WorldWideScience

Sample records for high standard upgrading

  1. The analysis and rationale behind the upgrading of existing standard definition thermal imagers to high definition

    Science.gov (United States)

    Goss, Tristan M.

    2016-05-01

    With 640x512 pixel format IR detector arrays having been on the market for the past decade, Standard Definition (SD) thermal imaging sensors have been developed and deployed across the world. Now with 1280x1024 pixel format IR detector arrays becoming readily available designers of thermal imager systems face new challenges as pixel sizes reduce and the demand and applications for High Definition (HD) thermal imaging sensors increases. In many instances the upgrading of existing under-sampled SD thermal imaging sensors into more optimally sampled or oversampled HD thermal imaging sensors provides a more cost effective and reduced time to market option than to design and develop a completely new sensor. This paper presents the analysis and rationale behind the selection of the best suited HD pixel format MWIR detector for the upgrade of an existing SD thermal imaging sensor to a higher performing HD thermal imaging sensor. Several commercially available and "soon to be" commercially available HD small pixel IR detector options are included as part of the analysis and are considered for this upgrade. The impact the proposed detectors have on the sensor's overall sensitivity, noise and resolution is analyzed, and the improved range performance is predicted. Furthermore with reduced dark currents due to the smaller pixel sizes, the candidate HD MWIR detectors are operated at higher temperatures when compared to their SD predecessors. Therefore, as an additional constraint and as a design goal, the feasibility of achieving upgraded performance without any increase in the size, weight and power consumption of the thermal imager is discussed herein.

  2. Guidelines for Home Energy Upgrade Professionals: Standard Work Specifications for Multifamily Energy Upgrades (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2011-08-01

    This fact sheet provides essential information about the 2011 publication of the Workforce Guidelines for Multifamily Home Energy Upgrades, including their origin, their development with the help of industry leaders to create the standard work specifications for retrofit work.

  3. Performance of Drift-Tube Detectors at High Counting Rates for High-Luminosity LHC Upgrades

    CERN Document Server

    Bittner, Bernhard; Kortner, Oliver; Kroha, Hubert; Manfredini, Alessandro; Nowak, Sebastian; Ott, Sebastian; Richter, Robert; Schwegler, Philipp; Zanzi, Daniele; Biebel, Otmar; Hertenberger, Ralf; Ruschke, Alexander; Zibell, Andre

    2016-01-01

    The performance of pressurized drift-tube detectors at very high background rates has been studied at the Gamma Irradiation Facility (GIF) at CERN and in an intense 20 MeV proton beam at the Munich Van-der-Graaf tandem accelerator for applications in large-area precision muon tracking at high-luminosity upgrades of the Large Hadron Collider (LHC). The ATLAS muon drifttube (MDT) chambers with 30 mm tube diameter have been designed to cope with and neutron background hit rates of up to 500 Hz/square cm. Background rates of up to 14 kHz/square cm are expected at LHC upgrades. The test results with standard MDT readout electronics show that the reduction of the drift-tube diameter to 15 mm, while leaving the operating parameters unchanged, vastly increases the rate capability well beyond the requirements. The development of new small-diameter muon drift-tube (sMDT) chambers for LHC upgrades is completed. Further improvements of tracking e?ciency and spatial resolution at high counting rates will be achieved with ...

  4. Pyrolysis oil upgrading for Co-processing in standard refinery units

    NARCIS (Netherlands)

    De Miguel Mercader, F.

    2010-01-01

    This thesis considers the route that comprises the upgrading of pyrolysis oil (produced from lingo-cellulosic biomass) and its further co-processing in standard refineries to produce transportation fuels. In the present concept, pyrolysis oil is produced where biomass is available and then

  5. Production of advanced biofuels: co-processing of upgraded pyrolysis oil in standard refinery units

    NARCIS (Netherlands)

    De Miguel Mercader, F.; de Miguel Mercader, F.; Groeneveld, M.J.; Hogendoorn, Kees; Kersten, Sascha R.A.; Way, N.W.J.; Schaverien, C.J.

    2010-01-01

    One of the possible process options for the production of advanced biofuels is the co-processing of upgraded pyrolysis oil in standard refineries. The applicability of hydrodeoxygenation (HDO) was studied as a pyrolysis oil upgrading step to allow FCC co-processing. Different HDO reaction end

  6. Upgrade of internal events PSA model using the AESJ level-1 PSA standard for operating state

    International Nuclear Information System (INIS)

    Sato, Teruyoshi; Yoneyama, Mitsuru; Hirokawa, Naoki; Sato, Chikahiro; Sato, Eisuke; Tomizawa, Shigeatsu

    2009-01-01

    In 2003, the Atomic Energy Society of Japan (AESJ) started to develop the Level-1 Probabilistic Safety Assessment (PSA) standard of internal events for operating state (AESJ standard). The AESJ standard has been finished to be asked for public comment. Using the AESJ standard (draft version), the authors have upgraded the PSA model for Tokyo Electric Power Company (TEPCO) BWR-5 plant not only to reflect latest knowledge but also to ensure high quality of PSA model (not yet peer-reviewed) for the purpose of better operation and maintenance management of TEPCO BWR plants. For example, the categorization of structures, systems and components (SSCs) will be performed to improve nuclear reactor safety using information of risk importance. (author)

  7. High Flux Isotope Reactor power upgrade status

    International Nuclear Information System (INIS)

    Rothrock, R.B.; Hale, R.E.; Cheverton, R.D.

    1997-01-01

    A return to 100-MW operation is being planned for the High Flux Isotope Reactor (HFIR). Recent improvements in fuel element manufacturing procedures and inspection equipment will be exploited to reduce hot spot and hot streak factors sufficiently to permit the power upgrade without an increase in primary coolant pressure. Fresh fuel elements already fabricated for future use are being evaluated individually for power upgrade potential based on their measured coolant channel dimensions

  8. SLHC, the High-Luminosity Upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2010-01-01

    In the morning of June 23rd a public event is organised in CERN's Council Chamber with the aim of providing the particle physics community with up-to-date information about the strategy for the LHC luminosity upgrade and to describe the current status of preparation work. The presentations will provide an overview of the various accelerator sub-projects, the LHC physics prospects and the upgrade plans of ATLAS and CMS. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the LHC High Luminosity Upgrade project. Informing the public is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  9. Upgradation of Apsara reactor

    International Nuclear Information System (INIS)

    Mammen, S.; Mukherjee, P.; Bhatnagar, A.; Sasidharan, K.; Raina, V.K.

    2009-01-01

    Apsara is a 1 MW swimming pool type research reactor using high enriched uranium as fuel with light water as coolant and moderator. The reactor is in operation for more than five decades and has been extensively used for basic research, radioisotope production, neutron radiography, detector testing, shielding experiments etc. In view of its long service period, it is planned to carry out refurbishment of the reactor to extend its useful life. During refurbishment, it is also planned to upgrade the reactor to a 2 MW reactor to improve its utilization and to upgrade the structure, system and components in line with the current safety standards. This paper gives a brief account of the design features and safety aspects of the upgraded Apsara reactor. (author)

  10. Major upgrades of the high frequency B-dot probe diagnostic suite on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Ochoukov Roman

    2017-01-01

    Full Text Available The high frequency B-dot (HFB probe diagnostic on the ASDEX Upgrade tokamak has undergone a considerable upgrade during the 2016 opening of the torus. The probe coverage is now greatly expanded toroidally, as well as radially with the addition of probes on the high field side and the removable manipulator head. A new 2-channel fast digitizer now allows to examine and record radio frequency (RF wave emissions emanating from the plasma in the ion cyclotron range of frequencies (ICRF. Possible studies that can be achieved now include: a study of core ICRF power absorption efficiency; a study of ion cyclotron emissions from the plasma generated by energetic ions; and study of ICRF wave/plasma turbulence interactions in the scrape-off layer region.

  11. High voltage multiplexing for the ATLAS Tracker Upgrade

    International Nuclear Information System (INIS)

    Villani, E G; Phillips, P; Matheson, J; Lynn, D; Hommels, L B A; Gregor, I; Bessner, M; Tackmann, K; Newcomer, F M; Spencer, E; Greenall, A

    2014-01-01

    The increased luminosity of the HL-LHC will require more channels in the upgraded ATLAS Tracker, as a result of the finer detector segmentation, stemming from the otherwise too high occupancy. Among the many technological challenges facing the ATLAS Tracker Upgrade there is more an efficient power distribution and HV biasing of the sensors. The solution adopted in the current ATLAS detector uses one HV conductor for each sensor, which makes it easy to disable malfunctioning sensors without affecting the others, but space constraints and material budget considerations renders this approach impractical for the Upgraded detector. A number of approaches, including the use of the same HV line to bias several sensors and suitable HV switches, along with their control circuitry, are currently being investigated for this purpose. The proposed solutions along with latest test results and measurements will be described

  12. ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC

    CERN Document Server

    Valderanis, Chrysostomos; The ATLAS collaboration

    2015-01-01

    ATLAS Muon Spectrometer Upgrades for the High Luminosity LHC The luminosity of the LHC will increase up to 2x10^34 cm-2s-1 after the long shutdown in 2019 (phase-1 upgrade) and up to 7x10^34 cm-2s-1 after the long shutdown in 2025 (phase-2 upgrade). In order to cope with the increased particle fluxes, upgrades are envisioned for the ATLAS muon spectrometer. At phase-1, the current innermost stations of the ATLAS muon endcap tracking system (the Small Wheels) will be upgraded with 2x4-layer modules of Micromega detectors, sandwiched by two 4 layer modules of small strip Thin Gap Chambers on either side. Each 4-layer module of the so-called New Small Wheels covers a surface area of approximately 2 to 3 m2 for a total active area of 1200 m2 each for the two technologies. On such large area detectors, the mechanical precision (30 \\mu m along the precision coordinate and 80 \\mu m along the beam) is a key point and must be controlled and monitored along the process of construction and integration. The design and re...

  13. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  14. Upgrading and modernization of the high flux reactor Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1992-01-01

    The High Flux Reactor (HFR) at Petten, The Netherlands, owned by the European Communities and operated by the Netherlands Energy Research Foundation, is a water-cooled and moderated, multipurpose research reactor of the closed-tank in-pool type, operated at 45 MW. Performance upgrading comprised two power increases from 20 MW via 30 MW to 45 MW, providing more and higher rated irradiation positions in the tank. With the replacement of the original reactor vessel the experimental capabilities of the reactor were improved. Better pool side facilities and the introduction of a large cross-section, double, beam tube were implemented. Additional major installation upgrading activities consisted of the replacement of the primary and the pool heat exchangers, replacement of the beryllium reflector elements, extension of the overpower protection systems and upgrading of the nuclear instrumentation as well as the guaranteed power supply. Control room upgrading is in progress. A full new safety analysis, as well as the introduction of a comprehensive Quality Assurance system, are summarized under software upgrading. Continuous modernization and upgrading also takes place of equipment for fuel and structural materials irradiations for fission reactors and future fusion machines. In parallel, all supporting services, as well as the management structure for large irradiation programmes, have been developed. Presently the reactor is operating at about 275 full power days per year with an average utilization of the irradiation positions of 70 to 80%. (orig.)

  15. Upgrading Temelin to international standards

    International Nuclear Information System (INIS)

    Anderson, J.J.; Gisoni, G.A.; Stormer, T.D.

    1994-01-01

    The digital technology being installed to upgrade the Instrumentation and Control system at the Temelin twin VVER-1000 station in the Czech Republic will allow the plant to operate more safely because it allows key information to be organised and presented to the operators, enabling them to make better informed decisions about the status of the plant. The new system is based on proven technology previously applied at Beznau in Switzerland and Sizewell B in the UK. (author)

  16. The trend of the research and development for the upgrade of the high current energy system

    International Nuclear Information System (INIS)

    2010-01-01

    The high current energy technology ranges from a basic technology of the electric power field to a state-of-the-art technology and has been used extremely variously. In addition, as the energy technology advances, the expansion of applied field, such as the nuclear fusion and the exhaust thing processing, etc., requires a further upgrade of the large current technology. In this report, the trend of the research and development for the upgrade of the high current energy technology are summarized. In the following, the elemental technology including arc/plasma phenomena and the pulse power system is described in Chapter 2. In Chapter 3, the trend of the research and development for the upgrade of various equipments and devices such as the nuclear fusion development, the superconducting applications of SMES and the maglev transportation system, and the arc application of the exhaust processing for a medical waste, the radio active waste and a detrimental gas and the next generation lithography system. In Chapter 4, the analysis and the measurement technology of the arc phenomenon and the standardization of current shunt, etc are described. We hope this research report can contribute to the promotion of technical exchanges in different fields, and offer guidelines for future development in this high current energy technology. (author)

  17. High-luminosity LHC prospects with the upgraded ATLAS detector

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00379172; The ATLAS collaboration

    2016-01-01

    Run 1 at the LHC was very successful with the discovery of a new boson. The boson’s properties are found to be compatible with those of the Standard Model Higgs boson. It is now revealing the mechanism of electroweak symmetry breaking and (possibly) the discovery of physics beyond the Standard Model that are the primary goals of the just restarted LHC. The ultimate precision will be reached at the high-luminosity LHC run with a proton-proton centre-of-mass energy of 14 TeV. In this contribution physics prospects are presented for ATLAS for the integrated luminosities 300 and 3000 fb−1: the ultimate precision attainable on measurements of the Higgs boson couplings to elementary fermions and bosons, its trilinear self-coulping, as well as perspectives on the searches for partners associated with it. Benchmark studies are presented to show how the sensitivity improves at the future LHC runs. For all these studies, a parameterised simulation of the upgraded ATLAS detector is used and expected pileup condition...

  18. High resolution upgrade of the ATF damping ring BPM system

    International Nuclear Information System (INIS)

    Terunuma, N.; Urakawa, J.; Frisch, J.; May, J.; McCormick, D.; Nelson, J.; Seryi, A.; Smith, T.; Woodley, M.; Briegel, C.; Dysert, R.

    2008-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented

  19. Overview of new, upgraded, or proposed high energy physics facilities in the United States and Canada

    International Nuclear Information System (INIS)

    Gabriel, T.A.

    1994-01-01

    This article reviews six new, proposed, or upgraded accelerator facilities in the United States and Canada. All of the accelerators that are presented here in one form or fashion challenge the validity of the Standard Model of high energy physics which ''currently explains'' all experimentally know phenomena. These facilities include the Continuous Electron Beam Accelerator Facility (CEBAF) at Newport News, Virginia, the Kaon Factory at TRIUMF in Vancouver, British Columbia, Canada, the Asymmetric B Factory at the Stanford Linear Accelerator Center (SLAC) in Palo Alto, California, the Relativistic Heavy Ion Collider (RHIC) facility at Brookhaven National Laboratory in Upton, New York, the injector upgrade project at the Fermi National Accelerator Laboratory (FNAL) in Batavia, Illinois, and the Superconducting Super Collider Laboratory (SSCL) in Waxachachie, Texas

  20. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00439268; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of 7.5 × 1034 cm−2s−1, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture and expected ...

  1. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00421104; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of $7.5 \\times 10^{34} cm^{-2}s^{-1}$, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture an...

  2. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    George, Simon; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of 7.5 × 10^{34} cm^{−2}s^{−1}, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architecture and ...

  3. ATLAS Trigger and Data Acquisition Upgrades for High Luminosity LHC

    CERN Document Server

    Balunas, William Keaton; The ATLAS collaboration

    2016-01-01

    The ATLAS experiment at CERN is planning a second phase of upgrades to prepare for the "High Luminosity LHC", a 4th major run due to start in 2026. In order to deliver an order of magnitude more data than previous runs, 14 TeV protons will collide with an instantaneous luminosity of $7.5 × 10^{34}$ cm$^{−2}$s$^{−1}$, resulting in much higher pileup and data rates than the current experiment was designed to handle. While this extreme scenario is essential to realise the physics programme, it is a huge challenge for the detector, trigger, data acquisition and computing. The detector upgrades themselves also present new requirements and opportunities for the trigger and data acquisition system. Initial upgrade designs for the trigger and data acquisition system are shown, including the real time low latency hardware trigger, hardware-based tracking, the high throughput data acquisition system and the commodity hardware and software-based data handling and event filtering. The motivation, overall architectur...

  4. High-voltage pixel sensors for ATLAS upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Perić, I., E-mail: ivan.peric@ziti.uni-heidelberg.de [Heidelberg University, Institute of Computer Engineering, Mannheim (Germany); Kreidl, C.; Fischer, P. [Heidelberg University, Institute of Computer Engineering, Mannheim (Germany); Bompard, F.; Breugnon, P.; Clemens, J.-C.; Fougeron, D.; Liu, J.; Pangaud, P.; Rozanov, A.; Barbero, M. [CPPM, Marseille (France); Feigl, S.; Capeans, M.; Ferrere, D.; Pernegger, H.; Ristic, B. [CERN, Geneve (Switzerland); Muenstermann, D.; Gonzalez Sevilla, S.; La Rosa, A.; Miucci, A. [University of Geneve (Switzerland); and others

    2014-11-21

    The high-voltage (HV-) CMOS pixel sensors offer several good properties: a fast charge collection by drift, the possibility to implement relatively complex CMOS in-pixel electronics and the compatibility with commercial processes. The sensor element is a deep n-well diode in a p-type substrate. The n-well contains CMOS pixel electronics. The main charge collection mechanism is drift in a shallow, high field region, which leads to a fast charge collection and a high radiation tolerance. We are currently evaluating the use of the high-voltage detectors implemented in 180 nm HV-CMOS technology for the high-luminosity ATLAS upgrade. Our approach is replacing the existing pixel and strip sensors with the CMOS sensors while keeping the presently used readout ASICs. By intelligence we mean the ability of the sensor to recognize a particle hit and generate the address information. In this way we could benefit from the advantages of the HV sensor technology such as lower cost, lower mass, lower operating voltage, smaller pitch, smaller clusters at high incidence angles. Additionally we expect to achieve a radiation hardness necessary for ATLAS upgrade. In order to test the concept, we have designed two HV-CMOS prototypes that can be readout in two ways: using pixel and strip readout chips. In the case of the pixel readout, the connection between HV-CMOS sensor and the readout ASIC can be established capacitively.

  5. Constructing an I and C Upgrade Architecture for Korea Standard Nuclear Power Plants

    International Nuclear Information System (INIS)

    Suh, Yong Suk; Hur, Seop; Kim, Dong Hoon; Sung, Chan Ho; Kang, Hyun Tai; Lee, Jae Ki; Cho, Chang Hwan

    2008-01-01

    This paper presents three architectures of the KSNP I and C upgrade. The architectures are constructed with an adoption of PLCs and DCS technology and 3-phase upgrade strategy. The 3-phase upgrade strategy is established to ensure the safety of the upgrade. Based on the architecture, the cabinet configuration is being constructed. From the configuration, it is expected to figure out how to optimize the layout of the cabinets. It is required to study the performance and safety design requirements of the upgrade further

  6. Conceptual Design of the Cryogenic System for the High-luminosity Upgrade of the Large Hadron Collider (LHC)

    Science.gov (United States)

    Brodzinski, K.; Claudet, S.; Ferlin, G.; Tavian, L.; Wagner, U.; Van Weelderen, R.

    The discovery of a Higgs boson at CERN in 2012 is the start of a major program of work to measure this particle's properties with the highest possible precision for testing the validity of the Standard Model and to search for further new physics at the energy frontier. The LHC is in a unique position to pursue this program. Europe's top priority is the exploitation of the full potential of the LHC, including the high-luminosity upgrade of the machine and detectors with an objective to collect ten times more data than in the initial design, by around 2030. To reach this objective, the LHC cryogenic system must be upgraded to withstand higher beam current and higher luminosity at top energy while keeping the same operation availability by improving the collimation system and the protection of electronics sensitive to radiation. This paper will present the conceptual design of the cryogenic system upgrade with recent updates in performance requirements, the corresponding layout and architecture of the system as well as the main technical challenges which have to be met in the coming years.

  7. Upgrade of the ATLAS Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Tang, Fukun; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter of ATLAS covering the central region of the ATLAS experiment. TileCal will undergo a major replacement of its on- and off-detector electronics in 2024 for the high luminosity program of the LHC. The calorimeter signals will be digitized and sent directly to the off-detector electronics, where the signals are reconstructed and transmitted to the first level of trigger at a rate of 40 MHz. This will provide a better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. The off-detector electronics are based on the Advanced Telecommunications Computing Architecture (ATCA) standard and are equipped with high performance optical connectors. The system is designed to operate in a high radiation envi...

  8. Upgrade of the ATLAS Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Tang, Fukun; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter of ATLAS cover-ing the central region of the ATLAS experiment. TileCal will undergo a major replacement of its on- and off-detector electronics in 2024 for the high luminosity program of the LHC. The calorimeter signals will be digitized and sent directly to the off-detector electronics, where the signals are reconstructed and shipped to the first level of trigger at a rate of 40 MHz. This will provide a better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. The off-detector electronic is based on the Advanced Telecommunications Computing Architecture (ATCA) standard and is equipped with high performance optical connectors. The system is designed to operate in a high radiation environmen...

  9. Instrumentation Standard Architectures for Future High Availability Control Systems

    International Nuclear Information System (INIS)

    Larsen, R.S.

    2005-01-01

    Architectures for next-generation modular instrumentation standards should aim to meet a requirement of High Availability, or robustness against system failure. This is particularly important for experiments both large and small mounted on production accelerators and light sources. New standards should be based on architectures that (1) are modular in both hardware and software for ease in repair and upgrade; (2) include inherent redundancy at internal module, module assembly and system levels; (3) include modern high speed serial inter-module communications with robust noise-immune protocols; and (4) include highly intelligent diagnostics and board-management subsystems that can predict impending failure and invoke evasive strategies. The simple design principles lead to fail-soft systems that can be applied to any type of electronics system, from modular instruments to large power supplies to pulsed power modulators to entire accelerator systems. The existing standards in use are briefly reviewed and compared against a new commercial standard which suggests a powerful model for future laboratory standard developments. The past successes of undertaking such projects through inter-laboratory engineering-physics collaborations will be briefly summarized

  10. Upgrade of the CATS sample changer on FIP-BM30A at the ESRF: towards a commercialized standard

    International Nuclear Information System (INIS)

    Jacquamet, L.; Joly, J.; Charrault, P.; Pirocchi, M.; Vernede, X.; Bouis, F.; Borel, F.; Ferrer, J.L.; Perin, J.P.; Denis, T.; Rechatin, J.L.

    2009-01-01

    An upgraded version of the sample changer 'CATS' (Cryogenic Automated Transfer System) that was developed on the FIP-BM30A beamline at the ESRF is presented. At present, CATS is installed at SLS (three systems), BESSY (one system), DLS (two systems) and APS (four systems for the LSCAT beamline). It consists mainly of an automated Dewar with an assortment of specific grippers designed to obtain a fast and reliable mounting/dismounting rate without jeopardizing the flexibility of the system. The upgraded system has the ability to manage any sample standard stored in any kind of puck. (authors)

  11. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Lingemann, Joschka; Sakulin, Hannes; Jeitler, Manfred; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run 2 of the Large Hadron Collider pose new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run 1, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new microTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (GMT) which combines information from the muon trigger sub-systems and assigns the isolation variable. The upgraded GMT will be implemented using a Master Processor 7 card, built by Imperial College, that features a large Xilinx Virtex 7 FPGA. Up to 72 optical links at...

  12. Study for the LHCb upgrade read-out board

    CERN Document Server

    Cachemiche, J P; Hachon, F; Le Gac, R; Marin, F; 10.1088/1748-0221/5/12/C12036

    2010-01-01

    The LHCb experiment envisages to upgrade its readout electronics in order to increase the readout rate from 1 MHz to 40 MHz. This electronics upgrade is very challenging, since readout boards will have to handle a higher number of serial links with an increased bandwidth. In addition, the new communication protocol (GBT) developed by the CERN micro-electronics group mixes data acquisition, slow control and clock distribution on the same link. To explore the feasibility of such a readout system, elementary building blocks have been studied. Their goals are multiple: understand signal integrity when using highly integrated high speed serial links running at 8 - 10 Gbits/s; test the implementation of the GBT protocol within FPGAs; understand advantages and limitations of commercial standard with a predefined interconnection topology; validate ideas on how to control easily such a system. We designed two boards compliant with the xTCA standard which meets an increasing interest in the physics community. The first...

  13. Upgrade of the CMS Tracker for the High Luminosity LHC

    CERN Document Server

    Auzinger, Georg

    2016-01-01

    The LHC machine is planning an upgrade program which will smoothly bring the luminosity to about $ 5 \\times 10^{34}$cm$^{-2}$s$^{-1}$ in 2028, possibly reaching an integrated luminosity of 3000 fb$^{-1}$ by the end of 2037. This High Luminosity LHC scenario, HL-LHC, will require a preparation program of the LHC detectors known as Phase-2 Upgrade. The current CMS Tracker, including both inner pixel and outer strip systems, is already running beyond design specifications and will not be able to survive HL-LHC radiation conditions. CMS will need a completely new device in order to fully exploit the demanding operating conditions and the delivered luminosity. The upgrade plan includes extending the Pixel Detector in the forward region from the current coverage of $ \\lvert \\eta \\rvert < 2.4 $ to $ \\lvert \\eta \\rvert < 4$, where up to seven forward- and four extension disks will compose the new detector. Additionally, the new outer system should also have trigger capabilities. To achieve such goals, R\\&...

  14. High rate tests of the LHCb RICH Upgrade system

    CERN Multimedia

    Blago, Michele Piero

    2016-01-01

    One of the biggest challenges for the upgrade of the LHCb RICH detectors from 2020 is to readout the photon detectors at the full 40 MHz rate of the LHC proton-proton collisions. A test facility has been setup at CERN with the purpose to investigate the behaviour of the Multi Anode PMTs, which have been proposed for the upgrade, and their readout electronics at high trigger rates. The MaPMTs are illuminated with a monochromatic laser that can be triggered independently of the readout electronics. A first series of tests, including threshold scans, is performed at low trigger rates (20 kHz) for both the readout and the laser with the purpose to characterise the behaviour of the system under test. Then the trigger rate is increased in two separate steps. First the MaPMTs are exposed to high illumination by triggering the pulsed laser at a high (20 MHz) repetition rate while the DAQ is readout at the same low rate as before. In this way the performance of the MaPMTs and the attached electronics can be evaluated ...

  15. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  16. Upgrades and expansion of the Cornell High Energy Synchrotron Source (CHESS)

    International Nuclear Information System (INIS)

    White, Jeffrey A.

    2000-01-01

    The Cornell High Energy Synchrotron Source (CHESS) is a user-oriented National Facility that provides state-of-the-art synchrotron radiation facilities to scientists worldwide. With major new funding in 1999, we now have 5 ongoing upgrade and expansion projects: 1) a new building addition that will house a new wiggler beamline (CHESS G-line) with three new experimental stations; 2) a new more powerful wiggler source for both A and G beamlines; 3) an upgrade to the A-line optics for better heat load handling and focussing; 4) a rebuild of the F-cave optics room with new optics to handle higher machine current; and 5) a renovation to the user laboratory space surrounding the F1 and F2 crystallography stations. We expect these upgrades and a new G line Cornell faculty collaborating group to raise the level of excitement and productivity at CHESS for many years to come

  17. The new centrifuge high-speed pellet injector for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Lang, P.T.; Andelfinger, C.; Beck, W.; Buchelt, E.; Buechl, K.; Cierpka, P.; Kollotzek, H.; Lang, R.S.; Prausner, G.; Soeldner, F.X.; Ulrich, M.; Weber, G.

    1993-04-01

    We report on the new pellet injection system for refuelling the ASDEX Upgrade tokamak with cubic H 2 or D 2 pellets having alternative side lengths of 1.5, 1.75 and 2.0 mm and optional Ne doping. The system delivers series of about one hundred pellets at a maximum repetition rate of more than 40 Hz. The pellets are accelerated by means of a centrifuge with an optimized straight acceleration arm. This configuration minimizes the compulsive force acting on the pellet during the acceleration process. Since this also minimizes stresses inside the pellet, high velocities - a maximum of 1211 m/s being achieved - are possible without destroying the hydrogen cubes. A special pellet feed-in technique based on a static stop cylinder interrupting the acceleration path successfully reduced the horizontal scattering angle to values of less than ± 4 degrees. Thus, a high efficiency - with more than 90% of the pellets arriving within the acceptance angle - was achieved without using a guide tube. The whole system was found to work very reliably and reproducibly during the whole test operation period, covering about 10 5 pellet shots. The new centrifuge, now integrated into the ASDEX Upgrade setup, has proved to be a reliable unit even for long operation periods thus affording the possibility of quasicontinuous particle refuelling throughout a plasma discharge in ASDEX Upgrade. (orig.)

  18. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  19. Low mass hybrid pixel detectors for the high luminosity LHC upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gonella, Laura

    2013-10-15

    Reducing material in silicon trackers is of major importance for a good overall detector performance, and poses severe challenges to the design of the tracking system. To match the low mass constraints for trackers in High Energy Physics experiments at high luminosity, dedicated technological developments are required. This dissertation presents three technologies to design low mass hybrid pixel detectors for the high luminosity upgrades of the LHC. The work targets specifically the reduction of the material from the detector services and modules, with novel powering schemes, flip chip and interconnection technologies. A serial powering scheme is prototyped, featuring a new regulator concept, a control and protection element, and AC-coupled data transmission. A modified flip chip technology is developed for thin, large area Front-End chips, and a via last Through Silicon Via process is demonstrated on existing pixel modules. These technologies, their developments, and the achievable material reduction are discussed using the upgrades of the ATLAS pixel detector as a case study.

  20. Low mass hybrid pixel detectors for the high luminosity LHC upgrade

    International Nuclear Information System (INIS)

    Gonella, Laura

    2013-10-01

    Reducing material in silicon trackers is of major importance for a good overall detector performance, and poses severe challenges to the design of the tracking system. To match the low mass constraints for trackers in High Energy Physics experiments at high luminosity, dedicated technological developments are required. This dissertation presents three technologies to design low mass hybrid pixel detectors for the high luminosity upgrades of the LHC. The work targets specifically the reduction of the material from the detector services and modules, with novel powering schemes, flip chip and interconnection technologies. A serial powering scheme is prototyped, featuring a new regulator concept, a control and protection element, and AC-coupled data transmission. A modified flip chip technology is developed for thin, large area Front-End chips, and a via last Through Silicon Via process is demonstrated on existing pixel modules. These technologies, their developments, and the achievable material reduction are discussed using the upgrades of the ATLAS pixel detector as a case study.

  1. Upgrade of the CMS Global Muon Trigger

    CERN Document Server

    Jeitler, Manfred; Rabady, Dinyar; Sakulin, Hannes; Stahl, Achim

    2015-01-01

    The increase in center-of-mass energy and luminosity for Run-II of the Large Hadron Collider poses new challenges for the trigger systems of the experiments. To keep triggering with a similar performance as in Run-I, the CMS muon trigger is currently being upgraded. The new algorithms will provide higher resolution, especially for the muon transverse momentum and will make use of isolation criteria that combine calorimeter with muon information already in the level-1 trigger. The demands of the new algorithms can only be met by upgrading the level-1 trigger system to new powerful FPGAs with high bandwidth I/O. The processing boards will be based on the new μTCA standard. We report on the planned algorithms for the upgraded Global Muon Trigger (μGMT) which sorts and removes duplicates from boundaries of the muon trigger sub-systems. Furthermore, it determines how isolated the muon candidates are based on calorimetric energy deposits. The μGMT will be implemented using a processing board that features a larg...

  2. A high speed serializer ASIC for ATLAS Liquid Argon calorimeter upgrade

    CERN Document Server

    Liu, T; The ATLAS collaboration

    2011-01-01

    The current front-end electronics of the ATLAS Liquid Argon calorimeters need to be upgraded to sustain the higher radiation levels and data rates expected at the upgraded LHC machine (HL-LHC), which will have 5 times more luminosity than the LHC in its ultimate configuration. This upgrade calls for an optical link system of 100 Gbps per front-end board (FEB). A high speed, low power, radiation tolerant serializer is the critical component in this system. In this paper, we present the design and test results of a single channel 16:1 serializer and the design of a double-channel 16:1 serializer. Both designs are based on a commercial 0.25 μm silicon-on-sapphire CMOS technology. The single channel serializer consists of a serializing unit, a PLL clock generator and a line driver implemented in current mode logic (CML). The serializing unit multiplexes 16 bit parallel LVDS data into 1-bit width serial CMOS data. The serializing unit is composed of a cascade of 2:1 multiplexing circuits based on static D-flip-fl...

  3. The CMS Pixel Detector Upgrade and R\\&D for the High Luminosity LHC

    CERN Document Server

    Viliani, Lorenzo

    2017-01-01

    The High Luminosity Large Hadron Collider (HL-LHC) at CERN is expected to collide protons at a centre-of-mass energy of 14\\,TeV and to reach an unprecedented peak instantaneous luminosity of $5 \\times 10^{34}\\,{\\rm cm}^{-2} {\\rm s}^{-1}$ with an average number of pileup events of 140. This will allow the ATLAS and CMS experiments to collect integrated luminosities of up to $3000\\,{\\rm fb}^{-1}$ during the project lifetime. To cope with this extreme scenario the CMS detector will be substantially upgraded before starting the HL-LHC, a plan known as CMS Phase-2 Upgrade. In the upgrade the entire CMS silicon pixel detector will be replaced and the new detector will feature increased radiation hardness, higher granularity and capability to handle higher data rate and longer trigger latency. In this report the Phase-2 Upgrade of the CMS silicon pixel detector will be reviewed, focusing on the features of the detector layout and on the development of new pixel devices.

  4. High Resolution BPM Upgrade for the ATF Damping Ring at KEK

    International Nuclear Information System (INIS)

    Eddy, N.; Briegel, C.; Fellenz, B.; Gianfelice-Wendt, E.; Prieto, P.; Rechenmacher, R.; Semenov, A.; Voy, D.; Wendt, M.; Zhang, D.; Terunuma, N.

    2011-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facility (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution (∼100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.

  5. The LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Dosil Suárez, Álvaro, E-mail: alvaro.dosil@usc.es

    2016-07-11

    The upgrade of the LHCb experiment, planned for 2019, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm. The upgraded detector will run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1} and probe physics beyond the Standard Model in the heavy flavour sector with unprecedented precision. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The detector comprises silicon pixel sensors with 55×55 μm{sup 2} pitch, read out by the VeloPix ASIC, based on the TimePix/MediPix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The detector halves are retracted when the beams are injected and closed at stable beams, positioning the first sensitive pixel at 5.1 mm from the beams. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates.

  6. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    Science.gov (United States)

    Tortajada, Ignacio Asensi

    2018-01-01

    The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. The Tile Calorimeter (TileCal) will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and then transferred directly to the off-detector electronics, where the signals will be reconstructed, stored, and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Changes to the electronics will also contribute to the reliability and redundancy of the system. Three different front-end options are presently being investigated for the upgrade, two of them based on ASICs, and a final solution will be chosen after extensive laboratory and test beam studies that are in progress. A hybrid demonstrator module is being developed using the new electronics while conserving compatibility with the current system. The status of the developments will be presented, including results from the several tests with particle beams.

  7. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). The PMT signals are digitized and stored on detector until a trigger is received. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and then transferred directly to the off-detector electronics, where the signals will be reconstructed, stored, and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals...

  8. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    CERN Document Server

    Hildebrand, Kevin; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter is the hadronic calorimeter covering the central region of the ATLAS detector at the Large Hadron Collider. It is a scintillator-steel sampling calorimeter read out via wavelength shifting fibers coupled to photomultiplier tubes (PMT). . The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade (2024-2025) will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. In the new architecture, all signals will be digitized and sent to the first level of trigger at the rate of 40 MHz. This will provide better precision of the calorimeter signals used by the trigger system and will allow the development of more complex trigger algorithms. Changes to the electronics will also contribute to the reliability and redundancy of the system. ...

  9. Feedback controlled, reactor relevant, high-density, high-confinement scenarios at ASDEX Upgrade

    Science.gov (United States)

    Lang, P. T.; Blanken, T. C.; Dunne, M.; McDermott, R. M.; Wolfrum, E.; Bobkov, V.; Felici, F.; Fischer, R.; Janky, F.; Kallenbach, A.; Kardaun, O.; Kudlacek, O.; Mertens, V.; Mlynek, A.; Ploeckl, B.; Stober, J. K.; Treutterer, W.; Zohm, H.; ASDEX Upgrade Team

    2018-03-01

    One main programme topic at the ASDEX Upgrade all-metal-wall tokamak is development of a high-density regime with central densities at reactor grade level while retaining high-confinement properties. This required development of appropriate control techniques capable of coping with the pellet tool, a powerful means of fuelling but one which presented challenges to the control system for handling of related perturbations. Real-time density profile control was demonstrated, raising the core density well above the Greenwald density while retaining the edge density in order to avoid confinement losses. Recently, a new model-based approach was implemented that allows direct control of the central density. Investigations focussed first on the N-seeding scenario owing to its proven potential to yield confinement enhancements. Combining pellets and N seeding was found to improve the divertor buffering further and enhance the operational range accessible. For core densities up to about the Greenwald density, a clear improvement with respect to the non-seeding reference was achieved; however, at higher densities this benefit is reduced. This behaviour is attributed to recurrence of an outward shift of the edge density profile, resulting in a reduced peeling-ballooning stability. This is similar to the shift seen during strong gas puffing, which is required to prevent impurity influx in ASDEX Upgrade. First tests indicate that highly-shaped plasma configurations like the ITER base-line scenario, respond very well to pellet injection, showing efficient fuelling with no measurable impact on the edge density profile.

  10. Research program of the high temperature engineering test reactor for upgrading the HTGR technology

    International Nuclear Information System (INIS)

    Kunitomi, Kazuhiko; Tachibana, Yukio; Takeda, Takeshi; Saikusa, Akio; Sawa, Kazuhiro

    1997-07-01

    The High Temperature Engineering Test Reactor (HTTR) is a graphite-moderated and helium-cooled reactor with an outlet power of 30 MW and outlet coolant temperature of 950degC, and its first criticality will be attained at the end of 1997. In the HTTR, researches establishing and upgrading the technology basis necessary for an HTGR and innovative basic researches for a high temperature engineering will be conducted. A research program of the HTTR for upgrading the technology basis for the HTGR was determined considering realization of future generation commercial HTGRs. This paper describes a research program of the HTTR. (author)

  11. The CMS Data Acquisition - Architectures for the Phase-2 Upgrade

    CERN Document Server

    Andre, Jean-Marc Olivier; Branson, James; Brummer, Philipp Maximilian; Chaze, Olivier; Cittolin, Sergio; Contescu, Cristian; Craigs, Benjamin Gordon; Darlea, Georgiana Lavinia; Deldicque, Christian; Demiragli, Zeynep; Dobson, Marc; Doualot, Nicolas; Erhan, Samim; Fulcher, Jonathan F; Gigi, Dominique; Michail Gladki; Glege, Frank; Gomez Ceballos, Guillelmo; Hegeman, Jeroen Guido; Holzner, Andre Georg; Janulis, Mindaugas; Jimenez Estupinan, Raul; Masetti, Lorenzo; Meijers, Franciscus; Meschi, Emilio; Mommsen, Remigius; Morovic, Srecko; O'Dell, Vivian; Orsini, Luciano; Paus, Christoph Maria Ernst; Petrova, Petia; Pieri, Marco; Racz, Attila; Reis, Thomas; Sakulin, Hannes; Schwick, Christoph; Simelevicius, Dainius; Zejdl, Petr

    2017-01-01

    The upgraded High Luminosity LHC, after the third Long Shutdown (LS3), will provide an instantaneous luminosity of $7.5\\times10^{34}$ cm$^{-2} s^{-1}$ (levelled), at the price of extreme pileup of up to 200 interactions per crossing. In LS3, the CMS Detector will also undergo a major upgrade to prepare for the phase-2 of the LHC physics program, starting around 2025. The upgraded detector will be read out at an unprecedented data rate of up to 50 Tb/s and an event rate of 750 kHz. Complete events will be analysed by software algorithms running on standard processing nodes, and selected events will be stored permanently at a rate of up to 10 kHz for offline processing and analysis. In this paper we discuss the baseline design of the DAQ and HLT systems for the phase-2, taking into account the projected evolution of high speed network fabrics for event building and distribution, and the anticipated performance of general purpose CPU. Implications on hardware and infrastructure requirements for the DAQ "data cen...

  12. Surveillance programme and upgrading of the High Flux Reactor Petten

    International Nuclear Information System (INIS)

    Bieth, Michel

    1995-01-01

    The High Flux Reactor (HFR) at Petten (The Netherlands), a 45 MW light water cooled and moderated research reactor in operation during more than 30 years, has been kept up to date by replacing ageing components. In 1984, the HFR was shut down for replacement of the aluminium. reactor vessel which had been irradiated during more than 20 years. The demonstration that the new vessel contains no critical defect requires knowledge of the material properties of the aluminium alloy Al 5154 with and without neutron irradiation and of the likely defect presence through the periodic in-service inspections. An irradiation damage surveillance programme has been started in 1985 for the new vessel material to provide information on fracture mechanics properties. After the vessel replacement, the existing process of continuous upgrading and replacement of ageing components was accelerated. A stepwise upgrade of the control room is presently under realization. (author)

  13. Surveillance programme and upgrading of the High Flux Reactor Petten

    Energy Technology Data Exchange (ETDEWEB)

    Bieth, Michel [Commission of the European Communities, Joint Research Centre, Institute for Advanced Materials, High Flux Reactor Unit, Petten (Netherlands)

    1995-07-01

    The High Flux Reactor (HFR) at Petten (The Netherlands), a 45 MW light water cooled and moderated research reactor in operation during more than 30 years, has been kept up to date by replacing ageing components. In 1984, the HFR was shut down for replacement of the aluminium. reactor vessel which had been irradiated during more than 20 years. The demonstration that the new vessel contains no critical defect requires knowledge of the material properties of the aluminium alloy Al 5154 with and without neutron irradiation and of the likely defect presence through the periodic in-service inspections. An irradiation damage surveillance programme has been started in 1985 for the new vessel material to provide information on fracture mechanics properties. After the vessel replacement, the existing process of continuous upgrading and replacement of ageing components was accelerated. A stepwise upgrade of the control room is presently under realization. (author)

  14. Colorado River Sewer System Joint Venture to Upgrade Wastewater System

    Science.gov (United States)

    SAN FRANCISCO -Today, the Colorado River Sewer System Joint Venture, located in Parker, Ariz. entered into an agreement with the EPA to upgrade their wastewater treatment system to meet stringent water quality standards. The cost of the upgrade is ap

  15. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  16. SLHC, the high-luminosity upgrade (public event)

    CERN Multimedia

    CERN. Geneva

    2009-01-01

    In the morning of February 26th a public event is organised in CERN's main auditorium with the aim of informing the particle physics community about the current status of preparation work for the future LHC luminosity upgrade (Phase 1 and Phase 2). The presentations will provide an overview of the various accelerator sub-projects, the physics potential and the experiment upgrade plans. This event is organised in the framework of the SLHC-PP project, which receives funding from the European Commission for the preparatory phase of the SLHC project. Informing the public about the overall status of SLHC is among the objectives of this EU-funded project. A simultaneous transmission of this meeting will be broadcast, available at the following address: http://webcast.cern.ch/

  17. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Asensi Tortajada, Ignacio; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized at 40 MHz and stored on detector and are only transferred off detector once the first level trigger acceptance has been confirmed (at a rate of maximum 100 kHz). The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the upgrade of the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and of...

  18. Scientific upgrades at the high flux isotope reactor at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Selby, D.L.; Garrett, D.L.; Lucas, A.T.; Reeves, M.E.

    2001-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high flux isotope reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: 1) larger beam tubes, 2) a new monochromator drum for the HB-1 beam line, 3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, 4) new instruments for the HB-2 beamline, 5) a new monochromator drum for the HB-3 beam line, 6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, 7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, 8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, 9) a number of new instruments for the cold beams including two new SANS instruments, and 10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule. (orig.)

  19. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  20. Biogas Upgrading and Waste-to-Energy | Bioenergy | NREL

    Science.gov (United States)

    Biogas Upgrading and Waste-to-Energy Biogas Upgrading and Waste-to-Energy NREL's waste-to-energy research and development required for upgrading biogas to fuels and high-value co-products. Featured (2014) Biogas Potential in the United States, NREL Fact Sheet (2013) View all NREL biogas upgrading and

  1. Upgrade of pipelines operated in a Polish conditions in accordance with European Standards

    International Nuclear Information System (INIS)

    Witek, M.

    2007-01-01

    This paper presents some aspects of changing polish technical requirements concerning high pressure gas pipelines in accordance with European Norm 1594 '' Gas supply system. Pipelines with maximum operating pressure over 16 bar. Functional requirements ''. An additional class location of the steel pipelines was analyzed and supported by the results on numerous pipeline cases in Poland. Minimum distances between pipelines and buildings are given as a proposal to upgrading polish technical law in the area of the gas grid. Special attention in analysis was given to the polish existing high pressure gas network and calculation examples of existing types of steel used in pipeline construction in the past. (author)

  2. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  3. Nb3Sn High Field Magnets for the High Luminosity LHC Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Ambrosio, Giorgio

    2015-06-01

    The High Luminosity upgrade of the Large Hadron Collider at CERN requires a new generation of high field superconducting magnets. High field large aperture quadrupoles (MQXF) are needed for the low-beta triplets close to the ATLAS and CMS detectors, and high field two-in-one dipoles (11 T dipoles) are needed to make room for additional collimation. The MQXF quadrupoles, with a field gradient of 140 T/m in 150 mm aperture, have a peak coil field of 12.1 T at nominal current. The 11 T dipoles, with an aperture of 60 mm, have a peak coil field of 11.6 T at nominal current. Both magnets require Nb3Sn conductor and are the first applications of this superconductor to actual accelerator magnets.

  4. AGS intensity upgrades

    International Nuclear Information System (INIS)

    Roser, T.

    1995-01-01

    After the successful completion of the AGS Booster and several upgrades of the AGS, a new intensity record of 6.3 x 10 13 protons per pulse accelerated to 24 GeV was achieved. The high intensity slow-extracted beam program at the AGS typically serves about five production targets and about eight experiments including three rare Kaon decay experiments. Further intensity upgrades are being discussed that could increase the average delivered beam intensity by up to a factor of four

  5. Social and health outcomes following upgrades to a national housing standard: a multilevel analysis of a five-wave repeated cross-sectional survey.

    Science.gov (United States)

    Poortinga, Wouter; Jones, Nikki; Lannon, Simon; Jenkins, Huw

    2017-12-02

    While existing research indicates that housing improvements are associated with health improvements, less is known about the wider social and health benefits of meeting national housing standards, as well as those of their specific constituent measures. This study evaluates the impacts of a managed housing upgrade programme through a repeated cross-sectional survey design. A five-wave repeated cross-sectional survey was conducted over a seven-year period from 2009 to 2016 (n = 2075; n = 2219; n = 2015; n = 1991; and n = 1709, respectively). The study followed a managed upgrade programme designed to meet a national social housing standard over an extended period. The data were analysed from a multilevel perspective to take account of the time-dependent nature of the observations and differences in socio-demographic composition. The installation of the majority of individual housing measures (new windows and doors; boilers; kitchens; bathrooms; electrics; loft insulation; and cavity/external wall insulation) were associated with improvements in several social (housing suitability, satisfaction, and quality; thermal comfort and household finances) and health (mental, respiratory and general health) outcomes; and analyses showed relationships between the number of measures installed and the total amount invested on the one hand and the social and health outcomes on the other. There were however a few exceptions. Most notably, the installation of cavity wall insulation was associated with poorer health outcomes, and did not lead to better social outcomes. Also, no association was found between the number of measures installed and respiratory health. The study suggests that substantial housing investments through a managed upgrade programme may result in better social and health outcomes, and that the size of the improvements are proportionate to the number of measures installed and amount invested. However, there may be risks associated with specific

  6. Seismic upgrading of the Brookhaven High Flux Beam Research Reactor

    International Nuclear Information System (INIS)

    Subudhi, M.

    1985-01-01

    In recent years the High Flux Beam Research (HFBR) reactor facility at Brookhaven National Laboratory (BNL) was upgraded from 40 to 50 MW power level. The reactor plant was built in the early sixties to the seismic design requirements of the period, using the static load approach. While the plant power level was upgraded, the seismic design was also improved according to current design criteria. This included the development of new floor response spectra for the facility and an overall seismic analysis of those systems important to the safe shutdown of the reactor. Items included in the reanalysis are the containment building with its internal structure, the piping systems, tanks, equipment, and heat exchangers. This paper describes the procedure utilized in developing the floor response spectra for the existing facility. Also included in the paper are the findings and recommendations, based on the seismic analysis, regarding the seismic adequacy of structural and mechanical systems vital to achieving the safe shutdown of the reactor. 11 references, 4 figures, 1 table

  7. Operational limits of high density H-modes in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Mertens, V.; Borrass, K.; Kaufmann, M.; Lang, P.T.; Lang, R.; Mueller, H.W.; Neuhauser, J.; Schneider, R.; Schweinzer, J.; Suttrop, W.

    2001-01-01

    Systematic investigations of H-mode density limit (H→L-mode back transition) plasmas with gas fuelling and alternatively with additional pellet injection from the magnetic high-field-side HFS are being performed in the new closed divertor configuration DV-II. The resulting database covering a wide range of the externally controllable plasma parameters I p , B t and P heat confirms that the H-mode threshold power exceeds the generally accepted prediction P L→H heat ∝B-bar t dramatically when one approaches Greenwald densities. Additionally, in contrast to the Greenwald scaling a moderate B t -dependence of the H-mode density limit is found. The limit is observed to coincide with divertor detachment and a strong increase of the edge thermal transport, which has, however, no detrimental effect on global τ E . The pellet injection scheme from the magnetic high-field-side HFS, developed recently on ASDEX Upgrade, leads to fast particle drifts which are, contrary to the standard injection from the low-field-side, directed into the plasma core. This improves markedly the pellet particle fuelling efficiency. The responsible physical mechanism, the diamagnetic particle drift of the pellet ablatant was successfully verified recently. Other increased particle losses on respectively different time scales after the ablation process, however, still persist. Generally, a clear gain in achievable density and plasma stored energy is achieved with stationary HFS pellet injection compared to gas-puffing. (author)

  8. Safety upgrading program in NPP Mochovce

    International Nuclear Information System (INIS)

    Baumeister, P.

    1999-01-01

    EMO interest is to operate only nuclear power plants with high standards of nuclear safety. This aim EMO declare on preparation completion and commissioning of Mochovce Nuclear Power Plant. Wide co-operation of our company with International Atomic Energy Agency and west European Inst.ions and companies has been started with aim to fulfil the nuclear safety requirements for Mochovce NPP. Set of 87 safety measures was implemented at Mochovce Unit 1 and is under construction at Unit 2. Mochovce NPP approach to safety upgrading implementation is showed on chosen measures. This presentation is focused on the issues category III.(author)

  9. Upgrades toward high-heat flux, liquid lithium plasma-facing components in the NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Jaworski, M.A., E-mail: mjaworsk@pppl.gov [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Brooks, A.; Kaita, R. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Lopes-Cardozo, N. [TU/Eindhoven, Eindhoven (Netherlands); Menard, J.; Ono, M. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Rindt, P. [TU/Eindhoven, Eindhoven (Netherlands); Tresemer, K. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States)

    2016-11-15

    Highlights: • An upgrade path for the NSTX-U tokamak is proposed that maintains scientific productivity while enabling exploration of novel, liquid metal PFC. • Pre-filled liquid metal divertor targets are proposed as an intermediate step that mitigates technical and scientific risks associated with liquid metal PFC. • Analysis of leading edge features show a strong link between engineering design considerations and expected performance as a PFC. • A method for optimizing porous liquid metal targets restrained by capillary forces is provided indicating pore-sizes well within current technical capabilities. - Abstract: Liquid metal plasma-facing components (PFCs) provide numerous potential advantages over solid-material components. One critique of the approach is the relatively less developed technologies associated with deploying these components in a fusion plasma-experiment. Exploration of the temperature limits of liquid lithium PFCs in a tokamak divertor and the corresponding consequences on core operation are a high priority informing the possibilities for future liquid lithium PFCs. An all-metal NSTX-U is envisioned to make direct comparison between all high-Z wall operation and liquid lithium PFCs in a single device. By executing the all-metal upgrades incrementally, scientific productivity will be maintained while enabling physics and engineering-science studies to further develop the solid- and liquid-metal components. Six major elements of a flowing liquid-metal divertor system are described and a three-step program for implementing this system is laid out. The upgrade steps involve the first high-Z divertor target upgrade in NSTX-U, pre-filled liquid metal targets and finally, an integrated, flowing liquid metal divertor target. Two example issues are described where the engineering and physics experiments are shown to be closely related in examining the prospects for future liquid metal PFCs.

  10. High Temperature Calcination - MACT Upgrade Equipment Pilot Plant Test

    Energy Technology Data Exchange (ETDEWEB)

    Richard D. Boardman; B. H. O& #39; Brien; N. R. Soelberg; S. O. Bates; R. A. Wood; C. St. Michel

    2004-02-01

    About one million gallons of acidic, hazardous, and radioactive sodium-bearing waste are stored in stainless steel tanks at the Idaho Nuclear Technology and Engineering Center (INTEC), which is a major operating facility of the Idaho National Engineering and Environmental Laboratory. Calcination at high-temperature conditions (600 C, with alumina nitrate and calcium nitrate chemical addition to the feed) is one of four options currently being considered by the Department of Energy for treatment of the remaining tank wastes. If calcination is selected for future processing of the sodium-bearing waste, it will be necessary to install new off-gas control equipment in the New Waste Calcining Facility (NWCF) to comply with the Maximum Achievable Control Technology (MACT) standards for hazardous waste combustors and incinerators. This will require, as a minimum, installing a carbon bed to reduce mercury emissions from their current level of up to 7,500 to <45 {micro}g/dscm, and a staged combustor to reduce unburned kerosene fuel in the off-gas discharge to <100 ppm CO and <10 ppm hydrocarbons. The staged combustor will also reduce NOx concentrations of about 35,000 ppm by 90-95%. A pilot-plant calcination test was completed in a newly constructed 15-cm diameter calciner vessel. The pilot-plant facility was equipped with a prototype MACT off-gas control system, including a highly efficient cyclone separator and off-gas quench/venturi scrubber for particulate removal, a staged combustor for unburned hydrocarbon and NOx destruction, and a packed activated carbon bed for mercury removal and residual chloride capture. Pilot-plant testing was performed during a 50-hour system operability test January 14-16, followed by a 100-hour high-temperature calcination pilot-plant calcination run January 19-23. Two flowsheet blends were tested: a 50-hour test with an aluminum-to-alkali metal molar ratio (AAR) of 2.25, and a 50-hour test with an AAR of 1.75. Results of the testing

  11. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  12. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  13. Upgrade of the AGS H- linac

    International Nuclear Information System (INIS)

    Alessi, J.G.; Buxton, W.; Kponou, A.; LoDestro, V.; Mapes, M.; McNerney, A.J.; Raparia, D.

    1994-01-01

    The AGS linac presently accelerates 25 mA of H - to 200 MeV at a 5 Hz rep-rate and 500 μs pulse width. The Booster takes 4 pulses every 3.8 seconds, and the remaining pulses are used for isotope production. The authors are in the process of upgrading the linac to increase the average current delivered for isotope production by more than a factor of two, while at the same time expecting to decrease linac downtime. Various aspects of this upgrade are discussed, including the upgrade of the control system, new high power transmission line, transport line vacuum, and rf power supply system upgrades

  14. Influence of the seasonal variation of environmental conditions on biogas upgrading in an outdoors pilot scale high rate algal pond.

    Science.gov (United States)

    Marín, David; Posadas, Esther; Cano, Patricia; Pérez, Víctor; Lebrero, Raquel; Muñoz, Raúl

    2018-05-01

    The influence of the daily and seasonal variations of environmental conditions on the quality of the upgraded biogas was evaluated in an outdoors pilot scale high rate algal pond (HRAP) interconnected to an external absorption column (AC) via a conical settler. The high alkalinity in the cultivation broth resulted in a constant biomethane composition during the day regardless of the monitored month, while the high algal-bacterial activity during spring and summer boosted a superior biomethane quality. CO 2 concentrations in the upgraded biogas ranged from 0.1% in May to 11.6% in December, while a complete H 2 S removal was always achieved regardless of the month. A limited N 2 and O 2 stripping from the scrubbing cultivation broth was recorded in the upgraded biogas at a recycling liquid/biogas ratio in the AC of 1. Finally, CH 4 concentration in the upgraded biogas ranged from 85.6% in December to 99.6% in August. Copyright © 2018 Elsevier Ltd. All rights reserved.

  15. Upgrade of 400,000 gallon water storage tank at Argonne National Laboratory-West to UCRL-15910 high hazard seismic requirements

    International Nuclear Information System (INIS)

    Griffin, M.J.; Harris, B.G.

    1993-01-01

    As part of the Integral Fast Reactor (IFR) Project at Argonne National Laboratory West (ANL-W), it was necessary to strengthen an existing 400,000 gallon flat-bottom water storage tank to meet UCRL-15910 (currently formulated as DOE Standard DOE-STD-1020-92, Draft) high hazard natural phenomena requirements. The tank was constructed in 1988 and preliminary calculations indicated that the existing base anchorage was insufficient to prevent buckling and potential failure during a high hazard seismic event. General design criteria, including ground motion input, load combinations, etc., were based upon the requirements of UCRL-15910 for high hazard facilities. The analysis and capacity assessment criteria were based on the Generic Implementation Procedure developed by the Seismic Qualification Utilities Group (SQUG). Upgrade modifications, consisting of increasing the size of the Generic Implementation Procedure developed by the Seismic Qualification Utilities Group (SQUG). Upgrade modifications, consisting of increasing the size of the foundation and installing additional anchor bolts and chairs, were necessary to increase the capacity of the tank anchorage/support system. The construction of the upgrades took place in 1992 while the tank remained in service to allow continued operation of the EBR-II reactor. The major phases of construction included the installation and testing of 144 1/14in. x 15in., and 366 1in. x 16in. epoxied concrete anchors, placement of 220 cubic yards of concrete heavily reinforced, and installation of 24 1-1/2in. x 60in. tank anchor bolts and chairs. A follow-up inspection of the tank interior by a diver was conducted to determine if the interior tank coating had been damaged by the chair welding. The project was completed on schedule and within budget

  16. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    CERN Document Server

    Cerqueira, A S

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase~0 occurs during 2013-2014, Phase~1 during 2018-1019 and finally Phase~2, which is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 10$^{34}$ cm$^2$s$^{-1}$ (HL-LHC). The main TileCal upgrade is focused on the Phase~2 period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased radiation levels. An ambitious upgrade development program is pursued to study different electronics options. Three options are presently being investigated for the front-end electronic upgrade. The first option is an improved version of the present system built using comm...

  17. Upgrading the standard makeup node at the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Charvat, L.; Dvorak, J.

    1999-01-01

    Modifications made on the normal makeup and boron control system of the Dukovany nuclear power plant in 1997 and 1998 are described. The reasons for and objectives of the upgrading are highlighted in relation to the reliability of the facility and maintenance cost of the system. (author)

  18. CMS Calorimeter Trigger Phase I upgrade

    International Nuclear Information System (INIS)

    Klabbers, P; Gorski, T; Bachtis, M; Dasu, S; Fobes, R; Grothe, M; Ross, I; Smith, W H; Compton, K; Farmahini-Farahani, A; Gregerson, A; Seemuth, D; Schulte, M

    2012-01-01

    We present a design for the Phase-1 upgrade of the Compact Muon Solenoid (CMS) calorimeter trigger system composed of FPGAs and Multi-GBit/sec links that adhere to the μTCA crate Telecom standard. The upgrade calorimeter trigger will implement algorithms that create collections of isolated and non-isolated electromagnetic objects, isolated and non-isolated tau objects and jet objects. The algorithms are organized in several steps with progressive data reduction. These include a particle cluster finder that reconstructs overlapping clusters of 2x2 calorimeter towers and applies electron identification, a cluster overlap filter, particle isolation determination, jet reconstruction, particle separation and sorting.

  19. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Oreglia, M; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The main upgrade will occur for the High Luminosity LHC phase (phase 2) which is scheduled around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to use will be decided after extensive test beam studies. High speed optical links are used to read out all digitized data to the counting room. For the off-detector electronics a new back-end architecture is being developed, including the initial trigger processing and pipeline memories. A demonstrator prototype read-out for a slice of the ...

  20. Upgrades of the ATLAS trigger system

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2018-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. \\\\ By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions ...

  1. ATLAS Upgrade Programme

    CERN Document Server

    Hillier, S J; The ATLAS collaboration

    2012-01-01

    With the already outstanding LHC luminosity performance, and planned LHC upgrades in the upcoming shutdowns, it is expected that within a short time-scale, the general purpose LHC experiments will have to cope with luminosities beyond their original design. In order to maintain detector performance and sensitivity to expected and new physics processes, ATLAS has defined a continuous upgrade programme which foresees staged enhancements during the next 10 years of operation, and then more widespread changes before the transition to the highest luminosities after 2022. This talk will describe several components of the ATLAS upgrade, focusing in particular on the Inner Detector and Trigger. The Inner Detector faces two challenges in the higher luminosity environment: high particle multiplicities and increased radiation dose. These will be addressed in the short term by a new layer of Pixel detectors, and in the long term by a complete replacement. The Trigger faces an increasingly difficult task of distinguishing...

  2. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  3. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  4. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  5. The D0 upgrade

    International Nuclear Information System (INIS)

    Tuts, P.M.

    1992-10-01

    The original D0 detector was proposed in 1983, with a focus on high P T physics using precision measurements of e's, μ's, jets, and missing E T . This detector, as of the summer of 1992, has started data taking at the Fermilab Collider. However, by 1995/6 the luminosity will reach 10 31 cm -2 sec -1 , and the minimum bunch spacing will drop to 396ns from the present 3.5μs (by the Main Injector era, luminosities will approach 10 32 cm -2 sec -1 and minimum bunch spacings may reach 132ns). These changes in the accelerator conditions force us to upgrade or replace a number of detector subsystems in order to meet these new demands. In addition, the upgrade offers us the opportunity to expand the physics horizons to include not only the all important high P T physics menu, but also the low P T physics that has become increasingly important. In this paper we describe the D0 detector upgrade

  6. Cost-effectiveness of ASHRAE Standard 90.1-2010 Compared to ASHRAE Standard 90.1-2007

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, Brian A.; Halverson, Mark A.; Myer, Michael; Cho, Hee Jin; Loper, Susan A.; Richman, Eric E.; Elliott, Douglas B.; Mendon, Vrushali V.; Rosenberg, Michael I.

    2013-06-18

    Pacific Northwest National Laboratory (PNNL) completed this project for the U.S. Department of Energy’s (DOE’s) Building Energy Codes Program (BECP). DOE’s BECP supports upgrading building energy codes and standards, and the states’ adoption, implementation, and enforcement of upgraded codes and standards. Building energy codes and standards set minimum requirements for energy-efficient design and construction for new and renovated buildings, and impact energy use and greenhouse gas emissions for the life of buildings. Continuous improvement of building energy efficiency is achieved by periodically upgrading energy codes and standards. Ensuring that changes in the code that may alter costs (for building components, initial purchase and installation, replacement, maintenance and energy) are cost-effective encourages their acceptance and implementation. ANSI/ASHRAE/IESNA Standard 90.1 is the energy standard for commercial and multi-family residential buildings over three floors.

  7. High selectivity and stability of Mg-doped Al-MCM-41 for in-situ catalytic upgrading fast pyrolysis bio-oil

    International Nuclear Information System (INIS)

    Karnjanakom, Surachai; Suriya-umporn, Thanyamai; Bayu, Asep; Kongparakul, Suwadee; Samart, Chanatip; Fushimi, Chihiro; Abudula, Abuliti; Guan, Guoqing

    2017-01-01

    Highlights: • Mg-doped Al-MCM-41 was developed for in-situ catalytic upgrading of bio-oils. • Mg/Al-MCM-41 exhibited high selectivity to aromatic hydrocarbons. • The ratio of produced hydrocarbon reached up to 80% in upgraded bio-oil. • 1 wt.% Mg/Al-MCM-41 showed the highest catalytic activity. • Mg/Al-MCM-41 had stable reusability due to its coking inhabitation ability. - Abstract: In-situ catalytic upgrading of bio-oils derived from the fast pyrolysis of cellulose, lignin or sunflower stalk over Mg-doped Al-MCM-41 was investigated in details. It is found that Mg species with doping amounts ranged between 0.25 and 10 wt.% was well dispersed on Al-MCM-41, and that doping Mg on Al-MCM-41 effectively adjusted the acidity and basicity of the catalysts, resulting in significant improvement of bio-oil quality. Mg/Al-MCM-41 exhibited high selective conversion of bio-oils derived from cellulose, lignin or sunflower stalk to high value-added aromatic hydrocarbons via catalytic cracking, deoxygenation and aromatization. In the upgraded bio-oil, the relative total hydrocarbon amount reached up to approximately ≥80%, which consisted of aromatic hydrocarbon approximately 76% and aliphatic hydrocarbon approximately 4% for all feedstocks. The selectivity to the monocyclic aromatic hydrocarbons (MAHs) such as benzene, toluene and xylenes (BTXs) increased while the coke formed on the catalyst decreased with the increase in Mg doping amount. 1 wt.% Mg/Al-MCM-41 resulted in the highest relative total hydrocarbon amount in the upgraded bio-oil at lower catalytic deoxygenation temperature, and showed stable reusability for at least 5 cycles. It is expected that Mg/Al-MCM-41 can be widely applied for bio-oil upgrading in a practical process.

  8. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Carrio, F; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the luminosity will have increased 5-fold compared to the design luminosity (1034 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional luminosity increase by a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2022. The upgrade aims at replacing the majority of the on- and off- detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. An ambitious upgrade development program is pursued studying different electronics options. Three different options are presently being investigated for the front-end electronic upgrade. Which one to u...

  9. A Silicon Strip Detector for the Phase II High Luminosity Upgrade of the ATLAS Detector at the Large Hadron Collider

    CERN Document Server

    INSPIRE-00425747; McMahon, Stephen J

    2015-01-01

    ATLAS is a particle physics experiment at the Large Hadron Collider (LHC) that detects proton-proton collisions at a centre of mass energy of 14 TeV. The Semiconductor Tracker is part of the Inner Detector, implemented using silicon microstrip detectors with binary read-out, providing momentum measurement of charged particles with excellent resolution. The operation of the LHC and the ATLAS experiment started in 2010, with ten years of operation expected until major upgrades are needed in the accelerator and the experiments. The ATLAS tracker will need to be completely replaced due to the radiation damage and occupancy of some detector elements and the data links at high luminosities. These upgrades after the first ten years of operation are named the Phase-II Upgrade and involve a re-design of the LHC, resulting in the High Luminosity Large Hadron Collider (HL-LHC). This thesis presents the work carried out in the testing of the ATLAS Phase-II Upgrade electronic systems in the future strips tracker a...

  10. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00236332; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. An analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitized and then...

  11. Upgrade of the ATLAS hadronic Tile calorimeter for the High luminosity LHC

    CERN Document Server

    Mlynarikova, Michaela; The ATLAS collaboration

    2017-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS detector at the LHC. It is a sampling calorimeter consisting of alternating thin steel plates and scintillating tiles. Wavelength shifting fibers coupled to the tiles collect the produced light and are read out by photomultiplier tubes. Currently, an analog sum of the processed signal of several photomultipliers serves as input to the first level of trigger. Photomultiplier signals are then digitized and stored on detector and are only transferred off detector once the first trigger acceptance has been confirmed. The Large Hadron Collider (LHC) has envisaged a series of upgrades towards a High Luminosity LHC (HL-LHC) delivering five times the LHC nominal instantaneous luminosity. The ATLAS Phase II upgrade, in 2024, will accommodate the detector and data acquisition system for the HL-LHC. In particular, TileCal will undergo a major replacement of its on- and off-detector electronics. All signals will be digitiz...

  12. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  13. LHCb VELO Upgrade

    CERN Document Server

    Hennessy, Karol

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of $2\\times10^{33} \\mathrm{cm}^{-2}\\mathrm{s}^{-1}$. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have $55\\times55 \\mu m^{2}$ pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separate...

  14. ATLAS Upgrade Plans

    CERN Document Server

    Hopkins, W; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000/fb by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new...

  15. National Cost-effectiveness of ASHRAE Standard 90.1-2010 Compared to ASHRAE Standard 90.1-2007

    Energy Technology Data Exchange (ETDEWEB)

    Thornton, Brian; Halverson, Mark A.; Myer, Michael; Loper, Susan A.; Richman, Eric E.; Elliott, Douglas B.; Mendon, Vrushali V.; Rosenberg, Michael I.

    2013-11-30

    Pacific Northwest National Laboratory (PNNL) completed this project for the U.S. Department of Energy’s (DOE’s) Building Energy Codes Program (BECP). DOE’s BECP supports upgrading building energy codes and standards, and the states’ adoption, implementation, and enforcement of upgraded codes and standards. Building energy codes and standards set minimum requirements for energy-efficient design and construction for new and renovated buildings, and impact energy use and greenhouse gas emissions for the life of buildings. Continuous improvement of building energy efficiency is achieved by periodically upgrading energy codes and standards. Ensuring that changes in the code that may alter costs (for building components, initial purchase and installation, replacement, maintenance and energy) are cost-effective encourages their acceptance and implementation. ANSI/ASHRAE/IESNA Standard 90.1 is the energy standard for commercial and multi-family residential buildings over three floors.

  16. A large divertor manipulator for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Herrmann, Albrecht, E-mail: albrecht.herrmann@ipp.mpg.de; Jaksic, Nikola; Leitenstern, Peter; Greuner, Henri; Krieger, Karl; Marné, Pascal de; Oberkofler, Martin; Rohde, Volker; Schall, Gerd

    2015-10-15

    Highlights: • A large divertor manipulator for ASDEX Upgrade is developed and tested. • It allows replacing a relevant part of the divertor by dedicated targets and probes. • Modified solid standard targets. • Electrical and mechanical probes for dedicated investigations. • Test of actively cooled component. - Abstract: In 2013 a new bulk tungsten divertor, Div-III, was installed in ASDEX Upgrade (AUG). During the concept and design phase of Div-III the option of adaptable divertor instrumentation and divertor modification as contribution for divertor investigations in preparation of ITER was given a high priority. To gain flexibility for the test of divertor modifications without affecting the operational space of AUG, the large divertor manipulator, DIM-II, was designed and installed. DIM-II allows to retract 2 out of 128 outer divertor target tiles including the water cooled support structure into a target exchange box and to replace these targets without breaking the vacuum of the AUG vessel. DIM-II is based on a carriage-rail system with a driving rod pushing a front-end with the target module into the divertor position for plasma operation. Three types of front-ends are foreseen for physics investigations: (i) modified standard targets clamped to the standard cooling structure, (ii) dedicated front-ends making use of the whole available volume of about 230 × 160 × 80 mm{sup 3} and (iii) actively cooled/heated targets for cooling water temperatures up to 230 °C. This paper presents the DIM-II design including the FEM calculations for the modified divertor support structure and the front-end options, as well as the test procedure and operation mode.

  17. The US Department of Energy Personnel Dosimetry Evaluation and Upgrade Program

    International Nuclear Information System (INIS)

    Faust, L.G.; Stroud, C.M.; Swinth, K.L.; Vallario, E.J.

    1987-11-01

    The US Department of Energy (DOE) Personnel Dosimetry Evaluation and Upgrade Program is designed to identify and evaluate dosimetry deficiencies and to conduct innovative research and development programs that will improve overall capabilities, thus ensuring that DOE can comply with applicable standards and regulations for dose measurement. To achieve these goals, two programs were initiated to evaluate and upgrade beta measurement and neutron dosimetry. 3 refs

  18. DAQ Architecture for the LHCb Upgrade

    International Nuclear Information System (INIS)

    Liu, Guoming; Neufeld, Niko

    2014-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2 × 10 33 cm −2 s −1 . The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of LHCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of ∼ 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and relative cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ system.

  19. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2013-01-01

    The three post-LS1 Phase 1 Upgrade projects (the L1-Trigger, Pixel Tracker, and HCAL) are all making excellent progress and are transitioning from the prototype to the execution phase. Meanwhile plans are developing for Phase 2, a major Upgrade programme targeting the third long shutdown, LS3. News on Phase 1 is included under the respective projects; we only provide a brief summary here. Phase 1 The plan for the L1 Trigger relies on the installation during the present shutdown of optical splitting for the Trigger input signals. This will allow the new Trigger system to be brought online and fully commissioned during beam operation in 2015, while CMS relies on the existing legacy Trigger for physics. Once fully commissioned the experiment can switch over to the new Trigger, which will provide greatly improved performance at high event pile-up, by 2016. System tests of the splitter system, and of the new architecture of the calorimeter trigger were very successful, and the work in LS1 is on-track. Prototype ...

  20. Physics potential and experimental challenges of the LHC luminosity upgrade

    CERN Document Server

    Gianotti, F.; Virdee, T.; Abdullin, S.; Azuelos, G.; Ball, A.; Barberis, D.; Belyaev, A.; Bloch, P.; Bosman, M.; Casagrande, L.; Cavalli, D.; Chumney, Pamela R.K.; Cittolin, S.; Dasu, S.; De Roeck, A.; Ellis, N.; Farthouat, P.; Fournier, D.; Hansen, J.B.; Hinchliffe, I.; Hohlfeld, M.; Huhtinen, M.; Jakobs, K.; Joram, C.; Mazzucato, F.; Mikenberg, G.; Miagkov, A.; Moretti, M.; Moretti, S.; Niinikoski, T.; Nikitenko, A.; Nisati, A.; Paige, F.; Palestini, S.; Papadopoulos, C.G.; Piccinini, F.; Pittau, R.; Polesello, G.; Richter-Was, E.; Sharp, P.; Slabospitsky, S.R.; Smith, W.H.; Stapnes, S.; Tonelli, G.; Tsesmelis, E.; Usubov, Z.; Vacavant, L.; van der Bij, J.; Watson, A.; Wielers, M.

    2005-01-01

    We discuss the physics potential and the experimental challenges of an upgraded LHC running at an instantaneous luminosity of 10**35 cm-2s-1. The detector R&D needed to operate ATLAS and CMS in a very high radiation environment and the expected detector performance are discussed. A few examples of the increased physics potential are given, ranging from precise measurements within the Standard Model (in particular in the Higgs sector) to the discovery reach for several New Physics processes

  1. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  2. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  3. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  4. VVER 1000-NPP Temelin safety upgrading

    International Nuclear Information System (INIS)

    Fleischhans, J.; Ubra, O.

    1995-01-01

    A modernisation program upgrading Temelin plant to meet internationally adopted standard has been implemented during plant design and construction phases. The initial Czech-Russian design (primary system was of Russian design, secondary system was of Czech design) has been extensively modified and adapted to present western safety criteria and operational requirements. The goals are to achieve a high level of safety, reliability, availability and load-following ability. The load-following ability and response to grid frequency changes are very important for the Czech Republic, since the nuclear capacity represents a high proportion of the overall electrical system there. On the basis of IAEA OSART missions and Halliburton NUS audit results and in compliance with recommendations of The State Office for Nuclear Safety, Czech Power Company and Czech scientists and researchers a modernisation program project for Temelin has been carried out. It includes three main groups of VVER1000 MW unit innovations: - Modernization and upgrading of the safety and control systems. - Fuel replacement and modification of the reactor core. - Innovation of some components of the primary and secondary systems. The tenders for instrumentation and control system, nuclear fuel, diagnostic system and radiation monitoring system were issued to the world-well known suppliers. The US company Westinghouse Electric >Corporation (WEC) was selected to submit contract for the delivery of instrumentation and control system primary side diagnostic system and for the delivery of nuclear fuel. The contract was signed in 1993

  5. The upgrade for the data acquisition system of the KOTO detector

    Energy Technology Data Exchange (ETDEWEB)

    Tecchio, M., E-mail: tecchio@umich.edu [University of Michigan, Ann Arbor, MI (United States); Beechert, J.; Campbell, M. [University of Michigan, Ann Arbor, MI (United States); Huff, M. [Kenyon College, Gambier, OH (United States); Micallef, J.; Rymph, C.; Schamis, H.; Su, S. [University of Michigan, Ann Arbor, MI (United States); Xu, J. [Apple Inc., Cupertino, CA (United States)

    2016-07-11

    A major upgrade to the KOTO detector data acquisition system based on the ATCA standard is being considered. The ATCA standard provides a natural solution to the current KOTO constraints, including communication between boards and higher input and output bandwidth.

  6. The upgrade for the data acquisition system of the KOTO detector

    International Nuclear Information System (INIS)

    Tecchio, M.; Beechert, J.; Campbell, M.; Huff, M.; Micallef, J.; Rymph, C.; Schamis, H.; Su, S.; Xu, J.

    2016-01-01

    A major upgrade to the KOTO detector data acquisition system based on the ATCA standard is being considered. The ATCA standard provides a natural solution to the current KOTO constraints, including communication between boards and higher input and output bandwidth.

  7. Chapter 7: High-Density H-Mode Operation in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Stober, Joerg Karl; Lang, Peter Thomas; Mertens, Vitus

    2003-01-01

    Recent results are reported on the maximum achievable H-mode density and the behavior of pedestal density and central density peaking as this limit is approached. The maximum achievable H-mode density roughly scales as the Greenwald density, though a dependence on B t is clearly observed. In contrast to the stiff temperature profiles, the density profiles seem to allow more shape variation and especially with high-field-side pellet-injection, strongly peaked profiles with good confinement have been achieved. Also, spontaneous density peaking at high densities is observed in ASDEX Upgrade, which is related to the generally observed large time constants for the density profile equilibration. The equilibrated density profile shapes depend strongly on the heat-flux profile in the sense that central heating leads to significantly flatter profiles

  8. Extension of electron cyclotron heating at ASDEX Upgrade with respect to high density operation

    Directory of Open Access Journals (Sweden)

    Schubert Martin

    2017-01-01

    Full Text Available The ASDEX Upgrade electron cyclotron resonance heating operates at 105 GHz and 140 GHz with flexible launching geometry and polarization. In 2016 four Gyrotrons with 10 sec pulse length and output power close to 1 MW per unit were available. The system is presently being extended to eight similar units in total. High heating power and high plasma density operation will be a part of the future ASDEX Upgrade experiment program. For the electron cyclotron resonance heating, an O-2 mode scheme is proposed, which is compatible with the expected high plasma densities. It may, however, suffer from incomplete single-pass absorption. The situation can be improved significantly by installing holographic mirrors on the inner column, which allow for a second pass of the unabsorbed fraction of the millimetre wave beam. Since the beam path in the plasma is subject to refraction, the beam position on the holographic mirror has to be controlled. Thermocouples built into the mirror surface are used for this purpose. As a protective measure, the tiles of the heat shield on the inner column were modified in order to increase the shielding against unabsorbed millimetre wave power.

  9. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  10. Future of the CMS Muon System Upgrades and Aging

    CERN Document Server

    Pilot, Justin Robert

    2016-01-01

    The CMS detector currently includes three different muon detector types drift tubes (DT) in the central region, cathode strip chambers (CSC) in the forward regions, and resistive plate chambers (RPC) in both the forward and central regions. Several upgrade projects are planned to maintain high data-taking efficiency with the planned running conditions for the high-luminosity upgrade of the LHC. These upgrades are designed to ensure detector longevity and increase redundancy, while mitigating rate increases and retaining sensitivity to phyics processes. This involves changes to electronics and infrastructure of existing detectors, and adding new detectors in the forward region of the CMS experiment. Plans for each of the muon subsystems are described here in the context of the Phase-II upgrade schedule of the CMS experiment.

  11. Feasibility study for Tehran Research Reactor power upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Farhadi, Kazem [Nuclear Research Center, Atomic Energy Organization of Iran (AEOI), Tehran (Iran, Islamic Republic of)], E-mail: kfarhadi@aeoi.org.ir; Khakshournia, Samad [Nuclear Research Center, Atomic Energy Organization of Iran (AEOI), Tehran (Iran, Islamic Republic of)

    2008-07-15

    The present work is concerned with a power upgrading study of Tehran Research Reactor (TRR). The upgrading study is aimed at investigating the possibility of raising power of the TRR from the current level of 5 MW{sub th} to a higher level without violating the original thermal-hydraulic safety criteria. The existing core, comprising 22 standard fuel elements and five control fuel elements, is used for the analyses. Different reactor thermal powers (5-11 MW) and different core coolant flow rates (500-921 m{sup 3}/h) are considered. It is shown that, for the present core, this goal could be achieved safely by gradually opening the butterfly control valve until the desired coolant flow rate is reached. The TRR power could be upgraded up to around 7.5 MW{sub th} with the total power peaking factor maintained at less than or equal to 3.0.

  12. Feasibility study for Tehran Research Reactor power upgrading

    International Nuclear Information System (INIS)

    Farhadi, Kazem; Khakshournia, Samad

    2008-01-01

    The present work is concerned with a power upgrading study of Tehran Research Reactor (TRR). The upgrading study is aimed at investigating the possibility of raising power of the TRR from the current level of 5 MW th to a higher level without violating the original thermal-hydraulic safety criteria. The existing core, comprising 22 standard fuel elements and five control fuel elements, is used for the analyses. Different reactor thermal powers (5-11 MW) and different core coolant flow rates (500-921 m 3 /h) are considered. It is shown that, for the present core, this goal could be achieved safely by gradually opening the butterfly control valve until the desired coolant flow rate is reached. The TRR power could be upgraded up to around 7.5 MW th with the total power peaking factor maintained at less than or equal to 3.0

  13. Tevatron: recent results and prospects at the upgrade

    International Nuclear Information System (INIS)

    Mondal, Naba K.

    1998-01-01

    In this article, we review some of the recent results from CDF and DΦ experiments at the Tevatron and their prospects at the upgrade. Among the topics discussed are top quark physics, electroweak physics, QCD physics and new physics beyond standard model. (author)

  14. Plans and status of the LHCb upgrade

    CERN Document Server

    Szumlak, Tomasz

    2017-01-01

    LHCb (Large Hadron Collider beauty) is a high precision experiment dedicated to searching for New Physics beyond the Standard Model in the heavy flavour sector. Since LHCb is optimised to perf orm indirect studies and is sensitive to mass scales potentially larger than the LHC energy it is playing a key role in broad searches for New Physics phenomena. This expectation is supported by many intriguing anomalies, especially related to rare decays and lepton flavour universality, observed and reported by LHCb. Thus, it is essential for LHCb to enter the high luminosity phase and continue data taking beyond LHC Long Shutdown 2 (LS2). The LHCb experimental setup will undergo a major upgrade that is be ing planned for the LHC Run 3. Here we will discuss selected aspects of this project.

  15. Physics potential and experimental challenges of the LHC luminosity upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Gianotti, F.; Ball, A.; Bloch, P.; Casagrande, L.; Cittolin, S.; Roeck, A. de; Ellis, N.; Farthouat, P.; Hansen, J.-B. [CERN, Experimental Physics Division, Geneva (Switzerland); Mangano, M.L. [CERN, Theoretical Physics Division, Geneva (Switzerland); Virdee, T. [CERN, Experimental Physics Division, Geneva (Switzerland); Imperial College, London (United Kingdom); Abdullin, S. [University of Maryland (United States); Azuelos, G. [University of Montreal, Group of Particle Physics, Montreal (Canada); Barberis, D. [Universita di Genova, Dipartimento di Fisica and INFN (Italy); Belyaev, A. [Florida State University, Tallahassee, FL (United States); Bosman, M. [IFAE, Barcelona (Spain); Cavalli, D. [INFN, Milano (Italy); Chumney, P.; Dasu, S. [Univ. of Wisconsin, Madison, WI (United States); Fournier, D. [LAL, Orsay (France); Hinchliffe, I.; Hohlfeld, M.; Huhtinen, M.; Jakobs, K.; Joram, C.; Mazzucato, F.; Mikenberg, G.; Miagkov, A.; Moretti, M.; Moretti, S.; Niinikoski, T.; Nikitenko, A.; Nisati, A.; Paige, F.; Palestini, S.; Papadopoulos, C.G.; Piccinini, F.; Pittau, R.; Polesello, G.; Richter-Was, E.; Sharp, P.; Slabospitsky, S.R.; Smith, W.H.; Stapnes, S.; Tonelli, G.; Tsesmelis, E.; Usubov, Z.; Vacavant, L.; Bij, J. van der; Watson, A.; Wielers, M.

    2004-02-01

    We discuss the physics potential and the experimental challenges of an upgraded LHC running at an instantaneous luminosity of 10{sup 35} cm{sup -2}s{sup -1}. The detector R and D needed to operate ATLAS and CMS in a very high radiation environment and the expected detector performance are discussed. A few examples of the increased physics potential are given, ranging from precise measurements within the Standard Model (in particular in the Higgs sector) to the discovery reach for several New Physics processes. (orig.)

  16. Safety upgrade at the Leningrad NPP

    International Nuclear Information System (INIS)

    Eperin, A.P.

    1996-01-01

    The LNPP was developed according to the standards of early 70's but, at the same time, during the whole period of operation, the Plant equipment, technological, automatic and control and protection systems were upgraded with regard to changing safety and reliability requirements. Main steps taken during the backfitting stage to improve the reliability and safety of LNPP equipment and systems are discussed

  17. Performance of Edgeless Silicon Pixel Sensors on p-type substrate for the ATLAS High-Luminosity Upgrade

    CERN Document Server

    INSPIRE-00052711; Boscardin, Maurizio; Bosisio, Luciano; Calderini, Giovanni; Chauveau, Jacques; Ducourthial, Audrey; Giacomini, Gabriele; Marchiori, Giovanni; Zorzi, Nicola

    2016-01-01

    In view of the LHC upgrade phases towards the High Luminosity LHC (HL-LHC), the ATLAS experiment plans to upgrade the Inner Detector with an all-silicon system. The n-on-p silicon technology is a promising candidate to achieve a large area instrumented with pixel sensors, since it is radiation hard and cost effective. The paper reports on the performance of novel n-on-p edgeless planar pixel sensors produced by FBK-CMM, making use of the active trench for the reduction of the dead area at the periphery of the device. After discussing the sensor technology an overview of the first beam test results will be given.

  18. Development of Edgeless Silicon Pixel Sensors on p-type substrate for the ATLAS High-Luminosity Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Calderini, G. [Laboratoire de Physique Nucléaire et des Hautes Energies (LPNHE), Paris (France); Dipartimento di Fisica E. Fermi, Universitá di Pisa, Pisa (Italy); Bagolini, A. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM), Povo di Trento (Italy); Beccherle, R. [Istituto Nazionale di Fisica Nucleare, Sez. di Pisa (Italy); Bomben, M. [Laboratoire de Physique Nucléaire et des Hautes Energies (LPNHE), Paris (France); Boscardin, M. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM), Povo di Trento (Italy); Bosisio, L. [Università degli studi di Trieste (Italy); INFN-Trieste (Italy); Chauveau, J. [Laboratoire de Physique Nucléaire et des Hautes Energies (LPNHE), Paris (France); Giacomini, G. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM), Povo di Trento (Italy); La Rosa, A. [Section de Physique (DPNC), Universitè de Geneve, Geneve (Switzerland); Marchiori, G. [Laboratoire de Physique Nucléaire et des Hautes Energies (LPNHE), Paris (France); Zorzi, N. [Fondazione Bruno Kessler, Centro per i Materiali e i Microsistemi (FBK-CMM), Povo di Trento (Italy)

    2016-09-21

    In view of the LHC upgrade phases towards the High Luminosity LHC (HL-LHC), the ATLAS experiment plans to upgrade the Inner Detector with an all-silicon system. The n-on-p silicon technology is a promising candidate to achieve a large area instrumented with pixel sensors, since it is radiation hard and cost effective. The presentation describes the performance of novel n-in-p edgeless planar pixel sensors produced by FBK-CMM, making use of the active trench for the reduction of the dead area at the periphery of the device. After discussing the sensor technology, some feedback from preliminary results of the first beam test will be discussed.

  19. LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hennessy, Karol

    2017-02-11

    The upgrade of the LHCb experiment, scheduled for LHC Run-III, scheduled to start in 2021, will transform the experiment to a trigger-less system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm enabling the detector to run at luminosities of 2×10{sup 33} cm{sup −2} s{sup −1}. The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will provide fast pattern recognition and track reconstruction to the software trigger. The silicon pixel sensors have 55×55 μm{sup 2} pitch, and are read out by the VeloPix ASIC, from the Timepix/Medipix family. The hottest region will have pixel hit rates of 900 Mhits/s yielding a total data rate of more than 3 Tbit/s for the upgraded VELO. The detector modules are located in a separate vacuum, separated from the beam vacuum by a thin custom made foil. The foil will be manufactured through milling and possibly thinned further by chemical etching. The material budget will be minimised by the use of evaporative CO{sub 2} coolant circulating in microchannels within 400 μm thick silicon substrates. The current status of the VELO upgrade is described and latest results from operation of irradiated sensor assemblies are presented.

  20. The design of a fast Level-1 track trigger for the high luminosity upgrade of ATLAS.

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00413032; The ATLAS collaboration

    2016-01-01

    The high/luminosity upgrade of the LHC will increase the rate of the proton-proton collisions by approximately a factor of 5 with respect to the initial LHC-design. The ATLAS experiment will upgrade consequently, increasing its robustness and selectivity in the expected high radiation environment. In particular, the earliest, hardware based, ATLAS trigger stage ("Level 1") will require higher rejection power, still maintaining efficient selection on many various physics signatures. The key ingredient is the possibility of extracting tracking information from the brand new full-silicon detector and use it for the process. While fascinating, this solution poses a big challenge in the choice of the architecture, due to the reduced latency available at this trigger level (few tens of micro-seconds) and the high expected working rates (order of MHz). In this paper, we review the design possibilities of such a system in a potential new trigger and readout architecture, and present the performance resulting from a d...

  1. Environmental Life Cycle Assessment and Cost Analysis of Bath, NY Wastewater Treatment Plant: Potential Upgrade Implications

    Science.gov (United States)

    Many communities across the U.S. are required to upgrade wastewater treatment plants (WWTP) to meet increasingly stringent nutrient effluent standards. However, increased capital, energy and chemical requirements of upgrades create potential trade-offs between eutrophication pot...

  2. submitter Search for Dark Matter in the Upgraded High Luminosity LHC at CERN: Sensitivity of ATLAS phase II upgrade to dark matter production

    CERN Document Server

    Hallsjö, Sven-Patrik; Johansson, Magnus

    The LHC at CERN is now undergoing a set of upgrades to increase the center of mass energy for the colliding particles to be able to explore new physical processes. The focus of this thesis lies on the so called phase II upgrade which will preliminarily be completed in 2023. After the upgrade the LHC will be able to accelerate proton beams to such a velocity thateach proton has a center of mass energy of 14 TeV. One disadvantage of the upgrade is that it will be harder for the atlas detector to isolate unique particle collisions since more and more collisions will occur simultaneously, so called pile-up. For 14 TeV there does not exist a full simulation of the atlas detector. This thesis instead uses data from Monte Carlo simulations for the particle collisions and then uses so called smearing functions to emulate the detector responses. This thesis focuses on how a mono-jet analysis looking for different wimp models of dark matter will be affected by this increase in pile-up rate. The signal models which are ...

  3. Progress and plan of KSTAR plasma control system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hahn, Sang-hee, E-mail: hahn76@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, Y.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Penaflor, B.G. [General Atomics, San Diego, CA (United States); Bak, J.G.; Han, H.; Hong, J.S.; Jeon, Y.M.; Jeong, J.H.; Joung, M.; Juhn, J.W.; Kim, J.S.; Kim, H.S.; Lee, W.R.; Woo, M.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Eidietis, N.W.; Ferron, J.R.; Humphreys, D.A.; Hyatt, A.; Johnson, R.D.; Piglowski, D.A. [General Atomics, San Diego, CA (United States); and others

    2016-11-15

    Highlights: • Recent achievements of the KSTAR plasma control system are described. • Requirements and results of the testbed system for the future upgrade of the KSTAR plasma control system are presented. • An overview of the upgrade layout based is given. - Abstract: The plasma control system (PCS) has been one of essential systems in annual KSTAR plasma campaigns: starting from a single-process version in 2008, extensive upgrades are done through the previous 7 years in order to achieve major goals of KSTAR performance enhancement. Major implementations are explained in this paper. In consequences of successive upgrades, the present KSTAR PCS is able to achieve ∼48 s of 500 kA plasma pulses with full real-time shaping controls and real-time NB power controls. It has become a huge system capable of dealing with 8 separate categories of algorithms, 26 actuators directly controllable during the shot, and real-time data communication units consisting of +180 analog channels and +600 digital input/outputs through the reflective memory (RFM) network. The next upgrade of the KSTAR PCS is planned in 2015 before the campaign. An overview of the upgrade layout will be given for this paper. The real-time system box is planned to use the CERN MRG-Realtime OS, an ITER-compatible standard operating system. New hardware is developed for faster real-time streaming system for future installations of actuators/diagnostics.

  4. The status of the LAMPF control system upgrade

    International Nuclear Information System (INIS)

    Carr, G.P.; Schaller, S.C.; Bjorklund, E.A.; Burns, M.J.; Harrison, J.F.; Rose, P.A.; Schultz, D.E.

    1987-01-01

    The upgraded Los Alamos Meson Physics Facility (LAMPF) control system is now operational. The SEL-840 computer has been removed, and all application programs are now running on VAXes. We are continuing to upgrade the control system network. We are using MicroVMS systems for distributed local control and have introduced VAXELN systems for dedicated real-time situations. Communications with both systems is based on a standardized remote procedure call interface. We have also begun to integrate the Proton Storage Ring controls with the LAMPF control system, to experiment with VAX/GPX-based workstation operator interfaces, and to investigate possible applications of artificial intelligence technology. 13 refs

  5. Upgrading a 1950s tank farm to meet the environmental standards of the 1990S

    International Nuclear Information System (INIS)

    Butler, C.F.; Peterson, S.W.

    1995-01-01

    The Texaco Inc. Research and Development (Texaco) facility in Beacon, New York includes an above ground storage tank (AST) farm, known as Tank Farm No. 1, which consists of eighteen tanks with capacities ranging from 10,000 to 21,000 gallons. A second tank farm, at the Texaco, Beacon facility, designated as the Boiler House Tank Farm, includes three additional tanks with capacities from 10,000 to 44,900 gallons. The Tank Farm No. 1 AST systems are all vertical, carbon steel tanks which were initially installed in several phases in the 1950s. The Boiler House Tank Farm ASTs are also vertical, carbon steel tanks, including one riveted construction tank that was installed in 1931. Each of the Texaco ASTs are used to store a variety of petroleum products, including diesel fuel, stoddard solvent, used oil, and various grades of gasoline and gasoline components. The New York State Department of Environmental Conservation (NYSDEC) has established regulations for petroleum bulk storage in 6 NYCRR Parts 612 through 614. These regulations include requirements for monitoring and inspecting AST systems, including a rigorous ''out of service'' inspection, to be completed at least once every ten years. Although several revisions had been completed at Tank Farm No. 1 in recent years, including installation of a reinforced concrete secondary containment dike system and new above ground piping, the tank shells and most appurtenances (e.g. water drawoff valves), were unmodified since they were initially installed. On this basis, Texaco decided to upgrade the AST systems in conjunction with the NYSDEC ten-year inspections, by installing reinforced fiberglass liners in the tank floors, and by removing and/or replacing tank appurtenances to meet current industry standards and fire code requirements. This paper presents a summary of the program implemented to upgrade the Texaco, Beacon tank farm AST systems

  6. Imaging motional Stark effect measurements at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Ford, O. P.; Burckhart, A.; McDermott, R.; Pütterich, T.; Wolf, R. C. [Max-Planck Institut für Plasmaphysik, Greifswald/Garching (Germany)

    2016-11-15

    This paper presents an overview of results from the Imaging Motional Stark Effect (IMSE) diagnostic obtained during its first measurement campaign at ASDEX Upgrade since installation as a permanent diagnostic. A brief overview of the IMSE technique is given, followed by measurements of a standard H-mode discharge, which are compared to equilibrium reconstructions showing good agreement where expected. The development of special discharges for the calibration of pitch angle is reported and safety factor profile changes during sawteeth crashes are shown, which can be resolved to a few percent due to the high sensitivity at good time resolution of the new IMSE system.

  7. Biogas upgrading - Review of commercial technologies; Biogasuppgradering - Granskning av kommersiella tekniker

    Energy Technology Data Exchange (ETDEWEB)

    Bauer, Fredric; Hulteberg, Christian; Persson, Tobias; Tamm, Daniel

    2013-04-01

    Biogas production is growing and there is an increasing demand for upgraded biogas, to be used as vehicle fuel or injected to the natural gas grid. To enable the efficient use of biogas in these applications the gas must be upgraded, i.e. the carbon dioxide, which constitutes a large part of the raw biogas from the digester, must be separated from the methane. This report aims to evaluate the biogas upgrading technologies that are commercially available and in operation today: amine scrubbers, water scrubbers, PSA units, organic scrubbers and membrane units. The technologies are described in detail by presenting the theory behind the separation mechanism, the upgrading process as a complete system, operational issues and how these are solved, and finally the most important financial data. Furthermore, the best developed cryogenic technologies, which today are being used to purify landfill gas and biogas from some specific components and to liquefy biogas, are presented. Cryogenic upgrading is an interesting possibility, but as this report shows, the technology still has some important operational issues to resolve. Technologies which are especially focused on small-scale applications are finally presented, however not in as much detail as the other, more common technologies. The report shows that for mid-scale applications, the most common options are all viable. The scrubbing technologies all perform well and have similar costs of investment and operation. The simplicity and reliability of the water scrubber has made this the preferred choice in many applications, but the high purity and very low methane slip from amine scrubbers are important characteristics. Regarding PSA and membrane units, the investment cost for these are about the same as for scrubbers. Furthermore, recent developments of the membrane units have also made it possible to reach low methane slips with this technology. Biogas production is increasing, in Sweden and globally, and the interest for

  8. Upgrade of the ALICE Experiment: Letter of Intent

    CERN Document Server

    Abelev, B; Adamová, D; Aggarwal, M M; Aglieri Rinella, G; Agnello, M; Agostinelli, A; Agrawal, N; Ahammed, Z; Ahmad, N; Ahmad Masoodi, A; Ahmed, I; Ahn, S U; Ahn, S A; Aimo, I; Aiola, S; Ajaz, M; Akindinov, A; Aleksandrov, D; Alessandro, B; Alexandre, D; Alici, A; Alkin, A; Alme, J; Alt, T; Altini, V; Altinpinar, S; Altsybeev, I; Alves Garcia Prado, C; Anderssen, E C; Andrei, C; Andronic, A; Anguelov, V; Anielski, J; Anticic, T; Antinori, F; Antonioli, P; Aphecetche, L; Appelshäuser, H; Arbor, N; Arcelli, S; Armesto, N; Arnaldi, R; Aronsson, T; Arsene, I C; Arslandok, M; Augustinus, A; Averbeck, R; Awes, T C; Azmi, M D; Bach, M; Badalà, A; Baek, Y W; Bagnasco, S; Bailhache, R; Bairathi, V; Bala, R; Baldisseri, A; Baltasar Dos Santos Pedrosa, F; Bán, J; Baral, R C; Barbera, R; Barile, F; Barnaföldi, G G; Barnby, L S; Barret, V; Bartke, J; Basile, M; Bastian Van Beelen, J; Bastid, N; Basu, S; Bathen, B; Batigne, G; Battistin, M; Batyunya, B; Batzing, P C; Baudot, J; Baumann, C; Bearden, I G; Beck, H; Bedda, C; Behera, N K; Belikov, I; Bellini, F; Bellwied, R; Belmont-Moreno, E; Bencedi, G; Benettoni, M; Benotto, F; Beole, S; Berceanu, I; Bercuci, A; Berdnikov, Y; Berenyi, D; Berger, M E; Bertens, R A; Berzano, D; Besson, A; Betev, L; Bhasin, A; Bhati, A K; Bhatti, A; Bhattacharjee, B; Bhom, J; Bianchi, L; Bianchi, N; Bianchin, C; Bielcík, J; Bielcíková, J; Bilandzic, A; Bjelogrlic, S; Blanco, F; Blau, D; Blume, C; Bock, F; Boehmer, F V; Bogdanov, A; Boggild, H; Bogolyubsky, M; Boldizsár, L; Bombara, M; Book, J; Borel, H; Borissov, A; Bornschein, J; Borshchov, V N; Bortolin, C; Bossú, F; Botje, M; Botta, E; Böttger, S; Braun-Munzinger, P; Breitner, T; Broker, T A; Browning, T A; Broz, M; Bruna, E; Bruno, G E; Budnikov, D; Buesching, H; Bufalino, S; Buncic, P; Busch, O; Buthelezi, Z; Caffarri, D; Cai, X; Caines, H; Caliva, A; Calvo Villar, E; Camerini, P; Canoa Roman, V; Carena, F; Carena, W; Cariola, P; Carminati, F; Casanova Díaz, A; Castillo Castellanos, J; Casula, E A R; Catanescu, V; Caudron, T; Cavicchioli, C; Ceballos Sanchez, C; Cepila, J; Cerello, P; Chang, B; Chapeland, S; Charvet, J L; Chattopadhyay, S; Chattopadhyay, S; Cherney, M; Cheshkov, C; Cheynis, B; Chibante Barroso, V; Chinellato, D D; Chochula, P; Chojnacki, M; Choudhury, S; Christakoglou, P; Christensen, C H; Christiansen, P; Chujo, T; Chung, S U; Cicalo, C; Cifarelli, L; Cindolo, F; Claus, G; Cleymans, J; Colamaria, F; Colella, D; Coli, S; Colledani, C; Collu, A; Colocci, M; Conesa Balbastre, G; Conesa del Valle, Z; Connors, M E; Contin, G; Contreras, J G; Cormier, T M; Corrales Morales, Y; Cortese, P; Cortés Maldonado, I; Cosentino, M R; Costa, F; Crochet, P; Cruz Albino, R; Cuautle, E; Cunqueiro, L; Dainese, A; Dang, R; Danu, A; Da Riva, E; Das, D; Das, I; Das, K; Das, S; Dash, A; Dash, S; De, S; Decosse, C; Delagrange, H; Deloff, A; Dénes, E; D'Erasmo, G; de Barros, G O V; De Caro, A; de Cataldo, G; de Cuveland, J; De Falco, A; De Gruttola, D; De Marco, N; De Pasquale, S; De Robertis, G; De Roo, K; de Rooij, R; Diaz Corchero, M A; Dietel, T; Divià, R; Di Bari, D; Di Liberto, S; Di Mauro, A; Di Nezza, P; Djuvsland, o; Dobrin, A; Dobrowolski, T; Domenicis Gimenez, D; Dönigus, B; Dordic, O; Dorheim, S; Dorokhov, A; Doziere, G; Dubey, A K; Dubla, A; Ducroux, L; Dulinski, W; Dupieux, P; Dutta Majumdar, A K; Ehlers III, R J; Elia, D; Engel, H; Erazmus, B; Erdal, H A; Eschweiler, D; Espagnon, B; Estienne, M; Esumi, S; Evans, D; Evdokimov, S; Eyyubova, G; Fabris, D; Faivre, J; Falchieri, D; Fantoni, A; Fasel, M; Fehlker, D; Feldkamp, L; Felea, D; Feliciello, A; Feofilov, G; Ferencei, J; Fernández Téllez, A; Ferreiro, E G; Ferretti, A; Festanti, A; Figiel, J; Figueredo, M A S; Filchagin, S; Finogeev, D; Fionda, F M; Fiore, E M; Fiorenza, G; Floratos, E; Floris, M; Foertsch, S; Foka, P; Fokin, S; Fragiacomo, E; Francescon, A; Franco, M; Frankenfeld, U; Fuchs, U; Furget, C; Fusco Girard, M; Gaardhoje, J J; Gagliardi, M; Gajanana, D; Gallio, M; Gangadharan, D R; Ganoti, P; Garabatos, C; Garcia-Solis, E; Gargiulo, C; Garishvili, I; Gerhard, J; Germain, M; Gheata, A; Gheata, M; Ghidini, B; Ghosh, P; Ghosh, S K; Gianotti, P; Giubilato, P; Giubellino, P; Gladysz-Dziadus, E; Glässel, P; Gomez, R; Gomez Marzoa, M; González-Zamora, P; Gorbunov, S; Görlich, L; Gotovac, S; Graczykowski, L K; Grajcarek, R; Greiner, L C; Grelli, A; Grigoras, A; Grigoras, C; Grigoriev, V; Grigoryan, A; Grigoryan, S; Grinyov, B; Grion, N; Grondin, D; Grosse-Oetringhaus, J F; Grossiord, J -Y; Grosso, R; Guber, F; Guernane, R; Guerzoni, B; Guilbaud, M; Gulbrandsen, K; Gulkanyan, H; Gunji, T; Gupta, A; Gupta, R; H Khan, K; Haake, R; Haaland, o; Hadjidakis, C; Haiduc, M; Hamagaki, H; Hamar, G; Hanratty, L D; Hansen, A; Harris, J W; Hartmann, H; Harton, A; Hatzifotiadou, D; Hayashi, S; Heckel, S T; Heide, M; Helstrup, H; Hennes, E; Herghelegiu, A; Herrera Corral, G; Hess, B A; Hetland, K F; Hicks, B; Hillemanns, H; Himmi, A; Hippolyte, B; Hladky, J; Hristov, P; Huang, M; Hu-Guo, C; Humanic, T J; Hutter, D; Hwang, D S; Igolkin, S; Ijzermans, P; Ilkaev, R; Ilkiv, I; Inaba, M; Incani, E; Innocenti, G M; Ionita, C; Ippolitov, M; Irfan, M; Ivanov, M; Ivanov, V; Ivanytskyi, O; Jacholkowski, A; Jadlovsky, J; Jahnke, C; Jang, H J; Janik, M A; Jayarathna, P H S Y; Jena, S; Jimenez Bustamante, R T; Jones, P G; Jung, H; Junique, A; Jusko, A; Kalcher, S; Kalinak, P; Kalweit, A; Kamin, J; Kang, J H; Kaplin, V; Kar, S; Karasu Uysal, A; Karavichev, O; Karavicheva, T; Karpechev, E; Kebschull, U; Keidel, R; Keil, M; Ketzer, B; Khan, M Mohisin; Khan, P; Khan, S A; Khanzadeev, A; Kharlov, Y; Kileng, B; Kim, B; Kim, D; Kim, D W; Kim, D J; Kim, J S; Kim, M; Kim, M; Kim, S; Kim, T; Kirsch, S; Kisel, I; Kiselev, S; Kisiel, A; Kiss, G; Klay, J L; Klein, J; Klein-Bösing, C; Kluge, A; Knichel, M L; Knospe, A G; Kobdaj, C; Kofarago, M; Köhler, M K; Kollegger, T; Kolojvari, A; Kondratiev, V; Kondratyeva, N; Konevskikh, A; Kovalenko, V; Kowalski, M; Kox, S; Koyithatta Meethaleveedu, G; Kral, J; Králik, I; Kramer, F; Kravcáková, A; Krelina, M; Kretz, M; Krivda, M; Krizek, F; Krus, M; Krymov, E B; Kryshen, E; Krzewicki, M; Kucera, V; Kucheriaev, Y; Kugathasan, T; Kuhn, C; Kuijer, P G; Kulakov, I; Kumar, J; Kurashvili, P; Kurepin, A; Kurepin, A B; Kuryakin, A; Kushpil, S; Kushpil, V; Kweon, M J; Kwon, Y; Ladron de Guevara, P; Lagana Fernandes, C; Lakomov, I; Langoy, R; Lara, C; Lardeux, A; Lattuca, A; La Pointe, S L; La Rocca, P; Lea, R; Lee, G R; Legrand, I; Lehnert, J; Lemmon, R C; Lenhardt, M; Lenti, V; Leogrande, E; Leoncino, M; León Monzón, I; Lesenechal, Y; Lévai, P; Li, S; Lien, J; Lietava, R; Lindal, S; Lindenstruth, V; Lippmann, C; Lisa, M A; Listratenko, O M; Ljunggren, H M; Lodato, D F; Loddo, F; Loenne, P I; Loggins, V R; Loginov, V; Lohner, D; Loizides, C; Lopez, X; López Torres, E; Lu, X -G; Luettig, P; Lunardon, M; Luo, J; Luparello, G; Luzzi, C; M Gago, A; M Jacobs, P; Ma, R; Maevskaya, A; Mager, M; Mahapatra, D P; Maire, A; Malaev, M; Maldonado Cervantes, I; Malinina, L; Mal'Kevich, D; Maltsev, N A; Malzacher, P; Mamonov, A; Manceau, L; Manko, V; Manso, F; Manzari, V; Mapelli, A; Marchisone, M; Mares, J; Margagliotti, G V; Margotti, A; Marín, A; Marin Tobon, C A; Markert, C; Marquard, M; Marras, D; Martashvili, I; Martin, N A; Martinengo, P; Martínez, M I; Martínez García, G; Martin Blanco, J; Martynov, Y; Mas, A; Masciocchi, S; Masera, M; Maslov, M; Masoni, A; Massacrier, L; Mastroserio, A; Mattiazzo, S; Matyja, A; Mayer, C; Mazer, J; Mazumder, R; Mazza, G; Mazzoni, M A; Meddi, F; Menchaca-Rocha, A; Mercado Pérez, J; Meres, M; Miake, Y; Mikhaylov, K; Milano, L; Milosevic, J; Mischke, A; Mishra, A N; Miskowiec, D; Mitu, C M; Mlynarz, J; Mohanty, B; Molnar, L; Mongelli, M; Montaño Zetina, L; Montes, E; Morando, M; Moreira De Godoy, D A; Morel, F; Moretto, S; Morreale, A; Morsch, A; Muccifora, V; Mudnic, E; Muhammad Bhopal, F; Muhuri, S; Mukherjee, M; Müller, H; Munhoz, M G; Murray, S; Musa, L; Musinsky, J; Nandi, B K; Nania, R; Nappi, E; Nattrass, C; Nayak, T K; Nazarenko, S; Nedosekin, A; Nicassio, M; Niculescu, M; Nielsen, B S; Nikolaev, S; Nikulin, S; Nikulin, V; Nilsen, B S; Noferini, F; Nomokonov, P; Nooren, G; Nyanin, A; Nystrand, J; Oeschler, H; Oh, S; Oh, S K; Okatan, A; Olah, L; Oleniacz, J; Oliveira Da Silva, A C; Onderwaater, J; Oppedisano, C; Ortiz Velasquez, A; Oskarsson, A; Otwinowski, J; Oyama, K; Pachmayer, Y; Pachr, M; Pagano, P; Paic, G; Painke, F; Pajares, C; Pal, S K; Palmeri, A; Panati, S; Pant, D; Pantano, D; Papikyan, V; Pappalardo, G S; Park, W J; Passfeld, A; Pastore, C; Patalakha, D I; Paticchio, V; Paul, B; Pawlak, T; Peitzmann, T; Pereira Da Costa, H; Pereira De Oliveira Filho, E; Peresunko, D; Pérez Lara, C E; Peryt, W; Pesci, A; Pestov, Y; Petagna, P; Petrácek, V; Petran, M; Petris, M; Petrovici, M; Petta, C; Pham, H; Piano, S; Pikna, M; Pillot, P; Pinazza, O; Pinsky, L; Piyarathna, D B; Ploskon, M; Planinic, M; Pluta, J; Pochybova, S; Podesta-Lerma, P L M; Poghosyan, M G; Pohjoisaho, E H O; Polichtchouk, B; Poljak, N; Pop, A; Porteboeuf-Houssais, S; Porter, J; Pospisil, V; Potukuchi, B; Prasad, S K; Preghenella, R; Prino, F; Protsenko, M A; Pruneau, C A; Pshenichnov, I; Puddu, G; Puggioni, C; Punin, V; Putschke, J; Qvigstad, H; Rachevski, A; Raha, S; Rak, J; Rakotozafindrabe, A; Ramello, L; Raniwala, R; Raniwala, S; Räsänen, S S; Rascanu, B T; Rasson, J E; Rathee, D; Rauf, A W; Razazi, V; Read, K F; Real, J S; Redlich, K; Reed, R J; Rehman, A; Reichelt, P; Reicher, M; Reidt, F; Renfordt, R; Reolon, A R; Reshetin, A; Rettig, F; Revol, J -P; Reygers, K; Riabov, V; Ricci, R A; Richert, T; Richter, M; Riedler, P; Riegler, W; Riggi, F; Rivetti, A; Rocco, E; Rodríguez Cahuantzi, M; Rodriguez Manso, A; Roed, K; Rogochaya, E; Rohni, S; Rohr, D; Röhrich, D; Romita, R; Ronchetti, F; Ronflette, L; Rosnet, P; Rossegger, S; Rossewij, M J; Rossi, A; Roudier, S; Rousset, J; Roy, A; Roy, C; Roy, P; Rubio Montero, A J; Rui, R; Russo, R; Ryabinkin, E; Ryabov, Y; Rybicki, A; Sacchetti, M; Sadovsky, S; Safarík, K; Sahlmuller, B; Sahoo, R; Sahu, P K; Saini, J; Salgado, C A; Salzwedel, J; Sambyal, S; Samsonov, V; Sanchez Castro, X; Sánchez Rodríguez, F J; sándor, L; Sandoval, A; Sano, M; Santagati, G; Santoro, R; Sarkar, D; Scapparone, E; Scarlassara, F; Scharenberg, R P; Schiaua, C; Schicker, R; Schipper, J D; Schmidt, C; Schmidt, H R; Schuchmann, S; Schukraft, J; Schulc, M; Schuster, T; Schutz, Y; Schwarz, K; Schweda, K; Scioli, G; Scomparin, E; Scott, P A; Scott, R; Segato, G; Seger, J E; Selyuzhenkov, I; Senyukhov, S; Seo, J; Serradilla, E; Sevcenco, A; Sgura, I; Shabetai, A; Shabratova, G; Shahoyan, R; Shangaraev, A; Sharma, N; Sharma, S; Shigaki, K; Shtejer, K; Sibiriak, Y; Siddhanta, S; Siemiarczuk, T; Silvermyr, D; Silvestre, C; Simatovic, G; Singaraju, R; Singh, R; Singha, S; Singhal, V; Sinha, B C; Sinha, T; Sitar, B; Sitta, M; Skaali, T B; Skjerdal, K; Smakal, R; Smirnov, N; Snellings, R J M; Snoeys, W; Sogaard, C; Soltz, R; Song, J; Song, M; Sooden, V; Soramel, F; Sorensen, S; Spacek, M; spalek, J; Spiriti, E; Sputowska, I; Spyropoulou-Stassinaki, M; Srivastava, B K; Stachel, J; Stan, I; Stefanek, G; Steinpreis, M; Stenlund, E; Steyn, G; Stiller, J H; Stocco, D; Stolpovskiy, M; Strmen, P; Suaide, A A P; Subieta Vasquez, M A; Sugitate, T; Suire, C; Suleymanov, M; suljic, M; Sultanov, R; sumbera, M; Sun, X; Susa, T; Symons, T J M; Szanto de Toledo, A; Szarka, I; Szczepankiewicz, A; Szymanski, M; Takahashi, J; Tangaro, M A; Tapia Takaki, J D; Tarantola Peloni, A; Tarazona Martinez, A; Tauro, A; Tejeda Muñoz, G; Telesca, A; Terrevoli, C; Ter Minasyan, A; Thäder, J; Thomas, D; Tieulent, R; Timmins, A R; Toia, A; Torii, H; Trubnikov, V; Trzaska, W H; Tsuji, T; Tumkin, A; Turchetta, R; Turrisi, R; Tveter, T S; Tymchuk, I T; Ulery, J; Ullaland, K; Uras, A; Usai, G L; Vajzer, M; Vala, M; Valencia Palomo, L; Valentino, V; Valin, I; Vallero, S; Vande Vyvre, P; Vannucci, L; Van Der Maarel, J; Van Hoorne, J W; van Leeuwen, M; Vargas, A; Varma, R; Vasileiou, M; Vasiliev, A; Vasta, P; Vechernin, V; Veldhoen, M; Velure, A; Venaruzzo, M; Vercellin, E; Vergara Limón, S; Verlaat, B; Vernet, R; Verweij, M; Vickovic, L; Viesti, G; Viinikainen, J; Vilakazi, Z; Villalobos Baillie, O; Vinogradov, A; Vinogradov, L; Vinogradov, Y; Virgili, T; Viyogi, Y P; Vodopyanov, A; Völkl, M A; Voloshin, K; Voloshin, S A; Volpe, G; von Haller, B; Vorobyev, I; Vranic, D; Vrláková, J; Vulpescu, B; Vyushin, A; Wagner, B; Wagner, J; Wagner, V; Wang, M; Wang, Y; Watanabe, D; Weber, M; Wessels, J P; Westerhoff, U; Wiechula, J; Wikne, J; Wilde, M; Wilk, G; Wilkinson, J; Williams, M C S; Windelband, B; Winn, M; Winter, M; Xiang, C; Yaldo, C G; Yamaguchi, Y; Yang, H; Yang, P; Yang, S; Yano, S; Yasnopolskiy, S; Yi, J; Yin, Z; Yoo, I -K; Yushmanov, I; Zaccolo, V; Zach, C; Zaman, A; Zampolli, C; Zaporozhets, S; Zarochentsev, A; Závada, P; Zaviyalov, N; Zbroszczyk, H; Zgura, I S; Zhalov, M; Zhang, F; Zhang, H; Zhang, X; Zhang, Y; Zhao, C; Zherebchevsky, V I; Zhou, D; Zhou, F; Zhou, Y; Zhu, H; Zhu, J; Zhu, X; Zichichi, A; Zimmermann, A; Zinovjev, G; Zoccarato, Y; Zynovyev, M; Zyzak, M; CERN. Geneva. The LHC experiments Committee; LHCC

    2014-01-01

    The long term goal of the ALICE experiment is to provide a precise characterization of the high-density, high-temperature phase of strongly interacting matter. To achieve this goal, high-statistics precision measurement are required. The general upgrade strategy for the ALICE detector is conceived to deal with this challenge with expected Pb-Pb interaction rates of up to 50 kHz aiming at an integrated luminosity of the order of 10 nb^-1. With the proposed timeline, starting the high-rate operation progressively after 2018 shutdown, the goals set up in our upgrade plans should be achieved collecting data until mid-2020's. In this document we present the main physics motivations for running the LHC with heavy ions at high luminosities and discuss the modifications and replacements needed in the ALICE detectors, the online systems and offline system. The schedule, cost estimate and organization of the upgrade programme are presented as well.

  9. Upgrades to the ATLAS trigger system   

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00221618; The ATLAS collaboration

    2017-01-01

    In coming years the LHC is expected to undergo upgrades to increase both the energy of proton-proton collisions and the instantaneous luminosity. In order to cope with these more challenging LHC conditions, upgrades of the ATLAS trigger system will be required. This talk will focus on some of the key aspects of these upgrades. Firstly, the upgrade period between 2019-2021 will see an increase in instantaneous luminosity to $3\\times10^{34} \\rm{cm^{-2}s^{-1}}$. Upgrades to the Level 1 trigger system during this time will include improvements for both the muon and calorimeter triggers. These include the upgrade of the first-level Endcap Muon trigger, the calorimeter trigger electronics and the addition of new calorimeter feature extractor hardware, such as the Global Feature Extractor (gFEX). An overview will be given on the design and development status the aforementioned systems, along with the latest testing and validation results. By 2026, the High Luminosity LHC will be able to deliver 14 TeV collisions wit...

  10. Superconducting dipole magnet requirements for the Fermilab Phase 3 upgrade, SSC high energy booster, and Fermilab independent collider

    International Nuclear Information System (INIS)

    Nicol, T.H.; Kerby, J.S.

    1989-09-01

    In July 1988 a small working group was formed to develop a conceptual design for a high field superconducting dipole magnet suitable for use in the Phase III upgrade at Fermilab. The Phase III upgrade calls for replacement of the existing Tevatron with higher field magnets to boost the energy of the fixed target program to 1.5 TeV and to add a 1.8 TeV collider program. As the work of this group evolved it became clear that the resulting design might be applicable to more than just the proposed upgrade. In particular, it seemed plausible that the work might be applicable to the high energy booster (HEB) for the SSC. At the Breckenridge Workshop in August 1989 interest in a third project began to surface, namely the revamping of an earlier proposal for a dedicated collider at Fermilab. We refer to this proposal as the FNAL Independent Collider. The requirements for the dipole magnets for this independent collider appear to be remarkably similar to those proposed for the Phase III upgrade and the SSC HEB. The purpose of this report is to compare the conceptual design of the dipoles developed for the Phase III proposal with the requirements of those for the SSC HEB, the FNAL Independent Collider, and a hybrid design which could serve the needs of both. The Phase III design will be used as the reference point for parameter scaling. 4 figs., 3 tabs

  11. Upgrading the Medical Physics Calibration Laboratory Towards ISO/IEC 17025: Radiation Standards and Calibration in Diagnostic Radiology

    International Nuclear Information System (INIS)

    Asmaliza Hashim; Muhammad Jamal Md Isa; Abd Aziz Mhd Ramli; Wan Hazlinda Ismail; Norhayati Abdullah; Shahrul Azlan Azizan; Siti Sara Deraman; Nor Azlin Azraai; Md Khairusalih Md Zin

    2010-01-01

    Calibration of quality control (QC) test tools used in diagnostic radiology is legally required under the Ministry of Health (MOH) requirement. The Medical Physics Calibration Laboratory of the Malaysian Nuclear Agency is the national focal point for the calibration of quality control test tools used in diagnostic radiology. The Medical Physics Calibration Laboratory has measurement traceability to primary standard dosimetry laboratory (Physikalisch-Technische Bundesanstalt (PTB)), thus providing an interface between the primary standard dosimetry laboratory and Malaysian hospitals, clinics and license class H holder. The Medical Physics Calibration Laboratory facility is comprised of a constant potential x-ray system with a capability of 160 kV tube and a series of reference and working standard ion chambers. The stability of reference and working standard ion chambers was measured using strontium-90. Dosimetric instruments used in diagnostic radiology is calibrated in terms of air kerma to comply with an International Code of Practices of dosimetry for example IAEA's Technical Report Series number 457. The new series of standard radiation qualities was established based on ISO/IEC 61267. The measurement of beam homogeneity was measured using film and ion chamber to define the field size at certain distance and kV output was measured using the spectrometer and non-invasive kVp meter. The uncertainties measurement was determined with expended uncertainties to a level of confidence of approximately 95% (coverage factor k=2). This paper describes the available facility and the effort of the Medical Physics Calibration Laboratory to upgrade the laboratory towards ISO/IEC 17025. (author)

  12. The LHCb VELO Upgrade

    CERN Document Server

    de Capua, Stefano

    2016-01-01

    The upgrade of the LHCb experiment, scheduled for LHC Run-3, will transform the experiment to a triggerless system reading out the full detector at 40 MHz event rate. All data reduction algorithms will be executed in a high-level software farm, enabling the detector to run at luminosities of 2×1033 cm−2 s −1 . The Vertex Locator (VELO) is the silicon vertex detector surrounding the interaction region. The current strip detector will be replaced with a hybrid pixel system equipped with electronics capable of reading out at 40 MHz. The upgraded VELO will allow for fast pattern recognition and track reconstruction in the software trigger. The silicon pixel sensors have 55×55 µm2 pitch, and are read out by the VeloPix ASIC. The VeloPix builds on the currently available Timepix3, modified to deliver a radiation hard design capable of an order of magnitude increase in output rate. The hottest regions will have pixel hit rates of 900 Mhits/s, yielding a total data rate more than 3 Tbit/s for the upgraded VELO...

  13. LHCb; DAQ Architecture for the LHCb Upgrade

    CERN Multimedia

    Neufeld, N

    2013-01-01

    LHCb will have an upgrade of its detector in 2018. After the upgrade, the LHCb experiment will run at a high luminosity of 2x 10$^{33}$ cm$^{-2}$ . s$^{-1}$. The upgraded detector will be read out at 40 MHz with a highly flexible software-based triggering strategy. The Data Acquisition (DAQ) system of HCb reads out the data fragments from the Front-End Electronics and transports them to the High-Lever Trigger farm at an aggregate throughput of 32 Tbit/s. The DAQ system will be based on high speed network technologies such as InfiniBand and/or 10/40/100 Gigabit Ethernet. Independent of the network technology, there are different possible architectures for the DAQ system. In this paper, we present our studies on the DAQ architecture, where we analyze size, complexity and (relative) cost. We evaluate and compare several data-flow schemes for a network-based DAQ: push, pull and push with barrel-shifter traffic shaping. We also discuss the requirements and overall implications of the data-flow schemes on the DAQ ...

  14. The CMS Outer Tracker Upgrade for the High Luminosity LHC

    CERN Document Server

    Luetic, Jelena

    2017-01-01

    The era of the High Luminosity Large Hadron Collider will pose unprecedented challenges for detector design and operation. The planned luminosity of the upgraded machine is $5$x$10^{34} $ cm$^{-2}$s$^{-1}$, reaching an integrated luminosity of more than 3000 fb$^{-1}$ by the end of 2037. The CMS Tracker detector will have to be replaced in order to fully exploit the delivered luminosity and cope with the demanding operating conditions. The new detector will provide robust tracking as well as input for the first level trigger. This report is focusing on the replacement of the CMS Outer Tracker system, describing the new layout and technological choices together with some highlights of research and development activities.

  15. The Israeli EA-FEL Upgrade Towards Long Pulse Operation for Ultra-High Resolution Single Pulse Coherent Spectroscopy

    CERN Document Server

    Gover, A; Kanter, M; Kapilevich, B; Litvak, B; Peleg, S; Socol, Y; Volshonok, M

    2005-01-01

    The Israeli Electrostatic Accelerator FEL (EA-FEL) is now being upgraded towards long pulse (1005s) operation and ultra-high resolution (10(-6)) single pulse coherent spectroscopy. We present quantitative estimations regarding the applications of controlled radiation chirp for spectroscopic applications with pulse-time Fourier Transform limited spectral resolution. Additionally, we describe a novel extraction-efficiency-improving scheme based on increase of accelerating voltage (boosting) after saturation is achieved. The efficiency of the proposed scheme is confirmed by theoretical and numerical calculations. The latter are performed using software, based on 3D space-frequency domain model. The presentation provides an overview of the upgrade status: the high-voltage terminal is being reconfigured to accept the accelerating voltage boost system; a new broad band low-loss resonator is being manufactured; multi-stage depressed collector is assembled.

  16. ATLAS Future Plans: Upgrade and the Physics with High Luminosity

    Directory of Open Access Journals (Sweden)

    Rajagopalan S.

    2013-05-01

    Full Text Available The ATLAS experiment is planning a series of detector upgrades to cope with the planned increases in instantaneous luminosity and multiple interactions per crossing to maintain its physics capabilities. During the coming decade, the Large Hadron Collider will collide protons on protons at a center of mass energy up to 14 TeV with luminosities steadily increasing in a phased approach to over 5 × 1034 cm−2s−1. The resulting large data sets will significantly enhance the physics reach of the ATLAS detector building on the recent discovery of the Higgs-like boson. The planned detector upgrades being designed to cope with the increasing luminosity and its impact on the ATLAS physics program will be discussed.

  17. Upgrades to the SPS-to-LHC Transfer Line Beam Stoppers for the LHC High-Luminosity Era

    CERN Document Server

    Kain, Verena; Fraser, Matthew; Goddard, Brennan; Meddahi, Malika; Perillo Marcone, Antonio; Steele, Genevieve; Velotti, Francesco

    2016-01-01

    Each of the 3 km long transfer lines between the SPS and the LHC is equipped with two beam stoppers (TEDs), one at the beginning of the line and one close to the LHC injection point, which need to absorb the full transferred beam. The beam stoppers are used for setting up the SPS extractions and transfer lines with beam without having to inject into the LHC. Energy deposition and thermo-mechanical simulations have, however, shown that the TEDs will not be robust enough to safely absorb the high intensity beams foreseen for the high-luminosity LHC era. This paper will summarize the simulation results and limitations for upgrading the beam stoppers. An outline of the hardware upgrade strategy for the TEDs together with modifications to the SPS extraction interlock system to enforce intensity limitations for beam on the beam stoppers will be given.

  18. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  19. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  20. Prospects of a search for $t\\bar{t}$ resonances at the High Luminosity LHC with an upgraded ATLAS Detector

    CERN Document Server

    Duncan, Anna Kathryn; The ATLAS collaboration

    2017-01-01

    A study of the expected mass reach of a search for new high-mass resonances decaying to a top quark pair using a simulation of the upgraded ATLAS experiment and using an integrated luminosity of 3000 fb$^{-1}$ from the High Luminosity LHC has been made. The simulation of the upgraded ATLAS experiment under HL-LHC conditions, including pileup, was done using parameterised estimates of the performance. Expected upper limits are set on the cross section of a $t\\bar{t}$ resonance in a benchmark model for several signal masses and show that particles with masses up to 4 TeV can be seen.

  1. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1992-01-01

    This paper reports on the Neutral Beam Software Upgrade project which was launched in early 1990. The major goals were to upgrade the MAC IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very user friendly, versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external irterrupts to the system

  2. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  3. Status of the ALICE TPC upgrade for high-rate operation

    Energy Technology Data Exchange (ETDEWEB)

    Gasik, Piotr [TU Muenchen, Physik Department E12, Excellence Cluster ' ' Universe' ' , D-85748, Garching (Germany); Collaboration: ALICE-Collaboration

    2015-07-01

    A large Time Projection Chamber (TPC) is the main device for tracking and charged particle identification in the ALICE experiment at the CERN LHC. After the second long shutdown in 2018/2019, the LHC will deliver Pb beams colliding at an interaction rate of about 50 kHz, which is about a factor of 100 above the present readout rate of the TPC. This will result in a significant improvement on the sensitivity of rare probes that are considered key observables to characterise the hot and dense QCD matter created in such collisions. In order to make full use of this luminosity, a major upgrade of the TPC is required. It is foreseen to replace the existing MWPC-based readout chambers by Gas Electron Multiplier (GEM) detectors to overcome the rate limitations imposed by the present gated readout scheme. An extensive R and D program has been launched to reach the challenging requirements of the upcoming upgrade of the detector. In this presentation the most recent results are discussed concerning ion backflow suppression, gain stability, energy and dE/dx resolution and stability against discharges. The status of the upgrade of the online calibration and data reduction system, which includes advanced techniques for online corrections of space-charge distortions, as well as the development of a new readout electronics are reported.

  4. Securing budget for and implementing your significant simulator upgrade: The Fermi experience

    International Nuclear Information System (INIS)

    Crone, B.D.

    2006-01-01

    Detroit Edison has selected CAE to perform a total simulator upgrade (with the exception of the panel hardware and I/O system) of the Fermi 2 station simulator. The upgrade is intended to improve the performance of the simulator (and thus training effectiveness) while reducing associated operating costs by utilizing an industry standard operating platform, software applications, and off the shelf PC based computer hardware. Additionally, the upgrade is intended to provide the ability to conduct classroom presentations through the use of desktop simulators. Because the cost of a total upgrade is considerable, substantial work is necessary to convince site management that such an undertaking is necessary, can be performed efficiently, and that a return on investment is even possible. This effort was compounded by the lingering history of a previous simulator upgrade, which was completed considerably over-budget and beyond the intended Ready for Training date. As of this writing, the Fermi 2 Simulator Upgrade using CAE products is approximately 60% complete. This paper will describe the methods used to procure funding, as well as steps taken following funding approval to keep the project on track for successful completion. (author)

  5. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  6. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  7. Upgrading of the radiation protection system at the V1 NPP

    International Nuclear Information System (INIS)

    Dobis, L.; Kaizer, J.; Svitek, J.

    2003-01-01

    The original radiation protection system at Bohunice V1 NPP from the 1970s was upgraded so as to meet current national as well as international standards. The article describes the upgrading of the radiation control system (teledosimetry, emergency measurement in the hermetic zone, liquid discharges, gaseous discharges, service water, remote measurement, hygiene loop, contamination monitoring at the controlled zone exit and activity monitoring at the NPP exit, special laundry, instrument calibration), dosimetry, software, and personnel contamination inspection/measurement. (author)

  8. Upgrade of ATLAS ITk Pixel Detector

    CERN Document Server

    Huegging, Fabian; The ATLAS collaboration

    2017-01-01

    The high luminosity upgrade of the LHC (HL-LHC) in 2026 will provide new challenges to the ATLAS tracker. The current inner detector will be replaced with an entirely-silicon inner tracker (ITk) which will consist of a five barrel layer Pixel detector surrounded by a four barrel layer Strip detector. The expected high radiation levels are requiring the development of upgraded silicon sensors as well as new a front-end chip. The dense tracking environment will require finer granularity detectors and low mass global and local support structures. The data rates will require new technologies for high bandwidth data transmission and handling. The current status of the ITk ATLAS Pixel detector developments as well as different layout options will be reviewed.

  9. e+e- interactions at very high energy: searching beyond the standard model

    International Nuclear Information System (INIS)

    Dorfan, J.

    1983-04-01

    These lectures discuss e + e - interactions at very high energies with a particular emphasis on searching the standard model which we take to be SU(3)/sub color/Λ SU(2) Λ U(1). The highest e + e - collision energy exploited to date is at PETRA where data have been taken at 38 GeV. We will consider energies above this to be the very high energy frontier. The lectures will begin with a review of the collision energies which will be available in the upgraded machines of today and the machines planned for tomorrow. Without going into great detail, we will define the essential elements of the standard model. We will remind ourselves that some of these essential elements have not yet been verified and that part of the task of searching beyond the standard model will involve experiments aimed at this verification. For if we find the standard model lacking, then clearly we are forced to find an alternative. So we will investigate how the higher energy e + e - collisions can be used to search for the top quark, the neutral Higgs scalar, provide true verification of the non-Abelian nature of QCD, etc. Having done this we will look at tests of models involving simple extensions of the standard model. Models considered are those without a top quark, those with charged Higgs scalars, with multiple and/or composite vector bosons, with additional generations and possible alternative explanations for the PETRA three jet events which don't require gluon bremsstrahlung. From the simple extensions of the standard model we will move to more radical alternatives, alternatives which have arisen from the unhappiness with the gauge hierarchy problem of the standard model. Technicolor, Supersymmetry and composite models will be discussed. In the final section we will summarize what the future holds in terms of the search beyond the standard model

  10. Chip development in 65 nm CMOS technology for the high luminosity upgrade of the ATLAS pixel detector

    Energy Technology Data Exchange (ETDEWEB)

    Germic, Leonard; Hemperek, Tomasz; Kishishita, Testsuichi; Krueger, Hans; Rymaszewski, Piotr; Wermes, Norbert [University of Bonn, Bonn (Germany); Havranek, Miroslav [University of Bonn, Bonn (Germany); Institute of Physics of the Academy of Sciences, Prague (Czech Republic)

    2015-07-01

    The LHC High Luminosity upgrade will result in a significant change of environment in which particle detectors are going to operate, especially for devices very close to the interaction point like pixel detector electronics. Challenges coming from the higher hit rate will have to be solved by designing faster and more complex circuits, while at the same time keeping in mind very high radiation hardness requirements. Therefore matching the specification set by the high luminosity upgrade requires a large R and D effort. Our group is participating in such a joint development * namely the RD53 collaboration * which goal is to design a new pixel chip using an advanced 65 nm CMOS technology. During this presentation motivations and benefits of using this very deep-submicron technology will be shown together with a comparison with older technologies (130 nm, 250 nm). Most of the talk is allocated to presenting some of the circuits designed by our group, along with their performance measurement results.

  11. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  12. Scenarios for the LHC Upgrade

    CERN Document Server

    Scandale, Walter

    2008-01-01

    The projected lifetime of the LHC low-beta quadrupoles, the evolution of the statistical error halving time, and the physics potential all call for an LHC luminosity upgrade by the middle of the coming decade. In the framework of the CARE-HHH network three principal scenarios have been developed for increasing the LHC peak luminosity by more than a factor of 10, to values above 1035 cm−2s−1. All scenarios imply a rebuilding of the high-luminosity interaction regions (IRs) in combination with a consistent change of beam parameters. However, their respective features, bunch structures, IR layouts, merits and challenges, and luminosity variation with β∗ differ substantially. In all scenarios luminosity leveling during a store would be advantageous for the physics experiments. An injector upgrade must complement the upgrade measures in the LHC proper in order to provide the beam intensity and brightness needed as well as to reduce the LHC turnaround time for higher integrated luminosity.

  13. Upgrade of the GSI-Unilac as a FAIR high current injector

    Energy Technology Data Exchange (ETDEWEB)

    Haehnel, Hendrik [Institut fuer Angewandte Physik, Goethe Universitaet Frankfurt (Germany)

    2016-07-01

    The existing UNIversal Linear Accelerator (UNILAC) at GSI will serve as ion and dedicated uranium ion injector for the Facility for Antiproton and Ion Research (FAIR). For nominal FAIR operation, 15 emA of Uranium 28+ at low emittances have to be injected by multiturn-injection into FAIR. To meet these requirements and to ensure reliable operation, the UNILAC will undergo a significant upgrade process. Upgrade measures concerning key accelerator components are described and a main focus is put on a replacement of the 54m Alvarez-section by a compact IH-DTL. This will open new options for future injection schemes into SIS100.

  14. Physics potential of ATLAS upgrades at HL-LHC

    CERN Document Server

    Testa, Marianna; The ATLAS collaboration

    2017-01-01

    The High Luminosity-Large Hadron Collider (HL-LHC) is expected to start in 2026 and to pro- vide an integrated luminosity of 3000 fb−1 in ten years, a factor 10 more than what will be collected by 2023. This high statistics will allow ATLAS to perform precise measurements in the Higgs sector and improve searches for new physics at the TeV scale. The luminosity needed is L ∼ 7.51034 cm−2 s−1, corresponding to ∼200 additional proton-proton pile- up interactions. To face such harsh environment some sub-detectors of the ATLAS experiment will be upgraded or completely substituted. The performances of the new or upgraded ATLAS sub-detectors are presented, focusing in particular on the new inner tracker and a proposed high granularity time device. The impact of those upgrades on crucial physics measurements for HL-LHC program is also shown.

  15. Upgrade of ATLAS and CMS for High Luminosity LHC: Detector performance and Physics potential

    International Nuclear Information System (INIS)

    Testa, M.

    2017-01-01

    The High Luminosity Large Hadron Collider (HL-LHC) is expected to start providing proton-proton collisions by 2026. In the following 10 years it will deliver about 3000 fb −1 of integrated luminosity, more than a factor 10 of the data that will be collected by the end of Run3 at LHC in 2023. For such amount of data, an instantaneous luminosity of ∼ 7.5 × 10 34 cm −2 s −1 is needed. At this luminosity an unprecedented average number of pile-up collision per bunch crossing of 200 is expected. The ATLAS and CMS detectors will be upgraded to fully exploit the HL-LHC potential in this harsh environment. In this document the performances of the ATLAS and CMS upgraded detectors will be described. Their impact on crucial measurements of the Higgs boson sector, of the vector boson fusion process and on new physics searches, will be reported as well.

  16. Status of High Flux Isotope Reactor (HFIR) post-restart safety analysis and documentation upgrades

    International Nuclear Information System (INIS)

    Cook, D.H.; Radcliff, T.D.; Rothrock, R.B.; Schreiber, R.E.

    1990-01-01

    The High Flux Isotope Reactor (HFIR), an experimental reactor located at the Oak Ridge National Laboratory (ORNL) and operated for the US Department of Energy by Martin Marietta Energy Systems, was shut down in November, 1986 after the discovery of unexpected neutron embrittlement of the reactor vessel. The reactor was restarted in April, 1989, following an extensive review by DOE and ORNL of the HFIR design, safety, operation, maintenance and management, and the implementation of several upgrades to HFIR safety-related hardware, analyses, documents and procedures. This included establishing new operating conditions to provide added margin against pressure vessel failure, as well as the addition, or upgrading, of specific safety-related hardware. This paper summarizes the status of some of the follow-on (post-restart) activities which are currently in progress, and which will result in a comprehensive set of safety analyses and documentation for the HFIR, comparable with current practice in commercial nuclear power plants. 8 refs

  17. Low mass hybrid pixel detectors for the high luminosity LHC upgrade

    CERN Document Server

    Gonella, Laura; Desch, Klaus

    2013-11-11

    Reducing material in silicon trackers is of major importance for a good overall detector performance, and poses severe challenges to the design of the tracking system. To match the low mass constraints for trackers in High Energy Physics experiments at high luminosity, dedicated technological developments are required. This dissertation presents three technologies to design low mass hybrid pixel detectors for the high luminosity upgrades of the LHC. The work targets specifically the reduction of the material from the detector services and modules, with novel powering schemes, flip chip and interconnection technologies. A serial powering scheme is prototyped, featuring a new regulator concept, a control and protection element, and AC-coupled data transmission. A modified flip chip technology is developed for thin, large area Front-End chips, and a via last Through Silicon Via process is demonstrated on existing pixel modules. These technologies, their developments, and the achievable material reduction are dis...

  18. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  19. Modern Housing Retrofit: Assessment of Upgrade Packages to EnerPHit Standard for 1940–1960 State Houses in Auckland

    Directory of Open Access Journals (Sweden)

    Paola Leardini

    2015-03-01

    Full Text Available New Zealand state housing includes a significant portion of problematic buildings constructed after the public housing scheme launched in 1936. Most of these houses are still uninsulated, thus, cold, draughty, mouldy, and progressively decaying; however, as they are fundamental elements of the country’s culture, society, and environment, and are built with good quality materials and sound construction, they are suitable candidates for effective energy upgrades. This paper presents findings of a study on problems and opportunities of retrofitting the state houses built between 1940 and 1960 in the Auckland region. It advocates strategic national policies and initiatives for retrofitting, based on more challenging performance thresholds. The research defines and virtually implements an incremental intervention strategy including different retrofit packages for a typical 1950s stand-alone house. Indoor and outdoor environmental parameters were monitored over a year, and data used to establish a base case for thermal simulation. The upgrade packages were then modelled to assess their impact on the house’s thermal performance, comparing heating requirements and comfort of various insulation and ventilation options. The paper reports on effective ways of preserving the integrity of such a house, while improving its thermal performance to the EnerPHit standard, and discusses the benefits of introducing this holistic approach into New Zealand retrofit practice.

  20. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  1. Software upgrade for the DIII-D neutral beam control systems

    International Nuclear Information System (INIS)

    Cummings, J.W.; Thurgood, P.A.

    1991-11-01

    The neutral beams are used to heat the plasma in the DIII-D tokamak, a fusion energy research experiment operated by General Atomics (GA) and funded by the Department of Energy (DOE). The experiment is dedicated to demonstrating noninductive current drive of high beta high temperature divertor plasma with good confinement. The neutral beam heating system for the DIII-D tokamak uses four MODCOMP Classic computers for data acquisition and control of the four beamlines. The Neutral Beam Software Upgrade project was launched in early 1990. The major goals were to upgrade the MAX IV operating system to the latest revision (K.1), use standard MODCOMP software (as much as possible), and to develop a very ''user friendly,'' versatile system. Accomplishing these goals required new software to be developed and modifications to existing applications software to make it compatible with the latest operating system. The custom operating system modules to handle the message service and interrupt handling were replaced by the standard MODCOMP Inter Task Communication (ITC) and interrupt routines that are part of the MAX IV operating system. The message service provides the mechanism for doing shot task sequencing (task scheduling). The interrupt routines are used to connect external interrupts to the system. The new software developed consists of a task dispatcher, screen manager, and interrupt tasks. The existing applications software had to be modified to be compatible with the MODCOMP ITC services and consists of the Modcomp Infinity Data Base Manager, a multi-user system, and menu-driven operating system interface routines using the Infinity Data Base Manager

  2. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  3. NSTX-U Control System Upgrades

    International Nuclear Information System (INIS)

    Erickson, K.G.; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-01-01

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control

  4. NSTX-U Control System Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Erickson, K.G., E-mail: kerickso@pppl.gov; Gates, D.A.; Gerhardt, S.P.; Lawson, J.E.; Mozulay, R.; Sichta, P.; Tchilinguirian, G.J.

    2014-06-15

    The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

  5. Combination of Eastern and Western technology in VVER 1000 NPP upgrade

    International Nuclear Information System (INIS)

    Ubra, O.

    1997-01-01

    An extensive modernization program is presented for upgrading the two WWER-type units of nuclear power plant Temelin to meet the latest international safety standards. The following innovations have been implemented: modernization and upgrading of the safety and control systems, new fuel design and modification of the reactor core, new diagnostic system, innovations of some components and subsystems of the primary and secondary systems, design and construction of a full scope simulator, the improvement of safety documentation, development of the Probabilistic Safety Assessment programme. (M.D.)

  6. Efficient Ways to Upgrade Docker Containers in Cloud to Support Backward Compatibility : Various Upgrade Strategies to Measure Complexity

    OpenAIRE

    MADALA, SRAVYA

    2016-01-01

    If the present world scenario in telecommunication systems is considered thousands of systems are getting moved into the cloud because of its wide features. This thesis explains the efficient ways to upgrade Docker containers in a way to support backward compatibility. It mainly concerns about the high-availability of systems in the cloud environment during upgrades. Smaller changes can be implemented automatically to some extent. The minor changes can be handled by Apache Avro where schema i...

  7. Upgrade of the global muon trigger at the CMS experiment

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00282545; Sakulin, Hannes

    2016-09-14

    The Compact Muon Solenoid (CMS) experiment is one of two general purpose detectors at the Large Hadron Collider (LHC) at the particle physics research laboratory in Geneva (CERN). As such it allows a broad array of physics analyses from precision measurements of the standard model of particle physics to searches for exotic new particles. A series of upgrades and maintenance procedures took place in the first shut down from 2013 to 2015. The aim was to prepare the LHC for the collision energy of 13 TeV and further increase its luminosity. During this shut down also upgrades of the CMS experiment were installed.Due to the high rate of collisions at the LHC, it is impossible to record all such events. In order to reduce the event rate to a manageable level, a trigger system is deployed that selects interesting events. At the CMS experiment this system is divided into two levels: A first hardware based system that is optimised for speed and a second that is software based and applies more time consuming and preci...

  8. The CMS Tracker upgrade for HL-LHC

    CERN Document Server

    Ahuja, Sudha

    2017-01-01

    The LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5 $\\times$ $10^{34} $cm$^{-2}$s$^{-1}$ in 2028, to possibly reach an integrated luminosity of 3000 fb$^{-1}$ by the end of 2037. This High Luminosity LHC scenario, HL-LHC, will require a preparation program of the LHC detectors known as Phase-2 upgrade. The current CMS Outer Tracker, already running beyond design specifications, and CMS Phase1 Pixel Detector will not be able to survive HL-LHC radiation conditions and CMS will need completely new devices, in order to fully exploit the high-demanding operating conditions and the delivered luminosity. The new Outer Tracker should have also trigger capabilities. To achieve such goals, R$\\&$D activities are ongoing to explore options both for the Outer Tracker, and for the pixel Inner Tracker. Solutions are being developed that would allow including tracking information at Level-1. The design choices for the Tracker upgrades are discussed along with some highlights...

  9. A demonstrated method for upgrading existing control room interiors

    International Nuclear Information System (INIS)

    Brice, R.M.; Terrill, D.; Brice, R.M.

    1991-01-01

    The main control room (MCR) of any nuclear power plant can justifiably be called the most important area staffed by personnel in the entire facility. The interior workstation configuration, equipment arrangement, and staff placement all affect the efficiency and habitability of the room. There are many guidelines available that describe various human factor principles to use when upgrading the environment of the MCR. These involve anthropometric standards and rules for placement of peripheral equipment. Due to the variations in plant design, however, hard-and-fast rules have not and cannot be standardized for retrofits in any significant way. How then does one develop criteria for the improvement of a MCR? The purpose of this paper is to discuss, from the designer's point of view, a method for the collection of information, development of criteria, and creation of a final design for a MCR upgrade. This method is best understood by describing the successful implementation at Tennessee Valley Authority's Sequoyah nuclear plant

  10. Breaking through the bitumen upgrading barriers with the UOP Uniflex Process

    Energy Technology Data Exchange (ETDEWEB)

    Gillis, D. [UOP LLC, Des Plaines, IL (United States)

    2009-07-01

    High costs and environmental concerns are some of the challenges facing bitumen upgrading. In addition, yields from conventional process such as coking and ebullated bed hydrocracking are much lower than desired. As such, there is a need for processes that can maximize conversion and selectively produce transportation boiling range products, particularly distillates. There are both technical and financial challenges in providing a reliable high-conversion technology. UOP has developed the UOP Uniflex Process, a commercially based high-conversion residue upgrading process that selectively converts residues from conventional crude oils and bitumen to transportation fuels and high quality synthetic crude oil. The unique features of this technology were described along with commercialization background. Recent advances being developed by UOP under the AERI Hydrocarbon Upgrading Demonstration Program were also described, with particular reference to catalyst design, engineering design and residue by-product utilization. This presentation also outlined UOP's latest flow scheme options for use with existing upgrading technologies. tabs., figs.

  11. High-Risk Breast Lesions: A Machine Learning Model to Predict Pathologic Upgrade and Reduce Unnecessary Surgical Excision.

    Science.gov (United States)

    Bahl, Manisha; Barzilay, Regina; Yedidia, Adam B; Locascio, Nicholas J; Yu, Lili; Lehman, Constance D

    2018-03-01

    Purpose To develop a machine learning model that allows high-risk breast lesions (HRLs) diagnosed with image-guided needle biopsy that require surgical excision to be distinguished from HRLs that are at low risk for upgrade to cancer at surgery and thus could be surveilled. Materials and Methods Consecutive patients with biopsy-proven HRLs who underwent surgery or at least 2 years of imaging follow-up from June 2006 to April 2015 were identified. A random forest machine learning model was developed to identify HRLs at low risk for upgrade to cancer. Traditional features such as age and HRL histologic results were used in the model, as were text features from the biopsy pathologic report. Results One thousand six HRLs were identified, with a cancer upgrade rate of 11.4% (115 of 1006). A machine learning random forest model was developed with 671 HRLs and tested with an independent set of 335 HRLs. Among the most important traditional features were age and HRL histologic results (eg, atypical ductal hyperplasia). An important text feature from the pathologic reports was "severely atypical." Instead of surgical excision of all HRLs, if those categorized with the model to be at low risk for upgrade were surveilled and the remainder were excised, then 97.4% (37 of 38) of malignancies would have been diagnosed at surgery, and 30.6% (91 of 297) of surgeries of benign lesions could have been avoided. Conclusion This study provides proof of concept that a machine learning model can be applied to predict the risk of upgrade of HRLs to cancer. Use of this model could decrease unnecessary surgery by nearly one-third and could help guide clinical decision making with regard to surveillance versus surgical excision of HRLs. © RSNA, 2017.

  12. Injection Protection Upgrade for the HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067108; Biancacci, Nicolo; Bracco, Chiara; Frasciello, Oscar; Gentini, Luca; Goddard, Brennan; Lechner, Anton; Maciariello, Fausto; Perillo Marcone, Antonio; Salvant, Benoit; Shetty, Nikhil Vittal; Steele, Genevieve; Velotti, Francesco; Zobov, Mikhail

    2015-01-01

    The injector complex of the LHC is undergoing important changes in the light of the LIU project to provide brighter beams to the LHC. For this reason and as part of the High Luminosity LHC project the injection protection system of the LHC will be upgraded in the Long Shutdown 2 (2018 - 2019) to be able to protect downstream elements against injection failures with the high brightness, high intensity HL-LHC beams. The upgraded LHC injection protection system will consist of a segmented injection protection absorber TDIS, and auxiliary collimators and masks. The layout modifications are described, and the machine element protection and absorber jaw robustness studies are presented for the new systems.

  13. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    International Nuclear Information System (INIS)

    Graca, S.; Santos, J.; Manso, M.E.

    2004-01-01

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut fuer Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusao Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls

  14. Upgrade to the control system of the reflectometry diagnostic of ASDEX upgrade

    Science.gov (United States)

    Graça, S.; Santos, J.; Manso, M. E.

    2004-10-01

    The broadband frequency modulation-continuous wave microwave/millimeter wave reflectometer of ASDEX upgrade tokamak (Institut für Plasma Physik (IPP), Garching, Germany) developed by Centro de Fusão Nuclear (Lisboa, Portugal) with the collaboration of IPP, is a complex system with 13 channels (O and X modes) and two types of operation modes (swept and fixed frequency). The control system that ensures remote operation of the diagnostic incorporates VME and CAMAC bus based acquisition/timing systems. Microprocessor input/output boards are used to control and monitor the microwave circuitry and associated electronic devices. The implementation of the control system is based on an object-oriented client/server model: a centralized server manages the hardware and receives input from remote clients. Communication is handled through transmission control protocol/internet protocol sockets. Here we describe recent upgrades of the control system aiming to: (i) accommodate new channels; (ii) adapt to the heterogeneity of computing platforms and operating systems; and (iii) overcome remote access restrictions. Platform and operating system independence was achieved by redesigning the graphical user interface in JAVA. As secure shell is the standard remote access protocol adopted in major fusion laboratories, secure shell tunneling was implemented to allow remote operation of the diagnostic through the existing firewalls.

  15. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  16. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  17. System upgrade on Philips Allura FD20 angiography systems: effects on patient skin dose and static image quality

    International Nuclear Information System (INIS)

    Ryckx, Nick; Sans-Merce, Marta; Meuli, Reto; Zerlauth, Jean-Baptiste; Verdun, Francis R.

    2016-01-01

    Fluoroscopically guided procedures might be highly irradiating for patients, possibly leading to skin injuries. In such a context, every effort should be done to lower patient exposure as much as possible. Moreover, patient dose reduction does not only benefit to the patient but also allows reducing staff exposure. In this framework, Philips Healthcare recently introduced a system upgrade for their angiography units, called 'AlluraClarity'. The authors performed air kerma rate measurements for all available fluoroscopy modes and air kerma per frame measurements for the digital subtraction angiography protocols, along with subjective spatial resolution and low-contrast detectability assessments using a standard QA phantom. Air kerma reductions ranging from 25.5 to 84.4 % were found, with no significant change in image quality when switching from a standard operating mode to an upgraded version. These results are confirmed by the comparison of actual patient exposures for similar procedures. (authors)

  18. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  19. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  20. MAPS development for the ALICE ITS upgrade

    OpenAIRE

    Yang, P; Aglieri, G; Cavicchioli, C; Chalmet, P L; Chanlek, N; Collu, A; Gao, C; Hillemanns, H; Junique, A; Kofarago, M; Keil, M; Kugathasan, T; Kim, D; Kim, J; Lattuca, A

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging senso...

  1. LHCb VELO Upgrade

    CERN Document Server

    van Beuzekom, Martin; Ketel, Tjeerd; Gershon, Timothy; Parkes, Christopher; Reid, Matthew

    2011-01-01

    The VErtex LOcator (VELO) is a vital piece of apparatus for allowing precision measurements in hadronic physics. It provides not only superb impact parameter resolutions but also excellent momentum resolution, both important discriminating tools for precision high energy physics. This poster focuses on the R&D going into the future LHCb VELO detector. At present there are two proposed options for the upgrade; pixel chips or strip detectors. The LHCb upgrade is designed with higher luminosities and increased yields in mind. In order to get more out of the LHCb detector changes to the front end electronics will have to be made. At present, the first level hardware trigger is sets a limiting factor on the maximum efficiency for hadronic channels. As the VELO is positioned so close the proton-proton interaction region, whatever the choice of sensor, we will require efficient cooling and some proposed solutions are outlined. The LHCb TimePix telescope has had a very successful years running, with various devic...

  2. The JLab 12 GeV Energy Upgrade of CEBAF for QCD and Hadronic Physics

    International Nuclear Information System (INIS)

    Lawrence Cardman; Leigh Harwood

    2007-01-01

    CEBAF at Jefferson Lab is a 5-pass, recirculating cw electron linac operating at ∼6 GeV and devoted to basic research in nuclear physics. The 12 GeV Upgrade is a major project, sponsored by the DOE Office of Nuclear Physics, that will expand its research capabilities substantially by doubling the maximum energy and adding major new experimental apparatus. We anticipate that the project will receive Critical Decision 2 approval this year and begin construction in 2008. The research program motivating the Upgrade includes: the study of hybrid mesons, which involve excited states of the glue, to explore the nature of quark confinement; dramatic improvements in our understanding of the QCD structure of the hadrons through the extension of our knowledge of their parton distribution functions to high xBjorken, where they are dominated by underlying valence quark structure, and a program of nucleon ''tomography'' via measurements of the Generalized Parton Distributions (GPDs), a broad program of experiments in the physics of nuclei that aims to understand the QCD basis for the nucleon-nucleon force and how nucleons and mesons arise as an approximation to the underlying quark-gluon structure; and precision tests of the Standard Model through parity violating deep inelastic and Moeller scattering. The Upgrade includes: doubling the accelerating voltages of the linacs by adding 10 new high-performance cryomodules; the requisite expansion of the 2K cryogenics plant and rf power systems to support these cryomodules; upgrading the beam transport system from 6 to 12 GeV through extensive re-use and/or modification of existing hardware; and the addition of one recirculation arc, a new experimental area, and the beamline to it; and the construction of major new experimental equipment for the GPD, high-xBjorken, and hybrid meson programs. The presentation will describe the science briefly and provide some details about the accelerator plans

  3. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  4. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5x compared to the design luminosity (10^34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade is expected to happen around 2023. The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 ...

  5. The MAST data acquisition upgrade

    International Nuclear Information System (INIS)

    McArdle, G.J.; Shibaev, Sergei; Storrs, John; Thomas-Davies, Nigel; Stephen, Robert

    2010-01-01

    A programme has begun on MAST to replace its ageing CAMAC and VME based data acquisition systems with new modern hardware which, together with several improvements in the supporting infrastructure, will provide support for faster data acquisition rates, longer-pulse operation, faster data access and higher reliability. The main principle of the upgrade was to use commercial off-the-shelf (COTS) hardware and well-established standards wherever possible. CompactPCI or PXI was chosen as the digitiser form factor to replace CAMAC/VME, and Ethernet would be used as the means to access all devices. The modular architecture of the MAST data acquisition software framework has helped to minimise the integration effort required to phase in new subsystems and/or new technologies whilst continuing to use the old hardware in other systems. The software framework was updated to allow more versatile use of the network-attached data acquisition devices. The new data acquisition devices had multiple connector types, which created difficulties with the cable interfacing. To resolve this and provide support for easy substitution, a standard connector interface was chosen, based on the most common connector type and pin-out already in use, and several cable assemblies were produced to connect the proprietary interface of the digitiser to the standard interface block. The in-house IDA-3 data storage format is unable to accommodate the larger file sizes and is increasingly difficult to maintain, so it is to be gradually phased out. The NetCDF-4/HDF5 data standard is being adopted as its replacement, thus reducing in-house maintenance whilst providing a data format that is more accessible to the Fusion community. Several other infrastructure upgrades were necessitated by the anticipated increase in data traffic and volume including the Central Timing System, the MAST Ethernet infrastructure and servers for front-end data processing, data storage and data access management. These

  6. Beam dynamics studies of the ISOLDE post-accelerator for the high intensity and energy upgrade

    CERN Document Server

    Fraser, M A

    2012-01-01

    The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotope Mass Separator) nuclear facility at CERN with a mandate to significantly increase the energy, intensity and quality of the radioactive nuclear beams provided to the European nuclear physics community for research at the forefront of topics such as nuclear structure physics and nuclear astrophysics. The HIE-ISOLDE project focuses on the upgrade of the existing Radioactive ion beam EXperiment (REX) post-accelerator with the addition of a 40MVsuperconducting linac comprising 32 niobium sputter-coated copper quarter-wave cavities operating at 101.28 MHz and at an accelerating gradient close to 6 MV/m. The energy of post-accelerated radioactive nuclear beams will be increased from the present ceiling of 3 MeV/u to over 10 MeV/u, with full variability in energy, and will permit, amongst others, Coulomb interaction and few-nucleon transfer reactions to be carried out on the full inventory of radionuclides available ...

  7. Beam Dynamics Studies of the ISOLDE Post-accelerator for the High Intensity and Energy Upgrade

    CERN Document Server

    Fraser, Matthew Alexander; Pasini, M

    2012-01-01

    The High Intensity and Energy (HIE) project represents a major upgrade of the ISOLDE (On-Line Isotope Mass Separator) nuclear facility at CERN with a mandate to significantly increase the energy, intensity and quality of the radioactive nuclear beams provided to the European nuclear physics community for research at the forefront of topics such as nuclear structure physics and nuclear astrophysics. The HIE-ISOLDE project focuses on the upgrade of the existing Radioactive ion beam EXperiment (REX) post-accelerator with the addition of a 40MVsuperconducting linac comprising 32 niobium sputter-coated copper quarter-wave cavities operating at 101.28 MHz and at an accelerating gradient close to 6 MV/m. The energy of post-accelerated radioactive nuclear beams will be increased from the present ceiling of 3 MeV/u to over 10 MeV/u, with full variability in energy, and will permit, amongst others, Coulomb interaction and few-nucleon transfer reactions to be carried out on the full inventory of radionuclides available ...

  8. Fusion of eastern and western technology in VVER 1000 NPP upgrade

    International Nuclear Information System (INIS)

    Ubra, O.; Fleischhans, J.; Kveton, M.

    1997-01-01

    An extensive modernization program upgrading two units of VVER 1000 type of the Czech nuclear power plant (NPP) Temelin to meet the latest international standards is presented. The program is based primarily on combination of eastern and western technology and it has been implemented during plant construction. The NPP Temelin was originally designed according to the standards of the former Soviet Union. After a series of reviews in the 1990s, a decision was made by the Temelin management of upgrade the design of the plant, including the supply of fuel and instrumentation and control system by a western company. The adoption of western technology and practices has helped to solve a large number of IAEA safety issues related to design and operation of VVER 1000 NPP. Details on the current Temelin design and other related safety matters are presented

  9. Analysis and upgrade of instrumentation and control systems for the modernization of research reactors

    International Nuclear Information System (INIS)

    1988-01-01

    This document provides assistance in the review and planning process for the upgrade of instrumentation and control systems (I and C systems) and related safety features of the reactor protection system for research reactors. In the interest of safety a need was realized to evaluate the performance of outdated I and C systems. An advisory group was assembled to develop guidelines and to provide recommendations for the upgrade of I and C systems. The recommendations on I and C systems upgrade contained in this document were developed by the advisory group using as guidelines the established safety criteria and operating standards for research reactors. 24 refs

  10. ATLAS Tile Calorimeter Readout Electronics Upgrade Program for the High Luminosity LHC

    CERN Document Server

    Cerqueira, A S; The ATLAS collaboration

    2013-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the most central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The ATLAS upgrade program is divided in three phases: The Phase 0 occurs during 2013-2014 and prepares the LHC to reach peak luminosities of 1034 cm2s-1; Phase 1, foreseen for 2018-1019, prepares the LHC for peak luminosity up to 2-3 x 1034 cm2s-1, corresponding to 55 to 80 interactions per bunch-crossing with 25 ns bunch interval; and Phase 2 is foreseen for 2022-2023, whereafter the peak luminosity will reach 5-7 x 1034 cm2s-1 (HL-LHC). With luminosity leveling, the average luminosity will increase with a factor 10. The main TileCal upgrade is focused on the HL-LHC period. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. All new electronics must be able to cope with the increased rad...

  11. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  12. ATLAS upgrades for the next decades

    CERN Document Server

    Hopkins, Walter; The ATLAS collaboration

    2014-01-01

    After the successful LHC operation at the center-of-mass energies of 7 and 8 TeV in 2010-2012, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the dataset from about few hundred \\ifb\\ expected for LHC running to 3000 fb$^{-1}$ by around 2035 for ATLAS and CMS. In parallel, the experiments need to be keep lockstep with the accelerator to accommodate running beyond the nominal luminosity this decade. Current planning in ATLAS envisions significant upgrades to the detector during the consolidation of the LHC to reach full LHC energy and further upgrades. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for...

  13. Primary Vertex Reconstruction for Upgrade at LHCb

    CERN Document Server

    Wanczyk, Joanna

    2016-01-01

    The aim of the LHCb experiment is the study of beauty and charm hadron decays with the main focus on CP violating phenomena and searches for physics beyond the Standard Model through rare decays. At the present, the second data taking period is ongoing, which is called Run II. After 2018 during the long shutdown, the replacement of signicant parts of the LHCb detector is planned. One of main changes is upgrade of the present software and hardware trigger to a more rapid full software trigger. Primary Vertex (PV) is a basis for the further tracking and it is sensitive to the LHC running conditions, which are going to change for the Upgrade. In particular, the center-of-mass collision energy should reach the maximum value of 14 TeV. As a result the quality of the reconstruction has to be studied and the reconstruction algorithms have to be optimized.

  14. A Review of Hydrothermal Liquefaction Bio-Crude Properties and Prospects for Upgrading to Transportation Fuels

    Directory of Open Access Journals (Sweden)

    Jerome A. Ramirez

    2015-07-01

    Full Text Available Hydrothermal liquefaction (HTL presents a viable route for converting a vast range of materials into liquid fuel, without the need for pre-drying. Currently, HTL studies produce bio-crude with properties that fall short of diesel or biodiesel standards. Upgrading bio-crude improves the physical and chemical properties to produce a fuel corresponding to diesel or biodiesel. Properties such as viscosity, density, heating value, oxygen, nitrogen and sulphur content, and chemical composition can be modified towards meeting fuel standards using strategies such as solvent extraction, distillation, hydrodeoxygenation and catalytic cracking. This article presents a review of the upgrading technologies available, and how they might be used to make HTL bio-crude into a transportation fuel that meets current fuel property standards.

  15. ATLAS Transition Region Upgrade at Phase-1

    CERN Document Server

    Song, H; The ATLAS collaboration

    2014-01-01

    This report presents the L1 Muon trigger transition region (1.0<|ƞ|<1.3) upgrade of ATLAS Detector at phase-1. The high fake trigger rate in the Endcap region 1.0<|ƞ|<2.4 would become a serious problem for the ATLAS L1 Muon trigger system at high luminosity. For the region 1.3<|ƞ|<2.4, covered by the Small Wheel, ATLAS is enhancing the present muon trigger by adding local fake rejection and track angle measurement capabilities. To reduce the rate in the remaining ƞ interval it has been proposed a similar enhancement by adding at the edge of the inner barrel a structure of 3-layers RPCs of a new generation. These RPCs will be based on a thinner gas gap and electrodes with respect to the ATLAS standards, a new high performance Front End, integrating fast TDC capabilities, and a new low profile and light mechanical structure allowing the installation in the tiny space available.This design effectively suppresses fake triggers by making the coincidence with both end-cap and interaction point...

  16. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  17. I and C upgrading at nuclear power plants

    International Nuclear Information System (INIS)

    Tamiri, A.

    2003-01-01

    Continuing the operation of existing nuclear power plants will help reduce the number of new base-load nuclear and fossil power plants that need to be built. Old nuclear power plants in Canada are operating with analog instrumentation and control systems. For a number of reasons, such as changes and improvements in the applicable standards and design, maintenance problems due to the lack of spares, technical obsolescence, the need to increase power production, availability, reliability and safety, and in order to reduce operation and maintenance costs, instrumentation and control upgrading at nuclear power plants in a cost effective manner should be considered the greatest priority. Failures of instrumentation and control (I and C) due to aging and obsolescence issues may have an immediate negative impact on plant reliability and availability and also affect long-term plant performance and safety. In today's competitive marketplace, power plants are under pressure to cut spending on maintenance while reducing the risk of equipment failure that could cause unplanned outage. To improve plant safety and availability, old nuclear power plants will require investment in new technologies that can improve the performance and reduce the costs of generation by addressing the long term reliability of systems by up-grading to modem digital instrumentation and control and optimization opportunities. Boiler drum level control at nuclear power plants is critical for both plant protection and equipment safety and applies equality to high and low levels of water within the boiler drum. Plant outage studies at Pickering Nuclear have identified boiler drum level control and feed water control systems as major contributors to plant unavailability. Ways to improve transient and steady state response, upgrading existing poor analog control systems for boiler level and feed-water control systems at Pickering Nuclear, with enhanced and robust controller will be discussed in this paper

  18. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  19. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  20. Use of ultrasound in petroleum residue upgradation

    Energy Technology Data Exchange (ETDEWEB)

    Sawarkar, A.N.; Pandit, A.B.; Samant, S.D.; Joshi, J.B. [Mumbai Univ., Mumbai (India). Inst. of Chemical Technology

    2009-06-15

    The importance of bottom-of-the barrel upgrading has increased in the current petroleum refining scenario because of the progressively heavier nature of crude oil. Heavy residues contain large concentrations of metals such as vanadium and nickel which foul catalysts and reduce the potential effect of residue fluidized catalytic cracking. This study showed that the cavitational energy induced by ultrasound be be successfully used to upgrade hydrocarbon mixtures. Conventional processes for the upgrading of residual feedstocks, such as thermal cracking and catalytic cracking, were carried out in the temperature range of 400-520 degrees C. Experiments were performed on 2 vacuum residues, Arabian mix vacuum residue (AMVR) and Bombay high vacuum residue (BHVR) and 1 Haldia asphalt (HA). These were subjected to acoustic cavitation for different reaction times from 15 to 120 minutes at ambient temperature and pressure. Two acoustic cavitation devices were compared, namely the ultrasonic bath and ultrasonic horn. In particular, this study compared the ability of these 2 devices to upgrade the petroleum residues to lighter, more value-added products. Different surfactants were used to examine the effect of ultrasound on upgrading the residue when emulsified in water. In order to better understand the reaction mechanism, a kinetic model was developed based on the constituents of the residue. The ultrasonic horn was found to be more effective in bringing about the upgrading than ultrasonic bath. The study also showed that the acoustic cavitation of the aqueous emulsified hydrocarbon mixture could reduce the asphaltenes content to a greater extent than the acoustic cavitation of non-emulsified hydrocarbon mixture. 20 refs., 11 tabs., 17 figs.

  1. Hardware upgrade for A2 data acquisition

    Energy Technology Data Exchange (ETDEWEB)

    Ostrick, Michael; Gradl, Wolfgang; Otte, Peter-Bernd; Neiser, Andreas; Steffen, Oliver; Wolfes, Martin; Koerner, Tito [Institut fuer Kernphysik, Mainz (Germany); Collaboration: A2-Collaboration

    2014-07-01

    The A2 Collaboration uses an energy tagged photon beam which is produced via bremsstrahlung off the MAMI electron beam. The detector system consists of Crystal Ball and TAPS and covers almost the whole solid angle. A frozen-spin polarized target allows to perform high precision measurements of polarization observables in meson photo-production. During the last summer, a major upgrade of the data acquisition system was performed, both on the hardware and the software side. The goal of this upgrade was increased reliability of the system and an improvement in the data rate to disk. By doubling the number of readout CPUs and employing special VME crates with a split backplane, the number of bus accesses per readout cycle and crate was cut by a factor of two, giving almost a factor of two gain in the readout rate. In the course of the upgrade, we also switched most of the detector control system to using the distributed control system EPICS. For the upgraded control system, some new tools were developed to make full use of the capabilities of this decentralised slow control and monitoring system. The poster presents some of the major contributions to this project.

  2. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  3. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  4. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  5. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  6. Lobular neoplasia detected in MRI-guided core biopsy carries a high risk for upgrade: a study of 63 cases from four different institutions

    Science.gov (United States)

    Khoury, Thaer; Kumar, Prasanna R; Li, Zaibo; Karabakhtsian, Rouzan G; Sanati, Souzan; Chen, Xiwei; Wang, Dan; Liu, Song; Reig, Beatriu

    2017-01-01

    There are certain criteria to recommend surgical excision for lobular neoplasia diagnosed in mammographically detected core biopsy. The aims of this study are to explore the rate of upgrade of lobular neoplasia detected in magnetic resonance imaging (MRI)-guided biopsy and to investigate the clinicopathological and radiological features that could predict upgrade. We reviewed 1655 MRI-guided core biopsies yielding 63 (4%) cases of lobular neoplasia. Key clinical features were recorded. MRI findings including mass vs non-mass enhancement and the reason for biopsy were also recorded. An upgrade was defined as the presence of invasive carcinoma or ductal carcinoma in situ in subsequent surgical excision. The overall rate of lobular neoplasia in MRI-guided core biopsy ranged from 2 to 7%, with an average of 4%. A total of 15 (24%) cases had an upgrade, including 5 cases of invasive carcinoma and 10 cases of ductal carcinoma in situ. Pure lobular neoplasia was identified in 34 cases, 11 (32%) of which had upgrade. In this group, an ipsilateral concurrent or past history of breast cancer was found to be associated with a higher risk of upgrade (6/11, 55%) than contralateral breast cancer (1 of 12, 8%; P = 0.03). To our knowledge, this is the largest series of lobular neoplasia diagnosed in MRI-guided core biopsy. The incidence of lobular neoplasia is relatively low. Lobular neoplasia detected in MRI-guided biopsy carries a high risk for upgrade warranting surgical excision. However, more cases from different types of institutions are needed to verify our results. PMID:26564004

  7. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  8. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  9. High power electron cyclotron heating in ISX and ORMAK Upgrade at ORNL

    International Nuclear Information System (INIS)

    England, A.C.; Eldridge, O.C.; Marcus, F.B.; Sprott, J.C.; Namkung, W.; Wilgen, J.B.

    1976-05-01

    A phased program of plasma heating at the electron cyclotron frequency is proposed for the Oak Ridge tokamaks ISX and ORMAK Upgrade. The past history of the program of electron cyclotron heating (ECH) at ORNL on mirrors and in the ELMO Bumpy Torus has been successful. Future technological developments in the production of high power high frequency microwave tubes look promising at this time. The physics of wave propagation and particle heating are fairly well understood and indicate the viability of this technique. Studies on breakdown and on runaway electron reduction will provide useful information for larger machines. Recent experiments in the USSR on small tokamaks have shown that ECH is a viable heating technique. Providing that the microwave tubes become available, the engineering considerations suggest that the technique is practical and workable, based on present day technology

  10. Upgrade of the ATLAS Liquid Argon Calorimeters for the High-Luminosity LHC

    CERN Document Server

    McCarthy, Tom; The ATLAS collaboration

    2016-01-01

    The increased particle flux at the high luminosity phase of the Large Hadron Collider (HL-LHC), with instantaneous luminosities of up to 7.5 times the original design value, will have an impact on many sub-systems of the ATLAS detector. This contribution highlights the particular impacts on the ATLAS liquid argon calorimeter system, together with an overview of the various upgrade plans leading up to the HL-LHC. The higher luminosities are of particular importance for the forward calorimeters (FCal), where the expected increase in the ionization load poses a number of problems that can degrade the FCal performance such as beam heating and space-charge effects in the liquid argon gaps and high-voltage drop due to increased current drawn over the current-limiting resistors. A proposed FCal replacement as a way to counter some of these problems is weighed against the risks associated with the replacement. To further mitigate the effects of increased pile-up, the installation of a high-granularity timing detector...

  11. A comprehensive review on biodiesel purification and upgrading

    Directory of Open Access Journals (Sweden)

    Hamed Bateni

    2017-09-01

    Full Text Available Serious environmental concerns regarding the use of fossil-based fuels have raised awareness regarding the necessity of alternative clean fuels and energy carriers. Biodiesel is considered a clean, biodegradable, and non-toxic diesel substitute produced via the transesterification of triglycerides with an alcohol in the presence of a proper catalyst. After initial separation of the by-product (glycerol, the crude biodiesel needs to be purified to meet the standard specifications prior to marketing. The presence of impurities in the biodiesel not only significantly affects its engine performance but also complicates its handling and storage. Therefore, biodiesel purification is an essential step prior to marketing. Biodiesel purification methods can be classified based on the nature of the process into equilibrium-based, affinity-based, membrane-based, reaction-based, and solid-liquid separation processes. The main adverse properties of biodiesel – namely moisture absorption, corrosiveness, and high viscosity – primarily arise from the presence of oxygen. To address these issues, several upgrading techniques have been proposed, among which catalytic (hydrodeoxygenation using conventional hydrotreating catalysts, supported metallic materials, and most recently transition metals in various forms appear promising. Nevertheless, catalyst deactivation (via coking and/or inadequacy of product yields necessitate further research. This paper provides a comprehensive overview on the techniques and methods used for biodiesel purification and upgrading.

  12. Upgrade program of the high current heavy ion UNILAC as an injector for FAIR

    International Nuclear Information System (INIS)

    Barth, W.; Bayer, W.; Dahl, L.; Groening, L.; Richter, S.; Yaramyshev, S.

    2007-01-01

    Presently, the GSI facility consists of the heavy ion high current linac UNILAC and the synchrotron SIS 18. For the FAIR project the existing GSI accelerator complex is foreseen to serve as an injector for up to 10 12 U 28+ particles/s on the target. For this purpose an U 28+ beam current of 15 emA inside of the SIS 18 acceptance is required from the UNILAC for the multi-turn injection to the synchrotron up to its space charge limit. Different hardware measures and careful fine tuning in all sections of the UNILAC during the last years resulted in an increase of the beam intensity of up to a factor of seven. To meet the FAIR requirements a further improvement of the beam brilliance at the synchrotron entrance of about a factor of five is necessary. Several upgrade measures are planned and are partially on the realization stage. Simultaneously experimental and numerical studies of the UNILAC are going on and directed to the optimization of the machine and to investigations of the influence of the upgrade measures to the performance of the whole accelerator

  13. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  14. Enhanced E-bed bottoms upgrading using latest catalytic technology

    Energy Technology Data Exchange (ETDEWEB)

    Toshima, H.; Mayo, S.; Sedlacek, Z.; Hughes, T.; De Wind, M. [Albermarle Corp., Amsterdam (Netherlands)

    2009-07-01

    The profitability of refineries depends on heavy oil upgrading in terms of price, conversion, yields and quality of the product. The Ebullated-bed process represents a solution for the effective primary upgrading of heavy oils. Since the 1970s, Albemarle has commercialized several E-bed catalysts to upgrade the bottoms in low sediment and high hydrogenation operations. Although an E-bed is used to maximize the conversion of vacuum residuum (VR), it is often limited by fouling caused by sediment in the product. In order to reduce sedimentation in the product, Albemarle developed an improved E-bed catalytic technology by characterizing the asphaltenes and sediments in order to better understand the oil chemistry and compatibility. The most recent development involves the patented catalyst-staging technology and the improved single catalyst application. Both achieve very low sediment or higher hydrodesulphurization (HDS) and Conradson carbon (CCR) removal for improved bottom upgrading. tabs., figs.

  15. Platinum 'opal eyes' - an upgraded high resolution imaging standard for performance monitoring of FEG SEM and FEG VPSEM

    International Nuclear Information System (INIS)

    Griffin, B.J.

    2003-01-01

    Full text: The new generation of field emission variable pressure and conventional scanning electron microscopes [FEG (VP)SEM] are capable of extremely high resolution (e.g. 1nm 15kV) and, in parallel, imaging at very low accelerating voltages (e.g. 4 nm 0.1 kV). Most of this level of performance is in conventional high vacuum modes of operation, the variable pressure performances are lower but under rapid development. A synthetic opal sample with fine gold decoration on the 400nm silica spheres was described previously as a suitable standard for the routine monitoring of SEM performance. The sample was named 'OPAL EYES'. Whilst ideal for tungsten and LaBo filament sourced SEMs the level of detail was marginal for field emission SEM performance measurement for two reasons. Firstly, the fine gold decoration was highly variable in grain size and inconsistent between samples making comparable image collection difficult. Secondly the sample was prone to self-contamination and damage during imaging at high accelerating voltages or high magnifications. Overall the 'OPAL EYES' sample has been successful in its adoption by a number of service engineers and laboratories world-wide. A new processing step has been added to the previously described preparation process for the OPAL-EYES standard; a light sputter coating with platinum. The effect is dramatic and results in growth of (presumably -to be checked and reported on) Au-Pt features of remarkably consistent size within the central EYE regions of the sample. These outgrowths are proud of the substrate and often equi-dimensional at a size of ∼ 10 nm. The substrate detail is at a scale of ∼2-3 nm. The new Pt OPAL EYES have been used as a resolution test specimen on a recently installed FEG VPSEM with excellent results. An important feature of this new sample is the high contrast sharp-edged nature of the detail as this not only allows resolution measurement but also definition of interference (vibration, electric fields

  16. Pixel Detector Developments for Tracker Upgrades of the High Luminosity LHC

    CERN Document Server

    Meschini, Marco; Dalla Betta, G. F; Dinardo, Mauro; Giacomini, G; Menasce, Dario; Mendicino, R; Messineo, Alberto; Moroni, Luigi; Ronchin, S; Sultan, D.M.S; Uplegger, Lorenzo; Viliani, Lorenzo; Zoi, Irene; Zuolo, Davide

    2017-01-01

    and 3D devices. The results on the 3D pixel sensors before irradiation are very satisfactory and % make us confident support the conclusion that columnar devices are % 3D devices very good candidates for the inner layers of the upgrade pixel detectors.

  17. INPP safety upgrade programme. Accomplishments and progress

    International Nuclear Information System (INIS)

    Vaisnys, P.

    1996-01-01

    The safety upgrade programme consists of the following parts: Post Chernobyl immediate modifications undertaken to remove obvious deficiencies discovered in the course of analysis of the main causes of Chernobyl accident; Modifications to remove gaps in safety provision discovered as a result of safety assessment investigations; Modifications to remove evident discrepancies in respect to internationally accepted standard. As it follows from above the deep safety investigations were undertaken to put their findings into concrete improvement programme

  18. Plans for the upgrade of the LHC injectors

    CERN Document Server

    Garoby, R; Goddard, B; Hanke, K; Meddahi, M; Vretenar, M

    2011-01-01

    The LHC injectors upgrade (LIU) project has been launched at the end of 2010 to prepare the CERN accelerator complex for reliably providing beam with the challenging characteristics required by the high luminosity LHC until at least 2030. Based on the work already started on Linac4, PS Booster, PS and SPS, the LIU project coordinates studies and implementation, and interfaces with the high luminosity LHC (HL-LHC) project which looks after the upgrade of the LHC itself, expected by the end of the present decade. The anticipated beam characteristics are described, as well as the status of the studies and the solutions envisaged for improving the injector performances.

  19. The Hybrid Integrated Circuit of the ALICE Inner Tracking System upgrade

    CERN Document Server

    Fiorenza, G; Pastore, C; Valentino, V

    2016-01-01

    The upgrade of the Inner Tracking System scheduled during the second long shutdown is an important milestone of the ALICE upgrade and it will provide a high improvement of its performances. In this contribution the smallest operator unit of the detector, the Hybrid Integrated Circuits, is presented.

  20. Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Herrmann, A; Greuner, H; Fuchs, J C; Marne, P de; Neu, R

    2009-01-01

    ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N 2 -seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.

  1. Upgrading the ATLAS Tile Calorimeter electronics

    CERN Document Server

    Souza, J; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. Its main upgrade will occur for the High Luminosity LHC phase (phase 2) where the peak luminosity will increase 5-fold compared to the design luminosity (10exp34 cm−2s−1) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity leveling. This upgrade will probably happen around 2023. The upgrade aims at replacing the majority of the on- and off-detector electronics so that all calorimeter signals are directly digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. The smallest independent on-detector electronics module has been reduced from 45 channels to 6, greatly reducing the consequences of a failure in the on-detector electronics. The size of t...

  2. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Reed, Robert; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the main hadronic calorimeter covering the central region of the ATLAS experiment at LHC. TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC operation (Phase 2 around 2023) where the peak luminosity will increase 5x compared to the design luminosity (10^{34} cm^{-2}s^{-1}) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims to replace the majority of the on- and off-detector electronics so that all calorimeter signals can be digitized and directly sent to the off-detector electronics in the counting room. This will reduce pile-up problems and allow more complex trigger algorithms. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to t...

  3. Upgrade of the ATLAS Tile Calorimeter

    CERN Document Server

    Moreno, P; The ATLAS collaboration

    2016-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase 2) where the peak luminosity will increase 5$\\times$ compared to the design luminosity ($10^{34} cm^{-2}s^{-1}$) but with maintained energy (i.e. 7+7 TeV). The TileCal upgrade aims at replacing the majority of the on- and off-detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, c...

  4. Characterisation of the Photon Detection System for the LHCb RICH Detector Upgrade

    CERN Document Server

    AUTHOR|(CDS)2097582; D'Ambrosio, Carmelo; Easo, Sajan

    The LHCb Experiment will be upgraded during Long Shutdown II of the Large Hadron Collider (LHC) in 2019 and 2020. The goal of the upgrade is to efficiently use the increased instantaneous luminosity in LHC Run 3 and to collect data at the proton collision rate of 40 MHz. The Ring Imaging Cherenkov (RICH) particle identification detectors will be upgraded to perform in the new operating conditions with continuing reliability. The photon detection system will be replaced using multi-anode photomultiplier tubes (MaPMTs) and associated read-out electronics. The photon detection chain was studied at CERN using a pulsed laser to test the system under high event rates and high photon intensities. The behaviour of two types of MaPMTs which are foreseen for the upgrade is presented for varying rates and intensities, and different applied bias voltages. A simulation was created to model the photon detection chain using the Geant4 simulation toolkit. The RICH Upgrade test beam using 180 GeV positive hadrons from CERN SP...

  5. Pakistan upgrades PARR-1 and converts to LEU

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    The Pakistan Research Reactor, PARR-1, is a 5MW swimming pool type reactor originally designed to use MTR type fuel elements fabricated from uranium enriched to more than 90%. After about 24 years of satisfactory operation it is now planned to convert the reactor to use low enriched (20%) uranium fuel. The opportunity will also be taken to upgrade the reactor power to about 9MW. This power upgrading will meet the demand for higher neutron fluxes for experimental and radioisotope production as well as compensating for the neutron flux penalty arising from conversion from high enriched to low enriched fuel. During the process of conversion and upgrading it is also proposed to renovate existing services and associated systems and to add certain new safety related engineering. (author)

  6. Estimation of Airline Benefits from Avionics Upgrade under Preferential Merge Re-sequence Scheduling

    Science.gov (United States)

    Kotegawa, Tatsuya; Cayabyab, Charlene Anne; Almog, Noam

    2013-01-01

    Modernization of the airline fleet avionics is essential to fully enable future technologies and procedures for increasing national airspace system capacity. However in the current national airspace system, system-wide benefits gained by avionics upgrade are not fully directed to aircraft/airlines that upgrade, resulting in slow fleet modernization rate. Preferential merge re-sequence scheduling is a best-equipped-best-served concept designed to incentivize avionics upgrade among airlines by allowing aircraft with new avionics (high-equipped) to be re-sequenced ahead of aircraft without the upgrades (low-equipped) at enroute merge waypoints. The goal of this study is to investigate the potential benefits gained or lost by airlines under a high or low-equipped fleet scenario if preferential merge resequence scheduling is implemented.

  7. arXiv Status of the R&D activities for the upgrade of the ALICE TPC

    CERN Document Server

    Deisting, Alexander

    2018-01-01

    In order to cope with the high interaction rates provided by the LHC after the long shut-down 2, the ALICE TPC needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and $\\textrm{d}E/\\textrm{d}x$ resolution compared to the performance of the present TPC. Since readout by MWPCs is no longer feasible with these requirements, new technologies have to be employed. In the new readout the electron amplification is provided by a stack of four GEM foils. Here foils with a standard hole pitch of 140um as well as large pitch foils (280um) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of $\\sigma_{{E}}/{E}\\leq12\\%$ at the photopeak of $^{55}\\textrm{Fe}$. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventuall...

  8. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  9. Transport analysis of high radiation and high density plasmas in the ASDEX Upgrade tokamak

    Directory of Open Access Journals (Sweden)

    Casali L.

    2014-01-01

    Full Text Available Future fusion reactors, foreseen in the “European road map” such as DEMO, will operate under more demanding conditions compared to present devices. They will require high divertor and core radiation by impurity seeding to reduce heat loads on divertor target plates. In addition, DEMO will have to work at high core densities to reach adequate fusion performance. The performance of fusion reactors depends on three essential parameters: temperature, density and energy confinement time. The latter characterizes the loss rate due to both radiation and transport processes. The DEMO foreseen scenarios described above were not investigated so far, but are now addressed at the ASDEX Upgrade tokamak. In this work we present the transport analysis of such scenarios. Plasma with high radiation by impurity seeding: transport analysis taking into account the radiation distribution shows no change in transport during impurity seeding. The observed confinement improvement is an effect of higher pedestal temperatures which extend to the core via stiffness. A non coronal radiation model was developed and compared to the bolometric measurements in order to provide a reliable radiation profile for transport calculations. High density plasmas with pellets: the analysis of kinetic profiles reveals a transient phase at the start of the pellet fuelling due to a slower density build up compared to the temperature decrease. The low particle diffusion can explain the confinement behaviour.

  10. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  11. Proposed upgrade of the lower tier water moderators for the LANSE 1L MARK-III upgrade

    International Nuclear Information System (INIS)

    Muhrer, G.; Pitcher, E.J.; Russell, G.J.

    2005-01-01

    We will show in this article the proposed upgrade for the lower tier water moderators for the LANSCE 1L Mark-III design. This proposal will include the introduction of pre-moderators for the high intensity moderators and a change of the decoupler from Cadmium to Gadolinium on all lower tier water moderators. We will present the influence of these changes on the integrated thermal flux and the time distribution of these moderators. As part of the upgrade of the Manual Lujan Jr. Neutron Scattering Center target (1L target) the goal was to increase the integrated thermal flux of the lower high intensity and the high resolution moderator by 20%. We will show in this paper that this goal can be achieved by introducing a pre-moderator concept on the high resolution moderators and by changing the decoupling scheme on all three moderators. Furthermore we will show that this goal can be achieved without jeopardizing the time of flight resolution of these moderators. For the all these calculations we used the radiation transport code MCNPX, which is most commonly used for this type of calculations.

  12. Upgrade of the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Carrio, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (P hase - II ) where the pea k luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expe cted to happen around 202 4 . The TileCal upgrade aims at replacing the majority of the on - and off - detector electronics to the extent that all calorimeter signals will be digitized and sent to the off - detector electronics in the counting room. To achieve th e required reliability, redundancy has been introduced at different levels. Three different options are presently being investiga...

  13. Upgrades of the CMS Outer Tracker for HL-LHC

    CERN Document Server

    AUTHOR|(CDS)2067159

    2016-01-01

    The LHC machine is planning an upgrade program which will smoothly bring the luminosity to about 5×1034cm$^{−2}$s$^{−1}$ around 2028, to possibly reach an integrated luminosity of 3000 fb$^{−1}$ in the following decade. This High Luminosity LHC scenario, HL-LHC, will require a preparation program of the LHC detectors known as Phase-2 upgrade. The current CMS Outer Tracker, already running close to its design limits, will not be able to survive HL-LHC radiation conditions and CMS will need a completely new device, in order to fully exploit the highly demanding operating conditions and the delivered luminosity. The new Tracker should have also L1 trigger capabilities. To achieve such goals, R&D; activities are ongoing to explore options and develop solutions that would allow including tracking information at Level-1. The design choices for the CMS Outer Tracker upgrades are discussed along with some highlights of the R&D; activities.

  14. Upgrade of the ATLAS detectors and trigger at the High Luminosity LHC: tracking and timing for pile-up suppression

    CERN Document Server

    Testa, Marianna; The ATLAS collaboration

    2018-01-01

    The High Luminosity-Large Hadron Collider  is expected to start data-taking in 2026 and to provide an integrated luminosity of 3000 fb-1, giving a factor 10 more data than will be collected by 2023. This high statistics will make it possible to perform precise measurements in the Higgs sector and improve searches of new physics at the TeV scale. The luminosity is expected to be 7.5 ×1034 cm-2 s-1, corresponding to about 200 proton-proton pile-up interactions, which will increase the rates at each level of the trigger and degrade the reconstruction performance. To cope with such a harsh environment some sub-detectors of the ATLAS experiment will be upgraded or completely substituted and the Trigger-DAQ system will be upgraded. In this talk an overview of two new sub-detectors enabling powerful pile-up suppression, a new Inner Tracker and a proposed High Granularity Timing Detector, will be given, describing the two technologies, their performance, and their interplay. Emphasis will also be given to the possi...

  15. Upgrade of the ATLAS detectors and trigger at the High Luminosity LHC: tracking and timing for pile-up suppression

    CERN Document Server

    Testa, Marianna; The ATLAS collaboration

    2018-01-01

    The High Luminosity-Large Hadron Collider is expected to start data-taking in 2026 and to provide an integrated luminosity of 3000 fb^{-1}, giving a factor 10 more data than will be collected by 2023. This high statistics will make it possible to perform precise measurements in the Higgs sector and improve searches of new physics at the TeV scale. The luminosity is expected to be 7.5 \\times 10^{34} cm^{-2} s^{-1}, corresponding to about 200 proton-proton pile-up interactions, which will increase the rates at each level of the trigger and degrade the reconstruction performance. To cope with such a harsh environment some sub-detectors of the ATLAS experiment will be upgraded or completely substituted and the Trigger-DAQ system will be upgraded. In this talk an overview of two new sub-detectors enabling powerful pile-up suppression, a new Inner Tracker and a proposed High Granularity Timing Detector, will be given, describing the two technologies, their performance, and their interplay. Emphasis will also be giv...

  16. Large-R jets in Atlas Tile Calorimeter current and upgraded geometry

    CERN Document Server

    Cecchini, Vincent Egidio

    2017-01-01

    This report describes a comparative study of two different geometries of the Atlas Tile Calorimeter to assess the performance of an increased granularity upgrade. The current geometry is compared to the upgraded one, needed because of the luminosity increase in the High-Luminosity LHC. Those geometries had been simulated in Geant4 to provide Monte-Carlo events simulations allowing us to compare the behaviour of the upgraded geometry with the current one. Data analysis is made from this simulation to compare the behaviour of the reconstructed jets substructure in the two different geometries.

  17. Upgrade of long trace profiler for characterization of high-precision X-ray mirrors at SPring-8

    International Nuclear Information System (INIS)

    Senba, Y.; Kishimoto, H.; Ohashi, H.; Yumoto, H.; Zeschke, T.; Siewert, F.; Goto, S.; Ishikawa, T.

    2010-01-01

    The long trace profiler (LTP) at SPring-8 has been upgraded to improve stability and resolution of slope measurement. The performances of the upgraded LTP at SPring-8 are presented by cross-checking measurements on a flat mirror with data obtained using Nanometer Optical Component Measuring Machine (NOM) at the Helmholtz Zentrum Berlin/BESSY-II.

  18. Using Retrofit Nail Base Panels to Expand the Market for Wall Upgrades

    Energy Technology Data Exchange (ETDEWEB)

    Del Bianco, M. [Home Innovation Research Lab., Upper Marlboro, MD (United States); Wiehagen, J. [Home Innovation Research Lab., Upper Marlboro, MD (United States)

    2016-02-01

    This project evaluated the effectiveness and affordability of integrating retrofit insulated panels into a re-siding project. The Partnership for Home Innovation (PHI) teamed with New York State Energy Research and Development Authority (NYSERDA), the Albany Housing Authority (AHA), and the New York State Weatherization Assistance Program (WAP) administered by Albany Community Action Partnership to demonstrate an energy retrofit and siding upgrade on a two-story, seven unit, multifamily building in Albany New York (CZ 5). The project focused on accomplishing three goals - doubling the existing wall thermal resistance (from approximately R-13 to a weighted average of R-27), reduction of building air leakage, and completion of the retrofit within a budget where the additional cost for upgrading wall's thermal resistance is equal to the cost of the standard re-siding effort (i.e., the total cost of the energy efficient re-siding scope of work is not more than double the cost of the standard re-siding effort). Lessons learned from the project strongly indicate that the retrofit panel technology can be installed using common installation practices and with minimal training. Other lessons learned include limitation on the use of standard air sealing materials during cold weather installations and the need to develop better installation guidance for trades working with the level of tolerances that may be present in the existing structure. This technology demonstration showed that exterior retrofit panels provide a viable and reasonable option for the siding trades to increase market opportunities and achieve synergistic benefits for aesthetic upgrades to a building's exterior.

  19. Status of the CMS Phase I pixel detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Spannagel, S., E-mail: simon.spannagel@desy.de

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  20. Status of the CMS Phase I Pixel Detector Upgrade

    CERN Document Server

    Spannagel, Simon

    2016-09-21

    A new pixel detector for the CMS experiment is being built, owing to the instantaneous luminosities anticipated for the Phase~I Upgrade of the LHC. The new CMS pixel detector provides four-hit tracking while featuring a significantly reduced material budget as well as new cooling and powering schemes. A new front-end readout chip mitigates buffering and bandwidth limitations, and comprises a low-threshold comparator. These improvements allow the new pixel detector to sustain and improve the efficiency of the current pixel tracker at the increased requirements imposed by high luminosities and pile-up. This contribution gives an overview of the design of the upgraded pixel detector and the status of the upgrade project, and presents test beam performance measurements of the production read-out chip.

  1. Coal upgrading based on the high temperature reactor - engineering and economic aspects

    International Nuclear Information System (INIS)

    Barnert, H.; Neis, H.

    1987-01-01

    The development of the high temperature reactor in the FRG was opened with the aim of economically producing electricity which might be achieved with the next project works. Moreover, the HTR supplies process heat of very high temperature which may be used with metallic heat exchangers in the range up to 1000 0 C. From these reasons and regarding the world power prospects and the special power situation in our own country, the FRG began to develop methods of upgrading fossil primary energy sources using high-temperature heat from the HTR about 15 years ago. Meanwhile great progress has been achieved in research, development and test works; the modules are developed to a great extent. Economical service is expected for future utilization of selected processes. Problems to be still accomplished are first of all related to system testing as well as further exhaustion of the HTR's temperature potential. The proposed extension of the AVR to some process heat facility offers the possibility of testing the system in a low-cost and accelerated manner. (author)

  2. Seismic analysis, evaluation and upgrade design for a DOE exhaust stack building

    International Nuclear Information System (INIS)

    Malik, L.E.; Maryak, M.E.

    1991-01-01

    An exhaust stack building of a nuclear reactor facility with complex structural configuration has been analyzed and evaluated and retrofitted for seismic forces. The building was built in the 1950's and had not been designed to resist seismic forces. A rigorous analysis and evaluation program was implemented to minimize costly retrofits required to upgrade the building to resist high seismic forces. Seismic evaluations were performed for the building in its as-is configuration, and as modified for several upgrade schemes. Soil-structure-interaction, basemat flexibility and the influence of the nearby reactor building were considered in rigorous seismic analyses. These analyses and evaluations enabled limited upgrades to qualify the stack building for the seismic forces. Some of the major conclusions of this study are: (1) a phased approach of seismic analyses, utilizing simplified models to evaluate practicable upgrade schemes, and, then incorporating the most suitable scheme in a rigorous model to obtain design forces for upgrades, is an efficient and cost-effective approach for seismic qualification of nuclear facilities to higher seismic criteria; and, (2) finalizing the upgrade of a major nuclear facility is an iterative process, which continues throughout the construction of the upgrades

  3. Shortened outage duration and increased safety with head assembly upgrade packages

    International Nuclear Information System (INIS)

    Leanne, M.; Lisien, P.E.; Plute, K.; Duran, J.

    2007-01-01

    To significantly reduce outage critical path duration and personnel radiation exposure, and to increase personnel safety, Westinghouse Electric Co., LLC has designed and installed upgrades to the existing head assemblies of operating pressurized water reactors. These upgrades are known as Head Assembly Upgrade Packages (HAUPs) or Simplified Head Assemblies (SHAs). Custom configurations are created from a set of standard elements to optimize the design for each unique containment, head assembly configuration, and licensing basis. Two primary options are available for implementation: a full HAUP or targeted component and system upgrades. Plants may achieve much of the outage savings, dose reduction, and safety improvements even with a more limited hardware scope. A range of improvements can be offered from integral missile shields, to redesigned duct work, radiation shields, and cable layout and connection optimization. The hardware changes are customized to target the scope that adds the most value for a given plant. While combining upgrades with a reactor vessel head (RVH) replacement adds some flexibility, it is not necessary. Some plants have chosen to implement targeted upgrades prior to a replacement RVH outage and then complete the remainder of the full HAUP during the replacement RVH outage. Three-dimensional computer aided design tools are used in the conceptual and detailed design phases to identify and avoid interferences between existing and replacement plant components. State-of-the-art computational fluid dynamics models for control drive mechanism (CDM) cooling systems are used to demonstrate the ability to maintain or improve the original design performance while greatly simplifying the disassembly/re-assembly activities. Likewise, state-of-the-art finite element analysis methods allow optimization of structural components while meeting code limits for design basis accident conditions. (authors)

  4. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  5. Positron Beam Characteristics at NEPOMUC Upgrade

    Science.gov (United States)

    Hugenschmidt, C.; Ceeh, H.; Gigl, T.; Lippert, F.; Piochacz, C.; Reiner, M.; Schreckenbach, K.; Vohburger, S.; Weber, J.; Zimnik, S.

    2014-04-01

    In 2012, the new neutron induced positron source NEPOMUC upgrade was put into operation at FRMII. Major changes have been made to the source which consists of a neutron-γ-converter out of Cd and a Pt foil structure for electron positron pair production and positron moderation. The new design leads to an improvement of both intensity and brightness of the mono-energetic positron beam. In addition, the application of highly enriched 113Cd as neutron-γ-converter extends the lifetime of the positron source to 25 years. A new switching and remoderation device has been installed in order to allow toggling from the high-intensity primary beam to a brightness enhanced remoderated positron beam. At present, an intensity of more than 109 moderated positrons per second is achieved at NEPOMUC upgrade. The main characteristics are presented which comprise positron yield and beam profile of both the primary and the remoderated positron beam.

  6. Biorefining compounds and organocatalytic upgrading methods

    Science.gov (United States)

    Chen, Eugene Y.; Liu, Dajiang

    2016-10-18

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl)furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  7. Biorefining compounds and organocatalytic upgrading methods

    Energy Technology Data Exchange (ETDEWEB)

    Chen, Eugene Y.; Liu, Dajiang

    2017-11-28

    The invention provides new methods for the direct umpolung self-condensation of 5-hydroxymethylfurfural (HMF) by organocatalysis, thereby upgrading the readily available substrate into 5,5'-di(hydroxymethyl) furoin (DHMF). While many efficient catalyst systems have been developed for conversion of plant biomass resources into HMF, the invention now provides methods to convert such nonfood biomass directly into DHMF by a simple process as described herein. The invention also provides highly effective new methods for upgrading other biomass furaldehydes and related compound to liquid fuels. The methods include the organocatalytic self-condensation (umpolung) of biomass furaldehydes into (C.sub.8-C.sub.12)furoin intermediates, followed by hydrogenation, etherification or esterification into oxygenated biodiesel, or hydrodeoxygenation by metal-acid tandem catalysis into premium hydrocarbon fuels.

  8. A continuous read-out TPC for the ALICE upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Lippmann, C., E-mail: C.Lippmann@gsi.de

    2016-07-11

    The largest gaseous Time Projection Chamber (TPC) in the world, the ALICE TPC, will be upgraded based on Micro Pattern Gas Detector technology during the second long shutdown of the CERN Large Hadron Collider in 2018/19. The upgraded detector will operate continuously without the use of a triggered gating grid. It will thus be able to read all minimum bias Pb–Pb events that the LHC will deliver at the anticipated peak interaction rate of 50 kHz for the high luminosity heavy-ion era. New read-out electronics will send the continuous data stream to a new online farm at rates up to 1 TByte/s. A fractional ion feedback of below 1% is required to keep distortions due to space charge in the TPC drift volume at a tolerable level. The new read-out chambers will consist of quadruple stacks of Gas Electron Multipliers (GEM), combining GEM foils with a different hole pitch. Other key requirements such as energy resolution and operational stability have to be met as well. A careful optimisation of the performance in terms of all these parameters was achieved during an extensive R&D program. A working point well within the design specifications was identified with an ion backflow of 0.63%, a local energy resolution of 11.3% (sigma) and a discharge probability comparable to that of standard triple GEM detectors.

  9. To upgrade or not to upgrade

    DEFF Research Database (Denmark)

    Rasmussen, Torben Valdbjørn; Rose, Jørgen

    2017-01-01

    This paper identifies the key indicators that owners need to take into account in order to choose the most affordable extent of upgrading of a typical post-1945 building. The exterior look of the building is not to be changed. Indicators include measures, risk assessment related to the changes in...

  10. Improved reliability, maintainability and safety through elastomer upgrading

    International Nuclear Information System (INIS)

    Wensel, R.; Wittich, K.C.

    1995-01-01

    Equipment in nuclear plants has historically contained whatever elastomer each component supplier traditionally used for corresponding non-nuclear service. The resulting proliferation of elastomer compounds, many of which are far from optimal for the service conditions (e.g., pressure, temperature, radiation, etc.), has multiplied the costs to provide station reliability, maintainability and safety. Cost-effective improvements are being achieved in CANDU plants by upgrading and standardizing on a handful of high performing elastomer compounds. These upgraded materials offer significant gains in service life over the materials they replace (often by factors of 2 or more). This rationalization of elastomer compounds also facilitates the EQ process for safety-related equipment. Detailed test data on aging is currently being generated for these specific elastomers, encompassing the conditions and media (air, water, oil) common in CANDU service. Two key elements characterize this testing. First, each result is specific to the compound used in the test, and second, it is specific to the tested failure mode (e.g., compression set, extrusion, fracture, etc.). Having fewer, but more thoroughly tested compounds, avoids the penalty (associated with poorly characterized materials) of having to replace parts prematurely because of conservatism, while maintaining safe, reliable service. This paper provides an overview of this approach covering: the benefits of compound rationalization; and the how and why of establishing relevant failure criteria; appropriate quality assurance to maintain EQ; procurement, storage and handling guidelines; and monitoring and predicting in-service degradation. (author)

  11. Instrumentation and control doctrine for VVER upgrading

    International Nuclear Information System (INIS)

    Pernette, R.; Cucciniello, J.; Trebot, R.

    1997-01-01

    The main results are reported of analyses carried out on the WWER-400 and WWER-1000 series, and the reasons are summed up underlying the decision to establish a policy of WWER instrumentation and control upgrading. It is shown that such a policy forms a key stage in any upgrading project and contributes to the improvement of reactor safety at several levels: it helps to optimize the integration of safety requirements; it makes it easier to achieve a high level of automation and a better man-machine interaction; it should raise the culture of reactor safety. Four annexes demonstrate the factual fundamentals and structure of such a policy. (A.K.)

  12. Upgrading uncompetitive products economically

    DEFF Research Database (Denmark)

    Lu, Hua; Jensen, Christian Søndergaard

    2012-01-01

    for upgrading an uncompetitive product, and combine the solutions into a single solution. We also propose a spatial join-based solution that assumes P and T are indexed by an R-tree. Given a set of products in the same R-tree node, we derive three lower bounds on their upgrading costs. These bounds are employed...

  13. Control processes and machine protection on ASDEX Upgrade

    International Nuclear Information System (INIS)

    Raupp, G.; Treutterer, W.; Mertens, V.; Neu, G.; Sips, A.; Zasche, D.; Zehetbauer, Th.

    2007-01-01

    Safe operation of ASDEX Upgrade is guaranteed by a conventional hierarchy of simple and robust hard-wired systems for personnel and machine protection featuring standardized switch-off procedures. Machine protection and handling of off-normal events is further enhanced and peak and lifetime stress minimized through the plasma control system. Based on a real-time process model supporting safety critical applications with data quality tagging, process self-monitoring, watchdog monitoring and alarm propagation, processes detect complex and critical failures and reliably perform case-sensitive counter measures. Intelligent real-time failure handling is done with hardware or software redundancy and performance degradation, or modification of reference values to continue or terminate discharges with reduced machine stress. Examples implemented so far on ASDEX Upgrade are given, such as recovery from measurement failures, switch-over of redundant actuators, handling of actuator limitations, detection of plasma instabilities, plasma state dependent soft landing, or handling of failed switch-off procedures through breakers disconnecting the machine from grid

  14. Upgrade of the Department of Energy's Savannah River Site's reactor operations and maintenance procedures

    International Nuclear Information System (INIS)

    Walsh, T.E.

    1991-01-01

    This paper describes the program in progress at the Savannah River Site (SRS) to upgrade the existing reactor operating and maintenance procedures to current commercial nuclear industry standards. In order to meet this goal, the following elements were established: administrative procedures to govern the upgrade process, tracking system to provide status and accountability; and procedure writing guides. The goal is to establish a benchmark of excellence by which other Department of Energy (DOE) sites will measure themselves. The above three elements are addressed in detail in this paper

  15. The ALICE TPC Upgrad

    Science.gov (United States)

    Castro, Andrew; Alice-Usa Collaboration; Alice-Tpc Collaboration

    2017-09-01

    The Time Projection Chamber (TPC) currently used for ALICE (A Large Ion Collider Experiment at CERN) is a gaseous tracking detector used to study both proton-proton and heavy-ion collisions at the Large Hadron Collider (LHC) In order to accommodate the higher luminosit collisions planned for the LHC Run-3 starting in 2021, the ALICE-TPC will undergo a major upgrade during the next LHC shut down. The TPC is limited to a read out of 1000 Hz in minimum bias events due to the intrinsic dead time associated with back ion flow in the multi wire proportional chambers (MWPC) in the TPC. The TPC upgrade will handle the increase in event readout to 50 kHz for heavy ion minimum bias triggered events expected with the Run-3 luminosity by switching the MWPCs to a stack of four Gaseous Electron Multiplier (GEM) foils. The GEM layers will combine different hole pitches to reduce the dead time while maintaining the current spatial and energy resolution of the existing TPC. Undertaking the upgrade of the TPC represents a massive endeavor in terms of design, production, construction, quality assurance, and installation, thus the upgrade is coordinated over a number of institutes worldwide. The talk will go over the physics motivation for the upgrade, the ALICE-USA contribution to the construction of Inner Read Out Chambers IROCs, and QA from the first chambers built in the U.S

  16. Upgrading a high-throughput spectrometer for high-frequency (<400 kHz) measurements

    Science.gov (United States)

    Nishizawa, T.; Nornberg, M. D.; Den Hartog, D. J.; Craig, D.

    2016-11-01

    The upgraded spectrometer used for charge exchange recombination spectroscopy on the Madison Symmetric Torus resolves emission fluctuations up to 400 kHz. The transimpedance amplifier's cutoff frequency was increased based upon simulations comparing the change in the measured photon counts for time-dynamic signals. We modeled each signal-processing stage of the diagnostic and scanned the filtering frequency to quantify the uncertainty in the photon counting rate. This modeling showed that uncertainties can be calculated based on assuming each amplification stage is a Poisson process and by calibrating the photon counting rate with a DC light source to address additional variation.

  17. Upgrading a high-throughput spectrometer for high-frequency (<400 kHz) measurements

    International Nuclear Information System (INIS)

    Nishizawa, T.; Nornberg, M. D.; Den Hartog, D. J.; Craig, D.

    2016-01-01

    The upgraded spectrometer used for charge exchange recombination spectroscopy on the Madison Symmetric Torus resolves emission fluctuations up to 400 kHz. The transimpedance amplifier’s cutoff frequency was increased based upon simulations comparing the change in the measured photon counts for time-dynamic signals. We modeled each signal-processing stage of the diagnostic and scanned the filtering frequency to quantify the uncertainty in the photon counting rate. This modeling showed that uncertainties can be calculated based on assuming each amplification stage is a Poisson process and by calibrating the photon counting rate with a DC light source to address additional variation.

  18. Upgrading a high-throughput spectrometer for high-frequency (<400 kHz) measurements

    Energy Technology Data Exchange (ETDEWEB)

    Nishizawa, T., E-mail: nishizawa@wisc.edu; Nornberg, M. D.; Den Hartog, D. J. [University of Wisconsin–Madison, Madison, Wisconsin 53706 (United States); Craig, D. [Wheaton College, Wheaton, Illinois 60187 (United States)

    2016-11-15

    The upgraded spectrometer used for charge exchange recombination spectroscopy on the Madison Symmetric Torus resolves emission fluctuations up to 400 kHz. The transimpedance amplifier’s cutoff frequency was increased based upon simulations comparing the change in the measured photon counts for time-dynamic signals. We modeled each signal-processing stage of the diagnostic and scanned the filtering frequency to quantify the uncertainty in the photon counting rate. This modeling showed that uncertainties can be calculated based on assuming each amplification stage is a Poisson process and by calibrating the photon counting rate with a DC light source to address additional variation.

  19. Chip development in 65 nm CMOS technology for the high luminosity upgrade of the ATLAS pixel detector

    Energy Technology Data Exchange (ETDEWEB)

    Germic, Leonard; Hemperek, Tomasz; Kishishita, Tetsuichi; Krueger, Hans; Rymaszewski, Piotr; Wermes, Norbert [University of Bonn, Bonn (Germany)

    2016-07-01

    The LHC High Luminosity upgrade will result in a significant change of environment in which particle detectors are going to operate, especially for devices very close to the interaction point like pixel detector electronics. Challenges arising from the increased hit rate will have to be solved by designing faster and more complex readout electronics that will also have to withstand unprecedented radiation doses. Developing such integrated circuit requires a significant R and D effort and resources, therefore a joint development project between several institutes (including ours) was started. This collaboration, named RD53, aims to develop a pixel readout chip suitable for ATLAS' and CMS' upgrades using a 65nm CMOS technology. During this presentation motivations and benefits of using this very deep-submicron technology are discussed. Most of the talk is allocated to presenting some of the circuits designed by our group (focusing on developments connected to RD53 collaboration), along with their performance measurement results.

  20. Performance Studies of Resistive Micromegas Detectors for the Upgrade of the ATLAS Muon Spectrometer

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00387450

    2017-01-01

    With the high luminosity upgrade of the LHC the ATLAS Muon spectrometer will face increased particle rates, requiring an upgrade of the innermost end-cap detectors with a high-rate capable technology. Micromegas have been chosen as main tracking technology for this New Small Wheel upgrade. In an intense R$\\&$D and prototype phase the technology has proven to meet the stringent performance requirements of highly efficient particle detection with better than 100$\\rm{\\mu m}$ spatial resolution, independent of the track incidence angle up to 32$^\\circ$, in a magnetic field B $\\leq$ 0.3 T and at background hit rate of up to 15kHz/cm$^2$.

  1. Prototype application for the control and debugging of CMS upgrade projects

    CERN Document Server

    Mills-Howell, Dominic

    2016-01-01

    Following the high-luminosity upgrades of the LHC, many subsystems of the CMS experiment require upgrading and others are using the LHC shutdowns as an opportunity to improve performance. The upgrades, themselves, have served to highlight the exigency to attack problems that were previously unaddressed. One such problem is the need for a tool that allows the users to easily monitor, debug, and test custom hardware. Such a tool could be abstracted to work, in theory, with various hardware devices. In addition to having the added benefit of being able to support future hardware, and maintaining parallel operations with the remaining control software.

  2. Environmental impact assessment of oilfield upgrades in Bohai Sea

    Science.gov (United States)

    Chen, Ruihui; Xiong, Yanna; Li, Jiao; Li, Xianbo

    2018-02-01

    This paper designed 65 environmental monitoring sites to collect samples and analyze for better evaluating the environmental impact generated by cuttings, mud, produced water with oil and oil pollutions that produced during the upgrading in the Bohai Sea where the oil field 34-1 upgraded. Collecting samples include ocean water, marine life and sediments and test items involve PH, dissolved oxygen (DO), salinity, chemical oxygen demand (COD), phosphate, organic carbon, sulfide, inorganic nitrogen, petroleum, copper (Cu), lead (Pb), zinc (Zn), cadmium (Cd), total chromium (Cr), total mercury (Hg) and arsenic (As). Meanwhile sample sites collect and analyze the abundance and diversity of marine plants and elaborated the environmental impact caused by upgrading renovation project from the aspects of sea water, marine life and marine sediments. Through analysis and comparison we found that seawater quality conform the Ш seawater quality standards, the excessive rate of Cu is 10%, the average diversity index of marine life is 2.34 and evenness is 0.68. Influence range of marine sediments and pollutants of production is within 2.68km and basically has no serious impact in the surrounding sea area. It’s worth nothing that reconstruction project has the risk of oil spilling and protective measures must be prepared.

  3. The Advanced Light Source Upgrade

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benjamin; Hussain, Zahid; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2003-01-01

    The ALS, a third-generation synchrotron light source at Berkeley Lab, has been operating for almost a decade and is generating forefront science by exploiting the high brightness of a third-generation source in three areas: (1) high resolving power for spectroscopy; (2) high spatial resolution for microscopy and spectromicroscopy; and (3) high coherence for experiments such as speckle. However, the ALS was one of the first third-generation machines to be designed, and accelerator and insertion-device technology have significantly changed since its conception. As a result, its performance will inevitably be outstripped by newer, more advanced sources. To remain competitive and then set a new standard, the performance of the ALS, in particular its brightness, must be enhanced. Substantial improvements in brightness and current have always been feasible in principle, but they incur the penalty of a much reduced lifetime, which is totally unacceptable to our users. Significant brightness improvements can be realized in the core soft x-ray region by going to top-off operation, where injection would be quasi-continuous and the lifetime objections disappear. In top-off mode with higher average current, a reduced vertical emittance and beta function, and small-gap permanent-magnet or superconducting insertion devices, one to two orders of magnitude improvement in brightness can be had in the soft x-ray range. These improvements also extend the high energy range of the undulator radiation beyond the current limit of 2000 eV. Descriptions of the upgrade and the important new science achievable are presented

  4. e/sup +/e/sup -/ interactions at very high energy: searching beyond the standard model

    Energy Technology Data Exchange (ETDEWEB)

    Dorfan, J.

    1983-04-01

    These lectures discuss e/sup +/e/sup -/ interactions at very high energies with a particular emphasis on searching the standard model which we take to be SU(3)/sub color/..lambda.. SU(2) ..lambda.. U(1). The highest e/sup +/e/sup -/ collision energy exploited to date is at PETRA where data have been taken at 38 GeV. We will consider energies above this to be the very high energy frontier. The lectures will begin with a review of the collision energies which will be available in the upgraded machines of today and the machines planned for tomorrow. Without going into great detail, we will define the essential elements of the standard model. We will remind ourselves that some of these essential elements have not yet been verified and that part of the task of searching beyond the standard model will involve experiments aimed at this verification. For if we find the standard model lacking, then clearly we are forced to find an alternative. So we will investigate how the higher energy e/sup +/e/sup -/ collisions can be used to search for the top quark, the neutral Higgs scalar, provide true verification of the non-Abelian nature of QCD, etc. Having done this we will look at tests of models involving simple extensions of the standard model. Models considered are those without a top quark, those with charged Higgs scalars, with multiple and/or composite vector bosons, with additional generations and possible alternative explanations for the PETRA three jet events which don't require gluon bremsstrahlung. From the simple extensions of the standard model we will move to more radical alternatives, alternatives which have arisen from the unhappiness with the gauge hierarchy problem of the standard model. Technicolor, Supersymmetry and composite models will be discussed. In the final section we will summarize what the future holds in terms of the search beyond the standard model.

  5. ATLAS Detector Upgrade Prospects

    CERN Document Server

    Dobre, Monica; The ATLAS collaboration

    2016-01-01

    After the successful operation at the center-of-mass energies of 7 and 8 TeV in 2010 - 2012, the LHC is ramped up and successfully took data at the center-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity leveling. The ultimate goal is to extend the dataset from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extens...

  6. ATLAS detector upgrade prospects

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00184940; The ATLAS collaboration

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC is ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, delivering of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb$^{-1}$ expected for LHC running to 3000 fb $^{-1}$ by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of ...

  7. Deployment and future prospects of high performance diagnostics featuring serial I/O (SIO) data acquisition (DAQ) at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Behler, K., E-mail: karl.behler@ipp.mpg.de [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, D-85748 Garching bei Muenchen (Germany); Blank, H.; Eixenberger, H. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, D-85748 Garching bei Muenchen (Germany); Fitzek, M. [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, D-82393 Iffeldorf (Germany); Lohs, A. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, D-85748 Garching bei Muenchen (Germany); Lueddecke, K. [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, D-82393 Iffeldorf (Germany); Merkel, R. [Max-Planck-Institut fuer Plasmaphysik, Boltzmannstr. 2, D-85748 Garching bei Muenchen (Germany)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer The high sustained data rates transferring measured data from periphery into memory of computers. Black-Right-Pointing-Pointer The achieved low latency in real-time interrupt handling under Solaris 10. Black-Right-Pointing-Pointer The new prototype of an even more powerful 2nd generation SIO II device. Black-Right-Pointing-Pointer The fusion of all blocks of board logic (serializer, FIFO, TDC, merge engine, PCIe controller) into one single FPGA simplifying the boards physical layout significantly. - Abstract: The SIO DAQ concept used at the ASDEX Upgrade fusion experiment features data acquisition from a modular front-end (a modular crate-and-interface-cards concept for analog and digital input and output) over standardized serial lines and via a serial input/output computer interface card (the SIO card) in real-time directly into the main memory of a host computer. Deployment of a series of diagnostics using SIO led to various solutions and configurations for the different requirements. Experience has been gained and lessons learned applying the SIO concept at its technical limits. Requirements for a further development of the SIO concept have been identified, and a performance improvement by a factor of 4-8 beyond its current limits seems achievable. An effort has been started to develop a SIO version 2 (SIO II) featuring upgraded serial links and a more powerful FPGA for merging and forwarding data streams to host computer memory. (Compatibility with the existing SIO (SIO I) front-end system has to be maintained.) This paper presents results achieved and experiences gained in the deployment of SIO I, the status of SIO II development (currently in the prototype phase), and projected enhancements and updates to existing implementations.

  8. ATLAS Muon DCS Upgrades and Optimizations

    CERN Document Server

    Bakalis, Christos; The ATLAS collaboration

    2017-01-01

    The Muon subsystem is comprised of four detector types: Resistive Plate Chambers (RPC) and Thin Gap Chambers (TGC) for trigger purposes, and Cathode Strip Chambers (CSC) and Muon Drift Tubes (MDT) for muon track reconstruction. The MDTs cover a large area at the outer part of the detector. In total, there are over a 1’000 MDT chambers, which are made of about 350’000 tubes. The luminosity upgrade of the HL-LHC is expected to pose a serious challenge to the MDTs. The expected increase of particle flux will set new, higher standards regarding the operation and control of the chambers. A step towards optimizing the ATLAS Muon Detector Control System (DCS) was to develop several DCS tools, namely a High Luminosity vs Trip Limit panel with its accompanying scripts and managers. The ultimate goal of this tool is to protect the MDT chambers from the rising particle flux and its associated increase in chamber current. In addition to optimizing the ATLAS Muon DCS, several tasks to accommodate the newly installed B...

  9. Biomass to fuels : Upgrading of flash pyrolysis oil by reactive distillation using a high boiling alcohol and acid catalysts

    NARCIS (Netherlands)

    Mahfud, F.H.; Melian Cabrera, I.V.; Manurung, R.M.; Heeres, H.J.

    We here report our studies on the upgrading of flash pyrolysis oil using an improved alcohol treatment method. The method consists of treating pyrolysis oil with a high boiling alcohol like n-butanol in the presence of a (solid) acid catalyst at 323-353 K under reduced pressure (<10 kPa). Using this

  10. Upgrading the Fermilab fire and security reporting system

    International Nuclear Information System (INIS)

    King, C.; Neswold, R.

    2012-01-01

    Fermilab's home grown fire and security system (known as FIRUS - Fire Incident Reporting and Utility System) is highly reliable and has been used for nearly thirty years. The system has gone through some minor upgrades, however, none of those changes made significant, visible changes. In this paper, we present a major overhaul to the system that is halfway complete. We discuss the use of Apple's OS X for the new GUI (Graphical User Interface), upgrading the servers to use the Erlang programming language and allowing limited access for iOS and Android-based mobile devices. (authors)

  11. Five TWh saved on profitable upgrading

    International Nuclear Information System (INIS)

    Bakken, Stein Arne.

    1999-01-01

    Article. In Norway, a project is planned to evaluate the upgrading potential of the hydroelectric power sector. The article criticizes the authorities for not supporting the upgrading of hydroelectric power plants in their eager to promote the development of wind power. An important contribution of the planned project will be a book from which the utilities may get advice on measures of upgrading. Generators and control systems account for 80% of the faults and interruptions in the power utilities. The turbine technology has made important progress in the 1990s. By pure upgrading measures alone, the turbine efficiencies may be increased enough for an additional 3 TWh to be taken out from the Norwegian hydroelectric power system. Today, the price of imported carbon-based Danish power determines whether the utilities find it profitable to rehabilitate the hydroelectric plants. The energy potential of upgrading is estimated to be 5 TWh. This energy can be generated with known technology and with no serious consequences for the environment

  12. Upgraded HFIR Fuel Element Welding System

    International Nuclear Information System (INIS)

    Sease, John D.

    2010-01-01

    The welding of aluminum-clad fuel plates into aluminum alloy 6061 side plate tubing is a unique design feature of the High Flux Isotope Reactor (HFIR) fuel assemblies as 101 full-penetration circumferential gas metal arc welds (GMAW) are required in the fabrication of each assembly. In a HFIR fuel assembly, 540 aluminum-clad fuel plates are assembled into two nested annular fuel elements 610 mm (24-inches) long. The welding process for the HFIR fuel elements was developed in the early 1960 s and about 450 HFIR fuel assemblies have been successfully welded using the GMAW process qualified in the 1960 s. In recent years because of the degradation of the electronic and mechanical components in the old HFIR welding system, reportable defects in plate attachment or adapter welds have been present in almost all completed fuel assemblies. In October 2008, a contract was awarded to AMET, Inc., of Rexburg, Idaho, to replace the old welding equipment with standard commercially available welding components to the maximum extent possible while maintaining the qualified HFIR welding process. The upgraded HFIR welding system represents a major improvement in the welding system used in welding HFIR fuel elements for the previous 40 years. In this upgrade, the new inner GMAW torch is a significant advancement over the original inner GMAW torch previously used. The innovative breakthrough in the new inner welding torch design is the way the direction of the cast in the 0.762 mm (0.030-inch) diameter aluminum weld wire is changed so that the weld wire emerging from the contact tip is straight in the plane perpendicular to the welding direction without creating any significant drag resistance in the feeding of the weld wire.

  13. The ALICE Central Trigger Processor (CTP) upgrade

    International Nuclear Information System (INIS)

    Krivda, M.; Alexandre, D.; Barnby, L.S.; Evans, D.; Jones, P.G.; Jusko, A.; Lietava, R.; Baillie, O. Villalobos; Pospíšil, J.

    2016-01-01

    The ALICE Central Trigger Processor (CTP) at the CERN LHC has been upgraded for LHC Run 2, to improve the Transition Radiation Detector (TRD) data-taking efficiency and to improve the physics performance of ALICE. There is a new additional CTP interaction record sent using a new second Detector Data Link (DDL), a 2 GB DDR3 memory and an extension of functionality for classes. The CTP switch has been incorporated directly onto the new LM0 board. A design proposal for an ALICE CTP upgrade for LHC Run 3 is also presented. Part of the development is a low latency high bandwidth interface whose purpose is to minimize an overall trigger latency

  14. Constitutional determinants of nuclear power plant upgrading

    International Nuclear Information System (INIS)

    Mann, Thomas

    2013-01-01

    Around half a year ago the European stress test for nuclear power plants, a precautionary measure initiated by the European Council in March 2011 in response to the Fukushima disaster, revealed that while German nuclear power plants show a high degree of robustness compared with those in other European countries, they nevertheless required upgrading in one or the other respect (earthquake warning systems, protection against crashing civil passenger airplanes). The present article investigates whether this upgrading requirement can justify an injunction to carry out structural retrofitting measures or whether obligations to this end can be excluded on grounds of reasonability in view of the recent decision taken by the German parliament to phase out nuclear energy.

  15. Upgrade trigger: Biannual performance update

    CERN Document Server

    Aaij, Roel; Couturier, Ben; Esen, Sevda; De Cian, Michel; De Vries, Jacco Andreas; Dziurda, Agnieszka; Fitzpatrick, Conor; Fontana, Marianna; Grillo, Lucia; Hasse, Christoph; Jones, Christopher Rob; Le Gac, Renaud; Matev, Rosen; Neufeld, Niko; Nikodem, Thomas; Polci, Francesco; Del Buono, Luigi; Quagliani, Renato; Schwemmer, Rainer; Seyfert, Paul; Stahl, Sascha; Szumlak, Tomasz; Vesterinen, Mika Anton; Wanczyk, Joanna; Williams, Mark Richard James; Yin, Hang; Zacharjasz, Emilia Anna

    2017-01-01

    This document presents the performance of the LHCb Upgrade trigger reconstruction sequence, incorporating changes to the underlying reconstruction algorithms and detector description since the Trigger and Online Upgrade TDR. An updated extrapolation is presented using the most recent example of an Event Filter Farm node.

  16. Performance evaluation of converted and upgraded PARR-1

    International Nuclear Information System (INIS)

    Pervez, Showket; Iqbal, Masood

    1998-01-01

    Pakistan Research Reactor-1 (PARR-1), a swimming pool MTR type research reactor which attained full power of 5 MW in June, 1996, with 93% high enriched uranium (HEU) fuel was converted to ,20% Low Enriched Uranium (LEU) fuel in october, 1991. The reactor power was also upgraded from 5 MW to 9 MW and then to 10 MW. Different critical and full power operational core configurations were assembled with the new fuel. The final equilibrium core was assembled with 27 standard fuel elements and five control fuel elements having a central flux trap facility for high neutron flux. detailed neutronics and thermal-hydraulic design calculations were made for the core conversion programme. After achieving the initial criticality several critical and power experiments were performed on the new core for the verification of design data and to determine the nuclear performance of the reactor. a comparison of the measured and the calculated results was also made. the results of the characteristics tests indicate that the performance of the new reactor is within the design limits. In flux trap thermal neutron flux is about 2x10 14 n.cm - 2. s - 1 which is five times higher than the average neutron flux of the core, seven standard and two control fuel elements have achieved designed burnup of 35%. Their physical inspection predicts excellent condition. (author)

  17. Processing options for bitumen upgrading

    International Nuclear Information System (INIS)

    Harji, A.N.; Koppel, P.E.; Mazurek, W.L.; Meysami, P.

    2003-01-01

    It is estimated that 178 billion barrels of oil can be recovered from Alberta's vast heavy oil reserves. The challenge lies in the logistics of recovering, upgrading and transporting the oil to market. The Canadian Energy Research Institute conducted a recent study to determine market potential by 2007 for diluted bitumen and synthetic crude oil produced from upgraded bitumen. The viability for a wide range of bitumen feedstocks was assessed along with the sensitivity of refinery demand to their prices. The 3 major markets for western Canadian bitumen include PADD 2 in the United States, western Canada, and Ontario. Bitumen is too viscous to transport by pipeline and cannot be processed by most of the existing refineries. Therefore, in order to develop a mass market for the product, bitumen must undergo the energy intensive upgrading process at existing refineries. The factors impacting which method of upgrading is most suitable were discussed with particular attention to the impact that Canada's ratification of the Kyoto Protocol may have on Alberta's bitumen resource in terms of costs of complying with greenhouse gas reduction initiatives. The authors emphasized that it is crucial to customize an upgrading project to meet site and market specific factors. 8 refs., 3 tabs., 3 figs

  18. New Physics perspectives with the upgraded LHCb detector

    International Nuclear Information System (INIS)

    Cavallero, G.

    2017-01-01

    First encouraging deviations from Standard Model have been observed by the LHCb Collaboration in the first phase of data taking. The LHCb upgrade will be crucial to conclude if New Physics exists up to ∼ O(100 TeV), thanks to the collection of a very large data sample of ∼ 50 fb"−"1 and to an innovative flexible software based trigger system. An overview of the main observables accessible to LHCb that could reveal New Physics effects is reported.

  19. Radiation Hard and High Light Yield Scintillator Search for CMS Phase II Upgrade

    CERN Document Server

    Tiras, Emrah

    2015-01-01

    The CMS detector at the LHC requires a major upgrade to cope with the higher instantaneous luminosity and the elevated radiation levels. The active media of the forward backing hadron calorimeters is projected to be radiation-hard, high light yield scintillation materials or similar alternatives. In this context, we have studied various radiation-hard scintillating materials such as Polyethylene Terephthalate (PET), Polyethylene Naphthalate (PEN), High Efficiency Mirror (HEM) and quartz plates with various coatings. The quartz plates are pure Cerenkov radiators and their radiation hardness has been confirmed. In order to increase the light output, we considered organic and inorganic coating materials such as p-Terphenyl (pTp), Anthracene and Gallium-doped Zinc Oxide (ZnO Ga) that are applied as thin layers on the surface of the quartz plates. Here, we present the results of the related test beam activities, laboratory measurements and recent developments.

  20. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  1. Physical design of JT-60 Super Upgrade

    International Nuclear Information System (INIS)

    Nagashima, K.; Kikuchi, M.; Kurita, G.; Ozeki, T.; Aoyagi, T.; Ushigusa, K.; Neyatani, Y.; Kubo, T.; Mori, K.; Nakagawa, S.; Kuriyama, M.; Nagami, M.

    1997-01-01

    The JT-60 Super Upgrade (JT-60SU) is an upgraded tokamak device of JT-60U for developing the steady-state reactor and advanced tokamak operation in the International Thermonuclear Experimental Reactor. The device is planned to utilize the JT-60 facilities fully and to minimize the needed modification. The major radius is 4.8 m and the maximum plasma current is 10 MA. Neutral beam injection with 750 keV beam energy is the primary heating method. The machine is capable of steady-state operation with high density up to 8.8 x 10 19 m -3 at 5 MA plasma current. The high operating density, over the Greenwald et al. limit, is critically important in order to achieve high bootstrap current fraction. Ballooning mode and low n ideal magnetohydrodynamic (MHD) mode including the bootstrap current were analyzed for steady-state operation. The current profile must be optimized to obtain a normalized beta up to 3. The plasma configuration with high triangularity was adopted in order to get good MHD stability and high energy confinement. A compact divertor was designed in order to get the large plasma space. (orig.)

  2. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  3. L1Track: A fast Level 1 track trigger for the ATLAS high luminosity upgrade

    International Nuclear Information System (INIS)

    Cerri, Alessandro

    2016-01-01

    With the planned high-luminosity upgrade of the LHC (HL-LHC), the ATLAS detector will see its collision rate increase by approximately a factor of 5 with respect to the current LHC operation. The earliest hardware-based ATLAS trigger stage (“Level 1”) will have to provide a higher rejection factor in a more difficult environment: a new improved Level 1 trigger architecture is under study, which includes the possibility of extracting with low latency and high accuracy tracking information in time for the decision taking process. In this context, the feasibility of potential approaches aimed at providing low-latency high-quality tracking at Level 1 is discussed. - Highlights: • HL-LH requires highly performing event selection. • ATLAS is studying the implementation of tracking at the very first trigger level. • Low latency and high-quality seem to be achievable with dedicated hardware and adequate detector readout architecture.

  4. Acceptance criteria for the physical protection upgrade rule requirements for fixed sites. Information guide

    International Nuclear Information System (INIS)

    Dwyer, P.

    1980-09-01

    This document has been developed as a tool to assist in providing consistent evaluation of upgraded physical security plans submitted in response to the Physical Protection Upgrade Rule, effective March 25, 1980. It presents a means for assuring licensee compliance with every regulatory requirement of particular significance to the protection of the public health and safety. Acceptance criteria are included to determine the extent to which each licensee meets the regulatory requirements. The format parallels Regulatory Guide 5.52, Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites

  5. Recent achievements of the ATLAS upgrade Planar Pixel Sensors R and D project

    International Nuclear Information System (INIS)

    Casse, G

    2014-01-01

    The ATLAS upgrade Planar Pixel Sensors (PPS) project aims to prove the suitability of silicon detectors processed with planar technology to equip all layers of the pixel vertex detector proposed for the upgrade of the ATLAS experiment for the future High Luminosity LHC at CERN (HL-LHC). The detectors need to be radiation tolerant to the extreme fluences expected to be received during the experimental lifetime, with optimised geometry for full coverage and high granularity and affordable in term of cost, due to the relatively large area of the upgraded ATLAS detector system. Here several solutions for the detector geometry and results with radiation hard technologies (n-in-n, n-in-p) are discussed

  6. CMS Phase II Upgrade Scope Document

    CERN Document Server

    Butler, J; Klute, M; Mans, J; Silvestris, L; on behalf of the CMS, Collaboration; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    The High-Luminosity LHC (HL-LHC) has been identified as the highest priority program in High Energy Physics by both the European Strategy Group and the US Particle Physics Project Prioritization Panel. To fulfil the full potential of this program, which includes the study of the nature of the Higgs boson, the investigation of the properties of any newly discovered particles in the upcoming LHC runs, and the extension of the mass reach for further discoveries, an integrated luminosity of 3000 fb-1 will have to be accumulated by the end of the program. In preparation for operation at the HL-LHC , CMS has documented the necessary upgrades and their expected costs in a Technical Proposal submitted to the CERN LHC Committee (LHCC) in mid-2015. The material presented in the current “Scope Document” provides additional information to assist the LHCC and the CERN Resource Review Board (RRB) in their review of the CMS upgrade. The document commences with a summary of the process followed to develop the scope of t...

  7. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  8. Studies on upgrading quality of zircon concentrate to meet the standard for frit by a combination of using a screen plate electrostatic separator and other beneficiation methods

    International Nuclear Information System (INIS)

    Nguyen Duc Hung

    2003-01-01

    In the present work, researches on qualitative upgrade of zircon concentrate in order to meet the standard for frit were carried out by combinations of a screen plate type electrostatic separator with other physical beneficiation methods such as magnetic separation, flotation, gravity by air-table along with chemical treatment on laboratory scale was itself manufactured for studied scopes, after that zircon concentrate about 63.9-64.8% of ZrO 2 , less than 0.13% of TiO 2 and 0.128% of Fe 2 O 3 values were recovered. (NDH)

  9. Impact of recent technical developments on upgrading economics

    International Nuclear Information System (INIS)

    Padamsey, R.

    1991-01-01

    A detailed study was conducted to compare the economics of hydrogen addition processes using Alberta heavy oil feedstocks, based on test achievements, with the economics of upgrading processes representative of those currently in commercial use in Alberta. Capital and operating cost estimates were developed for an upgrader complex centrally located in Alberta utilizing three alternative upgrading schemes: flexicoking with separate hydrotreating, low conversion flexicoking-fining with delayed coking of unconverted bottoms and separate hydrotreating, and VEBA combi-cracker high conversion (VCC) hydrogen addition with integrated hydrotreating. Each scheme was designed to process 60,000 bbl per calendar day of Cold Lake bitumen and produce a synthetic crude oil that could be substituted for a conventional crude. The study included capital cost estimates, operating cost estimates, economic analysis and sensitivity analysis. The results of these analyses, as measured by the price available for the bitumen, indicated that high conversion hydrogen addition processes with integrated hydrotreating, such as VCC, offer a significant economic advantage over the currently employed coking processes combined with separate hydrotreating and over the low conversion hydrogen addition processes combined with separate hydrotreating and coking of unconverted bottoms. Technology was found to have a significant impact on the economics of the operation. 4 refs., 6 figs., 7 tabs

  10. Upgrading Unconventional Oil Resources with the EST Process

    Energy Technology Data Exchange (ETDEWEB)

    Delbianco, Alberto; Meli, Salvatori; Panariti, Nicolleta; Rispoli, Giacomo

    2007-07-01

    We strongly believe that unconventional oils will play a much larger role in the growth of supply than is currently recognized. As a matter of fact, whereas the earth's conventional proven world oil reserves are 1.3 trillion barrels, extra-heavy plus bitumen resources amount to about 4 trillion barrels. The unconventional oils are characterized by low API gravity (<10), high viscosity and high concentration of poisons such as sulphur, nitrogen, metals, and asphaltenes. For this reason, a key role for the full exploitation of these hydrocarbon resources is played by the downstream processes that are required to upgrade and convert them into valuable products. In this scenario, Eni has developed a novel hydrocracking process (EST: Eni Slurry Technology) which is particularly well-suited for the conversion and upgrading of heavy feedstocks (conventional vacuum residues, extra-heavy oils and bitumen). EST employs nano-sized hydrogenation catalysts and an original process scheme that allow complete feedstock conversion to an upgraded synthetic crude oil (SCO) with an API gravity gain greater than 20 and avoid the production of residual by-products, such as pet-coke or heavy fuel oil. A Commercial Demonstration Unit (CDP) of 1200 bbl/d capacity is successfully operating in the Eni's Taranto refinery since November 2005. (auth)

  11. Upgrade of High-Energy X-Ray real-time radioscopy for KROTOS experiment

    Energy Technology Data Exchange (ETDEWEB)

    Estre, N.; Payan, E.; Cassiaut-Louis, N.; Compagnon, F.; Valerian, M.; Mallet, R. [CEA-Cadarache (France)

    2015-07-01

    As part of its R and D programs on severe accidents, in particular on understanding of corium-water interaction, CEA is commissioning an update of the KROTOS experiment at Cadarache. The Xray imaging setup (high energy real-time radioscopy) is upgraded to provide the best performances for the new experimental program. In order to fit the performance needs (faster acquisition, smaller detection limit and higher field of view), two radioscopy setups, with two linear accelerators (linacs 9 MV and 6 MV), are placed in the irradiation cell. Having discussed the expected performances in terms of frequency, detection limit and field-of-view, this article details each stage of both radioscopy chains: principles and technical characteristics. Then, linacs and cameras synchronization (at few hundred Hertz), data flows and storage setups are detailed. Finally, experimental characterizations and performance validations on phantom are presented. (authors)

  12. Upgrade of High-Energy X-Ray real-time radioscopy for KROTOS experiment

    International Nuclear Information System (INIS)

    Estre, N.; Payan, E.; Cassiaut-Louis, N.; Compagnon, F.; Valerian, M.; Mallet, R.

    2015-01-01

    As part of its R and D programs on severe accidents, in particular on understanding of corium-water interaction, CEA is commissioning an update of the KROTOS experiment at Cadarache. The Xray imaging setup (high energy real-time radioscopy) is upgraded to provide the best performances for the new experimental program. In order to fit the performance needs (faster acquisition, smaller detection limit and higher field of view), two radioscopy setups, with two linear accelerators (linacs 9 MV and 6 MV), are placed in the irradiation cell. Having discussed the expected performances in terms of frequency, detection limit and field-of-view, this article details each stage of both radioscopy chains: principles and technical characteristics. Then, linacs and cameras synchronization (at few hundred Hertz), data flows and storage setups are detailed. Finally, experimental characterizations and performance validations on phantom are presented. (authors)

  13. Upgrading nuclear safeguards in Kazakhstan

    International Nuclear Information System (INIS)

    Hunt, Maribeth; Murakami, Kenji

    2005-01-01

    accurately account for the nuclear material received, and to generally upgrade the safety, security, and accountancy standards. While the material that is actually in hold-up may not be of particular concern with respect to nuclear proliferation and nuclear security, a plant's declaration of hold-up may be a way of concealing diversion of nuclear material. Overstating the amount of material in hold-up can allow an operator to divert material. In the past, neither the UMP nor the IAEA has had an accurate estimate of the material designated as hold-up. When the hold-up of a plant can be characterized and verified it assures that this proliferation pathway is protected. During the PIV in September 2004, the Agency used its ISOCS system to re-measure points that had been measured during the PIV in 2003 and to measure points that the operator had measured with the systems provided by the Japanese and the United States. The result was that at the Physical Inventory Taking in 2004, UMP staff were able to make an effective declaration of hold-up and the Agency was able to verify it. At the same time, the rest of the work of the donor States was progressing. The funding from the Japanese government has assured the preparation of three procedures to standardize the nuclear material accountancy and control at the UMP and has sponsored the training of two UMP safeguards officials in Japan. One of the original goals of this integrated project was to significantly reduce, by 2005, the uncertainty in the measurement of hold-up at the UMP. Through the concerted efforts of the IAEA, donor States, and the European Union, this goal was reached in September 2004. Over the next year, work will concentrate on further training of personnel, the Russian translation and distribution of the procedures funded by the Japanese government, coordinating the delivery and installation of equipment from the United States, and UMP staff training in safeguards and safety culture

  14. Superconducting magnet development for the LHC upgrades

    International Nuclear Information System (INIS)

    Rossi, Lucio

    2012-01-01

    LHC is now delivering proton and heavy ion collisions at the highest energy. Upgrading the LHC beyond its design performance is a long term program that started during the LHC construction, with some fundamental R and D programs. The upgrade program is based on a vigorous superconductor and magnet R and D, aimed at increasing the field in accelerator magnets from 8 T to 12 T for the luminosity upgrade, with the scope of increasing the collider luminosity by a factor 5 to 10 from 2022. The upgrade program might continue with the LHC energy upgrade, which would require magnets producing field in the range of 16-20 T. The results obtained so far and the future challenges are discussed together with the possible plan to reach the goals. (author)

  15. Luciola Hypertelescope Space Observatory. Versatile, Upgradable High-Resolution Imaging,from Stars to Deep-Field Cosmology

    Science.gov (United States)

    Labeyrie, Antoine; Le Coroller, Herve; Dejonghe, Julien; Lardiere, Olivier; Aime, Claude; Dohlen, Kjetil; Mourard, Denis; Lyon, Richard; Carpenter, Kenneth G.

    2008-01-01

    Luciola is a large (one kilometer) "multi-aperture densified-pupil imaging interferometer", or "hypertelescope" employing many small apertures, rather than a few large ones, for obtaining direct snapshot images with a high information content. A diluted collector mirror, deployed in space as a flotilla of small mirrors, focuses a sky image which is exploited by several beam-combiner spaceships. Each contains a pupil densifier micro-lens array to avoid the diffractive spread and image attenuation caused by the small sub-apertures. The elucidation of hypertelescope imaging properties during the last decade has shown that many small apertures tend to be far more efficient, regarding the science yield, than a few large ones providing a comparable collecting area. For similar underlying physical reasons, radio-astronomy has also evolved in the direction of many-antenna systems such as the proposed Low Frequency Array having hundreds of thousands of individual receivers . With its high limiting magnitude, reaching the mv=30 limit of HST when 100 collectors of 25cm will match its collecting area, high-resolution direct imaging in multiple channels, broad spectral coverage from the 1200 Angstrom ultra-violet to the 20 micron infra-red, apodization, coronagraphic and spectroscopic capabilities, the proposed hypertelescope observatory addresses very broad and innovative science covering different areas of ESA s Cosmic Vision program. In the initial phase, a focal spacecraft covering the UV to near IR spectral range of EMCCD photon-counting cameras ( currently 200 to 1000nm), will image details on the surface of many stars, as well as their environment, including multiple stars and clusters. Spectra will be obtained for each resel. It will also image neutron star, black-hole and micro-quasar candidates, as well as active galactic nuclei, quasars, gravitational lenses, and other Cosmic Vision targets observable with the initial modest crowding limit. With subsequent upgrade

  16. The Fermilab ACNET upgrade

    International Nuclear Information System (INIS)

    Briegel, C.; Johnson, G.; Winterowd, L.

    1990-01-01

    The Fermilab Accelerator Controls Network (ACNET) upgrade consists of a new physical medium (IEEE 802.5 token ring), additions to the calling sequence and added processor support. ACNET is the accelerator control backbone network for all data communication. A proprietary network was replaced by an IEEE standard enabling an open network with excellent characteristics for the control system. The calling sequence was enhanced for the added capabilities of the token-ring interface such as 'gather-read' and 'scatter-write'. In addition to prior support of DEC PDP11s under RS11M and VAXs under VMS, the ACNET calling sequence was implemented in the language C for the IBM PC with MS-DOS and Motorola 680x0 with MTOS using VME bus. Additional support is in progress for Intel 80x86 with MTOS using Multibus II. (orig.)

  17. Upgrade tracking with the UT Hits

    CERN Document Server

    Gandini, P; Wang, J

    2014-01-01

    The performance of the LHCb tracking system for the upgrade on long tracks is evaluated in terms of efficiency and ghost rate reduction for several different sets of requirements. We find that the efficiency is quite high and that the ghost rate reduction is substantial. We also describe the current algorithm for adding UT hits to the tracks.

  18. Upgrading safety systems of industrial irradiation facilities

    International Nuclear Information System (INIS)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L.; Thomé, Z.D.

    2017-01-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  19. Upgrading safety systems of industrial irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L., E-mail: rogeriog@cnen.gov.br, E-mail: jlopes@cnen.gov.br, E-mail: evaldo@cnen.gov.br, E-mail: mara@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Thomé, Z.D., E-mail: zielithome@gmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Seção de Engenharia Nuclear

    2017-07-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  20. Missile signal processing common computer architecture for rapid technology upgrade

    Science.gov (United States)

    Rabinkin, Daniel V.; Rutledge, Edward; Monticciolo, Paul

    2004-10-01

    may be programmed under existing real-time operating systems using parallel processing software libraries, resulting in highly portable code that can be rapidly migrated to new platforms as processor technology evolves. Use of standardized development tools and 3rd party software upgrades are enabled as well as rapid upgrade of processing components as improved algorithms are developed. The resulting weapon system will have a superior processing capability over a custom approach at the time of deployment as a result of a shorter development cycles and use of newer technology. The signal processing computer may be upgraded over the lifecycle of the weapon system, and can migrate between weapon system variants enabled by modification simplicity. This paper presents a reference design using the new approach that utilizes an Altivec PowerPC parallel COTS platform. It uses a VxWorks-based real-time operating system (RTOS), and application code developed using an efficient parallel vector library (PVL). A quantification of computing requirements and demonstration of interceptor algorithm operating on this real-time platform are provided.

  1. Completion of the brightness upgrade of the ALS

    International Nuclear Information System (INIS)

    Steier, C; Madur, A; Bailey, B; Berg, K; Biocca, A; Black, A; Casey, P; Colomb, D; Gunion, B; Li, N; Marks, S; Nishimura, H; Pappas, C; Petermann, K; Portmann, G; Prestemon, S; Rawlins, A; Robin, D; Rossi, S; Scarvie, T

    2014-01-01

    The Advanced Light Source (ALS) at Berkeley Lab remains one of the brightest sources for soft x-rays worldwide. A multiyear upgrade of the ALS is underway, which includes new and replacement x-ray beamlines, a replacement of many of the original insertion devices and many upgrades to the accelerator. The accelerator upgrade that affects the ALS performance most directly is the ALS brightness upgrade [1], which reduces the horizontal emittance from 6.3 to 2.0 nm (2.5 nm effective). Magnets for this upgrade were installed in late 2012 and early 2013 followed by user operation with the reduced emittance.

  2. UPGRADES

    CERN Multimedia

    D. Contardo and J. Spalding

    2012-01-01

      Good progress is being made on the projects that will be installed during LS1. CSC chamber production for ME4/2 is progressing at a rate of four chambers per month, with 25 built so far, and the new electronics for ME1/1 is undergoing a pre-production integration testing. For the RPC chambers, gap production is underway with first deliveries to the chamber assembly sites at CERN and Ghent. The third site at Mumbai will begin production next month. For the PMT replacement in the forward hadron calorimeters (HF), the 1728 PMTs are all characterised and ready to be installed. Testing of the electronics boards is going well. Preparations to replace the HPDs in the outer calorimeter (HO) with SiPMs are also on-track. All components are at CERN and burn-in of the new front-end electronics is proceeding. There are three major upgrade projects targeting the period from LS1 through LS2: a new pixel detector, upgraded photo-detectors and electronics for HCAL, and development of a new L1 Trigger. The new ...

  3. UPGRADES

    CERN Multimedia

    Didier Contardo

    2012-01-01

      The CMS Upgrade Programme is making good progress on the LS1 and Phase 1 projects, in the planning for Phase 2. The construction of the ME4/2 muon chambers to be installed during LS1 has started and the two first CSC production chambers have been fully qualified. The three muon groups have recently established a set of milestones towards the completion of their project, that will be integrated in the detailed planning and scheduling for the shutdown work established by Technical Coordination. The project to replace the photo-detectors in the HF and HO calorimeters is also well advanced and at the validation stage. The operation of an HF slice with new multi-anode PMTs and back-end electronics has already been demonstrated in 2012. For the Phase 1 data-taking, as discussed in the Chamonix workshop, it is likely that the LHC performance will exceed the nominal luminosity and pile-up before the second shutdown, still scheduled in 2018. The collaboration is therefore pursuing a strategy to upgrade ...

  4. HE upgrade beyond phase 1. Finger scintillator option.

    CERN Document Server

    Afanasiev, Sergey; Boyarintsev, A.Yu; Emeliantchik, Igor; Golutvin, Igor; Grinyov, B.V; Ershov, Yuri; Levchuk, Leonid; Litomin, Aliaksandr; Malakhov, Alexander; Moisenz, Petr; Popov, V.F; Shumeiko, Nikolai; Smirnov, Vitaly; Sorokin, Pavlo; Zhmurin, Petro

    2014-01-01

    CMS hadron calorimeters (HB, HE, HO) have been in operation for several years and contributed substantially to the success of the CMS Physics Program. The endcap calorimeter HE suffered more radiation damage than anticipated causing rapid degradation of scintillator segments (tiles) which have a higher radiation flux from secondary particles than HB and HO. A proposal to upgrade of HE calorimeter will provide a solution for survivability at future LHC higher luminosity. A finger-strip plastic scintillator option has many advantages and is a lower cost alternative to keep the excellent HE performance at high luminosity. Measurements and simulations have been performed and this method is a good upgrade strategy.

  5. Visible light mediated upgrading of biomass to biofuel

    Science.gov (United States)

    AgPd@g-C3N4, comprising heterogenized Ag and Pdnanoparticles on graphitic carbon nitride, g-C3N4, has beensynthesized and used for the upgrading of biofuel as exemplifiedby the hydrodeoxygenation of lignin-derived vanillin underphotochemical conditions using formic acid. The bimetallicframework is found to be highly active due to the synergisticeffects of Ag and Pd with the graphitic carbon nitride support andtheir mutual interaction.This dataset is associated with the following publication:Varma , R., M. Nadagouda , S. Verma, and R.B. Nasir Baig. Visible light mediated upgrading of biomass to biofuel. Energy & Environmental Science. RSC Publishing, Cambridge, UK, 18(5): 1327-1333, (2016).

  6. The North West Sturgeon Upgrader: Good Money after Bad?

    Directory of Open Access Journals (Sweden)

    F.L. Ted Morton

    2015-04-01

    Full Text Available The North West Upgrader (NWU project illustrates the risks of government-led efforts to diversify Alberta’s economy. What began as a low-risk, low-cost project to encourage domestic bitumen upgrading has morphed into a multi-billion dollar boondoggle with high risks for Alberta taxpayers. Originally, the Government of Alberta (GOA intended to collect bitumen from producers in lieu of royalties and sell it to provincial upgraders, adding value to the commodity and creating jobs and revenues in Alberta. The private sector was to build and finance the new upgraders, as well as assume the market risks of low margins. The 2008 financial collapse effectively killed that plan. With just one prospect (NWU remaining, the Stelmach government decided to be more than the middleman. The GOA committed to retain ownership of the bitumen up to the point of sale, pay NWU a toll for the processing, and then sell the upgraded product. Under a new “take or pay” arrangement, the GOA assumed liabilities estimated at $19 billion over the 30-year contract with NWU, as well as the market risk of having to sell the upgraded product at below costs. As four different premiers and six different energy ministers cycled through Edmonton, construction costs soared to over $8 billion. The original $6.5 billion cap on the GOA’s liability for construction costs disappeared, and the GOA—and by extension, Alberta taxpayers— are now on the hook for $26 billion in processing payments — the equivalent of $63 per barrel. Falling oil prices are further undermining the prospects for the investment to break even. Written from a rare insider’s perspective, this paper analyzes the lack of effective government oversight and due diligence surrounding the North West Upgrade. Rather than being an exception, NWU fits the larger and longer pattern of failed “forced-growth” diversification initiatives in Alberta and other provinces. Alberta politicians should think long and

  7. Development of a high rate TPC. The ALICE TPC upgrade after LS2

    Energy Technology Data Exchange (ETDEWEB)

    Ball, Markus [Rheinische Friedrich-Wilhelms-Universitaet Bonn (Germany); Collaboration: ALICE-Collaboration

    2016-07-01

    The ALICE (A Large Ion Collider Experiment at CERN) collaboration plans an upgrade of the detector system during the second long shutdown of the LHC, during which the interaction rate will be increased to 50 kHz for Pb-Pb collisions. This demands operation of the Time Projection Chamber (TPC) in an ungated continuous mode. A conventional gating grid can not be used to prevent ions drifting back into the drift volume. Micro Pattern Gaseous Detectors (MPGD) such as GEMs and Micromegas offer suppression of the ion backflow. To keep distortions due to space-charge at a tolerable level an ion yield of 10 to 20 back drifting ions per incoming electron is required. However, the need for low ion backflow might be in conflict to other key parameters such as the detector performance and stability of the system. Therefore a careful optimisation of all three requirements was needed. Furthermore the large scale capability of the system has to be guaranteed. Test beams have been carried out to study the large scale performance with an Inner Readout Chamber (IROC) equipped with a multiple GEM system. Also an quadruple GEM Outer Readout Chamber (OROC) was assembled and successfully operated being the largest detector of this type. The upgrade of all readout chambers with a quadruple GEM system has started in 2016. The strategy and the work flow of the TPC upgrade are presented.

  8. MAPS development for the ALICE ITS upgrade

    Science.gov (United States)

    Yang, P.; Aglieri, G.; Cavicchioli, C.; Chalmet, P. L.; Chanlek, N.; Collu, A.; Gao, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Kim, D.; Kim, J.; Lattuca, A.; Marin Tobon, C. A.; Marras, D.; Mager, M.; Martinengo, P.; Mazza, G.; Mugnier, H.; Musa, L.; Puggioni, C.; Rousset, J.; Reidt, F.; Riedler, P.; Snoeys, W.; Siddhanta, S.; Usai, G.; van Hoorne, J. W.; Yi, J.

    2015-03-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips.

  9. LHCb: Upgrade of the LHCb calorimeter electronics

    CERN Multimedia

    Mauricio Ferre, J

    2013-01-01

    The LHCb collaboration foresees a major upgrade of the detector for the high luminosity run that should take place after 2018. Apart from the increase of the instantaneous luminosity at the interaction point of the experiment, one of the major ingredients of this upgrade is a full readout at 40MHz of the sub-detectors and the acquisition of the data by a large farm of PC. The trigger will be done by this farm and should increase the overall trigger efficiency with respect to the current detector, especially in hadronic B meson decays. A general overview of the modifications foreseen to the calorimeter system and the integration of the electromagnetic and hadronic calorimeters in this new scheme will be described.

  10. Dynamics of Techonology Upgrading of the Central and Eastern Europe Countries in a Comparative Perspective

    DEFF Research Database (Denmark)

    Jindra, Björn; Lacasa, Iciar Dominguez; Radosevic, Slavo

    applications to national offices). Structural change in technological knowledge is depicted by the share of transnational patent applications in high technology fields and knowledge-intensive activities and by calculating a technological diversification index. To capture interaction with global economy......This report explores patterns of technology upgrading as a three-dimensional process which consists of (i) intensity of technology upgrading, (ii) structural change, and (iii) interaction with the global economy. The specificity of our report is that we depict patterns of technology upgrading...... is within the BRIC pattern (with exception of China which in terms of technology upgrading has de facto delinked from BRICS). In the BRIC context, the CEE characterize very open innovation system with a high share of coinventions and foreign actors exploiting local inventions. This reveals weak...

  11. Initial results of the high resolution edge Thomson scattering upgrade at DIII-D.

    Science.gov (United States)

    Eldon, D; Bray, B D; Deterly, T M; Liu, C; Watkins, M; Groebner, R J; Leonard, A W; Osborne, T H; Snyder, P B; Boivin, R L; Tynan, G R

    2012-10-01

    Validation of models of pedestal structure is an important part of predicting pedestal height and performance in future tokamaks. The Thomson scattering diagnostic at DIII-D has been upgraded in support of validating these models. Spatial and temporal resolution, as well as signal to noise ratio, have all been specifically enhanced in the pedestal region. This region is now diagnosed by 20 view-chords with a spacing of 6 mm and a scattering length of just under 5 mm sampled at a nominal rate of 250 Hz. When mapped to the outboard midplane, this corresponds to ~3 mm spacing. These measurements are being used to test critical gradient models, in which pedestal gradients increase in time until a threshold is reached. This paper will describe the specifications of the upgrade and present initial results of the system.

  12. Upgraded readout electronics for the ATLAS LAr Calorimeter at the High Luminosity LHC

    CERN Document Server

    Andeen, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce a total of 182,486 signals which are digitized and processed by the front-end and back-end electronics at every triggered event. In addition, the front-end electronics is summing analog signals to provide coarsely grained energy sums, called trigger towers, to the first-level trigger system, which is optimized for nominal LHC luminosities. However, the pile-up noise expected during the High Luminosity phases of LHC will be increased by factors of 3 to 7. An improved spatial granularity of the trigger primitives is therefore proposed in order to improve the identification performance for trigger signatures, like electrons or photons, at high background ejection rates. For the first upgrade phase [1] in 2018, new digital tower builder boards (sTBB) are being designed to receive higher granularity signals, digitize them on detector and send them via fast optical links to a new digital processing system (DPS). The DPS applies a digital filtering and identifies sig...

  13. Parity Violation in DIS region with SoLID at the upgraded 12 GeV JLab

    Science.gov (United States)

    Tian, Ye; SoLID Collaboration

    2017-09-01

    In this talk, an overview of PVDIS future experiment by using a Solenoidal Large Intensity Device (SoLID) at Jefferson Lab (JLab) Hall A with the 12 GeV upgrade, along with a brief description of the proposed SoLID spectrometer is discussed. We will obtain data with high statistic and large kinematic coverage for Bjorken 0.3 physics of searching for charge asymmetry violation in PDF's and higher-twist effects with quark-quark correlations. In addition, the proton target experiment can be a powerful probe of the d / u ratio at high x without any nuclear correction. The designed SoLID spectrometer with its unique feature of high luminosity and large acceptance provides an opportunity to probe physics beyond the Standard Model.

  14. ATLAS calorimeter and topological trigger upgrades for Phase 1

    CERN Document Server

    Silverstein, S

    2011-01-01

    The ATLAS Level-1 Calorimeter Trigger (L1Calo) collaboration is pursuing two hardware upgrade programs for Phase 1 of the LHC upgrade. The first of these is development of a new mixed-signal multi-chip module (MCM) for the PreProcessor system. based on faster FADCs and a modern FPGA. Designed as a drop-in replacement for the existing MCM, the FPGA also enables future upgrades to the PreProcessor algorithms, including enhanced digital filtering and compensation for time-variation of pedestals. It is also planned to augment the current multiplicity-based trigger by adding topology-based algorithms. This is made possible by adding jet and EM/hadron Regions of Interest (ROIs) to the L1Calo real time data path. A synchronous, pipelined topological processor (TP) based on high-density FPGAs and multi-Gbit optical links gathers all ROI information and performs topological algorithms.

  15. Nodal kinetics model upgrade in the Penn State coupled TRAC/NEM codes

    International Nuclear Information System (INIS)

    Beam, Tara M.; Ivanov, Kostadin N.; Baratta, Anthony J.; Finnemann, Herbert

    1999-01-01

    The Pennsylvania State University currently maintains and does development and verification work for its own versions of the coupled three-dimensional kinetics/thermal-hydraulics codes TRAC-PF1/NEM and TRAC-BF1/NEM. The subject of this paper is nodal model enhancements in the above mentioned codes. Because of the numerous validation studies that have been performed on almost every aspect of these codes, this upgrade is done without a major code rewrite. The upgrade consists of four steps. The first two steps are designed to improve the accuracy of the kinetics model, based on the nodal expansion method. The polynomial expansion solution of 1D transverse integrated diffusion equation is replaced with a solution, which uses a semi-analytic expansion. Further the standard parabolic polynomial representation of the transverse leakage in the above 1D equations is replaced with an improved approximation. The last two steps of the upgrade address the code efficiency by improving the solution of the time-dependent NEM equations and implementing a multi-grid solver. These four improvements are implemented into the standalone NEM kinetics code. Verification of this code was accomplished based on the original verification studies. The results show that the new methods improve the accuracy and efficiency of the code. The verification of the upgraded NEM model in the TRAC-PF1/NEM and TRAC-BF1/NEM coupled codes is underway

  16. Technical Design Report for the Upgrade of the ALICE Inner Tracking System

    CERN Document Server

    Abelev, B; Adamová, D; Aggarwal, M M; Aglieri Rinella, G; Agnello, M; Agostinelli, A; Agrawal, N; Ahammed, Z; Ahmad, N; Ahmad Masoodi, A; Ahmed, I; Ahn, S U; Ahn, S A; Aimo, I; Aiola, S; Ajaz, M; Akindinov, A; Aleksandrov, D; Alessandro, B; Alexandre, D; Alici, A; Alkin, A; Alme, J; Alt, T; Altini, V; Altinpinar, S; Altsybeev, I; Alves Garcia Prado, C; Anderssen, E C; Andrei, C; Andronic, A; Anguelov, V; Anielski, J; Anticic, T; Antinori, F; Antonioli, P; Aphecetche, L; Appelshäuser, H; Arbor, N; Arcelli, S; Armesto, N; Arnaldi, R; Aronsson, T; Arsene, I C; Arslandok, M; Augustinus, A; Averbeck, R; Awes, T C; Azmi, M D; Bach, M; Badalà, A; Baek, Y W; Bagnasco, S; Bailhache, R; Bairathi, V; Bala, R; Baldisseri, A; Baltasar Dos Santos Pedrosa, F; Bán, J; Baral, R C; Barbera, R; Barile, F; Barnaföldi, G G; Barnby, L S; Barret, V; Bartke, J; Basile, M; Bastian Van Beelen, J; Bastid, N; Basu, S; Bathen, B; Batigne, G; Battistin, M; Batyunya, B; Batzing, P C; Baudot, J; Baumann, C; Bearden, I G; Beck, H; Bedda, C; Behera, N K; Belikov, I; Bellini, F; Bellwied, R; Belmont-Moreno, E; Bencedi, G; Benettoni, M; Benotto, F; Beole, S; Berceanu, I; Bercuci, A; Berdnikov, Y; Berenyi, D; Berger, M E; Bertens, R A; Berzano, D; Besson, A; Betev, L; Bhasin, A; Bhati, A K; Bhatti, A; Bhattacharjee, B; Bhom, J; Bianchi, L; Bianchi, N; Bianchin, C; Bielcík, J; Bielcíková, J; Bilandzic, A; Bjelogrlic, S; Blanco, F; Blau, D; Blume, C; Bock, F; Boehmer, F V; Bogdanov, A; Boggild, H; Bogolyubsky, M; Boldizsár, L; Bombara, M; Book, J; Borel, H; Borissov, A; Bornschein, J; Borshchov, V N; Bortolin, C; Bossú, F; Botje, M; Botta, E; Böttger, S; Braun-Munzinger, P; Breitner, T; Broker, T A; Browning, T A; Broz, M; Bruna, E; Bruno, G E; Budnikov, D; Buesching, H; Bufalino, S; Buncic, P; Busch, O; Buthelezi, Z; Caffarri, D; Cai, X; Caines, H; Caliva, A; Calvo Villar, E; Camerini, P; Canoa Roman, V; Carena, F; Carena, W; Cariola, P; Carminati, F; Casanova Díaz, A; Castillo Castellanos, J; Casula, E A R; Catanescu, V; Caudron, T; Cavicchioli, C; Ceballos Sanchez, C; Cepila, J; Cerello, P; Chang, B; Chapeland, S; Charvet, J L; Chattopadhyay, S; Chattopadhyay, S; Cherney, M; Cheshkov, C; Cheynis, B; Chibante Barroso, V; Chinellato, D D; Chochula, P; Chojnacki, M; Choudhury, S; Christakoglou, P; Christensen, C H; Christiansen, P; Chujo, T; Chung, S U; Cicalo, C; Cifarelli, L; Cindolo, F; Claus, G; Cleymans, J; Colamaria, F; Colella, D; Coli, S; Colledani, C; Collu, A; Colocci, M; Conesa Balbastre, G; Conesa del Valle, Z; Connors, M E; Contin, G; Contreras, J G; Cormier, T M; Corrales Morales, Y; Cortese, P; Cortés Maldonado, I; Cosentino, M R; Costa, F; Crochet, P; Cruz Albino, R; Cuautle, E; Cunqueiro, L; Dainese, A; Dang, R; Danu, A; Da Riva, E; Das, D; Das, I; Das, K; Das, S; Dash, A; Dash, S; De, S; Decosse, C; Delagrange, H; Deloff, A; Dénes, E; D'Erasmo, G; de Barros, G O V; De Caro, A; de Cataldo, G; de Cuveland, J; De Falco, A; De Gruttola, D; De Marco, N; De Pasquale, S; De Robertis, G; De Roo, K; de Rooij, R; Diaz Corchero, M A; Dietel, T; Divià, R; Di Bari, D; Di Liberto, S; Di Mauro, A; Di Nezza, P; Djuvsland, o; Dobrin, A; Dobrowolski, T; Domenicis Gimenez, D; Dönigus, B; Dordic, O; Dorheim, S; Dorokhov, A; Doziere, G; Dubey, A K; Dubla, A; Ducroux, L; Dulinski, W; Dupieux, P; Dutta Majumdar, A K; Ehlers III, R J; Elia, D; Engel, H; Erazmus, B; Erdal, H A; Eschweiler, D; Espagnon, B; Estienne, M; Esumi, S; Evans, D; Evdokimov, S; Eyyubova, G; Fabris, D; Faivre, J; Falchieri, D; Fantoni, A; Fasel, M; Fehlker, D; Feldkamp, L; Felea, D; Feliciello, A; Feofilov, G; Ferencei, J; Fernández Téllez, A; Ferreiro, E G; Ferretti, A; Festanti, A; Figiel, J; Figueredo, M A S; Filchagin, S; Finogeev, D; Fionda, F M; Fiore, E M; Fiorenza, G; Floratos, E; Floris, M; Foertsch, S; Foka, P; Fokin, S; Fragiacomo, E; Francescon, A; Franco, M; Frankenfeld, U; Fuchs, U; Furget, C; Fusco Girard, M; Gaardhoje, J J; Gagliardi, M; Gajanana, D; Gallio, M; Gangadharan, D R; Ganoti, P; Garabatos, C; Garcia-Solis, E; Gargiulo, C; Garishvili, I; Gerhard, J; Germain, M; Gheata, A; Gheata, M; Ghidini, B; Ghosh, P; Ghosh, S K; Gianotti, P; Giubilato, P; Giubellino, P; Gladysz-Dziadus, E; Glässel, P; Gomez, R; Gomez Marzoa, M; González-Zamora, P; Gorbunov, S; Görlich, L; Gotovac, S; Graczykowski, L K; Grajcarek, R; Greiner, L C; Grelli, A; Grigoras, A; Grigoras, C; Grigoriev, V; Grigoryan, A; Grigoryan, S; Grinyov, B; Grion, N; Grondin, D; Grosse-Oetringhaus, J F; Grossiord, J -Y; Grosso, R; Guber, F; Guernane, R; Guerzoni, B; Guilbaud, M; Gulbrandsen, K; Gulkanyan, H; Gunji, T; Gupta, A; Gupta, R; H Khan, K; Haake, R; Haaland, o; Hadjidakis, C; Haiduc, M; Hamagaki, H; Hamar, G; Hanratty, L D; Hansen, A; Harris, J W; Hartmann, H; Harton, A; Hatzifotiadou, D; Hayashi, S; Heckel, S T; Heide, M; Helstrup, H; Hennes, E; Herghelegiu, A; Herrera Corral, G; Hess, B A; Hetland, K F; Hicks, B; Hillemanns, H; Himmi, A; Hippolyte, B; Hladky, J; Hristov, P; Huang, M; Hu-Guo, C; Humanic, T J; Hutter, D; Hwang, D S; Igolkin, S; Ijzermans, P; Ilkaev, R; Ilkiv, I; Inaba, M; Incani, E; Innocenti, G M; Ionita, C; Ippolitov, M; Irfan, M; Ivanov, M; Ivanov, V; Ivanytskyi, O; Jacholkowski, A; Jadlovsky, J; Jahnke, C; Jang, H J; Janik, M A; Jayarathna, P H S Y; Jena, S; Jimenez Bustamante, R T; Jones, P G; Jung, H; Junique, A; Jusko, A; Kalcher, S; Kalinak, P; Kalweit, A; Kamin, J; Kang, J H; Kaplin, V; Kar, S; Karasu Uysal, A; Karavichev, O; Karavicheva, T; Karpechev, E; Kebschull, U; Keidel, R; Keil, M; Ketzer, B; Khan, M Mohisin; Khan, P; Khan, S A; Khanzadeev, A; Kharlov, Y; Kileng, B; Kim, B; Kim, D; Kim, D W; Kim, D J; Kim, J S; Kim, M; Kim, M; Kim, S; Kim, T; Kirsch, S; Kisel, I; Kiselev, S; Kisiel, A; Kiss, G; Klay, J L; Klein, J; Klein-Bösing, C; Kluge, A; Knichel, M L; Knospe, A G; Kobdaj, C; Kofarago, M; Köhler, M K; Kollegger, T; Kolojvari, A; Kondratiev, V; Kondratyeva, N; Konevskikh, A; Kovalenko, V; Kowalski, M; Kox, S; Koyithatta Meethaleveedu, G; Kral, J; Králik, I; Kramer, F; Kravcáková, A; Krelina, M; Kretz, M; Krivda, M; Krizek, F; Krus, M; Krymov, E B; Kryshen, E; Krzewicki, M; Kucera, V; Kucheriaev, Y; Kugathasan, T; Kuhn, C; Kuijer, P G; Kulakov, I; Kumar, J; Kurashvili, P; Kurepin, A; Kurepin, A B; Kuryakin, A; Kushpil, S; Kushpil, V; Kweon, M J; Kwon, Y; Ladron de Guevara, P; Lagana Fernandes, C; Lakomov, I; Langoy, R; Lara, C; Lardeux, A; Lattuca, A; La Pointe, S L; La Rocca, P; Lea, R; Lee, G R; Legrand, I; Lehnert, J; Lemmon, R C; Lenhardt, M; Lenti, V; Leogrande, E; Leoncino, M; León Monzón, I; Lesenechal, Y; Lévai, P; Li, S; Lien, J; Lietava, R; Lindal, S; Lindenstruth, V; Lippmann, C; Lisa, M A; Listratenko, O M; Ljunggren, H M; Lodato, D F; Loddo, F; Loenne, P I; Loggins, V R; Loginov, V; Lohner, D; Loizides, C; Lopez, X; López Torres, E; Lu, X -G; Luettig, P; Lunardon, M; Luo, J; Luparello, G; Luzzi, C; M Gago, A; M Jacobs, P; Ma, R; Maevskaya, A; Mager, M; Mahapatra, D P; Maire, A; Malaev, M; Maldonado Cervantes, I; Malinina, L; Mal'Kevich, D; Maltsev, N A; Malzacher, P; Mamonov, A; Manceau, L; Manko, V; Manso, F; Manzari, V; Mapelli, A; Marchisone, M; Mares, J; Margagliotti, G V; Margotti, A; Marín, A; Marin Tobon, C A; Markert, C; Marquard, M; Marras, D; Martashvili, I; Martin, N A; Martinengo, P; Martínez, M I; Martínez García, G; Martin Blanco, J; Martynov, Y; Mas, A; Masciocchi, S; Masera, M; Maslov, M; Masoni, A; Massacrier, L; Mastroserio, A; Mattiazzo, S; Matyja, A; Mayer, C; Mazer, J; Mazumder, R; Mazza, G; Mazzoni, M A; Meddi, F; Menchaca-Rocha, A; Mercado Pérez, J; Meres, M; Miake, Y; Mikhaylov, K; Milano, L; Milosevic, J; Mischke, A; Mishra, A N; Miskowiec, D; Mitu, C M; Mlynarz, J; Mohanty, B; Molnar, L; Mongelli, M; Montaño Zetina, L; Montes, E; Morando, M; Moreira De Godoy, D A; Morel, F; Moretto, S; Morreale, A; Morsch, A; Muccifora, V; Mudnic, E; Muhammad Bhopal, F; Muhuri, S; Mukherjee, M; Müller, H; Munhoz, M G; Murray, S; Musa, L; Musinsky, J; Nandi, B K; Nania, R; Nappi, E; Nattrass, C; Nayak, T K; Nazarenko, S; Nedosekin, A; Nicassio, M; Niculescu, M; Nielsen, B S; Nikolaev, S; Nikulin, S; Nikulin, V; Nilsen, B S; Noferini, F; Nomokonov, P; Nooren, G; Nyanin, A; Nystrand, J; Oeschler, H; Oh, S; Oh, S K; Okatan, A; Olah, L; Oleniacz, J; Oliveira Da Silva, A C; Onderwaater, J; Oppedisano, C; Ortiz Velasquez, A; Oskarsson, A; Otwinowski, J; Oyama, K; Pachmayer, Y; Pachr, M; Pagano, P; Paic, G; Painke, F; Pajares, C; Pal, S K; Palmeri, A; Panati, S; Pant, D; Pantano, D; Papikyan, V; Pappalardo, G S; Park, W J; Passfeld, A; Pastore, C; Patalakha, D I; Paticchio, V; Paul, B; Pawlak, T; Peitzmann, T; Pereira Da Costa, H; Pereira De Oliveira Filho, E; Peresunko, D; Pérez Lara, C E; Peryt, W; Pesci, A; Pestov, Y; Petagna, P; Petrácek, V; Petran, M; Petris, M; Petrovici, M; Petta, C; Pham, H; Piano, S; Pikna, M; Pillot, P; Pinazza, O; Pinsky, L; Piyarathna, D B; Ploskon, M; Planinic, M; Pluta, J; Pochybova, S; Podesta-Lerma, P L M; Poghosyan, M G; Pohjoisaho, E H O; Polichtchouk, B; Poljak, N; Pop, A; Porteboeuf-Houssais, S; Porter, J; Pospisil, V; Potukuchi, B; Prasad, S K; Preghenella, R; Prino, F; Protsenko, M A; Pruneau, C A; Pshenichnov, I; Puddu, G; Puggioni, C; Punin, V; Putschke, J; Qvigstad, H; Rachevski, A; Raha, S; Rak, J; Rakotozafindrabe, A; Ramello, L; Raniwala, R; Raniwala, S; Räsänen, S S; Rascanu, B T; Rasson, J E; Rathee, D; Rauf, A W; Razazi, V; Read, K F; Real, J S; Redlich, K; Reed, R J; Rehman, A; Reichelt, P; Reicher, M; Reidt, F; Renfordt, R; Reolon, A R; Reshetin, A; Rettig, F; Revol, J -P; Reygers, K; Riabov, V; Ricci, R A; Richert, T; Richter, M; Riedler, P; Riegler, W; Riggi, F; Rivetti, A; Rocco, E; Rodríguez Cahuantzi, M; Rodriguez Manso, A; Roed, K; Rogochaya, E; Rohni, S; Rohr, D; Röhrich, D; Romita, R; Ronchetti, F; Ronflette, L; Rosnet, P; Rossegger, S; Rossewij, M J; Rossi, A; Roudier, S; Rousset, J; Roy, A; Roy, C; Roy, P; Rubio Montero, A J; Rui, R; Russo, R; Ryabinkin, E; Ryabov, Y; Rybicki, A; Sacchetti, M; Sadovsky, S; Safarík, K; Sahlmuller, B; Sahoo, R; Sahu, P K; Saini, J; Salgado, C A; Salzwedel, J; Sambyal, S; Samsonov, V; Sanchez Castro, X; Sánchez Rodríguez, F J; sándor, L; Sandoval, A; Sano, M; Santagati, G; Santoro, R; Sarkar, D; Scapparone, E; Scarlassara, F; Scharenberg, R P; Schiaua, C; Schicker, R; Schipper, J D; Schmidt, C; Schmidt, H R; Schuchmann, S; Schukraft, J; Schulc, M; Schuster, T; Schutz, Y; Schwarz, K; Schweda, K; Scioli, G; Scomparin, E; Scott, P A; Scott, R; Segato, G; Seger, J E; Selyuzhenkov, I; Senyukhov, S; Seo, J; Serradilla, E; Sevcenco, A; Sgura, I; Shabetai, A; Shabratova, G; Shahoyan, R; Shangaraev, A; Sharma, N; Sharma, S; Shigaki, K; Shtejer, K; Sibiriak, Y; Siddhanta, S; Siemiarczuk, T; Silvermyr, D; Silvestre, C; Simatovic, G; Singaraju, R; Singh, R; Singha, S; Singhal, V; Sinha, B C; Sinha, T; Sitar, B; Sitta, M; Skaali, T B; Skjerdal, K; Smakal, R; Smirnov, N; Snellings, R J M; Snoeys, W; Sogaard, C; Soltz, R; Song, J; Song, M; Sooden, V; Soramel, F; Sorensen, S; Spacek, M; spalek, J; Spiriti, E; Sputowska, I; Spyropoulou-Stassinaki, M; Srivastava, B K; Stachel, J; Stan, I; Stefanek, G; Steinpreis, M; Stenlund, E; Steyn, G; Stiller, J H; Stocco, D; Stolpovskiy, M; Strmen, P; Suaide, A A P; Subieta Vasquez, M A; Sugitate, T; Suire, C; Suleymanov, M; suljic, M; Sultanov, R; sumbera, M; Sun, X; Susa, T; Symons, T J M; Szanto de Toledo, A; Szarka, I; Szczepankiewicz, A; Szymanski, M; Takahashi, J; Tangaro, M A; Tapia Takaki, J D; Tarantola Peloni, A; Tarazona Martinez, A; Tauro, A; Tejeda Muñoz, G; Telesca, A; Terrevoli, C; Ter Minasyan, A; Thäder, J; Thomas, D; Tieulent, R; Timmins, A R; Toia, A; Torii, H; Trubnikov, V; Trzaska, W H; Tsuji, T; Tumkin, A; Turchetta, R; Turrisi, R; Tveter, T S; Tymchuk, I T; Ulery, J; Ullaland, K; Uras, A; Usai, G L; Vajzer, M; Vala, M; Valencia Palomo, L; Valentino, V; Valin, I; Vallero, S; Vande Vyvre, P; Vannucci, L; Van Der Maarel, J; Van Hoorne, J W; van Leeuwen, M; Vargas, A; Varma, R; Vasileiou, M; Vasiliev, A; Vasta, P; Vechernin, V; Veldhoen, M; Velure, A; Venaruzzo, M; Vercellin, E; Vergara Limón, S; Verlaat, B; Vernet, R; Verweij, M; Vickovic, L; Viesti, G; Viinikainen, J; Vilakazi, Z; Villalobos Baillie, O; Vinogradov, A; Vinogradov, L; Vinogradov, Y; Virgili, T; Viyogi, Y P; Vodopyanov, A; Völkl, M A; Voloshin, K; Voloshin, S A; Volpe, G; von Haller, B; Vorobyev, I; Vranic, D; Vrláková, J; Vulpescu, B; Vyushin, A; Wagner, B; Wagner, J; Wagner, V; Wang, M; Wang, Y; Watanabe, D; Weber, M; Wessels, J P; Westerhoff, U; Wiechula, J; Wikne, J; Wilde, M; Wilk, G; Wilkinson, J; Williams, M C S; Windelband, B; Winn, M; Winter, M; Xiang, C; Yaldo, C G; Yamaguchi, Y; Yang, H; Yang, P; Yang, S; Yano, S; Yasnopolskiy, S; Yi, J; Yin, Z; Yoo, I -K; Yushmanov, I; Zaccolo, V; Zach, C; Zaman, A; Zampolli, C; Zaporozhets, S; Zarochentsev, A; Závada, P; Zaviyalov, N; Zbroszczyk, H; Zgura, I S; Zhalov, M; Zhang, F; Zhang, H; Zhang, X; Zhang, Y; Zhao, C; Zherebchevsky, V I; Zhou, D; Zhou, F; Zhou, Y; Zhu, H; Zhu, J; Zhu, X; Zichichi, A; Zimmermann, A; Zimmermann, M B; Zinovjev, G; Zoccarato, Y; Zynovyev, M; Zyzak, M; CERN. Geneva. The LHC experiments Committee; LHCC

    2014-01-01

    ALICE (A Large Ion Collider Experiment) is preparing a major upgrade of its experimental apparatus, planned for installation in the second long LHC shutdown (LS2) in the years 2018-2019. These plans are presented in the ALICE Upgrade Letter of Intent submitted to the LHCC in September 2012. A key element of the upgrade is the construction of a new, ultra-light, high-resolution Inner Tracking System based on monolithic pixel detectors. This Technical Design Report is an update of the Conceptual Design Report for the Upgrade of the ALICE Inner Tracking System, which was presented to the LHCC in September 2012. The primary focus of the ITS upgrade is on the improved performance for detection of heavy-flavour hadrons, and of thermal photons and low-mass di-electrons emitted by the QGP. The Conceptual Design Report demonstrated that it is possible to build a new silicon tracker with greatly improved features in terms of determination of the distance of closest approach to the primary vertex, tracking efficiency a...

  17. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  18. Silicon sensors for the upgrades of the CMS pixel detector

    International Nuclear Information System (INIS)

    Centis Vignali, Matteo

    2015-12-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accelerator and its injection chain. Two major upgrades will take place in the next years. The first upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2.10 34 cm -2 s -1 . A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5.10 34 cm -2 s -1 . As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The first upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout electronics that allow efficient data taking up to a luminosity of 2.10 34 cm -2 s -1 , twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at different institutes. Hamburg (University and DESY) is responsible for the production of 350 pixel modules. The second upgrade (phase II) of the pixel detector is foreseen for 2025. The innermost pixel layer of the upgraded detector will accumulate a radiation damage corresponding to an equivalent fluence of Φ eq =2.10 16 cm -2 and a dose of ∼10 MGy after an integrated luminosity of 3000 fb -1 . Several groups are investigating sensor designs and configurations able to withstand such high doses and fluences. This work is divided into two parts related to important aspects of the upgrades of the CMS pixel detector. For the phase I upgrade, a setup has been developed to provide an absolute energy calibration of the pixel modules that will constitute the detector. The calibration is obtained using monochromatic X-rays. The same setup is used to test the buffering capabilities of the modules' readout chip. The maximum rate experienced by the modules produced in

  19. Upgrade of the ATLAS Tile Calorimeter Electronics

    International Nuclear Information System (INIS)

    Carrió, F

    2015-01-01

    The Tile Calorimeter (TileCal) is the hadronic calorimeter covering the central region of the ATLAS experiment at LHC. The TileCal readout consists of about 10000 channels. The bulk of its upgrade will occur for the High Luminosity LHC phase (Phase-II) where the peak luminosity will increase 5 times compared to the design luminosity (10 34 cm −2 s −1 ) but with maintained energy (i.e. 7+7 TeV). An additional increase of the average luminosity with a factor of 2 can be achieved by luminosity levelling. This upgrade is expected to happen around 2024. The TileCal upgrade aims at replacing the majority of the on- and off- detector electronics to the extent that all calorimeter signals will be digitized and sent to the off-detector electronics in the counting room. To achieve the required reliability, redundancy has been introduced at different levels. Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies will determine which option will be selected. 10 Gbps optical links are used to read out all digitized data to the counting room while 5 Gbps down-links are used for synchronization, configuration and detector control. For the off-detector electronics a pre-processor (sROD) is being developed, which takes care of the initial trigger processing while temporarily storing the main data flow in pipeline and derandomizer memories. One demonstrator prototype module with the new calorimeter module electronics, but still compatible with the present system, is planned to be inserted in ATLAS this year

  20. The V-1 NPP and V-2 NPP upgrading

    International Nuclear Information System (INIS)

    1998-01-01

    A brief account of activities in the V-1 NPP and V-2 NPP upgrading as well as maintenance carried out by the Nuclear power plants Jaslovske Bohunice in 1997 is presented. The V-1 NPP applied the so called 'Small Backfitting Programme'covering 81 points of the Czechoslovak Atomic energy Commission Decree No 5/91. Continual upgrading continued after the Backfitting Programme completion with the Safety Report and following Nuclear Regulatory Authority of Slovak Republic (NRA SR) Decrees No 1/94 and 110/94 setting spheres and procedure for adopting and implementation of measures enabling the units to operate further on. Results of expert missions, analyses and assessments of components identified by Basic Engineering became the basis for the development of the Gradual Reconstruction Programme. The Programme outputs underwent economic and probabilistic assessing their contribution to nuclear safety. This process resulted in finalizing the Gradual Reconstruction Programme which started to be implemented in 1996 and will be completed in 1999. It is implemented by the REKON consortium and covers 17 areas including Instrumentation and Control, self-consumption emergency supply, leakage monitoring, emergency core cooling system, seismic reinforcement and radioactivity localisation. Both units will reach internationally acceptable safety standards for the remaining life-time period. The V-2 NPP Upgrading and Safety Enhancement Programme includes results of activities performed in the course of last years to define all important activities leading to enhancement of nuclear safety and performance reliability and effectiveness within the plant life-time period and to establish conditions for extending the life-time of these units for 40 years. The V-2 NPP Upgrading and Safety Enhancement Programme aims to assure safe operation with a probability of the core damages less than 10 -4 /reactor · year

  1. The Phase-I Upgrade of the ATLAS First Level Calorimeter Trigger

    CERN Document Server

    Andrei, George Victor; The ATLAS collaboration

    2017-01-01

    The ATLAS Level-1 calorimeter trigger is planning a series of upgrades in order to face the challenges posed by the upcoming increase of the LHC luminosity. The upgrade will benefit from new front-end electronics for parts of the calorimeter that provide the trigger system with digital data with a tenfold increase in granularity. This makes possible the implementation of more efficient algorithms than currently used to maintain the low trigger thresholds at much harsher LHC collision conditions. The Level-1 calorimeter system upgrade consists of an active and a passive system for digital data distribution, and three different Feature Extractor systems which run complex algorithms to identify various physics object candidates. The algorithms are implemented in firmware on custom electronics boards with up to four high speed processing FPGAs. The main characteristics of the electronic boards are a high input bandwidth, up to several TB/s per module, implemented through optical receivers, and a large number of o...

  2. Upgrading Probability via Fractions of Events

    Directory of Open Access Journals (Sweden)

    Frič Roman

    2016-08-01

    Full Text Available The influence of “Grundbegriffe” by A. N. Kolmogorov (published in 1933 on education in the area of probability and its impact on research in stochastics cannot be overestimated. We would like to point out three aspects of the classical probability theory “calling for” an upgrade: (i classical random events are black-and-white (Boolean; (ii classical random variables do not model quantum phenomena; (iii basic maps (probability measures and observables { dual maps to random variables have very different “mathematical nature”. Accordingly, we propose an upgraded probability theory based on Łukasiewicz operations (multivalued logic on events, elementary category theory, and covering the classical probability theory as a special case. The upgrade can be compared to replacing calculations with integers by calculations with rational (and real numbers. Namely, to avoid the three objections, we embed the classical (Boolean random events (represented by the f0; 1g-valued indicator functions of sets into upgraded random events (represented by measurable {0; 1}-valued functions, the minimal domain of probability containing “fractions” of classical random events, and we upgrade the notions of probability measure and random variable.

  3. Proposal to upgrade the MIPP experiment

    Energy Technology Data Exchange (ETDEWEB)

    Isenhower, D.; Sadler, M.; Towell, R.; Watson, S. [Abilene Christian Univ., TX (United States); Peterson, R. J. [Univ. of Colorado, Boulder, CO (United States); Baker, W.; Carey, D.; Christian, D.; Demarteau, M.; Jensen, D.; Johnstone, C.; Meyer, H.; Raja, R.; Ronzhin, A.; Solomey, N.; Wester, W. [Fermi National Accelerator Lab. (FNAL), Batavia, IL (United States); Gutbrod, H.; Peters, K. [GSI-Darmstadt (Germany); Feldman, G. [Harvard Univ., Cambridge, MA (United States); Torun, Y. [Illinois Inst. of Technology, Chicago, IL (United States); Messier, M. D.; Paley, J. [Indiana Univ., Bloomington, IN (United States)

    2006-09-01

    The upgraded MIPP physics results are needed for the support of NuMI projects, atmospheric cosmic ray and neutrino programs worldwide and will permit a systematic study of non-perturbative QCD interactions. The MIPP TPC is the largest contributor to the MIPP event size by far. Its readout system and electronics were designed in the 1990's and limit it to a readout rate of 60 Hz in simple events and {approx} 20 Hz in complicated events. With the readout chips designed for the ALICE collaboration at the LHC, we propose a low cost scheme of upgrading the MIPP data acquisition speed to 3000 Hz. This will also enable us to measure the medium energy numi target to be used for the NOvA/MINERvA experiments. We outline the capabilities of the upgraded MIPP detector to obtain high statistics particle production data on a number of nuclei that will help towards the understanding and simulation of hadronic showers in matter. Measurements of nitrogen cross sections will permit a better understanding of cosmic ray shower systematics in the atmosphere. In addition, we explore the possibilities of providing tagged neutral beams using the MIPP spectrometer that may be crucial for validating the Particle Flow Algorithm proposed for calorimeters for the International Linear Collider detectors. Lastly, we outline the physics potential of such a detector in understanding non-perturbative QCD processes.

  4. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  5. System and process for upgrading hydrocarbons

    Science.gov (United States)

    Bingham, Dennis N.; Klingler, Kerry M.; Smith, Joseph D.; Turner, Terry D.; Wilding, Bruce M.

    2015-08-25

    In one embodiment, a system for upgrading a hydrocarbon material may include a black wax upgrade subsystem and a molten salt gasification (MSG) subsystem. The black wax upgrade subsystem and the MSG subsystem may be located within a common pressure boundary, such as within a pressure vessel. Gaseous materials produced by the MSG subsystem may be used in the process carried out within the black wax upgrade subsystem. For example, hydrogen may pass through a gaseous transfer interface to interact with black wax feed material to hydrogenate such material during a cracking process. In one embodiment, the gaseous transfer interface may include one or more openings in a tube or conduit which is carrying the black wax material. A pressure differential may control the flow of hydrogen within the tube or conduit. Related methods are also disclosed.

  6. CANDU Digital Control Computer upgrade options

    International Nuclear Information System (INIS)

    De Jong, M.S.; De Grosbois, J.; Qian, T.

    1997-01-01

    This paper reviews the evolution of Digital Control Computers (DCC) in CANDU power plants to the present day. Much of this evolution has been to meeting changing control or display requirements as well as the replacement of obsolete, or old and less reliable technology with better equipment that is now available. The current work at AECL and Canadian utilities to investigate DCC upgrade options, alternatives, and strategies are examined. The dependence of a particular upgrade strategy on the overall plant refurbishment plans are also discussed. Presently, the upgrade options range from replacement of individual obsolete system components, to replacement of the entire DCC hardware without changing the software, to complete replacement of the DCCs with a functionally equivalent system using new control computer equipment and software. Key issues, constraints and objectives associated with these DCC upgrade options are highlighted. (author)

  7. Upgrading of bitumen using supercritical water

    Energy Technology Data Exchange (ETDEWEB)

    Kayukawa, T. [JGC Corp., Ibaraki (Japan)

    2009-07-01

    This presentation outlined the technical and economic aspects of thermal cracking by supercritical water. Supercritical water (SCW) is a commonly used method for upgrading heavy oil to produce pipeline-transportable oil from high-viscous bitumen. The process uses water and does not require hydrogen nor catalysts. Pre-heated bitumen and water enter a vertical reactor with flows of counter current at the supercritical point of water. The upgraded synthetic crude oil (SCO) and pitch are obtained from the top of the reactor when the bitumen is thermally cracked. Bench-scale studies have shown that Canadian oil sands bitumen can be converted to 80 volume per cent of SCO and 20 volume per cent of pitch. The SCO has satisfied Canadian pipeline specifications in terms of API gravity and kinetic viscosity. The kinetic viscosity of the pitch has also satisfied boiler fuel specifications. tabs., figs.

  8. Upgrading and Fixing Computers Do-it-Yourself for Dummies

    CERN Document Server

    Rathbone, Andy

    2010-01-01

    An illustrated, step-by-step guide to repairs and upgrades. Whether you want to prepare your computer for Windows 7, avoid investing in a new one, or just "go green", this fully illustrated guide has what you need. You'll learn how to add printers and new keyboards, boost your PC's performance and increase memory, improve power consumption, rev up your multimedia capacity, and much more. Step-by-step instructions are accompanied by photos that show you exactly what you should see at every stage.: Learn to perform basic upgrades and prepare your PC for high-speed Internet connections,

  9. PSI: Upgrading

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade

  10. PSI: Upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1992-09-15

    The accelerator complex at the Paul Scherrer Institute in Villigen near Zurich (PSI - formed in 1988 by combining the Federal Institute for Reactor Research and the Swiss Institute for Nuclear Research) is in the throes of a major and lengthy upgrade.

  11. Filtration engineering study to upgrade the ETF

    International Nuclear Information System (INIS)

    McDonald, F.N.N.

    1995-01-01

    Filtration technologies are evaluated which have potential to augment or upgrade the 200 Area Effluent Treatment Facility. The study was written in anticipation of treating future waste waters that have high fouling potentials. The Three ultrafilters judged to be capable of treating future waste waters are: hollow fiber, tubular, and centrifugal

  12. Biogas upgrading to biomethane. Proceedings; Biogasaufbereitung zu Biomethan. Tagungsband

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-12-05

    Within the 6th Hanauer Dialogue 'Biogas upgrading to biomethane' at 21st February, 2008, the following lectures were held: (a) Processing of biogas - an introduction (Michael Beil); (b) The climate protecting targets of the Federal Republic of Germany: Which role will play the upgrading of biogas, and which legal boundary conditions are created by the Federal Government? (Uwe Holzhammer); (c) Future strategy: CH{sub 4} grids (Juergen Schmid); (d) Biogas upgrading and biomethane utilization in Sweden (Anneli Petersson); (e) Biogas upgrading and utilization of bio methane in Switzerland (Arthur Wellinger); (f) Biogas upgrading by means of pressure swing adsorption (Alfons Schulte-Schulze Berndt); (g) Biogas upgrading by means of pressurized water washing (Ulf Richter); (h) Biogas upgrading for feeding in public grids. The case of biogas plant Bruck a.d. Leitha (Michael Harasek); (i) Biogas upgrading by means of chemical absorption according to the LP Cooab process (Jerome van Beek); (j) Practical experiences in unpressurized amine washing MT bio methane (Karsten Wuensche); (k) Biogas upgrading by means of organic physical washing with HAASE biogas amplifiers (Roland Kahn); (l) Upgrading using cryogenic technology; the GPP registered -system (Jeroen de Pater); (m) Micro Gas Distribution Systems: Alternatives to biogas upgrading and grid injection (Michael Beil, Bernd Krautkremer); (n) Feeding of exchange gas. The case of project Straelen and Kerpen (Frank Schaefer); (o) Feeding of biogas from the view of grid operators (Norbert Nordmeyer); BIOGASMAX: Biogas as Vehicle Fuel - Market Expansion to 2020 Air Quality (Michael Beil, Uwe Hoffstede); (p) Study: Feeding of biogas into the natural gas distribution system (Fachagentur Nachwachsende Rohstoffe).

  13. Integrated Instrumentation and Control Upgrade Plan

    International Nuclear Information System (INIS)

    Wilkinson, D.; Sun, B.; Wray, L.; Smith, J.

    1992-02-01

    This document presents the first industry-wide integrated research and development plan to support upgrading instrumentation and control (I ampersand C) systems in nuclear power plants in the United States. The plan encompasses both solving obsolescence problems and introducing modern I ampersand C technology into the industry. Accomplishing this plan will provide the technological base to modernize existing plants, as well as bridge the gap to meet Advanced Light Water Reactor (ALWR) requirements for modern I ampersand C systems. This plan defines Research and Development tasks to meet the identified needs for the following technical elements: Instrumentation, Control and Protection, Man-Machine Support Systems, Maintenance, Communications, Verification and Validation, and Specifications and Standards

  14. COTS Analog Prototype for LHCb's Calorimeter Upgrade

    CERN Document Server

    Abellan Beteta, Carlos; Herms i Berenguer, Atilà

    The objective of this thesis is to present a proposal for the analogue signal processing chain needed for the LHCb calorimeter upgrade improving the design used originally. The design contains several novelties: the system was designed with low noise in mind from the beginning, it is made to have good immunity to interferences stressing the fact that the board will be shared with large digital circuits, differential operational amplifiers are used in a non-standard way as a mean to obtain opposite polarity signals for the signal treatment and a way to increase the available signal in the front end electronics is proposed. The thesis starts with a brief introduction to the detector and its environment. This is followed by an explanation of the use of shapers in high energy physics detectors and the constraints that the shaper must address in the LHCb calorimeter. This leads to a chapter where the circuit design is explained starting from the analysis of the original circuit and its flaws. Once the original cir...

  15. FPGAs Emulate Microprocessors-A Successful Case for HFC NPP Digital I and C Upgrade

    International Nuclear Information System (INIS)

    Hsu, Allen; Crow, Ivan; Reese, Carl; Kim, Jong; Yang, Steve

    2014-01-01

    Field Programmable Gate Arrays (FPGAs), as programmable logic devices (PLDs) have gained a great deal of interests for implementing safety I and C applications in nuclear power plants (NPPs) largely owing to the FPGAs'potential advantage over the currently more common microprocessor-based digital I and C applications. First of all, FPGAs have adequate capabilities for most digital I and C applications in NPPs. Secondly, FPGAs provide products with longer lifetime, improve testability, and reduce the drift which occurs in analog-based systems, from hardware perspective. Thirdly, FPGAs, from software perspective, can be made simpler, less reliant on complex software such as operating systems, which should make FPGAs easier to qualify for nuclear safety applications. Fourthly, FPGAs are less vulnerable to cyber attacks when FPGAs implement the I and C systems that do not contain high-level, general purpose software that may be easily subjected to malicious modifications. Finally, FPGAs can bring cost reduction in an I and C digital upgrade because FPGAs can provide simpler licensing process than microprocessor-based digital I and C, and FPGAs can be implemented more efficiently. This paper will present one successful case for YGN Unit I and C upgrade using FPGA-based components to replace the obsolete Intel 8085 Microprocessor-based controllers. In this case, FPGAs emulated the process of the existing microprocessors and interpreted the execution of CPU processing. More than 160 of the FPGA-based SBC-01 controllers replacing the Intel 8085 Microprocessor-based Printed Circuit Boards have been installed and running successfully for safety I and C applications over the last five years. In this upgrade, the new FPGA-based controller board SBC-01 emulated the functions of Intel 8085 microprocessor correctly. It is a successful and cost-effective upgrade.vIn this paper, lifecycle design and implementation process and rigorous V and V activities that were used in the

  16. FPGAs Emulate Microprocessors-A Successful Case for HFC NPP Digital I and C Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Hsu, Allen; Crow, Ivan; Reese, Carl; Kim, Jong; Yang, Steve [Doosan HF Controls Corp, Carrollton (United States)

    2014-08-15

    Field Programmable Gate Arrays (FPGAs), as programmable logic devices (PLDs) have gained a great deal of interests for implementing safety I and C applications in nuclear power plants (NPPs) largely owing to the FPGAs'potential advantage over the currently more common microprocessor-based digital I and C applications. First of all, FPGAs have adequate capabilities for most digital I and C applications in NPPs. Secondly, FPGAs provide products with longer lifetime, improve testability, and reduce the drift which occurs in analog-based systems, from hardware perspective. Thirdly, FPGAs, from software perspective, can be made simpler, less reliant on complex software such as operating systems, which should make FPGAs easier to qualify for nuclear safety applications. Fourthly, FPGAs are less vulnerable to cyber attacks when FPGAs implement the I and C systems that do not contain high-level, general purpose software that may be easily subjected to malicious modifications. Finally, FPGAs can bring cost reduction in an I and C digital upgrade because FPGAs can provide simpler licensing process than microprocessor-based digital I and C, and FPGAs can be implemented more efficiently. This paper will present one successful case for YGN Unit I and C upgrade using FPGA-based components to replace the obsolete Intel 8085 Microprocessor-based controllers. In this case, FPGAs emulated the process of the existing microprocessors and interpreted the execution of CPU processing. More than 160 of the FPGA-based SBC-01 controllers replacing the Intel 8085 Microprocessor-based Printed Circuit Boards have been installed and running successfully for safety I and C applications over the last five years. In this upgrade, the new FPGA-based controller board SBC-01 emulated the functions of Intel 8085 microprocessor correctly. It is a successful and cost-effective upgrade.vIn this paper, lifecycle design and implementation process and rigorous V and V activities that were used in the

  17. Deployment of the Hobby-Eberly Telescope wide-field upgrade

    Science.gov (United States)

    Hill, Gary J.; Drory, Niv; Good, John M.; Lee, Hanshin; Vattiat, Brian L.; Kriel, Herman; Ramsey, Jason; Bryant, Randy; Elliot, Linda; Fowler, Jim; Häuser, Marco; Landiau, Martin; Leck, Ron; Odewahn, Stephen; Perry, Dave; Savage, Richard; Schroeder Mrozinski, Emily; Shetrone, Matthew; DePoy, D. L.; Prochaska, Travis; Marshall, J. L.; Damm, George; Gebhardt, Karl; MacQueen, Phillip J.; Martin, Jerry; Armandroff, Taft; Ramsey, Lawrence W.

    2016-07-01

    The Hobby-Eberly Telescope (HET) is an innovative large telescope, located in West Texas at the McDonald Observatory. The HET operates with a fixed segmented primary and has a tracker, which moves the four-mirror corrector and prime focus instrument package to track the sidereal and non-sidereal motions of objects. We have completed a major multi-year upgrade of the HET that has substantially increased the pupil size to 10 meters and the field of view to 22 arcminutes by replacing the corrector, tracker, and prime focus instrument package. The new wide field HET will feed the revolutionary integral field spectrograph called VIRUS, in support of the Hobby-Eberly Telescope Dark Energy Experiment (HETDEX§), a new low resolution spectrograph (LRS2), an upgraded high resolution spectrograph (HRS2), and later the Habitable Zone Planet Finder (HPF). The upgrade is being commissioned and this paper discusses the completion of the installation, the commissioning process and the performance of the new HET.

  18. The D0 detector upgrade

    International Nuclear Information System (INIS)

    Bross, A.D.

    1995-02-01

    The Fermilab collider program is undergoing a major upgrade of both the accelerator complex and the two detectors. Operation of the Tevatron at luminosities upwards of ten time that currently provided will occur in early 1999 after the commissioning of the new Fermilab Main Injector. The D0 upgrade program has been established to deliver a detector that will meet the challenges of this environment. A new magnetic tracker consisting of a superconducting solenoid, a silicon vertex detector, a scintillating fiber central tracker, and a central preshower detector will replace the current central tracking and transition radiation chambers. We present the design and performance capabilities of these new systems and describe results from physics simulations that demonstrate the physics reach of the upgraded detector

  19. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    Full Text Available Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the

  20. EBR-II fuel handling console digital upgrade

    International Nuclear Information System (INIS)

    Peters, G.G.; Wiege, D.D.; Christensen, L.J.

    1995-01-01

    The main fuel handling console and control system at the Experimental Breeder Reactor II (EBR-II) are being upgraded to a computerized system using high-end workstations for the operator interface and a programmable logic controller (PLC) for the control system. Two-dimensional (2D) and three-dimensional (3D) computer graphics will be provided for the operator which will show the relative position of under-sodium fuel handling equipment. This equipment is operated remotely with no means of directly viewing the transfer. This paper describes various aspects of the modification including reasons for the upgrade, capabilities the new system provides over the old control system, philosophies and rationale behind the new design, testing and simulation work, diagnostic features, and the advanced graphics techniques used to display information to the operator

  1. Phase I Upgrade of the CMS Hadron Calorimeter

    CERN Document Server

    Cooper, Seth Isaac

    2014-01-01

    In preparation for Run 2 (2015) and Run 3 of the LHC (2019), the CMS hadron calorimeter has begun a series of ambitious upgrades. These include new photodetectors in addition to improved front-end and back-end readout electronics. In the hadron forward calorimeter, the existing photomultiplier tubes are being replaced with thinner window, multi-anode readout models, while in the central region, the hybrid photodiodes will be replaced with silicon photomultipliers. The front-end electronics will include high precision timing readout, and the backend electronics will handle the increased data bandwidth. The barrel and endcap longitudinal segmentation will also be increased. This report will describe the motivation for the upgrade, its major components, and its current status.

  2. ALICE upgrades its powerful eyes

    CERN Multimedia

    Yuri Kharlov, ALICE Collaboration

    2013-01-01

    The ALICE Photon Spectrometer (PHOS) is a high-resolution photon detector that measures the photons coming out of the extremely hot plasma created in the lead-lead collisions at the LHC. Taking advantage of the long accelerator shut-down, the ALICE teams are now repairing and upgrading the existing modules and getting ready to install the brand-new module in time for the next run. The upgraded PHOS detector will be faster and more stable with wider acceptance and improved photon identification.   PHOS crystal matrix during repair. The key feature and the main complexity of the ALICE PHOS detector is that it operates at a temperature of -25°C, which makes it the second-coldest equipment element at the LHC after the cryogenic superconducting magnets. Since 2009 when it was installed, the PHOS detector, with its cold and warm volumes, has been immersed in airtight boxes to avoid condensation in the cold volumes. The 10,752 lead tungstate crystals of the PHOS were completely insulated fr...

  3. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  4. A compact, smart Langmuir Probe control module for MAST-Upgrade

    Science.gov (United States)

    Lovell, J.; Stephen, R.; Bray, S.; Naylor, G.; Elmore, S.; Willett, H.; Peterka, M.; Dimitrova, M.; Havranek, A.; Hron, M.; Sharples, R.

    2017-11-01

    A new control module for the MAST-Upgrade Langmuir Probe system has been developed. It is based on a Xilinx Zynq FPGA, which allows for excellent configurability and ease of retrieving data. The module is capable of arbitrary bias voltage waveform generation, and digitises current and voltage readings from 16 probes. The probes are biased and measured one at a time in a time multiplexed fashion, with the multiplexing sequence completely configurable. In addition, simultaneous digitisation of the floating potential of all unbiased probes is possible. A suite of these modules, each coupled with a high voltage amplifier, enables biasing and digitisation of 640 Langmuir Probes in the MAST-Upgrade Super-X divertor. The system has been successfully tested on the York Linear Plasma Device and on the COMPASS tokamak. It will be installed on MAST-Upgrade ready for operations in 2018.

  5. Characterization of the CBC2 readout ASIC for the CMS strip-tracker high-luminosity upgrade

    International Nuclear Information System (INIS)

    Braga, D; Hall, G; Pesaresi, M; Raymond, M; Jones, L; Murray, P; Prydderch, M

    2014-01-01

    The CMS Binary Chip 2 (CBC2) is a full-scale prototype ASIC developed for the front-end readout of the high-luminosity upgrade of the CMS silicon strip tracker. The 254-channel, 130 nm CMOS ASIC is designed for the binary readout of double-layer modules, and features cluster-width discrimination and coincidence logic for detecting high-P T track candidates. The chip was delivered in January 2013 and has since been bump-bonded to a dual-chip hybrid and extensively tested. The CBC2 is fully functional and working to specification: we present the result of electrical characterization of the chip, including gain, noise, threshold scan and power consumption, together with the performance of the stub finding logic. Finally we will outline the plan for future developments towards the production version

  6. The Reach of CERN LEP2 and Fermilab Tevatron Upgrades for Higgs Bosons in Supersymmetric Models

    CERN Document Server

    Baer, Howard W; Tata, Xerxes; Baer, Howard; Tata, Xerxes

    1999-01-01

    Luminosity upgrades of the Fermilab Tevatron pbar-p collider have been shown to allow experimental detection of a Standard Model (SM) Higgs boson up to $m_{H_{SM}}\\sim 120$ GeV via $WH_{SM} \\to \\ell\

  7. Initial performance of upgraded Tevatron cryogenic systems

    International Nuclear Information System (INIS)

    Norris, B.L.

    1996-09-01

    Fermilab began operating a re-designed satellite refrigerator systems in November 1993. Upgrades were installed to operate the Tevatron at a magnet temperature of 3.5 K, approximately 1K lower than the original design. Refrigerator upgrades included new valve boxes, larger reciprocating expanders, the installation of cold vapor compressors, new sub-atmospheric instrumentation and an entirely new distributed controls system. Cryogenic system reliability data for Colliding Physics Run 1B is presented emphasizing a failure analysis for each aspect of the upgrade. Comparison to data for Colliding Physics Run 1A (previous to upgrade) is presented to show the impact of a major system overhaul. New operational problems and their solutions are presented in detail

  8. Beam-Beam Simulation of Crab Cavity White Noise for LHC Upgrade

    CERN Document Server

    Qiang, J; Pieloni, Tatiana; Ohmi, Kazuhito

    2015-01-01

    High luminosity LHC upgrade will improve the luminosity of the current LHC operation by an order of magnitude. Crab cavity as a critical component for compensating luminosity loss from large crossing angle collision and also providing luminosity leveling for the LHC upgrade is being actively pursued. In this paper, we will report on the study of potential effects of the crab cavity white noise errors on the beam luminosity lifetime based on strong-strong beam-beam simulations.

  9. Upgrading of analogue gamma cameras with PC based computer system

    International Nuclear Information System (INIS)

    Fidler, V.; Prepadnik, M.

    2002-01-01

    Full text: Dedicated nuclear medicine computers for acquisition and processing of images from analogue gamma cameras in developing countries are in many cases faulty and technologically obsolete. The aim of the upgrading project of International Atomic Energy Agency (IAEA) was to support the development of the PC based computer system which would cost 5.000 $ in total. Several research institutions from different countries (China, Cuba, India and Slovenia) were financially supported in this development. The basic demands for the system were: one acquisition card an ISA bus, image resolution up to 256x256, SVGA graphics, low count loss at high count rates, standard acquisition and clinical protocols incorporated in PIP (Portable Image Processing), on-line energy and uniformity correction, graphic printing and networking. The most functionally stable acquisition system tested on several international workshops and university clinics was the Slovenian one with a complete set of acquisition and clinical protocols, transfer of scintigraphic data from acquisition card to PC through PORT, count loss less than 1 % at count rate of 120 kc/s, improvement of integral uniformity index by a factor of 3-5 times, reporting, networking and archiving solutions for simple MS network or server oriented network systems (NT server, etc). More than 300 gamma cameras in 52 countries were digitized and put in the routine work. The project of upgrading the analogue gamma cameras yielded a high promotion of nuclear medicine in the developing countries by replacing the old computer systems, improving the technological knowledge of end users on workshops and training courses and lowering the maintenance cost of the departments. (author)

  10. Results of high heat flux tests and structural analysis of the new solid tungsten divertor tile for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Jaksic, Nikola, E-mail: nikola.jaksic@ipp.mpg.de; Greuner, Henri; Herrmann, Albrecht; Böswirth, Bernd; Vorbrugg, Stefan

    2015-10-15

    Highlights: • The main motivation for the HHF investigation of tungsten tiles was an untypical deformation of some specimens under thermal loading, observed during the previous tests in GLADIS test facility. • A nonlinear finite element (FE) model for simulations of the GLADIS tests has been built. • The unexpected plastic deformations are mainly caused by internal stresses due to the manufacturing process. The small discrepancies among the FEA investigated and measured plastic deformations are most likely caused, beside of the practical difficulties by measuring of low items, also by tile internal stresses. • The influences of the residual stresses caused by special production processes have to be taken into account by design of the structural part made of solid tungsten. - Abstract: Tungsten as plasma-facing material for fusion devices is currently the most favorable candidate. In general solid tungsten is used for shielding the plasma chamber interior against the high heat generated from the plasma. For the purposes of implementation at ASDEX Upgrade and as a contribution to ITER the thermal performance of tungsten tiles has been extensively tested in the high heat flux test facility GLADIS during the development phase and beyond. These tests have been performed on full scale tungsten tile prototypes including their clamping and cooling structure. Simulating the adiabatically thermal loading due to plasma operation in ASDEX Upgrade, the tungsten tiles have been subjected to a thermal load with central heat flux of 10–24 MW/m{sup 2} and absorbed energy between 370 and 680 kJ. This loading results in maximum surface temperatures between 1300 °C and 2800 °C. The tests in GLADIS have been accompanied by intensive numerical investigations using FEA methods. For this purpose a multiple nonlinear finite element model has been set up. This paper discusses the main results of the high heat flux final tests and their numerical simulation. Moreover, first

  11. Results of high heat flux tests and structural analysis of the new solid tungsten divertor tile for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Jaksic, Nikola; Greuner, Henri; Herrmann, Albrecht; Böswirth, Bernd; Vorbrugg, Stefan

    2015-01-01

    Highlights: • The main motivation for the HHF investigation of tungsten tiles was an untypical deformation of some specimens under thermal loading, observed during the previous tests in GLADIS test facility. • A nonlinear finite element (FE) model for simulations of the GLADIS tests has been built. • The unexpected plastic deformations are mainly caused by internal stresses due to the manufacturing process. The small discrepancies among the FEA investigated and measured plastic deformations are most likely caused, beside of the practical difficulties by measuring of low items, also by tile internal stresses. • The influences of the residual stresses caused by special production processes have to be taken into account by design of the structural part made of solid tungsten. - Abstract: Tungsten as plasma-facing material for fusion devices is currently the most favorable candidate. In general solid tungsten is used for shielding the plasma chamber interior against the high heat generated from the plasma. For the purposes of implementation at ASDEX Upgrade and as a contribution to ITER the thermal performance of tungsten tiles has been extensively tested in the high heat flux test facility GLADIS during the development phase and beyond. These tests have been performed on full scale tungsten tile prototypes including their clamping and cooling structure. Simulating the adiabatically thermal loading due to plasma operation in ASDEX Upgrade, the tungsten tiles have been subjected to a thermal load with central heat flux of 10–24 MW/m"2 and absorbed energy between 370 and 680 kJ. This loading results in maximum surface temperatures between 1300 °C and 2800 °C. The tests in GLADIS have been accompanied by intensive numerical investigations using FEA methods. For this purpose a multiple nonlinear finite element model has been set up. This paper discusses the main results of the high heat flux final tests and their numerical simulation. Moreover, first results

  12. Towards novel biogas upgrading processes

    Energy Technology Data Exchange (ETDEWEB)

    Privalova, E.

    2013-06-01

    (VOCs) before and after biogas upgrading was studied for biogas produced through anaerobic digestion of waste waters sludge. The ionic liquid [C{sub 4}mim][OAc] demonstrated its feasibility as a promising scrubbing media and exhibited high efficiency in terms of the removal of VOCs. Upon application of this ionic liquid, the amount of identified VOCs was diminished by around 65 wt %, while the samples treated with the aqueous mixture of 15 wt % N-methyldiethanolamine with addition of 5 wt % piperazine resulted in 32 wt % reduction in the amounts of volatile organic compounds only. (orig.)

  13. Analysis of Energy Industry Upgrading in Northeast China

    Science.gov (United States)

    Liu, Xiao-jing; Ji, Yu-liang; Guan, Bai-feng; Jing, Xin

    2018-02-01

    Promoting regional economic growth and realizing the transformation of the mode of economic growth are in industrial upgrading essence The product is a carrier that represents a series of links of production, management and marketing behind the enterprise, and is a comprehensive reflection of the knowledge and ability of a country or region. Based on the industrial spatial structure, this paper visualizes the industrial space in Northeast China from 2005 to 2015, analyzes the comparative advantages of the energy industry in Northeast China, and examines the status quo of the upgrade of the energy industry according to the industrial upgrading status. Based on the industrial spatial structure, Industry intensity in the industrial space, put forward the future direction of the energy industry upgrade and upgrade path.

  14. The TEXT upgrade vertical interferometer

    International Nuclear Information System (INIS)

    Hallock, G.A.; Gartman, M.L.; Li, W.; Chiang, K.; Shin, S.; Castles, R.L.; Chatterjee, R.; Rahman, A.S.

    1992-01-01

    A far-infrared interferometer has been installed on TEXT upgrade to obtain electron density profiles. The primary system views the plasma vertically through a set of large (60-cm radialx7.62-cm toroidal) diagnostic ports. A 1-cm channel spacing (59 channels total) and fast electronic time response is used, to provide high resolution for radial profiles and perturbation experiments. Initial operation of the vertical system was obtained late in 1991, with six operating channels

  15. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  16. Resistive plate chambers for 2013-2014 muon upgrade in CMS at LHC

    International Nuclear Information System (INIS)

    Colafranceschi, S.; Sharma, A.; Chudasama, R.; Pant, L.M.; Mohanty, A.K.; Sehgal, R.; Sehgal, S.T.; Thomas, R.G.; Bhandari, V.; Chand, S.; Kumar, A.; Kumar, S.; Singh, A.; Singh, V.; Aly, S.; Aly, R.; Elkafrawy, T.; Ibrahim, A.; Radi, A.; Sayed, A.

    2014-01-01

    During 2013 and 2014 (Long Shutdown LS1) the CMS experiment is upgrading the forward region installing a fourth layer of RPC detectors in order to complete and improve the muon system performances in the view of the foreseen high luminosity run of LHC. The new two endcap disks consists of 144 double-gap RPC chambers assembled at three different production sites: CERN, Ghent (Belgium) and BARC (India). The chamber components as well as the final detectors are subjected to full series of tests established in parallel at all the production sites. All assembly and test operations have been engineered in order to standardize and improve detector production. In this work the complete chamber construction, quality control procedures and preliminary results will be detailed

  17. Technical Barriers, Gaps, and Opportunities Related to Home Energy Upgrade Market Delivery

    Energy Technology Data Exchange (ETDEWEB)

    Bianchi, M. V. A.

    2011-11-01

    This report outlines the technical barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's Building America program. The objective of this report is to outline the technical1 barriers, gaps, and opportunities that arise in executing home energy upgrade market delivery approaches, as identified through research conducted by the U.S. Department of Energy's (DOE) Building America program. This information will be used to provide guidance for new research necessary to enable the success of the approaches. Investigation for this report was conducted via publications related to home energy upgrade market delivery approaches, and a series of interviews with subject matter experts (contractors, consultants, program managers, manufacturers, trade organization representatives, and real estate agents). These experts specified technical barriers and gaps, and offered suggestions for how the technical community might address them. The potential benefits of home energy upgrades are many and varied: reduced energy use and costs; improved comfort, durability, and safety; increased property value; and job creation. Nevertheless, home energy upgrades do not comprise a large part of the overall home improvement market. Residential energy efficiency is the most complex climate intervention option to deliver because the market failures are many and transaction costs are high (Climate Change Capital 2009). The key reasons that energy efficiency investment is not being delivered are: (1) The opportunity is highly fragmented; and (2) The energy efficiency assets are nonstatus, low-visibility investments that are not properly valued. There are significant barriers to mobilizing the investment in home energy upgrades, including the 'hassle factor' (the time and effort required to identify and secure improvement works), access to financing, and the

  18. NASA/NBS (National Aeronautics and Space Administration/National Bureau of Standards) standard reference model for telerobot control system architecture (NASREM)

    Science.gov (United States)

    Albus, James S.; Mccain, Harry G.; Lumia, Ronald

    1989-01-01

    The document describes the NASA Standard Reference Model (NASREM) Architecture for the Space Station Telerobot Control System. It defines the functional requirements and high level specifications of the control system for the NASA space Station document for the functional specification, and a guideline for the development of the control system architecture, of the 10C Flight Telerobot Servicer. The NASREM telerobot control system architecture defines a set of standard modules and interfaces which facilitates software design, development, validation, and test, and make possible the integration of telerobotics software from a wide variety of sources. Standard interfaces also provide the software hooks necessary to incrementally upgrade future Flight Telerobot Systems as new capabilities develop in computer science, robotics, and autonomous system control.

  19. RF upgrade program in LHC injectors and LHC machine

    International Nuclear Information System (INIS)

    Jensen, E.

    2012-01-01

    The main themes of the RF upgrade program are: the Linac4 project, the LLRF-upgrade and the study of a tuning-free wide-band system for PSB, the upgrade of the SPS 800 MHz amplifiers and beam controls and the upgrade of the transverse dampers of the LHC. Whilst LHC Splice Consolidation is certainly the top priority for LS1, some necessary RF consolidation and upgrade is necessary to assure the LHC performance for the next 3- year run period. This includes: 1) necessary maintenance and consolidation work that could not fit the shorter technical stops during the last years, 2) the upgrade of the SPS 200 MHz system from presently 4 to 6 cavities and possibly 3) the replacement of one LHC cavity module. On the longer term, the LHC luminosity upgrade requires crab cavities, for which some preparatory work in SPS Coldex must be scheduled during LS1. (author)

  20. OMEGA upgrade staging options

    International Nuclear Information System (INIS)

    Kelly, J.H.; Shoup, M.J.; Smith, D.L.

    1989-01-01

    The authors discuss how they are designing an upgrade to its 24-beam OMEGA laser system, OMEGA is a frequency tripled, all-rod system capable of producing 2 kJ at 0.8 ns on target. Important direct-drive-target-ignition physics could be investigated with an upgraded system capable of producing a shaped pulse consisting of a long (5ns) low-intensity, foot, smoothly transitioning into a short (0.5 ns), intense, compression pulse. The total pulse energy is 30 kJ, which, from target-irradiation uniformity considerations, must be distributed over 60 beams

  1. Optimized tokamak power exhaust with double radiative feedback in ASDEX Upgrade

    Science.gov (United States)

    Kallenbach, A.; Bernert, M.; Eich, T.; Fuchs, J. C.; Giannone, L.; Herrmann, A.; Schweinzer, J.; Treutterer, W.; the ASDEX Upgrade Team

    2012-12-01

    A double radiative feedback technique has been developed on the ASDEX Upgrade tokamak for optimization of power exhaust with a standard vertical target divertor. The main chamber radiation is measured in real time by a subset of three foil bolometer channels and controlled by argon injection in the outer midplane. The target heat flux is in addition controlled by nitrogen injection in the divertor private flux region using either a thermoelectric sensor or the scaled divertor radiation obtained by a bolometer channel in the outer divertor. No negative interference of the two radiation controllers has been observed so far. The combination of main chamber and divertor radiative cooling extends the operational space of a standard divertor configuration towards high values of P/R. Pheat/R = 14 MW m-1 has been achieved so far with nitrogen seeding alone as well as with combined N + Ar injection, with the time-averaged divertor peak heat flux below 5 MW m-2. Good plasma performance can be maintained under these conditions, namely H98(y,2) = 1 and βN = 3.

  2. Utilities must leverage existing resources and upgrade technology to avoid future blackouts

    International Nuclear Information System (INIS)

    Masiello, R.

    2004-01-01

    The blackout of August 14, 2003 is used as the incentive to examine transmission grid reliability, expose its deficiencies in terms of technology, standards and processes used to manage reliability, and to make recommendations for leveraging existing resources and upgrading both the technology and procedures to avoid similar breakdowns in the future. It is recommended that in the area of monitoring transmission grid reliability utilities should borrow a page from the Enterprise Risk Management Practices of the financial industry by adopting a system which looks beyond the first 'credible' contingency (the current system) and examine many more 'incredible' contingencies, and underlying events that can trigger multiple contingencies, and plan for them in their operations. Utility companies are also urged to upgrade their energy management systems (EMS) technology to be able to deal with the kinds of severely depressed voltages and overloaded circuits that many grids experience today. Investment in new capabilities in control rooms, more and better communications will be essential. EMS algorithms and models must be upgraded to operate under a broader spectrum of grid conditions and to simulate the once-in-a-lifetime outage scenarios that most operators believe could never strike their utility. Expert opinion strongly suggests that as part of this process of upgrading, contingency analysis should shift from the 'N-1' model of the present to a stochastic model that considers a wider range of possible events in a probabilistic framework

  3. Utilities must leverage existing resources and upgrade technology to avoid future blackouts

    Energy Technology Data Exchange (ETDEWEB)

    Masiello, R. [KEMA Inc. Burlington, MA (United States)

    2004-06-01

    The blackout of August 14, 2003 is used as the incentive to examine transmission grid reliability, expose its deficiencies in terms of technology, standards and processes used to manage reliability, and to make recommendations for leveraging existing resources and upgrading both the technology and procedures to avoid similar breakdowns in the future. It is recommended that in the area of monitoring transmission grid reliability utilities should borrow a page from the Enterprise Risk Management Practices of the financial industry by adopting a system which looks beyond the first 'credible' contingency (the current system) and examine many more 'incredible' contingencies, and underlying events that can trigger multiple contingencies, and plan for them in their operations. Utility companies are also urged to upgrade their energy management systems (EMS) technology to be able to deal with the kinds of severely depressed voltages and overloaded circuits that many grids experience today. Investment in new capabilities in control rooms, more and better communications will be essential. EMS algorithms and models must be upgraded to operate under a broader spectrum of grid conditions and to simulate the once-in-a-lifetime outage scenarios that most operators believe could never strike their utility. Expert opinion strongly suggests that as part of this process of upgrading, contingency analysis should shift from the 'N-1' model of the present to a stochastic model that considers a wider range of possible events in a probabilistic framework.

  4. The Pierre Auger Observatory status and the AugerPrime upgrade program

    Directory of Open Access Journals (Sweden)

    Martello Daniele

    2017-01-01

    Full Text Available The nature and the origin of ultra-high energy cosmic rays (UHECRs, above 1017 eV, are still unknown. The Pierre Auger Observatory with its huge exposure provides us with a large set of high quality data. The analysis of these data has led to major breakthroughs in the last decade, but a coherent interpretation is still missing. To answer the open questions the Observatory has started a major upgrade, with an emphasis on improved mass composition determination using the surface detectors. The latest results and the planned detector upgrade will be presented. The expected performance and the improved physics sensitivity of the Observatory will be discussed.

  5. The Upgrade of the Control System for the CERN/NA62 Liquid Krypton Detector

    CERN Document Server

    Moraux, A; Bremer, J; Falaleev, V; Gonidec, A; Passardi, Giorgio; Pezzetti, M

    2009-01-01

    The NA62 experiment is a continuation of the CERN kaon research program and particularly of the NA48 experiment which was designed in the early 90’s to measure the direct CP violation with a very high precision. An important component of the experimental setup is an electromagnetic calorimeter filled with 9000 liters of high-purity liquid krypton at 120 K. Its associated cryogenic system aims at providing a very high reliability and stable thermal conditions with temperature stabilization better than 0.1 K. The upgrade of the cryogenic control system was motivated by the need of ensuring its durability and standardization for the long term fixed-target physics program at the CERN Super Proton Synchrotron (SPS). This paper describes the adopted technical solutions to minimize the control shutdown and emphasizes the related safety issues.

  6. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    International Nuclear Information System (INIS)

    Sunarno; Rochmadi,; Mulyono, Panut; Budiman, Arief

    2016-01-01

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  7. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    Energy Technology Data Exchange (ETDEWEB)

    Sunarno [Chemical Engineering Department, Riau University, Kampus Binawidya KM 12,5 Pekanbaru 28293 (Indonesia); Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Rochmadi,; Mulyono, Panut [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Budiman, Arief, E-mail: abudiman@ugm.ac.id [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281(Indonesia); Center for Energy Studies, Gadjah Mada University, Sekip K1A, Yogyakarta 55281 (Indonesia)

    2016-06-03

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  8. SYSTEM DESIGN AND PERFORMANCE FOR THE RECENT DIII-D NEUTRAL BEAM COMPUTER UPGRADE

    International Nuclear Information System (INIS)

    PHILLIPS, J.C; PENAFLOR, B.G; PHAM, N.Q; PIGLOWSKI, D.A.

    2004-03-01

    OAK-B135 This operating year marks an upgrade to the computer system charged with control and data acquisition for neutral beam injection system's heating at the DIII-D National Fusion Facility, funded by the US Department of Energy and operated by General Atomics (GA). This upgrade represents the third and latest major revision to a system which has been in service over twenty years. The first control and data acquisition computers were four 16 bit mini computers running a proprietary operating system. Each of the four controlled two ion source over dedicated CAMAC highway. In a 1995 upgrade, the system evolved to be two 32 bit Motorola mini-computers running a version of UNIX. Each computer controlled four ion sources with two CAMAC highways per CPU. This latest upgrade builds on this same logical organization, but makes significant advances in cost, maintainability, and the degree to which the system is open to future modification. The new control and data acquisition system is formed of two 2 GHz Intel Pentium 4 based PC's, running the LINUX operating system. Each PC drives two CAMAC serial highways using a combination of Kinetic Systems PCI standard CAMAC Hardware Drivers and a low-level software driver written in-house expressly for this device. This paper discusses the overall system design and implementation detail, describing actual operating experience for the initial six months of operation

  9. Strip detector for the ATLAS detector upgrade for the High-Luminosity LHC

    CERN Document Server

    Veloce, Laurelle Maria; The ATLAS collaboration

    2017-01-01

    The ATLAS experiment is currently preparing for an upgrade of the tracking system in the course of the High Luminosity LHC, scheduled for 2025. The expected radiation damage at an integrated luminosity of 3000fb-1 will require the tracking detectors to withstand hadron fluencies to over 1x1016 1 MeV neutron equivalent per cm2. With the addition of increased readout rates, the existing Inner Detector will have to be replaced by an all-silicon Inner Tracker (ITk) with a pixel detector surrounded by a strip detector. The ITk strip detector consists of a four-layer barrel and a forward region composed of six discs on each side of the barrel. The current prototyping phase has resulted in the ITk Strip Detector Technical Design Report (TDR), which starts the pre-production readiness phase at the involved institutes. In this contribution we present the design of the ITk Strip Detector and current status of R&D of various detector components.

  10. Strip detector for the ATLAS detector upgrade for the high-luminosity LHC

    CERN Document Server

    Madaffari, Daniele; The ATLAS collaboration

    2017-01-01

    The planned HL-LHC (High Luminosity LHC) in 2025 is being designed to maximise the physics potential of the LHC through a sizeable increase in the luminosity, reaching 1x10$^{35}$ cm$^{-2}$s$^{-1}$ after 10 years of operation. A consequence of this increased luminosity is the expected radiation damage at an integrated luminosity of 3000 fb$^{-1}$, requiring the tracking detectors to withstand hadron fluencies to over 1x10$^{16}$ 1 MeV neutron equivalent per cm$^2$. With the addition of increased readout rates, a complete re-design of the current ATLAS Inner Detector (ID) is being developed as the Inner Tracker (ITk), which will consist of both strip and pixelated silicon detectors. The physics motivations, required performance characteristics and basic design of the proposed upgrade of the strip detector will be a subject of this talk. Present ideas and solutions for the strip detector and current research and development program will be discussed.

  11. MAPS development for the ALICE ITS upgrade

    International Nuclear Information System (INIS)

    Yang, P.; Gao, C.; Huang, G.; Aglieri, G.; Cavicchioli, C.; Hillemanns, H.; Junique, A.; Kofarago, M.; Keil, M.; Kugathasan, T.; Tobon, C.A. Marin; Mager, M.; Martinengo, P.; Chalmet, P.L.; Chanlek, N.; Collu, A.; Marras, D.; Kim, D.; Kim, J.; Lattuca, A.

    2015-01-01

    Monolithic Active Pixel Sensors (MAPS) offer the possibility to build pixel detectors and tracking layers with high spatial resolution and low material budget in commercial CMOS processes. Significant progress has been made in the field of MAPS in recent years, and they are now considered for the upgrades of the LHC experiments. This contribution will focus on MAPS detectors developed for the ALICE Inner Tracking System (ITS) upgrade and manufactured in the TowerJazz 180 nm CMOS imaging sensor process on wafers with a high resistivity epitaxial layer. Several sensor chip prototypes have been developed and produced to optimise both charge collection and readout circuitry. The chips have been characterised using electrical measurements, radioactive sources and particle beams. The tests indicate that the sensors satisfy the ALICE requirements and first prototypes with the final size of 1.5 × 3 cm 2 have been produced in the first half of 2014. This contribution summarises the characterisation measurements and presents first results from the full-scale chips

  12. Upgrade of the SPIRAL identification station for high-precision measurements of nuclear β decay

    Science.gov (United States)

    Grinyer, G. F.; Thomas, J. C.; Blank, B.; Bouzomita, H.; Austin, R. A. E.; Ball, G. C.; Bucaille, F.; Delahaye, P.; Finlay, P.; Frémont, G.; Gibelin, J.; Giovinazzo, J.; Grinyer, J.; Kurtukian-Nieto, T.; Laffoley, A. T.; Leach, K. G.; Lefèvre, A.; Legruel, F.; Lescalié, G.; Perez-Loureiro, D.

    2014-03-01

    The low-energy identification station at SPIRAL (Système de Production d'Ions Radioactifs Accélérés en Ligne) has been upgraded for studying the β decays of short-lived radioactive isotopes and to perform high-precision half-life and branching-ratio measurements for superallowed Fermi and isospin T=1/2 mirror β decays. These new capabilities, combined with an existing Paul trap setup for measurements of β-ν angular-correlation coefficients, provide a powerful facility for investigating fundamental properties of the electroweak interaction through nuclear β decays. A detailed description of the design study, construction, and first results obtained from an in-beam commissioning experiment on the β+ decays 14 O and 17F are presented.

  13. Silicon Sensors for the Upgrades of the CMS Pixel Detector

    CERN Document Server

    Centis Vignali, Matteo; Schleper, Peter

    2015-01-01

    The Compact Muon Solenoid (CMS) is a general purpose detector at the Large Hadron Collider (LHC). The LHC luminosity is constantly increased through upgrades of the accel- erator and its injection chain. Two major upgrades will take place in the next years. The rst upgrade involves the LHC injector chain and allows the collider to achieve a luminosity of about 2 10 34 cm-2 s-1 A further upgrade of the LHC foreseen for 2025 will boost its luminosity to 5 10 34 cm-2 s1. As a consequence of the increased luminosity, the detectors need to be upgraded. In particular, the CMS pixel detector will undergo two upgrades in the next years. The rst upgrade (phase I) consists in the substitution of the current pixel detector in winter 2016/2017. The upgraded pixel detector will implement new readout elec- tronics that allow ecient data taking up to a luminosity of 2 10 34 cm-2s-1,twice as much as the LHC design luminosity. The modules that will constitute the upgraded detector are being produced at dierent institutes. Ham...

  14. Experimental optimization of catalytic process in-situ for heavy oil and bitumen upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Shah, A.; Fishwick, R.P.; Leeke, G.A.; Wood, J. [Birmingham Univ., Birmingham (United Kingdom); Rigby, S.P.; Greaves, M. [Bath Univ., Bath (United Kingdom)

    2010-07-01

    Peak crude oil production is expected to occur in the second decade of this century, followed by a phase of permanent decline in conventional crude oil production. However, very large resources of heavy oil and bitumen exist throughout the world, most notably in Canada and Venezuela. The high viscosity and density of these non-conventional crude oils require more energy intensive operations for production and upgrading, and also for transportation. As such, they are more costly to extract. This paper described some of the technological innovations that are being considered to extract heavier oil supplies with reduced environmental impact. The toe-to-heel air injection (THAI) process and its catalytic added-on (CAPRI) process combine in-situ combustion with catalytic upgrading using an annular catalyst packed around a horizontal producer well. Results of an experimental study concerning optimization of catalyst type and operating conditions showed that CAPRI can effect further upgrading of partially upgraded THAI oil, with upgrading levels of viscosity and API gravity dependent upon temperature and flow rate. 20 refs., 8 tabs., 10 figs.

  15. Upgrading of Intermediate Bio-Oil Produced by Catalytic Pyrolysis

    Energy Technology Data Exchange (ETDEWEB)

    Abdullah, Zia [Battelle Memorial Inst., Columbus, OH (United States); Chadwell, Brad [Battelle Memorial Inst., Columbus, OH (United States); Taha, Rachid [Battelle Memorial Inst., Columbus, OH (United States); Hindin, Barry [Battelle Memorial Inst., Columbus, OH (United States); Ralston, Kevin [Battelle Memorial Inst., Columbus, OH (United States)

    2015-06-30

    The objectives of this project were to (1) develop a process to upgrade catalytic pyrolysis bio-oil, (2) investigate new upgrading catalysts suited for upgrading catalytic pyrolysis bio-oil, (3) demonstrate upgrading system operation for more than 1,000 hours using a single catalyst charge, and (4) produce a final upgraded product that can be blended to 30 percent by weight with petroleum fuels or that is compatible with existing petroleum refining operations. This project has, to the best of our knowledge, for the first time enabled a commercially viable bio-oil hydrotreatment process to produce renewable blend stock for transportation fuels.

  16. WNP-2 core model upgrade

    International Nuclear Information System (INIS)

    Golightly, C.E.; Ravindranath, T.K.; Belblidia, L.A.; O'Farrell, D.; Andersen, P.S.

    2006-01-01

    The paper describes the core model upgrade of the WNP-2 training simulator and the reasons for the upgrade. The core model as well as the interface with the rest of the simulator are briefly described . The paper also describes the procedure that will be used by WNP-2 to update the simulator core data after future core reloads. Results from the fully integrated simulator are presented. (author)

  17. An Upgrade for the Advanced Light Source

    International Nuclear Information System (INIS)

    Chemla, Daniel S.; Feinberg, Benedict; Hussain, Zahid; Kirz, Janos; Krebs, Gary F.; Padmore, Howard A.; Robin, David S.; Robinson, Arthur L.; Smith, Neville V.

    2004-01-01

    One of the first third-generation synchrotron light sources, the ALS, has been operating for almost a decade at Berkeley Lab, where experimenters have been exploiting its high brightness for forefront science. However, accelerator and insertion-device technology have significantly changed since the ALS was designed. As a result, the performance of the ALS is in danger of being eclipsed by that of newer, more advanced sources. The ALS upgrade that we are planning includes full-energy, top-off injection with higher storage-ring current and the replacement of five first-generation insertion devices with nine state-of-the art insertion devices and four new application-specific beamlines now being identified in a strategic planning process. The upgrade will help keep the ALS at the forefront of soft x-ray synchrotron light sources for the next two decades

  18. Tumor type resulting in upgrade: An analysis based on 333 low grade soft tissue sarcoma

    Directory of Open Access Journals (Sweden)

    Langer, Stefan

    2014-11-01

    Full Text Available [english] Introduction: Soft tissue sarcomas (STS are rare tumors. Based on histopathological criteria, three grades are distinguished from low (G1 to intermediate (G2 and high grade (G3. After complete initial surgical resection, some G1 STS recur as lesions with an upgrade of a previous G1 STS to a recurrent G2 STS. This upgrade indicates higher malignancy of the STS. Our aim was to find possible risk factors for these upgrades including age, localization of tumor and tumor type. Methods: This retrospective case-control study evaluated 333 patients. Of these 333, 54.7% were male and 45.3% female. All patients underwent R0 resections and among these, 10% subsequently upgraded. The processed data include age, gender, tumor type, tumor localization, local recurrence and upgrade. Results: Patients with upgrades have a higher mean age of 5.5 years than our reference collective. The tumor type has a significant effect on upgrades. Patients with fibrosarcomas are at a threefold risk of an upgrade compared to patients with other G1 STS.Conclusion: Our results indicate that age and tumor type play a key role in upgrades in G1 STS. Patients, age 60 and above and diagnosed with G1 fibrosarcomas, are three times as likely to upgrade compared to patients younger than 60 with other G1 STS. We discuss the significance of these risk factors and whether aside from complete tumor resection, additional therapies (e.g. irradiation may be applied to improve therapeutic outcome.

  19. Nano-catalysts for upgrading bio-oil: Catalytic decarboxylation and hydrodeoxygenation

    Science.gov (United States)

    Uemura, Yoshimitsu; Tran, Nga T. T.; Naqvi, Salman Raza; Nishiyama, Norikazu

    2017-09-01

    Bio-oil is a mixture of oxygenated chemicals produced by fast pyrolysis of lignocellulose, and has attracted much attention recently because the raw material is renewable. Primarily, bio-oil can be used as a replacement of heavy oil. But it is not highly recommended due to bio-oil's inferior properties: high acidity and short shelf life. Upgrading of bio-oil is therefore one of the important technologies nowadays, and is categorized into the two: (A) decrarboxylation/decarbonylation by solid acid catalysts and (B) hydrodeoxygenation (HDO) by metallic catalysts. In our research group, decarboxylation of bio-oil by zeolites and HDO of guaiacol (a model compound of bio-oil) have been investigated. In this paper, recent developments of these upgrading reactions in our research group will be introduced.

  20. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    International Nuclear Information System (INIS)

    Dhalla, F.; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-01-01

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  1. The silicon vertex locator for the LHCb upgrade

    CERN Document Server

    Head, Tim

    2014-01-01

    The upgrade of the LHCb experiment, planned for 2018, will transform the entire readout to a triggerless system being read out at 40 MHz. The upgraded silicon vertex detector (VELO) must be light weight, radiation hard, and compatible with LHC vacuum requirements. It must be capable of fast pattern recognition, fast track reconstruction and high precision vertexing. This challenge is being met with a new VELO design based on hybrid pixel detectors positioned to within 5 mm of the LHC colliding beams. The detector will be shielded from the beam by a View the MathML source~300μm thick aluminium foil. Evaporative CO2 coolant circulating in micro-channels embedded in a thin silicon substrate will be used for cooling.

  2. LHCb PID Upgrade Technical Design Report

    CERN Document Server

    LHCb Collaboration

    2013-01-01

    The LHCb upgrade will take place in the second long shutdown of the LHC, currently scheduled to begin in 2018. The upgrade will enable the experiment to run at luminosities of $2 \\times 10^{33}cm^{-2}s^{-1}$ and will read out data at a rate of 40MHz into a exible software-based trigger. All sub-detectors of LHCb will be re-designed to comply with these new operating conditions. This Technical Design Report presents the upgrade plans of the Ring Imaging Cherenkov (RICH) system, the calorimeter system and the muon system, which together provide the particle identication capabilities of the experiment.

  3. Instrumentation and control upgrade evaluation methodology: Final report. Volume 2: Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Bliss, M.; Brown, E.; Florio, F.; Stofko, M.

    1996-07-01

    This workbook accompanies the methodology manual (EPRI TR-104963-V1) which describes how to develop an Upgrade Evaluation Report (UER). A UER is an evaluation that is performed by a nuclear power plant to decide the most cost-effective upgrade to perform (if any) for a previously identified Upgrade Candidate System. A UER defines the utility`s mission and objectives in regards to upgrade candidates, as well as the systems initial costs, benefits to each upgrade, and an initial upgrade schedule to cost-effectively implement system upgrades.

  4. Upgraded Readout Electronics for the ATLAS Liquid Argon Calorimeters at the High Luminosity LHC

    CERN Document Server

    Andeen, T; The ATLAS collaboration

    2012-01-01

    The ATLAS Liquid Argon (LAr) calorimeters produce a total of 182,486 signals which are digitized and processed by the front-end and back-end electronics at every triggered event. In addition, the front-end electronics is summing analog signals to provide coarsely grained energy sums, called trigger towers, to the first-level trigger system, which is optimized for nominal LHC luminosities. However, the pile-up noise expected during the High Luminosity phases of LHC will be increased by factors of 3 to 7. An improved spatial granularity of the trigger primitives is therefore proposed in order to improve the identification performance for trigger signatures, like electrons or photons, at high background ejection rates. For the first upgrade phase cite{pahse1loi} in 2018, new LAr Trigger Digitizer Boards (LTDB) are being designed to receive higher granularity signals, digitize them on detector and send them via fast optical links to a new digital processing system (DPS). The DPS applies a digital filtering and id...

  5. Upgrading nuclear safety and security infrastructure in Yemen

    International Nuclear Information System (INIS)

    Bahran, M.Y.

    2007-01-01

    In 1999 the National Atomic Energy Commission of the Republic of Yemen was established with an emphasis on building Radiation Protection Infrastructure suitable for Yemen and in accordance with international standards. Since then, Yemen arguably has built one of the best such systems in the region if not in the world with respect to the country's needs. This system is going to be upgraded from Radiological Safety and Security system to a Nuclear Safety and Security system. This is to be done as a prerequisite to any further development in the Peaceful Applications of Nuclear Energy, particularly Nuclear Power and Desalination. (author)

  6. Low-grade coals: a review of some prospective upgrading technologies

    Energy Technology Data Exchange (ETDEWEB)

    Hassan Katalambula; Rajender Gupta [University of Alberta, Edmonton, AB (Canada). Department of Chemical and Materials Engineering

    2009-07-15

    There is a growing need of using low-grade coals because of higher quest for power generation. In the present carbon-constrained environment, there is a need of upgrading these coals in terms of moisture, ash, and/or other trace elements. The current paper reviews technologies used mainly categorized as drying for reducing moisture and cleaning the coal for reducing mineral content of coal and related harmful constituents, such as sulfur and mercury. The earliest upgrading of high-moisture lignite involved drying and manufacturing of briquettes. Drying technologies consist of both evaporative and non-evaporative (dewatering) types. The conventional coal cleaning used density separation in water medium. However, with water being a very important resource, conservation of water is pushing toward the development of dry cleaning of coal. There are also highly advanced coal-cleaning technologies that produce ultra-clean coals and produce coals with less than 0.1% of ash. The paper discusses some of the promising upgrading technologies aimed at improving these coals in terms of their moisture, ash, and other pollutant components. It also attempts to present the current status of the technologies in terms of development toward commercialization and highlights on problems encountered. It is obvious that still the upgrading goal has not been realized adequately. It can therefore be concluded that, because reserves for low-grade coals are quite plentiful, it is important to intensify efforts that will make these coals usable in an acceptable manner in terms of energy efficiency and environmental protection. 68 refs., 7 figs.

  7. Turbulence in high-beta ASDEX upgrade advanced scenarios

    Science.gov (United States)

    Doerk, H.; Bock, A.; Di Siena, A.; Fable, E.; Görler, T.; Jenko, F.; Stober, J.; The ASDEX Upgrade Team

    2018-01-01

    Recent experiments at ASDEX Upgrade achieve non-inductive operation in full tungsten wall conditions by applying electron cyclotron and neutral beam current drive. These discharges are characterised by a well-measured safety factor profile, which does not drop below one, and a good energy confinement. By reproducing the experimental heat fluxes, nonlinear gyrokinetic simulations suggest that the observed strong peaking of the ion temperature in the core is caused by the stabilising impact of a significant beam ion content, as well as strong electromagnetic effects on turbulent transport. Quasilinear transport models are not yet applicable in this interesting and reactor relevant parameter regime, but available simulation data may serve as a testbed for improvements. As the present plasma is close to the kinetic ballooning (KBM) threshold, elevating the safety factor profile under otherwise identical conditions is proposed to clarify, whether profiles are ultimately limited by KBM turbulence, or by global stability constraints.

  8. Enzymatic pulp upgrade for producing high-value cellulose out of a Kraft paper pulp.

    Science.gov (United States)

    Hutterer, Christian; Kliba, Gerhard; Punz, Manuel; Fackler, Karin; Potthast, Antje

    2017-07-01

    The high-yield separation of polymeric parts from wood-derived lignocellulosic material is indispensable in biorefinery concepts. For the separation of cellulose and xylan from hardwood paper pulps to obtain pulps of high cellulose contents, simple alkaline extractions were found to be the most suitable technology, although having certain limitations. These are embodied by residual alkali resistant xylan incorporated in the pulp matrix. Further purification in order to produce pure cellulose with a low uniformity could be achieved selectively degrading residual xylan and depolymerizing the cellulose macromolecules by xylanase and cellulase. The latter help to adjust cellulose chain lengths for certain dissolving pulp grades while reducing the demand for ozone in subsequent TCF bleaching. Experiments applying different commercially available enzyme preparations revealed the dependency of xylanase performance on the residual xylan content in pulps being stimulated by additional cellulase usage. The action of the latter strongly depends on the cellulose allomorphy confirming the impact of the pulp morphology. Hence, the combined application of both types of enzymes offers a high potential for upgrading pulps in order to produce a pure and high-value cellulose product. Copyright © 2017 Elsevier Inc. All rights reserved.

  9. The Jlab Upgrade - Nucleon Studies with CLAS12

    International Nuclear Information System (INIS)

    Volker Burkert

    2007-01-01

    An overview is presented on the program to study the nucleon structure at the 12 GeV Jlab Upgrade using the CLAS12 detector. The focus is on deeply virtual exclusive processes to access the generalized parton distributions, semi-inclusive processes to study transveresx momentum-dependent distributions functions, and inclusive spin structure functions and resonance transition form factors at high Q 2 and with high precision

  10. Innovative process for biogas upgrading with CO2 storage: Results from pilot plant operation

    International Nuclear Information System (INIS)

    Baciocchi, Renato; Carnevale, Ennio; Corti, Andrea; Costa, Giulia; Lombardi, Lidia; Olivieri, Tommaso; Zanchi, Laura; Zingaretti, Daniela

    2013-01-01

    An innovative biogas upgrading method that, differs from the currently employed commercial techniques, allows also to capture and store the separated CO 2 is investigated. This process, named Alkali absorption with Regeneration (AwR), consists in a first step in which CO 2 is separated from the biogas by chemical absorption with an alkali aqueous solution followed by a second step in which the spent absorption solution is regenerated for reuse in the first step of the upgrading process and the captured CO 2 is stored in a solid and thermodynamically stable form. The latter process is carried out contacting the spent absorption solution, rich in carbonate and bicarbonate ions, with a waste material – air pollution control (APC) residues from Waste-to-Energy plants – characterized by a high content of calcium hydroxide and leads to the precipitation of calcium carbonate and to the regeneration of the alkali hydroxide content of the solution. The process was tested in a specifically designed pilot plant fed with 20 m 3 h −1 (gas at standard conditions of 273 K and 1001 kPa) of landfill gas. Results showed that a high CH 4 content in the outlet gas can be obtained using a 3.8 mol L −1 NaOH aqueous solution with a solution/landfill gas ratio of about 9 L m −3 (gas at standard conditions of 273 K and 1001 kPa). The regeneration process proved to be feasible, but its efficiency was limited by several factors to maximum values in the range of 50–60 %, showing to decrease with higher NaOH concentrations in the absorption solution. Absorption tests with regenerated load solutions after appropriate NaOH makeup, did not show appreciable differences with respect to raw solutions

  11. Puzzling patterns in neighborhood change: upgrading and downgrading in highly regulated urban housing markets

    NARCIS (Netherlands)

    Teernstra, A.B.; van Gent, W.P.C.

    2012-01-01

    This study disentangles the relationship between income and real estate value development in Dutch urban neighborhoods. Within the literature on upgrading and downgrading, it is often assumed that neighborhood income and real estate value development are strongly linked. The results reported

  12. DIII-D UPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    STAMBAUGH, RD

    2003-01-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program

  13. Upgrading low-boiling-fraction fast pyrolysis bio-oil using supercritical alcohol: Understanding alcohol participation, chemical composition, and energy efficiency

    International Nuclear Information System (INIS)

    Jo, Heuntae; Prajitno, Hermawan; Zeb, Hassan; Kim, Jaehoon

    2017-01-01

    Highlights: • Non-catalytic and non-hydrogen based bio-oil upgrading was conducted using scMeOH. • 16–40 wt% alcohols were consumed during the upgrading. • High bio-oil yield of 78.4 wt% and low TAN of 4.0 mg KOH/g were achieved. • Effect of supercritical alcohols, reaction times, temperature and bio-oil concentration was conducted. • scMeOH upgrading has good energy recovery (ER) and energy efficiency (EE) compared with scEtOH and scIPA. - Abstract: Herein, a supercritical methanol (scMeOH) route for efficient upgrading of the low-boiling fraction of fast pyrolysis bio-oil containing a large amount of low-molecular-weight acids and water was investigated. The effects of various reaction parameters, including the temperature, concentration, and time, were explored. The yield of bio-oil and the energy efficiency of the scMeOH upgrading process were determined based on the amount of methanol that participated in the reaction during upgrading and fractionation of the upgraded heavy-fraction bio-oils (UHBOs) and upgraded light-fraction bio-oils (ULBOs). Upgrading at 400 °C with 9.1 wt% bio-oil for 30 min generated a high bio-oil yield of 78.4 wt% with a low total acid number (TAN) of 4.0 mg-KOH/g-oil and a higher heating value of 29.9 MJ kg −1 . The energy recovery (ER) was 94–131% and the energy efficiency (EE) was in the range of 79–109% depending on the calorific values of the ULBOs. Compared with upgrading in supercritical ethanol and supercritical isopropanol, less alcohol participation, a lower TAN, and higher ER and EE were achieved with scMeOH upgrading. Plausible pathways for bio-oil upgrading in supercritical alcohols based on detailed compositional analysis of the UHBO, ULBO, and gaseous products were discussed.

  14. ATLAS Tile Calorimeter Upgrades for HL-LHC

    CERN Document Server

    Angelidakis, Stylianos; The ATLAS collaboration

    2018-01-01

    The High-Luminosity phase of the Large Hadron Collider (LHC) at CERN is expected to begin in 2026, delivering a luminosity of ~5×10^34 cm −2 s −1 , with up to 200 interactions per 25 ns bunch crossing. In order to cope with the expected high trigger rates and intense radiation conditions, the ATLAS Tile Calorimeter will be upgraded with readout architectures that will allow to maintain an optimal performance in its future operation.

  15. A fundamental research for upgrading heavy oil using syngas as hydrogen source

    Energy Technology Data Exchange (ETDEWEB)

    Yan, D.; Yuan, M.; Sun, X.; Zhao, S. [China Univ. of Petroleum, Beijing (China). State Key Laboratory of Heavy Oil Processing

    2006-07-01

    The stock of heavy oil and residue from petroleum fractions has become more important as a component in supplying demands for fuel and petrochemical feeds. Finding economical means of upgrading heavy oils is extremely important in order to ensure future fuel supply. A number of new technologies for upgrading heavy oils have been evaluated, including residual fluid catalytic cracking (RFCC), hydrogenation, thermal conversion, and solvent deasphalting. However, the commercial application of such technologies is mainly constrained by the metal and residual carbon concentrations that are present in all heavy oils. Conventional technologies used to upgrade vacuum residue (VR) result in heavy coke formation, with a consequential reduction in the life of expensive, high-performance catalysts. The hydro upgrading process can significantly remove the concentration of heteroatom such as sulfur, nitrogen, and metals in the liquid products. This paper investigated upgrading of heavy oil using syngas as an alternative hydrogen source with a dispersed catalyst. The paper discussed the experiment with reference to the feedstock and catalyst precursors; finely dispersed catalysts preparation; experimental apparatus; experimental design and procedure; and analysis. The results were presented in terms of effects of catalyst dispersion; effect of hydro-upgrading heavy oil using syngas as alternative source; and effects of different catalysts on residue hydrocracking. Last, the paper discussed the properties of the hydrocracked oil treated with syngas. The study confirmed the effectiveness of the slurry bed hydrocracking catalyst using syngas as a hydrogen source. 23 refs., 8 tabs., 16 figs.

  16. A Review of Laboratory-Scale Research on Upgrading Heavy Oil in Supercritical Water

    Directory of Open Access Journals (Sweden)

    Ning Li

    2015-08-01

    Full Text Available With the growing demand for energy and the depletion of conventional crude oil, heavy oil in huge reserve has attracted extensive attention. However, heavy oil cannot be directly refined by existing processes unless they are upgraded due to its complex composition and high concentration of heteroatoms (N, S, Ni, V, etc.. Of the variety of techniques for heavy oil upgrading, supercritical water (SCW is gaining popularity because of its excellent ability to convert heavy oil into valued, clean light oil by the suppression of coke formation and the removal of heteroatoms. Based on the current status of this research around the world, heavy oil upgrading in SCW is summarized from three aspects: Transformation of hydrocarbons, suppression of coke, and removal of heteroatoms. In this work, the challenge and future development of the orientation of upgrading heavy oil in SCW are pointed out.

  17. Operation status and upgrading of HIRFL

    International Nuclear Information System (INIS)

    Tang, J.Y.; Wang, Y.F.; Wei, B.W.

    2001-01-01

    The operation status and the undergoing upgrading at HIRFL machine are presented. The accelerated ion species with the machine have been expanding, including metallic ions and higher energy with the new ECR ion source. The upgrading of HIRFL as the pre-accelerator of CSR storage ring has been processing steadily. The new 14.5 GHz ECR ion source has been put in operation in early 1999. A full-superconducting ECR ion source of 18 GHz is under design. The manufacture of the new vacuum chamber for SFC is just finished and the installation is to be started. The construction of the new B1 buncher is nearly to be finished, and the off-line test and the installation will be started soon. Another two identical bunchers will be ordered after the test. The beam distribution system is under upgrading to make all experiment stations separate from the others and the time-sharing mode possible, and a new cancer-therapy station is also under construction. The other upgrading items include the yoke enlarging of SFC, beam diagnostics, computer control and beam distribution system

  18. EBR-II Cover Gas Cleanup System (CGCS) upgrade graphical interface design

    International Nuclear Information System (INIS)

    Staffon, J.D.; Peters, G.G.

    1992-01-01

    Technology advances in the past few years have prompted an effort at Argonne National Laboratory to replace existing equipment with high performance digital computers and color graphic displays. Improved operation of process systems can be achieved by utilizing state-of-the-art computer technology in the areas of process control and process monitoring. The Cover Gas Cleanup System (CGCS) at EBR-II is the first system to be upgraded with high performance digital equipment. The upgrade consisted of a main control computer, a distributed control computer, a front end input/output computer, a main graphics interface terminal, and a remote graphics interface terminal. This paper describes the main control computer and the operator interface control software

  19. Upgrade of VR-1 training reactor I and C

    International Nuclear Information System (INIS)

    Kropik, M.; Matejka, K.; Chab, V.

    2003-01-01

    The contribution describes the upgrade of the VR-1 training reactor I and C (Instrumentation and Control). The reactor was put into operation in the 1990, and its I and C seems to be obsolete now. The new I and C utilises the same digital technology as the old one. The upgrade has been done gradually during holidays in order not to disturb the reactor utilisation during teaching and training. The first stage consisted in the human-machine interface and the control room upgrade in 2001. A new operator's desk, displays, indicators and buttons were installed. Completely new software and communication interface to the present I and C were developed. During the second stage in 2002, new control rod drivers and safety circuits were installed. The rod motors were replaced and necessary mechanical changes on the control rod mechanism, induced by the utilisation of the new motor, were done. The new safety circuits utilise high quality relays with forced contacts to guarantee high reliability of their operation. The third stage, the control system upgrade is being carried out now. The new control system is based on an industrial PC mounted in a 19 inch crate. The operating system of the PC is the Microsoft Windows XP with the real time support RTX of the VentureCom Company. A large amount of work has been devoted to the software requirements to specify all dependencies, modes and permitted actions, safety measures, etc. The Department took an active part in the setting of software requirements and later in verification and validation of the software and the whole control system. Finally, a new protection system consisting of power measuring and power protection channels will be installed in 2004 or 2005. (author)

  20. Development of Muon Drift-Tube Detectors for High-Luminosity Upgrades of the Large Hadron Collider

    CERN Document Server

    Bittner, B; Kortner, O.; Kroha, H.; Legger, F.; Richter, R.; Biebel, O.; Engl, A.; Hertenberger, R.; Rauscher, F.

    2016-01-01

    The muon detectors of the experiments at the Large Hadron Collider (LHC) have to cope with unprecedentedly high neutron and gamma ray background rates. In the forward regions of the muon spectrometer of the ATLAS detector, for instance, counting rates of 1.7 kHz/square cm are reached at the LHC design luminosity. For high-luminosity upgrades of the LHC, up to 10 times higher background rates are expected which require replacement of the muon chambers in the critical detector regions. Tests at the CERN Gamma Irradiation Facility showed that drift-tube detectors with 15 mm diameter aluminum tubes operated with Ar:CO2 (93:7) gas at 3 bar and a maximum drift time of about 200 ns provide e?cient and high-resolution muon tracking up to the highest expected rates. For 15 mm tube diameter, space charge e?ects deteriorating the spatial resolution at high rates are strongly suppressed. The sense wires have to be positioned in the chamber with an accuracy of better than 50 ?micons in order to achieve the desired spatial...

  1. Upgrade of the ATLAS Hadronic Tile Calorimeter for the High Luminosity LHC

    Directory of Open Access Journals (Sweden)

    Tortajada Ignacio Asensi

    2018-01-01

    Three different front-end options are presently being investigated for the upgrade, two of them based on ASICs, and a final solution will be chosen after extensive laboratory and test beam studies that are in progress. A hybrid demonstrator module is being developed using the new electronics while conserving compatibility with the current system. The status of the developments will be presented, including results from the several tests with particle beams.

  2. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  3. Biological biogas upgrading capacity of a hydrogenotrophic community in a trickle-bed reactor

    International Nuclear Information System (INIS)

    Rachbauer, Lydia; Voitl, Gregor; Bochmann, Günther; Fuchs, Werner

    2016-01-01

    Highlights: • Data on long term operation of a system supplied with real biogas are presented. • Ex-situ biological methanation is feasible for biogas upgrading. • Gas quality obtained complies with strictest direct grid injection criteria. • Biomethane can act as flexible storage for renewable surplus electricity. - Abstract: The current study reports on biological biogas upgrading by means of hydrogen addition to obtain biomethane. A mesophilic (37 °C) 0.058 m"3 trickle-bed reactor with an immobilized hydrogenotrophic enrichment culture was operated for a period of 8 months using a substrate mix of molecular hydrogen (H_2) and biogas (36–42% CO_2). Complete CO_2 conversion (> 96%) was achieved up to a H_2 loading rate of 6.5 m_n"3 H_2/m"3_r_e_a_c_t_o_r _v_o_l_. × d, corresponding to 2.3 h gas retention time. The optimum H_2/CO_2 ratio was determined to be between 3.67 and 4.15. CH_4 concentrations above 96% were achieved with less than 0.1% residual H_2. This gas quality complies even with tightest standards for grid injection without the need for additional CO_2 removal. If less rigid standards must be fulfilled H_2 loading rates can be almost doubled (10.95 versus 6.5 m_n"3 H_2/m"3_r_e_a_c_t_o_r _v_o_l_. × d) making the process even more attractive. At this H_2 loading the achieved methane productivity was 2.52 m_n"3 CH_4/m"3_r_e_a_c_t_o_r _v_o_l_. × d. In terms of biogas this corresponds to an upgrading capacity of 6.9 m_n"3 biogas/m"3_r_e_a_c_t_o_r _v_o_l_. × d. The conducted experiments demonstrate that biological methanation in an external reactor is well feasible for biogas upgrading under the prerequisite that an adequate H_2 source is available.

  4. Silicon Tracking Upgrade at CDF

    International Nuclear Information System (INIS)

    Kruse, M.C.

    1998-04-01

    The Collider Detector at Fermilab (CDF) is scheduled to begin recording data from Run II of the Fermilab Tevatron in early 2000. The silicon tracking upgrade constitutes both the upgrade to the CDF silicon vertex detector (SVX II) and the new Intermediate Silicon Layers (ISL) located at radii just beyond the SVX II. Here we review the design and prototyping of all aspects of these detectors including mechanical design, data acquisition, and a trigger based on silicon tracking

  5. The enhanced ASDEX Upgrade pellet centrifuge launcher

    International Nuclear Information System (INIS)

    Plöckl, B.; Lang, P. T.

    2013-01-01

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios

  6. The enhanced ASDEX Upgrade pellet centrifuge launcher

    Energy Technology Data Exchange (ETDEWEB)

    Plöckl, B.; Lang, P. T. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-10-15

    Pellets played an important role in the program of ASDEX Upgrade serving both for investigations on efficient particle fuelling and high density scenarios but also for pioneering work on Edge Localised Mode (ELM) pacing and mitigation. Initially designed for launching fuelling pellets from the magnetic low field side, the system was converted already some time ago to inject pellets from the magnetic high field side as much higher fuelling efficiency was found using this configuration. In operation for more than 20 years, the pellet launching system had to undergo a major revision and upgrading, in particular of its control system. Furthermore, the control system installed adjacent to the launcher had to be transferred to a more distant location enforcing a complete galvanic separation from torus potential and a fully remote control solution. Changing from a hybrid system consisting of PLC S5/S7 and some hard wired relay control to a state of the art PLC system allowed the introduction of several new operational options enabling more flexibility in the pellet experiments. This article describes the new system architecture of control hardware and software, the operating procedure, and the extended operational window. First successful applications for ELM pacing and triggering studies are presented as well as utilization for the development of high density scenarios.

  7. Events as spaces for upgrading : Automotive events in Shanghai

    NARCIS (Netherlands)

    E. van Tuijl (Erwin); K. Dittrich (Koen)

    2015-01-01

    textabstractThis study contributes to the literature dealing with upgrading of the Chinese automotive industry by analysing the role of events in the upgrading process. By combining literature on temporary clusters with that of knowledge sourcing and upgrading, we investigate how firms use events

  8. Experimental studies of high-confinement mode plasma response to non-axisymmetric magnetic perturbations in ASDEX Upgrade

    Science.gov (United States)

    Suttrop, W.; Kirk, A.; Nazikian, R.; Leuthold, N.; Strumberger, E.; Willensdorfer, M.; Cavedon, M.; Dunne, M.; Fischer, R.; Fietz, S.; Fuchs, J. C.; Liu, Y. Q.; McDermott, R. M.; Orain, F.; Ryan, D. A.; Viezzer, E.; The ASDEX Upgrade Team; The DIII-D Team; The Eurofusion MST1 Team

    2017-01-01

    The interaction of externally applied small non-axisymmetric magnetic perturbations (MP) with tokamak high-confinement mode (H-mode) plasmas is reviewed and illustrated by recent experiments in ASDEX Upgrade. The plasma response to the vacuum MP field is amplified by stable ideal kink modes with low toroidal mode number n driven by the H-mode edge pressure gradient (and associated bootstrap current) which is experimentally evidenced by an observable shift of the poloidal mode number m away from field alignment (m  =  qn, with q being the safety factor) at the response maximum. A torque scan experiment demonstrates the importance of the perpendicular electron flow for shielding of the resonant magnetic perturbation, as expected from a two-fluid MHD picture. Two significant effects of MP occur in H-mode plasmas at low pedestal collisionality, ν \\text{ped}\\ast≤slant 0.4 : (a) a reduction of the global plasma density by up to 61 % and (b) a reduction of the energy loss associated with edge localised modes (ELMs) by a factor of up to 9. A comprehensive database of ELM mitigation pulses at low {ν\\ast} in ASDEX Upgrade shows that the degree of ELM mitigation correlates with the reduction of pedestal pressure which in turn is limited and defined by the onset of ELMs, i. e. a modification of the ELM stability limit by the magnetic perturbation.

  9. Cost evaluation of I and C upgrade approach in nuclear power plants

    International Nuclear Information System (INIS)

    Kang, Hyun-Tae; Lee, Jae-Ki

    2013-01-01

    Highlights: • Cost evaluation process for I and C system upgrade is built. • 4 cost factors affecting I and C system upgrade are described. • Additional cost incurred by a phased upgrade is calculated. • Cost for system upgrade between upgrade implementations is compared. - Abstract: Utilities have recently been debating the respective pros and cons of implementation of a multi-phase upgrade during several normal outages versus a single major upgrade implementation during a prolonged outage. We have studied these approaches and have been developing the basic design of nuclear power plants (NPPs) instrumentation and control (I and C) upgrade since early 2008. As part of this study, analyses of the NPPs I and C systems were conducted and the need for upgrading the systems was raised. One of the primary concerns regarding the system upgrade is a cost-benefit implementation, which will influence the upgrade approach. From this viewpoint, the I and C upgrade must consider economic factors such as I and C vendor cost, architecture engineering cost, installation cost, utility cost, and other transition costs such as training and procedure development. This paper presents a comparison study of economical aspects including cost evaluation between the aforementioned upgrade implementations and suggests a solution for I and C upgrade approach

  10. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016 and 2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  11. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    Science.gov (United States)

    Bilki, B.; Onel, Y.

    2018-03-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I Upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  12. Bohunice V1 NPP upgrading programme

    International Nuclear Information System (INIS)

    Kerak, J.

    2001-01-01

    The paper describes whole process of Bohunice V1 NPP nuclear safety and operational reliability level increase which has been performed since units commissioning (1. unit in 1978, 2. unit in 1980), continued Small Reconstruction (1991 -1993) and finished Gradual Upgrading(1994 -2000). The main purpose is to last stage -Gradual upgrading of Bohunice V1 NPP. (author)

  13. Test beam results of the GE1/1 prototype for a future upgrade of the CMS high-$\\eta$ muon system

    CERN Document Server

    Abbaneo, D; Armagnaud, C; Aspell, P; Ban, Y; Bally, S; Benussi, L; Berzano, U; Bianco, S; Bos, J; Bunkowski, K; Cai, J; Chatelain, J P; Christiansen, J; Colafranceschi, S; Colaleo, A; Conde Garcia, A; David, E; de Robertis, G; De Oliveira, R; Duarte Pinto, S; Ferry, S; Formenti, F; Franconi, L; Gnanvo, K; Gutierrez, A; Hohlmann, M; Karchin, P E; Loddo, F; Magazzú, G; Maggi, M; Marchioro, A; Marinov, A; Mehta, K; Merlin, J; Mohapatra, A; Moulik, T; Nemallapudi, M V; Nuzzo, S; Oliveri, E; Piccolo, D; Postema, H; Raffone, G; Rodrigues, A; Ropelewski, L; Saviano, G; Sharma, A; Staib, M J; Teng, H; Tytgat, M; Tupputi, S A; Turini, N; Smilkjovic, N; Villa, M; Zaganidis, N; Zientek, M

    2011-01-01

    Gas Electron Multipliers (GEM) are an interesting technology under consideration for the future upgrade of the forward region of the CMS muon system, specifically in the $1.6<| \\eta |<2.4$ endcap region. With a sufficiently fine segmentation GEMs can provide precision tracking as well as fast trigger information. The main objective is to contribute to the improvement of the CMS muon trigger. The construction of large-area GEM detectors is challenging both from the technological and production aspects. In view of the CMS upgrade we have designed and built the largest full-size Triple-GEM muon detector, which is able to meet the stringent requirements given the hostile environment at the high-luminosity LHC. Measurements were performed during several test beam campaigns at the CERN SPS in 2010 and 2011. The main issues under study are efficiency, spatial resolution and timing performance with different inter-electrode gap configurations and gas mixtures. In this paper results of the performance of the pro...

  14. The Phase-2 ATLAS ITk Pixel Upgrade

    CERN Document Server

    Rossi, Leonardo Paolo; The ATLAS collaboration

    2018-01-01

    The upgrade of the ATLAS experiment for the operation at the High Luminosity Large Hadron Collider requires a new and more performant inner tracker, the ITk. The innermost part of this tracker will be built using silicon pixel detectors. This paper describes the ITk pixel project, which, after few years of design and test e ort, is now defined in detail.

  15. LEP is upgraded

    CERN Multimedia

    1995-01-01

    A superconducting radio-frequency cavity is installed on the Large Electron-Positron (LEP) collider. This upgrade, known as LEP-2, allowed the accelerator to reach new, higher energies and so investigate new areas of physics.

  16. Characterization of impurities in biogas before and after upgrading to vehicle fuel

    Energy Technology Data Exchange (ETDEWEB)

    Arrhenius, Karine; Johansson, Ulrika [SP Technical Research Institute of Sweden, Boraas (Sweden)

    2012-01-15

    impurities are (at more than 95 %) removed during the drying step and impurities reach the condensate water. Water scrubbers are used in parallel with two other upgrading techniques (amine scrubber and PSA) in two of the test plants. I both case, the gas upgraded by the water scrubber contains more impurities than the gas upgraded with the other techniques. 20 to 30 % of the impurities remain in the gas upgraded with water scrubber while a maximum of 10 % of the impurities remain in the gas upgraded by the other techniques. The two PSA plants which have been studied show good effects on removing the impurities (more than 98 % is removed). To evaluate the purity of the upgraded and dried biogases that have been tested in this study, we have studied if these gases fulfill the requirements of the Swedish standard SS 15 54 38 'requirements for biogas used as vehicle fuel'. The standard has requirements regarding the main compounds, nitrogen containing compounds inclusive ammonia, sulfur containing compounds inclusive hydrogen sulphide. All but one of the analysed gases fulfills the requirements for the main compounds. All the gases fulfill the requirements for the nitrogen containing compounds and the sulfur containing compounds. Regarding other impurities, there is today no requirement or guidelines even if discussions are going on in order to define requirements for siloxanes and halogenated compounds, in Sweden and in Europe. These compounds are suspected to possibly cause damages in gas vehicles. As a consequence, there is no information regarding a possible influence of other compounds identified in this study (as example terpenes, hydrocarbons, ketones) on causing damage to gas vehicles. The presence of amines at significant concentrations has been observed in some gases that have been upgraded in amines scrubber. Under which conditions this happens should be studied in a following work.

  17. Habitat Demonstration Unit Medical Operations Workstation Upgrades

    Science.gov (United States)

    Trageser, Katherine H.

    2011-01-01

    This paper provides an overview of the design and fabrication associated with upgrades for the Medical Operations Workstation in the Habitat Demonstration Unit. The work spanned a ten week period. The upgrades will be used during the 2011 Desert Research and Technology Studies (Desert RATS) field campaign. Upgrades include a deployable privacy curtain system, a deployable tray table, an easily accessible biological waste container, reorganization and labeling of the medical supplies, and installation of a retractable camera. All of the items were completed within the ten week period.

  18. Get a winning Oracle upgrade session using the quarterback approach

    Science.gov (United States)

    Anderson, G.

    2002-01-01

    Upgrades, upgrades... too much customer down time. Find out how we shrunk our production upgrade schedule 40% from our estimate of 10 days 12 hours to 6 days 2 hours using the quarterback approach. So your upgrade is not that complex, come anyway. This approach is scalable to any size project and will be extremely valuable.

  19. The 12 GeV Upgrade at Jefferson Lab

    International Nuclear Information System (INIS)

    Rolf Ent

    2002-01-01

    There has been a remarkable fruitful evolution of our picture of the behavior of strongly interacting matter during the almost two decades that have passed since the parameters of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab were defined. These advances have revealed important new experimental questions best addressed by a CEBAF-class machine at higher energy. Fortunately, favorable technical developments coupled with foresight in the design of the facility make it feasible to triple (double) CEBAF's design (achieved) beam energy from 4 (6) GeV to 12 GeV, in a cost-effective manner: the Upgrade can be realized for about 15% of the cost of the initial facility. This Upgrade would enable the worldwide community to greatly expand its physics horizons. In addition to in general improving the figure of merit and momentum transfer range of the present Jefferson Lab physics program, raising the energy of the accelerator to 12 GeV opens up two main new areas of physics: (1) It allows direct exploration of the quark-gluon structure of hadrons and nuclei in the ''valence quark region''. It is known that inclusive electron scattering at the high momentum and energy transfers available at 12 GeV is governed by elementary interactions with quarks and, indirectly, gluons. The original CEBAF energy is not adequate to study this critical region, while with continuous 12 GeV beams one can cleanly access the entire ''valence quark region'' and exploit the newly discovered Generalized Parton Distributions. In addition, a 12-GeV Jefferson Lab can essentially complete the studies of the transition from hadronic to quark-gluon degrees of freedom. (2) It allows crossing the threshold above which the origins of quark confinement can be investigated. Specifically, 12 GeV will enable the production of certain ''exotic'' mesons. Whereas in the QCD region of asymptotic freedom ample evidence for the role of gluons exist through the observation of gluon jets

  20. Slum upgrading in developing countries: lessons from Ghana and ...

    African Journals Online (AJOL)

    The paper identifies common elements in the upgrading programmes in the literature. It assesses two slum upgrading projects from Ghana and Kenya to determine how the elements were factored into the projects' implementation. The article concludes that stakeholders involved in slum upgrading in Africa should consider ...

  1. Hardware and software maintenance strategies for upgrading vintage computers

    International Nuclear Information System (INIS)

    Wang, B.C.; Buijs, W.J.; Banting, R.D.

    1992-01-01

    The paper focuses on the maintenance of the computer hardware and software for digital control computers (DCC). Specific design and problems related to various maintenance strategies are reviewed. A foundation was required for a reliable computer maintenance and upgrading program to provide operation of the DCC with high availability and reliability for 40 years. This involved a carefully planned and executed maintenance and upgrading program, involving complementary hardware and software strategies. The computer system was designed on a modular basis, with large sections easily replaceable, to facilitate maintenance and improve availability of the system. Advances in computer hardware have made it possible to replace DCC peripheral devices with reliable, inexpensive, and widely available components from PC-based systems (PC = personal computer). By providing a high speed link from the DCC to a PC, it is now possible to use many commercial software packages to process data from the plant. 1 fig

  2. The LHCb VELO upgrade

    International Nuclear Information System (INIS)

    Rodríguez Pérez, Pablo

    2013-01-01

    LHCb is a forward spectrometer experiment dedicated to the study of new physics in the decays of beauty and charm hadrons produced in proton collisions at the Large Hadron Collider (LHC) at CERN. The VErtex LOcator (VELO) is the microstrip silicon detector surrounding the interaction point, providing tracking and vertexing measurements. The upgrade of the LHCb experiment, planned for 2018, will increase the luminosity up to 2×10 33 cm −2 s −1 and will perform the readout as a trigger-less system with an event rate of 40 MHz. Extremely non-uniform radiation doses will reach up to 5×10 15 1 MeV n eq /cm 2 in the innermost regions of the VELO sensors, and the output data bandwidth will be increased by a factor of 40. An upgraded detector is under development based in a pixel sensor of the Timepix/Medipix family, with 55×55μm 2 pixels. In addition a microstrip solution with finer pitch, higher granularity and thinner than the current detector is being developed in parallel. The current status of the VELO upgrade program will be described together with recent testbeam results

  3. Qinshan 300Mwe NPP full scope simulator upgrade

    International Nuclear Information System (INIS)

    Qi Kelin; Li Qing; Liu Wei, Lai Shengyuan

    2006-01-01

    On April 28,2004, RINPO was awarded the project for Qinshan 300Mwe NPP full scope simulator upgrade, the SAT (site acceptance test) was completed on June 30 2005 and the simulator put into operator training again. Scope of upgrade includes: computer system (DGI server and workstations) all replaced by microcomputers; G2 I/O controllers all replaced by RTP EIOBC; Unix-based simulation support environment replaced by RINPO's PC-based simulation environment RINSIMTM, Instructor software replaced by RINPO's PC-based instructor software with function and diagram redesigned; DEH, Feed-water control and some other digital control systems redeveloped to follow NPP modifications; desk-top simulator with soft panel control room developed as byproduct; most of the models not changed but it is planned the reactor core and PPC model will be upgraded in near future. SAT of upgrade demonstrates that the performance of the simulator much improved after the upgrade. (author)

  4. Coal upgrading

    Energy Technology Data Exchange (ETDEWEB)

    Nunes, S. [IEA Clean Coal Centre, London (United Kingdom)

    2009-10-15

    This report examines current technologies and those likely to be used to produce cleaner coal and coal products, principally for use in power generation and metallurgical applications. Consideration is also given to coal production in the leading coal producing countries, both with developed and developing industries. A range of technologies are considered. These include the coal-based liquid fuel called coal water mixture (CWM) that may compete with diesel, the production of ultra-clean coal (UCC) and coal liquefaction which competes with oil and its products. Technologies for upgrading coal are considered, especially for low rank coals (LRC), since these have the potential to fill the gap generated by the increasing demand for coal that cannot be met by higher quality coals. Potential advantages and downsides of coal upgrading are outlined. Taking into account the environmental benefits of reduced pollution achieved through cleaner coal and reduced transport costs, as well as other positive aspects such as a predictable product leading to better boiler design, the advantages appear to be significant. The drying of low rank coals improves the energy productively released during combustion and may also be used as an adjunct or as part of other coal processing procedures. Coal washing technologies vary in different countries and the implications of this are outlined. Dry separation technologies, such as dry jigging and electrostatic separation, are also described. The demonstration of new technologies is key to their further development and demonstrations of various clean coal technologies are considered. A number of approaches to briquetting and pelletising are available and their use varies from country to country. Finally, developments in upgrading low rank coals are described in the leading coal producing countries. This is an area that is developing rapidly and in which there are significant corporate and state players. 81 refs., 32 figs., 3 tabs.

  5. Upgrade of of monitoring devices for radiation information

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jung Taek; Park, Won Man; Kim, Jung Soo; Lee, Bong Jae; Jae Yoo Kyung

    1999-01-01

    The Radiation Monitoring System (RMS) in Hanaro of KAERI and NPPs of Korea, supplied by victoreen, sometimes has been stopped to use slow 486 PC (Personal computer) and not to be enough memory in main processing computer, IOCA and IOCB, for signal processing and storing. It is very difficult for operator to operate and maintain RMS, because of using an unfamiliar operating system, SCO Unix, of main computer. And also, ScanRad (TM) program for processing and storing radiation signal has Y2K problems and is able to lose and not to display measuring signals. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing operating System to Window NT-based system. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing Operating System to Window NT-based system. Therefore a performance of the computer system in RMS has been upgraded for operator to be useful. This study is going two steps. First, the main computer, IOCA a part of the whole computer system has been upgraded to Pentium PC, and changed to Window NT-based system. Second, all of the computer system in Hanaro RMS is going to be upgraded. This study has got the following results: a RS-232C serial communication program: between the upgraded IOCA and LCU (Local Control Unit) -- a serial communication test configurating two LCU serial --a parallel communication test configurating two LCU parallel: GUI program to present a radioactive information -- overview schematic display page -- detail display pages -- alarm and event pages -- trend pages and group trend pages.

  6. Upgrade of of monitoring devices for radiation information

    International Nuclear Information System (INIS)

    Kim, Jung Taek; Park, Won Man; Kim, Jung Soo; Lee, Bong Jae; Jae Yoo Kyung

    1999-01-01

    The Radiation Monitoring System (RMS) in Hanaro of KAERI and NPPs of Korea, supplied by victoreen, sometimes has been stopped to use slow 486 PC (Personal computer) and not to be enough memory in main processing computer, IOCA and IOCB, for signal processing and storing. It is very difficult for operator to operate and maintain RMS, because of using an unfamiliar operating system, SCO Unix, of main computer. And also, ScanRad (TM) program for processing and storing radiation signal has Y2K problems and is able to lose and not to display measuring signals. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing operating System to Window NT-based system. Therefore it needs to upgrade the computer system in RMS. This study is upgrading the main computer, IOCA, in RMS of Hanaro to Pentium PC, and changing Operating System to Window NT-based system. Therefore a performance of the computer system in RMS has been upgraded for operator to be useful. This study is going two steps. First, the main computer, IOCA a part of the whole computer system has been upgraded to Pentium PC, and changed to Window NT-based system. Second, all of the computer system in Hanaro RMS is going to be upgraded. This study has got the following results: a RS-232C serial communication program: between the upgraded IOCA and LCU (Local Control Unit) -- a serial communication test configurating two LCU serial --a parallel communication test configurating two LCU parallel: GUI program to present a radioactive information -- overview schematic display page -- detail display pages -- alarm and event pages -- trend pages and group trend pages

  7. The UKIRT Upgrades Programme

    Science.gov (United States)

    Adamson, Andy; Davies, John; Robson, Ian

    Tim Hawarden presented this paper to the 30th anniversary workshop, just a month before his untimely death. The editors have done their best to convert his talk into this paper, and gratefully acknowledge the assistance of Nick Rees (a member of the Upgrades team, now at Diamond Light Source). Tim's discussion concerned the UKIRT Upgrades Project, which ran through the 1990s and transformed the telescope and made it truly competitive on the world stage for operation into the twenty-first century. The reference list at the end of the paper is comprehensive; some of these are referred to in the paper itself and some are included for completeness only.

  8. The CMS ECAL Upgrade for Precision Crystal Calorimetry at the HL-LHC

    CERN Document Server

    Marinelli, Nancy

    2017-01-01

    The Compact Muon Solenoid Experiment (CMS) is operating at the Large Hadron Collider (LHC) with proton-proton collisions at 13 TeV center-of-mass energy and at a bunch spacing of 25 ns. New further challenging running conditions for CMS are expected after the High-Luminosity upgrade of the LHC (HL--LHC). The CMS electromagnetic calorimeter (ECAL) will need to be upgraded to substain the hardned environment.The design and R\\ and D studies for the ECAL upgrade are presented together with first test beam studies. Particular challenges at HL--LHC are the harsh radiation environment, the increasing data rates and the extreme level of pile-up events, with up to 200 simultaneous proton-proton collisions. Precision timing can be exploited to reduce the effect of the pile-up. Time resolution measurementscarried out during test-beams are shown. Plans are also shown for R\\ and D for the new readout and trigger electronics, which must be upgraded due to the increased trigger and latency requirements at the HL--LHC

  9. Reflections on a digital upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tadjalli, M.

    2013-07-01

    Upon receiving US NRC's approval in 2010, the first RPS/ESPS digital upgrade using TELEPERM® XS technology was successfully installed in Spring of 2011 at the first Unit of a three-unit station, followed by the 2nd Unit installation in spring of 2012. Both Units' systems have been operating flawlessly since installation. After about two years of operation, a reflection on digital upgrades and lessons learned, from a vendor perspective, provides valuable insight for the commercial nuclear power industry.

  10. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  11. Directions in refining and upgrading of heavy oil and bitumen

    International Nuclear Information System (INIS)

    Dawson, B.; Parker, R. J.; Flint, L.

    1997-01-01

    The expansion of heavy oil transportation, marketing and refining facilities over the past two decades have been reviewed to show the strides that several Canadian refiners have taken to build up the facilities required to process synthetic crude oil (SCO). Key points made at a conference, convened by the National Centre for Upgrading Technology (NCUT), held in Edmonton during September 1997 to discuss current and future directions in the refining and marketing of heavy oil, bitumen and SCO, were summarized. Among the key points mentioned were: (1) the high entry barriers faced by centralized upgraders, (2) the advantages of integrating SCO or heavy oil production with downstream refining, (3) the stiff competition from Venezuela and Mexico that both SCO and heavy oil will face in the U.S. PADD II market, (4) the differences between Canadian refiners who have profited from hydrocracking and are better able to handle coker-based SCO, and American refiners who rely chiefly on catalytic cracking and are less able to process the highly aromatic SCO, and (5) the disproportionate cost in the upgrading process represented by the conversion of asphaltenes. Challenges and opportunities for key stakeholders, i.e. producers, refiners, marketers and technology licensors also received much attention at the Edmonton conference

  12. Status of the R&D activities for the upgrade of the ALICE TPC

    Science.gov (United States)

    Deisting, Alexander

    2018-02-01

    After the Long Shutdown 2 (LS2) the LHC will provide lead-lead collisions at interaction rates as high as 50 kHz. In order to cope with such conditions the ALICE Time Projection Chamber (TPC) needs to be upgraded. After the upgrade the TPC will run in a continuous mode, without any degradation of the momentum and dE/dx resolution compared to the performance of the present TPC. Since readout by multi-wire proportional chambers is no longer feasible with these requirements, new technologies have to be employed. In the new readout chambers the electron amplification is provided by a stack of four Gas ElectronMultiplier (GEM) foils. Here foils with a standard hole pitch of 140 μm as well as large pitch foils (280 μm) are used. Their high voltage settings and orientation have been optimised to provide an energy resolution of σE/E ≤ 12% at the photopeak of 55Fe. At the same settings the Ion BackFlow into the drift volume is less than 1% of the effective number of ions produced during gas amplification and the primary ionisations. This is necessary to prevent the accumulation of space charge, which eventually will distort the field in the drift volume. To ensure stable operation at the high loads during LHC run 3 the chambers have to be robust against discharges, too. With the selected configuration in a quadruple GEMstack the discharge probability is kept at the level of 10-12 discharges per incoming hadron. An overview of the ALICE TPC upgrade activities will be given in these proceedings and the optimised settings foreseen for the GEM stacks of the future readout chambers are introduced. Furthermore the outcome of two beam time campaigns at SPS and PS (at CERN) in the end of 2014 is shown. At this campaigns the stability against discharges and the dE/dx performance of a full size readout chamber prototype was tested. In addition it is reported on charging-up studies of 4GEM stacks and on tests of electromagnetic sagging of large GEM foils.

  13. Completion of the ATLAS control system upgrade

    International Nuclear Information System (INIS)

    Munson, F. H.

    1998-01-01

    In the fall of 1992 at the SNEAP(Symposium of North Eastern Accelerator Personnel) a project to up grade the ATLAS (Argonne Tandem Linear Accelerator System) control system was first reported. Not unlike the accelerator it services the control system will continue to evolve. However, the first of this year has marked the completion of this most recent upgrade project. Since the control system upgrade took place during a period when ATLAS was operating at a record number of hours, special techniques were necessary to enable the development of the new control system ''on line'' while still saving the needs of normal operations. This paper reviews the techniques used for upgrading the ATLAS control system while the system was in use. In addition a summary of the upgrade project and final configuration, as well as some of the features of the new control system is provided

  14. Upgrading the ATLAS Tile Calorimeter Electronics

    CERN Document Server

    Popeneciu, G; The ATLAS collaboration

    2014-01-01

    The Tile Calorimeter (TileCal) is the central hadronic calorimeter of the ATLAS experiment at LHC. Around 2023, after the upgrade of the LHC (High Luminosity LHC, phase 2) the peak luminosity will increase by a factor of 5 compared to the design value (1034 cm-2 s-1), thus requiring an upgrade of the TileCal readout electronics. Except the 9852 photomultipliers (PMTs), most of the on- and off-detector electronics will be replaced, with the aim of digitizing all PMT pulses at 40 MHz at the front-end level and sending them with 10 Gbps optical links to the back-end electronics. Moreover, to increase reliability, redundancy will be introduced at different levels. Three different options are currently being investigated for the front-end electronics and extensive test beam studies are planned to select the best option. One demonstrator prototype module is also planned to be inserted in TileCal in 2014 that will include hybrid electronic components able to probe the new design, but still compatible with the presen...

  15. Is your upgrade worth it? process mining can tell

    NARCIS (Netherlands)

    Genuchten, van M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  16. Is your upgrade worth it? Process mining can tell

    NARCIS (Netherlands)

    Genuchten, M.J.I.M.; Mans, R.S.; Reijers, H.A.; Wismeijer, D.

    2014-01-01

    Software vendors typically release updates and upgrades of their software once or twice a year. Users are then faced with the question of whether the upgrade is worth the price and the trouble. The software industry doesn't provide much evidence that it's worthwhile to upgrade to new releases. The

  17. Environmental upgrading of a landfill

    International Nuclear Information System (INIS)

    Agostinetto, V.; Vendrame, G.

    1999-01-01

    This article refers to an experimental study concerning the vegetative upgrading of a closed-down landfill (once used for industrial waste disposal). The aim was to check the possibility of reconstructing or aiding the natural growth of a vegetation in keeping with the surrounding area, in a tried environment such as that of landfills. The original idea contained in the approved project - which meant to generically upgrade the territory by planting species belonging to the grassy layer, shrubs and trees - has, with time, undergone some changes. On the basis of both the knowledge acquired during management and of a more accurate analysis of the territory, the experiment was preferred to aim at finding out which were the species, both continental and Mediterranean, able to gradually adjust to the surrounding landscape, leaving to natural selection the task to decide which species were more suitable to the upgrading of closed-down landfills, and which planting technique was more effective [it

  18. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  19. Upgrading of bio-oil to boiler fuel by catalytic hydrotreatment and esterification in an efficient process

    International Nuclear Information System (INIS)

    Zhang, Xinghua; Chen, Lungang; Kong, Wei; Wang, Tiejun; Zhang, Qi; Long, Jinxing; Xu, Ying; Ma, Longlong

    2015-01-01

    Bio-oil can't be directly used as fuel due to its deteriorate properties. Here, an efficient catalytic upgrading process for the bio-oil, including esterification, hydrogenation, hydrodeoxygenation and depolymerization, is proposed with multifunctional catalyst Ni/SiO 2 –ZrO 2 and biomass-derived solvent ethanol. Results showed that esters, alcohols, phenolics, and cyclo-ketones were the main components in the upgraded bio-oil while aldehydes were removed completely via catalytic hydrogenation and acids were removed by catalytic esterification with supercritical ethanol. The pH value of upgraded bio-oil rose drastically from 2.38 to 5.24, and the high heating value increased to 24.4 MJ kg −1 . Comparison characterization on the upgraded and crude bio-oil using FT-IR, GPC (Gel permeation chromatography) and 13 C NMR (Nuclear Magnetic Resonance) demonstrated that lignin-derived oligomers contained in crude bio-oil were further depolymerized over Ni/SiO 2 –ZrO 2 catalyst. The improved properties suggest that the upgraded bio-oil is more suitable to be used as boiler fuel. Furthermore, the loss of carbon is negligible because formation of coke is suppressed during the upgrading process. - Highlights: • Acid can be converted via catalytic esterification in supercritical ethanol. • Aldehydes can be removed completely during the upgrading process. • Lignin-derived oligomers were further depolymerized during the upgrading process. • Formation of coke is effectively inhibited during the upgrading process

  20. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  1. Development of an ATCA IPMI controller mezzanine board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade

    CERN Document Server

    Dumont Dayot, N

    2012-01-01

    In the context of the LHC upgrades, a new Read-Out Driver (ROD) board for the ATLAS LAr calorimeter is being developed. xTCA (Advanced/Micro Telecom Computing Architecture) is becoming a standard in high energy physics and is a serious candidate for future readout systems. We will present our current developments to master ATCA and to integrate a large number of very high speed links (96 links/8.5 Gbps) on a ROD Evaluator ATCA board. To manage our ROD Evaluator, we have developed a versatile ATCA IPMI controller for ATCA boards which is FPGA Mezzanine Card (FMC) compliant.

  2. Development of an ATCA IPMI Controller Mezzanine Board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade

    CERN Document Server

    "LETENDRE, N; The ATLAS collaboration

    2011-01-01

    In the context of the LHC upgrades, a new Read-Out Driver (ROD) board for the ATLAS LAr calorimeter is being developed. xTCA (Advanced/Micro Telecom Computing Architecture) is becoming a standard in high energy physics and is a serious candidate for future readout systems. We will present our current developments to master ATCA and to integrate a large number of very high speed links (96 links/8.5 Gbps) on a ROD Evaluator ATCA board. To manage our ROD Evaluator, we have developed a versatile ATCA IPMI controller for ATCA boards which is FPGA Mezzanine Card (FMC) compliant.

  3. Development of an ATCA IPMI controller mezzanine board to be used in the ATCA developments for the ATLAS Liquid Argon upgrade

    CERN Document Server

    Letendre, N; The ATLAS collaboration

    2012-01-01

    In the context of the LHC upgrade, we develop a new Read Out Driver (ROD) for the ATLAS Liquid Argon (LAr) community. ATCA and μTCA (Advanced/Micro Telecom Computing Architecture) is becoming a standard in high energy physics and a strong candidate to be used for boards and crates. We work to master ATCA and to integrate a large number of high speed links (96 links at 8.5 Gbps) on a ROD evaluation ATCA board. A versatile ATCA IPMI controller for ATCA boards which is FPGA Mezzanine Card (FMC) compliant has been developed to control the ROD evaluation board.

  4. Status of the Upgrade of the CERN PS Booster

    CERN Document Server

    Hanke, K; Angoletta, M; Bartmann, W; Bartolome, S; Benedetto, E; Bertone, C; Blas, A; Bonnal, P; Borburgh, J; Bozzini, D; Butterworth, A; Carli, C; Carlier, E; Cole, J; Dahlen, P; Delonca, M; Dobers, T; Findlay, A; Froeschl, R; Hansen, J; Hay, D; Jensen, S; Lacroix, J; Le Roux, P; Lopez Hernandez, L; Maglioni, C; Masi, A; Mason, G; Mathot, S; Mikulec, B; Muttoni, Y; Newborough, A; Nisbet, D; Olek, S; Paoluzzi, M; Perillo-Marcone, A; Pittet, S; Puccio, B; Raginel, V; Riffaud, B; Ruehl, I; Sarrió Martínez, A; Tan, J; Todd, B; Venturi, V; Weterings, W

    2013-01-01

    The CERN PS Booster (PSB) is presently undergoing an ambitious consolidation and upgrade program within the frame of the LHC Injectors Upgrade (LIU) project. This program comprises a new injection scheme for H- ions from CERN’s new Linac4, the replacement of the main RF systems and an energy upgrade of the PSB rings from 1.4 to 2 GeV which includes the replacement of the main magnet power supply as well as the upgrade of the extraction equipment. This paper describes the status and plans of this work program.

  5. Upgrading the data acquisition and control systems of the European Breeding Blanket Test Facility

    International Nuclear Information System (INIS)

    Mannori, Simone; Sermenghi, Valerio; Utili, Marco; Malavasi, Andrea; Gianotti, Daniel

    2013-01-01

    Highlights: • Data Acquisition and Control Systems (DACS) upgrading of experimental plant for full size thermo hydraulic testing of nuclear subsystems. • DACS development using integrated hardware/software platform with graphical programming (LabVIEW). • Development of simplified models for real-time simulation. • Rapid prototyping with real time simulation of the complete plant. • Using the code developed for the real time simulator for the real plant DACS. -- Abstract: The EBBTF (European Breeding Blanket Test Facility) experimental plant is a key component for the development of the breeding blankets (TBMs test blanket modules, HCLL helium cooled lithium lead and HCPB helium cooled pebble bed types) used by ITER. EBBTF is an experimental plant which provides the double breeding/cooling loops (liquid metal and gas) required for HCLL testing. EBBTF is composed of four subsystems (TBM, IELLLO integrated European lead lithium loop, HE-FUS3 helium fusion loop, version 3 and helium compressor build by ATEKO) with dedicated control systems realized with hardware/software combinations covering 15 years (1995–2010) time span. At the end of 2010 we began to upgrade the HE-FUS3 data acquisition control systems (DACS) replacing the obsolete PLC Siemens S5 with National Instruments Compact FieldPoint and LabVIEW. The control room has been completely reorganized using high resolution monitors and workstations linked with standard Ethernet interfaces. The data acquisition, control, safety and SCADA software has been completely developed in ENEA using LabVIEW. In this paper we are going to discuss the technical difficulties and the solutions that we have used to accomplish the upgrade

  6. Captain upgrade CRM training: A new focus for enhanced flight operations

    Science.gov (United States)

    Taggart, William R.

    1993-01-01

    Crew Resource Management (CRM) research has resulted in numerous payoffs of applied applications in flight training and standardization of air carrier flight operations. This paper describes one example of how basic research into human factors and crew performance was used to create a specific training intervention for upgrading new captains for a major United States air carrier. The basis for the training is examined along with some of the specific training methods used, and several unexpeced results.

  7. The Upgrade to Hybrid Incubators in China

    DEFF Research Database (Denmark)

    Hu, Yimei; Gao, Yuchen

    countries and emerging economics. Based on a single in-depth case-study of Tuspark Incubator, this study explores key factors and specific ways for the upgrade to hybrid incubators in the context of China. By using categorical analysis, three factors, i.e. incubation subdivision, intermediary platform......, and proactive approach, are found to be essential for a formerly government-sponsored TBI’s upgrading. The result of this study also provides new insights and several implications for incubator managers and policy makers in emerging economies. In addition, whether the key factors can be used in upgrade of other...... TBIs in China requires further study....

  8. Immediate catalytic upgrading of soybean shell bio-oil

    International Nuclear Information System (INIS)

    Bertero, Melisa; Sedran, Ulises

    2016-01-01

    The pyrolysis of soybean shell and the immediate catalytic upgrading of the bio-oil over an equilibrium FCC catalyst was studied in order to define its potential as a source for fuels and chemicals. The experiments of pyrolysis and immediate catalytic upgrading were performed at 550 °C during 7 min with different catalysts to oil relationships in an integrated fixed bed pyrolysis-conversion reactor. The results were compared under the same conditions against those from pine sawdust, which is a biomass source commonly used for the production of bio-oil. In the pyrolysis the pine sawdust produced more liquids (61.4%wt.) than the soybean shell (54.7%wt.). When the catalyst was presented, the yield of hydrocarbons increased, particularly in the case of soybean shell, which was four time higher than in the pyrolysis. The bio-oil from soybean shell produced less coke (between 3.1 and 4.3%wt.) in its immediate catalytic upgrading than that from pine sawdust (between 5 and 5.8%wt.), due to its lower content of phenolic and other high molecular weight compounds (three and five times less, respectively). Moreover, soybean shell showed a higher selectivity to hydrocarbons in the gasoline range, with more olefins and less aromatic than pine sawdust. - Highlights: • Soybean shell is a possible source of fuels with benefits as compared to pine sawdust. • Bio-oils upgraded over FCC catalyst in an integrated pyrolysis-conversion reactor. • Pine sawdust bio-oil had more phenols than soybean shell bio-oil. • Soybean shell bio-oil produced more hydrocarbons in gasoline range and less coke.

  9. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade is being performed during the Extended Year End Technical Stop of 2016 â?? 2017. In the framework of the upgrade, the PMT boxes are being reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics is also being upgraded to QIE10-based electronics which will implement larger dynamic range and a 6-bit TDC to eliminate the background to have an effect on the trigger. Following this major upgrade, the Hadron Forward Calorimeters will be commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  10. The upgrade of the LHCb trigger system

    CERN Document Server

    INSPIRE-00259834; Fitzpatrick, C.; Gligorov, V.; Raven, G.

    2014-10-20

    The LHCb experiment will operate at a luminosity of $2\\times10^{33}$ cm$^{-2}$s$^{-1}$ during LHC Run 3. At this rate the present readout and hardware Level-0 trigger become a limitation, especially for fully hadronic final states. In order to maintain a high signal efficiency the upgraded LHCb detector will deploy two novel concepts: a triggerless readout and a full software trigger.

  11. A control system upgrade of the spear synchrotron and injector

    International Nuclear Information System (INIS)

    Garrett, R.; Howry, S.; Wermelskirchen, C.; Yang, J.

    1995-11-01

    The SPEAR electron synchrotron is an old and venerable facility with a history of great physics. When this storage ring was converted to serve as a full-time synchrotron light source, it was evident that the facility was due for an overhaul of its control system. Outdated hardware interfaces, custom operator interfaces, and the control computer itself were replaced with off-the-shelf distributed intelligent controllers and networked X-workstations. However, almost all applications and control functions were retained by simply rewriting the layer of software closest to each new device. The success of this upgrade prompted us to do a similar upgrade of our Injector system. Although the Injector was already running an X-windows based control system, it was non-networked and Q-bus based. By using the same Ethernet based controllers that were used at SPEAR, we were able to integrate the two systems into one that resembles the ''standard model'' for control systems, and at the same time preserve the applications software that has been developed over the years on both systems

  12. SLC energy upgrade program at SLAC

    International Nuclear Information System (INIS)

    Loew, G.A.; Allen, M.A.; Cassel, R.L.; Dean, N.R.; Konrad, G.T.; Koontz, R.F.; Lebacqz, J.V.

    1985-01-01

    The SLAC Linear Collider (SLC) must reach a nominal center-of-mass energy of 100 GeV to fulfill its high energy physics goals. This paper describes the energy upgrade program that is being implemented on the SLAC linear accelerator to meet these goals. It includes a discussion of the design requirements and available technical options, the rationale for the adopted solution, and the technical problems involved in the engineering and production of klystrons and modulators

  13. SLC Energy Upgrade Program at SLAC

    International Nuclear Information System (INIS)

    Loew, G.A.; Allen, M.A.; Cassel, R.L.; Dean, N.R.; Konrad, G.T.; Koontz, R.F.; Lebacqz, J.V.

    1985-03-01

    The SLAC Linear Collider (SLC) must reach a nominal center-of-mass energy of 100 GeV to fulfill its high energy physics goals. This paper describes the energy upgrade program that is being implemented on the SLAC linear accelerator to meet these goals. It includes a discussion of the design requirements and available technical options, the rationale for the adopted solution, and the technical problems involved in the engineering and production of klystrons and modulators

  14. The Phase II Upgrade of the ATLAS Calorimeter

    CERN Document Server

    Tartarelli, Giuseppe Francesco; The ATLAS collaboration

    2017-01-01

    This presentation will show the status of the upgrade projects of the ATLAS calorimeter system for the high luminosity phase of the LHC (HL-LHC). For the HL-LHC, the instantaneous luminosity is expected to increase up to L ≃ 7.5 × 1034 cm−2 s−1 and the average pile-up up to 200 interactions per bunch crossing. The Liquid Argon (LAr) calorimeter electronics will need to be replaced to cope with these challenging conditions: the expected radiation doses will indeed exceed the qualification range of the current readout system, and the upgraded trigger system will require much longer data storage in the electronics (up to 60 us), that the current system cannot sustain. The status of the R&D of the low-power ASICs (pre-amplifier, shaper, ADC, serializer and transmitters) and of the readout electronics design will be discussed. Moreover, a High Granularity Timing Detector (HGTD) is proposed to be added in front of the LAr calorimeters in the end-cap region (2.4 <|eta|< 4.2) for pile-up mitigation a...

  15. Upgrading of radon's type near surface repository in Latvia

    International Nuclear Information System (INIS)

    Abramenkovs, A.

    2006-01-01

    In 1959, the Soviet government decided to construct the near surface radioactive wastes repository 'Radons' near the Baldone city. It was put in operation in 1962. The changes in the development of the repository were induced by the necessarily to upgrade it for disposal of radioactive wastes from the decommissioning of the Salaspils Research Reactor (SRR). The safety assessment of repository was performed during 2000-2001 under the PHARE project for necessary upgrades of repository. The outline design for new vaults and interim storage for long lived radioactive wastes was elaborated during 2003-2004 years. The Environmental Impact Assessment (EIA) for upgrade of Baldone repository was performed during 2004-2005 years. It was found, that additional efforts must be devoted for solution of social aspects o for successful operation and upgrade of repository. It was shown by EIA, that the local population has a negative opinion against the upgrade of repository in Latvia. The main recommendations for upgrades were connected with increasing the safety of repository, increasing of PR activities for education of society and developing of compensation mechanism for local municipality. (author)

  16. Optimization bitumen-based upgrading and refining schemes

    Energy Technology Data Exchange (ETDEWEB)

    Munteanu, M.; Chen, J. [National Centre for Upgrading Technology, Devon, AB (Canada); Natural Resources Canada, Devon, AB (Canada). CanmetENERGY

    2009-07-01

    This poster highlighted the results of a study in which the entire refining scheme for Canadian bitumen as feedstocks was modelled and simulated under different process configurations, operating conditions and product structures. The aim of the study was to optimize the economic benefits, product quality and energy use under a range of operational scenarios. Optimal refining schemes were proposed along with process conditions for existing refinery configurations and objectives. The goal was to provide guidelines and information for upgrading and refining process design and retrofitting. Critical steps were identified with regards to the upgrading process. It was concluded that the information obtained from this study would lead to significant improvement in process performance and operations, and in reducing the capital cost for building new upgraders and refineries. The simulation results provided valuable information for increasing the marketability of bitumen, reducing greenhouse gas emissions and other environmental impacts associated with bitumen upgrading and refining. tabs., figs.

  17. Instrument hardware and software upgrades at IPNS

    International Nuclear Information System (INIS)

    Worlton, Thomas; Hammonds, John; Mikkelson, D.; Mikkelson, Ruth; Porter, Rodney; Tao, Julian; Chatterjee, Alok

    2006-01-01

    IPNS is in the process of upgrading their time-of-flight neutron scattering instruments with improved hardware and software. The hardware upgrades include replacing old VAX Qbus and Multibus-based data acquisition systems with new systems based on VXI and VME. Hardware upgrades also include expanded detector banks and new detector electronics. Old VAX Fortran-based data acquisition and analysis software is being replaced with new software as part of the ISAW project. ISAW is written in Java for ease of development and portability, and is now used routinely for data visualization, reduction, and analysis on all upgraded instruments. ISAW provides the ability to process and visualize the data from thousands of detector pixels, each having thousands of time channels. These operations can be done interactively through a familiar graphical user interface or automatically through simple scripts. Scripts and operators provided by end users are automatically included in the ISAW menu structure, along with those distributed with ISAW, when the application is started

  18. Upgrading instrumentation and control systems for plant safety and operation

    International Nuclear Information System (INIS)

    Martin, M.; Prehler, H.J.; Schramm, W.

    1997-01-01

    Upgrading the electrical systems and instrumentation and control systems has become increasingly more important in the past few years for nuclear power plants currently in operation. As the requirements to be met in terms of plant safety and availability have become more stringent in the past few years, Western plants built in the sixties and seventies have been the subject of manifold backfitting and upgrading measures in the past. In the meantime, however, various nuclear power plants are facing much more thorough upgrading phases because of the difficulties in obtaining spare parts for older equipment systems. As digital technology has become widespread in many areas because of its advantages, and as applications are continuously expanding, conventional equipment and systems are losing more and more ground as a consequence of decreasing demand. Merely because of the pronounced decline in demand for conventional electronic components it is possible for equipment manufacturers to guarantee spare parts deliveries for older systems only for specific future periods of time. In addition, one-off manufacture entails high costs in purchases of spare parts. As a consequence of current thinking more and more focusing on availability and economy, upgrading of electrical systems and instrumentation and control systems is becoming a more and more topical question, for older plants even to ensure completion of full service life. (orig.) [de

  19. Advances in the density profile evaluation from broadband reflectometry on ASDEX upgrade

    International Nuclear Information System (INIS)

    Varela, P.; Manso, M.; Conway, G.

    2001-01-01

    The high temporal and spatial resolutions provided by broadband microwave reflectometry make it an attractive diagnostic technique to measure the density profile in fusion plasmas. However, great problems have been encountered due to the plasma turbulence that difficult, and sometimes prevent, the routine evaluation of density profiles. Advanced broadband systems employ ultra-fast sweeping in an attempt to perform the profile measurement in a time window smaller than the temporal scale of the main plasma fluctuations but this is not sufficient. Indeed, abrupt plasma movements and/or spatial turbulence always affect the reflectometry signals, as shown by numerical studies (with both one- and two-dimensional codes), for the case of ultra-fast sweeping and pulse radar systems. For this reason not only the system performance is important but the software tools also play a crucial role for reflectometry to become a standard density profile diagnostic. Here we present the recent advances towards automatic evaluation of density profiles from broadband reflectometry on ASDEX Upgrade. For regimes with moderate levels of plasma turbulence, density profiles are obtained from single reflectometry samples (temporal resolution of 20 μs), and for higher turbulence levels average profiles are obtained from bursts of ultra-fast (20 μs), closely spaced (10 μs) sweeps. This method improved the accuracy and reliability of density profiles, which can now be obtained automatically from the edge to the bulk plasma - using reflectometry alone - in most plasma regimes of ASDEX Upgrade. New data processing capability has been implemented that allows the profiles to be available to the end-users 10-12 minutes after each discharge. These developments were possible due to the flexibility and high performance of the control and data acquisition systems and to the large number of measurements that can be performed with the diagnostic during each discharge (720 profiles both on the low- and

  20. A HIGH BANDWIDTH BIPOLAR POWER SUPPLY FOR THE FAST CORRECTORS IN THE APS UPGRADE*

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Ju; Sprau, Gary

    2017-06-25

    The APS Upgrade of a multi-bend achromat (MBA) storage ring requires a fast bipolar power supply for the fast correction magnets. The key performance requirement of the power supply includes a small-signal bandwidth of 10 kHz for the output current. This requirement presents a challenge to the design because of the high inductance of the magnet load and a limited input DC voltage. A prototype DC/DC power supply utilizing a MOSFET H-bridge circuit with a 500 kHz PWM has been developed and tested successfully. The prototype achieved a 10-kHz bandwidth with less than 3-dB attenuation for a signal 0.5% of the maximum operating current of 15 amperes. This paper presents the design of the power circuit, the PWM method, the control loop, and the test results.

  1. Energy efficiency standards for residential and commercial equipment: Additional opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Rosenquist, Greg; McNeil, Michael; Iyer, Maithili; Meyers, Steve; McMahon, Jim

    2004-08-02

    Energy efficiency standards set minimum levels of energy efficiency that must be met by new products. Depending on the dynamics of the market and the level of the standard, the effect on the market for a given product may be small, moderate, or large. Energy efficiency standards address a number of market failures that exist in the buildings sector. Decisions about efficiency levels often are made by people who will not be responsible for the energy bill, such as landlords or developers of commercial buildings. Many buildings are occupied for their entire lives by very temporary owners or renters, each unwilling to make long-term investments that would mostly reward subsequent users. And sometimes what looks like apathy about efficiency merely reflects inadequate information or time invested to evaluate it. In addition to these sector-specific market failures, energy efficiency standards address the endemic failure of energy prices to incorporate externalities. In the U.S., energy efficiency standards for consumer products were first implemented in California in 1977. National standards became effective starting in 1988. By the end of 2001, national standards were in effect for over a dozen residential appliances, as well as for a number of commercial sector products. Updated standards will take effect in the next few years for several products. Outside the U.S., over 30 countries have adopted minimum energy performance standards. Technologies and markets are dynamic, and additional opportunities to improve energy efficiency exist. There are two main avenues for extending energy efficiency standards. One is upgrading standards that already exist for specific products. The other is adopting standards for products that are not covered by existing standards. In the absence of new and upgraded energy efficiency standards, it is likely that many new products will enter the stock with lower levels of energy efficiency than would otherwise be the case. Once in the stock

  2. X-ray crystal spectrometer upgrade for ITER-like wall experiments at JET

    Energy Technology Data Exchange (ETDEWEB)

    Shumack, A. E., E-mail: amy.shumack@ccfe.ac.uk [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); FOM Institute DIFFER, P.O. Box 1207, NL-3430 BE Nieuwegein (Netherlands); Rzadkiewicz, J. [National Centre for Nuclear Research, Andrzeja Sołtana 7, 05-400 Otwock (Poland); Chernyshova, M.; Czarski, T.; Karpinski, L. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Jakubowska, K. [Institute of Plasma Physics and Laser Microfusion, Hery 23, 01-497 Warsaw (Poland); Université Bordeaux, CNRS, CEA, CELIA, UMR 5107, F-33405 Talence (France); Scholz, M. [Institute of Nuclear Physics PAN, ul. Radzikowskiego 152, 31-342 Kraków (Poland); Byszuk, A.; Cieszewski, R.; Kasprowicz, G.; Pozniak, K.; Wojenski, A.; Zabolotny, W. [Institute of Electronic Systems, Warsaw University of Technology, 00-665 Warsaw (Poland); Dominik, W. [Faculty of Physics, Institute of Experimental Physics, Warsaw University, 00-681 Warsaw (Poland); Conway, N. J.; Dalley, S.; Tyrrell, S.; Zastrow, K.-D. [JET-EFDA, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Figueiredo, J. [EFDA-CSU, Culham Science Centre, Abingdon OX14 3DB (United Kingdom); Associação EURATOM/IST, Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Av Rovisco Pais, 1049-001 Lisbon (Portugal); and others

    2014-11-15

    The high resolution X-Ray crystal spectrometer at the JET tokamak has been upgraded with the main goal of measuring the tungsten impurity concentration. This is important for understanding impurity accumulation in the plasma after installation of the JET ITER-like wall (main chamber: Be, divertor: W). This contribution provides details of the upgraded spectrometer with a focus on the aspects important for spectral analysis and plasma parameter calculation. In particular, we describe the determination of the spectrometer sensitivity: important for impurity concentration determination.

  3. Seismic analysis, evaluation and upgrade design for a nuclear facility exhaust stack building

    International Nuclear Information System (INIS)

    Malik, L.E.; Kabir, A.F.

    1991-01-01

    This paper reports on an exhaust stack building of a nuclear reactor facility with complex structural configuration that has been analyzed and evaluated for seismic forces. This building was built in the 1950's and had not been designed to resist seismic forces. A very rigorous analysis and evaluation program was implemented to minimize the costly retrofits required to upgrade the building to resist high seismic forces. The seismic evaluations were performed for the building in its as-is configuration, and as modified for several upgrade schemes. Soil-structure-interaction, base mat flexibility and the influence of the nearby reactor building have been considered in the seismic analyses. The rigorous analyses and evaluation enabled limited upgrades to qualify the stack building for the seismic forces

  4. A summary of the regional upgrader business plan

    International Nuclear Information System (INIS)

    Carpenter, J.S.

    1991-01-01

    The stakeholders with potential interests in an Alberta regional upgrader for bitumen, heavy oil, or refinery residue were identified and a reasonably comprehensive business plan for such an upgrader was created and analyzed. Assuming a plant accepting 30,000 bbl/d of feedstock using known hydrocracking and hydroprocessing technologies, producing a synthetic crude oil of a quality good enough to substitute for Alberta light crude in existing refineries, the risks, financing arrangements, and base case economics were examined. According to reasonable price forecasts and a socio-economic benefit assessment, there are enough benefits in such an upgrader to make its construction attractive in the near term. However, conventional investment economics make it unlikely that such a project could be supported in Alberta's current business environment. Accordingly, the business plan was revised to reduce risks and increase profitability to equity holders. The plant capacity would be doubled, with a major oil company acquiring half the output for its own production at less than half the installed cost. The rest of the plant would be owned by government and by smaller producers who would gain access to the upgrader feedstock capacity. A collar mechanism is offered to reduce bitumen price risks without impairing upgrader economics. A number of niche opportunities are also identified within the regional upgrader concept that would further enhance the return through lower costs. 2 figs., 4 tabs

  5. Fitting partially upgraded oils into pipelines and refinery markets

    International Nuclear Information System (INIS)

    Flaherty, G.

    2000-01-01

    The logistics of transporting partially upgraded crudes in feeder and trunk pipeline systems is discussed. Logistic alternatives are evaluated against economic drivers for partial upgrading, and the impact of crude transportation logistics on the quality of crude that reaches refinery gates is assessed. The potential advantages of partial upgrading in the field are reviewed (including reduction of diluent required to meet pipeline density and viscosity specifications, cost and availability of diluent, limitations in diluent transportation infrastructure, increased chemical stability, increased attractiveness to refineries, shortage of refinery coking capacity, higher market value). The pros and cons of various upgrading processes, and the implications of each for producers and refiners are explained. The advantages of moving to large common streams, as opposed to the concept of 'boutique' crudes, are stressed as the surest way for producers to realize the maximum value of partially upgraded crudes

  6. Energy upgrading measures improve also indoor climate

    DEFF Research Database (Denmark)

    Foldbjerg, Peter; Knudsen, Henrik Nellemose

    2014-01-01

    A new survey shows that the economy is what motivates Danish owners of single-family houses the most to start energy upgrading, and that improved indoor climate is also an important factor. After the upgrading, homeowners experience both improved economy and indoor climate. In a strategy...... to increase the number of homeowners who venture into a major energy upgrading of their house, the demonstrated positive side effects, more than energy savings, should be included in the communication to motivate homeowners. The barriers should be reduced by “taking the homeowners by the hand” and helping...... them to choose relevant energy-saving solutions as well as clarifying the financial consequences and opportunities....

  7. How Do Trading Firms Upgrade Skills and Technology: A Theoretical Model

    Directory of Open Access Journals (Sweden)

    Mojca Lindic

    2015-12-01

    Full Text Available This paper studies the mechanisms of skill upgrading in trading firms by developing a theoretical model that relates the individual’s incentives for acquiring higher skills to the profit-maximizing behaviour of trading firms. The model shows that only the high ability individuals have incentives for acquiring higher skills, as long as they are compensated with higher wages after entering employment. Furthermore, high-productive firms have incentives for investing in higher technology, to employ high-skilled labour, and to engage in international trade. The decisions for technology dress-up and skill upgrading coincide with firm’s decisions to start importing and exporting as the latter requires higher technology and high-skilled labour. Contributions of the paper are twofold: gaining new insights by combining fragments of models on individual’s and firm’s behaviours, and broadening the content of the Melitz (2003 model by introducing importers and controlling for skilled and unskilled labour.

  8. High mechanical performance of Areva upgraded fuel assemblies for PWR in USA

    International Nuclear Information System (INIS)

    Gottuso, Dennis; Canat, Jean-Noel; Mollard, Pierre

    2007-01-01

    operating environments, in high duty conditions and at extended burnups. AREVA's new family of upgraded products is offered to our customers worldwide. After first LFA's (Lead Fuel Assemblies) in Europe in 2006, and in the US in 2007, a first reload in a European 15x15 reactor will be loaded in 2007. This supply of upgraded products to our customers fully supports the more demanding requirements requested by utilities. The well proven characteristics of all components and their combination bring proven robustness to the products of AREVA's new family of fuel assemblies. (authors)

  9. The Timepix3 Telescope for LHCb Upgrade RD 1 measurements

    CERN Document Server

    Saunders, Daniel Martin

    2016-01-01

    The Timepix3 telescope is a high rate, data driven beam telescope created for LHCb upgrade studies, such as sensor performance for prototypes of the vertex locator (VELO) upgrade. When testing VELO prototypes the readout is identical to the telescope, and additionally, a simple way to integrate triggers from other detectors is also provided, allowing tracks to be synchronised offline with other devices under test. Examples of LHCb upgrade detectors which have been qualified with the Timepix3 telescope are the Upstream Tracker (UT), Scintillating Fibres (SciFi), Ring Imaging CHerenkov (RICH), and Time Of internally Reflected CHerenkov light (TORCH). The telescope was installed in the SPS North hall at CERN. It consists of 8 planes with 300 μ m p-on-n silicon sensors read out by Timepix3 ASICs. Tracks measured with the telescope have excellent temporal ( ∼ 1 ns) and spatial resolution ( 2 μ m). The telescope has been operated with a rate of tracks written to disk up to 5 MHz - limited only by conditions at ...

  10. Performance measurement of the upgraded D0 central track trigger

    International Nuclear Information System (INIS)

    Mommsen, Remigius K.; Manchester U.

    2006-01-01

    The D0 experiment was upgraded in spring 2006 to harvest the full physics potential of the Tevatron accelerator at Fermi National Accelerator Laboratory, Batavia, Illinois, USA. It is expected that the peak luminosity delivered by the accelerator will increase to over 300 x 10 30 cm -2 s -1 . One of the upgraded systems is the Central Track Trigger (CTT). The CTT uses the Central Fiber Tracker (CFT) and Preshower detectors to identify central tracks with p T > 1.5GeV at the first trigger level. Track candidates are formed by comparing fiber hits to predefined track equations. In order to minimize latency, this operation is performed in parallel using combinatorial logic implemented in FPGAs. Limited hardware resources prevented the use of the full granularity of the CFT. This leads to a high fake track rate as the occupancy increases. In order to mitigate the problem, new track-finding hardware was designed and commissioned. We report on the upgrade and the improved performance of the CTT system

  11. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  12. Functional Upgrading and Value Capture of Multinational Subsidiaries

    DEFF Research Database (Denmark)

    Burger, Anže; Jindra, Björn; Marek, Philipp

    2018-01-01

    survey-based business function indicators with longitudinal accounting data for a representative sample of multinational subsidiaries located in six Central and Eastern European countries (CEECs), we assess the impact of functional upgrading on foreign subsidiaries' value capture. The results provide......This paper investigates the relationship between the value capture of multinational subsidiaries and functional upgrading, which is defined as a diversification of employment from primary business functions to higher value adding activities such as ICT, R&D, marketing or logistics. By combining...... robust evidence that the breadth as well as the scope of functional upgrading induces an upward shift of subsidiaries' value added. The effect of functional upgrading is stronger in the earlier phases after entry of the foreign investor, while the long-term growth trend remains unaffected....

  13. A review on optimization production and upgrading biogas through CO2 removal using various techniques.

    Science.gov (United States)

    Andriani, Dian; Wresta, Arini; Atmaja, Tinton Dwi; Saepudin, Aep

    2014-02-01

    Biogas from anaerobic digestion of organic materials is a renewable energy resource that consists mainly of CH4 and CO2. Trace components that are often present in biogas are water vapor, hydrogen sulfide, siloxanes, hydrocarbons, ammonia, oxygen, carbon monoxide, and nitrogen. Considering the biogas is a clean and renewable form of energy that could well substitute the conventional source of energy (fossil fuels), the optimization of this type of energy becomes substantial. Various optimization techniques in biogas production process had been developed, including pretreatment, biotechnological approaches, co-digestion as well as the use of serial digester. For some application, the certain purity degree of biogas is needed. The presence of CO2 and other trace components in biogas could affect engine performance adversely. Reducing CO2 content will significantly upgrade the quality of biogas and enhancing the calorific value. Upgrading is generally performed in order to meet the standards for use as vehicle fuel or for injection in the natural gas grid. Different methods for biogas upgrading are used. They differ in functioning, the necessary quality conditions of the incoming gas, and the efficiency. Biogas can be purified from CO2 using pressure swing adsorption, membrane separation, physical or chemical CO2 absorption. This paper reviews the various techniques, which could be used to optimize the biogas production as well as to upgrade the biogas quality.

  14. Technical Proposal for the Phase-II Upgrade of the CMS Detector

    CERN Document Server

    CMS Collaboration; Contardo, D; Klute, M; Mans, J; Silvestris, L; Butler, J; CERN. Geneva. The LHC experiments Committee; LHCC

    2015-01-01

    This Technical Proposal presents the upgrades foreseen to prepare the CMS experiment for the High Luminosity LHC. In this second phase of the LHC physics program, the accelerator will provide to CMS an additional integrated luminosity of about 2500 fb-1 over 10 years of operation, starting in 2025. This will substantially enlarge the mass reach in the search for new particles and will also greatly extend the potential to study the properties of the Higgs boson discovered at the LHC in 2012. In order to meet the experimental challenges of unprecedented p-p luminosity, the CMS collaboration will need to address the aging of the present detector and to improve the ability of the apparatus to isolate and precisely measure the products of the most interesting collisions. This document describes the conceptual designs and the expected performance of the upgrades, along with the plans to develop the appropriate experimental techniques. The infrastructure upgrades and the logistics of the installation in the experim...

  15. Development of an ATCA IPMI Controller Mezzanine Board and its usage on an ATCA ROD Evaluator board for the ATLAS LAr upgrade

    CERN Document Server

    "DUMONT DAYOT, N; The ATLAS collaboration; "CAP, S; "DUMONT DAYOT, N; "FOURNIER, L; "LETENDRE, N; "PERROT, G; "Wingerter, I

    2011-01-01

    In the context of the LHC upgrades, a new Read-Out Driver (ROD) board for the ATLAS LAr calorimeter is being developed. xTCA (Advanced/Micro Telecom Computing Architecture) is becoming a standard in high energy physics and is a serious candidate for future readout systems. We will present our current developments to master ATCA and to integrate a large number of very high speed links (96 links/8.5 Gbps) on a ROD Evaluator ATCA board. To manage our ROD Evaluator, we have developed a versatile ATCA IPMI controller for ATCA boards which is FPGA Mezzanine Card (FMC) compliant.

  16. ALT-II armor tile design for upgraded TEXTOR operation

    International Nuclear Information System (INIS)

    Newberry, B.L.; McGrath, R.T.; Watson, R.D.

    1994-01-01

    The upgrade of the TEXTOR tokamak at KFA Julich will be completed in the spring of 1994. The upgrade will extend the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating systems are also scheduled to be upgraded so that eventually a total of 8.0 MW auxiliary heating will be available through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles on the full toroidal belt Advanced Limiter Test - II (ALT-II) were designed for 5-second operation with a total heating power of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto ALT-II by more than 300%. Consequently, the graphite armor tiles for ALT-II had to be redesigned in order to increase their thermal inertia and, thereby, avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. The armor tile thermal inertia had been increase primarily by expanding the radial thickness of the tiles from 17 mm to 20 mm. This increase in radial tile dimension will reduce the overall pumping efficiency of the ALT-II pump limiter by about 30%. The final armor tile design was a compromise between increasing the power handling capability and reducing the particle exhaust efficiency of ALT-II. The reduction in exhaust efficiency is unfortunate, but could only be avoided by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time

  17. Muon Physics at Run-I and its upgrade plan

    Directory of Open Access Journals (Sweden)

    Benekos Nektarios Chr.

    2015-01-01

    Full Text Available The Large Hadron Collider (LHC and its multi-purpose Detector, ATLAS, has been operated successfully at record centre-of-mass energies of 7 and TeV. After this successful LHC Run-1, plans are actively advancing for a series of upgrades, culminating roughly 10 years from now in the high luminosity LHC (HL-LHC project, delivering of order five times the LHC nominal instantaneous luminosity along with luminosity leveling. The final goal is to extend the data set from about few hundred fb−1 expected for LHC running to 3000 fb−1 by around 2030. To cope with the corresponding rate increase, the ATLAS detector needs to be upgraded. The upgrade will proceed in two steps: Phase I in the LHC shutdown 2018/19 and Phase II in 2023-25. The largest of the ATLAS Phase-1 upgrades concerns the replacement of the first muon station of the highrapidity region, the so called New Small Wheel. This configuration copes with the highest rates expected in Phase II and considerably enhances the performance of the forward muon system by adding triggering functionality to the first muon station. Prospects for the ongoing and future data taking are presented. This article presents the main muon physics results from LHC Run-1 based on a total luminosity of 30 fb^-1. Prospects for the ongoing and future data taking are also presented. We will conclude with an update of the status of the project and the steps towards a complete operational system, ready to be installed in ATLAS in 2018/19.

  18. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  19. The High-Luminosity upgrade of the LHC: Physics and Technology Challenges for the Accelerator and the Experiments

    Science.gov (United States)

    Schmidt, Burkhard

    2016-04-01

    In the second phase of the LHC physics program, the accelerator will provide an additional integrated luminosity of about 2500/fb over 10 years of operation to the general purpose detectors ATLAS and CMS. This will substantially enlarge the mass reach in the search for new particles and will also greatly extend the potential to study the properties of the Higgs boson discovered at the LHC in 2012. In order to meet the experimental challenges of unprecedented pp luminosity, the experiments will need to address the aging of the present detectors and to improve the ability to isolate and precisely measure the products of the most interesting collisions. The lectures gave an overview of the physics motivation and described the conceptual designs and the expected performance of the upgrades of the four major experiments, ALICE, ATLAS, CMS and LHCb, along with the plans to develop the appropriate experimental techniques and a brief overview of the accelerator upgrade. Only some key points of the upgrade program of the four major experiments are discussed in this report; more information can be found in the references given at the end.

  20. ATLAS Detector Upgrade Prospects

    International Nuclear Information System (INIS)

    Dobre, M

    2017-01-01

    After the successful operation at the centre-of-mass energies of 7 and 8 TeV in 2010-2012, the LHC was ramped up and successfully took data at the centre-of-mass energies of 13 TeV in 2015 and 2016. Meanwhile, plans are actively advancing for a series of upgrades of the accelerator, culminating roughly ten years from now in the high-luminosity LHC (HL-LHC) project, which will deliver of the order of five times the LHC nominal instantaneous luminosity along with luminosity levelling. The ultimate goal is to extend the dataset from about few hundred fb −1 expected for LHC running by the end of 2018 to 3000 fb −1 by around 2035 for ATLAS and CMS. The challenge of coping with the HL-LHC instantaneous and integrated luminosity, along with the associated radiation levels, requires further major changes to the ATLAS detector. The designs are developing rapidly for a new all-silicon tracker, significant upgrades of the calorimeter and muon systems, as well as improved triggers and data acquisition. ATLAS is also examining potential benefits of extensions to larger pseudorapidity, particularly in tracking and muon systems. This report summarizes various improvements to the ATLAS detector required to cope with the anticipated evolution of the LHC luminosity during this decade and the next. A brief overview is also given on physics prospects with a pp centre-of-mass energy of 14 TeV. (paper)

  1. Kongiganak Wind Turbine Replacement and System Upgrade Project

    Energy Technology Data Exchange (ETDEWEB)

    Boonstra, Patrick [Intelligent Energy Systems, Anchorage, AK (United States)

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  2. Advantages of viscodampers for NPPs upgrading

    International Nuclear Information System (INIS)

    Reinsch, K.H.; Schwahn, K.J.; Podrouzek, J.

    1993-01-01

    Viscodampers GERB are the ideal components for seismic upgrading of flexible pipework systems of the existing operating NPPs, of WWER-440 type, namely in primary reactor part. There are cheap, maintenance-free, simple and their installation minimizes the support forces to the structures. The quoted attests are enclosed in this paper. The references for application on Bohunice NPP upgrading are positive, and they are used in Mochovce and Temelin NPP as well

  3. The upgrade of the H.E.S.S. cameras

    Science.gov (United States)

    Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; Naurois, Mathieu de; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois

    2017-12-01

    The High Energy Stereoscopic System (HESS) is an array of imaging atmospheric Cherenkov telescopes (IACTs) located in the Khomas highland in Namibia. It was built to detect Very High Energy (VHE > 100 GeV) cosmic gamma rays. Since 2003, HESS has discovered the majority of the known astrophysical VHE gamma-ray sources, opening a new observational window on the extreme non-thermal processes at work in our universe. HESS consists of four 12-m diameter Cherenkov telescopes (CT1-4), which started data taking in 2002, and a larger 28-m telescope (CT5), built in 2012, which lowers the energy threshold of the array to 30 GeV . The cameras of CT1-4 are currently undergoing an extensive upgrade, with the goals of reducing their failure rate, reducing their readout dead time and improving the overall performance of the array. The entire camera electronics has been renewed from ground-up, as well as the power, ventilation and pneumatics systems, and the control and data acquisition software. Only the PMTs and their HV supplies have been kept from the original cameras. Novel technical solutions have been introduced, which will find their way into some of the Cherenkov cameras foreseen for the next-generation Cherenkov Telescope Array (CTA) observatory. In particular, the camera readout system is the first large-scale system based on the analog memory chip NECTAr, which was designed for CTA cameras. The camera control subsystems and the control software framework also pursue an innovative design, exploiting cutting-edge hardware and software solutions which excel in performance, robustness and flexibility. The CT1 camera has been upgraded in July 2015 and is currently taking data; CT2-4 have been upgraded in fall 2016. Together they will assure continuous operation of HESS at its full sensitivity until and possibly beyond the advent of CTA. This contribution describes the design, the testing and the in-lab and on-site performance of all components of the newly upgraded HESS

  4. High-luminosity LHC prospects with the upgraded ATLAS detector

    CERN Document Server

    Slawinska, Magdalena; The ATLAS collaboration

    2016-01-01

    Run-I at the LHC was very successful with the discovery of a new boson with properties compatible with those of the Higgs boson predicted by Standard Model. Precise measurements of the boson properties, and the discovery of physics beyond the Standard Model, are primary goals of the just restarted LHC running at 13 TeV collision energy and all future running at the LHC. The physics prospects with a pp centre-of-mass energy of 14 TeV are presented for 300 and 3000 fb-1 at the high-luminosity LHC. The ultimate precision attainable on measurements of the couplings of the 125 GeV boson to elementary fermions and bosons is discussed, as well as perspectives on the searches for partners associated with it. Supersymmetry is one of the best motivated extensions of the Standard Model. The current searches at the LHC have yielded sensitivity to TeV scale gluinos and 1st and 2nd generation squarks, as well as to 3rd generation squarks and electro-weakinos in the hundreds of GeV mass range. Benchmark studies are presente...

  5. Physics at HL-LHC with the upgraded ATLAS detector

    CERN Document Server

    Dell'Acqua, Andrea; The ATLAS collaboration

    2017-01-01

    The physics prospects at the luminosity upgrade of LHC, HL-LHC, with a data set equivalent to 3000 fb-1 simulated in the ATLAS detector, are presented and discussed. The ultimate precision attainable on measurements of 125 GeV Higgs boson couplings to elementary fermions and bosons is discussed, as well as the searches for partners associated with this new particle. The electroweak sector is further studied with the analysis of the vector boson scattering, testing the SM predictions at the LHC energy scale. Supersymmetry is still one of the best motivated extensions of the Standard Model. The current searches at the LHC have yielded sensitivity to TeV scale gluinos and 1st and 2nd generation squarks, as well as to 3rd generation squarks. The sensitivity to electro-weakinos has reached the hundreds of GeV mass range. Benchmark studies are presented to show how the sensitivity improves at the future high-luminosity LHC runs. Prospects for searches for new heavy bosons and dark matter candidates at 14 TeV pp col...

  6. Time accuracy requirements for fusion experiments: A case study at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Raupp, Gerhard; Behler, Karl; Eixenberger, Horst; Fitzek, Michael; Kollotzek, Horst; Lohs, Andreas; Lueddecke, Klaus; Mueller, Peter; Merkel, Roland; Neu, Gregor; Schacht, Joerg; Schramm, Gerold; Treutterer, Wolfgang; Zasche, Dieter; Zehetbauer, Thomas

    2010-01-01

    To manage and operate a fusion device and measure meaningful data an accurate and stable time is needed. As a benchmark, we suggest to consider time accuracy as sufficient if it is better than typical data errors or process timescales. This allows to distinguish application domains and chose appropriate time distribution methods. For ASDEX Upgrade a standard NTP method provides Unix time for project and operation management tasks, and a dedicated time system generates and distributes a precise experiment time for physics applications. Applying the benchmark to ASDEX Upgrade shows that physics measurements tagged with experiment time meet the requirements, while correlation of NTP tagged operation data with physics data tagged with experiment time remains problematic. Closer coupling of the two initially free running time systems with daily re-sets was an efficient and satisfactory improvement. For ultimate accuracy and seamless integration, however, continuous adjustment of the experiment time clock frequency to NTP is needed, within frequency variation limits given by the benchmark.

  7. Academic Training - LHC luminosity upgrade: detector challenges

    CERN Multimedia

    Françoise Benz

    2006-01-01

    ACADEMIC TRAINING LECTURE SERIES 13, 14, 15, March, from 11:00 to 12:00 - 16 March from 10:00 to 12:00 Main Auditorium, bldg. 500 on 14, 15 March, Council Room on 13, 16 March LHC luminosity upgrade: detector challenges A. De Roeck / CERN-PH, D. Bortoletto / Purdue Univ. USA, R. Wigmans / Texas, Tech Univ. USA, W. Riegler / CERN-PH, W. Smith / Wisconsin Univ. USA The upgrade of the LHC machine towards higher luminosity (1035 cm-2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector ...

  8. Safety of reactors built according to earlier standards (WWER 440/V230 type)

    International Nuclear Information System (INIS)

    Misak, J.; Rohar, S.

    1995-01-01

    The problems of safety of WWER-440/V-230 type reactors are discussed, and the following conclusions are made. (1) The reactors have a very good operational record. (2) The reactors have serious design shortcomings, which should be eliminated by safety upgrading. Core damage frequency should be further reduced. (3) PSA methods constitute an appropriate tool for assessment of plant vulnerability to some initiating events and malfunctions, for prioritization of upgrading measures and for tolerability of deviations from current safety standards. (4) The most important safety merits, such as a large thermal inertia and low rupture probability, should be properly taken into account in the analysis. (5) Extensive safety upgrading is feasible and can lead to a considerable risk reduction. In certain circumstances such upgrading is the least expensive option even though the total cost is much higher than the initial plant construction cost. (6) Properly upgraded, the reactor units may be operable until better power resources are available within the country. (7) The existing gap between the technological and political judgements of nuclear safety should be reduced continuously by information exchange improvements. (8) A unified approach to nuclear safety should be adopted for all nuclear reactors (not just WWERs) built to earlier standards. 5 tabs., 1 fig

  9. The front-end data conversion and readout electronics for the CMS ECAL upgrade

    CERN Document Server

    Mazza, Gianni

    2017-01-01

    The High Luminosity LHC (HL-LHC) will require a significant upgrade of the readout electronics for the CMS Electromagnetic Calorimeter (ECAL). The Very Front-End (VFE) output signal will be sampled at 160 MS/s (i.e. four times the current sampling rate) with 13 bit resolution. Therefore, a high-speed, high-resolution ADC is required. Moreover, each readout channel will produce 2.08 Gb/s, thus requiring fast data transmission circuitry. A new readout architecture, based on two 12 bit, 160 MS/s ADCs, lossless data compression algorithms and fast serial links have been developed for the ECAL upgrade. These functions will be integrated in a single ASIC which is currently under design in a commercial CMOS 65 nm technology using radiation damage mitigation techniques.

  10. Conceptual design of a 2 tesla superconducting solenoid for the Fermilab D{O} detector upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Brzezniak, J.; Fast, R.W.; Krempetz, K.

    1994-05-01

    This paper presents a conceptual design of a superconducting solenoid to be part of a proposed upgrade for the D0 detector. This detector was completed in 1992, and has been taking data since then. The Fermilab Tevatron had scheduled a series of luminosity enhancements prior to the startup of this detector. In response to this accelerator upgrade, efforts have been underway to design upgrades for D0 to take advantage of the new luminosity, and improvements in detector technology. This magnet is conceived as part of the new central tracking system for D0, providing a radiation-hard high-precision magnetic tracking system with excellent electron identification.

  11. Industrial Clusters and Social Upgrading in Developing Countries

    DEFF Research Database (Denmark)

    Pyke, Frank; Lund-Thomsen, Peter

    In this article, we explore the relationship between industrial clusters and social upgrading in developing countries. Our article focuses on the hitherto little-considered influence of the economic and regulatory environment on the social upgrading of a cluster and on its governance system....... In doing so, we develop an analytical framework that seeks to explain how the enabling environment and different actors in cluster governance can either facilitate and/or hinder the process of social upgrading in cluster settings in developing countries. Finally, the conclusion outlines our main findings...

  12. Upgrade of Instrumentation for Purdue Reactor PUR-1

    International Nuclear Information System (INIS)

    Revankar, S.T.; Merritt, E.; Bean, R.

    2000-01-01

    The major objective of this program was to upgrade and replace instruments and equipment that significantly improve the performance, control and operational capability of the Purdue University nuclear reactor (PUR-1). Under this major objective two projects on instrument upgrade were implemented. The first one was to convert the vacuum tube control and safety amplifiers (CSA) to solid state electronics, and the other was to upgrade the electrical and electronic shielding. This report is the annual report and gives the efforts and progress achieved on these two projects from July 1999 to June 2000

  13. Silicon strip detectors for the ATLAS HL-LHC upgrade

    CERN Document Server

    Gonzalez Sevilla, S; The ATLAS collaboration

    2011-01-01

    The LHC upgrade is foreseen to increase the ATLAS design luminosity by a factor ten, implying the need to build a new tracker suited to the harsh HL-LHC conditions in terms of particle rates and radiation doses. In order to cope with the increase in pile-up backgrounds at the higher luminosity, an all silicon detector is being designed. To successfully face the increased radiation dose, a new generation of extremely radiation hard silicon detectors is being designed. We give an overview of the ATLAS tracker upgrade project, in particular focusing on the crucial innermost silicon strip layers. Results from a wide range of irradiated silicon detectors for the strip region of the future ATLAS tracker are presented. Layout concepts for lightweight yet mechanically very rigid detector modules with high service integration are shown.

  14. Engineering task plan for BX/BY compressor upgrade

    International Nuclear Information System (INIS)

    Strand, R.G.

    1995-01-01

    This Engineering Task Plan outlines the remaining work to be completed for the BX/BY Instrument Air upgrade. Initial work efforts were guided by Engineering Work Plan, ''BX-BY Compressor Upgrade'' dated 1-25-93 (see Attachment A) which is provided for information. The overall engineering task is to provide a permanent replacement for the instrument air supply system for the 241-BX/BY Tank Farms. The existing system consists of a 25 horsepower Worthington non-lube compressor and an Oriad air dryer. The existing equipment is dated, requires high maintenance and is located in a contaminated zone making it unusable. The BX/BY instrument air replacement unit will be one of the 100 SCFM generic air stations. This station will be permanently sited with the addition of drawing changes to provide a concrete foundation, air piping to existing lines and electrical power supply tie-ins

  15. LHCb DAQ network upgrade tests

    CERN Document Server

    Pisani, Flavio

    2013-01-01

    My project concerned the evaluation of new technologies for the DAQ network upgrade of LHCb. The first part consisted in developing and Open Flow-based Clos network. This new technology is very interesting and powerful but, as shown by the results, it still needs further improvements. The second part consisted in testing and benchmarking 40GbE network equipment: Mellanox MT27500, Chelsio T580 and Huawei Cloud Engine 12804. An event-building simulation is currently been performed in order to check the feasibility of the DAQ network upgrade in LS2. The first results are promising.

  16. Development of Trigger and Readout Electronics for the ATLAS New Small Wheel Detector Upgrade

    CERN Document Server

    Zhu, Junjie; The ATLAS collaboration

    2017-01-01

    The planned Phase-I and Phase-II upgrades of the LHC accelerator drastically impacts the ATLAS trigger and trigger rates. A replacement of the ATLAS innermost endcap muon station with a new small wheel (NSW) detector is planned for the second long shutdown period of 2019 - 2020. This upgrade will allow us to maintain a low pT threshold for single muon and excellent tracking capability even after the High-Luminosity LHC upgrade. The NSW detector will feature two new detector technologies, Resistive Micromegas and small-strip Thin Gap Chambers. Both detector technologies will provide trigger and tracking primitives. The total number of trigger and readout channels is about 2.4 millions, and the overall power consumption is expected to be about 75 kW. The electronics design will be implemented in some 8000 front-end boards including the design of four custom front-end ASICs capable to drive trigger and tracking primitives with high speed sterilizers to drive trigger candidates to the backend trigger processor sy...

  17. Status of the University of Missouri-Columbia Research Reactor upgrade

    International Nuclear Information System (INIS)

    McKibben, J.C.; Edwards, C.B. Jr.; Meyer, W.A. Jr.; Kim, S.S.

    1990-01-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  18. Status of the University of Missouri-Columbia Research Reactor upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Edwards, Jr, C B; Meyer, Jr, W A [MU Research Reactor, Columbia, MO (United States); Kim, S S [Idaho Nuclear Engineering Laboratory, Idaho Falls, ID (United States)

    1990-05-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  19. Superhilac upgrade project

    International Nuclear Information System (INIS)

    Feinberg, B.; Brown, I.G.

    1985-05-01

    This project will increase the uranium output of the Bevalac heavy-ion facility from the currently available 10 7 to 5 x 10 7 ions/pulse, allowing accurate Lamb shift measurements to be made in U 90+ and U 91+ with important applications to the testing of quantum electrodynamics and the development of an x-ray laser. The injected beam intensity will be increased to make better use of the 10emA output space-charge limit of the Wideroe linac. Components will include a new high current MEtal Vapor Vacuum Arc (MEVVA) ion source along with an improved high current, high voltage Cockcroft-Walton power supply to handle the increased beam current. The Low Energy Beam Transport (LEBT) line will be upgraded with additional focusing to manage the increased space-charge forces and with an improved vacuum to reduce charge exchange losses. Finally, the phase matching between the 23MHz Wideroe linac and the 70MHz Alvarez linac will be improved by the addition of the appropriate buncher cavities. Physics design is underway and detailed engineering is scheduled to begin in October 1985, with installation slated for the 1986 summer shutdown

  20. Standards for radiation protection instrumentation: design of safety standards and testing procedures

    International Nuclear Information System (INIS)

    Meissner, Frank

    2008-01-01

    This paper describes by means of examples the role of safety standards for radiation protection and the testing and qualification procedures. The development and qualification of radiation protection instrumentation is a significant part of the work of TUV NORD SysTec, an independent expert organisation in Germany. The German Nuclear Safety Standards Commission (KTA) establishes regulations in the field of nuclear safety. The examples presented may be of importance for governments and nuclear safety authorities, for nuclear operators and for manufacturers worldwide. They demonstrate the advantage of standards in the design of radiation protection instrumentation for new power plants, in the upgrade of existing instrumentation to nuclear safety standards or in the application of safety standards to newly developed equipment. Furthermore, they show how authorities may proceed when safety standards for radiation protection instrumentation are not yet established or require actualization. (author)