WorldWideScience

Sample records for hole horizontal drilling

  1. HORIZONTAL WELL DRILL-IN FLUIDS

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    1998-12-01

    Full Text Available Main objective of horizontal driling is to place a drain-hole for a long distance within the pay zone to enhance productivity or injectivity. In drilling horizontal wells, more serious problems appear than in drilling vertical wells. These problems are: poor hole cleaning, excessive torque and drag, hole filling, pipe stucking, wellbore instability, loss of circulation, formation damage, poor cement job, and difficulties at logging jobs. From that reason, successful drilling and production of horizontal well depends largely on the fluid used during drilling and completion phases. Several new fluids, that fulfill some or all of required properties (hole cleaning, cutting suspension, good lubrication, and relative low formation damage, are presented in this paper.

  2. The development of Canadian leadership in horizontal drilling technology

    Energy Technology Data Exchange (ETDEWEB)

    Hawkins, J R

    1989-01-01

    Horizontal wells are of increasing interest in the oil and gas industry, as is evident from the increase in the numbers of such wells being drilled. Horizontal well technology is used to improve production rates, notably in low permeability formations; to capture reserves if a reservoir is not economic using non-horizontal wells; to manage breakthrough of sweep fluids and increase sweep efficiency; and to extend the areal reach from a single surface location, especially in offshore production. The types of horizontal wells, differentiated on the basis of how quickly the well becomes horizontal, are briefly outlined and a short history of horizontal wells is presented. Canadian accomplishments in this field are then described, including steerable drilling systems, measurement-while-drilling systems, management of hole drag and torque, and well completion techniques. About 25 horizontal wells are forecast to be drilled in Canada in 1989, indicating the favorable future of this technology. 2 figs., 5 tabs.

  3. Crosswell Imaging Technology & Advanced DSR Navigation for Horizontal Directional Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Larry Stolarczyk

    2008-08-08

    The objective of Phase II is to develop and demonstrate real-time measurement-while-drilling (MWD) for guidance and navigation of drill strings during horizontal drilling operations applicable to both short and long holes. The end product of Phase II is a functional drill-string assembly outfitted with a commercial version of Drill String Radar (DSR). Project Objectives Develop and demonstrate a dual-phase methodology of in-seam drilling, imaging, and structure confirmation. This methodology, illustrated in Figure 1, includes: (1) Using RIM to image between drill holes for seam thickness estimates and in-seam structures detection. Completed, February 2005; and (2) Using DSR for real-time MWD guidance and navigation of drillstrings during horizontal drilling operations. Completed, November 2008. As of November 2008, the Phase II portion of Contract DE-FC26-04NT42085 is about 99% complete, including milestones and tasks original outlined as Phase II work. The one percent deficiency results from MSHA-related approvals which have yet to be granted (at the time of reporting). These approvals are pending and are do not negatively impact the scope of work or project objectives.

  4. Mud pressure simulation on large horizontal directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Placido, Rafael R.; Avesani Neto, Jose O.; Martins, Pedro R.R.; Rocha, Ronaldo [Instituto de Pesquisas Tecnologicas do Estado de Sao Paulo (IPT), Sao Paulo, SP (Brazil)

    2009-07-01

    Horizontal Directional Drilling (HDD) is being extensively used in Brazil for installation of oil and gas pipelines. This trenchless technology is currently used in crossings of water bodies, environmental sensitive areas, densely populated areas, areas prone to mass movement and anywhere the traditional technology is not suitable because of the risks. One of the unwanted effects of HDD is collapsing of the soil surrounding the bore-hole, leading to loss of fluid. This can result in problems such as reducing the drilling efficiency, ground heave, structures damage, fluid infiltration and other environmental problems. This paper presents four simulations of down-hole fluid pressures which represents two different geometrical characteristics of the drilling and two different soils. The results showed that greater depths are needed in longer drillings to avoid ground rupture. Thus the end section of the drilling often represents the critical stage. (author)

  5. Horizontal drilling under Lake Erie

    Energy Technology Data Exchange (ETDEWEB)

    Meller, R.

    2001-07-01

    Drilling oil wells under Lake Erie calls for horizontal drilling wells to be drilled from shore out into the pay-zone under the lake. The nature and characteristics of horizontal wells as compared to vertical wells are explored. Considerations that have to be taken into account in drilling horizontal wells are explained (the degree of curvature, drilling fluid quality, geosteering in the pay-zone, steering instrumentation, measurements while drilling (MWD), logging while drilling (LWD)). The concept and reasons for extended reach wells are outlined, along with characteristic features of multilateral wells.

  6. Drilling miniature holes, Part III

    Energy Technology Data Exchange (ETDEWEB)

    Gillespie, L.K.

    1978-07-01

    Miniature components for precision electromechanical mechanisms such as switches, timers, and actuators typically require a number of small holes. Because of the precision required, the workpiece materials, and the geometry of the parts, most of these holes must be produced by conventional drilling techniques. The use of such techniques is tedious and often requires considerable trial and error to prevent drill breakage, minimize hole mislocation and variations in hole diameter. This study of eight commercial drill designs revealed that printed circuit board drills produced better locational and size repeatability than did other drills when centerdrilling was not used. Boring holes 1 mm in dia, or less, as a general rule did not improve hole location in brass or stainless steel. Hole locations of patterns of 0.66-mm holes can be maintained within 25.4-..mu..m diametral positional tolerance if setup misalignments can be eliminated. Size tolerances of +- 3.8 ..mu..m can be maintained under some conditions when drilling flat plates. While these levels of precision are possible with existing off-the-shelf drills, they may not be practical in many cases.

  7. Geology of the U12n.07 UG-3 drill hole, area 12, Nevada Test Site

    International Nuclear Information System (INIS)

    Terry, S.S.; Cunningham, M.J.

    1975-11-01

    The U12n.07 UG-3 horizontal drill hole, located near the eastern edge of the center of Rainier Mesa, Nevada Test Site, was drilled to a total depth of 809 m (2,653 ft). This hole was drilled to further evaluate the tunnel-level stratigraph, and structure southwest of the U12n tunnel complex. The drill hole is collared in the middle of Tertiary tunnel bed 3A and penetrates upsection through tunnel beds 3 and 4 and terminates in subunit 4K, all of Tertiary age. Stratigraphy, structure, engineering geology, and physical properties and their relation to tunnel engineering are discussed

  8. An economic alternative to conventional open hole logging in horizontal wells; Eine oekonomische Alternative zu konventionellen Bohrlochmessungen in Horizontalbohrungen

    Energy Technology Data Exchange (ETDEWEB)

    Hogan, G.P.; Kater, H.; Ball, S.; Preiss, F. [Precision Drilling-Computalog, Edemissen (Germany)

    2003-04-01

    Horizontal drilling has become a routine method of field development over the past several years as a means to maximise recoverable reserves. As such, horizontal drilling has impacted the way that petrophysical data is obtained in order to evaluate the reservoir during and after drilling. In horizontal wells, conventional open hole logging methods must be combined with either pipe conveyed logging techniques or coiled tubing conveyed techniques. In many cases, these procedures are time consuming and cost prohibitive based on the economics of the project. Additionally, formation evaluation data may be obtained in horizontal wells by using Logging While Drilling (LWD) technology, but this may also be cost prohibitive in many areas. In the Girkaliai and Nausodis Fields in Lithuania, two wells were drilled to reach oil producing reservoir sandstones at depths of over 1,800 m TVD with horizontal sections of approximately 270 m and 385 m. Based on an economic and petrophysical analysis, neither open hole pipe conveyed logging nor LSW were considered since neither were regarded as cost effective to obtain the petrophysical data required to evaluate the reservoir. An alternative method to obtain critical formation evaluation data was employed utilizing a cased hole pulsed neutron decay logging tool run in the open hole. In one case this was done immediately after drilling. The pulsed neutron decay logging tool was conveyed to TD by a specially modified wireline tractor system. The obtained logs provided critical information to evaluate the reservoir including determining density porosity, neutron porosity, sigma (formation capture cross section) and gamma ray. The data was used to calculate required petrophysical information including lithology, water saturation, and bulk volumes. (orig.)

  9. Alteration in the IRDP drill hole compared with other drill holes in Iceland

    Science.gov (United States)

    Kristmannsdóttir, Hrefna

    1982-08-01

    The overall alteration pattern in the drill hole at Reydarfjördur is very similar to alteration patterns observed in Icelandic geothermal areas and in low-grade metamorphosed basalts in deep crustal sections elsewhere in Iceland. However more detail is obtained by the study of the IRDP drill core than by study of drill cuttings sampled in previous drill holes in Iceland. A comparatively high fossil thermal gradient is obtained at Reydarfjördur by a combination of mineral stability data and the observed occurence of secondary minerals. This high gradient is consistent with the measured dike dilation at the drill site and the location of the drill site adjacent to a central volcano.

  10. Importance of drill string assembly swivel in horizontal drilling

    Directory of Open Access Journals (Sweden)

    Edmund Tasak

    2006-10-01

    Full Text Available A part of the drill string – the swivel (rotational connector – accomplishes an important task in the horizontal drilling. Its malfunctioning makes it impossible to draw in ( install large diameter and length pipelines. The causes of the connector break-down during the horizontal drilling are investigated in the paper. The drilling has been made for twenty inches gas pipeline installation during reaming operations. A trouble was encountered making good work conditions of a system consisting of the drilling machine drill string reamer swivel tube shield of Cardan joint and the gas pipeline 500 m long. In this case, the swivel brokes down and the planned operation was not finished. The assessment of improper drilling conditions, selection of operation system components, and drilling parameters and the insufficient technological supervising have created an excessive risk of failure. A proper application of technical analysis would considerably decrease the hazard of failure which cause large costs, delays and decrease of confidence to the drilling contractor and pipeline installation.

  11. Horizontal drilling assessment in Western Canada

    International Nuclear Information System (INIS)

    Catania, Peter; Wilson, Malcolm

    1999-01-01

    The first horizontal well was drilled in Saskatchewan in 1987. Since then, the number of horizontal wells drilled has escalated rapidly, averaging approximately 500 per year since 1993. When combined with horizontal wells drilled in Alberta, the major Canadian oil-producing province, the total number drilled in 1995 was 978. This total exceeds the National Energy Board (NEB) projected maximum of 816 wells per year. The NEB projections were based on a break-even point for the drilling of horizontal wells of a return of CDN $285,000 using a discount rate of 15%. This corresponded to a cumulative production from each individual well of some 11,000 m 3 . The introduction of a royalty-free production volume of 12,000 m 3 per horizontal well in Saskatchewan was instrumental in stimulating the rapid expansion in the use of horizontal wells and helping Canada to exceed the forecasted drilling level. Within Saskatchewan, daily production from 1964 active horizontal wells is in excess of 20,000 m 3 . Comparative analysis indicates that the average daily production per well has increased from approximately by 40% with the advent of horizontal wells. In total production terms, provincial production has increased from 11.7 million cubic metres in 1989 to 20.9 million m 3 in 1996. This represents an increase of almost 79% based primarily on the extensive use of horizontal wells. In 1996, horizontal wells produced 36% of the province's oil from 12% of the active wells. In the southeastern producing areas of Saskatchewan, the Williston Basin, declining oil-production has jumped 100%, with horizontal wells accounting for approximately 50% of total regional production. Pay zones in this areas, as in most of the province, tend to be relatively thin, with net pay frequently less that 5 m. The modest investment of some CDN $5 million in government research funding 10 years ago to stimulate the development of horizontal wells, combined with a favourable royalty structure, has been at

  12. DOE HIGH-POWER SLIM-HOLE DRILLING SYSTEM

    Energy Technology Data Exchange (ETDEWEB)

    Dr. William C. Maurer; John H. Cohen; J. Chris Hetmaniak; Curtis Leitko

    1999-09-01

    This project used a systems approach to improve slim-hole drilling performance. A high power mud motor, having a double-length power section, and hybrid PDC/TSP drill bit were developed to deliver maximum horsepower to the rock while providing a long life down hole. This high-power slim-hole drilling system drills much faster than conventional slim-hole motor and bit combinations and holds significant potential to reduce slim-hole drilling costs. The oil and gas industries have been faced with downward price pressures since the 1980s. These pressures are not expected to be relieved in the near future. To maintain profitability, companies have had to find ways to reduce the costs of producing oil and gas. Drilling is one of the more costly operations in the production process. One method to reduce costs of drilling is to use smaller more mobile equipment. Slim holes have been drilled in the past using this principle. These wells can save money not only from the use of smaller drilling equipment, but also from reduced tubular costs. Stepping down even one casing size results in significant savings. However, slim holes have not found wide spread use for three reasons. First, until recently, the price of oil has been high so there were no forces to move the industry in this direction. Second, small roller bits and motors were not very reliable and they drilled slowly, removing much of the economic benefit. The third and final reason was the misconception that large holes were needed everywhere to deliver the desired production. Several factors have changed that will encourage the use of slim holes. The industry now favors any method of reducing the costs of producing oil and gas. In addition, the industry now understands that large holes are not always needed. Gas, in particular, can have high production rates in smaller holes. New materials now make it possible to manufacture improved bits and motors that drill for long periods at high rates. All that remains is to

  13. Modern Shale Gas Horizontal Drilling: Review of Best Practices for Exploration Phase Planning and Execution

    Institute of Scientific and Technical Information of China (English)

    Nathaniel Harding; Stephen Smith; John Shelton; Mike D. Bumaman

    2009-01-01

    The challenging characteristics of shale formations often require horizontal drilling to economically develop their potential. While every shale gas play is unique, there are several best practices for the proper planning and execution of a horizontal well. In planning a horizontal well, the optimal method and technology for building inclination and extending the lateral section must be determined. Properly specified logging-while-drilling tools are essential to keep the wellbore within the target formation. Planning must also focus on casing design. Doing so will help ensure stability and enable reliable and productive completions. Shales pose a challenge for these elements of well planning due to their thin strata and potentially low mechanical competence when foreign fluids are introduced. Once a plan is developed, executing it is even more important to prove a viable exploration program. Fast, efficient drilling with wellbore control and minimal torque and drag should be the priority. This may be achieved by focusing on fluid hydraulics and rheology and bottom hole assembly. Managed pressure drilling (MPD) will help fast drilling, well control and stability. If MPD can be combined with new generation rotary steerable systems that allow the drill string to maintain rotation, impressive efficiencies are possible. Modern drilling parameter analysis represents the newest opportunity for executing shale gas horizontal wells. A method for ROP analysis to improve operational parameters and equipment selection is also proposed.

  14. Design of a machine to bore and line a long horizontal hole in tuff: Nevada Nuclear Waste Storage Investigations Project

    International Nuclear Information System (INIS)

    Friant, J.E.; Dowden, P.B.

    1987-09-01

    This report describes an engineering design for equipment capable of simultaneously drilling and lining deep horizontal bore holes. The ultimate use of the equipment is to bore up to 600 ft long, 3 ft diameter emplacement holes for a nuclear waste repository. The specific system designed is referred to as a Development Prototype Boring Machine (DPBM) which will be used to demonstrate the drilling/lining capability in field development tests. The system utilizes as in-hole electric drive and a vacuum chip removal and handling system. The drilling unit is capable of active directional control and uses laser-type alignment equipment. The system combines the features of a small steerable tunnel boring machine, combined with a horizontally-oriented raise drill, thereby utilizing current technology. All elements of the system are compact and mobile as required for a shaft entry, underground mining environment. 3 refs., 35 figs., 1 tab

  15. 30 CFR 77.1011 - Drill holes; guarding.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drill holes; guarding. 77.1011 Section 77.1011 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH... Control § 77.1011 Drill holes; guarding. Drill holes large enough to constitute a hazard shall be covered...

  16. Environmental Measurement-While-Drilling System and Horizontal Directional Drilling Technology Demonstration, Hanford Site

    International Nuclear Information System (INIS)

    Williams, C.V.; Lockwood, G.J.; Normann, R.A.; Myers, D.A.; Gardner, M.G.; Williamson, T.; Huffman, J.

    1999-01-01

    The Environmental Measurement-While-Drilling (EMWD) system and Horizontal Directional Drilling (HDD) were successfully demonstrated at the Mock Tank Leak Simulation Site and the Drilling Technology Test Site, Hanford, Washington. The use of directional drilling offers an alternative to vertical drilling site characterization. Directional drilling can develop a borehole under a structure, such as a waste tank, from an angled entry and leveling off to horizontal at the desired depth. The EMWD system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental and drill bit data during drilling operations. The technology demonstration consisted of the development of one borehole under a mock waste tank at a depth of approximately minus8 m (minus27 ft.), following a predetermined drill path, tracking the drill path to within a radius of approximately1.5 m (5 ft.), and monitoring for zones of radiological activity using the EMWD system. The purpose of the second borehole was to demonstrate the capability of drilling to a depth of ∼ -21 m (-70 ft.), the depth needed to obtain access under the Hanford waste tanks, and continue drilling horizontally. This report presents information on the HDD and EMWD technologies, demonstration design, results of the demonstrations, and lessons learned

  17. Drilling history core hole DC-8

    International Nuclear Information System (INIS)

    1978-10-01

    Core hole DC-8 was completed in August, 1978 by Boyles Brothers Drilling Company, Spokane, Washington, under subcontract to Fenix and Scission, Inc. The hole was cored for the US Department of Energy and the Rockwell Hanford Operations' Basalt Waste Isolation Program. Fenix and Scisson, Inc. furnished the engineering, daily supervision of the core drilling activities, and geologic core logging for hole DC-8. Core hole DC-8 is located on the Hanford Site near the Wye Barricade and 50 feet northwest of rotary hole DC-7. The Hanford Site vation coordinates for DC-8 are North 14,955.94 feet and West 14,861.92 coordinates for DC-8 are North 14,955.94 feet and West 14,861.92 mean sea level. The purpose of core hole DC-8 was to core drill vertically through the basalt and interbed units for stratigraphic depth determination and core collection, and to provide a borehole for hydrologic testing and cross-hole seismic shear and pressure wave velocity studies with rotary hole DC-7. The total depth of core hole DC-8 was 4100.5 feet. Core recovery exceeded 97 percent of the total footage cored

  18. Drilling history core hole DC-8

    Energy Technology Data Exchange (ETDEWEB)

    1978-10-01

    Core hole DC-8 was completed in August, 1978 by Boyles Brothers Drilling Company, Spokane, Washington, under subcontract to Fenix and Scission, Inc. The hole was cored for the US Department of Energy and the Rockwell Hanford Operations' Basalt Waste Isolation Program. Fenix and Scisson, Inc. furnished the engineering, daily supervision of the core drilling activities, and geologic core logging for hole DC-8. Core hole DC-8 is located on the Hanford Site near the Wye Barricade and 50 feet northwest of rotary hole DC-7. The Hanford Site vation coordinates for DC-8 are North 14,955.94 feet and West 14,861.92 coordinates for DC-8 are North 14,955.94 feet and West 14,861.92 mean sea level. The purpose of core hole DC-8 was to core drill vertically through the basalt and interbed units for stratigraphic depth determination and core collection, and to provide a borehole for hydrologic testing and cross-hole seismic shear and pressure wave velocity studies with rotary hole DC-7. The total depth of core hole DC-8 was 4100.5 feet. Core recovery exceeded 97 percent of the total footage cored.

  19. Drilling history core hole DC-4

    International Nuclear Information System (INIS)

    1978-12-01

    Core hole DC-4 was completed at a depth of 3998 feet in December, 1978 by Boyles Brothers Drilling Company, Spokane, Washington, under subcontract to Fenix and Scission, Inc. The hole was cored for the US Department of Energy and the Rockwell Hanford Operations' Basalt Waste Isolation Program. Fenix and Sicsson, Inc. furnished the engineering, daily supervision of the cable tool and core drilling activities, and geological core logging for DC-4. Core hole DC-4 is located on the Hanford Site about 3 miles east of the Yakima Barricade and approximately 103 feet southwest of rotary hole DC-5, which was completed to 3990 feet in February, 1978. Hanford Site coordinates reported for hole DC-4 are north 49,385.62 feet and west 85,207.63 feet, and Washington State coordinates are north 454,468.73 feet and east 2,209,990.87 feet. No elevation survey is available for hole DC-4, but it is approximately 745 feet above mean sea level based upon the survey of hole DC-5, which has a reported elevation of 745.16 feet on the top of the 3-inch flange. The purpose of core hole DC-4 was to core drill vertically through the basalt and interbed units for stratigraphic depth determination and core collection, and to provide a borehole for hydrologic testing, cross-hole seismic shear, and pressure wave velocity studies with rotary hole DC-5. Hole DC-4 was drilled through the overburden into basalt bedrock by cable tool methods (0-623 feet) and continuously cored through the final interval (623 to 3998 feet).Core recovery was 95.8 percent of the total footage cored

  20. Big-hole drilling - the state of the art

    International Nuclear Information System (INIS)

    Lackey, M.D.

    1983-01-01

    The art of big-hole drilling has been in a continual state of evolution at the Nevada Test Site since the start of underground testing in 1961. Emplacement holes for nuclear devices are still being drilled by the rotary-drilling process, but almost all the hardware and systems have undergone many changes during the intervening years. The current design of bits, cutters, and other big-hole-drilling hardware results from contributions of manufacturers and Test Site personnel. The dual-string, air-lift, reverse-circulation system was developed at the Test Site. Necessity was really the Mother of this invention, but this circulation system is worthy of consideration under almost any condition. Drill rigs for big-hole drilling are usually adaptations of large oil-well drill rigs with minor modifications required to handle the big bits and drilling assemblies. Steel remains the favorite shaft lining material, but a lot of thought is being given to concrete linings, especially precast concrete

  1. 30 CFR 56.7013 - Covering or guarding drill holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Covering or guarding drill holes. 56.7013 Section 56.7013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Rotary Jet Piercing Drilling § 56.7013 Covering or guarding drill holes. Drill holes large enough to...

  2. 30 CFR 57.7013 - Covering or guarding drill holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Covering or guarding drill holes. 57.7013 Section 57.7013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... and Rotary Jet Piercing Drilling-Surface Only § 57.7013 Covering or guarding drill holes. Drill holes...

  3. Prediction Model of Mechanical Extending Limits in Horizontal Drilling and Design Methods of Tubular Strings to Improve Limits

    Directory of Open Access Journals (Sweden)

    Wenjun Huang

    2017-01-01

    Full Text Available Mechanical extending limit in horizontal drilling means the maximum horizontal extending length of a horizontal well under certain ground and down-hole mechanical constraint conditions. Around this concept, the constrained optimization model of mechanical extending limits is built and simplified analytical results for pick-up and slack-off operations are deduced. The horizontal extending limits for kinds of tubular strings under different drilling parameters are calculated and drawn. To improve extending limits, an optimal design model of drill strings is built and applied to a case study. The results indicate that horizontal extending limits are underestimated a lot when the effects of friction force on critical helical buckling loads are neglected. Horizontal extending limits firstly increase and tend to stable values with vertical depths. Horizontal extending limits increase faster but finally become smaller with the increase of horizontal pushing forces for tubular strings of smaller modulus-weight ratio. Sliding slack-off is the main limit operation and high axial friction is the main constraint factor constraining horizontal extending limits. A sophisticated installation of multiple tubular strings can greatly inhibit helical buckling and increase horizontal extending limits. The optimal design model is called only once to obtain design results, which greatly increases the calculation efficiency.

  4. Fran Ridge horizontal coring summary report hole UE-25h No. 1, Yucca Mountain Area, Nye County, Nevada

    International Nuclear Information System (INIS)

    Norris, A.E.; Byers, F.M. Jr.; Merson, T.J.

    1986-10-01

    Hole UE-25h No. 1 was core drilled during December 1982 and January 1983 within several degrees of due west, 400 ft horizontally into the southeast slope of Fran Ridge at an altitude of 3409 ft. The purpose of the hole was to obtain data pertinent for radionuclide transport studies in the Topopah Spring Member of the Paintbrush Tuff. This unit had been selected previously as the host rock for the potential underground nuclear waste repository at Yucca Mountain, adjacent to the southwestern part of the Nevada Test Site. The hole was core drilled first with air, then with air mist, and finally with air, soap, and water. Many problems were encountered, including sloughing of tuff into the uncased hole, vibration of the drill rods, high rates of bit wear, and lost circulation of drilling fluids. On the basis of experience gained in drilling this hole, ways to improve horizontal coring with air are suggested in this report. All of the recovered core, except those pieces that were wrapped and waxed, were examined for lithophysal content, for fractures, and for fracture-fill mineralization. The results of this examination are given in this report. Core recovery greater than 80% at between 209 and 388 ft permitted a fracture frequency analysis. The results are similar to the fracture frequencies observed in densely welded nonlithophysal tuff from holes USW GU-3 and USW G-4. The fractures in core from UE-25h No. 1 were found to be smooth and nonmineralized or coated with calcite, silica, or manganese oxide. Open fractures with caliche (porous, nonsparry calcite) were not observed beyond 83.5 ft, which corresponds to an overburden depth of 30 ft

  5. Numerical analysis of drilling hole work-hardening effects in hole-drilling residual stress measurement

    Science.gov (United States)

    Li, H.; Liu, Y. H.

    2008-11-01

    The hole-drilling strain gage method is an effective semi-destructive technique for determining residual stresses in the component. As a mechanical technique, a work-hardening layer will be formed on the surface of the hole after drilling, and affect the strain relaxation. By increasing Young's modulus of the material near the hole, the work-hardening layer is simplified as a heterogeneous annulus. As an example, two finite rectangular plates submitted to different initial stresses are treated, and the relieved strains are measured by finite element simulation. The accuracy of the measurement is estimated by comparing the simulated residual stresses with the given initial ones. The results are shown for various hardness of work-hardening layer. The influence of the relative position of the gages compared with the thickness of the work-hardening layer, and the effect of the ratio of hole diameter to work-hardening layer thickness are analyzed as well.

  6. Study of the radon released from open drill holes

    International Nuclear Information System (INIS)

    Pacer, J.C.

    1981-06-01

    The radon emanating from three open drill holes was measured at a site of known uranium mineralization in the Red Desert of south central Wyoming. The radon flux from the soil and drill holes was measured by the accumulator method with activated charcoal cartridges. The surface soil was found to release radon at an average rate of 0.41 atoms/cm 2 /sec; the radon emanating from the holes was more variable than that from the soil. The three holes studied released an average of 47 atoms/cm 2 /sec of radon. This average is equivalent to the radon released to the atmosphere by 14.5 ft 2 of soil. The data indicate that the radon emanated from an open drill hole is not as significant as other possible activities at a drill site (i.e. digging a trench or drilling a hole) or from household activities involving the usage of water

  7. Study on super-long deep-hole drilling of titanium alloy.

    Science.gov (United States)

    Liu, Zhanfeng; Liu, Yanshu; Han, Xiaolan; Zheng, Wencui

    2018-01-01

    In this study, the super-long deep-hole drilling of a titanium alloy was investigated. According to material properties of the titanium alloy, an experimental approach was designed to study three issues discovered during the drilling process: the hole-axis deflection, chip morphology, and tool wear. Based on the results of drilling experiments, crucial parameters for the super-long deep-hole drilling of titanium alloys were obtained, and the influences of these parameters on quality of the alloy's machining were also evaluated. Our results suggest that the developed drilling process is an effective method to overcome the challenge of super-long deep-hole drilling on difficult-to-cut materials.

  8. Technology of double casing tubes & a binary cycle system for hole cleaning for CBM multi-branch horizontal wells

    Directory of Open Access Journals (Sweden)

    Yong Yang

    2017-03-01

    Full Text Available At present, the aeration-assisted cutting-carrying technology is faced with complexities in the drilling of CBM multi-branch horizontal wells. For example, the aerating pressure is hardly maintained, and the borehole instability may happen. In view of these prominent problems, the technology of double casing tubes & a binary cycle system suitable for CBM multi-branch horizontal wells was developed according to the Venturi principle by means of parasitic tube insufflation which is used for well control simulation system. Then, a multiphase flow finite element model was established for the fluid-cutting particle system in this drilling condition. This technology was tested in field. Double-casing tubes cementing is adopted in this technology and a jet generator is installed at the bottom of the inner casing. In the process of drilling, the drilling fluid injected through double intermediate casing annulus is converted by the jet generator into a high-efficiency steering water jet, which, together with the water jet generated by the bit nozzle, increases the fluid returning rate in the inner annulus space. It is indicated from simulation results that the cutting-carrying effect is the best when the included angle between the nozzle of the jet generator and the vertical direction is 30°. Besides, the influential laws of cutting size, primary cycle volume, accessory cycle volume and drilling velocity on hole cleaning are figured out. It is concluded that this technology increases the flow rate of drilling fluid in annulus space, the returning rate of drilling fluid significantly and the cutting-carrying capacity. It is currently one of the effective hole cleaning technologies for CBM multi-branch horizontal wells where fresh water is taken as the drilling fluid.

  9. Horizontal drilling in Miocene thin sand of Lake Maracaibo

    Energy Technology Data Exchange (ETDEWEB)

    Partidas, C. [PDVSA Exploration and Production (Venezuela)

    1998-12-31

    Horizontal drilling in the mature Lake Maracaibo field in Venezuela as a means of stimulating production are discussed. The Miocene sand where the horizontal well technology was applied, presented a number of intervals of unconsolidated sand of varied continuity, pay intervals at ten to twenty feet thickness, and reservoir pressures mostly at hydrostatic or below hydrostatic values. This paper evaluates a horizontal drilling program in the Lagunallis Lago Production Unit of Maracaibo, involving 91 wells to date (since 1995). When assessed in economic terms, results indicate that horizontal wells are a better economic alternative than vertical wells. The same results also showed that drainage from thin sand reservoirs resulted in better production with horizontal well technology than production from vertical wells. Payout was less than two years for 50 per cent of the horizontal wells while 40 per cent had payouts of between two and four years. Profit to investment ratio was greater than two in the case of about 70 per cent of the horizontal wells drilled in 1996. 2 tabs., 10 figs.

  10. Overview of Appalachian Basin high-angle and horizontal air and mud drilling

    International Nuclear Information System (INIS)

    Yost, A.B. III; Javins, B.H.

    1991-01-01

    The United States Department of Energy's Morgantown Energy Technology Center has been investigating the potential of using high angle and horizontal drilling technology to improve gas production from low permeability reservoirs for more than 20 years. A chronology of 45 high angle and horizontal wells have been identified to show the date, type well, type build curve, location, formation and the type of application. The historical well drilling events that have taken place since the first well are discussed to evaluate the progress in developing the technology. Detailed discussion about how the drilling technology developed in the Appalachian Basin for directional drilling and completion was provided. A discussion of the types of applications for high and horizontal drilling in the Appalachian Basin were identified. A summary of four jointly funded DOE/Industry horizontal wells were discussed to illustrate how the air horizontal drilling technology developed and learning curves for drilling cost and feet per day were provided to illustrate the improvement in the technology and equipment reliability

  11. 30 CFR 816.15 - Casing and sealing of drilled holes: Permanent.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Casing and sealing of drilled holes: Permanent...-SURFACE MINING ACTIVITIES § 816.15 Casing and sealing of drilled holes: Permanent. When no longer needed... exploration hole, other drilled hole or borehole, well, and other exposed underground opening shall be capped...

  12. Drilling history of core hole DB-15

    International Nuclear Information System (INIS)

    Diediker, L.D.; Ledgerwood, R.K.

    1980-09-01

    This core hole was drilled to obtain hydrologic and chemical data on the permeable zones of the Saddle Mountains and Wanapum Formations. These data were obtained by testing the zones that were penetrated during drilling. This testing-as-drilled method reduced the potential problems of interflow and water contamination. This report summarizes the drilling and coring operations; geologic logging, hydrologic testing, and geophysical logging activities; and cementing operations of DB-15 during drilling. The successful completion of DB-15 demonstrated that hydrologic testing can be conducted during core drilling operations. More reliable head measurements and uncontaminated representative water samples from isolated permeable zones, which have not been exposed to potential open borehole cross-flow and head equilibration problems, were benefits derived from the testing-as-drilled method. Disadvantages of the technique were a longer time to complete the borehole caused by time required for testing and increased drilling costs due to rig standby time during testing. Extension of the testing-as-drilled method to the drilling of future core holes is recommended. An evaluation should be made of the required hydrologic data and expected borehole stratigraphy before and during drilling to allow uninterrupted drilling in zones of low permeability that can be tested after drilling is complete

  13. Accounting for the temperature conditions during deep prospecting hole drilling

    Energy Technology Data Exchange (ETDEWEB)

    Shcherban, A N; Cheniak, V P; Zolotarenko, U P

    1977-01-01

    A methodology is described for calculating and controlling the temperature in inclined holes in order to establish a non-steady-state heat exchange between the medium circulating in the hole, and the construction components and rock. In order to verify the proposed methodology, the temperature of the drilling fluid is measured directly during the drilling process using a specially-designed automatic device which is lowered into the hole with the drilling string and turned on automatically at a given depth. This device makes it possible to record the drilling fluid temperature on magnetic tape, and convert the sensor signals arriving from the drilling string and the annular space. A comparison of calculation and experimental data confirmed the sufficiently high accuracy of the methods for predicting the thermal conditions in drilling deep prospecting holes.

  14. Slim hole drilling and testing strategies

    Science.gov (United States)

    Nielson, Dennis L.; Garg, Sabodh K.; Goranson, Colin

    2017-12-01

    The financial and geologic advantages of drilling slim holes instead of large production wells in the early stages of geothermal reservoir assessment has been understood for many years. However, the practice has not been fully embraced by geothermal developers. We believe that the reason for this is that there is a poor understanding of testing and reservoir analysis that can be conducted in slim holes. In addition to reservoir engineering information, coring through the cap rock and into the reservoir provides important data for designing subsequent production well drilling and completion. Core drilling requires significantly less mud volume than conventional rotary drilling, and it is typically not necessary to cure lost circulation zones (LCZ). LCZs should be tested by either production or injection methods as they are encountered. The testing methodologies are similar to those conducted on large-diameter wells; although produced and/or injected fluid volumes are much less. Pressure, temperature and spinner (PTS) surveys in slim holes under static conditions can used to characterize temperature and pressure distribution in the geothermal reservoir. In many cases it is possible to discharge slim holes and obtain fluid samples to delineate the geochemical properties of the reservoir fluid. Also in the latter case, drawdown and buildup data obtained using a downhole pressure tool can be employed to determine formation transmissivity and well properties. Even if it proves difficult to discharge a slim hole, an injection test can be performed to obtain formation transmissivity. Given the discharge (or injection) data from a slimhole, discharge properties of a large-diameter well can be inferred using wellbore modeling. Finally, slim hole data (pressure, temperature, transmissivity, fluid properties) together with reservoir simulation can help predict the ability of the geothermal reservoir to sustain power production.

  15. Drilling history core hole DC-6 Hanford, Washington

    International Nuclear Information System (INIS)

    1978-06-01

    Core hole DC-6 was completed in May 1978 by Boyles Brothers Drilling Company, Spokane, Washington, under subcontract to Fenix and Scisson, Inc. The hole was cored for the US Department of Energy and the Rockwell Hanford Operations' Basalt Waste Isolation Program. Fenix and Scisson, Inc. furnished the engineering, daily supervision of the core drilling activities, and geologic core logging for hole DC-6. Core hole DC-6 is located within the boundary of the Hanford Site at the old Hanford town site. The Hanford Site coordinates for DC-6 are North 54,127.17 feet and West 17,721.00 feet. The surface elevation is approximately 402 feet above sea level. The purpose of core hole DC-6 was to core drill vertically through the basalt and interbed units for stratigraphic depth determination and core collection and to provide a borehole for hydrologic testing. The total depth of core hole DC-6 was 4336 feet. Core recovery was 98.4% of the total footage cored

  16. Demonstration of a utility industry horizontal drilling system: Horizontal well AMH-5 installation report

    International Nuclear Information System (INIS)

    1992-01-01

    The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies and systems for cleanup of VOCs in soils and groundwater at the Savannah River Site (SRS) in 1989. The overall goal of the program is demonstration of multiple technologies and systems in the fields of drilling, characterization, monitoring, and remediation at a single test bed. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program. Directional drilling has been shown to be a successful technique for enhancing access to the subsurface, thus improving remediation systems, especially remediation systems which perform in situ. Demonstration of an innovative directional drilling system at the Integrated Demonstration Site at the SRS, was initiated in June of 1992. The directional drilling system was designed to install an in situ remediation system. The drilling system is an experimental compaction/dry drilling technique developed by Charles Machine Works (Ditch Witch reg-sign) of Perry, Oklahoma. A horizontal well was installed in the M Area of the SRS below and parallel to an abandoned tile process sewer line. The installation of the horizontal well was a two-part process. Part one consisted of drilling the borehole, and part two was the horizontal well completion

  17. Micro-hole drilling and cutting using femtosecond fiber laser

    Science.gov (United States)

    Huang, Huan; Yang, Lih-Mei; Liu, Jian

    2014-05-01

    Micro-hole drilling and cutting in ambient air are presented by using a femtosecond fiber laser. At first, the micro-hole drilling was investigated in both transparent (glasses) and nontransparent (metals and tissues) materials. The shape and morphology of the holes were characterized and evaluated with optical and scanning electron microscopy. Debris-free micro-holes with good roundness and no thermal damage were demonstrated with the aspect ratio of 8∶1. Micro-hole drilling in hard and soft tissues with no crack or collateral thermal damage is also demonstrated. Then, trench micromachining and cutting were studied for different materials and the effect of the laser parameters on the trench properties was investigated. Straight and clean trench edges were obtained with no thermal damage.

  18. Mineralogy of drill hole UE-25pnumber1 at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Chipera, S.J.; Bish, D.L.

    1988-05-01

    Drill hole UE-25p/number sign/1 is located east of the candidate repository block at Yucca Mountain, Nevada, and as such provides information on the geology of the accessible environment. The hole was drilled to a depth of 1807 m (5923 ft) and is unique in that it penetrates tuffs that are older than any volcanic units previously encountered in drill holes at Yucca Mountain. In addition, it is the only hole drilled to date that penetrates the base of the tuff sequence and enters the underlying Paleozoic dolomite basement. We have examined the mineralogy of drill cuttings, core, and sidewall samples from drill hole UE-25p/number sign/1 is similar to that in the other drill holes examined at Yucca Mountain. The only significant differences in mineralogy from other drill holes include the presence of dolomite in the Paleozoic carbonate rocks and the occurrence of up to 3% laumontite, a Ca-zeolite, in four samples of the Lithic Ridge Tuff. 15 refs., 5 figs., 4 tabs

  19. Exploring the hole cleaning parameters of horizontal wellbore using two-phase Eulerian CFD approach

    Directory of Open Access Journals (Sweden)

    Satish K Dewangan

    2016-03-01

    Full Text Available The present investigation deals with the flow through concentric annulus with the inner cylinder in rotation. This work has got its importance in the petroleum industries in relation to the wellbore drilling. In wellbore drilling, the issue of the hole-cleaning is very serious problem especially in case of the horizontal drilling process. The effect of the various parameters like slurry flow velocity, inner cylinder rotational speed, inlet solid concentration which affect hole cleaning was discussed. Their effect on the pressure drop, wall shear stress, mixture turbulence kinetic energy, and solid-phase velocity and slip velocity were analyzed, which are responsible for solid-phase distribution. Flow was considered to be steady, incompressible and two-phase slurry flow with water as carrier fluid and silica sand as the secondary phase. Eulerian approach was used for modeling the slurry flow. Silica sand was considered of spherical shape with particle size of 180 µm. ANSYS FLUENT software was used for modeling and solution. Plotting was done using Tecplot software and Microsoft Office.

  20. Drilling holes in rock for final storage of spent nuclear fuel

    International Nuclear Information System (INIS)

    Nord, G.

    1980-09-01

    This report delas with the technical and economic aspects of the drilling of vertical holes with diameters of 1.5 metres and 1 metre in the Swedish bedrock. The holes will be 7.7 metres in depth and located on a level approximately 500 metres below the ground surface. There is no directly applicable technique for the construction of the above-mentioned holes from a small tunnel. The data presented in this report are based to a great extent on information supplied by the manufacturers of drilling equipment, and by underground construction contractors. Three different techniques for drilling the holes have been delat with in the report: shaft boring, stitch drilling (three alternative methods) and core drilling. In order to produce the required 233 holes per year, the following sets of equipment must be purchased, and personnel engaged. A hole with a diameter of 1.5 m and a depth of 7.7 m requires 3 to 7 sets of equipment for shaft boring or stitch drilling and engages 12 to 27 employees. The cost per hole varies between 24.200 and 31.200 SKr. Core drilling requires 7 sets of equipment, engages 29 persons and costs 55.300 SKr per hole. A hole with a diameter of 1.0 m requires less personnel and costs between 19.700 and 25.800 per hole except for core drilling where the cost per hole is estimated to 43.900 SKr. Interest costs account for 10 percent - 15 percent of the above-mentioned costs. Our aim has been to calculate the costs for the different methods on as similar a basis as possible, but a margin of error of +- 15 percent entails and overlapping of the cost span for most of the methods considered. (G.B.)

  1. Effects of specialized drill bits on hole defects of CFRP laminates

    Science.gov (United States)

    Li, Chao; Xu, Jinyang; Chen, Ming

    2018-05-01

    Drilling is a conventional machining process widely applied to carbon fiber reinforced plastics (CFRP) for the riveting and fastening purposes in the aerospace and automotive industries. However, the machining mechanism of CFRP composites differ significantly from that of homogeneous metal alloys owing to their prominent anisotropy and heterogeneity. Serious hole defects such as fiber pullout, matrix debonding and delamination are generally produced during the hole-making process, resulting in the poor machined surface quality, low fatigue durability or even the part rejections. In order to minimize the defects especially the delamination damage in composites drilling, specialized drill bits are often a primary choice being widely adopted in a real production. This paper aims to study the effects of two drills differing in geometrical characteristics during the drilling of CFRP laminates. A number of drilling experiments were carried out with the aim to evaluate the drilling performance of different drill bits. A scanning electron microscope (SEM) was used to observe the drilled surfaces to study the surface roughness. A high frequency scanning acoustic microscope (SAM) was applied to characterize the drilled hole morphologies with a particular focus on the delamination damage occurring in the CFRP laminates. The obtained results indicate that the fiber orientation relative to the cutting direction is a key factor affecting hole morphology and hole wall defects can be reduced by utilizing specialized drill geometries. Moreover, the dagger drill was confirmed outperforming the brad spur drill from the aspect of reducing drilling-induced delamination.

  2. Osseous drill holes to promote granulation tissue: Radiologic appearance

    International Nuclear Information System (INIS)

    Resnik, C.S.; Reiner, B.I.; Diaconis, J.N.; Goldberg, N.H.

    1991-01-01

    Skin grafting following extensive soft-tissue loss is often delayed until adequate granulation tissue can be generated. Surgical drill holes into the marrow cavity promote development of granulation tissue. This article illustrates the radiology appearance of these drill holes in four patients. (orig.)

  3. Small subchondral drill holes improve marrow stimulation of articular cartilage defects.

    Science.gov (United States)

    Eldracher, Mona; Orth, Patrick; Cucchiarini, Magali; Pape, Dietrich; Madry, Henning

    2014-11-01

    Subchondral drilling is an established marrow stimulation technique. Osteochondral repair is improved when the subchondral bone is perforated with small drill holes, reflecting the physiological subchondral trabecular distance. Controlled laboratory study. A rectangular full-thickness chondral defect was created in the trochlea of adult sheep (n = 13) and treated with 6 subchondral drillings of either 1.0 mm (reflective of the trabecular distance) or 1.8 mm in diameter. Osteochondral repair was assessed after 6 months in vivo by macroscopic, histological, and immunohistochemical analyses and by micro-computed tomography. The application of 1.0-mm subchondral drill holes led to significantly improved histological matrix staining, cellular morphological characteristics, subchondral bone reconstitution, and average total histological score as well as significantly higher immunoreactivity to type II collagen and reduced immunoreactivity to type I collagen in the repair tissue compared with 1.8-mm drill holes. Analysis of osteoarthritic changes in the cartilage adjacent to the defects revealed no significant differences between treatment groups. Restoration of the microstructure of the subchondral bone plate below the chondral defects was significantly improved after 1.0-mm compared to 1.8-mm drilling, as shown by higher bone volume and reduced thickening of the subchondral bone plate. Likewise, the microarchitecture of the drilled subarticular spongiosa was better restored after 1.0-mm drilling, indicated by significantly higher bone volume and more and thinner trabeculae. Moreover, the bone mineral density of the subchondral bone in 1.0-mm drill holes was similar to the adjacent subchondral bone, whereas it was significantly reduced in 1.8-mm drill holes. No significant correlations existed between cartilage and subchondral bone repair. Small subchondral drill holes that reflect the physiological trabecular distance improve osteochondral repair in a translational

  4. A Comprehensive Prediction Model of Hydraulic Extended-Reach Limit Considering the Allowable Range of Drilling Fluid Flow Rate in Horizontal Drilling.

    Science.gov (United States)

    Li, Xin; Gao, Deli; Chen, Xuyue

    2017-06-08

    Hydraulic extended-reach limit (HERL) model of horizontal extended-reach well (ERW) can predict the maximum measured depth (MMD) of the horizontal ERW. The HERL refers to the well's MMD when drilling fluid cannot be normally circulated by drilling pump. Previous model analyzed the following two constraint conditions, drilling pump rated pressure and rated power. However, effects of the allowable range of drilling fluid flow rate (Q min  ≤ Q ≤ Q max ) were not considered. In this study, three cases of HERL model are proposed according to the relationship between allowable range of drilling fluid flow rate and rated flow rate of drilling pump (Q r ). A horizontal ERW is analyzed to predict its HERL, especially its horizontal-section limit (L h ). Results show that when Q min  ≤ Q r  ≤ Q max (Case I), L h depends both on horizontal-section limit based on rated pump pressure (L h1 ) and horizontal-section limit based on rated pump power (L h2 ); when Q min  drilling fluid flow rate, while L h2 keeps decreasing as the drilling fluid flow rate increases. The comprehensive model provides a more accurate prediction on HERL.

  5. 30 CFR 816.13 - Casing and sealing of drilled holes: General requirements.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Casing and sealing of drilled holes: General...-SURFACE MINING ACTIVITIES § 816.13 Casing and sealing of drilled holes: General requirements. Each exploration hole, other drill or borehole, well, or other exposed underground opening shall be cased, sealed...

  6. Numerical modelling of cuttings transport in horizontal wells using conventional drilling fluids

    Energy Technology Data Exchange (ETDEWEB)

    Li, Y.; Bjorndalen, E.; Kuru, E. [Alberta Univ., Edmonton, AB (Canada)

    2004-07-01

    Some of the problems associated with poor wellbore cleaning include high drag or torque, slower rate of penetration, formation fractures and difficulty in wellbore steering. Some of the factors that affect cuttings transport include drilling fluid velocity, inclination angle, drilling fluid viscosity and drilling rate. The general practice is to stop drilling when necessary to clean boreholes with viscous pills, pipe rotation or drilling fluid circulation. It is important to predict when drilling should be stopped for remedial wellbore cleaning. This can be accomplished with a transient cuttings transport model which can improve drilling hydraulics, particularly in long horizontal well sections and extended reach (ERD) wells. This paper presents a newly developed 1-dimensional transient mechanistic model of cuttings transport with conventional (incompressible) drilling fluids in horizontal wells. The numerically solved model predicts the height of cutting beds as a function of different drilling operational parameters such as fluid flow rate and rheological characteristics, drilling rates, wellbore geometry and drillpipe eccentricity. Sensitivity analysis has demonstrated the effects of these parameters on the efficiency of solids transport. The proposed model can be used in the creation of computer programs designed to optimize drilling fluid rheology and flow rates for horizontal well drilling. 29 refs., 3 tabs., 12 figs.

  7. Hole Quality Assessment in Drilling of Glass Microballoon/Epoxy Syntactic Foams

    Science.gov (United States)

    Ashrith, H. S.; Doddamani, Mrityunjay; Gaitonde, Vinayak; Gupta, Nikhil

    2018-05-01

    Syntactic foams reinforced with glass microballoons are used as alternatives for conventional materials in structural application of aircrafts and automobiles due to their unique properties such as light weight, high compressive strength, and low moisture absorption. Drilling is the most commonly used process of making holes for assembling structural components. In the present investigation, grey relation analysis (GRA) is used to optimize cutting speed, feed, drill diameter, and filler content to minimize cylindricity, circularity error, and damage factor. Experiments based on full factorial design are conducted using a vertical computer numerical control machine and tungsten carbide twist drills. GRA reveals that a combination of lower cutting speed, filler content, and drill diameter produces a good quality hole at optimum intermediate feed in drilling syntactic foams composites. GRA also shows that the drill diameter has a significant effect on the hole quality. Furthermore, damage on the hole exit side is analyzed using a scanning electron microscope.

  8. Roundness and taper of holes during drilling composites of various thickness by HSS drill bit under dry condition

    Science.gov (United States)

    Sakib, M. S.; Rahman, Motiur; Ferdous, M.; Dhar, N. R.

    2017-12-01

    Polymer Matrix Composites are extending a wide range of applications in aviation in recent eras because of their better economics, well established processing, high temperature properties, high resistance to corrosion and fatigue. Directional properties of composites are dependent on the fibre orientation. Composites being anisotropic in nature are difficult to drill and machining and tooling of the composites remained a great challenge over time. This paper addresses the issues of various machining problems such as delamination, fibre pull-out, cracks on varying drilling parameters like feed rate and drilling speed. Experimental drilling was carried out on Fibre Reinforced Plastic composites with HSS drill bit. Results reveal that as the number of holes increases the entry and exit diameter and tapper of holes vary and also varying composite thickness results in a difference in hole roundness and tapper. This experiment summarizes that for achieving acceptable tool life and hole quality demands a drill designed with composites.

  9. Process for opening up carboniferous seams for underground gasification by drilling production holes downwards

    Energy Technology Data Exchange (ETDEWEB)

    Lokschin, J L; Volk, A F; Starinskii, A A

    1977-12-01

    This process will reduce drilling costs and times by 20 to 25% and will improve gasification under the influence of a thin liquid medium connecting adjacent holes. After determining the approximate depth and thickness of the seam to be opened up, e.g. by geological means, production holes of 100 to 400 mm (diameter) are made down to a depth of 400 m or more, by well-known boring bars and chisels. After passing the top of the seam (the roof of the seam), which can be recognised by discoloration of the drilling liquid, one goes 1/2 to 1 metre deeper and one determines the depth of the roof the seam exactly by the reduced natural radioactivity at the boundary layer, by introducing a gamma sensor on to the boring bar. The production holes are taken down in a second borehold to a free space 0.6 to 2 metres above the floor of the seam (bottom of the seam), according to the thickness of the seam. After replacing the boring bar by a feedpipe one continues to drill using a boring bar of smaller cutting diameter inside this tube. This hole reaches from the foot of the pipe of the feedpipe to the floor of the seam. It is preferably flushed with gas but may be flushed with liquid. A thin liquid introduced into this hole penetrates the surrounding mass of the seam horizontally (unhindered by any armouring) and represents the required connection to neighbouring bores for gasification. The process is suitable for mining coal, combustible shale oil, bituminous rock, heavy natural oil where this process is based on gasification, melting or dissolving of those deposits.

  10. Extended Horizontal Jet Drilling for EGS applications in Petrothermal Environments

    Science.gov (United States)

    Hahn, Simon; Duda, Mandy; Stoeckhert, Ferdinand; Wittig, Volker; Bracke, Rolf

    2017-04-01

    Extended Horizontal Jet Drilling for EGS applications in Petrothermal Environments S. Hahn, M. Duda, F. Stoeckhert, V. Wittig, R. Bracke International Geothermal Centre Bochum High pressure water jet drilling technologies are widely used in the drilling industry. Especially in geothermal and hard rock applications, horizontal (radial) jet drilling is, however, confronted with several limitations like lateral length, hole size and steerability. In order to serve as a serious alternative to conventional stimulation techniques these high pressure jetting techniques are experimentally investigated to gain fundamental knowledge about the fluid-structure interaction, to enhance the rock failing process and to identify the governing drilling parameters. The experimental program is divided into three levels. In a first step jetting experiments are performed under free surface conditions while logging fluid pressures, flow speeds and extracted rock volume. All process parameters are quantified with a self-developed jet-ability index and compared to the rock properties (density, porosity, permeability, etc.). In a second step experiments will be performed under pressure-controlled conditions. A test bench is currently under construction offering the possibility to assign an in-situ stress field to the specimen while penetrating the rock sample with a high pressure water jet or a radial jet drilling device. The experimental results from levels 1 and 2 allow to identify the governing rock failure mechanisms and to correlate them with physical rock properties and limited reservoir conditions. Results of the initial tests do show a clear dependency of achievable penetration depth on the interaction of jetting and rock parameters and an individual threshold of the nozzle outlet velocity can be noticed in order to successfully penetrate different formation types. At level 3 jetting experiments will be performed at simulated reservoir conditions corresponding to 5.000 m depth (e

  11. Geologic investigations of drill hole sloughing problems, Nevada Test Site

    International Nuclear Information System (INIS)

    Drellack, S.L. Jr.; Davies, W.J.; Gonzales, J.L.; Hawkins, W.L.

    1983-01-01

    Severe sloughing zones encountered while drilling large diameter emplacement holes in Yucca Flat, Nevada Test Site, have been identified, correlated and predicted through detailed geologic investigations. In central and southeastern Area 7 and in northern Area 3, the unstable zones are a very fine-grained, well-sorted, unconsolidated sand deposit, probably eolian in origin, which will readily flow into large diameter drill holes. Other areas exhibit hole erosion related to poor induration or extensive zeolitization of the Tertiary tuff units which are very friable and porous. By examining drill hole samples, geophysical logs, caliper logs and drilling histories, these problem zones can be characterized, correlated and then projected into nearby sites. Maps have been generated to show the depth, thickness and areal extent of these strata. In some cases, they are local and have a lenticular geometry, while in others they are quite extensive. The ability to predict such features can enhance the quality of the hole construction and completion operations to avoid costly delays and the loss of valuable testing real estate. The control of hole enlargements will also eliminate related containment concerns, such as stemming uncertainties

  12. Hole quality and burr reduction in drilling aluminium sheets

    DEFF Research Database (Denmark)

    Pilny, Lukas; De Chiffre, Leonardo; Piska, Miroslav

    2011-01-01

    Optimization of the metal drilling process requires creation of minimum amount of burrs and uniform appearance of the drilled holes. In this paper, an experimental investigation was performed on 2 mm sheets of wrought aluminium alloy Al99.7Mg0.5Cu-H24, using 1.6 and 2 mm diameter drills. Cutting...... data, clamping conditions, and drill geometry were varied in order to optimize the process and reach the desired quality. The results revealed possible reduction of burr occurrence on both the entry and exit side of the sheet, requiring no additional deburring. The demand on the uniform appearance...... of drilled holes was fulfilled as well as high productivity achieved. Such optimized process results in a noticeable production cost reduction....

  13. Hole quality and burr reduction in drilling aluminium sheets

    DEFF Research Database (Denmark)

    Pilny, Lukas; De Chiffre, Leonardo; Piska, Miroslav

    2012-01-01

    Optimization of the metal drilling process requires creation of minimum amount of burrs and uniform appearance of the drilled holes. In this paper, an experimental investigation was performed on 2 mm sheets of wrought aluminium alloy Al99.7Mg0.5Cu-H24, using 1.6 and 2 mm diameter drills. Cutting...... data, clamping conditions, and drill geometry were varied in order to optimize the process and reach the desired quality. The results revealed possible reduction of burr occurrence on both the entry and exit side of the sheet, requiring no additional deburring. The demand on the uniform appearance...... of drilled holes was fulfilled as well as high productivity achieved. Such optimized process results in a noticeable production cost reduction....

  14. 30 CFR 816.14 - Casing and sealing of drilled holes: Temporary.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Casing and sealing of drilled holes: Temporary. 816.14 Section 816.14 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT...-SURFACE MINING ACTIVITIES § 816.14 Casing and sealing of drilled holes: Temporary. Each exploration hole...

  15. Cuttings-carried theory and erosion rule in gas drilling horizontal well

    Directory of Open Access Journals (Sweden)

    Wei Na

    2014-01-01

    Full Text Available In gas horizontal drilling, the gas with cuttings will go through the annulus at high speed which will lead strong erosion to the drill tools. This paper proposes a cuttings-carried theory and modified the critical cuttings-carried model for the gas-solid flow. Meanwhile, the erosive energy is obtained through simulating the gas-solid mixture in different conditions. The study result has positive significance on the determination of reasonable injection volume by optimizing construction parameters of horizontal well in gas drilling.

  16. Method for Cleaning Laser-Drilled Holes on Printed Wiring Boards by Plasma Treatment

    Science.gov (United States)

    Hirogaki, Toshiki; Aoyama, Eiichi; Minagi, Ryu; Ogawa, Keiji; Katayama, Tsutao; Matsuoka, Takashi; Inoue, Hisahiro

    We propose a new method for cleaning blind via holes after laser drilling of PWBs using oxygen plasma treatment. This report dealt with three kinds of PWB materials: epoxy resin and two kinds of aramid fiber reinforced plastics (AFRP: Technora or Kevlar fiber reinforcement). We observed the drilled holes after plasma treatment using both an optical and a scanning electric microscope (SEM). It was confirmed that adequate etching took place in the drilled holes by plasma treatment. We also compared the hole wall and hole bottom after plasma treatment with ones after chemical etching. It was clear that there was no damage to the aramid fiber tip on the hole wall, and that a smooth roughness of the hole wall was obtained by means of plasma treatment. As a result, we demonstrated that the plasma treatment is effective in cleaning the laser drilled holes of PWBs.

  17. Permeability of granular beds emplaced in vertical drill holes

    International Nuclear Information System (INIS)

    Griffiths, S.K.; Morrison, F.A. Jr.

    1979-01-01

    To determine the permeabilities of granular materials emplaced in vertical drill holes used for underground nuclear tests, an experiment at the USDOE Nevada Test Site (NTS) was conducted. As the hole is being filled, falling material increases pressure above and within the granular beds beneath. When the filling operation starts or stops, a transient pressure response occurs within the beds; measurements of this response in beds of various compositions were made. The permeabilities after emplacement were found by matching analytical predictions of the response to these data. This information is useful in assuring the containment of nuclear tests conducted in such drill holes

  18. Hole-to-surface resistivity measurements at Gibson Dome (drill hole GD-1) Paradox basin, Utah

    Science.gov (United States)

    Daniels, J.J.

    1984-01-01

    Hole-to-surface resistivity measurements were made in a deep drill hole (GD-1), in San Juan County, Utah, which penetrated a sequence of sandstone, shale, and evaporite. These measurements were made as part of a larger investigation to study the suitability of an area centered around the Gibson Dome structure for nuclear waste disposal. The magnitude and direction of the total electric field resulting from a current source placed in a drill hole is calculated from potential difference measurements for a grid of closely-spaced stations. A contour map of these data provides a detailed map of the distribution of the electric field away from the drill hole. Computation of the apparent resistivity from the total electric field helps to interpret the data with respect to the ideal situation of a layered earth. Repeating the surface measurements for different source depths gives an indication of variations in the geoelectric section with depth. The quantitative interpretation of the field data at Gibson Dome was hindered by the pressure of a conductive borehole fluid. However, a qualitative interpretation of the field data indicates the geoelectric section around drill hole GD-1 is not perfectly layered. The geoelectric section appears to dip to the northwest, and contains anomalies in the resistivity distribution that may be representative of localized thickening or folding of the salt layers.

  19. Formation evaluation of a horizontal well

    International Nuclear Information System (INIS)

    Najia, W.K.; Habib, K.H.; Asada, J.

    1991-01-01

    In Upper Zakum Field, the interest in horizontal drilling has continued. A second horizontal well was drilled during the second half of 1989. This necessitated running logging tools for well control and to evaluate the reservoir characteristics. The logging tool selected for this well is that of Sperry-Sun. Tools configuration and tolerance were found to fulfil SADCO's requirements and specifications. This paper reports on the services produced which included Measurement While Drilling (MWD) directional services and RLL (Recorded Lithology Logging). The RLL services cover Dual Gamma Ray (DGR), Electromagnetic Wave Resistivity (EWR) and Compensated Neutron Porosity (CN porosity). All the RLL tools were an integrated part of the Bottom Hole Drilling Assembly. Data acquired while surveying was recorded in a recording sub down-hole and retrieved when the tools were up at the surface. A PC assisted quick look interpretation was carried out using Archie's equation in shale free limestone to calculate: Effective porosity, Water Saturation and, Bulk water volume

  20. Equipment for the emplacement of heat-producing waste in long horizontal boreholes

    International Nuclear Information System (INIS)

    Young, K.D.; Scully, L.W.; Fisk, A.; deBakker, P.; Friant, J.; Anderson, A.

    1983-01-01

    Emplacement of heat-producing waste in long horizontal holes may offer several technical and economic advantages over shallow vertical hole emplacement. Less of the host rock suffers damage as a result of drift construction; the heat from the waste can be isolated from the access drifts for long periods of time; and the amount of rock which must be excavated is much less than in traditional disposal scenarios. One of the major reasons that has been used to reject the long hole concept in the past and adhere to the shallow vertical hole concept is the equipment required to drill the holes and to emplace and retrieve the waste. Such equipment does not currently exist. It clearly is more difficult to drill a 600 to 1000 foot horizontal hole, possibly 3 to 4 feet in diameter, and place a canister of waste at the end of it than to drill a 30 foot vertical hole and lower the waste to the bottom. A liner, for emplacement hole stabilization, appears to be feasible by adapting existing technology for concrete slip forming or jacking in a steel liner. The conceptual design of the equipment to drill long horizontal holes, emplace waste and retrieve waste will be discussed. Various options in concept will be presented as well as their advantages and disadvantages. The operating scenario of the selected concept will be described as well as solutions to potential problems encountered

  1. Equipment for the emplacement of heat-producing waste in long horizontal boreholes

    International Nuclear Information System (INIS)

    Young, K.D.; Fisk, A.; Friant, J.; Scully, L.W.

    1983-01-01

    Emplacement of heat-producing waste in long horizontal holes may offer several technical and economic advantages over shallow vertical hole emplacement. Less of the host rock suffers damage as a resul of drift construction; the heat from the waste can be isolated from the access drifts for long periods of time; and the amount of rock which must be excavated is much less than in traditional disposal scenarios. One of the major reasons that has been used to reject the long hole concept in the past and adhere to the shallow vertical hole concept is the equipment required to drill the holes and to emplace and retrieve the waste. Such equipment does not currently exist. It clearly is more difficult to drill a 600 to 100 foot horizontal hole, possibly 3 to 4 feet in diameter, and place a canister of waste at the end of it than to drill a 30 foot vertical hole and lower the waste to the bottom. A liner, for emplacement hole stabilization, appears to be feasible by adapting existing technology for concrete slip forming or jacking in a steel liner. The conceptual design of the equipment to drill long horizontal holes, emplace waste and retrieve waste is discussed. Various options in concept are presented as well as their advantages and disadvantages. The operating scenario of the selected concept is described as well as solutions to potential problems encountered

  2. Geology of drill hole UE25p No. 1: A test hole into pre-Tertiary rocks near Yucca Mountain, southern Nevada

    International Nuclear Information System (INIS)

    Carr, M.D.; Waddell, S.J.; Vick, G.S.; Stock, J.M.; Monsen, S.A.; Harris, A.G.; Cork, B.W.; Byers, F.M. Jr.

    1986-01-01

    Yucca Mountain in southern Nye County, Nevada, has been proposed as a potential site for the underground disposal of high-level nuclear waste. An exploratory drill hole designated UE25p No. 1 was drilled 3 km east of the proposed repository site to investigate the geology and hydrology of the rocks that underlie the Tertiary volcanic and sedimentary rock sequence forming Yucca Mountain. Silurian dolomite assigned to the Roberts Mountain and Lone Mountain Formations was intersected below the Tertiary section between a depth of approximately 1244 m (4080 ft) and the bottom of the drill hole at 1807 m (5923 ft). These formations are part of an important regional carbonate aquifer in the deep ground-water system. Tertiary units deeper than 1139 m (3733 ft) in drill hole UE25p No. 1 are stratigraphically older than any units previously penetrated by drill holes at Yucca Mountain. These units are, in ascending order, the tuff of Yucca Flat, an unnamed calcified ash-flow tuff, and a sequence of clastic deposits. The upper part of the Tertiary sequence in drill hole UE25p No. 1 is similar to that found in other drill holes at Yucca Mountain. The Tertiary sequence is in fault contact with the Silurian rocks. This fault between Tertiary and Paleozoic rocks may correlate with the Fran Ridge fault, a steeply westward-dipping fault exposed approximately 0.5 km east of the drill hole. Another fault intersects UE25p No. 1 at 873 m (2863 ft), but its surface trace is concealed beneath the valley west of the Fran Ridge fault. The Paintbrush Canyon fault, the trace of which passes less than 100 m (330 ft) east of the drilling site, intersects drill hole UE25p No. 1 at a depth of approximately 78 m (255 ft). The drill hole apparently intersected the west flank of a structural high of pre-Tertiary rocks, near the eastern edge of the Crater Flat structural depression

  3. Axially symmetrical stresses measurement in the cylindrical tube using DIC with hole-drilling

    Science.gov (United States)

    Ma, Yinji; Yao, Xuefeng; Zhang, Danwen

    2015-03-01

    In this paper, a new method combining the digital image correlation (DIC) with the hole-drilling technology to characterize the axially symmetrical stresses of the cylindrical tube is developed. First, the theoretical expressions of the axially symmetrical stresses in the cylindrical tube are derived based on the displacement or strain fields before and after hole-drilling. Second, the release of the axially symmetrical stresses for the cylindrical tube caused by hole-drilling is simulated by the finite element method (FEM), which indicates that the axially symmetrical stresses of the cylindrical tube calculated by the cylindrical solution is more accuracy than that for traditionally planar solution. Finally, both the speckle image information and the displacement field of the cylindrical tube before and after hole-drilling are extracted by combining the DIC with the hole-drilling technology, then the axially symmetrical loading induced stresses of the cylindrical tube are obtained, which agree well with the results from the strain gauge method.

  4. In situ measurement of plasma and shock wave properties inside laser-drilled metal holes

    Science.gov (United States)

    Brajdic, Mihael; Hermans, Martin; Horn, Alexander; Kelbassa, Ingomar

    2008-10-01

    High-speed imaging of shock wave and plasma dynamics is a commonly used diagnostic method for monitoring processes during laser material treatment. It is used for processes such as laser ablation, cutting, keyhole welding and drilling. Diagnosis of laser drilling is typically adopted above the material surface because lateral process monitoring with optical diagnostic methods inside the laser-drilled hole is not possible due to the hole walls. A novel method is presented to investigate plasma and shock wave properties during the laser drilling inside a confined environment such as a laser-drilled hole. With a novel sample preparation and the use of high-speed imaging combined with spectroscopy, a time and spatial resolved monitoring of plasma and shock wave dynamics is realized. Optical emission of plasma and shock waves during drilling of stainless steel with ns-pulsed laser radiation is monitored and analysed. Spatial distributions and velocities of shock waves and of plasma are determined inside the holes. Spectroscopy is accomplished during the expansion of the plasma inside the drilled hole allowing for the determination of electron densities.

  5. A self propelled drilling system for hard-rock, horizontal and coiled tube drilling

    Energy Technology Data Exchange (ETDEWEB)

    Biglin, D.; Wassell, M.

    1997-12-31

    Several advancements are needed to improve the efficiency and reliability of both hard rock drilling and extended reach drilling. This paper will present a Self Propelled Drilling System (SPDS) which can grip the borehole wall in order to provide a stable platform for the application of weight on bit (WOB) and resisting the reactive torque created by the downhole drilling motor, bit and formation interaction. The system will also dampen the damaging effects of drill string vibration. This tool employs two hydraulically activated anchors (front and rear) to grip the borehole wall, and a two-way thrust mandrel to apply both the drilling force to the bit, and a retraction force to pull the drill string into the hole. Forward drilling motion will commence by sequencing the anchor pistons and thrust mandrel to allow the tool to walk in a stepping motion. The SPDS has a microprocessor to control valve timing, sensing and communication functions. An optional Measurement While Drilling (MWD) interface can provide two-way communication of critical operating parameters such as hydraulic pressure and piston location. This information can then be telemetered to the surface, or used downhole to autonomously control system parameters such as anchor and thrust force or damping characteristics.

  6. Borehole Plugging Program. Plugging of ERDA No. 10 drill hole

    International Nuclear Information System (INIS)

    Gulick, C.W. Jr.

    1979-06-01

    A requirement exists to plug exploratory drill holes located in the proposed Waste Isolation Pilot Plant area of Southeastern New Mexico. Sandia Laboratories, in cooperation with the US Army Corps of Engineers, Waterways Experiment Station, Concrete Laboratory, developed pumpable and durable cement grouts. These grouts were successfully used to plug an existing drill hole in the area. Results of this project are presented, along with comments and conclusions

  7. Maximizing productivity of horizontal drilling and completion techniques

    Energy Technology Data Exchange (ETDEWEB)

    Schein, G. [BJ Services Company, Calgary, AB (Canada)

    2007-07-01

    There are currently 160 active drilling rigs in the Barnett shale play, and small early developments have now become large-scale operations. This presentation outlined methods currently used to improve the productivity of directional drilling and completion techniques in gas shale plays. Horizontal completions are used to control height growth and increase contact areas. A typical horizontal well casing program was described along with details of cement liner treatment programs. Charts of optimum and non-optimum azimuth wells were included. Increased reservoir contact has been achieved by using limited-entry designs and acid stages with ball-sealers and abrasive jet-cutters. Pump rates have been increased during various stages, and larger fluid and sand volumes were used. A mineralogy comparison was provided, as well as details of the general design criteria for vertical wells in the region. It was concluded that drilling in the Barnett shale play has been successful as a result of using 3-dimensional seismic mapping as well as by initiating multiple, simultaneous fracs. The presentation also included charts of the Arkoma-Woodford play, the Arkoma-Fayetteville play, and the Delaware Basin. tabs., figs.

  8. Enhancing down-the-hole air hammer capacity in directional drilling

    Science.gov (United States)

    Klishin, V. I.; Timonin, V. V.; Kokoulin, D. I.; Alekseev, S. E.; Kubanychbek, B.

    2017-09-01

    The authors discuss the issue connected with drilling trajectory deviation and present the technique of rotary-percussion drilling with a down-the-hole air hammer. The article describes pilot testing of the air hammer drill PNB76 in Berezovskaya Mine. The ways of improving the air hammer drill are identified, and the basic diagram and R&D test data are given.

  9. Emplacement hole drill evaluation and specification study. Volume I

    International Nuclear Information System (INIS)

    1977-01-01

    Results of a conceptual design program are presented for mine floor drilling in preparation for radioactive waste disposal. Two classes of drills can be used to drill emplacement holes in salt. Both are sufficiently rugged and reliable. Raise borers have a higher capital cost and require more modifications, but are more flexible in other applications and require less labor. The life cycle cost for the raise borers and for the auger rigs are about the same, while the life cycle costs of bucket drills are much higher. As long as the hole is 36 inches in diameter or less and 40 feet deep or less in salt, then the auger rig is recommended because of the lower capital cost and lower operating cost. This recommended system represents what is thought to be the best combination of available drill components assembled into a drill rig which will provide at least adequate performance. Furthermore, this drill system can be procured from at least three manufacturers. If the facility criteria change significantly, however, then the drill rig recommendations will have to be reassessed on the merits of the changes. The drill rig manufacturers can be quite flexible in combining components provided the buyer is willing to accept components with which the manufacturer has had experience. If this condition can be met, then most drill rig manufacturers will include the associated design cost as part of the drill cost. If special components are required, however, then the number of manufacturers willing to participate in a procurement may be severely reduced

  10. Real-time depth measurement for micro-holes drilled by lasers

    Science.gov (United States)

    Lin, Cheng-Hsiang; Powell, Rock A.; Jiang, Lan; Xiao, Hai; Chen, Shean-Jen; Tsai, Hai-Lung

    2010-02-01

    An optical system based on the confocal principle has been developed for real-time precision measurements of the depth of micro-holes during the laser drilling process. The capability of the measuring system is theoretically predicted by the Gaussian lens formula and experimentally validated to achieve a sensitivity of 0.5 µm. A nanosecond laser system was used to drill holes, and the hole depths were measured by the proposed measuring system and by the cut-and-polish method. The differences between these two measurements are found to be 5.0% for hole depths on the order of tens of microns and 11.2% for hundreds of microns. The discrepancies are caused mainly by the roughness of the bottom surface of the hole and by the existence of debris in the hole. This system can be easily implemented in a laser workstation for the fabrication of 3D microstructures.

  11. Lithology and Stratigraphy of Holes Drilled in LANL-Use Areas of the Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Lance B. Prothro; Sigmund L. Drellack, Jr.; Brian M. Allen

    1999-07-01

    Geologic data for ten holes drilled in areas used by Los Alamos National Laboratory at the Nevada Test Site are presented in this report. The holes include emplacement holes, instrumentation holes, and Underground Test Area wells drilled during calendar years 1991 through 1995. For each hole a stratigraphic log, a detailed lithologic log, and one or two geologic cross sections are presented, along with a supplemental data sheet containing information about the drilling operations, geology, or references. For three of the holes, graphic data summary sheets with geologic and geophysical data are provided as plates.

  12. Project for Offshore Horizontal Directional Drilling (HDD for Pipeline Crossing in Bukit Tua, Indonesia

    Directory of Open Access Journals (Sweden)

    Yusuf Sofyan

    2016-09-01

    Full Text Available Horizontal Directional Drilling (HDD is commonly associated with well exploration activity, onshore road crossing, nearshore pipeline installation, and offshore pipeline crossing which requires precise alignment of two barges from one to the other. Here, the purpose of this study was to show one of the projects that was successfully performed on December 2013 for the Bukit Tua Project in East Java, Indonesia costing USD 8 Million. From this project experience, there are 6 Best Practices in HDD Offshore Project for Pipeline Crossing Application (first in region which will serve as a guide to future projects in replicating similar success. Out from 6 Best practices, there are two main recipes for success of HDD offshore for offshore crossings which are the drilling fluid also known as mud, and the Gyro Steering Tool (GST. First, mud parameter varies on case by case basis depending on the soil condition at the location where HDD will be performed. Failure to maintain the above parameters may result in catastrophic failure whereby the bore hole may collapse and pipe may get stuck underneath the seabed. Secondly, the beauty of GST is extremely accurate and unaffected by other metal anomalies during drilling process, thus ensuring the curve profile and direction of drilling are as per design throughout the whole process.

  13. Fracture coatings in Topopah Spring Tuff along drill hole wash

    International Nuclear Information System (INIS)

    Carlos, B.A.; Chipera, S.J.; Bish, D.L.

    1994-01-01

    Fracture-lining minerals are being studied as part of site characterization to determine the suitability of Yucca Mountain, Nevada as a potential high level nuclear waste repository. Fracture coatings in the Paintbrush Group provide information on potential flow paths above the water table both toward and away from the potential repository and provide information on the distribution of fracture-lining minerals needed to model thermal effects of waste emplacement. Fracture coatings within the predominantly non-zeolitic Paintbrush Group vary both with depth and laterally across Yucca Mountain, whereas fracture coatings in tuffs below the Paintbrush Group are related to the mineralogy of the tuffs and follow a consistent pattern of distribution with predominantly quartz, calcite, and manganese oxides in the devitrified intervals and mordenite and clinoptilolite in the zeolitic intervals. The zeolites stellerite and heulandite are more abundant in fractures in the Topopah Spring Tuff in drill holes USW G-1 and UE-25 a number-sign l, located along Drill Hole Wash (at the northern end of Yucca Mountain) than in core from other parts of Yucca Mountain. Buesch et al. (2) present evidence for a complex fault system along Drill Hole Wash. To investigate the possibility that the abundant fracture-lining zeolites in USW G-1 and UE-25 a number-sign 1 are related to the Drill Hole Wash fault, the Topopah Spring Tuff was examined in drill cores from USW UZ-14, USW G-1, USW NRG-7/7a, and UE-25 a number-sign l

  14. Residual stress measurement of PMMA by combining drilling-hole with digital speckle correlation method

    Science.gov (United States)

    Yao, X. F.; Xiong, T. C.; Xu, H. M.; Wan, J. P.; Long, G. R.

    2008-11-01

    The residual stresses of the PMMA (polymethyl methacrylate) specimens after being drilled, reamed and polished respectively are investigated using the digital speckle correlation experimental method,. According to the displacement fields around the correlated calculated region, the polynomial curve fitting method is used to obtain the continuous displacement fields, and the strain fields can be obtained from the derivative of the displacement fields. Considering the constitutive equation of the material, the expression of the residual stress can be presented. During the data processing, according to the fitting effect of the data, the calculation region of the correlated speckles and the degree of the polynomial fitting curve is decided. These results show that the maximum stress is at the hole-wall of the drilling hole specimen and with the increasing of the diameter of the drilled hole, the residual stress resulting from the hole drilling increases, whereas the process of reaming and polishing hole can reduce the residual stress. The relative large discrete degree of the residual stress is due to the chip removal ability of the drill bit, the cutting feed of the drill and other various reasons.

  15. Drilling and associated drillhole measurements of the pilot hole ONK-PH11

    International Nuclear Information System (INIS)

    Karttunen, P.; Mancini, P.; Pekkanen, J.; Poellaenen, J.; Tarvainen, A.-M.; Toropainen, V.; Pere, T.

    2011-01-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH11 was drilled from chainage 3922 to chainage 4053 in October 2009. The length of the hole is 131.21 metres. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Hydraulic conductivity of the fractures or fractured zones was measured by Posiva Flow Log equipment. During flow measurements also electric conductivity and temperature were measured. In flow logging test sections of 0.5 m and increments of 0.1 m were used. The water loss measurements were performed after drilling was completed by the drilling company. Logging of the core samples included the following parameters: lithology, foliation, fracturing, RQD, fractured zones, weathering and possible intersections. The rock mechanical logging was based on Q-classification. The rock strength and deformation were determined with Rock Tester -equipment. Geophysical logging and optical imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. The groundwater samples were collected from the open hole without any packers. The collected groundwater samples were

  16. The experimental research on electrodischarge drilling of high aspect ratio holes in Inconel 718

    Science.gov (United States)

    Lipiec, Piotr; Machno, Magdalena; Skoczypiec, Sebastian

    2018-05-01

    In recent years the drilling operations become important area of electrodischarge machining (EDM) application. This especially concerns drilling of, small (D 10) holes in difficult-to-cut materials (i.e. nickel or titanium alloys). Drilling of such a holes is significantly beyond mechanical drilling capabilities. Therefore electrodischarge machining is good and cost efficient alternative for such application. EDM gives possibility to drill accurate, burr free and high aspect ratio holes and is applicable to machine wide range of conductive materials, irrespective of their hardness and toughness. However it is worth to underline its main disadvantages such as: significant tool wear, low material removal rate and poor surface integrity. The last one is especially important in reliable applications in aircraft or medical industry.

  17. Status Report A Review of Slimhole Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zhu, Tao; Carroll, Herbert B.

    1994-09-01

    This 1994 report reviews the various applications of slimhole technology including for exploration in remote areas, low-cost development wells, reentering existing wells, and horizontal and multilateral drilling. Advantages of slimholes to regular holes are presented. Limitations and disadvantages of slimholes are also discussed. In 1994, slimhole drilling was still an ongoing development technology. (DJE 2005)

  18. Use of Cutting-Edge Horizontal and Underbalanced Drilling Technologies and Subsurface Seismic Techniques to Explore, Drill and Produce Reservoired Oil and Gas from the Fractured Monterey Below 10,000 ft in the Santa Maria Basin of California

    Energy Technology Data Exchange (ETDEWEB)

    George Witter; Robert Knoll; William Rehm; Thomas Williams

    2006-06-30

    This project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of California by employing horizontal wellbores and underbalanced drilling technologies. Two vertical wells were previously drilled in this area with heavy mud and conventional completions; neither was commercially productive. A new well was drilled by the project team in 2004 with the objective of accessing an extended length of oil-bearing, high-resistivity Monterey shale via a horizontal wellbore, while implementing managed-pressure drilling (MPD) techniques to avoid formation damage. Initial project meetings were conducted in October 2003. The team confirmed that the demonstration well would be completed open-hole to minimize productivity impairment. Following an overview of the geologic setting and local field experience, critical aspects of the application were identified. At the pre-spud meeting in January 2004, the final well design was confirmed and the well programming/service company requirements assigned. Various design elements were reduced in scope due to significant budgetary constraints. Major alterations to the original plan included: (1) a VSP seismic survey was delayed to a later phase; (2) a new (larger) surface hole would be drilled rather than re-enter an existing well; (3) a 7-in. liner would be placed into the top of the Monterey target as quickly as possible to avoid problems with hole stability; (4) evaluation activities were reduced in scope; (5) geosteering observations for fracture access would be deduced from penetration rate, cuttings description and hydrocarbon in-flow; and (6) rather than use nitrogen, a novel air-injection MPD system was to be implemented. Drilling operations, delayed from the original schedule by capital constraints and lack of rig availability, were conducted from September 12 to November 11, 2004. The vertical and upper curved sections were

  19. Horizontal directional drilling: a green and sustainable technology for site remediation.

    Science.gov (United States)

    Lubrecht, Michael D

    2012-03-06

    Sustainability has become an important factor in the selection of remedies to clean up contaminated sites. Horizontal directional drilling (HDD) is a relatively new drilling technology that has been successfully adapted to site remediation. In addition to the benefits that HDD provides for the logistics of site cleanup, it also delivers sustainability advantages, compared to alternative construction methods.

  20. Drilling and associated drillhole measurements of the pilot hole ONK-PH9

    International Nuclear Information System (INIS)

    Karttunen, P.; Pekkanen, J.; Poellaenen, J.; Tarvainen, A.-M.; Toropainen, V.; Lamminmaeki, T.; Kosunen, P.

    2010-01-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH9 was drilled from chainage 3263 to chainage 3413.27 in November 2008. The length of the hole is 150.3 metres. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Hydraulic conductivity of the fractures or fractured zones was measured by Posiva Flow Log equipment. The measurements were done in two phases. During flow measurements also electric conductivity, grounding resistance and temperature were measured. In flow logging test sections of 0.5 m and increments of 0.1 m were used. The water loss measurements were performed after drilling was completed by the drilling company. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss, and weathering. The rock mechanical logging was based on Q-classification. The rock strength and deformation were determined with Rock Tester equipment. Geophysical logging and optical imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. One of the objectives of the geochemical study

  1. Use of Cutting-Edge Horizontal and Underbalanced Drilling Technologies and Subsurface Seismic Techniques to Explore, Drill and Produce Reservoired Oil and Gas from the Fractured Monterey Below 10,000 ft in the Santa Maria Basin of California

    Energy Technology Data Exchange (ETDEWEB)

    George Witter; Robert Knoll; William Rehm; Thomas Williams

    2005-09-29

    This project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of California by employing horizontal wellbores and underbalanced drilling technologies. Two vertical wells were previously drilled in this area with heavy mud and conventional completions; neither was commercially productive. A new well was drilled by the project team in 2004 with the objective of accessing an extended length of oil-bearing, high-resistivity Monterey shale via a horizontal wellbore, while implementing managed-pressure drilling (MPD) techniques to avoid formation damage. Initial project meetings were conducted in October 2003. The team confirmed that the demonstration well would be completed open-hole to minimize productivity impairment. Following an overview of the geologic setting and local field experience, critical aspects of the application were identified. At the pre-spud meeting in January 2004, the final well design was confirmed and the well programming/service company requirements assigned. Various design elements were reduced in scope due to significant budgetary constraints. Major alterations to the original plan included: (1) a VSP seismic survey was delayed to a later phase; (2) a new (larger) surface hole would be drilled rather than re-enter an existing well; (3) a 7-in. liner would be placed into the top of the Monterey target as quickly as possible to avoid problems with hole stability; (4) evaluation activities were reduced in scope; (5) geosteering observations for fracture access would be deduced from penetration rate, cuttings description and hydrocarbon in-flow; and (6) rather than use nitrogen, a novel air-injection MPD system was to be implemented. Drilling operations, delayed from the original schedule by capital constraints and lack of rig availability, were conducted from September 12 to November 11, 2004. The vertical and upper curved sections were

  2. Arthroscopically assisted stabilization of acute high-grade acromioclavicular joint separations in a coracoclavicular Double-TightRope technique: V-shaped versus parallel drill hole orientation.

    Science.gov (United States)

    Kraus, Natascha; Haas, Norbert P; Scheibel, Markus; Gerhardt, Christian

    2013-10-01

    The arthroscopically assisted Double-TightRope technique has recently been reported to yield good to excellent clinical results in the treatment of acute, high-grade acromioclavicular dislocation. However, the orientation of the transclavicular-transcoracoidal drill holes remains a matter of debate. A V-shaped drill hole orientation leads to better clinical and radiologic results and provides a higher vertical and horizontal stability compared to parallel drill hole placement. This was a cohort study; level of evidence, 2b. Two groups of patients with acute high-grade acromioclavicular joint instability (Rockwood type V) were included in this prospective, non-randomized cohort study. 15 patients (1 female/14 male) with a mean age of 37.7 (18-66) years were treated with a Double-TightRope technique using a V-shaped orientation of the drill holes (group 1). 13 patients (1 female/12 male) with a mean age of 40.9 (21-59) years were treated with a Double-TightRope technique with a parallel drill hole placement (group 2). After 2 years, the final evaluation consisted of a complete physical examination of both shoulders, evaluation of the Subjective Shoulder Value (SSV), Constant Score (CS), Taft Score (TF) and Acromioclavicular Joint Instability Score (ACJI) as well as a radiologic examination including bilateral anteroposterior stress views and bilateral Alexander views. After a mean follow-up of 2 years, all patients were free of shoulder pain at rest and during daily activities. Range of motion did not differ significantly between both groups (p > 0.05). Patients in group 1 reached on average 92.4 points in the CS, 96.2 % in the SSV, 10.5 points in the TF and 75.9 points in the ACJI. Patients in group 2 scored 90.5 points in the CS, 93.9 % in the SSV, 10.5 points in the TF and 84.5 points in the ACJI (p > 0.05). Radiographically, the coracoclavicular distance was found to be 13.9 mm (group 1) and 13.4 mm (group 2) on the affected side and 9.3 mm (group 1

  3. Standard test method for determining residual stresses by the hole-drilling strain-gage method

    CERN Document Server

    American Society for Testing and Materials. Philadelphia

    2008-01-01

    1.1 Residual Stress Determination: 1.1.1 This test method specifies a hole-drilling procedure for determining residual stress profiles near the surface of an isotropic linearly elastic material. The test method is applicable to residual stress profile determinations where in-plane stress gradients are small. The stresses may remain approximately constant with depth (“uniform” stresses) or they may vary significantly with depth (“non-uniform” stresses). The measured workpiece may be “thin” with thickness much less than the diameter of the drilled hole or “thick” with thickness much greater than the diameter of the drilled hole. Only uniform stress measurements are specified for thin workpieces, while both uniform and non-uniform stress measurements are specified for thick workpieces. 1.2 Stress Measurement Range: 1.2.1 The hole-drilling method can identify in-plane residual stresses near the measured surface of the workpiece material. The method gives localized measurements that indicate the...

  4. Well completion report on installation of horizontal wells for in-situ remediation tests

    International Nuclear Information System (INIS)

    Kaback, D.S.; Looney, B.B.; Corey, J.C.; Wright, L.M.

    1989-08-01

    A project to drill and install two horizontal vapor extraction/air-injection wells at the Savannah River Site (SRS), Aiken, South Carolina, was performed in September and October of 1988. This study was performed to test the feasibility of horizontal drilling technologies in unconsolidated sediments and to evaluate the effectiveness of in-situ air stripping of volatile organics from the ground water and unsaturated soils. A tremendous amount of knowledge was obtained during the drilling and installation of the two test wells. Factors of importance to be considered during design of another horizontal well drilling program follow. (1) Trips in and out of the borehole should be minimized to maintain hole stability. No reaming to enlarge the hole should be attempted. (2) Drilling fluid performance should be maximized by utilizing a low solids, low weight, moderate viscosity, high lubricity fluid. Interruption of drilling fluid circulation should be minimized. (3) Well materials should possess adequate flexibility to negotiate the curve. A flexible guide should be attached to the front of the well screen to guide the screen downhole. (4) Sands containing a minor amount of clay are recommended for completion targets, as better drilling control in the laterals was obtained in these sections

  5. The relationship of cutting force with hole quality in drilling process of AISI H13 steel

    Directory of Open Access Journals (Sweden)

    Tekaüt İsmail

    2017-01-01

    Full Text Available The harmony of the drilling machine-cutting tool-work piece is very important for producing the machine part with the ideal dimensions. For this purpose in this study, the effect of cutting forces on hole quality (surface roughness, diameter deviation and circular deviation was investigated by 14 mm diameter uncoated and (AlCrN monolayer coated carbide drills for drilling AISI H13 hot work tool steel on vertical machining center. Four different cutting speeds (60, 75, 90 and 108 m / min and three different feed rates (0.15, 0.20 and 0.25 mm / rev were used in the experiments. Cutting forces have been found to be effective in improving hole quality. Better hole quality has obtained with coated drills than uncoated drills in experiments. It has been observed that coated drills have the effect of improving the hole quality due to the operation with less cutting force and better chip evacuation.

  6. Applicability of petroleum horizontal drilling technology to hazardous waste site characterization and remediation

    International Nuclear Information System (INIS)

    Goranson, C.

    1992-09-01

    Horizontal wells have the potential to become an important tool for use in characterization, remediation and monitoring operations at hazardous waste disposal, chemical manufacturing, refining and other sites where subsurface pollution may develop from operations or spills. Subsurface pollution of groundwater aquifers can occur at these sites by leakage of surface disposal ponds, surface storage tanks, underground storage tanks (UST), subsurface pipelines or leakage from surface operations. Characterization and remediation of aquifers at or near these sites requires drilling operations that are typically shallow, less than 500-feet in depth. Due to the shallow nature of polluted aquifers, waste site subsurface geologic formations frequently consist of unconsolidated materials. Fractured, jointed and/or layered high compressive strength formations or compacted caliche type formations can also be encountered. Some formations are unsaturated and have pore spaces that are only partially filled with water. Completely saturated underpressured aquifers may be encountered in areas where the static ground water levels are well below the ground surface. Each of these subsurface conditions can complicate the drilling and completion of wells needed for monitoring, characterization and remediation activities. This report describes some of the equipment that is available from petroleum drilling operations that has direct application to groundwater characterization and remediation activities. A brief discussion of petroleum directional and horizontal well drilling methodologies is given to allow the reader to gain an understanding of the equipment needed to drill and complete horizontal wells. Equipment used in river crossing drilling technology is also discussed. The final portion of this report is a description of the drilling equipment available and how it can be applied to groundwater characterization and remediation activities

  7. Drilling and associated drillhole measurements of the pilot hole ONK-PH10

    International Nuclear Information System (INIS)

    Mancini, P.; Karttunen, P.; Lokkila, M.; Pekkanen, J.; Poellaenen, J.; Tarvainen, A.-M.; Toropainen, V.; Kosunen, P.; Pere, T.

    2010-08-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH10 was drilled from chainage 3459 to chainage 3639 in March 2009. The length of the hole is 180.00 metres. The drilling was done as orientated core drilling. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss, and weathering. The rock mechanical logging was based on Q-classification. The test to determine rock strength and deformation were made with Rock Tester -equipment. Water conductivity of the fractures or fractured zones was measured by Posiva Flow Log equipment. The measurements were done in two phases. During flow measurements also grounding resistance electric conductivity and temperature were measured. In flow logging test, sections of 0.5 m with increments of 0.1 m were used. Water loss measurements were conducted in the hole section 3.70-180.00 m dhd. Geophysical logging and optical imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. One of the objectives of the geochemical study was to get information of the composition of

  8. Geological-geotechnical investigation for large horizontal directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Martins, Pedro R.R.; Rocha, Ronaldo; Avesani Neto, Jose Orlando; Placido, Rafael R.; Ignatius, Scandar G.; Galli, Vicente Luiz [Instituto de Pesquisas Tecnologicas do Estado de Sao Paulo (IPT), Sao Paulo, SP (Brazil); Amaral, Claudio S. [Centro de Pesquisa Leopoldo A. Miguez de Melo (CENPES/PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    Use of Horizontal Directional Drilling - HDD for large diameter (OD>20 inches) pipeline installation started in the second half of the seventies. Since then the method became the preferred alternative for situations in which it is necessary an underground pipeline but there are concerns about digging trenches. Crossings of roadways, water bodies and environmental sensitive areas are typical examples of its application. Technical and economic feasibility of HDD depends significantly on the properties of the materials that will be drilled. Lack of information about these materials can lead to several problems as: schedule delays, cost elevation, pipeline damage, unforeseen environmental impacts and even the failure of the entire operation. Ground investigation campaigns for HDD should define a consistent geological-geotechnical model, which must include determination of behaviour parameters for soil and rock masses that will be drilled. Thus it is proposed an investigation in tree stages: review of available geological-geotechnical information, site reconnaissance, and field survey. (author)

  9. Drilling and associated Drillhole measurements of the Pilot Hole ONK-PH14

    International Nuclear Information System (INIS)

    Aalto, P.; Toropainen, V.; Tarvainen, A.-M.; Pekkanen, J.; Poellaenen, J.; Lamminmaeki, T.

    2011-09-01

    The construction of ONKALO access tunnel started in September 2004 at Olkiluoto. During the construction, investigations serving both research and construction purposes need to be done. Investigations can be done for example in so called pilot holes. Pilot holes are cored drillholes to be drilled to the tunnel profile. The length of the holes varies from some tens of metres to some hundreds of metres. The purpose of the holes is to confirm the quality of the rock mass for tunnel construction, especially to identify water conductive fractures/fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH14 was drilled in June 2010. Drilling was started in chainage 4313.6. The length of the hole was 150.80 metres. The deviation of the drillhole was measured during and after the drilling. Additionally, oriented core samples were collected from the drill core and the electric conductivity of returning water was measured. Logging of the core samples included following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The strength and deformation properties of the rock were defined by using Rock-Tester equipment. Hydraulic measurements were made by using the PFL DIFF (Posiva Flow log, Difference Flow Method). PFL DIFF measurements were performed with a 0.5 m section length and with 0.1 m length increments. With PFL DIFF tool the locations of transmissive fractures were detected. Simultaneously, the electric conductivity (EC) of the drillhole water and fracture specific water, temperature of the drillhole water, single point resistance (SPR) of the drillhole wall and the prevailing water pressure were measured. Water loss measurements were done after the drilling by the tool developed by Posiva. The tool was in test use during the measurements. The groundwater sample was

  10. Drilling and associated Drillhole measurements of the Pilot Hole ONK-PH14

    Energy Technology Data Exchange (ETDEWEB)

    Aalto, P. (ed.); Lahti, M.; Kosunen, P.; Pere, T. [Posiva Oy, Helsinki (Finland); Toropainen, V.; Tarvainen, A.-M. [Suomen Malmi Oy, Espoo (Finland); Pekkanen, J.; Poellaenen, J. [Poeyry Finland Oy, Espoo (Finland); Lamminmaeki, T. [Teollisuuden Voima Oyj, Helsinki (Finland)

    2011-08-15

    The construction of ONKALO access tunnel started in September 2004 at Olkiluoto. During the construction, investigations serving both research and construction purposes need to be done. Investigations can be done for example in so called pilot holes. Pilot holes are cored drillholes to be drilled to the tunnel profile. The length of the holes varies from some tens of metres to some hundreds of metres. The purpose of the holes is to confirm the quality of the rock mass for tunnel construction, especially to identify water conductive fractures/fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH14 was drilled in June 2010. Drilling was started in chainage 4313.6. The length of the hole was 150.80 metres. The deviation of the drillhole was measured during and after the drilling. Additionally, oriented core samples were collected from the drill core and the electric conductivity of returning water was measured. Logging of the core samples included following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The strength and deformation properties of the rock were defined by using Rock-Tester equipment. Hydraulic measurements were made by using the PFL DIFF (Posiva Flow log, Difference Flow Method). PFL DIFF measurements were performed with a 0.5 m section length and with 0.1 m length increments. With PFL DIFF tool the locations of transmissive fractures were detected. Simultaneously, the electric conductivity (EC) of the drillhole water and fracture specific water, temperature of the drillhole water, single point resistance (SPR) of the drillhole wall and the prevailing water pressure were measured. Water loss measurements were done after the drilling by the tool developed by Posiva. The tool was in test use during the measurements. The groundwater sample was

  11. Transportal femoral drilling creates more horizontal ACL graft orientation compared to transtibial drilling: A 3D CT imaging study.

    Science.gov (United States)

    Clockaerts, S; Van Haver, A; Verhaegen, J; Vuylsteke, K; Leenders, T; Lagae, K C; Verdonk, P

    2016-06-01

    The principle of anatomic anterior cruciate ligament (ACL) reconstruction is to create a femoral and tibial tunnel that resembles the insertion of the native ACL. Anatomic reconstruction leads to a more horizontal graft orientation that provides more rotational stability. The aim of this study is to investigate the best method to achieve anatomical reconstruction of femoral insertion of the ACL and thus, a more horizontal orientation of the ACL. We compared tunnel position and orientation between transportal femoral drilling technique and transtibial technique. Thirty-two patients were included. Post-operative CT scans were obtained and femur, tibia and ACL tunnels were reconstructed. The position and orientation of tibial and femoral tunnels were quantified using the quadrant method, and femoral tunnel length, ellipticity and posterior wall breakage were assessed. We also investigated clinical outcome. Analyses show that transportal drilled femoral tunnels were situated significantly lower than transtibial drilled tunnels (p<0.0001), resulting in a significantly more horizontal oriented ACL in the transportal group in coronal (p<0.0001) and sagittal plane (p=0.01). No differences were observed in depth of femoral tunnel position (p=0.44). Femoral tunnel length was shorter in the transportal group (p=0.01) with a more ellipsoidal femoral aperture (p=0.01). There were no differences between both groups in tibial position. There were no differences in clinical outcome measure between the transportal and transtibial groups. This study indicates that transportal drilling of the femoral tunnel leads to a more horizontal graft orientation of the ACL, without differences in clinical outcome. Copyright © 2016 Elsevier B.V. All rights reserved.

  12. Geology of hole drill thermal infra basaltic (Guarani Aquifer System) in Salto Uruguay

    International Nuclear Information System (INIS)

    Goso, C.; Muzio, R.; Marmisolle, J.; De Souza, S.

    2004-01-01

    This paper deals with the lithological description of a thermal infrabasaltic (Guarani Aquifer System) hole drill cutting in Dayman (Kanarek Hotel), Salto department (Uruguay). This hole drill shows 152 meters of Buena Vista Formation (Upper Permian- Lower Triassic), 188 meters of Tacuarembo Formation (Upper Jurassic-Lower Cretaceous) and 940meters of Arapey Formation (Lower Cretaceous). Petrographical studies of six basaltic levels were done [es

  13. Editorial Commentary: The Larger Holes or Larger Number of Holes We Drill in the Coracoid, the Weaker the Coracoid Becomes.

    Science.gov (United States)

    Brady, Paul

    2016-06-01

    The larger holes or larger number of holes we drill in the coracoid, the weaker the coracoid becomes. Thus, minimizing bone holes (both size and number) is required to lower risk of coracoid process fracture, in patients in whom transosseous shoulder acromioclavicular joint reconstruction is indicated. A single 2.4-mm-diameter tunnel drilled through both the clavicle and the coracoid lowers the risk of fracture, but the risk cannot be entirely eliminated. Copyright © 2016 Arthroscopy Association of North America. Published by Elsevier Inc. All rights reserved.

  14. Horizontal Directional Drilling-Length Detection Technology While Drilling Based on Bi-Electro-Magnetic Sensing

    Directory of Open Access Journals (Sweden)

    Yudan Wang

    2017-04-01

    Full Text Available The drilling length is an important parameter in the process of horizontal directional drilling (HDD exploration and recovery, but there has been a lack of accurate, automatically obtained statistics regarding this parameter. Herein, a technique for real-time HDD length detection and a management system based on the electromagnetic detection method with a microprocessor and two magnetoresistive sensors employing the software LabVIEW are proposed. The basic principle is to detect the change in the magnetic-field strength near a current coil while the drill stem and drill-stem joint successively pass through the current coil forward or backward. The detection system consists of a hardware subsystem and a software subsystem. The hardware subsystem employs a single-chip microprocessor as the main controller. A current coil is installed in front of the clamping unit, and two magneto resistive sensors are installed on the sides of the coil symmetrically and perpendicular to the direction of movement of the drill pipe. Their responses are used to judge whether the drill-stem joint is passing through the clamping unit; then, the order of their responses is used to judge the movement direction. The software subsystem is composed of a visual software running on the host computer and a software running in the slave microprocessor. The host-computer software processes, displays, and saves the drilling-length data, whereas the slave microprocessor software operates the hardware system. A combined test demonstrated the feasibility of the entire drilling-length detection system.

  15. USE OF CUTTING-EDGE HORIZONTAL AND UNDERBALANCED DRILLING TECHNOLOGIES AND SUBSURFACE SEISMIC TECHNIQUES TO EXPLORE, DRILL AND PRODUCE RESERVOIRED OIL AND GAS FROM THE FRACTURED MONTEREY BELOW 10,000 FT IN THE SANTA MARIA BASIN OF CALIFORNIA

    Energy Technology Data Exchange (ETDEWEB)

    George Witter; Robert Knoll; William Rehm; Thomas Williams

    2005-02-01

    This project was undertaken to demonstrate that oil and gas can be drilled and produced safely and economically from a fractured Monterey reservoir in the Santa Maria Basin of California by employing horizontal wellbores and underbalanced drilling technologies. Two vertical wells were previously drilled in this area by Temblor Petroleum with heavy mud and conventional completions; neither was commercially productive. A new well was drilled by the project team in 2004 with the objective of accessing an extended length of oil-bearing, high-resistivity Monterey shale via a horizontal wellbore, while implementing managed-pressure drilling (MPD) techniques to avoid formation damage. Initial project meetings were conducted in October 2003. The team confirmed that the demonstration well would be completed open-hole to minimize productivity impairment. Following an overview of the geologic setting and local field experience, critical aspects of the application were identified. At the pre-spud meeting in January 2004, the final well design was confirmed and the well programming/service company requirements assigned. Various design elements were reduced in scope due to significant budgetary constraints. Major alterations to the original plan included: (1) a VSP seismic survey was delayed to a later phase; (2) a new (larger) surface hole would be drilled rather than re-enter an existing well; (3) a 7-in. liner would be placed into the top of the Monterey target as quickly as possible to avoid problems with hole stability; (4) evaluation activities were reduced in scope; (5) geosteering observations for fracture access would be deduced from penetration rate, cuttings description and hydrocarbon in-flow; and (6) rather than use nitrogen, a novel air-injection MPD system was to be implemented. Drilling operations, delayed from the original schedule by capital constraints and lack of rig availability, were conducted from September 12 to November 11, 2004. The vertical and upper

  16. Hole Drilling Technique – on site stress measurement

    OpenAIRE

    Schueremans, Luc

    2009-01-01

    2. Hole Drilling Technique for onsite stress measurement has been used to validate the stress level at 2 pillars of the Sint-Jacobschurch (Leuven, B). The technique allows estimating the stress in a stone from measuring deformation when a small hole is made. It is a low intrusive technique. The application of it is limited to local stress measurements and is a complement to stress estimate from calculations of from the use of –for example- flat jacks. In addition to the flat-jack technique...

  17. Drilling and associated drillhole measurements of the pilot hole ONK-PH13

    International Nuclear Information System (INIS)

    Tarvainen, A.-M.; Toropainen, V.; Pekkanen, J.; Poellaenen, J.; Kosunen, P.; Lahti, M.; Pere, T.; Aalto, P.

    2011-04-01

    The construction of ONKALO access tunnel started in September 2004 at Olkiluoto. During the construction, investigations serving both research and construction purposes need to be done. Investigations can be done for example in so called pilot holes. Pilot holes are cored drillholes to be drilled to the tunnel profile. The length of the holes varies from some tens of meters to some hundreds of meters. The purpose of the holes is to confirm the quality of the rock mass for tunnel construction, especially to identify water conductive fractures/fracture zones and provide information that could result in modifications of the existing construction plans. The pilot hole ONK-KR13 was drilled in March 2010. Drilling was started from chainage 4201. The final length of the hole was 140.05 meters. The deviation of the drillhole was measured during and after the drilling. Additionally, oriented core samples were collected and electric conductivity of returning water from the drill hole was measured. Logging of the core samples included following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The strength and deformation properties of the rock were defined by using Rock-Tester equipment. Hydraulic measurements were made by using the PFL DIFF (Posiva Flow Log, Difference Flow method). PFL DIFF measurements were performed with a 0.5 m section length and with 0.1 m length increments. With PFL DIFF tool the locations of flowing fractures and their transmissivities were detected. Simultaneously, the electric conductivity (EC) of the drillhole water and fracture-specific water, temperature of the drillhole water, single point resistance (SPR) of the drillhole wall and the prevailing water pressure profile were measured. Water loss measurements were done after the drilling by the tool developed by Posiva. The equipment was in test use during the measurements

  18. Effect of cooling methods on hole quality in drilling of aluminium 6061-6T

    International Nuclear Information System (INIS)

    Islam, M N; Boswell, B

    2016-01-01

    The influence of cooling method and drilling parameters on hole production has been investigated experimentally and analytically by measuring the hole quality. A three-level, three-parameter experiment was conducted using design-of-experiment methodology. The three levels of independent input parameters were: for cooling method—flood drilling, minimum quantity lubrication (MQL) drilling and cryogenic drilling; for feed rate—0.2, 0.3 and 0.4 mm/rev; and for cutting speed—60, 75 and 100 m/min. The selected work and tool materials were aluminium 6061-6T and high speed steel (HSS), respectively. The measured output parameters were the three most widely used quality characteristics of drilled holes - diameter error, circularity and surface roughness. The results were analysed applying three methods: Pareto ANOVA, Taguchi method and traditional analysis. The findings revealed that the cooling method has a significant effect on diameter error (contribution ratio 88.27%), moderate effect on surface roughness (contribution ratio 41.74%) and relatively small effect on circularity (contribution ratio 23.64%). The best results for the dimensional accuracy and surface roughness were achieved by MQL drilling. Cryogenic drilling produced the best circularity results; however, in terms of dimensional accuracy and surface roughness it was the worst. (paper)

  19. Jet impinging onto a laser drilled tapered hole: Influence of tapper location on heat transfer and skin friction at hole surface

    Science.gov (United States)

    Shuja, S. Z.; Yilbas, B. S.

    2013-02-01

    Jet emerging from a conical nozzle and impinging onto a tapered hole in relation to laser drilling is investigated and the influence taper location on the heat transfer and skin friction at the hole wall surface is examined. The study is extended to include four different gases as working fluid. The Reynolds stress model is incorporated to account for the turbulence effect in the flow field. The hole wall surface temperature is kept at 1500 K to resemble the laser drilled hole. It is found that the location of tapering in the hole influences the heat transfer rates and skin friction at the hole wall surface. The maximum skin friction coefficient increases for taper location of 0.25 H, where H is the thickness of the workpiece, while Nusselt number is higher in the hole for taper location of 0.75 H.

  20. Filter construction technology in mining drilling hole for in-situ leaching of multilayer deposit

    International Nuclear Information System (INIS)

    Jiang Yan; Hu Baishi; Tan Yahui; Yang Lizhi; Li Xiaojian; Wang Xiaodong; Chang Jingtao; Qin Hao

    2014-01-01

    Taking a typical multilayer sandstone uranium deposit as example, study was carried out on filter construction technology in mining drilling hole for in-situ leaching of multilayer deposit. According to the character of multilayer sandstone, four injecting holes and one drawning hole were designed between the P13-P15 exploration lines, five different methods were used to construct filter. Construction technology by different methods was introduced and the advantages and disadvantages of the construction filter with five methods were analysed. As far as five experimental drilling holes, layered gravel-filling hole construction technology is a suitable method for construction multilayer filter with continuous construction, simple operation and good effect of well completion. (authors)

  1. Analysis and 3D inspection system of drill holes in aeronautical surfaces

    Science.gov (United States)

    Rubio, R.; Granero, L.; Sanz, M.; García, J.; Micó, V.

    2017-06-01

    In aerospace industry, the structure of the aircraft is assembled using small parts or a combination of them that are made with different materials, such as for instance aluminium, titanium, composites or even 3D printed parts. The union between these small parts is a critical point for the integrity of the aircraft. The quality of this union will decide the fatigue of adjacent components and therefore the useful life of them. For the union process the most extended method is the rivets, mainly because their low cost and easy manufacturing. For this purpose it is necessary to made drill holes in the aeronautical surface to insert the rivets. In this contribution, we present the preliminary results of a 3D inspection system [1] for drill holes analysis in aeronautical surfaces. The system, based in optical triangulation, was developed by the Group of Optoelectronic Image Processing from the University of Valencia in the framework of the Airbus Defence and Space (AD&S), MINERVA project (Manufacturing industrial - means emerging from validated automation). The capabilities of the system permits to generate a point cloud with 3D information and GD&T (geometrical dimensions and tolerances) characteristics of the drill hole. For the inner surface defects detection, the system can generate an inner image of the drill hole with a scaled axis to obtain the defect position. In addition, we present the analysis performed for the drills in the wing station of the A-400 M. In this analysis the system was tested for diameters in the range of [10 - 15.96] mm, and for Carbon Fibre.

  2. Laser drilling of superdeep micron holes in various materials with a programmable control of laser radiation parameters

    International Nuclear Information System (INIS)

    Basiev, Tasoltan T; Osiko, Vyacheslav V; Gavrilov, A V; Smetanin, S N; Fedin, A V

    2007-01-01

    The possibilities of enhancing the efficiency of laser drilling of micron holes, increasing their depth, and eliminating their conic shape are studied by using a single-mode loop Nd:YAG laser with self-phase conjugation on the gain gratings and passive Q-switching by a scanned gradiently coloured F 2 - :LiF crystal. Holes of diameters 15-150 μm and depth up to 20 mm with the aspect ratio (ratio of the hole depth to its diameter) of 50-155 are drilled in various metals and alloys. It is shown that passive Q-switch scanning during drilling provides the increase in the depth and speed of the laser drilling of superdeep holes by a factor of 1.5-2. (laser technologies)

  3. Logging while drilling keeps horizontal well on small target

    International Nuclear Information System (INIS)

    Leake, J.; Shray, F.

    1991-01-01

    This paper reports that the logging-while-drilling (LWD) measurement to two resistivities of different characteristics had led to a new interpretation method for the analysis of horizontal wells. By logging deep and shallow resistivity in real-time, marker beds were identified to help maintain well bore trajectory. The resistivity measurements were split into vertical and horizontal components to provide additional information of formation evaluation. In 1945, Ark Fuel Co. discovered and began developing the Olla field on the crest of the La Salle arch in La Salle Parish, La. Oil production comes from the Wilcox formation from alluvial sand packages that range in thickness from 3 ft to 120 ft. Now operated by Oxy U.S.A. Inc., Olla field was chosen in 1990 for a horizontal well pilot project. It was hoped that a horizontal well could alleviate water coming in one of the field's more productive sand packages- the 40-ft Cruse sand

  4. Geology of the USW SD-9 drill hole, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Engstrom, D.A.; Rautman, C.A.

    1996-10-01

    Drill hole USW SD-9 is one of several holes drilled under Site Characterization Plan Study as part of the characterization program at Yucca Mountain, Nevada, which has been proposed as the potential location of a repository for high-level nuclear waste. The SD-9 drill hole is located in the northern part of the potential repository area. Quantitative and semiquantitative data are included in this report for cover recovery, rock-quality designation (RQD), lithophysal cavity abundance, and fracturing. These data are spatially variable, both within and among the major formational-level stratigraphic units. Nonwelded intervals in general exhibit higher recoveries and more intact (higher) RQD values than welded intervals. The most intact, highest-RQD materials encountered within the Topopah Spring belong to the lower 33.3 ft of the middle nonlithophysal zone. This report includes quantitative data for the framework material properties of porosity, bulk and particle density, and saturated hydraulic conductivity. Graphical analysis of variations in these laboratory hydrologic properties indicates first-order control of material properties by the degree of welding and the presence of zeolite minerals. Many major lithostratigraphic contacts are not well expressed in the material-property profiles; contacts of material-property units are related more to changes in the intensity of welding. Approximate in-situ saturation data of samples preserved immediately upon recovery from the hole are included in the data tabulation

  5. Geology of the USW SD-9 drill hole, Yucca Mountain, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Engstrom, D.A. [Spectra Research Inst., Albuquerque, NM (United States); Rautman, C.A. [Sandia National Labs., Albuquerque, NM (United States)

    1996-10-01

    Drill hole USW SD-9 is one of several holes drilled under Site Characterization Plan Study as part of the characterization program at Yucca Mountain, Nevada, which has been proposed as the potential location of a repository for high-level nuclear waste. The SD-9 drill hole is located in the northern part of the potential repository area. Quantitative and semiquantitative data are included in this report for cover recovery, rock-quality designation (RQD), lithophysal cavity abundance, and fracturing. These data are spatially variable, both within and among the major formational-level stratigraphic units. Nonwelded intervals in general exhibit higher recoveries and more intact (higher) RQD values than welded intervals. The most intact, highest-RQD materials encountered within the Topopah Spring belong to the lower 33.3 ft of the middle nonlithophysal zone. This report includes quantitative data for the framework material properties of porosity, bulk and particle density, and saturated hydraulic conductivity. Graphical analysis of variations in these laboratory hydrologic properties indicates first-order control of material properties by the degree of welding and the presence of zeolite minerals. Many major lithostratigraphic contacts are not well expressed in the material-property profiles; contacts of material-property units are related more to changes in the intensity of welding. Approximate in-situ saturation data of samples preserved immediately upon recovery from the hole are included in the data tabulation.

  6. Case study : environmental considerations of horizontal directional drills

    International Nuclear Information System (INIS)

    Slade, D.A.

    2000-01-01

    A pipeline construction project by Enbridge Pipelines (Toledo) Inc. which relied on horizontal directional drilling (HDD) techniques to install the pipe was analyzed with particular focus on the environmental benefits and risks of using directional drills compared to open cut installation. The construction of the 35-mile, 16-inch crude petroleum pipeline from Stockbridge to Freedom Junction in Michigan involved the use of 11 separate directional drills to cross through wetlands, streams and state recreational areas. The role that HDD played in route selection and environmental permit considerations was discussed along with some of the problems encountered with directional drilling. A successful HDD program must have adequate geotechnical information to properly design and plan the crossings. It was recommended that geotechnical borings should be conducted every 300 to 500 feet across the HDD alignment. It was also recommended that a frac-out contingency plan should be developed and to be prepared for the temporary shut down of the HDD rig if a frac-out occurs. Frac-outs must be investigated, contained and any released fluid should be removed. Some recommendations from past experiences were also presented as a guide for future planning of pipeline projects that include HDD techniques, particularly in wetland areas. Appendix A to this presentation included a contingency plan for illustrative purposes only. The plan was developed for the above project and was included as an example only. It described the planning, prevention and control measures to minimize impacts resulting from inadvertent spill of drilling mud during directional drilling in wetlands. It also included a drilling mud 'Containment, Response and Notification Plan' to be implemented as determined by the contractor under the supervision of Enbridge Pipelines (Toledo) Inc. 5 refs., 2 tabs., 1 fig., 1 appendix

  7. Geology of the UE12t No. 3 vertical drill hole, area 12, Nevada Test Site

    International Nuclear Information System (INIS)

    Terry, S.S.

    1975-11-01

    The UE12t No. 3 vertical drill hole, located near the north end of Rainier Mesa, was drilled to a total depth of 663 m (2,176 ft). The UE12t No. 3 vertical hole was drilled to further evaluate the subsurface stratigraphy northwest of the t-tunnel complex area in preparation for mining of the U12t.03 (Husky Pup) drift. The drill hole is collared in the Rainier Mesa Member of the Timber Mountain Tuff and penetrates down the stratigraphic section through the Paintbrush Tuff, the welded Grouse Canyon Member of the Belted Range Tuff, tunnel beds 5-3, the Tub Spring Member of the Belted Range Tuff, tunnel bed 2, Crater Flat Tuff, tunnel bed 1, Redrock Valley Tuff, and bottoms in older Tertiary tuffaceous and Paleozoic quartzite rubble having a partially argillized, tuffaceous, soillike matrix. The tuff of Dead Horse Flat and the bedded and ash-flow tuffs of Area 20 were not differentiated in the logging of this drill hole. Stratigraphy, structure, engineering geology, and physical properties and their relation to tunneling are discussed

  8. INTEGRATED DRILLING SYSTEM USING MUD ACTUATED DOWN HOLE HAMMER AS PRIMARY ENGINE

    Energy Technology Data Exchange (ETDEWEB)

    John V. Fernandez; David S. Pixton

    2005-12-01

    A history and project summary of the development of an integrated drilling system using a mud-actuated down-hole hammer as its primary engine are given. The summary includes laboratory test results, including atmospheric tests of component parts and simulated borehole tests of the hammer system. Several remaining technical hurdles are enumerated. A brief explanation of commercialization potential is included. The primary conclusion for this work is that a mud actuated hammer can yield substantial improvements to drilling rate in overbalanced, hard rock formations. A secondary conclusion is that the down-hole mud actuated hammer can serve to provide other useful down-hole functions including generation of high pressure mud jets, generation of seismic and sonic signals, and generation of diagnostic information based on hammer velocity profiles.

  9. Geophysical well-log measurements in three drill holes at Salt Valley, Utah

    International Nuclear Information System (INIS)

    Daniels, J.J.; Hite, R.J.; Scott, J.H.

    1980-01-01

    Three exploratory drill holes were drilled at Salt Valley, Utah, to study the geologic, physical, geochemical, and hydrologic properties of the evaporite sequence in the Permian Paradox Member of the Hermosa Formation. The results of these studies will be used to help to determine the suitability of salt deposits in the Paradox basin as a storage medium for radioactive waste material. The following geophysical well-log measurements were made in each of the three drill holes: (1) density, (2) neutron, (3) acoustic velocity, (4) normal resistivity, and (5) gamma ray. Widely spaced resistivity and conductivity well-log measurements were made in the deep drill hole. Each of these well-log measurements shows the division of the evaporite sequence into halite and interbed sections. At the present time the most useful well-logging measurements for determining the individual lithologies in an evaporite sequence are gamma ray, neutron, density, and acoustic velocity. The high resistivity contrast between the drilling fluid (0.5 ohm-m) and salt (10,000 ohm-m) makes it difficult to obtain quantitative measurements of electrical properties in an evaporite sequence. Tests of widely spaced electrode configurations show that the effects of the brine on the resistivity measurements can be reduced, and the depth of investigation increased, by increasing the source-receiver electrode spacing. Tests of a single-coil induction probe show good resolution of the contrasting electrical properties of the various interbed lithologies

  10. Drilling and associated drillhole measurements of the pilot hole ONK-PH12

    International Nuclear Information System (INIS)

    Toropainen, V.; Tarvainen, A.-M.; Poellaenen, J.; Pekkanen, J.; Pere, T.; Kaepyaho, E.; Lahti, M.

    2011-01-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH12 was drilled from ONKALO chainage 4092 to chainage 4215 in January 2010. The length of the hole is 123.96 metres. The drilling method was orientated core drilling. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss, and weathering. The rock mechanical logging was based on Q-classification. The test to determine rock strength and deformation were made with Rock Tester -equipment. Water conductivity of the fractures or fractured zones was measured by Posiva Flow Log equipment. The measurements were done in two phases. During flow measurements also grounding resistance electric conductivity and temperature were measured. In flow logging test, sections of 0.5 m with increments of 0.1 m were used. Water loss measurements were conducted in the drillhole section 5.0-123.85 m dhd. Geophysical logging as well as optical and acoustic imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. Groundwater sampling was not applicable because no

  11. Drilling and the associated drillhole measurements of the pilot hole ONK-PH7

    International Nuclear Information System (INIS)

    Oehberg, A.; Kemppainen, K.; Lampinen, H.; Niemonen, J.; Poelloenen, J.; Rouhiainen, P.; Rautio, T.; Tarvainen, A.-M.

    2007-12-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH7 was drilled from chainage 1880 to chainage 1980.31 in February 2007. The length of the hole is 100.31 m. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Difference Flow method was used for the determination of hydraulic conductivity in fractures and fractured zones in the drillhole. The overlapping i.e. the detailed flow logging mode was used. Besides flow logging Single Point Resistance (SPR), Electric Conductivity (EC) and temperature of the drillhole water were also measured. The flow logging was performed with 0.5 m section length and with 0.1 m depth increment. Water loss measurements were conducted between the hole depth of 1.18 m and the hole bottom. Geophysical logging and optical imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as

  12. Thermal stress measurement in continuous welded rails using the hole-drilling method

    Science.gov (United States)

    Zhu, Xuan; Lanza di Scalea, Francesco; Fateh, Mahmood

    2016-04-01

    The absence of expansion joints in Continuous Welded Rail (CWR) has created the need for the railroad industry to determine the in-situ level of thermal stresses so as to prevent train accidents caused by rail buckling in hot weather and by rail breakage in cold weather. The development of non-destructive or semi-destructive methods for determining the level of thermal stresses in rails is today a high research priority. This study explores the known hole-drilling method as a possible solution to this problem. A new set of calibration coefficients to compute the relieved stress field with the finer hole depth increments was determined by a 3D Finite Element Analysis that modeled the entire hole geometry, including the mechanics of the hole bottom and walls. To compensate the residual stress components, a linear relationship was experimentally established between the longitudinal and the vertical residual stresses of two common sizes of rails, the 136RE and the 141RE, with statistical significance. This result was then utilized to isolate the longitudinal thermal stress component in hole-drilling tests conducted on the 136RE and 141RE thermally-loaded rails at the Large-scale CWR Test-bed of UCSD's Powell Research Laboratories. The results from the Test-bed showed that the hole-drilling procedure, with the appropriate residual stress compensation, can indeed estimate the in-situ thermal stresses to achieve a +/-5°F accuracy of Neutral Temperature determination with a 90% statistical confidence, which is the desired industry gold standard.

  13. Selected stratigraphic data for drill holes located in Frenchman Flat, Nevada Test Site. Rev. 1

    International Nuclear Information System (INIS)

    Drellack, S.L. Jr.

    1997-02-01

    Stratigraphic data are presented in tabular form for 72 holes drilled in Frenchman Flat, Nevada Test Site, between 1950 and 1993. Three pairs of data presentations are included for each hole: depth to formation tops, formation thicknesses, and formation elevations are presented in both field (English) and metric units. Also included for each hole, where available, are various construction data (hole depth, hole diameter, surface location coordinates) and certain information of hydrogeologic significance (depth to water level, top of zeolitization). The event name is given for holes associated with a particular nuclear test. An extensive set of footnotes is included, which indicates data sources and provides other information. The body of the report describes the stratigraphic setting of Frenchman Flat, gives drill-hole naming conventions and database terminology, and provides other background and reference material

  14. Design aspects of the Alpha Repository: VI. Selection and cost analysis of large hole drilling equipment

    International Nuclear Information System (INIS)

    Ellis, D.B.; Grams, W.H.

    1975-01-01

    An evaluation of common drilling practices and technology and applicability of currently available drilling machinery in the excavation of the canister emplacement holes for the Alpha Repository is presented. Sections are included on drilling system applications, descriptions of drilling operations, and drill system performance

  15. Drilling and geohydrologic data for test hole USW UZ-1, Yucca Mountain, Nye County, Nevada

    International Nuclear Information System (INIS)

    Whitfield, M.S.; Thordarson, W.; Hammermeister, D.P.; Warner, J.B.

    1990-01-01

    This report presents data collected to determine the hydrologic characteristics of tuffaceous rocks penetrated in test hole USW UZ-1. The borehole is the first of two deep, large-diameter, unsaturated-zone test holes dry drilled using the vacuum/reverse-air-circulation method. This test hole was drilled in and near the southwestern part of the Nevada Test Site, Nye County, Nevada, in a program conducted in cooperation with the US Department of Energy. These investigations are part of the Yucca Mountain Project (formerly the Nevada Nuclear Waste Storage Investigations) to identify a potentially suitable site for the storage of high-level radioactive wastes. Data are presented for bit and casing configurations, coring methods, sample collection, drilling rate, borehole deviation, and out-of-gage borehole. Geologic data for this borehole include geophysical logs, a lithologic log of drill-bit cuttings, and strike and distribution of fractures. Hydrologic data include water-content and water-potential measurements of drill-bit cuttings, water-level measurements, and physical and chemical analyses of water. Laboratory measurements of moisture content and matric properties from the larger drill-bit cutting fragments were considered to be representative of in-situ conditions. 3 refs., 5 figs., 10 tabs

  16. Laser-drilled micro-hole arrays on polyurethane synthetic leather for improvement of water vapor permeability

    International Nuclear Information System (INIS)

    Wu, Y.; Wang, A.H.; Zheng, R.R.; Tang, H.Q.; Qi, X.Y.; Ye, B.

    2014-01-01

    Three kinds of lasers at 1064, 532 and 355 nm wavelengths respectively were adopted to construct micro-hole arrays on polyurethane (PU) synthetic leather with an aim to improve water vapor permeability (WVP) of PU synthetic leather. The morphology of the laser-drilled micro-holes was observed to optimize laser parameters. The WVP and slit tear resistance of the laser-drilled leather were measured. Results show that the optimized pulse energy for the 1064, 532 and 355 nm lasers are 0.8, 1.1 and 0.26 mJ, respectively. The diameters of the micro-holes drilled with the optimized laser pulse energy were about 20, 15 and 10 μm, respectively. The depths of the micro-holes drilled with the optimized pulse energy were about 21, 60 and 69 μm, respectively. Compared with the untreated samples, the highest WVP growth ratio was 38.4%, 46.8% and 53.5% achieved by the 1064, 532 and 355 nm lasers, respectively. And the highest decreasing ratio of slit tear resistance was 11.1%, 14.8%, and 22.5% treated by the 1064, 532 and 355 nm lasers, respectively. Analysis of the interaction mechanism between laser beams at three kinds of laser wavelengths and the PU synthetic leather revealed that laser micro-drilling at 355 nm wavelength displayed both photochemical ablation and photothermal ablation, while laser micro-drilling at 1064 and 532 nm wavelengths leaded to photothermal ablation only.

  17. Laser-drilled micro-hole arrays on polyurethane synthetic leather for improvement of water vapor permeability

    Science.gov (United States)

    Wu, Y.; Wang, A. H.; Zheng, R. R.; Tang, H. Q.; Qi, X. Y.; Ye, B.

    2014-06-01

    Three kinds of lasers at 1064, 532 and 355 nm wavelengths respectively were adopted to construct micro-hole arrays on polyurethane (PU) synthetic leather with an aim to improve water vapor permeability (WVP) of PU synthetic leather. The morphology of the laser-drilled micro-holes was observed to optimize laser parameters. The WVP and slit tear resistance of the laser-drilled leather were measured. Results show that the optimized pulse energy for the 1064, 532 and 355 nm lasers are 0.8, 1.1 and 0.26 mJ, respectively. The diameters of the micro-holes drilled with the optimized laser pulse energy were about 20, 15 and 10 μm, respectively. The depths of the micro-holes drilled with the optimized pulse energy were about 21, 60 and 69 μm, respectively. Compared with the untreated samples, the highest WVP growth ratio was 38.4%, 46.8% and 53.5% achieved by the 1064, 532 and 355 nm lasers, respectively. And the highest decreasing ratio of slit tear resistance was 11.1%, 14.8%, and 22.5% treated by the 1064, 532 and 355 nm lasers, respectively. Analysis of the interaction mechanism between laser beams at three kinds of laser wavelengths and the PU synthetic leather revealed that laser micro-drilling at 355 nm wavelength displayed both photochemical ablation and photothermal ablation, while laser micro-drilling at 1064 and 532 nm wavelengths leaded to photothermal ablation only.

  18. Characterization of Under-Building Contamination at Rocky Flats Implementing Environmental-Measurement While Drilling Process with Horizontal Directional Drilling

    International Nuclear Information System (INIS)

    WILLIAMS, CECELIA V.; LOCKWOOD, GRANT J.; NORMANN, RANDY A.; LINDSAY, THOMAS

    2001-01-01

    Characterization is required on thirty-one buildings at Rocky Flats Environmental Technology Site (RFETS or the Site) with known or suspected under building contamination. The Site has teamed with Sandia National Laboratory (SNL) to deploy Environmental Measure-While-Drilling (EMWD) in conjunction with horizontal directional drilling (HDD) to characterize under building contamination and to evaluate the performance and applicability for future characterization efforts. The Environmental Measurement-While-Drilling-Gamma Ray Spectrometer (EMWD-GRS) system represents an innovative blend of new and existing technology that provides the capability of producing real-time environmental drill bit data during drilling operations. The project investigated two locations, Building 886 and Building 123. Building 886 is currently undergoing D and D activities. Building 123 was demolished in 1998; however, the slab is present with under building process waste lines and utilities. This report presents the results of the EMWD Gamma Ray Spectrometer logging of boreholes at these two sites. No gamma emitting contamination was detected at either location.(author)

  19. Planning, drilling and completing a record horizontal well in the Gulf of Mexico

    International Nuclear Information System (INIS)

    Johnston, R.A.; Porter, D.A.; Hill, P.L.; Smolen, B.C.

    1993-01-01

    Maximizing profits is the ultimate business objective in all drilling and completion operations. By far and away the biggest contributor to profits is the productivity of the well. Reliability and costs certainly impact profits; however, they pale in comparison to productivity when a rigorous calculation of net present value is performed. The simplest and most effective way to improve productivity is to increase the quantity of net reservoir exposed to the wellbore. A horizontal trajectory is the ultimate way to maximize the length of formation exposed to the wellbore. Drilling completion technology development over the last several years has made the use of horizontal wellbores in unconsolidated formations practical. Utilizing a unique mixture of new and existing technology, BP recently brought their first horizontal well in the Gulf of Mexico on line in record setting fashion. The planning, installation and results of this team effort are detailed in this operations oriented paper

  20. Drilling and the associated drillhole measurements of the pilot hole ONK-PH5

    International Nuclear Information System (INIS)

    Oehberg, A.; Hirvonen, H.; Jurvanen, T.; Kemppainen, K.; Mustonen, A.; Niemonen, J.; Poellaenen, J.; Rouhiainen, P.; Rautio, T.

    2006-09-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH5 was drilled from chainage 991.4 to chainage 1194 in January 2006. The length of the hole is 202.64 m and the vertical depth of the hole from zero level is about 88.2-107.5 m. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. One steering operation by wedging was made at the hole depth of 128.58 metres. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Due to high inflow (c. 200 L/min) mainly from the depth section 56-58 metres no geophysical surveys were carried out in the hole. Flow logging was carried out only from 58 metres to the bottom of the hole. Difference Flow method was used for the determination of hydraulic conductivity in fractures and fractured zones in the drillhole. The overlapping i.e. the detailed flow logging mode was used. The flow logging was performed with 0.5 m section length and with 0.1 m depth increment. Flow

  1. NNWSI [Nevada Nuclear Waste Storage Investigations] hole histories: Unsaturated zone-neutron holes: 76 boreholes drilled between May 1984 and February 1986

    International Nuclear Information System (INIS)

    1987-05-01

    This is a compilation of data from seventy-four shallow alluvial exploratory core holes and two shallow calibration core holes. The boreholes were drilled to obtain undisturbed alluvial cores, to determine vertical distribution of moisture content and water potential, and to run neutron moisture logs. Data presented in the hole histories include all locations, daily activities and review of hole conditions

  2. Drilling and the associated drillhole measurements of the pilot hole ONK-PH4

    International Nuclear Information System (INIS)

    Oehberg, A.; Heikkinen, E.; Hirvonen, H.; Kemppainen, K.; Majapuro, J.; Niemonen, J.; Poellaenen, J.; Rouhiainen, P.; Rautio, T.

    2006-09-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are mostly aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH4 was drilled in October 2005. The length of the hole is 96.01 metres. During the drilling work core samples were oriented as much as possible. The deviation of the hole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Geological logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Difference Flow method was used for the determination of hydraulic conductivity in fractures and fractured zones in the hole. The overlapping i.e. the detailed flow logging mode was used. The flow logging was performed with 0.5 m section length and with 0.1 m depth increment. Water loss tests (Lugeon tests) were used to give background information for the grouting design. Geophysical logging and optical imaging of the pilot hole PH4 included the field work of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. One of the objectives of the geochemical study was to get information of composition of ONKALO

  3. Results from exploratory drill hole UE2ce, Northwest Yucca Flat, Nevada Test Site, near the NASH Event

    International Nuclear Information System (INIS)

    Pawloski, G.A.

    1982-01-01

    Exploratory drill hole UE2ce was drilled in January 1977 to determine geologic and geophysical characteristics of this site. This report presents geophysical logs, lithology, geologic structure, water table measurements, and physical properties for this drill hole. The data are then extrapolated to the NASH site, an event in U2ce, 55.6 m due north of UE2ce

  4. Horizontal Directional Drilling (HDD) for shore approach applications

    Energy Technology Data Exchange (ETDEWEB)

    Smith, Neil [MGI do Brasil Ltda., Rio de Janeiro, RJ (Brazil)

    2003-07-01

    Horizontal directional drilling (HDD) has become a commonly used construction method for pipeline shore approaches. HDD can mitigate environmental impact, provide greater burial depths and minimize construction schedules. The risks that are associated with HDD river crossings, which are generally well recognized, also apply to HDD shore approaches where they are combined with specific risks occurring from working in the marine environment. The shore approach projects of The Bronx and Hunts Point provide good practical examples of the benefits of this technology in spite of the various challenges encountered. (author)

  5. LABORATORY EVALUATION OF CALCIUM CARBONATE PARTICLE SIZE SELECTION FOR DRILL-IN FLUIDS

    OpenAIRE

    Nediljka Gaurina-Međimurec

    2002-01-01

    The technological development in horizontal, re-entry and multilateral wells require drilling and completion the reservoir sections of a well including as little damage as possible. The trends towards open hole completion places additional emphasis on formation damage avoidance. One of critical factors in avoiding formation damage during drilling is obtaining surface bridging on the formation face with minimum indepth solids penetration. In case of overbalanced drilling, this can be donme by ...

  6. Geophysical Well-Log Measurements in Three Drill Holes at Salt Valley, Utah

    OpenAIRE

    Daniels, Jeffrey J.; Hite, Robert J.; Scott, James H.; U.S. Geological Survey

    1980-01-01

    Three exploratory drill holes were drilled at Salt Valley, Utah, to study the geologic, physical, geochemical, and hydrologic properties of the evaporite sequence in the Permian Paradox Member of the Hermosa Formation. The results of these studies will be used to help to determine the suitability of salt deposits in the Paradox basin as a storage medium for radioactive waste material.

  7. Regulation of Water Pollution from Hydraulic Fracturing in Horizontally-Drilled Wells in the Marcellus Shale Region, USA

    Directory of Open Access Journals (Sweden)

    Heather Hatzenbuhler

    2012-12-01

    Full Text Available Hydraulic fracturing is an industrial process used to extract fossil fuel reserves that lie deep underground. With the introduction of horizontal drilling, new commercial sources of energy have become available. Wells are drilled and injected with large quantities of water mixed with specially selected chemicals at high pressures that allow petroleum reserves to flow to the surface. While the increased economic activities and the outputs of domestic energy are welcomed, there is growing concern over negative environmental impacts from horizontal drilling in shale formations. The potential for water contamination, land destruction, air pollution, and geologic disruption has raised concerns about the merits of production activities used during extraction. This paper looks at the impacts of horizontal drilling using hydraulic fracturing on water supplies and takes a comprehensive look at legislative and regulatory approaches to mitigate environmental risks in the Marcellus shale region. The overview identifies shortcomings associated with regulatory controls by local and state governments and offers two policy suggestions to better protect waters of the region.

  8. Spectral and spatial resolving of photoelectric property of femtosecond laser drilled holes of GaSb(1-x)Bi(x).

    Science.gov (United States)

    Pan, C B; Zha, F X; Song, Y X; Shao, J; Dai, Y; Chen, X R; Ye, J Y; Wang, S M

    2015-07-15

    Femtosecond laser drilled holes of GaSbBi were characterized by the joint measurements of photoconductivity (PC) spectroscopy and laser-beam-induced current (LBIC) mapping. The excitation light in PC was focused down to 60 μm presenting the spectral information of local electronic property of individual holes. A redshift of energy band edge of about 6-8 meV was observed by the PC measurement when the excitation light irradiated on the laser drilled holes. The spatial resolving of photoelectric property was achieved by the LBIC mapping which shows "pseudo-holes" with much larger dimensions than the geometric sizes of the holes. The reduced LBIC current with the pseudo-holes is associated with the redshift effect indicating that the electronic property of the rim areas of the holes is modified by the femtosecond laser drilling.

  9. Preliminary analysis of geophysical logs from drill hole UE-25p No. 1, Yucca Mountain, Nye County, Nevada

    International Nuclear Information System (INIS)

    Muller, D.C.; Kibler, J.E.

    1984-01-01

    Geophysical logs from drill hole UE-25p No. 1 correlate well with logs through the same geologic units from other drill holes at Yucca Mountain, Nevada. The in-situ physical properties of the rocks as determined from well logs are consistent with laboratory-measured physical properties of core from other drill holes. The density, neutron and caliper logs are very spiky through most of the Topopah Spring Member. This spikiness occurs on the same logs in cored holes where the Topopah Spring Member is highly fractured and lithophysal. The uranium channel of the spectral gamma-ray log through the Topopah Spring Member correlates with uranium logs from cored holes where most of the fractures have not been healed or filled with materials that concentrate uranium. Therefore, fracture porosity and permeability of the Topopah Spring Member are expected to be high and consistent with fracture analysis from other drill holes on Yucca Mountain, and hydrologic tests from well J-13. The Paleozoic dolomites which underlie the Tertiary tuffs are intensely brecciated, and the uranium count rate is much higher than normal for dolomites because uranium has been concentrated in the recementing material. 19 references, 1 figure, 2 tables

  10. Drilling and the associated drillhole measurements of the pilot hole ONK-PH8

    International Nuclear Information System (INIS)

    Karttunen, P.; Poellaenen, J.; Rautio, T.; Tarvainen, A.-M.; Lamminmaeki, T.; Kemppainen, K.; Kosunen, P.; Lampinen, H.

    2009-02-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH8 was drilled from chainage 3116 to chainage 3266.29 in June- July 2008. The length of the hole is 150.29 metres. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Water conductivity of the fractures or fractured zones was measured by Posiva Flow Log equipment. The measurements were done in two phases. During flow measurements also grounding resistance, electric conductivity and temperature were measured. In flow logging test sections of 0.5 m and increments of 0.1 m were used. The water loss measurements failed. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss, and weathering. The rock mechanical logging was based on Q-classification. The test to determine rock strength and deformation were made with Rock Tester-equipment. Geophysical logging and optical imaging of the pilot hole included the fieldwork of all surveys, the integration of the data as well as interpretation of the acoustic and drillhole radar data. One of the objectives of the geochemical study was to get information of the composition of ONKALO

  11. Evaluation of Hole Quality in Hardened Steel with High-Speed Drilling Using Different Cooling Systems

    Directory of Open Access Journals (Sweden)

    Lincoln Cardoso Brandão

    2011-01-01

    Full Text Available This work evaluates the hole quality on AISI H13 hardened steel using high-speed drilling. Specimens were machined with new and worn out drills with 8.6 mm diameter and (TiAlN coating. Two levels of cutting speed and three levels of cooling/lubrication systems (flooded, minimum lubrication quantity, and dry were used. The hole quality is evaluated on surface roughness (Ra parameter, diameter error, circularity, and cylindricity error. A statistical analysis of the results shows that the cooling/lubrication system significantly affects the hole quality for all measured variables. This analysis indicates that dry machining produces the worst results. Higher cutting speeds not only prove beneficial to diameter error and circularity errors, but also show no significant difference on surface roughness and cylindricity errors. The effects of the interaction between the cooling/lubrication systems, tool wear, and cutting speed indicate that only cylindricity error is influenced. Thus, the conclusion is that the best hole quality is produced with a higher cutting speed using flooded or minimum lubrication quantity independent of drill wear.

  12. Practical calibration of design data to technical capabilities of horizontal directional drilling rig

    Science.gov (United States)

    Toropov, S. Yu; Toropov, V. S.

    2018-05-01

    In order to design more accurately trenchless pipeline passages, a technique has been developed for calculating the passage profile, based on specific parameters of the horizontal directional drilling rig, including the range of possible drilling angles and a list of compatible drill pipe sets. The algorithm for calculating the parameters of the trenchless passage profile is shown in the paper. This algorithm is based on taking into account the features of HDD technology, namely, three different stages of production. The authors take into account that the passage profile is formed at the first stage of passage construction, that is, when drilling a pilot well. The algorithm involves calculating the profile by taking into account parameters of the drill pipes used and angles of their deviation relative to each other during the pilot drilling. This approach allows us to unambiguously calibrate the designed profile for the HDD rig capabilities and the auxiliary and navigation equipment used in the construction process.

  13. Preliminary petrographic and geophysical interpretations of the exploratory geothermal drill hole and core, Redstone, New Hampshire

    Energy Technology Data Exchange (ETDEWEB)

    Hoag, R.B. Jr.; Stewart, G.W.

    1977-06-30

    A 3000 foot diamond drill hole was drilled in the Conway Granite in Redstone, New Hampshire. A comprehensive detailed petrographic and physical study of this core was made. The purpose of this study is to supply a sound data base for future geothermal and uranium-thorium studies of the drill core. An estimate of the heat flow potential of the Redstone drill hole gives a heat flow of 1.9 HFU. If only the red phase of the Conway Granite had been intersected the heat flow may have been as much as 2.7 HFU, reaching a temperature of 260/sup 0/C at 6 km. The drill hole intersected four lithologies; the green and red phase of the Conway Granite, the Albany quartz syenite and a medium-grained, hastingsite-biotite granite. The red phase has the highest and most irregular radioactivity. The irregularity is mainly due to minor variations in lithology. The drill core intersected several alteration zones up to a thickness of 150 feet. These alteration zones represent passage of low to medium temperature fluids which might have been mineralized. The Conway Granite has the physical and chemical characteristics necessary for the formation of vein type uranium deposits. The presence of unexplained radiometric anomalies lends support to the existence of such deposits.

  14. Overview of Hole GT2A: Drilling middle gabbro in Wadi Tayin massif, Oman ophiolite

    Science.gov (United States)

    Takazawa, E.; Kelemen, P. B.; Teagle, D. A. H.; Coggon, J. A.; Harris, M.; Matter, J. M.; Michibayashi, K.

    2017-12-01

    Hole GT2A (UTM: 40Q 655960.7E / 2529193.5N) was drilled by the Oman Drilling Project (OmDP) into Wadi Gideah of Wadi Tayin massif in the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole GT2A was diamond cored in 25 Dec 2016 to 18 Jan 2017 to a total depth of 406.77 m. The outer surfaces of the cores were imaged and described on site before being curated, boxed and shipped to the IODP drill ship Chikyu, where they underwent comprehensive visual and instrumental analysis. 33 shipboard scientists were divided into six teams (Igneous, Alteration, Structural, Geochem, Physical Properties, Paleomag) to describe and analyze the cores. Hole GT2A drilled through the transition between foliated and layered gabbro. The transition zone occurs between 50 and 150 m curation corrected depth (CCD). The top 50 m of Hole GT2A is foliated gabbro whereas the bottom 250 m consists of layered gabbro. Brittle fracture is observed throughout the core. Intensity of alteration vein decreases from the top to the bottom of the hole. On the basis of changes in grain size and/or modal abundance and/or appearance/disappearance of igneous primary mineral(s) five lithological units are defined in Hole GT2A (Unit I to V). The uppermost part of Hole GT2A (Unit I) is dominated by fine-grained granular olivine gabbro intercalated with less dominant medium-grained granular olivine gabbro and rare coarse-grained varitextured gabbro. The lower part of the Hole (Units II, III and V) is dominated by medium-grained olivine gabbro, olivine melagabbro and olivine-bearing gabbro. Modally-graded rhythmic layering with

  15. Investigation on the Effect of a Pre-Center Drill Hole and Tool Material on Thrust Force, Surface Roughness, and Cylindricity in the Drilling of Al7075.

    Science.gov (United States)

    Ghasemi, Amir Hossein; Khorasani, Amir Mahyar; Gibson, Ian

    2018-01-16

    Drilling is one of the most useful metal cutting processes and is used in various applications, such as aerospace, electronics, and automotive. In traditional drilling methods, the thrust force, torque, tolerance, and tribology (surface roughness) are related to the cutting condition and tool geometry. In this paper, the effects of a pre-center drill hole, tool material, and drilling strategy (including continuous and non-continuous feed) on thrust force, surface roughness, and dimensional accuracy (cylindricity) have been investigated. The results show that using pre-center drill holes leads to a reduction of the engagement force and an improvement in the surface quality and cylindricity. Non-continuous drilling reduces the average thrust force and cylindricity value, and High Speed Steels HSS-Mo (high steel speed + 5-8% Mo) reduces the maximum quantity of cutting forces. Moreover, cylindricity is directly related to cutting temperature and is improved by using a non-continuous drilling strategy.

  16. Investigation on the Effect of a Pre-Center Drill Hole and Tool Material on Thrust Force, Surface Roughness, and Cylindricity in the Drilling of Al7075

    Directory of Open Access Journals (Sweden)

    Amir Hossein Ghasemi

    2018-01-01

    Full Text Available Drilling is one of the most useful metal cutting processes and is used in various applications, such as aerospace, electronics, and automotive. In traditional drilling methods, the thrust force, torque, tolerance, and tribology (surface roughness are related to the cutting condition and tool geometry. In this paper, the effects of a pre-center drill hole, tool material, and drilling strategy (including continuous and non-continuous feed on thrust force, surface roughness, and dimensional accuracy (cylindricity have been investigated. The results show that using pre-center drill holes leads to a reduction of the engagement force and an improvement in the surface quality and cylindricity. Non-continuous drilling reduces the average thrust force and cylindricity value, and High Speed Steels HSS-Mo (high steel speed + 5–8% Mo reduces the maximum quantity of cutting forces. Moreover, cylindricity is directly related to cutting temperature and is improved by using a non-continuous drilling strategy.

  17. Lower crustal section of the Oman Ophiolite drilled in Hole GT1A, ICDP Oman Drilling Project

    Science.gov (United States)

    Umino, S.; Kelemen, P. B.; Matter, J. M.; Coggon, J. A.; Takazawa, E.; Michibayashi, K.; Teagle, D. A. H.

    2017-12-01

    Hole GT1A (22° 53.535'N, 58° 30.904'E) was drilled by the Oman Drilling Project (OmDP) into GT1A of the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole GT1A was diamond cored in 22 Jan to 08 Feb 2017 to a total depth of 403.05 m. The outer surfaces of the cores were imaged and described on site before being curated, boxed and shipped to the IODP drill ship Chikyu, where they underwent comprehensive visual and instrumental analysis. Hole GT1A drilled the lower crustal section in the southern Oman Ophiolite and recovered 401.52 m of total cores (99.6% recovery). The main lithology is dominated by olivine gabbro (65.9%), followed in abundance by olivine-bearing gabbro (21.5%) and olivine melagabbro (3.9%). Minor rock types are orthopyroxene-bearing olivine gabbro (2.4%), oxide-bearing olivine gabbro (1.5%), gabbro (1.1%), anorthositic gabbro (1%), troctolitic gabbro (0.8%); orthopyroxene-bearing gabbro (0.5%), gabbronorite (0.3%); and dunite (0.3%). These rocks are divided into Lithologic Unit I to VII at 26.62 m, 88.16 m, 104.72 m, 154.04 m, 215.22 m, 306.94 m in Chikyu Curated Depth in descending order; Unit I and II consist of medium-grained olivine gabbro with lower olivine abundance in Unit II. Unit III is medium-grained olivine melagabbros, marked by an increase in olivine. Unit IV is relatively homogenous medium-grained olivine gabbros with granular textures. Unit V is identified by the appearance of fine-grained gabbros, but the major rocktypes are medium grained olivine gabbros. Unit VI is medium-grained olivine gabbro, marked by appearance of orthopyroxene. Unit VII

  18. Horizontal drilling in a natural gas storage horizon of 4 m thickness using reservoir navigation technology

    Energy Technology Data Exchange (ETDEWEB)

    Bastert, Thomas [E.ON Gas Storage GmbH, Essen (Germany); Liewert, Mathias; Rohde, Uwe [Baker Hughes INTEQ GmbH, Celle (Germany); Haberland, Joachim

    2010-09-15

    With a working gas capacity of 1,44 billion m{sup 3} (Vn) the natural gas storage facility at Bierwang is one of the largest storage facilities of E.ON Gas Storage (in Germany) and also one of the largest porous rock storages in Germany. The natural gas is stored in the tertiary storage horizons of the Chattian Hauptsand and Nebensand. To increase the storage capacity a second development well was planned for the Chattian Nebensand II (approx. 1680 m below ground). Following a comprehensive technical investigation the BW 502 well was planned as a horizontal well intended to provide a 300 m exposed section length through the reservoir. In a first step a pilot well was drilled to examine the Nebensand II which had been explored only to a limited extent before; the pilot well was also to provide accurate data on depth, thickness and dip. The results obtained indicated that the Nebensand II was only 4 m thick instead of 6 m as originally assumed. An azimuthal LWD resistivity tool was therefore used for reservoir navigation to allow horizontal drilling despite the lower thickness found. The technology allowed drilling of the horizontal well over its entire length of 315 m within a max. 1.5 m corridor relative to the reservoir top. Drilling confirmed that the actual formation found corresponded to the reservoir formation plan. Drilling operations were completed successfully. The well has been commissioned in the spring of 2010. (orig.)

  19. A finite element model for analyzing horizontal well BHA behavior

    Energy Technology Data Exchange (ETDEWEB)

    Akgun, F. [Petroleum Engineering, The Petroleum Institute, P.O. Box 17555, Al-Ain (United Arab Emirates)

    2004-04-01

    Horizontal wells are proven to be better producers because they can be extended for a long distance in the pay zone. Engineers have the technical means to forecast the well productivity for a given horizontal length. However, experiences have shown that the actual production rate is often significantly less than that of forecasted. There are a number of reasons for the discrepancy of predicted to actual production rates in horizontal wells. However, it is a difficult task, if not impossible, to identify the real reason why a horizontal well is not producing what was forecasted. Often, the source of problem lies in the drilling of horizontal section such as permeability reduction in the pay zone due to mud invasion or snaky well patterns created during drilling. Although drillers aim to drill a constant inclination hole once in the pay zone, the more frequent outcome is a sinusoidal wellbore trajectory. Logging while drilling (LWD) and real time measurement of resistivity at bit help drill in the pay zone by constant monitoring of borehole trajectory and formation boundaries. Rotary steerable tools (RTS) allow spontaneous intervention to drilling direction and inclination if run with LWD tools. Nevertheless, there are still many cases where LWD cannot be deployed due to technical difficulties. One such case was noticed in the Middle East where LWD sensors were worn out completely during 1 h run time due to extreme formation abrasiveness. In the absence of LWD and RTS, it becomes a challenging task to drill a constant inclination borehole which will be addressed in this paper. The two factors, which play an important role in wellbore tortuosity, are the inclination and side force at bit. A constant inclination horizontal well can only be drilled if the bit face is maintained perpendicular to the longitudinal axis of bottom hole assembly (BHA) while keeping the side force nil at the bit. This approach assumes that there exists no formation force at bit. Hence, an

  20. Insights into the radial water jet drilling technology – Application in a quarry

    Directory of Open Access Journals (Sweden)

    Thomas Reinsch

    2018-04-01

    Full Text Available In this context, we applied the radial water jet drilling (RJD technology to drill five horizontal holes into a quarry wall of the Gildehaus quarry close to Bad Bentheim, Germany. For testing the state-of-the-art jetting technology, a jetting experiment was performed to investigate the influence of geological heterogeneity on the jetting performance and the hole geometry, the influence of nozzle geometry and jetting pressure on the rate of penetration, and the possibility of localising the jetting nozzle utilizing acoustic activity. It is observed that the jetted holes can intersect fractures under varying angles, and the jetted holes do not follow a straight path when jetting at ambient surface condition. Cuttings from the jetting process retrieved from the holes can be used to estimate the reservoir rock permeability. Within the quarry, we did not observe a change in the rate of penetration due to jetting pressure variations. Acoustic monitoring was partially successful in estimating the nozzle location. Although the experiments were performed at ambient surface conditions, the results can give recommendations for a downhole application in deep wells. Keywords: Acoustic monitoring, Drilling performance, Trajectory, Permeability, Rock properties, Radial water jet drilling (RJD

  1. Remarks on residual stress measurement by hole-drilling and electronic speckle pattern interferometry.

    Science.gov (United States)

    Barile, Claudia; Casavola, Caterina; Pappalettera, Giovanni; Pappalettere, Carmine

    2014-01-01

    Hole drilling is the most widespread method for measuring residual stress. It is based on the principle that drilling a hole in the material causes a local stress relaxation; the initial residual stress can be calculated by measuring strain in correspondence with each drill depth. Recently optical techniques were introduced to measure strain; in this case, the accuracy of the final results depends, among other factors, on the proper choice of the area of analysis. Deformations are in fact analyzed within an annulus determined by two parameters: the internal and the external radius. In this paper, the influence of the choice of the area of analysis was analysed. A known stress field was introduced on a Ti grade 5 sample and then the stress was measured in correspondence with different values of the internal and the external radius of analysis; results were finally compared with the expected theoretical value.

  2. Key technologies for well drilling and completion in ultra-deep sour gas reservoirs, Yuanba Gasfield, Sichuan Basin

    Directory of Open Access Journals (Sweden)

    Jiaxiang Xia

    2016-12-01

    Full Text Available The Yuanba Gasfield is a large gas field discovered by Sinopec in the Sichuan Basin in recent years, and another main exploration area for natural gas reserves and production increase after the Puguang Gasfield. The ultra-deep sour gas reservoir in the Yuanba Gasfield is characterized by complicated geologic structure, deep reservoirs and complex drilled formation, especially in the continental deep strata which are highly abrasive with low ROP (rate of penetration and long drilling period. After many years of drilling practice and technical research, the following six key drilling and completion technologies for this type reservoir are established by introducing new tools and technologies, developing specialized drill bits and optimizing drilling design. They are: casing program optimization technology for ROP increasing and safe well completion; gas drilling technology for shallow continental strata and high-efficiency drilling technology for deep high-abrasion continental strata; drilling fluid support technologies of gas–liquid conversion, ultra-deep highly-deviated wells and horizontal-well lubrication and drag reduction, hole stability control and sour gas contamination prevention; well cementing technologies for gas medium, deep-well long cementing intervals and ultra-high pressure small space; horizontal-well trajectory control technologies for measuring instrument, downhole motor optimization and bottom hole assembly design; and liner completion modes and completion string optimization technologies suitable for this gas reservoir. Field application shows that these key technologies are contributive to ROP increase and efficiency improvement of 7000 m deep horizontal wells and to significant operational cycle shortening.

  3. Lithologic and geophysical logs of drill holes Felderhoff Federal 5-1 and 25-1, Amargosa Desert, Nye County, Nevada

    International Nuclear Information System (INIS)

    Carr, W.J.; Grow, J.A.; Keller, S.M.

    1995-01-01

    Two wildcat oil and gas exploration holes drilled in 1991 on the northern edge of the Amargosa Desert penetrated Tertiary and Quaternary sedimentary rocks, alluvium, and basalt, possible Tertiary volcanic or volcaniclastic rocks, and Tertiary (?) and Paleozoic carbonate rocks. The easternmost of the two holes, Felderhoff-Federal 5-1, encountered about 200 feet of alluvium, underlain by 305 feet of basalt breccia and basalt, about 345 feet of probable Tertiary tuffaceous sedimentary rocks, and 616 feet of dense limestone and dolomite of uncertain age. Drill hole 25-1 penetrated 240 feet of alluvium and marl (?), and 250 feet of basalt breccia (?) and basalt, 270 feet of tuff (?) and/or tuffaceous sedimentary rocks, 360 feet of slide blocks (?) and large boulders of Paleozoic carbonate rocks, and 2,800 feet of Paleozoic limestone and dolomite. The two drill holes are located within a northerly trending fault zone defined largely by geophysical data; this fault zone lies along the east side of a major rift containing many small basalt eruptive centers and, farther north, several caldera complexes. Drill hole 25-1 penetrated an inverted paleozoic rock sequence; drill hole 5-1 encountered two large cavities 24-inches wide or more in dense carbonate rock of uncertain, but probable Paleozoic age. These openings may be tectonic and controlled by a regional system of northeast-striking faults

  4. Measurement of residual stress fields in FHPP welding: a comparison between DSPI combined with hole-drilling and neutron diffraction

    Science.gov (United States)

    Viotti, Matias R.; Albertazzi, Armando; Staron, Peter; Pisa, Marcelo

    2013-04-01

    This paper shows a portable device to measure mainly residual stress fields outside the optical bench. This system combines the traditional hole drilling technique with Digital Speckle Pattern Interferometry. The novel feature of this device is the high degree of compaction since only one base supports simultaneously the measurement module and the hole-drilling device. The portable device allows the measurement of non-uniform residual stresses in accordance with the ASTM standard. In oil and gas offshore industries, alternative welding procedures among them, the friction hydro pillar processing (FHPP) is highlighted and nowadays is an important maintenance tool since it has the capability to produce structure repairs without risk of explosions. In this process a hole is drilled and filled with a consumable rod of the same material. The rod, which could be cylindrical or conical, is rotated and pressed against the hole, leading to frictional heating. In order to assess features about the residual stress distribution generated by the weld into the rod as well as into the base material around the rod, welded samples were evaluated by neutron diffraction and by the hole drilling technique having a comparison between them. For the hole drilling technique some layers were removed by using electrical discharge machining (EDM) after diffraction measurements in order to assess the bulk stress distribution. Results have shown a good agreement between techniques.

  5. The effect of optical system design for laser micro-hole drilling process

    Science.gov (United States)

    Ding, Chien-Fang; Lan, Yin-Te; Chien, Yu-Lun; Young, Hong-Tsu

    2017-08-01

    Lasers are a promising high accuracy tool to make small holes in composite or hard material. They offer advantages over the conventional machining process, which is time consuming and has scaling limitations. However, the major downfall in laser material processing is the relatively large heat affect zone or number of molten burrs it generates, even when using nanosecond lasers over high-cost ultrafast lasers. In this paper, we constructed a nanosecond laser processing system with a 532 nm wavelength laser source. In order to enhance precision and minimize the effect of heat generation with the laser drilling process, we investigated the geometric shape of optical elements and analyzed the images using the modulation transfer function (MTF) and encircled energy (EE) by using optical software Zemax. We discuss commercial spherical lenses, including plano-convex lenses, bi-convex lenses, plano-concave lenses, bi-concave lenses, best-form lenses, and meniscus lenses. Furthermore, we determined the best lens configuration by image evaluation, and then verified the results experimentally by carrying out the laser drilling process on multilayer flexible copper clad laminate (FCCL). The paper presents the drilling results obtained with different lens configurations and found the best configuration had a small heat affect zone and a clean edge along laser-drilled holes.

  6. A synopsis of environmental horizontal wells at the Savannah River Site

    International Nuclear Information System (INIS)

    Denham, M.E.; Lombard, K.H.

    1995-01-01

    Seven horizontal wells for environmental remediation were installed at the Savannah River Site as part of an Integrated Demonstration Project sponsored by the Department of Energy's Office of Technology Development. The wells were used to demonstrate innovative remediation systems for the clean up of chlorinated organic solvent contamination in groundwater and the vadose zone. The wells were installed in four demonstrations of different horizontal drilling technologies. A short-radius petroleum industry technology, a modified petroleum industry technology (using a down-hole motor), a utility industry technology, and a river crossing technology were demonstrated. The goals of the demonstrations were to show the utility of horizontal wells in environmental remediation and further development of the technology required to install these wells. From the first demonstration in 1988 to the latest in 1991, there was significant evolution in horizontal drilling technology. The main technical challenges in the first demonstration were directional control during drilling and borehole instability. Through advancement of the technology these problems were overcome and did not affect the last demonstration. Those considering the use of horizontal wells for environmental remediation will benefit from the knowledge gained from these demonstrations

  7. Remarks on Residual Stress Measurement by Hole-Drilling and Electronic Speckle Pattern Interferometry

    Directory of Open Access Journals (Sweden)

    Claudia Barile

    2014-01-01

    Full Text Available Hole drilling is the most widespread method for measuring residual stress. It is based on the principle that drilling a hole in the material causes a local stress relaxation; the initial residual stress can be calculated by measuring strain in correspondence with each drill depth. Recently optical techniques were introduced to measure strain; in this case, the accuracy of the final results depends, among other factors, on the proper choice of the area of analysis. Deformations are in fact analyzed within an annulus determined by two parameters: the internal and the external radius. In this paper, the influence of the choice of the area of analysis was analysed. A known stress field was introduced on a Ti grade 5 sample and then the stress was measured in correspondence with different values of the internal and the external radius of analysis; results were finally compared with the expected theoretical value.

  8. The tunnel project. Drill hole logging and structural geologic studies in the Grualia, the Lunner county

    International Nuclear Information System (INIS)

    Elvebakk, Harald; Braathen, Alvar; Roenning, Jan S.; Nordgulen, Oeystein

    2001-01-01

    In connection with the project ''Environmental and community useful tunnels'' the Norwegian Geologic Survey (NGU) has made geologic and geophysical investigations along parts of the tunnel at the Grualia in the Lunner county. The purpose of the geologic studies was to map and investigate weakness zones in the rock foundations. The geophysical studies aimed at testing techniques that was in little use in preliminary studies for tunnel operations. The methods used have been optical inspection of drill holes, measurements of temperature and conductivity in the water and the measuring of the natural gamma radiation in the drill holes. The resistivity in the drill holes is also determined and test pumping with flow measurements is carried out in order to calculate the well water influx capacity. These methods may contribute to information about the rock condition (cracking, water influx). Previously the NGU has made 2D resistivity measurements at the ground in the tunnel in order to map the weakness zones. The results from the measurements in 6 wells show large variations in the rock qualities. The wells are drilled towards indicated weakness zones. Open water conducting cracks and sections with largely cracked rocks are detected in or in the proximity of the tunnel route. The weakness zone between the hornfels and the syenite west of the Langvatnet is largely cracked, has a large water conducting capacity and there are some unstable masses. Further east several open, water- conducting cracks are detected in the syenite. Furthest to the east in the route cracked and unstable rocks are found. Several of the holes are blocked by ravines which confirm the poor rock quality. In the particular areas problems are to be expected during the operation with respect to water influx and stability. Methodically the drill hole studies have shown great value for the follow up of the 2D resistivity measurements on the ground. The indicated weakness zones through the 2D have been

  9. Coral ages and island subsidence, Hilo drill hole

    Science.gov (United States)

    Moore, J.G.; Ingram, B.L.; Ludwig, K. R.; Clague, D.A.

    1996-01-01

    A 25.8-m-thick sedimentary section containing coral fragments occurs directly below a surface lava flow (the ???1340 year old Panaewa lava flow) at the Hilo drill hole. Ten coral samples from this section dated by accelerator mass spectrometry (AMS) radiocarbon and five by thermal infrared multispectral scanner (TIMS) 230Th/U methods show good agreement. The calcareous unit is 9790 years old at the bottom and 1690 years old at the top and was deposited in a shallow lagoon behind an actively growing reef. This sedimentary unit is underlain by a 34-m-thick lava flow which in turn overlies a thin volcaniclastic silt with coral fragments that yield a single 14C date of 10,340 years. The age-depth relations of the dated samples can be compared with proposed eustatic sea level curves after allowance for island subsidence is taken. Island subsidence averages 2.2 mm/yr for the last 47 years based on measurements from a tide gage near the drill hole or 2.5-2.6 mm/yr for the last 500,000 years based on the ages and depths of a series of drowned coral reefs offshore from west Hawaii. The age-depth measurements of coral fragments are more consistent with eustatic sea levels as determined by coral dating at Barbados and Albrolhos Islands than those based on oxygen isotopic data from deep sea cores. The Panaewa lava flow entered a lagoon underlain by coral debris and covered the drill site with 30.9 m of lava of which 11 m was above sea level. This surface has now subsided to 4.2 m above sea level, but it demonstrates how a modern lava flow entering Hilo Bay would not only change the coastline but could extensively modify the offshore shelf.

  10. Drilling and the associated drillhole measurements of the pilot hole ONK-PH6

    International Nuclear Information System (INIS)

    Oehberg, A.; Hirvonen, H.; Kemppainen, K.; Niemonen, J.; Nordbaeck, N.; Poellaenen, J.; Rouhiainen, P.; Rautio, T.; Tarvainen, A.-M.

    2007-08-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are drillholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes are aimed to confirm the quality of the rock mass for tunnel construction, and in particular to identify water conductive fractured zones and to provide information that could result in modifications of the existing construction plans. The pilot hole ONK-PH6 was drilled from chainage 1404 to chainage 1559 in September 2006. The length of the hole is 155.04 m. The aim during the drilling work was to orient core samples as much as possible. The deviation of the drillhole was measured during and after the drilling phase. One steering operation by wedging was made at the hole depth of 94.05 metres (top of the wedge). Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Difference Flow method was used for the determination of hydraulic conductivity in fractures and fractured zones in the drillhole. The overlapping i.e. the detailed flow logging mode was used. Besides flow logging Single Point Resistance (SPR), Electric Conductivity (EC) and temperature of the drillhole water were also measured. The flow logging was performed with 0.5 m section length and with 0.1 m depth increment. Water loss tests were conducted in the hole excluding the section 89.04 - 101.04 metres due to the wedge. Geophysical logging

  11. Structure in continuously cored, deep drill holes at Yucca Mountain, Nevada, with notes on calcite occurrence

    International Nuclear Information System (INIS)

    Carr, W.J.

    1992-12-01

    A study of more than 22,000 feet of core from five deep drill holes at Yucca Mountain, Nevada, provided data on the attitude and vertical distribution of faults and fractures, the sense of fault displacement, and the occurrence of calcite. The study was done mainly to look for evidence of fault flattening at depth, but no consistent downward decrease in dip of faults was found, and no increase in strata rotation was evident with increasing depth. In the two drill holes located near prominent faults that dip toward the holes (USW G-3 and G-2), an apparent increase in the frequency of faults occurs below the tuffs and lavas of Calico Hills. Some of this increase occurs in brittle lavas and flow breccias in the lower part of the volcanic section. In the two holes presumed to be relatively removed from the influence of important faults at depth, the vertical distribution of faults is relatively uniform. Calcite occurs mainly in two general zones, voids in welded portions of the Paintbrush Tuff, and in a deeper zone, mostly below 3,500 feet. Calcite is least abundant in USW G-4, which may reflect the fewer faults and fractures encountered in that drill hole

  12. Development of controlled drilling technology and measurement method in the borehole. Phase 2. Upgrading of drilling and measurement system and its application to the fault

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Shin, Koichi; Ohtsu, Masashi

    2009-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for High Level Waste (HLW) disposal. Especially, the soft sedimentary rock at the coastal area is thought to be one of the best candidates, since there is little driving force of the underground water. The measurement and logging of the bore hole in order to investigate the hydro-geological and geo-mechanical conditions of the host rock is a very important way to examine the potential of the disposal candidates. Since 2000, CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project on controlled drilling and the logging/measurement technologies in its boreholes. Based on the results of phase 1(2000-2004), CRIEPI has been developing the drilling and logging/measurement technologies for fault zone during phase 2 (2005-2007). The drilling technology such as drilling for fault zone, horizontal drilling, long hole drilling, coring and locality detection was developed and these applicability was confirmed while drilling. The permeability/water-sampling/imaging tool was revised to apply wider borehole and longer measuring section. The WL-LWD was improved to be tougher in the hole. The borehole pressure meter and stress measurement tools were unified. Each tools necessary for the monitoring system is manufactured. The applicability of these tools and systems were verified in the borehole. After conducting surveys for the Omagari fault distributing at the Kami-horonobe area, the drilling site and borehole trace was decided in 2005. Considering the planned trace, the bore hole was drilled to the 683.5m long and its core recovery was 99.8%. Using borehole logging/measurement/survey, the geological, hydrological, geo-mechanical, geophysical and geochemical data were collected and the Omagari fault was characterized. (author)

  13. Archive of Core and Site/Hole Data and Photographs from the Deep Sea Drilling Project (DSDP)

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Deep Sea Drilling Project (DSDP) operated the D/V GLOMAR CHALLENGER from 1968-1983, drilling 1,112 holes at 624 sites worldwide. The DSDP was funded by the US...

  14. On KNBK for the preparation of shafts of drill-holes for the sinking casing strings

    Energy Technology Data Exchange (ETDEWEB)

    Sukhanov, V B; Shchukin, R K

    1981-01-01

    An experimental preparation of drill-holes for reinforcement performed by the Kubanomor neftagazprom firm is given based on the use of traditional KNBK of increasing rigidity after the interval has been completely drilled and KNBK inserted into the superchisel part of the flywheel, UBTS or rotary stabilizer, the outer diameters of which are determined computationally and help in preparation of the shaft for reinforcement in the process of rotary drilling.

  15. Influence of friction on buckling of a drill string in the circular channel of a bore hole

    Directory of Open Access Journals (Sweden)

    Valery Gulyayev

    2016-10-01

    Full Text Available Abstract Enhancement of technology and techniques for drilling deep directed oil and gas bore hole is one of the most important problems of the current petroleum industry. Not infrequently, the drilling of these bore holes is attended by occurrence of extraordinary situations associated with technical accidents. Among these is the Eulerian loss of stability of a drill string in the channel of a curvilinear bore hole. Methods of computer simulation should play a dominant role in prediction of these states. In this paper, a new statement of the problem of critical buckling of the drill strings in 3D curvilinear bore holes is proposed. It is based on combined use of the theory of curvilinear elastic rods, Eulerian theory of stability, theory of channel surfaces, and methods of classical mechanics of systems with nonlinear constraints. It is noted that the stated problem is singularly perturbed and its solutions have the shapes of localized harmonic wavelets. The calculation results showed that the friction effects lead to essential redistribution of internal axial forces, as well as changing the eigenmode shapes and sites of their localization. These features make the buckling phenomena less predictable and raise the role of computer simulation of these effects.

  16. Demonstration of Eastman Christensen horizontal drilling system -- Integrated Demonstration Site, Savannah River Site

    International Nuclear Information System (INIS)

    1992-12-01

    An innovative horizontal drilling system was used to install two horizontal wells as part of an integrated demonstration project at the Savannah River Site (SRS), Aiken, South Carolina. The SRS is located in south-central South Carolina in the upper Coastal Plain physiographic province. The demonstration site is located near the A/M Area, and is currently known as the Integated Demonstration Site. The Department of Energy's Office of Technology Development initiated an integrated demonstration of innovative technologies for cleanup of volatile organic compounds (VOCS) in soils and groundwater at the SRS in 1989. The overall goal of the program is to demonstrate, at a single location, multiple technologies in the fields of drilling, characterization, monitoring, and remediation. Innovative technologies are compared to one another and to baseline technologies in terms of technical performance and cost effectiveness. Transfer of successfully demonstrated technologies and systems to DOE environmental restoration organizations, to other government agencies, and to industry is a critical part of the program

  17. Residual stress measurement in veneering ceramic by hole-drilling.

    Science.gov (United States)

    Mainjot, Amélie K; Schajer, Gary S; Vanheusden, Alain J; Sadoun, Michaël J

    2011-05-01

    Mismatch in thermal expansion properties between veneering ceramic and metallic or high-strength ceramic cores can induce residual stresses and initiate cracks when combined with functional stresses. Knowledge of the stress distribution within the veneering ceramic is a key factor for understanding and predicting chipping failures, which are well-known problems with Yttria-tetragonal-zirconia-polycrystal based fixed partial dentures. The objectives of this study are to develop a method for measuring the stress profile in veneering ceramics and to compare ceramic-fused-to-metal compounds to veneered Yttria-tetragonal-zirconia-polycrystal ceramic. The hole-drilling method, often used for engineering measurements, was adapted for use with veneering ceramic. Because of the high sensitivity needed in comparison with industrial applications, a high sensitivity electrical measurement chain was developed. All samples exhibited the same type of stress vs. depth profile, starting with compressive at the ceramic surface, decreasing with depth and becoming tensile at 0.5-1.0mm from the surface, and then becoming slightly compressive again. The zirconia samples exhibited a stress depth profile of larger magnitude. The hole drilling method was shown be a practical tool for measuring residual stresses in veneering ceramics. Copyright © 2010 Academy of Dental Materials. Published by Elsevier Ltd. All rights reserved.

  18. Drilling and the associated borehole measurements of the pilot hole ONK-PH2

    International Nuclear Information System (INIS)

    Oehberg, A.; Aaltonen, I.; Kemppainen, K.; Mattila, J.; Heikkinen, E.; Lahti, M.; Pussinen, V.; Niemonen, J.; Paaso, N.; Rouhiainen, P.

    2005-11-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are boreholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes will mostly aim to confirm the quality of the rock mass for tunnel construction, and in particular at identifying water conductive fractured zones and at providing information that could result in modifications of the existing construction plans. The pilot hole ONK-PH2 was drilled in December 2004. The length of the borehole is about 122 metres. The aim during the drilling work was to orientate core samples as much as possible. The deviation of the borehole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Difference Flow method was used for the determination of hydraulic conductivity and hydraulic head in fractures and fractured zones in the borehole. The overlapping i.e. the detailed flow logging mode was used. The flow logging was performed with 0.5 m section length and with 0.1 m depth increments. Geophysical borehole logging and optical imaging surveys of the pilot hole PH2 included the field work of all the surveys, the integration of the data as well as interpretation of the acoustic and borehole radar data. One of the objectives of the geochemical study was to get information of composition of ONKALO's groundwater before the construction will

  19. Drilling and the associated borehole measurements of the pilot hole ONK-PH3

    International Nuclear Information System (INIS)

    Oehberg, A.; Heikkinen, E.; Hirvonen, H.; Kemppainen, K.; Majapuro, J.; Niemonen, J.; Poellaenen, J.; Rouhiainen, P.

    2006-03-01

    The construction of the ONKALO access tunnel started in September 2004 at Olkiluoto. Most of the investigations related to the construction of the access tunnel aim to ensure successful excavations, reinforcement and sealing. Pilot holes are boreholes, which are core drilled along the tunnel profile. The length of the pilot holes typically varies from several tens of metres to a couple of hundred metres. The pilot holes will mostly aim to confirm the quality of the rock mass for tunnel construction, and in particular at identifying water conductive fractured zones and at providing information that could result in modifications of the existing construction plans. The pilot hole ONK-PH3 was drilled in September 2005. The length of the borehole is 145.04 metres. The aim during the drilling work was to orientate core samples as much as possible. The deviation of the borehole was measured during and after the drilling phase. Electric conductivity was measured from the collected returning water samples. Logging of the core samples included the following parameters: lithology, foliation, fracturing, fracture frequency, RQD, fractured zones, core loss and weathering. The rock mechanical logging was based on Q-classification. The tests to determine rock strength and deformation properties were made with a Rock Tester-equipment. Difference Flow method was used for the determination of hydraulic conductivity in fractures and fractured zones in the borehole. The overlapping i.e. the detailed flow logging mode was used. The flow logging was performed with 0.5 m section length and with 0.1 m depth increments. Water loss tests (Lugeon tests) and a pressure build-up test were used to give background information for the grouting design. Geophysical borehole logging and optical imaging surveys of the pilot hole PH3 included the field work of all the surveys, the integration of the data as well as interpretation of the acoustic and borehole radar data. One of the objectives of the

  20. Numerical investigation of a novel connection in tempered glass using holes drilled after tempering

    DEFF Research Database (Denmark)

    Nielsen, Jens Henrik

    2013-01-01

    , the hole and the adhesive. In the paper a short discussion of the change in residual stresses due to the drilling and a FE-model for the loading of the pin in the hole is developed. From this model, the stress state occurring in such joints is investigated assuming both elastic and ideal plastic behaviour...

  1. Mineralogy of drill holes J-13, UE-25A No. 1, and USW G-1 at Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Bish, D.L.; Chipera, S.J.

    1986-09-01

    The mineralogy of drill holes J-13, UE-25A No. 1, and USW G-1 was previously determined using qualitative and semiquantitative techniques, and most of the available data were neither complete nor accurate. New quantitative x-ray diffraction data were obtained for rocks from all three of these drill holes at Yucca Mountain, Nevada. These quantitative analyses employed both external and internal standard x-ray powder diffraction methods and permitted the precise determination of all phases commonly found in the tuffs at Yucca Mountain, including glass and opal-CT. These new data supplant previous analyses and include numerous additional phases. New findings of particular importance include better constraints on the distribution of the more soluble silica polymorphs, cristobalite and opal-CT. Opal-CT was associated solely with clinoptilolite-bearing horizons, and cristobalite disappearance coincided with the appearance of analcime in USW G-1. Unlike previous analyses, we identified significant amounts of smectite in drill hole J-13. We found no evidence to support previous reports of the occurrence of erionite or phillipsite in these drill holes

  2. SMART MONITORING AND DECISION MAKING FOR REGULATING ANNULUS BOTTOM HOLE PRESSURE WHILE DRILLING OIL WELLS

    Directory of Open Access Journals (Sweden)

    M. P. Vega

    Full Text Available Abstract Real time measurements and development of sensor technology are research issues associated with robustness and safety during oil well drilling operations, making feasible the diagnosis of problems and the development of a regulatory strategy. The major objective of this paper is to use an experimental plant and also field data, collected from a basin operation, offshore Brazil, for implementing smart monitoring and decision making, in order to assure drilling inside operational window, despite the commonly observed disturbances that produce fluctuations in the well annulus bottom hole pressure. Using real time measurements, the performance of a continuous automated drilling unit is analyzed under a scenario of varying levels of rate of penetration; aiming pressure set point tracking (inside the operational drilling window and also rejecting kick, a phenomenon that occurs when the annulus bottom hole pressure is inferior to the porous pressure, producing the migration of reservoir fluids into the annulus region. Finally, an empirical model was built, using real experimental data from offshore Brazil basins, enabling diagnosing and regulating a real drilling site by employing classic and advanced control strategies.

  3. Ferroacryl mud for drilling deep bore holes

    Energy Technology Data Exchange (ETDEWEB)

    Lisyanskiy, V I; Chepiga, V I; Devydenko, V N

    1982-01-01

    The composition, technology of production and control of the parameters of a ferroacyl (FAR) mud for drilling for prospecting holes in the Donets-Basin are developed. The mud consists of Chasov Yal clay (150-160 kg), hypane (40 1), iron sulfate (1kg) and water (approximately 1 m/sup 3/). The mud exhibits the following parameters: density 1.05 -1.1 g/cm/sup 3/, viscosity 20-21 s; water yield 3-5 cm/sup 3/; crust 0.5 mm. Compared to existing flushing fluids based on hypane the FAR contains fewer components and the cost of the materials is considerably less. It features very high flocculating properties.

  4. Advanced Mud System for Microhole Coiled Tubing Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Kenneth Oglesby

    2008-12-01

    An advanced mud system was designed and key components were built that augment a coiled tubing drilling (CTD) rig that is designed specifically to drill microholes (less than 4-inch diameter) with advanced drilling techniques. The mud system was tailored to the hydraulics of the hole geometries and rig characteristics required for microholes and is capable of mixing and circulating mud and removing solids while being self contained and having zero discharge capability. Key components of this system are two modified triplex mud pumps (High Pressure Slurry Pumps) for advanced Abrasive Slurry Jetting (ASJ) and a modified Gas-Liquid-Solid (GLS) Separator for well control, flow return and initial processing. The system developed also includes an additional component of an advanced version of ASJ which allows cutting through most all materials encountered in oil and gas wells including steel, cement, and all rock types. It includes new fluids and new ASJ nozzles. The jetting mechanism does not require rotation of the bottom hole assembly or drill string, which is essential for use with Coiled Tubing (CT). It also has low reactive forces acting on the CT and generates cuttings small enough to be easily cleaned from the well bore, which is important in horizontal drilling. These cutting and mud processing components and capabilities compliment the concepts put forth by DOE for microhole coiled tubing drilling (MHTCTD) and should help insure the reality of drilling small diameter holes quickly and inexpensively with a minimal environmental footprint and that is efficient, compact and portable. Other components (site liners, sump and transfer pumps, stacked shakers, filter membranes, etc.. ) of the overall mud system were identified as readily available in industry and will not be purchased until we are ready to drill a specific well.

  5. Use of a Combination of Vertical and Horizontal Boreholes in Massive Blasting of Benches in the Surface Quarry Rodež

    Science.gov (United States)

    Tori, Matija; Vajović, Stanojle; Goleš, Niko; Muhić, Elvir; Peternel, Miha

    2017-12-01

    This article deals with the extraction of minerals (limestone/marl/flysch) in the quarry Rodež, which is located in western Slovenia. During the extraction of minerals in a quarry, drilling and blasting of benches are used. The focus of the article is on the analysis of the parameters related to drilling and blasting in surface excavations when using a combination of explosions and introducing horizontal wells along with vertical holes in the bench. On the basis of the analysis of basic parameters through a combination of drilling horizontal wells and charging those with the ammonal + Anfex explosive, analyses of effects of seismic disturbances on potentially affected buildings have also been conducted. The article is connected to and deals exclusively with the basic parameters of drilling and blasting, with the introduction of horizontal drilling and with the analysis of seismic measurements of threatened buildings in accordance with the German standard German Institute for Standardisation (DIN) 4150 during the use of a new method of blasting.

  6. Buffer mass test - Rock drilling and civil engineering

    International Nuclear Information System (INIS)

    Pusch, R.

    1982-09-01

    The buffer mass test (BMT) is being run in the former 'ventilation drift' in which a number of rock investigations were previously conducted. A number of vertical pilot holes were drilled from the tunnel floor to get information of the water inflow in possible heater hole position. The final decision of the location of the heater holes was then made, the main principle being that much water should be available in each hole with the possible exception of one of the holes. Thereafter, the diameter 0.76 m heater holes were drilled to a depth of 3-3.3 m. Additional holes were then drilled for rock anchoring of the lids of the four outer heater holes, for the rock mechanical investigation, as well as for a number of water pressure gauges. The inner, about 12 m long part of the tunnel, was separated from the outer by bulwark. The purpose of this construction was to confine a backfill, the requirements of the bulwark being to withstand the swelling pressure as well as the water pressure. Outside the bulwark an approximately 1.5-1.7 m thick concrete slab was cast on the tunnel floor, extending about 24.7 m from the bulwark. Boxing-outs with the same height as the slab and with the horizontal dimensions 1.8 x 1.8 m, were made and rock-anchored concrete lids were cast on top of them after backfilling. The slab which thus represents 'rock', also forms a basal support of the bulwark. The lids permits access to the backfill as well as to the underlying, highly compacted bentonite for rapid direct determination of the water distributin at the intended successive test stops. The construction of the slab and lids will be described in this report. (Author)

  7. Real-time positioning technology in horizontal directional drilling based on magnetic gradient tensor measurement

    Science.gov (United States)

    Deng, Guoqing; Yao, Aiguo

    2017-04-01

    Horizontal directional drilling (HDD) technology has been widely used in Civil Engineering. The dynamic position of the drill bit during construction is one of significant facts determining the accuracy of the trajectory of HDD. A new method now has been proposed to detecting the position of drill bit by measuring the magnetic gradient tensor of the ground solenoid magnetic beacon. Compared with traditional HDD positioning technologies, this new model is much easier to apply with lower request for construction sites and higher positioning efficiency. A direct current (DC) solenoid as a magnetic dipole is placed on ground near the drill bit, and related sensors array which contains four Micro-electromechanical Systems (MEMS ) tri-axial magnetometers, one MEMS tri-axial accelerometer and one MEMS tri-axial gyroscope is set up for measuring the magnetic gradient tensor of the magnetic dipole. The related HDD positioning model has been established and simulation experiments have been carried out to verify the feasibility and reliability of the proposed method. The experiments show that this method has good positioning accuracy in horizontal and vertical direction, and totally avoid the impact of the environmental magnetic field. It can be found that the posture of the magnetic beacon will impact the remote positioning precision within valid positioning range, and the positioning accuracy is higher with longer baseline for limited space in drilling tools. The results prove that the relative error can be limited in 2% by adjusting position of the magnetic beacon, the layers of the enameled coil, the sensitive of magnetometers and the baseline distance. Conclusion can be made that this new method can be applied in HDD positioning with better effect and wider application range than traditional method.

  8. An experimental result of surface roughness machining performance in deep hole drilling

    Directory of Open Access Journals (Sweden)

    Mohamad Azizah

    2016-01-01

    Full Text Available This study presents an experimental result of a deep hole drilling process for Steel material at different machining parameters which are feed rate (f, spindle speed (s, the depth of the hole (d and MQL, number of drops (m on surface roughness, Ra. The experiment was designed using two level full factorial design of experiment (DoE with centre points to collect surface roughness, Ra values. The signal to noise (S/N ratio analysis was used to discover the optimum level for each machining parameters in the experiment.

  9. Study of a pipe-scanning robot for use in post-construction evaluation during horizontal directional drilling.

    Science.gov (United States)

    2015-06-01

    Trenchless Technology has become an increasingly popular underground utility construction method, beginning in : the early 1900s with pipe jacking beneath railroad lines. One method, horizontal directional drilling (HDD), became : more common in the ...

  10. A drill-hole geodatabase as a tool to investigate geological hazard in Napoli Urban Area

    Science.gov (United States)

    Albericoa, I.; Lirer, L.; Petrosino, P.

    2003-04-01

    Geological investigations in urban areas are complicated by the absence of good outcrops and field exposures, as a result of the density of civil buildings and railway and road network. On the other side, in urban areas geological investigation represents a basic tool to decisional support for the management of present private buildings and public works and for the planning of new ones. This is much more true in urban areas very exposed to geological hazard (volcanic, hydrogeological, seismic) where the high exposed value greatly rises the risk. The methodology to deal with the geological hazard in urban areas here presented is the reconstruction of buried geological formations deduced by drill-holes stratigraphy.The test area is represented by the whole municipality of Napoli city, that proves very apt to the investigation of the hazard in urban areas since it stands over an active volcanic area, comprised between the Campi Flegrei volcanic field and the Somma-Vesuvio district, that both gave explosive and effusive activity through the last centuries. Besides, the extension of the main part of the city constrained between the coastline and the belt of volcanic hills together with the presence of loose material due to pyroclastic activity makes the alluvional events an other hazardous phenomenon for the city. The performed up datable drill-holes geodata-base for the city of Napoli at present contains the record of about 800 holes stratigraphy, collected through the main public and private bodies, reflecting the drill-holes surveys made along the last 50 years before constructing the main railways, roads and aqueduct network. Drill-holes data have been interpreted and can now be read under various viewpoints (geological, lithological, volcanological); the present work presents the first results of the geological hazard investigation. The investigation of buried stratigraphy in the eastern area allows to identify the presence of pyroclastic flow deposits from Somma

  11. An accurate estimation and optimization of bottom hole back pressure in managed pressure drilling

    Directory of Open Access Journals (Sweden)

    Boniface Aleruchi ORIJI

    2017-06-01

    Full Text Available Managed Pressure Drilling (MPD utilizes a method of applying back pressure to compensate for wellbore pressure losses during drilling. Using a single rheological (Annular Frictional Pressure Losses, AFPL model to estimate the backpressure in MPD operations for all sections of the well may not yield the best result. Each section of the hole was therefore treated independently in this study as data from a case study well were used. As the backpressure is a function of hydrostatic pressure, pore pressure and AFPL, three AFPL models (Bingham plastic, Power law and Herschel Bulkley models were utilized in estimating the backpressure. The estimated backpressure values were compared to the actual field backpressure values in order to obtain the optimum backpressure at the various well depths. The backpressure values estimated by utilizing the power law AFPL model gave the best result for the 12 1/4" hole section (average error % of 1.855% while the back pressures estimated by utilizing the Herschel Bulkley AFPL model gave the best result for the 8 1/2" hole section (average error % of 12.3%. The study showed that for hole sections of turbulent annular flow, the power law AFPL model fits best for estimating the required backpressure while for hole sections of laminar annular flow, the Herschel Bulkley AFPL model fits best for estimating the required backpressure.

  12. Influence of Cutting Parameters on the Surface Roughness and Hole Diameter of Drilling Making Parts of Alluminium Alloy

    Directory of Open Access Journals (Sweden)

    Andrius Stasiūnas

    2013-02-01

    Full Text Available The article researches the drilling process of an aluminium alloy. The paper is aimed at analyzing the influence of cutting speed, feed and hole depth considering hole diameter and hole surface roughness of aluminum alloy 6082 in the dry drilling process and at making empirical formulas for cutting parameters. The article also describes experimental techniques and equipment, tools and measuring devices. Experimental studies have been carried out using different cutting parameters. The obtained results have been analyzed using computer software. According to the existing techniques for measuring, surface roughness and hole diameters have been measured, empirical models have been created and the results of the conducted experiments have been inspected. The findings and recommendations are presented at the end of the work.Artcile in Lithuanian

  13. Changing the fundamentals[Drill technology

    Energy Technology Data Exchange (ETDEWEB)

    Flatern, R. von

    2003-02-01

    Evolution of the science of drilling oil and gas wells has evolved in fits and starts. From drilling with cables to rotary tables to top drives, from straight holes to horizontal, it has been a process interrupted occasionally by flashes of revolutionary brilliance. In this article the author looks at the state of just a few of the technologies that define or threaten to change how drillers go about their business. In the early days of deepwater exploration drillers responded more to technical challenges than financial ones, primarily with immense semisubmersibles and drillships, together with all he necessary ancillary items. The goal of getting deeper faster is not a new one, better performance bits, muds, LWD and MWD, together with numerous other developments all emerged as a result of the desire to shorten the time between spud and TD. But whereas saving a day or two drilling onshore or nearshore is desirable, it has never before been possible to realize the kind of substantial financial benefits from relatively small time savings. Research and development into these type of savings with the design and improvement of different types drill bits and casing drilling is described.

  14. Advanced Drilling through Diagnostics-White-Drilling

    International Nuclear Information System (INIS)

    FINGER, JOHN T.; GLOWKA, DAVID ANTHONY; LIVESAY, BILLY JOE; MANSURE, ARTHUR J.; PRAIRIE, MICHAEL R.

    1999-01-01

    A high-speed data link that would provide dramatically faster communication from downhole instruments to the surface and back again has the potential to revolutionize deep drilling for geothermal resources through Diagnostics-While-Drilling (DWD). Many aspects of the drilling process would significantly improve if downhole and surface data were acquired and processed in real-time at the surface, and used to guide the drilling operation. Such a closed-loop, driller-in-the-loop DWD system, would complete the loop between information and control, and greatly improve the performance of drilling systems. The main focus of this program is to demonstrate the value of real-time data for improving drilling. While high-rate transfer of down-hole data to the surface has been accomplished before, insufficient emphasis has been placed on utilization of the data to tune the drilling process to demonstrate the true merit of the concept. Consequently, there has been a lack of incentive on the part of industry to develop a simple, low-cost, effective high-speed data link. Demonstration of the benefits of DWD based on a high-speed data link will convince the drilling industry and stimulate the flow of private resources into the development of an economical high-speed data link for geothermal drilling applications. Such a downhole communication system would then make possible the development of surface data acquisition and expert systems that would greatly enhance drilling operations. Further, it would foster the development of downhole equipment that could be controlled from the surface to improve hole trajectory and drilling performance. Real-time data that would benefit drilling performance include: bit accelerations for use in controlling bit bounce and improving rock penetration rates and bit life; downhole fluid pressures for use in the management of drilling hydraulics and improved diagnosis of lost circulation and gas kicks; hole trajectory for use in reducing directional

  15. A comprehensive literature review reflecting fifteen years of debate regarding the representativity of reverse circulation vs blast hole drill sampling

    DEFF Research Database (Denmark)

    Engström, Karin

    2017-01-01

    Blast hole sampling is widely used for grade control by the mining industry all over the world, both in precious and base metal open pit mining. Blast hole (BH) samples are often regarded as inferior in comparison to “proper drill sampling” like reverse circulation (RC) and diamond (core) drilling...... (DD), and are accused of lacking representativity by the sampling community. The present paper aims at collecting all peer reviewed publications from 2000 onwards that concern open pit mine sampling performance of BH, RC and/or DD drill sampling. This will form a comprehensive literature review...

  16. Modeling the time and cost to drill an offshore well

    International Nuclear Information System (INIS)

    Kaiser, Mark J.

    2009-01-01

    The objective in drilling a hydrocarbon well is to make hole as quickly as possible subject to the technological, operational, quality, and safety constraints associated with the process. These objectives are frequently conflicting and depend on factors that are subject to significant private and market uncertainty. There is no way to identify all of the relevant characteristics of drilling operations, but through use of statistical analysis and empirical modeling, it is possible to develop relations that characterize and benchmark drilling performance under a suitable set of assumptions. The purpose of this paper is to develop the conceptual framework to model the time and cost to drill an offshore well and to illustrate the methodology on a test set of wells in the Gulf of Mexico. The physical characteristics of the wellbore and operational aspects of drilling, including variables such as the drilled interval, horizontal displacement, aspect ratio, number of casing strings, and mud weight, serve as the primary descriptive factors in the functional relations constructed.

  17. Slant rigs offer big payoffs in shallow drilling

    International Nuclear Information System (INIS)

    Smith, J.; Edwards, B.

    1992-01-01

    Slant hole drilling technology can result in considerable savings over conventionally drilled deviated holes because mud motors and deviation control with measurement while drilling tools are usually unnecessary. The benefits of using slant hole rigs for development drilling improve after the bit walk tendencies and the correct bottom hole assemblies have been determined for a particular area. This article discusses three recent drilling operations that successfully used slant drilling technology on land-based projects: drilling for heavy oil in Alberta, drilling for gas in Alberta, and drilling a river crossing for a gas pipeline in British Columbia. These examples demonstrate the flexibility of slant drilling technology

  18. Use of a Combination of Vertical and Horizontal Boreholes in Massive Blasting of Benches in the Surface Quarry Rodež

    Directory of Open Access Journals (Sweden)

    Tori Matija

    2017-12-01

    Full Text Available This article deals with the extraction of minerals (limestone/marl/flysch in the quarry Rodež, which is located in western Slovenia. During the extraction of minerals in a quarry, drilling and blasting of benches are used. The focus of the article is on the analysis of the parameters related to drilling and blasting in surface excavations when using a combination of explosions and introducing horizontal wells along with vertical holes in the bench. On the basis of the analysis of basic parameters through a combination of drilling horizontal wells and charging those with the ammonal + Anfex explosive, analyses of effects of seismic disturbances on potentially affected buildings have also been conducted. The article is connected to and deals exclusively with the basic parameters of drilling and blasting, with the introduction of horizontal drilling and with the analysis of seismic measurements of threatened buildings in accordance with the German standard German Institute for Standardisation (DIN 4150 during the use of a new method of blasting.

  19. Inspection of drilled well at the Borgen school in Asker community, Akershus

    International Nuclear Information System (INIS)

    Elvebakk, Harald

    2001-01-01

    A drill hole inspection is carried out with an optical telemetric reviewer at logged temperatures, electric conductivity and natural gamma radiation in a 165 m deep drilled well at the Borgen school. The aim of the logging was to obtain data for evaluating the geothermal potential of the well. The optical logging shows that the rock (shale, siltstone and noduled lime) generally is only slightly cracked.. The temperature log shows only slight temperature increment, 0.56 o C/100 m, down to about a depth of 100 m. From 100 m the temperature gradient increases to 0.98 o C/100 m and the temperature is about 6.8 o C at a depth of 160 m. A marked increase from 160 m may indicate a water flux at this depth. An observed crack in the optical log at the same depth confirm that this may be the case. The conductivity is constant and low, about 225 microsec/cm, along the entire drill hole except for the top 6 m of the hole where it is lower. The natural gamma radiation is at a low level, about 75 cps, along the entire hole. A marked decrease between 60 and 70 m indicates another rock type, chalk enriched sandstone, which probably has somewhat lower potassium content than the rest of the hole. The deviation measurement shows that the hole turns towards north west with a horizontal deviation of 21 m at the bottom

  20. Early Detection and Localization of Downhole Incidents in Managed Pressure Drilling

    DEFF Research Database (Denmark)

    Willersrud, Anders; Imsland, Lars; Blanke, Mogens

    2015-01-01

    Downhole incidents such as kick, lost circulation, pack-off, and hole cleaning issues are important contributors to downtime in drilling. In managed pressure drilling (MPD), operations margins are typically narrower, implying more frequent incidents and more severe consequences. Detection...... and handling of symptoms of downhole drilling contingencies at an early stage are therefore crucial for the reliability and safety of MPD operations. In this paper we describe a method for early detection and localization of such incidents, based on a fit for purpose model of the downhole pressure hydraulics...... successfully been tested on experimental data from a medium-scale horizontal flow loop in Sta- vanger, Norway. The flow loop represents a 700 m borehole with emulation of the following downhole contingencies: drillstring washout, drill bit nozzle plugging, gas influx and fluid loss. In the tests...

  1. Density of basalt core from Hilo drill hole, Hawaii

    Science.gov (United States)

    Moore, J.G.

    2001-01-01

    Density measurements of 1600 samples of core from 889 to 3097 m depth below sea level in the Hawaii Scientific Drilling Program hole near Hilo, Hawaii show marked differences between the basaltic rock types and help define stratigraphy in the hole. Water-saturated densities of subaerial lava flows (occurring above 1079 m depth) have the broadest range because of the large density variation within a single lava flow. Water-saturated densities commonly range from 2.0 to 3.0 with an average of 2.55 ?? 0.24 g/cc. Dikes and sills range from 2.8 to 3.1 g/cc). Densities of hyaloclastite commonly range from 2.3 to 2.7, with an overall average of about 2.5 g/cc. The low-density of most hyaloclastite is due primarily to palagonitization of abundant glass and presence of secondary minerals in the interstices between fragments. Four principal zones of pillow lava, separated by hyaloclastite, occur in the drill core. The shallowest (1983-2136 m) is paradoxically the densest, averaging 3.01 ?? 0.10 g/cc. The second (2234-2470 m) is decidedly the lightest, averaging 2.67 ?? 0.13 g/cc. The third (2640-2790 m) and fourth (2918-bottom at 3097 m) are high, averaging 2.89 ?? 0.17 and 2.97 ?? 0.08 g/cc, respectively. The first pillow zone includes degassed pillows i.e. lava erupted on land that flowed into the sea. These pillows are poor in vesicles, because the subaerial, one-atmosphere vesicles were compressed when the flow descended to deeper water and higher pressure. The second (low-density, non-degassed) pillow zone is the most vesicle-rich, apparently because it was erupted subaqueously at a shallow depth. The higher densities of the third and fourth zones result from a low vesicularity of only a few percent and an olivine content averaging more than 5% for the third zone and about 10% for the fourth zone. The uppermost hyaloclastite extending about 400 m below the bottom of the subaerial basalt is poorly cemented and absorbs up to 6 wt% of water when immersed. Progressing

  2. Improving Coolant Effectiveness through Drill Design Optimization in Gundrilling

    Science.gov (United States)

    Woon, K. S.; Tnay, G. L.; Rahman, M.

    2018-05-01

    Effective coolant application is essential to prevent thermo-mechanical failures of gun drills. This paper presents a novel study that enhances coolant effectiveness in evacuating chips from the cutting zone using a computational fluid dynamic (CFD) method. Drag coefficients and transport behaviour over a wide range of Reynold numbers were first established through a series of vertical drop tests. With these, a CFD model was then developed and calibrated with a set of horizontal drilling tests. Using this CFD model, critical drill geometries that lead to poor chip evacuation including the nose grind contour, coolant hole configuration and shoulder dub-off angle in commercial gun drills are identified. From this study, a new design that consists a 20° inner edge, 15° outer edge, 0° shoulder dub-off and kidney-shaped coolant channel is proposed and experimentally proven to be more superior than all other commercial designs.

  3. STATE OF THE ART OF DRILLING LARGE DIAMETER BOREHOLES FOR DEPOSITION OF HIGH LEVEL WASTE AND SPENT NUCLEAR FUEL

    Directory of Open Access Journals (Sweden)

    Trpimir Kujundžić

    2012-07-01

    Full Text Available Deep geological disposal is internationally recognized as the safest and most sustainable option for the long-term management of high-level radioactive waste. Mainly, clay rock, salt rock and crystalline rock are being considered as possible host rocks. Different geological environment in different countries led to the various repository concepts. Main feature of the most matured repository concept is that canisters with spent nuclear fuel are emplaced in vertical or horizontal large diameter deposition holes. Drilling technology of the deposition holes depends on repository concept and geological and geomechanical characteristics of the rock. The deposition holes are mechanically excavated since drill & blast is not a possible method due to requirements on final geometry like surface roughness etc. Different methods of drilling large diameter boreholes for deposition of high-level waste and spent nuclear fuel are described. Comparison of methods is made considering performance and particularities in technology.

  4. Study of the location of testing area in residual stress measurement by Moiré interferometry combined with hole-drilling method

    Science.gov (United States)

    Qin, Le; Xie, HuiMin; Zhu, RongHua; Wu, Dan; Che, ZhiGang; Zou, ShiKun

    2014-04-01

    This paper investigates the effect of the location of testing area in residual stress measurement by Moiré interferometry combined with hole-drilling method. The selection of the location of the testing area is analyzed from theory and experiment. In the theoretical study, the factors which affect the surface released radial strain ɛ r were analyzed on the basis of the formulae of the hole-drilling method, and the relations between those factors and ɛ r were established. By combining Moiré interferometry with the hole-drilling method, the residual stress of interference-fit specimen was measured to verify the theoretical analysis. According to the analysis results, the testing area for minimizing the error of strain measurement is determined. Moreover, if the orientation of the maximum principal stress is known, the value of strain will be measured with higher precision by the Moiré interferometry method.

  5. Report on televiewer log and stress measurements in core hole USW G-2, Nevada Test Site, October-November, 1982

    International Nuclear Information System (INIS)

    Stock, J.M.; Healy, J.H.; Hickman, S.H.

    1984-01-01

    Hydraulic fracturing stress measurements and a borehole televiewer log were obtained in hole USW G-2 at Yucca Mountain, Nevada, to depths of 1200 m. Results indicate that at the depths tested, the minimum ad maximum horizontal stresses are less than the vertical stress, corresponding to a normal faulting stress regime. Drilling-induced hydrofractures seen in the televiewer log imply a least horizontal principal stress direction of N 60 0 W to N 65 0 W. For reasonable values of the coefficient of friction, the magnitude of the least horizontal stress is close to the value at which slip would occur on preexisting faults of optimal orientation (strike N 25 0 E to N 30 0 E and dipping 60 0 to 67 0 ). The prominent drilling-induced fractures seen in the televiewer log are believed to have been caused by excess downhole pressures applied during drilling the hole. Many throughgoing fractures are also seen in the televiewer log; most of these are high angle, stringing N 10 0 E to N 40 0 E. These fractures show a general decrease in angle of dip with depth. Stress-induced wellbore breakouts are seen at depths below 1050 m. The average N 60 0 W azimuth of these breakouts agrees very closely with the N 60 0 W to N 65 0 W direction of least horizontal principal stress inferred from the drilling-induced hydrofracs. 19 references, 13 figures, 3 tables

  6. Preliminary geologic and geophysical data of the UE25a-3 exploratory drill hole, Nevada Test Site, Nevada

    International Nuclear Information System (INIS)

    Maldonado, F.; Muller, D.C.; Morrison, J.N.

    1979-09-01

    The UE25a-3 drill hole, located in the Calico Hills area, was drilled as part of an effort to evaluate the Calico Hills area as a possible nuclear waste repository site. The purpose of the drill hole was to verify the existence of an intrusive crystalline body in the subsurface and to determine the stratigraphy, structure, and nature of fractures of the cored rocks. Cored samples were obtained for mineral, chemical, and material property analyses. Numerous high-angle faults and brecciated zones were intersected by the drill hole. The units cored were intensely fractured with fracture analysis of the core consisting of frequency of fractures, dips of fractures, open and closed (sealed) fractures and types of fracture sealing or coating material. Twenty-four hundred and thirty fractures, representing approximately 30 percent of the fractures present, indicate an average fracture frequency of 13.2 fractures per meter, predominantly high-angle dips with 66 percent of the fractures closed. Fractures in the argillite interval are sealed or coated predominantly with kaolinite, nacrite, and dickite. Calcite, chlorite, and magnetite are present in fractures in the altered argillite interval. Fractures in the marble interval are sealed or coated with calcite, dolomite, and ferruginous clay. The core index indicates that the lower half of the drilled interval is more competent than the upper half. Borehole geophysical logs were run by the Birdwell Division of Seismograph Service Corporation for geologic correlations and lithologic characterizations. The logs include: caliper, density, resistivity, spontaneous potential, Vibroseis, 3-D velocity, neutron, and gamma-ray logs

  7. Detailed petrographic descriptions and microprobe data for drill holes USW-G2 and UE25b-1H, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Broxton, D.; Vaniman, D.; Caporuscio, F.; Arney, B.; Heiken, G.

    1982-10-01

    Drill holes USW-G2 and UE25b-1H at Yucca Mountain, Nevada penetrate a thick sequence of volcanic rocks consisting of voluminous ash-flow tuffs, intercalated with thin bedded tuffs and minor lavas. This report provides detailed petrologic descriptions that were summarized in an earlier report. Microprobe analyses of feldspars and mafic phenocrysts as well as secondary feldspars are tabulated for these drill holes for the first time in this report

  8. On-line depth measurement for laser-drilled holes based on the intensity of plasma emission

    Science.gov (United States)

    Ho, Chao-Ching; Chiu, Chih-Mu; Chang, Yuan-Jen; Hsu, Jin-Chen; Kuo, Chia-Lung

    2014-09-01

    The direct time-resolved depth measurement of blind holes is extremely difficult due to the short time interval and the limited space inside the hole. This work presents a method that involves on-line plasma emission acquisition and analysis to obtain correlations between the machining processes and the optical signal output. Given that the depths of laser-machined holes can be estimated on-line using a coaxial photodiode, this was employed in our inspection system. Our experiments were conducted in air under normal atmospheric conditions without gas assist. The intensity of radiation emitted from the vaporized material was found to correlate with the depth of the hole. The results indicate that the estimated depths of the laser-drilled holes were inversely proportional to the maximum plasma light emission measured for a given laser pulse number.

  9. Drill-hole data, drill-site geology, and geochemical data from the study of Precambrian uraniferous conglomerates of the Medicine Bow Mountains and Sierra Madre of southeastern Wyoming

    Energy Technology Data Exchange (ETDEWEB)

    Karlstrom, K.E.; Houston, R.S.; Schmidt, T.G.; Inlow, D.; Flurkey, A.J.; Kratochvil, A.L.; Coolidge, C.M.; Sever, C.K.; Quimby, W.F.

    1981-02-01

    This volume is presented as a companion to Volume 1: The Geology and Uranium Potential of Precambrian Conglomerates in the Medicine Bow Mountains and Sierra Madre of Southeastern Wyoming; and to Volume 3: Uranium Assessment for Precambrian Pebble Conglomerates in Southeastern Wyoming. Volume 1 summarized the geologic setting and geologic and geochemical characteristics of uranium-bearing conglomerates in Precambrian metasedimentary rocks of southeastern Wyoming. Volume 3 is a geostatistical resource estimate of U and Th in quartz-pebble conglomerates. This volume contains supporting geochemical data, lithologic logs from 48 drill holes in Precambrian rocks of the Medicine Bow Mountains and Sierra Madre, and drill site geologic maps and cross-sections from most of the holes.

  10. Drill-hole data, drill-site geology, and geochemical data from the study of Precambrian uraniferous conglomerates of the Medicine Bow Mountains and Sierra Madre of southeastern Wyoming

    International Nuclear Information System (INIS)

    Karlstrom, K.E.; Houston, R.S.; Schmidt, T.G.; Inlow, D.; Flurkey, A.J.; Kratochvil, A.L.; Coolidge, C.M.; Sever, C.K.; Quimby, W.F.

    1981-02-01

    This volume is presented as a companion to Volume 1: The Geology and Uranium Potential of Precambrian Conglomerates in the Medicine Bow Mountains and Sierra Madre of Southeastern Wyoming; and to Volume 3: Uranium Assessment for Precambrian Pebble Conglomerates in Southeastern Wyoming. Volume 1 summarized the geologic setting and geologic and geochemical characteristics of uranium-bearing conglomerates in Precambrian metasedimentary rocks of southeastern Wyoming. Volume 3 is a geostatistical resource estimate of U and Th in quartz-pebble conglomerates. This volume contains supporting geochemical data, lithologic logs from 48 drill holes in Precambrian rocks of the Medicine Bow Mountains and Sierra Madre, and drill site geologic maps and cross-sections from most of the holes

  11. A Comprehensive Comparison Study of Empirical Cutting Transport Models in Inclined and Horizontal Wells

    Directory of Open Access Journals (Sweden)

    Asep Mohamad Ishaq Shiddiq

    2017-07-01

    Full Text Available In deviated and horizontal drilling, hole-cleaning issues are a common and complex problem. This study explored the effect of various parameters in drilling operations and how they affect the flow rate required for effective cutting transport. Three models, developed following an empirical approach, were employed: Rudi-Shindu’s model, Hopkins’, and Tobenna’s model. Rudi-Shindu’s model needs iteration in the calculation. Firstly, the three models were compared using a sensitivity analysis of drilling parameters affecting cutting transport. The result shows that the models have similar trends but different values for minimum flow velocity. Analysis was conducted to examine the feasibility of using Rudi-Shindu’s, Hopkins’, and Tobenna’s models. The result showed that Hopkins’ model is limited by cutting size and revolution per minute (RPM. The minimum flow rate from Tobenna’s model is affected only by well inclination, drilling fluid weight and drilling fluid rheological property. Meanwhile, Rudi-Shindu’s model is limited by inclinations above 45°. The study showed that the investigated models are not suitable for horizontal wells because they do not include the effect of lateral section.

  12. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    Energy Technology Data Exchange (ETDEWEB)

    Andersson, O [VBB VIAK AB, Malmoe (Sweden)

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs.

  13. Deep drilling KLX 02. Drilling and documentation of a 1700 m deep borehole at Laxemar, Sweden

    International Nuclear Information System (INIS)

    Andersson, O.

    1994-08-01

    In this report the preparation and execution of the deep core drilling KLX 02 is described. The hole was drilled with the wireline methods, NQ dimension (diameter 76 mm), to a final depth of 1700.5 m. Prior to core drilling a diameter 215 mm pilot hole was pre drilled to 200 m with controlled hammer drilling (DTH). In this hole casing and air-lift equipment was installed with the aim to support the circulation of drilling fluid. During core drilling there was a measurement of major drilling parameters and drilling fluid in and out of hole. As a fluid tracer uranine was used. Each 300 m of core drilling air-lift pump tests were performed. After completion a flow-meter log was run to finalize the project phase. It can be concluded that both the pre drilling and core drilling methods used proved to be successful. No severe technical problem occurred. However, potential risks have been pointed at in the report. The air-lift system functioned only partly and has to be modified for further use. Also the technique for monitoring of drilling parameters needs improvement as does the method for air-lift pump tests with packer. The organisation model for planning and realization functioned satisfactory and can be recommended for similar future projects. 9 refs, numerous tabs and figs

  14. Geology of drill hole USW VH-2, and structure of Crater Flat, southwestern Nevada

    International Nuclear Information System (INIS)

    Carr, W.J.; Parrish, L.D.

    1985-01-01

    A 1219 meter (4000 ft) drill hole in Crater Flat shows the absence of buried Pliocene or Quaternary volcanic rocks, and penetrates a section of Timber Mountain, Paintbrush, and the upper part of the Crater Flat Tuffs, similar to that exposed adjacent to Crater Flat. A prominent negative aeromagnetic anomaly between the drill hole and Bare Mountain is attributed to a westward thickening section of a reversely magnetized Miocene basalt. The relatively shallow depth of this basalt in the west-central part of Crater Flat indicates that no large amount of tectonic movement has occurred in approximately the last 10 m.y. Massive brecciated wedges of Paleozoic rocks are penetrated in two stratigraphic intervals in the drill hole; the older one, between the Tiva Canyon Member of the Paintbrush Tuff and the Rainier Mesa Member of the Timber Mountain Tuff, correlates with the time of maximum faulting east of Crater Flat in the Yucca Mountain area. The younger slide masses are correlated with a large slide block of probable late Miocene age exposed along the southwestern rim of Crater Flat. The structural pattern and style buried beneath central and western Crater Flat is deduced to be similar to that exposed at Yucca Mountain, but less developed. The major fault system controlling the steep east face of Bare Mountain, though probably still active, is believed to have developed mainly as a result of caldera collapse between 13 and 14 m.y. ago. Relations between faulting and four episodes of basalt eruption in the Crater Flat area strongly suggest contemporaneity of the two processes. 17 refs., 2 figs., 3 tabs

  15. Analysis of the custom design/fabrication/testing requirements for a large-hole drilling machine for use in an underground radioactive waste repository

    International Nuclear Information System (INIS)

    Grams, W.H.; Gnirk, P.F.

    1976-01-01

    This report presents an analysis of the fabrication and field test requirements for a drilling machine that would be applicable to the drilling of large diameter holes for the emplacement of radioactive waste canisters in an underground repository. On the basis of a previous study in 1975 by RE/SPEC Inc. for the Oak Ridge National Laboratory, it was concluded that none of the commercially available machines were ideally suited for the desired drilling application, and that it was doubtful whether a machine with the required capabilities would become available as a standard equipment item. The results of the current study, as presented herein, provide a definitive basis for selecting the desired specifications, estimating the design, fabrication, and testing costs, and analyzing the cost-benefit characteristics of a custom-designed drilling machine for the emplacement hole drilling task

  16. Drilling the near cortex with elongated figure-of-8 holes to reduce the stiffness of a locking compression plate construct.

    Science.gov (United States)

    Chen, Jerry Yongqiang; Zhou, Zhihong; Ang, Benjamin Fu Hong; Yew, Andy Khye Soon; Chou, Siaw Meng; Chia, Shi-Lu; Koh, Joyce Suang Bee; Howe, Tet Sen

    2015-12-01

    To compare the stiffness of locking compression plate (LCP) constructs with or without drilling the near cortex with elongated figure-of-8 holes. 24 synthetic bones were sawn to create a 10-mm gap and were fixed with a 9-hole 4.5-mm narrow LCP. In 12 bones, the near cortex of the adjacent holes to the LCP holes was drilled to create elongated figure-of-8 holes before screw insertion. The stiffness of LCP constructs under axial loading or 4-point bending was assessed by (1) dynamic quasi-physiological testing for fatigue strength, (2) quasi-static testing for stiffness, and (3) testing for absolute strength to failure. None of the 24 constructs had subcatastrophic or catastrophic failure after 10 000 cycles of fatigue loading (p=1.000). The axial stiffness reduced by 16% from 613±62 to 517±44 N/mm (p=0.012) in the case group, whereas the bending stiffness was 16±1 Nm2 in both groups (p=1.000). The maximum axial load to catastrophic failure was 1596±84 N for the control group and 1627±48 N for the case group (p=0.486), whereas the maximum bending moment to catastrophic failure was 79±12 and 80±10 Nm, respectively (p=0.919). Drilling the near cortex with elongated figure-of-8 holes reduces the axial stiffness of the LCP construct, without compromising its bending stiffness or strength.

  17. Borehole gravity meter survey in drill hole USW G-4, Yucca Mountain Area, Nye County, Nevada

    International Nuclear Information System (INIS)

    Healey, D.L.; Clutsom, F.G.; Glover, D.A.

    1986-01-01

    Drill hole USW G-4 was logged with the US Geological Survey borehole gravity meter (BHGM) BH-6 as part of a detailed study of the lithostratigraphic units penetrated by this hole. Because the BHGM measures a larger volume of rock than the conventional gamma-gamma density tool, it provides an independent and more accurate measurement of the in situ average bulk density of thick lithologic units. USW G-4 is an especially important hole because of its proximity to the proposed exploratory shaft at Yucca Mountain. The BHGM data were reduced to interval densities using a free-air gradient (F) of 0.3083 mGal./m (0.09397 mGal/ft) measured at the drill site. The interval densities were further improved by employing an instrument correction factor of 1.00226. This factor was determined from measurements obtained by taking gravity meter BH-6 over the Charleston Peak calibration loop. The interval density data reported herein, should be helpful for planning the construction of the proposed shaft

  18. Heat accumulation during sequential cortical bone drilling.

    Science.gov (United States)

    Palmisano, Andrew C; Tai, Bruce L; Belmont, Barry; Irwin, Todd A; Shih, Albert; Holmes, James R

    2016-03-01

    Significant research exists regarding heat production during single-hole bone drilling. No published data exist regarding repetitive sequential drilling. This study elucidates the phenomenon of heat accumulation for sequential drilling with both Kirschner wires (K wires) and standard two-flute twist drills. It was hypothesized that cumulative heat would result in a higher temperature with each subsequent drill pass. Nine holes in a 3 × 3 array were drilled sequentially on moistened cadaveric tibia bone kept at body temperature (about 37 °C). Four thermocouples were placed at the center of four adjacent holes and 2 mm below the surface. A battery-driven hand drill guided by a servo-controlled motion system was used. Six samples were drilled with each tool (2.0 mm K wire and 2.0 and 2.5 mm standard drills). K wire drilling increased temperature from 5 °C at the first hole to 20 °C at holes 6 through 9. A similar trend was found in standard drills with less significant increments. The maximum temperatures of both tools increased from drill sizes was found to be insignificant (P > 0.05). In conclusion, heat accumulated during sequential drilling, with size difference being insignificant. K wire produced more heat than its twist-drill counterparts. This study has demonstrated the heat accumulation phenomenon and its significant effect on temperature. Maximizing the drilling field and reducing the number of drill passes may decrease bone injury. © 2015 Orthopaedic Research Society. Published by Wiley Periodicals, Inc.

  19. The interpretation of geochemical logs from the oceanic basement: mineral modelling in Ocean Drilling Program (ODP) Hole 735B

    International Nuclear Information System (INIS)

    Harvey, P.K.; Lovell, M.A.; Bristow, J.F.

    1991-01-01

    Leg 118 of the Ocean Drilling Program was carried out in the vicinity of the Southwest Indian Ridge. Of the boreholes drilled, by far the most important and scientifically spectacular is Hole 735B which was located on a shallow platform adjacent to the Atlantis II Transform. This hole penetrates some 500 m of gabbroic rocks representing Layer 3 of the oceanic crust. The recovered gabbros show considerable variation both in mineralogy and in the degree of deformation. Core recovery averages 87% and there is excellent control and correlation between the core and the wide range of logs obtained. Mineralogy logs are derived and presented using both core sample data and downhole geochemical logs for Hole 735B. The problems of transforming these data for the particular mineralogy encountered are discussed. (Author)

  20. Listvenite logging on D/V CHIKYU: Hole BT1B, Oman Drilling Project

    Science.gov (United States)

    Kelemen, P. B.; Beinlich, A.; Morishita, T.; Greenberger, R. N.; Johnson, K. T. M.; Lafay, R.; Michibayashi, K.; Harris, M.; Phase I Science Party, T. O. D. P.

    2017-12-01

    Listvenite, quartz-carbonate altered ultramafic rock containing minor fuchsite (Cr-muscovite) forms by complete carbonation of peridotite and is thus an attractive objective for carbon mitigation studies. However, reaction controls and evolution of listvenite are still enigmatic. Here we present the first results of Phase 1 of the ICDP (International Continental Drilling Program) Oman Drilling Project and subsequent core logging using the analytical facilities on board the research vessel D/V CHIKYU. Hole BT1B contains 300 m of continuous drill core intersecting alluvium, listvenite-altered serpentinite, serpentinite, ophicarbonate and the underlying metamorphic sole of the Semail ophiolite, Oman. The drill core has been systematically investigated by visual core description, thin section petrography, X-ray fluorescence core logging, X-ray diffractometry, visible-shortwave infrared imaging spectroscopy and X-ray Computer Tomography. Our observations show that listvenite is highly variable in texture and color on the mm to m scale. Listvenite was visually categorized into 5 principal color groups: the dominant dark red (47 %), light red (19 %), orange (14 %), pale (2 %) and green (16 %). The presence of hematite/goethite results in dark reddish, red and orange hues. Light grey or pale colored listvenite lacks hematite and/or goethite veins and may represent the `true' listvenite. Green listvenite is characterized by the presence of cm-sized quartz-fuchsite intergrowths. Five zones of serpentinite, which vary in thickness between several tens of cm and 4 m, are intercalated within the massive listvenite of Hole BT1B. Gradational listvenite-serpentinite transition zones contain the ophicarbonate assemblage (magnesite + serpentine) and sometimes additional talc, representing intermediate carbonation reaction progress. Preservation of the former mesh texture and bastite after orthopyroxene in the listvenite suggest that the listvenite precursor had already been

  1. Gradient index metamaterials realized by drilling hole arrays

    International Nuclear Information System (INIS)

    Mei Zhonglei; Cui Tiejun; Bai Jing

    2010-01-01

    Gradient index metamaterials have wide applications in the microwave and optical fields. Based on the quasi-static theory, such materials at the microwave band have been realized by drilling hole arrays on ordinary dielectric materials. As applications of the gradient index metamaterials, novel devices including a 45 0 dielectric wave-bending structure, a 16 0 wave-steering lens and a microwave focusing lens are designed and fabricated. Field mapping measurements validate the proposed gradient index metamaterials and the device designs. The method can be directly and easily extended to the design of cloaks, various lenses, beam shifters and beam-steering devices. It can also be applied in the optical band as long as quasi-static conditions are satisfied. The method and the devices may find applications in integrated circuit systems.

  2. Deep-Time drilling in the Australian Archean: the Agouron Institute geobiological drilling project. (Invited)

    Science.gov (United States)

    Buick, R.

    2010-12-01

    The Agouron Institute has sponsored deep-time drilling across the South African Archean-Proterozoic boundary, investigating the rise of oxygen over an onshore-offshore environmental transect. It is now supporting a drilling program in the Australian Archean of the Pilbara Craton, addressing a similar theme but with the added goal of resolving controversy over the age and origin of hydrocarbon biomarker molecules in ancient kerogenous shales. As these have been claimed to provide evidence for the evolution of oxygenic photosynthesis long before the rise of atmospheric oxygen to persistently high levels during the ~2.3 Ga “Great Oxidation Event”, their syngenesis with their host shales is thus of critical importance for the interpretation of Earth’s early oxygenation history. During the first drilling season, 3 holes were drilled using techniques and equipment to minimize organic geochemical contamination (new drill-string components cleaned before drilling potentially biomarker-bearing rocks, pre-contamination of drilling fluid with a synthetic organic compound of similar geochemical characteristics to biomarkers, sterile cutting and storage of samples immediately upon retrieval from the core-barrel). The initial hole was a blank control for organic geochemistry, drilled into rocks too metamorphosed to retain biomarker molecules. These rocks, cherts, carbonates and pelites of the 3.52 Ga Coucal Formation, Coonterunah Group, have been metamorphosed to upper greenschist facies at temperatures near 500°C and so should have had any ancient soluble hydrocarbons destroyed. However, because they contain both carbonate and organic carbon, these rocks can instead provide isotopic information about the earliest evolution of biological metabolism as they possess residues of both the reactant and product sides of the carbon-fixation reaction. The second hole sampled an on-shore section of carbonates and kerogenous shales in the ~2.65 Ga Carawine Dolomite and Lewin Shale

  3. Methodology for definition of bending radius and pullback force in HDD (Horizontal Directional Drilling) operations

    Energy Technology Data Exchange (ETDEWEB)

    Silva, Danilo Machado L. da; Rodrigues, Marcos V. [Det Norske Veritas (DNV), Rio de Janeiro, RJ (Brazil); Venaas, Asle [Det Norske Veritas (DNV), Oslo (Norway); Medeiros, Antonio Roberto de [Subsea 7 (Brazil)

    2009-12-19

    Bending is a primary loading experienced by pipelines during installation and operation. Significant bending in the presence of tension is experienced during installation by the S-lay method, as the pipe conforms to the curvature of the stinger and beyond in the over bend region. Bending in the presence of external pressure is experienced in the sag bend of all major installation methods (e.g., reeling, J-lay, S-lay) as well as in free-spans on the sea floor. Bending is also experienced by pipelines during installation by horizontal directional drilling. HDD procedures are increasingly being utilized around the world not only for crossings of rivers and other obstacles but also for shore approach of offshore pipelines. During installation the pipeline experience a combination of tensile, bending, and compressive stresses. The magnitude of these stresses is a function of the approach angle, bending radius, pipe diameter, length of the borehole, and the soil properties at the site. The objective of this paper is to present an overview of some aspects related to bending of the product pipe during HDD operations, which is closely related to the borehole path as the pipeline conforms to the curvature of the hole. An overview of the aspects related to tensile forces is also presented. The combined effect of bending and tensile forces during the pullback operation is discussed. (author)

  4. Growth in the measurement-while-drilling sector continues

    International Nuclear Information System (INIS)

    Hall, G.T.

    1991-01-01

    This book reports that the measurement while drilling (MWD) market is showing some of the most impressive growth in the oil field. Tremendous improvements in the reliability and capability of MWD tools have spurred the expansion of this market. During 1990, the worldwide MWD market expanded by 48%, rising from $250 million in 1989 to $370 million in 1990. The MWD market should expand 15-20% to exceed $430 million in 1991. Although an expansion of 15-20% is considered good, further growth will be impeded by the slowdown of drilling in the Gulf of Mexico. Total market growth should return to greater than 20% per year in 1992 and 1993. MWD technology is in the midst of a rapid adaptation phase, led by expansion of formation evaluation and other logs and by international expansion in long-reach directional and horizontal drilling. The formation evaluation-while- drilling market will have minimal impact on the size and growth of the wire line market. Customers will increasingly employ teams which include drilling and petrophysics personnel to make MWD purchase decisions. Integration of performance drilling systems including all bottom hole components will accelerate because of increases in automation and the need for cost reduction

  5. Measuring the optical properties of IceCube drill holes

    Directory of Open Access Journals (Sweden)

    Rongen Martin

    2016-01-01

    Full Text Available The IceCube Neutrino Observatory consists of 5160 digital optical modules (DOMs in a cubic kilometer of deep ice below the South Pole. The DOMs record the Cherenkov light from charged particles interacting in the ice. A good understanding of the optical properties of the ice is crucial to the quality of the event reconstruction. While the optical properties of the undisturbed ice are well understood, the properties of the refrozen drill holes still pose a challenge. A new data-acquisition and analysis approach using light originating from LEDs within one DOM detected by the photomultiplier of the same DOM will be described. This method allows us to explore the scattering length in the immediate vicinity of the considered DOMs.

  6. Low-impact sampling under an active solid low-level radioactive waste disposal unit using horizontal drilling technology

    International Nuclear Information System (INIS)

    Puglisi, C.V.; Vold, E.L.

    1995-01-01

    The purpose of this project was to determine the performance of the solid low-level radioactive waste (LLRW) disposal units located on a mesa top at TA-54, Area G, Los Alamos National Laboratory (LANL), Los Alamos, NM, and to provide in-situ (vadose zone) site characterization information to Area G's Performance Assessment. The vadose zone beneath an active disposal unit (DU 37), was accessed by utilizing low-impact, air-rotary horizontal drilling technology. Core samples were pulled, via wire-line core method, in 3 horizontal holes fanning out below DU 37 at approximately 5 foot intervals depending on recovery percentage. Samples were surveyed and prepared in-field following Environmental Restoration (ER) guidelines. Samples were transferred from the field to the CST-9 Radvan for initial radiological screening. Following screening, samples were delivered to CST-3 analytical lab for analyses including moisture content, 23 inorganics, 60 volatile organic compounds (VOC's), 68 semivolatile organic compounds (SVOC's), tritium, lead 210, radium 226 ampersand 228, cesium 137, isotopic plutonium, americium 241, strontium 90, isotopic uranium, and isotopic thorium. Other analyses included matric potential, alpha spectroscopy, gamma spectroscopy, and gross alpha/beta. The overall results of the analysis identified only tritium as having migrated from the DU. Am-241, Eu-152, and Pu-238 were possibly identified above background but the results are not definitive. Of all organics analysed for, only ethyl acetate was tentatively identified slightly above background. All inorganics were found to be well below regulatory limits. Based on the results of the above mentioned analyses, it was determined that Area G's disposal units are performing well and no significant liquid phase migration of contaminants has occurred

  7. Investigation on hole manufacture in 42CrMo4 steel using 3-flute carbide drills and 6-flute cermet reamers

    DEFF Research Database (Denmark)

    Müller, Pavel; De Chiffre, Leonardo

    2009-01-01

    An investigation on cutting forces and hole quality using carbide 3-flute self-centering drills and 6-flute cermet reamers was performed on 42CrMo4 alloy steel. Different depths of cuts were analyzed with respect to cutting thrust and cutting torque, hole diameter, form and surface integrity. Goo...

  8. Influence of Drilling Parameters on Torque during Drilling of GFRP Composites Using Response Surface Methodology

    Science.gov (United States)

    Mohan, N. S.; Kulkarni, S. M.

    2018-01-01

    Polymer based composites have marked their valuable presence in the area of aerospace, defense and automotive industry. Components made of composite, are assembled to main structure by fastener, which require accurate, precise high quality holes to be drilled. Drilling the hole in composite with accuracy require control over various processes parameters viz., speed, feed, drill bit size and thickens of specimen. TRIAC VMC machining center is used to drill the hole and to relate the cutting and machining parameters on the torque. MINITAB 14 software is used to analyze the collected data. As a function of cutting and specimen parameters this method could be useful for predicting torque parameters. The purpose of this work is to investigate the effect of drilling parameters to get low torque value. Results show that thickness of specimen and drill bit size are significant parameters influencing the torque and spindle speed and feed rate have least influence and overlaid plot indicates a feasible and low region of torque is observed for medium to large sized drill bits for the range of spindle speed selected. Response surface contour plots indicate the sensitivity of the drill size and specimen thickness to the torque.

  9. Optimum fluid design for drilling and cementing a well drilled with coil tubing technology

    Energy Technology Data Exchange (ETDEWEB)

    Swendsen, O.; Saasen, A.; Vassoy, B. [Statoil (Norway); Skogen, E.; Mackin, F.; Normann, S. H.

    1998-12-31

    The strategy, design and drilling fluid and cementing operations in the first two wells drilled with coil tubing technology in the Gullfaks field in the Tampen Spur Area of the Norwegian sector of the North Sea are discussed. The drilling fluid use was a solids-free potassium formate/polymer brine-based fluid with a density of 1,50-1.56 g/cc, with flow properties characterized by very low fluid loss due to high extensional viscosity, a low viscosity at all shear rates, and a low degree of shear-thinning. The low viscous drilling fluid is considered to have been the major contributing factor in achieving excellent hole cleaning, no differential sticking, successful setting of cement kick-off plugs, problem-free running of the liner, and excellent zonal isolation when cementing the liner. These experiences led the authors to conclude that it is possible to formulate a brine-based solids-free drilling fluid with low viscosity and fluid loss properties for most formation pressure regimes, and that such a drilling fluid is well suited to drilling highly deviated slim hole wells where hole cleaning and differential sticking present special challenges. 12 refs., 2 tabs., 3 figs.

  10. Preliminary report on the geology and geophysics of drill hole UE25a-1, Yucca Mountain, Nevada Test Site

    International Nuclear Information System (INIS)

    Spengler, R.W.; Muller, D.C.; Livermore, R.B.

    1979-01-01

    A subsurface geologic study in connection with the Nevada Nuclear Waste Storage Investigations has furnished detailed stratigraphic and structural information about tuffs underlying northeastern Yucca Mountain on the Nevada Test Site. Drill hole UE25a-1 penetrated thick sequences of nonwelded to densely welded ash-flow and bedded tuffs of Tertiary age. Stratigraphic units that were identified from the drill-hole data include the Tiva Canyon and Topopah Spring Members of the Paintbrush Tuff, tuffaceous beds of Calico Hills, and the Prow Pass and Bullfrog Members of the Crater Flat Tuff. Structural analysis of the core indicated densely welded zones to be highly fractured. Many fractures show near-vertical inclinations and are commonly coated with secondary silica, manganese and iron oxides, and calcite. Five falt zones were recognized, most of which occurred in the Topopah Spring Member. Shear fractures commonly show oblique-slip movement and some suggest a sizable component of lateral compression. Graphic logs are included that show the correlation of lithology, structural properties, and geophysical logs. Many rock units have characteristic log responses but highly fractured zones, occurring principally in the Tiva Canyon and Topopah Spring Members restricted log coverage to the lower half of the drill hole

  11. Stress analysis of thermal sprayed coatings using a semi-destructive hole-drilling strain gauge method

    International Nuclear Information System (INIS)

    Dolhof, V.; Musil, J.; Cepera, M.; Zeman, J.

    1995-01-01

    Residual stress is an important parameter in coating technology since it often relates to the maximum coating thickness which can be deposited without spallation, and this applies to coatings produced by different thermal spray and thin film technologies. Indeed, the mechanisms by which residual stress is built up or locked into a coating depends markedly on the deposition process and coating structure (growth structure, phase composition) in the same way too. Methods for determining residual stresses in materials include both destructive and non-destructive methods. This contribution describes semi-destructive hole-drilling strain gauge method modified for measurement of residual stresses in thermal sprayed coatings. This method of stress analysis was used for determination of stress levels in thermal sprayed WC-17% Co coatings onto 13% Cr steel substrates. Results show that deposition conditions and final coating structure influence directly the residual stress level in the coatings. It is proved that semi-destructive hole-tube drilling measurement is effective reproducible method of coating stress analysis and good solution for optimization of deposition process

  12. Design and Exploitation Problems of Drill String in Directional Drilling

    Directory of Open Access Journals (Sweden)

    Bednarz Stanislaw

    2004-09-01

    Full Text Available Drill string design for directional drilling requires accounting for a number of factors. First, types and expected values of loads should be determined. Then, elements of the drill string should be so selected as to enable realization of the plan at specified loads. Some of additional factors, e. g. purchase, exploitation cost, geological conditions in the bore-hole, washing of the bore-hole, stability, trajectory, rig parameters, accuracy of gauges, pumps parameters remain in conflict. Drill pipes are made of rolled pipes, upset and welded with tool joints to 9,5 m long; the shorter ones can be made of hot forged rods. Exploitation requirements, being a result of practical experience supported by theoretical and laboratory analyses should be a part of syllabuses of technical staff educational programs. Apart from designing the string, it is also vital to lower the risk of a drilling failure. The significance of these aspects seems to be unquestionable.

  13. Chemical analyses of potash-bearing horizons from 21 exploratory holes drilled at a tentative site for the Waste Isolation Pilot Plant, Eddy County, New Mexico

    International Nuclear Information System (INIS)

    Griswold, G.B.

    1977-09-01

    Sandia Laboratories drilled 21 potash drill holes over an 18,960-acre site in east-central Eddy County, New Mexico, to evaluate potash resources as part of their Waste Isolation Pilot Plant (WIPP) project. This report furnishes assay information on samples obtained from the drilling program

  14. Estimation grade of uranium from drill hole gamma logs

    International Nuclear Information System (INIS)

    Juliao, B.

    1986-01-01

    Radiometric grade of uranium deposits can be determined from drill hole gamma logs. The calculation of uranium oxide content can be obtained with good precision when the uranium ore is in radioactive equilibrium, containing only a small amount of thorium and no interference of potassium. This is the case of uranium ore from the Lagoa Real Uranium Province presented in this paper. The radioactive disequilibrium study in this province were made working over nine hundred samples analised with this special purpose in the CDTN-NUCLEBRAS laboratories. The data obtained indicated that the uranium in the ore is in perfect equilibrium with their daughter gamma emitters. Futhermore, the amount of Th and K is of no significance, so that the gamma counting represents exactly the uranium content of the ore. (author) [pt

  15. Drilling the leading edge of the mantle wedge and the underlying metamorphic sole of the Samail Ophiolite: Hole BT1B, Oman Drilling Project

    Science.gov (United States)

    Morishita, T.; Kelemen, P. B.; Coggon, J. A.; Harris, M.; Matter, J. M.; Michibayashi, K.; Takazawa, E.; Teagle, D. A. H.

    2017-12-01

    Hole BT1B (23°21.861' N, 58°10.957' E) was drilled by the Oman Drilling Project (OmDP) on the north side of Wadi Mansah in the Samail ophiolite, Oman. OmDP is an international collaboration supported by the International Continental Scientific Drilling Program, Deep Carbon Observatory, NSF, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, with in-kind support in Oman from the Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University, and the German University of Technology. Hole BT1B was cored from 6 to 23 March 2017, to a depth of 300.05 m. The outer surfaces of the cores were imaged and described onsite before being curated, boxed and shipped to the IODP drill ship Chikyu. Hole BT1B sampled carbonated peridotite (listvenite), 2 carbonate-veined serpentinite bands at 80-100 and 180-185 m depth, a few cm of ultracataclasite and 70 cm of fault gouge at 197 m depth, followed by 103 m metamorphic sole. Onboard Chikyu, BT1B underwent X-ray computed tomography (CT) and multi-sensor logging, imaging and spectroscopy, macroscopic and thin section observations, physical properties measurements, and XRF, XRD and ICP-MS analyses. 1st authors of abstracts reporting initial results are Beinlich (matrix characteristics), de Obeso (modeling mass transfer), Godard (XRF and ICP-MS whole rock data), Greenberger (infrared spectroscopy), Johnson (XRF core scanner), Kelemen (overall petrology), Manning (veins), and Michibayashi (X-ray CT). Listvenite is composed of carbonate + quartz + Fe-oxyhydroxides, + minor relict spinel ± chromian mica (fuchsite). The mineralogy suggests formation at < 150°C. The bulk rock density is similar to that of gabbro but the P-wave velocity is generally higher. Rock textures suggest viscous deformation, while additional brittle deformation is recorded by older veins and younger breccias and faults. The metamorphic sole consists of fine-grained to microcrystalline

  16. Drilling and blasting parameters in sublevel caving in Sheregesh mine

    Science.gov (United States)

    Eremenko, AA; Filippov, VN; Konurin, AI; Khmelinin, AP; Baryshnikov, DV; Khristolyubov, EA

    2018-03-01

    The factors that influence geomechanical state of rock mass in Sheregesh Mine are determined. The authors discuss a variant of geotechnology with fan drilling. The drill-hole patterns and drilling-and-blasting parameters are presented. The revealed causes of low-quality fragmentation of rocks include the presence of closed and open fractures at different distances from drill-hole mouths, both in case of rings and fans, as well as the blocking of drill-holes with rocks.

  17. 30 CFR 57.7055 - Intersecting holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Intersecting holes. 57.7055 Section 57.7055... Jet Piercing Drilling-Surface and Underground § 57.7055 Intersecting holes. Holes shall not be drilled where there is a danger of intersecting a misfired hole or a hole containing explosives, blasting agents...

  18. 30 CFR 56.7055 - Intersecting holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Intersecting holes. 56.7055 Section 56.7055... Piercing Drilling § 56.7055 Intersecting holes. Holes shall not be drilled where there is a danger of intersecting a misfired hole or a hole containing explosives blasting agents, or detonators. [56 FR 46508, Sept...

  19. Well drilling by rotary percussive drill above ground

    International Nuclear Information System (INIS)

    Sabatier, G.

    1987-01-01

    Originally, the Well Drilling Section of Cogema used only the diamond core drilling technique. The appearance of independent rotation for compressed air rock drills has led to the use and to the development of this drilling system, as a drill core is not indispensable, when the material of the search is radioactive. During the last few years, hydraulic drills have replaced the compressed air drills and have resulted in a very marked improvement: - of the penetration rates; - of the depth achieved. The Well Drilling Section of Cogema has to drill about 400 km per year with rock drills above ground and holds also the record for depth achieved with this technique, i.e. 400 m in granite. In France, the costs of these types of drilling are for the same depth of the order of one-quarter of the core drilling and half of the drilling with a down-the-hole drill. Cogema has greatly developed the types of well logging which now permits the extension of this type of drilling to the search for other materials than uranium [fr

  20. Drillings at Kivetty in Konginkangas

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-05-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Kivetty, Konginkangas the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1019 m) and 4 about 500 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 65 shotholes were drilled for VSP-, tubewave and seismic measurements

  1. Drillings at Syyry in Sievi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-10-01

    According to Government's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Syyry, Sievi the investigation program was started in spring 1988. During years 1988-1989 a deep borehole (1022 m) and 4 about 500-700 m deep additional boreholes were core drilled in the area. The structure of the holes makes it possible to carry out many investigations in the holes. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisson's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. 35 vertical holes were core drilled down to the depth of 10-20 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition about 85 shotholes were drilled for VSP-, tubewave and seismic measurements

  2. Hole history, rotary hole DC-3

    International Nuclear Information System (INIS)

    1977-10-01

    Purpose of hole DC-3 was to drill into the Umtanum basalt flow using both conventional rotary and core drilling methods. The borehole is to be utilized for geophysical logging, future hydrological testing, and the future installation of a borehole laboratory for long-term pressure, seismic, and moisture migration or accumulation recording in the Umtanum basalt flow in support of the Basalt Waste Isolation Program. Hole DC-3 is located east of the 200 West barricaded area on the Hanford reservation

  3. Heterogeneous Shallow-Shelf Carbonate Buildups in the Paradox Basin, Utah and Colorado: Targets for Increased Oil Production and Reserves Using Horizontal Drilling Techniques

    Energy Technology Data Exchange (ETDEWEB)

    Wray, Laura L.; Eby, David E.; Chidsey, Jr., Thomas C.

    2002-07-24

    This report covers research activities for the second half of the second project year (October 6, 2001, through April 5, 2002). This work includes description and analysis of cores, correlation of geophysical well logs, reservoir mapping, petrographic description of thin sections, cross plotting of permeability and porosity data, and development of horizontal drilling strategies for the Little Ute and Sleeping Ute fields in Montezuma County, Colorado. Geological characterization on a local scale focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible compartmentalization, within these fields. This study utilizes representative core, geophysical logs, and thin sections to characterize and grade each field's potential for drilling horizontal laterals from existing development wells.

  4. Interpretation of hole-to-surface resistivity measurements at Yucca Mountain, Nevada Test Site

    International Nuclear Information System (INIS)

    Daniels, J.J.; Scott, J.H.

    1981-01-01

    Hole-to-surface resistivity measurements at Yucca Mountain indicate the presence of many near-surface geologic inhomogeneities, with no definite indication of deep structural features. A resistive anomaly near drill hole UE25a-6 is interpreted as a thin, vertical, resistive body that nearly intersects the surface, and may be caused by a silicified, or calcified, fracture zone. A resistive anomaly near hole UE25a-7 is probably caused by a near surface, horizontal, lens-shaped body that may represent a devitrified zone in the Tiva Canyon Member. Many conductive anomalies were detected to the southwest of hole UE25a-4. However, these anomalies are interpreted to be caused by variations in the thickness of the surface alluvium

  5. Toward a better understanding of glass gravity-feed micro-hole drilling with electrochemical discharges

    International Nuclear Information System (INIS)

    Jalali, M; Maillard, P; Wüthrich, R

    2009-01-01

    Spark-assisted chemical engraving (SACE) is a flexible, simple and inexpensive method for machining electrically non-conductive materials. SACE is particularly interesting because of the high drilling speed that can be achieved compared to other micromachining technologies. In this paper, the issue of drilling speed decreasing from 100 µm s −1 to 10 µm s −1 for micro-hole depths more than 200–300 µm is analyzed. To understand better the material removal mechanism, with the target to eliminate this limit, a model for the material removal mechanism as a hybrid mechanism combining local heating and chemical etching is presented and compared with experimental data. The comparison between the model and experiment allowed the estimation of the machining temperature to be around 600 °C

  6. Basaltic litho-stratigraphy of Ocean Drilling Program Hole 504B

    International Nuclear Information System (INIS)

    Harvey, P.K.; Lovell, M.A.

    1989-01-01

    Hole 504B is located in 5.9 Ma old crust to the south of the Costa Rica Rift. It has been drilled and cored successively on three occasions to a total depth of 1562.1 m below the sea floor and penetrates both basaltic pillows and dykes. Appraisal of the drilled section is difficult because of the low proportion of recovered material (average 20%). In September 1986 a suite of downhole nuclear logs were run. Part of this sequence, the interval 4200-4600 m below sea level, which covers the pillow-dyke transition zone, has been used in this study. The log derived geochemical estimates may be explained in terms of the basaltic mineralogy with the superimposed effects of alteration. Poor correlation between laboratory-measured and log-derived geochemical estimates are due to this alteration, problems of sampling and the absence of a boron sleeve when the tools were run. Alteration and sampling account for the much greater observed variations in the log data and the bias in SiO 2 and CaO abundances. Statistical analysis allows the logs to be presented in the form of a ''geochemical stratigraphy'' which correlates well with the known sequence within the interval studied. (author)

  7. Log response of ultrasonic imaging and its significance for deep mineral prospecting of scientific drilling borehole-2 in Nanling district, China

    International Nuclear Information System (INIS)

    Xiao, Kun; Zou, Changchun; Xiang, Biao; Yue, Xuyuan; Zhou, Xinpeng; Li, Jianguo; Zhao, Bin

    2014-01-01

    The hole NLSD-2, one of the deepest scientific drilling projects in the metallic ore districts of China, is the second scientific drilling deep hole in the Nanling district. Its ultimate depth is 2012.12 m. This hole was created through the implementation of continuous coring, and the measuring of a variety of geophysical well logging methods was performed over the course of the drilling process. This paper analyzes the characteristic responses of the fracture and fractured zone by ultrasonic imaging log data, and characterizes various rules of fracture parameters which change according to drilling depth. It then discusses the denotative meaning of the log results of polymetallic mineralization layers. The formation fractures develop most readily in a depth of 100∼200 m, 600∼850 m and 1450∼1550 m of the hole NLSD-2, and high angle fractures develop most prominently. The strike direction of the fractures is mainly NW-SE, reflecting the orientation of maximum horizontal principal stress. For the polymetallic mineralization layer that occurred in the fractured zone, the characteristic response of ultrasonic imaging log is a wide dark zone, and the characteristic responses of conventional logs displayed high polarizability, high density, high acoustic velocity and low resistivity. All the main polymetallic mineralization layers are developed in fractures or fractured zones, and the fractures and fractured zones can be identified by an ultrasonic imaging log, thus the log results indirectly indicate the occurrence of polymetallic mineralization layers. Additionally, the relationship between the dip direction of fractures and the well deviation provides guidance for straightening of the drilling hole. (paper)

  8. CASING DRILLING TECHNOLOGY

    Directory of Open Access Journals (Sweden)

    Nediljka Gaurina-Međimurec

    2005-12-01

    Full Text Available Casing drilling is an alternative option to conventional drilling and uses standard oilfield casing instead of drillstring. This technology is one of the greatest developments in drilling operations. Casing drilling involves drilling and casing a well simultaneously. In casing driling process, downhole tools can be retrieved, through the casing on wire-line, meaning tool recovery or replacement of tools can take minutes versus hours under conventional methods. This process employs wireline-retrievable tools and a drill-lock assembly, permitting bit and BHA changes, coring, electrical logging and even directional or horizontal drilling. Once the casing point is reached, the casing is cemented in place without tripping pipe.

  9. Selective fracturing completion in horizontal open hole provides a new horizon in the Chicontepec Basin

    Energy Technology Data Exchange (ETDEWEB)

    Terrazas, Martin; Huidobro, Efrain [Petroleos Mexicanos (PEMEX), Mexico, DF (Mexico); Bernechea, Jose Maria; Kalinin, Daniel [Schlumberger Servicos de Petroleo Ltda., Rio de Janeiro, RJ (Brazil)

    2008-07-01

    Over the past few years, production has declined in Mexico's main producing field (Cantarell). Because of this decline and increasing oil prices, the operating company has sought to increase oil production from other fields, such as the Chicontepec field, which is located in Veracruz. It is 3,815 k m2 in area and has over 139 billion b bl of original oil in place, from which an estimated 12 billion b bl are recoverable with existing technology. Chicontepec is not naturally as prolific as Cantarell, which forces the operating company and service companies to find new and more creative solutions to unlock the economic potential of this low-permeability basin. Over the past two years, the operating company and the service companies have collaborated to find unconventional solutions to maximize hydrocarbon recovery in Chicontepec. Most recently, the operating company started drilling a multilateral well with two horizontal lateral sections to boost production. After disappointing initial oil rates from the naturally completed open hole section in the first arm, engineers were called upon to design a novel completion and fracturing program that would facilitate multiple propped hydraulic fractures to effectively stimulate the well. Two arms of the multilateral well were stimulated and auspicious results were obtained. Our simulations indicate that commingled production from multiple efficient treatments is the key to unlock Chicontepec potential and change project economics. (author)

  10. Archaeological studies at Drill Hole U20az Pahute Mesa, Nye county, Nevada. [Contains bibliography

    Energy Technology Data Exchange (ETDEWEB)

    Simmons, A.H.; Hemphill, M.L.; Henton, G.H.; Lockett, C.L.; Nials, F.L.; Pippin, L.C.; Walsh, L.

    1991-07-01

    During the summer of 1987, the Quaternary Sciences Center (formerly Social Science Center) of the Desert Research Institute (DRI), University of Nevada System, conducted data recovery investigations at five archaeological sites located near Drill Hole U20az on the Nevada Test Site in southern Nevada. These sites were among 12 recorded earlier during an archaeological survey of the drill hole conducted as part of the environmental compliance activities of the Department of Energy (DOE). The five sites discussed in this report were considered eligible for the National Register of Historic Places and were in danger of being adversely impacted by construction activities or by effects of the proposed underground nuclear test. Avoidance of these sites was not a feasible alternative; thus DRI undertook a data recovery program to mitigate expected adverse impacts. DRI's research plan included controlled surface collections and excavation of the five sites in question, and had the concurrence of the Nevada Division of Historic Preservation and Archaeology and the Advisory Council of Historic Preservation. Of the five sites investigated, the largest and most complex, 26Ny5207, consists of at least three discrete artifact concentrations. Sites 26Ny5211 and 26Ny5215, both yielded considerable assemblages. Site 26Ny5206 is very small and probably is linked to 26Ny5207. Site 26Ny5205 contained a limited artifact assemblage. All of the sites were open-air occurrences, and, with one exception contained no or limited subsurface cultural deposits. Only two radiocarbon dates were obtained, both from 26Ny5207 and both relatively recent. While the investigations reported in the volume mitigate most of the adverse impacts from DOE activities at Drill Hole U20az, significant archaeological sites may still exist in the general vicinity. Should the DOE conduct further activities in the region, additional cultural resource investigations may be required. 132 refs., 71 figs., 44 tabs.

  11. Measurement of the magnetic field inside the holes of a drilled bulk high-Tc superconductor

    Science.gov (United States)

    Lousberg, Gregory P.; Fagnard, Jean-François; Noudem, Jacques G.; Ausloos, Marcel; Vanderheyden, Benoit; Vanderbemden, Philippe

    2009-04-01

    We use macroscopic holes drilled in a bulk YBCO superconductor to probe its magnetic properties in the volume of the sample. The sample is subjected to an AC magnetic flux with a density ranging from 30 to 130 mT and the flux in the superconductor is probed by miniature coils inserted in the holes. In a given hole, three different penetration regimes can be observed: (i) the shielded regime, where no magnetic flux threads the hole; (ii) the gradual penetration regime, where the waveform of the magnetic field has a clipped sine shape whose fundamental component scales with the applied field; and (iii) the flux concentration regime, where the waveform of the magnetic field is nearly a sine wave, with an amplitude exceeding that of the applied field by up to a factor of two. The distribution of the penetration regimes in the holes is compared with that of the magnetic flux density at the top and bottom surfaces of the sample, and is interpreted with the help of optical polarized light micrographs of these surfaces. We show that the measurement of the magnetic field inside the holes can be used as a local characterization of the bulk magnetic properties of the sample.

  12. Drillings at Veitsivaara in Hyrynsalmi

    International Nuclear Information System (INIS)

    Hinkkanen, H.; Oehberg, A.

    1990-04-01

    According to Governmen's decision in principle Teollisuuden Voima Oy is obliged to make bedrock investigations for the final disposal of the spent fuel produced by its power plant in Olkiluoto. Areas in Kuhmo, Hyrynsalmi, Sievi, Konginkangas and Olkiluoto were selected for the preliminary site investigations to be carried out during years 1987-1992. In Veitsivaara, Hyrynsalmi the investigation program was started in April 1987. During years 1987-1988 a deep borehole (1002 m) and 4 and 500 m deep additional boreholes were core drilled in the area. Various parameters were measured from the flushing water during the drilling. Corelogging included collecting detailed data of fractures and determining the weathering degree and petrographical properties. Rock mechanical properties, uniaxial compressive strength, Young's modulus and Poisso's ratio were measured from core samples. The flushing water needed in the drillings was pumped from 100 m deep borehole wells drilled with down-the-hole method in the vicinity of the borehole. The water was labeled with 2 tracers before use. About 75 m deep hole was percussion drilled near the borehole KR1. The spreading of the flushing water in the upper part of bedrock and the quality off the ground of the groundwater were studied by taking watersamples from the hole. 30 vertical holes were core drilled down to the depth of 10 m in bedrock with a light drilling unit. Drilling was carried out in order to determine the thickness of the overburden, to investigate the geophysical anomaly sources and to support geological mapping in areas covered with overburden. Groundwater hydraulics is one of the main subjects during the preliminary site investigation phase. For that reason 7 multilevel piezometers were installed on the site to monitore hydraulic head in 3 levels in the uppermost part of bedrock. The work consisted of borehole drillings to the depth of 100 m, geophysical borehole loggings and installation of piezometers. In addition

  13. Drilling azimuth gamma embedded design

    Directory of Open Access Journals (Sweden)

    Zhou Yi Ren

    2016-01-01

    Full Text Available Embedded drilling azimuth gamma design, the use of radioactive measuring principle embedded gamma measurement while drilling a short section analysis. Monte Carlo method, in response to the density of horizontal well logging numerical simulation of 16 orientation, the orientation of horizontal well analysed, calliper, bed boundary location, space, different formation density, formation thickness, and other factors inclined strata dip the impact by simulating 137Cs sources under different formation conditions of the gamma distribution, to determine the orientation of drilling density tool can detect window size and space, draw depth of the logging methods. The data 360° azimuth imaging, image processing method to obtain graph, display density of the formation, dip and strata thickness and other parameters, the logging methods obtain real-time geo-steering. To establish a theoretical basis for the orientation density logging while drilling method implementation and application of numerical simulation in-depth study of the MWD azimuth and density log response factors of horizontal wells.

  14. Effect of diameter of the drill hole on torque of screw insertion and pushout strength for headless tapered compression screws in simulated fractures of the lateral condyle of the equine third metacarpal bone.

    Science.gov (United States)

    Carpenter, Ryan S; Galuppo, Larry D; Stover, Susan M

    2006-05-01

    To compare variables for screw insertion, pushout strength, and failure modes for a headless tapered compression screw inserted in standard and oversize holes in a simulated lateral condylar fracture model. 6 pairs of third metacarpal bones from horse cadavers. Simulated lateral condylar fractures were created, reduced, and stabilized with a headless tapered compression screw by use of a standard or oversize hole. Torque, work, and time for drilling, tapping, and screw insertion were measured during site preparation and screw implantation. Axial load and displacement were measured during screw pushout. Effects of drill hole size on variables for screw insertion and screw pushout were assessed by use of Wilcoxon tests. Drill time was 59% greater for oversize holes than for standard holes. Variables for tapping (mean maximum torque, total work, positive work, and time) were 42%, 70%, 73%, and 58% less, respectively, for oversize holes, compared with standard holes. Variables for screw pushout testing (mean yield load, failure load, failure displacement, and failure energy) were 40%, 40%, 47%, and 71% less, respectively, for oversize holes, compared with standard holes. Screws could not be completely inserted in 1 standard and 2 oversize holes. Enlarging the diameter of the drill hole facilitated tapping but decreased overall holding strength of screws. Therefore, holes with a standard diameter are recommended for implantation of variable pitch screws whenever possible. During implantation, care should be taken to ensure that screw threads follow tapped bone threads.

  15. Horizontal well impact on heavy oil supply

    International Nuclear Information System (INIS)

    Bowers, B.; Bielecki, J.; Hu, J.; Wall, B.; Drummond, K.

    1993-01-01

    Horizontal wells can take advantage of gravity drainage mechanisms, which can be important in conventional heavy oil and bitumen recovery. Horizontal drilling will impact on the development of established conventional heavy oil pools by infill drilling and application of enhanced recovery techniques. There will also be an impact on the development of extensions to established and newly discovered heavy oil pools, as well as a major impact on development of bitumen resources. To assess the impact of horizontal drilling on heavy oil supply, high-impact and low-impact scenarios were evaluated under specified oil-price assumptions for four heavy oil areas in Saskatchewan and Alberta. Horizontal well potential for infill drilling, waterflood projects, and thermal projects was assessed and estimates were made of such developments as reserves additions and heavy oil development wells under the two scenarios. In the low case, projected supply of conventional heavy oil and bitumen stabilizes at a level in the 90,000-94,000 m 3 /d after 1994. In the high case, overall supply continuously grows from 80,000 m 3 /d in 1992 to 140,000 m 3 /d in 2002. Through application of horizontal drilling, reserves additions in western Canada could be improved by ca 100 million m 3 by 2002. 14 figs., 6 tabs

  16. Radon/radium detection increases uranium drilling effectiveness

    International Nuclear Information System (INIS)

    Morse, R.H.; Cook, L.M.

    1979-01-01

    The use of portable radon detectors has become routine in reconnaissance uranium surveys where water and sediment samples are analyzed in field labs for radon and radium, and in detailed work where drill hole locations are pinpointed by field determinations of radon in soil gas from shallow holes. During the drilling program itself, however, very few operators are taking advantage of radon and radium analyses to decide whether a barren drill hole was a near miss or whether the immediate area can be written off. The technique, which is outlined here, is effective both above and below the water table

  17. 30 CFR 77.1010 - Collaring holes.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Collaring holes. 77.1010 Section 77.1010... Control § 77.1010 Collaring holes. (a) Starter steels shall be used when collaring holes with hand-held drills. (b) Men shall not hold the drill steel while collaring holes, or rest their hands on the chuck or...

  18. Heterogeneous Shallow-Shelf Carbonate Buildups in the Paradox Basin, Utah and Colorado: Targets for Increased Oil Production and Reserves Using Horizontal Drilling Techniques; SEMIANNUAL

    International Nuclear Information System (INIS)

    Chidsey, Thomas C. Jr.; Eby, David E.; Wray, Laural L.

    2001-01-01

    The project's primary objective was to enhance domestic petroleum production by demonstration and transfer of horizontal drilling technology in the Paradox Basin, Utah, Colorado, Arizona, and New Mexico. If this project can demonstrate technical and economic feasibility, then the technique can be applied to approximately 100 additional small fields in the Paradox Basin alone, and result in increased recovery of 25 to 50 million barrels (4-8 million m3) of oil. This project was designed to characterize several shallow-shelf carbonate reservoirs in the Pennsylvanian (Desmoinesian) Paradox Formation, choose the best candidate(s) for a pilot demonstration project to drill horizontally from existing vertical wells, monitor well performance(s), and report associated validation activities

  19. Heterogeneous Shallow-Shelf Carbonate Buildups in the Paradox Basin, Utah and Colorado: Targets for Increased Oil Production and Reserves Using Horizontal Drilling Techniques; SEMIANNUAL

    International Nuclear Information System (INIS)

    Wray, Laura L.; Eby, David E.; Chidsey, Jr. Thomas C.

    2002-01-01

    This report covers research activities for the second half of the second project year (October 6, 2001, through April 5, 2002). This work includes description and analysis of cores, correlation of geophysical well logs, reservoir mapping, petrographic description of thin sections, cross plotting of permeability and porosity data, and development of horizontal drilling strategies for the Little Ute and Sleeping Ute fields in Montezuma County, Colorado. Geological characterization on a local scale focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible compartmentalization, within these fields. This study utilizes representative core, geophysical logs, and thin sections to characterize and grade each field's potential for drilling horizontal laterals from existing development wells

  20. Electric motor for laser-mechanical drilling

    Science.gov (United States)

    Grubb, Daryl L.; Faircloth, Brian O.; Zediker, Mark S.

    2015-07-07

    A high power laser drilling system utilizing an electric motor laser bottom hole assembly. A high power laser beam travels within the electric motor for advancing a borehole. High power laser drilling system includes a down hole electrical motor having a hollow rotor for conveying a high power laser beam through the electrical motor.

  1. Drill-string design for directional wells

    Energy Technology Data Exchange (ETDEWEB)

    Dawson, R; Corbett, K T [Exxon Production Research Co., Houston, TX (USA)

    1983-01-01

    This paper is concerned with predicting the tension and torsion loads on drill strings in directional wells and with adjusting the string design or well plan to provide adequate strength. Drill-string drag is the incremental force that is required to move the pipe up or down in the hole; torque is the moment required to rotate the pipe. Drag forces are usually given relative to the string weight measured with the string roating but not reciprocating. Measured from the roating string weight, the pick-up drag is usually slightly greater than the slack-off drag. The magnitudes of torque and drag are related in any particular well; high drag forced and exessive torque loads normally occur together. There are a number of phenomena wich contribute to torque and drag. Included are tight hole conditions, sloughing hole, keyseats, differential sticking, cuttings build up due to poor hole cleaning and sliding wellbore friction. With the exception of sliding friction, these causes are associated with problem conditions in the wellbore. Conversely, in wells with good hole conditions, the primary source of torque and drag is sliding friction. This paper is only concerned with the torque and drag caused by sliding friction. The cabability to predict frictional loads on drill pipe has two main benefits. First, more complete knowledge of drill-string loading allows use of improved drill-string design techniques. Drill-string components can be chosen using a systematic approach considering the force involved. Second, deep, highly-deviated wells can be planned to minimize torque and drag. Use of torque and drag as a criteria to select the most appropriate well path will help ensure successful drilling operations to total depth. 1 fig., 2 tabs. (Author).

  2. Minimization of the hole overcut and cylindricity errors during rotary ultrasonic drilling of Ti-6Al-4V

    Science.gov (United States)

    Nasr, M.; Anwar, S.; El-Tamimi, A.; Pervaiz, S.

    2018-04-01

    Titanium and its alloys e.g. Ti6Al4V have widespread applications in aerospace, automotive and medical industry. At the same time titanium and its alloys are regarded as difficult to machine materials due to their high strength and low thermal conductivity. Significant efforts have been dispensed to improve the accuracy of the machining processes for Ti6Al4V. The current study present the use of the rotary ultrasonic drilling (RUD) process for machining high quality holes in Ti6Al4V. The study takes into account the effects of the main RUD input parameters including spindle speed, ultrasonic power, feed rate and tool diameter on the key output responses related to the accuracy of the drilled holes including cylindricity and overcut errors. Analysis of variance (ANOVA) was employed to study the influence of the input parameters on cylindricity and overcut error. Later, regression models were developed to find the optimal set of input parameters to minimize the cylindricity and overcut errors.

  3. Literature review of the benefits and obstacle of horizontal directional drilling

    Science.gov (United States)

    Norizam, M. S. Mohd; Nuzul Azam, H.; Helmi Zulhaidi, S.; Aziz, A. Abdul; Nadzrol Fadzilah, A.

    2017-11-01

    In this new era the construction industry not only need to be completed within budget, timely, at acceptable quality and safety but the stakeholders especially the local authorities and the public realises for the important need of sustainable construction method to be used for our younger generation to heritage if not better a safer world for them to live and raise up their children’s. Horizontal Directional Drilling method is the most commonly recognised trenchless utilities method as a preferred construction method in this age. Among the reasons HDD method offers less disturbance on traffic, the public, business activities and neighbourhood, lower restoration cost, less noise, dust and minimum import/export of the construction materials. In addition HDD method can drill through congested utilities areas with minimum cutting and shorter time. This paper aims to appraise the benefits and obstacle of HDD method in construction industry. It is an endeavour to fulfil the local authorities cry for alternative method that less damages to the roads, road furniture’s and public complaints compared to the conventional open cut method. In addition HDD method is seem to be in line with sustainable development requirements e.g. reduce, reuse, recycle and etc. Hence, it is important to determine the benefits and obstacle factors of HDD implementation. The factors are based on the literature review conducted by the author on the subject matters gathered from previous studies, journals, text books, guidelines, magazine articles, newspaper cutting and etc.

  4. 30 CFR 33.34 - Drilling test.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Drilling test. 33.34 Section 33.34 Mineral... MINING PRODUCTS DUST COLLECTORS FOR USE IN CONNECTION WITH ROCK DRILLING IN COAL MINES Test Requirements § 33.34 Drilling test. (a) A drilling test shall consist of drilling a set of 10 test holes, without...

  5. Results of exploratory drill hole UE7nS East-Central Yucca Flat, Nevada Test Site

    International Nuclear Information System (INIS)

    Wagoner, J.L.; Ramspott, L.D.

    1981-01-01

    Exploratory hole UE7nS was drilled to a depth of 672.1 m in East-Central Yucca Flat, Nevada Test Site, as part of a program sponsored by the Nuclear Monitoring Office (NMO) of the Advanced Research Projects Agency (ARPA). The purpose of the program is to determine the geologic and geophysical characteristics of selected locations that have demonstrated anomalous seismic signals. The purpose for drilling UE7nS was to provide the aforementioned data for emplacement site U7n. This report presents lithologic and stratigraphic descriptions, geophysical logs, physical properties, and water table measurements. An analysis of these data has been made and a set of recommended values is presented

  6. Results of exploratory drill hole UE7nS East-Central Yucca Flat, Nevada Test Site

    Energy Technology Data Exchange (ETDEWEB)

    Wagoner, J.L.; Ramspott, L.D.

    1981-03-02

    Exploratory hole UE7nS was drilled to a depth of 672.1 m in East-Central Yucca Flat, Nevada Test Site, as part of a program sponsored by the Nuclear Monitoring Office (NMO) of the Advanced Research Projects Agency (ARPA). The purpose of the program is to determine the geologic and geophysical characteristics of selected locations that have demonstrated anomalous seismic signals. The purpose for drilling UE7nS was to provide the aforementioned data for emplacement site U7n. This report presents lithologic and stratigraphic descriptions, geophysical logs, physical properties, and water table measurements. An analysis of these data has been made and a set of recommended values is presented.

  7. Effect of Osteonecrosis Intervention Rod Versus Core Decompression Using Multiple Small Drill Holes on Early Stages of Necrosis of the Femoral Head: A Prospective Study on a Series of 60 Patients with a Minimum 1-Year-Follow-Up.

    Science.gov (United States)

    Miao, Haixiong; Ye, Dongping; Liang, Weiguo; Yao, Yicun

    2015-01-01

    The conventional CD used 10 mm drill holes associated with a lack of structural support. Thus, alternative methods such as a tantalum implant, small drill holes, and biological treatment were developed to prevent deterioration of the joint. The treatment of CD by multiple 3.2 mm drill holes could reduce the femoral neck fracture and partial weight bearing was allowed. This study was aimed to evaluate the effect of osteonecrosis intervention rod versus core decompression using multiple small drill holes on early stages of necrosis of the femoral head. From January 2011 to January 2012, 60 patients undergoing surgery for osteonecrosis with core decompression were randomly assigned into 2 groups based on the type of core decompression used: (1) a total of 30 osteonecrosis patients (with 16 hips on Steinburg stageⅠ,20 hips on Steinburg stageⅡ) were treated with a porous tantalum rod insertion. The diameter of the drill hole for the intervention rod was 10mm.(2) a total of 30 osteonecrosis patients (with 14 hips on Steinburg stageⅠ,20 hips on Steinburg stageⅡ) were treated with core decompression using five drill holes on the lateral femur, the diameter of the hole was 3.2 mm. The average age of the patient was 32.6 years (20-45 years) and the average time of follow-up was 25.6 months (12- 28 months) in the rod implanted group. The average age of the patient was 35.2 years (22- 43 years) and the average time of follow-up was 26.3 months (12-28 months) in the small drill holes group. The average of surgical time was 40 min, and the mean volume of blood loss was 30 ml in both surgical groups. The average of Harris score was improved from 56.2 ± 7.1 preoperative to 80.2 ± 11.4 at the last follow-up in the rod implanted group (p holes group (pholes group. No significant difference was observed in radiographic stage between the two groups. There was no favourable result on the outcome of a tantalum intervention implant compared to multiple small drill holes. CD via

  8. Oceanic crustal velocities from laboratory and logging measurements of Integrated Ocean Drilling Program Hole 1256D

    Science.gov (United States)

    Gilbert, Lisa A.; Salisbury, Matthew H.

    2011-09-01

    Drilling and logging of Integrated Ocean Drilling Program (IODP) Hole 1256D have provided a unique opportunity for systematically studying a fundamental problem in marine geophysics: What influences the seismic structure of oceanic crust, porosity or composition? Compressional wave velocities (Vp) logged in open hole or from regional refraction measurements integrate both the host rock and cracks in the crust. To determine the influence of cracks on Vp at several scales, we first need an accurate ground truth in the form of laboratory Vp on crack-free, or nearly crack-free samples. We measured Vp on 46 water-saturated samples at in situ pressures to determine the baseline velocities of the host rock. These new results match or exceed Vp logs throughout most of the hole, especially in the lower dikes and gabbros, where porosities are low. In contrast, samples measured at sea under ambient laboratory conditions, had consistently lower Vp than the Vp logs, even after correction to in situ pressures. Crack-free Vp calculated from simple models of logging and laboratory porosity data for different lithologies and facies suggest that crustal velocities in the lavas and upper dikes are controlled by porosity. In particular, the models demonstrate significant large-scale porosity in the lavas, especially in the sections identified as fractured flows and breccias. However, crustal velocities in the lower dikes and gabbros are increasingly controlled by petrology as the layer 2-3 boundary is approached.

  9. A comparison of residual stresses in built-up steel beams using hole-drilling method

    International Nuclear Information System (INIS)

    Nawafleh, M. A.; Hunaiti, Y. M.; Younes, R. M.

    2009-01-01

    Residual stresses have a significant effect on the stability resistance of metal building systems. An experimental program was conducted to measure these stresses in built-up steel beams using incremental hole-drilling method. The experimental results reveal that the predicted residual stress type of pattern for built-up I-sections with fillet welds on one side of the web is not the same as the pattern of residual stresses in built-up I-sections with fillet welds on both sides of the web

  10. Controlled drilling technology for HLW management. Directional drilling and mechanics/stress measurements in the borehole

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Shin, Koichi; Okada, Tetsuji; Obuchi, Yasuyoshi; Sunaga, Takayuki; Hase, Kazunori

    2013-01-01

    Since 2000, Central Research Institute of Electric Power Industry (CRIEPI) has been conducting the project on controlled drilling and the logging/measurement technologies in its boreholes. Especially borehole pressure meter and bore hole stress measurement apparatus which can apply to the controlled drilling system was developed. The bore hole was drilled to the 1000 m long in order to intersect the Omagari fault located at Horonobe town in Hokkaido and its core recovery was 99.8% as of FY. 2011. Using borehole logging/measurement/survey, the geological, hydrological, geo-mechanical, geophysical and geochemical data were collected and the Omagari fault was characterized. (author)

  11. The use of horizontal wells for subsurface soil and aquifer remediation

    International Nuclear Information System (INIS)

    May, D.W.

    1994-01-01

    The use of directionally controlled horizontal drilling for environmental restoration had its genesis in 1988 when two horizontal remediation wells were drilled at the Savannah River Nuclear Facility near Aiken, South Carolina. Since that time, horizontal remediation wells have been drilled at several Department of Energy and Department of Defense sites as well as on several commercial sites across the country. Directional drilling technology applied to ''Near Surface Horizontal Environmental Drilling'' comes from the oil and gas industry, the utility/pipeline river crossing industry and to a lesser extent the mining industry. Rig designs vary from very small track or wheel mounted rigs using 10 feet (3 meters) drill pipe and having less than 2,500 ft. lb. (3,400 N-m) of torque and 15,000 lb. (67 kN) of push/pull force to extremely large trailer mounted rigs with torques exceeding 60,000 ft. lb. (81,400 N-m) and over 500,000 lb. (2,200 kN) of pull. Vertical depths of horizontal wells drilled to-date have exceeded 250 feet (75 m), but the great majority of contaminant plumes are located at depths of less than 50 feet (15 m). Horizontal well displacements have exceeded 1000 feet (300 m) but most of the projects cover less than 400 feet (120 m). Wells can be drilled ''blind'' (terminate in the earth) or exit back up the earth on the other side of the plume from the drill rig

  12. Depth measurements of drilled holes in bone by laser triangulation for the field of oral implantology

    Science.gov (United States)

    Quest, D.; Gayer, C.; Hering, P.

    2012-01-01

    Laser osteotomy is one possible method of preparing beds for dental implants in the human jaw. A major problem in using this contactless treatment modality is the lack of haptic feedback to control the depth while drilling the implant bed. A contactless measurement system called laser triangulation is presented as a new procedure to overcome this problem. Together with a tomographic picture the actual position of the laser ablation in the bone can be calculated. Furthermore, the laser response is sufficiently fast as to pose little risk to surrounding sensitive areas such as nerves and blood vessels. In the jaw two different bone structures exist, namely the cancellous bone and the compact bone. Samples of both bone structures were examined with test drillings performed either by laser osteotomy or by a conventional rotating drilling tool. The depth of these holes was measured using laser triangulation. The results and the setup are reported in this study.

  13. Design of a Pneumatic Tool for Manual Drilling Operations in Confined Spaces

    Science.gov (United States)

    Janicki, Benjamin

    This master's thesis describes the design process and testing results for a pneumatically actuated, manually-operated tool for confined space drilling operations. The purpose of this device is to back-drill pilot holes inside a commercial airplane wing. It is lightweight, and a "locator pin" enables the operator to align the drill over a pilot hole. A suction pad stabilizes the system, and an air motor and flexible drive shaft power the drill. Two testing procedures were performed to determine the practicality of this prototype. The first was the "offset drill test", which qualified the exit hole position error due to an initial position error relative to the original pilot hole. The results displayed a linear relationship, and it was determined that position errors of less than .060" would prevent the need for rework, with errors of up to .030" considered acceptable. For the second test, a series of holes were drilled with the pneumatic tool and analyzed for position error, diameter range, and cycle time. The position errors and hole diameter range were within the allowed tolerances. The average cycle time was 45 seconds, 73 percent of which was for drilling the hole, and 27 percent of which was for positioning the device. Recommended improvements are discussed in the conclusion, and include a more durable flexible drive shaft, a damper for drill feed control, and a more stable locator pin.

  14. Petrochemical variation of Topopah Spring tuff matrix with depth (stratigraphic level), drill hole USW G-4, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Byers, F.M. Jr.

    1985-12-01

    This study describes and interprets petrochemical variation of the matrix (excluding fractures and large gas cavities) of the Topopah Spring Member of the Paintbrush Tuff. This tuff includes the candidate host rock for a high-level nuclear waste repository at Yucca Mountain on the Nevada Test Site. Cored hole USW G-4, near the site of a potential exploratory shaft at Yucca Mountain, penetrated 359.4 m (1179 ft) of the member within the unsaturated zone. This study shows that petrographic textures and chemistry of the matrix vary systematically within recognizable lithologic subunits related to crystallization (cooling) zones, welding (compaction) zones, and compositional zones (rhyolite versus quartz latite). The methods used for this study include petrographic modal thin section analysis using an automated counter and electron microprobe analysis of the groundmass. Distinctive textural categories are defined, and they can be ranked from finest to coarsest as vitrophyre (glass), cryptocrystalline groundmass, spherulites, granophyre, lithic fragments, and phenocrysts. The two main groundmass compositions are also defined: rhyolite high silica) and quartz latite. The value of these petrochemical studies lies in providing microscopic criteria for recognizing the zonal subunits where they may have greatly limited exposure, as in mined drifts and in core from horizontal drill holes. For example, the lower nonlithophysal zone can be distinguished microscopically from the middle nonlithophysal zone by (1) degree of compaction, (2) amount of quartz, and (3) amount of lithic fragments. The variability between these textural categories should also be considered in designing physical and chemical tests of the Topopah Spring

  15. Petrochemical variation of Topopah Spring tuff matrix with depth (stratigraphic level), drill hole USW G-4, Yucca Mountain, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Byers, F.M. Jr.

    1985-12-01

    This study describes and interprets petrochemical variation of the matrix (excluding fractures and large gas cavities) of the Topopah Spring Member of the Paintbrush Tuff. This tuff includes the candidate host rock for a high-level nuclear waste repository at Yucca Mountain on the Nevada Test Site. Cored hole USW G-4, near the site of a potential exploratory shaft at Yucca Mountain, penetrated 359.4 m (1179 ft) of the member within the unsaturated zone. This study shows that petrographic textures and chemistry of the matrix vary systematically within recognizable lithologic subunits related to crystallization (cooling) zones, welding (compaction) zones, and compositional zones (rhyolite versus quartz latite). The methods used for this study include petrographic modal thin section analysis using an automated counter and electron microprobe analysis of the groundmass. Distinctive textural categories are defined, and they can be ranked from finest to coarsest as vitrophyre (glass), cryptocrystalline groundmass, spherulites, granophyre, lithic fragments, and phenocrysts. The two main groundmass compositions are also defined: rhyolite high silica) and quartz latite. The value of these petrochemical studies lies in providing microscopic criteria for recognizing the zonal subunits where they may have greatly limited exposure, as in mined drifts and in core from horizontal drill holes. For example, the lower nonlithophysal zone can be distinguished microscopically from the middle nonlithophysal zone by (1) degree of compaction, (2) amount of quartz, and (3) amount of lithic fragments. The variability between these textural categories should also be considered in designing physical and chemical tests of the Topopah Spring.

  16. Drilling Experiments of Dummy Fuel Rods Using a Mock-up Drilling Device and Detail Design of Device for Drilling of Irradiated Nuclear Fuel Rods

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Yong; Lee, H. K.; Chun, Y. B.; Park, S. J.; Kim, B. G

    2007-07-15

    KAERI are developing the safety evaluation method and the analysis technology for high burn-up nuclear fuel rod that is the project, re-irradiation for re-instrumented fuel rod. That project includes insertion of a thermocouple in the center hole of PWR nuclear fuel rod with standard burn-up, 3,500{approx}4,000MWD/tU and then inspection of the nuclear fuel rod's heat performance during re-irradiation. To re-fabricate fuel rod, two devices are needed such as a drilling machine and a welding machine. The drilling machine performs grinding a center hole, 2.5 mm in diameter and 50 mm in depth, for inserting a thermocouple. And the welding machine is used to fasten a end plug on a fuel rod. Because these two equipment handle irradiated fuel rods, they are operated in hot cell blocked radioactive rays. Before inserting any device into hot cell, many tests with that machine have to be conducted. This report shows preliminary experiments for drilling a center hole on dummy of fuel rods and optimized drilling parameters to lessen operation time and damage of diamond dills. And the design method of a drilling machine for irradiated nuclear fuel rods and detail design drawings are attached.

  17. Design and development of a quiet, self-thrusting blast hole

    CSIR Research Space (South Africa)

    Ottermann, RW

    2001-08-01

    Full Text Available and demonstrated. The primary output of this project is a quiet, ergonomically, reliable blast hole drilling system, which is used to drill suitable blast holes by workers responsible for drilling these holes. The system has to be safe and reliable with reduced...

  18. High precision, rapid laser hole drilling

    Science.gov (United States)

    Chang, Jim J.; Friedman, Herbert W.; Comaskey, Brian J.

    2013-04-02

    A laser system produces a first laser beam for rapidly removing the bulk of material in an area to form a ragged hole. The laser system produces a second laser beam for accurately cleaning up the ragged hole so that the final hole has dimensions of high precision.

  19. Fugitive methane leak detection using mid-infrared hollow-core photonic crystal fiber containing ultrafast laser drilled side-holes

    Science.gov (United States)

    Karp, Jason; Challener, William; Kasten, Matthias; Choudhury, Niloy; Palit, Sabarni; Pickrell, Gary; Homa, Daniel; Floyd, Adam; Cheng, Yujie; Yu, Fei; Knight, Jonathan

    2016-05-01

    The increase in domestic natural gas production has brought attention to the environmental impacts of persistent gas leakages. The desire to identify fugitive gas emission, specifically for methane, presents new sensing challenges within the production and distribution supply chain. A spectroscopic gas sensing solution would ideally combine a long optical path length for high sensitivity and distributed detection over large areas. Specialty micro-structured fiber with a hollow core can exhibit a relatively low attenuation at mid-infrared wavelengths where methane has strong absorption lines. Methane diffusion into the hollow core is enabled by machining side-holes along the fiber length through ultrafast laser drilling methods. The complete system provides hundreds of meters of optical path for routing along well pads and pipelines while being interrogated by a single laser and detector. This work will present transmission and methane detection capabilities of mid-infrared photonic crystal fibers. Side-hole drilling techniques for methane diffusion will be highlighted as a means to convert hollow-core fibers into applicable gas sensors.

  20. Integrated approach towards the application of horizontal wells to improve waterflooding performance. Annual report

    Energy Technology Data Exchange (ETDEWEB)

    Kelkar, M.; Liner, C.; Kerr, D.

    1995-05-01

    This annual report describes the progress during the second year of the project on Integrated Approach Towards the Application of Horizontal Wells to Improve Waterflooding Performance. This project is funded under the Department of Energy`s Class I program which is targeted towards improving the reservoir performance of mature oil fields located in fluvial-dominated deltaic deposits. The project involves an integrated approach to characterize the reservoir followed by the drilling of horizontal injection wells to improve production performance. The type of data we have integrated include cross bore hole seismic surveys, geological interpretation based on logs and cores, and engineering information. This report covers the second phase of the project which includes a detailed reservoir description of the field by integrating all the available information, followed by flow simulation of the Self Unit under various operating conditions. Based on an examination of the various operating parameters, we observed that the best possible solution to improve the Self Unit performance is to recomplete and stimulate most of the wells followed by an increase in the water injection rate. Drilling of horizontal injection well, although helpful in improving the performance, was not found to be economically feasible. The proposed reservoir management plan will be implemented shortly.

  1. New drilling optimization technologies make drilling more efficient

    Energy Technology Data Exchange (ETDEWEB)

    Chen, D.C.-K. [Halliburton Energy Services, Calgary, AB (Canada). Sperry Division

    2004-07-01

    Several new technologies have been adopted by the upstream petroleum industry in the past two decades in order to optimize drilling operations and improve drilling efficiency. Since financial returns from an oil and gas investment strongly depend on drilling costs, it is important to reduce non-productive time due to stuck pipes, lost circulation, hole cleaning and well bore stability problems. The most notable new technologies are the use of computer-based instrumentation and data acquisition systems, integrated rig site systems and networks, and Measurement-While-Drilling and Logging-While-Drilling (MWD/LWD) systems. Drilling optimization should include solutions for drillstring integrity, hydraulics management and wellbore integrity. New drilling optimization methods emphasize information management and real-time decision making. A recent study for drilling in shallow water in the Gulf of Mexico demonstrates that trouble time accounts for 25 per cent of rig time. This translates to about $1.5 MM U.S. per well. A reduction in trouble time could result in significant cost savings for the industry. This paper presents a case study on vibration prevention to demonstrate how the drilling industry has benefited from new technologies. 13 refs., 10 figs.

  2. Experimental analysis of minimum shear stress to drag particles in a horizontal bed; Analise experimental da tensao de cisalhamento minima para arraste de particulas em um leito horizontal

    Energy Technology Data Exchange (ETDEWEB)

    Dornelas, Breno Almeida; Soares, Edson Jose [Universidade Federal do Espirito Santo. Departamento de Engenharia Mecanica (Brazil)], e-mails: bad@ucl.br, edson@ct.ufes.br; Quirino Filho, Joao Pedro; Loureiro, Bruno Venturini [Faculdade do Centro Leste (UCL). Laboratorio de Fluidos e Fenomenos de Transporte (Brazil)], e-mails: joaoquirino@ucl.br, brunovl@ucl.br

    2009-12-15

    Efficient hole cleaning is still a challenge in well bore drilling to produce oil and gas. The critical point is the horizontal drilling that inherently tends to form a bed of sediment particles at the well bottom during drilling. The cuttings bed erosion depends mainly on the shear stress promoted by the drilling fluid flow. The shear stress required to cause drag in the cuttings bed is investigated according to the fluid and particles properties, using an experimental assembly, composed of: a system for fluid circulation, a particle box, a pump system and measuring equipment. The observation area is a box below the flow line in an acrylic duct used to calibrate sand particles. The test starts with the pumps in a low frequency which is increased in steps. At each frequency level, images are captured of carried particles and the established flow rate is recorded. The images are analyzed when the dragged particle is no longer random and sporadic, but becomes permanent. The shear stress is identified by the PKN correlation (by Prandtl, von Karman, and Nikuradse) for the minimum flow rate necessary to cause drag. Results were obtained for just water and water-glycerin solution flows. (author)

  3. Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

    Energy Technology Data Exchange (ETDEWEB)

    Fairbank, Brian D. [Nevada Geothermal Power Company, Vancouver (Canada); Smith, Nicole [Nevada Geothermal Power Company, Vancouver (Canada)

    2015-06-10

    The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag

  4. Modeling pellet impact drilling process

    Science.gov (United States)

    Kovalyov, A. V.; Ryabchikov, S. Ya; Isaev, Ye D.; Ulyanova, O. S.

    2016-03-01

    The paper describes pellet impact drilling which could be used to increase the drilling speed and the rate of penetration when drilling hard rocks. Pellet impact drilling implies rock destruction by metal pellets with high kinetic energy in the immediate vicinity of the earth formation encountered. The pellets are circulated in the bottom hole by a high velocity fluid jet, which is the principle component of the ejector pellet impact drill bit. The experiments conducted has allowed modeling the process of pellet impact drilling, which creates the scientific and methodological basis for engineering design of drilling operations under different geo-technical conditions.

  5. Mesoscopic Structural Observations of Cores from the Chelungpu Fault System, Taiwan Chelungpu-Fault Drilling Project Hole-A, Taiwan

    Directory of Open Access Journals (Sweden)

    Hiroki Sone

    2007-01-01

    Full Text Available Structural characteristics of fault rocks distributed within major fault zones provide basic information in understanding the physical aspects of faulting. Mesoscopic structural observations of the drilledcores from Taiwan Chelungpu-fault Drilling Project Hole-A are reported in this article to describe and reveal the distribution of fault rocks within the Chelungpu Fault System.

  6. Stratigraphy, structure, and some petrographic features of Tertiary volcanic rocks at the USW G-2 drill hole, Yucca Mountain, Nye County, Nevada

    International Nuclear Information System (INIS)

    Maldonado, F.; Koether, S.L.

    1983-01-01

    A continuously cored drill hole penetrated 1830.6 m of Tertiary volcanic strata comprised of the following in descending order: Paintbrush Tuff, tuffaceous beds of Calico Hills, Crater Flat Tuff, lava and flow breccia (rhyodacitic), tuff of Lithic Ridge, bedded and ash-flow tuff, lava and flow breccia bedded tuff, conglomerate and ash-flow tuff, and older tuffs of USW G-2. Comparison of unit thicknesses at USW G-2 to unit thicknesses at previously drilled holes at Yucca Mountain indicate: (1) thickening of the Paintbrush Tuff members and tuffaceous beds of Calico Hills toward the northern part of Yucca Mountain; (2) thickening of the Prow Pass Member but thinning of the Bullfrog Member and Tram unit; (3) thinning of the tuff of Lithic Ridge; (4) presence of about 280 m of lava and flow breccia not previously penetrated by any drill hole; and (5) presence of an ash-flow tuff unit at the bottom of the drill hole not previously intersected, apparently the oldest unit penetrated at Yucca Mountain to date. Petrographic features of some of the units include: (1) decrease in quartz and K-feldspar and increases in biotite and plagioclase with depth in the tuffaceous beds of Calico Hills; (2) an increase in quartz phenocrysts from the top to the bottom members of the Crater Flat Tuff; (3) a low quartz content in the tuff of Lithic Ridge, suggesting tapping of the magma chamber at quartz-poor levels; (4) a change in zeolitic alteration from heulandite to clinoptilolite to mordenite with increasing depth; (5) lavas characterized by a rhyolitic top and dacitic base, suggesting reverse compositional zoning; and (6) presence of hydrothermal mineralization in the lavas that could be related to an itrusive under Yucca Mountain or to volcanism associated with the Timber Mountain-Claim Canyon caldera complex. A fracture analysis of the core resulted in tabulation of 7848 fractures, predominately open and high angle

  7. Cuttings-liquid frictional pressure loss model for horizontal narrow annular flow with rotating drillpipe

    International Nuclear Information System (INIS)

    Ofei, T N; Irawan, S; Pao, W

    2015-01-01

    During oil and gas drilling operations, frictional pressure loss is experienced as the drilling fluid transports the drilled cuttings from the bottom-hole, through the annulus, to the surface. Estimation of these pressure losses is critical when designing the drilling hydraulic program. Two-phase frictional pressure loss in the annulus is very difficult to predict, and even more complex when there is drillpipe rotation. Accurate prediction will ensure that the correct equivalent circulating density (ECD) is applied in the wellbore to prevent formation fracture, especially in formations with narrow window between the pore pressure and fracture gradient. Few researchers have attempted to propose cuttings-liquid frictional pressure loss models, nevertheless, these models fail when they are applied to narrow wellbores such as in casing- while-drilling and slimhole applications. This study proposes improved cuttings-liquid frictional pressure loss models for narrow horizontal annuli with drillpipe rotation using Dimensional Analysis. Both Newtonian and non-Newtonian fluids were considered. The proposed model constants were fitted by generated data from a full-scale simulation study using ANSYS-CFX. The models showed improvement over existing cuttings-liquid pressure loss correlations in literature. (paper)

  8. Installation of a bio-venting remediation system using directionally drilled horizontal wells

    International Nuclear Information System (INIS)

    Hardy, L.; Stolz, A.P.

    1997-01-01

    The installation of a remediation system for off-site contamination was discussed. The site was contaminated with gasoline and diesel from an abandoned bulk fuel storage and distribution terminal located near a highway. The dissolved phase hydrocarbon plume extended beneath several houses down gradient of the site. Bioventing was considered to be the only remediation option to recover the liquid phase hydrocarbons beneath the highway in a way that would satisfy all the clean-up objectives and the design constraints. Bioventing is closely related to soil vapour extraction (SVE). The main difference is that in bioventing, the mechanism for removal of contaminants is bio-degradation by indigenous bacteria, whereas in SVE, contaminants are simply removed by volatilization. Bioventing systems enhance the activity of the indigenous bacteria by inducing air flow in the subsurface through the use of vapour injection or extraction wells. Two horizontal vapour extraction wells were installed with a directional drill. A soil pile was utilized as a bio-filter for the extracted hydrocarbon vapours and a backfilled trench was used to inject vapours recovered from the soil pile to the subsurface. The total mass of hydrocarbons degraded by this system in 230 days was estimated to be 1,000 kg. It was concluded that under appropriate conditions the in-situ treatment of contaminated soil using directionally drilled wells can be justified on both economic and technical grounds. 3 refs., 1 tab., 5 figs

  9. A new drilling method-Earthworm-like vibration drilling.

    Science.gov (United States)

    Wang, Peng; Ni, Hongjian; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed "earthworm-like drilling" is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a "soft-string" model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling.

  10. Numerical investigation of the prospects of high energy laser in drilling oil and gas wells

    International Nuclear Information System (INIS)

    Agha, K.R.; Belhaj, H.A.; Mustafiz, S.; Islam, M.R.; Bjorndalen, N.

    2004-01-01

    Rotary drilling is the primary method used to reach oil and gas formations that was developed over a century ago. Many problems persist with this method, including downtime due to dull bits, the lack of precise vertical or horizontal wells and formation fluid leakage during drilling due to the lack of a seal around the hole. Laser drilling is a new technology that has been proposed as a method to eliminate the current problems while drilling and provide a less expensive alternative to conventional methods. This paper discussed the development of a numerical model based on the fundamental heat transfer and fluid flow phenomena including conduction, melting and vaporization responsible for material removal by laser drilling process. The paper addressed the thermal process involved in laser drilling of sandstone and limestone rocks as well as aluminum and mild steel. The paper outlined the parametric study and discussed the design considerations for a field application. Economical and environmental impacts were also included. It was concluded that more experimental investigation is needed to fully understand the laser operation and to enhance the integrity of the numerical models. In addition, it was concluded that field equipment must be designed to meet the changes in drilling requirements. 19 refs., 10 figs

  11. Precision hole punching on composite fiber reinforced polymer panels

    Science.gov (United States)

    Abdullah, A. B.; Zain, M. S. M.; Chan, H. Y.; Samad, Z.

    2017-12-01

    Structural materials, such as composite panels, can only be assembled, and in most cases through the use of fasteners, which are fitted into the drilled holes. However, drilling is costly and time consuming, thus affecting productivity. This research aims to develop an alternative method to drilling. In this paper, the precision of the holes was measured and the effects of the die clearance to the areas around the holes were evaluated. Measurement and evaluation were performed based on the profile of the holes constructed using Alicona IFM, a 3D surface measurement technique. Results showed that punching is a potential alternative to drilling but still requires improvements.

  12. Numerical study of influence of drilling depth and physico-mechanical characteristics of bedding of rock ores on stability of horizontal well

    International Nuclear Information System (INIS)

    Dzhukataev, Z.D.

    1997-01-01

    Stability of elastic and plastic equilibrium of deep horizontal well has been studied conformably to West Kazakhstan deposits conditions. Different forms of flat stability loss for rock ores massif are studied. This massif was weaken by deep horizontal well, on counter of this well uniformly distributed load is enclosed - pressure of drilling mortar. Linearized boundary conditions for stability are defined on the well counter and on boundary between field of elastic and inelastic deformations. The characteristic determinant is received. It is revealed, that greatest from critical pressures takes place under wave-formation by well counter equals to 1

  13. Drillings and associated drillhole measurements of the investigation holes in the EDZ tunnel at Chainage 3620

    International Nuclear Information System (INIS)

    Sacklen, N.; Hurmerinta, E.; Pekkanen, J.; Tarvainen, A.-M.; Toropainen, V.; Kosunen, P.

    2010-05-01

    The R and D programme called EDZ (Excavation Damaged Zone) programme was started in autumn 2007 according to TKS 2006 programme. To continue with EDZ programme development work the EDZ09 project was established in 2009. This report describes the R and D activities performed in the Work Package 2 'TOSI' (Verification) of EDZ09 project. The aim of the EDZ09 project was to develop the method for the verification of EDZ in different parts of the tunnel profile; to characterize the EDZ in the tunnel as well as in the shaft in order to demonstrate the applicability of the method; to complete the tasks in such a timetable that the results are available before ONKALO reaches the depth of - 420 m; to avoid unwanted changes in the bedrock around the access tunnel, which cannot be eliminated by sealing or other methods when applying the verification method or excavation techniques; to demonstrate the function of the method to be developed for verification of EDZ under construction conditions - the applicability of the method has to be demonstrated despite of changes in rock conditions and direction of underground spaces; to obtain information of EDZ in order to assess where the zone would be continuous/discontinuous; to determine the hydrological changes within the damaged zone. The experimental studies were carried out in Posiva's underground research facility, ONKALO, at the depth level c. -340 m at chainage 3620. Two parallel c. 50 m long pilot holes, ONK-PP199 and ONK-PP200, were drilled prior to the excavation of the investigation tunnel ONK-TKU-3620, the EDZ tunnel. ONK-PP199 was drilled inside and ONK-PP200 outside the EDZ tunnel profile. The purpose of the pilot holes was to acquire and adjust geological, geophysical, hydrogeological and rock mechanical knowledge prior to the excavation of the EDZ tunnel, and to define the baseline conditions close to the tunnel profile before excavation. Also, the pilot hole ONK-PP200, drilled outside the EDZ tunnel profile, was used

  14. 21 CFR 872.4130 - Intraoral dental drill.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Intraoral dental drill. 872.4130 Section 872.4130...) MEDICAL DEVICES DENTAL DEVICES Surgical Devices § 872.4130 Intraoral dental drill. (a) Identification. An intraoral dental drill is a rotary device intended to be attached to a dental handpiece to drill holes in...

  15. Geologic and geophysical data for wells drilled at Raft River Valley, Cassia County, Idaho, in 1977-1978 and data for wells drilled previously

    Science.gov (United States)

    Nathenson, Manuel; Urban, Thomas C.; Covington, Harry R.

    2014-01-01

    In order to better define the size of the thermal anomaly in the Raft River Valley, Idaho, the U.S. Geological Survey drilled a series of intermediate-depth (nominal 500-ft depth) wells in 1977 and 1978.  This report presents geologic, geophysical, and temperature data for these drill holes, along with data for five wells drilled by the Idaho National Engineering Laboratory with U.S. Department of Energy Funding.  Data previously reported for other drill holes are also included in order to make them available as digital files.

  16. Methods to ensure optimal off-bottom and drill bit distance under pellet impact drilling

    Science.gov (United States)

    Kovalyov, A. V.; Isaev, Ye D.; Vagapov, A. R.; Urnish, V. V.; Ulyanova, O. S.

    2016-09-01

    The paper describes pellet impact drilling which could be used to increase the drilling speed and the rate of penetration when drilling hard rock for various purposes. Pellet impact drilling implies rock destruction by metal pellets with high kinetic energy in the immediate vicinity of the earth formation encountered. The pellets are circulated in the bottom hole by a high velocity fluid jet, which is the principle component of the ejector pellet impact drill bit. The paper presents the survey of methods ensuring an optimal off-bottom and a drill bit distance. The analysis of methods shows that the issue is topical and requires further research.

  17. Characterization of rotary-percussion drilling as a seismic-while-drilling source

    Science.gov (United States)

    Xiao, Yingjian; Hurich, Charles; Butt, Stephen D.

    2018-04-01

    This paper focuses on an evaluation of rotary-percussion drilling (RPD) as a seismic source. Two field experiments were conducted to characterize seismic sources from different rocks with different strengths, i.e. weak shale and hard arkose. Characterization of RPD sources consist of spectral analysis and mean power measurements, along with field measurements of the source radiation patterns. Spectral analysis shows that increase of rock strength increases peak frequency and widens bandwidth, which makes harder rock more viable for seismic-while-drilling purposes. Mean power analysis infers higher magnitude of body waves in RPD than in conventional drillings. Within the horizontal plane, the observed P-wave energy radiation pattern partially confirms the theoretical radiation pattern under a single vertical bit vibration. However a horizontal lobe of energy is observed close to orthogonal to the axial bit vibration. From analysis, this lobe is attributed to lateral bit vibration, which is not documented elsewhere during RPD. Within the horizontal plane, the observed radiation pattern of P-waves is generally consistent with a spherically-symmetric distribution of energy. In addition, polarization analysis is conducted on P-waves recorded at surface geophones for understanding the particle motions. P-wave particle motions are predominantly in the vertical direction showing the interference of the free-surface.

  18. Interpretation of geophysical well-log measurements in drill hole UE25a-1, Nevada Test Site, Radioactive Waste Program

    International Nuclear Information System (INIS)

    Hagstrum, J.T.; Daniels, J.J.; Scott, J.H.

    1980-01-01

    An exploratory hole (UE25a-1) was drilled at Nevada Test Site (NTS) to determine the suitability of pyroclastic deposits as storage sites for radioactive waste. Studies have been conducted to investigate the stratigraphy, structure, mineralogy, petrology, and physical properties of the tuff units encountered in the drill hole. This report deals with the interpretation of physical properties for the tuff units from geophysical well-log measurements. The ash-flow and bedded tuff sequences at NTS comprise complex lithologies of variously welded tuffs with superimposed crystallization and altered zones. To characterize these units, resistivity, density, neutron, gamma-ray, induced polarization, and magnetic susceptibility geophysical well-log measurements were made. Although inherently subjective, a consistent interpretation of the well-log measurements was facilitated by a computer program designed to interpret well logs either individually or simultaneously. The broad features of the welded tuff units are readily distinguished by the geophysical well-log measurements. However, many details revealed by the logs indicate that more work is necessary to clarify the casual elements of well-log response in welded tuffs

  19. Horizontal well drilled to intersect existing vertical well

    International Nuclear Information System (INIS)

    Price, C.; Reynolds, J.

    1991-01-01

    Morse oilfield, in eastern Gray County of the Texas Panhandle, was originally developed between 1928 and 1937. It is but a very small part of the huge Texas Pandhandle field, which covers over 200,000 productive acres, containing 12,500 active wells with a cumulative production of one billion barrels of oil. The field produces from Permian age dolomites and the Pennsylvanian Granite Wash. This paper reports on multiple production techniques that have been used over the years with varying levels of success. Acidizing techniques in the late 1930s increased development, but the advent of hydraulic fracturing resulted in extensive development. The primary drive mechanism was solution-gas drive. Approximately one-fourth of Panhandle field has been subjected to gas injection, resulting in an estimated 50 million barrels of additional oil production. In 1955, waterflooding appeared to offer the most economical possibility of increasing ultimate recovery from the Brown Dolomite reservoir. The Morse Brown Dolomite pilot flood in Gray County and another Brown Dolomite pilot flood in Hutchinson County were the first two successful pilot floods in Panhandle field. The Morse flood has a total of 40 oil and 27 water injection wells on 500 flood acres. Morse field has a cumulative production of 15.7 million barrels of oil. The operating company, Future Petroleum Corp., a Dallas-based independent, believes that a third alternative using horizontal drilling has the potential to increase production. And it appears that the Brown Dolomite formation of Morse field offers the right combination of factors to attempt this type of venture

  20. Extended Reach Drilling on the example of Reelwell Drilling Method: Influence examination of different drill pipes on drilling performance on Idun field on the Norwegian Continental Shelf by PGNiG Norway AS.

    OpenAIRE

    Krol, Dariusz Pawel

    2011-01-01

    Master's thesis in Petroleum engineering Horizontal or extended reach drilling is incredibly fast growing technology. Although in some areas of the world ERD is still novelty, most of oil companies have been using the technology reliably and successfully for dozens of years. And those companies want to improve well-worn solutions to obtain better performance, thereby reducing costs. One of the main aspects that affects drilling performance and efficiency is adequate choice of drill pipe...

  1. Application of multiphase flow methods to horizontal underbalanced drilling

    Energy Technology Data Exchange (ETDEWEB)

    Smith, S. P.; Gregory, G. A.; Munro, N.; Muqeem, M.

    1998-12-31

    Ways in which multiphase flow pressure loss calculations can be used in the design and optimization of underbalanced drilling operations are demonstrated. Existing pressure loss calculation methods are evaluated using detailed field measurements for three oil wells and one gas well drilled underbalanced with coiled tubing. 10 refs., 3 tabs., 17 figs.

  2. Flux dynamics and magnetovoltage measurements in a macroscopic cylindrical hole drilled in BSCCO

    International Nuclear Information System (INIS)

    Yetis, H.; Altinkok, A.; Olutas, M.; Kilic, A.; Kilic, K.

    2007-01-01

    Slow transport relaxation measurements (V-t curves) and magnetovoltage measurements (V-H curves) were carried out in a polycrystalline sample of Bi 1.7 Pb 0.3 Sr 2 Ca 2 Cu 3 O x (BSCCO) with a macroscopic cylindrically drilled hole (CH). The time evolution of quenched state in V-t curves was interpreted in terms of enhancement of the superconducting order parameter and the relaxation of moving entity. Upon cycling of the external magnetic field with different sweep rates, unusual counter clockwise hysteresis effects and asymmetry in V-H curves are observed in BSCCO sample with CH, which can also be correlated to the trapping of the macroscopic flux bundles in CH

  3. Flux dynamics and magnetovoltage measurements in a macroscopic cylindrical hole drilled in BSCCO

    Science.gov (United States)

    Yetiş, H.; Altinkok, A.; Olutaş, M.; Kiliç, A.; Kiliç, K.

    2007-10-01

    Slow transport relaxation measurements (V-t curves) and magnetovoltage measurements (V-H curves) were carried out in a polycrystalline sample of Bi1.7Pb0.3Sr2Ca2Cu3Ox (BSCCO) with a macroscopic cylindrically drilled hole (CH). The time evolution of quenched state in V-t curves was interpreted in terms of enhancement of the superconducting order parameter and the relaxation of moving entity. Upon cycling of the external magnetic field with different sweep rates, unusual counter clockwise hysteresis effects and asymmetry in V-H curves are observed in BSCCO sample with CH, which can also be correlated to the trapping of the macroscopic flux bundles in CH.

  4. Gaspe hole sets depth record

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-09

    The deepest diamond-cored hole in the Western Hemisphere, Gulf Sunnybank No. 1 on the Gaspe Peninsula of Quebec, has been completed at a depth of 11,600 ft. This is the deepest cored hole to be drilled anywhere in search of oil and gas production, and the deepest to be drilled using a wire-line core recovery technique. The well was completed in 183 days, and was cored continuously below the surface casing which was set and cemented at 1,004 ft. After underreaming a portion of the bottom of the hole, intermediate casing was set and cemented at 8,000 ft as a safety precaution against possible high oil or gas-fluid pressure. Actual coring time, after deducting time for underreaming and casing operations, was 152 days. Because of the cost of transporting a conventional oil-drilling rig to the E. location, the 89-ft mining rig was modified for the project. The contractor was Heath and Sherwood Drilling (Western) Ltd.

  5. Operational Review of the First Wireline In Situ Stress Test in Scientific Ocean Drilling

    Directory of Open Access Journals (Sweden)

    Casey Moore

    2012-04-01

    Full Text Available Scientific ocean drilling’s first in situ stress measurement was made at Site C0009A during Integrated Ocean Drilling Program (IODP Expedition 319 as part of Nankai Trough Seismogenic Zone Experiment (NanTroSEIZE Stage 2. The Modular Formation Dynamics Tester (MDT, Schlumbergerwireline logging tool was deployed in riser Hole C0009A to measure in situ formation pore pressure, formation permeability (often reported as mobility=permeability/viscosity, and the least principal stress (S3 at several isolated depths (Saffer et al., 2009; Expedition 319 Scientists, 2010. The importance of in situ stress measurements is not only for scientific interests in active tectonic drilling, but also for geomechanical and well bore stability analyses. Certain in situ tools were not previously available for scientific ocean drilling due to the borehole diameter and open hole limits of riserless drilling. The riser-capable drillship, D/V Chikyu,now in service for IODP expeditions, allows all of the techniques available to estimate the magnitudes and orientations of 3-D stresses to be used. These techniques include downhole density logging for vertical stress, breakout and caliper log analyses for maximum horizontal stress, core-based anelastic strain recovery (ASR, used in the NanTroSEIZE expeditions in 2007–2008, and leak-off test (Lin et al., 2008 and minifrac/hydraulic fracturing (NanTroSEIZE Expedition319 in 2009. In this report, the whole operational planning process related to in situ measurements is reviewed, and lessons learned from Expedition 319 are summarized for efficient planning and testing in the future.

  6. A new drilling method—Earthworm-like vibration drilling

    Science.gov (United States)

    Wang, Peng; Wang, Ruihe

    2018-01-01

    The load transfer difficulty caused by borehole wall friction severely limits the penetration rate and extended-reach limit of complex structural wells. A new friction reduction technology termed “earthworm-like drilling” is proposed in this paper to improve the load transfer of complex structural wells. A mathematical model based on a “soft-string” model is developed and solved. The results show that earthworm-like drilling is more effective than single-point vibration drilling. The amplitude and frequency of the pulse pressure and the installation position of the shakers have a substantial impact on friction reduction and load transfer. An optimization model based on the projection gradient method is developed and used to optimize the position of three shakers in a horizontal well. The results verify the feasibility and advantages of earthworm-like drilling, and establish a solid theoretical foundation for its application in oil field drilling. PMID:29641615

  7. Measurements of the state of stress in deep drill holes

    International Nuclear Information System (INIS)

    Vaeaetaeinen, A.; Saerkkae, P.

    1985-05-01

    The state of stress in rock is one of the most important parameters in the safe planning of stable underground openings in rock. At the same time, it is very difficult to be determined from a great distance. The common methods for the determination of state of stress in bedrock are usually not able to do this from a distance over 30 m. This work is a survey on rock stress determination methods usable in deep, over 500 m, drill holes. It also contains a recommendation for a method to determine the state of stress in Lavia test hole. The presented recommendation for the measurement of the state of stress contains an estimation on the working time for the measurement as well as the amount and location of the measuring points. The examination of the methods has been concentrated on three methods, hydraulic fracturing, overcoring by Vattenfall and differential strain analysis. Theoretical background of these methods has been analyzed. A special interest has been laid on the fundamental assumptions of different methods and their influence on the reliability of the results and the interpretation of the state of stress. The comparison of the methods has been made by literature and user interviews. Equipment and personnel needed, and way of measurement are described for the methods. The parameters measured and their possible sources of errors are described, too, as well as the fundamental assumptions and potential difficulties in the measurement. The organizations in Scandinavia performing measurements and their abilities to do measurements and interpretation are presented. Readiness to interpretation in Finland is described shortly

  8. A vision for drilling

    Energy Technology Data Exchange (ETDEWEB)

    Millheim, K. [Montanuniversitaet Leoben (Austria)

    1995-12-31

    The future of drilling lies in its relationship with the oil and gas industry. This paper examines how the future of drilling is seen from the view point of the exploration manager, the drilling contractor, the drilling engineer and the company president or managing director. The various pressures on the oil and gas industry are examined, such as environmental issues, alternative energy sources, and the price of oil which determines how companies are run. Exploration activity is driven by the price of oil and gas. The development of wells with multiple horizontal wells or multiple horizontal wells with tributaries will reduce the cost of exploration. Companies will rely less and less on reservoir simulation and more on cheap well-bores, multi-lateral well-bores and will exploit oil that could not be exploited before. The cost of exploratory drilling will need to be kept down so that in the future the industry will get better at economically finding fields at the 10 million to 20 million barrel range that would not have been possible before. The future is expected to see drilling contractors tunnelling, making sewerage lines and drilling 10,000 foot wells with purpose built rigs. Franchising will become a feature of the industry as will the use of databases to answer key technical questions. Offshore platforms will be built to be moveable and disposable. The industry is capable of solving problems, meeting challenges and making ideas work, providing much hope for the future. 10 figs., 1 photo.

  9. Geology of the UE17e drill hole, Area 17, Nevada Test Site

    International Nuclear Information System (INIS)

    Hodson, J.N.; Hoover, D.L.

    1979-03-01

    The UE17e drill hole, located at the northwest corner of Syncline Ridge, was cored from 3.05 m (10 ft) to a total depth of 914.4 m (3,000 ft) in unit J (Mississippian) of the Eleana (Devonian and Mississippian) to obtain samples for mineral, chemical, and physical-property analyses. UE17e penetrated 73.5 m (241 ft) of the quartzite subunit and 840.9 m (2,759 ft) of the argillite subunit of unit J. Less than 0.4 percent quartzite is present in the argillite subunit. Dips range from 12 0 to 18 0 . Twenty-three faults were observed in the core or on geophysical logs. Most of these faults affect only a few meters of the core and probably have displacements of a few meters. The majority of fractures are parallel to bedding planes. Fracture frequency ranges from 3.4 to 9.4 fractures per meter in the upper part of the cored interval and 1.4 to 5.9 fractures per meter in the lower part of the cored interval. The core index indicates that the lower part of the hole is more competent than the upper part. Lower competency in the upper part of the hole may be caused by weathering and/or near-surface stress relief. Physical, mechanical, and thermal property measurements indicate that bedding and fracturing are the major factors in variation of properties between samples. 17 figures, 10 tables

  10. Oman Drilling Project Phase I Borehole Geophysical Survey

    Science.gov (United States)

    Matter, J. M.; Pezard, P. A.; Henry, G.; Brun, L.; Célérier, B.; Lods, G.; Robert, P.; Benchikh, A. M.; Al Shukaili, M.; Al Qassabi, A.

    2017-12-01

    The Oman Drilling Project (OmanDP) drilled six holes at six sites in the Samail ophiolite in the southern Samail and Tayin massifs. 1500-m of igneous and metamorphic rocks were recovered at four sites (GT1, GT2, GT3 and BT1) using wireline diamond core drilling and drill cuttings at two sites (BA1, BA2) using air rotary drilling, respectively. OmanDP is an international collaboration supported by the International Continental Scientific Drilling Program, the Deep Carbon Observatory, NSF, NASA, IODP, JAMSTEC, and the European, Japanese, German and Swiss Science Foundations, and with in-kind support in Oman from Ministry of Regional Municipalities and Water Resources, Public Authority of Mining, Sultan Qaboos University and the German University of Technology. A comprehensive borehole geophysical survey was conducted in all the OmanDP Phase I boreholes shortly after drilling in April 2017. Following geophysical wireline logs, using slim-hole borehole logging equipment provided and run by the Centre National De La Recherche Scientifique (CNRS) and the Université de Montpellier/ Géosciences Montpellier, and logging trucks from the Ministry of Regional Municipalities and Water Resources, were collected in most of the holes: electrical resistivity (dual laterolog resistivity, LLd and LLs), spectral gamma ray (K, U, and Th contents), magnetic susceptibility, total natural gamma ray, full waveform sonic (Vp and Vs), acoustic borehole wall imaging, optical borehole wall imaging, borehole fluid parameters (pressure, temperature, electrical conductivity, dissolved oxygen, pH, redox potential, non-polarized spontaneous electrical potential), and caliper (borehole diameter). In addition, spinner flowmeter (downhole fluid flow rate along borehole axis) and heatpulse flow meter logs (dowhole fluid flow rate along borehole axis) were collected in BA1 to characterize downhole fluid flow rates along borehole axis. Unfortuantely, only incomplete wireline logs are available for

  11. Machining of the nuclear tube sheet with small hole diameter

    International Nuclear Information System (INIS)

    Lin Lifeng

    2010-01-01

    Regarding the tube sheet for the heat exchanger of Qinshan Phase II extension project, its material is 00Cr19Ni10 forgings, the tube sheet thickness is 125 mm, requiring 178-φ10.35 0 +0.05 hole, the tube array shall take the shape of equilateral triangle, the center distance is 15 mm, and the tube hole roughness is Ra 3.2. The guide sleeve shall be adopted for positioning prior to machining of the high precision small hole of the thick tube sheet, and the gun drill and BTA drill shall be adopted for testing, finally BTA drilling with internal chip removal shall be adopted, this method shall overcome the disadvantage factor of BTA drilling and shall be the new approach for drilling. The diameter of BTA drill is φ10.34 mm. The machined hole diameter shall be φ10.375-φ10.355 mm. The ellipticity of the tube hole shall be less than 0.01 mm, the pipe bridge dimension shall be 4.6 mm, conforming to the requirement of the drawing. The paper presents the precautions during machining so as to provide the reference for the similar pipe hole machining in the future. (author)

  12. Evaluation of machining effect for the residual stress of SA508 by hole drilling method

    International Nuclear Information System (INIS)

    Lee, Jeong Kun; Lee, Kyoung Soo; Song, Ki O; Kim, Young Shin

    2009-01-01

    Residual stresses on a surface of the material are welcome or undesirable since it's direction, compression or tensile. But especially for the fatigue, it is not negligible effect on the material strength. These residual stresses developed during the manufacturing processes involving material deformation, heat treatment, machining. The object of this paper is verifying the effect of machining what is mostly used for SA508. For verifying the effect of machining, three different kind of machining have been achieved, milling, grinding, wire cutting. Also to measure the residual stress, hole drill method and indentation method are used.

  13. Flux dynamics and magnetovoltage measurements in a macroscopic cylindrical hole drilled in BSCCO

    Energy Technology Data Exchange (ETDEWEB)

    Yetis, H.; Altinkok, A.; Olutas, M. [Abant Izzet Baysal University, Department of Physics, Turgut Gulez Research Laboratory, 14280 Bolu (Turkey); Kilic, A. [Abant Izzet Baysal University, Department of Physics, Turgut Gulez Research Laboratory, 14280 Bolu (Turkey)], E-mail: kilic_a@ibu.edu.tr; Kilic, K. [Abant Izzet Baysal University, Department of Physics, Turgut Gulez Research Laboratory, 14280 Bolu (Turkey)

    2007-10-01

    Slow transport relaxation measurements (V-t curves) and magnetovoltage measurements (V-H curves) were carried out in a polycrystalline sample of Bi{sub 1.7}Pb{sub 0.3}Sr{sub 2}Ca{sub 2}Cu{sub 3}O{sub x} (BSCCO) with a macroscopic cylindrically drilled hole (CH). The time evolution of quenched state in V-t curves was interpreted in terms of enhancement of the superconducting order parameter and the relaxation of moving entity. Upon cycling of the external magnetic field with different sweep rates, unusual counter clockwise hysteresis effects and asymmetry in V-H curves are observed in BSCCO sample with CH, which can also be correlated to the trapping of the macroscopic flux bundles in CH.

  14. Experimental Study on Environment Friendly Tap Hole Clay for Blast Furnace

    Science.gov (United States)

    Siva kumar, R.; Mohammed, Raffi; Srinivasa Rao, K.

    2018-03-01

    Blast furnace (BF) is the best possible route of iron production available. Blast furnace is a high pressure vessel where iron ore is melted and liquid iron is produced. The liquid iron is tapped through the hole in Blast Furnace called tap hole. The tapped liquid metal flowing through the tap hole is plugged using a clay called tap hole clay. Tap hole clay (THC) is a unshaped refractory used to plug the tap hole. The tap hole clay extruded through the tap hole using a gun. The tap hole clay is designed to expand and plug the tap hole. The tap hole filled with clay is drilled using drill bit and the hole made through the tap hole to tap the liquid metal accumulated inside the furnace. The number of plugging and drilling varies depending on the volume of the furnace. The tap hole clay need to have certain properties to avoid problems during plugging and drilling. In the present paper tap hole clay properties in industrial use was tested and studied. The problems were identified related to tap hole clay manufacturing. Experiments were conducted in lab scale to solve the identified problems. The present composition was modified with experimental results. The properties of the modified tap hole clay were found suitable and useful for blast furnace operation with lab scale experimental results.

  15. ResonantSonic drilling. Innovative technology summary report

    International Nuclear Information System (INIS)

    1995-04-01

    The technology of ResonantSonic drilling is described. This technique has been demonstrated and deployed as an innovative tool to access the subsurface for installation of monitoring and/or remediation wells and for collection of subsurface materials for environmental restoration applications. The technology uses no drilling fluids, is safe and can be used to drill slant holes

  16. Simulation of friction stir drilling process

    Science.gov (United States)

    Vijayabaskar, P.; Hynes, N. Rajesh Jesudoss

    2018-05-01

    The project is the study of the thermal drilling process. The process is a hole forming process in the sheet metals using the heat generated by means of friction. The main advantage of the process over the conventional drilling process is that the holes formed using this process does not need any backing arrangements such as weld nuts, rivet nuts etc. Because the extruded bush itself acts as a supporting structure for the fasteners. This eliminates the need for the access to the backside of the work material for fastening operations. The major factors contributing the thermal drilling operation are the spindle speed and the thrust force required for forming a hole. The process of finding out the suitable thrust force and the speed for drilling a particular material with particular thickness is a tedious process. The process can be simplified by forming a mathematical model by combining the empirical formulae from the literature. These formulae were derived in the literature from the experimental trials by following certain assumptions. In this paper a suitable mathematical model is formed by replicating the experiments and tried to be validated by the results from numerical analysis. The numerical analysis of the model is done using the ANSYS software.

  17. Drill machine guidance using natural occurring radiation

    International Nuclear Information System (INIS)

    Dahl, H.D.; Schroeder, R.L.; Williams, B.J.

    1980-01-01

    A drilling machine guidance system is described which uses only the naturally occuring radiation within the seam or stratum of interest. The apparatus can be used for guiding horizontal drilling machines through coal seams and the like. (U.K.)

  18. A comparative evaluation of drilling techniques for deposits containing free gold using radioactive gold particles as tracers

    International Nuclear Information System (INIS)

    Clarkson, R.

    1998-01-01

    In the summers of 1992 and 1994, the author designed and carried out a statistically valid research program using radioactivated gold particles as tracers (radiotracers). Two types of fully cased normal circulation (N / C) drills, two types of reverse circulation (R/C) drills and three solid auger drills were evaluated under a variety of field conditions. A frozen cylindrical core of compacted gravels containing four sizes ( 1.2, 0.60, 0.30 and 0.15 mm), (+l4,+28,+48and+100 mesh)of radiotracers was placed in 44 drill holes and the holes were re drilled. Scintillometers were used to track free gold losses due to spillage and blow-by around the collar (top) of the hole. Some gold particles were located in temporary traps in the drilling equipment and these particles would have contaminated subsequent samples (as carry-over). Several myths commonly attributed to particular drilling methods were dispelled. There was no significant difference between the recovery of the four sizes of gold particles with any of the drills tested. Observations and down-hole scintillometer records indicated that the free gold particles did not follow the bit down the hole and were either carried out of the hole or forced onto the sides of the hole at or above the depth at which the radioactive gold was positioned. A comparative evaluation of the results of these tests is presented

  19. Listvenite formation from peridotite: Insights from Oman Drilling Project hole BT1B and preliminary reaction path model approach.

    Science.gov (United States)

    de Obeso, J. C.; Kelemen, P. B.; Manning, C. E.; Michibayashi, K.; Harris, M.

    2017-12-01

    Oman Drilling Project hole BT1B drilled 300 meters through the basal thrust of the Samail ophiolite. The first 200 meters of this hole are dominated by listvenites (completely carbonated peridotites) and serpentinites. Below 200 meters the hole is mainly composed of metasediments and metavolcanics. This core provides a unique record of interaction between (a) mantle peridotite in the leading edge of the mantle wedge and (b) hydrous, CO2 rich fluids derived from subducting lithologies similar to those in the metamorphic sole. We used EQ3/6 to simulate a reaction path in which hydrous fluid in equilibrium with qtz + calcite + feldspar + chlorite or smectite reacts with initially fresh peridotite at 100°C (the estimated temperature of alteration, Falk & Kelemen GCA 2015) and 5 kb. Water was first equilibrated with minerals observed during core description in the metamorphic sole at 100°C and 5kb. This fluid is then reacted with olivine enstatite and diopside (Mg#90) approximating the average composition of residual mantle peridotite (harzburgite) in Oman. Secondary minerals resulting from complete reaction are then reacted again with the initial fluid in an iterative process, up to water/rock > 1000. Water/rock close to 1 results in complete serpentinization of the peridotite, with chrysotile, brucite and magnetite as the only minerals. Water/rock >10 produces carbonates, chlorite and talc. Further increasing water/rock to > 100 produces assemblages dominated by carbonates and quartz with minor muscovite, similar to listvenites of hole BT1B that contain qtz + carbonates + Fe-oxyhydroxides + relict spinel ± chromian muscovite and fuchsite. The results of this preliminary model are consistent with the complex veining history of core from BT1B, with carbonate/iron oxide veins in both listvenites and serpentinites interpreted to be the earliest record of peridotite carbonation after initial serpentinization.

  20. A study for high accuracy measurement of residual stress by deep hole drilling technique

    Science.gov (United States)

    Kitano, Houichi; Okano, Shigetaka; Mochizuki, Masahito

    2012-08-01

    The deep hole drilling technique (DHD) received much attention in recent years as a method for measuring through-thickness residual stresses. However, some accuracy problems occur when residual stress evaluation is performed by the DHD technique. One of the reasons is that the traditional DHD evaluation formula applies to the plane stress condition. The second is that the effects of the plastic deformation produced in the drilling process and the deformation produced in the trepanning process are ignored. In this study, a modified evaluation formula, which is applied to the plane strain condition, is proposed. In addition, a new procedure is proposed which can consider the effects of the deformation produced in the DHD process by investigating the effects in detail by finite element (FE) analysis. Then, the evaluation results obtained by the new procedure are compared with that obtained by traditional DHD procedure by FE analysis. As a result, the new procedure evaluates the residual stress fields better than the traditional DHD procedure when the measuring object is thick enough that the stress condition can be assumed as the plane strain condition as in the model used in this study.

  1. Ice drilling for blasting boreholes in deep seismic surveys (JARE-43 by steam type drilling system

    Directory of Open Access Journals (Sweden)

    Atsushi Watanabe

    2003-03-01

    Full Text Available A seismic exploration was accomplished in the austral summer of 2001-2002 by the 43rd Japanese Antarctic Research Expedition (JARE-43 along a profile oblique to that held by JARE-41 on the Mizuho Plateau, East Antarctica. We used a steam type drilling system to obtain seven blasting boreholes. We spent 7 to 8 hours to make an enough depth of the hole for one shot point. The holes were 35 to 40 cm in diameter and 23.5 to 28.7 m in depth. The average drilling speed was 3.25 m/hr.

  2. Diagnostic System of Drill Condition in Laminated Chipboard Drilling Process

    Directory of Open Access Journals (Sweden)

    Swiderski Bartosz

    2017-01-01

    Full Text Available The paper presents an on-line automatic system for recognition of the drill condition in a laminated chipboard drilling process. Two states of the drill are considered: the sharp enough (still able to drill holes acceptable for processing quality and worn out (excessive drill wear, not satisfactory from the quality point of view of the process. The automatic system requires defining the diagnostic features, which are used as the input attributes to the classifier. The features have been generated from 5 registered signals: feed force, cutting torque, noise, vibration and acoustic emission. The statistical parameters defined on the basis of the auto regression model of these signals have been used as the diagnostic features. The sequential step-wise feature selection is applied for choosing the most discriminative set of features. The final step of recognition is done by support vector machine classifier working in leave one out mode. The results of numerical experiments have confirmed good quality of the proposed diagnostic system.

  3. Experimental Analysis of the Influence of Drill Point Angle and Wear on the Drilling of Woven CFRPs

    Directory of Open Access Journals (Sweden)

    Norberto Feito

    2014-05-01

    Full Text Available This paper focuses on the effect of the drill geometry on the drilling of woven Carbon Fiber Reinforced Polymer composite (CFRPs. Although different geometrical effects can be considered in drilling CFRPs, the present work focuses on the influence of point angle and wear because they are the important factors influencing hole quality and machining forces. Surface quality was evaluated in terms of delamination and superficial defects. Three different point angles were tested representative of the geometries commonly used in the industry. Two wear modes were considered, being representative of the wear patterns commonly observed when drilling CFRPs: flank wear and honed cutting edge. It was found that the crossed influence of the point angle and wear were significant to the thrust force. Delamination at the hole entry and exit showed opposite trends with the change of geometry. Also, cutting parameters were checked showing the feed’s dominant influence on surface damage.

  4. Lessons learned from installation of an environmental horizontal well

    International Nuclear Information System (INIS)

    Oakley, D.B.; Nickelson, M.D.

    1994-01-01

    At Williams Air Force Base near Phoenix, Arizona, a Pilot Study/Demonstration Study is being performed to evaluate the effectiveness of horizontal vs vertical wells in remediating and containing a jet fuel contaminant plume. An early stage of this project included successful installation of the world's longest, deepest environmental horizontal well. The horizontal well was installed using river crossing technology developed for drilling boreholes and installing utility conduits under rivers. Boreholes more than 5,000 ft. long have been successfully installed using river crossing technology. However, these boreholes are typically shallower than 100 ft. below land surface. Installation of the environment horizontal well proved to be extremely challenging because of the depth, the length of the borehole, and the requirements dictated by well installation criteria. Two installation attempts failed before the successful installation. The first installation attempt failed during well material installation. The second attempt resulted in the drill string becoming permanently stuck and abandoned downhole. The history of the two failed and one successful installation attempts demonstrates several lessons learned, including (1) streamline the well materials installation process as much as possible; (2) guar-gum-based drilling muds do not have the gel strength to remove sufficient cuttings from deep boreholes; (3) if sandpack around the well screen is required, a prepack screen should be installed--avoid using tremie pipes for installing a sandpack; (4) drill string location information provided by surface magnetic systems is unreliable at 150 ft. or more bls; and (5) for difficult drilling conditions, 24 hr./day drilling is recommended

  5. Experimental assessment of borehole wall drilling damage in basaltic rocks

    International Nuclear Information System (INIS)

    Fuenkajorn, K.; Daemen, J.J.K.

    1986-06-01

    Ring tension tests, permeability tests, and microscopic fracture studies have been performed to investigate the borehole damage induced at low confining pressure by three drilling techniques (diamond, percussion and rotary). Specimens are drilled with three hole sizes (38, 76, and 102 mm diameter) in Pomona basalt and Grande basaltic andesite. The damaged zone is characterized in terms of fractures and fracture patterns around the hole, and in terms of tensile strength reduction of the rock around the holes. Experimental results show that the thickness of the damaged zone around the hole ranges from 0.0 to 1.7 mm. A larger drill bit induces more wall damage than does a smaller one. Different drilling techniques show different damage characteristics (intensity and distribution). Damage characteristics are governed not only by drilling parameters (bit size, weight on bit, rotational speed, diamond radius, and energy), but also by properties of the rock. The weaker rock tends to show more intense damage than does the stronger one. Cracks within grains or cleavage fractures are predominant in slightly coarser grained rock (larger than 0.5 mm grain size) while intergranular cracks are predominant in very fine grained rock (smaller than 0.01 mm grain size). The damaged zones play no significant role in the flow path around a borehole plug

  6. Automated steering systems applied to complex horizontal well in South Italy

    Energy Technology Data Exchange (ETDEWEB)

    Calderoni, A.; Ligrone, A.; Trampini, A. [ENI AGIP (Italy); Oppelt, J.; Gauld, S. [Baker Hughes INTEQ (United States)

    1998-12-31

    A new drilling system that not only improved the quality of the borehole trajectory, but also resulted in significant savings in capital cost is described. The new concept in drilling is the result of a joint development between a major oil company and an oilfield service provider. Through providing a breakthrough technology in directional steering systems the accuracy of the borehole steering has been substantially improved. The new concept involves the use of a straight hole drilling system (SDD) in the upper hole section, in combination with the rotary steering system, AutoTrak, in the 8.5 inch hole size. By synergistically using the new automated tools, the well was drilled much more efficiently than offset wells, producing substantial time savings, a smoother trajectory and less friction. Details of the different automated directional drilling systems that were used together in a well for the first time at Monte Enoc 9 in South Italy are described. 2 refs., 3 tabs., 9 figs.

  7. Application of Numerical Simulation for the Analysis of the Processes of Rotary Ultrasonic Drilling

    Science.gov (United States)

    Naď, Milan; Čičmancová, Lenka; Hajdu, Štefan

    2016-12-01

    Rotary ultrasonic machining (RUM) is a hybrid process that combines diamond grinding with ultrasonic machining. It is most suitable to machine hard brittle materials such as ceramics and composites. Due to its excellent machining performance, RUM is very often applied for drilling of hard machinable materials. In the final phase of drilling, the edge deterioration of the drilled hole can occur, which results in a phenomenon called edge chipping. During hole drilling, a change in the thickness of the bottom of the drilled hole occurs. Consequently, the bottom of the hole as a plate structure is exposed to the transfer through the resonance state. This resonance state can be considered as one of the important aspects leading to edge chipping. Effects of changes in the bottom thickness and as well as the fillet radius between the wall and bottom of the borehole on the stress-strain states during RUM are analyzed.

  8. Drilling in tempered glass – modelling and experiments

    DEFF Research Database (Denmark)

    Nielsen, Jens Henrik

    The present paper reports experimentally and numerically obtained results for the process of drilling in tempered glass. The experimental results are drilling depths on the edge in 19mm tempered glass with a known residual stress state measured by a scattered light polariscope. The experiments have...... been modelled using a state-of-the-art model and compared with satisfying result to the performed experiments. The numerical model has been used for a parametric study, investigating the redistribution of residual stresses during the process of drilling. This is done for investigating the possibility...... of applying forces in such holes and thereby being able to mechanically assemble tempered glass without the need of drilling holes before the tempering process. The paper is the result of currently ongoing research and the results should be treated as so....

  9. Behavior of water jet horizontally discharged from a small circular hole set on a circular pipe-surface into air

    International Nuclear Information System (INIS)

    Tsuyuki, Koji; Igarashi, Saburo; Sudo, Seiichi; Yamabe, Masahiro; Kikuchi, Akira; Oba, Risaburo

    2001-01-01

    In order to clarify the behavior of the water jet horizontally discharged from a small circular hole set on a circular pipe surface into air, in this paper, for the first step, we systematically observed the jet aspects, the efflux angle, the discharge coefficient and so on, when the hole diameter d is much smaller than the pipe diameter D. Since the upstream kinetic energy from the hole is somewhat higher than the downstream counterpart, the upstream partial jet with higher efflux angle crashes into the downstream partial jet and drives out the latter into up- and down-side, resulting in a marked pair of vortices, so that resulting in a three-dimensional spiral flow accompanying with marked surface waves. (author)

  10. Analysis of Single-Hole and Cross-Hole Tracer Tests Conducted at the Nye County Earl Warning Drilling Program Well Complex, Nye County, Nevada

    International Nuclear Information System (INIS)

    A. Umari; J.D. Earle; M.F. Fahy

    2006-01-01

    As part of the effort to understand the flow and transport characteristics downgradient from the proposed high-level radioactive waste geologic repository at Yucca Mountain, Nevada, single- and cross-hole tracer tests were conducted from December 2004 through October 2005 in boreholes at the Nye County 22 well complex. The results were analyzed for transport properties using both numerical and analytical solutions of the governing advection dispersion equation. Preliminary results indicate effective flow porosity values ranging from 1.0 x 10 -2 for an individual flow path to 2.0 x 10 -1 for composite flow paths, longitudinal dispersivity ranging from 0.3 to 3 m, and a transverse horizontal dispersivity of 0.03 m. Individual flow paths identified from the cross-hole testing indicate some solute diffusion into the stagnant portion of the alluvial aquifer

  11. Comparative study of conventional and ultrasonically-assisted bone drilling.

    Science.gov (United States)

    Alam, K; Ahmed, Naseer; Silberschmidt, V V

    2014-01-01

    Bone drilling is a well-known surgical procedure in orthopaedics and dentistry for fracture treatment and reconstruction. Advanced understanding of the mechanics of the drill-bone interaction is necessary to overcome challenges associated with the process and related postoperative complications. The aim of this study was to explore the benefits of a novel drilling technique, ultrasonically-assisted drilling (UAD), and its possible utilization in orthopaedic surgeries. The study was performed by conducting experiments to understand the basic mechanics of the drilling process using high speed filming of the drilling zone followed by measurements to quantify thrust force, surface roughness and cracking of the bone near the immediate vicinity of the hole with and without ultrasonic assistance. Compared to the spiral chips produced during conventional drilling (CD), UAD was found to break the chips in small pieces which facilitated their fast evacuation from the cutting region. In UAD, lower drilling force and better surface roughness was measured in drilling in the radial and longitudinal axis of the bone. UAD produced crack-free holes which will enhance postoperative performance of fixative devices anchoring the bone. UAD may be used as a possible substitute for CD in orthopaedic clinics.

  12. Thermal numerical assessment of jawbone drilling factor during implantology

    Directory of Open Access Journals (Sweden)

    Adel Pirjamali Neisiani

    2016-03-01

    Full Text Available Background and Aims: Optimization drilling parameters in order to temperature decrease during creation of hole in the bone is an interested issue. The aim of this study was to achieve optimum values of drilling parameters based on the creation of minimum temperature during jawbone drilling. Materials and Methods: In this study two models of mandible and maxilla was created and teeth 2, 5 and 8 from maxilla and teeth 25, 28 and 31 from mandible were removed. The drilling operation was performed under different conditions on jawbone models using finite element analysis and the maximum temperatures were measured in adjacent of holes. Results: Drill bit head angle of 70 degrees was created the lowest maximum temperature during drilling operation. The lowest maximum temperatures were observed in the drill bit rotational speed, drill bit feed rate and the force exerted on the drill bit equal to 200 rpm, 120 mm/min and 60 N, respectively. The use of irrigation can decrease the maximum bone temperature about 7ºC. The maximum temperature differences in various regions of mandible and maxilla were approximately about 1ºC. Conclusion: Sharpness of drill bit head angle, reduction of drill bit rotational speed, increasing drill bit feed rate and exerted force on drill bit and also the use of irrigation played effective roles in temperature decrease during jawbone drilling. Drilling site did not have important effect on the temperature changes during jawbone drilling.

  13. Observation of unusual irreversible/reversible effects in a macroscopic cylindrical hole drilled in superconducting Bi-Sr-Ca-Cu-O

    International Nuclear Information System (INIS)

    Yetis, H.; Kilic, A.; Kilic, K.; Altinkok, A.; Olutas, M.

    2008-01-01

    Current-voltage (I-V) measurements were carried out for different current sweep rates (dI/dt) of transport current at zero magnetic field (H = 0) and H ≠ 0 in a polycrystalline sample of Bi 1.7 Pb 0.3 Sr 2 Ca 2 Cu 3 O x (BSCCO) with a macroscopic cylindrical hole (CH) drilled. Similar measurements were also performed in the same BSCCO sample without CH for a comparison before drilling CH. For the same values of H, T, and dI/dt taken for both samples, it was observed that hysteresis effects appear in I-V curves upon cycling of transport current in upward and downward directions which contain the increasing and decreasing current values, respectively. However these effects which are seen in I-V curves of BSCCO sample with CH is more prominent than that of the BSCCO sample without CH. Further, the irreversibility effects in I-V curves of the BSCCO sample without CH disappears for H ≠ 0 exhibiting nearly a linear behaviour, whereas the hysteretic behaviour in I-V curves of the BSCCO sample with CH is still observed. This interesting behaviour could be evaluated that macroscopic cylindrical hole improves pinning properties of sample acting as a macroscopic flux pinning center for flux lines

  14. Application of Numerical Simulation for the Analysis of the Processes of Rotary Ultrasonic Drilling

    Directory of Open Access Journals (Sweden)

    Naď Milan

    2016-12-01

    Full Text Available Rotary ultrasonic machining (RUM is a hybrid process that combines diamond grinding with ultrasonic machining. It is most suitable to machine hard brittle materials such as ceramics and composites. Due to its excellent machining performance, RUM is very often applied for drilling of hard machinable materials. In the final phase of drilling, the edge deterioration of the drilled hole can occur, which results in a phenomenon called edge chipping. During hole drilling, a change in the thickness of the bottom of the drilled hole occurs. Consequently, the bottom of the hole as a plate structure is exposed to the transfer through the resonance state. This resonance state can be considered as one of the important aspects leading to edge chipping. Effects of changes in the bottom thickness and as well as the fillet radius between the wall and bottom of the borehole on the stress-strain states during RUM are analyzed.

  15. Geochemical and Mineralogical Profiles Across the Listvenite- Metamorphic Transition in the Basal Megathrust of the Oman Ophiolite: First Results from Drilling at Oman Drilling Project Hole BT1B

    Science.gov (United States)

    Godard, M.; Bennett, E.; Carter, E.; Kourim, F.; Lafay, R.; Noël, J.; Kelemen, P. B.; Michibayashi, K.; Harris, M.

    2017-12-01

    The transition from the base of the Oman ophiolite to the underlying metamorphic sole was drilled at Hole BT1B (Sumail Massif) during Phase 1 of Oman Drilling Project (Winter 2016-2017). 74 samples were collected from the 300m of recovered cores for whole rock geochemical and XRD analyses. 55 listvenites, ophicarbonates and serpentinites, and 19 schists and greenstones were analyzed for major and minor elements (XRF) and for CO2 and S concentrations (CHNS) aboard DV Chikyu (ChikyuOman, Summer 2017). Analyses for trace elements (ICP-MS) at the University of Montpellier are in progress. The composition of listvenites, ophicalcites and serpentinites recovered at Hole BT1B record extensive interactions between CO2-rich fluids and the serpentinized peridotites. These reactions involved addition of SiO2 and formation of carbonates at the expense of the serpentinized peridotite protolith. All samples recovered from the mantle section are enriched in fluid mobile and incompatible trace elements compared to the mean composition of the Oman mantle. These enrichments are up to 103 times the Oman mantle for Rb and Ba. They mimic the pattern of the samples from the metamorphic sole. This suggests that the composition of the listvenites in these elements is controlled by that of contaminating fluids that may have originated in the same lithologies as those drilled at the base of Hole BT1B. Listvenites, ophicalcites and serpentinites also show notable downhole chemical variations, with listvenites showing marked variations in Al2O3 and TiO2. Occurrence of lherzolites and cpx-harzburgites has been reported at the base of the Oman dominantly harzburgitic mantle section. The observed variations in the listvenites (Al2O3 and TiO2) could be related to the composition of their protolith, the deepest having more fertile compositions. Alternatively, the observed downhole changes in the composition of listvenites may relate to the progressive equilibration of the reacting ultramafic

  16. New weld coating process for directional horizontal drilling operations; Neues Schweissnaht-Beschichtungsverfahren fuer Horizontalbohrungen

    Energy Technology Data Exchange (ETDEWEB)

    Quast, M. [Denso GmbH, Leverkusen (Germany)

    2005-07-01

    Corrosion protective coatings of steel pipes laid by horizontal directional drilling are particularly stressed. Thermosetting compounds based on polyurethane or expoxides have proven their performance for the protection of welded joints of such pipes. The application of thermosetting joint coatings can currently be carried out in a lamination process, resulting in glass reinforced plastics coatings, or by spatula in case of polyurethane based materials. Both application procedures require a certain period of time and come along with drawbacks, which are typical for the application of reactive resins. This report describes a new procedure for the coating of welded joint areas of steel pipes with polyurethane reactive resins. By use of a special casing system the complications of applying the coating material by spatula are avoided. Consequently one can take complete advantage of using polyurethane coatings for HDD laid pipes without suffering from typical handling drawbacks. (orig.)

  17. Modification of the trapped field in bulk high-temperature superconductors as a result of the drilling of a pattern of artificial columnar holes

    International Nuclear Information System (INIS)

    Lousberg, Gregory P; Vanderbemden, Ph; Vanderheyden, B; Fagnard, J-F; Ausloos, M

    2010-01-01

    The trapped magnetic field is examined in bulk high-temperature superconductors that are artificially drilled along their c-axis. The influence of the hole pattern on the magnetization is studied and compared by means of numerical models and Hall probe mapping techniques. To this aim, we consider two bulk YBCO samples with a rectangular cross-section that are drilled each by six holes arranged either on a rectangular lattice (sample I) or on a centered rectangular lattice (sample II). For the numerical analysis, three different models are considered for calculating the trapped flux: (i), a two-dimensional (2D) Bean model neglecting demagnetizing effects and flux creep, (ii), a 2D finite-element model neglecting demagnetizing effects but incorporating magnetic relaxation in the form of an E - J power law, and, (iii), a 3D finite element analysis that takes into account both the finite height of the sample and flux creep effects. For the experimental analysis, the trapped magnetic flux density is measured above the sample surface by Hall probe mapping performed before and after the drilling process. The maximum trapped flux density in the drilled samples is found to be smaller than that in the plain samples. The smallest magnetization drop is found for sample II, with the centered rectangular lattice. This result is confirmed by the numerical models. In each sample, the relative drops that are calculated independently with the three different models are in good agreement. As observed experimentally, the magnetization drop calculated in the sample II is the smallest one and its relative value is comparable to the measured one. By contrast, the measured magnetization drop in sample (1) is much larger than that predicted by the simulations, most likely because of a change of the microstructure during the drilling process.

  18. Humvee Armor Plate Drilling

    National Research Council Canada - National Science Library

    2004-01-01

    When drilling holes in hard steel plate used in up-armor kits for Humvee light trucks, the Anniston Army Depot, Anniston, Alabama, requested the assistance of the National Center for Defense Manufacturing and Machining (NCDMM...

  19. A flexible method for residual stress measurement of spray coated layers by laser made hole drilling and SLM based beam steering

    Science.gov (United States)

    Osten, W.; Pedrini, G.; Weidmann, P.; Gadow, R.

    2015-08-01

    A minimum invasive but high resolution method for residual stress analysis of ceramic coatings made by thermal spraycoating using a pulsed laser for flexible hole drilling is described. The residual stresses are retrieved by applying the measured surface data for a model-based reconstruction procedure. While the 3D deformations and the profile of the machined area are measured with digital holography, the residual stresses are calculated by FE analysis. To improve the sensitivity of the method, a SLM is applied to control the distribution and the shape of the holes. The paper presents the complete measurement and reconstruction procedure and discusses the advantages and challenges of the new technology.

  20. NNWSI [Nevada Nuclear Waste Storage Investigations] hole histories

    International Nuclear Information System (INIS)

    1986-11-01

    This report is a compilation of data from twelve boreholes drilled in Area 25 under the guidance of the Sandia National Laboratory. They were drilled to provide samples and alluvial thickness determinations for the repository surface facilities, especially with respect to foundation conditions. Data presented in the hole histories include all locations, daily activities and review of hole conditions

  1. Measurement of heat treatment induced residual stresses by using ESPI combined with hole-drilling method

    Directory of Open Access Journals (Sweden)

    Jie Cheng

    2010-08-01

    Full Text Available In this study, residual stresses in heat treated specimen were measured by using ESPI (Electronic Speckle-Pattern Interferometry combined with the hole-drilling method. The specimen, made of SUS 304 austenitic stainless steel, was quenched and water cooled to room temperature. Numerical simulation using a hybrid FDM/FEM package was also carried out to simulate the heat treatment process. As a result, the thermal stress fields were obtained from both the experiment and the numerical simulation. By comparision of stress fields, results from the experimental method and numerical simulation well agreed to each other, therefore, it is proved that the presented experimental method is applicable and reliable for heat treatment induced residual stress measurement.

  2. Offset drilling obligations

    International Nuclear Information System (INIS)

    Boyd, K.D.; Kalmakoff, J.J.

    1998-01-01

    A review of the 'offset well' clause found in freehold and Crown natural gas and petroleum leases was presented. The objective was to provide lessors and lessees with a clear understanding of the rights and obligations associated with offset wells. It was noted that offset well obligations vary according to the form of lease used, the type of offsetting well, the regulatory regime and the geophysical characteristics of the producing formation. Some suggestions were made as to how current versions of the offset well clause can be amended to overcome some of the problems encountered in applying the clause to an offset horizontal well that has been drilled on adjoining lands. Failure to resolve the new issues presented by horizontal drilling technology in terms of documentation, which records respective rights and obligations on the basis of generally accepted principles, will result in large numbers of conflicts and unnecessary litigation. 144 refs., 1 fig

  3. Reaction of Topopah Spring tuff with J-13 water at 1500C: samples from drill cores USW G-1, USW GU-3, USW G-4, and UE-25h No. 1

    International Nuclear Information System (INIS)

    Oversby, V.M.

    1985-01-01

    Samples of Topopah Spring tuff selected from vertical drill holes USW G-1, GU-3, and G-4, and from the horizontal air-drilled hole at Fran Ridge were reacted with J-13 water at 150 0 C. The primary purpose of these experiments was to compare the resulting solution chemistries to estimate the degree of homogeneity that might be expected in thermally affected ground water in a potential nuclear waste repository at Yucca Mountain. The second purpose was to relate data obtained from welded devitrified Topopah Spring tuff collected from the potential repository depth to that previously obtained using outcrop samples. The results show very similar aqueous phase chemistries for all samples after reaction for times up to 70 days. The largest difference in final solution concentrations was for silica in one of the samples from Fran Ridge. All vertical drill core samples gave results for silica that were in agreement to within +-6 ppM and indicated solubility controlled by cristobalite. The results for reaction at 150 0 C are in agreement with those obtained in previous experiments using surface outcrop samples from Fran Ridge. The major difference between the drill core results and the outcrop samples is found in the data for room-temperature rinse solutions. The outcrop samples show relatively large amounts of soluble salts that can be easily removed at room temperature. The data for room-temperature rinsing of drill core samples show no significant quantities of readily soluble salts. This result is particularly significant for the samples from the air-drilled hole at Fran Ridge, since drilling fluid that might have removed soluble salts was not used in the portion of the hole from which the samples were obtained. This result strongly suggests that the presence of soluble salts is a surface evaporation phenomenon, and that such materials are unlikely to be present at the depth of the repository

  4. Réduction du nombre de puits par l'utilisation de forages horizontaux Reducing the Number of Wells by Using Horizontal Drilling

    Directory of Open Access Journals (Sweden)

    Giger F.

    2006-11-01

    Full Text Available L'un des intérêts du forage horizontal est le gain de productivité sur chaque puits. L'objet de cet article est de proposer des éléments d'analyse, comme la productivité surfacique, destinés à aider l'instance responsable du développement d'un champ confrontée au choix économique entre un schéma classique par puits verticaux et un autre schéma intégrant des puits d'un autre type, et notamment des drains horizontaux. Des méthodes de résolution approchées d'emploi simple sont proposées pour évaluer le nombre de puits verticaux que peut remplacer un drain ho-rizontal. One of the advantages of horizontal drilling is the increase in productivity of each well. The aim of this article is to propose bases for making an analysis, such as areal productivity, so as to help the decision-maker responsible for the development of a field when confronted with an economic choice between a conventional system using vertical wells and an alternative system including other types of wells, and in particular horizontal wells. Simple and approximate solutions are proposed for evaluating the number of vertical wells that can be replaced by a horizontal wells.

  5. The LITA Drill and Sample Delivery System

    Science.gov (United States)

    Paulsen, G.; Yoon, S.; Zacny, K.; Wettergreeng, D.; Cabrol, N. A.

    2013-12-01

    The Life in the Atacama (LITA) project has a goal of demonstrating autonomous roving, sample acquisition, delivery and analysis operations in Atacama, Chile. To enable the sample handling requirement, Honeybee Robotics developed a rover-deployed, rotary-percussive, autonomous drill, called the LITA Drill, capable of penetrating to ~80 cm in various formations, capturing and delivering subsurface samples to a 20 cup carousel. The carousel has a built-in capability to press the samples within each cup, and position target cups underneath instruments for analysis. The drill and sample delivery system had to have mass and power requirements consistent with a flight system. The drill weighs 12 kg and uses less than 100 watt of power to penetrate ~80 cm. The LITA Drill auger has been designed with two distinct stages. The lower part has deep and gently sloping flutes for retaining powdered sample, while the upper section has shallow and steep flutes for preventing borehole collapse and for efficient movement of cuttings and fall back material out of the hole. The drill uses the so called 'bite-sampling' approach that is samples are taken in short, 5-10 cm bites. To take the first bite, the drill is lowered onto the ground and upon drilling of the first bite it is then retracted into an auger tube. The auger with the auger tube are then lifted off the ground and positioned next to the carousel. To deposit the sample, the auger is rotated and retracted above the auger tube. The cuttings retained on the flutes are either gravity fed or are brushed off by a passive side brush into the cup. After the sample from the first bite has been deposited, the drill is lowered back into the same hole to take the next bite. This process is repeated until a target depth is reached. The bite sampling is analogous to peck drilling in the machining process where a bit is periodically retracted to clear chips. If there is some fall back into the hole once the auger has cleared the hole, this

  6. Improving steamflood effectiveness by horizontal producers

    Energy Technology Data Exchange (ETDEWEB)

    Leonhardt, B. [Wintershall AG, Barnstorf (Germany)

    2001-12-01

    The Emlichheim oilfield is located in North-West-Germany on the Dutch-German border being the Southern downdip part of the Schoonebeek anticline. The field was discovered in 1943 and came on production in 1944. Since production startup, Wintershall operates the field as owner of the concession (90% share of interest) in a joint venture with Mobil Erdgas-Erdoel GmbH (10%). For more than 50 years an average crude oil production of 150.000 t/year has been maintained. Starting with huff ''n'' puff and hot water flooding in the late 60's, the first steam flood project was implemented in 1981. Further steamflood projects started in 1989, 1992, 1993, 1994 and 1998 in different areas of the field. Until 1997, only vertical production wells were drilled in the field. Wellbore stability seemed to be a major problem for drilling horizontal wells in the unconsolidated sandstone reservoir at that time. In 1999 an innovative steamflood project was started with three newly drilled horizontal producers surrounding a vertical steam injector. First results are showing a significant improvement in the performance as compared to the earlier projects and offer new chances for further development of the field. Today, the field could no longer be operated without the steam projects as roughly 95% of the field production is coming from thermal EOR. This paper gives a brief overview of the field and its production history, the planning and realization of a current steamflood project using horizontal well technology as well as its performance compared to the earlier projects. It also describes the experience of drilling horizontal wells in the unconsolidated sandstone. A brief outlook to the future field development is given. (orig.)

  7. Development of the Breitbrunn/Eggstaett natural gas deposit: Drilling of the 8 1/2 inch horizontal boreholes with drill-in fluid; Ausbau des Erdgasspeichers Breitbrunn/Eggstaett, hier: Bohren der 8 1/2{sup ''}-Horizontalstrecken mit Drill-in-Fluid

    Energy Technology Data Exchange (ETDEWEB)

    Neufeld, A.; Jakschies, R. [RWE-DEA Aktiengesellschaft fuer Mineraloel und Chemie, Hamburg (Germany); Gankin, V. [Baroid Drilling Fluids GmbH, Celle (Germany)

    2001-07-01

    During the second stage of development of the project, six horizontal boreholes of 584-960 m were drilled at a depth of about 2000 m using the drill-in fluid technique. Details are presented. It was found that extremely high differential pressures will pose no problem provided that the drilling technology and flushing system are well matched. [German] Waehrend der 2. Baustufe des Projektes Erdgasspeicher Breitbrunn/Eggstaett sind in Teufe von ca. 2000 m sechs Bohrungen mit Horizontalstrecken von 584-960 m in den bis ca. 3 MPa (30 bar) druckabgesenkten Speichergesteinen C und D abgeteuft worden. Die Gesamtabweichung vom Ansatzpunkt auf der Sammellokation betraegt bis zu 2 518 m. Die Horizontalstrecken sind mit Hilfe eines auf die Formation abgestimmten fluessigen Spuelungssystems, dem sogenannten Drill-in-Fluid, gebohrt. Hauptaugenmerk galt bei dieser Spuelung dem Aufbau eines extrem duennen, impermeablem Filterkuchens mit niedrigem Reibungsfaktor. Die im Bereich der 9 5/8{sup ''}-Rohrtour in den Bohrstrang integrierten Torque-Reducer und dem Spuelungssystem zugefuehrtes Schmlermittel trugen zu einer erheblichen Reduzierung der Reibkraefte bei. Durch Einbau von Non-Hanging Anti-Sticking-Stabilisatoren in den Bohrstrang ist die Gefahr des Festwerdens zusaetzlich minimiert. Der Einsatz von LWD Geosteering Equipment und begleitende mikropalaeontologische Untersuchungen ermoeglichten eine optimale Orientierung der abzuteufenden Strecken. Die Erfahrungen von insgesamt 6 Breitbrunn-Bohrungen belegen, dass extrem hohe Differenzdruecke kein Problem fuer das erfolgreiche Abteufen einer Bohrung sein muessen, wenn Bohrtechnik und Spuelungssystem sorgfaeltig aufeinander abgestimmt werden. (orig.)

  8. Tesco's Bob Tessari: launching a drilling revolution

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-07-01

    The 'Casing Drilling' technology, patented by Tesco, which allows operators to simultaneously drill, case and evaluate oil and gas wells, is described. The system is claimed to substantially reduce the amount of lost circulation, loss of well control and bore hole instability problems that have been documented to account for about 25 per cent of total rig time on a well, and at least $4 billion (or 10 per cent of the $40 billion annual global drilling tab) spent on 'unscheduled events' associated with tripping drill pipe. With the Casing Drilling process, wells are drilled using standard oilfield casing instead of drill pipe. The host of downhole problems associated with tripping in and out of the hole are avoided, as the casing pipe is never removed. Instead, drill bits and other downhole tools are tripped through the casing with wireline at a rate of about 500 ft per minute, drastically reducing tripping time. Tesco also developed the portable top drive, the manufacture and rental of which constitutes a large part of the company's business, besides helping technologically to make Casing Drilling possible. Much of the company's success is attributed to the tenacity and zest for innovative approaches of the company's CEO, Bob Tessari, who is largely responsible for the company finding itself at the centre of a drilling technology revolution.

  9. Tethyan Anhydrite Preserved in the Lower Ocean Crust of the Samail Ophiolite? Evidence from Oman Drilling Project Holes GT1A and 2A

    Science.gov (United States)

    Teagle, D. A. H.; Harris, M.; Crispini, L.; Deans, J. R.; Cooper, M. J.; Kelemen, P. B.; Alt, J.; Banerjee, N.; Shanks, W. C., III

    2017-12-01

    Anhydrite is important in mid-ocean ridge hydrothermal systems because of the high concentrations of calcium and sulfate in modern seawater and anhydrite's retrograde solubility. Because anhydrite hosts many powerful tracers of fluid-rock interactions (87Sr/86Sr, δ18O, δ34S, trace elements, fluid inclusions) it is useful for tracing the chemical evolution of hydrothermal recharge fluids and estimating time-integrated fluid fluxes. Anhydrite can form from heated seawater (>100°C), through water-rock reaction, or by mixing of seawater and hydrothermal fluids. Although abundant in active hydrothermal mounds, and predicted to form from downwelling, warming fluids during convection, anhydrite is rare in drill core from seafloor lavas, sheeted dikes and upper gabbros, with only minor amounts in ODP Holes 504B and 1256D. Because anhydrite can dissolve during weathering, its occurrence in ophiolites is unexpected. Instead, gypsum is present in Macquarie Island lavas and Miocene gypsum fills cavities within the Cretaceous Troodos ore deposits. Thus, the occurrence of numerous anhydrite veins in cores from the gabbroic lower crust of the Samail ophiolite in Oman was unanticipated. To our knowledge, anhydrite in Oman gabbros has not been previously reported. Oman Drilling Project Holes GT1A and GT2A were drilled into the Wadi Gideah section of the Wadi Tayin massif. Both recovered 400 m of continuous core from sections of layered gabbros (GT1) and the foliated-layered gabbro transition (GT2). Anhydrite is present throughout both holes, some in vein networks but more commonly as isolated 1-110 mm veins (>60 mm ave). Anhydrite is mostly the sole vein filling but can occur with greenschist minerals such as epidote, quartz, chlorite and prehnite. Anhydrite commonly exhibits prismatic and bladed textures but can also be capriciously microcrystalline. Though definitive cross cutting relationships are elusive, anhydrite veins cut across some greenschist veins. Anhydrite is

  10. Observation of unusual irreversible/reversible effects in a macroscopic cylindrical hole drilled in superconducting Bi-Sr-Ca-Cu-O

    Energy Technology Data Exchange (ETDEWEB)

    Yetis, H. [Department of Physics, Turgut Gulez Research Laboratory, Abant Izzet Baysal University, 14280 Bolu (Turkey)], E-mail: yetis_h@ibu.edu.tr; Kilic, A.; Kilic, K.; Altinkok, A.; Olutas, M. [Department of Physics, Turgut Gulez Research Laboratory, Abant Izzet Baysal University, 14280 Bolu (Turkey)

    2008-09-15

    Current-voltage (I-V) measurements were carried out for different current sweep rates (dI/dt) of transport current at zero magnetic field (H = 0) and H {ne} 0 in a polycrystalline sample of Bi{sub 1.7}Pb{sub 0.3}Sr{sub 2}Ca{sub 2}Cu{sub 3}O{sub x} (BSCCO) with a macroscopic cylindrical hole (CH) drilled. Similar measurements were also performed in the same BSCCO sample without CH for a comparison before drilling CH. For the same values of H, T, and dI/dt taken for both samples, it was observed that hysteresis effects appear in I-V curves upon cycling of transport current in upward and downward directions which contain the increasing and decreasing current values, respectively. However these effects which are seen in I-V curves of BSCCO sample with CH is more prominent than that of the BSCCO sample without CH. Further, the irreversibility effects in I-V curves of the BSCCO sample without CH disappears for H {ne} 0 exhibiting nearly a linear behaviour, whereas the hysteretic behaviour in I-V curves of the BSCCO sample with CH is still observed. This interesting behaviour could be evaluated that macroscopic cylindrical hole improves pinning properties of sample acting as a macroscopic flux pinning center for flux lines.

  11. Analysis of materials modifications caused by UV laser micro drilling of via holes in AlGaN/GaN transistors on SiC

    Energy Technology Data Exchange (ETDEWEB)

    Wernicke, Tim [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany)]. E-mail: tim.wernicke@fbh-berlin.de; Krueger, Olaf [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany); Herms, Martin [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany); Wuerfl, Joachim [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany); Kirmse, Holm [Humboldt-Universitaet zu Berlin, Institut fuer Physik, AG Kristallographie, Newtonstr. 15, 12489 Berlin (Germany); Neumann, Wolfgang [Humboldt-Universitaet zu Berlin, Institut fuer Physik, AG Kristallographie, Newtonstr. 15, 12489 Berlin (Germany); Behm, Thomas [Technische Universitaet Bergakademie Freiberg, Institut fuer Theoretische Physik, Bernhard-von-Cotta-Str. 4, 09596 Freiberg (Germany); Irmer, Gert [Technische Universitaet Bergakademie Freiberg, Institut fuer Theoretische Physik, Bernhard-von-Cotta-Str. 4, 09596 Freiberg (Germany); Traenkle, Guenther [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany)

    2007-07-31

    Pulsed UV laser drilling can be applied to fabricate vertical electrical interconnects (vias) for AlGaN/GaN high electron mobility transistor devices on single-crystalline silicon carbide (SiC) substrate. Through-wafer micro holes with a diameter of 50-100 {mu}m were formed in 400 {mu}m thick bulk 4H-SiC by a frequency-tripled solid-state laser (355 nm) with a pulse width of {<=}30 ns and a focal spot size of {approx}15 {mu}m. The impact of laser machining on the material system in the vicinity of micro holes was investigated by means of micro-Raman spectroscopy and transmission electron microscopy. After removing the loosely deposited debris by etching in buffered hydrofluoric acid, a layer of <4 {mu}m resolidified material remains at the side walls of the holes. The thickness of the resolidified layer depends on the vertical distance to the hole entry as observed by scanning electron microscopy. Micro-Raman spectra indicate a change of internal strain due to laser drilling and evidence the formation of nanocrystalline silicon (Si). Microstructure analysis of the vias' side walls using cross sectional TEM reveals altered degree of crystallinity in SiC. Layers of heavily disturbed SiC, and nanocrystalline Si are formed by laser irradiation. The layers are separated by 50-100 nm thick interface regions. No evidence of extended defects, micro cracking or crystal damage was found beneath the resolidified layer. The precision of UV laser micro ablation of SiC using nanosecond pulses is not limited by laser-induced extended crystal defects.

  12. Electric motor for laser-mechanical drilling

    Science.gov (United States)

    Grubb, Daryl L.; Faircloth, Brian O.; Zediker, Mark S.

    2017-10-10

    A high power laser drilling system utilizing an electric motor laser bottom hole assembly. A high power laser beam travels within the electric motor for performing a laser operation. A system includes a down hole electrical motor having a hollow rotor for conveying a high power laser beam having a wavelength less than 1060 nm through the electrical motor.

  13. Detailed petrographic descriptions and microprobe data for tertiary silicic volcanic rocks in drill hole USW G-1, Yucca Mountain, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    Caporuscio, F.A.; Warren, R.G.; Broxton, D.E.

    1985-12-01

    This report contains detailed petrographic descriptions of 74 thin sections from drill hole USW G-1 at Yucca Mountain, Nevada. These descriptions are keyed to the distinctions between devitrified, vitrophyre, vitric, and zeolitized intervals below the Topopah Spring Member repository horizon. The petrographic features of the zeolitized intervals down through the Crater Flat tuff, as well as the sorption properties determined from these intervals, suggest that these zeolite occurrences may each have comparable sorptive capability.

  14. Determination of three-dimensional stress orientations in the Wenchuan earthquake Fault Scientific Drilling (WFSD) hole-1: A preliminary result by anelastic strain recovery measurements of core samples

    Science.gov (United States)

    Cui, J.; Lin, W.; Wang, L.; Tang, Z.; Sun, D.; Gao, L.; Wang, W.

    2010-12-01

    A great and destructive earthquake (Ms 8.0; Mw 7.9), Wunchuan earthquake struck on the Longmen Shan foreland trust zone in Sichuan province, China on 12 May 2008 (Xu et al., 2008; Episodes, Vol.31, pp.291-301). As a rapid response scientific drilling project, Wenchuan earthquake Fault Scientific Drilling (WFSD) started on 6 November 2008 shorter than a half of year from the date of earthquake main shock. The first pilot borehole (hole-1) has been drilled to the target depth (measured depth 1201 m MD, vertical depth 1179 m) at Hongkou, Dujianyan, Sichuan and passed through the main fault of the earthquake around 589 m MD. We are trying to determine three dimensional in-situ stress states in the WFSD boreholes by a core-based method, anelastic strain recovery (ASR) method (Lin et al., 2006; Tectonophysics, Vol4.26, pp.221-238). This method has been applied in several scientific drilling projects (TCDP: Lin et al., 2007; TAO, Vol.18, pp.379-393; NanTtoSEIZE: Byrne et al., 2009; GRL, Vol.36, L23310). These applications confirm the validity of using the ASR technique in determining in situ stresses by using drilled cores. We collected total 15 core samples in a depth range from 340 m MD to 1180 m MD, approximately for ASR measurements. Anelastic normal strains, measured every ten minutes in nine directions, including six independent directions, were used to calculate the anelastic strain tensors. The data of the ASR tests conducted at hole-1 is still undergoing analysis. As a tentative perspective, more than 10 core samples showed coherent strain recovery over one - two weeks. However, 2 or 3 core samples cannot be re-orientated to the global system. It means that we cannot rink the stress orientation determined by the core samples to geological structure. Unfortunately, a few core samples showed irregular strain recovery and were not analyzed further. The preliminary results of ASR tests at hole-1 show the stress orientations and stress regime changes a lot with the

  15. Feasibility of Optimizing Recovery and Reserves from a Mature and Geological Complex Multiple Turbidite Offshore Calif. Reservoir through the Drilling and Completion of a Trilateral Horizontal Well, Class III

    Energy Technology Data Exchange (ETDEWEB)

    Pacific Operators Offshore, Inc.

    2001-04-04

    The intent of this project was to increase production and extend the economic life of this mature field through the application of advanced reservoir characterization and drilling technology, demonstrating the efficacy of these technologies to other small operators of aging fields. Two study periods were proposed; the first to include data assimilation and reservoir characterization and the second to drill the demonstration well. The initial study period showed that a single tri-lateral well would not be economically efficient in redevelopment of Carpinteria's multiple deep water turbidite sand reservoirs, and the study was amended to include the drilling of a series of horizontal redrills from existing surplus well bores on Pacific Operators' Platform Hogan.

  16. Neogene and Quaternary geology of a stratigraphic test hole on Horn Island, Mississippi Sound

    Science.gov (United States)

    Gohn, Gregory S.; Brewster-Wingard, G. Lynn; Cronin, Thomas M.; Edwards, Lucy E.; Gibson, Thomas G.; Rubin, Meyer; Willard, Debra A.

    1996-01-01

    During April and May, 1991, the U.S. Geological Survey (USGS) drilled a 510-ft-deep, continuously cored, stratigraphic test hole on Horn Island, Mississippi Sound, as part of a field study of the Neogene and Quaternary geology of the Mississippi coastal area. The USGS drilled two new holes at the Horn Island site. The first hole was continuously cored to a depth of 510 ft; coring stopped at this depth due to mechanical problems. To facilitate geophysical logging, an unsampled second hole was drilled to a depth of 519 ft at the same location.

  17. Horizontal Devonian shale well, Columbia Natural Resources, Inc. 's, Pocohontas Development Corp. Well 21747, Martin County, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    Koziar, G.; Ahmad, M.M.; Friend, L.L.; Friend, M.L.; Rothman, E.M.; Stollar, R.L. (Columbia Gas System Service Corp., Columbus, OH (United States))

    1991-05-01

    Columbia Gas and the United States Department of Energy (DOE) have successfully completed field work on a horizontally drilled Devonian shale well located in Martin County, Kentucky. The objective of this cofunded project is to assess the effectiveness and economic feasibility of applying horizontal drilling and hydraulically fracturing stimulation techniques to enhance the extraction of natural gas from the Devonian shale. The well is comprised of three segments: a conventional vertical section, an angle build section and a horizontal section. The well reached a measured depth (MD) of 6263 feet, 3810 feet true vertical depth (TVD), with a horizontal displacement of 2812 feet achieved in the desired direction of N10{degrees}W. Both air and foam were used as drilling fluids. The vertical, lateral and tangent sections were drilled using conventional rotary drilling methods. Downhole motors were used to build angle. A total combined final open flow of 3.1 MMcfd was measured from all zones. Total well expenditures are approximately $1,460,000. Of this amount, $700,000 is directly related to the research and learning curve experience aspects. It is projected that the same horizontal well could be drilled with existing technology for $700,000. If advanced can be made in MWD systems for air drilling environments, wells of this type could be drilled routinely for $500,000. It appears that application of horizontal drilling will result in at least acceleration of gas production and possibly the addition of recoverable reserves from the Devonian shale. Production data, necessary to validate this statement, are also required to determine the economics. As we gain experience and technology advances, cost reductions will occur; this will result in economic improvement.

  18. Casing drilling - first experience in Brazil; Casing drilling - primeira experiencia no Brasil

    Energy Technology Data Exchange (ETDEWEB)

    Placido, Joao Carlos Ribeiro; Medeiros, Fernando; Lucena, Humberto; Medeiros, Joao Carlos Martins de; Costa, Vicente Abel Soares Rosa da; Silva, Paulo Roberto Correa da [PETROBRAS, Rio de Janeiro, RJ (Brazil); Alves, Renato J.M. [Tesco, London (United Kingdom)

    2004-07-01

    This paper describes the 'Casing Drilling' technology and its first experience in Brazil. This new process of casing while drilling was first developed to reduce costs. This system integrates the drilling process and casing running in one operation, promoting a more efficient well construction system, reducing trip time and costs of drill pipes and their transportation. Besides, this methodology intends to eliminate hole problems related to trouble zones with abnormal pressure with loss circulation, to overcome zones with wellbore instabilities, and to facilitate well control. Two companies have been identified using this technology: Tesco and Weatherford. However, there are differences between the techniques used by these companies, which are described in this paper. In the first experience in Brazil, it was decided to field test the technology developed by Tesco. This paper describes the preparation, the operation and the results of this first test. (author)

  19. Problems in the wellbore integrity of a shale gas horizontal well and corresponding countermeasures

    Directory of Open Access Journals (Sweden)

    Zhonglan Tian

    2015-12-01

    Full Text Available In the Changning–Weiyuan national shale gas demonstration area, SW Sichuan Basin, the wellbore integrity damage occurs in some shale gas wells and has direct effect on the gas production rate of single shale gas horizontal well. After statistics analysis was performed on the problems related with wellbore integrity, such as casing damage, casing running difficulty and cement sheath blow-by, the multi-factor coupling casing stress calculation and evaluation mode laws established. Then study was conducted on the influential mechanism of multi-factor coupling (temperature effect, casing bending and axial pressure on casing damage. The shale slip mechanism and its relationship with casing sheared formation were analyzed by using the Mohr–Coulomb criterion. Inversion analysis was performed on the main controlling factors of casing friction by using the developed casing hook load prediction and friction analysis software. And finally, based on the characteristics of shale gas horizontal wells, wellbore integrity control measures were proposed in terms of design and construction process, so as to improve the drilling quality (DQ. More specifically, shale gas well casing design calculation method and check standard were modified, well structure and full bore hole trajectory design were optimized, drilling quality was improved, cement properties were optimized and cement sealing integrity during fracturing process was checked. These research findings are significant in the design and management of future shale gas borehole integrity.

  20. Second half work to boost 1991 drilling in the U.S

    International Nuclear Information System (INIS)

    Petzet, G.A.

    1991-01-01

    This paper reports that U.S. well completions in 1991 will increase about 8% compared with 1990 if operators stick with present spending plans during the second half. Operators are expected to realize $76.4 billion in wellhead revenues this year, 10.7% less than the 1990 estimate. However, they are expected to invest a larger share of those revenues in drilling this year than they did in 1990. With less than half the year remaining, here is Oil and Gas Journal's updated look at 1991 U.S. drilling: The rotary rig count will average 1,050, up from last year's average of 1,010. Operators will drill about 31,654 oil wells, gas wells, and dry holes compared with an estimated 29,170 drilled in 1990. Exploratory drilling will decline to 5,711 wildcats. Total footage drilled will exceed 152 million ft of hole; average well depth is expected to be about 4,805 ft. Major oil companies drilled 2,602 wells in the U.S. during first half 1991 and plan to drill 2,569 the rest of this year. Meanwhile, drilling in western Canada will likely total 5,900 wells this year

  1. Key technology for treating slack coal blockage in CBM recovery: A case study from multi-lateral horizontal wells in the Qinshui Basin

    Directory of Open Access Journals (Sweden)

    Yong Yang

    2016-01-01

    Full Text Available Due to the nature of coal bed, slack coal production is inevitable in gas recovery sby water drainage. When coalbed methane (CBM wells are reentered after low energy exploitation and shut-in, the negative effect of slack coal production on productivity of CBM is irreversible. In this paper, the CBM occurrence characteristics and multi-lateral horizontal well trajectory in the Qinshui Basin, Shanxi Province, were analyzed. In the multi-lateral horizontal wells, the expected gas production rate could not be reached and the production rate after shut-in maintenance could not restore to the level before shut-in. The reason for these issues is that migration pathways in the reservoirs are blocked by slack coal deposits, while formation water and slack coal deposit accumulated at the troughs of horizontal sections enlarge the resistance for gas to flow into the bottom hole. Furthermore, three key technologies to deal with slack coal blockage were proposed. Firstly, CBM horizontal well trajectory should follow the principle of keeping the wellbores smooth and updip instead of being “wavy”, on the premise of guaranteeing CBM drilling rate. Secondly, the cavities of production wells, as an important part of multi-lateral horizontal wells, are capable of settling sand, and can be used for gas–liquid–solid separation. And thirdly, a tree-like horizontal well with its main hole set on stable seam top or floor, provides a stable well flushing passage for coal powder. This research provides a useful attempt in solving the problem of slack coal production in gas recovery by water drainage.

  2. Pulsed Nd:YAG laser beam drilling: A review

    Science.gov (United States)

    Gautam, Girish Dutt; Pandey, Arun Kumar

    2018-03-01

    Laser beam drilling (LBD) is one of non contact type unconventional machining process that are employed in machining of stiff and high-strength materials, high strength temperature resistance materials such as; metal alloys, ceramics, composites and superalloys. Most of these materials are difficult-to-machine by using conventional machining methods. Also, the complex and precise holes may not be obtained by using the conventional machining processes which may be obtained by using unconventional machining processes. The laser beam drilling in one of the most important unconventional machining process that may be used for the machining of these materials with satisfactorily. In this paper, the attention is focused on the experimental and theoretical investigations on the pulsed Nd:YAG laser drilling of different categories of materials such as ferrous materials, non-ferrous materials, superalloys, composites and Ceramics. Moreover, the review has been emphasized by the use of pulsed Nd:YAG laser drilling of different materials in order to enhance productivity of this process without adverse effects on the drilled holes quality characteristics. Finally, the review is concluded with the possible scope in the area of pulsed Nd:YAG laser drilling. This review work may be very useful to the subsequent researchers in order to give an insight in the area of pulsed Nd:YAG laser drilling of different materials and research gaps available in this area.

  3. Numerical Investigation of Influences of Drilling Arrangements on the Mechanical Behavior and Energy Evolution of Coal Models

    Directory of Open Access Journals (Sweden)

    Tong-bin Zhao

    2018-01-01

    Full Text Available Destress drilling method is one of the commonly used methods for mitigating rock bursts, especially in coal mining. To better understand the influences of drilling arrangements on the destress effect is beneficial for rock burst mitigation. This study first introduced the rock burst mitigation mechanism of the destress drilling method and then numerically investigated the influences of drilling arrangements on the mechanical properties of coal models through uniaxial compression tests. Based on the test results, the energy evolution (i.e., the energy dissipation and bursting energy indexes influenced by different drilling arrangements was analyzed. When the drilling diameter, the number of drilling holes in one row, or the number of drilling rows increases, the bearing capacity of specimens nonlinearly decreases, but the energy dissipation index increases. In addition, the drilling diameter or the number of drilling holes in one row affects the failure mode weakly, which is different from that of the number of drilling rows. Consequently, the bursting energy index decreases as increasing the drilling diameter or the number of drilling holes in one row, but as increasing the number of drilling rows, the variation law of bursting energy index is not obvious. At last, the influencing mechanism of drilling arrangement on the rock burst prevention mechanism of the destress drilling method was discussed and revealed.

  4. Engineering report on drilling in the western Prescott and Williams Quadrangles, Arizona

    International Nuclear Information System (INIS)

    McCaslin, J.L.

    1980-04-01

    This report presents engineering details, statistics, and individual borehole histories of the 18 holes drilled for this project. Charts showing daily drilling progress are included in Appendix A, and geophysical logs, on microfiche, are included. This project consisted of 18 drill holes ranging in depth from 1,341 ft (408.7m) to 5,491 ft (1,673.7m). A total of 63,520 feet (19,360.9m) was drilled during the project. The objective of the project was to obtain subsurface data that would permit a more accurate estimate to be made of the uranium potential in the Tertiary basins within the project area. This project began on June 22, 1979. All drilling was completed on October 30, 1979, and final site restoration continued through November and December

  5. Uranium Geologic Drilling Project, Sand Wash Basin, Moffat and Routt Counties, Colorado:

    International Nuclear Information System (INIS)

    1978-01-01

    This environmental assessment of drill holes in Moffat and Routt Counties, Colorado considered the current environment; potential impacts from site preparation, drilling operations, and site restoration; coordination among local, state and federal plans; and consideration of alternative actions for this uranium drilling project

  6. Review of casing while drilling technology

    Directory of Open Access Journals (Sweden)

    Pavković Bojan

    2016-01-01

    Full Text Available Conventional drilling methods have been plagued with huge operational and financial challenges, such as cost of purchasing, inspecting, handling, transporting the drill equipment and most importantly, tripping in-and-out of the drill string whenever the Bottom Hole Assembly (BHA needs a replacement, needs of wiper trip or when total depth is reached. The tripping in-and-out of the drill string not only contributes to Non Productive Time (NPT but also leads to well control difficulties including wellbore instability and lost circulation. All this has led Oil and Gas industry, as well as any other engineering industry, to seek for new ways and methods in order to reduce these problems. Thanks to the advances in technical solutions and constant improvements of conventional drilling methods, a new drilling method - casing while drilling has been developed. Casing Drilling encompasses the process of simultaneously drilling and casing a well, using the active casing and thus optimizes the production. This paper presents a review of casing while drilling method (CwD and its practical usage in drilling wells. The comparison of conventional drilling method and casing while drilling is also presented. The CwD method achieves significantly better results than conventional drilling method.

  7. Rotary Percussive Auto-Gopher for Deep Drilling and Sampling

    Science.gov (United States)

    Bar-Cohen, Yoseph; Badescu, Mircea; Sherrit, Stewart

    2009-01-01

    The term "rotary percussive auto-gopher" denotes a proposed addition to a family of apparatuses, based on ultrasonic/ sonic drill corers (USDCs), that have been described in numerous previous NASA Tech Briefs articles. These apparatuses have been designed, variously, for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. In the case of the rotary percussive autogopher, the emphasis would be on developing an apparatus capable of penetrating to, and acquiring samples at, depths that could otherwise be reached only by use of much longer, heavier, conventional drilling-and-sampling apparatuses. To recapitulate from the prior articles about USDCs: A USDC can be characterized as a lightweight, low-power jackhammer in which a piezoelectrically driven actuator generates ultrasonic vibrations and is coupled to a tool bit through a free mass. The bouncing of the free mass between the actuator horn and the drill bit converts the actuator ultrasonic vibrations into sonic hammering of the drill bit. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that the size of the axial force needed to make the tool bit advance into soil, rock, or another material of interest is much smaller than in ordinary rotary drilling, ordinary hammering, or ordinary steady pushing. The predecessor of the rotary percussive auto-gopher is an apparatus, now denoted an ultrasonic/sonic gopher and previously denoted an ultrasonic gopher, described in "Ultrasonic/ Sonic Mechanism for Drilling and Coring" (NPO-30291), NASA Tech Briefs Vol. 27, No. 9 (September 2003), page 65. The ultrasonic/sonic gopher is intended for use mainly in acquiring cores. The name of the apparatus reflects the fact that, like a

  8. L'intérêt du forage horizontal pour l'exploitation de gisements d'hydrocarbures Advantages of Horizontal Drilling for Production from Hydrocarbon Fields

    Directory of Open Access Journals (Sweden)

    Giger F.

    2006-11-01

    puits horizontaux manifestent une supériorité d'autant plus nette que le rapport de mobilité est défavorable, huile lourde balayée par de l'eau par exemple. Le phénomène nocif est en effet la percée des fronts, qui est d'autant plus précoce que l'écoulement est instable. La régularité du drainage entre puits horizontaux apporte une progression plus homogène des fronts, particulièrement avantageuse en début de production. Cependant, les gisements comportant toujours des hétérogénéités, on ne pourra bénéficier complètement de ces effets favorables que si l'on parvient à maîtriser les complétions sélectives en puits horizontal. Pour des raisons en partie semblables, les puits horizontaux possèdent des atouts pour la récupération thermique. Le positionnement précis d'une rampe d'injection à une profondeur définie dans le gisement devrait permettre d'y faire pénétrer facilement de la vapeur de façon à ce que la zone qu'elle envahit se développe régulièrement, tout en diminuant les pertes thermiques dans les épontes. Enfin, il faut ajouter que les puits horizontaux se sont révélés, grâce aux surprenantes performances des diagraphies et du carottage, de très riches outils de connaissance de l'évolution latérale des faciès et de la répartition des fluides dans le gisement. For fields with little vertical thickness, the productive length of a horizontal well is considerably greater than that of a vertical well. The productivity of a horizontal well increases with its length, although more slowly than this length because a logarithmic pressure-distance law comes into play. Analytical derivations as well as simulations on numerical models show that the increase in productivity may regularly attain a factor of 3 to 5. In fields having parallel vertical fractures, a horizontal well drilled perpendicularly to these fractures should cut across a great many of them and thus provide a much greater increase in productivity. In the case of

  9. Stratigraphy and structure of volcanic rocks in drill hole USW-G1, Yucca Mountain, Nye County, Nevada

    International Nuclear Information System (INIS)

    Spengler, R.W.; Byers, F.M. Jr.; Warner, J.B.

    1981-01-01

    Detailed subsurface studies in connection with the Nevada Nuclear Waste Storage Investigations program are being conducted to investigate the stratigraphic and structural features of volcanic rocks underlying Yucca Mountain, a volcanic highland situated along the western boundary of the Nevada Test Site in southern Nevada. As part of this continuing effort, drill hole USW-G1 was cored from 292 ft to a depth of 6000 ft from March to August 1980. The stratigraphic section is composed of thick sequences of ash-flow tuff and volcanic breccia interbedded with subordinate amounts of fine- to coarse-grained volcaniclastic rocks. All rocks are of Tertiary age and vary in composition from rhyolite to dacite. The 3005-ft level in the drill hole represents a significant demarcation between unaltered and altered volcanic rocks. For the most part, tuff units above 3005 ft appear devitrified and show little secondary alteration except within tuffaceous beds of Calico Hills, where the rock contains 60 to 80% zeolites. Below 3005 ft, most rocks show intermittent to pervasive alteration to clay minerals and zeolites. Examination of core for structural features revealed the presence of 61 shear fractures, 528 joints, and 4 conspicuous fault zones. Shear fractures mainly occurred in the Topopah Spring Member of the Paintbrush Tuff, flow breccia, and near fault zones. Nearly 88% of shear and joint surfaces show evidence of coatings. Approximately 40% of the fractures were categorized as completely healed. Rock quality characteristics as defined by the core index indicate that greater amounts of broken and lost core are commonly associated with (1) the densely welded zone of the Topopah Spring, (2) highly silicified zones, and (3) fault zones

  10. A bit faster : ReedHycalog focuses new drill bit technology on the needs of western Canadian drillers

    Energy Technology Data Exchange (ETDEWEB)

    Wells, P.

    2009-06-15

    ReedHycalog, a division of National Oilwell Varco Inc., is advancing its drill bit technology and is setting performance records in an effort to meet the needs of drillers in western Canada. This article described the company's new drill bit technology. Through its motor series polycrystalline diamond cutter (PDC) bits, ReedHycalog developed and commercialized several unique and proprietary drill bit features that reduced variations in torque. This lowered the risk of stick-slip while improving lateral stability, directional control and drilling efficiency. The design of the motor series bits was reviewed along with laboratory and field testing. Smooth torque was identified as one of the greatest challenges when drilling with a drill bit on a directional assembly. Test results revealed that there are 4 distinct characteristics for optimal steerable motor performance, such as smooth torque control components (TCC) that were specifically positioned in the cone of the bit to prevent cutter over engagement reducing in torque fluctuations for optimal tool face control; optimized cutter backrakes that provided high penetration rates in rotating mode, while TCCs were optimized to control torque when sliding; gauge inserts for lateral control that provided a low-friction bearing surface; and laterally exposed gauge cutters that cleaned up the hole in rotating mode, and a tapered upper section that reduced gauge pad interference while in sliding mode. The motor series bits performed extremely well in the vertical, build and horizontal intervals with multiple operators. 1 ref., 3 figs.

  11. Horizontal Devonian shale well, Columbia Natural Resources, Inc.`s, Pocohontas Development Corp. Well 21747, Martin County, Kentucky. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Koziar, G.; Ahmad, M.M.; Friend, L.L.; Friend, M.L.; Rothman, E.M.; Stollar, R.L. [Columbia Gas System Service Corp., Columbus, OH (United States)

    1991-05-01

    Columbia Gas and the United States Department of Energy (DOE) have successfully completed field work on a horizontally drilled Devonian shale well located in Martin County, Kentucky. The objective of this cofunded project is to assess the effectiveness and economic feasibility of applying horizontal drilling and hydraulically fracturing stimulation techniques to enhance the extraction of natural gas from the Devonian shale. The well is comprised of three segments: a conventional vertical section, an angle build section and a horizontal section. The well reached a measured depth (MD) of 6263 feet, 3810 feet true vertical depth (TVD), with a horizontal displacement of 2812 feet achieved in the desired direction of N10{degrees}W. Both air and foam were used as drilling fluids. The vertical, lateral and tangent sections were drilled using conventional rotary drilling methods. Downhole motors were used to build angle. A total combined final open flow of 3.1 MMcfd was measured from all zones. Total well expenditures are approximately $1,460,000. Of this amount, $700,000 is directly related to the research and learning curve experience aspects. It is projected that the same horizontal well could be drilled with existing technology for $700,000. If advanced can be made in MWD systems for air drilling environments, wells of this type could be drilled routinely for $500,000. It appears that application of horizontal drilling will result in at least acceleration of gas production and possibly the addition of recoverable reserves from the Devonian shale. Production data, necessary to validate this statement, are also required to determine the economics. As we gain experience and technology advances, cost reductions will occur; this will result in economic improvement.

  12. Multilateral wells drilling technology implementation in the Castilla Field - Colombia, to improve Guadalupe reservoirs drainage: Castilla 32, 33, and 34 ML wells cases study

    Energy Technology Data Exchange (ETDEWEB)

    Florez, Alberto; Mercado, Orlando; Rodriguez, Sandra; Rojas, Ricardo; Naranjo, Carlos A. [ECOPETROL, Bogota (Colombia); Velez, Jorge [Halliburton Latin-America, Santa Fe de Bogota (Colombia)

    2008-07-01

    National Colombian Petroleum Company - ECOPETROL, is in the process of evaluating different technologies to increase production and improve recovery factors in their mature oil and gas fields. As part of that process, a multidisciplinary team evaluated the feasibility of multilateral well technology implementation in some of their mature fields that are currently in the late-development phase. Castilla field, located in the eastern planes of Colombia, was selected as the first option for multilateral technology implementation based in reservoir features, type of oil, and field antecedents. This paper presents the process used to conceptualize the optimum multilateral well design for Castilla field, integrating all of the geological and engineering disciplines. Geology: geological model visualization, target zones definition, pay zones lateral continuity, petrophysical properties, and fluids distribution were evaluated to select the areas to drill with advanced architecture well design. Reservoir: basic reservoir performance simulation was performed to evaluate productivity with horizontal and multilateral wells, and the difference in final reserves recovery compared with current conventional directional wells. Water production and coning problems were identified as key factors to define the multilateral well implementation in this field. Drilling: trajectory design, multilateral junction depth definition and TAML level selection, casing point's definition, drilling time and AFE estimation were the technical aspects evaluated during the planning phase to determine if the technology would be feasible. A comparison with conventional pad design was conducted to validate economic value. Multilateral TAML level 4 system selection flow process is presented applying oil industry best practices. Completion: The optimum lateral completion and production assembly design were main concerns during the planning process. Slotted liners, screens, and open-hole completion

  13. Diamond-set drill bits: savings achieved at Cominak

    International Nuclear Information System (INIS)

    Artru, P.; Bibert, F.X.; Croisat, G.

    1988-01-01

    Rotary instead of percussion adoption of drilling in the underground Akouta mine (Niger) has been the cause of important savings in blasting and bolting operations. Other savings affect capital expenditures and indirect savings are coming from better working conditions. For blast holes drilling and bolting, spare parts expenditures are 2.4 times lower with rotary drilling. Drilling rods are cheaper and last longer with rotary drilling. A rotary equipped Jumbos fleet is cheaper to maintain and is 18% more available, due to less mechanical and other breakdowns. Total savings for the mine owner and operator Cominak reach more than a billion of CFA francs [fr

  14. Interactive Drilling Using Real-time LWD A Chevron Nigeria Ltd And Schlumberger Experience

    International Nuclear Information System (INIS)

    Parvez, B.; Ingham, S.; Raginal, O.; Osman, K.

    2002-01-01

    CNL's experience is that the most effective means of GeoSteering horizontal wells is to co-locate the GeoSteering and multi-disciplinary Asset teams in Central location and not at the well site. Real-Time Logging-While-Drilling and reliable data transmissions are both key to successful interactive drilling from a remote location. The accuracy and quality of LWD Real-Time measurements and their use for true geological and GeoSteering evaluation are presented in this paper.Customization of data frames and samples time to acquire a real-time log suite suitable for a specific geological problem will be discussed first then the effects of the drilling environments on sensor response, the relationship of specified sensor accuracy to logging speeds and data transmission rates. The paper then proceeds to the different sources of noise on real-time data and quality control procedures like filter mechanism, spectral analysis and recapturing of the LWD data on the rig.After a brief description of data transmission systems the paper will end with discussion on use of while drilling data for true geological and GeoSteering evaluation and implementation of some new evaluation concepts, decision trees and best practices.Examples will illustrate the customization of data frames. Effects of rate of penetration, tool rotation, sample time on real-time data. Real-time log interpretation like effects of approaching bed boundary, anisotropy and invasion and of hole enlargement

  15. UV laser drilling of SiC for semiconductor device fabrication

    Energy Technology Data Exchange (ETDEWEB)

    Krueger, Olaf; Schoene, Gerd; Wernicke, Tim; John, Wilfred; Wuerfl, Joachim; Traenkle, Guenther [Ferdinand-Braun-Institut fuer Hoechstfrequenztechnik, Gustav-Kirchhoff-Str. 4, 12489 Berlin (Germany)

    2007-04-15

    Pulsed UV laser processing is used to drill micro holes in silicon carbide (SiC) wafers supporting AlGaN/GaN transistor structures. Direct laser ablation using nanosecond pulses has been proven to provide an efficient way to create through and blind holes in 400 {mu}m thick SiC. When drilling through, openings in the front pads are formed, while blind holes stop {approx}40 {mu}m before the backside and were advanced to the electrical contact pad by subsequent plasma etching without an additional mask. Low induction connections (vias) between the transistor's source pads and the ground on the backside were formed by metallization of the holes. Micro vias having aspect ratios of 5-6 have been processed in 400 {mu}m SiC. The process flow from wafer layout to laser drilling is available including an automated beam alignment that allows a positioning accuracy of {+-}1 {mu}m with respect to existing patterns on the wafer. As proven by electrical dc and rf measurements the laser-assisted via technologies have successfully been implemented into fabrication of AlGaN/GaN high-power transistors.

  16. Horizontal well geosteering: planning, monitoring and geosteering

    Energy Technology Data Exchange (ETDEWEB)

    Mottahedeh, R.

    2008-11-15

    The geosteering process should not be seen as a process solely designated for the most expensive or highest profile horizontal wells. It can be regarded as another tool for improving the odds of success by remaining in the productive zone for longer periods of drilling. Also, it can be used to optimize the positioning of a horizontal wellbore in the sweet spots within the reservoir. The current process has been successfully applied to large infill drilling programs at over 40 wells for heavy oil, tight gas, conventional oil and gas plays and for Mannville coalbed methane (CBM) in Alberta. The service has been provided irrespective of location, as long as the Wellsite Information Transfer Standard Markup Language (WITSML)/Pason Satellite service is available. Exploration and production (E&P) companies are continuously being driven to reduce the cost per barrel of oil equivalent (BOE). E&P needs and technologies related to advanced and accurate directional drilling, communication of vital data in real-time through the internet, as well as reduced cycle time associated with advanced forward-looking 3D geo-modelling and visualization technologies, are currently converging. The motivation to reduce costs has been responsible for advancing the horizontal well geosteering process by incorporating the Measurement While Drilling (MWD) tool into mainstream drilling practices. The universal economic benefits gained can be found in all resource play types (conventional oil and gas, heavy oil, tight gas and coalbed methane). It is important to note that the process described here is essentially collaborative. For best results, there must be cooperation between the E&P operational geologist, wellsite geologist, directional driller and geo-modelling staff, as well as the engineering consultants involved in the project (i.e. the team as a whole).

  17. Model of the final borehole geometry for helical laser drilling

    Science.gov (United States)

    Kroschel, Alexander; Michalowski, Andreas; Graf, Thomas

    2018-05-01

    A model for predicting the borehole geometry for laser drilling is presented based on the calculation of a surface of constant absorbed fluence. It is applicable to helical drilling of through-holes with ultrashort laser pulses. The threshold fluence describing the borehole surface is fitted for best agreement with experimental data in the form of cross-sections of through-holes of different shapes and sizes in stainless steel samples. The fitted value is similar to ablation threshold fluence values reported for laser ablation models.

  18. Problems in the development of high-rank CBM horizontal wells in the Fanzhuang–Zhengzhuang Block in the Qinshui Basin and countermeasures

    Directory of Open Access Journals (Sweden)

    Yongping Zhang

    2017-11-01

    Full Text Available Coal reservoirs in the Qinshui Basin are characterized by high thermal evolution degree, low permeability, low reservoir pressure, lower gas saturation and strong heterogeneity, so its coalbed methane (CBM development is quite difficult. In this paper, the development practice of high-rank CBM horizontal wells in the Fanzhuang–Zhengzhuang Block was analyzed in terms of geological and engineering factors to clarify the productivity influencing factors, suitable geological conditions and potential tapping countermeasures of multi-lateral horizontal wells. It is shown that the reasons for the low development efficiency of multi-lateral horizontal wells are divided into three types. The first one is geological factor, such as encountering low CBM content areas or faults. The second is engineering factor, such as drilling fluid plugging, drilling collapse, drainage collapse and dust coal blockage. The third is the combination of both factors. It is concluded that encountering low CBM content areas and faults, collapse and blockage are the main reasons for the low production of multi-lateral horizontal wells in the Zhengzhuang–Fanzhuang Block, with the CBM content higher than 20 m3/t, the ratio of critical desorption pressure and reservoir pressure higher than 0.7 and vitrinite reflectance (Ro higher than 3.8. The prerequisite for an open-hole horizontal well in this area to produce CBM at a high rate is that the well lies in the tensile stress zone. Finally, the countermeasures to tap the potential of some inefficient wells were put forward. First, the inefficient wells which are blocked with dust coal or collapsed in the later stage should be stimulated based on classifications. And second, it is necessary to explore new types of horizontal wells so as to deal with borehole collapse and continue the operation in the later stage by using tree-like roof horizontal wells, single-lateral horizontal wells with casing or screen completion and fish

  19. Selected properties of laser cladding coatings shaped using Flow drill technology

    Directory of Open Access Journals (Sweden)

    Bartkowski Dariusz

    2017-01-01

    Full Text Available The paper presents the investigations of selected chemical and mechanical properties as well as macro- and microstructure of materials formed using thermal drilling process (Flow drill. The aim of this study was to determine the microstructure of the coatings produced using laser cladding with powder technology. The coatings were produced on the low-carbon steel using 1 kW disc laser. After modification of surface, the thermal drilling process was applied. To produce all coatings, the pure copper powder was used. In this study the laser power equal of 500, 700 and 900 W were used. The microstructure, chemical composition (EDS and microhardness were investigation. It was found that the surface modification of low carbon steel and next conducted thermal drilling process caused change the surface properties on the hole flange. It was found that surface modification of steel using laser cladding with cooper powder and next Flow drill process contributes to the change in microhardness and chemical composition on hole flange.

  20. Design and development of solid carbide step drill K34 for machining of CFRP and GFRP composite laminates

    Science.gov (United States)

    Rangaswamy, T.; Nagaraja, R.

    2018-04-01

    The Study focused on design and development of solid carbide step drill K34 to drill holes on composite materials such as Carbon Fiber Reinforced Plastic (CFRP) and Glass Fiber Reinforced Plastic (GFRP). The step drill K34 replaces step wise drilling of diameter 6.5mm and 9 mm holes that reduces the setup time, cutting speed, feed rate cost, delamination and increase the production rate. Several researchers have analyzed the effect of drilling process on various fiber reinforced plastic composites by carrying out using conventional tools and machinery. However, this process operation can lead to different kind of damages such as delamination, fiber pullout, and local cracks. To avoid the problems encountered at the time of drilling, suitable tool material and geometry is essential. This paper deals with the design and development of K34 Carbide step drill used to drill holes on CFRP and GFRP laminates. An Experimental study carried out to investigate the tool geometry, feed rate and cutting speed that avoids delamination and fiber breakage.

  1. Environmental Measurement-While-Drilling system for real-time field screening of contaminants

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Bishop, L.B.; Floran, R.J.; Williams, C.V.

    1995-01-01

    Sampling during environmental drilling is essential to fully characterize the spatial distribution and migration of near surface contaminants. However, the analysis of these samples is not only expensive, but can take weeks or months when sent to an off-site laboratory. In contrast, measurement-while-drilling (MWD) screening capability could save money and valuable time by quickly distinguishing between contaminated and uncontaminated areas. Real-time measurements provided by a MVM system would enable on-the-spot decisions to be made regarding sampling strategies, enhance worker safety, and provide the added flexibility of being able to ''steer'' the drill bit in or out hazardous zones. During measurement-while-drilling, down-hole sensors are located behind the drill bit and linked by a rapid data transmission system to a computer at the surface. As drilling proceeds, data are collected on the nature and extent of the subsurface contamination in real-time. The down-hole sensor is a Geiger-Mueller tube (GMT) gamma radiation detector. In addition to the GMT signal, the MWD system monitors these required down-hole voltages and two temperatures associated with the detector assembly. The Gamma Ray Detection System (GRDS) and electronics package are discussed in as well as the results of the field test. Finally, our conclusions and discussion of future work are presented

  2. Geological-geotechnical studies for siting the Superconducting Super Collider in Illinois: results of drilling large-diameter holes in 1986. Environmental geology notes

    International Nuclear Information System (INIS)

    Vaiden, R.C.; Hasek, M.J.; Gendron, C.R.; Curry, B.B.; Graese, A.M.

    1988-01-01

    The Illinois State Geological Survey (ISGS) has completed an extensive four-year exploration of the area near Fermi National Accelerator Laboratory (Fermilab) at Batavia, 30 miles west of Chicago. The comprehensive investigation was conducted to locate the most suitable site for construction and operation of the Superconducting Super Collider (SSC) - a 20-trillion electron volt (TeV) subatomic particle accelerator. Underlying the proposed site in northeastern Illinois, between 250 and 600 feet deep, are the Galena and Platteville dolomites - strong, stable, nearly impermeable bedrock. To confirm that these bedrock units are suitable for construction of the SSC, ISGS geologists designed a four-year study including test drilling, rock sampling and analysis, geophysical logging, hydrogeologic studies, and seismic exploration. Initially, the study covered parts of six counties. Subsequent research focused on successively smaller areas until the final stage of test drilling in spring 1986 concentrated on a proposed corridor for the SSC tunnel. From 1984 to 1986, thirty 3-inch-diameter test holes were drilled and more than 2 miles of bedrock core was recovered for stratigraphic description and geotechnical analysis

  3. Excavation and drilling at a spent-fuel test facility in granitic rock

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, W.C.; Mayr, M.C.

    1981-10-01

    Funding for a project to test the feasibility of safe and reliable storage and retrieval of spent fuel from a commercial nuclear reactor was approved by the Department of Energy on June 2, 1978. By May 28, 1980, 11 spent-fuel assemblies had been emplaced 420 m below the surface in the Climax granitic stock at the Nevada Test Site. Design and construction of the Spent Fuel Test-Climax, including fuel emplacement, had taken less than two years, at a total cost of $18.4 million. Construction activities were preceded by geologic exploration using four cored holes and existing underground workings. The sinking of a 0.76-m-diam shaft to the 420-m level initiated construction at the site. Effective rates of sinking varied from 0.16 m/h with a rotary tricone drill to 0.5 m/h with a hammer drill. Underground excavation included a central canister-storage drift 4.6 x 6.1 x 64 m long, two parallel 3.4 x 3.4-m heater drifts, and a tail drift. About 6700 m{sup 3} were excavated at an average rate of 2 m{sup 3}/h, and 178 cored holes, with diameters from 38 to 152 mm, were drilled. A total length of nearly 1100 m was drilled at rates ranging from 0.4 m/h to 1 m/h, depending on hole size and drilling equipment. Eighteen 610-mm-diam canister emplacement holes were hammer-drilled at an average rate of 1.4 m/h. The use of the critical path method, integrated contractors, and close cooperation between project participants facilitated completion of the project on schedule.

  4. Excavation and drilling at a spent-fuel test facility in granitic rock

    International Nuclear Information System (INIS)

    Patrick, W.C.; Mayr, M.C.

    1981-10-01

    Funding for a project to test the feasibility of safe and reliable storage and retrieval of spent fuel from a commercial nuclear reactor was approved by the Department of Energy on June 2, 1978. By May 28, 1980, 11 spent-fuel assemblies had been emplaced 420 m below the surface in the Climax granitic stock at the Nevada Test Site. Design and construction of the Spent Fuel Test-Climax, including fuel emplacement, had taken less than two years, at a total cost of $18.4 million. Construction activities were preceded by geologic exploration using four cored holes and existing underground workings. The sinking of a 0.76-m-diam shaft to the 420-m level initiated construction at the site. Effective rates of sinking varied from 0.16 m/h with a rotary tricone drill to 0.5 m/h with a hammer drill. Underground excavation included a central canister-storage drift 4.6 x 6.1 x 64 m long, two parallel 3.4 x 3.4-m heater drifts, and a tail drift. About 6700 m 3 were excavated at an average rate of 2 m 3 /h, and 178 cored holes, with diameters from 38 to 152 mm, were drilled. A total length of nearly 1100 m was drilled at rates ranging from 0.4 m/h to 1 m/h, depending on hole size and drilling equipment. Eighteen 610-mm-diam canister emplacement holes were hammer-drilled at an average rate of 1.4 m/h. The use of the critical path method, integrated contractors, and close cooperation between project participants facilitated completion of the project on schedule

  5. Development of a jet-assisted polycrystalline diamond drill bit

    Energy Technology Data Exchange (ETDEWEB)

    Pixton, D.S.; Hall, D.R.; Summers, D.A.; Gertsch, R.E.

    1997-12-31

    A preliminary investigation has been conducted to evaluate the technical feasibility and potential economic benefits of a new type of drill bit. This bit transmits both rotary and percussive drilling forces to the rock face, and augments this cutting action with high-pressure mud jets. Both the percussive drilling forces and the mud jets are generated down-hole by a mud-actuated hammer. Initial laboratory studies show that rate of penetration increases on the order of a factor of two over unaugmented rotary and/or percussive drilling rates are possible with jet-assistance.

  6. An experimental investigation on thermal exposure during bone drilling.

    Science.gov (United States)

    Lee, Jueun; Ozdoganlar, O Burak; Rabin, Yoed

    2012-12-01

    This study presents an experimental investigation of the effects of spindle speed, feed rate, and depth of drilling on the temperature distribution during drilling of the cortical section of the bovine femur. In an effort to reduce measurement uncertainties, a new approach for temperature measurements during bone drilling is presented in this study. The new approach is based on a setup for precise positioning of multiple thermocouples, automated data logging system, and a computer numerically controlled (CNC) machining system. A battery of experiments that has been performed to assess the uncertainty and repeatability of the new approach displayed adequate results. Subsequently, a parametric study was conducted to determine the effects of spindle speed, feed rate, hole depth, and thermocouple location on the measured bone temperature. This study suggests that the exposure time during bone drilling far exceeds the commonly accepted threshold for thermal injury, which may prevail at significant distances from the drilled hole. Results of this study suggest that the correlation of the thermal exposure threshold for bone injury and viability should be further explored. Copyright © 2012 IPEM. Published by Elsevier Ltd. All rights reserved.

  7. Advantages and limitations of remotely operated sea floor drill rigs

    Science.gov (United States)

    Freudenthal, T.; Smith, D. J.; Wefer, G.

    2009-04-01

    drilling. It has the advantage that the drill string stays in the drilled hole during the entire drilling process and prevents the drilled hole from collapsing while the inner core barrels comprising the drilled core sections are hooked up inside the drill string using a wire.

  8. Geochemistry of core samples of the Tiva Canyon Tuff from drill hole UE-25 NRG number-sign 3, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Peterman, Z.E.; Futa, K.

    1996-01-01

    The Tiva Canyon Tuff of Miocene age is composed of crystal-poor, high-silica rhyolite overlain by a crystal-rich zone that is gradational in composition from high-silica rhyolite to quartz latite. Each of these zones is divided into subzones that have distinctive physical, mineralogical, and geochemical features.Accurate identification of these subzones and their contacts is essential for detailed mapping and correlation both at the surface and in the subsurface in drill holes and in the exploratory studies facility (ESF). This report presents analyses of potassium (K), calcium (Ca), titanium (Ti), rubidium (Rb), strontium (Sr), yttrium (Y), zirconium (Zr), niobium (Nb), barium (Ba), lanthanum (La), and cerium (Ce) in core samples of the Tiva Canyon Tuff from drill hole UE-25 NRG number-sign 3. The concentrations of most of these elements are remarkably constant throughout the high-silica rhyolite, but at its upper contact with the crystal-rich zone, Ti, Zr, Ba, Ca, Sr, La, Ce, and K begin to increase progressively through the crystal-rich zone. In contrast, Rb and Nb decrease, and Y remains essentially constant. Initial 87 Sr/ 86 Sr ratios are relatively uniform in the high-silica rhyolite with a mean value of 0.7117, whereas initial 87 Sr/ 86 Sr ratios decrease upward in the quartz latite to values as low as 0.7090

  9. Characterization and Effects of Fiber Pull-Outs in Hole Quality of Carbon Fiber Reinforced Plastics Composite.

    Science.gov (United States)

    Alizadeh Ashrafi, Sina; Miller, Peter W; Wandro, Kevin M; Kim, Dave

    2016-10-13

    Hole quality plays a crucial role in the production of close-tolerance holes utilized in aircraft assembly. Through drilling experiments of carbon fiber-reinforced plastic composites (CFRP), this study investigates the impact of varying drilling feed and speed conditions on fiber pull-out geometries and resulting hole quality parameters. For this study, hole quality parameters include hole size variance, hole roundness, and surface roughness. Fiber pull-out geometries are quantified by using scanning electron microscope (SEM) images of the mechanically-sectioned CFRP-machined holes, to measure pull-out length and depth. Fiber pull-out geometries and the hole quality parameter results are dependent on the drilling feed and spindle speed condition, which determines the forces and undeformed chip thickness during the process. Fiber pull-out geometries influence surface roughness parameters from a surface profilometer, while their effect on other hole quality parameters obtained from a coordinate measuring machine is minimal.

  10. Statistical test of reproducibility and operator variance in thin-section modal analysis of textures and phenocrysts in the Topopah Spring member, drill hole USW VH-2, Crater Flat, Nye County, Nevada

    International Nuclear Information System (INIS)

    Moore, L.M.; Byers, F.M. Jr.; Broxton, D.E.

    1989-06-01

    A thin-section operator-variance test was given to the 2 junior authors, petrographers, by the senior author, a statistician, using 16 thin sections cut from core plugs drilled by the US Geological Survey from drill hole USW VH-2 standard (HCQ) drill core. The thin sections are samples of Topopah Spring devitrified rhyolite tuff from four textural zones, in ascending order: (1) lower nonlithophysal, (2) lower lithopysal, (3) middle nonlithophysal, and (4) upper lithophysal. Drill hole USW-VH-2 is near the center of the Crater Flat, about 6 miles WSW of the Yucca Mountain in Exploration Block. The original thin-section labels were opaqued out with removable enamel and renumbered with alpha-numeric labels. The sliders were then given to the petrographer operators for quantitative thin-section modal (point-count) analysis of cryptocrystalline, spherulitic, granophyric, and void textures, as well as phenocryst minerals. Between operator variance was tested by giving the two petrographers the same slide, and within-operator variance was tested by the same operator the same slide to count in a second test set, administered at least three months after the first set. Both operators were unaware that they were receiving the same slide to recount. 14 figs., 6 tabs

  11. Modeling Friction Performance of Drill String Torsional Oscillation Using Dynamic Friction Model

    Directory of Open Access Journals (Sweden)

    Xingming Wang

    2017-01-01

    Full Text Available Drill string torsional and longitudinal oscillation can significantly reduce axial drag in horizontal drilling. An improved theoretical model for the analysis of the frictional force was proposed based on microscopic contact deformation theory and a bristle model. The established model, an improved dynamic friction model established for drill strings in a wellbore, was used to determine the relationship of friction force changes and the drill string torsional vibration. The model results were in good agreement with the experimental data, verifying the accuracy of the established model. The analysis of the influence of drilling mud properties indicated that there is an approximately linear relationship between the axial friction force and dynamic shear and viscosity. The influence of drill string torsional oscillation on the axial friction force is discussed. The results indicated that the drill string transverse velocity is a prerequisite for reducing axial friction. In addition, low amplitude of torsional vibration speed can significantly reduce axial friction. Then, increasing the amplitude of transverse vibration speed, the effect of axial reduction is not significant. In addition, by involving general field drilling parameters, this model can accurately describe the friction behavior and quantitatively predict the frictional resistance in horizontal drilling.

  12. Process based analysis of manually controlled drilling processes for bone

    Science.gov (United States)

    Teicher, Uwe; Achour, Anas Ben; Nestler, Andreas; Brosius, Alexander; Lauer, Günter

    2018-05-01

    The machining operation drilling is part of the standard repertoire for medical applications. This machining cycle, which is usually a multi-stage process, generates the geometric element for the subsequent integration of implants, which are screwed into the bone in subsequent processes. In addition to the form, shape and position of the generated drill hole, it is also necessary to use a technology that ensures an operation with minimal damage. A surface damaged by excessive mechanical and thermal energy input shows a deterioration in the healing capacity of implants and represents a structure with complications for inflammatory reactions. The resulting loads are influenced by the material properties of the bone, the used technology and the tool properties. An important aspect of the process analysis is the fact that machining of bone is in most of the cases a manual process that depends mainly on the skills of the operator. This includes, among other things, the machining time for the production of a drill hole, since manual drilling is a force-controlled process. Experimental work was carried out on the bone of a porcine mandible in order to investigate the interrelation of the applied load during drilling. It can be shown that the load application can be subdivided according to the working feed direction. The entire drilling process thus consists of several time domains, which can be divided into the geometry-generating feed motion and a retraction movement of the tool. It has been shown that the removal of the tool from the drill hole has a significant influence on the mechanical load input. This fact is proven in detail by a new evaluation methodology. The causes of this characteristic can also be identified, as well as possible ways of reducing the load input.

  13. Use of neutron capture gamma radiation for determining grade of iron ore in blast holes and exploration holes

    International Nuclear Information System (INIS)

    Eisler, P.L.; Huppert, P.; Mathew, P.J.; Wylie, A.W.; Youl, S.F.

    1977-01-01

    Neutron radiative capture and neutron-neutron logging have been applied to determining the grade of ore in dry blast holes and a dry exploration hole drilled into a layered iron deposit. Both thermal and epithermal neutron responses were measured as well as the gamma-ray responses due to neutron capture by iron and by hydrogen present in hydrated minerals. The results were fitted by a stepwise multiple linear regression technique to give expressions for mean grade of ore in the drill hole and 95% confidence intervals for estimation of this mean. For an overall range of ore grades of 20-68% Fe and a mean grade of 63% Fe, the confidence interval for prediction of mean grade for the neutron-gamma technique was 0.3% Fe for pooled data from all five blast holes and 0.8% Fe for a single hole. It was also shown that for this type of layered deposit a simpler neutron-neutron log incorporating simultaneous measurement of both thermal and epithermal neutron responses gave almost as good a grade prediction result for pooled results from five drill holes, namely 63+-0.4% Fe, as that obtained by the neutron-gamma technique. The results of both types of log are compared with those obtained by the spectral gamma-ray backscattering [Psub(z)] technique, or by logging of natural gamma radiations from the shale component of the ore. From this comparison conclusions are drawn regarding the most suitable technique to employ for determining grade of iron ore in various practical logging situations. (author)

  14. Logging-while-drilling (LWD) pressure test

    Energy Technology Data Exchange (ETDEWEB)

    Thirud, Aase P.

    2003-07-01

    Statoil and Halliburton have completed a successful test of a new ground-breaking formation evaluation technology on the Norwegian shelf. An LWD formation tester, the GeoTapTM sensor, was used to quantify formation pressure during drilling operations. The inaugural job was completed by Halliburton's Sperry-Sun product service line onboard the Bideford Dolphin at the Borg Field while drilling a horizontal production well in the Vigdis Extension development. The GeoTap tool, part of Sperry-Sun's StellarTM MWD/LWT suite, was run in combination with a complete logging-while-drilling sensor package and the Geo-Pilot rotary steerable drilling system. Repeat formation pressures were taken and successfully transmitted to surface. This is the first time this type of technology has been successfully applied on the Norwegian shelf.

  15. Geologic report on the Sand Wash Drilling Project, Moffat and Routt Counties, Colorado

    Energy Technology Data Exchange (ETDEWEB)

    Carter, T.E.; Wayland, T.E.

    1981-09-01

    The Sand Wash Basin Drilling Project comprises twenty-seven (27) drill holes located in Moffat and Routt Counties, northwest Colorado, having an aggregate depth of 26,107.5 feet (7957.6 m). The holes penetrate the Browns Park Formation of Miocene age, which is a tuffaceous continental sandstone deposited in fluvial, eolian, and lacustrine environments. Partly based on project drilling results, uranium potential resource estimates for this formation in the $50/lb U/sub 3/O/sub 8/ forward-cost category have been increased by 34,476 tons U/sub 3/O/sub 8/ (35,036 metric tons). Three areas between Maybell and Craig, Colorado, considered favorable for uranium occurrences were verified as favorable by project drilling, and a fourth favorable area northwest of Maybell has been expanded. In addition, project drilling results indicate two new favorable areas, one north and northwest and one south of Steamboat Springs, Colorado. Anomalous radioactivity was detected in drill holes in all six study areas of the project. The most important factor in concentrating significant amounts of uranium in the target formation appears to be the availability of gaseous or liquid hydrocarbons and/or hydrogen sulfide gas as reductants. Where subjacent formations supply these reductants to the Browns Park Formation, project drilling encountered 0.05 percent to 0.01 percent uranium concentrations. Potential, though unproven, sources of these reductants are believed to underlie parts of all six project study areas.

  16. Geologic report on the Sand Wash Drilling Project, Moffat and Routt Counties, Colorado

    International Nuclear Information System (INIS)

    Carter, T.E.; Wayland, T.E.

    1981-09-01

    The Sand Wash Basin Drilling Project comprises twenty-seven (27) drill holes located in Moffat and Routt Counties, northwest Colorado, having an aggregate depth of 26,107.5 feet (7957.6 m). The holes penetrate the Browns Park Formation of Miocene age, which is a tuffaceous continental sandstone deposited in fluvial, eolian, and lacustrine environments. Partly based on project drilling results, uranium potential resource estimates for this formation in the $50/lb U 3 O 8 forward-cost category have been increased by 34,476 tons U 3 O 8 (35,036 metric tons). Three areas between Maybell and Craig, Colorado, considered favorable for uranium occurrences were verified as favorable by project drilling, and a fourth favorable area northwest of Maybell has been expanded. In addition, project drilling results indicate two new favorable areas, one north and northwest and one south of Steamboat Springs, Colorado. Anomalous radioactivity was detected in drill holes in all six study areas of the project. The most important factor in concentrating significant amounts of uranium in the target formation appears to be the availability of gaseous or liquid hydrocarbons and/or hydrogen sulfide gas as reductants. Where subjacent formations supply these reductants to the Browns Park Formation, project drilling encountered 0.05 percent to 0.01 percent uranium concentrations. Potential, though unproven, sources of these reductants are believed to underlie parts of all six project study areas

  17. Drilling a better pair : new technologies in SAGD directional drilling

    Energy Technology Data Exchange (ETDEWEB)

    Zimmer, C.; Richter, D. [Statoil Canada Ltd., Calgary, AB (Canada); Person, J.; Tilley, J.; Bittar, M. [Halliburton Energy Services, Calgary, AB (Canada)

    2010-07-01

    The Leismer Demonstration Project (LDP) is the first of 8 proposed major steam assisted gravity drainage (SAGD) projects for Statoil's Kai Kos Dehseh (KKD) asset in the Athabasca oil sands deposit. The bitumen resources are expected to produce approximately 2.2 billion barrels of oil over approximately 35 years with a peak production of 220,000 bbl/day. To date, 23 well pairs have been drilled on 4 drilling pads. The precise placement of well pairs is among the most important factors in a successful SAGD drilling program. The producer well must be placed in relation to the reservoir boundaries. It must also be accurately twinned with the injector well. A strong focus on technological innovation is needed in order to deliver on these high expectations in unconsolidated formations, such as the McMurray oil sands. Lateral SAGD pairs are often drilled with conventional steerable mud motors and logging-while-drilling (LWD) resistivity measurements, but this combination imposes certain limitations in terms of wellbore quality and placement. Several industry firsts were successfully implemented at the Statoil LDP, including a combination of the newest and most cutting-edge directional, measurement, and LWD technology. The keystone of these industry firsts was the use of a soft formation modified, point-the-bit rotary steerable system (RSS), used on 20 horizontal wells. The RRS was combined with an ultra deep azimuthal resistivity sensor to provide precise geosteering along the bottom bed boundary in the producer wells, resulting in improved reservoir capture and reservoir characterization. This paper described the new drilling system and its impact on the progressive future of directional drilling in SAGD. 8 refs., 1 tab., 22 figs.

  18. Unconventional Oil Reserves Development in the Viking Play (Western Canada Using Horizontal Wells and Hydraulic Fracturing

    Directory of Open Access Journals (Sweden)

    T.B. Baishev

    2017-09-01

    Full Text Available Oil production from the Viking play in Saskatchewan province started in the 1950s and continues since that time. Horizontal drilling and multistage fracturing have caused resurgence in development of this play. Based on the production data from several fields, the comparative results of the Viking play development using vertical and horizontal wells are presented. Horizontal wells drilling made it possible to increase oil production in those formation zones that were previously considered predominantly gas-saturated, as well as in the zones affected by water injection using vertical wells in order to maintain reservoir pressure. Infill drilling combined with longer lateral completion length also positively affected the development of oil reserves from the Viking play.

  19. Improving recovery efficiency of water-drive channel sandstone reservoir by drilling wells laterally

    Energy Technology Data Exchange (ETDEWEB)

    Zhiguo, F.; Quinglong, D.; Pingshi, Z.; Bingyu, J.; Weigang, L. [Research Institute of Exploration and Development, Daqing (China)

    1998-12-31

    Example of drilling a horizontal well in reservoir rock of only four meter thick by using existing casing pipe of low efficiency vertical wells to induce production in the top remaining reservoir is described. The experience shows that drilling horizontal wells laterally in thin bodies of sandstone reservoirs and improve their productivity is a feasible proposition. Productivity will still be low, but it can be improved by well stimulation. 3 refs., 3 figs.

  20. Optimization of hole generation in Ti/CFRP stacks

    Science.gov (United States)

    Ivanov, Y. N.; Pashkov, A. E.; Chashhin, N. S.

    2018-03-01

    The article aims to describe methods for improving the surface quality and hole accuracy in Ti/CFRP stacks by optimizing cutting methods and drill geometry. The research is based on the fundamentals of machine building, theory of probability, mathematical statistics, and experiment planning and manufacturing process optimization theories. Statistical processing of experiment data was carried out by means of Statistica 6 and Microsoft Excel 2010. Surface geometry in Ti stacks was analyzed using a Taylor Hobson Form Talysurf i200 Series Profilometer, and in CFRP stacks - using a Bruker ContourGT-Kl Optical Microscope. Hole shapes and sizes were analyzed using a Carl Zeiss CONTURA G2 Measuring machine, temperatures in cutting zones were recorded with a FLIR SC7000 Series Infrared Camera. Models of multivariate analysis of variance were developed. They show effects of drilling modes on surface quality and accuracy of holes in Ti/CFRP stacks. The task of multicriteria drilling process optimization was solved. Optimal cutting technologies which improve performance were developed. Methods for assessing thermal tool and material expansion effects on the accuracy of holes in Ti/CFRP/Ti stacks were developed.

  1. Brushy Basin drilling project, Cedar Mountain, Emergy County, Utah

    International Nuclear Information System (INIS)

    Kiloh, K.D.; McNeil, M.; Vizcaino, H.

    1980-03-01

    A 12-hole drilling program was conducted on the northwestern flank of the San Rafael swell of eastern Utah to obtain subsurface geologic data to evaluate the uranium resource potential of the Brushy Basin Member of the Morrison Formation (Jurassic). In the Cedar Mountain-Castle Valley area, the Brushy Basin Member consists primarily of tuffaceous and carbonaceous mudstones. Known uranium mineralization is thin, spotty, very low grade, and occurs in small lenticular pods. Four of the 12 drill holes penetrated thin intervals of intermediate-grade uranium mineralization in the Brushy Basin. The study confirmed that the unit does not contain significant deposits of intermediate-grade uranium

  2. Implementation and Development of the Incremental Hole Drilling Method for the Measurement of Residual Stress in Thermal Spray Coatings

    Science.gov (United States)

    Valente, T.; Bartuli, C.; Sebastiani, M.; Loreto, A.

    2005-12-01

    The experimental measurement of residual stresses originating within thick coatings deposited by thermal spray on solid substrates plays a role of fundamental relevance in the preliminary stages of coating design and process parameters optimization. The hole-drilling method is a versatile and widely used technique for the experimental determination of residual stress in the most superficial layers of a solid body. The consolidated procedure, however, can only be implemented for metallic bulk materials or for homogeneous, linear elastic, and isotropic materials. The main objective of the present investigation was to adapt the experimental method to the measurement of stress fields built up in ceramic coatings/metallic bonding layers structures manufactured by plasma spray deposition. A finite element calculation procedure was implemented to identify the calibration coefficients necessary to take into account the elastic modulus discontinuities that characterize the layered structure through its thickness. Experimental adjustments were then proposed to overcome problems related to the low thermal conductivity of the coatings. The number of calculation steps and experimental drilling steps were finally optimized.

  3. Better well control through safe drilling margin identification, influx analysis and direct bottom hole pressure control method for deep water

    Energy Technology Data Exchange (ETDEWEB)

    Veeningen, Daan [National Oilwell Varco IntelliServ (NOV), Houston, TX (United States)

    2012-07-01

    Currently, well control events are almost exclusively detected by using surface measurements. Measuring a volume increase in the 'closed loop' mud circulation system; a standpipe pressure decrease; or changes in a variety of drilling parameters provide indicators of a kick. Especially in deep water, where the riser comprises a substantial section of the well bore, early kick detection is paramount for limiting the severity of a well bore influx and improve the ability to regain well control. While downhole data is presently available from downhole tools nearby the bit, available data rates are sparse as mud pulse telemetry bandwidth is limited and well bore measurements compete with transmission of other subsurface data. Further, data transfer is one-directional, latency is significant and conditions along the string are unknown. High-bandwidth downhole data transmission system, via a wired or networked drill string system, has the unique capability to acquire real-time pressure and temperature measurement at a number of locations along the drill string. This system provides high-resolution downhole data available at very high speed, eliminating latency and restrictions that typically limit the availability of downhole data. The paper describes well control opportunities for deep water operations through the use of downhole data independent from surface measurements. First, the networked drill string provides efficient ways to identify pore pressure, fracture gradient, and true mud weight that comprise the safe drilling margin. Second, the independent measurement capability provides early kick detection and improved ability to analyze an influx even with a heterogeneous mud column through distributed along-string annular pressure measurements. Third, a methodology is proposed for a direct measurement method using downhole real-time pressure for maintaining constant bottom hole pressure during well kills in deep water. (author)

  4. Research on technical and technological parameters of inclined drilling

    Directory of Open Access Journals (Sweden)

    М. В. Двойников

    2017-03-01

    Analysis of investigation results showed that the main source of oscillations is linked to bending and compressing stresses, caused by well deviations as well as rigidity of the drilling tool. In effect, in the bottom-hole assembly occur auto-oscillations, making it impossible to correct azimuth and zenith angles. Alteration of rigidity in the bottom part of the tool and drilling parameters, implying reduced rotation speed of the drill string and regulation of drill bit pressure, can partially solve this problem, though increase in rotation speed is limited by technical characteristics of existing top drive systems.

  5. Core drilling of drillholes OL-PP66-69 at Olkiluoto 2008

    International Nuclear Information System (INIS)

    Kuusirati, J.; Tarvainen, A.-M.

    2009-04-01

    Suomen Malmi Oy (Smoy) core drilled four 24.88 - 25.39 m long investigation drillholes at Olkiluoto in June 2008. The identification numbers of the holes are OL-PP66, OL-PP67, OL-PP68 and OL-PP69. The drillholes are 75.7 mm by diameter. Drillholes were core drilled with the diamond drill rig Diamec 1000. The drilling water was taken from the ONKALO drilling water pipeline and premixed sodium fluorescein was used as a label agent in the drilling water. The labelled drilling water was driven to the drilling places in a tank. In addition to drilling the drill cores were logged and reported by geologist. During geological investigation the following parameters were logged: lithology, foliation, fracture parameters, fractured zones, core loss, weathering, fracture frequency, RQD and rock quality. The main rock types in the drillholes are diatexitic and veined gneisses and pegmatitic granite. The average fracture frequency in holes varied from 3.9 pcs/m to 5.8 pcs/m. The average RQD values varied from 84 % to 93 %. In the drillhole OL-PP66 two fractured zones were penetrated and in OL-PP69 one fractured zone. The drill cores OL-PP67 and OL-PP68 showed no fractured zones. Smoy also carried out optical imaging of the drillholes. The assignment included the field work and the data processing. This report describes the field operation, the equipment as well as the processing procedures and shows the obtained results and their quality. The raw and processed data are delivered digitally in WellCAD and PDF format. (orig.)

  6. The final frontier: Tesco takes evolution of casing drilling system offshore

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.

    2000-04-01

    Tesco Corporation is complementing its smaller 4 1/2-inch casing-while-drilling (CWD) tools by designing a series of 13 3/8-inch and a 9 5/8-inch underreamers and cutters to accommodate the larger diameter holes typical of offshore drilling. Tesco is building its own rig; it is a single rated to 3,000 metres that can be moved in seven loads with an overall 100 ton load rating. The unit features dimensional drilling capability in addition to features such as logging-while-drilling, and measurement-while-drilling. A conventional coring unit is employed via wireline. To date, Tesco has successfully overcome two of the main challenges in developing the new drilling process, i. e. to guarantee that casing can be run in high compression loads without damage to connections, and to develop an underreamer cutting structure to destroy rock at a rate comparable to conventional rotary drilling. The wireline retrieval system, which is 100 per cent reliable in running mode, but only 70 per cent successful in the retrieval mode, is the next challenge to be overcome. Tesco claims a 40 per cent reduction in overall 'spud to release' time, however, the main advantage claimed for the system is that the casing system protects the integrity of the hole as it is being drilled.

  7. Experience with drilling and blasting work during construction of Mochovce nuclear power plant

    International Nuclear Information System (INIS)

    Mraz, M.; Vojta, A.; Podel, R.

    1986-01-01

    The results are discussed of four years of investigating the technical and economic parameters of drilling and blasting equipment employed on the building site of the Mochovce nuclear power plant. The technical and operating characteristics are given of tested breaking and drilling sets manufactured by various foreign companies. The final choice was based on output, hard currency prices, power demand, operating reliability and number of personnel required for operation. The optimal set consists of two Hausherr HBM 70 drilling systems (holes with a diameter of 130 to 150 mm) and two ROC 601-02 Atlas Copco machines (auxiliary work, breaking foundation holes for nuclear reactors). (J.C.)

  8. NEW APPROACHES TO THE IMPLEMENTATION OF THE MINING TECHNOLOGY OF DIMENSION STONE USING A CLOSE-SET DRILLING

    Directory of Open Access Journals (Sweden)

    S. V. Kalchuk

    2017-04-01

    Full Text Available The analysis of the current state the non-blasting monolith extraction technology was conducted. The further research direction was substantiated. Has been considered and justified the rational parameters of close-set drilling technology of dimension stones. Solution is offered that consist the combined drilling (a close-set and a holes line drilling, that provides to increase of stone splitting efficiency under its own weight. The calculation of the parameters of the scheme of partial underdrilling at a monolith of stone with the purpose of reducing the volume of drilling works is given. Diagrams of tensile stress changes depending on the specific area of splitting were built. A rational correlation between the drilling parameters of the holes has been established by solving the problems of loading the cantilever beam and stress concentration by the Kirsch solution. The most important parameter for the implementation of this technology is the ratio of monoloth hight to its length. Engineering formulas are proposed for calculating the technological parameters of the realization of the “gravitational-hole” stone splitting. The configuration of a rough block of stones is determined under which this technology can be realized. Creating of close-set holes provides the increase of maximal tensile stress with equal values of specific splitting area ratio. It is established that the effective drilling depth of close-set holes is 43,2 % of monolith height. It is estimated that combined drilling method application of savings from drilling operation will be 11,36 %.

  9. Interaction between drilled shaft and mechanically stabilized earth (MSE) wall : project summary.

    Science.gov (United States)

    2015-08-31

    Drilled shafts are being constructed within the reinforced zone of mechanically stabilized earth (MSE) walls (Figure 1). The drilled shafts may be subjected to horizontal loads and push against the front of the wall. Distress of MSE wall panels has b...

  10. Rock melting technology and geothermal drilling

    Science.gov (United States)

    Rowley, J. C.

    1974-01-01

    National awareness of the potential future shortages in energy resources has heightened interest in exploration and utilization of a variety of geothermal energy (GTE) reservoirs. The status of conventional drilling of GTE wells is reviewed briefly and problem areas which lead to higher drilling costs are identified and R and D directions toward solution are suggested. In the immediate future, an expanded program of drilling in GTE formations can benefit from improvements in drilling equipment and technology normally associated with oil or gas wells. Over a longer time period, the new rock-melting drill bits being developed as a part of the Los Alamos Scientific Laboratory's Subterrene Program offer new solutions to a number of problems which frequently hamper GTE drilling, including the most basic problem - high temperature. Two of the most favorable characteristics of rock-melting penetrators are their ability to operate effectively in hot rock and produce glass linings around the hole as an integral part of the drilling process. The technical advantages to be gained by use of rock-melting penetrators are discussed in relation to the basic needs for GTE wells.

  11. Results from Testing of Two Rotary Percussive Drilling Systems

    Science.gov (United States)

    Kriechbaum, Kristopher; Brown, Kyle; Cady, Ian; von der Heydt, Max; Klein, Kerry; Kulczycki, Eric; Okon, Avi

    2010-01-01

    The developmental test program for the MSL (Mars Science Laboratory) rotary percussive drill examined the e ect of various drill input parameters on the drill pene- tration rate. Some of the input parameters tested were drill angle with respect to gravity and percussive impact energy. The suite of rocks tested ranged from a high strength basalt to soft Kaolinite clay. We developed a hole start routine to reduce high sideloads from bit walk. The ongoing development test program for the IMSAH (Integrated Mars Sample Acquisition and Handling) rotary percussive corer uses many of the same rocks as the MSL suite. An additional performance parameter is core integrity. The MSL development test drill and the IMSAH test drill use similar hardware to provide rotation and percussion. However, the MSL test drill uses external stabilizers, while the IMSAH test drill does not have external stabilization. In addition the IMSAH drill is a core drill, while the MSL drill uses a solid powdering bit. Results from the testing of these two related drilling systems is examined.

  12. Microgravity Drill and Anchor System

    Science.gov (United States)

    Parness, Aaron; Frost, Matthew A.; King, Jonathan P.

    2013-01-01

    microspine toes that independently find holes and ledges on a rock to create an anchor. Once the system is anchored, a linear translation mechanism moves the drill axially into the surface while maintaining the proper WOB. The linear translation mechanism is composed of a ball screw and stepper motor that can translate a carriage with high precision and applied load. The carriage slides along rails using self-aligning linear bearings that correct any axial misalignment caused by bending and torsion. The carriage then compresses a series of springs that simultaneously transmit the load to the drill along the bit axis and act as a suspension that compensates for the vibration caused by percussive drilling. The drill is a compacted, modified version of an off-the-shelf rotary percussive drill, which uses a custom carbide-tipped coring bit. By using rotary percussive drilling, the drill time is greatly reduced. The percussive action fractures the rock debris, which is removed during rotation. The final result is a 0.75-in. (.1.9- cm) diameter hole and a preserved 0.5- in. (.1.3-cm) diameter rock core. This work extends microspine technology, making it applicable to astronaut missions to asteroids and a host of robotic sampling concepts. At the time of this reporting, it is the first instrument to be demonstrated using microspine anchors, and is the first self-contained drill/anchor system to be demonstrated that is capable of drilling in inverted configurations and would be capable of drilling in microgravity.

  13. Self-cleaning effect in high quality percussion ablating of cooling hole by picosecond ultra-short pulse laser

    Science.gov (United States)

    Zhao, Wanqin; Yu, Zhishui

    2018-06-01

    Comparing with the trepanning technology, cooling hole could be processed based on the percussion drilling with higher processing efficiency. However, it is widely believed that the ablating precision of hole is lower for percussion drilling than for trepanning, wherein, the melting spatter materials around the hole surface and the recast layer inside the hole are the two main issues for reducing the ablating precision of hole, especially for the recast layer, it can't be eliminated completely even through the trepanning technology. In this paper, the self-cleaning effect which is a particular property just for percussion ablating of holes has been presented in detail. In addition, the reasons inducing the self-cleaning effect have been discussed. At last, based on the self-cleaning effect of percussion drilling, high quality cooling hole without the melting spatter materials around the hole surface and recast layer inside the hole could be ablated in nickel-based superalloy by picosecond ultra-short pulse laser.

  14. The effect of drilling parameters for surface roughness in drilling of AA7075 alloy

    Directory of Open Access Journals (Sweden)

    Yaşar Nafiz

    2017-01-01

    Full Text Available AA7075 aluminum alloy has been very popular significantly interest in the production of structural components in automotive and aviation applications due to its high strength, low density, good plasticity and better machinability comparable to many metals. Particularly, final products must have uniformly high quality to ensure essential safety standards in the aircraft industry. The optimization of hole quality which can variable according to tool geometry and drilling parameters is important in spite of high machinability rate of AA7075 alloy. In this study, the effects of drilling parameters on average surface roughness (Ra has been investigated in drilling of AA7075 with tungsten carbide drills. Machining experiments were performed with three different drill point angles and three different levels of cutting parameters (feed rate, cutting speed. The effects of drilling parameters on thrust force has been determined with ANOVA in %95 confidence level. Feed rate was determined as the most important factor on Ra according to ANOVA results. Moreover, it was shown that increasing feed rate leads to increase of Ra while increasing drill point angle leads to decrease of Ra. The optimum surface roughness was obtained with point angle of 130°, cutting speed of 40 m/min and feed rate of 0.1 mm/rev, thereby the validity of optimization was confirmed with Taguchi method.

  15. Benefits of obtaining log data in horizontal wells in the WCSB

    Energy Technology Data Exchange (ETDEWEB)

    Spratt, D. [Reeves Wireline Technologies Ltd., Calgary, AB (Canada)

    2001-11-01

    A Compact Memory Logging (CML) system developed by Reeves Wireline Technologies was presented. It can be used to obtain log data from horizontal wells to get a better understanding of how to enhance production or completion techniques. The methods that are commonly used to obtain data from horizontal wells include measurement while drilling (MWD), logging while drilling (LWD), wet connect pipe conveyed wireline logging and CML. Each method has its unique benefits that range from information on lithology, rock parameters and fluid interfaces. Reeves has been using wireless pipe conveyed CML over the past two years. The log data includes array induction, dual spaced neutron and photo density porosity, Pe, gamma ray, compensated sonic and hose size caliper. Reeves CML is smaller, easily conveyed and has an unprecedented capability to bend and is considered to be well suited for both newly and previously drilled horizontal wells that require remedial assessment. The tool can be used to determine reservoir quality and boundaries, establish zone structures, or identify fluid interfaces for strategic planning of completions and stimulations. This paper presented examples of logs on some horizontal wells that indicate the value of obtaining log data. Reeves CML is considered to be economically and operationally ideal, particularly since data from the CML includes depth of investigation. 5 figs.

  16. Feasibility of Optimizing Recovery and Reserves from a Mature and Geological Complex Multiple Turbidite Offshore Calif. Reservoir through the Drilling and Completion of a Trilateral Horizontal Well

    International Nuclear Information System (INIS)

    Coombs, Steven F.

    1999-01-01

    The main objective of this project is to devise an effective redevelopment strategy to combat producibility problems related to the Repetto turbidite sequences of the Carpinteria Field. The lack of adequate reservoir characterization, high-water cut production, and scaling problems have in the past contributed to the field's low productivity. To improve productivity and enhance recoverable reserves, the following specific goals are proposed: (1) Develop an integrated database of all existing data from work done by the former ownership group. (2) Expand reservoir drainage and reduce sand problems through horizontal well drilling and completion. (3) Operate and validate reservoirs' conceptual model by incorporating new data from the proposed trilateral well. (4) Transfer methodologies employed in geologic modeling and drilling multilateral wells to other operators with similar reservoirs

  17. NNWSI [Nevada Nuclear Waste Storage Investigations] hole histories

    International Nuclear Information System (INIS)

    1986-11-01

    This report is a compilation of data from sixteen boreholes drilled under the guidance of the US Geological Survey to help identify the area's water table. The sixteen boreholes were drilled between April 1983 and November 1983 in Area 25, Nevada Test Site land and in Bureau of Land Management land adjacent to the Nevada Test Site. Data presented in the hole histories include all locations, daily activities, review of hole conditions, geophysical log lists, video tape lists, and microfiche copies of the geophysical logs run by the Fenix and Scisson, Inc. subcontractor

  18. Requirements for drilling and disposal in deep boreholes; Foerutsaettningar foer borrning av och deponering i djupa borrhaal

    Energy Technology Data Exchange (ETDEWEB)

    Oden, Anders [QTOB, Haesselby (Sweden)

    2013-09-15

    In this report experience from drilling at great depth in crystalline rock is compiled based on project descriptions, articles and personal contacts. Rock mechanical effects have been analyzed. The report also describes proposals made by SKB and other agencies regarding the disposal of and closure of deep boreholes. The combination of drilling deep with large diameter in crystalline rocks have mainly occurred in various research projects, such as in the German KTB project. Through these projects and the increased interest in recent years for geothermal energy , today's equipment is expected to be used to drill 5000 m deep holes , with a hole diameter of 445 mm , in crystalline rock. Such holes could be used for the disposal of spent nuclear fuel. With the deposition technique recently described by Sandia National Laboratories in USA, SKB estimates that it might be possible to implement the disposal to 5000 m depth. Considering the actual implementation, drilling and disposal, and the far-reaching requirements on nuclear safety and radiation protection, it is considered an important risk getting stuck with the capsule-string, or part of it, above deposition zone without being able to get it loose. In conclusion, even if the drilling and the deposit would succeed there remains to verify that the drill holes with the deposited canisters meet the initial requirements and is long-term safe.

  19. Steel, hard metal and diamonds. The history of drilling blast holes in mining and tunneling; Stahl, Hartmetall und Diamanten. Zur Geschichte des Sprenglochbohrens im Berg- und Tunnelbau

    Energy Technology Data Exchange (ETDEWEB)

    Feistkorn, E. [Inst. fuer Vortrieb und Gewinnung, DMT-Gesellschaft fuer Forschung und Pruefung mbH, Essen (Germany)

    1997-12-31

    Beginning of the blasting technique in mining and tunneling during the 17th century required drilling holes to take the explosive. Following the use of hammer and wedge, drilling was done over a long period of time by hand with mallet and drillsteel. Continuously, during the 19th century the handwork was replaced by drilling machines. Technically, the evolution of drilling equipment is marked by electrohydraulic control and automatization with the assistance of microelectronics. Regarding the material, the introduction of hard metal and - in addition for rotary drilling - the development of synthetic diamond material are the main features. (orig.) [Deutsch] Mit der Einfuehrung der Sprengtechnik im Bergbau und Tunnelbau im 17. Jahrhundert mussten verfahrensbedingt Bohrloecher zur Aufnahme des Sprengstoffes hergestellt werden. In Anlehnung an die Arbeit mit Schlaegel und Eisen erfolgte dies lange Zeit manuell mit dem Bohrfaeustel und Stahlbohrern. Die Handarbeit wurde waehrend der 2. Haelfte des 19. Jahrhunderts kontinuierlich durch Bohrmaschinen verdraengt. Maschinentechnisch ist die weitere Entwicklung durch elektrohydraulische Steuerungen und die Automatisierung der Bohrgeraete mit Hilfe der Mikroelektronik gekennzeichnet. Materialtechnisch stellen die Einfuehrung des Hartmetalls und beim drehenden Bohren zusaetzlich die Entwicklung synthetischer Diamantwerkstoffe die herausragenden Marksteine dar. (orig.)

  20. A Universal Rig for Supporting Large Hammer Drills: Reduced Injury Risk and Improved Productivity.

    Science.gov (United States)

    Rempel, David; Barr, Alan

    2015-10-01

    Drilling holes into concrete with heavy hammer and rock drills is one of the most physically demanding tasks performed in commercial construction and poses risks for musculoskeletal disorders, noise induced hearing loss, hand arm vibration syndrome and silicosis. The aim of this study was to (1) use a participatory process to develop a rig to support pneumatic rock drills or large electric hammer drills in order to reduce the health risks and (2) evaluate the usability of the rig. Seven prototype rigs for supporting large hammer drills were developed and modified with feedback from commercial contractors and construction workers. The final design was evaluated by laborers and electricians (N=29) who performed their usual concrete drilling with the usual method and the new rig. Subjective regional fatigue was significantly less in the neck, shoulders, hands and arms, and lower back) when using the universal rig compared to the usual manual method. Usability ratings for the rig were significantly better than the usual method on stability, control, drilling, accuracy, and vibration. Drilling time was reduced by approximately 50% with the rig. Commercial construction contractors, laborers and electricians who use large hammer drills for drilling many holes should consider using such a rig to prevent musculoskeletal disorders, fatigue, and silicosis.

  1. Tragacanth gum: an effective oil well drilling fluid additive

    Energy Technology Data Exchange (ETDEWEB)

    Mahto, V.; Sharma, V. [Indian School of Mines, Dhanbad (India). Department of Petroleum Engineering

    2005-02-15

    The low penetration rate, excessive torque and drag, poor hole cleaning and formation damage are major impediments in drilling oil and gas well. These have a major impact on drilling efficiency and well economics. Keeping these in mind, an attempt was made to design a water based drilling fluid system using Indian bentonite clays and tragacanth gum. The effect of tragacanth gum on rheological behavior of three different Indian bentonite water suspensions was studied and a drilling fluid system was developed. The filtrates of these drilling fluids were subjected to formation damage study on the field core using Ruska Liquid Permeameter. The laboratory investigation furnishes that tragacanth gum acts as a good viscosifier and fluid loss control agent. The drilling fluid filtrate also has less effect on formation damage. (author)

  2. Application of air hammer drilling technology in igneous rocks of Junggar basin

    Science.gov (United States)

    Zhao, Hongshan; Feng, Guangtong; Yu, Haiye

    2018-03-01

    There were many technical problems such as serious well deviation, low penetration rate and long drilling cycle in igneous rocks because of its hardness, strong abrasive and poor drillability, which severely influenced the exploration and development process of Junggar basin. Through analyzing the difficulties of gas drilling with roller bits in Well HS 2, conducting the mechanics experiments about igneous rock, and deeply describing the rock-breaking mechanism of air hammer drilling and its adaptability in igneous rocks, air hammer drilling can realize deviation control and fast drilling in igneous rocks of piedmont zone and avoid the wear and fatigue fracture of drilling strings due to its characteristics of low WOB, low RPM and high frequency impact. Through firstly used in igneous rocks of Well HS 201, compared with gas drilling with cone bit, the average penetration rate and one-trip footage of air hammer drilling respectively increased by more than 2.45 times and 6.42 times while the well deviation was always controlled less than 2 degrees. Two records for Block HS were set up such as the fastest penetration rate of 14.29m/h in Φ444.5mm well hole and the highest one-trip footage of 470.62m in Φ311.2mm well hole. So air hammer drilling was an effective way to realize optimal and fast drilling in the igneous rock formation of Junggar basin.

  3. 76 FR 76689 - Cibola National Forest, Mount Taylor Ranger District, NM, Mount Taylor Combined Exploratory Drilling

    Science.gov (United States)

    2011-12-08

    ... National Forest, Mount Taylor Ranger District, NM, Mount Taylor Combined Exploratory Drilling AGENCY... proposed action is to approve two Plans of Operations for exploratory uranium drilling on the Cibola... San Mateo. In total, there are up to 279 drill holes that would be drilled over a period not to exceed...

  4. Vacuum drilling of unsaturated tuffs at a potential radioactive-waste repository, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Whitfield, M.S.

    1985-01-01

    A vacuum reverse-air circulation drilling method was used to drill two 17-1/2-inch (44.5-centimeter) diameter test holes to depths of 1269 feet (387 meters) and 1887 feet (575 meters) at Yucca Mountain near the Nevada Test Site. The site is being considered by the US Department of Energy for construction of a high-level radioactive-waste repository. One of these two test holes (USW UZ-1) has been equipped with instrumentation to obtain a long-term record of pressure and moisture potential data; the other test hole (USW UZ-6) will be similarly instrumented in the near future. These investigations are being conducted as part of the Nevada Nuclear Waste Storage Investigations Project of the US Department of Energy. The test holes were drilled using a 5-1/2-inch (14-centimeter) by 8-5/8-inch (22-centimeter) dual-string reverse-vacuum assembly. A vacuum, induced at the land surface, removed the drill cuttings through the inner string. Compressed air was injected into the dual-string annulus to cool the bit and to keep the bit and inner string clean. A tracer gas, sulfur hexafluoride (SF 6 ), was added to the compressed air for a later determination of atmospheric contamination that might have occurred during the drilling. After reaching the surface, the drill cuttings were routed to a dry separator for sample collection. Then return air and dust from the cuttings were routed to a wet separator where the dust was removed by a water spray, and the remaining air was exhausted through the vacuum unit (blower) to the atmosphere. 6 refs., 4 figs

  5. Hydrodynamics of the Fluid Filtrate on Drilling-In

    Science.gov (United States)

    Abbasov, É. M.; Agaeva, N. A.

    2014-01-01

    The volume of the liquid penetrating into the formation after drilling-in has been determined on the basis of theoretical investigations. The dynamics of change in the bottom-hole pressure has been determined in this process. It has been shown that because of the water hammer, the bottom-hole pressure can be doubled in the presence of large fractures and pores closer to the well-bottom zone.

  6. Chemistry and geothermometry of brine produced from the Salton Sea Scientific drill hole, Imperial Valley, California

    Science.gov (United States)

    Thompson, J.M.; Fournier, R.O.

    1988-01-01

    The December 29-30, 1985, flow test of the State 2-14 well, also known as the Salton Sea Scientific drill hole, produced fluid from a depth of 1865-1877 m at a reservoir temperature of 305????5??C. Samples were collected at five different flashing pressures. The brines are Na-Ca-K-Cl-type waters with very high metal and low SO4 and HCO3 contents. Compositions of the flashed brines were normalized relative to the 25??C densities of the solutions, and an ionic charge balance was achieved by adjusting the Na concentration. Calculated Na/K geothermometer temperatures, using equations suggested by different investigators, range from 326?? to 364??C. The Mg/K2 method gives a temperature of about 350??C, Mg/Li2 about 282??, and Na/Li 395??-418??C. -from Authors

  7. ResonantSonic drilling: History, progress, and advances in environmental restoration programs

    International Nuclear Information System (INIS)

    Moak, D.J.

    1995-01-01

    ResonantSonic drilling is being used in the environmental industry to drill faster, cheaper, and safer than conventional drilling methodologies. The ResonantSonic drilling method requires no mud, air, or water for rapid penetration through geologic materials ranging from rock and clay to sand and boulders. A specialized drill head imparts high frequency vibrations into steel drill pipe and creates a drilling action which allows the retrieval of continuous, undisturbed cores. An added benefit is that the method can be used for angle drilling. The ResonantSonic method has been used in the past for projects ranging from pile driving to horizontal drilling. Current programs utilize the technique as a valuable tool for obtaining in situ, pristine environmental samples. In the future, this drilling technology could be used for remote, automated sampling at hazardous waste sites

  8. Borehole geophysical measurements for Hole UE25a-3, Nevada Test Site, Nuclear Waste Isolation Program

    International Nuclear Information System (INIS)

    Daniels, J.J.; Scott, J.H.

    1980-01-01

    Borehole geophysical measurements made in drill hole UE25a-3 with a US Geological Survey research well-logging truck are presented in this paper. The purpose of these logging measurements is to provide in-situ physical properties information that is not commercially available on drill hole UE25a-3. Well logs are presented in this paper for dual-detector density, normal resistivity, gamma-ray, neutron-neutron, induced polarization, and magnetic susceptibility measurements. These data are analyzed correlations with the core lithology. Hole-to-surface measurements made from drill hole UE25a-3 indicate the presence of two resistive bodies at depth. The deeper resistive anomaly may be related to a granitic intrusion

  9. Development of computational tool to interpret real time Pd (Pressure While Drilling) data; Desenvolvimento de ferramenta computacional interpretadora de dados de PWD (Pressure While Drilling) em tempo real

    Energy Technology Data Exchange (ETDEWEB)

    Gandelman, Roni Abensur; Waldmann, Alex Tadeu de Almeida; Martins, Andre Leibsohn [Centro de Pesquisas da Petrobras (CENPES). Gerencia de Tecnologia de Engenharia de Poco (Brazil)], e-mails: roniag@petrobras.com.br, awaldmann@petrobras.com.br, aleibsohn@petrobras.com.br; Teixeira, Gleber Tacio; Aragao, Atila Fernando Lima [E and P Servicos. Gerencia de Servicos de Poco (Brazil)], e-mail: gleber@petrobras.com.br, atila_aragao@petrobras.com.br; Rezende, Mauricio Seiji; Kern, Eduardo; Maliska Junior, Clovis [Engineering Simulation and Scientific Software (ESSS), (Brazil)], e-mails: mauricio@esss.com.br, kern@esss.com.br, coi@esss.com.br

    2008-12-15

    Drilling offshore oil wells is a very expensive and complex process, in which all the efforts must be taken to keep the annular pressure between a minimum pressure (pore pressure) and a maximum pressure (fracture pressure) which define the operational window limits. Several phenomena impact the bottom hole annular pressures, such as: ineffective hole cleaning, gel breaking when circulation is resumed, drill string movement (surge and swab), trips, pills displacement, kicks, etc. The correct interpretation of pressure while drilling (PWD) data is a very powerful toll to identify and prevent these phenomena. Nowadays, an expert monitors bottom hole pressures data and identifies undesirable events. The main goal of this project is the development of a computational tool to monitor pressure (and mud logging) data in real time to identify the causes of abnormal pressure variations, helping the operators to take decisions rapidly. Besides that, the tool allows the user to handle PWD data in a flexible architecture. This flexibility allows the incorporation of new methods of events identification as they are developed. The ultimate goals is to obtain a tool which serves both for the key study of the problems and physical, specific phenomena found during drilling, both for real-time monitoring to assist professionals involved in the process. (author)

  10. Drilling Predation on Serpulid Polychaetes (Ditrupa arietina) from the Pliocene of the Cope Basin, Murcia Region, Southeastern Spain

    Science.gov (United States)

    Martinell, Jordi; Kowalewski, Michał; Domènech, Rosa

    2012-01-01

    We report quantitative analyses of drilling predation on the free-living, tube-dwelling serpulid polychaete Ditrupa arietina from the Cope Cabo marine succession (Pliocene, Spain). Tubes of D. arietina are abundant in the sampled units: 9 bulk samples from 5 horizons yielded ∼5925 specimens of D. arietina. Except for fragmentation, tubes were well preserved. Complete specimens ranged from 3.1 to 13.4 mm in length and displayed allometric growth patterns, with larger specimens being relatively slimmer. Drilled Ditrupa tubes were observed in all samples. Drillholes, identified as Oichnus paraboloides, were characterized by circular to elliptical outline (drillhole eccentricity increased with its diameter), parabolic vertical profile, outer diameter larger than inner diameter, penetration of one tube wall only, narrow range of drill-hole sizes, and non-random (anterior) distribution of drillholes. A total of 233 drilled specimens were identified, with drilling frequencies varying across horizons from 2.7% to 21% (3.9% for pooled data). Many tube fragments were broken across a drillhole suggesting that the reported frequencies are conservative and that biologically-facilitated (drill-hole induced) fragmentation hampers fossil preservation of complete serpulid tubes. No failed or repaired holes were observed. Multiple complete drillholes were present (3.9%). Drilled specimens were significantly smaller than undrilled specimens and tube length and drill-hole diameter were weakly correlated. The results suggest that drillholes were produced by a size-selective, site-stereotypic predatory organism of unknown affinity. The qualitative and quantitative patterns reported here are mostly consistent with previous reports on recent and fossil Ditrupa and reveal parallels with drilling patterns documented for scaphopod mollusks, a group that is ecologically and morphologically similar to Ditrupa. Consistent with previous studies, the results suggest that free-dwelling serpulid

  11. Drilling of bone: A comprehensive review

    Science.gov (United States)

    Pandey, Rupesh Kumar; Panda, S.S.

    2013-01-01

    Background Bone fracture treatment usually involves restoring of the fractured parts to their initial position and immobilizing them until the healing takes place. Drilling of bone is common to produce hole for screw insertion to fix the fractured parts for immobilization. Orthopaedic drilling during surgical process causes increase in the bone temperature and forces which can cause osteonecrosis reducing the stability and strength of the fixation. Methods A comprehensive review of all the relevant investigations carried on bone drilling is conducted. The experimental method used, results obtained and the conclusions made by the various researchers are described and compared. Result Review suggests that the further improvement in the area of bone drilling is possible. The systematic review identified several consequential factors (drilling parameters and drill specifications) affecting bone drilling on which there no general agreement among investigators or are not adequately evaluated. These factors are highlighted and use of more advanced methods of drilling is accentuated. The use of more precise experimental set up which resembles the actual situation and the development of automated bone drilling system to minimize human error is addressed. Conclusion In this review, an attempt has been made to systematically organize the research investigations conducted on bone drilling. Methods of treatment of bone fracture, studies on the determination of the threshold for thermal osteonecrosis, studies on the parameters influencing bone drilling and methods of the temperature measurement used are reviewed and the future work for the further improvement of bone drilling process is highlighted. PMID:26403771

  12. Experimental Study on the Axis Line Deflection of Ti6A14V Titanium Alloy in Gun-Drilling Process

    Science.gov (United States)

    Li, Liang; Xue, Hu; Wu, Peng

    2018-01-01

    Titanium alloy is widely used in aerospace industry, but it is also a typical difficult-to-cut material. During Deep hole drilling of the shaft parts of a certain large aircraft, there are problems of bad surface roughness, chip control and axis deviation, so experiments on gun-drilling of Ti6A14V titanium alloy were carried out to measure the axis line deflection, diameter error and surface integrity, and the reasons of these errors were analyzed. Then, the optimized process parameter was obtained during gun-drilling of Ti6A14V titanium alloy with deep hole diameter of 17mm. Finally, we finished the deep hole drilling of 860mm while the comprehensive error is smaller than 0.2mm and the surface roughness is less than 1.6μm.

  13. AN EXPERIMENTAL STUDY OF CUTTING FLUID EFFECTS IN DRILLING. (R825370C057)

    Science.gov (United States)

    Experiments were designed and conducted on aluminum alloys and gray cast iron to determine the function of cutting fluid in drilling. The variables examined included speed, feed, hole depth, tool and workpiece material, cutting fluid condition, workpiece temperatures and drill...

  14. Data for four geologic test holes in the Sacramento Valley, California

    Science.gov (United States)

    Berkstresser, C.F.; French, J.J.; Schaal, M.E.

    1985-01-01

    The report provides geological and geophysical data for four of seven test holes drilled as a part of the Central Valley Aquifer Project, which is part of the Regional Aquifer Systems Analysis. The holes were drilled with a rotary well drilling machine to depths of 900 feet in the southwestern part of the Sacramento Valley in Solano and Yolo Counties. Geologic data for each well include lithology, texture, color, character of the contact, sorting, rounding, and cementation, determined from cuttings, cores, and sidewall covers. Fifty cores, 3 feet long, were obtained from each hole, and from eight to fourteen sidewall cores were collected. Geophysical data include a dual-induction log, spherically focused log (SFL), compensated neutron-formation density log, gamma-ray log, and a caliper log. These data are presented in four tables and on four plates. (USGS)

  15. Nondestructive continuous physical property measurements of core samples recovered from hole B, Taiwan Chelungpu-Fault Drilling Project

    Science.gov (United States)

    Hirono, Tetsuro; Yeh, En-Chao; Lin, Weiren; Sone, Hiroki; Mishima, Toshiaki; Soh, Wonn; Hashimoto, Yoshitaka; Matsubayashi, Osamu; Aoike, Kan; Ito, Hisao; Kinoshita, Masataka; Murayama, Masafumi; Song, Sheng-Rong; Ma, Kuo-Fong; Hung, Jih-Hao; Wang, Chien-Ying; Tsai, Yi-Ben; Kondo, Tomomi; Nishimura, Masahiro; Moriya, Soichi; Tanaka, Tomoyuki; Fujiki, Toru; Maeda, Lena; Muraki, Hiroaki; Kuramoto, Toshikatsu; Sugiyama, Kazuhiro; Sugawara, Toshikatsu

    2007-07-01

    The Taiwan Chelungpu-Fault Drilling Project was undertaken in 2002 to investigate the faulting mechanism of the 1999 Mw 7.6 Taiwan Chi-Chi earthquake. Hole B penetrated the Chelungpu fault, and core samples were recovered from between 948.42- and 1352.60-m depth. Three major zones, designated FZB1136 (fault zone at 1136-m depth in hole B), FZB1194, and FZB1243, were recognized in the core samples as active fault zones within the Chelungpu fault. Nondestructive continuous physical property measurements, conducted on all core samples, revealed that the three major fault zones were characterized by low gamma ray attenuation (GRA) densities and high magnetic susceptibilities. Extensive fracturing and cracks within the fault zones and/or loss of atoms with high atomic number, but not a measurement artifact, might have caused the low GRA densities, whereas the high magnetic susceptibility values might have resulted from the formation of magnetic minerals from paramagnetic minerals by frictional heating. Minor fault zones were characterized by low GRA densities and no change in magnetic susceptibility, and the latter may indicate that these minor zones experienced relatively low frictional heating. Magnetic susceptibility in a fault zone may be key to the determination that frictional heating occurred during an earthquake on the fault.

  16. New high-performance, water-based fluid benefits Santos basin operations with excellent inhibition and drilling efficiency

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Tom; West, Gary [Halliburton Baroid, Santos, SP (Brazil)

    2004-07-01

    For decades drilling fluids companies have been striving to create a water-based fluid (WBF) that yields performance similar to that of an invert emulsion in the areas of hole stability, rate of penetration (ROP) and lubricity. The HYDRO-GUARD system is a new highly inhibitive WBF that can yield drilling performance approaching that of an invert emulsion system. The new system uses a new combination of polymeric additives designed to inhibit reactive clays, minimize colloidal solids buildup, and produce a lubricious, gauge wellbore. This paper compares the field performance of the HYDRO-GUARD system on two recent Santos Basin wells drilled to over 5,000 m with the performance of synthetic-based fluids (SBF) used historically in the same area. Bottom hole temperatures (BHT) on these wells exceeded 315 deg F (157 deg C). Performance measures such as hole cleaning, penetration rates, hole stability, and torque and drag will be reviewed as well as general system benefits. (author)

  17. Unrecoverable bi-products of drilling titanium alloy and tantalum metal implants: a pilot study.

    Science.gov (United States)

    Skowronek, Paweł; Olszewski, Paweł; Święszkowski, Wojciech; Synder, Marek; Sibiński, Marcin; Mazek, Jacek

    2018-05-01

    Trabecular metal implants with a porous architecture that allows for the incorporation of bone into the implant during healing are gaining popularity in alloplastic revision procedures. The bi-products of drilling titanium alloy (Ti) and tantalum (Ta) implants have not been previously assessed. Four holes were drilled in each of two spatially porous trabecular implants, one Ta and the other Ti alloy (Ti-6Al-7Nb), for this pilot in vitro study. The particles were flushed out with a continuous flow of saline. The particles' weight and the volume were then measured using a Radwag XA 110/2X (USA) laboratory balance. The total volume of the obtained metal fines was measured by titration using a 10 mm 3 measurement system. A cobalt carbide bit was used since the holes could not be made with a standard bone drill. Each Ti and Ta implant lost 1.26 g and 2.48 g of mass, respectively. The volume of free particles recovered after each stage was 280 mm 3 and 149 mm 3 , respectively. Approximately 0.6% of the total implant mass was not recovered after drilling (roughly 2% of the mass of the particles created by drilling), despite the use of 5 µm filters. It is technically difficult to drill holes in Ti and Ta implants using standard surgical tools. The drilling process creates a considerable amount of metal particles, which cannot be recovered despite intensive flushing. This may have an adverse influence on the bio-functionality (survival) of the endoprosthesis and present deleterious systemic consequences.

  18. An evaluation of calculation procedures affecting the constituent factors of equivalent circulating density for drilling hydraulics

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, William J.

    1996-12-31

    This Dr. ing. thesis covers a study of drilling hydraulics offshore. The purpose of drilling hydraulics is to provide information about downhole pressure, suitable surface pump rates, the quality of hole cleaning and optimum tripping speeds during drilling operations. Main fields covered are drilling hydraulics, fluid characterisation, pressure losses, and equivalent circulating density. 197 refs., 23 figs., 22 tabs.

  19. An evaluation of calculation procedures affecting the constituent factors of equivalent circulating density for drilling hydraulics

    Energy Technology Data Exchange (ETDEWEB)

    Bailey, William J

    1997-12-31

    This Dr. ing. thesis covers a study of drilling hydraulics offshore. The purpose of drilling hydraulics is to provide information about downhole pressure, suitable surface pump rates, the quality of hole cleaning and optimum tripping speeds during drilling operations. Main fields covered are drilling hydraulics, fluid characterisation, pressure losses, and equivalent circulating density. 197 refs., 23 figs., 22 tabs.

  20. Weld residual stresses near the bimetallic interface in clad RPV steel: A comparison between deep-hole drilling and neutron diffraction data

    Energy Technology Data Exchange (ETDEWEB)

    James, M.N., E-mail: mjames@plymouth.ac.uk [School of Marine Science and Engineering, University of Plymouth, Drake Circus, Plymouth (United Kingdom); Department of Mechanical Engineering, Nelson Mandela Metropolitan University, Port Elizabeth (South Africa); Newby, M.; Doubell, P. [Eskom Holdings SOC Ltd, Lower Germiston Road, Rosherville, Johannesburg (South Africa); Hattingh, D.G. [Department of Mechanical Engineering, Nelson Mandela Metropolitan University, Port Elizabeth (South Africa); Serasli, K.; Smith, D.J. [Department of Mechanical Engineering, University of Bristol, Queen' s Building, University Walk, Bristol (United Kingdom)

    2014-07-01

    Highlights: • Identification of residual stress trends across bimetallic interface in stainless clad RPV. • Comparison between deep hole drilling (DHD – stress components in two directions) and neutron diffraction (ND – stress components in three directions). • Results indicate that both techniques can assess the trends in residual stress across the interface. • Neutron diffraction gives more detailed information on transient residual stress peaks. - Abstract: The inner surface of ferritic steel reactor pressure vessels (RPV) is clad with strip welded austenitic stainless steel primarily to increase the long-term corrosion resistance of the ferritic vessel. The strip welding process used in the cladding operation induces significant residual stresses in the clad layer and in the RPV steel substrate, arising both from the thermal cycle and from the very different thermal and mechanical properties of the austenitic clad layer and the ferritic RPV steel. This work measures residual stresses using the deep hole drilling (DHD) and neutron diffraction (ND) techniques and compares residual stress data obtained by the two methods in a stainless clad coupon of A533B Class 2 steel. The results give confidence that both techniques are capable of assessing the trends in residual stresses, and their magnitudes. Significant differences are that the ND data shows greater values of the tensile stress peaks (∼100 MPa) than the DHD data but has a higher systematic error associated with it. The stress peaks are sharper with the ND technique and also differ in spatial position by around 1 mm compared with the DHD technique.

  1. Weld residual stresses near the bimetallic interface in clad RPV steel: A comparison between deep-hole drilling and neutron diffraction data

    International Nuclear Information System (INIS)

    James, M.N.; Newby, M.; Doubell, P.; Hattingh, D.G.; Serasli, K.; Smith, D.J.

    2014-01-01

    Highlights: • Identification of residual stress trends across bimetallic interface in stainless clad RPV. • Comparison between deep hole drilling (DHD – stress components in two directions) and neutron diffraction (ND – stress components in three directions). • Results indicate that both techniques can assess the trends in residual stress across the interface. • Neutron diffraction gives more detailed information on transient residual stress peaks. - Abstract: The inner surface of ferritic steel reactor pressure vessels (RPV) is clad with strip welded austenitic stainless steel primarily to increase the long-term corrosion resistance of the ferritic vessel. The strip welding process used in the cladding operation induces significant residual stresses in the clad layer and in the RPV steel substrate, arising both from the thermal cycle and from the very different thermal and mechanical properties of the austenitic clad layer and the ferritic RPV steel. This work measures residual stresses using the deep hole drilling (DHD) and neutron diffraction (ND) techniques and compares residual stress data obtained by the two methods in a stainless clad coupon of A533B Class 2 steel. The results give confidence that both techniques are capable of assessing the trends in residual stresses, and their magnitudes. Significant differences are that the ND data shows greater values of the tensile stress peaks (∼100 MPa) than the DHD data but has a higher systematic error associated with it. The stress peaks are sharper with the ND technique and also differ in spatial position by around 1 mm compared with the DHD technique

  2. Aerated drilling cutting transport analysis in geothermal well

    Science.gov (United States)

    Wakhyudin, Aris; Setiawan, Deni; Dwi Marjuan, Oscar

    2017-12-01

    Aeratad drilling widely used for geothermal drilling especially when drilled into predicted production zone. Aerated drilling give better performance on preventing lost circulation problem, improving rate of penetration, and avoiding drilling fluid invasion to productive zone. While well is drilled, cutting is produced and should be carried to surface by drilling fluid. Hole problem, especially pipe sticking will occur while the cutting is not lifted properly to surface. The problem will effect on drilling schedule; non-productive time finally result more cost to be spent. Geothermal formation has different characteristic comparing oil and gas formation. Geothermal mainly has igneous rock while oil and gas mostly sedimentary rock. In same depth, formation pressure in geothermal well commonly lower than oil and gas well while formation temperature geothermal well is higher. While aerated drilling is applied in geothermal well, Igneous rock density has higher density than sedimentary rock and aerated drilling fluid is lighter than water based mud hence minimum velocity requirement to transport cutting is larger than in oil/gas well drilling. Temperature and pressure also has impact on drilling fluid (aerated) density. High temperature in geothermal well decrease drilling fluid density hence the effect of pressure and temperature also considered. In this paper, Aerated drilling cutting transport performance on geothermal well will be analysed due to different rock and drilling fluid density. Additionally, temperature and pressure effect on drilling fluid density also presented to merge.

  3. Dewatering cuts drilling mud and disposal costs

    International Nuclear Information System (INIS)

    West, G.; Pharis, B.

    1991-01-01

    This paper reports on rig site dewatering of drilling fluids with recycling of processed water that can help an operator to comply with environmental rules by reducing volumes of waste and reducing long term liabilities. It can also reduce disposal costs and provide a cleaner drill site overall. Rig site dewatering is the process of injecting coagulants or flocculating chemicals into the mud entering a large clarifying centrifuge. This coagulates the fine, drilled particles allowing them to be separated from the fluid which can then be handled separately. Most of the environmental concerns during the 1980s involved hazardous materials and toxic wastes. Drilling fluids, many of which are chemically benign, have escaped many of the difficult-to-comply-with rules and regulations. During the 1990s, however, operators may be required to submit a written plan for liquid waste reduction for even nonhazardous materials. Many states and local agencies may institute total bans on oil field wastes. Drilling rigs typically produce about 1 bbl of liquid waste for every 1 ft of hole drilled. Thus, a typical drilling operation can produce a large quantity of waste

  4. X-ray Fluorescence Core Scanning of Oman Drilling Project Holes BT1B and GT3A Cores on D/V CHIKYU

    Science.gov (United States)

    Johnson, K. T. M.; Kelemen, P. B.; Michibayashi, K.; Greenberger, R. N.; Koepke, J.; Beinlich, A.; Morishita, T.; Jesus, A. P. M.; Lefay, R.

    2017-12-01

    The JEOL JSX-3600CA1 energy dispersive X-ray fluorescence core logger (XRF-CL) on the D/V Chikyu provides quantitative element concentrations of scanned cores. Scans of selected intervals are made on an x-y grid with point spacing of 5 mm. Element concentrations for Si, Al, Ti, Ca, Mg, Mn, Fe, Na, K, Cr, Ni, S and Zn are collected for each point on the grid. Accuracy of element concentrations provided by the instrument software is improved by applying empirical correction algorithms. Element concentrations were collected for 9,289 points from twenty-seven core intervals in Hole BT1B (basal thrust) and for 6,389 points from forty core intervals in Hole GT3A (sheeted dike-gabbro transition) of the Oman Drilling Project on the D/V Chikyu XRF-CL during Leg 2 of the Oman Drilling Project in August-September, 2017. The geochemical data are used for evaluating downhole compositional details associated with lithological changes, unit contacts and mineralogical variations and are particularly informative when plotted as concentration contour maps or downhole concentration diagrams. On Leg 2 additional core scans were made with X-ray Computed Tomography (X-ray CT) and infrared images from the visible-shortwave infrared imaging spectroscopy (IR) systems on board. XRF-CL, X-ray CT and IR imaging plots used together provide detailed information on rock compositions, textures and mineralogy that assist naked eye visual observations. Examples of some uses of XRF-CL geochemical maps and downhole data are shown. XRF-CL and IR scans of listvenite clearly show zones of magnesite, dolomite and the Cr-rich mica, fuchsite that are subdued in visual observation, and these scans can be used to calculate variations in proportions of these minerals in Hole BT1B cores. In Hole GT3A XRF-CL data can be used to distinguish compositional changes in different generations of sheeted dikes and gabbros and when combined with visual observations of intrusive relationships the detailed geochemical

  5. Problem analysis of geotechnical well drilling in complex environment

    International Nuclear Information System (INIS)

    Kasenov, A K; Biletskiy, M T; Ratov, B T; Korotchenko, T V

    2015-01-01

    The article examines primary causes of problems occurring during the drilling of geotechnical wells (injection, production and monitoring wells) for in-situ leaching to extract uranium in South Kazakhstan. Such a drilling problem as hole caving which is basically caused by various chemical and physical factors (hydraulic, mechanical, etc.) has been thoroughly investigated. The analysis of packing causes has revealed that this problem usually occurs because of insufficient amount of drilling mud being associated with small cross section downward flow and relatively large cross section upward flow. This is explained by the fact that when spear bores are used to drill clay rocks, cutting size is usually rather big and there is a risk for clay particles to coagulate

  6. Avoiding pollution in scientific ocean drilling

    International Nuclear Information System (INIS)

    Francis, T.J.G.

    1999-01-01

    Scientific ocean drilling has been carried out in the world's oceans since the nineteen sixties. From 1968-83 the Deep Sea Drilling Project (DSDP), managed by the Scripps Institution of Oceanography in California under a contract with the US National Science Foundation, employed the drilling vessel Glomar Challenger for this purpose. In January 1985 the Ocean Drilling Program (GDP), operated by Texas A and M University, began operations with the drillship JOIDES Resolution which continue to this day. The principal funding agency remains the US National Science Foundation, but since its inception GDP has been an international program and currently receives financial support from 21 countries. The ODP operates globally and, as with DSDP before it, drills without a riser or blowout preventer in a wide range of geological environments. Water depths at GDP drill sites have ranged from 38 m to 5969 m, but are typically within the range 1000-5000 m. Depths of penetration at GDP drill sites, while generally less than 1000 m, have ranged up to 2111 m below the sea floor. The drilling fluid is seawater, although occasional slugs of mud are circulated to clean or condition the hole. Thus drilling is carried out without well control, i.e. without the ability to control pressures within the well. Because of the absence of well control, it is vital to ensure that the drillship does not drill into an accumulation of oil or gas. Drilling into a charged reservoir and causing oil or gas to escape into the marine environment is recognised as the main pollution hazard in scientific ocean drilling

  7. Reducing forces during drilling brittle hard materials by using ultrasonic and variation of coolant

    Science.gov (United States)

    Schopf, C.; Rascher, R.

    2016-11-01

    The process of ultrasonic machining is especially used for brittle hard materials as the additional ultrasonic vibration of the tool at high frequencies and low amplitudes acts like a hammer on the surface. With this technology it is possible to drill holes with lower forces, therefor the machining can be done faster and the worktime is much less than conventionally. A three-axis dynamometer was used to measure the forces, which act between the tool and the sample part. A focus is set on the sharpness of the tool. The results of a test series are based on the Sauer Ultrasonic Grinding Centre. On the same machine it is possible to drill holes in the conventional way. Additional to the ultasonic Input the type an concentration of coolant is important for the Drilling-force. In the test there were three different coolant and three different concentrations tested. The combination of ultrasonic vibration and the right coolant and concentration is the best way to reduce the Forces. Another positive effect is, that lower drilling-forces produce smaller chipping on the edge of the hole. The way to reduce the forces and chipping is the main issue of this paper.

  8. Development of controlled drilling technology and measurement method in the borehole (Phase 1)

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Shin, Koichi; Suzuki, Koichi; Miyakawa, Kimio; Okada, Tetsuji; Masuhara, Yasunobu; Igeta, Noriyuki; Kobayakawa, Hiroaki; Yamamoto, Shinya

    2006-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for High Level Waste (HLW) disposal. Especially, the soft sedimentary rock at the coastal area is thought to be one of the best candidates, since there is little driving force of the underground water. The measurement and logging of the bore hole in order to investigate the hydro-geological and geo-mechanical conditions of the host rock is a very important way to examine the potential of the disposal candidates. Central Research Institute of Electric Power Industry (CRIEPI) has been conducting the project on controlled drilling and the logging/measurement technologies in its boreholes. The key technologies of the project were defined as follows; (1) Drilling technology to bent the hole as intend. (2) Locality detection technology of the drill bit (MWD). (3) Core sampling technology to obtain the undisturbed rock core. (4) Logging and measurement technology during drilling. The drilling system and measuring system were integrated and systemized after each apparatus was manufactured and its performance was checked. The performance of the drilling system was checked to drill the artificial rock mass to the depth of 80 m before conducting in-situ drilling. The performance of the drilling and measurement systems were investigated to drill the mudstone of the Neogene Tertiary to the length of 547 m and to conduct the downhole measurement and logging in its borehole at the Horonobe site. Considering these performance testing, the flow diagram of the controlled drilling and measurement system was established. (author)

  9. Petrologic studies of drill cores USW-G2 and UE25b-1H, Yucca Mountain, Nevada

    International Nuclear Information System (INIS)

    Caporuscio, F.; Vaniman, D.; Bish, D.; Broxton, D.; Arney, B.; Heiken, G.; Byers, F.; Gooley, R.; Semarge, E.

    1982-07-01

    The tuffs of the Nevada Test Site are currently under investigation as a possible deep geologic site for high-level radioactive waste disposal. This report characterizes tuff retrieved in core from two drill holes, USW-G2 and UE25b-1H, at the Yucca Mountain block. The USW-G2 drill core is from the northernmost extent of the block, whereas UE25b-1H is adjacent to an earlier drill hole, UE25a-1. The drill cores USW-G2 and UE25b-1H bottomed at 6000 and 4200 ft, respectively. Petrographic and x-ray diffraction studies of the two drill cores are presented in this report and indicate that tuffs (composed primarily of variably welded ash flows) are partially recrystallized to secondary minerals. Correlations of stratigraphy are also made with previous drill cores from Yucca Mountain

  10. Analysis of residual stresses on the transverse beam of a casting stand by means of drilling method

    Directory of Open Access Journals (Sweden)

    P. Frankovský

    2014-10-01

    Full Text Available The presented paper demonstrates the application of drilling method in the analysis of residual stresses on the transverse beam of a casting stand. In the initial stage of the analysis the determination of strains was done for individual steps of drilling in the area which was determined by means of numerical analysis. The drilling was carried out gradually by 0,5 mm up to the depth of 5 mm, while the diameter of the drilled hole was 3,2 mm. During the analysis we used the drilling device RS-200, strain indicator P3 and SGD 1-RY21-3/120. The paper presents the development of residual stresses throughout the depth of the drilled hole which were determined according to standard ASTM E837-01, by means of integral method, power series method and by means of Power Series method.

  11. The Brimmond Reservoir extending the Forties Field into the millenium by maximizing profits without extensive rig upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Smith, L.; Perras, L. [Noble Drilling (United Kingdom)

    1998-12-31

    Drilling a horizontal well with a minimum facilities workover rig in the Brimmond Field (North Sea) which overlies the Forties Reservoir, was described. Feasibility studies indicated that further development of the Brimmond Field would require extensive rig upgrade to be able to drill the horizontal well within recognized industry parameters. Since the upgrading of the drilling package would have delayed the project by several months, as well as making it uneconomical, a number of critical operations were identified and analyzed, which led to introducing `new technology` - premixed cement, leading edge LWD tools and hole cleanup techniques. The first horizontal sidetrack was successfully completed with the minimum facilities drilling package and production commenced at an initial rate of 2.4 mbd dry oil from a 13 ft cased hole gravel pack utilizing an existing Forties Field producing well. The original Paleocene interval was abandoned with cement plugs prior to milling a window on the 9-5/8 inch casing and installing a gravel pack. Steady production of this new well led to consideration of further development of the field. 4 figs.

  12. ResonantSonic drilling: History, progress and advances in environmental restoration programs

    International Nuclear Information System (INIS)

    Volk, B.W.; McLellan, G.W.; Moak, D.J.; Lerch, R.E.; Thompson, K.M.; Barrow, J.C.

    1993-01-01

    ResonantSonic SM drilling is being used in the environmental industry to drill faster, cheaper, and safer than conventional drilling methodologies. ResonantSonic is a registered service mark of the Water Development Corporation, Woodland, California. The ResonantSonic drilling method, requires no mud, air or water for rapid penetration through geologic materials ranging from rock and clay to sand and boulders. The specialized drill head imparts high frequency vibrations into a steel drill pipe creating a drilling action which allows the retrieval of continuous, undisturbed cores. An added benefit is that the method can be used for angle drilling. The ReasonantSonic method has been used in the past for projects ranging from pile driving to horizontal drilling. Current programs are utilizing the technique as a valuable tool for obtaining in situ, pristine environmental samples. In the future, this drilling technology could be used for remote, automated sampling at hazardous waste sites

  13. Equipment for deployment of canisters with spent nuclear fuel and bentonite buffer in horizontal holes

    International Nuclear Information System (INIS)

    Henttonen, V.; Suikki, M.

    1992-08-01

    The study presents the predesign of equipment for the deployment of canisters in long horizontal holes. The canisters are placed in the centre of the hole and are surrounded by a bentonite buffer. In thE study the canisters are assumed to have a diameter of 1.6 m and a length of 5.9 m, including the hemispherical ends. Their total weight is 60 tonnes. The bentonite buffer after homogenization is 400 mm thick, making a total package diameter of 2.4 m. The deployment system consists of four wagons for handling The canisters and the bentonite blocks. To ensure safe emplacement, every part is installed separately in its final position. This also makes it possible to use small clearances between the canisters and the bentonite blocks and between the blocks and the rock wall. With small clearances, backfilling can be avoided. Another basic design idea is that the wagons are equipped with wheels, which are in direct contact with the rock walls. Thus, rails, which have to be removed as the deployment progresses, are unnecessary. To minimize the time taken for deploying one canister, the wagons are designed so that only three trips from the service area to the deposit area are needed. Due to the radiation in the vicinity of the canisters, the wagons have to be teleoperated

  14. Potential environmental benefits from regulatory consideration of synthetic drilling muds

    International Nuclear Information System (INIS)

    Burke, C.J.; Veil, J.A.

    1995-02-01

    When drilling exploration and production wells for oil and gas, drillers use specialized drilling fluids, referred to as muds, to help maintain well control and to remove drill cuttings from the hole. Historically, either water-based muds (WBMs) or oil-based muds (OBMs) have been used for offshore wells. Recently, in response to US Environmental Protection Agency (EPA) regulations and drilling-waste discharge requirements imposed by North Sea nations, the drilling industry has developed several types of synthetic-based muds (SBMs) that combine the desirable operating qualities of OBMs with the lower toxicity and environmental impact qualities of WBMs. This report describes the operational, environmental, and economic features of all three types of muds and discusses potential EPA regulatory barriers to wider use of SBMs

  15. Delamination measurement of a laminates composite panel due to hole punching based on the focus variation technique

    Science.gov (United States)

    Abdullah, A. B.; Zain, M. S. M.; Abdullah, M. S.; Samad, Z.

    2017-07-01

    Structural materials, such as composite panels, must be assembled, and such panels are typically constructed via the insertion of a fastener through a drilled hole. The main problem encountered in drilling is delamination, which affects assembly strength. The cost of drilling is also high because of the severe wear on drill bits. The main goal of this research is to develop a new punching method as an alternative to drilling during hole preparation. In this study, the main objective is to investigate the effect of different puncher profiles on the quality of holes punched into carbon fiber reinforcement polymer (CFRP) composite panels. Six types of puncher profiles were fabricated with minimum die clearance (1%), and two quality aspects, namely, incomplete shearing and delamination factor, were measured. The conical puncher incurred the least defects in terms of delamination and yielded an acceptable amount of incomplete shearing in comparison with the other punchers.

  16. Quantifying performance on an outdoor agility drill using foot-mounted inertial measurement units.

    Directory of Open Access Journals (Sweden)

    Antonia M Zaferiou

    Full Text Available Running agility is required for many sports and other physical tasks that demand rapid changes in body direction. Quantifying agility skill remains a challenge because measuring rapid changes of direction and quantifying agility skill from those measurements are difficult to do in ways that replicate real task/game play situations. The objectives of this study were to define and to measure agility performance for a (five-cone agility drill used within a military obstacle course using data harvested from two foot-mounted inertial measurement units (IMUs. Thirty-two recreational athletes ran an agility drill while wearing two IMUs secured to the tops of their athletic shoes. The recorded acceleration and angular rates yield estimates of the trajectories, velocities and accelerations of both feet as well as an estimate of the horizontal velocity of the body mass center. Four agility performance metrics were proposed and studied including: 1 agility drill time, 2 horizontal body speed, 3 foot trajectory turning radius, and 4 tangential body acceleration. Additionally, the average horizontal ground reaction during each footfall was estimated. We hypothesized that shorter agility drill performance time would be observed with small turning radii and large tangential acceleration ranges and body speeds. Kruskal-Wallis and mean rank post-hoc statistical analyses revealed that shorter agility drill performance times were observed with smaller turning radii and larger tangential acceleration ranges and body speeds, as hypothesized. Moreover, measurements revealed the strategies that distinguish high versus low performers. Relative to low performers, high performers used sharper turns, larger changes in body speed (larger tangential acceleration ranges, and shorter duration footfalls that generated larger horizontal ground reactions during the turn phases. Overall, this study advances the use of foot-mounted IMUs to quantify agility performance in

  17. Analysis of residual transverse stresses in a thick UD glass/polyester pultruded profile using hole drilling with strain gage and digital image correlation

    Science.gov (United States)

    Yuksel, Onur; Baran, Ismet; Ersoy, Nuri; Akkerman, Remko

    2018-05-01

    Process induced stresses inherently exist in fiber reinforced polymer composites particularly in thick parts due to the presence of non-uniform cure, shrinkage and thermal expansion/contraction during manufacturing. In order to increase the reliability and the performance of the composite materials, process models are developed to predict the residual stress formation. The accuracy of the process models is dependent on the geometrical (micro to macro), material and process parameters as well as the numerical implementation. Therefore, in order to have reliable process modelling framework, there is a need for validation and if necessary calibration of the developed models. This study focuses on measurement of the transverse residual stresses in a relatively thick pultruded profile (20×20 mm) made of glass/polyester. Process-induced residual stresses in the middle of the profile are examined with different techniques which have never been applied for transverse residual stresses in thick unidirectional composites. Hole drilling method with strain gage and digital image correlation are employed. Strain values measured from measurements are used in a finite element model (FEM) to simulate the hole drilling process and predict the residual stress level. The measured released strain is found to be approximately 180 μm/m from the strain gage. The tensile residual stress at the core of the profile is estimated approximately as 7-10 MPa. Proposed methods and measured values in this study will enable validation and calibration of the process models based on the residual stresses.

  18. Color View of a 'Rat' Hole Trail Inside 'Endurance'

    Science.gov (United States)

    2004-01-01

    This view from the Mars Exploration Rover Opportunity's panoramic camera is an approximately true color rendering of the first seven holes that the rover's rock abrasion tool dug on the inner slope of 'Endurance Crater.' The rover was about 12 meters (about 39 feet) down into the crater when it acquired the images combined into this mosaic. The view is looking back toward the rim of the crater, with the rover's tracks visible. The tailings around the holes drilled by the rock abrasion tool, or 'Rat,' show evidence for fine-grained red hematite similar to what was observed months earlier in 'Eagle Crater' outcrop holes. Starting from the uppermost pictured (closest to the crater rim) to the lowest, the rock abrasion tool hole targets are called 'Tennessee,' 'Cobblehill,' 'Virginia,' 'London,' 'Grindstone,' 'Kettlestone,' and 'Drammensfjorden.' Opportunity drilled these holes on sols 138 (June 13, 2004), 143 (June 18), 145 (June 20), 148 (June 23), 151 (June 26), 153 (June 28) and 161 (July 7), respectively. Each hole is 4.5 centimeters (1.8 inches) in diameter. This image was generated using the panoramic camera's 750-, 530-, and 430-nanometer filters. It was taken on sol 173 (July 19).

  19. Analysis of geophysical well logs from the Mariano Lake-Lake Valley drilling project, San Juan Basin, Northwestern New Mexico

    International Nuclear Information System (INIS)

    Scott, J.H.

    1986-01-01

    Geophysical well logs were obtained in eight deep holes drilled and cored by the U.S. Geological Survey to examine the geology of the Mariano Lake-Lake Valley area in the southern part of the San Juan basin, New Mexico. The logs were made to determine the petrophysical properties of the rocks penetrated by the holes, to aid in making stratigraphic correlations between the holes, and to estimate the grade of uranium enrichment in mineralized zones. The logs can be divided into six categories-nuclear, electric, sonic, magnetic, dipmeter, and borehole conditions. Examples of these logs are presented and related to lithological and petrophysical properties of the cores recovered. Gamma-ray and prompt fission neutron logs were used to estimate uranium grade in mineralized zones. Resistivity and spontaneous potential logs were used to make stratigraphic correlations between drill holes and to determine the variability of the sandstone:mudstone ratios of the major sedimentary units. In one drill hole a dipmeter log was used to estimate the direction of sediment transport of the fluvial host rock. Magnetic susceptibility logs provided supportive information for a laboratory study of magnetic mineral alteration in drill cores. This study was used to infer the geochemical and hydrologic environment associated with uranium deposition in the project area

  20. Conceptual design of modular fixture for frame welding and drilling process integration case study: Student chair in UNS industrial engineering integrated practicum

    Science.gov (United States)

    Darmawan, Tofiq Dwiki; Priadythama, Ilham; Herdiman, Lobes

    2018-02-01

    Welding and drilling are main processes of making chair frame from metal material. Commonly, chair frame construction includes many arcs which bring difficulties for its welding and drilling process. In UNS industrial engineering integrated practicum there are welding fixtures which use to fixing frame component position for welding purpose. In order to achieve exact holes position for assembling purpose, manual drilling processes were conducted after the frame was joined. Unfortunately, after it was welded the frame material become hard and increase drilling tools wear rate as well as reduce holes position accuracy. The previous welding fixture was not equipped with clamping system and cannot accommodate drilling process. To solve this problem, our idea is to reorder the drilling process so that it can be execute before welding. Thus, this research aims to propose conceptual design of modular fixture which can integrate welding and drilling process. We used Generic Product Development Process to address the design concept. We collected design requirements from 3 source, jig and fixture theoretical concepts, user requirements, and clamping part standards. From 2 alternatives fixture tables, we propose the first which equipped with mounting slots instead of holes. We test the concept by building a full sized prototype and test its works by conducting welding and drilling of a student chair frame. Result from the welding and drilling trials showed that the holes are on precise position after welding. Based on this result, we conclude that the concept can be a consideration for application in UNS Industrial Engineering Integrated Practicum.

  1. NNWSI [Nevada Nuclear Waste Storage Investigations] hole history, UE-25b No. 1

    International Nuclear Information System (INIS)

    1986-11-01

    This report is a compilation of data from UE-25b No. 1 drilled in Area 25 under the guidance of the US Geological Survey. It was drilled to provide geologic and hydrologic information for the Yucca Mountain area. Data presented in this document include the hole history, geophysical log and video tape listings, and microfiche copies of all geophysical logs run in hole by Fenix and Scisson, Inc. subcontractor

  2. Physical properties of uranium host rocks and experimental drilling at Long Park, Montrose County, Colorado. Final report

    International Nuclear Information System (INIS)

    Manger, G.E.; Gates, G.L.; Cadigan, R.A.

    1975-01-01

    A core-drilling study in uranium host rocks of the Jurassic Morrison Formation in southwestern Colorado attempted to obtain samples of host rock in its natural state. Three holes were drilled, holes and core were logged for radioactivity and electrical properties. Samples were analyzed for physical and chemical properties. Drilling results suggest that drilling with dried air yields core with least contamination at least cost. Drilling with oil results in maximum core recovery but also maximum cost and significant core contamination. Drilling with water results in contamination and loss of original pore water. A factor group of variables present are: Those positively related to uranium mineralization are poor sorting, percent by weight clay, percent of pore space containing water; negatively related variables are median grain size (mm), electrical resistivity, permeability. Optimum depth to locate ore seems to be at the top of the pore water capillary circulation zone, below the dehydrated no-capillary-circulation zone

  3. Development and Manufacture of Cost-Effective Composite Drill Pipe

    Energy Technology Data Exchange (ETDEWEB)

    James C. Leslie

    2008-12-31

    Advanced Composite Products and Technology, Inc. (ACPT) has developed composite drill pipe (CDP) that matches the structural and strength properties of steel drill pipe, but weighs less than 50 percent of its steel counterpart. Funding for the multiyear research and development of CDP was provided by the U.S. Department of Energy Office of Fossil Energy through the Natural Gas and Oil Projects Management Division at the National Energy Technology Laboratory (NETL). Composite materials made of carbon fibers and epoxy resin offer mechanical properties comparable to steel at less than half the weight. Composite drill pipe consists of a composite material tube with standard drill pipe steel box and pin connections. Unlike metal drill pipe, composite drill pipe can be easily designed, ordered, and produced to meet specific requirements for specific applications. Because it uses standard joint connectors, CDP can be used in lieu of any part of or for the entire steel drill pipe section. For low curvature extended reach, deep directional drilling, or ultra deep onshore or offshore drilling, the increased strength to weight ratio of CDP will increase the limits in all three drilling applications. Deceased weight will reduce hauling costs and increase the amount of drill pipe allowed on offshore platforms. In extreme extended reach areas and high-angle directional drilling, drilling limits are associated with both high angle (fatigue) and frictional effects resulting from the combination of high angle curvature and/or total weight. The radius of curvature for a hole as small as 40 feet (12.2 meters) or a build rate of 140 degrees per 100 feet is within the fatigue limits of specially designed CDP. Other properties that can be incorporated into the design and manufacture of composite drill pipe and make it attractive for specific applications are corrosion resistance, non-magnetic intervals, and abrasion resistance coatings. Since CDP has little or no electromagnetic force

  4. Pushing the limits : from better bits to faster coil, companies leverage technology to ramp up onshore drilling performance

    Energy Technology Data Exchange (ETDEWEB)

    Smith, M.

    2009-06-15

    Horizontal drilling and drilling with coiled tubing are two well drilling techniques that have steadily gained ground in the drilling industry. Most of the techniques evolved in western Canada and Alaska, but are now being successfully used south of the border. This article discussed the leveraging of technology by drilling companies in order to ramp up onshore drilling performance. Calgary-based Xtreme Coil Drilling Corp. leveraged its unique coil over top drive rigs in order to score more speed records and set new marks in both the United States Rockies and Mexico. This article also referred to other companies and their wells that have set records, including CNX Gas Corporation and the Marcellus Shale prospect; Smith International and its horizontal turbodrilling of a Pennsylvanian reservoir; and Baker Oil Tools' new rotating, self-aligning multilateral (RAM) system. For each of these examples, the article described the technology and the challenges encountered by the companies as well as the objectives of the project, and results of the drilling efforts. 2 figs.

  5. Fifty Years of Soviet and Russian Drilling Activity in Polar and Non-Polar Ice: A Chronological History

    Science.gov (United States)

    2007-10-01

    cable being separated from the drill, and further drilling ceased. The drilling operation consisted of three men working one shift. They achieved a...thickness is 160–180 m according to radio-echo sounding data. A 93-m-deep hole was drilled by two men over 127 hours (the total penetration time of...TR-07-20 89 Figure 31. KEMS-112 electro-mechanical core drill: (1) drill head, (2) core barrel, (3) nipple , (4) barrel, (5) chip filter, (6

  6. Heterogeneous Shallow-Shelf Carbonate Buildups in the Paradox Basin, Utah and Colorado: Targets for Increased Oil Production and Reserves Using Horizontal Drilling Techniques

    Energy Technology Data Exchange (ETDEWEB)

    Thomas C. Chidsey; Kevin McClure; Craig D. Morgan

    2003-10-05

    The Paradox Basin of Utah, Colorado, Arizona, and New Mexico contains nearly 100 small oil fields producing from carbonate buildups within the Pennsylvanian (Desmoinesian) Paradox Formation. These fields typically have one to 10 wells with primary production ranging from 700,000 to 2,000,000 barrels (111,300-318,000 m{sup 3}) of oil per field and a 15 to 20 percent recovery rate. At least 200 million barrels (31.8 million m{sup 3}) of oil will not be recovered from these small fields because of inefficient recovery practices and undrained heterogeneous reservoirs. Several fields in southeastern Utah and southwestern Colorado are being evaluated as candidates for horizontal drilling and enhanced oil recovery from existing vertical wells based upon geological characterization and reservoir modeling case studies. Geological characterization on a local scale is focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible reservoir compartmentalization, within these fields. This study utilizes representative cores, geophysical logs, and thin sections to characterize and grade each field's potential for drilling horizontal laterals from existing development wells. The results of these studies can be applied to similar fields elsewhere in the Paradox Basin and the Rocky Mountain region, the Michigan and Illinois Basins, and the Midcontinent region. This report covers research activities for the first half of the fourth project year (April 6 through October 5, 2003). The work included (1) analysis of well-test data and oil production from Cherokee and Bug fields, San Juan County, Utah, and (2) diagenetic evaluation of stable isotopes from the upper Ismay and lower Desert Creek zones of the Paradox Formation in the Blanding sub-basin, Utah. Production ''sweet spots'' and potential horizontal drilling candidates were identified for Cherokee and Bug fields. In Cherokee field, the most productive wells are located in the

  7. Temperature measurements in small holes drilled in superconducting bulk during pulsed field magnetization

    Science.gov (United States)

    Fujishiro, H.; Naito, T.; Furuta, D.; Kakehata, K.

    2010-11-01

    The time dependence of the temperatures T(z, t) has been measured along the thickness direction z in several drilled holes in a superconducting bulk during pulsed field magnetization (PFM) and the heat generation and heat transfer in the bulk have been discussed. In the previous paper [H. Fujishiro, S. Kawaguchi, K. Kakehata, A. Fujiwara, T. Tateiwa, T. Oka, Supercond. Sci. Technol. 19 (2006) S540], we calculated the T(z, t) profiles in the bulk by solving a three-dimensional heat-diffusion equation to reproduce the measured T(t) on the bulk surface; the heat generation took place adiabatically and the calculated T(z, t) was isothermal along the z direction. In this study, the measured T(z, t) at the top surface was higher than that at the bottom surface just after the pulse field application at t < 0.5 s, and then became isothermal with increasing time. These results suggest that the magnetic flux intrudes inhomogeneously into the bulk from the edge of the top surface and the periphery at the early stage. The inhomogeneous magnetic flux intrusion and the flux trap during PFM change depending on the strength of the pulsed field and the pulse number in the successive pulse field application.

  8. Recovery and Lithologic Analysis of Sediment from Hole UT-GOM2-1-H002, Green Canyon 955, Northern Gulf of Mexico

    Science.gov (United States)

    Kinash, N.; Cook, A.; Sawyer, D.; Heber, R.

    2017-12-01

    In May 2017 the University of Texas led a drilling and pressure coring expedition in the northern Gulf of Mexico, UT-GOM2-01. The holes were located in Green Canyon Block 955, where the Gulf of Mexico Joint Industry Project Leg II identified an approximately 100m thick hydrate-filled course-grained levee unit in 2009. Two separate wells were drilled into this unit: Holes H002 and H005. In Hole H002, a cutting shoe drill bit was used to collect the pressure cores, and only 1 of the 8 cores collected was pressurized during recovery. The core recovery in Hole H002 was generally poor, about 34%, while the only pressurized core had 45% recovery. In Hole H005, a face bit was used during pressure coring where 13 cores were collected and 9 cores remained pressurized. Core recovery in Hole H005 was much higher, at about 75%. The type of bit was not the only difference between the holes, however. Drilling mud was used throughout the drilling and pressure coring of Hole H002, while only seawater was used during the first 80m of pressure cores collected in Hole H005. Herein we focus on lithologic analysis of Hole H002 with the goal of documenting and understanding core recovery in Hole H002 to compare with Hole H005. X-ray Computed Tomography (XCT) images were collected by Geotek on pressurized cores, mostly from Hole H005, and at Ohio State on unpressurized cores, mostly from Hole H002. The XCT images of unpressurized cores show minimal sedimentary structures and layering, unlike the XCT images acquired on the pressurized, hydrate-bearing cores. Only small sections of the unpressurized cores remained intact. The unpressurized cores appear to have two prominent facies: 1) silt that did not retain original sedimentary fabric and often was loose within the core barrel, and 2) dense mud sections with some sedimentary structures and layering present. On the XCT images, drilling mud appears to be concentrated on the sides of cores, but also appears in layers and fractures within

  9. Well successfully drilled with high performance water-based fluid: Santos Basins, offshore Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Fornasier, Frank C.; Luzardo, Juan P. [Halliburton Company, Houston, TX (United States); Bishnoi, M.L. [Oil and Natural Gas Corporation Ltda. (ONGC), Dehradun (India)

    2012-07-01

    takes into consideration four quadrants aspects: technical, logistical, economical, and environmental considerations. In addition, it was used to successfully drill the 8-1/2 inch interval with no NPT during horizontal drilling operations, tripping, running casing and cementing. No bit balling was observed, and it allowed excellent performance as demonstrated by wellbore conditions while tripping. The drilling fluid was left in hole for around 4 months. Only circulating and minimum treatments, like alkalinity agents and biocides, were applied. Throughout this period, the drilling fluids properties remained stable, and the caliper log presented excellent quality. (author)

  10. Air distribution system with the discharge action in the working cavity of downhole air hammer drills

    Science.gov (United States)

    Timonin, VV; Alekseev, SE; Kokoulin, DI; Kubanychbek, B.

    2018-03-01

    It is proposed to carry out pre-mine methane drainage using underground degassing holes made by downhole air hammer drills. The features of downhole air drills are described. The downhole air drill layout with the simple-shape striking part is presented with its pluses and minuses. The researchers point at available options to eliminate the shortcomings. The improved layout of the downhole air hammer drill is suggested. The paper ends with the test data on the prototype air hammer drill, its characteristics and trial drilling results.

  11. Short-radius horizontal well re-entry learning curve: prize, cost and operational experience

    Energy Technology Data Exchange (ETDEWEB)

    Boote, K. [Ocelot Energy Inc., Calgary, AB (Canada); MacDonald, R. [Lauron Engineering Ltd, Calgary, AB (Canada)

    1997-12-01

    Six mature vertical wells in Alberta belonging to Ocelot Energy Inc., were reentered and drilled horizontally. Experiences gained, the modifications made to the drilling program and the rewards in the form of incremental oil, were discussed. Details of pre- and post-performance, operational experiences with exiting the casing, building the curve, overbalance versus underbalanced drilling, motors, directional equipment, setting liners, remedial workovers and the cost of the operation were part of the discussion.

  12. Employment of Some Parameters to Enhance Laser-Drilling of Aluminum

    Directory of Open Access Journals (Sweden)

    Oday A. Hamadi

    2005-06-01

    Full Text Available In this work, some parameters affecting drilling of aluminum samples by a pulsed Nd:YAG laser were studied. These parameters are multi-pulses irradiation, controlling sample temperature, low-pressure ambient and application of electric field on the sample. Results presented in this work explained that these parameters can enhance drilling process throughout increasing hole depth in aluminum samples at the same laser energy used for irradiation.

  13. Water base drilling fluids for high-angle wells; Fluidos a base de agua para perfuracao de pocos com elevada inclinacao

    Energy Technology Data Exchange (ETDEWEB)

    Passarelli, Rui [PETROBRAS, Rio de Janeiro (Brazil). Dept. de Perfuracao. Div. de Fluidos de Perfuracao; Lomba, Rosana Fatima T [PETROBRAS, Rio de Janeiro (Brazil). Centro de Pesquisas. Div. de Explotacao

    1990-12-31

    Horizontal drilling has experimented a large increase in last years. In Brazil, two horizontal wells were drilled in Fazenda Belem and Carmopolis Fields. The first one reached a final measured depth of 1128 m and the horizontal length was 533 m. The drilling fluid program was elaborated after a large number of laboratory tests, in order to get a composition that best fitted the drilling requirements, mainly the desirable lubricity. The idea of using a water-base fluid instead of an oil-based, known as more suitable in this case, arose because the Company is interested in drilling this kind of well offshore, in deep water, where the use of oil-base muds is forbidden. Different compositions of water base muds were developed and tested in laboratory and the results led to low-solids salt fluids having a lubricant in its composition. The lubricity coefficients of these fluids are similar to those obtained with oil-base muds. 9-FZB-446D-CE well was drilled with the chosen fluid and high values of torque and drag were not registered, being the operation a total success. (author) 10 tabs.

  14. Water base drilling fluids for high-angle wells; Fluidos a base de agua para perfuracao de pocos com elevada inclinacao

    Energy Technology Data Exchange (ETDEWEB)

    Passarelli, Rui [PETROBRAS, Rio de Janeiro (Brazil). Dept. de Perfuracao. Div. de Fluidos de Perfuracao; Lomba, Rosana Fatima T. [PETROBRAS, Rio de Janeiro (Brazil). Centro de Pesquisas. Div. de Explotacao

    1989-12-31

    Horizontal drilling has experimented a large increase in last years. In Brazil, two horizontal wells were drilled in Fazenda Belem and Carmopolis Fields. The first one reached a final measured depth of 1128 m and the horizontal length was 533 m. The drilling fluid program was elaborated after a large number of laboratory tests, in order to get a composition that best fitted the drilling requirements, mainly the desirable lubricity. The idea of using a water-base fluid instead of an oil-based, known as more suitable in this case, arose because the Company is interested in drilling this kind of well offshore, in deep water, where the use of oil-base muds is forbidden. Different compositions of water base muds were developed and tested in laboratory and the results led to low-solids salt fluids having a lubricant in its composition. The lubricity coefficients of these fluids are similar to those obtained with oil-base muds. 9-FZB-446D-CE well was drilled with the chosen fluid and high values of torque and drag were not registered, being the operation a total success. (author) 10 tabs.

  15. Evaluation of four biodegradable, injectable bone cements in an experimental drill hole model in sheep.

    Science.gov (United States)

    von Rechenberg, Brigitte; Génot, Oliver R; Nuss, Katja; Galuppo, Larry; Fulmer, Mark; Jacobson, Evan; Kronen, Peter; Zlinszky, Kati; Auer, Jörg A

    2013-09-01

    Four cement applications were tested in this investigation. Two dicalcium phosphate dihydrate (DCPD-brushite) hydraulic cements, an apatite hydraulic fiber loaded cement, and a calcium sulfate cement (Plaster of Paris) were implanted in epiphyseal and metaphyseal cylindrical bone defects in sheep. The in vivo study was performed to assess the biocompatibility and bone remodeling of four cement formulations. After time periods of 2, 4, and 6 months, the cement samples were clinically and histologically evaluated. Histomorphometrically, the amount of new bone formation, fibrous tissue, and bone marrow and the area of remaining cement were measured. In all specimens, no signs of inflammation were detectable either macroscopically or microscopically. Cements differed mainly in their resorption time. Calcium sulfate was already completely resorbed at 2 months and showed a variable amount of new bone formation and/or fibrous tissue in the original drill hole over all time periods. The two DCPD cements in contrast were degraded to a large amount at 6 months, whereas the apatite was almost unchanged over all time periods. Copyright © 2013. Published by Elsevier B.V.

  16. Subsea prizes : companies pushing the envelope offshore

    Energy Technology Data Exchange (ETDEWEB)

    Macedo, R.

    2009-06-15

    In order to make projects economic, companies are going farther offshore and deeper to find oil and gas or to use existing offshore platforms and longer horizontals. Companies such as StatoilHydro are reworking strategies on how to approach future oil finds. This article discussed examples of ultra deep and long horizontal oil finds such as Statoil's complicated but highly successful Gulltopp project. Although drilling ultra-deep wells or long horizontal wells is risky, they can also be very lucrative. The article also discussed McMoRan Exploration Company of New Orleans' high-risk deeper targets in the Gulf of Mexico and its exploration strategy. The longest well in the world, drilled by Maersk Oil Qatar AS was also described. The article noted that the Danish company reported that the entire horizontal section of the well was placed within a reservoir target which was only 20 feet thick. Schlumberger helped Maersk Oil Qatar break several records with extended reach drilling (ERD) offshore well. This well set 10 records, including the longest well ever drilled; longest along-hole departure; longest 8 and a half inch section; highest ERD ratio; highest directional drilling difficulty index; deepest directional control; deepest downlink, MWD transmission and LWD geosteering; deepest battery-less operation; longest reservoir contact; and longest open hole. Last, the article discussed an unsuccessful well drilled by Murphy Oil Corporation known as the Manhattan well. 8 figs.

  17. The archaeology of drill hole U20bc, Nevada Test Site, Nye County, Nevada

    International Nuclear Information System (INIS)

    McLane, A.R.; Hemphill, M.L.; Livingston, S.J.; Pippin, L.C.; Walsh, L.A.

    1992-01-01

    Impacts to four sites near drill hole U20bc on Pahute Mesa in the northwestern part of the Nevada Test Site were mitigated through data recovery. The work was done during 1988 by the Desert Research Institute for the Department of Energy, Nevada Field Office (DOE/NV)- The four sites that warranted data recovery were 26NY3171, 26NY3173, 26NY5561 and 26NY5566. These sites had previously been determined eligible to the National Register of Historic Places. They were temporary camps that contained lithic debitage, projectile points, milling stones and pottery, and therefore contributed significant information concerning the prehistory of the area. The study of the archaeological remains shows that the prehistoric people subsisted on plant foods and game animals as determined by the artifacts including manos, metates, pottery, lithic scrapers, and projectile points. The time sensitive arfifacts (pottery and diagnostic points) suggest that the region was used from about 12,000 B.P. to just before the historic period, possibly 150 years ago. DOE/NV has met its obligation to mitigate adverse impacts to the cultural resources at U20bc. Therefore, it is recommended that this project proceed as planned

  18. Initial report on drilling into seismogenic zones of M2.0 - M5.5 earthquakes from deep South African gold mines (DSeis)

    Science.gov (United States)

    Ogasawara, Hiroshi; Durrheim, Raymond; Yabe, Yasuo; Ito, Takatoshi; van Aswegen, Gerrie; Grobbelaar, Michelle; Funato, Akio; Ishida, Akimasa; Ogasawara, Hiroyuki; Mngadi, Siyanda; Manzi, Musa; Ziegler, Martin; Ward, Tony; Moyer, Pamela; Boettcher, Margaret; Ellsworth, Bill; Liebenberg, Bennie; Wechsler, Neta; Onstott, Tullis; Berset, Nicolas

    2017-04-01

    The International Continental Scientific Drilling Program (ICDP) approved our proposal (Ogasawara et al., EGU 2016) to drill into and around seismogenic zones where critically stressed faults initiated ruptures at depth. The drilling targets include four ruptures equivalent to M2.0, 2.8, 3.5, and 5.5 that dynamically and quasi-statically evolved in 2.9 Ga hard rock in the Witwatersrand basin, South Africa. Major advantages of our drilling locations are the large quantity and high-quality of existing data from dense seismic arrays both on surface and near-field underground in three deep South African gold mines. Additionally, the great depths (1.0 to 3.3 km from surface) to collar holes reduce drilling costs significantly and enable a larger number of holes to be drilled. Flexibility in drilling direction will also allow us to minimize damage in borehole or drilled cores. With the ICDP funds, we will conduct full-core drilling of 16 holes with drilling ranges from 50 to 750 m to recover both materials and fractures in and around the seismogenic zones, followed by core and borehole logging. Additional in-hole monitoring at close proximity will be supported by co-mingled funds and will follow the ICDP drilling. Expected magnitudes of maximum shear stress are several tens of MPa. We have established an overcoring procedure to measure 3D-stress state for adverse underground working conditions so as not to interfere with mining operations. This procedure was optimized based on the Compact Conic-ended Borehole Overcoring (CCBO) technique (ISRM suggested; Sugawara and Obara, 1999). Funato and Ito (2016 IJRMMS) developed a diametrical core deformation analysis (DCDA) method to measure differential stress using only drilled core by assuming diametrical change with roll angles caused by elastic in-axisymmetrical expansion during drilling. A gold mine has already drilled a hole to intersect the hypocenter of a 2016 M3.5 earthquake and carried out the CCBO stress measurement in

  19. Development of controlled drilling system

    International Nuclear Information System (INIS)

    Kiho, Kenzo; Miyakawa, Kimio; Suzuki, Koichi; Sunaga, Takayuki

    2008-01-01

    In Japan, the soft sedimentary rock of the Neogene tertiary is being focused as a host rock for the High Level Radioactive Waste (HLW) disposal. Especially, the soft sedimentary rock at the offshore, region is thought to be one of the best candidates, since there is no driving force of the underground water. The measurement and logging in the bore hole in order to check the hydro-geological and geomechanical conditions of the host rock is a very important way to examine the potentially of the disposal candidates. The CRIEPI (Central Research Institute of Electric Power Industry) has been conducting the project about the controlled drilling technology and the measurement and logging technologies in its borehole. In 2000, as the beginning year of the project, we made the conceptual design of the drilling and measuring systems, and made key tools concerning each technology on an experimental basis. We have been developing sub tools constructing drilling and measuring systems since 2000, and applying these systems to the Horonobe site recent 5 years. We will briefly report the outline of the system and the results of drilling and measurement that were carried out at the Horonobe site. (author)

  20. Experimental study of surface quality and damage when drilling unidirectional CFRP composites

    Directory of Open Access Journals (Sweden)

    Eshetu D. Eneyew

    2014-10-01

    Full Text Available In this study, an experimental investigation on the drilling of unidirectional carbon fiber reinforced plastic (UD-CFRP composite was conducted using polycrystalline diamond (PCD tipped eight facet drill. The quality of the drilled hole surface was examined through surface roughness measurements and surface damage by scanning electron microscopy (SEM. It was found that fiber pullout occurred in two specific sectors relative to the angle between the cutting direction and the fiber orientation. The thrust force was highly influenced by the feed rate than the cutting speed and it shows a significant variation throughout the rotation of the drill.

  1. Ultrasonic/Sonic Rotary-Hammer Drills

    Science.gov (United States)

    Badescu, Mircea; Sherrit, Stewart; Bar-Cohen, Yoseph; Bao, Xiaoqi; Kassab, Steve

    2010-01-01

    Ultrasonic/sonic rotary-hammer drill (USRoHD) is a recent addition to the collection of apparatuses based on ultrasonic/sonic drill corer (USDC). As described below, the USRoHD has several features, not present in a basic USDC, that increase efficiency and provide some redundancy against partial failure. USDCs and related apparatuses were conceived for boring into, and/or acquiring samples of, rock or other hard, brittle materials of geological interest. They have been described in numerous previous NASA Tech Briefs articles. To recapitulate: A USDC can be characterized as a lightweight, lowpower, piezoelectrically driven jackhammer in which ultrasonic and sonic vibrations are generated and coupled to a tool bit. A basic USDC includes a piezoelectric stack, an ultrasonic transducer horn connected to the stack, a free mass ( free in the sense that it can bounce axially a short distance between hard stops on the horn and the bit), and a tool bit. The piezoelectric stack creates ultrasonic vibrations that are mechanically amplified by the horn. The bouncing of the free mass between the hard stops generates the sonic vibrations. The combination of ultrasonic and sonic vibrations gives rise to a hammering action (and a resulting chiseling action at the tip of the tool bit) that is more effective for drilling than is the microhammering action of ultrasonic vibrations alone. The hammering and chiseling actions are so effective that unlike in conventional twist drilling, little applied axial force is needed to make the apparatus advance into the material of interest. There are numerous potential applications for USDCs and related apparatuses in geological exploration on Earth and on remote planets. In early USDC experiments, it was observed that accumulation of cuttings in a drilled hole causes the rate of penetration of the USDC to decrease steeply with depth, and that the rate of penetration can be increased by removing the cuttings. The USRoHD concept provides for

  2. NNWSI [Nevada Nuclear Waste Storage Investigations] hole histories: UE-29a No. 1, UE-29a No. 2

    International Nuclear Information System (INIS)

    1986-11-01

    This report is a compilation of data from two hydrologic exploratory core holes drilled to help identify the area geology and hydrology. The two bore holes were drilled between September, 1981 and January, 1982 under the guidance of the US Geological Survey in Area 29, Nevada Test Site. Data presented in the hole histories include all locations, daily activities, coring records, review of hole conditions, and geophysical log lists, and microfiche copies of the geophysical logs run by the Fenix and Scisson, Inc. subcontractor

  3. Intensities of drilling predation of molluscan assemblages in intertidal and subtidal soft substrates in the Persian (Arabian) Gulf

    Science.gov (United States)

    Handler, Sabine M.; Albano, Paolo G.; Bentlage, Rudolf; Drummond, Hannah; García-Ramos, Diego A.; Zuschin, Martin

    2016-04-01

    Intensities of drilling predation of molluscan assemblages in intertidal and subtidal soft substrates in the Persian (Arabian) Gulf Sabine Maria Handler1, Paolo G. Albano1, Rudolf Bentlage2, Hannah Drummond2, D.A. García-Ramos1, Martin Zuschin1 1 Department of Paleontology, University of Vienna, Austria 2 St. Lawrence University, Canton, New York 13617, USA Trace fossils left by predators in the skeleton of their prey are arguably one of the most powerful sources of direct data on predator-prey interactions available in the fossil record. Drill holes, especially those attributed to naticid and muricid gastropods, are unambiguous marks of predation and allow discriminating between successful and unsuccessful predation attempts (complete and incomplete holes, respectively). Latitude and water depth influence drilling frequency. We inspected death assemblages of an intertidal flat and of two subtidal (water depth between 6 and 20 m) sandy sites in the Persian (Arabian) Gulf, off the coast of the United Arab Emirates, to determine the patterns of predation on shelled molluscs along the depth gradient. The study is based on ~7,000 and ~60,000 shells from the intertidal and subtidal, respectively. Drilling Frequency (DF, the number of drilled individuals), Incomplete Drilling Frequency (IDF, number of incomplete drill holes), and Prey Effectiveness (ratio between the number of incomplete drill holes and the total number of drilling attempts) were used as metrics of drilling intensity. We observed major differences between the intertidal and subtidal study areas. Drilling frequencies were generally remarkably low and intertidal flats showed a much lower drilling frequency than the subtidal (1.4% and 6.7%, respectively). In the subtidal, we observed significant differences of drilling intensity among bivalve species and between the two sites. However, predation metrics did not correlate with environmental factors such as substrate type and depth, nor with species life

  4. Parameters affecting mechanical and thermal responses in bone drilling: A review.

    Science.gov (United States)

    Lee, JuEun; Chavez, Craig L; Park, Joorok

    2018-04-11

    Surgical bone drilling is performed variously to correct bone fractures, install prosthetics, or for therapeutic treatment. The primary concern in bone drilling is to extract donor bone sections and create receiving holes without damaging the bone tissue either mechanically or thermally. We review current results from experimental and theoretical studies to investigate the parameters related to such effects. This leads to a comprehensive understanding of the mechanical and thermal aspects of bone drilling to reduce their unwanted complications. This review examines the important bone-drilling parameters of bone structure, drill-bit geometry, operating conditions, and material evacuation, and considers the current techniques used in bone drilling. We then analyze the associated mechanical and thermal effects and their contributions to bone-drilling performance. In this review, we identify a favorable range for each parameter to reduce unwanted complications due to mechanical or thermal effects. Copyright © 2018 Elsevier Ltd. All rights reserved.

  5. Influence of Steel Reinforcement on In-Situ Stress Evaluation in Concrete Structures by the Core-Drilling Method

    International Nuclear Information System (INIS)

    McGinnis, M. J.; Pessiki, S.

    2006-01-01

    The core-drilling method is an emerging technique for evaluating in-situ stress in a concrete structure. A small hole is drilled into the structure, and the deformations in the vicinity of the hole are measured and related via elasticity theory to the stress. The method is similar to the ASTM hole-drilling strain-gauge method excepting that displacements rather than strains are the measured quantities. The technique may be considered nondestructive since the ability of the structure to perform its function is unaffected, and the hole is easily repaired. Displacement measurements in the current work are performed using 3D digital image correlation and industrial photogrammetry. The current paper addresses perturbations in the method caused by steel reinforcement within the concrete. The reinforcement is significantly stiffer than the surrounding concrete, altering the expected displacement field. A numerical investigation performed indicates an under-prediction of stress by as much as 18 percent in a heavily reinforced structure, although the effect is significantly smaller for more common amounts of reinforcement

  6. Influence of Steel Reinforcement on In-Situ Stress Evaluation in Concrete Structures by the Core-Drilling Method

    Science.gov (United States)

    McGinnis, M. J.; Pessiki, S.

    2006-03-01

    The core-drilling method is an emerging technique for evaluating in-situ stress in a concrete structure. A small hole is drilled into the structure, and the deformations in the vicinity of the hole are measured and related via elasticity theory to the stress. The method is similar to the ASTM hole-drilling strain-gauge method excepting that displacements rather than strains are the measured quantities. The technique may be considered nondestructive since the ability of the structure to perform its function is unaffected, and the hole is easily repaired. Displacement measurements in the current work are performed using 3D digital image correlation and industrial photogrammetry. The current paper addresses perturbations in the method caused by steel reinforcement within the concrete. The reinforcement is significantly stiffer than the surrounding concrete, altering the expected displacement field. A numerical investigation performed indicates an under-prediction of stress by as much as 18 percent in a heavily reinforced structure, although the effect is significantly smaller for more common amounts of reinforcement.

  7. Measurement of laser absorptivity for operating parameters characteristic of laser drilling regime

    Energy Technology Data Exchange (ETDEWEB)

    Schneider, M; Berthe, L; Fabbro, R; Muller, M [Laboratoire pour l' Application des Lasers de Puissance, UPR CNRS no1578, 16 Bis, Avenue Prieur de la Cote D' Or, 94114 Arcueil Cedex (France)], E-mail: matthieu.schneider@gmail.com

    2008-08-07

    Laser drilling in the percussion regime is commonly used in the aircraft industry to drill sub-millimetre holes in metallic targets. Characteristic laser intensities in the range of 10 MW cm{sup -2} are typically employed for drilling metallic targets. With these intensities the temperature of the irradiated matter is above the vaporization temperature and the drilling process is led by hydrodynamic effects. Although the main physical processes involved are identified, this process is not correctly understood or completely controlled. A major characteristic coefficient of laser-matter interaction for this regime, which is the absorptivity of the laser on the irradiated surface, is still unknown, because of the perturbing effects due to laser beam geometrical trapping inside the drilled hole. So, by using time resolved experiments, this study deals with the direct measurement of the variation of the intrinsic absorption of aluminium, nickel and steel materials, as a function of the incident laser intensity up to 20 MW cm{sup -2}. We observe that for this incident intensity, the absorptivity can reach up to 80%. This very high and unexpected value is discussed by considering the microscopic behaviour of the heated matter near the vapour-liquid interface that undergoes possible Rayleigh-Taylor instability or volume absorption.

  8. Measurement of laser absorptivity for operating parameters characteristic of laser drilling regime

    Science.gov (United States)

    Schneider, M.; Berthe, L.; Fabbro, R.; Muller, M.

    2008-08-01

    Laser drilling in the percussion regime is commonly used in the aircraft industry to drill sub-millimetre holes in metallic targets. Characteristic laser intensities in the range of 10 MW cm-2 are typically employed for drilling metallic targets. With these intensities the temperature of the irradiated matter is above the vaporization temperature and the drilling process is led by hydrodynamic effects. Although the main physical processes involved are identified, this process is not correctly understood or completely controlled. A major characteristic coefficient of laser-matter interaction for this regime, which is the absorptivity of the laser on the irradiated surface, is still unknown, because of the perturbing effects due to laser beam geometrical trapping inside the drilled hole. So, by using time resolved experiments, this study deals with the direct measurement of the variation of the intrinsic absorption of aluminium, nickel and steel materials, as a function of the incident laser intensity up to 20 MW cm-2. We observe that for this incident intensity, the absorptivity can reach up to 80%. This very high and unexpected value is discussed by considering the microscopic behaviour of the heated matter near the vapour-liquid interface that undergoes possible Rayleigh-Taylor instability or volume absorption.

  9. A status report on artificial lift systems and challenges in North Dakota horizontal completions

    Energy Technology Data Exchange (ETDEWEB)

    Fangmeier, K. [Amerada Hess Corp., ND (United States)

    2005-07-01

    Partially pressure depleted reservoirs and unfavorable horizontal flow geometries can impact artificial lift designs and diagnostics. In addition, terrain slugging, drilling fines, high gas volume fractions, H{sub 2}S gas and high bottom hole temperatures also pose challenges. This paper provides an overview of various systems utilized by Amerada Hess, a company which examines methods of reducing gas lift gas volumes to achieve maximum flow. A description of naturally fractured reservoirs and limited natural fractures was provided. A comparison was presented between the original conditions at Beaver Lodge Madison and existing conditions with horizontal development. Various artificial lift challenges were examined. It was suggested that high volume lift utilizing gas lift was the preferred artificial lift system for high volume wells. It was noted that downhole sensors can be used as an indicator of potential run life. However, reliability is limited by downhole operating temperatures and electrical ground faults. A comparison of friendly and unfriendly flow systems was presented, as well as a gas lift pressure chart. A summary of average gas volume systems was provided as well as an example of a response to increase drawdown. Examples of downhole Electric Submersible Pump (ESP) sensors were provided, as well as possible flowing pressure profiles in horizontal completion because of the constraints of lift capacity. It was concluded that a single point injection and proven gas lift system is the next step in high volume lift strategy. 2 tabs, 16 figs.

  10. Borehole and geohydrologic data for test hole USW UZ-6, Yucca Mountain area, Nye County, Nevada

    International Nuclear Information System (INIS)

    Whitfield, M.S. Jr.; Loskot, C.L.; Cope, C.M.

    1993-01-01

    Test hole USW UZ-6, located 1.8 kilometers west of the Nevada Test Site on a major north-trending ridge at Yucca Mountain, was dry drilled in Tertiary tuff to a depth of 575 meters. The area near this site is being considered by the US Department of Energy for potential construction of a high-level, radioactive-waste repository. Test hole USW UZ-6 is one of seven test holes completed in the unsaturated zone as part of the US Geological Survey's Yucca Mountain Project to characterize the potential repository site. Data pertaining to borehole drilling and construction, lithology of geologic units penetrated, and laboratory analyses for hydrologic characteristics of samples of drill-bit cuttings are included in this report

  11. 瓦斯抽放煤层增透深孔聚能爆破钻孔参数%Drilling parameters of deep-hole cumulative blasting to improve coal seam permeability in gas drainage

    Institute of Scientific and Technical Information of China (English)

    郭德勇; 吕鹏飞; 单智勇; 谢安

    2013-01-01

    以焦作煤业集团九里山矿煤层深孔聚能爆破试验为基础,利用数值模拟分析了爆破煤体应力变化规律,发现聚能爆破效应导致应力峰值增大,扩大了煤体裂隙区范围.同时对聚能爆破钻孔参数进行优化,确定了合理的炮孔直径、爆破孔间距、爆破孔与邻近抽放孔及煤层顶底板间距.现场试验结果表明:优化的钻孔参数不仅使聚能爆破增透效果显著而且保证了爆破过程的安全.%Based on coal seam deep-hole cumulative blasting experiments in Jiulishan Coal Mine of Jiaozuo Coal Group, the law of stress change in a blasting coal body was analyzed by numerical simulation. It is found that cumulative blasting effect leads to the increase of peak stress and enlarges the crack zone range of the coal body. Drilling parameters for cumulative blasting, such as blast hole diameter, blast hole spacing, distance between the blast hole and the adjacent gas drainage hole, and distance from the blast hole to the coal seam roof and floor, were determined by optimization. Field experimental results show that after using these optimized drilling parameters the cumulative blasting not only gets remarkable permeability increasing effect but also ensures blasting safety.

  12. Dome-shaped PDC cutters drill harder rock effectively

    International Nuclear Information System (INIS)

    Moran, D.P.

    1992-01-01

    This paper reports that rock mechanics and sonic travel time log data indicate that bits with convex-shaped polycrystalline diamond compact (PDC) cutters can drill harder rock formations than comparable bits with flat PDC cutters. The Dome-shaped cutters have drilled carbonate formations with sonic travel times as small as 50 μsec/ft, compared to the standard cutoff of 75 μsec/ft for flat PCD cutters. Recent field data from slim hole wells drilled in the Permian basin have shown successful applications of the 3/8-in. Dome cutter in the Grayburg dolomite with its sonic travel times as low as 50-55 μsec/ft and compressive strengths significantly greater than the standard operating range for PDC bit applications. These field data indicate that the Dome cutters can successfully drill hard rock. The convex cutter shape as good impact resistance, cuttings removal, heat dissipation, and wear resistance

  13. Effect of cutting parameters on workpiece and tool properties during drilling of Ti-6Al-4V

    International Nuclear Information System (INIS)

    Celik, Yahya Hisman; Yildiz, Hakan

    2016-01-01

    The main aim of machining is to provide the dimensional preciseness together with surface and geometric quality of the workpiece to be manufactured within the desired limits. Today, it is quite hard to drill widely utilized Ti-6Al-4 V alloys owing to their superior features. Therefore, in this study, the effects of temperature, chip formation, thrust forces, surface roughness, burr heights, hole diameter deviations and tool wears on the drilling of Ti-6Al-4 V were investigated under dry cutting conditions with different cutting speeds and feed rates by using tungsten carbide (WC) and high speed steel (HSS) drills. Moreover, the mathematical modeling of thrust force, surface roughness, burr height and tool wear were formed using Matlab. It was found that the feed rate, cutting speed and type of drill have a major effect on the thrust forces, surface roughness, burr heights, hole diameter deviations and tool wears. Optimum results in the Ti-6Al-4 V alloy drilling process were obtained using the WC drill.

  14. Effect of cutting parameters on workpiece and tool properties during drilling of Ti-6Al-4V

    Energy Technology Data Exchange (ETDEWEB)

    Celik, Yahya Hisman; Yildiz, Hakan [Batman Univ. (Turkey). Dept. of Mechanical Engineering; Oezek, Cebeli [Firat Univ., Elazig (Turkey)

    2016-08-01

    The main aim of machining is to provide the dimensional preciseness together with surface and geometric quality of the workpiece to be manufactured within the desired limits. Today, it is quite hard to drill widely utilized Ti-6Al-4 V alloys owing to their superior features. Therefore, in this study, the effects of temperature, chip formation, thrust forces, surface roughness, burr heights, hole diameter deviations and tool wears on the drilling of Ti-6Al-4 V were investigated under dry cutting conditions with different cutting speeds and feed rates by using tungsten carbide (WC) and high speed steel (HSS) drills. Moreover, the mathematical modeling of thrust force, surface roughness, burr height and tool wear were formed using Matlab. It was found that the feed rate, cutting speed and type of drill have a major effect on the thrust forces, surface roughness, burr heights, hole diameter deviations and tool wears. Optimum results in the Ti-6Al-4 V alloy drilling process were obtained using the WC drill.

  15. The art of drilling; L'art de forer

    Energy Technology Data Exchange (ETDEWEB)

    Charlez, Ph. [Total, La Defense 6, Exploration-Production, Recherche et Developpement, 92 - Courbevoie (France)

    2003-06-01

    Since about 15 years, the well drilling techniques have undergone an unprecedented technological revolution. A few deviated or horizontal wells only are needed today to reach oil resources 10 km away while many vertical wells were needed in the past for the same operation. These techniques multiply the possibilities of reaching oil reservoirs in complex geological areas but they also have to adapt to more and more severe conditions (high water depths, high pressures and temperatures) which raise new problems. This article treats of the new geometries of wells with multi-drains and of the data acquisition and treatment tools for the control of the drilling progression (measurement while drilling (MWD), logging while drilling (LWD), seismic while drilling (SWD)) and for the real-time visualisation of the well profile inside the geologic formations (3-D imaging). Intelligent completion systems with remote controlled valves are used to selectively control the production of the different branches of the well in the case of a multi-layer reservoir. (J.S.)

  16. Confined compressive strength model of rock for drilling optimization

    Directory of Open Access Journals (Sweden)

    Xiangchao Shi

    2015-03-01

    Full Text Available The confined compressive strength (CCS plays a vital role in drilling optimization. On the basis of Jizba's experimental results, a new CCS model considering the effects of the porosity and nonlinear characteristics with increasing confining pressure has been developed. Because the confining pressure plays a fundamental role in determining the CCS of bottom-hole rock and because the theory of Terzaghi's effective stress principle is founded upon soil mechanics, which is not suitable for calculating the confining pressure in rock mechanics, the double effective stress theory, which treats the porosity as a weighting factor of the formation pore pressure, is adopted in this study. The new CCS model combined with the mechanical specific energy equation is employed to optimize the drilling parameters in two practical wells located in Sichuan basin, China, and the calculated results show that they can be used to identify the inefficient drilling situations of underbalanced drilling (UBD and overbalanced drilling (OBD.

  17. You say you want a revolution: casing drilling targets 30 per cent well-cost saving

    Energy Technology Data Exchange (ETDEWEB)

    Polczer, S.; Marsters, S.

    1999-10-01

    Casing drilling is a new method of drilling that eliminates drill strings by using standard casing to simultaneously drill and case wells. Tesco Corporation of Calgary acquired patent rights to casing drilling technology in 1995. The company now offers a conversion kit for existing drill rigs as well a new compact casing drilling rig for shallow markets. The single derrick will be rated at 1,500 meters, but initially it will be used to drill 700-800 meter gas wells in southeast Alberta. Some cost savings will be realized at these shallow depths, but the real cost saving advantages will be realized on deep holes. In the meantime, improvements are planned to the cutting structures of the under-rimming bit to increase safety and withstand higher torque loads. It will be also necessary to adapt techniques such as directional drilling and logging to the casing drilling conveyance mechanism which has been only partially successful thus far, especially in the retrieving mode. Another challenge already met, involved ensuring that casing could be run in high-compression loads without damage to connections. Despite these problems, the system attracted considerable attention with several international companies placing orders for immediate delivery. Another system, this one developed by Sperry-Sun Drilling Services and known as a 'casing while drilling' (CWD) system, is strictly a downhole assembly and is targeted for offshore use and deeper vertical holes. This system is currently being tested in two commercial operations in offshore Indonesia for Unocal Corporation. Despite numerous problems to fill casing with fluid during connections, penetration rates of 300-400 feet per hour were achieved.

  18. Salt dissolution in oil and gas test holes in central Kansas. Part I. Salt beds in the subsurface in Russell, Lincoln, Ellsworth, Barton, and Rice Counties, central Kansas

    International Nuclear Information System (INIS)

    Walters, R.F.

    1975-06-01

    The Hutchinson Salt Member of the Permian Wellington Formation is described in a five-county study area of 4,000 square miles. Most of the 22,200 oil and gas test holes in the study area were drilled with fresh water, causing dissolution of the salt during drilling, commonly resulting in borehole enlargement to three times the diameter of the drill bit (some older rotary drilled holes have borehole enlargement up to 10 ft). After drilling ceases, no salt dissolution occurs in oil and gas test holes which have properly cemented surface casing protecting all aquifers above the salt. The conclusion is reached that extensive dissolution of the Hutchinson Salt in oil and gas test holes in central Kansas is a rare and unusual event in the 50-year history since the discovery of oil in Russell County in 1923. In only seven known instances (six of which are within the study area) did such dissolution lead to collapse and surface subsidence. With an estimated 72,000 holes drilled through the Hutchinson Salt Member within the State of Kansas, this is a ratio of approximately one occurrence for every 10,000 oil and gas test holes

  19. Operational performace of horizontal drillings in the deep aquiferous gas storage Kalle; Betriebsverhalten von Horizontalbohrungen im tiefen Aquifergasspeicher Kalle

    Energy Technology Data Exchange (ETDEWEB)

    Klafki, M.; Kammel, D. [DBI Gas- und Umwelttechnik GmbH, Freiberg (Germany); Below, P.J. [VEW Energie AG, Dortmund (Germany)

    1998-12-31

    The aquiferous structure Kalle, located in the Emsland, has contained compressed natural gas in the middle sandstone formation of the Volpriehausen-sandstone for 20 years. The storage stratum is between 2100 and 2200 m deep, 10-13 m thick and sufficiently porous and permeable. Gas storage operation and operational performance of the horizontal holes are described in this article. Filling and injection performance are also described. (orig./MSK) [Deutsch] Die im Emsland gelegene Aquiferstruktur Kalle fuehrt im Volpriehausen-Sandstein der geologischen Formation `Mittlerer Buntsandstein` nunmehr seit fast 20 Jahren eingepresstes Erdgas. Die Speicherschicht ist dort 2100 bis 2200 m tief, 10 bis 13 m maechtig und ausreichend poroes und permeabel. Im Folgenden werden der Gasspeicherbetrieb und das Betriebsverhalten der Horizontalbohrungen beschrieben. Das Ausspeisungsverhalten und das Injektionsverhalten werden ebenfalls erlaeutert. (orig./MSK)

  20. Comparison of revegetation of a gas pipeline right-of-way in two forested wetland crossings involving conventional methods of pipeline installation and horizontal drilling, Nassau County, Florida

    Energy Technology Data Exchange (ETDEWEB)

    Van Dyke, G.D. [Trinity Christian Coll., Palos Heights, IL (United States). Dept. of Biology; Shem, L.M.; Zimmerman, R.E. [Argonne National Lab., IL (United States)

    1993-10-01

    One year after pipeline installation, vegetation in the right-of-way (ROW) was inventoried at two stream floodplain crossings in Nassau County, Florida. Both sites were forested wetlands composed of Acer rubrum, Fraxinus caroliniana, Liquidamber styraciflua, Nyssa ogecho, Quercus laurifolia, and Taxodium distichum, together with other wetland trees. Pipeline installation across the Brandy Branch floodplain was by conventional ditching and backfill methods. Installation across the Deep Creek floodplain was by horizontal drilling after clearcutting the ROW. The latter method left tree stumps, understory vegetation, and soil layers intact, except for disruptions caused by logging. According to the inventory, vegetation at the drilled site was more diverse (nearly twice as many species occurring in the ROW as at the trenched site) and more robust (no unvegetated exposed soil compared to 15% at the trenched site). Differences between the ROW vegetation at the two sites can be attributed to both site differences and installation technologies used.

  1. Individual Drilling Bit Design and Optimization in Mahu Area

    Directory of Open Access Journals (Sweden)

    Zhang Wenbo

    2017-01-01

    Full Text Available There are three sets of gravels in Mahu region. The gravels formation is characterized by high heterogeneity, high abrasiveness and poor drillability. It is so difficult to optimize bit that restrict seriously the overall exploration and development process. The compressive strength, internal friction angle, and drillability of the formation are tested to check the rock mechanical characteristic profile established by logging data. The individual bit design is carried out by the 3D simulation technology. A new PDC bit type is designed to form the drill bit series for Mahu area. Single PDC bit increases 90% of the drilling footage. The trip average footage is improved 3.45 times, the horizontal section average penetration increased 34.8%. The technical achievements have greatly improved economic development benefits of Mahu region by improving drilling speed and saving drilling costs.

  2. NNWSI [Nevada Nuclear Waste Storage Investigations] 51 seismic hole histories

    International Nuclear Information System (INIS)

    1987-09-01

    This report is a compilation of data from fifty-one shallow boreholes drilled within the Nevada Test Site (NTS) and the adjacent Bureau of Land Management (BLM) lands. The boreholes were drilled to determine the alluvial thickness and subsurface structure. Once drilled the boreholes were used to emplace explosive charges of three seismic refraction surveys conducted in 1981, 1983 and 1984. The information presented in this report includes location maps, daily activities and reviews of hole condition

  3. Microstructure modification of 2024 aluminum alloy produced by friction drilling

    Energy Technology Data Exchange (ETDEWEB)

    Eliseev, A.A., E-mail: alan@ispms.ru [Institute of Strength Physics and Materials Science SB RAS, Tomsk 634055 (Russian Federation); Fortuna, S.V. [Institute of Strength Physics and Materials Science SB RAS, Tomsk 634055 (Russian Federation); Kolubaev, E.A. [Institute of Strength Physics and Materials Science SB RAS, Tomsk 634055 (Russian Federation); National Research Tomsk Polytechnic University, Tomsk 634050 (Russian Federation); Kalashnikova, T.A. [Institute of Strength Physics and Materials Science SB RAS, Tomsk 634055 (Russian Federation)

    2017-04-13

    In this study modification of AA2024 microstructure produced by friction drilling was investigated. To reveal the role of deformation, high temperature and friction on microstructure modification methods of optical and scanning electron microscopy and microhardness test were used. Different zones of material around friction drilling hole has a special characterization through grain size, volume fraction and size of incoherent second phase particles and microhardness. It has been found that deformation, high temperature and friction in friction drilling process lead to recrystallization of grain structure and dissolution of incoherent second phase particles due to strain-induced dissolution effect. Microhardness of recrystallized material has increased.

  4. HETEROGENEOUS SHALLOW-SHELF CARBONATE BUILDUPS IN THE PARADOX BASIN, UTAH AND COLORADO: TARGETS FOR INCREASED OIL PRODUCTION AND RESERVES USING HORIZONTAL DRILLING TECHNIQUES. Semi-Annual Technical Progress Report April 6, 2000 - October 5, 2002

    International Nuclear Information System (INIS)

    Chidsey, Thomas C. Jr.

    2002-01-01

    The Paradox Basin of Utah, Colorado, Arizona, and New Mexico contains nearly 100 small oil fields producing from carbonate buildups within the Pennsylvanian (Desmoinesian) Paradox Formation. These fields typically have one to 10 wells with primary production ranging from 700,000 to 2,000,000 barrels (111,300-318,000 m 3 ) of oil per field and a 15 to 20 percent recovery rate. At least 200 million barrels (31.8 million m 3 ) of oil will not be recovered from these small fields because of inefficient recovery practices and undrained heterogeneous reservoirs. Several fields in southeastern Utah and southwestern Colorado are being evaluated as candidates for horizontal drilling and enhanced oil recovery from existing, vertical, field wells based upon geological characterization and reservoir modeling case studies. Geological characterization on a local scale is focused on reservoir heterogeneity, quality, and lateral continuity, as well as possible reservoir compartmentalization, within these fields. This study utilizes representative cores, geophysical logs, and thin sections to characterize and grade each field's potential for drilling horizontal laterals from existing development wells. The results of these studies can be applied to similar fields elsewhere in the Paradox Basin and the Rocky Mountain region, the Michigan and Illinois Basins, and the Midcontinent region. This report covers research activities for the first half of the third project year (April 6 through October 5, 2002). This work included capillary pressure/mercury injection analysis, scanning electron microscopy, and pore casting on selected samples from Cherokee and Bug fields, Utah. The diagenetic fabrics and porosity types found at these fields are indicators of reservoir flow capacity, storage capacity, and potential for enhanced oil recovery via horizontal drilling. The reservoir quality of Cherokee and Bug fields has been affected by multiple generations of dissolution, anhydrite plugging

  5. Exploration Drilling and Technology Demonstration At Fort Bliss

    Energy Technology Data Exchange (ETDEWEB)

    Barker, Ben; Moore, Joe [EGI; Segall, Marylin; Nash, Greg; Simmons, Stuart; Jones, Clay; Lear, Jon; Bennett, Carlon

    2014-02-26

    The Tularosa-Hueco basin in south-central New Mexico has long been known as an extensional area of high heat flow. Much of the basin is within the Fort Bliss military reservation, which is an exceptionally high value customer for power independent of the regional electric grid and for direct use energy in building climate control. A series of slim holes drilled in the 1990s established the existence of a thermal anomaly but not its practical value. This study began in 2009 with a demonstration of new exploration drilling technology. The subsequent phases reported here delivered a useful well, comparative exploration data sets and encouragement for further development. A production-size well, RMI56-5, was sited after extensive study of archival and newly collected data in 2010-2011. Most of 2012 was taken up with getting state and Federal authorities to agree on a lead agency for permitting purposes, getting a drilling permit and redesigning the drilling program to suit available equipment. In 2013 we drilled, logged and tested a 924 m well on the McGregor Range at Fort Bliss using a reverse circulation rig. Rig tests demonstrated commercial permeability and the well has a 7-inch slotted liner for use either in production or injection. An August 2013 survey of the completed well showed a temperature of 90 C with no reversal, the highest such temperature in the vicinity. The well’s proximity to demand suggests a potentially valuable resource for direct use heat and emergency power generation. The drilling produced cuttings of excellent size and quality. These were subjected to traditional analyses (thin sections, XRD) and to the QEMScan™ for comparison. QEMScan™ technology includes algorithms for determining such properties of rocks as density, mineralogy, heavy/light atoms, and porosity to be compared with direct measurements of the cuttings. In addition to a complete cuttings set, conventional and resistivity image logs were obtained in the open hole before

  6. Enhancing cuttings removal with gas blasts while drilling on Mars

    Science.gov (United States)

    Zacny, K. A.; Quayle, M. C.; Cooper, G. A.

    2005-04-01

    Future missions to Mars envision use of drills for subsurface exploration. Since the Martian atmosphere precludes the use of liquids for cuttings removal, proposed drilling machines utilize mechanical cuttings removal systems such as augers. However, an auger can substantially contribute to the total power requirements, and in the worst scenario it can choke. A number of experiments conducted under Martian pressures showed that intermittent blasts of gas at low differential pressures can effectively lift the cuttings out of the hole. A gas flushing system could be incorporated into the drill assembly for assistance in clearing the holes of rock cuttings or for redundancy in case of auger jamming. A number of variables such as the particle size distribution of the rock powder, the type of gas used, the bit and auger side clearances, the initial mass of cuttings, and the ambient pressure were investigated and found to affect the efficiency. In all tests the initial volume of gas was close to 1 L and the differential pressure was varied to achieve desired clearing efficiencies. Particles were being lifted out of the hole at a maximum speed of 6 m/s at a differential pressure of 25 torr and ambient pressure of 5 torr. Flushing tests lasted on average for 2 s. The power required to compress the thin Martian atmosphere to achieve a sufficient gas blast every minute or so at 10% efficiency was calculated to be of the order of a few watts.

  7. Oriented cluster perforating technology and its application in horizontal wells

    Directory of Open Access Journals (Sweden)

    Huabin Chen

    2016-11-01

    Full Text Available An oriented cluster perforating technology, which integrates both advantages of cluster and oriented perforating, will help solve a series of technical complexities in horizontal well drilling. For realizing its better application in oil and gas development, a series of technologies were developed including perforator self-weight eccentricity, matching of the electronic selective module codes with the surface program control, axial centralized contact signal transmission, and post-perforation intercluster sealing insulation. In this way, the following functions could be realized, such as cable-transmission horizontal well perforator self-weight orientation, dynamic signal transmission, reliable addressing & selective perforation and post-perforation intercluster sealing. The combined perforation and bridge plug or the multi-cluster perforation can be fulfilled in one trip of perforation string. As a result, the horizontal-well oriented cluster perforating technology based on cable conveying was developed. This technology was successfully applied in unconventional gas reservoir exploitation, such as shale gas and coalbed methane, with accurate orientation, reliable selective perforation and satisfactory inter-cluster sealing. The horizontal-well oriented cluster perforating technology benefits the orientation of horizontal well drilling with a definite target and direction, which provides a powerful support for the subsequent reservoir stimulation. It also promotes the fracturing fluid to sweep the principal pay zones to the maximum extent. Moreover, it is conductive to the formation of complex fracture networks in the reservoirs, making quality and efficient development of unconventional gas reservoirs possible.

  8. A Proposal for Research and Development of an Explosive Drilling Technique for Geothermal Wells

    Energy Technology Data Exchange (ETDEWEB)

    None

    1975-10-01

    In order to make large scale use of the geothermal energy available it will be necessary to drill many thousands of holes deep into the earth. The objective of the proposed research is to greatly decrease drilling time and cost. Studies made of a new explosive drilling technique indicate that savings in time of from 70 to 80 percent. The research plan is to utilize explosive in the form of multiple-faced shaped charge capsules. [DJE-2005

  9. Determination of transient temperature distribution inside a wellbore considering drill string assembly and casing program

    International Nuclear Information System (INIS)

    Yang, Mou; Zhao, Xiangyang; Meng, Yingfeng; Li, Gao; Zhang, Lin; Xu, Haiming; Tang, Daqian

    2017-01-01

    Highlights: • The different wellbore conditions of heat transfer models were developed. • Drill string assembly and casing programs impact on down-hole temperatures. • The thermal performance in circulation and shut-in stages were deeply investigated. • Full-scale model coincided with the measured field data preferably. - Abstract: Heat exchange efficiency between each region of the wellbore and formation systems is influenced by the high thermal conductivity of the drill string and casing, which further affects temperature distribution of the wellbore. Based on the energy conservation principle, the Modified Raymond, Simplified and Full-scale models were developed, which were solved by the fully implicit finite difference method. The results indicated that wellbore and formation temperatures were significantly influenced at the connection points between the drill collar and drill pipe, as well as the casing shoe. Apart from the near surface, little change was observed in temperature distribution in the cement section. In the open-hole section, the temperature rapidly decreased in the circulation stage and gradually increased in the shut-in stage. Most important, the simulated result from the full-scale model coincided with the measured field data better than the other numerical models. These findings not only confirm the effect of the drill string assembly and casing programs on the wellbore and formation temperature distribution, but also contribute to resource exploration, drilling safety and reduced drilling costs.

  10. The Effects of Bit Wear on Respirable Silica Dust, Noise and Productivity: A Hammer Drill Bench Study.

    Science.gov (United States)

    Carty, Paul; Cooper, Michael R; Barr, Alan; Neitzel, Richard L; Balmes, John; Rempel, David

    2017-07-01

    Hammer drills are used extensively in commercial construction for drilling into concrete for tasks including rebar installation for structural upgrades and anchor bolt installation. This drilling task can expose workers to respirable silica dust and noise. The aim of this pilot study was to evaluate the effects of bit wear on respirable silica dust, noise, and drilling productivity. Test bits were worn to three states by drilling consecutive holes to different cumulative drilling depths: 0, 780, and 1560 cm. Each state of bit wear was evaluated by three trials (nine trials total). For each trial, an automated laboratory test bench system drilled 41 holes 1.3 cm diameter, and 10 cm deep into concrete block at a rate of one hole per minute using a commercially available hammer drill and masonry bits. During each trial, dust was continuously captured by two respirable and one inhalable sampling trains and noise was sampled with a noise dosimeter. The room was thoroughly cleaned between trials. When comparing results for the sharp (0 cm) versus dull bit (1560 cm), the mean respirable silica increased from 0.41 to 0.74 mg m-3 in sampler 1 (P = 0.012) and from 0.41 to 0.89 mg m-3 in sampler 2 (P = 0.024); levels above the NIOSH recommended exposure limit of 0.05 mg m-3. Likewise, mean noise levels increased from 112.8 to 114.4 dBA (P < 0.00001). Drilling productivity declined with increasing wear from 10.16 to 7.76 mm s-1 (P < 0.00001). Increasing bit wear was associated with increasing respirable silica dust and noise and reduced drilling productivity. The levels of dust and noise produced by these experimental conditions would require dust capture, hearing protection, and possibly respiratory protection. The findings support the adoption of a bit replacement program by construction contractors. © The Author 2017. Published by Oxford University Press on behalf of the British Occupational Hygiene Society.

  11. Formation evaluation using measurements recorded while drilling

    International Nuclear Information System (INIS)

    Coope, D.F.; Hendricks, W.E.

    1984-01-01

    Two of the measurements recorded while drilling (MWD), gamma ray and resistivity, are traditionally formation evaluation measurements. However, their primary user thus far has been the drilling engineer. The authors believe that MWD will have increasing importance in formation evaluation, and that a good understanding of MWD resistivity and gamma ray logs will be needed by the log analyst. MWD gamma ray and resistivity logs are similar to their wireline counterparts, but there are significant differences. The differences stem from different invasion (or lack of invasion) development for MWD as opposed to open hole wireline; drill collar influence on both the resistivity and gamma ray (GR) measurements - this influence is both positive and negative; and logging speed (drilling rate for MWD) is much slower for MWD and can vary erratically. The MWD logs presented in this paper demonstrate the value of using MWD logs. Emphasis is placed on both the qualitative and quantitative techniques available to the log analyst to help him get maximum benefit from the MWD logs

  12. Understanding how the placement of an asymmetric vibration damping tool within drilling while underreaming can influence performance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Kabbara, Alan; McCarthy, John; Burnett, Timm; Forster, Ian [National Oilwell Varco Downhole Ltd. (NOV), Houston, TX (United States)

    2012-07-01

    This paper describes the work, on test rigs and full-scale drilling rigs, carried out with respect to placement of an Asymmetric Vibration Damping Tool (AVDT) within drilling while under reaming operations. An AVDT, by virtue of the forward synchronous motion imposed on the drill string, offers benefits in minimizing down hole vibration-related tool failures and therefore maximizing rate of penetration (ROP). Of interest in using the AVDT is the tendency to minimize stick slip by means of the parasitic torque it generates. This is of particular importance during under reaming operations. While under reaming, stick slip can result in low (ROP) and potentially an increased incidence of down hole tool failures. The use of an AVDT in these operations has been shown to significantly reduce stick slip. However, due to the forward synchronous motion caused by the AVDT, there is the potential to cause eccentric wear to the Bottom Hole Assembly (BHA) components in the vicinity of the AVDT. If allowed to progress, this eccentric wear can cause a reduction in down hole tool life and drilling performance. Eliminating eccentric wear would be beneficial in reducing repair costs, extending component life and further improving drilling performance. To minimize eccentric wear and maximize drilling performance, the placement of the AVDT within the BHA is critical. This paper describes how the placement of intermediate stabilizers between the AVDT and the under reamer can minimize eccentric wear to the under reamer and the adjacent drill string due to the forward synchronous whirl induced by the AVDT. This approach allows the full benefits of the AVDT to be recognized while reducing the potentially damaging effects of eccentric wear to other BHA components. The work has drawn upon small-scale rig testing, full-scale testing at the Ullrigg test facility in Norway and from real-world drilling and under reaming operations in the USA. (author)

  13. On the performances and wear of WC-diamond like carbon coated tools in drilling of CFRP/Titanium stacks

    Science.gov (United States)

    Boccarusso, L.; Durante, M.; Impero, F.; Minutolo, F. Memola Capece; Scherillo, F.; Squillace, A.

    2016-10-01

    The use of hybrid structures made of CFRP and titanium alloys is growing more and more in the last years in the aerospace industry due to the high strength to weight ratio. Because of their very different characteristics, the mechanical fastening represent the most effective joining technique for these materials. As a consequence, drilling process plays a key role in the assembly. The one shot drilling, i.e. the contemporary drilling of the stack of the two materials, seems to be the best option both in terms of time saving and assembly accuracy. Nevertheless, due to the considerable different machinability of fiber reinforced plastics and metallic materials, the one shot drilling is a critical process both for the holes quality and for the tools wear. This research was carried out to study the effectiveness of new generation tools in the drilling of CFRP/Titanium stacks. The tools are made of sintered grains of tungsten carbide (WC) in a binder of cobalt and coated with Diamond like carbon (DLC), and are characterized by a patented geometry; they mainly differ in parent WC grain size and binder percentage. Both the cutting forces and the wear phenomena were accurately investigated and the results were analyzed as a function of number of holes and their quality. The results show a clear increase of the cutting forces with the number of holes for all the used drilling tools. Moreover, abrasive wear phenomena that affect initially the tools coating layer were observed.

  14. Test plan for sonic drilling at the Hanford Site in FY 1993

    International Nuclear Information System (INIS)

    McLellan, G.W.

    1993-01-01

    This test plan describes the field demonstration of the sonic drilling system being conducted as a coordinated effort between the VOC-Arid ID (Integrated Demonstration) and the 200 West Area Carbon Tetrachloride ERA (Expedited Response Action) programs at Hanford. The purpose of this test is to evaluate the Water Development Corporation's drilling system, modify components as necessary and determine compatible drilling applications for the sonic drilling method for use at facilities in the DOE complex. The sonic demonstration is being conducted as the first field test under the Cooperative Research and Development Agreement (CRADA) which involves the US Department of Energy, Pacific Northwest Laboratory, Westinghouse Hanford Company and Water Development Corporation. The sonic drilling system will be used to drill a 45 degree vadose zone well, two vertical wells at the VOC-Arid ID site, and several test holes at the Drilling Technology Test Site north of the 200 Area fire station. Testing at other locations will depend on the performance of the drilling method. Performance of this technology will be compared to the baseline drilling method (cable-tool)

  15. Elemental Geochemistry of Samples From Fault Segments of the San Andreas Fault Observatory at Depth (SAFOD) Drill Hole

    Science.gov (United States)

    Tourscher, S. N.; Schleicher, A. M.; van der Pluijm, B. A.; Warr, L. N.

    2006-12-01

    Elemental geochemistry of mudrock samples from phase 2 drilling of the San Andreas Fault Observatory at Depth (SAFOD) is presented from bore hole depths of 3066 m to 3169 m and from 3292 m to 3368 m, which contain a creeping section and main trace of the fault, respectively. In addition to preparation and analysis of whole rock sample, fault grains with neomineralized, polished surfaces were hand picked from well-washed whole rock samples, minimizing the potential contamination from drilling mud and steel shavings. The separated fractions were washed in deionized water, powdered using a mortar and pestle, and analyzed using an Inductively Coupled Plasma- Optical Emission Spectrometer for major and minor elements. Based on oxide data results, systematic differences in element concentrations are observed between the whole rock and fault rock. Two groupings of data points are distinguishable in the regions containing the main trace of the fault, a shallow part (3292- 3316 m) and a deeper section (3320-3368 m). Applying the isocon method, assuming Zr and Ti to be immobile elements in these samples, indicates a volume loss of more than 30 percent in the shallow part and about 23 percent in the deep part of the main trace. These changes are minimum estimates of fault-related volume loss, because the whole rock from drilling samples contains variable amount of fault rock as well. Minimum estimates for volume loss in the creeping section of the fault are more than 50 percent when using the isocon method, comparing whole rock to plucked fault rock. The majority of the volume loss in the fault rocks is due to the dissolution and loss of silica, potassium, aluminum, sodium and calcium, whereas (based on oxide data) the mineralized surfaces of fractures appear to be enriched in Fe and Mg. The large amount of element mobility within these fault traces suggests extensive circulation of hydrous fluids along fractures that was responsible for progressive dissolution and leaching

  16. Vertical-horizontal wells for depletion and sweep

    Energy Technology Data Exchange (ETDEWEB)

    Muraikhi, A. J.; Pham, T. R.; Liu, J. S.; Khatib, M. R.; Muhaish, A. S. [Saudi Aramco (Saudi Arabia)

    1998-12-31

    A well completion scheme currently in use in a thick, large, elongated carbonate anticline Middle-East oil reservoir is described. This method of well completion calls for a combination of an open hole horizontal section penetrating the top 10 feet of the reservoir and a cased or undisturbed vertical segment through the thick formation. The horizontal section is used for producing and the vertical segment is used for monitoring purposes. Field experience and supported reservoir simulation exercises have shown that the horizontal application is superior to conventional vertical completion both from the economic and from the sweep point of view. 4 refs., 12 figs.

  17. Environmental Measurement While Drilling System for Real-Time Field Screening of Contaminants

    International Nuclear Information System (INIS)

    Lockwood, G.J.; Normann, R.A.; Williams, C.V.

    1999-01-01

    Sampling during environmental drilling is essential to fully characterize the spatial distribution and migration of subsurface contaminants. However, analysis of the samples is expensive and time-consuming: off-site laboratory analysis can take weeks or months. Real-time information on environmental conditions, drill bit location and temperature during drilling is valuable in many environmental restoration operations. This type of information can be used to provide field screening data and improved efficiency of site characterization activities. The Environmental Measurement-While-Drilling (EMWD) System represents an innovative blending of new and existing technology in order to obtain real-time data during drilling. The system consists of two subsystems. The down-hole subsystem (at the drill bit) consists of sensors, a power supply, a signal conditioning and transmitter board, and a radio-frequency (RF) coaxial cable. The up-hole subsystem consists of a battery pack/coil, pickup coil, receiver, and personal computer. The system is compatible with fluid miser drill pipe, a directional drilling technique that uses minimal drilling fluids and generates little to no secondary waste. In EMWD, downhole sensors are located behind the drill bit and linked by a high-speed data transmission system to a computer at the surface. Sandia-developed Windowstrademark-based software is used for data display and storage. As drilling is conducted, data is collected on the nature and extent of contamination, enabling on-the-spot decisions regarding drilling and sampling strategies. Initially, the downhole sensor consisted of a simple gamma radiation detector, a Geiger-Mueller tube (GMT). The design includes data assurance techniques to increase safety by reducing the probability of giving a safe indication when an unsafe condition exists. The EMWD system has been improved by the integration of a Gamma Ray Spectrometer (GRS) in place of the GMT. The GRS consists of a sodium iodide

  18. Evaluation of circularity error in drilling of syntactic foam composites

    Science.gov (United States)

    Ashrith H., S.; Doddamani, Mrityunjay; Gaitonde, Vinayak

    2018-04-01

    Syntactic foams are widely used in structural applications of automobiles, aircrafts and underwater vehicles due to their lightweight properties combined with high compression strength and low moisture absorption. Structural application requires drilling of holes for assembly purpose. In this investigation response surface methodology based mathematical models are used to analyze the effects of cutting speed, feed, drill diameter and filler content on circularity error both at entry and exit level in drilling of glass microballoon reinforced epoxy syntactic foam. Experiments are conducted based on full factorial design using solid coated tungsten carbide twist drills. The parametric analysis reveals that circularity error is highly influenced by drill diameter followed by spindle speed at the entry and exit level. Parametric analysis also reveals that increasing filler content decreases circularity error by 13.65 and 11.96% respectively at entry and exit levels. Average circularity error at the entry level is found to be 23.73% higher than at the exit level.

  19. Drilling technology advances on four fronts

    Energy Technology Data Exchange (ETDEWEB)

    Budd, G.

    2002-01-01

    Trends and advances in drilling technology are discussed. Four different major trends have been identified. One of these is proprietary case drilling which is said to allow operators to simultaneously drill, case, and evaluate oil and gas wells. In proprietary case drilling, the well is drilled with standard oil field casing which remains in the hole all the time, eliminating the need for tripping. Drill bits and other downhole tools are lowered via wireline inside the casing and latched to the last joint of casing. Wells are drilled either by rotating the casing or by using a downhole mud motor for steering, using conventional directional tools. This technology was introduced by Tesco and is marketed in 25 countries along with a full range of drilling products and services. Super single rigs are an other trend which, owing to their versatility, combined with relatively small environmental footprint have become the rig of choice in a growing number of drilling programs. Super single rigs use 45-ft. joints of drill pipe, more versatile top drives and they have an automated pipe handling system. Super singles can be used on both vertical and slant wells and offer advantages of lower costs, higher efficiencies and greater drilling depths. Given their low environmental impact hydraulic capability, super singles also find application where zero disturbance rules are in effect, as for example, in some parts of southern Alberta. Directional drilling and MWD are most associated with SAGD projects but they also have been used and made significant difference in other spheres of oil recovery as well. The fact is that about 35 percent of wells drilled today are drilled with some form of directional drilling; this will stimulate the growth of ever more advanced MWD technology. Northern rigs are in a class of their own in that here the emphasis is on keeping the crew warm, as opposed to lots of gadgets. The most immediately-visible heat-conserving modification is the 60-ft wind

  20. Investigation on the Effects of Process Parameters on Laser Percussion Drilling Using Finite Element Methodology; Statistical Modelling and Optimization

    Directory of Open Access Journals (Sweden)

    Mahmoud Moradi

    Full Text Available Abstract In the present research, the simulation of the Nickel-base superalloy Inconel 718 fiber-laser drilling process with the thickness of 1mm is investigated through the Finite Element Method. In order to specify the appropriate Gaussian distribution of laser beam, the results of an experimental research on glass laser drilling were simulated using three types of Gaussian distribution. The DFLUX subroutine was used to implement the laser heat sources of the models using the Fortran language. After the appropriate Gaussian distribution was chosen, the model was validated with the experimental results of the Nickel-base superalloy Inconel 718 laser drilling process. The negligible error percentage among the experimental and simulation results demonstrates the high accuracy of this model. The experiments were performed based on the Response Surface Methodology (RSM as a statistical design of experiment (DOE approach to investigate the influence of process parameters on the responses, obtaining the mathematical regressions and predicting the new results. Four parameters i.e. laser pulse frequency (150 to 550 Hz, laser power (200 to 500 watts, laser focal plane position (-0.5 to +0.5 mm and the duty cycle (30 to 70% were considered to be the input variables in 5 levels and four external parameters i.e. the hole's entrance and exit diameters, hole taper angle and the weight of mass removed from the hole, were observed to be the process output responses of this central composite design. By performing the statistical analysis, the input and output parameters were found to have a direct relation with each other. By an increase in each of the input variables, the entrance and exit hole diameters, the hole taper angel, and the weight of mass removed from the hole increase. Finally, the results of the conducted simulations and statistical analyses having been used, the laser drilling process was optimized by means of the desire ability approach. Good