association with various equine diseases. PMID:26044792

  13. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-08-03

    ... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a feature of the... considered timely only if it is received in the office of the Lease of Power Privilege Coordinator by or...

  14. 76 FR 51961 - Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro...

    Science.gov (United States)

    2011-08-19

    ... On August 3, 2011, Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility (Trust No. 1... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-082] Brown Bear Power, LLC, Topsham Hydroelectric Generating Facility Trust No. 1, Topsham Hydro Partners Limited Partnership...

  15. Feasibility, Design and Construction of a Small Hydroelectric Power Generation Station as a Student Design Project.

    Science.gov (United States)

    Peterson, James N.; Hess, Herbert L.

    An undergraduate capstone engineering design project now provides hydroelectric power to a remote wilderness location. Students investigated the feasibility of designing, building, and installing a 4kW hydroelectric system to satisfy the need for electric power to support the research and teaching functions of Taylor Ranch, a university facility…

  16. What are the stakes of the hydroelectric power? Supplement: report on the renewable energies

    International Nuclear Information System (INIS)

    2003-01-01

    The document presents the regulation and the stakes concerning the hydroelectricity development in France: contribution to the greenhouse effect fight, the environment preservation, possible uses. It proposes then, a grid of a socio-economical evaluation of the projects. In this framework, the impacts of the little hydroelectric power and the possible corrective measures are described. (A.L.B.)

  17. 78 FR 62361 - Green Mountain Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed...

    Science.gov (United States)

    2013-10-21

    ... Power Corporation; Vermont; Otter Creek Hydroelectric Project; Notice of Proposed Restricted Service... issuance of a new license for the Otter Creek Hydroelectric Project No. 2558. The programmatic agreement... Agreement would be incorporated into any Order issuing a license. Green Mountain Power Corporation, as...

  18. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Science.gov (United States)

    2011-05-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003 Montana] Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  19. 77 FR 47628 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting...

    Science.gov (United States)

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting Postponement On July 17, 2012, the...), on the Eagle Mountain Pumped Storage Hydroelectric Project. However, the meeting has been postponed...

  20. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental Assessment In accordance with... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S...

  1. 76 FR 22393 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation...

    Science.gov (United States)

    2011-04-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Cancellation of Teleconference On March 15... Mountain Pumped Storage Hydroelectric Project. This meeting has been cancelled. We will reschedule this...

  2. Ecological impact from large constructions of hydroelectric power plants in Parana River, Brazil

    International Nuclear Information System (INIS)

    Bonetto, Argentino A.

    1992-01-01

    An analysis over environmental impacts on Parana River as a result of the hydroelectric power plants construction is presented. Hydroelectric dams, also including the planned ones, are showing during the explanation, and biologic aspects are discussed. 30 refs., 4 figs., 2 tabs

  3. 76 FR 67178 - Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement...

    Science.gov (United States)

    2011-10-31

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Wells Hydroelectric Project; Notice of Availability of the Final Environmental Impact Statement for the Wells... application for license for the Wells Hydroelectric Project (FERC No. 2149), located on the Columbia River in...

  4. 78 FR 25263 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-04-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Hydroelectric Project. e. All local, state, and federal agencies, tribes, and interested parties, are hereby...

  5. 76 FR 71967 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12740-003-VA] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... application for an original license for the 3.0-megawatt (MW) Flannagan Hydroelectric Project located on the...

  6. 75 FR 15705 - Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2010-03-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12555-004-PA] Mahoning Creek Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment March 23, 2010. In... reviewed the application for an original license for the Mahoning Creek Hydroelectric Project, to be...

  7. 77 FR 26537 - Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2012-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Availability of Final Environmental Assessment In accordance with the... the proposed 14,000-kilowatt (kW) Jennings Randolph Hydroelectric Project located on the North Branch...

  8. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-01-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12576-004] CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment December 23, 2010. In accordance... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No...

  9. 77 FR 43280 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2012-07-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Mountain Pumped Storage Hydroelectric Project. e. All local, state, and federal agencies, tribes, and...

  10. 76 FR 70437 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment

    Science.gov (United States)

    2011-11-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Availability of Final Environmental Assessment In accordance with... original license for the 3.7-megawatt (MW) Gathright Hydroelectric Project located on the Jackson River in...

  11. 78 FR 26358 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With...

    Science.gov (United States)

    2013-05-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Meeting With the Bureau of Land Management a... Policy and Management Act and the Federal Power Act), on the Eagle Mountain Pumped Storage Hydroelectric...

  12. 75 FR 73059 - Record of Decision and Floodplain Statement of Findings for the Cushman Hydroelectric Project...

    Science.gov (United States)

    2010-11-29

    ... Floodplain Statement of Findings for the Cushman Hydroelectric Project, Mason County, Washington... Project in Mason County, Washington. These components include a new 3.6 megawatt (MW) powerhouse on the... components of the Cushman Hydroelectric Project in Mason County, Washington. These components include a new 3...

  13. Risks in the operation of hydroelectric power plants and nuclear power in Brazil

    International Nuclear Information System (INIS)

    Goldemberg, J.

    1986-01-01

    A comparison between the utilization of electrical energy generated by hydroelectric power plant and nuclear power plant is made. The risks from nuclear installations and the environmental effects of hydroelectric power plants and nuclear power plants are presented. (E.G.) [pt

  14. Production capacity of equipment for medium and large hydroelectric power plant in China

    Energy Technology Data Exchange (ETDEWEB)

    Huang Shenyang [Ministry of Electric Power, Beijing (China). Bureau of Electric Power Machinery

    1995-07-01

    This document presents an overview on the production capacity of equipment for medium and large hydroelectric power plant in China. The document approaches general aspects, production capability and testing facilities related to Francis, Kaplan, tubular and impulse hydroelectric generating sets, and the introduction of main manufacturers as well.

  15. Amplification of Marzagao small scale hydroelectric power plant; Ampliacao da PCH de Marzagao

    Energy Technology Data Exchange (ETDEWEB)

    Zeller, A.R.; Porto, D.S.; Pinto, F.S. [Leme Engenharia, MG (Brazil); Melo, A.U.; Almeida, A.M.; Pereira, D.R. [Fertiligas Industria e Comercio Ltda., MG (Brazil)

    1991-12-31

    This work presents the modernization and power augmentation of Marzagao small scale hydroelectric power plant. In order that the costs of the project be compatible to the total of investments in the project, it was necessary the adoption of methodologies and time scales different from those used for large and medium scale hydroelectric power plants 5 figs.

  16. 78 FR 69663 - Jonathan and Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption

    Science.gov (United States)

    2013-11-20

    ... Jayne Chase Troy Mills Hydroelectric Inc.; Notice of Transfer of Exemption 1. By letter filed October 15, 2013, Jonathan Chase informed the Commission that the exemption from licensing for the Troy Hydroelectric Project, FERC No. 13381, originally issued December 2, 2011,\\1\\ has been transferred to Troy Mills...

  17. 76 FR 81929 - South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project

    Science.gov (United States)

    2011-12-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 199-205] South Carolina Public Service Authority; Notice of Workshop for Santee Cooper Hydroelectric Project On May 26 and...) and the South Carolina Public Service Authority (SCPSA), licensee for the Santee-Cooper Hydroelectric...

  18. New erection program of the hydroelectric power plant Beznau. Das Neubauprojekt des hydraulischen Kraftwerkes Beznau

    Energy Technology Data Exchange (ETDEWEB)

    Bretscher, B; Hauenstein, W [NOK Nordostschweizerische Kraftwerke AG, Baden (Switzerland)

    1992-02-21

    The projected hydroelectric power plant at Beznau on the Aare river will produce about 43% more electric power than the present hydroelectric power plant. The water level and the buildings in the Aare will remain unchanged, so that the enviromental impact will be relativley slight. The project is in accordance with the building permit so that no adaptations on modifications will be required. (orig.).

  19. 75 FR 51258 - Boott Hydropower, Inc.; Eldred L Field Hydroelectric Facility Trust; Notice of Application for...

    Science.gov (United States)

    2010-08-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2790-055] Boott Hydropower... Hydropower, Inc. and Eldred L Field Hydroelectric Facility Trust. e. Name of Project: Lowell Hydroelectric... Affairs Coordinator, Boott Hydropower, Inc., One Tech Drive, Suite 220, Andover, MA 01810. Tel: (978) 681...

  20. Mercury accumulation in bats near hydroelectric reservoirs in Peninsular Malaysia.

    Science.gov (United States)

    Syaripuddin, Khairunnisa; Kumar, Anjali; Sing, Kong-Wah; Halim, Muhammad-Rasul Abdullah; Nursyereen, Muhammad-Nasir; Wilson, John-James

    2014-09-01

    In large man-made reservoirs such as those resulting from hydroelectric dam construction, bacteria transform the relatively harmless inorganic mercury naturally present in soil and the submerged plant matter into toxic methylmercury. Methylmercury then enters food webs and can accumulate in organisms at higher trophic levels. Bats feeding on insects emerging from aquatic systems can show accumulation of mercury consumed through their insect prey. In this study, we investigated whether the concentration of mercury in the fur of insectivorous bat species was significantly higher than that in the fur of frugivorous bat species, sampled near hydroelectric reservoirs in Peninsular Malaysia. Bats were sampled at Temenggor Lake and Kenyir Lake and fur samples from the most abundant genera of the two feeding guilds-insectivorous (Hipposideros and Rhinolophus) and frugivorous (Cynopterus and Megaerops) were collected for mercury analysis. We found significantly higher concentrations of total mercury in the fur of insectivorous bats. Mercury concentrations also differed significantly between insectivorous bats sampled at the two sites, with bats from Kenyir Lake, the younger reservoir, showing higher mercury concentrations, and between the insectivorous genera, with Hipposideros bats showing higher mercury concentrations. Ten bats (H. cf. larvatus) sampled at Kenyir Lake had mercury concentrations approaching or exceeding 10 mg/kg, which is the threshold at which detrimental effects occur in humans, bats and mice.

  1. The hydrogen economy urgently needs environmentally sustainable hydroelectricity

    International Nuclear Information System (INIS)

    Goodland, R.

    1995-01-01

    Only two sources of energy were said to have the capacity to bridge the transition to fully sustainable and renewable energy, namely natural gas and hydro. The argument was made that because of this advantage, both forms will have to be promoted fast, since the transition to sustainable energy is urgent. In so far as natural gas supplies are concerned, it was estimated that they will last for perhaps the next 50 years, whereas hydroelectric potential is practically unlimited. Developing nations could vastly accelerate their development, reduce poverty and approach sustainability by exporting hydro to industrial countries. Similarly, industrial nations switching from fossil fuels to hydrogen could move up the environmental ranking, and significantly help alleviating global pollution and climate risks. Environmental ranking of new energy sources, world reservoirs of hydroelectric power, environmental and social ranking of hydro sites, the environmental impacts of hydro projects, and the concept of environmental sustainability in hydro reservoirs, were summarized. Greater acceptance of the need for sustainable development by the hydro industry was urged, along with more care in selecting hydro development sites with sustainability as a prime objective. 23 refs., 6 figs

  2. Impacts of the Garafiri hydroelectric dam on the Konkoure estuary

    International Nuclear Information System (INIS)

    Samoura, K.; Waaub, J.P.

    2008-01-01

    This article described the environmental impacts caused by the exploitation of one or several dams in tropical coastal basins. In particular, it proposed a methodological approach for analyzing the vulnerability of ecosystems to modifications caused by the exploitation of the Garafiri hydroelectric dam in Guinea. With an installed power capacity of 75 MW, this dam has been operational since 1999 and has supplied electricity to coastal and mid Guinea since 2000. Since then, the ecosystem of the Konkoure River has undergone important changes. This study focused primarily on impacts during the dry season. Data was collected at different hydroelectric stations along the Konkoure Basin to estimate changes in water flow in the estuary. The study showed several changes, including noticeable impacts on the soil salt content. In addition, changes in vegetation were attributed to changes in soil content. The study revealed that rice production has increased 65 per cent since 2000, while salt exploitation has been completely discontinued. It was concluded that the hydraulic management of the dam can have a significant impact on the region's ecosystem which can in turn influence ecological and social economic functions. It was concluded that the vulnerability of the ecosystem can be worsened in the context of climate change. 25 refs., 9 figs

  3. Benefits of fish passage and protection measures at hydroelectric projects

    International Nuclear Information System (INIS)

    Cada, G.F.; Jones, D.W.

    1993-01-01

    The US Department of Energy's Hydropower Program is engaged in a multi-year study of the costs and benefits of environmental mitigation measures at nonfederal hydroelectric power plants. An initial report (Volume 1) reviewed and surveyed the status of mitigation methods for fish passage, instream flows, and water quality; this paper focuses on the fish passage/protection aspects of the study. Fish ladders were found to be the most common means of passing fish upstream; elevators/lifts were less common, but their use appears to be increasing. A variety of mitigative measures is employed to prevent fish from being drawn into turbine intakes, including spill flows, narrow-mesh intake screens, angled bar racks, and lightor sound-based guidance measures. Performance monitoring and detailed, quantifiable performance criteria were frequently lacking at non-federal hydroelectric projects. Volume 2 considers the benefits and costs of fish passage and protection measures, as illustrated by case studies for which performance monitoring has been conducted. The report estimates the effectiveness of particular measures, the consequent impacts on the fish populations that are being maintained or restored, and the resulting use and non-use values of the maintained or restored fish populations

  4. Energy harvesting from hydroelectric systems for remote sensors

    Directory of Open Access Journals (Sweden)

    Joaquim Azevedo

    2016-10-01

    Full Text Available Hydroelectric systems are well-known for large scale power generation. However, there are virtually no studies on energy harvesting with these systems to produce tens or hundreds of milliwatts. The goal of this work was to study which design parameters from large-scale systems can be applied to small-scale systems. Two types of hydro turbines were evaluated. The first one was a Pelton turbine which is suitable for high heads and low flow rates. The second one was a propeller turbine used for low heads and high flow rates. Several turbine geometries and nozzle diameters were tested for the Pelton system. For the propeller, a three-bladed turbine was tested for different heads and draft tubes. The mechanical power provided by these turbines was measured to evaluate the range of efficiencies of these systems. A small three-phase generator was developed for coupling with the turbines in order to evaluate the generated electric power. Selected turbines were used to test battery charging with hydroelectric systems and a comparison between several efficiencies of the systems was made.

  5. Culicoides species attracted to horses with and without insect hypersensitivity

    NARCIS (Netherlands)

    Rijt, van der R.; Boom, van den R.; Jongema, Y.; Sloet van Oldruitenborgh-Oosterbaan, M.M.

    2008-01-01

    The aims of this study were to determine (1) which species of Culicoides is most commonly attracted to horses, (2) whether horses suffering insect hypersensitivity attract more Culicoides spp. than unaffected horses, and (3) the times when Culicoides spp. are most active. Horses affected by insect

  6. 29 CFR 780.122 - Activities relating to race horses.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 3 2010-07-01 2010-07-01 false Activities relating to race horses. 780.122 Section 780.122... Activities relating to race horses. Employees engaged in the breeding, raising, and training of horses on..., employees engaged in the racing, training, and care of horses and other activities performed off the farm in...

  7. 9 CFR 93.307 - Articles accompanying horses.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Articles accompanying horses. 93.307... FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses § 93.307 Articles accompanying horses. No..., blankets, or other things used for or about horses governed by the regulations this part, shall be landed...

  8. 9 CFR 93.311 - Milk from quarantined horses.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Milk from quarantined horses. 93.311... FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses § 93.311 Milk from quarantined horses. Milk or cream from horses quarantined under the provisions of this part shall not be used by any person other...

  9. 9 CFR 11.4 - Inspection and detention of horses.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Inspection and detention of horses. 11... AGRICULTURE ANIMAL WELFARE HORSE PROTECTION REGULATIONS § 11.4 Inspection and detention of horses. For the purpose of effective enforcement of the Act: (a) Each horse owner, exhibitor, trainer, or other person...

  10. 9 CFR 93.312 - Manure from quarantined horses.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Manure from quarantined horses. 93.312... FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses § 93.312 Manure from quarantined horses. No manure shall be removed from the quarantine premises until the release of the horses producing same. ...

  11. 9 CFR 93.317 - Horses from Canada.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Horses from Canada. 93.317 Section 93... CONVEYANCE AND SHIPPING CONTAINERS Horses Canada 16 § 93.317 Horses from Canada. (a) Except as provided in paragraph (c) of this section, horses from Canada shall be inspected as provided in § 93.306; shall be...

  12. Effect of early training on the jumping technique of horses

    NARCIS (Netherlands)

    Santamaría, Susana; Bobbert, Maarten F.; Back, Willem; Barneveld, Ab; van Weeren, P. Rene

    Objective - To investigate the effects of early training for jumping by comparing the jumping technique of horses that had received early training with that of horses raised conventionally. Animals - 40 Dutch Warmblood horses. Procedure - The horses were analyzed kinematically during free jumping at

  13. 9 CFR 93.325 - Horses from Mexico.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Horses from Mexico. 93.325 Section 93... CONVEYANCE AND SHIPPING CONTAINERS Horses Mexico 18 § 93.325 Horses from Mexico. Horses offered for entry from Mexico shall be inspected as provided in §§ 93.306 and 93.323; shall be accompanied by a...

  14. Environmental consequences of hydroelectric development: the role of facility size and type

    International Nuclear Information System (INIS)

    Gleick, P.H.

    1992-01-01

    The development of hydroelectric power throughout the world is receiving renewed attention as the economic, political, and environmental costs of conventional energy production rise. There is currently a perception that hydroelectricity has environmental and economic advantages over electricity produced by conventional energy technologies, but there is a paucity of information about the environmental impacts of hydroelectric facilities as a function of size and type. We characterize the environmental impacts of hydroelectric developments and quantify these impacts as a function of the size and type of project. Several unexpected conclusions arise from our analysis. For most hydroelectric facilities, size, as measured by installed capacity, is not necessarily a good indicator or the severity of environmental costs. For impacts such as land flooded and evaporative water lost, smaller facilities cause greater environmental disruptions per unit of energy produced than do larger facilities. (Author)

  15. Injuries in group kept horses

    DEFF Research Database (Denmark)

    Mejdell, C.M.; Jorgensen, G.M.; Keeling, L.

    2014-01-01

    developed and validated a scoring system for external injuries in horses to be able to record the severity of a lesion in a standardized and simple way under field conditions. The scoring system has five categories from insignificant loss of hair to severe, life threatening injuries. It was used...... of different breeds, age and gender. Most injuries occurred the day after mixing. Injuries of the more severe categories 4 and 5, which normally would necessitate veterinary care and/or loss of function for some time, were not observed at all. The minor injuries categorized as 1-2 counted for 99% of the total...

  16. Endocrine Disease in Aged Horses.

    Science.gov (United States)

    Durham, Andy E

    2016-08-01

    Aging horses may be at particular risk of endocrine disease. Two major equine endocrinopathies, pituitary pars intermedia dysfunction and equine metabolic syndrome, are commonly encountered in an aging population and may present with several recognizable signs, including laminitis. Investigation, treatment, and management of these diseases are discussed. Additionally, aging may be associated with development of rarer endocrinopathic problems, often associated with neoplasia, including diabetes mellitus and other confounders of glucose homeostasis, as well as thyroid, parathyroid, and adrenal diseases. Brief details of the recognition and management of these conditions are presented. Copyright © 2016 Elsevier Inc. All rights reserved.

  17. Trojan Horse Method: Recent Results

    International Nuclear Information System (INIS)

    Pizzone, R. G.; Spitaleri, C.

    2008-01-01

    Owing the presence of the Coulomb barrier at astrophysically relevant kinetic energies, it is very difficult, or sometimes impossible to measure astrophysical reaction rates in laboratory. This is why different indirect techniques are being used along with direct measurements. The THM is unique indirect technique allowing one measure astrophysical rearrangement reactions down to astrophysical relevant energies. The basic principle and a review of the main application of the Trojan Horse Method are presented. The applications aiming at the extraction of the bare S b (E) astrophysical factor and electron screening potentials U e for several two body processes are discussed

  18. Diagnosis of hoof diseases in horses using computed tomography

    International Nuclear Information System (INIS)

    Kovac, M.; Nowak, M.; Kaufels, N.; Tambur, Z.

    2002-01-01

    This study describes findings of computed tomography investigations at the Bergische Equine Clinic (Bergische Tierklinik), Germany, of 39 horses with hoof diseases. The most frequently findings were the navicular syndrome (eight horses), laminitis (seven horses), keratnoma (six horses) and ossification of collateral cartilages in the distal phalanx (four horses). The special value of the computed tomography is in evaluating the size and courses fracture/fissure of the navicular and koffin bones, which were diagnose in five horses. In four of horses no pathologic changes of the hoof were determined by computed tomography

  19. Distal phalanx fractures in horses: a survey of 274 horses with radiographic assessment of healing in 36 horses

    International Nuclear Information System (INIS)

    Honnas, C.M.; O'Brien, T.R.; Linford, R.L.

    1988-01-01

    The case records of 274 horses with fractures of the distal phalanx were reviewed. Fifty-two horses had bilateral forelimb fractures, for a total of 326 distal phalanx fractures. The fractures were classified into one of five previously described types, based on the radiographic anatomic configuration of the fracture. Solar margin fractures, which have been briefly described in other reports and previously classified as type V fractures, were identified in 132 horses. This type of fracture is distinct from other distal phalanx fractures. Due to the high incidence of solar margin fractures, these fractures were classified as a separate type (type VI). Follow-up radiographic examinations to assess fracture healing were available for 36 horses. Twenty-two horses with distal phalanx fractures (three type I, nine type II, two type III, one type IV, one type V, and six type VI) had radiographic evidence of complete bony union of the fracture at a mean of 11 months after injury. Eight horses with conplete type II fractures involving the articular surface had bony union of the body and solar margin, but not the subchondral bone at the articular surface, a mean of 11 months after injury. Six horses (four type II and two type IV) had little radiographic evidence of bony healing during the follow-up period. All fractures that eventually healed had evidence of progression toward bony union by 6 months after injury

  20. 18 CFR 292.209 - Exceptions from requirements for hydroelectric small power production facilities located at a new...

    Science.gov (United States)

    2010-04-01

    ... requirements for hydroelectric small power production facilities located at a new dam or diversion. 292.209... Exceptions from requirements for hydroelectric small power production facilities located at a new dam or... the Federal Power Act, at which non-Federal hydroelectric development is permissible; or (2) An...

  1. 76 FR 22128 - Notice of Intent To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Science.gov (United States)

    2011-04-20

    ... for Hydroelectric Power Development at the Granby Dam Outlet, a Feature of the Colorado-Big Thompson... Reclamation, will consider proposals for non-Federal development of hydroelectric power at Granby Dam Outlet of the C-BT, Colorado. Reclamation is considering such hydroelectric power development under a lease...

  2. 76 FR 14653 - BOST3 Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC (BOST3); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12756-003. c. Date filed: July 26, 2010. d. Applicant: BOST3 Hydroelectric Company, LLC (BOST3...

  3. 76 FR 14651 - BOST4 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-03-17

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  4. 77 FR 34030 - BOST1 Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Science.gov (United States)

    2012-06-08

    ... Hydroelectric LLC; Notice of Intent To File License Application, Filing of Pre-Application Document, and.... Date Filed: March 21, 2012. d. Submitted By: BOST1 Hydroelectric LLC (BOST1). e. Name of Project: Coon Rapids Dam Hydroelectric Project. f. Location: Mississippi River in Hennepin and Anoka counties...

  5. 77 FR 785 - BOST5 Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST5); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  6. 76 FR 21885 - BOST5 Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2011-04-19

    ... Hydroelectric Company, LLC; Notice of Application Tendered for Filing With the Commission and Soliciting Additional Study Requests Take notice that the following hydroelectric application has been filed with the... No.: P-12758-003. c. Date filed: March 28, 2011. d. Applicant: BOST5 Hydroelectric Company, LLC...

  7. 77 FR 786 - BOST4 Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and...

    Science.gov (United States)

    2012-01-06

    ... Hydroelectric Company, LLC, (BOST4); Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests Take notice that the following hydroelectric application has been filed with the... No.: P-12757-003. c. Date filed: February 24, 2011. d. Applicant: BOST4 Hydroelectric Company, LLC...

  8. 18 CFR 292.208 - Special requirements for hydroelectric small power production facilities located at a new dam or...

    Science.gov (United States)

    2010-04-01

    ... for hydroelectric small power production facilities located at a new dam or diversion. 292.208 Section... requirements for hydroelectric small power production facilities located at a new dam or diversion. (a) A hydroelectric small power production facility that impounds or diverts the water of a natural watercourse by...

  9. Open Fracture of the Forearm Bones due to Horse Bite

    OpenAIRE

    Santoshi, John Ashutosh; Leshem, Lall

    2014-01-01

    Introduction: Fractures have been described mainly following falling accidents in horse-related injuries. Horse bites are uncommon accidents. We present a case of open fracture of the forearm due to horse bite. Case Report: A 35-year-old male farm-worker presented to the emergency room with alleged history of horse bite to the right forearm about 2 hours prior to presentation while feeding the horse. There was deformity of the forearm with multiple puncture wounds, deep abrasions and small...

  10. Stress and its effects on horses reproduction

    Directory of Open Access Journals (Sweden)

    Amal M. AboEl-Maaty

    2011-11-01

    Full Text Available A total of 90 mares and horses were subjected to blood sampling for determining the effect of management (farm, reproductive condition, sex, age, breed and month of the year during breeding on circulating levels of cortisol and sex hormones. Blood samples were collected from December to the following June from four farms. Blood sera underwent testosterone, estradiol, progesterone and cortisol assaying using ELISA kits. Cortisol levels were significantly low in lactating mares during their foal heat but significantly high levels were recorded in both repeat breeder mares and horses used for racing. High and significant testosterone and estradiol levels were recorded in both stallions used for breeding especially after semen collection and early pregnant mares. Similar testosterone levels were recorded in both early pregnant mares and racing horses but high levels were recorded in stallions. Estradiol was high in both early pregnant and mares with endometritis but the highest levels were observed in stallions. Horses held in private farms had high cortisol levels compared to those of governmental farms. In contrast to mares, horses had low cortisol and high estradiol levels. Cortisol levels were high from April to June (Spring and early summer compared to its levels from December to March (Winter. Arab horses had low cortisol compared to native and imported foreign breeds. In conclusion, environmental condition, exercise, breed, management and the purpose of raising horses all are affecting its cortisol levels.

  11. Generalization of a tactile stimulus in horses.

    Science.gov (United States)

    Dougherty, D M; Lewis, P

    1993-05-01

    Using horses, we investigated the control of operant behavior by a tactile stimulus (the training stimulus) and the generalization of behavior to six other similar test stimuli. In a stall, the experimenters mounted a response panel in the doorway. Located on this panel were a response lever and a grain dispenser. The experimenters secured a tactile-stimulus belt to the horse's back. The stimulus belt was constructed by mounting seven solenoids along a piece of burlap in a manner that allowed each to provide the delivery of a tactile stimulus, a repetitive light tapping, at different locations (spaced 10.0 cm apart) along the horse's back. Two preliminary steps were necessary before generalization testing: training a measurable response (lip pressing) and training on several reinforcement schedules in the presence of a training stimulus (tapping by one of the solenoids). We then gave each horse two generalization test sessions. Results indicated that the horses' behavior was effectively controlled by the training stimulus. Horses made the greatest number of responses to the training stimulus, and the tendency to respond to the other test stimuli diminished as the stimuli became farther away from the training stimulus. These findings are discussed in the context of behavioral principles and their relevance to the training of horses.

  12. BREEDING AND UTILIZATION OF ARABIAN HORSE TODAY

    OpenAIRE

    Vlasta Mandić; Josip Ljubešić; Tomo Rastija; Živko Bošnjak

    2000-01-01

    Arab horse raising has a hundred year old tradition. A real stud farm raising started by purchasing original reproductive material from Asia in 1895, 1897 and 1899. Apart from state stud in Goražde, Arab horse was also raised in several private stud farms, especially in Slavonia and Srijem region. By the end of the II World war Arab horse raising was restricted to only 2-3 stud farms, regardless the above mentioned oldest Arab stud farm Goražde. According to reports refering to en...

  13. BREEDING AND UTILIZATION OF ARABIAN HORSE TODAY

    Directory of Open Access Journals (Sweden)

    Vlasta Mandić

    2000-06-01

    Full Text Available Arab horse raising has a hundred year old tradition. A real stud farm raising started by purchasing original reproductive material from Asia in 1895, 1897 and 1899. Apart from state stud in Goražde, Arab horse was also raised in several private stud farms, especially in Slavonia and Srijem region. By the end of the II World war Arab horse raising was restricted to only 2-3 stud farms, regardless the above mentioned oldest Arab stud farm Goražde. According to reports refering to end of 1940 in former Yugoslavia there were slightly more than 150 grown up thoroughbred Arab heads, stallions and mares in both private and public property. A number of well known stud farms was reduced, thus, Arab horse raising was limited only to stud farms Goražde, Inocens Dvor and Karađorđevo. Sires were mostly used in Bosnian-mountain horse breeding whereas in plain areas they were used for ceossing with heavy draft mares or raising of, in that time numerous represented, nonius breed. The year 1970 was characterized by Arab horses reduction, thereby raising stagnation. Horse raising was closed, so, 77 Sabich stallion, bought in Germany, started again Arab horse raising, firstly in Goražde. It was also attributed by raising establishment of agricultural economy Višnjica near Slatina. At the same time Arab horse raising increased slowly at individual raisers in Kutina, Vrbovsko, Istria, Čađavica and Zagreb vicinity. According to available data from 1999 there were approx. 132 stallions and mares due to horse raisers scattered throught Croatia. All male and female reproductive heads were mostly used as raising heads for thoroughbred raising or for crossing with other breeds which is justified by the data from the period 1930-1935. On the other hand one part of reproductive heads, especially males, were used as sports heads for gallop races and distance riding as Arab horses were used by their arrival to present areas and by Arab horse raising tradition.

  14. Food words distract the hungry: Evidence of involuntary semantic processing of task-irrelevant but biologically-relevant unexpected auditory words.

    Science.gov (United States)

    Parmentier, Fabrice B R; Pacheco-Unguetti, Antonia P; Valero, Sara

    2018-01-01

    Rare changes in a stream of otherwise repeated task-irrelevant sounds break through selective attention and disrupt performance in an unrelated visual task by triggering shifts of attention to and from the deviant sound (deviance distraction). Evidence indicates that the involuntary orientation of attention to unexpected sounds is followed by their semantic processing. However, past demonstrations relied on tasks in which the meaning of the deviant sounds overlapped with features of the primary task. Here we examine whether such processing is observed when no such overlap is present but sounds carry some relevance to the participants' biological need to eat when hungry. We report the results of an experiment in which hungry and satiated participants partook in a cross-modal oddball task in which they categorized visual digits (odd/even) while ignoring task-irrelevant sounds. On most trials the irrelevant sound was a sinewave tone (standard sound). On the remaining trials, deviant sounds consisted of spoken words related to food (food deviants) or control words (control deviants). Questionnaire data confirmed state (but not trait) differences between the two groups with respect to food craving, as well as a greater desire to eat the food corresponding to the food-related words in the hungry relative to the satiated participants. The results of the oddball task revealed that food deviants produced greater distraction (longer response times) than control deviants in hungry participants while the reverse effect was observed in satiated participants. This effect was observed in the first block of trials but disappeared thereafter, reflecting semantic saturation. Our results suggest that (1) the semantic content of deviant sounds is involuntarily processed even when sharing no feature with the primary task; and that (2) distraction by deviant sounds can be modulated by the participants' biological needs.

  15. Genetic Correlations between Young Horse and Dressage Competition Results in Danish Warmblood Horses

    DEFF Research Database (Denmark)

    Jönsson, Lina Johanna Maria; Christiansen, Karina; Holm, Maiken

    2014-01-01

    .13˗0.48) than the breeding goal trait of dressage competition results (0.16). Young horse results showed medium high to high genetic correlations to dressage competition results (0.32˗0.91) where most recorded young horse gait- and conformation scores contributed with considerable information to future dressage...... competition results. If considering both accuracy of each young horse trait and genetic correlation to dressage competition results, as rg×rIA, the best young horse indicator traits for future performance were capacity, trot, canter, and rideability, all under own rider. Most important conformation traits...

  16. Small hydroelectric power development in India: a profile

    International Nuclear Information System (INIS)

    Bhattacharya, Partha

    1993-01-01

    Small hydroelectric power plants (SHPs) have a definite role to play in the contemporary energy scenario generally as a source for supplementing the electrical energy production and particularly in remote rural areas in meeting the energy requirements of isolated communities. SHPs practically do not produce any adverse impact.However, their success depends on the ingenuity of the planners and the designers, and more importantly the convection. Another dimension to the success is the participation and involvement of the beneficiaries of the project which are more relevant for the microhydro electric schemes in the remote areas. The major factor that influences the commercial success of the SHP is marketing. It should be given due emphasis. This necessitates the SHP development activities to be more pragmatic and relevant to the society needs; an approach which is programme-based, rather than a project-oriented, is needed. (author). 4 refs

  17. Optimal control of hydroelectric facility incorporating pump storage

    International Nuclear Information System (INIS)

    Zhao, Guangzhi; Davison, Matt

    2009-01-01

    We consider a simple model of a pump-assisted hydroelectric facility operating in a market with time-varying but deterministic power prices and constant water inflows. The engineering details of the facility are described by a model containing several parameters. We present an algorithm for optimizing first the energy and then the profit produced by these plants. This algorithm allows us to describe the relationships between control trajectory and time, and between inflow and price. Remarkably, we see that under some reasonable choices of facility parameters and for power prices that are not extremely variable, the optimal profit operation of these facilities is not too different from their optimal energy operation, and the control is less affected by the price as the inflow rate increases. (author)

  18. Hydrogen-based industry from remote excess hydroelectricity

    International Nuclear Information System (INIS)

    Ouellette, N.; Rogner, H.-H.; Scott, D.S.

    1997-01-01

    This paper examines synergies, opportunities and barriers associated with hydrogen and excess hydro-electricity in remote areas. The work is based on a case study that examined the techno-economic feasibility of a new hydrogen-based industry using surplus/off-peak generating capacity of the Taltson Dam and Generating Station in the Northwest Territories, Canada. After evaluating the amount and cost of hydrogen that could be produced from the excess capacity, the study investigates three hydrogen utilization scenarios: (1) merchant liquid or compressed hydrogen, (2) hydrogen as a chemical feedstock for the production of hydrogen peroxide, (3) methanol production from biomass, oxygen and hydrogen. Hydrogen peroxide production is the most promising and attractive strategy in the Fort Smith context. The study also illustrates patterns that recur in isolated sites throughout the world. (Author)

  19. The renewal of hydroelectric concessions in competitive call

    International Nuclear Information System (INIS)

    2013-01-01

    This document discusses various issues associated with the planned competitive call on the French hydraulic power plants. The principles of this competitive call for hydroelectric concessions are first addressed: administrative regime of concessions, competitive call process, criteria of selection of the concession holder, case of 'concession of valleys', potential competitors. It outlines and discusses the difficulties of this competitive call: France is the single country to implement this procedure; it concerns a national asset; it questions the guarantee of a future use of equipment at best for the energy benefits of French consumers; the competitive call is a nice idea indeed but extremely complex. A note discusses the profitability aspects of Plants for Transfer of Energy by Pumping

  20. Ecological review of hydroelectric reservoirs in Puerto Rico

    Energy Technology Data Exchange (ETDEWEB)

    Jobin, W.R.; Ferguson, F.F.; Brown, R.

    1976-10-01

    A review of published literature and available data on the ecology of hydroelectric reservoirs and other lakes in Puerto Rico yielded various studies on unrelated elements in the aquatic ecology, but very few comprehensive investigations. The majority of the island-wide studies pertained to surveys on snails related to the parasitic disease bilharzia. A survey of 28 major lakes in 1976 showed that Biomphalaria glabrata had gradually been displaced from most of the lakes by Marisa cornuarietis and Tarebia granifera, two foreign snails which do not transmit bilharzia. Of the 17 lakes containing B. glabrata in 1956, only 8 remained infested in 1966 and only 5 in 1976, twenty years after the introduction of Marisa cornuarietis. Although the trend indicates that the lakes may be safe from transmission a monitoring system is necessary before the lakes could be used for recreation.

  1. Benefits and applications of modular hydroelectric pumped storage

    International Nuclear Information System (INIS)

    Koebbe, R.S.

    1991-01-01

    This paper reports on hydroelectric pumped storage which is the only proven and most efficient technology available for energy storage. It is used by utilities to provide peak and intermediate power and to optimize overall system performance. Because of increased environmental and regulatory constraints, few acceptable sites, long schedules, and huge financial commitments, large conventional pumped storage plants, are now virtually impossible to build. As an alternative, small modular pumped storage, with project sizes ranging from 25 MW to 200 MW, was created to overcome the difficulties of conventional projects. The modular approach involves standardizing the elements of a pumped storage plant by utilizing specialized siting techniques and optimizing design, equipment, and construction. Compared with conventional pumped storage, the modular design can reduce cost and expedite schedule; reduce environmental concerns and permitting obstacles; and expand applications of energy storage on a utility's system

  2. Study of the Time Response of a Simulated Hydroelectric System

    International Nuclear Information System (INIS)

    Simani, S; Alvisi, S; Venturini, M

    2014-01-01

    This paper addresses the design of an advanced control strategy for a typical hydroelectric dynamic process, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solution, the proposed methodology relies on an adaptive control designed by means of the on-line identification of the system model under monitoring. Extensive simulations and comparison with respect to a classic hydraulic turbine speed PID regulator show the effectiveness of the proposed modelling and control tools

  3. Short-cut design of small hydroelectric plants

    Energy Technology Data Exchange (ETDEWEB)

    Voros, N.G.; Kiranoudis, C.T.; Maroulis, Z.B. [National Technical Univ. of Athens, Dept. of Chemical Engineering, Athens (Greece)

    2000-04-01

    The problem of designing small hydroelectric plants has been properly analysed and addressed in terms of maximising the economic benefits of the investment. An appropriate empirical model describing hydroturbine efficiency was developed. An overall plant model was introduced by taking into account their construction characteristics and operational performance. The hydrogeographical characteristics for a wide range of sites have been appropriately analysed and a model that involves significant physical parameters has been developed. The design problem was formulated as a mathematical programming problem, and solved using appropriate programming techniques. The optimisation covered a wide range of site characteristics and three types of commercially available hydroturbines. The methodology introduced an empirical short-cut design equation for the determination of the optimum nominal flowrate of the hydroturbines and the estimation of the expected unit cost of electricity produced, as well as of the potential amount of annually recovered energy. (Author)

  4. Ultra-low-head hydroelectric technology: A review

    Energy Technology Data Exchange (ETDEWEB)

    Zhou, Daqing; Deng, Zhiqun (Daniel)

    2017-10-01

    In recent years, distributed renewable energy-generation technologies, such as wind and solar, have developed rapidly. Nevertheless, the utilization of ultra-low-head (ULH) water energy (i.e., situations where the hydraulic head is less than 3 m or the water flow is more than 0.5 m/s with zero head) has received little attention. We believe that, through technological innovations and cost reductions, ULH hydropower has the potential to become an attractive, renewable, and sustainable resource. This paper investigates potential sites for ULH energy resources, the selection of relevant turbines and generators, simplification of civil works, and project costs. This review introduces the current achievements on ULH hydroelectric technology to stimulate discussions and participation of stakeholders to develop related technologies for further expanding its utilization as an important form of renewable energy.

  5. Hydroelectric developments in Nunavik : update on impact benefit agreements

    Energy Technology Data Exchange (ETDEWEB)

    Aatami, P. [Makivik Corp., Makivik, NF (Canada)

    2004-07-01

    The Partnership Agreement on Economic and Community Development in Nunavik is intended to accelerate development of natural resources in Nunavik and promote autonomy of the Inuit regional organizations. This can be accomplished through hydroelectric projects, mining, sport hunting, outfitting and tourism. In recent years, activities in these domains have raised fundamental questions pertaining to the advantages and disadvantages of resource development. The role that the Impact Benefit Agreement has on business opportunities has been examined more closely. The results of the Impact Benefit Agreement and its implication for the Cree Nation and hydro development in untapped regions of northern Quebec were described along with the role of the parties in financing future projects. An overview of the costs, benefits and considerations for hydro opportunities in northern Quebec was presented with reference to the electricity grid and the incentives for large investment. 1 fig.

  6. Study of the Time Response of a Simulated Hydroelectric System

    Science.gov (United States)

    Simani, S.; Alvisi, S.; Venturini, M.

    2014-12-01

    This paper addresses the design of an advanced control strategy for a typical hydroelectric dynamic process, performed in the Matlab and Simulink environments. The hydraulic system consists of a high water head and a long penstock with upstream and downstream surge tanks, and is equipped with a Francis turbine. The nonlinear characteristics of hydraulic turbine and the inelastic water hammer effects were considered to calculate and simulate the hydraulic transients. With reference to the control solution, the proposed methodology relies on an adaptive control designed by means of the on-line identification of the system model under monitoring. Extensive simulations and comparison with respect to a classic hydraulic turbine speed PID regulator show the effectiveness of the proposed modelling and control tools.

  7. Hydroelectric plant turbine, stream and spillway flow measurement

    Energy Technology Data Exchange (ETDEWEB)

    Lampa, J.; Lemon, D.; Buermans, J. [ASL AQ Flow Inc., Sidney, BC (Canada)

    2004-07-01

    This presentation provided schematics of the turbine flow measurements and typical bulb installations at the Kootenay Canal and Wells hydroelectric power facilities in British Columbia. A typical arrangement for measuring stream flow using acoustic scintillation was also illustrated. Acoustic scintillation is portable, non-intrusive, suitable for short intakes, requires minimal maintenance and is cost effective and accurate. A comparison between current meters and acoustic scintillation was also presented. Stream flow measurement is valuable in evaluating downstream areas that are environmentally important for fish habitat. Stream flow measurement makes it possible to define circulation. The effects of any changes can be assessed by combining field measurements and numerical modelling. The presentation also demonstrated that computational fluid dynamics modelling appears promising in determining stream flow and turbulent flow at spillways. tabs., figs.

  8. Feasibility study for Boardman River hydroelectric power. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1979-02-22

    The feasibility of generating additional hydroelectric power from five consecutive existing dams located on the Boardman River in Grand Traverse County and Traverse City, Michigan, was investigated. The potential hydropower production capabilities, in terms of base load power and peak load power, the legal-institutional-environmental constraints, and the economic feasibility, including capital investment, operating costs and maintenance costs, were evaluated for each of the five dam sites individually and as a series of co-dependent facilities. The impact of installing fish passages at each site was analyzed separately. The feasibility assessment utilized the present worth analytical method, considering revenue based on thirty mills/kWh for power, 0.4% general economy escalation rate, and a 6% net income to the municipal utility. The sensitivity of fuel costs increasing at a different rate than the general price-escalation was tested by allowing the increase in fuel costs to vary from 3 to 8% per year. Assuming fuel costs increase at the same rate as the general economy, it is feasible to update, retrofit, renovate, and install hydroelectric generating capacity at Sabin, Boardman and Brown Bridge. Rehabilitation of Union Street and Keystone is also feasible but somewhat less attractive. Operating the dams as a co-dependent system has environmental advantages and can provide additional revenue through peak load power rates. A development plan to implement the above is outlined utilizing an ownership arrangement whereby Grand Traverse County provides easements for Sabin and Boardman Dams. The plan calls for operation of the system by Traverse City.

  9. The hydroelectric power market in the United States

    International Nuclear Information System (INIS)

    2002-01-01

    The second-largest producer of hydroelectric power in the world is the United States, right after Canada. In the United States, 7.1 per cent of net electricity generation was attributed to hydroelectric power in 2000, which totalled 269 terawatt hours (TWh). Aging facilities, outdated technology in some facilities, a cumbersome licensing process, and increasing environmental demands from interest groups for the preservation of river systems and surrounding wildlife challenge the industry. Pacific Coast states, especially California, were faced with electric power shortages during the summer of 2001, due to low market prices, high power usage among consumers and drought. The problems with the deregulation of the electricity market were brought to light by these shortages. Legislation to restructure the electric power industry in 25 states had not been enacted as of January 2002. The purchase of more power from both Canada and the Mexico is being considered by the government of the United States, as is the creation of a national power grid to allow for power transmission throughout the country. The Canada-United States energy trade might be affected by such a move, and result in project construction opportunities for Canadian companies. Renewable energy sources must be responsible for the generation of 10 per cent of power generation levels by 2020, on a gradual basis as mandated by law. By 2005, New York City must purchase 10 per cent of its power from renewable energy sources, reaching 20 per cent by 2010. The repair and replacement of aging dam equipment, the development of advanced turbine technology to protect fish stocks and water quality, dam removal, the construction of power lines are all opportunities open to Canadian companies. 60 refs., 5 tabs

  10. 18 CFR 16.19 - Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of...

    Science.gov (United States)

    2010-04-01

    ... existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power....19 Procedures for an existing licensee of a minor hydroelectric power project or of a minor part of a hydroelectric power project with a license not subject to sections 14 and 15 of the Federal Power Act. (a...

  11. Ancient genomes revisit the ancestry of domestic and Przewalski's horses.

    Science.gov (United States)

    Gaunitz, Charleen; Fages, Antoine; Hanghøj, Kristian; Albrechtsen, Anders; Khan, Naveed; Schubert, Mikkel; Seguin-Orlando, Andaine; Owens, Ivy J; Felkel, Sabine; Bignon-Lau, Olivier; de Barros Damgaard, Peter; Mittnik, Alissa; Mohaseb, Azadeh F; Davoudi, Hossein; Alquraishi, Saleh; Alfarhan, Ahmed H; Al-Rasheid, Khaled A S; Crubézy, Eric; Benecke, Norbert; Olsen, Sandra; Brown, Dorcas; Anthony, David; Massy, Ken; Pitulko, Vladimir; Kasparov, Aleksei; Brem, Gottfried; Hofreiter, Michael; Mukhtarova, Gulmira; Baimukhanov, Nurbol; Lõugas, Lembi; Onar, Vedat; Stockhammer, Philipp W; Krause, Johannes; Boldgiv, Bazartseren; Undrakhbold, Sainbileg; Erdenebaatar, Diimaajav; Lepetz, Sébastien; Mashkour, Marjan; Ludwig, Arne; Wallner, Barbara; Merz, Victor; Merz, Ilja; Zaibert, Viktor; Willerslev, Eske; Librado, Pablo; Outram, Alan K; Orlando, Ludovic

    2018-04-06

    The Eneolithic Botai culture of the Central Asian steppes provides the earliest archaeological evidence for horse husbandry, ~5500 years ago, but the exact nature of early horse domestication remains controversial. We generated 42 ancient-horse genomes, including 20 from Botai. Compared to 46 published ancient- and modern-horse genomes, our data indicate that Przewalski's horses are the feral descendants of horses herded at Botai and not truly wild horses. All domestic horses dated from ~4000 years ago to present only show ~2.7% of Botai-related ancestry. This indicates that a massive genomic turnover underpins the expansion of the horse stock that gave rise to modern domesticates, which coincides with large-scale human population expansions during the Early Bronze Age. Copyright © 2018 The Authors, some rights reserved; exclusive licensee American Association for the Advancement of Science. No claim to original U.S. Government Works.

  12. Distortion effects in Trojan Horse applications

    Energy Technology Data Exchange (ETDEWEB)

    Pizzone, R. G.; La Cognata, M.; Lamia, L.; Mukhamedzhanov, A. M.; Blokhintsev, L. D.; Irgaziev, B.; Bertulani, C. A.; Spitaleri, C. [Laboratori Nazionali del Sud - INFN , Catania (Italy); Universita di Catania and Laboratori Nazionali del Sud - INFN, Catania (Italy); Texas A and M University, College Station (United States); Moscow State University, Moscow (Russian Federation); Taskent University, Taskent (Uzbekistan); Texas A and M University, Commerce (United States); Universita di Catania and Laboratori Nazionali del Sud - INFN, Catania (Italy)

    2012-11-20

    Deuteron induced quasi-free scattering and reactions have been extensively investigated in the past few decades. This was done not only for nuclear structure and processes study but also for the important astrophysical implication (Trojan Horse Method, THM). In particular the width of the neutron momentum distribution in deuteron will be studied as a function of the transferred momentum. The same will be done for other nuclides of possible use as Trojan Horse particles. Trojan horse method applications will also be discussed because the momentum distribution of the spectator particle inside the Trojan horse nucleus is a necessary input for this method. The impact of the width (FWHM) variation on the extraction of the astrophysical S(E)-factor is discussed.

  13. Invisible Trojan-horse attack.

    Science.gov (United States)

    Sajeed, Shihan; Minshull, Carter; Jain, Nitin; Makarov, Vadim

    2017-08-21

    We demonstrate the experimental feasibility of a Trojan-horse attack that remains nearly invisible to the single-photon detectors employed in practical quantum key distribution (QKD) systems, such as Clavis2 from ID Quantique. We perform a detailed numerical comparison of the attack performance against Scarani-Ac´ın-Ribordy-Gisin (SARG04) QKD protocol at 1924 nm versus that at 1536 nm. The attack strategy was proposed earlier but found to be unsuccessful at the latter wavelength, as reported in N. Jain et al., New J. Phys. 16, 123030 (2014). However at 1924 nm, we show experimentally that the noise response of the detectors to bright pulses is greatly reduced, and show by modeling that the same attack will succeed. The invisible nature of the attack poses a threat to the security of practical QKD if proper countermeasures are not adopted.

  14. Risk factors and clinical course of hungry bone syndrome after total parathyroidectomy in dialysis patients with secondary hyperparathyroidism.

    Science.gov (United States)

    Ho, Lo-Yi; Wong, Ping-Nam; Sin, Ho-Kwan; Wong, Yuk-Yi; Lo, Kwok-Chi; Chan, Shuk-Fan; Lo, Man-Wai; Lo, Kin-Yee; Mak, Siu-Ka; Wong, Andrew Kui-Man

    2017-01-10

    Hungry bone syndrome (HBS) is an important postoperative complication after parathyroidectomy for severe secondary hyperparathyroidism (SHPT). There is, however, little data in the literature on its detailed clinical course, and the associated risk factors remain controversial. We did a single-center retrospective study on 62 consecutive dialysis patients who underwent total parathyroidectomy for SHPT to examine the risk factors, clinical course and outcome. Data on demographic characteristics, perioperative laboratory parameters including serum calcium, phosphate, alkaline phosphatase (ALP) and parathyroid hormone (PTH), drug treatment for SHPT and operative details of parathyroidectomy were collected. Seventeen (27.4%) patients developed severe postoperative hypocalcemia with HBS. The serum calcium dropped progressively while serum ALP rose after operation until 2 weeks later when serum calcium reached the trough and serum ALP peaked. Serum phosphate also fell but stabilized between 4 and 14 days. The total postoperative calcium and vitamin D supplementation was significantly larger, and hospital stay was significantly longer in the group with HBS as compared with those without HBS. Young age, high body weight, high preoperative ALP level, and low preoperative calcium level independently predicted the development of HBS while preoperative PTH and use of cinacalcet or paricalcitol did not. HBS was common after total parathyroidectomy in patients with SHPT, and it is important to closely monitor the postoperative serum calcium, phosphate and ALP levels in the following 2 weeks, especially for those at risk. The implications of our findings on perioperative management are discussed.

  15. Whole mitochondrial genome sequencing of domestic horses reveals incorporation of extensive wild horse diversity during domestication

    Directory of Open Access Journals (Sweden)

    Lippold Sebastian

    2011-11-01

    Full Text Available Abstract Background DNA target enrichment by micro-array capture combined with high throughput sequencing technologies provides the possibility to obtain large amounts of sequence data (e.g. whole mitochondrial DNA genomes from multiple individuals at relatively low costs. Previously, whole mitochondrial genome data for domestic horses (Equus caballus were limited to only a few specimens and only short parts of the mtDNA genome (especially the hypervariable region were investigated for larger sample sets. Results In this study we investigated whole mitochondrial genomes of 59 domestic horses from 44 breeds and a single Przewalski horse (Equus przewalski using a recently described multiplex micro-array capture approach. We found 473 variable positions within the domestic horses, 292 of which are parsimony-informative, providing a well resolved phylogenetic tree. Our divergence time estimate suggests that the mitochondrial genomes of modern horse breeds shared a common ancestor around 93,000 years ago and no later than 38,000 years ago. A Bayesian skyline plot (BSP reveals a significant population expansion beginning 6,000-8,000 years ago with an ongoing exponential growth until the present, similar to other domestic animal species. Our data further suggest that a large sample of wild horse diversity was incorporated into the domestic population; specifically, at least 46 of the mtDNA lineages observed in domestic horses (73% already existed before the beginning of domestication about 5,000 years ago. Conclusions Our study provides a window into the maternal origins of extant domestic horses and confirms that modern domestic breeds present a wide sample of the mtDNA diversity found in ancestral, now extinct, wild horse populations. The data obtained allow us to detect a population expansion event coinciding with the beginning of domestication and to estimate both the minimum number of female horses incorporated into the domestic gene pool and the

  16. Refractive state of the Spanish Thoroughbred horse: a comparison with the Crossbred horse.

    Science.gov (United States)

    Rull-Cotrina, Jorge; Molleda, Jose M; Gallardo, José; Martín-Suárez, Eva

    2013-01-01

    To assess the refractive state of the equine eye utilizing retinoscopy. To compare the refractive state of Spanish Thoroughbred horses with the refractive state of Crossbred horses. The refractive state of 135 horses (264 eyes) was assessed utilizing streak retinoscopy. Two perpendicular meridians were examined in order to assess astigmatism at a working distance of approximately 67 cm. A group of 81 Spanish Thoroughbred horses was compared with a group of 54 Crossbred horses. Cyclopentolate ophthalmic solution was instilled in the eyes of a group of 18 horses to determine if accommodation has any influence on the assessment of the refractive state.   Mean ± SE refractive state of all horses examined was -0.17 ± 0.04 D. The mean refractive state of the Spanish Thoroughbred was -0.28 ± 0.06 D while that of the Crossbred was -0.01 ± 0.05 D. The refractive state of the Spanish Thoroughbred was found to be statistically different to that of the Crossbred. The most prevalent refractive state was emmetropia in all cases, followed by hyperopia for the Crossbred, and myopia for the Spanish Thoroughbred. Astigmatism ≥0.50 D present in both eyes from the same individual was found in 21.7% of all horses examined. Anisometropia ≥1.00 D was diagnosed in 4 out of 129 horses with both visual eyes. Cycloplegia did not statistically affect the refractive state of the evaluated eyes. The equine eye has a refractive state close to emmetropia. Myopia is higher among Spanish Thoroughbred horses than among Crossbred horses. © 2012 American College of Veterinary Ophthalmologists.

  17. Miscellaneous neurologic or neuromuscular disorders in horses.

    Science.gov (United States)

    Aleman, Monica

    2011-12-01

    NMD is an important cause of morbidity in horses. Signs of dysfunction could be variable depending on the specific area affected. NM disease can go unrecognized if a thorough evaluation is not performed in diseased horses. Electrodiagnostic testing is an area that has the potential to document and improve our understanding of NM disease yet is uncommonly performed. Keeping an open and observant mind will enhance our ability to search and find answers.

  18. Generalization of a tactile stimulus in horses.

    OpenAIRE

    Dougherty, D M; Lewis, P

    1993-01-01

    Using horses, we investigated the control of operant behavior by a tactile stimulus (the training stimulus) and the generalization of behavior to six other similar test stimuli. In a stall, the experimenters mounted a response panel in the doorway. Located on this panel were a response lever and a grain dispenser. The experimenters secured a tactile-stimulus belt to the horse's back. The stimulus belt was constructed by mounting seven solenoids along a piece of burlap in a manner that allowed...

  19. Horses--Haulers, Racers, and Healers

    Science.gov (United States)

    McIntosh, Phyllis

    2014-01-01

    Providing healing support for everyone from an autistic child to a wounded veteran is just the latest addition to the horse's 5,000-year-old résumé. No animal has played a greater role in human history. Horses have carried us into war, pulled our loads, plowed our fields, and transported us over all kinds of terrain. Freed of such drudgery by…

  20. Vascular Dysfunction in Horses with Endocrinopathic Laminitis.

    Directory of Open Access Journals (Sweden)

    Ruth A Morgan

    Full Text Available Endocrinopathic laminitis (EL is a vascular condition of the equine hoof resulting in severe lameness with both welfare and economic implications. EL occurs in association with equine metabolic syndrome and equine Cushing's disease. Vascular dysfunction, most commonly due to endothelial dysfunction, is associated with cardiovascular risk in people with metabolic syndrome and Cushing's syndrome. We tested the hypothesis that horses with EL have vascular, specifically endothelial, dysfunction. Healthy horses (n = 6 and horses with EL (n = 6 destined for euthanasia were recruited. We studied vessels from the hooves (laminar artery, laminar vein and the facial skin (facial skin arteries by small vessel wire myography. The response to vasoconstrictors phenylephrine (10-9-10-5M and 5-hydroxytryptamine (5HT; 10-9-10-5M and the vasodilator acetylcholine (10-9-10-5M was determined. In comparison with healthy controls, acetylcholine-induced relaxation was dramatically reduced in all intact vessels from horses with EL (% relaxation of healthy laminar arteries 323.5 ± 94.1% v EL 90.8 ± 4.4%, P = 0.01, laminar veins 129.4 ± 14.8% v EL 71.2 ± 4.1%, P = 0.005 and facial skin arteries 182.0 ± 40.7% v EL 91.4 ± 4.5%, P = 0.01. In addition, contractile responses to phenylephrine and 5HT were increased in intact laminar veins from horses with EL compared with healthy horses; these differences were endothelium-independent. Sensitivity to phenylephrine was reduced in intact laminar arteries (P = 0.006 and veins (P = 0.009 from horses with EL. Horses with EL exhibit significant vascular dysfunction in laminar vessels and in facial skin arteries. The systemic nature of the abnormalities suggest this dysfunction is associated with the underlying endocrinopathy and not local changes to the hoof.

  1. Spine fractures caused by horse riding

    OpenAIRE

    Siebenga, Jan; Segers, Michiel J. M.; Elzinga, Matthijs J.; Bakker, Fred C.; Haarman, Henk J. T. M.; Patka, Peter

    2006-01-01

    Study Design: Retrospective study and review of literature. Objectives: Study of demographic data concerning spinal fractures caused by horse riding, classification of fractures according to the AO and Load Sharing classifications, evaluation of mid-term radiological results and long-term functional results. Methods: A review of medical reports and radiological examinations of patients presented to our hospital with horse riding-related spine fractures over a 13-year period; long-term functio...

  2. Do horses generalise between objects during habituation?

    DEFF Research Database (Denmark)

    Christensen, Janne Winther; Zharkikh, Tatjana; Ladevig, Jan

    2008-01-01

    Habituation to frightening stimuli plays an important role in horse training. To investigate the extent to which horses generalise between different visual objects, 2-year-old stallions were habituated to feeding from a container placed inside a test arena and assigned as TEST (n = 12) or REFERENCE...... horses (n = 12). In Experiment 1, TEST horses were habituated to six objects (ball, barrel, board, box, cone, cylinder) presented in sequence in a balanced order. The objects were of similar size but different colour. Each object was placed 0.5 m in front of the feed container, forcing the horses to pass...... the object to get to the food. TEST horses received as many 2 min exposures to each object as required to meet a habituation criterion. We recorded behavioural reactions to the object, latency to feed, total eating time, and heart rate (HR) during all exposures. There was no significant decrease in initial...

  3. Identification of copy number variants in horses

    KAUST Repository

    Doan, R.

    2012-03-01

    Copy number variants (CNVs) represent a substantial source of genetic variation in mammals. However, the occurrence of CNVs in horses and their subsequent impact on phenotypic variation is unknown. We performed a study to identify CNVs in 16 horses representing 15 distinct breeds (Equus caballus) and an individual gray donkey (Equus asinus) using a whole-exome tiling array and the array comparative genomic hybridization methodology. We identified 2368 CNVs ranging in size from 197 bp to 3.5 Mb. Merging identical CNVs from each animal yielded 775 CNV regions (CNVRs), involving 1707 protein- and RNA-coding genes. The number of CNVs per animal ranged from 55 to 347, with median and mean sizes of CNVs of 5.3 kb and 99.4 kb, respectively. Approximately 6% of the genes investigated were affected by a CNV. Biological process enrichment analysis indicated CNVs primarily affected genes involved in sensory perception, signal transduction, and metabolism. CNVs also were identified in genes regulating blood group antigens, coat color, fecundity, lactation, keratin formation, neuronal homeostasis, and height in other species. Collectively, these data are the first report of copy number variation in horses and suggest that CNVs are common in the horse genome and may modulate biological processes underlying different traits observed among horses and horse breeds.

  4. The Effect of Increasing Numbers of Horses of Undefined Breed on Horse Breeding in the Czech Republic

    Directory of Open Access Journals (Sweden)

    Iveta Bihuncová

    2015-01-01

    Full Text Available The objective of the present study was to analyse the numbers and division of horses of undefined breed. At the present time this group is the most numerous in the entire population of horses. Horses of undefined breed do not come under any breeder union which would provide reports about these horses; these horses are only registered and breeders are informed only about their numbers. Our study is the first to deal with the problem of increasing numbers of horses of undefined breed. The database contained 22 211 horses not entered registered in any of the stud books. In the database we filed approved horses born between 1972 and 1 September 2012 and horses registered from 1987. The data were processed in the Excel programme and results were evaluated in graphs. The most frequent horse in this group was the warm-blood type (n = 9 303, pony type (n = 6 285, cold-blooded type (n = 2 663 and unlisted horses (n = 2 278. Since 2001 the number of registered horses of undefined breed has increased. The most numerous dams of horses of undefined breed is the Czech warm-blood with 1 912 offspring; dams of the English Thoroughbred with 552 offspring and mares of the utility Huzule horse with 492 offspring. In the group of registered horses of undefined breed the Czech warm-blood appears in the pedigree of 507 colts and the American Paint Horse in the pedigree of sires of 506 colts. Why the numbers of horses of undefined breed are increasing is the boom of leisure horsemanship and unqualified horse breeding.

  5. 77 FR 33607 - Horse Protection Act; Requiring Horse Industry Organizations To Assess and Enforce Minimum...

    Science.gov (United States)

    2012-06-07

    ... substantively identical form letters submitted by individuals who commented through an animal welfare advocacy... associations, horse and animal welfare advocacy groups, participants in the horse industry, and the general... Show Report'' at http://www.aphis.usda.gov/animal_welfare/hp/hp_pubs_reports.shtml . The list of shows...

  6. Comparison between the robo-horse and real horse movements for hippotherapy.

    Science.gov (United States)

    Park, Ji H; Shurtleff, Timothy; Engsberg, Jack; Rafferty, Sandy; You, Joshua Y; You, Isaac Y; You, Sung H

    2014-01-01

    While the novel robotic hippotherapy system has gradually gained clinical application for therapeutic intervention on postural and locomotor control in individuals with neurological or musculoskeletal impairments, the system's validity and reliability for the robotic hippotherapy system has not been well established. The objective of the current study was to investigate the validity and test-retest reliability of the robotic hippotherapy system by comparing with real horse movements. The 3-axis accelerometer sensors attached on the robotic and real horse saddles were used to collect 3-dimensional acceleration data at a preferred walking velocity. Linear regression analysis showed an excellent correlation in the time-to-peak acceleration (TPA) (R(2)=0.997), but little correlation in X-axis acceleration between the real and robotic horses (R(2)=0.177), thus confirming consistent time control and a certain degree of variability between the robotic and real horse movements. The mean resultant accelerations for a real horse and robotic horse were 3.22 m/s(2) and 0.67 m/s(2), respectively, accounting for almost five times greater acceleration in the real horse than the robotic horse.

  7. 76 FR 30864 - Horse Protection Act; Requiring Horse Industry Organizations To Assess and Enforce Minimum...

    Science.gov (United States)

    2011-05-27

    ... prohibiting the showing or selling of sored horses. The regulations in 9 CFR part 11, referred to below as the... substance or device has been used by a person on any limb of a horse or a person has engaged in a practice... the regulations in Sec. 11.2 prohibit the use of devices, methods, and substances that are used to...

  8. Show Horse Welfare: Horse Show Competitors' Understanding, Awareness, and Perceptions of Equine Welfare.

    Science.gov (United States)

    Voigt, Melissa A; Hiney, Kristina; Richardson, Jennifer C; Waite, Karen; Borron, Abigail; Brady, Colleen M

    2016-01-01

    The purpose of this study was to gain a better understanding of stock-type horse show competitors' understanding of welfare and level of concern for stock-type show horses' welfare. Data were collected through an online questionnaire that included questions relating to (a) interest and general understanding of horse welfare, (b) welfare concerns of the horse show industry and specifically the stock-type horse show industry, (c) decision-making influences, and (d) level of empathic characteristics. The majority of respondents indicated they agree or strongly agree that physical metrics should be a factor when assessing horse welfare, while fewer agreed that behavioral and mental metrics should be a factor. Respondent empathy levels were moderate to high and were positively correlated with the belief that mental and behavioral metrics should be a factor in assessing horse welfare. Respondents indicated the inhumane practices that most often occur at stock-type shows include excessive jerking on reins, excessive spurring, and induced excessive unnatural movement. Additionally, respondents indicated association rules, hired trainers, and hired riding instructors are the most influential regarding the decisions they make related to their horses' care and treatment.

  9. Final Technical Report - Modernization of the Boulder Canyon Hydroelectric Project

    Energy Technology Data Exchange (ETDEWEB)

    Taddeucci, Joe [Dept. of Public Works, Boulder, CO (United States). Utilities Division

    2013-03-29

    The Boulder Canyon Hydroelectric Project (BCH) was purchased by the City of Boulder, CO (the city) in 2001. Project facilities were originally constructed in 1910 and upgraded in the 1930s and 1940s. By 2009, the two 10 MW turbine/generators had reached or were nearing the end of their useful lives. One generator had grounded out and was beyond repair, reducing plant capacity to 10 MW. The remaining 10 MW unit was expected to fail at any time. When the BCH power plant was originally constructed, a sizeable water supply was available for the sole purpose of hydroelectric power generation. Between 1950 and 2001, that water supply had gradually been converted to municipal water supply by the city. By 2001, the water available for hydroelectric power generation at BCH could not support even one 10 MW unit. Boulder lacked the financial resources to modernize the facilities, and Boulder anticipated that when the single, operational historical unit failed, the project would cease operation. In 2009, the City of Boulder applied for and received a U.S. Department of Energy (DOE) grant for $1.18 million toward a total estimated project cost of $5.155 million to modernize BCH. The federal funding allowed Boulder to move forward with plant modifications that would ensure BCH would continue operation. Federal funding was made available through the American Recovery and Reinvestment Act (ARRA) of 2009. Boulder determined that a single 5 MW turbine/generator would be the most appropriate capacity, given the reduced water supply to the plant. Average annual BCH generation with the old 10 MW unit had been about 8,500 MW-hr, whereas annual generation with a new, efficient turbine could average 11,000 to 12,000 MW-hr. The incremental change in annual generation represents a 30% increase in generation over pre-project conditions. The old turbine/generator was a single nozzle Pelton turbine with a 5-to-1 flow turndown and a maximum turbine/generator efficiency of 82%. The new unit is a

  10. Cost analysis of small hydroelectric power plants components and preliminary estimation of global cost

    International Nuclear Information System (INIS)

    Basta, C.; Olive, W.J.; Antunes, J.S.

    1990-01-01

    An analysis of cost for each components of Small Hydroelectric Power Plant, taking into account the real costs of these projects is shown. It also presents a global equation which allows a preliminary estimation of cost for each construction. (author)

  11. Impacts of nuclear and hydroelectric great projects: economical, technological, environmental and social aspects

    International Nuclear Information System (INIS)

    Rosa, L.P.; Sigaud, L.; Mielnik, O.

    1988-01-01

    Some studies about the Great Impacts of Energy Sources, mainly nuclear power plant and hydroelectric power plant, in Brazil are presented. The technological, economical, social and environmental aspects are described [pt

  12. [Impacts of hydroelectric cascade exploitation on river ecosystem and landscape: a review].

    Science.gov (United States)

    Yang, Kun; Deng, Xi; Li, Xue-Ling; Wen, Ping

    2011-05-01

    Hydroelectric cascade exploitation, one of the major ways for exploiting water resources and developing hydropower, not only satisfies the needs of various national economic sectors, but also promotes the socio-economic sustainable development of river basin. unavoidable anthropogenic impacts on the entire basin ecosystem. Based on the process of hydroelectric cascade exploitation and the ecological characteristics of river basins, this paper reviewed the major impacts of hydroelectric cascade exploitation on dam-area ecosystems, river reservoirs micro-climate, riparian ecosystems, river aquatic ecosystems, wetlands, and river landscapes. Some prospects for future research were offered, e.g., strengthening the research of chain reactions and cumulative effects of ecological factors affected by hydroelectric cascade exploitation, intensifying the study of positive and negative ecological effects under the dam networks and their joint operations, and improving the research of successional development and stability of basin ecosystems at different temporal and spatial scales.

  13. 76 FR 76709 - Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2011-12-08

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12642-003 North Carolina] Wilkesboro Hydroelectric Company, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's...

  14. Small scale hydroelectric power potential in Nevada: a preliminary reconnaissance survey

    Energy Technology Data Exchange (ETDEWEB)

    Cochran, G.F.; Fordham, J.W.; Richard, K.; Loux, R.

    1981-04-01

    This preliminary reconnaissance survey is intended to: develop a first estimate as to the potential number, location and characteristics of small-scale (50 kW to 15 MW) hydroelectric sites in Nevada; provide a compilation of various Federal and state laws and regulations, including tax and financing regulations, that affect small-scale hydroelectric development and provide information on sources of small-scale hydroelectric generation hardware and consultants/ contractors who do small scale hydroelectric work. The entire survey has been conducted in the office working with various available data bases. The site survey and site evaluation methods used are described, and data are tabulated on the flow, power potential, predicted capital expenditures required, etc. for 61 potential sites with measured flows and for 77 sites with derived flows. A map showing potential site locations is included. (LCL)

  15. Refurbishment and upgrading of Iron Gates I Hydroelectric and Navigation System on the Danube River

    International Nuclear Information System (INIS)

    Scvortov, F.; Vasiliu, A.; Rosca, N.

    1996-01-01

    This work shows the problems of the refurbishing the hydroelectric units of the Iron Gates 1 Hydroelectric and Navigation System, operating since 1970. Their long and intensive utilization leads to the necessity of their refurbishment. One is demonstrated by detailed studies that it is sensible and efficient to perform both rehabilitation of the existent hydroelectric units and their power increasing from 175 MW to 190 MW, and prior to all these, as a first step, to install an additional hydroelectric unit (G7) for each system with a capacity of 190 MW. Complex technical and energetic-economical problems appear in realizing this objective due to the necessity of analysing a great volume of data in view of taking a correct decision. (author). 7 figs

  16. Caxingo - a promising model for integrating the hydroelectric work camps to the site communities

    International Nuclear Information System (INIS)

    Luna, A.M.; Falcao, A.A.

    1989-01-01

    The social and economical impacts caused by the hydroelectric work camps in the sites where the hydroelectric will be constructed are studied, analysing the great supply of works when the hydroelectric is been constructed face to the reduction one when the works are concluded; the neglect by the State in providing medical and educational assistances to the neighbour populations; the appearance of a commerce in the neighbour areas; the employer stableness in the camp after the pension and the lack by the neighbour cities of a social and economical substructure to offer to the population, that come with the hydroelectric construction. A new solution for these problems is presented in the Xingo camp, where the camp will be as a district of city near to the work, with community services provide by the State and the needful substructure to its construction and the equipment provide by the concessionaire. (C.G.C.). 1 fig

  17. Legal obstacles and incentives to the development of small scale hydroelectric power in Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    None,

    1980-05-01

    The legal and institutional obstacles to the development of small-scale hydroelectric energy at the state level are examined. The introductory section examines the dual regulatory system from the standpoint of the appropriate legal doctrine, the law of pre-emption, application of the law to the case of hydroelectric development, and concludes with an inquiry into the practical use of the doctrine by the FERC. Additional sections cover acquisition; liability; Department for Natural Resources and Environmental Protection; energy utilities; local regulations; incidental impacts; financial considerations; and sources of information. In Kentucky, many of the impacts have not been implemented with regard to small-scale hydroelectric energy, since in Kentucky most electricity is coal-generated and any hydroelectric power that does exist, is derived from TVA or the Army Corp of Engineer projects.

  18. Severe polysaccharide storage myopathy in Belgian and Percheron draught horses.

    Science.gov (United States)

    Valentine, B A; Credille, K M; Lavoie, J P; Fatone, S; Guard, C; Cummings, J F; Cooper, B J

    1997-05-01

    A severe myopathy leading to death or euthanasia was identified in 4 Belgian and 4 Percheron draught horses age 2-21 years. Clinical signs ranged from overt weakness and muscle atrophy in 2 horses age 2 and 3 years, to recumbency with inability to rise in 6 horses age 4-21 years. In 5 horses there was mild to severe increases in muscle enzyme levels. Clinical diagnoses included equine motor neuron disease (2 horses), post anaesthetic myopathy (2 horses), exertional myopathy (2 horses), myopathy due to unknown (one horse), and equine protozoal myelitis (one horse). Characteristic histopathology of muscle from affected horses was the presence of excessive complex polysaccharide and/or glycogen, revealed by periodic acid-Schiff staining in all cases and by electron microscopy in one case. Evaluation of frozen section histochemistry performed on 2 cases indicated that affected fibres were Type 2 glycolytic fibres. Subsarcolemmal and intracytoplasmic vacuoles were most prominent in 3 horses age 2-4 years, and excessive glycogen, with little or no complex polysaccharide, was the primary compound stored in affected muscle in these young horses. Myopathic changes, including fibre size variation, fibre hypertrophy, internal nuclei, and interstitial fat infiltration, were most prominent in 5 horses age 6-21 years, and the accumulation of complex polysaccharide appeared to increase with age. Mild to moderate segmental myofibre necrosis was present in all cases.

  19. Costa Rica: Hydroelectric utility Energía Global finances upstream reforestation

    OpenAIRE

    Energía Global (Global Energy S.A.); The National Forest Office; National Fund for Forest Financing (FONAFIFO)

    2006-01-01

    Metadata only record The goal of Energía Global is to increase both the stream flow and decrease sedimentation in the hydroelectric reservoirs. They are attempting to do this by reforestation projects as well as forest conservation. The sources of revenue for this project are from the private hydroelectric company and the government through taxes on fossil fuels. PES-1 (Payments for Environmental Services Associate Award)

  20. Production costs: U.S. hydroelectric power plants, 4th Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    The book provides 1991 operation and maintenance expenses for over 800 conventional and pumped-storage hydroelectric power plants. Report shows operator and plant name, plant year-in-service, installed capacity, 1991 net generation, O ampersand M expenses, total production costs and current plant capitalization. Fifty eight percent of the utility-owned hydroelectric plants in the US are covered by this report. Data diskette provides additional capital and production cost accounts and number of employees for each plant

  1. The Feasibility of Small Hydro-Electric Generation in a Large Urban Area

    OpenAIRE

    Benson Y. Zhang; Adam Taylor

    2012-01-01

    The possibilities of generating electric power from relatively small hydro-electric sources in a large urban area is investigated. Two different aspects of hydro-electric sources have been studied: storm/waste water pipes in large multi-tenanted residential buildings and urban storm water discharge area (CSI area). The potential to generate from these sources has been investigated using a micro-turbine. The potential electric power which could be extracted from the sources was estimated using...

  2. Environmental mitigation at hydroelectric projects. Volume 2, Benefits and costs of fish passage and protection

    Energy Technology Data Exchange (ETDEWEB)

    Francfort, J.E.; Rinehart, B.N.; Sommers, G.L. [EG and G Idaho, Inc., Idaho Falls, ID (United States); Cada, G.F.; Jones, D.W. [Oak Ridge National Lab., TN (United States); Dauble, D.D. [Pacific Northwest Lab., Richland, WA (United States); Hunt, R.T. [Hunt (Richard) Associates, Inc., Concord, NH (United States); Costello, R.J. [Northwest Water Resources Advisory Services (United States)

    1994-01-01

    This study examines envirorunental mitigation practices that provide upstream and downstream fish passage and protection at hydroelectric projects. The study includes a survey of fish passage and protection mitigation practices at 1,825 hydroelectric plants regulated by the Federal Energy Regulatory Commission (FERC) to determine frequencies of occurrence, temporal trends, and regional practices based on FERC regions. The study also describes, in general terms, the fish passage/protection mitigation costs at 50 non-Federal hydroelectric projects. Sixteen case studies are used to examine in detail the benefits and costs of fish passage and protection. The 16 case studies include 15 FERC licensed or exempted hydroelectric projects and one Federally-owned and-operated hydroelectric project. The 16 hydroelectric projects are located in 12 states and range in capacity from 400 kilowatts to 840 megawatts. The fish passage and protection mitigation methods at the case studies include fish ladders and lifts, an Eicher screen, spill flows, airburst-cleaned inclined and cylindrical wedgewire screens, vertical barrier screens, and submerged traveling screens. The costs, benefits, monitoring methods, and operating characteristics of these and other mitigation methods used at the 16 case studies are examined.

  3. Renal replacement therapy in healthy adult horses.

    Science.gov (United States)

    Wong, D M; Witty, D; Alcott, C J; Sponseller, B A; Wang, C; Hepworth, K

    2013-01-01

    Renal replacement therapy (RRT) has been implemented extensively in people to facilitate recovery from acute renal failure (ARF). RRT has not been explored in horses, but might provide a further treatment option in horses with ARF. To investigate efficacy and safety of RRT in horses. Five healthy adult horses. A prospective study was performed on horses restrained in stocks and intravenously connected to a commercial RRT machine to allow continuous venovenous hemodiafiltration to be performed for 6 hours. The RRT machine was set at the following flow rates: blood flow rate 250 mL/min; dialysate rate 3,000 mL/h; prefilter replacement pump 3,000 mL/h; and postfilter replacement pump rate 2,000 mL/h. Balanced electrolyte solution was used as dialysate and replacement fluid. Heart rate, respiratory rate, body temperature, direct arterial blood pressure, urine output, and various clinicopathologic parameters were measured over the study period. Renal replacement therapy was successfully performed in horses, resulting in a mean creatinine clearance of 0.127 mL/kg/min (68.9 mL/min) and urea reduction ratio of 24%. No adverse effects were detected although a significant decrease in rectal temperature was observed (P ≤ .007). A significant increase in serum phosphorus (P ≤ .001) and decrease in BUN (P replacement therapy can safely and effectively be used in adult horses. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  4. Motivation for social contact in horses measured by operant conditioning

    DEFF Research Database (Denmark)

    Søndergaard, Eva; Jensen, Margit Bak; Nicol, Christine J.

    2011-01-01

    and muzzle contact, respectively, to a familiar companion horse. Horses were housed individually next to their companion horse and separations between pens prevented physical contact. During daily test sessions horses were brought to a test area where they could access an arena allowing social contact. Arena......Although horses are social animals they are often housed individually with limited social contact to other horses and this may compromise their welfare. The present study included eight young female horses and investigated the strength of motivation for access to full social contact, head contact...... test session was recorded. All horses could access all three types of social contact in a cross-over design, and an empty arena was used as control. Motivational strength was assessed using elasticity of demand functions, which were estimated based on the number of rewards earned and FR. Elasticities...

  5. Behaviour and stress responses in horses with gastric ulceration

    DEFF Research Database (Denmark)

    Malmkvist, Jens; Poulsen, Janne Møller; Luthersson, Nanna

    2012-01-01

    Only little is known about behaviour and stress responses in horses with gastric ulceration, despite the high prevalence of this condition. Our objectives in the present study was to (i) describe the severity of gastric ulceration in horses, housed under relatively standardised conditions, and (ii......) to investigate whether horses with severe glandular gastric ulceration have increased baseline and response concentration of stress hormones and behave differently than control horses. We investigated stomachs of 96 horses at one stud, and compared an ulcer group (n = 30; with severe lesions in the glandular...... conclude that the prevalence of gastric ulcers was high, and our results suggest different factors affecting ulceration in the glandular versus the nonglandular region of the horse stomach. Obvious external signs (e.g. poor body condition) identifying ulcer horses were absent. Horses with severe glandular...

  6. Genetic diversity in German draught horse breeds compared with a group of primitive, riding and wild horses by means of microsatellite DNA markers.

    Science.gov (United States)

    Aberle, K S; Hamann, H; Drögemüller, C; Distl, O

    2004-08-01

    We compared the genetic diversity and distance among six German draught horse breeds to wild (Przewalski's Horse), primitive (Icelandic Horse, Sorraia Horse, Exmoor Pony) or riding horse breeds (Hanoverian Warmblood, Arabian) by means of genotypic information from 30 microsatellite loci. The draught horse breeds included the South German Coldblood, Rhenish German Draught Horse, Mecklenburg Coldblood, Saxon Thuringa Coldblood, Black Forest Horse and Schleswig Draught Horse. Despite large differences in population sizes, the average observed heterozygosity (H(o)) differed little among the heavy horse breeds (0.64-0.71), but was considerably lower than in the Hanoverian Warmblood or Icelandic Horse population. The mean number of alleles (N(A)) decreased more markedly with declining population sizes of German draught horse breeds (5.2-6.3) but did not reach the values of Hanoverian Warmblood (N(A) = 6.7). The coefficient of differentiation among the heavy horse breeds showed 11.6% of the diversity between the heavy horse breeds, as opposed to 21.2% between the other horse populations. The differentiation test revealed highly significant genetic differences among all draught horse breeds except the Mecklenburg and Saxon Thuringa Coldbloods. The Schleswig Draught Horse was the most distinct draught horse breed. In conclusion, the study demonstrated a clear distinction among the German draught horse breeds and even among breeds with a very short history of divergence like Rhenish German Draught Horse and its East German subpopulations Mecklenburg and Saxon Thuringa Coldblood.

  7. Gc globulin as a diagnostic and prognostic marker in horses

    DEFF Research Database (Denmark)

    Pihl, Tina Holberg

    can prevent development of shock and thereby increase survival chances. The in vivo toxicity of Gc-globulin infusion is currently being investigated in horses and other species. Gc-globulin has been demonstrated in horse plasma and its structure closely resembles that of human Gc-globulin. Gc......-globulin concentrations in horses under clinical conditions have never previously been investigated. The Ph.D. project focuses on Gc-globulin as a prognostic marker in horses with acute abdominal pain....

  8. An environmental overview of the Cat Arm hydroelectric development

    International Nuclear Information System (INIS)

    Barnes, J.L.

    1987-01-01

    The Cat Arm Dam hydroelectric development in Newfoundland comprises 10 dams, three tunnels, two canals and a 127 MW powerhouse. The scheme develops 127 MW from 380.5 m of head and comprises: ten dams of varying heights up to 53 m; a bathtub type overflow spillway 330 m in length; a 230 m long inverted U-shaped diversion tunnel; an 800 m long, inverted U-shaped low pressure forebay tunnel; two bog and rock cut tunnels leading to and from the forebay tunnels; a surface powerhouse containing two Pelton turbines; and a 178 km long, 230 kV transmission line. An overview is provided of the environmental assessment, project impacts, and cost of environmental protection associated with the project. Impacts were centered around fish and aquatic life in the created reservoir and downstream of the powerhouse, loss of ungulate (moose and caribou) habitat due to flooding, loss of forestry resources due to flooding, and the disturbance of land during construction. The overall cost of environmental protection was $7,977,000, only 2% of the total project cost. 17 refs., 1 tab

  9. Sustainable siting procedure of small hydroelectric plants: The Greek experience

    International Nuclear Information System (INIS)

    Tsoutsos, Theocharis; Maria, Efpraxia; Mathioudakis, Vassilis

    2007-01-01

    This paper aims to present the procedure under which a sustainable plant, like a small hydroelectric plant (SHP), can be installed and deployed, especially in countries with complicated administrative and legislative systems. Those must be defined by the rules that characterize sustainable spatial planning, which aims at the environmental protection, the insurance of better living conditions and finally at the economic development within the frame of the principle of sustainability and its three basic dimensions: social, economical and environmental. The main principles of spatial planning are accepted from the jurisprudence of the Hellenic Council of State, either as an appropriate condition for the protection of important ecosystems or as specific expression of the principle of prevention of environmental damage. In this framework it is accepted that the development is experienced, initially to a total and general planning, whose essential part is the assessment and modification of distributed land uses. Besides, the main characteristics of the siting of SHPs and the criteria demanded for their smooth integration and operation are presented

  10. Hydroelectric power plant with variable flow on drinking water adduction

    Science.gov (United States)

    Deaconu, S. I.; Babău, R.; Popa, G. N.; Gherman, P. L.

    2018-01-01

    The water feeding system of the urban and rural localities is mainly collected with feed pipes which can have different lengths and different levels. Before using, water must be treated. Since the treatment take place in the tanks, the pressure in the inlet of the station must be diminished. Many times the pressure must be reduced with 5-15 Barr and this is possible using valves, cavils, and so on. The flow capacity of the water consumption is highly fluctuating during one day, depending on the season, etc. This paper presents a method to use the hydroelectric potential of the feed pipes using a hydraulic turbine instead of the classical methods for decreasing the pressure. To avoid the dissipation of water and a good behavior of the power parameters it is used an asynchronous generator (AG) which is coupled at the electrical distribution network through a static frequency converter (SFC). The turbine has a simple structure without the classical devices (used to regulate the turbine blades). The speed of rotation is variable, depending on the necessary flow capacity in the outlet of the treatment station. The most important element of the automation is the static frequency converter (SFC) which allows speeds between 0 and 1.5 of the rated speed of rotation and the flow capacity varies accordingly with it.

  11. Have Norwegian producers of hydroelectric power wasted the water?

    International Nuclear Information System (INIS)

    2003-01-01

    Norwegian producers of hydroelectric power have been criticized for having exported power to Sweden during the autumn and winter 2003/2004. As this analysis shows, although the reservoir level in Norway was below normal in October already, the negative deviation from the normal reservoir level was even greater in Sweden till the end of the year. Also when the magnitude of the reserve is measured relative to the number of weeks with normal winter production for which it lasts, the situation was worse in Sweden than in Norway. After New Year the deviation from the normal reservoir level has been much the same in the two countries and has changed in parallel. During this period the exchange between the two countries has approximately balanced and the power flow from Sweden to Norway has grown gradually. With this as a background, there is no basis for asserting that the Norwegian producers have managed the water resources in an irresponsible way. In general, the power flow and the water resource management in the two countries appear reasonable considering the water influx and the prices. Different market imperfections may nevertheless have rendered the water resource management socially less then optimal.

  12. The Manitoba Hydro-Electric Board 50. annual report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-07-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs.

  13. Counter rotating type hydroelectric unit suitable for tidal power station

    International Nuclear Information System (INIS)

    Kanemoto, T; Suzuki, T

    2010-01-01

    The counter rotating type hydroelectric unit, which is composed of the axial flow type tandem runners and the peculiar generator with double rotational armatures,was proposed to utilize effectively the tidal power. In the unit, the front and the rear runners counter drive the inner and the outer armatures of the generator, respectively. Besides, the flow direction at the rear runner outlet must coincide with the flow direction at the front runner inlet, because the angular momentum through the rear runner must coincides with that through the front runner. That is, the flow runs in the axial direction at the rear runner outlet while the axial inflow at the front runner inlet. Such operations are suitable for working at the seashore with rising and falling tidal flows, and the unit may be able to take place of the traditional bulb type turbines. The tandem runners were operated at the on-cam conditions, in keeping the induced frequency constant. The output and the hydraulic efficiency are affected by the adjustment of the front and the blade setting angles. The both optimum angles giving the maximum output and/or efficiency were presented at the various discharges/heads. To promote more the tidal power generation by this type unit, the runners were also modified so as to be suitable for both rising and falling flows. The hydraulic performances are acceptable while the output is determined mainly by the trailing edge profiles of the runner blades.

  14. Hydroelectric power and global environmental problems: benefits and environmental impacts

    International Nuclear Information System (INIS)

    Chabot, B.

    1992-01-01

    The risk of global warming is one of the most serious global environmental problems. It is due to the increase of greenhouse gases emissions, mainly because of the use of fossil fuels in the energy sector, particularly for electricity generation. At an international level, experts now agree that measures are to be taken to reduce this risk. In the energy sector, an improvement of energy efficiency and an increase of nuclear electricity generation are often presented as the best available solutions. Renewable energy sources are often presented as a solution with a negligible potential impact, and sometimes, hydro power is even forgotten, or its coasts and its potential impacts on local environment are presented as an obstacle to its positive contribution to the reduction of global warming risk. Without denying the positive impacts of other solutions, this paper explains the possibilities and the benefits of an increased use of hydroelectric power, when implemented with a minimum impact on local environment and with a synergistic effect with the rational use of generated energy, in order to have access to a sustainable development. 19 refs., 6 figs

  15. Joint Venture Modes of Water Conservancy and Hydroelectric Engineering

    Directory of Open Access Journals (Sweden)

    Zhiding Chen

    2013-07-01

    Full Text Available With the long construction period, the giant scope and complex technology, water conservancy and hydroelectric engineering construction has large investment. In the fully competitive water conservancy and hydropower project construction contracting market, it is almost impossible for a company to contract with a water conservancy and hydropower project independently. Therefore, water conservancy and hydropower project construction can be contracted by several construction companies together, to play each company's strengths, lower offer, improve project quality, shorten the construction period and win the competition. In this paper, we started from the definition of Joint Venture, summed up the forms of Joint Venture in water conservancy and hydropower engineering, proposed that the JV modes can be divided into domestic and international union, tight mode, half-tight mode, loose mode, incorporation and consortium. Furthermore, we analyzed the advantages and disadvantages of Joint Venture. Put forward that the JV can relieve the owner from interfacial administrative work, reduce risk of engineering, and raise the success rate of engineering contract, improve the correctness of price and increase the opportunity of project contracting, Learn from other members, enhance technology and management and make full use of idle resources

  16. Cordova Lake dam hydroelectric generating station case study

    International Nuclear Information System (INIS)

    Kerr, D.; Huxley, J.

    1993-01-01

    The Ontario Ministry of Natural Resources released a Crown owned site to the private water power industry as part of the small hydro site release program initiated by the Ontario Government in the mid 1980's. The Cordova Lake Dam Hydroelectric Generating Station, built on this site, has been in operation since the first week of October, 1992. Since that time, the plant has been operating with less than 1 % down time and has generated over 2,400 MWh of electricity. Algonquin Power Systems is responsible for the management and operations of the plant which includes full time monitoring from the company's Mississauga office and a part time employee at Cordova Lake. Cordova Lake Dam is located on the Crowe River at the outlet of Cordova Lake, approximately 125 kilometers east of Toronto, Ontario. The total cost of the Cordova Lake Dam project was $1.6 million. Algonquin Power contributed 20% equity to the project. Algonquin Power was also responsible for all engineering and geotechnical work and for completing the construction and equipment contracts. 1 tab., 2 figs

  17. Small hydro-electric potential: west Poverty Bay region

    Energy Technology Data Exchange (ETDEWEB)

    1981-07-01

    This study has identified six schemes in the Bay of Plenty Electric Power Board area and two in the Poverty Bay Electric Power Board area, of which five and one, respectively, are below the economic limit of $2400/kW suggested by the Ministry of Works and Development as of December 1979. Of these, only three appear both economically and environmentally acceptable. The Takaputahi and Torere schemes are not likely to proceed if the Ministry of Works and Development continue with their plans to develop the Motu River. Furthermore, the Motu Falls scheme is unlikely to proceed for environmental reasons. The schemes identified are not very attractive on the national scale and could not be justified on local terms. However, a detailed feasibility study of the Takaputahi/Torere diversion should be undertaken prior to a decision being made to proceed with the Motu development, or if the proposals are dropped. The present low load and slow growth of the area is such that prior to a small hydro-electric scheme being built, there would need to be an established demand for power.

  18. Influence of environmental factors on mercury release in hydroelectric reservoirs

    Energy Technology Data Exchange (ETDEWEB)

    Morrison, K.; Therien, N.

    1991-04-01

    Due to increased mercury concentrations in fish in hydro-electric reservoirs after flooding, a study was carried out to evaluate the release and transformation of mercury due to vegetation and soil flooded as a result of reservoir creation. Samples of vegetation and soils were immersed in water and concentrations of total mercury, methylmercury and nutrients were followed. The effects of anoxia, pH and temperature on release and transformation were examined. An existing dynamic model of decomposition of flooded materials in reservoirs was modified to include mercury release and transformation, and was calibrated to the experimental data. Amounts of mercury released by the different substrates was of the same order of magnitude. Tree species contributed to the greatest amounts of methylmercury per unit biomass, but the biomass used for these was twigs and foliage. Soil released significant amounts of mercury, but methylation was very low. The model was able to fit well for all substrates except lichen. The model can be adapted to proposed reservoirs to predict nutrient and mecury release and transformation. 175 refs., 38 figs., 38 tabs.

  19. The Manitoba Hydro-Electric Board 50. annual report

    International Nuclear Information System (INIS)

    2001-01-01

    This document presents the financial statements for The Manitoba Hydro-Electric Board (Manitoba Hydro) for the fiscal year ended March 31, 2001. Manitoba Hydro was proud to report no electricity rate increase for the period 2000-2001, a feat realized for the fifth consecutive year for most customer groups. Financial and production highlights were first presented, followed by the vision mission and goals of Manitoba Hydro. Manitoba Hydro serves 403 000 customers in the province with electric energy, and 248 000 customers with natural gas service mainly in the south of the province. Electricity export sale agreements are in place with more than 35 utilities and marketers in the United States, Ontario and Saskatchewan. Self-renewing waterpower is used to generate the bulk of the electricity. The transmission and distribution lines stretch over 100 000 kilometres. Manitoba Hydro is the fourth largest energy utility in Canada based on capital assets. A review of the year was presented, as well as a brief historical overview of Manitoba Hydro. The financial review section discussed the management report, the Auditor's report. Included in this section were various statement sheets, namely the consolidated statement of income and retained earnings, consolidated balance sheet, consolidated statement of cash flows, followed by some notes to the consolidated financial statements. Consolidated financial statistics and operating statistics - 10-year overview were presented. A brief presentation of the Board members and senior officers ended this report. tabs. figs

  20. Culinary and pressure irrigation water system hydroelectric generation

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, Cory [Water Works Engineers, Pleasant Grove City, UT (United States)

    2016-01-29

    Pleasant Grove City owns and operates a drinking water system that included pressure reducing stations (PRVs) in various locations and flow conditions. Several of these station are suitable for power generation. The City evaluated their system to identify opportunities for power generation that can be implemented based on the analysis of costs and prediction of power generation and associated revenue. The evaluation led to the selection of the Battle Creek site for development of a hydro-electric power generating system. The Battle Creek site includes a pipeline that carries spring water to storage tanks. The system utilizes a PRV to reduce pressure before the water is introduced into the tanks. The evaluation recommended that the PRV at this location be replaced with a turbine for the generation of electricity. The system will be connected to the utility power grid for use in the community. A pelton turbine was selected for the site, and a turbine building and piping system were constructed to complete a fully functional power generation system. It is anticipated that the system will generate approximately 440,000 kW-hr per year resulting in $40,000 of annual revenue.

  1. Mitigative measures for the Laforge-2 hydroelectric development

    International Nuclear Information System (INIS)

    Faucher, O.; Gagnon, R.

    1995-01-01

    Corrective, preventive and enhancement measures undertaken as part of the development of the Laforge-2 Hydroelectric Power Plant, were described. The environment into which the project has been integrated was also described. General background information and technical characteristics of the Laforge-2 and Caniapiscau-Laforge diversion were provided. The Laforge-2 Mitigative Master Plan's measures for improving wildlife potential, cleaning-up of tributaries, protecting wildlife habitats, seeding around ponds and humid zones, installing platforms to encourage and facilitate the nesting of ospreys, and promoting proper harvesting of the territory, were described as corrective measures that will promote sustainable development. Contractual obligations to protect the environment were outlined. Enhancement measures described included reclamation of areas disturbed during construction, landscaping around main structures and construction of scenic lookouts. It was fully expected that the mitigative measures described for the Laforge-2 project will minimize negative impacts of the project and will maximize positive ones by improving wildlife potential in areas near the reservoir. 5 figs

  2. [Equine dentistry: Survey on Swiss horse owners].

    Science.gov (United States)

    Schiesser, E; Geyer, H; Kummer, M; Jackson, M

    2017-08-01

    The interest in equine dentistry has significantly increased in the last 15 years. On the part of the veterinarians as well as of the horse owners there is a strong attention to the topic. The aim of the questionnaire was to investigate amongst horse owners what their level of information and preferences about dental treatment are and how they are implemented. The questionnaire was translated into the three national languages and included 20 questions about level and sources of information, frequency of treatments and the horse owner's stance over sedation of the animals. With a return rate of 45% (1'466 of 3'250 sent questionnaires) significant conclusions could be drawn. Horse owners showed a strong demand for clarification regarding tooth problems, the causes, consequences and methods of treatment. More than half of the owners considered themselves not well informed. The treating person was in 66.7% a veterinarian with a special education. Horse owners indicated that information circulated most frequently by word of mouth recommendations and they explicitly wished information from professional and reliable sources. The questionnaire provided a clear result about current equine dental treatments. We suggest that they should be performed by veterinarians only with a special education.

  3. Life Cycle Assessment of Horse Manure Treatment

    Directory of Open Access Journals (Sweden)

    Ola Eriksson

    2016-11-01

    Full Text Available Horse manure consists of feces, urine, and varying amounts of various bedding materials. The management of horse manure causes environmental problems when emissions occur during the decomposition of organic material, in addition to nutrients not being recycled. The interest in horse manure undergoing anaerobic digestion and thereby producing biogas has increased with an increasing interest in biogas as a renewable fuel. This study aims to highlight the environmental impact of different treatment options for horse manure from a system perspective. The treatment methods investigated are: (1 unmanaged composting; (2 managed composting; (3 large-scale incineration in a waste-fired combined heat and power (CHP plant; (4 drying and small-scale combustion; and (5 liquid anaerobic digestion with thermal pre-treatment. Following significant data uncertainty in the survey, the results are only indicative. No clear conclusions can be drawn regarding any preference in treatment methods, with the exception of their climate impact, for which anaerobic digestion is preferred. The overall conclusion is that more research is needed to ensure the quality of future surveys, thus an overall research effort from horse management to waste management.

  4. Pharmacokinetics of procaterol in thoroughbred horses.

    Science.gov (United States)

    Kusano, K; Nomura, M; Toju, K; Ishikawa, Y; Minamijima, Y; Yamashita, S; Nagata, S

    2016-06-01

    Procaterol (PCR) is a beta-2-adrenergic bronchodilator widely used in Japanese racehorses for treating lower respiratory disease. The pharmacokinetics of PCR following single intravenous (0.5 μg/kg) and oral (2.0 μg/kg) administrations were investigated in six thoroughbred horses. Plasma and urine concentrations of PCR were measured using liquid chromatography-mass spectrometry. Plasma PCR concentration following intravenous administration showed a biphasic elimination pattern. The systemic clearance was 0.47 ± 0.16 L/h/kg, the steady-state volume of the distribution was 1.21 ± 0.23 L/kg, and the elimination half-life was 2.85 ± 1.35 h. Heart rate rapidly increased after intravenous administration and gradually decreased thereafter. A strong correlation between heart rate and plasma concentration of PCR was observed. Plasma concentrations of PCR after oral administration were not quantifiable in all horses. Urine concentrations of PCR following intravenous and oral administrations were quantified in all horses until 32 h after administration. Urine PCR concentrations were not significantly different on and after 24 h between intravenous and oral administrations. These results suggest that the bioavailability of orally administrated PCR in horses is very poor, and the drug was eliminated from the body slowly based on urinary concentrations. This report is the first study to demonstrate the pharmacokinetic character of PCR in thoroughbred horses. © 2015 John Wiley & Sons Ltd.

  5. 9 CFR 93.326 - Horses for immediate slaughter.

    Science.gov (United States)

    2010-01-01

    ... CERTAIN ANIMALS, BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses Mexico 18 § 93.326 Horses for immediate slaughter. Horses may be imported from Mexico, subject to the applicable provisions of §§ 93.321, 93.322...

  6. 9 CFR 93.322 - Declaration for horses.

    Science.gov (United States)

    2010-01-01

    ... CERTAIN ANIMALS, BIRDS, FISH, AND POULTRY, AND CERTAIN ANIMAL, BIRD, AND POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses Mexico 18 § 93.322 Declaration for horses. For all horses offered for importation from Mexico, the importer or his or her agent shall present two...

  7. We know next to nothing about vitamin D in horses!

    DEFF Research Database (Denmark)

    Hymøller, Lone; Jensen, Søren Krogh

    2015-01-01

    Very few references on vitamin D in horses exist, but the limited research available suggests that the vitamin D physiology of horses may be very different from other species. Horses can obtain vitamin D both through endogenous synthesis in the skin during sunlight exposure and through dietary so...

  8. Micro-Doppler classification of riders and riderless horses

    Science.gov (United States)

    Tahmoush, David

    2014-05-01

    Micro-range Micro-Doppler can be used to isolate particular parts of the radar signature, and in this case we demonstrate the differences in the signature between a walking horse versus a walking horse with a rider. Using micro-range micro-Doppler, we can distinguish the radar returns from the rider as separate from the radar returns of the horse.

  9. Internal Fixation of Cervical Fractures in Three Horses.

    Science.gov (United States)

    Rossignol, Fabrice; Brandenberger, Olivier; Mespoulhes-Rivière, Céline

    2016-01-01

    To describe the surgical treatment outcome of cervical fractures in 3 horses. Case report. Three client-owned horses with cervical vertebral fractures. Three horses were refered for neck stiffness, pain, and ataxia after a cervical trauma because of a fall. Radiographic examination showed an oblique displaced fracture of the caudal aspect of the body of the second cervical vertebra (C2) in horse 1, an oblique displaced fracture of the caudal aspect of C4 involving the disc between C4 and C5 in horse 2, and a displaced transverse fracture of the body of the axis (C2) extending to the lateral arches and involving the vertebral canal in horse 3. In horse 1, the fracture was reduced and stabilized using a 14-hole narrow DCP plate, applied ventrally, and fixed with cancellous screws. A cervical fusion was performed. In horses 2 and 3, fracture fixation was performed using a 5-hole narrow LCP and 5 mm locking screws. All horses showed improvement and returned to full activity. The fracture healed in all horses. Internal fixation of cervical fracture in these horses was associated with minimal complications, and was associated with healing and a highly functional outcome in all horses. The LCP was preferred and would be recommended for ventral stabilization of selected cases of vertebral fractures. © Copyright 2015 by The American College of Veterinary Surgeons.

  10. Navicular bone fracture in the pelvic limb in two horses

    International Nuclear Information System (INIS)

    Kaser-Hotz, B.; Ueltschi, G.; Hess, N.

    1991-01-01

    The case history, radiographic and scintigraphic findings of two horses with pelvic limb navicular bone fractures are presented. In both cases the fractures were of traumatic origin. One horse had a bilateral fracture of the navicular bone, distal border, the other horse had a fracture of the proximal articular border in one pelvic limb navicular bone

  11. Plasma serotonin in horses undergoing surgery for small intestinal colic

    NARCIS (Netherlands)

    Torfs, Sara C; Maes, An A; Delesalle, Catherine J; Pardon, Bart; Croubels, Siska M; Deprez, Piet

    This study compared serotonin concentrations in platelet poor plasma (PPP) from healthy horses and horses with surgical small intestinal (SI) colic, and evaluated their association with postoperative ileus, strangulation and non-survival. Plasma samples (with EDTA) from 33 horses with surgical SI

  12. An intestinal Trojan horse for gene delivery.

    Science.gov (United States)

    Peng, Haisheng; Wang, Chao; Xu, Xiaoyang; Yu, Chenxu; Wang, Qun

    2015-03-14

    The intestinal epithelium forms an essential element of the mucosal barrier and plays a critical role in the pathophysiological response to different enteric disorders and diseases. As a major enteric dysfunction of the intestinal tract, inflammatory bowel disease is a genetic disease which results from the inappropriate and exaggerated mucosal immune response to the normal constituents in the mucosal microbiota environment. An intestine targeted drug delivery system has unique advantages in the treatment of inflammatory bowel disease. As a new concept in drug delivery, the Trojan horse system with the synergy of nanotechnology and host cells can achieve better therapeutic efficacy in specific diseases. Here, we demonstrated the feasibility of encapsulating DNA-functionalized gold nanoparticles into primary isolated intestinal stem cells to form an intestinal Trojan horse for gene regulation therapy of inflammatory bowel disease. This proof-of-concept intestinal Trojan horse will have a wide variety of applications in the diagnosis and therapy of enteric disorders and diseases.

  13. Cervical myelography with iohexol in horses

    International Nuclear Information System (INIS)

    Fialho, S.A.G.; Graca, D.L.; Silva, A.M. da; Pellegrine, L.C. de; Oliveira, L.S.S. de; Lopes, S.T.D.A.

    1989-01-01

    Five horses, weighing 337 to 400 kg, were used in this research, one of them being used as control. Cervical myelography with iohexol (Omnipaque) was performed on four horses tranquilized with flunitrazepan before induction of anesthesia with sodium thiopental. Anesthesia was maintained with fluothane and oxygen. Cerebrospinal fluid (CSF) was analysed before and after an injection of ioxheol into the subarachnoid space. The animals received 25 to 50 ml of iohexol, after removal of 20 ml cerebrospinal fluid. Radiographies were taken with the horses at lateral recumbency, and the cranial, central and caudal regions of the cervical spine being focalized. No significant changes occurred in the cerebrospinal fluid after injecting the contrast medium. Pathologic changes were not found by gross or microscopic examination of the brain and the cervical spinal cord. Radiographies of good to excellent image quality were obtained. At autopsy, radiographic diagnosis of cervical vertebral instability was confirmed in the animal that had pelvic limb ataxia

  14. Cervical myelography with iohexol in horses

    Energy Technology Data Exchange (ETDEWEB)

    Fialho, S. A.G.; Graca, D. L.; Silva, A.M. da; Pellegrine, L.C. de; Oliveira, L. S.S. de; Lopes, S. T.D.A.

    1989-08-15

    Five horses, weighing 337 to 400 kg, were used in this research, one of them being used as control. Cervical myelography with iohexol (Omnipaque) was performed on four horses tranquilized with flunitrazepan before induction of anesthesia with sodium thiopental. Anesthesia was maintained with fluothane and oxygen. Cerebrospinal fluid (CSF) was analysed before and after an injection of ioxheol into the subarachnoid space. The animals received 25 to 50 ml of iohexol, after removal of 20 ml cerebrospinal fluid. Radiographies were taken with the horses at lateral recumbency, and the cranial, central and caudal regions of the cervical spine being focalized. No significant changes occurred in the cerebrospinal fluid after injecting the contrast medium. Pathologic changes were not found by gross or microscopic examination of the brain and the cervical spinal cord. Radiographies of good to excellent image quality were obtained. At autopsy, radiographic diagnosis of cervical vertebral instability was confirmed in the animal that had pelvic limb ataxia.

  15. Genetic variability of Italian Heavy Draught Horse

    Directory of Open Access Journals (Sweden)

    Fabio Maretto

    2010-01-01

    Full Text Available This study aimed to analyze the genetic variability of the Italian Heavy Draught Horse (IHDH breed using a panel of 23 microsatellite markers. We also compared the population structure of the IHDH to other two unrelated breeds (Italian Haflinger, IH and Quarter Horse, QH. The IHDH showed a genetic variability comparable with other European heavy draught horse breeds and with the IH and QH breeds analyzed. Clustering analyses using a posterior Bayesian approach clearly differentiated the three breeds; it also showed a fragmentation of the IHDH in three subpopulations that need to be further investigated. These findings are an indicator of the present situation of the IHDH and will contribute to the conservation and implementation of the selection programme for this breed.

  16. Methane and CO2 emissions from China's hydroelectric reservoirs: a new quantitative synthesis.

    Science.gov (United States)

    Li, Siyue; Zhang, Quanfa; Bush, Richard T; Sullivan, Leigh A

    2015-04-01

    Controversy surrounds the green credentials of hydroelectricity because of the potentially large emission of greenhouse gases (GHG) from associated reservoirs. However, limited and patchy data particularly for China is constraining the current global assessment of GHG releases from hydroelectric reservoirs. This study provides the first evaluation of the CO2 and CH4 emissions from China's hydroelectric reservoirs by considering the reservoir water surface and drawdown areas, and downstream sources (including spillways and turbines, as well as river downstream). The total emission of 29.6 Tg CO2/year and 0.47 Tg CH4/year from hydroelectric reservoirs in China, expressed as CO2 equivalents (eq), corresponds to 45.6 Tg CO2eq/year, which is 2-fold higher than the current GHG emission (ca. 23 Tg CO2eq/year) from global temperate hydropower reservoirs. China's average emission of 70 g CO2eq/kWh from hydropower amounts to 7% of the emissions from coal-fired plant alternatives. China's hydroelectric reservoirs thus currently mitigate GHG emission when compared to the main alternative source of electricity with potentially far great reductions in GHG emissions and benefits possible through relatively minor changes to reservoir management and design. On average, the sum of drawdown and downstream emission including river reaches below dams and turbines, which is overlooked by most studies, represents the equivalent of 42% of the CO2 and 92% of CH4 that emit from hydroelectric reservoirs in China. Main drivers on GHG emission rates are summarized and highlight that water depth and stratification control CH4 flux, and CO2 flux shows significant negative relationships with pH, DO, and Chl-a. Based on our finding, a substantial revision of the global carbon emissions from hydroelectric reservoirs is warranted.

  17. 9 CFR 93.304 - Import permits for horses from regions affected with CEM and for horse specimens for diagnostic...

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Import permits for horses from regions affected with CEM and for horse specimens for diagnostic purposes; reservation fees for space at quarantine... POULTRY PRODUCTS; REQUIREMENTS FOR MEANS OF CONVEYANCE AND SHIPPING CONTAINERS Horses § 93.304 Import...

  18. Project authorization process in the thermal power stations vs in the hydroelectric power stations: two weights, two measurements?

    International Nuclear Information System (INIS)

    Comtois, Y.

    2004-01-01

    Key topics include the long tendering process, a comparison of two projects: thermal station vs. hydroelectrical station, and the solutions towards reducing the delay in obtaining authorization. (author)

  19. Horse manure as feedstock for anaerobic digestion.

    Science.gov (United States)

    Hadin, Sa; Eriksson, Ola

    2016-10-01

    Horse keeping is of great economic, social and environmental benefit for society, but causes environmental impacts throughout the whole chain from feed production to manure treatment. According to national statistics, the number of horses in Sweden is continually increasing and is currently approximately 360,000. This in turn leads to increasing amounts of horse manure that have to be managed and treated. Current practices could cause local and global environmental impacts due to poor performance or lack of proper management. Horse manure with its content of nutrients and organic material can however contribute to fertilisation of arable land and recovery of renewable energy following anaerobic digestion. At present anaerobic digestion of horse manure is not a common treatment. In this paper the potential for producing biogas and biofertiliser from horse manure is analysed based on a thorough literature review in combination with mathematical modelling and simulations. Anaerobic digestion was chosen as it has a high degree of resource conservation, both in terms of energy (biogas) and nutrients (digestate). Important factors regarding manure characteristics and operating factors in the biogas plant are identified. Two crucial factors are the type and amount of bedding material used, which has strong implications for feedstock characteristics, and the type of digestion method applied (dry or wet process). Straw and waste paper are identified as the best materials in an energy point of view. While the specific methane yield decreases with a high amount of bedding, the bedding material still makes a positive contribution to the energy balance. Thermophilic digestion increases the methane generation rate and yield, compared with mesophilic digestion, but the total effect is negligible. Copyright © 2016. Published by Elsevier Ltd.

  20. Glucocorticoids and laminitis in the horse.

    Science.gov (United States)

    Johnson, Philip J; Slight, Simon H; Ganjam, Venkataseshu K; Kreeger, John M

    2002-08-01

    The administration of exogenously administered GCs and syndromes associated with GC excess are both attended by increased risk for the development of laminitis in adult horses. However, there exists substantial controversy as to whether excess GCs cause laminitis de novo. If true, the pathogenesis of laminitis arising from the effects of GC excess is probably different from that associated with diseases of the gastrointestinal tract and endotoxemia. Although a satisfactory explanation for the development of laminitis as a consequence of GC action is currently lacking, numerous possible and plausible theoretical mechanisms do exist. Veterinarians must exert caution with respect to the use of GCs in adult horses. The extent to which individual horses are predisposed to laminitis as a result of GC effect cannot be predicted based on current information. However, the administration of systemic GCs to horses that have been previously affected by laminitis should be used only with extreme caution, and should be accompanied by careful monitoring for further signs of laminitis. The risk of laminitis appears to be greater during treatment using some GCs (especially dexamethasone and triamcinalone) compared with others (prednisone and prednisolone). Whenever possible, to reduce the risk of laminitis, GCs should be administered locally. For example, the risk of GC-associated laminitis is evidently considerably reduced in horses affected with chronic obstructive pulmonary disease (COPD) if GC treatment is administered via inhalation. We have hypothesized that structural changes in the equine hoof that resemble laminitis may arise as a consequence of excess GC effect. Although these changes are not painful per se, and are not associated with inflammation, they could likely predispose affected horses to the development of bona fide laminitis for other reasons. Moreover, the gross morphological appearance of the chronically GC-affected hoof resembles that of a chronically

  1. Horse keeping in peri-urban areas

    OpenAIRE

    Elgåker, Hanna

    2011-01-01

    The number of horses in Sweden has increased from 70 000 to almost 300 000 in 30 years. Today these horses are to a large extent kept for the purpose of hobby and leisure and create a substantial land use but link a diverse and a large amount of activities in peri-urban areas in Sweden. The sector contributes with new economic, social and physical possibilities, but also with conflicts between various stakeholders and interests. The overall aim of this work was to contribute to increased unde...

  2. Water homeostasis and diabetes insipidus in horses.

    Science.gov (United States)

    Schott, Harold C

    2011-04-01

    Diabetes insipidus (DI) is a rare disorder of horses characterized by profound polyuria and polydipsia (PU/PD), which can be caused by loss of production of arginine vasopressin (AVP). This condition is termed neurogenic or central DI. DI may also develop with absence or loss of AVP receptors or activity on the basolateral membrane of collecting-duct epithelial cells. This condition is termed nephrogenic DI. Equine clinicians may differentiate true DI from more common causes of PU/PD by a systematic diagnostic approach. DI may not be a correctable disorder, and supportive care of affected horses requires an adequate water source. Copyright © 2011 Elsevier Inc. All rights reserved.

  3. Dominance and Leadership: Useful Concepts in Human–Horse Interactions?

    DEFF Research Database (Denmark)

    Hartmann, Elke; Christensen, Janne Winther; McGreevy, Paul D.

    2017-01-01

    of management scenarios, ranging from taking a horse out of its social group to the prospect of humans mimicking the horse's social system by taking a putative leadership role and seeking after an alpha position in the dominance hierarchy to achieve compliance. Yet, there is considerable debate about whether...... the roles horses attain in their social group are of any relevance in their reactions to humans. This article reviews the empirical data on social dynamics in horses, focusing on dominance and leadership theories and the merits of incorporating those concepts into the human–horse context. This will provide...

  4. The role of the horse in Europe. Editorial

    OpenAIRE

    Goodwin, D.; Davidson, N.

    1999-01-01

    The horse has a unique place in European society. Historically, it has played a major part in shaping political and agricultural advances. Today, the horse has diverse roles ranging from the companion and leisure horse, to the sporting athlete. The horse continues to work on the land in many European countries, it serves in the police and the armed forces, and in some regions is a source of food. This has resulted in a vast range of horse-human interactions and relationships. Despite the l...

  5. The Hydroelectric Business Unit of Ontario Power Generation Inc

    International Nuclear Information System (INIS)

    Gaboury, J.

    2001-01-01

    The focus of this presentation was on the generation and sale of electricity. Prior to deregulation, companies that generated electricity had a readily available customer base to whom the electricity could be sold. The author discussed some of the changes affecting the industry as a result of deregulation of the electricity market in Ontario: the increasing number of companies, as well as the increased number of generators supplying power within the province. Currently 85 per cent of the generation in Ontario is met by Ontario Power Generation (OPG) and this percentage will decrease through de-control. De-control can be achieved in a variety of ways, either through the sale of assets, leases, asset swaps. The market rules dictate that OPG not control in excess of 35 per cent of the generation supply in Ontario, OPG is examining the situation. New supply being constructed or new interconnections with neighboring markets could affect the total assets that would have to be de-controlled. OPG has a mix of generation that includes hydroelectric, fossil, and nuclear, as well as a single wind turbine. Green power, defined as electricity generation deemed less intrusive environmentally than most traditional generation, includes wind, water, landfill gas, solar and others, and could affect the mix of generation. It is expected that there will be a niche market for green power, especially when one considers the reduction in emissions. It could represent a viable option for smaller startup companies, as less capital is required. The options for selling the power, either to the spot market or by entering into a bilateral contract with another customer, were explained

  6. Hydro-electric power project on the Toulnustouc River

    International Nuclear Information System (INIS)

    Rochon, Y.; Morneau, J.; Lefebvre, G.

    2001-01-01

    Hydro-Quebec has proposed the development of a hydro-electric power project on the Toulnustouc River, located between Saint-Anne Lake and Manic Reservoir. The work would involve the construction of a power generation plant of 526 MW, construction of a 77 m dam on the Toulnustouc River, 14 km downstream from the existing Lac-Saint-Anne dam, the creation of a new water expanse covering 22 square kilometers, the construction of an embankment, the strengthening of the existing Saint-Anne embankment, digging a 9.8 km gallery, and the construction of a flood spillway. This work would have consequences for three different sectors of the river: between the existing and the proposed dam, between the dam and the projected power plant, and between the power plant and the limit of the influence of the reservoir Manic-2. Hydro-Quebec would like the work to begin in July 2001, with the aim of having the plant in operation in 2005. The overall cost of the project is estimated at 600 million dollars. It is expected that the economic benefits for the region would be in the 211 million dollar range. An environmental assessment of the entire project was performed by Quebec Ministere de l'Environnement. The authors determined that the project was recognized as justified by the Ministere des Ressources Naturelles (Natural Resources Ministry) and concluded that the project was acceptable from an environmental point of view as long as six conditions were met. They touched on the construction of a flood spillway capable of evacuating 19 cubic meters per second at any time during the year, that water be evacuated downstream following a pre-determined debit that varies according to the time of year, monitoring of the brook trout population and its habitat, and environmental monitoring. 46 refs., 7 tabs., 2 figs., 1 annex

  7. Enlarging the underground hydroelectric plant at Villarino, Spain

    Energy Technology Data Exchange (ETDEWEB)

    Oriard, L.L.

    1997-05-01

    Near the village of Villarino de los Aires, in the province of Salamanca, Spain, was an existing underground hydroelectric power plant. A major enlargement was undertaken to increase the electrical generating capacity, under a contract awarded to a joint venture of Dragados y Construcciones, S. A. (Spain), Entrecanales y Tavora, S. A. (Spain), and S.A. Conrad Zschokke (Switzerland). The enlargement required the excavation of a large and complex underground system of tunnels, shafts and chambers adjacent to existing facilities and interconnected with these facilities. The existing machine hall and transformer chamber were both extended, requiring the blasting of the existing end walls. The drilling, blasting and excavating of the underground system had to be done without damage to existing underground chambers and tunnels, or any of the existing structures, equipment or instrumentation facilities, often within just a few feet of the blasting. This required careful control of vibrations, airblast overpressures and dust. Because the only available non-electric detonating systems were found to be unreliable and unsafe, electric systems would be preferred if they could be used in a safe manner at this site. High electrical potentials existed at the site, and the facilities could not be shut down. Electrical fields were studied carefully, both in the underground environment and above the ground surface. Based on these results, it was concluded that electric detonators could be used if special blasting procedures were developed and followed. In accord with contracting practices of this Spanish agency, the contract was not awarded to the lowest bidder, but to the bidder who demonstrated the best understanding of the project and who presented the best technical proposal for conducting the work to a conclusion that would be satisfactory to the owner. The development of the technical proposal was a two-month effort for a technical group and support staff, prepared in Madrid.

  8. Leisure riding horses: research topics versus the needs of stakeholders.

    Science.gov (United States)

    Janczarek, Iwona; Wilk, Izabela

    2017-07-01

    Horses intended for leisure riding do not undergo any selection and most often retired sports horses or defective horses are chosen, as a low selling price determines their purchase by a leisure riding center. Unfortunately, horses bought at low prices usually have low utility value, are difficult to handle, require a special or individual approach and do not provide satisfaction in riding. However, neither modern horse breeding nor scientific research address the need to breed horses for leisure activities. There is no clear definition of a model leisure horse and criteria or information for its selection are not readily available in scientific publications. A wide spectrum of research methods may be used to evaluate various performance traits in horses intended for leisure activities. The fact that the population of recreational horses and their riders outnumber sporting horses should attract the special attention of scientific research. Their utility traits need to be determined with modern technology and methods in the same way they are for sporting horses. Such a system of evaluation would be very helpful for riders. © 2017 Japanese Society of Animal Science.

  9. European domestic horses originated in two holocene refugia.

    Directory of Open Access Journals (Sweden)

    Vera Warmuth

    2011-03-01

    Full Text Available The role of European wild horses in horse domestication is poorly understood. While the fossil record for wild horses in Europe prior to horse domestication is scarce, there have been suggestions that wild populations from various European regions might have contributed to the gene pool of domestic horses. To distinguish between regions where domestic populations are mainly descended from local wild stock and those where horses were largely imported, we investigated patterns of genetic diversity in 24 European horse breeds typed at 12 microsatellite loci. The distribution of high levels of genetic diversity in Europe coincides with the distribution of predominantly open landscapes prior to domestication, as suggested by simulation-based vegetation reconstructions, with breeds from Iberia and the Caspian Sea region having significantly higher genetic diversity than breeds from central Europe and the UK, which were largely forested at the time the first domestic horses appear there. Our results suggest that not only the Eastern steppes, but also the Iberian Peninsula provided refugia for wild horses in the Holocene, and that the genetic contribution of these wild populations to local domestic stock may have been considerable. In contrast, the consistently low levels of diversity in central Europe and the UK suggest that domestic horses in these regions largely derive from horses that were imported from the Eastern refugium, the Iberian refugium, or both.

  10. Public choice in water resource management: two case studies of the small-scale hydroelectric controversy

    Energy Technology Data Exchange (ETDEWEB)

    Soden, D.L.

    1985-01-01

    Hydroelectric issues have a long history in the Pacific Northwest, and more recently have come to focus on developing environmentally less-obtrusive means of hydroelectric generation. Small-scale hydroelectric represents perhaps the most important of these means of developing new sources of renewable resources to lessen the nation's dependence on foreign sources of energy. Each potential small-scale hydroelectric project, however, manifests a unique history which provides a highly useful opportunity to study the process of collective social choice in the area of new energy uses of water resources. Utilizing the basic concepts of public choice theory, a highly developed and increasingly widely accepted approach in the social sciences, the politicalization of small-scale hydroelectric proposals is analyzed. Through the use of secondary analysis of archival public opinion data collected from residents of the State of Idaho, and through the development of the two case studies - one on the Palouse River in Eastern Washington and the other at Elk Creek Falls in Northern Idaho, the policy relevant behavior and influence of major actors is assessed. Results provide a useful test of the utility of public-choice theory for the study of cases of natural-resources development when public involvement is high.

  11. Effects of repeated regrouping on horse behaviour and injuries

    DEFF Research Database (Denmark)

    Christensen, Janne Winther; Søndergaard, Eva; Thodberg, Karen

    2011-01-01

    about how repeated regrouping affect horse behaviour and welfare, and it is unknown whether horses may adapt to regrouping. In this study, we aimed to investigate the effects of an unstable group structure, caused by weekly regroupings, on behaviour and frequency of injuries in young horses. Forty...... after each regrouping (2 × 20 min/group/day). Injuries were scored by the end of the experimental period. The level of aggression shown by horses in Unstable groups immediately after regrouping was not affected by week (F5,35 = 0.42, P = 0.83), indicating that horses neither habituated, nor sensitized...... injuries were registered and there was no treatment effect (U = 184; P = 0.11). We conclude that the behaviour of young horses is affected by group management, and that horses appear not to adapt to weekly regroupings....

  12. Playing with fire - What is influencing horse owners' decisions to not vaccinate their horses against deadly Hendra virus infection?

    Directory of Open Access Journals (Sweden)

    Kailiea Arianna Goyen

    Full Text Available Hendra virus is a zoonotic paramyxovirus, which causes severe respiratory and neurological disease in horses and humans. Since 2012, the Hendra virus sub-unit G vaccine has been available for horse vaccination in Australia. Uptake of the vaccine has been limited and spill-over events of Hendra virus infection in horses continue to occur. We conducted an online, questionnaire-based cross-sectional study of 376 horse owners belonging to a variety of different equestrian clubs in Queensland, Australia, to identify risk factors for non-vaccination against Hendra virus. A total of 43.1% (N = 162 of horse owners indicated that they currently did not vaccinate against Hendra virus infection, while 56.9% (N = 214 currently vaccinated against Hendra virus infection. A total of 52 risk factors were evaluated relating to equestrian activities, horse management, perceived risk and severity of horse and human infection with Hendra virus, side effects of Hendra vaccination, other vaccinations conducted by horse owners and horse owners' attitudes towards veterinarians. The final multivariable logistics regression model identified the following risk factors associated with increased odds of non-vaccination against Hendra virus: 1 perceived low risk (compared to high of Hendra virus infection to horses (considering the horse owners' location and management practices or horse owners were unsure about the risk of infection, 2 perceived moderate severity (compared to very severe or severe of Hendra virus infection in humans, 3 horse owners non-vaccination of their pets, 4 horse owners non-vaccination against strangles disease in horses, 5 handling of more than three horses per week (compared to one horse only and 6 perceived attitude that veterinarians had a high motivation of making money from Hendra virus vaccination (compared to veterinarians having a low motivation of making money from Hendra virus vaccination. Horse owners were more likely to vaccinate against

  13. A survey on the feeding of eventing horses during competition.

    Science.gov (United States)

    Brunner, J; Wichert, B; Burger, D; von Peinen, K; Liesegang, A

    2012-10-01

    This study aims at the comparison of the actual feeding of horses with the recommendations from the literature, and it studies the effects of feeding and exercise on several blood metabolic parameters before and after exercise. Blood samples were collected from 25 horses during one-star eventing competitions and evaluated for blood glucose, insulin, lactate, free fatty acids and triglyceride levels. Questionnaires on the feeding practices of the horses were evaluated. The questionnaires revealed that during training, and on tournament days, horses received on average 4.3 kg of concentrate per day (min. 1.54 kg, max. 8 kg). The statistical analysis showed no significant effect of the amount of concentrate fed before exercise on the measured blood values. Oil was supplied as a supplementary energy source to 30% of the horses, but most of them only received very small quantities (0.02-0.4 l/day). Five horses (20%) had no access to salt supplements at all, and eleven horses (45%) had no access to salt on tournament days. Fifteen horses (60%) were supplied with mineral feed. Twenty-one horses (84%) had daily access to pasture during the training period. During competition, 55% of the horses received roughage ad libitum, compared with 37% during training. The majority of the horses received less roughage on days before the cross-country competition. It could not be ascertained whether feeding a large amounts of roughage had a beneficial effect on performance, because only a few horses in this study were fed with very restrictive roughage. Feeding of most of the horses was in agreement with the recommendations from the literature, except the need for sodium and chloride. The sodium and chloride need for sport horses may be overestimated in literature and needs to be re-evaluated. © 2012 Blackwell Verlag GmbH.

  14. Clinical and clinicopathological factors associated with survival in 44 horses with equine neorickettsiosis (Potomac horse Fever).

    Science.gov (United States)

    Bertin, F R; Reising, A; Slovis, N M; Constable, P D; Taylor, S D

    2013-01-01

    The epidemiology of equine neorickettsiosis (EN) has been extensively studied but limited clinical and clinicopathological data are available concerning naturally infected horses. Factors predictive of survival will be identified in horses diagnosed with EN. Convenience sample of 44 horses with EN admitted to 2 referral institutions. A retrospective study was performed. A diagnosis of EN was based on the presence of positive blood or fecal PCR. The most common clinical signs included diarrhea (66%), fever (50%), anorexia (45%), depression (39%), colic (39%), and lameness (18%). The median duration of hospitalization was 6 days and 73% of horses survived to discharge. Laminitis was present in 36% of horses, 88% of which were affected in all 4 feet. Serum creatinine and urea nitrogen concentrations, as well as RBC count, blood hemoglobin concentration, hematocrit, band neutrophils, serum AST activity, serum CK activity, and anion gap, were significantly (P < .05) higher in nonsurvivors. Serum chloride and sodium, concentrations as well as duration of hospitalization were significantly lower in nonsurvivors. The results of forward stepwise logistic regression indicated that blood hemoglobin concentration on admission and antimicrobial treatment with oxytetracycline were independent factors associated with survival. Severity of colitis as reflected by electrolyte loss, hemoconcentration, and prerenal azotemia were predictors of survival in horses diagnosed with EN. Treatment with oxytetracycline was associated with increased survival. Copyright © 2013 by the American College of Veterinary Internal Medicine.

  15. Adapting craniosacral therapy to treat horses

    Directory of Open Access Journals (Sweden)

    Weronika Kanik

    2017-01-01

    Full Text Available Craniosacral therapy is an acknowledged therapeutic method used for treating humans. It derives from osteopathy, being a manual technique which uses a very gentle touch. It consists in balancing the fluctuation of cerebrospinal fluid by applying appropriate holds that make it possible for the patientŐs organism to release tensions which have formed in tissues. The aim of the present work was to depict the possibility to adapt the method of craniosacral therapy used in humans to the therapy of horses. Thirteen therapeutic holds proposed for the treatment of horses were described and interpreted graphically on the basis of therapy of 62 horses with different disorders. A total of 241 craniosacral therapy treatments were performed. The adaptation of presented craniosacral therapy holds to equine therapy was developed by the first author on the basis of relevant holds used in the biodynamic craniosacral therapy in humans and in own therapeutic practice. The effects of own practice and data available in literature suggest that craniosacral therapy seems to be an effective method of improving the state of health of horses suffering from different complaints that may cause major difficulties in sport, breeding or private use of the animals. The use of thermography made it possible to record the effects of therapy and some processes accompanying it, which had been impossible before.

  16. Assessment of back pain in horses

    International Nuclear Information System (INIS)

    Cauvin, E.

    1997-01-01

    Back pain is common in horses yet, in many cases, a definitive diagnosis remains elusive. The aim of this article is to present a systematic approach to the patient with a suspected back problem. For the present purposes, back pain is defined as pain arising from the thoracolumbar or sacral spine and associated soft tissues. Examination of the pelvis is also included

  17. Theory of the Trojan-Horse method

    International Nuclear Information System (INIS)

    Baur, Gerhard; Typel, Stefan

    2004-01-01

    The Trojan-Horse method is an indirect approach to determine the energy dependence of S factors of astrophysically relevant two-body reactions. This is accomplished by studying closely related three-body reactions under quasi-free scattering conditions. The basic theory of the Trojan-Horse method is developed starting from a post-from distorted wave Born approximation of the T-matrix element. In the surface approximation the cross section of the three-body reaction can be related to the S-matrix elements of the two-body reaction. The essential feature of the Trojan-Horse method is the effective suppression of the Coulomb barrier at low energies for the astrophysical reaction leading to finite cross sections at the threshold of the two-body reaction. In a modified plane wave approximation the relation between the two-body and three-body cross sections becomes very transparent. Applications of the Trojan Horse Method are discussed. It is special interest that electron screening corrections are negligible due to the high projectile energy. (author)

  18. Theory of the Trojan-Horse method

    International Nuclear Information System (INIS)

    Typel, S.; Baur, G.

    2003-01-01

    The Trojan-Horse method is an indirect approach to determine the energy dependence of S factors of astrophysically relevant two-body reactions. This is accomplished by studying closely related three-body reactions under quasi-free scattering conditions. The basic theory of the Trojan-Horse method is developed starting from a post-form distorted wave Born approximation of the T-matrix element. In the surface approximation the cross-section of the three-body reaction can be related to the S-matrix elements of the two-body reaction. The essential feature of the Trojan-Horse method is the effective suppression of the Coulomb barrier at low energies for the astrophysical reaction leading to finite cross-sections at the threshold of the two-body reaction. In a modified plane wave approximation the relation between the two- and three-body cross-sections becomes very transparent. The appearing Trojan-Horse integrals are studied in detail

  19. The Trojan Horse Method in nuclear astrophysics

    International Nuclear Information System (INIS)

    Spitaleri, C.; Cherubini, S.; Del Zoppo, A.; Di Pietrob, A.; Figuerab, P.; Gulino, M.; Lattuadab, M.; Miljanic, Dstroke; Musumarra, A.; Pellegriti, M.G.; Pizzone, R.G.; Rolfs, C.; Romano, S.; Tudisco, S.; Tumino, A.

    2003-01-01

    The basic features of the Trojan Horse Method are discussed together with a review of recent applications, aimed to extract the bare astrophysical S(E)-factor for several two-body processes. In this framework information on electron screening potential U e was obtained from the comparison with direct experiments

  20. Designing Trojan Horses | Center for Cancer Research

    Science.gov (United States)

    Waging battle against cancer cells without inflicting damage on normal tissue has long been a goal for cancer treatment. A new type of drug called immunotoxins may help make this goal a reality. Much like the Greeks used a wooden horse to get soldiers inside the gates of Troy, immunotoxins use clever genetic engineering to get a lethal toxin inside cancer cells. Each

  1. Nuclear astrophysics and the Trojan Horse Method

    Energy Technology Data Exchange (ETDEWEB)

    Spitaleri, C. [University of Catania, Dipartimento di Fisica e Astronomia, Catania (Italy); Laboratori Nazionali del Sud - INFN, Catania (Italy); La Cognata, M.; Pizzone, R.G. [Laboratori Nazionali del Sud - INFN, Catania (Italy); Lamia, L. [University of Catania, Dipartimento di Fisica e Astronomia, Catania (Italy); Mukhamedzhanov, A.M. [Texas A and M University, Cyclotron Institute, College Station, TX (United States)

    2016-04-15

    In this review, we discuss the new recent results of the Trojan Horse Method that is used to determine reaction rates for nuclear processes in several astrophysical scenarios. The theory behind this technique is shortly presented. This is followed by an overview of some new experiments that have been carried out using this indirect approach. (orig.)

  2. Horse breed discrimination using machine learning methods

    Czech Academy of Sciences Publication Activity Database

    Burócziová, Monika; Riha, J.

    2009-01-01

    Roč. 50, č. 4 (2009), s. 375-377 ISSN 1234-1983 Institutional research plan: CEZ:AV0Z50450515 Keywords : Breed discrimination * Genetics diversity * Horse breeds Subject RIV: EG - Zoology Impact factor: 1.324, year: 2009

  3. Grief and Horses: Putting the Pieces Together

    Science.gov (United States)

    Symington, Ashley

    2012-01-01

    The effectiveness of grief counseling may be enhanced through the utilization of equine-assisted psychotherapy (EAP). An experiential, solution-focused, and natural approach, EAP provides clients with the opportunity to discover solutions to challenges that exist within themselves. Counselors and equine specialists team with horses to provide a…

  4. Subluxation of the Carpus in Thirteen Horses

    OpenAIRE

    Bailey, J.V.; Barber, S.M.; Fretz, P.B.; Jacobs, K.A.

    1984-01-01

    The records of 13 horses of various breeds with subluxation of the radiocarpal, intercarpal or carpometacarpal joint, or combinations of these were reviewed. Subluxation was most common at the carpometacarpal joint (n = 10) and concomitant fractures of individual carpal bones or metacarpus II and IV were seen (n = 12).

  5. General anesthesia for horses with specific problems

    International Nuclear Information System (INIS)

    Hodgson, D.S.; Dunlop, C.I.

    1990-01-01

    We have discussed anesthetic techniques, special considerations, and expected complications involved in anesthetizing horses for abdominal, orthopedic, and head and neck surgery, and myelography and have described expected physiologic dysfunction that may require changes in anesthetic technique or supportive measures. The objective is high-quality patient care and reduction in anesthesia-related morbidity and death

  6. Recent Studies on Trojan Horse Method

    International Nuclear Information System (INIS)

    Cherubini, S.; Spitaleri, C.; Gulino, M.

    2011-01-01

    The study of nuclear reactions that are important for the understanding of astrophysical problems received an increasing attention over the last decades. The Trojan Horse Method was proposed as a tool to overcome some of the problems connected with the measurement of cross-sections between charged particles at astrophysical energies. Here we present some recent studies on this method. (authors)

  7. Ocular findings in Quarter Horses with hereditary equine regional dermal asthenia.

    Science.gov (United States)

    Mochal, Cathleen A; Miller, William W; Cooley, A James; Linford, Robert L; Ryan, Peter L; Rashmir-Raven, Ann M

    2010-08-01

    To compare ocular structures of Quarter Horses homozygous for hereditary equine regional dermal asthenia (HERDA) with those of Quarter Horses not affected by HERDA (control horses) and to determine the frequency of new corneal ulcers for horses with and without HERDA during a 4-year period. Cohort study of ocular structures and retrospective case series of horses with and without HERDA. The cohort portion of the study involved 10 Quarter Horses with HERDA and 10 Quarter Horses without HERDA; the retrospective case series involved 28 horses with HERDA and 291 horses without HERDA. Ophthalmic examinations, Schirmer tear tests, tonometry, corneal pachymetry, histologic examinations, and scanning electron microscopy (SEM) were performed in cohorts of Quarter Horses with and without HERDA. Records were reviewed to determine the incidence of corneal ulcers in horses with and without HERDA during a 4-year period. Corneal thickness of horses with HERDA was significantly less than that of control horses, but tear production of horses with HERDA was significantly greater than that of control horses. Results of SEM revealed zones of disorganized, haphazardly arranged collagen fibrils in corneas of horses with HERDA that were not evident in corneas of control horses. The incidence of corneal ulcers was significantly greater for horses with HERDA than for horses without HERDA during the 4-year period. Alterations in corneal thickness, arrangement of collagen fibers, and incidence of corneal ulcers indicated that abnormalities in horses with HERDA were not limited to the skin.

  8. Cumulative impacts of hydroelectric development on the fresh water balance in Hudson Bay

    International Nuclear Information System (INIS)

    Anctil, F.; Couture, R.

    1994-01-01

    A study is presented of the impacts of hydroelectric development on the surface water layer of Hudson Bay, including James Bay and the Foxe Basin. These impacts are directly related to the modifications in the fresh water balance of Hudson Bay and originate from the management of hydroelectric complexes. The fresh water balance is determined by identifying, at different scales, the modifications caused by each complex. The main inputs are the freezing and thawing of the ice cover, runoff water, and mass exchange at the air-water interface. Three spatial scales were used to obtain the resolution required to document the cumulative effects of fresh water balance modifications on the water surface layer, one each for Hudson Bay, Hudson Strait, and the Labrador Sea. Finally, the addition of the proposed Great Whale hydroelectric complex is examined from the available information and forecasts. 18 refs,. 6 figs., 1 tab

  9. A modelling methodology for assessing the impact of climate variability and climatic change on hydroelectric generation

    International Nuclear Information System (INIS)

    Munoz, J.R.; Sailor, D.J.

    1998-01-01

    A new methodology relating basic climatic variables to hydroelectric generation was developed. The methodology can be implemented in large or small basins with any number of hydro plants. The method was applied to the Sacramento, Eel and Russian river basins in northern California where more than 100 hydroelectric plants are located. The final model predicts the availability of hydroelectric generation for the entire basin provided present and near past climate conditions, with about 90% accuracy. The results can be used for water management purposes or for analyzing the effect of climate variability on hydrogeneration availability in the basin. A wide range of results can be obtained depending on the climate change scenario used. (Author)

  10. The determinants of cost efficiency of hydroelectric generating plants: A random frontier approach

    International Nuclear Information System (INIS)

    Barros, Carlos P.; Peypoch, Nicolas

    2007-01-01

    This paper analyses the technical efficiency in the hydroelectric generating plants of a main Portuguese electricity enterprise EDP (Electricity of Portugal) between 1994 and 2004, investigating the role played by increase in competition and regulation. A random cost frontier method is adopted. A translog frontier model is used and the maximum likelihood estimation technique is employed to estimate the empirical model. We estimate the efficiency scores and decompose the exogenous variables into homogeneous and heterogeneous. It is concluded that production and capacity are heterogeneous, signifying that the hydroelectric generating plants are very distinct and therefore any energy policy should take into account this heterogeneity. It is also concluded that competition, rather than regulation, plays the key role in increasing hydroelectric plant efficiency

  11. Expanding the functional significance of automated control systems for the production process at hydroelectric plants

    International Nuclear Information System (INIS)

    Vasil'ev, Yu.S.; Kononova, M.Yu.

    1993-01-01

    Automated control systems for the production process (ACS PP) have been successfully implemented in a number of hydroelectric plants in the Russian Federation. The circle of problems that can be solved using ACS PP can be conditionally divided into two classes: on-line/technological control, and production-technological control. This article describes successes and future directions for the solution of these two classes of problems. From the discussion, it is concluded (1) that the data base for existing ACS PP at hydroelectric plants can be successfully employed as points for monitoring the conservation of an environment of local significance; (2) that is is expedient to discuss the problem with organizations, including local control groups interested in the development of territorial-basin systems for ecological monitoring; and (3) that the initiative in creating local territorial-basin support points for monitoring should emanate from guidelines for hydroelectric plants with ACS PP. 3 refs., 2 figs

  12. The green against hungry

    International Nuclear Information System (INIS)

    Slovak, K.

    2007-01-01

    In this paper author deals with the instruction of the European Commission about using of renewable energy (20 %) in European Union up to 2020 and share of biological components in fuels should be 5.75 % up to 2010. However, is it really advantageous to produce bio-fuels? So the scientists found, that e. g. by production of ethanol from corn in 29 per cent more energy is consumed as final product contains. It is similar also by production of bio-oil. Production of bio-oil from soya consumes in 27 per cent more energy from fossil fuels as it is possible to use from final biological product. In the present time the Swedish turnip is grown on the fivefold larger area as five years ago. More than tenth of silviculture soil in Germany is sowed by Swedish turnip. However, bio-oil produced from Swedish turnip grown on this area reaches only two-percent share on total consumption of oil. And just here also another problem is hidden, of which already several non-governmental organisations warn. Is concerned about cultivation of energetic plants at the expense of other plants, which can be used in food industry. In European Union there is not sufficiency of soil to cover the given shares of biological fuel on total consumption from own production. According to German protectionist organisation the Save wildwood the energetic plants can harm natural ecosystems. This organisation presents as example the soya plantages, because of which Amazon wildwood is cut down. Question of climatic changes, which the countries of north hemisphere decided to solve, can't be handled according them thereby, that new problems are formed in developing countries

  13. The performance study of a small hydroelectric power system

    International Nuclear Information System (INIS)

    Al-Jumaily, Khalil E. J.; Tawfi, Sinan Samir

    2006-01-01

    A small hydroelectric power system of an undershot waterwheel was designed, constructed and experimented in the hydraulic channel which has a sluice gate as a small dam. The constructed waterwheel diameter could be changed from 0.4 m to 0.6 m at interval steps of 0.04 m. The number of blades of the constructed waterwheel could be changed from 9 to 12 to 18 and to 36 blades. By increasing the water mass flow rate from 0.341 to 1.765 kg/s at channel cross sectional area (12.75 cm 2 ), the undershot waterwheel generated power which increased to 0.201 Watt, the mechanical efficiency increased to more than 10.8%, and the electrical efficiency increased to more than 80.6%. But the channel efficiency was decreased to 10.9%. while the volumetric efficiency was fixed at 72.9%. The waterwheel efficiency 17.25 m 2 at fixed water mass flow rate (1.765kg/s), the undershot waterwheel generated power system decreased in the following. The generator output power from 0.201 to 0.067 Watt, the mechanical efficiency reduced to 26.7% and the electrical efficiency reduced 94.4% and increased the channel efficiency from 8.6% to 100%, the volumetric efficiency from 70.9% to 75.5%, and the waterwheel efficiency from 85.7%( to 91.3%. The transitional efficiency was fixed at 97.9%. The maximum overall efficiency of the small generated power system was 6.69% at the water head 15.45 cm. The output power was 0.18 Watt. these values obtained when the number of blades 36, number of revolutions per minute 57 rpm, waterwheel diameter 0.44 m, water mass flow rate 1.765 kg/s, and channel cross sectional area 12.75 cm 2 . The theoretical extrapolation of the waterwheel diameter to 2 m with water head of 5 m gives an output generated power of 675 Watt.(Author)

  14. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  15. 77 FR 12280 - FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary...

    Science.gov (United States)

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 13824-000, 13826-000] FFP Missouri 17, LLC BOST2 Hydroelectric, LLC; Notice Announcing Filing Priority for Preliminary Permit... Hydroelectric, LLC, Project No. 13826-000. 2. FFP Missouri 17, LLC, Project No. 13824-000. Dated: February 22...

  16. 33 CFR Appendix - List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false List of FPC Standard Articles Forms Used in Permits and Licenses for Hydroelectric Projects Navigation and Navigable Waters CORPS OF... Forms Used in Permits and Licenses for Hydroelectric Projects The following FPC standard articles Forms...

  17. Least cost addition of power from hydroelectrical developments: Maximizing existing assets

    Energy Technology Data Exchange (ETDEWEB)

    Felix, Lafontant; Briand, Marie-Helene; Veilleux, Rheaume

    2010-09-15

    Hydroelectric developments built in the early 1900's are nearing their useful lifespan and require significant rehabilitation in order to meet modern safety and performance criteria. Also, global increasing energy costs represent a strong incentive for operators to find low-cost, environment-friendly solutions while increasing energy generation at existing facilities. Projects promoting innovative ways of recycling existing developments are great examples of sustainable development and represent win-win solutions for population and hydropower industry alike. The proposed presentation describes successful projects consisting in the rehabilitation or addition of power to existing hydroelectric. These recycling projects are very attractive from both economic and environmental.

  18. The business for power : hydro-electricity in southeastern British Columbia 1897-1997

    International Nuclear Information System (INIS)

    Mouat, J.

    1997-01-01

    The evolution and development of the hydroelectric power industry in southeastern British Columbia was chronicled by recounting the first hundred years of the West Kootenay Power and Light Electrical Utility. The utility's first generator produced electricity in the summer of 1898 when hydro-electric companies were a new phenomenon. The factors behind the success of the company, the personalities of the promoters and entrepreneurs that launched the company, the complex interplay of unique events and the social and political context that illustrate a fascinating process in which electricity became an integral part of everyday life, are described. Refs., tabs., figs

  19. Hydroelectric power: Energy vector for progress and development; Wasserkraft: Energievektor fuer Fortschritt und Entwicklung

    Energy Technology Data Exchange (ETDEWEB)

    Meclot, B; Dupuy, M; Weis, H; Linari, A; Baril, M; Barlow, M; Cambi, M; Cullen, R; Genier, M; Germeau, J P; Madureira, C; Mellquist, P; Perea, A; Rost, M; Savey, P; Schiller, G; Talhull, A

    1997-11-01

    Hydroelectric power in the UNIPEDE member states has a share of about 18 percent, i.e. slightly less than the world average of 19 percent. Hydroelectric power has good future prospects: It is a renewable energy source and well suited for storage. (orig) [Deutsch] Wasserkraft ist eine Energie, die im Rahmen der von den Mitgliedslaendern der UNIPEDE genutzten Energieerzeugungsarten eine hohe Bedeutung hat. Sie repraesentiert durchschnittlich 18% der erzeugten elektrischen Energie, leicht unterhalb des weltweiten Durchschnitts (19%). Die Merkmale der Wasserkraft verdienen Aufmerksamkeit: Es handelt sich um eine erneuerbare Energie, die in grossen Mengen gespeichert werden kann und in der Energiewirtschaft eine grosse Rolle spielt. (orig.)

  20. EDM - A model for optimising the short-term power operation of a complex hydroelectric network

    International Nuclear Information System (INIS)

    Tremblay, M.; Guillaud, C.

    1996-01-01

    In order to optimize the short-term power operation of a complex hydroelectric network, a new model called EDM was added to PROSPER, a water management analysis system developed by SNC-Lavalin. PROSPER is now divided into three parts: an optimization model (DDDP), a simulation model (ESOLIN), and an economic dispatch model (EDM) for the short-term operation. The operation of the KSEB hydroelectric system (located in southern India) with PROSPER was described. The long-term analysis with monthly time steps is assisted by the DDDP, and the daily analysis with hourly or half-hourly time steps is performed with the EDM model. 3 figs

  1. Impact of PETIT-SAUT hydroelectric dam on aquatic life (French Guyana)

    International Nuclear Information System (INIS)

    Sissakian, C.

    1992-01-01

    The construction of the hydroelectric scheme of PETIT-SAUT in French Guyana creates a reservoir which covers 310 km 2 of tropical rain forest. This hydroelectric scheme has an influence on the various aspects of the environment. One of the most important aspects is the modification of the water quality and of the aquatic life due to the degradation of organic matter. Some studies of the biology of these area fishes are initiated. At the same time, Electricite de France studies some constructive arrangements and reservoir managements to assure, the most rapidly possible, a return to an aquatic normal life. 6 refs

  2. Report on the development perspectives of the hydroelectric production in France

    International Nuclear Information System (INIS)

    2006-03-01

    This report, presented to the Ministry of the Economy, the Finances and the Industry, has been realized by the high ranking of the sustainable development of the Ministry. It presents the synthesis of the working group study at the second half year 2005 and proposes to the Ministry some practical actions to develop the hydroelectric production in France. After a presentation of the hydro electric-power challenges and potential, the author discusses the regulatory context of the hydroelectric power development, the conditions of this development and proposes some actions. (A.L.B.)

  3. Turning to account the implicit side effects of hydroelectric projects implying reservoirs

    International Nuclear Information System (INIS)

    Ionescu, S.

    1996-01-01

    Operation of the hydroelectric projects including relatively important water reservoirs provides implicitly side effects favorable to water management (increase of minimum provided flows, flood routing, etc) and to related fields (additional facilities for water supply, extension of the public utility networks as: road, telecommunication, electric lines, favoring the tourism and recreative activities). The paper suggests methodologies for economic and financial assessment of these effects, the turning to account of which, may increase the efficiency of the hydroelectric development and may stimulate the interest for new investments in the field.(author). 3 figs., 5 refs

  4. Evaluation of the Life Cycle Greenhouse Gas Emissions from Hydroelectricity Generation Systems

    Directory of Open Access Journals (Sweden)

    Akhil Kadiyala

    2016-06-01

    Full Text Available This study evaluated the life cycle greenhouse gas (GHG emissions from different hydroelectricity generation systems by first performing a comprehensive review of the hydroelectricity generation system life cycle assessment (LCA studies and then subsequent computation of statistical metrics to quantify the life cycle GHG emissions (expressed in grams of carbon dioxide equivalent per kilowatt hour, gCO2e/kWh. A categorization index (with unique category codes, formatted as “facility type-electric power generation capacity” was developed and used in this study to evaluate the life cycle GHG emissions from the reviewed hydroelectricity generation systems. The unique category codes were labeled by integrating the names of the two hydro power sub-classifications, i.e., the facility type (impoundment (I, diversion (D, pumped storage (PS, miscellaneous hydropower works (MHPW and the electric power generation capacity (micro (µ, small (S, large (L. The characterized hydroelectricity generation systems were statistically evaluated to determine the reduction in corresponding life cycle GHG emissions. A total of eight unique categorization codes (I-S, I-L, D-µ, D-S, D-L, PS-L, MHPW-µ, MHPW-S were designated to the 19 hydroelectricity generation LCA studies (representing 178 hydropower cases using the proposed categorization index. The mean life cycle GHG emissions resulting from the use of I-S (N = 24, I-L (N = 8, D-µ (N = 3, D-S (N = 133, D-L (N = 3, PS-L (N = 3, MHPW-µ (N = 3, and MHPW-S (N = 1 hydroelectricity generation systems are 21.05 gCO2e/kWh, 40.63 gCO2e/kWh, 47.82 gCO2e/kWh, 27.18 gCO2e/kWh, 3.45 gCO2e/kWh, 256.63 gCO2e/kWh, 19.73 gCO2e/kWh, and 2.78 gCO2e/kWh, respectively. D-L hydroelectricity generation systems produced the minimum life cycle GHGs (considering the hydroelectricity generation system categories with a representation of at least two cases.

  5. The Management of Horses during Fireworks in New Zealand

    Science.gov (United States)

    Gronqvist, Gabriella; Rogers, Chris; Gee, Erica

    2016-01-01

    Simple Summary The negative effects of fireworks on companion animals have been reported, but little has been documented on the impact on horses. Horse anxiety was commonly associated with fireworks, and 26% of owners reported horse injuries as a result of fireworks. Many management strategies were seen as ineffective. The majority of horse owners were in favour of a ban on the sale of fireworks for private use. Abstract Within popular press there has been much coverage of the negative effects associated with firework and horses. The effect of fireworks has been documented in companion animals, yet no studies have investigated the negative effects, or otherwise, of fireworks on horses. This study aims to document horse responses and current management strategies to fireworks via an online survey. Of the total number of horses, 39% (1987/4765) were rated as “anxious”, 40% (1816/4765) “very anxious” and only 21% (965/4765) rated as “not anxious” around fireworks. Running (82%, 912/1107) was the most common behaviour reported, with no difference between property type (p > 0.05) or location (p > 0.05). Possibly as a consequence of the high frequency of running, 35% (384/1107) of respondents reported having horses break through fences in response to fireworks and a quarter (26%, 289/1099) reported that their horse(s) had received injuries associated with fireworks. The most common management strategy was moving their horse(s) to a paddock away from the fireworks (77%) and to stable/yard them (55%). However, approximately 30% reported these management strategies to be ineffective. Of the survey participants, 90% (996/1104) were against the sale of fireworks for private use. PMID:27005667

  6. Phagocytosis, bacterial killing, and cytokine activation of circulating blood neutrophils in horses with severe equine asthma and control horses.

    Science.gov (United States)

    Vanderstock, Johanne M; Lecours, Marie-Pier; Lavoie-Lamoureux, Annouck; Gottschalk, Marcelo; Segura, Mariela; Lavoie, Jean-Pierre; Jean, Daniel

    2018-04-01

    OBJECTIVE To evaluate in vitro phagocytosis and bactericidal activity of circulating blood neutrophils in horses with severe equine asthma and control horses and to determine whether circulating blood neutrophils in horses with severe equine asthma have an increase in expression of the proinflammatory cytokine tumor necrosis factor (TNF)-α and the chemokine interleukin (IL)-8 and a decrease in expression of the anti-inflammatory cytokine IL-10 in response to bacteria. ANIMALS 6 horses with severe equine asthma and 6 control horses. PROCEDURES Circulating blood neutrophils were isolated from horses with severe equine asthma and control horses. Phagocytosis was evaluated by use of flow cytometry. Bactericidal activity of circulating blood neutrophils was assessed by use of Streptococcus equi and Streptococcus zooepidemicus as targets, whereas the cytokine mRNA response was assessed by use of a quantitative PCR assay. RESULTS Circulating blood neutrophils from horses with severe equine asthma had significantly lower bactericidal activity toward S zooepidemicus but not toward S equi, compared with results for control horses. Phagocytosis and mRNA expression of TNF-α, IL-8, and IL-10 were not different between groups. CONCLUSIONS AND CLINCAL RELEVANCE Impairment of bactericidal activity of circulating blood neutrophils in horses with severe equine asthma could contribute to an increased susceptibility to infections.

  7. DMPD: Lipoprotein trafficking in vascular cells. Molecular Trojan horses and cellularsaboteurs. [Dynamic Macrophage Pathway CSML Database

    Lifescience Database Archive (English)

    Full Text Available 9287290 Lipoprotein trafficking in vascular cells. Molecular Trojan horses and cell...ml) Show Lipoprotein trafficking in vascular cells. Molecular Trojan horses and cellularsaboteurs. PubmedID ...9287290 Title Lipoprotein trafficking in vascular cells. Molecular Trojan horses

  8. Surgical management of proximal splint bone fractures in the horse

    International Nuclear Information System (INIS)

    Peterson, P.R.; Pascoe, J.R.; Wheat, J.D.

    1987-01-01

    Fractures of Metacarpal and Metatarsal II and IV (the splint bones) were treated in 283 horses over an 11 year period. In 21 cases the proximal portion of the fractured bone was stabilized with metallic implants. One or more cortical bone screws were used in 11 horses, and bone plates were applied in 11 horses. One horse received both treatments. Complications of screw fixation included bone failure, implant failure, radiographic lucency around the screws, and proliferative new bone at the ostectomy site. Only two of the horses treated with screw fixation returned to their intended use. Complications of plate fixation included partial fixation failure (backing out of screws), wound drainage, and proliferative bony response around the plate. Six of the 11 horses treated by plate fixation returned to their intended use. The authors recommend consideration of plate fixation techniques for repair of fractures in the proximal third of the splint bone

  9. Idiopathic gastroesophageal reflux disease in an adult horse.

    Science.gov (United States)

    Baker, Shannon J; Johnson, Philip J; David, Andrew; Cook, Cristi Reeves

    2004-06-15

    Chronic gastroesophageal reflux disease was diagnosed in a 22-year-old female Tennessee Walking Horse that had signs of bruxism and ptyalism. Esophageal ulceration was detected via endoscopy. Compared with the damage to the proximal portions of the esophagus, the severity of the ulceration increased toward the gastroesophageal junction. Esophageal ulceration attributable to chronic gastric acid reflux is usually secondary to pyloric outflow obstruction in horses. In the horse of this report, there was no evidence of either a chronic pyloric or duodenal obstruction that could have resulted in esophageal ulceration. Esophageal ulceration in this horse was attributed to gastroesophageal reflux disease, a common condition in humans in which the underlying abnormality is functional incompetence of the gastroesophageal junction. Treatment is directed at decreasing gastric acidity and protecting the ulcerated mucosa. In the horse of this report, treatment was unsuccessful and the horse was euthanatized; a physical cause of gastroesophageal reflux disease was not identified during an extensive postmortem examination.

  10. The Evolutionary Origin and Genetic Makeup of Domestic Horses.

    Science.gov (United States)

    Librado, Pablo; Fages, Antoine; Gaunitz, Charleen; Leonardi, Michela; Wagner, Stefanie; Khan, Naveed; Hanghøj, Kristian; Alquraishi, Saleh A; Alfarhan, Ahmed H; Al-Rasheid, Khaled A; Der Sarkissian, Clio; Schubert, Mikkel; Orlando, Ludovic

    2016-10-01

    The horse was domesticated only 5.5 KYA, thousands of years after dogs, cattle, pigs, sheep, and goats. The horse nonetheless represents the domestic animal that most impacted human history; providing us with rapid transportation, which has considerably changed the speed and magnitude of the circulation of goods and people, as well as their cultures and diseases. By revolutionizing warfare and agriculture, horses also deeply influenced the politico-economic trajectory of human societies. Reciprocally, human activities have circled back on the recent evolution of the horse, by creating hundreds of domestic breeds through selective programs, while leading all wild populations to near extinction. Despite being tightly associated with humans, several aspects in the evolution of the domestic horse remain controversial. Here, we review recent advances in comparative genomics and paleogenomics that helped advance our understanding of the genetic foundation of domestic horses. Copyright © 2016 by the Genetics Society of America.

  11. Characterisation of the horse transcriptome from immunologically active tissues

    Directory of Open Access Journals (Sweden)

    Joanna Moreton

    2014-05-01

    Full Text Available The immune system of the horse has not been well studied, despite the fact that the horse displays several features such as sensitivity to bacterial lipopolysaccharide that make them in many ways a more suitable model of some human disorders than the current rodent models. The difficulty of working with large animal models has however limited characterisation of gene expression in the horse immune system with current annotations for the equine genome restricted to predictions from other mammals and the few described horse proteins. This paper outlines sequencing of 184 million transcriptome short reads from immunologically active tissues of three horses including the genome reference “Twilight”. In a comparison with the Ensembl horse genome annotation, we found 8,763 potentially novel isoforms.

  12. Investigation of inflammatory markers in horses with acute abdominal pain

    DEFF Research Database (Denmark)

    Pihl, Tina Holberg; Kjelgaard-Hansen, Mads; Andersen, Pia Haubro

    of colic horses in a referral hospital have not been reported earlier. Objectives Evaluation of serum and peritoneal fluid (PF) levels of serum amyloid A (SAA) and haptoglobin in horses with colic. Methods Blood and PF samples were collected from 75 colic horses at admission to a referral hospital and from...... 19 healthy control horses. SAA and haptoglobin were measured in both serum and PF. Colic cases were classified according to diagnosis, treatment and outcome based on the clinical records. Protein concentrations were compared between groups with student´s t-test and ANOVA. Results Colic horses had...... significantly higher mean concentrations of serum SAA, PF SAA and PF haptoglobin compared to controls. PF SAA was significantly higher in horses with infectious conditions compared to both simple and strangulating obstructions, where as PF haptoglobin was higher in both strangulating and infectious conditions...

  13. Object recognition and generalisation during habituation in horses

    DEFF Research Database (Denmark)

    Christensen, Janne Winther; Zharkikh, Tjatjana; Chovaux, Elodie

    2011-01-01

    The ability of horses to habituate to frightening stimuli greatly increases safety in the horse–human relationship. A recent experiment suggested, however, that habituation to frightening visual stimuli is relatively stimulus-specific in horses and that shape and colour are important factors...... for object generalisation (Christensen et al., 2008). In a series of experiments, we aimed to further explore the ability of horses (n = 30, 1 and 2-year-old mares) to recognise and generalise between objects during habituation. TEST horses (n = 15) were habituated to a complex object, composed of five...... simple objects of varying shape and colour, whereas CONTROL horses (n = 15) were habituated to the test arena, but not to the complex object. In the first experiment, we investigated whether TEST horses subsequently reacted less to i) simple objects that were previously part of the complex object (i...

  14. Analysis of horse genomes provides insight into the diversification and adaptive evolution of karyotype

    OpenAIRE

    Huang, J. L.; Zhao, Y. P.; Shiraigol, W.; Li, B.; Bai, D. Y.; Ye, W. X.; Daidiikhuu, D.; Yang, L. H.; Jin, Brqqg; Zhao, Q. A.; Gao, Y. H.; Wu, J.; Bao, Wydl; Li, A. A.; Zhang, Y. H. Percival

    2014-01-01

    Karyotypic diversification is more prominent in Equus species than in other mammals. Here, using next generation sequencing technology, we generated and de novo assembled quality genomes sequences for a male wild horse (Przewalski's horse) and a male domestic horse (Mongolian horse), with about 93-fold and 91-fold coverage, respectively. Portion of Y chromosome from wild horse assemblies (3 M bp) and Mongolian horse (2 M bp) were also sequenced and de novo assembled. We confirmed a Robertsoni...

  15. Analysis of horse genomes provides insight into the diversification and adaptive evolution of karyotype

    OpenAIRE

    Huang, Jinlong; Zhao, Yiping; Shiraigol, Wunierfu; Li, Bei; Bai, Dongyi; Ye, Weixing; Daidiikhuu, Dorjsuren; Yang, Lihua; Jin, Burenqiqige; Zhao, Qinan; Gao, Yahan; Wu, Jing; Bao, Wuyundalai; Li, Anaer; Zhang, Yuhong

    2014-01-01

    Karyotypic diversification is more prominent in Equus species than in other mammals. Here, using next generation sequencing technology, we generated and de novo assembled quality genomes sequences for a male wild horse (Przewalski's horse) and a male domestic horse (Mongolian horse), with about 93-fold and 91-fold coverage, respectively. Portion of Y chromosome from wild horse assemblies (3 M bp) and Mongolian horse (2 M bp) were also sequenced and de novo assembled. We confirmed a Robertsoni...

  16. A Massively Parallel Sequencing Approach Uncovers Ancient Origins and High Genetic Variability of Endangered Przewalski's Horses

    OpenAIRE

    Goto, Hiroki; Ryder, Oliver A.; Fisher, Allison R.; Schultz, Bryant; Kosakovsky Pond, Sergei L.; Nekrutenko, Anton; Makova, Kateryna D.

    2011-01-01

    The endangered Przewalski's horse is the closest relative of the domestic horse and is the only true wild horse species surviving today. The question of whether Przewalski's horse is the direct progenitor of domestic horse has been hotly debated. Studies of DNA diversity within Przewalski's horses have been sparse but are urgently needed to ensure their successful reintroduction to the wild. In an attempt to resolve the controversy surrounding the phylogenetic position and genetic diversity o...

  17. Chronic pulmonary disease - a multifacted disease complex in the horse

    International Nuclear Information System (INIS)

    Clarke, A.F.

    1987-01-01

    This paper reviews chronic pulmonary disease (CPD) as an insidiously developing disease capable of being manifest in many degrees. Horses may suffer mild, sub-clinical degrees of lower respiratory tract inflammation or small airway disease withouth showing symptoms at rest. This form of disease becomes manifest as poor performance when these horses take part in athletic competition. Factors relating to the aetiology, diagnosis, treatment and prevention of all degrees of small airway disease of horses are discussed. 30 refs

  18. Experimental inoculation of equine coronavirus into Japanese draft horses.

    Science.gov (United States)

    Nemoto, Manabu; Oue, Yasuhiro; Morita, Yoshinori; Kanno, Toru; Kinoshita, Yuta; Niwa, Hidekazu; Ueno, Takanori; Katayama, Yoshinari; Bannai, Hiroshi; Tsujimura, Koji; Yamanaka, Takashi; Kondo, Takashi

    2014-12-01

    Recently, outbreaks associated with equine coronavirus (ECoV) have occurred in Japan and the United States. While ECoV is likely to be pathogenic to horses, it has not been shown that experimental inoculation of horses with ECoV produces clinical signs of disease. In this study, we inoculated three Japanese draft horses with an ECoV-positive diarrheic fecal sample to confirm infection after inoculation and to investigate the clinical course and virus shedding patterns of ECoV. Virus neutralization tests showed that all three horses became infected with ECoV. Two of the three horses developed clinical signs similar to those observed during ECoV outbreaks, including fever, anorexia, and gastrointestinal dysfunction. All horses excreted a large amount of virus into their feces for more than 9 days after inoculation regardless of the presence or absence of clinical signs, which suggests that feces are an important source of ECoV infection. ECoV was also detected in nasal swabs from all horses, suggesting that respiratory transmission of ECoV may occur. Both symptomatic horses developed viremia, while the asymptomatic horse did not. White blood cell counts and serum amyloid A concentrations changed relative to the clinical condition of the inoculated horses; these may be useful markers for monitoring the clinical status of horses infected with ECoV. This is the first report of induction of clinical signs of ECoV infection in horses by experimental inoculation. These clinical and virological findings should aid further investigation of the pathogenesis of ECoV.

  19. 15 CFR 754.5 - Horses for export by sea.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Horses for export by sea. 754.5... CONTROLS § 754.5 Horses for export by sea. (a) License requirement. As indicated by the letters “SS” in the... No. 1 to part 774 of the EAR) a license is required for the export of horses exported by sea to all...

  20. Plasma serotonin in horses undergoing surgery for small intestinal colic

    OpenAIRE

    Torfs, Sara C; Maes, An A; Delesalle, Catherine J; Pardon, Bart; Croubels, Siska M; Deprez, Piet

    2015-01-01

    This study compared serotonin concentrations in platelet poor plasma (PPP) from healthy horses and horses with surgical small intestinal (SI) colic, and evaluated their association with postoperative ileus, strangulation and non-survival. Plasma samples (with EDTA) from 33 horses with surgical SI colic were collected at several pre- and post-operative time points. Serotonin concentrations were determined using liquid-chromatography tandem mass spectrometry. Results were compared with those fo...

  1. 76 FR 18747 - Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric...

    Science.gov (United States)

    2011-04-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 4784-081] Teton Power Funding, LLC; Topsham Hydro Partners Limited Partnership; Topsham Hydroelectric Generating Facility Trust No. 1; Brown Bear Power, LLC; Notice of Application for Partial Transfer of License, and Soliciting...

  2. Analysis of synchronous and induction generators used at hydroelectric power plant

    Science.gov (United States)

    Diniş, C. M.; Popa, G. N.; lagăr, A.

    2017-01-01

    In this paper is presented an analysis of the operating electric generators (synchronous and induction) within a small capacity hydroelectric power plant. Such is treated the problem of monitoring and control hydropower plant using SCADA systems. Have been carried an experimental measurements in small hydropower plant for different levels of water in the lake and various settings of the operating parameters.

  3. 76 FR 12101 - Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment

    Science.gov (United States)

    2011-03-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Project No. 12737-002] Jordan Hydroelectric Limited Partnership; Notice of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR part 380 (Order No. 486, 52 FR 447897), the Office of...

  4. Presentation plan of the reconstruction and upgrade hydroelectric power plant 'Zvornik'

    Directory of Open Access Journals (Sweden)

    Krstić Dušan B.

    2016-01-01

    Full Text Available By the basic project of the energy utilization of the middle part of the river Drina (from Višegrad to Zvornik building of five large hydroelectric power plants was planned. Hydroelectric power plant near Zvornik had the greatest advantage, and it is the first built. Hydroelectric power plant 'Zvornik' separates the river Drina, about 1 km upstream from Mali Zvornik in Serbia and Zvornik in Bosnia and Herzegovina. In order to extend the work life, by the urban development project was planned modernization of production aggregates and associated equipment, the upgrade of annexes above the aggregate siphons A1 and A2, as well as the upgrade of the annexes of the powerhouse on the right bank of the river in the function of accommodation of electrical equipment. By replacing of the vital parts of turbines with increasing diameter with an increase of efficiency, Bow and power, as well as replacing generators with new generator of higher power with excitation and all the necessary auxiliary equipment, will ensure reliable operation of the hydroelectric power plant and will extend the working life of the next 40 years, creating opportunities for retrofitting additional fifth unit.

  5. 76 FR 15971 - Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-03-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002-CA] Eagle Mountain Pumped Storage Hydroelectric Project; Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, April 15, 2011 at 9 a.m. (Pacific Time). b. Place: By copy of this notice we are inviting all...

  6. 76 FR 22699 - Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference

    Science.gov (United States)

    2011-04-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-13123-002--CA] Eagle Mountain Pumped Storage Hydroelectric Project, Eagle Crest Energy; Notice of Teleconference a. Date and Time of Meeting: Friday, May 6, 2011 at 1 p.m. (Pacific Time). b. Place: By copy of this notice we are inviting all...

  7. Constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    The objective of the present work is to study the constraints of Micro Hydroelectric Power Plants (MHPPs) installed in the West Region of Cameroon. The study was carried out between January 2005 and December 2008 and is related to water conveyance structures, production facilities; transportation and distribution ...

  8. To Construction of Expendable Hydroelectric Power Station Characteristics and Their Timely Correction

    Directory of Open Access Journals (Sweden)

    V. Kh. Nasibov

    2006-01-01

    Full Text Available The paper provides a technique of analytical construction of expendable characteristics and characteristics of a relative gain of water charge at a hydroelectric power station. Planning method and regression analysis have been applied for the construction of these characteristics.

  9. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Science.gov (United States)

    2013-08-09

    ... DEPARTMENT OF ENERGY [OE Docket No. PP-387] Application for Presidential Permit; Soule River Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery...

  10. 77 FR 47058 - Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft...

    Science.gov (United States)

    2012-08-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [P-2079-069--CA] Middle Fork American River Hydroelectric Project Placer County Water Agency; Notice of Draft Environmental Impact Statement; Public Meetings a. Date and Time of Meetings: Tuesday, August 28, 2012, from 9:00 a.m. to 11:00 a.m. and...

  11. 76 FR 45249 - Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting

    Science.gov (United States)

    2011-07-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12715-003] Fairlawn Hydroelectric Company, LLC; Notice of Public Meeting On August 5, 2011, Office of Energy Projects staff may participate in a public meeting hosted by the U.S. Army Corps of Engineers, Baltimore District (Corps) for the...

  12. Hydroelectric power plant Irape - viability studies; Usina hidroeletrica Irape - estudos de viabilidade

    Energy Technology Data Exchange (ETDEWEB)

    Serran, F.P.; Assumpcao, M.G.

    1994-06-01

    The socio-environmental analysis of the feasibility studies from Irape Hydroelectric Power Plant in Minas Gerais State-Brazil was described including three main questions: the regional insertion mentioning the social conflicts, the social communication program and the basic strategic; the reduction of water volume downstream; the development of programs on the Basic Project Stage.

  13. Wind as a feasible alternative source for improving the deficiency of hydroelectricity in Tanzania

    International Nuclear Information System (INIS)

    Kainkwa, R. M.

    2006-01-01

    Hydroelectricity is the main source of electricity in Tanzania since about 86% of the electricity generated is from this source. During the dry season there is normally a storage of water in the dams and as such the electricity generated is below the demand. In 2004 a natural gas power plant was inaugurated to alleviate this shortage of electricity. When generating electricity from natural gas, exotic gases are emitted which pollute our environment. This source of energy also cannot regenerate itself within the human life scale. Wind is a renewable source that can be used to supplement the shortage of hydroelectricity in Tanzania. Wind speed data collected from a location with high wind energy potential shows that electricity can be generated from the wind to alleviate this shortage of hydroelectricity. Wind and rainfall data demonstrate further that the windy season, which is from July to November coincide with the dry season in which the use of wind energy in electric generation can help to fill the gap of the hydroelectricity that prevails during that season. The use of wind instead of natural gas will reduce the environmental pollution that results from extracting energy from the fossil fuel source.(Author)

  14. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  15. 77 FR 9231 - FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing

    Science.gov (United States)

    2012-02-16

    .... 13826-000] FFP Missouri 17, LLC; BOST2 Hydroelectric, LLC; Notice Announcing Preliminary Permit Drawing... of the Commission, or her designee, will conduct a random drawing to determine the filing priority of... applications as provided in section 4.37 of its regulations.\\2\\ The priority established by this drawing will...

  16. constraints of micro hydroelectric power plants in the west region of ...

    African Journals Online (AJOL)

    DJFLEX

    KEYWORDS: Constraints; craftsmen; funds; highlands; hydroelectric. INTRODUCTION ... MATERIAL AND METHODS. 1.1 Physical ... (Bamougoum; Bapi; Batotcha) are due to the use ... water very often escapes from the air vent because of its .... The funds raised will remedy ... Graw-Hill Book Company New York,. USA.

  17. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Science.gov (United States)

    2010-06-02

    ... associated with the Dallas Creek Project; and the anticipated return on investment. If there are additional... entity to develop hydroelectric power at Ridgway Dam, and power purchasing and/or marketing... and interested entities to discuss Western's potential marketing of hydropower. FOR FURTHER...

  18. Determining generator parameters of Camargos hydroelectric power plant through frequency response measurement

    Energy Technology Data Exchange (ETDEWEB)

    Oliveira, Sebastiao E.M. de; Padua Guarini, Antonio de [Centro de Pesquisas de Energia Eletrica (CEPEL), Rio de Janeiro, RJ (Brazil); Souza, Joao A. de; Valgas, Helio M; Pinto, Roberto del Giudice R. [Companhia Energetica de Minas Gerais (CEMIG), Belo Horizonte, MG (Brazil)

    1994-12-31

    This work describes the results of the set frequency response tests performed in the generator number 2, 6.9 kV, 25 MVA, of Camargos hydroelectric power plant, CEMIG, and the parameters relatives to determined structures of model. This tests are unpublished in Brazil. (author) 7 refs., 16 figs., 7 tabs.

  19. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  20. 76 FR 51027 - F&B Wood Corporation; Milltown Hydroelectric LLC.; Notice of Transfer of Exemption

    Science.gov (United States)

    2011-08-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12629-003] F&B Wood... the Commission's regulations,\\1\\ F&B Wood Corporation, exemptee for the Corriveau Hydroelectric... Project No. 12629 on October 24, 2006. F&B Wood Corp.,117 FERC ] 62,059 (2006) \\3\\ See filings of May 9...

  1. An Investigation of Health and Safety Measures in a Hydroelectric Power Plant

    Directory of Open Access Journals (Sweden)

    Amevi Acakpovi

    2016-12-01

    Conclusion: The implementation of the proposed recommendations in this paper, would lead to the prevention of work-related injuries and illnesses of employees as well as property damage and incidents in hydroelectric power plants. The recommendations may equally be considered as benchmark for the Safety and Health Management System with international standards.

  2. Status Review of Wildlife Mitigation, Columbia Basin Hydroelectric Projects, Columbia River Mainstem Facilities, 1984 Final Report.

    Energy Technology Data Exchange (ETDEWEB)

    Howerton, Jack; Hwang, Diana

    1984-11-01

    This report reviews the status of past, present, and proposed future wildlife planning and mitigation programs at existing hydroelectric projects in the Columbia River Basin. The project evaluations will form the basis for determining any needed remedial measures or additional project analysis. Each hydropower facility report is abstracted separately for inclusion in the Energy Data Base.

  3. Common variable immunodeficiency in a horse.

    Science.gov (United States)

    Flaminio, M Julia B F; LaCombe, Veronique; Kohn, Catherine W; Antczak, Douglas F

    2002-11-01

    A 12-year-old Quarter Horse mare that was nonresponsive to medical treatment was evaluated for chronic respiratory disease and hepatobiliary disease. Serum immunoglobulin concentrations were measured by use of radial immunodiffusion that revealed trace to nondetectable concentrations of IgG, IgG(T), IgM, and IgA. Use of serum protein electrophoresis confirmed agammaglobulinemia by the absence of the expected peak in the gamma region. In addition, vaccination with tetanus toxoid did not result in specific immunoglobulin production. Flow cytometric analysis of blood lymphocyte subpopulations revealed the absence of B cells in blood. Immunohistochemical analysis of tissue sections revealed the absence of B lymphocytes in bone marrow and spleen, with occasional B cells in the peripheral lymph nodes. Blood lymphocyte proliferation assays revealed weak responses to pokeweed mitogen and no response to stimulation with lipopolysaccharide. Considering the age and sex of the horse, results of the immunologic tests suggested a diagnosis of common variable immunodeficiency.

  4. An ethological study of young horses

    Directory of Open Access Journals (Sweden)

    Pavla Šišková

    2006-01-01

    Full Text Available In the present study called “An Ethological Study of Young Horses” we focused on the behaviour of foals from their birth to separation from their mother. We observed and analysed their behaviour and daily activities, and from the achieved results we drew conclusions for practical horse breeding. We studied the following forms of behaviour of the foals: feeding behaviour (sucking, drinking, eating roughage and concentrates, gleaning, coprophagia, defecation and micturition, comfortable behaviour and mutual comfort behaviour, manifestations of relaxation (resting posture, lying down, movement manifestations, playful behaviour, stereotype behaviour, other manifestations (acoustic, olfactory etc.As a result we recommended several changes in the technology, e.g. larger stables, salt-lick out of reach of the foals, more frequent exchange of bedding, shelter for horses grazing in the open.

  5. The Trojan horse method in nuclear astrophysics

    International Nuclear Information System (INIS)

    Aliotta, M.; Rolfs, C.; Lattuada, M.; Pellegriti, M.G.; Pizzone, R.G.; Spitaleri, C.; Miljanic, Dj.; Typel, S.; Wolter, H.H.

    2001-01-01

    Because of the Coulomb barrier, reaction cross sections in astrophysics cannot be accessed directly at the relevant Gamow energies, unless very favourable conditions are met (e.g. LUNA--underground experiments). Theoretical extrapolations of available data are then needed to derive the astrophysical S(0)-factor. Various indirect processes have been used in order to obtain additional information on the parameters entering these extrapolations. The Trojan Horse Method is an indirect method which might help to bypass some of the problems typically encountered in direct measurements, namely the presence of the Coulomb barrier and the effect of the electron screening. However, a comparison with direct data in an appropriate energy region (e.g. around the Coulomb barrier) is crucial before extending the method to the relevant Gamow energy. Additionally, experimental and theoretical tests are needed to validate the assumptions underlying the method. The application of the Trojan Horse Method to some cases of interest is discussed

  6. Retrospective analysis of factors associated with outcome of proximal interphalangeal joint arthrodesis in 82 horses including Warmblood and Thoroughbred sport horses and Quarter Horses (1992-2014).

    Science.gov (United States)

    Herthel, T D; Rick, M C; Judy, C E; Cohen, N D; Herthel, D J

    2016-09-01

    Outcomes associated with arthrodesis of the proximal interphalangeal (PIP) joint in Quarter Horses used for Western performance activities are well documented but little is known regarding outcomes for other types of horses. To identify factors associated with outcomes, including breed and activity, after arthrodesis of the PIP joint in Warmbloods, Thoroughbreds and Quarter Horses. Retrospective case series. Surgical case records of 82 Quarter Horses principally engaged in Western performance and Thoroughbred or Warmblood breeds principally engaged in showing, showjumping and dressage, with arthrodesis of the PIP joint were reviewed. Arthrodesis was performed with either 3 transarticular cortex bone screws placed in lag fashion, a dynamic compression plate (DCP) with 2 transarticular cortex bone screws placed in lag fashion, or a locking compression plate (LCP) with 2 transarticular cortex bone screws placed in lag fashion. Demographic data, clinical presentation, radiographic findings, surgical technique, post operative treatment and complications were recorded. Long-term follow-up was obtained for all 82 horses. Osteoarthritis of the PIP joint was the most common presenting condition requiring arthrodesis, which was performed with either the 3 screw technique (n = 41), DCP fixation (n = 22), or LCP fixation (n = 19). Post operatively, 23/31 (74%) Warmbloods/Thoroughbreds and 44/51 (87%) Quarter Horses achieved successful outcomes. Thirteen of 23 (57%) Warmbloods/Thoroughbreds and 24 of 38 (63%) Quarter Horses, used for athletic performance, returned to successful competition. Within this subgroup of horses engaged in high-level activity, regardless of breed type, horses undergoing hindlimb arthrodesis were significantly more likely to return to successful competition (73%; 33/45) than those with forelimb arthrodesis (25%; 4/16, P = 0.002). Arthrodesis of the PIP joint in Warmbloods/Thoroughbreds and Quarter Horses results in a favourable outcome for return to

  7. Endoscopic-assisted electrohydraulic shockwave lithotripsy in standing sedated horses.

    Science.gov (United States)

    Röcken, Michael; Fürst, Anton; Kummer, Martin; Mosel, Gesine; Tschanz, Theo; Lischer, Christoph J

    2012-07-01

    To report use of transendoscopic electrohydraulic shockwave lithotripsy for fragmentation of urinary calculi in horses. Case series. Male horses (n = 21). Fragmentation of cystic calculi (median, 6 cm diameter; range, 4-11 cm diameter) was achieved by transurethral endoscopy in standing sedated horses using an electrohydraulic shockwave fiber introduced through the biopsy channel of an endoscope. The fiber was advanced until it contacted the calculus. Repeated activation of the fiber was used to disrupt the calculus into fragments calculus removal was achieved in 20 horses (95%) with mean total surgical time of 168.6 minutes (range, 45-450). In the 20 horses with single calculi, 1-6 sessions were required to completely fragment the calculus. Except for 1 horse, in which perineal urethrotomy was eventually performed for complete fragment removal, fragments calculi were excreted via the urethra. Postoperative complications included hematuria because of severe mucosal erosion (n = 2), dysuria because of a trapped urethral fragment (2), small amount of urinary debris (1). One horse was euthanatized because of bladder rupture. Complete clearance of calculi and urinary debris was confirmed endoscopically 20 (3-45) days after the last session. Telephone follow-up (mean, 18.8 months; range, 7-24 months) revealed that horses had returned to previous activity levels without recurrence of clinical signs. Transendoscopic electrohydraulic lithotripsy appears to be an effective method for fragmentation of low-density calcium carbonate cystic calculi in male horses. Copyright 2012 by The American College of Veterinary Surgeons.

  8. Evaluation of the conformation of stallions of selected horse breeds

    Directory of Open Access Journals (Sweden)

    Tereza Petlachová

    2012-01-01

    Full Text Available The aim of this study was to evaluate the conformation of stallions of the breeds American Quarter Horse (AQH, American Paint Horse (APH, Appaloosa (Appa, the Lipizzaner horse (LH and the Old Kladruby horse (OKH. Representatives of these breeds are characterized as the descendants of horses on the base of the Arab-Berber blood. Western breeds (AQH, APH, Appa due to different environmental conditions, nutrition and the other structure under the influence of a different type of use, type of riding demands differed considerably from the original Spanish-type horses. It was measured a total of 24 body dimensions. Representatives of The American western breeds are statistically highly conclusively (P ≤ 0.01 in 23 of the 24 observed effects. To be precise, they are: smaller wither height as measured by stick, lower at the tail-set, longer neck, narrower chest, longer oblique body length, wider front pelvis length, longer pelvis bones, longer femur bones, shorter hind cannons.A statistically significant difference (P ≤ 0.05 was found in the length of the humerus, where the Old Kladruby Horse has a humerus that is longer by 2.34 cm than that of the APH. The Lipizzaner horse differs statistically highly conclusively (P ≤ 0.01 from the Appaloosa and Old Kladruby horse in the tape length of its head.

  9. Bone scintigraphy for horses; Die Skelettszintigrafie beim Pferd

    Energy Technology Data Exchange (ETDEWEB)

    Jahn, Werner [Pferdeklinik Bargteheide (Germany)

    2010-03-15

    Scintigraphy (bone scan) is being used approximately since 1980 in the horse under general anaesthesia. With the construction of custom-made overhead gantries for gamma-cameras scintigraphy found widespread entry in big equine referral hospitals for bone-scanning of the standing horse. Indications for the use of a bone scan in the horse are inflammatory alterations in the locomotor apparatus. It is primarily used for diagnosis of lameness of unknown origin, suspect of stress fracture or hairline fracture and for horses with bad riding comfort with suspected painful lesions in the spine. (orig.)

  10. Genetic diversity of Halla horses using microsatellite markers

    Directory of Open Access Journals (Sweden)

    Joo-Hee Seo

    2016-11-01

    Full Text Available Abstract Background Currently about 26,000 horses are breeding in Korea and 57.2% (14,776 horses of them are breeding in Jeju island. According to the statistics published in 2010, the horses breeding in Jeju island are subdivided into Jeju horse (6.1%, Thoroughbred (18.8% and Halla horse (75.1%. Halla horses are defined as a crossbreed between Jeju and Thoroughbred horses and are used for horse racing, horse riding and horse meat production. However, little research has been conducted on Halla horses because of the perception of crossbreed and people’s weighted interest toward Jeju horses. Method Using 17 Microsatellite (MS Markers recommended by International Society for Animal Genetics (ISAG, genomic DNAs were extracted from the hair roots of 3,880 Halla horses breeding in Korea and genetic diversity was identified by genotyping after PCR was performed. Results and conclusion In average, 10.41 alleles (from 6 alleles in HTG7 to 17 alleles in ASB17 were identified after the analysis using 17 MS Markers. The mean value of Hobs was 0.749 with a range from 0.612(HMS1 to 0.857(ASB2. Also, it was found that Hexp and PIC values were lowest in HMS1 (0.607 and 0.548, respectively, and highest in LEX3(0.859 and 0.843, respectively, and the mean value of Hexp was 0.760 and that of PIC was 0.728. 17 MS markers used in this studies were considered as appropriate markers for the polymorphism analysis of Halla horses. The frequency for the appearance of identical individuals was 5.90 × 10−20 when assumed as random mating population and when assumed as half-sib and full-sib population, frequencies were 4.08 × 10−15 and 3.56 × 10−8, respectively. Based on these results, the 17 MS markers can be used adequately for the Individual Identification and Parentage Verification of Halla horses. Remarkably, allele M and Q of ASB23 marker, G of HMS2 marker, H and L of HTG6 marker, L of HTG7 marker, E of LEX3 marker were the specific alleles

  11. Pharmacokinetics of oral terbinafine in horses and Greyhound dogs.

    Science.gov (United States)

    Williams, M M; Davis, E G; KuKanich, B

    2011-06-01

    The objective of the study was to assess the pharmacokinetics of terbinafine administered orally to horses and Greyhound dogs. A secondary objective was to assess terbinafine metabolites. Six healthy horses and six healthy Greyhound dogs were included in the pharmacokinetic data. The targeted dose of terbinafine was 20 and 30 mg/kg for horses and dogs, respectively. Blood was collected at predetermined intervals for the quantification of terbinafine concentrations with liquid chromatography and mass spectrometry. The half-life (geometric mean) was 8.1 and 8.6 h for horses and Greyhounds, respectively. The mean maximum plasma concentration was 0.31 and 4.01 μg/mL for horses and Greyhounds, respectively. The area under the curve (to infinity) was 1.793 h·μg/mL for horses and 17.253 h·μg/mL for Greyhounds. Adverse effects observed in one study horse included pawing at the ground, curling lips, head shaking, anxiety and circling, but these resolved spontaneously within 30 min of onset. No adverse effects were noted in the dogs. Ions consistent with carboxyterbinafine, n-desmethylterbinafine, hydroxyterbinafine and desmethylhydroxyterbinafine were identified in horse and Greyhound plasma after terbinafine administration. Further studies are needed assessing the safety and efficacy of terbinafine in horses and dogs. © 2010 Blackwell Publishing Ltd.

  12. Exercise testing in Warmblood sport horses under field conditions.

    Science.gov (United States)

    Munsters, Carolien C B M; van Iwaarden, Alexandra; van Weeren, René; Sloet van Oldruitenborgh-Oosterbaan, Marianne M

    2014-10-01

    Regular exercise testing in Warmblood sport horses may, as in racing, potentially help to characterise fitness indices in different disciplines and at various competition levels and assist in understanding when a horse is 'fit to compete'. In this review an overview is given of the current state of the art of exercise testing in the Olympic disciplines of eventing, show jumping and dressage, and areas for further development are defined. In event horses, a simple four-step incremental exercise test measuring heart rate (HR), lactate concentration (LA) and velocity (V) is most often used. In dressage and riding horses, a wide variety of exercise tests have been developed, including incremental exercise tests, indoor riding tests and lunging tests. In show jumping, the use of a five-step incremental exercise test and exercise tests evaluating technical skills and fatigue of the horse has been reported. The velocity at a plasma LA of 4 mmol/L (VLA4) and HR recovery during submaximal exercise intensity have been shown to be the best parameters in event horses for predicting performance and impending injuries. In riding horses, the fitness level of horses is also an important determinant of injuries. Implementation of regular exercise testing and monitoring of training sessions may have important added value in the assessment of performance ability and potential future injuries in Warmblood sport horses. However, there is an urgent need to standardise methodologies and outcome parameters in order to make results comparable. Copyright © 2014 Elsevier Ltd. All rights reserved.

  13. Welfare issues of horses: an overview and practical recommendations

    Directory of Open Access Journals (Sweden)

    Elisabetta Canali

    2010-01-01

    Full Text Available The largest proportion of the world’s horses are still used for work in agriculture and traction, however in the western countries they are increasingly kept for recreational and social purposes, breeding, sport and competition. It is often assumed that horses enjoys better farming conditions than other species, yet they have specific needs which should be fulfilled in order to have a proper welfare. This paper will review the main welfare issues of horses and the following aspects will be considered: nutrition, housing and management, clinical problems, behaviour problems, training and riding, transportation, measuring welfare. Horses are social animals that live in groups in close contact with conspecifics. They spend most of their waking hours moving at walk, grazing and eating grass. Some of the constraints imposed on horses during the last centuries conflict to their naturally evolved behaviour. Effective and humane handling of horses positively affects many important aspects like the safety of man, the performance level and the welfare of horses. It is an essential condition for keeping horses that handlers, riders, trainers, farriers and veterinarians have proper knowledge of the behaviour of the horse in order to fulfil their natural needs and guarantee their welfare.

  14. Plasma serotonin in horses undergoing surgery for small intestinal colic

    Science.gov (United States)

    Torfs, Sara C.; Maes, An A.; Delesalle, Catherine J.; Pardon, Bart; Croubels, Siska M.; Deprez, Piet

    2015-01-01

    This study compared serotonin concentrations in platelet poor plasma (PPP) from healthy horses and horses with surgical small intestinal (SI) colic, and evaluated their association with postoperative ileus, strangulation and non-survival. Plasma samples (with EDTA) from 33 horses with surgical SI colic were collected at several pre- and post-operative time points. Serotonin concentrations were determined using liquid-chromatography tandem mass spectrometry. Results were compared with those for 24 healthy control animals. The serotonin concentrations in PPP were significantly lower (P serotonin was not a suitable prognostic factor in horses with SI surgical colic. PMID:25694668

  15. The Management of Horses during Fireworks in New Zealand

    Directory of Open Access Journals (Sweden)

    Gabriella Gronqvist

    2016-03-01

    Full Text Available Within popular press there has been much coverage of the negative effects associated with firework and horses. The effect of fireworks has been documented in companion animals, yet no studies have investigated the negative effects, or otherwise, of fireworks on horses. This study aims to document horse responses and current management strategies to fireworks via an online survey. Of the total number of horses, 39% (1987/4765 were rated as “anxious”, 40% (1816/4765 “very anxious” and only 21% (965/4765 rated as “not anxious” around fireworks. Running (82%, 912/1107 was the most common behaviour reported, with no difference between property type (p > 0.05 or location (p > 0.05. Possibly as a consequence of the high frequency of running, 35% (384/1107 of respondents reported having horses break through fences in response to fireworks and a quarter (26%, 289/1099 reported that their horse(s had received injuries associated with fireworks. The most common management strategy was moving their horse(s to a paddock away from the fireworks (77% and to stable/yard them (55%. However, approximately 30% reported these management strategies to be ineffective. Of the survey participants, 90% (996/1104 were against the sale of fireworks for private use.

  16. Genetic analysis of three South African horse breeds

    Directory of Open Access Journals (Sweden)

    E.G. Cothran

    1998-07-01

    Full Text Available Genetic variability at 7 blood-group and 10 biochemical genetic loci was examined in 3 South African horse breeds, the Nooitgedacht, Boerperd and Basuto Pony. Observed heterozygosity for these breeds was intermediate for domestic horses, with the highest heterozygosity in the Boerperd and the lowest in the Basuto Pony. The 3 breeds show greater genetic similarity to each other than to other domestic horse breeds. Compared to other breeds, the South African breeds show greater genetic similarity to breeds such as the Thoroughbred, Holstein, Trakehner and Hanovarian and also to North American breeds such as the Saddlebred, Standardbred and Morgan Horse.

  17. [Occurrence of Salmonella spp. and shigatoxin-producing escherichia coli (STEC) in horse faeces and horse meat products].

    Science.gov (United States)

    Pichner, Rohtraud; Sander, Andrea; Steinrück, Hartmut; Gareis, Manfred

    2005-01-01

    In order to assess the relevance of horses as a possible reservoir of Salmonella and Shigatoxin-producing Escherichia coli (STEC), 400 samples of horse faeces and 100 samples of horse meat products were examined by PCR-screening methods. Salmonella enterica was not found in any of the samples. One faeces-sample and one horse meat product were proved to be STEC positive. The STEC-strain from faecal origin belonged to the serotype 0113:H21 and had the stx 2c gene and the enterohemolysin gene. The STEC-strain isolated from a horse meat product had the serotype O87:H16 and the stx 2d gene. The results indicate a very low risk for human to get a Salmonella- or EHEC- infection from horses in Germany.

  18. Serum amyloid A and haptoglobin concentrations in serum and peritoneal fluid of healthy horses and horses with acute abdominal pain

    DEFF Research Database (Denmark)

    Pihl, Tina Holberg; Andersen, Pia Haubro; Kjelgaard-Hansen, Mads

    2013-01-01

    BACKGROUND: Peritoneal fluid (PF) analysis is a valuable diagnostic tool in equine medicine. Markers such as serum amyloid A (SAA) and haptoglobin (Hp) could facilitate the diagnosis of inflammatory abdominal conditions. OBJECTIVES: The objectives were to (1) establish reference intervals (RI......) for SAA and Hp in serum and PF in healthy horses, (2) compare SAA and Hp concentrations between healthy horses and horses with colic, and (3) to assess the correlation between serum and PF concentrations. METHODS: Serum amyloid A and Hp concentrations were determined by automated assays in prospectively...... enrolled healthy reference horses and horses with colic. RIs were calculated, group concentrations were compared by Student's t-test, and Pearson's correlation for serum and PF concentrations were determined. RESULTS: In healthy horses (n = 62) the measurements for SAA were below the detection limit (0...

  19. Trojan Horse Particle Invariance: An Extensive Study

    International Nuclear Information System (INIS)

    Pizzone, R. G.; Spitaleri, C.; Sergi, M. L.; Lamia, L.; Cognata, M. La; Spartá, R.; Tumino, A.; Bertulani, C. A.; Blokhintsev, L.; Burjan, V.; Kroha, V.; Mrazek, J.; Mukhamedzhanov, A. M.

    2014-01-01

    In the last decades, the Trojan Horse method (THM) has played a crucial role for the measurement of several particle (both neutron and charged one) induced cross sections for reactions of astrophysical interest. To better understand its cornerstones and its applications to physical cases, many tests were performed to verify all its properties and the possible future perspectives. The Trojan Horse nucleus invariance proves the relatively simple approach allowed by the pole approximation and sheds light in the involved reaction mechanisms. Here we shortly review the complete work for the binary 2 H(d,p) 3 H, 6 Li(d,α) 4 He, 6 Li(p,α) 3 He, 7 Li(p,α) 4 He reactions, by using the quasi free reactions after break-ups of different nuclides. Results are compared assuming the 6 Li and 3 He break-up in the case of the d(d,p)t, 6 Li(d,α) 4 He reactions and considering the 2 H and 3 He break-up for 6 Li(p,α) 3 He, 7 Li(p,α) 4 He reactions. These results, regardless of the Trojan Horse particle or the break-up scheme, confirms the applicability of the standard description of the THM and suggests the independence of binary indirect cross section on the chosen Trojan Horse nuclei for a whole spectra of different cases. This gives a strong basis for the understanding of the quasi-free mechanism which is the foundation on which the THM lies. (author)

  20. An ethological study of young horses

    OpenAIRE

    Pavla Šišková; Iva Jiskrová; Vladimír Mikule

    2006-01-01

    In the present study called “An Ethological Study of Young Horses” we focused on the behaviour of foals from their birth to separation from their mother. We observed and analysed their behaviour and daily activities, and from the achieved results we drew conclusions for practical horse breeding. We studied the following forms of behaviour of the foals: feeding behaviour (sucking, drinking, eating roughage and concentrates, gleaning, coprophagia), defecation and micturition, comfortable behavi...

  1. Pharmacokinetics of oral terbinafine in adult horses.

    Science.gov (United States)

    Younkin, T J; Davis, E G; Kukanich, B

    2017-08-01

    The primary study objective was to compare the pharmacokinetics of p.o. terbinafine alone to p.o. terbinafine administered with p.o. cimetidine in healthy adult horses. The second objective was to assess the pharmacokinetics of terbinafine when administered per rectum in two different suspensions at 30 mg/kg to adult horses. Six healthy adult horses were included in this crossover study. Plasma terbinafine concentrations were quantified with liquid chromatography and mass spectrometry. The half-life (geometric mean) was 8.38 and 10.76 h, for p.o. alone and p.o. with cimetidine, respectively. The mean maximum plasma concentrations were 0.291 μg/mL at 1.54 h and 0.418 μg/mL at 1.28 h for p.o. alone and p.o. with cimetidine, respectively. Terbinafine with cimetidine had an average C MAX 44% higher and the relative F was 153% compared p.o. terbinafine alone, but was not statistically different (P > 0.05). Terbinafine was infrequently detected when administered per rectum in two different suspensions (water or olive oil). Minor adverse effects included oral irritation, fever, and colic. All resolved spontaneously. More pharmacokinetic studies are indicated assessing drug-drug interactions and using multiple dosing intervals to improve our knowledge of effective oral dosing, the potential for drug accumulation, and systemic adverse effect of terbinafine in horses. © 2016 John Wiley & Sons Ltd.

  2. AHP 47: YELLOW-HEAD HORSE

    Directory of Open Access Journals (Sweden)

    Sangs rgyas bkra shis སངས་རྒྱས་བཀྲ་ཤིས།

    2017-04-01

    Full Text Available My family had a stallion we called Rta mgo ser 'Yellow-Head Horse'. Father and two of his brothers occasionally rode it. Father said that Yellow-Head was very wild when it was taken to join local horseraces. I didn't believe that because Yellow-Head was very gentle when Mother rode it to the local monastery and also when I rode it.

  3. SS-HORSE method for studying resonances

    Energy Technology Data Exchange (ETDEWEB)

    Blokhintsev, L. D. [Moscow State University, Skobeltsyn Institute of Nuclear Physics (Russian Federation); Mazur, A. I.; Mazur, I. A., E-mail: 008043@pnu.edu.ru [Pacific National University (Russian Federation); Savin, D. A.; Shirokov, A. M. [Moscow State University, Skobeltsyn Institute of Nuclear Physics (Russian Federation)

    2017-03-15

    A new method for analyzing resonance states based on the Harmonic-Oscillator Representation of Scattering Equations (HORSE) formalism and analytic properties of partial-wave scattering amplitudes is proposed. The method is tested by applying it to the model problem of neutral-particle scattering and can be used to study resonance states on the basis of microscopic calculations performed within various versions of the shell model.

  4. Occurrence of African horse sickness in a domestic dog without apparent ingestion of horse meat

    Directory of Open Access Journals (Sweden)

    Sybrand J. van Sittert

    2013-09-01

    Full Text Available This is the first case of African horse sickness (AHS in a dog where there was no apparent ingestion of horse meat. Significantly, the dog was part of a colony that resides in a Good Clinical Practice and Good Laboratory Practice accredited facility where complete history, weather and feeding records are maintained. The dog died after a week-long illness despite therapy. The principal post-mortem findings were severe hydrothorax and pulmonary consolidation (red hepatisation of the lungs. Histopathology revealed severe oedema and congestion of the lungs, hyaline degeneration of the myocardium and congestion of the liver sinusoids. Immunohistochemistry detected AHS-positive staining granules in the myocardium, whilst a real-time reverse transcription quantitative Polymerase chain reaction assay of tissue samples was strongly positive for African horse sickness virus nucleic acid. Other dogs on the property showed a 43%seroconversion rate to AHS.

  5. Horses help to maintain CERN's forests

    CERN Multimedia

    François Briard

    2016-01-01

    On the initiative of the Office National des Forêts, France’s forestry commission, horses are helping to remove trees cut down in CERN’s forests.   The CERN site covers 625 hectares, of which around 200 are fenced sites used for CERN’s research activities. The rest of the land consists of fields rented out to farmers and about 90 hectares of forests, mainly in France and managed by the French forestry commission, the Office National des Forêts (ONF), under an agreement with CERN signed in 2010. The upkeep of CERN’s forests requires regular maintenance work, which includes thinning out seedlings, selecting the strongest saplings and harvesting mature trees. This June, the ONF has decided to involve horses in the removal of felled trees from CERN’s woods in Prévessin.  As Florent Daloz, the logger entrusted with this activity by the ONF, explains, the use of horses to haul timber completely died out i...

  6. Distortion Effects on Trojan Horse Applications

    International Nuclear Information System (INIS)

    Pizzone, R. G.; Spitaleri, C.; La Cognata, M.; Lamia, L.; Romano, S.; Mukhamedzhanov, A. M.; Blokhintsev, L. D.; Bertulani, C. A.; Irgaziev, B. F.

    2011-01-01

    The widths of the spectator momentum distributions in several nuclei, which have been used as Trojan Horses, have been obtained as a function of the transferred momentum. Applications of Trojan Horse method will also be discussed. The study of processes relevant for astrophysics involving light nuclei has increased in the last decades due to the development of indirect methods. The present paper will also help to point out the distortion effects which arise at low energies in the study of three-body processes and will suggest some way to by-pass them in Trojan Horse Method (THM) applications. The goal of this paper is to compare the experimental momentum distribution of the spectator in the bound state a = (sx) extracted from the 2 → 3 particles (breakup, or breakup with rearrangement) reactions with the theoretical one. The theoretical momentum distribution has been calculated for the target a = (sx) using the Hulthen potential for a = d and Woods-Saxon one with the standard geometrical parameters, radius r 0 = 1.25 fm and diffuseness a = 0.65 fm, for other nuclei. (author)

  7. Tamoxifen induces apoptotic neutrophil efferocytosis in horses.

    Science.gov (United States)

    Olave, C; Morales, N; Uberti, B; Henriquez, C; Sarmiento, J; Ortloff, A; Folch, H; Moran, G

    2018-03-01

    Macrophages and neutrophils are important cellular components in the process of acute inflammation and its subsequent resolution, and evidence increasingly suggests that they play important functions during the resolution of chronic, adaptive inflammatory processes. Exacerbated neutrophil activity can be harmful to surrounding tissues; this is important in a range of diseases, including allergic asthma and chronic obstructive pulmonary disease in humans, and equine asthma (also known as recurrent airway obstruction (RAO). Tamoxifen (TX) is a non-steroidal estrogen receptor modulator with effects on cell growth and survival. Previous studies showed that TX treatment in horses with induced acute pulmonary inflammation promoted early apoptosis of blood and BALF neutrophils, reduction of BALF neutrophils, and improvement in animals' clinical status. The aim of this study was to describe if TX induces in vitro efferocytosis of neutrophils by alveolar macrophages. Efferocytosis assay, myeloperoxidase (MPO) detection and translocation phosphatidylserine (PS) were performed on neutrophils isolated from peripheral blood samples from five healthy horses. In in vitro samples from heathy horses, TX treatment increases the phenomenon of efferocytosis of peripheral neutrophils by alveolar macrophages. Similar increases in supernatant MPO concentration and PS translocation were observed in TX-treated neutrophils, compared to control cells. In conclusion, these results confirm that tamoxifen has a direct effect on equine peripheral blood neutrophils, through stimulation of the engulfment of apoptotic neutrophils by alveolar macrophages.

  8. Australian bat lyssavirus infection in two horses.

    Science.gov (United States)

    Shinwari, Mustaghfira Wafa; Annand, Edward J; Driver, Luke; Warrilow, David; Harrower, Bruce; Allcock, Richard J N; Pukallus, Dennis; Harper, Jennifer; Bingham, John; Kung, Nina; Diallo, Ibrahim S

    2014-10-10

    In May 2013, the first cases of Australian bat lyssavirus infections in domestic animals were identified in Australia. Two horses (filly-H1 and gelding-H2) were infected with the Yellow-bellied sheathtail bat (YBST) variant of Australian bat lyssavirus (ABLV). The horses presented with neurological signs, pyrexia and progressing ataxia. Intra-cytoplasmic inclusion bodies (Negri bodies) were detected in some Purkinje neurons in haematoxylin and eosin (H&E) stained sections from the brain of one of the two infected horses (H2) by histological examination. A morphological diagnosis of sub-acute moderate non-suppurative, predominantly angiocentric, meningo-encephalomyelitis of viral aetiology was made. The presumptive diagnosis of ABLV infection was confirmed by the positive testing of the affected brain tissue from (H2) in a range of laboratory tests including fluorescent antibody test (FAT) and real-time PCR targeting the nucleocapsid (N) gene. Retrospective testing of the oral swab from (H1) in the real-time PCR also returned a positive result. The FAT and immunohistochemistry (IHC) revealed an abundance of ABLV antigen throughout the examined brain sections. ABLV was isolated from the brain (H2) and oral swab/saliva (H1) in the neuroblastoma cell line (MNA). Alignment of the genome sequence revealed a 97.7% identity with the YBST ABLV strain. Crown Copyright © 2014. Published by Elsevier B.V. All rights reserved.

  9. Brainstem auditory evoked potentials in horses

    Directory of Open Access Journals (Sweden)

    Juliana Almeida Nogueira da Gama

    2016-04-01

    Full Text Available ABSTRACT: The brainstem auditory evoked potential (BAEP evaluates the integrity of the auditory pathways to the brainstem. The aim of this study was to evoke BAEPs in 21 clinically normal horses. The animals were sedated with detomidine hydrochloride (0.013mg.kg-1 BW. Earphones were inserted and rarefaction clicks at 90 dB and noise masking at 40 dB were used. After performing the test, the latencies of waves (I, II, III, IV, and V and interpeaks(I-III, III-V, and I-V were identified. The mean latencies of the waves were as follows: wave I, 2.4 ms; wave II, 2.24 ms; wave III, 3.61ms; wave IV, 4.61ms; and wave V, 5.49ms. The mean latencies of the interpeaks were as follows: I-III, 1.37ms; III-V, 1.88ms; and I-V, 3.26ms. This is the first study using BAEPs in horses in Brazil, and the observed latencies will be used as normative data for the interpretation of tests performed on horses with changes related to auditory system or neurologic abnormalities.

  10. Variability of albumin in blood serum as a possible reflection of evolutional influence of diluvial horses on population of native mountain horse in Serbia

    OpenAIRE

    Trailović Ružica; Savić Mila; Dimitrijević Vladimir; Jovanović Slobodan

    2013-01-01

    Native mountain horse is an autochthonous ungulata with a domicile extending to the whole mountaneous region of Serbia, south of the Sava and Danube rivers. Along with native horses of other Balkan countries it is classified as Mediterranean pony, but unlike Balkan horses such as Skiros, Pinea, Pindos, Karakachan, Bosnian mountineous horse etc., mountineous horses in Serbia neither have been morphologically described nor were of concern to the scientific co...

  11. Fracture of the medial intercondylar eminence of the tibia in horses treated by arthroscopic fragment removal (21 horses)

    OpenAIRE

    Rubio‐Martínez, L. M.; Redding, W. R.; Bladon, B.; Wilderjans, H.; Payne, R. J.; Tessier, C.; Geffroy, O.; Parker, R.; Bell, C.; Collingwood, F. A.

    2017-01-01

    Summary Background Fractures of the medial intercondylar eminence of the tibia (MICET) are scarcely reported in horses. Objectives To report the clinical and diagnostic findings, surgical treatment and outcome in a series of horses presented with MICET fracture and treated with arthroscopic fragment removal. Study design Multicentre retrospective case series. Methods Case records of horses diagnosed with MICET fractures that had undergone surgical treatment were reviewed. Follow‐up informatio...

  12. Climate change impact on operation of dams and hydroelectricity generation in the Northeastern United States

    Science.gov (United States)

    Ehsani, N.; Vorosmarty, C. J.; Fekete, B. M.

    2016-12-01

    We are using a large-scale, high-resolution, fully integrated hydrological/reservoir/hydroelectricity model to investigate the impact of climate change on the operation of 11037 dams and generation of electricity from 375 hydroelectric power plants in the Northeastern United States. Moreover, we estimate the hydropower potential of the region by energizing the existing non-powered dams and then studying the impact of climate change on the hydropower potential. We show that climate change increases the impact of dams on the hydrology of the region. Warmer temperatures produce shorter frozen periods, earlier snowmelt and elevated evapotranspiration rates, which when combined with changes in precipitation, are projected to increase water availability in winter but reduce it during summer. As a result, the water that is stored by dams will be more than ever a necessary part of the routine water systems operations to compensate for these seasonal imbalances. The function of dams as emergency water storage for creating drought resiliency will mostly diminish in the future. Building more dams to cope with the local impacts of climate change on water resources and to offset the increased drought vulnerability may thus be inevitable. Annual hydroelectricity generation in the region is 41 Twh. Our estimate of the annual hydropower potential of non-powered dams adds up to 350 Twh. Climate change may reduce hydropower potential from non-powered dams by up to 13% and reduce current hydroelectricity generation by up to 8% annually. Hydroelectricity generation and hydropower potential may increase in winter months and decline in months of summer and fall. These changes call for recalibration of dam operations and may raise conflict of interests in multipurpose dams.

  13. Carbon emission as a function of energy generation in hydroelectric reservoirs in Brazilian dry tropical biome

    International Nuclear Information System (INIS)

    Ometto, Jean P.; Cimbleris, André C.P.; Santos, Marco A. dos; Rosa, Luiz P.; Abe, Donato; Tundisi, José G.; Stech, José L.; Barros, Nathan; Roland, Fábio

    2013-01-01

    Most energy generation globally is fueled by coal and oil, raising concerns about greenhouse gas emissions. Hydroelectric reservoirs are anthropogenic aquatic systems that occur across a wide geographical extent, and, in addition to their importance for energy production, they have the potential to release two important greenhouse gases (GHGs), carbon dioxide and methane. We report results from an extensive study of eight hydroelectric reservoirs located in central and southeastern tropical Brazil. In the Brazilian dry tropical biome reservoirs, emissions (in tons of CO 2 Eq. per MW h) varied from 0.01 to 0.55, and decreased with reservoir age. Total emissions were higher in the reservoir lake when compared to the river downstream the dam; however, emissions per unit area, in the first kilometer of the river after the dam, were higher than that in the reservoir. The results showed, despite higher carbon emissions per energy production in the youngest reservoirs, lower emission from hydroelectric reservoirs from the studied region in relation to thermo electrical supply, fueled by coal or fossil fuel. The ratio emission of GHG per MWh produced is an important parameter in evaluating the service provided by hydroelectric reservoir and for energy planning policies. - Highlights: ► Hydroelectric reservoirs construction is growing worldwide. ► The effect of hydropower reservoir in the carbon cycle is dependent on environment characteristics. ► Carbon emissions per energy production are higher in the youngest tropical savannah reservoirs. ► Methane emissions decrease with reservoir age in tropical savannah reservoirs. ► In general, the effect of hydropower in the carbon cycle is lower than other energy sources

  14. Finland, Sweden and Austria doubled the share of hydroelectric power in EU

    International Nuclear Information System (INIS)

    Kangas, H.

    1996-01-01

    New EU countries Finland, Sweden and Austria increased the amount of hydroelectric power produced in EU in 1995 by more than 50 % compared to the year 1994. Especially Sweden and Austria are very dependent on hydroelectric power; the share of hydroelectric power is in Austria more than 70 % and even in Sweden it was nearly 50 %. The share of hydroelectric power in 1995 the EU region was 14 % of the total power demand. Due to the new EU countries the share of hydroelectric power of the total electric power demand, which would have decreased, increased by over 3 %. The increase of the electric power demand in Finland was lowest in the EU region, about 1.0 %, while it was in Greece 5.0 % and in Spain about 4.6 %. The share of nuclear power in the EU region was about 35 % in 1995. The most nuclear power dependent country in the EU was France there the share of nuclear power of the total electric power demand was 89 %. Both Finland and Sweden increased the production of back-pressure power generation in 1995. The share of back-pressure power generation in EU in 1995 was about 50 TWh which corresponds to some 1.5 % of the total electric power demand. About 50 % of the total electric power generation in EU was produced by condensing power generation. This production increased by 10 % compared to 1994. The netimport of electric power of EU increased by 80 % in Finland and Sweden, which are large importers of electric power outside the EU region

  15. Methicillin-resistant Staphylococcus aureus in horses and horse personnel: an investigation of several outbreaks.

    Science.gov (United States)

    van Duijkeren, E; Moleman, M; Sloet van Oldruitenborgh-Oosterbaan, M M; Multem, J; Troelstra, A; Fluit, A C; van Wamel, W J B; Houwers, D J; de Neeling, A J; Wagenaar, J A

    2010-02-24

    At the Veterinary Microbiological Diagnostic Center, the Netherlands, the percentage of methicillin-resistant Staphylococcus aureus (MRSA) isolates found in equine clinical samples increased from 0% in 2002 to 37% in 2008. MRSA of spa-type t064, belonging to MLST ST8 and spa-types t011 and t2123, both belonging to the livestock-associated MLST ST398, predominated. During an outbreak of post-surgical MRSA infections in horses at a veterinary teaching hospital in 2006/2007, MRSA isolates of spa-type t2123 were cultured from 7 horses and 4/61 personnel which indicated zoonotic transmission. After intervention the outbreak stopped. However, another outbreak occurred in 2008, where 17 equine MRSA isolates of spa-type t011 (n=12), t2123 (n=4), and t064 (n=1) were found. This time, 16/170 personnel were positive for MRSA with spa-type t011 (n=11) and t2123 (n=5). Personnel in close contact with horses were more often MRSA-positive (15/106) than those without (1/64). Screening of horses upon admission showed that 9.3% were MRSA-positive predominantly with spa-type t011. Weekly cross-sectional sampling of all hospitalized horses for 5 weeks showed that 42% of the horses were MRSA-positive at least once, again predominantly with spa-type t011, which suggests that nosocomial transmission took place. Fifty-three percent of the environmental samples were MRSA-positive, including samples from students' and staff members' rooms, and all were spa-type t011. This indicates that humans contribute to spreading the organism. Culturing of samples employing high-salt pre-enrichment performed better than a comparable method without pre-enrichment. Our results show that nosocomial transmission occurs in equine clinics and suggests that personnel play a role in the transmission. Copyright 2009 Elsevier B.V. All rights reserved.

  16. Differences in extracellular matrix proteins between Friesian horses with aortic rupture, unaffected Friesians and Warmblood horses.

    Science.gov (United States)

    Ploeg, M; Gröne, A; van de Lest, C H A; Saey, V; Duchateau, L; Wolsein, P; Chiers, K; Ducatelle, R; van Weeren, P R; de Bruijn, M; Delesalle, C

    2017-09-01

    Unlike in Warmblood horses, aortic rupture is quite common in Friesian horses, in which a hereditary trait is suspected. The aortic connective tissue in affected Friesians shows histological changes such as medial necrosis, elastic fibre fragmentation, mucoid material accumulation and fibrosis with aberrant collagen morphology. However, ultrastructural examination of the collagen fibres of the mid-thoracic aorta has been inconclusive in further elucidating the pathogenesis of the disease. To assess several extracellular matrix (ECM) components biochemically in order to explore a possible underlying breed-related systemic ECM defect in Friesians with aortic rupture. Cadaver study. Tissues from affected Friesians (n = 18), unaffected Friesians (n = 10) and Warmblood horses (n = 30) were compared. Samples were taken from the thoracic aorta at the level of the rupture site, from two locations caudal to the rupture and from the deep digital flexor tendon. Total collagen content, post-translational modifications of collagen formation including lysine hydroxylation, and hydroxylysylpyridinoline (HP), lysylpyridinoline (LP) and pyrrole cross-links were analysed. Additionally, elastin cross-links, glycosaminoglycan content and matrix metalloproteinase (MMP) activity were assessed. Significantly increased MMP activity and increased LP and HP cross-linking, lysine hydroxylation and elastin cross-linking were found at the site of rupture in affected Friesians. These changes may reflect processes involved in healing and aneurysm formation. Unaffected Friesians had less lysine hydroxylation and pyrrole cross-linking within the tendons compared with Warmblood horses. No differences in the matrix of the aorta were found between normal Warmbloods and Friesian horses. Small sample size. The differences in collagen parameters in tendon tissue may reflect differences in connective tissue metabolism between Friesians and Warmblood horses. © 2017 EVJ Ltd.

  17. Analysis of breed effects on semen traits in light horse, warmblood, and draught horse breeds.

    Science.gov (United States)

    Gottschalk, Maren; Sieme, Harald; Martinsson, Gunilla; Distl, Ottmar

    2016-05-01

    In the present study, systematic effects on semen quality traits were investigated in 381 stallions representing 22 breeds. All stallions were used for AI either at the Lower Saxon National Stud Celle or the North Rhine-Westphalian National Stud Warendorf. A total of 71,078 fresh semen reports of the years 2001 to 2014 were edited for analysis of gel-free volume, sperm concentration, total number of sperm, progressive motility, and total number of progressively motile sperm. Breed differences were studied for warmblood and light horse breeds of both national studs (model I) and for warmblood breeds and the draught horse breed Rhenish German Coldblood from the North Rhine-Westphalian National stud (model II) using mixed model procedures. The fixed effects of age class, year, and month of semen collection had significant influences on all semen traits in both analyses. A significant influence of the horse breed was found for all semen traits but gel-free volume in both statistical models. Comparing warmblood and light horse stallions of both national studs, we observed highest sperm concentrations, total numbers of sperm, and total numbers of progressively motile sperm in Anglo-Arabian stallions. The draught horse breed Rhenish German Coldblood had the highest least squares means for gel-free volume, whereas all other investigated semen traits were significantly lower in this breed compared to the warmblood stallions under study. The variance components among stallions within breeds were significant for all semen traits and accounted for 40% to 59% of the total variance. The between-breed-variance among stallions was not significant underlining the similar size of the random stallion effect in each of the horse breeds analyzed here. In conclusion, breed and stallion are accounting for a significant proportion of the variation in semen quality. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. Characterization of equine vitamin D-binding protein, development of an assay, and assessment of plasma concentrations of the protein in healthy horses and horses with gastrointestinal disease.

    Science.gov (United States)

    Pihl, Tina H; Jacobsen, Stine; Olsen, Dorthe T; Højrup, Peter; Grosche, Astrid; Freeman, David E; Andersen, Pia H; Houen, Gunnar

    2017-06-01

    OBJECTIVE To purify and characterize equine vitamin D-binding protein (VDBP) from equine serum and to evaluate plasma concentrations of VDBP in healthy horses and horses with gastrointestinal injury or disease. ANIMALS 13 healthy laboratory animals (8 mice and 5 rabbits), 61 healthy horses, 12 horses with experimentally induced intestinal ischemia and reperfusion (IR), and 59 horses with acute gastrointestinal diseases. PROCEDURES VDBP was purified from serum of 2 healthy horses, and recombinant equine VDBP was obtained through a commercial service. Equine VDBP was characterized by mass spectrometry. Monoclonal and polyclonal antibodies were raised against equine VDBP, and a rocket immunoelectrophoresis assay for equine VDBP was established. Plasma samples from 61 healthy horses were used to establish working VDBP reference values for study purposes. Plasma VDBP concentrations were assessed at predetermined time points in horses with IR and in horses with naturally occurring gastrointestinal diseases. RESULTS The working reference range for plasma VDBP concentration in healthy horses was 531 to 1,382 mg/L. Plasma VDBP concentrations were significantly decreased after 1 hour of ischemia in horses with IR, compared with values prior to induction of ischemia, and were significantly lower in horses with naturally occurring gastrointestinal diseases with a colic duration of < 12 hours than in healthy horses. CONCLUSIONS AND CLINICAL RELEVANCE Plasma VDBP concentrations were significantly decreased in horses with acute gastrointestinal injury or disease. Further studies and the development of a clinically relevant assay are needed to establish the reliability of VDBP as a diagnostic and prognostic marker in horses.

  19. Veterinary problems of endurance horses in England and Wales.

    Science.gov (United States)

    Nagy, A; Dyson, S J; Murray, J K

    2017-05-01

    Several studies have shown that a considerable proportion of horses are eliminated from endurance rides due to lameness and metabolic problems. Limited information is available on specific veterinary issues in endurance horses and there are no descriptive data on veterinary problems in a large population of endurance horses. The aim of this study was to describe veterinary problems occurring in endurance horses in England and Wales, the regions of the United Kingdom where endurance rides are organised and regulated by Endurance Great Britain (Endurance GB). A comprehensive online self-completed questionnaire was used for data collection (30th December 2015-29th February 2016) All members of Endurance GB who were the main rider of one or more endurance horses were eligible to participate. From the target population of 1209 horses, 190 questionnaires were completed by riders, resulting in a 15.7% response rate. The most common rider-reported veterinary problem was lameness, affecting 152/190 (80.0%) of endurance horses at some point during their careers and 101/190 (53.2%) of horses in the previous 12 months. Detailed information on the most recent episode of lameness was available for 147 horses. Seventy-six percent of these lameness episodes (112/147) had been initially identified by a veterinarian, but only 52% of these lameness episodes were investigated further by a veterinarian, despite the high proportion of horses affected by lameness and the proportion of horses with recurrent lameness episodes. The second most common veterinary problem was thoracolumbar region pain, followed by non-specific cough, skin disease and colic. Education of endurance riders may improve the number, quality and timing of veterinary investigations, especially for lameness and thoracolumbar region pain. Copyright © 2017 Elsevier B.V. All rights reserved.

  20. Spotted phenotypes in horses lost attractiveness in the Middle Ages

    DEFF Research Database (Denmark)

    Wutke, Saskia; Benecke, Norbert; Sandoval-Castellanos, Edson

    2016-01-01

    were influenced by humans. Our results from genotype analyses show a significant increase in spotted coats in early domestic horses (Copper Age to Iron Age). In contrast, medieval horses carried significantly fewer alleles for these phenotypes, whereas solid phenotypes (i.e., chestnut) became dominant...