  1. System upgrades to the DIII-D facility

    International Nuclear Information System (INIS)

    Kellman, A.G.

    2007-01-01

    Major upgrades to the DIII-D facility have been performed that significantly enhance the capability of both the DIII-D device and the entire facility. The most significant of these include the rotation of a neutral beam line, installation of a new lower divertor, and a significant set of new and enhanced diagnostics. The upgrades and initial results are presented in this paper

  2. Preliminary business plan: Plzen district heating system upgrade

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-06-01

    The district heating system of the City of Plzen, Czech Republic, needs to have physical upgrades to replace aging equipment and to comply with upcoming environmental regulations. Also, its ownership and management are being changed as a result of privatization. As majority owner, the City has the primary goal of ensuring that the heating needs of its customers are met as reliably and cost-effectively as possible. This preliminary business plan is part of the detailed analysis (5 reports in all) done to assist the City in deciding the issues. Preparation included investigation of ownership, management, and technology alternatives; estimation of market value of assets and investment requirements; and forecasting of future cash flow. The district heating system consists of the Central Plzen cogeneration plant, two interconnected heating plants [one supplying both hot water and steam], three satellite heating plants, and cooperative agreements with three industrial facilities generating steam and hot water. Most of the plants are coal-fired, with some peaking units fired by fuel oil.

  3. Design of the PISCES-Upgrade facility

    International Nuclear Information System (INIS)

    Waganer, L.M.; Doerner, R.

    1994-01-01

    The PISCES-Upgrade facility is currently in the design and fabrication phases for the University of California. McDonnell Douglas is under contract to develop this experimental facility in order to enhance the capability for investigation of fusion materials erosion-redeposition and edge plasma behaviors. The advance in facility capability requires innovative design approaches and application of sophisticated analysis techniques

  4. Upgrades of Hanford Engineering Development Laboratory hot cell facilities

    International Nuclear Information System (INIS)

    Daubert, R.L.; DesChane, D.J.

    1987-01-01

    The Hanford Engineering Development Laboratory operates the 327 Postirradiation Testing Laboratory (PITL) and the 324 Shielded Materials Facility (SMF). These hot cell facilities provide diverse capabilities for the postirradiation examination and testing of irradiated reactor fuels and materials. The primary function of these facilities is to determine failure mechanisms and effects of irradiation on physical and mechanical properties of reactor components. The purpose of this paper is to review major equipment and facility upgrades that enhance customer satisfaction and broaden the engineering capabilities for more diversified programs. These facility and system upgrades are providing higher quality remote nondestructive and destructive examination services with increased productivity, operator comfort, and customer satisfaction

  5. The upgrading of the cyclic neutron activation analysis facility at the Dalat research reactor

    International Nuclear Information System (INIS)

    Van Doanh Ho; Manh Dung Ho; Quang Thien Tran; Dong Vu Cao; Thanh Viet Ha

    2018-01-01

    The cyclic neutron activation analysis (CNAA) facility based on a pneumatic transfer system for short irradiation and rapid counting has recently been upgraded at the Dalat research reactor. The original facility was only designed for single irradiation. Therefore, this work has aimed to upgrade both hardware and software for the cyclic irradiation. In this paper, the upgrading of the facility for CNAA was described. Irradiation time of the facility were calibrated, thereby reducing irradiation time to seconds with precision. The accuracy and sensitivity of CNAA based-on the upgraded facility were assessed by determination of some short-lived nuclides. (author)

  6. Experiences with tungsten coatings in high heat flux tests and under plasma load in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Herrmann, A; Greuner, H; Fuchs, J C; Marne, P de; Neu, R

    2009-01-01

    ASDEX Upgrade was operated with about 6400 s plasma discharge during the scientific program in 2007/2008 exploring tungsten as a first wall material in tokamaks. In the first phase, the heating power was restricted to 10 MW. It was increased to 15 MW in the second phase. During this operational period, a delamination of the 200 μm W-VPS coating happened at 2 out of 128 tiles of the outer divertor and an unscheduled opening was required. In the third phase, ASDEX Upgrade was operated with partly predamaged tiles and up to 15 MW heating power. The target load was actively controlled by N 2 -seeding. This paper presents the screening test of target tiles in the high heat flux test facility GLADIS, experiences with operation and detected damages of the outer divertor as well as the heat load to the outer divertor and the reasons for the toroidal asymmetry of the divertor load.

  7. Upgrading safety systems of industrial irradiation facilities

    International Nuclear Information System (INIS)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L.; Thomé, Z.D.

    2017-01-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  8. Upgrading safety systems of industrial irradiation facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gomes, R.S.; Gomes, J.D.R.L.; Costa, E.L.C.; Costa, M.L.L., E-mail: rogeriog@cnen.gov.br, E-mail: jlopes@cnen.gov.br, E-mail: evaldo@cnen.gov.br, E-mail: mara@cnen.gov.br [Comissão Nacional de Energia Nuclear (CNEN), Rio de Janeiro, RJ (Brazil). Diretoria de Radioproteção e Segurança Nuclear; Thomé, Z.D., E-mail: zielithome@gmail.com [Instituto Militar de Engenharia (IME), Rio de Janeiro, RJ (Brazil). Seção de Engenharia Nuclear

    2017-07-01

    The first industrial irradiation facility in operation in Brazil was designed in the 70s. Nowadays, twelve commercial and research facilities are in operation and two already decommissioned. Minor modifications and upgrades, as sensors replacement, have been introduced in these facilities, in order to reduce the technological gap in the control and safety systems. The safety systems are designed in agreement with the codes and standards at the time. Since then, new standards, codes and recommendations, as well as lessons learned from accidents, have been issued by various international committees or regulatory bodies. The rapid advance of the industry makes the safety equipment used in the original construction become obsolete. The decreasing demand for these older products means that they are no longer produced, which can make it impossible or costly to obtain spare parts and the expansion of legacy systems to include new features. This work aims to evaluate existing safety systems at Brazilian irradiation facilities, mainly the oldest facilities, taking into account the recommended IAEA's design requirements. Irrespective of the fact that during its operational period no event with victims have been recorded in Brazilian facilities, and that the regulatory inspections do not present any serious deviations regarding the safety procedures, it is necessary an assessment of safety system with the purpose of bringing their systems to 'the state of the art', avoiding their rapid obsolescence. This study has also taken into account the knowledge, concepts and solutions developed to upgrading safety system in irradiation facilities throughout the world. (author)

  9. Design of A District Heating System Including The Upgrading of Residual Industrial Waste Heat

    NARCIS (Netherlands)

    Falcao, P.W.; Mesbah, A.; Suherman, M.V.; Wennekes, S.

    2005-01-01

    This study was aimed to evaluate the feasibility of using a waste heat stream from DSM for a District Heating System. A conceptual design was carried out with emphasis on the unit for upgrading the residual waste heat. Having reviewed heat pump technology, mechanical heat pump was found to be the

  10. Fusion technology development: role of fusion facility upgrades and fission test reactors

    International Nuclear Information System (INIS)

    Hsu, P.Y.; Deis, G.A.; Longhurst, G.R.; Miller, L.G.; Schmunk, R.E.

    1983-01-01

    The near term national fusion program is unlikely to follow the aggressive logic of the Fusion Engineering Act of 1980. Faced with level budgets, a large, new fusion facility with an engineering thrust is unlikely in the near future. Within the fusion community the idea of upgrading the existing machines (TFTR, MFTF-B) is being considered to partially mitigate the lack of a design data base to ready the nation to launch an aggressive, mission-oriented fusion program with the goal of power production. This paper examines the cost/benefit issues of using fusion upgrades to develop the technology data base which will be required to support the design and construction of the next generation of fusion machines. The extent of usefulness of the nation's fission test reactors will be examined vis-a-vis the mission of the fusion upgrades. The authors show that while fission neutrons will provide a useful test environment in terms of bulk heating and tritium breeding on a submodule scale, they can play only a supporting role in designing the integrated whole modules and systems to be used in a nuclear fusion machine

  11. Fusion technology development: role of fusion facility upgrades and fission test reactors

    International Nuclear Information System (INIS)

    Hsu, P.Y.; Deis, G.A.; Miller, L.G.; Longhurst, G.R.; Schmunk, R.E.

    1983-01-01

    The near term national fusion program is unlikely to follow the aggressive logic of the Fusion Engineering Act of 1980. Faced with level budgets, a large, new fusion facility with an engineering thrust is unlikely in the near future. Within the fusion community the idea of upgrading the existing machines (TFTR, MFTF-B) is being considered to partially mitigate the lack of a design data base to ready the nation to launch an aggressive, mission-oriented fusion program with the goal of power production. This paper examines the cost/benefit issues of using fusion upgrades to develop the technology data base which will be required to support the design and construction of the next generation of fusion machines. The extent of usefulness of the nation's fission test reactors will be examined vis-a-vis the mission of the fusion upgrades. We will show that while fission neutrons will provide a useful test environment in terms of bulk heating and tritium breeding on a submodule scale, they can play only a supporting role in designing the integrated whole modules and systems to be used in a nuclear fusion machine

  12. Upgrades to meet LANL SF, 121-2011, hazardous waste facility permit requirements

    International Nuclear Information System (INIS)

    French, Sean B.; Johns-Hughes, Kathryn W.

    2011-01-01

    Members of San IIdefonso have requested information from LANL regarding implementation of the revision to LANL's Hazardous Waste Facility Permit (the RCRA Permit). On January 26, 2011, LANL staff from the Waste Disposition Project and the Environmental Protection Division will provide a status update to Pueblo members at the offices of the San IIdefonso Department of Environmental and Cultural Preservation. The Waste Disposition Project presentation will focus on upgrades and improvements to LANL waste management facilities at TA-50 and TA-54. The New Mexico Environment Department issued LANL's revised Hazardous Waste Facility permit on November 30, 2010 with a 30-day implementation period. The Waste Disposition Project manages and operates four of LANL's permitted facilities; the Waste Characterization, Reduction and Repackaging Facility (WCRRF) at TA-SO, and Area G, Area L and the Radioassay and Nondestructive Testing facility (RANT) at TA-54. By implementing a combination of permanent corrective action activities and shorter-term compensatory measures, WDP was able to achieve functional compliance on December 30, 2010 with new Permit requirements at each of our facilities. One component of WOP's mission at LANL is centralized management and disposition of the Laboratory's hazardous and mixed waste. To support this mission objective, WOP has undertaken a project to upgrade our facilities and equipment to achieve fully compliant and efficient waste management operations. Upgrades to processes, equipment and facilities are being designed to provide defense-in-depth beyond the minimum, regulatory requirements where worker safety and protection of the public and the environment are concerned. Upgrades and improvements to enduring waste management facilities and operations are being designed so as not to conflict with future closure activities at Material Disposal Area G and Material Disposal Area L.

  13. Overview of the TCV tokamak program: scientific progress and facility upgrades

    DEFF Research Database (Denmark)

    Coda, S.; Ahn, J.; Albanese, R.

    2017-01-01

    The TCV tokamak is augmenting its unique historical capabilities (strong shaping, strong electron heating) with ion heating, additional electron heating compatible with high densities, and variable divertor geometry, in a multifaceted upgrade program designed to broaden its operational range with...

  14. Overview of the TCV tokamak program : scientific progress and facility upgrades

    NARCIS (Netherlands)

    Coda, S.; Ahn, J.; Albanese, R.; Alberti, S.; Alessi, E.; Allan, S.; Anand, H.; Anastassiou, G.; Andrèbe, Y.; Angioni, C.; Ariola, M.; Bernert, M.; Beurskens, M.N.A.; Bin, W.; Blanchard, P.; Blanken, T.C.; Boedo, J.A.; Bolzonella, T.; Bouquey, F.; Braunmüller, F.H.; Bufferand, H.; Buratti, P.; Calabró, G.; Camenen, Y.; Carnevale, D.; Carpanese, F.; Causa, F.; Cesario, R.; Chapman, I.T.; Chellai, O.; Choi, D.; Cianfarani, C.; Ciraolo, G.; Citrin, J.; Costea, S.; Crisanti, F.; Cruz, N.; Czarnecka, A.; Decker, J.; De Masi, G.; De Tommasi, G.; Douai, D.; Dunne, M.; Duval, B.P.; Eich, T.; Elmore, S.; Esposito, B.; Faitsch, M.; Fasoli, A.; Fedorczak, N.; Felici, F.; Février, O.; Ficker, O.; Fietz, S.; Fontana, M.; Frassinetti, L.; Furno, I.; Galeani, S.; Gallo, A.; Galperti, C.; Garavaglia, S.; Garrido, I.; Geiger, B.; Giovannozzi, E.; Gobbin, M.; Goodman, T.P.; Gorini, G.; Gospodarczyk, M.; Granucci, G.; Graves, J.P.; Guirlet, R.; Hakola, A.; Ham, C.; Harrison, J.; Hawke, J.; Hennequin, P.; Hnat, B.; Hogeweij, D.; Hogge, J.- P.; Honoré, C.; Hopf, C.; Horáček, J.; Huang, Z.; Igochine, V.; Innocente, P.; Ionita-Schrittwieser, C.; Isliker, H.; Jacquier, R.; Jardin, A.; Kamleitner, J.; Karpushov, A.; Keeling, D.L.; Kirneva, N.; Kong, M.; Koubiti, M.; Kovacic, J.; Krämer-Flecken, A.; Krawczyk, N.; Kudlacek, O.; Labit, B.; Lazzaro, E.; Le, H.B.; Lipschultz, B.; Llobet, X.; Lomanowski, B.; Loschiavo, V.P.; Lunt, T.; Maget, P.; Maljaars, E.; Malygin, A.; Maraschek, M.; Marini, C.; Martin, P.; Martin, Y.; Mastrostefano, S.; Maurizio, R.; Mavridis, M.; Mazon, D.; McAdams, R.; McDermott, R.; Merle, A.; Meyer, H.; Militello, F.; Miron, I.G.; Molina Cabrera, P.A.; Moret, J.M.; Moro, A.; Moulton, D.; Naulin, V.; Nespoli, F.; Nielsen, A.H.; Nocente, M.; Nouailletas, R.; Nowak, S.; Odstrčil, T.; Papp, G.; Papřok, R.; Pau, A.; Pautasso, G.; Pericoli Ridolfini, V.; Piovesan, P.; Piron, C.; Pisokas, T.; Porte, L.; Preynas, M.; Ramogida, G.; Rapson, C.; Rasmussen, J.J.; Reich, M.; Reimerdes, H.; Reux, C.; Ricci, P.; Rittich, D.; Riva, F.; Robinson, T.; Saarelma, S.; Saint-Laurent, F.; Sauter, O.; Scannell, R.; Schlatter, Ch.; Schneider, B.; Schneider, P.; Schrittwieser, R.; Sciortino, F.; Sertoli, M.; Sheikh, U.; Sieglin, B.; Silva, M.; Sinha, J.; Sozzi, C.; Spolaore, M.; Stange, T.; Stoltzfus-Dueck, T.; Tamain, P.; Teplukhina, A.; Testa, D.; Theiler, C.; Thornton, A.; Tophøj, L.; Tran, M.Q.; Tsironis, C.; Tsui, C.; Uccello, A.; Vartanian, S.; Verdoolaege, G.; Verhaegh, K.H.A.; Vermare, L.; Vianello, N.; Vijvers, W.A.J.; Vlahos, L.; Vu, N.M.T.; Walkden, N.; Wauters, T.; Weisen, H.; Wischmeier, M.; Zestanakis, P.; Zuin, M.

    2017-01-01

    The TCV tokamak is augmenting its unique historical capabilities (strong shaping, strong electron heating) with ion heating, additional electron heating compatible with high densities, and variable divertor geometry, in a multifaceted upgrade program designed to broaden its operational range without

  15. Development of thermo-plastic heating and compaction facility

    International Nuclear Information System (INIS)

    Ko, Dae Hak; Lim, Suk Nam

    1998-01-01

    Low- and intermediate-level radioactive wastes consist of spent resin, spent filter, concentrated waste and dry active waste(DAW) and they are solidified or packaged into drums or high integrated containers(HICs). DAWs occupy 50 percent of all low- and intermediate-level radioactive wastes generated from nuclear power plants in Korea. Incinerable wastes in the DAWs are about 60 percent. Therefore, it is very important for us to reduce the volume of incinerable wastes in DAWs. Experience of supercompaction turned out that thermo-plastic wastes have a swelling effect after supercompaction process due to their repulsive power. And the thermo-plastic heating and compaction facility has been developed by KEPCO. In conclusion, heating and compaction facility can reduce the volume of DAWs as well as upgrade the quality of treated wastes, because the swelling effect by repulsive power after compaction is removed, final wastes form the shape of block and they have no free-standing water in the wastes. Plan for practical use is that this facility will be installed in other nuclear power plants in Korea in 1999. (Cho, G. S.). 1 tab., 2 figs

  16. Upgraded Features of Newly Constructed Fuel Assembly Mechanical Characterization Test Facility in KAERI

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kang Hee; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Lee, Young Ho; Kim, Soo Ho; Yang, Jae Ho [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Fuel assembly mechanical characterization test facility (FAMeCT) in KAERI is newly constructed with upgraded functional features such as increased loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. The facility building is compactly designed in the scale of 3rd floor building and has regions for assembly-wise mechanical test equipment, dynamic load (seismic) simulating test system, small scale hydraulic loop and component wise test equipment. Figure 1 shows schematic regional layout of the facility building. Mechanical test platform and system is designed to increase loading capacity for axial compression test. Structural stability of the support system of new upper core plate simulator is validated through a limit case functional test. Fuel assembly mechanical characterization test facility in KAERI is newly constructed and upgraded with advanced functional features such as uprated loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. This paper briefly introduce the test facility construction and scope of the facility and is focused on the upgraded design features of the facility. Authors hope to facilitate the facility more in the future and collaborate with the industry.

  17. Nuclear heating in thick iron slabs at the ORR Pool Side Facility

    International Nuclear Information System (INIS)

    Siman-Tov, I.I.

    1979-01-01

    The purpose of this work was to determine experimentally and computationally the nuclear heating rates in iron in the Pool Side Facility (PSF) of the Oak Ridge Research Reactor (ORR). This work was performed in support of the NRC-Pressure Vessel Surveillance Program, the objective of which is to verify and upgrade dosimetry and damage correlations for pressure vessels of Light Water Reactors

  18. Operational test report, integrated system test (ventilation upgrade)

    International Nuclear Information System (INIS)

    HARTY, W.M.

    1999-01-01

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, AY102, AZ101, AZ102

  19. Operational test report integrated system test (ventilation upgrade)

    Energy Technology Data Exchange (ETDEWEB)

    HARTY, W.M.

    1999-10-05

    Operational Final Test Report for Integrated Systems, Project W-030 (Phase 2 test, RECIRC and HIGH-HEAT Modes). Project W-030 provides a ventilation upgrade for the four Aging Waste Facility tanks, including upgraded vapor space cooling and filtered venting of tanks AY101, Ay102, AZ101, AZ102.

  20. Directions for possible upgrades of the Mirror Fusion Test Facility (MFTF)

    International Nuclear Information System (INIS)

    Damm, C.C.; Coensgen, F.H.; Devoto, R.S.; Molvik, A.W.; Porter, G.D.; Shearer, J.W.; Stallard, B.W.

    1977-01-01

    The Mirror Fusion Test Facility (MFTF) may be upgraded by extending the time of plasma sustenance in an approach to steady-state operation and/or by increasing the neutral-beam injection energy. Some parameter bounds for these upgrades are discussed as they relate to a definition of the required neutral-beam development

  1. Role of fuel upgrading for industry and residential heating

    Energy Technology Data Exchange (ETDEWEB)

    Merriam, N.W. [Western Research Inst., Laramie, WY (United States); Gentile, R.H. [KFx Atlantic Partners, Arlington, VA (United States)

    1995-12-01

    The Koppleman Series C Process is presently being used in pilot plant tests with Wyoming coal to upgrade the Powder River Basin coal containing 30 wt% moisture and having a heating value of 8100 Btu/lb to a product containing less than 1 wt% moisture and having a heating value of 12,200 Btu/lb. This process is described.

  2. Upgrade of the BATMAN test facility for H- source development

    Science.gov (United States)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  3. Upgrade of the BATMAN test facility for H− source development

    International Nuclear Information System (INIS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-01-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called “Large Area Grid” (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame

  4. Upgrade of the Los Alamos Plutonium Facility control system

    International Nuclear Information System (INIS)

    Pope, N.G.; Turner, W.J.; Brown, R.E.; Bibeau, R.A.; Davis, R.R.; Hogan, K.

    1996-01-01

    After 20 yrs service, the Los Alamos Plutonium Facility is undergoing an upgrade to its aging Facility Control System. The new system design includes a network of redundantly-paired programmable logic controllers that will interface with about 2200 field data points. The data communications network that has been designed includes a redundant, self-healing fiber optic data highway as well as a fiber optic ethernet. Commercially available human-machine interface software running on a UNIX-based system displays facility subsystem status operator X-terminals. Project design features, methods, costs, and schedule are discussed

  5. Nova Upgrade: A proposed ICF facility to demonstrate ignition and gain, revision 1

    Science.gov (United States)

    1992-07-01

    The present objective of the national Inertial Confinement Fusion (ICF) Program is to determine the scientific feasibility of compressing and heating a small mass of mixed deuterium and tritium (DT) to conditions at which fusion occurs and significant energy is released. The potential applications of ICF will be determined by the resulting fusion energy yield (amount of energy produced) and gain (ratio of energy released to energy required to heat and compress the DT fuel). Important defense and civilian applications, including weapons physics, weapons effects simulation, and ultimately the generation of electric power will become possible if yields of 100 to 1,000 MJ and gains exceeding approximately 50 can be achieved. Once ignition and propagating bum producing modest gain (2 to 10) at moderate drive energy (1 to 2 MJ) has been achieved, the extension to high gain (greater than 50) is straightforward. Therefore, the demonstration of ignition and modest gain is the final step in establishing the scientific feasibility of ICF. Lawrence Livermore National Laboratory (LLNL) proposes the Nova Upgrade Facility to achieve this demonstration by the end of the decade. This facility would be constructed within the existing Nova building at LLNL for a total cost of approximately $400 M over the proposed FY 1995-1999 construction period. This report discusses this facility.

  6. Upgrade of the Cryogenic CERN RF Test Facility

    CERN Document Server

    Pirotte, O; Brunner, O; Inglese, V; Koettig, T; Maesen, P; Vullierme, B

    2014-01-01

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented.

  7. Upgrade of the cryogenic CERN RF test facility

    International Nuclear Information System (INIS)

    Pirotte, O.; Benda, V.; Brunner, O.; Inglese, V.; Maesen, P.; Vullierme, B.; Koettig, T.

    2014-01-01

    With the large number of superconducting radiofrequency (RF) cryomodules to be tested for the former LEP and the present LHC accelerator a RF test facility was erected early in the 1990’s in the largest cryogenic test facility at CERN located at Point 18. This facility consisted of four vertical test stands for single cavities and originally one and then two horizontal test benches for RF cryomodules operating at 4.5 K in saturated helium. CERN is presently working on the upgrade of its accelerator infrastructure, which requires new superconducting cavities operating below 2 K in saturated superfluid helium. Consequently, the RF test facility has been renewed in order to allow efficient cavity and cryomodule tests in superfluid helium and to improve its thermal performances. The new RF test facility is described and its performances are presented

  8. Upgrading primary heat transport pump seals

    International Nuclear Information System (INIS)

    Graham, T.; Metcalfe, R.; Rhodes, D.; McInnes, D.

    1995-01-01

    Changes in the operating environment at the Bruce-A Nuclear Generating Station created the need for an upgraded Primary Heat Transport Pump (PHTP) seal. In particular, the requirement for low pressure running during more frequent start-ups exposed a weakness of the CAN2 seal and reduced its reliability. The primary concern at Bruce-A was the rotation of the CAN2 No. 2 stators in their holders. The introduction of low pressure running exacerbated this problem, giving rapid wear of the stator back face, overheating, and thermocracking. In addition, the resulting increase in friction between the stator and its holder increased stationary-side hysteresis and thereby changed the seal characteristic to the point where interseal pressure oscillations became prevalent. The resultant increased hysteresis also led to hard rubbing of the seal faces during temperature transients. An upgraded seal was required for improved reliability to avoid forced outages and to reduce maintenance costs. This paper describes this upgraded 'replacement seal' and its performance history. In spite of the 'teething' problems detailed in this paper, there have been no forced outages due to the replacement seal, and in the words of a seal maintenance worker at Bruce-A, 'it allows me to go home and sleep at night instead of worrying about seal failures.' (author)

  9. Facilities upgrade for natural forces: traditional vs. realistic approach

    International Nuclear Information System (INIS)

    Terkun, V.

    1985-01-01

    The traditional method utilized for upgrading existing buildings and equipment involves the following steps: performs structural study using finite element analysis and some in situ testing; compare predicted member forces/stresses to material code allowables; determine strengthening schemes for those structural members judged to be weak; estimate cost for required upgrades. This approach will result in structural modifications that are not only conservative but very expensive as well. The realistic structural evaluation approach uses traditional data to predict structural weaknesses as a final step. Next, using considerable information now available for buildings and equipment exposed to natural hazards, engineering judgments about structures being evaluated can be made with a great deal of confidence. This approach does not eliminate conservatism entirely, but it does reduce it to a reasonable and realistic level. As a result, the upgrade cost goes down without compromising the low risk necessary for vital facilities

  10. Results of high heat flux tests and structural analysis of the new solid tungsten divertor tile for ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Jaksic, Nikola, E-mail: nikola.jaksic@ipp.mpg.de; Greuner, Henri; Herrmann, Albrecht; Böswirth, Bernd; Vorbrugg, Stefan

    2015-10-15

    Highlights: • The main motivation for the HHF investigation of tungsten tiles was an untypical deformation of some specimens under thermal loading, observed during the previous tests in GLADIS test facility. • A nonlinear finite element (FE) model for simulations of the GLADIS tests has been built. • The unexpected plastic deformations are mainly caused by internal stresses due to the manufacturing process. The small discrepancies among the FEA investigated and measured plastic deformations are most likely caused, beside of the practical difficulties by measuring of low items, also by tile internal stresses. • The influences of the residual stresses caused by special production processes have to be taken into account by design of the structural part made of solid tungsten. - Abstract: Tungsten as plasma-facing material for fusion devices is currently the most favorable candidate. In general solid tungsten is used for shielding the plasma chamber interior against the high heat generated from the plasma. For the purposes of implementation at ASDEX Upgrade and as a contribution to ITER the thermal performance of tungsten tiles has been extensively tested in the high heat flux test facility GLADIS during the development phase and beyond. These tests have been performed on full scale tungsten tile prototypes including their clamping and cooling structure. Simulating the adiabatically thermal loading due to plasma operation in ASDEX Upgrade, the tungsten tiles have been subjected to a thermal load with central heat flux of 10–24 MW/m{sup 2} and absorbed energy between 370 and 680 kJ. This loading results in maximum surface temperatures between 1300 °C and 2800 °C. The tests in GLADIS have been accompanied by intensive numerical investigations using FEA methods. For this purpose a multiple nonlinear finite element model has been set up. This paper discusses the main results of the high heat flux final tests and their numerical simulation. Moreover, first

  11. Results of high heat flux tests and structural analysis of the new solid tungsten divertor tile for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Jaksic, Nikola; Greuner, Henri; Herrmann, Albrecht; Böswirth, Bernd; Vorbrugg, Stefan

    2015-01-01

    Highlights: • The main motivation for the HHF investigation of tungsten tiles was an untypical deformation of some specimens under thermal loading, observed during the previous tests in GLADIS test facility. • A nonlinear finite element (FE) model for simulations of the GLADIS tests has been built. • The unexpected plastic deformations are mainly caused by internal stresses due to the manufacturing process. The small discrepancies among the FEA investigated and measured plastic deformations are most likely caused, beside of the practical difficulties by measuring of low items, also by tile internal stresses. • The influences of the residual stresses caused by special production processes have to be taken into account by design of the structural part made of solid tungsten. - Abstract: Tungsten as plasma-facing material for fusion devices is currently the most favorable candidate. In general solid tungsten is used for shielding the plasma chamber interior against the high heat generated from the plasma. For the purposes of implementation at ASDEX Upgrade and as a contribution to ITER the thermal performance of tungsten tiles has been extensively tested in the high heat flux test facility GLADIS during the development phase and beyond. These tests have been performed on full scale tungsten tile prototypes including their clamping and cooling structure. Simulating the adiabatically thermal loading due to plasma operation in ASDEX Upgrade, the tungsten tiles have been subjected to a thermal load with central heat flux of 10–24 MW/m"2 and absorbed energy between 370 and 680 kJ. This loading results in maximum surface temperatures between 1300 °C and 2800 °C. The tests in GLADIS have been accompanied by intensive numerical investigations using FEA methods. For this purpose a multiple nonlinear finite element model has been set up. This paper discusses the main results of the high heat flux final tests and their numerical simulation. Moreover, first results

  12. NASA Glenn's Single-Stage Axial Compressor Facility Upgraded

    Science.gov (United States)

    Brokopp, Richard A.

    2004-01-01

    NASA Glenn Research Center's Single-Stage Axial Compressor Facility was upgraded in fiscal year 2003 to expand and improve its research capabilities for testing high-speed fans and compressors. The old 3000-hp drive motor and gearbox were removed and replaced with a refurbished 7000-hp drive motor and gearbox, with a maximum output speed of 21,240 rpm. The higher horsepower rating permits testing of fans and compressors with higher pressure ratio or higher flow. A new inline torquemeter was installed to provide an alternate measurement of fan and compressor efficiency, along with the standard pressure and temperature measurements. A refurbished compressor bearing housing was also installed with bidirectional rotation capability, so that a variety of existing hardware could be tested. Four new lubrication modules with backup capability were installed for the motor, gearbox, torquemeter, and compressor bearing housing, so that in case the primary pump fails, the backup will prevent damage to the rotating hardware. The combustion air supply line for the facility inlet air system was activated to provide dry air for repeatable inlet conditions. New flow conditioning hardware was installed in the facility inlet plenum tank, which greatly reduced the inlet turbulence. The new inlet can also be easily modified to accommodate 20- or 22-in.-diameter fans and compressors, so a variety of existing hardware from other facilities (such as Glenn's 9- by 15-Foot Low-Speed Wind Tunnel) can be tested in the Single-Stage Axial Compressor Facility. An exhaust line was also installed to provide bleed capability to remove the inlet boundary layer. To improve the operation and control of the facility, a new programmable logic controller (PLC) was installed to upgrade from hardwired relay logic to software logic. The PLC also enabled the usage of human-machine interface software to allow for easier operation of the facility and easier reconfiguration of the facility controls when

  13. F/H Effluent Treatment Facility filtration upgrade alternative evaluations overview

    Energy Technology Data Exchange (ETDEWEB)

    Miles, W.C. Jr.; Poirier, M.R.; Brown, D.F.

    1992-01-01

    The F/H Effluent Treatment Facility (ETF) at the Savannah River Site (SRS) was designed to treat process wastewater from the 200-F/H Production Facilities (routine wastewater) as well as intermittent flows from the F/H Retention Basins and F/H Cooling Water Basins (nonroutine wastewater). Since start-up of the ETF at SRS in 1988, the treatment process has experienced difficulties processing routine and nonroutine wastewater. Studies have identified high bacteria and bacterial decomposition products in the wastewater as the cause for excessive fouling of the filtration system. In order to meet Waste Management requirements for the treatment of processed wastewater, an upgrade of the ETF filtration system is being developed. This upgrade must be able to process the nonroutine wastewater at design capacity. As a result, a study of alternative filter technologies was conducted utilizing simulated wastewater. The simulated wastewater tests have been completed. Three filter technologies, centrifugal polymeric ultrafilters, tubular polymeric ultrafilters, and backwashable cartridge filters have been selected for further evaluation utilizing actual ETF wastewater.

  14. F/H Effluent Treatment Facility filtration upgrade alternative evaluations overview

    Energy Technology Data Exchange (ETDEWEB)

    Miles, W.C. Jr.; Poirier, M.R.; Brown, D.F.

    1992-07-01

    The F/H Effluent Treatment Facility (ETF) at the Savannah River Site (SRS) was designed to treat process wastewater from the 200-F/H Production Facilities (routine wastewater) as well as intermittent flows from the F/H Retention Basins and F/H Cooling Water Basins (nonroutine wastewater). Since start-up of the ETF at SRS in 1988, the treatment process has experienced difficulties processing routine and nonroutine wastewater. Studies have identified high bacteria and bacterial decomposition products in the wastewater as the cause for excessive fouling of the filtration system. In order to meet Waste Management requirements for the treatment of processed wastewater, an upgrade of the ETF filtration system is being developed. This upgrade must be able to process the nonroutine wastewater at design capacity. As a result, a study of alternative filter technologies was conducted utilizing simulated wastewater. The simulated wastewater tests have been completed. Three filter technologies, centrifugal polymeric ultrafilters, tubular polymeric ultrafilters, and backwashable cartridge filters have been selected for further evaluation utilizing actual ETF wastewater.

  15. F/H effluent treatment facility filtration upgrade alternative evaluations overview

    International Nuclear Information System (INIS)

    Miles, W.C. Jr.; Poirier, M.R.; Brown, D.F.

    1992-01-01

    The F/H Effluent Treatment Facility (ETF) at the Savannah River Site (SRS) was designed to treat process wastewater from the 200-F/H Production Facilities (routine wastewater) as well as intermittent flows from the F/H Retention Basins and F/H Cooling Water Basins (nonroutine wastewater). Since start-up of the ETF at SRS in 1988, the treatment process has experienced difficulties processing routine and nonroutine wastewater. Studies have identified high bacteria and bacterial decomposition products in the wastewater as the cause for excessive fouling of the filtration system. In order to meet Waste Management requirements for the treatment of processed wastewater, an upgrade of the ETF filtration system is being developed. This upgrade must be able to process the nonroutine wastewater at design capacity. As a result, a study of alternative filter technologies was conducted utilizing simulated wastewater. The simulated wastewater tests have been completed. Three filter technologies, centrifugal polymeric ultrafilters, tubular polymeric ultrafilters, and backwashable cartridge filters have been selected for further evaluation utilizing actual ETF wastewater. (author)

  16. Comparative assessment of alternative cycles for waste heat recovery and upgrade

    International Nuclear Information System (INIS)

    Little, Adrienne B.; Garimella, Srinivas

    2011-01-01

    Thermally activated systems based on sorption cycles, as well as mechanical systems based on vapor compression/expansion are assessed in this study for waste heat recovery applications. In particular, ammonia-water sorption cycles for cooling and mechanical work recovery, a heat transformer using lithium bromide-water as the working fluid pair to yield high temperature heat, and organic Rankine cycles using refrigerant R245fa for work recovery as well as versions directly coupled to a vapor compression cycle to yield cooling are analyzed with overall heat transfer conductances for heat exchangers that use similar approach temperature differences for each cycle. Two representative cases are considered, one for smaller-scale and lower temperature applications using waste heat at 60 o C, and the other for larger-scale and higher temperature waste heat at 120 o C. Comparative assessments of these cycles on the basis of efficiencies and system footprints guide the selection of waste heat recovery and upgrade systems for different applications and waste heat availabilities. Furthermore, these considerations are used to investigate four case studies for waste heat recovery for data centers, vehicles, and process plants, illustrating the utility and limitations of such solutions. The increased implementation of such waste heat recovery systems in a variety of applications will lead to decreased primary source inputs and sustainable energy utilization. -- Highlights: → Sorption and mechanical pathways for the conversion of waste heat streams to work, cooling, and temperature boosting were investigated. → Waste heat sources including 300 W of energy at 60 o C and 1 kW of energy at 120 o C were analyzed. → Up to about seventy percent of the input waste heat can be converted to cooling. → Up to about ten percent can be converted to work. → Up to about 47 percent can be upgraded to a higher temperature.

  17. Operational experiences and upgradation of waste management facilities Trombay, India

    International Nuclear Information System (INIS)

    Chander, Mahesh; Bodke, S.B.; Bansal, N.K.

    2001-01-01

    Full text: Waste Management Facilities Trombay provide services for the safe management of radioactive wastes generated from the operation of non power sources at Bhabha Atomic Research Centre, India. The paper describes in detail the current operational experience and facility upgradation by way of revamping of existing processes equipment and systems and augmentation of the facility by way of introducing latest processes and technologies to enhance the safety. Radioactive wastes are generated from the operation of research reactors, fuel fabrication, spent fuel reprocessing, research labs. manufacture of sealed sources and labeled compounds. Use of radiation sources in the field of medical, agriculture and industry also leads to generation of assorted solid waste and spent sealed radiation sources which require proper waste management. Waste Management Facilities Trombay comprise of Effluent Treatment Plant (ETP), Decontamination Centre (DC) and Radioactive Solid Waste Management Site (RSMS). Low level radioactive liquid effluents are received at ETP. Plant has 100 M 3 /day treatment capacity. Decontamination of liquid effluents is effected by chemical treatment method using co- precipitation as a process. Plant has 1800 M 3 of storage capacity. Chemical treatment system comprises of clarifloculator, static mixer and chemical feed tanks. Plant has concentrate management facility where chemical sludge is centrifuged to effect volume reduction of more that 15. Thickened sludge is immobilized in cement matrix. Decontamination Centre caters to the need of equipment decontamination from research reactors. Process used is ultrasonic chemical decontamination. Besides this DC provides services for decontamination of protective wears. Radioactive Solid Waste Management Site is responsible for the safe management of solid waste generated at various research reactors, plants, laboratories in Bhabha Atomic Research Centre. Spent sealed radiation sources are also stored

  18. Laser performance upgrade for precise ICF experiment in SG-Ⅲ laser facility

    Directory of Open Access Journals (Sweden)

    Wanguo Zheng

    2017-09-01

    Full Text Available The SG-Ⅲ laser facility (SG-Ⅲ is the largest laser driver for inertial confinement fusion (ICF researches in China, which has 48 beamlines and can deliver 180 kJ ultraviolet laser energy in 3 ns. In order to meet the requirements of precise physics experiments, some new functionalities need to be added to SG-Ⅲ and some intrinsic laser performances need upgrade. So at the end of SG-Ⅲ's engineering construction, the 2-year laser performance upgrade project started. This paper will introduce the newly added functionalities and the latest laser performance of SG-Ⅲ. With these function extensions and performance upgrade, SG-Ⅲ is now fully prepared for precise ICF experiments and solidly paves the way towards fusion ignition.

  19. Upgrade and development of nuclear data production test facility

    Energy Technology Data Exchange (ETDEWEB)

    Namkung, Won; Ko, I. S.; Cho, M. H.; Lee, Y. S.; Kang, H. S. [Pohang Univ. of Science and Technology, Pohang (Korea, Republic of); Kim, G. N. [Kyungpook National Univ., Daegu (Korea, Republic of); Koh, S. K. [Univ. of Ulsan, Ulsan (Korea, Republic of); Ro, T. I. [Donga Univ., Busan (Korea, Republic of); Choi, G. U. [Korea Research Institute of Standards and Science, Daejeon (Korea, Republic of)

    2005-04-15

    It is necessary to improve the Pohang Neutron Facility (PNF) in order to be used as a nuclear data production facility for users in both domestic and abroad. We improved following items: upgrade the electron linac, collimators inside the TOF beam pipe, the development and installation of an automatic sample changer, the extension of the TOF beam line, and the data acquisition system. We would like to establish a utilization system for users to measure the nuclear data at the PNF. To do this, we made manuals for the accelerator operation and the data acquisition system. We also made an application form to apply for users to measure the nuclear data in both domestic and abroad. The main object of the Pohang Neutron Facility is to measure the nuclear data in the neutron energy region from thermal neutron to few hundreds of eV. In addition to neutron beams produced at the PNF, photon and electron beams are produced in this facility. We thus utilize this facility for other fields, such as test facility for detectors, activation experiments, polarized neutron beam source, and so on. In addition to these, we could use this facility for training students.

  20. New operational spaces for the electron cyclotron resonance heating at ASDEX upgrade

    International Nuclear Information System (INIS)

    Hoehnle, Hendrik Sebastian

    2012-01-01

    In this thesis, new electron cyclotron resonance heating (ECRH) scenarios were developed for an extension of the operational space at the tokamak ASDEX Upgrade in view of ITER compatibility. In the last years, the first wall material at ASDEX Upgrade was changed from graphite to tungsten, and the ECRH is needed to control the tungsten concentration in the plasma core. But, in ITER-like plasma discharges at ASDEX Upgrade, the usage of the ECRH in the typically used second harmonic extraordinary polarised mode (X2 mode) is limited. In these ITER-scenarios a small safety factor should be achieved, which implements an increase of the plasma current at ASDEX Upgrade. A higher plasma current and a high confinement lead to a raised density and for the ITER scenario to an electron density above the cutoff of the X2 mode at ASDEX Upgrade. Therefore, the X2 mode is reflected at the cutoff layer and cannot be used for central heating and the control of the tungsten concentration. One possibility to overcome this problem is to apply the third harmonic mode at reduced magnetic field. Here the cutoff is increased by 33% due to the dependence on the magnetic field. However, at the reachable plasma parameters at the reduced field the absorption of the X3 mode is incomplete (60-70 %) and the shine-trough power can destroy microwave sensitive components in ASDEX Upgrade. To solve this problem the magnetic field has to be optimized. A slightly increased magnetic field from 1.7 T to 1.8 T moves the second harmonic resonance in the region of confined plasma with high temperatures and density, so that this resonance can act as beam dump. The deposition in the plasma core is still central enough for the tungsten control ability of the ECRH. The benefit of the beam dump was verified in experiments with two different magnetic fields (1.7 T and 1.8 T). In case of the higher magnetic field, the stray radiation was reduced; simultaneously the electron temperature was increased. In addition

  1. Upgrade of ICRF heating system on EAST

    International Nuclear Information System (INIS)

    Chen Gen; Zhao Yanpin; Mao Yuzhou

    2013-01-01

    ICRF (Ion Cyclotron Range of Frequency) heating is an essential heating and current drive tool on EAST (Experimental Advanced Superconducting Tokamak). The high-power steady-state transmitters were designed as a part of research and development of ICRF heating system which aimed at output power of 1.5 MW for 1000 s in a frequency range of 25 to 70 MHz. There are 3 stage power amplifiers for each transmitter. Tube TH525A and TH535 were chosen for drive power amplifier (DPA) and final power amplifier (FPA), respectively. The power supply system of DPA and FPA were upgraded by using reliable PSM high voltage sources, whose response time is less than 5 μs. The ICRF system, which consists of 8 transmitters, will give out more than 10 MW total output power in the future. Four of them have been already fabricated, and another four are under construction. Three liquid stub tuners are used for impedance matching between antennas and transmitters, which can be only tuned shot to shot. There are two fast wave heating antennas which are assembled at I port and B port on EAST. Several projects are in progress including fast response impedance matching, distributed data acquisition and control system and so on for EAST ICRF heating system. (author)

  2. Shielding assessment for the proposed HRIBF upgrade to the National ISOL Facility

    International Nuclear Information System (INIS)

    Slater, C.O.; Olsen, D.K.; Johnson, J.O.; Lillie, R.A.; Gabriel, T.A.

    1997-04-01

    An upgrade of the existing ORNL Holifield Radioactive Ion Beam Facility (HRIBF) to the National Radioactive Ion Beam Isotope Separator On Line (RIB ISOL) Facility is being proposed. Part of the upgrade involves increasing the source proton energy and current, resulting in more intense, higher energy radiation. Shielding requirements for the proposed upgrade to the HRIBF have been assessed with respect to weight, space, and dose-rate constraints. Shielding assessments were made for operating, shutdown, and accident conditions. The results indicate reasonable shielding solutions for the target room except for the marginal dose rate on the roof. Shielding requirements in the target room were greatly reduced by decisions to move the target to a more interior room and to direct the proton beam downward into the target. A slightly more difficult shielding problem arises for proton beam extraction losses from the cyclotron. Here, the assumed isotropic beam losses (hence, neutron emissions) mean higher roof dose rates than those over the target room unless substantial localized shielding is placed over the cyclotron. Shutdown dose rates were found to present no problems. While dose rates through the sides of the facility during accident conditions will probably satisfy the accident dose-rate constraints, dose rates above the roof will be well above the constraints unless a solution is devised to shield the locations where beam losses are likely to occur. Ground activation analysis was postponed for this study

  3. Upgrade of DC power supply system in ITER CS model coil test facility

    International Nuclear Information System (INIS)

    Shimono, Mitsugu; Uno, Yasuhiro; Yamazaki, Keita; Kawano, Katsumi; Isono, Takaaki

    2014-03-01

    Objective of the ITER CS Model Coil Test Facility is to evaluate a large scale superconducting conductor for fusion using the Central Solenoid (CS) Model Coil, which can generate a 13T magnetic field in the inner bore with a 1.5 m diameter. The facility is composed of a helium refrigerator / liquefier system, a DC power supply system, a vacuum system and a data acquisition system. The DC power supply system supplies currents to two superconducting coils, the CS Model Coil and an insert coil. A 50-kA DC power supply is installed for the CS Model Coil and two 30 kA DC power supplies are installed for an insert coil. In order to evaluate superconducting performance of a conductor used for ITER Toroidal Field (TF) coils whose operating current is 68 kA, the line for an insert coil is upgraded. A 10 kA DC power supply was added, DC circuit breakers were upgraded, bus bars and current measuring instrument were replaced. In accordance to the upgrade, operation manual was revised. (author)

  4. Overview of new, upgraded, or proposed high energy physics facilities in the United States and Canada

    International Nuclear Information System (INIS)

    Gabriel, T.A.

    1994-01-01

    This article reviews six new, proposed, or upgraded accelerator facilities in the United States and Canada. All of the accelerators that are presented here in one form or fashion challenge the validity of the Standard Model of high energy physics which ''currently explains'' all experimentally know phenomena. These facilities include the Continuous Electron Beam Accelerator Facility (CEBAF) at Newport News, Virginia, the Kaon Factory at TRIUMF in Vancouver, British Columbia, Canada, the Asymmetric B Factory at the Stanford Linear Accelerator Center (SLAC) in Palo Alto, California, the Relativistic Heavy Ion Collider (RHIC) facility at Brookhaven National Laboratory in Upton, New York, the injector upgrade project at the Fermi National Accelerator Laboratory (FNAL) in Batavia, Illinois, and the Superconducting Super Collider Laboratory (SSCL) in Waxachachie, Texas

  5. TA-55 facility control system upgrade project - human-system interface functional requirements

    International Nuclear Information System (INIS)

    Atkins, W.H.; Pope, N.G.; Turner, W.J.; Brown, R.E.

    1995-11-01

    The functional requirements for that part of the Technical Area (TA)-55 Operations Center Upgrade Project that involves the human-system interface (HSI) are described in this document. The upgrade project seeks to replace completely the center's existing computerized data acquisition and display system, which consists of the field multiplexer units, Data General computer systems, and associated peripherals and software. The upgrade project has two parts-the Facility Data Acquisition Interface System (FDAIS) and the HSI. The HSI comprises software and hardware to provide a high-level graphical operator interface to the data acquisition system, as well as data archiving, alarm annunciation, and logging. The new system will be built with modern, commercially available components; it will improve reliability and maintainability, and it can be expanded for future needs

  6. Arc Heated Scramjet Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Arc Heated Scramjet Test Facility is an arc heated facility which simulates the true enthalpy of flight over the Mach number range of about 4.7 to 8 for free-jet...

  7. Upgrade and Development of Nuclear Data Production Test Facility

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-04-15

    It is necessary to improve the Pohang Neutron Facility (PNF) in order to be used as a nuclear data production facility for users in both domestic and abroad. We improved following items: (1) upgrade the electron linac, (2) collimators inside the TOF beam pipe, (3) the development and installation of an automatic sample changer, (4) the extension of the TOF beam line, and (5) the data acquisition system. We would like to establish a utilization system for users to measure the nuclear data at the PNF. To do this, we made manuals for the accelerator operation and the data acquisition system. We also made an application form to apply for users to measure the nuclear data in both domestic and abroad. The main object of the Pohang Neutron Facility is to measure the nuclear data in the neutron energy region from thermal neutron to few hundreds of eV. In addition to neutron beams produced at the PNF, photon and electron beams are produced in this facility. We thus utilize this facility for other fields, such as test facility for detectors, activation experiments, polarized neutron beam source, and so on. In addition to these, we could use this facility for training students

  8. Core heat transfer experiment for JRR-3 to be upgraded at 20 MWt, 2

    International Nuclear Information System (INIS)

    Sudo, Yukio; Miyata, Keiichi; Ikawa, Hiromasa; Ohgawara, Masami; Kaminaga, Masanori

    1985-09-01

    Experiments were carried out to investigate the condition of onset of nucleate boiling (ONB) and the departure from nucleate boiling (DNB) heat flux under forced convection in a vertical rectangular channel, both of which take important roles in the core thermal-hydraulic design of the upgraded JRR-3. This report presents the validity and applicability of the correlations proposed for ONB condition and DNB heat flux, based on the analysis of the experimental results. The upgraded JRR-3 is a low-pressure, low-temperature research reactor and the core heat generation is removed by two cooling modes, one is natural circulation under upflow up to 200 kW and the other is forced circulation under downflow up to 20 MW. Therefore, the difference in heat transfer characteristics between upflow and downflow were investigated in the experiments, which were carried out by using a heated channel properly simulating a subchannel of fuel element because the heat transfer characteristics are considered to be strongly dependent on the configuration of flow channel. (author)

  9. Upgrading of TREAT experimental capabilities

    International Nuclear Information System (INIS)

    Dickerman, C.E.; Rose, D.; Bhattacharyya, S.K.

    1982-01-01

    The TREAT facility at the Argonne National Laboratory site in the Idaho National Engineering Laboratory is being upgraded to provide capabilities for fast-reactor-safety transient experiments not possible at any other experimental facility. Principal TREAT Upgrade (TU) goal is provision for 37-pin size experiments on energetics of core-disruptive accidents (CDA) in fast breeder reactor cores with moderate sodium void coefficients. this goal requires a significant enhancement of the capabilities of the TREAT facility, specifically including reactor control, hardened neutron spectrum incident on the test sample, and enlarged building. The upgraded facility will retain the capability for small-size experiments of the types currently being performed in TREAT. Reactor building and crane upgrading have been completed. TU schedules call for the components of the upgraded reactor system to be finished in 1984, including upgraded TREAT fuel and control system, and expanded coverage by the hodoscope fuel-motion diagnostics system

  10. Seismic analysis, evaluation and upgrade design for a nuclear facility exhaust stack building

    International Nuclear Information System (INIS)

    Malik, L.E.; Kabir, A.F.

    1991-01-01

    This paper reports on an exhaust stack building of a nuclear reactor facility with complex structural configuration that has been analyzed and evaluated for seismic forces. This building was built in the 1950's and had not been designed to resist seismic forces. A very rigorous analysis and evaluation program was implemented to minimize the costly retrofits required to upgrade the building to resist high seismic forces. The seismic evaluations were performed for the building in its as-is configuration, and as modified for several upgrade schemes. Soil-structure-interaction, base mat flexibility and the influence of the nearby reactor building have been considered in the seismic analyses. The rigorous analyses and evaluation enabled limited upgrades to qualify the stack building for the seismic forces

  11. Mold Heating and Cooling Pump Package Operator Interface Controls Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Josh A. Salmond

    2009-08-07

    The modernization of the Mold Heating and Cooling Pump Package Operator Interface (MHC PP OI) consisted of upgrading the antiquated single board computer with a proprietary operating system to off-the-shelf hardware and off-the-shelf software with customizable software options. The pump package is the machine interface between a central heating and cooling system that pumps heat transfer fluid through an injection or compression mold base on a local plastic molding machine. The operator interface provides the intelligent means of controlling this pumping process. Strict temperature control of a mold allows the production of high quality parts with tight tolerances and low residual stresses. The products fabricated are used on multiple programs.

  12. Risk management considerations for seismic upgrading of an older facility for short-term residue stabilization

    International Nuclear Information System (INIS)

    Additon, S.L.; Peregoy, W.L.; Foppe, T.L.

    1999-01-01

    Building 707 and its addition, Building 707A, were selected, after the production mission of Rocky Flats was terminated a few years ago, to stabilize many of the plutonium residues remaining at the site by 2002. The facility had undergone substantial safety improvements to its safety systems and conduct of operations for resumption of plutonium operations in the early 1990s and appeared ideally suited for this new mission to support accelerated Site closure. During development of a new authorization basis, a seismic evaluation was performed. This evaluation addressed an unanalyzed expansion joint and suspect connection details for the precast concrete tilt-up construction and concluded that the seismic capacity of the facility is less than half of that determined by previous analysis. Further, potential seismic interaction was identified between a collapsing Building 707 and the seismically upgraded Building 707A, possibly causing the partial collapse of the latter. Both the operating contractor and the Department of Energy sought a sound technical basis for deciding how to proceed. This paper addresses the risks of the as-is facility and possible benefits of upgrades to support a decision on whether to upgrade the seismic capacity of Building 707, accept the risk of the as-is facility for its short remaining mission, or relocate critical stabilization missions. The paper also addresses the Department of Energy's policy on natural phenomena

  13. High heat flux facility GLADIS

    International Nuclear Information System (INIS)

    Greuner, H.; Boeswirth, B.; Boscary, J.; McNeely, P.

    2007-01-01

    The new ion beam facility GLADIS started the operation at IPP Garching. The facility is equipped with two individual 1.1 MW power ion sources for testing actively cooled plasma facing components under high heat fluxes. Each ion source generates heat loads between 3 and 55 MW/m 2 with a beam diameter of 70 mm at the target position. These parameters allow effective testing from probes to large components up to 2 m length. The high heat flux allows the target to be installed inclined to the beam and thus increases the heated surface length up to 200 mm for a heat flux of 15 MW/m 2 in the standard operating regime. Thus the facility has the potential capability for testing of full scale ITER divertor targets. Heat load tests on the WENDELSTEIN 7-X pre-series divertor targets have been successfully started. These tests will validate the design and manufacturing for the production of 950 elements

  14. The concept of underground nuclear heat and power plants (UNHPP) of upgraded safety, developed on the basis of ship-building technologies

    International Nuclear Information System (INIS)

    Pashin, V.M.; Petrov, Eh.L.; Shalik, G.P.; Khazov, B.S.; Malyshev, S.P.

    1996-01-01

    A concept of underground nuclear heat and power plants (UNHPP) of upgraded safety on the basis of ship-building technologies is considered, in which the priority is set to population security and environmental protection. Ways of realization of ziro radiation risk for the population residing in a close vicinity of UNHPP are substantiated. basic principles of the concept are formulated which envisage the use of ship propulsion reactor facilities that have been multiply tested in operation. The sources of economic competitiveness of UNHPPs, as compared with the existing NPPs, are shown

  15. Heat generation and heating limits for the IRUS LLRW disposal facility

    International Nuclear Information System (INIS)

    Donders, R.E.; Caron, F.

    1995-10-01

    Heat generation from radioactive decay and chemical degradation must be considered when implementing low-level radioactive waste (LLRW) disposal. This is particularly important when considering the management of spent radioisotope sources. Heating considerations and temperature calculations for the proposed IRUS (Intrusion Resistant Underground Structure) near-surface disposal facility are presented. Heat transfer calculations were performed using a finite element code with realistic but somewhat conservative heat transfer parameters and environmental boundary conditions. The softening-temperature of the bitumen waste-form (38 deg C) was found to be the factor that limits the heat generation rate in the facility. This limits the IRUS heat rate, assuming a uniform source term, to 0.34 W/m 3 . If a reduced general heat-limit is considered, then some higher-heat packages can be accepted with restrictions placed on their location within the facility. For most LLRW, heat generation from radioactive decay and degradation are a small fraction of the IRUS heating limits. However, heating restrictions will impact on the disposal of higher-activity radioactive sources. High activity 60 Co sources will require decay-storage periods of about 70 years, and some 137 Cs will need to bed disposed of in facilities designed for higher-heat waste. (author). 21 refs., 8 tabs., 2 figs

  16. Heated Tube Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Heated Tube Facility at NASA GRC investigates cooling issues by simulating conditions characteristic of rocket engine thrust chambers and high speed airbreathing...

  17. Upgrades and expansion of the Cornell High Energy Synchrotron Source (CHESS)

    International Nuclear Information System (INIS)

    White, Jeffrey A.

    2000-01-01

    The Cornell High Energy Synchrotron Source (CHESS) is a user-oriented National Facility that provides state-of-the-art synchrotron radiation facilities to scientists worldwide. With major new funding in 1999, we now have 5 ongoing upgrade and expansion projects: 1) a new building addition that will house a new wiggler beamline (CHESS G-line) with three new experimental stations; 2) a new more powerful wiggler source for both A and G beamlines; 3) an upgrade to the A-line optics for better heat load handling and focussing; 4) a rebuild of the F-cave optics room with new optics to handle higher machine current; and 5) a renovation to the user laboratory space surrounding the F1 and F2 crystallography stations. We expect these upgrades and a new G line Cornell faculty collaborating group to raise the level of excitement and productivity at CHESS for many years to come

  18. Extension of electron cyclotron heating at ASDEX Upgrade with respect to high density operation

    Directory of Open Access Journals (Sweden)

    Schubert Martin

    2017-01-01

    Full Text Available The ASDEX Upgrade electron cyclotron resonance heating operates at 105 GHz and 140 GHz with flexible launching geometry and polarization. In 2016 four Gyrotrons with 10 sec pulse length and output power close to 1 MW per unit were available. The system is presently being extended to eight similar units in total. High heating power and high plasma density operation will be a part of the future ASDEX Upgrade experiment program. For the electron cyclotron resonance heating, an O-2 mode scheme is proposed, which is compatible with the expected high plasma densities. It may, however, suffer from incomplete single-pass absorption. The situation can be improved significantly by installing holographic mirrors on the inner column, which allow for a second pass of the unabsorbed fraction of the millimetre wave beam. Since the beam path in the plasma is subject to refraction, the beam position on the holographic mirror has to be controlled. Thermocouples built into the mirror surface are used for this purpose. As a protective measure, the tiles of the heat shield on the inner column were modified in order to increase the shielding against unabsorbed millimetre wave power.

  19. Irradiation test of the HCAL Forward and Endcap upgrade electronics at the CHARM facility at CERN

    CERN Document Server

    AUTHOR|(CDS)2068434; Costanza, Francesco; Karakaya, Tugba; Sahin, Mehmet Ozgur; Lincoln, Don; Strobbe, Nadja; Kaminskiy, Alexander; Tlisov, Danila; Wang, Yanchu; Hirschauer, James Francis

    2016-01-01

    In the period October 21 – 28, 2015, the CMS HCAL group did a radiation tolerance study for the Phase I Upgrade HF, HE and HB front end electronics. The test was conducted at the CERN CHARM facility, which is a mixed field radiation facility. No permanent damages were observed. Effects observed during the irradiation are presented.

  20. Upgrade and modernization of NBSR

    International Nuclear Information System (INIS)

    Williams, Robert E.

    1995-01-01

    The NBSR, a 20-MW research reactor operated by the National Institute of Standards and Technology, has become the leading US laboratory in neutron research. About 1000 scientists from 200 industries, government and foreign laboratories, and universities conducted experiments at the NBSR in 19931. Since 1990, when the first instruments in the Cold Neutron Research Facility (CNRF) became available, the number of research participants has doubled. A major program of modernization and facility upgrade was initiated in order to meet this growing demand, and to assure safe and reliable reactor operations for 30 additional years. A scheduled shutdown, begun in late May 1994, is nearing completion at this writing (May 1995). To upgrade the CNRF, the D 2 0 cold neutron source has been replaced with a liquid hydrogen cold source, and the remaining four neutron guides are being installed. In addition, the primary and secondary cooling systems have been modernized with the installation of plate heat exchangers, and the refueling system has been completely refurbished. Periodic maintenance is also being done. The entire D20 primary coolant inventory is about to be replaced, and new shim arms have been installed

  1. Upgrade to the Birmingham Irradiation Facility

    CERN Document Server

    Dervan, P; Hodgson, P; Marin- Reyes; Parker, K; Wilson, J; Baca, M

    2015-01-01

    The Birmingham Irradiation Facility was developed in 2013 at the University of Birmingham using the Medical Physics MC40 cyclotron. It can achieve High Luminosity LHC (HL-LHC) fluences of 10^15 (1 MeV neutron equivalent (neq)) cm^-2 in 80 s with proton beam currents of 1 μA and so can evaluate effectively the performance and durability of detector technologies and new components to be used for the HL-LHC. Irradiations of silicon sensors and passive materials can be carried out in a temperature controlled cold box which moves continuously through the homogenous beamspot. This movement is provided by a pre-configured XY-axis Cartesian robot scanning system. In 2014 the cooling system and cold box were upgraded from a recirculating glycol chiller system to a liquid nitrogen evaporative system. The new cooling system achieves a stable temperature of 50 1C in 30 min and aims to maintain sub-0 1C temperatures on the sensors during irradiations. This paper reviews the design, development, commissioning and perform...

  2. MAST Upgrade – Construction Status

    Energy Technology Data Exchange (ETDEWEB)

    Milnes, Joe, E-mail: Joe.Milnes@ccfe.ac.uk; Ayed, Nizar Ben; Dhalla, Fahim; Fishpool, Geoff; Hill, John; Katramados, Ioannis; Martin, Richard; Naylor, Graham; O’Gorman, Tom; Scannell, Rory

    2015-10-15

    Highlights: • Outlines unique capability of MAST-U, including divertor and diagnostic capability. • Describes progress made in the manufacture and assembly of key MAST-U components. • Highlights the design challenges that have been overcome. • Lists the key lessons learned thus far in the project. - Abstract: The Mega Amp Spherical Tokamak (MAST) is the centre piece of the UK fusion research programme. In 2010, a MAST Upgrade programme was initiated with three primary objectives, to contribute to: (1) testing reactor concepts (in particular exhaust solutions via a flexible divertor allowing Super-X and other extended leg configurations); (2) adding to the knowledge base for ITER (by addressing important plasma physics questions and developing predictive models to help optimise ITER performance of ITER) and (3) exploring the feasibility of using a spherical tokamak as the basis for a fusion Component Test Facility. With the project mid-way through its construction phase, progress will be reported on a number of the critical subsystems. This will include manufacture and assembly of the coils, armour and support structures that make up the new divertors, construction of the new set coils that make up the centre column, installation of the new power supplies for powering the divertor coils and enhanced TF coil set, progress in delivering the upgraded diagnostic capability, the modification and upgrading of the NBI heating systems and the complete overhaul of the machine control infrastructure, including a new control room with full remote participation facilities.

  3. OMEGA Upgrade preliminary design

    International Nuclear Information System (INIS)

    Craxton, R.S.

    1989-10-01

    The OMEGA laser system at the Laboratory for Laser Energetics of the University of Rochester is the only major facility in the United States capable of conducting fully diagnosed, direct-drive, spherical implosion experiments. As such, it serves as the national Laser Users Facility, benefiting scientists throughout the country. The University's participation in the National Inertial Confinement Fusion (ICF) program underwent review by a group of experts under the auspices of the National Academy of Sciences (the Happer Committee) in 1985. The Happer Committee recommended that the OMEGA laser be upgraded in energy to 30 kJ. To this end, Congress appropriated $4,000,000 for the preliminary design of the OMEGA Upgrade, spread across FY88 and FY89. This document describes the preliminary design of the OMEGA Upgrade. The proposed enhancements to the existing OMEGA facility will result in a 30-kHJ, 351-nm, 60-beam direct-drive system, with a versatile pulse-shaping facility and a 1%--2% uniformity of target drive. The Upgrade will allow scientists to explore the ignition-scaling regime, and to study target behavior that is hydrodynamically equivalent to that of targets appropriate for a laboratory microfusion facility (LMF). In addition, it will be possible to perform critical interaction experiments with large-scale-length uniformly irradiated plasmas

  4. Scrape-off layer radiation and heat load to the ASDEX Upgrade LYRA divertor

    International Nuclear Information System (INIS)

    Kallenbach, A.; Kaufmann, M.; Coster, D.P.

    1999-01-01

    In 1997 the new 'LYRA' divertor went into operation at ASDEX Upgrade and, in parallel, the neutral beam heating power was increased to 20 MW by installation of a second injector leading to a P/R value of 12 MW/m. Experiments have shown that the ASDEX Upgrade LYRA divertor is capable of handling such high heating powers. There is an overall reduction of the maximum heat flux in the LYRA divertor by about a factor of 2 compared with the previous open divertor Div I. This reduction is mainly due to increased radiative losses inside the divertor region, which are caused by an effective reflection of hydrogen neutrals into the hot separatrix region. The main channel of radiative loss is carbon radiation, which cools the divertor plasma down to a few electronvolts, where hydrogen radiation losses become significant. The radiative losses preferentially reduce the power flux at the separatrix, leading to early detachment around the strike point position. With increasing density, the detached region extends upwards on the vertical target. The power fraction radiated in the LYRA divertor is around 45% and nearly independent of the heating power. This value is a factor of 2 higher than the typical radiation fraction in Div I. B2-EIRENE modelling of the performed experiments supports the experimental finding and refines the understanding of loss processes in the divertor region. (author)

  5. Experience in the upgrading of radioactive waste disposal facility 'Ekores'

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.

    2000-01-01

    The national Belarus radioactive disposal facility 'Ekores' is designed for waste from nuclear applications in industry, medicine and research. Currently 12-20 tons of waste and over 6000 various types spent sources annually come to the 'Ekores'. Total activity in the vaults is evaluated as 352.8 TBq. Approximately 150 000 spent sources disposed of in the vaults and wells have total activity about 1327 TBq. In 1997 the Government initiated a project for the facility reconstruction in order to upgrade radiological safety of the site by creating adequate safety conditions for managing and storage of the waste. The reconstruction project developed by Belarus specialists has been reviewed by IAEA experts. This covers modernising technologies for new coming waste and also that the waste currently disposed in the pits is retrieved, sorted and treated in the same way as the new coming waste

  6. Electron heat transport studies using transient phenomena in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Jacchia, A.; Angioni, C.; Manini, A.; Ryter, F.; Apostoliceanu, M.; Conway, G.; Fahrbach, H.-U.; Kirov, K.K.; Leuterer, F.; Reich, M.; Sutttrop, W.; Cirant, S.; Mantica, P.; De Luca, F.; Weiland, J.

    2005-01-01

    Experiments in tokamaks suggest that a critical gradient length may cause the resilient behavior of T e profiles, in the absence of ITBs. This agrees in general with ITG/TEM turbulence physics. Experiments in ASDEX Upgrade using modulation techniques with ECH and/or cold pulses demonstrate the existence of a threshold in R/L Te when T e >T i and T e ≤T i . For T e >T i linear stability analyses indicate that electron heat transport is dominated by TEM modes. They agree in the value of the threshold (both T e and n e ) and for the electron heat transport increase above the threshold. The stabilization of TEM modes by collisions yielded by gyro-kinetic calculations, which suggests a transition from TEM to ITG dominated transport at high collisionality, is experimentally demonstrated by comparing heat pulse and steady-state diffusivities. For the T e ∼T i discharges above the threshold the resilience, normalized by T e 3/2 , is similar to that of the TEM dominated cases, despite very different conditions. The heat pinch predicted by fluid modeling of ITG/TEM turbulence is investigated by perturbative transport in off-axis ECH-heated discharges. (author)

  7. Characterization of ion heat conduction in JET and ASDEX Upgrade plasmas with and without internal transport barriers

    Energy Technology Data Exchange (ETDEWEB)

    Wolf, R C [Institut fuer Plasmaphysik, Forschungszentrum Juelich, Association EURATOM/FZJ, Trilateral Euregio Cluster, D-52425 Juelich (Germany); Baranov, Y [UKAEA/EURATOM Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Garbet, X [Association EURATOM-CEA sur la fusion, CEA Cadarache, F-13108 St Paul lez Durance (France); Hawkes, N [UKAEA/EURATOM Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Peeters, A G [Max-Planck-Institut fuer Plasmaphysik, EURATOM-Assoziation, D-85748 Garching (Germany); Challis, C [UKAEA/EURATOM Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom); Baar, M de [FOM Instituut voor Plasmafyisica Rijnhuizen, Association EURATO-FOM, Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Giroud, C [FOM Instituut voor Plasmafyisica Rijnhuizen, Association EURATO-FOM, Trilateral Euregio Cluster, PO Box 1207, 3430 BE Nieuwegein (Netherlands); Joffrin, E [Association EURATOM-CEA sur la fusion, CEA Cadarache, F-13108 St Paul lez Durance (France); Mantsinen, M [Helsinki University of Technology, Association-EURATOM Tekes, FIN-02015 HUT (Finland); Mazon, D [Association EURATOM-CEA sur la fusion, CEA Cadarache, F-13108 St Paul lez Durance (France); Meister, H [Max-Planck-Institut fuer Plasmaphysik, EURATOM-Assoziation, D-85748 Garching (Germany); Suttrop, W [Max-Planck-Institut fuer Plasmaphysik, EURATOM-Assoziation, D-85748 Garching (Germany); Zastrow, K-D [UKAEA/EURATOM Fusion Association, Culham Science Centre, Abingdon, OX14 3DB (United Kingdom)

    2003-09-01

    In ASDEX Upgrade and JET, the ion temperature profiles can be described by R/L{sub Ti} which exhibits only little variations, both locally, when comparing different discharges, and radially over a wide range of the poloidal cross-section. Considering a change of the local ion heat flux of more than a factor of two, this behaviour indicates some degree of profile stiffness. In JET, covering a large ion temperature range from 1 to 25 keV, the normalized ion temperature gradient, R/L{sub Ti}, shows a dependence on the electron to ion temperature ratio or toroidal rotational shear. In particular, in hot ion plasmas, produced predominantly by neutral beam heating at low densities, in which large T{sub i}/T{sub e} is coupled to strong toroidal rotation, the effect of the two quantities cannot be distinguished. Both in ASDEX Upgrade and JET, plasmas with internal transport barriers (ITBs), including the PEP mode in JET, are characterized by a significant increase of R/L{sub Ti} above the value of L- and H-mode plasmas. In agreement with previous ASDEX Upgrade results, no increase of the ion heat transport in reversed magnetic shear ITB plasmas is found in JET when raising the electron heating. Evidence is presented that magnetic shear directly influences R/L{sub Ti}, namely decreasing the ion heat transport when going from weakly positive to negative magnetic shear.

  8. Sustainable Governance for the Opened Electric Vehicle Charging and Upgraded Facilities Market

    Directory of Open Access Journals (Sweden)

    Tian Wu

    2017-11-01

    Full Text Available Since the China State Grid opened the market for infrastructure construction of electric charging stations and allowed Tesla, Potevio, BAIC BJEV and other enterprises to provide their own charging stations and other infrastructure construction, the development of electric vehicles has been greatly affected. How to maintain a sustainable governance in the opened electric vehicle charging and upgraded facilities market is an important policy issues. This paper presents a monopolistic competition model for the differentiated products market and addresses several issues related to Cournot equilibrium to illustrate why the expected free market actually operates in a monopolistic competition market structure. The analytic solution of the model shows that whether the extent of firm entry is insufficient, excessive or optimum is determined by consumers’ time preference, level of production differentiation and features of cost structure, including fixed cost and marginal cost. The sensitivity analysis has been performed among the above factors and tracked some other factors which would determine the effect of the new policy issues. The main policy suggestion is that the government should optimize entry regulations and lay down the criterion of charging interface standards for charging stations to avoid the electric vehicle charging and upgraded facilities marketization process of a one-size-fits-all solution and form a monopolistic competition market.

  9. Design and Validation of Control Room Upgrades Using a Research Simulator Facility

    Energy Technology Data Exchange (ETDEWEB)

    Ronald L. Boring; Vivek Agarwal; Jeffrey C. Joe; Julius J. Persensky

    2012-11-01

    Since 1981, the United States (U.S.) Nuclear Regulatory Commission (NRC) [1] requires a plant- specific simulator facility for use in training at U.S. nuclear power plants (NPPs). These training simulators are in near constant use for training and qualification of licensed NPP operators. In the early 1980s, the Halden Man-Machine Laboratory (HAMMLab) at the Halden Reactor Project (HRP) in Norway first built perhaps the most well known set of research simulators. The HRP offered a high- fidelity simulator facility in which the simulator is functionally linked to a specific plant but in which the human-machine interface (HMI) may differ from that found in the plant. As such, HAMMLab incorporated more advanced digital instrumentation and controls (I&C) than the plant, thereby giving it considerable interface flexibility that researchers took full advantage of when designing and validating different ways to upgrade NPP control rooms. Several U.S. partners—the U.S. NRC, the Electrical Power Research Institute (EPRI), Sandia National Laboratories, and Idaho National Laboratory (INL) – as well as international members of the HRP, have been working with HRP to run control room simulator studies. These studies, which use crews from Scandinavian plants, are used to determine crew behavior in a variety of normal and off-normal plant operations. The findings have ultimately been used to guide safety considerations at plants and to inform advanced HMI design—both for the regulator and in industry. Given the desire to use U.S. crews of licensed operators on a simulator of a U.S. NPP, there is a clear need for a research simulator facility in the U.S. There is no general-purpose reconfigurable research oriented control room simulator facility in the U.S. that can be used for a variety of studies, including the design and validation of control room upgrades.

  10. Physical protection upgrades in Ukraine

    International Nuclear Information System (INIS)

    Djakov, A.

    1998-01-01

    The U.S. DOE is providing nuclear material safeguards assistance in both material control and accountability and in physical protection to several facilities in Ukraine. This paper summarizes the types of physical protection upgrades that have been or are presently being implemented at these facilities. These facilities include the Kiev Institute for Nuclear Research, Kharkov Institute of Physics and Technology, Sevastopol Institute of Nuclear Energy and Industry, and the South Ukraine Nuclear Power Plant. Typical upgrades include: hardening of storage areas; improvements in access control, intrusion detection, and CCTV assessment; central alarm station improvements; and implementation of new voice communication systems. Methods used to implement these upgrades and problems encountered are discussed. Training issues are also discussed

  11. High power electron cyclotron heating in ISX and ORMAK Upgrade at ORNL

    International Nuclear Information System (INIS)

    England, A.C.; Eldridge, O.C.; Marcus, F.B.; Sprott, J.C.; Namkung, W.; Wilgen, J.B.

    1976-05-01

    A phased program of plasma heating at the electron cyclotron frequency is proposed for the Oak Ridge tokamaks ISX and ORMAK Upgrade. The past history of the program of electron cyclotron heating (ECH) at ORNL on mirrors and in the ELMO Bumpy Torus has been successful. Future technological developments in the production of high power high frequency microwave tubes look promising at this time. The physics of wave propagation and particle heating are fairly well understood and indicate the viability of this technique. Studies on breakdown and on runaway electron reduction will provide useful information for larger machines. Recent experiments in the USSR on small tokamaks have shown that ECH is a viable heating technique. Providing that the microwave tubes become available, the engineering considerations suggest that the technique is practical and workable, based on present day technology

  12. Ion cyclotron resonant heating 2 x 1700 loop antenna for the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Brooksby, C.A.; Ferguson, S.W.; Molvik, A.W.; Barter, J.

    1985-01-01

    This paper reviews the mechanical design and improvements that have taken place on the loop type ion cyclotron resonance heating (ICRH) antennas that are located in the center cell region of the Tandem Mirror Experiment-Upgrade (TMX-U)

  13. The Los Alamos National Laboratory Chemistry and Metallurgy Research Facility upgrades project - A model for waste minimization

    International Nuclear Information System (INIS)

    Burns, M.L.; Durrer, R.E.; Kennicott, M.A.

    1996-07-01

    The Los Alamos National Laboratory (LANL) Chemistry and Metallurgy Research (CMR) Facility, constructed in 1952, is currently undergoing a major, multi-year construction project. Many of the operations required under this project (i.e., design, demolition, decontamination, construction, and waste management) mimic the processes required of a large scale decontamination and decommissioning (D ampersand D) job and are identical to the requirements of any of several upgrades projects anticipated for LANL and other Department of Energy (DOE) sites. For these reasons the CMR Upgrades Project is seen as an ideal model facility - to test the application, and measure the success of - waste minimization techniques which could be brought to bear on any of the similar projects. The purpose of this paper will be to discuss the past, present, and anticipated waste minimization applications at the facility and will focus on the development and execution of the project's open-quotes Waste Minimization/Pollution Prevention Strategic Plan.close quotes

  14. Tri-axial square Helmholtz coil system at the Alibag Magnetic Observatory: upgraded to a magnetic sensor calibration facility

    Science.gov (United States)

    Mahavarkar, Prasanna; John, Jacob; Dhapre, Vijay; Dongre, Varun; Labde, Sachin

    2018-04-01

    A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia), was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG) in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.

  15. Tri-axial square Helmholtz coil system at the Alibag Magnetic Observatory: upgraded to a magnetic sensor calibration facility

    Directory of Open Access Journals (Sweden)

    P. Mahavarkar

    2018-04-01

    Full Text Available A tri-axial square Helmholtz coil system for the study of palaeomagnetic studies, manufactured by GEOFYZIKA (former Czechoslovakia, was successfully commissioned at the Alibag Magnetic Observatory (IAGA code: ABG in the year 1985. This system was used for a few years, after which the system encountered technical problems with the control unit. Rectification of the unit could not be undertaken, as the information document related to this system was not available, and as a result the system had been lying in an unused state for a long time, until 2015, when the system was recommissioned and upgraded to a test facility for calibrating the magnetometer sensors. We have upgraded the system with a constant current source and a data-logging unit. Both of these units have been designed and developed in the institute laboratory. Also, re-measurements of the existing system have been made thoroughly. The upgraded system is semi-automatic, enabling non-specialists to operate it after a brief period of instruction. This facility is now widely used at the parent institute and external institutions to calibrate magnetometers and it also serves as a national facility. Here the design of this system with the calibration results for the space-borne fluxgate magnetometers is presented.

  16. Seismic upgrading of the Brookhaven High Flux Beam Research Reactor

    International Nuclear Information System (INIS)

    Subudhi, M.

    1985-01-01

    In recent years the High Flux Beam Research (HFBR) reactor facility at Brookhaven National Laboratory (BNL) was upgraded from 40 to 50 MW power level. The reactor plant was built in the early sixties to the seismic design requirements of the period, using the static load approach. While the plant power level was upgraded, the seismic design was also improved according to current design criteria. This included the development of new floor response spectra for the facility and an overall seismic analysis of those systems important to the safe shutdown of the reactor. Items included in the reanalysis are the containment building with its internal structure, the piping systems, tanks, equipment, and heat exchangers. This paper describes the procedure utilized in developing the floor response spectra for the existing facility. Also included in the paper are the findings and recommendations, based on the seismic analysis, regarding the seismic adequacy of structural and mechanical systems vital to achieving the safe shutdown of the reactor. 11 references, 4 figures, 1 table

  17. Safety analysis report upgrade program at the Plutonium Facility, Los Alamos National Laboratory

    International Nuclear Information System (INIS)

    Pan, P.Y.

    1993-01-01

    Plutonium research and development activities have resided at the Los Alamos National Laboratory (LANL) since 1943. The function of the Plutonium Facility (PF-4) has been to perform basic special nuclear materials research and development and to support national defense and energy programs. The original Final Safety Analysis Report (FSAR) for PF-4 was approved by DOE in 1978. This FSAR analyzed design-basis and bounding accidents. In 1986, DOE/AL published DOE/AL Order 5481.1B, ''Safety Analysis and Review System'', as a requirement for preparation and review of safety analyses. To meet the new DOE requirements, the Facilities Management Group of the Nuclear Material Technology Division submitted a draft FSAR to DOE for approval in April 1991. This draft FSAR analyzed the new configurations and used a limited-scope probabilistic risk analysis for accident analysis. During the DOE review of the draft FSAR, DOE Order 5480.23 ''Nuclear Safety Analysis Reports'', was promulgated and was later officially released in April 1992. The new order significantly expands the scope, preparation, and maintenance efforts beyond those required in DOE/AL Order 5481.1B by requiring: description of institutional and human-factor safety programs; clear definitions of all facility-specific safety commitments; more comprehensive and detailed hazard assessment; use of new safety analysis methods; and annual updates of FSARs. This paper describes the safety analysis report (SAR) upgrade program at the Plutonium Facility in LANL. The SAR upgrade program is established to meet the requirements in DOE Order 5480.23. Described in this paper are the SAR background, authorization basis for operations, hazard classification, and technical program elements

  18. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

    Science.gov (United States)

    Emrich, William J. Jr.; Moran, Robert P.; Pearson, J. Boise

    2012-01-01

    To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities

  19. Upgrades for TwinSol facility

    Energy Technology Data Exchange (ETDEWEB)

    O’Malley, P.D.; Bardayan, D.W.; Kolata, J.J.; Hall, M.R.; Hall, O.; Allen, J. [Physics Department, University of Notre Dame, Notre Dame, IN 46556 (United States); Becchetti, F.D. [Physics Department, U. Michigan, Ann Arbor MI 48109 (United States)

    2016-06-01

    TwinSol, a pair of coupled, superconducting solenoids, was one of the first devices capable of producing beams of radioactive nuclei at energies near the Coulomb barrier. A primary beam from University of Notre Dame (UND) tandem accelerator is used to bombard a primary target producing a secondary beam in flight. TwinSol is used to gather, separate, and focus the recoils. Since it was commissioned at the UND in 1997, at least 58 publications have reported data from its use and there have been hundreds of collaborators from many different countries that use this device. Currently, plans are in place at the UND to provide several upgrades to TwinSol, including a multi-cell gas production target and the possible addition of a third solenoid. Upgrades currently in progress will be discussed along with future plans.

  20. Planned upgrade to the coaxial plasma source facility for high heat flux plasma flows relevant to tokamak disruption simulations

    International Nuclear Information System (INIS)

    Caress, R.W.; Mayo, R.M.; Carter, T.A.

    1995-01-01

    Plasma disruptions in tokamaks remain serious obstacles to the demonstration of economical fusion power. In disruption simulation experiments, some important effects have not been taken into account. Present disruption simulation experimental data do not include effects of the high magnetic fields expected near the PFCs in a tokamak major disruption. In addition, temporal and spatial scales are much too short in present simulation devices to be of direct relevance to tokamak disruptions. To address some of these inadequacies, an experimental program is planned at North Carolina State University employing an upgrade to the Coaxial Plasma Source (CPS-1) magnetized coaxial plasma gun facility. The advantages of the CPS-1 plasma source over present disruption simulation devices include the ability to irradiate large material samples at extremely high areal energy densities, and the ability to perform these material studies in the presence of a high magnetic field. Other tokamak disruption relevant features of CPS-1U include a high ion temperature, high electron temperature, and long pulse length

  1. Automation and Upgrade of Thermal System for Large 38-Year Young Test Facility

    Science.gov (United States)

    Webb, Andrew

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38-years was one of the driving design factors for the size of the equipment. The installation was completed on-time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  2. Automation and Upgrade of Thermal System for Large 38-Year-Young Test Facility

    Science.gov (United States)

    Webb, Andrew T.; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center's Space Environment Simulator (SES) facility has been improved by the upgrade of its thermal control hardware and software. This paper describes the preliminary design process, funding constraints, and the proposed enhancements as well as the installation details, the testing difficulties, and the overall benefits realized from this upgrade. The preliminary design process was discussed in a paper presented in October 1996 and will be recapped in this paper to provide background and comparison to actual product. Structuring the procurement process to match the funding constraints allowed Goddard to enhance its capabilities in an environment of reduced budgets. The installation of the new system into a location that has been occupied for over 38 years was one of the driving design factors for the size of the equipment. The installation was completed on time and under budget. The tuning of the automatic sequences for the new thermal system to the existing shroud system required more time and ultimately presented some setbacks to the vendor and the final completion of the system. However, the end product and its benefits to Goddard's thermal vacuum test portfolio will carry the usefulness of this facility well into the next century.

  3. Results of activities at the upgraded inspection and repair facility in Temelin NPP

    International Nuclear Information System (INIS)

    Samojlov, O.B.; Romanov, A.I.; Sholin, E.V.; Molchanov, V.L.

    2010-01-01

    Based on a contract signed between JSC TVEL and CEZ a.s., JSC TVEL provided additional equipment for the VVantage6 FA inspection and repair facility at the Temelin NPP to switch to TVSA-T inspection and repair. JSC TVEL analyzed the equipment (modules) of the Temelin NPP inspection and repair facility with focus on the compatibility of the current facility design and modules with the TVSA-T design. Based on the analysis, a set of modules and systems was identified, which were developed and manufactured or upgraded to ensure TVSA-T inspection and repair in the Temelin NPP facility. The set of modules and systems for TVSA-T inspection and repair included: (i) A guide to point the FA headpiece manipulator at the guide thimbles and to point the Cladding Integrity Monitoring (CIM) manipulator (which is part of the CIM System) at the upper end plugs; (ii) A guide grip to install the guide on the facility workstation table; (iii) An FA headpiece manipulator to detach, remove, install and attach the TVSA-T headpiece; (iv) A jig to point the upgraded fuel rod extraction tool at the upper end plug of the extracted fuel rod; (v) A colette and a locking tube to extract a fuel rod and install a displacer using the fuel rod extraction tool, which is part of the Temelin facility; (vi) A CIM system to detect leaky fuel rods. Pictures of the modules and of the fuel rod extraction tools are displayed, and the CIM system is described. The principle to detect leaky fuel rods is explained. In 2010, TVSA-T mockup repair tests were conducted in the Temelin NPP facility using earlier manufactured modules and systems. The following operations were performed during the tests: detaching and removal of the TVSA-T headpiece; detection of leaky fuel rod mockups; extraction of the fuel rod mockup and installation of the displacer in its place; installation and attaching of the TVSA-T headpiece. The installation of the following 2 TV systems is planned for 2011: a color non

  4. Upgrade of the cryogenic infrastructure of SM18, CERN main test facility for superconducting magnets and RF cavities

    Science.gov (United States)

    Perin, A.; Dhalla, F.; Gayet, P.; Serio, L.

    2017-12-01

    SM18 is CERN main facility for testing superconducting accelerator magnets and superconducting RF cavities. Its cryogenic infrastructure will have to be significantly upgraded in the coming years, starting in 2019, to meet the testing requirements for the LHC High Luminosity project and for the R&D program for superconducting magnets and RF equipment until 2023 and beyond. This article presents the assessment of the cryogenic needs based on the foreseen test program and on past testing experience. The current configuration of the cryogenic infrastructure is presented and several possible upgrade scenarios are discussed. The chosen upgrade configuration is then described and the characteristics of the main newly required cryogenic equipment, in particular a new 35 g/s helium liquefier, are presented. The upgrade implementation strategy and plan to meet the required schedule are then described.

  5. A solid tungsten divertor for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Herrmann, A; Greuner, H; Jaksic, N; Böswirth, B; Maier, H; Neu, R; Vorbrugg, S

    2011-01-01

    The conceptual design of a solid tungsten divertor for ASDEX Upgrade (AUG) is presented. The Div-III design is compatible with the existing divertor structure. It re-establishes the energy and heat receiving capability of a graphite divertor and overcomes the limitations of tungsten coatings. In addition, a solid tungsten divertor allows us to investigate erosion and bulk deuterium retention as well as test castellation and target tilting. The design criteria as well as calculations of forces due to halo and eddy currents are presented. The thermal properties of the proposed sandwich structure are calculated with finite element method models. After extensive testing of a target tile in the high heat flux test facility GLADIS, two solid tungsten tiles were installed in AUG for in-situ testing.

  6. Status of the University of Missouri-Columbia Research Reactor upgrade

    International Nuclear Information System (INIS)

    McKibben, J.C.; Edwards, C.B. Jr.; Meyer, W.A. Jr.; Kim, S.S.

    1990-01-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  7. Status of the University of Missouri-Columbia Research Reactor upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Edwards, Jr, C B; Meyer, Jr, W A [MU Research Reactor, Columbia, MO (United States); Kim, S S [Idaho Nuclear Engineering Laboratory, Idaho Falls, ID (United States)

    1990-05-01

    The University of Missouri-Columbia (MU) Research Reactor Facility staff is in the process of upgrading the operational and research capabilities of the reactor and associated facilities. The upgrades include an extended life aluminide fuel element, a power increase, improved instrumentation and control equipment, a cold neutron source, a building addition, and improved research instrumentation and equipment. These upgrades will greatly enhance the capabilities of the facility and the research programs. This paper discusses the parts of the upgrade and current status of implementation. (author)

  8. Development of the irradiation facility SIBO INRA/Tangier, Morocco by upgrading cobalt-60 in a temporary pool and enhancing safety and control features

    Directory of Open Access Journals (Sweden)

    Mohammed Mouhib

    2017-12-01

    Full Text Available An automatic control system is one of the most important parts of an irradiation facility. The level of this control is always maintained to comply with safety procedures during routine work in this field. Also sometimes it is limited to the minimum level of regulation required due to economical aspects; some commercial systems are generally made by manufacturers of industrial facilities and considered affordable by irradiators. In some cases specific irradiation facilities tailor their control systems to their needs. For this kind of irradiator the control system can be developed and upgraded according to personal and industrial experiences. These upgrading procedures are also used by others to develop their systems. The objective of this paper is to share a local experience in upgrading security, safety systems and the use of cobalt-60 for the irradiator. It is a composite experiment at SIBO INRA/Tangier, Morocco and concerns the: (i upgrade of cobalt-60 in a temporary pool in the SIBO irradiator in Tangier. This operation was conducted in collaboration with the International Atomic Energy Agency (IAEA and was a success story of 2014 according to the general conference of IAEA; (ii safety and technical upgrade of the system in the SIBO irradiator made in collaboration with IAEA; (iii installation and upgrade of the security system in accordance with the Global Threat Reduction Programme (GTRP to reduce the threat of a Radiological Dispersal Device (RDD in collaboration with The United States Department of Energy’s National Nuclear Security Administration (NNSA.

  9. Lawrence Berkeley Laboratory upgrading approaches to existing facilities

    International Nuclear Information System (INIS)

    Engle, H.M. Jr.

    1985-01-01

    The Lawrence Berkeley Laboratory Plant Engineering Department instituted a seismic risk investigation and seismic upgrade program in 1970. This paper covers the upgrade of two buildings with dissimilar framing systems; Building No. 10, a World War II vintage heavy timber frame building, and Building No. 80, a steel frame structure constructed in 1954. The seismic upgrade task for both structures required that the buildings be kept in service during rehabilitation with a minimum of disruption to occupants. Rehabilitations were phased over two and three year periods with construction management and supervision performed by LBL Plant Engineering staff

  10. Phase-space resolved measurement of 2nd harmonic ion cyclotron heating using FIDA tomography at the ASDEX Upgrade tokamak

    DEFF Research Database (Denmark)

    Weiland, M.; Bilato, R.; Geiger, B.

    2017-01-01

    Recent upgrades to the FIDA (fast-ion D-alpha) diagnostic at ASDEX Upgrade allow to reconstruct the fast-ion phase space at several radial positions with decent energy and pitch resolution. These new diagnostic capabilities are applied to study the physics of 2nd harmonic ion cyclotron heating, w....... Furthermore, comparisons to other fast-ion diagnostics (neutron yield and neutral particle analyzers) are discussed....

  11. Proposed power upgrade of the hot fuel examination facility's neutron radiography reactor

    International Nuclear Information System (INIS)

    Pruett, D.P.; Richards, W.J.; Heidel, C.C.

    1984-01-01

    The Hot Fuel Examination Facility, HFEF, is one of several facilities located at the Argonne Site. HFEF comprises a large hot cell where both non-destructive and destructive examination of highly-irradiated reactor fuels are conducted in support of the LMFBR program. One of the non-destructive examination techniques utilized at HFEF is neutron radiography. When the NRAD facility was designed and constructed, an operating power level of 250 kw was considered to be adequate for obtaining radiographs of the type of specimens envisaged at that time. Since that time, several things have occurred that have tended to increase radiography exposure times to as much as 90 minutes each. In order to decrease exposure times, the reactor power level is to be increased from 250 kW to 1 MW. This increase in power will necessitate several engineering and design changes. The proposed upgrade of the NRAD facility will increase the neutron flux available in the beam tubes appreciably. The increased flux will enable NRAD to continue to meet its operational commitments in a timely manner and to develop state-of-the-art techniques in the future as it has in the past

  12. Efficient recovery and upgrading of waste heat from humid air in the forest industry. Pre-feasibility study; Energieffektivisering inom skogsindustrin genom spillvaermeaatervinning fraan vaatluft. Foerprojektering och loensamhetsbedoemning av anlaeggningsalternativ

    Energy Technology Data Exchange (ETDEWEB)

    Ingman, Daniel; Gustafsson, Maria; Westermark, Mats

    2007-12-15

    Within the pulp and paper and saw mill industries there are large quantities of waste heat in the form of moist air or humid flue gases. The temperature and dew point are generally too low for the streams to be useful as process heat. Waste heat can be recovered from humid gas streams e.g. outgoing gas from paper machines, lumber dryers, green liquor flash tanks, flue gases from power and recovery boilers, lime kilns etc. In general, this waste heat is available around 50-65 deg C. One way to utilise the heat on a higher temperature level is by means of heat pumping. The present project studies the possibility to use a recently developed absorption heat pump technology for upgrading waste heat to district heating or process steam. Via direct contact between the absorbent and humid gas stream, the moisture is condensed in the absorbent and the latent heat simultaneously increases the liquid's temperature. A number of process solutions have been calculated in terms of technical and economic performance. The process can be designed for production of hot water or process steam from upgraded waste heat. The end product is indirectly governed be the selection of absorbent or working medium. Investigated absorbents are solutions of potassium formate, sodium hydroxide and phosphoric acid, of which the former two have been included in the techno-economic calculations. The upgraded heat can either save costs by replacing primary fuel or result in increased revenues by exporting produced heat. Internally, the produced heat often replaces oil or electricity on the margin. The choice of regeneration method for the used and diluted absorbent is governed by the mill's energy situation. Industries with large waste heat resources, high value on process steam and use of heat on district heat level, waste heat driven regeneration is advisable. Industries with similar value on MP and LP steam should use back-pressure regeneration with MP steam for optimum cost and energy

  13. Upgrading of the AMS facility at the Koffler 14UD Pelletron accelerator

    CERN Document Server

    Berkovits, D; Bordeanu, C; Ghelberg, S; Hass, M; Heber, O; Paul, M; Shahar, Y; Verri, G; 10.1016/j.nimb.2004.04.033

    2004-01-01

    The AMS facility based on a 14UD Pelletron tandem accelerator has been upgraded in recent years to support an active and diversified research program. A new dedicated AMS ion source beam line merging at 45 degrees with the existing injection line through a 45 degrees electrostatic deflector is in operation. The multi-sample high- intensity Cs sputter ion source stands on a separate 120 kV platform and is remote-controlled through a hybrid infrared-fiber-optics link operated either manually or by the accelerator-control computer, ensuring safe and reliable operation. Independent current preamplifiers are used in Faraday cup current readings down to the pA range. The accelerator computer-control system was upgraded to Lab View 6.1, allowing a PC server to control and read out all hardware components while one or more remote PC clients run the AMS software. Ad hoc sequences of commands, written in a script macro language, are run from a client computer to perform an automated AMS measurement. The present capabil...

  14. [Glass Development Laser (GDL) Facility upgrade.] LLE Review. Quarterly report, October-December 1984. Volume 21

    International Nuclear Information System (INIS)

    Kim, H.

    1984-01-01

    This volume of the LLE Review contains articles on the upgrade of the GDL (Glass Development) system, theoretical advances in the laser fusion effort, improved target fabrication capabilities, x-ray laser research, developments in the picosecond optics research of the LLE advanced technology program, and on the National Laser Users Facility activities for October-December 1984. 56 refs., 31 figs., 3 tabs

  15. Maintenance and availability considerations for MFTF-B upgrade

    International Nuclear Information System (INIS)

    Spampinato, P.T.

    1983-01-01

    The upgrade of the Mirror Fusion Test Facility (MFTF-B) tandem mirror device incorporates the operation of advanced systems plus the requirement for remote maintenance. To determine if the operating availability goal of this device is achievable, an assessment of component lifetimes was made, along with estimates of device downtime. Key subsystem components were considered from the magnet, heating, impurity control, pumping, and test module systems. Component replacements were grouped into three categories, and a lifetime operating plan, including component replacements, was developed. It was determined that this device could achieve a 10% operating availability

  16. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Phase II Upgrade Activities

    Science.gov (United States)

    Emrich, William J.; Moran, Robert P.; Pearson, J. Bose

    2013-01-01

    To support the on-going nuclear thermal propulsion effort, a state-of-the-art non nuclear experimental test setup has been constructed to evaluate the performance characteristics of candidate fuel element materials and geometries in representative environments. The facility to perform this testing is referred to as the Nuclear Thermal Rocket Element Environment Simulator (NTREES). This device can simulate the environmental conditions (minus the radiation) to which nuclear rocket fuel components will be subjected during reactor operation. Test articles mounted in the simulator are inductively heated in such a manner so as to accurately reproduce the temperatures and heat fluxes which would normally occur as a result of nuclear fission and would be exposed to flowing hydrogen. Initial testing of a somewhat prototypical fuel element has been successfully performed in NTREES and the facility has now been shutdown to allow for an extensive reconfiguration of the facility which will result in a significant upgrade in its capabilities. Keywords: Nuclear Thermal Propulsion, Simulator

  17. Argonne's atlas control system upgrade

    International Nuclear Information System (INIS)

    Munson, F.; Quock, D.; Chapin, B.; Figueroa, J.

    1999-01-01

    The ATLAS facility (Argonne Tandem-Linac Accelerator System) is located at the Argonne National Laboratory. The facility is a tool used in nuclear and atomic physics research, which focuses primarily on heavy-ion physics. The accelerator as well as its control system are evolutionary in nature, and consequently, continue to advance. In 1998 the most recent project to upgrade the ATLAS control system was completed. This paper briefly reviews the upgrade, and summarizes the configuration and features of the resulting control system

  18. Heating facility for blanket and performance test

    Energy Technology Data Exchange (ETDEWEB)

    Furuya, Kazuyuki; Kuroda, Toshimasa; Enoeda, Mikio; Sato, Satoshi; Hatano, Toshihisa; Takatsu, Hideyuki; Ohara, Yoshihiro [Japan Atomic Energy Research Inst., Naka, Ibaraki (Japan). Naka Fusion Research Establishment; Hara, Shigemitsu

    1999-03-01

    A design and a fabrication of heating test facility for a mock-up of the blanket module to be installed in International Thermonuclear Experimental Reactor (ITER) have been conducted to evaluate/demonstrate its heat removal performance and structural soundness under cyclic heat loads. To simulate surface heat flux to the blanket module, infrared heating method is adopted so as to heat large surface area uniformly. The infrared heater is used in vacuum environment (10{sup -4} Torr{approx}), and the lamps are cooled by air flowing through an annulus between the lamp and a cover tube made of quartz glass. Elastomer O rings (available to be used up to {approx}300degC) and used for vacuum seal at outer surface of the cover tube. To prevent excessive heating of the O ring, the end part of the cover tube is specially designed including the tube shape, flow path of air and gold coating on the surface of the cover tube to protect the O ring against thermal radiation from glowing tungsten filament. To examine the performance of the facility, steady state and cyclic operation of the infrared heater were conducted using a small-scaled shielding blanket mock-up as a test specimen. The important results are as follows: (1) Heat flux at the surface of the small-scaled mock-up measured by a calorimeter was {approx}0.2 MW/m{sup 2}. (2) A comparison of thermal analysis results and measured temperature responses showed that the small-scaled mock-up had good heat removal performance. (3) Steady state operation and cyclic operation with step response between the rated and zero powers of the infrared heater were successfully performed, and it was confirmed that this heating facility was well-prepared and available for the thermal cyclic test of a blanket module. (author)

  19. Upgrading and modernization of the high flux reactor Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1992-01-01

    The High Flux Reactor (HFR) at Petten, The Netherlands, owned by the European Communities and operated by the Netherlands Energy Research Foundation, is a water-cooled and moderated, multipurpose research reactor of the closed-tank in-pool type, operated at 45 MW. Performance upgrading comprised two power increases from 20 MW via 30 MW to 45 MW, providing more and higher rated irradiation positions in the tank. With the replacement of the original reactor vessel the experimental capabilities of the reactor were improved. Better pool side facilities and the introduction of a large cross-section, double, beam tube were implemented. Additional major installation upgrading activities consisted of the replacement of the primary and the pool heat exchangers, replacement of the beryllium reflector elements, extension of the overpower protection systems and upgrading of the nuclear instrumentation as well as the guaranteed power supply. Control room upgrading is in progress. A full new safety analysis, as well as the introduction of a comprehensive Quality Assurance system, are summarized under software upgrading. Continuous modernization and upgrading also takes place of equipment for fuel and structural materials irradiations for fission reactors and future fusion machines. In parallel, all supporting services, as well as the management structure for large irradiation programmes, have been developed. Presently the reactor is operating at about 275 full power days per year with an average utilization of the irradiation positions of 70 to 80%. (orig.)

  20. LOW LEVEL LIQUID RADIOACTIVE WASTE TREATMENT AT MURMANSK, RUSSIA: FACILITY UPGRADE AND EXPANSION

    International Nuclear Information System (INIS)

    BOWERMAN, B.; CZAJKOWSKI, C.; DYER, R.S.; SORLIE, A.

    2000-01-01

    Today there exist many almost overfilled storage tanks with liquid radioactive waste in the Russian Federation. This waste was generated over several years by the civil and military utilization of nuclear power. The current waste treatment capacity is either not available or inadequate. Following the London Convention, dumping of the waste in the Arctic seas is no longer an alternative. Waste is being generated from today's operations, and large volumes are expected to be generated from the dismantling of decommissioned nuclear submarines. The US and Norway have an ongoing co-operation project with the Russian Federation to upgrade and expand the capacity of a treatment facility for low level liquid waste at the RTP Atomflot site in Murmansk. The capacity will be increased from 1,200 m 3 /year to 5,000 m 3 /year. The facility will also be able to treat high saline waste. The construction phase will be completed the first half of 1998. This will be followed by a start-up and a one year post-construction phase, with US and Norwegian involvement for the entire project. The new facility will consist of 9 units containing various electrochemical, filtration, and sorbent-based treatment systems. The units will be housed in two existing buildings, and must meet more stringent radiation protection requirements that were not enacted when the facility was originally designed. The US and Norwegian technical teams have evaluated the Russian design and associated documentation. The Russian partners send monthly progress reports to US and Norway. Not only technical issues must be overcome but also cultural differences resulting from different methods of management techniques. Six to eight hour time differentials between the partners make real time decisions difficult and relying on electronic age tools becomes extremely important. Language difficulties is another challenge that must be solved. Finding a common vocabulary, and working through interpreters make the process very

  1. Summary report for ITER task - T68: MHD facility preparation for Li/V blanket option

    International Nuclear Information System (INIS)

    Reed, C.B.; Haglund, R.C.; Miller, M.E.

    1995-08-01

    A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the question of insulator coatings. Design calculations show that an electrically insulating layer is necessary to maintain an acceptably low MHD pressure drop. To enable experimental investigations of the MHD performance of candidate insulator materials and the technology for putting them in place, the room-temperature ALEX (Argonne's Liquid Metal EXperiment) NaK facility was upgraded to a 300 degrees C lithium system. The objective of this upgrade was to modify the existing facility to the minimum extent necessary, consistent with providing a safe, flexible, and easy to operate MHD test facility which uses lithium at ITER-relevant temperatures, Hartmann numbers, and interaction parameters. The facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups. The system design description for this lithium upgrade of the ALEX facility is given in this document

  2. A megawatt-level 28 GHz heating system for the National Spherical Torus Experiment Upgrade

    Directory of Open Access Journals (Sweden)

    Taylor G.

    2015-01-01

    Full Text Available The National Spherical Torus Experiment Upgrade (NSTX-U will operate at axial toroidal fields of ≤ 1 T and plasma currents, Ip ≤ 2 MA. The development of non-inductive (NI plasmas is a major long-term research goal for NSTX-U. Time dependent numerical simulations of 28 GHz electron cyclotron (EC heating of low density NI start-up plasmas generated by Coaxial Helicity Injection (CHI in NSTX-U predict a significant and rapid increase of the central electron temperature (Te(0 before the plasma becomes overdense. The increased Te(0 will significantly reduce the Ip decay rate of CHI plasmas, allowing the coupling of fast wave heating and neutral beam injection. A megawatt-level, 28 GHz electron heating system is planned for heating NI start-up plasmas in NSTX-U. In addition to EC heating of CHI start-up discharges, this system will be used for electron Bernstein wave (EBW plasma start-up, and eventually for EBW heating and current drive during the Ip flattop.

  3. Darlington tritium removal facility and station upgrading plant dynamic process simulation

    International Nuclear Information System (INIS)

    Busigin, A.; Williams, G. I. D.; Wong, T. C. W.; Kulczynski, D.; Reid, A.

    2008-01-01

    Ontario Power Generation Nuclear (OPGN) has a 4 x 880 MWe CANDU nuclear station at its Darlington Nuclear Div. located in Bowmanville. The station has been operating a Tritium Removal Facility (TRF) and a D 2 O station Upgrading Plant (SUP) since 1989. Both facilities were designed with a Distributed Control System (DCS) and programmable logic controllers (PLC) for process control. This control system was replaced with a DCS only, in 1998. A dynamic plant simulator was developed for the Darlington TRF (DTRF) and the SUP, as part of the computer control system replacement. The simulator was used to test the new software, required to eliminate the PLCs. The simulator is now used for operator training and testing of process control software changes prior to field installation. Dynamic simulation will be essential for the ITER isotope separation system, where the process is more dynamic than the relatively steady-state DTRF process. This paper describes the development and application of the DTRF and SUP dynamic simulator, its benefits, architecture, and the operational experience with the simulator. (authors)

  4. Upgrade of the experimental facilities of the ORPHEE reactor

    International Nuclear Information System (INIS)

    Farnoux, B.; Breant, P.

    1993-01-01

    At the time of the design, the ORPHEE reactor has been equipped with a set of up-to-date experimental facilities such as nine tangential and horizontal beam holes, one hot source, two hydrogen cold sources and six neutron guides. After more than ten years of operations, all the neutron beams are now used by about twenty five spectrometers. A modernisation program is under progress with a two fold aim: upgrade of the existing facilities and creation of new beams. Some details of the six following points will be described: 1) replacement of the flat cold source cell by an hollow cylinder in order first to increase the cold neutron flux and secondly to facilitate the extraction of new cold neutron beams. 2) replacement of the old neutron guide elements coated with natural nickel by new elements with isotopic nickel or super mirror coating. 3) modification of the curvature of some existing neutron guides in order to increase the wavelength band transmission. 4) creation of new cold neutron beams by installation of benders on the existing neutron guides. 5) design of new cold neutron guides and a new guide hall. 6) design of a thermal neutron guide. The two last points will made extensive use of super mirrors allowed by new technical developments done at the Laboratoire LEON BRILLOUIN in connection with industry. (author)

  5. Nuclear Thermal Rocket Element Environmental Simulator (NTREES) Upgrade Activities

    Science.gov (United States)

    Emrich, William J., Jr.

    2014-01-01

    Over the past year the Nuclear Thermal Rocket Element Environmental Simulator (NTREES) has been undergoing a significant upgrade beyond its initial configuration. The NTREES facility is designed to perform realistic non-nuclear testing of nuclear thermal rocket (NTR) fuel elements and fuel materials. Although the NTREES facility cannot mimic the neutron and gamma environment of an operating NTR, it can simulate the thermal hydraulic environment within an NTR fuel element to provide critical information on material performance and compatibility. The first phase of the upgrade activities which was completed in 2012 in part consisted of an extensive modification to the hydrogen system to permit computer controlled operations outside the building through the use of pneumatically operated variable position valves. This setup also allows the hydrogen flow rate to be increased to over 200 g/sec and reduced the operation complexity of the system. The second stage of modifications to NTREES which has just been completed expands the capabilities of the facility significantly. In particular, the previous 50 kW induction power supply has been replaced with a 1.2 MW unit which should allow more prototypical fuel element temperatures to be reached. The water cooling system was also upgraded to so as to be capable of removing 100% of the heat generated during. This new setup required that the NTREES vessel be raised onto a platform along with most of its associated gas and vent lines. In this arrangement, the induction heater and water systems are now located underneath the platform. In this new configuration, the 1.2 MW NTREES induction heater will be capable of testing fuel elements and fuel materials in flowing hydrogen at pressures up to 1000 psi at temperatures up to and beyond 3000 K and at near-prototypic reactor channel power densities. NTREES is also capable of testing potential fuel elements with a variety of propellants, including hydrogen with additives to inhibit

  6. Main-ion temperature and plasma rotation measurements based on scattering of electron cyclotron heating waves in ASDEX Upgrade

    DEFF Research Database (Denmark)

    Pedersen, Morten Stejner; Rasmussen, Jesper; Nielsen, Stefan Kragh

    2017-01-01

    We demonstrate measurements of spectra of O-mode electron cyclotron resonance heating (ECRH) waves scattered collectively from microscopic plasma fluctuations in ASDEX Upgrade discharges with an ITER-like ECRH scenario. The measured spectra are shown to allow determination of the main ion...... temperature and plasma rotation velocity. This demonstrates that ECRH systems can be exploited for diagnostic purposes alongside their primary heating purpose in a reactor relevant scenario....

  7. Study on thermal-hydraulic phenomena identification of passive heat removal facilities

    International Nuclear Information System (INIS)

    Park, J. Y.

    2011-01-01

    Recently, passive heat removal facilities have been integral features of new generation or future reactor designs worldwide. This is because the passive heat removal facilities depending on a natural force such as buoyancy can give much higher operational reliability compared to active heat removal facilities depending on pumped fluid flow and as a result they can decrease core damage frequency of a nuclear power plant drastically ever achievable before. Keeping pace with this global trend, SMART and APR+ reactors also have introduced passive heat removal features such as a passive residual heat removal system (PRHRS) and a passive auxiliary feed water system (PAFS) in their designs. Since many thermal-hydraulic (T-H) phenomena including steam condensation are involved during operation of the passive heat removal facilities, they ought to be properly simulated by T-H codes such as MARS-KS and RELAP5 in order to guarantee reliable safety analysis by these codes. Unfortunately, however, these T-H codes are not well validated with respect to phenomena related to passive heat removal mechanism because previous focus on these codes validation was mainly on the LB LOCA and resulting phenomena. To resolve this gap, Korea Institute of Nuclear Safety has initiated a research program on the development of safety analysis technology for passive heat removal facilities. The main target of this program is PRHRS and PAFS in SMART and APR+ reactors and through this program, validation of capability of existing T-H codes and improvement of codes regarding passive facilities analysis are to be sought. In part of this research, T-H phenomena important to passive heat removal facilities (PRHRS and PAFS) are investigated in the present study

  8. Efficiency analysis of solar facilities for building heating and household water heating under conditions in the Czech Republic

    OpenAIRE

    Pivko, Michal; Jursová, Simona; Turjak, Juraj

    2012-01-01

    The paper studies the efficiency of solar facilities applied for the heating of buildings and household water heating in the Czech Republic. The Czech Republic is situated in the temperate zone characterized by changeable weather. It is respected in the assessment of a solar facility installation. The efficiency of solar facilities is evaluated according to energy and economic balances. It is analyzed for solar facilities heating both household water and buildings. The main problems relating ...

  9. An upgrade practice of a double-rack source 60Co source irradiator

    International Nuclear Information System (INIS)

    Dong Hui; Peng Wei; Liu Zhaomin

    2009-01-01

    An upgrade practice of a double-rack irradiator with the design capacity of 2.96 x10 16 Bq (800 kCi) was reported. The detailed contents and characteristics of this upgrade, a comparison on the facility performance before and after the upgrade, and the cost-benefit analysis were carried out. After upgrade, the facility performance increased over 50%, and brought much directly economical benefit and indirectly economical benefit. The upgrade was successful, and set up a demonstrational sample. (authors)

  10. TCV divertor upgrade for alternative magnetic configurations

    Directory of Open Access Journals (Sweden)

    H. Reimerdes

    2017-08-01

    Full Text Available The Swiss Plasma Center (SPC is planning a divertor upgrade for the TCV tokamak. The upgrade aims at extending the research of conventional and alternative divertor configurations to operational scenarios and divertor regimes of greater relevance for a fusion reactor. The main elements of the upgrade are the installation of an in-vessel structure to form a divertor chamber of variable closure and enhanced diagnostic capabilities, an increase of the pumping capability of the divertor chamber and the addition of new divertor poloidal field coils. The project follows a staged approach and is carried out in parallel with an upgrade of the TCV heating system. First calculations using the EMC3-Eirene code indicate that realistic baffles together with the planned heating upgrade will allow for a significantly higher compression of neutral particles in the divertor, which is a prerequisite to test the power dissipation potential of various divertor configurations.

  11. Human factors aspects of the major upgrade to control systems at the Los Alamos National Laboratory Plutonium Facility

    International Nuclear Information System (INIS)

    Higgins, J.; Pope, N.

    1997-01-01

    The Plutonium Facility (TA-55) at Los Alamos National Laboratory (LANL) has been in operation for over 15 years. It handles projects such as: stockpile maintenance, surveillance, and dismantlement; pit rebuild; plutonium power source fabrication for long duration spacecraft missions (e.g., Cassini); nuclear materials technology research; nuclear materials storage; and remediation of nuclear waste. The Operations Center of TA-55 is the nerve center of the facility where operators are on duty around the clock and monitor several thousand data points using the Facility Control System (FCS). The FCS monitors, displays, alarms, and provides some limited control of the following systems; HVAC, fire detection and suppression, radiation detection, electrical, and other miscellaneous systems. The FCS was originally based on late 1970s digital technology, which is not longer supported by the vendors. Additionally, the equipment failure rates increased notably in the 1990s. Thus, plans were put into place to upgrade and replace the FCS hardware, software, and display components with modernized equipment. The process was complicated by the facts that: the facility was operational and could not be totally closed for the modifications; complete documentation was not available for the existing system; the Safety Analyses for the facility were in the process of being upgraded at the same time; and of course limited time and budgets. This paper will discuss the human factors aspects of the design, installation, and testing of the new FCS within the above noted constraints. Particular items to be discussed include the functional requirements definition, operating experience review, screen designs, test program, operator training, and phased activation of the new circuits in an operational facility

  12. LOW LEVEL LIQUID RADIOACTIVE WASTE TREATMENT AT MURMANSK, RUSSIA: FACILITY UPGRADE AND EXPANSION

    Energy Technology Data Exchange (ETDEWEB)

    BOWERMAN,B.; CZAJKOWSKI,C.; DYER,R.S.; SORLIE,A.

    2000-03-01

    Today there exist many almost overfilled storage tanks with liquid radioactive waste in the Russian Federation. This waste was generated over several years by the civil and military utilization of nuclear power. The current waste treatment capacity is either not available or inadequate. Following the London Convention, dumping of the waste in the Arctic seas is no longer an alternative. Waste is being generated from today's operations, and large volumes are expected to be generated from the dismantling of decommissioned nuclear submarines. The US and Norway have an ongoing co-operation project with the Russian Federation to upgrade and expand the capacity of a treatment facility for low level liquid waste at the RTP Atomflot site in Murmansk. The capacity will be increased from 1,200 m{sup 3}/year to 5,000 m{sup 3} /year. The facility will also be able to treat high saline waste. The construction phase will be completed the first half of 1998. This will be followed by a start-up and a one year post-construction phase, with US and Norwegian involvement for the entire project. The new facility will consist of 9 units containing various electrochemical, filtration, and sorbent-based treatment systems. The units will be housed in two existing buildings, and must meet more stringent radiation protection requirements that were not enacted when the facility was originally designed. The US and Norwegian technical teams have evaluated the Russian design and associated documentation. The Russian partners send monthly progress reports to US and Norway. Not only technical issues must be overcome but also cultural differences resulting from different methods of management techniques. Six to eight hour time differentials between the partners make real time decisions difficult and relying on electronic age tools becomes extremely important. Language difficulties is another challenge that must be solved. Finding a common vocabulary, and working through interpreters make the

  13. Upgrade of repetitive fast-heating fusion driver HAMA to implode a shell target by using diode pumped solid state laser

    International Nuclear Information System (INIS)

    MORI, Yoshitaka; NISHIMURA, Yasuhiko; Nakayama, Suisei; HANAYAMA, Ryohei; ISHII, Katsuhiro; SEKINE, Takashi; SATO, Nakahiro; KURITA, Takashi; KAWASHIMA, Toshiyuki; KAN, Hirofumi; KOMEDA, Osamu; NAKAMURA, Naoki; KONDO, Takuya; FUJINE, Manabu; SUNAHARA, Atsushi; MIURA, Eisuke; AZUMA, Hirozumi; HIOKI, Tatsumi; KAKENO, Mitsutaka; KAJINO, Tsutomu

    2016-01-01

    The HAMA is 1-Hz fast heating fusion driver pumped by a 10 J second-harmonic of diode-pumped Nd:glass laser: KURE-1. We have upgraded HAMA to realize an implosion of spherical shell target by using a remaining fundamental beam from KURE-1. This beam of 6 J/1 Hz is transported to the current counter irradiation system. The resulting beam includes three pulses in sequence: 2.2 J/15 ns and 0.7 J/300 ps for implosion, and 0.5 J/ 190 fs for heating. We estimate the implosion dynamics from 1-D radiation hydrodynamic code (START- 1D). It indicates a possibility of tailored-pulse implosion by optimizing the beam spot sizes of imploding beams on the target surface. This upgrade leads to a demonstration of repetitive implosion and additional heating of a spherical shell target in accordance with a repetition of laser operation and that of a target injection system. (paper)

  14. The upgraded JRR-3 and future scope of its utilization

    International Nuclear Information System (INIS)

    Miyasaka, Yasuhiko; Umei, Hiroshi; Takahashi, Hidetake; Sakamoto, Masanobu

    1985-10-01

    At the time of start to construct the upgraded JRR-3, the present report describes general features on the upgraded JRR-3 and future scope of its utilization on the purpose of the mutual understanding with researchers who use the reactor and the utilization facilities. The materials edited in the report have been written by 28 reactor engineers and scientists in JAERI, and 35 scientists in universities. According to the reviewed subjects as shown below, it was confirmed that the upgraded JRR-3 would be extensively expected by much more fields. (1) Reactor and utilization facilities. 1. Plan and main features of the upgraded JRR-3, Reactor building 2. Irradiation facilities: Hydraulic rabbits, Pneumatic tubes, Rig Hot Cell, etc. 3. Neutron beam facilities: Horizontal tubes, Cold neutron source and Neutron guide tubes (2) Neutron beam experimental facilities. 1. Neutron diffractometer, neutron spectrometer, Small-angle neutron scattering, Neutron radiography, etc. (3) Recent trends. 1. Irradiation research of fuels and materials in research reactor 2. Activation analysis, Radioisotope, Neutron transmutation doping, etc. 3. Neutron scattering research. (author)

  15. Density response to central electron heating: theoretical investigations and experimental observations in ASDEX Upgrade

    Science.gov (United States)

    Angioni, C.; Peeters, A. G.; Garbet, X.; Manini, A.; Ryter, F.; ASDEX Upgrade Team

    2004-08-01

    Theory of ion temperature gradient (ITG) and trapped electron modes (TEMs) is applied to the study of particle transport in experimental conditions with central electron heating. It is shown that in the unstable domain of TEMs, the electron thermodiffusive flux is directed outwards. By means of such a flux, a mechanism is identified likely to account for density flattening with central electron heating. Theoretical predictions are compared with experimental observations in ASDEX Upgrade. A parameter domain (including L- and H-mode plasmas) is identified, in which flattening with central electron heating is observed in the experiments. In general, this domain turns out to be the same domain in which the dominant plasma instability is a TEM. On the contrary, the dominant instability is an ITG in plasmas whose density profile is not affected significantly by central electron heating. The flattening predicted by quasi-linear theory for low density L-mode plasmas is too small compared to the experimental observations. At very high density, even when the dominant instability is an ITG, electron heating can provide density flattening, via the coupling with the ion heat channel. In these conditions the anomalous diffusivity increases in response to the increased ion heat flux, while the large collisionality makes the anomalous pinch small and the Ware pinch important.

  16. Future proton and mixed-field irradiation facilities with slow extraction for LHC operation phase and for LHC upgrades

    CERN Document Server

    Assmann, Ralph Wolfgang; Brugger, Markus; Efthymiopoulos, Ilias; Feldbaumer, Eduard; Garrido, Mar Capeans; Glaser, Maurice; Kramer, Daniel; Linssen, Lucie; Losito, Roberto; Moll, Michael; Rembser, Christoph; Silari, Marco; Thurel, Yves; Tsesmelis, Emmanuel; Vincke, Helmut; CERN. Geneva. The LHC experiments Committee; LHCC

    2010-01-01

    In the present proposal we present the need for improved proton and mixed-field irradiation facilities with slow beam extraction at CERN. Strong needs are expressed by both the detector and accelerator communities and concern the LHC operation era as well as the upgrades of machine and experiments. The current facilities and test areas have a number of limitations and drawbacks. Preliminary studies indicate that there are possibilities for a coherent and cost-effective approach towards improved facilities for the future. The aim of this document is to inform the LHCC and seek its recognition for the need of such facilities. In addition we would appreciate the support of the LHCC for pursuing further implementation studies at a PS East Hall location.

  17. Cooling and heating facility for nuclear power plant

    International Nuclear Information System (INIS)

    Kakuta, Atsuro

    1994-01-01

    The present invention concerns a cooling and heating facility for a nuclear power plant. Namely, a cooling water supply system supplies cooling water prepared by a refrigerator for cooling the inside of the plant. A warm water supply system supplies warm water having its temperature elevated by using an exhausted heat from a reactor water cleanup system. The facility comprises a heat pump-type refrigerator disposed in a cold water supply system for producing cold water and warm water, and warm water pipelines for connecting the refrigerator and the warm water supply system. With such a constitution, when the exhaust heat from the reactor water cleanup system can not be used, warm water prepared by the heat pump type refrigerator is supplied to the warm water supply system by way of the warm water pipelines. Accordingly, when the exhaust heat from the reactor water cleanup system can not be used such as upon inspection of the plant, a portion of the refrigerators in a not-operated state can be used for heating. Supply of boiler steams in the plant is no more necessary or extremely reduced. (I.S.)

  18. Recovery Act. Tapoco project. Cheoah upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Tran, Paul [Alcoa Inc., Alcoa Center, PA (United States)

    2013-10-02

    Under Funding Opportunity Announcement Number: DE-FOA-0000120, Recovery Act: Hydroelectric Facility Modernization, Alcoa Power Generating Inc. (APGI), a fully owned subsidiary of Alcoa Inc., implemented major upgrades at its Cheoah hydroelectric facility near Robbinsville, North Carolina.

  19. Upgrading the ATLAS control system

    International Nuclear Information System (INIS)

    Munson, F.H.; Ferraretto, M.

    1993-01-01

    Heavy-ion accelerators are tools used in the research of nuclear and atomic physics. The ATLAS facility at the Argonne National Laboratory is one such tool. The ATLAS control system serves as the primary operator interface to the accelerator. A project to upgrade the control system is presently in progress. Since this is an upgrade project and not a new installation, it was imperative that the development work proceed without interference to normal operations. An additional criteria for the development work was that the writing of additional ''in-house'' software should be kept to a minimum. This paper briefly describes the control system being upgraded, and explains some of the reasons for the decision to upgrade the control system. Design considerations and goals for the new system are described, and the present status of the upgrade is discussed

  20. Investigation of thermal integration between biogas production and upgrading

    International Nuclear Information System (INIS)

    Zhang, Xiaojing; Yan, Jinying; Li, Hailong; Chekani, Shabnam; Liu, Loncheng

    2015-01-01

    Highlights: • Identify thermal characteristics of amine-based biogas upgrading for waste heat recovery. • Identify thermal characteristics of AD biogas production as sink for heat recovery. • Evaluation of thermal integration between biogas production and upgrading to improve overall energy efficiency. • Cost analysis applied for the economic feasibility of the thermal integration. • Using the principles of target design and system integration for connected thermal processes. - Abstract: Thermal integration of anaerobic digestion (AD) biogas production with amine-based chemical absorption biogas upgrading has been studied to improve the overall efficiency of the intergraded system. The thermal characteristics have been investigated for industrial AD raw biogas production and amine-based chemical absorption biogas upgrading. The investigation provides a basic understanding for the possibilities of energy saving through thermal integration. The thermal integration is carried out through well-defined cases based on the thermal characteristics of the biogas production and the biogas upgrading. The following factors are taken into account in the case study: thermal conditions of sub-systems, material and energy balances, cost issues and main benefits. The potential of heat recovery has been evaluated to utilise the waste heat from amine-based upgrading process for the use in the AD biogas production. The results show that the thermal integration has positive effects on improving the overall energy efficiency of the integrated biogas plant. Cost analysis shows that the thermal integration is economically feasible

  1. Determination of the stochastic layer properties induced by magnetic perturbations via heat pulse experiments at ASDEX upgrade

    Czech Academy of Sciences Publication Activity Database

    Brida, D.; Lunt, T.; Wischmeier, M.; Birkenmeier, G.; Cahyna, Pavel; Carralero, D.; Faitsch, M.; Feng, Y.; Kurzan, B.; Schubert, M.; Sieglin, B.; Suttrop, W.; Wolfrum, E.

    2017-01-01

    Roč. 12, August (2017), s. 831-837 ISSN 2352-1791 EU Projects: European Commission(XE) 633053 - EUROfusion Institutional support: RVO:61389021 Keywords : ASDEX upgrade * Magnetic perturbations * Divertor heat flux Subject RIV: BL - Plasma and Gas Discharge Physics OBOR OECD: Fluids and plasma physics (including surface physics) http://www.sciencedirect.com/science/article/pii/S2352179116302150

  2. Active Control of Power Exhaust in Strongly Heated ASDEX Upgrade Plasmas

    Science.gov (United States)

    Dux, Ralph; Kallenbach, Arne; Bernert, Matthias; Eich, Thomas; Fuchs, Christoph; Giannone, Louis; Herrmann, Albrecht; Schweinzer, Josef; Treutterer, Wolfgang

    2012-10-01

    Due to the absence of carbon as an intrinsic low-Z radiator, and tight limits for the acceptable power load on the divertor target, ITER will rely on impurity seeding for radiative power dissipation and for generation of partial detachment. The injection of more than one radiating species is required to optimise the power removal in the main plasma and in the divertor region, i.e. a low-Z species for radiation in the divertor and a medium-Z species for radiation in the outer core plasma. In ASDEX Upgrade, a set of robust sensors, which is suitable to feedback control the radiated power in the main chamber and the divertor as well as the electron temperature at the target, has been developed. Different feedback schemes were applied in H-mode discharges with a maximum heating power of up to 23,W, i.e. at ITER values of P/R (power per major radius) to control all combinations of power flux into the divertor region, power flux onto the target or electron temperature at the target through injection of nitrogen as the divertor radiator and argon as the main chamber radiator. Even at the highest heating powers the peak heat flux density at the target is kept at benign values. The control schemes and the plasma behaviour in these discharges will be discussed.

  3. 3D numerical simulations of a LOVA reproduction inside the new facility STARDUST-UPGRADE

    International Nuclear Information System (INIS)

    Ciparisse, J.F.; Malizia, A.; Poggi, L.A.; Gelfusa, M.; Papa, C. Del; Giovannangeli, I.; Gaudio, P.; Tieri, F.; Murari, A.

    2017-01-01

    A loss of vacuum in a vessel, containing or not dust, is the typical case study considered in the STARDUST-UPGRADE facility of the Quantum Electronics and Plasma Group of the university of Rome Tor Vergata. This kind of accident was simulated numerically, without including the presence of dust, for two mass flow rates and three different inlet ports (C, E and F). Numerical settings are explained and the results obtained in each case are shown and discussed. At the end of the work, conclusions about what seen and further foreseen developments of this research are presented.

  4. Project scenarios for bitumen upgrading

    International Nuclear Information System (INIS)

    Koppel, P.E.; Mazurek, W.L.; Harji, A.

    2002-01-01

    The established reserves of Alberta's heavy oil resources are 178 billion barrels, and potential recoverable reserves are 315 billion barrels. The challenge of production includes the logistics of recovery, upgrading and transportation to market. Utilization of the bitumen is not simple because bitumen is too viscous to transport by pipeline. In addition, it is not processable by most existing refineries unless it can be upgraded through dilution. This paper examined different factors regarding the economic viability of various upgrading methods of a wide range of bitumen feedstocks. The study also examined the sensitivity of refinery demand to the prices of these feedstocks, along with the competitiveness among bitumen-based feedstock and conventional crudes. Western Canada, Ontario and the PADD II district in the United States are the 3 major markets for western Canadian bitumen based feedstock, the demand for which depends on refinery configurations and asphalt demand. This paper described the following 4 generic scenarios that describe Alberta bitumen upgrading projects: (1) adjacent to open pit mines, (2) adjacent to steam assisted gravity drainage (SAGD) facilities, (3) remotely located from resource production at an existing refinery, and (4) pipeline bitumen. It was noted that producers should determine the best way to upgrade the bitumen to ensure there is an economic market for the product, but they should also be aware not to over process the bitumen so as not to leave existing refinery facilities under-utilized. 2 refs., 1 tab., 3 figs

  5. High temperature superconducting current lead test facility with heat pipe intercepts

    International Nuclear Information System (INIS)

    Blumenfeld, P.E.; Prenger, C.; Roth, E.W.; Stewart, J.A.

    1998-01-01

    A high temperature superconducting (HTS) current lead test facility using heat pipe thermal intercepts is under development at the Superconducting Technology Center at Los Alamos National Laboratory. The facility can be configured for tests at currents up to 1,000 A. Mechanical cryocoolers provide refrigeration to the leads. Electrical isolation is maintained by intercepting thermal energy from the leads through cryogenic heat pipes. HST lead warm end temperature is variable from 65 K to over 90 K by controlling heat pipe evaporator temperature. Cold end temperature is variable up to 30 K. Performance predictions in terms of heat pipe evaporator temperature as a function of lead current are presented for the initial facility configuration, which supports testing up to 200 A. Measurements are to include temperature and voltage gradient in the conventional and HTS lead sections, temperature and heat transfer rate in the heat pipes. as well as optimum and off-optimum performance of the conventional lead sections

  6. Seismic analysis, evaluation and upgrade design for a DOE exhaust stack building

    International Nuclear Information System (INIS)

    Malik, L.E.; Maryak, M.E.

    1991-01-01

    An exhaust stack building of a nuclear reactor facility with complex structural configuration has been analyzed and evaluated and retrofitted for seismic forces. The building was built in the 1950's and had not been designed to resist seismic forces. A rigorous analysis and evaluation program was implemented to minimize costly retrofits required to upgrade the building to resist high seismic forces. Seismic evaluations were performed for the building in its as-is configuration, and as modified for several upgrade schemes. Soil-structure-interaction, basemat flexibility and the influence of the nearby reactor building were considered in rigorous seismic analyses. These analyses and evaluations enabled limited upgrades to qualify the stack building for the seismic forces. Some of the major conclusions of this study are: (1) a phased approach of seismic analyses, utilizing simplified models to evaluate practicable upgrade schemes, and, then incorporating the most suitable scheme in a rigorous model to obtain design forces for upgrades, is an efficient and cost-effective approach for seismic qualification of nuclear facilities to higher seismic criteria; and, (2) finalizing the upgrade of a major nuclear facility is an iterative process, which continues throughout the construction of the upgrades

  7. Measurements and FLUKA Simulations of Bismuth, Aluminium and Indium Activation at the upgraded CERN Shielding Benchmark Facility (CSBF)

    Science.gov (United States)

    Iliopoulou, E.; Bamidis, P.; Brugger, M.; Froeschl, R.; Infantino, A.; Kajimoto, T.; Nakao, N.; Roesler, S.; Sanami, T.; Siountas, A.; Yashima, H.

    2018-06-01

    The CERN High energy AcceleRator Mixed field (CHARM) facility is situated in the CERN Proton Synchrotron (PS) East Experimental Area. The facility receives a pulsed proton beam from the CERN PS with a beam momentum of 24 GeV/c with 5·1011 protons per pulse with a pulse length of 350 ms and with a maximum average beam intensity of 6.7·1010 protons per second. The extracted proton beam impacts on a cylindrical copper target. The shielding of the CHARM facility includes the CERN Shielding Benchmark Facility (CSBF) situated laterally above the target that allows deep shielding penetration benchmark studies of various shielding materials. This facility has been significantly upgraded during the extended technical stop at the beginning of 2016. It consists now of 40 cm of cast iron shielding, a 200 cm long removable sample holder concrete block with 3 inserts for activation samples, a material test location that is used for the measurement of the attenuation length for different shielding materials as well as for sample activation at different thicknesses of the shielding materials. Activation samples of bismuth, aluminium and indium were placed in the CSBF in September 2016 to characterize the upgraded version of the CSBF. Monte Carlo simulations with the FLUKA code have been performed to estimate the specific production yields of bismuth isotopes (206 Bi, 205 Bi, 204 Bi, 203 Bi, 202 Bi, 201 Bi) from 209 Bi, 24 Na from 27 Al and 115 m I from 115 I for these samples. The production yields estimated by FLUKA Monte Carlo simulations are compared to the production yields obtained from γ-spectroscopy measurements of the samples taking the beam intensity profile into account. The agreement between FLUKA predictions and γ-spectroscopy measurements for the production yields is at a level of a factor of 2.

  8. Physics design of a 28 GHz electron heating system for the National Spherical Torus experiment upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Taylor, G.; Bertelli, N.; Ellis, R. A.; Gerhardt, S. P.; Hosea, J. C.; Poli, F. [Princeton Plasma Physics Laboratory, Princeton University, Princeton, New Jersey 08543 (United States); Harvey, R. W. [CompX, Del Mar, California 92014 (United States); Raman, R. [University of Washington, Seattle, Washington 98195 (United States); Smirnov, A. P. [M.V. Lomonosov Moscow State University, Moscow (Russian Federation)

    2014-02-12

    A megawatt-level, 28 GHz electron heating system is being designed to support non-inductive (NI) plasma current (I{sub p}) start-up and local heating and current drive (CD) in H-mode discharges in the National Spherical Torus Experiment Upgrade (NSTX-U). The development of fully NI I{sub p} start-up and ramp-up is an important goal of the NSTXU research program. 28 GHz electron cyclotron (EC) heating is predicted to rapidly increase the central electron temperature (T{sub e}(0)) of low density NI plasmas generated by Coaxial Helicity Injection (CHI). The increased T{sub e}(0) will significantly reduce the I{sub p} decay rate of CHI plasmas, allowing the coupling of fast wave heating and neutral beam injection. Also 28 GHz electron Bernstein wave (EBW) heating and CD can be used during the I{sub p} flat top in NSTX-U discharges when the plasma is overdense. Ray tracing and Fokker-Planck numerical simulation codes have been used to model EC and EBW heating and CD in NSTX-U. This paper presents a pre-conceptual design for the 28 GHz heating system and some of the results from the numerical simulations.

  9. Parametric sensitivity analysis of a SOLRGT system with the indirect upgrading of low/mid-temperature solar heat

    International Nuclear Information System (INIS)

    Li, Yuan Yuan; Zhang, Na; Cai, Rui Xian

    2012-01-01

    Highlights: ► A solar-assisted methane chemically recuperated gas turbine cycle has been proposed. ► The parametric sensitivity analysis of a SOLRGT system has been carried out. ► The concept of indirect upgrading of solar heat proves to be feasible. -- Abstract: Development of novel solar–fossil fuel hybrid system is important for the efficient utilization of low temperature solar heat. A solar-assisted methane chemically recuperated gas turbine (SOLRGT) system was proposed by Zhang and co-worker, which integrated solar heat into a high efficiency power system. The low temperature solar heat is first converted into vapor latent heat provided for a reformer, and then indirectly upgraded to high-grade generated syngas chemical energy by the reformation reaction. In this paper, based on the above mentioned cycle, a parametric analysis is performed using ASPEN PLUS code to further evaluate the effect of key thermodynamics parameters on the SOLRGT performance. It can be shown that solar collector temperature, steam/air mass ratio, turbine inlet pressure, and turbine inlet temperature have significant effects on system efficiency, solar-to-electricity efficiency, fossil fuel saving ratio, specific CO 2 emission and so on. The solar collector temperature is varied between 140 and 240 °C and the maximum net solar-to-electricity efficiency and system efficiency for a given turbine inlet condition (turbine inlet temperature of 1308 °C and pressure ratio of 15) is 30.2% and 52.9%, respectively. The fossil fuel saving ratio can reach up to 21.8% and the reduction of specific CO 2 emission is also 21.8% compared to the reference system. The system performance is promising for an optimum pressure ratio at a given turbine inlet temperature.

  10. Physical design of JT-60 Super Upgrade

    International Nuclear Information System (INIS)

    Nagashima, K.; Kikuchi, M.; Kurita, G.; Ozeki, T.; Aoyagi, T.; Ushigusa, K.; Neyatani, Y.; Kubo, T.; Mori, K.; Nakagawa, S.; Kuriyama, M.; Nagami, M.

    1997-01-01

    The JT-60 Super Upgrade (JT-60SU) is an upgraded tokamak device of JT-60U for developing the steady-state reactor and advanced tokamak operation in the International Thermonuclear Experimental Reactor. The device is planned to utilize the JT-60 facilities fully and to minimize the needed modification. The major radius is 4.8 m and the maximum plasma current is 10 MA. Neutral beam injection with 750 keV beam energy is the primary heating method. The machine is capable of steady-state operation with high density up to 8.8 x 10 19 m -3 at 5 MA plasma current. The high operating density, over the Greenwald et al. limit, is critically important in order to achieve high bootstrap current fraction. Ballooning mode and low n ideal magnetohydrodynamic (MHD) mode including the bootstrap current were analyzed for steady-state operation. The current profile must be optimized to obtain a normalized beta up to 3. The plasma configuration with high triangularity was adopted in order to get good MHD stability and high energy confinement. A compact divertor was designed in order to get the large plasma space. (orig.)

  11. Down-hole catalytic upgrading of heavy crude oil

    Energy Technology Data Exchange (ETDEWEB)

    Weissman, J.G.; Kessler, R.V.; Sawicki, R.A.; Belgrave, J.D.M.; Laureshen, C.J.; Mehta, S.A.; Moore, R.G.; Ursenbach, M.G. [University of Calgary, Calgary, AB (Canada). Dept. of Chemical and Petroleum Engineering

    1996-07-01

    Several processing options have been developed to accomplish near-well bore in-situ upgrading of heavy crude oils. These processes are designed to pass oil over a fixed bed of catalyst prior to entering the production well, the catalyst being placed by conventional gravel pack methods. The presence of brine and the need to provide heat and reactant gases in a down-hole environment provide challenges not present in conventional processing. These issues were addressed and the processes demonstrated by use of a modified combustion tube apparatus. Middle-Eastern heavy crude oil and the corresponding brine were used at the appropriate reservoir conditions. In-situ combustion was used to generate reactive gases and to drive fluids over a heated sand or catalysts bed, simulating the catalyst contacting portion of the proposed processes. The heavy crude oil was found to be amenable to in-situ combustion at anticipated reservoir conditions, with a relatively low air requirement. Forcing the oil to flow over a heated zone prior to production results in some upgrading of the oil, as compared to the original oil, due to thermal effects. Passing the oil over a hydroprocessing catalyst located in the heated zone results in a product that is significantly upgraded as compared to either the original oil or thermally processed oil. Catalytic upgrading is due to hydrogenation and the results in about a 50% sulfur removal and an 8{degree} API gravity increase. Additionally, the heated catalyst was found to be efficient at converting CO to additional H{sub 2}. While all of the technologies needed for a successful field trial of in-situ catalytic upgrading exist, a demonstration has yet to be undertaken. 27 refs., 5 figs., 5 tabs.

  12. High heat flux engineering for the upgraded neutral beam injection systems of MAST-U

    International Nuclear Information System (INIS)

    Dhalla, F.; Mistry, S.; Turner, I.; Barrett, T.R.; Day, I.; McAdams, R.

    2015-01-01

    Highlights: • A new Residual Ion Dump (RID) and bend magnet system for the upgraded NBI systems have been designed for the 5 s MAST-U pulse requirements. • Design scoping was performed using numerical ion-tracing analysis software (MAGNET and OPERA codes). • A more powerful bending magnet will separate the residual ions into full, half and third energy components. • Three separate CuCrZr dumps spread the power loading resulting in acceptable power footprints. • FE thermo-mechanical analyses using ANSYS to validate the designs against the ITER SDC-IC code. • New bend magnet coils, yoke and CuCrZr water-cooled plates are in the procurement phase. - Abstract: For the initial phase of MAST-U operation the two existing neutral beam injection systems will be used, but must be substantially upgraded to fulfil expected operational requirements. The major elements are the design, manufacture and installation of a bespoke bending magnet and Residual Ion Dump (RID) system. The MAST-design full energy dump is being replaced with new actively-cooled full, half and third energy dumps, designed to receive 2.4 MW of ion power deflected by an iron-cored electromagnet. The main design challenge is limited space available in the vacuum vessel, requiring ion-deflection calculations to ensure acceptable heat flux distribution on the dump panels. This paper presents engineering and physics analysis of the upgraded MAST beamlines and reports the current status of manufacture.

  13. Application for EURATOM priority support of additional heating for ASDEX Upgrade, phase I and phase II

    International Nuclear Information System (INIS)

    Koeppendoerfer, W.; Blaumoser, M.; Ennen, K.; Gruber, J.; Gruber, O.; Jandl, O.; Kaufmann, M.; Kollotzek, H.; Kotzlowski, H.; Lackner, E.; Lackner, K.; Larcher, T. von; Neuhauser, J.; Pillsticker, M.; Poehlchen, R.; Preis, H.; Schneider, H.; Seidel, U.; Sombach, B.; Streibl, B.; Werner, F.; Wieczorek, A.; Speth, E.; Pennigsfeld, F.P.; Feist, J.H.; Freudenberger, K.; Kolos, J.; Kunze, R.C.; Lohnert, H.; Melkus, W.; Ott, W.; Riedler, H.; Staebler, A.; Vollmer, O.; Wittenbecher, K.; Wulff, G.; Noterdaeme, J.M.; Wesner, F.; Baeumler, J.; Braun, F.; Fritsch, R.; Hofmeister, F.; Mark, E. von; Puri, S.; Soell, M.; Steinmetz, K.; Wedler, H.

    1985-04-01

    In order to reach the full performance plasma parameters of ASDEX Upgrade as provided by the machine technique a heating power of 12 to 15 MW is required. For the minimum required power the appropriate choice for the basic heating system are 6 MW ICRH and 6 MW neutral injection, both with a long pulse capability of up to 10 seconds. ICRH in a frequency range of 30 to 120 MHz shall cover He 3 minority, hydrogen fundamental and 2nd harmonic and deuterium 2nd harmonic heating. For neutral injection four JET sources with 60 keV H 0 and 80 A combined in one injection box were chosen. The averaged injection angle is 24 0 to perpendicular at Rsub(O) = 1.7 m. Both systems shall be installed during 1988. The costs are 57.4 MDM for both. (orig./GG)

  14. Feasibility study for a postaccident heat removal facility

    International Nuclear Information System (INIS)

    Barts, E.W.; Apperson, C.E. Jr.; Dunwoody, W.E.; Bennett, J.G.

    1978-01-01

    An initial feasibility investigation for PAHRTEF, a Postaccident Heat Removal Test Facility, is presented. The facility would provide an experimental capability for PAHR experiments beyond that available in any currently existing or proposed U.S. safety test facility. The facility design presented in this report is based upon the technology developed for the ROVER nuclear rocket propulsion program. The core is a graphite-moderated, helium-cooled, epithermal core with radial reflector control. The PAHR experiments are located just below the reactor containment vessel, very near the bottom of the core. The experiments (up to 55% enriched) are driven and controlled by neutrons leaking axially from the core such that the PAHRTEF core and the experiment form a coupled reactor system. The experiment can be designed so that it is extremely unlikely that the test fuel by itself could form a critical system. The investigation indicates that adequate fission heating of large PAHR experiments could be provided at low driver core power levels. Both the reactor and the experiment handling and examination equipment can use available technology and, whenever possible, existing equipment and buildings

  15. Error analysis of thermocouple measurements in the Radiant Heat Facility

    International Nuclear Information System (INIS)

    Nakos, J.T.; Strait, B.G.

    1980-12-01

    The measurement most frequently made in the Radiant Heat Facility is temperature, and the transducer which is used almost exclusively is the thermocouple. Other methods, such as resistance thermometers and thermistors, are used but very rarely. Since a majority of the information gathered at Radiant Heat is from thermocouples, a reasonable measure of the quality of the measurements made at the facility is the accuracy of the thermocouple temperature data

  16. 77 FR 60041 - Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities

    Science.gov (United States)

    2012-10-02

    ... 1076-AF10 Heating, Cooling, and Lighting Standards for Bureau-Funded Dormitory Facilities AGENCY... confirming the interim final rule published and effective on May 24, 2012, addressing heating, cooling, and... identified in the ``School Facilities Design Handbook'' (handbook) dated March 30, 2007, respecting heating...

  17. Prioritizing and scheduling Portsmouth Gaseous Diffusion Plant safeguards upgrades

    International Nuclear Information System (INIS)

    Edmunds, T.; Saleh, R.; Zevanove, S.

    1992-02-01

    As part of the Site Safeguards and Security Plan (SSSP), facilities are required to develop a Resource Plan (RP). The Resource Plan provides documentation and justification for the facility's planned upgrades, including the schedule, priority, and cost estimates for the safeguards and security upgrades. Portsmouth Gaseous Diffusion Plant (PORTS) management has identified and obtained funding approval for a number of safeguards and security upgrades, including line-item construction projects. These upgrade projects were selected to address a variety of concerns identified in the PORTS vulnerability assessments and other reviews performed in support of the SSSP process. However, budgeting and scheduling constraints do not make it possible to simultaneously begin implementation of all of the upgrade projects. A formal methodology and analysis are needed to explicitly address the trade-offs between competing safeguards objectives, and to prioritize and schedule the upgrade projects to ensure that the maximum benefit can be realized in the shortest possible time frame. The purpose of this report is to describe the methodology developed to support these upgrade project scheduling decisions. The report also presents the results obtained from applying the methodology to a set of the upgrade projects selected by PORTS S ampersand S management. Data for the analysis are based on discussions with personnel familiar with the PORTS safeguards and security needs, the requirements for implementing these upgrades, and upgrade funding limitations. The analysis results presented here assume continued highly enriched uranium (HEU) operations at PORTS. However, the methodology developed is readily adaptable for the evaluation of other operational scenarios and other resource allocation issues relevant to PORTS

  18. Upgrade of the Annular Core Pulse Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Reuscher, J A [Sandia Laboratories, Albuquerque, NM (United States)

    1976-07-01

    The Annular Core Pulse Reactor (ACPR) is a TRIGA type reactor which has been in operation at Sandia Laboratories since 1967. The reactor is utilized in a wide variety of experimental programs which include radiation effects, neutron radiography, activation analysis, and fast reactor safety. During the past two years, the ACPR has become an important experimental facility for the United States Fast Reactor Safety Research Program and questions of interest to the safety of the LMFBR are being addressed. In order to enhance the capabilities of the ACPR for reactor safety experiments, a project to improve the performance of the reactor was initiated. It is anticipated that the pulse fluence can be increased by a factor of 2.0 to 2.5 by utilizing a two-region core concept with high heat capacity fuel elements around the central irradiation cavity. In addition, the steady-state power of the reactor will be increased by about a factor of two. Preliminary studies have identified several potential approaches to the ACPR performance improvement. The most promising approach appears to be the two-region core concept. The inner region, surrounding the irradiation cavity, would consist of a high-heat capacity fuel capable of absorbing the fission energy associated with a large nuclear pulse. The number of fissions occurring near the cavity would be greatly increased which, in turn, would significantly increase the fluence in the cavity. The outer region would consist of a U-ZrH fuel to provide an overall negative temperature coefficient for the two region core. Two candidate high heat capacity fuels [(BeO-UO{sub 2} and UC-ZrC) - graphite] are under consideration. Since this reactor upgrade represents a modification to an existing facility, it can be achieved in a relatively short time. It is anticipated that most of the existing reactor structure can be used for the upgrade. The present core occupies about one-half of the location in the grid plate. The high-heat capacity fuel

  19. Circular waveguide systems for electron-cyclotron-resonant heating of the tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Felker, B.; Calderon, M.O.; Chargin, A.K.

    1983-01-01

    Extensive use of electron cyclotron resonant heating (ECRH) in the Tandem Mirror Experiment-Upgrade (TMX-U) requires continuous development of components to improve efficiency, increase reliability, and deliver power to new locations with respect to the plasma. We have used rectangular waveguide components on the experiment and have developed, tested, and installed circular waveguide components. We replaced the rectangular with the circular components because of the greater transmission efficiency and power-handling capability of the circular ones. Design, fabrication, and testing of all components are complete for all systems. In this paper we describe the design criteria for the system

  20. Upgrading the data acquisition and control systems of the European Breeding Blanket Test Facility

    International Nuclear Information System (INIS)

    Mannori, Simone; Sermenghi, Valerio; Utili, Marco; Malavasi, Andrea; Gianotti, Daniel

    2013-01-01

    Highlights: • Data Acquisition and Control Systems (DACS) upgrading of experimental plant for full size thermo hydraulic testing of nuclear subsystems. • DACS development using integrated hardware/software platform with graphical programming (LabVIEW). • Development of simplified models for real-time simulation. • Rapid prototyping with real time simulation of the complete plant. • Using the code developed for the real time simulator for the real plant DACS. -- Abstract: The EBBTF (European Breeding Blanket Test Facility) experimental plant is a key component for the development of the breeding blankets (TBMs test blanket modules, HCLL helium cooled lithium lead and HCPB helium cooled pebble bed types) used by ITER. EBBTF is an experimental plant which provides the double breeding/cooling loops (liquid metal and gas) required for HCLL testing. EBBTF is composed of four subsystems (TBM, IELLLO integrated European lead lithium loop, HE-FUS3 helium fusion loop, version 3 and helium compressor build by ATEKO) with dedicated control systems realized with hardware/software combinations covering 15 years (1995–2010) time span. At the end of 2010 we began to upgrade the HE-FUS3 data acquisition control systems (DACS) replacing the obsolete PLC Siemens S5 with National Instruments Compact FieldPoint and LabVIEW. The control room has been completely reorganized using high resolution monitors and workstations linked with standard Ethernet interfaces. The data acquisition, control, safety and SCADA software has been completely developed in ENEA using LabVIEW. In this paper we are going to discuss the technical difficulties and the solutions that we have used to accomplish the upgrade

  1. Microwave measurement test results of circular waveguide components for electron cyclotron resonant heating (ECRH) of the Tandem Mirror Experiment-Upgrade (TMX-U)

    International Nuclear Information System (INIS)

    Williams, C.W.; Rubert, R.R.; Coffield, F.E.; Felker, B.; Stallard, B.W.; Taska, J.

    1983-01-01

    Development of high-power components for electron cyclotron resonant heating (ECRH) applications requires extensive testing. In this paper we describe the high-power testing of various circular waveguide components designed for application on the Tandem Mirror Experiment-Upgrade (TMX-U). These include a 2.5-in. vacuum valve, polarizing reflectors, directional couplers, mode converters, and flexible waveguides. All of these components were tested to 200 kW power level with 40-ms pulses. Cold tests were used to determine field distribution. The techniques used in these tests are illustrated. The new high-power test facility at Lawrence Livermore National Laboratory (LLNL) is described and test procedures are discussed. We discuss the following test results: efficiency at high power of mode converters, comparison of high power vs low power for waveguide components, and full power tests of the waveguide system. We also explain the reasons behind selection of these systems for use on TMX-U

  2. Snowflake divertor configuration studies for NSTX-Upgrade

    International Nuclear Information System (INIS)

    Soukhanovskii, V.A.

    2011-01-01

    Snowflake divertor experiments in NSTX provide basis for PMI development toward NSTX-Upgrade. Snowflake configuration formation was followed by radiative detachment. Significant reduction of steady-state divertor heat flux observed in snowflake divertor. Impulsive heat loads due to Type I ELMs are partially mitigated in snowflake divertor. Magnetic control of snowflake divertor configuration is being developed. Plasma material interface development is critical for NSTX-U success. Four divertor coils should enable flexibility in boundary shaping and control in NSTX-U. Snowflake divertor experiments in NSTX provide good basis for PMI development in NSTX-Upgrade. FY 2009-2010 snowflake divertor experiments in NSTX: (1) Helped understand control of magnetic properties; (2) Core H-mode confinement unchanged; (3) Core and edge carbon concentration reduced; and (4) Divertor heat flux significantly reduced - (a) Steady-state reduction due to geometry and radiative detachment, (b) Encouraging results for transient heat flux handling, (c) Combined with impurity-seeded radiative divertor. Outlook for snowflake divertor in NSTX-Upgrade: (1) 2D fluid modeling of snowflake divertor properties scaling - (a) Edge and divertor transport, radiation, detachment threshold, (b) Compatibility with cryo-pump and lithium conditioning; (2) Magnetic control development; and (3) PFC development - PFC alignment and PFC material choice.

  3. Heat removal tests on dry storage facilities for nuclear spent fuels

    International Nuclear Information System (INIS)

    Wataru, M.; Saegusa, T.; Koga, T.; Sakamoto, K.; Hattori, Y.

    1999-01-01

    In Japan, spent fuel generated in NPP is controlled and stored in dry storage facility away-from reactor. Natural convection cooling system of the storage facility is considered advantageous from both safety and economic point of view. In order to realize this type of facility it is necessary to develop an evaluation method for natural convection characteristics and to make a rational design taking account safety and economic factors. Heat removal tests with the reduces scale models of storage facilities (cask, vault and silo) identified the the flow pattern in the test modules. The temperature and velocity distributions were obtained and the heat transfer characteristics were evaluated

  4. Micro-Combined Heat and Power Device Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — NIST has developed a test facility for micro-combined heat and power (micro-CHP) devices to measure their performance over a range of different operating strategies...

  5. Safety upgrades to the NRU research reactor

    International Nuclear Information System (INIS)

    DeAbreu, B.; Mark, J.M.; Mutterback, E.J.

    1998-01-01

    The NRU (National Research Universal) Reactor is a 135 MW thermal research facility located at Chalk River Laboratories, and is owned and operated by Atomic Energy of Canada Limited. One of the largest and most versatile research reactors in the world, it serves as the R and D workhorse for Canada's CANDU business while at the same time filling the role as one of the world's major producers of medical radioisotopes. AECL plans to extend operation of the NRU reactor to approximately the year 2005 when a new replacement, the Irradiation Research Facility (IRF) will be available. To achieve this, AECL has undertaken a program of safety reassessment and upgrades to enhance the level of safety consistent with modem requirements. An engineering assessment/inspection of critical systems, equipment and components was completed and seven major safety upgrades are being designed and installed. These upgrades will significantly reduce the reactor's vulnerability to common mode failures and external hazards, with particular emphasis on seismic protection. The scheduled completion date for the project is 1999 December at a cost approximately twice the annual operating cost. All work on the NRU upgrade project is planned and integrated into the regular operating cycles of the reactor; no major outages are anticipated. This paper describes the safety upgrades and discusses the technical and managerial challenges involved in extending the operating life of the NRU reactor. (author)

  6. FEM investigation and thermo-mechanic tests of the new solid tungsten divertor tile for ASDEX Upgrade

    International Nuclear Information System (INIS)

    Jaksic, Nikola; Greuner, Henri; Herrmann, Albrecht

    2013-01-01

    Highlights: • New solid tungsten divertor for fusion experiment ASDEX Upgrade. • Design validation in the high heat flux (HHF) test facility GLADIS (Garching Large Divertor Sample Test Facility). • FEA simulation. -- Abstract: A new solid tungsten divertor for the fusion experiment ASDEX Upgrade is under construction at present. A new divertor tile design has been developed to improve the thermal performance of the current divertor made of tungsten coated fine grain graphite. Compared to thin tungsten coatings, divertor tiles made of massive tungsten allow to extend the operational range and to study the plasma material interaction of tungsten in more detail. The improved design for the solid tungsten divertor was tested on different full scale prototypes with a hydrogen ion beam. The influence of a possible material degradation due to thermal cracking or recrystallization can be studied. Furthermore, intensive Finite Element Method (FEM) numerical analysis with the respective test parameters has been performed. The elastic–plastic calculation was applied to analyze thermal stress and the observed elastic and plastic deformation during the heat loading. Additionally, the knowledge gained by the tests and especially by the numerical analysis has been used to optimize the shape of the divertor tiles and the accompanying divertor support structure. This paper discusses the main results of the high heat flux tests and their numerical simulations. In addition, results from some special structural mechanic analysis by means of FEM tools are presented. Finally, first results from the numerical lifecycle analysis of the current tungsten tiles will be reported

  7. 2D heat flux pattern in ASDEX upgrade L-mode with magnetic perturbation

    Energy Technology Data Exchange (ETDEWEB)

    Faitsch, Michael; Sieglin, Bernhard; Eich, Thomas; Herrmann, Albrecht; Suttrop, Wolfgang [Max-Planck-Institute for Plasma Physics, Boltzmannstr. 2, D-85748 Garching (Germany); Collaboration: the ASDEDX Upgrade Team

    2016-07-01

    A future fusion reactor is likely to operate in high confinement mode (H-mode). This mode is associated with a periodic instability at the plasma edge that expels particles and energy. This instability is called edge localized mode (ELM). External magnetic perturbation (MP) is one technique that is thought to be able to mitigate or even suppress large ELMs in next step fusion devices such as ITER, where the ELM induced heat load for unmitigated ELMs might limit the lifetime of the divertor. Applying an external magnetic perturbation breaks the axisymmetry and leads to a 2D steady state heat flux pattern at the divertor. The ASDEX Upgrade tokamak is equipped with 16 perturbation coils, 8 above (upper row) and 8 below (lower row) the outer mid plane, toroidal equally distributed. A high resolution infra red system is measuring the heat flux at the outer target at a fixed toroidal position with a resolution of around 0.6 mm. In order to measure the 2D structure a slow rotation of the MP field was applied (1 Hz) with a toroidal mode number n=2. The differential phase between the upper and lower row was changed to investigate the effect of the alignment with the field lines at the edge. The density was varied to study the density dependence of the heat transport with applied external MP and compare it to the axisymmetric scenario.

  8. Feedback-controlled NTM stabilization on ASDEX Upgrade

    Directory of Open Access Journals (Sweden)

    Stober J.

    2015-01-01

    Full Text Available On ASDEX Upgrade a concept for real-time stabilization of NTMs has been realized and successfully applied to (3,2- and (2,1-NTMs. Since most of the work has meanwhile been published elsewhere, a short summary with the appropriate references is given. Limitations, deficits and future extensions of the system are discussed. In a second part the recent work on using modulated ECCD for NTM stabilisation is described in some detail. In these experiments ECCD power is modulated according to a magnetic footprint of the rotating NTM. In agreement with earlier results it could be shown that O-point heating reduces the necessary average power for stabilisation whereas X-point heating hampers stabilisation. Although this modulated scheme is not relevant for routine NTM stabilisation on ASDEX Upgrade it may be mandatory for ITER or DEMO. On ASDEX Upgrade it has been re-developed to demonstrate the usage of a FAst DIrectional Switch to continously heat the O-point of the rotating island with only one gyrotron switching between two launchers which target the mode at locations separated in phase by 180 degrees as described in [1].

  9. Heat transfer performance test of PDHRS heat exchangers of PGSFR using STELLA-1 facility

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Jonggan, E-mail: hong@kaeri.re.kr; Yeom, Sujin; Eoh, Jae-Hyuk; Lee, Tae-Ho; Jeong, Ji-Young

    2017-03-15

    Highlights: • Heat transfer performance test of heat exchangers of PGSFR PDHRS is conducted using STELLA-1 facility. • Steady-state test results of DHX and AHX show good agreement with theoretical results of design codes. • Design codes for DHX and AHX are validated by STELLA-1 experimental results. • Heat transport capability of DHX and AHX is turned out to be satisfactory for reliable plant operation. - Abstract: The STELLA-1 facility was designed and constructed to carry out separate effect tests of the decay heat exchanger (DHX) and natural draft sodium-to-air heat exchanger (AHX), which are key components of the safety-grade decay heat removal system in PGSFR. The DHX is a sodium-to-sodium heat exchanger with a straight tube arrangement, and the AHX is a sodium-to-air heat exchanger with a helically coiled tube arrangement. The model heat exchangers in STELLA-1 have been designed to meet their own similitude conditions from the prototype ones, of which scale ratios were set to be unity in height (or length) and 1/2.5 in heat transfer rate. Consequently, the overall heat transfer coefficients and log-mean temperature differences of the prototypes have been preserved as well. The steady-state test results for each model heat exchanger obtained from STELLA-1 showed good agreement with the theoretical results of the computer design codes for thermal-sizing and a performance analysis of the DHX and AHX. In the DHX result comparison, the discrepancies in the heat transfer rate ranged from −4.4% to 2.0%, and in the AHX result comparison, they ranged from −11.1% to 12.6%. Therefore, the first step in thermal design codes validation for sodium heat exchangers, e.g., DHX and AHX, has been successfully completed with the experimental database obtained from STELLA-1. In addition, the heat transfer performance of the DHX and AHX was found to be satisfactory enough to secure a reliable decay heat removal performance.

  10. Overview of the TCV tokamak program: scientific progress and facility upgrades

    Science.gov (United States)

    Coda, S.; Ahn, J.; Albanese, R.; Alberti, S.; Alessi, E.; Allan, S.; Anand, H.; Anastassiou, G.; Andrèbe, Y.; Angioni, C.; Ariola, M.; Bernert, M.; Beurskens, M.; Bin, W.; Blanchard, P.; Blanken, T. C.; Boedo, J. A.; Bolzonella, T.; Bouquey, F.; Braunmüller, F. H.; Bufferand, H.; Buratti, P.; Calabró, G.; Camenen, Y.; Carnevale, D.; Carpanese, F.; Causa, F.; Cesario, R.; Chapman, I. T.; Chellai, O.; Choi, D.; Cianfarani, C.; Ciraolo, G.; Citrin, J.; Costea, S.; Crisanti, F.; Cruz, N.; Czarnecka, A.; Decker, J.; De Masi, G.; De Tommasi, G.; Douai, D.; Dunne, M.; Duval, B. P.; Eich, T.; Elmore, S.; Esposito, B.; Faitsch, M.; Fasoli, A.; Fedorczak, N.; Felici, F.; Février, O.; Ficker, O.; Fietz, S.; Fontana, M.; Frassinetti, L.; Furno, I.; Galeani, S.; Gallo, A.; Galperti, C.; Garavaglia, S.; Garrido, I.; Geiger, B.; Giovannozzi, E.; Gobbin, M.; Goodman, T. P.; Gorini, G.; Gospodarczyk, M.; Granucci, G.; Graves, J. P.; Guirlet, R.; Hakola, A.; Ham, C.; Harrison, J.; Hawke, J.; Hennequin, P.; Hnat, B.; Hogeweij, D.; Hogge, J.-Ph.; Honoré, C.; Hopf, C.; Horáček, J.; Huang, Z.; Igochine, V.; Innocente, P.; Ionita Schrittwieser, C.; Isliker, H.; Jacquier, R.; Jardin, A.; Kamleitner, J.; Karpushov, A.; Keeling, D. L.; Kirneva, N.; Kong, M.; Koubiti, M.; Kovacic, J.; Krämer-Flecken, A.; Krawczyk, N.; Kudlacek, O.; Labit, B.; Lazzaro, E.; Le, H. B.; Lipschultz, B.; Llobet, X.; Lomanowski, B.; Loschiavo, V. P.; Lunt, T.; Maget, P.; Maljaars, E.; Malygin, A.; Maraschek, M.; Marini, C.; Martin, P.; Martin, Y.; Mastrostefano, S.; Maurizio, R.; Mavridis, M.; Mazon, D.; McAdams, R.; McDermott, R.; Merle, A.; Meyer, H.; Militello, F.; Miron, I. G.; Molina Cabrera, P. A.; Moret, J.-M.; Moro, A.; Moulton, D.; Naulin, V.; Nespoli, F.; Nielsen, A. H.; Nocente, M.; Nouailletas, R.; Nowak, S.; Odstrčil, T.; Papp, G.; Papřok, R.; Pau, A.; Pautasso, G.; Pericoli Ridolfini, V.; Piovesan, P.; Piron, C.; Pisokas, T.; Porte, L.; Preynas, M.; Ramogida, G.; Rapson, C.; Rasmussen, J. Juul; Reich, M.; Reimerdes, H.; Reux, C.; Ricci, P.; Rittich, D.; Riva, F.; Robinson, T.; Saarelma, S.; Saint-Laurent, F.; Sauter, O.; Scannell, R.; Schlatter, Ch.; Schneider, B.; Schneider, P.; Schrittwieser, R.; Sciortino, F.; Sertoli, M.; Sheikh, U.; Sieglin, B.; Silva, M.; Sinha, J.; Sozzi, C.; Spolaore, M.; Stange, T.; Stoltzfus-Dueck, T.; Tamain, P.; Teplukhina, A.; Testa, D.; Theiler, C.; Thornton, A.; Tophøj, L.; Tran, M. Q.; Tsironis, C.; Tsui, C.; Uccello, A.; Vartanian, S.; Verdoolaege, G.; Verhaegh, K.; Vermare, L.; Vianello, N.; Vijvers, W. A. J.; Vlahos, L.; Vu, N. M. T.; Walkden, N.; Wauters, T.; Weisen, H.; Wischmeier, M.; Zestanakis, P.; Zuin, M.; the EUROfusion MST1 Team

    2017-10-01

    The TCV tokamak is augmenting its unique historical capabilities (strong shaping, strong electron heating) with ion heating, additional electron heating compatible with high densities, and variable divertor geometry, in a multifaceted upgrade program designed to broaden its operational range without sacrificing its fundamental flexibility. The TCV program is rooted in a three-pronged approach aimed at ITER support, explorations towards DEMO, and fundamental research. A 1 MW, tangential neutral beam injector (NBI) was recently installed and promptly extended the TCV parameter range, with record ion temperatures and toroidal rotation velocities and measurable neutral-beam current drive. ITER-relevant scenario development has received particular attention, with strategies aimed at maximizing performance through optimized discharge trajectories to avoid MHD instabilities, such as peeling-ballooning and neoclassical tearing modes. Experiments on exhaust physics have focused particularly on detachment, a necessary step to a DEMO reactor, in a comprehensive set of conventional and advanced divertor concepts. The specific theoretical prediction of an enhanced radiation region between the two X-points in the low-field-side snowflake-minus configuration was experimentally confirmed. Fundamental investigations of the power decay length in the scrape-off layer (SOL) are progressing rapidly, again in widely varying configurations and in both D and He plasmas; in particular, the double decay length in L-mode limited plasmas was found to be replaced by a single length at high SOL resistivity. Experiments on disruption mitigation by massive gas injection and electron-cyclotron resonance heating (ECRH) have begun in earnest, in parallel with studies of runaway electron generation and control, in both stable and disruptive conditions; a quiescent runaway beam carrying the entire electrical current appears to develop in some cases. Developments in plasma control have benefited from

  11. Alberta oil sands crudes : upgrading and marketing

    International Nuclear Information System (INIS)

    Ashar, M.

    2008-01-01

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs

  12. Alberta oil sands crudes : upgrading and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Ashar, M. [Suncor Energy, Fort McMurray, AB (Canada)

    2008-05-15

    Open pit mining and in situ techniques, such as steam stimulation, are used to recover Alberta's bitumen and heavy oil resources, which have higher viscosities than conventional hydrocarbons. The bitumen is typically upgraded to synthetic crude oil (SCO). In the simplest processing scheme, the bitumen is blended with diluent for ease in pipeline transport and then processed at refineries with upgrading facilities. The bitumen is also upgraded to light SCO at world-scale upgraders in Alberta. The SCO is then processed at refineries in downstream markets. The 2 categories of upgrading, notably primary and secondary upgrading, were described in this article along with technology options for both categories. Slurry hydrocracking is regarded as the most interesting emerging residual fuel upgrading technology. It combines special catalyst mixes with the latest slurry reactor designs as well as innovative catalyst capture and recycle schemes to produce very high conversions and potentially superior upgrading economics. The increase in volume and rate of SCO from Alberta provides refiners in the oil sands marketing sector an unprecedented choice of opportunities to improve profitability. Key trends indicate that production will increase substantially from 2008 to 2030. 5 figs.

  13. Influence of RF heating and MHD instabilities on the fast-ion distribution in ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Weiland, Markus

    2016-06-07

    Fast, supra-thermal ions provide a powerful mechanism to heat fusion plasmas. Through Coulomb collisions with the thermal bulk plasma, they slow down and transfer their energy to the plasma. In present-day devices, fast ions are generated by neutral beam injection (NBI) and ion cyclotron resonance heating (ICRH). In future fusion reactors, the dominant heating source, which allows the ignition of a burning plasma, will be fast a-particles resulting from fusion reactions. In addition to plasma heating, fast ions can be utilized to drive plasma currents and rotation. It is therefore crucial for the success of future fusion devices (such as ITER and DEMO) to understand the physics of fast ions and ensure their safe confinement. This thesis focuses both on modeling and experimental aspects. A model to calculate the NBI fast-ion distribution rapidly has been developed. It is based on a combination of existing codes and analytic solutions. Due to the comparably low numerical effort, it can be used to calculate the fast-ion distribution in a large set of discharges, which is used to e.g. improve plasma equilibrium reconstructions. Experimentally, the physics of fast ions is investigated at the tokamak ASDEX Upgrade, using a FIDA (Fast-Ion D-Alpha) spectroscopy diagnostic. This diagnostic technique is based on charge-exchange reactions, that convert the ions into neutral atoms (keeping their momenta). The light emission from these neutral atoms can be collected by optics in the machine and analyzed with spectrometers. Here, the fast-ion contribution can be identified due to large Doppler shifts, and the shape of the spectrum yields information about the velocity distribution. The Doppler shift is given by a projection of the ion velocity vector onto the line of sight, such that observation from different viewing angles is needed to cover the entire velocity space. Therefore, the FIDA diagnostic has been upgraded from three viewing arrays to five, and the spectrometer has

  14. Influence of RF heating and MHD instabilities on the fast-ion distribution in ASDEX upgrade

    International Nuclear Information System (INIS)

    Weiland, Markus

    2016-01-01

    Fast, supra-thermal ions provide a powerful mechanism to heat fusion plasmas. Through Coulomb collisions with the thermal bulk plasma, they slow down and transfer their energy to the plasma. In present-day devices, fast ions are generated by neutral beam injection (NBI) and ion cyclotron resonance heating (ICRH). In future fusion reactors, the dominant heating source, which allows the ignition of a burning plasma, will be fast a-particles resulting from fusion reactions. In addition to plasma heating, fast ions can be utilized to drive plasma currents and rotation. It is therefore crucial for the success of future fusion devices (such as ITER and DEMO) to understand the physics of fast ions and ensure their safe confinement. This thesis focuses both on modeling and experimental aspects. A model to calculate the NBI fast-ion distribution rapidly has been developed. It is based on a combination of existing codes and analytic solutions. Due to the comparably low numerical effort, it can be used to calculate the fast-ion distribution in a large set of discharges, which is used to e.g. improve plasma equilibrium reconstructions. Experimentally, the physics of fast ions is investigated at the tokamak ASDEX Upgrade, using a FIDA (Fast-Ion D-Alpha) spectroscopy diagnostic. This diagnostic technique is based on charge-exchange reactions, that convert the ions into neutral atoms (keeping their momenta). The light emission from these neutral atoms can be collected by optics in the machine and analyzed with spectrometers. Here, the fast-ion contribution can be identified due to large Doppler shifts, and the shape of the spectrum yields information about the velocity distribution. The Doppler shift is given by a projection of the ion velocity vector onto the line of sight, such that observation from different viewing angles is needed to cover the entire velocity space. Therefore, the FIDA diagnostic has been upgraded from three viewing arrays to five, and the spectrometer has

  15. Hybrid Wing Body Aircraft Acoustic Test Preparations and Facility Upgrades

    Science.gov (United States)

    Heath, Stephanie L.; Brooks, Thomas F.; Hutcheson, Florence V.; Doty, Michael J.; Haskin, Henry H.; Spalt, Taylor B.; Bahr, Christopher J.; Burley, Casey L.; Bartram, Scott M.; Humphreys, William M.; hide

    2013-01-01

    NASA is investigating the potential of acoustic shielding as a means to reduce the noise footprint at airport communities. A subsonic transport aircraft and Langley's 14- by 22-foot Subsonic Wind Tunnel were chosen to test the proposed "low noise" technology. The present experiment studies the basic components of propulsion-airframe shielding in a representative flow regime. To this end, a 5.8-percent scale hybrid wing body model was built with dual state-of-the-art engine noise simulators. The results will provide benchmark shielding data and key hybrid wing body aircraft noise data. The test matrix for the experiment contains both aerodynamic and acoustic test configurations, broadband turbomachinery and hot jet engine noise simulators, and various airframe configurations which include landing gear, cruise and drooped wing leading edges, trailing edge elevons and vertical tail options. To aid in this study, two major facility upgrades have occurred. First, a propane delivery system has been installed to provide the acoustic characteristics with realistic temperature conditions for a hot gas engine; and second, a traversing microphone array and side towers have been added to gain full spectral and directivity noise characteristics.

  16. TMX-Upgrade vacuum-system design and analysis

    International Nuclear Information System (INIS)

    Simonen, T.C.; Chargin, A.K.; Drake, R.P.; Nexsen, W.E.; Pickles, W.L.; Poulsen, P.; Stack, T.P.; Wong, R.L.

    1981-10-01

    This paper describes the design and analysis of the TMX Upgrade Vacuum System. TMX Upgrade is a modification of the TMX tandem mirror device. It will employ thermal barriers to further improve plasma confinement. Thermal barriers are produced by microwave heating and neutral-beam pumping. They increase the feasibility of tandem-mirror reactors by reducing both the required magnetic field strengths and the neutral-beam injection voltages

  17. Measuring main-ion temperatures in ASDEX upgrade using scattering of ECRH radiation

    DEFF Research Database (Denmark)

    Pedersen, Morten Stejner; Nielsen, Stefan Kragh; Jacobsen, Asger Schou

    2016-01-01

    We demonstrate that collective Thomson scattering of millimeter wave electron cyclotron resonance heating radiation can be used for measurements of the main-ion temperature in the ASDEX Upgrade tokamak.......We demonstrate that collective Thomson scattering of millimeter wave electron cyclotron resonance heating radiation can be used for measurements of the main-ion temperature in the ASDEX Upgrade tokamak....

  18. Laser heated solenoid as a neutron source facility

    International Nuclear Information System (INIS)

    Steinhauer, L.C.; Rose, P.H.

    1975-01-01

    Conceptual designs are presented for a radiation test facility based on a laser heated plasma confined in a straight solenoid. The thin plasma column, a few meters in length and less than a centimeter in diameter, serves as a line source of neutrons. Test samples are located within or just behind the plasma tube, at a radius of 1-2 cm from the axis. The plasma is heated by an axially-directed powerful long-wavelength laser beam. The plasma is confined radially in the intense magnetic field supplied by a pulsed solenoid surrounding the plasma tube. The facility is pulsed many times a second to achieve a high time-averaged neutron flux on the test samples. Based on component performance achievable in the near term (e.g., magnetic field, laser pulse energy) and assuming classical physical processes, it appears that average fluxes of 10 13 to 10 14 neutrons/cm 2 -sec can be achieved in such a device. The most severe technical problems in such a facility appear to be rapid pulsing design and lifetime of some electrical and laser components

  19. Recent ECRH results in ASDEX upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Dux, R.; Gantenbein, G.

    2003-01-01

    This paper provides an overview on recent experimental results obtained in ASDEX Upgrade using electron cyclotron heating and current drive. The following topics are covered: determination of the power deposition profile, modulated power deposition, studies of the electron heat transport via power balance and heat wave analysis and a comparison with turbulent transport theory, generation of an internal transport barrier for the electron heat flux, impact of electron cyclotron resonance heating (ECRH) on particle and impurity transport, and studies related to neoclassical tearing modes and to sawteeth. (author)

  20. National RF Test Facility as a multipurpose development tool

    International Nuclear Information System (INIS)

    McManamy, T.J.; Becraft, W.R.; Berry, L.A.

    1983-01-01

    Additions and modifications to the National RF Test Facility design have been made that (1) focus its use for technology development for future large systems in the ion cyclotron range of frequencies (ICRF), (2) expand its applicability to technology development in the electron cyclotron range of frequencies (ECRF) at 60 GHz, (3) provide a facility for ELMO Bumpy Torus (EBT) 60-GHz ring physics studies, and (4) permit engineering studies of steady-state plasma systems, including superconducting magnet performance, vacuum vessel heat flux removal, and microwave protection. The facility will continue to function as a test bed for generic technology developments for ICRF and the lower hybrid range of frequencies (LHRF). The upgraded facility is also suitable for mirror halo physics experiments

  1. Catalytic upgrading of bio-oil produced from hydrothermal liquefaction of Nannochloropsis sp.

    Science.gov (United States)

    Shakya, Rajdeep; Adhikari, Sushil; Mahadevan, Ravishankar; Hassan, El Barbary; Dempster, Thomas A

    2018-03-01

    Upgrading of bio-oil obtained from hydrothermal liquefaction (HTL) of algae is necessary for it to be used as a fuel. In this study, bio-oil obtained from HTL of Nannochloropsis sp. was upgraded using five different catalysts (Ni/C, ZSM-5, Ni/ZSM-5, Ru/C and Pt/C) at 300 °C and 350 °C. The upgraded bio-oil yields were higher at 300 °C; however, higher quality upgraded bio-oils were obtained at 350 °C. Ni/C gave the maximum upgraded bio-oil yield (61 wt%) at 350 °C. However, noble metal catalysts (Ru/C and Pt/C) gave the better upgraded bio-oils in terms of acidity, heating values, and nitrogen values. The higher heating value of the upgraded bio-oils ranged from 40 to 44 MJ/kg, and the nitrogen content decreased from 5.37 to 1.29 wt%. Most of the upgraded bio-oils (35-40 wt%) were in the diesel range. The major components present in the gaseous products were CH 4 , CO, CO 2 and lower alkanes. Copyright © 2017 Elsevier Ltd. All rights reserved.

  2. Development of upgraded brown coal process

    Energy Technology Data Exchange (ETDEWEB)

    Komatsu, N.; Sugita, S.; Deguchi, T.; Shigehisa, T.; Makino, E. [Kobe Steel Ltd., Hyogo (Japan). Coal and Energy Project Department

    2004-07-01

    Half of the world's coal resources are so-called low rank coal (LRC) such as lignite, subbituminous coal. Utilization of such coal is limited due to low heat value and high propensity of spontaneous combustion. Since some of LRCs have advantages as clean coal, i.e. low ash and low sulfur content, LRC can be the excellent feedstock for power generation and metallurgy depending on the upgrading technology. The UBC (upgraded brown coal) process introduced here converts LRC to solid fuel with high heat value and less propensity of self-heating. Various world coals, such as Australian, Indonesian and USA LRC, were tested using the Autoclave and Bench Scale Unit, and the process application to LRC of wide range is proven. The R & D activities of the UBC process are introduced including a demonstration project with a 5 ton/day test plant in progress in Indonesia, expecting near future commercialisation in order to utilize abundant LRC of clean properties. 8 refs., 12 figs., 3 tabs.

  3. Pulse mitigation and heat transfer enhancement techniques. Volume 3: Liquid sodium heat transfer facility and transient response of sodium heat pipe to pulse forward and reverse heat load

    Science.gov (United States)

    Chow, L. C.; Hahn, O. J.; Nguyen, H. X.

    1992-08-01

    This report presents the description of a liquid sodium heat transfer facility (sodium loop) constructed to support the study of transient response of heat pipes. The facility, consisting of the loop itself, a safety system, and a data acquisition system, can be safely operated over a wide range of temperature and sodium flow rate. The transient response of a heat pipe to pulse heat load at the condenser section was experimentally investigated. A 0.457 m screen wick, sodium heat pipe with an outer diameter of 0.127 m was tested under different heat loading conditions. A major finding was that the heat pipe reversed under a pulse heat load applied at the condenser. The time of reversal was approximately 15 to 25 seconds. The startup of the heat pipe from frozen state was also studied. It was found that during the startup process, at least part of the heat pipe was active. The active region extended gradually down to the end of the condenser until all of the working fluid in the heat pipe was molten.

  4. SYSTEM DESIGN AND PERFORMANCE FOR THE RECENT DIII-D NEUTRAL BEAM COMPUTER UPGRADE

    International Nuclear Information System (INIS)

    PHILLIPS, J.C; PENAFLOR, B.G; PHAM, N.Q; PIGLOWSKI, D.A.

    2004-03-01

    OAK-B135 This operating year marks an upgrade to the computer system charged with control and data acquisition for neutral beam injection system's heating at the DIII-D National Fusion Facility, funded by the US Department of Energy and operated by General Atomics (GA). This upgrade represents the third and latest major revision to a system which has been in service over twenty years. The first control and data acquisition computers were four 16 bit mini computers running a proprietary operating system. Each of the four controlled two ion source over dedicated CAMAC highway. In a 1995 upgrade, the system evolved to be two 32 bit Motorola mini-computers running a version of UNIX. Each computer controlled four ion sources with two CAMAC highways per CPU. This latest upgrade builds on this same logical organization, but makes significant advances in cost, maintainability, and the degree to which the system is open to future modification. The new control and data acquisition system is formed of two 2 GHz Intel Pentium 4 based PC's, running the LINUX operating system. Each PC drives two CAMAC serial highways using a combination of Kinetic Systems PCI standard CAMAC Hardware Drivers and a low-level software driver written in-house expressly for this device. This paper discusses the overall system design and implementation detail, describing actual operating experience for the initial six months of operation

  5. Ensuring preservation of nuclear materials at RT plant storage facilities by upgrading physical protection, containment (TID) and TV surveillance measures

    International Nuclear Information System (INIS)

    Savin, A.A.

    1999-01-01

    The upgrading of nuclear material (NM) physical protection system of storage facilities for plutonium dioxide has been carried out in the frame of contract between Sandia National Laboratories and PA Mayak. The implementation of this project is of great importance for ensuring the preservation of NM in storage. The project envisages a complex approach to the solution of the task: the use of engineered fences, detection means, observation devices, access and control thereof for the personnel; the organization of security force in such way that to give a possibility to take adequate and purposeful actions towards possible adversaries. The design includes upgrading the system for physical protection through the introduction of modern, efficient engineering devices for security, integrated system for access control and security, the system for TV surveillance [ru

  6. Upgrading activities for the HFR Petten

    International Nuclear Information System (INIS)

    Ahlf, J.

    1990-01-01

    The HFR in Petten, the Netherlands, is a water cooled and moderated research reactor. It has been in continuous and successful operation for more than 25 years. The reactor is utilized as a multi-purpose research reactor with a predominance of materials testing for fission and fusion energy. It has been continuous policy to keep the installation up to date by implementing technical developments and by refurbishing or replacing all components and equipment which approach the end of their useful life. In addition the facilities and the ancillary experimental equipment are continuously adapted and kept versatile in view of changing requirements from the experimental programmes. Performance upgrading comprised increasing the power in two steps to 30 MW and now 45 MW, accompanied by improving the core loading pattern in order to provide an increasing number of high flux irradiation positions. These improvements were rendered possible because of achievements in fuel element design and manufacture. In the mid 70's it became apparent that embrittlement of the reactor vessel material would become a licensing problem. A decision was taken to replace the old vessel by a new one which then could take into account recent experience with respect to experimental requirements. After the vessel replacement a programme was started to replace other ageing components. The primary heat exchangers and the pool heat exchanger have been replaced recently; replacement of the beryllium reflector is nearly finished. All the nuclear instrumentation channels have been replaced. Repair or refurbishment of peripheral equipment such as the outlet line for secondary cooling, the guaranteed power supply for the reactor and the fire prevention system is under preparation. Because all upgrading actions were carefully planned well in advance of actual component failures, unanticipated outages could be avoided

  7. Coal upgrading based on the high temperature reactor - engineering and economic aspects

    International Nuclear Information System (INIS)

    Barnert, H.; Neis, H.

    1987-01-01

    The development of the high temperature reactor in the FRG was opened with the aim of economically producing electricity which might be achieved with the next project works. Moreover, the HTR supplies process heat of very high temperature which may be used with metallic heat exchangers in the range up to 1000 0 C. From these reasons and regarding the world power prospects and the special power situation in our own country, the FRG began to develop methods of upgrading fossil primary energy sources using high-temperature heat from the HTR about 15 years ago. Meanwhile great progress has been achieved in research, development and test works; the modules are developed to a great extent. Economical service is expected for future utilization of selected processes. Problems to be still accomplished are first of all related to system testing as well as further exhaustion of the HTR's temperature potential. The proposed extension of the AVR to some process heat facility offers the possibility of testing the system in a low-cost and accelerated manner. (author)

  8. Laser heated solenoid proof-of-concept experiment (PCX) facility

    International Nuclear Information System (INIS)

    DeHart, T.E.; Zumdieck, J.F.; Hoffman, A.L.; Lowenthal, D.D.; Crawford, E.A.; Parry, B.

    1977-01-01

    The total facility, including laser, magnet, focusing optics, instrumentation and control, its design problems, and its current performance are discussed. Preliminary results from plasma heating experiments are discussed

  9. Towards Optimum Material Choices for HL-LHC Collimator Upgrade

    CERN Document Server

    Quaranta, E.; Biancacci, N.; Bruce, R.; Carra, F.; Métral, E.; Redaelli, S.; Rossi, A.; Salvant, B.

    2016-01-01

    properties that address different limitations of the present collimation system, solutions have been found to fulfil various upgrade challenges. This paper describes the proposed staged approach to deploy new materials in the upgraded HL-LHC collimation system. Beam tests at the CERN HiRadMat facility were also performed to benchmark simulation methods and constitutive material models.

  10. Valorisation de chaleur à bas niveau thermique Upgrading Low-Thermal-Level Heat

    Directory of Open Access Journals (Sweden)

    Cohen G.

    2006-11-01

    Full Text Available La mise en oeuvre à la fois de cycles thermodynamiques et de fluides adaptés permet d'élargir considérablement les possibilités de récupération et de valorisation de la chaleur à bas niveau contenue dans les rejets thermiques industriels, l'eau géothermale, le rayonnement solaire ou le milieu environnant. Ceci permettra une meilleure préservation des ressources énergétiques dans les principaux secteurs consommateurs d'énergie : résidentiel, tertiaire et industriel. On décrit les possibilités que présentent : - Les cycles thermodynamiques directs (pompes de chaleur à compression ou à absorption dans le domaine du chauffage résidentiel et tertiaire où elles sont déjà bien implantées et dont les applications commencent à pénétrer le secteur industriel. - Les cycles thermodynamiques inverses (thermotransformateurs et cycles moteurs à fluide organique pour lesquels les progrès techniques accomplis et l'accroissement du prix de l'énergie devraient permettre d'en assurer la diffusion progressive dans le secteur industriel. The implementation of both thermodynamic cycles and suitable fluids makes for a considerable widening of the capacity to recover and upgrade the low-level heat contained in industrial heat wastes, geothermal water, solar radiation or the surrounding environment. This will make for better conservation of energy resources in the leading sectors of energy consumption, i. e. residential, tertiary and industrial. This article describes these possibilities in the form of: (a Direct thermodynamic cycles (compression or absorption heat pumps in the field of home and tertiary heating where they have already obtained a solid foothold and for which applications are beginning te penetrate into the industrial sector. (b Reverse thermodynamic cycles (heat transformers and organic-fluid motor cycles for which the technical advances made and the increase in energy prices should enable them to spread progressively

  11. THORS: a high-temperature sodium test facility rated at 2.0 MW

    International Nuclear Information System (INIS)

    Gnadt, P.A.; Anderson, A.H.; Clapp, N.E.; Montgomery, B.H.; Collins, C.W.; Stulting, R.D.

    1979-01-01

    The Thermal--Hydraulic Out-of-Reactor Safety (THORS) facility at Oak Ridge Naitonal Laboratory (ORNL) is a high-temperature sodium test facility operated for the United States Breeder Reactor Safety Program. The facility is primarily used for testing large simulated Liquid-Metal Fast Breeder Reactor (LMFBR) fuel subassemblies. The facility has recently been upgraded to provide a 2.0-MW test bundle power input and heat removal capability. A new test section, which will be capable of operating at 980 0 C and which will accommodate a 217-pin bundle, has also been added. A 61-pin bundle is currently under test in the facility. A description of the test facility is presented, along with a brief summary of the 8-year operating history of this safety-related test facility

  12. Treat upgrade fuel fabrication

    International Nuclear Information System (INIS)

    Davidson, K.V.; Schell, D.H.

    1979-01-01

    An extrusion and thermal treatment process was developed to produce graphite fuel rods containing a dispersion of enriched UO 2 . These rods will be used in an upgraded version of the Transient Reactor Test Facility (TREAT). The improved fuel provides a higher graphite matrix density, better fuel dispersion and higher thermal capabilities than the existing fuel

  13. Pulsed power supply for Nova Upgrade

    International Nuclear Information System (INIS)

    Bacon, J.L.; Kajs, J.P.; Walls, A.; Weldon, W.F.; Zowarka, R.C.

    1992-01-01

    This report describes work carried out at the Center for Electromechanics at The University of Texas at Austin (CEM-UT). A baseline design of the Nova Upgrade has been completed by Lawrence Livermore National Laboratory. The Nova Upgrade is an 18 beamline Nd: glass laser design utilizing fully relayed 4x4 30 cm aperture segmented optical components. The laser thus consists of 288 independent beamlets nominally producing 1.5 to 2.0 MJ of 0.35 μm light in a 3 to 5 ns pulse. The laser design is extremely flexible and will allow a wide range of pulses to irradiate ICF targets. This facility will demonstrate ignition/gain and the scientific feasibility of ICF for energy and defense applications. The pulsed power requirements for the Nova Upgrade are given. CEM-UT was contracted to study and develop a design for a homopolar generator/inductor (HPG/inductor) opening switch system which would satisfy the pulsed power supply requirements of the Nova Upgrade. The Nd:glass laser amplifiers used in the Nova Upgrade will be powered by light from xenon flashlamps. The pulsed power supply for the Nova Upgrade powers the xenon flashlamps. This design and study was for a power supply to drive flashlamps

  14. Hydrogen alternatives for a regional upgrader

    International Nuclear Information System (INIS)

    Bailey, R.T.; Padamsey, R.

    1991-01-01

    For a proposed regional upgrader in Alberta, hydrogen will be needed to upgrade the bitumen and heavy oil to be processed by that facility. The upgrader will rely on high conversion hydrocracking which consumes 3.4 wt % hydrogen to produce a 106% volume yield of high quality synthetic crude. The costs of producing hydrogen via steam reforming of methane, partial oxidation of coal or upgrading residues, and electrolysis are compared, showing that steam reforming is the cheapest. However, an even cheaper source of hydrogen is available in the Edmonton and Fort Saskatchewan area as byproducts from petrochemical plants. An economic analysis is presented of a proposed scheme to capture, purify, compress, and transfer hydrogen from one or two such plants to a nearby regional upgrader. The two plants could supply a total of 126.6 million ft 3 /d of hydrogen at a total installed capital cost of about half of that of a steam reforming plant of equivalent size. When operating costs are added (including the cost of replacing the hydrogen, currently used as fuel at the two plants, with natural gas), the total cost of hydrogen is substantially less than the costs for a hydrogen plant within the upgrader. 3 refs., 5 figs., 4 tabs

  15. Advances in boronization on NSTX-Upgrade

    Directory of Open Access Journals (Sweden)

    C. H Skinner

    2017-08-01

    Full Text Available Boronization has been effective in reducing plasma impurities and enabling access to higher density, higher confinement plasmas in many magnetic fusion devices. The National Spherical Torus eXperiment, NSTX, has recently undergone a major upgrade to NSTX-U in order to develop the physics basis for a ST-based Fusion Nuclear Science Facility (FNSF with capability for double the toroidal field, plasma current, and NBI heating power and increased pulse duration from 1–1.5s to 5–8s. A new deuterated tri-methyl boron conditioning system was implemented together with a novel surface analysis diagnostic. We report on the spatial distribution of the boron deposition versus discharge pressure, gas injection and electrode location. The oxygen concentration of the plasma facing surface was measured by in-vacuo XPS and increased both with plasma exposure and with exposure to trace residual gases. This increase correlated with the rise of oxygen emission from the plasma.

  16. ALT-II armor tile design for upgraded TEXTOR operation

    International Nuclear Information System (INIS)

    Newberry, B.L.; McGrath, R.T.; Watson, R.D.

    1994-01-01

    The upgrade of the TEXTOR tokamak at KFA Julich will be completed in the spring of 1994. The upgrade will extend the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating systems are also scheduled to be upgraded so that eventually a total of 8.0 MW auxiliary heating will be available through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles on the full toroidal belt Advanced Limiter Test - II (ALT-II) were designed for 5-second operation with a total heating power of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto ALT-II by more than 300%. Consequently, the graphite armor tiles for ALT-II had to be redesigned in order to increase their thermal inertia and, thereby, avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. The armor tile thermal inertia had been increase primarily by expanding the radial thickness of the tiles from 17 mm to 20 mm. This increase in radial tile dimension will reduce the overall pumping efficiency of the ALT-II pump limiter by about 30%. The final armor tile design was a compromise between increasing the power handling capability and reducing the particle exhaust efficiency of ALT-II. The reduction in exhaust efficiency is unfortunate, but could only be avoided by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time

  17. Prospects for high-power radioactive beam facilities worldwide

    CERN Document Server

    Nolen, Jerry A

    2003-01-01

    Advances in accelerators, targets, ion sources, and experimental instrumentation are making possible ever more powerful facilities for basic and applied research with short-lived radioactive isotopes. There are several current generation facilities, based on a variety of technologies, operating worldwide. These include, for example, those based on the in-flight method such as the recently upgraded National Superconducting Cyclotron Laboratory at Michigan State University, the facility at RIKEN in Japan, GANIL in Caen, France, and GSI in Darmstadt, Germany. Present facilities based on the Isotope-Separator On-Line method include, for example, the ISOLDE laboratory at CERN, HRIBF at Oak Ridge, and the new high-power facility ISAC at TRIUMF in Vancouver. Next-generation facilities include the Radioactive-Ion Factory upgrade of RIKEN to higher energy and intensity and the upgrade of ISAC to a higher energy secondary beam; both of these projects are in progress. A new project, LINAG, to upgrade the capabilities at...

  18. Simulation of the TREAT-Upgrade Automatic Reactor Control System

    International Nuclear Information System (INIS)

    Lipinski, W.C.; Kirsch, L.W.; Valente, A.D.

    1984-01-01

    This paper describes the design of the Automatic Reactor Control System (ARCS) for the Transient Reactor Test Facility (TREAT) Upgrade. A simulation was used to facilitate the ARCS design and to completely test and verify its operation before installation at the TREAT facility

  19. Upgrading of the Budapest reactor

    International Nuclear Information System (INIS)

    Rosta, L.

    1986-10-01

    The increasing importance of neutron sources, high demand for irradiation and experimental facilities as well as improved safety requirements in the 'eighties, necessitate not only a technical modernization of the Reactor but an overall upgrade including instrumentation. Such a reconstruction was decided by the Hungarian governement in 1983

  20. Current Status and Performance Tests of Korea Heat Load Test Facility KoHLT-EB

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sukkwon; Jin, Hyunggon; Shin, Kyuin; Choi, Boguen; Lee, Eohwak; Yoon, Jaesung; Lee, Dongwon [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Kim, Duckhoi; Cho, Seungyon [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    A commissioning test has been scheduled to establish the installation and preliminary performance experiments of the copper hypervapotron mockups. And a qualification test will be performed to evaluate the CuCrZr duct liner in the ITER neutral beam injection facility and the ITER first wall small-scale mockups of the semi-prototype, at up to 1.5 and 5 MW/m{sup 2} high heat flux. Also, this system will be used to test other PFCs for ITER and materials for tokamak reactors. Korean high heat flux test facility(KoHLT-EB; Korea Heat Load Test facility - Electron Beam) by using an electron beam system has been constructed in KAERI to perform the qualification test for ITER blanket FW semi-prototype mockups, hypervapotron cooling devices in fusion devices, and other ITER plasma facing components. The commissioning and performance tests with the supplier of e-gun system have been performed on November 2012. The high heat flux test for hypervapotron cooling device and calorimetry were performed to measure the surface heat flux, the temperature profile and cooling performance. Korean high heat flux test facility for the plasma facing components of nuclear fusion machines will be constructed to evaluate the performance of each component. This facility for the plasma facing materials will be equipped with an electron beam system with a 60 kV acceleration gun.

  1. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron r...

  2. Heat stress and inadequate sanitary facilities at workplaces - an occupational health concern for women?

    Science.gov (United States)

    Venugopal, Vidhya; Rekha, Shanmugam; Manikandan, Krishnamoorthy; Latha, Perumal Kamalakkannan; Vennila, Viswanathan; Ganesan, Nalini; Kumaravel, Perumal; Chinnadurai, Stephen Jeremiah

    2016-01-01

    Health concerns unique to women are growing with the large number of women venturing into different trades that expose them to hot working environments and inadequate sanitation facilities, common in many Indian workplaces. The study was carried out to investigate the health implications of exposures to hot work environments and inadequate sanitation facilities at their workplaces for women workers. A cross-sectional study was conducted with 312 women workers in three occupational sectors in 2014-2015. Quantitative data on heat exposures and physiological heat strain indicators such as core body temperature (CBT), sweat rate (SwR), and urine specific gravity (USG) were collected. A structured questionnaire captured workers perceptions about health impacts of heat stress and inadequate sanitary facilities at the workplace. Workplace heat exposures exceeded the threshold limit value for safe manual work for 71% women (Avg. wet bulb globe temperature=30°C±2.3°C) during the study period. Eighty-seven percent of the 200 women who had inadequate/no toilets at their workplaces reported experiencing genitourinary problems periodically. Above normal CBT, SwR, and USG in about 10% women workers indicated heat strain and moderate dehydration that corroborated well with their perceptions. Observed significant associations between high-heat exposures and SwR (t=-2.3879, p=0.0192), inadequate toilet facilities and self-reported adverse heat-related health symptoms (χ (2)=4.03, p=0.0444), and prevalence of genitourinary issues (χ (2)=42.92, p=0.0005×10(-7)) reemphasize that heat is a risk and lack of sanitation facilities is a major health concern for women workers. The preliminary evidence suggests that health of women workers is at risk due to occupational heat exposures and inadequate sanitation facilities at many Indian workplaces. Intervention through strong labor policies with gender sensitivity is the need of the hour to empower women, avert further health risks, and

  3. Heat loss and fluid leakage tests of the ROSA-III facility

    International Nuclear Information System (INIS)

    Suzuki, Mitsuhiro; Tasaka, Kanji; Shiba, Masayoshi

    1981-12-01

    The report presents characteristic test results about the steady state heat loss, one of the inherent characteristics of the ROSA-III test facility. The steady state heat loss tests were conducted at five different temperature conditions between 111 0 C and 290 0 C . Net heat loss rates were obtained by estimating the electric power supplied to the core, heat input from the recirculation pumps and steam leakage rate. The heat loss characteristics have important contribution to analyses of the ROSA-III small break tests. A following simple relation was obtained between the net heat loss rate Q*sub(HL) (kJ/s) (*: radical) of the ROSA-III facility and the temperature difference ΔT ( 0 C) between the fluid temperature of the system and the room temperature, Q*sub(HL) = 0.56 x ΔT. (*: radical) And the steam leak flow at normal operating condition of the ROSA-III test, (P = 7.2 MPa) was obtained as 8.9 x 10 -3 kg/s and corresponding steam leakage energy as 10.5 kJ/s. The heat input from the recirculation pumps was indirectly estimated under a constant speed by assuming the heat input was equal to the brake horce power of the pumps. (author)

  4. The ATLAS multi-user upgrade and potential applications

    Energy Technology Data Exchange (ETDEWEB)

    Mustapha, B.; Nolen, J. A.; Savard, G.; Ostroumov, P. N.

    2017-12-01

    With the recent integration of the CARIBU-EBIS charge breeder into the ATLAS accelerator system to provide for more pure and efficient charge breeding of radioactive beams, a multi-user upgrade of the ATLAS facility is being proposed to serve multiple users simultaneously. ATLAS was the first superconducting ion linac in the world and is the US DOE low-energy Nuclear Physics National User Facility. The proposed upgrade will take advantage of the continuous-wave nature of ATLAS and the pulsed nature of the EBIS charge breeder in order to simultaneously accelerate two beams with very close mass-to-charge ratios; one stable from the existing ECR ion source and one radioactive from the newly commissioned EBIS charge breeder. In addition to enhancing the nuclear physics program, beam extraction at different points along the linac will open up the opportunity for other potential applications; for instance, material irradiation studies at ~ 1 MeV/u and isotope production at ~ 6 MeV/u or at the full ATLAS energy of ~ 15 MeV/u. The concept and proposed implementation of the ATLAS multi-user upgrade will be presented. Future plans to enhance the flexibility of this upgrade will also be presented.

  5. Thermal System Upgrade of the Space Environment Simulation Test Chamber

    Science.gov (United States)

    Desai, Ashok B.

    1997-01-01

    The paper deals with the refurbishing and upgrade of the thermal system for the existing thermal vacuum test facility, the Space Environment Simulator, at NASA's Goddard Space Flight Center. The chamber is the largest such facility at the center. This upgrade is the third phase of the long range upgrade of the chamber that has been underway for last few years. The first phase dealt with its vacuum system, the second phase involved the GHe subsystem. The paper describes the considerations of design philosophy options for the thermal system; approaches taken and methodology applied, in the evaluation of the remaining "life" in the chamber shrouds and related equipment by conducting special tests and studies; feasibility and extent of automation, using computer interfaces and Programmable Logic Controllers in the control system and finally, matching the old components to the new ones into an integrated, highly reliable and cost effective thermal system for the facility. This is a multi-year project just started and the paper deals mainly with the plans and approaches to implement the project successfully within schedule and costs.

  6. Overview of ASDEX Upgrade results

    NARCIS (Netherlands)

    Stroth, U.; Adamek, J.; Aho-Mantila, L.; Akaslompolo, S.; Amdor, C.; Angioni, C.; Balden, M.; Bardin, S.; L. Barrera Orte,; Behler, K.; Belonohy, E.; Bergmann, A.; Bernert, M.; Bilato, R.; Birkenmeier, G.; Bobkov, V.; Boom, J.; Bottereau, C.; Bottino, A.; Braun, F.; Brezinsek, S.; Brochard, T.; M. Brüdgam,; Buhler, A.; Burckhart, A.; Casson, F. J.; Chankin, A.; Chapman, I.; Clairet, F.; Classen, I.G.J.; Coenen, J. W.; Conway, G. D.; Coster, D. P.; Curran, D.; da Silva, F.; P. de Marné,; D' Inca, R.; Douai, D.; Drube, R.; Dunne, M.; Dux, R.; Eich, T.; Eixenberger, H.; Endstrasser, N.; Engelhardt, K.; Esposito, B.; Fable, E.; Fischer, R.; H. Fünfgelder,; Fuchs, J. C.; K. Gál,; M. García Muñoz,; Geiger, B.; Giannone, L.; T. Görler,; da Graca, S.; Greuner, H.; Gruber, O.; Gude, A.; Guimarais, L.; S. Günter,; Haas, G.; Hakola, A. H.; Hangan, D.; Happel, T.; T. Härtl,; Hauff, T.; Heinemann, B.; Herrmann, A.; Hobirk, J.; H. Höhnle,; M. Hölzl,; Hopf, C.; Houben, A.; Igochine, V.; Ionita, C.; Janzer, A.; Jenko, F.; Kantor, M.; C.-P. Käsemann,; Kallenbach, A.; S. Kálvin,; Kantor, M.; Kappatou, A.; Kardaun, O.; Kasparek, W.; Kaufmann, M.; Kirk, A.; H.-J. Klingshirn,; Kocan, M.; Kocsis, G.; Konz, C.; Koslowski, R.; Krieger, K.; Kubic, M.; Kurki-Suonio, T.; Kurzan, B.; Lackner, K.; Lang, P. T.; Lauber, P.; Laux, M.; Lazaros, A.; Leipold, F.; Leuterer, F.; Lindig, S.; Lisgo, S.; Lohs, A.; Lunt, T.; Maier, H.; Makkonen, T.; Mank, K.; M.-E. Manso,; Maraschek, M.; Mayer, M.; McCarthy, P. J.; McDermott, R.; Mehlmann, F.; Meister, H.; Menchero, L.; Meo, F.; Merkel, P.; Merkel, R.; Mertens, V.; Merz, F.; Mlynek, A.; Monaco, F.; Müller, S.; H.W. Müller,; M. Münich,; Neu, G.; Neu, R.; Neuwirth, D.; Nocente, M.; Nold, B.; Noterdaeme, J. M.; Pautasso, G.; Pereverzev, G.; B. Plöckl,; Podoba, Y.; Pompon, F.; Poli, E.; Polozhiy, K.; Potzel, S.; Puschel, M. J.; Putterich, T.; Rathgeber, S. K.; Raupp, G.; Reich, M.; Reimold, F.; Ribeiro, T.; Riedl, R.; Rohde, V.; van Rooij, G. J.; Roth, J.; Rott, M.; Ryter, F.; Salewski, M.; Santos, J.; Sauter, P.; Scarabosio, A.; Schall, G.; Schmid, K.; Schneider, P. A.; Schneider, W.; Schrittwieser, R.; Schubert, M.; Schweinzer, J.; Scott, B.; Sempf, M.; Sertoli, M.; Siccinio, M.; Sieglin, B.; Sigalov, A.; Silva, A.; Sommer, F.; A. Stäbler,; Stober, J.; Streibl, B.; Strumberger, E.; Sugiyama, K.; Suttrop, W.; Tala, T.; Tardini, G.; Teschke, M.; Tichmann, C.; Told, D.; Treutterer, W.; Tsalas, M.; VanZeeland, M. A.; Varela, P.; Veres, G.; Vicente, J.; Vianello, N.; Vierle, T.; Viezzer, E.; Viola, B.; Vorpahl, C.; Wachowski, M.; Wagner, D.; Wauters, T.; Weller, A.; Wenninger, R.; Wieland, B.; Willensdorfer, M.; Wischmeier, M.; Wolfrum, E.; E. Würsching,; Yu, Q.; Zammuto, I.; Zasche, D.; Zehetbauer, T.; Zhang, Y.; Zilker, M.; Zohm, H.

    2013-01-01

    The medium size divertor tokamak ASDEX Upgrade (major and minor radii 1.65 m and 0.5 m, respectively, magnetic-field strength 2.5 T) possesses flexible shaping and versatile heating and current drive systems. Recently the technical capabilities were extended by increasing the electron cyclotron

  7. Determination of the stochastic layer properties induced by magnetic perturbations via heat pulse experiments at ASDEX upgrade

    Directory of Open Access Journals (Sweden)

    D. Brida

    2017-08-01

    Full Text Available A heat pulse experiment was carried out in the tokamak ASDEX Upgrade to estimate the stochastic layer width of a deuterium L-mode discharge with externally applied Magnetic Perturbations. The method relies on the deposition of ECRH pulses in the plasma edge while measuring the divertor target heat flux with high temporal resolution IR thermography and Langmuir probes. The experimental results were compared to simulations of the time dependent heat pulse propagation on a constant plasma background with the EMC3-EIRENE code package, using an ad-hoc screening model. If no screening was taken into account in the simulations a decrease in the characteristic heat pulse propagation time was observed, which shows that the heat transport is enhanced compared to the screened cases. No such enhancement was found in the experiment, indicating strong screening. In further simulations the effect of screening on the target fluxes was investigated for varying densities. For low densities it was found that screening reduces the strike line splitting strongly, while for higher densities no strong strike line splitting was found, independent of the screening degree. For strongly detached L-mode conditions with MPs experiments at AUG indicate that the lobe structures vanish completely.

  8. Integrated oil production and upgrading using molten alkali metal

    Science.gov (United States)

    Gordon, John Howard

    2016-10-04

    A method that combines the oil retorting process (or other process needed to obtain/extract heavy oil or bitumen) with the process for upgrading these materials using sodium or other alkali metals. Specifically, the shale gas or other gases that are obtained from the retorting/extraction process may be introduced into the upgrading reactor and used to upgrade the oil feedstock. Also, the solid materials obtained from the reactor may be used as a fuel source, thereby providing the heat necessary for the retorting/extraction process. Other forms of integration are also disclosed.

  9. Coupling of AST-500 heating reactors with desalination facilities

    International Nuclear Information System (INIS)

    Kourachenkov, A.V.

    1998-01-01

    The general issues regarding NHR and desalination facility joint operation for potable water production are briefly considered. AST-500 reactor plant and DOU GTPA-type evaporating desalination facilities, both relying on proven technology and solid experience of construction and operation, are taken as a basis for the design of a large-output nuclear desalination complex. Its main design characteristics are given. Similarity of NHR operation for a heating grid and a desalination facility in respect of reactor plant operating conditions and power regulation principles is pointed out. The issues of nuclear desalination complexes composition are discussed briefly as well. (author)

  10. Upgrade of the facility EXOTIC for the in-flight production of light Radioactive Ion Beams

    Energy Technology Data Exchange (ETDEWEB)

    Mazzocco, M., E-mail: marco.mazzocco@pd.infn.it [Dipartimento di Fisica e Astronomia, Universitá di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); INFN-Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); Torresi, D.; Strano, E. [Dipartimento di Fisica e Astronomia, Universitá di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); INFN-Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); Boiano, A. [INFN-Sezione di Napoli, Via Cinthia, I-80126 Napoli (Italy); Boiano, C. [INFN-Sezione di Milano, Via Celoria 16, I-20133 Milano (Italy); Costa, L. [INFN-LNL, Viale dell’Università 2, I-35020 Legnaro, PD (Italy); Glodariu, T. [NIPNE, 407 Atomistilor Street, 077125 Magurele (Romania); Guglielmetti, A. [INFN-Sezione di Milano, Via Celoria 16, I-20133 Milano (Italy); Dipartimento di Fisica,Università di Milano, Via Celoria 16, I-20133 Milano (Italy); La Commara, M. [INFN-Sezione di Napoli, Via Cinthia, I-80126 Napoli (Italy); Dipartimento di Scienze Fisiche, Università di Napoli, Via Cinthia, I-80126 Napoli (Italy); Parascandolo, C. [Dipartimento di Fisica e Astronomia, Universitá di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); INFN-Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); Pierroutsakou, D. [INFN-Sezione di Napoli, Via Cinthia, I-80126 Napoli (Italy); Signorini, C.; Soramel, F. [Dipartimento di Fisica e Astronomia, Universitá di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); INFN-Sezione di Padova, Via F. Marzolo 8, I-35131 Padova (Italy); Stroe, L. [NIPNE, 407 Atomistilor Street, 077125 Magurele (Romania)

    2013-12-15

    Highlights: • Production of in-flight Radioactive Ion Beams via two-body reactions. • Development of a cryogenic gas target. • Event-by-event tracking via Parallel Plate Avalanche Counters (PPACs). -- Abstract: The facility EXOTIC for the in-flight production of light weakly-bound Radioactive Ion Beams (RIBs) has been operating at INFN-LNL since 2004. RIBs are produced via two-body reactions induced by high intensity heavy-ion beams impinging on light gas targets and selected by means of a 30°-dipole bending magnet and a 1-m long Wien filter. The facility has been recently upgraded (i) by developing a cryogenic gas target, (ii) by replacing the power supplies of the middle lenses of the two quadrupole triplets, (iii) by installing two y-steerers and (iv) by placing two Parallel Plate Avalanche Counters upstream the secondary target to provide an event-by-event reconstruction of the position hit on the target. So far, RIBs of {sup 7}Be, {sup 8}B and {sup 17}F in the energy range 3–5 MeV/u have been produced with intensities about 3 × 10{sup 5}, 1.6 × 10{sup 3} and 10{sup 5} pps, respectively. Possible light RIBs (up to Z = 10) deliverable by the facility EXOTIC are also reviewed.

  11. Upgrade of the TCV tokamak, first phase: Neutral beam heating system

    Energy Technology Data Exchange (ETDEWEB)

    Karpushov, Alexander N., E-mail: alexander.karpushov@epfl.ch [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Alberti, Stefano; Chavan, René [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Davydenko, Vladimir I. [Budker Institute of Nuclear Physics SB RAS, 630090 Novosibirsk (Russian Federation); Duval, Basil P. [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Ivanov, Alexander A. [Budker Institute of Nuclear Physics SB RAS, 630090 Novosibirsk (Russian Federation); Fasel, Damien; Fasoli, Ambrogio [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Gorbovsky, Aleksander I. [Budker Institute of Nuclear Physics SB RAS, 630090 Novosibirsk (Russian Federation); Goodman, Timothy [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Kolmogorov, Vyacheslav V. [Budker Institute of Nuclear Physics SB RAS, 630090 Novosibirsk (Russian Federation); Martin, Yves; Sauter, Olivier [Ecole Polytechnique Fédérale de Lausanne (EPFL), Centre de Recherches en Physique des Plasmas, CH-1015 Lausanne (Switzerland); Sorokin, Aleksey V. [Budker Institute of Nuclear Physics SB RAS, 630090 Novosibirsk (Russian Federation); and others

    2015-10-15

    Highlights: • Widening the parameter range of reactor relevant regimes on the TCV tokamak. • Installation of 1 MW, 30 keV neutral beam, direct ion heating, access to T{sub i}/T{sub e} ≥ 1. • ASTRA simulation of plasma response to NB and EC heating in different regimes. • Specific low divergency neutral beam injector with tunable beam power and energy. - Abstract: Experiments on TCV are designed to complement the work at large integrated tokamak facilities (such as JET) to provide a stepwise approach to extrapolation to ITER and DEMO in areas where medium-size tokamaks can often exploit their experimental capabilities and flexibility. Improving the understanding and control requirements of burning plasmas is a major scientific challenge, requiring access to plasma regimes and configurations with high normalized plasma pressure and a wide range of ion to electron temperature ratios, including T{sub e}/T{sub i} ∼ 1. These conditions will be explored by adding a 1 MW neutral heating beam to TCV's auxiliary for direct ion heating (2015) and increasing the ECH power injected in X-mode at the third harmonic (2 MW in 2015–2016). The manufacturing of the neutral beam injector was launched in 2014.

  12. The 12 GeV Upgrade at Jefferson Lab

    International Nuclear Information System (INIS)

    Rolf Ent

    2002-01-01

    There has been a remarkable fruitful evolution of our picture of the behavior of strongly interacting matter during the almost two decades that have passed since the parameters of the Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab were defined. These advances have revealed important new experimental questions best addressed by a CEBAF-class machine at higher energy. Fortunately, favorable technical developments coupled with foresight in the design of the facility make it feasible to triple (double) CEBAF's design (achieved) beam energy from 4 (6) GeV to 12 GeV, in a cost-effective manner: the Upgrade can be realized for about 15% of the cost of the initial facility. This Upgrade would enable the worldwide community to greatly expand its physics horizons. In addition to in general improving the figure of merit and momentum transfer range of the present Jefferson Lab physics program, raising the energy of the accelerator to 12 GeV opens up two main new areas of physics: (1) It allows direct exploration of the quark-gluon structure of hadrons and nuclei in the ''valence quark region''. It is known that inclusive electron scattering at the high momentum and energy transfers available at 12 GeV is governed by elementary interactions with quarks and, indirectly, gluons. The original CEBAF energy is not adequate to study this critical region, while with continuous 12 GeV beams one can cleanly access the entire ''valence quark region'' and exploit the newly discovered Generalized Parton Distributions. In addition, a 12-GeV Jefferson Lab can essentially complete the studies of the transition from hadronic to quark-gluon degrees of freedom. (2) It allows crossing the threshold above which the origins of quark confinement can be investigated. Specifically, 12 GeV will enable the production of certain ''exotic'' mesons. Whereas in the QCD region of asymptotic freedom ample evidence for the role of gluons exist through the observation of gluon jets

  13. Technical developments for an upgrade of the LEBIT Penning trap mass spectrometry facility for rare isotopes

    Science.gov (United States)

    Redshaw, M.; Barquest, B. R.; Bollen, G.; Bustabad, S. E.; Campbell, C. M.; Ferrer, R.; Gehring, A.; Kwiatkowski, A. A.; Lincoln, D. L.; Morrissey, D. J.; Pang, G. K.; Ringle, R.; Schwarz, S.

    2011-07-01

    The LEBIT (Low Energy Beam and Ion Trap) facility is the only Penning trap mass spectrometry (PTMS) facility to utilize rare isotopes produced via fast-beam fragmentation. This technique allows access to practically all elements lighter than uranium, and in particular enables the production of isotopes that are not available or that are difficult to obtain at isotope separation on-line facilities. The preparation of the high-energy rare-isotope beam produced by projectile fragmentation for low-energy PTMS experiments is achieved by gas stopping to slow down and thermalize the fast-beam ions, along with an rf quadrupole cooler and buncher and rf quadrupole ion guides to deliver the beam to the Penning trap. During its first phase of operation LEBIT has been very successful, and new developments are now underway to access rare isotopes even farther from stability, which requires dealing with extremely short lifetimes and low production rates. These developments aim at increasing delivery efficiency, minimizing delivery and measurement time, and maximizing use of available beam time. They include an upgrade to the gas-stopping station, active magnetic field monitoring and stabilization by employing a miniature Penning trap as a magnetometer, the use of stored waveform inverse Fourier transform (SWIFT) to most effectively remove unwanted ions, and charge breeding.

  14. Technical developments for an upgrade of the LEBIT Penning trap mass spectrometry facility for rare isotopes

    International Nuclear Information System (INIS)

    Redshaw, M.; Barquest, B. R.; Bollen, G.; Bustabad, S. E.; Campbell, C. M.; Ferrer, R.; Gehring, A.; Kwiatkowski, A. A.; Lincoln, D. L.; Morrissey, D. J.; Pang, G. K.; Ringle, R.; Schwarz, S.

    2011-01-01

    The LEBIT (Low Energy Beam and Ion Trap) facility is the only Penning trap mass spectrometry (PTMS) facility to utilize rare isotopes produced via fast-beam fragmentation. This technique allows access to practically all elements lighter than uranium, and in particular enables the production of isotopes that are not available or that are difficult to obtain at isotope separation on-line facilities. The preparation of the high-energy rare-isotope beam produced by projectile fragmentation for low-energy PTMS experiments is achieved by gas stopping to slow down and thermalize the fast-beam ions, along with an rf quadrupole cooler and buncher and rf quadrupole ion guides to deliver the beam to the Penning trap. During its first phase of operation LEBIT has been very successful, and new developments are now underway to access rare isotopes even farther from stability, which requires dealing with extremely short lifetimes and low production rates. These developments aim at increasing delivery efficiency, minimizing delivery and measurement time, and maximizing use of available beam time. They include an upgrade to the gas-stopping station, active magnetic field monitoring and stabilization by employing a miniature Penning trap as a magnetometer, the use of stored waveform inverse Fourier transform (SWIFT) to most effectively remove unwanted ions, and charge breeding.

  15. Status of beta measurement evaluation and upgrade program

    International Nuclear Information System (INIS)

    Swinth, K.L.

    1986-01-01

    In 1983, the US Department of Energy (DOE) initiated a program to evaluate and upgrade beta dosimetry capabilities at DOE and DOE-contractor facilities. The program has several elements which structure the development of improvements in beta measurement practices. In addition to Pacific Northwest Laboratory (PNL), universities, private corporations, and other DOE facilities are involved in the research efforts

  16. Qualification test for ITER HCCR-TBS mockups with high heat flux test facility

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk-Kwon, E-mail: skkim93@kaeri.re.kr [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Park, Seong Dae; Jin, Hyung Gon; Lee, Eo Hwak; Yoon, Jae-Sung; Lee, Dong Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Cho, Seungyon [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2016-11-01

    Highlights: • The test mockups for ITER HCCR (Helium Cooled Ceramic Reflector) TBS (Test Blanket System) in Korea were designed and fabricated. • A thermo-hydraulic analysis was performed using a high heat flux test facility by using electron beam. • The plan for qualification tests was developed to evaluate the thermo-hydraulic efficiency in accordance with the requirements of the ITER Organization. - Abstract: The test mockups for ITER HCCR (Helium Cooled Ceramic Reflector) TBS (Test Blanket System) in Korea were designed and fabricated, and an integrity and thermo-hydraulic performance test should be completed under the same or similar operation conditions of ITER. The test plan for a thermo-hydraulic analysis was developed by using a high heat flux test facility, called the Korean heat load test facility by using electron beam (KoHLT-EB). This facility is utilized for a qualification test of the plasma facing component (PFC) for the ITER first wall and DEMO divertor, and for the thermo-hydraulic experiments. In this work, KoHLT-EB will be used for the plan of the performance qualification test of the ITER HCCR-TBS mockups. This qualification tests should be performed to evaluate the thermo-hydraulic efficiency in accordance with the requirements of the ITER Organization (IO), which describe the specifications and qualifications of the heat flux test facility and test procedure for ITER PFC.

  17. National Spherical Torus Experiment (NSTX) Center Stack Upgrade

    International Nuclear Information System (INIS)

    Neumeyer, C.; Avasarala, S.; Chrzanowski, J.; Dudek, L.; Fan, H.; Hatcher, H.; Heitzenroeder, P.; Menard, J.; Ono, M.; Ramakrishnan, S.; Titus, P.; Woolley, R.; Zhan, H.

    2009-01-01

    The purpose of the NSTX Center Stack Upgrade project is to expand the NSTX operational space and thereby the physics basis for next-step ST facilities. The plasma aspect ratio (ratio of plasma major to minor radius) of the upgrade is increased to 1.5 from the original value of 1.26, which increases the cross sectional area of the center stack by a factor of ∼ 3 and makes possible higher levels of performance and pulse duration.

  18. Upgrade of general control system employed for Materials and Life Science Experimental Facility of J-PARC

    International Nuclear Information System (INIS)

    Watanabe, Akihiko; Sakai, Kenji; Ooi, Motoki; Meigo, Shin-ichiro; Takada, Hiroshi

    2013-11-01

    The General Control System (GCS) of the Materials and Life Science Experimental Facility (MLF) of J-PARC controls various devices of a pulsed spallation neutron source and a muon target which are driven by proton beams with energy of 3 GeV and a power of 1 MW, neutron instruments of 23 neutron beam lines and muon instruments of 4 secondary muon beam lines under a network of the control system of accelerators. The current GCS has performed its function as designed since operating MLF was started in 2008. However, it has a weakness that it costs very much in the maintenance because of its poor flexibility on Operating System (OS) and software versions. For example, all computers composed of the GCS must be replaced when the OS is upgraded. For improving the potential flexibility of the GCS in maintenance in view of sustainable long-term operation, therefore, we have re-examined the framework software and those employed for individual functions of GCS under the condition of current functions so as to control all local control panels by plural exclusive PCs, and acquire, store and distribute operation data over 7000 items in the suitable data format. Furthermore, we have made a prototype of an upgraded GCS and evaluated its concrete performances with true data/information such as data transmission speed from PLCs, control functions from operating windows, storage capability of data server and long-term stability/reliability of the system. In conclusion, we decided to adopt following softwares for the upgraded GCS: Experimental Physics and Industrial Control System (EPICS) as framework software, Takebishi-made OPC server as data input/output module, Control System Studio (CSS) as user interface window and PostgreSQL as the data storage server. (author)

  19. Hydrogen assisted biological biogas upgrading

    DEFF Research Database (Denmark)

    Bassani, Ilaria

    Wind and biomass are promoted worldwide as sustainable forms of energy. Anaerobic digestion of biomass produces biogas with ∼50−70% CH4 and 30−50% CO2. However, biogas with >90% CH4 content has higher heating value, can be injected into the natural gas grid or used as alternative to natural gas...... as vehicle fuel. Methods currently available for biogas upgrading mainly consists of physicochemical CO2 removal, requiring the use of chemical substances and energy input and, thus, increasing process costs. This PhD project proposes an alternative to existing biogas upgrading technologies, where H2......, produced by water electrolysis, using excess of electricity from wind mills, is coupled with the CO2 contained in the biogas to convert them to CH4. This process is defined as biological biogas upgrading and is carried out by hydrogenotrophic methanogenic archaea that couples CO2 with H2 to produce...

  20. Coupling of AST-500 heating reactors with desalination facilities

    International Nuclear Information System (INIS)

    Gureyeva, L.V.; Egorov, V.V.; Podberezniy, V.L.

    1997-01-01

    The general issues regarding the joint operation of a NHR and a desalination facility for potable water production are briefly considered. The AST-500 reactor plant and the DOUGTPA-type evaporating desalination facilities, both relying on proven technology and solid experience of construction and operation, are taken as a basis for the design of a large-output nuclear desalination complex. Its main design characteristics are given. The similarity of NHR operation for heating grid and desalination facility in respect of reactor plant operating conditions and power regulation principles is pointed out. The issues of nuclear desalination complexes composition are discussed briefly as well. (author). 2 refs, 1 fig., 1 tab

  1. Coupling of AST-500 heating reactors with desalination facilities

    Energy Technology Data Exchange (ETDEWEB)

    Gureyeva, L V; Egorov, V V [OKBM, Nizhny Novgorod (Russian Federation); Podberezniy, V L [Scientific Research Inst. of Machine Building, Ekaterinburg (Russian Federation)

    1997-09-01

    The general issues regarding the joint operation of a NHR and a desalination facility for potable water production are briefly considered. The AST-500 reactor plant and the DOUGTPA-type evaporating desalination facilities, both relying on proven technology and solid experience of construction and operation, are taken as a basis for the design of a large-output nuclear desalination complex. Its main design characteristics are given. The similarity of NHR operation for heating grid and desalination facility in respect of reactor plant operating conditions and power regulation principles is pointed out. The issues of nuclear desalination complexes composition are discussed briefly as well. (author). 2 refs, 1 fig., 1 tab.

  2. Developments towards the LHCb VELO upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Cid Vidal, Xabier, E-mail: xabier.cid.vidal@cern.ch

    2016-09-21

    The Vertex Locator (VELO) is a silicon strip detector surrounding the interaction region of the LHCb experiment. The upgrade of the VELO is planned to be installed in 2019–2020, and the current detector will be replaced by a hybrid pixel system equipped with electronics capable of reading out at a rate of 40 MHz. The new detector is designed to withstand the radiation dose expected at an integrated luminosity of 50 fb{sup −1}. The detector will be composed of silicon pixel sensors, read out by the VeloPix ASIC that is being developed based on the TimePix/MediPix family. The prototype sensors for the VELO upgrade are being irradiated in five different facilities and the post-irradiation performance is being measured with testbeams, and in the lab. These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign. - Highlights: • The VELO is the detector surrounding the LHCb collision point. • After its upgrade, the VELO will be capable of reading out at a rate of 40 MHz. • The detector will be composed of Si pixel sensors, read out by the VeloPix ASIC. • The irradiated prototype sensors for the VELO upgrade are currently being tested.

  3. NCSX Plasma Heating Methods

    International Nuclear Information System (INIS)

    Kugel, H.W.; Spong, D.; Majeski, R.; Zarnstorff, M.

    2008-01-01

    The National Compact Stellarator Experiment (NCSX) has been designed to accommodate a variety of heating systems, including ohmic heating, neutral beam injection, and radio-frequency (rf). Neutral beams will provide one of the primary heating methods for NCSX. In addition to plasma heating, neutral beams are also expected to provide a means for external control over the level of toroidal plasma rotation velocity and its profile. The experimental plan requires 3 MW of 50-keV balanced neutral beam tangential injection with pulse lengths of 500 ms for initial experiments, to be upgradeable to pulse lengths of 1.5 s. Subsequent upgrades will add 3MW of neutral beam injection (NBI). This paper discusses the NCSX NBI requirements and design issues and shows how these are provided by the candidate PBX-M NBI system. In addition, estimations are given for beam heating efficiencies, scaling of heating efficiency with machine size and magnetic field level, parameter studies of the optimum beam injection tangency radius and toroidal injection location, and loss patterns of beam ions on the vacuum chamber wall to assist placement of wall armor and for minimizing the generation of impurities by the energetic beam ions. Finally, subsequent upgrades could add an additional 6 MW of rf heating by mode conversion ion Bernstein wave (MCIBW) heating, and if desired as possible future upgrades, the design also will accommodate high-harmonic fast-wave and electron cyclotron heating. The initial MCIBW heating technique and the design of the rf system lend themselves to current drive, so if current drive became desirable for any reason, only minor modifications to the heating system described here would be needed. The rf system will also be capable of localized ion heating (bulk or tail), and possibly IBW-generated sheared flows

  4. NCSX Plasma Heating Methods

    International Nuclear Information System (INIS)

    Kugel, H.W.; Spong, D.; Majeski, R.; Zarnstorff, M.

    2003-01-01

    The NCSX (National Compact Stellarator Experiment) has been designed to accommodate a variety of heating systems, including ohmic heating, neutral-beam injection, and radio-frequency. Neutral beams will provide one of the primary heating methods for NCSX. In addition to plasma heating, beams are also expected to provide a means for external control over the level of toroidal plasma rotation velocity and its profile. The plan is to provide 3 MW of 50 keV balanced neutral-beam tangential injection with pulse lengths of 500 msec for initial experiments, and to be upgradeable to pulse lengths of 1.5 sec. Subsequent upgrades will add 3 MW of neutral-beam injection. This Chapter discusses the NCSX neutral-beam injection requirements and design issues, and shows how these are provided by the candidate PBX-M (Princeton Beta Experiment-Modification) neutral-beam injection system. In addition, estimations are given for beam-heating efficiencies, scaling of heating efficiency with machine size an d magnetic field level, parameter studies of the optimum beam-injection tangency radius and toroidal injection location, and loss patterns of beam ions on the vacuum chamber wall to assist placement of wall armor and for minimizing the generation of impurities by the energetic beam ions. Finally, subsequent upgrades could add an additional 6 MW of radio-frequency heating by mode-conversion ion-Bernstein wave (MCIBW) heating, and if desired as possible future upgrades, the design also will accommodate high-harmonic fast-wave and electron-cyclotron heating. The initial MCIBW heating technique and the design of the radio-frequency system lend themselves to current drive, so that if current drive became desirable for any reason only minor modifications to the heating system described here would be needed. The radio-frequency system will also be capable of localized ion heating (bulk or tail), and possibly ion-Bernstein-wave-generated sheared flows

  5. Seismic assessment and upgrading of Paks nuclear power plant

    International Nuclear Information System (INIS)

    Tamas, K.

    2001-01-01

    A comprehensive programme for seismic assessment and upgrading is currently in progress at Hungary's Paks NPP. The re-evaluation of the site seismic hazard had been already completed. The technology of safe shut down and heat removal is established and the systems and structures relevant for seismic safety are identified. A seismic instrumentation is installed. The pre-earthquake preparedness and post-earthquake actions are elaborated. The methods for seismic capacity assessment are selected. The seismic capacity evaluation and the design of upgrading measures are currently in progress. The easy to perform upgrading covering the most urgent measures had been already performed. (author)

  6. Using EPICS enabled industrial hardware for upgrading control systems

    International Nuclear Information System (INIS)

    Bjorkland, Eric A.; Veeramani, Arun; Debelle, Thierry

    2009-01-01

    Los Alamos National Laboratory has been working with National Instruments (NI) and Cosy lab to implement EPICS Input Output Controller (IOC) software that runs directly on NI CompactRIO Real Time Controller (RTC) and communicates with NI LabVIEW through a shared memory interface. In this presentation, we will discuss our current progress in upgrading the control system at the Los Alamos Neutron Science Centre (LANSCE) and what we have learned about integrating CompactRIO into large experimental physics facilities. We will also discuss the implications of using Channel Access Server for LabVIEW which will enable more commercial hardware platforms to be used in upgrading existing facilities or in commissioning new ones.

  7. Recent Upgrades and Extensions of the ASDEX Upgrade ECRH System

    Science.gov (United States)

    Wagner, Dietmar; Stober, Jörg; Leuterer, Fritz; Monaco, Francesco; Münich, Max; Schmid-Lorch, Dominik; Schütz, Harald; Zohm, Hartmut; Thumm, Manfred; Scherer, Theo; Meier, Andreas; Gantenbein, Gerd; Flamm, Jens; Kasparek, Walter; Höhnle, Hendrik; Lechte, Carsten; Litvak, Alexander G.; Denisov, Gregory G.; Chirkov, Alexey; Popov, Leonid G.; Nichiporenko, Vadim O.; Myasnikov, Vadim E.; Tai, Evgeny M.; Solyanova, Elena A.; Malygin, Sergey A.

    2011-03-01

    The multi-frequency Electron Cyclotron Heating (ECRH) system at the ASDEX Upgrade tokamak employs depressed collector gyrotrons, step-tunable in the range 105-140 GHz. The system is equipped with a fast steerable launcher allowing for remote steering of the ECRH RF beam during the plasma discharge. The gyrotrons and the mirrors are fully integrated in the discharge control system. The polarization can be controlled in a feed-forward mode. 3 Sniffer probes for millimeter wave stray radiation detection have been installed.

  8. Heat stress and inadequate sanitary facilities at workplaces – an occupational health concern for women?

    Science.gov (United States)

    Venugopal, Vidhya; Rekha, Shanmugam; Manikandan, Krishnamoorthy; Latha, Perumal Kamalakkannan; Vennila, Viswanathan; Ganesan, Nalini; Kumaravel, Perumal; Chinnadurai, Stephen Jeremiah

    2016-01-01

    Background Health concerns unique to women are growing with the large number of women venturing into different trades that expose them to hot working environments and inadequate sanitation facilities, common in many Indian workplaces. Objective The study was carried out to investigate the health implications of exposures to hot work environments and inadequate sanitation facilities at their workplaces for women workers. Design A cross-sectional study was conducted with 312 women workers in three occupational sectors in 2014–2015. Quantitative data on heat exposures and physiological heat strain indicators such as core body temperature (CBT), sweat rate (SwR), and urine specific gravity (USG) were collected. A structured questionnaire captured workers perceptions about health impacts of heat stress and inadequate sanitary facilities at the workplace. Results Workplace heat exposures exceeded the threshold limit value for safe manual work for 71% women (Avg. wet bulb globe temperature=30°C±2.3°C) during the study period. Eighty-seven percent of the 200 women who had inadequate/no toilets at their workplaces reported experiencing genitourinary problems periodically. Above normal CBT, SwR, and USG in about 10% women workers indicated heat strain and moderate dehydration that corroborated well with their perceptions. Observed significant associations between high-heat exposures and SwR (t=−2.3879, p=0.0192), inadequate toilet facilities and self-reported adverse heat-related health symptoms (χ2=4.03, p=0.0444), and prevalence of genitourinary issues (χ2=42.92, p=0.0005×10−7) reemphasize that heat is a risk and lack of sanitation facilities is a major health concern for women workers. Conclusions The preliminary evidence suggests that health of women workers is at risk due to occupational heat exposures and inadequate sanitation facilities at many Indian workplaces. Intervention through strong labor policies with gender sensitivity is the need of the hour to

  9. Heat stress and inadequate sanitary facilities at workplaces – an occupational health concern for women?

    Directory of Open Access Journals (Sweden)

    Vidhya Venugopal

    2016-09-01

    Full Text Available Background: Health concerns unique to women are growing with the large number of women venturing into different trades that expose them to hot working environments and inadequate sanitation facilities, common in many Indian workplaces. Objective: The study was carried out to investigate the health implications of exposures to hot work environments and inadequate sanitation facilities at their workplaces for women workers. Design: A cross-sectional study was conducted with 312 women workers in three occupational sectors in 2014–2015. Quantitative data on heat exposures and physiological heat strain indicators such as core body temperature (CBT, sweat rate (SwR, and urine specific gravity (USG were collected. A structured questionnaire captured workers perceptions about health impacts of heat stress and inadequate sanitary facilities at the workplace. Results: Workplace heat exposures exceeded the threshold limit value for safe manual work for 71% women (Avg. wet bulb globe temperature=30°C±2.3°C during the study period. Eighty-seven percent of the 200 women who had inadequate/no toilets at their workplaces reported experiencing genitourinary problems periodically. Above normal CBT, SwR, and USG in about 10% women workers indicated heat strain and moderate dehydration that corroborated well with their perceptions. Observed significant associations between high-heat exposures and SwR (t=−2.3879, p=0.0192, inadequate toilet facilities and self-reported adverse heat-related health symptoms (χ2=4.03, p=0.0444, and prevalence of genitourinary issues (χ2=42.92, p=0.0005×10−7 reemphasize that heat is a risk and lack of sanitation facilities is a major health concern for women workers. Conclusions: The preliminary evidence suggests that health of women workers is at risk due to occupational heat exposures and inadequate sanitation facilities at many Indian workplaces. Intervention through strong labor policies with gender sensitivity is the

  10. Advanced conceptual design report: T Plant secondary containment and leak detection upgrades. Project W-259

    International Nuclear Information System (INIS)

    Hookfin, J.D.

    1995-01-01

    The T Plant facilities in the 200-West Area of the Hanford site were constructed in the early 1940s to produce nuclear materials in support of national defense activities. T Plant includes the 271-T facility, the 221-T facility, and several support facilities (eg, 2706-T), utilities, and tanks/piping systems. T Plant has been recommended as the primary interim decontamination facility for the Hanford site. Project W-259 will provide capital upgrades to the T Plant facilities to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. This document provides an advanced conceptual design concept that complies with functional requirements for the T Plant Secondary Containment and Leak Detection upgrades

  11. Overview of ASDEX Upgrade results

    DEFF Research Database (Denmark)

    Zohm, H.; Adamek, J.; Angioni, C.

    2009-01-01

    ASDEX Upgrade was operated with a fully W-covered wall in 2007 and 2008. Stationary H-modes at the ITER target values and improved H-modes with H up to 1.2 were run without any boronization. The boundary conditions set by the full W wall (high enough ELM frequency, high enough central heating and...

  12. Upgraded wood residue fuels 1995

    International Nuclear Information System (INIS)

    Vinterbaeck, J.

    1995-01-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  13. Comparing the steam and electric heat tracing solutions for petrochemical or refining facilities

    Energy Technology Data Exchange (ETDEWEB)

    Young, Joseph G.; McQueen, Greg [Tyco Thermal Controls, Belgie (Belgium)

    2012-07-01

    In this era of energy conservation and cost reduction, the ability to effectively select the optimal solution to meet the heat management system needs of petrochemical or refining facilities is becoming increasingly important. Depending on the type and location of the plant, a heat management system (HMS) can comprise a significant portion of the overall capital expenditure, as well as the ongoing operating and maintenance costs. Several important heat management system design decisions affect the financial operations of a facility, including the selection of the heat tracing technology, the utility distribution scheme, and the insulation system criteria, among others. However, most of these decisions are made early in the project life-cycle without thorough analysis of the various options available. From a high level perspective, numerous heat trace media should be considered, including electric, steam, tempered water, and glycol. These systems also have different impacts on piping systems within the plant battery limits (ISBL) and transfer lines outside of the battery limits (OSBL). This paper takes a careful look at two of the predominant heat tracing technologies - electric heat tracing and steam tracing - and compares these within the larger framework of the heat management system, and relative to petrochemical or refining facilities within the general Brazil geography. In the broader context, a heat management system is defined as the heat tracing technology itself, the utility distribution associated with that technology, the control and monitoring scheme associated with that technology, and the insulation system. We will evaluate the capital expenditure cost, operating expenditure cost, and overall reliability of the electric and steam tracing mediums in both the ISBL and OSBL environments within this broader context. (author)

  14. J-PARC accelerator and neutrino beamline upgrade programme

    Science.gov (United States)

    Friend, M.

    2017-09-01

    The 30 GeV proton beam from the J-PARC Main Ring (MR) accelerator is used to produce a world-class conventional neutrino beam - the neutrino source for the J-PARC long-baseline neutrino programme, including the current T2K experiment and proposed future experiments. Planned upgrades to increase the beam power of the MR from the current ˜400 kW to the design power of 750 kW and beyond, to 1.3+ MW, are underway. These include hardware modifications, such as upgrades of the MR magnet power supplies, RF systems, and feedback systems, as well as a change of the MR beam betatron tune point. Upgrades to the neutrino beamline, such as to the proton beam monitoring, horns, and radioactive material handling, will also be required to accommodate the increased proton beam power. An overview of planned J-PARC MR and neutrino facility upgrades is given.

  15. Upgrade of the LLNL Nova laser for inertial confinement fusion

    International Nuclear Information System (INIS)

    Murray, J.R.; Trenholme, J.B.; Hunt, J.T.; Frank, D.N.; Lowdermilk, W.H.; Storm, E.

    1991-01-01

    The Lawrence Livermore National Laboratory has proposed to construct an upgrade to the Nova glass laser facility to give an output energy of 1.5-2 megajoules at 350 nanometers wavelength in a nominally 3--5 nanosecond shaped pulse. The Nova Upgrade will be suitable for driving inertial fusion targets to ignition. This paper reviews the design proposed for the laser. 14 refs., 10 figs., 1 tab

  16. Status of RNB facilities in North America

    CERN Document Server

    Nolen, J A

    1998-01-01

    This paper presents the status of accelerator facilities in North America that are involved in research using radioactive nuclear beams (RNB), including existing and operating facilities, ones currently under construction or undergoing major upgrades, and ones being planned or proposed for the future. Existing RNB facilities are located at TRIUMF (TISOL) in Vancouver, B.C., the Holifield Radioactive Ion Beam Facility (HRIBF) at Oak Ridge National Laboratory, the Argonne Tandem Linear Accelerator System (ATLAS) at Argonne National Laboratory, the National Superconducting Cyclotron Laboratory (NSCL) at Michigan State University, the Nuclear Structure Laboratory at the University of Notre Dame, the 88" Cyclotron at Lawrence Berkeley National Laboratory, and the Cyclotron Institute at Texas A&M University. Currently, there are two major RNB facility upgrades in progress in North America, one at TRIUMF, the ISAC project, and one at NSCL, the Intensity Upgrade project. For the future, the U.S. Nuclear Science A...

  17. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site`s centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million.

  18. Environmental assessment: Solid waste retrieval complex, enhanced radioactive and mixed waste storage facility, infrastructure upgrades, and central waste support complex, Hanford Site, Richland, Washington

    International Nuclear Information System (INIS)

    1995-09-01

    The U.S. Department of Energy (DOE) needs to take action to: retrieve transuranic (TRU) waste because interim storage waste containers have exceeded their 20-year design life and could fail causing a radioactive release to the environment provide storage capacity for retrieved and newly generated TRU, Greater-than-Category 3 (GTC3), and mixed waste before treatment and/or shipment to the Waste Isolation Pilot Project (WIPP); and upgrade the infrastructure network in the 200 West Area to enhance operational efficiencies and reduce the cost of operating the Solid Waste Operations Complex. This proposed action would initiate the retrieval activities (Retrieval) from Trench 4C-T04 in the 200 West Area including the construction of support facilities necessary to carry out the retrieval operations. In addition, the proposed action includes the construction and operation of a facility (Enhanced Radioactive Mixed Waste Storage Facility) in the 200 West Area to store newly generated and the retrieved waste while it awaits shipment to a final disposal site. Also, Infrastructure Upgrades and a Central Waste Support Complex are necessary to support the Hanford Site's centralized waste management area in the 200 West Area. The proposed action also includes mitigation for the loss of priority shrub-steppe habitat resulting from construction. The estimated total cost of the proposed action is $66 million

  19. Operational upgrades to the DIII-D 60 GHz electron cyclotron resonant heating system

    International Nuclear Information System (INIS)

    Harris, T.E.; Cary, W.P.

    1993-10-01

    One of the primary components of the DIII-D radio frequency (rf) program over the past seven years has been the 60 GHz electron cyclotron resonant heating (ECRH) system. The system now consists of eight units capable of operating and controlling eight Varian VGE-8006 60 GHz, 200 kW gyrotrons along with their associated waveguide components. This paper will discuss the operational upgrades and the overall system performance. Many modifications were instituted to enhance the system operation and performance. Modifications discussed in this paper include an improved gyrotron tube-fault response network, a computer controlled pulse-timing and sequencing system, and an improved high-voltage power supply control interface. The discussion on overall system performance will include operating techniques used to improve system operations and reliability. The techniques discussed apply to system start-up procedures, operating the system in a conditioning mode, and operating the system during DIII-D plasma operations

  20. DIII-D UPGRADE PROJECT FINAL REPORT FOR THE PERIOD OCTOBER 1, 1993 THROUGH MAY 31, 2003

    International Nuclear Information System (INIS)

    STAMBAUGH, RD

    2003-01-01

    OAK-B135 Under DOE Contracts DE-AC03-89ER51114 and DE-AC03-99ER54463 to General Atomics (GA), three ''capital project'' upgrade projects were accomplished on DIII-D from FY93 to FY03 at a total GA cost of $27.2M. These projects included the Fast Wave Current Drive (FWCD) Upgrade ($8.2M), the Radiative Divertor Upgrade ($7.2M) and the Electron Cyclotron Heating (ECH) Upgrade ($11.8M). The ECH and FWCD upgrades provided DIII-D rf and microwave power for electron heating, driving plasma current, controlling the plasma current profile, controlling tearing mode instabilities, and modulated transport studies.The divertor provided adequate density and impurity control for high triangularity single null plasmas in the Advanced Tokamak (AT) Program and information for International Thermonuclear Experimental Reactor (ITER) divertor design. These upgrades provide the power and density control required to initiate the active control of advanced tokamak discharges, which is the key element in the DIII-D program

  1. Design and fabrication of circular and rectangular components for electron-cyclotron-resonant heating of tandem mirror experiment-upgrade

    International Nuclear Information System (INIS)

    Felker, B.; Calderon, M.O.; Chargin, A.K.

    1983-01-01

    The electron-cyclotron-resonant heating (ECRH) systems of rectangular waveguides on Tandem Mirror Experiment-Upgrade (TMX-U) operated with a overall efficiency of 50%, each system using a 28-GHz, 200-kW pulsed gyrotron. We designed and built four circular-waveguide systems with greater efficiency and greater power-handling capabilities to replace the rectangular waveguides. Two of these circular systems, at the 5-kG second-harmonic heating locations, have a total transmission efficiency of >90%. The two systems at the 10-kG fundamental heating locations have a total transmission efficiency of 80%. The difference in efficiency is due to the additional components required to launch the microwaves in the desired orientation and polarization with respect to magnetic-field lines at the 10-kG points. These systems handle the total power available from each gyrotron but do not have the arcing limitation problem of the rectangular waveguide. Each system requires several complex components. The overall physical layout and the design considerations for the rectangular and circular waveguide components are described here

  2. Design and fabrication of circular and rectangular components for electron-cyclotron-resonant heating of tandem mirror experiment-upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Felker, B.; Calderon, M.O.; Chargin, A.K.; Coffield, F.E.; Lang, D.D.; Rubert, R.R.; Pedrotti, L.R.; Stallard, B.W.; Gallagher, N.C. Jr.; Sweeney, D.W.

    1983-11-18

    The electron-cyclotron-resonant heating (ECRH) systems of rectangular waveguides on Tandem Mirror Experiment-Upgrade (TMX-U) operated with a overall efficiency of 50%, each system using a 28-GHz, 200-kW pulsed gyrotron. We designed and built four circular-waveguide systems with greater efficiency and greater power-handling capabilities to replace the rectangular waveguides. Two of these circular systems, at the 5-kG second-harmonic heating locations, have a total transmission efficiency of >90%. The two systems at the 10-kG fundamental heating locations have a total transmission efficiency of 80%. The difference in efficiency is due to the additional components required to launch the microwaves in the desired orientation and polarization with respect to magnetic-field lines at the 10-kG points. These systems handle the total power available from each gyrotron but do not have the arcing limitation problem of the rectangular waveguide. Each system requires several complex components. The overall physical layout and the design considerations for the rectangular and circular waveguide components are described here.

  3. Climate balance of biogas upgrading systems

    International Nuclear Information System (INIS)

    Pertl, A.; Mostbauer, P.; Obersteiner, G.

    2010-01-01

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading) method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO 2 .

  4. Analysis of integrated plant upgrading/life extension programs

    International Nuclear Information System (INIS)

    McCutchan, D.A.; Massie, H.W. Jr.; McFetridge, R.H.

    1988-01-01

    A present-worth generating cost model has been developed and used to evaluate the economic value of integrated plant upgrading life extension project in nuclear power plants. This paper shows that integrated plant upgrading programs can be developed in which a mix of near-term availability, power rating, and heat rate improvements can be obtained in combination with life extension. All significant benefits and costs are evaluated from the viewpoint of the utility, as measured in discounted revenue requirement differentials between alternative plans which are equivalent in system generating capacity. The near-term upgrading benefits are shown to enhance the benefit picture substantially. In some cases the net benefit is positive, even if the actual life extension proves to be less than expected

  5. The Birmingham Irradiation Facility

    International Nuclear Information System (INIS)

    Dervan, P.; French, R.; Hodgson, P.; Marin-Reyes, H.; Wilson, J.

    2013-01-01

    At the end of 2012 the proton irradiation facility at the CERN PS will shut down for two years. With this in mind, we have been developing a new ATLAS scanning facility at the University of Birmingham Medical Physics cyclotron. With proton beams of energy approximately 30 MeV, fluences corresponding to those of the upgraded Large Hadron Collider (HL-LHC) can be reached conveniently. The facility can be used to irradiate silicon sensors, optical components and mechanical structures (e.g. carbon fibre sandwiches) for the LHC upgrade programme. Irradiations of silicon sensors can be carried out in a temperature controlled cold box that can be scanned through the beam. The facility is described in detail along with the first tests carried out with mini (1×1 cm 2 ) silicon sensors

  6. The Birmingham Irradiation Facility

    CERN Document Server

    Dervan, P; Hodgson, P; Marin-Reyes, H; Wilson, J

    2013-01-01

    At the end of 2012 the proton irradiation facility at the CERN PS [1] will shut down for two years. With this in mind, we have been developing a new ATLAS scanning facility at the University of Birmingham Medical Physics cyclotron. With proton beams of energy approximately 30 MeV, fluences corresponding to those of the upgraded Large Hadron Collider (HL-LHC) can be reached conveniently. The facility can be used to irradiate silicon sensors, optical components and mechanical structures (e.g. carbon fibre sandwiches) for the LHC upgrade programme. Irradiations of silicon sensors can be carried out in a temperature controlled cold box that can be scanned through the beam. The facility is described in detail along with the first tests carried out with mini (1 x 1 cm^2 ) silicon sensors.

  7. `Climate wise` program at the Cosmair, Inc. Clark Manufacturing Facility

    Energy Technology Data Exchange (ETDEWEB)

    Kraly, K.

    1997-12-31

    Viewgraphs from the conference presentation are reproduced in this paper, which outlines energy efficiency improvements and emissions reductions at a hair care products manufacturing facility. Program management focuses on employee involvement in internal audits, utility tracking, public relations, and preventative maintenance. Energy savings, cost savings, and emission reductions are presented for 1996 and projected to the year 2000. Other program aspects outlined include a summary of utility costs; solid waste; chilled water system modifications; lighting modifications; boiler upgrades; and heating, ventilating, and air conditioning improvements.

  8. Erosion and migration of tungsten employed at the central column heat shield of ASDEX Upgrade

    International Nuclear Information System (INIS)

    Krieger, K.; Gong, X.; Balden, M.; Hildebrandt, D.; Maier, H.; Rohde, V.; Roth, J.; Schneider, W.

    2002-01-01

    In ASDEX Upgrade, tungsten was employed as plasma facing material at the central column heat shield in the plasma main chamber. The campaign averaged tungsten erosion flux was determined by measuring the difference of the W-layer thickness before and after the experimental campaign using ion beam analysis methods. The observed lateral variation and the total amount of eroded tungsten are attributed to erosion by impact of ions from the scrape-off layer plasma. Migration and redeposition of eroded tungsten were investigated by quantitative analysis of deposited tungsten on collector probes and wall samples. The obtained results, as well as the spectroscopically observed low tungsten plasma penetration probability, indicate that a major fraction of the eroded tungsten migrates predominantly through direct transport channels in the outer plasma scrape-off layer without entering the confined plasma

  9. Authorization basis status report (miscellaneous TWRS facilities, tanks and components)

    Energy Technology Data Exchange (ETDEWEB)

    Stickney, R.G.

    1998-04-29

    This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified.

  10. Authorization basis status report (miscellaneous TWRS facilities, tanks and components)

    International Nuclear Information System (INIS)

    Stickney, R.G.

    1998-01-01

    This report presents the results of a systematic evaluation conducted to identify miscellaneous TWRS facilities, tanks and components with potential needed authorization basis upgrades. It provides the Authorization Basis upgrade plan for those miscellaneous TWRS facilities, tanks and components identified

  11. Holifield Radioactive Ion Beam Facility Development and Status

    CERN Document Server

    Tatum, Alan

    2005-01-01

    The Holifield Radioactive Ion Beam Facility (HRIBF) is a national user facility dedicated to nuclear structure, reactions, and nuclear astrophysics research with radioactive ion beams (RIBs) using the isotope separator on-line (ISOL) technique. An integrated strategic plan for physics, experimental systems, and RIB production facilities have been developed and implementation of the plan is under way. Specific research objectives are defined for studying the nature of nucleonic matter, the origin of elements, solar physics, and synthesis of heavy elements. Experimental systems upgrade plans include new detector arrays and beam lines, and expansion and upgrade of existing devices. A multifaceted facility expansion plan includes a $4.75M High Power Target Laboratory (HPTL), presently under construction, to provide a facility for testing new target materials, target geometries, ion sources, and beam preparation techniques. Additional planned upgrades include a second RIB production system (IRIS2), an external axi...

  12. H-1NF: Australian national fusion plasma research facility

    International Nuclear Information System (INIS)

    Blackwell, B.D.; Borg, G.G.; Dewar, R.L.; Howard, J.; Gardner, H.J.; Rudakov, D.L.; Sharp, L.E.; Shats, M.G.; Warr, G.B.

    1997-01-01

    The H-1 heliac is a helical axis stellarator of moderate size and novel, flexible configuration. Since commissioning, H-1 has operated in quasi-continuous mode at low magnetic field. For higher fields ≤1T an ECRH heating system (28GHz, 200kW) has been installed under a collaborative agreement between ANU and NIFS. H-1 has recently been promoted to national facility status (H-1NF), which will include upgrades of the rf and ech heating systems to megawatt powers, and power supply and diagnostic and data system enhancements. This facilitates collaborative research locally (through the Australian Fusion Research Group consortium) and internationally. Results of a number of basic experiments in quasi-continuous mode are presented. (author)

  13. Automation of heating system with heat pump

    OpenAIRE

    Ferdin, Gašper

    2016-01-01

    Because of high prices of energy, we are upgrading our heating systems with newer, more fuel efficient heating devices. Each new device has its own control system, which operates independently from other devices in a heating system. With a relatively low investment costs in automation, we can group devices in one central control system and increase the energy efficiency of a heating system. In this project, we show how to connect an oil furnace, a sanitary heat pump, solar panels and a heat p...

  14. Design of an Experimental Facility for Passive Heat Removal in Advanced Nuclear Reactors

    Science.gov (United States)

    Bersano, Andrea

    With reference to innovative heat exchangers to be used in passive safety system of Gen- eration IV nuclear reactors and Small Modular Reactors it is necessary to study the natural circulation and the efficiency of heat removal systems. Especially in safety systems, as the decay heat removal system of many reactors, it is increasing the use of passive components in order to improve their availability and reliability during possible accidental scenarios, reducing the need of human intervention. Many of these systems are based on natural circulation, so they require an intense analysis due to the possible instability of the related phenomena. The aim of this thesis work is to build a scaled facility which can reproduce, in a simplified way, the decay heat removal system (DHR2) of the lead-cooled fast reactor ALFRED and, in particular, the bayonet heat exchanger, which transfers heat from lead to water. Given the thermal power to be removed, the natural circulation flow rate and the pressure drops will be studied both experimentally and numerically using the code RELAP5 3D. The first phase of preliminary analysis and project includes: the calculations to design the heat source and heat sink, the choice of materials and components and CAD drawings of the facility. After that, the numerical study is performed using the thermal-hydraulic code RELAP5 3D in order to simulate the behavior of the system. The purpose is to run pretest simulations of the facility to optimize the dimensioning setting the operative parameters (temperature, pressure, etc.) and to chose the most adequate measurement devices. The model of the system is continually developed to better simulate the system studied. High attention is dedicated to the control logic of the system to obtain acceptable results. The initial experimental tests phase consists in cold zero power tests of the facility in order to characterize and to calibrate the pressure drops. In future works the experimental results will be

  15. Data gathering in support of phase O program for waste heat utilization from nuclear enrichment facilities, Ohio

    International Nuclear Information System (INIS)

    1978-01-01

    The gathering of demographic, community development, and economic data for the region impacted by the Pikeville (Ohio) Nuclear Enrichment Facility is described. These data are to be used for establishing possible community uses, e.g., space heating, domestic water heating, and industrial uses, of waste heat from the facility. It was concluded that although the economic feasibility of such waste heat utilization remains to be proven, the community would cooperate in a feasibility demonstration program

  16. Exergoeconomic optimization of an ammonia-water hybrid heat pump for heat supply in a spray drying facility

    DEFF Research Database (Denmark)

    Jensen, Jonas Kjær; Markussen, Wiebke Brix; Reinholdt, Lars

    2014-01-01

    Spray drying facilities are among the most energy intensive industrial processes. Using a heat pump to recover waste heat and replace gas combustion has the potential to attain both economic and emissions savings. In the case examined a drying gas of ambient air is heated to 200 XC. The inlet flow...... rate is 100,000 m3/h which yields a heat load of 6.1 MW. The exhaust air from the drying process is 80 XC. The implementation of an ammonia-water hybrid absorption-compression heat pump to partly cover the heat load is investigated. A thermodynamic analysis is applied to determine optimal circulation...... ratios for a number of ammonia mass fractions and heat pump loads. An exergoeconomic optimization is applied to minimize the lifetime cost of the system. Technological limitations are applied to constrain the solution to commercial components. The best possible implementation is identified in terms...

  17. ALT-II armor tile design for upgraded TEXTOR operation

    International Nuclear Information System (INIS)

    Newberry, B.L.; McGrath, R.T.; Watson, R.D.; Kohlhaas, W.; Finken, K.H.

    1994-01-01

    The upgrade of the TEXTOR tokamak at KFA Juelich was recently completed. This upgrade extended the TEXTOR pulse length from 5 seconds to 10 seconds. The auxiliary heating was increased to a total of 8.0 MW through a combination of neutral beam injection and radio frequency heating. Originally, the inertially cooled armor tiles of the full toroidal belt Advanced Limiter Test -- II (ALT-II) were designed for a 5-second operation with total heating of 6.0 MW. The upgrade of TEXTOR will increase the energy deposited per pulse onto the ALT-II by about 300%. Consequently, the graphite armor tiles for the ALT-II had to be redesigned to avoid excessively high graphite armor surface temperatures that would lead to unacceptable contamination of the plasma. This redesign took the form of two major changes in the ALT-II armor tile geometry. The first design change was an increase of the armor tile thermal mass, primarily by increasing the radial thickness of each tile from 17 mm to 20 mm. This increase in the radial tile dimension reduces the overall pumping efficiency of the ALT-II pump limiter by about 30%. The reduction in exhaust efficiency is unfortunate, but could be avoided only by active cooling of the ALT-II armor tiles. The active cooling option was too complicated and expensive to be considered at this time. The second design change involved redefining the plasma facing surface of each armor tile in order to fully utilize the entire surface area. The incident charged particle heat flux was distributed uniformly over the armor tile surfaces by carefully matching the radial, poloidal and toroidal curvature of each tile to the plasma flow in the TEXTOR boundary layer. This geometry redefinition complicates the manufacturing of the armor tiles, but results in significant thermal performance gains. In addition to these geometry upgrades, several material options were analyzed and evaluated

  18. Low-level liquid radioactive waste treatment at Murmansk, Russia: Technical design and review of facility upgrade and expansion

    International Nuclear Information System (INIS)

    Dyer, R.S.; Diamante, J.M.

    1996-07-01

    The governments of Norway and the US have committed their mutual cooperation and support the Murmansk Shipping Company (MSCo) to expand and upgrade the Low-Level Liquid Radioactive Waste (LLRW) treatment system located at the facilities of the Russian company RTP Atomflot, in Murmansk, Russia. RTP Atomflot provides support services to the Russian icebreaker fleet operated by the MSCo. The objective is to enable Russia to permanently cease disposing of this waste in Arctic waters. The proposed modifications will increase the facility's capacity from 1,200 m 3 per year to 5,000 m 3 per year, will permit the facility to process high-salt wastes from the Russian Navy's Northern fleet, and will improve the stabilization and interim storage of the processed wastes. The three countries set up a cooperative review of the evolving design information, conducted by a joint US and Norwegian technical team from April through December, 1995. To ensure that US and Norwegian funds produce a final facility which will meet the objectives, this report documents the design as described by Atomflot and the Russian business organization, ASPECT, both in design documents and orally. During the detailed review process, many questions were generated, and many design details developed which are outlined here. The design is based on the adsorption of radionuclides on selected inorganic resins, and desalination and concentration using electromembranes. The US/Norwegian technical team reviewed the available information and recommended that the construction commence; they also recommended that a monitoring program for facility performance be instituted

  19. Filtration engineering study to upgrade the ETF

    International Nuclear Information System (INIS)

    McDonald, F.N.N.

    1995-01-01

    Filtration technologies are evaluated which have potential to augment or upgrade the 200 Area Effluent Treatment Facility. The study was written in anticipation of treating future waste waters that have high fouling potentials. The Three ultrafilters judged to be capable of treating future waste waters are: hollow fiber, tubular, and centrifugal

  20. Direct shaft torque measurements in a transient turbine facility

    International Nuclear Information System (INIS)

    Beard, Paul F; Povey, Thomas

    2011-01-01

    This paper describes the development and implementation of a shaft torque measurement system for the Oxford Turbine Research Facility (formerly the Turbine Test Facility (TTF) at QinetiQ, Farnborough), or OTRF. As part of the recent EU TATEF II programme, the facility was upgraded to allow turbine efficiency measurements to be performed. A shaft torque measurement system was developed as part of this upgrade. The system is unique in that, to the authors' knowledge, it provided the first direct measurement of shaft torque in a transient turbine facility although the system has wider applicability to rotating test facilities in which power measurement is a requirement. The adopted approach removes the requirement to quantify bearing friction, which can be difficult to accurately calibrate under representative operating conditions. The OTRF is a short duration (approximately 0.4 s run time) isentropic light-piston facility capable of matching all of the non-dimensional parameters important for aerodynamic and heat studies, namely Mach number, Reynolds number, non-dimensional speed, stage pressure ratio and gas-to-wall temperature ratio. The single-stage MT1 turbine used for this study is a highly loaded unshrouded design, and as such is relevant to modern military, or future civil aero-engine design. Shaft torque was measured directly using a custom-built strain gauge-based torque measurement system in the rotating frame of reference. This paper describes the development of this measurement system. The system was calibrated, including the effects of temperature, to a traceable primary standard using a purpose-built facility. The bias and precision uncertainties of the measured torque were ±0.117% and ±0.183%, respectively. To accurately determine the shaft torque developed by a turbine in the OTRF, small corrections due to inertial torque (associated with changes in the rotational speed) and aerodynamic drag (windage) are required. The methods for performing these

  1. Actuator management for ECRH at ASDEX Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Rapson, Christopher J., E-mail: chris.rapson@ipp.mpg.de; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-10-15

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  2. Actuator management for ECRH at ASDEX Upgrade

    International Nuclear Information System (INIS)

    Rapson, Christopher J.; Reich, Matthias; Stober, Joerg; Treutterer, Wolfgang

    2015-01-01

    Highlights: • Real-time actuator management algorithm developed for ECRH at ASDEX Upgrade. • First use of a control hierarchy in a fusion experiment. • Cost function evaluates optimal combination of all gyrotrons to all possible targets. • Considers many factors e.g. mirror movement, power available, presence and mode number of NTMs. • Configurable, robust algorithm is ready for online testing. - Abstract: Automated actuator management will be necessary on long pulse fusion experiments to adjust to unforeseen plasma events and unpredictable actuator availability. However, as a control problem, actuator management is underdeveloped in the fusion community. This contribution proposes an algorithm based on a control hierarchy and a cost function to optimally allocate scarce actuator resources to various objectives in real-time. Details are given on the development and offline testing which have been completed ready for deployment at ASDEX Upgrade. Electron Cyclotron Resonance Heating (ECRH) is particularly relevant for actuator management due to its localised deposition which can flexibly target specific regions of the plasma for different effects such as non-inductive current drive, impurity regulation, control of MHD modes and of course heating. A further motivation is that automated actuator management will simplify the setup of ECRH, in keeping with the long term goal of integrating MHD control as a routine part of ASDEX Upgrade experiments.

  3. UPGRADES

    CERN Multimedia

    J. Spalding and D. Contardo

    2012-01-01

      The CMS Upgrade Programme consists of four classes of projects: (a) Detector and Systems upgrades which are ongoing and largely (though not entirely) target LS1. (b) Full system upgrades for three projects that are preparing TDRs: Pixels, HCAL and L1 Trigger. The projects target completion by LS2. (c) Infrastructure consolidation and upgrades to improve operational robustness and to support the above projects. (d) Phase 2 replacement of the Tracker and major upgrades of the Trigger and Forward Detectors. For (a) and (c), detailed costing exists and is being integrated into a common reporting system. The schedule milestones for each project will be linked into the overall schedule planning for LS1. For the three TDR projects, the designs have progressed significantly since the Technical Proposal in 2010. Updated detailed cost estimates and schedules will be prepared with the TDRs to form the basis for tracking the projects through completion. To plan the upgrades and the supporting simulati...

  4. A new facility for the determination of critical heat flux in nuclear fuel assemblies

    Energy Technology Data Exchange (ETDEWEB)

    Fortman, R A; Hadaller, G I; Hamilton, R C; Hayes, R C; Shin, K S; Stern, F [Stern Laboratories Inc., Hamilton, ON (Canada)

    1993-11-01

    A facility for the determination of critical heat flux in simulated reactor fuel assemblies has been constructed at Stern Laboratories for CANDU Owners` Group. This paper describes the facility and method of testing. 9 figs.

  5. Experimental investigation of heat transport and divertor loads of fusion plasmas in all metal ASDEX upgrade and JET

    International Nuclear Information System (INIS)

    Sieglin, Bernhard A.

    2014-01-01

    This work presents divertor heat load studies conducted at two of the largest tokamaks currently in operation, ASDEX Upgrade and the Joint European Torus (JET). A commonly agreed empirical scaling for the power fall-off length in H-mode obtained in carbon devices is validated in JET with the ILW. Bohm and Gyro-Bohm like models are identified as possible candidates describing the divertor broadening. Quantities for the assessment of the thermal load induced by transient heat loads are defined. JET with the ILW exhibits an on average longer ELM duration as compared to the carbon wall. For identical pedestal conditions the ELM durations in both cases are found to be the same within error bars. The energy fluency is found to depend mainly on the pedestal pressure with a weak dependence on the relative loss in stored energy. This is noteworthy since the current extrapolation to ITER assumes a linear dependence on the relative ELM size.

  6. NSLS Control Monitor and its upgrade

    International Nuclear Information System (INIS)

    Ramamoorthy, S.; Smith, J.D.

    1993-01-01

    The NSLS Control Monitor is a real-time operating system designed for the microprocessor subsystems that control the machine hardware in the NSLS facility. Its major functions are to control the hardware in response to the commands from the host computers, monitor hardware status and report errors to the alarm handler. The software originally developed for the Multibus micros has been upgraded to run on the VME-based systems. The upgraded monitor provides ethernet communication with the new system and serial link with the old system. The dual link is the key feature for a smooth and nondisruptive transition at all levels of the control system. This paper describes the functions of the various modules of the monitor and future plans

  7. Exergoeconomic optimization of an ammonia–water hybrid absorption–compression heat pump for heat supply in a spraydrying facility

    DEFF Research Database (Denmark)

    Jensen, Jonas Kjær; Markussen, Wiebke Brix; Reinholdt, Lars

    2015-01-01

    Spray-drying facilities are among the most energy intensive industrial processes. Using a heat pump to recover waste heat and replace gas combustion has the potential to attain both economic and emissions savings. In the case examined a drying gas of ambient air is heated to 200 C yielding a heat...... load of 6.1 MW. The exhaust air from the drying process is 80 C. The implementation of anammonia–water hybrid absorption–compression heat pump to partly cover the heat load is investigated. A thermodynamic analysis is applied to determine optimal circulation ratios for a number of ammonia mass...... fractions and heat pump loads. An exergo economic optimization is applied to minimize the lifetime cost of the system. Technological limitations are imposed to constrain the solution to commercial components. The best possible implementation is identified in terms of heat load, ammonia mass fraction...

  8. The upgrade of nuclear material accounting system at KAERI

    International Nuclear Information System (INIS)

    Kim, Hyun Jo; Kim, Hyun Sook; Park, Ho Jun; Ko, Han Suk; Lee, Byung Doo

    2010-01-01

    The agreement between the government of Republic Of Korea (ROK) and the IAEA for the application of safeguards was signed and entered into force in 1975. The Additional Protocol (AP) to the Safeguards Agreement between the ROK and the IAEA was signed in 1999 and entered into force on 19 February 2004. Also, Implementation of Integrated Safeguards (IS) was started on 1 July, 2008 after a draw of the broader conclusion. The IAEA provides 2 hours notification for Random Interim Inspection (RII) under IS. For RII, the facility has to prepare the inspection documents in a short time. Therefore, KAERI (Korea Atomic Energy Research Institute) developed a new computerized nuclear material accounting system named KASIS (KAERI Safeguards Information treatment System) to treat the data by on-line for RII. For the efficient IS implementation, KAERI has a plan to upgrade the system to reflect the accounting approaches or reporting procedure according to facility characteristic. This paper describes the upgrade of the nuclear material accounting system and the efforts to reduce the burden of the facility operators

  9. The Cryogenic Design of the Phase I Upgrade Inner Triplet Magnets for LHC

    CERN Document Server

    van Weelderen, R; Peterson, T

    2011-01-01

    The LHC is operating with beam since end 2009. However, with the present interaction region magnets it cannot reach its nominal performance and a phased approach to upgrading them to reach that nominal performance is taken. The first phase of the LHC interaction region upgrade was approved by Council in December 2007. This phase relies on the mature Nb-Ti superconducting magnet technology with the target of increasing the LHC luminosity to 2 to 3×1034 cm-2s-1, while relying on the existing infrastructure which limits the total heat removal capacity at 1.9 K to 500 W. The Phase I Upgrade LHC interaction region final focus magnets will include four superconducting quadrupoles (low-β triplets) and one superconducting dipole (D1) cooled with pressurized, static superfluid helium (HeII) at 1.9 K. The heat absorbed in pressurized HeII, which may be more than 30 W/m due to dynamic heating from the particle beam halo, will be conducted to saturated He II at about 1.9 K and removed by the low pressure vapour. This p...

  10. Kansas State University accelerator laboratory upgrade

    International Nuclear Information System (INIS)

    Richard, P.

    1989-01-01

    The J.R. Macdonald Laboratory is undergoing a major upgrade of its facilities and capabilities. The laboratory is dedicated to the study of ion-atom collisions using highly charged ions from accelerators and/or ion sources. The mainstay of the laboratory over the last two decades has been a 6 MV tandem accelerator. It has been used to produce one- to a few-MeV/u highly charged ions for studying high energy atomic collisions, and to produce recoil ions from ocllisions with projectile ions for studying low energy atomic collisions. In order to enhance the capabilities of studying atomic collisions in these two energy regimes, we are constructing a superconducting LINAC booster to the tandem, and a stand-alone CRYEBIS source. The project, which is funded by the US Department of Energy, began in May 1985 with a May 1989 completion schedule. The upgrade includes a building addition, funded by the State of Kansas, to house the new facilities. The LINAC consists of a time-superbunching module, followed by three large cryostat modules each containing four superconducting resonators, and followed by an energy-rebunching module. The resonators are the split-ring superconducting Nb type designed and constructed at Argonne National Laboratory, and are presently being tested at KSU. The CRYEBIS source, which consists of a 1 m long 5 T superconducting solenoid with a high degree of straightness, is in the final stages of assembly. We have in operation a new computer network for data acquisition and analysis. A progress report on the status of the upgrade is presented. (orig.)

  11. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    Energy Technology Data Exchange (ETDEWEB)

    Borov, V; Trichkov, V; Alexandrov, A; Jordanov, M [EQE-Bulgaria, Sofia (Bulgaria)

    1995-07-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  12. Design and implementation experience of seismic upgrades at Kozloduy and Paks NPPs

    International Nuclear Information System (INIS)

    Borov, V.; Trichkov, V.; Alexandrov, A.; Jordanov, M.

    1995-01-01

    Series of upgrades have been designed and implemented by EQE-Bulgaria at Kozloduy NPP and as a subcontractor of EQE-International - at Paks NPP. Wide variety of facilities have been upgraded, including Electrical Equipment, Control and Instrumentation Equipment, Technological Equipment, Brick Walls and Building Structures. Different design approaches and concepts have been applied in compliance with the specific technological and structural conditions. The effect of the excitation intensity as well as the presence of specific floor response spectra over the upgrading concept and cost is discussed. Specific problems of supporting heavy technological equipment are noted. A practical approach for seismic upgrading of Brick Walls, as well as a tendency for unification of the engineering design is shown. The first completely upgraded Building Structure at Kozloduy NPP is the structure of the Electrical Control Building to the Diesel Generator of the River-bank Pump Station. Specific problems of the implementation of the final upgrading design of the Diesel Generator Building are outlined. (author)

  13. T Plant secondary containment and leak detection upgrades

    International Nuclear Information System (INIS)

    Carlson, T.A.

    1995-01-01

    The W-259 project will provide upgrades to the 2706-T/TA Facility to comply with Federal and State of Washington environmental regulations for secondary containment and leak detection. The project provides decontamination activities supporting the environmental restoration mission and waste management operations on the Hanford Site

  14. Methods for cost-benefit-risk analysis of material-accounting upgrades

    International Nuclear Information System (INIS)

    Fishbone, L.G.; Gordon, D.M.; Higinbotham, W.; Keisch, B.

    1988-01-01

    The authors have developed a cost-benefit-risk methodology for evaluating material-accounting upgrades at key measurement points in nuclear facilities. The focus of this methodology is on nuclear-material measurements and their effects on inventory differences and shipper/receiver differences. The methodology has three main components: cost, benefits, and risk factors. The fundamental outcome of the methodology is therefore cost-benefit ratios characterizing the proposed upgrades, with the risk factors applied as necessary to the benefits. Examples illustrate the methodology's use

  15. UPGRADES

    CERN Multimedia

    J. Butler and J. Nash

    2011-01-01

    Recent progress on the CMS upgrades was summarised, in a workshop held at Fermilab between 7th and 10th November, attended by more than 150 people, many of whom came from Europe and Asia. Important goals of the workshop were to begin to formulate a schedule for the upgrades and to determine project interdependencies. Input was received from all the upgrade working groups and will be combined into a first-pass schedule over the next several weeks. In addition, technical progress on each of the major subtasks was presented and plans for the near-term future were established. Slides from the more than 100 talks are located at: https://indico.cern.ch/conferenceDisplay.py?confId=153564 In the opening plenary session, Frank Zimmermann, of the CERN Beams Department, gave his view of the LHC luminosity evolution. The luminosity will increase faster than we assumed in designing the upgrades. CMS will need to re-evaluate the current upgrade plans and revise them if necessary. CMS Upgrade Physics coordinator...

  16. Modelling Accumulator Stripper Foil Heating for ESSNUSB Facility

    CERN Document Server

    Martini, Michel

    2015-01-01

    It is proposed to use the 2.0 GeV, 5 MW proton linac, 2.86 ms long pulses at 14 Hz of the European Spallation Source [1], [2] being built in Lund, Sweden to deliver, alternately with the spallation neutron production a very intense neutrino beam to enable the discovery of leptonic CP violation. To this end the linac would be upgraded to supply, in addition to the 2.86 ms long proton pulses at 14 Hz, four 0.72 ms H short pulses at 70 Hz for neutrino production. Because of the high current required in the pulsed neutrino horn, the length of the pulses used for neutrino production will need to be compressed to a few s with the aid of an accumulator ring. Charge exchange injection of an H- beam from the linac will be used, the linac delivering 1.1E15 H- per pulse. This paper is about stripping foil heating considerations, emphasizing the detailed evaluation of the foil temperature over the multiple ring re-fills

  17. The deuterium inventory in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Mayer, M.; Rohde, V.; Ramos, G; Vainonen-Ahlgren, E.; Likonen, J.; Herrmann, A.; Neu, R.

    2007-01-01

    The deuterium inventory in ASDEX Upgrade was determined by quantitative ion beam analysis techniques and SIMS for different discharge campaigns between the years 2002 and 2005. ASDEX Upgrade was a carbon dominated machine during this phase. Full poloidal sections of the lower and upper divertor tile surfaces, limiter tiles, gaps between divertor tiles, gaps between inner heat shield tiles and samples from remote areas below the roof baffle and in pump ducts were analysed, thus offering an exhaustive survey of all relevant areas in ASDEX Upgrade. Deuterium is mainly trapped on plasma-exposed surfaces of inner divertor tiles, where about 70% of the retained deuterium inventory is found. About 20% of the inventory is retained at or below the divertor roof baffle, and about 10% is observed in other areas, such as the outer divertor and in gaps between tiles. The long term deuterium retention is 3-4% of the total deuterium input. The obtained results are compared with gas balance measurements, and conclusions about tritium retention in ITER are made

  18. Performance Test of Korea Heat Load Test Facility (KoHLT-EB) for the Plasma Facing Components of Fusion Reactor

    International Nuclear Information System (INIS)

    Kim, Suk-Kwon; Jin, Hyung Gon; Lee, Eo Hwak; Yoon, Jae-Sung; Lee, Dong Won; Cho, Seungyon

    2014-01-01

    The main components of the plasma facing components (PFCs) in the tokamak are the blanket first wall and divertor, which include the armour materials, the heat sink with the cooling mechanism, and the diagnostics devices for the temperature measurement. The Korea Heat Load Test facility by using electron beam (KoHLT-EB) has been operating for the plasma facing components to develop fusion engineering. This electron beam facility was constructed using a 300 kW electron gun and a cylindrical vacuum chamber. Performance tests were carried out for the calorimetric calibrations with Cu dummy mockup and for the heat load test of large Cu module. For the simulation of the heat load test of each mockup, the preliminary thermal-hydraulic analyses with ANSYS-CFX were performed. For the development of the plasma facing components in the fusion reactors, test mockups were fabricated and tested in the high heat flux test facility. To perform a beam profile test, an assessment of the possibility of electron beam Gaussian power density profile and the results of the absorbed power for that profile before the test starts are needed. To assess the possibility of a Gaussian profile, for the qualification test of the Gaussian heat load profile, a calorimeter mockup and large Cu module were manufactured to simulate real heat. For this high-heat flux test, the Korean high-heat flux test facility using an electron beam system was constructed. In this facility, a cyclic heat flux test will be performed to measure the surface heat flux, surface temperature profile, and cooling capacity

  19. Performance Test of Korea Heat Load Test Facility (KoHLT-EB) for the Plasma Facing Components of Fusion Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Suk-Kwon; Jin, Hyung Gon; Lee, Eo Hwak; Yoon, Jae-Sung; Lee, Dong Won [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Cho, Seungyon [National Fusion Research Institute, Daejeon (Korea, Republic of)

    2014-10-15

    The main components of the plasma facing components (PFCs) in the tokamak are the blanket first wall and divertor, which include the armour materials, the heat sink with the cooling mechanism, and the diagnostics devices for the temperature measurement. The Korea Heat Load Test facility by using electron beam (KoHLT-EB) has been operating for the plasma facing components to develop fusion engineering. This electron beam facility was constructed using a 300 kW electron gun and a cylindrical vacuum chamber. Performance tests were carried out for the calorimetric calibrations with Cu dummy mockup and for the heat load test of large Cu module. For the simulation of the heat load test of each mockup, the preliminary thermal-hydraulic analyses with ANSYS-CFX were performed. For the development of the plasma facing components in the fusion reactors, test mockups were fabricated and tested in the high heat flux test facility. To perform a beam profile test, an assessment of the possibility of electron beam Gaussian power density profile and the results of the absorbed power for that profile before the test starts are needed. To assess the possibility of a Gaussian profile, for the qualification test of the Gaussian heat load profile, a calorimeter mockup and large Cu module were manufactured to simulate real heat. For this high-heat flux test, the Korean high-heat flux test facility using an electron beam system was constructed. In this facility, a cyclic heat flux test will be performed to measure the surface heat flux, surface temperature profile, and cooling capacity.

  20. Experimental investigation on an innovative resorption system for energy storage and upgrade

    International Nuclear Information System (INIS)

    Jiang, Long; Wang, Liwei; Wang, Ruzhu; Zhu, Fangqi; Lu, Yiji; Roskilly, Anthony Paul

    2017-01-01

    Highlights: • A resorption thermal energy storage system is established and investigated for energy upgrade. • The highest heat release temperature is 155 °C. • The maximum thermal storage density is about 662 kJ/kg. • The energy efficiency and exergy efficiency range from 27.5% to 40.6% and from 32.5% to 47%. • ENG-TSA as the additive improves the heat and mass performance of composite adsorbent. - Abstract: Progress of efficient thermal energy storage (TES) has become a key technology for the development of energy conversion system. Among TES technologies, sorption thermal energy storage (STES) has drawn burgeoning attentions due to its advantages of high energy density, little heat loss and flexible working modes. Based on STES, this paper presents an innovative resorption sorption energy storage (RTES), and the experimental system is established and investigated for energy storage and upgrade. 4.8 kg and 3.9 kg MnCl 2 and CaCl 2 composite sorbents are separately filled in the sorption reactor, and expanded natural graphite treated with sulfuric acid (ENG-TSA) is integrated as the matrix for heat transfer intensification. It is indicated that the highest energy storage density are 662 kJ/kg and 596 kJ/kg when heat input temperature is 125 °C and heat release temperature are 130 °C and 135 °C, respectively. For different heat input and release temperature, the energy efficiency and exergy efficiency range from 27.5% to 40.6% and from 32.5% to 47%, respectively. The novel RTES system verifies the feasibility for energy storage and upgrade, which shows the great potential for low grade heat utilization especially for industrial process.

  1. Development of BNL Heat Transfer Facility 1: flashing experiments

    International Nuclear Information System (INIS)

    Leonhardt, W.J.; Klein, J.H.; Zimmer, G.A.; Abuaf, N.; Jones, O.C. Jr.

    1979-01-01

    A major area of interest to reactor safety technology is the prediction of actual vapor generation rates under conditions of thermal nonequilibrium as would be encountered during a loss-of-coolant accident (LOCA) in a light water reactor. In support of the development of advanced codes dealing with LOCA induced flashing, analytical models of the nonequilibrium vapor generation processes of interest have been formulated, and an experimental facility has been constructed to provide data to verify these models. This facility is known as BNL Heat Transfer Facility. The experimental facility consists of a flow loop, test section and the data acquisition and analysis system. The main portion of the flow loop is constructed from three inch nominal (7.6 cm) stainless steel pipe. High purity water is circulated through the loop using a centrifugal pump rated 1500 l/min at 600 kPa. Very close and stable control of all loop parameters is required since flashing is sensitive to very small changes in such parameters as flow rate, subcooling, and pressure

  2. Upgrading nuclear safeguards in Kazakhstan

    International Nuclear Information System (INIS)

    Hunt, Maribeth; Murakami, Kenji

    2005-01-01

    When the Soviet Union collapsed in December 1991, Kazakhstan inherited 1,410 nuclear warheads. Within three years, by 1994, Kazakhstan had formally acceded to the Nuclear Non-Proliferation Treaty (NPT) and transferred its last nuclear warhead to Russia in April 1995. Its NPT safeguards agreement with the IAEA came into force in 1994 and all facilities are under safeguards. In February 2004 Kazakhstan signed the Additional Protocol to its IAEA safeguards agreement, though this not yet in force. Kazakhstan played a key role during the Soviet era as a supplier and processor of uranium. The BN-350 fast reactor at Aktau (formerly Shevchenko), on the shore of the Caspian Sea, successfully produced up to 135 MWe of electricity and 80,000 m3/day of potable water over some 27 years until it was closed down in mid-1999. The IAEA being involved in upgrading the nuclear material accountancy and control systems of all Member States requested, Japan and Sweden to conduct independent evaluations at the Kazakhstan Atomic Energy Committee (KAEC), and specifically at the Ulba Metallurgical Plant (UMP) and identified areas that could be improved with respect to nuclear material accountancy and control. In June 2003 the Agency, with four Member States and the European Union, undertook a programme to upgrade the nuclear accountancy and control systems within Kazakhstan with special emphasis on the UMP in Ust-Kamenogorsk in northeast Kazakhstan. The current IAEA programme is focused on upgrading hardware and software systems and the training of personnel in Kazakhstan. Due to the complexity of the facility, special emphasis is on training personnel and upgrading systems at the UMP. At the UMP the focus is on reducing the uncertainty in the hold-up (material which cannot be cleaned out) in the process lines, better determining the amount of nuclear material that is released from the facility as waste or retained at the facility as waste, increasing the ability of the facility to more

  3. The enhanced pellet centrifuge launcher at ASDEX Upgrade: Advanced operation and application as technology test facility for ITER and DEMO

    Energy Technology Data Exchange (ETDEWEB)

    Ploeckl, B., E-mail: bernhard.ploeckl@ipp.mpg.de [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Day, Chr. [Karlsruhe Institute of Technology (KIT), 76021 Karlsruhe (Germany); Lamalle, Ph. [ITER Organization, Route de Vinon sur Verdon, CS 90046, 13067 Saint-Paul-lez-Durance (France); Lang, P.T.; Rohde, V.; Viezzer, E. [Max Planck Institute for Plasma Physics, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2015-10-15

    The pellet centrifuge at ASDEX Upgrade has served for more than 20 years as a powerful tool for plasma control. Its recently enhanced control system provides more thorough control over parameters and a detailed view of all measured values. A study has recently been initiated on the conceptual design of an optimized DEMO core particle fuelling system. For this approach, first technical tests aimed on an optimized pellet transfer with respect to the preparation of the solid fuel and the transfer systems have been performed. An investigation of the temperature dependence of transfer efficiency (mass loss due to erosion and broken pellets) has revealed a weak dependence. For ITER, in which it is intended to operate a heating scheme with ICRF minority heating of He-3, test injections are performed using D{sub 2}-pellets as carriers for He-4. Admixing of N{sub 2} was investigated as well.

  4. Project description: ORNL PWR blowdown heat transfer separate-effects program, Thermal-Hydraulic Test Facility (THTF)

    International Nuclear Information System (INIS)

    1976-02-01

    The ORNL Pressurized-Water Reactor Blowdown Heat Transfer (PWR-BDHT) Program is an experimental separate-effects study of the relations among the principal variables that can alter the rate of blowdown, the presence of flow reversal and rereversal, time delay to critical heat flux, the rate at which dryout progresses, and similar time-related functions that are important to LOCA analysis. Primary test results will be obtained from the Thermal-Hydraulic Test Facility (THTF), a large nonnuclear pressurized-water loop that incorporates a 49-rod electrically heated bundle. Supporting experiments will be carried out in two additional test loops - the Forced Convection Test Facility (FCTF), a small high-pressure facility in which single heater rods can be tested in annular geometry; and an air-water loop which is used to evaluate two-phase flow-measuring instrumentation

  5. TMX-U [Tandem Mirror Experiment-Upgrade]: Final report, Volume 2

    International Nuclear Information System (INIS)

    Porter, G.D.

    1988-01-01

    This paper discusses the plasma control and the physics accomplishments of the Tandem Mirror Experiment-Upgrade. This particular volume discusses fueling, ion heating, Fokker-Planck modeling, plasma stability and technical development. 270 refs

  6. Evaluation of Energy Efficient Options to Heat Ohio Department of Transportation (ODOT) Maintenance Facilities

    Science.gov (United States)

    2018-01-01

    This project was initiated by the ODOT District 2 staff who were looking for more efficient ways to heat and operate their maintenance facilities. This especially applied to the idea of using radiant floor heating as an alternative to todays stand...

  7. VISIR upgrade overview and status

    Science.gov (United States)

    Kerber, Florian; Käufl, Hans Ulrich; Baksai, Pedro; Dobrzycka, Danuta; Finger, Gert; Ives, Derek; Jakob, Gerd; Lagadec, Eric; Lundin, Lars; Mawet, Dimitri; Mehrgan, Leander; Moerchen, Margaret; Momany, Yazan; Moreau, Vincent; Pantin, Eric; Riquelme, Miguel; Siebenmorgen, Ralf; Silber, Armin; Smette, Alain; Taylor, Julian; van den Ancker, Mario; Venema, Lars; Weilenmann, Ueli; Yegorova, Irina

    2012-09-01

    We present an overview of the VISIR upgrade project. VISIR is the mid-infrared imager and spectrograph at ESO's VLT. The project team is comprised of ESO staff and members of the original VISIR consortium: CEA Saclay and ASTRON. The project plan is based on input from the ESO user community with the goal of enhancing the scientific performance and efficiency of VISIR by a combination of measures: installation of improved hardware, optimization of instrument operations and software support. The cornerstone of the upgrade is the 1k by 1k Si:As Aquarius detector array (Raytheon) which has demonstrated very good performance (sensitivity, stability) in the laboratory IR detector test facility (modified TIMMI 2 instrument). A prism spectroscopic mode will cover the N-band in a single observation. New scientific capabilities for high resolution and high-contrast imaging will be offered by sub-aperture mask (SAM) and phase-mask coronagraphic (4QPM/AGPM) modes. In order to make optimal use of favourable atmospheric conditions a water vapour monitor has been deployed on Paranal, allowing for real-time decisions and the introduction of a userdefined constraint on water vapour. Improved pipelines based on the ESO Reflex concept will provide better support to astronomers. The upgraded VISIR will be a powerful instrument providing background limited performance for diffraction-limited observations at an 8-m telescope. It will offer synergy with facilities such as ALMA, JWST, VLTI and SOFIA, while a wealth of targets is available from survey work (e.g. VISTA, WISE). In addition it will bring confirmation of the technical readiness and scientific value of several aspects of potential mid-IR instrumentation at Extremely Large Telescopes. The intervention on VISIR and installation of hardware has been completed in July and commissioning will take place during July and August. VISIR is scheduled to be available to the users starting Oct 2012.

  8. The status of the LAMPF control system upgrade

    International Nuclear Information System (INIS)

    Carr, G.P.; Schaller, S.C.; Bjorklund, E.A.; Burns, M.J.; Harrison, J.F.; Rose, P.A.; Schultz, D.E.

    1987-01-01

    The upgraded Los Alamos Meson Physics Facility (LAMPF) control system is now operational. The SEL-840 computer has been removed, and all application programs are now running on VAXes. We are continuing to upgrade the control system network. We are using MicroVMS systems for distributed local control and have introduced VAXELN systems for dedicated real-time situations. Communications with both systems is based on a standardized remote procedure call interface. We have also begun to integrate the Proton Storage Ring controls with the LAMPF control system, to experiment with VAX/GPX-based workstation operator interfaces, and to investigate possible applications of artificial intelligence technology. 13 refs

  9. Texas Experimental Tokamak: A plasma research facility. Technical progress report, November 1, 1993--October 31, 1994

    Energy Technology Data Exchange (ETDEWEB)

    Wootton, A.J.

    1994-07-01

    The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics in order to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks and in particular to understand the role of turbulence. So that they can continue to study the physics that is most relevant to the fusion program, TEXT completed a significant device upgrade this year. The new capabilities of the device and new and innovative diagnostics were exploited in all main program areas including: (1) configuration studies; (2) electron cyclotron heating physics; (3) improved confinement modes; (4) edge physics/impurity studies; (5) central turbulence and transport; and (6) transient transport. Details of the progress in each of the research areas are described.

  10. Texas Experimental Tokamak: A plasma research facility. Technical progress report, November 1, 1993--October 31, 1994

    International Nuclear Information System (INIS)

    Wootton, A.J.

    1994-07-01

    The purpose is to operate and maintain TEXT Upgrade as a complete facility for applied tokamak physics in order to elucidate the mechanisms of working gas, impurity, and thermal transport in tokamaks and in particular to understand the role of turbulence. So that they can continue to study the physics that is most relevant to the fusion program, TEXT completed a significant device upgrade this year. The new capabilities of the device and new and innovative diagnostics were exploited in all main program areas including: (1) configuration studies; (2) electron cyclotron heating physics; (3) improved confinement modes; (4) edge physics/impurity studies; (5) central turbulence and transport; and (6) transient transport. Details of the progress in each of the research areas are described

  11. A comparison of advanced thermal cycles suitable for upgrading existing power plant

    International Nuclear Information System (INIS)

    Heyen, G.; Kalitventzeff, B.

    1999-01-01

    In view of the constant growth of electricity usage and public pressure to reduce the dependence on nuclear power plants in the energy supply, solutions are sought to increase the capacity of power plants using fossil fuels. Highly efficient cycles are available: gas turbines combined with waste heat boilers and steam cycles are able to achieve efficiencies above 50-55%. However building new plants requires a large amount of capital.Alternative proposals are based on upgrades of existing plants : capital savings are expected by reusing part of the facilities. In the present study, three parallel proposals are compared on the basis of exergy efficiency; cost of investment and flexibility of operation are also discussed. They are compared with classical Rankine cycle and state of the art combined cycles. (Copyright (c) 1999 Elsevier Science B.V., Amsterdam. All rights reserved.)

  12. Interactive learning for upgrading and growth: Case of Indonesian fishery firms

    Directory of Open Access Journals (Sweden)

    Erman Aminullah

    2017-07-01

    Full Text Available This paper intends to reveal the interactive learning for upgrading and growth in Indonesian fishery firms. The main question is how learning and innovation have occurred in Indonesian fishery firms. The study was conducted in two categories of fishery firms: fish processing and aquaculture (shrimp. The interfirm interactions contain knowledge flows and feedback in local production network involving local suppliers and foreign buyers. The study found that the model of interactive learning for upgrading and growth work as a coupling of three loops: the upgrading capability, the growth formation, and limiting elements. The upgrading capability is subject to growth formation, which is determined by limiting elements.  The limiting elements will control the quantity and quality of materials supply that affect inter-firm interaction. The model suggests that the dynamics of upgrading and growth through interactive leraning will continue in a stable manner by easing the constraints of limiting elements through: combating illegal fishing, encouraging interaction with universities, shifting to higher added value products, institutional support for global trading,  preventing shrimp disease, providing infrastructure, business facilities, and regulation information.   Key words: upgrading, growth, limiting elements, knowledge flows, production network, global market.

  13. High resolution upgrade of the ATF damping ring BPM system

    International Nuclear Information System (INIS)

    Terunuma, N.; Urakawa, J.; Frisch, J.; May, J.; McCormick, D.; Nelson, J.; Seryi, A.; Smith, T.; Woodley, M.; Briegel, C.; Dysert, R.

    2008-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished in its first stage, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital downconversion techniques, digital signal processing, and also tests a new automatic gain error correction schema. The technical concept and realization, as well as preliminary results of beam studies are presented

  14. Approach of seismic upgrading in Kashiwazaki-Kariwa Nuclear Power Plant

    International Nuclear Information System (INIS)

    Sato, Hitoshi

    2009-01-01

    Because guide for reviewing seismic design of nuclear power reactor facilities was reworked in 2006, we formulated new Design Base Seismic Motion Ss, and we are doing evaluation of seismic safety (back-check). In Japan, depending on aseismatic importance, equipments are classified into S-class, B-class and C-class. For S-class equipments, we evaluate it on the basis of new Ss, and do seismic upgrading. For B-class and C-class equipments, we do seismic upgrading voluntarily on the basis of the experiences of the Niigataken Chuetsu-Oki (NCO) Earthquake. (author)

  15. Energy and particle control characteristics of the ASDEX Upgrade 'LYRA' divertor

    International Nuclear Information System (INIS)

    Kaufmann, M.; Bosch, H.S.; Herrmann, A.

    1999-01-01

    In 1997 the new 'LYRA' divertor went into operation at ASDEX Upgrade and the neutral beam heating power was increased to 20 MW by installation of a second injector. This leads to the relatively high value of P/R of 12 MW/m. It has been shown that the ASDEX Upgrade LYRA divertor is capable of handling such high heating powers. Measurements presented in this paper reveal a reduction of the maximum heat flux in the LYRA divertor by more than a factor of two compared to the open Divertor I. This reduction is caused by radiative losses inside the divertor region. Carbon radiation cools the divertor plasma down to a few eV where hydrogen radiation losses become significant. They are increased due to an effective reflection of neutrals into the hot separatrix region. B2-Eirene modelling of the performed experiments supports the experimental findings and refines the understanding of loss processes in the divertor region. (author)

  16. Energy and particle control characteristics of the ASDEX Upgrade 'LYRA' divertor

    International Nuclear Information System (INIS)

    Kaufmann, M.; Bosch, H.-S.; Herrmann, A.

    2001-01-01

    In 1997 the new 'LYRA' divertor went into operation at ASDEX Upgrade and the neutral beam heating power was increased to 20 MW by installation of a second injector. This leads to the relatively high value of P/R of 12 MW/m. It has been shown that the ASDEX Upgrade LYRA divertor is capable of handling such high heating powers. Measurements presented in this paper reveal a reduction of the maximum heat flux in the LYRA divertor by more than a factor of two compared to the open Divertor I. This reduction is caused by radiative losses inside the divertor region. Carbon radiation cools the divertor plasma down to a few eV where hydrogen radiation losses become significant. They are increased due to an effective reflection of neutrals into the hot separatrix region. B2-Eirene modelling of the performed experiments supports the experimental findings and refines the understanding of loss processes in the divertor region. (and others)

  17. Diagnostics upgrade and capability available for physics study on EAST tokamak

    International Nuclear Information System (INIS)

    Hu Liqun

    2013-01-01

    As a consequence of employment of many new techniques and upgrade of EAST superconducting tokamak to enhance divertor plasma performance, significant achievement has been realized in 2012, including 400s long pulse plasma, stationary 35s H-mode and 3.45s H-mode with only ion cyclotron resonant heating (ICRH) etc. To approach steady-state (SS) operation of high-performance plasmas and address key physics on fusion reactor-relevent subjects, recently, capability of the plasma heating and current drive of EAST machine are doubled with total auxiliary injection power over 20 MW, including new methodology of neutral beam injection (NBI) and electron cyclotron resonant heating (ECRH). Most diagnostics have been upgraded to be more compact and integrated due to limited port window and space available, and new advanced neutral-beam related diagnostics have been developed as well, to provide profile of all key parameters for study and understanding critical issues specific to SS high performance plasma. (author)

  18. LHC IR Upgrade Nb-Ti, 120mm Aperture Model Quadrupole Test Results at 1.8K

    CERN Document Server

    Kirby, G A; Bajko, M; Datskov, V I; Durante, M; Fessia, P; Feuvrier, J; Guinchard, M; Giloux, C; Granieri, P P; Manil, P; Perez, J C; Ravaioli, E; Rifflet, J M; Russenschuck, S; Sahner, T; Segreti, M; Todesco, E; Willering, G

    2014-01-01

    Over the last five years, the model MQXC quadruple, a 120 mm aperture, 120 T/m, 1.8 m long, Nb-Ti version of the LHC insertion upgrade (due in 2021), has been developed at CERN. The magnet incorporates several novel concepts to extract high levels of heat flux and provide high quality field harmonics throughout the full operating current range. Existing LHC-dipole cable with new, open cable and ground insulation was used. Two, nominally identical 1.8 m long magnets were built and tested at 1.8 K at the CERN SM18 test facility. This paper compares in detail the two magnet tests and presents: quench performance, internal stresses, heat extraction simulating radiation loading in the superconducting coils, and quench protection measurements. The first set of tests highlighted the conflict between high magnet cooling capability and quench protection. The second magnet had additional instrumentation to investigate further this phenomenon. Finally we present test results from a new type of superconducting magnet pro...

  19. Experimental study of heat transfer in the slotted channels at CTF facility

    International Nuclear Information System (INIS)

    Asmolov, V.; Kobzar, L.; Nickulshin, V.; Strizhov, V.

    1999-01-01

    During core melt accident significant amount of core may relocate in the reactor pressure vessel lower head. During its cooling it may form cracks inside the corium and gap between corium and reactor vessel. Gap also may appear due to deformation of the lower head if its temperature exceed creep limit. Slotted channels ensure ingress of the cooling water into the corium, and exit of the generated steam. Study of the cool-down mechanism of the solid core debris in the lower head of the reactor vessel through gap and cracks is the objective of experimental work on the CTF facility. Thermal hydraulics in the heated channels closed from the bottom and flooded with the saturated water from the top of the channel, is characterized by the counterflow of the steam and water, attended by such specific phenomena as the dry out when boiling, flooding and overturning of the coming down flow of water at the certain flow rates of the steam going up, partial dry out of the channel, and reflooding from the top of the heated channel with the saturated water. The above phenomena may reveal independently or in different combinations depending on geometric parameters of the channel, heat release, and coolant parameters. Interchange of these processes with a certain cyclic sequence is possible. Experimental study was performed at the CTF (Coolability Test Facility) facility, which is a part of the thermohydraulic KC test facility in the RRC 'Kurchatov Institute'. Presented results are obtained at the CTF-1 test section which represents a vertical flat channel modeling a single crack in the solidified corium or the gap between the corium and reactor vessel

  20. Thermal hydraulic phenomenology for the heating process in a natural circulation facility

    International Nuclear Information System (INIS)

    Torres, Walmir M.; Macedo, Luiz A.; Mesquita, Roberto N.; Masotti, Paulo Henrique F.; Libardi, Rosani Maria P.; Sabundjian, Gaiane; Andrade, Delvonei A.; Umbehaun, Pedro Ernesto; Conti, Thadeu N.; Silva Filho, Mauro F.S.; Melo, Gabriel R.

    2009-01-01

    This work describes thermal hydraulic phenomenology observed for the heating process in a natural circulation facility. Glass made circuit allows observations of the thermal hydraulic processes over several regions. Natural convection, natural circulation, nucleated sub-cooled, saturated boiling and some flow patterns such as, bubbly, slug and churn flow are observed and described. Facility heated and cooled parts are responsible for the natural circulation when in operation. An expansion tank accommodates the fluid density variations due to the temperature changes and void fraction. Instrumentation consists of thermocouples distributed along the circuit. Two differential pressure transducers are used for pressure and level measurements. Instrumentation signals and images are simultaneously acquired to help with phenomenon description. A CCD digital camera at a 250μs shutter speed is used for the images acquisition. Phenomenology described is based on a test under 1.1 x 10 5 W/m 2 of heat flux which corresponds to an electrical heater power of 7000 W and 0.0236 kg/s (85 l/h) of cooling flow rate. (author)

  1. Limiter and divertor systems - conceptual and mechanical design for Aditya Tokamak upgrade

    International Nuclear Information System (INIS)

    Patel, Kaushal; Rathod, Kulav; Jadeja, Kumarpalsinh A.

    2015-01-01

    Existing Aditya tokamak with limiter configuration is being upgraded into a machine to have both the limiter and divertor configurations. Necessary modifications have been carried out to accommodate divertor coils by replacing the old vacuum vessel with a new circular section vacuum vessel. The upgraded Aditya tokamak will have different set of limiters and divertors, such as Safety limiter, Toroidal Inner limiter, outer limiter of smaller toroidal extent, Upper and lower divertor plates. The limiter and divertor locations inside the Aditya tokamak upgrade are decided based on the numerical simulation of the plasma equilibrium profiles. Initially graphite will be used as plasma facing material (PFM) in all the limiter and divertor plates. The dimensions of the limiter and divertor tiles are decided based on their installation inside the vacuum vessel as well as on the total plasma heat loads (∼ 1 MW) falling on them. Depending upon the heat loads; the thickness of graphite tiles for limiter and divertor plates is estimated. Shaped graphite tiles will be fixed on specially designed support structures made out of SS-304L inside the torus shaped vacuum vessel. In this paper mechanical structural design of limiter and divertor of Aditya Upgrade Tokamak is presented. (author)

  2. Upgrading BWR training simulators for annual outage operation training

    International Nuclear Information System (INIS)

    Yamakabe, K.; Nakajima, A.; Shiyama, H.; Noji, K.; Okabe, N.; Murata, F.

    2006-01-01

    Based upon the recently developed quality assurance program by the Japanese electric companies, BWR Operator Training Center (BTC) identified the needs to enhance operators' knowledge and skills for operations tasks during annual outage, and started to develop a dedicated operator training course specialized for them. In this paper, we present the total framework of the training course for annual outage operations and the associated typical three functions of our full-scope simulators specially developed and upgraded to conduct the training; namely, (1) Simulation model upgrade for the flow and temperature behavior concerning residual heat removal (RHR) system with shutdown cooling mode, (2) Addition of malfunctions for DC power supply equipment, (3) Simulation model upgrade for water filling operation for reactor pressurization (future development). We have implemented a trial of the training course by using the upgraded 800MW full-scope training simulator with functions (1) and (2) above. As the result of this trial, we are confident that the developed training course is effective for enhancing operators' knowledge and skills for operations tasks during annual outage. (author)

  3. Target area for Nova upgrade: Containing ignition and beyond

    International Nuclear Information System (INIS)

    Tobin, M.T.; Smith, J.R.; Campbell, D.; Wong, D.K.; Sullivan, J.A.; Pendergrass, J.; Weinstein, B.; Klein, M.

    1991-01-01

    The Lawrence Livermore National Laboratory (LLNL) is developing a conceptual design for upgrading the Nova laser from ∼ 50 kJ to ∼ 1.8 MJ of laser energy at a wavelength of 351 nm. Anticipated target performance includes achieving ignition and possibly fusion yields to 20 MJ. The target area design represents a unique challenge since it will be operating in a regime where first wall ablation and optics damage are major issues for the first time in an ICF facility. Here we describe potential performance criteria for the facility and anticipated yield-dependent x-ray, neutron, shrapnel, and debris environments. We also briefly describe the different systems that make up the target area and discuss some of the design issues. The insignificant environmental impact Nova Upgrade (NU) operations is anticipated to have on the laboratory and surrounding area is discussed. Finally, alternate design options are described along with their potential benefits

  4. Preliminary design of steam reformer in out-pile demonstration test facility for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Haga, Katsuhiro; Hino, Ryutaro; Inagaki, Yosiyuki; Hata, Kazuhiko; Aita, Hideki; Sekita, Kenji; Nishihara, Tetsuo; Sudo, Yukio [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment; Yamada, Seiya

    1996-11-01

    One of the key objectives of HTTR is to demonstrate effectiveness of high-temperature nuclear heat utilization system. Prior to connecting a heat utilization system to HTTR, an out-pile demonstration test is indispensable for the development of experimental apparatuses, operational control and safety technology, and verification of the analysis code of safety assessment. For the first heat utilization system of HTTR, design of the hydrogen production system by steam reforming is going on. We have proposed the out-pile demonstration test plan of the heat utilization system and conducted preliminary design of the test facility. In this report, design of the steam reformer, which is the principal component of the test facility, is described. In the course of the design, two types of reformers are considered. The one reformer contains three reactor tubes and the other contains one reactor tube to reduce the construction cost of the test facility. We have selected the steam reformer operational conditions and structural specifications by analyzing the steam reforming characteristics and component structural strength for each type of reformer. (author)

  5. Strategy for seismic upgrading of chemical plant taking productivity as criterion of judgment

    International Nuclear Information System (INIS)

    Oshima, M.; Kase, T.; Yashiro, H.; Fukushima, S.

    2005-01-01

    Seismic upgrading and modification of existing chemical plant facilities have been performed by means of a procedure of the Seismic Design Code and Guidelines of High-pressure Gas Facilities in Japan. Main purpose of this seismic design code is to ensure public safety at seismic events. From the viewpoints of seismic risk of corporate management, CSR (Corporate Social Responsibility) and productivity of the plants are also important for seismic assessment. In this paper, authors proposed strategy for seismic assessment to select appropriate pre-earthquake upgrading and modification considering productivity of plants based on fault tree analysis. This assessment will enable to select weak damage modes and to allocate countermeasure cost optimally to the selected damage modes. (authors)

  6. Introduction to the PBMR heat transfer test facility

    International Nuclear Information System (INIS)

    Rousseau, P.G.; Staden, M. van

    2008-01-01

    This paper provides an introduction to the Heat Transfer Test Facility (HTTF) that is currently being developed for PBMR (Pty.) Ltd. by M-Tech Industrial (Pty.) Ltd. in association with North-West University in South Africa. The paper provides an overview of the phenomena that will be studied and the envisaged test configurations for each of these phenomena. It also shows the layouts of the different test units namely the High Pressure Test Unit (HPTU) and the High Temperature Test Unit (HTTU) and provides an overview of the planned test schedule

  7. Ohmically heated toroidal experiment (OHTE) mobile ignition test reactor facility concept study

    International Nuclear Information System (INIS)

    Masson, L.S.; Watts, K.D.; Piscitella, R.R.; Sekot, J.P.; Drexler, R.L.

    1983-02-01

    This report presents the results of a study to evaluate the use of an existing nuclear test complex at the Idaho National Engineering Laboratory (INEL) for the assembly, testing, and remote maintenance of the ohmically heated toroidal experiment (OHTE) compact reactor. The portable reactor concept is described and its application to OHTE testing and maintenance requirements is developed. Pertinent INEL facilities are described and several test system configurations that apply to these facilities are developed and evaluated

  8. The droplet injection system used in the rod bundle heat transfer facility

    International Nuclear Information System (INIS)

    Frepoli, C.; Andrew, A.J.; Hochreiter, L.E.; Cheung, F.B.

    2001-01-01

    The full text follows. The US Nuclear Regulatory Commission (NRC) and the Pennsylvania State University are currently funding a research program entitled ''Rod Bundle Heat Transfer'' (RBHT). The main objective of the program is to investigate heat transfer during the core reflood period of a hypothetical Large Break Loss of Coolant Accident in a typical nuclear power plant. The RBHT test facility consists of a full-length 7 x 7 rod bundle. Information gathered by the RBHT test facility will be used for improvement of the reflood heat transfer models in the NRC's thermal hydraulic codes. In particular the RBHT data will be used to improve the understanding of individual heat transfer effects to the total rod heat transfer such that compensating errors present in current Best Estimate codes can be significantly reduced. The strategy in developing the test matrix is to use a ''building block'' approach in which simpler experiments are performed first to quantify a particular heat transfer mechanism alone and then the additional complications of the full two-phase flow, reflood film boiling behavior of the test facility are added in later experiments. One of these ''simpler'' experiments will be the injection of known size and velocity liquid droplets into the main stream of superheated steam. The droplet injection system consists of small diameter tubes inserted across the bundle at a given elevation. A number of equal size holes are drilled perpendicular to the surface in a triangular pitch. Water is forced into opposite ends of the tube and ejected from the holes. The injection system was tested using a digital imaging system known as VisiSizer. This system is capable of determining the diameter and velocity of small water droplets using a laser-illuminated digital camera system (LIDCS). Imaging software analyzes the digital images in real time to determine the distributions of droplet size and velocity. Pre-test analysis using COBRA-TF have been conducted to

  9. Directions in refining and upgrading of heavy oil and bitumen

    International Nuclear Information System (INIS)

    Dawson, B.; Parker, R. J.; Flint, L.

    1997-01-01

    The expansion of heavy oil transportation, marketing and refining facilities over the past two decades have been reviewed to show the strides that several Canadian refiners have taken to build up the facilities required to process synthetic crude oil (SCO). Key points made at a conference, convened by the National Centre for Upgrading Technology (NCUT), held in Edmonton during September 1997 to discuss current and future directions in the refining and marketing of heavy oil, bitumen and SCO, were summarized. Among the key points mentioned were: (1) the high entry barriers faced by centralized upgraders, (2) the advantages of integrating SCO or heavy oil production with downstream refining, (3) the stiff competition from Venezuela and Mexico that both SCO and heavy oil will face in the U.S. PADD II market, (4) the differences between Canadian refiners who have profited from hydrocracking and are better able to handle coker-based SCO, and American refiners who rely chiefly on catalytic cracking and are less able to process the highly aromatic SCO, and (5) the disproportionate cost in the upgrading process represented by the conversion of asphaltenes. Challenges and opportunities for key stakeholders, i.e. producers, refiners, marketers and technology licensors also received much attention at the Edmonton conference

  10. Effects of wastewater effluent discharge and treatment facility upgrades on environmental and biological conditions of the upper Blue River, Johnson County, Kansas and Jackson County, Missouri, January 2003 through March 2009

    Science.gov (United States)

    Graham, Jennifer L.; Stone, Mandy L.; Rasmussen, Teresa J.; Poulton, Barry C.

    2010-01-01

    The Johnson County Blue River Main Wastewater Treatment Facility discharges into the upper Blue River near the border between Johnson County, Kansas and Jackson County, Missouri. During 2005 through 2007 the wastewater treatment facility underwent upgrades to increase capacity and include biological nutrient removal. The effects of wastewater effluent on environmental and biological conditions of the upper Blue River were assessed by comparing an upstream site to two sites located downstream from the wastewater treatment facility. Environmental conditions were evaluated using previously and newly collected discrete and continuous data, and were compared with an assessment of biological community composition and ecosystem function along the upstream-downstream gradient. This evaluation is useful for understanding the potential effects of wastewater effluent on water quality, biological community structure, and ecosystem function. In addition, this information can be used to help achieve National Pollution Discharge Elimination System (NPDES) wastewater effluent permit requirements after additional studies are conducted. The effects of wastewater effluent on the water-quality conditions of the upper Blue River were most evident during below-normal and normal streamflows (about 75 percent of the time), when wastewater effluent contributed more than 20 percent to total streamflow. The largest difference in water-quality conditions between the upstream and downstream sites was in nutrient concentrations. Total and inorganic nutrient concentrations at the downstream sites during below-normal and normal streamflows were 4 to 15 times larger than at the upstream site, even after upgrades to the wastewater treatment facility were completed. However, total nitrogen concentrations decreased in wastewater effluent and at the downstream site following wastewater treatment facility upgrades. Similar decreases in total phosphorus were not observed, likely because the biological

  11. Upgraded wood residue fuels 1995; Foeraedlade traedbraenslen 1995

    Energy Technology Data Exchange (ETDEWEB)

    Vinterbaeck, J [Swedish Univ. of Agricultural Science, Uppsala (Sweden). Dept. of Forest-Industry-Market Studies

    1995-11-01

    The Swedish market for upgraded residue fuels, i.e. briquettes, pellets and wood powder, has developed considerably during the nineties. The additional costs for the upgrading processes are regained and create a surplus in other parts of the system, e.g. in the form of higher combustion efficiencies, lower investment costs for burning equipment, lower operation costs and a diminished environmental impact. All these factors put together have resulted in a rapid growth of this part of the energy sector. In 1994 the production was 1.9 TWh, an increase of 37 % compared to the previous year. In the forthcoming heating season 1995/96 the production may reach 4 TWh. 57 refs, 11 figs, 6 tabs

  12. Current radiography and tomography applications at Necsa and an envisaged upgrade towards a proposed South African national centre for radiography and tomography (SANCRAT)

    Energy Technology Data Exchange (ETDEWEB)

    Radebe, M.J.; De Beer, F.C. [Necsa - South African Nuclear Energy Corporation Limited, P. O.Box 582, Pretoria, 0001 (South Africa)

    2008-07-01

    An upgrade of the current Radiography and Tomography Research facilities is envisaged to enhance the group's support for Necsa's mission to undertake and support nuclear research and utilize penetrating radiation for the benefit of mankind. It is envisage that the SANCRAT will host neutron-, X-ray- and gamma ray penetrating radiation imaging infrastructures that can be utilized by researchers from industry as well as post graduate students from higher educational institutions. Modelling for the upgrade to a multifunctional neutron radiography and tomography facility has been underway. Upgrade plans and implementation has also begun for a 250 kV X-ray radiography set-up, that will exist independent from the neutron facility. Future expansion entails catering for a micro-focus X-ray -, and gamma ray radiography and tomography facilities. The current facilities available consist of one infrastructure facility based on two sources of penetrating radiation, i.e. SAFARI-1 research nuclear reactor as thermal neutron source and a 100 kV X-ray generator. This facility, which hosts the only operational neutron tomography R and D facility in the Southern Hemisphere and in Africa, are being extensively utilized by post graduate students and industry. The facility sees application in a wide range of scientific and engineering disciplines, amongst which is nuclear, geosciences, palaeontology, civil, mechanical, chemical, etc. This paper focus on case studies engaged at the current radiography and tomography facilities over the past 2 years as well as describing the envisaged upgrade initiatives to a fully equipped national centre. (authors)

  13. Current radiography and tomography applications at Necsa and an envisaged upgrade towards a proposed South African national centre for radiography and tomography (SANCRAT)

    International Nuclear Information System (INIS)

    Radebe, M.J.; De Beer, F.C.

    2008-01-01

    An upgrade of the current Radiography and Tomography Research facilities is envisaged to enhance the group's support for Necsa's mission to undertake and support nuclear research and utilize penetrating radiation for the benefit of mankind. It is envisage that the SANCRAT will host neutron-, X-ray- and gamma ray penetrating radiation imaging infrastructures that can be utilized by researchers from industry as well as post graduate students from higher educational institutions. Modelling for the upgrade to a multifunctional neutron radiography and tomography facility has been underway. Upgrade plans and implementation has also begun for a 250 kV X-ray radiography set-up, that will exist independent from the neutron facility. Future expansion entails catering for a micro-focus X-ray -, and gamma ray radiography and tomography facilities. The current facilities available consist of one infrastructure facility based on two sources of penetrating radiation, i.e. SAFARI-1 research nuclear reactor as thermal neutron source and a 100 kV X-ray generator. This facility, which hosts the only operational neutron tomography R and D facility in the Southern Hemisphere and in Africa, are being extensively utilized by post graduate students and industry. The facility sees application in a wide range of scientific and engineering disciplines, amongst which is nuclear, geosciences, palaeontology, civil, mechanical, chemical, etc. This paper focus on case studies engaged at the current radiography and tomography facilities over the past 2 years as well as describing the envisaged upgrade initiatives to a fully equipped national centre. (authors)

  14. A Neutral Beam Injector Upgrade for NSTX

    International Nuclear Information System (INIS)

    Stevenson, T.; McCormack, B.; Loesser, G.D.; Kalish, M.; Ramakrishnan, S.; Grisham, L.; Edwards, J.; Cropper, M.; Rossi, G.; Halle, A. von; Williams, M.

    2002-01-01

    The National Spherical Torus Experiment (NSTX) capability with a Neutral Beam Injector (NBI) capable of 80 kiloelectronvolt (keV), 5 Megawatt (MW), 5 second operation. This 5.95 million dollar upgrade reused a previous generation injector and equipment for technical, cost, and schedule reasons to obtain these specifications while retaining a legacy capability of 120 keV neutral particle beam delivery for shorter pulse lengths for possible future NSTX experiments. Concerns with NBI injection included power deposition in the plasma, aiming angles from the fixed NBI fan array, density profiles and beam shine through, orbit losses of beam particles, and protection of the vacuum vessel wall against beam impingement. The upgrade made use of the beamline and cryo panels from the Neutral Beam Test Stand facility, existing power supplies and controls, beamline components and equipment not contaminated by tritium during DT [deuterium-tritium] experiments, and a liquid Helium refrigerator plant to power and cryogenically pump a beamline and three ion sources. All of the Tokamak Fusion Test Reactor (TFTR) ion sources had been contaminated with tritium, so a refurbishment effort was undertaken on selected TFTR sources to rid the three sources destined for the NSTX NBI of as much tritium as possible. An interconnecting duct was fabricated using some spare and some new components to attach the beamline to the NSTX vacuum vessel. Internal vacuum vessel armor using carbon tiles was added to protect the stainless steel vacuum vessel from beam impingement in the absence of plasma and interlock failure. To date, the NBI has operated to 80 keV and 5 MW and has injected requested power levels into NSTX plasmas with good initial results, including high beta and strong heating characteristics at full rated plasma current

  15. HOM Survey of the First CEBAF Upgrade Style Cavity Pair

    International Nuclear Information System (INIS)

    Marhauser, Frank; Daly, Edward; Davis, G.; Drury, Michael; Grenoble, Christiana; Hogan, John; Manus, Robert; Preble, Joseph; Reece, Charles; Rimmer, Robert; Tian, Kai; Wang, Haipeng

    2009-01-01

    The planned upgrade of the Continuous Electron Beam Accelerator Facility (CEBAF) at the Thomas Jefferson National Accelerator Laboratory (JLab) requires ten new superconducting rf (SRF) cavity cryomodules to double the beam energy to the envisaged 12 GeV. Adequate cavity Higher Order Mode (HOM) suppression is essential to avoid multipass, multibunch beam break-up (BBU) instabilities of the recirculating beam. We report on detailed HOM surveys performed for the first two upgrade style cavities tested in a dedicated cavity pair cryomodule at 2K. The safety margin to the BBU threshold budget at 12 GeV has been assessed.

  16. Progress in MPC and A upgrades at Luch

    International Nuclear Information System (INIS)

    Mizin, P.; Chukov, V.; Rogatchev, V.; Curtiss, J.; Erkkila, B.; Goodey, K.; Hembree, D. Jr.; Lowe, D.; Turner, C.

    1997-01-01

    Luch, a MINATOM facility, has been engaged in both scientific research and uranium processing for fifty years. Since the spring of 1996, Luch has participated in a program of US/Russia Cooperation in Nuclear MPC and A Upgrades. The program began with planning for immediate upgrades in MPC and A, with en emphasis on physical protection. In addition, US and Luch experts exchanged technical data during a number of workshops, to establish a common understanding of available MPC and A tools and equipment. Site characterizations and vulnerability assessments were then prepared by Luch, to form the basis for the current program of methodical upgrades in all areas of MPC and A. Access control, alarms and alarm communications are being improved as part of this program. Control of nuclear material is being enhanced through improvements in material monitoring and in transportation security when nuclear material is moved between buildings on the Luch site. A comprehensive, site-wide computer network for Luch was designed during a recent workshop. Acquiring and installing this computer system, complete with COREMAS software, is currently in progress. Nuclear material analysis will be improved through NDA techniques using Canberra InSpector systems. The planned upgrades in nuclear MPC and A will reinforce safeguards over large quantities of HEU at Luch

  17. Recent improvements of the tandem facility at LNS

    International Nuclear Information System (INIS)

    Ciavola, G.; Calabretta, L.; Cuttone, G.; Gammino, S.; Raia, G.; Rifuggiato, D.; Rovelli, A.; Scuderi, V.

    1993-01-01

    The Laboratorio Nazionale del Sud (LNS) of Catania is equipped with an upgraded 15 MV SMP tandem that is going to be coupled to a k=800 superconducting cyclotron. The status of the facility and the performances of the upgraded tandem are presented. (orig.)

  18. Test facility for investigation of heat transfer of promising coolants for the nuclear power industry

    Science.gov (United States)

    Belyaev, I. A.; Sviridov, V. G.; Batenin, V. M.; Biryukov, D. A.; Nikitina, I. S.; Manchkha, S. P.; Pyatnitskaya, N. Yu.; Razuvanov, N. G.; Sviridov, E. V.

    2017-11-01

    The results are presented of experimental investigations into liquid metal heat transfer performed by the joint research group consisting of specialist in heat transfer and hydrodynamics from NIU MPEI and JIHT RAS. The program of experiments has been prepared considering the concept of development of the nuclear power industry in Russia. This concept calls for, in addition to extensive application of water-cooled, water-moderated (VVER-type) power reactors and BN-type sodium cooled fast reactors, development of the new generation of BREST-type reactors, fusion power reactors, and thermonuclear neutron sources. The basic coolants for these nuclear power installations will be heavy liquid metals, such as lead and lithium-lead alloy. The team of specialists from NRU MPEI and JIHT RAS commissioned a new RK-3 mercury MHD-test facility. The major components of this test facility are a unique electrical magnet constructed at Budker Nuclear Physics Institute and a pressurized liquid metal circuit. The test facility is designed for investigating upward and downward liquid metal flows in channels of various cross-sections in a transverse magnetic field. A probe procedure will be used for experimental investigation into heat transfer and hydrodynamics as well as for measuring temperature, velocity, and flow parameter fluctuations. It is generally adopted that liquid metals are the best coolants for the Tokamak reactors. However, alternative coolants should be sought for. As an alternative to liquid metal coolants, molten salts, such as fluorides of lithium and beryllium (so-called FLiBes) or fluorides of alkali metals (so-called FLiNaK) doped with uranium fluoride, can be used. That is why the team of specialists from NRU MPEI and JIHT RAS, in parallel with development of a mercury MHD test facility, is designing a test facility for simulating molten salt heat transfer and hydrodynamics. Since development of this test facility requires numerical predictions and verification

  19. Extension of the ECRH operational space with O2 and X3 heating schemes to control tungsten accumulation in ASDEX Upgrade

    Science.gov (United States)

    Höhnle, H.; Stober, J.; Herrmann, A.; Kasparek, W.; Leuterer, F.; Monaco, F.; Neu, R.; Schmid-Lorch, D.; Schütz, H.; Schweinzer, J.; Stroth, U.; Wagner, D.; Vorbrugg, S.; Wolfrum, E.; ASDEX Upgrade Team

    2011-08-01

    ASDEX Upgrade has been operated with tungsten-coated plasma-facing components for several years. H-mode operation with good confinement has been demonstrated. Nevertheless, purely neutral beam injection-heated H-modes with reduced gas puff, moderate heating power or/and increased triangularity tend to accumulate tungsten, followed by a radiative collapse. Under these conditions, central electron heating with electron cyclotron resonance heating (ECRH), usually in X2 polarization, changes the impurity transport in the plasma centre, reducing the central tungsten concentration and, in many cases, stabilizing the plasma. In order to extend the applicability of central ECRH to a wider range of magnetic field and plasma current additional ECRH schemes with reduced single-pass absorption have been implemented: X3 heating allows us to reduce the magnetic field by 30%, such that the first H-modes with an ITER-like value of the safety factor of q95 = 3 could be run in the tungsten-coated device. O2 heating increases the cutoff density by a factor of 2 allowing higher currents and triangularities to be addressed. For both schemes, scenarios have been developed to cope with the associated reduced absorption. In the case of central X3 heating, the X2 resonance lies close to the pedestal top at the high-field side of the plasma, serving as a beam dump. For O2, holographic mirrors have been developed which guarantee a second pass through the plasma centre. The beam position on these reflectors is controlled by fast thermocouples. Stray-radiation protection has been implemented using sniffer probes.

  20. Extension of the ECRH operational space with O2 and X3 heating schemes to control tungsten accumulation in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Hoehnle, H.; Kasparek, W.; Stroth, U.; Stober, J.; Herrmann, A.; Leuterer, F.; Monaco, F.; Neu, R.; Schmid-Lorch, D.; Schuetz, H.; Schweinzer, J.; Wagner, D.; Vorbrugg, S.; Wolfrum, E.

    2011-01-01

    ASDEX Upgrade has been operated with tungsten-coated plasma-facing components for several years. H-mode operation with good confinement has been demonstrated. Nevertheless, purely neutral beam injection-heated H-modes with reduced gas puff, moderate heating power or/and increased triangularity tend to accumulate tungsten, followed by a radiative collapse. Under these conditions, central electron heating with electron cyclotron resonance heating (ECRH), usually in X2 polarization, changes the impurity transport in the plasma centre, reducing the central tungsten concentration and, in many cases, stabilizing the plasma. In order to extend the applicability of central ECRH to a wider range of magnetic field and plasma current additional ECRH schemes with reduced single-pass absorption have been implemented: X3 heating allows us to reduce the magnetic field by 30%, such that the first H-modes with an ITER-like value of the safety factor of q 95 = 3 could be run in the tungsten-coated device. O2 heating increases the cutoff density by a factor of 2 allowing higher currents and triangularities to be addressed. For both schemes, scenarios have been developed to cope with the associated reduced absorption. In the case of central X3 heating, the X2 resonance lies close to the pedestal top at the high-field side of the plasma, serving as a beam dump. For O2, holographic mirrors have been developed which guarantee a second pass through the plasma centre. The beam position on these reflectors is controlled by fast thermocouples. Stray-radiation protection has been implemented using sniffer probes.

  1. Low grade waste heat recovery using heat pumps and power cycles

    International Nuclear Information System (INIS)

    Bor, D.M. van de; Infante Ferreira, C.A.; Kiss, Anton A.

    2015-01-01

    Thermal energy represents a large part of the global energy usage and about 43% of this energy is used for industrial applications. Large amounts are lost via exhaust gases, liquid streams and cooling water while the share of low temperature waste heat is the largest. Heat pumps upgrading waste heat to process heat and cooling and power cycles converting waste heat to electricity can make a strong impact in the related industries. The potential of several alternative technologies, either for the upgrading of low temperature waste heat such as compression-resorption, vapor compression and trans-critical heat pumps, or for the conversion of this waste heat by using organic Rankine, Kalina and trilateral cycle engines, are investigated with regards to energetic and economic performance by making use of thermodynamic models. This study focuses on temperature levels of 45–60 °C as at this temperature range large amounts of heat are rejected to the environment but also investigates the temperature levels for which power cycles become competitive. The heat pumps deliver 2.5–11 times more energy value than the power cycles in this low temperature range at equal waste heat input. Heat engines become competitive with heat pumps at waste heat temperatures at 100 °C and above. - Highlights: • Application of heat pump technology for heating and cooling. • Compression resorption heat pumps operating with large glides approaching 100 K. • Compression-resorption heat pumps with wet compression. • Potential to convert Industrial waste heat to power or high grade heat. • Comparison between low temperature power cycles and heat pumps

  2. Upgrades and Real Time Ntm Control Application of the Ece Radiometer on Asdex Upgrade

    Science.gov (United States)

    Hicks, N. K.; Suttrop, W.; Behler, K.; Giannone, L.; Manini, A.; Maraschek, M.; Raupp, G.; Reich, M.; Sips, A. C. C.; Stober, J.; Treutterer, W.; ASDEX Upgrade Team; Cirant, S.

    2009-04-01

    The 60-channel electron cyclotron emission (ECE) radiometer diagnostic on the ASDEX Upgrade tokamak is presently being upgraded to include a 1 MHz sampling rate data acquisition system. This expanded capability allows electron temperature measurements up to 500 kHz (anti-aliasing filter cut-off) with spatial resolution ~1 cm, and will thus provide measurement of plasma phenomena on the MHD timescale, such as neoclassical tearing modes (NTMs). The upgraded and existing systems may be run in parallel for comparison, and some of the first plasma measurements using the two systems together are presented. A particular planned application of the upgraded radiometer is integration into a real-time NTM stabilization loop using targeted deposition of electron cyclotron resonance heating (ECRH). For this loop, it is necessary to determine the locations of the NTM and ECRH deposition using ECE measurements. As the magnetic island of the NTM repeatedly rotates through the ECE line of sight, electron temperature fluctuations at the NTM frequency are observed. The magnetic perturbation caused by the NTM is independently measured using Mirnov coils, and a correlation profile between these magnetic measurements and the ECE data is constructed. The phase difference between ECE oscillations on opposite sides of the island manifests as a zero-crossing of the correlation profile, which determines the NTM location in ECE channel space. To determine the location of ECRH power deposition, the power from a given gyrotron may be modulated at a particular frequency. Correlation analysis of this modulated signal and the ECE data identifies a particular ECE channel associated with the deposition of that gyrotron. Real time equilibrium reconstruction allows the ECE channels to be translated into flux surface and spatial coordinates for use in the feedback loop.

  3. High heat flux test of tungsten brazed mock-ups developed for KSTAR divertor

    Energy Technology Data Exchange (ETDEWEB)

    Song, J.H. [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, K.M., E-mail: kyungmin@nfri.re.kr [National Fusion Research Institute, Daejeon (Korea, Republic of); Hong, S.H.; Kim, H.T.; Park, S.H.; Park, H.K.; Ahn, H.J. [National Fusion Research Institute, Daejeon (Korea, Republic of); Kim, S.K.; Lee, D.W. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-11-01

    The tungsten (W) brazed flat type mock-up which consists of W, OFHC-Cu (oxygen-free high conductive copper) and CuCrZr alloy has been designed for KSTAR divertor in preparation for KSTAR upgrade with 17 MW heating power. For verification of the W brazed mock-up, the high heat flux test is performed at KoHLT-EB (Korea High Heat Load Test Facility-Electron Beam) in KAERI (Korea Atomic Energy Research Institute). Three mock-ups are tested for several thousand thermal cycles with absorbed heat flux up to 5 MW/m{sup 2} for 20 s duration. There is no evidence of the failure at the bonding joints of all mock-ups after HHF test. Finite element analysis (FEA) is performed to interpret the result of the test. As a result, it is considered that the local area in the water is in the subcooled boiling regime.

  4. The FELIX experimental program and future upgrades

    International Nuclear Information System (INIS)

    Turner, L.R.; Praeg, W.F.; Lari, R.J.; Wehrle, R.B.

    1981-01-01

    As part of the DOE First Wall/Blanket/Shield (FW/B/S) Engineering Test Program, Argonne National Laboratory FELIX (Fusion ELectromagnetic Induction EXperiment to study electromagnetic effects. T.he earliest test will select and verify appropriate eddy current simulation computer program (codes), followed by component concept tests, component model tests, and finally tests with prototypes. This paper describes the experimental and computer code plans and future upgrades for the FELIX facility

  5. Upgrading of bitumen using supercritical water

    Energy Technology Data Exchange (ETDEWEB)

    Kayukawa, T. [JGC Corp., Ibaraki (Japan)

    2009-07-01

    This presentation outlined the technical and economic aspects of thermal cracking by supercritical water. Supercritical water (SCW) is a commonly used method for upgrading heavy oil to produce pipeline-transportable oil from high-viscous bitumen. The process uses water and does not require hydrogen nor catalysts. Pre-heated bitumen and water enter a vertical reactor with flows of counter current at the supercritical point of water. The upgraded synthetic crude oil (SCO) and pitch are obtained from the top of the reactor when the bitumen is thermally cracked. Bench-scale studies have shown that Canadian oil sands bitumen can be converted to 80 volume per cent of SCO and 20 volume per cent of pitch. The SCO has satisfied Canadian pipeline specifications in terms of API gravity and kinetic viscosity. The kinetic viscosity of the pitch has also satisfied boiler fuel specifications. tabs., figs.

  6. Upgrade of the CMS hardron calorimeter for an upgraded LHC

    OpenAIRE

    Anderson, Jake

    2012-01-01

    The CMS barrel and endcap hadron calorimeters (Hcal) upgrading the current photo-sensors are hybrid photodiodes (HPDs) to meet the demands of the upgraded luminosity of the LHC. A key aspect of the Hcal upgrade is to add longitudinal segmentation to improve background rejection, energy resolution, and electron isolation at L1 trigger. The increased segmentation can be achieved by replacing the HPD's with multi-pixel Geiger-mode avalanche photodiodes. The upgraded electron...

  7. Accelerator-driven subcritical facility:Conceptual design development

    Science.gov (United States)

    Gohar, Yousry; Bolshinsky, Igor; Naberezhnev, Dmitry; Duo, Jose; Belch, Henry; Bailey, James

    2006-06-01

    A conceptual design development of an accelerator-driven subcritical facility has been carried out in the preparation of a joint activity with Kharkov Institute of Physics and Technology of Ukraine. The main functions of the facility are the medical isotope production and the support of the Ukraine nuclear industry. An electron accelerator is considered to drive the subcritical assembly. The neutron source intensity and spectrum have been studied. The energy deposition, spatial neutron generation, neutron utilization fraction, and target dimensions have been quantified to define the main target performance parameters, and to select the target material and beam parameters. Different target conceptual designs have been developed based the engineering requirements including heat transfer, thermal hydraulics, structure, and material issues. The subcritical assembly is designed to obtain the highest possible neutron flux level with a Keff of 0.98. Different fuel materials, uranium enrichments, and reflector materials are considered in the design process. The possibility of using low enrichment uranium without penalizing the facility performance is carefully evaluated. The mechanical design of the facility has been developed to maximize its utility and minimize the time for replacing the target and the fuel assemblies. Safety, reliability, and environmental considerations are included in the facility conceptual design. The facility is configured to accommodate future design improvements, upgrades, and new missions. In addition, it has large design margins to accommodate different operating conditions and parameters. In this paper, the conceptual design and the design analyses of the facility will be presented.

  8. Feasibility Study of SSTO Base Heating Simulation in Pulsed-Type Facilities

    Science.gov (United States)

    Park, Chung Sik; Sharma, Surendra; Edwards, Thomas A. (Technical Monitor)

    1995-01-01

    A laboratory simulation of the base heating environment of the proposed reusable Single-Stage-To-Orbit vehicle during its ascent flight was proposed. The rocket engine produces CO2 and H2, which are the main combustible components of the exhaust effluent. The burning of these species, known as afterburning, enhances the base region gas temperature as well as the base heating. To determine the heat flux on the SSTO vehicle, current simulation focuses on the thermochemistry of the afterburning, thermophysical properties of the base region gas, and ensuing radiation from the gas. By extrapolating from the Saturn flight data, the Damkohler number for the afterburning of SSTO vehicle is estimated to be of the order of 10. The limitations on the material strengths limit the laboratory simulation of the flight Damkohler number as well as other flow parameters. A plan is presented in impulse facilities using miniature rocket engines which generate the simulated rocket plume by electric ally-heating a H2/CO2 mixture.

  9. Design of helium-gas supplying facility of out-of-pile demonstration test for HTTR heat utilization system

    Energy Technology Data Exchange (ETDEWEB)

    Hino, Ryutaro; Fujisaki, Katsuo; Kobayashi, Toshiaki [Japan Atomic Energy Research Inst., Oarai, Ibaraki (Japan). Oarai Research Establishment] [and others

    1996-09-01

    One of the objectives of the High-Temperature Engineering Test Reactor (HTTR) is to demonstrate effectiveness of high-temperature heat utilization. Prior to connect a heat utilization system to the HTTR, a series of out-of-pile demonstration test is indispensable to improve components` performance, to demonstrate operation, control and safety technologies and to verify analysis codes for design and safety evaluation. After critical review and discussion on the out-of-pile demonstration test, a test facility have been designed. In this report, a helium-gas supplying facility simulated the HTTR system was described in detail, which supplies High-temperature helium-gas of 900degC to a steam reforming facility mocking-up the HTTR heat utilization system. Components of the Helium Engineering Demonstration Loop (HENDEL) were selected to reuse in the helium-gas supplying facility in order to decrease construction cost. Structures and specifications of new components such as a high-temperature heater and a preheater were decided after evaluation of thermal and hydraulic performance and strength. (author)

  10. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    International Nuclear Information System (INIS)

    Pandya, Kaushal; Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh; Yadav, Ratnakar K.; Mahesh, Vuppugalla; Tyagi, Himanshu; Parmar, KanuG.; Mistri, Hiren; Bhagora, Jighesh; Prajapati, Bhavesh; Patel, Kartik; Bhuyan, Manas; Gouswami, Mehul; Bandyopadhyay, Mainak; Chakraborty, Arun K.

    2017-01-01

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  11. System upgradation for surface mode negative ion beam extraction experiments in ROBIN

    Energy Technology Data Exchange (ETDEWEB)

    Pandya, Kaushal, E-mail: kpandya@ipr.res.in [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bansal, Gourab; Gahlaut, Agrajit; Soni, Jignesh [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Yadav, Ratnakar K. [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Mahesh, Vuppugalla [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Tyagi, Himanshu [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Parmar, KanuG.; Mistri, Hiren [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhagora, Jighesh [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Prajapati, Bhavesh; Patel, Kartik [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India); Bhuyan, Manas [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Gouswami, Mehul [Bhakti Management Services, Gandhinagar, 382007, Gujarat (India); Bandyopadhyay, Mainak [ITER-India, Institute for Plasma Research, Gandhinagar, Gujarat (India); Chakraborty, Arun K. [Institute for Plasma Research, Near Indira Bridge, Bhat, Gandhinagar, 382428, Gujarat (India)

    2017-01-15

    Operational commissioning of ROBIN forms an important milestone in the Indian programme on the R&D on negative ion beams. The commissioning activity has been effected in sequence, in synchronisation with the availability of High voltage Power Supply (HVPS) systems and routine operation has now been established in the cesiated, surface mode. Significant efforts have been placed in upgrading the system to initiate the surface mode operation. These include incorporation of a temperature controlled Cesium (Cs) delivery system, spectroscopic diagnostics for detection of Cs lines, installation of plasma grid heating and closed loop warm water circuit for source components heating and Doppler Shift Spectroscopy (DSS) system. The specific design and integration features for these upgrades are discussed and preliminary results obtained from the operation of ROBIN in the surface mode are presented.

  12. Safety system upgrades to a research reactor: A regulatory perspective

    International Nuclear Information System (INIS)

    Lamarre, G.B.; Martin, W.G.

    2003-01-01

    The NRU (National Research Universal) reactor, located at the Chalk River Laboratories of Atomic Energy of Canada Limited (AECL), first achieved criticality November 3, 1957. AECL continues to operate NRU for research to support safety and reliability studies for CANDU reactors and as a major supplier of medical radioisotopes. Following a detailed systematic review and assessment of NRU's design and the condition of its primary systems, AECL formally notified the Canadian Nuclear Safety Commission's (CNSC) predecessor - the Atomic Energy Control Board - in 1992 of its intention to upgrade NRU's safety systems. AECL proposed seven major upgrades to provide improvements in shutdown capability, heat removal, confinement, and reactor monitoring, particularly during and after a seismic event. From a CNSC perspective, these upgrades were necessary to meet modern safety standards. From the start of the upgrades project, the CNSC provided regulatory oversight aimed at ensuring that AECL maintained a structured approach to the upgrades. The elements of the approach include, but are not limited to, the determination of project milestones and target dates; the formalization of the design process and project quality assurance requirements; the requirements for updated documentation, including safety reports, safety notes and commissioning reports; and the approval and authorization process. This paper details, from a regulatory perspective, the structured approach used in approving the design, construction, commissioning and subsequent operation of safety system upgrades for an existing and operating research reactor, including the many challenges faced when attempting to balance the requirements of the upgrades project with AECL's need to keep NRU operating to meet its important research and production objectives. (author)

  13. OPERATIONAL EXPERIENCE: UPGRADED MPC AND A SYSTEMS FOR THE RADIOCHEMICAL PLANT OF THE SIBERIAN CHEMICAL COMBINE

    International Nuclear Information System (INIS)

    RODRIGUEZ, C.; GOLOSKOKOV, I.; FISHBONE, L.; GOODEY, K.; LOOMIS, M.; CRAIN, B. JR.; LARSEN, R.

    2003-01-01

    The success of reducing the risk of nuclear proliferation through physical protection and material control/accounting systems depends upon the development of an effective design that includes consideration of the objectives of the systems and the resources available to implement the design. Included among the objectives of the design are facility characterization, definition of threat, and identification of targets. When considering resources, the designer must consider funds available, rapid low-cost elements, technology elements, human resources, and the availability of resources to sustain operation of the end system. The Siberian Chemical Combine (SCC) is a multi-function nuclear facility located in the Tomsk region of Siberia, Russia. Beginning in 1996, SCC joined with the United States Department of Energy (US/DOE) Material Protection, Control, and Accounting (MPC and A) Program to develop and implement MPC and A upgrades for the Radiochemical, Chemical Metallurgical, Conversion, Uranium Enrichment, and Reactor Plants of the SCC. At the Radiochemical Plant the MPC and A design and implementation process has been largely completed for the Plutonium Storage Facility and related areas of the Radiochemical Plant. Design and implementation of upgrades for the Radiochemical Plant include rapid physical protection upgrades such as bricking up of doors and windows, and installation of security-hardened doors. Rapid material control and accounting upgrades include installation of modern balances and bar code equipment. Comprehensive MPC and A upgrades include the installation of access controls to sensitive areas of the Plant, alarm communication and display (AC and D) systems to detect and annunciate alarm conditions, closed circuit (CCTV) systems to assess alarm conditions, central and secondary alarm station upgrades that enable security forces to assess and respond to alarm conditions, material control and accounting upgrades that include upgraded physical

  14. Westinghouse Hanford Company safety analysis reports and technical safety requirements upgrade program

    International Nuclear Information System (INIS)

    Busche, D.M.

    1995-09-01

    During Fiscal Year 1992, the US Department of Energy, Richland Operations Office (RL) separately transmitted the following US Department of Energy (DOE) Orders to Westinghouse Hanford Company (WHC) for compliance: DOE 5480.21, ''Unreviewed Safety Questions,'' DOE 5480.22, ''Technical Safety Requirements,'' and DOE 5480.23, ''Nuclear Safety Analysis Reports.'' WHC has proceeded with its impact assessment and implementation process for the Orders. The Orders are closely-related and contain some requirements that are either identical, similar, or logically-related. Consequently, WHC has developed a strategy calling for an integrated implementation of the three Orders. The strategy is comprised of three primary objectives, namely: Obtain DOE approval of a single list of DOE-owned and WHC-managed Nuclear Facilities, Establish and/or upgrade the ''Safety Basis'' for each Nuclear Facility, and Establish a functional Unreviewed Safety Question (USQ) process to govern the management and preservation of the Safety Basis for each Nuclear Facility. WHC has developed policy-revision and facility-specific implementation plans to accomplish near-term tasks associated with the above strategic objectives. This plan, which as originally submitted in August 1993 and approved, provided an interpretation of the new DOE Nuclear Facility definition and an initial list of WHC-managed Nuclear Facilities. For each current existing Nuclear Facility, existing Safety Basis documents are identified and the plan/status is provided for the ISB. Plans for upgrading SARs and developing TSRs will be provided after issuance of the corresponding Rules

  15. Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    Energy Technology Data Exchange (ETDEWEB)

    Hillairet, Julien, E-mail: julien.hillairet@cea.fr; Mollard, Patrick; Bernard, Jean-Michel; Argouarch, Arnaud; Berger-By, Gilles; Charabot, Nicolas; Colas, Laurent; Delaplanche, Jean-Marc; Ekedahl, Annika; Fedorczak, Nicolas; Ferlay, Fabien; Goniche, Marc; Hatchressian, Jean-Claude; Helou, Walid; Jacquot, Jonathan; Joffrin, Emmanuel; Litaudon, Xavier; Lombard, Gilles; Magne, Roland; Patterlini, Jean-Claude [CEA, IRFM, F-13108 Saint Paul-lez-Durance (France); and others

    2015-12-10

    The design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V{sub r}/V{sub f} and SHAD systems.

  16. TMX-U [Tandem Mirror Experiment-Upgrade] tandem-mirror thermal-barrier experiments

    International Nuclear Information System (INIS)

    Simonen, T.C.; Allen, S.L.; Baldwin, D.E.

    1986-01-01

    Thermal-barrier experiments have been carried out in the Tandem Mirror Experiment-Upgrade (TMX-U). Measurements of nonambipolar and ambipolar radial transport show that these transport processes, as well as end losses, can be controlled at modest densities and durations. Central-cell heating methods using ion-cyclotron heating (ICH) and neutral-beam injection have been demonstrated. Potential mesurements with recently developed methods indicate that deep thermal barriers can be established

  17. The high-heat-flux test facilities in the joint stock company “D.V. Efremov Institute of Electrophysical Apparatus”

    Energy Technology Data Exchange (ETDEWEB)

    Volodin, A., E-mail: volodin@sintez.niiefa.spb.su [JSC “NIIEFA”, 196641 St. Petersburg (Russian Federation); Kuznetcov, V.; Davydov, V.; Kokoulin, A.; Komarov, A.; Mazul, I.; Mudyugin, B.; Ovchinnikov, I.; Stepanov, N.; Rulev, R.; Eremkin, A.; Rogov, A.; Prianikov, V. [JSC “NIIEFA”, 196641 St. Petersburg (Russian Federation); Fedosov, A. [ITER Organization, Building 81/124, TKM, Internal Components Division, Route de Vinon-sur-Verdon, CS 90 046, 13067 St Paul Lez Durance Cedex (France)

    2015-10-15

    Highlights: • The IDTF was created for the high heat flux tests of the PFUs of the ITER divertor. • At the present on the TSEFEY-M a brazing of fingers a FW semi-prototype is performing. • The IDTF and TSEFEY-M facilities are ready for the HHF testing of the ITER components. - Abstract: The current ITER design involves beryllium and tungsten as plasma facing materials for in-vessel components. Due to a high number of operating cycles and to the expected surface heat loads, thermal fatigue is one of the most damaging mechanisms for the plasma facing components (PFCs) of the ITER machine. Therefore, it is essential to perform an assessment of the behavior of PFCs under cycling heat loads to demonstrate the fitness for purpose of the selected technologies. This article summarizes the features of high heat flux facilities designed and constructed in the Efremov Institute for the performance of high heat flux (HHF) tests under ITER procurements as well as related R&D works. The TSEFEY-M facility was commissioned in 1994. The main purpose of this facility is thermal fatigue testing of mock-ups with various plasma-facing materials (carbon fiber reinforced composite (CFC), tungsten, beryllium, etc.) and with various cooling agents (water or gas). The ITER divertor test facility (IDTF) was created in the framework of ITER project, specifically for the HHF tests of the vertical targets (inner and outer) and domes of the ITER divertor. After commissioning in 2008, the IDTF facility was qualified in 2012–2013 for HHF tests of ITER PFCs.

  18. Commissioning activities and first results from the collective Thomson scattering diagnostic on ASDEX Upgrade (invited)

    DEFF Research Database (Denmark)

    Meo, Fernando; Bindslev, Henrik; Korsholm, Søren Bang

    2008-01-01

    of the system. First results in near perpendicular of scattered spectra in a neutral beam injection (NBI) and ion cyclotron resonance heating (ICRH) plasma (minority hydrogen) on ASDEX Upgrade have shown evidence of ICRH heating phase of hydrogen. ©2008 American Institute of Physics...

  19. 41 CFR 102-74.185 - What heating and cooling policy must Federal agencies follow in Federal facilities?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false What heating and cooling... heating and cooling policy must Federal agencies follow in Federal facilities? Within the limitations of the building systems, Federal agencies must— (a) Operate heating and cooling systems in the most...

  20. The Bevalac Upgrade Project

    International Nuclear Information System (INIS)

    Alonso, J.R.; Dwinell, R.D.; Feinberg, B.

    1987-03-01

    This paper describes a proposed upgrade of the Bevalac accelerator complex in which the present Bevatron is replaced with a modern, strong-focusing 17 T-m synchrotron. This new ring is designed to accelerate all ions throughout the periodic table with intensities 100 to 1000 times higher than the present Bevatron. It will also provide a substantially improved beam spill structure and will reduce operating costs. A fast extraction capability can be used to inject a future heavy ion storage ring. Pulse-to-pulse switching of energy and ion species is an important goal. The existing injectors, shielding, experimental facilities and utilities of the present Bevalac will remain substantially intact

  1. Application of risk assessment in upgrading safety and quality of radiochemical operations

    International Nuclear Information System (INIS)

    Lin, K.H.; Hightower, J.R.; Vaughen, V.C.A.

    1990-01-01

    A Comprehensive Safety Assessment and Upgrade Program (CSAUP) was commenced by the Chemical Technology Division (Chem Tech) at Oak Ridge National Laboratory (ORNL) to achieve excellence in the safety and quality of its operations and condition of its facilities. In the course of conducting CSAUP, a number of issues of concern were identified. The safety risk of these issues has been assessed, and planned actions were prepared for those issues that require corrective actions or improvement/upgrading. The planned actions were evaluated on consideration for the uniqueness of Chem Tech facilities and operations to determine the risks (high, moderate or low) involved by failure to implement the actions. The risk was defined in terms of the frequency and severity of impact. Priority of categorized actions was based on the urgency of the actions. 2 refs., 1 fig., 3 tabs

  2. Mark 1 Test Facility

    Data.gov (United States)

    Federal Laboratory Consortium — The Mark I Test Facility is a state-of-the-art space environment simulation test chamber for full-scale space systems testing. A $1.5M dollar upgrade in fiscal year...

  3. EXPERIENCE AND PLANS OF THE JLAB FEL FACILITY AS A USER FACILITY

    Energy Technology Data Exchange (ETDEWEB)

    Michelle D. Shinn

    2007-08-26

    Jefferson Lab's IR Upgrade FEL building was planned from the beginning to be a user facility, and includes an associated 600 m2 area containing seven laboratories. The high average power capability (multikilowatt-level) in the near-infrared (1-3 microns), and many hundreds of watts at longer wavelengths, along with an ultrafast (~ 1 ps) high PRF (10's MHz) temporal structure makes this laser a unique source for both applied and basic research. In addition to the FEL, we have a dedicated laboratory capable of delivering high power (many tens of watts) of broadband THz light. After commissioning the IR Upgrade, we once again began delivering beam to users in 2005. In this presentation, I will give an overview of the FEL facility and its current performance, lessons learned over the last two years, and a synopsis of current and future experiments.

  4. UPGRADES

    CERN Document Server

    D. Contardo and J. Spalding

    2013-01-01

    There is very good progress in the execution of the LS1 projects and in launching construction of the Phase 1 upgrades. We focus here on two main achievements since the last CMS Week. The approval of the third Phase 1 TDR The preparation of the L1 Trigger Upgrade Technical Design Report has been a major effort of the collaboration at the beginning of this year, especially to develop supporting Trigger menu and physics performance studies. These studies have demonstrated the efficiency of the upgraded system to ensure low lepton and jet trigger thresholds, leading to a significant increase of the acceptance for the Higgs measurements, in the associated production mode and in the ττ decays, as well as for the stop searches involving multiple jets in the final state. The TDR was submitted to the LHCC in May and approved at the June committee meeting. It is now a public document, completing the series of the three TDRs describing the Phase 1 upgrades, with the new Pixel system and the HCAL rea...

  5. Mitigating risks related to facilities management.

    Science.gov (United States)

    O'Neill, Daniel P; Scarborough, Sydney

    2013-07-01

    By looking at metrics focusing on the functionality, age, capital investment, transparency, and sustainability (FACTS) of their organizations' facilities, facilities management teams can build potential business cases to justify upgrading the facilities. A FACTS analysis can ensure that capital spent on facilities will produce a higher or more certain ROI than alternatives. A consistent process for managing spending helps to avoid unexpected spikes that cost the enterprise more in the long run.

  6. EUB Decision 2006-112 : Suncor Energy Inc. application for expansion of an oil sands mine (North Steepbank mine extension) and a bitumen upgrading facility (Voyageur Upgrader) in the Fort McMurray area

    International Nuclear Information System (INIS)

    2006-01-01

    Suncor Energy Inc. filed 2 applications to the Alberta Energy and Utilities Board for their proposed North Steepbank Mine Extension and Voyageur Upgrading Facility in the Fort McMurray area. This document provided an outline to the board of the location of the proposed projects, along with technical details concerning sulphur recovery, coke gasification, and by-product storage and use. The applications shared a common environmental impact assessment report, which presented details of tailings management programs; environmental effects to air, terrestrial resources, surface water, and groundwater; potential health effects to human populations; and traditional land use and ecological knowledge of the lands in the areas of the proposed upgrades. The social and economic effects of the projects were considered by the board, as well as the efforts of Suncor to engage with public consultation processes. It was noted that the projects are expected to provide $7.1 billion in federal taxes paid over the life of the project, in addition to $3.6 billion in provincial taxes and a further $23 million in municipal taxes. Details of several interventions filed by various First Nations groups were presented. It was noted that the Oil Sands Environmental Coalition (OSEC) has filed interventions stating concerns over consultation practices; cumulative effects; environmental monitoring; water usage; reclamation policies; and socio-economic issues. Various other groups have expressed concerns over the impacts of rapid development in the region and the subsequent strains on public infrastructure, housing and community resources. While the project is expected to provide employment, the current labour shortage in the region means that further development will be a disadvantage rather than a benefit to the communities in the region. Although a number of conditions were placed on Suncor before full acceptance of the project could be given, the board concluded that the Voyageur project was

  7. Upgrading the standard makeup node at the Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Charvat, L.; Dvorak, J.

    1999-01-01

    Modifications made on the normal makeup and boron control system of the Dukovany nuclear power plant in 1997 and 1998 are described. The reasons for and objectives of the upgrading are highlighted in relation to the reliability of the facility and maintenance cost of the system. (author)

  8. Initial operation of a solar heating and cooling system in a full-scale solar building test facility

    Science.gov (United States)

    Knoll, R. H.; Miao, D.; Hamlet, I. L.; Jensen, R. N.

    1976-01-01

    The Solar Building Test Facility (SBTF) located at Hampton, Virginia became operational in early summer of 1976. This facility is a joint effort by NASA-Lewis and NASA-Langley to advance the technology for heating and cooling of office buildings with solar energy. Its purposes are to (1) test system components which include high-performing collectors, (2) test performance of complete solar heating and cooling system, (3) investigate component interactions and (4) investigate durability, maintenance and reliability of components. The SBTF consists of a 50,000 square foot office building modified to accept solar heated water for operation of an absorption air conditioner and for the baseboard heating system. A 12,666 square foot solar collector field with a 30,000 gallon storage tank provides the solar heated water. A description of the system and the collectors selected is given here, along with the objectives, test approach, expected system performance and some preliminary results.

  9. Bio-Oil Deployment in the Home Heating Market

    Energy Technology Data Exchange (ETDEWEB)

    Butcher, T. A. [Brookhaven National Lab. (BNL), Upton, NY (United States); Trojanowski, R. [Brookhaven National Lab. (BNL), Upton, NY (United States); Mante, O. [Brookhaven National Lab. (BNL), Upton, NY (United States); Wei, G. [Brookhaven National Lab. (BNL), Upton, NY (United States); Celebi, Y. [Brookhaven National Lab. (BNL), Upton, NY (United States); Huber, J. [Brookhaven National Lab. (BNL), Upton, NY (United States)

    2016-07-01

    Distillate fuel oil is used in many stationary heating applications, predominantly in the Northeastern part of the United States. Total estimated non-transportation distillate use in 2014 was estimated to be 10.9 billion gallons. This study has focused on potentially displacing part of this petroleum use with biofuel derived from woody biomass. The fuel production route considered is pyrolysis which creates a liquid fuel high in oxygen, organic acids, and water. While this fuel can be used in stationary applications without significant further processing, to do so would require significant upgrades in current heating equipment. Alternatively this raw pyrolysis oil can be upgraded through catalytic hydrogenation to produce a bio-oil with near-negligible oxygen, water, and acidity. The focus of this work has been exploration of such upgraded fuels. The quality of upgraded fuels is affected by process conditions and there is a cost /quality tradeoff.

  10. Review of the treat upgrade reactor scram system reliability analysis

    International Nuclear Information System (INIS)

    Montague, D.F.; Fussell, J.B.; Krois, P.A.; Morelock, T.C.; Knee, H.E.; Manning, J.J.; Haas, P.M.; West, K.W.

    1984-10-01

    In order to resolve some key LMFBR safety issues, ANL personnel are modifying the TREAT reactor to handle much larger experiments. As a result of these modifications, the upgraded Treat reactor will not always operate in a self-limited mode. During certain experiments in the upgraded TREAT reactor, it is possible that the fuel could be damaged by overheating if, once the computer systems fail, the reactor scram system (RSS) fails on demand. To help ensure that the upgraded TREAT reactor is shut down when required, ANL personnel have designed a triply redundant RSS for the facility. The RSS is designed to meet three reliability goals: (1) a loss of capability failure probability of 10 -9 /demand (independent failures only); (2) an inadvertent shutdown probability of 10 -3 /experiment; and (3) protection agaist any known potential common cause failures. According to ANL's reliability analysis of the RSS, this system substantially meets these goals

  11. Refinancing of the upgrade of heating conversion as a financial instrument used in Bytom community to reduce low emission

    Energy Technology Data Exchange (ETDEWEB)

    Charchula, W.; Wojcik, G.

    1995-12-31

    High concentrations of SO{sub 2}, suspended particulates and benzo-{alpha}-pyrene measured in Bytom town especially during heating season result first of all from the process of coal combustion in households. The analysis of solutions aimed at the reduction of these concentrations was based upon the principles of maximization of the unit effect obtained understood as a cost spent by the town to reduce by a single unit the emission of pollutants into atmospheric air; implementation of tasks consistent to the {open_quotes}company mission{close_quotes} (formally: Master Plan of Environmental Protection for Bytom City) understood as actions aimed at the improvement of living standards of city residents and its value; and minimization of the investment risk under the free market circumstances. These principles resulted in the creation of a local law - Resolution of Bytom City Hall dated April 28, 1994 dealing with refinancing of the upgrade of space heating systems. Thus, as a result of this resolution, it appeared that the residents who implemented the conversion from coal to gas, oil or electricity are authorized to apply for partial refund of capital costs incurred by themselves.

  12. Design Report for the ½ Scale Air-Cooled RCCS Tests in the Natural convection Shutdown heat removal Test Facility (NSTF)

    Energy Technology Data Exchange (ETDEWEB)

    Lisowski, D. D. [Argonne National Lab. (ANL), Argonne, IL (United States); Farmer, M. T. [Argonne National Lab. (ANL), Argonne, IL (United States); Lomperski, S. [Argonne National Lab. (ANL), Argonne, IL (United States); Kilsdonk, D. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Bremer, N. [Argonne National Lab. (ANL), Argonne, IL (United States); Aeschlimann, R. W. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-06-01

    The Natural convection Shutdown heat removal Test Facility (NSTF) is a large scale thermal hydraulics test facility that has been built at Argonne National Laboratory (ANL). The facility was constructed in order to carry out highly instrumented experiments that can be used to validate the performance of passive safety systems for advanced reactor designs. The facility has principally been designed for testing of Reactor Cavity Cooling System (RCCS) concepts that rely on natural convection cooling for either air or water-based systems. Standing 25-m in height, the facility is able to supply up to 220 kW at 21 kW/m2 to accurately simulate the heat fluxes at the walls of a reactor pressure vessel. A suite of nearly 400 data acquisition channels, including a sophisticated fiber optic system for high density temperature measurements, guides test operations and provides data to support scaling analysis and modeling efforts. Measurements of system mass flow rate, air and surface temperatures, heat flux, humidity, and pressure differentials, among others; are part of this total generated data set. The following report provides an introduction to the top level-objectives of the program related to passively safe decay heat removal, a detailed description of the engineering specifications, design features, and dimensions of the test facility at Argonne. Specifications of the sensors and their placement on the test facility will be provided, along with a complete channel listing of the data acquisition system.

  13. Public-Interest Benefit Evaluation of Partial- Upgrading Technology

    Directory of Open Access Journals (Sweden)

    G. Kent Fellows

    2017-01-01

    Full Text Available Approximately 60 per cent of Alberta’s oil sands production is non-upgraded bitumen which, after being mixed with a diluting agent (diluent to allow transport, is exported. A popular view within Alberta — and particularly among Albertan politicians — is that a much larger share of oil sands bitumen should be upgraded in the province. However, without public subsidies or government underwriting, it is uneconomic to build and operate new facilities in Alberta to fully upgrade the bitumen into synthetic crude oil. But there are new partial upgrading technologies being developed that, subject to successful testing at a larger (commercial pilot scale, can prove to be not only economic in Alberta, but also generate large social and economic benefits for the province. The advantages include a much smaller capital investment, a significant increase in the value of the product and market for the product and, even more importantly, a dramatic reduction in the need for large amounts of expensive diluent to transport the product to market. Indeed, the only diluent required will be that to move the bitumen from the production site to the partial upgrader and this can be continually recycled. The market for the synthetic crude oil produced by full upgrading is only getting tougher. Any Alberta bitumen fully upgraded here would compete closely with the rapidly expanding supply of light U.S. unconventional oil. Partial upgrading does not upgrade bitumen to a light crude, but to something resembling more of a medium or heavy crude, and at a lower cost per barrel than full upgrading. Unlike in the increasingly crowded light-crude market, the Alberta Royalty Review Advisory Panel recognized that currently there are gaps in several North American refineries that could be filled by this partially upgraded Alberta oil. A partial upgrader serving that less-competitive market not only appears to hold the potential for investors to make attractive returns in the

  14. Thermohydraulic characteristics analysis of natural convective cooling mode on the steady state condition of upgraded JRR-3 core, using COOLOD-N code

    International Nuclear Information System (INIS)

    Kaminaga, Masanori; Watanabe, Shukichi; Ando, Hiroei; Sudo, Yukio; Ikawa, Hiromasa.

    1987-03-01

    This report describes the results of the steady state thermohydraulic analysis of upgraded JRR-3 core under natural convective cooling mode, using COOLOD-N code. In the code, function to calculate flow-rate under natural convective cooling mode, and a heat transfer package have been newly added to the COOLOD code which has been developed in JAERI. And this report describes outline of the COOLOD-N code. The results of analysis show that the thermohydraulics of upgraded JRR-3 core, under natural convective cooling mode have enough margine to ONB temperature, DNB heat flux and occurance of blisters in fuel meats, which are design criterion of upgraded JRR-3. (author)

  15. A computer model for identifying security system upgrades

    International Nuclear Information System (INIS)

    Lamont, A.

    1988-01-01

    This paper describes a prototype safeguards analysis tool that automatically identifies system weaknesses against an insider adversary and suggest possible upgrades to improve the probability that the adversary will be detected. The tool is based on this premise: as the adversary acts, he or she creates a set of facts that can be detected by safeguards components. Whenever an adversary's planned set of actions create a set of facts which the security personnel would consider irregular or unusual, we can improve the security system by implementing safeguards that detect those facts. Therefore, an intelligent computer program can suggest upgrades to the facility if we construct a knowledge base that contains information about: (1) the facts created by each possible adversary action, (2) the facts that each possible safeguard can detect, and (3) groups of facts which will be considered irregular whenever they occur together. The authors describe the structure of the knowledge base and show how the above information can be represented in it. They also describe the procedures that a computer program can use to identify missing or weak safeguards and to suggest upgrades

  16. Low temperature oxidation and spontaneous combustion characteristics of upgraded low rank coal

    Energy Technology Data Exchange (ETDEWEB)

    Choi, H.K.; Kim, S.D.; Yoo, J.H.; Chun, D.H.; Rhim, Y.J.; Lee, S.H. [Korea Institute of Energy Research, Daejeon (Korea, Republic of)

    2013-07-01

    The low temperature oxidation and spontaneous combustion characteristics of dried coal produced from low rank coal using the upgraded brown coal (UBC) process were investigated. To this end, proximate properties, crossing-point temperature (CPT), and isothermal oxidation characteristics of the coal were analyzed. The isothermal oxidation characteristics were estimated by considering the formation rates of CO and CO{sub 2} at low temperatures. The upgraded low rank coal had higher heating values than the raw coal. It also had less susceptibility to low temperature oxidation and spontaneous combustion. This seemed to result from the coating of the asphalt on the surface of the coal, which suppressed the active functional groups from reacting with oxygen in the air. The increasing upgrading pressure negatively affected the low temperature oxidation and spontaneous combustion.

  17. Finite Element Analysis of High Heat Load Deformation and Mechanical Bending Correction of a Beamline Mirror for the APS Upgrade

    Science.gov (United States)

    Goldring, Nicholas

    The impending Advanced Photon Source Upgrade (APS-U) will introduce a hard x-ray source that is set to surpass the current APS in brightness and coherence by two to three orders of magnitude. To achieve this, the storage ring light source will be equipped with a multi-bend achromat (MBA) lattice. In order to fully exploit and preserve the integrity of new beams actualized by upgraded storage ring components, improved beamline optics must also be introduced. The design process of new optics for the APS-U and other fourth generation synchrotrons involves the challenge of accommodating unprecedented heat loads. This dissertation presents an ex-situ analysis of heat load deformation and the subsequent mechanical bending correction of a 400 mm long, grazing-incidence, H2O side-cooled, reflecting mirror subjected to x-ray beams produced by the APS-U undulator source. Bending correction is measured as the smallest rms slope error, sigmarms, that can be resolved over a given length of the heat deformed geometry due to mechanical bending. Values of sigmarms in the account for finish errors or other contributions to sigmarms beyond the scope of thermal deformation and elastic bending. The methodology of this research includes finite element analysis (FEA) employed conjointly with an analytical solution for mechanical bending deflection by means of an end couple. Additionally, the study will focus on two beam power density profiles predicted by the APS-U which were created using the software SRCalc. The profiles account for a 6 GeV electron beam with second moment widths of 0.058 and 0.011 mm in the x- and y- directions respectively; the electron beam is passed through a 4.8 m long, 28 mm period APS-U undulator which produces the x-ray beam incident at a 3 mrad grazing angle on the flat mirror surface for both cases. The first power density profile is the most extreme case created by the undulator at it's closest gap with a critical energy of 3 keV (k y=2.459); the second

  18. A control system upgrade of the spear synchrotron and injector

    International Nuclear Information System (INIS)

    Garrett, R.; Howry, S.; Wermelskirchen, C.; Yang, J.

    1995-11-01

    The SPEAR electron synchrotron is an old and venerable facility with a history of great physics. When this storage ring was converted to serve as a full-time synchrotron light source, it was evident that the facility was due for an overhaul of its control system. Outdated hardware interfaces, custom operator interfaces, and the control computer itself were replaced with off-the-shelf distributed intelligent controllers and networked X-workstations. However, almost all applications and control functions were retained by simply rewriting the layer of software closest to each new device. The success of this upgrade prompted us to do a similar upgrade of our Injector system. Although the Injector was already running an X-windows based control system, it was non-networked and Q-bus based. By using the same Ethernet based controllers that were used at SPEAR, we were able to integrate the two systems into one that resembles the ''standard model'' for control systems, and at the same time preserve the applications software that has been developed over the years on both systems

  19. Thermal Upgrading of 9977 Radioactive Material (Ram) Type B Package

    International Nuclear Information System (INIS)

    Gupta, N.; Abramczyk, G.

    2012-01-01

    The 9977 package is a radioactive material package that was originally certified to ship Heat Sources and RTG contents up to 19 watts and it is now being reviewed to significantly expand its contents in support of additional DOE missions. Thermal upgrading will be accomplished by employing stacked 3013 containers, a 3013 aluminum spacer and an external aluminum sleeve for enhanced heat transfer. The 7th Addendum to the original 9977 package Safety Basis Report describing these modifications is under review for the DOE certification. The analyses described in this paper show that this well-designed and conservatively analyzed package can be upgraded to carry contents with decay heat up to 38 watts with some simple design modifications. The Model 9977 package has been designed as a replacement for the Department of Transportation (DOT) Fissile Specification 6M package. The 9977 package is a very versatile Type B package which is certified to transport and store a wide spectrum of radioactive materials. The package was analyzed quite conservatively to increase its usefulness and store different payload configurations. Its versatility is evident from several daughter packages such as the 9978 and H1700, and several addendums where the payloads have been modified to suit the Shipper's needs without additional testing.

  20. ECRH experiments in ASDEX Upgrade

    International Nuclear Information System (INIS)

    Leuterer, F.; Guenter, S.; Hobirk, J.; Kirov, K.; Ryter, F.; Wolf, R.; Zohm, H.; Gantenbein, G.

    2001-01-01

    In ASDEX Upgrade ECRH and ECCD with a power of up to 2 MW has been used. With counter ECCD in discharges with an internal transport barrier we achieved an electron temperature of ≅13 keV. In low density ohmic plasmas we obtained an rf driven current of ≅80% both in co- and counter directions. Neoclassical tearing modes have been completly stabilised by driving a current on the resonant q-surface. Electron heat transport has been studied in standard L- and H-mode plasmas and can be described by a dependence on a critical electron temperature gradient

  1. Shear and Thermal Testing of Adhesives for VELO Upgrade

    CERN Document Server

    De Capua, Stefano; Klaver, Suzanne; Parkes, Chris; Rodriguez Perez, Pablo; Shtipliyski, Antoni; Stelmasiak, Guy James

    2016-01-01

    As part of the R&D process of the LHCb VELO Upgrade, a study has been performed on the thermal and mechanical performance of the adhesives Stycast 2850FT, 3M 9461P, and Araldite 2011. One or more of these adhesives could be used to attach the ASICs and hybrids to the microchannel cooling substrate. Samples were irradiated at up to the maximum dose expected at the upgrade. Shear tests of the samples were made and a suitable performance obtained from all glues. Some failures were encountered with Stycast 2850FT glued samples and this is attributed to the sample preparation. The relative thermal conductivities of the adhesives were also determined by measuring the relative temperature difference across a glued joint while one side is heated.

  2. Water demand characteristics of shared water and sanitation facilities

    African Journals Online (AJOL)

    The provision of communal water and sanitation facilities has been mandated by the South African Government as an interim measure for informal settlement upgrading. These services form the first step in the upgrading process and are essential in meeting the basic needs of the community. The eThekwini municipality is ...

  3. Measurements of radial profiles of ion cyclotron resonance heating on the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Falabella, S.

    1988-01-01

    A small Radial Energy Analyzer (REA) was used on the Tandem Mirror Experiment-Upgrade (TMX-U), at Lawerence Livermore National Laboratory, to investigate the radial profiles of ion temperature, density, and plasma potential during Ion Cyclotron Resonance Heating (ICRH). The probe has been inserted into the central-cell plasma at temperatures of 200 eV and densities of 3 x 10 12 cm/sup /minus 3// without damage to the probe, or major degradation of the plasma. This analyzer has indicated an increase in ion temperature from near 20 eV before ICRH to near 150 eV during ICRH, with about 60 kW of broadcast power. The REA measurements were cross-checked against other diagnostics on TMX-U and found to be consistent. The ion density measurement was compared to the line-density measured by microwave interferometry and found to agree within 10 to 20%. A radial intergral of n/sub i/T/sub i/ as measured by the REA shows good agreement with the diamagnetic loop measurement of plasma energy. The radial density profile is observed to broaden during the RF heating pulses, without inducing additional radial losses in the core plasma. The radial profile of plasma is seen to vary from axially peaked, to nearly flat as the plasma conditions carried over the series of experiments. To relate the increase in ion temperature to power absorbed by the plasma, a power balance as a function of radius was performed. The RF power absorbed is set equal to the sum of the losses during ICRH, minus those without ICRH. This method accounts for more than 70% of the broadcast power using a simple power balance model. The measured radial profile of the RF heating was compared to the calculations of two codes, ANTENA and GARFIELD, to test their effectiveness as predictors of power absorption profiles for TMX-U. 62 refs., 63 figs., 7 tabs

  4. Measurements of radial profiles of ion cyclotron resonance heating on the Tandem Mirror Experiment-Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Falabella, S.

    1988-05-11

    A small Radial Energy Analyzer (REA) was used on the Tandem Mirror Experiment-Upgrade (TMX-U), at Lawerence Livermore National Laboratory, to investigate the radial profiles of ion temperature, density, and plasma potential during Ion Cyclotron Resonance Heating (ICRH). The probe has been inserted into the central-cell plasma at temperatures of 200 eV and densities of 3 x 10/sup 12/cm/sup /minus 3// without damage to the probe, or major degradation of the plasma. This analyzer has indicated an increase in ion temperature from near 20 eV before ICRH to near 150 eV during ICRH, with about 60 kW of broadcast power. The REA measurements were cross-checked against other diagnostics on TMX-U and found to be consistent. The ion density measurement was compared to the line-density measured by microwave interferometry and found to agree within 10 to 20%. A radial intergral of n/sub i/T/sub i/ as measured by the REA shows good agreement with the diamagnetic loop measurement of plasma energy. The radial density profile is observed to broaden during the RF heating pulses, without inducing additional radial losses in the core plasma. The radial profile of plasma is seen to vary from axially peaked, to nearly flat as the plasma conditions carried over the series of experiments. To relate the increase in ion temperature to power absorbed by the plasma, a power balance as a function of radius was performed. The RF power absorbed is set equal to the sum of the losses during ICRH, minus those without ICRH. This method accounts for more than 70% of the broadcast power using a simple power balance model. The measured radial profile of the RF heating was compared to the calculations of two codes, ANTENA and GARFIELD, to test their effectiveness as predictors of power absorption profiles for TMX-U. 62 refs., 63 figs., 7 tabs.

  5. Development of AR/VR Capabilities for Facility and Mission Support

    Data.gov (United States)

    National Aeronautics and Space Administration — Currently challenges in facility maintenance and in implementing facility modifications/upgrades (e.g., rocket engine test stands) can be found in gaps in fully...

  6. MPC and A upgrades at the Institute of Theoretical and Experimental Physics (ITEP)

    International Nuclear Information System (INIS)

    Haase, M.; Smarto, C.; Baumann, M.

    1998-01-01

    Materials Protection, Control and Accounting (MPC and A) equipment upgrades are complete at the Institute of Theoretical and Experimental Physics (ITEP), a site that has significant quantities of weapons-potential nuclear materials. Cooperative work was initiated at this Moscow facility as a part of the US-Russian program to upgrade MPC and A systems. An initial site visit and assessment were conducted in September 1996 to establish communication between ITEP, the US Department of Energy (DOE), and participating US National Laboratories. Subsequently, an agreement was reached to develop two master plans for MPC and A upgrades. Los Alamos National Laboratory (LANL) and Oak Ridge National Laboratory (ORNL) assisted in developing a plan for Material Control and Accounting (MC and A) upgrades, and Sandia National Laboratories (SNL) assisted in developing a plan for Physical Protection System (PPS) upgrades. The MC and A plan included MC and A training, a mass measurement program, nondestructive assay instrumentation, item identification (bar coding), physical inventory taking, portal and hand-held nuclear material monitors, and a nuclear materials accounting system. The PPS plan included basic PPS design training, Central Alarm Station (CAS) relocation and equipment upgrades, a site and critical-building access control system, intrusion detection, alarm assessment, and guard force communications

  7. Analysis of removal of residual decay heat from interim storage facilities by means of the CFD program FLUENT

    International Nuclear Information System (INIS)

    Stratmann, W.; Hages, P.

    2004-01-01

    Within the scope of nuclear licensing procedures of on-site interim storage facilities for dual purpose casks it is necessary, among other things, to provide proof of sufficient removal of the residual decay heat emitted by the casks. The results of the analyses performed for this purpose define e.g. the boundary conditions for further thermal analyses regarding the permissible cask component temperatures or the maximum permissible temperatures of the fuel cladding tubes of the fuel elements stored in the casks. Up to now, for the centralized interim storage facilities in Germany such analyses were performed on the basis of experimental investigations using scaled-down storage geometries. In the engineering phase of the Lingen on-site interim storage facility, proof was furnished for the first time using the CFD (computational fluid dynamics) program FLUENT. The program FLUENT is an internationally recognized and comprehensively verified program for the calculation of flow and heat transport processes. Starting from a brief discussion of modeling and the different boundary conditions of the computation, this contribution presents various results regarding the temperatures of air, cask surfaces and storage facility components, the mass flows through the storage facility and the heat transfer at the cask surface. The interface point to the cask-specific analyses is defined to be the cask surface

  8. Performance of the first ASDEX Upgrade neutral beam injector

    International Nuclear Information System (INIS)

    Staebler, A.; Vollmer, O.; Feist, J.H.; Speth, E.; Heinemann, B.; Melkus, W.; Obermayer, S.; Riedl, R.; Schaerich, W.; Wittenbecher, K.

    1995-01-01

    Plasmas of the ASDEX Upgrade tokamak have been heated with H 0 beams of up to 7 MW and D 0 beams of up to 10 MW. Beam modulation allows to inject at any power level between zero and full power. Measurements characterizing the NBI system performance, the power accountability, and the operational experience obtained so far are discussed. (orig.)

  9. Upgrade of the GSI-Unilac as a FAIR high current injector

    Energy Technology Data Exchange (ETDEWEB)

    Haehnel, Hendrik [Institut fuer Angewandte Physik, Goethe Universitaet Frankfurt (Germany)

    2016-07-01

    The existing UNIversal Linear Accelerator (UNILAC) at GSI will serve as ion and dedicated uranium ion injector for the Facility for Antiproton and Ion Research (FAIR). For nominal FAIR operation, 15 emA of Uranium 28+ at low emittances have to be injected by multiturn-injection into FAIR. To meet these requirements and to ensure reliable operation, the UNILAC will undergo a significant upgrade process. Upgrade measures concerning key accelerator components are described and a main focus is put on a replacement of the 54m Alvarez-section by a compact IH-DTL. This will open new options for future injection schemes into SIS100.

  10. X-ray imaging studies of electron cyclotron microwave-heated plasmas in the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Failor, B.H.

    1986-02-01

    An x-ray pinhole camera designed to efficiently detect photons with energies between 5 and 250 keV was built to image bremsstrahlung emission from a microwave-heated hot electron plasma. This plasma is formed at one of the thermal barrier locations in the Tandem Experiment-Upgrade at Lawrence Livermore National Laboratory. The instrument consists of a lead aperture, an x-ray converter in the form of a sodium-activated cesium iodide scintillator, light intensifier electronics, and a recording medium that may either be high speed film or a CCD array. The nominal spatial and temporal resolutions are one part in 40 and 17 msec, respectively. The component requirements for optimum performance were determined both analytically and by computer simulation, and were verified experimentally. The details of these results are presented. The instrument has been used to measure x-ray emission from the TMX-U west end cell. Data acquired with the x-ray camera has allowed us to infer the temporal evolution of the mirror-trapped electron radial profile

  11. Ion Cyclotron Resonant Heating 2 X 1700 loop antenna for the Tandem Mirror Experiment-Upgrade

    International Nuclear Information System (INIS)

    Brooksby, C.A.; Ferguson, S.W.; Molvik, A.W.; Barter, J.

    1986-01-01

    This paper reviews the mechanical design and improvements that have taken place on the loop type ion cyclotron resonance heating (ICRH) antennas that are located in the center cell region of the Tandem Mirror Experiment-Upgrade (TMX-U). A computer code (JASON) was used to design getter-shielded antenna supports that will hold off very high voltages (83 kV, DC) over a small insulator distance (2.25 inches) in a vacuum of 10/sup -5/ Torr. The authors also added corona shields on the ceramic-to-metal joints of the matching network capacitors. The system now operates reliably with peak radio frequency (RF) voltages of 40 kV at 2-to-4- MHz frequency and power levels up to 200 kW. The authors have just installed a new loop antenna in the east part of the central cell where the slot antenna was located. This antenna uses two of the slot's internal coax lines and the external matching network. The feedthroughs designed by Lawrence Livermore National Laboratory (LLNL) were replaced with two high-voltage RF feedthroughs designed by Oak Ridge National Laboratory (ORNL)

  12. Modeling of Heat Transfer in the Helical-Coil Heat Exchanger for the Reactor Facility "UNITERM"

    Directory of Open Access Journals (Sweden)

    V. I. Solonin

    2014-01-01

    Full Text Available Circuit heat sink plays an important role in the reactor system. Therefore it imposes high requirements for quality of determining thermal-hydraulic parameters. This article is aimed at modeling of heat exchange process of the helical-coil heat exchanger, which is part of the heat sink circuit of the reactor facility "UNITERM."The simulation was performed using hydro-gas-dynamic software package ANSYS CFX. Computational fluid dynamics of this package allows us to perform calculations in a threedimensional setting, giving an idea of the fluid flow nature. The purpose of the simulation was to determine the parameters of the helical-coil heat exchanger (temperature, velocity at the outlet of the pipe and inter-tubular space, pressure drop, and the nature of the fluid flow of primary and intermediate coolants. Geometric parameters of the model were determined using the preliminary calculations performed by the criterion equations. In calculations Turbulence models k-ε RNG, Shear Stress Transport (SST are used. The article describes selected turbulence models, and considers relationship with wall function.The calculation results allow us to give the values obtained for thermal-hydraulic parameters, to compare selected turbulence models, as well as to show distribution patterns of the coolant temperature, pressure, and velocity at the outlet of the intermediate cooler.Calculations have shown that:- maximum values of primary coolant temperature at the outlet of the heat exchanger surface are encountered in the space between the helical-coil tubes;- higher temperatures of intermediate coolant at the outlet of the coils (in space of helicalcoil tubes are observed for the peripheral row;- primary coolant movement in the inter-tubular space of helical-coil surface is formed as a spiral flow, rather than as a in-line tube bank cross flow.

  13. Empiricial scaling of inter-ELM power widths in ASDEX Upgrade and JET

    Energy Technology Data Exchange (ETDEWEB)

    Eich, T., E-mail: teich@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, D-85748 Garching (Germany); Sieglin, B.; Scarabosio, A.; Herrmann, A.; Kallenbach, A. [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, D-85748 Garching (Germany); Matthews, G.F. [EURATOM/CCFE Association, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Jachmich, S. [ERM-KMS, EURATOM Association, Brussels (Belgium); Brezinsek, S.; Rack, M. [IEK-4, Forschungszentrum Jülich, EURATOM Association (Germany); Goldston, R.J. [Princeton Plasma Physics Labaratory, Princeton, NJ 08543 (United States)

    2013-07-15

    The SOL power decay length (λ{sub q}) deduced from analysis of fully attached divertor heat load profiles from two tokamaks, JET and ASDEX Upgrade with carbon plasma facing components, are presented. Interpretation of the target heat load profiles is performed by using a 1D-fit function which disentangles the upstream λ{sub q} and an effective diffusion in the divertor (S), the latter essentially acting as a power spreading parameter in the divertor volume. It is shown that the so called integral decay length λ{sub int} is approximately given by λ{sub int}≈λ{sub q}+1.64×S. An empirical scaling reveals parametric dependency λ{sub q}/mm≃0.9·B{sub T}{sup -0.7}q{sub cyl}{sup 1.2}P{sub SOL}{sup 0}R{sub geo}{sup 0} for type-I ELMy H-modes. Extrapolation to ITER gives λ{sub q}≃1 mm. Recent measurements in JET-ILW and from ASDEX Upgrade full-W confirm the results. It is shown that a regression for the divertor power spreading parameter S is not yet possible due to the large effect of different divertor geometries of JET and ASDEX Upgrade Divertor-I and Divertor-IIb.

  14. The conversion of a room temperature NaK loop to a high temperature MHD facility for Li/V blanket testing

    International Nuclear Information System (INIS)

    Reed, C.B.; Haglund, R.C.; Miller, M.E.; Nasiatka, J.R.; Kirillov, I.R.; Ogorodnikov, A.P.; Preslitski, G.V.; Goloubovitch, G.P.; Xu, Zeng Yu

    1996-01-01

    The Vanadium/Lithium system has been the recent focus of ANL's Blanket Technology Pro-ram, and for the last several years, ANL's Liquid Metal Blanket activities have been carried out in direct support of the ITER (International Thermonuclear Experimental Reactor) breeding blanket task area. A key feasibility issue for the ITER Vanadium/Lithium breeding blanket is the Near the development of insulator coatings. Design calculations, Hua and Gohar, show that an electrically insulating layer is necessary to maintain an acceptably low magneto-hydrodynamic (MHD) pressure drop in the current ITER design. Consequently, the decision was made to convert Argonne's Liquid Metal EXperiment (ALEX) from a 200 degrees C NaK facility to a 350 degrees C lithium facility. The upgraded facility was designed to produce MHD pressure drop data, test section voltage distributions, and heat transfer data for mid-scale test sections and blanket mockups at Hartmann numbers (M) and interaction parameters (N) in the range of 10 3 to 10 5 in lithium at 350 degrees C. Following completion of the upgrade work, a short performance test was conducted, followed by two longer multiple-hour, MHD tests, all at 230 degrees C. The modified ALEX facility performed up to expectations in the testing. MHD pressure drop and test section voltage distributions were collected at Hartmann numbers of 1000

  15. Upgrades toward high-heat flux, liquid lithium plasma-facing components in the NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Jaworski, M.A., E-mail: mjaworsk@pppl.gov [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Brooks, A.; Kaita, R. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Lopes-Cardozo, N. [TU/Eindhoven, Eindhoven (Netherlands); Menard, J.; Ono, M. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Rindt, P. [TU/Eindhoven, Eindhoven (Netherlands); Tresemer, K. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States)

    2016-11-15

    Highlights: • An upgrade path for the NSTX-U tokamak is proposed that maintains scientific productivity while enabling exploration of novel, liquid metal PFC. • Pre-filled liquid metal divertor targets are proposed as an intermediate step that mitigates technical and scientific risks associated with liquid metal PFC. • Analysis of leading edge features show a strong link between engineering design considerations and expected performance as a PFC. • A method for optimizing porous liquid metal targets restrained by capillary forces is provided indicating pore-sizes well within current technical capabilities. - Abstract: Liquid metal plasma-facing components (PFCs) provide numerous potential advantages over solid-material components. One critique of the approach is the relatively less developed technologies associated with deploying these components in a fusion plasma-experiment. Exploration of the temperature limits of liquid lithium PFCs in a tokamak divertor and the corresponding consequences on core operation are a high priority informing the possibilities for future liquid lithium PFCs. An all-metal NSTX-U is envisioned to make direct comparison between all high-Z wall operation and liquid lithium PFCs in a single device. By executing the all-metal upgrades incrementally, scientific productivity will be maintained while enabling physics and engineering-science studies to further develop the solid- and liquid-metal components. Six major elements of a flowing liquid-metal divertor system are described and a three-step program for implementing this system is laid out. The upgrade steps involve the first high-Z divertor target upgrade in NSTX-U, pre-filled liquid metal targets and finally, an integrated, flowing liquid metal divertor target. Two example issues are described where the engineering and physics experiments are shown to be closely related in examining the prospects for future liquid metal PFCs.

  16. Heat Transfer Analysis of the European Pressurized Water Reactor (EPR) Core Catcher Test Facility Volley

    Energy Technology Data Exchange (ETDEWEB)

    Pikkarainen, Mika; Laine, Jani; Purhonen, Heikki; Kyrki-Rajamaeki, Riitta [Lappeenranta University of Technology, P.O. 20 53851 Lappeenranta (Finland); Sairanen, Risto [Radiation and Nuclear Safety Authority, P.O. 14 00881 Helsinki (Finland)

    2008-07-01

    The EPR is designed to cope with severe accidents, involving core meltdown. A specific melt spreading area has been designed within the containment. This core catcher will be flooded by water, which transfers the decay heat to the containment heat removal system. To improve cooling, horizontal flow channels made of cast iron are located also below the core catcher. STUK, the radiation and nuclear safety authority in Finland, wanted an independent study of the functionality of the core catcher design. Effect of the presence of insulation material and boric acid in the cooling water was to be studied, as well as the general behavior of the system in different phases of the flooding of the core melt spreading area. To verify the function of the core catcher design, a scaled down test facility was built at Lappeenranta University of Technology. Since there are some physical restrictions of a test facility computational tools were applied especially for the tests where steady state conditions could not be reached without endangering the integrity of the test facility. This paper introduces the Volley test facility, computational simulations and compares them with the test results. Simulated temperatures of those Volley tests, which could be run until steady state conditions, are very close to the measured temperatures. It can be concluded also, that the temperatures are evidently below the cast iron melting point with heat fluxes used in the tests, if there is a small flow inside the cooling channels or even in case when only a few adjacent cooling channels are totally dry. (authors)

  17. Heat Transfer Analysis of the European Pressurized Water Reactor (EPR) Core Catcher Test Facility Volley

    International Nuclear Information System (INIS)

    Pikkarainen, Mika; Laine, Jani; Purhonen, Heikki; Kyrki-Rajamaeki, Riitta; Sairanen, Risto

    2008-01-01

    The EPR is designed to cope with severe accidents, involving core meltdown. A specific melt spreading area has been designed within the containment. This core catcher will be flooded by water, which transfers the decay heat to the containment heat removal system. To improve cooling, horizontal flow channels made of cast iron are located also below the core catcher. STUK, the radiation and nuclear safety authority in Finland, wanted an independent study of the functionality of the core catcher design. Effect of the presence of insulation material and boric acid in the cooling water was to be studied, as well as the general behavior of the system in different phases of the flooding of the core melt spreading area. To verify the function of the core catcher design, a scaled down test facility was built at Lappeenranta University of Technology. Since there are some physical restrictions of a test facility computational tools were applied especially for the tests where steady state conditions could not be reached without endangering the integrity of the test facility. This paper introduces the Volley test facility, computational simulations and compares them with the test results. Simulated temperatures of those Volley tests, which could be run until steady state conditions, are very close to the measured temperatures. It can be concluded also, that the temperatures are evidently below the cast iron melting point with heat fluxes used in the tests, if there is a small flow inside the cooling channels or even in case when only a few adjacent cooling channels are totally dry. (authors)

  18. Ion heat transport studies in JET

    DEFF Research Database (Denmark)

    Mantica, P; Angioni, C; Baiocchi, B

    2011-01-01

    Detailed experimental studies of ion heat transport have been carried out in JET exploiting the upgrade of active charge exchange spectroscopy and the availability of multi-frequency ion cyclotron resonance heating with 3He minority. The determination of ion temperature gradient (ITG) threshold a...

  19. Development of Regulatory Documents for Creation (Upgrade) of Physical Protection Systems under the Russian/American MPC and A Program

    International Nuclear Information System (INIS)

    Izmaylov, Alexandr V.; Babkin, Vladimir; Kurov, Valeriy; Piskarev, Alexander; O'Brien, Patricia E.; Wright, Troy L.; Schlegel, Stephen C.; Hazel, Michael J.; Miller, Daniel R.; Tuttle, John D.; Kovchegin, Dmitry

    2009-01-01

    The development of new or the upgrade of existing physical protection systems (PPS) for nuclear facilities involves a multi-step and multidimensional process. The process consists of conceptual design, design, and commissioning stages. The activities associated with each of these stages are governed by Russian government and agency regulations. To ensure a uniform approach to development or upgrading of PPS at Russian nuclear facilities, the development of a range of regulatory and methodological documents is necessary. Some issues of PPS development are covered by the regulatory documents developed by Rosatom, as well as other Russian agencies with nuclear facilities under their control. This regulatory development has been accomplished as part of the U.S.-Russian MPC and A cooperation or independently by the Russian Federation. While regulatory coverage is extensive, there are a number of issues such as vulnerability analysis, effectiveness assessment, upgrading PPS, and protection of information systems for PPS that require additional regulations be developed. This paper reports on the status of regulatory coverage for PPS development or upgrade, and outlines a new approach to regulatory document development. It describes the evolutionary process of regulatory development through experience gained in the design, development and implementation of PPS as well as experience gained through the cooperative efforts of Russian and U.S. experts involved the development of MPC and A regulations.

  20. Optimization of the RF cavity heat load and trip rates for CEBAF at 12 GeV

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, He [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Roblin, Yves R. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Freyberger, Arne P. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Krafft, Geoffrey A. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Terzic, Balsa P. [Old Dominion Univ., Norfolk, VA (United States)

    2017-05-01

    The Continuous Electron Beam Accelerator Facility at JLab has 200 RF cavities in the north linac and the south linac respectively after the 12 GeV upgrade. The purpose of this work is to simultaneously optimize the heat load and the trip rate for the cavities and to reconstruct the pareto-optimal front in a timely manner when some of the cavities are turned down. By choosing an efficient optimizer and strategically creating the initial gradients, the pareto-optimal front for no more than 15 cavities down can be re-established within 20 seconds.

  1. Technical evaluation report of the Fort St. Vrain final draft upgraded technical specifications

    International Nuclear Information System (INIS)

    Kimura, C.Y.

    1989-01-01

    This report is a technical evaluation of the final draft of the Fort St. Vrain (FSV) Upgraded Technical Specifications (UT/S) as issued by Public Service of Colorado (PSC) on May 27, 1988 with subsequent supplemental updates issued on June 15, 1988 and August 5, 1988. It has been compared for consistency, and safety conservatism with the Fort St. Vrain (FSV) Updated Final Safety Analysis Report (FSAR), the FSV Safety Evaluation Report (SER), the Facility Operating License, DPR-34, and all amendments to the Facility Operating License issued as of June 1, 1988, and Appendix A to the Operating License DPR-34, Technical Specifications. Because of the age of the plant, no supplements to the Fort St. Vrain SER have been issued since the original SER was not issued as a WASH or a NUREG report. This made it necessary to review all amendments to the Facility Operating License since they would contain the safety evaluations done to support changes to the Facility Operating License. The upgraded Fort St. Vrain Technical Specifications were also broadly compared with the latest Westinghouse Standard Technical Specifications (WSTS) to assure that what was proposed for Fort St. Vrain was consistent with the latest NRC staff practices for standard technical specifications

  2. Upgrade of ATLAS-ALFA for Run2

    CERN Document Server

    Jakobsen, Sune; The ATLAS collaboration

    2016-01-01

    Early experience with the operation of the ALFA detectors in the LHC environment has shown significant beam-induced heating. Comprehensive studies on the effects of heating with a spare detector module have furthermore revealed that heating effects could be disastrous in the case of the larger beam intensities foreseen for higher luminosity. A temporary solution was implemented and kept the detectors below the critical temperature in 2012. In LS1 all ALFA stations have been removed from LHC and are undergoing an upgrade of the geometry of Roman Pots to minimize the impedance losses. When the stations were re-installed ~4 m distance was added between them to gain level arm in the angular measurement between the stations. The updated geometry of the Roman Pot, together with a system to improve the internal heat transfer and an air cooling system, is expected to keep the temperatures of ALFA detectors below critical limits throughout the LHC Run2 and first results from the performance in 2016 will be presented. ...

  3. Influence of condensation on heat flux and pressure measurements in a detonation-based short-duration facility

    Science.gov (United States)

    Haase, S.; Olivier, H.

    2017-10-01

    Detonation-based short-duration facilities provide hot gas with very high stagnation pressures and temperatures. Due to the short testing time, complex and expensive cooling techniques of the facility walls are not needed. Therefore, they are attractive for economical experimental investigations of high-enthalpy flows such as the flow in a rocket engine. However, cold walls can provoke condensation of the hot combustion gas at the walls. This has already been observed in detonation tubes close behind the detonation wave, resulting in a loss of tube performance. A potential influence of condensation at the wall on the experimental results, like wall heat fluxes and static pressures, has not been considered so far. Therefore, in this study the occurrence of condensation and its influence on local heat flux and pressure measurements has been investigated in the nozzle test section of a short-duration rocket-engine simulation facility. This facility provides hot water vapor with stagnation pressures up to 150 bar and stagnation temperatures up to 3800 K. A simple method has been developed to detect liquid water at the wall without direct optical access to the flow. It is shown experimentally and theoretically that condensation has a remarkable influence on local measurement values. The experimental results indicate that for the elimination of these influences the nozzle wall has to be heated to a certain temperature level, which exclusively depends on the local static pressure.

  4. Operational present status and reliability analysis of the upgraded EAST cryogenic system

    Science.gov (United States)

    Zhou, Z. W.; Y Zhang, Q.; Lu, X. F.; Hu, L. B.; Zhu, P.

    2017-12-01

    Since the first commissioning in 2005, the cryogenic system for EAST (Experimental Advanced Superconducting Tokamak) has been cooled down and warmed up for thirteen experimental campaigns. In order to promote the refrigeration efficiencies and reliability, the EAST cryogenic system was upgraded gradually with new helium screw compressors and new dynamic gas bearing helium turbine expanders with eddy current brake to improve the original poor mechanical and operational performance from 2012 to 2015. Then the totally upgraded cryogenic system was put into operation in the eleventh cool-down experiment, and has been operated for the latest several experimental campaigns. The upgraded system has successfully coped with various normal operational modes during cool-down and 4.5 K steady-state operation under pulsed heat load from the tokamak as well as the abnormal fault modes including turbines protection stop. In this paper, the upgraded EAST cryogenic system including its functional analysis and new cryogenic control networks will be presented in detail. Also, its operational present status in the latest cool-down experiments will be presented and the system reliability will be analyzed, which shows a high reliability and low fault rate after upgrade. In the end, some future necessary work to meet the higher reliability requirement for future uninterrupted long-term experimental operation will also be proposed.

  5. Performing instrumentation and controls upgrades

    International Nuclear Information System (INIS)

    Kessler, F. M.; Connell, T. J.; Ryan, M. P.

    1992-01-01

    I and C upgrades are comprised of a varying range of content, complexity, expansiveness, and criticality. There are common threads in all upgrades which can be simplified by the development of a long term I and C upgrade plan. The development of a such a plan can establish effective ground rules for upgrades, large and small. It can be the basis from which to begin an upgrade evaluation and the standard which is used to compare the degree of compliance of any upgrade regarding the plan or to define the differences from the plan and an individual upgrade. Primary motivation for I and C upgrades are obsolescence and unavailability of spare parts. Numerous other areas of consideration are also involved in an upgrade. Today's technology results in most upgrades largely or totally utilizing digital equipment. The use of digital equipment is fairly new in many I and C applications and requires an elaborate evaluation from functional, qualification, operational, and licensing perspectives as well as others. A well defined upgrade plan developed as a basis for I and C upgrades is a significant start to ensuring an effective upgrade process. Properly developed and implemented, the plan will support I and C upgrade efforts to ensure that the intricacies associated with such tasks eliminate the existing problems which require the upgrade to be performed. The upgrade plan also results in ensuring the maximum benefit from all perspectives of the plant enhancements being carried out and considered for future implementation. Instrumentation and controls aging and replacement are issues of growing importance due to the potential for significant impact on plant operation and efficiency. Obsolescence and unavailability of spare parts are major drivers towards evaluating the cost benefits of upgrading current equipment. In addition to these two primary factors, the advantages of utilizing digital equipment have also become of prime importance when evaluating instrumentation and

  6. The capabilities of monochromatic EC neutrino beams with the SPS upgrade

    International Nuclear Information System (INIS)

    Espinoza, C; Bernabeu, J

    2008-01-01

    The goal for future neutrino facilities is the determination of the U(e3) mixing and CP violation in neutrino oscillations. This will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We conclude that the SPS upgrade to 1000 GeV is crucial to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline. We compare the physics potential for two different configurations: I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. The main conclusion is that, whereas the gain in the determination of U(e3) is rather modest, setup II provides much better sensitivity to CP violation

  7. The capabilities of monochromatic EC neutrino beams with the SPS upgrade

    Science.gov (United States)

    Espinoza, C.; Bernabéu, J.

    2008-05-01

    The goal for future neutrino facilities is the determination of the U(e3) mixing and CP violation in neutrino oscillations. This will require precision experiments with a very intense neutrino source and energy control. With this objective in mind, the creation of monochromatic neutrino beams from the electron capture decay of boosted ions by the SPS of CERN has been proposed. We discuss the capabilities of such a facility as a function of the energy of the boost and the baseline for the detector. We conclude that the SPS upgrade to 1000 GeV is crucial to reach a better sensitivity to CP violation iff it is accompanied by a longer baseline. We compare the physics potential for two different configurations: I) γ = 90 and γ = 195 (maximum achievable at present SPS) to Frejus; II) γ = 195 and γ = 440 (maximum achievable at upgraded SPS) to Canfranc. The main conclusion is that, whereas the gain in the determination of U(e3) is rather modest, setup II provides much better sensitivity to CP violation.

  8. Tritium processing tests for the validation of upgraded PERMCAT mechanical design

    Energy Technology Data Exchange (ETDEWEB)

    Demange, D.; Glugla, M.; Guenther, K.; Le, T. L.; Simon, K. H.; Wagner, R.; Welte, S. [Forschungszentrum Karlsruhe GmbH, Institue for Technical Physics, Tritium Laboratory Karlsruhe, P.O Box 36 40, D-76021 Karlsruhe (Germany)

    2008-07-15

    The PERMCAT process, chosen for the final clean-up stage of the Tritium Exhaust Processing system in ITER, directly combines a Pd/Ag membrane and a catalyst bed for the detritiation of gaseous mixtures containing molecular and chemically bound tritium. Upgraded PERMCAT mechanical designs have been proposed to both increase the robustness and simplify the design of the reactor. One uses a special corrugated Pd/Ag membrane able to withstand change in length of the membrane during both normal operation and in the case of off-normal events. Based on this design, an upgraded PERMCAT reactor has been produced at FZK and successfully tested at TLK with ITER relevant tritiated gaseous mixtures using the CAPER facility. (authors)

  9. Tritium processing tests for the validation of upgraded PERMCAT mechanical design

    International Nuclear Information System (INIS)

    Demange, D.; Glugla, M.; Guenther, K.; Le, T. L.; Simon, K. H.; Wagner, R.; Welte, S.

    2008-01-01

    The PERMCAT process, chosen for the final clean-up stage of the Tritium Exhaust Processing system in ITER, directly combines a Pd/Ag membrane and a catalyst bed for the detritiation of gaseous mixtures containing molecular and chemically bound tritium. Upgraded PERMCAT mechanical designs have been proposed to both increase the robustness and simplify the design of the reactor. One uses a special corrugated Pd/Ag membrane able to withstand change in length of the membrane during both normal operation and in the case of off-normal events. Based on this design, an upgraded PERMCAT reactor has been produced at FZK and successfully tested at TLK with ITER relevant tritiated gaseous mixtures using the CAPER facility. (authors)

  10. ''Big Dee'' upgrade of the Doublet III diagnostic data acquisition computer system

    International Nuclear Information System (INIS)

    Mcharg, B.B.

    1983-01-01

    The ''Big Dee'' upgrade of the Doublet III tokamak facility will begin operation in 1986 with an initial quantity of data expected to be 10 megabytes per shot and eventually attaining 20-25 megabytes per shot. This is in comparison to the 4-5 megabytes of data currently acquired. To handle this greater quantity of data and to serve physics needs for significantly improved between-shot processing of data will require a substantial upgrade of the existing data acquisition system. The key points of the philosophy that have been adopted for the upgraded system to handle the greater quantity of data are (1) preserve existing hardware, (2) preserve existing software; (3) configure the system in a modular fashion; and (4) distribute the data acquisition over multiple computers. The existing system using ModComp CLASSIC 16 bit minicomputers is capable of handling 5 megabytes of data per shot

  11. Big Dee upgrade of the Doublet III diagnostic data acquisition computer system

    International Nuclear Information System (INIS)

    McHarg, B.B. Jr.

    1983-12-01

    The Big Dee upgrade of the Doublet III tokamak facility will begin operation in 1986 with an initial quantity of data expected to be 10 megabytes per shot and eventually attaining 20 to 25 megabytes per shot. This is in comparison to the 4 to 5 megabytes of data currently acquired. To handle this greater quantity of data and to serve physics needs for significantly improved between-shot processing of data will require a substantial upgrade of the existing data acquisition system. The key points of the philosophy that have been adopted for the upgraded system to handle the greater quantity of data are (1) preserve existing hardware; (2) preserve existing software; (3) configure the system in a modular fashion; and (4) distribute the data acquisition over multiple computers. The existing system using ModComp CLASSIC 16 bit minicomputers is capable of handling 5 megabytes of data per shot

  12. Elliptical superconducting RF cavities for FRIB energy upgrade

    Science.gov (United States)

    Ostroumov, P. N.; Contreras, C.; Plastun, A. S.; Rathke, J.; Schultheiss, T.; Taylor, A.; Wei, J.; Xu, M.; Xu, T.; Zhao, Q.; Gonin, I. V.; Khabiboulline, T.; Pischalnikov, Y.; Yakovlev, V. P.

    2018-04-01

    The multi-physics design of a five cell, βG = 0 . 61, 644 MHz superconducting elliptical cavity being developed for an energy upgrade in the Facility for Rare Isotope Beams (FRIB) is presented. The FRIB energy upgrade from 200 MeV/u to 400 MeV/u for heaviest uranium ions will increase the intensities of rare isotope beams by nearly an order of magnitude. After studying three different frequencies, 1288 MHz, 805 MHz, and 644 MHz, the 644 MHz cavity was shown to provide the highest energy gain per cavity for both uranium and protons. The FRIB upgrade will include 11 cryomodules containing 5 cavities each and installed in 80-meter available space in the tunnel. The cavity development included extensive multi-physics optimization, mechanical and engineering analysis. The development of a niobium cavity is complete and two cavities are being fabricated in industry. The detailed design of the cavity sub-systems such as fundamental power coupler and dynamic tuner are currently being pursued. In the overall design of the cavity and its sub-systems we extensively applied experience gained during the development of 650 MHz low-beta cavities at Fermi National Accelerator Laboratory (FNAL) for the Proton Improvement Plan (PIP) II.

  13. New instrument calibration facility for the DOE Savannah River Site

    Energy Technology Data Exchange (ETDEWEB)

    Wilkie, W.H.; Polz, E.J. [Westinghouse Savannah River Company, Aiken, SC (United States)

    1993-12-31

    A new laboratory facility is being designed, constructed, and equipped at the Savannah River Site (SRS) as a fiscal year 1992 line item project. This facility will provide space and equipment for test, evaluation, repair, maintenance, and calibration of radiation monitoring instrumentation. The project will replace an obsolete facility and will allow implementation of program upgrades necessary to meet ANSI N323 requirements and National Voluntary Laboratory Accreditation Program (NVLAP) criteria for accreditation of federally owned secondary calibration laboratories. An outline of the project is presented including description, scope, cost, management organization, chronology, and current status. Selected design criteria and their impacts on the project are discussed. The upgraded SRS calibration program is described, and important features of the new facility and equipment that will accommodate this program are listed. The floor plan for the facility is shown, and equipment summaries and functional descriptions for each area are provided.

  14. New instrument calibration facility for the DOE Savannah River Site

    International Nuclear Information System (INIS)

    Wilkie, W.H.; Polz, E.J.

    1993-01-01

    A new laboratory facility is being designed, constructed, and equipped at the Savannah River Site (SRS) as a fiscal year 1992 line item project. This facility will provide space and equipment for test, evaluation, repair, maintenance, and calibration of radiation monitoring instrumentation. The project will replace an obsolete facility and will allow implementation of program upgrades necessary to meet ANSI N323 requirements and National Voluntary Laboratory Accreditation Program (NVLAP) criteria for accreditation of federally owned secondary calibration laboratories. An outline of the project is presented including description, scope, cost, management organization, chronology, and current status. Selected design criteria and their impacts on the project are discussed. The upgraded SRS calibration program is described, and important features of the new facility and equipment that will accommodate this program are listed. The floor plan for the facility is shown, and equipment summaries and functional descriptions for each area are provided

  15. Capabilities of the Large-Scale Sediment Transport Facility

    Science.gov (United States)

    2016-04-01

    pump flow meters, sediment trap weigh tanks , and beach profiling lidar. A detailed discussion of the original LSTF features and capabilities can be...ERDC/CHL CHETN-I-88 April 2016 Approved for public release; distribution is unlimited. Capabilities of the Large-Scale Sediment Transport...describes the Large-Scale Sediment Transport Facility (LSTF) and recent upgrades to the measurement systems. The purpose of these upgrades was to increase

  16. Feasibility Assessment of Using Power Plant Waste Heat in Large Scale Horticulture Facility Energy Supply Systems

    Directory of Open Access Journals (Sweden)

    Min Gyung Yu

    2016-02-01

    Full Text Available Recently, the Korean government has been carrying out projects to construct several large scale horticulture facilities. However, it is difficult for an energy supply to operate stably and economically with only a conventional fossil fuel boiler system. For this reason, several unused energy sources have become attractive and it was found that power plant waste heat has the greatest potential for application in this scenario. In this study, we performed a feasibility assessment of power plant waste heat as an energy source for horticulture facilities. As a result, it was confirmed that there was a sufficient amount of energy potential for the use of waste heat to supply energy to the assumed area. In Dangjin, an horticultural area of 500 ha could be constructed by utilizing 20% of the energy reserves. In Hadong, a horticulture facility can be set up to be 260 ha with 7.4% of the energy reserves. In Youngdong, an assumed area of 65 ha could be built utilizing about 19% of the energy reserves. Furthermore, the payback period was calculated in order to evaluate the economic feasibility compared with a conventional system. The initial investment costs can be recovered by the approximately 83% reduction in the annual operating costs.

  17. Metal hydride/chemical heat-pump development project. Phase I. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Argabright, T.A.

    1982-02-01

    The metal hydride/chemical heat pump (MHHP) is a chemical heat pump containing two hydrides for the storage and/or recovery of thermal energy. It utilizes the heat of reaction of hydrogen with specific metal alloys. The MHHP design can be tailored to provide heating and/or cooling or temperature upgrading over a wide range of input and ambient temperatures. The system can thus be used with a variety of heat sources including waste heat, solar energy or a fossil fuel. The conceptual design of the MHHP was developed. A national market survey including a study of applications and market sectors was conducted. The technical tasks including conceptual development, thermal and mechanical design, laboratory verification of design and material performance, cost analysis and the detailed design of the Engineering Development Test Unit (EDTU) were performed. As a result of the market study, the temperature upgrade cycle of the MHHP was chosen for development. Operating temperature ranges for the upgrader were selected to be from 70 to 110/sup 0/C (160 to 230/sup 0/F) for the source heat and 140 to 190/sup 0/C (280 to 375/sup 0/F) for the product heat. These ranges are applicable to many processes in industries such as food, textile, paper and pulp, and chemical. The hydride pair well suited for these temperatures is LaNi/sub 5//LaNi/sub 4/ /sub 5/Al/sub 0/ /sub 5/. The EDTU was designed for the upgrade cycle. It is a compact finned tube arrangement enclosed in a pressure vessel. This design incorporates high heat transfer and low thermal mass in a system which maximizes the coefficient of performance (COP). It will be constructed in Phase II. Continuation of this effort is recommended.

  18. Dynamic Response Testing in an Electrically Heated Reactor Test Facility

    Science.gov (United States)

    Bragg-Sitton, Shannon M.; Morton, T. J.

    2006-01-01

    Non-nuclear testing can be a valuable tool in development of a space nuclear power or propulsion system. In a non-nuclear test bed, electric heaters are used to simulate the heat from nuclear fuel. Standard testing allows one to fully assess thermal, heat transfer, and stress related attributes of a given system, but fails to demonstrate the dynamic response that would be present in an integrated, fueled reactor system. The integration of thermal hydraulic hardware tests with simulated neutronic response provides a bridge between electrically heated testing and full nuclear testing. By implementing a neutronic response model to simulate the dynamic response that would be expected in a fueled reactor system, one can better understand system integration issues, characterize integrated system response times and response characteristics, and assess potential design improvements at a relatively small fiscal investment. Initial system dynamic response testing was demonstrated on the integrated SAFE-100a heat pipe cooled, electrically heated reactor and heat exchanger hardware, utilizing a one-group solution to the point kinetics equations to simulate the expected neutronic response of the system (Bragg-Sitton, 2005). The current paper applies the same testing methodology to a direct drive gas cooled reactor system, demonstrating the applicability of the testing methodology to any reactor type and demonstrating the variation in system response characteristics in different reactor concepts. In each testing application, core power transients were controlled by a point kinetics model with reactivity feedback based on core average temperature; the neutron generation time and the temperature feedback coefficient are provided as model inputs. Although both system designs utilize a fast spectrum reactor, the method of cooling the reactor differs significantly, leading to a variable system response that can be demonstrated and assessed in a non-nuclear test facility.

  19. The ISOLDE RILIS pump laser upgrade and the LARIS Laboratory

    International Nuclear Information System (INIS)

    Marsh, B. A.; Berg, L.-E.; Fedorov, D. V.; Fedosseev, V. N.; Launila, O. J.; Lindroos, M.; Losito, R.; Osterdahl, F. K.; Pauchard, T.; Pohjalainen, I. T.; Sassenberg, U.; Seliverstov, M. D.; Sjoedin, A. M.; Transtroemer, G.

    2010-01-01

    On account of its high efficiency, speed and unmatched selectivity, the Resonance Ionization Laser Ion Source (RILIS) is the preferred method for ionizing the nuclear reaction products at the ISOLDE on-line isotope separator facility. By exploiting the unique electronic energy level 'fingerprint' of a chosen element, the RILIS process of laser step-wise resonance ionization enables an ion beam of high chemical purity to be sent through the mass selective separator magnet. The isobaric purity of a beam of a chosen isotope is therefore greatly increased. The RILIS, comprising of up to three frequency tunable pulsed dye lasers has been upgraded with the installation of a Nd:YAG pump laser as a replacement for the old Copper Vapor Laser (CVL) system. A summary of the current Nd:YAG pumped RILIS performance is given. To accompany the RILIS pump laser upgrade, a new ionization scheme for manganese has been developed at the newly constructed LAser Resonance Ionization Spectroscopy (LARIS) laboratory and successfully applied for on-line RILIS operation. An overview of the LARIS facility is given along with details of the ionization scheme development work for manganese.

  20. 242-A MCS Logic Acceptance Test Report for Year 2000 Upgrade

    International Nuclear Information System (INIS)

    TEATS, M.C.

    1999-01-01

    242-A Evaporator distributive control system upgrade to D/3 version 9.0-2 for year 2000 compliance. Testing was performed per test procedure HNF-3568. There were no unresolved exceptions. The system responded correctly to all testing and meets the requirements to operate the 242-A This report documents the acceptance test results for the Evaporator facility

  1. Anesthetic equipment, facilities and services available for pediatric ...

    African Journals Online (AJOL)

    2011-04-09

    Apr 9, 2011 ... standards and increased use of disposable anesthetic equipment. An audit of equipment and facilities for anesthetic care in pediatric patients is important and should be carried out periodically to appraise the situation for upgrading of essential anesthetic facilities and equipment. Appendix A. 18th March, ...

  2. Upgrading during difficult times

    International Nuclear Information System (INIS)

    Tiefenbach, K.

    1993-01-01

    The Co-op Upgrader is part of an integrated refinery and upgrader complex in Regina, Saskatchewan. The upgrader processes 50,000 bbl/d heavy sour crude oil, mostly Fosterton and dilute Lloydminster crude, via hydrogen addition and carbon rejection, desulfurization, demetallization, and denitrification to yield a synthetic crude blend. The synthetic crude is refined to produce gasoline and diesel fuel. Byproducts from the integrated operation include 100,000 tonnes/y of petroleum coke, 65,000 tonnes/y of sulfur, propane, butane, fuel oil, and metals (Ni and V) in the form of spent catalysts. Recent operational and economic challenges faced by the upgrader are reviewed. Technical challenges include operating the upgrader's high-temperature high-pressure heavy oil hydrotreating unit and distillate hydrogenation unit, removal and replacement of the desulfurization catalyst, waste management, and producing coke of sufficient quality. Economic challenges include the shrinking differential between light and heavy oil, higher prices for natural gas (the main raw material for hydrogen production for upgrading), seasonal changes in product specifications, and lower prices for sulfur and metal byproducts. The upgrader is also affected by interest rates since borrowing costs are the single largest expenditure after crude oil purchases. 4 figs

  3. On-line tritium production and heat deposition rate measurements at the Lotus facility

    International Nuclear Information System (INIS)

    Joneja, O.P.; Scherrer, P.; Anand, R.P.

    1994-01-01

    Integral tritium production and heat deposition measurement in a prototype fusion blanket would enable verification of the computational codes and the data based employed for the calculations. A large number of tritium production rate measurements have been reported for different type of blankets, whereas the direct heat deposition due to the mixed radiation field in the fusion environment, is still in its infancy. In order to ascertain the kerma factors and the photon production libraries, suitable techniques must be developed to directly measure the nuclear heat deposition rates in the materials required for the fusion systems. In this context, at the Lotus facility, we have developed an extremely efficient double ionizing chamber, for the on-line tritium production measurements and employed a pure graphite calorimeter to measure the nuclear heat deposition due to the mixed radiation field of the 14 MeV, Haefely neutron generator. This paper presents both systems and some of the recent measurements. (authors). 8 refs., 13 figs

  4. Technical specification upgrading at the Fast Flux Test Facility (FFTF)

    International Nuclear Information System (INIS)

    Baird, Q.L.; Franz, G.R.; Absher, K.R.

    1985-01-01

    The FFTF Technical Specifications were generated in 1977 and 1978 following submittal of the FSAR in 1976. A phased implementation program served to prepare the specifications for each stage of the plant startup with the complete specifications approved and implemented late in 1980 for the first ascent to full power. In January, 1983 WHC undertook an upgrading effort to implement changes to the FFTF technical specifications. This program has been pursued with appropriate attention to the CFR and industry standards and practice. Examples of these changes, discussion of the methods and planned activities for the future will be presented. Technical data will be provided to support the impact of specific limits. The benefits of changes and the criteria for change will be elaborated

  5. U.S.-Russia MPC and A upgrades at the Beloyarsk Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saraev, O.; Haase, M.; Smarto, C.; Mikkelsen, K.; Heinberg, C.; Showalter, R.; Soo Hoo, M.; Hatcher, C.; Forehand, M.

    1998-01-01

    During the January 1996 meeting of the Gore-Chernomyrdin Commission, the Beloyarsk Nuclear Power Plant (BNPP) was identified as one of the additional sites for cooperative projects on upgrading Materials Protection, Control and Accounting (MPC and A). Since June 1996, Sandia National Laboratories (SNL), Pacific Northwest National Laboratories (PNNL), and Los Alamos National Laboratory (LANL) have worked with BNPP to upgrade MPC and A at the facility. Some unique challenges were encountered because BNPP has an operating BN-600 600-Megawatt breeder reactor. SNL has been responsible for working with BNPP to implement physical protection upgrades to the Central Alarm Station, Fresh Fuel Storage building, Spent Fuel Storage Area, and Vehicle/Personnel Portal. In addition, improved communication equipment for the Ministry of the Interior (MVD) guards and training of personnel were provided. PNNL has been responsible for coordinating Material Control and Accounting (MC and A) upgrades at BNPP. PNNL, in conjunction with LANL, has implemented such MC and A upgrades as a computerized nuclear materials accounting system, training in MC and A elements, nondestructive assay instrumentation for fresh fuel, installation of a fork detector for measuring spent fuel, and installation of an underwater video camera for verification of spent fuel serial numbers

  6. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, Susila; Tang, Y.N.

    1994-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans. ((orig.))

  7. NSLS control system upgrade

    International Nuclear Information System (INIS)

    Smith, J.D.; Ramamoorthy, S.; Tang, Yong N.

    1995-01-01

    The NSLS consists of two storage rings, a booster and a linac. A major upgrade of the control system (installed in 1978) was undertaken and has been completed. The computer architecture is being changed from a three level star-network to a two level distributed system. The microprocessor subsystem, host computer and workstations, communication link and the main software components are being upgraded or replaced. Since the NSLS rings operate twenty four hours a day a year with minimum maintenance time, the key requirement during the upgrade phase is a non-disruptive transition with minimum downtime. Concurrent with the upgrade, some immediate improvements were required. This paper describes the various components of the upgraded system and outlines the future plans

  8. Conception of a modular HTR-process heat facility with optimization of the pressure level

    International Nuclear Information System (INIS)

    Bousack, H.

    1984-11-01

    The operation of a steam reformer heated by nuclear power with a process pressure of about 20 bar provides advantages with respect to process engineering due to the improved conversion and simplified product gas treatment for the follow-on process. The effects of a reduction in pressure on the components of the primary circuit in a modular HTR facility, as well as various process engineering possibilities for producing methanol in the follow-on process are discussed in this paper. Studies cover the influence of core geometry and power density, as well as possibilities of increasing the modular power at a maximum accident temperature of 1600 0 C. An inherently functioning area cooling system is proposed for afterheat removal outside the primary circuit. Based on the optimized pressure, a modular HTR process heat facility is conceived to produce methanol from natural gas and carbon dioxide basically satisfying the requirement of zero emission. (orig.) [de

  9. Green technologies for the environmental upgrading of infrastructures

    Directory of Open Access Journals (Sweden)

    Alessandra Battisti

    2013-05-01

    Full Text Available Over the last few decades, the globalization phenomenon has determined the exponential development - from an economic, cultural and political standpoint - of traffic flows, the number of means and infrastructures involved in communication and exchange. At the same time, these represent one of the most complicated environmental issues of contemporary times, but perhaps also one of the most outstanding opportunities for setting up processes aimed at upgrading the territory and its constructions, towards environmental regeneration and social reorganization. These, in turn, would produce and spread (as in some already established examples of infrastructure upgrading innovative and more sustainable forms of urban lifestyles. The present contribution aims at illustrating the former, beginning with research and experiments involving the development of eco-friendly meta-design models for the correct employment of “green technologies” in: meta-project research for small mobility facilities; expansion and redevelopment works for the Stazione Termini; experiments in design for some energy-efficient underground metro stops in Rome.

  10. Influence of CFC quality on the performance of TS limiter elements under cyclic heat loading

    International Nuclear Information System (INIS)

    Missirlian, M.; Greuner, H.; Hoeschen, T.; Linsmeier, Ch.; Richou, M.; Lipa, M.; Boeswirth, B.; Boscary, J.

    2011-01-01

    For the fabrication of 600 actively cooled finger elements for the Tore Supra pump limiter in operation since 2001 it was necessary to rely on two different batches of the CFC N11 grade (Carbon Fibre reinforced Composite) namely so-called SEP N11-92 (fabricated in 1992) and N11-98 (fabricated in 1998). It came out during the incoming inspection of the fingers that the bonding quality was degraded for the 98-batch so that an important number of tiles had to be repaired. Due to the coming upgrade of the Tore Supra heating system, two high heat flux test campaigns were performed on the neutral beam GLADIS facility (IPP Garching, Germany) including micro-structural analyses in order to evaluate, compare and understand the fatigue behaviour of 92- and 98-batch finger elements.

  11. Upgrading of regulatory activities in Belarus

    International Nuclear Information System (INIS)

    Rozdyalovskaya, L.F.; Shabanov, V.V.

    1998-01-01

    Upgrading of the National regulatory regime in the Republic of Belarus started in fact in 1992 after the Interregional Nuclear and Radiation Safety Inspectorate had been established in the Gostekhnadzor of Belarus. In this connection, the Gostekhnadzor was transformed into the Gospromatomnadzor - the State Committee for Supervision of Industrial and Nuclear Safety. In 1993, by special decrees issued by the Council of Ministers the Gospromatomnadzor was designated a National Competent Body responsible for nuclear materials. Now the Committee is part of the Ministry for Emergencies. In the Committee, the issues of nuclear and radiation safety are dealt with by 6 departments among which the Department for Nuclear and Radiation Safety Regulation and the Interregional Nuclear and Radiation Safety inspectorate play major role. The created regulatory structure makes it possible to fully perform the control of situation at nuclear- and radiation-hazardous facilities and take adequate measures aimed at strengthening their safety. The priority directions of regulatory work by the Promatomnadzor include development and revision of regulations governing radiation and nuclear safety and upgrading of the training procedure to enhance the radiation safety and technical knowledge of the Promatomnadzor staff. (author)

  12. Upgrading of bio-oil to boiler fuel by catalytic hydrotreatment and esterification in an efficient process

    International Nuclear Information System (INIS)

    Zhang, Xinghua; Chen, Lungang; Kong, Wei; Wang, Tiejun; Zhang, Qi; Long, Jinxing; Xu, Ying; Ma, Longlong

    2015-01-01

    Bio-oil can't be directly used as fuel due to its deteriorate properties. Here, an efficient catalytic upgrading process for the bio-oil, including esterification, hydrogenation, hydrodeoxygenation and depolymerization, is proposed with multifunctional catalyst Ni/SiO 2 –ZrO 2 and biomass-derived solvent ethanol. Results showed that esters, alcohols, phenolics, and cyclo-ketones were the main components in the upgraded bio-oil while aldehydes were removed completely via catalytic hydrogenation and acids were removed by catalytic esterification with supercritical ethanol. The pH value of upgraded bio-oil rose drastically from 2.38 to 5.24, and the high heating value increased to 24.4 MJ kg −1 . Comparison characterization on the upgraded and crude bio-oil using FT-IR, GPC (Gel permeation chromatography) and 13 C NMR (Nuclear Magnetic Resonance) demonstrated that lignin-derived oligomers contained in crude bio-oil were further depolymerized over Ni/SiO 2 –ZrO 2 catalyst. The improved properties suggest that the upgraded bio-oil is more suitable to be used as boiler fuel. Furthermore, the loss of carbon is negligible because formation of coke is suppressed during the upgrading process. - Highlights: • Acid can be converted via catalytic esterification in supercritical ethanol. • Aldehydes can be removed completely during the upgrading process. • Lignin-derived oligomers were further depolymerized during the upgrading process. • Formation of coke is effectively inhibited during the upgrading process

  13. Bi-Provincial Upgrader

    International Nuclear Information System (INIS)

    1997-01-01

    Husky Oil's Bi-Provincial Upgrader is located in the rural municipality of Wilton, east of Lloydminster, Saskatchewan. It is jointly owned by Husky Oil and the Saskatchewan government. The upgrader is designed to produce 7.300 m 3 /cd of synthetic crude from 8.440 m 3 /cd of diluted Lloyd blend and distillates from the existing Lloydminster refinery. The designed coke and sulphur production is 415 t/day and 240 t/day respectively. Chronology of the Bi-Provincial Upgrader project was presented, along with details of the heavy oil feedstock properties for Cold Lake, Lloydminster and Lloyd Blend. Upgrader production history since start-up, synthetic crude oil customers, and the evolution of prices for Edmonton light vs. Husky LLB at Hardisty were also reviewed. 3 tabs., 9 figs

  14. Upgrading biogas by a low-temperature CO2 removal techni

    Directory of Open Access Journals (Sweden)

    Ahmed M.I. Yousef

    2016-06-01

    Full Text Available Biogas, a renewable energy source, is primarily composed of methane and carbon dioxide and other gaseous species. Biogas upgrading for removing CO2 from raw biogas is a necessary step before the biogas to be used as vehicle fuel or injected into the natural gas grid. Therefore, the present work aimed to propose a low-temperature CO2 removal process as an alternative to the conventional biogas upgrading technologies (water scrubbing, chemical and physical scrubbing, membranes and Pressure swing adsorption. A typical model biogas mixture of 60 mol.% CH4 and 40 mol.% CO2 is considered. The present process showed that a product purity of 94.5 mol.% CH4 is obtained from compressed biogas by combining distillation, flash separation, auxiliary refrigeration and internal heat recovery with a potential specific energy consumption of 0.26 kW h/Nm3 raw biogas. The process has been simulated in Aspen HYSYS with avoiding the occurrence of CO2 freeze-out. The process delivers the captured CO2 in liquid form with a purity of 99.7 mol.% as a by-product for transport at 110 bar. It is concluded that the proposed upgrading process can serve as a new environmentally friendly approach to CO2 removal with an interesting energy-efficient alternative to the conventional upgrading techniques.

  15. Calorimeter probes for measuring high thermal flux. [in electric-arc jet facilities for planetary entry heating simulation

    Science.gov (United States)

    Russell, L. D.

    1979-01-01

    The paper describes expendable, slug-type calorimeter probes developed for measuring high heat-flux levels of 10-30 kW/sq cm in electric-arc jet facilities. The probes are constructed with thin tungsten caps mounted on Teflon bodies; the temperature of the back surface of the tungsten cap is measured, and its rate of change gives the steady-state, absorbed heat flux as the calorimeter probe heats to destruction when inserted into the arc jet. It is concluded that the simple construction of these probes allows them to be expendable and heated to destruction to obtain a measurable temperature slope at high heating rates.

  16. Challenges and limitations in retrofitting facilities for low frequency noise

    Energy Technology Data Exchange (ETDEWEB)

    Wierzba, P. [ATCO Noise Management, Calgary, AB (Canada)

    2007-07-01

    The trend to revise and increase environmental regulations regarding low frequency noise emissions from oil and gas facilities was discussed. Noise related complaints can often be traced to low frequency noise, which is the unwanted sound with a frequency range falling within 31.5-Hz, 63-Hz, and 125-Hz octave bands. This paper also discussed the challenges and limitations of field retrofits of the facilities aimed at reducing low frequency noise. The main sources of low frequency noise associated with a compression facility are the radiator cooler, engine exhaust and the building envelope. Regulators are paying close attention not only to the overall noise exposure as measured by the A-weighted levels, but also to the quality of noise emitted by the particular frequency spectrum. The Alberta Energy and Utilities Board recently issued Noise Control Directive 38 and made it a requirement to perform low frequency noise impact assessment for permitting of all new energy facilities. Under Directive 38, the low frequency noise assessment is to be performed using the C-weighted scale as a measure in addition to the previously used A-weighted scale. Directive 38 recommends that in order to avoid low frequency noise problems the difference between the C-weighted and A-weighted levels at the residential locations should be lower than 20 dB. This implies that noise should be limited to 60 dBC for Category 1 residences of low dwelling density. Small upgrades and changes can be made to lower low frequency noise emissions. These may include upgrading building wall insulation, providing wall-to-skid isolation system, upgrading the fan blades, or reducing the rpm of the fans. It was concluded that these upgrades should be considered for facilities in close proximity to residential areas. 3 refs., 2 tabs., 7 figs.

  17. Review of current and proposed reactor upgrades

    International Nuclear Information System (INIS)

    Moon, R.M.

    1985-01-01

    In an effort to foresee the future health of neutron scattering, a survey of plans to upgrade reactors and associated experimental facilities was undertaken. The results indicate that we are now entering a period characterized by a substantial reinvestment in reactor sources and expansion in the number of neutron scattering instruments. For the group of institutions participating in this survey there will be a total investment in improved sources and experimental facilities of $500 M to $1,000 M over the next decade. This investment will result in a 30 to 40% increase in the total power of research reactors and an increase of 30 to 50% in the number of neutron scattering instruments. It is therefore reasonable to anticipate an approximate doubling in the number of reactor neutrons incident on samples in the mid 90s compared to the present

  18. OPG Western Waste Management Facility

    Energy Technology Data Exchange (ETDEWEB)

    Julian, J. [Ontario Power Generation, Western Waste Management Facility, Tiverton, ON (Canada)

    2011-07-01

    The Ontario Power Generation (OPG) Western Waste Management Facility (WWMF) uses a computer based Supervisory Control and Data Acquisition (SCADA) system to monitor its facility, and control essential equipment. In 2007 the WWMF Low and Intermediate Level Waste (L&ILW) technical support section conducted a review of outstanding corrective maintenance work. Technical support divided all work on a system by system basis. One system under review was the Waste Volume Reduction Building (WVRB) control room SCADA system. Technical support worked with control maintenance staff to assess all outstanding work orders on the SCADA system. The assessment identified several deficiencies in the SCADA system. Technical support developed a corrective action plan for the SCADA system deficiencies, and in February of 2008 developed an engineering change package to correct the observed deficiencies. OPG Nuclear Waste Engineering approved the change package and the WVRB Control Room Upgrades construction project started in January of 2009. The WVRB control room upgrades construction work was completed in February of 2009. This paper provides the following information regarding the WWMF SCADA system and the 2009 WVRB Control Room Upgrades Project: A high-level explanation of SCADA system technology, and the various SCADA system components installed in the WVRB; A description of the state of the WVRB SCADA system during the work order assessment, identifying all deficiencies; A description of the new design package; A description of the construction project; and, A list of lessons learned during construction and commissioning, and a path forward for future upgrades. (author)

  19. OPG Western Waste Management Facility

    International Nuclear Information System (INIS)

    Julian, J.

    2011-01-01

    The Ontario Power Generation (OPG) Western Waste Management Facility (WWMF) uses a computer based Supervisory Control and Data Acquisition (SCADA) system to monitor its facility, and control essential equipment. In 2007 the WWMF Low and Intermediate Level Waste (L&ILW) technical support section conducted a review of outstanding corrective maintenance work. Technical support divided all work on a system by system basis. One system under review was the Waste Volume Reduction Building (WVRB) control room SCADA system. Technical support worked with control maintenance staff to assess all outstanding work orders on the SCADA system. The assessment identified several deficiencies in the SCADA system. Technical support developed a corrective action plan for the SCADA system deficiencies, and in February of 2008 developed an engineering change package to correct the observed deficiencies. OPG Nuclear Waste Engineering approved the change package and the WVRB Control Room Upgrades construction project started in January of 2009. The WVRB control room upgrades construction work was completed in February of 2009. This paper provides the following information regarding the WWMF SCADA system and the 2009 WVRB Control Room Upgrades Project: A high-level explanation of SCADA system technology, and the various SCADA system components installed in the WVRB; A description of the state of the WVRB SCADA system during the work order assessment, identifying all deficiencies; A description of the new design package; A description of the construction project; and, A list of lessons learned during construction and commissioning, and a path forward for future upgrades. (author)

  20. Incidence, predictors, and procedural results of upgrade to resynchronization therapy: the RAFT upgrade substudy.

    Science.gov (United States)

    Essebag, Vidal; Joza, Jacqueline; Birnie, David H; Sapp, John L; Sterns, Laurence D; Philippon, Francois; Yee, Raymond; Crystal, Eugene; Kus, Teresa; Rinne, Claus; Healey, Jeffrey S; Sami, Magdi; Thibault, Bernard; Exner, Derek V; Coutu, Benoit; Simpson, Chris S; Wulffhart, Zaev; Yetisir, Elizabeth; Wells, George; Tang, Anthony S L

    2015-02-01

    The resynchronization-defibrillation for ambulatory heart failure trial (RAFT) study demonstrated that adding cardiac resynchronization therapy (CRT) in selected patients requiring de novo implantable cardiac defibrillators (ICD) reduced mortality as compared with ICD therapy alone, despite an increase in procedure-related adverse events. Data are lacking regarding the management of patients with ICD therapy who develop an indication for CRT upgrade. Participating RAFT centers provided data regarding de novo CRT-D (CRT with ICD) implant, upgrade to CRT-D during RAFT (study upgrade), and upgrade within 6 months after presentation of study results (substudy). Substudy centers enrolled 1346 (74.9%) patients in RAFT, including 644 de novo, 80 study upgrade, and 60 substudy CRT attempts. The success rate (initial plus repeat attempts) was 95.2% for de novo versus 96.3% for study upgrade and 90.0% for substudy CRT attempts (P=0.402). Acute complications occurred among 26.2% of de novo versus 18.8% of study upgrade and 3.4% of substudy CRT implantation attempts (PRAFT study and other trials. © 2014 American Heart Association, Inc.

  1. The experimental facility for investigation of MHD heat transfer in perspective coolants in nuclear energetics.

    Science.gov (United States)

    Batenin, B. M.; Belyaev, I. A.; Birukov, D. A.; Frick, P. G.; Nikitina, I. S.; Manchkha, S. P.; Pyatnitskaya, N. Yu; Razuvanov, N. G.; Sviridov, E. V.; Sviridov, V. G.

    2017-11-01

    Paper presents the current results of work conducted by a joint research group of MPEI-JIHT RAS for experimental study of liquid metals heat transfer. The team of specialists of MPEI-JIHT RAS put into operation a new mercury MHD facility RK-3. The main components of this stand are: a unique electromagnet, created by specialists of the Budker Institute of Nuclear Physics (BINP), and a sealed liquid-metal circuit. The facility will be explored lifting and standpipe flow of liquid metal in a transverse magnetic field in channels of different forms. For the experiments on the study of heat transfer and hydrodynamics of flows for measuring characteristics such as temperature, speed, pulse characteristics, probe method is used. Presents the first experimental results obtained for a pipe in a transverse magnetic field. During the experiments with various flow parameters data was obtained and processed with constructing temperature fields, dimensionless wall temperature distributions and heat transfer coefficients along the perimeter of the work area. Modes with low frequency pulsations of temperature were discovered. The boundaries where low frequency temperature fluctuations occur were defined in a circular tube.

  2. Geothermal heating retrofit at the Utah State Prison Minimum Security Facility. Final report, March 1979-January 1986

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    This report is a summary of progress and results of the Utah State Prison Geothermal Space Heating Project. Initiated in 1978 by the Utah State Energy Office and developed with assistance from DOE's Division of Geothermal and Hydropower Technologies PON program, final construction was completed in 1984. The completed system provides space and water heating for the State Prison's Minimum Security Facility. It consists of an artesian flowing geothermal well, plate heat exchangers, and underground distribution pipeline that connects to the existing hydronic heating system in the State Prison's Minimum Security Facility. Geothermal water disposal consists of a gravity drain line carrying spent geothermal water to a cooling pond which discharges into the Jordan River, approximately one mile from the well site. The system has been in operation for two years with mixed results. Continuing operation and maintenance problems have reduced the expected seasonal operation from 9 months per year to 3 months. Problems with the Minimum Security heating system have reduced the expected energy contribution by approximately 60%. To date the system has saved the prison approximately $18,060. The total expenditure including resource assessment and development, design, construction, performance verification, and reporting is approximately $827,558.

  3. Heat Loss Measurements in Buildings Utilizing a U-value Meter

    DEFF Research Database (Denmark)

    Sørensen, Lars Schiøtt

    Heating of buildings in Denmark accounts for approximately 40% of the entire national energy consumption. For this reason, a reduction of heat losses from building envelopes are of great importance in order to reach the Bologna CO2 emission reduction targets. Upgrading of the energy performance...... of buildings is a topic of huge global interest these years. Not only heating in the temperate and arctic regions are important, but also air conditioning and mechanical ventilation in the tropical countries contribute to an enormous energy consumption and corresponding CO2 emission. In order to establish...... the best basis for upgrading the energy performance, it is important to measure the heat losses at different locations on a building facade, in order to optimize the energy performance. The author has invented a U-value meter, enabling measurements of heat transfer coefficients. The meter has been used...

  4. Los Alamos High-Brightness Accelerator FEL (HIBAF) facility

    Energy Technology Data Exchange (ETDEWEB)

    Cornelius, W.D.; Bender, S.; Meier, K.; Thode, L.E.; Watson, J.M.

    1989-01-01

    The 10-/mu/m Los Alamos free-electron laser (FEL) facility is being upgraded. The conventional electron gun and bunchers have been replaced with a much more compact 6-MeV photoinjector accelerator. By adding existing parts from previous experiments, the primary beam energy will be doubled to 40 MeV. With the existing 1-m wiggler (/lambda//sub w/ = 2.7 cm) and resonator, the facility can produce photons with wavelengths from 3 to 100 /mu/m when lasing on the fundamental mode and produce photons in the visible spectrum with short-period wigglers or harmonic operation. After installation of a 150/degree/ bend, a second wiggler will be added as an amplifier. The installation of laser transport tubes between the accelerator vault and an upstairs laboratory will provide experimenters with a radiation-free environment for experiments. Although the initial experimental program of the upgraded facility will be to test the single accelerator-master oscillator/power amplifier configuration, some portion of the operational time of the facility can be dedicated to user experiments. 13 refs., 5 figs., 6 tabs.

  5. Upgrade of the Nuclear Material Protection, Control and Accounting System at the VNIIEF Industrial Zone

    International Nuclear Information System (INIS)

    Lewis, J.C.; Maltsev, V.; Singh, S.P.

    1999-01-01

    The Industrial Zone at the Russian Federal Nuclear Center/All-Russian Scientific Research Institute of Experimental Physics (RFNC/VNEEF) consists of ten guarded areas with twenty two material balance areas (A and As). The type of facilities in the Industrial Zone include storage sites, machine shops, research facilities, and training facilities. Modernization of the Material Protection, Control and Accounting (MPC and A) System at the Industrial Zone started in 1997. This paper provides a description of, the methodology/strategy used in the upgrade of the MFC and A system

  6. ICRF induced edge plasma convection in ASDEX upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Wei [Max Planck Institute for Plasma Physics, Garching/Greifswald (Germany); University of Ghent, Ghent (Belgium); Institute of Plasma Physics, Chinese Academy of Sciences, Hefei (China); Feng, Yuehe; Lunt, Tilmann; Jacquot, Jonathan; Coster, David; Bilato, Roberto; Bobkov, Volodymyr; Ochoukov, Roman [Max Planck Institute for Plasma Physics, Garching/Greifswald (Germany); Noterdaeme, Jean-Marie [Max Planck Institute for Plasma Physics, Garching/Greifswald (Germany); University of Ghent, Ghent (Belgium); Colas, Laurent [CEA, IRFM, Saint-Paul-Lez-Durance (France); Collaboration: ASDEX Upgrade Team

    2016-07-01

    Ion Cyclotron Range of Frequency (ICRF) heating is one of the main auxiliary plasma heating methods in tokamaks. It relies on the fast wave to heat the plasma. However the slow wave can also be generated parasitically. The parallel electric field of the slow wave can induce large biased plasma potential through sheath rectification. The rapid variation of this rectified potential across the magnetic field can cause significant E x B convection in the Scrape-Off Layer (SOL). The ICRF induced convection can affect the SOL density, influence the ICRF power coupling and enhance the strength of plasma-wall interactions. To explore these physics, we not only show the experimental evidences in ASDEX Upgrade, but also present the associated simulation results with the 3D edge plasma fluid code EMC3-Eirene. Further simulations via combination of EMC3-Eirene and a sheath code SSWICH in an iterative and quasi self-consistent way can give good predictions for future experiments.

  7. Recent technological advances in the application of nano-catalytic technology to the enhanced recovery and upgrading of bitumen and heavy oils

    Energy Technology Data Exchange (ETDEWEB)

    Pereira Almao, P. [Calgary Univ., AB (Canada). Schulich School of Engineering

    2013-11-01

    Advances in Nanotechnology, such as manufacturing of nano-catalysts allow the online (during processing) and on site production of nano-catalysts for heavy oils upgrading. These inventions have also facilitated the development of two lines of heavy oils upgrading processes that make use of nano-catalysts for producing upgraded oil: In Situ Upgrading and Field Upgrading. Producing chemical upgrading of heavy oils is achievable and economically viable at lower temperatures and lower pressures than used in most upgraders if the use of nano-catalysts were implemented. The spontaneity of thermal, steam and hydro processing reactions for converting the different chemical families of hydrocarbons present in the heaviest fractions of heavy oils and bitumen (HO-B) into lighter products was shown recently. Spontaneity was measured by the value of the change of free energy at low pressure. These undesirable paths are spontaneous and uncontrollable under thermal cracking conditions, and require providing years of residence time for intermolecular hydrogen redistribution to minimize olefins polymerization, if at all possible. Instead, hydroprocessing in the presence of hydrogen activating catalysts would create an abundance of hydrogen radicals impeding large molecules condensation and olefins proliferation. In Situ Upgrading: performs coupled Enhanced Oil Recovery with In Reservoir Upgrading via Hot Fluid Injection (HFI). The heat handling of this HFI process and the production of transportable oil with no need of diluent from the start of operation completes the originality of it. This technology uses heavy fractions separated from produced oil to reintroduce heat into the reservoir along with suspended nano-catalysts and hydrogen. These components react in the well bore and inside the reservoir to release more heat (hydroprocessing reactions are exothermic) producing light gases and volatile hydrocarbons that contribute to increase oil detachment from the rock resulting in

  8. IRRAD: The New 24GeV/c Proton Irradiation Facility at CERN

    CERN Document Server

    Gkotse, Blerina; Moll, Michael; Ravotti, Federico

    2016-01-01

    The proton and mixed-field irradiation facilities at the CERN PS East Area (known as IRRAD1 and IRRAD2), have been heavily exploited for irradiation of particle detectors, electronic components and materials since 1992. With the increasing demand of irradiation experiments, and in view of the High-Luminosity upgrade of the CERN Large Hadron Collider (HL-LHC), these facilities suffered of a number of unpleasant restrictions such as the space availability, the maximum achievable particle flux and several access constraints. In the framework of the AIDA project, an upgrade of these facilities was carried out during the Long Shutdown 1 (LS1) of the CERN accelerator complex. The new combined East Area IRRADiation facility (EA-IRRAD) started the commissioning in October 2014. While the new proton facility (IRRAD) continue to be mainly devoted to the radiation hardness studies for the High Energy Physics community, the new mixed-field facility (CHARM) mainly hosts irradiation experiments for the validation of electr...

  9. Control and data acquisition upgrades for NSTX-U

    Energy Technology Data Exchange (ETDEWEB)

    Davis, W.M., E-mail: bdavis@pppl.gov; Tchilinguirian, G.J., E-mail: gtchilin@pppl.gov; Carroll, T., E-mail: tcarroll@pppl.gov; Erickson, K.G., E-mail: kerickson@pppl.gov; Gerhardt, S.P., E-mail: sgerhardt@pppl.gov; Henderson, P., E-mail: phenderson@pppl.gov; Kampel, S.H., E-mail: skampel@pppl.gov; Sichta, P., E-mail: psichta@pppl.gov; Zimmer, G.N., E-mail: gzimmer@pppl.gov

    2016-11-15

    Highlights: • The NSTX-U upgrade is nearing completion, and various control and data acquisition upgrades are needed. • The Digital Coil Protection System is a major addition which provides hardware and software to protect the magnetic coils from the complex, increased, stresses added from the upgrade. • The increased computational requirements for the upgrade have largely followed Moore’s Law, and enhancements to the infrastructure and computer hardware should maintain or exceed the previous functionality. • Data requirements for Fast 2-D cameras have exceeded those of “conventional” time-varying signals. There has been a particular emphasis and increase in data from IR cameras. - Abstract: The extensive NSTX Upgrade (NSTX-U) Project includes major components which allow a doubling of the toroidal field strength to 1 T, of the Neutral Beam heating power to 12 MW, and the plasma current to 2 MA, and substantial structural enhancements to withstand the increased electromagnetic loads. The maximum pulse length will go from 1.5 to 5 s. The larger and more complex forces on the coils will be protected by a Digital Coil Protection System, which requires demanding real-time data input rates, calculations and responses. The amount of conventional digitized data for a given pulse is expected to increase from 2.5 to 5 GB per second of pulse. 2-D Fast Camera data is expected to go from 2.5 GB/pulse to 10, and another 2 GB/pulse is expected from new IR cameras. Our network capacity will be increased by a factor of 10, with 10 Gb/s fibers used for the major trunks. 32-core Linux systems will be used for several functions, including between-shot data processing, MDSplus data serving, between-shot EFIT analysis, real-time processing, and for a new capability, between-shot TRANSP. Improvements to the MDSplus events subsystem will be made through the use of both UDP and TCP/IP based methods and the addition of a dedicated “event server”.

  10. MHD equilibrium identification on ASDEX-Upgrade

    International Nuclear Information System (INIS)

    McCarthy, P.J.; Schneider, W.; Lakner, K.; Zehrfeld, H.P.; Buechl, K.; Gernhardt, J.; Gruber, O.; Kallenbach, A.; Lieder, G.; Wunderlich, R.

    1992-01-01

    A central activity accompanying the ASDEX-Upgrade experiment is the analysis of MHD equilibria. There are two different numerical methods available, both using magnetic measurements which reflect equilibrium states of the plasma. The first method proceeds via a function parameterization (FP) technique, which uses in-vessel magnetic measurements to calculate up to 66 equilibrium parameters. The second method applies an interpretative equilibrium code (DIVA) for a best fit to a different set of magnetic measurements. Cross-checks with the measured particle influxes from the inner heat shield and the divertor region and with visible camera images of the scrape-off layer are made. (author) 3 refs., 3 figs

  11. Catalytic Upgrading of bio-oil using 1-octene and 1-butanol over sulfonic acid resin catalysts

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, Zhijun; Wang, Qingwen; Tripathi, Prabhat; Pittman, Charles U.

    2011-02-04

    Raw bio-oil from fast pyrolysis of biomass must be refined before it can be used as a transporation fuel, a petroleum refinery feed or for many other fuel uses. Raw bio-oil was upgraded with the neat model olefin, 1-octene, and with 1-octene/1-butanol mixtures over sulfonic acid resin catalysts frin 80 to 150 degrees celisus in order to simultaneously lower water content and acidity and to increase hydrophobicity and heating value. Phase separation and coke formation were key factors limiting the reaction rate during upgrading with neat 1-octene although octanols were formed by 1-octene hydration along with small amounts of octyl acetates and ethers. GC-MS analysis confirmed that olefin hydration, carboxylic acid esterification, acetal formation from aldehydes and ketones and O- and C-alkylations of phenolic compounds occurred simultaneously during upgrading with 1-octene/1-butanol mixtures. Addition of 1-butanol increased olefin conversion dramatically be reducing mass transfer restraints and serving as a cosolvent or emulsifying agent. It also reacted with carboxylic acids and aldehydes/ketones to form esters, and acetals, respectively, while also serving to stabilize bio-oil during heating. 1-Butanol addition also protected the catalysts, increasing catalyst lifetime and reducing or eliminationg coking. Upgrading sharply increased ester content and decreased the amounts of levoglucosan, polyhydric alcohols and organic acids. Upgrading lowered acidity (pH value rise from 2.5 to >3.0), removed the uppleasant ordor and increased hydrocarbon solubility. Water content decreased from 37.2% to < 7.5% dramatically and calorific value increased from 12.6 MJ kg to about 30.0 MJ kg.

  12. Training and research reactor facility longevity extension program

    International Nuclear Information System (INIS)

    Carriveau, G.W.

    1991-01-01

    Since 1943, over 550 training and research reactors have been in operation. According to statistics from the International Atomic Energy Agency, ∼325 training and research reactors are currently in service. This total includes a wide variety of designs covering a range of power and research capabilities located virtually around the world. A program has been established at General Atomics (GA) that is dedicated to the support of extended longevity of training and research reactor facilities. Aspects of this program include the following: (1) new instrumentation and control systems; (2) improved and upgraded nuclear monitoring and control channels; (3) facility testing, repair and upgrade services that include (a) pool or tank integrity, (b) cooling system, and (c) water purification system; (4) fuel element testing procedures and replacement; (5) control rod drive rebuilding and upgrades; (6) control and monitoring system calibration and repair service; (7) training services, including reactor operations, maintenance, instrumentation calibration, and repair; and (8) expanded or new uses such as neutron radiography and autoradiography, isotope production, nuclear medicine, activation analysis, and material properties modification

  13. [Steps aimed at upgrading a pharmaceutical care sector: the case of surgery].

    Science.gov (United States)

    Guérin, A; Thibault, M; Nguyen, C; Lebel, D; Bussières, J-F

    2014-07-01

    While the concept of clinical pharmacy was developed in the 1960s, clinical programs are characterized by their great variety and disparity when it comes to the presence of pharmacists in healthcare sectors. This article aims to describe a method in which pharmaceutical care sectors in healthcare facilities can be upgraded. This is a descriptive study supporting the upgrade of pharmaceutical care practiced in the surgery sector of a 500-bed mother-child university hospital center, the CHU Sainte-Justine. The pharmacy department employs more than 70 healthcare professionals. The study involved these proposed upgrading steps: firstly, a review of the literature; secondly, a description of the profile of the sector; thirdly, a description of the upgrading of pharmacist practice in surgery. A total of 137 articles were compiled, seven of which were selected to evaluate the impact and eight a description of the pharmacist's role in surgery. The authors did not identify any particular pharmaceutical activity based on very good quality data (A). However, there were five based on good quality data (B) and seven that lacked adequate proof (C, D) in relation to the practice of surgery. Nevertheless, a number of other authors described the development of the pharmacist's clinical role in surgery. There are few data on the impact of pharmacists in surgery. This descriptive study proposes a number of steps aimed at upgrading pharmaceutical care within a Quebec university hospital center. Copyright © 2013 Elsevier Masson SAS. All rights reserved.

  14. The D0 Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Abachi, S.; D0 Collaboration

    1995-07-01

    In this paper we describe the approved DO Upgrade detector, and its physics capabilities. The DO Upgrade is under construction and will run during the next Fermilab collider running period in early 1999 (Run II). The upgrade is designed to work at the higher luminosities and shorter bunch spacings expected during this run. The major elements of t he upgrade are: a new tracking system with a silicon tracker, scintillating fiber tracker, a 2T solenoid, and a central preshower detector; new calorimeter electronics; new muon trigger and tracking detectors with new muon system electronics; a forward preshower detector; new trigger electronics and DAQ improvements to handle the higher rates.

  15. Initial results in SST-1 after up-gradation

    Science.gov (United States)

    Pradhan, S.; Khan, Z.; Tanna, V. L.; Prasad, U.; Paravastu, Y.; Raval, D. C.; Masand, H.; Kumar, Aveg; Dhongde, J. R.; Jana, S.; Kakati, B.; Patel, K. B.; Bhandarkar, M. K.; Shukla, B. K.; Ghosh, D.; Patel, H. S.; Parekh, T. J.; Mansuri, I. A.; Dhanani, K. R.; Varadharajulu, A.; Khristi, Y. S.; Biswas, P.; Gupta, C. N.; George, S.; Semwal, P.; Sharma, D. K.; Gulati, H. K.; Mahajan, K.; Praghi, B. R.; Banaudha, M.; Makwana, A. R.; Chudasma, H. H.; Kumar, M.; Manchanda, R.; Joisa, Y. S.; Asudani, K.; Pandya, S. N.; Pathak, S. K.; Banerjee, S.; Patel, P. J.; Santra, P.; Pathan, F. S.; Chauhan, P. K.; Khan, M. S.; Thankey, P. L.; Prakash, A.; Panchal, P. N.; Panchal, R. N.; Patel, R. J.; Mahsuria, G. I.; Sonara, D. P.; Patel, K. M.; Jayaswal, S. P.; Sharma, M.; Patel, J. C.; Varmora, P.; Srikanth, G. L. N.; Christian, D. R.; Garg, A.; Bairagi, N.; Babu, G. R.; Panchal, A. G.; Vora, M. M.; Singh, A. K.; Sharma, R.; Nimavat, H. D.; Shah, P. R.; Purwar, G.; Raval, T. Y.; Sharma, A. L.; Ojha, A.; Kumar, S.; Ramaiya, N. K.; Siju, V.; Gopalakrishna, M. V.; Kumar, A.; Sharma, P. K.; Atrey, P. K.; Kulkarni, SV; Ambulkar, K. K.; Parmar, P. R.; Thakur, A. L.; Raval, J. V.; Purohit, S.; Mishra, P. K.; Adhiya, A. N.; Nagora, U. C.; Thomas, J.; Chaudhari, V. K.; Patel, K. G.; Dalakoti, S.; Virani, C. G.; Gupta, S.; Kumar, Ajay; Chaudhari, B.; Kaur, R.; Srinivasan, R.; Raju, D.; Kanabar, D. H.; Jha, R.; Das, A.; Bora, D.

    2017-04-01

    SST-1 Tokamak has recently completed the 1st phase of up-gradation with successful installation and integration of all its First Wall components. The First Wall of SST-1 comprises of ∼ 3800 high heat flux compatible graphite tiles being assembled and installed on 132 CuCrZr heat sink back plates engraved with ∼ 4 km of leak tight baking and cooling channels in five major sub groups equipped with ∼ 400 sensors and weighing ∼ 6000 kg in total in thirteen isolated galvanic and six isolated hydraulic circuits. The phase-1 up-gradation spectrum also includes addition of Supersonic Molecular Beam Injection (SMBI) both on the in-board and out-board side, installation of fast reciprocating probes, adding some edge plasma probe diagnostics in the SOL region, installation and integration of segmented and up-down symmetric radial coils aiding/controlling plasma rotations, introduction of plasma position feedback and density controls etc. Post phase-I up-gradation spanning from Nov 2014 till June 2016, initial plasma experiments in up-graded SST-1 have begun since Aug 2016 after a brief engineering validation period in SST-1. The first experiments in SST-1 have revealed interesting aspects on the ‘eddy currents in the First Wall support structures’ influencing the ‘magnetic Null evolution dynamics’ and the subsequent plasma start-up characteristics after the ECH pre-ionization, the influence of the first walls on the ‘field errors’ and the resulting locked modes observed, the magnetic index influencing the evolution of the equilibrium of the plasma column, low density supra-thermal electron induced discharges and normal ohmic discharges etc. Presently; repeatable ohmic discharges regimes in SST-1 having plasma currents in excess of 65 KA (qa ∼ 3.8, BT = 1.5 T) with a current ramp rates ∼ 1.2 MA/s over a duration of ∼ 300 ms with line averaged densities ∼ 0.8 × 1019 and temperatures ∼ 200 eV with copious MHD signatures have been experimentally

  16. Analysis and Interpretation of the Plasma Dynamic Response to Additional Heating Power using different Diagnostics

    International Nuclear Information System (INIS)

    Manini, A.

    2002-07-01

    The main goal in the research of nuclear fusion, and therefore in tokamak research as well, is the development of a high power, steady-state power plant. To obtain the high power required for igniting the plasma, the size of the device must be very large. The performance of the tokamak plasma depends in particular on the plasma shape and on the internal plasma profiles. These profiles include those of the current density and the pressure, two quantities that can be modified by means of auxiliary heating methods such as Electron Cyclotron Heating (ECH). ECH is a very important tool due to its capability of injecting highly localised and intense power. Off-axis ECH and Electron Cyclotron Current Drive (ECCD) modify both current density and electron temperature profiles, leading to modification of confinement and stability properties. in particular, complete stabilisation of magnetohydrodynamic modes using ECCD is feasible. Furthermore, ECH is crucial as a mean of increasing the bootstrap current fraction through the formation of internal transport barriers, so that confinement is also improved. Finally, it is also noted that modulated ECH (MECH) is a very effective tool for perturbative energy transport experiments in many different regimes. Experiments performed in the TCV and the ASDEX Upgrade tokamaks are presented. The role of TCV is very important due to its flexibility of varying the plasma shape, its versatile high power ECH system at both the second and third electron cyclotron harmonics, and due to the numerous diagnostics installed, e.g. the two soft X-ray (SXR) diagnostics which simultaneously allow high temporal and spatial resolutions. The importance of ASDEX Upgrade is related to its large size, which makes it a reactor-relevant experimental facility, and to the Neutral Beam Injection (NBI) and ECH heating facilities, which allow a study of heat and particle transport in either mostly ion-heated or mostly electron-heated regimes. Moreover, for the

  17. Open absorption heat pump for waste heat utilization in the forest industry. A study of technical and economic potential; Oeppen absorptionsvaermepump foer uppgradering av spillvaerme fraan skogsindustrin. Studie av teknisk och ekonomisk potential

    Energy Technology Data Exchange (ETDEWEB)

    Westermark, Mats; Vidlund, Anna

    2006-02-15

    Waste heat from the forest industry is mainly humid air or humid flue gases with somewhat too low dew point for direct use as district heating or for other qualified purposes. Upgrading of the temperature by heat pumps is thus often necessary for the full use of the waste heat. This study evaluates an open absorption heat, based on hygroscopic condensation. The hygroscopic condenser has the potential to replace mechanical heat pumps or conventional absorption heat pumps (based on lithium bromide) for the upgrading of heat from humid gases. The goal for the project is to evaluate technology and potential for an open absorption heat pump for heat recovery from humid gases in the forest industry. In an open heat pump the humid gas is brought in direct contact with the hygroscopic liquid (whereas a conventional heat pump uses an intermediate circuit with evaporation of water in the evaporator). The direct contact makes it possible to recover the heat at a higher temperature than the dew point of the humid gas without the use of evaporator. The target group for the study is the forest industry and its suppliers of technology and knowledge. The study has been carried out in cooperation with representatives from the forest industry and from suppliers of equipment. The study shows that the forest industry has good potential to upgrade waste heat from humid air to district heating. The waste heat can be extracted from various humid gases such as exit air from paper machines, wood driers, green liquid quenchers and flue gases from soda boilers, mesa kilns, bark-fired boilers and gas engines. Hygroscopic condensation is considered to give economic and environmental advantages compared to conventional absorption heat pumps due to much less consumption of driving heat. An interesting special case is the regeneration of the hygroscopic medium by direct contact with hot flue gases and for this application a patent application has been filed. Upgrading of waste heat to process

  18. Status of TMX upgrade diagnostics construction

    International Nuclear Information System (INIS)

    Hornady, R.S.; Davis, J.C.; Simonen, T.C.

    1981-01-01

    This report describes the status of the initial TMX Upgrade diagnostics and the state of development of additional diagnostics being prepared for later TMX Upgrade experiments. The initial diagnostic instrument set has been described in the TMX Upgrade Proposal. This set is required to get TMX Upgrade operational and to evaluate its initial performance. Additional diagnostic instruments are needed to then carry out the more detailed experiments outlined by the TMX Upgrade program milestones. The relation of these new measurements to the physics program is described in The TMX Upgrade Program Plan

  19. Upgrading the safety assessment of exported nuclear power plants

    International Nuclear Information System (INIS)

    Rosen, M.

    1978-01-01

    An examination of the safety aspects of exported nuclear power plants demonstrates that additional and somewhat special considerations exist for these plants, and thus that some new approaches may be required to insure their safety. In view of the generally small regulatory staffs of importing countries, suggestions are given for measures which should be taken by the various organizations involved in the export and import of nuclear power facilities to raise the level of the very essential safety assessment. These include the upgrading of the 'export edition' of the traditionally supplied safety documentation by use of a Supplementary Information Report, written specifically for the needs of a smaller and/or less technically qualified staff, which highlights the differences that exist between the facility to be constructed and the supposedly similar reference plant of the supplier country; by improvement of supporting safety documentation to allow for adequate understanding of significant safety parameters; and by attention to the needs of smaller countries in the critical Operating Regulations (Technical Specifications for Operation). Consideration is also given to upgrading the regulatory effort and to the obligations of principal organizations involved with exported nuclear plants, including national and international, for insuring the importing countries' technical readiness and the adequacy of the regulatory effort. Special attention is directed towards the project contract as a means of implementing programmes to achieve these goals. (author)

  20. Slum Upgrading and Health Equity.

    Science.gov (United States)

    Corburn, Jason; Sverdlik, Alice

    2017-03-24

    Informal settlement upgrading is widely recognized for enhancing shelter and promoting economic development, yet its potential to improve health equity is usually overlooked. Almost one in seven people on the planet are expected to reside in urban informal settlements, or slums, by 2030. Slum upgrading is the process of delivering place-based environmental and social improvements to the urban poor, including land tenure, housing, infrastructure, employment, health services and political and social inclusion. The processes and products of slum upgrading can address multiple environmental determinants of health. This paper reviewed urban slum upgrading evaluations from cities across Asia, Africa and Latin America and found that few captured the multiple health benefits of upgrading. With the Sustainable Development Goals (SDGs) focused on improving well-being for billions of city-dwellers, slum upgrading should be viewed as a key strategy to promote health, equitable development and reduce climate change vulnerabilities. We conclude with suggestions for how slum upgrading might more explicitly capture its health benefits, such as through the use of health impact assessment (HIA) and adopting an urban health in all policies (HiAP) framework. Urban slum upgrading must be more explicitly designed, implemented and evaluated to capture its multiple global environmental health benefits.

  1. Combined electrolysis and catalytic exchange (CECE) technology - an economical alternative for heavy water upgraders using water distillation

    International Nuclear Information System (INIS)

    Ryland, D.K.; Sadhankar, R.R.

    2003-01-01

    Heavy water upgrading is a unique and crucial part of a CANDU power station. Water distillation (DW) systems are used for heavy water upgrading in all CANDU stations. The DW upgrader is designed to take advantage of the difference in relative volatility (a measure of separation of isotopes) between H 2 O and D 2 O. However, the low relative volatility of the H 2 O/D 2 O system requires large number of stages (long columns) and large reflux ratios (large reboiler loads) - thus resulting in significant capital and operating costs. Atomic Energy of Canada Limited (AECL) developed the Combined Electrolysis and Catalytic Exchange (CECE) technology as an economical alternative to the DW system. CECE-based upgraders have been demonstrated in pilot scale facilities at AECL Chalk River Laboratories and in Hamilton, Ontario. This design is based on catalytic hydrogen isotope exchange between water and hydrogen gas. (author)

  2. A laser heating facility for energy-dispersive X-ray absorption spectroscopy

    DEFF Research Database (Denmark)

    Kantor, Innokenty; Marini, C.; Mathon, O.

    2018-01-01

    A double-sided laser heating setup for diamond anvil cells installed on the ID24 beamline of the ESRF is presented here. The setup geometry is specially adopted for the needs of energy-dispersive X-ray absorption spectroscopic (XAS) studies of materials under extreme pressure and temperature...... conditions. We illustrate the performance of the facility with a study on metallic nickel at 60 GPa. The XAS data provide the temperature of the melting onset and quantitative information on the structural parameters of the first coordination shell in the hot solid up to melting....

  3. MHD phenomena in advanced scenarios on ASDEX upgrade and the influence of localised electron heating and current drive

    International Nuclear Information System (INIS)

    Guenter, S.; Gude, A.; Hobirk, J.; Maraschek, M.; Peeters, A.G.; Pinches, S.D.; Schade, S.; Wolf, R.C.; Saarelma, S.

    2001-01-01

    MHD instabilities in advanced tokamak scenarios on the one hand are favourable as they can contribute to the stationarity of the current profiles and act as a trigger for the formation of internal transport barriers. In particular fishbone oscillations driven by fast particles arising from neutral beam injection (NBI) are shown to trigger internal transport barriers in low and reversed magnetic shear discharges. During the whistling down period of the fishbone oscillation the transport is reduced around the corresponding rational surface, leading to an increased pressure gradient. This behaviour is explained by the redistribution of the resonant fast particles resulting in a sheared plasma rotation due to the return current in the bulk plasma, which is equivalent to a radial electric field. On the other hand MHD instabilities limit the accessible operating regime. Ideal and resistive MHD modes such as double tearing modes, infernal modes and external kinks degrade the confinement or even lead to disruptions in ASDEX Upgrade reversed shear discharges. Localized electron cyclotron heating and current drive is shown to significantly affect the MHD stability of this type of discharges. (author)

  4. MHD phenomena in advanced scenarios on ASDEX Upgrade and the influence of localized electron heating and current drive

    International Nuclear Information System (INIS)

    Guenter, S.; Gude, A.; Hobirk, J.; Maraschek, M.; Schade, S.; Wolf, R.C.; Saarelma, S.

    2001-01-01

    On the one hand, MHD instabilities in advanced tokamak scenarios are favourable as they can contribute to the stationarity of the current profiles and act as a trigger for the formation of internal transport barriers (ITBs). In particular, fishbone oscillations driven by fast particles arising from NBI are shown to trigger ITBs in low and reversed magnetic shear discharges. During the whistling down period of the fishbone oscillation the transport is reduced around the corresponding rational surface, leading to an increased pressure gradient. This behaviour could be explained by the redistribution of the resonant fast particles resulting in a sheared plasma rotation due to the return current in the bulk plasma, which is equivalent to a radial electric field. On the other hand, MHD instabilities limit the accessible operating regime. Ideal and resistive MHD modes such as double tearing modes, infernal modes and external kinks degrade the confinement or even lead to disruptions in ASDEX Upgrade reversed shear discharges. Localized electron cyclotron heating and current drive are shown to significantly affect the MHD stability of this type of discharge. (author)

  5. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    International Nuclear Information System (INIS)

    Sunarno; Rochmadi,; Mulyono, Panut; Budiman, Arief

    2016-01-01

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  6. Catalytic cracking of the top phase fraction of bio-oil into upgraded liquid oil

    Energy Technology Data Exchange (ETDEWEB)

    Sunarno [Chemical Engineering Department, Riau University, Kampus Binawidya KM 12,5 Pekanbaru 28293 (Indonesia); Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Rochmadi,; Mulyono, Panut [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281 (Indonesia); Budiman, Arief, E-mail: abudiman@ugm.ac.id [Chemical Engineering Department, Gadjah Mada University, Jalan Grafika No. 2 Bulaksumur,Yogyakarta 55281(Indonesia); Center for Energy Studies, Gadjah Mada University, Sekip K1A, Yogyakarta 55281 (Indonesia)

    2016-06-03

    The energy consumption is increasing, while oil reserves as a primary energy resource are decreasing, so that is the reason seeking alternative energy source is inevitable. Biomass especially oil palm empty fruit bunches (EFB) which is abundant in Indonesia can be processed into bio-oil by pyrolysis process. The potential for direct substitution of bio-oil for petroleum may be limited due to the high viscosity, high oxygen content, low heating value, and corrosiveness. Consequently, upgrading of the bio-oil before use is inevitable to give a wider variety of applications of its liquid product. Furthermore, upgrading process to improve the quality of bio-oil by reduction of oxygenates involves process such as catalytic cracking. The objective of this research is to study the effect of operation temperature on yield and composition of upgraded liquid oil and to determine physical properties. Bio-oil derived from EFB was upgraded through catalytic cracking using series tubular reactor under atmospheric pressure on a silica-alumina catalyst. Results show that increasing temperature from 450 to 600 °C, resulting in decreasing of upgraded liquid oil (ULO) yield, decreasing viscosity and density of ULO, but increasing in calorimetric value of ULO. The increasing temperature of cracking also will increase the concentration of gasoline and kerosene in ULO.

  7. Thermal performance analysis of Brayton cycle with waste heat recovery boiler for diesel engines of offshore oil production facilities

    International Nuclear Information System (INIS)

    Liu, Xianglong; Gong, Guangcai; Wu, Yi; Li, Hangxin

    2016-01-01

    Highlights: • Comparison of Brayton cycle with WHRB adopted in diesel engines with and without fans by thermal performance. • Waste heat recovery technology for FPSO. • The thermoeconomic analysis for the heat recovery for FPSO. - Abstract: This paper presents the theoretical analysis and on-site testing on the thermal performance of the waste heat recovery system for offshore oil production facilities, including the components of diesel engines, thermal boilers and waste heat boilers. We use the ideal air standard Brayton cycle to analyse the thermal performance. In comparison with the traditional design, the fans at the engine outlet of the waste heat recovery boiler is removed due to the limited space of the offshore platform. The cases with fan and without fan are compared in terms of thermal dynamics performance, energy efficiency and thermo-economic index of the system. The results show that the application of the WHRB increases the energy efficiency of the whole system, but increases the flow resistance in the duct. It is proved that as the waste heat recovery boiler takes the place of the thermal boiler, the energy efficiency of whole system without fan is slightly reduced but heat recovery efficiency is improved. This research provides an important guidance to improve the waste heat recovery for offshore oil production facilities.

  8. Irradiation facilities in JRR-3M

    International Nuclear Information System (INIS)

    Ohtomo, Akitoshi; Sigemoto, Masamitsu; Takahashi, Hidetake

    1992-01-01

    Irradiation facilities have been installed in the upgraded JRR-3 (JRR-3M) in Japan Atomic Energy Research Institute (JAERI). There are hydraulic rabbit facilities (HR), pneumatic rabbit facilities (PN), neutron activation analysis facility (PN3), uniform irradiation facility (SI), rotating irradiation facility and capsule irradiation facilities to carry out the neutron irradiation in the JRR-3M. These facilities are operated using a process control computer system to centerize the process information. Some of the characteristics for the facilities were satisfactorily measured at the same time of reactor performance test in 1990. During reactor operation, some of the tests are continued to confirm the basic characteristics on facilities, for example, PN3 was confirmed to have enough performance for activation analysis. Measurement of neutron flux at all irradiation positions has been carried out for the equilibrium core. (author)

  9. Suitability of oil bioremediation in an Artic soil using surplus heating from an incineration facility

    DEFF Research Database (Denmark)

    Couto, Nazare; Fritt-Rasmussen, Janne; Jensen, Pernille Erland

    2014-01-01

    A 168-day period field study, carried out in Sisimiut, Greenland, assessed the potential to enhance soil remediation with the surplus heating from an incineration facility. This approach searches a feasible ex situ remediation process that could be extended throughout the year with low costs. Ind...

  10. A demonstrated method for upgrading existing control room interiors

    International Nuclear Information System (INIS)

    Brice, R.M.; Terrill, D.; Brice, R.M.

    1991-01-01

    The main control room (MCR) of any nuclear power plant can justifiably be called the most important area staffed by personnel in the entire facility. The interior workstation configuration, equipment arrangement, and staff placement all affect the efficiency and habitability of the room. There are many guidelines available that describe various human factor principles to use when upgrading the environment of the MCR. These involve anthropometric standards and rules for placement of peripheral equipment. Due to the variations in plant design, however, hard-and-fast rules have not and cannot be standardized for retrofits in any significant way. How then does one develop criteria for the improvement of a MCR? The purpose of this paper is to discuss, from the designer's point of view, a method for the collection of information, development of criteria, and creation of a final design for a MCR upgrade. This method is best understood by describing the successful implementation at Tennessee Valley Authority's Sequoyah nuclear plant

  11. 300 Area process sewer piping upgrade and 300 Area treated effluent disposal facility discharge to the City of Richland Sewage System, Hanford Site, Richland, Washington

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The U.S. Department of Energy (DOE) is proposing to upgrade the existing 300 Area Process Sewer System by constructing and operating a new process sewer collection system that would discharge to the 300 Area Treated Effluent Disposal Facility. The DOE is also considering the construction of a tie-line from the TEDF to the 300 Area Sanitary Sewer for discharging the process wastewater to the City of Richland Sewage System. The proposed action is needed because the integrity of the old piping in the existing 300 Area Process Sewer System is questionable and effluents might be entering the soil column from leaking pipes. In addition, the DOE has identified a need to reduce anticipated operating costs at the new TEDF. The 300 Area Process Sewer Piping Upgrade (Project L-070) is estimated to cost approximately $9.9 million. The proposed work would involve the construction and operation of a new process sewer collection system. The new system would discharge the effluents to a collection sump and lift station for the TEDF. The TEDF is designed to treat and discharge the process effluent to the Columbia River. The process waste liquid effluent is currently well below the DOE requirements for radiological secondary containment and is not considered a RCRA hazardous waste or a State of Washington Hazardous Waste Management Act dangerous waste. A National Pollutant Discharge Elimination, System (NPDES) permit has been obtained from the U.S. Environmental Protection Agency for discharge to the Columbia River. The proposed action would upgrade the existing 300 Area Process Sewer System by the construction and operation of a new combined gravity, vacuum, and pressurized process sewer collection system consisting of vacuum collection sumps, pressure pump stations, and buried polyvinyl chloride or similar pipe. Two buildings would also be built to house a main collection station and a satellite collection station.

  12. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    Science.gov (United States)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-05-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  13. Upgrades of DARWIN, a dose and spectrum monitoring system applicable to various types of radiation over wide energy ranges

    International Nuclear Information System (INIS)

    Sato, Tatsuhiko; Satoh, Daiki; Endo, Akira; Shigyo, Nobuhiro; Watanabe, Fusao; Sakurai, Hiroki; Arai, Yoichi

    2011-01-01

    A dose and spectrum monitoring system applicable to neutrons, photons and muons over wide ranges of energy, designated as DARWIN, has been developed for radiological protection in high-energy accelerator facilities. DARWIN consists of a phoswitch-type scintillation detector, a data-acquisition (DAQ) module for digital waveform analysis, and a personal computer equipped with a graphical-user-interface (GUI) program for controlling the system. The system was recently upgraded by introducing an original DAQ module based on a field programmable gate array, FPGA, and also by adding a function for estimating neutron and photon spectra based on an unfolding technique without requiring any specific scientific background of the user. The performance of the upgraded DARWIN was examined in various radiation fields, including an operational field in J-PARC. The experiments revealed that the dose rates and spectra measured by the upgraded DARWIN are quite reasonable, even in radiation fields with peak structures in terms of both spectrum and time variation. These results clearly demonstrate the usefulness of DARWIN for improving radiation safety in high-energy accelerator facilities.

  14. Further development of NEPTUN photon tagging facility

    Energy Technology Data Exchange (ETDEWEB)

    Symochko, Dmytro; Arnould, Michaela; Aumann, Thomas; Baumann, Martin; Pietralla, Norbert; Scheit, Heiko; Semmler, Diego; Walz, Christopher [Institut fuer Kernphysik, Darmstadt Univ. (Germany)

    2016-07-01

    The low-energy photon tagging facility NEPTUN at the superconducting Darmstadt linear accelerator (SDALINAC) has been constructed with the aim to study the photoabsorption cross section of the nuclei in the energy regions of Pygmy Dipole and Giant Dipole Resonances. Recently it went through the series of commissioning runs, which proved the concept and the ability of NEPTUN to tag the discreet nuclear states. Also, based on the results of the commissioning, major upgrade was developed to optimize the setup. Upgraded tagger will be able to operate with 60 MeV electron beam and will have extended focal plane with energy bite of more than 10 MeV. After completion of upgrade it will be possible to perform total dipole response measurement in the energy region 5-35 MeV for one target using only 2-3 settings of the spectrometer. Presentation will focus on the analysis results of commissioning runs and details of the proposed upgrade plan.

  15. High Resolution BPM Upgrade for the ATF Damping Ring at KEK

    International Nuclear Information System (INIS)

    Eddy, N.; Briegel, C.; Fellenz, B.; Gianfelice-Wendt, E.; Prieto, P.; Rechenmacher, R.; Semenov, A.; Voy, D.; Wendt, M.; Zhang, D.; Terunuma, N.

    2011-01-01

    A beam position monitor (BPM) upgrade at the KEK Accelerator Test Facility (ATF) damping ring has been accomplished, carried out by a KEK/FNAL/SLAC collaboration under the umbrella of the global ILC R and D effort. The upgrade consists of a high resolution, high reproducibility read-out system, based on analog and digital down-conversion techniques, digital signal processing, and also implements a new automatic gain error correction schema. The technical concept and realization as well as results of beam studies are presented. The next generation of linear colliders require ultra-low vertical emittance of <2 pm-rad. The damping ring at the KEK Accelerator Test Facility (ATF) is designed to demonstrate this mission critical goal. A high resolution beam position monitor (BPM) system for the damping ring is one of the key tools for realizing this goal. The BPM system needs to provide two distnict measurements. First, a very high resolution (∼100-200nm) closed-orbit measurement which is averaged over many turns and realized with narrowband filter techniques - 'narrowband mode'. This is needed to monitor and steer the beam along an optimum orbit and to facilitate beam-based alignment to minimize non-linear field effects. Second, is the ability to make turn by turn (TBT) measurements to support optics studies and corrections necessary to achieve the design performance. As the TBT measurement necessitates a wider bandwidth, it is often referred to as 'wideband mode'. The BPM upgrade was initiated as a KEK/SLAC/FNAL collaboration in the frame of the Global Design Initiative of the International Linear Collider. The project was realized and completed using Japan-US funds with Fermilab as the core partner.

  16. HELCZA-High heat flux test facility for testing ITER EU first wall components.

    Czech Academy of Sciences Publication Activity Database

    Prokůpek, J.; Samec, K.; Jílek, R.; Gavila, P.; Neufuss, S.; Entler, Slavomír

    2017-01-01

    Roč. 124, November (2017), s. 187-190 ISSN 0920-3796. [SOFT 2016: Symposium on Fusion Technology /29./. Prague, 05.09.2016-09.09.2016] Institutional support: RVO:61389021 Keywords : HELCZA * High heat flux * Electron beam testing * Test facility * Plasma facing components * First wall * Divertora Subject RIV: JF - Nuclear Energetics OBOR OECD: Nuclear related engineering Impact factor: 1.319, year: 2016 www.sciencedirect.com/science/article/pii/S0920379617302818

  17. Reconstruction of Co-60 Irradiation Facility No.1

    International Nuclear Information System (INIS)

    Nakamura, Yoshiteru; Takada, Isao; Kaneko, Hirohisa; Hirao, Toshio; Haneda, Noriyuki; Mitomo, Shouichi; Tachibana, Hiroyuki; Yoshida, Kenzou

    1989-01-01

    Cobalt Irradiation Facility No.1 was constructed in 1964 as the first large scale Co-60 irradiation facility equipped a deep water pool for source storage of Co-60 sources. Recently, the reconstruction of the facility was decided because the aging of various parts of the facility became remarkable and new research programs required upgradings of the facility. Important points of upgradings are as follows: A shielding capacity of the source storage and pool is increased to 55.5 PBq from 18.5 PBq. The opening in a floor of the irradiation room which is used for the source lifting in the room, is enlarged in order to utilize a large and high intensity source. Radiation resistance of the irradiation apparatus and installed equipments in the radiation room is increased for a high dose rate irradiation. Basic structure and shape of the facility building such as shielding, pool and building roof is not changed but electrical, mechanical equipments and systems are completely renewed. To increase a reliability, the irradiation apparatus and systems are also replaced with an improved and up-to-date one designed based on operation experiences of Co-60 facilities at TRCRE through many years. In addition, auxiliary equipments such as radiation monitors, manipulators, water treatment system and so on are replaced. This report presents the reconstruction of Co-60 Irradiation Facility No.1 stressing on the replacement and modification of the irradiation apparatus. (author)

  18. Bohunice Nuclear Power Plant Safety Upgrading Program

    International Nuclear Information System (INIS)

    Toth, A.; Fagula, L.

    1996-01-01

    Bohunice nuclear Power Plant generation represents almost 50% of the Slovak republic electric power production. Due to such high level of commitment to nuclear power in the power generation system, a special attention is given to safe and reliable operation of NPPs. Safety upgrading and operational reliability improvement of Bohunice V-1 NPP was carried out by the Bohunice staff continuously since the plant commissioning. In the 1990 - 1993 period extensive projects were realised. As a result of 'Small Reconstruction of the Bohunice V-1 NPP', the standards of both the nuclear safety and operational reliability have been significantly improved. The implementation of another modifications that will take place gradually during extended refuelling outages and overhauls in the course of 1996 through 1999, is referred to as the Gradual Reconstruction of the Bohunice V-1 Plant. The general goal of the V-1 NPP safety upgrading is the achievement of internationally acceptable level of nuclear safety. Extensive and financially demanding modification process of Bohunice V-2 NPP is likely to be implemented after a completion of the Gradual Reconstruction of the Bohunice V-1 NPP, since the year 1999. With this in mind, a first draft of the strategy of the Bohunice V-2 NPP upgrading program based on Probabilistic Safety assessment consideration was developed. A number of actions with a general effect on Bohunice site safety is evident. All these activities are aimed at reaching the essential objective of Bohunice NPP Management - to ensure a safe, reliable and effective electric energy and heat generation at the Bohunice site. (author)

  19. Upgrading the reactor noise diagnostic systems at the Paks NPP

    International Nuclear Information System (INIS)

    Czibok, T.; Dezsoe, Z.; Kiss, K.; Krinizs, K.; Lipcsei, S.

    2002-01-01

    The paper reports on the actual step in upgrading process of the reactor noise diagnostic systems at Paks NPP. This step has mainly a technical character. Renewal of facilities for signal conditioning and for data acquisition is going on. Autonomous systems at each of the four reactor units will be able to acquire a set of data series which can be arbitrarily chosen from the whole set of several hundred in-core neutron and other signals. The autonomous systems can be remotely controlled by a central computer through the local network. Modularity and extensibility are important features of the new systems: the size of the set of available signals can be extended and new modules for more advanced evaluations can be installed later. Present plans for system hardware upgrading are outlined, together with some technical details of measurement control, data acquisition moduls and network communication.(abstract)

  20. Repairing and Upgrading Your PC

    CERN Document Server

    Thompson, Robert

    2009-01-01

    Repairing and Upgrading Your PC delivers start-to-finish instructions, simple enough for even the most inexperienced PC owner, for troubleshooting, repairing, and upgrading your computer. Written by hardware experts Robert Bruce Thompson and Barbara Fritchman Thompson, this book covers it all: how to troubleshoot a troublesome PC, how to identify which components make sense for an upgrade, and how to tear it all down and put it back together. This book shows how to repair and upgrade all of your PC's essential components.

  1. Energy Efficiency for the Nunamiut People

    Energy Technology Data Exchange (ETDEWEB)

    Goodman, Dan

    2014-04-09

    The goal of this project is to upgrade existing building facilities owned by Nunamiut Corporation in Anaktuvuk Pass, AK. The upgrades mentioned will include lighting, heating system, insulation and smart control units designed to increase the energy efficiency of Village Corporation owned buildings.

  2. Upgrading elastomer seals for nuclear service

    Energy Technology Data Exchange (ETDEWEB)

    Wittich, K C; Wensel, R; LaRose, R; Kuran, S

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs.

  3. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; LaRose, R.; Kuran, S.

    1995-06-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussions with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author). 2 refs., 6 figs

  4. Upgrading elastomer seals for nuclear service

    International Nuclear Information System (INIS)

    Wittich, K.C.; Wensel, R.; Larose, R.; Kuran, S.

    1998-01-01

    Pumps, valves and instruments in nuclear plants have historically contained whatever elastomer each equipment supplier traditionally used for corresponding non-nuclear service. The proliferation of elastomer compounds, and their sometimes uncertain reliability, is now being reduced by upgrading and standardizing on a handful of compounds that have each been verified to be high performers for their class of service conditions. The objective is to make cost-effective improvements in the reliability and integrity of equipment in Canadian-designed nuclear plants. The effort focuses on elastomer seals and includes: understanding sealing fundamentals, developing relevant data for superior compounds for each service, and improving quality assurance methods, including handling and inspection guidelines. In practice, discussion with plant personnel and review of plant records are the first step. Two severe-service examples are given where these needs have been met by the following progression of activities: inspecting and laboratory testing of seals removed from service, preliminary and qualification testing of improvements, introduction into service, and monitoring the upgraded seals during phase-in periods. Large gains in reliability and integrity have been demonstrated for simulated normal and accident service conditions of heat, radiation and other deteriorative influences. Significant savings in maintenance costs are also projected. (author)

  5. Upgrading the accelerator facility at Nuclear Science Centre

    International Nuclear Information System (INIS)

    Roy, A.; Prakash, P.N.

    1995-01-01

    In this paper, we first describe what the linac consists of, then give the deliverable beam parameters and highlight some of the technically challenging aspects. At the end some of the possible new experimental facilities are briefly mentioned that would exploit the new range of ion beams effectively. 5 refs., 5 figs., 1 tab

  6. The Apatity nuclear heating plant project: modern technical and economic issues of nuclear heat application in Russia

    International Nuclear Information System (INIS)

    Adamov, E.O.; Romenkov, A.A.

    1998-01-01

    Traditionally Russia is a country with advanced structure of centralized heat supply. Many thermal plants and heating networks need technical upgrading to improve their technical and economic efficiency. Fossil fuelled heating capacities have a negative influence on ecology, which can be seen especially in the northern regions of Russia. Furthermore, fossil fuel prices are rising in Russia. The above factors tend to intensify the need for alternative heat sources being capable of solving the problem. Nuclear heat sources may be the alternative. In this paper, the main features of a proposed NHP in the Murmansk region are summarized. (author)

  7. Energy secretary Spencer Abraham announces department of energy 20-year science facility plan

    CERN Multimedia

    2003-01-01

    "In a speech at the National Press Club today, U.S. Energy Secretary Spencer Abraham outlined the Department of Energy's Office of Science 20-year science facility plan, a roadmap for future scientific facilities to support the department's basic science and research missions. The plan prioritizes new, major scientific facilities and upgrades to current facilities" (1 page).

  8. Update on the University of Missouri-Columbia Research Reactor Upgrade

    Energy Technology Data Exchange (ETDEWEB)

    McKibben, J C; Rhyne, J J [University of Missouri-Columbia (United States)

    1992-07-01

    The University of Missouri-Columbia (MU) is in the process of upgrading the research and operational capabilities of the MU Research Reactor (MURR) and associated facilities. The plans include an expanded research building that will double the laboratory space, the addition of new research programs, instrumentation and equipment, a cold neutron source, and improved reactor systems. These enhancements, which are in various stages of completion, will greatly expand the present active multidisciplinary research programs at MURR.

  9. Operation of ASDEX Upgrade with tungsten coated walls

    International Nuclear Information System (INIS)

    Rohde, V.

    2002-01-01

    An alternative for low-Z materials in the main chamber of a future fusion device are high-Z materials, but the maximal tolerable concentration in the plasma core is restricted. A step by step approach to employ tungsten at the central column of ASDEX Upgrade was started in 1999. Meanwhile almost the whole central column is covered with tiles, which were coated by PVD with tungsten. Up to now 9000 s of plasma discharge covering all relevant scenarios were performed. Routine operation of ASDEX Upgrade was not affected by the tungsten. Typical concentrations below 10 -5 were found. The tungsten concentration is mostly connected to the transport into the core plasma, not to the tungsten erosion. It can be demonstrated, that additional central heating can eliminate the tungsten accumulation. These experiments demonstrate the compatibility of fusion plasmas with W plasma facing components under reactor relevant conditions. The erosion pattern found by post mortem analysis indicates that the main effect is ion sputtering. The main erosion of tungsten seems to occur during plasma ramp-up and ramp-down. (author)

  10. Feasibility of maintaining natural convection mode core cooling in research reactor power upgrades

    International Nuclear Information System (INIS)

    Ha, J.J.; Belhadj, M.; Aldemir, T.; Christensen, R.N.

    1987-01-01

    Two operational concerns for natural convection coooled research reactors using plate type fuels are: 1) pool top 16 N activity (PTNA), and 2) nucleate boiling in core channels. The feasibility assessment of a power upgrade while maintaining natural convection mode core cooling requires addressing these operational concerns. Previous studies have shown that: a) The conventional technique for reducing PTNA by plume dispersion may not be effective in a large power upgrade of research reactors with small pools. b) Currently used correlations to predict onset of nucleate boiling (ONB) in thin, rectangular core channels are not valid for low-velocity, upward flows such as encountered in natural convection cooling. The PTNA depends on the velocity distribution in the reactor pool. COMMIX-1A code is used to determine the three-dimensional velocity fields in The Ohio State University Research Reactor (OSURR) pool as a function of varying design conditions, following a power upgrade to 500 kW with LEU fuel. It is shown that a sufficiently deep stagnant water layer can be created below the pool top by properly choosing the disperser flow rate. The ONB heat flux is experimentally determined for channel gaps and upward flow velocities in the range 2mm-4mm and 3-16 cm/sec., respectively. Two alternatives to plume dispersion for reducing PTNA and a new correlation to determine the ONB heat flux in thin, rectangular channels under low-velocity, upward flow conditions are proposed. (Author)

  11. RTNS-II fusion materials irradiation facility

    International Nuclear Information System (INIS)

    Heikkinen, D.W.; Tuckerman, D.B.; Davis, J.C.; Massoletti, D.J.; Short, D.W.

    1986-01-01

    The Rotating Target Neutron Source (RTNS-II) facility provides an intense source of 14-MeV neutrons for the fusion energy programs of Japan and the United States. Each of the two identical accelerator-based neutron sources is capable of providing source strengths in excess of 3 x 10 13 n/s using deuteron beam currents up to 150 mA. The present status of the facility, as well as the various upgrade options, will be described in detail

  12. Scientific upgrades at the high flux isotope reactor at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Selby, D.L.; Garrett, D.L.; Lucas, A.T.; Reeves, M.E.

    2001-01-01

    The United States Department of Energy is sponsoring a number of projects that will provide scientific upgrades to the neutron science facilities associated with the high flux isotope reactor (HFIR) located at Oak Ridge National Laboratory. Funding for the first upgrade project was initiated in 1996 and all presently identified upgrade projects are expected to be completed by the end of 2003. The upgrade projects include: 1) larger beam tubes, 2) a new monochromator drum for the HB-1 beam line, 3) a new HB-2 beam line system that includes one thermal guide and a new monochromator drum, 4) new instruments for the HB-2 beamline, 5) a new monochromator drum for the HB-3 beam line, 6) a supercritical hydrogen cold source system to be retrofitted into the HB-4 beam tube, 7) a 3.5 kW refrigeration system at 20 K to support the cold source and a new building to house it, 8) a new HB-4 beam line system composed of four cold neutron guides with various mirror coatings and associated shielding, 9) a number of new instruments for the cold beams including two new SANS instruments, and 10) construction of support buildings. This paper provides a short summary of these projects including their present status and schedule. (orig.)

  13. Feasibility study of the university of Utah TRIGA reactor power upgrade - part II: Thermohydraulics and heat transfer study in respect to cooling system requirements and design

    Directory of Open Access Journals (Sweden)

    Babitz Philip

    2013-01-01

    Full Text Available The thermodynamic conditions of the University of Utah's TRIGA Reactor were simulated using SolidWorks Flow Simulation, Ansys, Fluent and PARET-ANL. The models are developed for the reactor's currently maximum operating power of 90 kW, and a few higher power levels to analyze thermohydraulics and heat transfer aspects in determining a design basis for higher power including the cost estimate. It was found that the natural convection current becomes much more pronounced at higher power levels with vortex shedding also occurring. A departure from nucleate boiling analysis showed that while nucleate boiling begins near 210 kW it remains in this state and does not approach the critical heat flux at powers up to 500 kW. Based on these studies, two upgrades are proposed for extended operation and possibly higher reactor power level. Together with the findings from Part I studies, we conclude that increase of the reactor power is highly feasible yet dependable on its purpose and associated investments.

  14. Industry perspective on digital upgrades: A utility perspective on digital upgrades

    International Nuclear Information System (INIS)

    Blauw, R.J.

    1994-01-01

    Nuclear utilities face the need to upgrade aging and obsolete safety related and other critical equipment. This is the result of operation and maintenance concerns for reliability and maintainability. Digital technology is an option for these upgrades. A number of utilities have attempted exercising the digital option. The regulatory licensing results have been inconsistent and have raised a variety of issues. These issues and the subsequent licensing uncertainties have caused some utilities to temporarily drop digital technology as an upgrade option. Resolution of these issues and the need for regulatory stability is driving the development of industry standards and guidelines. These will provide guidance to support consistent design and implementation of digital upgrades. Successful completion of these documents is necessary for renewed consideration of the use of digital technology. This paper will present a utility perspective on how project management, configuration control, and a rigorous design process can serve to address the present regulatory issues. These issues include commercial grade dedication, reliability, electromagnetic interference, and failure and error management. This perspective is consistent with the standards and guidelines development effort

  15. Design of an upgradeable 45-100 mA RFQ accelerator for FAIR

    Science.gov (United States)

    Zhang, Chuan; Schempp, Alwin

    2009-10-01

    A 325 MHz, 35 mA, 3 MeV Radio-Frequency Quadrupole (RFQ) accelerator will be operated as the first accelerating structure of the proton linac injector for the newly planned international science center Facility for Antiproton and Ion Research (FAIR) at GSI, Germany. In previous design studies, two high beam intensities, 70 and 100 mA, were used. Most recently, the design intensity has been changed to 45 mA, which is closer to the operational value. Taking advantage of the so-called New Four-Section Procedure, a new design, which is upgradable from 45 to 100 mA, has been developed for the FAIR proton RFQ. Besides the upgradability analyses, robustness studies of the new design to spatial displacements of the input beam and field errors are presented as well.

  16. Design of an upgradeable 45-100 mA RFQ accelerator for FAIR

    International Nuclear Information System (INIS)

    Zhang Chuan; Schempp, Alwin

    2009-01-01

    A 325 MHz, 35 mA, 3 MeV Radio-Frequency Quadrupole (RFQ) accelerator will be operated as the first accelerating structure of the proton linac injector for the newly planned international science center Facility for Antiproton and Ion Research (FAIR) at GSI, Germany. In previous design studies, two high beam intensities, 70 and 100 mA, were used. Most recently, the design intensity has been changed to 45 mA, which is closer to the operational value. Taking advantage of the so-called New Four-Section Procedure, a new design, which is upgradable from 45 to 100 mA, has been developed for the FAIR proton RFQ. Besides the upgradability analyses, robustness studies of the new design to spatial displacements of the input beam and field errors are presented as well.

  17. SRS control system upgrade requirements

    International Nuclear Information System (INIS)

    Hill, L.F.

    1998-01-01

    This document defines requirements for an upgrade of the Sodium Removal System (SRS) control system. The upgrade is being performed to solve a number of maintainability and operability issues. The upgraded system will provide the same functions, controls and interlocks as the present system, and in addition provide enhanced functionality in areas discussed in this document

  18. H-1 Upgrades (4BW/4BN) (H-1 Upgrades)

    Science.gov (United States)

    2015-12-01

    automatic blade fold of the new composite rotor blades, new performance matched transmissions, a new four-bladed tail rotor and drive system, upgraded...Upgrades December 2015 SAR March 18, 2016 10:59:17 UNCLASSIFIED 4 Col Steven Girard PMA-276 USMC Light/Attack Helicopter Program Executive Officer...attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance and fire support coordination

  19. Influence of the heat losses and accumulated heat upon the evolution of the thermohydraulic processes in the transients as applied to the ISB-WWER integral test facility

    International Nuclear Information System (INIS)

    Gashenko, I.V.; Melikhov, O.I.; Shmal, I.I.; Kouznetsov, V.D.

    2001-01-01

    The results of the calculational study using the RELAP5/MOD3.2 thermalhydraulic code performed on the influence of the heat losses to the ambient and the heat accumulated in the pipelines walls upon the evolution of the thermalhydraulic processes in the primary circuit of the integral test facility ISB-WWER when simulating the transients caused by the loss of the coolant are presented in the paper. (authors)

  20. Upgrading safety documentation for exported nuclear power plants

    International Nuclear Information System (INIS)

    Rosen, M.

    1978-01-01

    In view of the generally small regulatory staffs of importing countries, suggestions are given for upgrading the ''export edition'' of the traditionally supplied safety documentation by use of a Supplementary Information Report, written specifically for the needs of a smaller and/or less technically qualified staff, which would highlight the differences that exist between the facility to be constructed and the supposedly similar reference plant of the supplier country; by improvement of supporting safety documentation to allow for adequate understanding of significant safety parameters; and by attention to the needs of smaller countries in the critical operating regulations (Technical Specifications for Operation). (author)

  1. Analysis of Reactor Pressurized Thermal Shock Conditions Considering Upgrading of Systems Important to Safety

    International Nuclear Information System (INIS)

    Mazurok, A.S; Vyshemirskyij, M.P.

    2015-01-01

    The paper analyzes conditions of pressurized thermal shock on the reactor pressure vessel taking into account upgrading of the emergency core cooling system and primary overpressure protection system. For representative accident scenarios, calculation and comparative analysis was carried out. These scenarios include a small leak from the hot leg and PRZ SV stuck opening with re closure after 3600 sec and 3 SG heat transfer tube rupture. The efficiency of mass flow control by valves on the pump head (emergency core cooling systems) and cold overpressure protection (primary overpressure protection system) was analyzed. The thermal hydraulic model for RELAP5/Mod3.2 code with detailed downcomer (DC) model and changes in accordance with upgrades was used for calculations. Detailed (realistic) modeling of piping and equipment was performed. The upgrades prevent excessive primary cooling and, consequently, help to preserve the RPV integrity and to avoid the formation of a through crack, which can lead to a severe accident

  2. LHC luminosity upgrade detector challenges

    CERN Multimedia

    CERN. Geneva; de Roeck, Albert; Bortoletto, Daniela; Wigmans, Richard; Riegler, Werner; Smith, Wesley H

    2006-01-01

    LHC luminosity upgrade: detector challenges The upgrade of the LHC machine towards higher luminosity (1035 cm -2s-1) has been studied over the last few years. These studies have investigated scenarios to achieve the increase in peak luminosity by an order of magnitude, as well as the physics potential of such an upgrade and the impact of a machine upgrade on the LHC DETECTORS. This series of lectures will cover the following topics: • Physics motivation and machine scenarios for an order of magnitude increase in the LHC peak luminosity (lecture 1) • Detector challenges including overview of ideas for R&D programs by the LHC experiments: tracking and calorimetry, other new detector developments (lectures 2-4) • Electronics, trigger and data acquisition challenges (lecture 5) Note: the much more ambitious LHC energy upgrade will not be covered

  3. Heat transfer on HLM cooled wire-spaced fuel pin bundle simulator in the NACIE-UP facility

    Energy Technology Data Exchange (ETDEWEB)

    Di Piazza, Ivan, E-mail: ivan.dipiazza@enea.it [Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Camugnano (Italy); Angelucci, Morena; Marinari, Ranieri [University of Pisa, Dipartimento di Ingegneria Civile e Industriale, Pisa (Italy); Tarantino, Mariano [Italian National Agency for New Technologies, Energy and Sustainable Economic Development, C.R. ENEA Brasimone, Camugnano (Italy); Forgione, Nicola [University of Pisa, Dipartimento di Ingegneria Civile e Industriale, Pisa (Italy)

    2016-04-15

    Highlights: • Experiments with a wire-wrapped 19-pin fuel bundle cooled by LBE. • Wall and bulk temperature measurements at three axial positions. • Heat transfer and error analysis in the range of low mass flow rates and Péclet number. • Comparison of local and section-averaged Nusselt number with correlations. - Abstract: The NACIE-UP experimental facility at the ENEA Brasimone Research Centre (Italy) allowed to evaluate the heat transfer coefficient of a wire-spaced fuel bundle cooled by lead-bismuth eutectic (LBE). Lead or lead-bismuth eutectic are very attractive as coolants for the GEN-IV fast reactors due to the good thermo-physical properties and the capability to fulfil the GEN-IV goals. Nevertheless, few experimental data on heat transfer with heavy liquid metals (HLM) are available in literature. Furthermore, just a few data can be identified on the specific topic of wire-spaced fuel bundle cooled by HLM. Additional analysis on thermo-fluid dynamic behaviour of the HLM inside the subchannels of a rod bundle is necessary to support the design and safety assessment of GEN. IV/ADS reactors. In this context, a wire-spaced 19-pin fuel bundle was installed inside the NACIE-UP facility. The pin bundle is equipped with 67 thermocouples to monitor temperatures and analyse the heat transfer behaviour in different sub-channels and axial positions. The experimental campaign was part of the SEARCH FP7 EU project to support the development of the MYRRHA irradiation facility (SCK-CEN). Natural and mixed circulation flow regimes were investigated, with subchannel Reynolds number in the range Re = 1000–10,000 and heat flux in the range q″ = 50–500 kW/m{sup 2}. Local Nusselt numbers were calculated for five sub-channels in different ranks at three axial positions. Section-averaged Nusselt number was also defined and calculated. Local Nusselt data showed good consistency with some of the correlation existing in literature for heat transfer in liquid metals

  4. Heat transfer on HLM cooled wire-spaced fuel pin bundle simulator in the NACIE-UP facility

    International Nuclear Information System (INIS)

    Di Piazza, Ivan; Angelucci, Morena; Marinari, Ranieri; Tarantino, Mariano; Forgione, Nicola

    2016-01-01

    Highlights: • Experiments with a wire-wrapped 19-pin fuel bundle cooled by LBE. • Wall and bulk temperature measurements at three axial positions. • Heat transfer and error analysis in the range of low mass flow rates and Péclet number. • Comparison of local and section-averaged Nusselt number with correlations. - Abstract: The NACIE-UP experimental facility at the ENEA Brasimone Research Centre (Italy) allowed to evaluate the heat transfer coefficient of a wire-spaced fuel bundle cooled by lead-bismuth eutectic (LBE). Lead or lead-bismuth eutectic are very attractive as coolants for the GEN-IV fast reactors due to the good thermo-physical properties and the capability to fulfil the GEN-IV goals. Nevertheless, few experimental data on heat transfer with heavy liquid metals (HLM) are available in literature. Furthermore, just a few data can be identified on the specific topic of wire-spaced fuel bundle cooled by HLM. Additional analysis on thermo-fluid dynamic behaviour of the HLM inside the subchannels of a rod bundle is necessary to support the design and safety assessment of GEN. IV/ADS reactors. In this context, a wire-spaced 19-pin fuel bundle was installed inside the NACIE-UP facility. The pin bundle is equipped with 67 thermocouples to monitor temperatures and analyse the heat transfer behaviour in different sub-channels and axial positions. The experimental campaign was part of the SEARCH FP7 EU project to support the development of the MYRRHA irradiation facility (SCK-CEN). Natural and mixed circulation flow regimes were investigated, with subchannel Reynolds number in the range Re = 1000–10,000 and heat flux in the range q″ = 50–500 kW/m"2. Local Nusselt numbers were calculated for five sub-channels in different ranks at three axial positions. Section-averaged Nusselt number was also defined and calculated. Local Nusselt data showed good consistency with some of the correlation existing in literature for heat transfer in liquid metals for

  5. The LHCb Muon Upgrade

    CERN Multimedia

    Cardini, A

    2013-01-01

    The LHCb collaboration is currently working on the upgrade of the experiment to allow, after 2018, an efficient data collection while running at an instantaneous luminosity of 2x10$^{33}$/cm$^{-2}$s$^{-1}$. The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. The muon system will be upgraded in two phases. In the first phase, the off-detector readout electronics will be redesigned to allow complete event readout at 40 MHz. Also, part of the channel logical-ORs, used to reduce the total readout channel count, will be removed to reduce dead-time in critical regions. In a second phase, higher-granularity detectors will replace the ones installed in highly irradiated regions, to guarantee efficient muon system performances in the upgrade data taking conditions.

  6. Upgrader alley : oil sands fever strikes Edmonton

    International Nuclear Information System (INIS)

    Griffiths, M.; Dyer, S.

    2008-01-01

    Large-scale industrial complexes called upgraders are similar to oil refineries. Several upgraders are planned for the area just northeast of Edmonton, known as Upgrader Alley. Concerns have been expressed over the potential congestion and environmental impacts of these upgraders. Upgraders will also attract other industry, and the cumulative effects of development will have major impacts on the region, its people and the natural environment. The report provided an overview of Upgrader Alley, with reference to what is driving development; upgrading issues; what Upgrader Alley will look like; and how much water Upgrader Alley needs. The report also discussed impacts on the land, air quality, and greenhouse gases. Water demand issues were discussed with reference to impacts on the North Saskatchewan River, water levels, water quality, a water management framework, and groundwater resources. Cumulative impacts were also presented. It was concluded that if all the projects for which applications had been submitted were approved, the rapid pace of growth in Upgrader Alley would mimic that of Fort McMurray. If the rate of development were somewhat slower, there would be more time to develop and implement plans to reduce the impacts. 189 refs., 6 tabs., 14 figs

  7. Upgrade of the Control System of the IFUNAM's Pelletron Accelerator

    OpenAIRE

    Macias, R.; Chavez, E.; Ortiz, M. E.; Lopez, K.; Huerta, A.; Verde, M. C.

    2001-01-01

    In 1995 a 9SDH-2 Pelletron from NEC was installed at IFUNAM (Instituto de Fisica, Universidad Nacional Autonoma de Mexico). Two beam lines have been operational since then and two new lines have been built. In order to perform the planned projects in this grown facility, an upgrading of the original manual control system is required. The proposed new control system takes advantage of the existing devices and incorporates the electronics needed for the newer beam lines. The control software fr...

  8. Biogas as a renewable energy fuel – A review of biogas upgrading, utilisation and storage

    International Nuclear Information System (INIS)

    Ullah Khan, Imran; Hafiz Dzarfan Othman, Mohd; Hashim, Haslenda; Matsuura, Takeshi; Ismail, A.F.; Rezaei-DashtArzhandi, M.; Wan Azelee, I.

    2017-01-01

    Highlights: • It is attempted to provide critical considerations on various biogas upgrading techniques. • Membrane is an environmentally and economically sound technique for purification. • Purified biogas in compressed form is a substitute of compressed natural gas for vehicles. • Charged mass and compressor input work are the most important factors for storage. - Abstract: Biogas upgrading is a widely studied and discussed topic and its utilisation as a natural gas substitute has gained a significant attention in recent years. The production of biomethane provides a versatile application in both heat and power generation and as a vehicular fuel. This paper systematically reviews the state of the art of biogas upgrading technologies with upgrading efficiency, methane (CH 4 ) loss, environmental effect, development and commercialisation, and challenges in terms of energy consumption and economic assessment. The market situation for biogas upgrading has changed rapidly in recent years, making the membrane separation gets significant market share with traditional biogas upgrading technologies. In addition, the potential utilisation of biogas, efficient conversion into bio-compressed natural gas (bio-CNG), and storage systems are investigated in depth. Two storing systems for bio-CNG at filling stations, namely buffer and cascade storage systems are used. The best storage system should be selected on the basis of the advantages of both systems. Also, the fuel economy and mass emissions for bio-CNG and CNG filled vehicles are studied. There is the same fuel economy and less carbon dioxide (CO 2 ) emission for bio-CNG. Based on the results of comparisons between the technical features of upgrading technologies, various specific requirements for biogas utilisation and the relevant investment, and operating and maintenance costs, future recommendations are made for biogas upgrading.

  9. Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans

    Science.gov (United States)

    Barnes, M. J.; Adraktas, A.; Bregliozzi, G.; Goddard, B.; Ducimetière, L.; Salvant, B.; Sestak, J.; Vega Cid, L.; Weterings, W.; Vallgren, C. Yin

    2017-07-01

    During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An extensive program of studies was launched and significant upgrades were carried out during Long Shutdown 1 (LS 1). These upgrades included a new design of beam screen to reduce both beam coupling impedance of the kicker magnet and the electric field associated with the screen conductors, hence decreasing the probability of electrical breakdown in this region. This paper presents operational experience of the injection kicker magnets during the first years of Run 2 of the LHC, including a discussion of faults and kicker magnet issues that limited LHC operation. In addition, in light of these issues, plans for further upgrades are briefly discussed.

  10. Common cause analysis of the TREAT upgrade reactor protection system

    Energy Technology Data Exchange (ETDEWEB)

    Page, R.J.; Kamis, G.J.; Marbach, R.A.; Mueller, C.J.

    1984-09-01

    A triply redundant reactor scram system (RSS) has been designed for the upgraded TREAT facility. The independent failures reliability goal for the RSS is <10/sup -9/ failures per demand. An independent failures analysis indicated that this goal would be met. In addition, however, recognizing that in heavily redundant systems common-cause failures dominate, a common cause analysis of the TREAT upgrade RSS was done. The objective was to identify those common-cause initiators which could affect the functioning of the RSS, and to subsequently modify the design of the RSS so that the effect was minimized. A number of common-cause initiators were identified which were capable of defeating the triple redundancy feature of the reactor scram system. By means of a systematic analysis of the effect these initiators could have on the system, it was possible to identify seven necessary design and procedural modifications that would greatly reduce the probability of the reactor being run while the RSS was in a faulted condition.

  11. Design upgrade of the ISOLDE target unit for HIE-ISOLDE

    CERN Document Server

    Montano, J; Gottberg, A

    2013-01-01

    The High Intensity and Energy HIE-ISOLDE project is a major upgrade of the existing ISOLDE and REX-ISOLDE facilities with the objective of increasing the energy and the intensity of the delivered radioactive ion beams (RIB) {[}1]. In order to accommodate the future increase of primary beam intensity delivered by the new LINAC4 H- driver to the Proton Synchrotron Booster (PSB) {[}2] and from this to ISOLDE, a major study is being carried out to upgrade the existing designs of the ISOLDE target and its supporting infrastructure. In particular, the extraction optics plays an important role in the initial beam transport and the quality of the beam supplied to the mass separators. Important factors include the emittance of the beam and the beam profile to avoid beam losses. A new double electrode extraction system has been developed for simplifying and improving the interface between the target unit and the frontend (target coupling table). Numerical and experimental studies have been performed in order to define ...

  12. Setting priorities for safeguards upgrades

    International Nuclear Information System (INIS)

    Al-Ayat, R.A.; Judd, B.R.; Patenaude, C.J.; Sicherman, A.

    1987-01-01

    This paper describes an analytic approach and a computer program for setting priorities among safeguards upgrades. The approach provides safeguards decision makers with a systematic method for allocating their limited upgrade resources. The priorities are set based on the upgrades cost and their contribution to safeguards effectiveness. Safeguards effectiveness is measured by the probability of defeat for a spectrum of potential insider and outsider adversaries. The computer program, MI$ER, can be used alone or as a companion to ET and SAVI, programs designed to evaluate safeguards effectiveness against insider and outsider threats, respectively. Setting the priority required judgments about the relative importance (threat likelihoods and consequences) of insider and outsider threats. Although these judgments are inherently subjective, MI$ER can analyze the sensitivity of the upgrade priorities to these weights and determine whether or not they are critical to the priority ranking. MI$ER produces tabular and graphical results for comparing benefits and identifying the most cost-effective upgrades for a given expenditure. This framework provides decision makers with an explicit and consistent analysis to support their upgrades decisions and to allocate the safeguards resources in a cost-effective manner

  13. Software and man-machine interface considerations for a nuclear plant computer replacement and upgrade project

    International Nuclear Information System (INIS)

    Diamond, G.; Robinson, E.

    1984-01-01

    Some of the key software functions and Man-Machine Interface considerations in a computer replacement and upgrade project for a nuclear power plant are described. The project involves the installation of two separate computer systems: an Emergency Response Facilities Computer System (ERFCS) and a Plant Process Computer System (PPCS). These systems employ state-of-the-art computer hardware and software. The ERFCS is a new system intended to provide enhanced functions to meet NRC post-TMI guidelines. The PPCS is intended to replace and upgrade an existing obsolete plant computer system. A general overview of the hardware and software aspects of the replacement and upgrade is presented. The work done to develop the upgraded Man-Machine Interface is described. For the ERFCS, a detailed discussion is presented of the work done to develop logic to evaluate the readiness and performance of safety systems and their supporting functions. The Man-Machine Interface considerations of reporting readiness and performance to the operator are discussed. Finally, the considerations involved in the implementation of this logic in real-time software are discussed.. For the PPCS, a detailed discussion is presented of some new features

  14. Further improvement for {sup 10}Be measurement on an upgraded compact AMS radiocarbon facility

    Energy Technology Data Exchange (ETDEWEB)

    Fu, Dongpo; Ding, Xingfang [State Key Laboratory of Nuclear Physics and Technology and Institute of Heavy Ion Physics, Peking University, Beijing 100871,China (China); Liu, Kexin, E-mail: kxliu@pku.edu.cn [State Key Laboratory of Nuclear Physics and Technology and Institute of Heavy Ion Physics, Peking University, Beijing 100871,China (China); Müller, Arnold Milenko; Suter, Martin; Christl, Marcus [Laboratory of Ion Beam Physics, ETH Zürich, 8093 Zürich (Switzerland); Zhou, Liping [Department of Geography, Peking University, Beijing 100871 (China); Synal, Hans-Arno [Laboratory of Ion Beam Physics, ETH Zürich, 8093 Zürich (Switzerland)

    2015-10-15

    The Peking University 500 kV NEC compact AMS radiocarbon facility (PKU-CAMS) has been modified in order to have additionally the possibility to measure {sup 10}Be. In the preliminary experiment a silicon nitride foil was mounted in front of the electrostatic deflector as passive boron degrader, and the original Si detector for radiocarbon detection was replaced by an ETHZ-designed high-resolution ΔE − E{sub res} gas ionization chamber (GIC) for {sup 10}Be identification. This simple arrangement has yielded an overall {sup 10}Be transmission of 2.2% and a {sup 10}Be/{sup 9}Be background level of 3.5 × 10{sup −14}. To further reduce the background and increase the transmission by re-focusing the {sup 10}Be ions, an additional 90° bending magnet with 350 mm radius was installed after the electrostatic deflector. The silicon detector was shifted slightly relative to its position of original NEC system setup in opposite direction of beam and can be lifted up manually without breaking vacuum when {sup 10}Be measurements are carried out. In this way the system can be easily and fast set up for {sup 10}Be without affecting any parameters for radiocarbon measurement. The gas detector for {sup 10}Be was mounted at the end of the beam line after the additional magnet. The lay-out of the upgraded spectrometer is very compact and does not require more space than the original instrument. Using this compact setup, the overall transmission for {sup 10}Be was doubled to 5–6% and the {sup 10}Be/{sup 9}Be background level was reduced to radios as low as 2.4 × 10{sup −15}.

  15. Reversible heat pump and heat recovery; Pac reversible et recuperation de chaleur

    Energy Technology Data Exchange (ETDEWEB)

    Laurent, M.

    1998-10-01

    The development of a tights making up workshop with controlled atmosphere in the Bresson and Rande factory (Vigan, Gard, France) has led to a revision and to an upgrading of the power installation of the factory. The 198 knitting machines require an ambient air with a 23 {+-} 2 deg. C temperature and a 65% {+-} 3% humidity level. Cold and hot water production for the supply of the air treatment plant is ensured by a reversible heat pump with a heat recovery system for the limitation of power needs. (J.S.)

  16. Upgrading low-boiling-fraction fast pyrolysis bio-oil using supercritical alcohol: Understanding alcohol participation, chemical composition, and energy efficiency

    International Nuclear Information System (INIS)

    Jo, Heuntae; Prajitno, Hermawan; Zeb, Hassan; Kim, Jaehoon

    2017-01-01

    Highlights: • Non-catalytic and non-hydrogen based bio-oil upgrading was conducted using scMeOH. • 16–40 wt% alcohols were consumed during the upgrading. • High bio-oil yield of 78.4 wt% and low TAN of 4.0 mg KOH/g were achieved. • Effect of supercritical alcohols, reaction times, temperature and bio-oil concentration was conducted. • scMeOH upgrading has good energy recovery (ER) and energy efficiency (EE) compared with scEtOH and scIPA. - Abstract: Herein, a supercritical methanol (scMeOH) route for efficient upgrading of the low-boiling fraction of fast pyrolysis bio-oil containing a large amount of low-molecular-weight acids and water was investigated. The effects of various reaction parameters, including the temperature, concentration, and time, were explored. The yield of bio-oil and the energy efficiency of the scMeOH upgrading process were determined based on the amount of methanol that participated in the reaction during upgrading and fractionation of the upgraded heavy-fraction bio-oils (UHBOs) and upgraded light-fraction bio-oils (ULBOs). Upgrading at 400 °C with 9.1 wt% bio-oil for 30 min generated a high bio-oil yield of 78.4 wt% with a low total acid number (TAN) of 4.0 mg-KOH/g-oil and a higher heating value of 29.9 MJ kg −1 . The energy recovery (ER) was 94–131% and the energy efficiency (EE) was in the range of 79–109% depending on the calorific values of the ULBOs. Compared with upgrading in supercritical ethanol and supercritical isopropanol, less alcohol participation, a lower TAN, and higher ER and EE were achieved with scMeOH upgrading. Plausible pathways for bio-oil upgrading in supercritical alcohols based on detailed compositional analysis of the UHBO, ULBO, and gaseous products were discussed.

  17. High rate tests of the LHCb RICH Upgrade system

    CERN Multimedia

    Blago, Michele Piero

    2016-01-01

    One of the biggest challenges for the upgrade of the LHCb RICH detectors from 2020 is to readout the photon detectors at the full 40 MHz rate of the LHC proton-proton collisions. A test facility has been setup at CERN with the purpose to investigate the behaviour of the Multi Anode PMTs, which have been proposed for the upgrade, and their readout electronics at high trigger rates. The MaPMTs are illuminated with a monochromatic laser that can be triggered independently of the readout electronics. A first series of tests, including threshold scans, is performed at low trigger rates (20 kHz) for both the readout and the laser with the purpose to characterise the behaviour of the system under test. Then the trigger rate is increased in two separate steps. First the MaPMTs are exposed to high illumination by triggering the pulsed laser at a high (20 MHz) repetition rate while the DAQ is readout at the same low rate as before. In this way the performance of the MaPMTs and the attached electronics can be evaluated ...

  18. Performance analysis of an integrated energy storage and energy upgrade thermochemical solid–gas sorption system for seasonal storage of solar thermal energy

    International Nuclear Information System (INIS)

    Li, Tingxian; Wang, Ruzhu; Kiplagat, Jeremiah K.; Kang, YongTae

    2013-01-01

    An innovative dual-mode thermochemical sorption energy storage method is proposed for seasonal storage of solar thermal energy with little heat losses. During the charging phase in summer, solar thermal energy is stored in form of chemical bonds resulting from thermochemical decomposition process, which enables the stored energy to be kept several months at ambient temperature. During the discharging phase in winter, the stored thermal energy is released in the form of chemical reaction heat resulting from thermochemical synthesis process. Thermodynamic analysis showed that the advanced dual-mode thermochemical sorption energy storage is an effective method for the long-term seasonal storage of solar energy. A coefficient of performance (COP h ) of 0.6 and energy density higher than 1000 kJ/kg of salt can be attained from the proposed system. During the discharging phase at low ambient temperatures, the stored thermal energy can be upgraded by use of a solid–gas thermochemical sorption heat transformer cycle. The proposed thermochemical sorption energy storage has distinct advantages over the conventional sensible heat and latent heat storage, such as higher energy storage density, little heat losses, integrated energy storage and energy upgrade, and thus it can contribute to improve the seasonal utilization of solar thermal energy. - Highlights: ► A dual-mode solid thermochemical sorption is proposed for seasonal solar thermal energy storage. ► Energy upgrade techniques into the energy storage system are integrated. ► Performance of the proposed seasonal energy storage system is evaluated. ► Energy density and COP h from the proposed system are as high as 1043 kJ/kg of salt and 0.60, respectively

  19. ATR Technical Specification Upgrade Program

    International Nuclear Information System (INIS)

    McCracken, R.T.; Durney, J.L.; Freund, G.A.

    1990-01-01

    The Advanced Test Reactor (ATR) is a 250 MW, uranium-aluminum fueled test reactor which began full power operation in 1969. The initial operation was controlled by an Operating Limits document based on the original Safety Analysis Report. Additional safety bases were later developed to support Technical Specifications which were approved and implemented in 1977. The Technical Specifications which were initially developed with content and format specified in ANSI/ANS--15.1, ''The Development of Technical Specifications for Research Reactors.'' The safety basis documentation and the Technical Specifications have been updated as required to maintain them current with the ATR facility configuration. All revisions have been made with a content, format and style consistent with the original. A major, two-phase program to upgrade the content, format and style is in progress. This paper describes the first phase of this program

  20. LLNL superconducting magnets test facility

    Energy Technology Data Exchange (ETDEWEB)

    Manahan, R; Martovetsky, N; Moller, J; Zbasnik, J

    1999-09-16

    The FENIX facility at Lawrence Livermore National Laboratory was upgraded and refurbished in 1996-1998 for testing CICC superconducting magnets. The FENIX facility was used for superconducting high current, short sample tests for fusion programs in the late 1980s--early 1990s. The new facility includes a 4-m diameter vacuum vessel, two refrigerators, a 40 kA, 42 V computer controlled power supply, a new switchyard with a dump resistor, a new helium distribution valve box, several sets of power leads, data acquisition system and other auxiliary systems, which provide a lot of flexibility in testing of a wide variety of superconducting magnets in a wide range of parameters. The detailed parameters and capabilities of this test facility and its systems are described in the paper.

  1. CFD Analyses on LHe Cooling for SCQ Magnets in BEPCII Upgrade

    International Nuclear Information System (INIS)

    He, Z.H.; Wang, L.; Tang, H.M.; Zhang, X.B.; Jia, L.X.

    2004-01-01

    A pair of superconducting interaction region quadrupole magnets in Beijing Electron-Positron Collider Upgrade (BEPCII) are to be cooled by supercritical helium in order to eliminate the flow instabilities in the constrained cooling channels. The fluid flow is simulated by the commercial computational dynamics fluid software. The heat loads to the superconducting quadrupole (SCQ) magnets from the radiation shields at 80 K and from the thermal conduction of mechanical supports are considered. The temperature distribution of the fluid in the liquid helium cooling channels, and the heat transfer in the SCQ magnet and by its supports are presented. The influence of mass flow rate on pressure drop in the cooling passage is analyzed

  2. TPE upgrade for enhancing operational safety and improving in-vessel tritium inventory assessment in fusion nuclear environment

    Energy Technology Data Exchange (ETDEWEB)

    Shimada, M., E-mail: Masashi.Shimada@inl.gov [Fusion Safety Program, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Taylor, C.N.; Moore-McAteer, L.; Pawelko, R.J. [Fusion Safety Program, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Kolasinski, R.D.; Buchenauer, D.A. [Sandia National Laboratories, Hydrogen and Materials Science Department, Livermore, CA 94550 (United States); Cadwallader, L.C.; Merrill, B.J. [Fusion Safety Program, Idaho National Laboratory, Idaho Falls, ID 83415 (United States)

    2016-11-01

    The Tritium Plasma Experiment (TPE) is a unique high-flux linear plasma device that can handle beryllium, tritium, and neutron-irradiated plasma facing materials, and is the only existing device dedicated to evaluate in-vessel tritium inventory in the nuclear environment for fusion safety. The electrical upgrade were recently carried out to enhance operational safety and to improve plasma performance. New DC power supplies and a new control center enable remote plasma operations from outside of the contamination area for tritium, minimizing the possible exposure risk with tritium and beryllium and eliminating heat stress issue. In November 2015, the TPE successfully achieved first deuterium plasma via remote operation after a significant three-year upgrade. Simple linear scaling estimate showed that the TPE is expected to achieve Γ{sub i}{sup max} of >1.0 × 10{sup 23} m{sup −2} s{sup −1} and q{sub heat} of >1 MW m{sup −2} with new power supplies. This upgrade not only improves operational safety of the worker, but also enhances plasma performance to better simulate extreme plasma-material conditions expected in ITER, FNSF, and DEMO for improving in-vessel tritium inventory assessment in fusion nuclear environment.

  3. A modular approach to inverse modelling of a district heating facility with seasonal thermal energy storage

    DEFF Research Database (Denmark)

    Tordrup, Karl Woldum; Poulsen, Uffe Vestergaard; Nielsen, Carsten

    2017-01-01

    We use a modular approach to develop a TRNSYS model for a district heating facility by applying inverse modelling to one year of operational data for individual components. We assemble the components into a single TRNSYS model for the full system using the accumulation tanks as a central hub conn...

  4. Fault tree analysis of Project S-4404, Upgrade Canyon Exhaust System

    International Nuclear Information System (INIS)

    Browne, E.V.; Low, J.M.; Lux, C.R.

    1992-01-01

    Project S-4404, Upgrade Canyon Exhaust Systems, is a $177 million project with the purpose of upgrading the Exhaust Systems for both F and H Canyon Facilities. This upgrade will replace major portions of the F and H-Canyon exhaust systems, downstream of their respective sand filters with higher capacity and more reliable systems. Because of the high cost, DOE requested Program Control ampersand Integration (PC ampersand I) to examine specific deletions to the project. PC ampersand I requested Nuclear Processes Safety Research (NPSR) to perform an analysis to compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed exhaust system and specific proposed exhaust system alternatives. The objective of this work was to perform an analysis and compare failure rates for the existing F ampersand H Canyon exhaust systems with the proposed project exhaust system and proposed project alternatives. Based on fault tree analysis, two conclusions are made. First, D ampersand D activities can be eliminated from the project with no significant decrease to exhaust system safety. Deletion of D ampersand D activities would result in a cost savings of $29 million. Second, deletion of DOE Order 6430.1A requirements regarding DBAs would decrease exhaust system safety by a factor of 12

  5. Pipeline transportation of emerging partially upgraded bitumen

    International Nuclear Information System (INIS)

    Luhning, R.W.; Anand, A.; Blackmore, T.; Lawson, D.S.

    2002-01-01

    The recoverable reserves of Canada's vast oil deposits is estimated to be 335 billion barrels (bbl), most of which are in the Alberta oil sands. Canada was the largest import supplier of crude oil to the United States in 2001, followed by Saudi Arabia. By 2011, the production of oil sands is expected to increase to 50 per cent of Canada's oil, and conventional oil production will decline as more production will be provided by synthetic light oil and bitumen. This paper lists the announced oil sands projects. If all are to proceed, production would reach 3,445,000 bbl per day by 2011. The three main challenges regarding the transportation and marketing of this new production were described. The first is to expand the physical capacity of existing pipelines. The second is the supply of low viscosity diluent (such as natural gas condensate or synthetic diluent) to reduce the viscosity and density of the bitumen as it passes through the pipelines. The current pipeline specifications and procedures to transport partially upgraded products are presented. The final challenge is the projected refinery market constraint to process the bitumen and synthetic light oil into consumer fuel products. These challenges can be addressed by modifying refineries and increasing Canadian access in Petroleum Administration Defense District (PADD) II and IV. The technology for partial upgrading of bitumen to produce pipeline specification oil, reduce diluent requirements and add sales value, is currently under development. The number of existing refineries to potentially accept partially upgraded product is listed. The partially upgraded bitumen will be in demand for additional upgrading to end user products, and new opportunities will be presented as additional pipeline capacity is made available to transport crude to U.S. markets and overseas. The paper describes the following emerging partial upgrading methods: the OrCrude upgrading process, rapid thermal processing, CPJ process for

  6. Main Control Room Upgrade for Kori Unit 1 in Korea

    International Nuclear Information System (INIS)

    Ha, Jae Taeg; Choi, Moon Jae

    2014-01-01

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles

  7. Main Control Room Upgrade for Kori Unit 1 in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Ha, Jae Taeg; Choi, Moon Jae [KEPCO, Daejeon (Korea, Republic of)

    2014-08-15

    Kori Unit 1 is a 30 years old nuclear power plant and its MCR and MCB was upgraded based on the latest Human Factors Engineering (HFE) principles. The objectives of applying the Human Factors Engineering (HFE) principles are to minimize the human errors and to enhance the safe operation of the plant. In order to systematically incorporate the HFE design principles into the Human System Interface (HSI) design, HFE Program Plan (HFEPP) for Kori Unit 1 was developed and the plan provided an overview of the HSI design process along with detailed methods and results. The upgrade includes addition of Bypassed and Inoperable Status Indication System (BISI) and the replacement of the conventional MMI devices such as hardwired hand switches, recorders and indicators with new advanced control and display devices using VDUs (Video Display Units). The VDUs significantly improve the effectiveness and efficiency of the monitoring function. Plant Monitoring System (PMS) and Plant Annunciator System (PAS) were upgraded also by replacing the outdated systems with advanced digital systems with future expansion capability. In addition, the MCR related equipment and/or facilities were replaced or improved. Some of these include the enhancement of MCR interior designs for better working environment, dimmable ceiling lighting, aesthetically pleasing decor of ceiling, wall and floor as well as ergonomically improved operator consoles.

  8. Perimeter security for Minnesota correctional facilities

    Energy Technology Data Exchange (ETDEWEB)

    Crist, D. [Minnesota Department of Corrections, St. Paul, MN (United States); Spencer, D.D. [Sandia National Labs., Albuquerque, NM (United States)

    1996-12-31

    For the past few years, the Minnesota Department of Corrections, assisted by Sandia National Laboratories, has developed a set of standards for perimeter security at medium, close, and maximum custody correctional facilities in the state. During this process, the threat to perimeter security was examined and concepts about correctional perimeter security were developed. This presentation and paper will review the outcomes of this effort, some of the lessons learned, and the concepts developed during this process and in the course of working with architects, engineers and construction firms as the state upgraded perimeter security at some facilities and planned new construction at other facilities.

  9. The ASDEX upgrade digital video processing system for real-time machine protection

    Energy Technology Data Exchange (ETDEWEB)

    Drube, Reinhard, E-mail: reinhard.drube@ipp.mpg.de [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Neu, Gregor [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany); Cole, Richard H.; Lüddecke, Klaus [Unlimited Computer Systems GmbH, Seeshaupterstr. 15, 82393 Iffeldorf (Germany); Lunt, Tilmann; Herrmann, Albrecht [Max-Planck-Institut für Plasmaphysik, EURATOM Association, Boltzmannstr. 2, 85748 Garching (Germany)

    2013-11-15

    Highlights: • We present the Real-Time Video diagnostic system of ASDEX Upgrade. • We show the implemented image processing algorithms for machine protection. • The way to achieve a robust operating multi-threading Real-Time system is described. -- Abstract: This paper describes the design, implementation, and operation of the Video Real-Time (VRT) diagnostic system of the ASDEX Upgrade plasma experiment and its integration with the ASDEX Upgrade Discharge Control System (DCS). Hot spots produced by heating systems erroneously or accidentally hitting the vessel walls, or from objects in the vessel reaching into the plasma outer border, show up as bright areas in the videos during and after the reaction. A system to prevent damage to the machine by allowing for intervention in a running discharge of the experiment was proposed and implemented. The VRT was implemented on a multi-core real-time Linux system. Up to 16 analog video channels (color and b/w) are acquired and multiple regions of interest (ROI) are processed on each video frame. Detected critical states can be used to initiate appropriate reactions – e.g. gracefully terminate the discharge. The system has been in routine operation since 2007.

  10. Heat transfer characteristics evaluation of heat exchangers of mock-up test facility with full-scale reaction tube for HTTR hydrogen production system (Contract research)

    International Nuclear Information System (INIS)

    Shimizu, Akira; Ohashi, Hirofumi; Kato, Michio; Hayashi, Koji; Aita, Hideki; Nishihara, Tetsuo; Inaba, Yoshitomo; Takada, Shoji; Morisaki, Norihiro; Sakaki, Akihiro; Maeda, Yukimasa; Sato, Hiroyuki; Inagaki, Yoshiyuki; Hanawa, Hiromi; Fujisaki, Katsuo; Yonekawa, Hideo

    2005-06-01

    Connection of hydrogen production system by steam reforming of methane to the High Temperature Engineering Test Reactor (HTTR) of the Japan Atomic Energy Research Institute (JAERI) has been surveyed until now. Mock-up test facility of this steam reforming system with full-scale reaction tube was constructed in FY 2001 and hydrogen of 120 Nm 3 /h was successfully produced in overall performance test. Totally 7 times operational tests were performed from March 2002 to December 2004. A lot of operational test data on heat exchanges were obtained in these tests. In this report specifications and structures of steam reformer, steam superheater, steam generator, condenser, helium gas cooler, feed gas heater and feed gas superheater were described. Heat transfer correlation equations for inside and outside tube were chosen from references. Spreadsheet programs were newly made to evaluate heat transfer characteristics from measured test data such as inlet and outlet temperature pressure and flow-rate. Overall heat-transfer coefficients obtained from the experimental data were compared and evaluated with the calculated values with heat transfer correlation equation. As a result, actual measurement values of all heat exchangers gave close agreement with the calculated values with correlation equations. Thermal efficiencies of the heat exchangers were adequate as they were well accorded with design value. (author)

  11. High Energy Antimatter Telescope (HEAT) Balloon Experiment

    Science.gov (United States)

    Beatty, J. J.

    1995-01-01

    This grant supported our work on the High Energy Antimatter Telescope(HEAT) balloon experiment. The HEAT payload is designed to perform a series of experiments focusing on the cosmic ray positron, electron, and antiprotons. Thus far two flights of the HEAT -e+/- configuration have taken place. During the period of this grant major accomplishments included the following: (1) Publication of the first results of the 1994 HEAT-e+/- flight in Physical Review Letters; (2) Successful reflight of the HEAT-e+/- payload from Lynn Lake in August 1995; (3) Repair and refurbishment of the elements of the HEAT payload damaged during the landing following the 1995 flight; and (4) Upgrade of the ground support equipment for future flights of the HEAT payload.

  12. An Experimental Facility to Validate Ground Source Heat Pump Optimisation Models for the Australian Climate

    Directory of Open Access Journals (Sweden)

    Yuanshen Lu

    2017-01-01

    Full Text Available Ground source heat pumps (GSHPs are one of the most widespread forms of geothermal energy technology. They utilise the near-constant temperature of the ground below the frost line to achieve energy-efficiencies two or three times that of conventional air-conditioners, consequently allowing a significant offset in electricity demand for space heating and cooling. Relatively mature GSHP markets are established in Europe and North America. GSHP implementation in Australia, however, is limited, due to high capital price, uncertainties regarding optimum designs for the Australian climate, and limited consumer confidence in the technology. Existing GSHP design standards developed in the Northern Hemisphere are likely to lead to suboptimal performance in Australia where demand might be much more cooling-dominated. There is an urgent need to develop Australia’s own GSHP system optimisation principles on top of the industry standards to provide confidence to bring the GSHP market out of its infancy. To assist in this, the Queensland Geothermal Energy Centre of Excellence (QGECE has commissioned a fully instrumented GSHP experimental facility in Gatton, Australia, as a publically-accessible demonstration of the technology and a platform for systematic studies of GSHPs, including optimisation of design and operations. This paper presents a brief review on current GSHP use in Australia, the technical details of the Gatton GSHP facility, and an analysis on the observed cooling performance of this facility to date.

  13. The ALICE Inner Tracking System Upgrade

    CERN Document Server

    Siddhanta, Sabyasachi

    2015-01-01

    The long term plan of ALICE (A Large Ion Collider Experiment) at the CERN Large Hadron Collider (LHC) is a detailed investigation and characterisation of the Quark-Gluon Plasma (QGP). ALICE has devised a comprehensive upgrade strategy to enhance its physics capabilities and to exploit the LHC running conditions after the second long shutdown of the LHC scheduled in 2019-20. The upgraded ALICE will focus on high precision measurements of rare probes over a wide range of momenta, which will significantly improve the performance with respect to the present experimental set up. The upgrade strategy is based on the fact that after LS2 LHC will progressively increase its luminosity with Pb beams eventually reaching an interaction rate of about 50 kHz. To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for...

  14. Upgraded RECOVER system - CASDAC system

    International Nuclear Information System (INIS)

    Yamamoto, Yoichi; Koyama, Kinji

    1992-03-01

    The CASDAC (Containment And Surveillance Data Authenticated Communication) system has been developed by JAERI for nuclear safeguards and physical protection of nuclear material. This system was designed and constructed as an upgraded RECOVER system, design concept of which was based on the original RECOVER system and also the TRANSEAVER system. Both of them were developed several years ago as a remote monitoring system for continual verification of security and safeguards status of nuclear material. The system consists of two subsystems, one of them is a Grand Command Center (GCC) subsystem and the other is a facility subsystem. Communication between the two subsystems is controlled through the international telephone line network. Therefore all communication data are encrypted to prevent access by an unauthorized person who may intend to make a falsification, or tapping. The facility subsystem has an appropriate measure that ensure data security and reliable operation under unattended mode of operator. The software of this system is designed so as to be easily used in other different types of computers. This report describes the outline of the CASDAC system and the results of its performance test. This work has been carried out in the framework of Japan Support Programme for Agency Safeguards (JASPAS) as a project, JA-1. (author)

  15. Measurements of the fast ion distribution during neutral beam injection and ion cyclotron heating in ATF [Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Wade, M.R.; Kwon, M.; Thomas, C.E.; Colchin, R.J.; England, A.C.; Gossett, J.M.; Horton, L.D.; Isler, R.C.; Lyon, J.F.; Rasmussen, D.A.; Rayburn, T.M.; Shepard, T.D.; Bell, G.L.; Fowler, R.H.; Morris, R.N.

    1990-01-01

    A neutral particle analyzer (NPA) with horizontal and vertical scanning capability has been used to make initial measurements of the fast ion distribution during neutral beam injection (NBI) and ion cyclotron heating (ICH) on the Advanced Toroidal Facility (ATF). These measurements are presented and compared with the results of modeling codes that predict the analyzer signals during these heating processes. 6 refs., 5 figs

  16. Maintenance procedure upgrade programs

    International Nuclear Information System (INIS)

    Campbell, J.J.; Zimmerman, C.M.

    1988-01-01

    This paper describes a systematic approach to upgrading nuclear power plant maintenance procedures. The approach consists of four phases: diagnosis, program planning, program implementation, and program evaluation. Each phase is explained as a series of steps to ensure that all factors in a procedure upgrade program are considered

  17. Facility with a nuclear district heating reactor

    International Nuclear Information System (INIS)

    Straub, H.

    1988-01-01

    The district heating reactor has a pressure vessel which contains the reactor core and at least one coolant conducting primary heat carrier surrounded by a heat sink. The pressure vessel has two walls with a space between them. This space is connected with a container which contains air as heat isolating medium and water as heat conducting medium. During the normal reactor operation the space is filled by air from the container with the aid of a blower, whereas in the case of a break-down of the cooling system it is filled by water which flows out of the container by gravity after the blower has been switched off. The after-heat, generated in the reactor core during cooling break-down, is removed into the heat sink surrounding the pressure vessel in a safe and simple way. 6 figs

  18. Tropic of Langdale. [River water as a heat source for leisure centre

    Energy Technology Data Exchange (ETDEWEB)

    Cooper, K.

    1986-03-01

    A brief report is given of a unique example of energy management in a Lake District leisure centre. At the site of a former gunpowder mill, river water was directed over a mill race in which a heat exchanger was installed. Heat taken from the river is upgraded by heat pumps, thus providing the base heating and hot water for the leisure centre.

  19. Performance of Drift-Tube Detectors at High Counting Rates for High-Luminosity LHC Upgrades

    CERN Document Server

    Bittner, Bernhard; Kortner, Oliver; Kroha, Hubert; Manfredini, Alessandro; Nowak, Sebastian; Ott, Sebastian; Richter, Robert; Schwegler, Philipp; Zanzi, Daniele; Biebel, Otmar; Hertenberger, Ralf; Ruschke, Alexander; Zibell, Andre

    2016-01-01

    The performance of pressurized drift-tube detectors at very high background rates has been studied at the Gamma Irradiation Facility (GIF) at CERN and in an intense 20 MeV proton beam at the Munich Van-der-Graaf tandem accelerator for applications in large-area precision muon tracking at high-luminosity upgrades of the Large Hadron Collider (LHC). The ATLAS muon drifttube (MDT) chambers with 30 mm tube diameter have been designed to cope with and neutron background hit rates of up to 500 Hz/square cm. Background rates of up to 14 kHz/square cm are expected at LHC upgrades. The test results with standard MDT readout electronics show that the reduction of the drift-tube diameter to 15 mm, while leaving the operating parameters unchanged, vastly increases the rate capability well beyond the requirements. The development of new small-diameter muon drift-tube (sMDT) chambers for LHC upgrades is completed. Further improvements of tracking e?ciency and spatial resolution at high counting rates will be achieved with ...

  20. Regional waste treatment facilities with underground monolith disposal for all low-heat-generating nuclear wastes

    International Nuclear Information System (INIS)

    Forsberg, C.W.

    1982-01-01

    An alternative system for treatment and disposal of all ''low-heat-generating'' nuclear wastes from all sources is proposed. The system, Regional Waste Treatment Facilities with Underground Monolith Disposal (RWTF/UMD), integrates waste treatment and disposal operations into single facilities at regional sites. Untreated and/or pretreated wastes are transported from generation sites such as reactors, hospitals, and industries to regional facilities in bulk containers. Liquid wastes are also transported in bulk after being gelled for transport. The untreated and pretreated wastes are processed by incineration, crushing, and other processes at the RWTF. The processed wastes are mixed with cement. The wet concrete mixture is poured into large low-cost, manmade caverns or deep trenches. Monolith dimensions are from 15 to 25 m wide, and 20 to 60 m high and as long as required. This alternative waste system may provide higher safety margins in waste disposal at lower costs