WorldWideScience

Sample records for housing facilities equipped

  1. 14 CFR 145.103 - Housing and facilities requirements.

    Science.gov (United States)

    2010-01-01

    ... TRANSPORTATION (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES REPAIR STATIONS Housing, Facilities, Equipment... provide— (1) Housing for the facilities, equipment, materials, and personnel consistent with its ratings...) Sufficient work space and areas for the proper segregation and protection of articles during all maintenance...

  2. Evaluation of the air quality in pig housing facilities equipped with a liquid-solid separation system

    International Nuclear Information System (INIS)

    Lavoie, J.; Beaudet, Y.; Letourneau, C.; Godbout, S.; Lemay, S.; Belzile, M.; Lachance, I.; Pouliot, F.

    2006-01-01

    A new regulation regarding agricultural operations in Quebec was passed in June 2002. It stated the new standards for managing phosphorous generated from animal livestock. The regulation is intended to protect the environment, more specifically, water, soil and air quality. This new regulation stipulates that agricultural producers acquire a balanced phosphorous assessment by 2010. In order to achieve this, a system is needed to separate solid and liquid pig manure on a daily basis. Producers must also comply with environmental requirements on odour elimination and atmospheric control. The proposed solid-liquid separation system would improve the indoor and outdoor air quality at pig housing facilities by reducing toxic gas and bioaerosol formation. In addition, it would contribute to stream purification. The solid-liquid separation technique was successfully tested in a pilot project at a mini pig housing facility. It was concluded that type of separation equipment system could readily used for other types of animal farming, such as cattle raising. 41 refs., 13 tabs., 12 figs

  3. Site Characterization Report ORGDP Diffusion Facilities Permanent Shutdown K-700 Power House and K-27 Switch Yard/Switch House

    Energy Technology Data Exchange (ETDEWEB)

    Thomas R.J., Blanchard R.D.

    1988-06-13

    The K-700 Power House area, initially built to supply power to the K-25 gaseous diffusion plant was shutdown and disassembled in the 1960s. This shutdown was initiated by TVA supplying economical power to the diffusion plant complex. As a result of world wide over production of enriched, reactor grade U{sup 235}, the K-27 switch yard and switch house area was placed in standby in 1985. Subsequently, as the future production requirements decreased, the cost of production increased and the separation technologies for other processes improved, the facility was permanently shutdown in December, 1987. This Site Characterization Report is a part of the FY-88 engineering Feasibility Study for placing ORGDP Gaseous Diffusion Process facilities in 'Permanent Shutdown'. It is sponsored by the Department of Energy through Virgil Lowery of Headquarters--Enrichment and through Don Cox of ORO--Enrichment Operations. The primary purpose of these building or site characterization reports is to document, quantify, and map the following potential problems: Asbestos; PCB containing fluids; Oils, coolants, and chemicals; and External contamination. With the documented quantification of the concerns (problems) the Engineering Feasibility Study will then proceed with examining the potential solutions. For this study, permanent shutdown is defined as the securing and/or conditioning of each facility to provide 20 years of safe service with minimal expenditures and, where feasible, also serving DOE's needs for long-term warehousing or other such low-risk use. The K-700 power house series of buildings were either masonry construction or a mix of masonry and wood. The power generating equipment was removed and sold as salvage in the mid 1960s but the buildings and auxiliary equipment were left intact. The nine ancillary buildings in the power house area use early in the Manhattan Project for special research projects, were left intact minus the original special equipment

  4. 9 CFR 3.79 - Mobile or traveling housing facilities.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Mobile or traveling housing facilities... Transportation of Nonhuman Primates 2 Facilities and Operating Standards § 3.79 Mobile or traveling housing facilities. (a) Heating, cooling, and temperature. Mobile or traveling housing facilities must be...

  5. Aircraft Test & Evaluation Facility (Hush House)

    Data.gov (United States)

    Federal Laboratory Consortium — The Aircraft Test and Evaluation Facility (ATEF), or Hush House, is a noise-abated ground test sub-facility. The facility's controlled environment provides 24-hour...

  6. Air Motion and Thermal Environment in Pig Housing Facilities with Diffuse Inlet

    DEFF Research Database (Denmark)

    Jacobsen, Lis

    A ventilation system with ambient air supply through diffuse ceiling used in pig production facilities is presented. The climatic conditions were examined both experimentally and numerically in an full scale experimental room and the inlet boundary conditions of the diffuse inlet were examined...... in ambient temperature and air exchange rate. The effect of housing equipment on environmental conditions has been examined both experimental and numerically and it was found that impervious housing equipment has a significant effect on the climatic conditions close to the wall in the occupational zone...... in a wind tunnel model. In the full scale experiments the focus has been on the correlation between variations in ambient climatic conditions and changes in environmental condition in the occupational zone. It was found that the environmental conditions in the occupational zone were independent on changes...

  7. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  8. Delivering Sustainable Facilities Management in Danish Housing Estates

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Jesper Ole; Jensen, Per Anker

    2009-01-01

    Housing plays a central role in sustainable development due to large resource consumption and as transition agent towards sustainable lifestyles. The aim is to evaluate current practice of housing administration in Denmark in order to evaluate if and how sustainable facilities management is suppo......Housing plays a central role in sustainable development due to large resource consumption and as transition agent towards sustainable lifestyles. The aim is to evaluate current practice of housing administration in Denmark in order to evaluate if and how sustainable facilities management...... is supporting social, economical and environmental sustainable development. Sustainable facility management (SFM) is as an 'umbrella' for various ways of reducing flows of energy, water and waste in the daily operation of the buildings, for instance by regular monitoring the consumption, by using 'green......-setting including the ownership of the building, the organisation of daily operation, the roles and relation between stakeholders are equally important in order to utilise the monitoring as a mean for transformation towards sustainable buildings and lifestyles....

  9. Do Urban Rail Transit Facilities Affect Housing Prices? Evidence from China

    Directory of Open Access Journals (Sweden)

    Xu Zhang

    2016-04-01

    Full Text Available Urban rail transit facilities play a critical role in citizen’s social activities (e.g., residence, work and education. Using panel data on housing prices and urban rail transit facilities for 35 Chinese cities for 2002 to 2013, this study constructs a panel data model to evaluate the effect of rail transit facilities on housing prices quantitatively. A correlation test reveals significant correlations between housing prices and rail transit facilities. Empirical results demonstrate that rail transit facilities can markedly elevate real estate prices. Quantitatively, a 1% increase in rail transit mileage improves housing prices by 0.0233%. The results highlight the importance of other factors (e.g., per capita GDP, land price, investment in real estate and population density in determining housing prices. We also assess the effects of expectations of new rail transit lines on housing prices, and the results show that expectation effects are insignificant. These findings encourage Chinese policy makers to take rail transit facilities into account in achieving sustainable development of real estate markets.

  10. 9 CFR 3.77 - Sheltered housing facilities.

    Science.gov (United States)

    2010-01-01

    ... surrounded by a natural barrier that restricts the nonhuman primates to the housing facility and protects... lighting cycle of either natural or artificial light. Lighting must be uniformly diffused throughout animal..., and the Administrator gives written permission (g) Public barriers. Fixed public exhibits housing...

  11. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    International Nuclear Information System (INIS)

    1994-01-01

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs

  12. Diagnostic x-ray equipment compliance and facility survey. Recommended procedures for equipment and facility testing

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    The Radiation Protection Bureau has set out guidelines for the testing of diagnostic x-ray equipment and facilities. This guide provides information for the x-ray inspector, test engineer, technologist, medical physicist and any other person responsible for verifying the regulatory compliance or safety of diagnostic x-ray equipment and facilities. Diagnostic x-radiation is an essential part of present day medical practice. The largest contributor of irradiation to the general population comes from diagnostic x-radiation. Although individual irradiations are usually small, there is a concern of possible excess cancer risk when large populations are irradiated. Unnecessary irradiations to patients from radiological procedures can be significantly reduced with little or no decrease in the value of medical diagnostic information. This can be achieved by using well designed x-ray equipment which is installed, used and maintained by trained personnel, and by the adoption of standardized procedures. In general, when patient surface dose is reduced, there is a corresponding decrease in dose to x-ray equipment operators and other health care personnel. 2 tabs., 4 figs.

  13. 9 CFR 3.75 - Housing facilities, general.

    Science.gov (United States)

    2010-01-01

    .... Housing facilities and areas used for storing animal food or bedding must be free of any accumulation of trash, waste material, junk, weeds, and other discarded materials. Animal areas inside of housing... carrying out other husbandry requirements. (e) Storage. Supplies of food and bedding must be stored in a...

  14. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    Background: Facilities and equipment are known to contribute to improved patient care and outcome. Hospitals for sub‑specialized pediatric anesthetic service are routinely available worldwide. In Nigeria, such hospitals now exist. It is therefore relevant to study the facilities and equipment available for pediatric anesthetic ...

  15. 9 CFR 3.78 - 0utdoor housing facilities.

    Science.gov (United States)

    2010-01-01

    ... AGRICULTURE ANIMAL WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment, and... facility at that time of year without stress or discomfort, may be kept in outdoor facilities. (b) Shelter...) The housing facility is surrounded by a natural barrier that restricts the nonhuman primates to the...

  16. Low-energy house in Sisimiut - Measurement equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hvidthoeft Delff Andersen, P.; Rode, C.; Madsen, Henrik

    2013-08-15

    This paper documents the measurement equipment in a low-energy house in Sisimiut, Greenland. Detailed measurements are being taken on energy consumption, indoor temperatures, floor heating, ventilation, open/closed state of doors and windows, and indoors climate. Equipped with a central control unit, experiments can be designed in order to study heat dynamics of the building. It is described how to plan and execute such experiments in one apartment in the building. The building also features both a solar thermal system and extra buffer tank facilitating testing of storage strategies on the power generated by the solar thermal system. A weather station equipped with thermometer, pyranometer and anemometer is installed on the building as well. Finally, it is described how to retrieve data from an SQL server which is configured to take monthly backups. R functions have been implemented to fetch and prepare the data for time series analysis. Examples are given on the use of these. (Author)

  17. 7 CFR 58.131 - Equipment and facilities.

    Science.gov (United States)

    2010-01-01

    .... Receiving stations shall comply with the applicable sections of this subpart covering premises, buildings, facilities, equipment, utensils, personnel, cleanliness and health. (2) Transfer stations. Transfer stations... equipment, piping and utensils and personnel—cleanliness and health. As climatic and operating conditions...

  18. Experimental equipment for an advanced ISOL facility

    International Nuclear Information System (INIS)

    Baktash, C.; Lee, I.Y.; Rehm, K.E.

    1999-01-01

    This report summarizes the proceedings and recommendations of the Workshop on the Experimental Equipment for an Advanced ISOL Facility which was held at Lawrence Berkeley National Laboratory on July 22--25, 1998. The purpose of this workshop was to discuss the performance requirements, manpower and cost estimates, as well as a schedule of the experimental equipment needed to fully exploit the new physics which can be studied at an advanced ISOL facility. An overview of the new physics opportunities that would be provided by such a facility has been presented in the White Paper that was issued following the Columbus Meeting. The reactions and experimental techniques discussed in the Columbus White Paper served as a guideline for the formulation of the detector needs at the Berkeley Workshop. As outlined a new ISOL facility with intense, high-quality beams of radioactive nuclei would provide exciting new research opportunities in the areas of: the nature of nucleonic matter; the origin of the elements; and tests of the Standard Model. After an introductory section, the following equipment is discussed: gamma-ray detectors; recoil separators; magnetic spectrographs; particle detectors; targets; and apparatus using non-accelerated beams

  19. Damage caused to houses and equipment by underground nuclear explosions

    International Nuclear Information System (INIS)

    Delort, F.; Guerrini, C.

    1969-01-01

    A description is given of the damaged caused to various structures, buildings, houses, mechanical equipment and electrical equipment by underground nuclear explosions in granite. For each type of equipment or building are given the limiting distances for a given degree of damage. These distances have been related to a parameter characterizing the movement of the medium; it is thus possible to generalize the results obtained in granite, for different media. The problem of estimating the damage caused at a greater distance from the explosion is considered. (authors) [fr

  20. Compensation of equipment housing elements of reactor units with heavy liquid metal coolant vessel temperature deformations

    International Nuclear Information System (INIS)

    Lebedevich, V.; Ahmetshin, M.; Mendes, D.; Kaveshnikov, S.; Vinogradov, A.

    2015-01-01

    In Russia a lot of different versions of fast reactors (FRs) are investigated and one of these is FR cooled by liquid lead and liquid lead-bismuth alloy. In this poster we are interested by FR with concrete vessel; its components are placed in cavities inside the vessel, and connected by a channel system. During the installation the equipment components are placed in several equipment housings. Between these housings there are cavities with coolant. The alignment of the housings should be provided. It can be broken by irregular concrete vessel heating during FR starting or other transition regimes. Our goal is to suggest a list of designing steps to compensate temperature deformations of equipment housing elements. A simplified model of equipment housing was suggested. It consists of two cylinders - tunnels in the concrete vessel, separated by a cavity filled by coolant and inert gas. The bottom part was considered as heated to 420 C. degrees while in the top part temperature decreased to 45 C. degrees (on the concrete surface). According to this data, results show that temperature gradient leads to a concrete layer dislocation of about 12.5 mm, which can lead to damage and breaking alignment. We propose the following solution to compensate for temperature deformation: -) to chisel out part of the upper top of the insulating concrete; -) to install an adequate misalignment of equipment housing elements preliminary; and -) to use a torsion system like a piston-type device for providing additional strength in order to compensate deformation and vibrations

  1. The strategic facilities management organisation in housing

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Jensen, Per Anker; Jensen, Jesper Ole

    2012-01-01

    implementation of sustainable facilities management in housing administration. The concept provides a frame for understanding the roles and relations of tenants, owners, administrators and operators. The paper is based on a Danish research project on environmentally sound building operation including literature...

  2. Hot conditioning equipment conceptual design report

    International Nuclear Information System (INIS)

    Bradshaw, F.W.

    1996-01-01

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage

  3. Hot conditioning equipment conceptual design report

    Energy Technology Data Exchange (ETDEWEB)

    Bradshaw, F.W., Westinghouse Hanford

    1996-08-06

    This report documents the conceptual design of the Hot Conditioning System Equipment. The Hot conditioning System will consist of two separate designs: the Hot Conditioning System Equipment; and the Hot Conditioning System Annex. The Hot Conditioning System Equipment Design includes the equipment such as ovens, vacuum pumps, inert gas delivery systems, etc.necessary to condition spent nuclear fuel currently in storage in the K Basins of the Hanford Site. The Hot Conditioning System Annex consists of the facility of house the Hot Conditioning System. The Hot Conditioning System will be housed in an annex to the Canister Storage Building. The Hot Conditioning System will consist of pits in the floor which contain ovens in which the spent nuclear will be conditioned prior to interim storage.

  4. Housing, Equipment, and Design Research and Scholarship: A Family and Consumer Sciences Perspective.

    Science.gov (United States)

    Beamish, Julia O.; Ahn, Mira; Seiling, Sharon

    2001-01-01

    Analysis of research on housing, equipment, and design (n=333) in the Journal of Home Economics/Journal of Family and Consumer Sciences (1985-2000), Home Economics Research Journal/Family and Consumer Sciences Research Journal (1985- 2000), and Housing and Society (1985-1999) found that articles declined by more than 50% and behavior theories were…

  5. Design of laboratory and animal housing unit for radionuclide studies

    International Nuclear Information System (INIS)

    Anon.

    1975-01-01

    The design of a combined analytical laboratory and animal housing facility is discussed. By having sample processing facilities in close proximity to the experimental animals, the necessity for transporting biological specimens long distances has been curtailed. In addition, complete radionuclide counting equipment has been installed so that samples need not leave the animal housing site for analysis, a feature based on radiological health requirements. (U.S.)

  6. 9 CFR 3.1 - Housing facilities, general.

    Science.gov (United States)

    2010-01-01

    ... and areas used for storing animal food or bedding must be free of any accumulation of trash, waste material, junk, weeds, and other discarded materials. Animal areas inside of housing facilities must be.... (e) Storage. Supplies of food and bedding must be stored in a manner that protects the supplies from...

  7. Support facilities

    International Nuclear Information System (INIS)

    Williamson, F.S.; Blomquist, J.A.; Fox, C.A.

    1977-01-01

    Computer support is centered on the Remote Access Data Station (RADS), which is equipped with a 1000 lpm printer, 1000 cpm reader, and a 300 cps paper tape reader with 500-foot spools. The RADS is located in a data preparation room with four 029 key punches (two of which interpret), a storage vault for archival magnetic tapes, card files, and a 30 cps interactive terminal principally used for job inquiry and routing. An adjacent room provides work space for users, with a documentation library and a consultant's office, plus file storage for programs and their documentations. The facility has approximately 2,600 square feet of working laboratory space, and includes two fully equipped photographic darkrooms, sectioning and autoradiographic facilities, six microscope cubicles, and five transmission electron microscopes and one Cambridge scanning electron microscope equipped with an x-ray energy dispersive analytical system. Ancillary specimen preparative equipment includes vacuum evaporators, freeze-drying and freeze-etching equipment, ultramicrotomes, and assorted photographic and light microscopic equipment. The extensive physical plant of the animal facilities includes provisions for holding all species of laboratory animals under controlled conditions of temperature, humidity, and lighting. More than forty rooms are available for studies of the smaller species. These have a potential capacity of more than 75,000 mice, or smaller numbers of larger species and those requiring special housing arrangements. There are also six dog kennels to accommodate approximately 750 dogs housed in runs that consist of heated indoor compartments and outdoor exercise areas

  8. Facility/equipment performance evaluation using microcomputer simulation analysis

    International Nuclear Information System (INIS)

    Chockie, A.D.; Hostick, C.J.

    1985-08-01

    A computer simulation analysis model was developed at the Pacific Northwest Laboratory to assist in assuring the adequacy of the Monitored Retrievable Storage facility design to meet the specified spent nuclear fuel throughput requirements. The microcomputer-based model was applied to the analysis of material flow, equipment capability and facility layout. The simulation analysis evaluated uncertainties concerning both facility throughput requirements and process duration times as part of the development of a comprehensive estimate of facility performance. The evaluations provided feedback into the design review task to identify areas where design modifications should be considered

  9. INNOVATIONS IN EQUIPMENT AND TECHNIQUES FOR THE BIOLOGY TEACHING LABORATORY.

    Science.gov (United States)

    BARTHELEMY, RICHARD E.; AND OTHERS

    LABORATORY TECHNIQUES AND EQUIPMENT APPROPRIATE FOR TEACHING BIOLOGICAL SCIENCE CURRICULUM STUDY BIOLOGY ARE EMPHASIZED. MAJOR CATEGORIES INCLUDE (1) LABORATORY FACILITIES, (2) EQUIPMENT AND TECHNIQUES FOR CULTURE OF MICRO-ORGANISMS, (3) LABORATORY ANIMALS AND THEIR HOUSING, (4) TECHNIQUES FOR STUDYING PLANT GROWTH, (5) TECHNIQUES FOR STUDYING…

  10. Practical approaches to implementing facility wide equipment strengthening programs

    International Nuclear Information System (INIS)

    Kincaid, R.H.; Smietana, E.A.

    1989-01-01

    Equipment strengthening programs typically focus on components required to ensure operability of safety related equipment or to prevent the release of toxic substances. Survival of non-safety related equipment may also be crucial to ensure rapid recovery and minimize business interruption losses. Implementing a strengthening program for non-safety related equipment can be difficult due to the large amounts of equipment involved and limited budget availability. EQE has successfully implemented comprehensive equipment strengthening programs for a number of California corporations. Many of the lessons learned from these projects are applicable to DOE facilities. These include techniques for prioritizing equipment and three general methodologies for anchoring equipment. Pros and cons of each anchorage approach are presented along with typical equipment strengthening costs

  11. 34 CFR 395.10 - The maintenance and replacement of vending facility equipment.

    Science.gov (United States)

    2010-07-01

    ... and replacement of vending facility equipment. The State licensing agency shall maintain (or cause to... 34 Education 2 2010-07-01 2010-07-01 false The maintenance and replacement of vending facility equipment. 395.10 Section 395.10 Education Regulations of the Offices of the Department of Education...

  12. A Guide for Equipping Industrial Arts Facilities.

    Science.gov (United States)

    American Industrial Arts Association, Washington, DC. Equipment Guide Committee.

    A guide for planning new and revising existing industrial arts facilities which gives a listing of tools and equipment recommended for each of the major areas of instruction (automotive and power mechanics, ceramics, drafting, electronics, elementary, general shop, graphic arts, metalworking, plastics, and woodworking). General descriptions and…

  13. Respiratory and protective equipment at a large nuclear facility

    International Nuclear Information System (INIS)

    Zippler, D.B.

    1975-12-01

    A variety of personal protective equipment is used in a large nuclear facility to protect employees against both nuclear and ordinary industrial materials. Equipment requirements are based on risk evaluation and may range from a minimum of shoe covers to whole body protection by air-supplied plastic suits. Types of equipment are listed and one-year costs are given. Criteria for evaluating and compartmentalizing risks are discussed. Air-supplied suits and hoods are discussed in detail

  14. Simplified static method for determining seismic loads on equipment in moderate and high hazard facilities

    International Nuclear Information System (INIS)

    Scott, M.A.; Holmes, P.A.

    1991-01-01

    A simplified static analysis methodology is presented for qualifying equipment in moderate and high-hazard facility-use category structures, where the facility use is defined in Design and Evaluation Guidelines for Department of Energy Facilities Subjected to Natural Phenomena Hazards, UCRL-15910. Currently there are no equivalent simplified static methods for determining seismic loads on equipment in these facility use categories without completing dynamic analysis of the facility to obtain local floor accelerations or spectra. The requirements of UCRL-15910 specify the use of open-quotes dynamicclose quotes analysis methods, consistent with Seismic Design Guidelines for Essential Buildings, Chapter 6, open-quotes Nonstructural Elements,close quotes TM5-809-10-1, be used for determining seismic loads on mechanical equipment and components. Chapter 6 assumes that the dynamic analysis of the facility has generated either floor response spectra or model floor accelerations. These in turn are utilized with the dynamic modification factor and the actual demand and capacity ratios to determine equipment loading. This complex methodology may be necessary to determine more exacting loads for hard to qualify equipment but does not provide a simple conservative loading methodology for equipment with ample structural capacity

  15. Optimal facility and equipment specification to support cost-effective recycling

    International Nuclear Information System (INIS)

    Redus, K.S.; Yuracko, K.L.

    1998-01-01

    The authors demonstrate a project management approach for D and D projects to select those facility areas or equipment systems on which to concentrate resources so that project materials disposition costs are minimized, safety requirements are always met, recycle and reuse goals are achieved, and programmatic or stakeholder concerns are met. The authors examine a facility that contains realistic areas and equipment, and they apply the approach to illustrate the different results that can be obtained depending on the strength or weakness of safety risk requirements, goals for recycle and reuse of materials, and programmatic or stakeholder concerns

  16. [Needs and self-reported quality of life of people with severe mental illness in sheltered housing facilities].

    Science.gov (United States)

    Wartmann, Lukas; Hartmann-Riemer, Matthias; Dinevski, Natascha; Siemerkus, Jakob; Fröbel, Rahel; Seifritz, Erich; Jäger, Matthias

    2018-05-28

    This paper investigates the subjective needs of psychiatric patients in relation to the housing conditions with an additional focus on inclusion and participation. Furthermore, it examines differences in clinical and socio-demographic parameters, self-measured quality of life, stage of recovery. In this quantitative cross-sectional study, we compared 50 patients in a psychiatric acute ward setting, who were looking for a residence in a sheltered housing facility with 50 patients in a sheltered housing facility using structured interviews. Patients living in a sheltered housing facility reported less unmet needs. However, no differences regarding inclusion and participation were found. More unmet needs were associated with poorer quality of life, and less social inclusion in both groups. Patients in sheltered housing facilities report less unmet needs. Nevertheless, more efforts are needed to regarding inclusion of these patients. A "supported inclusion"-approach should be considered.

  17. Hoisting appliances and fuel handling equipment at nuclear facilities

    International Nuclear Information System (INIS)

    1987-01-01

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection

  18. PFP Wastewater Sampling Facility

    International Nuclear Information System (INIS)

    Hirzel, D.R.

    1995-01-01

    This test report documents the results obtained while conducting operational testing of the sampling equipment in the 225-WC building, the PFP Wastewater Sampling Facility. The Wastewater Sampling Facility houses equipment to sample and monitor the PFP's liquid effluents before discharging the stream to the 200 Area Treated Effluent Disposal Facility (TEDF). The majority of the streams are not radioactive and discharges from the PFP Heating, Ventilation, and Air Conditioning (HVAC). The streams that might be contaminated are processed through the Low Level Waste Treatment Facility (LLWTF) before discharging to TEDF. The sampling equipment consists of two flow-proportional composite samplers, an ultrasonic flowmeter, pH and conductivity monitors, chart recorder, and associated relays and current isolators to interconnect the equipment to allow proper operation. Data signals from the monitors are received in the 234-5Z Shift Office which contains a chart recorder and alarm annunciator panel. The data signals are also duplicated and sent to the TEDF control room through the Local Control Unit (LCU). Performing the OTP has verified the operability of the PFP wastewater sampling system. This Operability Test Report documents the acceptance of the sampling system for use

  19. Mobile equipment maintenance at Elk Valley Coal Corporation Fording River

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2006-07-01

    Major loading and support equipment, haul trucks, and the number of staff and hourly tradesmen working in the maintenance manpower division at Elk Valley Coal are listed. Maintenance strategies are safety, high maintenance of equipment availabilities and reliability, cost reduction, and maximized productivity of assets. Maintenance assets comprise a large shop, shovel and drill crew, machine shop, light vehicle facility, line crew, radio technicians, and cranes. Most maintenance work is completed in- house. Fording River uses a Computerized Maintenance Management System (CMMS) that was developed in-house to match business needs. Several examples of the application of Reliability Centered Maintenance (RCM) are described. 12 figs., 2 tabs.

  20. Remotely operated top loading filter housing

    International Nuclear Information System (INIS)

    Ross, M.J.; Carter, J.A.

    1989-01-01

    A high-efficiency particulate air (HEPA) filter system was developed for the Fuel Processing Facility at the Idaho Chemical Processing Plant. The system utilizes commercially available HEPA filters and allows in-cell filters to be maintained using operator-controlled remote handling equipment. The remote handling tasks include transport of filters before and after replacement, removal and replacement of the filter from the housing, and filter containment

  1. Hoisting appliances and fuel handling equipment at nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-31

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection. 36 refs. Translation. The original text is published under the same guide number. The guide is valid from 5 January 1987 and will be in force until further notice.

  2. Investigation of water accumulation in an offgas test facility HEPA housing

    International Nuclear Information System (INIS)

    Speed, D.L.; Burns, D.B.; Van Pelt, W.B.; Burns, H.H.

    1997-01-01

    The Consolidated Incineration Facility, at the Department of Energy's Savannah River Site, is designed to treat solid and liquid RCRA hazardous and mixed wastes generated by site operations and clean-up activities. During CIF's pretrial burn campaigns in 1995, an appreciable amount of water was recovered from the HEPA housings. Questions were immediately raised as to the source of the water, and the degree of wetness of the filters during operation. There are two primary issues involved: Water could reduce the life expectancy and performance of the HEPA filters, housing, and associated ducting, and wet HEPAs also present radiological concerns for personnel during filter change-out. A similar phenomenon was noted at the Offgas Components Test Facility (OCTF), a 1/10 scale pilot of CIF's air pollution control system. Tests at OCTF indicated the water's most likely origin to be vapor condensing out from the flue gas stream due to excessive air in-leakage at housing door seals, ducting flanges, and actual holes in the ducting. The rate of accumulation bears no statistical correlation to such process parameters as steam flow, reheater outlet temperature and offgas velocity in the duct. Test results also indicated that the HEPA filter media is moistened by the initial process flow while the facility is being brought on line. However, even when the HEPA filters were manually drenched prior to startup, they became completely dry within four hours of the time steam was introduced to the reheater. Finally, no demonstrable relationship was found between the degree of filter media wetness and filter dP

  3. NORTH PORTAL - SANITARY SEWER CALCULATION - CHANGE HOUSE FACILITY No.5008

    International Nuclear Information System (INIS)

    Blackstone, R.

    1996-01-01

    The purpose of this design calculation is to determine the demand on the waste system and to size the three main sanitary sewer lines serving the Change House Facility No.5008, in accordance with the Uniform Plumbing Code (Section 4.4.1) and U.S. Department of Energy Order 6430.1A-1540 (Section 4.4.2)

  4. NORTH PORTAL - WATER HEATER CALCULATION - CHANGE HOUSE FACILITY No.5008

    International Nuclear Information System (INIS)

    R.B. Blackstone

    1996-01-01

    The purpose of this design analysis and calculation is to determine the demand for hot water in the Change House Facility and the selection of a water heater of appropriate size in accordance with the Uniform Plumbing Code (Section 4.4.1) and U.S. Department of Energy Order 6430.1A-1540 (Section 4.4.2)

  5. Damages of industrial equipments in the 1995 Hyougoken-Nanbu Earthquake

    International Nuclear Information System (INIS)

    Iwatsubo, Takuzo

    1997-01-01

    Hanshin-Awaji area has a population of approximately 3 million and many industries, including heavy industry, harbor facilities and international trading companies. The 1995 Hyougoken-Nanbu Earthquake occurred just in this area which is 25kmx2km oblong containing Kobe city. About 5,500 people were killed and 250,000 people lost their houses. Japan society of mechanical engineers organized the investigative committee of earthquake disaster of industrial equipments after the earthquake in order to investigate the disaster damages of industrial equipments and to give data for a design manual for mechanical equipments against earthquake excitation. This is an investigation report of the disaster damages of industrial machine equipments. Damages to machine equipment of industries in the high intensity region of the earthquake are illustrated. The mechanisms of the damages and measures against earthquake and safety of nuclear power plant design are discussed. Then it is known that the design of nuclear power plant is different from the general industrial facilities and the damage which was suffered in the general industrial facilities does not occur in the nuclear power plant. (J.P.N.)

  6. Damages of industrial equipments in the 1995 Hyougoken-Nanbu Earthquake

    Energy Technology Data Exchange (ETDEWEB)

    Iwatsubo, Takuzo [Kobe Univ. (Japan). Faculty of Engineering

    1997-03-01

    Hanshin-Awaji area has a population of approximately 3 million and many industries, including heavy industry, harbor facilities and international trading companies. The 1995 Hyougoken-Nanbu Earthquake occurred just in this area which is 25kmx2km oblong containing Kobe city. About 5,500 people were killed and 250,000 people lost their houses. Japan society of mechanical engineers organized the investigative committee of earthquake disaster of industrial equipments after the earthquake in order to investigate the disaster damages of industrial equipments and to give data for a design manual for mechanical equipments against earthquake excitation. This is an investigation report of the disaster damages of industrial machine equipments. Damages to machine equipment of industries in the high intensity region of the earthquake are illustrated. The mechanisms of the damages and measures against earthquake and safety of nuclear power plant design are discussed. Then it is known that the design of nuclear power plant is different from the general industrial facilities and the damage which was suffered in the general industrial facilities does not occur in the nuclear power plant. (J.P.N.)

  7. Residential equipment systems and dweller. Jutaku setsubi to kyojusha

    Energy Technology Data Exchange (ETDEWEB)

    Sawada, T. (Bunka Women' s University, Tokyo (Japan). Faculty of Home Economics)

    1991-10-05

    The modern residence is featured by the coexistence of the Chair-sitting style'' associated with the life style westernization, and the customary Floor-sitting style.'' This paper reports out of the Research on amenity in ways for living in houses'' the degree of owning furnitures and plan views of houses, space available for facilities and needs for facilities, and energy demand according to histories of dwelling. Trends of dwellers {prime} orientation according to their living histories show that people having an experience of living in foreign countries differ from farmer families in that the former families call for a house plan view to have a formal dining room'' with a second table or a family room'' for relaxation. Houses for groups more accustomed with the chair-sitting life style in the former families have two toilets at about 90%, while houses for farmer families at 30%. The degree of owning air conditioning and hot-water supply equipment in the former families is higher than in the farmer families. While the former families are typically electric power oriented, the farmer families are petroleum fuel oriented. 7 figs., 1 tab.

  8. Facility Management in Social Housing: integration of Services for Management of College Student Housing as an opportunity for Supply Development in Italy

    OpenAIRE

    Ernesto Casara; Alberto Fecchio

    2012-01-01

    College Student Residences are construction works for which the State emphasizes the social relevance and disposes facilities for private investors and public operators. Structured transactions by Property Funds are growing since 2007 in order to develop Student Housing. These activities have been changing the Italian Offer Scenery. The proposed model focuses on highquality residential offer and it integrates residence with supports and services in the Student Housing itself. The Provider is ...

  9. The Medical Cyclotron Facility in RMC, Parel, BARC

    International Nuclear Information System (INIS)

    Gopalakrishna, Arjun; Banerjee, Sharmila

    2017-01-01

    The Medical Cyclotron Facility in Radiation Medicine Centre (RMC) is the first one of its kind, installed in 2002. "1"8F based radiotracers are produced in this facility on a routine basis for Positron Emission Tomography (PET), of in-house patients, as well as for supply to other nuclear medicine centers in Mumbai as well as Pune. The facility consists of the following sub parts - Cyclotron and support equipment; Radiochemistry synthesis laboratory; Quality control (QC) laboratory

  10. Markets - the domestic house equipments; Marches - Installations interieures

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2005-03-01

    The firms 'PNG' (Professionnel Gaz Naturel) and 'PGP' (Professionnel Gaz Propane) have for January the same logo which constitutes the distinctive sign of the quality of their gas house equipments. A quality which has been confirmed by the audits of the 'PGP' made in 2004 in the framework of 'Qualigaz': the rate of anomalies and defects on the new propane equipments are about 5%. The persons responsible for these anomalies and defects have to take part in a follow-up and in pedagogic actions of the 'Comites de Concertation Locaux GPL' (CCLGPL) and of the 'Comites de Concertation Regionaux GPL' (CCRGPL). The 'CFPB' and its regional delegates have reinforced sensibly their technical information actions and multiplied transversal initiatives of knowledge contribution. All these tools are useful too for the promotion of the propane gas. Qualigaz has recently widen its activity in setting up a service sub-company 'Horizon Controle et Formation' which carries out various services to the demand of the building sector (gas diagnosis, asbestos, lead, termites...). The campaign 2004/2005 of prevention and information on the risk of carbon monoxide intoxication is going to end. The CFPB, which participates to this effort of prevention, has impelled to the national plan, the actions of the LPG trade. These ones have been relayed regionally, particularly in the CCLGPL, by the regional delegates of the CFBP and by the distribution firms. Moreover, specific actions have been conducted in the east region with the AFG. (O.M.)

  11. In-House Energy Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    DOE facilities are required to develop a documented energy management program encompassing owned and leased facilities and vehicles and equipment. The program includes an Energy Management Plan consistent with the requirements of the DOE ten-year In-House Energy Management Plan, an ECP specifying actions associated with the sudden disruption in the supply of critical fuels, an Energy Management Committee comprised of WIPP employees, and reporting criteria for quarterly energy consumption reporting to DOE Headquarters. The In-House Energy Management Program will include an implementation plan, a budget, and an interaction and coordination plan. The goal of this program is to sensitize the WIPP employees to the energy consequences of their actions and to motivate them to use energy more efficiently. To achieve this goal, the program is designed to both improve energy conservation at the WIPP through the direct efforts of every employee, and to encourage employees to take the lead in conserving energy at home, on the road, and in the community

  12. Damage caused to houses and equipment by underground nuclear explosions; Degats dus aux explosions nucleaires souterraines sur les habitations et les equipements

    Energy Technology Data Exchange (ETDEWEB)

    Delort, F; Guerrini, C [Commissariat a l' Energie Atomique, Bruyeres-le-Chatel (France). Centre d' Etudes

    1969-07-01

    A description is given of the damaged caused to various structures, buildings, houses, mechanical equipment and electrical equipment by underground nuclear explosions in granite. For each type of equipment or building are given the limiting distances for a given degree of damage. These distances have been related to a parameter characterizing the movement of the medium; it is thus possible to generalize the results obtained in granite, for different media. The problem of estimating the damage caused at a greater distance from the explosion is considered. (authors) [French] Les degats sur diverses structures, constructions, habitations, equipements mecaniques et materiels electriques provoques par des explosions nucleaires souterraines dans le granite sont decrits. On a indique pour chaque type de materiel ou de construction, les distances limites correspondant a un degre de gravite de dommage observe. Ces distances ont ete reliees a un parametre caracterisant le mouvement du milieu, permettant ainsi de generaliser les resultats obtenus dans le granite, a differents milieux. Le probleme de la prevision des degats en zone lointaine a ete aborde. (auteurs)

  13. Equipment experience in a radioactive LFCM [liquid-fed ceramic melter] vitrification facility

    International Nuclear Information System (INIS)

    Holton, L.K. Jr.; Dierks, R.D.; Sevigny, G.J.; Goles, R.W.; Surma, J.E.; Thomas, N.M.

    1986-11-01

    Since October 1984, the Pacific Northwest Laboratory (PNL) has operated a pilot-scale radioactive liquid-fed ceramic melter (RLFCM) vitrification process in shielded manipulator hot cells. This vitrification facility is being operated for the Department of Energy (DOE) to remotely test vitrification equipment components in a radioactive environment and to develop design and operation data that can be applied to production-scale projects. This paper summarizes equipment and process experience obtained from the operations of equipment systems for waste feeding, waste vitrification, canister filling, canister handling, and vitrification off-gas treatment

  14. Environmental Assessment for the Leasing of Facilities and Equipment to USEC Inc

    International Nuclear Information System (INIS)

    2002-01-01

    The U.S. Department of Energy (DOE) Oak Ridge Operations Office (DOE-ORO) has prepared this Environmental Assessment (EA) for the lease of facilities and equipment to USEC Inc. (USEC), which would be used in its Gas Centrifuge Research and Development (R and D) Project at the East Tennessee Technology Park (ETTP) [hereinafter referred to as the USEC EA]. The USEC EA analyzes the potential environmental impacts of DOE leasing facility K-101 and portions of K-1600, K-1220 and K-1037 at the ETTP to USEC for a minimum 3-year period, with additional option periods consistent with the Oak Ridge Accelerated Clean-up Plan (ACP) Agreement. In July 2002, USEC notified DOE that it intends to use certain leased equipment at an off-site facility at the Centrifuge Technology Center (CTC) on the Boeing Property. The purpose of the USEC Gas Centrifuge R and D Project is to develop an economically attractive gas centrifuge machine and process using DOE's centrifuge technology

  15. NORTH PORTAL - DOMESTIC COLD WATER CALCULATION - CHANGE HOUSE FACILITY No.5008

    International Nuclear Information System (INIS)

    S. Mastilovic

    2000-01-01

    The purpose of this design analysis and calculation is to determine the demand for domestic cold water and to size the supply main piping for the Change House Facility No.5008 in accordance with the Uniform Plumbing Code (Section 4.4.1) and US Department of Energy Order 6430.1A-1540 (Section 4.4.2)

  16. Preliminary analysis of West Valley Waste Removal System equipment development and mock demonstration facilities

    International Nuclear Information System (INIS)

    Janicek, G.P.

    1981-06-01

    This report defines seven areas requiring further investigation to develop and demonstrate a safe and viable West Valley Waste Removal System. These areas of endeavor are discussed in terms of their minimum facility requirements. It is concluded that utilizing separated specific facilities at different points in time is of a greater advantage than an exact duplication of the West Valley tanks. Savannah River Plant's full-scale, full-circle and half-circle tanks, and their twelfth scale model tank would all be useful to varying degrees but would require modifications. Hanford's proposed full-size mock tank would be useful, but is not seriously considered because its construction may not coincide with West Valley needs. Costs of modifying existing facilities and/or constructing new facilities are assessed in terms of their benefit to the equipment development and mock demonstration. Six facilities were identified for further analysis which would benefit development of waste removal equipment

  17. Classification of High-Rise Residential Building Facilities: A Descriptive Survey on 170 Housing Scheme in Klang Valley

    OpenAIRE

    Abd Wahab Siti Rashidah Hanum; Che Ani Adi Irfan; Sairi Ahmad; Mohd Tawil Norngainy; Abd Razak Mohd Zulhanif

    2016-01-01

    High-rise residential building is a type of housing that has multi-dwelling units built on the same land. This type of housing has become popular each year in urban area due to the increasing cost of land. There are several common facilities provided in high-rise residential building. For example playground, swimming pool, gymnasium, 24 hours security system such as CCTV, access card and so on. Thus, maintenance works of the common facilities must be well organised. The purpose of this paper ...

  18. Status of the nondestructive examination equipment for the fuels and materials examination facility

    International Nuclear Information System (INIS)

    Frandsen, G.B.

    1980-01-01

    The present status of Nondestructive Examination (NDE) Equipment proposed for the Fuels and Materials Examination Facility (FMEF) now under construction at the Hanford Engineering Development Laboratory is discussed. Items discussed include the NDE cell receiving machine, the dismantling machine, the standard examination stage, profilometry, eddy current, wire wrap removal machine, surface examination, gamma scan and general NDE equipment

  19. Fine-scale geographic variations of inflammatory bowel disease in France: correlation with socioeconomic and house equipment variables.

    Science.gov (United States)

    Nerich, Virginie; Monnet, Elisabeth; Weill, Alain; Vallier, Nathalie; Vanbockstael, Vincent; Auleley, Guy-Robert; Balaire, Corine; Dubost, Patrick; Rican, Stéphane; Allemand, Hubert; Carbonnel, Franck

    2010-05-01

    In a previous study we found a north-south gradient for Crohn's disease (CD) incidence in France. The aim of the present study was to determine if socioeconomic factors may influence the geographic distribution of CD and ulcerative colitis (UC) in France. Using the national health insurance databases, incidence rates of CD and UC were estimated for each of 341 metropolitan "job areas" in 2000-2002. Relationships between incidence rates and relevant contextual variables from the 1999 French census were tested for significance using a Poisson regression. Mapping of smoothed relative risks (sRR) for CD and UC at the scale of job areas, using a Bayesian approach and adjusting for significant contextual variables, was carried out in order to search for geographic variations. CD incidence rates were negatively related to the percentage of farmers and to the percentage of housing with bathroom and toilets and positively related to the unemployment rate and to the percentage of households below the poverty threshold. Mapping of sRR for CD showed a clear north-south gradient, which was slightly improved after including the percentage of farmers and the percentage of housing with toilets. In UC we found no significant correlation between either incidence and socioeconomic variables or incidence and house equipment variables, and there was no north-south gradient. However, there was a positive and significant correlation between CD and UC incidence. The present study shows that geographic risk factors of CD in France are northern latitude, nonrural areas, and areas with poor sanitary house equipment. Among these factors the most important is northern latitude.

  20. National Ignition Facility subsystem design requirements optics assembly building (OAB) SSDR 1.2.2.3

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirement (SSDR) document establishes the performance, design, and verification requirements 'for the conventional building systems and subsystems of the Optics Assembly Building (OAB). These building system requirements are associated with housing and supporting the operational flow of personnel and materials throughout the OAB for preparing and repairing optical and mechanical components used in the National Ignition Facility (NIF) Laser and Target Building (LTAB). This SSDR addresses the following subsystems associated with the OAB: * Structural systems for the building spaces and operational-support equipment and building- support equipment. * Architectural building features associated with housing the space, operational cleanliness, and functional operation of the facility. * Heating, Ventilating, and Air Conditioning (HVAC) systems for maintaining a clean and thermally stable ambient environment within the facility. * Plumbing systems that provide potable water and sanitary facilities for the occupants and stormwater drainage for transporting rainwater. * Fire Protection systems that guard against fire damage to the facility and its contents. * Material handling equipment for transferring optical assemblies and other materials within building areas and to the LTAB. * Mechanical process piping systems for liquids and gases that provide cooling, cleaning, and other service to optical and mechanical components. * Electrical power and grounding systems that provide service to the building and equipment, including lighting distribution and communications systems for the facilities. * Instrumentation and control systems that ensure the safe operation of conventional facilities systems, such as those listed above. Generic design criteria, such as siting data, seismic requirements, utility availability, and other information that contributes to the OAB design, are not addressed in this document

  1. 75 FR 54025 - Vessel and Facility Response Plans for Oil: 2003 Removal Equipment Requirements and Alternative...

    Science.gov (United States)

    2010-09-03

    ... responders for each vessel or facility with appropriate equipment and resources located in each zone of operation; specific lists of equipment that the resource providers will make available in case of an...

  2. Design guides for radioactive-material-handling facilities and equipment

    International Nuclear Information System (INIS)

    Doman, D.R.; Barker, R.E.

    1980-01-01

    Fourteen key areas relating to facilities and equipment for handling radioactive materials involved in examination, reprocessing, fusion fuel handling and remote maintenance have been defined and writing groups established to prepare design guides for each areas. The guides will give guidance applicable to design, construction, operation, maintenance and safety, together with examples and checklists. Each guide will be reviewed by an independent review group. The guides are expected to be compiled and published as a single document

  3. The gravitational plant physiology facility-Description of equipment developed for biological research in spacelab

    Science.gov (United States)

    Heathcote, D. G.; Chapman, D. K.; Brown, A. H.; Lewis, R. F.

    1994-01-01

    In January 1992, the NASA Suttle mission STS 42 carried a facility designed to perform experiments on plant gravi- and photo-tropic responses. This equipment, the Gravitational Plant Physiology Facility (GPPF) was made up of a number of interconnected units mounted within a Spacelab double rack. The details of these units and the plant growth containers designed for use in GPPF are described. The equipment functioned well during the mission and returned a substantial body of time-lapse video data on plant responses to tropistic stimuli under conditions of orbital microgravity. GPPF is maintained by NASA Ames Research Center, and is flight qualifiable for future spacelab missions.

  4. The influence of facility and home pen design on the welfare of the laboratory-housed dog.

    Science.gov (United States)

    Scullion Hall, Laura E M; Robinson, Sally; Finch, John; Buchanan-Smith, Hannah M

    We have an ethical and scientific obligation to Refine all aspects of the life of the laboratory-housed dog. Across industry there are many differences amongst facilities, home pen design and husbandry, as well as differences in features of the dogs such as strain, sex and scientific protocols. Understanding how these influence welfare, and hence scientific output is therefore critical. A significant proportion of dogs' lives are spent in the home pen and as such, the design can have a considerable impact on welfare. Although best practice guidelines exist, there is a paucity of empirical evidence to support the recommended Refinements and uptake varies across industry. In this study, we examine the effect of modern and traditional home pen design, overall facility design, husbandry, history of regulated procedures, strain and sex on welfare-indicating behaviours and mechanical pressure threshold. Six groups of dogs from two facilities (total n=46) were observed in the home pen and tested for mechanical pressure threshold. Dogs which were housed in a purpose-built modern facility or in a modern design home pen showed the fewest behavioural indicators of negative welfare (such as alert or pacing behaviours) and more indicators of positive welfare (such as resting) compared to those in a traditional home pen design or traditional facility. Welfare indicating behaviours did not vary consistently with strain, but male dogs showed more negative welfare indicating behaviours and had greater variation in these behaviours than females. Our findings showed more positive welfare indicating behaviours in dogs with higher mechanical pressure thresholds. We conclude that factors relating to the design of home pens and implementation of Refinements at the facility level have a significant positive impact on the welfare of laboratory-housed dogs, with a potential concomitant impact on scientific endpoints. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights

  5. Conventional Gymnasium vs. Geodesic Field House. A Comparative Study of High School Physical Education and Assembly Facilities.

    Science.gov (United States)

    Educational Facilities Labs., Inc., New York, NY.

    A description is presented of the design features of a high school's geodesic dome field house. Following consideration of various design features and criteria for the physical education facility, a comprehensive analysis is given of comparative costs of a geodesic dome field house and conventional gymnasium. On the basis of the study it would…

  6. Classification of High-Rise Residential Building Facilities: A Descriptive Survey on 170 Housing Scheme in Klang Valley

    Directory of Open Access Journals (Sweden)

    Abd Wahab Siti Rashidah Hanum

    2016-01-01

    Full Text Available High-rise residential building is a type of housing that has multi-dwelling units built on the same land. This type of housing has become popular each year in urban area due to the increasing cost of land. There are several common facilities provided in high-rise residential building. For example playground, swimming pool, gymnasium, 24 hours security system such as CCTV, access card and so on. Thus, maintenance works of the common facilities must be well organised. The purpose of this paper is to identify the classification of facilities provided at high rise residential building. The survey was done on 170 high-rise residential schemes by using stratified random sampling technique. The scope of this research is within Klang Valley area. This area is rapidly developed with high-rise residential building. The objective of this survey is to list down all the facilities provided in each sample of the schemes. The result, there are nine classification of facilities provided for high-rise residential building.

  7. Acoustic Measurements in Opera Houses: Comparison Between Different Techniques and Equipment

    Science.gov (United States)

    FAUSTI, P.; FARINA, A.

    2000-04-01

    In room acoustics, many objective parameters to quantify subjective impressions have been introduced. These quantities can be measured by using a wide variety of powerful tools and equipment. The results can be influenced by the measurement techniques and instruments used. Furthermore, the results also depend on the measurement positions and on the condition of the hall (full, empty, etc.). The aim of this work is to define a tightly standardized measurement procedure for the collection of a complete objective description of an opera house's acoustics. In this paper some of the results obtained by the authors after measurements made in three different halls are presented. Comparisons were made both between different hardware and software tools (real-time analyzer, DAT, PC-board, source, microphones, post-processing software) and between different measurement methods (interrupted stationary noise, true-impulse, pseudo-random white noise with impulse-response doconvolution, sine sweep) as well as between different positions in the halls, with and without the presence of musicians and audience. The results have shown that the differences obtained when using different measurement techniques and equipment are not of significant importance. The only effective differences were found regarding the recording techniques, as the monaural measurements give appreciably different results from the average of left and right channel of binaural measurements. Slightly different results were alsofound between true impulsive sources (pistol shots, balloons) and omni-directional (dodecahedral) loudspeakers. Attention must be paid to the signal-to-noise ratio, as this can influence the correct calculation of some acoustical parameters. Some differences, not as great as expected, were found in the results with and without the musicians in the orchestra shell and with and without the audience in the hall. This is probably due to the high sound absorption that is typical in Italian opera

  8. Seismic qualification of equipment for the TA-55 Plutonium Processing Facility

    International Nuclear Information System (INIS)

    Pellette, P.R.; Endebrock, E.G.; Giles, P.M.; Shaw, R.H.

    1977-04-01

    The techniques employed by the Los Alamos Scientific Laboratory (LASL) for the seismic qualification of internal equipment for the TA-55 Plutonium Facility are discussed. The structural analysis of the plutonium building and critical associated structures was performed by the Architect-Engineer (A-E), and the calculations were checked by LASL. The specifications and procedures used by LASL produced dramatic improvement in the responses by qualified vendors to the seismic requirements. There was an increase from about a 20% bid ratio to greater than 90% because prospective vendors could be competitive without having had previous seismic experience with their equipment. The equipment seismic qualification for TA-55 is in compliance with the Code of Federal Regulations, Nuclear Regulatory Commission (NRC) Guides, Energy Research and Development Administration (ERDA) Manual Chapters and Appendices, and Institute of Electrical and Electronic Engineers (IEEE) Standard 344

  9. Listeria monocytogenes contamination of the environment and surfaces of the equipment in the meat processing facilities in republic of Macedonia

    OpenAIRE

    Dean Jankuloski; Pavle Sekulovski; Risto Prodanov; Zehra Hajrulai Musliu; Biljana Stojanovska Dimzovska

    2007-01-01

    Listeria monocytogenes contamination of the environment and surfaces of the equipment was examined in seven meat processing facilities. Up to date prevalence of this foodborn pathogen in meat processing facilities facilities in Republic of Macedonia was unknown. Biofilms are composed from food spoilage microorganisms and food born pathogens. They are located on the surfaces of the equipment that come in contact with food and in facilities environment. Microorganisms in biofilm presenting micr...

  10. On The Issue Of The Nature And Evaluation Of The Equipment And Facilities During The Accreditation Of Schools Of Higher Education

    OpenAIRE

    Ivan Zhelev

    2012-01-01

    The provision of high quality education in higher schools is connected with the need for skilled and habilitated academic staff and the existence of modern equipment and facilities. In the article there are examined some theoretical and applied aspects of the equipment and facilities of the higher schools and on that basis there is outlined a methodical approach for their evaluation during accreditation. There are clarifie d the nature, elements and scope of the term „equipment and facilities...

  11. MGR COMPLIANCE PROGRAM GUIDANCE PACKAGE FOR RADIATION PROTECTION EQUIPMENT, INSTRUMENTATION, AND FACILITIES

    International Nuclear Information System (INIS)

    2000-01-01

    This Compliance Program Guidance Package identifies the regulatory guidance and industry codes and standards addressing radiation protection equipment, instrumentation, and support facilities considered to be appropriate for radiation protection at the Monitored Geologic Repository (MGR). Included are considerations relevant to radiation monitoring instruments, calibration, contamination control and decontamination, respiratory protection equipment, and general radiation protection facilities. The scope of this Guidance Package does not include design guidance relevant to criticality monitoring, area radiation monitoring, effluent monitoring, and airborne radioactivity monitoring systems since they are considered to be the topics of specific design and construction requirements (i.e., ''fixed'' or ''built-in'' systems). This Guidance Package does not address radiation protection design issues; it addresses the selection and calibration of radiation monitoring instrumentation to the extent that the guidance is relevant to the operational radiation protection program. Radon and radon progeny monitoring instrumentation is not included in the Guidance Package since such naturally occurring radioactive materials do not fall within the NRC's jurisdiction at the MGR

  12. Department of Defense In-House RDT&E Activities. FY2000 Management Analysis Report

    Science.gov (United States)

    2000-01-01

    meet all 1998 OSHA safety codes. Current capabilities housed within this laboratory facility include Nanotechnology (Quantum Dots), IR Technology (QWIPs...Some unique programs involve (a) bioengineering technology and nanotechnology that are breaking new ground to provide the technology for new advanced...development, test and evaluation of seawater desalination equipment and expeditionary water treatment devices for production of potable water

  13. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I ampersand C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified to include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility

  14. Tech House

    Science.gov (United States)

    1978-01-01

    The members of the Swain family- Dr. Charles "Bill" Swain, wife Elaine, daughter Carol, 17, son "Chuck", 12, and dog Susie have an interesting assignment. They are active participants in an important NASA research program involving the application of space-age technology to home construction. b' Transplanted Floridians, the Swains now reside in NASA's Tech House, loatedat Langley Research Center, Hampton, Virginia. Their job is to use and help evaluate the variety of advanced technology systems in Tech House. A contemporary three-bedroom home, Tech House incorporates NASA technology, the latest commercial building techniques and other innovations, all designed to reduce energy and water consumption and to provide new levels of comfort, convenience, security and fire safety. Tech House equipment performed well in initial tests, but a house is not a home until it has people. That's where the Swains come in. NASA wants to see how the various systems work under actual living conditions, to confirm the effectiveness of the innovations or to determine necessary modifications for improvement. The Swains are occupying the house for a year, during which NASA engineers are computer monitoring the equipment and assembling a record of day-to-day performance. . Tech House is a laboratory rather than a mass production prototype, but its many benefits may influence home design and construction. In a period of sharply rising utility costs, widespread adoption of Tech House features could provide large-scale savings to homeowners and potentially enormous national benefit in resources conservation. Most innovations are aerospace spinoffs: Some of the equipment is now commercially available; other systems are expected to be in production within a few years. Around 1980, a Tech House-type of home could be built for $45-50,000 (1 976 dollars). It is estimated that the homeowner would save well over $20,000 (again 1976 dollars) in utility costs over the average mortgage span of 20 years.

  15. The relative patient costs and availability of dental services, materials and equipment in public oral care facilities in Tanzania.

    Science.gov (United States)

    Nyamuryekung'e, Kasusu K; Lahti, Satu M; Tuominen, Risto J

    2015-07-01

    Patient charges and availability of dental services influence utilization of dental services. There is little available information on the cost of dental services and availability of materials and equipment in public dental facilities in Africa. This study aimed to determine the relative cost and availability of dental services, materials and equipment in public oral care facilities in Tanzania. The local factors affecting availability were also studied. A survey of all district and regional dental clinics in selected regions was conducted in 2014. A total of 28/30 facilities participated in the study. A structured interview was undertaken amongst practitioners and clinic managers within the facilities. Daily resources for consumption (DRC) were used for estimation of patients' relative cost. DRC are the quantified average financial resources required for an adult Tanzanian's overall consumption per day. Tooth extractions were found to cost four times the DRC whereas restorations were 9-10 times the DRC. Studied facilities provided tooth extractions (100%), scaling (86%), fillings (79%), root canal treatment (46%) and fabrication of removable partial dentures (32%). The ratio of tooth fillings to extractions in the facilities was 1:16. Less than 50% of the facilities had any of the investigated dental materials consistently available throughout the year, and just three facilities had all the investigated equipment functional and in use. Dental materials and equipment availability, skills of the practitioners and the cost of services all play major roles in provision and utilization of comprehensive oral care. These factors are likely to be interlinked and should be taken into consideration when studying any of the factors individually.

  16. 77 FR 38077 - Notice of Intent To Prepare an Environmental Impact Statement on a Proposed Boat-House Facility...

    Science.gov (United States)

    2012-06-26

    ... DEPARTMENT OF THE INTERIOR National Park Service [NPS-NCR-GWMP-1202-9483: 3310-0250-471] Notice of Intent To Prepare an Environmental Impact Statement on a Proposed Boat-House Facility for Non-Motorized... identify a preferred site for construction of an environmentally sustainable facility for non-motorized...

  17. National Ignition Facility subsystem design requirements laser and target area building (LTAB) SSDR 1.2.2.1

    International Nuclear Information System (INIS)

    Kempel, P.; Hands, J.

    1996-01-01

    This Subsystem Design Requirements (SSDR) document establishes the performance, design, and verification requirements for the conventional building systems and subsystems of the Laser and Target Area Building (LTAB), including those that house and support the operation of high-energy laser equipment and the operational flow of personnel and materials throughout the facility. This SSDR addresses the following subsystems associated with the LTAB: Building structural systems for the Target Bay, Switchyards, Diagnostic Building, Decontamination Area, Laser Bays, Capacitor Bays and Operations Support Area, and the necessary space associated with building-support equipment; Architectural building features associated with housing the space and with the operational cleanliness of the functional operation of the facilities; Heating, Ventilating, and Air Conditioning (HVAC) systems for maintaining a clean and thermally stable ambient environment within the facilities; Plumbing systems that provide potable water and sanitary facilities for the occupants, plus stormwater drainage for transporting rainwater; Fire Protection systems that guard against fire damage to the facilities and their contents; Material handling systems for transporting personnel and heavy materials within the building areas; Mechanical process piping systems for liquids and gases that provide cooling and other service to experimental laser equipment and components; Electrical power and grounding systems that provide service and standby power to building and experimental equipment, including lighting distribution and communications systems for the facilities; Instrumentation and control systems that ensure the safe operation of conventional facilities systems, such as those listed above. Detailed requirements for building subsystems that are not addressed in this document (such as specific sizes, locations, or capacities) are included in detail-level NIP Project Interface Control Documents (ICDS)

  18. Development and oviposition preference of house flies and stable flies (Diptera: Muscidae) in six substrates from Florida equine facilities

    Science.gov (United States)

    House flies, Musca domestica L., and stable flies, Stomoxys calcitrans (L.), (Diptera: Muscidae), common pests on equine facilities, were studied in the laboratory to determine their oviposition preferences and larval development on six substrates commonly found on equine facilities. The substrates...

  19. Design Methodology of Process Layout considering Various Equipment Types for Large scale Pyro processing Facility

    International Nuclear Information System (INIS)

    Yu, Seung Nam; Lee, Jong Kwang; Lee, Hyo Jik

    2016-01-01

    At present, each item of process equipment required for integrated processing is being examined, based on experience acquired during the Pyropocess Integrated Inactive Demonstration Facility (PRIDE) project, and considering the requirements and desired performance enhancement of KAPF as a new facility beyond PRIDE. Essentially, KAPF will be required to handle hazardous materials such as spent nuclear fuel, which must be processed in an isolated and shielded area separate from the operator location. Moreover, an inert-gas atmosphere must be maintained, because of the radiation and deliquescence of the materials. KAPF must also achieve the goal of significantly increased yearly production beyond that of the previous facility; therefore, several parts of the production line must be automated. This article presents the method considered for the conceptual design of both the production line and the overall layout of the KAPF process equipment. This study has proposed a design methodology that can be utilized as a preliminary step for the design of a hot-cell-type, large-scale facility, in which the various types of processing equipment operated by the remote handling system are integrated. The proposed methodology applies to part of the overall design procedure and contains various weaknesses. However, if the designer is required to maximize the efficiency of the installed material-handling system while considering operation restrictions and maintenance conditions, this kind of design process can accommodate the essential components that must be employed simultaneously in a general hot-cell system

  20. Process pump operating problems and equipment failures, F-Canyon Reprocessing Facility, Savannah River Plant

    International Nuclear Information System (INIS)

    Durant, W.S.; Starks, J.B.; Galloway, W.D.

    1987-02-01

    A compilation of operating problems and equipment failures associated with the process pumps in the Savannah River Plant F-Canyon Fuel Reprocessing Facility is presented. These data have been collected over the 30-year operation of the facility. An analysis of the failure rates of the pumps is also presented. A brief description of the pumps and the data bank from which the information was sorted is also included

  1. Materials division facilities and equipment

    International Nuclear Information System (INIS)

    Biest, O. v.d.

    1984-01-01

    The research activities of the Division at the Petten Establishment have the aims of characterising the properties of high temperature materials in industrial process environments and of understanding the structures involved in order to gain an insight into behavioural mechanisms. Metallic materials fall within the scope of the programme; the activities are, at present, almost entirely concerned with austenitic steels and nickel based alloys. Starting in 1984, advanced ceramic materials will be studied as well. The equipment available permits the study of mechanical properties in controlled gaseous environments, of the rates and mechanisms of corrosive reactions between materials and those environments, and of the surface and bulk structures by advanced physical techniques. Special preparation and treatment techniques are available. The Division has developed a Data Bank on high temperature alloys. It also operates an information Centre, the activities of which include the organisation of scientific meetings, the commissioning of ''state of the art'' studies on topics in the field of high temperature materials and their applications and the development of a inventory of current research activities in the field in Europe. This booklet is intended to present the facilities and services of the Division to the organizations which are interested in its programmes of work

  2. Facility-wide synchronization of standard FAIR equipment controllers

    International Nuclear Information System (INIS)

    Rauch, S.; Terpstra, W.; Panschow, W.; Thieme, M.; Prados, C.; Zweig, M.; Kreider, M.; Beck, D.; Bär, R.

    2012-01-01

    The standard equipment controller under development for the new FAIR accelerator facility is the Scalable Control Unit (SCU). It is designed to synchronize and control the actions of up to 12 purpose-built slave cards, connected in a proprietary crate by a parallel backplane. Inter-crate coordination and facility-wide synchronization are a core FAIR requirement and thus precise timing of SCU slave actions is of vital importance. The SCU consists primarily of two components, an x86 COM Express daughter board and a carrier board with an Altera Arria II GX FPGA, interconnected by PCI Express. The x86 receives configuration and set values with which it programs the real-time event-condition-action (ECA) unit in the FPGA. The ECA unit receives event messages via the timing network, which also synchronizes the clocks of all SCUs in the facility using White Rabbit. Matching events trigger actions on the SCU slave cards such as: ramping magnets, triggering kickers, etc. Timing requirements differ depending on the action taken. For softer real-time actions, an interrupt can be generated for complex processing on the x86. Alternatively, the FPGA can directly fire a pulse out a LEMO output or an immediate SCU bus operation. The delay and synchronization achievable in each case differs and this paper examines the timing performance of each to determine which approach is appropriate for the required actions. (author)

  3. 10 CFR Appendix N to Part 110 - Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment Under NRC's...

    Science.gov (United States)

    2010-01-01

    ..., Plants and Equipment Under NRC's Export Licensing Authority N Appendix N to Part 110 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) EXPORT AND IMPORT OF NUCLEAR EQUIPMENT AND MATERIAL Pt. 110, App. N Appendix N to Part 110—Illustrative List of Lithium Isotope Separation Facilities, Plants and Equipment...

  4. 76 FR 40741 - Federal Housing Administration (FHA) Mortgage Insurance Premiums for Multifamily Housing Programs...

    Science.gov (United States)

    2011-07-11

    ... Administration (FHA) Mortgage Insurance Premiums for Multifamily Housing Programs, Health Care Facilities and... mortgage insurance premiums (MIPs) for FHA Multifamily Housing, Health Care Facilities, and Hospital... mortgage insurance regulation at 24 CFR 207.254 provides as follows: Notice of future premium changes will...

  5. The Relative Patient Costs and Availability of Dental Services, Materials and Equipment in Public Oral Care Facilities in Tanzania.

    OpenAIRE

    Nyamuryekung'e, Kasusu K; Lahti, Satu M; Tuominen, Risto J

    2015-01-01

    Background Patient charges and availability of dental services influence utilization of dental services. There is little available information on the cost of dental services and availability of materials and equipment in public dental facilities in Africa. This study aimed to determine the relative cost and availability of dental services, materials and equipment in public oral care facilities in Tanzania. The local factors affecting availability were also studied. Methods A survey of all dis...

  6. RISK ASSESSMENT BY STRUCTURAL ANALYSIS AND VIBRATION MEASUREMENT EQUIPMENT OPERATING AT OIL FACILITIES

    OpenAIRE

    Marius STAN

    2013-01-01

    Vibration analysis applications in operation is one of the diagnostic methods ofoperation of the facility. Analysis of these types of failures indicated the existence of specificfeatures prints and related equipment vibration spectra. Modeling and identification of theseparticular aspects in the spectrum of vibration machines help to control the operation of oilfacilities built safely.

  7. System for keeping atmospheric pressure in nuclear facility and its peripheral equipments

    International Nuclear Information System (INIS)

    Matsumoto, Hatsuo

    1993-02-01

    The design to keep radioactive materials in the facility and not to make them spread inside the facility and into the environments is an essential issue in the construction of nuclear facilities. One reason of the contamination is due to the diffusion with air flow, therefore, negative pressure for the ambients has been utilized to keep gaseous radioactivities inside the facility of interest. The pressure difference is not so large, though, the atmospheric pressure level of the contaminated and possibly contaminated areas are always kept to be lower than those of the ambient one to prevent the dissemination of radioactivity from the defined area. The technique using negative pressure, at present, is employed widely in nuclear facilities, and the basic system is the same as that of JRR-1 built as the first nuclear facility in Japan. In the present work, the conventional system with negative pressure was reexamined on the sate-of-art of the regulations for the nuclear facilities, and consequently some shortages of the system has been found. Thus, an advanced system with an excellent performance keeping the negative pressure has been developed to cover the shortage. In this report, the new system is introduced with a couple of comments, acquired from the author's experience, to the design and the maintenance of the composite equipments of the system. (author)

  8. Dance Facilities.

    Science.gov (United States)

    Ashton, Dudley, Ed.; Irey, Charlotte, Ed.

    This booklet represents an effort to assist teachers and administrators in the professional planning of dance facilities and equipment. Three chapters present the history of dance facilities, provide recommended dance facilities and equipment, and offer some adaptations of dance facilities and equipment, for elementary, secondary and college level…

  9. Refurbishment of an Analytical Laboratory Hot Cell Facility

    International Nuclear Information System (INIS)

    Rosenberg, K.; Henslee, S.P.; Michelbacher, J.A.; Coleman, R.M.

    1997-01-01

    An Analytical Laboratory Hot Cell (ALHC) Facility at Argonne National Laboratory-West (ANL-W) was in service for nearly thirty years. In order to comply with DOE regulations governing such facilities and meet ANL-W programmatic requirements, a major refurbishment effort was undertaken. All penetrations within the facility were sealed; the ventilation system was redesigned, upgraded and replaced; the manipulators were replaced; the hot cell windows were removed, refurbished, and reinstalled; all hot cell utilities were replaced; a lead-shielded glovebox housing an Inductively Coupled Plasma - Atomic Emission Spectrometer (ICP-AES) System was interfaced with the hot cells, and a new CO2 fire suppression system and other ALHC support equipment were installed

  10. Operating experience of steam generator test facility

    International Nuclear Information System (INIS)

    Sureshkumar, V.A.; Madhusoodhanan, G.; Noushad, I.B.; Ellappan, T.R.; Nashine, B.K.; Sylvia, J.I.; Rajan, K.K.; Kalyanasundaram, P.; Vaidyanathan, G.

    2006-01-01

    Steam Generator (SG) is the vital component of a Fast Reactor. It houses both water at high pressure and sodium at low pressure separated by a tube wall. Any damage to this barrier initiates sodium water reaction that could badly affect the plant availability. Steam Generator Test Facility (SGTF) has been set up in Indira Gandhi Centre for Atomic Research (IGCAR) to test sodium heated once through steam generator of 19 tubes similar to the PFBR SG dimension and operating conditions. The facility is also planned as a test bed to assess improved designs of the auxiliary equipments used in Fast Breeder Reactors (FBR). The maximum power of the facility is 5.7 MWt. This rating is arrived at based on techno economic consideration. This paper covers the performance of various equipments in the system such as Electro magnetic pumps, Centrifugal sodium pump, in-sodium hydrogen meters, immersion heaters, and instrumentation and control systems. Experience in the system operation, minor modifications, overall safety performance, and highlights of the experiments carried out etc. are also brought out. (author)

  11. 77 FR 21580 - Changes in Certain Multifamily Housing and Health Care Facility Mortgage Insurance Premiums for...

    Science.gov (United States)

    2012-04-10

    ... Multifamily Housing and Health Care Facility Mortgage Insurance Premiums for Fiscal Year (FY) 2013 AGENCY...: In accordance with HUD regulations, this notice announces changes of the mortgage insurance premiums... mortgage. The mortgage insurance premiums to be in effect for FHA firm commitments issued or reissued in FY...

  12. RISK ASSESSMENT BY STRUCTURAL ANALYSIS AND VIBRATION MEASUREMENT EQUIPMENT OPERATING AT OIL FACILITIES

    Directory of Open Access Journals (Sweden)

    Marius STAN

    2013-05-01

    Full Text Available Vibration analysis applications in operation is one of the diagnostic methods ofoperation of the facility. Analysis of these types of failures indicated the existence of specificfeatures prints and related equipment vibration spectra. Modeling and identification of theseparticular aspects in the spectrum of vibration machines help to control the operation of oilfacilities built safely.

  13. Retrofit of waste-to-energy facilities equipped with electrostatic precipitators. Volume III: Test protocol

    Energy Technology Data Exchange (ETDEWEB)

    Rigo, H.G. [Rigo & Rigo Associates, Inc., Berea, OH (US); Chandler, A.J. [A.J. Chandler & Associates, Inc., Toronto, Ontario (Canada)

    1996-04-01

    The American Society of Mechanical Engineers' [ASME] Center for Research and Technology Development [CRTD] has been awarded a subcontract by the National Renewable Energy Laboratory [NREL] to demonstrate the technical performance and viability of flue gas temperature control in combination with dry acid gas reagent and activated carbon injection at an existing electrostatic precipitator [ESP] equipped municipal waste combustor [MWC]. The objective of this proof-of-concept demonstration test is to economically and reliably meet 40 CFR 60 Subpart Cb Emissions Guidelines for MWC's at existing ESP equipped facilities. The effort is being directed by a Subcommittee of tile ASME Research Committee on Industrial and Municipal Wastes [RCIMW] chaired by Dave Hoecke. Mr. Greg Barthold of ASME/CRTD is the Project Manager. ASME/CRTD contracted with Rigo & Rigo Associates, Inc. in cooperation with A.J. Chandler & Associates, Ltd. to be the Principal Investigator for the project and manage the day-t o-day aspects of the program, conduct the testing reduce and interpret the data and prepare the report. Testing will be conducted at the 2 by 210 TPD, ESP equipped MWC at the Davis County Resource Recovery Facility in Layton, Utah. The test plan calls for duplicate metals (Cd, Pb and Hg), dioxin and acid gas runs.

  14. Biosafety Procedure for Safe Handling of Genetically Modified Plant Materials in Bio Design Facility

    International Nuclear Information System (INIS)

    Zaiton Ahmad; Shuhaimi Shamsudin; Mohamed Najli Mohamed Yasin; Affrida Abu Hassan; Mohd Zaid Hassan; Rusli Ibrahim

    2015-01-01

    Bio Design Facility is the specifically designed glass house for propagation, screening and analysis of high quality plant varieties developed through biotechnology or a combination of nuclear technology and biotechnology. High quality plant varieties especially genetically modified plants (GMO) require a special glass house facility for propagation and screening to isolate them from cross-pollinating with wild type varieties in surrounding ecosystem, and for carrying out evaluation of possible risks of the plants to human, animal and environment before they are proven safe for field trials or commercial release. This facility which was developed under the Ninth Malaysia Plan is classified as the Plant Containment Level 2 and is compliance with the bio safety regulations and guidance for the safe release of GMO according to Malaysian Bio safety Act 2007. Bio Design Facility is fully operational since 2010 and in 2012, it has also been certified as the glass house for post-entry quarantine by The Department of Agriculture. This paper summarizes the bio safety procedure for a safe, controlled and contained growing and evaluation of GMO in Bio Design Facility. This procedure covers the physical (containment and equipment's) and operational (including responsibility, code of practice, growing, decontamination and disposal of plant materials, emergency and contingency plan) aspects of the facility. (author)

  15. Advanced facilities for radiochemistry at Harwell

    International Nuclear Information System (INIS)

    1985-01-01

    The leaflets in this folder describe the latest addition to Harwell's active handling capability. This is a high level alpha, beta, gamma facility designed specifically for undertaking chemical research and development work. It is based on using high integrity containment boxes which are housed in concrete shielded enclosures. The active boxes can be removed and transferred remotely to a support area where they, and any associated equipment, can be decontaminated and serviced whilst a new fully commissioned box can be readily brought into service. The facility fulfills the principle of ALARA and is sufficiently flexible to accommodate a wide range of active handling requirements. It is supported by a suite of medium active handling cells, radiochemical laboratories and, as necessary, facilities of other scientific and engineering disciplines. The leaflets are: report on conceptual aspects; Techsheet 'Remote handling facility - Salient information'; Techsheet 'Project capabilities'; and 4 sheets of diagrams showing details of the facility. (U.K.)

  16. Remote handling facility and equipment used for space truss assembly

    International Nuclear Information System (INIS)

    Burgess, T.W.

    1987-01-01

    The ACCESS truss remote handling experiments were performed at Oak Ridge National Laboratory's (ORNL's) Remote Operation and Maintenance Demonstration (ROMD) facility. The ROMD facility has been developed by the US Department of Energy's (DOE's) Consolidated Fuel Reprocessing Program to develop and demonstrate remote maintenance techniques for advanced nuclear fuel reprocessing equipment and other programs of national interest. The facility is a large-volume, high-bay area that encloses a complete, technologically advanced remote maintenance system that first began operation in FY 1982. The maintenance system consists of a full complement of teleoperated manipulators, manipulator transport systems, and overhead hoists that provide the capability of performing a large variety of remote handling tasks. This system has been used to demonstrate remote manipulation techniques for the DOE, the Power Reactor and Nuclear Fuel Development Corporation (PNC) of Japan, and the US Navy in addition to the National Aeronautics and Space Administration. ACCESS truss remote assembly was performed in the ROMD facility using the Central Research Laboratory's (CRL) model M-2 servomanipulator. The model M-2 is a dual-arm, bilateral force-reflecting, master/slave servomanipulator which was jointly developed by CRL and ORNL and represents the state of the art in teleoperated manipulators commercially available in the United States today. The model M-2 servomanipulator incorporates a distributed, microprocessor-based digital control system and was the first successful implementation of an entirely digitally controlled servomanipulator. The system has been in operation since FY 1983. 3 refs., 2 figs

  17. Investigations of Intelligent Solar Heating Systems for Single Family House

    DEFF Research Database (Denmark)

    Andersen, Elsa; Chen, Ziqian; Fan, Jianhua

    2014-01-01

    Three differently designed intelligent solar heating systems are investigated experimentally in a test facility. The systems provide all the needed yearly heating demand in single family houses. The systems are based on highly stratified tanks with variable auxiliary heated volumes. The tank is a......, the control strategy of intelligent solar heating systems is investigated and the yearly auxiliary energy use of the systems and the electricity price for supplying the consumers with domestic hot water and space heating are calculated....... systems.The system will be equipped with an intelligent control system where the control of the electrical heating element(s)/heat pump is based on forecasts of the variable electricity price, the heating demand and the solar energy production.By means of numerical models of the systems made in Trnsys......Three differently designed intelligent solar heating systems are investigated experimentally in a test facility. The systems provide all the needed yearly heating demand in single family houses. The systems are based on highly stratified tanks with variable auxiliary heated volumes. The tank...

  18. Health physics and quality control management of a cyclotron-based PET facility

    International Nuclear Information System (INIS)

    Jerabek, P.A.

    1995-01-01

    This paper provides an overview of the operation and management of a Positron Emission Tomography (PET) facility at the University of Texas. The facility components are discussed from an operations perspective with an emphasis on devices, and on practices and procedures which are implemented to ensure that personnel exposures are as low as reasonably achievable. The cyclotron-based PET facility uses in-house production of PET radioisotopes for preparation of radiopharmaceuticals. A combination of specially designed cyclotron equipped devices, radiopharmaceutical preparation devices, and shielded devices along with health physics practices have helped to make PET operations become routine

  19. Evaluation of protection factor of respiratory protective equipment using indigenously developed protection factor test facility

    International Nuclear Information System (INIS)

    Patkulkar, D.S.; Ganesh, G.; Tripathi, R.M.

    2018-01-01

    Assigned protection factor (APF) is an indicator representing effectiveness of a respirator and it provides workplace level of respiratory protection for workers in providing protection against exposure to airborne contaminants Occupational Safety and Health Administration (OSHA) specifies 'Respirator APF' and 'Maximum Use Concentration' (MUC - a term derived using APF) shall be an integral part of Respirator Protection Standard. MUC establishes the maximum airborne concentration of a contaminant in which a respirator with a given APF may be used. The use of particulate respirators such as half face mask, full face mask and powered air purifying respirators is essential for radioactive jobs in nuclear facilities to prevent any intake of radionuclide. With this impetus, the Protection Factor Test Facility (PFTF) for testing and evaluation of respiratory protective equipment meeting relevant applicable standards was designed, fabricated and installed in Respiratory Protective Equipment Laboratory of Health Physics Division

  20. Vendor-based laser damage metrology equipment supporting the National Ignition Facility

    International Nuclear Information System (INIS)

    Campbell, J. H; Jennings, R. T.; Kimmons, J. F.; Kozlowski, M. R.; Mouser, R. P.; Schwatz, S.; Stolz, C. J.; Weinzapfel, C. L.

    1998-01-01

    A sizable laser damage metrology effort is required as part of optics production and installation for the 192 beam National Ignition Facility (NIF) laser. The large quantities, high damage thresholds, and large apertures of polished and coated optics necessitates vendor-based metrology equipment to assure component quality during production. This equipment must be optimized to provide the required information as rapidly as possible with limited operator experience. The damage metrology tools include: (1) platinum inclusion damage test systems for laser amplifier slabs, (2) laser conditioning stations for mirrors and polarizers, and (3) mapping and damage testing stations for UV transmissive optics. Each system includes a commercial Nd:YAG laser, a translation stage for the optics, and diagnostics to evaluate damage. The scanning parameters, optical layout, and diagnostics vary with the test fluences required and the damage morphologies expected. This paper describes the technical objectives and milestones involved in fulfilling these metrology requirements

  1. Listeria monocytogenes contamination of the environment and surfaces of the equipment in the meat processing facilities in republic of Macedonia

    Directory of Open Access Journals (Sweden)

    Dean Jankuloski

    2007-11-01

    Full Text Available Listeria monocytogenes contamination of the environment and surfaces of the equipment was examined in seven meat processing facilities. Up to date prevalence of this foodborn pathogen in meat processing facilities facilities in Republic of Macedonia was unknown. Biofilms are composed from food spoilage microorganisms and food born pathogens. They are located on the surfaces of the equipment that come in contact with food and in facilities environment. Microorganisms in biofilm presenting micro eco system and are source of dissemination and contamination of food born pathogens in final meat products. During the preparation of this study we have covered a 7 meat processing facilities and we took a total of 39 swabs from surfaces that come in direct or indirect contact with food. Listeria monocytogenes was discovered in 10 (25,64% swabs (locations. Prevalence of other Listeria spp. compared with total number of taken samples was 15 (38,46% Listeria innocua, 3 (7,69% Listeria welshimeri and 1 (2,65% isolate Listeria seeligeri.

  2. A study on surveillance equipment at the exit/entry control point of nuclear facility

    International Nuclear Information System (INIS)

    Park, C. S.; Kim, D. Y.; Cha, H. L.; Kim, H. D.; Hong, J. S.

    1999-01-01

    Exit/Entry control is an essential measure at both entrances of the protected area and vital area of nuclear facility at which physical protection is required under the relevant laws and regulations. Especially, when there are heavy traffics of personnel and process equipment in those areas, automated surveillance devices have to be introduced to timely and efficiently screen out internal and external adversaries from achieving their goals of stealing of nuclear material and/or sabotage of the facility. The major portion of this study involves with integration and processing of signals from radiation detector, metal detector, and image monitor. This integrated device together with positive personal identification device which will be reinforced in near future would contribute to the establishment of total exit/entry control point of nuclear facility

  3. Spent nuclear fuel project cold vacuum drying facility safety equipment list

    International Nuclear Information System (INIS)

    IRWIN, J.J.

    1999-01-01

    This document provides the safety equipment list (SEL) for the Cold Vacuum Drying Facility (CVDF). The SEL was prepared in accordance with the procedure for safety structures, systems, and components (SSCs) in HNF-PRO-516, ''Safety Structures, Systems, and Components,'' Revision 0 and HNF-PRO-097, Engineering Design and Evaluation, Revision 0. The SEL was developed in conjunction with HNF-SO-SNF-SAR-O02, Safety Analysis Report for the Cold Vacuum Drying Facility, Phase 2, Supporting Installation of Processing Systems (Garvin 1998). The SEL identifies the SSCs and their safety functions, the design basis accidents for which they are required to perform, the design criteria, codes and standards, and quality assurance requirements that are required for establishing the safety design basis of the SSCs. This SEL has been developed for the CVDF Phase 2 Safety Analysis Report (SAR) and shall be updated, expanded, and revised in accordance with future phases of the CVDF SAR until the CVDF final SAR is approved

  4. 29 CFR 1917.41 - House falls.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 7 2010-07-01 2010-07-01 false House falls. 1917.41 Section 1917.41 Labor Regulations...) MARINE TERMINALS Cargo Handling Gear and Equipment § 1917.41 House falls. (a) Span beams shall be secured... working with house fall blocks. (c) Designated employees shall inspect chains, links, shackles, swivels...

  5. Efficacy and Palatability of Different Rodenticide Formulations Applied against House Mouse (Mus musculus L. in Plant Storage Facilities

    Directory of Open Access Journals (Sweden)

    Goran Jokić

    2008-01-01

    Full Text Available Palatability (daily intake of different rodenticide formulations based on bromadiolone was compared in experiments with house mouse (Mus musculus L. in agricultural storage facilities, and rodent numbers were assessed at the beginning and end of experiment, as well as rodenticide efficacy. The dynamic of bait intake was monitored for ten days in facilities of the Institute of Animal Husbandry in Zemun and the Agricultural Cooperatives at Starčevo and Omoljica. The experiments complied with the relevant standard method of OEPP/EPPO. Agricultural products were stored either as bulk commodities or in sacs laid on pallete racks in the treated facilities. Baits were laid in boxes on mice routes below palletes holding sacs and on places where significant damage had been observed, at 1-3 m spacing and in 10-20 g portions. Mouse abundance was estimated based on the highest and lowest daily intakes of bait by mice over a period of 10 days, which was divided by the mouse daily feed requirement. The presence of house mouse was also monitored over the next 20 days. The efficacy of test products was computed using Abbott’s formula.

  6. Operating experience with remote handling equipment in a typical hot facility

    International Nuclear Information System (INIS)

    Ravishankar, A.; Balasubramanian, G.R.

    1990-01-01

    Large number of articulated arm manipulators and special purpose remote tools have been used either alone or in combination in a recent campaign of treatment of irradiated J rods of CIRUS for separation of 233 U. These equipments were used for operations such as remote maintenance of centrifuge, centrifugal extractor, direct sampling, assistance for sample conveying operations etc. Paper discusses problems encountered in using articulated arm manipulators of type MAll,AMl and how they were overcome. Problems encountered in use of model-8 manipulator for chopper maintenence in a mockup facility are also highlighted. (author). 4 figs., 1 tab

  7. On-Line Radiation Test Facility for Industrial Equipment needed for the Large Hadron Collider at CERN

    CERN Document Server

    Rausch, R

    1999-01-01

    The future Large Hadron Collider to be built at CERN will use superconducting magnets cooled down to 1.2 K. To preserve the superconductivity, the energy deposition dose levels in equipment located outside the cryostat, in the LHC tunnel, are calculated to be of the order of 1 to 10 Gy per year. At such dose levels, no major radiation-damage problems are to be expected, and the possibility of installing Commercial Of The Shelf (COTS) electronic equipment in the LHC tunnel along the accelerator is considered. To this purpose, industrial electronic equipment and circuits have to be qualified and tested against radiation to insure their long term stability and reliability. An on-line radiation test facility has been setup at the CERN Super Proton Synchrotron (SPS) and a program of on-line tests for electronic equipment is ongoing. Equipment tested includes Industrial Programmable Logic Controllers (PLCs) from several manufacturers, standard VME modules, Fieldbuses like Profibus, WorldFIP and CAN, various electro...

  8. Validation of the Verbal and Social Interaction questionnaire: carers' focus in the carer-resident relationship in supported housing facilities for persons with psychiatric disabilities (VSI-SH).

    Science.gov (United States)

    Brunt, D; Rask, M

    2013-04-01

    A questionnaire to measure the verbal and social interactions between carers and residents in supported housing facilities for persons with psychiatric disabilities has been developed. It is an adaptation of a questionnaire originally used in a forensic psychiatric setting. The aim of the present study was thus to investigate the construct validity and the reliability of this new version of the Verbal and Social Interactions questionnaire for use in supported housing facilities (VSI-SH). Two hundred and twenty-three carers from municipal and privately run housing facilities completed the questionnaire. A factor analysis was performed, which resulted in six factors. The number of items was reduced from the original 47 to 30 in order to minimize factorial complexity and multiple loadings. The reliability was tested with Cronbach's alpha and good internal consistency for the questionnaire and five of the six factors was found. The resulting six factors and the items were compared to the conceptual model and four of the six factors corresponded well with the categories in this original theoretical model. The questionnaire can be a useful contribution to the study of interactions between carers and residents in supported housing facilities for persons with psychiatric disabilities. © 2012 Blackwell Publishing.

  9. Housing Characteristics, 1990

    International Nuclear Information System (INIS)

    1992-01-01

    This report on energy consumption in the residential sector covers the following topics: housing trends 1980--1990, new housing trends, availability and usage of natural gas by households, changes in appliance usage (refrigerators, entertainment appliances, cooking appliances, convenience appliances), age of major household appliances and equipment, household energy conservation activities, demand-side management programs, and a portrait of households using solar or wood as a source of energy

  10. Methods to estimate equipment and materials that are candidates for removal during the decontamination of fuel processing facilities

    International Nuclear Information System (INIS)

    Duncan, D.R.; Valero, O.J.; Hyre, R.A.; Pottmeyer, J.A.; Millar, J.S.; Reddick, J.A.

    1995-02-01

    The methodology presented in this report provides a model for estimating the volume and types of waste expected from the removal of equipment and other materials during Decontamination and Decommissioning (D and D) of canyon-type fuel reprocessing facilities. This methodology offers a rough estimation technique based on a comparative analysis for a similar, previously studied, reprocessing facility. This approach is especially useful as a planning tool to save time and money while preparing for final D and D. The basic methodology described here can be extended for use at other types of facilities, such as glovebox or reactor facilities

  11. Development of aging management standard guidelines for HVAC facilities of NPPs in Korea

    International Nuclear Information System (INIS)

    Won, Se Youl; Lee, Jae Gon; Oh, Seung Jin

    2014-01-01

    Inspection and maintenance activities for air conditioning facilities within the plant are managed mainly for active facilities, and as the years of operation pass, a method for detecting in advance aging-related integrity problems of passive facilities and taking necessary measures against them is required. Therefore, this paper establishes a standard aging management guideline for air conditioning facilities by selecting systems for which those facilities are to be managed, analyzing degradation mechanisms and reviewing the current status of aging degradation management. According to the review of additional equipment-specific aging degradation mechanisms and the current status of management to apply the aging degradation program to air conditioning facilities, it has been found that internal and external visual inspection procedures for fans, dampers, coils, filters and housings have to be added. It has been confirmed that among additional equipment s, fire dampers, fan bearings and belts and air cleaning/conditioning units with charcoal filters do not require additional inspection as they are periodically inspected. It has been found, however, that air cleaning/conditioning units without charcoal filters are to be inspected along with fans, ducts and coils

  12. Active seismic response control systems for nuclear power plant equipment facilities

    International Nuclear Information System (INIS)

    Kobori, Takuji; Kanayama, Hiroo; Kamagata, Shuichi

    1989-01-01

    To sustain severe earthquake ground motion, a new type of anti-seismic structure is proposed, called a Dynamic Intelligent Building (DIB) system, which is positioned as an active seismic response controlled the structure. The structural concept starts from a new recognition of earthquake ground motion, and the structural natural frequency is actively adjusted to avoid resonant vibration, and similarly the external counter-force cancels the resonant force which comes from the dynamic structural motion energy. These concepts are verified using an analytical simulator program. The advanced application of the DIB system, is the Active Supporting system and the Active Stabilizer system for nuclear power plant equipment facilities. (orig.)

  13. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  14. Equipment system for advanced nuclear fuel development

    International Nuclear Information System (INIS)

    Kwon, Hyuk Il; Ji, C. G.; Bae, S. O.

    2002-11-01

    The purpose of the settlement of equipment system for nuclear Fuel Technology Development Facility(FTDF) is to build a seismic designed facility that can accommodate handling of nuclear materials including <20% enriched Uranium and produce HANARO fuel commercially, and also to establish the advanced common research equipment essential for the research on advanced fuel development. For this purpose, this research works were performed for the settlement of radiation protection system and facility special equipment for the FTDF, and the advanced common research equipment for the fuel fabrication and research. As a result, 11 kinds of radiation protection systems such as criticality detection and alarm system, 5 kinds of facility special equipment such as environmental pollution protection system and 5 kinds of common research equipment such as electron-beam welding machine were established. By the settlement of exclusive domestic facility for the research of advanced fuel, the fabrication and supply of HANARO fuel is possible and also can export KAERI-invented centrifugal dispersion fuel materials and its technology to the nations having research reactors in operation. For the future, the utilization of the facility will be expanded to universities, industries and other research institutes

  15. 9 CFR 3.27 - Facilities, outdoor.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Facilities, outdoor. 3.27 Section 3.27... Pigs and Hamsters Facilities and Operating Standards § 3.27 Facilities, outdoor. (a) Hamsters shall not be housed in outdoor facilities. (b) Guinea pigs shall not be housed in outdoor facilities unless...

  16. 24 CFR 982.614 - Group home: Housing quality standards.

    Science.gov (United States)

    2010-04-01

    ...) Sanitary facilities in the group home must be readily accessible to and usable by residents, including... adequate facilities and services for the sanitary disposal of food waste and refuse, including facilities... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Group home: Housing quality...

  17. Large Scale Leach Test Facility: Development of equipment and methods, and comparison to MCC-1 leach tests

    International Nuclear Information System (INIS)

    Pellarin, D.J.; Bickford, D.F.

    1985-01-01

    This report describes the test equipment and methods, and documents the results of the first large-scale MCC-1 experiments in the Large Scale Leach Test Facility (LSLTF). Two experiments were performed using 1-ft-long samples sectioned from the middle of canister MS-11. The leachant used in the experiments was ultrapure deionized water - an aggressive and well characterized leachant providing high sensitivity for liquid sample analyses. All the original test plan objectives have been successfully met. Equipment and procedures have been developed for large-sample-size leach testing. The statistical reliability of the method has been determined, and ''bench mark'' data developed to relate small scale leach testing to full size waste forms. The facility is unique, and provides sampling reliability and flexibility not possible in smaller laboratory scale tests. Future use of this facility should simplify and accelerate the development of leaching models and repository specific data. The factor of less than 3 for leachability, corresponding to a 200,000/1 increase in sample volume, enhances the credibility of small scale test data which precedes this work, and supports the ability of the DWPF waste form to meet repository criteria

  18. 40 CFR 63.11089 - What requirements must I meet for equipment leak inspections if my facility is a bulk gasoline...

    Science.gov (United States)

    2010-07-01

    ... equipment leak inspections if my facility is a bulk gasoline terminal, bulk plant, pipeline breakout station... gasoline service at the facility. (c) Each detection of a liquid or vapor leak shall be recorded in the log... shall be completed within 15 calendar days after detection of each leak, except as provided in paragraph...

  19. NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

    Science.gov (United States)

    Brokopp, Richard A.

    2004-01-01

    NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when

  20. Reactor fuel charging equipment

    International Nuclear Information System (INIS)

    Wade, Elman.

    1977-01-01

    In many types of reactor fuel charging equipment, tongs or a grab, attached to a trolley, housed in a guide duct, can be used for withdrawing from the core a selected spent fuel assembly or to place a new fuel assembly in the core. In these facilities, the trolley may have wheels that roll on rails in the guide duct. This ensures the correct alignment of the grab, the trolley and fuel assembly when this fuel assembly is being moved. By raising or lowering such a fuel assembly, the trolley can be immerged in the coolant bath of the reactor, whereas at other times it can be at a certain level above the upper surface of the coolant bath. The main object of the invention is to create a fuel handling apparatus for a sodium cooled reactor with bearings lubricated by the sodium coolant and in which the contamination of these bearings is prevented [fr

  1. Medical equipment in government health facilities: missed opportunities.

    Science.gov (United States)

    Pardeshi, Geeta S

    2005-01-01

    The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. (1) To identify the problems in different stages of the life cycle. (2) To assess its financial implications and effect on service delivery. Analysis of secondary data from the latest Comptroller and Auditor General (CAG) Reports for the states in India. The study variables were category of equipment, financial implications and problems in the stages of life cycle. Calculation of proportions. A total of forty instances mentioning problems in the first phase of the life cycle of medical equipment were noted in 12 state reports. The equipment from the radiology department (15), equipment in the wards (5), laboratory (3) and operation theatres (4) were the ones most frequently implicated. In a majority of cases the financial implications amounted to twenty-five lakhs. The financial implications were in the form of extra expenditure, unfruitful expenditure or locking of funds. In 25 cases the equipment could not be put to use because of non-availability of trained staff and inadequate infrastructural support. Careful procurement, incoming inspection, successful installation and synchronization of qualified trained staff and infrastructural support will ensure timely onset of use of the equipment.

  2. A control system of a mini survey facility for photometric monitoring

    Science.gov (United States)

    Tsutsui, Hironori; Yanagisawa, Kenshi; Izumiura, Hideyuki; Shimizu, Yasuhiro; Hanaue, Takumi; Ita, Yoshifusa; Ichikawa, Takashi; Komiyama, Takahiro

    2016-08-01

    We have built a control system for a mini survey facility dedicated to photometric monitoring of nearby bright (Kdome and a small (30-mm aperture) wide-field (5 × 5 sq. deg. field of view) infrared (1.0-2.5 microns) camera on an equatorial fork mount, as well as power sources and other associated equipment. All the components other than the camera are controlled by microcomputerbased I/O boards that were developed in-house and are in many of the open-use instruments in our observatory. We present the specifications and configuration of the facility hardware, as well as the structure of its control software.

  3. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  4. Air Kerma above environmental radiometric calibration facility for field equipment

    International Nuclear Information System (INIS)

    Conti, C.C.; Sachett, I.A.; Bertelli, L.; Lopes, R.T.

    2000-01-01

    The use of gamma ray spectrometers broadened the aims of gamma ray surveys, stead of measuring only the gross radiation, as was done with the GM tubes, it is now possible to be used for uranium exploration, geological mapping as an aid to the exploration of non radioactive ores like gold and tin, radiation background measurements to identify hot spots for radiation hazard evaluation and environmental monitoring of fallout from radiological and nuclear accidents. It became necessary to carefully and precisely calibrate the field equipment to be used to get all the information from such uses. There is an environmental radiometric calibration facility for field equipment, consisting of eight radioactive concrete sources, at the Institute of Radioprotection and Dosimetry - IRD (CNEN/Brazil). These sources are cylindrical with 3 m diameter, 0.5 m thick and weigh about 7.5 tons each. The amount and type of the radioactive material, 238 U and 232 Th and 40 K ores in secular radioactive equilibrium, added to the concrete to simulate rock outcrops, varies in order to obtain different gamma fields, varying in both energy and intensity. These different radiation fields were measured with a HPGe portable detector, specifically calibrated for spectrum stripping, and the air kerma energy distribution was determined for each concrete source and compared with the total air kerma calculated from the nuclide concentration and by others radiometric methods. (author)

  5. Medical equipment in government health facilities: Missed opportunities

    OpenAIRE

    Pardeshi Geeta

    2005-01-01

    BACKGROUND: The availability and optimal utilization of medical equipment is important for improving the quality of health services. Significant investments are made for the purchase, maintenance and repair of medical equipment. Inadequate management of these equipment will result in financial losses and deprive the public of the intended benefits. This analysis is based on the conceptual framework drawn from the WHO recommended- lifecycle of medical equipment. AIMS: (1) To identify the probl...

  6. Status of Activities to Implement a Sustainable System of MC&A Equipment and Methodological Support at Rosatom Facilities

    Energy Technology Data Exchange (ETDEWEB)

    J.D. Sanders

    2010-07-01

    Under the U.S.-Russian Material Protection, Control and Accounting (MPC&A) Program, the Material Control and Accounting Measurements (MCAM) Project has supported a joint U.S.-Russian effort to coordinate improvements of the Russian MC&A measurement system. These efforts have resulted in the development of a MC&A Equipment and Methodological Support (MEMS) Strategic Plan (SP), developed by the Russian MEM Working Group. The MEMS SP covers implementation of MC&A measurement equipment, as well as the development, attestation and implementation of measurement methodologies and reference materials at the facility and industry levels. This paper provides an overview of the activities conducted under the MEMS SP, as well as a status on current efforts to develop reference materials, implement destructive and nondestructive assay measurement methodologies, and implement sample exchange, scrap and holdup measurement programs across Russian nuclear facilities.

  7. Contained scanning electron microscope facility for examining radioactive materials

    International Nuclear Information System (INIS)

    Hsu, C.W.

    1986-03-01

    At the Savannah River Laboratory (SRL) radioactive solids are characterized with a scanning electron microscope (SEM) contained in a glove box. The system includes a research-grade Cambridge S-250 SEM, a Tracor Northern TN-5500 x-ray and image analyzer, and a Microspec wavelength-dispersive x-ray analyzer. The containment facility has a glove box train for mounting and coating samples, and for housing the SEM column, x-ray detectors, and vacuum pumps. The control consoles of the instruments are located outside the glove boxes. This facility has been actively used since October 1983 for high alpha-activity materials such as plutonium metal and plutonium oxide powders. Radioactive defense waste glasses and contaminated equipment have also been examined. During this period the facility had no safety-related incidents, and personnel radiation exposures were maintained at less than 100 mrems

  8. 24 CFR 965.306 - Energy conservation equipment and practices.

    Science.gov (United States)

    2010-04-01

    ... Measures § 965.306 Energy conservation equipment and practices. In purchasing original or, when needed, replacement equipment, PHAs shall acquire only equipment that meets or exceeds the minimum efficiency... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Energy conservation equipment and...

  9. Decommissioning of the Risoe hot cell facility

    International Nuclear Information System (INIS)

    Carlsen, H.

    1992-02-01

    Concise descriptions of actions taken in relation to the decommissioning of the hot cell facility at Risoe National Laboratory are presented. The removal of fissile material, of large contaminated equipment from the concrete cell line and a separate shielded storage facility, and the removal of large contaminated facilities such as out cell parts of a tube transport system between a concrete cell and a lead shielded steel box and a remotely operated Reichert Telatom microscope housed in a lead shielded glove box is described in addition to the initial mapping of radiation levels related to the decontamination of concrete cells. The dose commitment of 17.7 mSv was ascribed to 12 persons in the 2nd half of 1991. The work resulting in these doses was mainly handling of waste together with the frogman entrances in order to repair the in-cell crane and power manipulator. The overall time schedule for the project still appears to be applicable. (AB)

  10. Renewable energy for passive house heating. Part 1. Building description

    Energy Technology Data Exchange (ETDEWEB)

    Badescu, V. [Polytechnic Univ., Bucharest (Romania). Faculty of Mechanical Engineering; Sicre, B. [Technical Univ., Chemnitz (Germany). Computational Physics

    2003-12-01

    A passive house is a cost-efficient building that can manage throughout the heating period, due to its specific construction design, with more than 10 times less heat energy than the same building designed to standards presently applicable across Europe. Its extended thermal insulation and enhanced air-tightness removes the need for temperatures higher than 50 {sup o}C. This makes renewable energy sources particularly suitable for heating, cooling and domestic hot water production. Modeling of renewable energy usage for space heating requires as a preliminary stage the detailed description of the building structure, of the HVAC equipment and of the internal heat sources. This paper shows the main data used to model the thermal behavior of a passive house. Details about Pirmasens Passive House (Rhineland Palatinate, Germany) are given, as for example, the internal heat sources, including electric appliances, heat and humidity released by human bodies, thermal internal facilities as hot and cold water pipes. All these are quantified by using statistically derived data. A detailed time schedule for a standard German family with two adults and two children was prepared. It takes into account the national celebrations, vacation and weekends among others. (Author)

  11. 24 CFR 982.609 - Congregate housing: Housing quality standards.

    Science.gov (United States)

    2010-04-01

    ... accommodate the residents. (3) There must be adequate facilities and services for the sanitary disposal of food waste and refuse, including facilities for temporary storage where necessary. Group Home ... space and equipment to store, prepare, and serve food in a sanitary manner; (iii) Must be used to...

  12. Low-energy house in Sisimiut - Measurement equipment

    DEFF Research Database (Denmark)

    Andersen, Philip Hvidthøft Delff; Rode, Carsten; Madsen, Henrik

    on the power generated by the solar thermal system. A weather station equipped with thermometer, pyranometer and anemometer is installed on the building as well. Finally, it is described how to retrieve data from an SQL server which is configured to take monthly backups. R functions have been implemented...

  13. Sustainable Facilities Management

    DEFF Research Database (Denmark)

    Nielsen, Susanne Balslev; Elle, Morten; Hoffmann, Birgitte

    2004-01-01

    The Danish public housing sector has more than 20 years of experience with sustainable facilities management based on user involvement. The paper outlines this development in a historical perspective and gives an analysis of different approaches to sustainable facilities management. The focus...... is on the housing departments and strateies for the management of the use of resources. The research methods used are case studies based on interviews in addition to literature studies. The paper explores lessons to be learned about sustainable facilities management in general, and points to a need for new...

  14. Design concepts and advanced telerobotics development for facilities in the back end of the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Feldman, M.J.

    1987-01-01

    In the Fuel Recycle Division at the Oak Ridge National Laboratory, a comprehensive remote systems development program has existed for the past seven years. The new remote technology under development is expected to significantly improve remote operations by extending the range of tasks accomplished by remote means and increasing the efficiency of remote work undertaken. Five areas of the development effort are primary contributors to the goal of higher operating efficiency for major facilities for the back end of the nuclear fuel cycle. These areas are the single-cell concept, the low-flow ventilation concept, television viewing, equipment-mounting racks, and force-reflecting manipulation. These somewhat innovative directions are products of a design process where the technical scenario to be accomplished, the remote equipment to accomplish the scenario, and the facility design to house the equipment, are considered in an iterative design process to optimize performance, maximize long-term costs effectiveness, and minimize initial capital outlay. 14 refs., 3 figs

  15. Design concepts and advanced telerobotics development for facilities in the back end of the nuclear fuel cycle

    International Nuclear Information System (INIS)

    Feldman, M.J.

    1987-01-01

    In the Fuel Recycle Division at the Oak Ridge National Laboratory (ORNL), a comprehensive remote systems development program has existed for the past seven years. The new remote technology under development is expected to significantly improve remote operations by extending the range of tasks accomplished by remote means and increasing the efficiency of remote work undertaken. Five areas of the development effort are primary contributors to the goal of higher operating efficiency for major facilities for the back end of the nuclear fuel cycle. These areas are (1) the single-cell concept, (2) the low-flow ventilation concept, (3) television viewing, (4) equipment-mounting racks, and (5) force-reflecting manipulation. These somewhat innovative directions are products of a design process where the technical scenario to be accomplished, the remote equipment to accomplish the scenario, and the facility design to house the equipment, are considered in an iterative design process to optimize performance, maximize long-term costs effectiveness, and minimize initial capital outlay. (author)

  16. ORNL Isotopes Facilities Shutdown Program Plan

    International Nuclear Information System (INIS)

    Gibson, S.M.; Patton, B.D.; Sears, M.B.

    1990-10-01

    This plan presents the results of a technical and economic assessment for shutdown of the Oak Ridge National Laboratory (ORNL) isotopes production and distribution facilities. On December 11, 1989, the Department of Energy (DOE), Headquarters, in a memorandum addressed to DOE Oak Ridge Operations Office (DOE-ORO), gave instructions to prepare the ORNL isotopes production and distribution facilities, with the exception of immediate facility needs for krypton-85, tritium, and yttrium-90, for safe shutdown. In response to the memorandum, ORNL identified 17 facilities for shutdown. Each of these facilities is located within the ORNL complex with the exception of Building 9204-3, which is located at the Y-12 Weapons Production Plant. These facilities have been used extensively for the production of radioactive materials by the DOE Isotopes Program. They currently house a large inventory of radioactive materials. Over the years, these aging facilities have inherited the problems associated with storing and processing highly radioactive materials (i.e., facilities' materials degradation and contamination). During FY 1990, ORNL is addressing the requirements for placing these facilities into safe shutdown while maintaining the facilities under the existing maintenance and surveillance plan. The day-to-day operations associated with the surveillance and maintenance of a facility include building checks to ensure that building parameters are meeting the required operational safety requirements, performance of contamination control measures, and preventative maintenance on the facility and facility equipment. Shutdown implementation will begin in FY 1993, and shutdown completion will occur by the end of FY 1994

  17. The Effects of Housing on Health and Health Risks in an Aging Population

    DEFF Research Database (Denmark)

    Wulff, Anne Louise; Somrongthong, Ratana; Dullyperadis, Saovalux

    2014-01-01

    Background. Over the last decade, Thailand has experienced an aging population, especially in rural areas. Research finds a strong, positive relationship between good quality housing and health, and this paper assesses the impact and living experience of housing of older people in rural Thailand...... for the older people: “lighting and unsafe wires,” “house design and composition,” “maintenance of the house,” and “health care equipment.” The housing was not appropriately designed to accommodate health care equipment or to fully support individual daily activities of older people. Numerous accidents occurred...

  18. The operation of post-irradiation examination facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eun Ka; Park, Kwang Jun; Lee, Won Sang [and others; Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1994-01-01

    The operation and management of PIE facility was executed in 1993. An indigenous 16 x 16 PWR type fuel assembly (ID No. J44) which was discharged from Kori unit 2 power reactor was transported to KAERI`s PIE facility and in-pool nondestructive examination and hot cell examination for the fuel were carried out. Because the above-mentioned 16 x 16 fuel is different from 14 x 14 fuel in its size and array of fuel rods, several examination and handling equipment for the 16 x 16 type fuel were designed and fabricated. PIE facility was operated in normal condition with the periodical check and inspection of the devices. The filter housing on the roof hood in chemical analysis hot cell was modified mounting air pressure gauge to indicate the optimal filter exchanging time. The burst air heating coil plate and the broken blowing fan of the HVAC system were repaired. The defaced grand packing in pool water circulation pump was replaced with the mechanical seal to prevent the leakage from the pump shaft sealing. The radiation monitoring in the facility was carried out to maintain the safe working condition and several radiation monitors were repaired. Spare parts for the radiation monitoring system were prepared to maintain the facility safely. The performance test of the emergency electric power supply system including UPS, battery and diesel generator was carried out. Oxide layer thickness measuring device for the performance test. Several devices including spent fuel handling equipment for the 17 x 17 PWR type fuel assembly were designed and fabricated for the subsequent PIE of nuclear fuels. 35 tabs., 17 figs., 7 refs. (Author) .new.

  19. Dimensions of Housing Deprivation for Older People in Ireland

    Science.gov (United States)

    Nolan, Brian; Winston, Nessa

    2011-01-01

    Housing is an important aspect of living standards and quality of life for older persons, but the housing-related problems they may face encompass rather different circumstances, relating to the condition of the dwelling, how well equipped it is, whether housing costs represent a serious burden, and whether the neighbourhood environment is…

  20. Acoustic absorption of natural gas compression facility enclosures

    Energy Technology Data Exchange (ETDEWEB)

    Lassen, P.; Wong, G. [Noise Management Ltd., Calgary, AB (Canada)

    2009-07-01

    Noise sources at gas compressor facilities include the enclosure/building housing a gas engine and compressor, the ventilation openings, doors and windows for the enclosure, the engine air intake and exhaust, and a cooler. Accurate predictions of the noise levels inside the enclosure, the breakout noise from open windows and doors and ventilation, as well as the transmission through the walls, is necessary in order to determine cost effective noise mitigation for the facility. In order to accurately predict the sound breakout from these facilities it is necessary to know the acoustic absorption of the interior of these equipment enclosures. Although the acoustic absorption data of the wall systems may be available, the absorption attributable to the non-enclosure surfaces, the equipment and fittings, is not usually known and is difficult to predict. Since piping, instrumentation and mechanical equipment often take on a typical arrangement, shape, volumetric density and material composition, it is useful to know the typical acoustic absorption attributable to these items. In this study, reverberation time (RT) measurements were taken at 2 decommissioned gas compressor facilities in order to determine the absorption characteristics of the enclosure. The RT was measured according to ASTM C423-02a. The overall absorption coefficient of a compressor enclosure with a solid liner was found to be similar to that of steel decking. Fittings within the enclosure did not increase the high frequency absorption of the enclosure. It was concluded that room modes, structural vibrations, and fittings may serve to increase the effective absorption at frequencies below 630 Hz. Because of the small dimensions of the enclosure, low-frequency response of the room affected the reliability of the data below 160Hz. Structural vibration of the enclosure was investigated, and may considerably influence the noise breakout from the enclosure apart from the interior acoustical considerations. 4

  1. Acoustic absorption of natural gas compression facility enclosures

    International Nuclear Information System (INIS)

    Lassen, P.; Wong, G.

    2009-01-01

    Noise sources at gas compressor facilities include the enclosure/building housing a gas engine and compressor, the ventilation openings, doors and windows for the enclosure, the engine air intake and exhaust, and a cooler. Accurate predictions of the noise levels inside the enclosure, the breakout noise from open windows and doors and ventilation, as well as the transmission through the walls, is necessary in order to determine cost effective noise mitigation for the facility. In order to accurately predict the sound breakout from these facilities it is necessary to know the acoustic absorption of the interior of these equipment enclosures. Although the acoustic absorption data of the wall systems may be available, the absorption attributable to the non-enclosure surfaces, the equipment and fittings, is not usually known and is difficult to predict. Since piping, instrumentation and mechanical equipment often take on a typical arrangement, shape, volumetric density and material composition, it is useful to know the typical acoustic absorption attributable to these items. In this study, reverberation time (RT) measurements were taken at 2 decommissioned gas compressor facilities in order to determine the absorption characteristics of the enclosure. The RT was measured according to ASTM C423-02a. The overall absorption coefficient of a compressor enclosure with a solid liner was found to be similar to that of steel decking. Fittings within the enclosure did not increase the high frequency absorption of the enclosure. It was concluded that room modes, structural vibrations, and fittings may serve to increase the effective absorption at frequencies below 630 Hz. Because of the small dimensions of the enclosure, low-frequency response of the room affected the reliability of the data below 160Hz. Structural vibration of the enclosure was investigated, and may considerably influence the noise breakout from the enclosure apart from the interior acoustical considerations. 4

  2. Design Study and Optimization of Irradiation Facilities for Detector and Accelerator Equipment Testing in the SPS North Area at CERN

    CERN Document Server

    AUTHOR|(CDS)2079748; Stekl, Ivan

    Due to increasing performance of LHC during the last years, the strong need of new detector and electronic equipment test areas at CERN appeared from user communities. This thesis reports on two test facilities: GIF++ and H4IRRAD. GIF++, an upgrade of GIF facility, is a combined high-intensity gamma and particle beam irradiation facility for testing detectors for LHC. It combines a high-rate 137Cs source, providing photons with energy of 662 keV, together with the high-energy secondary particle beam from SPS. H4IRRAD is a new mixed-field irradiation area, designed for testing LHC electronic equipment for radiation damage effects. In particular, large volume assemblies such as full electronic racks of high current power converters can be tested. The area uses alternatively an attenuated primary 400 GeV/c proton beam from SPS, or a secondary, mainly proton, beam of 280 GeV/c directed towards a copper target. Different shielding layers are used to reproduce a radiation field similar to the LHC “tunnel” and �...

  3. Status of Activities to Implement a Sustainable System of MC and A Equipment and Methodological Support at Rosatom Facilities

    International Nuclear Information System (INIS)

    Sanders, J.D.

    2010-01-01

    Under the U.S.-Russian Material Protection, Control and Accounting (MPC and A) Program, the Material Control and Accounting Measurements (MCAM) Project has supported a joint U.S.-Russian effort to coordinate improvements of the Russian MC and A measurement system. These efforts have resulted in the development of a MC and A Equipment and Methodological Support (MEMS) Strategic Plan (SP), developed by the Russian MEM Working Group. The MEMS SP covers implementation of MC and A measurement equipment, as well as the development, attestation and implementation of measurement methodologies and reference materials at the facility and industry levels. This paper provides an overview of the activities conducted under the MEMS SP, as well as a status on current efforts to develop reference materials, implement destructive and nondestructive assay measurement methodologies, and implement sample exchange, scrap and holdup measurement programs across Russian nuclear facilities.

  4. Housing and population sprawl near tailings storage facilities in the Witwatersrand: 1952 to current

    Directory of Open Access Journals (Sweden)

    Melanie A. Kneen

    2015-11-01

    Full Text Available Mining, tailings storage facilities (TSFs, dust pollution and growth in residential housing development are synonymous with the Witwatersrand, South Africa. Encroachment of housing onto land close to TSFs, i.e. areas rendered marginal because of the dust hazard and risk of structural failure, has continued unabated for decades, intensifying human exposure to windblown mineral dust. Recent research indicates that the finer milling used for modern gold extraction results in aeolian dust emanating from the TSFs which contributes to a higher proportion of inhalable particles in the source material. Air quality dispersion modelling, validated by ambient aerosol monitoring campaigns, indicates that episodic dust events generate particulate matter (PM10 and, specifically, quartz dust concentrations that are unhealthy at distances of up to 2 km downwind from TSFs. This contribution documented residential development from 1952 to 2011 (using historical aerial photographs, census data from 2001 and 2011 and ancillary information to determine the population exposed to dust emanations from the TSFs. Using the images, land use was classified into residential areas, TSF footprints and open areas, onto which a series of 500 m buffer zone contours were superimposed. The resulting statistics were used to assess the populations exposed to dust hazard within the defined buffer zones. Overall, housing development has experienced a growth of approximately 700% since 1952 at a rate of 14% per year. Analysis of recent monitoring campaign data has confirmed multiple occurrences of quartzrich inhalable dust in residential settings at levels that exceed occupational health standards, extrapolated to values for population exposure.

  5. 18 CFR 367.57 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... piers and foundations that are designed to be as permanent as the buildings that house the equipment, or... walls, ceilings or floors or without in some way impairing the building, must be included in the...

  6. LEMA facility and equipments for minor actinides compounds fabrication and characterisation

    Energy Technology Data Exchange (ETDEWEB)

    Donnet, L. [Commissariat a l' Energie Atomique - CEA, CEA/DEN/VRH/DTEC/SDTC/LEMA (France)

    2008-07-01

    The LEMA (Actinide based materials study laboratory) is mainly involved in minor actinides materials development and fabrication, from raw materials choice and synthesis to finished products including pin assembly. The aim of the technological analyses is to establish choices of raw materials and manufacturing techniques. The LEMA is located in the ATALANTE facility in Marcoule. It consists in two shielded chains (one specific for neutrons) and three hot laboratories. The laboratory has various apparatuses in hot cells such as: ball mills, press, dilatometer, TGA (thermo-gravimetry analyser), calcination and sintering furnaces (2000 deg. C). The laboratory has also characterisation apparatuses such as XRD and SEM (scanning electron microscopy) dedicated to structural and microstructural studies. Thanks to the diversity of its equipment, the LEMA has well established worldwide collaborations and takes part in international fuels/target fabrication and irradiation experiments. (author)

  7. LEMA facility and equipments for minor actinides compounds fabrication and characterisation

    International Nuclear Information System (INIS)

    Donnet, L.

    2008-01-01

    The LEMA (Actinide based materials study laboratory) is mainly involved in minor actinides materials development and fabrication, from raw materials choice and synthesis to finished products including pin assembly. The aim of the technological analyses is to establish choices of raw materials and manufacturing techniques. The LEMA is located in the ATALANTE facility in Marcoule. It consists in two shielded chains (one specific for neutrons) and three hot laboratories. The laboratory has various apparatuses in hot cells such as: ball mills, press, dilatometer, TGA (thermo-gravimetry analyser), calcination and sintering furnaces (2000 deg. C). The laboratory has also characterisation apparatuses such as XRD and SEM (scanning electron microscopy) dedicated to structural and microstructural studies. Thanks to the diversity of its equipment, the LEMA has well established worldwide collaborations and takes part in international fuels/target fabrication and irradiation experiments. (author)

  8. Quality of life in boarding houses and hostels: a residents' perspective.

    Science.gov (United States)

    Horan, M E; Muller, J J; Winocur, S; Barling, N

    2001-08-01

    In the last forty years deinstitutionalization has transferred the care of people with a serious mental illness from the psychiatric hospitals to community based facilities. More recently it has been questioned whether these new facilities offer the anticipated benefits of quality of life. This study examines the Quality of Life (QOL) of people diagnosed with schizophrenia living in two different accommodation facilities, hostels and boarding houses. QOL is examined from the resident's perspective. Lehman's (1988b) QOL Interview was used to measure objective, subjective, and global QOL of 60 participants in three hostels and two boarding house clusters. Hostel and boarding house data were compared and results showed that residents preferred boarding house accommodation. Overall, residents of both accommodation facilities reported satisfaction with QOL, and indicated that they regard them as asylum or sanctuary from the outside world.

  9. Radiation protection housing

    Energy Technology Data Exchange (ETDEWEB)

    Maier, A

    1975-04-10

    The radiation protection housing consists of a foot rim with castor swivel wheels, a tubular frame tapering off at the top, and a crown. In the upper part of the tubular frame a lead glass window is permanently installed. The sides are covered with radiation attenuating curtains of leaded rubber. The housing has the shape of a truncated pyramid which can be dismantled into its constituent parts. It is used for protection from radiation encountered in X-ray facilities in dental radiology.

  10. Characterization equipment essential/support drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings and Support Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). Support Drawings: Are those drawings identified by facility staff that further describe the design details of structures, systems, or components shown on essential drawings. (HNF 1997a) The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered General drawings until the Characterization Equipment Drawing Evaluation Report (Wilson 1998) is updated during fiscal year 1999. Trucks 1 and 2 drawings are not included in this revision of the essential drawing list due to uncertainty about future use

  11. Evaluation of the Nuclear Medicine facilities in Minas Gerais state: quality control program of equipment

    International Nuclear Information System (INIS)

    Kubo, Tadeu Takao Almodovar; Biancardi, Rodrigo; Rocha, Adriana Marcia Guimaraes; Ferreira, Denia Romao; Silva, Franciele Aquiles Anjos; Assuncao, Jonathan Buenos Aires; Alves, Ederson Henrique; Almeida, Ana Flavia Batista; Alves, Nathalia Fernandes; Xavier, Faber Henrique Zacarias; Gontijo, Rodrigo Modesto Gadelha; Mamede, Marcelo; Universidade Federal de Minas Gerais

    2017-01-01

    With the reformulation of the CNEN-NN-3.05 standard in December 2013, Brazil's Nuclear Medicine (NMS) services have to perform a greater number of quality controls for SPECT and PET equipment. However, little is known about the reality of the quality control programs of these services regarding the application of the new standard. Thus, in this context, the objective of the present study was to evaluate the quality control program of MNSs in the state of Minas Gerais. All NMSs in the state of Minas Gerais were invited to participate in the project. Of these, 34.48% (20 facilities) agreed to participate in the project, 50.00% (29 facilities) did not respond to the invitation and 15.52%(9 facilities) declined their participation. Thus, as of November 2015, 20 SPECT and 2 PET/CT equipment were evaluated for the performance of the quality control tests recommended by the new CNEN standard. The phantoms required for the evaluation came from the Laboratory of Dosimetry and Quality Control of UFMG. Even with the deadlines set by CNEN for the implementation of the quality control program in the NMSs, more than 50% of the evaluated services did not implement the quality controls, and the absence of specific phantoms is the main reason for the failure. Among the problems found in the installations, the most critical were: collimators with no conditions of use in the clinical routine, linearity problems of the evaluated image and values of image uniformity superior to the limits of acceptance. Problems in the uniformity and linearity of the image found directly impacted the performance of other tests, such as spatial resolution, SPECT performance, among others. In a general way, the NMSs in the state of Minas Gerais evaluated with the present study are in clinical feasible conditions. (author)

  12. Facility effluent monitoring plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Nickels, J.M.; Lavey, G.H.

    1992-12-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. A facility effluent monitoring plan determination was performed during Calendar Year 1991 and the evaluation requires the need for a facility effluent monitoring plan. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438**. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements

  13. Design of electronic measurement and quench detection equipment for the Current Lead Test facility Karlsruhe (CuLTKa)

    International Nuclear Information System (INIS)

    Hollik, Markus; Fietz, Walter H.; Fink, Stefan; Gehrlein, Mirko; Heller, Reinhard; Lange, Christian; Möhring, Tobias

    2013-01-01

    The Current Lead Test facility Karlsruhe (CuLTKa) is under construction at the Karlsruhe Institute of Technology (KIT) to perform acceptance tests of high temperature superconductor (HTS) current leads (CL). CuLTKa is in progress and present planning expects the completion in 2013. The data acquisition system is based on a modular design with electronic measurement and monitoring equipment covering a test voltage of 50 kV DC against ground. It provides plug-in units which enable temperature and voltage measurement at high voltage potential and in addition quench detection units which detect a loss of superconductivity reliably and quickly to avoid damage of the superconducting device under test. Prototype units for quench detection, temperature and voltage measurement have been successfully tested. Six temperature measurement units are already in use in the KIT test facility TOSKA and operated reliably during the acceptance tests of the HTS current leads for Wendelstein 7-X (W7-X) in 2011/2012. CuLTKa will be used first for 26 current leads which will be built in KIT for the fusion experiment JT-60SA. The present paper gives an overview of the design of the electronic measurement and quench detection equipment

  14. Performance analysis on natural energy autonomous house, HARBEMAN house; Shizen energy jiritsu house (HARBEMAN house) no simulation ni kansuru kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Fujino, T; Saito, T [Tohoku University, Sendai (Japan)

    1997-11-25

    Outlined herein are a procedure developed to simulate performance of an energy-autonomous (independent) solar house referred to as HARBEMAN HOUSE (HH) built in 1996 in City of Sendai, comparison between the simulated and observed results, and characteristics of the solar house. The house is equipped with a solar collector and sky radiator, both installed on the roof, the former facing south to collect solar energy and generate hot water whereas the latter facing north to radiate heat and generate cool water. Both are connected to an underground heat-insulated tank having a capacity of 31m{sup 3}, which stores hot or cool water to keep their conditions for extended periods. The solar system operates in heat- or cool-storage mode. In the heat-storage mode, quantity of heat stored increases, although at a slow rate, as tank capacity increases. In the cool-storage mode, on the other hand, quantity of cool stored increases in proportion to tank capacity. This is because solar energy is collected throughout the year whereas cooling by radiation is concentrated in early spring. Loss rate of heat stored increases as tank capacity increases, and the opposite trend is observed with cool stored. 12 refs., 7 figs., 2 tabs.

  15. Carbon Reduction Measures-Based LCA of Prefabricated Temporary Housing with Renewable Energy Systems

    Directory of Open Access Journals (Sweden)

    Ling Dong

    2018-03-01

    Full Text Available Temporary housing plays an important role in providing secure, hygienic, private, and comfortable shelter in the aftermath of disaster (such as flood, fire, earthquake, etc.. Additionally, temporary housing can also be used as a sustainable form of on-site residences for construction workers. While most of the building components used in temporary housing can be manufactured in a plant, prefabrication technology improves the production efficiency of temporary housing; furthermore, integrated renewable energy systems, for example, solar photovoltaic (PV system, offer benefits for temporary housing operations. In order to assess the environmental impacts of prefabricated temporary housing equipped with renewable energy systems, this study first divides the life cycle of temporary housing into six stages, and then establishes a life cycle assessment (LCA model for each stage. Furthermore, with the aim of reducing the environmental impacts, life cycle carbon reduction measures are proposed for each stage of temporary housing. The proposed methodology is demonstrated using a case study in China. Based on the proposed carbon reduction measures, the LCA of a prefabricated temporary housing case study building equipped with renewable energy systems indicates a carbon emissions intensity of 35.7 kg/m2·per year, as well as a reduction in material embodied emissions of 18%, assembly emissions of 17.5%, and operational emissions of 91.5%. This research proposes a carbon reduction-driven LCA of temporary housing and contributes to promoting sustainable development of prefabricated temporary housing equipped with renewable energy systems.

  16. Continuous measurements of ammonia, nitrous oxide and methane from air scrubbers at pig housing facilities.

    Science.gov (United States)

    Van der Heyden, C; Brusselman, E; Volcke, E I P; Demeyer, P

    2016-10-01

    Ammonia, largely emitted by agriculture, involves a great risk for eutrophication and acidification leading to biodiversity loss. Air scrubbers are widely applied to reduce ammonia emission from pig and poultry housing facilities, but it is not always clear whether their performance meets the requirements. Besides, there is a growing international concern for the livestock related greenhouse gases methane and nitrous oxide but hardly any data concerning their fate in air scrubbers are available. This contribution presents the results from measurement campaigns conducted at a chemical, a biological and a two-stage biological air scrubber installed at pig housing facilities in Flanders. Ammonia, nitrous oxide and methane at the inlet and outlet of the air scrubbers were monitored on-line during one week using a photoacoustic gas monitor, which allowed to investigate diurnal fluctuations in the removal performance of air scrubbers. Additionally, the homogeneity of the air scrubbers, normally checked by gas detection tubes, was investigated in more detail using the continuous data. The biological air scrubber with extra nitrification tank performed well in terms of ammonia removal (86 ± 6%), while the two-stage air scrubber suffered from nitrifying bacteria inhibition. In the chemical air scrubber the pH was not kept constant, lowering the ammonia removal efficiency. A lower ammonia removal efficiency was found during the day, when the ventilation rate was the highest. Nitrous oxide was produced inside the biological and two-stage scrubber, resulting in an increased outlet concentration of more than 200%. Methane could not be removed in the different air scrubbers because of its low water solubility. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Specific features of organizng the computer-aided design of radio-electronic equipment for electrophysical facilities

    International Nuclear Information System (INIS)

    Mozin, I.V.; Vasil'ev, M.P.

    1985-01-01

    Problems of developing systems for computer-aided design (CAD) of radioelectronic equipment for large electrophysical facilities such as charged particle accelerators of new generation are discussed. The PLATA subsystem representing a part of CAD and used for printed circuit design is described. The subsystem PLATA is utilized to design, on the average, up to 150 types of circuits a year, 100-120 of which belong to circuits of increased complexity. In this case labour productivity of a designer at documentation increases almost two times

  18. Change in operating parameters of the Continuous Electron Beam Accelerator Facility and Free Electron Laser, Thomas Jefferson National Accelerator Facility, Newport News, Virginia

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-10-01

    In this environmental assessment (EA), the US Department of Energy (DOE) reports the results of an analysis of the potential environmental impacts from a proposed change in operating parameters of the Continuous Electron Beam Accelerator Facility (CEBAF), and operation of the Free Electron Laser (FEL) facility beyond the initial demonstration period. With this proposal, DOE intends to increase CEBAF operating range from its current operating maximum beam energy of 4.0 GeV [giga-(billion) electron volts] to 8.0 GeV at a beam power of no greater than 1,000 kW [1 megawatt (MW)], its maximum attainable level, based on current technology and knowledge, without significant, costly equipment modifications. DOE has prepared an EA for this action to determine the potential for adverse impacts from operation of CEBAF and the FEL at the proposed levels. Changing the operating parameters of CEBAF would require no new major construction and minor modifications to the accelerator, its support systems, the FEL, and onsite utility systems. Modifications and performance improvements would be made to (1) the accelerator housed in the underground tunnels, (2) its support systems located in the above ground service buildings, and (3) the water and equipment cooling systems both in the tunnel and at the ground surface. All work would be performed on previously disturbed land and in, on, or adjacent to existing buildings, structures, and equipment. With the proposed action, the recently constructed FEL facility at the Jefferson Lab would operate in concert with CEBAF beyond its demonstration period and up to its maximum effective electron beam power level of 210 kW. In this EA, DOE evaluates the impacts of the no-action alternative and the proposed action alternative. Alternatives considered, but dismissed from further evaluation, were the use of another accelerator facility and the use of another technology.

  19. Change in operating parameters of the Continuous Electron Beam Accelerator Facility and Free Electron Laser, Thomas Jefferson National Accelerator Facility, Newport News, Virginia

    International Nuclear Information System (INIS)

    1997-10-01

    In this environmental assessment (EA), the US Department of Energy (DOE) reports the results of an analysis of the potential environmental impacts from a proposed change in operating parameters of the Continuous Electron Beam Accelerator Facility (CEBAF), and operation of the Free Electron Laser (FEL) facility beyond the initial demonstration period. With this proposal, DOE intends to increase CEBAF operating range from its current operating maximum beam energy of 4.0 GeV [giga-(billion) electron volts] to 8.0 GeV at a beam power of no greater than 1,000 kW [1 megawatt (MW)], its maximum attainable level, based on current technology and knowledge, without significant, costly equipment modifications. DOE has prepared an EA for this action to determine the potential for adverse impacts from operation of CEBAF and the FEL at the proposed levels. Changing the operating parameters of CEBAF would require no new major construction and minor modifications to the accelerator, its support systems, the FEL, and onsite utility systems. Modifications and performance improvements would be made to (1) the accelerator housed in the underground tunnels, (2) its support systems located in the above ground service buildings, and (3) the water and equipment cooling systems both in the tunnel and at the ground surface. All work would be performed on previously disturbed land and in, on, or adjacent to existing buildings, structures, and equipment. With the proposed action, the recently constructed FEL facility at the Jefferson Lab would operate in concert with CEBAF beyond its demonstration period and up to its maximum effective electron beam power level of 210 kW. In this EA, DOE evaluates the impacts of the no-action alternative and the proposed action alternative. Alternatives considered, but dismissed from further evaluation, were the use of another accelerator facility and the use of another technology

  20. Multi-Objective Optimization for Equipment Capacity in Off-Grid Smart House

    Directory of Open Access Journals (Sweden)

    Yasuaki Miyazato

    2017-01-01

    Full Text Available Recently, the off-grid smart house has been attracting attention in Japan for considering global warming. Moreover, the selling price of surplus power from the renewable energy system by Feed-In Tariff (FIT has declined. Therefore, this paper proposes an off-grid smart house with the introduced Photovoltaic (PV system, Solar Collector (SC system, Hot Water Heat Pump (HWHP, fixed battery and Electric Vehicle (EV. In this research, a multi-objective optimization problem is considered to minimize the introduced capacity and shortage of the power supply in the smart house. It can perform the electric power procurement from the EV charging station for the compensation of a shortage of power supply. From the simulation results, it is shown that the shortage of the power supply can be reduced by the compensation of the EV power. Furthermore, considering the uncertainty for PV output power, reliable simulation results can be obtained.

  1. 32 CFR 644.417 - For MCA family housing.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 4 2010-07-01 2010-07-01 true For MCA family housing. 644.417 Section 644.417... family housing. The Act of 1 September 1954, Pub. L. 765, 83rd Congress (68 Stat. 1119), as amended by... Construction-Army Family Housing at Military Installations and Facilities.” ...

  2. Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility

    Energy Technology Data Exchange (ETDEWEB)

    Jack Q. Richardson

    2012-06-28

    Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project cost match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.

  3. NORTH PORTAL - DOMESTIC COLD WATER CALCULATION - CHANGE HOUSE FACILITY NO.5008

    International Nuclear Information System (INIS)

    Blackstone, R.

    1996-01-01

    The purpose of this design analysis and calculation is to determine the demand for domestic cold water and to size the supply main piping for the Change House Facility No.5008 in accordance with the Uniform Plumbing Code (Section 4.4.1) and U.S. Department of Energy Order 6430.1A-1540 (Section 4.4.2). The method used for the calculations is based on the Uniform Plumbing Code (UPC), Section 4.4.1. The first step is to determine the maximum pressure drop between the most remote cold water plumbing fixture and the main distribution supply. The developed length of pipe from the supply to the fixture is then determined from the plumbing drawings. The maximum pressure drop is then divided by the developed length which results in the friction loss per 100 feet of pipe. Equivalent fixture units are assigned from the UPC based on the actual fixture count which when totaled determines the water flow rate. The water flow rate and pressure drop are used to determine the pipe size based on a given velocity of flow

  4. Hot-cell verification facility

    International Nuclear Information System (INIS)

    Eschenbaum, R.A.

    1981-01-01

    The Hot Cell Verification Facility (HCVF) was established as the test facility for the Fuels and Materials Examination Facility (FMEF) examination equipment. HCVF provides a prototypic hot cell environment to check the equipment for functional and remote operation. It also provides actual hands-on training for future FMEF Operators. In its two years of operation, HCVF has already provided data to make significant changes in items prior to final fabrication. It will also shorten the startup time in FMEF since the examination equipment will have been debugged and operated in HCVF

  5. General Guidelines for Remote Operation and Maintenance of Pyroprocess Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, S. H.; Park, B. S.; Park, H. S.; Lee, H. J.; Choi, C. W.; Lee, J. K

    2007-12-15

    As the pyroprocess handle the high radioactive materials, a high radioactive material handling facility required high safety, radioactive shielding, strict quality control, and the remote handling equipment of high technology. This report describes the guidelines of for pyroprocess based the design guides for radioactive material handling facility and equipment from American Nuclear Society(ANS), design guidelines for remotely maintained equipment from Oak Ridge National Laboratory(ORNL), and the experience of design for ACP equipment installed at the ACPF(Advanced Conditioning Process Facility). The General guidelines in this report are as follows. The General guidelines for remote operation and maintenance of pyroprocess equipment: Pyroprocess, Remote handling equipment for pyroprocess, General guide for remote operation and maintenance, general guidelines for the design of remotely operated and maintained equipment, Estimation and analysis for remote maintenance.

  6. Trilateral Initiative: IAEA authentication and national certification of verification equipment for facilities with classified forms of fissile material

    International Nuclear Information System (INIS)

    Haas, Eckard; Sukhanov, Alexander; Murphy, John

    2001-01-01

    Full text: Within the framework of the Trilateral Initiative, technical challenges have arisen due to the potential of the International Atomic Energy Agency (IAEA) monitoring fissile material with classified characteristics, as well as the IAEA using facility or host country supplied monitoring equipment. In monitoring material with classified characteristics, it is recognized that the host country needs to assure that classified information is not made available to the IAEA inspectors. Thus, any monitoring equipment used to monitor material with classified characteristics has to contain information security capabilities, such as information barriers. But likewise in using host-country-supplied monitoring equipment, regarding the material being monitored the IAEA has to have confidence that the information provided by the equipment is genuine and can be used by the IAEA in fulfilling its obligation to derive conclusions based on independent verification measures. Thus the IAEA needs to go through the process of authenticating the monitoring equipment. In the same way the host country needs to go through the process to assure itself that the monitoring equipment integrated with an information barrier will not divulge any classified information about an inspected sensitive item. Both processes require on large extent identical measures, but partially also may conflict with each other. The fact that monitoring equipment needs to exhibit information security throughout its lifecycle while at the same time be capable of being authenticated necessitates the need for creative technical approaches to be pursued. (author)

  7. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings: Those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. Support Drawings: Those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings

  8. Natural phenomena hazards evaluation of equipment and piping of Gaseous Diffusion Plant Uranium Enrichment Facility

    International Nuclear Information System (INIS)

    Singhal, M.K.; Kincaid, J.H.; Hammond, C.R.; Stockdale, B.I.; Walls, J.C.

    1995-01-01

    In support of the Gaseous Diffusion Plant Safety Analysis Report Upgrade program (GDP SARUP), a natural phenomena hazards evaluation was performed for the main process equipment and piping in the uranium enrichment buildings at Paducah and Portsmouth gaseous diffusion plants. In order to reduce the cost of rigorous analyses, the evaluation methodology utilized a graded approach based on an experience data base collected by SQUG/EPRI that contains information on the performance of industrial equipment and piping during past earthquakes. This method consisted of a screening walkthrough of the facility in combination with the use of engineering judgment and simple calculations. By using these screenings combined with evaluations that contain decreasing conservatism, reductions in the time and cost of the analyses were significant. A team of experienced seismic engineers who were trained in the use of the DOE SQUG/EPRI Walkdown Screening Material was essential to the success of this natural phenomena hazards evaluation

  9. Natural phenomena hazards evaluation of equipment and piping of Gaseous Diffusion Plant Uranium Enrichment Facility

    Energy Technology Data Exchange (ETDEWEB)

    Singhal, M.K.; Kincaid, J.H.; Hammond, C.R.; Stockdale, B.I.; Walls, J.C. [Oak Ridge National Lab., TN (United States). Technical Programs and Services; Brock, W.R.; Denton, D.R. [Lockheed Martin Energy Systems, Inc., Oak Ridge, TN (United States)

    1995-12-31

    In support of the Gaseous Diffusion Plant Safety Analysis Report Upgrade program (GDP SARUP), a natural phenomena hazards evaluation was performed for the main process equipment and piping in the uranium enrichment buildings at Paducah and Portsmouth gaseous diffusion plants. In order to reduce the cost of rigorous analyses, the evaluation methodology utilized a graded approach based on an experience data base collected by SQUG/EPRI that contains information on the performance of industrial equipment and piping during past earthquakes. This method consisted of a screening walkthrough of the facility in combination with the use of engineering judgment and simple calculations. By using these screenings combined with evaluations that contain decreasing conservatism, reductions in the time and cost of the analyses were significant. A team of experienced seismic engineers who were trained in the use of the DOE SQUG/EPRI Walkdown Screening Material was essential to the success of this natural phenomena hazards evaluation.

  10. Guide to research facilities

    Energy Technology Data Exchange (ETDEWEB)

    1993-06-01

    This Guide provides information on facilities at US Department of Energy (DOE) and other government laboratories that focus on research and development of energy efficiency and renewable energy technologies. These laboratories have opened these facilities to outside users within the scientific community to encourage cooperation between the laboratories and the private sector. The Guide features two types of facilities: designated user facilities and other research facilities. Designated user facilities are one-of-a-kind DOE facilities that are staffed by personnel with unparalleled expertise and that contain sophisticated equipment. Other research facilities are facilities at DOE and other government laboratories that provide sophisticated equipment, testing areas, or processes that may not be available at private facilities. Each facility listing includes the name and phone number of someone you can call for more information.

  11. NORTH PORTAL - HOT WATER CALCULATION - CHANGE HOUSE FACILITY NO.5008

    International Nuclear Information System (INIS)

    Blackstone, R.

    1996-01-01

    The purpose of this design analysis and calculation is to determine the demand for hot water and to size the supply main piping for the Change House Facility No.5008 in accordance with the Uniform Plumbing Code (UPC) (Section 4.4.1) and U.S. Department of Energy Order 6430.1A-1540. The method used for the calculations is based on Section 4.4.1. The first step is to determine the maximum pressure drop between the most remote plumbing fixture and the main supply. The pressure drop for the hot water system is based on the total length of the supply piping from the cold water supply source through the water heater to the most remote hot water outlet. Equivalent fixture units are then assigned using Section 4.4.1. For hot water, the values are reduced by 25 percent in accordance with the UPC. The demand load in gpm is then determined based on the number of fixture units. The demand load and the pressure drop between the source and the most remote fixture is used to determine the pipe size and the corresponding friction losses for a given flow velocity not to exceed 10 feet/second

  12. Association between Workplace and Housing Conditions and Use of Pesticide Safety Practices and Personal Protective Equipment among North Carolina Farmworkers in 2010

    Directory of Open Access Journals (Sweden)

    DL Levesque

    2012-03-01

    Full Text Available Background: There are inconsistencies about the effects of farmworker housing and workplace conditions and use of self-protective behavior practices and personal protective equipment (PPE. Objective: To investigate the association between workplace and housing conditions and farmworker use of pesticide safety practices and PPE. Methods: This study was conducted in 4 counties in North Carolina, USA, from July to October, 2010, during the agricultural growing season. Farmworkers working in agriculture aged 18 to 62 (n=187 were administered a structured questionnaire to collect self-reported measures on housing and workplace conditions. Use of pesticide safety and PPE were examined by asking questions about wearing gloves, wearing socks, and wearing a hat. Chi-square and multiple logistic regression analyses were used for statistical analyses. Results: Farmworkers reporting availability of enough hot and cold water for bathing and doing laundry were 13.6 times more likely to use pesticide safety practices (adjusted OR: 13.6, 95% CI: 1.4–135.4, whereas, those who reported that soap for handwashing was always or usually available while doing agricultural work were 7.8 times more likely to use pesticide safety practices (adjusted OR: 7.8, 95% CI: 3.3–18.5. Farmworkers that reported access to water to wash their hands with while performing agricultural work were more likely to use PPE (adjusted OR: 3.4, 95% CI: 1.3–9.2. Conclusions: Some migrant farmworker labor camps are not supplying acceptable housing conditions such as 1 handwashing sink per 6 people (n=10, 5.4%. Use of pesticide safety practices and PPE is greater when farmers provide decontamination supplies. Improvement of housing and workplace conditions are crucial to increase use of pesticide safety practices and PPE.

  13. The development of the American national standard, ''control of radioactive surface contamination on materials, equipment and facilities to be released for uncontrolled use''

    International Nuclear Information System (INIS)

    Shapiro, J.

    1980-01-01

    The American National Standard, Control of Radioactive Surface Contamination on Materials, Equipment and Facilities to be Released for Uncontrolled Use, was developed under the procedures of ANSI for ANSI Main Committee N13 (Radiation Protection) by a working group of the Health Physics Society Standards Committee. This standard provides criteria for the control of materials, equipment and facilities contaminated with radioactivity proposed to be released for uncontrolled use. Permissible contamination limits are specified as well as methods assessing the levels of contamination. This paper reviews the proceedings of the Subcommittee on Radioactive Surface Contamination, the comments received by reviewers of the standard, the resolution of the committee, and the bases for reaching the final limits, recommendations, and measurement procedures. (H.K.)

  14. Mobile terawatt laser propagation facility (Conference Presentation)

    Science.gov (United States)

    Shah, Lawrence; Roumayah, Patrick; Bodnar, Nathan; Bradford, Joshua D.; Maukonen, Douglas; Richardson, Martin C.

    2017-03-01

    This presentation will describe the design and construction status of a new mobile high-energy femtosecond laser systems producing 500 mJ, 100 fs pulses at 10 Hz. This facility is built into a shipping container and includes a cleanroom housing the laser system, a separate section for the beam director optics with a retractable roof, and the environmental control equipment necessary to maintain stable operation. The laser system includes several innovations to improve the utility of the system for "in field" experiments. For example, this system utilizes a fiber laser oscillator and a monolithic chirped Bragg grating stretcher to improve system robustness/size and employs software to enable remote monitoring and system control. Uniquely, this facility incorporates a precision motion-controlled gimbal altitude-azimuth mount with a coudé path to enable aiming of the beam over a wide field of view. In addition to providing the ability to precisely aim at multiple targets, it is also possible to coordinate the beam with separate tracking/diagnostic sensing equipment as well as other laser systems. This mobile platform will be deployed at the Townes Institute Science and Technology Experimental Facility (TISTEF) located at the Kennedy Space Center in Florida, to utilize the 1-km secured laser propagation range and the wide array of meteorological instrumentation for atmospheric and turbulence characterization. This will provide significant new data on the propagation of high peak power ultrashort laser pulses and detailed information on the atmospheric conditions in a coastal semi-tropical environment.

  15. Determinants Of Housing Satisfaction In Residential Localities ...

    African Journals Online (AJOL)

    Six major dimensions or factors were produced as determinants of housing satisfaction in Uyo. These factors are social infrastructure, housing facilities, consumers goods availability, health and leisure water supply and security service factors. These six factors accounted for 80% of the variation within the data set. These six ...

  16. Decontamination and decommissioning of the Argonne National Laboratory East Area radioactively contaminated surplus facilities: Final report

    International Nuclear Information System (INIS)

    Kline, W.H.; Fassnacht, G.F.; Moe, H.J.

    1987-07-01

    ANL has decontaminated and decommissioned (D and D) seven radiologically contaminated surplus facilities at its Illinois site: a ''Hot'' Machine Shop (Building 17) and support facilities; Fan House No. 1 (Building 37), Fan House No. 2 (Building 38), the Pangborn Dust Collector (Building 41), and the Industrial Waste Treatment Plant (Building 34) for exhaust air from machining of radioactive materials. Also included were a Nuclear Materials Storage Vault (Building 16F) and a Nuclear Research Laboratory (Building 22). The D and D work involved dismantling of all process equipment and associated plumbing, ductwork, drain lines, etc. After radiation surveys, floor and wall coverings, suspended ceilings, room partitions, pipe, conduit and electrical gear were taken down as necessary. In addition, underground sewers were excavated. The grounds around each facility were also thoroughly surveyed. Contaminated materials and soil were packaged and shipped to a low-level waste burial site, while nonactive debris was buried in the ANL landfill. Clean, reusable items were saved, and clean metal scrap was sold for salvage. After the decommissioning work, each building was torn down and the site relandscaped. The project was completed in 1985, ahead of schedule, with substantial savings

  17. Interim Stabilization Equipment Essential and Support Drawing Plan

    International Nuclear Information System (INIS)

    HORNER, T.M.

    2000-01-01

    The purpose of this document is to list the Interim Stabilization equipment drawings that are classified as Essential or Support drawings. Essential Drawings are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment. [CHG 2000a]. Support Drawings are those drawings identified by the facility staff that further describe the design details of structures, systems or components shown on essential drawings. [CHG 2000a

  18. Current situation of the facilities, equipments and human resources in nuclear medicine in Argentina

    International Nuclear Information System (INIS)

    Chiliutti, Claudia A.

    2008-01-01

    The current situation of nuclear medicine in Argentina, taking into account the facilities, their equipment and human resources available is presented in this paper. A review and analysis of the equipment, including technical characteristics and a survey of the professionals and technicians of the area, was carried out. In Argentina, there are 266 centers of nuclear medicine distributed all over the country. The operating licenses are granted by the Nuclear Regulatory Authority (Autoridad Regulatoria Nuclear - ARN). Forty four percent of the installed equipment are SPECT of 1 or 2 heads and 39,4 % are gamma camera. Besides, there are eleven PET operating in Argentina. There are 416 nuclear medicine physicians with individual permit for diagnostic purposes and 50% of them has also individual permit for treatment purposes. With the purpose of analyzing the regional distribution of the available resources in nuclear medicine, the country was divided into 7 geographical regions: City of Buenos Aires, Province of Buenos Aires, Pampa, Cuyo, Northeast, Northwest and Patagonia. From the analysis of the gathered information it is possible to conclude that the nuclear medicine equipment as well as the personnel present an irregular distribution, with a major concentration in the City of Buenos Aires and Province of Buenos Aires. The Northeast region presents the lowest number of Nuclear Medicine centers and the Patagonia region has the lowest number of medicine nuclear physicians with individual permits. The number of SPECT and gamma cameras is 7,3 per million of inhabitants. The information about the available resources in nuclear medicine presented in this paper and its comparison with the international information available provide elements for a better planning of the future activities in the area not only for the operators but also from the regulatory point of view. (author)

  19. Performance monitoring of safeguards equipment

    International Nuclear Information System (INIS)

    Sirisena, K.; Peltoranta, M.; Goussarov, V.; Vodrazka, P.

    1999-01-01

    SGTCS is responsible for monitoring and reporting the performance of the SG equipment. Performance monitoring (PM) has been implemented in most important safeguards equipment operating unattended in nuclear facilities. Inspectors acquire equipment performance data in facilities. After inspection, the data package is submitted to SGTCS for processing and analysis. The performance data is used for identification of systems or components, which should be changed in the field and for identification of modules which, should be diagnosed at HQ in order to determine the cause of failure. Moreover, the performance data is used for preventive maintenance and spares distribution planning, and to provide statistics for official reports and management decision making. An important part of the performance monitoring is reporting. Equipment performance reports contain information about equipment inventory, utilization, failure types, failure distribution, and reliability. Trends in performance are given in graphical form in cases, where past data is available. Reliability estimates such as expected times between failures are provided. The automated reporting tools are obtainable through EMIS database application. (author)

  20. Congressional hearing reviews NSF major research and facilities projects

    Science.gov (United States)

    Showstack, Randy

    2012-03-01

    An 8 March congressional hearing about the U.S. National Science Foundation's Major Research Equipment and Facilities Construction (NSF MREFC) account focused on fiscal management and accountability of projects in that account and reviewed concerns raised by NSF's Office of Inspector General (OIG). NSF established the MREFC account in 1995 to better plan and manage investments in major equipment and facilities projects, which can cost from tens of millions to hundreds of millions of dollars, and the foundation has funded 17 MREFC projects since then. The Obama administration's proposed fiscal year (FY) 2013 budget includes funding for four MREFC projects: Advanced Laser Gravitational-Wave Observatory (AdvLIGO), Advanced Technology Solar Telescope (ATST), National Ecological Observatory (NEON), and Ocean Observatories Initiative (OOI). The hearing, held by a subcommittee of the House of Representatives' Committee on Science, Space, and Technology, reviewed management oversight throughout the life cycles of MREFC projects and concerns raised in recent OIG reports about the use of budget contingency funds. NSF's February 2012 manual called "Risk management guide for large facilities" states that cost contingency is "that portion of the project budget required to cover `known unknowns,'" such as planning and estimating errors and omissions, minor labor or material price fluctuations, and design developments and changes within the project scope. Committee members acknowledged measures that NSF has made to improve the MREFC oversight process, but they also urged the agency to continue to take steps to ensure better project management.

  1. Guideline to good practices for control and calibration of measuring and test equipment (M ampersand TE) at DOE nuclear facilities

    International Nuclear Information System (INIS)

    1993-03-01

    The purpose of the Guideline to Good Practices for Control and Calibration of Measuring and Test Equipment (M ampersand TE) at DOE Nuclear Facilities is to provide contractor maintenance organizations with information that may be used for the development and implementation of a rigorously controlled maintenance program directed at controlling and calibrating M ampersand TE used for maintenance tasks at DOE nuclear facilities. This document is intended to be an example guideline for the implementation of DOE Order 4330.4A, Maintenance Management Program, Chapter II, Element 11. DOE contractors should not feel obligated to adopt all parts of this guide. Rather, they should use the information contained herein as a guide for developing an M ampersand TE program applicable to their facility

  2. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  3. 46 CFR 108.653 - Helicopter facilities.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Helicopter facilities. 108.653 Section 108.653 Shipping... EQUIPMENT Equipment Markings and Instructions § 108.653 Helicopter facilities. (a) Each helicopter fueling facility must be marked adjacent to the fueling hose storage: “WARNING—HELICOPTER FUELING STATION—KEEP...

  4. The Mirror Fusion Test Facility cryogenic system: Performance, management approach, and present equipment status

    International Nuclear Information System (INIS)

    Slack, D.S.; Chronis, W.C.

    1987-01-01

    The cryogenic system for the Mirror Fusion Test Facility (MFTF) is a 14-kW, 4.35-K helium refrigeration system that proved to be highly successful and cost-effective. All operating objectives were met, while remaining within a few percent of initial cost and schedule plans. The management approach used in MFTF allowed decisions to be made quickly and effectively, and it helped keep costs down. Manpower levels, extent and type of industrial participation, key aspects of subcontractor specifications, and subcontractor interactions are reviewed, as well as highlights of the system tests, operation, and present equipment status. Organizations planning large, high-technology systems may benefit from this experience with the MFTF cryogenic system

  5. New Equipment Training Center-Satellite Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The ARDEC Satellite Facility is a 24-hour on-site military satellite transmission and downlink capability to Southwest Asia and all other military OCONUS and CONUS...

  6. RADIATION CONTROL DURING THE CONSTRUCTION OF THE OLYMPIC FACILITIES IN SOCHI CITY

    Directory of Open Access Journals (Sweden)

    I. K. Romanovich

    2015-01-01

    Full Text Available This paper presents data on the organization and results of the provision of the radiation safety in the period of preparation for the Winter Olympic and Paralympic games in Sochi, 2014. The following topics are overviewed in the paper: allocation of land plots for construction of the Olympic facilities; organization of the sanitary surveillance of the imported equipment, construction materials and designs for the construction of the Olympic facilities; putting the Olympic venues into operation. Dose rate of gamma radiation at all land plots, which were allocated for the construction of the Olympic facilities, conformed to the requirements of sanitary regulations. The average dose rate of gamma radiation was 0.11 μSv h-1 in the Coastal cluster and 0.14 μSv h-1 in the Mountain cluster. The radon fluence rate from the ground surface exceeded the prescribed limit of 80 mBq m-2 s-1 only at the land plot allocated for construction of the «House of receiving official delegations «Achipse» and the «House of receiving official delegations «Psekhako» in the Mountain cluster. The maximal value of 188 mBq m-2 s -1 was registered here. The buildings projects for this area included using radon protection measures, which were implemented during the construction.

  7. Radiation therapy sources, equipment and installations

    International Nuclear Information System (INIS)

    2011-03-01

    The safety code for Telegamma Therapy Equipment and Installations, (AERB/SC/MED-1) and safety code for Brachytherapy Sources, Equipment and Installations, (AERB/SC/MED-3) were issued by AERB in 1986 and 1988 respectively. These codes specified mandatory requirements for radiation therapy facilities, covering the entire spectrum of operations ranging from the setting up of a facility to its ultimate decommissioning, including procedures to be followed during emergency situations. The codes also stipulated requirements of personnel and their responsibilities. With the advent of new techniques and equipment such as 3D-conformal radiation therapy, intensity modulated radiation therapy, image guided radiation therapy, treatment planning system, stereotactic radiosurgery, stereotactic radiotherapy, portal imaging, integrated brachytherapy and endovascular brachytherapy during the last two decades, AERB desires that these codes be revised and merged into a single code titled Radiation Therapy Sources, Equipment, and Installations

  8. Application of slightly acidic electrolyzed water for inactivating microbes in a layer breeding house.

    Science.gov (United States)

    Hao, X X; Li, B M; Wang, C Y; Zhang, Q; Cao, W

    2013-10-01

    Lots of microorganisms exist in layer houses can cause bird diseases and worker health concerns. Spraying chemical disinfectants is an effective way to decontaminate pathogenic microorganisms in the air and on surfaces in poultry houses. Slightly acidic electrolyzed water (SAEW, pH 5.0-6.5) is an ideal, environmentally friendly broad-spectrum disinfectant to prevent and control bacterial or viral infection in layer farms. The purpose of this work was to investigate the cleaning effectiveness of SAEW for inactivating the microbes in layer houses. The effect of SAEW was evaluated by solid materials and surface disinfection in a hen house. Results indicate that SAEW with an available chlorine concentration of 250 mg/L, pH value of 6.19, and oxygen reduction potential of 974 mV inactivated 100% of bacteria and fungi in solid materials (dusts, feces, feather, and feed), which is more efficient than common chemical disinfectant such as benzalkonium chloride solution (1:1,000 vol/vol) and povidone-iodine solution (1:1,000 vol/vol). Also, it significantly reduced the microbes on the equipment or facility surfaces (P < 0.05), including floor, wall, feed trough, and water pipe surfaces. Moreover, SAEW effectively decreased the survival rates of Salmonella and Escherichia coli by 21 and 16 percentage points. In addition, spraying the target with tap water before disinfection plays an important role in spray disinfection.

  9. Facility Effluent Monitoring Plan for the 2724-W Protective Equipment Decontamination Facility

    International Nuclear Information System (INIS)

    Carter, G.J.

    1991-11-01

    A facility effluent monitoring plan is required by the US Department of Energy in DOE Order 5400.1* for any operations that involve hazardous materials and radioactive substances that could impact employee or public safety or the environment. This document is prepared using the specific guidelines identified in A Guide for Preparing Hanford Site Facility Effluent Monitoring Plans, WHC-EP-0438. This facility effluent monitoring plan assesses effluent monitoring systems and evaluates whether they are adequate to ensure the public health and safety as specified in applicable federal, state, and local requirements. This facility effluent monitoring plan is the first annual report. It shall ensure long-range integrity of the effluent monitoring systems by requiring an update whenever a new process or operation introduces new hazardous materials or significant radioactive materials. This document must be reviewed annually even if there are no operational changes, and it must be updates as a minimum every three years

  10. Sustainable Plus-energy Houses

    DEFF Research Database (Denmark)

    Kazanci, Ongun Berk; Olesen, Bjarne W.

    This study is an outcome of Elforsk, project number 344-060, Bæredygtige Energi-Plus huse (Sustainable plus-energy houses). The focus of this report is to document the approach and the results of different analyses concerning a plus-energy, single family house. The house was designed...... for an international student competition, Solar Decathlon Europe 2012 and after the competition it was used as a full-scale experimental facility for one year. During this period, different heating and cooling strategies were tested and the performance of the house regarding the thermal indoor environment and energy...... was monitored. This report is structured as follows. Chapter 1 presents the project and briefly explains the different phases of the project. The details of the house’s construction and its HVAC system are explained in Chapter 2, along with the energy efficiency measures and innovations. Chapter 3 introduces...

  11. Magnet measuring equipment of SC2

    CERN Multimedia

    CERN PhotoLab

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator.

  12. National Ignition Facility system design requirements conventional facilities SDR001

    International Nuclear Information System (INIS)

    Hands, J.

    1996-01-01

    This System Design Requirements (SDR) document specifies the functions to be performed and the minimum design requirements for the National Ignition Facility (NIF) site infrastructure and conventional facilities. These consist of the physical site and buildings necessary to house the laser, target chamber, target preparation areas, optics support and ancillary functions

  13. Communication grounding facility

    International Nuclear Information System (INIS)

    Lee, Gye Seong

    1998-06-01

    It is about communication grounding facility, which is made up twelve chapters. It includes general grounding with purpose, materials thermal insulating material, construction of grounding, super strength grounding method, grounding facility with grounding way and building of insulating, switched grounding with No. 1A and LCR, grounding facility of transmission line, wireless facility grounding, grounding facility in wireless base station, grounding of power facility, grounding low-tenton interior power wire, communication facility of railroad, install of arrester in apartment and house, install of arrester on introduction and earth conductivity and measurement with introduction and grounding resistance.

  14. Large-component handling equipment and its use

    International Nuclear Information System (INIS)

    Krieg, S.A.; Swannack, D.L.

    1983-01-01

    The Fast Flux Test Facility (FFTF) reactor systems have special requirements for component replacements during maintenance servicing. Replacement operations must address handling of equipment within shielded metal containers while maintaining an inert atmosphere to prevent reaction of sodium with air. Plant identification of a failed component results in selecting and assembling the maintenance cask and equipment transport system for transfer from the storage facility to the Reactor Containment Building (RCB). This includes a proper diameter and length cask, inert atmosphere control consoles, component lift fixture and support structure for interface with the facility area surrounding the component. This equipment is staged in modular groups in the Reactor Service Building for transfer through the equipment airlock to the containment interior. The failed component is generally prepared for replacement by installation of the special lifting fixture attachment. Assembly of the cask support structure is performed over the component position on the containment building operating floor. The cask and shroud from the reactor interface are inerted after all manual service connections and handling attachments are completed. The component is lifted from the reactor and into the cask interior through a floor valve which is then closed to isolate the component reactor port. The cask with sodium wetted component is transferred to a service/repair location, either within containment or outside, to the Maintenance Facility cleaning and repair area. The complete equipment and handling operations for replacement of a large reactor component are described

  15. Tritium monitoring equipments for animal experiment facilities

    International Nuclear Information System (INIS)

    Sato, Hiroo

    1980-01-01

    Animal experiment facilities using tritium are described with reference to laws and regulations concerning radiological safety. Usual breeding facilities and surrounding conditions at non-radioactive animal experiments are summarized on feasible and effective designs of tritium monitors. Characteristics and desirable arrangements of various kinds of tritium monitors such as ionization chambers, proportional counters and liquid scintillation detectors are discussed from the standpoint of monitoring for room, glove-box, stack, liquid waste and personnel. (J.P.N.)

  16. FUEL HANDLING FACILITY BACKUP CENTRAL COMMUNICATIONS ROOM SPACE REQUIREMENTS CALCULATION

    International Nuclear Information System (INIS)

    SZALEWSKI, B.

    2005-01-01

    The purpose of the Fuel Handling Facility Backup Central Communications Room Space Requirements Calculation is to determine a preliminary estimate of the space required to house the backup central communications room in the Fuel Handling Facility (FHF). This room provides backup communications capability to the primary communication systems located in the Central Control Center Facility. This calculation will help guide FHF designers in allocating adequate space for communications system equipment in the FHF. This is a preliminary calculation determining preliminary estimates based on the assumptions listed in Section 4. As such, there are currently no limitations on the use of this preliminary calculation. The calculations contained in this document were developed by Design and Engineering and are intended solely for the use of Design and Engineering in its work regarding the FHF Backup Central Communications Room Space Requirements. Yucca Mountain Project personnel from Design and Engineering should be consulted before the use of the calculations for purposes other than those stated herein or use by individuals other than authorized personnel in Design and Engineering

  17. 40 CFR 63.424 - Standards: Equipment leaks.

    Science.gov (United States)

    2010-07-01

    ....424 Standards: Equipment leaks. (a) Each owner or operator of a bulk gasoline terminal or pipeline... location of all equipment in gasoline service at the facility. (c) Each detection of a liquid or vapor leak... replacement of leaking equipment shall be completed within 15 calendar days after detection of each leak...

  18. Separations canyon decontamination facilities

    International Nuclear Information System (INIS)

    Hershey, J.H.

    1975-01-01

    Highly radioactive process equipment is decontaminated at the Savannah River Plant in specially equipped areas of the separations canyon building so that direct mechanical repairs or alterations can be made. Using these facilities it is possible to decontaminate and repair equipment such as 10- x 11-ft storage tanks, 8- x 8-ft batch evaporator pots and columns, 40-in. Bird centrifuges, canyon pumps and agitators, and various canyon piping systems or ''jumpers.'' For example, centrifuge or evaporator pots can be decontaminated and rebuilt for about 60 percent of the 1974 replacement cost. The combined facilities can decontaminate and repair 6 to 10 pieces of major equipment per year. Decontamination time varies with type of equipment and radioactivity levels encountered

  19. Separations canyon decontamination facilities

    International Nuclear Information System (INIS)

    Hershey, J.H.

    1975-05-01

    Highly radioactive process equipment is decontaminated at the Savannah River Plant in specially equipped areas of the separations canyon buildings so that direct mechanical repairs or alterations can be made. Using these facilities it is possible to decontaminate and repair equipment such as 10- x 11-ft storage tanks, 8- x 8-ft batch evaporator pots and columns, 40-in. Bird centrifuges, canyon pumps and agitators, and various canyon piping systems or ''jumpers.'' For example, centrifuge or evaporator pots can be decontaminated and rebuilt for about 60 percent of the 1974 replacement cost. The combined facilities can decontaminate and repair 6 to 10 pieces of major equipment per year. Decontamination time varies with type of equipment and radioactivity levels encountered. (U.S.)

  20. Development of nuclear equipment qualification technology

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Heon O; Kim, Wu Hyun; Kim, Jin Wuk; Kim, Jeong Hyun; Lee, Jeong Kyu; Kim, Yong Han; Jeong, Hang Keun [Korea Institute of Machinery and Materials, Taejon (Korea)

    1999-03-01

    In order to enhance testing and evaluation technologies, which is one of the main works of the Chanwon branch of KIMM(Korea Institute of Machinery and Materials), in addition to the present work scope of the testing and evaluation in the industrial facilities such as petroleum and chemical, plants, the qualification technologies of the equipments important to safety used in the key industrial facilities such as nuclear power plants should be localized: Equipments for testing and evaluation is to be set up and the related technologies must be developed. In the first year of this study, of vibration aging qualification technologies of equipments important to safety used in nuclear power plants have been performed. (author). 27 refs., 81 figs., 17 tabs.

  1. Catalog of physical protection equipment. Book 3: Volume VI. Automated response components

    International Nuclear Information System (INIS)

    Haberman, W.

    1977-06-01

    The Catalog of Physical Protection Equipment presents information on currently available physical protection equipment that could be employed to safeguard special nuclear materials. The primary source of information was the responses of manufacturers and vendors to requests for literature and data. All equipment listed in the Catalog has been screened in accordance with the following general criteria, and only items meeting one or more of these criteria have been included: (1) equipment is commercially available off-the-shelf; (2) equipment is currently in use at commercial nuclear facilities licensed or to be licensed by NRC; (3) equipment is applicable for use at nuclear facilities licensed or to be licensed by NRC; (4) equipment can operate in the environmental conditions present at nuclear facilities; and (5) equipment is not designed solely or primarily for residential use. The final report describes the methodology and rationale used to create the Catalog of Physical Protection Equipment

  2. Requirements of on-site facilities

    International Nuclear Information System (INIS)

    Burchardt, H.

    1977-01-01

    1) Requirements of on-site facilities: a) brief description of supplying the site with electricity and water; communication facilities, b) necessary facilities for containment and pipeline installation, c) necessary facilities for storage, safety, accommodation of personnel, housing; workshops; 2) Site management: a) Organisation schedules for 'turn-key-jobs' and 'single commission', b) Duties of the supervisory staff. (orig.) [de

  3. Equipment, components and production of x-ray

    International Nuclear Information System (INIS)

    Idris Besar

    2004-01-01

    The contents of this chapter are follows - Equipment, Components and Production of x-Ray: x-ray system, generator, control panel. x-ray tube, cathode, anode, envelope, housing, collimator, other components, x-ray production, Bremsstrahlung x-ray, characteristic x-ray, heat production

  4. Remote operation and maintenance demonstration facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D.; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock up various hot cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups

  5. Administrative and financial responsibilities for sheltered housing for mentally ill and handicapped persons in Germany and its impact on housing supply.

    Science.gov (United States)

    Bramesfeld, Anke; Holler, Gerhard

    2005-06-01

    The integration of mentally ill and handicapped persons in the society requires the availability of various forms of sheltered housing in the community, most important ambulatory (supported) housing facilities. In Germany the administrative and financial responsibility for sheltered housing for mental ill and handicapped persons is usually assigned to two authorities: the welfare authorities at Lander (state) level are responsible for hostels, the welfare authorities on community and district level are responsible for ambulatory housing. However some Lander have distributed these responsibilities differently and other Lander offer subsidy programmes to promote the implementation of ambulatory housing. To evaluate the different modes of distributing the responsibilities for administration and financing of sheltered housing for their impact on the supply with ambulatory and stationary housing in the 16 German Lander. (1) Analysis of the practise of distributing the responsibilities for housing between Lander and community welfare-authorities in the 16 Lander. Analysis of the subsidy programmes in the Lander that aim to promote the implementation of ambulatory housing. (2) Assessment of the capacities in housing for mentally ill and handicapped persons in the Lander. (3) Comparing (1) and (2). Lander that have the responsibilities for ambulatory housing and for hostels organised on the same authority-level, offer generally more housing in ambulatory facilities and less in hostels than Lander that do not. However, three Lander, despite having all responsibilities for housing at one authority level, provide accommodation for mentally ill and handicapped persons predominantly in hostels. There are so far no indications whether it would be more favourable to have a unique authority for housing based on Lander or on community level. Subsidy programmes to promote the implementation of supported housing are successful if they sponsor at least 50% of costs and if they exist

  6. Projectile Demilitarization Facilities

    Data.gov (United States)

    Federal Laboratory Consortium — The Projectile Wash Out Facility is US Army Ammunition Peculiar Equipment (APE 1300). It is a pilot scale wash out facility that uses high pressure water and steam...

  7. Prize-winning energy conservation house equipped with air collectors at Bad Vilbel

    Energy Technology Data Exchange (ETDEWEB)

    Urbanek, A.

    An energy conservation house is the winner out of a total of 60 designs and is displayed at the prefabricated-house exhibition at Bad Vilbel. Similar to Socrates' building in antiquity, this house constitutes a triangle both perpendicularly and horizontally opening its largest possible surface to the South. Any 'residual heat' needed for the Northern roof planted over, is supplied by the air collectors either directly or by means of a high-performance heat pump via heating of the controlled feed air through a novel air floor heating installation while removing energy, too, from the exhaust air through heat recovery. In a survey supported by photos of models and buildings, lay-out plans and connector diagrams of energy supply, technical details of the heat protection concept (aerated concrete for walls, ceilings, roofing structures) and the energy concept with air collectors are described along with a discussion of heat pump operation, the novel air floor heating system and the solar cycle control system. Every room has a miniature heat exchanger allocated in the central unit so that re-heated air can be demanded via the separate room thermostat depending on reflow-air temperature.

  8. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  9. Market Potential for Residential Biomass Heating Equipment: Stochastic and Econometric Assessments

    OpenAIRE

    Adee Athiyaman

    2015-01-01

    This paper provides estimates of market potential for biomass-residential-heating equipment in the US: that is, the greatest amount of biomass-residential-heating equipment that can be sold by the industry. The author's analysis is limited to biomass equipment used most to heat the housing unit. Assuming that households equipped with 10+ year old primary heating devices will replace rather than repair the devices he predicts that approximately 1.4 million units of residential home heating equ...

  10. Planning and equipping of the Petrovaradin Fortress lower town for touristic purposes

    Directory of Open Access Journals (Sweden)

    Garača Vuk

    2012-01-01

    Full Text Available Petrovaradin Fortress belongs into the category of unique cultural and historical objects of fortification engineering. According to the Detailed Urban Plan of the Petrovaradin Fortress and the General Urban Plan of Novi Sad, the priorities in the use of this area should contain cultural, tourist and catering facilities, with a goal of the Fortress becoming a venue and a center of cultural tourism in the region. The Fortress consists of several spatial entities, where the Lower Town, with its unique baroque edifice, is an entity that should entirely be developed for tourist and catering facilities. This paper deals with the aspect of tourism development of the Lower Town by the way of its planning, using and managing, and it also lists the temporary problems. The aim of this paper is to show the potentials of this area in the development of cultural and tourist attractions, thanks to its cultural and historical heritage, as well as to present the possible solutions for the tourist catering development of this area. The paper proposes a possible tourist decoration and furnishing of the space with the necessary urban equipment, opening of new museums and galleries, as well as converting the objects from housing facilities to the catering, craftsman or commercial function.

  11. 9 CFR 3.25 - Facilities, general.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Facilities, general. 3.25 Section 3.25... Pigs and Hamsters Facilities and Operating Standards § 3.25 Facilities, general. (a) Structural strength. Indoor and outdoor housing facilities for guinea pigs or hamsters shall be structurally sound and...

  12. Magnetics Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Magnetics Research Facility houses three Helmholtz coils that generate magnetic fields in three perpendicular directions to balance the earth's magnetic field....

  13. 24 CFR 92.254 - Qualification as affordable housing: Homeownership.

    Science.gov (United States)

    2010-04-01

    ... residents, percentage of owner-occupants) in relation to housing and incomes in the housing market area. An... public facilities and services. If a participating jurisdiction in preparing a neighborhood revitalization strategy under § 91.215(e)(2) of its consolidated plan or Empowerment Zone or Enterprise Community...

  14. Preliminary design report for prototypical spent nuclear fuel rod consolidation equipment

    International Nuclear Information System (INIS)

    Judson, B.F.; Maillet, J.; O'Neill, G.L.; Tsitsichvili, J.; Tucoulat, D.

    1986-12-01

    The purpose of the Prototypical Consolidation Demonstration Project (PCDP) is to develop and demonstrate the equipment system that will be used to consolidate the bulk of the spent nuclear fuel generated in the United States prior to its placement in a geological repository. The equipment must thus be capable of operating on a routine production basis over a long period of time with stringent requirements for safety, reliability, productivity and cost-effectiveness. Four phases are planned for the PCDP. Phase 1 is the Preliminary Design of generic consolidation equipment that could be installed at a Monitored Retrievable Storage (MRS) facility or in the Receiving ampersand Handling Facility at a geologic repository site. Phase 2 will be the Final Design and preparation of procurement packages for the equipment in a configuration capable of being installed and tested in a special enclosure within the TAN Hot Shop at DOE's Idaho National Engineering Laboratory. In Phase 3 the equipment will be fabricated and then tested with mock fuel elements in a contractor's facility. Finally, in Phase 4 the equipment will be moved to the TAN facility for demonstration operation with irradiated spent fuel elements. 55 figs., 15 tabs

  15. Hardware Development Process for Human Research Facility Applications

    Science.gov (United States)

    Bauer, Liz

    2000-01-01

    The simple goal of the Human Research Facility (HRF) is to conduct human research experiments on the International Space Station (ISS) astronauts during long-duration missions. This is accomplished by providing integration and operation of the necessary hardware and software capabilities. A typical hardware development flow consists of five stages: functional inputs and requirements definition, market research, design life cycle through hardware delivery, crew training, and mission support. The purpose of this presentation is to guide the audience through the early hardware development process: requirement definition through selecting a development path. Specific HRF equipment is used to illustrate the hardware development paths. The source of hardware requirements is the science community and HRF program. The HRF Science Working Group, consisting of SCientists from various medical disciplines, defined a basic set of equipment with functional requirements. This established the performance requirements of the hardware. HRF program requirements focus on making the hardware safe and operational in a space environment. This includes structural, thermal, human factors, and material requirements. Science and HRF program requirements are defined in a hardware requirements document which includes verification methods. Once the hardware is fabricated, requirements are verified by inspection, test, analysis, or demonstration. All data is compiled and reviewed to certify the hardware for flight. Obviously, the basis for all hardware development activities is requirement definition. Full and complete requirement definition is ideal prior to initiating the hardware development. However, this is generally not the case, but the hardware team typically has functional inputs as a guide. The first step is for engineers to conduct market research based on the functional inputs provided by scientists. CommerCially available products are evaluated against the science requirements as

  16. Remote Operation and Maintenance Demonstration Facility at ORNL

    International Nuclear Information System (INIS)

    Harvey, H.W.; Floyd, S.D; Kuban, D.P.; Singletary, B.H.; Stradley, J.G.

    1978-01-01

    The Remote Operation and Maintenance Facility is a versatile facility arranged to mock-up various hot-cell configurations. Modular units of simulated shielding and viewing windows were built to provide flexibility in arrangement. The facility is fully equipped with hoists, manipulators, television, and the other basic equipment and services necessary to provide capability for both remote operation and maintenance of several selected functional process equipment groups. 6 figures

  17. The suitability and installation of technological equipment when upgrading existing facilities

    Directory of Open Access Journals (Sweden)

    Ladnushkin A. A.

    2016-03-01

    Full Text Available to date, a large number of Russian companies in diverse and various industries, has old equipment and requires modernization of the technological process due to the growth of scientific and technological progress. In order to achieve goals when upgrading is considered such an important aspect as the readiness of the new equipment installation. Mounting hardware suitability describes the suitability and readiness of equipment for efficient Assembly at the user. Replacement of technological equipment requires large volumes of works on installation and dismantling, in the absence of the building has its own lifting mechanisms require large financial and labor costs. One of possible methods for replacement of process equipment is the technology of without crane installation allows us to carry out work in existing space planning. Today is the question of the necessity of development and introduction of new technological production methods and fixtures tooling in which it is possible to conduct installation and dismantling of technological equipment in the operating production process.

  18. Problem of relocation of citizens from unfit housing facilities exemplified by the regions

    Directory of Open Access Journals (Sweden)

    Unacheva Lyana Ruslanovna

    2016-12-01

    Full Text Available The problems of relocation of citizens from unfit and slum dwellings are considered. Residential property market analysis illustrating a house construction attenuation was performed. The problems of provision of quality and equivalent housing are touched, and the reasons for inaccessibility thereof are illustrated. Measures taken for control of quality of the provided houses are considered. Attention is drawn to development problems of the North Caucasus as an example of one of the problematic regions. For the system solution of the erected housing quality issue it is planned to introduce this year the obligation for a self-regulatory organization to have a permit for design and construction of low-rise buildings. It is necessary to focus on the quality of housing, on elimination of corruption, improvement of work of the body for the housing stock price formation, and the local self-governing authorities. The carried-out measures with due attention of regions’ authorities will enable to keep priority rates of the unfit dwelling liquidation and fulfil the general tasks set by the President and the RF Government.

  19. Environmental Toxicology Research Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Fully-equipped facilities for environmental toxicology researchThe Environmental Toxicology Research Facility (ETRF) located in Vicksburg, MS provides over 8,200 ft...

  20. H.R. 3521: Nuclear Facilities Occupational Safety Improvement Act of 1989. Introduced in the House of Representatives, One Hundredth First Congress, First Session, October 25, 1989

    International Nuclear Information System (INIS)

    Anon.

    1989-01-01

    Bill H.R.3521 was introduced in the House of Representatives of the United States on October 25, 1989. The purpose of this Act and the amendments made by this Act are to improve and enforce standards for employee health and safety at Department of Energy nuclear facilities. Congress finds that worker health and safety at Department of Energy nuclear facilities could be made substantially safer by applying standards developed by experts in the field of occupational health and safety. A section-by-section analysis makes up most of the report with emphasis on the following: application of OSHA to DOE nuclear facilities; cooperation with inspections and investigations; transfer and allocation of appropriations and personnel; worker training requirements; performance of NIOSH functions at DOE nuclear facilities; medical examinations of employees; and labor-management health and safety committees at DOE nuclear facilities

  1. Ideal energy self-sufficient bioclimatic house

    Energy Technology Data Exchange (ETDEWEB)

    Talamo, C.

    1990-04-01

    This paper points out some of the interesting architectural features of a conceptual house being designed to be self-sufficient relative to the use of conventional energy sources. Brief notes are given on the following special design characteristics: the house's orientation and form - essentially a V - shaped two storey design with an orientation such as to maximize the surface area exposed to winter insolation; its special low emissivity glazing equipped with nightfall insulating screens; the adoption of maximized insulation, in which case cost benefits were assessed based on amortization over the entire life span of the house; hybrid space heating and ventilation systems involving the integration of pumps and ventilators for air circulation, and the use of a varied mix of active and passive solar heating and cooling systems.

  2. The Assessment of Housing Situation among Students in the ...

    African Journals Online (AJOL)

    The student housing has been a major area of concern with increasing student population as a result of increasing interest in the higher institutions of learning over the years. The rise in population which has led to various problematic conditions of student housing which range from inadequate infrastructure facilities to ...

  3. CONTAMINATED PROCESS EQUIPMENT REMOVAL FOR THE DECOMMISSIONG AND DECONTAMINATION OF THE 232-Z CONTAMINATED WASTE RECOVERY PROCESS FACILITY AT THE PLUTONIUM FINISHING PLANT

    International Nuclear Information System (INIS)

    HOPKINS, A.M.; MINETTE, M.J.; KLOS, D.B.

    2007-01-01

    This paper describes the unique challenges encountered and subsequent resolutions to accomplish the deactivation and decontamination of a plutonium ash contaminated building. The 232-Z Contaminated Waste Recovery Process Facility at the Plutonium Finishing Plant was used to recover plutonium from process wastes such as rags, gloves, containers and other items by incinerating the items and dissolving the resulting ash. The incineration process resulted in a light-weight plutonium ash residue that was highly mobile in air. This light-weight ash coated the incinerator's process equipment, which included gloveboxes, blowers, filters, furnaces, ducts, and filter boxes. Significant airborne contamination (over 1 million derived air concentration hours [DAC]) was found in the scrubber cell of the facility. Over 1300 grams of plutonium held up in the process equipment and attached to the walls had to be removed, packaged and disposed. This ash had to be removed before demolition of the building could take place

  4. Automatization of welding for nuclear power equipments and facilities

    International Nuclear Information System (INIS)

    Tamai, Yasumasa; Matsumoto, Teruo; Koyama, Takaichi

    1980-01-01

    For the requirement of high reliability in the construction of nuclear power plants and the reduction of radiation exposure in the modefying works of existing plants, the automation and remote operation of welding have increased their necessity. In this paper, the present state of the automation of welding for making machines, equipments and pipings for nuclear power plants in Hitachi Ltd. is described, and the aim of developing the automation, the features of the equipments and the state of application to actual plants are introduced, centering around the automation of welding for large structures such as reactor containment vessels and the remote type automatic welding system for pipings. By these automations, the large outcomes were obtained in the improvement of welding quality required for the machines and equipments for atomic energy. Moreover, the conspicuous results were also obtained in case of the peculiar works to nuclear power plants, in which the reduction of the radiation exposure related to human bodies and the welding of high quality are demanded. The present state of the automation of welding for nuclear installations in Hitachi Ltd., the development of automatic welding equipments and the present state of application to actual plants, and the development and application of the automatic pipe working machine for reducing radiation exposure are explained. (Kako, I.)

  5. The application of SQUG to non-reactor facilities

    International Nuclear Information System (INIS)

    Hoskins, R.S.

    1993-01-01

    DOE Order 6430.1A mandates that facilities be designed and constructed to withstand Natural Phenomena Hazards in accordance with their hazard level. DOE has a program in progress to evaluate and then upgrade many of their existing medium and high hazard facilities where release of hazardous materials to the environment is a concern. This paper addresses a useful methodology which has been applied by SRS to evaluate and qualify equipment to withstand the ravenousness of earthquakes. The Seismic Qualification Utility Group was formed by a group of Electric Power Utilities whose Nuclear Power Plants predated the 10CFR50 Environmental design requirements to develop a methodology to evaluate and upgrade their operating plants against seismic events in answer to NRC generic letter USI-A46. SRS participated in this organization, since it operated reactors designed and constructed in the 1950's, and the application of the SQUG methodology was obvious. Nuclear Material Processing and Handling (NMPH) facilities utilize equipment similar to the nuclear industry, in fact, to industry in general. Consequently, it made sense to apply SQUG methodology to evaluate and qualify equipment in NMPH facilities against earthquakes. In order to utilize SQUG methodology, some changes are required since the goal of safe shutdown of a NMPH facility differs from a nuclear reactor, consequently, the generation of a Safe Shutdown Equipment List is modified by the requirements of each particular facility. Once the Safety Class Equipment List is developed denoting the qualification requirement for each piece of equipment, the SQUG walk downs can be performed as they are in commercial nuclear plants. SQUG methodology offers a cost effective approach for the seismic qualification of equipment at existing DOE NMPH facilities. SQUG cannot be applied to new or unique equipment since the experience database doesn't contain the needed information

  6. Guideline for design and construction radiation monitoring equipments for Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Miyabe, Kenjiro; Ninomiya, Kazushige; Jin, Kazumi; Morifuji, Masayuki; Nemoto, Kazuhiko; Sato, Akira; Kawai, Keiichi

    1999-12-01

    Various kind of radiation monitoring equipment are used in radiation controlled area at each facility of Tokai reprocessing plant. These equipments have been designed and constructed based on the users requirements, and permitted by governmental regulation office. And, design has been carried out in consideration of the adoption of the new technology and our operational experience. Then, it has been used effectively for the radiation control of the facilities. This report summarizes the technical requirements that should be taken into consideration in the design and installation of radiation monitoring equipments. These requirements are fundamentally applicable when the equipments of the new facilities will be designed or the present instruments will be replaced. (author)

  7. Ammonia emissions in tunnel-ventilated broiler houses

    Directory of Open Access Journals (Sweden)

    KAO Lima

    2011-12-01

    Full Text Available Gas production in broiler houses and their emissions are closely related to the microclimate established inside the house according to air temperature, humidity, and velocity. Therefore, the internal house environment is influenced by building typology and ventilation system. The objective of the present study was to evaluate ammonia emission rates in broiler houses equipped with different ventilation systems (negative or positive pressure and litter conditions (new or built-up. The environment of six commercial broiler houses was evaluated internal and external NH3 concentrations. Ventilation rates were recorded to estimate ammonia emission rates. The efficiency of circulation and exhaust fans was assessed, and higher ventilation rates were determined in negative-pressure houses due to the higher flow of the fans. Houses with new litter increased ammonia emission rates along the rearing period, indicating the relationship between gas emissions, bird age and ventilation rates, and presented a typical curve of NH3 emission increase. Negative-pressure houses with built-up litter presented higher emission rates during the first rearing week due to the high NH3 concentration during the brooding period, when the ventilation rates required to maintain chick thermal comfort are low. Although the results of the present study indicate an advantage of the positive-pressure systems as to gas emissions, further research is needed reduce gas emissions in broiler houses with negative-pressure systems.

  8. Liquid Metal Fast Breeder Reactor plant maintenance and equipment design

    International Nuclear Information System (INIS)

    Swannack, D.L.

    1982-01-01

    This paper provides a summary of maintenance equipment considerations and actual plant handling experiences from operation of a sodium-cooled reactor, the Fast Flux Test Facility (FFTF). Equipment areas relating to design, repair techniques, in-cell handling, logistics and facility services are discussed. Plant design must make provisions for handling and replacement of components within containment or allow for transport to an ex-containment area for repair. The modular cask assemblies and transporter systems developed for FFTF can service major plant components as well as smaller units. The plant and equipment designs for the Clinch River Breeder Reactor (CRBR) plant have been patterned after successful FFTF equipment

  9. DUPIC facility engineering

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J S; Choi, J W; Go, W I; Kim, H D; Song, K C; Jeong, I H; Park, H S; Im, C S; Lee, H M; Moon, K H; Hong, K P; Lee, K S; Suh, K S; Kim, E K; Min, D K; Lee, J C; Chun, Y B; Paik, S Y; Lee, E P; Yoo, G S; Kim, Y S; Park, J C

    1997-09-01

    In the early stage of the project, a comprehensive survey was conducted to identify the feasibility of using available facilities and of interface between those facilities. It was found out that the shielded cell M6 interface between those facilities. It was found out that the shielded cell M6 of IMEF could be used for the main process experiments of DUPIC fuel fabrication in regard to space adequacy, material flow, equipment layout, etc. Based on such examination, a suitable adapter system for material transfer around the M6 cell was engineered. Regarding the PIEF facility, where spent PWR fuel assemblies are stored in an annex pool, disassembly devices in the pool are retrofitted and spent fuel rod cutting and shipping system to the IMEF are designed and built. For acquisition of casks for radioactive material transport between the facilities, some adaptive refurbishment was applied to the available cask (Padirac) based on extensive analysis on safety requirements. A mockup test facility was newly acquired for remote test of DUPIC fuel fabrication process equipment prior to installation in the M6 cell of the IMEF facility. (author). 157 refs., 57 tabs., 65 figs.

  10. DUPIC facility engineering

    International Nuclear Information System (INIS)

    Lee, J. S.; Choi, J. W.; Go, W. I.; Kim, H. D.; Song, K. C.; Jeong, I. H.; Park, H. S.; Im, C. S.; Lee, H. M.; Moon, K. H.; Hong, K. P.; Lee, K. S.; Suh, K. S.; Kim, E. K.; Min, D. K.; Lee, J. C.; Chun, Y. B.; Paik, S. Y.; Lee, E. P.; Yoo, G. S.; Kim, Y. S.; Park, J. C.

    1997-09-01

    In the early stage of the project, a comprehensive survey was conducted to identify the feasibility of using available facilities and of interface between those facilities. It was found out that the shielded cell M6 interface between those facilities. It was found out that the shielded cell M6 of IMEF could be used for the main process experiments of DUPIC fuel fabrication in regard to space adequacy, material flow, equipment layout, etc. Based on such examination, a suitable adapter system for material transfer around the M6 cell was engineered. Regarding the PIEF facility, where spent PWR fuel assemblies are stored in an annex pool, disassembly devices in the pool are retrofitted and spent fuel rod cutting and shipping system to the IMEF are designed and built. For acquisition of casks for radioactive material transport between the facilities, some adaptive refurbishment was applied to the available cask (Padirac) based on extensive analysis on safety requirements. A mockup test facility was newly acquired for remote test of DUPIC fuel fabrication process equipment prior to installation in the M6 cell of the IMEF facility. (author). 157 refs., 57 tabs., 65 figs

  11. 33 CFR 106.255 - Security systems and equipment maintenance.

    Science.gov (United States)

    2010-07-01

    ... 33 Navigation and Navigable Waters 1 2010-07-01 2010-07-01 false Security systems and equipment... Shelf (OCS) Facility Security Requirements § 106.255 Security systems and equipment maintenance. (a) Security systems and equipment must be in good working order and inspected, tested, calibrated, and...

  12. Magnet measuring equipment of SC2

    CERN Multimedia

    1974-01-01

    Checking the positioning of the magnet measuring equipment installed between the poles of SC2. The steel structure in front of the magnet is designed to house the rotary condenser and to shield it from the stray magnetic field of the accelerator. On the left, Marinus van Gulik. (See Photo Archive 7402005 and Annual Report 1974, p. 44.)

  13. OPEN AIR DEMOLITION OF FACILITIES HIGHLY CONTAMINATED WITH PLUTONIUM

    International Nuclear Information System (INIS)

    LLOYD, E.R.

    2007-01-01

    The demolition of highly contaminated plutonium buildings usually is a long and expensive process that involves decontaminating the building to near free- release standards and then using conventional methods to remove the structure. It doesn't, however, have to be that way. Fluor has torn down buildings highly contaminated with plutonium without excessive decontamination. By removing the select source term and fixing the remaining contamination on the walls, ceilings, floors, and equipment surfaces; open-air demolition is not only feasible, but it can be done cheaper, better (safer), and faster. Open-air demolition techniques were used to demolish two highly contaminated buildings to slab-on-grade. These facilities on the Department of Energy's Hanford Site were located in, or very near, compounds of operating nuclear facilities that housed hundreds of people working on a daily basis. To keep the facilities operating and the personnel safe, the projects had to be creative in demolishing the structures. Several key techniques were used to control contamination and keep it within the confines of the demolition area: spraying fixatives before demolition; applying fixative and misting with a fine spray of water as the buildings were being taken down; and demolishing the buildings in a controlled and methodical manner. In addition, detailed air-dispersion modeling was done to establish necessary building and meteorological conditions and to confirm the adequacy of the proposed methods. Both demolition projects were accomplished without any spread of contamination outside the modest buffer areas established for contamination control. Furthermore, personnel exposure to radiological and physical hazards was significantly reduced by using heavy equipment rather than ''hands on'' techniques

  14. Housing aspiration in an informal urban settlement: A case study

    Directory of Open Access Journals (Sweden)

    Akunnaya P. OPOKO

    2015-11-01

    Full Text Available Housing aspiration is an important aspect of housing market analysis. However, there is a paucity of empirical research on housing aspiration among residents in informal settlements in developing countries. This study therefore investigated housing aspiration among the residents of Ayobo, Lagos, Nigeria. A cross-sectional survey of 1,151 households in Ayobo was conducted using a structured questionnaire as the data-collection instrument. The data were analysed using descriptive statistical and categorical regression analyses. The results show that a majority of the respondents were low-income earners living in rented and rooming-house types of accommodation. Around 73% of them expressed an intention to move to another residence, and 56% of this category of respondents intend to move into self-contained flats. The reasons for the planned relocation include poor condition of their present dwellings, changes in tenure status and household size, and the desire for exclusive use of facilities in their homes. In addition to these reasons, the waste-disposal method, sharing facilities, employment, and age and marital status of the residents emerged as the strongest predictors of housing aspiration among the respondents in the survey. This implies that, in order to meet the housing preferences and aspirations of residents in informal urban settlements in Nigeria, housing developers need to give adequate attention to the marital, age, employment and tenure status of the residents and place emphasis on developing affordable single-family houses and block of flats, as well as strategies for improving access to basic social amenities and services.

  15. Public Housing: A Tailored Approach to Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, Jordan [Advanced Residential Integrated Energy Solutions (ARIES) Collaborative, New York, NY (United States); Conlin, Francis [Advanced Residential Integrated Energy Solutions (ARIES) Collaborative, New York, NY (United States); Podorson, David [Advanced Residential Integrated Energy Solutions (ARIES) Collaborative, New York, NY (United States); Alaigh, Kunal [Advanced Residential Integrated Energy Solutions (ARIES) Collaborative, New York, NY (United States)

    2014-06-01

    More than 1 million HUD-supported public housing units provide rental housing for eligible low-income families across the country. A survey of over 100 public housing authorities (PHAs) across the country indicated that there is a high level of interest in developing low-cost solutions that improve energy efficiency and can be seamlessly included in the refurbishment process. Further, PHAs, have incentives (both internal and external) to reduce utility bills. ARIES worked with two PHAs to develop packages of energy efficiency retrofit measures the PHAs can cost effectively implement with their own staffs in the normal course of housing operations when units are refurbished between occupancies. The energy efficiency turnover protocols emphasized air infiltration reduction, duct sealing and measures that improve equipment efficiency. ARIES documented implementation 10 ten housing units. Total source energy consumption savings was estimated at 6%-10% based on BEopt modeling with a simple payback of 1.7 to 2.2 years. At typical housing unit turnover rates, these measures could impact hundreds of thousands of units per year nationally.

  16. Containment and Surveillance Equipment Compendium

    International Nuclear Information System (INIS)

    Luetters, F.O.

    1980-02-01

    The Containment and Surveillance Equipment Compendium contains information sections describing the application and status of seals, optical surveillance systems, and monitors for international safeguards systems. The Compendium is a collection of information on equipment in use (generally by the IAEA) or under development in the US in diverse programs being conducted at numerous facilities under different sponsors. The Compendium establishes a baseline for the status and applications of C/S equipment and is a tool to assist in the planning of future C/S hardware development activities. The Appendix contains design concepts which can be developed to meet future goals

  17. 33 CFR 154.545 - Discharge containment equipment.

    Science.gov (United States)

    2010-07-01

    ... (CONTINUED) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Equipment Requirements § 154... chapter may be utilized in the planning requirements of subpart F and subpart H of this part. [CGD 75-124... material and equipment to contain any oil or hazardous material discharged on the water from operations at...

  18. The Burning Plasma Experiment conventional facilities

    International Nuclear Information System (INIS)

    Commander, J.C.

    1991-01-01

    The Burning Program Plasma Experiment (BPX) is phased to start construction of conventional facilities in July 1994, in conjunction with the conclusion of the Tokamak Fusion Test Reactor (TFTR) project. This paper deals with the conceptual design of the BPX Conventional Facilities, for which Functional and Operational Requirements (F ampersand ORs) were developed. Existing TFTR buildings and utilities will be adapted and used to satisfy the BPX Project F ampersand ORs to the maximum extent possible. However, new conventional facilities will be required to support the BPX project. These facilities include: The BPX building; Site improvements and utilities; the Field Coil Power Conversion (FCPC) building; the TFTR modifications; the Motor Generation (MG) building; Liquid Nitrogen (LN 2 ) building; and the associated Instrumentation and Control (I ampersand C) systems. The BPX building will provide for safe and efficient shielding, housing, operation, handling, maintenance and decontamination of the BPX and its support systems. Site improvements and utilities will feature a utility tunnel which will provide a space for utility services--including pulse power duct banks and liquid nitrogen coolant lines. The FCPC building will house eight additional power supplied for the Toroidal Field (TF) coils. The MG building will house the two MG sets larger than the existing TFTR MG sets. This paper also addresses the conventional facility cost estimating methodology and the rationale for the construction schedule developed. 6 figs., 1 tab

  19. Design-only conceptual design report for pit disassembly and conversion facility. Rev 0

    International Nuclear Information System (INIS)

    Zygmunt, S.; Christensen, L.; Richardson, C.

    1997-01-01

    This design-only conceptual design report (DOCDR) was prepared to support a funding request by the Department of Energy (DOE)-Office of Fissile Material Disposition (OFMD) for engineering design of the Pit Disassembly and Conversion Facility (PDCF) Project No. 99-D-141. The PDCF will be used to disassemble the nation's inventory of surplus nuclear weapons pits and convert the plutonium recovered from those pits into a form suitable for storage, international inspection, and final disposition. The PDCF is a complex consisting of a hardened building that will contain the plutonium processes in a safe and secure manner, and conventional buildings and structures that will house support personnel, systems, and equipment. The PDCF uses the Advanced Recovery and Integrated Extraction System (ARIES), a low waste, modular pyroprocessing system to convert pits to plutonium oxide. The PDCF project consists of engineering and design, and construction of the buildings and structures, and engineering and design, procurement, installation, testing and start-up of equipment to disassemble pits and convert plutonium in pits to oxide form. The facility is planned to operate for 10 years, averaging 3.5 metric tons (3.86 tons) of plutonium metal per year. On conclusion of operations, the PDCF will be decontaminated and decommissioned

  20. Design-only conceptual design report for pit disassembly and conversion facility. Rev 0

    Energy Technology Data Exchange (ETDEWEB)

    Zygmunt, S.; Christensen, L.; Richardson, C.

    1997-12-12

    This design-only conceptual design report (DOCDR) was prepared to support a funding request by the Department of Energy (DOE)-Office of Fissile Material Disposition (OFMD) for engineering design of the Pit Disassembly and Conversion Facility (PDCF) Project No. 99-D-141. The PDCF will be used to disassemble the nation`s inventory of surplus nuclear weapons pits and convert the plutonium recovered from those pits into a form suitable for storage, international inspection, and final disposition. The PDCF is a complex consisting of a hardened building that will contain the plutonium processes in a safe and secure manner, and conventional buildings and structures that will house support personnel, systems, and equipment. The PDCF uses the Advanced Recovery and Integrated Extraction System (ARIES), a low waste, modular pyroprocessing system to convert pits to plutonium oxide. The PDCF project consists of engineering and design, and construction of the buildings and structures, and engineering and design, procurement, installation, testing and start-up of equipment to disassemble pits and convert plutonium in pits to oxide form. The facility is planned to operate for 10 years, averaging 3.5 metric tons (3.86 tons) of plutonium metal per year. On conclusion of operations, the PDCF will be decontaminated and decommissioned.

  1. 7 CFR 58.127 - Facilities.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Facilities. 58.127 Section 58.127 Agriculture..., Facilities, Equipment and Utensils § 58.127 Facilities. (a) Water supply. There shall be an ample supply of both hot and cold water of safe and sanitary quality, with adequate facilities for its proper...

  2. Physics Simulation Software for Autonomous Propellant Loading and Gas House Autonomous System Monitoring

    Science.gov (United States)

    Regalado Reyes, Bjorn Constant

    2015-01-01

    1. Kennedy Space Center (KSC) is developing a mobile launching system with autonomous propellant loading capabilities for liquid-fueled rockets. An autonomous system will be responsible for monitoring and controlling the storage, loading and transferring of cryogenic propellants. The Physics Simulation Software will reproduce the sensor data seen during the delivery of cryogenic fluids including valve positions, pressures, temperatures and flow rates. The simulator will provide insight into the functionality of the propellant systems and demonstrate the effects of potential faults. This will provide verification of the communications protocols and the autonomous system control. 2. The High Pressure Gas Facility (HPGF) stores and distributes hydrogen, nitrogen, helium and high pressure air. The hydrogen and nitrogen are stored in cryogenic liquid state. The cryogenic fluids pose several hazards to operators and the storage and transfer equipment. Constant monitoring of pressures, temperatures and flow rates are required in order to maintain the safety of personnel and equipment during the handling and storage of these commodities. The Gas House Autonomous System Monitoring software will be responsible for constantly observing and recording sensor data, identifying and predicting faults and relaying hazard and operational information to the operators.

  3. Line facilities outline

    International Nuclear Information System (INIS)

    1998-08-01

    This book deals with line facilities. The contents of this book are outline line of wire telecommunication ; development of line, classification of section of line and theory of transmission of line, cable line ; structure of line, line of cable in town, line out of town, domestic cable and other lines, Optical communication ; line of optical cable, transmission method, measurement of optical communication and cable of the sea bottom, Equipment of telecommunication line ; telecommunication line facilities and telecommunication of public works, construction of cable line and maintenance and Regulation of line equipment ; regulation on technique, construction and maintenance.

  4. Variations in status of preparation of personal protective equipment for preventing norovirus gastroenteritis in long-term care facilities for the elderly.

    Science.gov (United States)

    Fujiki, Saori; Ishizaki, Tatsuro; Nakayama, Takeo

    2017-12-01

    Residents of long-term care facilities are highly susceptible to norovirus gastroenteritis, and each facility is concerned about the need to implement norovirus infection control. Among control measures, personal protective equipment (PPE), such as disposable gloves and masks, plays a major role in reducing infectious spread. However, the preparation status of PPE in facilities before infection outbreaks has not been reported. The aim was to clarify the implementation status of preventive measures for norovirus gastroenteritis and the cost of preparing the necessary PPE in long-term care facilities. A questionnaire survey of facilities affiliated with the Kyoto Prefecture and Osaka Prefecture branches of the Japan Association of Geriatric Health Services Facilities was conducted. The survey items were the characteristics of the facility, whether preventive measures had been implemented for norovirus gastroenteritis from October through the following March in both 2009 and 2010, and the quantities and unit prices of PPE prepared for preventive measures. Twenty-six (11.2%) of 232 surveyed facilities (as of August 2011) answered the survey. Among them, 24 (92.3%) in 2009 and 25 (96.2%) in 2010 reported having implemented preventive measures for norovirus gastroenteritis, while 21 facilities (80.8%) in 2009 and 22 facilities (84.6%) in 2010 had prepared PPE. The median total cost for preparing the PPE needed for the preventive measures was US $2601 (range US $221-9192) in 2009 and US $3904 (range US $305-6427) in 2010. Although the results need careful interpretation because of the low response rate, most of the surveyed long-term care facilities had implemented preventive measures for norovirus gastroenteritis. However, the cost of preparing the PPE needed for the preventive measures varied among the facilities. © 2017 John Wiley & Sons, Ltd.

  5. The At-Wavelength Metrology Facility at BESSY-II

    Directory of Open Access Journals (Sweden)

    Franz Schäfers

    2016-02-01

    Full Text Available The At-Wavelength Metrology Facility at BESSY-II is dedicated to short-term characterization of novel UV, EUV and XUV optical elements, such as diffraction gratings, mirrors, multilayers and nano-optical devices like reflection zone plates. It consists of an Optics Beamline PM-1 and a Reflectometer in a clean-room hutch as a fixed end station. The bending magnet Beamline is a Plane Grating Monochromator beamline (c-PGM equipped with an SX700 monochromator. The beamline is specially tailored for efficient high-order suppression and stray light reduction. The versatile 11-axes UHV-Reflectometer can house life-sized optical elements, which are fully adjustable and of which the reflection properties can be measured in the full incidence angular range as well as in the full azimuthal angular range to determine polarization properties.

  6. 20 CFR 416.1023 - Facilities.

    Science.gov (United States)

    2010-04-01

    ... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Facilities. 416.1023 Section 416.1023... Facilities. (a) Space, equipment, supplies, and other services. Subject to appropriate Federal funding, the... and prompt disability determinations. (b) Location of facilities. Subject to appropriate Federal...

  7. 45 CFR 1304.53 - Facilities, materials, and equipment.

    Science.gov (United States)

    2010-10-01

    ... DEVELOPMENT SERVICES, DEPARTMENT OF HEALTH AND HUMAN SERVICES THE ADMINISTRATION FOR CHILDREN, YOUTH AND... development of each child. (2) Grantee and delegate agencies must provide appropriate space for the conduct of... meet the needs and facilitate the participation of children and adults. Equipment, toys, materials, and...

  8. Effects of bedding material on ammonia volatilization in a broiler house

    Science.gov (United States)

    Ammonia volatilization from poultry house bedding material is a major production issues because the buildup of ammonia within the facilities is a human health issue and can negatively impact the performance of the birds. Major operational cost is associated with the ventilation of poultry houses to ...

  9. Sea water take-up facility for cooling reactor auxiliary

    International Nuclear Information System (INIS)

    Numata, Noriko; Mizutani, Akira; Hirako, Shizuka; Uchiyama, Yuichi; Oda, Atsushi.

    1997-01-01

    The present invention provides an improvement of a cooling sea water take-up facility for cooling auxiliary equipments of nuclear power plant. Namely, an existent sea water take-up facility for cooling reactor auxiliary equipments has at least two circulation water systems and three independent sea water systems for cooling reactor auxiliary equipments. In this case, a communication water channel is disposed, which connects the three independent sea water systems for cooling reactor auxiliary equipments mutually by an opening/closing operation of a flow channel partitioning device. With such a constitution, even when any combination of two systems among the three circulation water systems is in inspection at the same time, one system for cooling the reactor auxiliary equipments can be kept operated, and one system is kept in a stand-by state by the communication water channel upon periodical inspection of water take-up facility for cooling the auxiliary equipments. As a result, the sea water take-up facility for cooling auxiliary equipments of the present invention have operation efficiency higher than that of a conventional case while keeping the function and safety at the same level as in the conventional case. (I.S.)

  10. 40 CFR 160.43 - Test system care facilities.

    Science.gov (United States)

    2010-07-01

    ... testing facility shall have a number of animal rooms or other test system areas separate from those... housed, facilities shall exist for the collection and disposal of all animal waste and refuse or for safe sanitary storage of waste before removal from the testing facility. Disposal facilities shall be so...

  11. Web-Based Requesting and Scheduling Use of Facilities

    Science.gov (United States)

    Yeager, Carolyn M.

    2010-01-01

    Automated User's Training Operations Facility Utilization Request (AutoFUR) is prototype software that administers a Web-based system for requesting and allocating facilities and equipment for astronaut-training classes in conjunction with scheduling the classes. AutoFUR also has potential for similar use in such applications as scheduling flight-simulation equipment and instructors in commercial airplane-pilot training, managing preventive- maintenance facilities, and scheduling operating rooms, doctors, nurses, and medical equipment for surgery. Whereas requesting and allocation of facilities was previously a manual process that entailed examination of documents (including paper drawings) from different sources, AutoFUR partly automates the process and makes all of the relevant information available via the requester s computer. By use of AutoFUR, an instructor can fill out a facility-utilization request (FUR) form on line, consult the applicable flight manifest(s) to determine what equipment is needed and where it should be placed in the training facility, reserve the corresponding hardware listed in a training-hardware inventory database, search for alternative hardware if necessary, submit the FUR for processing, and cause paper forms to be printed. Auto-FUR also maintains a searchable archive of prior FURs.

  12. Space Power Facility (SPF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Space Power Facility (SPF) houses the world's largest space environment simulation chamber, measuring 100 ft. in diameter by 122 ft. high. In this chamber, large...

  13. 49 CFR 1242.42 - Administration, repair and maintenance, machinery repair, equipment damaged, dismantling retired...

    Science.gov (United States)

    2010-10-01

    ... repair, equipment damaged, dismantling retired property, fringe benefits, other casualties and insurance, lease rentals, joint facility rents, other rents, depreciation, joint facility, repairs billed to others... maintenance, machinery repair, equipment damaged, dismantling retired property, fringe benefits, other...

  14. IFR fuel cycle process equipment design environment and objectives

    International Nuclear Information System (INIS)

    Rigg, R.H.

    1993-01-01

    Argonne National laboratory (ANL) is refurbishing the hot cell facility originally constructed with the EBR-II reactor. When refurbishment is complete, the facility win demonstrate the complete fuel cycle for current generation high burnup metallic fuel elements. These are sodium bonded, stainless steel clad fuel pins of U-Zr or U-Pu-Zr composition typical of the fuel type proposed for a future Integral Fast Reactor (IFR) design. To the extent possible, the process equipment is being built at full commercial scale, and the facility is being modified to incorporate current DOE facility design requirements and modem remote maintenance principles. The current regulatory and safety environment has affected the design of the fuel fabrication equipment, most of which will be described in greater detail in subsequent papers in this session

  15. Selection for Resistance to Imidacloprid in the House Fly (Diptera: Muscidae)

    Science.gov (United States)

    House flies, Musca domestica L., continue to be a primary pest of livestock facilities worldwide. This pest also has shown a propensity for pesticide resistance development when under high selection pressures. In this study a house fly strain, FDm was created by a 20% contribution from each of fiv...

  16. Horizontal temperature distribution in a plus-energy house: cooling season measurements

    DEFF Research Database (Denmark)

    Kazanci, Ongun Berk; Olesen, Bjarne W.

    2015-01-01

    The present study is concerned with the air and operative temperatures at different locations in a detached, one-story, single family, plus-energy house. The house was located in Denmark and it has been used as a full-scale experimental facility with heated dummies to simulate occupants living...

  17. Energy Systems Test Area (ESTA). Power Systems Test Facilities

    Science.gov (United States)

    Situ, Cindy H.

    2010-01-01

    This viewgraph presentation provides a detailed description of the Johnson Space Center's Power Systems Facility located in the Energy Systems Test Area (ESTA). Facilities and the resources used to support power and battery systems testing are also shown. The contents include: 1) Power Testing; 2) Power Test Equipment Capabilities Summary; 3) Source/Load; 4) Battery Facilities; 5) Battery Test Equipment Capabilities Summary; 6) Battery Testing; 7) Performance Test Equipment; 8) Battery Test Environments; 9) Battery Abuse Chambers; 10) Battery Abuse Capabilities; and 11) Battery Test Area Resources.

  18. 40 CFR 82.158 - Standards for recycling and recovery equipment.

    Science.gov (United States)

    2010-07-01

    ... importers of recycling and recovery equipment intended for use during the maintenance, service, or repair of... recycling or recovery equipment at manufacturing facilities to ensure that each equipment model line that... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Standards for recycling and recovery...

  19. 7 CFR 51.57 - Facilities.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Facilities. 51.57 Section 51.57 Agriculture... Requirements for Plants Operating Under Continuous Inspection on A Contract Basis § 51.57 Facilities. Each packing plant shall be equipped with adequate sanitary facilities and accommodations, including but not...

  20. 50 CFR 260.100 - Facilities.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false Facilities. 260.100 Section 260.100... Basis 1 § 260.100 Facilities. Each official establishment shall be equipped with adequate sanitary facilities and accommodations, including, but not being limited to, the following: (a) Containers approved...

  1. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  2. On-orbit technology experiment facility definition

    Science.gov (United States)

    Russell, Richard A.; Buchan, Robert W.; Gates, Richard M.

    1988-01-01

    A study was conducted to identify on-orbit integrated facility needs to support in-space technology experiments on the Space Station and associated free flyers. In particular, the first task was to examine the proposed technology development missions (TDMX's) from the model mission set and other proposed experimental facilities, both individually and by theme, to determine how and if the experiments might be combined, what equipment might be shared, what equipment might be used as generic equipment for continued experimentation, and what experiments will conflict with the conduct of other experiments or Space Station operations. Then using these results, to determine on-orbit facility needs to optimize the implementation of technology payloads. Finally, to develop one or more scenarios, design concepts, and outfitting requirements for implementation of onboard technology experiments.

  3. 33 CFR 149.655 - What are the requirements for helicopter fueling facilities?

    Science.gov (United States)

    2010-07-01

    ... helicopter fueling facilities? 149.655 Section 149.655 Navigation and Navigable Waters COAST GUARD... EQUIPMENT Design and Equipment Helicopter Fueling Facilities § 149.655 What are the requirements for helicopter fueling facilities? Helicopter fueling facilities must comply with 46 CFR 108.489 or an equivalent...

  4. Thermal design of a modern, air-conditioned, single-floor, solar-powered desert house

    KAUST Repository

    Serag-Eldin, M. A.

    2011-01-01

    The paper presents a thermal analysis of a single-floor, solar-powered desert house. The house is air-conditioned and provides all modern comforts and facilities. Electrical power, which drives the entire energy system, is generated by roof

  5. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  6. Energy conservation progress in building equipment. Energy conservation on the sports facilities; Kenchiku setsubi ni okeru sho energy no shiten. Supotsu reja shisetsu no sho energy

    Energy Technology Data Exchange (ETDEWEB)

    Sakura, I.; Kayo, M. [Kajima Corp., Tokyo (Japan)

    1996-06-05

    There are various kinds of sports and leisure facilities. Due to their classes, aims, operation styles and so forth, the grades of aimed environments and facilities change. For example, like a baseball, swimming and skating, quantity of motion and grade of sportswear are different due to their classes and a target environment is also differs. On the other hand, public facility for citizen use is required its cheaper fee, but private facility on commercial base is required its user-collecting capability with added-value. In order to content individual needs of each facility, it is important to combine properly its target environment and its equipment system. The sports and leisure facilities have often large space on their characteristics, and are necessary to maintain their target environments as well as to treat their thermal emission in closed space and to supply their required air. Therefore, it is an extremely meaningful to conduct the energy saving in the facility apt to consume a lot of energy, which is described in this paper mainly on in-door large space facilities. 17 refs., 1 tab.

  7. Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Kirk, P.G.; Stephens, Jr.J.M.

    2009-01-01

    The Integrated Facility Disposition Project (IFDP) is a multi-billion-dollar remediation effort being conducted by the U.S. Department of Energy (DOE) Office of Environmental Management in Oak Ridge, Tennessee. The scope of the IFDP encompasses remedial actions related to activities conducted over the past 65 years at the Oak Ridge National Laboratory (ORNL) and the Y-12 National Security Complex (Y-12). Environmental media and facilities became contaminated as a result of operations, leaks, spills, and past waste disposal practices. ORNL's mission includes energy, environmental, nuclear security, computational, and materials research and development. Remediation activities will be implemented at ORNL as part of IFDP scope to meet remedial action objectives established in existing and future decision documents. Remedial actions are necessary (1) to comply with environmental regulations to reduce human health and environmental risk and (2) to release strategic real estate needed for modernization initiatives at ORNL. The scope of remedial actions includes characterization, waste management, transportation and disposal, stream restoration, and final remediation of contaminated soils, sediments, and groundwater. Activities include removal of at or below-grade substructures such as slabs, underground utilities, underground piping, tanks, basins, pits, ducts, equipment housings, manholes, and concrete-poured structures associated with equipment housings and basement walls/floors/columns. Many interim remedial actions involving groundwater and surface water that have not been completed are included in the IFDP remedial action scope. The challenges presented by the remediation of Bethel Valley at ORNL are formidable. The proposed approach to remediation endeavors to use the best available technologies and technical approaches from EPA and other federal agencies and lessons learned from previous cleanup efforts. The objective is to minimize cost, maximize remedial

  8. Resistance welding equipment manufacturing capability for exports

    Energy Technology Data Exchange (ETDEWEB)

    Sastry, V.S.; Raju, Y.S.; Somani, A.K.; Setty, D.S.; Rameswara Raw, A.; Hermantha Rao, G.V.S.; Jayaraj, R.N. [Nuclear Fuel Complex, Dept. of Atomic Energy, Hyderbad (India)

    2010-07-01

    Indian Pressurised Heavy Water Reactor (PHWR) fuel bundle is fully welded and is unique in its design. Appendage welding, end closure welding, and end plate welding is carried out using resistance welding technique. Out of many joining processes available, resistance-welding process is reliable, environment friendly and best suitable for mass production applications. Nuclear Fuel Complex (NFC), an industrial unit is established in Hyderabad, under the aegis of the Dept of Atomic Energy to manufacture fuel for Pressurised Heavy Water Reactors. From inception, NFC has given importance for self-reliance and indigenization with respect to manufacturing process and equipment. Sintering furnaces, centreless grinders, appendage-welding machines, end-closure welding equipment and end-plate welding equipments, which were initially imported, are either indigenized or designed and manufactured in house. NFC has designed, manufactured a new appendage-welding machine for manufacturing 37 element fuel bundles. Recently NFC has bagged an order from IAEA through international bidding for design, manufacture, supply, erection and commissioning of end-closure welding equipment. The paper gives in detail the salient features of these welding equipment. (author)

  9. 30 CFR 57.6161 - Auxiliary facilities.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Auxiliary facilities. 57.6161 Section 57.6161...-Underground Only § 57.6161 Auxiliary facilities. (a) Auxiliary facilities used to store explosive material near work places shall be wooden, box-type containers equipped with covers or doors, or facilities...

  10. New instrument calibration facility for the DOE Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wilkie, W.H.; Polz, E.J. [Westinghouse Savannah River Company, Aiken, SC (United States)

    1993-12-31

    A new laboratory facility is being designed, constructed, and equipped at the Savannah River Site (SRS) as a fiscal year 1992 line item project. This facility will provide space and equipment for test, evaluation, repair, maintenance, and calibration of radiation monitoring instrumentation. The project will replace an obsolete facility and will allow implementation of program upgrades necessary to meet ANSI N323 requirements and National Voluntary Laboratory Accreditation Program (NVLAP) criteria for accreditation of federally owned secondary calibration laboratories. An outline of the project is presented including description, scope, cost, management organization, chronology, and current status. Selected design criteria and their impacts on the project are discussed. The upgraded SRS calibration program is described, and important features of the new facility and equipment that will accommodate this program are listed. The floor plan for the facility is shown, and equipment summaries and functional descriptions for each area are provided.

  11. New instrument calibration facility for the DOE Savannah River Site

    International Nuclear Information System (INIS)

    Wilkie, W.H.; Polz, E.J.

    1993-01-01

    A new laboratory facility is being designed, constructed, and equipped at the Savannah River Site (SRS) as a fiscal year 1992 line item project. This facility will provide space and equipment for test, evaluation, repair, maintenance, and calibration of radiation monitoring instrumentation. The project will replace an obsolete facility and will allow implementation of program upgrades necessary to meet ANSI N323 requirements and National Voluntary Laboratory Accreditation Program (NVLAP) criteria for accreditation of federally owned secondary calibration laboratories. An outline of the project is presented including description, scope, cost, management organization, chronology, and current status. Selected design criteria and their impacts on the project are discussed. The upgraded SRS calibration program is described, and important features of the new facility and equipment that will accommodate this program are listed. The floor plan for the facility is shown, and equipment summaries and functional descriptions for each area are provided

  12. Stability of Household and Housing Characteristics among Farmworker Families in North Carolina: Implications for Health

    Science.gov (United States)

    Arcury, Thomas A.; Trejo, Grisel; Suerken, Cynthia K.; Ip, Edward H.; Quandt, Sara A.

    2016-01-01

    Household and housing stability are important for health and well-being of individuals, particularly children. This analysis examines stability in household and housing over 2 years for North Carolina farmworker families with children. Mothers with a child aged 2–4 years in farmworker families (n=248) completed interviews over two years. Household measures included number of adults and children, moves, and spouse absence. Housing measures included tenure, persons per bedroom, and kitchen facilities. Household and housing characteristics for participants retained in the study over two years (n=221) were stable in number of persons, tenure, persons per bedroom, and kitchen facilities. Households were large with one-third having 3 or more adults, and one-quarter having 4 or more children. Most families rented houses (over 15% owned), which were crowded. Participants lost to follow-up were similar to retained participants in household characteristics, but had worse housing characteristics. Comparative research on farmworker family household composition is needed. PMID:26856879

  13. The influence of housing characteristics on rural migrants’ living condition in Beijing Fengtai District

    Directory of Open Access Journals (Sweden)

    Liu Wen Tao

    2015-08-01

    Full Text Available The study analyzes the influence of housing characteristics on rural migrants’ living condition in Beijing Fengtai District, China. The researcher will identify rural migrants in Beijing, examine their housing characteristics (housing crowding, housing privacy and housing facility and the influence on their living condition. Also, some suggestions are given to improve their housing characteristics and living condition. The government should revise the migrant housing policy and hukou management. Also, the rural migrants should try to increase their education level and social skills. For the occupation, the local government should give the rural migrants more job opportunity. These issues are analyzed in relation to local government attitudes toward the rural migrants. The analysis is based on data collected from two types of interviews: rural migrants and management interviews which examine the rural migrants’ housing and managerial aspects of this research, respectively. It is also supported by the utilization of secondary data. The findings of the study indicate that the rural migrants’ housing characteristics (housing crowding, housing privacy and housing facility highly influence their living condition in Beijing Fengtai District. Therefore, the local government should give some assistance to this group people in the big cities. This paper reports on the findings of a study to seek acknowledged definitions of the terms Project and Project Management. The study was based on a conventional review and analysis of the definitions from a series of texts.

  14. Reconstruction of Co-60 Irradiation Facility No.1

    International Nuclear Information System (INIS)

    Nakamura, Yoshiteru; Takada, Isao; Kaneko, Hirohisa; Hirao, Toshio; Haneda, Noriyuki; Mitomo, Shouichi; Tachibana, Hiroyuki; Yoshida, Kenzou

    1989-01-01

    Cobalt Irradiation Facility No.1 was constructed in 1964 as the first large scale Co-60 irradiation facility equipped a deep water pool for source storage of Co-60 sources. Recently, the reconstruction of the facility was decided because the aging of various parts of the facility became remarkable and new research programs required upgradings of the facility. Important points of upgradings are as follows: A shielding capacity of the source storage and pool is increased to 55.5 PBq from 18.5 PBq. The opening in a floor of the irradiation room which is used for the source lifting in the room, is enlarged in order to utilize a large and high intensity source. Radiation resistance of the irradiation apparatus and installed equipments in the radiation room is increased for a high dose rate irradiation. Basic structure and shape of the facility building such as shielding, pool and building roof is not changed but electrical, mechanical equipments and systems are completely renewed. To increase a reliability, the irradiation apparatus and systems are also replaced with an improved and up-to-date one designed based on operation experiences of Co-60 facilities at TRCRE through many years. In addition, auxiliary equipments such as radiation monitors, manipulators, water treatment system and so on are replaced. This report presents the reconstruction of Co-60 Irradiation Facility No.1 stressing on the replacement and modification of the irradiation apparatus. (author)

  15. The Toulouse pulsed magnet facility

    International Nuclear Information System (INIS)

    2006-01-01

    The 'Laboratoire National des Champs Magnetiques Pulses' (LNCMP) is an international user facility providing access to pulsed magnetic fields up to and beyond 60 T. The laboratory disposes of 10 magnet stations equipped with long-pulse magnets operating in the 35-60 T range and a short-pulse system reaching magnetic fields in excess of 70 T. The experimental infrastructure includes various high and low-temperature systems ranging from ordinary flow-type cryostats to dilution refrigerators reaching 50 mK, as well as different types of high-pressure cells. Experimental techniques include magnetization, transport, luminescence, IR-spectroscopy and polarimetry. The LNCMP pursues an extensive in-house research program focussing on all technological and scientific aspects of pulsed magnetic fields. Recent technical developments include the implementation of 60 T rapid-cooling coils, an 80 T prototype, a pulsed dipole magnet for optical investigations of dilute matter and a transportable horizontal access magnet for small angle x-ray scattering experiments. Scientific activities cover a variety of domains, including correlated electron systems, magnetism, semiconductors and nanoscience

  16. Shaking table testing of electrical equipment in Argentina

    International Nuclear Information System (INIS)

    Carmona, J.S.; Zabala, F.; Santalucia, J.; Sisterna, C.; Magrini, M.; Oldecop, L.

    1995-01-01

    This paper describes the testing facility, the methodology applied and the results obtained in the seismic qualification tests of different types of electric equipment. These tests were carried out on a shaking table that was developed and built at the Earthquake Research Institute of the National University of San Juan, Argentine. The equipment tested consist of 500 KV and 132 KV current transformers, a 500 KV voltage transformer, a 145 KV disconnecter and a relay cabinet. The acceleration response of the tested equipment was measured at several locations distributed along its height, and strains were measured at critical points by strain gauges cemented on the base of the porcelain insulator. All the information was recorded with a data acquisition system at a sampling rate of 200 times per second in each channel. The facility developed at this Institute is the largest one in operation in Argentina at present and the equipment tested is the highest, heaviest and more slender one which has been seismically qualified on a shaking table in this country. These tests have been a valuable experience in the field of structural dynamic testing applied to equipment of hydroelectric and nuclear power plants. (author)

  17. Kozloduy Nuclear Power Plant (Unit 1 and 2). Proposed modifications to increase the seismic capability of equipment and main structures

    International Nuclear Information System (INIS)

    Ordonez Villalobos, A.; Monette, P.R.

    1993-01-01

    Within the framework of the European Community's PHARE Programme of improvement to facilities, their operating systems, equipment and buildings of the Kozloduy NPP in Bulgaria, plant safety during seismic events is considered to be an issue of overriding importance, especially in view of the earthquakes the region suffered during the last decade. Westinghouse Energy Systems International (WESI) and Empresarios Agrupados (EA) have initiated an intensive programme for physical upgrading of equipment with a view to augmenting its seismic capability and, at the same time, to studying design modifications in the diesel-generator buildings, pump house and main building structures (turbines, electrical building). The implementation of these modifications requires an in situ inspection of the real conditions of the various elements, analyses, conceptual design and detail engineering, all of which has to be done in short periods of time using resources available at the plant. This activity is performed by the companies mentioned above, with the collaboration of two engineering companies, Energoproekt of Bulgaria and INITEC of Spain. This paper describes the activities developed and the treatment given to the various aspects of improvement of the seismic capability of equipment and structures. (author)

  18. Planning the School Food Service Facilities. Revised 1967.

    Science.gov (United States)

    Utah State Board of Education, Salt Lake City.

    Evaluations of food service equipment, kitchen design and food service facilities are comprehensively reviewed for those concerned with the planning and equipping of new school lunchrooms or the remodeling of existing facilities. Information is presented in the form of general guides adaptable to specific local situations and needs, and is…

  19. Annual experimental results on heat and cool storage modes for natural energy autonomous house, HARBEMAN house; Shizen energy jiritsu house (HARBEMAN house) no chikunetsu chikurei mode no jissoku kekka

    Energy Technology Data Exchange (ETDEWEB)

    Saito, T; Fujino, T; Suzuki, M [Tohoku University, Sendai (Japan)

    1997-11-25

    Outlined herein is performance of the solar system, followed for a year, installed in a solar house (HARBEMAN HOUSE) built in 1996 in City of Sendai. The house is equipped, on the roof, with a 30.42m{sup 2} wide solar collector on the south and sky radiator on the north. They are connected to a heat-insulated tank (31m{sup 3}) installed underground, storing hot or cool water which carries energy for heating/air-conditioning and hot water. The solar system operates in a long-term hot or cool water storage mode. In the hot water storage mode, the solar collector is connected to the underground main tank, where pumped-up water heated by solar heat is stored to be supplied as hot water. Heat collected is low during the December-February period, and recovered in March. In the cool water storage mode, the radiator is connected to the underground main tank, where pumped-up water is cooled by radiation and stored to be supplied to a fan coil unit in each room for air-conditioning. The recorded lowest temperature of water in the tank is 5.1degC. No air-conditioning load is observed, on account of the unseasonal weather. 3 refs., 10 figs., 2 tabs.

  20. Evolution of metering and control equipment in district heating house substations. Smaller, smarter and unchangingly robust; Mess- und Regelungstechnik fuer Fernwaermehausstationen im Wandel der Zeit. Kleiner, intelligenter, unveraendert robust

    Energy Technology Data Exchange (ETDEWEB)

    Hesse, Wolfgang; Hilbig, Thomas [Samson AG, Frankfurt am Main (Germany)

    2011-07-15

    The technical evolution of house substations in hot water networks reflects the trend towards greater efficiency. Changes are to be seen above all in the requirements placed on the measurement and control technology used in the energy management functions of the electronic district heating controller as well as on safety equipment. Here DDC (Direct Digital Control) technology has created possibilities for optimising energy consumption. The authors relate the evolution of drinking water heating, self-operated regulators, electrical actuators and of electronic district heating controllers.

  1. Coal-fired boiler houses in Cracow present state and possibilities to improve their efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Cyklis, P. [Institute of Industrial Equipment and Power Engineering, Cracow (Poland); Butcher, T.A. [Brookhaven National Lab., Upton, NY (United States)

    1995-12-31

    A significant amount of heat energy both for heating and process purposes is generated in Cracow, Poland in small-and medium size local boiler houses. The operating procedure of these boiler houses is most often economically and ecologically ineffective because of the bad condition of boilers and lack of funds to install automation, control and measurement equipment. Within the Polish-American Program of Elimination of Low Emission Sources financed by the US Department of Energy, the ENERGOEKSPERT Co., Ltd. investigated chosen boiler houses in Cracow, commissioned by the Cracow Development Office. The results of these investigations were subject of engineering analysis carried out at the Institute of Industrial Equipment and Power Engineering, Technical University, Cracow. The analysis proved that the low-cost improvement of economic efficiency and reduction of air pollutant emission is feasible for combustion of coal fuels.

  2. Equipment for liquid metal pressure measurement

    International Nuclear Information System (INIS)

    Jung, J.

    1977-01-01

    Equipment is proposed for measuring liquid metal pressure in piping or a tank. An auxiliary piping is connected to the piping or tank at the measuring point. The auxiliary piping transports liquid metal to a container by means of an electromagnetic pump. The piping also houses an electromagnetic flow ratemeter connected to an electric comparator. The comparator and the electromagnetic pump are connected to the pump output generator. (Z.M.)

  3. FY 1999 report on the results of the joint study - project on the public facility use photovoltaic power generation field test; 1999 nendo kokyo shisetsunadoyo taiyoko hatsuden field test jigyo kyodo kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-07-01

    In the field test, solar cell panels were installed on rooftop, and inverters were installed indoors. The electric power generated was connected at high pressure with electric installation of facilities and was also supplied to power equipment, lighting, air conditioning, etc. in facilities. The FY 1999 results were summarized. The installation of photovoltaic power generation facilities at 137 places and the results of the study were summarized in this report including a new university co-op building, Tokyo Metropolitan Advanced Technology Education Center, Suwano Center House of Fukushima prefecture, Environment Center of Saga prefecture, Educational Foundation Utsukushino Kindergarten, Hikarigaoka Park of Yamagata prefecture, Koiwai factory of Koiwai Dairy Products Co., Social Welfare Corporation Kameyama Ayumi Nursery School, etc. (NEDO)

  4. Development of holdup monitor system (HMOS) during facility maintenance

    International Nuclear Information System (INIS)

    Nakamura, Hironobu; Hosoma, Takashi; Tanaka, Izumi

    1999-01-01

    Holdup MOnitor System (HMOS) was developed for the purpose of verifying the constant holdup during facility maintenance in Plutonium Conversion Development Facility (PCDF). The glove box assay system (GBAS; big slab) has been used by inspectors, measures the holdup periodically (i.e. IIV) using coincidence counting. The GBAS couldn't be used for inspection during maintenance period. Because many glove boxes (GB) set in process area had been occupied by large vinyl green-houses due to maintenance. We aimed that the holdup except for the maintenance GB should be constant during maintenance period, the HMOSs were set to 3 GBs. The system had been used from June '98 to July '99 for verification. The HMOS detector is located top/bottom of the GB, counts total neutron variation in the GB continuously. Detector efficiencies are 1.2%(top) and 0.12%(bottom), respectively. The measurement variation is observed up to 1.5%(3σ). The HMOS has high sensitivity 8 to 90g Pu (3σ; In case of 1kg Pu holdup, the sensitivity depends on position in the GB). The movement of equipment or nuclear material from/in the GB can be detected effectively. Though the HMOS observes measurement variation related to humidity in the GB, hygroscopic effect of denitration MOX powder, material/equipment movement and mainly 241 Pu nuclear decay, this system can verify that the holdup is constant qualitatively. As a result, in PCDF, safeguard related to the inventory verification during maintenance period (more than 1 year) were successfully performed using holdup monitor system. (author)

  5. Westinghouse integrated cementation facility. Smart process automation minimizing secondary waste

    International Nuclear Information System (INIS)

    Fehrmann, H.; Jacobs, T.; Aign, J.

    2015-01-01

    The Westinghouse Cementation Facility described in this paper is an example for a typical standardized turnkey project in the area of waste management. The facility is able to handle NPP waste such as evaporator concentrates, spent resins and filter cartridges. The facility scope covers all equipment required for a fully integrated system including all required auxiliary equipment for hydraulic, pneumatic and electric control system. The control system is based on actual PLC technology and the process is highly automated. The equipment is designed to be remotely operated, under radiation exposure conditions. 4 cementation facilities have been built for new CPR-1000 nuclear power stations in China

  6. Economic Analysis for Setting Appropriate Repair Cycles on the Fixed Materials and Facilities in the Public Rental Housing

    Directory of Open Access Journals (Sweden)

    Sung-Min Choi

    2016-01-01

    Full Text Available Currently, repair and maintenance cycles that follow the completion of construction facilities lead to the necessitation of subsequent data on the analysis of study and plan for maintenance. As such, an index of evaluation was drafted and a plan of maintenance cycle was computed using the investigation data derived from surveying target housing units in permanent rental environmental conditions, with a minimum age of 20 years, and their maintenance history. Optimal maintenance and replacement methods were proposed based on this data. Economic analysis was conducted through the Risk-Weighted Life Cycle Cost (RWLCC method in order to determine the cost analysis of maintenance life cycle methods used for repair. Current maintenance cycle methods that have been used for 20 years were also compared with alternative maintenance cycles.

  7. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  8. Introduction of a Greenhouse as an Alternative Housing System to a Conventional House and Its Impact on Broiler Performance and Blood and Carcass Variables

    Directory of Open Access Journals (Sweden)

    Khajali F

    2013-01-01

    Full Text Available A study was conducted to compare the growth performance as well as blood and carcass variables of two broiler strains reared in a conventional broiler house and a modified greenhouse equipped with cooling pads and tunnel ventilation system. Eight hundred day-old chickens of two commercial strains (Ross  308 and Lohmann were selected and placed in  8 floor pens (4 pens of  50 broilers for each strain in each housing system. The pens were located randomly throughout the modified greenhouse or the conventional broiler house (two-way ANOVA design. The broilers were provided a standard starter and grower diets  ad libitum. The environmental conditions (i.e.  temperature, relative humidity, lighting program and ventilation rate were kept  similar between the two houses. The results showed that the birds in the greenhouse consumed significantly (P

  9. Analysis on factors affecting consumers decision on purchasing simple-type houses

    Science.gov (United States)

    Rumintang, A.; Sholichin, I.

    2018-01-01

    In line with the increase of the population and the need of comfortable houses, as affected by modernization era, the house demand is getting higher. Hence, conducting a research on consumers need and want in buying a house should be seriously attempted to succeed marketing activity. Using an analysis consumers’ behavior, the researcher will know few affecting factors related to consumers’ satisfaction in buying a house. Among other, the factors in question include: house price, house condition, facilities, location and accessability. The sample of this research was drawn from the residents of Graha Asri Housing, Taman Bulang Permai, and Sukodono Permai. Based on the analysis and discussion, some conclusions are made as follow: the factors and variables affecting the consumers’ decision on each choice of house is different and also the same variables on three sources of data include housing atmosphere, cleaning service, ease of access to shopping center, health clinics or hospitals, tourism spot, schools, and the bus station.

  10. Head-end reprocessing equipment remote maintenance demonstration

    International Nuclear Information System (INIS)

    Evans, J.H.; Metz, C.F. III.

    1989-01-01

    Prototype equipment for reprocessing breeder reactor nuclear fuel was installed in the Remote Operation and Maintenance Demonstration (ROMD) area of the Consolidated Fuel Reprocessing Program (CFRP) facility at the Oak Ridge National Laboratory (ORNL) in order to evaluate the design of this equipment in a cold mock-up of a remotely maintained hot cell. This equipment included the Remote Disassembly System (RDS) and the Remote Shear System (RSS). These systems were disassembled and reassembled remotely by using the extensive remote handling systems that are installed in this simulated hot-cell environment. 5 refs., 5 figs

  11. Development of archetypes of building characteristics libraries for simplified energy use evaluation of houses

    Energy Technology Data Exchange (ETDEWEB)

    Parekh, A. [Natural Resources Canada, Ottawa, ON (Canada). CANMET Energy Technology Centre

    2005-07-01

    Simple energy analysis software is needed for quick and reliable energy evaluations. One of the key requirements for simplified units is the acquisition of default data for house geometry, equipment and thermal characteristics based on type and region in which the house is situated. This paper provided a summary of various house surveys and the document procedures used for developing archetype building characteristics libraries. Specific applications were described to demonstrate the viability of archetype libraries. Representative numerical approaches were applied to develop the archetype house characteristics using data gathered from the surveys of housing stock in Canada. Characteristics included size and type of house; the composition of envelope components; heating and hot water equipment data; airtightness and ventilation parameters; and base loads and operating conditions. The surveys were applied for developing a master spreadsheet. Information was collated and the criteria for correlating geometric and thermal characteristics were established. Various groupings of the data were assembled to arrive at representative thermal and performance values. Key parameters were verified with known reports from Statistics Canada, including foot print area; type of housing; local code requirements for the era of construction; primary fuels; and energy use indices. Parametric energy simulations were then performed to determine the sensitivity of various archetypes based on floor area and location, as well as vintage classification. The representative archetype of housing form included 3 components: (1) geometric configurations, (2) thermal characteristics, and (3) operating parameters. The viability of the archetypical defaults was validated by their application to the Energy Evaluations for the EnerGuide for House Program as well as in Housing Policy Analysis, and Tracking Energy Efficiency of Housing programs. It was concluded that the archetypical information about

  12. The Many Features of Stanford's Housing Maintenance Software.

    Science.gov (United States)

    Milshtein, Amy

    1999-01-01

    Explains how Stanford University custom designed its own building maintenance and administration software package: the Housing Operations Maintenance Enterprise Resource (HOMER). Describes how HOMER relieved facility maintenance staff from some archaic systems, and its development and functionality. (GR)

  13. Simulation Environment Synchronizing Real Equipment for Manufacturing Cell

    Science.gov (United States)

    Inukai, Toshihiro; Hibino, Hironori; Fukuda, Yoshiro

    Recently, manufacturing industries face various problems such as shorter product life cycle, more diversified customer needs. In this situation, it is very important to reduce lead-time of manufacturing system constructions. At the manufacturing system implementation stage, it is important to make and evaluate facility control programs for a manufacturing cell, such as ladder programs for programmable logical controllers (PLCs) rapidly. However, before the manufacturing systems are implemented, methods to evaluate the facility control programs for the equipment while mixing and synchronizing real equipment and virtual factory models on the computers have not been developed. This difficulty is caused by the complexity of the manufacturing system composed of a great variety of equipment, and stopped precise and rapid support of a manufacturing engineering process. In this paper, a manufacturing engineering environment (MEE) to support manufacturing engineering processes using simulation technologies is proposed. MEE consists of a manufacturing cell simulation environment (MCSE) and a distributed simulation environment (DSE). MCSE, which consists of a manufacturing cell simulator and a soft-wiring system, is emphatically proposed in detail. MCSE realizes making and evaluating facility control programs by using virtual factory models on computers before manufacturing systems are implemented.

  14. The presence of biofilm forming microorganisms on hydrotherapy equipment and facilities.

    Science.gov (United States)

    Jarząb, Natalia; Walczak, Maciej

    2017-10-01

    Hydrotherapy equipment provides a perfect environment for the formation and growth of microbial biofilms. Biofilms may reduce the microbiological cleanliness of hydrotherapy equipment and harbour opportunistic pathogens and pathogenic bacteria. The aims of this study were to investigate the ability of microorganisms that colonize hydrotherapy equipment to form biofilms, and to assess the influence of temperature and nutrients on the rate of biofilm formation. Surface swab samples were collected from the whirlpool baths, inhalation equipment and submerged surfaces of a brine pool at the spa center in Ciechocinek, Poland. We isolated and identified microorganisms from the swab samples and measured their ability to form biofilms. Biofilm formation was observed at a range of temperatures, in both nutrient-deficient and nutrient-rich environments. We isolated and identified microorganisms which are known to form biofilms on medical devices (e.g. Stenotrophomonas maltophilia). All isolates were classified as opportunistic pathogens, which can cause infections in humans with weakened immunity systems. All isolates showed the ability to form biofilms in the laboratory conditions. The potential for biofilm formation was higher in the presence of added nutrients. In addition, the hydrolytic activity of the biofilm was connected with the presence of nutrients.

  15. Regulatory process for material handling equipment

    International Nuclear Information System (INIS)

    Rajendran, S.; Agarwal, Kailash

    2017-01-01

    Atomic Energy (Factories) Rules (AEFR) 1996, Rule 35 states, 'Thorough inspection and load testing of a Crane shall be done by a Competent Person at least once every 12 months'. To adhere to this rule, BARC Safety Council constituted 'Material Handling Equipment Committee (MHEC)' under the aegis of Conventional Fire and Safety Review Committee (CFSRC) to carry out periodical inspection and certification of Material Handling Equipment (MHE), tools and tackles used in BARC Facilities at Trombay, Tarapur and Kalpakkam

  16. Radon migration from soil to a house. Computer modelling and its verification on the base of measurements in living houses

    International Nuclear Information System (INIS)

    Janik, M.

    2005-09-01

    In this thesis the Loureiro model of radon migration from soil to a house has been verified. For this purpose the computer code TRIAD has been used. The input data for this code are the ground penetrability and porosity. Methods for determination of these parameters have bee developed and equipment for its measurements has been manufactured and tested

  17. Telemetric assessment of social and single housing: Evaluation of electrocardiographic intervals in jacketed cynomolgus monkeys.

    Science.gov (United States)

    Kaiser, Robert A; Tichenor, Stephen D; Regalia, Douglas E; York, Kristina; Holzgrefe, Henry H

    2015-01-01

    Proactive efforts to socially house laboratory animals are a contemporary, important focus for enhancing animal welfare. Jacketing cynomolgus monkeys has been traditionally considered an exclusionary criterion for social housing based on unsubstantiated concerns that study conduct or telemetry equipment might be compromised. Our objective was to evaluate the effects of jacketing naïve, adolescent cynomolgus monkeys in different single and social housing types based on parallel comparisons of heart rate. Eight naive cynomolgus monkeys were randomized into pairs and ECG data were collected for 24h from each animal in each housing condition using a crossover design. Caging paradigms consisted of standard individual, standard pair, quaternary pair (4 linked cages), and European-style pair housing in non-sequential order varied by pair to control for possible time bias. Dosing and blood collection procedures were performed to characterize any effects of housing on ECG data during study conduct. There was no increase in the incidence of equipment damage in pair vs. individually housed animals. Further, animals in all 4 housing paradigms showed similar acclimation assessed as heart rate (mean 139-154 beats per minute), and maintained similar diurnal rhythms, with an expected slowing of the heart rate at night (aggregate lights out HR 110±4bpm compared to daytime 146±7bpm). This study demonstrates the effects of different social access and housing types on the study-naïve cynomolgus monkeys during jacketed cardiovascular telemetry data collection in a repeat-dose toxicology study design. There were no discernible effects of social housing on baseline ECG parameters collected via jacketed telemetry, and all animals maintained expected diurnal rhythms in all housing settings tested. These data demonstrate that cynomolgus monkeys can be socially housed during data collection as a standard practice, consistent with global efforts to improve study animal welfare. Copyright

  18. Power Electronics and Electric Machines Facilities | Transportation

    Science.gov (United States)

    Research | NREL Facilities Power Electronics and Electric Machines Facilities NREL's power electronics and electric machines thermal management experimentation facilities feature a wide range of four researchers in discussion around a piece of laboratory equipment. Power electronics researchers

  19. 46 CFR 108.489 - Helicopter fueling facilities.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Helicopter fueling facilities. 108.489 Section 108.489... AND EQUIPMENT Fire Extinguishing Systems Fire Protection for Helicopter Facilities § 108.489 Helicopter fueling facilities. (a) Each helicopter fueling facility must have a fire protection system that...

  20. The effect of breeding facility and sexual stimulation on plasma cortisol in boars.

    Science.gov (United States)

    Levis, D G; Barnett, J L; Hemsworth, P H; Jongman, E

    1995-12-01

    Nine boars were used to evaluate effects of breeding facility design and sexual activity on plasma cortisol concentrations . In one breeding facility (conventional), boars were housed individually in small pens, and female pigs were mated in those boar pens. In another breeding facility (Detection-Mating Area [DMA] system), boars were housed individually in stalls, and female pigs were mated in a specific mating pen adjacent to the front of stalls where boars were housed. After 51 d of housing treatment, a catheter was surgically implanted in the cephalic vein for collection of blood samples. Daytime profiles (hourly collections from 0900 to 1700) of cortisol did not differ among boars in the two treatment groups. Cortisol was greater (P cortisol in boars, but breeding facility did not affect the ACTH-induced changes in cortisol concentrations. There was a treatment x time interaction (P cortisol after sexual stimulation, and the magnitude and duration of increase in cortisol were greater (P Cortisol was greater (P cortisol concentration in boars seems to be a normal biological response to sexual activity. However, magnitude and duration of the increase in cortisol may be influenced by breeding facility design and mating procedure. There is no evidence, based on physiological data, that housing boars in stalls in the DMA system has any adverse effects on their welfare.

  1. Animal facilities

    International Nuclear Information System (INIS)

    Fritz, T.E.; Angerman, J.M.; Keenan, W.G.; Linsley, J.G.; Poole, C.M.; Sallese, A.; Simkins, R.C.; Tolle, D.

    1981-01-01

    The animal facilities in the Division are described. They consist of kennels, animal rooms, service areas, and technical areas (examining rooms, operating rooms, pathology labs, x-ray rooms, and 60 Co exposure facilities). The computer support facility is also described. The advent of the Conversational Monitor System at Argonne has launched a new effort to set up conversational computing and graphics software for users. The existing LS-11 data acquisition systems have been further enhanced and expanded. The divisional radiation facilities include a number of gamma, neutron, and x-ray radiation sources with accompanying areas for related equipment. There are five 60 Co irradiation facilities; a research reactor, Janus, is a source for fission-spectrum neutrons; two other neutron sources in the Chicago area are also available to the staff for cell biology studies. The electron microscope facilities are also described

  2. DUPIC facility engineering

    International Nuclear Information System (INIS)

    Park, J. J.; Lee, H. H.; Kim, K. H.

    2002-03-01

    With starting DUPIC fuel fabrication experiment by using spent fuels, 1) operation and refurbishment for DFDF (DUPIC fuel development facility), and 2) operation and improvement of transportation equipment for radioactive materials between facilities became the objectives of this study. This report describes objectives of the project, necessities, state of related technology, R and D scope, R and D results, proposal for application etc

  3. Survey of prevalence of overweight body condition in laboratory-housed cynomolgus macaques (Macaca fascicularis).

    Science.gov (United States)

    Bauer, Sharon A; Leslie, Ken E; Pearl, David L; Fournier, Jocelyn; Turner, Patricia V

    2010-07-01

    Excessive weight gain has been reported to occur in captive cynomolgus macaques with little to no change in diet. Overweight body condition can result in development of hyperglycemia and type 2 diabetes and should be avoided. The purpose of this survey was to assess the prevalence of overweight cynomolgus macaques in North American research facilities, including breeding colonies and short-term and long-term facilities, and to describe current methods used to assess body condition. The survey consisted of 51 questions covering animal population demographics, body weight and body condition scoring, feeding, and behavior. Voluntary participants included veterinarians and animal care managers. Respondents from 13 facilities completed the survey, and information was collected on 17,500 cynomolgus macaques. The majority of surveyed facilities housed juvenile and young adult macaques. The reported prevalence of overweight (greater than 10% of ideal body weight) animals ranged between 0% and 20% and reportedly was more frequent in animals younger than 10 y. Most facilities had weight reduction strategies in place. Despite these programs, a significant proportion of animals were reported as being overweight. The results of this survey demonstrate that most North American facilities housing cynomolgus macaques recognize the importance of tracking body condition regularly. However, implementing effective weight reduction programs may be difficult in captive housing environments. Because of the potential for adverse health effects, facilities should have a means of regularly tracking body weight as well as an action plan for managing overweight animals.

  4. Social housing of non-rodents during cardiovascular recordings in safety pharmacology and toxicology studies.

    Science.gov (United States)

    Prior, Helen; Bottomley, Anna; Champéroux, Pascal; Cordes, Jason; Delpy, Eric; Dybdal, Noel; Edmunds, Nick; Engwall, Mike; Foley, Mike; Hoffmann, Michael; Kaiser, Robert; Meecham, Ken; Milano, Stéphane; Milne, Aileen; Nelson, Rick; Roche, Brian; Valentin, Jean-Pierre; Ward, Gemma; Chapman, Kathryn

    2016-01-01

    The Safety Pharmacology Society (SPS) and National Centre for the Replacement, Refinement & Reduction of Animals in Research (NC3Rs) conducted a survey and workshop in 2015 to define current industry practices relating to housing of non-rodents during telemetry recordings in safety pharmacology and toxicology studies. The aim was to share experiences, canvas opinion on the study procedures/designs that could be used and explore the barriers to social housing. Thirty-nine sites, either running studies (Sponsors or Contract Research Organisations, CROs) and/or outsourcing work responded to the survey (51% from Europe; 41% from USA). During safety pharmacology studies, 84, 67 and 100% of respondents socially house dogs, minipigs and non-human primates (NHPs) respectively on non-recording days. However, on recording days 20, 20 and 33% of respondents socially house the animals, respectively. The main barriers for social housing were limitations in the recording equipment used, study design and animal temperament/activity. During toxicology studies, 94, 100 and 100% of respondents socially house dogs, minipigs and NHPs respectively on non-recording days. However, on recording days 31, 25 and 50% of respondents socially house the animals, respectively. The main barriers for social housing were risk of damage to and limitations in the recording equipment used, food consumption recording and temperament/activity of the animals. Although the majority of the industry does not yet socially house animals during telemetry recordings in safety pharmacology and toxicology studies, there is support to implement this refinement. Continued discussions, sharing of best practice and data from companies already socially housing, combined with technology improvements and investments in infrastructure are required to maintain the forward momentum of this refinement across the industry. Copyright © 2016 The Authors. Published by Elsevier Inc. All rights reserved.

  5. Airborne Evaluation Facility

    Data.gov (United States)

    Federal Laboratory Consortium — AFRL's Airborne Evaluation Facility (AEF) utilizes Air Force Aero Club resources to conduct test and evaluation of a variety of equipment and concepts. Twin engine...

  6. Structural Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — Provides a wide variety of testing equipment, fixtures and facilities to perform both unique aviation component testing as well as common types of materials testing...

  7. Proposed design criteria for a fusion facility electrical ground system

    International Nuclear Information System (INIS)

    Armellino, C.A.

    1983-01-01

    Ground grid design considerations for a nuclear fusion reactor facility are no different than any other facility in that the basis for design must be safety first and foremost. Unlike a conventional industrial facility the available fault energy comes not only from the utility source and in-house rotating machinery, but also from energy storage capacitor banks, collapsing magnetic fields and D.C. transmission lines. It is not inconceivable for a fault condition occurrence where all available energy can be discharged. The ground grid must adequately shunt this sudden energy discharge in a way that personnel will not be exposed by step and/or touch to hazardous energy levels that are in excess of maximum tolerable levels for humans. Fault energy discharge rate is a function of the ground grid surge impedance characteristic. Closed loop paths must be avoided in the ground grid design so that during energy discharge no stray magnetic fields or large voltage potentials between remote points can be created by circulating currents. Single point connection of equipment to the ground grid will afford protection to personnel and sensitive equipment by reducing the probability of circulating currents. The overall ground grid system design is best illustrated as a wagon wheel concept with the fusion machine at the center. Radial branches or spokes reach out to the perimeter limits designated by step-and-touch high risk areas based on soil resistivity criteria considerations. Conventional methods for the design of a ground grid with all of its radial branches are still pertinent. The center of the grid could include a deep well single ground rod element the length of which is at least equivalent to the radius of an imaginary sphere that enshrouds the immediate machine area. Special facilities such as screen rooms or other shielded areas are part of the ground grid system by way of connection to radial branches

  8. Certification of U.S. instrumentation in Russian nuclear processing facilities

    International Nuclear Information System (INIS)

    Powell, D.H.; Sumner, J.N.

    2000-01-01

    Agreements between the United States (U.S.) and the Russian Federation (R.F.) require the down-blending of highly enriched uranium (HEU) from dismantled Russian Federation nuclear weapons. The Blend Down Monitoring System (BDMS) was jointly developed by the Los Alamos National Laboratory (LANL) and the Oak Ridge National Laboratory (ORNL) to continuously monitor the enrichments and flow rates in the HEU blending operations at the R.F. facilities. A significant requirement of the implementation of the BDMS equipment in R.F. facilities concerned the certification of the BDMS equipment for use in a Russian nuclear facility. This paper discusses the certification of the BDMS for installation in R.F. facilities, and summarizes the lessons learned from the process that can be applied to the installation of other U.S. equipment in Russian nuclear facilities

  9. H.R. 2098: This Act may be cited as the Nuclear Facilities Occupational Safety Improvement Act of 1991, introduced in the US House of Representatives, One Hundred Second Congress, First Session, April 25, 1991

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Worker health and safety at Department of Energy nuclear facilities could be made substantially safer by applying standards developed by experts in the field of occupational health and safety. This bill was introduced into the US House of Representatives on April 25, 1991 to amend the Occupational Safety and Health Act of 1970 to improve and enforce standards for employee health and safety at Department of Energy nuclear facilities. Individual sections address the following: application of OSHA to DOE nuclear facilities; cooperation with inspections and investigations; transfer and allocation of appropriations and personnel; worker training requirements; performance of NIOSH functions at DOE nuclear facilities; medical examinations of employees at DOE nuclear facilities; and labor-management health and safety committees at Doe nuclear facilities

  10. Laboratory rhesus macaque social housing and social changes: Implications for research.

    Science.gov (United States)

    Hannibal, Darcy L; Bliss-Moreau, Eliza; Vandeleest, Jessica; McCowan, Brenda; Capitanio, John

    2017-01-01

    Macaque species, specifically rhesus (Macaca mulatta), are the most common nonhuman primates (NHPs) used in biomedical research due to their suitability as a model of high priority diseases (e.g., HIV, obesity, cognitive aging), cost effective breeding and housing compared to most other NHPs, and close evolutionary relationship to humans. With this close evolutionary relationship, however, is a shared adaptation for a socially stimulating environment, without which both their welfare and suitability as a research model are compromised. While outdoor social group housing provides the best approximation of a social environment that matches the macaque behavioral biology in the wild, this is not always possible at all facilities, where animals may be housed indoors in small groups, in pairs, or alone. Further, animals may experience many housing changes in their lifetime depending on project needs, changes in social status, management needs, or health concerns. Here, we review the evidence for the physiological and health effects of social housing changes and the potential impacts on research outcomes for studies using macaques, particularly rhesus. We situate our review in the context of increasing regulatory pressure for research facilities to both house NHPs socially and mitigate trauma from social aggression. To meet these regulatory requirements and further refine the macaque model for research, significant advances must be made in our understanding and management of rhesus macaque social housing, particularly pair-housing since it is the most common social housing configuration for macaques while on research projects. Because most NHPs are adapted for sociality, a social context is likely important for improving repeatability, reproducibility, and external validity of primate biomedical research. Am. J. Primatol. 79:e22528, 2017. © 2016 Wiley Periodicals, Inc. © 2016 Wiley Periodicals, Inc.

  11. The Effects of Housing on Health and Health Risks in an Aging Population: A Qualitative Study in Rural Thailand

    Directory of Open Access Journals (Sweden)

    Ratana Somrongthong

    2014-01-01

    Full Text Available Background. Over the last decade, Thailand has experienced an aging population, especially in rural areas. Research finds a strong, positive relationship between good quality housing and health, and this paper assesses the impact and living experience of housing of older people in rural Thailand. Methods. This was a mixed-method study, using data from observations of the physical adequacy of housing, semistructured interviews with key informants, and archival information from health records for 13 households in rural Thailand. Results. There were four main themes, each of which led to health risks for the older people: “lighting and unsafe wires,” “house design and composition,” “maintenance of the house,” and “health care equipment.” The housing was not appropriately designed to accommodate health care equipment or to fully support individual daily activities of older people. Numerous accidents occurred as a direct result of inadequate housing and the majority of houses had insufficient and unsafe lighting, floor surfaces and furniture that created health risks, and toilets or beds that were at an unsuitable height for older people. Conclusion. This paper provides an improved and an important understanding of the housing situation among older people living in rural areas in Thailand.

  12. (House Municipal School wind energy system: equipment performance). Final technical report

    Energy Technology Data Exchange (ETDEWEB)

    1985-05-14

    The performance of a Skyhawk horizontal axis wind system with a 3-blade, 15-ft upwind rotor is evaluated. The wind system was placed at the House Municipal School. The school is located between Tucumcari and Clovis, New Mexico and has an annual wind regime of 12 mi/h at a height of 33 ft. It was operated for 26 months and during that time has been out of service, due to breakdowns, 13 months. When the Skyhawk was operational, it generated between 100 and 700 kilowatt-hrs per month.

  13. Guide to good practices for equipment and piping labeling

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-12-01

    This Guide to Good Practices is written to enhance understanding of, and provide direction for, Equipment and Piping Labeling, Chapter XVIII of Department of Energy (DOE) Order 5480.19, Conduct of Operations Requirements for DOE Facilities. The practices in this guide should be considered when planning or reviewing labeling programs. Contractors are advised to adopt procedures that meet the intent of DOE Order 5480.19. Equipment and Piping Labeling is an element of an effective Conduct of Operations program. The complexity and array of activities performed in DOE facilities dictate the necessity for a coordinated labeling program to promote safe and efficient operations.

  14. The LNCMP: a pulsed-field user-facility in Toulouse

    International Nuclear Information System (INIS)

    2004-01-01

    Since summer 2002 the 'Laboratoire National des Champs Magnetiques Pulses' is operated as an international user facility providing access to pulsed magnetic fields up to 76 T. The laboratory disposes of 10 magnet stations equipped with long-pulse magnets operating in the 35-60 T range. A short-pulse system reaching 76 T was recently installed in the framework of the European ARMS-project. The experimental infrastructure includes various low-temperature systems ranging from ordinary flow-type cryostats to dilution refrigerators reaching 50 mK. A system permitting transport measurements under hydrostatic pressure and at low temperatures has recently been successfully tested. Experimental techniques include magnetization, transport, luminescence, IR-spectroscopy and the magneto-optical Kerr-effect. The LNCMP pursues an extensive in-house research program focusing on technological (reinforced wire, coil design, coil aging) as well as scientific aspects (magnetism, strongly correlated fermions, disordered systems and others)

  15. Experimental Fuels Facility Re-categorization Based on Facility Segmentation

    Energy Technology Data Exchange (ETDEWEB)

    Reiss, Troy P.; Andrus, Jason

    2016-07-01

    The Experimental Fuels Facility (EFF) (MFC-794) at the Materials and Fuels Complex (MFC) located on the Idaho National Laboratory (INL) Site was originally constructed to provide controlled-access, indoor storage for radiological contaminated equipment. Use of the facility was expanded to provide a controlled environment for repairing contaminated equipment and characterizing, repackaging, and treating waste. The EFF facility is also used for research and development services, including fuel fabrication. EFF was originally categorized as a LTHC-3 radiological facility based on facility operations and facility radiological inventories. Newly planned program activities identified the need to receive quantities of fissionable materials in excess of the single parameter subcritical limit in ANSI/ANS-8.1, “Nuclear Criticality Safety in Operations with Fissionable Materials Outside Reactors” (identified as “criticality list” quantities in DOE-STD-1027-92, “Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports,” Attachment 1, Table A.1). Since the proposed inventory of fissionable materials inside EFF may be greater than the single parameter sub-critical limit of 700 g of U-235 equivalent, the initial re-categorization is Hazard Category (HC) 2 based upon a potential criticality hazard. This paper details the facility hazard categorization performed for the EFF. The categorization was necessary to determine (a) the need for further safety analysis in accordance with LWP-10802, “INL Facility Categorization,” and (b) compliance with 10 Code of Federal Regulations (CFR) 830, Subpart B, “Safety Basis Requirements.” Based on the segmentation argument presented in this paper, the final hazard categorization for the facility is LTHC-3. Department of Energy Idaho (DOE-ID) approval of the final hazard categorization determined by this hazard assessment document (HAD) was required per the

  16. SU-F-T-169: A Periodic Quality Assurance Program for a Spot-Scanning Proton Treatment Facility

    International Nuclear Information System (INIS)

    Mundy, D; Tryggestad, E; Beltran, C; Furutani, K; Gilson, G; Ito, S; Johnson, J; Kruse, J; Remmes, N; Tasson, A; Whitaker, T; Herman, M

    2016-01-01

    Purpose: To develop daily and monthly quality assurance (QA) programs in support of a new spot-scanning proton treatment facility using a combination of commercial and custom equipment and software. Emphasis was placed on efficiency and evaluation of key quality parameters. Methods: The daily QA program was developed to test output, spot size and position, proton beam energy, and image guidance using the Sun Nuclear Corporation rf-DQA™3 device and Atlas QA software. The program utilizes standard Atlas linear accelerator tests repurposed for proton measurements and a custom jig for indexing the device to the treatment couch. The monthly QA program was designed to test mechanical performance, image quality, radiation quality, isocenter coincidence, and safety features. Many of these tests are similar to linear accelerator QA counterparts, but many require customized test design and equipment. Coincidence of imaging, laser marker, mechanical, and radiation isocenters, for instance, is verified using a custom film-based device devised and manufactured at our facility. Proton spot size and position as a function of energy are verified using a custom spot pattern incident on film and analysis software developed in-house. More details concerning the equipment and software developed for monthly QA are included in the supporting document. Thresholds for daily and monthly tests were established via perturbation analysis, early experience, and/or proton system specifications and associated acceptance test results. Results: The periodic QA program described here has been in effect for approximately 9 months and has proven efficient and sensitive to sub-clinical variations in treatment delivery characteristics. Conclusion: Tools and professional guidelines for periodic proton system QA are not as well developed as their photon and electron counterparts. The program described here efficiently evaluates key quality parameters and, while specific to the needs of our facility

  17. SU-F-T-169: A Periodic Quality Assurance Program for a Spot-Scanning Proton Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    Mundy, D; Tryggestad, E; Beltran, C; Furutani, K; Gilson, G; Ito, S; Johnson, J; Kruse, J; Remmes, N; Tasson, A; Whitaker, T; Herman, M [Mayo Clinic, Rochester, MN (United States)

    2016-06-15

    Purpose: To develop daily and monthly quality assurance (QA) programs in support of a new spot-scanning proton treatment facility using a combination of commercial and custom equipment and software. Emphasis was placed on efficiency and evaluation of key quality parameters. Methods: The daily QA program was developed to test output, spot size and position, proton beam energy, and image guidance using the Sun Nuclear Corporation rf-DQA™3 device and Atlas QA software. The program utilizes standard Atlas linear accelerator tests repurposed for proton measurements and a custom jig for indexing the device to the treatment couch. The monthly QA program was designed to test mechanical performance, image quality, radiation quality, isocenter coincidence, and safety features. Many of these tests are similar to linear accelerator QA counterparts, but many require customized test design and equipment. Coincidence of imaging, laser marker, mechanical, and radiation isocenters, for instance, is verified using a custom film-based device devised and manufactured at our facility. Proton spot size and position as a function of energy are verified using a custom spot pattern incident on film and analysis software developed in-house. More details concerning the equipment and software developed for monthly QA are included in the supporting document. Thresholds for daily and monthly tests were established via perturbation analysis, early experience, and/or proton system specifications and associated acceptance test results. Results: The periodic QA program described here has been in effect for approximately 9 months and has proven efficient and sensitive to sub-clinical variations in treatment delivery characteristics. Conclusion: Tools and professional guidelines for periodic proton system QA are not as well developed as their photon and electron counterparts. The program described here efficiently evaluates key quality parameters and, while specific to the needs of our facility

  18. Evaluation formulas of manpower needs for dismantling of equipments in uranium refining and conversion plant

    International Nuclear Information System (INIS)

    Izumo, Sari; Usui, Hideo; Kubota, Shintaro; Tachibana, Mitsuo; Kawagoshi, Hiroshi; Tokuyasu, Takashi; Takahashi, Nobuo; Morimoto, Yasuyuki; Tanaka, Yoshio; Sugitsue, Noritake

    2014-07-01

    Japan Atomic Energy Agency has developed PROject management data evaluation code for DIsmantling Activities (PRODIA) to make an efficient decommissioning for nuclear facilities. PRODIA is a source code which provides estimated value such as manpower needs, costs, etc., for dismantling by evaluation formulas according to the type of nuclear facility. Evaluation formulas of manpower needs for dismantling of equipments about reprocessed uranium conversion in Uranium Refining and Conversion Plant (URCP) have been developed in this report. In the result, evaluation formulas of manpower needs for dismantling of equipment were derived based on the classifications of equipment's functions or work items. These evaluation formulas are widely applicable to the estimation of the manpower needs for dismantling the other nuclear facilities, in particular uranium handling facilities. It was confirmed that some of these evaluation formulas with the same applicable condition could be unified to some inclusive evaluation formulas. It turned out that all steel equipment contaminated by uranium could be evaluated by one evaluation formula. (author)

  19. Mass Properties Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility is used to acquire accurate weight, 3 axis center of gravity and 3 axis moment of inertia measurements for air launched munitions and armament equipment.

  20. Progress at the ESRF multilayer facility

    International Nuclear Information System (INIS)

    Morawe, Ch; Peffen, J Ch; Friedrich, K; Osterhoff, M

    2013-01-01

    The ESRF multilayer (ML) deposition facility is fully operational since 2009. By the end of 2011, almost 50 ML projects were completed using the new machine, bringing the total number to 143 since 1998. Thanks to the new equipment and its improved performance the throughput could be significantly increased. The ESRF upgrade project caused strong demands for new ML optics, in particular dynamically bent KB focusing devices requiring very precise and steeply graded ML coatings. Thanks to this technology, the ESRF nano-imaging end-station ID22NI now provides the users with spot sizes of the order of 50×50 nm 2 at a photon flux of 10 12 ph/s. Among various in-house research and development activities the study of stress evolution during thin film and ML growth will be highlighted. Additional projects involving a PhD student and a PostDoc fellow cover the fields of wave optical simulations using curved MLs and the exposure of ML based monochromators to the white beam.

  1. E.O.L Eguavoen A SURVEY OF LIBRARY EQUIPMENTS IN ...

    African Journals Online (AJOL)

    The data were collated, analyzed and interpreted based on standard statistical method. ... Keywords: Library equipment, academic libraries, Ibadan, Oyo State ... (1992), facilities constitute a strategic factor in organizational functioning. ... through provision of safe structure, adequate sanitary facilities, a balanced visual.

  2. 28 CFR 540.41 - Visiting facilities.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Visiting facilities. 540.41 Section 540... WITH PERSONS IN THE COMMUNITY Visiting Regulations § 540.41 Visiting facilities. The Warden shall have... have a portion of the visiting room equipped and set up to provide facilities for the children of...

  3. Radiological safety of decayed source removal facility (DSRF) - an overview

    International Nuclear Information System (INIS)

    Rajput, Raksha; George, Jain Reji; Pathak, B.K.

    2018-01-01

    Industrial radiography is one of the major applications of radioisotope in engineering industry for Non-Destructive Testing (NDT). The equipment used for this purpose is called Industrial Radiography Exposure Device (IGRED) or radiography (RG) camera. In India, more than 1800 IGREDs including imported cameras are being used in NDT industry. These cameras are of different types and have various capacities to house different radioisotopes. Generally, 192 Ir sources are being used for NDT work. The sources are being supplied by BRIT to the users. After the useful period of the utilization of gamma intensity, the decayed source is returned to BRIT in RG camera. The decayed source is removed from the camera in the Decayed Source Removal Facility (DSRF). This facility serves the purpose of a miniature hot-cell with the capability of storing the decayed sources which are removed from the cameras. The empty camera is inspected for its mechanical functions and sent to BRIT's hot-cell for loading the new source. DSRF is situated at BRIT Vashi Complex. This paper deals with the radiological safety in the operation of DSRF for removing decayed sources from industrial radiography cameras

  4. Hot cell verification facility update

    International Nuclear Information System (INIS)

    Titzler, P.A.; Moffett, S.D.; Lerch, R.E.

    1985-01-01

    The Hot Cell Verification Facility (HCVF) provides a prototypic hot cell mockup to check equipment for functional and remote operation, and provides actual hands-on training for operators. The facility arrangement is flexible and assists in solving potential problems in a nonradioactive environment. HCVF has been in operation for six years, and the facility is a part of the Hanford Engineering Development Laboratory

  5. Defense waste processing facility radioactive operations. Part 1 - operating experience

    International Nuclear Information System (INIS)

    Little, D.B.; Gee, J.T.; Barnes, W.M.

    1997-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the nation's first and the world's largest vitrification facility. Following a ten year construction program and a 3 year non-radioactive test program, DWPF began radioactive operations in March 1996. This paper presents the results of the first 9 months of radioactive operations. Topics include: operations of the remote processing equipment reliability, and decontamination facilities for the remote processing equipment. Key equipment discussed includes process pumps, telerobotic manipulators, infrared camera, Holledge trademark level gauges and in-cell (remote) cranes. Information is presented regarding equipment at the conclusion of the DWPF test program it also discussed, with special emphasis on agitator blades and cooling/heating coil wear. 3 refs., 4 figs

  6. Use of full recovery hydrolasing equipment for facility decommissioning - 16325

    International Nuclear Information System (INIS)

    Martin, Scott A.; Adams, Scott R.

    2009-01-01

    The removal of surface contamination is a major challenge for nearly all nuclear facilities undergoing, or awaiting, decommissioning. Conventional means of surface decontamination can expose workers to unnecessary hazards, and are often not fit-for-purpose due to size constraints or weight restrictions. Additionally, conventional methods are not always easily deployed remotely due to their complexity or required services. The use of ultra high pressure water for surface decontamination, known as hydrolasing, is recognized as a technology which can be used in various applications requiring surface removal. Hydrolasing is an advantageous technology for many reasons including its versatility, overall simplicity and relative ease of remote deployment. For the nuclear industry, one of the largest challenges with regards to the use of hydrolasing is the requirement for the full recovery of the injected water and removed solids. For nonnuclear applications, there is often no requirement for recovery of the liquid and solid waste, which has led to few system designs which will recover the waste in full. S.A. Robotics' experience with the deployment of ultra high pressure water systems for nuclear applications has shown that full recovery of injected water and removed solids is achievable in both underwater and in-air applications. Innovative equipment and system design have allowed S.A. Robotics' hydrolasing systems to achieve near 100% solid and liquid recovery during concrete hydrolasing. This technology has been deployed for Fluor Hanford at Hanford's K-Basins, as well as for UKAEA as part of the Windscale Piles decommissioning project. The purpose of this paper is to provide a short description of the hydrolasing process and the associated waste issues, describe the unique design features of S.A. Robotics' hydrolasing systems which combat these issues, and provide an overview of two of the hydrolasing projects that S.A. Robotics has completed. (authors)

  7. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  8. Play Equipment, Physical Activity Opportunities, and Children's Activity Levels at Childcare

    Directory of Open Access Journals (Sweden)

    Jessica S. Gubbels

    2012-01-01

    Full Text Available This study investigated the association between physical activity facilities at childcare (e.g., play equipment and physical activity of 2- and 3-year olds. Observations of physical activity intensity were performed among 175 children at 9 childcare centers in The Netherlands, using the OSRAC-P. The physical activity facilities were assessed for indoors and outdoors separately, using the EPAO instrument. Regular (single-level multivariate and multilevel linear regression analyses examined the association of the facilities and child characteristics (age and sex with children's activity levels. Various physical activity facilities were available in all childcare centers (e.g., balls. Riding toys and a small playing area were associated with lower indoor physical activity levels. Outdoor physical activity levels were positively associated with the availability of portable jumping equipment and the presence of a structured track on the playground. Portable slides, fixed swinging equipment, and sandboxes were negatively associated with outdoor activity levels. In addition, the 3-year old children were more active outdoors than the 2-year olds. In conclusion, not all physical activity facilities at childcare were indeed positively associated with children's activity levels. The current findings provide concrete leads for childcare providers regarding which factors they can improve in the physical environment to facilitate children's physical activity.

  9. Facilities for the production and processing of radioisotopes

    International Nuclear Information System (INIS)

    Fourie, P.J.

    1980-01-01

    Radioisotopes which are used in South Africa are produced in the nuclear reactor SAFARI 1 of the AEB and the CSIR cyclotron in Pretoria or are being imported from various overseas manufactures. The safe and efficient production and use of radioisotopes is possible when being handled by sufficiently trained personnel using special designed equipment and facilities. The Isotope Production Centre is situated next to the reactor and waste treatment buildings. New production facilities shielded with lead and equipped with remote handling equipment are being erected and will be commissioned early during 1980 [af

  10. Water Supply and Sanitation Facility Accessibility in Off-Campus ...

    African Journals Online (AJOL)

    Water Supply and Sanitation Facility Accessibility in Off-Campus Houses ... on drinking water source, rate of illness, type and usage of sanitation facilities. ... wells, unprotected dug wells; while others during the wet season harvest rain water.

  11. Atlanta Gas Light opts for an in-house AM/FM

    International Nuclear Information System (INIS)

    Hull, S.R.

    1993-01-01

    Atlanta Gas Light Co. has completed facilities conversion for the first of nine planned implementations of its automated mapping/facilities management mapping/facilities management system, the Facilities and Land Base Automated Mapping Environment or FLAME. Facilities conversion is generally the most costly and time-consuming phase of an AM/FM project. Many companies decide to rely totally on outside expertise for this phase because of the complexity of the process an the resources required to complete it. Atlanta Gas Light decided to take an alternate approach by performing the facilities conversion process in-house for the first implementation, than having an outside vendor carrying out a future implementation and compare the two

  12. Outline of new extra high voltage research equipment at Kumatori research laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Hohki, S; Ikeda, G

    1965-01-01

    Following up the construction in 1939 of an ehv research laboratory, another new research laboratory was established at Kumatori with a ground area of 142,000 square meters. As the first stage of this construction plan, the new research equipment was installed in November 1963 and began operation. The laboratory consists of comprehensive ehv research equipment and facilities relating to atomic energy. The former includes a 6000-kV impulse voltage generator, a 1650-kV alternating current testing transformer, a 300-m overhead transmission test line, a tower strength testing facility, and other various high-power test facilities. Studies on a 400- to 500-kV overhead power transmission system and other new transmission systems are currently being conducted. The details of the construction of the ehv research equipment together with the research policy for future ehv engineering are given.

  13. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  14. Environmental Control Plan for the Industrial Hygiene Field Services Facility

    International Nuclear Information System (INIS)

    Donnelly, J.W.

    2000-01-01

    This environmental control plan is for the Hanford Site's Industrial Hygiene Field Services Facility, located in the 100-N Area. This facility is used for the maintenance and storage of respirators, respiratory equipment and testing, calibration and testing of industrial hygiene equipment, and asbestos fiber counting

  15. Atmospheric Radiation Measurement Program facilities newsletter, January 2001.; TOPICAL

    International Nuclear Information System (INIS)

    Holdridge, D. J.

    2001-01-01

    In the realm of global climate modeling, numerous variables affect the state of the atmosphere and climate. One important area is soil moisture and temperature. The ARM Program uses several types of instruments to gather soil moisture information. An example is the soil water and temperature system (SWATS). A SWATS is located at each of 21 extended facility sites within the CART site boundary. Each system is configured to measure soil moisture and temperature at eight distinct subsurface levels. A special set of probes used in the SWATS measures soil temperature, soil-water potential, and volumetric water content. Sensors are placed at eight different depths below the soil surface, starting at approximately 5 cm (2 in.) below the surface and ending as deep as 175 cm (69 in.). Each site has two identical sets of probes buried 1 m (3.3 ft) apart, to yield duplicate measurements as a quality control measure. At some sites, impenetrable soil or rock layers prevented installation of probes at the deeper levels. The sensors are connected to an electronic data logger that collects and stores the data. Communication equipment transfers data from the site. All of the electronic equipment is housed in a weatherproof enclosure mounted on a concrete slab

  16. Public Housing: A Tailored Approach to Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J. [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Conlin, F. [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Podorson, D. [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Alaigh, K. [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States); Davis, T. [Advanced Residential Integrated Energy Solutions Collaborative, New York, NY (United States)

    2016-02-18

    Over one million HUD-supported public housing units provide rental housing for eligible low-income families across the country. A survey of over 100 public housing authorities (PHAs) across the country indicated that there is a high level of interest in developing low-cost solutions that improve energy efficiency and can be seamlessly included in the refurbishment process. Further, PHAs, have incentives (both internal and external) to reduce utility bills. ARIES worked with four PHAs to develop packages of energy efficiency retrofit measures the PHAs can cost-effectively implement with their own staffs in the normal course of housing operations at the time when units are refurbished between occupancies. The energy efficiency turnover protocols emphasized air infiltration reduction, duct sealing, and measures that improve equipment efficiency. ARIES documented implementation in 18 housing units. Reductions in average air leakage were 16% and duct leakage reductions averaged 23%. Total source energy consumption savings due to implemented measures was estimated at 3-10% based on BEopt modeling with a simple payback of 1.6 to 2.5 years. Implementation challenges were encountered mainly related to required operational changes and budgetary constraints. Nevertheless, simple measures can feasibly be accomplished by PHA staff at low or no cost. At typical housing unit turnover rates, these measures could impact hundreds of thousands of units per year nationally.

  17. Public Housing: A Tailored Approach to Energy Retrofits

    Energy Technology Data Exchange (ETDEWEB)

    Dentz, J.; Conlin, F.; Podorson, D.; Alaigh, K.

    2014-06-01

    Over one million HUD-supported public housing units provide rental housing for eligible low-income families across the country. A survey of over 100 PHAs across the country indicated that there is a high level of interest in developing low cost solutions that improve energy efficiency and can be seamlessly included in the refurbishment process. Further, PHAs, have incentives (both internal and external) to reduce utility bills. ARIES worked with two public housing authorities (PHAs) to develop packages of energy efficiency retrofit measures the PHAs can cost effectively implement with their own staffs in the normal course of housing operations at the time when units are refurbished between occupancies. The energy efficiency turnover protocols emphasized air infiltration reduction, duct sealing and measures that improve equipment efficiency. ARIES documented implementation in ten housing units. Reductions in average air leakage were 16-20% and duct leakage reductions averaged 38%. Total source energy consumption savings was estimated at 6-10% based on BEopt modeling with a simple payback of 1.7 to 2.2 years. Implementation challenges were encountered mainly related to required operational changes and budgetary constraints. Nevertheless, simple measures can feasibly be accomplished by PHA staff at low or no cost. At typical housing unit turnover rates, these measures could impact hundreds of thousands of unit per year nationally.

  18. Powder Metallurgy Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The facility is uniquely equipped as the only laboratory within DA to conduct PM processing of refractory metals and alloys as well as the processing of a wide range...

  19. Oil and gas products and energy equipment

    International Nuclear Information System (INIS)

    1996-01-01

    The planned activities of the Canadian oil and gas products and energy equipment industry for 1996-1997, were presented. The sector is made up of approximately 1500 small and medium sized enterprises. The Canadian oil field manufacturing and servicing industry holds only a small 2.5% share of the world export market, but it is recognized internationally as one of the leading suppliers of advanced petroleum equipment. Their exports include specialized equipment for extracting oil sands, gathering and treatment facilities for sour gas, underbalanced drilling technologies, equipment for wells experiencing declining production rates, top motor drives, winter drilling rigs, and horizontal drilling technologies. They also offer petroleum industry software products. Most exploration and production equipment sold abroad by Canadian firms is manufactured in Canada, but there is an increasing trend toward manufacturing in the country of operation. 2 tabs

  20. Reverse Ballistic Air Gun Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This custom-designed facility houses a suite of three air guns capable of generating accelerations up to 100,000 Gs and velocities up to 2,000 ft/s. In addition to a...

  1. Development of a telerobotic system for handling contaminated process equipment

    International Nuclear Information System (INIS)

    Fisher, J.J.; Ward, C.R.; Schuler, T.F.

    1987-01-01

    E. I. du Pont de Nemours and Company is evaluating a unique eight-degree-of-freedom Telerobot manipulator to perform size-reduction and material handling operations on contaminated process equipment at the Savannah River Plant (SRP). The Telerobot will be installed in the proposed Transuranic (TRU) Waste Processing Facility, which is scheduled to be operational by 1990. A full-scale prototype Telerobot, manufactured by GCA Corporation, St. Paul, MN is being tested with other process equipment in the Components Test Facility at the Savannah River Laboratory (SRL). All telerobotic operations required in the TRU Waste Facility such as crate unpacking, equipment dismantling, material size-reduction, and selected maintenance operations are being tested. This paper discusses the major mechanical and control features of the Telerobot system. Several system enhancements were added by SRL, including a new quick-hand-change coupling and expanded software control functions. The new software enables a system operator to perform both teleoperated and automatic tasks through several operating modes. These enhancements, as well as future mechanical, control system, and software features, are reviewed

  2. 49 CFR 231.27 - Box and other house cars without roof hatches or placed in service after October 1, 1966.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Box and other house cars without roof hatches or... SAFETY APPLIANCE STANDARDS § 231.27 Box and other house cars without roof hatches or placed in service...) Number. (i) Each box or other house car without roof hatches shall be equipped with an efficient vertical...

  3. Advanced Materials Growth and Processing Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This most extensive of U.S. Army materials growth and processing facilities houses seven dedicated, state-of-the-art, molecular beam epitaxy and three metal organic...

  4. Research on the organization of equipment of nuclear emergency

    International Nuclear Information System (INIS)

    Li Xiaoming; Yang Jun

    2012-01-01

    The emergency rescue operation on major accident of nuclear facilities contains four kinds of abilities that are command and control, radiation protection, radiation monitoring and radioactive decontamination, so it needs to organize some equipment of nuclear emergency to enhance the efficiency of nuclear emergency operation. The organization of equipment of nuclear emergency should accord to the reality of the development in our country. It should have extractive structure, brief variety and advance capability, and also should be convenient, useful and adequate. The method of organization can first accord to the organization of group and organize the facilities accord to the organization of group of the emergency rescue force. (authors)

  5. 21 CFR 58.43 - Animal care facilities.

    Science.gov (United States)

    2010-04-01

    ... testing facility shall have a sufficient number of animal rooms or areas, as needed, to assure proper: (1... (4) routine or specialized housing of animals. (b) A testing facility shall have a number of animal... shall exist for the collection and disposal of all animal waste and refuse or for safe sanitary storage...

  6. Current status of collaborative relationships between dialysis facilities and dental facilities in Japan: results of a nationwide survey.

    Science.gov (United States)

    Yoshioka, Masami; Shirayama, Yasuhiko; Imoto, Issei; Hinode, Daisuke; Yanagisawa, Shizuko; Takeuchi, Yuko

    2015-02-12

    Recent studies have reported an association between periodontal disease and mortality among dialysis patients. Therefore, preventive dental care should be considered very important for this population. In Japan, no systematic education has been undertaken regarding the importance of preventive dental care for hemodialysis patients--even though these individuals tend to have oral and dental problems. The aim of this study was to investigate the current state of collaborative relationships between hemodialysis facilities and dental services in Japan and also to identify strategies to encourage preventive dental visits among hemodialysis outpatients. A nationwide questionnaire on the collaborative relationship between dialysis facilities and dental facilities was sent by mail to all medical facilities in Japan offering outpatient hemodialysis treatment. Responses were obtained from 1414 of 4014 facilities (35.2%). Among the 1414 facilities, 272 (19.2%) had a dental service department. Approximately 100,000 dialysis outpatients were receiving treatment at these participating facilities, which amounts to one-third of all dialysis patients in Japan. Of those patients, 82.9% received hemodialysis at medical facilities without dental departments. Only 87 of 454 small clinics without in-house dental departments (19.2%) had collaborative registered dental clinics. Medical facilities with registered dental clinics demonstrated a significantly more proactive attitude to routine collaboration on dental matters than facilities lacking such clinics. Our nationwide survey revealed that most dialysis facilities in Japan have neither an in-house dental department nor a collaborative relationship with a registered dental clinic. Registration of dental clinics appears to promote collaboration with dental facilities on a routine basis, which would be beneficial for oral health management in hemodialysis patients.

  7. Outline of NUCEF facility

    International Nuclear Information System (INIS)

    Takeshita, Isao

    1996-01-01

    NUCEF is a multipurpose research facility in the field of safety and advanced technology of nuclear fuel cycle back-end. Various experiment facilities and its supporting installations, in which nuclear fuel materials, radio isotopes and TRU elements can be handled, are arranged in more than one hundred rooms of two experiment buildings. Its construction was completed in middle of 1994 and hot experiments have been started since then. NUCEF is located on the site (30,000 m 2 ) of southeastern part in the Tokai Research Establishment of JAERI facing to the Pacific Ocean. The base of Experiment Buildings A and B was directly founded on the rock existing at 10-15 m below ground level taking the aseismatic design into consideration. Each building is almost same sized and composed of one basement and three floors of which area is 17,500 m 2 in total. In the basement, there are exhaust facilities of ventilation system, treatment system of solution fuel and radioactive waste solution and storage tanks of them. Major experiment facilities are located on the first or the second floors in each building. An air-inlet facility of ventilation system for each building is equipped on the third floor. Most of experiment facilities for criticality safety research including two critical facilities: Static Experiment Critical Facility (STACY) and Transient Experiment Critical Facility (TRACY) are installed in Experiment Building A. Experiment equipments for research on advanced fuel reprocessing process and on TRU waste management, which are named BECKY (Back End Fuel Cycle Key Elements Research Facility), are installed in laboratories and a-g cells in Experiment Building B. (J.P.N.)

  8. Air pollution control system testing at the DOE offgas components test facility

    International Nuclear Information System (INIS)

    Burns, D.B.; Speed, D.; VanPelt, W.; Burns, H.H.

    1997-01-01

    In 1997, the Department of Energy (DOE) Savannah River Site (SRS) plans to begin operation of the Consolidated Incineration Facility (CIF) to treat solid and liquid RCRA hazardous and mixed wastes. The Savannah River Technology Center (SRTC) leads an extensive technical support program designed to obtain incinerator and air pollution control equipment performance data to support facility start-up and operation. A key component of this technical support program includes the Offgas Components Test Facility (OCTF), a pilot-scale offgas system test bed. The primary goal for this test facility is to demonstrate and evaluate the performance of the planned CIF Air Pollution Control System (APCS). To accomplish this task, the OCTF has been equipped with a 1/10 scale CIF offgas system equipment components and instrumentation. In addition, the OCTF design maximizes the flexibility of APCS operation and facility instrumentation and sampling capabilities permit accurate characterization of all process streams throughout the facility. This allows APCS equipment performance to be evaluated in an integrated system under a wide range of possible operating conditions. This paper summarizes the use of this DOE test facility to successfully demonstrate APCS operability and maintainability, evaluate and optimize equipment and instrument performance, and provide direct CIF start-up support. These types of facilities are needed to permit resolution of technical issues associated with design and operation of systems that treat and dispose combustible hazardous, mixed, and low-level radioactive waste throughout and DOE complex

  9. In Vivo Radiobioassay and Research Facility

    International Nuclear Information System (INIS)

    Lynch, Timothy P.

    2011-01-01

    Bioassay monitoring for intakes of radioactive material is an essential part of the internal dosimetry program for radiation workers at the Department of Energy's (DOE) Hanford Site. This monitoring program includes direct measurements of radionuclides in the body by detecting photons that exit the body and analyses of radionuclides in excreta samples. The specialized equipment and instrumentation required to make the direct measurements of these materials in the body are located at the In Vivo Radiobioassay and Research Facility (IVRRF). The IVRRF was originally built in 1960 and was designed expressly for the in vivo measurement of radioactive material in Hanford workers. Most routine in vivo measurements are performed annually and special measurements are performed as needed. The primary source terms at the Hanford Site include fission and activation products (primarily 137Cs and 90Sr), uranium, uranium progeny, and transuranic radionuclides. The facility currently houses five shielded counting systems, men's and women's change rooms and an instrument maintenance and repair shop. Four systems include high purity germanium detectors and one system utilizes large sodium iodide detectors. These systems are used to perform an average of 7,000 measurements annually. This includes approximately 5000 whole body measurements analyzed for fission and activation products and 2000 lung measurements analyzed for americium, uranium, and plutonium. Various other types of measurements are performed periodically to estimate activity in wounds, the thyroid, the liver, and the skeleton. The staff maintains the capability to detect and quantify activity in essentially any tissue or organ. The in vivo monitoring program that utilizes the facility is accredited by the Department of Energy Laboratory Accreditation Program for direct radiobioassay.

  10. Summary of detailed energy audit and building simulation on archetype sustainable house, Woodbridge ON

    Energy Technology Data Exchange (ETDEWEB)

    Fung, A. [Ryerson Polytechnic Univ., Toronto, ON (Canada). Dept. of Mechanical and Industrial Engineering; Dembo, A.; Zhou, J. [Ryerson Polytechnic Univ., Toronto, ON (Canada). Dept. of Architectural Science

    2009-07-01

    This paper described energy and audit and building simulations conducted on an archetype sustainable house located in Woodbridge, Ontario. The house formed part of a project to construct low energy, sustainable house designs for mass production. The 2 houses formed a duplex. House A was designed using current best design practices, while house B was equipped with advanced and innovative technologies not commonly used in residential constructions. Natural Resources Canada's (NRCan) HOT2000 residential building simulation program was used to evaluate the performance of both houses in the duplex. The simulation program demonstrated that house B performed more efficiently than house A. However, neither houses met their designed values. Significantly larger space heating and cooling loads were identified. The program showed that additional weather-stripping around doors, and caulking around windows will help to reduce the amount of draft in the houses. Assessments are also needed to measure heat losses from the common wall in the basement. It was concluded that the energy performance of the house can be optimized by using the appropriate sealing techniques throughout the building envelope. 2 refs., 1 tab.

  11. Indoor radon in three similar two-story houses with different ventilation systems

    International Nuclear Information System (INIS)

    Kokotti, H.; Savolainen, T.; Raunemaa, T.; Kalliokoski, P.

    1989-01-01

    Radon levels were monitored in three similar two-story apartment houses which were located side by side on a gravel esker in eastern Finland. The houses differed only in regard to their ventilation systems which included the following: natural ventilation, mechanical exhaust, and complete mechanical ventilation. The study started immediately when the houses were finished and was continued for two years. Radon concentrations were highest (60-430 Bq/m 3 ) in the beginning of the study period before the tenants moved in. During the following spring and fall, average radon levels of the houses decreased below 100 Bq/m 3 . Radon concentrations varied within a wide range, from 20 to 230 Bq/m 3 , in the apartments. Among the houses, the highest concentrations were found in the house equipped with mechanical exhaust ventilation and the lowest in the house with both a mechanical supply and exhaust system. One reason for the decreasing levels of radon after a one-year occupancy was that the tenants increased the ventilation of their apartments. In the house with complete mechanical ventilation, the stability of ventilation also contributed to the decrease of the indoor radon level

  12. Catalytic Fuel Conversion Facility

    Data.gov (United States)

    Federal Laboratory Consortium — This facility enables unique catalysis research related to power and energy applications using military jet fuels and alternative fuels. It is equipped with research...

  13. 9 CFR 3.126 - Facilities, indoor.

    Science.gov (United States)

    2010-01-01

    ..., vents, fans, or air-conditioning and shall be ventilated so as to minimize drafts, odors, and moisture condensation. (c) Lighting. Indoor housing facilities shall have ample lighting, by natural or artificial means...

  14. Low Speed Wind Tunnel Facility (LSWTF)

    Data.gov (United States)

    Federal Laboratory Consortium — Description: This facility consists of a large-scale, low-speed open-loop induction wind tunnel which has been modified to house a linear turbine cascade. A 125-hp...

  15. NPP capital equipment life control facilities and tools

    International Nuclear Information System (INIS)

    Nekrasov, A.V.; Proskuryakov, K.N.

    2009-01-01

    Algorithms and simulation package for calculation of eigen modes of coolant pressure oscillations in equipment of primary coolant circuit of WWER-1000 NPP, tuned-circuit Q-factor of an oscillating contour of the coolant, fluctuation frequencies pass band and attenuation factors of were developed. Calculation results for cases of presence and absence of gaseous state radiolysis products in the coolant were obtained. Results analysis makes it possible to disclose operating conditions which result in raised vibrations, and to develop control response in NPP industrial control system for their prevention [ru

  16. Methods and equipments used in power reactors

    International Nuclear Information System (INIS)

    Beraha, R.; Delevallee, A.

    1976-01-01

    The various reactor γ fuel scanning facilities presently operating around the world are reviewed. Both equipments proposed by FRAMATOME are described: one is intended for scanning removable fuel pencils, and the other one for fuel assembly scanning [fr

  17. EHS Open House: Learning Lab and Life Safety | Poster

    Science.gov (United States)

    Attendees of the Environment, Health, and Safety Program’s (EHS’) Open House had a chance to learn self-defense techniques, as well as visit with vendors demonstrating the latest trends in laboratory safety. “Working with sharps in labs is inherently dangerous, so EHS proactively focused on featuring equipment that would promote safer techniques,” said Siobhan Tierney, program

  18. 75 FR 41877 - Insured Healthcare Facilities 232 Loan Application

    Science.gov (United States)

    2010-07-19

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-65] Insured Healthcare Facilities 232 Loan Application AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY... Proposal: Insured Healthcare Facilities 232 Loan Application. OMB Approval Number: 2502-New. Form Numbers...

  19. 75 FR 16821 - Insured Healthcare Facilities 232 Loan Application

    Science.gov (United States)

    2010-04-02

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-23] Insured Healthcare Facilities 232 Loan Application AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY...: Title of Proposal: Insured Healthcare Facilities 232 Loan Application. OMB Approval Number: 2502-New...

  20. Method and equipment for treating waste water resulting from the technological testing processes of NPP equipment

    International Nuclear Information System (INIS)

    Radulescu, M. C.; Valeca, S.; Iorga, C.

    2016-01-01

    Modern methods and technologies coupled together with advanced equipment for treating residual substances resulted from technological processes are mandatory measures for all industrial facilities. The correct management of the used working agents and of the all wastes resulted from the different technological process (preparation, use, collection, neutralization, discharge) is intended to reduce up to removal of their potential negative impact on the environment. The high pressure and temperature testing stands from INR intended for functional testing of nuclear components (fuel bundles, fuelling machines, etc.) were included in these measures since the use of oils, demineralized water chemically treated, greases, etc. This paper is focused on the method and equipment used at INR Pitesti in the chemical treatment of demineralized waters, as well as the equipment for collecting, neutralizing and discharging them after use. (authors)

  1. Environmental Control Plan for the Industrial Hygiene Field Services Facility; TOPICAL

    International Nuclear Information System (INIS)

    J. W. Donnelly

    2001-01-01

    This environmental control plan is for the Hanford Site's industrial hygiene field services facility, located in the 100-N Area. The facility is used for the maintenance and storage of respirators, respiratory equipment and testing, calibration and testing of industrial hygiene equipment, and asbestos fiber counting

  2. 47 CFR 68.110 - Compatibility of the public switched telephone network and terminal equipment.

    Science.gov (United States)

    2010-10-01

    ... changes in its communications facilities, equipment, operations or procedures, where such action is... in this part. If such changes can be reasonably expected to render any customer's terminal equipment... network and terminal equipment. 68.110 Section 68.110 Telecommunication FEDERAL COMMUNICATIONS COMMISSION...

  3. Radiological performance assessment for the E-Area Vaults Disposal Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cook, J.R.; Hunt, P.D. [Westinghouse Savannah River Co., Aiken, SC (United States)

    1994-04-15

    The E-Area Vaults (EAVs) located on a 200 acre site immediately north of the current LLW burial site at Savannah River Site will provide a new disposal and storage site for solid, low-level, non-hazardous radioactive waste. The EAV Disposal Facility will contain several large concrete vaults divided into cells. Three types of structures will house four designated waste types. The Intermediate Level Non-Tritium Vaults will receive waste radiating greater than 200 mR/h at 5 cm from the outer disposal container. The Intermediate Level Tritium Vaults will receive waste with at least 10 Ci of tritium per package. These two vaults share a similar design, are adjacent, share waste handling equipment, and will be closed as one facility. The second type of structure is the Low Activity Waste Vaults which will receive waste radiating less than 200 mR/h at 5 cm from the outer disposal container and containing less than 10 Ci of tritium per package. The third facility, the Long Lived Waste Storage Building, provides covered, long term storage for waste containing long lived isotopes. Two additional types of disposal are proposed: (1) trench disposal of suspect soil, (2) naval reactor component disposal. To evaluate the long-term performance of the EAVs, site-specific conceptual models were developed to consider: (1) exposure pathways and scenarios of potential importance; (2) potential releases from the facility to the environment; (3) effects of degradation of engineered features; (4) transport in the environment; (5) potential doses received from radionuclides of interest in each vault type.

  4. Radiological performance assessment for the E-Area Vaults Disposal Facility

    International Nuclear Information System (INIS)

    Cook, J.R.; Hunt, P.D.

    1994-01-01

    The E-Area Vaults (EAVs) located on a 200 acre site immediately north of the current LLW burial site at Savannah River Site will provide a new disposal and storage site for solid, low-level, non-hazardous radioactive waste. The EAV Disposal Facility will contain several large concrete vaults divided into cells. Three types of structures will house four designated waste types. The Intermediate Level Non-Tritium Vaults will receive waste radiating greater than 200 mR/h at 5 cm from the outer disposal container. The Intermediate Level Tritium Vaults will receive waste with at least 10 Ci of tritium per package. These two vaults share a similar design, are adjacent, share waste handling equipment, and will be closed as one facility. The second type of structure is the Low Activity Waste Vaults which will receive waste radiating less than 200 mR/h at 5 cm from the outer disposal container and containing less than 10 Ci of tritium per package. The third facility, the Long Lived Waste Storage Building, provides covered, long term storage for waste containing long lived isotopes. Two additional types of disposal are proposed: (1) trench disposal of suspect soil, (2) naval reactor component disposal. To evaluate the long-term performance of the EAVs, site-specific conceptual models were developed to consider: (1) exposure pathways and scenarios of potential importance; (2) potential releases from the facility to the environment; (3) effects of degradation of engineered features; (4) transport in the environment; (5) potential doses received from radionuclides of interest in each vault type

  5. Facility effluent monitoring plan for the 325 Facility

    International Nuclear Information System (INIS)

    1998-01-01

    The Applied Chemistry Laboratory (325 Facility) houses radiochemistry research, radioanalytical service, radiochemical process development, and hazardous and mixed hazardous waste treatment activities. The laboratories and specialized facilities enable work ranging from that with nonradioactive materials to work with picogram to kilogram quantities of fissionable materials and up to megacurie quantities of other radionuclides. The special facilities include two shielded hot-cell areas that provide for process development or analytical chemistry work with highly radioactive materials, and a waste treatment facility for processing hazardous, mixed, low-level, and transuranic wastes generated by Pacific Northwest Laboratory. Radioactive material storage and usage occur throughout the facility and include a large number of isotopes. This material is in several forms, including solid, liquid, particulate, and gas. Some of these materials are also heated during testing which can produce vapors. The research activities have been assigned to the following activity designations: High-Level Hot Cell, Hazardous Waste Treatment Unit, Waste Form Development, Special Testing Projects, Chemical Process Development, Analytical Hot Cell, and Analytical Chemistry. The following summarizes the airborne and liquid effluents and the results of the Facility Effluent Monitoring Plan (FEMP) determination for the facility. The complete monitoring plan includes characterization of effluent streams, monitoring/sampling design criteria, a description of the monitoring systems and sample analysis, and quality assurance requirements

  6. Seismic engineering for an expanded tritium facility at Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Volkman, D.E.; Olive, W.B.; Endebrocid, E.E.; Khan, P.K.; Rebillet, W.R.

    1997-10-01

    An existing complex of three single story concrete and masonry shear wall buildings will be integrated into an expanded tritium facility for neutron tube target loading. Known as the NTTL Project, the expanded plant is a major element of the Department of Energy's tritium program at the Los Alamos National Laboratory. This paper describes seismic evaluation and upgrade modifications for the 1950's concrete shear wall building; drift analyses of two 1980's CMU [concrete masonry unit] shear wall buildings; design of a new CMU shear wall building linking existing structures and providing personnel change room services; and design of a new steel frame building housing HVAC and electrical power and communication equipment for the complex. All buildings are closely adjacent and drift analysis to establish separation to prevent pounding is a major seismic engineering concern for the project

  7. Environmental Test Facility (ETF)

    Data.gov (United States)

    Federal Laboratory Consortium — The Environmental Test Facility (ETF) provides non-isolated shock testing for stand-alone equipment and full size cabinets under MIL-S-901D specifications. The ETF...

  8. Gas phase decontamination of gaseous diffusion process equipment

    International Nuclear Information System (INIS)

    Bundy, R.D.; Munday, E.B.; Simmons, D.W.; Neiswander, D.W.

    1994-01-01

    D ampersand D of the process facilities at the gaseous diffusion plants (GDPs) will be an enormous task. The EBASCO estimate places the cost of D ampersand D of the GDP at the K-25 Site at approximately $7.5 billion. Of this sum, nearly $4 billion is associated with the construction and operation of decontamination facilities and the dismantlement and transport of contaminated process equipment to these facilities. In situ long-term low-temperature (LTLT) gas phase decontamination is being developed and demonstrated at the K-25 site as a technology that has the potential to substantially lower these costs while reducing criticality and safeguards concerns and worker exposure to hazardous and radioactive materials. The objective of gas phase decontamination is to employ a gaseous reagent to fluorinate nonvolatile uranium deposits to form volatile LJF6, which can be recovered by chemical trapping or freezing. The LTLT process permits the decontamination of the inside of gas-tight GDP process equipment at room temperature by substituting a long exposure to subatmospheric C1F for higher reaction rates at higher temperatures. This paper outlines the concept for applying LTLT gas phase decontamination, reports encouraging laboratory experiments, and presents the status of the design of a prototype mobile system. Plans for demonstrating the LTLT process on full-size gaseous diffusion equipment are also outlined briefly

  9. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    International Nuclear Information System (INIS)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully

  10. Development of maintenance equipment for nuclear material fabrication equipment in a highly active hot cell

    Energy Technology Data Exchange (ETDEWEB)

    Park, J. J.; Yang, M. S.; Kim, K. H. and others

    2000-09-01

    This report presents the development of a maintenance system for a highly contaminated nuclear material handling equipment at a hot-cell. This maintenance system has mainly three subsystems - a gamma-radiation measurement module for detecting a gamma-radiation level and identifying its distribution in-situ, a dry-type decontamination device for cleaning up contaminated particles, and a maintenance chamber for isolating contaminated equipment. The mechanical design considerations, controller, capabilities and remote operation and manipulation of the maintenance system are described. Such subsystems developed were installed and tested in the IMEF (Irradiated Material Examination Facility) M6 hot-cell after mock-up tests and performed their specific tasks successfully.

  11. An audit of some health facilities and equipment for neonatal ...

    African Journals Online (AJOL)

    2016-04-19

    Apr 19, 2016 ... fifteen countries including Nigeria where 80% of mater- nal and newborn ... per 1000 live births and an under-five mortality rate of. 102 per 1000 live .... southern Nigeria. The distribution of equipments for basic neonatal resus-.

  12. Developing a Comprehensive Housing Strategy: A Case Study

    Science.gov (United States)

    Marsters, Tim; Bliss, Kelly

    2007-01-01

    In the current highly competitive higher education market in North America, many colleges have identified the importance of upgrading their existing residential housing facilities as part of their strategy to attract and retain students. The case study discussed in this article describes the successful planning process used by Perkins+Will and…

  13. RECENT PROCESS AND EQUIPMENT IMPROVEMENTS TO INCREASE HIGH LEVEL WASTE THROUGHPUT AT THE DEFENSE WASTE PROCESSING FACILITY (DWPF)

    International Nuclear Information System (INIS)

    Smith, M; Allan Barnes, A; Jim Coleman, J; Robert Hopkins, R; Dan Iverson, D; Richard Odriscoll, R; David Peeler, D

    2006-01-01

    The Savannah River Site's (SRS) Defense Waste Processing Facility (DWPF), the world's largest operating high level waste (HLW) vitrification plant, began stabilizing about 35 million gallons of SRS liquid radioactive waste by-product in 1996. The DWPF has since filled over 2000 canisters with about 4000 pounds of radioactive glass in each canister. In the past few years there have been several process and equipment improvements at the DWPF to increase the rate at which the waste can be stabilized. These improvements have either directly increased waste processing rates or have desensitized the process and therefore minimized process upsets and thus downtime. These improvements, which include glass former optimization, increased waste loading of the glass, the melter glass pump, the melter heated bellows liner, and glass surge protection software, will be discussed in this paper

  14. Wheelchair cleaning and disinfection in Canadian health care facilities: "That's wheelie gross!".

    Science.gov (United States)

    Gardner, Paula; Muller, Matthew P; Prior, Betty; So, Ken; Tooze, Jane; Eum, Linda; Kachur, Oksana

    2014-11-01

    Wheelchairs are complex equipment that come in close contact with individuals at increased risk of transmitting and acquiring antibiotic-resistant organisms and health care-associated infection. The purpose of this study was to determine the status of wheelchair cleaning and disinfection in Canadian health care facilities. Acute care hospitals (ACHs), chronic care hospitals (CCHs), and long-term care facilities (LTCFs) were contacted and the individual responsible for oversight of wheelchair cleaning and disinfection was identified. A structured interview was conducted that focused on current practices and concerns, barriers to effective wheelchair cleaning and disinfection, and potential solutions. Interviews were completed at 48 of the 54 facilities contacted (89%), including 18 ACHs, 16 CCHs, and 14 LTCFs. Most (n = 24) facilities had 50-200 in-house wheelchairs. Respondents were very concerned about wheelchair cleaning as an infection control issue. Specific concerns included the lack of reliable systems for tracking and identifying dirty and clean wheelchairs (71%, 34/48), failure to clean and disinfect wheelchairs between patients (52%, 25/48), difficulty cleaning cushions (42%, 20/48), lack of guidelines (35%, 27/48), continued use of visibly soiled wheelchairs (29%, 14/48) and lack of resources (25%, 12/48). Our results suggest that wheelchair cleaning and disinfection is not optimally performed at many Canadian hospitals and LTCFs. Specific guidance on wheelchair cleaning and disinfection is necessary. Copyright © 2014 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  15. Coastal Inlet Model Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Coastal Inlet Model Facility, as part of the Coastal Inlets Research Program (CIRP), is an idealized inlet dedicated to the study of coastal inlets and equipped...

  16. 24 CFR 91.205 - Housing and homeless needs assessment.

    Science.gov (United States)

    2010-04-01

    ...) Homeless needs. The plan must provide a concise summary of the nature and extent of homelessness (including rural homelessness and chronically homeless persons), addressing separately the need for facilities and...) who are currently housed but threatened with homelessness. The plan also must contain a brief...

  17. A facility for training Space Station astronauts

    Science.gov (United States)

    Hajare, Ankur R.; Schmidt, James R.

    1992-01-01

    The Space Station Training Facility (SSTF) will be the primary facility for training the Space Station Freedom astronauts and the Space Station Control Center ground support personnel. Conceptually, the SSTF will consist of two parts: a Student Environment and an Author Environment. The Student Environment will contain trainers, instructor stations, computers and other equipment necessary for training. The Author Environment will contain the systems that will be used to manage, develop, integrate, test and verify, operate and maintain the equipment and software in the Student Environment.

  18. Equipment for the handling of thorium materials

    International Nuclear Information System (INIS)

    Heisler, S.W. Jr.; Mihalovich, G.S.

    1988-01-01

    The Feed Materials Production Center (FMPC) is the United States Department of Energy's storage facility for thorium. FMPC thorium handling and overpacking projects ensure the continued safe handling and storage of the thorium inventory until final disposition of the materials is determined and implemented. The handling and overpacking of the thorium materials requires the design of a system that utilizes remote handling and overpacking equipment not currently utilized at the FMPC in the handling of uranium materials. The use of remote equipment significantly reduces radiation exposure to personnel during the handling and overpacking efforts. The design system combines existing technologies from the nuclear industry, the materials processing and handling industry and the mining industry. The designed system consists of a modified fork lift truck for the transport of thorium containers, automated equipment for material identification and inventory control, and remote handling and overpacking equipment for material identification and inventory control, and remote handling and overpacking equipment for repackaging of the thorium materials

  19. Practical design of gamma irradiation facility

    International Nuclear Information System (INIS)

    Sugimoto, Sen-ichi

    1976-01-01

    In this report, it is intended to describe mainly the multi-purpose irradiation facilities which carry out the consigned irradiation for the sterilization of medical apparatuses, which is most of the demand of gamma irradiation in Japan. Gamma irradiation criterion is summed up to that ''Apply the specified dose properly and uniformly to product cases and be economic.'' Though the establishment of the design standard for irradiation facilities is not easy and is not solve simply, the factors to be considered in the design are as follows: (1) mechanism safety, (2) multipurpose irradiation structure, (3) irradiation criteria and practice, (4) efficiency of radiation source utilization and related problems, and (5) economical merit. Irradiation facilities are generally itemized as follows: irradiation equipments, radiation source-storing facility, package carrier, radiation source-driving equipments, facilities for safety and operational management and others. Examples and their characteristics are reported for the facilities of Japan Radio-isotope Irradiation Cooperative Association and Radie Industries Ltd. Expenses for construction, processing and radiation sources are shown on the basis of a few references, and the cost trially calculated under a certain presumptive condition is given. (Wakatsuki, Y.)

  20. What housing features should inform the development of housing solutions for adults with neurological disability?: A systematic review of the literature.

    Science.gov (United States)

    Wright, Courtney J; Zeeman, Heidi; Kendall, Elizabeth; Whitty, Jennifer A

    2017-07-01

    Despite the recent emphasis in Australian political, academic, and legislative narratives to more actively promote real housing choice for people with high healthcare and support needs, there is a lack of understanding regarding the specific housing features that might constitute better housing solutions for this population. Inclusive housing provision in Australia rightly emphasises safety and accessibility issues but often fails to incorporate factors related to broader psychosocial elements of housing such as dwelling location, neighbourhood quality, and overall design. While the importance of these broader elements appears obvious, it is not yet clear what specific housing features relate to these elements and how they might contribute to housing solutions for people with high healthcare and support needs. For individuals with complex neurological conditions such as brain injury or cerebral palsy, who require maximum support on a daily basis yet want to live independently and away from a primary care hospital or health facility, a more detailed understanding of the housing features that might influence design and development is needed. Thus, in order to clarify the broader factors related to housing solutions for this population, a systematic review was conducted to identify and synthesise the current research evidence (post-2003) and guide future housing design and development opportunities. From the included studies (n=26), 198 unique housing features were identified. From the 198 features, 142 related to housing design (i.e., internal or external characteristics of the dwelling and its land), 12 related to the dwelling's location (i.e., its proximity to available resources), and 54 related to the nature of the surrounding neighbourhood (i.e., the physical, social, and economic conditions of the area). The findings of this review contribute significantly to the literature by reporting a broader scope of relevant housing features for people with neurological

  1. Air quality impacts due to construction of LWR waste management facilities

    International Nuclear Information System (INIS)

    1977-06-01

    Air quality impacts of construction activities and induced housing growth as a result of construction activities were evaluated for four possible facilities in the LWR fuel cycle: a fuel reprocessing facility, fuel storage facility, fuel fabrication plant, and a nuclear power plant. Since the fuel reprocessing facility would require the largest labor force, the impacts of construction of that facility were evaluated in detail

  2. 9 CFR 590.506 - Candling and transfer-room facilities and equipment.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Candling and transfer-room facilities... INSPECTION ACT) Sanitary, Processing, and Facility Requirements § 590.506 Candling and transfer-room... containers are furnished daily. (h) Shell egg conveyors shall be constructed so that they can be thoroughly...

  3. St. Louis demonstration final report: refuse processing plant equipment, facilities, and environmental evaluations

    Energy Technology Data Exchange (ETDEWEB)

    Fiscus, D.E.; Gorman, P.G.; Schrag, M.P.; Shannon, L.J.

    1977-09-01

    The results are presented of processing plant evaluations of the St. Louis-Union Electric Refuse Fuel Project, including equipment and facilities as well as assessment of environmental emissions at both the processing and the power plants. Data on plant material flows and operating parameters, plant operating costs, characteristics of plant material flows, and emissions from various processing operations were obtained during a testing program encompassing 53 calendar weeks. Refuse derived fuel (RDF) is the major product (80.6% by weight) of the refuse processing plant, the other being ferrous metal scrap, a marketable by-product. Average operating costs for the entire evaluation period were $8.26/Mg ($7.49/ton). The average overall processing rate for the period was 168 Mg/8-h day (185.5 tons/8-h day) at 31.0 Mg/h (34.2 tons/h). Future plants using an air classification system of the type used at the St. Louis demonstration plant will need an emissions control device for particulates from the large de-entrainment cyclone. Also in the air exhaust from the cyclone were total counts of bacteria and viruses several times higher than those of suburban ambient air. No water effluent or noise exposure problems were encountered, although landfill leachate mixed with ground water could result in contamination, given low dilution rates.

  4. Equipment for inspection of austenitic stainless steel pipe welds

    International Nuclear Information System (INIS)

    Boehmer, W.D.; Horn, J.E.

    1979-01-01

    A computer controlled ultrasonic scanning system and a data acquisition and analysis system have been developed to perform the inservice inspection of welds in stainless steel sodium piping in the Fast Flux Test Facility. The scanning equipment consists of a six axis motion mechanism and control system which allows full articulation of an ultrasonic transducer as it follows the circumferential pipe welds. The data acquisition and analysis system consists of high speed ultrasonic waveform digitizing equipment, dedicated processors to perform on-line analysis, and data storage and display equipment

  5. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR (Integral Fast Reactor) program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. (author)

  6. IFR fuel cycle demonstration in the EBR-II Fuel Cycle Facility

    International Nuclear Information System (INIS)

    Lineberry, M.J.; Phipps, R.D.; Rigg, R.H.; Benedict, R.W.; Carnes, M.D.; Herceg, J.E.; Holtz, R.E.

    1991-01-01

    The next major milestone of the IFR program is engineering-scale demonstration of the pyroprocess fuel cycle. The EBR-II Fuel Cycle Facility has just entered a startup phase which includes completion of facility modifications, and installation and cold checkout of process equipment. This paper reviews the design and construction of the facility, the design and fabrication of the process equipment, and the schedule and initial plan for its operation. 5 refs., 4 figs

  7. Overhead remote handling systems for the process facility modifications project

    International Nuclear Information System (INIS)

    Wiesener, R.W.; Grover, D.L.

    1987-01-01

    Each of the cells in the process facility modifications (PFM) project complex is provided with a variety of general purpose remote handling equipment including bridge cranes, monorail hoist, bridge-mounted electromechanical manipulator (EMM) and an overhead robot used for high efficiency particulate air (HEPA) filter changeout. This equipment supplements master-slave manipulators (MSMs) located throughout the complex to provide an overall remote handling system capability. The overhead handling equipment is used for fuel and waste material handling operations throughout the process cells. The system also provides the capability for remote replacement of all in-cell process equipment which may fail or be replaced for upgrading during the lifetime of the facility

  8. Overview - Defense Waste Processing Facility Operating Experience

    International Nuclear Information System (INIS)

    Norton, M.R.

    2002-01-01

    The Savannah River Site's Defense Waste Processing Facility (DWPF) near Aiken, SC is the world's largest radioactive waste vitrification facility. Radioactive operations began in March 1996 and over 1,000 canisters have been produced. This paper presents an overview of the DWPF process and a summary of recent facility operations and process improvements. These process improvements include efforts to extend the life of the DWPF melter, projects to increase facility throughput, initiatives to reduce the quantity of wastewater generated, improved remote decontamination capabilities, and improvements to remote canyon equipment to extend equipment life span. This paper also includes a review of a melt rate improvement program conducted by Savannah River Technology Center personnel. This program involved identifying the factors that impacted melt rate, conducting small scale testing of proposed process changes and developing a cost effective implementation plan

  9. Operations and communications within the Daresbury Nuclear Structure Facility control system

    International Nuclear Information System (INIS)

    Davis, S.V.; Horrabin, C.W.; Johnstone, W.T.; Spurling, K.

    1984-01-01

    The Nuclear Structure Facility at Daresbury is a 20Mv Tandem Van de Graaff heavy ion accelerator. The design of the machine requires beam handling, vacuum, diagnostic and machine control equipment to be distributed within the accelerator in control sections maintained at different high potentials. All equipment also has to withstand huge electrical discharges. It is not possible to communicate directly with equipment across wires and although in previous machines a limited range of control functions have been carried out using electro-mechanical means the number of control and monitoring channels required on the NSF, the limited space, and the hostile environment led to the decision to design a distributed analogue and digital multiplexing system housed in special double screened enclosures. The outstation crates of this system are interconnected by a serial digital communications ring using a mixture of free space or fibre optic infra-red light links, or transformer coupled coaxial cable transmission as appropriate. Each area of the accelerator is served by one A/D multiplex ring of this type which carries the entire data for control and monitoring within that area. The system makes extensive use of micro processors which organize communications over these rings. One crate on each ring provides a port for the connection of a control system computer. The NSF control system is thus based on a computer compatible connection with the accelerator over which all information passes, whatever its purpose within the overall control strategy

  10. Alternatives Generation Analysis Long Length Contaminated Equipment Removal System Storage

    International Nuclear Information System (INIS)

    BOGER, R.M.

    1999-01-01

    Major pieces of Characterization sampling equipment are currently stored outdoors. This includes the Long Length Contaminated Equipment receiver trailer and transportation trailer. A decision is required to determine the preferred alternative for facilities to store and maintain this equipment. The Long Length Contaminated Equipment Removal System (LLCERS) consists of many tools, mechanisms, and controllers currently stored in various locations. Much of this equipment should be protected from the elements while being stored. Some of the LLCERS equipment should be protected with some kind of roof cover. This decision analysis is to determine the best alternative for weather protection for the large equipment requiring a cover. Additional details are included in Sections 2.0 and 5.0. Key assumptions used in this analysis are detailed in Section 3.2

  11. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  12. DeBeNe Test Facilities for Fast Breeder Development

    International Nuclear Information System (INIS)

    Storz, R.

    1980-10-01

    This report gives an overview and a short description of the test facilities constructed and operated within the collaboration for fast breeder development in Germany, Belgium and the Netherlands. The facilities are grouped into Sodium Loops (Large Facilities and Laboratory Loops), Special Equipment including Hot Cells and Reprocessing, Test Facilities without Sodium, Zero Power Facilities and In-pile Loops including Irradiation Facilities

  13. Design and Calibration of a Full Scale Active Magnetic Bearing Based Test Facility for Investigating Rotordynamic Properties of Turbomachinery Seals in Multiphase Flow

    DEFF Research Database (Denmark)

    Voigt, Andreas Jauernik; Mandrup-Poulsen, Christian; Nielsen, Kenny Krogh

    2016-01-01

    of the subsea installed rotating machinery. It is well known that careful design of turbomachinery seals, such as interstage and balance piston seals, is pivotal for the performance of pumps and compressors. Consequently, the ability to predict the complex interaction between fluid dynamics and rotordynamics...... University of Denmark and Lloyd's Register Consulting are currently establishing a purpose built state of the art multiphase seal test facility, which is divided into three modules. Module I consists of a full scale Active Magnetic Bearing (AMB) based rotor dynamic test bench. The internally designed custom...... AMBs are equipped with an embedded Hall sensor system enabling high precision non-contact seal force quantification. Module II is a fully automatised calibration facility for the Hall sensor based force quantification system. Module III consists of the test seal housing assembly. This paper provides...

  14. House Fly (Musca domestica L. Attraction to Insect Honeydew.

    Directory of Open Access Journals (Sweden)

    Kim Y Hung

    Full Text Available House flies are of major concern as vectors of food-borne pathogens to food crops. House flies are common pests on cattle feedlots and dairies, where they develop in and feed on animal waste. By contacting animal waste, house flies can acquire human pathogenic bacteria such as Escherichia coli and Salmonella spp., in addition to other bacteria, viruses, or parasites that may infect humans and animals. The subsequent dispersal of house flies from animal facilities to nearby agricultural fields containing food crops may lead to pre-harvest food contamination with these pathogens. We hypothesized that odors from honeydew, the sugary excreta produced by sucking insects feeding on crops, or molds and fungi growing on honeydew, may attract house flies, thereby increasing the risk of food crop contamination. House fly attraction to honeydew-contaminated plant material was evaluated using a laboratory bioassay. House flies were attracted to the following plant-pest-honeydew combinations: citrus mealybug on squash fruit, pea aphid on faba bean plants, whitefly on navel orange and grapefruit leaves, and combined citrus mealybug and cottony cushion scale on mandarin orange leaves. House flies were not attracted to field-collected samples of lerp psyllids on eucalyptus plants or aphids on crepe myrtle leaves. Fungi associated with field-collected honeydews were isolated and identified for further study as possible emitters of volatiles attractive to house flies. Two fungal species, Aureobasidium pullulans and Cladosporium cladosporioides, were repeatedly isolated from field-collected honeydew samples. Both fungal species were grown in potato dextrose enrichment broth and house fly attraction to volatiles from these fungal cultures was evaluated. House flies were attracted to odors from A. pullulans cultures but not to those of C. cladosporioides. Identification of specific honeydew odors that are attractive to house flies could be valuable for the

  15. House Fly (Musca domestica L.) Attraction to Insect Honeydew.

    Science.gov (United States)

    Hung, Kim Y; Michailides, Themis J; Millar, Jocelyn G; Wayadande, Astri; Gerry, Alec C

    2015-01-01

    House flies are of major concern as vectors of food-borne pathogens to food crops. House flies are common pests on cattle feedlots and dairies, where they develop in and feed on animal waste. By contacting animal waste, house flies can acquire human pathogenic bacteria such as Escherichia coli and Salmonella spp., in addition to other bacteria, viruses, or parasites that may infect humans and animals. The subsequent dispersal of house flies from animal facilities to nearby agricultural fields containing food crops may lead to pre-harvest food contamination with these pathogens. We hypothesized that odors from honeydew, the sugary excreta produced by sucking insects feeding on crops, or molds and fungi growing on honeydew, may attract house flies, thereby increasing the risk of food crop contamination. House fly attraction to honeydew-contaminated plant material was evaluated using a laboratory bioassay. House flies were attracted to the following plant-pest-honeydew combinations: citrus mealybug on squash fruit, pea aphid on faba bean plants, whitefly on navel orange and grapefruit leaves, and combined citrus mealybug and cottony cushion scale on mandarin orange leaves. House flies were not attracted to field-collected samples of lerp psyllids on eucalyptus plants or aphids on crepe myrtle leaves. Fungi associated with field-collected honeydews were isolated and identified for further study as possible emitters of volatiles attractive to house flies. Two fungal species, Aureobasidium pullulans and Cladosporium cladosporioides, were repeatedly isolated from field-collected honeydew samples. Both fungal species were grown in potato dextrose enrichment broth and house fly attraction to volatiles from these fungal cultures was evaluated. House flies were attracted to odors from A. pullulans cultures but not to those of C. cladosporioides. Identification of specific honeydew odors that are attractive to house flies could be valuable for the development of improved house

  16. House Fly (Musca domestica L.) Attraction to Insect Honeydew

    Science.gov (United States)

    Hung, Kim Y.; Michailides, Themis J.; Millar, Jocelyn G.; Wayadande, Astri; Gerry, Alec C.

    2015-01-01

    House flies are of major concern as vectors of food-borne pathogens to food crops. House flies are common pests on cattle feedlots and dairies, where they develop in and feed on animal waste. By contacting animal waste, house flies can acquire human pathogenic bacteria such as Escherichia coli and Salmonella spp., in addition to other bacteria, viruses, or parasites that may infect humans and animals. The subsequent dispersal of house flies from animal facilities to nearby agricultural fields containing food crops may lead to pre-harvest food contamination with these pathogens. We hypothesized that odors from honeydew, the sugary excreta produced by sucking insects feeding on crops, or molds and fungi growing on honeydew, may attract house flies, thereby increasing the risk of food crop contamination. House fly attraction to honeydew-contaminated plant material was evaluated using a laboratory bioassay. House flies were attracted to the following plant-pest-honeydew combinations: citrus mealybug on squash fruit, pea aphid on faba bean plants, whitefly on navel orange and grapefruit leaves, and combined citrus mealybug and cottony cushion scale on mandarin orange leaves. House flies were not attracted to field-collected samples of lerp psyllids on eucalyptus plants or aphids on crepe myrtle leaves. Fungi associated with field-collected honeydews were isolated and identified for further study as possible emitters of volatiles attractive to house flies. Two fungal species, Aureobasidium pullulans and Cladosporium cladosporioides, were repeatedly isolated from field-collected honeydew samples. Both fungal species were grown in potato dextrose enrichment broth and house fly attraction to volatiles from these fungal cultures was evaluated. House flies were attracted to odors from A. pullulans cultures but not to those of C. cladosporioides. Identification of specific honeydew odors that are attractive to house flies could be valuable for the development of improved house

  17. Attractiveness for Younger Generation of Ostrava - Jih Housing Area Developed in Socialist Era: Through Interviews with the Inhabitants (Ostrava-City, Czech Republic)

    Science.gov (United States)

    Tanaka, Yuno; Kanki, Kiyoko

    2017-10-01

    Ostrava city had developed as an industrial city in socialist era but now faces to deindustrialization. Ostrava-Jih is one of the housing areas developed in the socialist era. In this paper, the attractiveness of Ostrava-Jih for younger generation was showed by interview with inhabitants. As a result, the accessibility to nature around the housing estate, commercial facilities and public facilities, reasonable rent and housing price were evaluated. Besides, the inhabitants have done some activities for making their neighbourhoods more attractive.

  18. Concerning some problems of heavy equipment maintenance in the Maritsa-Iztok Combine

    Energy Technology Data Exchange (ETDEWEB)

    Khristov, B

    1979-09-01

    Discusses low quality of repairs on mining equipment which causes extensive periods of idleness. The central service base at Radnevo not only lacks capacity to do repairs on heavy excavating equipment but is also poorly equipped with mobile cranes and service trucks to keep up adequate maintenance activity at working sites. Limited supply of spare parts is partly due to decreasing imports and partly to the lack of production facilities at the central service base. Undue delays are also caused by a lack of access roads, for example, the Troyanovo 1 mine cannot be reached by road even during the summer season. There are constant fluctuations of technical personnel and the number of specialists remaining past their first contract period is decreasing. Integration of all maintenance and repair operations, establishment of advanced training facilities and more economic use of equipment is recommended. (In Bulgarian)

  19. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  20. Integral alpha and gamma radiation measurements in dwelling houses

    International Nuclear Information System (INIS)

    Paripas, B.; Takacs, S.; Somogyi, G.; Nikl, I.

    1984-01-01

    A solid state nuclear track detector method is applied to determine radon and total alpha-exposures (time integral of activity concentrations). The mathematical description of the method of measurement by a passive device equipped with two plastic sheets is presented. Measurements have been carried out in 88 houses over a five-month period and in 20 houses every season for a whole year. Simultaneously with the seasonal measurements of alpha-exposures, the gamma doses were also determined by means of TL dosemeters. The mean exposures due to thoron and its progeny have been estimated by statistical methods. A possible connection between the measured quantities and the lung cancer rates in two settlements were examined. (Author)

  1. 75 FR 4100 - Affirmative Fair Housing, Marketing (AFHM) Plan-Multifamily Housing, Affirmative Fair Housing...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-01] Affirmative Fair Housing, Marketing (AFHM) Plan-Multifamily Housing, Affirmative Fair Housing Marketing (AFHM) Plan-Single Family Housing and Affirmative Fair Housing Marketing (AFHM) Plan- Cooperatives/Condominiums AGENCY: Office of...

  2. Beyond the glitz of new equipment

    International Nuclear Information System (INIS)

    Stolberg, H.O.; Nahmias, C.

    2001-01-01

    Canadian radiologists were informed by the press on Mar. 17, 2001, about an important initiative of their national organization. The CAR had commissioned a Montreal law firm to provide a legal opinion about the use of 'obsolete equipment'. The lawyer of the law firm opined that 'it is imperative that the patient be advised and understand the risks and uncertainties associated with the reliability of such an examination'. The 5-page legal opinion (available at www.car.ca) also recommended that radiologists inform patients that they should consider shopping around for a hospital or clinic with newer machines, even if it means travelling out of the country. When summarizing the legal advice for the media, the Chief Executive Officer of the CAR said radiologists should advise patients if better equipment is available in other facilities, including 'private facilities', or in other jurisdictions, such as the United States. These developments should be of great concern to Canadian radiologists who are well aware of the problems associated with aging equipment and the lack of and limited access to newer imaging modalities. The legal initiative of the CAR, however, makes it imperative for individual radiologists to provide comments and for the CAR executive to answer a number of questions and address a number of priorities, including the following. (author)

  3. Radiation protection planning for decommissioning of research reactor facilities

    International Nuclear Information System (INIS)

    Jackson, Roger; Harman, Neil; Craig, David; Fecitt, Lorna; Lobach, Yuri; Gorlinskij, Juri; Kolyadin, Vyacheslav; Pavlenko, Vytali

    2008-01-01

    The MR reactor at the Russian Research Centre Kurchatov Institute (RRCKI), Moscow was a 50 MW multipurpose material testing and research reactor equipped with nine experimental loop facilities to test prototype fuel for various nuclear power reactors being developed. The reactor was shut down in 1993 and de-fuelled. The experimental loops are located in basement rooms around the reactor. The nature of the research into the characteristics of fuel design and coolant chemistry resulted in fission products and activation products in the test loop equipment. Decommissioning of the loops therefore presents a number of challenges. In addition the city of Moscow has expanded such that the RRC KI is now surrounded by housing which had to be taken into account in the radiological protection planning. This paper describes the techniques proposed to undertake the dismantling operations in order to minimise the radiation exposure to workers and members of the public. Estimates have been made of the worker doses which could be incurred during the dismantling process and the environmental impacts which could occur. These are demonstrated to be as low as reasonably achievable. The work was funded by the UK Department of Business Enterprise and Regulatory Reform (DBERR) (formerly the Department of Trade and Industry) under the Nuclear Safety Programme (NSP) set up to address nuclear safety issues in the Former Soviet Union. (author)

  4. The solar house of CRESESB: seven years of success

    Energy Technology Data Exchange (ETDEWEB)

    Galdino, Marco Antonio; Souza, Hamilton Moss de, E-mail: marcoag@cepel.br

    2005-07-01

    The solar house is located in the facilities of CEPEL - Centro de Pesquisas de Energia Eletrica (Electric Power Research Centre) at Fundao Island, Rio de Janeiro, Brazil. It is powered by a stand-alone PV system and is operated by CRESESB - Centro de Referencia para Energia Solar e Eolica Sergio de Salvo Brito (Reference Centre for Solar and Wind Energy Sergio de Salvo Brito) as a demonstration centre. The solar house was built in 1997, and during seven years of operation it received about 9.000 visitors (up to middle 2004). The present paper shares some aspects of the experience gained with the solar house, including technical details of the systems installed, the experience in operation and maintenance, and the divulgation and training of personnel so far obtained. (author)

  5. Phase 1 sampling and analysis plan for the 304 Concretion Facility closure activities

    International Nuclear Information System (INIS)

    Adler, J.G.

    1994-01-01

    This document provides guidance for the initial (Phase 1) sampling and analysis activities associated with the proposed Resource Conservation and Recovery Act of 1976 (RCRA) clean closure of the 304 Concretion Facility. Over its service life, the 304 Concretion Facility housed the pilot plants associated with cladding uranium cores, was used to store engineering equipment and product chemicals, was used to treat low-level radioactive mixed waste, recyclable scrap uranium generated during nuclear fuel fabrication, and uranium-titanium alloy chips, and was used for the repackaging of spent halogenated solvents from the nuclear fuels manufacturing process. The strategy for clean closure of the 304 Concretion Facility is to decontaminate, sample (Phase 1 sampling), and evaluate results. If the evaluation indicates that a limited area requires additional decontamination for clean closure, the limited area will be decontaminated, resampled (Phase 2 sampling), and the result evaluated. If the evaluation indicates that the constituents of concern are below action levels, the facility will be clean closed. Or, if the evaluation indicates that the constituents of concern are present above action levels, the condition of the facility will be evaluated and appropriate action taken. There are a total of 37 sampling locations comprising 12 concrete core, 1 concrete chip, 9 soil, 11 wipe, and 4 asphalt core sampling locations. Analysis for inorganics and volatile organics will be performed on the concrete core and soil samples. Separate concrete core samples will be required for the inorganic and volatile organic analysis (VOA). Analysis for inorganics only will be performed on the concrete chip, wipe, and asphalt samples

  6. 30 CFR 75.382 - Mechanical escape facilities.

    Science.gov (United States)

    2010-07-01

    ... with brakes that can stop the fully loaded platform, cage, or other device. (c) Mechanical escape facilities, including automatic elevators, shall be examined weekly. The weekly examination of this equipment... cages, platforms, or elevators. (e) Mechanical escape facilities shall have rated capacities consistent...

  7. Campania Region's Educational Quality Facilities Project

    Science.gov (United States)

    Ponti, Giorgio

    2009-01-01

    This article describes the Educational Quality Facilities project undertaken by Italy's Campania Region to provide quality facilities to all of its communities basing new spaces on the "Flexible Learning Module". The objectives of the five-year project are to: build and equip new educational spaces; improve the quality of existing…

  8. 24 CFR 232.620 - Determination of compliance by HHS.

    Science.gov (United States)

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Special Requirements § 232.620 Determination of compliance by HHS. An...

  9. Institutionalizing Safeguards By Design for Nuclear Facilities

    International Nuclear Information System (INIS)

    Morgan, James B.; Kovacic, Donald N.; Whitaker, J. Michael

    2008-01-01

    Safeguards for nuclear facilities can be significantly improved by developing and implementing methodologies for integrating proliferation resistance into the design of new facilities. This paper proposes a method to systematically analyze a facility's processes, systems, equipment, structures and management controls to ensure that all relevant proliferation scenarios that could potentially result in unacceptable consequences have been identified, evaluated and mitigated. This approach could be institutionalized into a country's regulatory structure similar to the way facilities are licensed to operate safely and are monitored through inspections and incident reporting to ensure compliance with domestic and international safeguards. Furthermore, taking credit for existing systems and equipment that have been analyzed and approved to assure a facility's reliable and safe operations will reduce the overall cost of implementing intrinsic and extrinsic proliferation-resistant features. The ultimate goal is to integrate safety, reliability, security and safeguards operations into the design of new facilities to effectively and efficiently prevent diversion, theft and misuse of nuclear material and sensitive technologies at both the facility and state level. To facilitate this approach at the facility level, this paper discusses an integrated proliferation resistance analysis (IPRA) process. If effectively implemented, this integrated approach will also facilitate the application of International Atomic Energy Agency (IAEA) safeguards

  10. Implementation of decommissioning criteria in the conceptual design of the MRS facility

    International Nuclear Information System (INIS)

    Gross, D.L.; Wilcox, A.D.; Huang, S.

    1986-01-01

    The US Department of Energy (DOE) selected the Ralph M. Parsons Company (RMP) to prepare the conceptual design of the Monitored Retrievable Storage (MRS) Facility. The purpose of this facility is to consolidate and temporarily store spent fuel from civilian nuclear power plants. In addition, it will overpack, handle, and store high-level radioactive waste from non-defense related sources. The Functional Design Criteria (FDC) prepared by Pacific Northwest Laboratories, as well as 10 CFR 72, requires the facility to be designed for decommissioning, with provisions to facilitate decontamination of structures and equipment to minimize the volume of radioactive wastes and contaminated equipment at the time of decommissioning. Many problems associated with decommissioning a nuclear facility have been identified in recent years and the design for the MRS Facility presents a unique opportunity for RMP to implement decommissioning criteria into the conceptual design of a major nuclear facility. The provisions made in the design to facilitate decommissioning include good housekeeping during operations, controlled personnel access, access for equipment removal, equipment design, installed radiation monitors, adequate work space, installed decontamination systems and areas, control of all effluents, and operational documentation. These topics will be the major points of discussion for this paper

  11. Design, Fabrication and Installation of the Charcoal Filter Housing in RIPF

    International Nuclear Information System (INIS)

    Kim, Min Jin; Lim, I. C.; Bang, H. S.

    2008-05-01

    In the Hot Cell Bank 3 of the Radioisotope Production Facility, production and dispense of I-131 solution and capsule that are used for the diagnosis and treatment of thyroid cancer are made. The original charcoal filter housings installed in 1994 and were utilized until the leakage of a very small amount of radio-iodine was found due to the erroneous installation of the charcoal filter in the filter housing. Thus the production of I-131 was discontinued until the repair and performance testing of the filter housing and the inspection by the regulatory body were finished. Although the production of I-131 was resumed, there was a desire for installing the brand-new charcoal filter housing which has an intrinsically safe design and no possibility of leakage. This report describes the design, fabrication and installation of brand-new charcoal filter housing. And also were described the dismantlement of the old housings, the assessment of the structural integrity of the shielding concrete wall and the installation of the shielding doors

  12. The design and qualification of radiation tolerant equipment for the nuclear power industry

    International Nuclear Information System (INIS)

    Sharp, R.; Pater, L.

    1995-01-01

    The nuclear power industry has many demands for equipment tolerant to the damaging effects of radiation. The wide variety of applications, including components handling, tooling, monitoring and communications, means that a systematic evaluation of the effects of radiation on materials and components used for equipment in radioactive facilities is often required. This paper describes the various effects of radiation on equipment, and discusses how to manage them when using and designing equipment. (Author)

  13. Race, ethnicity, and noxious facilities: Environmental racism re- examined

    Energy Technology Data Exchange (ETDEWEB)

    Nieves, A.L. [Wheaton Coll., IL (United States)]|[Argonne National Lab., IL (United States); Nieves, L.A. [Argonne National Lab., IL (United States)

    1992-10-01

    The charge has been made that hazardous facilities tend to be located in proximity to minority populations. This study uses a facility density measure for three categories of noxious facilities to examine the relationship between facilities and minority population concentrations. County-level data are used in a correlation analysis for African Americans, Hispanics, and Asians in the four major regions of the US. Even controlling for income and housing value, and limiting the data set to urban areas, consistent patterns of moderate to strong association of facility densities with minority population percentages are found.

  14. Advanced Test Reactor National Scientific User Facility Partnerships

    International Nuclear Information System (INIS)

    Marshall, Frances M.; Allen, Todd R.; Benson, Jeff B.; Cole, James I.; Thelen, Mary Catherine

    2012-01-01

    In 2007, the United States Department of Energy designated the Advanced Test Reactor (ATR), located at Idaho National Laboratory, as a National Scientific User Facility (NSUF). This designation made test space within the ATR and post-irradiation examination (PIE) equipment at INL available for use by researchers via a proposal and peer review process. The goal of the ATR NSUF is to provide researchers with the best ideas access to the most advanced test capability, regardless of the proposer's physical location. Since 2007, the ATR NSUF has expanded its available reactor test space, and obtained access to additional PIE equipment. Recognizing that INL may not have all the desired PIE equipment, or that some equipment may become oversubscribed, the ATR NSUF established a Partnership Program. This program enables and facilitates user access to several university and national laboratories. So far, seven universities and one national laboratory have been added to the ATR NSUF with capability that includes reactor-testing space, PIE equipment, and ion beam irradiation facilities. With the addition of these universities, irradiation can occur in multiple reactors and post-irradiation exams can be performed at multiple universities. In each case, the choice of facilities is based on the user's technical needs. Universities and laboratories included in the ATR NSUF partnership program are as follows: (1) Nuclear Services Laboratories at North Carolina State University; (2) PULSTAR Reactor Facility at North Carolina State University; (3) Michigan Ion Beam Laboratory (1.7 MV Tandetron accelerator) at the University of Michigan; (4) Irradiated Materials at the University of Michigan; (5) Harry Reid Center Radiochemistry Laboratories at University of Nevada, Las Vegas; (6) Characterization Laboratory for Irradiated Materials at the University of Wisconsin-Madison; (7) Tandem Accelerator Ion Beam. (1.7 MV terminal voltage tandem ion accelerator) at the University of Wisconsin

  15. Dry Well Storage Facility conceptual design study

    International Nuclear Information System (INIS)

    1979-02-01

    The Dry Well Storage Facility described is assumed to be located adjacent to or near a Spent Fuel Receiving and Packaging Facility and/or a Packaged Fuel Transfer Facility. Performance requirements, quality levels and codes and standards, schedule and methods of performance, special requirements, quality assurance program, and cost estimate are discussed. Appendices on major mechanical equipment and electric power requirements are included

  16. Dry Well Storage Facility conceptual design study

    Energy Technology Data Exchange (ETDEWEB)

    1979-02-01

    The Dry Well Storage Facility described is assumed to be located adjacent to or near a Spent Fuel Receiving and Packaging Facility and/or a Packaged Fuel Transfer Facility. Performance requirements, quality levels and codes and standards, schedule and methods of performance, special requirements, quality assurance program, and cost estimate are discussed. Appendices on major mechanical equipment and electric power requirements are included.

  17. Fast Flux Test Facility (FFTF) maintenance provisions

    International Nuclear Information System (INIS)

    Marshall, J.L.

    1981-05-01

    The Fast Flux Test Facility (FFTF) was designed with maintainability as a primary parameter, and facilities and provisions were designed into the plant to accommodate the maintenance function. This paper describes the FFTF and its systems. Special maintenance equipment and facilities for performing maintenance on radioactive components are discussed. Maintenance provisions designed into the plant to enhance maintainability are also described

  18. Autonomous houses. Autonomous house

    Energy Technology Data Exchange (ETDEWEB)

    Tanaka, S. (Tokai University, Tokyo (Japan). Faculty of Engineering)

    1991-09-30

    Self-sufficiency type houses are outlined. On condition that people gain a certain amount of income in relation with the society, they self-suffice under the given environment, allowing themselves to accept a minimum of industrial products with small environmental load. Ordinary supply from outside of fossil energy and materials which depend on it is minimized. Types are classified into three: energy, energy materials and perfect self-sufficiency. A study project for environment symbiotic houses is progressing which is planned by the Ministry of Construction and Institute of Building Energy Conservation and is invested by a private company. Its target is making a house for halving an environmental load by CO{sub 2}, for the purpose of creating the environment symbiotic house which is nice to and in harmony with the global environment and human beings. As a part of the studies on energy-saving and resource conservation on houses, introduced is a plan of an autonomous house at Izu-Atagawa. The passive method and high thermal-insulation are used for air conditioning, and hot spring water for hot water supply. Electric power is generated by hydroelectric power generation using mountain streams and by solar cells. Staple food is purchased, while subsidiary food is sufficed. 17 refs., 4 figs., 1 tab.

  19. An audit of some health facilities and equipment for neonatal ...

    African Journals Online (AJOL)

    Background: Neonatal Mortality rates continue to be high in spite of the general decline in under-5 mortality rates in Nigeria. Available evidence has shown that the availability of a skilled birth attendant and equipment for basic neonatal resuscitation is necessary for the prevention of early neonatal death which accounts for ...

  20. 305 Building Cold Test Facility Management Plan

    International Nuclear Information System (INIS)

    Whitehurst, R.

    1994-01-01

    This document provides direction for the conduct of business in Building 305 for cold testing tools and equipment. The Cold Test Facility represents a small portion of the overall building, and as such, the work instructions already implemented in the 305 Building will be utilized. Specific to the Cold Test there are three phases for the tools and equipment as follows: 1. Development and feature tests of sludge/fuel characterization equipment, fuel containerization equipment, and sludge containerization equipment to be used in K-Basin. 2. Functional and acceptance tests of all like equipment to be installed and operated in K-Basin. 3. Training and qualification of K-Basin Operators on equipment to be installed and operated in the Basin

  1. Evolution of design concepts for remotely maintainable equipment racks

    International Nuclear Information System (INIS)

    Peishel, F.L.; Mouring, R.W.; Schrock, S.L.

    1986-01-01

    Equipment racks have been used to support process equipment in radioactive facilities for many years. Improvements in the design of these racks have evolved relatively slowly primarily as a result of limitations in the capabilities of maintenance equipment; that is, tasks could only be approached from above using bridge cranes with viewing primarily through periscopes. In recent years, however, technological advances have been made by the Consolidated Fuel Reprocessing Program (CFRP) at Oak Ridge National Laboratory (ORNL) in bridge-mounted servomanipulators with onboard auxiliary hoists and television viewing systems. These advances permit full cell coverage by the manipulator arms which, in turn, allow maintenance tasks to be approached horizontally as well as from above. Maintainable equipment items can be stacked vertically on a rack because total overhead access is less important and maintenance tasks that would not have been attempted in the past can now be performed. These advances permit greater flexibility in the design and cell layout of the racks and lead to concepts that could significantly increase the availability of a facility. The evolution of rack design and a description of the alternative concepts based on present maintenance systems capabilities are presented in this paper. 13 refs., 11 figs

  2. National Ignition Facility Control and Information System Operational Tools

    International Nuclear Information System (INIS)

    Marshall, C.D.; Beeler, R.G.; Bowers, G.A.; Carey, R.W.; Fisher, J.M.; Foxworthy, C.B.; Frazier, T.M.; Mathisen, D.G.; Lagin, L.J.; Rhodes, J.J.; Shaw, M.J.

    2009-01-01

    The National Ignition Facility (NIF) in Livermore, California, is the world's highest-energy laser fusion system and one of the premier large scale scientific projects in the United States. The system is designed to setup and fire a laser shot to a fusion ignition or high energy density target at rates up to a shot every 4 hours. NIF has 192 laser beams delivering up to 1.8 MJ of energy to a ∼2 mm target that is planned to produce >100 billion atm of pressure and temperatures of >100 million degrees centigrade. NIF is housed in a ten-story building footprint the size of three football fields as shown in Fig. 1. Commissioning was recently completed and NIF will be formally dedicated at Lawrence Livermore National Laboratory on May 29, 2009. The control system has 60,000 hardware controls points and employs 2 million lines of control system code. The control room has highly automated equipment setup prior to firing laser system shots. This automation has a data driven implementation that is conducive to dynamic modification and optimization depending on the shot goals defined by the end user experimenters. NIF has extensive facility machine history and infrastructure maintenance workflow tools both under development and deployed. An extensive operational tools suite has been developed to support facility operations including experimental shot setup, machine readiness, machine health and safety, and machine history. The following paragraphs discuss the current state and future upgrades to these four categories of operational tools.

  3. Structural design of nuclear reactor machinery and equipment

    International Nuclear Information System (INIS)

    Hara, Hideki

    1992-01-01

    Since the machinery, equipment and piping which compose nuclear power station facilities are diverse, when those are designed, consideration is given sufficiently to the objective of use and the importance of the object machinery and equipment so that those can maintain the soundness over the design life. In this report, on the contents and the design standard in the design techniques for nuclear reactor machinery and equipment, the way of thinking is shown, taking an example of reactor pressure vessel which is stipulated as the vessel kind 1 in the 'Technical standard of structures and others regarding nuclear facilities for electric power generation', Notice No. 501 of the Ministry of International Trade and Industry. The reactor pressure vessel of 1350 MWe improved type BWR (ABWR) is used under the condition of 87.9 kg/cm 2 and 302 degC, and the inside diameter is about 7.2 m, the inside height is about 21 m, and the wall thickness is about 170 mm. The design standard for reactor pressure vessels and its way of thinking, breakdown prevention design and the design techniques for reactor pressure vessels are described. (K.I.)

  4. Preliminary design of a production automation framework for a pyroprocessing facility

    Directory of Open Access Journals (Sweden)

    Moonsoo Shin

    2018-04-01

    Full Text Available Pyroprocessing technology has been regarded as a promising solution for recycling spent fuel in nuclear power plants. The Korea Atomic Energy Research Institute has been studying the current status of equipment and facilities for pyroprocessing and found that existing facilities are manually operated; therefore, their applications have been limited to laboratory scale because of low productivity and safety concerns. To extend the pyroprocessing technology to a commercial scale, the facility, including all the processing equipment and the material-handling devices, should be enhanced in view of automation. In an automated pyroprocessing facility, a supervised control system is needed to handle and manage material flow and associated operations. This article provides a preliminary design of the supervising system for pyroprocessing. In particular, a manufacturing execution system intended for an automated pyroprocessing facility, named Pyroprocessing Execution System, is proposed, by which the overall production process is automated via systematic collaboration with a planning system and a control system. Moreover, a simulation-based prototype system is presented to illustrate the operability of the proposed Pyroprocessing Execution System, and a simulation study to demonstrate the interoperability of the material-handling equipment with processing equipment is also provided. Keywords: Manufacturing Execution System, Material-handling, Production Automation, Production Planning and Control, Pyroprocessing, Pyroprocessing Execution System

  5. Conceptual design for the Waste Receiving and Processing facility Module 2A

    International Nuclear Information System (INIS)

    1992-07-01

    This is part of a Conceptual Design Report (CDR) for the Waste Receiving and Processing (WRAP) Module 2A facility at the Hanford Reservation. The mission of the facility is to receive, process, package, certify, and ship for permanent burial at the Hanford site disposal facilities those contact handled (CH) low-level radioactive mixed wastes (LLMW) that: (1) are currently in retrievable storage at the Hanford Central Waste Complex (HCWC) awaiting a treatment capability to permit permanent disposal compliant with the Land Disposal Restrictions and; (2) are forecasted to be generated over the next 30 years. The primary sources of waste to be treated include the currently stored waste from the 183-H solar basin evaporators, secondary solids from the future Hanford site liquid effluent treatment facilities, thermal treatment facility ash, other WRAP modules, and other miscellaneous waste from storage and onsite/offsite waste generators consisting of compactible and non-compactible solids, contaminated soils, and metals. This volume, Volume III is a compilation of the outline specifications that will form the basis for development of the Title design construction specifications. This volume contains abbreviated CSI outline specifications for equipment as well as non-equipment related construction and material items. For process and mechanical equipment, data sheets are provided with the specifications which indicate the equipment overall design parameters. This volume also includes a major equipment list

  6. Military Real Property Maintenance: Management Improvements are needed to Ensure Adequate Facilities

    National Research Council Canada - National Science Library

    Chan, Kwai-Cheung

    2000-01-01

    ... about $5 billion for each of the past 4 years (fiscal years 1996-1999). Separate accounts are used to fund maintenance and repair of family housing, many industrial-related facilities, and many military medical facilities...

  7. Overview of power plant and industrial facility performance in earthquakes in 1985 through 1987

    International Nuclear Information System (INIS)

    Horstman, N.G.; Yanev, P.I.; McCormick, D.L.

    1987-01-01

    This paper briefly documents the performance of power and industrial facilities during five destructive earthquakes in 1985 and 1986. These earthquakes represent varying levels of intensity, duration, frequency content, epicentral distance and construction practice. All of the earthquakes reinforce the findings of earlier earthquake investigations. Damage to equipment in power and industrial facilities is rare, as long as the equipment is adequately anchored. The ceramic components of switchyard equipment and the actuation of electro-mechanical relays remain concerns in the design of facilities which must remain operational during and following strong motion earthquakes. (orig.)

  8. Innova House - Ottawa`s advanced house

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-31

    A pilot program was developed to provide the housing industry with a means to field test innovative technologies, products and building systems, and to evaluate their overall performance. Under Canada`s Advanced House Program, ten demonstration houses were designed, built and monitored. Ottawa`s Innova House, was one of the ten houses built for this program. The innovative energy saving features of the house included (1) air distribution with small diameter ducts and an electronically commutated motor, a 2.6 kW grid-connected photovoltaic system, (3) an energy recovery ventilator (ERV) with free-cooling mode, (4) a 94 per cent efficient integrated gas heating and hot water system, (5) airtight drywall construction, (6) CFC-free exterior insulation, (7) a natural-gas-engine heat pump for air conditioning, (8) a prototype sealed combustion gas range and clothes dryer, and (9) a manifold plumbing system to conserve water. It was designed to consume one half of the energy consumed in an R-2000 home and one third of the energy of a conventional house. Several of the mechanical elements did not perform at expected levels, (lower than expected efficiencies from the heating and cooling systems and a malfunctioning ERV), nevertheless, overall performance of the house was still very close to the targets. The construction and operation of the house was described. tabs., figs.

  9. 24 CFR 232.510 - Commitment and commitment fee.

    Science.gov (United States)

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Fees and Charges § 232.510 Commitment and commitment fee. (a) Issuance of...

  10. 24 CFR 232.520 - Maximum fees and charges by lender.

    Science.gov (United States)

    2010-04-01

    ... HOUSING AND URBAN DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND... of Fire Safety Equipment Fees and Charges § 232.520 Maximum fees and charges by lender. The lender...

  11. Housing for the elderly in Denmark, life conditions today and future scenarios

    DEFF Research Database (Denmark)

    Welling, Helen

    2004-01-01

    in the population profile will increase the need for housing and facilities for the elderly. At the same time the number of working taxprayers will be relatively less. The life conditions of the elderly have changed through time. The elderly in Denmark are not any longer belonging to the weakest social population......Living and housing conditions for the elderly have become one of society's major problems - socially, culturally and economically. Today there are approximately one million people in Denmark at the age over 60 years. Too many of the older citizens live in out-of-date housing. The changes occurring...... group. The first part of this paper focus on an outline of 20th Century major trends with special reference to building for the elderly. The second part describes new developments in elderly housing and the third part introduces to studies of future housing needs for the elderly. Paper presented...

  12. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  13. University multi-user facility survey-2010.

    Science.gov (United States)

    Riley, Melissa B

    2011-12-01

    Multi-user facilities serve as a resource for many universities. In 2010, a survey was conducted investigating possible changes and successful characteristics of multi-user facilities, as well as identifying problems in facilities. Over 300 surveys were e-mailed to persons identified from university websites as being involved with multi-user facilities. Complete responses were received from 36 facilities with an average of 20 years of operation. Facilities were associated with specific departments (22%), colleges (22%), and university research centers (8.3%) or were not affiliated with any department or college within the university (47%). The five most important factors to succeed as a multi-user facility were: 1) maintaining an experienced, professional staff in an open atmosphere; 2) university-level support providing partial funding; 3) broad client base; 4) instrument training programs; and 5) an effective leader and engaged strategic advisory group. The most significant problems were: 1) inadequate university financial support and commitment; 2) problems recovering full service costs from university subsidies and user fees; 3) availability of funds to repair and upgrade equipment; 4) inability to retain highly qualified staff; and 5) unqualified users dirtying/damaging equipment. Further information related to these issues and to fee structure was solicited. Overall, there appeared to be a decline in university support for facilities and more emphasis on securing income by serving clients outside of the institution and by obtaining grants from entities outside of the university.

  14. Furnace and support equipment for space processing. [space manufacturing - Czochralski method

    Science.gov (United States)

    Mazelsky, R.; Duncan, C. S.; Seidensticker, R. G.; Johnson, R. A.; Hopkins, R. H.; Roland, G. W.

    1975-01-01

    A core facility capable of performing a majority of materials processing experiments is discussed. Experiment classes are described, the needs peculiar to each experiment type are outlined, and projected facility requirements to perform the experiments are treated. Control equipment (automatic control) and variations of the Czochralski method for use in space are discussed.

  15. Feasibility study on equipment of LLW management business system

    International Nuclear Information System (INIS)

    Shimizu, Takafumi

    2010-01-01

    LLW from university and private company has been kept in their own nuclear facilities in Japan. RANDEC has been studying business system for the treatment and conditioning of LLW before disposal. Reference to proven waste treatment process used in Nuclear Power Plant, it was studied that the appropriate treatment process for the LLW from university and private company. The waste will be collected from the university and private company to a central treatment facility. After operations such as unpacking, classification, compression, incineration and others, the waste will be treated to waste form. Most equipment are adopted by the process technology used in Nuclear Power Plant. But some equipment such as measurement of radio activity and solidification of powder need to be studied for the treatment of LLW from university and private company. (author)

  16. Regulatory Activities on Civil Nuclear Safety Equipment in China

    International Nuclear Information System (INIS)

    Gaoshang, Lu; Choi, Kwang Sik

    2011-01-01

    It is stipulated in IAEA Fundamental Safety Principles (SF1) that the fundamental safety objective is to protect people and the environment from harmful effects of ionizing radiation. The fundamental safety objective applies for all facilities and activities and for all stages over the lifetime of a facility or radiation source, including planning, sitting, design, manufacturing, construction, commissioning and operation, as well as decommissioning and closure. So, according to the requirement, the related activities such as design, manufacturing, installation and non-destructive test that conducted on civil nuclear equipment should be well controlled by the vendors, the owner of the nuclear power plants and the regulatory body. To insure the quality of those equipment, Chinese government had taken a series of measures to regulate the related activities on them

  17. Fiscal 1976 Sunshine Project result report. R and D on solar cooling/heating and hot water supply system (R and D on the system for apartment houses); 1976 nendo taiyo reidanbo oyobi kyuto system no kenkyu kaihatsu seika hokokusho. Shugo jutakuyo system no kenkyu kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1977-03-01

    This report describes the fiscal 1976 research result on solar cooling/heating and hot water supply system for apartment houses. In the system research, comparative study was made on facility costs and operation costs per heat load between previous and solar cooling/heating and hot water supply systems for apartment houses. In the working design for apartment houses, various calculation necessary for start of work, and preparation of detail drawings and specifications were made. In development of solar collector, the test loop and collector were prepared using full-scale collector elements for medium-scale performance tests. In development of heat accumulator, inorganic hydrate was selected as heat storage material using latent heat for the confirmation test of basic physical properties. In development of solar cooling/heating equipment, the confirmation test of Rankine engine's performance, controllability and durability was made under real load. In addition, the refrigerator of nearly 20 tons of refrigeration driven by Rankine engine was fabricated, (NEDO)

  18. Rethinking Space Design Standards Toward Quality Affordable Housing In Malaysia

    Directory of Open Access Journals (Sweden)

    Ishak Nor Haniza

    2016-01-01

    Full Text Available Provision of affordable housing is important to low- and middle-income population. A fit form of house will not only fulfil a basic human need for shelter, but it also contributes to physical and psychological well-being of the occupants. Excellent quality and affordable housing is an indication of a high quality of life. While writings exist on various aspects of the quality of affordable housing in Malaysia, discussion regarding space and design standards has scarcely been given any serious academic attention. Standards concerning residential development usually cover different aspects or stages of the development process. They can include planning standards, design standards, space standards and technical construction standards. The main concern of this paper is on space and design standards specifically. Space standard can be defined as a set of framework which dictates fixed internal space minimums. Meanwhile, design standard indicates design guidelines to ensure the functionality, comfortability and habitability of the house. This paper is concerned exclusively with indoor spaces of a house excluding external circulation spaces and service facilities (in case of strata housing. Its interest is in internal space as an aspect of housing quality. It can be concluded that one of the way forward will be to find the balance between providing adequate minimum spaces for resident satisfactions and having economic values for housing developers. This paper may be used as a valuable reference for authorities and policy makers to better address the best housing space design standards that would benefit not only the occupants, but also the local government and developers alike.

  19. Environmental Assessment for the Independent Waste Handling Facility, 211-F at the Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-08-01

    Currently, liquid Low Activity Waste (LAW) and liquid High Activity Waste (HAW) are generated from various process operational facilities/processes throughout the Savannah River Site (SRS) as depicted on Figure 2-1. Prior to storage in the F-Area tank farm, these wastes are neutralized and concentrated to minimize their volume. The Waste Handling Facility (211-3F) at Building 211-F Complex (see Figure 2-2) is the only existing facility onsite equipped to receive acidic HAW for neutralization and volume reduction processing. Currently, Building 221-F Canyon (see Figure 2-2) houses the neutralization and evaporation facilities for HAW volume reduction and provides support services such as electric power and plant, process, and instrument air, waste transfer capabilities, etc., for 21 1-F operations. The future plan is to deactivate the 221-F building. DOE`s purpose is to be able to process the LAW/HAW that will continue to be generated on site. DOE needs to establish an alternative liquid waste receipt and treatment capability to support site facilities with a continuing mission. The desire is for Building 211-F to provide the receipt and neutralization functions for LAW and HAW independent of 221-F Canyon. The neutralization capability is required to be part of the Nuclear Materials Stabilization Programs (NMSP) facilities since the liquid waste generated by the various site facilities is acidic. Tn order for Waste Management to receive the waste streams, the solutions must be neutralized to meet Waste Management`s acceptance criteria. The Waste Management system is caustic in nature to prevent corrosion and the subsequent potential failure of tanks and associated piping and hardware.

  20. Zero carbon home: Britain’s house of the future (?

    Directory of Open Access Journals (Sweden)

    Fell Antony

    2016-01-01

    Full Text Available One of the key issues that determine the wellbeing of young people in Britain is their prospect of living and raising a family in a house of their own. In an ideal scenario, a young professional couple should be able to purchase a comfortable and affordable home as they need it, but in the recent years, the affordability of new homes for young people has become a problem as house prices rose. Moreover, the British government is committed to reducing Britain’s carbon emissions [1] , and for future home owners this means that new houses must meet strict criteria ensuring that they are equipped with energy saving features that make them eco friendly. Britian’s ideal ecohouse of the future is a very high energy efficiency rating home, a zero carbon home. However, these requirements increase the building cost of new homes, which in turn can raise the house prices even further. This article surveys new energy saving solutions which are being implemented in British homes and evaluates their effectiveness and cost. Using desk top research as the method for this enquiry the authors attempt to sketch the image of the (possible house of the future – a type of dwelling that new home buyers should be buying in years to come – if they can afford it.

  1. How to improve housing conditions of laboratory animals: The possibilities of environmental refinement

    NARCIS (Netherlands)

    Baumans, V.; Loo, P.L.P. van

    2013-01-01

    Housing systems for captive animals have often been designed on the basis of economic and ergonomic considerations, such as equipment, costs, space, workload, ability to observe the animals and to maintain a certain degree of hygiene, with little or no consideration for animal welfare. Environmental

  2. Risk assessment of LPG automotive refuelling facilities

    Energy Technology Data Exchange (ETDEWEB)

    Melchers, R.E. [University of Newcastle, Newcastle (Australia). Dept. of Civil, Surveying and Enviromental Engineering; Feutrill, W.R. [Wesfarmers Kleenheat Gas Pty. Ltd., Perth (Australia)

    2001-12-01

    Quantified risk analysis (QRA) was used for the revision of regulatory separation distances associated with medium size liquefied petroleum gas (LPG) refuelling facilities used in automotive service (gas) stations. Typically these facilities consist of a 7.5 kl pressure vessel, pump, pipework, dispensing equipment and safety equipment. Multi-tank installations are relatively uncommon. This paper describes the hazard scenarios considered, the risk analysis procedure and the selection and application of data for initiating events and for rates of failure of mechanical components and of the pressure vessel. Human errors and intervention possibilities were also considered. Because of the inapplicability of established consequence models and the relatively small scale of the facilities, a number of tests were performed to estimate flame length, flame impingement effects, ignition probabilities and the effectiveness of screening devices. (author)

  3. Demonstration of remotely operated TRU waste size reduction and material handling equipment

    International Nuclear Information System (INIS)

    Looper, M.G.; Charlesworth, D.L.

    1988-01-01

    The Savannah River Laboratory (SRL) is developing remote size reduction and material handling equipment to prepare 238 Pu contaminated waste for permanent disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. The waste is generated at the Savannah River Plant (SRP) from normal operation and decommissioning activity and is retrievably stored onsite. A Transuranic Waste Facility for preparing, size-reducing, and packaging this waste for disposal is scheduled for completion in 1995. A cold test facility for demonstrating the size reduction and material handling equipment was built, and testing began in January 1987. 9 figs., 1 tab

  4. Intelligent Processing Equipment Developments Within the Navy's Manufacturing Technology Centers of Excellence

    Science.gov (United States)

    Nanzetta, Philip

    1992-01-01

    The U.S. Navy has had an active Manufacturing Technology (MANTECH) Program aimed at developing advanced production processes and equipment since the late-1960's. During the past decade, however, the resources of the MANTECH program were concentrated in Centers of Excellence. Today, the Navy sponsors four manufacturing technology Centers of Excellence: the Automated Manufacturing Research Facility (AMRF); the Electronics Manufacturing Productivity Facility (EMPF); the National Center for Excellence in Metalworking Technology (NCEMT); and the Center of Excellence for Composites Manufacturing Technology (CECMT). This paper briefly describes each of the centers and summarizes typical Intelligent Equipment Processing (IEP) projects that were undertaken.

  5. Analytical methods and laboratory facility for the Defense Waste Processing Facility

    International Nuclear Information System (INIS)

    Coleman, C.J.; Dewberry, R.A.; Lethco, A.J.; Denard, C.D.

    1985-01-01

    This paper describes the analytical methods, instruments, and laboratory that will support vitrification of defense waste. The Defense Waste Processing Facility (DWPF) is now being constructed at Savannah River Plant (SRP). Beginning in 1989, SRP high-level defense waste will be immobilized in borosilicate glass for disposal in a federal repository. The DWPF will contain an analytical laboratory for performing process control analyses. Additional analyses will be performed for process history and process diagnostics. The DWPF analytical facility will consist of a large shielded sampling cell, three shielded analytical cells, a laboratory for instrumental analysis and chemical separations, and a counting room. Special instrumentation is being designed for use in the analytical cells, including microwave drying/dissolution apparatus, and remote pipetting devices. The instrumentation laboratory will contain inductively coupled plasma, atomic absorption, Moessbauer spectrometers, a carbon analyzer, and ion chromatography equipment. Counting equipment will include intrinsic germanium detectors, scintillation counters, Phoswich alpha, beta, gamma detectors, and a low-energy photon detector

  6. Remote maintenance lessons learned on prototypical reprocessing equipment

    International Nuclear Information System (INIS)

    Kring, C.T.; Schrock, S.L.

    1990-01-01

    A major objective of the Consolidated Fuel Reprocessing Program at the Oak Ridge National Laboratory is to develop and demonstrate the technology required to reprocess spent nuclear fuel. The Fuel Recycle Division, over the past 16 years, has undertaken this objective by designing and testing prototypical hardware representing essentially every major equipment item currently included in most fuel reprocessing plant conceptual designs. These designs are based on total remote maintenance to increase plant availability and reduce radiation exposure to plant operators. The designs include modular equipment to facilitate maintainability and the remote manipulation necessary to accomplish maintenance tasks. Prototypic equipment has been installed and tested in a cold mock-up of a reprocessing hot cell, called the remote operations and maintenance demonstration facility. The applied maintenance concept utilizes the dexterity and mobility of bridge-mounted, force-reflecting servomanipulators. Prototypic processing equipment includes a remote disassembly system, a remote shear system, a rotary dissolver, a remote automated sampler system, removable equipment racks to support chemical process equipment items, and the advanced servomanipulators. Each of these systems and a brief description of functions are discussed

  7. Using Whole-House Field Tests to Empirically Derive Moisture Buffering Model Inputs

    Energy Technology Data Exchange (ETDEWEB)

    Woods, J.; Winkler, J.; Christensen, D.; Hancock, E.

    2014-08-01

    Building energy simulations can be used to predict a building's interior conditions, along with the energy use associated with keeping these conditions comfortable. These models simulate the loads on the building (e.g., internal gains, envelope heat transfer), determine the operation of the space conditioning equipment, and then calculate the building's temperature and humidity throughout the year. The indoor temperature and humidity are affected not only by the loads and the space conditioning equipment, but also by the capacitance of the building materials, which buffer changes in temperature and humidity. This research developed an empirical method to extract whole-house model inputs for use with a more accurate moisture capacitance model (the effective moisture penetration depth model). The experimental approach was to subject the materials in the house to a square-wave relative humidity profile, measure all of the moisture transfer terms (e.g., infiltration, air conditioner condensate) and calculate the only unmeasured term: the moisture absorption into the materials. After validating the method with laboratory measurements, we performed the tests in a field house. A least-squares fit of an analytical solution to the measured moisture absorption curves was used to determine the three independent model parameters representing the moisture buffering potential of this house and its furnishings. Follow on tests with realistic latent and sensible loads showed good agreement with the derived parameters, especially compared to the commonly-used effective capacitance approach. These results show that the EMPD model, once the inputs are known, is an accurate moisture buffering model.

  8. Remote handling equipment for SNS

    International Nuclear Information System (INIS)

    Poulten, B.H.

    1983-01-01

    This report gives information on the areas of the SNS, facility which become highly radioactive preventing hands-on maintenance. Levels of activity are sufficiently high in the Target Station Area of the SNS, especially under fault conditions, to warrant reactor technology to be used in the design of the water, drainage and ventilation systems. These problems, together with the type of remote handling equipment required in the SNS, are discussed

  9. 24 CFR 232.500 - Definitions.

    Science.gov (United States)

    2010-04-01

    ... Commissioner in consideration of the contract of insurance. (c)(1) Fire safety equipment means equipment that... DEVELOPMENT MORTGAGE AND LOAN INSURANCE PROGRAMS UNDER NATIONAL HOUSING ACT AND OTHER AUTHORITIES MORTGAGE INSURANCE FOR NURSING HOMES, INTERMEDIATE CARE FACILITIES, BOARD AND CARE HOMES, AND ASSISTED LIVING...

  10. Preliminary conceptual study of engineering-scale pyroprocess demonstration facility

    International Nuclear Information System (INIS)

    Moon, Seong-In; Chong, Won-Myung; You, Gil-Sung; Ku, Jeong-Hoe; Kim, Ho-Dong

    2013-01-01

    Highlights: ► The conceptual design of a pyroprocess demonstration facility was performed. ► The design requirements for the pyroprocess hot cell and equipment were determined. ► The maintenance concept for the pyroprocess hot cell was presented. -- Abstract: The development of an effective management technology of spent fuel is important to enhance environmental friendliness, cost viability and proliferation resistance. In Korea, pyroprocess technology has been considered as a fuel cycle option to solve the spent fuel accumulation problems. PRIDE (PyRoprocess Integrated inactive DEmonstration facility) has been developed from 2007 to 2012 in Korea as a cold test facility to support integrated pyroprocessing and an equipment demonstration, which is essential to verify the pyroprocess technology. As the next stage of PRIDE, the design requirements of an engineering-scale demonstration facility are being developed, and the preliminary conceptual design of the facility is being performed for the future. In this paper, the main design requirements for the engineering-scale pyroprocess demonstration facility were studied in the throughput of 10tHM a year. For the preliminary conceptual design of the facility, the design basis of the pyroprocess hot cell was suggested, and the main equipment, main process area, operation area, maintenance area, and so on were arranged in consideration of the effective operation of the hot cells. Also, the argon system was designed to provide and maintain a proper inert environment for the pyroprocess. The preliminary conceptual design data will be used to review the validity of the engineering-scale pyroprocess demonstration facility that enhances both safety and nonproliferation

  11. Alpha-Gamma Hot-Cell Facility at Argonne National Laboratory East

    International Nuclear Information System (INIS)

    Neimark, L.A.; Jackson, W.D.; Donahue, D.A.

    1979-01-01

    The Alpha-Gamma Hot-Cell Facility has been in operation at Argonne National Laboratory East (ANL-E) for 15 years. The facility was designed for plutonium research in support of ANL's LMFBR program. The facility consists of a kilocurie, nitrogen-atmosphere alpha-gamma hot cell and supporting laboratories. Modifications to the facility and its equipment have been made over the years as the workload and nature of the work changed. These modifications included inerting the entire hot cell, adding four work stations, modifying in-loading procedures and examination equipment to handle longer test articles, and changing to a new sodium-vapor lighting system. Future upgrading includes the addition of a decontamination and repair facility, use of radio-controlled transfer carts, refurbishment of the zinc bromide windows, and the installation of an Auger microprobe

  12. Operating procedures: Fusion Experiments Analysis Facility

    Energy Technology Data Exchange (ETDEWEB)

    Lerche, R.A.; Carey, R.W.

    1984-03-20

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility.

  13. Operating procedures: Fusion Experiments Analysis Facility

    International Nuclear Information System (INIS)

    Lerche, R.A.; Carey, R.W.

    1984-01-01

    The Fusion Experiments Analysis Facility (FEAF) is a computer facility based on a DEC VAX 11/780 computer. It became operational in late 1982. At that time two manuals were written to aid users and staff in their interactions with the facility. This manual is designed as a reference to assist the FEAF staff in carrying out their responsibilities. It is meant to supplement equipment and software manuals supplied by the vendors. Also this manual provides the FEAF staff with a set of consistent, written guidelines for the daily operation of the facility

  14. Domestic manufacturing and reliability improvement of reactor water recirculation equipment

    International Nuclear Information System (INIS)

    Kobayashi, Hidekazu; Oi, Masao; Shida, Toichi; Yokomori, Takashi

    1982-01-01

    The reactor coolant recirculation system is one of the important systems to control the reactor output in BWR nuclear power plants. Its components require high reliability and maintainability as well as controllability. For many Japanese nuclear power plants, recirculation pumps, fluid couplings and others have been imported so far. Hitachi Ltd. has established a domestic manufacturing organization through the development and test of these equipment. The fundamental design conditions for these equipment are the improvement of the rate of utilization of plant facility, the capability to follow load, and output power stability. In this paper, the specifications, the investigation of moment of inertia and the design features of recirculation pumps, driving motors and variable frequency power supply systems are described. The paper also reports on the combination test implemented to evaluate the recirculation system. The combination test includes the test using water rheostat for the power source facility and the loading test for a recirculation pump. The application of those system equipment to an actual plant was analyzed and evaluated on a basis of the test data obtained. The result showed that the equipment can achieve the rate of change of reactor power of 30%/min. Those equipment have been employed for No. 2 reactor plant of the Fukushima No. 2 Nuclear Power Station, the Tokyo Electric Power Co., Inc. (Wakatsuki, Y.)

  15. Initial acceptance test experience with FFTF plant equipment

    International Nuclear Information System (INIS)

    Brown, R.K.; Coleman, K.A.; Mahaffey, M.K.; McCargar, C.G.; Young, M.W.

    1978-09-01

    The purpose of this paper is to examine the initial acceptance test experience of certain pieces of auxiliary equipment of the Fast Flux Test Facility (FFTF). The scope focuses on the DHX blowers and drive train, inert gas blowers, H and V containment isolation valves, and the Surveillance and In-service Inspection (SISI) transporter and trolley. For each type of equipment, the discussion includes a summary of the design and system function, installation history, preoperational acceptance testing procedures and results, and unusual events and resolutions

  16. White House science council ponders measures to improve energy funding

    CERN Multimedia

    Jones, D

    2003-01-01

    "The business strategy of the Energy Department's Office of Science is largely based on its 20-year plan for constructing or upgrading 28 facilities, most of them at department laboratories, DOE science chief Raymond Orbach told members of a White House advisory panel last week" (1 page).

  17. Ministry of ordinance determining the technical standard concerning atomic energy facilities for power generation

    International Nuclear Information System (INIS)

    1985-01-01

    The ministerial ordinance provides for the technical standards for the power generation of nuclear facilities; i.e., electric power facilities generating electricity with nuclear energy for motive power, according to the Electricity Enterprises Act. The contents are as follows: protection against fires, aseismatic design, radiation protective barriers, structural protection for sitings, reactor installation, safety measures, materials and structures, safety valves, pressure resistance tests, reactor core, radiation shields, reactor cooling, emergency core cooling system, facility equipment, alarm system, reactor control system, reactor control room, fuel storage facility, fuel handling facility, ventilation equipment, radioactive contamination prevention, radioactive waste management facility, reactor containment facility, and so on. (Kubozono, M.)

  18. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  19. Multidisciplinary approach to evaluating welfare of veal calves in commercial facilities.

    Science.gov (United States)

    Stull, C L; McDonough, S P

    1994-09-01

    Due to pending legislation and public concerns, a multidisciplinary approach was designed to investigate the welfare of special-fed veal calves in commercial veal facilities. Concerns included housing conditions, dietary regimens, management practices, and behavioral aspects imposed on special-fed calves. Four categories of parameters including environment and housing, nutrition, health and stress, and behavior provided a broad base of evaluating veal systems. Observations and samples were collected on 550 Holstein bull calves located in 10 commercial veal facilities. Each facility was visited to collect data during wk 0 (week of arrival of the calves), 2, 4, 8, 12, and 16. Nine facilities used individual stalls 48 to 55 cm in width with tethers attached to the front of the stalls. One facility housed 30 calves in group pens after obtaining calves at 8 wk of age. Ammonia, carbon monoxide, and hydrogen sulfide gas did not exceed the permissible limit for humans in any facility. All facilities exceeded the 2-foot-candle recommendation for lighting. The average daily gain of calves was .85 kg during wk 0 to 8 and 1.18 kg during wk 8 to 16. Dietary iron levels decreased from 209 ppm at wk 0 to 32 ppm at wk 16. At 16 wk, 25% of calves were marginally anemic and 10% clinically anemic. Overall mortality was 4.2%. Stress indices such as plasma cortisol concentrations or neutrophil to lymphocyte ratios declined as calves approached market weight. In either pens or stalls, calves spent approximately 25 and 75% of time in standing and lying positions, respectively.(ABSTRACT TRUNCATED AT 250 WORDS)

  20. Housing markets and housing policies in India

    OpenAIRE

    Tiwari, Piyush; Rao, Jyoti

    2016-01-01

    Issues of housing in India are synonymous with ignorance of housing in active government involvement at the policy and program formulation levels. They are also due to the problems that unplanned urbanization, income disparity, poverty, illiteracy, and unemployment brought. These issues extenuated the housing problem, causing a housing shortage of 51 million in 2011. Though India has a long history of establishing policies, programs, and institutions to cater to housing, without allocating ad...

  1. RPC industries - UV and EB equipment manufacturers

    International Nuclear Information System (INIS)

    Rodrigues, A.M.

    1987-01-01

    RPC Industries has been manufacturing electron beam and ultraviolet equipment for the industrial processing of materials for more than 15 years. RPC maintains its headquarters and electron processor manufacturing plant in Hayward, California. UV equipment is made in the company's plant near Chicago. Sales offices are maintained in New York, Illinois, and California in the USA, and in Germany, Japan, Australia, Italy, Israel, and Sweden. Complete testing and pilot facilities are available in Hayward (EB) and near Chicago (UV). Described below are the basic system components, applications and advantages of RPC's UV and EB systems. (orig.)

  2. Conceptual design report, CEBAF basic experimental equipment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-04-13

    The Continuous Electron Beam Accelerator Facility (CEBAF) will be dedicated to basic research in Nuclear Physics using electrons and photons as projectiles. The accelerator configuration allows three nearly continuous beams to be delivered simultaneously in three experimental halls, which will be equipped with complementary sets of instruments: Hall A--two high resolution magnetic spectrometers; Hall B--a large acceptance magnetic spectrometer; Hall C--a high-momentum, moderate resolution, magnetic spectrometer and a variety of more dedicated instruments. This report contains a short description of the initial complement of experimental equipment to be installed in each of the three halls.

  3. Fiscal 1997 survey report. Survey consigned to NEDO of the development of energy use rationalization home welfare equipment systems; 1997 nendo energy shiyo gorika zaitaku fukushi kiki system kaihatsu chosa. Itaku kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-03-01

    For the purpose of constructing new home welfare equipment systems of an energy effective use type, an investigational analysis was conducted of characteristics of the structure of houses considered of aged people, characteristics of the use of home welfare equipment, etc. As to the subject on space warming/cooling, it was found that the hour of stay-at-home of the aged tends to be longer, and the hour to be required for warming/cooling is longer, that the aged gradually lose senses regarding the peripheral environmental temperature, and the temperature to be considered should be at warmer/cooler levels, and that they are weak in heat shock, and the space of house where the temperature is uneven should be removed. Further, from the study in each welfare techno-house, possibilities were pointed out of further energy conservation in houses considered of the aged and home welfare equipment systems like the weight reduction of home welfare equipment systems and reduction of stand-by power, high air-tightness/high thermal insulation of houses for the aged, use of waste heat from air conditioners, introduction of solar energy to stand-by power and electrically-driven wheel chairs. 257 figs., 89 tabs.

  4. Development of process diagnostic techniques for piping and equipment

    International Nuclear Information System (INIS)

    Yotsutsuji, Mitoshi

    1987-01-01

    The thing required for using the facilities composing a plant for a long period without anxiety is to quantitatively grasp the quantities of the present condition of the facilities and to take the necessary measures beforehand. For this purpose, the diagnostic techniques for quickly and accurately detect the quantities of the condition of facilities are necessary, and the development of process diagnostic techniques has been desired. The process diagnostic techniques mentioned here mean those for diagnosing the contamination, clogging and performance of towers, tanks, heat exchangers and others. Idemitsu Engineering Co. had developed a simplified diagnostic equipment for detecting the state of fouling in piping in 1982, which is the gamma ray transmission diagnosis named Scale Checker. By further improving it, the process diagnostic techniques for piping and equipment were developed. In this report, the course of development and examination, the principle of detection, the constitution and the examination of remodeling of the Scale Checker are reported. As the cases of process diagnosis in plant facilities, the diagnosis of the clogging in process piping and the diagnosis of the performance of a distillation tower were carried out. The contents of the diagnosis and the results of those cases are explained. (Kako, I.)

  5. Alpha-contained laboratory scale pulse column facility for SRL

    International Nuclear Information System (INIS)

    Reif, D.J.; Cadieux, J.R.; Fauth, D.J.; Thompson, M.C.

    1980-01-01

    For studying solvent extraction processes, a laboratory-sized pulse column facility was constructed at the Savannah River Laboratory. This facility, in conjunction with existing miniature mixer-settler equipment and the centrifugal contactor facility currently under construction at SRL, provides capability for cross comparison of solvent extraction technology. This presentation describes the design and applications of the Pulse Column Facility at SRL

  6. Inclusive Development through Providing Vertical Housing for Low Income Family in Yogyakarta Urban Areas

    Directory of Open Access Journals (Sweden)

    Rini Rachmawati

    2017-12-01

    Full Text Available Inclusive development is mean to accommodate the marginalized people, most of whom are the poor with problem of fulfilling their need of housing. The government has tried hard to meet the need of housing by constructing rusunawa. This paper is aimed at describing about the provision and uses of rusunawa, both in cities and peri urban area by studying the cases in the City of Yogyakarta, Sleman Regency, and Bantul Regency. The study was conducted by doing observation and both structured and in-depth interviews. The research results show that rusunawa was viewed as one solutions to help low-income family in fulfilling their need of housing. In some cases in the City of Yogyakarta, rusunawa plays an important role in preventing the settlement along both sides of rivers from becoming slum areas. Rusunawa in both Regencies of Sleman and Bantul are located near the city so it is easy for the settlers to get to their workplace. The construction of rusunawa has also paid attention to the disabled by providing special facilities. The same case is providing playground for children and facilities for early education for young kids. However, there have not been special facilities for the elderly and pregnant women.

  7. Radiation safety in X-ray facilities

    International Nuclear Information System (INIS)

    2001-09-01

    The guide specifies the radiation safety requirements for structural shielding and other safety arrangements used in X-ray facilities in medical and veterinary X-ray activities and in industry, research and education. The guide is also applicable to premises in which X-ray equipment intended for radiation therapy and operating at a voltage of less than 25 kV is used. The guide applies to new X-ray facilities in which X-ray equipment that has been used elsewhere is transferred. The radiation safety requirements for radiation therapy X-ray devices operating at a voltage exceeding 25 kV, and for the premices in which such devices are used, are set out in Guide ST 2.2

  8. Radiation safety in X-ray facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-09-01

    The guide specifies the radiation safety requirements for structural shielding and other safety arrangements used in X-ray facilities in medical and veterinary X-ray activities and in industry, research and education. The guide is also applicable to premises in which X-ray equipment intended for radiation therapy and operating at a voltage of less than 25 kV is used. The guide applies to new X-ray facilities in which X-ray equipment that has been used elsewhere is transferred. The radiation safety requirements for radiation therapy X-ray devices operating at a voltage exceeding 25 kV, and for the premices in which such devices are used, are set out in Guide ST 2.2.

  9. 24 CFR 982.608 - Congregate housing: Voucher housing assistance payment.

    Science.gov (United States)

    2010-04-01

    ... Housing Types Congregate Housing § 982.608 Congregate housing: Voucher housing assistance payment. (a... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Congregate housing: Voucher housing assistance payment. 982.608 Section 982.608 Housing and Urban Development Regulations Relating to Housing and...

  10. Improved control rod drive handling equipment for BWRs [boiling-water reactors]: Final report

    International Nuclear Information System (INIS)

    Turner, A.P.L.; Gorman, J.A.

    1987-08-01

    Improved equipment for removing and replacing control rod drives (CRDs) in BWR plants has been designed, built and tested. Control rod drives must be removed from the reactor periodically for servicing. Removal and replacement of CRDs using equipment originally supplied with the plant has long been recognized as one of the more difficult and highest radiation exposure maintenance operations that must be performed at BWR plants. The improved equipment was used for the first time at Quad Cities, Unit 2, during a Fall 1986 outage. The trial of the equipment was highly successful, and it was shown that the new equipment significantly improves CRD handling operations. The new equipment significantly simplifies the sequence of operations required to lower a CRD from its housing, upend it to a horizontal orientation, and transport it out of the reactor containment. All operations of the new equipment are performed from the undervessel equipment handling platform, thus, eliminating the requirement for a person to work on the lower level of the undervessel gallery which is often highly contaminated. Typically, one less person is required to operate the equipment than were used with the older equipment. The new equipment incorporates a number of redundant and fail safe features that improve operations and reduce the chances for accidents

  11. Development of radiation safety monitoring system at gamma greenhouse gamma facility

    International Nuclear Information System (INIS)

    Hairul Nizam Idris; Azimawati Ahmad, Ahmad Zaki Hussain; Ahmad Fairuz Mohd Nasir

    2009-01-01

    This paper is discussing about installation of radiation safety monitoring system at Gamma Greenhouse Gamma facility, Agrotechnology and Bioscience Division (BAB). This facility actually is an outdoor type irradiation facility, which first in Nuclear Malaysia and the only one in Malaysia. Source Cs-137 (801 Curie) was use as radiation source and it located at the centre of 30 metres diameter size of open irradiation area. The radiation measurement and monitoring system to be equipped in this facility were required the proper equipment and devices, specially purpose for application at outside of building. Research review, literature study and discussion with the equipment manufacturers was being carried out, in effort to identify the best system should be developed. Factors such as tropical climate, environment surrounding and security were considered during selecting the proper system. Since this facility involving with panoramic radiation type, several critical and strategic locations have been fixed with radiation detectors, up to the distance at 200 meter from the radiation source. Apart from that, this developed system also was built for capable to provide the online real-time reading (using internet). In general, it can be summarized that the radiation safety monitoring system for outdoor type irradiation facility was found much different and complex compared to the system for indoor type facility. Keyword: radiation monitoring, radiation safety, Gamma Greenhouse, outdoor irradiation facility, panoramic radiation. (Author)

  12. Quality control of diagnostic x-ray equipment and film processing

    International Nuclear Information System (INIS)

    1993-01-01

    According to the section 40 of the Radiation Act (592/92), the licensee is required in Finland to make the arrangements to control the function of the radiation equipment and related facilities used for medical procedures. The guide explains how quality control can be organized for diagnostic x-ray equipment. It also gives recommendations for constancy tests for conventional x-ray radiographic and fluoroscopic equipment and for film processing. The recommendations are based on the publications and statements of the International Committee for Radiation Protection (ICRP) and standardization organizations. The intention is that the operators of x-ray equipment or the maintenance personnel are able to perform the quality control tests presented in the guide

  13. Deep Space Network equipment performance, reliability, and operations management information system

    Science.gov (United States)

    Cooper, T.; Lin, J.; Chatillon, M.

    2002-01-01

    The Deep Space Mission System (DSMS) Operations Program Office and the DeepSpace Network (DSN) facilities utilize the Discrepancy Reporting Management System (DRMS) to collect, process, communicate and manage data discrepancies, equipment resets, physical equipment status, and to maintain an internal Station Log. A collaborative effort development between JPL and the Canberra Deep Space Communication Complex delivered a system to support DSN Operations.

  14. Thermal design of a modern, two floor, zero energy house in a desert compound

    KAUST Repository

    Serag-Eldin, M. A.

    2010-01-01

    The paper presents a thermal analysis and design of a fully equipped, air-conditioned, zero energy house located in a desert compound at 24.5° latitude. Unlike previous designs the home is two floors high, which makes the balancing of energy supply

  15. Realities of proximity facility siting

    International Nuclear Information System (INIS)

    DeMott, D.L.

    1981-01-01

    Numerous commercial nuclear power plant sites have 2 to 3 reactors located together, and a group of Facilities with capabilities for fuel fabrication, a nuclear reactor, a storage area for spent fuel, and a maintenance area for contaminated equipment and radioactive waste storage are being designed and constructed in the US. The proximity of these facilities to each other provides that the ordinary flow of materials remain within a limited area. Interactions between the various facilities include shared resources such as communication, fire protection, security, medical services, transportation, water, electrical, personnel, emergency planning, transport of hazardous material between facilities, and common safety and radiological requirements between facilities. This paper will explore the advantages and disadvantages of multiple facilities at one site. Problem areas are identified, and recommendations for planning and coordination are discussed

  16. Third party testing : new pilot facility for mining processes opens in Fort McKay

    International Nuclear Information System (INIS)

    Jaremko, D.

    2007-01-01

    Fort McKay lies 65 kilometres north of Fort McMurray, Alberta and is the centre of operational oilsands mining activity. As such, it was chosen for a pilot testing facility created by the Geneva-based SGS Group. The reputable facility provides an opportunity for mining producers to advance their processes, including environmental performance, by allowing them to test different processes on their own oilsands. The Northern Lights partnership, led by Synenco Energy, was the first client at the facility. Due to outsourcing, clients are not obligated to make substantial capital investment into in-house research. The Northern Lights partnership will be using the facility to test extraction processes on bitumen from its leases. Although the Fort McKay facility is SGS's first venture into the oilsands industry, it operates in more than 140 companies globally, including the mineral industry, and specializes in inspection, verification, testing and certification. SGS took the experience from its minerals extraction business to identify what could be done to help the oilsands industry by using best practices developed from global operations. The facility lies on the Fort McKay industrial park owned by the Fort McKay First Nation. An existing testing facility called McMurray Resources Research and Testing was expanded by the SGS Group to include environmental analysis capabilities. The modular units that lie on 6 acres include refrigerated ore storage to maintain ore integrity; modular ore and materials handling systems; extraction equipment; and, zero discharge process water and waste disposal systems. Froth treatment will be added in the near future to cover the entire upstream side of the mining processing business. A micro-upgrader might be added in the future to manufacture synthetic crude. 3 figs

  17. Third party testing : new pilot facility for mining processes opens in Fort McKay

    Energy Technology Data Exchange (ETDEWEB)

    Jaremko, D.

    2007-12-15

    Fort McKay lies 65 kilometres north of Fort McMurray, Alberta and is the centre of operational oilsands mining activity. As such, it was chosen for a pilot testing facility created by the Geneva-based SGS Group. The reputable facility provides an opportunity for mining producers to advance their processes, including environmental performance, by allowing them to test different processes on their own oilsands. The Northern Lights partnership, led by Synenco Energy, was the first client at the facility. Due to outsourcing, clients are not obligated to make substantial capital investment into in-house research. The Northern Lights partnership will be using the facility to test extraction processes on bitumen from its leases. Although the Fort McKay facility is SGS's first venture into the oilsands industry, it operates in more than 140 companies globally, including the mineral industry, and specializes in inspection, verification, testing and certification. SGS took the experience from its minerals extraction business to identify what could be done to help the oilsands industry by using best practices developed from global operations. The facility lies on the Fort McKay industrial park owned by the Fort McKay First Nation. An existing testing facility called McMurray Resources Research and Testing was expanded by the SGS Group to include environmental analysis capabilities. The modular units that lie on 6 acres include refrigerated ore storage to maintain ore integrity; modular ore and materials handling systems; extraction equipment; and, zero discharge process water and waste disposal systems. Froth treatment will be added in the near future to cover the entire upstream side of the mining processing business. A micro-upgrader might be added in the future to manufacture synthetic crude. 3 figs.

  18. Preventive maintenance prioritization index of medical equipment using quality function deployment.

    Science.gov (United States)

    Saleh, Neven; Sharawi, Amr A; Elwahed, Manal Abd; Petti, Alberto; Puppato, Daniele; Balestra, Gabriella

    2015-05-01

    Preventive maintenance is a core function of clinical engineering, and it is essential to guarantee the correct functioning of the equipment. The management and control of maintenance activities are equally important to perform maintenance. As the variety of medical equipment increases, accordingly the size of maintenance activities increases, the need for better management and control become essential. This paper aims to develop a new model for preventive maintenance priority of medical equipment using quality function deployment as a new concept in maintenance of medical equipment. We developed a three-domain framework model consisting of requirement, function, and concept. The requirement domain is the house of quality matrix. The second domain is the design matrix. Finally, the concept domain generates a prioritization index for preventive maintenance considering the weights of critical criteria. According to the final scores of those criteria, the prioritization action of medical equipment is carried out. Our model proposes five levels of priority for preventive maintenance. The model was tested on 200 pieces of medical equipment belonging to 17 different departments of two hospitals in Piedmont province, Italy. The dataset includes 70 different types of equipment. The results show a high correlation between risk-based criteria and the prioritization list.

  19. Aespoe Hard Rock Laboratory. Ground magnetic survey at site for planned facility for calibration of borehole orientation equipment at Aespoe

    Energy Technology Data Exchange (ETDEWEB)

    Mattsson, Haakan (GeoVista AB (Sweden))

    2012-01-15

    This report presents survey description and results of ground magnetic measurements carried out by GeoVista AB at Aespoe in December, 2011. The purpose of the ground magnetic measurement was to measure variations in the earth magnetic field and to gain knowledge of the magnetization of the bedrock in an area where SKB plan to build a facility for calibration of equipment for measurements of borehole orientation. A total of 312 data points were collected along three survey lines, 104 points/profile. The data show nice and smooth variations that appear to be natural. There is a clear consistency of the magnetic field variations between the three survey lines, which indicates that the variations in the magnetic field reflect geological variations related to lithology and content of magnetic minerals. There are no indications of artifacts or erroneous data. The anomaly field averages at -32 nT with peak values of Min = -1,016 nT and Max = +572 nT. The strongest anomalies occur at profile length c. 130-140 m. Adding the background field of 50,823 nT, measured at a base station located close to the survey area, the total magnetic field averages at 50,791+-226 nT. The ground magnetic measurement gives background information before the construction of the calibration facility. The magnetic anomaly at c. 130-140 m give possibilities to control disturbances of magnetic-accelerometer based instruments. The magnetic measurements show that it is possible to construct the facility at the site

  20. Aespoe Hard Rock Laboratory. Ground magnetic survey at site for planned facility for calibration of borehole orientation equipment at Aespoe

    International Nuclear Information System (INIS)

    Mattsson, Haakan

    2012-01-01

    This report presents survey description and results of ground magnetic measurements carried out by GeoVista AB at Aespoe in December, 2011. The purpose of the ground magnetic measurement was to measure variations in the earth magnetic field and to gain knowledge of the magnetization of the bedrock in an area where SKB plan to build a facility for calibration of equipment for measurements of borehole orientation. A total of 312 data points were collected along three survey lines, 104 points/profile. The data show nice and smooth variations that appear to be natural. There is a clear consistency of the magnetic field variations between the three survey lines, which indicates that the variations in the magnetic field reflect geological variations related to lithology and content of magnetic minerals. There are no indications of artifacts or erroneous data. The anomaly field averages at -32 nT with peak values of Min = -1,016 nT and Max = +572 nT. The strongest anomalies occur at profile length c. 130-140 m. Adding the background field of 50,823 nT, measured at a base station located close to the survey area, the total magnetic field averages at 50,791±226 nT. The ground magnetic measurement gives background information before the construction of the calibration facility. The magnetic anomaly at c. 130-140 m give possibilities to control disturbances of magnetic-accelerometer based instruments. The magnetic measurements show that it is possible to construct the facility at the site

  1. Excavating and loading equipment for peat mining

    Science.gov (United States)

    Mikhailov, A. V.; Zhigulskaya, A. I.; Yakonovskaya, T. B.

    2017-10-01

    Recently, the issues of sustainable development of Russian regions, related to ensuring energy security, are more urgent than ever. To achieve sustainable development, an integrated approach to the use of local natural resources is needed. Practically in all north regions of the Russian Federation, peat as a local natural resource is widespread, which has a practical application in the area of housing services. The paper presents the evaluation of technologies for open-pit peat mining, as well as analysis of technological equipment for peat production. Special attention is paid to a question of peat materials excavating and loading. The problem of equipment selection in a peat surface mine is complex. Many features, restrictions and criteria need to be considered. Use of low and ultra-low ground pressure excavators and low ground pressure front-end loaders with full-range tires to provide the necessary floatation in the peat bog environment is offered.

  2. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  3. Readiness of health facilities to deliver safe male circumcision services in Tanzania: a descriptive study

    Directory of Open Access Journals (Sweden)

    Frank Felix Mosha

    2013-03-01

    Full Text Available Assessing the readiness of health facilities to deliver safe male circumcision services is more important in sub-Saharan Africa because of the inadequacy state of health facilities in many ways. The World Health Organization recommends that only facilities equipped with available trained staff, capable to perform at least minor surgery, able to offer minimum MC package and appropriate equipment for resuscitation, and compliant with requirements for sterilization and infection control should be allowed to deliver safe circumcision services. A cross-sectional study using quantitative data collection technique was conducted to assess the readiness of the health facilities to deliver safe circumcision services in selected districts of Tanzania. All hospitals, health centres and 30% of all dispensaries in these districts were selected to participate in the study. Face-toface questionnaires were administered to the heads of the health facilities and to health practitioners. Overall, 49/69 (59% of the facilities visited provided circumcision services and only 46/203 (24% of the health practitioners performed circumcision procedures. These were mainly assistant medical officers and clinical officers. The vast majority – 190/203 (95% – of the health practitioners require additional training prior to providing circumcision services. Most facilities – 63/69 (91% – had all basic supplies (gloves, basin, chlorine and waste disposal necessary for infection prevention, 44/69 (65% provided condoms, HIV counselling and testing, and sexuallytransmitted infections services, while 62/69 (90% had the capability to perform at least minor surgery. However, only 25/69 (36% and 15/69 (22% of the facilities had functioning sterilization equipment and appropriate resuscitation equipment, respectively. There is readiness for roll out of circumcision services; however, more practitioners need to be trained on circumcision procedures, demand forecasting

  4. Your house shouldn't kill you : why knowledge of building science is important

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    2006-05-15

    A carbon monoxide (CO) poisoning death in British Columbia in 1999 was used as a case study to examine errors and faults in Canadian construction practices. The main source of CO was from an over-fired propane boiler that spilled combustion products when the house's chimney failed to establish a proper draft. The heating system was a high-efficiency condensing propane forced air furnace. Basement in-slab radiant heating floor panels were heated by a B-vented draft hood equipped boiler. Although properly installed, one of the compounding effects allowing the CO to enter the living space was the cold B-vent serving the boiler, which reversed itself and became an additional air inlet. Depressurization in the furnace room was enhanced by the leaky furnace ducts and by the stack action in the house. The house was located at 2760 feet above sea level, and it was noted that many gas-fired appliances must be derated when used at 2000 feet in elevation. Additionally, some appliances must be derated from their natural gas ratings when units are fired by propane. It was also noted that the owner of the house returned after a prolonged absence, and turned the thermostat up to 30 degrees C, which meant that the heating system was firing much longer than if it had been set to 22 degrees C. After the post-mortem, the coroner's report recommended that return air leakage should be minimized; there should never be a cold chimney located largely outside the heated envelope of the house; a garage should not be heated with a home's forced air system as compensating make-up air is needed; and, make-up should be provided when there is a naturally vented combustion appliance in the house. It was also recommended that all new houses be equipped with a CO detector. 3 figs.

  5. Air ventilation/controlling facility

    Energy Technology Data Exchange (ETDEWEB)

    Yoshikawa, Kazuhiro; Kinoshita, Shoichiro

    1997-12-12

    When all electricity supply from the outside of a power plant are lost, a power generator directly connected to an emergency steam turbine which is driven by steams introduced from a nuclear reactor is driven to supply electricity required in the power plant. Cool water prepared by a refrigerator is used as cooling water in an air ventilation/controlling facility of a room equipped with the power generating facility. As the refrigerator, a refrigerator of an existent emergency air cooling water system for an auxiliary air ventilation/controlling equipment is used. This can extend the period of time till the temperature of the room where the power generator is disposed exceeds the temperature range capable of keeping the integrity of the power generator even when all the AC power supply are lost to inactivate the function of the air ventilation/controlling system. (I.S.)

  6. Aerial infrared monitoring for nuclear fuel cycle facilities in Ukraine

    International Nuclear Information System (INIS)

    Stankevich, S.A.; Dudar, T.V.; Kovalenko, G.D.; Kartashov, V.V.

    2015-01-01

    The scientific research overall objective is rapid express detection and preliminary identification of pre-accidental conditions at nuclear fuel cycle facilities. We consider development of a miniature unmanned aerial vehicle equipped with high-precision infrared spectroradiometer able to detect remotely internal warming up of hazardous facilities by its thermal infrared radiation. The possibility of remote monitoring using unmanned aerial vehicle is considered at the example of the dry spent fuel storage facility of the Zaporizhzhya Nuclear Power Plant. Infrared remote monitoring is supposed to present additional information on the monitored facilities based on different physical principles rather than those currently in use. Models and specifications towards up-to-date samples of infrared surveying equipment and its small-sized unmanned vehicles are presented in the paper.

  7. AERIAL DELIVERY DESIGN AND FABRICATION FACILITY

    Data.gov (United States)

    Federal Laboratory Consortium — Skilled personnel are equipped to design and develop various prototype airdrop items. This facility has all classes of sewing machines, ranging from lightweight to...

  8. Argonne to open new facility for advanced vehicle testing

    CERN Multimedia

    2002-01-01

    Argonne National Laboratory will open it's Advanced Powertrain Research Facility on Friday, Nov. 15. The facility is North America's only public testing facility for engines, fuel cells, electric drives and energy storage. State-of-the-art performance and emissions measurement equipment is available to support model development and technology validation (1 page).

  9. Housing and Health: The relationship between housing conditions ...

    African Journals Online (AJOL)

    okanlawon

    2011-10-22

    Oct 22, 2011 ... Housing and Health: The relationship between housing ... The authors in chapter one, deal extensively with historical context of housing and health chronologically ... Housing and Health: Time Again for Public Health Action.

  10. Naval Research Laboratory Major Facilities 2008

    Science.gov (United States)

    2008-10-01

    consists of two equipment shelters, a chiller for cooling the transmitter, and a 175 kVA diesel generator for use at remote sites. A 40-ft-long... bioremediation , and biodeterioration. INSTRUMENTATION: • ESEM equipped with an energy-dispersive X-ray detector and an image acquisition and...a 125 kW uninterruptible power system with diesel backup. Magnetic sensitivity testing of precision Precision Clock Evaluation Facility CONTACT

  11. Design, fabrication and installation of irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Sim, Bong Shick; Kim, Y. S.; Lee, C. Y. and others

    1999-03-01

    The principal contents of this project are to design, fabricate and install the steady-state fuel test loop in HANARO for nuclear technology development. Procurement and fabrication of main equipment, licensing and technical review for fuel test loop have been performed during 2 years(1997, 1998) for this project. Following contents are described in the report. - Procurement and fabrication of the equipment, piping for OPS - IPS manufacture - License - Technical review and evaluation of the FTL facility. As besides, as these irradiation facilities will be installed in HANARO, review of safety concern, discussion with KINS for licensing and review ofHANARO interface have been performed respectively. (author)

  12. Decommissioning of Phosphoric Acid Purification Facility, PT Petrokimia Gresik

    International Nuclear Information System (INIS)

    Zainus Salimin; Nanang TS; Zaid, Ach.; Chotimah; Karyono

    2008-01-01

    Decommissioning of phosporic acid purification facility was the administrative and technical actions taken to allow the removal of some or all of the regulatory control from that facility exploit the phosphoric acid containing uranium. The site location of facility was cleaned up as the clean previous site (green land) for another site project utilization. Decommissioning activities covers the draining of solution or solid powder of remaining process on the equipment, decontamination of site location and equipment wall, dismantling of equipment, decontamination of equipment after dismantling, and decontamination of concrete floor and wall. Uranium contaminated liquid waste and organic solution was treated by bio-oxidation process using bacteria. Remaining solid powder from process (28 drums), contaminated material and equipment after decontamination (60 drums of fire brick, 31 pieces of equipment cut, 2 drums of ashes, 10 drums of active sludge from bio-oxidation process) and concrete splinter of 10 drums of 200 l volume per drum are the radioactive waste that must be sent to Radioactive Waste Technology Centre for its treatment. The non contaminated material and equipment (908 ton) can be reused for reprocessing, some of non contaminated sludge (14.4 m 3 ) and all of non contaminated filtrate water (353 m 3 ) from bio-oxidation process with toxic matters qualification which comply to the its limit values are released on the effluent release drain system of the plant. Clearance level utilizing for filtering contaminated material or equipment was an activity concentration of 1 Bq/g, surface contamination of 1 Bq/cm 2 , effective dose on the 50 cm distance from surface of contaminated material of 0.5 μSv/h (BAPETEN Regulation Letter No. 1459A/P101/PIBN/2008). Limit values for toxic matter are pH 6-9, COD 100 ppm and BOD 50 ppm (Gov. Regulation of East Java No. 45 year of 2002). (author)

  13. TA-60-1 Heavy Equipment Shop Areas SWPPP Rev 2 Jan 2017-Final

    Energy Technology Data Exchange (ETDEWEB)

    Burgin, Jillian Elizabeth [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-02-07

    The primary activities and equipment areas at the facility that are potential stormwater pollution sources include; The storage of vehicles and heavy equipment awaiting repair; or repaired vehicles waiting to be picked up; The storage and handling of oils, anti-freeze, solvents, degreasers, batteries and other chemicals for the maintenance of vehicles and heavy equipment; and Equipment cleaning operations including exterior vehicle wash-down. Steam cleaning is only done on the steam cleaning pad area located at the north east end of Building 60-0001.

  14. A High-Throughput Biological Calorimetry Core: Steps to Startup, Run, and Maintain a Multiuser Facility.

    Science.gov (United States)

    Yennawar, Neela H; Fecko, Julia A; Showalter, Scott A; Bevilacqua, Philip C

    2016-01-01

    Many labs have conventional calorimeters where denaturation and binding experiments are setup and run one at a time. While these systems are highly informative to biopolymer folding and ligand interaction, they require considerable manual intervention for cleaning and setup. As such, the throughput for such setups is limited typically to a few runs a day. With a large number of experimental parameters to explore including different buffers, macromolecule concentrations, temperatures, ligands, mutants, controls, replicates, and instrument tests, the need for high-throughput automated calorimeters is on the rise. Lower sample volume requirements and reduced user intervention time compared to the manual instruments have improved turnover of calorimetry experiments in a high-throughput format where 25 or more runs can be conducted per day. The cost and efforts to maintain high-throughput equipment typically demands that these instruments be housed in a multiuser core facility. We describe here the steps taken to successfully start and run an automated biological calorimetry facility at Pennsylvania State University. Scientists from various departments at Penn State including Chemistry, Biochemistry and Molecular Biology, Bioengineering, Biology, Food Science, and Chemical Engineering are benefiting from this core facility. Samples studied include proteins, nucleic acids, sugars, lipids, synthetic polymers, small molecules, natural products, and virus capsids. This facility has led to higher throughput of data, which has been leveraged into grant support, attracting new faculty hire and has led to some exciting publications. © 2016 Elsevier Inc. All rights reserved.

  15. Electronic detecting equipment in the Camac standard

    International Nuclear Information System (INIS)

    Basiladze, S.G.

    1981-01-01

    Basic tends of development of electron detecting equipment of modern facilities for experiments in nuclear physics are considered. Special attention is paid to developments of specialized hybrid integrated circuits, specialized processors for selection of events, usage of integrated circuits of memories in detecting units as well as to prospects of developing nuclear electronics standards [ru

  16. Water supply rates for recirculating evaporative cooling systems in poultry housing

    Science.gov (United States)

    Evaporative cooling (EC) is an important tool to reduce heat stress in animal housing systems. Expansion of ventilation capacity in tunnel ventilated poultry facilities has resulted in increased water demand for EC systems. As water resources become more limited and costly, proper planning and des...

  17. Underwater Calibration of Dome Port Pressure Housings

    Science.gov (United States)

    Nocerino, E.; Menna, F.; Fassi, F.; Remondino, F.

    2016-03-01

    Underwater photogrammetry using consumer grade photographic equipment can be feasible for different applications, e.g. archaeology, biology, industrial inspections, etc. The use of a camera underwater can be very different from its terrestrial use due to the optical phenomena involved. The presence of the water and camera pressure housing in front of the camera act as additional optical elements. Spherical dome ports are difficult to manufacture and consequently expensive but at the same time they are the most useful for underwater photogrammetry as they keep the main geometric characteristics of the lens unchanged. Nevertheless, the manufacturing and alignment of dome port pressure housing components can be the source of unexpected changes of radial and decentring distortion, source of systematic errors that can influence the final 3D measurements. The paper provides a brief introduction of underwater optical phenomena involved in underwater photography, then presents the main differences between flat and dome ports to finally discuss the effect of manufacturing on 3D measurements in two case studies.

  18. The Valduc waste incineration facility starts operations (iris process)

    International Nuclear Information System (INIS)

    Chateauvieux, H.; Guiberteuau, P.; Longuet, T.; Lannaud, J.; Lorich, M.

    1998-01-01

    In the operation of its facilities the Valduc Research Center produces alpha-contaminated solid waste and thus decided to build an incineration facility to treat the most contaminated combustible waste. The process selected for waste incineration is the IRIS process developed by the CEA at the Marcoule Nuclear Research Center. The Valduc Center asked SGN to build the incineration facility. The facility was commissioned in late 1996, and inactive waste incineration campaigns were run in 1997. The operator conducted tests with calibrated radioactive sources to qualify the systems for measuring holdup of active material from outside the equipment. Chlorinated waste incineration test runs were performed using the phosphatizing process developed by the Marcoule Research Center. Inspections performed after these incineration runs revealed the complete absence of corrosion in the equipment. Active commissioning of the facility is scheduled for mid-1998. The Valduc incinerator is the first industrial application of the IRIS process. (author)

  19. A Design for an Orbital Assembly Facility for Complex Missions

    Science.gov (United States)

    Feast, S.; Bond, A.

    A design is presented for an Operations Base Station (OBS) in low earth orbit that will function as an integral part of a space transportation system, enabling assembly and maintenance of a Cis-Lunar transportation infrastructure and integration of vehicles for other high energy space missions to be carried out. Construction of the OBS assumes the use of the SKYLON Single-Stage-to-Orbit (SSTO) spaceplane, which imposes design and assembly constraints due to its payload mass limits and payload bay dimensions. It is assumed that the space transport infrastructure and high mission energy vehicles would also make use of SKYLON to deploy standard transport equipment and stages bound by these same constraints. The OBS is therefore a highly modular arrangement, incorporating some of these other vehicle system elements in its layout design. Architecturally, the facilities of the OBS are centred around the Assembly Dock which is in the form of a large cylindrical spaceframe structure with two large doors on either end incorporating a skin of aluminised Mylar to enclose the dock. Longitudinal rails provide internal tether attachments to anchor vehicles and components while manipulators are used for the handling and assembling of vehicle structures. The exterior of the OBS houses the habitation modules for workforce and vehicle crews along with propellant farms and other operational facilities.

  20. City of Ljubljana: Its housing, population and housing conditions

    Directory of Open Access Journals (Sweden)

    Maša Filipovič

    2007-01-01

    Full Text Available The article gives an overview of key aspect of housing in Municipality of Ljubljana. The characteristics of households, of housing and their relation influence the housing situation in the city. Characteristic of housing refer mainly to quality of the dwellings, affordability and correspondence to the wishes of the inhabitants. The second important dimensions are households and their characteristics. In Europe and Slovenia increase in number of household can be observed, which in turn are becoming smaller. The housing policy has a role in establishing a balance between households and housing, i.e. ensuring that housing corresponds to the needs of individual households and to their number. For achieving this, knowledge and appropriate data are of vital importance. In the article we present the results of the Housing survey 2005. We observe housing conditions in a comparative perspective (Ljubljana in comparison to Maribor, Slovenia and selected European cities and according to three dimensions: housing fund, households and housing conditions.